SHOCK ABSORBING
MATERIAL
3.9" [10.00 cm]
MAX.
45` MIN.
CONCRETE
BRICK OR
EQUIVALENT
SHOCK ABSORBING PROPERTIES OF SURFACING
MATERIALS VARY. IF YOU DETERMINE THAT LESS
THAN 1'-0" [30.48cm] OF SURFACING IS REQUIRED,
MAKE UP THE DIFFERENCE IN ELEVATION WITH
EARTH, BEFORE APPLYING SURFACING.
"A"
"B"
UNIT GROUND PLAN)
1 1/16" [2.70 cm]
1 5/16" [3.33 cm]
1 5/8" [4.13 cm]
1 7/8" [4.83 cm]
2 3/8" [6.03 cm]
3 1/2" [8.89 cm]
5" [12.70 cm]
5" [12.70 cm]
TRACK RIDE & SWINGS
(PIPE SIZE)
DIA. "A"
1'-2" [35.56 cm]
1'-6" [45.72 cm]
1'-6" [45.72cm]
2'-0" [60.96 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
(FOOTING SIZE)
DIA. "B"
-SUGGESTED MINIMUM CONCRETE
OF EUROPEAN STANDARD EN1176-1 ONLY
-SLOPED FOOTING IS A REQUIREMENT
RATING: 3000 PSI
NOTES:
BRICK OR
DIMENSIONED
TO TOP OF 5" [12.70 cm]
TREE SCAPE
4'-0" [121.92 cm]
EARTH
EQUIVALENT
3/8" x 1 3/4"
P.B.H.C.S. w/PATCH
(812054)
3/8" LOCKWASHER
(817334)
3/8" FLAT WASHER
(817410)
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
NATURE DISCOVERY
TABLE SEAT (179945)
SEAT FRAME
3/8" LOCKWASHER
(817334)
3/8" FLAT WASHER
(817410)
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 802 of 1214 Page 832 of 1692 7239,(:
$66(0%/<9,(:
6+2:1
27+(56,0,/$5
R
+557'&4'8+5'&
ÄÄÄ
6912+'%'
*':&'%-
.#4)'*1.'5
#&#*1.'5
$&RPSDQ\
R
>FP@
>FP@
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
8372
'(&.+(,*+76
$//
'(&.+(,*+76
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 803 of 1214 Page 833 of 1692 (/(9$7,219,(:
3/$19,(:
3$*(
&21&5(7(5(48,5('
&XELF<DUGV
>&XELF0HWHUV@
>FP@
7<3
>
FP@7<3
>
FP@
>
FP@
7<3
>FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
7<3
>
FP@
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>FP@
>FP@ 5(6,/,(17685)$&(
),1,6+('685)$&(
%5,&.25(48,/9$/(17
6833/,('%<27+(56
Cudahy Park Renovation Project, Project # PRE-001 Document Control 804 of 1214 Page 834 of 1692 3$*(
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
75$&.5,'( 6:,1*6
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232) >FP@
75((6&$3(
>
FP@
($57+
(48,9$/(17
)227,1*'(7$,/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 805 of 1214 Page 835 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[
3%+&6
/2&.:$6+(5
)/$7:$6+(5
2'
127(
%2/766+28/'%(
72548(')520
)7/%6)25
3523(5,167$//$7,21
25 25
Cudahy Park Renovation Project, Project # PRE-001 Document Control 806 of 1214 Page 836 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
7187
)/$7:$6+(5
2'
/2&.:$6+(5
[3%+&6
Z3$7&+
25 25
25 Cudahy Park Renovation Project, Project # PRE-001 Document Control 807 of 1214 Page 837 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
7:23,(&(&2$7('+(;'(&.
7:23,(&(&2$7('$'$+(;'(&.
[3%+&6Z3$7&+
[3%+&6
)/$7:$6+(5
2'
/2&.:$6+(5
7187
HARDWARE COMPLETE
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW * Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
Cudahy Park Renovation Project, Project # PRE-001 Document Control 808 of 1214 Page 838 of 1692 R
+557'&4'8+5'&
ÄÄÄ
64#05('45;56'/
9+6*$#44+'4
Ä4+5'
Ä4+5'
Ä4+5'
Ä4+5'
A Company
Ä4+5'
R
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
$66(0%/<9,(:
6+2:1
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
81'(5
$//'(&.+(,*+76
$
Cudahy Park Renovation Project, Project # PRE-001 Document Control 809 of 1214 Page 839 of 1692 3$*(
>FP@
>FP@
3/$19,(:
>
FP@
>FP@
7239,(:
>FP@
>FP@
3/$19,(:
>FP@
>FP@
7239,(:
3/$19,(:
7239,(:
>FP@
>FP@
>FP@
>FP@
(;,67,1*
835,*+76
(;,67,1*
835,*+76
(;,67,1*
835,*+76
Cudahy Park Renovation Project, Project # PRE-001 Document Control 810 of 1214 Page 840 of 1692 3$*(
>
FP@
>FP@
>FP@
>
FP@
3/$19,(:
7239,(:
>
FP@
>FP@
3/$19,(:
7239,(:
(;,67,1*
835,*+76
(;,67,1*
835,*+76
>
FP@
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 811 of 1214 Page 841 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
)/$7:$6+(5
2'
[3%+&6
Z3$7&+
/2&.187
)/$7:$6+(5
2'
Cudahy Park Renovation Project, Project # PRE-001 Document Control 812 of 1214 Page 842 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
$/803,1
/2&.:$6+(5
[3%+&6
Z3$7&+
$
$
)/$7:$6+(5
2'
/2&.:$6+(5
[3%+&6
Z3$7&+
25 25
7187
127(
%2/76+28/'%(
72548(')520
)7/%6)25
3523(5,167$//7,21
Cudahy Park Renovation Project, Project # PRE-001 Document Control 813 of 1214 Page 843 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
758/2& $
&2$7('67(3/,1.
67(3$66(0%/<
67(3$66(0%/<
67(3$66(0%/<
67(3$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
/2&.187
7187
$/803,1
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW Cudahy Park Renovation Project, Project # PRE-001 Document Control 814 of 1214 Page 844 of 1692 R
+557'&4'8+5'&
ÄÄÄ
5%*110'4
%.+/$'4
Ä
Ä Ä
Ä Ä
Ä Ä
A Company
Ä Ä
Ä Ä
R
Ä Ä The CPSC recommends age separation on playgrounds. Supervise children to ensure
separation between 2 to 5 preschoolers and 5 to
12 year old school aged children.
This play equipment is
designed for children age
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
90103
90104
90105
90106
90107
90108
90109
ASSEMBLY VIEW
5'-0" 90106 SHOWN
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the assembly
details for the specific hardware required in
each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
200462
REFER TO MODULAR EQUIPMENT
TOP VIEW FOR CORRECT
ARCHWAY NUMBER
Cudahy Park Renovation Project, Project # PRE-001 Document Control 815 of 1214 Page 845 of 1692 PAGE 2
2'-0" [60.96 cm] 2'-6" [76.20 cm]
3'-0" [91.44 cm] 3'-6" [106.68 cm]
DECK HEIGHT
ELEVATION
2'-0" DECK HEIGHT
90103
2'-6" DECK HEIGHT
90104
3'-0" DECK HEIGHT
90104
3'-6" DECK HEIGHT
90105
200473
200469
200469 200307
Cudahy Park Renovation Project, Project # PRE-001 Document Control 816 of 1214 Page 846 of 1692 PAGE 3
4'-0" DECK HEIGHT
90105
4'-0" [121.92 cm] 4'-6" [137.16 cm]
4'-6" DECK HEIGHT
90106
5'-0" [152.40 cm]
5'-0" DECK HEIGHT
90106
5'-6" [167.64 cm]
5'-6" DECK HEIGHT
90107
DECK HEIGHT
ELEVATIONS
200307 200462
200462 200466
Cudahy Park Renovation Project, Project # PRE-001 Document Control 817 of 1214 Page 847 of 1692 PAGE 4
6'-0" [182.88 cm]
6'-0" DECK HEIGHT
90107
6'-6" [198.12 cm]
6'-6" DECK HEIGHT
90108
7'-0" DECK HEIGHT
90108
7'-0" [213.36 cm]
7'-6" DECK HEIGHT
90109
7'-6" [228.60 cm]
DECK HEIGHT
ELEVATIONS
200482
200479
200466
200479
Cudahy Park Renovation Project, Project # PRE-001 Document Control 818 of 1214 Page 848 of 1692 PAGE 5
8'-0" [243.84 cm]
8'-0" DECK HEIGHT
90109
DECK HEIGHT
ELEVATIONS
200482
Cudahy Park Renovation Project, Project # PRE-001 Document Control 819 of 1214 Page 849 of 1692 PAGE 6
0'-5" [12.78 cm]
TYP
1'-5 1/2" [44.45 cm]
2'-7 1/2" [80.01 cm]
4'-1" [124.46 cm]
1'-2" [35.56 cm]
1'-6 3/16" [46.25 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQUIRED)
CONCRETE REQUIRED:
.12 CUBIC YARDS
[.09 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON ALL
GROUND PLANS ARE MEASURED FROM
THE FINISHED SURFACE. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
4'-6 1/8" [137.55 cm]
0'-8 1/4" [20.99 cm]
TOP VIEW
ELEVATION VIEW
90106 5'-0" SHOWN
OTHERS SIMILAR
RESILIENT SURFACE
FINISHED SURFACE
BRICK OR EQUIVALENT
SUPPLIED BY OTHERS
PLAN VIEW
EXISTING
UPRIGHTS
158359
1'-6" [45.72 cm]
2'-6" [76.20 cm]
200462
Cudahy Park Renovation Project, Project # PRE-001 Document Control 820 of 1214 Page 850 of 1692 PAGE 7
1'-0" [30.48 cm]
VARIES
(REFER TO OVERALL
SHOCK ABSORBING
MATERIAL
3.9" [10.00 cm]
MAX.
45` MIN.
CONCRETE
BRICK OR
EQUIVALENT
SHOCK ABSORBING PROPERTIES OF SURFACING
MATERIALS VARY. IF YOU DETERMINE THAT LESS
THAN 1'-0" [30.48cm] OF SURFACING IS REQUIRED,
MAKE UP THE DIFFERENCE IN ELEVATION WITH
EARTH, BEFORE APPLYING SURFACING.
"A"
"B"
UNIT GROUND PLAN)
1 1/16" [2.70 cm]
1 5/16" [3.33 cm]
1 5/8" [4.13 cm]
1 7/8" [4.83 cm]
2 3/8" [6.03 cm]
3 1/2" [8.89 cm]
5" [12.70 cm]
5" [12.70 cm]
TRACK RIDE & SWINGS
(PIPE SIZE)
DIA. "A"
1'-2" [35.56 cm]
1'-6" [45.72 cm]
1'-6" [45.72cm]
2'-0" [60.96 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
(FOOTING SIZE)
DIA. "B"
-SUGGESTED MINIMUM CONCRETE
OF EUROPEAN STANDARD EN1176-1 ONLY
-SLOPED FOOTING IS A REQUIREMENT
RATING: 3000 PSI
NOTES:
BRICK OR
DIMENSIONED
TO TOP OF 5" [12.70 cm]
TREE SCAPE
4'-0" [121.92 cm]
EARTH
EQUIVALENT
FOOTING DETAIL
Cudahy Park Renovation Project, Project # PRE-001 Document Control 821 of 1214 Page 851 of 1692 STEP 2
2 PLACES
STEP 1
2 PLACES
PAGE 8
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
200307
158359
3/8" x 2" HEX HEAD
BOLT (801007)
3/8" LOCK WASHER
(817334)
3/8" HEX NUT
(804053)
200307
3/8" T-NUT (804556)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" LOCK WASHER
(817334)
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
200307
ENTRYWAY MUST BE INSTALLED PRIOR
TO ATTACHMENT OF THIS PRODUCT
Cudahy Park Renovation Project, Project # PRE-001 Document Control 822 of 1214 Page 852 of 1692 PAGE 9
Parts List
DESCRIPTION 90103 90104 90105 90106 90107 90108 90109 PART NUMBER SCHOONER CLIMBER WELD ASS'Y 0000001 200473
SCHOONER CLIMBER WELD ASS'Y 0000010 200469
SCHOONER CLIMBER WELD ASS'Y 0000100 200307
SCHOONER CLIMBER WELD ASS'Y 0001000 200462
SCHOONER CLIMBER WELD ASS'Y 0010000 200466
SCHOONER CLIMBER WELD ASS'Y 0100000 200479
SCHOONER CLIMBER WELD ASS'Y 1000000 200482
0000001 203664
1111110 203665
EXTENSION 2222220 158359*
3/8" x 3/4" P.B.H.C.S. w/PATCH 2222222 812052*
3/8" x 2" HEX HEAD BOLT 2222220 801007*
3/8" LOCK WASHER 4444442 817334*
3/8" FLAT WASHER (1 1/4" O.D.) 2222222 817424*
3/8" HEX-NUT 2222220 804053*
3/8" T-NUT 2222222 804556*
HARDWARE COMPLETE
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 823 of 1214 Page 853 of 1692 $66(0%/<9,(:
R
+557'&4'8+5'&
ÄÄÄ
$&RPSDQ\ %#.#$#<1 R
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
8372
'(&.+(,*+76
8372
'(&.+(,*+76
$
$
Cudahy Park Renovation Project, Project # PRE-001 Document Control 824 of 1214 Page 854 of 1692 (/(9$7,219,(:
3/$19,(:
7239,(:
3$*(
(;,67,1*835,*+7
>FP@
),1,6+('685)$&(
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
127(
&$/$%$=20867%(
&(17(5('%(7:((1835,*+76
%()25($77$&+,1*7202817,1*%$5
Cudahy Park Renovation Project, Project # PRE-001 Document Control 825 of 1214 Page 855 of 1692 67(3
67(3
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
127(
%2/76+28/'%(
72548(')520
)7/%6)25
3523(5,167$//7,21
6/,'(02817,1*%$57+58
),567($52)&$/$%$=2
6/,'(6&5$3(5217202817,1*
%$56/,'(02817,1*%$5
7+58/$67($52)&$/$%$=2
$
$
[6(/)
'5,9(6&5(:
'(7$,/9,(:
127(
[+(;+($'
6(/)'5,//,1*6&5(:
5(029(58%%(5
:$6+(5%()25(,167$//,1*
$
[3%+&6
Z3$7&+
/2&.:$6+(5
$/803,1
326,7,21627+$7
&2817(5681.+2/(,6
217+(%27720),(/'
'5,//+2/(7+528*+
3/$67,&$1'3,3(
127(
&$/$%$=20867%(
&(17(5('%(7:((1835,*+76
%()25($77$&+,1*7202817,1*%$5
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 826 of 1214 Page 856 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21 47< 3$57180%(5
&$/$%$=2
02817,1*%$5
758/2& $
6&5$3(5
$/803,1
[6(/)'5,9(6&5(:
/2&.:$6+(5
[3%+&6Z3$7&+
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW * Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
+$5':$5(&203/(7(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 827 of 1214 Page 857 of 1692
ASSEMBLY VIEW
90252 SHOWN
R
+557'&4'8+5'&
ÄÄÄ
.'#0+0)9#..
%.+/$'4
Ä
Ä
Ä
Ä
A Company
Ä
Ä
R
90255
90256
90257
90258
90259
90260
5'-6"
6'-0"
6'-6"
7'-0"
7'-6"
8'-0"
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the assembly
details for the specific hardware required in
each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
The CPSC recommends age separation on
playgrounds. Supervise children to ensure
separation between 2 to 5 preschoolers and 5 to
12 year old school aged children.
This play equipment is
designed for children age
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
90249
90250
90251
90252
90253
90254
90255
90256
90257
90258
90259
90260
177864
177855
Cudahy Park Renovation Project, Project # PRE-001 Document Control 828 of 1214 Page 858 of 1692
ELEVATION VIEW
90249 SHOWN
PLAN VIEW
90249 SHOWN
TOP VIEW
90249 SHOWN
2 PAGE
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
3'-2 1/8" [96.89 cm]
1'-6 1/8" [46.02 cm]
1'- 5/8" [32.05 cm]
TYP
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
2'-0" [60.96 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
163007
162262
1'-4 3/8" [41.52 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 829 of 1214 Page 859 of 1692
ELEVATION VIEW
90250 SHOWN
PLAN VIEW
90250 SHOWN
TOP VIEW
90250 SHOWN
3 PAGE
1'-11" [58.42 cm]
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
1'-7 13/16" [50.39 cm]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
2'-6" [76.20 cm]
163008
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
4'-1" [124.46 cm]
1'-8 11/16" [52.53 cm]
3'-3 7/16" [100.15 cm]
1'-4 1/16" [40.86 cm]
TYP
162263
Cudahy Park Renovation Project, Project # PRE-001 Document Control 830 of 1214 Page 860 of 1692
ELEVATION VIEW
90251 SHOWN
PLAN VIEW
90251 SHOWN
TOP VIEW
90251 SHOWN
4 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
1'-11 5/16" [59.28 cm]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
3'-0" [91.44 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
1'-7 9/16" [49.67 cm]
TYP
1'-11 1/2" [59.64 cm]
3'-4 15/16" [104.06 cm]
163009
162246
Cudahy Park Renovation Project, Project # PRE-001 Document Control 831 of 1214 Page 861 of 1692
ELEVATION VIEW
90252 SHOWN
PLAN VIEW
90252 SHOWN
TOP VIEW
90252 SHOWN
5 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
4'-0" [121.92 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
2'-5 1/2" [74.93 cm]
3'-8 11/16" [113.52 cm]
2'-2 1/2" [67.27 cm]
TYP
2'-6 1/4" [76.76 cm]
177864
177855
Cudahy Park Renovation Project, Project # PRE-001 Document Control 832 of 1214 Page 862 of 1692
ELEVATION VIEW
90253 SHOWN
PLAN VIEW
90253 SHOWN
TOP VIEW
90253 SHOWN
6 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
4'-6" [137.16 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
2'-8 3/8" [82.25 cm]
2'-5 11/16" [75.33 cm]
TYP
3'-10 5/8" [118.47 cm]
2'-9 5/8" [85.43 cm]
177866
177857
Cudahy Park Renovation Project, Project # PRE-001 Document Control 833 of 1214 Page 863 of 1692
ELEVATION VIEW
90254 SHOWN
PLAN VIEW
90254 SHOWN
TOP VIEW
90254 SHOWN
7 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
5'-0" [152.40 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
2'-9 1/8" [84.13 cm]
TYP
2'-11 9/16" [90.38 cm]
4'- 15/16" [124.25 cm]
3'-1 1/4" [94.54 cm]
177868
177859
Cudahy Park Renovation Project, Project # PRE-001 Document Control 834 of 1214 Page 864 of 1692
ELEVATION VIEW
90255 SHOWN
PLAN VIEW
90255 SHOWN
TOP VIEW
90255 SHOWN
8 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
5'-6" [167.64 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
3'- 7/8" [93.66 cm]
TYP
3'-3 1/8" [99.31 cm]
4'-3 9/16" [130.90 cm]
3'-4 3/4" [103.43 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
177870
177861
Cudahy Park Renovation Project, Project # PRE-001 Document Control 835 of 1214 Page 865 of 1692
ELEVATION VIEW
90256 SHOWN
PLAN VIEW
90256 SHOWN
TOP VIEW
90256 SHOWN
9 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
6'-0" [182.88 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
4'-1" [124.46 cm]
1'-11" [58.42 cm]
3'-4 5/16" [102.46 cm]
TYP
3'-6 3/8" [107.65 cm]
4'-6 1/16" [137.33 cm]
177863
177872
3'-8 1/4" [112.32 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 836 of 1214 Page 866 of 1692
ELEVATION VIEW
90257 SHOWN
PLAN VIEW
90257 SHOWN
TOP VIEW
90257 SHOWN
10 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
6'-6" [198.12 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
3'-9 11/16" [116.08 cm]
3'-7 13/16" [111.28 cm]
TYP
4'-8 11/16" [144.03 cm]
3'-11 3/4" [121.21 cm]
223023
223027
Cudahy Park Renovation Project, Project # PRE-001 Document Control 837 of 1214 Page 867 of 1692
ELEVATION VIEW
90258 SHOWN
PLAN VIEW
90258 SHOWN
TOP VIEW
90258 SHOWN
11 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
7'-0" [213.36 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
4'-1 5/16" [125.32 cm]
TYP
4'-3" [129.60 cm]
5'-1 1/16" [155.14 cm]
223028
223032
4'-4 3/4" [133.98 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 838 of 1214 Page 868 of 1692
ELEVATION VIEW
90259 SHOWN
PLAN VIEW
90259 SHOWN
TOP VIEW
90259 SHOWN
12 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
7'-6" [228.60 cm]
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
4'-3" [129.60 cm]
4'-1 5/16" [125.32 cm]
TYP
5'-1 1/16" [155.14 cm]
4'-4 3/4" [133.98 cm]
223028
223032
Cudahy Park Renovation Project, Project # PRE-001 Document Control 839 of 1214 Page 869 of 1692
ELEVATION VIEW
90260 SHOWN
PLAN VIEW
90260 SHOWN
TOP VIEW
90260 SHOWN
13 PAGE
EXISTING
UPRIGHTS
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.12 CUBIC YARDS
[0.10 CUBIC METERS]
4'-6 1/8" [137.55 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(2 REQ'D)
FINISHED SURFACE
RESILIENT SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
8'-0" [243.84 cm]
223028
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
1'-1" [33.02 cm]
1'-11" [58.42 cm]
4'-1" [124.46 cm]
4'-3" [129.60 cm]
5'-1 1/16" [155.14 cm]
4'-1 5/16" [125.32 cm]
TYP
223032
4'-4 3/4" [133.96 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 840 of 1214 Page 870 of 1692 14 PAGE
1'-0" [30.48 cm]
VARIES
(REFER TO OVERALL
SHOCK ABSORBING
MATERIAL
3.9" [10.00 cm]
MAX.
45` MIN.
CONCRETE
BRICK OR
EQUIVALENT
SHOCK ABSORBING PROPERTIES OF SURFACING
MATERIALS VARY. IF YOU DETERMINE THAT LESS
THAN 1'-0" [30.48cm] OF SURFACING IS REQUIRED,
MAKE UP THE DIFFERENCE IN ELEVATION WITH
EARTH, BEFORE APPLYING SURFACING.
"A"
"B"
UNIT GROUND PLAN)
1 1/16" [2.70 cm]
1 5/16" [3.33 cm]
1 5/8" [4.13 cm]
1 7/8" [4.83 cm]
2 3/8" [6.03 cm]
3 1/2" [8.89 cm]
5" [12.70 cm]
(PIPE SIZE)
DIA. "A"
1'-2" [35.56 cm]
1'-6" [45.72 cm]
1'-6" [45.72cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
(FOOTING SIZE)
DIA. "B"
-SUGGESTED MINIMUM CONCRETE
OF EUROPEAN STANDARD EN1176-1 ONLY
-SLOPED FOOTING IS A REQUIREMENT
RATING: 3000 PSI
NOTES:
BRICK OR
DIMENSIONED
TO TOP OF
EARTH
EQUIVALENT
FOOTING DETAIL
Cudahy Park Renovation Project, Project # PRE-001 Document Control 841 of 1214 Page 871 of 1692 STEP 1
2 PLACES
90259 AND 90260 ONLY
15 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
3/8" x 2 1/2" HEX
HEAD BOLT (801009) 3/8" LOCK WASHER
(817334)
3/8" HEX NUT
(804053)
152110 EXTENSION 8" FOR 90259
137926 EXTENSION 14" FOR 90260
223032
Cudahy Park Renovation Project, Project # PRE-001 Document Control 842 of 1214 Page 872 of 1692 STEP 3
2 PLACES
16 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
STEP 2: INSERT TAB OF
ENTRY BARRIER
WELD ASSEMBLY
INTO SLOT OF DECK
3/8" T-NUT (804556)
3/8" x 1" P.B.H.C.S.
w/PATCH (812050)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.)
(817424)
162262
162263
162246
177855
177857
177859
177861
177863
223027
223032
OR
OR
OR
OR
OR
OR
OR
OR
OR
Cudahy Park Renovation Project, Project # PRE-001 Document Control 843 of 1214 Page 873 of 1692 STEP 2
6 PLACES - (90249)
6 PLACES - (90250)
8 PLACES - (90251)
10 PLACES - (90252)
10 PLACES - (90253)
12 PLACES - (90254)
12 PLACES - (90255)
14 PLACES - (90256)
14 PLACES - (90257)
16 PLACES - (90258)
16 PLACES - (90259)
16 PLACES - (90260)
17 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
OR
OR
OR
OR
OR
OR
OR
OR
OR
163007
163008
163009
177864
177866
177868
177870
177872
223023
223028
NUT 5/16"- INSERT
TYPE 1 (HWN0149)
5/16" FLAT WASHER
(11/16" O.D.)
(817406)
5/16" LOCK WASHER
(817330)
5/16" x 2 1/2"
P.B.H.C.S. w/PATCH
(812048)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 844 of 1214 Page 874 of 1692 Parts List
PART
NUMBER DESCRIPTION 90249 90250 90251 90252 90253 90254
LEANING WALL PANEL 000001 163007
LEANING WALL PANEL 000010 163008
LEANING WALL PANEL 000100 163009
LEANING WALL PANEL 001000 177864
LEANING WALL PANEL 010000 177866
LEANING WALL PANEL 100000 177868
FRAME ASSEMBLY for LEANING WALL 000001 162262
FRAME ASSEMBLY for LEANING WALL 000010 162263
FRAME ASSEMBLY for LEANING WALL 000100 162246
FRAME ASSEMBLY for LEANING WALL 001000 177855
FRAME ASSEMBLY for LEANING WALL 010000 177857
FRAME ASSEMBLY for LEANING WALL 100000 177859
000011 223098
000100 223099
011000 223100
100000 223101
3/8" LOCK WASHER 222222 817334*
3/8" FLAT WASHER (1 1/4" O.D.) 222222 817424*
3/8" x 1" P.B.H.C.S. w/PATCH 222222 812050*
NUT 5/16"- INSERT TYPE 1 121010866 HWN0149*
5/16" FLAT WASHER (11/16" O.D.) 121010866 817406*
5/16" x 2 1/2" P.B.H.C.S. w/PATCH 121010866 812048*
5/16" LOCK WASHER 121010866 817330*
3/8" T-NUT 222222 804556*
18 PAGE
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 845 of 1214 Page 875 of 1692 Parts List
PART
NUMBER DESCRIPTION 90255 90256 90257 90258 90259 90260
LEANING WALL PANEL 000001 177870
LEANING WALL PANEL 000010 177872
LEANING WALL PANEL 000100 223023
LEANING WALL PANEL 111000 223028
FRAME ASS'Y for LEANING WALL 000001 177861
FRAME ASS'Y for LEANING WALL 000010 177863
FRAME ASS'Y for LEANING WALL 000100 223027
FRAME ASS'Y for LEANING WALL 111000 223032
000001 223101
000110 223102
001000 223103
010000 223104
100000 223105
3/8" LOCK WASHER 442222 817334*
3/8" FLAT WASHER (1 1/4" O.D.) 222222 817424*
3/8" x 1" P.B.H.C.S. w/PATCH 222222 812050*
NUT 5/16"- INSERT TYPE 1 161616141412 HWN0149*
5/16" FLAT WASHER (11/16" O.D.) 161616141412 817406*
5/16" x 2 1/2" P.B.H.C.S. w/PATCH 161616141412 812048*
5/16" LOCK WASHER 161616141412 817330*
3/8" T-NUT 222222 804556*
3/8" x 2 1/2" HEX HEAD BOLT 220000 801009*
3/8" HEX NUT 220000 804053*
EXTENSION 8" 020000 152110*
EXTENSION 14" 200000 137926*
19 PAGE
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 846 of 1214 Page 876 of 1692 R
+557'&4'8+5'&
ÄÄÄ
INSTALLATION
PARTS LIST
DETAIL
REFERENCE
=
=
#4%*9#;
Y51%-'6
)7#4&4#+.
$#44+'4
A Company
R
The CPSC recommends age separation on
playgrounds. Supervise children to ensure
separation between 2 to 5 preschoolers and 5 to
12 year old school aged children.
This play equipment is
designed for children age
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 90305 90306
ASSEMBLY DRAWINGS
INSTALLATION
INSTRUCTIONS
1. Before assembling this
equipment, read the enclosed
INSTALLER INSTRUCTIONS in
the installation booklet; follow all
the instructions during installation.
2. Assemble parts as shown in
the ASSEMBLY DRAWING.
Refer to the assembly details
for the specific hardware
required in each connection.
90306
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
90305
2'-6"
OR
BELOW
90305
4'-0"
OR
BELOW
90305 90306
TOP VIEWS
0'-7 1/2" [19.01 cm] 0'-7 1/2" [19.01 cm]
4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm]
1 747
087
Cudahy Park Renovation Project, Project # PRE-001 Document Control 847 of 1214 Page 877 of 1692 PAGE 2
Parts List
REF. DESCRIPTION 90305 90306 PART NUMBER
1 ARCHWAY 01 206338
1 ARCHWAY W/INFILL WELD ASS'Y 10 206336
TRU-LOC 22 Z03650
11 206595
3/8" x 3/4" P.B.H.C.S. w/PATCH 22 812052*
3/8" x 2" P.B.H.C.S. w/PATCH 22 812055*
3/8" LOCKWASHER 44 817334*
3/8" FLAT WASHER (1 1/4" O.D.) 22 817424*
3/8" T-NUT 22 804556*
ALUM. PIN 22 203568*
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 848 of 1214 Page 878 of 1692 PAGE 3
IMPORTANT
TO REDUCE THE RISK OF CLOTHING ENTANGLEMENT IN COMPLIANCE WITH ASTM F1487, ANY BOLT END
PROTRUDING MORE THAN TWO FULL THREADS BEYOND THE FACE OF THE NUT SHALL BE CUT-OFF FLUSH, FILED SMOOTH AND TREATED TO PREVENT CORROSION.
NOTE: LOCTITE (SUPPLIED BY OTHERS) SHOULD BE USED ON ALL THREADED HARDWARE.
NOTE: AFTER ASSEMBLY IS COMPLETE, PEEN TEE-NUTS AND FLATWASHERS TO MATCH RADIUS OF PIPE. 13 2 3 4 56
&'6#+.5ÄHQTÄ
0 INCH 1
0 CM 123 4 57 6 8 9 10 12 11 14 15
3/8" T-NUT (804556)
ENCLOSURE
DECK
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" LOCKWASHER
(817334)
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
( * = A OR Z )
*NOTE:
BOLT SHOULD BE
TORQUED FROM
20-25 FT. LBS. FOR
PROPER INSTALLTION.
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
RUNG
UPRIGHT
TRU-LOC
(*03650)
3/8" LOCKWASHER
(817334)
ALUM. PIN (203568)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 849 of 1214 Page 879 of 1692 R
+557'&4'8+5'&
ÄÄÄ
%.18'4.'#(
%.+/$'4
Ä Ä
Ä Ä
Ä Ä
Ä Ä
A Company
R
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
$66(0%/<9,(:
6+2:1
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
5()(57202'8/$5(48,30(177239,(:
)25&255(&7(157<:$<180%(5
(157<:$<0867%(,167$//('35,25
72$77$&+0(172)7+,6352'8&7
Cudahy Park Renovation Project, Project # PRE-001 Document Control 850 of 1214 Page 880 of 1692 3$*(
>
FP@
>FP@
>
FP@
>FP@
'(&.+(,*+7
(/(9$7,216
9,(:
9,(:
9,(:
9,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 851 of 1214 Page 881 of 1692 3$*(
>FP@
>
FP@
>FP@
>FP@
'(&.+(,*+7
(/(9$7,216
9,(:
9,(:
9,(:
9,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 852 of 1214 Page 882 of 1692 7239,(:
3/$19,(:
(/(9$7,219,(:
6+2:1
27+(566,0,/$5 3$*(
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@ (;,67,1*835,*+7
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
>FP@
>FP@
>
FP@
5(6,/,(17685)$&(
),1,6+('685)$&(
%5,&.25(48,9$/(17
6833/,('%<27+(56
12(;7(16,21/(*
Cudahy Park Renovation Project, Project # PRE-001 Document Control 853 of 1214 Page 883 of 1692 7239,(:
3/$19,(:
(/(9$7,219,(:
6+2:1
27+(566,0,/$5 3$*(
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@ (;,67,1*835,*+7
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
5(6,/,(17685)$&(
),1,6+('685)$&(
>FP@
>FP@
>FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
127(
86((;7(16,21/(*
(;7(16,21/(*
Cudahy Park Renovation Project, Project # PRE-001 Document Control 854 of 1214 Page 884 of 1692 3$*(
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232)
($57+
(48,9$/(17
)227,1*'(7$,/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 855 of 1214 Page 885 of 1692 67(3
67(3
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
+(;187
/2&.:$6+(5
(;7(16,21/(*
[+(;
+($'%2/7
)/$7:$6+(5
[
3%+&6Z3$7&+
%$55(/187
(;,67,1*(157<:$<
'(7$,/9,(:
6+2:1
27+(566,0,/$5
5(48,5('21
Cudahy Park Renovation Project, Project # PRE-001 Document Control 856 of 1214 Page 886 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
&/29(5/($)&/,0%(5$66
<
&/29(5/($)&/,0%(5$66
<
&/29(5/($)&/,0%(5$66
<
&/29(5/($)&/,0%(5$66
<
(;7(16,21/(*
[3%+&6Z3$7&+
[+(;+($'%2/7
)/$7:$6+(5
/2&.:$6+(5
%$55(/187
+(;187
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW Cudahy Park Renovation Project, Project # PRE-001 Document Control 857 of 1214 Page 887 of 1692 R
+557'&4'8+5'&
ÄÄÄ
,167$//$7,21
3$576/,67
'(7$,/
5()(5(1&(
%1706'4
2#0'.
A Company
R
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
72
'(&.+(,*+76
72
'(&.+(,*+76
INSTALLATION
INSTRUCTIONS
%HIRUHDVVHPEOLQJWKLVHTXLSPHQW
UHDGWKHHQFORVHG,167$//(5
,16758&7,216LQWKHLQVWDOODWLRQ
ERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKH
DVVHPEO\GHWDLOVIRUWKHVSHFLILF
KDUGZDUHUHTXLUHGLQHDFKFRQQHFWLRQ
>FP@
>FP@
ASSEMBLY DRAWING
TOP VIEW
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 858 of 1214 Page 888 of 1692 3$*(
3DUWV/LVW
5() '(6&5,37,21
3$57180%(5
(1&/2685(
6($7
758/2&3$1(/$77$&+0(17 *
/%5$&.(7
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[+(;+($'%2/7
/2&.:$6+(5
+(;187
7187
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 859 of 1214 Page 889 of 1692 3$*(
I03257$17
725('8&(7+(5,6.2)&/27+,1*(17$1*/(0(17,1&203/,$1&(:,7+$670)$1<%2/7(1' 352758',1*025(7+$17:2)8//7+5($'6%(<21'7+()$&(2)7+(1876+$//%(&872)))/86+),/(' 60227+$1'75($7('7235(9(17&25526,21
127(
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('+$5':$5(
127(
$)7(5$66(0%/<,6&203/(7(3((17((1876$1')/$7:$6+(56720$7&+5$',862)3,3(
&'6#+.5ÄHQTÄ
,1&+
&0
3$1(/
835,*+7
7:*RU.
127(
+(;%2/76+28/'
%(72548(')520
)7/%6)253523(5
,167$//$7,21
758/2&
3$1(/$77$&+0(17
[+(;
+($'%2/7
/2&.:$6+(5
[3%+&6
Z3$7&+
/2&.:$6+(5
7187
6($7
6725(
(1&/2685(
/%5$&.(7
[
3%+&6Z3$7&+
[
3%+&6Z3$7&+
+(;187
/2&.:$6+(5
Cudahy Park Renovation Project, Project # PRE-001 Document Control 860 of 1214 Page 890 of 1692 R
+557'&4'8+5'&
ÄÄÄ
INSTALLATION
PARTS LIST
DETAIL
REFERENCE
=
=
5.12'&
(700'.
%.+/$'4
$#44+'4
)7#4&4#+.
A Company
R
ASSEMBLY VIEW
TOP VIEW
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLATION INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the ASSEMBLY
DRAWING. Refer to the assembly details for the
specific hardware required in each connection.
%*+.&4'0
6JKURNC[GSWKROGPV KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
747
117
619
90366
1'-6" THRU 5'-0"
90403
1'-6" THRU 2'-6"
90366
1'-6" THRU 9'-0"
90403
1'-6" THRU 4'-0"
4'-6 1/8" [137.61 cm]
4'-6 1/8" [137.55 cm]
2 1
3 4
Cudahy Park Renovation Project, Project # PRE-001 Document Control 861 of 1214 Page 891 of 1692 Parts List
REF. DESCRIPTION 90366 90403 PART NUMBER
1 RIGHT BARRIER WELD ASS'Y 01 204573
1 RIGHT GUARDRAIL WELD ASS'Y 10 204584
2 LEFT BARRIER WELD ASS'Y 01 204581
2 LEFT GUARDRAIL WELD ASS'Y 10 204586
3 COATED PUNCHED WALKWAY 11 179568
4 HDPE STEP 44 200687
TRU-LOC 44 A03650
11 204588
3/8" x 3/4" P.B.H.C.S. w/PATCH 24 24 812052*
3/8" x 2" P.B.H.C.S. w/PATCH 44 812055*
3/8" FLAT WASHER 12 12 817410*
3/8" FLAT WASHER (1 1/4" O.D.) 12 12 817424*
3/8" LOCK WASHER 16 16 817334*
3/8" TEE NUT 24 24 804556*
ALUM. PIN 44 203568*
2 PAGE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete. 4'-1" [124.46 cm]
EXISTING URIGHT
GROUND PLAN
4'-1" [124.46 cm] 5'-9 5/16" [176.01 cm]
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 862 of 1214 Page 892 of 1692 3 PAGE
IMPORTANT
TO REDUCE THE RISK OF CLOTHING ENTANGLEMENT IN COMPLIANCE WITH ASTM F1487, ANY BOLT END
PROTRUDING MORE THAN TWO FULL THREADS BEYOND THE FACE OF THE NUT SHALL BE CUT-OFF FLUSH, FILED SMOOTH AND TREATED TO PREVENT CORROSION.
NOTE: LOCTITE (SUPPLIED BY OTHERS) SHOULD BE USED ON ALL THREADED HARDWARE.
NOTE: AFTER ASSEMBLY IS COMPLETE, PEEN TEE-NUTS AND FLATWASHERS TO MATCH RADIUS OF PIPE. 13 2 3 4 5 6
&'6#+.5ÄHQTÄ
0 INCH 1
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
DECK DECK
HANDRAIL
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" T-NUT (804556)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" LOCK WASHER
(817334)
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
3/8" T-NUT (804556)
COATED
PLATFORM
HDPE STEP
3/8" TEE NUT
(804556)
3/8" FLAT WASHER
3/8" x 3/4" P.B.H.C.S. (817410)
w/PATCH (812052)
( * = A OR Z )
*NOTE:
BOLT SHOULD BE
TORQUED FROM
20-25 FT. LBS. FOR
PROPER INSTALLTION.
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
RUNG
UPRIGHT
TRU-LOC
(*03650)
3/8" LOCK WASHER
(817334)
ALUM. PIN (203568)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 863 of 1214 Page 893 of 1692 R
+557'&4'8+5'&
ÄÄÄ
4+8'4
41%-
%.+/$'4
A Company
R
7KH &36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
$66(0%/<'5$:,1*
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
'(&.+(,*+76
'(&.+(,*+76
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
5()(5(1&('(&.+(,*+7)25
&/,0%(525,(17$7,21
6((&+$57$1''(7$,/
'(&.+(,*+7&+$57
'(&.+(,*+7 &/,0%(525,(17$7,21
%27720%
%27720%
%27720%
%27720$
%27720$
%27720$
Cudahy Park Renovation Project, Project # PRE-001 Document Control 864 of 1214 Page 894 of 1692 3$*(
>FP@
>FP@
'(&.
>FP@
>FP@
'(&.
>FP@
>FP@
'(&.
>
FP@
>FP@
'(&.
>FP@
>FP@
>
FP@
>
FP@
'(&.
'(&.
7239,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 865 of 1214 Page 895 of 1692 3$*(
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
(/(9$7,219,(:
6+2:1
27+(566,0,/$5
3/$19,(:
>FP@
',0
$
P
>FP@',$0(7(5[
>FP@'((3
5(48,5('
(;,67,1*
835,*+76
>FP@
>FP@
>FP@
>FP@
5(6,/,(17685)$&(
),1,6+('685)$&(
7DEOH
'(&.+(,*+76 ',0(16,21
$
',0(16,21
%
>
FP@
>FP@
>FP@
>FP@
>
FP@
>
FP@
>FP@
>
FP@
>FP@
>
FP@
>FP@
>
FP@
',0
%
Cudahy Park Renovation Project, Project # PRE-001 Document Control 866 of 1214 Page 896 of 1692 3$*(
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
75$&.5,'( 6:,1*6
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232) >FP@
75((6&$3(
>
FP@
($57+
(48,9$/(17
)227,1*'(7$,/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 867 of 1214 Page 897 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
127(
'(&.+(,*+76
&/,0%(525,(17$7,21
,1',&$725)$&(6*5281'
[
3%+&6Z3$7&+
/2&.:$6+(5
[3%+&6
Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
7187
&/,0%(5
25,(17$7,21
)/$7:$6+(5
Cudahy Park Renovation Project, Project # PRE-001 Document Control 868 of 1214 Page 898 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[3%+&6
Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
Cudahy Park Renovation Project, Project # PRE-001 Document Control 869 of 1214 Page 899 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21 47< 3$57180%(5
5,9(552&.&/,0%(5
60$6+(')227%8&.
02817,1*%5$&.(7
[3%+&6Z3$7&+
[3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
7187
)/$7:$6+(5
2'
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW Cudahy Park Renovation Project, Project # PRE-001 Document Control 870 of 1214 Page 900 of 1692 $66(0%/<9,(:
6+2:1
R
+557'&4'8+5'&
ÄÄÄ
(700'.
$4+&)'
$#44+'4
&'%-52#0
)7#4&4#+.
&'%-52#0
$#44+'4
&'%-52#0
)7#4&4#+.
&'%-52#0
A Company
R
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
$
7+58
7+58
7+58
7+58
Cudahy Park Renovation Project, Project # PRE-001 Document Control 871 of 1214 Page 901 of 1692 $66(0%/<9,(:
6+2:1
3$*(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 872 of 1214 Page 902 of 1692 $66(0%/<9,(:
6+2:1
3$*(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 873 of 1214 Page 903 of 1692 $66(0%/<9,(:
6+2:1
3$*(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 874 of 1214 Page 904 of 1692 3/$19,(:
7239,(:
3$*(
>FP@
7<3
>FP@
7<3
(;,67,1*
835,*+76
>FP@
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 875 of 1214 Page 905 of 1692 3/$19,(:
7239,(:
3$*(
>
FP@
7<3
>FP@
7<3
(;,67,1*
835,*+76
>FP@
>
FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 876 of 1214 Page 906 of 1692 67(3
3/$&(6
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
6+2:1
27+(566,0,/$5
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[3%+&6
Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
7187
$/803,1
/2&.:$6+(5
[3%+&6
Z3$7&+
$
(;,67,1*
835,*+7
$
(;,67,1*
'(&.
127(
%2/76+28/'%(
72548(')520)7/%6
)253523(5,167$//$7,21
25 Cudahy Park Renovation Project, Project # PRE-001 Document Control 877 of 1214 Page 907 of 1692 67(3
3/$&(6
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
6+2:1
27+(566,0,/$5
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
7187
)/$7:$6+(5
2'
/2&.:$6+(5
[3%+&6
Z3$7&+
(;,67,1*
'(&.
25
Cudahy Park Renovation Project, Project # PRE-001 Document Control 878 of 1214 Page 908 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
'(&.63$1%$55,(5:(/'$66(0%/<
'(&.63$1*8$5'5$,/:(/'$66(0%/<
'(&.63$1%$55,(5:(/'$66(0%/<
'(&.63$1*8$5'5$,/:(/'$66(0%/<
381&+('67((/:$/.:$<
758/2& $
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
7187
$/803,1
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW
HARDWARE COMPLETE
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 879 of 1214 Page 909 of 1692 R
+557'&4'8+5'&
ÄÄÄ
,167$//$7,21
3$576/,67
'(7$,/
5()(5(1&(
<+2
5.+&'
ÄÄ9#8'<+25.+&'
ÄÄ<+25.+&'
ÄÄ<+25.+&'
Ä9#8'<+25.+&'
A Company
R
INSTALLATION
INSTRUCTIONS
%HIRUHDVVHPEOLQJWKLVHTXLSPHQW
UHDGWKHHQFORVHG,167$//(5
,16758&7,216LQWKHLQVWDOODWLRQ
ERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKH
DVVHPEO\GHWDLOVIRUWKHVSHFLILF
KDUGZDUHUHTXLUHGLQHDFK
FRQQHFWLRQ
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
$//'(&.
+(,*+76
ASSEMBLY DRAWING
6+2:1
5()(572(/(9$7,21
9,(:6)256/,'($1'
,1*5281')//27%8&.
3,3(&20321(17180%(56
Cudahy Park Renovation Project, Project # PRE-001 Document Control 880 of 1214 Page 910 of 1692 3$*(
127(
+2/('(37+6,1',&$7('21
$//*5281'3/$16$5(0($685('
)5207+(),1,6+('685)$&(6((
)227,1*'(7$,/$//)227,1*',0(16,216
$5(%$6('21/(9(/),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
3/$19,(:
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17685)$&(
(;,7+(,*+7&+$57
67$1'$5' (;,7+(,*+7IURP685)$&,1*
$670 25/(66
&6$ PP25/(66
(1 PP25/(66
>FP@
>FP@
>FP@
>FP@
6(((;,7+(,*+7&+$57
726/23(21
(;,75(*,21
>FP@',$[
>FP@'((3
>
FP@
>FP@
25
>FP@
>FP@
(;,67,1*
835,*+76
%5,&.25(48,9$/(17
6833/,('%<27+(56
Cudahy Park Renovation Project, Project # PRE-001 Document Control 881 of 1214 Page 911 of 1692 3$*(
127(
+2/('(37+6,1',&$7('21
$//*5281'3/$16$5(0($685('
)5207+(),1,6+('685)$&(6((
)227,1*'(7$,/$//)227,1*',0(16,216
$5(%$6('21/(9(/),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
3/$19,(:
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17685)$&(
(;,7+(,*+7&+$57IRU
'(&.
67$1'$5' (;,7+(,*+7IURP685)$&,1*
$670 25/(66
&6$ PP25/(66
(1 PP25/(66
>FP@
>FP@',$[
>FP@'((3
>FP@
>
FP@
25
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
>FP@
6(((;,7+(,*+7&+$57
726/23(21
(;,75(*,21
>FP@
>FP@
>FP@
(;,7+(,*+7&+$57IRU
'(&.
67$1'$5' (;,7+(,*+7)520685)$&,1*
$670 72
&6$ PP72PP
(1 PP25/(66
(;,67,1*
835,*+76
Cudahy Park Renovation Project, Project # PRE-001 Document Control 882 of 1214 Page 912 of 1692 3$*(
127(
+2/('(37+6,1',&$7('21
$//*5281'3/$16$5(0($685('
)5207+(),1,6+('685)$&(6((
)227,1*'(7$,/$//)227,1*',0(16,216
$5(%$6('21/(9(/),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
3/$19,(:
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17685)$&(
>FP@',$[
>FP@'((3
>FP@
>FP@
25
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
>FP@
6(((;,7+(,*+7&+$57
726/23(21
(;,75(*,21
>FP@
>FP@
>FP@
>
FP@
(;,7+(,*+7&+$57
67$1'$5' (;,7+(,*+7)520685)$&,1*
$670 72
&6$ PP72PP
(1 PP25/(66
(;,67,1*
835,*+76
Cudahy Park Renovation Project, Project # PRE-001 Document Control 883 of 1214 Page 913 of 1692 3$*(
127(
+2/('(37+6,1',&$7('21
$//*5281'3/$16$5(0($685('
)5207+(),1,6+('685)$&(6((
)227,1*'(7$,/$//)227,1*',0(16,216
$5(%$6('21/(9(/),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
3/$19,(:
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17
685)$&(
>FP@',$[
>FP@'((3
>FP@
>FP@
>FP@
>
FP@
(;,7+(,*+7&+$57
67$1'$5' (;,7+(,*+7)520685)$&,1*
$670 72
&6$ PP72PP
(1 PP25/(66
>FP@
>FP@
6(((;,7+(,*+7&+$57
726/23(21
(;,75(*,21
>FP@
(;,67,1*
835,*+76
%5,&.25(48,9$/(17
6833/,('%<27+(56
Cudahy Park Renovation Project, Project # PRE-001 Document Control 884 of 1214 Page 914 of 1692 3$*(
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
75$&.5,'( 6:,1*6
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232) >FP@
75((6&$3(
>
FP@
($57+
(48,9$/(17
(116+0)&'6#+.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 885 of 1214 Page 915 of 1692 67(3
3/$&(6
67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[
3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
)/$7:$6+(5
2'
/2&.:$6+(5
[
3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
[
3%+&6Z3$7&+
Cudahy Park Renovation Project, Project # PRE-001 Document Control 886 of 1214 Page 916 of 1692 67(3
67(3
21/<5(48,5(')25
$1'
'(&.+(,*+76
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
$77$&+)227%8&.
3/$7(726/,'($7$//
02/'(',1,16(576
86,1*+$5':$5(
6+2:1
25 [3%+&6
Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
$/,*1',$0(7(5+2/(6
,1)227%8&.3/$7($1'
)227%8&.3,3($1'$77$&+
:,7++:686,1*
$1,03$&7'5,9(5
[6(/)
7$33,1*725;
Z3$7&+
+:6
[+(;
+($'%2/7
+(;187
/2&.:$6+(5
(;7(16,21/(*
Cudahy Park Renovation Project, Project # PRE-001 Document Control 887 of 1214 Page 917 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
6,1*/(=,36/,'(+22'
=,36/,'(
=,36/,'(
=,36/,'(
=,36/,'(
)227%8&.3/$7(
)227%8&.3,3(
)227%8&.3,3(
+$5':$5(&203/(7(
+$5':$5(&203/(7(
(;7(16,21/(*
[3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
)/$7:$6+(5
2'
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
2'
[3%+&6Z3$7&+
[+(;+($'%2/7
+(;187
[6(/)7$33,1*725;Z3$7&+ +:6
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW * Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
Cudahy Park Renovation Project, Project # PRE-001 Document Control 888 of 1214 Page 918 of 1692 R
+557'&4'8+5'&
ÄÄÄ
INSTALLATION
PARTS LIST
DETAIL
REFERENCE
=
=
6*70&'44+0)
*#.(2#0'.
A Company
R
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
UP TO 2'-6"
DECK HEIGHTS
UP TO 4'-0"
DECK HEIGHTS
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read
the enclosed INSTALLATION
INSTRUCTIONS in the installation booklet;
follow all the instructions during installation.
2. Assemble past as shown in the
ASSEMBLY DRAWING. Refer to the
assembly details for the specific hardware
required in each connection.
4'-6 1/8" [137.55 cm]
0'-7 11/16" [19.55 cm]
TOP VIEW
1 2
536 687
ASSEMBLY DRAWING
Cudahy Park Renovation Project, Project # PRE-001 Document Control 889 of 1214 Page 919 of 1692 PAGE 2
Parts List
REF. DESCRIPTION QTY PART NUMBER
1 THUNDERRING 1 179013
2 THUNDERRING HALF PANEL 1 179231
TRU-LOC PANEL ATTACHMENT 4 G03861
1 204466
3/8" x 1" P.B.H.C.S. w/PATCH 4 812050*
3/8" x 1 1/2" P.B.H.C.S. w/ PATCH 2 812053*
3/8" x 1 3/4" HEX HEAD BOLT 4 801006*
3/8" FLAT WASHER 4 817410*
3/8" LOCKWASHER 10 817334*
3/8" ACORN NUT 2 804002*
3/8" T-NUT 4 804556*
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 890 of 1214 Page 920 of 1692 PAGE 3
IMPORTANT
TO REDUCE THE RISK OF CLOTHING ENTANGLEMENT IN COMPLIANCE WITH ASTM F1487, ANY BOLT END
PROTRUDING MORE THAN TWO FULL THREADS BEYOND THE FACE OF THE NUT SHALL BE CUT-OFF FLUSH, FILED SMOOTH AND TREATED TO PREVENT CORROSION.
NOTE: LOCTITE (SUPPLIED BY OTHERS) SHOULD BE USED ON ALL THREADED HARDWARE.
NOTE: AFTER ASSEMBLY IS COMPLETE, PEEN TEE-NUTS AND FLATWASHERS TO MATCH RADIUS OF PIPE. 13 2 3 4 56
&'6#+.5ÄHQTÄ
0 INCH 1
0 CM 123 4 57 6 8 9 10 12 11 14 15
POLYETHYLENE
PANEL
THUNDERRING
3/8" ACORN NUT
(804002)
3/8" FLAT WASHER
(817410)
3/8" x 1 1/2"
P.B.H.C.S. w/ PATCH
(812053)
3/8" LOCKWASHER
(817334)
3/8" FLAT WASHER
(817410)
PANEL
UPRIGHT
(* = T, W, G or K)
*NOTE: HEX BOLT SHOULD
BE TORQUED FROM 20-25
FT. LBS. FOR PROPER
INSTALLATION.
TRU-LOC PANEL
ATTACHMENT
(*03861)
3/8" x 1 3/4" HEX
HEAD BOLT (801006)
3/8" LOCKWASHER
(817334)
3/8" x 1" P.B.H.C.S.
w/PATCH (812050)
3/8" LOCKWASHER
(817334)
3/8" T-NUT (804556)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 891 of 1214 Page 921 of 1692 $66(0%/<9,(:
R
+557'&4'8+5'&
ÄÄÄ
*174).#55
%.+/$'4 $&RPSDQ\ R
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 892 of 1214 Page 922 of 1692
9,(:
9,(:
9,(:
9,(:
3$*(
>FP@
>
FP@
>FP@
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 893 of 1214 Page 923 of 1692 (/(9$7,219,(:
6+2:1
3/$19,(:
6+2:1
7239,(:
6+2:1
3$*(
>FP@
>FP@
7<3
>FP@
7<3
>
FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
(;,67,1*835,*+7
),1,6+('685)$&(
5(6,/,(17685)$&(
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
>FP@
>FP@
>FP@
>FP@
>FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
>
FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 894 of 1214 Page 924 of 1692 (/(9$7,219,(:
6+2:1
3/$19,(:
6+2:1
7239,(:
6+2:1
3$*(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>FP@
>FP@
7<3
>FP@
7<3
>
FP@
(;,67,1*835,*+7
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
>FP@
>
FP@
),1,6+('685)$&(
5(6,/,(17685)$&(
>FP@
>FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 895 of 1214 Page 925 of 1692 (/(9$7,219,(:
6+2:1
3/$19,(:
6+2:1
7239,(:
6+2:1
3$*(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>
FP@
7<3
>FP@
>FP@
7<3
>
FP@
(;,67,1*835,*+7 P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
),1,6+('685)$&(
5(6,/,(17685)$&(
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 896 of 1214 Page 926 of 1692 (/(9$7,219,(:
6+2:1
3/$19,(:
6+2:1
7239,(:
6+2:1
3$*(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>FP@
>FP@
>FP@
7<3
>
FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
(;,67,1*835,*+7
>FP@
>FP@
5(6,/,(17685)$&(
),1,6+('685)$&(
>FP@
>FP@
>FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 897 of 1214 Page 927 of 1692 3$*(
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232)
($57+
(48,9$/(17
)227,1*'(7$,/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 898 of 1214 Page 928 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[
3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
7187
67(3
$77$&+7$%2)
&/,0%(5(175<:$<%$55,(5
,16,'(2)'(&.
'(7$,/9,(:
(;,67,1*'(&.
[
3%+&6Z3$7&+
/2&.:$6+(5
Cudahy Park Renovation Project, Project # PRE-001 Document Control 899 of 1214 Page 929 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
7187
/2&.:$6+(5
[3%+&6 127(
Z3$7&+
)227%8&.72%(
,167$//('21,16,'(
2)&/,0%(55$,/6
Cudahy Park Renovation Project, Project # PRE-001 Document Control 900 of 1214 Page 930 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21 47< 3$57180%(5
+285*/$66&/,0%(5
02817,1*%5$&.(7
)227%8&.
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
7187
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW * Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
+$5':$5(&203/(7(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 901 of 1214 Page 931 of 1692 $66(0%/<9,(:
6+2:1
R
+557'&4'8+5'&
ÄÄÄ
'4)1
%.+/$'4
Ä Ä
Ä Ä
Ä
$&RPSDQ\
R
5()(57202'8/$5(48,30(177239,(:
)25&255(&7(157<:$<180%(5
(157<:$<0867%(,167$//('35,25
72$77$&+0(172)7+,6352'8&7
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 902 of 1214 Page 932 of 1692
9,(:
9,(:
9,(:
9,(:
9,(:
3$*(
>FP@
>FP@
>FP@
>
FP@
>FP@
'(&.+(,*+7
(/(9$7,216
Cudahy Park Renovation Project, Project # PRE-001 Document Control 903 of 1214 Page 933 of 1692 3/$19,(:6
3$*(
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
>FP@
>FP@
$
%
),1$/180%(5 '(&.+(,*+7 ',0
$
',0
%
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>
FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 904 of 1214 Page 934 of 1692 (/(9$7,219,(:
6+2:1
27+(566,0,/$5
3$*(
),1,6+('685)$&(
5(6,/,(17685)$&(
>FP@
>FP@
>FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232)
($57+
(48,9$/(17
)227,1*'(7$,/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 905 of 1214 Page 935 of 1692
'(&.
'(&.
'(&.
'(&.
'(&.
3$*(
>
FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
7239,(:6
Cudahy Park Renovation Project, Project # PRE-001 Document Control 906 of 1214 Page 936 of 1692 67(3
3/$&(6
67(3
3/$&(6 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
(;,67,1*'(&.
67(3
,16(577$%2)
(175<:$<%$55,(5
,1726/272)'(&.
7187
/2&.:$6+(5
[3%+&6
Z3$7&+
[+(;
+($'%2/7
+(;187
[3%+&6
Z3$7&+
7187
25 25
25 25
25 Cudahy Park Renovation Project, Project # PRE-001 Document Control 907 of 1214 Page 937 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
(5*2:(/'$66
<
(5*2:(/'$66
<
(5*2:(/'$66
<
3(*&$3
(;7(16,21
[3%+&6Z3$7&+
7187
[3%+&6Z3$7&+
[+(;+($'%2/7
/2&.:$6+(5
+(;187
7187
)/$7:$6+(5
2'
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW +$5':$5(&203/(7(
+$5':$5(&203/(7(
+$5':$5(&203/(7(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 908 of 1214 Page 938 of 1692 $66(0%/<9,(:
6+2:1
R
+557'&4'8+5'&
ÄÄÄ
56''.
&47/
56''.&47/
#+4.1%-%1)
(41)5.+&'27<<.'
69+56$#..470
A Company
%1.149*''.
R
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
8372
8372
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 909 of 1214 Page 939 of 1692
$66(0%/<9,(: 3$*(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 910 of 1214 Page 940 of 1692 3/$19,(:
7239,(:
3$*(
(;,67,1*
835,*+7
>FP@
>FP@
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 911 of 1214 Page 941 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
[
3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
7187
[
3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
(;,67,1*
'(&.
(;,67,1*
835,*+7
Cudahy Park Renovation Project, Project # PRE-001 Document Control 912 of 1214 Page 942 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[3%+&6
Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
7187
)5217
6,'(
%$&.
6,'(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 913 of 1214 Page 943 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
6+257&5$:/78%(3$1(/
67((/'580*$'*(7
$,5/2&.&2**$'*(7
)52*6/,'(38==/(*$'*(7
7:,67%$//581*$'*(7
&2/25:+((/*$'*(7
[3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
7187
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
7187
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 914 of 1214 Page 944 of 1692 R
+557'&4'8+5'&
ÄÄÄ
52.+66'4
9+6*%4#)
Ä
Ä
Ä
A Company
R
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the assembly
details for the specific hardware required in
each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
ASSEMBLY VIEW
90869 SHOWN
217462
217460
217463
217460
Cudahy Park Renovation Project, Project # PRE-001 Document Control 915 of 1214 Page 945 of 1692 PAGE 2
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(3 REQUIRED)
EXISTING
UPRIGHTS
3'-5 1/8" [104.53 cm]
4'-2" [126.93 cm]
0'-4 5/8" [11.82 cm]
9'-5 7/16" [288.17 cm]
8'-8 9/16" [265.62 cm]
4'-6 5/8" [138.69 cm]
4'-1" [124.46 cm]
PLAN VIEW
90869
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
.18 CUBIC YARDS
[.14 CUBIC METERS]
0'-3 1/4" [8.29 cm]
3'- 1/2" [92.71 cm]
4'-1 1/2" [125.72 cm] 3'-10 1/2" [118.14 cm]
8'-0" [243.86 cm]
9'-2 11/16" [281.16 cm]
PLAN VIEW
90868
3'- 1/2" [92.71 cm]
0'-2 1/2" [6.35 cm]
PLAN VIEW
90870
5'- 1/8" [152.66 cm] 3'-6" [106.75 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(3 REQUIRED)
8'-6 1/8" [259.41 cm]
9'-5" [287.07 cm]
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20 cm] DEEP
(3 REQUIRED)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 916 of 1214 Page 946 of 1692 PAGE 3
ELEVATION VIEW
90869 SHOWN
OTHERS SIMILAR
TOP VIEW
90870 SHOWN
4'-9 1/4" [145.44 cm]
9'-9 1/16" [297.37 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
7'-0" [213.36 cm]
RESILIENT SURFACE
FINISHED SURFACE
4'-8 1/16" [142.43 cm]
9'-6 3/4" [291.51 cm]
4'-7 3/4" [141.67 cm]
9'-9 5/16" [297.91 cm]
TOP VIEW
90868 SHOWN
TOP VIEW
90869 SHOWN
217460
Cudahy Park Renovation Project, Project # PRE-001 Document Control 917 of 1214 Page 947 of 1692 PAGE 4
1'-0" [30.48 cm]
VARIES
(REFER TO OVERALL
SHOCK ABSORBING
MATERIAL
3.9" [10.00 cm]
MAX.
45` MIN.
CONCRETE
BRICK OR
EQUIVALENT
SHOCK ABSORBING PROPERTIES OF SURFACING
MATERIALS VARY. IF YOU DETERMINE THAT LESS
THAN 1'-0" [30.48cm] OF SURFACING IS REQUIRED,
MAKE UP THE DIFFERENCE IN ELEVATION WITH
EARTH, BEFORE APPLYING SURFACING.
"A"
"B"
UNIT GROUND PLAN)
1 1/16" [2.70 cm]
1 5/16" [3.33 cm]
1 5/8" [4.13 cm]
1 7/8" [4.83 cm]
2 3/8" [6.03 cm]
3 1/2" [8.89 cm]
5" [12.70 cm]
5" [12.70 cm]
TRACK RIDE & SWINGS
(PIPE SIZE)
DIA. "A"
1'-2" [35.56 cm]
1'-6" [45.72 cm]
1'-6" [45.72cm]
2'-0" [60.96 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
(FOOTING SIZE)
DIA. "B"
-SUGGESTED MINIMUM CONCRETE
OF EUROPEAN STANDARD EN1176-1 ONLY
-SLOPED FOOTING IS A REQUIREMENT
RATING: 3000 PSI
NOTES:
BRICK OR
DIMENSIONED
TO TOP OF 5" [12.70 cm]
TREE SCAPE
4'-0" [121.92 cm]
EARTH
EQUIVALENT
FOOTING DETAIL
Cudahy Park Renovation Project, Project # PRE-001 Document Control 918 of 1214 Page 948 of 1692 STEP 1
2 PLACES
STEP 2
2 PLACES
PAGE 5
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
3/8" BARREL NUT
(804804)
217462 217460
3/8" LOCK WASHER
(817334)
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
217462
217460
208558
3/8" BARREL NUT
(804804)
3/8" LOCK WASHER
(817334)
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
217460
217418
Cudahy Park Renovation Project, Project # PRE-001 Document Control 919 of 1214 Page 949 of 1692 STEP 3
STEP 4
2 PLACES
PAGE 6
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
208558
3/8" BARREL NUT
(804804)
3/8" FLAT WASHER
(817410)
3/8" LOCK WASHER
(817334)
3/8" x 1 1/2"
P.B.H.C.S. w/PATCH
(812053)
217460
217460
3/8" T-NUT (804556)
3/8" FLAT WASHER
(817410)
3/8" LOCK WASHER
(817334)
3/8" x 1" P.B.H.C.S.
w/PATCH (812050)
217460
Cudahy Park Renovation Project, Project # PRE-001 Document Control 920 of 1214 Page 950 of 1692 STEP 4
5 PLACES
STEP 5
7 PLACES
PAGE 7
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
3/8" x 1" P.B.H.C.S.
w/PATCH (812050)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1" O.D.) (817401)
3/8" BARREL NUT
(804804)
217463
217463
3/8" x 1 1/2"
P.B.H.C.S. w/PATCH
(812053)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(817410)
3/8" BARREL NUT
(804804)
217460
217460
217460
217463
NOTE: USE WELD ASSEMBLY (217460) HOLES
AS TEMPLATE TO FIELD DRILL 9/16"
HOLES IN HDPE PANELS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 921 of 1214 Page 951 of 1692 PAGE 8
Parts List
DESCRIPTION 90868 90869 90870 PART NUMBER
SPLITTER WELD ASSEMBLY 001 217408
SPLITTER WELD ASSEMBLY 010 217460
SPLITTER WELD ASSEMBLY 100 217469
SWAGED FORMED PIPE 001 217416
SWAGED FORMED PIPE 010 217462
SWAGED FORMED PIPE 100 217471
SWAGED PIPE 111 217418
SWAGED PIPE 111 208558
SPLITTER STRETCHED HEX HDPE 001 208518
SPLITTER STRETCHED HEX HDPE 010 217463
SPLITTER STRETCHED HEX HDPE 100 217472
001 217473
010 217474
100 217475
3/8" x 1" P.B.H.C.S. w/PATCH 10 9 10 812050*
3/8" x 1 1/2" P.B.H.C.S. w/PATCH 5 66 812053*
3/8" x 2" P.B.H.C.S. w/PATCH 444 812055*
3/8" FLAT WASHER (1" O.D.) 8 7 8 817401*
3/8" LOCK WASHER 19 19 20 817334*
3/8" FLAT WASHER 7 88 817410*
3/8" BARREL NUT 17 17 18 804804*
3/8" T-NUT 222 804556*
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 922 of 1214 Page 952 of 1692 R
+557'&4'8+5'&
ÄÄÄ
52+4#.
5.+&'9+6*
4161*11&
Ä
Ä
Ä
Ä
A Company
Ä
R
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment,
read the enclosed INSTALLER
INSTRUCTIONS in the installation
booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the
assembly details for the specific
hardware required in each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL
ENTIRE STRUCTURE IS COMPLETELY
ASSEMBLED AND LEVEL.
ASSEMBLY VIEW
90880 SHOWN
OTHERS SIMILAR
EXIT HEIGHT CHART
STANDARD EXIT HEIGHT from SURFACING
ASTM 7" TO 15"
CSA 175mm TO 380mm
EN 350mm OR LESS
217766
215627
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UP TO
5'-0"
ALL
Cudahy Park Renovation Project, Project # PRE-001 Document Control 923 of 1214 Page 953 of 1692 PAGE 2
4'-1" [124.46 cm]
4'-11" [149.83 cm]
6'-10 1/4" [208.88 cm]
1'- 1/2" [31.75 cm]
2'- 1/2" [62.25 cm]
P3'-0" [P91.44 cm] DIAMETER x
2'-6" [76.20cm] DEEP
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20cm] DEEP
EXISTING
UPRIGHTS
TYP
4'-0" [121.92 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
0'-7 9/16" [19.22 cm]
BRICK OR EQUIVALENT ELEVATION VIEW 4'-0" SUPPLIED BY OTHERS
CONCRETE REQUIRED
.45 CUBIC YARDS
[.35 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
PLAN VIEW
90880
4'-6 1/8" [137.55 cm]
7'-8 9/16" [235.14 cm]
TOP VIEW
90880
FINISHED SURFACE
RESILIENT SURFACE
218822
202137
Cudahy Park Renovation Project, Project # PRE-001 Document Control 924 of 1214 Page 954 of 1692 PAGE 3
4'-1" [124.46 cm]
4'-11" [149.83 cm]
6'-10 1/4" [208.88 cm]
1'- 1/2" [31.75 cm]
2'- 1/2" [62.25 cm]
P3'-0" [P91.44 cm] DIAMETER x
2'-6" [76.20cm] DEEP
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20cm] DEEP
4'-6" [137.16 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
1'-1 9/16" [34.46 cm]
EXISTING
UPRIGHTS
TYP
BRICK OR EQUIVALENT
ELEVATION VIEW 4'-6" SUPPLIED BY OTHERS
PLAN VIEW
90881
CONCRETE REQUIRED
.45 CUBIC YARDS
[.35 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
4'-6 1/8" [137.55 cm]
7'-8 9/16" [235.14 cm]
TOP VIEW
90881
FINISHED SURFACE
RESILIENT SURFACE
202137
218822
Cudahy Park Renovation Project, Project # PRE-001 Document Control 925 of 1214 Page 955 of 1692 PAGE 4
4'-1" [124.46 cm]
3'-11 11/16" [121.18 cm]
5'-10 15/16" [180.22 cm]
1'- 1/2" [31.75 cm]
2'- 1/2" [62.25 cm]
P3'-0" [P91.44 cm] DIAMETER x
2'-6" [76.20cm] DEEP
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20cm] DEEP
EXISTING
UPRIGHTS
TYP
5'-0" [152.40 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
0'-7 9/16" [19.22 cm]
BRICK OR EQUIVALENT ELEVATION VIEW 5'-0" SUPPLIED BY OTHERS
PLAN VIEW
90882
CONCRETE REQUIRED
.45 CUBIC YARDS
[.35 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
4'-6 1/8" [137.55 cm]
6'-9 5/16" [206.49 cm]
TOP VIEW
90882
FINISHED SURFACE
RESILIENT SURFACE
176107
218826
Cudahy Park Renovation Project, Project # PRE-001 Document Control 926 of 1214 Page 956 of 1692 PAGE 5
4'-1" [124.46 cm]
3'-11 11/16" [121.18 cm]
5'-10 15/16" [180.22 cm]
1'- 1/2" [31.75 cm]
2'- 1/2" [62.25 cm]
P3'-0" [P91.44 cm] DIAMETER x
2'-6" [76.20cm] DEEP
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20cm] DEEP
EXISTING
UPRIGHTS
TYP
5'-6" [167.64 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
1'-1 9/16" [34.46 cm]
BRICK OR EQUIVALENT ELEVATION VIEW 5'-6" SUPPLIED BY OTHERS
PLAN VIEW
90883
CONCRETE REQUIRED
.45 CUBIC YARDS
[.35 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
4'-6 1/8" [137.55 cm]
6'-9 5/16" [206.49 cm]
TOP VIEW
90883
FINISHED SURFACE
RESILIENT SURFACE
176107
218826
Cudahy Park Renovation Project, Project # PRE-001 Document Control 927 of 1214 Page 957 of 1692 PAGE 6
4'-1" [124.46 cm]
3'-11 3/4" [121.23 cm]
5'-11" [180.28 cm]
1'- 1/2" [31.75 cm]
2'- 1/2" [62.25 cm]
P3'-0" [P91.44 cm] DIAMETER x
2'-6" [76.20cm] DEEP
P1'-2" [P35.56 cm] DIAMETER x
2'-6" [76.20cm] DEEP
EXISTING
UPRIGHTS
TYP
6'-0" [182.88 cm]
1'-6" [45.72 cm]
2'-6" [76.20 cm]
0'-7 9/16" [19.22 cm]
BRICK OR EQUIVALENT ELEVATION VIEW 6'-0" SUPPLIED BY OTHERS
PLAN VIEW
90884
CONCRETE REQUIRED
.45 CUBIC YARDS
[.35 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
4'-6 1/8" [137.55 cm]
6'-9 5/16" [206.54 cm]
TOP VIEW
90884
FINISHED SURFACE
RESILIENT SURFACE
218830
176103
Cudahy Park Renovation Project, Project # PRE-001 Document Control 928 of 1214 Page 958 of 1692 DETAIL VIEW PAGE 7
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
ATTACH FOOTBUCK, GROUND SOCKET,
AND HOOD WHILE SLIDE IS ON THE GROUND.
217766
215627
168601
168606
200033
168608
OR
OR
217766
215627
3/8" x 3 1/4"
P.B.H.C.S. w/PATCH
(812060)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
1/2" x 3 1/2" HEX
HEAD BOLT (801213)
215627
168601
168606
OR
3/8" FLAT WASHER
(817410)
3/8" LOCK WASHER
(817334)
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
200033
168608
OR
STEP 1
STEP 2
STEP 3
2 PLACES
215627
1/2" LOCKNUT
(804355)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 929 of 1214 Page 959 of 1692 PAGE 8
STEP 5
2 PLACES
STEP 5: TAB OF HANDRAIL WELD
ASSEMBLY TO BE MOUNTED
TO FACE OF DECK
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
ATTACH HANDRAILS TO
EXISTING STRUCTURE
90880 SHOWN
OTHERS SIMILAR 3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" LOCK WASHER
(817334)
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
3/8" T-NUT (804556)
TAB TO BE MOUNTED
TO FACE OF DECK
218822
EXISTING
DECK
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
3/8" LOCK WASHER
(817334)
ALUM. PIN (203568) A03650
218819
NOTE: BOLT SHOULD BE
TORQUED FROM
20-25 FT. LBS. FOR
PROPER INSTALLATION.
EXISTING
UPRIGHT
STEP 4
2 PLACES
Cudahy Park Renovation Project, Project # PRE-001 Document Control 930 of 1214 Page 960 of 1692 PAGE 9
3/8" T-NUT (804556)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" LOCK WASHER
(817334)
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
202137
EXISTING
DECK
STEP 6
2 PLACES
202137
218822
STEP 7
2 PLACES
3/8" T-NUT (804556)
3/8" LOCK WASHER
(817334)
3/8" x 1 1/2"
P.B.H.C.S. w/PATCH
(812053)
218822
218819
202137
90880 SHOWN
OTHERS SIMILAR
ATTACH HANDRAILS AND PLATFORM
TO EXISTING STRUCTURE.
A03650
Cudahy Park Renovation Project, Project # PRE-001 Document Control 931 of 1214 Page 961 of 1692 PAGE 10
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
215627
202137
3/8" x 1 3/4"
P.B.H.C.S. w/PATCH
(812054)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
STEP 8
2 PLACES
215627
217766
202137
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" LOCK WASHER
(817334) 3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
202137
STEP 9 217766
2 PLACES
PLACE SPIRAL SLIDE ASSEMBLY IN
GROUND HOLES AND ATTACH TO PLATFORM
90880 SHOWN
OTHERS SIMILAR
Cudahy Park Renovation Project, Project # PRE-001 Document Control 932 of 1214 Page 962 of 1692 DETAIL VIEW PAGE 11
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
90880 SHOWN
OTHERS SIMILAR
3/8" LOCK WASHER
(817334)
3/8" x 2 1/4"
P.B.H.C.S. w/PATCH
(812056)
218819
217766
ATTACH HOOD TO HANDRAILS
218819
217766
215627
218822
202137
STEP 10
2 PLACES
Cudahy Park Renovation Project, Project # PRE-001 Document Control 933 of 1214 Page 963 of 1692 PAGE 12
Parts List
DESCRIPTION 90880 90881 90882 90883 90884 PART NUMBER
360 SPIRAL SLIDE 11111 215627
360 SPIRAL SLIDE HOOD 11111 217766
COATED STEPPED PLATFORM 00011 202137
COATED STEPPED PLATFORM 01100 176107
COATED STEPPED PLATFORM 10000 176103
LEFT HANDRAIL WELD ASSEMBLY 00011 218819
LEFT HANDRAIL WELD ASSEMBLY 01100 218824
LEFT HANDRAIL WELD ASSEMBLY 10000 218828
RIGHT HANDRAIL WELD ASSEMBLY 00011 218822
RIGHT HANDRAIL WELD ASSEMBLY 01100 218826
RIGHT HANDRAIL WELD ASSEMBLY 10000 218830
TRU-LOC 22222 A03650
FOOTBUCK 10101 200033
FOOTBUCK 01010 168608
GROUND SOCKET 10101 168601
GROUND SOCKET 01010 168606
01111 218831
10000 218832
3/8" x 3/4" P.B.H.C.S. w/PATCH 10 10 10 10 8 812052*
3/8" x 1 1/4" P.B.H.C.S. w/PATCH 22222 812051*
3/8" x 1 1/2" P.B.H.C.S. w/PATCH 22222 812053*
3/8" x 1 3/4" P.B.H.C.S. w/PATCH 22222 812054*
3/8" x 2" P.B.H.C.S. w/PATCH 22222 812055*
3/8" x 2 1/4" P.B.H.C.S. w/PATCH 22222 812056*
3/8" x 3 1/4" P.B.H.C.S. w/PATCH 22222 812060*
3/8" FLAT WASHER (1 1/4" O.D.) 12 12 12 12 10 817424*
3/8" FLAT WASHER 44444 817410*
3/8" LOCK WASHER 22 22 22 22 20 817334*
3/8" T-NUT 68888 804556*
1/2" x 3 1/2" HEX HEAD BOLT 22222 801213*
1/2" LOCKNUT 22222 804355*
ALUM. PIN 22222 203568*
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
HARDWARE COMPLETE
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 934 of 1214 Page 964 of 1692
ASSEMBLY VIEW
91100 SHOWN
R
+557'&4'8+5'&
ÄÄÄ
&17$.'
$7$$.'
%.+/$'4
Ä6*47Ä
Ä6*47Ä
Ä6*47Ä
A Company
R
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the assembly
details for the specific hardware required in
each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
203269
203271
REFER TO MODULAR EQUIPMENT TOP VIEW
FOR CORRECT ENRTYWAY NUMBER.
ENRTYWAY MUST BE INSTALLED PRIOR
TO ATTACHMENT OF THIS PRODUCT.
205559
Cudahy Park Renovation Project, Project # PRE-001 Document Control 935 of 1214 Page 965 of 1692 4'-0" VIEW
91097
4'-6" VIEW
91097
5'-0" VIEW
91097
5'-6" VIEW
91100
6'-0" VIEW
91100
6'-6" VIEW
91100
7'-0" VIEW
91103
7'-6" VIEW
91103
8'-0" VIEW
91103
2 PAGE
4'-0" [122.82 cm] 4'-6" [137.50 cm] 5'-0" [152.40 cm]
5'-6" [167.64 cm] 6'-0" [182.99 cm] 6'-6" [198.02 cm]
8'-0" [243.97 cm] 7'-6" [228.60 cm] 7'-0" [213.60 cm]
DECK HEIGHT
ELEVATIONS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 936 of 1214 Page 966 of 1692
PLAN VIEW
3 PAGE
CONCRETE REQUIRED:
.19 CUBIC YARDS
[.15 CUBIC METERS]
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
TABLE
PRODUCT # DECK HEIGHT 'A' 'B'
91097
4'-0"
4'-6"
5'-0"
3'-8" [111.25 cm]
2'-11 1/2" [90.73 cm]
1'-11 1/2" [59.96 cm]
3'-10" [116.43 cm]
3'-2" [97.00 cm]
2'-3" [69.09 cm]
91100
5'-6"
6'-0"
6'-6"
4'-11 1/2" [150.70 cm]
4'-3" [129.90 cm]
3'-5" [103.89 cm]
5'-1" [154.56 cm]
4'-5" [134.36 cm]
3'-7" [109.41 cm]
91103
7'-0"
7'-6"
8'-0"
4'-6" [137.42 cm]
3'-6 1/2" [107.35 cm]
2'-1 1/2" [64.55 cm]
4'-8" [141.65 cm]
3'-8 1/2" [112.71 cm]
2'-5" [73.11 cm]
4'-1" [124.46 cm]
2'-11 1/2" [90.13 cm]
'B'
'A'
P1'-2" [P35.56 cm] DIAMETER x
3'-0" [91.44 cm]
2'-6" [76.20 cm] DEEP
(1 REQ'D)
1'-1 1/2" [34.30 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 937 of 1214 Page 967 of 1692 4 PAGE
4'- 15/16" [124.36 cm] 3'-4 7/16" [102.69 cm] 2'-4 1/2" [72.37 cm] 5'-4 5/8" [164.11 cm] 4'-8 1/8" [142.48 cm] 3'-8 1/2" [112.98 cm] 4'-10 15/16" [149.65 cm] 3'-10 11/16" [118.52 cm] 2'-7 1/2" [80.04 cm]
TOP VIEWS
91097
4'-0" DECK
91097
4'-6" DECK
91097
5'-0" DECK
91100
5'-6" DECK
91100
6'-0" DECK
91100
6'-6" DECK
91103
7'-0" DECK
91103
7'-6" DECK
91103
8'-0" DECK
4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm]
4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm] 4'-6 1/8" [137.55 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 938 of 1214 Page 968 of 1692
ELEVATION VIEW
4'-0" SHOWN
OTHERS SIMILAR
5 PAGE
1'-0" [30.48 cm]
VARIES
(REFER TO OVERALL
SHOCK ABSORBING
MATERIAL
3.9" [10.00 cm]
MAX.
45` MIN.
CONCRETE
BRICK OR
EQUIVALENT
SHOCK ABSORBING PROPERTIES OF SURFACING
MATERIALS VARY. IF YOU DETERMINE THAT LESS
THAN 1'-0" [30.48cm] OF SURFACING IS REQUIRED,
MAKE UP THE DIFFERENCE IN ELEVATION WITH
EARTH, BEFORE APPLYING SURFACING.
"A"
"B"
UNIT GROUND PLAN)
1 1/16" [2.70 cm]
1 5/16" [3.33 cm]
1 5/8" [4.13 cm]
1 7/8" [4.83 cm]
2 3/8" [6.03 cm]
3 1/2" [8.89 cm]
5" [12.70 cm]
(PIPE SIZE)
DIA. "A"
1'-2" [35.56 cm]
1'-6" [45.72 cm]
1'-6" [45.72cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
(FOOTING SIZE)
DIA. "B"
-SUGGESTED MINIMUM CONCRETE
OF EUROPEAN STANDARD EN1176-1 ONLY
-SLOPED FOOTING IS A REQUIREMENT
RATING: 3000 PSI
NOTES:
BRICK OR
DIMENSIONED
TO TOP OF
EARTH
EQUIVALENT
FOOTING DETAIL
RESILENT SURFACE
FINISHED SURFACE
1'-6" [45.72 cm]
2'-6" [76.20 cm]
4'-0" [121.92 cm]
205548
203271
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 939 of 1214 Page 969 of 1692 STEP 2
2 PLACES
STEP 3
2 PLACES
6 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
205567
205559
205548
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.)
(817424)
3/8" T-NUT (804556)
203269
EXISTING
ENTRYWAY
BARRIER
EXISTING DECK
STEP 1
INSERT TAB OF
ENTRYWAY BARRIER
INTO SLOT OF DECK
205548
203269
203269
205567
205559
205548
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
3/8" LOCK WASHER
(817334)
OR
OR
OR
OR
3/8" x 3/4"
P.B.H.C.S. w/PATCH
(812052)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 940 of 1214 Page 970 of 1692 STEP 3
2 PLACES
7 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
205548
205559
205567
203271
3/8" FLAT WASHER
(1 1/4" O.D.)
(817424)
3/8" LOCK WASHER
(817334)
3/8" x 1 3/4"
P.B.H.C.S. w/PATCH
(812054)
3/8" T-NUT (804556)
205548
205559
205567
203271
OR
OR
OR
OR
Cudahy Park Renovation Project, Project # PRE-001 Document Control 941 of 1214 Page 971 of 1692 Parts List
DESCRIPTION 91097 91100 91103 PART NUMBER
CLIMBER WELD ASS'Y 001 205548
CLIMBER WELD ASS'Y 010 205559
CLIMBER WELD ASS'Y 100 205567
MOUNTING BRACKET 111 203269
FOOTBUCK 222 203271
111 205705
3/8" x 3/4" P.B.H.C.S. w/PATCH 222 812052*
3/8" x 1 1/4" P.B.H.C.S. w/PATCH 222 812051*
3/8" x 1 3/4" P.B.H.C.S. w/PATCH 222 812054*
3/8" LOCK WASHER 666 817334*
3/8" FLAT WASHER (1 1/4" O.D.) 444 817424*
3/8" T-NUT 444 804556*
8 PAGE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 942 of 1214 Page 972 of 1692 R
R
+557'&4'8+5'&
ÄÄÄ
INSTALLATION
PARTS LIST
DETAIL
REFERENCE
=
=
%.+/$'4
1((5'6
'064;9#;
$#44+'4
A Company
10/7/2015
The CPSC recommends age separation on
playgrounds. Supervise children to ensure
separation between 2 to 5 preschoolers and 5 to
12 year old school aged children.
This play equipment is
designed for children age
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment,
read the enclosed INSTALLER
INSTRUCTIONS in the installation
booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the
assembly details for the specific
hardware required in each connection.
4'-6 1/8" [137.52 cm]
0'-5 1/8" [13.09 cm]
ASSEMBLY VIEW
TOP VIEW
1 087
747
Cudahy Park Renovation Project, Project # PRE-001 Document Control 943 of 1214 Page 973 of 1692 Parts List
ITEM DESCRIPTION QTY PART NUMBER
1 OFFSET BARRIER ENCLOSURE 1 211086
TRU-LOC 1 A03650
HARDWARE COMPLETE 1 211104
3/8" x 3/4" P.B.H.C.S. w/PATCH 2 812052*
3/8" LOCKWASHER 2 817334*
3/8" FLAT WASHER (1 1/4" O.D.) 2 817424*
3/8" T-NUT 2 804556*
ALUM. PIN 1 203568*
3/8" x 2" P.B.H.C.S. w/PATCH 1 812055*
2 PAGE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 4'-1" [124.46 cm]
EXISTING
UPRIGHTS
GROUND PLAN
Cudahy Park Renovation Project, Project # PRE-001 Document Control 944 of 1214 Page 974 of 1692 3 PAGE
IMPORTANT
TO REDUCE THE RISK OF CLOTHING ENTANGLEMENT IN COMPLIANCE WITH ASTM F1487, ANY BOLT END
PROTRUDING MORE THAN TWO FULL THREADS BEYOND THE FACE OF THE NUT SHALL BE CUT-OFF FLUSH, FILED SMOOTH AND TREATED TO PREVENT CORROSION.
NOTE: LOCTITE (SUPPLIED BY OTHERS) SHOULD BE USED ON ALL THREADED HARDWARE.
NOTE: AFTER ASSEMBLY IS COMPLETE, PEEN TEE-NUTS AND FLATWASHERS TO MATCH RADIUS OF PIPE. 13 2 3 4 5 6
&'6#+.5ÄHQTÄ
0 INCH 1
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
3/8" x 3/4" P.B.H.C.S.
w/PATCH (812052)
3/8" LOCKWASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
DECK
ENCLOSURE
3/8" T-NUT (804556)
*NOTE:
BOLT SHOULD BE
TORQUED FROM
20-25 FT. LBS. FOR
PROPER INSTALLTION.
ALUM. PIN (203568) ( * = A OR Z )
3/8" LOCKWASHER
(817334)
TRU-LOC
(*03650)
UPRIGHT
RUNG
3/8" x 2" P.B.H.C.S.
w/PATCH (812055)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 945 of 1214 Page 975 of 1692 R
+557'&4'8+5'&
ÄÄÄ
1.;/275
%.+/$'4
ÄÄÄ
ÄÄÄ
ÄÄÄ
$&RPSDQ\
R
$66(0%/<'5$:,1*
6+2:1
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 946 of 1214 Page 976 of 1692
'(&.+(,*+7
'(&.+(,*+7
'(&.+(,*+7
'(&.+(,*+7
'(&.+(,*+7 3$*(
>FP@
>
FP@
>FP@
>
FP@
>FP@
)227+2/(
)227+2/( )227+2/(
)227+2/(
)227+2/(
),(/''5,//
),(/''5,//
),(/''5,//
),(/''5,// ),(/''5,//
Cudahy Park Renovation Project, Project # PRE-001 Document Control 947 of 1214 Page 977 of 1692
'(&.+(,*+7
'(&.+(,*+7
'(&.+(,*+7
'(&.+(,*+7
3$*(
>FP@
>FP@
>FP@
>FP@
)227+2/(
)227+2/(
)227+2/(
)227+2/(
),(/''5,//
),(/''5,//
),(/''5,//
),(/''5,//
Cudahy Park Renovation Project, Project # PRE-001 Document Control 948 of 1214 Page 978 of 1692 3/$19,(:
7239,(:
3$*(
>FP@
>FP@
(;,67,1*835,*+7
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 949 of 1214 Page 979 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
[
3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
25 [3%+&6
Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
2'
(;,67,1*(175<:$<
(;,67,1*'(&.
7187
(;,67,1*835,*+7
)227+2/(3/$&(0(17
&5,7,&$/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 950 of 1214 Page 980 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
)/$7:$6+(5
2'
/2&.:$6+(5
[
3%+&6Z3$7&+
187,16(57
7<3(
+:1
25 ),(/''5,//+2/(72',$0(7(5
86()250('%5$&.(7$1'7235$,/:(/'$66(0%/<
$67(03/$7(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 951 of 1214 Page 981 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
7187
[
3%+&6Z3$7&+
)/$7:$6+(5
/2&.:$6+(5
&/,0%(5
+$1'+2/'
)227+2/(3/$&(0(17
&5,7,&$/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 952 of 1214 Page 982 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
7235$,/:(/'$66(0%/<
2/<0386&/,0%(5+'3(
2/<0386&/,0%(5+'3(
2/<0386&/,0%(5+'3(
)250('7$%
[3%+&6Z3$7&+
)/$7:$6+(5
2'
/2&.:$6+(5
187,16(577<3( +:1
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
2'
)/$7:$6+(5
/2&.:$6+(5
7187
&/,0%(5+$1'+2/'
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW Cudahy Park Renovation Project, Project # PRE-001 Document Control 953 of 1214 Page 983 of 1692
ASSEMBLY DRAWING
R
+557'&4'8+5'&
ÄÄÄ
#+4
9#.-'4
(64+5' A Company
R
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the assembly
details for the specific hardware required in
each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
217374
217371
217370
217369
217368
217355
217355
217363
217359
217365
217376
217361
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
218529
218529
NOTE: TABS ON RAILS
SHOULD ANGLE TO
THE CENTER.
218525
217336
218526
217336 217344
217344
Cudahy Park Renovation Project, Project # PRE-001 Document Control 954 of 1214 Page 984 of 1692
TOP VIEW
PAGE 2
8'-7 1/4" [262.20 cm]
4'-6 1/8" [137.55 cm]
2'-10" [86.36 cm]
4'-11 1/2" [151.13 cm]
8'-2" [248.92 cm]
TYP
2'- 1/2" [62.23 cm]
TYP
4'-1" [124.46 cm]
P1'-6" [P45.72 cm] x DIAMETER
3'-6" [106.68 cm] DEEP
(2 REQUIRED)
EXISTING
UPRIGHTS
PLAN VIEW
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE BASED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED
.46 CUBIC YARDS
[ .35 CUBIC METERS]
3'-6" [106.68 cm]
2'-6" [76.20 cm]
5'-0" [152.40 cm]
1'-0" [30.48 cm]
ELEVATION VIEW
BRICK OR EQUIVALENT
(SUPPLIED BY OTHERS)
RESILIENT SURFACE
FINISHED SURFACE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 955 of 1214 Page 985 of 1692 STEP 1
16 PLACES
STEP 2
8 PLACES
PAGE 3
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
OR
217374
217376 EXISTING
UPRIGHTS
3/8" FLAT WASHER
(817410)
3/8" LOCK WASHER
(817334)
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
217371
217370
217369
217376
217368
217374
5/16" x 5/8" BUTTON
HEAD SHOULDER
BOLT (802742)
5/16" LOCK WASHER
(817330)
1/4" BARREL NUT
(804809)
217368
217369
217370
217371
OR
OR
OR
217374
217376
OR
Cudahy Park Renovation Project, Project # PRE-001 Document Control 956 of 1214 Page 986 of 1692 STEP 3
8 PLACES
STEP 4
8 PLACES
PAGE 4
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
OR
217359
217361
217359
217368
217369
217370
217374
217368
217369
217370
217371
OR
OR
217363
217361
217336 1/4" BARREL NUT
(804809)
5/16" LOCK WASHER
(817330)
5/16" x 5/8" BUTTON
HEAD SHOULDER
BOLT (802742)
217359
217376
OR
OR
217336
3/8" PLASTIC
SPACER (817613)
217359
217363
161853
OR
217371
Cudahy Park Renovation Project, Project # PRE-001 Document Control 957 of 1214 Page 987 of 1692 STEP 6
8 PLACES
STEP 5
8 PLACES
PAGE 5
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
OR
217361
217344
217363
217359
217359
217361
217363
217344
217365
OR
OR
161853
3/8" PLASTIC
SPACER (817613)
3/8" PLASTIC
SPACER (817613)
217344 OR
3/8" FLAT WASHER
(817410)
3/8" LOCK WASHER
(817334)
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
217365
217365
Cudahy Park Renovation Project, Project # PRE-001 Document Control 958 of 1214 Page 988 of 1692 STEP 8
2 PLACES
STEP 7
2 PLACES
PAGE 6
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
218529
161853
218526
218525
218529
218526
218525
217363
3/8" PLASTIC
SPACER (817613)
3/8" PLASTIC
SPACER (817613) 217363
217359
217359
OR
218526
218525
OR
OR
Cudahy Park Renovation Project, Project # PRE-001 Document Control 959 of 1214 Page 989 of 1692 STEP 9
18 PLACES
PAGE 7
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
217355
217359
217363
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424) 3/8" LOCK NUT
(804353)
217359
217361
217363
OR
OR
217361
Cudahy Park Renovation Project, Project # PRE-001 Document Control 960 of 1214 Page 990 of 1692 PAGE 8
Parts List
DESCRIPTION QTY PART NUMBER
RIGHT WELD ASSEMBLY 1 217376
LEFT WELD ASSEMBLY 1 217374
COATED PLATE 3 217355
COATED PLATE FOOTBUCK WELD ASSEMBLY 2 218529
TOP RING WELD ASSEMBLY 1 217361
MIDDLE RING WELD ASSEMBLY 1 217363
BOTTOM RING WELD ASSEMBLY 1 217359
TAB WELD ASSEMBLY 4 217365
CABLE ASSEMBLY 2 217368
CABLE ASSEMBLY 2 217369
CABLE ASSEMBLY 2 217370
CABLE ASSEMBLY 2 217371
1 217382
5/16" x 5/8" BUTTON HEAD SHOULDER BOLT 16 802742*
5/16" LOCK WASHER 16 817330*
1/4" BARREL NUT 16 804809*
3/8" x 1 1/4" P.B.H.C.S. w/PATCH 42 812051*
3/8" FLAT WASHER 24 817410*
3/8" FLAT WASHER (1 1/4" O.D.) 36 817424*
3/8" LOCK WASHER 24 817334*
3/8" PLASTIC SPACER 36 817613*
3/8" LOCK NUT 18 804353*
CHAIN 6" LG 4 217336*
CHAIN 12 15/16" LG 4 217344*
CHAIN 42 1/8" LG 1 218525*
CHAIN 54 5/8" LG 1 218526*
D SHACKLE w/NO-SNAG PIN 20 161853*
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 961 of 1214 Page 991 of 1692
ASSEMBLY VIEW
R
+557'&4'8+5'&
ÄÄÄ
4+22.'2#55
A Company .+0-
R
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as shown in the
ASSEMBLY DRAWING. Refer to the assembly
details for the specific hardware required in
each connection.
3. LOCTITE (SUPPLIED BY OTHERS)
SHOULD BE USED ON ALL THREADED
HARDWARE.
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
218039
218346
218345
218347
218346
218347
217915
218345
218351
REFER TO MODULAR EQUIPMENT
TOP VIEW FOR CORRECT
ARCHWAY NUMBER
222706
222706
Cudahy Park Renovation Project, Project # PRE-001 Document Control 962 of 1214 Page 992 of 1692
TOP VIEW
PAGE 2
4'-6 1/8" [137.55 cm]
8'-7" [261.57 cm]
PLAN VIEW
EXISTING
UPRIGHTS
8'-2" [248.92 cm]
9'-1 9/16" [278.30 cm]
4'-1" [124.46 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 963 of 1214 Page 993 of 1692 STEP 2
4 PLACES
STEP 1
16 PLACES
PAGE 3
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
217915
218039
217915
218351
218039
OR
EXISTING
UPRIGHT
3/8" FLAT WASHER
(817410)
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
3/8" x 1 1/2"
P.B.H.C.S. w/PATCH
(812053)
3/8" LOCK WASHER
(817334)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" FLAT WASHER
(1 1/4" O.D.) (817424)
3/8" EYE NUT
(804780)
NOTE: TAB MUST BE
INSIDE SLOT OF DECK.
D SHACKLE w/NO-SNAG PIN
(161583)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 964 of 1214 Page 994 of 1692 STEP 3
4 PLACES
STEP 4
8 PLACES
PAGE 4
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
3/8" PLASTIC SPACER (817613) TO BE
INSTALLED INSIDE D-SHACKLE.
217365
218351
217365
217365
218351
217365
3/8" PLASTIC
SPACER (817613)
3/8" PLASTIC
SPACER (817613)
D SHACKLE
w/NO-SNAG PIN
(161853)
3/8" FLAT WASHER
(817410) 3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(812051)
EXISTING
UPRIGHT
Cudahy Park Renovation Project, Project # PRE-001 Document Control 965 of 1214 Page 995 of 1692 STEP 5
4 PLACES
PAGE 5
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
217365
217365
217365
217365
EXISTING
UPRIGHT
1/4" BARREL NUT
(804809)
5/16" LOCK WASHER
(817330)
5/16" x 5/8" BUTTON
HEAD SHOULDER
BOLT (802742)
222706
222706
222706
Cudahy Park Renovation Project, Project # PRE-001 Document Control 966 of 1214 Page 996 of 1692 STEP 7
12 PLACES
STEP 6
12 PLACES
PAGE 6
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
218351
218346
218345
218347
DETAIL VIEW
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
217915
218039
217915
218346
218351
CAUTION: WHILE INSTALLING HWN0149
USE HAND TOOLS ONLY.
DO NOT USE AN IMPACT DRIVER.
DOING SO COULD DAMAGE THE PART.
218039
OR
OR
OR
218347
218345 218345
218347
218346
222706
222706
1/4" BARREL NUT
(804809)
5/16" LOCK WASHER
(817330)
5/16" x 5/8" BUTTON
HEAD SHOULDER
BOLT (802742)
222706
NUT 5/16"- INSERT
TYPE 1 (HWN0149)
5/16" FLAT WASHER
(11/16" O.D.) (817406)
5/16" x 3/4"
P.B.H.C.S. w/PATCH
(812040)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 967 of 1214 Page 997 of 1692 PAGE 7
Parts List
DESCRIPTION QTY PART NUMBER
TOP RAIL WELD ASSEMBLY 1 218039
TOP RAIL WELD ASSEMBLY 1 217915
RIPPLE WALK WELD ASSEMBLY 1 218351
TAB WELD ASSEMBLY 4 217365
SHORT HDPE SLAT 2 218345
HDPE SLAT 2 218346
LONG HDPE SLAT 2 218347
CABLE ASSEMBLY 1 222706
1 217955
1/4" BARREL NUT 16 804809*
5/16" x 5/8" BUTTON HEAD SHOULDER BOLT 16 802742*
5/16" x 3/4" P.B.H.C.S. w/PATCH 12 812040*
5/16" FLAT WASHER (11/16" O.D.) 12 817406*
5/16" LOCK WASHER 16 817330*
NUT 5/16"- INSERT TYPE 1 12 HWN0149*
3/8" x 1 1/4" P.B.H.C.S. w/PATCH 24 812051*
3/8" x 1 1/2" P.B.H.C.S. w/PATCH 4 812053*
3/8" FLAT WASHER 24 817410*
3/8" FLAT WASHER (1 1/4" O.D.) 8 817424*
3/8" LOCK WASHER 4 817334*
3/8" PLASTIC SPACER 8 817613*
3/8" EYE NUT 4 804780*
D SHACKLE w/NO-SNAG PIN 4 161853*
HARDWARE COMPLETE
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment. * Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 968 of 1214 Page 998 of 1692
ASSEMBLY VIEW
91561 SHOWN
TOP VIEW
91561 SHOWN
OTHERS SIMILAR
R
+557'&4'8+5'&
ÄÄÄ
(.19'452+00'4
2#0'.
(.19'452+00'42#0'.
(#%'%4'#6142#0'.
#22.'64''2#0'.
#059'4$#..2#0'.
A Company
R
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions during installation.
2. Assemble parts as show in the ASSEMBLY
DRAWING. Refer to the assembly details for the
specific hardware required in each connection.
3.ALL NON-PATCHED HARDWARE
REQUIRES LOCTITE (SUPPLIED BY
OTHERS.)
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
UP TO 5'-0"
DECK HEIGHTS
ALL
DECK HEIGHTS
4'-6 1/8" [137.55 cm]
0'-5 1/16" [12.87 cm]
218901
Cudahy Park Renovation Project, Project # PRE-001 Document Control 969 of 1214 Page 999 of 1692 91561
91564
91567
91570
PAGE 2
ASSEMBLY VIEW
218905
218907
218903 218901
Cudahy Park Renovation Project, Project # PRE-001 Document Control 970 of 1214 Page 1000 of 1692 STEP 1
2 PLACES
PAGE 3
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
91561 SHOWN
OTHERS SIMILAR
3/8" LOCK
WASHER (817334)
3/8" x 1 3/4" HEX
HEAD BOLT
(801006)
3/8" BARREL NUT
(804804)
3/8" x 3/4"
P.B.H.C.S.
w/PATCH (812052)
K03861
218901
EXISTING
UPRIGHT
K03861
218901
K03861
NOTE: HEX BOLTS
SHOULD BE TORQUED
FROM 20-25 FT. LBS.
FOR PROPER
INSTALLATION.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 971 of 1214 Page 1001 of 1692 STEP 2
2 PLACES
PAGE 4
13 0 INCH 1 2 3 4 56
0 CM 123 4 57 6 8 9 10 12 11 14 15
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
DETAIL VIEW
91561 SHOWN
OTHERS SIMILAR
218901
3/8" FLAT WASHER
(817410)
3/8" x 1 1/2"
P.B.H.C.S.
w/PATCH (812053)
3/8" FLAT WASHER
(1 1/4" O.D.)
(817424)
3/8" HEX NUT
(804053)
218901
EXISTING
DECK
VIEW IS FROM
UNDERNEATH
Cudahy Park Renovation Project, Project # PRE-001 Document Control 972 of 1214 Page 1002 of 1692 PAGE 5
Parts List
DESCRIPTION 91561 91564 91567 91570 PART NUMBER
FLOWER SPINNER PANEL ASSEMBLY 0001 218901
FACE CREATOR ASSEMBLY 0010 218903
APPLE TREE PANEL ASSEMBLY 0100 218905
ANSWER BALL ASSEMBLY 1000 218907
TRU-LOC PANEL ATTACHMENT 2222 K03861
1111 218909
3/8" x 3/4" P.B.H.C.S. w/PATCH 2222 812052*
3/8" x 1 1/2" P.B.H.C.S. w/PATCH 2222 812053*
3/8" x 1 3/4" HEX HEAD BOLT 2222 801006*
3/8" FLAT WASHER 2222 817410*
3/8" FLAT WASHER (1 1/4" O.D.) 2222 817424*
3/8" LOCK WASHER 2222 817334*
3/8" HEX NUT 2222 804053*
3/8" BARREL NUT 2222 804804*
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 973 of 1214 Page 1003 of 1692
ASSEMBLY VIEW
91577 SHOWN
TOP VIEW
R
+557'&4'8+5'&
ÄÄÄ
#761/16+8'4#%'
*#.(2#0'.
#761/16+8'4#%'*#.(2#0'.
#0+/#.4#%'*#.(2#0'.
52#%'4#%'*#.(2#0'.
A Company
R
INSTALLATION
INSTRUCTIONS
1. Before assembling this equipment, read the
enclosed INSTALLER INSTRUCTIONS in the
installation booklet; follow all the instructions
during installation.
2. Assemble parts as show in the ASSEMBLY
DRAWING. Refer to the assembly details for the
specific hardware required in each connection.
3.ALL NON-PATCHED HARDWARE
REQUIRES LOCTITE (SUPPLIED BY
OTHERS.)
4. DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED
AND LEVEL.
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
4'-6 1/16" [137.39 cm]
0'-5 5/16" [13.50 cm]
UP TO 2'-6"
DECK HEIGHTS
UP TO 4'-0"
DECK HEIGHTS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 974 of 1214 Page 1004 of 1692 91577
91580
91583
PAGE 2
ASSEMBLY VIEW
219049
219047
219050
Cudahy Park Renovation Project, Project # PRE-001 Document Control 975 of 1214 Page 1005 of 1692
DETAIL VIEW
91577 SHOWN OTHERS SIMILAR
STEP 1
4 PLACES
PAGE 3
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
STRUCTURE IS COMPLETELY ASSEMBLED AND LEVEL.
3/8" BARREL NUT
(804804)
1/2" FLAT WASHER
(817412)
3/8" x 1 3/4" HEX
HEAD BOLT (801006)
3/8" LOCK WASHER
(817334)
3/8" LOCK WASHER
(817334)
3/8" x 1" P.B.H.C.S.
w/PATCH (812050)
219047
K03861
Cudahy Park Renovation Project, Project # PRE-001 Document Control 976 of 1214 Page 1006 of 1692 PAGE 4
Parts List
DESCRIPTION 91577 91580 91583 PART NUMBER
AUTOMOTIVE RACE HALF PANEL ASSEMBLY 001 219047
ANIMAL RACE HALF PANEL ASSEMBLY 010 219049
SPACE RACE HALF PANEL ASSEMBLY 100 219050
TRU-LOC PANEL ATTACHMENT 444 K03861
111 219052
3/8" x 1" P.B.H.C.S. w/PATCH 444 812050*
3/8" x 1 3/4" HEX HEAD BOLT 444 801006*
3/8" LOCK WASHER 888 817334*
3/8" BARREL NUT 444 804804*
1/2" FLAT WASHER 444 817412*
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 977 of 1214 Page 1007 of 1692 R
+557'&4'8+5'&
ÄÄÄ
/1&'40
64#05('42.#6(14/
Y)7#4&4#+.
Ä4+5'
Ä4+5'
Ä4+5'
Ä4+5'
$&RPSDQ\
R
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
$66(0%/<9,(:
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
$
Cudahy Park Renovation Project, Project # PRE-001 Document Control 978 of 1214 Page 1008 of 1692 3$*(
7239,(:
>FP@
>FP@
>
FP@
>FP@
3/$19,(:
(;,67,1*
835,*+76
(/(9$7,219,(:
5(6,/,(17685)$&(
),1,6+('685)$&(
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>
FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 979 of 1214 Page 1009 of 1692 3$*(
>FP@
>FP@
>
FP@
>FP@
3/$19,(:
7239,(:
(;,67,1*
835,*+76
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17685)$&(
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>
FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 980 of 1214 Page 1010 of 1692 3$*(
>
FP@
>FP@
>FP@
>FP@
3/$19,(:
7239,(:
(;,67,1*
835,*+76
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17685)$&(
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 981 of 1214 Page 1011 of 1692 3$*(
>FP@
>
FP@
>FP@
>FP@
3/$19,(:
7239,(:
(;,67,1*
835,*+76
5(6,/,(17685)$&(
),1,6+('685)$&(
(/(9$7,219,(:
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
%5,&.25(48,9$/(17
6833/,('%<27+(56
>
FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 982 of 1214 Page 1012 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
)/$7:$6+(5
/2&.:$6+(5
[
3%+&6Z3$7&+
)/$7:$6+(5
/2&.:$6+(5
[
3%+&6Z3$7&+
'(7$,/9,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 983 of 1214 Page 1013 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
)/$7:$6+(5
/2&.:$6+(5
[
3%+&6Z3$7&+
)/$7:$6+(5
/2&.:$6+(5
[
3%+&6Z3$7&+
25 25
Cudahy Park Renovation Project, Project # PRE-001 Document Control 984 of 1214 Page 1014 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
[3%+&6
Z3$7&+
)/$7:$6+(5
2'
)/$7:$6+(5
2'
$&251187
Cudahy Park Renovation Project, Project # PRE-001 Document Control 985 of 1214 Page 1015 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
/2&.187
)/$7:$6+(5
2'
[3%+&6
Z3$7&+
)/$7:$6+(5
2'
Cudahy Park Renovation Project, Project # PRE-001 Document Control 986 of 1214 Page 1016 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
)/$7:$6+(5
2'
[3%+&6
Z3$7&+
)/$7:$6+(5
2'
/2&.187
Cudahy Park Renovation Project, Project # PRE-001 Document Control 987 of 1214 Page 1017 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
$
$/803,1
/2&.:$6+(5
[3%+&6
Z3$7&+
$
)/$7:$6+(5
2'
/2&.:$6+(5
[
3%+&6Z3$7&+
7187
25
25 127(
%2/76+28/'%(
72548(')520
)7/%6)25
3523(5,167$//7,21
Cudahy Park Renovation Project, Project # PRE-001 Document Control 988 of 1214 Page 1018 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
25 7187
)/$7:$6+(5
2'
/2&.:$6+(5
[3%+&6
Z3$7&+
Cudahy Park Renovation Project, Project # PRE-001 Document Control 989 of 1214 Page 1019 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
758/2& $
&2$7('3/$7)250
&2$7('67(3/,1.
&2$7('67(3/,1.
67(3$66(0%/<
67(3$66(0%/<
5,*+7*8$5'5$,/:(/'$66(0%/<
5,*+7*8$5'5$,/:(/'$66(0%/<
5,*+7*8$5'5$,/:(/'$66(0%/<
5,*+7*8$5'5$,/:(/'$66(0%/<
/()7*8$5'5$,/:(/'$66(0%/<
/()7*8$5'5$,/:(/'$66(0%/<
/()7*8$5'5$,/:(/'$66(0%/<
/()7*8$5'5$,/:(/'$66(0%/<
3/$7)2506833257:(/'$66(0%/<
+$1'6833257:(/'$66(0%/<
+$1'6833257:(/'$66(0%/<
5$036833257
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
)/$7:$6+(5
2'
/2&.:$6+(5
7187
$&251187
$/803,1
/2&.187
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 990 of 1214 Page 1020 of 1692 R
+557'&4'8+5'&
ÄÄÄ
/1&'40
64#05('42.#6(14/
Y$#44+'4
Ä4+5'
Ä4+5'
Ä4+5'
Ä4+5'
$&RPSDQ\
Ä4+5'
R
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
;'#451.&
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF UO 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
$
$66(0%/<9,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 991 of 1214 Page 1021 of 1692 3$*(
>FP@
>FP@
7239,(:
(;,67,1*
835,*+76
>FP@
>
FP@
3/$19,(:
(/(9$7,219,(:
),1,6+('685)$&(
5(6,/,(17685)$&(
>FP@
>FP@
%5,&.25(48,9$/(17
6833/,('%<27+(56
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>
FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 992 of 1214 Page 1022 of 1692 3$*(
>
FP@
>FP@
7239,(:
(;,67,1*
835,*+76
>FP@
>FP@
3/$19,(:
(/(9$7,219,(:
%5,&.25(48,9$/(17
6833/,('%<27+(56
5(6,/,(17685)$&(
),1,6+('685)$&(
>FP@
>FP@
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>
FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 993 of 1214 Page 1023 of 1692 3$*(
7239,(:
(;,67,1*
835,*+76
3/$19,(:
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
>
FP@
>FP@
>FP@
>FP@
(/(9$7,219,(:
%5,&.25(48,9$/(17
6833/,('%<27+(56
5(6,/,(17685)$&(
),1,6+('685)$&(
>FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 994 of 1214 Page 1024 of 1692 3$*(
>FP@
>FP@
7239,(:
(;,67,1*
835,*+76
>
FP@
>FP@
3/$19,(:
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
5(6,/,(17685)$&(
),1,6+('685)$&(
%5,&.25(48,9$/(17
6833/,('%<27+(56
(/(9$7,219,(:
>
FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 995 of 1214 Page 1025 of 1692 3$*(
3/$19,(:
(;,67,1*
835,*+76
7239,(:
>
FP@
>FP@
>FP@
>FP@
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
),1,6+('685)$&(
5(6,/,(17685)$&(
(/(9$7,219,(:
%5,&.25(48,9$/(17
6833/,('%<27+(56
>FP@
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
>FP@
>FP@
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 996 of 1214 Page 1026 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
/2&.:$6+(5
)/$7:$6+(5
[
3%+&6Z3$7&+
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
[
3%+&6Z3$7&+
/2&.:$6+(5
)/$7:$6+(5
Cudahy Park Renovation Project, Project # PRE-001 Document Control 997 of 1214 Page 1027 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
)/$7:$6+(5
/2&.:$6+(5
[
3%+&6Z3$7&+
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
)/$7:$6+(5
/2&.:$6+(5
[
3%+&6Z3$7&+
25 25
Cudahy Park Renovation Project, Project # PRE-001 Document Control 998 of 1214 Page 1028 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
[3%+&6
Z3$7&+
)/$7:$6+(5
2'
)/$7:$6+(5
2'
$&251187
Cudahy Park Renovation Project, Project # PRE-001 Document Control 999 of 1214 Page 1029 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
/2&.187
)/$7:$6+(5
2'
[3%+&6
Z3$7&+
)/$7:$6+(5
2'
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1000 of 1214 Page 1030 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
)/$7:$6+(5
2'
[3%+&6
Z3$7&+
/2&.187
)/$7:$6+(5
2'
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1001 of 1214 Page 1031 of 1692 67(3
3/$&(6
67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
$/803,1
/2&.:$6+(5
[3%+&6
Z3$7&+
$
$
25
)/$7:$6+(5
2'
/2&.:$6+(5
[
3%+&6Z3$7&+
7187
25 127(
%2/76+28/'%(
72548(')520
)7/%6)25
3523(5,167$//7,21
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1002 of 1214 Page 1032 of 1692 67(3
3/$&(6
3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
25 7187
)/$7:$6+(5
2'
/2&.:$6+(5
[3%+&6
Z3$7&+
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1003 of 1214 Page 1033 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
758/2& $
&2$7('3/$7)250
&2$7('67(3/,1.
&2$7('67(3/,1.
67(3$66(0%/<
67(3$66(0%/<
381&+('67(3
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
5,*+7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
/()7%$55,(5:(/'$66(0%/<
3/$7)2506833257:(/'$66(0%/<
+$1'6833257:(/'$66(0%/<
+$1'6833257:(/'$66(0%/<
5$036833257
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
[3%+&6Z3$7&+
)/$7:$6+(5
)/$7:$6+(5
2'
/2&.:$6+(5
7187
$&251187
$/803,1
/2&.187
HARDWARE COMPLETE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1004 of 1214 Page 1034 of 1692 3$*(
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW Cudahy Park Renovation Project, Project # PRE-001 Document Control 1005 of 1214 Page 1035 of 1692 R
+557'&4'8+5'&
ÄÄÄ
%#6#.+0#
%.+/$'4
%#6#.+0#%.+/$'4$#5'
%#6#.+0#%.+/$'4%#2
%#6#.+0#%.+/$'4Ä4+5'4
%#6#.+0#%.+/$'4Ä4+5'4
$&RPSDQ\
R
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
5()(572<28581,77239,(:
)25&$7$/,1$&/,0%(5
&21),*85$7,21
$66(0%/<9,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1006 of 1214 Page 1036 of 1692 3$*(
$66(0%/<9,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1007 of 1214 Page 1037 of 1692 3$*(
$66(0%/<9,(:
5()(5723$*(6$1'
$66(0%/<9,(:
5()(5723$*(6$1'
$66(0%/<9,(:
5()(5723$*(6$1'
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1008 of 1214 Page 1038 of 1692 3$*(
7239,(:6
>FP@
>
FP@
>FP@
>
FP@
>FP@
>
FP@
>
FP@
>
FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1009 of 1214 Page 1039 of 1692 3$*(
>FP@
>FP@
>FP@
7<3
>FP@
7<3
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
3/$19,(:
6+2:1
&21&5(7(5(48,5('
&8%,&<$5'6
>&8%,&0(7(56@
>FP@
>FP@
>
FP@
>
FP@
>FP@
5(6,/,(17685)$&(
),1,6+('685)$&(
3('(67$/
5()(5723$*(6
$1'
3('(67$/
5()(5723$*(6
$1'
3('(67$/
5()(5723$*(6
$1'
(/(9$7,219,(:
6+2:1
%5,&.25(48,9$/(17
6833/,('%<27+(56
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1010 of 1214 Page 1040 of 1692 3$*(
>FP@
7<3
>FP@
7<3
>FP@
7<3
>
FP@
7<3
P
>PFP@',$0(7(5[
>FP@'((3
5(4
'
(;,67,1*
835,*+76
127(
+2/('(37+6,1',&$7('21
$//3/$19,(:6$5(0($685('
)5207+(),1,6+('685)$&(6((
(/(9$7,219,(:$//)227,1*
',0(16,216$5(%$6('21/(9(/
),1,6+('685)$&(
3/$19,(:
5()(572<285
81,77239,(:)25
&$7$/,1$&/,0%(5
&21),*85$7,21
>FP@
>FP@
5(6,/,(17685)$&(
),1,6+('685)$&(
%5,&.25(48,9$/(17
6833/,('%<27+(56
(/(9$7,219,(:
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1011 of 1214 Page 1041 of 1692 3$*(
>FP@
>
FP@
>FP@
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1012 of 1214 Page 1042 of 1692 3$*(
>FP@
>
FP@
>FP@
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1013 of 1214 Page 1043 of 1692 3$*(
>FP@
>FP@
>FP@
>
FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
&$3
3('(67$/
'(&.+(,*+7
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1014 of 1214 Page 1044 of 1692 3$*(
>FP@
>
FP@
>FP@
>FP@
>
FP@
>
FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1015 of 1214 Page 1045 of 1692 3$*(
>FP@
>
FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
>
FP@
>
FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1016 of 1214 Page 1046 of 1692 3$*(
>
FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1017 of 1214 Page 1047 of 1692 3$*(
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1018 of 1214 Page 1048 of 1692 3$*(
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
>FP@
>
FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
>FP@
>FP@
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1019 of 1214 Page 1049 of 1692 3$*(
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
>FP@
>FP@
)$&(2)'(&.
72&/,0%(5
0,1
>FP@
0$;
>FP@
23(1,1*0867%(
*5($7(57+$1
>FP@
$1'/(667+$1
>FP@
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
(/(9$7,219,(:
5,6(5
3('(67$/
'(&.+(,*+7
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
;'#451.&
%*+.&4'0
6JKURNC[GSWKROGPV
KUFGUKIPGFHQT
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF 'PTKEJKPI%JKNFJQQF6JTQWIJ2NC[
YYYICOGVKOGEQO
UO
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1020 of 1214 Page 1050 of 1692 3$*(
>FP@
9$5,(6
5()(57229(5$//
6+2&.$%625%,1*
0$7(5,$/
>FP@
0$;
`0,1
&21&5(7(
%5,&.25
(48,9$/(17
6+2&.$%625%,1*3523(57,(62)685)$&,1*
0$7(5,$/69$5<,)<28'(7(50,1(7+$7/(66
7+$1
>FP@2)685)$&,1*,65(48,5('
0$.(837+(',))(5(1&(,1(/(9$7,21:,7+
($57+%()25($33/<,1*685)$&,1*
$
%
81,7*5281'3/$1
>FP@
>FP@
>FP@
>FP@
>FP@
>
FP@
>FP@
3,3(6,=(
',$$
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
>FP@
)227,1*6,=(
',$%
68**(67('0,1,080&21&5(7(
2)(8523($167$1'$5'(121/<
6/23(')227,1*,6$5(48,5(0(17
5$7,1*
36,
127(6
%5,&.25
',0(16,21('
727232)
($57+
(48,9$/(17
)227,1*'(7$,/
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1021 of 1214 Page 1051 of 1692 3$*(
,03257$17352'8&7,1)250$7,21
$1'6$)(7<:$51,1*6
$OOHTXLSPHQWVKRXOGEHLQVWDOOHGRQDVRIWUHVLOLHQWHQHUJ\DEVRUELQJJURXQGVXUIDFH1(9(5,167$//3/$< (48,30(1721&21&5(7(25$63+$/7$IDOORQDKDUGVXUIDFHFDQUHVXOWLQVHULRXVLQMXU\WRWKHHTXLSPHQWXVHU $/:$<6)2//2:,167$//$7,21,16758&7,216:+(1(5(&7,1*(48,30(17 :RUQVXUIDFHVDURXQGHTXLSPHQWVKRXOGEHUHVWRUHG&RQFUHWHIRRWLQJVVKRXOGQHYHUEHH[SRVHG6XUIDFHGHSWKVKRXOG FRPSO\ZLWKLQVWDOODWLRQLQVWUXFWLRQV
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
6),/(6)25$&&85$7(5()(5(1&(:+(1
5(3/$&(0(173$576$5(1(('('
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
&KHFNWREHVXUHDOOILWWLQJVDUHWLJKWDQGWKDWWKHEDUVDQGSLSHVGRQRWPRYH $VRIWUHVLOLHQWVXUIDFHVKRXOGEHSODFHGXQGHUDOOVZLQJVH[WHQGLQJDWOHDVWVL[IHHWEH\RQGWKHIDUWKHVWDUFRIWKHVZLQJ VHDWERWKIURQDQGEDFN1(9(5,167$//3/$<(48,30(1721&21&5(7(25$63+$/7 6723 6723
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1022 of 1214 Page 1052 of 1692 3$*(
,167$//$7,21,16758&7,216
127(
7+,6,167$//$7,21%22./(76+28/'%(.(37,1&86720(5
6),/()25)8785(5()(5(1&(
127(
'RQRWRYHUWLJKWHQEROWV7RRYHUWLJKWHQPD\FDXVHEXFNOLQJRUGLPSOLQJRIVRPHSDUWV 127(
5HDGLQVWDOODWLRQLQVWUXFWLRQVWKRURXJKO\EHIRUHVWDUWLQJDVVHPEO\3RXUFRQFUHWHRQO\DIWHUILQDODVVHPEO\LVFRPSOHWH %UDFLQJPDWHULDOPD\EHUHTXLUHGGXULQJDVVHPEO\
127(
'RQRWWLJKWHQDQ\QXWVEROWVURGVHWFXQWLOWKHXQLWLVFRPSOHWHO\DVVHPEOHG 127(
$VVHPEO\DQGOHYHOLQJWLPHZLOOEHJUHDWO\UHGXFHGLIDWUDQVLWLVXVHGWRVHWORFDWLRQDQGGHSWKRIJURXQGKROHV 127(
'XHWRH[WUHPHVLQZHDWKHUDQGVRLOFRQGLWLRQVKROHVL]HVPD\KDYHWREHLQFUHDVHGWRPHHWORFDOFRQGLWLRQV 127(
5HIHUWR'HWDLO9LHZVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQHDFKFRQQHFWLRQ 127(
'21273285&21&5(7(817,/(17,5(6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/ 127(
5()(572<28581,77239,(:)25&$7$/,1$&/,0%(5&21),*85$7,21 67(3
21/<
$WWDFK)RRWEXFN:HOG$VVHPEOLHVWRWKHERWWRPRIWKH&DWDOLQD&OLPEHU%DVH5()(5723$*(
67(3
$WWDFK0RXQWLQJ3ODWH:HOG$VVHPEOLHVWRWKHWRSRIWKH&DWDOLQD&OLPEHU%DVH5()(5723$*( 67(3
6HFXUH0RXQWLQJ3ODWH:HOG$VVHPEOLHVWR)RRWEXFN:HOG$VVHPEOLHV127( 8VLQJ0RXQWLQJ3ODWH:HOG$VVHPEO\DVD
WHPSODWHGULOOGLDPHWHUKROHVLQ)RRWEXFN:HOG$VVHPEO\5()(5723$*( 67(3
$WWDFK&DWDOLQD&OLPEHU&DS
5LVHURU
5LVHUWR0RXQWLQJ3ODWH:HOG$VVHPEOLHV5()(5723$*( 67(3
21/<
6HFXUH&DWDOLQD&OLPEHU
5LVHUWR0RXQWLQJ3ODWH:HOG$VVHPEO\
127(
8VLQJ6WHS(OHYDWLRQ
9LHZDVDWHPSODWHGULOOGLDPHWHUKROHLQ0RXQWLQJ3ODWH:HOG$VVHPEO\
5()(5723$*(
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1023 of 1214 Page 1053 of 1692 3$*(
,1&+
&0
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
'(7$,/9,(:
21/<
[
3%+&6Z3$7&+
)/$7:$6+(5
2'
9,(:,6)520
81'(51($7+
67(3
3/$&(6
7+,667(3,6)25
21/<
5()(572
3$*(6$1')25
25 (/(9$7,219,(:
25 Cudahy Park Renovation Project, Project # PRE-001 Document Control 1024 of 1214 Page 1054 of 1692 3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
25 25
67(3
3/$&(6
3/$&(6
3/$&(6
67(3
3/$&(6
3/$&(6
3/$&(6
5()(572
3$*(6)25
'(&.+(,*+7
(/(9$7,219,(:6
25 25
25 25
)/$7:$6+(5
2'
[
3%+&6Z3$7&+
[6(/)
7$33,1*725;
Z3$7&+
+:6
86,1*02817,1*3/$7(
:(/'$66(0%/<$6$
7(03/$7('5,//
',$0(7(5+2/(6,1
)227%8&.:(/'$66(0%/<
5()(572<285
81,77239,(:)25
&$7$/,1$&/,0%(5
&21),*85$7,21
$66(0%/<6+2:1
,6)25&211(&7,21
385326(621/<
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1025 of 1214 Page 1055 of 1692 3$*(
,1&+
&0
'(7$,/9,(:
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
)/$7:$6+(5
2'
[
3%+&6Z3$7&+
9,(:,6)520
81'(51($7+
25 25
25 25
67(3
3/$&(6
3/$&(6
3/$&(6
5()(572
3$*(6)25
'(&.+(,*+7
(/(9$7,219,(:6
5()(572<285
81,77239,(:)25
&$7$/,1$&/,0%(5
&21),*85$7,21
$66(0%/<6+2:1
,6)25&211(&7,21
385326(621/<
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1026 of 1214 Page 1056 of 1692 3$*(
,1&+
&0
'(7$,/9,(:
21/<
127(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('$1'/(9(/
)/$7:$6+(5
2'
[6(/)
7$33,1*725;
Z3$7&+
+:6
67(3
>FP@
67(3
(/(9$7,219,(:
7232)&$7$/,1$
&/,0%(5
5,6(5
7+,667(3,6)25
21/<
5()(572
3$*(6$1'
)25(/(9$7,219,(:6
86,1*(/(9$7,219,(:
%(/2:$6$7(03/$7(
'5,//',$0(7(5
+2/(,1&$7$/,1$&/,0%(5
5,6(5$1'02817,1*
3/$7(:(/'$66(0%/<
6(&7,212)
:$65(029(')25
&/$5,7<21/<
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1027 of 1214 Page 1057 of 1692 3$*(
3DUWV/LVW
'(6&5,37,21
3$57180%(5
&$7$/,1$&/,0%(5%$6(
&$7$/,1$&/,0%(5&$3
&$7$/,1$&/,0%(5
5,6(5
&$7$/,1$&/,0%(5
5,6(5
6+257)227%8&.:(/'$66(0%/<
0(',80)227%8&.:(/'$66(0%/<
7$//)227%8&.:(/'$66(0%/<
02817,1*3/$7(:(/'$66(0%/<
02817,1*3/$7(:(/'$66(0%/<
[6(/)7$33,1*725;Z3$7&+ +:6
[6(/)7$33,1*725;Z3$7&+ +:6
[3%+&6Z3$7&+
)/$7:$6+(5
2'
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware. 7RUHGXFHWKHULVNRIFORWKLQJHQWDQJOHPHQWLQFRPSOLDQFHZLWK$670)DQ\EROW HQGSURWUXGLQJPRUHWKDWWZRIXOOWKUHDGVEH\RQGWKHIDFHRIWKHQXWVKDOOEHFXWRII IOXVKILOHGVPRRWKDQGWUHDWHGWRSUHYHQWFRUURVLRQ
MAINTENANCE PROCEDURE:
3HULRGLFDOO\FKHFNKDUGZDUHIRUWLJKWQHVVDQGWLJKWHQDVQHFHVVDU\ $OZD\VFKHFNDOOSDUWVIRUEUHDNDJHRUZHDUDQGLPPHGLDWHO\SXWHTXLSPHQWRXWRIVHUYLFHXQWLODQ\IDXOW\SDUWVIRXQGDUHUHSDLUHG RUUHSODFHG
&KHFNDOOPHWDOSDUWVIRUUXVWSDLQWORVVDQGWRXFKXSLIQHFHVVDU\ZLWKSDLQW &KHFNIRUZHOGHGDUHDVDQGYHULI\LQWHJULW\
&KHFNSHULRGLFDOO\UHVLOLHQWVXUIDFLQJIRUDSSURSULDWHGHSWKDQGUHPRYHH[WUDQHRXVPDWHULDOVWKDWFRXOGFDXVHLQMXU\LQIHFWLRQ RUGLVHDVH
0DLQWDLQGHWDLOHGLQVWDOODWLRQLQVSHFWLRQPDLQWHQDQFHDQGUHSDLUUHFRUGVIRUHDFKSXEOLFXVHSOD\JURXQGHTXLSPHQW
HARDWARE COMPLETE
HARDWARE COMPLETE
HARDWARE COMPLETE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1028 of 1214 Page 1058 of 1692 R
+557'&4'8+5'&
ÄÄÄ
*':
%#012; $&RPSDQ\ R
>FP@
7KH&36&UHFRPPHQGVDJHVHSDUDWLRQRQ
SOD\JURXQGV6XSHUYLVHFKLOGUHQWRHQVXUH
VHSDUDWLRQEHWZHHQWRSUHVFKRROHUVDQGWR
\HDUROGVFKRRODJHGFKLOGUHQ
7KLVSOD\HTXLSPHQWLV
GHVLJQHGIRUFKLOGUHQDJH
#FWNVUWRGTXKUKQP
KUTGEQOOGPFGF
,167$//$7,21
,16758&7,216
%HIRUHDVVHPEOLQJWKLVHTXLSPHQWUHDGWKH
HQFORVHG,167$//(5,16758&7,216LQWKH
LQVWDOODWLRQERRNOHW
IROORZDOOWKHLQVWUXFWLRQV
GXULQJLQVWDOODWLRQ
$VVHPEOHSDUWVDVVKRZQLQWKH
$66(0%/<'5$:,1*5HIHUWRWKHDVVHPEO\
GHWDLOVIRUWKHVSHFLILFKDUGZDUHUHTXLUHGLQ
HDFKFRQQHFWLRQ
/2&7,7(
6833/,('%<27+(56
6+28/'%(86('21$//7+5($'('
+$5':$5(
'21273285&21&5(7(817,/(17,5(
6758&785(,6&203/(7(/<$66(0%/('
$1'/(9(/
$66(0%/<9,(:
),1,6+('685)$&(
,1*5281'
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1029 of 1214 Page 1059 of 1692 2 PAGE
222584
222584
222584
222584
222824
222829
222584
222584
FINISHED SURFACE
222833
222829
222833
223115
223115
223115
222833
222824
222829
222586
222829
222833
222824
222829
222824
222833
222829
FRAME ASSEMBLY VIEW
222824
3'-6" [106.68 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1030 of 1214 Page 1060 of 1692 3 PAGE
2'- 1/2" [62.23 cm]
TYP
6'-1 1/2" [186.69 cm]
TYP
8'-2" [248.92 cm]
3'-6 7/16" [107.79 cm]
TYP
7'- 7/8" [215.57 cm]
TYP
4'-1" [124.46 cm]
TYP
P1'-6" [P45.72 cm]
DIAMETER x
3'-6" [106.68 cm] DEEP
(6 REQ'D)
PLAN VIEW
NOTE: HOLE DEPTHS INDICATED ON
ALL PLAN VIEWS ARE MEASURED
FROM THE FINISHED SURFACE. SEE
ELEVATION VIEW. ALL FOOTING
DIMENSIONS ARE MEASURED ON LEVEL
FINISHED SURFACE.
CONCRETE REQUIRED:
0.98 CUBIC YARDS
[0.75 CUBIC METERS]
TOP VIEW
23'-2 11/16" [707.90 cm]
26'-8 13/16" [814.93 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1031 of 1214 Page 1061 of 1692 4 PAGE
26'-0" [792.45 cm]
ANCHOR RODS
FINISHED SURFACE
RESILIENT SURFACING
223115
ELEVATION VIEW
2'-6" [76.20 cm]
3'-6" [106.68 cm]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1032 of 1214 Page 1062 of 1692 5 PAGE
FOOTING DETAIL
1'-0" [30.48 cm]
VARIES
(REFER TO OVERALL
SHOCK ABSORBING
MATERIAL
3.9" [10.00 cm]
MAX.
45` MIN.
CONCRETE
BRICK OR
EQUIVALENT
SHOCK ABSORBING PROPERTIES OF SURFACING
MATERIALS VARY. IF YOU DETERMINE THAT LESS
THAN 1'-0" [30.48cm] OF SURFACING IS REQUIRED,
MAKE UP THE DIFFERENCE IN ELEVATION WITH
EARTH, BEFORE APPLYING SURFACING.
"A"
"B"
UNIT GROUND PLAN)
1 1/16" [2.70 cm]
1 5/16" [3.33 cm]
1 5/8" [4.13 cm]
1 7/8" [4.83 cm]
2 3/8" [6.03 cm]
3 1/2" [8.89 cm]
5" [12.70 cm]
(PIPE SIZE)
DIA. "A"
1'-2" [35.56 cm]
1'-6" [45.72 cm]
1'-6" [45.72cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
1'-2" [35.56 cm]
(FOOTING SIZE)
DIA. "B"
-SUGGESTED MINIMUM CONCRETE
OF EUROPEAN STANDARD EN1176-1 ONLY
-SLOPED FOOTING IS A REQUIREMENT
RATING: 3000 PSI
NOTES:
BRICK OR
DIMENSIONED
TO TOP OF
EARTH
EQUIVALENT
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1033 of 1214 Page 1063 of 1692 STEP 1
12 PLACES
STEP 2
6 PLACES
6 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
1/2" ANCHOR ROD
(135038)
223115
223115 223115
223115
1/2" LOCKWASHER
(817342)
1/2" x 5 1/2" HEX
HEAD BOLT (801221)
223115
1/2" LOCKNUT
(804355)
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
FRAME IS COMPLETELY ASSEMBLED AND LEVEL.
SHADE WILL BE INSTALLED AFTER CONCRETE
HAS CURED APPROXIMATELY 48 HOURS.
DETAIL VIEW
EXISTING
UPRIGHT
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1034 of 1214 Page 1064 of 1692 STEP 3
6 PLACES
STEP 4
12 PLACES
7 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
EXISTING
UPRIGHT
222824
DO NOT ATTACH
UNTIL STEP 8
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
FRAME IS COMPLETELY ASSEMBLED AND LEVEL.
SHADE WILL BE INSTALLED AFTER CONCRETE
HAS CURED APPROXIMATELY 48 HOURS.
DETAIL VIEW
222824
222824
222824
222824
222824
222584
222584
222829
222829
222829
222584
222829
222584
222584
222829
222824
222584
222829
1/4" x 1" SELF
TAPPING TORX
w/PATCH (HWS0021)
222829
222584
USING RAFTER AS A
TEMPLATE, DRILL
Ø3/16" DIAMETER HOLES
IN GLIDE EXTENSION
NOTE: ORIENTATION OF HOOK
ON GLIDE EXTENSION IS CRITICAL.
180° FROM
SOCKET
90° FROM
PILOT HOLE
NOTE: ORIENTATION OF HOOK
ON GLIDE EXTENSION IS CRITICAL.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1035 of 1214 Page 1065 of 1692 STEP 5
12 PLACES
STEP 6
6 PLACES
8 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
1/4" x 1" SELF
TAPPING TORX
w/PATCH (HWS0021)
USING HUB AS A
TEMPLATE, DRILL
Ø3/16" DIAMETER
HOLES IN RAFTER
222586
222829
3/8" x 3 1/2" HEX
HEAD BOLT (801013)
3/8" HEX NUT NC
NYLOCK SS (804380)
222829
222824
USING RAFTER AS A
TEMPLATE, DRILL
Ø7/16" DIAMETER
HOLES IN EXTENSION
222829
222824
222824
222829
222829
222829
222829
222824
222824
222829
222824
222824
222586
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
FRAME IS COMPLETELY ASSEMBLED AND LEVEL.
SHADE WILL BE INSTALLED AFTER CONCRETE
HAS CURED APPROXIMATELY 48 HOURS.
DETAIL VIEW
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1036 of 1214 Page 1066 of 1692 STEP 8
24 PLACES
STEP 7
12 PLACES
9 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
EXISTING
UPRIGHT
3/8" x 1 1/4" SELF
TAPPING TORX
w/PATCH (HWS0081) 222824
USING EXTENSION AS A
TEMPLATE, DRILL
Ø5/16" DIAMETER
HOLES IN UPRIGHT
222824
222824
222824
222824
222824
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE
FRAME IS COMPLETELY ASSEMBLED AND LEVEL.
SHADE WILL BE INSTALLED AFTER CONCRETE
HAS CURED APPROXIMATELY 48 HOURS.
DETAIL VIEW
1/2" LOCKNUT
(804355)
1/2" LOCKWASHER
(817342)
1/2" FLAT WASHER
(817412)
1/2" x 1 1/2" HEX
HEAD BOLT (801205)
1/2" FLAT WASHER
(817412)
222833
222829
222824
OR
222833
222833
222829
222829
222829
222833
222833
222829
222833
222833
222829
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1037 of 1214 Page 1067 of 1692 10 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
SECTION OF FABRIC
HAS BEEN REMOVED
TO SHOW CABLE
FOR CLARITY ONLY
CABLE WILL EXIT
END OF SLEEVE
IN FABRIC
SECURE FABRIC AND CABLE
OVER GLIDE HOOKS ON
GLIDE EXTENSIONS
222835
222584
CABLE WILL EXIT FROM
JUMP-OUT HOLE LOCATED
UNDER STRAP. EXCESS
CABLE WILL TUCK INTO
SAME HOLE.
SECURE FABRIC AND CABLE
OVER GLIDE HOOK ON
GLIDE EXTENSION.
CABLE MUST PASS
UNDER GLIDE HOOK.
CABLE CLAMP
222835
222584
NOTE: ADD LOCTITE (SUPPLIED BY
OTHERS) TO BOLTED CONNECTIONS.
NOTE: CABLE CLAMP MUST BE
INSTALLED WITH NUTS FACING DOWN.
CLAMPS MUST BE TOUCHING EACH OTHER.
NOTE: ANY BOLT END PROTRUDING MORE
THAN TWO FULL THREADS BEYOND FACE
OF THE NUT PROMPTLY CUT-OFF FLUSH,
FILE SMOOTH, AND TREAT TO PREVENT
CORROSION.
VIEW IS FROM TOP
OF SHADE FABRIC
STEP 9
5 PLACES
STEP 10
NOTE: FOLLOWING STEPS TO BE COMPLETED AFTER
CONCRETE HAS CURED APPROXIMATELY 48 HOURS.
DETAIL VIEW
VIEW IS FROM TOP
OF SHADE FABRIC
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1038 of 1214 Page 1068 of 1692 11 PAGE
13 0 INCH 1 2 3 4 5 6
0 CM 1 2 3 4 5 6 7 8 9 10 1211 14 15
COVER PLATE
*DRAIN PORT AT BOTTOM
3/8" WASHER
3/8" BOLT
222584
HARDWARE INCLUDED IN
GLIDE EXTENSION (222584)
REMOVE COVER PLATE
TO ACCESS TENSIONING NUT
NOTE: FOLLOWING STEPS TO BE COMPLETED AFTER
CONCRETE HAS CURED APPROXIMATELY 48 HOURS.
DETAIL VIEW
222584
222584
222584
222584
222584
222584
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1039 of 1214 Page 1069 of 1692 12 PAGE
INSTALLATION INSTRUCTIONS
NOTE: THIS INSTALLATION BOOKLET SHOULD BE KEPT IN CUSTOMER'S FILE FOR FUTURE REFERENCE.
NOTE: Do not overtighten bolts. To overtighten may cause buckling or dimpling of some parts.
NOTE: Read installation instructions thoroughly before starting assembly. Pour concrete only after final assembly is complete.
Bracing material may be required during assembly.
NOTE: Do not tighten any nuts, bolts, rods, etc. until the unit is completely assembled.
NOTE: Assembly and leveling time will be greatly reduced if a transit is used to set location and depth of ground holes.
NOTE: Due to extremes in weather and soil conditions, hole sizes may have to be increased to meet local conditions NOTE: Refer to the Detail Views for the specific hardware required in each connection.
NOTE: DO NOT POUR CONCRETE UNTIL ENTIRE FRAME IS COMPLETELY ASSEMBLED AND LEVEL. SHADE WILL BE INSTALLED AFTER CONCRETE HAS CURED APPROXIMATELY 48 HOURS.
STEP 1: Attach Anchor Rods to In-Ground Extensions. REFER TO PAGE 6.
STEP 2: Attach In-Ground Extensions to Uprights. REFER TO PAGE 6.
STEP 3: Insert Extension Weld Assemblies over Uprights NOTE: Do not attach until Step 8. REFER TO PAGE 7.
STEP 4: Attach Glide Extensions to Rafter Weld Assemblies. NOTE: Orientation of Hook on Glide Extension is critical. Using Rafter Weld Assembly as a template, drill Ø3/16" diameter holes in Glide Extension. REFER TO PAGE 7.
STEP 5: Attach Rafter Weld Assemblies to Square Hub Weld Assembly. NOTE: Using Square Hub Weld Assembly as a template, drill Ø3/16" diameter holes in Rafter Weld Assembly. REFER TO PAGE 8.
STEP 6: Attach Rafter Weld Assemblies to Extension Weld Assemblies. NOTE: Using Rafter Weld Assembly as a template, drill Ø7/16" diameter holes in Extension Weld Assembly. REFER TO PAGE 8.
STEP 7: Attach Strut Weld Assembly to Rafter Weld Assemblies and Extension Weld Assemblies. REFER TO PAGE 9.
STEP 8: Secure Extension Weld Assemblies to Uprights. NOTE: Using Extension Weld Assembly as a template, drill Ø5/16" diameter holes in Upright. REFER TO PAGE 9.
NOTE: FOLLOWING STEPS TO BE COMPLETED AFTER CONCRETE HAS CURED APPROXIMATELY 48 HOURS.
STEP 9: Starting at any corner thread the steel cable through the jump-out hole under loop at the edge of the shade fabric until it comes out the end of the sleeve at the next corner. Continue threading cable through sleeve all the way around the shade fabric until the entire shade fabric has been encircled. Cable will exit through jump-out hole on the same corner it was started. Leave a loop of approximately 9 inches at each corner. Spread the shade fabric over the frame and secure corners to the hooks on the Glide Extensions. It may be necessary to flap the loose corners up and down to stretch the shade fabric so that it fits over the hooks on the Glide Extensions. NOTE: The Steel Cable must always pass under the hooks on the Glide Extensions. REFER TO PAGE 10.
STEP 10: Pull tight by hand then using the clamps provided, fasten the steel cables together. All clamps must be used. After clamps are tightened, thread the excess steel cable back into the jump-out holes in the shade fabric. Any bolt end protruding more than two full threads beyond face of the nut promptly cut-off flush, file smooth, and treat to prevent corrosion. NOTE: If any portion of the steel cable was bent/kinked during the tensioning process, it must be straightened by bending the steel cable back in the opposite direction of the bend. REFER TO PAGE 10.
STEP 11: Remove Cover Plate from Glide Extension to access tensioning nut. Take turns tensioning each Glide Extension in small increments. Make sure that the steel cables cross each other at the corner where the steel cable ends. DO NOT OVER TENSION! You can test the tightness of the shade fabric by hitting the perimeter steel cable with the palm of your hand to see how much it moves. If the shade fabric does not move more than 6" up or down then you have the correct tension. If the shade fabric bounces and has a ripple affect then you may need to apply more tension. Attach Cover Plate to Glide Extension. REFER TO PAGE 11.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1040 of 1214 Page 1070 of 1692 Parts List
DESCRIPTION QTY PART NUMBER
HEX HUB WELD ASSEMBLY 1 222586
HEX EXTENSION 26' WELD ASSEMBLY 6 222824
HEX RAFTER 26' WELD ASSEMBLY 6 222829
HEX STRUT 26' WELD ASSEMBLY 6 222833
GLIDE EXTENSION 6 222584
IN-GROUND EXTENSION 6 223115
1 222835
26' HEX SHADE FABRIC 1 **
1/4" CABLE, 80'-0" LG 1 **
CABLE CLAMP 1 **
1 222836
1/4" x 1" SELF TAPPING TORX w/PATCH 24 HWS0021*
3/8" x 1 1/4" SELF TAPPING TORX w/PATCH 24 HWS0081*
3/8" x 3 1/2" HEX HEAD BOLT 6 801013*
3/8" HEX NUT NC NYLOCK SS 6 804380*
1/2" x 1 1/2" HEX HEAD BOLT 12 801205*
1/2" x 5 1/2" HEX HEAD BOLT 6 801221*
1/2" FLAT WASHER 24 817412*
1/2" LOCKWASHER 18 817342*
1/2" LOCKNUT 18 804355*
1/2" ANCHOR ROD 12 135038*
13 PAGE
HARDWARE COMPLETE
26' HEX FABRIC PACKAGE
* Included in Hardware
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store Unused Parts Appropriately Until Assembly Is Completed.
Once Assembly Is Completed, Remove Any Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location.
Unless Otherwise Specified, All Units of Measure are Each Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
To reduce the risk of clothing entanglement in compliance with ASTM F1487, any bolt end protruding more that two full threads beyond the face of the nut shall be cut-off flush, filed smooth and treated to prevent corrosion.
** Included in 26' Hex Fabric Package
MAINTENANCE PROCEDURE:
- Periodically check hardware for tightness, and tighten as necessary. - Always check all parts for breakage or wear, and immediately put equipment out of service until any faulty parts found are repaired or replaced.
- Check all metal parts for rust, paint loss and touch-up if necessary with paint. - Check for welded areas and verify integrity.
- Check periodically resilient surfacing for appropriate depth and remove extraneous materials that could cause injury, infection, or disease.
- Maintain detailed installation, inspection, maintenance, and repair records for each public-use playground equipment.
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1041 of 1214 Page 1071 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 1042 of 1214 Page 1072 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 1043 of 1214
8.2 SPLASH PAD EQUIPMENT
CT
AWSP-1
SPLASH PAD COLLECTOR TANK RESERVOIR
SCALE: 1/2" T0 1'
NOTES:
1. PLUMBING - ALL PIPE & FITTINGS SHALL BE SCHEDULE 40 PVC PER ASTM D1785 AND N.S.F. APPROVED AND STAMPED FOR POTABLE WATER APPLICATIONS. JOINTS TO BE SOLVENT WELDED PER ASTM D2855. ALL PLUMBING AND MATERIALS TO CONFORM TO LOCAL BUILDING CODE LATEST EDITION.2. ELECTRICAL - ALL ELECTRICAL EQUIPMENT WIRING, INSTALLATION AND GROUNDING OF POOL COMPONENTS SHALL CONFORM TO NATIONAL FIRE PROTECTION ASSOC. 70, NATIONAL ELECTRICAL CODE (N.E.C.) LATEST EDITION AND ALL APPLICABLE LOCAL CODES. CHEMICAL FEED PUMPS TO BE INTERLOCKED WITH THE RECIRCULATION PUMP.3. EQUIPMENT - ALL PUMPS, FILTERS AND DISINFECTION EQUIPMENT SHALL BE TESTED AND APPROVED BY THE PERTINENT MANUFACTURER USING THE NSF/ANSI STANDARD 50 AND LISTED AS APPROVED BY THE NSF.4. THE FILTER ROOM FLOOR IS SLIP RESISTANT AND SLOPED TO FLOOR DRAINS5. ALL PLASTIC PIPING SUBJECT TO PROLONGED SUNLIGHT EXPOSURE MUST BE COATED TO PROTECT IT FROM ULTRAVIOLET LIGHT DEGRADATION.6. EACH WASTE LINE SHALL HAVE A UNIQUE AIR GAP. WASTE LINES FROM DIFFERENT SOURCES (E.G. POOL, SPA, OVERFLOW, SUMP PUMP) SHALL NOT BE TIED TOGETHER BUT MAY DISCHARGE INTO A COMMON SUMP OR RECEPTACLE.7. THE WASTE LINE MUST BE CONNECTED TO AN APPROVED WASTE DISPOSAL SYSTEM ACCORDING TO LOCAL OR STATE CODES.8. ALL COLLECTOR TANKS SHALL HAVE COVED INTERSECTIONS AND SLOPE TO THE TANK DRAIN.9. AN AUTOMATIC AND MANUAL WATER MAKEUP CONTROL MUST BE PROVIDED TO MAINTAIN THE WATER LEVEL AT THE DESIRED COLLECTOR TANK VOLUME AND MUST DISCHARGE THROUGH AN AIR GAP INTO A FILL PIPE OR COLLECTOR TANK.
10. A RATE OF FLOW INDICATOR, READING IN GPM, SHALL BE INSTALLED ON THE FILTER RETURN LINE. THE RATE OF FLOW INDICATOR SHALL BE PROPERLY SIZED FOR THE DESIGN FLOW RATE AND SHALL BE CAPABLE OF MEASURING FROM ONE HALF TO AT LEAST ONE-AND-ONE-HALF TIMES THE DESIGN FLOW RATE. THE CLEARANCES UPSTREAM AND DOWNSTREAM FROM THE RATE OF FLOW INDICATOR SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION SPECIFICATIONS.
11. THESE PLANS HAVE BEEN PREPARED IN COMPLIANCE WITH THE LOCAL BUILDING CODE - LATEST EDITION
LINE FUNCTION SIZE
PIPE AND VALVES CHART
MAIN DRAINRECIRCULATION RETURN
8"4"
RECIRCULATION PUMP SUCTION OVERFLOW
3"4"
FRESH WATER FILL 1" (MIN)TANK DRAIN 2"STATIC LINE 2"FEATURE PUMP SUCTION 6"
IWF FILTER TANK EQUIPMENT LIST
COLLECTOR TANK 4000 GALLON CAPACITYFILTER ELEMENT (FEATURE) (8) UNICELL C-7697, 155 SQ FT FILTER AREA EACH (465 GPM MAX)WATER LEVEL CONTROL HYDRAULIC VALVE W/ MANUAL FILL VALVE, RESERVOIRACCESS HATCHWAY DUAL 5'x8' FIBERGLASS LOCKABLE HATCHWAY W/ HYDRAULIC ASSIST VACUUM LINE 2"ACTUATED FEATURE BYPASS (2) 4"
COMPONENT ID
FRONT ELEVATION SIDE ELEVATION
FILTER TANK
FILTER TANK FILTER TANK
3" RECIRC RETURNW/ DIFFUSION MANIFOLD
4" RECIRC PUMP SUCTION
2" LEVEL CONTROL
1" AUTOFILL
PVC LADDER
8" MAIN DRAIN 4" OVERFLOW
6" FEATURE PUMP SUCTION
2" TANK DRAIN
VACUUM CARTRIDGE FILTERS
(TYP OF 8)
LOCKABLE S.S. HASP
(TYP)
HINGED LID W/308 S.S. HARDWARE
150 LBS LOCKING HYDRAULIC PISTON
TANK SUMP DRAIN WITH 2" FITTING
4"x6" STRENGTHENING BANDS
LAMINATED TO TANK TO ENSURE INTEGRITY
PLAN VIEW
FILTER TANK
FF ELEV
4" ACTUATED BYPASS RETURN
FIELD CAST, 2500 PSI MIN.
CONCRETE FOOTING UNDER
STEEL FRAME & COVER
SHIM FRAME ON BRICKSGRAVEL SUBBASE
1"x1" STEEL FRAMELAMINATED TOCOLLECTOR TANK
COMPACTED FILL COMPACTED FILL
MOUNTING DETAIL
(RECOMMENCED)
FF ELEV
COMPACTED SUBBASECONTRACTOR TO REFER TOLOCAL SOIL CONDITIONS TOCONFIRM ADEQUATE DENSITYNOTE:
(VOLUME OF FOOTING TO
EXCEED HYDROSTATIC UPLIFT
WHEN RESERVOIR IS EMPTY)
12. MANIFOLD SHOULD BE MOUNTED NO FURTHER THAN 15' FROM THE RECIRCULATION EQUIPMENT. 4" ACTUATED BYPASS RETURN
2" VACUUM LINE
TYPE
DATE
--
DWG
NO
SHEET
Water Odyssey™ by Fountain People, Inc. ~ PO Box 807 ~ San Marcos, Texas 78667-0807 Phone (512) 392-1155 ~ Fax (512) 392-1154 ~ www.waterodyssey.com VER. OPT. REV. 04 12 23 AW040722 1 A EQ R1 1 of 5
CPS
-
EQ DESIGN
135-400 INTERACTIVE WATER FEATURE
COLLECTOR TANK
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1044 of 1214
EQ
AWSP-2
SPLASH PAD RECIRC & FEATURE DETAIL
SCALE: 1/2" T0 1'
WASTE LINE
AIR GAP DETAIL
WASTE LINE FROM
COUPLING OR SUMP POOL FILTER
TO WASTEDISPOSAL SYSTEM
AIR GAP
RECIRCULATION PUMP CURVE
FEATURE/RECIRC CABINET
(RECOMMENDED)
EQUIPMENT COVER
FRONT VIEW
EQUIPMENT COMPONENTS ID
PLAN VIEW
IWF FILTER EQUIPMENT LIST
FEATURE PUMPCOLLECTOR TANK AT4000, 4000 GALLON CAPACITYCHLORINE FEEDER CHLORINE RESERVOIR TANKpH FEEDER STENNER 45M2, 10 GPD CAPACITY, 110V, 1.7A pH RESERVOIR TANKVACUUM GAUGE WIKA, 0-30 IN HG, LIQUID FILLED, 1/4" NPT, 2" FACE DIAMETERPRESSURE GAUGE WIKA, 0-60 PSI, LIQUID FILLED, 1/4" NPT, 2" FACE DIAMETERCHEMISTRY CONTROLLER HAYWARD, CAT2000 30 GALLON WITH LOCKABLE LIDSTENNER 45M5, 50 GPD CAPICITY, 110V, 1.7A30 GALLON WITH LOCKABLE LID FILTER ELEMENT (FEATURE) (8) UNICELL C-7697, 155 SQ FT FILTER AREA EACH (465 GPM MAX)WATER LEVEL CONTROL HYDRAULIC VALVE W/ MANUAL FILL VALVE, RESERVOIRIWF CONTROLLER WATER ODYSSEY DSC 8-32-A SAND FILTER (RECIRC)RECIRC FLOWMETER 3" BLUE-WHITE, F-30300, 45-240 GPM RANGERECIRC PUMP PENTAIR, TRITON, TR140, 7.06 SQ FT FILTER AREA
LINE FUNCTION SIZE
PIPE AND VALVES CHART
MAIN DRAINTANK DRAINRECIRCULATION PUMP DISCHARGESIGHTGLASS TO WASTE 8"2"
RECIRCULATION PUMP SUCTION
2.5"3"4"
RECIRC TO FILTER 3"RECIRC RETURN 3"FEATURE PUMP SUCTION 6"FEATURE PUMP DISCHARGE 6" UV SANITIZER EVOQUA, WF125-6-N, 660 GPM MAX @ 60 mJ
FEATURE MANIFOLD (2)SIGHT-GLASSMULTIPORT VALVE PENTAIR 261050 HI FLOW HAYWARD SP1074S
UV SANITIZER FEATURE PUMP
100W SERVICE LIGHT
ELECTRICAL PANEL
CHEMISTRY CONTROLLER
132 "
60 "
1" x 1" STEEL FRAMESIDEWALL VENT(TYP BOTH SIDES)
SHIM FRAME ON BRICKSAS NEEDED TO ENSURE LEVEL SURFACE
FIELD CAST 6" THICK, 2500 PSI
CONCRETE FOOTING UNDER
STEEL FRAME & COVER
60 "
42 "
31 "
132 "
614 "
EQUIPMENT COVER
SIDE VIEW
STRAINER, 135 GPM @ 60' TDH, 230V, 1Ø, 16.0APENTAIR, INTELLIPRO XF VS 023056, 3 HP WITH INTEGRAL BASKET
INTELLIFLO XF VARIABLE SPEED PERFORMANCE CURVES
TOTAL HEAD
0 0 0
102030405060708090
100110
20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 102030405060708090100110
FLOW RATE IN U.S. GPM
MAX SPEED
@ SPEED 3-2350 RPM
@ SPEED 2-1500 RPM
@ SPEED 4-3110 RPM
@3450 RPM
@ SPEED 1-750 RPM
EQUIPMENT COVER
PLAN VIEW
CHLORINE FEEDER
pH FEEDER
2" TANK DRAIN LINE
4" RECIRC SUCTION
3" FILTER INFLUENT
2" BACKWASH TO WASTE
3" RECIRC RETURN TO TANK 3" FLOWMETER
PRESSURE GAUGE (TYP)
MULTIPORT VALVE
SAND FILTER
2" VACUUM LINE
VACUUM LINE 2"
FEATURE PUMP CURVE
ACTUATED FEATURE RETURNS SIZE VARIES, 4" ACTUATED BYPASSWATER ODYSSEY, WMF-12 MANIFOLD: PANEL MOUNT
WATER ODYSSEY
EL 0'-0" (ASSUMED)
FINISHED GRADE
(BY CONTRACTOR)
ELECTRICAL JUNCTION
60 "
72 "
72 "
42 "
60 "
TOP VIEW
CHEMICAL CABINET CHEMICAL CABINET
FIELD CAST 4" THICK 2,500 PSI
CONCRETE FOOTING UNDER
STEEL FRAME
SHIM FRAME ON
BRICKS AS NEEDED
1"X1" STEELFRAME (TYP.)
66.5"
43.25"
53"
43.25"
32"
PLAN VIEW
32"
55.5"
1"X1" STEELFRAME (TYP.)
100W SERVICE LIGHT
RESERVOIR
LABELED:
"CHLORINE"
RESERVOIR
LABELED:
"pH"
12" 12"
EXHAUST BLOWER
FRONT ELEVATION SIDE ELEVATION
CHEMICAL CABINET
CHEMICAL CABINET
UL SEALTIGHTTO EQUIPMENT PACK
6" FEATURE SUCTION
4" FEATURE RETURN (TYP OF 2)
RECIRC PUMP
3" TO FILTER
UV STRAINER
STRAINER, 400 GPM @ 60' TDH, 208-230V, 3Ø, 26.4APENTAIR, EQKT1000, 340610, 10 HP WITH INTEGRAL BASKET
WATER ODYSSEY
TOTAL HEAD
EFFICIENCY
NSPHR
BHP
PENTAIR EQ SERIES PERFORMANCE CURVE
EQ1000
FLOW RATE IN U.S. GPM
10203020206070
80 0
0 100 200 300 400 500 600 700
20 0
406080
100120
TDH
EFFICIENCY
NPSHR
BHP
VFD DANFOSS, AQUADRIVE VLT, FC-202, 10 HP PHASE CONVERTING VFD VFD
MANIFOLD COVER
FRONT VIEW
MANIFOLD COVER
PLAN VIEW
91 "
60 "
91 "
614 "
WATER ODYSSEY
%UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 MANIFOLD CABINET 24 VALVE
PLAN VIEW
4" ACTUATED BYPASS
JUNCTION BOX
12 VALVE MANIFOLD
4"' FROM FEATURE PUMP4"' FROM FEATURE PUMP
%UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 4" ACTUATED BYPASS
12 VALVE MANIFOLD
FEATURE DISCHARGE TO MANIFOLD (2) 4"
&$7
VG
/$%(/$5($
TYPE
DATE
--
DWG
NO
SHEET
Water Odyssey™ by Fountain People, Inc. ~ PO Box 807 ~ San Marcos, Texas 78667-0807 Phone (512) 392-1155 ~ Fax (512) 392-1154 ~ www.waterodyssey.com VER. OPT. REV. 04 12 24 AW040722 1 A EQ R1 2 of 5
CPS
-
EQ DESIGN
135-400 INTERACTIVE WATER FEATURE
EQUIPMENT COMPONENT ID
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1045 of 1214
RD
AWSP-3 SCALE: 3/4" T0 1'
LINE FUNCTION SIZE
PIPE AND VALVES CHART
MAIN DRAIN TO RAIN DIVERTER 8"FLOOR DRAIN (2) 2"MAIN DRAIN TO COLLECTOR 8"MAIN DRAIN TO STORM 4"
IWF FILTER TANK EQUIPMENT LIST
RAIN DIVERTER EQUIPMENT
PLAN VIEW
RAIN DIVERTER COMPONENT ID
PLAN VIEW
RAIN DIVERTER VAULT
SIDE ELEVATION
RAIN DIVERTER VAULT
FRONT ELEVATION
1" CONDUIT TO IWF CONTROLLER
2" GRATED FLOOR DRAIN (TYP OF 2)
4" TO STORM
8" TO COLLECTORMAIN DRAIN LINE
DRAIN LINE
8" ELECTRONIC BUTTERFLY TEE VALVEW/ LINKAGE
8" MAIN DRAIN FROMSPLASH PAD
HINGED LID W/
308 S.S. HARDWARE
115 LBS LOCKING HYDRAULIC PISTON
SHIM FRAME ON BRICKSAS NEEDED FIELD CAST 6" THICK, 2500 PSI CONCRETE FOOTING UNDER
STEEL FRAME & COVER
RAIN DIVERTER WATER ODYSSEY, RAIN DIVERTER SYSTEMELECTRIC VALVES VALWORX, ELECTRIC BUTTERFLY TEE VALVE, 24VDC/VAC
RAIN DIVERTER VAULT
WATER ODYSSEY
TYPE
DATE
- -
DWG
NO
SHEET
Water Odyssey™ by Fountain People, Inc. ~ PO Box 807 ~ San Marcos, Texas 78667-0807 Phone (512) 392-1155 ~ Fax (512) 392-1154 ~ www.waterodyssey.com VER. OPT. REV. 04 12 24 AW040722 1 A EQ R1 3 of 5
CPS
-
EQ DESIGN
135-400 INTERACTIVE WATER FEATURE
RAIN DIVERTER
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1046 of 1214
B
A
3 MANUFACTURER & MODEL NO.
FIXTURE SCHEDULE:
A
B
C
F
G
CONDUCTORS
MARK PHASE CONDUIT
PANEL FEED
CONDUCTORS AND CONDUIT INSTALLED BY OTHERS
FEEDER & CIRCUIT SCHEDULE:
LOAD AMPS
1-2
PANEL SCHEDULE:
5 5
5 1
8 F
D
E
6 1 20A SERVICE LIGHT
MARK DESCRIPTION
MAIN LUG BREAKER PANEL
(16 CIRCUIT)
RECIRCULATION PUMP
CHLORINE FEEDER PUMP
ACID FEEDER PUMP
VOLTAGE
208-230 SIEMENS, PW1624L1125CU
CIRCUIT POLE TRIP
2 40A GFI REC. PUMP W/INTERLOCKED CHEMICALS
1.5 19.4
208-230V PENTAIR, INTELLIFLO XF VS 023056, 3 HP
STENNER 45M5STENNER, 45M2
115V115V
NEUTRAL GROUND REMARKS
UL SEALTITEUL SEALTITESEALTITE TO PANELSEALTITE TO PANELSEALTITE TO PANEL 1 -#12 1 - #12 1 - #12 1/2"1 -#12 1 - #12 1 - #12 1/2"
3 -#8 1 - #8 1"
1 2
3 5
84 6
TOTAL MAXIMUM LOAD 72.2
CHEMICAL CONTROLLER 115V HAYWARD CAT 2000
9-16 SPARE
5 1 20A GFCI 3.0
100 WATT SERVICE LIGHT FIXTURE 115V INTERMATIC, VPXG11GCI 100W 4 G
THREE-PHASE, 4-WIRE — 208Y/120 VAC OR 240 VAC INSULATED/BONDABLE NEUTRAL CURRENT WITHSTAND RATING MAX. RMS. SYM. 10,000A 12/240V D
E
H GFCI DUPLEX RECEPTACLE 115V PASS & SEYMOUR
I
I ELECTRICAL INTERLOCK 115/208-230V MCG, 40A DEFINITE PURPOSE CONTACTOR H
1/2" SEALTITE TO PANEL
7 5
J
J FEATURE CONTROLLER 115/208-230V WATER ODYSSEY FEATURE CONTROLLER K ACTIVATION BOLLARD 12/24/115V WATER ODYSSEY FEATURE ACTIVATOR K
7 2 -#18 1 - #18 1 - #18
5 3
2 C
7 1 20A FEATURE CONTROLLER 1.1
FEATURE PUMP 208-230V PENTAIR, EQKT1000, 340610, 10 HP
3-4
2 60A GFI FEATURE PUMP 40.0
L UV SANITIZER 115-120V EVOQUA, WF125-6-N
8 1 20A UV SANITIZER 7.2
2 -#8 1 - #8 1/2"
ELC
AWSP-4
ELECTRICAL RISER
SCALE: 3/4" T0 1'
VFD
6 2 -#6 1 - #6 1"
TYPE
DATE
- -
DWG
NO
SHEET
Water Odyssey™ by Fountain People, Inc. ~ PO Box 807 ~ San Marcos, Texas 78667-0807 Phone (512) 392-1155 ~ Fax (512) 392-1154 ~ www.waterodyssey.com VER. OPT. REV. 04 12 24 AW040722 1 A EQ R1 4 of 5
CPS
-
EQ DESIGN
135-400 INTERACTIVE WATER FEATURE
ELECTRICAL RISER DIAGRAM
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1047 of 1214
1" PVC TO FRESH WATER
2" PVC CAPPED
8" PVC TO RAIN DIVERTER
4" PVC TO WASTE
2" PVC
3" PVC
4" PVC
3" PVC
6" PVC
4" PVC
2" PVC TO WASTE
2" PVC
6" PVC
PD
AWSP-5
SPLASH PAD EQUIPMENT PLUMBING DIAGRAM
SCALE: 3/4" T0 1'
2" PVC
2" PVC
2" PVC
4" PVC
4" PVC
4" PVC
4" PVC
4" PVC
4" PVC
8" PVC TO MAIN DRAIN
4" PVC TO WASTE
4" PVC
6" PVC
4" PVC
3" PVC
PVC SIZES VARY (SEE PLUMBING LAYOUT PAGE FOR MANIFOLD DETAIL) NOTES:
1. COLLECTOR TANK - MAIN DRAIN SHOULD SLOPE CONTINUOUSLY TO COLLECTOR TANK. MAIN DRAIN PIPING SHOULD NOT EXCEED 100' FROM PAD TO COLLECTOR TANK.2. ELEVATIONS - TOP OF COLLECTOR TANK IS RECOMMENDED TO BE SET AT THE SAME ELEVATION AS FINISHED SPLASH PAD FLOOR TO ENSURE DESIRED VOLUME. TANK SHOULD BE NO FURTHER THAN 30 FEET FROM PUMPING EQUIPMENT.3. PLUMBING - ENSURE ALL PLUMBING LINE ELEVATIONS ARE BELOW SUCTION END OF THE PUMPS TO AVOID AIR LOCKS. PLUMBING DIAGRAM NOT TO SCALE: ACTUAL LINE LENGTHS TBD IN FIELD %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 %UDVV1LS&ORVH037 %UDVV6FK&ORVH1LSSOH037 4" PVC
4" PVC 4" PVC
VG
/$%(/$5($
TYPE
DATE
--
DWG
NO
SHEET
Water Odyssey™ by Fountain People, Inc. ~ PO Box 807 ~ San Marcos, Texas 78667-0807 Phone (512) 392-1155 ~ Fax (512) 392-1154 ~ www.waterodyssey.com VER. OPT. REV. 04 12 24 AW040722 1 A EQ R1 5 of 5
CPS
-
EQ DESIGN
135-400 INTERACTIVE WATER FEATURE
PLUMBING LAYOUT RISER
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1048 of 1214
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1049 of 1214
TYPE
DATE
- -
DWG
NO
SHEET
Water Odyssey™ by Fountain People, Inc. ~ PO Box 807 ~ San Marcos, Texas 78667-0807 Phone (512) 392-1155 ~ Fax (512) 392-1154 ~ www.waterodyssey.com VER. OPT. REV. 04 20 24 W81074 1 A PD 1 1 of 2
PLAN
SALES
PIPE
CUDAHY PARK OPTION 1
PIPING DIAGRAM
SCALE - 3/32"=1'
0 2 4 8
@ 11" x 17"
4850 SQ FT
:
:
:
:00
:00
:00
NOTES:
1. THIS DRAWING IS SCHEMATIC IN NATURE. LOCATIONS RECOMMENDED FOR PLAY COMPONENTS AND DRAINS ARE APPROXIMATE. PIPING AND CONDUIT RUNS ARESCHEMATIC.
2. CHECK LOCAL CODES FOR PIPING REQUIREMENTS. JOB CONDITIONS AND LOCAL CODES MUST DETERMINE FINAL ROUTING.
3. REFER TO THE INSTALLATION DRAWING OF EACH PLAY FEATURE AND EQUIPMENT VAULT OR UTILITY BOX FOR SPECIFIC INSTALLATION DETAILS.
4. PIPING, CONDUIT, AND WIRE ARE BY INSTALLER.
5. ANY REQUIRED BACKFLOW DEVICE OR WATER METER ON THE CITY WATER MAIN SHALLBE PROVIDED BY INSTALLER.
6. PIPE SIZES ASSUME 100' MAXIMUM RUNS. LONGER RUNS MUST BE EVALUATED BY WATER ODYSSEY. CONTRACTOR RESPONSIBLE FOR VERIFICATION OF PIPE SIZE BETWEEN DISCHARGE MANIFOLD AND FEATURES. VELOCITY NOT TO EXCEED 8FT/SECOND.
7. A MAXIMUM OF 50 PSI @ PROVIDED MANIFOLD.
8. SYMBOL "*" INDICATES THAT THE TEE MUST BE PLACED IN THE CENTER OF THE PIPING RUN TO ENSURE BALANCED FLOW.
9. WET DECK AREA MUST BE POURED AND FORMED SO THAT WATER SHED AREA SLOPES TOWARD DRAINS.
10. ALL PIPING TO FEATURES ARE RECOMMENDED TO HAVE 1%-2% SLOPE FOR WINTERIZATION.
LOCATION AND ORIENTATION OFEQUIPMENT ROOM AND EQUIPMENTBY OTHERS. SEE NOTE #6.
LOCATION OF COMPONENTS INSIDEENCLOSURE MAY DIFFER FROM THISLAYOUT. REFER TO RECIRCULATION SYSTEM DRAWINGS FOR DETAILS.
V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12 V13 V14 V15 V16 V17 V18 V19 V20 V21 V22 V23 V24 9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
6"P
6"P
6"P
MANIFOLD #1
MANIFOLD #2
GRAVITY DRAIN
TO COLLECTOR TANK
RESERVOIR
8"P
8"P
DETAIL A
SEE SHEET 2
Cudahy Park Renovation Project, Project # PRE-001 Document Control 1050 of 1214