City · Energy
Salinas
Energy contracts the Salinas City Council took up since 2022. All Salinas meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
10actions
7vendors
$4,774,025approved (recorded vote)
$21,819,799proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2025-09-09 | Enterprise Fleet Management | Pilot small-scale vehicle fleet leasing program: master equity lease of ten vehicles with Enterprise Fleet Management Trust via Sourcewell contract 03122-EFM Fleet vehicles | Cooperative purchase | $658,000 | 10 vehicles: six (6) Ford F150 Lightning trucks, one mid-size electric… $8,800 per month, or $105,600 per year | No vote recorded | staff report · staff report · staff report · city original |
| 2025-08-12 | Enterprise Fleet Management | Recommend that the Finance Committee provide feedback and direction on the leasing of 10 vehicles from Enterprise Fleet Management. Fleet vehicles | Award | — | ten (10) vehicles: six (6) F150 Lightning trucks, one mid-size electri… $8,800 per month or $105,600 per year | No vote recorded | staff report · city original |
| 2024-12-03 | ENGIE Services U.S. | Energy Services Contract with ENGIE for Photovolatic (PV) Systems and Back-Up Generator at City Facilities check Bundles | Award | $4,774,025 | solar PV systems at El Gabilan Library and Police Department and a bac… Annual Maintenance Fee escalates 5% per year; repair labor rates per h… anticipated savings of approximately $5 million over the 20-year life … | Approved 7-0 | staff report · staff report · staff report · staff report · agenda |
| 2024-12-03 | Banc of America Public Capital | 2024 Energy Equipment Lease check Bundles | Award | $4,900,000 not to exceed | fixed 4.255% interest rate; not-to-exceed 4.30% over $5 million savings over the life of the project | No vote recorded | staff report · staff report · staff report · staff report · other |
| 2024-12-03 | BAPCC | Energy Efficiency Lease Staff Report (2024 Lease financing for ENGIE energy improvements) check Bundles | Award | $4,900,000 not to exceed | BAPCC has provided a fixed 4.255% interest rate for the 2024 Lease over $5 million savings over the life of the project | No vote recorded | staff report · city original |
| 2024-11-19 | ENGIE Services U.S. | Energy Services Financing Contract with ENGIE for Facility Solar Projects Solar and solar PPAs | Award | — | Continued | agenda · minutes · other · other · other | |
| 2024-06-18 | CDW Government | Purchase of Battery Backup System for Servers Microgrids and backup power | Cooperative purchase | $81,000 not to exceed | one large UPS unit | No vote recorded | staff report · staff report · city original |
| 2024-03-05 | Diede Construction | Hebbron Family Center design build award to Diede Construction Bundles | Award | $10,579,600 | No vote recorded | staff report · city original | |
| 2022-10-18 | ENGIE Services U.S. | Agreement with Engie Services US, Inc. for Maintenance Services of the City's Solar Photovoltaic Systems Solar and solar PPAs | Award | $643,088 | seven photovoltaic systems totaling 3.6 MW | No vote recorded | staff report · staff report · staff report · staff report · staff report |
| 2022-08-09 | Ford Motor | Citywide Vehicle Purchases FY 23 Fleet vehicles | Award | $58,111 not to exceed | 1 | No vote recorded | staff report · city original |