Cities Index.
Vendor · Energy

ARB

Contract actions with ARB in California city council documents since 2022 — also written as ARB Inc.; ARB, Inc; ARB, Inc..

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
6actions
2cities
$369,206,248approved (recorded vote)
$43,102,000proposed, no vote in the index
2022-08-16first action in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateCityItemActionAmountSize · price · savingsOutcomeSources
2025-05-20GlendaleRequest to Increase the ARB, Inc. Balance of Site Engineering, Procurement, and Construction Contract's current Contingency of $36,270,000 by $30,000,000 to a N check
Battery storage
Amendmentsee source23 PCS and 92 BatteriesNo vote recordedstaff report · packet · city original
2023-11-14GlendaleMotion authorizing the City Manager to execute Amendment No. 1 to PSA Contract No. 8002155 with ARB, Inc., increasing not to exceed amount by $330,000 to $630,0 check
Battery storage
Award$362,700,000
not to exceed
75-megawatt / 300-megawatt-hour battery energy storage system; 3-engin…Approved
Ayes: Devine, Kassakhian, Najarian, Brotman; Absent: Asatryan
staff report · agenda · minutes · packet · packet
2023-11-14GlendaleResolution authorizing EPC contract with ARB, Inc. not to exceed $362,700,000 plus 10% contingency for BESS Power Island and related work (Grayson Repowering Pr check
Battery storage
Amendment$43,102,000
not to exceed
BESS Power Island, BOS work, integration into Utility Operations Cente…No vote recordedstaff report · staff report · agenda · packet · packet
2023-08-16UkiahUndergrounding Project, Specification Number 23-08, to ARB, Inc in the Amount of $1,958,740.78
Other
Award$1,958,741Approved
AYES: Orozco, Sher, Crane, and Rodin. NOES: None. ABSENT: Dueňas. ABSTAIN: None
packet · city original
2023-06-06GlendaleGrayson Repowering Project – Balance of Site Engineer, Procure, and Construct Request for Proposals; Professional Services Agreement with ARB, Inc. for prelimin
Battery storage
Sole-source award$300,000
not to exceed
75 MW/300 MWH Battery Energy Storage SystemApproved
Ayes: Devine, Kassakhian, Brotman; Noes: None; Absent: Najarian; Abstain:…
agenda · packet · packet · city original
2022-08-16GlendaleResolution rejecting the sole bid received in response to Glendale Water & Power Bid Specification No. 3904, Unit 9 Separation, dispensing with further competit
Other
Sole-source award$4,247,507
not to exceed
Approved
Ayes: Asatryan, Brotman, Devine, Najarian, Kassakhian; Noes: None
agenda · minutes · packet · packet · city original

Cities

Glendale · Ukiah