Vendor · Energy
ARB
Contract actions with ARB in California city council documents since 2022 — also written as ARB Inc.; ARB, Inc; ARB, Inc..
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
6actions
2cities
$369,206,248approved (recorded vote)
$43,102,000proposed, no vote in the index
2022-08-16first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2025-05-20 | Glendale | Request to Increase the ARB, Inc. Balance of Site Engineering, Procurement, and Construction Contract's current Contingency of $36,270,000 by $30,000,000 to a N check Battery storage | Amendment | see source | 23 PCS and 92 Batteries | No vote recorded | staff report · packet · city original |
| 2023-11-14 | Glendale | Motion authorizing the City Manager to execute Amendment No. 1 to PSA Contract No. 8002155 with ARB, Inc., increasing not to exceed amount by $330,000 to $630,0 check Battery storage | Award | $362,700,000 not to exceed | 75-megawatt / 300-megawatt-hour battery energy storage system; 3-engin… | Approved Ayes: Devine, Kassakhian, Najarian, Brotman; Absent: Asatryan | staff report · agenda · minutes · packet · packet |
| 2023-11-14 | Glendale | Resolution authorizing EPC contract with ARB, Inc. not to exceed $362,700,000 plus 10% contingency for BESS Power Island and related work (Grayson Repowering Pr check Battery storage | Amendment | $43,102,000 not to exceed | BESS Power Island, BOS work, integration into Utility Operations Cente… | No vote recorded | staff report · staff report · agenda · packet · packet |
| 2023-08-16 | Ukiah | Undergrounding Project, Specification Number 23-08, to ARB, Inc in the Amount of $1,958,740.78 Other | Award | $1,958,741 | Approved AYES: Orozco, Sher, Crane, and Rodin. NOES: None. ABSENT: Dueňas. ABSTAIN: None | packet · city original | |
| 2023-06-06 | Glendale | Grayson Repowering Project – Balance of Site Engineer, Procure, and Construct Request for Proposals; Professional Services Agreement with ARB, Inc. for prelimin Battery storage | Sole-source award | $300,000 not to exceed | 75 MW/300 MWH Battery Energy Storage System | Approved Ayes: Devine, Kassakhian, Brotman; Noes: None; Absent: Najarian; Abstain:… | agenda · packet · packet · city original |
| 2022-08-16 | Glendale | Resolution rejecting the sole bid received in response to Glendale Water & Power Bid Specification No. 3904, Unit 9 Separation, dispensing with further competit Other | Sole-source award | $4,247,507 not to exceed | Approved Ayes: Asatryan, Brotman, Devine, Najarian, Kassakhian; Noes: None | agenda · minutes · packet · packet · city original |