Cities Index.
Agenda, first session

Fairfield City Council
May 7, 2024

Document
Agenda, first session
Meeting
May 7, 2024
Body
Fairfield City Council
Pages
77
Original file
3.0 MB
Text extracted from the city's file for reading and search. Open the original on eservices.fairfield.ca.gov. That file is the official record.

Section 3. The city manager is hereby authorized and directed to execute the attached power purchase agreement with Onyx.

Section 4. The council further authorizes the city manager to take all steps necessary to implement this resolution.

PASSED AND ADOPTED this 7th day of May 2024, by the following vote:

AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/TONNESEN/VACCARO/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________

_________________________________________________
MAYOR
ATTEST:
___________________________

CITY CLERK

Packet Page 752 of 1189Attachment 1 Page 2 of 2

i

POWER PURCHASE AGREEMENT
by and between
Onyx Development Group LLC
and
City of Fairfield, California
Packet Page 753 of 1189Attachment 2 Page 1 of 159

ii

TABLE OF CONTENTS
TABLE OF CONTENTS .............................................................................................................. II RECITALS .................................................................................................................................... 1 AGREEMENT .............................................................................................................................. 2

1. DEFINITIONS. ....................................................................................................................... 2

2. TERM. .................................................................................................................................. 2

3. REMOVAL OF SYSTEM. ......................................................................................................... 2

4. PURCHASE AND SALE OF OUTPUT AND BATTERY SYSTEMS SERVICES. ................................ 3

5. DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE..................................................... 7

6. COMMERCIAL OPERATION DATE; CONDITIONS PRECEDENT; NOTICE TO PROCEED. .......... 15

7. OWNERSHIP OF SYSTEM, OUTPUT, GREEN ATTRIBUTES AND ENVIRONMENTAL FINANCIAL INCENTIVES. ....................................................................................................................... 19

8. PAYMENT. .......................................................................................................................... 20

9. PURCHASE OPTION............................................................................................................. 20

10. EARLY TERMINATION. ....................................................................................................... 21

11. DELIVERY; RISK OF LOSS; RELOCATION. ........................................................................... 22

12. METERING. ........................................................................................................................ 24

13. REPRESENTATIONS, WARRANTIES AND COVENANTS. ........................................................ 25

14. DEFAULT AND REMEDIES. .................................................................................................. 26

15. DISPUTE RESOLUTION. ....................................................................................................... 28

16. TAXES; LIENS. ................................................................................................................... 28

17. LIABILITY AND INDEMNITY; INSURANCE. .......................................................................... 29

18. EASEMENT. ........................................................................................................................ 30

19. ASSIGNMENT; COOPERATION WITH FINANCING. ................................................................ 31

20. CONFIDENTIALITY; PUBLICITY. .......................................................................................... 32

21. LEGAL EFFECT AND STATUS OF AGREEMENT. ................................................................... 33

22. MISCELLANEOUS. .............................................................................................................. 34 Packet Page 754 of 1189Attachment 2 Page 2 of 159

iii
EXHIBIT A – DEFINITIONS ............................................................................................................ 39 EXHIBIT B – POWER PRICE AND OUTPUT GUARANTEE RATE .................................................... 45 EXHIBIT C – BATTERY SYSTEMS GUARANTEE RATE ................................................................. 47 EXHIBIT D – TERMINATION VALUES ........................................................................................... 48 EXHIBIT E – PROJECT DEVELOPMENT SCOPE RESPONSIBILITY ................................................ 49 EXHIBIT F – GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS ................................... 50 Packet Page 755 of 1189Attachment 2 Page 3 of 159

1 POWER PURCHASE AGREEMENT
This Power Purchase Agreement (“Agreement” or “PPA”) is made and entered into as of , (“Effective Date”), between Onyx Development Group LLC (“Provider” or “Installer”), and the City of Fairfield, California (“City” or “Site Host”). City and Provider are collectively referred to herein as “Parties” and individually as “Party.”

RECITALS
WHEREAS, Provider is in the business of installing and operating solar photovoltaic and battery energy storage facilities and selling electric energy generated from such facilities; WHEREAS, Government Code section 4217.10 et seq. provides that public agencies may enter into agreements, including but not limited to, lease agreements, for real property upon which alternative energy facilities may be constructed so that the public agency may purchase the energy generated from the facilities constructed on the real property under a power purchase agreement; and
WHEREAS, the governing body of City has made those findings required by Section 4217.12 of the Government Code that: (i) the anticipated cost to City for electrical energy services provided by the solar photovoltaic and battery energy storage system under this Agreement will be less than the anticipated marginal cost to City of electrical energy that would have been consumed by City in the absence of those purchases and (ii) the difference, if any, between the fair market value of the right to access and occupy the real property subject to this Agreement and related payments under this Agreement, if any, is anticipated to be offset by below-market energy purchases or other benefits provided under this Agreement; and WHEREAS, City desires to reduce its energy costs as well as its dependence on fossil fuel electric generating resources and to promote the generation and storage of electricity from solar photovoltaic and battery energy storage facilities; and WHEREAS, Provider desires to design, install, own, maintain, and operate a solar photovoltaic system including all solar photovoltaic panels and equipment components (the “Solar Facility”) and the battery energy storage system and all equipment components (the “Battery System” or the “Battery Systems”) and collectively the “System” or the “Systems” on the real property (the “Site”) owned by the City as described in Schedule 1 attached hereto, and Provider shall sell all Output from the Solar Facility and provide services from the Battery Systems to City at those rates set forth herein (collectively the “Project”); and WHEREAS, Provider has developed an ownership and financing structure for the System, which facilitates the use of certain tax incentives, and accelerated depreciation to reduce the expected investment returns of its investors, and which benefits City by offering a competitive Power Price, as defined herein; and
Packet Page 756 of 1189Attachment 2 Page 4 of 159

2 WHEREAS, City desires to provide Provider an easement for the sole purpose of accessing City’s property to install, operate, maintain and repair the System; and WHEREAS, as part of this PPA and in consideration of the easement, Provider and City intend that Provider would obtain title, an ownership interest, and retain all financial incentives and tax benefits generated by the System and associated with the development of the System, including the installation, ownership and operation of the System and the sale of energy and services from the System to City.

NOW, THEREFORE, in consideration of the promises and the mutual benefits from the covenants hereinafter set forth, the receipt and sufficiency of which are hereby acknowledged, and intending to be legally bound, Provider and City hereby agree as follows:

AGREEMENT

1.Definitions.

Capitalized terms used in this Agreement shall have the meanings ascribed to them herein or in the attached Exhibit A.

2.Term.

A.Term. The Term of this Agreement shall commence upon the Effective Date and terminate automatically on the Expiration Date (“Initial Term”), unless terminated earlier as provided herein. City may renew this Agreement for up to two (2) five-year renewal terms (“Renewal Term”). The Initial Term and all subsequent Renewal Terms are referred to collectively as “Term.” This Agreement shall terminate automatically and concurrently with any termination of the Site easement provided by this Agreement.

3. Removal of System.

A.Removal of System. Within one hundred eighty (180) Days of the expiration or any termination of this Agreement (unless City has: (i) purchased the System under the terms of this Agreement, including, without limitation, all applicable requirements under Article 5, below; or (ii) otherwise consented in writing to allowing the System to remain installed on the Site), Provider shall, in coordination with City and at Provider’s sole cost and expense, remove the System from the Site. Provider shall bear the cost of any required storage of the System, if necessary, during Provider’s removal of the System.

B.Removal and Site Restoration. Removal of the System shall include all installed equipment, including, but not limited to, the System and all tangible and structural support materials, as well as all appurtenant equipment, above and below ground (except for empty conduits). Provider shall additionally restore the Site to a condition substantially similar to the pre- installation condition of the Site, excluding ordinary wear and tear, through reasonable efforts.

Provider’s restoration of the Site shall include, but is not limited to, any refinishing, landscaping, hardscaping, painting or other finish work, and cleaning. Provider shall undertake any repairs Packet Page 757 of 1189Attachment 2 Page 5 of 159

3 necessary as a result of such removal and restoration. The Parties shall reasonably coordinate all such removal, restoration, storage and transportation activities and dates.

C. Failure to Remove. If Provider fails to comply with this Section 3 and remove the System and restore the Site as required within such one-hundred and eighty (180) day period, City shall have the right, but not the obligation, to remove the System and restore the Site and charge Provider for the cost incurred by City, which cost shall include a twelve and one-half percent (12.5%) administrative fee. The Parties shall reasonably coordinate all such removal and pick-up activities. In the event that the Provider does not remove the System as specified herein, City shall also have the option of continuing to receive Output from the Solar Facility and Battery Systems Services at no cost to City, including, without limitation, no obligation to compensate Provider for the Power Price or other consideration, until the System is removed by either Provider or City.

This Section shall not be interpreted to limit City’s other available lawful remedies.

4. Purchase and Sale of Output and Battery Systems Services.

A. Purchase and Sale of Output. Beginning on the Commercial Operation Date and through the remainder of the Term, Provider agrees to sell and City agrees to buy all Output from the Solar Facility (the “Solar Facility Output”) and Output from the Battery Systems (the “Battery Systems Output”) at the applicable Power Price as set forth in Exhibit B. City shall have no obligation to pay for Solar Facility Output or Battery Systems Output delivered after the expiration date of this Agreement or the early termination thereof.

B. Cost Reimbursement. The Parties acknowledge that City will incur costs associated with this Project including amounts payable by City to third-party engineers, consultants, legal counsel, and inspectors (“Development Costs”). The Power Price set forth in Exhibit B includes consideration for reimbursement of Development Costs which shall be paid by Provider to City based on the following schedule:

1) 50% of the Development Costs within 15 days of the Effective Date of this Agreement (the “Effective Date Milestone”);

2) 25% of the Development Costs within 15 days of the date on which City issues Provider a Notice to Proceed to construction; and

3) 25% of the Development Costs within 15 days of the Commercial Operation Date.

C. Adjustment to Power Price; Distribution Utility Upgrades. The Parties acknowledge that the Power Price set forth in Exhibit B is based on certain assumptions, and that the Power Price may, if (and only if) the assumptions provided in this Section 4(C) are inaccurate, require an adjustment to the Power Price following the Effective Date with thirty (30) days’ prior written notice to City as follows:

1) Provider assumed that the total cost to be paid to the Distribution Utility in connection with the Distribution Utility Upgrades as stated in Exhibit B. 2) Provider assumed there shall not be material additional costs to re-design, construct, install or maintain the System due to unforeseen conditions or groundwork at the Packet Page 758 of 1189Attachment 2 Page 6 of 159

4 Site (including but not limited to excavation/circumvention of underground obstacles).
3) Provider assumed there are no Hazardous Substances at the Site. 4) The City shall procure, at no material cost to Provider, all planning and zoning permits required for the installation, construction, operation and maintenance of the Solar Facility and Battery Systems by June 1, 2024.
5) The City shall by June 1, 2024, either (i) procure, at no material cost to Provider, an exemption for the Solar Facility and Battery Systems from the California Environmental Quality Act (“CEQA”) or (ii) complete CEQA review and obtain approvals for the Solar Facility and Battery Systems as-designed as of the Effective Date.
6) Provider assumed any information provided by City and relied upon by Provider is accurate.

D. Provider’s Solar Facility Output Guarantee. Commencing with the second (2nd) Contract Year after the Commercial Operation Date of the System, and for each Contract Year thereafter during the Initial Term, the aggregate metered Solar Facility Output for the previous Contract Year (the “Measurement Period”) shall be at least ninety percent (90%) of the Annual Production Estimate for such Measurement Period for the Solar Facility as defined in Exhibit B (“Output Guarantee”); provided, the Annual Production Estimate is adjusted for actual weather conditions experienced at the Site, and the Output Guarantee for any Measurement Period will be reduced by the estimated generation of the Solar Facility that would have been generated during such Measurement Period, but was not generated, due to one or more of the following causes: (i) Outage; (ii) the actions or omissions of the Distribution Utility or the request or direction of the Distribution Utility; (iii) a Force Majeure event; (iv) buildings or structures constructed after the Commercial Operation Date overshadowing or otherwise blocking access or sunlight to the Solar Facility on or at the Site; (v) a breach of this Agreement by City; or (vi) any action or inaction by City that directly causes such reduction in generation (including but not limited to, pursuant to Sections 5.F, 11.C and 11.D below).

If the Solar Facility Output during any Measurement Period does not equal or exceed the Output Guarantee for such Measurement Period, Provider shall include in its next invoice to City (and in the final invoice for any credit owed for the final Contract Year) a credit for the Energy Shortfall Amount. Alternatively, City has the option to request that the Energy Shortfall Amount be paid by check independently of an invoice.

E. Provider’s Battery Systems Guarantee. Commencing with the first (1st) Contract Year after the Commercial Operation Date of the System, and for each Contract Year until the end of the tenth (10th) Contract Year of the Initial Term (the “Battery Guarantee Term”), the percentage of real time, measured and reported cumulatively by the supervisory control and data acquisition system, that one hundred percent (100%) of the nameplate power capacity of the Battery Systems (the “Battery Availability”) is available for the previous Contract Year (the Measurement Period) shall be equivalent to at least ninety percent (90%) of the total real time for such Measurement Period (8760 hours) (“Battery Systems Guarantee”); provided that, the Parties acknowledge and agree that the Battery Availability shall be reduced each Contract Year to account for the normal and expected degradation of the Battery System in accordance with Packet Page 759 of 1189Attachment 2 Page 7 of 159

5 manufacturer specifications; and provided further that the Battery Systems Guarantee for any Measurement Period will be reduced by the estimated real time that the Battery Systems would have been available during such Measurement Period, but was not available, due to one or more of the following causes: (i) an Outage; (ii) the actions or omissions of the Distribution Utility or the request or direction of the Distribution Utility; (iii) a Force Majeure event; (iv) a breach of this Agreement by City, or (v) any action or inaction by City that directly causes such reduction in generation (including but not limited to, pursuant to Sections 5.F, 11.C and 11.D below). Real time shall be measured in increments of hours. Provider additionally guarantees that during the Battery Guarantee Term, the Battery Systems will be available to provide at least the number of cycles per Contract Year (“Guaranteed Cycles”) indicated in Exhibit C when using the full Battery Systems kWh Rating. The Battery Systems shall be cycled in accordance with standard industry practices to maximize electricity cost savings to the City. For the absence of doubt, the Parties acknowledge and agree that the Battery Guarantee Term shall terminate at the end of the tenth (10th) Contract Year, and that beginning on the eleventh (11th) Contract Year neither the Battery Systems Guarantee nor the Guaranteed Cycles shall apply. Provider shall either replace or augment the Battery Systems at the end of the tenth (10th) Contract Year to mitigate the degradation of the Battery Systems. At least thirty (30) days prior to the tenth (10th) anniversary of the Commercial Operation Date, the Parties shall meet and endeavor in good faith to negotiate a Battery Systems Guarantee for the remaining fifteen (15) Contract Years of the Agreement to preserve the economic value of the Agreement to both Parties.

During the Battery Guarantee Term, if the percentage of real time, measured and reported cumulatively by the supervisory control and data acquisition system, that one hundred percent (100%) of the nameplate power capacity of the Battery Systems is available during any Measurement Period does not equal or exceed the Battery Systems Guarantee for such Measurement Period (each of the Battery Availability and the Battery Systems Guarantee as shall be adjusted in accordance with Section 4.E above), Provider shall include in its next invoice to City a credit for the Battery Systems Energy Shortfall Amount. Alternatively, City has the option to request that the Battery Systems Energy Shortfall Amount be paid by check independently of an invoice.

F. Resale of Output. If at any time during the term of this Agreement, the City reduces its consumption requirements for Solar Facility Output or Battery Systems Output and the Parties determine that the Distribution Utility is willing to purchase Solar Facility Output or Battery Systems Output pursuant to any current or future program of the Distribution Utility for net metering, energy credit, offsets or revenue, City, at its option, may sell Solar Facility Output or Battery Systems Output to the Distribution Utility pursuant to such program and in accordance with Section 4(G) below. If applicable and required by law, City may also request that Provider use reasonable efforts to cooperate with the City and the Distribution Utility, provided that nothing in the foregoing shall permit the City to sell Solar Facility Output or Battery Systems Output to the Distribution Utility if such sale would limit Provider’s rights and interests in and to this Agreement.

G. Net Metering, Credits and Storage of Output. Nothing in this Agreement shall limit City’s ability during the term of this Agreement to participate in or otherwise take advantage of any current or future program which may enable City to store Output or Battery Systems Output at any Site or to export Solar Facility Output or Battery Systems Output to any other site or to the Packet Page 760 of 1189Attachment 2 Page 8 of 159

6 Distribution Utility for any available energy credits, offsets, or revenue. City will give reasonable notice to Provider of its intention to undertake any such project or program and will coordinate with the Provider to ensure that the System, the terms and conditions of this Agreement and all associated warranties and guarantees are preserved, provided that City shall reimburse Provider for any documented and reasonable costs and expenses associated with such project or program (including, if applicable, reimbursement of: lost revenue at City Suspension Rate, loss of any Environmental Financial Incentives, and/or costs associated with any modification, removal, relocation, or temporary or permanent deactivation of the System or any portion thereof).

H. Grid Services Programs. From time to time, Provider or City may identify demand response or similar grid services programs, whereby the Battery Systems can help meet demands of the electrical grid, or improve its reliability, by charging or discharging the Battery Systems (or agreeing to make the Battery Systems available for charging or discharging) for which the Provider is eligible to participate (collectively, a “Grid Services Program”). Provider shall only enroll the Battery Systems in any Grid Services Program upon written agreement from City. Nothing in this paragraph shall prohibit City from undertaking participation in Grid Services Programs directly when eligible and Provider shall cooperate with City in ensuring that the Battery Systems operates to maximize revenue in relation to any Grid Services Program participation in accordance with Section 11(B), provided that City shall reimburse Provider for any documented and reasonable costs and expenses associated with such project or program (including, if applicable, reimbursement of: lost revenue at City Suspension Rate, loss of any Environmental Financial Incentives, and/or costs associated with any modification, removal, relocation, or temporary or permanent deactivation of the System or any portion thereof.

I. Outages. Provider may suspend delivery of Solar Facility Output or Battery Systems Output as reasonably necessary for testing, maintaining, replacing and repairing the System, or in response to any Distribution Utility directive or dispatch order (an “Outage”).

Provider shall take all steps necessary to minimize the duration and scope of any such Outage. In the event that an Outage is caused or prolonged by Provider’s negligent act or omission, Provider shall compensate City for the difference between the total electricity cost to the City for the applicable period of outage caused or prolonged by Provider’s negligent act or omission and the Power Price for each 15 minute interval that the Power Price is less than the electricity cost to the City. In such event, City shall provide Provider with evidence of the pricing for such applicable periods in the form of Distribution Utility bills during the outage period, and Provider shall provide the calculation and supporting documentation for determining these amounts, to the reasonable satisfaction of City. Except as set forth herein, City waives claims related to City’s costs of purchasing energy to replace what would have been produced by the System but for such Outages, along within any associated net metering, or similar, benefits.

If an Outage occurs under this Section and a payment is due from Provider to City, Provider shall include in its next invoice(s) to City (and in the final invoice for any credit owed for the final Contract Year) a credit for the difference between the electricity cost to the City for the applicable period.

J. Distribution Utility Electric Service. City may take parallel energy services from Distribution Utility.

Packet Page 761 of 1189Attachment 2 Page 9 of 159

7 5. Design, Construction, Operation & Maintenance.

A.All Provisions in this Article 5 shall apply to all activities of Provider undertaken in relation to the design, construction, installation, maintenance, repair, and operation of the System(s) throughout the Term of this Agreement (each provision as applies to the construction or installation of the System, the “Construction Provisions”).

B.Provider’s Contractor and Consultants. Provider shall ensure that any party contracting with Provider for any engineering, procurement, design, installation or construction of the System shall possess sufficient knowledge, experience, expertise, licensing, registration, and financial capacity and creditworthiness necessary for satisfactory completion of Provider’s obligations under this Agreement. The contractor performing the construction work on the Project shall possess a Class B or C-10 California Contractor State License, be a registered public works contractor in accordance pursuant to Labor Code Section 1725.5, and all other required licenses for performing work under this Agreement, prior to performing any work on the Project. Provider represents and warrants that it has the financial capacity, creditworthiness and bonding sufficient to satisfy all of Provider’s obligations under this Agreement, including, but not limited to, any instance of default or other failure by Provider’s contractor(s) to complete the work required to satisfy Provider’s obligations in this Agreement. Prior to contracting with any such party, Provider shall obtain and review the qualification of such party and complete any necessary background check or fingerprinting required by law or City. Provider shall further procure from the contractor performance and payment bonds and any other assurances as Provider deems reasonably necessary to secure contractor’s timely completion of the Project.

C.Permits. Provider shall be solely responsible for ensuring that the System is constructed in compliance with all applicable laws, regulations and Permits, and in accordance with the standards set by any governmental program providing funding for the System. Provider shall fully include and incorporate into any and all designs and engineering for the System, all improvements, conditions and mitigation measures required for compliance with the CEQA and where applicable the Americans with Disabilities Act (“ADA”). The City shall, at the City’s sole cost and expense, obtain (i) all necessary approvals demonstrating that the Systems are in compliance with CEQA as designed, provided that the City shall use best efforts to obtain written confirmation from CEQA, in form and substance reasonably acceptable to Provider, that the System is exempt from compliance with CEQA requirements, and (ii) all planning, zoning, and electrical permits and/or exemptions from Governmental Authorities having jurisdiction over the Project required for the installation, operation and maintenance of the System (clauses (i) and (ii) together, the “City Permits” and such City Permits as set forth in Exhibit E attached hereto).

Provider shall, at Provider’s sole cost and expense, obtain from all Governmental Authorities having jurisdiction over the Project, all other necessary Governmental Approvals and other Permits and approvals required for the installation, operation and maintenance of the System, including, but not limited to fire safety, California Occupational Safety and Health Administration (“Cal/OSHA”), utility interconnection, right-of-way permits, easement agreements and other related requirements (the “Provider Permits” and such Provider Permits as set forth in Exhibit E attached hereto).

Without limiting the City’s obligations with respect to the City Permits, to the extent action is required by City, City shall, upon the request of Provider, use reasonable efforts to assist Packet Page 762 of 1189Attachment 2 Page 10 of 159

8 Provider in obtaining and retaining Provider Permits, licenses, releases and other approvals necessary for the design, construction, engineering, installation, operation and maintenance of the System. Provider shall reimburse City for reasonable and documented costs incurred by City in assisting the Provider under this Section. Provider shall be responsible for all costs, expenses and improvements to the extent required to obtain or comply with any permits, Government Approvals or other requirement under state or federal law made necessary as a result of the System installation, operation and maintenance, except for the City Permits which shall be the sole cost and obligation of the City. Specifically, the Provider is required to obtain and submit all documents to close out the Project with the Governmental Authorities having jurisdiction over the Project. In addition to stamped and approved plans, Provider shall provide any required installation compliance confirmation letter(s) to any applicable Governmental Authorities.

Provider shall, upon the request of City, use reasonable efforts to assist the City in obtaining and retaining the City Permits, provided that the City shall reimburse Provider for reasonable and documented costs incurred by Provider in assisting the City under this Section.

D. Inspections. Provider and City shall work together reasonably to mutually select any company that performs inspections of the materials and equipment for the design, engineering, procurement, construction or installation of the Systems, including, but not limited to, any inspections to verify the Systems’ compliance with the Applicable Law.

E. Notice of Output Interruptions. Each Party shall notify the other Party as soon as reasonably practicable following its discovery of any material malfunction of any System or interruption in the supply of electricity from any System. Each Party shall designate and advise the other Party of personnel to be notified in the event of such a malfunction or interruption.

Provider shall correct, or cause to be corrected, the conditions that caused the malfunction or interruption as soon as reasonably practicable. However, in no event shall Provider’s response to investigate the problem and initiate appropriate corrective action be greater than forty-eight (48) hours following receipt of notice or upon discovery of such malfunction or interruption. In addition, Provider shall remotely monitor the System on a daily basis for the presence of alarm conditions and general performance utilizing the data acquisition systems and monitoring systems installed by the Provider at the Site, as described in Exhibit F.

F. Site Operations. In order to prevent any unreasonable disturbance or interruption of City activities, Provider shall accommodate the City’s normal operations schedule and scope of activities conducted on the Site during construction and on-going operation of the System pursuant to this Agreement. In the event Provider’s accommodation of the City’s normal operations schedule results in a delay to the Project Schedule (as defined below), such Project Schedule and the Commercial Operation Deadline (if applicable) shall be automatically and equitably extended.

G. Operation and Maintenance of System. Provider shall be responsible for all operations, maintenance, and repair of the System, except to the extent that any maintenance or repair is made necessary by the negligent acts or omissions or willful misconduct of City. All maintenance, repairs and operations, shall be conducted in the manner set forth in this Agreement, and Provider shall reasonably accommodate and cooperate with City to ensure the City’s activities, facility uses, and scheduling requirements are not unreasonably impeded. Provider’s repair work Packet Page 763 of 1189Attachment 2 Page 11 of 159

9 responsibilities shall include, but are not limited to, any repair required as a result of damage caused by the Provider or its contractors, subcontractors or vendors, to the City’s facilities within a period of five (5) years following the date the damage was discovered or reasonably should have been discovered by the City. Provider is responsible for repairs and/or replacement of system components that are damaged from vandalism, theft or criminal activity.

H. Prevailing Wages. This Project is subject to compliance with the prevailing wage provisions of the California Labor Code and the prevailing wage rate determinations of the Department of Industrial Relations. These rates are on file at City’s main office or may be obtained online at http// www.dir.ca.gov/dlsr . A copy of these rates shall be posted at the job site by Provider. Provider and all contractors and subcontractor(s) under it, shall comply with all applicable Labor Code provisions, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of this PPA and the employment of apprentices. Provider hereby agrees to indemnify and hold harmless City, their officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which City, their officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with any applicable Labor Code provisions arising out of or in connection with the Project.

1) Wages.

a. Pursuant to the provisions of Article 2 (commencing at Section 1770), Chapter 1, Part 7, Division 2 of the Labor Code of California, the governing body of City has ascertained the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of workmen needed to execute the Agreement.

b. Per Diem wages shall be deemed to include employer payments for health and welfare, pension, vacation, travel time and subsistence pay as provided in Labor Code § 1773.1 apprenticeship or other training programs authorized by Labor Code § 3093, and similar purposes when the term “per diem wages” is used herein.

c. Each worker needed to execute the work must be paid travel and subsistence payments as defined in the applicable collective bargaining agreements in accordance with Labor Code § 1773.1.

d. Holiday and overtime work when permitted by law shall be paid for at a rate of at least one and one-half times the above specified rate of per diem wages, unless otherwise specified.

e. Each worker in work on the System on City’s Property shall be paid not less than the prevailing wage rate, regardless of any contractual relationship which may be alleged to exist between Provider, or any subcontractors of Provider, and such workers.

Packet Page 764 of 1189Attachment 2 Page 12 of 159

10 f.Provider shall, as a penalty to the City, forfeit an amount as determined by the Labor Commissioner pursuant to Labor Code § 1775 for each calendar day, or portion thereof, for each worker paid less than the prevailing rate as determined by the director for such work or craft in which such worker is employed for any public work done under the contract by him or by any subcontractor under him.

The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by Provider. g. Any worker employed to perform work on the System which is not covered by any classification available in the City office, shall be paid not less than the minimum rate of wages specified for the classification which most nearly corresponds with work to be performed by him, and that minimum wage rate shall be retroactive to the time of initial employment of the person in the classification.
2)Record of Wages Paid: Inspection. Pursuant to Labor Code § 1776, Provider stipulates to the following:
a.Provider and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the Project. Such records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information of such forms. The payroll records may consist of payroll data that are maintained as computer records, if printouts contain the same information as the forms provided by the division and the printouts are verified as specified in subdivision (a) of Labor Code § 1776.
b.The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of Provider, or Provider’s subcontractors, on the following basis:
c.A certified copy of an employee’s payroll record shall be made available for inspection or furnished to such employee or his or her authorized representative. d.A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished to a representative of the City, and to the Division of Labor Standards Enforcement, and Division of Apprenticeship Standards of the Department of Industrial Relations. e.A certified copy of all payroll records enumerated in subdivision (a) shall be made available to the public for inspection or copies thereof, subject in all respects to subclause (g) below. However, a request by the public shall be made through either the City, the Division of Apprenticeship Standards, or the Packet Page 765 of 1189Attachment 2 Page 13 of 159

11 Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to the above, the requesting party shall, prior to being provided the records, reimburse the costs of preparation by Provider, subcontractors, and the entity through which the request was made. The public shall not be given access to such records at the principal office of Provider or Provider’s subcontractors.

f. Provider shall file, or caused to be filed, a certified copy of the records enumerated in subdivision (a) with the entity that requested such records within ten (10) days after receipt of the written request.

g. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, by the City, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual’s name, address and social security number. The name and address of Provider or subcontractors performing the work shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a joint labor-management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (Section 175a of Title 29 of the United States Code) shall be marked or obliterated only to prevent disclosure of an individual’s name and social security number. Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided non-redacted copies of certified payroll records.

h. Provider shall inform the City of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five (5) working days, provide a notice of a change of location and address.

i. In the event of noncompliance with the requirements of this Section, Provider shall have ten (10) days in which to comply subsequent to receipt of written notice specifying in what respects Provider must comply with this Section.

Should noncompliance still be evident after such 10-day period, Provider shall pay a penalty in the amount prescribed by statute to the City for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated.

Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from the progress payment then due.

j. The responsibility for compliance with this Section shall rest upon Provider.

3) Hours of Work.

Packet Page 766 of 1189Attachment 2 Page 14 of 159

12 a. As provided in Article 3 (commencing at Section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Provider stipulates that eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by Provider or by the work or upon any part of the work contemplated by this contract is limited and restricted to eight (8) hours during any one calendar day and forty (40) hours during any one calendar week, except as hereinafter provided. Notwithstanding the provisions herein, work performed on the City’s Property by employees of Provider or employees of any subcontractors of Provider in excess of eight (8) hours per day and forty (40) hours during any one week upon this public work shall be permitted provided that compensation for such employee of all hours worked in excess of eight (8) hours per day is not less than one and one-half times the basic rate of pay.

b. Provider shall pay to the City a penalty in the amount prescribed by statute for each worker employed in the execution of these Construction Provisions by Provider or by any Subcontractor for each calendar day during which such workman is required or permitted to work more than eight (8) hours in any calendar day and forty (40) hours in any one calendar week in violation of the provisions of Article 3 (commencing at Section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, unless compensation to the worker so employed by Provider is not less than one and one-half (1-1/2) times the basic rate of pay for all hours worked in excess of eight (8) hours per day.

c. Any work necessary to be performed after regular working hours, or on Sundays or other holidays shall be performed without additional expense to City, unless otherwise agreed to by the parties.

d. Construction work under the Construction Provisions shall be accomplished on a schedule consistent with the normal and reasonable practices of Provider and in compliance with applicable ordinances.

4) Apprentices.

a. All apprentices employed by Provider to perform services under these Construction Provisions shall be paid the standard wage paid to apprentices under the regulation of the craft or trade at which that apprentice is employed, and shall be employed only at the work of the craft or trade in which that apprentice is registered. Only apprentices, as defined in Labor Code § 3077, who are in training under apprenticeship standards and written apprenticeship agreements under Chapter 4 (commencing at Section 3070), Division 3 of the Labor Code, are eligible to be employed under these Construction Provisions.

The employment and training of each apprentice shall be in accordance with the provisions of the apprenticeship standards and apprenticeship agreements under which that apprentice is training.

Packet Page 767 of 1189Attachment 2 Page 15 of 159

13 b. When Provider to whom the work under these Construction Provisions is awarded by the City or any Subcontractor under Provider, in performing any of the work under the Construction Provisions, employs workers in any apprenticeable craft or trade, Provider and Subcontractor shall apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the Site of the public work, for a certificate approving Provider or Subcontractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected.

However, approval as established by the joint apprenticeship committee or committees shall be subject to the approval of the Administrator of Apprenticeship. Provider or subcontractors shall not be required to submit individual applications for approval to local joint apprenticeship committees provided they are already covered by the local apprenticeship standards. The ratio of work performed by apprentices to journeymen, who shall be employed in the craft or trade on the public work, may be the ratio stipulated in the apprenticeship standards under which the joint apprenticeship committee operates, but in no case shall the ratio be less than one hour of apprentice work for each five (5) hours of labor performed by a journeyman, except as otherwise provided in Section 1777.5 of the Labor Code. However, the minimum ratio for the land surveyor classification shall not be less than one apprentice for each five journeymen.

c. “Apprenticeable craft or trade” as used in Labor Code § 1777.5 and this Article, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the Apprenticeship Council.

d. Provider, or any Subcontractor which, in performing any of the work under this contract, employs journeymen or apprentices in any apprenticeable craft or trade and which is not contributing to a fund or funds to administer and conduct the apprenticeship programming of any craft or trade in the area of the Site of the public work, to which fund or funds other Providers in the area of the Site of the public work are contributing, shall contribute to the fund or funds in each craft or trade in which that Provider employs journeymen or apprentices on the public work in the same amount or upon the same basis and in the same manner as other Providers do, but where the trust fund administrators are unable to accept the funds, Providers not signatory to the trust agreement shall pay like amount to the California Apprenticeship Council. Provider or Subcontractor may add the amount of such contributions in computing their bid for the contract. The Division of Labor Standards Enforcement is authorized to enforce the payment of the contributions to the fund or funds as set forth in Labor Code § 227.The responsibility of compliance with Labor Code § 1777.5 and this Article for all apprenticeable occupations is with Provider.

e. The interpretation and enforcement of Sections 1777.5 and 1777.7 of the Labor Code shall be in accordance with the rules and procedures of the California Apprenticeship Council.

Packet Page 768 of 1189Attachment 2 Page 16 of 159

14 I. Safety Precautions and Programs. Provider shall ensure that its contractor and subcontractors performing work on the Site comply with the following safety precautions.

1) Provider's contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the construction and installation of the Systems, for maintaining all safety and health conditions on each site and for ensuring against and/or correcting any hazardous conditions on the site.

2) Certain work may be ongoing during City’s working hours; therefore, Provider's contractor shall take precautions to prevent injury and in accordance with the City’s guidelines for onsite safety. Material storage and vehicle access and parking shall be subject to City approval. In the event City’s failure to approve or failure to timely approve results in a delay to the Project Schedule (as defined below) or otherwise delays Provider’s satisfaction of any obligations hereunder, the Project Schedule, the Commercial Operation Deadline (if applicable), and any other applicable schedule of Provider shall be automatically and equitably extended and the City shall reimburse Provider for any reasonable or documented costs and expenses incurred in finding alternative locations.

3) The use of alcohol, drugs, or tobacco will not be permitted on City property.

Workers employed by Provider's contractor or subcontractors. All workers will present themselves with appropriate language, actions and work wear while on construction site and follow requirements from City for interaction with City’s stakeholders.

4) Provider's contractor shall designate a responsible member of its organization at the Site whose duty shall be the prevention of accidents and overall jobsite safety for contractor/subcontractor employees and visitors.

J. Conduct of Project Construction, Installation, Alteration, Operation, Repair, Maintenance and Removal. Throughout the Term of this Agreement, all work of construction, installation, alteration, operation, repair, maintenance and removal of the Projects shall conform with the following:

1) Provider shall not leave debris under, in, or about the Site, but shall promptly remove same from the Site and dispose of it in a lawful manner.

2) Provider shall promptly remove all rubbish and debris left by Provider or Subcontractor during the period of its active activities at the Site.

3) When performing activities at a Site, Provider shall enclose the working area with temporary fencing. If the Site is operated by a school, the fencing shall be adequate to keep students out of the work area and physically segregated from any and all workers on or about the Site. Provider shall coordinate with City’s designated contact to develop a mutually agreeable schedule for any activity at the Site to Packet Page 769 of 1189Attachment 2 Page 17 of 159

15 mitigate any inconvenience to or disruption of students, faculty, and staff in their regular activities and to otherwise eliminate any substantial interference with normal operations of the Site.
4)Provide fencing and/or demarcations around any shrubs or trees indicated to be preserved, provided that such indication is provided in writing by City to Provider prior to initiation of any installation or construction work by Provider, sufficient to protect such foliage from substantial damage that might ordinarily occur during activities of the kind undertaken by Provider at the Site. 5)Deliver personnel, tools, equipment and materials to the work area over route(s) reasonably designated by the City, provided that City ensures that Provider shall have all access rights necessary to use such designated routes. 6)Take commercially reasonable measures to mitigate objectionable dust, noise, or other disturbances as necessary to ensure Provider’s activities do not result in substantial interference with or disruption of regular Site activities and normal operations of the Site.
7)Confine apparatus, the storage of materials, and the operations of workers to limits indicated by law, ordinances, permits or the reasonable directions of the City, not unreasonably encumber Site or overload any structure with materials, enforce all reasonable instructions of the City regarding signs, advertising, fires, and smoking and require that all workers comply with all City’s regulations while on the Site. 8)Upon completion of activities on the Site, Provider shall remove temporary utilities, fencing, barricades, planking, sanitary facilities and all similar temporary facilities from Site.
9)Provider shall remain strictly liable to City for all damages to City's property caused or contributed to by Provider, its employees and/or agents and shall, upon written demand by City, restore all City property damaged by Provider, its employees and/or agents to substantially the condition in which it was prior to said damage occurring at the sole cost and expense of Provider, excepting ordinary wear and tear.

6.Commercial Operation Date; Conditions Precedent; Notice to Proceed.

A.City Conditions Precedent to Construction. City’s obligations under this Agreement are conditioned on the completion of the following pre-construction activities relating to the System (“City Conditions Precedent”), or the City’s written waiver of such conditions, within one hundred and eighty (180) days after the Effective Date ("Conditions Precedent Deadline”):
1)Provider shall have completed all design and engineering of the System(s) in accordance with the requirements of Article 5, above, including, without limitation, Packet Page 770 of 1189Attachment 2 Page 18 of 159

16 having obtained all necessary approvals, Provider Permits and entitlements precedent to construction or installation.

2) Provider shall submit to City certificates of insurance and endorsements demonstrating compliance with the requirements defined in Section 17 of this Agreement and carriage of workers’ compensation insurance.

3) Provider shall submit to City the certificates in a form provided by City regarding compliance with statutory student safety (if applicable), tobacco use and drug use.

4) Provider shall submit to City a fully executed copy of any and all contracts entered into for the engineering, procurement and/or construction of the System, provided Provider may redact confidential and commercial information.

5) Provider shall submit to City for approval a 90% completed design of the System, a detailed construction and installation schedule (such schedule as may be updated or amended, the “Project Schedule”) and a detailed project safety plan. Provider’s construction and installation schedule shall include start and completion dates for all categories of work on the Site, including but not limited to pre-construction activities, installation of major equipment and anticipated Site deliveries and all required submittal and procurement documentation.

6) Provider shall confirm to City that Provider has obtained and secured sufficient financing to fund Provider’s obligations under this Agreement.

B. Provider Conditions Precedent to Construction. Subject to Provider’s commercially reasonable efforts, Provider’s obligations under this Agreement are conditioned on the completion of the following conditions (“Provider Conditions Precedent”) to Provider’s reasonable satisfaction, or Provider’s written waiver of such conditions, on or before the Conditions Precedent Deadline:

7) The City shall submit evidence to Provider, in form and substance reasonably acceptable to Provider, that the City has obtained or caused to be obtained all City Permits.

8) Provider has determined, in accordance with standard industry practices, that there do not exist site conditions (including environmental conditions) or construction requirements that were not known as of the Effective Date and that could reasonably be expected to materially increase the cost of installation, operation and maintenance of the Solar Facility or Battery System or would adversely affect the sale and delivery of Solar Facility Output and Battery Systems Output to the City as designed.

9) Provider has determined, in accordance with standard industry practices, that the Site, as is, is sufficient to accommodate the System and suitable for construction and operation of the Solar Facility and Battery System.

Packet Page 771 of 1189Attachment 2 Page 19 of 159

17 10) The City shall transfer the Distribution Utility’s approved interconnection application to the Provider and Provider has determined, in accordance with standard industry practices, that interconnection services will be available with respect to energy generated by the Solar Facility. Provider shall take over the responsibility of managing the interconnection application originally submitted by the City to the Distribution Utility and undertake all commercially reasonable efforts to assess the capacity of the Distribution Utility facilities, including, but not limited to, the applicable transformer(s) and conductor(s) and provide a written assessment of such to City.

11) Provider has determined, in accordance with standard industry practices, that there has not occurred a material adverse change in the regulatory environment, incentive program or federal or state tax code that could reasonably be expected to adversely affect the economics of the installation for Provider.

C. Completion of Condition Precedent to Construction; Termination. If Provider is unable to timely complete any of the City Conditions Precedent by the Conditions Precedent Deadline, City may, but is not required to, either (i) waive or extend such requirements in a written notice to Provider; or (ii) terminate this Agreement without triggering the default provisions of this Agreement, including, but not limited to any default provision requiring the payment of the Termination Value, nor shall any such termination subject City to any other liability. If Provider is unable to complete or confirm, as applicable, any of the Provider Conditions Precedent by the Conditions Precedent Deadline, Provider may, but is not required to, either (i) waive such requirement in a written notice to City; or (ii) terminate this Agreement without triggering the default provisions of this Agreement and receive a reimbursement of fifty percent (50%) of the Development Cost paid by Provider to City as of such termination date. Upon the satisfaction of all City Conditions Precedent and Provider Conditions Precedent, and written confirmation from Provider of the same, City shall issue a notice to proceed to Provider (“Notice to Proceed”) within ten (10) business days, informing Provider that it may commence the construction of the System on the Site. Provider shall not proceed with construction of the System until it has received the Notice to Proceed. Upon City’s reasonable request, Provider shall promptly provide City with copies of any requested forms, documents and communications received or generated by Provider in connection with this Agreement.

D. Construction; Commercial Operation. Promptly upon receipt of the Notice to Proceed to construction from City, Provider shall commence construction of the System, and shall cause complete installation and start-up of Commercial Operation thereof on or before the date as indicated in Attachment C in Exhibit F (the “Commercial Operation Deadline”). The Commercial Operation Deadline shall be on or prior to the net energy metering (NEM) interconnection deadline of the Distribution Utility which is set for April 1, 2026. Prior to declaring Commercial Operation, Provider shall achieve the following:

1) Effect the execution, in coordination with City, of all agreements required for interconnection of the System with the Distribution Utility, including, without limitation, the Interconnection Agreement and net metering agreement if applicable; and
Packet Page 772 of 1189Attachment 2 Page 20 of 159

18 2) Ensure that all necessary connections and equipment are installed in compliance with all applicable codes and standards, and that Provider has procured or caused the complete installation of all necessary equipment and protection devices to enable delivery of Solar Facility Output and the Battery Systems Output from the Delivery Point to City’s facilities.

3) Obtain or cause to be obtained all necessary Permits, entitlements, contracts and agreements required for the operation and maintenance of the System and the sale and delivery of Solar Facility Output and the Battery Systems Output to City.

4) Provide written confirmation that (i) all required commissioning has been completed; (ii) City and its agents have been provided access to the monitoring data for the System at the level required by this Agreement; and (iii) all closeout activities outlined in Section 7 of Exhibit F have been completed.

E. Commercial Operation. The “Commercial Operation Date” shall be the date on which Provider accurately notifies City of the fact that the System is mechanically and electrically complete and operational and providing Solar Facility Output and Battery Systems Output through the Meter(s) to the Delivery Point under approved and executed Distribution Utility Interconnection Agreement and that Provider has met all of the requirements in Section 6(D) above. Provider shall cause the Commercial Operation Date to occur on or before the Commercial Operation Deadline.

Provider shall be solely liable to City for any delay by Provider or Provider’s contractor(s) in completing the work, including any costs of City associated with impacts to the Site or a delay in the Commercial Operation Date.

If Commercial Operation has not commenced on or before the thirtieth (30th) day following the Commercial Operation Deadline (as may be extended as provided herein), City may, but shall not be required to, assess Delay Liquidated Damages against Provider in an amount equal to $300 per Day. If Commercial Operation has not commenced on or before the ninetieth (90th) day following the Commercial Operation Deadline, City may, but shall not be required to, terminate this Agreement without triggering the default provisions of this Agreement as to City or any other City liability, including any default provision which would otherwise require payment of the Termination Value, provided that the City shall not terminate this Agreement if the City determines, in its reasonable discretion, that Provider continues to diligently pursue, using commercially reasonable efforts, the achievement of Commercial Operation.

The cost to City for administration, inspection, mileage, and other similar items would be extremely difficult to determine. For that reason, additional liquidated damages, known as Administrative Delay Liquidated Damages may also be applied to compensate City for undue delays in the completion of punch list items, Final Binder (as defined in the General Conditions and Technical Specifications attached hereto as Exhibit F), site clean-up, and demobilization, after Commercial Operation has been achieved. Provider shall complete site clean-up and demobilization within thirty (30) days of Commercial Operation Date. At any time after the Packet Page 773 of 1189Attachment 2 Page 21 of 159

19 expiration of such 30-day period, the City shall provide written notice to Provider of any outstanding work the City reasonably determines Provider must complete. If Provider has not cured such issues within fifteen (15) days of receipt of such notice (as shall be extended by an additional fifteen (15) days if Provider is diligently pursuing such cure), Administrative Delay Liquidated Damages shall be imposed in the amount of $250 per day. Charges will be assessed until City reasonably agrees that all outstanding work has been completed.

F. Extension of Commercial Operation Deadline. Provider may request in writing an extension of the Commercial Operation Deadline. At the time of the request, Provider shall present City in writing with the reason for delay, confirmation that Commercial Operation shall commence within the requested extension time as well as evidence demonstrating that the delay in achieving the Commercial Operation Deadline could not have been reasonably avoided by Provider.

Provider’s written request must also state the date on which Provider reasonably believes Commercial Operation will be achieved following such extension. The approval of the request will be at the sole discretion of City and if approved by City, Provider shall pay to City a non-refundable extension fee of $350 for each request, provided that no extension fee shall be payable and the Commercial Operation Deadline shall automatically be extended by one day for each day of delay caused by: (i) a Force Majeure event, (ii) any action of the City that directly caused such delay (including but not limited to pursuant to Sections 5.F and 5.I above), or (iii) any delay by City in obtaining the City Permits before June 1, 2024. To the extent that Provider fails to meet the Commercial Operation Deadline as automatically extended or extended by City pursuant to this Section, City shall have the options to terminate or assess liquidated damages as set forth in subsection D above.

7. Ownership of System, Output, Green Attributes and Environmental Financial Incentives.

A. Ownership of System. Title to the System shall remain with Provider during the Term unless and until City exercises its option to purchase the System as set forth herein. None of the System, including, but not limited to any components thereof may be sold, leased, assigned, mortgaged, pledged or otherwise alienated or encumbered by City. City shall not cause or permit the System or any part thereof to become subject to any lien, encumbrance, pledge, levy or attachment arising by, under or through City. If there is any mortgage or fixture filing against the Site which could reasonably be construed as attaching to the System as a fixture of the Site, City shall provide or procure, at Provider’s request, a disclaimer, release or subordination and non- disturbance agreement from such lien holder. City shall not unreasonably withhold consents to the filing by Provider, on behalf of City, of a disclaimer of the System as a fixture of the Site in the office where real estate records are customarily filed in the jurisdiction of the Site. Provider shall bear all risk of loss with respect to the System, except for losses arising from the negligence or willful acts or omissions by City, or their agents or employees. Provider shall be solely responsible for the System operation and maintenance in compliance with all applicable laws, regulations and Permits. Provider shall not be responsible for the cost or expense of any maintenance required as a direct result of City’s negligence or willful misconduct.

B. Ownership of Output, Green Attributes and Environmental Financial Incentives.

Provider is the exclusive owner of any Environmental Financial Incentives associated with the Packet Page 774 of 1189Attachment 2 Page 22 of 159

20 construction, ownership and operation of the System. City will assign its interest (if any) in all such credits and other financial incentives to Provider. City is the exclusive owner of, and may assign or sell in its sole discretion, all Green Attributes, including, but not limited to, Renewable Energy Certificates (“REC”), and REC Reporting Rights, attributable to the System and the Solar Facility Output or Battery Systems Output therefrom. Without additional charge to City, Provider shall take and bear the costs of all steps necessary to secure and perfect City’s interest in the Green Attributes, including, but not limited to, registering the RECs with WREGIS. The Parties agree to subsequently negotiate in good faith the ownership of any additional benefit or incentive associated with this Agreement which did not exist at the time this Agreement was entered into.

8. Payment.

A.Monthly Invoices. Provider shall provide an invoice for the System to City on a monthly basis, by the 15th day of each calendar month following the Commercial Operation Date of the System. Each invoice will set forth (i) the Solar Facility Output and/or Battery Systems Output delivered in the preceding month, (ii) the Power Price for such month, (iii) the total amount to be paid by City to Provider for Solar Facility Output and/or Battery Systems Output delivered in the preceding month, (iv) the year and month of the PPA term, (v) Annual Production Estimate for the relevant year as set forth in Exhibit B, (vi) running total of Annual Production Estimate for the relevant year as set forth in Exhibit B versus cumulated actual Output for the relevant year, (vii) running total of Battery Systems Guarantee for the relevant year as set forth in Exhibit C versus cumulated actual Battery Systems Output for the relevant year (viii) and any applicable offsets or credits to such invoice amounts.

B.Due Date. All payment of invoices shall be in U.S. Dollars and paid by wire transfer, check, or automated check handling (ACH) payment delivered to Provider at the address specified herein within forty-five (45) Days of the date the invoice is received by City (“Due Date”). If the Due Date is a weekend or a bank holiday, payment will be due the next following business day.

C.Payment Disputes. In the event a Party disputes all or a portion of an invoice, or any other claim or adjustment arises, such disputes shall be resolved pursuant to Section 15.

9.Purchase Option.

A.Purchase of System. Unless City is in default of its obligations under this Agreement, City shall have the option to purchase all of Provider’s right, title, and interest in and to the System on (i) the seventh (7th) anniversary of the Commercial Operation Date and on each anniversary of the Commercial Operation Date thereafter, (ii) upon expiration of the Term hereof, or (iii) as otherwise provided herein (“Purchase Option”). If City wishes to exercise its Purchase Option, it must provide notice to Provider at least ninety (90) Days in advance of any such anniversary or the expiration of the Term. The purchase price shall be the greater of (i) the Fair Market Value, as defined under this Agreement, of the System as of the applicable anniversary date or the expiration of the Term or (ii) the Termination Value for the year in which the Purchase Option is exercised (the “Purchase Price”). Upon the exercise of the Purchase Option and Provider’s receipt of all amounts then owing by City under this Agreement, including any incentive or depreciation recapture, the Parties will execute all documents necessary for the purchase and Packet Page 775 of 1189Attachment 2 Page 23 of 159

21 sale of the System, including but not limited to, the delivery of the Purchase Price, the transfer of title to the System, and to the extent transferable, the remaining period, if any, on all warranties and Green Attributes for the System to City. Provider shall remove any encumbrances placed or allowed on the System by Provider. On the date on which Provider transfers title to the System to City in accordance with this Section, this Agreement shall terminate without default or penalty to City.

B.Fair Market Value. The “Fair Market Value” of the System shall be the value thereof as determined by a nationally recognized independent appraiser selected by the Parties, with experience and expertise in the solar photovoltaic and battery energy storage industry to value such equipment. The Fair Market Value of the System shall be based upon its fair market value in continued use for the Term, taking into account, among other things, the age, condition and performance of the System and advances in solar technology, provided that installed equipment shall be valued on an installed basis, shall not be valued as scrap if it is functioning and in good condition and costs of removal from a current location shall not be a deduction from the valuation, taking into account the present value of all associated future income streams expected to arise from the operation of the System for the remaining useful life of the System, including but not limited to the expected price of electricity. The appraiser will consider the loss of all Environmental Financial Incentives or any other tax benefits related to the System, and including the costs of removal, shipping and reinstallation, as a cost credit against the value of the System. The valuation made by the appraiser shall be binding on the Parties in the absence of fraud or manifest error.

The costs of the appraisal shall be borne by the Parties equally. If the Parties are unable to agree on the selection of an appraiser, such appraiser shall be selected by the two appraiser firms proposed by each Party.

10. Early Termination.

A.Provider’s Early Termination Rights. Provider shall have the right, but not the obligation, to terminate this Agreement without triggering the default provisions of this Agreement or any liability under this Agreement prior to expiration of its Term upon the occurrence of:
1)An unstayed order of a court or administrative agency, or a change in state or federal law or regulation (a “Change in Law”), imposing a material cost, regulation or other requirement upon the sale of Solar Facility Output or Battery Systems Output which precludes the Provider from providing Solar Facility Output or Battery Systems Output pursuant to this Agreement. Provider shall notify City of any such Change in Law, and within thirty (30) days following receipt by City of such notice, the Parties shall meet and attempt in good faith to negotiate such amendments to this Agreement as are reasonably necessary to preserve the economic value of this Agreement to both Parties. If the Parties are unable to agree upon such amendments within such 30-day period, then either Party may terminate this Agreement. 2)Condemnation, destruction, or other material damage to the Site that results in the termination of the easement to such Site.

In the event Provider exercises its right under this Section, City may elect to either (i) purchase the System pursuant to Section 9 as of the time of Provider’s notice; or (ii) require Packet Page 776 of 1189Attachment 2 Page 24 of 159

22 Provider to remove the System within one hundred eighty (180) days at Provider’s sole cost and expense and restore the Site as required in Section 3.

B. City’s Early Termination Rights. If City ceases to conduct operations at or vacates a Site, City may, upon payment to Provider of the Termination Value and of all amounts then owing by City under this Agreement, net of amounts or receivables then owed to City by Provider, without further penalty hereunder, terminate this Agreement. Provider shall remove the System at the Site in accordance with Section 3.

11. Delivery; Risk of Loss; Relocation.

A. Output Specifications. Provider shall ensure that all energy generated and / or discharged by the System conforms to Distribution Utility specifications for energy being generated and / or discharged and delivered to the electric distribution systems of the Site, which shall include the installation of proper power conditioning and safety equipment, submittal of necessary specifications, coordination of Distribution Utility testing and verification, and all related costs.

B. Transfer of Output. Provider shall be responsible for the delivery of Solar Facility Output and Battery Systems Output to the Delivery Point. Provider shall undertake all commercially reasonable efforts to assess the capacity of the Distribution Utility transformer(s) and conductor(s). To the extent any subsequent upgrade to such facilities is required and not performed and funded by the Distribution Utility, the Provider shall cause such upgrades to be completed at its sole cost and expense, subject to adjustment of the Power Price as contemplated by Exhibit B. Title and risk of loss of the Solar Facility Output and Battery Systems Output shall pass from Provider to City upon delivery of the Solar Facility Output and Battery Systems Output to the Delivery Point. To the extent applicable to the Project, prior to the start of construction of the System, Provider shall use commercially reasonable efforts to assist with City’s selection of equipment installations on City’s side of any Delivery Point.

C. Relocation. On or after the seventh (7th) anniversary of the Commercial Operation Date, City may, at its option, require that the System be permanently relocated, either on the existing Site or to another site of City’s choosing, at a location with at least equal insolation to the existing Site and reasonably acceptable to both Parties (the “Relocation Site”). City shall give Provider at least sixty (60) calendar Days’ notice of City’s need to move or relocate the System.

Following agreement on a Relocation Site, the Parties will amend this Agreement to memorialize the required changes in the definition of “Site.”

City shall pay the reasonable costs arising in connection with the relocation of the System, including removal costs, necessary storage costs, re-installation, re-commissioning costs, and any applicable interconnection fees, provided that Provider provides City with information detailed herein below in a timely manner. City shall additionally compensate Provider for any revenue during the period in which energy cannot be generated and delivered to City from the System being relocated, at City Suspension Rate, as defined below, prorated as needed to apply on a daily basis.

City shall also execute such consents or releases reasonably required by Provider or Provider’s financing Parties in connection with the relocation. Within thirty (30) Days of agreement on a Packet Page 777 of 1189Attachment 2 Page 25 of 159

23 Relocation Site, Provider will provide City with a calculation of the estimated time required for such relocation, and the total anticipated amount of lost revenues and additional costs to be incurred by Provider as a result of such relocation. City will have twenty (20) Days to review the calculation and make, in writing, any objections to the calculation. Provider shall make all commercially reasonable efforts to achieve the relocation of the System in the estimated time and for the estimated cost provided to City. All additional time and / or costs shall require advance written approval of City.

If an acceptable Relocation Site cannot be located, this Agreement shall terminate with respect to the Site, upon Provider’s thirty (30) Days’ written notice. In the event that an acceptable Relocation Site cannot be agreed upon, City shall pay Provider an amount equal to the Termination Value. In the event of a termination occurring under this Section, Provider shall remove the System and restore the Site in accordance with Section 3, at no additional cost to City.

D.Temporary Suspension by City. Notwithstanding any other provision of this Agreement, City shall have the right, upon written notice to Provider, to temporarily suspend operations and Solar Facility Output and/or Battery Systems Output for any reason. City shall have the right, upon written notice to Provider, to temporarily render the System non-operational for up to forty-eight (48) hours per year without penalty or charge by Provider. If City requires temporary suspension of the System for more than forty-eight (48) hours in a given year, City shall pay to Provider an amount, prorated as necessary, equal to the amount of the monthly payment for power purchased pursuant to this Agreement for the same month(s) (or portion thereof) in the preceding twelve (12) months, or for the average of the entire period the System has been in Commercial Operation if less than twelve (12) months, for the period of time during which the System is not in Commercial Operation in excess of forty-eight (48) hours (“City Suspension Rate”) due to the temporary suspension by City.

E.Temporary Suspension by Provider. Provider shall have the right, upon written notice to City, to temporarily render the System non-operational for up to forty-eight (48) hours per year without penalty or charge by City. If Provider renders the System non-operational for a period in excess of forty-eight (48) hours, Provider shall pay to City a monthly payment (prorated as needed) equal to the difference between the cost to the City of purchasing energy for the combined services of the Distribution Utility and City during the System’s period of non-operation and the average monthly cost of power purchased under this Agreement for the preceding twelve (12) months, or for the entire period the System have been in Commercial Operation if less than twelve (12) months, for the period of time during which the System are non-operational.

If an Outage occurs under this Section and a payment is due from Provider to City, Provider shall include in its next invoice(s) to City (and in the final invoice for any credit owed for the final Contract Year) a credit for the difference between the electricity cost as provided by the Distribution Utility to City for the applicable period.

F.[RESERVED]
G.Change in Conditions. If City requests an increase in the Solar Facility Output or Battery Systems Output delivered to the Delivery Point, the Parties agree to use good faith efforts Packet Page 778 of 1189Attachment 2 Page 26 of 159

24 to increase such capacity and to negotiate such amendments to this Agreement as are reasonably necessary to reflect the economic value of such increased capacity. If Provider and City are not able to reach an agreement for such additional Solar Facility Output or Battery Systems Output, City may, at its sole discretion, obtain the services of a third party for such purposes, provided that such additional third party provided services and any site easement shall not interfere with Provider’s right, title and interest in the System under this Agreement.

H. Performance and Payment Bonds. Provider shall deliver to City evidence that the prime contractor performing the construction and installation services of the Systems maintains payment and performance bonding in favor of the Provider and meeting the following requirements, which shall be provided to the City prior to the commencement of construction on any Site:

a. Performance Bond. A bond issued by a corporate surety authorized to issue surety insurance in California, in a form commonly used for such purposes, in an amount equal to one hundred percent (100%) of the Provider’s construction contract price payable under the contract securing the faithful performance of the contractor of its contract with Provider; and
b. Payment Bond. A bond issued by a corporate surety authorized to issue surety insurance in California, in a form commonly used for such purposes, in an amount equal to one hundred percent (100%) of Provider’s construction contract payable under the contract securing the payment of all claims for the performance of labor or services on, or the furnishing of materials for, the performance of the contract. c. All bonds shall be provided by a corporate surety authorized and admitted to transact business in California and shall be in the form provided by City.

I. Provider shall make no alteration to the System after the Commercial Operation Date intended or reasonably anticipated to permanently increase the nameplate capacity, Solar Facility, or Battery Systems Output of the System without express written approval by City. Notwithstanding the foregoing, Provider may alter the System’s nameplate capacity on a temporary basis when performing maintenance and repair activities provided that Provider returns the System’s nameplate capacity to that as of the Effective Date upon the completion of such activities.

12. Metering.

A. Meter. Provider shall provide and maintain standard revenue grade meters and an electronic data acquisition system at the Delivery Point (each a “Meter”, collectively “Meters”) to individually measure the actual amount of electricity supplied to City by each of the Solar Facility and the Battery Systems on a continuous basis. Meters shall be installed and maintained at Provider’s sole expense and shall be located in close proximity to the Delivery Point and in all cases on the Provider side of all Provider owned transformers and other electrical losses.

B. Meter Testing. Provider shall arrange for all Meters to be tested prior to Commercial Operation and once per year after Commercial Operation within thirty (30) days of Packet Page 779 of 1189Attachment 2 Page 27 of 159

25 the anniversary of the Commercial Operation Date. The tests shall be conducted by independent third parties who are qualified to conduct such tests. Provider shall bear all costs and expenses associated with annual Meter testing. City shall be notified ten (10) Days in advance of such tests and shall have a right to be present during such tests. Provider shall provide City with the detailed results of all Meter tests.

In addition, the Meters shall be inspected and tested for accuracy at such other times as City may reasonably request, but in no event more than once every six (6) month period. City shall bear the cost of the additionally requested Meter testing, unless such test shows that a Meter was inaccurate by more than two percent (2%), in which case the Provider shall bear the Meter testing costs.

C.Cost of Meter Repair. If the Meter testing demonstrates that a Meter was operating outside of its allowable calibration (+/- 2%), then the Provider will pay for the cost of the repairs, or replacement, necessary to restore a Meter to proper working order. If a Meter is found to be inaccurate by more than two percent (2%), Invoices from the prior six (6) months, or from the last time such Meter was registering accurately, whichever is less, shall be adjusted in accordance with Section 8, except that City shall not be obligated to pay interest on any amount found to be due because Meter was operating outside of its allowable calibration (+/- 2%). Provider shall submit any request for an adjustment to City no later than two (2) months after Meter testing had been performed, and City shall not be obligated to pay any adjustment for a prior fiscal year that was not submitted to City within two months after Meter testing was performed. City may withhold payments to Provider if a Meter has registered production in excess of 2% of the Solar Facility Output or Battery Systems Output delivered to City and Provider fails to provide City with the appropriate payment pursuant to Section 8 for the amount which City overpaid to Provider as a result of the Meter being outside of the established calibration range.

D.Meter Data. Provider shall gather and maintain the data from a Meter, including but not limited to interval data registered at least once every fifteen (15) minutes (the “Meter Data”) and shall make such Meter Data available to City or maintain the Meter Data such that City can access the Meter Data remotely through a secure internet site or such other remote access as the Parties mutually agree to.

E.Meter Data Audit. City shall have the right to audit the Invoices and/or the Meter Data once per calendar year. If the audit reveals that City has been overcharged by more than two percent (2%), Provider shall bear the cost of such audit, but in all other cases City shall bear the cost of such audit.

F.Maintenance of Meter Data. The Parties shall maintain all records related to Invoices and Meter Data for a period of the greater of (i) forty-eight (48) months from the date of such Invoice or Meter Data, or (ii) as otherwise required by law. Such records shall be available for audit as described above.

13. Representations, Warranties and Covenants.

A.Authorization and Enforceability. Each Party represents to the other Party as of the Effective Date that: (i) such Party is duly organized, validly existing and in good standing under Packet Page 780 of 1189Attachment 2 Page 28 of 159

26 the laws of the state of its formation; (ii) the execution and delivery by such Party of, and the performance of its obligations under, this Agreement has been duly authorized by all necessary action, does not and will not require any further consent or approval of any other Person, and does not contravene any provision of, or constitute a default under such Party’s organizational documents, any indenture, mortgage or other material agreement binding on such Party or any valid order of any court, or regulatory agency or other body having authority to which such Party is subject; and (iii) this Agreement constitutes the legal and valid obligation of such Party, enforceable against such Party in accordance with its terms, except as may be limited by bankruptcy, reorganization, insolvency, bank moratorium or similar laws relating to or affecting creditors’ rights generally and general principles of equity, whether such enforceability is considered in a proceeding in equity or at law.

B.Insolation. City agrees that access to sunlight (“Insolation”) is essential to Provider’s ability to provide the projected Solar Facility Output and is a material inducement to Provider in entering into this Agreement. Accordingly, City shall not permit any interference with Insolation available to the System. If City becomes aware of any potential development, foliage or trees, or other activity on adjacent or nearby properties that will diminish the Insolation to the System, City shall advise Provider of such information and reasonably cooperate with Provider in reasonable measures taken by Provider in an attempt to preserve existing levels of Insolation upon the System.

C.Notice of Damage. Each Party shall promptly notify the other Party of any matters it is aware of pertaining to any damage to or loss of the use of the System or that could reasonably be expected to adversely affect the System.

D.Site Owner. The City represents and warrants to Provider that the City is the sole owner of the Site and holds fee title to the Site.

14.Default and Remedies.

A.Events of Default. In the event of a Party’s breach of any performance obligation hereunder or breach of any representation, warranty, covenant or term of this Agreement, the non- defaulting Party shall provide the defaulting Party with written notice of the default, which notice shall describe the default in reasonable detail. Following the date of receipt of written notice of default, the defaulting Party shall have thirty (30) Days to cure any payment default and forty-five (45) days to cure any other breach or default described in this Agreement; provided, however, that with respect to non-payment defaults, the cure period shall be extended by the number of days (not to exceed an additional ninety (90) Day period) during which an event of Force Majeure is occurring or during which the defaulting Party has begun corrective action and continues to diligently pursue, using commercially reasonable efforts, the completion of such corrective action.

B.Event of Default. In addition to the foregoing, with respect to a Party, there shall be an event of default (each an “Event of Default”) if:
1)solely with respect to the City, the City terminates, amends, suspends or there is otherwise a change to the right, title and interest of Provider in the Easement; 2) such Party fails to timely pay any amount due;
Packet Page 781 of 1189Attachment 2 Page 29 of 159

27 3) such Party concedes in writing to its inability to pay its debts generally as they become due;

4) such Party files a petition seeking reorganization or arrangement under the federal bankruptcy laws or any other applicable law or statute of the United States of America or any State, City or territory thereof;

5) such Party makes an assignment for the benefit of creditors in connection with bankruptcy proceedings;

6) such Party consents to the appointment of a receiver of the whole or any substantial part of its assets;

7) such Party has a petition in bankruptcy filed against it, and such petition is not dismissed within sixty (60) Days after the filing thereof;

8) a court of competent jurisdiction enters an order, judgment, or decree appointing a receiver of the whole or any substantial part of such Party’s assets, and such order, judgment or decree is not vacated or set aside or stayed within sixty (60) Days from the date of entry thereof;

9) under the provisions of any other law for the relief or aid of debtors, any court of competent jurisdiction shall assume custody or control of the whole or any substantial part of such Party’s assets and such custody or control is not terminated or stayed within sixty (60) Days from the date of assumption of such custody or control;

10) such Party ceased its legal existence or ceases doing business or otherwise dissolves; or

11) such Party breaches a material term of this Agreement.

C. Provider Remedies. If an event of default by City under Sections 14(A) or 14(B) has occurred and is continuing, then following the expiration of any applicable cure period, Provider may at its discretion: (i) suspend performance under this Agreement, (ii) seek specific performance from a court of appropriate jurisdiction pursuant, and/or (iii) terminate this Agreement, and as Provider’s sole and exclusive remedy in connection with such termination, require City to pay to Provider as liquidated damages, and not as a penalty, the Termination Value for the System, and any and all amounts then owed Provider for Solar Facility Output or Battery Systems Output delivered to City as of the date of such termination pursuant to this Agreement.

In the event of such termination, Provider shall remove the System in accordance with Section 3, at Provider’s sole cost and expense.

D. City Remedies. If an event of default by Provider under Sections 14(A) or 14(B) has occurred and is continuing, then following the expiration of any applicable cure period, City Packet Page 782 of 1189Attachment 2 Page 30 of 159

28 may at its discretion: (i) suspend performance under this Agreement, (ii) seek damages or specific performance from a court of appropriate jurisdiction, and/or (iii) terminate this Agreement. In the event that City terminates this Agreement pursuant to this Section, City may elect to either (i) purchase the System pursuant to Section 9 as of the time of the event of default; or (ii) require Provider to remove the System within one hundred eighty (180) Days at Provider’s sole cost and expense and restore the Site as required in Section 3.

15.Dispute Resolution.

The Parties agree to make a good faith attempt to resolve any and all controversies, claims, disagreements, or disputes between the Parties arising out of or related to this Agreement (“Dispute”). In the event of any Dispute, either Party may give notice of the dispute to the other Party. In the event a Party Disputes all or a portion of an invoice or other payment, the disputing Party shall timely pay any undisputed portion of such amount due. The Parties shall first use good faith, reasonable, diligent efforts to resolve the dispute within ninety (90) Days from the date of such notice. If the Parties do not resolve their dispute within ninety (90) Days of notice, then the Parties may, upon mutual agreement, submit to mediation before a mutually agreed upon mediator.

In the event the dispute is not resolved through mediation, the Parties may pursue their legal rights through any other legally permissible means. If a Dispute, or any portion thereof, remains unresolved after applicable dispute resolution requirements, the Provider shall comply with all claims presentation requirements as provided in Chapter 1 (commencing with section 900) and Chapter 2 (commencing with section 910) of Part 3 of Division 3.6 of Title 1 of Government Code as a condition precedent to the Provider’s right to bring a civil action against City. For purposes of those provisions, the running of the time within which a claim must be presented to City shall be tolled from the time the Provider submits its written Dispute until the time the Dispute is denied, including any time utilized by any applicable meet and confer process. Pending resolution of the dispute, Provider and its subcontractors shall continue to perform the work under the Agreement and shall not cause a delay of the work during any dispute, claim, negotiation, mediation, or arbitration proceeding, except by written agreement of City.

16. Taxes; Liens.

A.Taxes. Provider shall pay any income taxes imposed on Provider due to the sale of energy under this Agreement. City shall pay all real property taxes and assessments applicable to the Site. This Agreement may result in the creation of a possessory interest (Rev. & Tax. Code § 107.6). If such a possessory interest is vested in Provider, Provider may be subjected to the payment of personal property taxes levied on such interest in the System. Provider shall be responsible for the payment of, and shall pay before becoming delinquent, all taxes, assessments, fees, or other charges assessed or levied upon Provider, the Project and the System. Provider further agrees to prevent such taxes, assessments, fees, or other charges from giving rise to any lien against the Site or any improvement located on or within the Site. Nothing herein contained shall be deemed to prevent or prohibit Provider from contesting the validity or amount of any such tax, assessment, or fee in the manner authorized by law. Provider shall be responsible for payment of any personal property taxes, possessory interest taxes, permit fees, business license fees and any and all fees and charges of any nature levied against the System and operations of Provider at any time. If bills for taxes on the System are received by City, City shall remit such bills to Provider.

Packet Page 783 of 1189Attachment 2 Page 31 of 159

29 B. Liens. Provider shall not directly or indirectly cause, create, incur, assume or suffer to exist any liens on or with respect to the Site or City’s interest therein. If Provider breaches its obligations under this Section, it shall immediately notify City in writing, shall promptly cause such lien to be discharged and released of record without cost to City, and shall defend and indemnify City against all costs and expenses (including reasonable attorneys' fees and court costs at trial and on appeal) incurred in discharging and releasing such lien.

17. Liability and Indemnity; Insurance.

A. Indemnity. To the fullest extent provided for by law, each Party (“Indemnifying Party”) agrees to indemnify, defend and hold harmless the other Party, its directors, officers, employees, and agents (each, an “Indemnified Party”) from and against any and all claims, whether or not involving a third-party claim, including demands, actions, damages, loss, costs, expenses, and attorney’s fees (collectively, “Indemnity Claims”), arising out of or resulting from any breach, negligent act, error or omission or intentional misconduct by the Indemnifying Party or its trustees, directors, officers, employees, contractors, subcontractors or agents under the terms of this Agreement; provided, however, that the Indemnifying Party will not have any obligation to indemnify the Indemnified Party from or against any Indemnity Claims to the extent caused by, resulting from, relating to or arising out of the negligence or intentional misconduct of an Indemnified Party or any of its directors, officers, employees or agents.

If an Indemnified Party determines that it is entitled to defense and indemnification under this Section, such Indemnified Party shall promptly notify the Indemnifying Party in writing of the Indemnity Claim and provide all reasonably necessary or useful information, and authority to settle and/or defend Indemnity Claim. Defense and indemnification provided by the Indemnifying Party under this Section shall be provided with legal counsel reasonably agreed to by the Identified Party.

No settlement that would impose costs or expense upon the Indemnified Party shall be made without such Party’s written consent.

B. Insurance.

1) Provider Insurance. At all times during the term of the PPA, and any necessary extension thereof for removal of the System from the Site, Provider and all sub- contractors, shall obtain, maintain and keep in full force and effect the following insurance for coverage of all obligations and associated activities under this Agreement, including but not limited to the use and occupancy of the Site, the business operated by the City thereon, and the construction, installation, operation, maintenance and repair of the System, in the amounts, and with the conditions required, as set forth herein, provided that the limits set forth herein may be satisfied through a combination of primary and excess policies. Each policy required in (b)(c)(d) below shall include an additional insured endorsement in favor of City with an additional insured endorsement for both ongoing and completed operations as it pertains to (b) and shall include an endorsement specifying that such coverage is primary and non-contributory as to any other coverage available to the additional insured. Provider shall, within thirty (30) days of the Effective Date of this Agreement and annually thereafter or as requested by City, provide certificates of Packet Page 784 of 1189Attachment 2 Page 32 of 159

30 insurance and endorsements demonstrating compliance with the requirements of this Section.
a.Workers’ Compensation Insurance for Provider’s employees to the extent of statutory limits and Occupational Disease and Employer’s Liability Insurance for not less than $1,000,000 per occurrence.
b.Commercial General Liability Insurance with a $2,000,000 per occurrence and $5,000,000 aggregate limit of liability for Bodily Injury, Personal and Advertising Injury and Property Damage Liability, including coverage for Contractual Liability and Products and Completed Operations Liability. c.Automobile Liability Insurance with limits not less than: Bodily Injury coverage at $2,000,000 each accident, and Property Damage coverage at $2,000,000 each accident.
d.Excess Liability Insurance in an aggregate amount of not less than $5,000,000 providing greater limits of insurance to Provider’s Employer’s Liability, Commercial General Liability and Automobile Liability Insurance which also shall not be more restrictive than coverage provided by these policies.
e.Builder’s Risk/Installation Floater Insurance in a sufficient amount to protect Provider’s property, materials, tools and other financial interests on the Project.
f.Professional Liability Insurance with limits not less than $1,000,000 per claim, with a two-year tail, solely to the extent and for such time as Provider or any Subcontractor is actively engaged in work with professional liability exposure.
2)City Insurance. City shall maintain and covenants that it shall maintain during the Term (i) insurance sufficient to insure it against loss or destruction of the Site, including losses occasioned by operation of the System, and (ii) general liability insurance including bodily injury, property damage, contractual and personal injury. Notwithstanding the foregoing, City reserves the right to self-insure. 3)Waiver of Subrogation. Provider shall cause each insurance policy obtained by them to include a waiver of subrogation or waiver of the transfer of rights of recovery against City by the insurer in connection with any damage covered by any policy of Provider. City reserves the right to request copies of any insurer endorsements that may be necessary to affect this waiver of subrogation. 4)Subcontractor Insurance. Provider shall require and verify that all of its subcontractors maintain insurance meeting all of the requirements stated herein.

18.Easement.

City hereby grants to Provider an easement for the sole purpose of access to, on, over, under and across the Site for the purposes of undertaking the work required by Provider under this Agreement, including: installing, constructing, inspecting, operating, owning, maintaining, accessing, repairing, removing and replacing the System (the “Site Easement”). During the period Packet Page 785 of 1189Attachment 2 Page 33 of 159

31 of time between and including the date of the Notice to Proceed and the Commercial Operation Date, the Site Easement shall include, subject to the scheduling and activity needs of City, the reasonably necessary use of City’s Site for the reasonably necessary construction and installation activities under this Agreement, including, but not limited to, staging areas. City shall have no liability whatsoever in connection with property or equipment of Provider or Provider’s contractor(s), subcontractors or vendors. The Site Easement term shall continue until the date that is one hundred eighty (180) days following the date of expiration or termination of this Agreement.

The City hereby covenants that Seller shall have access to the Site and System during the Site Easement term. Provider shall notify City prior to entering the Site except in situations where there is imminent risk of damage to persons or property.

19.Assignment; Cooperation with Financing.

A.Assignment by Provider. Except as expressly provided in this Agreement, Provider may not sell, transfer, or assign its rights under this Agreement or any right, interest, or obligation therein (collectively, an “Assignment”), until at least twenty four (24) months have expired following the Commercial Operation Date, and only upon the prior written consent of City, which consent may not be unreasonably withheld, conditioned or delayed, provided that any assignee possesses all required skills, knowledge, expertise, experience, and financial capacity and creditworthiness necessary to perform Provider’s obligations under this Agreement, and assumes in writing the obligations of Provider under this Agreement. Provider shall provide City with no less than sixty (60) Days’ notice of the request to transfer ownership of the Project. Notice shall identify the party purchasing the Project and provide sufficient detail of the proposed owner for City to evaluate the new owner. Notice shall include, but not be limited to, the following details of the proposed owner: Experience with PPAs and current portfolio; Past two years of financials; Proof of insurance, meeting City requirements and naming City; Confirmation of operations and maintenance provider and outline of operations and maintenance program if different from existing; Details and example of annual report and invoicing; and Confirmation that all terms under this Agreement and any related documents and agreements will be performed. Notwithstanding the foregoing, Provider may, without the prior written consent of City, (i) assign, mortgage, pledge or otherwise collaterally assign its interests in this Agreement to any Secured Party in connection with any financing for the ownership, acquisition, construction, operation or use of the System as set forth in subsection B, or (ii) assign its rights, interests and obligations in this Agreement to an affiliate of Provider which is controlled by Provider or under common control with Provider. This Agreement shall be binding on and inure to the benefit of the successors and permitted assignees.

B.Collateral Assignment by Provider for Financing Purposes. a.In the event Provider assigns its rights under this Agreement as security in connection with any financing transaction entered into by Provider, Provider may mortgage or grant a first priority perfected security interest in this Agreement and the System, and may collaterally assign this Agreement and the System to any mortgagees or holders of security interests, including their successors or assigns (hereinafter collectively referred to as “Secured Parties”), provided that any such collateral assignment of this Agreement by Provider shall not release Provider from its obligations or liabilities under this Agreement. City agrees to not unreasonably withhold, condition Packet Page 786 of 1189Attachment 2 Page 34 of 159

32 or delay its compliance with any reasonable request that City execute any consent, estoppel agreement or other documents related to such financing transaction as may reasonably be required by such Secured Parties, provided that Provider will reimburse City for the reasonably and documented legal fees and costs incurred by such assignment.

C.Assignment by City. Except as otherwise provided in this Agreement, City may assign its rights under this Agreement only upon the prior written consent of Provider, which consent may not be unreasonably withheld, conditioned or delayed; provided that any such assignee (i) is of equal or greater creditworthiness than City and (ii) assumes in writing the obligations of City under this Agreement. Notwithstanding the foregoing, City may assign its rights under this Agreement without Provider’s consent to any Person succeeding to all or substantially all of the assets of City of equal or greater creditworthiness than City, and provided, further, that any such transferee or assignee assumes in writing the obligations of City under this Agreement.

20.Confidentiality; Publicity.

A.Confidential Information. Any financial, statistical, personal, technical and other data and information relating to a Party’s operations which are made available to the other Party in order to carry out this Agreement shall be reasonably protected by such other Party from unauthorized use, except to the extent that disclosure thereof is required to comply with applicable law, including but not limited to the California Public Records Act and the Brown Act. The disclosing Party shall identify all confidential data and information at the time it is provided in writing, including by conspicuously marking each such document as “Confidential.” Confidentiality does not apply to information, which is known to a receiving Party from other sources, which is otherwise publicly available, or which is required to be disclosed pursuant to an order or requirements of a regulatory body or a court.
1)Confidential Information shall comprise that which Provider identifies as confidential in accordance Applicable Law, including the California Public Records Act, California Government Code § 7920 et seq (“CPRA”), such as, for example only, trade secrets.
2)The Parties agree and acknowledge that this Agreement, and each document incorporated herein, is a public record subject to public disclosure, and shall be publicly disclosed in conjunction with any actions by City’s Governing Board related to approval or ratification hereof, including, without limitation, consideration during a public hearing as required under Government Code section 4217.12.
3)City shall not be liable to Provider for any disclosure made it its reasonable determination and in good faith compliance with applicable provisions of the CPRA, and Provider will be solely responsible for and shall solely bear all costs and expenses related to or arising from litigation costs if Provider chooses to pursue enforcement of its rights under the CPRA, and shall reimburse City for all Packet Page 787 of 1189Attachment 2 Page 35 of 159

33 reasonable costs and expenses related to or arising from litigation related to this Article 20 in which City is reasonably compelled to engage B.Disclosure. Other than under the REC Reporting Rights and except as may be required by applicable law, including but not limited to, the California Public Records Act, the Brown Act, or as otherwise identified above, neither Party shall make any disclosure of any designated confidential information related to this Agreement without the specific prior written approval from the other of the content to be disclosed and the form in which it is disclosed, except for such disclosures to the Parties’ financing sources, creditors, beneficiaries, partners, members, officers, employees, agents, consultants, attorneys, accountants and exchange facilitators as may be necessary to permit each Party to perform its obligations hereunder and as required to comply with applicable laws or rules of any exchange upon which a Party’s shares may be traded.

Notwithstanding the foregoing, nothing contained herein shall be deemed to restrict or prohibit City from complying with applicable law regarding disclosure of information, including but not limited to the California Public Records Act and the Brown Act.

C.Publicity. The Parties share a common desire to generate favorable publicity regarding the System and their association with it. The Parties agree that they may, from time to time, issue press releases regarding the System and that they shall reasonably cooperate with each other in connection with the issuance of such releases. Each Party agrees that it shall not issue any press release regarding the System without the prior written approval from the other of the content to be disclosed and the form in which it is disclosed, and each Party agrees not to unduly withhold, condition or delay any such approval. In addition, the Parties hereby agree that (i) the City may publicize that it is serving as a “solar host” for the System; (ii) Provider may publicize that it is serving as the developer, owner and/or operator of the System; and (iii) City, and Provider may display photographs of the System and disclose the nameplate capacity rating of the as-built System in its advertising and promotional materials, provided that any such materials identify the City as the solar host, and Provider as the owner, operator and developer, of the System and all information shall be consistent with this Agreement. Without limitation of the foregoing, Provider agrees to share with City, in digital format, any photographs and other schematics taken by Provider of the Site and the System, and further agrees that City may use such photographs and other schematics for the purpose of marketing and promoting their operations.

Nothing herein shall limit in any way, to any extent the right of individual persons, including, without limitation, members of City’s Governing Board, from exercising their right to free speech in relation to this Agreement and any subject matter hereof, within the constraints of Applicable Law. Nothing herein shall compel either Party to make statements beyond its sole, reasonable, good faith discretion.

21.Legal Effect and Status of Agreement.

A.City Not Operator. Neither City nor any Party related to City shall have the right or be deemed to operate the System for purposes of Section 7701(e)(4)(A)(i) of the Internal Revenue Code.

Packet Page 788 of 1189Attachment 2 Page 36 of 159

34 B.Burdens/Benefits of System Ownership. Notwithstanding any provision to the contrary under this Agreement, neither City nor any Party related to City shall (i) bear or be deemed to bear any significant financial burden if there is nonperformance by Provider under this Agreement, as the phrase “any significant financial burden if there is nonperformance” is used in Section 7701(e)(4)(A)(ii) of the Internal Revenue Code; or (ii) be deemed to receive any significant financial benefit if the operating costs of the System are less than the standard of performance and/or operation set forth in this Agreement, as the phrase “significant financial benefit if the operating costs of such facility are less than the standards of performance or operation” is used in Section 7701(e)(4)(A)(iii) of the Internal Revenue Code.

C.No Capital Lease; Forward Contract. The Parties acknowledge and agree that for accounting or tax purposes, this Agreement is not and shall not be construed as a capital lease and, pursuant to Section 7701(e)(3) of the Internal Revenue Code, this Agreement is and shall be treated by each Party as a service contract for the sale to City of electric energy produced at an alternative energy System. Each of the Parties agrees that it will not dispute that (i) the transaction contemplated by this Agreement constitutes a “forward contract” within the meaning of the United States Bankruptcy Code and (ii) each Party is a “forward contract merchant” within the meaning of the United States Bankruptcy Code.

22.Miscellaneous.

A.Amendments. This Agreement may be amended only in a writing signed by both Provider and City or their respective successors in interest.

B.Notices. Any notice required or permitted to be given in writing under this Agreement shall be mailed by certified mail, postage prepaid, return receipt requested, or sent by overnight courier service, or personally delivered to a representative of the receiving Party, or sent by facsimile or email (provided an identical notice is also sent simultaneously by mail, overnight courier, or personal delivery as otherwise provided in this Section). All such communications shall be mailed, sent or delivered, addressed to the Party for whom it is intended, at its address set forth below. A Party may change its address by providing written notice to the other Party in accordance with this Section.

If to City:

City of Fairfield
Attention: Public Works/Utilities
1000 Webster Street, 3rd Floor
Fairfield, CA, 94533
Phone: 707-428-7485
Facsimile: 707-428-7607
Email: [email protected]
If to Provider:

Onyx Development Group LLC
Attention: Legal
230 Park Avenue, Suite 845
New York, NY 10169
Phone: 857.928.0295
Email: [email protected]
C.Non-Waiver. The failure, delay or forbearance by either Party to exercise any of its rights or remedies under this Agreement or to provide written notice of any default to a defaulting Party, will not constitute a waiver of such rights or remedies. No Party will be deemed to have waived any right or remedy unless it has made such waiver specifically in writing. The waiver by either Party of any default or breach of any term, condition or provision herein contained Packet Page 789 of 1189Attachment 2 Page 37 of 159

35 shall not be deemed to be a waiver of any subsequent breach of the same term, condition or provision, or any other term, condition or provision contained herein.

D.No Set-Off. Except as otherwise set forth herein, each Party hereby waives all rights to set-offs of amounts due hereunder. The Parties agree that all amounts due hereunder are independent obligations and shall be made without set-off for other amounts due or owed hereunder.

E.Intellectual Property. Nothing in this Agreement shall be construed to convey to City a license or other right to trademarks, copyrights, technology or other intellectual property of Provider.

F.Severability. Should any provision of this Agreement for any reason be declared invalid or unenforceable by final and non-appealable order of any court or regulatory body having jurisdiction, such decision shall not affect the validity of the remaining portions, and the remaining portions shall remain in full force and effect as if this Agreement had been executed without the invalid portion.

G.Survival. Any provision of this Agreement that expressly or by implication comes into or remains in full force following the termination or expiration of this Agreement shall survive the termination or expiration of this Agreement.

H.Headings. The headings in this Agreement are solely for convenience and ease of reference and shall have no effect in interpreting the meaning of any provision of this Agreement.

I.Choice of Law. This Agreement shall be construed in accordance with the laws of the State of California (without regard to its conflict of laws principles). The venue for any dispute arising out of or relating to this Agreement shall be in the California County in which the System is located.

J.Binding Effect. This Agreement and its rights, privileges, duties and obligations shall inure to the benefit of and be binding upon each of the Parties hereto, together with their respective successors and permitted assigns.

K.No Partnership. This Agreement is not intended, and shall not be construed, to create any association, joint venture, agency relationship or partnership between the Parties or to impose any such obligation or liability upon either Party. Neither Party shall have any right, power or authority to enter into any agreement or undertaking for, or act as or be an agent or representative of, or otherwise bind, the other Party.

L.No Third-Party Beneficiaries. This Agreement is solely for the benefit of the Parties hereto and no right or cause of action shall accrue by reason hereof for the benefit of any third party not a party hereto, other than the Indemnitees and any Secured Parties.

Packet Page 790 of 1189Attachment 2 Page 38 of 159

36 M. Counterparts. This Agreement may be executed in counterparts, which shall together constitute one and the same agreement. Electronic, facsimile or copies of signature pages shall have the same force and effect as originals.

N. Further Assurances. Upon the receipt of a written request from a Party, each Party shall execute or cause to be executed such additional documents, instruments, estoppels and assurances, and take such additional actions, as are reasonably necessary and desirable to carry out the terms and intent hereof, including but not limited to an Interconnection Agreement. Neither Party shall unreasonably withhold, condition or delay its compliance with any reasonable request made pursuant to this Section.

O. Entire Agreement. This instrument and the documents referenced herein represent the full and complete agreement between the Parties hereto with respect to the subject matter contained herein and supersedes all prior written or oral agreements between said Parties with respect to said subject matter.

INWITNESS WHEREOF, the Parties have executed this Agreementon theEffective Date.

City:

By:________________________
Name:

Title:
[PROVIDER NAME]
By: ________________________
Name:

PROVIDER:

By: ________________________
Name:

Title: Title:

Packet Page 791 of 1189Attachment 2 Page 39 of 159

37 Schedule 1 – System and Premises Description
A. Premises
Physical Address:

Parcel Number:

Waterman Treatment Plant
2900 Vista Grande Circle, Fairfield, CA 95434
Site diagram attached as Attachment A: ☒Yes ☐ No
Name of Mortgagee (lender): Not Applicable
Gross acreage of Premises:

Acreage to be used for System:

Refer to Site diagram
B. Description of Solar System
Type: Fixed-Tilt Ground Mount Solar PV System
paired with a Battery Energy Storage System
(BESS)
Solar System Size: 1,785 kW (DC) (this is an estimate (and not a guarantee) of the System size; Seller may update
the System Size prior to the Commercial
Operation Date.)
Module: The installation consists of (3000) QCells,
595W Photovoltaic Modules
Inverter: Chint SCH275KLT-DO/US-800-36 250W AC
output, UL1741 listed,
grid tied inverters
Mounting System: Fixed-Tilt Terrasmart Racking
The above System Description is based on known conditions as of the Effective Date. The final System Description may vary from the initial description set forth above and, following final completion of the System, the above details may be updated to reflect the System Description of the as-built System.

Packet Page 792 of 1189Attachment 2 Page 40 of 159

38 Packet Page 793 of 1189Attachment 2 Page 41 of 159

39 Exhibit A – Definitions

1. “Annual Production Estimate” shall mean, for the Solar Facility, the estimated energy production for a Contract Year as set forth in Exhibit B.

2. “Applicable Law” shall mean, with respect to any person, any law, statute, rule, regulation, ordinance, treaty, order, decree, judgment, decision, holding, injunction, registration, license, guideline, Governmental Approval, consent or requirement of any Governmental Authority having jurisdiction over such person or its property, as any of the foregoing may be amended from time-to-time, and any corresponding provisions of any successor to the foregoing, together any rules or regulations promulgated under such successor.

3. “Assignment” shall have the meaning as defined in Section 19(A).

4. “Authorities Having Jurisdiction” shall mean the governmental organization, office or individual responsible for approving equipment, an installation or a procedure.

5. “Battery Energy Storage System” (or “Battery Systems”) shall mean an energy storage system with the minimum nameplate power and energy capacity as shown in Exhibit F.

6. “Battery Systems Energy Shortfall Amount” shall mean an amount equal to the product of: (i) the Battery Systems Guarantee Rate, multiplied by (ii) the number of hours that one hundred percent (100%) of the nameplate power capacity of the Battery Systems was not available during the Measurement Period.

7. “Battery Systems Output” shall mean the total quantity of all actual electrical energy discharged by the Battery Systems as measured in kWhac by a Meter installed in close proximity to the Delivery Point. Output does not include the Green Attributes, Environmental Financial Incentives, RECs or REC Reporting Rights.

8. “Battery Systems Services” shall mean generating electricity bill cost savings for City through storage and discharge of electrical energy on and from the Battery Systems in accordance with Section 11(B).

9. “Battery Systems Guarantee Rate” means as defined in Exhibit C.

10. “City Conditions Precedent” shall have that meaning as set forth in Section 6(A) of the Agreement.

11. “City Permits” shall have that meaning as set forth in Section 5(C) of the Agreement.

12. “Conditions Precedent Deadline” shall have that meaning as set forth in Section 6(C) of the Agreement.

13. “Contract Year” shall mean a period of twelve (12) consecutive months (except in the case of the first Contract Year which may be longer) with the first Contract Year commencing on the Packet Page 794 of 1189Attachment 2 Page 42 of 159

40 Commercial Operation Date and each subsequent Contract Year commencing on the anniversary of the first day of the first month following the Commercial Operation Date.

14. “Commercial Operation” shall mean that (i) the Project is operating and able to produce and deliver Energy to City pursuant to the terms of this Agreement; (ii) Provider has received all local, state and federal Permits and other approvals as may be required by Law for the construction, operation and maintenance of the Project, including approvals, if any, required under the California Environmental Quality Act for the Project and related interconnection facilities.

15. “Commercial Operation Date” shall mean the date on which Provider achieves Commercial Operation for the Project.

16. “Commercial Operation Deadline” shall have that meaning as set forth in Section 6(D) of this Agreement.

17. “Days” shall mean calendar days, unless otherwise specified.

18. “Delay Liquidated Damages” shall mean the daily rate payable by the Provider to City for unexcused delays past the Commercial Operation Deadline as outlined in Section 6(D).

19. “Delivery Point” shall mean the Energy delivery point within Site’s electrical system on City’s side of the Site’s Distribution Utility meter, as designated by the physical interface of the System with the Site’s electrical system.

20. “Distribution Utility” shall mean the investor owned, public, or private utility or electric utility having jurisdiction over the interconnection of the Systems.

21.“Distribution Utility Upgrades” shall mean that scope of work and associated costs that the Distribution Utility requires on the Distribution Utility side of the Distribution Utility meter in order for the System to interconnect to the Distribution Utility system.

22. “Energy” shall mean electrical energy measured in kWhac.

23. “Energy Shortfall Amount” shall mean an amount equal to the product of: (i) the Output Guarantee Rate, multiplied by (ii) the difference between the delivered Output for such Measurement Period and the Output Guarantee for such Measurement Period.

24. “Environmental Financial Incentives” shall mean each of the following financial rebates and incentives that is in effect as of the Effective Date: (i) investment tax credits associated with the development, construction, ownership or operation of the System, accelerated depreciation, and other financial incentives in the form of credits, reductions or allowances associated with the System that may be applied to reduce any state or federal income taxation obligation, and (ii)the right to claim federal income tax credits under Sections 26 or 48 of the Internal Revenue Code or any state tax law or income tax deductions with respect to the System under the Packet Page 795 of 1189Attachment 2 Page 43 of 159

41 Internal Revenue Code or any state tax law. Environmental Financial Incentives do not include Green Attributes.

25. “Expiration Date” shall mean the last day of the month that follows the twenty-fifth (25th) annual anniversary of the Commercial Operation Date.

26. “Force Majeure” shall mean any event or circumstances beyond the reasonable control of and without the fault or negligence of the Party claiming Force Majeure, which cannot reasonably be avoided, mitigated or cured through the reasonable and diligent efforts of the Party claiming Force Majeure. It shall include, without limitation, interruption or delay of the construction of the System or failure or interruption of the production, delivery or acceptance of electricity due to: (i) natural phenomena, such as storms, hurricanes, floods, lightning, volcanic eruptions and earthquakes; (ii) explosions or fires arising from lightning or other causes unrelated to the acts or omissions of the Party seeking to be excused from performance; (iii) acts of war or public disorders, civil disturbances or riots, insurrection, sabotage, epidemic, terrorist acts, or rebellion; (iv) action by a Governmental Authority resulting in a moratorium on the activities related to this Agreement; and (v) the inability of one of the Parties, despite its reasonable efforts, to obtain, in a timely manner, any Permit necessary to enable the affected Party to fulfill its obligations in accordance with this Agreement, provided that the delay or non- obtaining of such Permit is not attributable to the Party in question and that such Party has exercised due diligence to obtain such Permit. Force Majeure will not be based on (i) City’s inability to use Energy purchased hereunder, (ii) Provider’s ability to sell Energy at a price greater than the price of Energy under this Agreement, or (iii) City’s voluntary or involuntary shutting down or closing of the facilities located at the Property. Economic hardship of either Party shall not constitute Force Majeure.

27.“Governmental Authority” shall mean the government of the United States of America, any other nation or any political subdivision thereof, whether state or local, and any agency, authority, instrumentality, regulatory body, court, central bank or other entity exercising executive, legislative, judicial, taxing, regulatory or administrative powers or functions of or pertaining to government (including any supra-national body exercising such powers or functions, such as the European Union or the European Central Bank).

28. “Governmental Approvals” shall mean any notices to, reports or other filings to be made with, or any consents, registrations, permits or authorizations to be obtained from, any Governmental Authority.

29. “Green Attributes” shall mean any and all credits, benefits, emissions reductions, offsets and allowances, howsoever entitled, attributable to the generation of Output from the System, and its displacement of conventional energy generation, that is in effect as of the Effective Date or may come into effect in the future. Green Attributes include but are not limited to Renewable Energy Certificates, as well as: (i) any avoided emissions of pollutants to the air, soil or water such as sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO) and other pollutants; (ii) any avoided emissions of carbon dioxide (CO2), methane (CH4), nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride and other greenhouse gases (GHGs) that have been determined by the United Nations Intergovernmental Panel on Climate Packet Page 796 of 1189Attachment 2 Page 44 of 159

42 Change, or otherwise by law, to contribute to the actual or potential threat of altering the Earth’s climate by trapping heat in the atmosphere; and (iii) the reporting rights to these avoided emissions, such as REC Reporting Rights. Green Attributes do not include (i) any energy, capacity, reliability or other power attributes from the System, (ii) Environmental Financial Incentives, (iii) fuel-related subsidies or “tipping fees” that may be paid to Provider to accept certain fuels, or local subsidies received by the generator for the destruction of particular preexisting pollutants or the promotion of local environmental benefits or (iv) emission reduction credits encumbered or used by the System for compliance with local, state or federal operating and/or air quality Permits.

30. “Hazardous Materials” means any hazardous or toxic material, substance or waste, including petroleum, petroleum hydrocarbons or petroleum products, petroleum by-products, radioactive materials, asbestos or asbestos-containing materials, gasoline, diesel fuel, pesticides, radon, urea formaldehyde, mold, lead or lead-containing materials, polychlorinated biphenyls; and any other chemicals, materials, substances or wastes in any amount or concentration which are regulated under or for which liability can be imposed under any Applicable Law.

31. “Insolation” shall mean the amount of solar energy measured in watts per square meter (W/m2) falling on a particular location during a specific time, as published by the National Renewable Energy Laboratory.

32. “Interconnection Agreement” shall mean an agreement entered into by and between City and the Distribution Utility which agreement shall provide for (i) each System to be interconnected with the Distribution Utility’s electricity distribution system, (ii) for energy to flow from each System to such system and (iii) for energy to flow from such system to the Site, as applicable, under the provisions of all applicable Distribution Utility’s tariffs.

33. “Internal Revenue Code” shall mean the Internal Revenue Code of 1986, as amended.

34. “kWac” shall mean kilowatt alternating current.

35. “kWdc” shall mean kilowatt direct current.

36. “kWhac” shall mean kilowatt-hour alternating current.

37. “Notice to Proceed” shall mean as defined in Section 6(C).

38. “Outage” shall mean as defined in Section 4(F).

39. “Output” or “Solar Facility Output” shall mean the total quantity of all actual electrical power generated by the Solar Facilities as measured by a Meter in close proximity to the Delivery Point measured in kWhac. Output does not include the Green Attributes, Environmental Financial Incentives, RECs or REC Reporting Rights.

40. “Output Guarantee Rate” shall mean as defined in Exhibit B.

Packet Page 797 of 1189Attachment 2 Page 45 of 159

43 41. “Parallel Energy Services” shall mean to remain interconnected to and receive grid services.

42. “Permits” shall mean all government permits and approvals, regulatory or otherwise required for the construction, installation, completion and operation of the System.

43. “Person” shall mean any individual, corporation, partnership, joint venture, association, joint stock company, trust, trustee, estate, limited liability company, unincorporated organization, real estate investment trust, government or any agency or political subdivision thereof, or any other form of entity.

44. “Power Price” shall mean the per kWhac rate(s) as set forth on Exhibit B

45. “Project” shall have that meaning as set forth in the Recitals of this Agreement.

46. “Provider Conditions Precedent” shall have that meaning as set forth in Section 6(B) of the Agreement.

47. “Provider Permits” shall have that meaning as set forth in Section 5(C) of the Agreement.

48. “RECs” or “Renewable Energy Certificates” shall mean renewable energy certificates related to and representing Green Attributes (also known as green tags, renewable energy credits, or tradable renewable certificates), which are tradable environmental commodities in the United States and represent 1 megawatt-hour (MWh) of electricity generated from an eligible renewable energy resource. These certificates can be sold and traded and the owner of the REC can claim to have purchased renewable energy.

49. “REC Reporting Rights” shall mean the right of a REC purchaser to report the ownership of accumulated RECs in compliance with federal or state law, if applicable, and to a federal or state agency or any other Party at the REC purchaser’s discretion, and include without limitation those REC Reporting Rights accruing under Section 1605(b) of the Energy Policy Act of 1992 and any present or future federal, state, or local law, regulation or bill, and international or foreign emissions trading program.

50. “Supervisory Control and Data Acquisition” or “SCADA” shall mean the system that monitors, communicates with, and controls devices throughout the System.

51. “Site” shall mean the portion of City’s real property on which a System is to be located pursuant to this Agreement, as described in Schedule 1 attached hereto.

52. “Solar Facility” means each solar photovoltaic generation plant, together with all necessary inverters, ancillary equipment with a target installation size expressed in kWdc and kWac as shown in Exhibit F to be installed at the Site and as described in Schedule 1 attached hereto.

53. “Termination Value” shall equal the amount shown in Exhibit D for each Contract Year.

Packet Page 798 of 1189Attachment 2 Page 46 of 159

44 Packet Page 799 of 1189Attachment 2 Page 47 of 159

45 Exhibit B – Power Price and Output Guarantee Rate

Contract
Period,
Months
Contract
Year Power Price
Annual
Production
Estimate
(kWh)
Output Guarantee
Rate
1-12 1 $0.1175 /kWhac Grace period
13-24 2 $0.1175 /kWhac 3,050,675 $0.027 /kWhac
25-36 3 $0.1175 /kWhac 3,035,422 $0.027 /kWhac
37-48 4 $0.1175 /kWhac 3,020,245 $0.027 /kWhac
49-60 5 $0.1175 /kWhac 3,005,144 $0.027 /kWhac
61-72 6 $0.1175 /kWhac 2,990,118 $0.027 /kWhac
73-84 7 $0.1175 /kWhac 2,975,167 $0.027 /kWhac
85-96 8 $0.1175 /kWhac 2,960,291 $0.027 /kWhac
97-108 9 $0.1175 /kWhac 2,945,490 $0.027 /kWhac
109-120 10 $0.1175 /kWhac 2,930,762 $0.027 /kWhac
121-132 11 $0.1175 /kWhac 2,916,109 $0.027 /kWhac
133-144 12 $0.1175 /kWhac 2,901,528 $0.027 /kWhac
145-156 13 $0.1175 /kWhac 2,887,020 $0.027 /kWhac
157-168 14 $0.1175 /kWhac 2,872,585 $0.027 /kWhac
169-180 15 $0.1175 /kWhac 2,858,222 $0.027 /kWhac
181-192 16 $0.1175 /kWhac 2,843,931 $0.027 /kWhac
193-204 17 $0.1175 /kWhac 2,829,712 $0.027 /kWhac
205-216 18 $0.1175 /kWhac 2,815,563 $0.027 /kWhac
217-228 19 $0.1175 /kWhac 2,801,485 $0.027 /kWhac
229-240 20 $0.1175 /kWhac 2,787,478 $0.027 /kWhac
241-252 21 $0.1175 /kWhac 2,773,540 $0.027 /kWhac
253-264 22 $0.1175 /kWhac 2,759,673 $0.027 /kWhac
265-276 23 $0.1175 /kWhac 2,745,874 $0.027 /kWhac
277-288 24 $0.1175 /kWhac 2,732,145 $0.027 /kWhac
289-300 25 $0.1175 /kWhac 2,718,484 $0.027 /kWhac

The Power Price set forth in Exhibit B includes consideration for reimbursement of Development Costs in the amount of $385,000.

The City shall, at the City’s sole cost and expense, install a new service transformer in connection with the Distribution Utility Upgrades as per the Supplemental Review of the Interconnection Agreement for the High Lift upgrade project (PM#35228024) with an estimated cost to be paid to the Distribution Utility of $213,528 (the “Transformer Cost”). The City shall reimburse Provider, at cost, for any amounts paid by Provider to the Distribution Utility for the Transformer Cost.

Packet Page 800 of 1189Attachment 2 Page 48 of 159

46 Provider assumed that the total cost to be paid to the Distribution Utility in connection with the Distribution Utility Upgrades would be $4,000. If the actual cost reasonably incurred by Provider for Distribution Utility Upgrades exceeds $4,000, then Provider shall be entitled to a proportionate increase of the Power Price in an amount of $0.0005/kWh for each additional $10,000 increase in cost. If the actual cost reasonably incurred by Provider for Distribution Utility Upgrades is less than $4,000, City shall be entitled to a proportionate decrease of the Power Price in an amount of $0.0005/kWh per $10,000 decrease in cost. Provider shall work diligently with City to minimize the costs for Distribution Utility Upgrades at all points of the Project.

The Power Price set forth in this Exhibit B is based on certain assumptions set forth in Section 4(C) of the Agreement, and the Parties acknowledge that the Power Price may, if (and only if) the assumptions provided in Section 4(C) are inaccurate, require an adjustment. Provider shall deliver to City reasonable evidence of any increases in cost incurred by Provider to re-design, construct, install or maintain the System as a result of such assumptions being inaccurate, provided that City and Provider acknowledge and agree that an executed change order delivered by Provider to a contractor or subcontractor shall constitute reasonable evidence of such cost increase. The Power Price shall be adjusted as follows:

1. If such cost increase is due to unforeseen conditions or groundwork at the Site (including but not limited to excavation/circumvention of underground obstacles), and such cost increases were not mitigated by the City, then Provider shall be entitled to a proportionate increase of the Power Price in an amount of $0.0005/kWh for each additional $10,000 increase in cost.

2. If Hazardous Substances are discovered at the Site, and such cost increases were not mitigated by the City, then Provider shall be entitled to a proportionate increase of the Power Price in an amount of $0.0005/kWh for each additional $10,000 increase in cost to Provider to re-design, construct, install or maintain the System.

3. If such cost increase is due to the failure by City to obtain the City Permits by June 1, 2024, assuming timely delivery of documents needed from the Provider to the City as agreed upon in the project schedule, then Provider shall be entitled to a proportionate increase of the Power Price in an amount of $0.0005/kWh for each additional $10,000 increase in cost to Provider to re- design, construct, install or maintain the System.

4. If such cost increase is due to the inaccuracy of any information provided by City and relied upon by Provider, then Provider shall be entitled to a proportionate increase of the Power Price in an amount of $0.0005/kWh for each additional $10,000 increase in cost to Provider to re-design, construct, install or maintain the System.

Packet Page 801 of 1189Attachment 2 Page 49 of 159

47 Exhibit C – Battery Systems Guarantee Rate

Contract
Period,
Months
Contract
Year
Guaranteed
Cycles Battery Systems Guarantee Rate
1-12 1 296 $53 /cycle
13-24 2 282 $53 / cycle
25-36 3 274 $53 / cycle
37-48 4 269 $53 / cycle
49-60 5 264 $53 / cycle
61-72 6 259 $53 / cycle
73-84 7 256 $53 / cycle
85-96 8 252 $53 / cycle
97-108 9 248 $53 / cycle
109-120 10 245 $53 / cycle

Packet Page 802 of 1189Attachment 2 Page 50 of 159

48 Exhibit D – Termination Values

Contract Period,
Months Contract Year Termination Value
1-12 1 $10,852,749.78
13-24 2 $9,635,986.96
25-36 3 $8,203,178.11
37-48 4 $6,961,077.29
49-60 5 $5,830,570.58
61-72 6 $4,689,415.83
73-84 7 $4,428,326.51
85-96 8 $4,255,031.45
97-108 9 $4,075,599.54
109-120 10 $3,891,682.48
121-132 11 $3,702,139.22
133-144 12 $3,506,736.06
145-156 13 $3,304,295.92
157-168 14 $3,096,396.88
169-180 15 $2,881,878.01
181-192 16 $2,660,466.02
193-204 17 $2,430,961.25
205-216 18 $2,194,862.61
217-228 19 $1,950,982.48
229-240 20 $1,699,001.29
241-252 21 $1,437,689.38
253-264 22 $1,169,305.95
265-276 23 $891,816.63
277-288 24 $604,849.06
289-300 25 $307,136.45

Packet Page 803 of 1189Attachment 2 Page 51 of 159

49 Exhibit E – Project Development Scope Responsibility

City of Fairfield Permits and Project
Development Scope
Provider Permits and Project Development
Scope
Building, zoning, electrical
CEQA Exemption
Title/Deed for Ownership
Geotech
SWPPP
Civil Engineering

Packet Page 804 of 1189Attachment 2 Page 52 of 159

Exhibit F – General Conditions and Technical Specifications

[ATTACHED BEHIND THIS COVER PAGE]

Packet Page 805 of 1189Attachment 2 Page 53 of 159

1 GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Table of Contents
GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS ................................................................... 1

1. PROJECT OVERVIEW ................................................................................................................................... 2

2. GENERAL REQUIREMENTS ........................................................................................................................ 2

3. ENGINEERING AND DESIGN REQUIREMENTS ....................................................................................... 9

4. EQUIPMENT ................................................................................................................................................. 18

5. COMMUNICATIONS AND MONITORING SYSTEMS ............................................................................. 23

6. CONSTRUCTION ......................................................................................................................................... 26

7. FINAL PROJECT CLOSEOUT ..................................................................................................................... 32

8. OPERATIONS AND MAINTENANCE ........................................................................................................ 34 ATTACHMENT A - PRELIMINARY ENGINEERING DESIGN PACKAGE ..................................................... 35 ATTACHMENT B - SITE ASSESSMENT TABLE ............................................................................................... 36 ATTACHMENT C - PROJECT SCHEDULE ......................................................................................................... 37 ATTACHMENT D - COMMISSIONING SCHEDULE ......................................................................................... 38 ATTACHMENT E – OPERATIONAL OBJECTIVES .......................................................................................... 39 ATTACHMENT F – MAJOR EQUIPMENT.......................................................................................................... 40

Packet Page 806 of 1189Attachment 2 Page 54 of 159

2 1. PROJECT OVERVIEW

Installer shall be solely responsible for all work required to complete the Project including but not limited to: (a) project management including design, engineering, submittals, construction, interconnection, commissioning and Distribution Utility sign off; (b) procurement of all materials and equipment; (c) design and engineering including civil, structural, electrical, seismic and wind loading requirements and fire protection requirements; (d) permitting and environmental compliance with the current version of all applicable codes and standards; (e) Distribution Utility interconnection requirements compliance; (f) site preparations including but not limited to grubbing, clearing, grading, roads, dust control, drainage requirements, construction wastewater and storm water disposal, removing excess debris, all final site preparation, and all other requirements set forth in the Agreement; (g) meters, monitoring, and SCADA system and weather station; (h) production analysis and performance guarantee for the Systems; (i) conformance to manufacturers’ installation requirements and warranty terms; (j) acceptance testing, commissioning, interconnection signoff and Permission to Operate by the Distribution Utility; (k) construction closeout including punch list, as-built drawings and documents package, site cleanup, and cleaning of the Systems; (l) operation and maintenance, if required in the Agreement (m) site security requirements; (n) safety plans and measures per Site Host approval. In addition to these general responsibilities, Installer shall be responsible for all additional requirements as set forth in the Agreement and all exhibits and attachments, including but not limited to this General Conditions and Technical Specifications.

Installer shall also be responsible for providing Site Host with copies of relevant Operations and Maintenance manuals, testing reports, start-up procedures, warranties, guarantees, and commissioning reports corresponding to the work. Installer shall execute all of its obligations in a manner which reasonably minimizes interference and inconvenience to Site Host. Installer shall regularly report status of Installer’s execution of its obligations under the Agreement to Site Host.

2. GENERAL REQUIREMENTS
Project Management
Installer shall act as the general contractor and is responsible for overall safety on each Project Site.

Installer shall conduct all project management activities required to complete the Project, including coordination efforts with Site Host’s representative, the Distribution Utility, inspectors, permitting agencies, suppliers, subcontractors, Installer’s office, field Project staff and any other third parties that are involved in or impacted by the Project. The installation must be “turn-key,” requiring a minimum level of supervision and project management by the Site Host, including all materials, equipment and labor, completed and commissioned per the specifications and general conditions contained herein. All Distribution Utility related interconnection work, fees, and installations necessary to make the Systems operational will be the sole responsibility of the Installer in accordance with any requirements of the Distribution Utility.

Project Schedule

Installer will develop, with input from Site Host, a Project Schedule using Microsoft® Project or equivalent and submit the Project Schedule to Site Host. Site Host will establish a weekly construction meeting at which time the work of the previous week will be reviewed, and a three-week look-ahead schedule will be coordinated. The three-week look-ahead schedule shall be created in MS Excel® or equivalent and present the list of activities occurring at each Site on a daily basis.

Packet Page 807 of 1189Attachment 2 Page 55 of 159

3 The work on the Project shall be completed on or before the Commercial Operation Deadline in accordance with the Project Schedule set forth below and as may be reasonably amended from time to time during the Agreement Term but in no case extending beyond the Commercial Operation Deadline.

The Project Schedule shall only be modified upon the written approval of Site Host. Any modified schedule approved by Site Host shall replace the existing Project Schedule set forth below.

Deadlines dictated by any and all incentive programs, including the Investment Tax Credit, must be accounted for in the Project Schedule.

The Project Schedule shall include, at a minimum, the following milestones and shall become a part of the Agreement upon approval of Site Host:

Milestone
50% drawings due to Site Host
90% drawings due to Site Host
100% drawings due to Site Host
Site Host review of 50% drawings
Site Host review of 90% drawings
Site Host review of 100% drawings
Permit Approval
Major Equipment Order Date
Site Preparation Start
Site Preparation Completion
Construction Start
Electrical & Mechanical Completion
Interconnection Sign-off
Testing & Commissioning Completion
Utility Meter and Rate Switch Submittal
Permission to Operate Date
Commercial Operation Date
Commercial Operation Deadline
Final Project Completion Date

The Project Schedule shall indicate the beginning and completion dates of all phases of construction and shall use the critical path method for the planning and scheduling of all work required. The schedule will separately identify those milestones or events that must be completed before other portions of the work can be accomplished. The Project Schedule shall incorporate float for inclement weather and resulting muddy site conditions due to rain and shall also include any potential acceleration paths. Scheduled float for non-working rain-related days and resulting muddy site conditions shall be based upon the latest and nearest available data from acceptable data issued from the National Weather Service.

A monthly project schedule update shall be provided to accurately indicate the actual progress of the work against the baseline Project Schedule for the prior month, and the remaining planned completion of the work.

The scheduling is necessary for Site Host’s adequate monitoring of the progress of the work. Site Host may disapprove such a schedule and require modification to it if, in the opinion of Site Host, adherence to the progress schedule will cause the work not to be completed in accordance with the Agreement.

Installer shall adhere to any such modifications required by Site Host. Between the monthly schedule Packet Page 808 of 1189Attachment 2 Page 56 of 159

4 updates, it is the obligation of Installer to monitor the progress of the work against the current construction schedule activities, and to notify Site Host in writing of all changed activity start dates and finish dates.

Installer will exchange scheduling information with subcontractors and suppliers. Installer will order work, equipment and materials with sufficient lead time to avoid interruption of the work.

Installer shall also, if requested by Site Host, provide revised schedules within fifteen (15) days if, at any time, Site Host considers the Commercial Operation Deadline to be in jeopardy. The revised schedule shall be designed to show how Installer intends to accomplish the work to meet the original Commercial Operation Deadline. The form and method employed by Installer shall be the same as for the original progress schedule. Installer shall modify any portions of the schedule that become infeasible because of “activities behind schedule” or for any other valid reason. Installer will provide documents and justification for any schedule changes. An activity that cannot be completed by its original Commercial Operation Deadline shall be deemed to be behind schedule.

IF INSTALLER SUBMITS A REVISED SCHEDULE SHOWING AN EARLIER COMMERCIAL OPERATION DATE FOR THE PROJECT, SITE HOST’S ACCEPTANCE OF THIS REVISED

SCHEDULE SHALL NOT ENTITLE INSTALLER TO ANY ADDITIONAL COMPENSATION OR CLAIM DUE TO ANY SUCH REVISED SCHEDULE UNLESS OTHERWISE AGREED.

Site Host Project Objectives
Site Host requires that Installer perform each of the following in accordance with the Agreement:

A. Prepare and submit all relevant incentive and funding applications on a timely manner to provide the best opportunity for the Project Sites to receive incentives and funding.

B. Ensure that construction activities and Project installation and operation are performed safely, comply with all applicable laws, and do not result in any adverse effect on Site Host staff, surrounding persons and property, existing facilities, local power quality, local data systems or daily operations at any Project Site throughout the life cycle of the installation.

Manage construction and operation activities so that they minimally disrupt the calendar of operations at each Project Site.

C. Define a scope of work and create a schedule for the Project and manage the entire Project, including but not limited to contracts, design, engineering, permitting, approvals, procurement, pre-construction, Distribution Utility interconnection, installation, testing, and commissioning. Ensure work is completed when needed to meet Project deadlines.

D. Design and implement the Systems to obtain maximum projected net savings and cash flow over the term of the Agreement using proven technology that complies with the terms and conditions of the Agreement and complies with all relevant codes and regulations.

E. Design and implement the Systems as defined in the Site Assessment Table and conceptually defined in the Preliminary Engineering Design Package.

F. Design and implement the Systems to meet the Operational Objectives.

Packet Page 809 of 1189Attachment 2 Page 57 of 159

5 G. Design and implement the Systems sized in compliance with the Distribution Utility’s applicable rate structure, energy consumption, and load profiles for each Project Site, and in compliance with all applicable Distribution Utility requirements. Ensure that all Systems are designed and installed mitigate the need for Distribution Utility upgrades and facilitate ensuring that such costs are minimized throughout the entire Project.

H. Ensure that the Project meets all financial and environmental incentive requirements and deadlines.

I. Ensure that all Project design and construction activities are coordinated with Site Host operations and/or construction activities and are in compliance with written work rules, safety requirements, and specifications provided by the Site Host at all times.

Communication Protocol
Throughout the entire Project timeline, the representative selected by Site Host will be Installer’s main source of contact regarding any and all Project related issues. At all times, Installer shall include Site Host’s representative in all communications with the Site Host.

Unless otherwise stated in the Agreement and subject to change by the Site Host, the Parties shall meet once every two weeks during the design phase of the Project and weekly during the construction phase of the Project to, among other things, review work performed to date and to be performed. Installer shall organize the meeting, prepare, and distribute meeting notes. Meeting minutes shall be based on a mutually agreed to meeting minutes template, and shall include a three-week look-ahead schedule, request for information log, change order log and submittals log with three week look-ahead priority list. Meeting minutes shall be updated during the meeting and distributed at the end of the meeting. Site Host shall have five business days after receipt of such minutes to object to them in writing and provide corrections in writing. A quorum of meeting attendees will be named at the first meeting but may be modified as necessary by the Site Host. The named quorum shall be in attendance at all Project meetings. A pre-construction meeting shall be held prior to any work being performed on the site with all required parties.

Sizing of the Systems
Installer is responsible for the sizing of the Systems to meet the Operational Objectives of the Project at each Site.

Incentives
Unless specifically stated otherwise in other Agreement, Installer shall prepare and submit to all applicable agencies, on behalf of Site Host, or assist Site Host in doing so directly, all applications, proof of progress submittals, and claim forms and documentation necessary for any environmental or financial incentives and rebates, provided that Site Host shall have the opportunity to review, comment on, and approve all such applications and documentation prior to submission by Installer. If the Site Host decides to prepare and submit such documents, Installer will coordinate and provide Site Host promptly upon Site Host’s written request all documents reasonably necessary for Site Host to do so.

Installer shall not charge any additional fee for its services. Unless stated otherwise in other Agreement, Site Host shall pay for all fees required to file the applications. All rebates or incentives available in connection with the Systems are owned by the Site Host.

Physical Site Investigation & Project Feasibility Assessment Packet Page 810 of 1189Attachment 2 Page 58 of 159

6 Installer shall read and become knowledgeable with all documentation available concerning the Project and visit the Sites to assess its conditions and logistics, including but not limited to all Distribution Utility interconnection related requirements. Installer shall conduct feasibility and configuration assessments, environmental assessments, and all other inspections of the Sites to determine that the Sites can support the installation and interconnection of the Systems. Installer must visit the Sites to ascertain site conditions, accuracy of provided drawings and feasibility of design. Installer shall be soleresponsible to ensure that each Site’s soil conditions and terrains are favorable for the Project.

Although Site Host may provide historical information regarding the Sites, Site Host makes no representation as to the accuracy of the information about the Sites provided in the request for proposals package or otherwise, including data, drawings and reports developed by third parties. Except as otherwise provided in the Agreement with respect to information provided by Site Host, Installer shall rely solely on its own due diligence to discover and confirm existing conditions at the Sites. However, Installer shall not be liable for hidden or latent defects in the site conditions. Installer shall report any discovered and previously unknown site conditions of a substantial nature to Site Host within five (5) days of discovery.

Installer shall be solely responsible for ensuring the existing electrical distribution equipment at the Sits, including but not limited to the main service switchgear and Distribution Utility transformer, will support the interconnection of the Systems. Installer is responsible for all scope, costs and designs relating to upgrades to the existing electrical system required to accommodate the Systems installation and interconnection, and has included these upgrades in its scope, costs and design drawings.

Installer shall confirm that the Systems will be interconnected to the correct meter at each Site by validating the meter and service account identification numbers (“SAID”) with the Distribution Utility.

Installer is responsible for any upgrades to the existing structures and/or structural blocking required to accommodate the loads imposed and mechanical attachments required by the Systems and has included those changes in their scope, costs and design drawings.

Site Host operates under several environmental permits issued by various agencies. To the extent that Site Host has provided such a permit to Installer in advance of the Effective Date of the Agreement, and due to an action, inaction, or negligence by Installer, Site Host becomes subject to non-compliance penalties, the cost of such penalties shall be borne by Installer.

Installer shall identify if any third-party site assessments are required and be responsible for obtaining all required studies at their sole cost and expense. Installer shall assume any and all costs and risks associated with physical Site conditions, real estate constraints and environmental site assessment as mutually agreed between the parties. Reports which may be required to be obtained by Installer at Installer’s judgment (unless otherwise noted below) and at the Installer’s sole cost include, but are not limited to:

• Structural Report
• Geotechnical Report
• Title Reports and/or American Land Title Association (“ALTA”) Surveys • Boundary Surveys
• Topographic Surveys
• Underground Utility Survey
• Glint and Glare Study (where applicable)
• Arc Flash Study / Coordination Study
Packet Page 811 of 1189Attachment 2 Page 59 of 159

7 • Site Electrical Service Assessments
• Environmental Studies

These reports must be obtained when requested by Site Host or any other Governmental Authority having jurisdiction.

Permitting, Codes, Regulatory Compliance
Installer shall obtain, oversee and adhere to all required permissions for Project construction and operation by obtaining approvals from all Governmental Authority having jurisdiction over the Project, including, but not limited to the Distribution Utility, incentive authorities, the California Energy Commission (“CEC”), fire safety, California Occupational Safety and Health Administration (“Cal OSHA”), right-of-way permits, easement agreements and other codes and best practices. Specifically, Installer shall obtain and submit all documents to achieve and maintain Permission to Operate with all required Governmental Authorities. In addition to stamped and approved plans, Installer shall provide Site Host with installation compliance confirmation letters from all authorities having jurisdiction within five (5) days of receipt.

In addition, for Sites on public schools, Installer shall be solely responsible for ensuring that the System is constructed in compliance with all applicable laws, regulations, and in accordance with the standards set by any governmental program providing funding for the System, including, but not limited to, where applicable all permits and approvals required by the Division of the State Architect (“DSA”) in any way related to the design, installation, construction and operation of the Systems, including but not limited to any exterior improvements and/or exterior upgrades the DSA may require of the Provider in order for the Systems to comply the Field Act (Education Code §§17280-17317) and American with Disabilities Act (“ADA”). Compliance with The California Environmental Quality Act (“CEQA”)
Installer agrees to coordinate its work with that of any CEQA consultant(s) retained by Site Host, to provide any reasonably available information such as current elevations and schematic drawings for use in CEQA compliance documents, and to incorporate any mitigation measures adopted by Site Host into the Project design.

Procurement
Installer shall procure all equipment and services required for Project design, construction, commissioning, system monitoring, warranties, operation and maintenance, as described in the Agreement and as shown in Site Host-approved final design engineering drawings, specifications and data sheets. Any proposed changes or substitutions must be presented to Site Host in standard submittal format with detailed explanations and instructions for review, comment and approval. Site Host approval of any of the submittals provided by Installer, including drawings, does not excuse Installer from their responsibility to meet all safety requirements, applicable codes and standards requirements, requirements of all Governmental Authorities and the requirements of the Agreement including this General Conditions and Technical Specifications.

Construction
Installer shall conduct all construction and construction management work for the Project, as well as schedule management per the requirements of the Agreement. Any proposed changes that represent a deviation from scope or schedule must immediately be brought to Site Host’s attention for review. All Packet Page 812 of 1189Attachment 2 Page 60 of 159

8 work must be performed and supervised by skilled workers trained and experienced in the installation of the Systems in accordance with equipment manufacturers’ installation requirements. Installer shall effectively manage the schedule and coordinate construction activities around Site Host’s maintenance activities and other construction projects where applicable.

Commissioning
Installer shall conduct all activities required for proper testing and commissioning of the Systems and any related installations/systems. Commissioning will include testing of all systems to ensure proper operations per the design standards and testing parameters. Installer is required to verify that: (i) each of the Systems functions as expected within acceptable parameters and as designed at a nameplate capacity; (ii) meets expected production output; and (iii) meets expected performance requirements described within the Agreement. Installer shall manage all necessary final inspections with all Governmental Authorities having jurisdiction over the Project, the Distribution Utility, Site Host representatives, and any other required inspectors. Installer shall also be responsible for completing the Commissioning Schedule included as Attachment D and submitting it to Site Host for review and approval. Installer will notify Site Host no less than five (5) days prior to the commencement of any testing and/or inspections and Site Host and/or its representative will have the right to observe all such tests and/or inspections. As part of the commissioning activities, Installer must confirm that no negative impacts are experienced by existing facilities that connect or interface with the new installations and systems. Installer shall be solely responsible for resolving all issues that arise.

Distribution Utility Interconnection
Installer is responsible for coordinating and implementing all requirements related to the interconnection of the Systems with the Distribution Utility, which shall include Distribution Utility provided and installed facilities and Site facilities, at Installer’s sole cost and expense. Installer will coordinate with the Distribution Utility and Site Host to meet all milestones for the Project required by any Interconnection Agreement. Installer is responsible for compliance with all milestones, including payment milestones to the Distribution Utility for design and installation services provided by the Distribution Utility. Installer shall be responsible for obtaining written Permission to Operate for the Systems from the Distribution Utility and activate the system to begin operating in compliance with the Agreement. In addition, Installer shall be responsible for all on-going terms, obligations and costs described in the Interconnection Agreement, and any other necessary permit signoffs from any Governmental Authorities having jurisdiction over the Project, to operate the Systems in parallel with the Distribution Utility grid.

Installer shall also be responsible for coordinating the desired rates and tariff changes with the Distribution Utility for each of the Systems. Desired rates and tariffs for each Distribution Utility meter are defined in the Site Assessment Table. Installer will be responsible for ensuring that each of the Systems meets the requirements for inclusion in the desired rates and tariffs and will promptly inform Site Host if there is any discrepancy between such requirements and the specifications for each of the System set forth in the Agreement. Rate and tariff changes shall occur as soon as possible following Permission to Operate. Installer shall be responsible for ensuring that the rate and tariff change has taken place for each Distribution Utility meter and providing confirmation of the rate and tariff change to Site Host.

Criminal Background Check
Packet Page 813 of 1189Attachment 2 Page 61 of 159

9 For any and all public school Project Sites, Installer shall comply with applicable provisions of the Agreement and laws, including Education Code sections 45125.1 and 45125.2, relating to criminal background checks for its employees.

3. ENGINEERING AND DESIGN REQUIREMENTS
Installer shall, at its own cost and expense, (i) design, prepare and cause to be sealed all drawings and Engineering Design Packages, perform engineering studies and estimates and attend meetings as may be required (or arrange for design and engineering pursuant to a subcontract executed in accordance with the Agreement), for the construction of the Project and interfaces required by the Distribution Utility including, without limitation, sizing of equipment, communication systems and components, preparing specifications and calculations for equipment and material to be included in the Project, completing the work in accordance with the Agreement, providing administration and other services and items required to complete and deliver to Site Host and Distribution Utility the design and Engineering Design Packages, calculations, studies, and drawings necessary to construct a fully integrated and operational Project, and (ii) provide services, attend meetings and prepare all necessary documents and permit applications required to obtain all Governmental Approvals, including, without limitation, coordinating with the Governmental Authorities, the Distribution Utility and other agencies regarding Governmental Approvals necessary for the completion of the Project, completing the permitting process beginning from the permit application through to final approval and receipt of all applicable permits, all in accordance with the Agreement and its exhibits, applicable law, Governmental Approvals, Site Host requirements, Distribution Utility requirements, Engineering Design Packages, industry standards, the actual condition of the Sites and all requirements to be sufficient, complete and adequate in all aspects to enable the Systems to meet all operational requirements and obligations as outlined in the Agreement matching the warranty period for each of the Systems.

Design Codes
The Project shall be designed and installed in accordance with the relevant edition enforced by the Governmental Authority having jurisdiction of all applicable codes, standards, and recommendations including but not limited to the following agencies:

• ACI – American Concrete Institute
• AISC – American Institute of Steel Construction
• ANSI – American National Standards Institute.
• ASCE – American Society of Civil Engineers
• ASME – American Society of Mechanical Engineers
• ASTM – American Society for Testing and Materials
• CAL OSHA – California Occupational Safety and Health Administration • CBC – California Building Code
• CEC – California Electrical Code
• CFC – California Fire Code
• CSI – California Solar Initiative
• Distribution Utility Manuals and Standards
• DSA – Division of the State Architect for public schools • ETL – Electrical Testing Laboratories
• IAEI – International Association of Electrical Inspectors • ICEA – Insulated Cable Engineer’s Association
• IEEE – Institute of Electrical and Electronic Engineers Packet Page 814 of 1189Attachment 2 Page 62 of 159

10 • IPMVP – International Performance Measurements and Verification Protocol • NEC – National Electrical Code
• NEMA – National Electrical Manufacturers Association
• NESC – National Electrical Safety Code
• NETA – National Electrical Testing Association
• NFPA – National Fire Protection Association codes, including but not limited to o NFPA 101 – Life Safety Code
o NFPA 855 – Standard for the Installation of Stationary Energy Storage Systems • UL – Underwriters Laboratories
General Requirements

3.1.1 Licensing
(a) In all cases, engineers are to be properly licensed by the State of California. (b) Site Host requires a minimum of a Class B and Class C-10 license be held by Installer and/or their subcontractors.
(c) Electrical, geotechnical, civil, structural and other engineering designs and reports are to be stamped and signed by a licensed engineer.

3.1.2 Solar Photovoltaic (“PV”) Panel Orientation and Shading (a) Solar PV panels will have a minimum shade free window between the hours of 10:00AM and 4:00PM (local time) on the winter solstice. (b) Orientation of the solar PV panels shall be optimized for maximum financial benefit, but in all cases with an azimuth between 180 and 270 degrees unless otherwise explicitly approved by Site Host in writing.
(c) Installer shall provide a PVSyst report in PDF and excel 8760 format at every stage of the design that shows that the Solar Facility design and installation will meet the Annual Production Estimate.

3.1.3 Site and General System Requirements
(a) Inverters and batteries shall not be placed in locations subject to exposure to direct sunlight between the hours of 10:00AM and 4:00PM. Where inverters must be placed in locations that would be subject to direct exposure to sunlight during this window of time, they shall be provided with shade coverings or otherwise protected from continuous exposure to the sun.
(b) Where applicable, the Project shall require a study, recommendations and stamp and sign off from a licensed structural engineer and a licensed geotechnical engineer. (c) Sufficient access pathways and space shall be provided to and around all existing rooftop equipment to allow for ongoing maintenance of the equipment. (d) All roof penetration flashing and sealing methods are to be determined, designed and implemented in accordance with the requirements of Site’s roofing Installer and/or roofing consultant. All Site roof warranties shall be preserved. (e) Where the solar PV panels are part of a ground mounted installation, Installer shall clear and grade the site substantially in accordance with the site grading plans. All vegetation inside the array boundaries shall be permanently removed. (f) The low-end clearance of ground mounted solar PV panels shall be a minimum of two feet (2’) above grade.
(g) Ground mounted solar PV panels shall include sufficient drive aisles to maintain the equipment and perform washing, including access for vehicles and cranes as needed to remove and replace equipment.

Packet Page 815 of 1189Attachment 2 Page 63 of 159

11 (h) All roads shall be designed and installed for all weather access. (i) Installer shall address all Americans with Disabilities Act (“ADA”) requirements when installing Solar Facility as part of shade structures. Installer shall be responsible for all costs associated with any ADA upgrades required.
(j) Equipment pads shall be protected by bollards. Bollards shall be permanent unless removable bollards are required to facilitate access to equipment. (k) Installer shall provide erosion control, weed abatement, and security for the Site throughout construction. Installer shall remove any weeds via mechanical removal methods only.
(l) Installer shall be responsible for creating and performing all requirements of a Storm Water Pollution Prevention Plan (“SWPPP”), dust control plan, pollution mitigation plan, and all other plans required by all Governmental Authorities. At a minimum, any earthwork-related or fine grading activities are to be conducted at such times that minimize construction-related fugitive dust.
(m) If adequate site fencing or equivalent is not in place, equipment pads, disconnect switches and all other equipment which is at risk for tampering shall be fenced. Fencing shall be eight feet (8’) high with two inch (2”) galvanized steel chain link fabric where in accordance with all local requirements. Fenced equipment pads shall have slats placed in the chain links of a color determined by the Site Host. (n) Ground mounted Solar Facility arrays shall be fenced in accordance with the NEC, NESC and requirements of any Governmental Authority and shall include provisions for at least one locking gate. If adequate site fencing or equivalent is not in place, the fencing around ground mounted Solar Facility installations shall provide for a sixteen foot (16’) wide clearance to allow for vehicular access and to limit shading impact on the solar PV panels.
(o) Locks for all gates and electrical enclosures to be provided by Installer but must be approved by Site Host prior to procurement. All gates shall include provision for Site Host and Installer locks to allow for access by each entity. (p) Equipment pads shall be provided with two (2) 120VAC, 20A GFCI receptacles where alternative outlets are not readily available.
(q) Installer will evaluate whether the Site is in a floodplain and take appropriate precautions to prevent water damage to the Project, including determining and installing the Systems including all electrical enclosures and all other materials to be used in the Project at the appropriate height above grade to be above the 1-percent- annual-chance flood elevation.
(r) Lighting requirements for Solar Facility and other Project equipment locations shall be discussed with the Site Host during design, and any lighting locations and fixture specifications shall be mutually agreed upon.
(s) An arc flash study shall be performed by Installer. All required equipment labeling, fault current and coordination analysis, and recommendations for proper personal protective equipment (“PPE”) shall be followed in accordance with the results of the arc flash study.
(t) Geotechnical studies, where required, must include soil corrosivity and thermal resistivity testing and evaluation. All work must include consideration for the results of the testing and evaluation.

3.1.4 Conduit and Wiring
(a) All conductors shall be in conduit. Installer shall not direct bury conductors unless explicitly approved by Site Host in writing. All conduits shall be installed according to the requirement of the NEC and all Governmental Authorities. (b) Buried conduit shall be PVC and shall be covered and encased per NEC requirements.

Packet Page 816 of 1189Attachment 2 Page 64 of 159

12 (c) All below grade horizontal and vertical bends of PVC conduit shall use long radius elbows. Bending of straight PVC conduit to avoid installation of long radius elbows will not be allowed.
(d) Vertical risers of buried or encased PVC conduit shall transition to the metallic conduit type specified below no higher than twelve inches (12”) above grade or top of concrete.

Any exposed PVC shall be Schedule 80. If transition to metallic conduit is installed as soon as or just before the conduit is no longer buried or encased, use the appropriate conduit adapter and wrap metallic conduit in 10mil corrosion protection tape where exposed to soil or concrete.
(e) Where exiting from the ground, all conduits shall enter enclosures from below and be made watertight. Finish with a silicone sealing compound. (f) All above ground conduit shall be electrical metallic tubing (EMT) where corrosion is not a concern, and rigid galvanized steel (RGS) where corrosion is a concern. (g) All conductors 8 AWG or smaller shall be copper. Code compliant aluminum conductors may be used for conductors larger than 8 AWG. All wiring that interfaces with any of Site Host’s equipment must be copper.
(h) All wiring used for grounding shall be copper.
(i) Ground lugs shall be mechanical or irreversible crimp, rated for direct burial, listed to UL 467 and/or UL 2703 and suitable for use with copper conductors. (j) Unless otherwise approved by Site Host in advance, Solar Facility modules shall be grounded with hardware listed to UL 2703. Solar Facility module grounding shall be in accordance with all requirements of the NEC and the Governmental Authority. (k) All wiring shall be minimally rated to handle the voltage and current of the designed system.
(l) All wiring shall be listed and labeled by a Nationally Recognized Testing Laboratory (“NRTL”) in accordance with Underwriters Laboratories standards for its purpose and location.
(m) Solar PV panel string wire shall be UL listed and be appropriately rated for UV exposure where required.
(n) All DC wire, other than module-to-module wire in a string that is spanning a gap less than three inches (3”) wide shall be located in conduit. (o) The Solar Facilities shall be equipped with DC arc-fault protection in accordance with the NEC.
(p) Where there are more than two DC strings in parallel on an MPPT, DC wiring shall be protected by overcurrent protection rated for DC circuits and marked by the manufacturer for use in solar. Fuses shall be listed and labeled by an NRTL in accordance with UL 2579.
(q) All termination equipment shall be rated for the conductor type, temperature, current and voltage of the conductor being terminated.
(r) Locking connectors shall mate with solar PV panel terminations and shall be certified compatible by the manufacturer of the locking connector provided with the solar PV panel.
(s) All conductors used for communication will be shielded cable with a drain. (t) Communications wiring shall be in separate conduits from the high voltage DC and AC wiring with sufficient separation to prevent interference. (u) Worst-case DC voltage drop shall be limited to 2.0% unless otherwise explicitly approved by Site Host in writing. The circuit shall be defined as all wiring from the solar PV panel connectors to the DC input terminals at the inverter. Installer shall account for all horizontal and vertical distances and all wire gauge transitions. (v) Worst-case AC voltage drop for an individual inverter shall be limited to 2.0% for the Battery System and 2.5% for the Solar Facilities at maximum power, and weighted Packet Page 817 of 1189Attachment 2 Page 65 of 159

13 average AC voltage drop shall be limited to 2.0% at maximum power, unless otherwise explicitly approved by Site Host in writing. The circuit shall be defined as all wiring from the inverter output to the Delivery Point. Installer shall account for all horizontal and vertical distances and all wire gauge transitions.

3.1.5 Electrical Tie-In
(a) The Production Meter for the Systems shall be identified on the preliminary and final drawings and shall be located within ten (10’) feet of the Delivery Point unless an alternative location is approved in writing by Site Host. (b) Where needed, in lieu of providing and installing a Net Generation Output Meter (“NGOM”) on each existing and new Solar Facility, Installer may provide, install and program a UL 1741 CRD listed Power Control System (“PCS”) that is capable of demonstrating to the Distribution Utility that the Battery System either does not export energy to the grid or is 100% charged by the Solar Facility, thereby ensuring that the Solar Facility will receive full net energy metering (“NEM”) credits from the Distribution Utility. Installer is responsible for all scope, costs and designs relating to the PCS.
(c) Where needed, if Installer is unable to gain approval from the Distribution Utility for their proposed PCS as described above, A Net Generation Output Meter shall be provided for each Solar Facility in accordance with the Distribution Utility requirements. Installer is responsible for all scope, costs and designs relating to any NGOM. Installer must coordinate installation of the NGOM with existing Solar Facility owner for Sites that have a Solar Facility.
(d) Where financially beneficial for the Project, the PCS shall be configured to limit net export to minimize Distribution Upgrade costs.
(e) Should relocation of any circuit breakers be required to meet requirements of the Agreement, all scope, costs and designs are the responsibility of Installer. (f) If motorized circuit breakers or similar equipment is required to isolate the electrical loads from the Distribution Utility for islanded Microgrid operation, all scope, costs and designs are the responsibility of Installer.
(g) If motorized circuit breakers or similar equipment is required to isolate non-critical loads from the islanded Microgrid, all scope, costs and designs are the responsibility of Installer.

3.1.6 Structural
(a) Structural engineers shall determine all code requirements and the Project shall be designed and installed in accordance with the latest edition of all applicable codes and standards.
(b) Structural engineers shall perform a structural review of the existing structures and mechanical attachment details for all equipment to be located on the roof. (c) Equipment pads shall be a minimum of six inches (6”) of concrete reinforced at twelve- inch (12”) intervals with #5 rebar unless otherwise directed by the structural engineer.

Equipment pad layouts shall include adequate spacing to accommodate maintenance activities for all equipment. A housekeeping pad elevated three inches (3”) above the remaining pad surface will also be required.
(d) Where electrical enclosures will be mounted vertically to Solar Facility structural posts or other supports, two feet (2’) minimum ground clearance and appropriate working clearances as required per NEC shall be maintained. In no case shall equipment locations create shade on any Solar Facility between the hours of 10:00AM and 4:00PM (solar time) on the winter solstice.

Packet Page 818 of 1189Attachment 2 Page 66 of 159

14 (e) Structural engineers are to specify the grade of steel used in all support structures. Mill certifications showing the identification of the steel to be used on the Project and the quality thereof shall be provided to Site Host. Mill certifications shall be checked by Installer prior to accepting delivery of any steel.

Engineering Design Packages and Project Execution Plan
Installer and its subcontractors (as applicable) shall prepare and submit to Site Host for their review and approval all drawings, assessments, reports, specifications, and all other necessary documents setting forth in detail all requirements for the construction of the Project. Installer shall prepare Preliminary, 50%, 90% and 100% Engineering Design Packages as described herein. All engineering and installation drawings shall comply with current construction standards, codes and regulations, and adhere to all requirements of the Agreement. The system design will comply with all applicable laws and regulations. Site Host approval of any of the submittals provided by Installer, including drawings, does not excuse Installer from their responsibility to meet all safety requirements, applicable codes and standards requirements, requirements of all Governmental Authorities and the requirements of the Agreement including this General Conditions and Technical Specifications.

Engineering Design Packages shall at a minimum contain the information as outlined below for each milestone.

3.1.7 Preliminary and 50% Engineering Design Packages
(a) Design Drawings depicting and identifying at a minimum:
(i) Solar Facility layout, where applicable
(ii) Tilt and azimuth for all Solar Facility, where applicable (iii) The proposed locations of all other major Solar Facility equipment including but not limited to electrical point of connection, disconnects, panelboards, inverters, meters and dataloggers, where applicable
(iv) The proposed locations of all major Battery System equipment including but not limited to electrical point of connection, disconnects, transformers, panelboards, inverters, batteries, meters, controllers and dataloggers, where applicable
(v) The locations of all major existing equipment, including but not limited to Distribution Utility transformer and meter, main electrical service switchgear, System electrical point of connection(s), disconnects, panelboards, inverters, arrays, meters and dataloggers.
(b) Product data sheets and copies of manufacturers’ warranties for all major pieces of equipment.
(c) Completed System Site Assessment Table in native and PDF formats. (d) Where applicable, PVSyst energy production modeling report in PDF format and 8760 output file in MS Excel format. The energy production model report and 8760 output files must be in the same format and use the same assumptions as those used to determine the inputs to the Agreement.
(e) Where applicable, Battery System performance modeling report in 4x8760 output file in MS Excel format.
(f) System performance report detailing the Critical Loads and Estimated Microgrid Operation Duration, where applicable.

3.1.8 90% and 100% Engineering Design Packages
(a) All information required above for the Preliminary and 50% Engineering Design Packages, updated at each milestone.

Packet Page 819 of 1189Attachment 2 Page 67 of 159

15 (b) A full set of Design Drawings as described in a subsequent section. (c) All required drawings, assessments and reports stamped and signed by an engineer licensed in the appropriate discipline – structural details shall not be stamped by an electrical engineer.
(d) Where applicable, full structural details of the solar PV panel mounting system, Battery System pad and anchorage, equipment support racks and anchorage, fencing design and associated calculations.
(e) Microsoft Project or equivalent construction schedule (providing Gantt chart output) showing milestones, equipment order and delivery dates, and staffing requirements.

Specific milestones such as conduit installation completion, material arrival dates, interconnection date, and commissioning timeline, shall be highlighted. (f) A list of those changes made from the original proposal with the reasons therefore.

The Engineering Design Packages will be reviewed by Site Host. Comments shall be delivered to Installer within ten (10) business days of submission for review. Ensuring that the Project complies with all requirements and will be installed to meet all requirements of the Agreement remains the sole responsibility of Installer.

3.1.9 Project Execution Plan
A complete Project Execution Plan for each Site shall be provided for review, which shall at a minimum address the following:

(a) Material storage location
(b) Lay-down and layout yard location
(c) Site office location
(d) Access and mobilization
(e) Crane locations and traffic control
(f) Method of installation
(g) Human resources and staffing
(h) Communications
(i) Anticipated Project risks

The Project Execution Plan shall be reviewed and approved prior to any work being performed on the Sites. The Project Execution Plan shall be submitted as soon as reasonably possible, and no later than two (2) days after the 90% Engineering Design Package due date.

Design Drawings
A drawing summary list shall be maintained by the Engineer of Record for tracking drawings and revisions thereof over the design and construction period, and the list shall be provided to Site Host on a bi-weekly basis or as requested. All Design Drawing submittals shall be according to the following:

3.1.10 Format
(a) All drawings shall include a title block which at a minimum contains the Project name, Site address, Site Host logo, where applicable the DSA Identification stamp, Installer’s name, engineer’s stamp, engineer’s name and drawing revision table. (b) Any changes in the Engineering Design Packages from one Site Host submittal to the next shall be clouded.
(c) Redlines shall be maintained on a not more-than-weekly basis. As-built drawings shall be completed in a reasonable amount of time following the Governmental Authority final inspection and sign off.

Packet Page 820 of 1189Attachment 2 Page 68 of 159

16 3.1.11 Content
The descriptions of the sheets and sheet contents below shall be considered the minimum requirement. Additional sheets and details shall be included as needed to describe the project in adequate detail for construction and permitting needs.

(a) Title Page
Information on the title page shall include, but not be limited to the following:
(i) Location of the Site
(ii) Amount of land area to be occupied by the Project, expressed in square feet or acres as appropriate
(iii) Project directory including contact information for all engineers, designers and consultants
(iv) Index of drawings
(v) Applicable codes and standards list including most recent CEC/NEC (vi) A scope of work narrative description
(vii) System size, which shall include kWDC, kW CEC-AC and kWAC for any Solar Facility, and kWAC and kWh for any Battery System (viii) Existing Solar Facility size (kWDC and kWAC), where applicable (ix) Interconnection type (NEM-PS, NEM-A, Rule 21)
(x) Solar Facility module manufacturer, part number and quantities (proposed and existing where applicable), where applicable
(xi) Solar Facility inverter manufacturer, part numbers and quantities (proposed and existing where applicable), where applicable
(xii) Solar Facility module mounting hardware description (ballasted roof mount, ground mount, shade structure mount etc.), where applicable (xiii) Battery manufacturer, part numbers and quantities, where applicable (xiv) Battery System inverter manufacturer, part numbers and quantities, where applicable
(xv) All other information required by all Governmental Athuorities and not explicitly listed here
(xvi) Benchmarking / survey control data as applicable

(b) Architectural Site Plan
Information on the site plan shall include, but not be limited to the following:
(i) Property lines
(ii) Required setbacks and/or yards
(iii) Easements
(iv) Existing buildings and structures
(v) Proposed locations of Major Equipment
(vi) Building code analysis justifying proposed equipment placement (vii) Separation distances
(viii) Fire access requirements
(ix) Modifications for ADA compliance, where applicable

(c) Single Line Diagrams
The single line diagrams shall accurately depict the physical electrical connections (i.e., quantity, type, and size of conductors, quantity, size, and type of conduit) between all electrical equipment used in the system. Information on the single line diagrams shall include, but not be limited to the following items:
(i) System size, which shall include kWDC, kW CEC-AC and kWAC for any Solar Facility, and kWAC and kWh for any Battery System Packet Page 821 of 1189Attachment 2 Page 69 of 159

17 (ii) Existing Solar Facility system size (kWDC and kWAC), where applicable (iii) Interconnection type (NEM-PS, NEM-A, Rule 21)
(iv) Solar Facility module manufacturer, part number and quantities (proposed and existing where applicable), where applicable
(v) Solar Facility inverter manufacturer, part numbers and quantities (proposed and existing where applicable), where applicable
(vi) Battery manufacturer, part numbers and quantities, where applicable (vii) Battery System inverter manufacturer, part numbers and quantities, where applicable
(viii) Distribution utility transformer, including size (ix) Distribution utility meter, including meter number and SAID (x) Main electrical service switchgear, including bus amperage, main service disconnect amperage, voltage rating and interrupt rating (xi) Solar Facility electrical point of connection, disconnects, panelboards, inverters, arrays, meters and dataloggers, where applicable (xii) System interconnection tie-in scheme
(xiii) All AC and DC disconnects including wiring and fusing within disconnects (xiv) All overcurrent protection device sizing
(xv) Switchgear, including bus amperage, main over current protection device (“OCPD”) amperage, voltage rating and interrupt rating
(xvi) Transformers, including kVA, primary and secondary voltages (xvii) Solar Facility modules, inverters and batteries
(xviii) Number of Solar Facility modules per string
(xix) Number of Solar Facility strings for each inverter and/or combiner box (xx) String labels per array or subarray
(xxi) Net Generation Output Meter, Solar Production Meter, Battery System meter, Facility Load meter and any other meters, where applicable (xxii) Wire type, conductor material, size and quantity used for each run (xxiii) Conduit type, size and quantity of wires in each conduit for each run (xxiv) Total wire length for each run
(xxv) Complete electrical calculations, including voltage drop, OCPD and wiring ampacity, and Solar Facility string voltage
(xxvi) Monitoring data communications and power wiring
(xxvii) Controls diagram including low voltage, low current and power wiring (xxviii) Security camera data communications and power wiring, where applicable (xxix) Lighting, convenience outlets, and any auxiliary power circuit wiring and equipment where applicable
(xxx) Make and model of all Major Equipment

(d) Electrical Site Plan and Electrical Details
Information on the electrical layouts and details shall include, but not be limited to the following:
(i) Plan view of locations of all electrical equipment shown on the Single Line Diagrams described above
(ii) Location of the point of interconnection
(iii) Enlarged views of the Battery System area, any other electrical equipment pads, and main electrical service area
(iv) Elevation views of all electrical equipment
(v) Locations of conduit runs
(vi) Locations and sizing of spare conduits
(vii) Solar Facility string map per array or subarray
Packet Page 822 of 1189Attachment 2 Page 70 of 159

18 (viii) Safety label details (including, but not limited to, arc flash)

(e) Grounding Diagram
All electrical equipment shall be depicted, including their capacity/rating, manufacturer, part number, quantity, and reference designator where applicable.

Diagram shall indicate equipment grounding connection points and grounding conductor size. Equipment shall include but not be limited to the following:
(i) Solar Facility Modules
(ii) Solar Facility Inverters
(iii) Batteries
(iv) Battery System Inverters
(v) Transformers
(vi) Switchgear
(vii) AC and DC disconnects
(viii) Main electrical service switchgear
(ix) Meters
(x) Control and Monitoring equipment
(xi) Distribution panelboards

(f) Structural and Civil Sheets
Information on structural and civil sheets shall include, but not be limited to the following:
(i) Equipment pad(s) structural details
(ii) Equipment mounting rack structural details
(iii) Equipment anchorage design
(iv) Fence design and structural details
(v) All civil work details

4. EQUIPMENT
The System is intended to be in operation for the full warrantied period of the Major Equipment, therefore, the life cycle costs (capital expenditures and operating and maintenance expenses) for all installations and systems must be considered in selection criteria for all materials and equipment. Installer shall purchase and cause to be delivered to each Project Site all equipment and materials required for the Project and as described in Site Host-approved final Engineering Design Package, specifications and data sheets and as required to construct a fully functioning Project. Any proposed changes or substitutions must be presented to Site Host in standard submittal format with detailed explanations and instructions for review, comment and approval. Minimum requirements for equipment are described below. Site Host approval of any of the submittals provided by Installer, including drawings, does not excuse Installer from their responsibility to meet all safety requirements, applicable codes and standards requirements, requirements of all Governmental Authorities and the requirements of the Agreement including this General Conditions and Technical Specifications.

Standards
All components shall be designed, manufactured, tested and listed in accordance with the latest applicable standards of NEMA, ANSI, NEC, IEC and UL. Installer shall verify listing and labeling of equipment by a NRTL prior to installation. In all cases NEC and Governmental Authority rules shall apply.

Packet Page 823 of 1189Attachment 2 Page 71 of 159

19 Factory Testing
Any equipment that is required to be factory tested to an applicable standard shall be accompanied by the results of those factory tests, and further those results will be submitted to Site Host as part of the Final Binder.

Acceptance and Care
Equipment shall be stored, handled and installed in accordance with manufacturer’s requirements.

Material received shall be identified by serial number. A report recording make, model and serial numbers of the material and equipment received shall be prepared and shall be forwarded to Site Host within ten (10) days of the material and equipment being received.

NEMA Rating
Enclosures mounted outdoors shall be rated a minimum of NEMA 3R. If any Site is within two (2) miles of any body of salt water or other potentially corrosive water, enclosures shall be NEMA 4X in stainless steel and all other enclosures exposed to the elements shall be NEMA 4X.

Nameplates and Labeling
All Major Equipment, panels, boxes, and associated equipment shall be clearly labeled. Reference ANSI Z535.4-2011 for guidelines describing suitable font sizes, words, colors and symbols for labels.

Nameplates and map placards shall be engraved phenolic placards made of red stock with white lettering sized appropriately for the size and purpose of the label. Installer shall submit the proposed labels for approval prior to installation. The following minimum labeling shall be installed:

A. Install engraved signs for instruction and warning identifying that the Systems are operational on the premises at appropriate locations and that there are potentially multiple power sources on the premises – submit wording and location to Site Host for approval. In all cases NEC and Distribution Utility requirements shall dictate.

B. Install all required signage per NEC (including arc flash requirements per NEC Article 110).

C. Install engraved phenolic placards identifying emergency disconnecting means.

D. Where applicable, provide identification of all Solar Facility DC power circuits on switches, combiner boxes and/or inverters. Clearly identify individual Solar Facility module strings within the equipment at which they terminate. Use appropriate wire color codes (i.e., red and black) for positive and negative conductors.

E. Solar Facility modules must include serial numbers in such a position as to be easily visible after installation.

Products – Approved Manufacturers and General Product Requirements Only products that meet the requirements below shall be used in the construction of the Project, unless otherwise explicitly approved in writing by Site Host.

4.1.1 Approved Solar Facility Modules

Please refer to Attachment F: Major Equipment

4.1.2 Approved Solar Facility Module Manufacturer
Packet Page 824 of 1189Attachment 2 Page 72 of 159

20 Please refer to Attachment F: Major Equipment

Site Host’s General Guidelines for Solar Facility modules • Thin‐film, concentrating solar technologies, etc. technologies are not accepted by Site Host.
• All Solar Facility modules must be included on any required rebate‐related approved module list as well as on the California Energy Commission’s (“CEC”) List of Eligible Photovoltaic Modules.
• All Solar Facility modules shall be listed on the most recent Tier 1 Solar Panels List as determined by BloombergNEF.
• All Solar Facility modules must have anti-reflective (AR) glass surfaces. • All Solar Facility modules used on the Project shall include a minimum twenty- five (25) year linear power output warranty and a minimum ten (10) year product warranty.
• All array layouts, Solar Facility module related submittals, and Solar Facility module data sheets must include cell and module efficiency ratings, and define the guaranteed production degradation over the warranted life of the module. • Installer will provide flash test data for all Solar Facility modules to Site Host in MS Excel format upon procurement of Solar Facility modules. Site Host, at its sole discretion, may randomly select up to fifty (50) Solar Facility modules for delivery to a third-party for quality verification testing. The costs of such verification testing shall be the responsibility of Site Host.

4.1.3 Approved Solar Facility Inverter Manufacturer

Please refer to Attachment F: Major Equipment

Site Host’s General Guidelines for Solar Facility Inverters Central and string inverters with a maximum input voltage of 1,000VDC are allowed where in compliance with the NEC for rooftop and shade structure mounted Solar Facility. For rooftop mounted Solar Facility, the inverter shall be certified compatible with the Approved Rapid Shutdown solution described in a subsequent section, and shall have the rapid shutdown initiation device integrated.

Central and string inverters with a maximum input voltage of 1,500VDC are allowed where in compliance with the NEC for ground mounted Solar Facility. Microinverter solutions may be proposed. All inverters must be included on any required incentive- related approved inverter list as well as on the CEC’s List of Eligible Inverters.

Inverters must meet all Distribution Utility requirements. All inverters must have a minimum 20-year warranty.

Inverter Manufacturer Preventative Maintenance and Support Services Site Host requires preventative maintenance support services which may be provided by Installer or the inverter manufacturer, as well as comprehensive and highly responsive repair service offerings. In addition, Site Host will be monitoring the inverters’ performance remotely, and require that the inverters utilize an open interface and documented protocols for third party monitoring software.

Packet Page 825 of 1189Attachment 2 Page 73 of 159

21 4.1.4 Approved Mounting Hardware – Ground Mount

Please refer to Attachment F: Major Equipment

Site Host’s General Guidelines for Solar Facility Module Mounting Hardware for Ground Mounts
Ground mounted fixed tilt Solar Facility module mounting systems shall be NRTL listed to UL 2703. Ground mounted tracking systems shall be NRTL listed to UL 3703.

The Approved Solar Facility Modules listed above shall be on the tested and approved Solar Facility module list maintained by the mounting system manufacturer to ensure compatibility with the mounting system’s integrated grounding components. Ground mounted arrays shall meet all DSA requirements.

Site Host requires that all Solar Facility module mounting solution descriptions clearly identify the mounting hardware and any engineering services related to the mounting solution. Installer shall provide full mounting solution specifications, warranty details, etc.

4.1.5 Approved Battery System Inverter Manufacturer

Please refer to Attachment F: Major Equipment

Site Host’s General Guidelines for Battery System Inverters All Battery System inverters must be included on any required incentive‐related approved inverter list. Inverters must meet all Distribution Utility requirements. All inverters must have a minimum ten (10) year warranty.

Inverter Manufacturer Preventative Maintenance and Support Services Site Host requires preventative maintenance support services which may be provided by Installer or the inverter manufacturer, as well as comprehensive and highly responsive repair service offerings. In addition, Site Host will be monitoring the inverters’ performance remotely, and require that the inverters utilize an open interface and documented protocols for third party monitoring software.

4.1.6 Approved Battery Manufacturer

Please refer to Attachment F: Major Equipment

Site Host’s General Guidelines for Batteries
Lithium-ion battery chemistry is preferred. Lead acid battery chemistries are not acceptable. All batteries must have a minimum ten (10) year warranty.

Battery Manufacturer Preventative Maintenance and Support Services Site Host requires preventative maintenance support services which may be provided by Installer or the battery manufacturer, as well as comprehensive and highly responsive repair service offerings.

4.1.7 Approved Data Acquisition System

Please refer to Attachment F: Major Equipment
Packet Page 826 of 1189Attachment 2 Page 74 of 159

22 4.1.8 Performance Monitoring and Reporting Service Installer

4.1.9 EPC Partner/AlsoEnergyInverter Monitoring Installer

EPC Partner

4.1.10 Approved Solar Facility Module Temperature Sensors

AlsoEnergy

4.1.11 Approved Ambient Temperature Sensors

AlsoEnergy

4.1.12 Approved Irradiance Sensors (Pyranometers)

AlsoEnergy

4.1.13 Approved Wind Speed and Direction Sensors

AlsoEnergy

4.1.14 Approved Battery System Meter

AlsoEnergy

4.1.15 Approved Solar Production Meter

AlsoEnergy

4.1.16 Approved Safety Switches

Eaton

4.1.17 Approved Transformers

EPEC Solutions

Site Host’s General Guidelines for Transformers
Any dry-type transformers shall meet the latest Department of Energy efficiency requirements, shall have copper windings, 220°C insulation rating and 115°C maximum temperature rise rating.

Any oil-filled transformers shall be filled with a non-toxic, non-bioaccumulating, biodegradable fluid.

4.1.18 Approved Grounding Devices

Calpico, Eritech, Galvan, Nehring
Packet Page 827 of 1189Attachment 2 Page 75 of 159

23 5. COMMUNICATIONS AND MONITORING SYSTEMS

Installer is responsible for the complete and fully functional installation and operation of the SCADA system. Any labor, communications devices, wiring and or other materials shall be included in Installer’s cost and scope. The SCADA system shall meet all the requirements outlined in the Agreement.

Performance Monitoring & Reporting Service
Installer shall provide a Performance Monitoring and Reporting Service (“PMRS”) as part of the SCADA system to monitor and collect data from the Facility Load Meter, Critical Load Meter, Battery System Meter, Solar Production Meter, inverters, batteries, and all other data points applicable to the operation of the Systems. Installer shall be responsible for procuring, installing, and commissioning all SCADA equipment, and for entering into a contract with a third-party Performance Data Installer (“PDP”). The monitoring service requirements are as follows:

A. Installer shall provide operator and administrator level training to Site Host for using the PMRS software interface as part of commissioning activities.

B. The PMRS software interface must allow for access via a link from Site Host’s website and must allow the users to view and download real-time and historical electricity usage, solar production, and Battery System power flow data, where applicable, at each Project Site over a variety of timescales including but not limited to a minimum of a year of fifteen (15) minute interval data. Installer shall coordinate and obtain approval of all data points to be displayed on the public webpage with Site Host prior to implementation.

C. The PMRS software interface must allow Site Host to programmatically download via an Application Program Interface (“API”) the real-time and historical electricity usage, solar production, and Battery System power flow data, where applicable, at each Project Site over a variety of timescales including a minimum of one (1) year of fifteen (15) minute interval data. The API must include the ability to reference most recent inverter, meter and alarm status readings.

Equipment and Components
Below is a list of the minimum equipment and components that must be included as part of the PMRS.

All equipment shall be installed to equipment manufacturer’s recommendations and best practices for the Systems.

A. Facility Load Meter(s)
Revenue grade energy meters shall be installed to measure the total (not net) energy usage, instantaneous demand, power factor, etc. at each main switchboard where the Systems is interconnected. The load side revenue grade energy meters shall be included as part of the PMRS system, send data through the PDP and be displayed on the PMRS software interface.

B. Critical Load Meter(s)
For projects containing Critical Loads to be serviced by the Battery System, revenue grade energy meters shall be installed to measure the energy usage, instantaneous demand, power factor, etc. at each Critical Load distribution panel. The load side revenue grade energy Packet Page 828 of 1189Attachment 2 Page 76 of 159

24 meters shall be included as part of the PMRS system, send data through the PDP and be displayed on the PMRS software interface.

C. Battery System Meter
For projects containing Battery Systems, revenue grade energy meters shall be installed to monitor power and energy flows of the Battery System at each Site. The Battery System Meter shall be located within ten feet (10’) of the Delivery Point unless an alternative location is agreed to in writing by Site Host. The Battery System Meter shall be included as part of the PMRS system, send data through the PDP and be displayed on the PMRS software interface.

D. Solar Production Meter
For projects containing Solar Facilities, revenue grade energy meters shall be installed to monitor power and energy production of any Solar Facility present at each Site. The Solar Production Meter shall be located within ten feet (10’) of the Delivery Point unless an alternative location is agreed to in writing by Site Host. The Solar Production Meter shall be included as part of the PMRS system, send data through the PDP and be displayed on the PMRS software interface.

E. Datalogger/Internet Gateway

F. Inverter Monitoring
If inverters are not provided with communications as part of the standard package, then the communications option shall be ordered. Where various communication package options exist, those options shall be discussed with Site Host prior to ordering.

G. Solar Facility Array Monitoring
For projects containing Solar Facilities, if DC combiner boxes are installed within the array field and not integral to the Solar Facility inverters, DC monitoring shall be provided for each home run from the combiner boxes to the inverters.

H. Protective Relays, Medium Voltage Circuit Breakers and Transformers All available data points shall be provided through the PMRS system.

I. External Device Communication
Installer must arrange for and provide Site Host a secure and reliable internet connection adequate to allow for uploads of all data points from the PMRS system every fifteen (15) minutes at their sole cost. Installer shall provide this internet connection via a cellular modem with data service. Installer shall make this information available to Site Host through the PMRS system.

Remote Access Monitoring Portal

5.1.1 Power and Energy Data
Each Project Site’s PMRS web portal should display the following minimum information over a variety of timescales:

(a) Battery System inverter instantaneous power (kW)
(b) Battery System state of charge (%)
(c) Battery System instantaneous energy remaining (kWh) Packet Page 829 of 1189Attachment 2 Page 77 of 159

25 (d) Solar instantaneous power output (kW)
(e) Solar energy production (kWh)
(f) Facility entire instantaneous load without the System (kW) (g) Facility instantaneous load net of Solar Facilities (kW) (h) Facility instantaneous load net of Battery Systems (kW) (i) Facility entire energy consumption (kWh)
(j) Critical loads instantaneous load (kW)
(k) Critical loads energy consumption (kWh)
(l) Billing cycle peak demand without the Systems (kW)
(m) Billing cycle peak demand reduction due to the Battery System (kW) (n) Billing cycle peak demand reduction due to the Systems (kW)

5.1.2 Battery System Alarms
For projects containing Battery Systems, each site should have at least the following custom alarms:
(a) Whenever the billing cycle peak demand exceeds the programmed demand threshold set at the beginning of the billing cycle.
(b) The battery state of charge remains below a programmed value for five (5) consecutive days. An example is to set the value to 66% of the Battery System kWh rating in an attempt to identify if/when the Battery System is malfunctioning. (c) Any meter reports a magnitude of less than 0.1 kW for one day.

5.1.3 Solar Facility Alarms
For projects containing Solar Facilities, each site should have at least the following custom alarms:
(a) Inverter produces less than ten percent (10%) of the inverter capacity over the course of an hour between 10:00AM and 3:00PM. The upper limit of the alarm should be set to twice the inverter capacity.
(b) Any meter reports a magnitude of less than 0.1 kW for one hour between 10:00AM and 3:00PM. The upper limit of the alarm should be set to twice the site capacity.

5.1.4 Solar Facility Analytics Pages
For projects containing Solar Facilities, each Solar Facility PMRS should have the following tabs configured in the monitoring analytics page. They should be labeled uniformly at each site. The tabs should be labeled as follows:
(a) Load Profile
(i) Solar Production Meter Power (kW)
(ii) Battery System Meter Power (kW)
(iii) Facility Demand (kW)
(iv) Net Consumption (kW)

(b) Inverter Output
Energy generation (kWh) per inverter. Each inverter shall have a unique identifier matching the naming convention in the as-built drawings.

(c) Predicted Power
(i) Solar Production Meter Power (kW)
(ii) Predicted Power (kW)

(d) Inverter vs. Solar Production Meter Power
Power output per inverter displayed with the Solar Production Meter Power Packet Page 830 of 1189Attachment 2 Page 78 of 159

26 5.1.5 Settings
All System information should be filled out completely and correctly on the monitoring platform to match the as-built drawings and allow for easy identification of equipment and other System information.

6. CONSTRUCTION
Installer is required to conduct all construction and construction management work for completion of the Project. Installer shall perform all work in accordance with generally accepted industry practices, all applicable laws, regulations, codes, rules, ordinances, Government Approvals and permitting requirements, equipment manufacturer’s requirements, and quality control inspection protocols so that the System meets or exceeds (i) all requirements of applicable laws, Government Approvals and licenses; (ii) equipment manufacturer’s installation specifications, and compliance with the terms and conditions of all applicable warranties and guarantees; (iii) complies with all requirements of the Interconnection Agreement; (iv) all established safety protocols for operation and maintenance, and labeling / marking requirements; (v) all requirements of the commissioning procedures and performance validation herein; (vii) all requirements for any applicable federal, state or other environmental or financial rebates and incentives. All work must be performed and supervised by skilled workers trained and experienced in the installation of the Systems in accordance with equipment manufacturers’ installation requirements. Installer is encouraged to utilize local subcontractors and source materials and resources locally should they provide requisite qualifications and competitive advantages.

Site Safety and Security
Installer shall be solely responsible for compliance with all applicable occupational safety and health standards, rules, regulations and orders established by local agencies, the State of California, and Cal OSHA, including obtaining permits required by California Code of Regulations, Title 8, Section 341 and 341(a). In addition, Installer and all subcontractors shall comply with applicable provisions of Federal, State, and municipal safety, health, and sanitation statutes and codes. In the event there is a conflict between the provisions of the Safety and Health Regulations for Construction promulgated by the U.S. Department of Labor in Title 29 CFR Part 1926, OSHA, or Cal OSHA, the more stringent provision shall prevail.

Installer will develop a site-specific OSHA approved Site Safety and Security Plan for each Project Site and submit it for review and approval prior to the start of construction. The Site Safety and Security Plan shall include an evaluation and appropriate documentation of the safety record for all subcontractors that will be performing work on the Project, a traffic control plan, and an Injury and Illness Prevention Program plan. The Site Safety and Security Plan shall also include the location of emergency utility shutoffs and an evacuation plan. No work shall be performed on the Project prior to written confirmation that the Site Safety and Security Plan has been accepted.

A safety conference shall be scheduled prior to the start of construction to review the experience modification rating, the respective safety requirements, and to discuss implementation of all health and safety provisions related to this project. Representatives from Installer and every subcontractor shall be present at the safety conference. Installer shall ensure the Site Host informed of the safety conference at least five days in advance and provided the option to attend.

Following the commencement of work on the Project, safety meetings will be held once a week with all Installer and subcontractors’ employees attending. Printed names will be taken of those attending the meeting. No individual will start work at any Project Site without having attended a safety briefing on the dangers and protocols of the Project Site. Records of this training will be kept and provided for Packet Page 831 of 1189Attachment 2 Page 79 of 159

27 review. No individual will operate a piece of equipment on which they have not had certification training. Certification shall be carried on the operator at all times.

Security of the Sites is the sole responsibility of Installer, including any security monitoring equipment, fencing or other precautions that Installer may deem reasonably necessary. The Site Host will not be liable for theft or damage of equipment or materials stored at the Sites.

Access to and Use of Project Sites
The Site Host shall provide access and area at each Site for the performance of the work on the Project, including lay-down area and storage area. The Site Host will grant Installer access to each Site to perform all work associated with the Project and on-going operation and maintenance during regular business hours, or such other reasonable hours requested by Installer and approved by The Site Host in accordance with the Agreement. Access points to the Sites must be closely coordinated with the Site Host and approved in advance before construction begins. The Site Host will issue the necessary keys to Installer to access Sites once all related requirements have been met. Installer shall return keys to the Site Host at any time upon request by the Site Host. Installer shall reimburse the Site Host for the cost of re-keying all of the Site Host’s locks if keys are not returned to the Site Host.

Installer agrees not to bring, keep, or permit to be brought to, or kept at or near any Site, any hazardous materials, or materials which are prohibited by the Site Host or prohibited by the standard form of Site Host’s insurance policy. Installer agrees not to commit or suffer to be committed any waste upon the Sites.

Installer shall install signage at each front gate or Site entrance to identify the Project and Installer’s name and contact information upon Site Host approval of all proposed signage. Installer shall submit a prototype of the construction signs to Site Host for review and approval before posting the signs at the construction sites. After approval, actual sign placement and location shall be coordinated with Site Host.

Drawings
Installer shall maintain one complete Engineering Design Package at each Site including one full set of full-size plans marked to show any deviations that have been made from the approved plans, including but not limited to buried or concealed construction features or utilities which are revealed during the course of construction. Current as-built record drawings shall be accessible to Site Host at all times during the construction period. They shall be reviewed with Site Host at regular intervals. Upon completion and prior to final inspection of the Project, Installer shall submit the complete as-built Engineering Design Package for review and shall make such revisions or corrections as may be necessary for them to be a true, complete, and accurate record of the Project in the opinion of Site Host.

Work-Time Constraints
Great care shall be taken to avoid interruptions to the Site Host activities and neighboring properties.

Construction activities shall take place between typical working hours of 7:00AM to 4:30PM, Monday through Friday, excluding recognized holidays. Reasonable efforts must be taken to minimize disturbance to persons living or working nearby, and to the general public. All local ordinances shall be adhered to regarding noise limits, otherwise a maximum of 65dB shall not be exceeded when measured at the property line. Deliveries shall take place outside high traffic times and must be coordinated with Site Host’s personnel. Preferred hours for deliveries are 8:00AM to 4:00PM, Monday Packet Page 832 of 1189Attachment 2 Page 80 of 159

28 through Thursday. Installer shall manage construction activities around and with consideration to the other projects occurring at the same time where applicable. Installer will be required to provide necessary weekly updates of scheduled activities at each Site to Site Host.

A shutdown plan must be provided to Site Host at least two months in advance to allow for electrical shutdowns to be carefully coordinated with Site Host’s personnel. All interruptions in power shall be subject to Site Host approval and must be coordinated to take place during a time period that will minimize disruptions to Site activities. This requirement will typically mean, and Site Host reserves the right to request, that shutdowns shall occur on weekends or after working hours. All efforts must be taken to minimize the amount of time required to complete interconnections. If required, backup power will be provided by Installer’s generators during shutdowns, at Installer’s expense. Notice of all pending shutdowns shall be provided thirty (30) days in advance, followed by two (2) weeks in advance, followed by forty-eight (48) hours in advance.

General Requirements

6.1.1 Conduit and Wiring
(a) Locations of all junction boxes shall be reviewed with the Site Host prior to start of construction. Junction boxes shall not be installed in or near playgrounds and playfields at any school sites.
(b) No trenching is allowed inside playgrounds and play fields at any school sites. (c) No wire splicing shall be allowed.
(d) All exposed wire shall be secured every three and a half feet (3.5’) minimum. (e) When terminating aluminum conductors, all terminations shall be brushed and coated with an oxide inhibitor.
(f) Underground cabling shall have electrical warning tape installed approximately twelve (12”) inches below finished grade in the backfill.
(g) Installer shall use GPRS and potholing to survey for underground utilities and use best practices when boring or trenching, including hand digging near buried lines.

Trenching or boring in potentially high-risk areas (gas lines) shall be coordinated with Site Host.
(h) Installer shall carefully preserve all benchmarks, monuments, survey markers, and stakes and shall be solely responsible for resetting if required. (i) Installer shall ensure parasitic loads (lights, security cameras, etc.) are not installed on the same circuit as the System’s Production Meter and are installed so that their load shall be included with the overall site’s Facility Load Meter measurement. (j) Installer shall confirm that each of the Systems is interconnected to the correct Distribution Utility meter at each Project Site by validating the meter and service account identification numbers (SAID) with the Distribution Utility. (k) All exposed wiring shall be properly rated for direct sun exposure. (l) Exposed wiring shall be restrained utilizing wire clips per NEC requirements and best practices to eliminate strain on Solar Facility module junction box connections, wire pinch points and wire kinks. Strain-relief devices shall be rated and labeled for exposure to UV (direct sunlight).
(m) Conduit entry locations shall be made in manufacturer provided/specified locations only.
(n) All ground conductors shall be protected from physical damage as specified in the NEC.
(o) Grounding wire connections must be made at closest point possible between concrete and steel, sharp edges removed, and painted to match.

Packet Page 833 of 1189Attachment 2 Page 81 of 159

29 (p) Power and data lines shall be located in separate conduits with appropriate separation to avoid interference.
(q) All junction boxes, condolets, etc., are to be sealed with a silicone sealing compound and made watertight.
(r) H-20 rated concrete handholes with cast iron or galvanized steel lids shall be used for all underground junction box locations unless Site Host approves an alternative approach. Lids shall be bolted or welded in place with an appropriate permanent marking such as “ELEC” or “COMM” on the lid depending on the contents of the junction box.
(s) Aboveground junction boxes must have tamperproof screws and shall not be placed in areas where water ponding is anticipated.

6.1.2 Equipment
(a) Equipment shall be stored and handled in accordance with manufacturer’s requirements.
(b) Inverters and battery enclosures, where applicable, shall be placed away from all buildings where the operational noise would disturb the occupants. (c) Inverters and battery enclosures, where applicable, shall not be placed in locations where fences or other barriers would obstruct replaceable air filters or prevent access for regular service and cleaning.
(d) All high voltage and high amperage equipment must be installed in secure, tamper- proof, and locked enclosures to prevent unauthorized tampering for safety and theft prevention.
(e) Locks for all gates and enclosures to be provided by Installer but must be approved by Site Host prior to procurement.
(f) Where necessitated by birds nesting underneath solar shade structures and/or ground mounted racking systems, Installer shall be responsible for providing a means of deterring birds from nesting that is acceptable to Site Host. (g) Safety labels are required for high voltage and high amperage equipment. (h) All enclosures shall be detailed as part of the punch list work to ensure that any scratches, etc. are properly covered with paint as appropriate. (i) Solar PV panels shall have their serial numbers recorded as they are installed, grouped and listed by DC string.
(j) The Project will include installation of conduits at each Site sufficient to allow for future installation of security cameras at locations agreed upon with Site Host during Project design. Should Installer choose to install cameras as part of the overall security plan for any Site, camera selection and location shall be coordinated Site Host.

Integration of any installed safety and security systems with the SCADA system shall be reviewed with Site Host and options provided.

6.1.3 Site Work
(a) It is Installer’s soleresponsibility to ensure that all work on the Project complies with all federal, state, and local code requirements, all applicable industry codes and standards, and all other requirements in the Agreement including the requirements in this General Conditions and Technical Specifications.
(b) Temporary security fencing around construction areas shall be provided throughout construction, to be removed at end of construction, and permanent fencing and bollards added as required.
(c) Prior to the start of any work on Site, Installer shall take pre-construction videos and photographs of any and all areas that may be impacted as part of the Project Packet Page 834 of 1189Attachment 2 Page 82 of 159

30 construction and shall provide the pre-construction videos and photographs to Site Host for review and reference.
(d) Following the finish of construction, Installer shall take post-construction videos and photographs of all areas that were impacted as part of the Project construction and shall provide the post-construction videos and photographs to Site Host for review and reference.
(e) Installer is solely responsible for locating and avoiding all existing underground utilities, including irrigation lines, and shall ensure the existing underground utilities and installations are not impacted by Project construction. In the event Installer damages or makes inoperable any underground or above ground utilities, it will be Installer’s full responsibility to notify Site Host immediately and make damaged/inoperable utilities whole and fully operational to Site Host’s standards and to Site Host’s satisfaction, at Installer’s sole cost and expense. (f) Installer is responsible for the repair of any damage to any Site that is caused by Installer at their sole cost and expense. Installer shall assess the condition of all areas to be used in the construction of the Systems prior to construction and shall alert Site Host if any such area cannot accommodate wear and tear caused by ordinary construction activities. In such event, Installer shall propose a reasonable remedy or remedies to such conditions for Site Host’s consideration. (g) Damage to Site Host’s facilities and/or the Systems shall be reported to Site Host within twenty-four (24) hours with photographs.
(h) All parking lot wheel stops that are damaged during construction shall be replaced at Installer’s sole expense.
(i) All areas within the limits of construction or otherwise impacted by construction of the Project shall be restored to pre-Project conditions at Installer’s sole cost and expense including but not limited to existing rooftop equipment, fine grading, rock and concrete spoils removal and vegetation remediation.
(j) For roof mounted Solar Facilities, no metal cutting shall occur on the roof, with the exception of conduit, which shall be cut over a carpet or similar filing collector and taken off the roof in whole at the end of the Project. In no instance shall metal filings blow or otherwise end up on the surface of any Solar Facility module or the roof. (k) For roof mounted Solar Facilities, the roof shall be loaded in a manner prescribed by the structural engineer so as not to overload any particular point on the roof during construction.
(l) Installer will coordinate with Site Host when boring or trenching is performed, when laydown areas are determined, when major shipments are planned, or any other activities that might impact Site Host’s operations.
(m) Installer shall correctly torque all such equipment or assemblies requiring torque and mark torqued bolts to designate status of having been torqued. Site Host or Site Host’s representative may at any time request a test of marked bolts. Failure of a bolt designated as torqued to show that torque may require all assemblies to be re-torqued in the presence of a third-party inspector – such inspector to be paid for by Installer. (n) Installer shall maintain a clean and workmanlike construction site. Loose debris and unsafe conditions shall not be tolerated at any time.
(o) Installer is responsible to obtain all necessary Site data, perform all required investigations and reasonably determine all Site data required for the design and construction of the Systems at their sole cost.
(p) Installer shall be responsible for the removal and disposal of all excess soil and construction related debris generated by Installer or subcontractors in accordance with applicable law.

Packet Page 835 of 1189Attachment 2 Page 83 of 159

31 (q) Appropriate safety signs are required to caution drivers for speed or path restrictions near equipment pads.
(r) Signage shall be provided at all drive aisle locations that coincide with a Solar Facility shade structure clearly indicating the clearance height of all shade structures. (s) Safety bollards or traffic pylons with reflective strips shall be installed where any part of the Project is adjacent to a road.
(t) Safety bollards or traffic pylons with reflective strips shall be installed at the corners of ground mounted Solar Facility and around all electrical equipment pads. (u) Signs and barricades shall be provided and maintained by Installer and shall be in accordance with jurisdictional regulations for accident prevention and in accordance with the Site Safety and Security Plan.
(v) Installer shall ensure to reasonable extent and availability of installation space that solar structures are built away from the line of sight of neighboring properties, where applicable.
(w) Where applicable, installer shall identify and remove trees that would cause shading and reduce production of Solar Facility or are in direct path of construction. Installer shall mark each tree and review with Site Host and Arborist prior to removal. Installer shall remove the tree stump, grind to twelve inches (12”) below grade and provide a surface flush with surrounding grounds using the same material as the surrounding area.
(x) Where applicable, installer shall remove light posts (including complete concrete bollards and rebar cages above and below grade) and other non-building fixtures that would cause shading and reduce production of Solar Facility. Where light post removal is required, Installer shall mark each light post and fixture and review with Site Host prior to removal. After removal of the light post, Installer shall electrically secure the termination point at ground level in an H-20 rated concrete handhole with cast iron or galvanized steel lid. Lids shall be bolted or welded in place with a permanent marking such as “ELEC” or “LIGHTING” on the lid. Installer shall use best efforts to remove the light posts and deliver to Site Host at the Project Site in existing condition so Site Host can re-install in other areas.
(y) Installer shall verify all required clearances in the field prior to construction and is solely responsible therefor.
(z) Driveways in parking lots must stay open during construction. Any parking lot driveway closure must be temporary (i.e., a few hours for heavy material delivery) and shall be coordinated with Site Host.
(aa) Installer is responsible for providing drinking water and sanitation facilities for all workers.
(bb) Where applicable, temporary power for construction shall be arranged and paid for by Installer.
(cc) Installer must apply for fire hydrant meter permit and cover all expenses for construction water use where applicable.
(dd) For water district sites, Site Host has the option to supply a fire hydrant meter providing recycled water for use by Installer for construction water use where applicable.

Installer shall be responsible to provide means of pumping, piping, transport, etc. for such water from Site Host supplied fire hydrant meter to the construction area. (ee) All cut edges of galvanized strut or other support structure materials shall be cold galvanized.
(ff) Saw cut concrete shall be replaced joint to joint and match nearby area. (gg) Installer shall backfill all trenches with engineered fill and compact to 95 percent minimum.

Packet Page 836 of 1189Attachment 2 Page 84 of 159

32 (hh) All asphalt cuts shall be made in square or rectangular cuts to avoid inconsistent repair work. Installer shall cover asphalt trenches with hot mix asphalt, roll for compaction, and cover the width of the trench with a slurry seal after the cure period. All repairs shall be made to match existing. Any repainting of striping required to return the site to original or better conditions shall be the sole responsibility of Installer. (ii) Installer shall reseed or provide sod for all areas where existing grass was damaged. (jj) Installer shall conduct harmonic testing and install necessary line filters if Site Host or the Distribution Utility detects electromagnetic interference (EMI) following the installation of the Systems. Detection of EMI includes noticeable power interruptions in previously functional electrical equipment.

7. FINAL PROJECT CLOSEOUT
Closeout Activities
Prior to completion of work at any Site, Installer will perform the following tasks:

• Complete all unfinished work described on a punch list approved by Site Host in a timely manner.
• Complete final clean-up of each Site, which shall include a thorough washing of the solar PV panels for Solar Facilities. All solar PV panel washing shall be completed in accordance with the manufacturer’s recommendations.
• Confirm minimum 30-day continuous operation for the entire system, all sub-systems, and ancillary equipment without downtime following the final commissioning for projects. • Assemble and provide Site Host with the Final Binder containing all documents outlined below and all other required submittals.
• Provide training for Site Host personnel on emergency shut-down procedures as well as standard inverter restart procedures.
• Demonstrate the successful operation of the Microgrid while disconnected from the Distribution Utility grid where applicable.

Final Binder
A complete set of Project documentation in digital format, unless otherwise noted below, shall be provided to Site Host at the finish of construction for record keeping purposes (the “Final Binder”).

The Project documentation shall include, at a minimum, the following documents:
• Copy of executed Agreement(s) and all amendments
• Copy of the Notice to Proceed to design
• Copy of the Notice to Proceed to construction
• Copies of all reports and studies completed, including but not limited to:
o Underground Utility Surveys
o Title Reports / ALTA Surveys
o Geotechnical Studies
o Environmental Studies
o Bore logs including GPS location coordinates and depth dimensions for all Project underground utilities
o Glint and Glare study
o Arc Flash / Coordination Study
• Final design drawings as approved by any Governmental Authorities having jurisdiction over the Project in PDF and AutoCAD
Packet Page 837 of 1189Attachment 2 Page 85 of 159

33 • Copy of all Governmental Approvals required for the Project to be constructed • Copy of all Governmental Approvals required for the Project to be operational • Letter to the Distribution Utility requesting final inspection in advance of Permission to Operate
• Completed Commissioning Report - Attachment D
• Permission to Operate notice from the Distribution Utility • All incentive related documents
• All final executed Distribution Utility agreement(s) – interconnection, special facilities, etc. • As-built drawings in PDF and AutoCAD
• Equipment data sheets, installation & user manuals, and warranties for all Major Equipment including but not limited to Solar Facility modules, Solar Facility module mounting systems, inverters, batteries, transformers, controllers and monitoring systems • Final System Site Assessment Table in PDF and MS Excel formats • Where applicable, final Battery System performance modeling report in 4x8760 output file in MS Excel format
• Where applicable, final Solar Facility PVsyst modeling in PDF and 8760 MS Excel format • Where applicable, final system performance report detailing the Critical Loads and Estimated Microgrid Operation Duration
• Final punch list showing proof of completion of all items • Letter stating Commercial Operation Date achievement and date • Contact Information for all key Installer personnel including:
o Installer’s name
o Installer’s main office mailing address, phone, fax, and email o Employer Identification Number (“EIN”)
o Installer’s main contact person’s name, job title, mailing address, phone number, fax number, and email
o Operations and Maintenance contact person’s name, job title, mailing address, phone number, fax number, and email
• Two (2) sets of keys to all locks, equipment, enclosures, fence gates and boxes • Operations and Maintenance manual
• Site Host training completion date, including list of personnel trained in inverter shutdown and restart procedure
• Monitoring system information including:
o Monitoring system hardware and internet portal specification sheets o Meter calibration records with serial numbers for all meters o Website access and operation instructions
o List of public monitoring websites
o IP addresses and login information of the data logger o Network configuration documentation
o PMRS installer contracts
• Site photographs of all items listed below (electronic version only):
o Solar Facility arrays, where applicable
o Batteries, where applicable
o Inverters
o Combiner boxes
o Transformers
o Disconnects
o Panelboards/switchgear
o Motorized circuit breakers, where applicable
Packet Page 838 of 1189Attachment 2 Page 86 of 159

34 o Electrical point of connection to existing distribution equipment o Distribution Utility meter
o Battery System Meter, Facility Load Meter, Critical Load Meter, Solar Production Meter and any other meters, where applicable
o Battery System controller, where applicable
o Microgrid controller, where applicable
o Monitoring equipment including weather sensors where applicable

8. OPERATIONS AND MAINTENANCE
Installer shall be responsible for all operations and maintenance of the Systems if included in the Agreement. The operations and maintenance shall include at a minimum:

A. All preventative maintenance required to maintain all equipment warranties.

B. Installer shall provide erosion control, weed abatement, and security for the Site throughout the Term at their sole expense.

C. Ground mounted arrays shall include the application at the completion of construction and as required through the Term of the Agreement of a dust control polymer additive coating within the Solar Facility area to limit solar PV panel soiling.

D. Installer shall maintain one complete Engineering Design Package throughout the Term of the Agreement and update with any changes made from the as-built drawings provided at the completion of construction.

E. A minimum of one annual solar PV panel washing shall be required at all sites if operations and maintenance is included in the Agreement. The timing of the washing(s) shall be coordinated with Site Host to ensure beneficial production impact.

F. Where painted steel is used for the structural components of the array, Site Host shall be provided with a hex color code and an adequate amount of touch up paint to address minor aesthetic maintenance.

Packet Page 839 of 1189Attachment 2 Page 87 of 159

35 ATTACHMENT A - PRELIMINARY ENGINEERING DESIGN PACKAGE

TO GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Packet Page 840 of 1189Attachment 2 Page 88 of 159

STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\GI001 COVER SHEET.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

COVER SHEET
GI001

CITY OF FAIRFIELD
Solar Electric System Scope:

The following design describes a solar PV system with an STC DC rating size of 1785.0 kW, and an AC rating of 1250 kW.

The installation consists of (3000) QCells, 595W Photovoltaic Modules with an 180° azimuth. The modules are tilted 20° and use a fixed-tilt ground mounted racking system.
(5) Chint SCH275KLT-DO/US-800-36 250W AC output, UL1741 listed, grid tied inverters will receive the power from the photovoltaic array and a utility AC disconnect will isolate the system from the utility grid.

A Battery Energy Storage System will be utilized for the project consisting of (2) Socomec SUNSYS HES L with one sized
250kW/930kWh and the other 200kW/930kWh.

The system will be interconnected to the existing electrical service at 480VAC and will be operated in parallel with the local energy provider's electric grid per the requirements of the CEC.

VICINITY MAP STREET MAP SITE MAP

DESIGN CRITERIA PROJECT SCOPE PROJECT TEAM DRAWING INDEX

PROJECT
AREA

CODE/STANDARD EDITION ARTICLE/DESCRIPTION
California Building Code 2022
California Electrical Code 2022 CEC Article 690, Solar Photovoltaic Systems and 705 Interconnected Electric Power Production Sources
Underwriter's Laboratory 1703 2002 Standard for Flat-Plate Photovoltaic Modules and Panels
Underwriter's Laboratory 1741 2010
Standard for Inverters, Converters, Controllers and
Interconnection System Equipment for Use With
Distributed Energy Resources
Institute of Electrical and Electronics
Engineers 1547 2013 Standard for Interconnecting Distributed Resources with Electric Power Systems
National Fire Protection Agency 70E 2015 Standard for Electrical Safety in the Workplace Occupational Safety and Health
Administration 29CFR, 1926 2011 Construction Industry Safety Regulations SOLAR CONSTRUCTION FIRM:

Holt Renewables, LLC.
1301 Capital of TX Hwy S #B315
Austin, Texas 78746
512-382-2999
Project Managers:

Casey Lilley - [email protected]
Designers:

Samuel Sherman -
[email protected]
SITE CONTACT:

City of Fairfield
Waterman Treatment Plant
2900 Vista Grande Circle
Fairfield, CA 94534
Main Office: 707-428-7485
Site Contact:

TBD
ENGINEERING FIRM:

KMB Design Group
1800 NJ-34
Wall Township, NJ 00719
855-755-6234
Engineer of Record:

Allison Kimball, P.E.
[email protected]
732-894-5061
CA License: E53325
Sheet Number Sheet Title
GI001 COVER SHEET
GI002 SYMBOLS AND ABBREVIATIONS
GI003 GENERAL NOTES
WI101.1 SITE PLAN
WI101.2 SITE PLAN - ARRAY
WI101.3 SITE PLAN - POI
WP601.1 ELECTRICAL SLD - PV
WP601.2 ELECTRICAL SLD - BESS
WP601.3 ELECTRICAL SLD - POI
WK801 DATA SHEETS
WK802 DATA SHEETS
SOLAR ELECTRIC SYSTEM - 1785.0 kW DC RATING

WATERMAN TREATMENT PLANT

PROJECT
AREA
ARRAY
AREA

INTERCONNECTION
Packet Page 841 of 1189Attachment 2 Page 89 of 159

G

SECTION

ELEVATION
DETAIL
DETAIL
(ENLARGED PLAN)
TAG

KEYED NOTES

REVISIONS

GROUND TERMINAL

GROUNDING

POINT/ROD

SOLAR PANEL
MODULE STRINGING XX:XX-XX
GFDI
AC
DC
XX

LOCATION IN STRING
STRING I.D. NUMBER

SOURCE CIRCUIT

BLADE DISCONNECT

FUSED DISCONNECT

OVERCURRENT

BREAKER

DC TO AC INVERTER
METER

PULL BOX

COMMUNICATIONS

PULL BOX

COMBINER BOX

DC COMBINER BOX

DC COMBINER

DISCONNECT

INVERTER

CURRENT RATING

FUSE RATING

BREAKER RATING
15A
15A
15A
PB.01
CB.01
DCB.01
DCD.01
INV.01
NUMBER
NUMBER
NUMBER
NUMBER
NUMBER
DETAIL I.D. LETTER

SHEET LOCATION
DETAIL I.D. LETTER

SHEET LOCATION
DETAIL I.D. LETTER

SHEET LOCATION
DETAIL I.D. LETTER

AREA TO BE ENLARGED

SHEET LOCATION
SAME SHEET I.D. LETTER

ADDENDUM NUMBER

REVISED AREA CLOUDED
1 1
101
1 101
1 1
101
1 101
1 PBC.01 NUMBER
0 1P SINGLE POLE
1PH SINGLE-PHASE
3/C THREE-CONDUCTOR
3P THREE POLE
3PH THREE-PHASE
3W THREE-WIRE
4W FOUR-WIRE
A

A AMPERE

A/C UNIT AIR CONDITIONING UNIT

AC ALTERNATING CURRENT

ACD AC DISCONNECT

ACP AC PANELBOARD

ADDL ADDITIONAL

ADDM ADDENDUM

AFCI ARC FAULT CIRCUIT-INTERRUPTION

AFG ABOVE FINISHED GRADE

AH AMPERE HOUR

AHJ AUTHORITY HAVING JURISDICTION

AL ALUMINUM

AMP AMPERE

AMT AMOUNT

APPROX APPROXIMATE

AR AS REQUIRED

ART ARTICLE

AWG AMERICAN WIRE GAUGE

ASSY ASSEMBLY

AUTO AUTOMATIC

AUX AUXILIARY

AVG AVERAGE

AZ AZIMUTH
B

BESS BATTERY ENERGY STORAGE SYSTEM

BFBRKR BACKFED BREAKER

BLDG BUILDING

BNDG BONDING

BOT BOTTOM

BRKR BREAKER

BTWN BETWEEN
C

C CELSIUS

CB COMBINER BOX

CEC CALIFORNIA ELECTRICAL CODE

CENC CALIFORNIA ENERGY COMMISSION

CJ CONTROL JOINT

CKT BRKR CIRCUIT BREAKER

CL CENTER LINE

CMU CONCRETE MASONRY UNIT

CND CONDUIT

COMM COMMUNICATIONS

CONC CONCRETE

CONT CONTINUE

CT CURRENT TRANSFORMER

CTR CENTER

CU COPPER
D

DBL DOUBLE

DC DIRECT CURRENT

DCB DC COMBINER BOX

DCD DC COMBINER DISCONNECT

DET DETAIL

DIA DIAMETER

DIAG DIAGRAM

DIM DIMENSION

DISC DISCONNECT

DS DISCONNECT SWITCH

DWG DRAWING
E

EA EACH

EL ELEVATION

EJ EXPANSION JOINT

ELEC ELECTRIC

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

ENT ELECTRICAL NONMETALLIC TUBING

EPB ELECTRICAL PANEL BOARD

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

EST ESTIMATE

EXST EXISTING

EXST GR EXISTING GRADE

EXT EXTERIOR
F

F FAHRENHEIT

FF FINISH FLOOR

FIN GR FINISH GRADE

FLR FLOOR

FS FULL SCALE

FT FOOT, FEET

FU SW FUSED SWITCH
G

GALV GALVANIZED

GC GENERAL CONTRACTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GL GROUND LEVEL

GUT GUTTER
H

HAZ MAT HAZARDOUS MATERIALS

HDPE HIGH DENSITY POLYETHYLENE

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HWY HIGHWAY
Hz HERTZ
I

ID IDENTIFICATION

IMC INTERMEDIATE METAL CONDUIT

INCL INCLUDED

INFO INFORMATION

INSTL INSTALL

INT INTERIOR

INV INVERTER
J

J JUNCTION BOX
K
kW KILOWATT
kWh KILOWATT HOUR
L

LA LIGHTNING ARRESTER

LAT LATITUDE

LP LIGHT POLE

LTD LIMITED

LTNG LIGHTNING
M

M METER

MATL MATERIAL

MAX MAXIMUM

MC METAL-CLAD

MCB MAIN CIRCUIT BREAKER

MECH MECHANICAL

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MNCB MAIN COMBINER BOX

MOCP MAXIMUM OVERCURRENT PROTECTION

MTL METAL

MTLR METAL ROOF

MV MEDIUM VOLTAGE

MW MEGAWATT
MWh MEGAWATT HOUR
N

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEUT NEUTRAL

NFSD NONFUSED

NGOM NET GENERATION OUTPUT METER

NIC NOT IN CONTRACT

NOCT NOMINAL OPERATING CELL TEMPERATURE

NTS NOT TO SCALE
O

OAE OR APPROVED EQUAL

OC ON CENTER

OCPD OVER CURRENT PROTECTION DEVICE

OD OUTSIDE DIAMETER, DIMENSION

OH OVERHEAD

OPP OPPOSITE

OPT OPTIONAL

OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION

OVC OVERCURRENT
P
P POLE

PAR PARAPET

PB PULL BOX

PERIM PERIMETER

PH PHASE

PKG PACKAGE

PM PHASE METER

PNL PANEL

POCC POINT OF COMMON COUPLING

POI POINT OF INTERCONNECTION

PRELIM PRELIMINARY

PTC PV FOR UTILITY SCALE APPLICATIONS TEST CONDITIONS

PV PHOTOVOLTAIC

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER
Q

QLTY QUALITY

QTY QUANTITY
R

RD ROOF DRAIN

REINF REINFORCE

REV REVISION

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH ROOF HATCH

RST REINFORCING STEEL

RMC RIGID METAL CONDUIT

RTU ROOF TOP UNIT
S

SCHED SCHEDULE

SF SQUARE FOOT/FEET

SIM SIMILAR

SKLT SKYLIGHT

SKLT SKYLIGHT

SS STANDING SEAM ROOF

SST STAINLESS STEEL

STC STANDARD TEST CONDITIONS

STD STANDARD

SW SWITCH

SWBD SWITCHBOARD

SYM SYMBOL
T

TBD TO BE DETERMINED

TEMP TEMPERATURE

TMP TEMPORARY

THWN MOISTURE AND HEAT RESISTANT THERMOPLASTIC

THRU THROUGH

TOP TOP OF PARAPET

TYP TYPICAL
U

UG UNDERGROUND

UGPB UNDERGROUND PULL BOX

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

UP UTILITY POLE

UTIL UTILITY
V

V VOLTAGE

VAC VOLTS ALTERNATING CURRENT

VDC VOLTS DIRECT CURRENT

VD VOLTAGE DROP

VIF VERIFY IN FIELD

VOLT VOLTAGE

VRFY VERIFY

VS VENT STACK
W
W/WITH

W/O WITHOUT
W WATT
X

XFMR TRANSFORMER

XHHW MOISTURE RESISTANT THERMOSET

XLPE CROSS-LINKED POLYETHYLENE
STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\GI002 SYMBOLS AND ABBREVIATIONS.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

SYMBOLS AND

ABBREVIATIONS
GI002
SYMBOLS: ABBREVIATIONS:

Packet Page 842 of 1189Attachment 2 Page 90 of 159

STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\GI003 GENERAL NOTES.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

GENERAL NOTES
GI003
GENERAL NOTES:

PROCEDURAL NOTES:

P1.PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL NOTIFY

HOLT OF ANY DISCREPANCIES DISCOVERED BETWEEN THESE PLANS AND THE SITE CONDITIONS; SUCH AS DIMENSIONS, EXISTING CONDITIONS, STRUCTURE,

ELECTRICAL RUNS (SPECIFY EXISTING ITEMS), WALLS, PARAPETS, FLASHING,

MANUFACTURER RECOMMENDATIONS OR CODES, REGULATIONS OR RULES OF AHJ.

P2. ALL DIMENSIONS OR EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO COMMENCING WORK.

P3. THE CONTRACTOR IS RESPONSIBLE FOR ALL BRACING AND SHORING OF EQUIPMENT DURING INSTALLATION.

P4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS, OSHA REQUIREMENTS AND SAFETY MEASURES ON SITE. THE ENGINEER HAS NO

OVERALL SUPERVISORY AUTHORITY AND NO DIRECT RESPONSIBILITY FOR THE SPECIFIC WORKING CONDITIONS OR FOR POSSIBLE EXISTING HAZARDS.

P5. CONTRACTOR QUESTIONS SHALL BE SUBMITTED TO HOLT PRIOR TO MAKING ANY CHANGES. HOLT WILL PROVIDE RFI'S TO ENGINEER AND RFI RESPONSES TO CONTRACTOR AS REQUIRED. ALL DOCUMENT CONTROL WILL BE ADMINISTERED BY HOLT .

GENERAL NOTES:

G1. ALL WORK SHALL BE PERFORMED IN A SAFE, EFFICIENT, AND WORKMAN LIKE MANNER.

G2.THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EQUIPMENT

AND FOLLOWING ALL MANUFACTURER'S OR ENGINEER'S DIRECTIONS AND INSTRUCTIONS SHOWN HERE.

G3.THE ELECTRICAL CONTRACTOR IS ADVISED THAT ALL DRAWINGS, COMPONENT

MANUALS, ESPECIALLY THE INVERTER MANUALS, ARE TO BE READ AND UNDERSTOOD PRIOR TO INSTALLATION OR ENERGIZING OF ANY EQUIPMENT. THE

CONTRACTOR IS ALSO ADVISED TO HAVE ALL COMPONENT SWITCHES IN THE OFF (OPEN) POSITION AND FUSES REMOVED PRIOR TO INSTALLATION OF FUSE-BEARING COMPONENTS.

G4. INSTALLATION CREW IS TO HAVE A MINIMUM OF ONE JOURNEYMAN LEVEL

ELECTRICIAN PER THREE APPRENTICE'S ON SITE AT ALL TIMES WHEN ELECTRICAL WORK IS BEING PERFORMED.

G5.CONTRACTOR SHALL HAVE A NABCEP-CERTIFIED INSTALLER DIRECTLY SUPERVISE ALL PV SYSTEM INSTALLATION WORK.

G6. FOR SAFETY IT IS RECOMMENDED THE INSTALLATION CREW ALWAYS HAVE A MINIMUM OF TWO PEOPLE WORKING TOGETHER.

G7.THIS SOLAR PHOTOVOLTAIC SYSTEM SHALL BE INSTALLED FOLLOWING THE CONVENTIONS OF THE CEC. ANY LOCAL CODE WHICH MAY SUPERSEDE THE CEC SHALL GOVERN.

G8.ALL COMPONENTS TO BE INSTALLED WITH THIS SYSTEM ARE TO BE LISTED BY A THIRD PARTY TESTING AGENCY (UL, ETL, ETC.). EQUIPMENT SHALL BE NEMA 3R OUTDOOR RATED OR BETTER, UNLESS LOCATED INDOORS.

G9.THE ENGINEER SPECIFIES THE MINIMUM REQUIRED EQUIPMENT AND

SPECIFICATIONS TO ACCOMPLISH THE PROJECT AND THE ELECTRICAL

CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THESE SPECIFICATIONS ARE MET OR EXCEEDED WITH GOOD QUALITY EQUIPMENT, WORKMANSHIP AND SKILL.

G10.DC VOLTAGE FROM THE ARRAY IS ALWAYS PRESENT AT THE DC DISCONNECT

ENCLOSURE AND THE DC TERMINALS OF THE INVERTER DURING DAYLIGHT HOURS. ALL PERSONS WORKING ON OR INVOLVED WITH THIS PHOTOVOLTAIC

SYSTEM MUST BE WARNED THAT SOLAR MODULES ARE ENERGIZED WHEN EXPOSED TO DAYLIGHT. THE LINE AND LOAD TERMINALS ON THE DC

DISCONNECTS MAY BE ENERGIZED IN THE OPEN POSITION AND THE SWITCH IS TO BE LABELED TO COMPLY WITH ARTICLE 690.17 OF THE CEC.

G11. ALL PORTIONS OF THIS SOLAR ELECTRIC SYSTEM SHALL BE CLEARLY MARKED IN ACCORDANCE WITH CEC ARTICLE 690.

G12. FOR PROPER MAINTENANCE AND ISOLATION OF INVERTERS, REFER TO ISOLATION PROCEDURE IN INVERTER OPERATION MANUAL. CONTRACTOR PERFORMING THE MAINTENANCE IS RESPONSIBLE TO FOLLOW ALL LOCKOUT/TAGOUT PROCEDURES.

G13. THIS PHOTOVOLTAIC SYSTEM'S UTILITY INTERCONNECTION POINT SHALL MEET THE SPECIFIC REQUIREMENTS OF CEC ARTICLE 705.12. FOLLOW THE SPECIFIC INSTRUCTIONS IN THIS DRAWING SET TO MEET THIS CODE REQUIREMENT.

G14. THE GROUNDING OF THE PHOTOVOLTAIC SYSTEM SHALL COMPLY WITH CEC 690.45 AND CEC 690.47. IF THE REQUIREMENTS DESCRIBED IN THIS DRAWING SET ARE CLOSELY FOLLOWED, THE GROUNDING REQUIREMENT SHALL BE MET. ANY

CHANGES SHALL BE REVIEWED AND DEEMED ACCEPTABLE BY THE ENGINEER, MANUFACTURER AND LISTING AGENCY FOR PRODUCT SAFETY.

G15. ELECTRICAL CONTRACTOR SHALL COORDINATE EQUIPMENT ACCEPTANCE TESTING AND COMMISSIONING WITH HOLT .

G16. THE CONTRACTOR IS RESPONSIBLE FOR MOUNTING ALL EQUIPMENT PER THE ENGINEER'S REPORT OR MANUFACTURER'S SPECIFICATIONS. IF SPECIFICATIONS

ARE NOT APPARENT, THE CONTRACTOR SHALL USE DILIGENT EFFORTS TO

MOUNT EQUIPMENT SUCH THAT IT WILL BE CLEAN, LEVEL AND SOLID IN ORDER TO LAST THE LIFETIME OF THIS SOLAR ELECTRIC SYSTEM.

G17. ANY METAL SHAVINGS RESULTING FROM SITE WORK SHALL BE CLEANED FROM

ENCLOSURE INTERIORS, TOP SURFACES OF ENCLOSURES, THE GROUND

SURFACE, ROOFS AND ANY ADDITIONAL AREAS WHERE OXIDIZED OR

CONDUCTIVE METAL SHAVINGS MAY CAUSE RUST, ELECTRICAL SHORT CIRCUITS OR OTHER DAMAGE.

G18. THE ELECTRICAL CONTRACTOR SHALL CONSIDER THE WEATHERING OF

EQUIPMENT OVER TIME AND ELIMINATE THE POSSIBILITY OF DEGRADATION OF EQUIPMENT DUE TO WATER ENTRY AND UV EXPOSURE. AS A RESULT, HOLT

REQUIRES THE USE OF UNISTRUT OR SIMILAR MOUNTING SYSTEMS TO MOUNT

ENCLOSURES, PULL BOXES, LOAD CENTERS, FUSE BOXES OR OTHER EQUIPMENT TO ROOFTOPS AND WALLS TO PREVENT WATER BUILD-UP. WEEP HOLES SHALL

NOT BE PROVIDED IN ENCLOSURES THAT WOULD CAUSE A REDUCTION IN THE ENCLOSURES' NEMA RATING. SEALING CONDUIT WITH A FIRE RETARDANT FOAM

OR CAULK AT ENCLOSURE ENTRY POINTS IS RECOMMENDED TO MINIMIZE CONDENSATION AND PESTS IN ENCLOSURES. FOR CONDUIT LOCATIONS RUNNING

THROUGH WALLS FIRE RETARDANT FOAM OR CAULK MUST BE USED TO MAINTAIN THE CURRENT FIRE RATING OF THE WALL AND MUST COMPLY WITH UL 1479 & UL 723 STANDARDS FOR THROUGH PENETRATIONS.

G19. ALL MATERIAL SHALL BE NEW AND RATED FOR UV EXPOSURE WHERE EXPOSED TO SUNLIGHT.

G20. CONSTRUCTION STAGING OF CONCENTRATED LOADS ON ROOF SHALL BE MINIMIZED. SPECIAL ATTENTION SHALL BE PAID TO ROOF LOADING DURING

INSTALLATION SUCH THAT HEAVY ITEMS ARE NOT LOADED IN A MANNER THAT WOULD OVERLOAD THE ROOF.

G21. CONTRACTOR SHALL COORDINATE SOLAR ARRAY INSTALLATION WORK WHERE MINIMAL DAMAGE OCCURS TO LANDSCAPE. CONTRACTOR SHALL RESTORE ALL DAMAGED LANDSCAPE TO ORIGINAL CONDITION.

G22. CONTRACTOR SHALL RESTORE INTERIOR/EXTERIOR FINISHES TO ORIGINAL OR BETTER CONDITION.

G23.EXISTING TREES REMOVED AS PART OF CONSTRUCTION SHALL HAVE THEIR STUMPS GROUND TO 12" BELOW GRADE AND COVERED WITH NATIVE TOPSOIL.

TOPSOIL SHALL BE FILLED AND COMPACTED TO MATCH EXISTING GRADE.

G24. PROVIDE AND INSTALL GROUNDING TYPE BUSHING WITH GND WIRE TO ENCLOSURE ON ALL CONCENTRIC OR ECCENTRIC KNOCKOUTS.

ELECTRICAL NOTES:

E1. IN EVERY PULL BOX, TERMINAL BOX, AND AT ALL PLACES WHERE CONDUCTORS

MAY NOT BE READILY IDENTIFIED BY NAMEPLATE MARKINGS ON THE EQUIPMENT

TO WHICH THEY CONNECT, IDENTIFY EACH CIRCUIT WITH A PLASTIC LABEL OR TAG FOR NUMBER, POLARITY OR PHASE.

E2. THE LAYOUT OF CONDUIT SHOWN IN THESE PLANS IS INDICATIVE ONLY.

CONTRACTOR SHALL ROUTE AND LOCATE THE CONDUITS TO SUIT SITE

CONDITIONS BUT SHALL NOT EXCEED THE MAXIMUM CONDUCTOR LENGTHS IDENTIFIED ON THE CONDUCTOR SCHEDULE. CONTRACTOR SHALL COORDINATE ALL CHANGES IN CONDUCTOR AND CONDUIT WITH THE ENGINEER VIA AN RFI.

E3. WHERE CONDUCTOR AND CABLE ROUTING IS NOT SHOWN, AND DESTINATION

ONLY IS INDICATED, CONTRACTOR SHALL DETERMINE EXACT ROUTING AND LENGTHS REQUIRED. A SHOP DRAWING OF PROPOSED INSTALLATION SHALL BE SUPPLIED PRIOR TO INSTALLATION.

E4. BENDS SHALL NOT DAMAGE THE RACEWAY OR SIGNIFICANTLY CHANGE THE INTERNAL DIAMETER OF RACEWAYS (NO KINKS).

E5.SUPPORT CONDUCTORS IN VERTICAL CONDUITS IN ACCORDANCE WITH REQUIREMENTS IN CEC 300.19.

E6. INSTALL ALL CONDUCTOR MATERIALS IN A NEAT WORKMANLIKE MANNER. USE GOOD TRADE PRACTICES AS REQUIRED BY CHAPTER 3 OF THE CEC.

E7. INSTALL CONDUIT TO MAINTAIN PROPER CLEARANCES AND IN A NEAT INCONSPICUOUS MANNER. RUN PARALLEL AND AT RIGHT ANGLES TO STRUCTURAL MEMBERS OR OTHER CONDUITS. PROVIDE BOXES, FITTINGS AND BENDS FOR CHANGES IN DIRECTION. FASTEN CONDUIT SECURELY IN PLACE.

E8. SUPPORT CONDUIT USING STEEL PIPE STRAPS (OAE), LAY-IN ADJUSTABLE HANGERS, CLEVIS HANGERS OR SPLIT-HANGERS. HANGER SPACING SHALL BE

INSTALLED PER CEC REQUIREMENTS FOR THE TYPE OF CONDUIT BEING INSTALLED. USE APPROVED BEAM CLAMPS FOR CONNECTION TO STRUCTURAL MEMBERS.

E9.PROVIDE PULL, JUNCTION, OR CHRISTY BOXES WHERE REQUIRED TO FACILITATE

THE INSTALLATION OF CONDUCTOR IN ADDITION TO THOSE SHOWN ON THE DRAWINGS. BENDS IN CONDUITS BETWEEN PULL BOXES SHALL NOT EXCEED THE EQUIVALENT OF FOUR 90 DEGREE BENDS.

E10.RACEWAY EXPANSION FITTINGS SHALL BE INSTALLED TO ALLOW FOR THERMAL EXPANSION AND CONTRACTION WHERE NECESSARY, PER CEC 300.7(B).

MANUFACTURER INSTRUCTIONS SHALL BE FOLLOWED AND ALL ACCESSORIES SHALL BE INSTALLED TO ENSURE PROPER FUNCTIONING OF FITTINGS.

E11.WHEN FIELD CUTTING IS REQUIRED, THE CONDUIT SHALL BE CUT SQUARE AND DEBURRED.

E12. CONDUIT SIZES NOT SPECIFIED SHOULD CONFORM TO CEC SPECIFICATIONS, TO INCLUDE FILL FACTOR AND DERATING FOR NUMBER OF CONDUCTORS.

E13. THE POWER CONDUCTORS MINIMUM SIZE SHALL BE #12 AWG.

E14. SAFETY REGULATIONS (LOCK OUT - TAG OUT, ETC.) IS THE FULL RESPONSIBILITY OF THE CONTRACTOR DURING CONSTRUCTION.

E15. THE CONDUCTOR SIZE IS BASED ON THE ESTIMATED CONDUIT ROUTING AS SHOWN IN THIS DRAWING PACKAGE. SHOULD THE CONDUIT'S LENGTH INCREASE

DUE TO RELOCATION OF SOURCE AND/OR ROUTING, THE CONDUITS AND THE CONDUCTORS MAY NEED TO BE RESIZED. SUBCONTRACTOR SHALL CONTACT HOLT PRIOR TO MAKING ANY FIELD CHANGES.

E16. ALL CONDUCTORS IN CONDUIT SHALL BE THWN-2, XHHW-2, RHW-2,PVWIRE, OR XLPE. USE BARE COPPER FOR GROUND FOR ALL EXTERNAL GROUNDING. PVWIRE

OR APPROVED EQUIVALENT SHALL BE USED FOR ALL EXPOSED OR HOMERUN CONDUCTORS.

E17. FOR INTERCONNECTION VIA BUS TAP:

A. OVERCURRENT PROTECTION (SWITCHING DEVICE AND MEANS OF DISCONNECT) MUST BE LOCATED PER CEC 240.21.

B. THE CONDUCTORS SHALL BE CRIMPED WITH A CRIMP-ON TERMINAL LUG, MANUFACTURED BY ILSCO, BURNDY, OAE. THE TERMINAL LUG SHALL HAVE IDENTIFICATION OR COLOR CODING TO MATCH THE CONDUCTOR SIZE.

TERMINAL LUGS SHALL HAVE LONG BARRELS TO PROVIDE 2 CRIMPS PER TERMINAL LUG PER CONDUCTOR.

C. CRIMPED TERMINAL LUGS SHALL BE CONSTRUCTED OF PURE COPPER AND TIN-PLATED FOR HIGH CONDUCTIVITY AND RATED FOR 600V AT 90°C WHEN USED WITH COPPER CONDUCTORS.

D. THE CRIMP MUST BE MADE WITH THE MANUFACTURER'S APPROVED TOOL DEVICE TO ACHIEVE THE PROPER CRIMP CONNECTION.

E. USE STAINLESS STEEL HARDWARE WITH THE FASTENER TORQUED TO

MANUFACTURER'S RECOMMENDATIONS ON ALL THREE PHASES TO COMPLY WITH ARTICLE 110.14 OF THE CEC.

F. MINIMUM BEND RADIUS SHALL BE OBSERVED TO MAINTAIN GOOD

CONDUCTOR QUALITY AND CONDUCTOR MANAGEMENT IN THE LOAD
CENTER OR TRANSFORMER. IF THIS BEND RADIUS IS TOO CONSTRICTING, USE A 90°CRIMP-ON LUG MANUFACTURED BY ILSCO, BURNDY, OAE. 90°

CRIMP-ON LUG MUST BE INSTALLED WITH RATED INSULATION THAT MEETS OR EXCEEDS THE CONDUCTORS' INSULATION IT IS BEING USED WITH. IT IS

RECOMMENDED THAT ACCEPTABLE CLEARANCES ARE MAINTAINED WITH THIS BUS TAP FOR SAFE, CONTINUOUS OPERATION .

G. FOLLOW MANUFACTURER'S GUIDELINES, OR THE APPLICABLE AHJ, FOR MODIFICATION OF BUS BAR(S).

E18. ALL CONDUITS SHALL BE FREE OF ANY OBSTRUCTIONS AND PROPERLY SECURED BEFORE CONDUCTOR IS PULLED.

E19. ELECTRICAL CONTRACTOR SHALL PROVIDE SIGNAGE TO ALL ELECTRICAL BOXES,

JUNCTION BOXES, PULL BOXES, DC DISCONNECTS, CONDUIT RUNS, AC DISCONNECTS, SUB PANELS AND MAIN SERVICES PER CEC ARTICLE 690.

E20. THE ELECTRICAL CONTRACTOR SHALL PERFORM INITIAL HARDWARE CHECKS AND

CONDUCTOR CONDUCTIVITY CHECKS PRIOR TO TERMINATING ANY
CONDUCTORS. COMPLETE MEGGER (INSULATION RESISTANCE) TESTING IN

REFERENCE TO GROUND AND TO EACH CONDUCTOR IN THE SAME CONDUIT ON ALL AC AND DC POWER CONDUCTORS. VERIFY AND DOCUMENT A RESISTANCE OF AT LEAST 100MΩ ON EACH CONDUCTOR USING A 1000V RAMP-UP TEST FOR ONE MINUTE. DO NOT MEGGER THE SOLAR MODULES. MEGGERING IS INTENDED FOR ALL POWER CONDUCTORS INSTALLED BY THE ELECTRICAL CONTRACTOR.

E21. ENSURE THAT ANY EXISTING LIGHTNING PROTECTION AIR TERMINALS EXTEND A MINIMUM OF 10” ABOVE THE TOP OF THE PV MODULES. THIS CAN BE

ACCOMPLISHED BY EXTENDING THE EXISTING AIR TERMINAL OR BY INSTALLING A

NEW, TALLER AIR TERMINAL WITH RATINGS EQUIVALENT TO THE EXISTING AIR TERMINAL.

E22.TORQUE: ALL CONDUCTORS LANDING IN SCREW CONNECTIONS MUST BE PROPERLY TIGHTENED TO THE MANUFACTURER'S TORQUE REQUIREMENTS. ALL BOLTED CONDUCTOR TERMINATIONS MUST BE TORQUED TO THEIR RATED VALUE.

IT IS THE SUBCONTRACTOR'S RESPONSIBILITY TO ENSURE ALL CONDUCTORS

WITH TORQUE REQUIREMENTS HAVE BEEN MARKED WITH A PAINT PEN OR PERMANENT MARKER AT THE TIME THAT THE TORQUE TEST WAS DONE.

E23. ALL METALLIC ENCLOSURES SHALL BE GROUNDED PER CEC ART. 250.

E24.EQUIPMENT USED SHALL BE RATED FOR THE ENVIRONMENT IN WHICH IT IS BEING INSTALLED (I.E. NEMA 1, 3R, 4, 4X,12).

E25.CONTRACTOR SHALL COMPLY WITH THE GENERAL DC CONDUCTOR CONDUIT MAX FILL OUTLINED IN THE TABLE BELOW. A SINGLE #6 THWN-2 EGC HAS BEEN INCLUDED IN THE FILL CALCULATIONS.

E26.CONTRACTOR SHALL NOT USE IMPACT DRIVERS ON INVERTERS OR WIRING BOXES.

ROOFING AND SEALING NOTES: (IF APPLICABLE)
R1. A POLYURETHANE BASED ADHESIVE SHALL BE APPLIED TO ANY DRILLED HOLE FOR FASTENING.

R2. ALL STANDOFFS SHALL BE MADE WATERTIGHT USING APPROVED METHODS BY

THE ROOFING MATERIAL MANUFACTURER, DISTRIBUTOR OR ENGINEER OF RECORD.

R3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY TRANSITION MATERIAL WHERE A DIFFERENCE OF 14" OF HEIGHT OR MORE BETWEEN THE ROOF AND STANDOFF BASE.

R4. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF RIGID FOAM OR

SPRAY FOAM TO FILL ANY VOID AROUND THE STANDOFF, FROM THE BASE UP TO 6" ABOVE THE ROOF.

MODULE INSTALLATION NOTES:

M1. REFER TO THE MODULE MANUAL FOR DETAILS ON RIGGING, UNPACKING, HANDLING, PLANNING, AND INSTALLATION.

M2. THE MODULES MAY BE SHIPPED WITH SEVERAL MODULES PER BOX. TAKE CARE

WHEN OPENING THE BOX TO ENSURE THAT ALL MODULES ARE SECURELY HANDLED.

M3. NEVER LEAVE A MODULE UNSUPPORTED OR UNSECURED. CONTRACTOR IS RESPONSIBLE FOR ALL MATERIAL HANDLING ON THE JOB SITE.

GENERAL SAFETY NOTE:

THE ARRAY LAYOUT INCORPORATES DESIGN CONSIDERATIONS SET-FORTH BY THE CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION, THE CFC AND THE IFC.

THESE GUIDELINES INCLUDE OFFSETS AND AISLE-WAYS TO ACCOMMODATE MOVEMENT ACROSS THE ROOF-TOP IN THE EVENT OF A FIRE. THERE ARE ALSO CONSIDERATIONS FOR MAXIMUM DIMENSIONS OF A CONTINUOUS ARRAY OR SUB-ARRAY. SINCE PHOTOVOLTAIC (PV) SOURCE AND OUTPUT CIRCUITS WILL BE ENERGIZED AS LONG AS THERE IS VISIBLE

LIGHT, LABELING IS SPECIFIED IN THE PLANS TO DISTINGUISH PV CONDUITS FROM EXISTING SITE CONDUIT. BEYOND CAL-FIRE, THESE PLANS INCORPORATE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) GUIDELINES. THIS MAINLY PERTAINS TO MINIMUM OFFSETS FROM PARAPETS OR THE ROOF EDGE.

ELECTRICALLY, THE DESIGN SHALL MEET ALL EQUIPMENT WORKING CLEARANCES AS DEFINED IN CEC ARTICLE 110.26 AS WELL AS CAREFUL CONSIDERATION OF EGRESS PATHS WHEN EQUIPMENT DOORS ARE OPENED. EQUIPMENT ELEVATION DRAWINGS INCORPORATE

TRUE-SCALED DIMENSIONS OF TRADE-SIZE CONDUIT BODIES AND SWEEPS TO ENSURE PROPER CONDUCTOR BEND RADII. THIS MEASURE WILL ENSURE THAT THE CORRECT CONDUIT FITTING WILL FIT THE ALLOTTED SPACE. FURTHER, ALL EQUIPMENT SPECIFIED SHALL BE LISTED BY A NATIONALLY RECOGNIZED TEST LAB (UL, IEEE, ETC.).

THE PLANS ALSO INCORPORATE EQUIPMENT AND GROUNDING DETAILS TO ENSURE

PROPER INSTALLATION AS WELL AS A COMPLETE SHEET OF THE REQUIRED LABELS AND MARKINGS. THE LABELS ADDRESS PERTINENT ARTICLES OF THE CEC AS WELL AS

STANDARDS ADOPTED FROM PAST PROJECTS WITH VARIOUS UTILITY COMPANIES AND LOCAL AUTHORITIES HAVING JURISDICTION.
10 AWG PV WIRE CONDUIT FILL
CONDUIT SIZE EMT IMC RMC PVC40 HDPE LFMC
3/4"2 3 2 2 2 2
1"5 5 5 4 4 5
1-1/4"9 10 9 9 9 9
1-1/2"13 14 13 12 12 12
2"22 24 22 22 22 21
2-1/2"40 34 33 31 31 33
Packet Page 843 of 1189Attachment 2 Page 91 of 159

STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WI101 SITE PLAN.dwg 3/13/24 - 8:54amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

GENERAL SHEET NOTES

1.ALL DIMENSIONS ARE APPROXIMATE AND MUST BE FIELD
VERIFIED.

2.CONDUIT AND PULL BOXES SHALL BE INSTALLED IN
ACCORDANCE WITH THE FOLLOWING NEC ARTICLES: 342.26
FOR IMC, 344.26 FOR RMC, 352.26 FOR PVC, 353.26 FOR
HDPE, 358.26 FOR EMT CONDUIT, AND 314.28-314.30 FOR
PULLBOXES.

3.IMPACT DRIVERS ARE NOT APPROVED FOR USE ON
INVERTERS OR WIRING BOXES.

SHEET KEYNOTES

1.INVERTERS AND OTHER PV EQUIPMENT AT ARRAY SHALL BE
RACK MOUNTED.

2.SWITCHGEAR, TRANSFORMER, AND BESS ARE TO BE PAD
MOUNTED.

3.THIS AREA HAS BEEN DESIGNATED AS A WETLAND
MITIGATION ZONE. ALL WORK FOR THE SCOPE OF THIS

PROJECT IS TO AVOID THIS AREA AND LEAVE IT
UNDISTURBED.

SITE PLAN
WI101.1
SCALE: 1/64" = 1'-0"
SITE PLANA1
TRUE
NORTH
SCALE: NTS
SITE PLAN - SUMMARYD3

PV SOLAR SYSTEM SUMMARY
(TOTAL MODULE COUNT) MODULE MANF. & MODEL NUMBER / STC DC RATING (3000) QCELLS Q.PEAK DUO XL-G11S, 595W TOTAL STRINGS OF MODULES PER STRING 120 STRINGS OF 25 MODULES

PV ARRAY RACKING STYLE / MANUFACTURER AND MODEL FIXED-TILT GROUND MOUNT / TERRASMART GLIDE AGILE TOTAL STC DC SYSTEM SIZE 1785.00 kW
(TOTAL INVERTER COUNT) INVERTER MANF. AND MODEL (5) CHINT CPS SCH275KLT-DO/US-800-36, 250kW AC INVERTER CEC EFFICIENCY 98.5% (275kW)
SITE LATITUDE 38° 16' 33" N
ARRAY AZIMUTH / MODULE TILT 180°/ 20°
ASHRAE DESIGN TEMPERATURE EXTREME MIN. / 2% HIGH -3°C/36°C INTERCONNECTION VOLTAGE 480 VAC 3ɸ
INTERCONNECTION OCPD RATING 3000A

INTERCONNECTION TYPE LINE-SIDE TAP AT SOLAR READY BREAKER

PV ARRAY
(3000) MODULES
(5) CHINT INVERTERS
(2) CHINT AC COMBINERS
(FIXED-TILT GROUND MOUNT)

PV EQUIPMENT AT INTERCONNECTION
(1) AC UTILITY DISCONNECT
(PAD MOUNTED)

PV EQUIPMENT FOR INTERCONNECTION
(1) PV TRANSFORMER
(2) SOCOMEC SUNSYS HES L BESS UNITS
(1) AC SWITCHGEAR
(1) PV METER
(PAD MOUNTED)
UG AC CONDUIT RUN (TYP.)
1 2
2 (3) EXISTING CONDUITS IN JOINT TRENCH;

FIBER, WATER, & ELECTRICAL

JOINT TRENCH CROSSING

WETLAND MITIGATION ZONE

TO BE AVOIDED
3 NEW 12' WIDE GRAVEL ACCESS PATH
(2) TREES TO BE REMOVED
Packet Page 844 of 1189Attachment 2 Page 92 of 159

STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WI101 SITE PLAN.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

GENERAL SHEET NOTES

1.ALL DIMENSIONS ARE APPROXIMATE AND MUST BE FIELD
VERIFIED.

2.CONDUIT AND PULL BOXES SHALL BE INSTALLED IN
ACCORDANCE WITH THE FOLLOWING NEC ARTICLES: 342.26
FOR IMC, 344.26 FOR RMC, 352.26 FOR PVC, 353.26 FOR
HDPE, 358.26 FOR EMT CONDUIT, AND 314.28-314.30 FOR
PULLBOXES.

3.IMPACT DRIVERS ARE NOT APPROVED FOR USE ON
INVERTERS OR WIRING BOXES.

SHEET KEYNOTES

1.INVERTERS AND OTHER PV EQUIPMENT AT ARRAY SHALL BE
RACK MOUNTED.

2.SWITCHGEAR, TRANSFORMER, AND BESS ARE TO BE PAD
MOUNTED.

3.THIS AREA HAS BEEN DESIGNATED AS A WETLAND
MITIGATION ZONE. ALL WORK FOR THE SCOPE OF THIS

PROJECT IS TO AVOID THIS AREA AND LEAVE IT
UNDISTURBED.

SITE PLAN -
ARRAY
WI101.2
SCALE: 1/32" = 1'-0"
SITE PLAN - ARRAYA1
TRUE
NORTH
PV SWITCHGEAR 02
(1) AC RECOMBINER
(1) SERVICE DISCONNECT
(1) DAS ENCLOSURE
(PAD MOUNTED)
30' ACCESS GATE
INV.01, INV.02, INV.03 ACC.01
2 PV ARRAY
(3000) MODULES
(5) CHINT INVERTERS
(2) CHINT AC COMBINERS
(FIXED-TILT GROUND MOUNT)

NEW CHAIN-LINK FENCE
APPROX. 1960'
1 INV.04, INV.05, ACC.02
1 1
UG AC CONDUIT RUN (TYP.)
(2) UP X (175) WIDE ROW
(2) UP X (125) WIDE ROW
(2) UP X (175) WIDE ROW
(2) UP X (175) WIDE ROW
(2) UP X (175) WIDE ROW
(2) UP X (175) WIDE ROW
(2) UP X (175) WIDE ROW
(2) UP X (175) WIDE ROW
(2) UP X (100) WIDE ROW
(2) UP X (50) WIDE ROW

WETLAND MITIGATION ZONE

TO BE AVOIDED
3 NEW CULVERT FOR VEHICLE

ACCESS OVER DITCH
Packet Page 845 of 1189Attachment 2 Page 93 of 159

AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbFeatureLine (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WI101 SITE PLAN.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

GENERAL SHEET NOTES

1.ALL DIMENSIONS ARE APPROXIMATE AND MUST BE FIELD
VERIFIED.

2.CONDUIT AND PULL BOXES SHALL BE INSTALLED IN
ACCORDANCE WITH THE FOLLOWING NEC ARTICLES: 342.26
FOR IMC, 344.26 FOR RMC, 352.26 FOR PVC, 353.26 FOR
HDPE, 358.26 FOR EMT CONDUIT, AND 314.28-314.30 FOR
PULLBOXES.

3.IMPACT DRIVERS ARE NOT APPROVED FOR USE ON
INVERTERS OR WIRING BOXES.

SHEET KEYNOTES

1.SWITCHGEAR, TRANSFORMER, AND BESS ARE TO BE PAD
MOUNTED.

SITE PLAN - POI
WI101.3
SCALE: 3/32" = 1'-0"
SITE PLAN - POIA1
TRUE
NORTH

PV EQUIPMENT FOR INTERCONNECTION
(1) AC SWITCHGEAR
(1) PV METER
(PAD MOUNTED)

PV EQUIPMENT FOR INTERCONNECTION
(1) PV TRANSFORMER
(PAD MOUNTED)

PV EQUIPMENT FOR INTERCONNECTION
(1) SOCOMEC SUNSYS HES L BESS UNIT 01, 250kW
(PAD MOUNTED)

PV EQUIPMENT AT INTERCONNECTION
(1) AC UTILITY DISCONNECT
(PAD MOUNTED)

INTERCONNECTION AT MAIN

SWITCHGEAR IN ELECTRICAL ROOM

UTILIZE CONDUITS DESIGNATED FOR SOLAR
1 1
1 1

NEW CHAIN-LINK FENCE
APPROX. 175'

PV EQUIPMENT FOR INTERCONNECTION
(1) SOCOMEC SUNSYS HES L BESS UNIT 02, 200kW
(PAD MOUNTED)
1 EXISTING WEATHER STATION

TO BE RELOCATED
EXISTING 12" WATER LINE

TO BE RELOCATED

PG&E UTILITY TRANSFORMER
NEW 12' WIDE GRAVEL ACCESS PATH
(2) TREES TO BE REMOVED
Packet Page 846 of 1189Attachment 2 Page 94 of 159

PHOTOVOLTAIC ARRAY
(3000) QCELLS Q.PEAK DUO XL-G11S, 595W MODULES, OAE
(120) STRINGS OF (25) MODULES
(5) CHINT CPS SCH275KTL-DO/US-800-36 INVERTERS - 250KW AC SELECTED RACKING SHALL BE UL 2703 LISTED AS AN EGC
BARE 6 AWG EGC ATTACHED TO RAIL ENDS WITH WEEB LUGS
1500V PV WIRE FOR ALL SOURCE WIRING

BATTERY ENERGY STORAGE SYSTEM
(1) SOCOMEC SUNSYS-HES-L-250kW-931kWh UNIT
(1) SOCOMEC SUNSYS-HES-L-200kW-931kWh UNIT
992.5A
#4/0 Cu BOND TO

GROUND RING (TYP)
2 4
PV SWITCHGEAR (SWGR.02)
800V, 1400A BUS (OAE),
NEMA 3R, 3ɸ, 3W , 65 KAIC
PER CEC 705.12(B)(3)(3)

SERVICE ENTRY RATED

PAD MOUNTED
1400A FUSES

BOLTED PRESSURE SWITCH
GFCI PER CEC 230.95
(WITH VIEWING WINDOW IF

REQUIRED BY AHJ)
7 750A/3P
SECTION 2 - ACRC
(1) 750A, 3P BREAKER
(1) 500A, 3P BREAKER
(2) 20A, 3P BREAKERS
(1) 20A, 2P BREAKER

WEATHER

STATION
(AT ARRAY)
IGHI
IPOA
TAMB.

TCELL
VWIND
RS-485 IN 1" EMT/PVC40 ~250'
RS-485 IN 1" EMT/PVC40 ~60' (POWER)
K
J

MONITORING BOX
24DC/800V

GSM CELL

MODEM DAS POWER
(2+G) #12AWG THWN-2
M
DATA
LOGGER

VOLTAGE SENSING
(3+G) 12 AWG THWN-2

PRODUCTION MEASUREMENT (PV)
(6+G) 12 AWG CT CABLE
20A/2P
20A/3P
20A/3P
SURGE

ARRESTOR

EXOTHERMIC BOND (TYP)
(1) 3/4" X 10' GROUNDING

ELECTRODES (TYP OF ALL

GROUND RODS)

GROUND ROD

GROUND ROD

GROUND ROD
RS-485 IN 1" EMT/PVC40 ~60' (DATA)
M

PRODUCTION MEASUREMENT (BESS)
(3+G) 12 AWG THWN-2, IN 1" PVC40 ~870'
TO BESS.01,
SEE SHEET WP601.2
SECTION 1 - SERVICE
DISCONNECT ACD.02
500A/3P
CHINT SCA275KTL-DO/US-800-36
800V 3PH-3W-198.5A AC OUTPUT,

DC & AC SURGE ARRESTORS,

AFCI - RACK MOUNTED
1 3
DC
AC
25A(TYP)

GFDI COMM
INV.01
198.5A
1 3 9 10 11
A
1 2 25
# OF MODULES IN SERIES

18.8A
(4) ADDITIONAL

INVERTERS
IDENTICAL TO INV.01
B 12

TO MV XFMR,
SEE SHEET WP601.3
5 (1) 1" EMT APPROX 10'
24 STRINGS

PER INVERTER
AC COMBINER (ACC.01)
800V, 1000A BUS (OAE)
NEMA 3R, 3W, FUSED 800A

DISCONNECT
CEC 705.12(B)(3)(3)

RACK MOUNTED
595.5A
G
12 198.5AINV.02
C
12 AC COMBINER (ACC.02)
800V, 1000A BUS (OAE)
NEMA 3R, 3W, FUSED 800A

DISCONNECT
CEC 705.12(B)(3)(3)

RACK MOUNTED
397.0A
H
12 198.5AINV.04
E
12 198.5AINV.05
F
12 198.5AINV.03
D
12 13

PRODUCTION MEASUREMENT (BESS)
(3+G) 12 AWG THWN-2, IN 1" PVC40 ~870'
TO BESS.02,
SEE SHEET WP601.2

PHOTOVOLTAIC ARRAY
(3000) QCELLS Q.PEAK DUO XL-G11S, 595W MODULES, OAE
(120) STRINGS OF (25) MODULES
STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WP601 ELECTRICAL SLD.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

ELECTRICAL SLD -
PV
WP601.1
SCALE: NTS
ELECTRICAL SLD - PVA1

GENERAL SHEET NOTES

SHEET KEYNOTES

1.CONDUIT ABOVE GRADE SHALL BE EMT. ALL CONDUIT BELOW
GRADE SHALL BE PVC OR HDPE WITH RMC RISER. USE
SCHEDULE 40 FOR BELOW GRADE CONDUIT RUN UNDER
GRASSY AREAS.

2.ALL COPPER (CU) CONDUCTORS IN CONDUIT SHALL BE
THWN-2 OR XLPE. ALL EXPOSED CONDUCTORS SHALL BE
PVWIRE. ALL ALUMINUM (AL) CONDUCTORS IN CONDUIT
SHALL BE XHHW-2, OR XLPE.

3.ALUMINUM CONDUCTORS SHALL BE BRUSHED AND TREATED
WITH ANTIOXIDANT COMPOUND AT TERMINAL POINTS.

4.TORQUE: ALL CONDUCTORS LANDING IN SCREW

CONNECTIONS MUST BE PROPERLY TIGHTENED TO THE
MANUFACTURER'S TORQUE REQUIREMENTS. ALL BOLTED

CONDUCTOR TERMINATIONS MUST BE TORQUED TO THEIR
RATED VALUE. IT IS THE SUBCONTRACTOR'S

RESPONSIBILITY TO ENSURE ALL CONDUCTORS WITH

TORQUE REQUIREMENTS HAVE BEEN MARKED WITH A PAINT

PEN OR PERMANENT MARKER AT THE TIME THAT THE
TORQUE TEST WAS DONE.

5.SOLAR ENERGY PRODUCTION MONITORING SHALL BE
INSTALLED AT INTERCONNECTION.

6.IMPACT DRIVERS ARE NOT APPROVED FOR USE ON
INVERTERS OR WIRE BOXES.

1.EQUIPMENT SHALL BE INSTALLED AND LABELED IN

ACCORDANCE WITH THE CEC AND ALL APPLICABLE

REQUIREMENTS OF THE SERVING UTILITY COMPANY AND
LOCAL AUTHORITY HAVING JURISDICTION (AHJ).

2.DISCONNECTS MUST COMPLY WITH CEC 690.15 AND PROVIDE
WARNING SIGN PER CEC 690.13.

3.LISTING AGENCY NAMES AND NUMBERS TO BE INDICATED ON
POWER INVERTER AND SOLAR MODULES PER CEC 110.3(B).

4.LABELED "PHOTOVOLTAIC SYSTEM AC COMBINER."

5.UTILITY METER LABELED "PHOTOVOLTAIC SYSTEM
MONITOR.”

6.LABELED “PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT”

SWITCH TO BE VISUAL OPEN AND ACCESSIBLE AND
CONFORM TO CEC 705.22.

7.LABELED “WARNING: THIS PANEL SUPPLIED BY MULTIPLE
SOURCES OF POWER: 1. UTILITY POWER, 2. PHOTOVOLTAIC
SYSTEM - DISCONNECT ALL SOURCES BEFORE SERVICING.”

8.POINT OF INTERCONNECTION SHALL BE IN ACCORDANCE
WITH CEC 705.11.

9.PROVIDE IDENTIFICATION ALONG WITH POSITIVE & NEGATIVE CONDUCTORS PER CEC 210.5(C)(2).

10.MINIMUM BENDING RADIUS OF PHOTOVOLTAIC MODULE

LEADS SHALL CONFORM WITH MINIMUM BENDING RADIUS

SET FORTH BY THE MODULE MANUFACTURER OR ARTICLE
338.24, WHICHEVER IS MORE STRINGENT.

11.MATING CONNECTORS FOR PV SOURCE CIRCUITS, PV

JUMPER CABLES, AND MODULE LEVEL POWER ELECTRONICS

TO BE LISED AND IDENTIFIED FOR INTERMATABILITY, AS
DESCRIBED IN MANUFACTURER'S INSTRUCTIONS. MATING

CONNECTORS THAT ARE NOT LISTED ARE NOT TO BE
UTILIZED FOR PROJECT.

12.AC POWER CONDUITS TO CONVEY (3) CURRENT CARRYING
CONDUCTORS AND AN EGC. NO NEUTRAL REQUIRED.

13.ALL INVERTERS ARE TO HAVE THE MAX 250kW AC OUTPUT
OPTION SELECTED. REFER TO INVERTER DATA SHEET ON
SHEET WK801.

14.SHADE STRUCTURE GROUNDING NOTE, EACH SHADE

STRUCTURE SHALL RECEIVE A UFER GROUND CONSISTING
OF 20' OF BARE #4AWG CU CADWELDED TO FOOTING REBAR
CAGE AND CADWELDED TO STEEL COLUMN.

Packet Page 847 of 1189Attachment 2 Page 95 of 159

SOCOMEC SUNSYS HES L BESS.01
480V, 250kW/930kWh,
250kVA RATED, NEMA 3R

PAD MOUNTED

EXOTHERMIC BOND (TYP)
3/4" X 10' GROUNDING

ELECTRODES (TYP)

GROUND ROD

GROUND ROD
301.0AM
TO SWGR.01,
SEE SHEET WP601.3
BATTERY CABINET 5 INVERTER
DC
AC
COMM
250kW,
480V, 3P, 3W
BATTERY CABINET 4BATTERY CABINET 3BATTERY CABINET 2BATTERY CABINET 1

TO MONITORING,
SEE SHEET WP601.1
241.0AN
TO SWGR.01,
SEE SHEET WP601.3
BATTERY CABINET 5 INVERTER
DC
AC
COMM
200kW,
480V, 3P, 3W
BATTERY CABINET 4BATTERY CABINET 3BATTERY CABINET 2BATTERY CABINET 1

TO MONITORING,
SEE SHEET WP601.1

GROUND ROD
SOCOMEC SUNSYS HES L BESS.02
480V, 200kW/930kWh,
200kVA RATED, NEMA 3R

PAD MOUNTED

PHOTOVOLTAIC ARRAY
(3000) QCELLS Q.PEAK DUO XL-G11S, 595W MODULES, OAE
(120) STRINGS OF (25) MODULES
(5) CHINT CPS SCH275KTL-DO/US-800-36 INVERTERS - 250KW AC SELECTED RACKING SHALL BE UL 2703 LISTED AS AN EGC
BARE 6 AWG EGC ATTACHED TO RAIL ENDS WITH WEEB LUGS
1500V PV WIRE FOR ALL SOURCE WIRING

BATTERY ENERGY STORAGE SYSTEM
(1) SOCOMEC SUNSYS-HES-L-250kW-931kWh UNIT
(1) SOCOMEC SUNSYS-HES-L-200kW-931kWh UNIT STAMP: PROJECT:1301 Cap. O TX Hwy S #B315 Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WP601 ELECTRICAL SLD.dwg 3/13/24 - 8:54amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

ELECTRICAL SLD -
BESS
WP601.2
SCALE: NTS
ELECTRICAL SLD - BESSA1

GENERAL SHEET NOTES

SHEET KEYNOTES

1.CONDUIT ABOVE GRADE SHALL BE EMT. ALL CONDUIT BELOW
GRADE SHALL BE PVC OR HDPE WITH RMC RISER. USE
SCHEDULE 40 FOR BELOW GRADE CONDUIT RUN UNDER
GRASSY AREAS.

2.ALL COPPER (CU) CONDUCTORS IN CONDUIT SHALL BE
THWN-2 OR XLPE. ALL EXPOSED CONDUCTORS SHALL BE
PVWIRE. ALL ALUMINUM (AL) CONDUCTORS IN CONDUIT
SHALL BE XHHW-2, OR XLPE.

3.ALUMINUM CONDUCTORS SHALL BE BRUSHED AND TREATED
WITH ANTIOXIDANT COMPOUND AT TERMINAL POINTS.

4.TORQUE: ALL CONDUCTORS LANDING IN SCREW

CONNECTIONS MUST BE PROPERLY TIGHTENED TO THE
MANUFACTURER'S TORQUE REQUIREMENTS. ALL BOLTED

CONDUCTOR TERMINATIONS MUST BE TORQUED TO THEIR
RATED VALUE. IT IS THE SUBCONTRACTOR'S

RESPONSIBILITY TO ENSURE ALL CONDUCTORS WITH

TORQUE REQUIREMENTS HAVE BEEN MARKED WITH A PAINT

PEN OR PERMANENT MARKER AT THE TIME THAT THE
TORQUE TEST WAS DONE.

5.SOLAR ENERGY PRODUCTION MONITORING SHALL BE
INSTALLED AT INTERCONNECTION.

6.IMPACT DRIVERS ARE NOT APPROVED FOR USE ON
INVERTERS OR WIRE BOXES.

1.EQUIPMENT SHALL BE INSTALLED AND LABELED IN

ACCORDANCE WITH THE CEC AND ALL APPLICABLE

REQUIREMENTS OF THE SERVING UTILITY COMPANY AND
LOCAL AUTHORITY HAVING JURISDICTION (AHJ).

2.DISCONNECTS MUST COMPLY WITH CEC 690.15 AND PROVIDE
WARNING SIGN PER CEC 690.13.

3.LISTING AGENCY NAMES AND NUMBERS TO BE INDICATED ON
POWER INVERTER AND SOLAR MODULES PER CEC 110.3(B).

4.LABELED "PHOTOVOLTAIC SYSTEM AC COMBINER."

5.UTILITY METER LABELED "PHOTOVOLTAIC SYSTEM
MONITOR.”

6.LABELED “PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT”

SWITCH TO BE VISUAL OPEN AND ACCESSIBLE AND
CONFORM TO CEC 705.22.

7.LABELED “WARNING: THIS PANEL SUPPLIED BY MULTIPLE
SOURCES OF POWER: 1. UTILITY POWER, 2. PHOTOVOLTAIC
SYSTEM - DISCONNECT ALL SOURCES BEFORE SERVICING.”

8.POINT OF INTERCONNECTION SHALL BE IN ACCORDANCE
WITH CEC 705.11.

9.PROVIDE IDENTIFICATION ALONG WITH POSITIVE & NEGATIVE CONDUCTORS PER CEC 210.5(C)(2).

10.MINIMUM BENDING RADIUS OF PHOTOVOLTAIC MODULE

LEADS SHALL CONFORM WITH MINIMUM BENDING RADIUS

SET FORTH BY THE MODULE MANUFACTURER OR ARTICLE
338.24, WHICHEVER IS MORE STRINGENT.

11.MATING CONNECTORS FOR PV SOURCE CIRCUITS, PV

JUMPER CABLES, AND MODULE LEVEL POWER ELECTRONICS

TO BE LISED AND IDENTIFIED FOR INTERMATABILITY, AS
DESCRIBED IN MANUFACTURER'S INSTRUCTIONS. MATING

CONNECTORS THAT ARE NOT LISTED ARE NOT TO BE
UTILIZED FOR PROJECT.

12.AC POWER CONDUITS TO CONVEY (3) CURRENT CARRYING
CONDUCTORS AND AN EGC. NO NEUTRAL REQUIRED.

13.ALL INVERTERS ARE TO HAVE THE MAX 250kW AC OUTPUT
OPTION SELECTED. REFER TO INVERTER DATA SHEET ON
SHEET WK801.

14.SHADE STRUCTURE GROUNDING NOTE, EACH SHADE

STRUCTURE SHALL RECEIVE A UFER GROUND CONSISTING
OF 20' OF BARE #4AWG CU CADWELDED TO FOOTING REBAR
CAGE AND CADWELDED TO STEEL COLUMN.

Packet Page 848 of 1189Attachment 2 Page 96 of 159

800V 480V

PV TRANSFORMER
1500kVA, NEMA 3R, D-YG,
Z = 5.75%, X/R = 7.5

PAD MOUNTED
PVXFMR.01
Bay-O-Net
2500A
480V (8.4 MCOV)

LIGHTNING ARRESTOR
#4/0 Cu BOND TO

GROUND RING (TYP)EXOTHERMIC BOND (TYP)
(1) 3/4" X 10' GROUNDING

ELECTRODES (TYP OF ALL

GROUND RODS)

GROUND ROD

GROUND ROD

GROUND ROD
992.5AK
MAIN

BREAKER
3000AF, 3000AT,

ELECTRONIC TRIP,
480V, 65kAIC

GFCI PER
CEC 230.95
SECTION 1 - MAIN

BREAKER
2500AS
2500AF
3P
(WITH

VIEWING

WINDOW IF

REQUIRED

BY AHJ)
SECTION 4 -

PV SERVICE
FUSED

DISCONNECT
400AF
350AT
3P
1654.9AL
241.0AN

TO PV SWITCHGEAR,
SEE SHEET WP601.01
TO BESS.02,
SEE SHEET WP601.2

UTILITY

SERVICE
480V
480VAC, 3PH, 4W
4000A BUS, 4000A MAIN (EXST)
7 MSB

EXISTING
LOADS
(EXST)

EXISTING

PG&E METER
#1010078883
M
8 UTILITY TRANSFORMER

INTERCONNECTION
- 3000A, 480VAC, 3ɸ
- LINE-SIDE TAP VIA

SOLAR READY

BREAKER SECTION
- PER CEC 705.11
3000AF
3000AT
3PQ
2500AF
2000AT
3P
N-
ATS
TO EXISTING 1250kW

GENERATOR

PV UTILITY DISCONNECT

EATON PRINGLE BOLTED PRESSURE
SWITCH QA-30-3-4-B-120-480-K-A-5, OAE
480V, 3000A FUSIBLE W/ 3000A FUSES,
NEMA 3R, 3P, 4W, VIEWABLE, LOCKABLE,
PAD MOUNTED WITHIN 10' OF

INTERCONNECTION
2 6
3000A
ACD.01
PV & BESS SWITCHGEAR (SWGR.01)
480V, 3200A BUS (OAE),
NEMA 3R, 3ɸ, 4W , 65 KAIC
PER CEC 705.12(B)(3)(3)

SERVICE ENTRY RATED

PAD MOUNTED
7 4000AF
4000AT
3P
P
2196.9A
LSIG
2196.9A
SECTION 2 -

BESS SERVICE

BREAKERS
400AF
400AT
3P
301.0AM
TO BESS.01,
SEE SHEET WP601.2
2500AS
2500AF
3P
M
NGOM

PER PG&E
SPECS
SECTION 3 -

PV METER
480V, 2500A, 3ɸ
5 PHOTOVOLTAIC ARRAY
(3000) QCELLS Q.PEAK DUO XL-G11S, 595W MODULES, OAE
(120) STRINGS OF (25) MODULES
(5) CHINT CPS SCH275KTL-DO/US-800-36 INVERTERS - 250KW AC SELECTED RACKING SHALL BE UL 2703 LISTED AS AN EGC
BARE 6 AWG EGC ATTACHED TO RAIL ENDS WITH WEEB LUGS
1500V PV WIRE FOR ALL SOURCE WIRING

BATTERY ENERGY STORAGE SYSTEM
(1) SOCOMEC SUNSYS-HES-L-250kW-931kWh UNIT
(1) SOCOMEC SUNSYS-HES-L-200kW-931kWh UNIT STAMP: PROJECT:1301 Cap. O TX Hwy S #B315 Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WP601 ELECTRICAL SLD.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

ELECTRICAL SLD -
POI
WP601.3
SCALE: NTS
ELECTRICAL SLD - POIA1

GENERAL SHEET NOTES

SHEET KEYNOTES

1.CONDUIT ABOVE GRADE SHALL BE EMT. ALL CONDUIT BELOW
GRADE SHALL BE PVC OR HDPE WITH RMC RISER. USE
SCHEDULE 40 FOR BELOW GRADE CONDUIT RUN UNDER
GRASSY AREAS.

2.ALL COPPER (CU) CONDUCTORS IN CONDUIT SHALL BE
THWN-2 OR XLPE. ALL EXPOSED CONDUCTORS SHALL BE
PVWIRE. ALL ALUMINUM (AL) CONDUCTORS IN CONDUIT
SHALL BE XHHW-2, OR XLPE.

3.ALUMINUM CONDUCTORS SHALL BE BRUSHED AND TREATED
WITH ANTIOXIDANT COMPOUND AT TERMINAL POINTS.

4.TORQUE: ALL CONDUCTORS LANDING IN SCREW

CONNECTIONS MUST BE PROPERLY TIGHTENED TO THE
MANUFACTURER'S TORQUE REQUIREMENTS. ALL BOLTED

CONDUCTOR TERMINATIONS MUST BE TORQUED TO THEIR
RATED VALUE. IT IS THE SUBCONTRACTOR'S

RESPONSIBILITY TO ENSURE ALL CONDUCTORS WITH

TORQUE REQUIREMENTS HAVE BEEN MARKED WITH A PAINT

PEN OR PERMANENT MARKER AT THE TIME THAT THE
TORQUE TEST WAS DONE.

5.SOLAR ENERGY PRODUCTION MONITORING SHALL BE
INSTALLED AT INTERCONNECTION.

6.IMPACT DRIVERS ARE NOT APPROVED FOR USE ON
INVERTERS OR WIRE BOXES.

1.EQUIPMENT SHALL BE INSTALLED AND LABELED IN

ACCORDANCE WITH THE CEC AND ALL APPLICABLE

REQUIREMENTS OF THE SERVING UTILITY COMPANY AND
LOCAL AUTHORITY HAVING JURISDICTION (AHJ).

2.DISCONNECTS MUST COMPLY WITH CEC 690.15 AND PROVIDE
WARNING SIGN PER CEC 690.13.

3.LISTING AGENCY NAMES AND NUMBERS TO BE INDICATED ON
POWER INVERTER AND SOLAR MODULES PER CEC 110.3(B).

4.LABELED "PHOTOVOLTAIC SYSTEM AC COMBINER."

5.UTILITY METER LABELED "PHOTOVOLTAIC SYSTEM
MONITOR.”

6.LABELED “PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT”

SWITCH TO BE VISUAL OPEN AND ACCESSIBLE AND
CONFORM TO CEC 705.22.

7.LABELED “WARNING: THIS PANEL SUPPLIED BY MULTIPLE
SOURCES OF POWER: 1. UTILITY POWER, 2. PHOTOVOLTAIC
SYSTEM - DISCONNECT ALL SOURCES BEFORE SERVICING.”

8.POINT OF INTERCONNECTION SHALL BE IN ACCORDANCE
WITH CEC 705.11.

9.PROVIDE IDENTIFICATION ALONG WITH POSITIVE & NEGATIVE CONDUCTORS PER CEC 210.5(C)(2).

10.MINIMUM BENDING RADIUS OF PHOTOVOLTAIC MODULE

LEADS SHALL CONFORM WITH MINIMUM BENDING RADIUS

SET FORTH BY THE MODULE MANUFACTURER OR ARTICLE
338.24, WHICHEVER IS MORE STRINGENT.

11.MATING CONNECTORS FOR PV SOURCE CIRCUITS, PV

JUMPER CABLES, AND MODULE LEVEL POWER ELECTRONICS

TO BE LISED AND IDENTIFIED FOR INTERMATABILITY, AS
DESCRIBED IN MANUFACTURER'S INSTRUCTIONS. MATING

CONNECTORS THAT ARE NOT LISTED ARE NOT TO BE
UTILIZED FOR PROJECT.

12.AC POWER CONDUITS TO CONVEY (3) CURRENT CARRYING
CONDUCTORS AND AN EGC. NO NEUTRAL REQUIRED.

13.ALL INVERTERS ARE TO HAVE THE MAX 250kW AC OUTPUT
OPTION SELECTED. REFER TO INVERTER DATA SHEET ON
SHEET WK801.

14.SHADE STRUCTURE GROUNDING NOTE, EACH SHADE

STRUCTURE SHALL RECEIVE A UFER GROUND CONSISTING
OF 20' OF BARE #4AWG CU CADWELDED TO FOOTING REBAR
CAGE AND CADWELDED TO STEEL COLUMN.

Packet Page 849 of 1189Attachment 2 Page 97 of 159

STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WK801 DATA SHEETS.dwg 3/13/24 - 8:54amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

DATA SHEETS
WK801
Scale: NTS
DATA SHEETS - MODULEA1 Scale: NTS
DATA SHEETS - INVERTERSA4
Scale: NTS
DATA SHEETS - MONITORINGC1 Scale: NTS
DATA SHEETS - RACKINGC4
Packet Page 850 of 1189Attachment 2 Page 98 of 159

STAMP: PROJECT:1301 Cap. O TX Hwy S #B315
Austin, TX 78746
www.holtrenewables.com
C:\Users\samuel.sherman\onedrive - holt\Desktop\city of fairfield, ca\03 - design\3.3 drawings\3.32 Sheets\WK802 DATA SHEETS.dwg 3/13/24 - 8:53amCITY OF FAIRFIELDWATERMAN TREATMENT PLANT SOLAR PROJECT1785.0 kW DC STC RATING2900 VISTA GRANDE CIRCLEFAIRFIELD, CA 954341 2 3 4 5 6 E
D
C
B
A
1 2 3 4 5 6
E
D
C
B
A

PRICING SET
HoltRenewables, 2024

AS NOTED
ANSI D - 22X34 J H G F E D C B A 3/13/2024 SLS 30% SET CH CLIENT:FOR REVIEW ONLY

NOT FOR

CONSTRUCTION

DATA SHEETS
WK802
Scale: NTS
DATA SHEETS - CPS AC COMBINERA1 Scale: NTS
DATA SHEETS - INVERTER RACKINGA4
Scale: NTS
DATA SHEETS - BESSC1
Packet Page 851 of 1189Attachment 2 Page 99 of 159

36 ATTACHMENT B - SITE ASSESSMENT TABLE

TO GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Packet Page 852 of 1189Attachment 2 Page 100 of 159

Contractor: Onyx
Section 1: Site and System Information
Site Name Waterman Treatment Plant
Site Designator A
Service Account ID 7605929944
Meter Number 1010078883
Service Address 0
Site Address 2900 Vista Grande Circle, Fairfield, CA 95434 Solar Facility Target "Annual Production Estimate"(kWh)3110442 Target Battery System Size(kW)450 (200 kW + 250 kW)
Target Battery System Size(kWh)1860

NEM-A(Y/N)N
NEM-A SAIDs N/A
Annual Meter Consumption (kWh)3659981
Annual Ex-Solar Meter Consumption (kWh)3659981
Meter Max Demand (kW)768
Ex-Solar Max Demand (kW)768
Current Rate Schedule B-19
Post Construction Rate Schedule B-19-S
Interconnection Point Rating (Volts / Amps)480V
Distribution Utility Transformer Size (kVA)TBD
Existing Other Generation Back-up Generation
Section 2: Solar Facility
Array Structure OEM TerraSmart
Installation Type(GM, SS, RM etc.)Fixed Tilt GM
Azimuth (°)180
Tilt(°)20
Minimum Clearance Height (ft)3
Solar PV Panel OEM Hanwha Qcells
Solar PV Model #QCELLS Q.PEAK DUO XL-G11S
Solar PV Panel Rating(W)595
Solar PV Panel Quantity(#)3000
Solar PV Panels Per String(#)120 Strings of 25 Modules
Solar Facility Capacity (kWSTC-DC)1,785.00
Inverter OEM Chint Power
Inverter Model #Chint SCH275KLT-DO/US-800-36 250W AC output Inverter Quantity 5
Total Inverter Capacity (kW-AC)250.00
DC/AC Ratio 7.14
AC Inverter voltage (V)800
Packet Page 853 of 1189Attachment 2 Page 101 of 159

Solar Facility Transformer Size (kVA)1500
Year 1 "Annual Production Estimate" (kWh)3,066,005
Solar PV Production Annual Degradation(%)0.5%
ear 1 Annual Production Estimate to Target "Annual Produ 0.985713686 Section 3: Battery System
Battery System Size (kWh)1,860.0
Battery System Inverter Size (kW-AC)450 (200 + 250)
Duration(hrs.)4.0
Battery OEM Socomec
Battery System Inverter OEM Socomec
Battery System Round Trip Efficiency (%)86.00%
Additional System De-rate (%)2.00%
Anticipated Annual Full Discharges (Yr. 1 #)329
Battery System Transformer Size (kVA)200 / 250
Capable of Exporting for NEM Credits(Y/N)N/A
Battery System Warranty Term(YRS)10.00
Section 4: EVCS
# of Future L1 EV Chargers Planned N/A
# of Future L2 EV Chargers Planned N/A
of Conduits Needed for Future Installation of L1 EV Charge N/A of Conduits Needed for Future Installation of L2 EV Charge N/A Section 5: System Offer Costs
Total "Development Costs" included in "Power Price"($)385,000.00$ ticipated ADA Upgrade Costs Included in "Power Price"($-$ icipated ADA Upgrade Costs Included in "Contract Sum"($-$ Site Electrical System Upgrade Costs included in "Power -$ Site Electrical System Upgrade Costs Included in "Contra -$ ed Distribution Utility Upgrade Costs included in "Power P 4,000.00$ Anticipated Distribution Utility Upgrade Costs ($)4,000.00$ ower Price" per $10,000 change in Distribution Upgrade C 0.0005$ Incentive Amount($)N/A
Incentive Program N/A
ITC Percentage(%)40%
Solar Facility Cost($)Bundled PPA Rate
Battery System Cost ($)Bundled in PPA
PPA Term(YRS)25
Solar Facility "Power Price"($/kWh)0.1175$
Solar Facility "Power Price" Annual Escalator(%)0.0%
"Battery System Services Rate"($/month)N/A
"Battery System Services Rate" Annual Escalator (%)0.0% System "Termination Value" (Yr 1 $)10,852,750$
Packet Page 854 of 1189Attachment 2 Page 102 of 159

System "Termination Value"(Yr 6 $)4,689,416$
Increase to Solar Facility "Power Price" due to XXX($/k 0.0005$ emental Cost for Solar Facility Extended Inverter Warranty N/A Incremental Cost to use all Copper Wiring($)N/A
Incremental Cost to add Backup Power Solution($)N/A
Incremental Cost to add XXXXX($)N/A
Section 6: Utility Billing (assume 0% escalation for rates) YR 0 Existing Utility Bill ($)$10,864,161
YR 0 Existing Utility Bill Demand Charges($)$423,265
YR 0 Existing Utility Bill Energy Charges($)$604,907
YR 1 Total Utility Bill($)Please reference Savings Analysis Report Utility Bill Energy Charges Post-Solar PV ($)Please reference Savings Analysis Report Utility Bill Demand Charges Post-Solar PV($)Please reference Savings Analysis Report Utility Bill Energy Charges Post-Battery System ($)Please reference Savings Analysis Report Utility Bill Demand Charges Post-Battery System($)Please reference Savings Analysis Report YR 1 Utility Bill Demand Charge Savings($)Please reference Savings Analysis Report YR 1 Utility Bill Energy Savings($)Please reference Savings Analysis Report YR 1 Total Utility Bill Savings($)Please reference Savings Analysis Report Section 7: Other Cost Savings (assume 0% escalation for rates) Demand Response Revenue (YR 1 $)Please reference Savings Analysis Report Other
Section 8: Performance Guarantee
Solar Facility "Output Guarantee Rate"(YR 1 $/kWh)0.027 Solar Facility Output Guarantee Rate(YR 1 $/kWh)0.027
lar Facility "Output Guarantee Rate" Annual Escalation(%0.0% olar Facility Output Guarantee Rate" Annual Escalation(%) Solar Facility "Output Guarantee"(YR 1 kWh)0
Solar Facility Output Guarantee(YR 1 kWh)0
"Battery System Guarantee Rate"($/hr)$53/cycle
Battery System Guarantee Rate(INSERT UNITS)$53/cycle
"Battery System Guarantee Rate" Annual Escalation(%)0.0% Battery System Guarantee Rate Annual Escalation(%)0.0%
Battery System "Guaranteed Cycles"(YR 1 #)296
Battery System Guaranteed Cycles(YR 1 #)296
Battery System "Guaranteed Cycles" Annual Change(%)See Socomec Spec Sheet for degredation curve Battery System Guaranteed Cycles Annual Change(%)See Socomec Spec Sheet for degredation curve "Battery System Guarantee"(YR 1 kWh) 1674
Battery System Guarantee Cost($)
Packet Page 855 of 1189Attachment 2 Page 103 of 159

37 ATTACHMENT C - PROJECT SCHEDULE

TO GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Packet Page 856 of 1189Attachment 2 Page 104 of 159

38 ATTACHMENT D - COMMISSIONING SCHEDULE

TO GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Packet Page 857 of 1189Attachment 2 Page 105 of 159

IDTask ModeTask NameDuration StartFinishPredecessors Successors % Complete1City of Fairfield 1785.0 kW DC Fixed-Tilt Ground Mount Milestones1695 daysThu 12/5/19Wed 6/24/260%2Award Date 0 daysWed 4/24/24Wed 4/24/24320%3Engineering Notice to Proceed 0 daysMon 4/29/24Mon 4/29/24330%450% Design Drawings due to Site Host0 daysTue 7/23/24Tue 7/23/2438,46,56,370%550% Drawings Site Host Review 0 daysTue 7/30/24Tue 7/30/2439,47,570%690% Design Drawings due to Site Host0 daysTue 8/27/24Tue 8/27/2440,48,580%790% Drawings Site Host Review 0 daysWed 9/4/24Wed 9/4/2441,49,590%8100% Design Drawings due to Site Host0 daysWed 10/2/24Wed 10/2/2442,50,600%9100% drawings Site Host Review 0 daysWed 10/9/24Wed 10/9/2443,51,610%10 IFC Stamped Drawings 0 daysWed 10/23/24Wed 10/23/2444,52,620%11Design & Engineering Completed0 daysWed 10/23/24Wed 10/23/24350%12Interconnection Sign-off with the Utility0 daysWed 3/12/25Wed 3/12/25650%13Permits AHJ Approval Completed0 daysWed 3/12/25Wed 3/12/25640%14Major Equipment Order Date 0 daysTue 6/25/24Tue 6/25/2470SS0%15Procurement Completed0 daysFri 8/22/25Fri 8/22/25700%16Site Preparatiion Start 0 daysTue 8/26/25Tue 8/26/2583SS0%17Site Preparatiion Completed0 daysTue 10/7/25Tue 10/7/25830%18Construction Start 0 daysTue 8/26/25Tue 8/26/2582SS0%19Mechanical Installation Completed0 daysTue 10/28/25Tue 10/28/25870%20Electrical Installation Completed0 daysTue 3/31/26Tue 3/31/26930%21Interconnection Sign off 0 daysTue 3/17/26Tue 3/17/261120%22PV Completion 0 daysWed 4/1/26Wed 4/1/261130%23Utility Meter and Rate Switch Submittal 0 days0%24Permission to Operate (PTO)0 daysThu 5/14/26Thu 5/14/261180%25Testing & Commissioning Completed0 daysFri 5/29/26Fri 5/29/261190%26Commercial Operation Date0 daysMon 6/1/26Mon 6/1/261230%27Commercial Operation Deadline 0 daysThu 6/1/26Thu 6/1/260%28Final Completion0 daysWed 6/24/26Wed 6/24/261320%29City of Fairfield 1785.0 kW DC Fixed-Tilt Ground Mount679 daysWed 11/8/23Wed 6/24/260%30Contract 123 daysWed 11/8/23Mon 4/29/240%31Proposal Submission 1 dayWed 11/8/23Wed 11/8/23320%32Contract Execution 105 daysThu 11/30/23Wed 4/24/24312,330%33Engineering Notice to Proceed 0 daysMon 4/29/24Mon 4/29/24323,46,55,370%34Pre-Construction340 daysMon 4/29/24Fri 8/22/250%35Design & Engineering125 daysMon 4/29/24Wed 10/23/24110%36Electrical Design125 daysMon 4/29/24Wed 10/23/24690%37Due Diligence Analysis40 daysMon 4/29/24Mon 6/24/24334,38,760%3850% Design Drawings due to Site Host20 daysTue 6/25/24Tue 7/23/243739,40%3950% Drawings Site Host Review 5 daysWed 7/24/24Tue 7/30/243840,5,630%4090% Design Drawings due to Site Host20 daysWed 7/31/24Tue 8/27/243941,60%4190% Drawings Site Host Review 5 daysWed 8/28/24Wed 9/4/244042,70%42100% Design Drawings due to Site Host20 daysThu 9/5/24Wed 10/2/244143,80%43100% drawings Site Host Review 5 daysThu 10/3/24Wed 10/9/244244,90%44 IFC Stamped Drawings 10 daysThu 10/10/24Wed 10/23/244310,65,800%45Structural Design120 daysMon 4/29/24Wed 10/16/24680%46Due Diligence Analysis40 daysMon 4/29/24Mon 6/24/243347,40%4750% Design Drawings due to Site Host20 daysTue 6/25/24Tue 7/23/244648,50%4850% Drawings Site Host Review 5 daysWed 7/24/24Tue 7/30/244749,60%4990% Design Drawings20 daysWed 7/31/24Tue 8/27/244850,70%5090% Drawings Site Host Review 5 daysWed 8/28/24Wed 9/4/244951,80%51100% Design Drawings due to Site Host20 daysThu 9/5/24Wed 10/2/245052,90%52100% drawings Site Host Review 5 daysThu 10/3/24Wed 10/9/245153,100%53 IFC Stamped Drawings 5 daysThu 10/10/24Wed 10/16/24520%54SWPPP Design120 daysMon 4/29/24Wed 10/16/24670%SMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSFeb 11, '24Feb 18, '24Feb 25, '24Mar 3, '24Mar 10, '24Mar 17, '24Mar 24, '24TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 1Project: Project ScheduleDate: Thu 3/14/24Packet Page 858 of 1189Attachment 2 Page 106 of 159

IDTask ModeTask NameDuration Start FinishPredecessors Successors % Complete55Due Diligence Analysis40 daysMon 4/29/24Mon 6/24/2433560%5650% Design Drawings due to Site Host20 daysTue 6/25/24Tue 7/23/245557,40%5750% Drawings Site Host Review 5 daysWed 7/24/24Tue 7/30/245658,50%5890% Design Drawings20 daysWed 7/31/24Tue 8/27/245759,60%5990% Drawings Site Host Review 5 daysWed 8/28/24Wed 9/4/245860,70%60100% Design Drawings due to Site Host20 daysThu 9/5/24Wed 10/2/245961,80%61100% drawings Site Host Review 5 daysThu 10/3/24Wed 10/9/246062,90%62 IFC Stamped Drawings 5 daysThu 10/10/24Wed 10/16/2461100%63Procurement & Pemiting Notice to Proceed 1 dayWed 7/31/24Wed 7/31/243971,72,73,74,75,77,78,790%64Permits & Interconnection 105 daysThu 10/17/24Wed 3/12/25130%65Utility Interconnection Application and Initial Review100 daysThu 10/24/24Wed 3/12/2544120%66AHJ Permitting and Approvals105 daysThu 10/17/24Wed 3/12/2581FS+115 days0%67SWPPP Permit 100 daysThu 10/17/24Wed 3/5/25540%68Building Permit100 daysThu 10/17/24Wed 3/5/25450%69Electrical Permit 100 daysThu 10/24/24Wed 3/12/25360%70Procurement Major Equipment Ordered (After Approved Submittal)300 daysTue 6/25/24Fri 8/22/2515,14SS0%71Solar Modules40 daysThu 8/1/24Thu 9/26/2463910%72Inverters40 daysThu 8/1/24Thu 9/26/2463950%73Racking45 daysThu 8/1/24Thu 10/3/246390,890%74AC COMBINER100 daysThu 8/1/24Thu 12/19/24631010%75PV SWITCHGEAR150 daysThu 8/1/24Thu 2/27/25631020%76SOCOMEC SUNSYS HES provided by Onyx 300 daysTue 6/25/24Fri 8/22/25371060%77PV TRANSFORMER150 daysThu 8/1/24Thu 2/27/25631030%78PV & BESS SWITCHGEAR250 daysThu 8/1/24Mon 7/21/25631050%79PV UTILITY DISCONNECT250 daysThu 8/1/24Mon 7/21/25631040%80Data MONITORING System "DAS"40 daysThu 10/24/24Wed 12/18/24440%81Construction Notice to Proceed1 dayMon 8/25/25Mon 8/25/2566FS+115 days840%82Construction155 daysTue 8/26/25Tue 3/31/26113,18SS0%83Site Preparation30 daysTue 8/26/25Tue 10/7/2517,16SS0%84SWPPP10 daysTue 8/26/25Tue 9/9/258185,880%85Fencing 10 daysWed 9/10/25Tue 9/23/2584860%86Tree Removal 10 daysWed 9/24/25Tue 10/7/2585990%87Mechanical Installation 35 daysWed 9/10/25Tue 10/28/25190%88Survey and Layout 5 daysWed 9/10/25Tue 9/16/2584890%89Install Piles15 daysWed 9/17/25Tue 10/7/2573,8890SS+5 days0%90Install Racking15 daysWed 9/24/25Tue 10/14/2573,89SS+5 days91SS+5 days0%91Install Modules10 daysWed 10/1/25Tue 10/14/2590SS+5 days,7196,920%92Mechanical QA/QC Final Inspections10 daysWed 10/15/25Tue 10/28/25910%93Electrical Installation 125 daysWed 10/8/25Tue 3/31/26200%94DC Equipment 25 daysWed 11/12/25Tue 12/16/25970%95Inverter 10 daysWed 11/12/25Tue 11/25/2572,100960%96DC Wiring Modules to Inverters 15 daysWed 11/26/25Tue 12/16/2595,910%97Electrical QA/QC Final Inspections10 daysWed 3/18/26Tue 3/31/2698,940%98AC Equiqment 115 daysWed 10/8/25Tue 3/17/26970%99Boring Trenching Underground Conduit 15 daysWed 10/8/25Tue 10/28/25861000%100Equitment Pad & Racks & Bollards10 daysWed 10/29/25Tue 11/11/2599101,950%101AC COMBINER7 daysWed 11/12/25Thu 11/20/2574,1001020%102PV SWITCHGEAR7 daysFri 11/21/25Mon 12/1/2575,1011030%103PV TRANSFORMER7 daysTue 12/2/25Wed 12/10/2577,1021040%104PV UTILITY DISCONNECT7 daysThu 12/11/25Fri 12/19/2579,1031050%105PV & BESS SWITCHGEAR7 daysMon 12/22/25Tue 12/30/2578,1041060%106SOCOMEC SUNSYS HES 10 daysWed 12/31/25Tue 1/13/2676,1051070%107AC Wiring Installation 10 daysWed 1/14/26Tue 1/27/261061080%108MV Wire Installation 10 daysWed 1/28/26Tue 2/10/261071090%SMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSFeb 11, '24Feb 18, '24Feb 25, '24Mar 3, '24Mar 10, '24Mar 17, '24Mar 24, '24TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 2Project: Project ScheduleDate: Thu 3/14/24Packet Page 859 of 1189Attachment 2 Page 107 of 159

IDTask ModeTask NameDuration Start FinishPredecessors Successors % Complete109BESS Wire Installation 7 daysWed 2/11/26Thu 2/19/261081100%110DAS equipment10 daysFri 2/20/26Thu 3/5/261091110%111DAS Wiring 7 daysFri 3/6/26Mon 3/16/261101120%112INTERCONNECTION1 dayTue 3/17/26Tue 3/17/26111210%113PV Mechanical Completion 1 dayWed 4/1/26Wed 4/1/268222,115,1160%114AHJ & Utility Inspections30 daysThu 4/2/26Wed 5/13/261180%115Building Inspection10 daysThu 4/2/26Wed 4/15/261130%116Electrical Inspection10 daysThu 4/2/26Wed 4/15/261131170%117Utility Inspection20 daysThu 4/16/26Wed 5/13/261160%118Permission to Operate (PTO)1 dayThu 5/14/26Thu 5/14/2611424,120,121,1220%119Testing & Commissioning 10 daysFri 5/15/26Fri 5/29/26126,25,1230%120DC Commissioning 10 daysFri 5/15/26Fri 5/29/261180%121AC Gear Commissioning 10 daysFri 5/15/26Fri 5/29/261180%122DAS Commissioning10 daysFri 5/15/26Fri 5/29/261180%123Commercial Operation Date1 dayMon 6/1/26Mon 6/1/26119260%124Commercial Operation Deadline 0%125Post-Construction (Close Out) 17 daysMon 6/1/26Tue 6/23/261320%126Project Walkthrough/ Punchlist2 daysMon 6/1/26Tue 6/2/26119127,128,129,130,1310%127Prepare As Built Plans15 daysWed 6/3/26Tue 6/23/261260%128Deliver O&M Manuals 15 daysWed 6/3/26Tue 6/23/261260%129Owner/Operator Training15 daysWed 6/3/26Tue 6/23/261260%130Punch List Signoff15 daysWed 6/3/26Tue 6/23/261260%131Deliver Final Submittals15 daysWed 6/3/26Tue 6/23/261260%132Final Completion1 dayWed 6/24/26Wed 6/24/26125280%SMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSFeb 11, '24Feb 18, '24Feb 25, '24Mar 3, '24Mar 10, '24Mar 17, '24Mar 24, '24TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 3Project: Project ScheduleDate: Thu 3/14/24Packet Page 860 of 1189Attachment 2 Page 108 of 159

39 ATTACHMENT E – OPERATIONAL OBJECTIVES

TO GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Solar Facility Sizing
If Solar Facilities are part of the project scope, it is the responsibility of the Installer to ensure that the sizing of the total installed system capacity at each Site (kWDC / kWAC) achieves the Annual Energy Production Target as defined in the Site Assessment Table as closely as practical for each Site and the Operational Objectives. The total installed system capacity per Site shall not increase or decrease the Annual Production Estimate without prior written approval of Site Host.

Battery System Sizing
If a Battery System is part of the project scope, it is the responsibility of the Installer to ensure that the sizing of the total installed system capacity (kW and kWh) per Site meets and the Operational Objectives.

Battery Systems Operation

1. Battery Systems shall charge one hundred percent (100%) from the Solar Facility.

2. Battery Systems shall prioritize operations in the following order:
a. Demand Reduction
b. Maximize savings from energy arbitrage
c. Maximize revenue from Grid Services Programs

NEM2 Interconnection Agreement
Installer is responsible to complete the Project within the requirements of the NEM2 interconnection applications and agreements with the Distribution Utility including addressing any and all notices of deficiencies and applying for new or revising the NEM2 interconnection agreement for addition of Battery Systems.

Packet Page 861 of 1189Attachment 2 Page 109 of 159

40 ATTACHMENT F – MAJOR EQUIPMENT

TO GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS

Packet Page 862 of 1189Attachment 2 Page 110 of 159

DAS System Hardware
Overview
AlsoEnergy wants to make it as easy as possible for you to plan and install your monitoring system hardware. That’s why we provide your core hardware devices conveniently mounted and pre-wired in a weatherproof enclosure.

DAS Assembly
• Complete with all necessary DAS
system hardware
• Preconfi gured for plug-and-play
capability with the PowerTrack
Platform
• Hardware mounted and pre-wired
• NEMA 4 rated enclosures for exterior
mounting
• Indoor mounting hardware included
• Built to your specifi cations
• ETL listed
End-to-end DAS systems from AlsoEnergy
are tested, confi gured, assembled, and wired
in our ETL listed facility in Boulder, CO.

Packet Page 863 of 1189Attachment 2 Page 111 of 159

Hardware Components
AlsoEnergy Data Logger
Pre-confi gured for use with PowerTrack
Accepts data from RS-485, RS-232, or
Ethernet connected devices.

Includes internal storage capacity and a
touch screen LCD display.

Energy Meter
Get revenue grade accuracy,
as required by many clients.

Accepts single phase, split phase, and
three phase loads.

Includes LCD display.

Weather Stations and Environmental Sensors
Our high quality weather stations can accommodate any solar or wind metric requirements.

Weather stations can fi t into the main monitoring communications enclosure or have their own dedicated enclosure.
• Anemometers
• Pyranometers (Hukseflux, Apogee,
Kipp and Zonen)
• Ambient temperature sensors
• Module Temperatures Sensors
• Basic and full weather station packages
• High temperature weather stations
• Remote and portable stations
Cellular Modem
• 4G network
• Low power consumption
• Remote management and confi guration
• Works with most major North American cellular providers Wireless Communications
• Ethernet radio
• Suitable for outdoor mounting
• Intra site communication
• Integrated antenna
• Remote oversight
Packet Page 864 of 1189Attachment 2 Page 112 of 159

Datasheet
CHINT POWER SYSTEMS AMERICA 2023/05-MKT NA Chint Power Systems America 1380 Presidential Drive, Suite 100, Richardson, TX 75081Tel: 855-584-7168 Mail: [email protected] Web: www.chintpowersystems.com 800 Vac 3:1 AC Combiner Solution for CPS Inverters
Internal View of AC Combiner Box
The CPS 800 Vac 3:1 AC Combiner Box is designed for CPS 250/275 kW three-phase string inverters to optimize system design, installation, and wire management. The units combine the output of (3) CPS 250/275 kW inverters allowing a cost-effective solution for simplifying system designs and minimizing AC wire losses. This solution enables savings on labor and material costs by reducing the amount of wires needed to connect CPS string inverters to the grid.

Solutions Supplier
CPS can supply inverter and BOS equipment for 1500 V applications, which enables advantages for project logistics, shipment, and warranty management.

Decreased Wiring Costs
Combining CPS inverters with an AC Combiner Box reduces the amount of wires needed to connect the PV system to the grid.

Optimized Design
The AC Combiner Box is designed specifically for use with CPS 250/275 kW inverters.

Packet Page 865 of 1189Attachment 2 Page 113 of 159

Technical Data
Model Name
Number of input circuits
OCPD type
Disconnect
Compatible inverter(s)
Rated voltage
Rated input current
Input conductor size
Input conduit knockout size
Rated output current
Output conductor size
Output conduit knockout size
Interrupting capacity
Disconnect rating
Output fuse rating
Dimensions (H x W x D)
Weight
Padlockable enclosure (LOTO)
Grounding busbar
Breather vent
Enclosure protection degree
Operating temperature range
Operating humidity
Operating altitude
Certifications and standards
Standard
CPS DPA03-800V/US
Yes
Warranty
2 years
UL 1741, CSA C22.2 NO.107.1-16
Removable bottom plate
Safety
Environment
0% to 95%, non-condensing
8202 ft / 2500 m (no derating)
NEMA Type 3R
-22°F to +140°F / - 30°C to +60°C (derating from +104°F / +40°C) 600 A
Removable bottom plate
Yes
Mechanical
Output Parameters
Input Parameters
3 264 lbs / 120 kg
Yes
CPS SCH275KTL-DO/US-800
300-500 kcmil CU/AL (1 or 2 sets)
55 x 36.2 x 14.75 in (1400 x 920 x 375 mm)
1000 A
65 kA
800 Vac
600 A
Fuse
Yes
600-750 kcmil CU/AL (up to 4 sets)
800 A
Packet Page 866 of 1189Attachment 2 Page 114 of 159

Datasheet
CHINT POWER SYSTEMS AMERICA 2023/01-MKT NA Chint Power Systems America 1380 Presidential Drive, Suite 100, Richardson, TX 75081Tel: 855-584-7168 Mail: [email protected] Web: www.chintpowersystems.com In-Line Cluster Mounting Bracket
The CPS In-Line Cluster Mounting Bracket is designed to provide a simple, low-cost mounting solution for CPS 250/275 kW inverters and CPS 800 Vac 3:1 AC Combiners. (3) CPS 250/275 kW and (1) 800 Vac AC Combiner can be mounted onto piles to easily install the equipment for ground mount PV applications. This solution enables savings on labor and material costs for system designs and installation.

Key Features
CPS In-Line Cluster Mounting Bracket
Designed for CPS 250/275 kW Inverters & 800 Vac AC Combiners Easily mount (3) 250/275 kW inverters and (1) 800 Vac AC Combiner Simplifies Inverter and Combiner installation
Cost-efficient mounting solution
Includes mounting bracket for CPS 800 Vac AC Combiner
In-line design to allow efficient working space
Packet Page 867 of 1189Attachment 2 Page 115 of 159

Technical Data
Cluster Components
Item No.Component Name Quantity
1 Equipment installation vertical beam 8
2 Beam 4
3 Vertical beam 6
4 Pile connector 3
5 Pile 3 (user supplied)
Model Name
Material
Dimensions (H x W x D)
Dimensions of total Cluster Mounting Bracket including
(3) 250/275 kW Inverters + (1) 800 Vac AC Combiner
Total weight of Cluster Rack
Compatible inverters
Compatible combiner
Installation method
Standard
CPS In-Line Cluster Mounting Bracket
Mounted to 3 piles (piles not included)
Warranty
2 years
CPS DPA03-800V/US
Mechanical
264 lbs / 120 kg
CPS SCH275KTL-DO/US-800
DC51D-ZM180 steel

46.3 x 231.4 x 6.8 in (1,175 x 5,877 x 172 mm)

55.1 x 231.4 x 23.3 in (1,400 x 5,877 x 643 mm)
Packet Page 868 of 1189Attachment 2 Page 116 of 159

250/275kW V2, 1500Vdc String Inverters for North America Datasheet
CPS SCH275KTL-DO/US-800 V2
The 250/275kW high power CPS three phase string inverters are designed for ground mount applications. The units are high performance, advanced and reliable inverters designed specifically for the North American environment and grid.

High efficiencies, wide operating voltages, broad temperature ranges and NEMA Type 4X enclosure enable this inverter platform to operate at high performance across many applications. The SCH275KTL inverters include a selectable Active Power of either 250kW or 275kW (factory default) with 12 MPPTs and are available with either 36 fused PV string inputs or 24 unfused PV string inputs. The CPS FlexOM solution enables communication, controls and remote product upgrades.

Key Features
CHINT POWER SYSTEMS AMERICA 2023/10-MKT NA Chint Power Systems America1380 Presidential Drive, Suite 100, Richardson, TX 7508Tel: 855-584-7168 Mail: [email protected] Web: www.chintpowersystems.com ◼Anti-PID function◼Reactive Power at Night function◼CPS FlexOM Gateway enables remote FW upgrades◼Integrated DC disconnect switches◼Protection functions for enhanced reliability and safety◼Selectable Max AC Active Power of 250kW or 275kW◼UL 1741-SA certified to CA Rule 21, including SA14-18 ◼12 MPPTs with 36 fused inputs or 24 unfused inputs ◼Copper and Aluminum compatible AC connections◼NEMA Type 4X outdoor rated, tough tested enclosure◼Full power capacity up to 42°C◼Standard 5 year warranty with extensions to 20 years◼Supported comm protocols (Modbus RTU, TCP/IP, PLC, CAN)◼UL 1741-SB and IEEE 1547-2018 certified Packet Page 869 of 1189Attachment 2 Page 117 of 159

Model Name CPS SCH275KTL-DO/US-800-36 V2 CPS SCH275KTL-DO/US-800-24 V2 Max. DC Input Voltage
Operating DC Input Voltage Range
Start-up DC Input Voltage / Power
MPPT Voltage Range @ PF>0.991
Number of MPP Trackers 12 12
Max. PV Input Current 30A per MPPT 30A per MPPT
Max. PV Short-Circuit Current 600A, 50A per MPPT 600A, 50A per MPPT Number of DC Inputs 36 Fused Inputs, 3 per MPPT 24 Non-Fused Inputs DC Disconnection Type
DC Surge Protection
Max AC Output Power (Selectable) @ PF>0.99
Max. AC Apparent Power
Rated Output Voltage
Output Voltage Range 2
Grid Connection Type
Max. AC Output Current @800Vac
Rated Output Frequency
Output Frequency Range 2
Power Factor
Current THD @ Rated Load
Max. Fault Current Contribution (1 Cycle RMS)
Max. OCPD Rating
AC Surge Protection
Max. Efficiency
CEC Efficiency
Stand-by / Night Consumption
Enclosure Protection Degree
Cooling Method
Operating Temperature Range 3
Operating Humidity
Operating Altitude
Audible Noise
User Interface and Display
Inverter Monitoring
Site Level Monitoring
Modbus Data Mapping
Remote Diagnostics / FW Upgrade Functions
Dimensions (HxWxD)
Weight
Mounting / Installation Angle
AC Termination
DC Termination
Fused String Inputs (3 per MPPT)6
Certifications and Standards
Selectable Grid Standard
Smart-Grid Features
Reactive Power at Night
Anti-PID function
Insulation Resistance Monitoring
Onboard Fault Oscillography
PV MPPT Current Monitoring
Residual Current Monitoring
Output Overcurrent Protection
Output Short-Circuit Protection
Output Overvoltage Protection
Standard
Extended Terms
1) See user manual for further information regarding MPPT Voltage Range when operating at non-unity PF 2) The "Output Voltage Range" and "Output Frequency Range" may differ according to the specific grid standard. 3) See user manual for further requirements regarding non-operating conditions. 4)CPS AC-PLC Kit required for AC PLC communication.

Approx. 262lbs / 119kg
Type II
Environment
System and Performance

98.5%
5W

99.0%
0 to 100%
8202ft / 2500m (no derating)
CPS FlexOM (1 per 32 inverters)
NEMA Type 4X
Modbus RS485 / PLC4 / CAN
Variable speed cooling fans
-22°F to +140°F / -30°C to +60°C (derating from +107°F / +42°C) Display and Communication
25A fuses provided (Fuse values up to 30A acceptable)
SunSpec / CPS
Standard / (with FlexOM Gateway)
10, 15 and 20 years
Warranty
Volt-RideThru, Freq-RideThru, Ramp-Rate, Specified-PF, Volt-Var, Freq-Watt, Volt-Watt 5 Years
UL1741-SA/SB Ed. 3, CSA-22.2 NO.107.1-16, IEEE1547a-2014, IEEE1547-2018, FCC PART15 IEEE 1547a-2014, IEEE 1547-2018, CA Rule 21, ISO-NE

27.2 x 41.3 x 15.7in (690 x 1050 x 400mm)
Vertical installation
Safety
Stud Type Terminal (Wire range: 4/0AWG – 750kcmil AL/CU, lugs not supplied) 36 Fused Input: Screw Clamp Fuse Holder (Wire range: #14 - #8 AWG CU) 24 Non-Fused Input: Screw Clamp Terminal (Wire range: #14 - #8 and #6 - #4 AWG CU)5 Mechanical
Yes
LED indicators, WiFi + APP

0.99 (±0.8 adjustable)
57 - 63Hz
60Hz
250kW / 275kW
275kVA
198.5A
AC Output
DC Input
500-1450Vdc
1500V
550Vdc / 500W
Load-rated DC switches
900-1300Vdc
Type II
Protection Functions
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Technical Data
5) One threaded hole per MPPT for connecting #6 - #4 AWG CU 6) Fused string inputs only applicable to the SCH275KTL 36-input model.

Packet Page 870 of 1189Attachment 2 Page 118 of 159

Packet Page 871 of 1189Attachment 2 Page 119 of 159

Packet Page 872 of 1189Attachment 2 Page 120 of 159

1. Table of Contents

3.1 3.2

3.3 5.1

5.2 5.3

6.1 6.1.a

6.1.b

6.1.c

6.2 6.2.a

6.2.b

6.2.c

6.2.d

6.2.e

6.2.f

6.2.g

6.2.h

6.2.i

6.2.j

6.3 Packet Page 873 of 1189Attachment 2 Page 121 of 159

1: Introduction
Packet Page 874 of 1189Attachment 2 Page 122 of 159

Section 2: Design Codes & Standards









Standards:




Other Requirements:







Packet Page 875 of 1189Attachment 2 Page 123 of 159

3: Site Information

3.1 Site Information for All Projects
• Arc Flash hazard Analysis and labels for all DC and AC equipment in the PV System above 50 volts
• Load flow calculations required when interconnection to non-linear bussing with a breaker. These will also be required on any interconnection when either the sum of existing breakers or sum of existing breakers + amperage from PV System equal or exceed the rating of the bussing.
• Coordination Study for any Site that requires medium voltage gear or POCC, for system sizes of 1 MW AC and larger, “campus” type settings, multiple interconnections for a single host, “critical” load at site (data center, hospital, prison, water treatment facility, etc.), and any site that will make use of settings for protection devices, or modify/replace any programmable protection devices in the existing facility equipment.
• Site Photos and other Site Specific Information upon request.

3.2 Site Information for Rooftop Projects
•
•
•
•
Packet Page 876 of 1189Attachment 2 Page 124 of 159

3.3 Site Information for Ground Mount Projects
•
•
•
•
•
•

3.4 Site Information for Canopy Mount Projects
•
•
•
•
•

Packet Page 877 of 1189Attachment 2 Page 125 of 159

Geotechnical Report Requirements for Ground & Canopy Projects used, the Geotechnical Engineer of Record must state
in writing that the report is applicable
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

Packet Page 878 of 1189Attachment 2 Page 126 of 159

3.5 Site Information for Landfill Projects
•
•
•
•
•
•
•
•
Packet Page 879 of 1189Attachment 2 Page 127 of 159

Section 4: Drawing Requirements
•
•
•
•
•
•
•
•
•
•

•
o
o
o
Packet Page 880 of 1189Attachment 2 Page 128 of 159

o
•
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Packet Page 881 of 1189Attachment 2 Page 129 of 159

o
o
o
o
o
o
o
o
•
•
•
•
•
•
•
•

Packet Page 882 of 1189Attachment 2 Page 130 of 159

5: Design & Engineering Review

5.1 Design Mobilization
•
o
o
o
o
o
o
o
o
o
•

5.2 Design Review
•
•
•
•
Packet Page 883 of 1189Attachment 2 Page 131 of 159

•
•
•

5.3 Construction/Term-Out
•
•
o
o
o
o
•

Packet Page 884 of 1189Attachment 2 Page 132 of 159

6: Design Standards

6.1 Module Layout

6.1.a – Existing Site Features
•
•
•
•
•

6.1.b – Define Useable PV space
•
•
o
o
o
o
o
o
Packet Page 885 of 1189Attachment 2 Page 133 of 159

o
o
•
o
o
o
o
o

6.1.c – Module Array Design
•
•
•
•
•
•
•
Packet Page 886 of 1189Attachment 2 Page 134 of 159

6.2 Electrical Requirements

6.2.a – General Specifications
•
•
•
•
o
▪
o
•
o
o
•
•
•
o
•
o
•
o
Packet Page 887 of 1189Attachment 2 Page 135 of 159

•
•
•
•
•

6.2.b – Inverter Sizing
•
•
•
•
o
o
o
•
o
o
•
•
•

6.2.c – Equipment Selection
•
•
Packet Page 888 of 1189Attachment 2 Page 136 of 159

•
•
•

6.2.d – Equipment Locations
•
Provide working space permitting at least 90° opening of all hinged doors.

Comply with NEC 110.26(C)
•

•
o
o
o
o
o
•
o
o
o
•
•
•
o
Packet Page 889 of 1189Attachment 2 Page 137 of 159

•
•
o

6.2.e – Grounding, (all system types as required)
•
•
•
•
•
•
•
o
•
•
•
•
•
•
Packet Page 890 of 1189Attachment 2 Page 138 of 159

.

6.2.f – Disconnecting Means
•
o
o
o
o
•
•
•
•

6.2.g – Interconnection
•
•
•
•
•
•
•
o
o
▪
▪
Packet Page 891 of 1189Attachment 2 Page 139 of 159

▪
▪
▪
▪
▪
o
•
o
o
o
o
o
o
o
o
o
o
Packet Page 892 of 1189Attachment 2 Page 140 of 159

6.2.h – Metering/Monitoring
•
•
•
•
•
o
•
•
•
•
•
•

•

6.2.i – Labels & Markings
Packet Page 893 of 1189Attachment 2 Page 141 of 159

•
•
o
o
o
•
•
•
•
•

6.2.j – Wiring
•
•
o
o
•
•
•
•
o
o
Packet Page 894 of 1189Attachment 2 Page 142 of 159

o
•
o
•
•
•
•
•
•
•
•
o
•
•
o
▪
▪
▪
▪
▪
•
•
Packet Page 895 of 1189Attachment 2 Page 143 of 159

•
o
▪
•
▪
▪
▪
▪
o
o
o
•
•
•
•
•
•
o
o
o
•
•
Packet Page 896 of 1189Attachment 2 Page 144 of 159

•
•
•
o
•
•

6.2.k – Medium Voltage
•
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
•
•
•
•
•
Packet Page 897 of 1189Attachment 2 Page 145 of 159

•
•
•
•
•
•
•
•
•
•

6.2.l – Electrical Requirements for Landfills
•
•
•
•

6.2.m – Electrical Calculations
•
•
Packet Page 898 of 1189Attachment 2 Page 146 of 159

6.3 Structural
•
o
o
o
o
o
o
o
o
o
•
•
•
•
•
o
o
•
•
o
Packet Page 899 of 1189Attachment 2 Page 147 of 159

o
o
o
o
•
•
•

6.3.a – Structural Calculation Packages
•
o
o
o
o
o
o
o
o
o
o
Packet Page 900 of 1189Attachment 2 Page 148 of 159

Section 7: Equipment Specifications
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Packet Page 901 of 1189Attachment 2 Page 149 of 159

Section 8: Glossary of Terms

Packet Page 902 of 1189Attachment 2 Page 150 of 159

Packet Page 903 of 1189Attachment 2 Page 151 of 159

Packet Page 904 of 1189Attachment 2 Page 152 of 159

www.terrasmart.com | [email protected]
Benefits
·Less hardware for faster installation and reduced
labor hours
·Simplified hardware featuring 2-piece bolt stacks and
only two types of hardware
·Adapts to steep slopes
·Foundations for any terrain
·Included wire management
Module orientation Portrait or Landscape
Module mounting Bottom mount / Integrated electrical bonding Tilt angle 5°- 35°
Wire management Incorporated in structure – NEC compliant Configuration Portrait: up to 3 high x 12 wide / Landscape: up to 4 high x 6 wide Slopes East or West facing, up to 30% / North or South facing, up to 36% Load capacities Project specific: up to 170 MPH wind speed and 100 PSF ground snow load Foundations Ground screws / Driven piles
Warranty 20 year limited warranty
Certifications UL2703, edition 1; CPP wind tunnel tested Portrait up to 3 high x 12 wide Landscape up to 4 high x 6 wide Bifacial compatible
Specifications
GLIDE Agile
Our adjustable and durable frame features less hardware, integrated electrical bonding, and included wire management resulting in reduced labor hours. Installation times are shortened by up to 36% through simplified connections, agile parts, and seasoned field teams. Foundation consultation from an unbiased partner, based on your unique project site. No matter the terrain or weather, we’ll provide the right solution. Our versatile design enables numerous configurations allowing us to meet your unique needs and bring solar to more fields.
·Lighter, stiffer components for less freight costs
·Versatile with numerous configurations
·Durable, tolerating up to 170 MPH winds and 100 PSF
ground snow loads
·Landscape orientation is bifacial compatible to maximize potential backside power yield
Packet Page 905 of 1189Attachment 2 Page 153 of 159

Q.PEAK DUO XL-G11S.3 / BFG
Q.PEAK DUO XL-G11S
SERIES
MODEL
585-600 Wp | 156 Cells

21.5 % Maximum Module Efficiency

TOP BRAND PV

MODULES
USA
2022
The ideal solution for:

Ground-mounted
solar power plants
1 See data sheet on rear for further information.
² APT test conditions according to IEC / TS 62804-1:2015 method B (−1500 V, 168 h) including post treatment according to IEC 61215-1-1 Ed. 2.0 (CD) High-tech aluminum alloy frame protects from damage,
enables use of a wide range of mounting structures and is certified regarding IEC for high snow (5400 Pa) and wind loads (2400 Pa).

Frame for versatile mounting options
Q.ANTUM DUO technology with optimized module layout to
boost module power and improve LCOE.

Low electricity generation costs
Double glass module design enables extended lifetime with 12-year product warranty and improved 30-year performance warranty1.

A reliable investment
Innovative all-weather technology
Optimal yields, whatever the weather with
excellent low-light and temperature behavior.

Bifacial Q.ANTUM solar cells make efficient use of light shining on the module rear-side for radically improved LCOE.

Bifacial energy yield gain of up to 21 %
Long-term yield security with Anti LID and Anti PID
Technology2, Hot-Spot Protect.

Enduring high performance
Packet Page 906 of 1189Attachment 2 Page 154 of 159

Mechanical Specification

44.6"(1134 mm)

55.1" (1400 mm)

96.9" (2462 mm)

1.38" (35 mm)
4 × Mounting slots (DETAIL A)
Frame

43.0"
(1092 mm)
NA
Label
4 × Grounding holes,Ø 0.18" (4.5 mm)

15.7" (400 mm)
8 × Mounting slots system Tracker (DETAIL B)
DETAIL A 0.63" (16 mm)

0.33" (8.5 mm)0.83" (21 mm)
DETAIL B 0.39" (10 mm)

0.28" (7 mm)0.87" (22 mm)

42.9"
(1090 mm)

31.1" (790 mm)

13.8" (350 mm)

29.5" (750 mm)

20.9" (531mm)
8 × Drainage holes0.12 × 0.24" (3 × 6 mm)
Tracker slot Mounting
slots
Format 96.9 in × 44.6 in × 1.38 in (including frame)
(2462 mm × 1134 mm × 35 mm)
Weight 76.9 lbs (34.9kg)
Front Cover 0.08 in (2.0 mm) thermally pre-stressed glass with anti-reflection technology
Back Cover 0.08 in (2.0 mm) semi-tempered glass
Frame Anodised aluminium
Cell 6 × 26 monocrystalline Q.ANTUM solar half cells
Junction box 2.09-3.98 × 1.26-2.36 × 0.59-0.71 in (53-101 mm × 32-60 mm × 15-18 mm), Protection class IP67, with bypass diodes
Cable 4 mm² Solar cable; (+) ≥ 29.5 in (750 mm), (−) ≥ 13.8 in (350 mm) Connector Stäubli MC4; Stäubli MC4-Evo2; - IP68
Q.PEAK DUO XL-G11S SERIES
Qcells pursues minimizing paper output in consideration of the global environment.

Note: Installation instructions must be followed. Contact our technical service for further information on approved installation of this product.

Hanwha Q CELLS America Inc. 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL [email protected] | WEB www.qcells.com Contact your Qcells Sales Representative for details regarding the module’s eligibility to be Buy American Act (BAA) compliant.Specifications subject to technical changes © Qcells Q.PEAK_DUO_XL-G11S-BFG_series_585-600_2023-07_Rev05_NAProperties for System Design Maximum System Voltage VSYS [V]1500 PV module classification Class II Maximum Series Fuse Rating [A DC]30 Fire Rating based on ANSI / UL 61730 TYPE 294 Max. Design Load, Push / Pull3 [lbs / ft2]75 (3600 Pa) / 33 (1600 Pa)Permitted Module Temperature on Continuous Duty
−40 °F up to +185 °F
(−40 °C up to +85 °C)Max. Test Load, Push / Pull3 [lbs / ft2]113 (5400 Pa) / 50 (2400 Pa) 3 See Installation Manual 4 New Type is similar to Type 3 but with metallic frame UL 61730, CE-compliant,
IEC 61215:2016,
IEC 61730:2016,
U.S. Patent No. 9,893,215
(solar cells)
Qualifications and Certificates
Electrical Characteristics

TEMPERATURE COEFFICIENTS
Temperature Coefficient of ISC α [% / K]+0.04 Temperature Coefficient of VOC β [% / K]−0.27 Temperature Coefficient of PMPP γ [% / K]−0.34 Nominal Module Operating Temperature NMOT [°F]108 ± 5.4 (42   ± 3 °C)
POWER CLASS 585 590 595 600
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W) BSTC*BSTC*BSTC*BSTC*MinimumPower at MPP1 PMPP [W]585 639.9 590 645.4 595 650.8 600 656.3 Short Circuit Current1 ISC [A]13.72 15.01 13.74 15.04 13.77 15.07 13.80 15.10 Open Circuit Voltage1 VOC [V]53.57 53.76 53.60 53.79 53.63 53.82 53.66 53.85 Current at MPP IMPP [A]13.07 14.30 13.12 14.36 13.17 14.41 13.22 14.46 Voltage at MPP VMPP [V]44.75 44.74 44.96 44.95 45.18 45.17 45.39 45.38 Efficiency1 η [%]≥ 21.0 ≥ 21.1 ≥ 21.3 ≥ 21.5
Bifaciality of PMPP and ISC 70 % ± 5 % • Bifaciality given for rear side irradiation on top of STC (front side) • According to IEC 60904-1-2 1 Measurement tolerances PMPP ± 3 %; ISC, VOC ± 5 % at STC: 1000 W/m²; *at BSTC: 1000 W/m² + φ × 135 W/m², φ = 70 % ± 5 %, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 MinimumPower at MPP PMPP [W]440.5 444.2 448.0 451.8
Short Circuit Current ISC [A]11.05 11.07 11.09 11.11
Open Circuit Voltage VOC [V]50.67 50.69 50.72 50.75
Current at MPP IMPP [A]10.30 10.34 10.38 10.42
Voltage at MPP VMPP [V]42.79 42.97 43.15 43.34
1Measurement tolerances PMPP ± 3 %; ISC; VOC ± 5 % at STC: 1000 W/m2, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 • ²800 W/m2, NMOT, spectrum AM 1.5 200 400 600 800 1000
90 100
80 110
10 30251520005

84.95 98
95 80
100
RELATIVE EFFCIENCY [%]Qcells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power
during first year. Thereafter max.

0.45 % degradation per year. At
least 93.95 % of nominal power
up to 10 years. At least 84.95 % of
nominal power up to 30 years.

All data within measurement
tolerances. Full warranties in
accordance with the warranty
terms of the Qcells sales
organisation of your respective
country.

Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m2).RELATIVE EFFCIENCYCOMPARED TO NOMINAL POWER [%]YEARS IRRADIANCE [W/m²] Qcells
Industry standard of p-mono*
*Standard terms of guarantee for the 5 PV companies with the highest production capacity in 2021 (February 2021)
Packet Page 907 of 1189Attachment 2 Page 155 of 159

SUNSYS HES L©
Modular outdoor Energy Storage System
from 50 kVA / 186 kWh to 550 kVA / 1116 kWh systems
Safety certified
The system combines 2 top quality
components to deliver a winning formula.

CATL EnerOne Liquid-Cooled Battery:
the SUNSYS B-Cab L uses stable Lithium
Iron Phosphate (LFP) battery chemistry. The
battery has passed the large-scale fire test
UL9540A.

Socomec Power Conversion System (PCS):
the SUNSYS C-Cab L uses a safe conversion
technology to limit the common mode noise effect.

SUNSYS HES L is compliant with UL9540-2020:
the latest and most stringent safety standard
for Energy Storage Systems, in both Canada
and the USA.

Extreme flexibility
The SUNSYS HES L system is based on
2 standard cabinets – C-Cab and B-Cab –
that can be combined to make dozens of
certified combinations.

In addition, the installation can be upgraded with:
- increased power with the addition of one or
more 50 kVA power modules in the C-Cab
or even additional C-Cabs,
- increased energy with the addition of B-Cabs.

Fast and error-free installation
Battery cabinets are shipped completely
assembled with internal modules mounted –
for maximum quality with the minimum
transportation costs and installation time.

Also, for an error-free installation:
- drilling plates are provided to prepare the
locations of the drillings,
- the intelligence (PMS, BMS & EMS) is
integrated inside the C-Cab to reduce
complexity,
- DC connecting kits are available to
simplify the connection between the
converters and batteries.

Easy maintenance
Reduced maintenance with HVAC replaced
by air filters that can easily be maintained by
the customer.

Seamless service during maintenance
as one C-Cab L module can be changed
without interruption whilst keeping the others
operational.

Furthermore, one battery rack can be
disconnected for module replacement
keeping the others operational.

SUNSYS HES L is an outdoor system that merges proven individual technologies to create a more efficient all-in-one solution. Partnering with CATL, Socomec has selected the EnerOne liquid cooled LFP battery system as the optimum battery for SUNSYS Hybrid Energy Storage.

SUNSYS HES L meets the most stringent safety standards.

The range is available in a variety of sizes and can work both as grid follower and grid-former. sunsy_311.eps >Commercial and industrial
buildings
>EV charging infrastructure
>Isolated microgrids
>Resilient microgrids
>Renewable energy integration:

Solar and Storage
The solution for
>Safety certified
>Extreme flexibility
>Fast and error-free installation
>Easy maintenance
>Maximum savings and fast ROI
Strong points
>For larger installations,
please consider our larger
energy storage range,
SUNSYS HES XL range
Multi-MWh systems
Socomec Expert Services teams in North America provide:
>Extended warranties, for up to 20 Years
>Scheduled preventive maintenance for warranty compliance >On-site startup and commissioning
>Prompt service response in the unlikely event unscheduled service may be required Expert Services
>Safety: UL 9540-2020;
UL 9540A
>EMC: FCC part 15 Level A
>Environment: RoHS; REACH
>Communication protocol:

Modbus TCP; SunSpec 2.0
>Grid code: UL 1741 SA/SB;
UL 1741 CRD; IEEE 1547-
2018; IEEE 1547.1-2020; CA
Rule 21
Please consult us for additional ones.

Conformity to standardsSUNSYS HES L2 Catalogue
Packet Page 908 of 1189Attachment 2 Page 156 of 159

Suitable for all of the following applications
Commercial and industrial buildingssunsys_333_a_en.aiResilient microgridsunsys_334_a_en.aiElectric vehicle charging infrastructuresunsys_335_a_en.aiRenewable energy integrationsunsys_331_a_en.aiIsolated microgridsunsys_332_a_en.aiEase of operation & maximum savings Energy toolbase EMS
Integrated inside our C-Cab, this intelligent EMS will manage your system to enable maximized savings.

This Energy Management System includes:
•Acumen EMS: controls software that forecasts and optimally discharge the ESS in the field.
•ETB Monitor: a monitoring software providing real-time insights into the operational performance and savings of your system.

Who is Energy Toolbase?
ETB is backed by Pason Systems, a highly reputable, bankable, 40 year-old company.

Their team and suite of products takes you through every step of a project’s lifecycle – from project conception to end of life appli_1038_a.psdSUNSYS HES L© Modular outdoor Energy Storage System
from 50 kVA / 186 kWh to 550 kVA / 1116 kWh systems
3Catalogue
Packet Page 909 of 1189Attachment 2 Page 157 of 159

Energy (kWh)
Power (kVA)
1 B-Cab
186
2 B-Cab
372
3 B-Cab
558
4 B-Cab
744
5 B-Cab
930
6 B-Cab
1116
50 100
150
200
250
300
350
400
450
500
550
Popular Configurations, featured in ETB Developer. Available configurations.

Many system configurations are available to meet customer requirements sunsy_313.epssunsy_315.eps+ 2280 kg / 5027 lbsUp to 1005 kg / 2216 lbs
2 modular units for maximum flexibility
>Bidirectional power converter
>50 to 300 kVA / cabinet
>Automation functions
>AC/DC distribution and protection
>Battery management system
>Integrated EMS
>IoT Ready
C-Cab
>Lithium ion battery
>LFP technology
>186 kWh / rack
>Liquid cooling thermal management
>Integrated fire safety detection and extinction system B-Cab
SUNSYS HES L©
Modular outdoor Energy Storage System
from 50 kVA / 186 kWh to 550 kVA / 1116 kWh systems
4 Catalogue
Packet Page 910 of 1189Attachment 2 Page 158 of 159

System information
Power modularity 50 kVA power modules - up to 300 kVA per cabinet Symmetrical overload 110% during 30 min - 125% during 10 min - 150% during 30 s Chemistry LFP - Lithium Iron Phosphate
Energy Nameplate 186 kWh per cabinet
AC/AC Max Round Trip Efficiency 90%
Maximum C-rate 0.5 C
Maximum DC current 82 A charging / 87 A discharging per 50 kVA power module Power rating 50 kW 100 kW 150 kW 200 kW 250 kW 300 kW
AC rated current 60 A 120 A 180 A 241 A 301 A 361 A
AC max. temporary current (overload)90 A 180 A 271 A 361 A 451 A 541 A AC connections Up to 4 x 95 mm²/3/0AWG - 3 x 150 mm²/300MCM - 2 x 185 mm²/350MCM Rated voltage (Un)480 Vac (3ph+N) ±20%
Rated frequency 60 Hz ±5%
Fire protection Fire Safety System including smoke detectors, heat detectors and aerosol Environment
Degree of protection IP 55 / NEMA 3R (Outdoor)
Operation temperature -20 to +45 C° / -4 to +113°F without derating Storage temperature -20 to +60 C° / -4 to +140°F
Acoustic level at 1 m < 64.8 dB
Maximum altitude 1000 m / 3280 ft. without derating (consult us for requirements above this) Two system installation options according to the space available on your site On-line installation
Up to 6 B-Cabs - dimensions (mm/in)
791
127.5
6 100
0 39.3
7 1300

51.2 1500

59.1 B-Cab
B-Cab
B-CabB-CabB-Cab
B-Cab
C-Cab
500

19.7 700

27.56228089.76 216085.04130
0 51.2
sunsys_336_a_us.aiBack-to-back installation
Up to 6 B-Cabs - dimensions (mm/in)B-Cab
B-CabB-CabB-CabB-CabB-CabC-Cab
100
039.3
7 395
6155.
7 5
1300

51.18 1500

59.06 1300

51.18500

19.69 1500

59.06 216085.04228089.76 700

27.56 130
0 51.1
8 sunsys_337_a_us.aiTechnical Data
SUNSYS HES L©
Modular outdoor Energy Storage System
from 50 kVA / 186 kWh to 550 kVA / 1116 kWh systems
5Catalogue
Packet Page 911 of 1189Attachment 2 Page 159 of 159

Agenda Item No: 15.

AGENDA REPORT
DATE:May 7, 2024
TO:Mayor and City Council
FROM:David Gassaway, City Manager
SUBJECT:Public Hearing; and
Resolution 2024­108 of the City Council of the City of Fairfield Annexing Territory (Cement Hill Retail Center) to Community Facilities District No. 2023­2 (Train Station Specific Plan II) as Annexation No. 1, Authorizing the Levy of a Special Tax Within the Annexed Territory, and Submitting the Levy of a Special Tax to the Qualified Electors Thereof; and
Resolution 2024­109 of the City Council of the City of Fairfield Declaring the Results of a Special Annexation Election in Territory Annexed to Community Facilities District No. 2023­2 (Train Station Specific Plan II), Determining the Validity of Prior Proceedings, and Directing Recording of Amended Notice of Special Tax Lien for City of Fairfield Community Facilities District No. 2023­2 (Train Station Specific Plan II) Annexation No. 1 (Cement Hill Retail Center)
RECOMMENDED ACTION
Hold public hearing and adopt resolutions.

STATEMENT OF ISSUE
The conditions of approval for the Cement Hill Retail Center development require that the property be annexed to Community Facilities District No. 2023­2 (CFD 2023­2 or District). CFD 2023­2 was formed by the City to offset the increased costs associated with the new development for public safety services; maintenance and operation of public parks and public open space; operation and maintenance of public cemeteries; maintenance and operation of landscaping, linear parks, storm drainage basins, streets lights, pump stations, and/or the public lake. A public hearing must be held on the question of whether to annex the property to CFD 2023­2. In the absence of majority protest, the attached resolutions annex the territory to CFD 2023­2, authorize the levy of a special tax within the annexed territory subject to voter approval, call an election to allow the property owner to cast a ballot on the levy of a special tax, and declare the result of such election.

DISCUSSION
Packet Page 912 of 1189

Agenda Item No: 15.AGENDA REPORTDATE:May 7, 2024 TO:Mayor and City CouncilFROM:David Gassaway, City ManagerSUBJECT:Public Hearing; and Resolution 2024­108 of the City Council of the City of Fairfield Annexing Territory(Cement Hill Retail Center) to Community Facilities District No. 2023­2 (Train StationSpecific Plan II) as Annexation No. 1, Authorizing the Levy of a Special Tax Within theAnnexed Territory, and Submitting the Levy of a Special Tax to the Qualified ElectorsThereof; and Resolution 2024­109 of the City Council of the City of Fairfield Declaring the Results ofa Special Annexation Election in Territory Annexed to Community Facilities District No.2023­2 (Train Station Specific Plan II), Determining the Validity of Prior Proceedings,and Directing Recording of Amended Notice of Special Tax Lien for City of FairfieldCommunity Facilities District No. 2023­2 (Train Station Specific Plan II) Annexation No.1 (Cement Hill Retail Center)RECOMMENDED ACTIONHold public hearing and adopt resolutions.STATEMENT OF ISSUEThe conditions of approval for the Cement Hill Retail Center development require that the property beannexed to Community Facilities District No. 2023­2 (CFD 2023­2 or District). CFD 2023­2 wasformed by the City to offset the increased costs associated with the new development for public safetyservices; maintenance and operation of public parks and public open space; operation andmaintenance of public cemeteries; maintenance and operation of landscaping, linear parks, stormdrainage basins, streets lights, pump stations, and/or the public lake. A public hearing must be held onthe question of whether to annex the property to CFD 2023­2. In the absence of majority protest, theattached resolutions annex the territory to CFD 2023­2, authorize the levy of a special tax within theannexed territory subject to voter approval, call an election to allow the property owner to cast a ballot onthe levy of a special tax, and declare the result of such election.

DISCUSSION
The Train Station Specific Plan (TSSP) is a development plan and design for a new community environment in the northeast portion of the City that was approved by City Council in 2011. To minimize the financial impact to the City, all new development in the TSSP is required to be a part of a CFD.

These funds will be used for public safety services, the operation and maintenance of public parks, public open space, public cemeteries, public landscaping, linear parks, storm drainage basins, streets lights, pump stations, and/or the public lake, and all associated administrative support in the TSSP (Services). CFD 2018­1 and CFD 2023­2 were established in 2018 and 2023 by Resolution Nos. 2018­211 and 2023­204, respectively, to fund the Services through the annual collection of special taxes levied on properties in the districts.

The property proposed for annexation is owned by KSC Capital Investments LLC, a California Limited Liability Company, and SKC & Brothers LLC, a California Limited Liability Company. The property is located west of Peabody Road and south of Cement Hill Road within the boundary of assessor’s parcel numbers (APN) 0170­250­060 and 0170­250­070, as depicted on Exhibit A. The development on the property will be a drive­through car wash, a convenience store, and a gas station. Development of this property will change the property’s characteristics and manner in which the property will be used, thereby creating a need for more services funded by CFD 2023 ­2.

The property is located directly adjacent to the southwest border of the TSSP boundaries. Due to the proximity of the development to the TSSP, the City has determined that these parcels will receive benefit from the Services and are required to annex to CFD 2023­2.

The City contracts with Willdan Financial Services for the preparation of the necessary resolutions and balloting procedures for the annexation process. This process is a specialty service that the City has contracted out since 1995, on an individual consultant services basis for each development requiring annexation into a Mello Roos community facilities district.

The council adopted Resolution No. 2024­64 on April 2, 2024, to declare its intention to annex the territory to CFD 2023­2 and set a public hearing for May 7, 2024. Following the public hearing, and in the absence of a majority protest and approval by the property owner, the adoption of the attached resolutions will annex the territory to CFD 2023­2, call and hold an election of the property owner within the annexed territory, declare the results of the special election, and authorize the levy of the special taxes within the annexed territory, thereby concluding the annexation process.

Once the annexation is complete, the annexed territory will be designated as Annexation No. 1. The property owner of Annexation No. 1 will be required to pay annual special taxes for CFD 2023­2, beginning in fiscal year (FY) 2024­2025, as itemized on their property tax bill in accordance with the Rate and Method of Apportionment of Special Tax for 2023­2.

FINANCIAL IMPACT
The anticipated annual revenue to be received by the City (CFD 2023­2 Fund 336) for this annexation is estimated to be $7,739.14, which is based on the FY 2023 ­2024 maximum special tax rates for a developed commercial property in Zone 1. The CFD 2023­2 maximum special tax rates include an automatic annual consumer price index (CPI) adjustment. The process for the annexation is funded by the developer and no general fund monies are used for this effort.

PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
If the council has any questions concerning the required annexation of this development, this item may Packet Page 913 of 1189

Agenda Item No: 15.AGENDA REPORTDATE:May 7, 2024 TO:Mayor and City CouncilFROM:David Gassaway, City ManagerSUBJECT:Public Hearing; and Resolution 2024­108 of the City Council of the City of Fairfield Annexing Territory(Cement Hill Retail Center) to Community Facilities District No. 2023­2 (Train StationSpecific Plan II) as Annexation No. 1, Authorizing the Levy of a Special Tax Within theAnnexed Territory, and Submitting the Levy of a Special Tax to the Qualified ElectorsThereof; and Resolution 2024­109 of the City Council of the City of Fairfield Declaring the Results ofa Special Annexation Election in Territory Annexed to Community Facilities District No.2023­2 (Train Station Specific Plan II), Determining the Validity of Prior Proceedings,and Directing Recording of Amended Notice of Special Tax Lien for City of FairfieldCommunity Facilities District No. 2023­2 (Train Station Specific Plan II) Annexation No.1 (Cement Hill Retail Center)RECOMMENDED ACTIONHold public hearing and adopt resolutions.STATEMENT OF ISSUEThe conditions of approval for the Cement Hill Retail Center development require that the property beannexed to Community Facilities District No. 2023­2 (CFD 2023­2 or District). CFD 2023­2 wasformed by the City to offset the increased costs associated with the new development for public safetyservices; maintenance and operation of public parks and public open space; operation andmaintenance of public cemeteries; maintenance and operation of landscaping, linear parks, stormdrainage basins, streets lights, pump stations, and/or the public lake. A public hearing must be held onthe question of whether to annex the property to CFD 2023­2. In the absence of majority protest, theattached resolutions annex the territory to CFD 2023­2, authorize the levy of a special tax within theannexed territory subject to voter approval, call an election to allow the property owner to cast a ballot onthe levy of a special tax, and declare the result of such election.DISCUSSIONThe Train Station Specific Plan (TSSP) is a development plan and design for a new communityenvironment in the northeast portion of the City that was approved by City Council in 2011. To minimizethe financial impact to the City, all new development in the TSSP is required to be a part of a CFD.These funds will be used for public safety services, the operation and maintenance of public parks,public open space, public cemeteries, public landscaping, linear parks, storm drainage basins, streetslights, pump stations, and/or the public lake, and all associated administrative support in the TSSP(Services). CFD 2018­1 and CFD 2023­2 were established in 2018 and 2023 by Resolution Nos.2018­211 and 2023­204, respectively, to fund the Services through the annual collection of specialtaxes levied on properties in the districts.The property proposed for annexation is owned by KSC Capital Investments LLC, a California LimitedLiability Company, and SKC & Brothers LLC, a California Limited Liability Company. The property islocated west of Peabody Road and south of Cement Hill Road within the boundary of assessor’s parcelnumbers (APN) 0170­250­060 and 0170­250­070, as depicted on Exhibit A. The development on theproperty will be a drive­through car wash, a convenience store, and a gas station. Development of thisproperty will change the property’s characteristics and manner in which the property will be used,thereby creating a need for more services funded by CFD 2023 ­2.The property is located directly adjacent to the southwest border of the TSSP boundaries. Due to theproximity of the development to the TSSP, the City has determined that these parcels will receivebenefit from the Services and are required to annex to CFD 2023­2.The City contracts with Willdan Financial Services for the preparation of the necessary resolutions andballoting procedures for the annexation process. This process is a specialty service that the City hascontracted out since 1995, on an individual consultant services basis for each development requiringannexation into a Mello Roos community facilities district.The council adopted Resolution No. 2024­64 on April 2, 2024, to declare its intention to annex theterritory to CFD 2023­2 and set a public hearing for May 7, 2024. Following the public hearing, and inthe absence of a majority protest and approval by the property owner, the adoption of the attachedresolutions will annex the territory to CFD 2023­2, call and hold an election of the property owner withinthe annexed territory, declare the results of the special election, and authorize the levy of the specialtaxes within the annexed territory, thereby concluding the annexation process.    Once the annexation is complete, the annexed territory will be designated as Annexation No. 1. Theproperty owner of Annexation No. 1 will be required to pay annual special taxes for CFD 2023­2,beginning in fiscal year (FY) 2024­2025, as itemized on their property tax bill in accordance with theRate and Method of Apportionment of Special Tax for 2023­2.FINANCIAL IMPACTThe anticipated annual revenue to be received by the City (CFD 2023­2 Fund 336) for this annexationis estimated to be $7,739.14, which is based on the FY 2023 ­2024 maximum special tax rates for adeveloped commercial property in Zone 1. The CFD 2023­2 maximum special tax rates include anautomatic annual consumer price index (CPI) adjustment. The process for the annexation is funded bythe developer and no general fund monies are used for this effort.PUBLIC CONTACT/ADVISORY BODY RECOMMENDATIONN/A ALTERNATIVE ACTION
If the council has any questions concerning the required annexation of this development, this item may be rescheduled until the next council meeting to allow staff to provide the necessary background information. However, if the annexation is not approved, the conditions of approval for this development would not be fulfilled and the development process would cease.

STAFF CONTACT
Chris Lewis, Sr. Management Analyst
(707) 428 ­7089
[email protected]
COORDINATED WITH
N/A
ATTACHMENTS:

Description
Attachment 1: Proposed Resolution Annexing Territory
Attachment 2: Exhibit A Boundary Map
Attachment 3: Exhibit A ­ Ballot
Attachment 4: Proposed Resolution Declaring Results
Attachment 5: Exhibit A ­ Declaring Results
REVIEWERS:

Reviewer Action Date
Panganiban, Ryan Approved 4/22/2024 ­ 5:09 PM
Kaushal, Paul Approved 4/22/2024 ­ 7:07 PM
Dombrowski, Delaney Approved 4/22/2024 ­ 7:17 PM
Dombrowski, Delaney Approved 4/22/2024 ­ 7:17 PM
Packet Page 914 of 1189

CITY OF FAIRFIELD

RESOLUTION NO. 2024-108

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FAIRFIELD ANNEXING TERRITORY (CEMENT HILL RETAIL CENTER) TO COMMUNITY FACILITIES DISTRICT NO. 2023 -2 (TRAIN STATION SPECIFIC PLAN II) AS ANNEXATION NO. 1, AUTHORIZING THE LEVY OF A SPECIAL TAX

WITHIN THE ANNEXED TERRITORY, AND SUBMITTING THE LEVY OF A SPECIAL TAX TO THE

QUALIFIED ELECTORS THEROF

WHEREAS, this City Council, on April 2, 2024, adopted Resolution No. 2024-64 (Resolution of Intention) stating its intention to annex certain territory to the City’s existing Community Facilities District No. 2023-2 (Train Station Specific Plan II) (CFD 2023-2), pursuant to the Mello- Roos Community Facilities Act of 1982, as amended (Chapter 2.5, Part 1, Division 2, Title 5 of the Government Code) (Act); and

WHEREAS, a copy of the Resolution of Intention, incorporating a description and map of the proposed boundaries of the territory to be annexed to CFD 2023 -2 (Territory) and stating the facilities and services (Services) to be provided and the rate and method of apportionment of the special tax to be levied within the CFD to pay for the Services (Rate and Method), is on file with the city clerk and the provisions thereof are fully incorporated herein by this refere nce as if fully set forth herein; and

WHEREAS, the Resolution of Intention set May 7, 2024, as the date of the public hearing on the proposed annexation of the Territory to CFD 2023-2; and

WHEREAS, notice of the public hearing was published in accordance with the Act; and

WHEREAS, on May 7, 2024, this council held a public hearing as required by the Act and the Resolution of Intention relative to the proposed annexation of territory to CFD 2023 -2; and

WHEREAS, at said hearing, interested persons desiring to be heard on all matters pertaining to the annexation of the Territory to CFD 2023-2 and the levy of said special taxes within the Territory were heard, and a full and fair hearing was held, evidence was presented to this council regarding the annexation and special taxes, and this council is fully advised as to all matters relating to the annexation of the Territory to CFD 2023-2 and the special taxes; and

WHEREAS, prior to the time fixed for said hearing, written protests had not been filed with the city clerk against the proposed annexation of the Territory to CFD 2023 -2 by (i) 50% or more of the registered voters or six registered voters, whichever is more, residing in CFD 2023 -2, or (ii) or more of the registered voters, or six registered, whichever is more, residing in the Territory, or (iii) owners of one-half or more of the area of land in CFD 2023-2 and not exempt from the

Packet Page 915 of 1189Attachment 1 Page 1 of 4

RES. NO. 2024-108

Page 2 ends
← All documents from this meeting