Cities Index.
Agenda packet, regular meeting

Folsom City Council
May 10, 2022

Document
Agenda packet, regular meeting
Meeting
May 10, 2022
Body
Folsom City Council
Pages
2,322
Original file
171.3 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

05/10/2022 Item No.17.

Condition will be
satisfied prior to
issuance of a
building permit.

Conditioned
Satisfied
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Comments
Sacramento
County Public
Works
Department
Responsible
Department
Before project
build out.

Constructionof phase twoofthe Hazel
Avenue
widening,from MadisonAvenue to
Curragh
Downs Drive,is expected tobe completedby year 201 3,
before the
first phase of
the Proposed
Project or
alternative iscomplete. The
applicant shall
pav its
When
Requiied
project is
environmental
ly cleared and
fully funded,
it's
construction
is expected to
be completebefore the
first phase of
the Proposed
Project or
alternative is
built.

Participate in Fair Share Funding of Improvements toReduce lmpacts on Hazel Avenue between Madison Avenue and Curragh Downs Drive (Roadway Segtnent
10).

To ensure that Hazel Avenue operates at an acceptable LOS between Curragh Downs Drive and Gold Country Boulevard,Hazel Avenue must be widened to six lanes. Thisimprovement is part of the County adopted Hazel Avenue widening project.

Condition of Approvals
improvements include twoeastbound through lanes, one
eastbound right turn lane, two northbound
left turn lanes, two northbound right turn lanes, two
westbound left turn lanes and two westbound through
lanes. This improvement also includes the signalization of the White Rock Road and Grant Line Road intersection.With implementation of this improvement, the intersectionwould operate at an acceptable LOS A. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements, based on a
program established by that agency to reduce the impacts to the Grant Line Road/White Rock Road intersection
(Sacramento County lntersection 3).
3A.15-1j
(FPASP
ErR/ErS)
Mitigation
Measure
53-
32 WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PIANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR OF

ADMINISTRATIVE NAMES
No.

Page 432 ends

05/10/2022 Item No.17.
coNDrTroNs oF AppRovAL FoR THE PHASE r C SOUTH SUBDIVTSTON (PN 21-086)

WESTOF SAVANNAH PARKWAY, SOUTH OF MANGINIPARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTING TENTAT]VE SUBDIVISION MAP, PIANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW' AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
Department
El Dorado
County
Department of
Transportation
When
Required
proportionate
share of
funding of
improvements
to the agency
responsible
for
improvements
,
based on a
program
established
by thatagency to
reduce theimpacts to
Hazel Avenue
betweenMadison
Avenue and
Curragh
Downs Drive(Sacramento
County
Roadway
Seoment 10).

Before projectbuild out. Aphasing
analysis
should be
performedprior to
approval of
the first
subdivision
mao to
Condition of Approvals
Participate in Fair Share Funcling of lmprovements toReduce lmpacts on the White Rock Road/Windfield WayIntersection (El Dorado County lntersection 3).

To ensure that the White Rock RoadAffindfield Way
intersection operates at an acceptable LOS, the intersectionmust be signalized and separate northbound left and right turnlanes must be striped. The applicant shall pay itsproportionate share of funding of improvements to the agencyresponsible for improvements, based on a program established by that agency to reduce the impacts to the White Mitigation
Measure
3A.15.1t(FPASP
ErR/ErS)
No.
53-33

Page 433 ends

05/10/2022 Item No.17.

Condition will be
satisfied prior to
issuance of a
building permit.

Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

SacramentoCounty
Department of
Transportationand the City of
Rancho CordovaDepartment ofPublic Works
Responsible
Department
City of FolsomCDD andSacramentoCounty
Department of
Transportation
Before projectbuild out. Aphasing
analysisshould be
performed
prior to
aporoval of
When
Required
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. A
phasing
analysisshould be
performed
prior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.

Participate in Fair Share Funding of lmprovemenb toReduce lmpacts on the Grant Line Roadl State Route 16Intersection (Caltrans lntersection 1 2).

To ensure that the Grant Line Road/State Route 16
intersection operates at an acceptable LOS, the northbound and southbound approaches must be reconfigured toconsist of one leftturn lane and one shared through/rightturn lane. Protected left-turn signal phasing must be Condition of Approvals
Rock RoadMindfield Way intersection (El Dorado County
lntersection 3).

Participate in Fair Share Funding of lmprovements to
Reducle lmpacts on Eastbound U.S. 50 as an alternative
to improvements at the Folsom Boulevard/U.5. 50Eastbound Ramps lntersection (Caltrans lntersection 4).Congestion on eastbound U.S. 50 is causing vehicles to use Folsom Boulevard as an alternate parallel route until theyreach U.S. 50, where they must get back on the freeway due to the lack of a parallel route. lt is preferred to alleviatethe congestion on U.S. 50 than to upgrade the intersection at the end of this reliever route. The applicant shall pay its proportionate share of funding of improvements to the
agency responsible for improvements, based on a programestablished by that agency to reduce the impacts to the Folsom BoulevardiU.S. 50 Eastbound Ramps intersection(Caltrans lntersection 4). To ensure that the FolsomBoulevard/U.S. 50 eastbound ramps intersection operates at an acceptable LOS, auxiliary lanes should be added toeastbound U.S. 50 from Hazel Avenue to east of FolsomBoulevard. This was recommended in the Traffic
Operations Analysis
Report for the U.S. 50 Auxiliary Lane Project.
3A.15-1p(FPASP
ErR/ErS)
Measure
Mitigation
3A.15-1o
(FPASP
ErR/ErS)
53-35
53-34

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARI(VIIAY AND NORTH OF WHITE ROCK SMALL-LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW AND MINOR

ADMIN TIONS AND STREET NAMES
'tc
No.

Page 434 ends

05/10/2022 Item No.17.
coNDtTtoNS oF APPROVAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 21-086) WEST OF SAVANNAH PARIflI'AY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL-LOTVESTTNG TENTATTVE SUBD|VIS|ON MApi PLANNED DEVELOPMENT PERMTT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
Caltrans
When
Required
the first
subdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out.Constructionof theSacramento50 BusCarpool Laneand Community
Enhancement
s Project isexpected to
be completedby year 201 3,before the
first phase ofthe Proposed
Project or
alternative iscomplete.Constructionof theSacramento50 BusCarpool Lane Condition of Approvals
provided on the northbound and southbound approaches.
lmprovements to the Grant Line Road/State Route 16
intersection are contained within the County Development Fee Program and are scheduled for Measure A funding.lmprovements to this intersection must be implementedby Caltrans, Sacramento County, and the City ofRancho Cordova.

The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce theimpacts to the Grant Line Road/State Route 16 intersection(Caltrans lntersection 1 2).Participate in Fair Share Funding of lmprovements to Reduce lmpacts
on Eastbound U.S. 50 between Zinfandel Drive andSunrise Boulevard(Freeway Segment 1).

To ensure that Eastbound U.S. 50 operates at an acceptable LOS between Zinfandel Drive and Sunrise Boulevard, a buscarpool (HOV) lane must be constructed. This improvementis currently planned as part of the Sacramento 50 BusCarpool Lane and Community EnhancementsProject. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for
improvements, based on a program established by that
agency to reduce the impacts to Eastbound U.S. 50 between Zinfandel Drive and Sunrise Boulevard (Freeway Segment 1) Mitigation
Measure
3A.15-1q
(FPASP
ErR/ErS)
No.
53-
36

Page 435 ends

05/10/2022 Item No.17.

CONDITIONS OF APPROVAL FOR THE PHASE I G SOUTH suBDrvrsroN (PN 2r.086) WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARIfl1IAY AND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISTON MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMI NISTRATIVF MODIFIEA TIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
Department
City of FolsomCommunity
Development
Department and
SacramentoCounty
Department of
Transportation
City of FolsomCommunity
DevelopmentDepartment and
SacramentoCounty
Department of
Transportation
When
Required
andCommunity
Enhancement
s Project hasstarted sincethewriting of the
Draft EIS/ElR.

Before project
build out. Aphasing
analysisshould be
performed todetermineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval of
the first
subdivision
map to
determine
during which
project phase
the
Condition of Approvals
Participate in Fair Share Funding of lmprovements toReduce lmpacts on Eastbound U.S. 50 between Hazel Avenue and Folsom Boulevard (Freeway Segment 3).

To ensure that Eastbound U.S. 50 operates at an acceptable LOS between Hazel Avenue and Folsom Boulevard, an
auxiliary lane must be constructed. This improvement was recommended in the Trafiic Operations Analysis Report for the U.S. 50 Auxiliary Lane Project. This improvement is included in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce theimpacts to Eastbound U.S. 50 between Hazel Avenue and Folsom Boulevard (Freeway Segment 3).

Participate in Fair share Functing of lmprovements to
Reduce lmpacts
on Eastbound U.S. 50 between Folsom Boulevard and
Prairie City
Road (Freeway Segment 4).

To ensure that Eastbound U.S. 50 operates at an acceptable LOS between Folsom Boulevard and Prairie City Road, an
auxiliary lane must be constructed. This improvement was recommended in the Traffic Operations Analysis Report for the U.S. 50 Auxiliary Lane Project. This improvement is included in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or
other appropriate and reliable mechanism paid for byaoolicant. to reduce the impacts to Eastbound U.S. 50 Mitigation
Measure
3A.15-1r
(FPASP
ErR/ErS)
3A.15-1s
(FPASP
ErR/ErS)
No.
53-37
53-38

Page 436 ends

05/10/2022 Item No.17.
coNDtTtoNs oF AppRovAL FoR THE PHASE I G SOUTH SUBDTVISION (PN 2r-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS ANN STNFFT NAMFS
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
crty 01 FolsomCommunity
DevelopmentDepartment and
SacramentoCounty
Department of
Transportation
City of RanchoCordova
Department ofPublic Works
and Sacramento
County
Department of
Transportation
When
Required
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
between Folsom Boulevard and PrairieCity Road (Freeway
Segment 4).

Participate in Fair Share Funding of lmprovements to
Reduce lmpacts on Westbound U.S. 50 between Prairie
City Road and Folsom Boulevard (Freeway Segment 16).

To ensure that Westbound U.S. 50 operates at an acceptable LOS between Prairie City Road and Folsom Boulevard, an
auxiliary lane must be constructed. This improvement was recommended in the Traffic Operations Analysis Report for the U.S. 50 Auxiliary Lane Project. This improvement is included in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or
other appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to Westbound U.S. 50 between Prairie City Road and Folsom Boulevard (FreewaySegment 16).

Participate in Fair Share Funding of lmprovements toReduce lmpacts on Westbound U.S. 50 between Hazel Avenue and Sunrise Boulevard (Freeway Segment 18),
To ensure that Westbound U.S. 50 operates at anacceptable LOS between Hazel Avenue and Sunrise Boulevard, an auxiliary lane must be constructed. This
improvement was recommended in the Traffic Operations
Analysis Report for the U.S. 50 Auxiliary Lane Project and included in the proposed Rancho Cordova Parkwayinterchange project. lmprovements to this freeway segment must be implemented by Caltrans. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for
improvements, based on a program established by that
agency to reduce the impacts to Westbound U.S. 50 between Hazel Avenue and Sunrise Boulevard (Freewav
Mitigation
Measure
3A.15-1u(FPASP
ErR/ErS)
3A.15-1v(FPASP
ErR/ErS)
No.
53-39
53-
40

Page 437 ends

05/10/2022 Item No.17.

GONDTTTONS OF APPROVAL FORTHE PHASE I C SOUTH SUBDIVISION (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIO NS AND STRFFT NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
Department
City of FolsomCommunity
DevelopmentDepartment and
Sacramento
County
Department of
Transportation
City of FolsomCommunity
DevelopmentDepartment and
SacramentoCounty
Department of
Transportation
When
Required
should be
built.Before projectbuild out. A
phasing
analysisshould be
performedprior to
approval ofthe first
subdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasinganalysis
should be
performedprior to
approval of
the first
subdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
Segment 18)
Participate in Fair Share Funding of lmprovements to
Reduce lmpacts on U.S. 50 Eastbound/Folsom BoulevardRamp Merge (Freeway Merge 4).

To ensure that Eastbound U.S. 50 operates at anacceptable LOS at the Folsom Boulevard merge, anauxiliary lane from the Folsom Boulevard merge to the Prairie City Road diverge must be constructed. Thisimprovement was recommended in the Traffic Operations Analysis Report for the U.S. 50 Auxiliary Lane Project. This improvement isincluded in the proposed 50 Corridor
Mobility Fee Program. The
applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce theimpacts to the U.S. 50 Eastbound/Folsom Boulevard Ramp Merge (Freeway Merge 4).

Participate in Fair Share Funding of lmprovements toReduce lmpacts on U.S. 50 Eastbound/Prairie City Road Diverge (Freeway Diverge 5). To ensure that EastboundU.S. 50 operates at an acceptable LOS at the Prairie CityRoad off-ramp diverge, an auxiliary lane from the Folsom Boulevard merge must be constructed. This improvement
was recommended in the Traffic Operations Analysis
Report for the U.S. 50
Auxiliary Lane Project. This auxiliary lane improvement is included in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements, as may bedetermined by a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce theimpacts to the U.S. 50 Eastbound/Prairie City Road diverge (Freeway Diverge 5).

Mitigation
Measure
3A.15-1w
(FPASP
ErR/ErS)
3A.15-1x
(FPASP
ErR/ErS)
No.
53-41
53-42

Page 438 ends

05/10/2022 Item No.17.

CONDITIONS OF APPROVAL FOR THE PHASE 'I c souTH suBDlvlsloN (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK

SMALL-LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND,MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMEC
conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

ResponsibleDepartment
City of FolsomCommunity
DevelopmentDepartment
City of FolsomCommunity
DevelopmentDepartment
When
Required
should be
built.Before projectbuild out. A
phasing
analysisshould be
performed
prior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasinganalysis
should be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
Participate in Fair Share Funding of Improvements to
Reduce lmpacts
on U.S. 50 Eastbound/Prairie City Road Direct Merge
(Freeway Merge6).

To ensure that Eastbound U.S. 50 operates at an acceptable LOS at the Prairie City Road onramp direct merge, an
auxiliary lane to the East Bidwell Street - Scott Road diverge must be constructed. This auxiliary lane improvement is included in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study orother appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to the U.S. 50 Eastbound/Prairie City Road direct merge (Freeway Merge 6) Participate in Fair Share Funding of lmprovements toReduce lmpacts on U.S. 5O Eastbound/Prairie City Road Flyover On-Rampto Oak Avenue Parkway Off-Ramp Weave (Freeway Weave 8).

To ensure that Eastbound U.S. 50 operates at an acceptable LOS at the Prairie City Road flyover on-ramp to Oak AvenueParkway off-ramp weave, an improvement acceptable to Caltrans should be implemented toeliminate the
unacceptable weaving conditions. Such an improvementmay involve a "braided ramp".

The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study orother appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to the U.S. 50 Eastbound / Prairie City Road flyover on-ramp to Oak Avenue Parkway off-ramo weave (Freewav Weave 8).

Mitigation
Measure
3A.15Jy
(FPASP
ErR/ErS)
3A.15-12
(FPASP
ErR/ErS)
No.
53-
43 53-44

Page 439 ends

05/10/2022 Item No.17.
coNDtTtoNs oF AppRovAL FoR THE PHASE I C SOUTH SUBDTVISTON (PN 2l-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PI.ANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
City of FolsomCommunity
DevelopmentDepartment
City of FolsomCommunity
Development
Department
When
Required
should be
built.Before projectbuild out. Aphasinganalysis
should be
performedprior to
approval ofthe firstsubdivision
map to
determine
during which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivisiori
map to
determineduring which
project phase
the
improvement
Condition of Approvals
Participate in Fair Share Funding of lmprovements toReduce lmpacts on U.S. 50 Eastbound/Oak Avenue Parkway Loop Merge (Freeway Merge 9).To ensure that Eastbound U.S. 50 operates at an acceptable LOS at the Oak Avenue Parkway loop merge, an auxiliary lane to the East Bidwell Street - Scott Road diverge must beconstructed. This auxiliary lane improvement is included in the proposed 50 Corridor Mobility Fee Program. The applicantshall pay its proportionate share of funding of improvements,as may be determined by a nexus study or other appropriateand reliable mechanism paid for by applicant, to reduce the impacts to the U.S. 50 Eastbound/ Oak Avenue Parkway loopmerge (Freeway Merge 9).

Participate in Fair Share Funding of lmprovements to
Reduce Impacts on U.S. 50 Westbound/Empire Ranch
Road Loop Ramp Merge (Freeway Merge 23).

To ensure that Westbound U.S. 50 operates at an acceptable LOS, the northbound Empire Ranch Road loop on ramp
should start the westbound auxiliary lane that ends at the East Bidwell Street - Scott Road off ramp. The slip on ramp from southbound Empire Ranch Road would merge into this extended auxiliary lane. lmprovements to this freeway
segment must be implemented by Caltrans. The applicantshall pay its proportionate share of funding of improvements,as may be determined by a nexusstudy or other appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to the U.S. 50 Westbound/Empire
Ranch Road loop ramp merge (Freeway Merge 23).

Mitigation
Measure
3A.15-1aa
(FPASP
ErR/ErS)34.15-1dd(FPASP
ErR/ErS)
No
53-
45 53-
46

Page 440 ends

05/10/2022 Item No.17.

G(,NUI I IUNU LlF AI'I'K(,VAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
DeDartment
City of FolsomCommunity
DevelopmentDepartment
City of FolsomCommunity
DevelopmentDepartment and
SacramentoCounty
Department of
Transportation
When
Required
should be
built.Before project
build out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performed
prior to
approval of
the first
subdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
Pafticipate in Fair Share Funding of lmprovements toReduce lmpacts on U.S. 50 Westbound/Oak Avenue Parkway Loop Ramp
Merge
(Freeway Merge 29).

To ensure that Westbound U.S. 50 operates at an acceptable LOS, the northbound Oak Avenue Parkway loop on ramp
should start the westbound auxiliary lane that ends at the Prairie City Road off ramp. The slip on ramp from southboundOak Avenue Parkway would merge into this extended auxiliarylane. lmprovements to this freeway segment must beimplemented by Caltrans. The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce the impacts to the U.S. 50 Westbound/Oak Avenue Parkway loop ramp merge
(Freeway Merge 29).

Participate in Fair Share Funding of lmprovements toReduce lmpacts on U.S. 50 Westbound/Prairie City RoadLoop Ramp Merge (Freeway Merge 32).

To ensure that Westbound U.S. 50 operates at an acceptable LOS at the Prairie City Road loop ramp merge, an auxiliarylane to the Folsom Boulevard off ramp diverge must be constructed. This auxiliary lane improvement is included in the proposed 50 Conidor Mobility Fee Program. The applicant shall pay its proportionate share of funding of improvements,as may be determined by a nexus study or other appropriateand reliable mechanism paid for by applicant, to reduce the impacts to the U.S. 50 Westbound/Prairie City Road Loop Ramp Merge (Freeway Merge 32).

Mitigation
Measure
3A.'15-1ee
(FPASP
ErR/ErS)
3A.15.1ff
(FPASP
ErR/ErS)
No.
53-
47 53-
48

Page 441 ends

05/10/2022 Item No.17.

CONDITIONS oF APPROVAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 21-086)

WESTOF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTTNG TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
City of Folsom
Community
DevelopmentDepartment and
SacramentoCounty
Department of
Transportation
City of FolsomCommunity
DevelopmentDepartment and
SacramentoCounty
Department of
Transportation
When
Required
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
Participate in Fair Share Funding of lmprovements to
Reduce lmpacts
on U.S. 50 Westbound/Prairie City Road Direct RampMerge (FreewayMerge 33).

To ensure that Westbound U.S. 50 operates at an
acceptable LOS at the Prairie City Road direct ramp merge,an auxiliary lane to the Folsom Boulevard off ramp diverge must be constructed. This auxiliary lane improvement isincluded in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or
other appropriate and reliable mechanism paid for by
applicant, to reduce theimpacts to the U.S. 50
Westbound/Prairie City Road direct ramp merge
(Freeway Merge 33).

Participate in Fair Share Funding of Improvements toReduce lmpacts on U.S. 50 Eastbound/Folsom Boulevard Diverge (Freeway Diverge 34).

To ensure that Westbound U.S. 50 operates at an acceptable LOS at the Folsom Boulevard Diverge, an auxiliary lane from the Prairie City Road loop ramp merge must be constructed.

Improvements to this freeway segment must be implemented by Caltrans. This auxiliary lane improvement is included in theproposed 50 Corridor Mobility Fee Program. The applicant shall pay its proportionate share of funding of improvements,as may be determined by a nexus study or other appropriateand reliable mechanism paid for by applicant, to reduce the impacts to the U.S. 50 Eastbound / Folsom Boulevard diverge(Freeway Diverge 34).

Mitigation
Measure
3A.15-1gg(FPASP
ErR/ErS)3A.t 5.1hh
(FPASP
ErR/ErS)
No.
53-
49 53-50

Page 442 ends

05/10/2022 Item No.17.
-coNDtToNsOF
AppRovAL FoRTHE PHASE 1 c sourH suBDlvlsloN (PN 2l-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK

SMALL-LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT, DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR ADMIIIICTE' ATII'E MI.tNIEIfTA TIONS aND STREET NATI,IES Conditioned
Satisfied
Gondition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportationand City of
Rancho CordovaDepartment ofPublic Works
City of FolsomCommunity
DevelopmentDepartment
When
Required
should be
built.Before projectbuild out. A
phasing
analysisshould be
performed
prior to
approval ofthe firstsubdivision
map todetermineduring which
project phase
the
improvement
should be
built.Before
approval of
improvementplans for allprojectphases anyparticular
discretionarydevelopmentapplicationthat includes
residential
andcommercial or
mixed-use
development.

As a condition
Condition of Approvals
Participate in Fair Share Funding of lmprovements to
Reduce lmpacts
on U.S. 50 Westbound/Hazel Avenue Direct Ramp Merge(FreewayMerge 38).

To ensure that Westbound U.S. 50 operates at an
acceptable LOS at the Hazel Avenue direct ramp merge, anauxiliary lane to the Sunrise Boulevard off ramp diverge must be constructed. This auxiliary lane improvement is included in the proposed 50 Corridor Mobility Fee Program.

The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce the impacts to the U.S. 50Westbound/Hazel Avenue direct ramp merge (Freeway Merge s8).

Develop Commercial Support Services and Mixed-useDevelopment Concurrent with Housing Development and Develop and
Provide
Options for Alternative Transportation Modes.

The project applicant(s) for any particular discretionarydevelopment application including commercial or mixed-use development along with residential uses shall developcommercial and mixed-use development concurrent with housing development, to the extent feasible in light ofmarket realities and other considerations, to internalize vehicle trips.Pedestrian and bicycle facilities shall be implemented to the satisfaction
of the City Public Works Department. To further minimize impacts from the increased demand on area roadways andintersections, the project applicant(s) for any particular discretionarv develooment aoolication involvinq schools or Mitigation
Measure
3A.15-1ii(FPASP
ErR/ErS)
3A.15-2a(FPASP
ErR/ErS)
No.
53-51
53-52

Page 443 ends

05/10/2022 Item No.17.
eoNDrTroNs oF APPROVAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 2r-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINIPARKWAYAND NORTH OFWHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR ADMINISTRATIVE MODIFICATIONS AND STREET NAl'trG
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

ResponsibleDepartment
City of FolsomCommunity
Development
Department
City of FolsomCommunity
DevelopmentDepartmentCity of FolsomCommunity
DevelopmentDepartment
When
Required
of project
approvaland/or as acondition ofthedevelopment
agreement forall project
phases.

Concurrent
with
construction
for all project
phases.Concurrent
with
construction
for all project
phases.

As a condition
of projectapprovaland/or as acondition ofthe
developmentaqreement for
Condition of Approvals
commercial centers shall develop and implement safe andsecure bicycle parking to promote alternative transportation uses and reduce the volume of single-occupancy vehiclesusing area roadwaysand intersections. The project applicant(s) for any particulardiscretionary development application shall participate incapital improvements and operating funds for transit serviceto increase the percent of travel by transit. The project's fairshare participation and the associated timing of the improvements and service shall be identified in the projectconditions of approval andior the project's developmentagreement. lmprovements and service shall be coordinated,as necessary, with Folsom Stage Lines and Sacramento RT Participate in the City's Transportation Sysfem
M anagement Fee Program.The project applicant(s) for any particular discretionarydevelopment application shall pay an appropriate amount intothe City's existing Transportation System Management Fee Program to reduce the number of single-occupant automobile travel on area roadways and intersections.

Participate with the 50 Corridor Transportation
M a n a g e m e nt Associafion.

The project applicant(s) for any particular discretionary development application shall join and participate with the 50 Conidor Transportation Management Association to reduce the number of single-occupant automobile travel on area roadways and intersections.Pay Full Cost of ldentified lmprovements that Are NotFunded by the City's Fee Program. ln accordance with Measure W, the project applicant(s) for any particular discretionary development application shall provide fair-share contributions to the City's transportationimpact fee program to fully fund improvements only requiredbecause of the Specific Plan.

Mitigation
Measure
3A.15.2b
(FPASP
ErR/ErS)
3A.15-2c
(FPASP
ErR/ErS)
3A.15-3
(FPASP
ErR/ErS)
No
53-5353-
5453-55

Page 444 ends

05/10/2022 Item No.17.

Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Conditioned
Satisfied
This subdivision will pay its fair share of the
improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision. following
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Comments
City of Folsom
Community
DevelopmentDepartment
Responsible
Department
City of Folsom
Community
DevelopmentDepartment
Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map todetermineduring which
project phase
the
imorovement
When
Required
all project
phases.

Before projectbuild out. Aphasinganalysisshould be
performedprior toapproval of
the first
subdivision
map to
determineduring which
project phase
the
improvement
should be
built.

The Applicant Shall Pay a Fair Share to Fund the
Construction of lmprovements to the Oak Avenue
P a rkw ay/E a st Bi dw e I I Streef In terse cti o n ( F o I so m lntersection 6).

To ensure that the Oak Avenue Parkway/East Bidwell Street intersection operates at an acceptable LOS, the eastbound(East Bidwell Street) approach must be reconfigured to consist of two left{urn lanes, four through lanes and a right-turn lane, and the westbound (East Bidwell Street) approach must be reconfigured to consist of two left turn lanes, four throughlanes, and a right-turn lane. lt is against the City of Folsompolicy to have eight lane roads because of the impacts to nonmotorized traffic and adjacent development; therefore, thisimprovement is infeasible.

Condition of Approvals
The Applicant Shall Pay a Fair Share to Fund the
Construction oflmprovements to the Sibley StreeilBlue Ravine Roadlntersection (Folsom lntersection 2).

To ensure that the Sibley StreetiBlue Ravine Road
intersection operates at a LOS D with less than theCumulative No Project delay, the northbound approach mustbe reconfigured to consist of two left{urn lane, two throughlanes, and one dedicated right-turn lane. The applicant shall pay its proportionate share of funding of improvements, asmay be determined by a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce theimpacts to the Sibley Street/Blue Ravine Road intersection(Folsom lntersection 2). 3A.15.4b(FPASP
ErR/ErS)
Measure
Mitigation
3A.15-4a
(FPASP
ErR/ErS)
53-57

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

AND STREET NAMES
No.
53-56

Page 445 ends

05/10/2022 Item No.17.
coNDtTtoNs oF AppRovAL FoRTHE PHASE I C SOUTH SUBD|VTSTON (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK

SMALL,LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

ResponsibleDepartment
City of FolsomCommunity
DevelopmentDepartment
City of FolsomCommunity
DevelopmentDepartment
When
Required
should be
built.

Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map todetermineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
The Applicant Shail Pay a Fair Share to Fund the Construction of Improvements to the East Bidwell Street/College StreetIntersection (Folsom Intersection 7).

To ensure that the East Bidwell Street/College Street
intersection operates at acceptable LOS C or better, the westbound approach must be reconfigured to consist of one left-turn lane, one left-through lane, and two dedicated rightturn lanes. The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or other appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to the East Bidwell StreeVNesmith Court intersection (Folsom lntersection 7).

The Applicant Shall Pay a Fair Share to Fund the
Construction of lmprovements to the East Bidwell
Streeillron Point Road lntersection (Folsom
lntersection 27).

To ensure that the East Bidwell Street /lron Point Road intersection operates at an acceptable LOS, the northbound approach must be reconfigured to consist of two leftturn lanes, four through lanes and a right-turn lane, and thesouthbound approach must be reconfigured to consist of two left-turn lanes, four through lanes and a right-turn lane.

It is against the City of Folsom policy to have eight lane roads because of
the impacts to non-motorized traffic and adjacent
development; therefore, this improvement is infeasible.

Mitigation
Measure
3A.15-4c(FPASP
ErR/ErS)34.154d
(FPASP
ErR/ErS)
No.
53-58
53-59

Page 446 ends

05/10/2022 Item No.17.
coNDrTroNs oF APPROVAL FOR THE PHASE I C SOUTH SUBDIVISION (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

ResponsibleDepartment
City of FolsomCommunity
DevelopmentDepartment
City of Folsom
Community
Development
Department
When
Required
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasinganalysis
should be
performedprior to
approval of
the first
subdivision
map to
determineduring which
project phase
the
improvement
Condition of Approvals
The Applicant Shall Pay a Fair Share to Fund the
Construction ofImprovements to the Serpa Wayl lron Point Road Intersection (FolsomIntersection 23). . To improve LOS at the Serpa Way/ lron Point Road intersection, the northbound approaches must be restriped to consist of one left-turn lane, one shared leftthrough lanes,and one right-turn lane. The applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce the impacts to theSerpa Wayilron Point Road lntersection (Folsom lntersection 23).

The Applicant Shail Pay a Fair Share to Fund the
Construction oflmprovements to the Empire Ranch Road/lron Point Roadlntersection (Folsom lntersection 24).

To ensure that the Empire Ranch Road / lron Point Road
intersection operates at a LOS D or better, all of the followingimprovements are required: The eastbound approach mustbe reconfigured to consist of one leftturn lane, two throughlanes, and a right-turn lane. The westbound approach mustbe reconfigured to consist of two left-turn lanes, one throughlane, and a through-right lane. The northbound approachmust bereconfigured to consist of two left-turn lanes, three through lanes, and a
right-turn lane. The southbound approach must bereconfigured to consist of two leflturn lanes, three throughlanes. and a rioht-turn lane. The aoolicant shall oav its Mitigation
Measure
3A.15-4e(FPASP
ErR/ErS)3A.15.4f
(FPASP
ErR/ErS)
No
53-60
53-
61

Page 447 ends

05/10/2022 Item No.17.
coNDtTtoNs oF APPROVAL FOR THE PHASE 1 C SOUTH SUBDTVTSTON (PN 21-086)

WESTOF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
Infrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
City of Folsom
Community
Development
Department
SacramentoCounty
Department of
Transportation
When
Required
should be
built.

Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
Condition of Approvals
proportionate share of funding of improvements, as may be determined by a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce the impacts to theEmpire Ranch Road / lron Point Road lntersection Beforeproject build out. A phasing analysis should be performedprior to approval of the first subdivision map to determine during which project phase the improvement should be built. (Folsom lntersection 24).

The Applicant Shall Fund and Construct
Improvements to the Oak Avenue Parkway/Easton
Valley Parkway lntersection (Folsom lntersection 33).

To ensure that the Oak Avenue Parkway/Easton Valley
Parkway intersection operates at an acceptable LOS the
southbound approach must be reconfigured to consist of two left{urn lanes, two through lanes, and two right-turn lanes.

The applicant shall fund and construct these improvements.

Participate in Fair share Funding of lmprovements to
Reduce Impacts
on the Grant Line Road/White Rock Road lntersection(Sacramento County I ntersection 3).

To ensure that the Grant Line RoadMhite Rock Road
intersection operates at an acceptable LOS E or better thisintersection should be replaced by some type of grade separated intersection or interchange. lmprovements to this intersection are identified in the Sacramento Countv's
Mitigation
Measure
3A.15-49(FPASP
ErR/ErS)
3A.15.4i
(FPASP
ErR/ErS)
No
53-
62 53-
63

Page 448 ends

05/10/2022 Item No.17.
coNDtTtoNs oF APPROVAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 21-086) WEST OF SAVANNAH PARK\AIAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PI-ANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to buildinq permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportation
SacramentoCounty
Department of
Transportation.

When
Reouired
map to
determineduring which
project phase
the
improvement
should be
built.Before project
build out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
Condition of Approvals
Proposed General Plan. lmplementation of theseimprovements would assist in reducing traffic impacts on thisintersection by providing acceptable operation. lntersectionimprovements must be implemented by Sacramento County.

The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce theimpacts tothe Grant Line RoadANhite Rock Road lntersection (Sacramento County
lntersection 3).

Participate in Fair Share Funding of Improvements to
Reduce lmpacts on Grant Line Road between WhiteRock Road and Kiefer Boulevard (Sacramento County Roadway Segments 5-7).

To improve operation on Grant Line Road between White
Rock Road and Kiefer Boulevard, this roadway segment
must be widened to six lanes. This improvement isproposed in the Sacramento County and the City of Rancho Cordova General Plans; however, it is not in the 2035
MTP. lmprovements to this roadway segment must beimplemented by Sacramento County and the City ofRancho Cordova. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements, based on a program established by that agency to reduce the impacts to Grant Line Road between White Rock Road and Kiefer Boulevard (Sacramento
County Roadway Segments 5-
7). The identified improvement would more than offset the impacts specifically related to the Folsom South of U.S. 50project on this roadway segment..

Participate in Fair share Funding ot Improvements to
Reduce lmpacts on Grant Line Road between KieferBoulevard and Jackson Highway (Sacramento County Roadway Segment 8).

To improve operation on Grant Line Road between Kiefer
Mitigation
Measure
3A.15-4j
(FPASP
ErR/ErS)
3A.15-4k
(FPASP
ErR/ErS)
No
53-
64 53-65

Page 449 ends

05/10/2022 Item No.17.

Condition will be
satisfied prior to
issuance of a
building permit.

Conditioned
satisfied
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfraskucture Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Comments
SacramentoCounty
Department of
Transportation.

Responsible
Department
Before projectbuild out. Aphasinganalysis
should be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.

When
Required
performed
prior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.

Participate in Fair Share Funcling of lmprovements toReduce lmpacts on Hazel Avenue between Curragh Downs Drive and U'S'50 WestboundRamps (Sacramento County Roadway Segments 12-13).

To improve operation on Hazel Avenue between Curragh
Downs Drive and the U.S. 50 westbound ramps, thisroadway segment could be widened to eight lanes. Thisimprovement is inconsistent with Sacramento County's general plan because the county's policy requires a
maximum roadway cross section of six lanes. Analysisshown later indicates that improvements at the impacted intersection in this segment can be mitigated (see MitigationMeasure 3A. 1 S-aq). lmprovements to impacted intersections on this segment will improve operations on this roadwaysegment and, therefore; mitigate this segment impact. Theapplicant shall pay its proportionate share of funding of improvements to
the agency responsible for improvements, based on a
program established by that agency to reduce the impacts toHazel Avenue between Curraqh Downs Drive and U.S. 50 Condition of Approvals
Boulevard Jackson Highway, this roadway segment couldbe widened to six lanes. This improvement is proposed in the Sacramento County and the City of Rancho Cordova
General Plans; however, it is not in the 2035 MTP.
lmprovements to this roadway segment must be
implemented by Sacramento County and the City of RanchoCordova. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for
improvements, based on a program established by that
agency to reduce the impacts to Grant Line Road between Kiefer Boulevard and Jackson Highway (Sacramento
County Roadway Segment
8). The identified improvement would more than offset the impacts specifically related to the Folsom South of U.S. 50project on this roadway segment. 3A.154r
(FPASP
ErR/EtS)
Mitigation
Measure
53-66

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR TIONS
FOR N21
No.

Page 450 ends

05/10/2022 Item No.17.
coNDrTroNs oF APPROVAL FOR THE PHASE 1 C SOUTH SUBDTVTSTON (PN 2l-086)

WEST OF SAVANNAH PARKVI'AY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMATL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Planlnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportation
SacramentoCounty
Department of
Transportation
When
Required
Before projectbuild out. A
phasing
analysisshould be
performedprior to
approval of
the first
subdivision
map to
determineduring which
project phase
the
improvement
should be
built.Betore projectbuild out. Aphasing
analysis
should be
performedprior to
approval of
the firstsubdivision
map to
determine
Condition of Approvals
Westbound Ramps (Sacramento County Roadway Segments
12-13).

Participate in Fair Share Funding of lmprovements toReduce lmpacts on White Rock Road between GrantLine Road and Prairie City Road (Sacramento County Roadway Segment 22).

To improve operation on White Rock Road between Grant
Line Road and Prairie City Road, this roadway segment must be widened to six lanes. This improvement is included in the 2035 MTP but is not included in the Sacramento County
General Plan. lmprovements to this roadway segment mustbe implemented by Sacramento County. The identifiedimprovement would more than offset the impacts specificallyrelated to the Folsom South of U.S. 50 project on this roadway segment. However, because of other developmentin the region that would substantially increase traffic levels, this roadway segment would continue to operate at an
unacceptable LOS F even with the capacity improvements
identified to mitigate Folsom South of U.S. 50 impacts. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce theimpacts to White Rock Road between Grant Line Road and Prairie City Road (Sacramento County Roadway Segment
22t.

Participate in Fair Share Funding of Improvements to
Reduce lmpacts
on White Rock Road between Empire Ranch Road and
Carson
Grossrng Road (Sacramento County Roadway Segmenf
28).

To improve operation on White Rock Road between Empire
Ranch Road and Carson Crossing Road, this roadway
segment must be widened to six lanes. lmprovements to this roadway segment must be implemented by SacramentoCounty. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for
improvements, based on a Droqram established bv that
Mitigation
Measure
3A.154m
(FPASP
ErR/ErS)
3A.15-4n(FPASP
ErR/ErS)
No
53-67
53-68

Page 451 ends

05/10/2022 Item No.17.

CONDITIONS OF APPROVAL FOR THE PHASE I C SOUTH SUBDIVISION (PN 2r-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARI(VIIAYAND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR ADMINISTRATIVE MdNIFI.:ATIrINS ANTI STPFFT NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportation.

SacramentoCounty
Department of
Transportation
When
Required
during which
project phase
the
improvement
should be
built.Before project
build out. Aphasing
analysisshould be
performed
prior to
approval of
the first
subdivision
map to
determine
during which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior toapproval of
the firstsubdivision
map to
determineduring which
Condition of Approvals
agency to reduce the impacts to White Rock Road between Empire Ranch Road and Carson Crossing Road (SacramentoCounty Roadway Segment 28).

Participate in Fair Share Funding of lmprovements toReduce lmpacts on the White Rock Road/Carson Crossrng Road lntersection (El Dorado County 1).

To ensure that the White Rock Road/Carson Crossing Road intersection operates at an acceptable LOS, the eastboundright turn lane must be converted into a separate free right turn lane, or double right. lmprovements to this intersection must be implemented by El Dorado County. The applicant
shall pay its proportionate share of funding of improvements tothe agency responsible for improvements, based on a program established by that agency to reduce the impacts to the White Rock Road/Carson Crossing Road lntersection (El Dorado County 1).

Participate in Fair Share Funding of Improvements toReduce lmpacts on the Hazel AvenudU.S. 50 Westhound Ramps
I nters ecti on (Caltra n s
lntersection 1).

To ensure that the Hazel Avenueiu.S. 50 westbound ramps intersection operates at an acceptable LOS, the westbound approach must be reconfigured to consist of one dedicated left turn lane, one shared left through lane and three
dedicated right-turn lanes. lmprovements to this
intersection must be implemented by Caltrans andSacramento County. The applicant shall pay itsorooortionate share of fundinq of imorovements to the Mitigation
Measure
3A.15-4o(FPASP
ErR/ErS)
3A.154p
(FPASP
ErR/ErS)
No.
53-
69 53-70

Page 452 ends

05/10/2022 Item No.17.
coNDtTtoNs oF AppRovAL FoR THE PHASE 1 C SOUTH SUBD|V|S|ON (PN 21-086)

WEST OF SAVANNAH PARKVT'AY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrashucture Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportation.

SacramentoCounty
Department of
Transportation.

When
Required
project phase
the
improvement
should be
built.

Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map todetermineduring which
project phase
the
improvement
should be
built.Before projectbuild out. A
phasinganalysis
should be
performedprior toapproval of
the firstsubdivision
map to
determinedurinq which
Condition of Approvals
agency responsible for improvements, based on aprogramestablished by that agency to reduce the impacts to the Hazel
Avenue/U.S. 50 Westbound Ramps lntersection (Calhans
lntersection 1).

Participate in Fair Share Funding of lmprovements to
Reduce lmpacts on Eastbound US 50 between ZinfandelDrive and Sunrise Boulevard (Freeway Segment 1).

To ensure that Eastbound US 50 operates at an acceptable LOS between Zinfandel Drive and Sunrise Boulevard, an
additional eastbound lane could be constructed. This
improvement is not consistent with the Concept Facility in Caltrans State Route 50 Corridor System Management Plan; therefore, it is not likely to be implemented by Caltrans by 2030. Construction of the Capitol South East Connector, including widening White Rock Road and Grant Line Road to six lanes with limited access, could divert some haffic from U.S. 50 and partially mitigate the project's impact. The applicant shall pay its proportionate share of funding of improvements to the agency responsible for improvements,based on a program established by that agency to reduce theimpacts to Eastbound U.S. 50 between Zinfandel Drive and Sunrise Boulevard (Freeway Segment 1).

Participate in Fair Share Funcling of tmprovements toReduce lmpacts on Eastbound US 50 between Rancho Cordova Parkwayand Hazel Avenue (Freeway Segment 3).To ensure that Eastbound US 50 operates at an acceptable LOS between Rancho Cordova Parkway and Hazel
Avenue, an additional eastbound lane could be
constructed. This improvement is not consistent with theConcept Facility in Caltrans State Route 50 CorridorSystem Management Plan; therefore, it is not likely to be implemented by Caltrans by 2030. Construction of the
Caoitol South East Connector. includino widenino White
Mitigation
Measure
3A.15-4q(FPASP
ErR/ErS)3A.15-4r(FPASP
ErR/ErS)
No.
53-71
53-72

Page 453 ends

05/10/2022 Item No.17.
coNDrloNS OF APPROVAL FOR THE PHASE 1 G SOUTH SUBDIVISION (PN 21486) WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PAR}SI'AYAND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PIANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportation.

When
Reouired
project phase
the
improvement
should be
built.Before project
build out. Aphasing
analysisshould be
performedprior toapproval of
the firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.

Condition of Approvals
Rock Road and Grant Line Road to six lanes with limited access, could divert some traffic off of U.S. 50 and partially mitigate the project's impact. The applicant shall pay itsproportionate share of funding of improvements to theagency responsible for improvements, based on a program established by that agency to reducethe impacts to Eastbound U.S. 50 between Rancho Cordova Parkway and
Hazel Avenue (Freeway Segment 3).

Participate in Fair Share Funding of lmprovements to
Reduce lmpacts
on Eastbound US 50 between Folsom Boulevard andPrairie City Road (Freeway Segment 5).

To ensure that Eastbound US 50 operates at an acceptable LOS between Folsom Boulevard and Prairie City Road, the eastbound auxiliary lane should be converted to a mixed flow lane that extends to and drops at the Oak Avenue Parkway off ramp (see mitigation measure 34.15-4t). lmprovements tothis freeway segment must be implemented by Caltrans. This improvement is not consistent with the Concept Facility inCaltrans State Route 50 Corridor System Management Plan; therefore, it is not likely to be implemented by Caltrans by 2030. Construction of theCapitol South East Connector, including widening White Rock Road and Grant Line Road to six lanes with limited access, could divert some traffic off of U.S. 50 and partially mitigate the project's impact. The
applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or
other appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to Eastbound U.S. 50 between Folsom Boulevard and Prairie City Road
(FreewaySegment 5).

Mitigation
Measure
3A.15-4s
(FPASP
ErR/ErS)
No.
53-73

Page 454 ends

05/10/2022 Item No.17.

CONDITIONS OF APPROVAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 2r-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STPFFT NAMFS
Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

ResponsibleDepartment
SacramentoCounty
Department of
Transportation
SacramentoCounty
Department of
Transportation.

When
Required
Before projectbuild out. A
phasing
analysisshould be
performed
prior to
approval of
the first
subdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before project
build out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map todetermineduring which
project phase
the
improvement
Condition of Approvals
Participate in Fair Share Funding of lmprovements toReduce lmpacts on Eastbound US 50 between Prairie City Road and Oak Avenue Parkway (Freeway Segment6).

To ensure that Eastbound US 50 operates at an acceptable LOS between Prairie City Road and Oak Avenue Parkway,
the northbound Prairie City Road slip on ramp should merge with the eastbound auxiliary lane that extends to and drops at the Oak Avenue Parkway off ramp (see
Mitigation Measures 3A.15-4u, v and w), and the southboundPrairie City Road flyover on ramp should be braided over the Oak Avenue Parkway off ramp and start an extended fullauxiliary lane to the East Bidwell Street - Scott Road off ramp. lmprovements to this freeway segmentmust be implemented by Caltrans. The applicant shall pay itsproportionate share of funding of improvements, as may be determined by a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce the impacts to Eastbound U.S. 50 between Prairie City Road and Oak
Avenue Parkway (Freeway Segment 6).

Participate in Fair Share Funding of lmprovements to
Reduce lmpacts on fhe U.S. 50 Eastbound / Prairie City
Road Strp Ramp Merge (Freeway Merge 6).

To ensure that Eastbound US 50 operates at an acceptable LOS, the northbound Prairie City Road slip on ramp should start the eastbound auxiliary lane that extends to and dropsat the Oak Avenue Parkway off ramp (see mitigation measure 3A.15-4u, w and x), and the southbound Prairie
City Road flyover on ramp should be braided over the Oak Avenue Parkway off ramp and start an extended full auxiliary lane to the East Bidwell Street - Scott Road off ramp.
lmprovements to this freeway segment must be implemented by Caltrans. The applicant shall pay its proportionate share of funding of improvements, as may be determined
by a nexus study or other appropriate and reliable mechanismpaid for bv applicant, to reduce the impacts to the U.S. 50 Mitigation
Measure
3A.15-4t
(FPASP
ErR/ErS)

34.15-4u(FPASP
ErR/ErS)
No.
53-
74 53-75

Page 455 ends

05/10/2022 Item No.17.

Condition will be
satisfied prior to
issuance of a
building permit.

Conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

SacramentoCounty
Department of
Transportation
Responsible
Department
SacramentoCounty
Department of
Transportation
Before projectbuild out. A
phasing
analysisshould be
performedprior toapproval of
the firstsubdivision
map to
determineduring which
project phase
the
imorovement
When
Required
should be
built.Before projectbuild out. A
phasing
analysisshould be
performed
prior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.

Participate in Fair share Functing of lmprovements toReduce lmpacts on U.S. 50 Eastbound / Oak Avenue Parkway Loop Ramp
Merge
(Freeway Merge Q.f o ensure that Eastbound US 50operates at an acceptable LOS, thesouthbound Oak Avenue Parkway loop on ramp should merge with the eastbound auxiliary lane that starts at the southbound Prairie City Road braided flyover on ramp andends at the East Bidwell Street - Scott Road off ramp (see mitigation measure 34.15-4u, v and w). lmprovements to this freeway segment must be implemented by Caltrans. The
applicant shall pay its proportionate share of funding of improvements, as may be determined by a nexus study or
other appropriate and reliable mechanism paid for byapplicant, to reduce the impacts to U.S. 50 Eastbound / Oak Participate in Fair Share Funding of lmprovements to
Reduce lmpacts on the U.S. 50 Eastbound / Prairie City
Road Flyover On Ramp to Oak Avenue Parkway OffRamp Weave (Freeway Weave 7).

To ensure that Eastbound US 50 operates at an acceptable LOS, the northbound Prairie City Road slip on ramp should start the eastbound auxiliary lane that extends to and drops at the Oak Avenue Parkway off ramp (see mitigation
measure 3A.15-4u, v and x), and the southbound Prairie CityRoad flyover on ramp should be braided over the Oak Avenue Parkway off ramp and start an extended full auxiliary lane to the East Bidwell Street - Scott Road off ramp.
lmprovements to this freeway segment must be implemented by Caltrans. The applicant shall pay its proportionate share of funding of improvements, as may be determined
by a nexus study or other appropriate and reliable mechanismpaid for by applicant, to reduce the impacts to the U.S. 50 Eastbound i Prairie City Road Flyover On Ramp to Oak
Avenue Parkway Off Ramp Weave (Freeway Weave 7).

Condition of Approvals
Eastbound / Prairie City Road slip ramp merge (FreewayMerge 6). 3A.15-4w
(FPASP
ErR/ErS)
3A.15-4v(FPASP
ErR/ErS)
Mitigation
Measure
53-
77 WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT'DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADM TIVE AND STREET
PHASE 1 C
No.
53-76

Page 456 ends

05/10/2022 Item No.17.

CONDITIONS OF APPROVAL FOR THE PHASE 1 G SOUTI.I suBDrvrsroN (PN 21 -086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PIANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
conditioned
Satisfied
Condition will be
satisfied prior to
issuance of a
building permit.

Condition will be
satisfied prior to
issuance of a
building permit.

Comments
This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrashucture Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collectedprior to building permit issuance in this subdivision This subdivision will pay its fair share of the following improvements with the payment of Specific Plan
lnfrastructure Fees (SPIF), City Traffic lmpact Fees and Sacramento County Wide Transportation fees collected
prior to building permit issuance in this subdivision.

Responsible
Department
SacramentoCounty
Department of
Transportation.

SacramentoCounty
Department of
Transportation
When
Required
should be
built.Before projectbuild out. A
phasing
analysis
should be
performedprior to
approval ofthe firstsubdivision
map to
determineduring which
project phase
the
improvement
should be
built.Before projectbuild out. Aphasing
analysisshould be
performedprior to
approval ofthe firstsubdivision
map todetermineduring which
project phase
the
improvement
condition of Approvals
Avenue Parkway Loop Ramp Merge (Freeway Merge 8).

Participate in Fair Share Funding of lmprovements to
Reduce lmpacts on U.S. 50 Westbound / Empire RanchRoad Loop Ramp Merge (Freeway Merge 27).

To ensure that Westbound US 50 operates at an acceptable LOS, the northbound Empire Ranch Road loop on ramp
should start the westbound auxiliary lane that ends at the East Bidwell Street - Scott Road off ramp. The slip-on ramp from southbound Empire Ranch Road slip ramp would merge into this extended auxiliary lane. lmprovements to this freeway segment must be implemented by Caltrans. The
applicant shall pay its proportionate share of funding of improvements, as may be determinedby a nexus study or other appropriate and reliable mechanism paid for by applicant, to reduce the impacts to the U.S. 50 Westbound / Empire Ranch Road loop ramp merge (Freeway
Merge 27).

Participate in Fair Share Funding of Improvements toReduce Impacts on U.S, 50 Westbound / Prairie City Road Loop RampMerge (FreewayMerge 35).

To ensure that Westbound US 50 operates at an acceptable LOS, the northbound Prairie City Road loop on ramp should start the westbound auxiliary lane that continues beyond the Folsom Boulevard off ramp. The slip-on ramp from
southbound Prairie City Road slip ramp would merge into thisextended auxiliary lane. lmprovements to this freewaysegment must be implemented by Caltrans. The applicantshall pay its proportionate share of funding of improvements,as may be determined by a nexus study or other appropriate and reliable mechanismpaid for by applicant. to reduce the imoacts to the U.S. 50 Westbound / Mitigation
Measure
3A.15.4x
(FPASP
ErR/ErS)
3A.15-4y(FPASP
ErR/ErS)
No.
53-7B
53-79

Page 457 ends

05/10/2022 Item No.17.
coNDtTtoNs oF APPROVAL FOR THE PHASE I C SOUTH SUBDIVISION (PN 2r-086)

WEST OF SAVANNAH PARI(WAY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied

UTILITIES AND SERVICE SYSTEMS
YesYesYes
Comments
The Phase 1 Sanitary Sewer infrastructure including the off-site sewer trunk main, the Alder Creek Parkwaysewer lift station and forced main to serve thissubdivision have been constructed by the FPA landowners and have been completed and accepted by
the City and are currently in operation.The City obtained a letter from Regional San which provides verification that there is adequate capacity in the existing Regional San conveyance and treatmentsystem to accommodate the entire Folsom Plan Area at buildout. Confirmation from Regional San was requiredbecause the Folsom Plan Area is served by the existing Regional San Lift Station on lron Point Road. The City
Sewer Lift Station and Forced Main which connects to
the Regional San Lift Station has been accepted by the
City and is currently in operation.

The owneriapplicant has constructed the necessary
infrastructure to provide potable water to the
subdivision. The potable Phase 1 water infrastructure
Responsible
Department
City of FolsomCommunity
DevelopmentDepartmentCity of FolsomCommunity
DevelopmentDepartment
City of FolsomCommunity
When
Required
should be
built.Before
approval of
final maps
and issuanceof building
permits for
any project
phases.Before
approval of
final maps
and issuance
of building
permits forany projectphases.Before
approval of
final maps
Condition of Approvals
Prairie City
Road Loop Ramp Merge (Freeway Merge 35).

Submit Proof of Adequate On- and Off-Site
Wastewater Conveyance Facilities and Implement Onand Off-Site Infrastructure Service Sysfems or Ensure That Adequate Financing ls Secured.

Before the approval of the final map and issuance of building permits for all project phases, the project applicant(s) of all project phases shall submit proof to the City of Folsom that an adequate wastewater conveyance system either has beenconstructed or is ensured through payment of the City's facilities augmentation fee as described under the Folsom Municipal Code Title 3, Chapter 3.40, "Facilities AugmentationFee - Folsom South Area Facilities Plan," or other sureties to the City's satisfaction. Both on-site wastewater conveyance infrastructure and off- site force main sufficient to provide adequate service to the project shall be in place for theamount of development identified in the tentative map beforeapproval of the final map and issuance of building permits forall project phases, or their financing shall be ensured to thesatisfaction of the City.

Demonstrate Adequate sRwfP wastewater freatment
Capacity.

The project applicant(s) of all project phases shall
demonstrate adequate capacity at the SRWTP for new
wastewater flows generated by the project. This shall involve preparing a tentative map-level study and paying connection and capacity fees as identified by SRCSD. Approval of the final map and issuance of building permits for all project phases shall not be granted until the City verifies adequate SRWTP capacity is available for the amount of development identified in the tentative map.

Submit Proof of Surface Water Supply Availability.
a. Prior to approval of any smallJot tentative subdivision mapsubiect to Government Code Section 66473.7 (SB 221), the Mitigation
Measure
3A.16.1(FPASP
ErR/ErS)
3A.16-3
(FPASP
ErR/EtS)
3A.18-1
(FPASP
ErR/ErS)
No
53-
80 53-8153-82

Page 458 ends

05/10/2022 Item No.17.
ffioR THE pHAsE I c sourH suBDlvlsloN (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARTQVAYAND NORTH OF WHITE ROCK

SMALL-IOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFIGATIONS AND STREET NAMES
Conditioned
Satisfied
Yes
Comments
for the Folsom Plan Area has been reviewed, approved
and accepted by the City and is currently in operation.

The off-site potable water infrastructure to serve thesubdivision has been reviewed, approved and accepted by the City and is currently in operation. ln addition, theCity has verified that the off-site potable water infrastructure is adequate to serve the subdivision.

ResponsibleDepartment
DevelopmentDepartment
City of FolsomCommunity
DevelopmentDepartment
When
Required
and issuanceof building
permits for
any project
phases.

Before
approval of
final maps
and issuanceof building
permits for
any project
phases.

Condition of Approvals
City shall comply with that statute. Prior to approval of any small-lot tentative subdivision map for a proposed residential project not subject to that statute, the City need not comply with Section 66473.7, or formally consult with any publicwater system that would provide water to the affected area; nevertheless, the City shall make a factual showing orimpose conditions similar tothose required by Section 66473.7 to ensure an adequate water supply for
development authorized by the map.
b. Prior to recordation of each final subdivision map, or prior to City approval of any similar project-specific discretionaryapproval or entitlement required for nonresidential uses, the project applicant(s) of that project phase or activity shalldemonstrate the availability of a reliable and sufficient watersupply from a public water system for the amount ofdevelopment that would be authorized by the finalsubdivision map or project-specific discretionary nonresidential approval or entitlement. Such a demonstrationshall consist of information showing that both existingsources are available or needed supplies and improvements will be in place prior to occupancy.

Submit Proof of Adequate Off-Site Water ConveyanceFacilities and lmplement Off-Site lnfrastructureService System or Ensure That Adequate Financing ls Secured.

Before the approval of the final subdivision map andissuance of building permits for all project phases, theproject applicant(s) of any particular discretionary development application shall submit proof to the City of Folsom that an adequate off-site water conveyance system either has been constructed or is ensured or other suretiesto the City's satisfaction. The off-site water conveyance infrastructure sufficient to provide adequate service to theproject shall be in place for the amount of development identified in the tentative map before approval of the final subdivision map and issuance of buildinq permits for all Mitigation
Measure
3A.18-2a(FPASP
ErR/ErS)
No.
53-
B3

Page 459 ends

05/10/2022 Item No.17.

CONDITIONS OF APPROVAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 21.086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINIPARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
YesYes
Comments
This condition is not applicable to this subdivision. Thewater supply for this subdivision is provided by the City of Folsom Water Treatment Plant rather than an OffSite Water Treatment Plant The City and its Environmental Compliance Consultant
(Helix) have reviewed all MMRP conditions and verified
compliance with this Mitigation Measure. Compliance
was verified prior to commencement of grading and
construction in Fall of 2021. Compliance table is on file with the City.

Responsible
Department
Gity of Folsom
Community
Development
Department
City of Folsom
Community
Development
Department
When
Required
Before
approval of
final maps
and issuanceof building
permits for
any project
phases.Before
approval ofgrading or
improvementplans or any
grounddisturbingactivities,
including
grubbing orclearing, for
Condition of Approvals
project phases, or their financing shall be ensured to the satisfaction of the City. A certificate of occupancy shall not be issued for any building within the SPA until the water conveyance infrastructure sufficient to serve such building has
been constructed and is in place.

Demonstrate Adequate Otr-Stte Water Treatment Capacity (if the Otf- $ite Water Treatment Piant Option is Se/ected).
lf an off-site water treatment plant (WTP) alternative is selected (as opposed to the on-site WTP alternative), the project applicant(s) for any particular discretionary
development application shall demonstrate adequate
capacity at the off-site WTP. This shall involve preparing a tentative map-level study and paying connection and
capacity fees asdetermined by the City. Approval of the final project map shall not be
granted until the City verifies adequate water treatmentcapacity either is available or is certain to be available when needed for the amount of development identified in the
tentative map before approval of the final map and issuance of building permits for all project phases. A certificate ofoccupancy shall not be issued for any building within the SPA until the water treatment capacity sufficient to serve suchbuilding has been constructed and is in place.

Conduct Environmental Awareness Training for Construction Employees.

Prior to beginning construction activities, the Project Applicant shall employ a qualified biologist to develop and conductenvironmental awareness training for constructionemployees. The training shall describe the importance ofonsite biological resources, including special-status wildlife habitats; potential nests of special-status birds; and roostinghabitat for special-status bats. The biologist shall also explain the importance of other responsibilities related to the protection of wildlife durinq construction such as inspectinq open trenches and Mitigation
Measure
3A.18-2b(FPASP
ErR/ErS)

4.4-1(Westland
I
Eagle
sPA)
No.
53-8453-85

Page 460 ends

05/10/2022 Item No.17.

GUNUI I I(JNii (JI- AI.IJI{UVAL FUl{ IlItr.FIlADtr I C SOUTH SUBDTVISION (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STPFFT NAMFS
Conditioned
Satisfied
Yes
Yes
Comments
The City and its Environmental Compliance Consultant
(Helix) have reviewed all MMRP conditions and verified
compliance with this Mitigation Measure. Compliance
was verified prior to commencement of grading and
construction in Fall of 2021. Compliance table is on file with the City.

The City and its Environmental Compliance Consultant
(Helix) have reviewed all MMRP conditions and verified
compliance with this Mitigation Measure. Compliance
ResponsibleDepartment
California
Department of
Fish and Game,
and City of
Folsom CDDCity of FolsomCDD; U.S. Army
When
Required
any project
phase.

Before
approval ofgrading or
improvementplans or any
ground
disturbingactivities,
including
grubbing orclearing, forany project
phase.

During all
construction
phases
Condition of Appiovals
looking under vehicles and machinery prior to moving them to ensure there are no lizards, snakes, small mammals, or other wildlife that could become trapped, injured, or killed in conshuction areas or
under equipment.

The environmental awareness program shall be provided to all construction personnel to brief them on the life history ofspecial-status species in or adjacent to the project area, the need to avoid impacts on sensitive biological resources, any terms and conditions required by State and federal agencies, and the penalties for not complying with biological mitigation requirements. lf new construction personnel are added to theproject, the contractor's superintendent shall ensure that thepersonnel receive the mandatory training before starting work.

An environmental awareness handout that describes and
illustrates sensitive resources to be avoided during project construction and identifies all relevant permit conditions shall be provided to each person.

Preconstruction i/eslrng Bird S u rvey.

The Project Applicant shall conduct a preconstruction nesting bird survey of all areas associated with construction activities on the project site within 14 daysprior to commencement of construction during the nesting season (1 Februarythrough 31 August)- lf active nests are found, a no-disturbance buffer around the nest shall be established. The buffer distance shall be established by a qualified biologist in consultation with CDFW. The buffer shall be maintained until the fledglingsare capable of flight and become independent of the nest, to be determined by a qualified biologist. Once the young areindependent ofthe nest, no further measures are necessaryPre- construction nesting surveys are not required for construction activity outside of the nesting season.

Comply with the Programmatic Agrement.

The PA for the project is incorporated by reference. The PA provides a management framework for identifying historic Mitigation
Measure

4.4-7
(Westland
I
Eagle
sPA)
3A.5-1a(Westland
I
No
53-B6
53-
87

Page 461 ends

05/10/2022 Item No.17.

GONDITTONS OF APPROVAL FORTHE PHASE 1 C SOUTH SUBDIVISION (PN 21-086) WEST OF SAVANNAH PAR}OI'AY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK

SMALL-LOTVESTING TENTATIVE SUBDIVISION MAP, PIANNED DEVELOPMENT PERMIT- DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
satisfied
Yes
Comments
was verified prior to commencement of grading and
construction in Fall of 2O21. Compliance table is on file with the City.

The City and its Environmental Compliance Consultant
(Helix) have reviewed all MMRP conditions and verified
compliance with this Mitigation Measure. Compliance
was verified prior to commencement of grading and
construction in Fall of 2021. Compliance table is on filewith the City.

Responsible
Department
Corp of
Engineers
City of Folsom
CDD; U.S. ArmyCorp of
Engineers
When
Required
Before
approval ofgrading or
improvementplans or anygrounddisturbingactivities,
including
grubbing orclearing, for
any project
phase.

Condition of Approvals
properties, determining adverse effects, and resolving thoseadverse effects as required under Section 106 of the National Historic Preservation Act. This document is incorporated byreference. The PA is available for public inspection and review at the California Office of Historic Preservation 1725 23rd Street Sacramento. CA 95816.

Conduct Con struction Personnel Education, Conduct On-Site Monitorinu lfReouired.-Stoo Work if Cultural Resources are Discovered, Asiess the Significance of the Find, and Perform Treatmeint or Avoidance as Required.

To reduce potential impacts to previously undiscovered cultural resources, the project applicant(s) of all project phases shall do the following:

Before the start of ground-disturbing aclivities, the projectapplicant(s) of all project phases shall retain a qualifiedarchaeologist to conduct haining for construction workers as necessary based upon the sensitivity of the project APE, toeducate them about the possibility of encountering buriedcultural resources and inform them of the proper proceduresshould cultural resources be encountered.

As a result of the work conducted for Mitigation Measures 34.5-1a and
3A.5-1b, if the archaeologist determines that any portion of the SPA or the off-site elements should be monitored for potential discovery of as-yet- unknown cultural resources, the project applicant(s) of all project phases shall implementsuch monitoring in the locations specified bythearchaeologist. USACE should review and approve any recommendations by
archaeologists with respect to monitoring.Should any cultural resources, such as structural features, unusual amounts of bone or shell, artifacts, or architecturalremains be encountered during any construction activities, work shall be suspended in the vicinity of the find and the aporopriate oversiqht aqencv(ies) (identified below) shall be Mitigation
Measure
Eagle
sPA)
3A.5-2
(Westland
I
Eagle
sPA)
No.
53-8B

Page 462 ends

05/10/2022 Item No.17.

GONDTTTONS OF APPROVAL FOR THE PHASE 1 G SOUTH SUBD|V|SION (PN 21-066)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PI-ANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Responsible CommentsDepartment
When
Required
Condition of Approvals
notified immediately. The appropriate oversight agency(ies) shall retain a qualified archaeologist who shall conduct a field investigation of the specific site and shall assess the significance of the find by evaluating the resource for eligibilityfor listing on the CRHR and the NRHP. lf the resource is eligible for listing on the CRHR or NRHP and it would besubject to disturbance or destruction, the actions required in Mitigation Measures 3A.5-1a and 3A.5-
1b shall be implemented. The oversight agency shall be
responsible for approval of recommended mitigation if it is determined to be feasible in lightof the approved land uses and shall implement the approved mitigation
before resuming construction activities atthe archaeologicalsite.

Mitigation for the off-site elements outside of the City of Folsom's jurisdictional boundaries must be coordinated by the project applicant(s) of each applicable project phase with the affectedoversight agency(ies) (i.e., El Dorado and/or Sacramento Counties,or Caltrans).

The project applicant, in coordination with USACE, shall ensure that an archaeological sensitivity training program is developed and implemented during a pre-constluction meeting for construction supervisors. The sensitivity training program shall provide information about notification procedures when potential archaeological material is discovered, procedures for coordination between construction personnel and monitoring personnel, andinformation about other treatment or issues that may arise if culturalresources (including human remains) are discovered during project construction. This protocol shall be communicated to all new construction personnel during orientation and on a poster that is placed in a
visible location inside the construction job trailer, The phone number of the USACEcultural resources staff member shall also be included.The on-site sensitivity haining shall be carried out each time a newcontractor will beqin work in the APE and atthe beoinnino of Mitigation
Measure
No

Page 463 ends

05/10/2022 Item No.17.
coNDtTtoNs oF APpRovAL FOR THE PHASE 1 C SOUTH SUBDIVISION (PN 2r-086)

WEST OF SAVANNAH PARKIA'AY, SOUTH OF MANGINI PARKWAY AND NORTH OF WHITE ROCK sMALL-LorvEslNG rENrArrvE suBDrvrsroN ror,tsilnTr:3r"r11ti3il[.#L3Ii,H,,l;TJrtSHg#l^.JtNDARD DEVrAfloNs AND DESTGN REVTEW AND MrNoR Conditioned
Satisfied
Yes
Comments
The City and its Environmental Compliance Consultant
(Helix) have reviewed all MMRP conditions and verified
compliance with this Mitigation Measure. Compliance
was verified prior to commencement of grading and
construction in Fall of 2021. Compliance table is on file with the City.

No human remains have been encountered in the
subdivision durino oradino and construction
Responsible
Department
SacramentoCounty Coroner;
Native AmericanHeritage
Commission;City of FolsomCDD
When
Required
During all
ground
disturbingactivities, forany projectphase.

Condition of Approvals
each construction season by each contractor.lf unanticipateddiscoveries of additional historic properties, defined in 36 CFR800.16 (l), are made during the construction of the project, the USACE shall ensure that they will be protected byimplementing the following measures:

The Construction Manager, or archaeological monitor, if given the authority to halt construction activities, shall ensure that work in that area is immediately halted within a 1OOJoot radius of the unanticipated discovery until the find is examined by a person meeting the professional qualifications standardsspecified in Section 2.2 of Attachment G of the HPMP. TheConstruction Manager, or archaeological monitor, if present,shall notify the USACE within 24 hours of the discovery.

The USACE shall notify the State Historic Preservation Officer (SHPO) within one working day of an unanticipated discoveryand may initiate interim treatment measures in accordance with this HPTP. Once the USACE makes a formal
determination of eligibility for the resource, the USACE will notify the SHPO within 48 hours of the determination and afford the SHPO an opportunity to comment on appropriate lreatment. The SHPO shall respond within 72 hours of the request to consult. Failure of the SHPO to respond within 72hours shall not prohibit the USACE from implementing the heatment measures.

The project applicants shall be required to submit to the City proof of compliance in the form of a completed training roster and copy of training materials.Suspend Ground-Disturbing Activities if Human Remains are Encountered and
Complywith Califomia Health and Safety Code Procedures.ln accordance with the California Health and Safety Code, if humanremains are uncovered during ground-disturbing activities,including those associated with off-site elements, the project applicant(s) of all project phases shall immediately halt all grounddisturbing activities in the area of the find and notify the Mitigation
Measure
3A.5-3
(Westland
I
Eagle
sPA)
No.
53-89

Page 464 ends

05/10/2022 Item No.17.
coNDITtONS OF APPROVAL FOR THE PHASE 1 C SOUTH SUBDTVTSTON (PN 21-066)

WEST OF SAVANNAH PARI(VI'AY, SOUTH OF MANGINI PARKWAYAND NORTH OFWHITE ROCK SMALL.LOTVESTING TENTATIVE SUBDIVISION MAP, PI.ANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STREET NAMES
Conditioned
Satisfied
Responsible Comments
Department
When
Required
Condition of Approvals
Sacramento County Coroner and a professional archaeologistskilled in osteological analysis to determine the nature of the remains. The coroner is required to examine all discoveries ofhuman remains within 48 hours of receiving notice of a discovery on private or public lands (California Health and Safety CodeSection 7050.5[b]). lf the coroner determines that the remains arethose of a Native American, he or she must contact the NAHC by phone within24 hours of making that determination (California Health and Safety Code
Section 7050[c]).

After the coroner's findings are complete, the project applicant(s), an archaeologist, and the NAHC-designated Most Likely Descendantshall determine the ultimate treatment and disposition of the remains and take appropriate steps to ensure that additional humaninterments are not disturbed. The responsibilities for acting onnotification of a discovery of Native American human remains are identified in Section 5097.9 of the California Public Resources Code.Upon the discovery of Native American remains, the procedures above regarding involvement of the applicable county coroner, notification of the NAHC, and identification of an Most LikelyDescendant shall be followed. The project applicant(s) of all projectphases shall ensure that the immediate vicinity (according to generally accepted cultural or archaeological standards and practices) is not damaged or disturbed by further development activity until consultation with the Most Likely Descendanl has taken place. The Most Likely Descendant shall have 48 hours after being granted access to the site to inspect the site and makerecommendations. A range of possible treatments for the remainsmay be discussed: nondestructive removal and analysis,preservation in place, relinquishment of the remains and associateditems to the descendants, or other culturally appropriate heatment.

As suggested by AB 2641 (Chapter 863,Statutes of 2006), the concerned parties may extend discussions beyond the initial
4B hours to allow for the discovery of additional remains. AB 2641(e) includes a list of site protection measures and states thatthe oroiect aoolicant(s) shall complv with one or more of the Mitigation
Measure
No

Page 465 ends

05/10/2022 Item No.17.

CONDITIONS oF APPROVAL FORTHE PHASE I C SOUTH SUBDIVISION (PN 21-086)

WEST OF SAVANNAH PARKWAY, SOUTH OF MANGINI PARIOIIAYAND NORTH OF WHITE ROCK SMALL.LOT VESTING TENTATIVE SUBDIVISION MAP, PLANNED DEVELOPMENT PERMIT. DEVELOPMENT STANDARD DEVIATIONS AND DESIGN REVIEW, AND MINOR

ADMINISTRATIVE MODIFICATIONS AND STPFFT NAMFS
Condhioned
Satisfied
Responsible Comments
Department
When
Required
Condition of Approvals
following requirements:
record the site with the NAHC or the appropriate lnformation Center, use an open-space or conservation zoning designation oreasement, or record a reinternment document with the county.

The project applicant(s) or its authorized representative of all project phases shall rebury the Native American human remains and associated grave goods with appropriate dignity on the property in a location nol subiect to further subsurface disturbance if the NAHCis unable to identify an Most Likely Descendant or if the Most Likely Descendant fails to make a recommendation within 48 hours afterbeing granted access to the site. The project applicant(s) or its authorized representative may also reinter the remains in a location not subject to further disturbance if it rejects the recommendation of the Most Likely Descendant and
Mitigation
Measure
No

Page 466 ends

05/10/2022 Item No.17.

Folsom City Council
Staff ort

RECOMMENDATION/CITY COUNCIL ACTION
Move to deny the appeal by Igor Semenyuk of a Decision by the Historic District Commission Denying a Conditional Use Permit for the Lakeside Memorial Lawn Crematorium project (PN 19-182) located atl20l Forrest Street.

BACKGROUND
The Lakeside Memorial Lawn located at I20l Forrest Street has been in operation since the lgth century and represents a combination of several old Folsom cemeteries, including the Masonic, Odd Fellows, Jewish, Citizen's, and Cook's cemeteries. It is adjacent to the Chung Wah cemetery to the south, dredge mining tailings to the east, the Folsom Lake State Recreation Area and American River to the west and the PreservelLake Natoma Shores subdivision to the north.

The Lakeside Cemetery (including the Odd Fellows and Mason's Cemeteries) and the adjacent Chung Wah Cemetery and mining tailings all appear on the City of Folsom's Cultural Resources Inventory list and the Lakeside Memorial Lawn and Chung Wah cemeteries were both designated as "historic" by the Sacramento County Board of Supervisors and Cemetery Advisory Commission. The Chung Wah Cemetery is also listed on the National Register of Historic Places.
1 MEETING DATE: slt0l2022
AGENDA SECTION: Public Hearing
SUBJECT: Appeal by Igor Semenyuk of a Decision by the Historic District Commission Denying a Conditional Use Permit for the Lakeside Memorial Lawn Crematorium project (PN 19-182) located at 1201 Fonest Street
FROM: C ommunity Development Department

Page 467 ends

05/10/2022 Item No.18.

The Planning Commission approved a Use Permit and Variance for Mausoleums at Lakeside Memorial Lawn in 1991 (PC9l-042). An amendment to the approval was granted in 1995 (PC95-033). That approval allowed for the construction of twelve mausoleums. To date, two mausoleums have been built.
1n2002, Lorin Claney applied for a Conditional Use Permit (CUP) for a crematorium at the Lakeside Memorial Lawn (PN 02-253). Staff prepared a Draft Initial StudyAvlitigated Negative Declaration (IS/MND) for the project and routed it for public review. Staff received several comments from the public and from the Sacramento County Cemetery Advisory Commission recommending denial of the project.

While no formal air quality or cultural resources studies were done as part ofthe 2002 IS/MND, staff prepared a staff report for the Historic District Commission recommending denial of the project in 2003 on the grounds that the letter from the Cemetery Advisory Commission stated that the crematorium would have a negative impact on the historical character of the existing cemetery and historical use of the area. The staff report stated that, based on the Cemetery Advisory Commission letter, the conglomeration of historic cemeteries, combined with the tailings, create a rare combination of unique cultural resources that will be impacted by the proposal, that acrematorium is not a use consistent with a historic cemetery, and that approval of a CUP for a contemporary use such as a crematorium would jeopardize the eligibility status of the site as an historic cemetery by the County. Because the staff report recommended denial, the CEQA analysis was not included in the staff report since CEQA does not apply to projects which a public agency rejects or disapproves.

Prior to the scheduled public hearing, the applicant withdrew the application based on costs associated with preparing additional environmental analysis for air quality and cultural resources studies. The Historic District Commission did not review or consider the project proposed in2003, including the CUP application or the associated IS/MND.

An existing maintenance building, approximately 1,071 square feet in area (where the crematorium is proposed), is located along the south border of the cemetery. The design review application for a second 1,600-square-foot maintenance shed was approved by the Historic District Commissionin2l2} (PN 20-160) and the shed was subsequently constructed.

On May 16,2019, the applicant (Igor Semenyuk) submitted a development application for approval of a Conditional Use Permit for operation of a crematorium inside the Miller Funeral Home located at 507 Scott Street. In coordinating with the Sacramento Metropolitan Air Quality Management District (SMAQMD), the applicant determined that a crematorium at this location would not be feasible. The applicant then proposed to perform alkaline hydrolysis (liquid cremations) at this location that would not employ any burning or produce emissions but instead would produce a liquid effluent that would be flushed down sewage pipes. While this method of cremation was approved in California in 2017 , City Environmental and Water 2Page 468
05/10/2022 Item No.18.

Resources stafi in coordination with the Sacramento Regional County Sanitation District, did not have enough local examples of the impacts of these effluents to support this proposal. The applicant subsequently proposed to locate the crematorium in the Lakeside Memorial Lawn in the same metal structure in which it was proposed in2003.

The proposed project includes the installation of one HCT Apex-250 crematory (manufactured by Hartwick Combustion) within an existing metal structure. The roof of the structure would be cut open to accommodate this device, but the structure's footprint would not be expanded.

In addition, a l0-foot-wide by l5-foot-wide walk-in cooler would be installed inside the structure to provide temporary, short-term storage of human remains prior to cremation. Two 25O-gallon propane tanks would be installed on a concrete pad along the northern side of the structure to provide power for the crematorium, as no gas lines currently exist on the property.

The concrete pad covers approximately 38.3 square feet of ground. An exhaust stack would be installed on the roof of the metal structure approximately 19.5 feet from finished grade. The applicant proposes up to four cremations per day and expects that the total will not exceed 500 cremations per year. Average cremation time is approximately 90 minutes. One to two employees would be present to operate the crematorium during the cremation process. Existing parking spaces would be utilized to accommodate employees and visitors.

If the CUP is approved, the project is also required to obtain an authority to construct permit to operate (NC, PTO) from SMAQMD before the crematory can be installed and operated. As part ofthat process, the applicant would be required to provide analysis to ensure the crematory will meet all air district rules/regulations and significance thresholds during the air district's A/C, PTO application and review process. In the event the air district's refined health risk assessment analysis shows that cancer risk or hazard index numbers exceed the significance thresholds noted, further restrictions to the crematorium would be required by SMAQMD before they would issue the A/C, PTO. All crematoriums in Sacramento County are also subject to regular inspections by SMAQMD, which investigates all public complaints about the facilities and fines all facilities for any violations.

Based on the potential for the project to impact nearby residences and cultural resources, staff had an environmental study, called an Initial Study (IS), prepared. Staff retained HELIX Environmental Planning, Inc. to prepare the study, including a full Air Quality and Greenhouse Gas Emissions Assessment. HELIX also hired ECORP Consulting to prepare a Cultural Resources Inventory Report that informed the environmental conclusions regarding cultural and tribal resources. As a result of the Initial Study, a Mitigated Negative Declaration (lvIND) was prepared by HELIX and that environmental document found that all environmental impacts related to the project would be less than significant with mitigation. The IS/MND is included as an appendix within Attachment 2 of this staff report.

After the IS/MND had been made public, staff prepared a staff report recommending approval of the proposed CUP and IS/MND to the Historic District Commission (provided in Attachment 2).ln the staff report, staff noted that with the rigorous analysis of air quality and J Page 469
05/10/2022 Item No.18.
cultural resources provided in the new IS/MND, staff determined that the project would not be detrimental to the health, safety, peace, morals, comfort and general welfare ofpersons residing or working in the neighborhood or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the city, as the proposed project would not have negative impacts to nearby commercial or residential uses that have not been mitigated.

Notice of the IS/MND publication and the public hearing in front of the Historic District Commission were placed in the Sacramento Bee and mailed to property owners within 300 feet ofthe subject property.

During the life of the project application, staff received directly or was forwarded over 120 unique public comments regarding the project and/or the environmental document, the vast majority of which expressed concerns about the project and the environmental document. Also submitted to staff were an online petition with over 160 signatures, a hand-signed petition with almost 500 signatures, and over 300 signed form letters all expressing opposition to the proposed project. Staff included these letters and petitions as part of the staff report and made them available to the public, the Historic District Commissioners, and the applicant. Staff also summarized each of the unique points made in the public comments in the staff report and HELIX provided a response letter to the general points that were made in several of the letters regarding environmental issues addressed in the IS/MND. All of the comment letters were provided to the Historic District Commission for their consideration (included as part of Attachment 2 to this staff report) at the February 16,2022 meeting. Comments received after the publication of the staff report are included in Attachment 3 of this staff report.

The individuals who were opposed to the proposed project voiced concems regarding a number of topics including the following:
o Concerns regarding air quality emissions and the data used in the Air Quality and Greenhouse Gas Emissions Assessment;
o Concerns regarding traffic, circulation and parking;
o Concerns regarding wildfire and life safety in case of fire caused by the crematorium; o Cultural and archaeological concerns regarding the impact of the crematory machine on nearby cultural resources and burial sites
o Concerns regarding the appropriateness of the land use (a crematorium) in the Historic District;
o Aesthetic concerns regarding the height and design of the stack and impacts to views from nearby cultural resources and residences;
o Whether members of the public could be present at cremations; o Differences in the conclusions of the 2003 and2022 slaff reports for the crematorium; o Concerns regarding the potential decrease in property values ofnearby residences due to the presence of the crematorium; and
o Psychological effects of nearby residences being located near acrematorium. 4

Page 470 ends

05/10/2022 Item No.18.

After publication of the staff report, staff received six additional public comment letters that were added to the record. Included in those comments were two letters from individuals belonging to the Sacramento County Cemetery Advisory Commission. The Chair of the Cemetery Advisory Commission reiterated the points that were made by the group in 2003, stating that construction of a crematorium would be inappropriate near the sunounding cultural resources of historic importance. The Chair also provided evidence thatthe Lakeside Cemetery and Chung Wah Cemetery were listed for historical designation by the County. Another member of the Cemetery Advisory Commission wrote a letter stating that the proposed crematorium could threaten the nomination of the Young Wo Cemetery and that construction of the crematorium could adversely affect the historic features and burials of those buried nearby. HELIX provided a topical response to these comments prior to the hearing. This memorandum has been included in Attachment 4 of this staff report.

The Historic District Commission reviewed the Lakeside Memorial Lawn Crematorium project at its February 16,2022 meeling. At this meeting, 36 individuals (mostly residents of the PreservelLake Natoma Shores subdivision and the surrounding neighborhoods of the Historic District, as well as a representative from the Sacramento County Funeral Commission) voiced concems about and asked for denial of the proposed project, siting many of the same reasons expressed in the previously submitted letters. Following extensive public comment, the Historic District Commission engaged in a lengthy discussion regarding the proposed project on primary topics related to air quality, fte hazards, aesthetics, cultural resources, property values and required CUP findings.

With respect to air quality, the Historic District Commission discussed the preliminary Health Risk Assessment performed for the IS/MND and spoke with a representative from SMAQMD about the air district's permitting and enforcement process. It was reiterated that Best Available Control Technologies (BACTs) would be required for the cremation machine which would limit air pollution. Regarding complaints, the SMAQMD explained that they typically respond within 24 hours and visit both the complainant and the potential sources of the complaint.

Notices of violation and fines may be levied under the air district's authority to enforce public nuisance provisions and facilities with persistent violations or nuisances are subject to permit revocation. SMAQMD Staff also noted that persistent complaints that result in such actions may result in revocation of the CUP.

With regards to an increase in potential cancer rates due to the crematorium, HELIX staff began the discussion by noting that there is a risk of potentially developing cancer inherent in breathing the air around us. In the state of California, thal baseline risk is approximately 800 cases per I million people. When analyzing whether a proposed project has the potential to increase that baseline risk due to the project's impact on air quality, an increase in 10 cancer cases per million people would be considered significant. Based on modeling and its analysis, HELIX determined that this project has the potential to increase the baseline risk of potentially 5

Page 471 ends

05/10/2022 Item No.18.
developing cancer by 0.5 cases per million people. This analysis assumes that someone would remain at the maximum point of exposure consecutively for 30 years. HELIX staff also explained that this analysis does not mean that anyone will necessarily develop cancer; the focus is on the potential risk that it will happen. For CEQA pu{poses, a potential increase of

0.5 cases per million people is not considered significant' Ultimately, a majority of the Historic District Commissioners expressed confidence in the air quality analysis in the IS/MND and SMAQMD process.

With respect to fire hazards, one or more Historic District Commissioners asked about the potential ftehazards of the proposed propane tanks. Folsom Fire Chief Ken Cusano clarified that the commercial-grade tanks require an operation permit from the Fire Department and are designed to vent. Chief Cusano was also asked about public concern regarding the adequacy of existing evacuation routes in case of fire. Chief Cusano stated that since the crematorium posed no significant fire danger to the area as conditioned, there would be no significant impact to evacuation routes. Chief Cusano also stated that the Fire Department can open the opposite end of Forrest Street if needed and that potential issues with Light Rail gates being in the down position on the evacuation route during an emergency event can be worked out by contacting Light Rail during an emergency to stop trains from coming to the area. During deliberation, individual Historic District Commissioners expressed confidence with regards to staffs analysis of fire hazard impacts.

With respect to aesthetics, individual Historic District Commissioners asked for clarification on the ultimate height of the stack and what kind of control SMAQMD has over the height.

Commissioners also questioned whether design review would be warranted for the proposed stack or whether they could provide design parameters as part of the CUP so that a separate design review would not be necessary. HELIX commented that the analysis done for the IS/MND assumed a height of 19.5 feet from finished grade based on specifications provided to them by the applicant. The SMAQMD representative noted that the Air District does not advocate for a specific height unless the height proposed by the applicant does not meet the district's air quality standards for nearby sensitive receptors.

With respect to cultural resources, individual Historic District Commissioners expressed concern that the project was not consistent with Historic District Design and Development Guidelines (DDGs) Policy 2.2, which states that "the City shall encourage National Register nomination of historic buildings as well as other historical designations by state or local agencies" given the Sacramento County Cemetery Advisory Commission's letters. Individual Commissioners also expressed concern that the proposed crematorium is not an historic use.

ECORP staff, who prepared the Cultural Resources Inventory Report, stated that many different cultures' funerary practices have occurred at Lakeside Memorial Lawn and that introducing a new practice (cremation) would not be the first time that a new funerary practice has been introduced on the project site. They also stated that while uemation is not a typical 6 Page 472
05/10/2022 Item No.18.
part of Chinese funerary practices, buming of possessions was common in such practices, and occurred in the Chung Wah cemetery until the 1960's.

ECORP stated that whether a crematory is an appropriate use on the project site is not an archeological question but if a crematory were to be located on the project site, the proposed location would be the most appropriate place for it since it is in a modern, previously disturbed maintenance area of the cemetery. Historic District Commissioners agreed that the appropriateness of the use is for the HDC to decide, but several commissioners stated that their cultural resources concerns had not been adequately addressed, especially since the Sacramento County Cemetery Advisory Commission stated that the crematorium would have a negative impact on the historical significance of the cemetery. Individual Historic District Commissioners stated that they wished that the Cemetery Advisory Commission would have provided more information regarding how specifically the crematory would have a negative impact but stated that the Cemetery Advisory Commission would have time to provide a greater level of detail before a City Council meeting, as it was assumed that their decision would be appealed by either the public or the applicant based on the level of project controversy. Staff has since reached out to the Cemetery Advisory Commission directly after the hearing for more information. The Cemetery Advisory Commission communicated to staff that they were able to meet regarding the proposed crematory prior to publication of the City Council staff report and that the comments they made in2002 still stand.

With respect to property values, individual Historic District Commissioners asked whether property owners would be required to provide disclosures that they live near a crematorium.

The Assistant City Attorney stated that they did not see anything specifically in their research of real estate laws that would necess'arily require that the presence of a crematory would have to be disclosed but recommended that anyone with concerns about real estate disclosures should consult a realtor or a real estate attorney. However, multiple Historic District Commissioners stated that they believe that the presence of a crematory would be detrimental to nearby residential property values and that realtors would take that into account when determining home listing prices.

Finally, with respect to the required CUP findings, individual Historic District Commissioners asked for clarification as to why the findings in the 2003 staff report differed from those in the 2022 staff report. One commissioner referenced that the 2003 staff report showed that the originally proposed crematorium was not consistent with the DDGs and questioned how the newly proposed project is different. Multiple commissioners brought up the high volume of public comments received from members of the surrounding community and wondered if the finding that the project would not be detrimental to the peace, morals, comfort and general welfare of persons residing or working in the neighborhood or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the city could be met given the amount of opposition from the neighborhood and chances of property values going down due to the presence of a crematorium in the area. Staff clarified that the 2003 staff 7

Page 473 ends

05/10/2022 Item No.18.
report relied on an internally produced IS/MND with no technical studies performed by cultural resources experts, and without further information beyond the letter from the Cemetery Advisory Commission, denial was recommended. Staff recommended approval in the 2022 staff report in part because of the conclusions of the Ecorp Cultural Resources Inventory Report.

At the conclusion of the Historic District Commission meeting on February 16,2022, a motion was made to approve the proposed CUP and ISi\4ND with additional conditions added to install a weather station on the structure on which the crematory would be located to collect wind data for potential smoke and odor complaints and for the stack to be subject to design review by the Historic District Commission subsequent to obtaining a permit from the SMAQMD. That motion was seconded but failed by a vote of 1-6. A second motion was then made to deny the CUP using the same finding that was made in the 2003 staff report that stated that the use is detrimental to the health, safety, or general welfare of persons residing or working in the neighborhood, and detrimental or injurious to property and improvements in the neighborhood and the general welfare of the city because introduction of this use will impact the historical character of the existing cemetery and historical use of the area. This motion was seconded and passed with a vote of 6-1.

Since the Historic District Commission hearing, and in response to the timely appeal, staff received additional comments from the public and the Cemetery Advisory Commission for consideration during the appeal. All such comments oppose the project and recommend denial of the appeal. These letters are included in Attachment 6 of this staff report.

The City Council considered the appeal at the April26,2022 meeting. At that meeting, staff presented the project and appeal, the applicant presented his appeal, and the City Council opened the public hearing and heard public testimony from members of the public who were physically present at the meeting. The public hearing was then continued to this meeting in response to technical challenges to ensure that any interested persons intending to participate remotely would have an opportunity to provide comments prior to any action/decision by the City Council. Public comment letters that were received after publication of the April26,2022 staff report are included in AttachmentT and public comment letters received since the April 26,2022 hearing are included in Attachment 8.

POLICY / RULE
As set forth in Section 17 .52.7 00 ofthe Folsom Municipal Code, actions ofthe Historic District Commission may be appealed to the City Council. The appeal shall be in writing, shall state the specific reason for the appeal and grounds asserted for relief, and shall be filed no later than 10 calendar days after the date of the action being appealed. 8

Page 474 ends

05/10/2022 Item No.18.

APPEAL/ANALYSIS
On February 22, 2022, project applicant Igor Semenyuk submitted a timely appeal of the decision of the Historic District Commission denying the proposed project (Attachment l).

The applicantlappellant later submitted a supplemental letter providing additional reasoning for the appeal, also included in Attachment 1.

In his appeal and supplemental letter, Mr. Semenyuk makes the following claims

1. The findings for denial were that the project was detrimental to health and safety/general welfare of the neighborhood, and to property values in the neighborhood and city and that there would be impacts to the historical character of the cemetery and area. However, no data was provided by the Commission to support their findings for denial. Their denial was based on the residents' concerns rather than the data from the staff report and IS/MND.

2. Staff recommended approval of the crematorium and an IS/MND was prepared by multiple parties, including experts who were present at the hearing to defend their findings. The IS/MND showed that the project was well below CEQA thresholds of significance.

3. The crematorium would not impact the historical character of the cemetery since it is being placed inside a modern metal shed within a modern area of the cemetery.

4. There are existing regional cemeteries included on historical resources lists in which modern crematoriums currently operate.

5. The crematorium would not significantly impact property values of the neighborhood as property values are dictated by current market values in real estate.

6. There are no industrially zoned areas in Folsom that have a neighborhood more than 500 feet from the property, so alternative industrially-zoned locations would not result in fewer impacts to residences.

Citv Staff Resnonse
Reasoning Behind Commission Findings for Denial
In the finding for denial, the Historic District Commission stated that the introduction of the crematory use will impact the historical character of the existing cemetery and historical use of the area and would therefore be detrimental or injurious to property and improvements in the neighborhood and the general welfare of the city. In their deliberations, the Commission cited the letters received from the Cemetery Advisory Commission which stated that the crematorium would be inappropriate near the surrounding cultural resources of historic 9

Page 475 ends

05/10/2022 Item No.18.
importance and could threaten the nomination of the Young Wo Cemetery and adversely affect the historic features and burials of those buried nearby. While the Historic District Commission discussed factors related to air quality, property values, and fire hazards,the finding they made was related specifically to the historical character of the cemetery and area, including the historical nature of the Young Wo Cemetery and the people who are buried there.

Staff s Recommendation for HDC Approval
As explained in the February 2022HDC staff report, the analysis in the IS/MND did result in a staff recommendation for HDC approval of the project. To approve the project, the Historic District Commission had to find that the project WOULD NOT be detrimental to the health, safety, peace, morals, comfort and general welfare of persons residing or working in the neighborhood or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the city. However, after considering the staff report, IS/MND, public comments and comments from the Cemetery Advisory Commission, the Historic District Commission determined that the project WOULD (as noted in the analysis above), be detrimental or injurious to property and improvements in the neighborhood and the general welfare of the city due to the introduction of the crematory use impacting the historical character of the existing cemetery and historical use of the area.

Impacts to the Historical Character of the Cemetery
During the Historic District Commission's questions to staff and consultants, Lisa Westwood with Ecorp Consulting stated thatif acrematorium were to be placed on the cemetery grounds, the existing metal building within the modern maintenance areawould be the best location for a crematorium on the project site. Furtheffnore, the Cultural and Tribal Resources section of the IS/MND found that there would be a less than significant impact with standard mitigation related to the unanticipated discovery of archeological or paleontological resources during construction based on the analysis provided in Ecorp's Cultural Resources Inventory Report.

However, the letters sent by the Cemetery Advisory Commission stated that the crematorium would be inappropriate near the surrounding cultural resources of historic importance and could threaten the nomination of the Young Wo Cemetery and adversely affect the historic features and burials of those buried nearby. Ultimately, the Historic District Commission voted to deny the Conditional Use Permit because the Commission found that introduction of a crematorium would impact the historical character of the existing cemetery and historical use ofthe area.

Other Historic Cemeteries with Crematoriums
Staff coordinated with SMAQMD to identiff all crematoriums operating in Sacramento County. While there are five cemeteries in Sacramento County with operational crematoriums, staff did not identi$ any of these cemeteries as being on a cultural or historical resources list. l0

Page 476 ends

05/10/2022 Item No.18.

Impacts to Property Values
Several members of the Preserve/Lake Natoma Shores community expressed concern that the crematorium would negatively impact the property values of their homes. While the Historic District Commission discussed potential impacts to property values, the finding for denial was based the introduction of the crematory use negatively impacting the historical character of the existing cemetery and historical use of the area.

Industrial Properties Adjacent to Residential Uses
Staff researched industrial properties located within the city in relation to their proximity to residential uses. Staff found that, of the properties within the city zoned M-l and M-2, four areas (Lake Forest Technical Center, Kikkoman property, 250 Outcropping Way, and 600 Coolidge Drive) have either buildings or vacant property located over 600 feet from residential uses, though none of the properties currently on the real estate market consist of a building in scale with the small shed in which the applicant is proposing to operate the crematorium.

FINDING FOR DENIAL
Based on the foregoing, staff recommends that the appeal be denied based on the following finding:

CONDITIONAL USE PERMIT FINDING
A. THE USE APPLIED FOR IS DETRIMENTAL TO THE HEALTH, SAFETY, PEACE,

COMFORT, MORALS, OR GENERAL WELFARE OF PERSONS RESIDING OR

WORKING IN THE NEIGHBORHOOD, AND DETRIMENTAL OR INJURIOUS TO

PROPERTY AND IMPROVEMENTS IN THE NEIGHBORHOOD AND THE

GENERAL WELFARE OF THE CITY BECAUSE INTRODUCTION OF THIS USE WILL IMPACT THE HISTOzuCAL CHARACTER OF THE EXISTING CEMETERY AND HISTORICAL USE OF THE AREA.

CONCLUSION
Based on the information contained in this report and the Historic District Commission's denial of the Conditional Use Permit for the Lakeside Memorial Lawn Crematorium project (PN 19- 182) located at l20l Forrest Street, staff recommends denial of the appeal by Igor Semenyuk to overturn the Historic District Commission decision.

ATTACHMENTS

1. Letter of Appeal from Igor Semenyuk, dated February 22,2022, and Supplemental Appeal Reasoning, received March I1,2022

2. Historic District Commission Staff Report, dated February 16,2022 11Page 477
05/10/2022 Item No.18.

3. Public Comment Letters received after the February 16,2022 Historic District Commission Meeting

4. HELIX Topical Responses to IS/MND Comments

5. Draft Minutes from February 16,2022 Historic District Commission Meeting

6. Public Comment Letters Regarding the Applicant's Appeal

7. Public Comment Letters Received After Publication of the April 26,2022 Staff Report

8. Public Comment Letters Received After the April 26,2022 Hearing Submitted,

PAM JOHNS
Community Development Director
t2Page 478
05/10/2022 Item No.18.

Attachment 1
Letter of Appeal from Igor Semenyuk, dated
February 22,2022, Td Supplemental Appeal Reasoning,
received March 11 ,2022

Page 479 ends

05/10/2022 Item No.18.

CITY OF FOLSOM

APPEAL FORM
grl h/t< tc
Ao+ $co1l Sr
Fi:t15ff'1 r.ll'i'/ r-:L iEl'i'l ilif i
33 FEg'?? *i111:L0
NAME OF APPELLANT:

MAILING ADDRESS;
lnterest in Matter:

Daytime Phone:

Action Being Appealed
FO\s.'s^^ c.A qSvT 0
it.- r)v t w
9 tr, - qI d- bSog
t'Aofio^ ,u\'u> t412.[ tse d
Date of Decision or Date Project was Heard: z tk
Reason forAppeal:
c+r^ql onJ . €\a:.l^- 2 tl nok
(- .-.{r(t^
t 2
)F "\-
tu,rc J aAao
ltQg.tv
't 2
-tSignature Date
STAFF USE ONLY:
2 Fee Paid:
oqrt
Date Received:

Planning Gomm. or Historic District Comm.

Declsion Appeal
Type of ProjecUfee:

Owner le Family Dwelling $238
Tentative Hearing Date:

Copies to: Community Development Director
City Manager
City Attorney
City Clerk
Admin. (staff decision) Appeal
Type of ProjecUfee:

Owner Occupied $233
Other $468
Time Limit Waived:
,r/ T7
--
All
Received by:

Appeal fees set by City Council Resolution No. 10297 approved June 11, 2019.

Updated February 2Q22
i
$479

Page 480 ends

05/10/2022 Item No.18.

To: Folsom City Council
Reason for Appeal of Historic District Commissioners Meeting held 21L612022 ln the interest of the project called Lakeside Memorial Lawn Crematorium the motion of the commissioners was denial, all but one- CommissionerJustin Raithel.

The Findings claimed for denialwas as follows:
- Detrimental to health and safety/ general welfare of neighborhood' - Detrimentalto property value in neighborhood and city. - lmpacts historical character of cemetery and area"
, The recommendatlon of the planning committee was approval of the crematorium' A full scope Environmental Report was done with multiple experts. Experts were present in the meeting to defend their findings. The findings and dala showed that the project was well below any thresholds of CA standards for health and safety. The crematorium would not impact any historical character of the cemetery as the project was being placed inside the modern metal shed in the modern area of the cemetery. lt does not significantly impact the property values of the neighborhood. That is dictated by current market values in real estate.
ln the meetin& a presentation was shown with funeral homes and cemeterles that are listed as historical cemeteries having and operating modern crematoriums in their facilities. All of the crematoriums shown are ctoser to residents, business and restaurants thdn the proposed crematorium at Lakeside Cemetery.

The data was not considered at all. Everything was drowned out by residents who just don't want it near their neighborhood. They want cremation services; they just want it done in other cities. There is no area in Folsom that is zoned industrlalthat does not have a neighborhood within 500 feet of it. Folsom is growing. Cremation demand is growing. A crematory is essential to the growing demand. lf you can't place a crematory in a cemetery, then where can you?
The denial was based on findings, yet when asked what those were, none could be provided. No data was provided to prove that it is detrimentalto the health and safety, that it is detrimentalto the property values and that it impacts any historical character. No matter what the experts data was, it was Just dismissed with prcjudice.

We implore you to reconsider the historic commission decision on the crematory. A city is larger than just one neighborhood.

Thank you,
lgor Semenyuk

Page 481 ends

05/10/2022 Item No.18.

Attachment 2
Historic District Commission Staff Report
Dated February 16,2022

Page 482 ends

05/10/2022 Item No.18.

AGENDA ITEM NO. 1
Type: Public Hearing
Date: February ',6,2022
]FOE S(}$6
Project:

File #:

Request:

Location:

Parcel(s):

Staff Contact:

Property Owner
Name: Lakeside Memorial Lawn
Address: 1201 Forrest Street
Folsom CA 95630
Historic District Commission Staff Report
50 Natoma Street, Council Chambers
Folsom, CA 95630
Lakeside Memorial Lawn Crematorium Conditional Use Permit PN-19-182
Conditional Use Permit
1201 Forrest Street
070-0260-001 -0000
Josh Kinkade, Associate Planner, 916-461-6209
jkinkade@folsom. ca. us
Applicant
Name: lgor Semenyuk
Address: 507 Scott Street
Folsom, CA 95630
Recommendation: Conduct a public hearing and upon conclusion recommend approval of a Conditional Use Permit to allow for a crematory to operate in an existing metal structure situated within the Lakeside Memorial Lawn cemetery located at 12O1 Forrest Street (PN 19-182) subject to the findings included in this report (Findings A-K) and attached conditions of approval (Conditions 1-30).

Project Summary: The proposed project includes operation of a crematorium in an existing 1,O71-square foot metal structure within the Lakeside Memorial Lawn cemetery located at 1201 Forrest Street.

Table of Gontents:

1. Description/Analysis

2. Background

3. Proposed Conditions of Approval

4. Vicinity Map

5. Overall Site Plan, Detailed Site Plan and Floor Plan Dated 2-19-20

6. Hartwick Combustion Technologies Floor Plan, Outer Dimensions and Specs

7. Updated Site Plan with Current Layout of Maintenance Area

8. Applicant's Rendering of Proposed Crematorium Stack

9. Applicant's Narrative

10. Photographs of the Project Site

11. Draft lnitial Study/Mitigated Negative Declaration, Dated January 2022 City of Folsom Page 1

Page 483 ends

05/10/2022 Item No.18.

I
lli
'.r'
Y
AGENDA ITEM NO. 1
Type: Public Hearing
Date: February 16,2022
F'OLg(}lld rrlf t O t
Orr:ltrCftY! lt i*trnl

12. lmages of Crematoriums Adjacent to Residential Uses in the Region

13. Public Comments Received Prior to Staff Report Publication Submitted,

PAM JOHNS
Community Development Director

Page 484 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 1

DESCRIPTION/ANALYSIS

APPLICANT'S PROPOSAL
The applicant, lgor Semenyuk, is requesting approval of a Conditional Use Permit (PN 19-182) to operate a crematorium in an existing 1,071-square foot metal structure within the Lakeside Memorial Lawn cemetery located at 1201 Forrest Street. The proposed project includes the installation of one HCT Apex-250 crematory (manufactured by Hartwick Combustion) within an existing metal structure. The roof of the structure would be cut open to accommodate this device, but the structure's footprint would not be expanded. In addition, a 10-foot-wide by 1S-foot-wide walk-in coolerwould be installed inside the structure to provide temporary, short-term storage of human remains prior to cremation. Two 2S0-gallon propane tanks will be installed on a proposed concrete pad along the northern side of the structure to provide power for the crematorium, as no gas lines currently exist on the property. The concrete pad will cover approximately 38.3 square feet of ground. An exhaust stack will be installed on the roof of the metal structure (as shown in Attachment 6). The applicant proposes up to four cremations per day and expects that the totalwill not exceed 500 cremations per year. Ayerage cremation time is approximately 90 minutes. One to two employees would be present to operate the crematorium during the cremation process. Existing parking spaces would be utilized to accommodate employees and visitors. The Applicant's project description, which includes additional information related to the cremation process and other project-related details, is included as Attachment 9, Please refer to Attachment 5 for the proposed site plans and floor plan and Attachment 6 for the Hartwick Combustion Technologies Floor Plan, Outer Dimensions and Specifications.

POLICY/RULE
Section 17.52.550 of the Folsom Municipal Code (FMC) states that cemeteries are permitted in the Open Space/Public Primary Area of the Historic District with a conditional use permit ('CUP"). The Folsom Municipal Code does not address crematoriums as a land use.

Section 17.52.360 of the FMC states that the Historic District Commission (HDC) shall have final authority relating to the issuance of Conditional Use Permits for any of the uses or purposes for which such permits are required or permitted by the terms of this title, within the boundaries of the Historic District.

Use Permits are governed by Chapter 17.60 of the FMC. Section 17.60.040 states that the findings of the Commission shall be that the establishment, maintenance or operation of the use applied for will or will not, under the circumstances of the particular case, be detrimental to the health, safety, peace, morals, comfort and general welfare of persons residing or working in the neighborhood of such proposed use or be detrimental or injurious to property and improvements in the neighborhood, or to the general welfare of City of Folsom Page 3

Page 485 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
the city

ANALYSIS
General Plan and Zoninq Consistencv
The General Plan land use designation for the project site is OS (Open Space) and the zoning designation for the project site is OS/P (Open Space/Public Primary Area of the Historic District) with an underlying zoning of OSC (Open Space Conservation District).

The zoning designation is consistent with the General Plan designation.

Cemeteries are a permitted use within the OS/P Primary Area upon approval of a Conditional Use Permit (CUP) per Section 17.52.550 of the FMC. The subject cemetery has been in operation since the 1800's and pre-dates the requirement for a CUP. The cemetery did receive a CUP for operation of a mausoleum in 1995. The proposed crematory would be operating as an accessory use to the existing cemetery, not as a stand-alone business.

Crematories are not specifically addressed in the Folsom Municipal Code. The Commission would then determine whether to approve the request for a CUP and impose appropriate conditions. lf not, then the proposed crematory would not be considered a permitted use, even with a CUP.

A primary or principal use is the main use to which premises are devoted and the primary purpose for which the premises exist. Primary uses may be permitted by right or may be conditional uses subject to a CUP. Accessory uses are structures or activities that are subordinate in area, extent, and purpose to the primary use; contribute to the comfort, convenience, or necessity of the principal use; and are located on the same lot and the same zoning district as the principal use. Home occupations are a typical example of an accessory use. By definition, an accessory use must be associated with a principal use and cannot be established on a property without a principal use. (Adam U. Lindgren & Steven T. Mattas, California Land Use Practice (2021) S 4.46, Primary and Accessory Uses.)
ln this case, the cemetery is the primary or principal use. The applicant proposes a crematorium aS an accessory use to the existing cemetery. As proposed, the crematorium would be subordinate in area, extent, and purpose to that of the existing cemetery. lt would provide a service related to and supportive of the service already provided by the cemetery and mausoleum. lt would be located on the same lot and in the same zoning district as the principal use. lt would be owned and operated by the same people who own and operate the existing cemetery and mausoleum.

As a part of the work to analyze whether a crematory is appropriate as an accessory use City of Folsom Page 4

Page 486 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
to an existing cemetery, staff researched data available from the Sacramento Air Quality Management District regarding the locations of existing crematoriums within the county.

As described in more detail in the Land Use Compatibility/Site Considerations section of the report, staff found that 16 crematoriums are currently operating within Sacramento County, five of which are located within cemeteries (East Lawn Memorial Park, Sacramento Memorial Lawn, St. Mary Cemetery and Funeral Center, and Sunset Lawn Chapel of the Chimes in Sacramento, and Mount Vernon Memorial Park & Mortuary in Fair Oaks).

Public comment letters have stated that a crematory is not appropriate as an accessory use in this case for a variety of reasons. Upon review, staff reads the majority of those comments to raise concerns about the impacts of the proposed use. Many, if not most, of the impacts discussed in the public comment letters can be mitigated by imposing appropriate conditions on the project. For that reason, as well as the fact that the crematory is not proposed as a stand-alone business but as an accessory use to the existing cemetery, staff analyzed those comments through the lens of the CUP.

Based on the analysis described above, staff concluded that the crematorium, as proposed, is an appropriate accessory use to the existing cemetery.

Gonditional Use Permit
ln order to approve a request for a Conditional Use Permit, the Commission must find that the "establishment, maintenance, or operation of the use or building applied for will or will not, under the circumstances of the particular case, be detrimental to the health, safety, peace, morals, comfort, and general welfare of persons residing or working in the neighborhood of such proposed use, or be detrimental or injurious to property and improvements in the neighborhood, or to the general welfare of the City" (FMC section

17.60.040).

In evaluating the Conditional Use Permit, staff considered the proposed use and its compatibility with existing land uses in the area, as well as air quality impacts, cultural resources impacts, fire/life safety impacts, traffic/access/circulation/parking impacts, noise impacts, and visual impacts. Each of these subject matters are discussed in detail below and are further discussed in the Lakeside Memorial Lawn Crematorium lnitial Study/Mitigated Negative Declaration (lSiMND) provided in Attachment 11.

Should the Commission grant the proposed Lakeside Memorial Lawn Crematorium Conditional Use Permit, the CUP would be subject to ongoing review by the Community Development Department to ensure that it does not result in any adverse impacts to the community. Pursuant to FMC Section 17.60.050 ,
in any case where the conditions to the
granting of a use permit have not been, or are not, complied with, the Historic District Commission may revoke the permit after a public hearing on the matter. ln addition, if the Community Development Director finds evidence that conditions of approval for the City of Folsom Page 5

Page 487 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Lakeside Memorial Lawn Crematory business have not been fulfilled or that the use has resulted in a substantial adverse effect on the health, and/or general welfare of users of adjacent or proximate property, or have a substantial adverse impact on public facilities or services or the general welfare of the City, the Director will refer the use permit to the Historic District Commission for review. lf, upon such review, the Historic District Commission finds that any of the above-stated results have occurred, the Commission may modify or revoke the Conditional Use Permit following a hearing on the matter.

Condition No. 4 is included to reflect this requirement.

Air Quality
As part of the CEQA documentation for the proposed project, an Air Quality and Greenhouse Gas Assessment was prepared by HELIX Environmental Planning, lnc., and is included in Attachment 11. Two daily cremations were analyzed under the original environmental document, an lnitial Study/Mitigated Negative Declaration (lS/MND) and the applicant later asked that the analysis show impacts for four cremations per day. As a result, HELIX also prepared an Addendum to the Folsom Lakeside Crematorium Project Air Quality and Greenhouse Gas Emissions Assessment, included in Appendix B of the lS/MND, that provides additional analysis regarding the air quality and greenhouse gas emissions assessment based on additional daily cremations. This analysis was incorporated into the lS/MND as well.

As a part of its environmental review, HELIX analyzed whether the proposed project will have or will potentially have a significant adverse impact on the environment, either individually or cumulatively with other projects. With respect to air quality, HELIX used the standard Environmental lnitial Study Checklist to consider four main questions:
a. Would the project conflict with or obstruct implementation of the applicable air quality plan?
b. Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? c. Would the project expose sensitive receptors to substantial pollutant concentrations?
d. Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Ultimately, Helix determined that the proposed project would have no impact with respect to question b and would have a less than significant impact with respect to questions a, c, and d. The following sections provide an overview of the analysis related to sensitive receptors, criteria pollutants, toxic air contaminants and odors as they relate to both construction and operation of the proposed project.

City of Folsom Page 6

Page 488 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Sensitive Rece
ln general, some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved and are referred to as sensitive receptors. Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers.

The California Air Resources Board (CARB) and the Office of Environmental Health Hazard Assessment (OEHHA) have identified the following groups of individuals as the most likely to be affected by air pollution: people over 65 years old, children under 14 years old, infants (including in utero in the third trimester of pregnancy), and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis.

Residential areas are considered sensitive receptors to air pollution because residents (including children and people over 65) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Children and infants are considered more susceptible to health effects of air pollution due to their immature immune systems, developing organs, and higher breathing rates. As such, schools are also considered sensitive receptors, as children are present for extended durations and engage in regular outdoor activities,
The closest existing sensitive receptors to the project site are multiple single-family residences adjacent to the cemetery to the north, between 450 and 750 feet from the proposed crematory location, and mobile homes across Folsom Boulevard to the east, approximately 700 feet from the proposed crematory location. The closest schools to the project site are the Folsom Montessori School approximately 3,200 feet (0.6 miles) to the northeast and the Golden Valley Charter River School. That school is located across Lake Natoma from the project site and, though it is approximately 2.7 miles away by car, its physical location is about 3,000 feet (ust over one-half mile) northwest of the project site.

The nearest daycare is located 1,800 feet (0.3 miles) from the project site and the nearest hospital is located over 9,000 feet (1.8 miles) from the project site Criteria Pollutants
Ambient air quality is described in terms of compliance with state and national standards, and the levels of air pollutant concentrations considered safe, to protect the public health and welfare. These standards are designed to protect people most sensitive to respiratory distress, such as asthmatics, the eldedy, very young children, people already weakened by other disease or illness, and persons engaged in strenuous work or exercise. The U.S.

Environmental Protection Agency (USEPA), the federal agency that administrates the Federal Clean Air Act of 1970, as amended in 1990, has established national ambient air quality standards (NAAOS) for several air pollution constituents known as criteria pollutants, including: ozone (Oe); carbon monoxide (CO); coarse particulate matter (PMro; particles 10 microns or less) and fine particulate matter (PMz.s; particles 2.5 microns or less); sulfur dioxide (SOz); and lead (Pb).

City of Folsom Page 7

Page 489 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
As permitted by the Clean Air Act, California has adopted the more stringent California ambient air quality standards (CAAOS) and expanded the number of regulated air constituents. Ground-level ozone is not emitted directly into the environment but is generated from complex chemical and photochemical reactions between precursor pollutants, primarily reactive organic gases (ROGs; also known as volatile organic compounds [VOC]), and oxides of nitrogen (NOx). PMro and PMz.s are generated from a variety of sources, including road dust, diesel exhaust, fuel combustion, tire and brake wear, construction operations and windblown dust. ln addition, PMro and PMz.s can also be formed through chemical and photochemical reactions of precursor pollutants in the atmosphere.

CARB is required to designate areas of the state as attainment, nonattainment, or unclassified for the ambient air quality standards. An "attainment" designation for an area signifies that pollutant concentrations do not violate the standard for that pollutant in that area. A "nonattainment" designation indicates that a pollutant concentration violated the standard at least once. An "unclassified" designation indicates that insutficient data was available to determine the status. Sacramento County is designated as being in nonattainment for the state and federal ozone standards, the state PMro standards, and the federal PMz.s standards.

The Sacramento Metropolitan Air Quality Management District (SMAQMD) is responsible for implementing emissions standards and other requirements of federal and state laws in Sacramento County. Attainment plans for meeting the federal air quality standards are incorporated into the State lmplementation Plan (SlP), which is subsequently submitted to the USEPA.

The current air quality plan applicable to the project, the Sacramento Regional 2008 NAAQS 8-Hour Ozone Attainment and Reasonable Further Progress P/an (Regional Ozone Plan), was developed by the SMAQMD and adjacent air districts to describe how the air districts in and near the Sacramento metropolitan area will continue the progress toward attaining state and national ozone air quality standards With respect to criteria pollutants, HELIX looked at whether the proposed project would conflict with or obstruct implementation of the Regional Ozone Plan or the SlP, either during construction or operation of the proposed project. HELIX also analyzed whether the proposed project would result in a cumulatively considerable net increase of any criteria pollutant for which the region is in non-attainment under applicable California Ambient Air Quality Standards. Highlights from that analysis are included in the following paragraphs. The full analysis is contained in Attachment 11. Furthermore, Condition No. 16, requires compliance with the Regional Ozone Plan.

Construction (Short-Term) Em issions
Construction of the project would involve the use of a crane for several hours to unload the chiller and crematory from the truck, and the use of a mini excavator or skid steer loader for one day and one truck load of concrete to install a small pad for the two propane City of Folsom Page 8

Page 490 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
tanks.

Typically, projects that are 35 acres or less in size will not exceed the SMAQMD's construction NOx or PM thresholds of significance. Even so, all construction projects are required to implement the SMAQMD's Basic Construction Emission Control Practices (also known as Best Management Practices [BMPs]). The BMPs satisfy the requirements of SMAQMD's Rule 4O3, Fugitive Dust, which requires every reasonable precaution not to cause or allow the emissions of fugitive dust from being airborne beyond the property line from which the emission originates.

Reactive Organic Gas (ROG) emissions during construction are generally associated with the application of architectural coatings. The project does not propose any new structures, would not require substantial amounts of painting, and would not result in significant emissions of ROGs.
lf approved, the proposed project will be required to implement SMAQMD's BMPs and it will not result in significant emissions of ROGs. Therefore, construction of the project would not result in a cumulatively considerable net increase of any criteria pollutant and the proposed project's impact on implementation of the Regional Ozone Plan would be less than significant with implementation of Condition No. 16, which requires implementation of the SMAQMD's BMPs.

Operation (Lono-Term) Emissions
The project would result in long-term operational emissions from two sources: (1) vehicles that drive to and from the project and (2) from operation of the crematory.

With respect to emissions from vehicles, because there are no crematories currently operating in Folsom, demand for cremation services is filled by transporting the deceased to facilities outside of the City. Therefore, operations of the projectwould not result in new vehicle trips (nor the associated emissions in the region). lnstead, the project would replace existing regional vehicle trips with shorter trips (and reduced associated emissions).

Operation of a propane-fired crematory would be considered a new stationary source of emissions. The project is subject to SMAQMD's Rule 2O1, General Permit Requirements, and Rule 2O2, New Source Review. Pursuant to these Rules, the project would be required to implement best available control technology (BACT) for the minimization of emissions.

BACT for crematories is incorporated into the product design in the form of controls which ensure maintenance of the correct temperatures and cycle times, and a secondary combustion chamber which ensures oxygenation and complete combustions of all fuels.

As shown in Table 4 of the IS/MND included in Attachment 11 and Table 1 of the Air Quality Addendum memo included in Appendix B of the lS/MND, the project's operational City of Folsom Page 9

Page 491 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 1 9-182) February 16,2022
emissions of criteria pollutants and precursors would not exceed the SMAQMD daily or annual thresholds. Therefore, the project's operational emissions would not result in a cumulatively considerable net increase of any criteria pollutant and impacts from operation of the crematory on implementation of the Regional Ozone Plan would be less than significant.

Toxic Air Contaminants
Toxic air contaminants (TACs) are a diverse group of air pollutants that may cause or contribute to an increase in deaths or in serious illness or that may pose a present or potential hazard to human health. TACs can cause longterm chronic health effects such as cancer, birth defects, neurological damage, asthma, bronchitis, or genetic damage, or shortterm acute etfects such as eye watering, respiratory irritation (a cough), runny nose, throat pain, and headaches. TACs are considered either carcinogenic or noncarcinogenic based on the nature of the health effects associated with exposure to the pollutant. For carcinogenic TACs, there is no level of exposure that is cortsidered safe and impacts are evaluated in terms of overall relative risk expressed as excess cancer cases per one million exposed individuals. Noncarcinogenic TACs differ in that there is generally assumed to be a safe levelof exposure belowwhich no negative health impact is believed to occur. These levels are determined on a pollutant-by-pollutant basis.

Crematories are a potential source of TACs as a result of trace metals and organic compounds that accumulate in the body throughout a person's life and are released during combustion of human remains, and as a result of trace organic compounds that are formed in the combustion process. These TACs include: metals and inorganics (i.e., arsenic, beryllium, cadmium, chromium, copper, hydrogen fluoride, lead, mercury, nickel, selenium, zinc); VOCs (i.e., benzene, toluene, xylenes, vinyl chloride); aldehydes (i.e., acetaldehyde, formaldehyde); polyaromatic hydrocarbons (PAHs); polychlorinated dibenzodioxins (dioxins; PCDD); and polychlorinated dibenzofurans (furans; PCD).

Prolonged exposure to significant concentrations of these TACS can result in a variety of adverse health effects including cancers, chronic conditions, and/or acute conditions, depending on the substance and level of exposure. Based on the results of the Health Risk Assessment (HRA) included in Attachment 11, hexavalent chromium and mercury are the primary drivers of the health risks from crematory emissions because the health risks from crematory emissions of these substances are one or more orders of magnitude greater than the health risks from other TACs in crematory emissions.

Health risks associated with cancer from development projects are estimated using the incremental excess cancer risk expressed as cancer cases per one million exposed individuals. The incremental excess cancer risk is an estimate of the chance a person exposed to specific sources of a TACs may have of developing cancer from that exposure beyond the individual's risk of developing cancer from existing background levels of pollutants in the ambient air. For context, the average cancer risk from TACs in the ambient air for an individual living in an urban area of California is 830 in 1 million. Cancer risk estimates do not mean, and should not be interpreted to mean, that a person will develop cancer from estimated exposures to toxic air pollutants.

City of Folsom Page 10

Page 492 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
The maximum estimated community incrementalexcess cancer, chronic and acute health risks due to exposure to the project TAC emissions from long term operation of the proposed crematory are presented in Table 5 of the attached IS/MND. These estimates are conservative (health protective) and assume that the resident or worker is outdoors for the entire exposure period. This table shows that the maximum incremental increased cancer risks and maximum non-cancer chronic and acute hazard index due to exposure to TACs from long-term operation of the proposed crematory would not exceed the SMAQMD thresholds. Therefore, operation of the project would not result in the exposure of sensitive receptors to substantial TAC concentrations and the impact would be less than significant.

The Addendum to the lS/MND clarifies that regardless of whether the applicant performs two or four cremations daily, the Health Risk Assessment remains accurate, as it was based on the maximum hourly emissions rate and the average annual emissions generated by project operations, not the number of cremations performed daily. The hourly cremation rate would not change because there is only one cremation machine proposed as a part of this project. The annual emissions generated by the project also would not change with an increase from two to four cremations per day because the applicant has not requested modification to their request for up to 500 cremations per year. To ensure that the numbers in the HRA remain accurate, staff has added Condition No. 13 stating that no more than four cremations may be performed each and that no more than 500 cremations may be performed each year.
ln addition, the proposed crematory is considered a combustion source requiring an authority to construct permit to operate (A/C, PTO) from SMAQMD before it can be installed and operated. Staff has provided Condition No. 16, which statesthata building permit will not be issued until an A/C, PTO has been obtained from SMAQMD. SMAQMD has stated that the applicant will be required to provide analysis to ensure the crematory will meet all air district rules/regulations and significance thresholds during the air district's A/C, PTO application and review process. ln the event the air district's refined health risk assessment analysis shows that cancer risk or hazard index numbers exceed the significance thresholds noted, further restrictions to the crematorium would be required by SMAQMD before they would issue the A/C, PTO. As noted above, Condition No. 16 requires the proposed project to obtain and A,/C, PTO from the air district before the City will issue a building permit, so neither construction nor operation of the proposed project can occur without the A/C, PTO.

Odors
The IS/MND prepared for the proposed project found that diesel equipment could generate diesel exhaust odors during construction activities. The generation of odors during the construction period would be temporary, intermittent, and dispersed within a short distance from the active work area. Once operational, potential odors from human remains prior to cremation would be minimized either by immediately processing remains City of Folsom Page 1 1

Page 493 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
or by temporarily storing remains in the proposed refrigeration chiller. Operation of the crematory would not be a significant source odors or other emissions due to the BACT features of the crematory, including process temperature and cycle time controls, as well as secondary combustion chambers which ensure the complete combustion of all solids, liquids, and gaseous fuels. Therefore, the project would not result in other emissions (such as those leading to odors).

Cultural, Archaeological, Paleontological and Historical/Tribal Resources Lakeside Memorial Lawn cemetery is Folsom's only active historic cemetery, lt represents a combination of several old Folsom cemeteries, including the Masonic, Odd Fellows, Jewish, Citizen's, and Cook's cemeteries,
The existing metal structure was built in the 1990s and is located in a previously disturbed maintenance area. The project area itself is surrounded on the west and south by dredge mining tailings and the parcel is situated along a perennial watetway. All mining operations in the immediate vicinity of the project site had ceased by 1962. Based on a Cultural Resources lnvestigation performed by PAR Environmental for the mausoleum project for Lakeside Memorial Lawn in 1995, these tailings were determined not eligible for inclusion in the National Register of Historic Places by the Office of Historic Preservation. The report also states that the tailings do not meet California Environmental Quality Act guidelines as an important resource and do not qualify for inclusion in the California Register of Historic Places.

ECORP Consulting prepared a Cultural Resources lnventory Report of the proposed project that included a record search, Native American tribal consultation and a pedestrian survey. The results of the ECORP record search for cultural resources and Native American Heritage Commission Sacred Lands File Coordination search failed to reveal the presence of Native American cultural resources in the project area.

ECORP's pedestrian survey revealed no precontact or historic resources. The project site itself is not in an area otherwise suspected to contain unknown archaeological resources.

The site survey and surveys of written records, historical maps and photographs, and outreach to groups with knowledge of the area's history all suggest that no known or previously unknown archaeological resources would be encountered or disturbed during construction. Ground disturbing activity would be limited to shallow ground clearing and site prep for the installation of a concrete pad to support two propane tanks. Still, the potential exists for inadvertent discovery of archaeological resources during project construction. The implementation of standard archaeological rgsource construction conditions (Condition 18-21) would ensure that potential impacts would be less than significant.

Though the project site is located on the property of the Lakeside Memorial Lawn Cemetery, no human remains are known to exist in the immediate vicinity of the project site. No evidence of potential human remains outside of marked graves was found in the project area during the cultural resources site survey by ECORP's archaeologist. Ground City of Folsom Page 12

Page 494 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
disturbing activity would be limited to shallow ground clearing and site prep for the installation of a concrete pad to support two propane tanks. However, there is always the possibility that subsurface construction activities associated with the proposed project, specifically the preparation of the site for the small concrete pad, could potentially damage or destroy previously undiscovered human remains. However, if human remains were discovered, implementation of Condition No. 20 would reduce this potential impact to a less than significant level.

The ethnographic information reviewed for the project, including ethnographic maps, does not identify any villages, occupational areas, or resource procurement locations in or around the current project area. ln addition, the Sacred Lands File failed to identify any sacred lands or tribal resources in or near the project area. The cultural resources survey did not reveal any Native American archaeological sites within or adjacent to the proposed project area. As stated in the attached IS/MND document, the City performed AB-52 consultation with three local Native American tribes that have previously submitted general request letters. Wilton Rancheria, the lone Board of Miwok lndians and the United Auburn lndian Community. The purpose of consultation is to identify Tribal Cultural Resources (TCR) that may be significantly impacted by the proposed project and to allow the City to avoid or mitigate significant impacts prior to project approval and implementation. No specific TCRs were identified on the project site as a result of this consultation. ln case of unanticipated discovery of tribal cultural resources, staff has incorporated Condition No. 21 (as described above). lmplementation of this condition would ensure that there would not be a significant impact on tribal cultural resources.

Fire/Life Safety
The proposed project proposes to locate two 25O-gallon propane tanks immediately adjacent to the existing metal structure in which the crematorium is proposed. Propane is considered a hazardous material in that is extremely flammable and may cause burns, irritations, and/or asphyxiation if humans come into direct contact with significant quantities of it. Federal and state laws include provisions for the safe handling of hazardous substances. The federal Occupational Safety and Health Administration (OSHA) administers requirements to ensure worker safety. Construction activity must also be in compliance with California OSHA regulations. Further, significant damage to the tanks, failure of safety mechanisms, and/or the presence of an ignition source may make the tanks an explosion hazard. However, the tanks would be secured in place on a concrete pad, marked conspicuously, and placed in an area at low risk of impact from any vehicle or piece of equipment. They would not be located in an area of the cemetery frequented by the public. All installation, maintenance, and operations would be done by trained individuals in accordance with the manufacturer's recommendations and state regulations. The tanks would be regularly inspected to ensure soundness and proper function. Delivery of propane and filling of the tanks would be done only by licensed professionals following all applicable regulations and best practices. Furthermore, the Folsom Fire Department has reviewed the proposed site plan and has provided Condition No. 26 which requires the propane tanks to be a minimum of 10 feet from the metal structure in which the cremations would occur.

City of Folsom Page 13

Page 495 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Fire Station 35 is the nearest station to the project site and is located approximately 1.5 miles east of the project site. The project site is easily accessible to fire service personnel.

Consistent with the City's Multi-Hazard Emergency Management Plan, the City of Folsom maintains pre-designated emergency evacuation routes along major streets and thoroughfares. The proposed project would not modify any pre-designated emergency evacuation route or preclude their continued use as an emergency evacuation route.

Emergency vehicle access would be maintained throughout the project site to meet the Fire Department standards for fire engine maneuvering, location of fire engine to fight a fire, rescue access to the units, and fire hose access to all sides of the building.

The project is not located in or near a State Responsibility Area or in a Very High Fire Hazard Severity Zone. Vegetation on the property is irrigated and includes maintained lawns and well-spaced trees with a generally open canopy and limbs pruned near ground level. The project site is located in an urbanized area in the City of Folsom and is provided urban levels of fire protection by the City. Landscaping on the property is well-irrigated, well-spaced, trimmed, pruned, and generally maintained. To the north of the site is a residential neighborhood, to the east is gravel/rock cover and Folsom Boulevard, and to the south and west is a greenbelt that runs parallel to Lake Natoma on a north/south axis.

The natural spaces are small, with a relatively open and discontinuous canopy. The project is not likely to cause any ignition, given that the crematory will not emit sparks, and any ignition caused by other factors could be quickly controlled by the City of Folsom Fire Department and would not spread great distances given the land use and vegetation surrounding and occupying the site.

As an existing facility, Lakeside Memorial Lawn maintains adequate fire response infrastructure for both current operations and the proposed project. The City of Folsom Fire Department reviewed the project application and did not raise any concerns regarding the adequacy of water supply or site access. The Fire Department also provided Condition No. 24, which requires a fire alarm/detection system if sprinklers are not provided, Condition No. 25, which requires on-site fire hydrants and mains capable of supplying the water flow for fires and Condition No. 26, which requires that combustible materials, trash, weeds and brush are not stored or located within 10 feet of the propane tanks. Furthermore, Condition No. 27 states that a trained operator must be present at all times that the crematorium machine is in operation. Therefore, with these conditions, the proposed project would not expose people or structures to a significant risk of loss due to wildland fires.

Traffic, Access, Circulation and Parking
The project site can be accessed from either northbound or southbound on Folsom Boulevard or from westbound Natoma Street approaching this intersection with Folsom Boulevard. The site would be accessed by proceeding a very short distance west on Forrest Street to reach the entry gate to the cemetery and turning left onto Mormon Street.

Diagonal parking spaces can be found along both sides of Mormon Street. At the terminus City of Folsom Page 14

Page 496 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
of Mormon Street, members of the public may continue straight onto a main cemetery access road to find an additional parking lot. All existing parking spaces would be maintained. Access to the project site directly would continue to be provided by a smaller existing access road located at the southwestern terminus of Mormon Street. Both the smaller access road and the main access road can be reached at the terminus of Mormon Street, but the two roads do not form a continuous loop because of a fence line separating them. No new parking spaces or parking facilities would be constructed.

As the crematorium would not be located in or near a funeral home and would be separate from any funeral services or public gatherings provided by the project applicant, access would only need to accommodate a small number of people at the site. There are a total of g2 parking spaces in the cemetery with room lor 23 additional parking spaces during large events. The applicant has seen an average of 12 to 15 visitors to the cemetery on an average day. The maximum number of visitors under the proposed project conditions would be during large funeral services at the site. However, the 921 parking spaces and overflow parking available on-site are designed accommodate such services.

The City of Folsom identifies most major streets in the City as emergency evacuation routes. The proposed project would not modify any major street and/or preclude their continued use as an emergency evacuation route. The project does not propose any alterations to any access roads, rights-of-way or other routes, and would not increase traffic to a point that additional risk on existing routes would be incurred. Emergency vehicle access would be maintained throughout the project site to meet the Fire Department standards for fire engine maneuvering, location of fire engine to fight a fire, rescue access, and fire hose access to all sides of the building.

Noise
Development of the crematory facility will temporarily increase noise levels in the project vicinity during the construction period. Construction activities, including site work and construction, would be considered an intermittent noise impact throughout the construction period of the project. The City's Noise Ordinance excludes construction activities from meeting the General Plan Noise Element standards, provided that all phases of construction are limited to the hours between 7:00 a.m. and 6:00 p.m, on weekdays, and between 8:00 a.m. and 5:00 p.m. on Saturdays. To ensure compliance with the City's Noise Control Ordinance and General Plan Noise Element, staff recommends that hours of construction operation be limited from 7:00 a.m. to 6:00 p.m. on weekdays and 8:00 a.m. to 5:00 p.m. on Saturdays with no construction permitted on Sundays or holidays. Condition No. 12 is included to reflect these requirements.

Visual lmpacts
The project site is currently a small cemetery, with associated landscaping, outbuildings, and access roads. Lands to the south and west contain woodland habitat typical of riparian communities in the Sierra Nevada foothills. Soils at the project site are comprised of dredge tailings and other fill material. Tailing piles between the site and Folsom Boulevard prevent the site from being visible from that street. To the west is also the City of Folsom Page 15

Page 497 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium ConditionalUse Permit (PN 19-182) February 16,2022
Jedidiah Smith Memorial Trail that runs along the eastern shore of Lake Natoma. To the north is a small residential neighborhood with single family dwellings (The Preserve/Lake Natoma Shores). Folsom Boulevard runs in a north/south line just east of the propedy.

East of Folsom Boulevard is a large, developed area containing single family homes, apartment complexes, a mobile home park, and some small businesses. The more regional setting is primarily characterized by residential development with a commercial shopping center to the east.

The projectwould be located in an existing metalstructure on the grounds of the Lakeside Memorial Lawn Cemetery. The structure would be modified with an exhaust stack added to the roof to accommodate the crematorium, but its footprint would not be expanded. The height of the stack is determined during the SMAQMD permitting process in order to meet their air quality standards. Based on initial consultation with SMAQMD, the stack would most likely be located approximately 19.5 feet above grade and would project up to 10 feet above the existing roof of the structure. The crematory would be placed in the northwest corner of the structure. Two 25O-gallon propane tanks would be installed on a proposed concrete pad along the northern side of the structure to provide power for the crematorium, as no gas lines currently exist. An existing wooden fence would shield these tanks from view from the publicly used areas of the cemetery.

Existing landscaping at the cemetery and around the metal structure consists of mature broad-leaved, coniferous, and palm trees. These trees also provide shade for much of the cemetery and many of the parking spaces. An irrigated lawn surrounds the existing cemetery plots and a smaller lawn surrounds the rear of the structure (i.e., the non-service entrance side). Native oak/gray pine woodland habitat exists surrounding the cemetery.

No new landscaping installation or modification is proposed. Native habitat in the vicinity of the project would not be disturbed.

An existing brick and wrought iron fence marks the edge of the cemetery from the Forrest Street side, but does not extend the length of Mormon Street. A wooden fence currently separates the front side of the metal structure (facing the access road) from the back side and extends both north and south of the structure. The fencing south of the structure further extends to block the access road and restrict access between the lawn to the west of the structure and the access road to the east of the structure. No changes to fencing are proposed as part of this action. The access side of the structure that would be used for crematory operations is shielded from view from the rest of the cemetery by wooden fencing. A gravel berm shields views of the structure from the east, including from Folsom Boulevard.

Neither the project site nor the surrounding areas are scenic vistas due to the presence of existing nearby commercial and residential developments. Further, neither the project site, nor views to or from the project site, have been designated as important scenic resources by the City of Folsom or any other public agency. Additionally, the site of proposed modifications is already largely shielded from public view and would remain so. lmages of the metal structure taken from the edge of the cemetery adjacent to the Lake City of Folsom Page 16

Page 498 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Natoma Shores/Preserve subdivision are provided in Attachment 10. All human remains are transported to or from the crematorium fully shielding the deceased from public view with fully shielded gurneys. The vehicles back up inside the structures' doors to unload the gurney, similar to what is done at the applicant's Miller Funeral Home on the corner of Scott Street and Natoma Street. Given that external modifications would be very minor and that the building is already mostly shielded from view, staff does not anticipate a significant visual impact.

Land Use Com patibility/Site Considerations
The project site consists of a small cemetery, with associated landscaping, outbuildings, and access roads. Lands to the south and west contain woodland habitat. Tailing piles between the site and Folsom Boulevard prevent the site from being visible from that street. To the west is also the Jedidiah Smith Memorial Trail, which is part of the American River Parkway. To the north of the project site is a residential neighborhood with singlefamily dwellings (Lake Natoma Shores/The Preserve). Folsom Boulevard runs in a north/south line just east of the property. East of Folsom Boulevard is a large, developed area containing single-family homes, apartment complexes, a mobile home park, and some small businesses. The more regionalsetting is primarily characterized by residential development with a commercial shopping center to the east.

Staff researched data available from the Sacramento Air Quality Management District regarding the locations of existing crematoriums within the county, their proximity to residential uses, complaints received by SMAQMD for these facilities, and actions taken against these facilities by SMAQMD. Staff found that 16 crematoriums are currently operating within Sacramento County, of which five were located within cemeteries (East Lawn Memorial Park, Sacramento Memorial Lawn, St. Mary Cemetery and Funeral Center, and Sunset Lawn Chapel of the Chimes in Sacramento and Mount Vernon Memorial Park & Mortuary in Fair Oaks). Nine of the crematoriums were within 1 ,100 feet of residential uses, as shown in the table on the following page. lmages of these facilities are provided in Attachm ent 12. Note that the closest residence to the proposed crematorium is 450 feet from the building.

City of Folsom Page 17

Page 499 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
TABLE 1: CREMATORIUMS lN SACRAMENTO COUNTY LOCATED WITHIN 1'100

FEET OF RESIDENTIAL LAND USES
Name of Facility Address Distance to
Residential Uses
East Lawn Memorial
Park
4300 Folsom Blvd. Sacramento 525 ft.

Sacramento Memorial
Lawn
6100 Stockton Blvd. Sacramento 1,100 ft.

St. Mary Cemetery and
Funeral Center
6509 Fruitridge Rd. Sacramento 275 ft.

Sunset Lawn Chapel of
the Chimes
4701 Marysville Rd. Sacramento 600 ft.

Mount Vernon Memorial
Park & Mortuary
8201 Greenback Ln. Fair Oaks 175 ft
Everqreen Memorial 3030 Fruitridqe Rd. Sacramento 90 ft.

North Sacramento
Funeral Home
725 El Camino Ave. Sacramento 100 ft.

Pet Loss Services of
North America
4601 Pell Dr. Sacramento 650 ft.

Sierra View Funeral
Chapel & Crematory
6201 Fair Oaks Blvd. Carmichael 150ft.

All crematoriums in Sacramento County are subject to additional permitting and regular inspections by SMAQMD, who investigates all public complaints about the facilities and fines all facilities for any violations. Three of the facilities listed in the above table have been issued violations from SMAQMD, for a total of 17 violations. Of these violations, four were discharge related. The last discharge-related violation issued by SMAQMD at one of these facilities was in 2010. Five of the facilities listed above have been the subject of public complaints. SMAQMD has received a total of 26 public complaints regarding five of these facilities since 1992. Of these complaints, eight have been received since 2010, predominantly regarding odor and smoke. SMAQMD requires recordkeeping and reporting of all cremations and has the right to inspect cremation facilities at any time, The applicant has also stated that they currently operate two crematoriums in the region, the Lakeside ColonialChapel in Marysville and the Chapelof the Twin Cities in Yuba City, both directly adjacent to residential uses. Given that the proposed project is located 450 to 750 feet away from the nearest sensitive receptors (residences), this is consistent with the location of other crematoriums located in residential areas of Sacramento County as well as the regional crematoriums operated by the applicant.

Based on the analysis presented in the attached staff report and attached lS/MND, staff concluded that there would be a less than significant impact to surrounding land uses with regards to air quality, fire/life safety, traffic, noise and aesthetics. As conditioned, the City of Folsom Page 1 8

Page 500 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium ConditionalUse Permit (PN 19-182) February 16,2022
crematorium would be subject to stringent air quality permitting and monitoring from SMAQMD. The crematorium is also subject to an annual unannounced inspection from the California Cemetery and Funeral Board. Furthermore, staff has provided Condition No. 10 which states that any intensification or expansion of the crematorium will require a subsequent Conditional Use Permit by the Historic District Commission and Condition No. 13 which states that no expansion in number of cremations per day or per year beyond what has been conditioned shall be permitted without prior apprqval being obtained from the Historic District Commission through a Conditional Use Permit. Any increase in air quality or noise impacts beyond what is described in this report is subject to either permit revocation or modification by the commission' With these conditions in place, staff has concluded that the establishment, maintenance, and operation of the proposed use will be compatible with surrounding land uses and will not be detrimental to the health, safety, peace, morals, comfort, and general welfare of persons residing or working in the neighborhood or be detrimental or injurious to property or improvements in the neighborhood, or to the general welfare of the city.

Public Outreach. Noticinq and Comments
Staff routed the initialdevelopment application to relevant localand state agencies. Based on comments received, staff has coordinated with SMAQMD to appropriately condition the project and ensure that the applicant goes through the required SMAQMD permitting process. No other public agencies provided comments. The application was also routed to the Sacramento County Cemetery Advisory Commission, the California Cemetery and Funeral Bureau and the Cremation Association of Northern California. Staff received no comments from these organizations.

A public notice was placed in the Folsom Telegraph on January 6,2022, and notices were mailed to all property owners located within 300 feet of the project site and also to residents who filed written requests for notices, consistent with Government Code sections 65905, 65091, and 65094, as well as CEQA Guidelines sections 15072 and 15105. A public notice was also placed on the project site 30 days priorto the public hearing.

Staff received numerous public comments regarding the project in general and also the IS/MND prior to publication of this staff report. Most comments received were from residents of the Historic District (especially residents of the Lake Natoma Shores/Preserve subdivision) and the Chinese Historical Society of America in opposition to the project, with one letter from a resident expressing support for the project. Written comments received prior to publication of the staff report are included in Attachment 13.

Furthermore, the applicant held a phone meeting for nearby residents to listen to their concerns about the proposed project. lssues brought up in these comment letters and during the applicant meeting include:

City of Folsom Page 19

Page 501 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Air Quality Concerns
. Proximity to residential uses, places where children recreate and impacts to those with compromised lungs and other at-risk populations
Air quality concerns related to particulate matter, CO2, TACs, NOx, and cremated bodies containing mercury from fillings, pacemakers, chemotherapy chemicals and radiation and SMAQMD/Sacramento County's oversight of these pollutants Lack of analysis regarding cumulative air quality effects of the crematory with car fumes on Folsom Blvd.

Whether the crematory would be allowed to operate on days with poor air quality Whether wind would blow smoke into the adjacent neighborhoods Consistency with General Plan air quality goals, especially given that the property is in an existing non-attainment area
Accuracy of meteorological weather data used
Lack of methodology and citations used to justify statements in odor analysis Lack of analysis regarding the Schultz Eddy Phenomenon which causes air to be trapped in the Preserve neighborhood
Need for additional air quality modelling due to varying air pollution patterns Optimal operation of crematory facilities vs. reality
How filters inside smokestack are cleaned
Lack of clarity regarding which agencies regulate and inspect crematories for air quality effects and how those agencies regulate emissions on days they are not testing them
Potential odors during cremation activities, especially on evenings when Code Enforcement staff cannot be present
Lack of maintenance cleanup procedures with regards to runoff, residue and dust Conclusions of the air quality analysis being related to an average healthy human rather than sensitive receptors such as children and the elderly a Whether a rain cover is proposed on the exhaust stack a
a
a
o
a
a
a
o
a
a
o
a
a
a
a
City of Folsom Page 20

Page 502 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Traffic, Girculation, Parking, Wildfire and Life Safety Goncerns Additional traffic in a busy neighborhood due to additional trips for witnessed cremations, propane delivery, and morgue delivery, both in the neighborhood and in the larger Historic District
Amount of people allowed to attend a witnessed cremation Emergency access to the structure in which the cremations are proposed and propane tanks in case of fire
lncreased air quality concerns when cremating bodies with excess weight Evacuation of residents in case of fire on narrow streets accessing many existing uses and frequent light rail crossing
Parking concerns during on-site funeral and witnessed cremation services Lack of analysis regarding cumulative traffic, circulation, and wildfire effects Whether a trained operator would always be on-site in case of malfunction Chances of a propane explosion near historic cemeteries, State parks, and residences
Whether there is room in the metal structure in which the crematorium is proposed for both maintenance equipment and crematory equipment
lnsufficient fencing and security measures at the site
Absence of design measures to create defensible space
Consistency with the Folsom Community Wildfire Protection Plan Whether the recently constructed storage shed was taken into account in the emergency access analysis
Greater evidence that the crematory machine will not produce particles that could ignite a fire
Documented feedback on the project from the Fire Department and California State Parks
a
a
o
a
o
a
o
a
a
a
o
a
a
a
a
a
City of Folsom Page 21

Page 503 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Quality of Life Goncerns
Whether property values would go down as a result of having to disclose that there is a crematory nearby
a
Psychological effects of knowing that cremations are occurring close to residences Concerns over how much cremation noise would be discernable from the nearest residences and to visitors of the cemetery
Whether the smoke stack would be visible from nearby streets and residential yards (and lack of clarity on the height of the stack)
Whether bodies to be cremated would be transferred to the crematory facility in public view
lmpacts to those using nearby trails and recreational areas Whether there would be noise impacts when the crematory machine is running Cultural, Archaeological, Paleontological and Historical/Tribal Resources Goncerns
Potential presence of archeological and paleontological resources on-site Potential smoke impacts to nearby Chinese cemetery, Veteran's Hall, Murer House, and State Recreation Area
Consideration of the Chung Wah Cemetery being placed on the National Register and California Registry of Historic Places and Young Wo Chinese Cemetery being placed on the California Registry of Historic Points of Interest and both cemeteries being placed on the Sacramento County Cemetery Commission's Registry of Pioneer Cemeteries
Cremation not being consistent with Chinese funerary customs and practice and not an integral part of Gold Rush pioneer cemetery customs The presence of the crematorium changing the character and historic significance of a pioneer cemetery
Historical accuracy of a crematory chimney
a
a
a
a
a
a
a
a
o
a
o
a
City of Folsom Page22

Page 504 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Land Use Goncerns
. How a crematory could be allowed in an Open Space zone Compatibility with the Open Space element of the General Plan The use being more appropriate for an industrial or commercial zone The M-2 zone being the only zone that calls out specific uses close to the crematory being allowed, such as pottery kilns and ceramic works Lack of compatibility with an historic use in the historic district . lmpact of people who own cemetery plots and niches in Lakeside Memorial Lawn near the proposed crematory
General and Miscellaneous Concerns
Public noticing and agency noticing irregularities
Whether the City Council should be hearing the project rather than the HDC Whether a design review application is warranted
Public outreach from the applicant
City delays in publishing documentation based on when application was submitted Legal standing of the IS/MND
The Commission's standards of guidance to issue a CUP
Number of cremations per day being proposed and allowed lssues with accuracy of applicant's provided scope of work Conflicting information about whether the crematorium will be accessible to members of the public or just employees
a Whether sewer or bathroom facilities are available at the cremation site a
a
a
a
a
a
a
a
a
a
a
a
a
a
City of Folsom Page 23

Page 505 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
The previous proposalfor a crematory on this site being rejected/withdrawn Historical easements to the Chung Wah cemetery
Location of property lines
a Lack of discussion of recommendations in the 2003 Crematory CUP Time limits and conditions on the 2003 Crematory CUP
Operation of the crematorium changing people's perception of spiritual worship in the Chung Wah and Young Wo cemeteries due to ash and smoke Necessity of the project given other crematories within the general vicinity Applicant starting fencing work and flatwork prior to a decision being made on the CUP
Future growth of the Corporation Yard land
o Whether there is a need for witnessed cremations
lmpacts related to potential increases in neighborhood resources lf heat from the exhaust stack would impact special status bird and bat species nesting nearby
The consideration of performing aquamation (liquid cremation) instead of standard cremations
Statf notes that the air quality, odor, trafficicirculation, parking, wildfire safety, cultural/ archaeological, paleontological and historical/tribal resources, noise and land use concerns have been addressed in the analysis sections of this staff report and the attached IS/MND. Noticing has been completed pursuant to Government Code sections 65905, 65091 , and 65094 as well as CEQA Guidelines sections 15072 and 15105, and the applicant has held a public outreach meeting as described above.

With regards to the previous proposal for a crematorium in 2003 that recommended denial, staff notes that the technology for crematorium machines has improved significantly since 2003 and based on the air quality assessment performed for the o
a
a
a
a
a
a
a
a
o
a
City of Folsom Page 24

Page 506 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn crematorium conditional Use Permit (PN 19-182) February 16,2022
project, staff concluded thatthe airquality impacts of the newly proposed crematorywould not result in the same impacts as the crematorium proposed in 2003. Furthermore, the Sacramento County Cemetery Commission that expressed concern overthe 2003 project did not comment on the current project as proposed.

Finally, staff has concluded that concerns regarding consistency with the General Plan Air Quality and Open Space Goals and Policies and the Historic District Design and Development Guidelines, concerns regarding Chinese and Gold Rush customs, and concerns over a drop in property values will be adequately alleviated by the filtering and burning technology of the proposed crematory machinery as well as the required SMAQMD permitting and monitoring, the shielding of the facility from public view, and the conditions imposed on the proposed project as a part of the Conditional Use Permit, as described in this staff report. Particularly significant to staffs analysis, as detailed above, are the following facts: (1) the crematorium would be subject to stringent air quality permitting and monitoring from SMAQMD; and (2) any impacts beyond those described in this report are not permitted and, if they occur, will subject the applicant to either permit revocation or modification by the Commission.

ENVIRONMENTAL REVIEW
An lnitial Study and Mitigated Negative Declaration, and an associated Addendum, have been prepared for this project (Attachment 11). A detailed summary of the environmental analysis for this project is contained in other sections of this report, with a particular focus on Air Quality. A summary of the environmental analyses on the issues of cultural, archeological, paleontological, and historical/tribal resources; fire/life safety; traffic, access, circulation, and parking; noise; and visual impacts are also included above. Note that an addendum to the initial air quality analysis was also prepared, and has been included both in the final Air Quality section and Appendix B of the IS/MND.

A detailed description of the potential impacts is provided within the lnitial Study for this project, which is included as Attachment 11 to this report. As described above, the Mitigated Negative Declaration includes mitigation measures which, when implemented, will reduce the identified impacts to a less than significant level. These mitigation measures have been included as conditions of approval for this project. Staff points to Conditions 18 through 21 as particularly significant in this regard.

To date, several public comments were received during the Mitigated Negative Declaration public review period which started on January 7,2022 and ended on February 7,2022. Those public comments have been included in Attachment 13. HELIX Environmental will provide responses to those comments for the Public Hearing and on the City's website at the following link: https://www.folsom.ca.us/qovernment/communitvdeve loomenVpl an n i nq-servi ces/cu rrent-proiect-i nform ation City of Folsom Page 25

Page 507 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
Pursuant to AB 52, before the release of the mitigated negative declaration for this project, the City began the process of consultation with any California Native American tribes traditionally and culturally affiliated with the geographic area of the proposed project. The consultation was concluded and no changes to the project were required as a result of the consultation process.

RECOMMENDATION
Based on the information included in this report, staff recommends finding that the proposed crematory is appropriate as an accessory use to the existing cemetery.

Staff also recommends approval of a Conditional Use Permit for the proposed project, based on the information included in this report and the environmental documents in Attachment 11.

HISTORIC DISTRICT COMMISSION AGTION

MOVE TO ADOPT THE MITIGATED NEGATIVE DECLARATION AND MITIGATION

MONITORING AND REPORTING PROGRAM FOR THE LAKESIDE MEMORIAL LAWN CREMATORIUM, PER ATTACHMENT 11;
AND

MOVE TO FIND THAT THE PROPOSED CREMATORIUM IS APPROPRIATE AS AN ACCESSORY USE TO THE EXISTING CEMETERY;
AND
MOVE TO APPROVE THE CONDIIONAL USE PERMIT (PN 19-182) FOR OPERATION OF A CREMATORIUM WITHIN AN EXISTING 1,071-SQUARE FOOT METAL STRUCTURE LOCATED AT 1201 FORREST STREET, WITHIN THE LAKESIDE MEMORIAL LAWN CEMETERY AS ILLUSTRATED IN ATTACHMENTS 5 and 6, WITH THE FOLLOWING FINDINGS (A-K) AND CONDITIONS (NOS. 1-30):

GENERAL FINDINGS

NOTICE OF HEARING HAS BEEN GIVEN AT THE TIME AND IN THE MANNER REQUIRED BY STATE LAWAND CITY CODE.

THE PROJECT IS CONSISTENT WITH THE GENERAL PLAN AND THE ZONING CODE OF THE CITY.

CEQA FINDINGS
A.

B
City of Folsom Page 26

Page 508 ends

05/10/2022 Item No.18.

C
D
Historic District Commission
Lakeside Memorial Lawn Crematorium ConditionalUse Permit (PN 19-182) February 16,2022

A MITIGATED NEGATIVE DECLARATION HAS BEEN PREPARED FOR THE PROJECT IN ACCORDANCE WITH CEQA.

PURSUANT TO AB 52, BEFORE RELEASE OF THE MITIGATED NEGATIVE

DECLARATION FOR THIS PROJECT, THE CITY CONTACTED ALL
CALIFORNIA NATIVE AMERICAN TRIBES ON THE CITY'S AB 52 CONTACT LIST IN ASSOCIATION WITH THIS PROJECT.

THE CITY RECEIVED ONE REQUEST FOR CONSULTATION FROM

CALIFORNIA NATIVE AMERICAN TRIBES AND CONSULTATION WAS
SUBSEQUENTLY CONCLUDED. NO CHANGES TO THE PROJECT WERE
REQUIRED AS A RESULT OF THE CONSULTATION.

THE HISTORIC DISTRICT COMMISSION HAS CONSIDERED THE INITIAL

STUDY, THE PROPOSED MITIGATED NEGATIVE DECLARATION AND ALL

COMMENTS RECEIVED DURING THE PUBLIC REVIEW PROCESS BEFORE MAKING A DECISION REGARDING THE PROJECT.

THE MITIGATED NEGATIVE DECLARATION REFLECTS THE INDEPENDENT JUDGMENT AND ANALYSIS OF THE CITY OF FOLSOM.

THE MITIGATED NEGATIVE DECLARATION HAS DETERMINED THAT THE

PROPOSED PROJECT WOULD NOT HAVE A SIGNIFICANT EFFECT ON THE

ENVIRONMENT WITH THE REQUIRED MITIGATION MEASURES AND THE CONDITIONS OF APPROVAL ON THE PROJECT.

ON THE BASIS OF THE WHOLE RECORD, THERE IS NO SUBSTANTIAL

EVIDENCE THAT THE PROJECT WLL HAVE A SIGNIFICANT EFFECT ON THE

ENVIRONMENT WITH THE REQUIRED MITIGATION MEASURES AND THE CONDITIONS OF APPROVAL ON THE PROJECT.

LAND USE COM TIBILITY FINDING

J AS CONDITIONED, THE PROPOSED CREMATORY IS APPROPRIATE AS AN ACCESSORY USE TO THE EXISTING CEMETERY.

CONDITIONAL USE PERMIT FINDING
K. AS CONDITIONED, THE ESTABLISHMENT, MAINTENANCE AND OPERATION

OF THE USE APPLIED FOR WILL NOT, UNDER THE CIRCUMSTANCES OF

THIS PARTICULAR CASE, BE DETRIMENTAL TO THE HEALTH, SAFETY,

PEACE, MORALS, COMFORT, AND GENERAL WELFARE OF PERSONS

RESIDING OR WORKING IN THE NEIGHBORHOOD, OR BE DETRIMENTAL

OR INJURIOUS TO PROPERTY AND IMPROVEMENTS IN THE
E
F
G
H
City of Folsom Page 27

Page 509 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 1 9-1 82) February 16,2022

NEIGHBORHOOD OR TO THE GENERAL WELFARE OF THE CITY, AS THE

PROPOSED PROJECT WILL NOT HAVE NEGATIVE IMPACTS TO NEARBY COMMERCIAL OR RESIDENTIAL USES THAT HAVE NOT BEEN MITIGATED.

City of Folsom Page 28

Page 510 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 2

BACKGROUND

BACKGROUND
The Planning Commission approved a Use Permit and Variance for Mausoleums at Lakeside Memorial Lawn in 1991 (PC91-042). An amendment to the approval was granted in 1995 (PC95-033). That approval allowed for the construction of twelve mausoleums. To date, two mausoleums have been built. ln 2002, Lorin Claney applied for a Conditional Use Permit for a crematorium at the Lakeside Memorial Lawn (PN 02- 258). Staff routed the project for public review and prepared a staff report recommending denial of the project in 2003, but the applicant withdrew the application before Historic District Commission review. An existing maintenance building (where the crematorium is proposed), approximately 1,071 square feet in area, is located along the south border of the cemetery. The design review for a second 1,600-square-foot maintenance shed was approved by the Historic District Commissionin2020 (PN 20-160) and was subsequently constructed. The site plan associated with this approval showing both structures is provided in Attachment 7.

The applicant for the crematorium proposed in this staff report initially proposed that it be located in the Miller Funeral Home located at 507 Scott Street. Staff expressed initial concern with the crematorium being located directly adjacent to residences. The applicant also coordinated with SMAQMD to determine what measures would need to be taken to locate the crematory adjacent to residences and ultimately decided not to move forward with that location. The applicant then proposed to modify the application for cremations at the Miller Funeral Home to instead perform alkaline hydrolysis (liquid cremations) that would not employ any burning or produce emissions but instead would produce a liquid effluent that would be flushed down sewage pipes. While this method of cremation was approved in California in 2O17, City Environmental and Water Resources staff, in coordination with the Sacramento Regional County Sanitation District, did not have enough local examples of the impacts of these effluents to support this proposal. The applicant subsequently decided to move fonruard with a standard crematorium at the Lakeside Memorial Lawn. The proposed location in the existing metal structure is further away from sensitive receptors than the previous location at the Miller Funeral Home.

The front of the project site is mostly level with a slight to moderate downward slope towards the rear of the site. Lakeside Cemetery has a variety of mature deciduous and evergreen trees. The front of the cemetery, along Forrest Street, is bounded by a brick wall capped with wrought iron fencing. Photographs of the Lakeside Memorial Lawn are included here as Attachment 10. Both the Lakeside Cemetery (including the Odd Fellows and Mason's Cemeteries) and the adjacent Chung Wah Cemetery appear on the City of Folsom's Cultural Resources lnventory. The subject property is located in the Open Space/Public Primary Area of the Historic District, with an underlying zoning of OSC (Open Space and Conservation District).

City of Folsom Page 29

Page 511 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
GENERAL PLAN DESIGNATION OS, Open Space
ZONING
ADJACENT LAND USES/ZONING North
South
East:

West:

SITE CHARACTERISTICS

APPLICABLE CODES
OSiP (Open Space/Public Primary Area),
underlying zoning of OSC (Open Space and
Conservation)
Lakeside Memorial Lawn Cemetery
(OS/P) with single-family residential
subdivision (Lake Natoma
Shores/The Preserve) beyond (PRE)
Vacant land with mine tailings (OSC)
Vacant land with mine tailings (OSC)
with Folsom Boulevard and Folsom
Village Mobile Homes beyond (NRB)
Lakeside Memorial Lawn Cemetery
(OS/P) with Folsom Lake State
Recreation Area (OSC) beyond
The 12.O2-acre project site contains
mausoleums, gravesites, landscaping, a utility
building, mine tailings and a variety of mature
deciduous and evergreen trees. The project
site is generally flat, ranging from about 1751o
185 feet above mean sea level. There are no
wetlands, streams, or jurisdictional features
located on the project site.

FMC Chapter 15.52; HD, Historic District
FMC Section 17.52.550, Open Space/Public
Primary Area Special Use and Design
Standards
FMC Section 17.52.360, Conditional Use
Permit Review
FMC Chapter 17.60, Use Permits
City of Folsom Page 30

Page 512 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 3
Proposed Gonditions of Approval
City of Folsom Page 31

Page 513 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium ConditionalUse Permit (PN 19-182) February 16,2022

GONDITIONS OF APPROVAL FOR

LAKESIDE MEMORIAL LAWN CREMATORIUM CONDITIONAL USE PERMIT (PN 19-r82)
Responsible
Department
cD (B)
cD (B)cD (P)
cD (P)
When
Required
B
OG
B
OG

GENERAL REQUIREMENTS
lssuance of a Building Permit is required. The applicant shall submit final site and building plans to the Community Development Department that substantially conform to the overall site plan, detailed site plan and floor plans dated February 19,2020, included in Attachment 5 and the Outer Dimensions dated August 27,2020, contained in Attachment 6. lmplementation of this project shall be consistent with the above referenced items as modified by these conditions of approval.

Compliance with all local, state and federal regulations pertaining to building construction and demolition is required.

This approval is for operation of a crematorium within an existing 1,071-square foot metal structure located at 1201 Forrest Street, within the Lakeside Memorial Lawn cemetery.

The applicant shall submit building plans that substantially comply with this approval andthe site plan and floor plan dated February 19,2020, included in Attachment 5 and the Outer Dimensions dated Auqust 27,2020, contained in Attachment 6. lf the Community Development Director finds evidence that conditions of approval for theLakeside Memorial Lawn Crematorium Conditional Use Permit have not been fulfilled or complied with, that the use has resulted in a substantial adverse effect on the health,and/or general welfare of users of adjacent or proximate property, or has a substantialadverse impact on public facilities or services, the Director will refer the use permit to the Historic District Commission for review. lf, upon such review, the Historic District Commission finds that any of the above-stated results have occurred, the Commission mav modifu or revoke the Conditional Use Permit.

Mitigation
Measure
Cond.

No
2 )4.

City of Folsom Page 32

Page 514 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
cD (P, B)
cD (PXEXB)

PW, PR, FD,
PD

DEVELOPMENT COSTS AND FEE REQUIREMENTS
cD (PXE)
B
OG
B
This project approval shall remain in effect for one year until February 16,2023. Failureto submit a complete application for the relevant building permits within this time period,without the subsequent extension of this approval, or failure to vest the Conditional Use Permit within the identified time frame prior to the expiration date and the applicant hasnot demonstrated substantial progress towards the development of the project, shallrender this approval null and void. The owner/applicant may file an application with the Community Development Department for a permit extension not less than 30 days prior to the expiration date of the permit, along with appropriate fees and necessary submittal materials pursuant to Chapter 17.60 of the Folsom Municipal Code.

The owner/applicant shall defend, indemnify, and hold harmless the City and its agents, officers and employees from any claim, action or proceeding against the City or itsagents, officers or employees to attack, set aside, void, or annul any approval by the Cityor any of its agencies, departments, commissions, agents, officers, employees, or legislative body concerning the project. The City will promptly notify the owner/applicant of any such claim, action or proceeding, and will cooperate fully in the defense. The City may, within its unlimited discretion, participate in the defense of any such claim, action or proceeding if both of the following occur: . The City bears its own attorney's fees and costs; and . The City defends the claim, action or proceeding in good faith The owner/applicant shall not be required to pay or perform any settlement of such claim, action or proceeding unless the settlement is approved by the owner/applicant.

The owner/applicant shall pay all applicable taxes, fees and charges at the rate and amount in effect at the time such taxes, fees and charqes become due and payable. 5 6
7 City of Folsom Page 33

Page 515 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
cD (PXE)
cD (PXE),
PW, PK

CONDITIONAL USE PERMIT REQUIREMENTS
cD (P)
cD (P)cD (P)cD (P)
cD (P)
CD

AIR QUALITY REQUIREMENTS
B
B
B, OG
OG

OGOGOGOG
The City, at its sole discretion, may utilize the services of outside legal counsel to assist in the implementation of this project, including, but not limited to, drafting, reviewing and/or revising agreements and/or other documentation for the project. lf the City utilizes the services of such outside legal counsel, the applicant shall reimburse the City for all outside legal fees and costs incurred by the City for such services. The applicant may be required, at the sole discretion of the City Attorney, to submit a deposit to the City for these services prior to initiation of the services. The applicant shall be responsible for reimbursement to the Citv for the services reqardless of whether a deposit is required.

This project shall be subject to all City-wide development impact fees, unless exempt by previous agreement. This project shall be subject to all Citywide development impact fees in effect at such time that a building permit is issued. These fees may include, but are not limited to, fees for fire protection, park facilities, park equipment, Quimby, Humbug-Willow Creek Parkway, Light Rail, TSM, capitalfacilities and traffic impacts.

The 90-day protest period for allfees, dedications, reservations or other exactions imposed on this project has begun. The fees shall be calculated at the fee rate in effect at the time of buildinq permit issuance.

Any intensification or expansion of the use approved and conditioned herein will require a subsequent Conditional Use Permit Modification by the Historic District Commission.

No approvals are granted in this Gonditional Use Permit except as provided.

All conditions of the original Conditional Use Permit (PC91-042 as modified by PC 95- 033) are incorporated by reference.Compliance with the City of Folsom's Noise Control Ordinance (Folsom Municipal CodeChapter 8.42) and General Plan Noise Element shall be required.

No more than four cremations shall occur per day and no more than 500 cremations shall be performed each year. No expansion in number of cremations per day or per year beyond what is stated above shall be permitted without prior approval being obtained from the Historic District Commission through a Conditional Use Permit Modification.

The building in which the crematorium is located shall remained locked at alltimes when a cremation is not occurrinq.

This Conditional Use Permit shall be deemed revoked without further action by the Historic District Commission if the operation of the facility in the manner described in the Conditional Use Permit ceases for anv consecutive period of six (6) months. 8 9
1011
12t3

14.15 City of Folsom Page 34

Page 516 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182)February 16,2022 An authority B cD (P, B) to construct and permit to operate (A/C, PTO) shall be obtained from the Sacramento Metropolitan Air Quality Management District (SMAQMD) prior to thecommencement of equipment installation. As part of this process, SMAQMD will determine if the emissions from the propane combustion and toxic emissions meet applicable rules and Best Available ControlTechnology (BACT) requirements, as well as the NAAQS 8-Hour Ozone Attainment and Reasonable Further Progress Plan (Regional Ozone Plan). A building permit will not be issued until an A/C, PTO has been obtained.Compliance with the SMAQMD A/C, PTO and the maintenance of such permits in goodstanding are requirements for validity of this Conditional Use Permit and the failure to comply with such permits and/or to maintain such permits in good standing shall trigger the process described in Condition of Approval No. 4.

I 6
City of Folsom Page 35

Page 517 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium ConditionalUse Permit (PN 19-182) February 16,2022
The DC cD (E) following SMAQMD Basic Construction Emission Control Practices shall be implemented throughout construction activities: . All exposed surfaces shall be watered two times daily. Exposed surfaces include, but are not limited to soil piles, graded areas, unpaved parking areas, stagingareas, and access roads. . Cover or maintain at least two feet of free board space on haul trucks transportingsoil, sand, or other loose material on the site. Any haul trucks that would be traveling along freeways or major roadways shall be covered. . Use wet power vacuum street sweepers to remove any visible trackout mud or dirt onto adjacent public roads at least once a day. Use of dry power sweeping is prohibited. . Limit vehicle speeds on unpaved roads to 15 miles per hour. o All roadways, driveways, sidewalks, parking lots shall be paved as soon as possible. ln addition, building pads shall be laid as soon as possible after gradingunless seeding or soil binders are used. . Minimize idling time either by shutting equipment off when not in use or reducing the time of idling to 5 minutes (as required by the state airborne toxics control measure [Title i3, Section 2485 of the California Code of Regulations]). Provide clear signage that posts this requirement for workers at the entrances to the site. . Maintain all construction equipment in proper working condition according to manufacturer's specifications. The equipment shall be checked by a certifiedmechanic and determine to be running in proper condition before it is operated. 17 City of Folsom Page 36

Page 518 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 1 9-1 82) February 16,2022

CULTURAL, ARCHAEOLOGICAL, PALEONTOLOGICAL AND HISTORICAUTRIBAL RESOURCES REQUIREMENTS G, cD (PXE)(B) Prior to the initiation of ground disturbing activity, a qualified professional archaeologist ,B shall be retained to develop and deliver a contractor awareness training program to construction supervisors. The purpose of the training is to ensure that contractors areaware of the need to limit their activity, including equipment storage, staging, parking,and ground disturbance to only those locations identified as work areas on the official site plans.

Prior to the initiation of ground disturbing activity, a qualified professional archaeologist shall be retained to monitor the installation of temporary high-visibility exclusionary fencing along the toe of existing mine tailings features adjacent to the shed. The fencing shall remain in place until all project activities are completed. City inspectors shall include a verification of the fencing during all required inspections. ln the event that exclusionary fencing has failed, the construction supervisor must re-install or repair the fence within 24 hours.
18 City of Folsom Page 37

Page 519 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182)February 16,2022 G, cD (PXEXB) lf subsurface deposits believed to be cultural in origin are discovered during construction, ,B all work must halt within a S0-foot radius of the discovery. A qualified professionalarchaeologist, meeting the Secretary of the lnterior's Professional QualificationStandards for pre-contact and historic archaeologist, shall be retained to evaluate thesignificance of the find, and shall have the authority to modify the no-work radius as appropriate, using professional judgment. The following notifications shall apply,depending on the nature of the find: . lf the professional archaeologist determines that the find does not represent a cultural resource, work may resume immediately, and no agency notifications are required.
lf the professional archaeologist determines that the find does represent a cultural resource from any time period or cultural affiliation, he or she shall immediately notify the City to consult on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 1506a.5(a) of the CEQA Guidelines or a historic property under Section 106 NHPA, if applicable. Work may not resume within theno-work radius untilthe City, through consultation as appropriate, determines that the site either: 1) is not an Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to its satisfaction.
a
t9
City of Folsom Page 38

Page 520 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182)February 16,2022 lf subsurface deposits believed to be cultural or human in origin are discovered during G, I,B cD (PXEXB) construction,.all work must halt within a 5O-foot radius of the discovery. A qualified professional archaeologist, meeting the Secretary of the lnterior's ProfessionalQualification Standards for pre-contact and historic archaeologist, shall be retained to evaluate the significance of the find, and shall have the authority to modify the no-work radius as appropriate, using professionaljudgment. The following notifications shall apply, depending on the nature of the find:
lf the find includes human remains, or remains that are potentially human, he or she shall ensure reasonable protection measures are taken to protect thediscovery from disturbance (AB 2641). The archaeologist shall notify the Sacramento County Coroner (per $7050.5 of the Health and Safety Code). The provisions of $7050.5 of the California Health and Safety Code, 55097.98 of the California PRC, and Assembly Bill2641 will be implemented. lf the Coronerdetermines the remains are Native American and not the result of a crime scene, the Coroner will notify the NAHC, which then will designate a Native American Most Likely Descendant (MLD) for the project (55097.98 of the PRC). The designated MLD will have 48 hours from the time access to the property isgranted to make recommendations concerning treatment of the remains. lf the landowner does not agree with the recommendations of the MLD, the NAHC canmediate (55097.94 of the PRC). lf no agreement is reached, the landowner mustrebury the remains where they will not be further disturbed (55097.98 of the PRC). This will also include either recording the site with the NAHC or the appropriate lnformation Center; using an open space or conservation zoningdesignation or easement; or recording a reinternment document with the county in which the property is located (AB 2641). lf the Coroner determines that theremains are human but are not Native American, then the Coroner will direct subsequent steps to address the discovery. Work may not resume within the nowork radius untilthe City, through consultation as appropriate, determines that the treatment measures have been completed to its satisfaction. a

20. City of Folsom Page 39

Page 521 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182)February 16,2022 cD (PXEXB)
cD (PXEXB)

FIRE AND LIFE SAFETY REQUIREMENTS
cD (F)cD (F)
G, I,B
G, I,B
OG
o
lf potentially significant Tribal Cultural Resources (TCRs) are discovered during ground disturbing construction activities, all work shall cease within 50 feet of the find. A Native American Representative from traditionally and culturally affiliated Native AmericanTribes that requested consultation on the project shall be immediately contacted and invited to assess the significance of the find and make recommendations for further evaluation and treatment, as necessary. lf deemed necessary by the City, a qualified cultural resources specialist meeting the Secretary of lnterior's Standards andQualifications for Archaeology, may also assess the significance of the find in jointconsultation with Native American Representatives to ensure that Tribal values areconsidered. Work at the discovery location cannot resume untilthe City, in consultationas appropriate and in good faith, determines that the discovery is either not a TCR, or has been subjected to culturally appropriate treatment, if avoidance and preservationcannot be accommodated. lf any archaeological, cultural, or historical resources or artifacts, or other features are discovered during the course of construction anywhere on the project site, work shall be suspended in that location until a qualified professional archaeologist assesses thesignificance of the discovery and provides consultation with the Folsom HistoricalSociety, City staff, and the Heritage Preservation League. Appropriate mitigation as recommended by the archaeologist and the Historical Society representative shall beimplemented. lf agreement cannot be met, the Historic District Commission shall determine the appropriate implementation method.Current occupancy loads shall be posted at alltimes, and the owner/applicant shall have an effective system to keep count of the number of occupants present at any given time.

This information shall be orovided to oublic safetv oersonnel upon request.The building in which the crematorium is located shall be provided with an approved monitored fire alarm/detection system when the building is not protected by an automatic sprinkler svstem in accordance with the Folsom Municipal Code Section 907.9.1. 2t
22 2324
City of Folsom Page 40

Page 522 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182)February 16,2022 cD(F)
cD (F)
cD (P)

OTHER AGENCY REQUIREMENTS
o
o
o
On-site fire hydrants and mains capable of supplying the fire flow shall be provided inaccordance with the 2019 California Fire Code (CFC) Section 507 Fire Protection Water Supplies: An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions ofbuildings are hereby constructed or moved into or within the jurisdiction, including the structure where cremations are proposed as a part of this project. Where a portion of a facility or building constructed is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the fire flow shall be orovided where required bv the fire code official. CFC 507 lnstallation of the propane tanks shall comply with the following:
a. There shall be no more than two propane tanks with capacities of no more than 250 gallons each.
b. The installation shall conform to 2019 CFC, Chapter 61, and 2014 National Fire Protection Association (NFPA) Standard 58. c. The container installation shall conform to Sec. 6.6.3, NFPA 58, which requires a minimum 1O-foot separation distance between the 25O-gallon propane tanks and the building in which the crematorium is located. d. Piping shall be installed per Section 6.9, NFPA 58, and tested per Section

6.14. e. Combustible materials, trash, weeds and brush shall not be stored or located within 10 feet of the propane tanks. CFC 6107.3 & NFPA 58:

6.4.4.3 f. lf the point of transfers for the propane tanks are not located at the tanks, they shall be located in accordance with NFPA 58: Table 6.5.2.1. g. Support of the propane tanks shall comply with NFPA 58: 6.3.3(4) through

6.3.3(D). h. Steel supports shall be protected against fire exposure with materials having a fire resistance rating of at least 2 hours if the height limits specified in NFPA 58: Table 6.3.3(4) are exceeded.

A trained operator shall remain on-site at alltimes that the crematorium machine is in operation.
25 26
27 City of Folsom Page 41

Page 523 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182)February 16,2022 cD (PXE)
cD (P)
cD (PXE)
I, G
t, B OG
The owner/applicant shall obtain and continually maintain in good standing all required State and Federal permits and provide evidence that said permits have been obtained, or that the permit is not required, subject to staff review and approval. Compliance with all required State and Federal permits and the maintenance of such permits in good standing are requirements for validity of this Conditional Use Permit and the failure to comply with such permits and/or to maintain such permits in good standing shall trigger the process described in Condition of Approval No. 4.

The owner/applicant shall obtain permission (permit, letter, agreement, etc.) from all applicable public utility companies (SMUD, PG&E, WAPA, etc.) in a form acceptable to the Community Development Department for construction-related activities proposedwithin the existinq public utilitv easements.

The proposed project shall comply with all State and local rules, regulations, Governor's Declarations, and restrictions including but not limited to requirements relative to waterusage and conservation established by the State Water Resources Control Board, and water usage and conservation requirements established within the Folsom Municipal Code, (Chapter 13.26 Water Conservation), as amended from time to time. 28 2930

WIIENREQUIREI)
Prior to approval of Improvement PlansPrior to approval of Final MapPrior to issuance of first Buildins PermitPrior to aonroval of Occunancv PermitPrior to issuance of Grading PermitDurins construction On-going requirement
I
MB
oG
DC
OG

RESPONSIBLE DEPARTMENT
Community Development Department
Planning DivisionEngineering DivisionBuilding DivisionFire Division Public Works Department
Park and Recreation Department
Police Department

CD(P)(E)(B)(F)PWPRPD
City of Folsom Page 42

Page 524 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 4
Vicinity Map

Page 525 ends

05/10/2022 Item No.18.
ld
t
H
lt
{"'
,:!
Chfi:fft;rrilfrftr'rf64*
&
HH
8'&e$ils
I &!
I
E
"S.
--_
-r*".S,1_ {
# g
fi _".
tj'"'
,
strft&r&fftif
E
E
$f"{rfrff E
B
, 4 .i,M
J
I
n
,.'

Page 526 ends

05/10/2022 Item No.18.

Historic District Comm ission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 5
Overall Site Plan, Detailed Site Plan and Floor
Plan, Dated 2-19-20

Page 527 ends

05/10/2022 Item No.18.

A1 .0
l.EY

DESICNS

VADIM ZANKO
7844 MADISON AVE
STE 106 FAIR OAKS, CA
95528
916-312-2131
suppod@lev&signs.com ,/ ,, ")
,;r!1"'

LAKESIDE IVIEMORIAL
LA\IJN CEIVIETERY
.1201 FORREST ST
FOLSOM
cA 95630
0700260001 0000

PROJECT DESCRIPTION & SCOPE OF WORK
1700260m10@0osc
523591SO ff/1202ACRES
.ONING
sEEE.OE.UgB!
FOLSOM, CA 95630
1201 FORREST ST
IN

PROJECT DIRECTORYDESIGNER

VADIMANKO

LEV DESIGNS
(916)J12-2131
[email protected]
OWNER

SHEET INDEX
SHEfl DESCRIMON

BUILDING INFORMATION ABBREUANONS

SQUARE FOOTAGE BREAKDOWN

SAUARE F

SPECIAL INSPECTIONS

DEFERRED SUBMITTALS

SEPARATE PERMIT

VICINITY MAP
NX,S,

Page 528 ends

05/10/2022 Item No.18.

42.0 LAKESIDE MEMORIAL
LAV1N CEMETERY
1201 FORREST ST
FOLSOM
cA 95630
07002600010000
s. uE Pei?@
;Deeffi
lEy OESIGNS

VADIM ANKO
7& MADISON AVE
S]E 106 FAIR OAKS, CA
9S28
91ffi122131
[email protected]
i;l
PATCH LEGEND:

MOffift UNE
2- *BNN6AU
q\q:

EXKiresT@P/UUN n
./o$ \-\ fJ -g?-- dFf,NGREE -- d-t \-
-a, ___- --- \_\- \- \ {I !
I
I
t:

I
"iqF_: \
.#
\ -:-
' t' ''s +" \-\ *,
-/ I
"+ -,1 i _-"2- 1: ./ r i ./'/ t"
./'
I
I
-/' I
I
I
I,t\
I
I a
I ! ,'' il ,,|
/
s., I "+d- . !:.
.El
.d-
:3, in ?
t4oR6
*.. I q- J'-' t\ jt
",' I'i
I I '",-t- i-'
st - _,i;, -distqrr
\ /I
{ -9
t
@
+
.TI'EE AI I QITtr DI AII ,tn - an'

Page 529 ends

05/10/2022 Item No.18.

M' NE M4trFr
A2.1

LAKESIDE MEMORIAL

LAWN CEMETERY
1201 FORREST ST
FOLSOM
cA 95630
07002600010000
LEy DESICNS

VADIM ZANKO
7844 MADISON AVE
STE 1M FAIR OAKS, CA
95628
91&312-2131
supFi@levdsigns-com
,'i;)
S1
--.-\
(N) 2 X 5OO GALLON PROPANE TANKS
Pd-- +:so, 6o, <c; I 'l
LEGEND:
flFNNGARS
(E) STRUCTURE
asts! - -/'
PATCHEXFnreEXISING GEE
o
(E) STRUCTURE
o
t+
-"'
(E)
)-
ri
I
'. ' X'a
I
I
l
l
/
I
(
I
/
_l !+c?t
;/
I
l
I
I
I
I
I
I
{
(E) SHED
hETAII EN CITtr DI AN

Page 530 ends

05/10/2022 Item No.18.

43.0 lEy DESIGNS

VMIMANKO
784 MADISON AVE
STE 16 FAIR OAKS, CA
95628
918312-2131
[email protected]
/t
LAKESIDE MEI\iIORIAL

LAVI/NI CEMETERY
1201 FORREST ST
FOLSOM
cA 95630
0700260001 0000
(N) CREMTORY
{N) COOLER
"t
(E) SHED
4 ttn 4r nrr
FLOOR PUN NOES: LEGEND WAI LEGEND PUN ARA SOUARE FOOTAGE BRSKOOWN:
qtsTtNG SHEDRil 1,071 SO. tr

Page 531 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 1 9-1 82) February 16,2022
ATTACHMENT 6
Hartwick Gombustion Technologies Floor Plan,
Outer Dimensions and Specs

Page 532 ends

05/10/2022 Item No.18.

Floor Plan Drawn By: PH Model: APEX 250

30.00 in
l0.t
o
Plan View
Itr
Side View
I15.il) in
ln
lin
IEI
Front View
{o
@Uu.t*ick Combustion Technologies, Inc. All Rights Reserved Date Drawn:8177/20

Page 533 ends

05/10/2022 Item No.18.

Rain
Test Port
Stainless Steel Exhaust Stack

30.0{r in
2n' Ceramic Fibre Insulated
Side View
Harfwick Combustion Technologies, Inc.

APEX 250
Top View of Mechanical features

90.00 in
Combustion
Exhaust
After Burner
Throat Air

36.00 in
Arch Air
Hearth Air l2eooin
Burner
Panel C Door - I I 15,00 in Page 534
05/10/2022 Item No.18.

Hartwick Combustion Technologies, lnc.

Apex-250 XP
High Efficiencv
Average cycle time 60 minutes
Secondary chamber t2O cu/ft
Natural gas / propane
Length 175"
width 90"
Height 115"
Weight 35,0001bs
2,500,000 BTU
1 Charging door
l- Rear door/Retrieval
2 Primary burners
1 Secondary burner
Self cooling exterior walls
Continuous operation
230 Volt l-phase / 3 phase
Oversized chamber
1000 lbs maximum load
Quiet operation 60 DB range
5-8 cases in 8 hours
Apex-250
Hieh Production
Average cycle time 90 minutes
Secondary chamber 90 cu/ft
Natural gas / propane
Length 140"
width 90"
Height 1l-5"
weight 32,000 lbs
2,000,000 Uncontrolled BTU
1,800,000 Controlled BTU
1" Charging door
1 Primary burner
1 Secondary burner
Self cooling exterior walls
Continuous operation
230 volt l-phase / 3 phase
1000lbs maximum load
Quiet operation 60 DB range
4-6 cases in 8 hours
Business Office; 3533 San Gabriel River Parkway, Pico Rivera, Ca90660 (800)816-91 25 Fax (562)922-830s
E-mail; info@hartwickcombustion. com

Page 535 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTAGHMENT 7
Updated Site Plan with Gurrent Layout of
Maintenance Area

Page 536 ends

05/10/2022 Item No.18.
g-. *r**"'*

42.1 LAKESIDE MEMORIAL
TA\AAI CEMETERY

NEW STORAGE SHED
1201 FORREST ST
FOLSOM
cA 95630
07002500010000
lEY
DESIGNg

VADIITI ZANKO
78& MADISON AVE
STE 106 FAR OAKS. CA
95628
916-312-2131
suppod@lev&signs.com /2

SIGNATURE
SHEET INDEX:

SHEETA2,1-AFNreSIE PUNCALIFORMAAI$EEL ETINEER|NG PACSGa (OmWNG rc] MBO3€@EE9q CODE GOVERNED:

A[ NEW rcRK SHAIL COMPLY WB 2O1S CBC AN'AW LOCALAMENDMEM SCOPE OF WORK:CONSNUCT A NEW S'ORAGE SHEO FOR SIORAGE NO CHEMIilL STOR€O.

I -q e- bol
Iri
t
o
I
l
I
/
I
It\
t\
c
(E)
(E) STRUCTURE P-
-7
(E) STRUCTURE
A4oR14oN
Gr eg
-,(e\-*\2/
-/"t"
93, S1
o
v
G)
l8\ 9?:

LEGEND:EXENre FUT
.-**"tJfrRf'Bt"S'
tr$Pse EXISTINGNEE
ln"
(E) SHED
t(N) SHED
\
{
trYIqTINt? SITF DI AN
NOTES:NO EECNIdLAND PIUMBING rcRKS IWOLVEON THS SCOPE OF PROJECT

Page 537 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 8
Applicant's Rendering of Proposed
Grematorium Stack

Page 538 ends

05/10/2022 Item No.18.

Page 539 ends

05/10/2022 Item No.18.

Page 540 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 9
Applicantos Narrative

Page 541 ends

05/10/2022 Item No.18.
::.€*

LAKESIDE
N{EMORIAL LA\MN
Scooe of Work- lnstalling a Crematory
We are proposing to install a Hartwick Apex 250 Human Crematory at our existing shed in our cemetery Lakeside Memorial Lawn 120L Forrest St Folsom CA 95630. lntroduction
Lakeside MemorialLawn hasexisted since 1850. lt has been a large partof the historyof the cityof Folsom and remains to be a part of the future of the city of Folsom. lt is privately held and operated by family, who currently reside in Folsom and have a long heritage in Folsom. Lakeside Memorial Lawn alongside Miller Funeral Home have over 150 years in service to the community.

The Claney and Semenyuk family has a combined experience of 100 years in the funeral industry.

Residents of Folsom and active partners in the community, local ordinances and the Folsom Police Department in Every 15 Minutes Program. We also own Caring Service Group, which has 8 funeral homes from Clear Lake to Arroyo Grande. With four crematories in four separate cities. Coordinating with their respected cities and local air ordinances, Caring Service Group has been successful in operating and installing these crematories. They have been in operation for the last 10 years and have not received one complaint against their licensing as they continue to operate at full capacity. All four crematories are inside the funeral home buildings, which is an impressive feat on its own. These crematories have facilitated thousands of cremations and will continue to do so. This is to demonstrate the knowledge, professionalism and ethical practices we uphold when we install and operate crematories.

Point at lssue
There are several large cultural communities residing and moving into Folsom. Regretfully, we do not have the ability nor the capability to serve the Sikh, Hindu, Buddhist or other cremation-based cultures as they require an on-site crematory so that they may be able to exercise their funeral rights and customs. Currently, there is no crematory in the city of Folsom, so they must find these services outside their city.

Page 542 ends

05/10/2022 Item No.18.

The increase in homes being built in the city of Folsom, including Folsom Ranch, we need to have an onsite crematory in order to facilitate it's increase in cremation service. Folsom tax paying residents are unable to choose cremation disposition to be performed locally.

California currently has a cremation rate of 66.7 percent and will increase to 80 percent by 2030. Since 2019 the city of Folsom has an estimated 450 deaths a year and rising as the population increases, That is an estimated 300 cremations needed to be performed every year, Our Prooosition
The crematory placement at Lakeside Memorial Lawn is a strategic placement, lt is removed from any residences, parks, or schools, lt is not in eyesight of any homes, business's or restaurants. lt will be inside the existing shed of Lakeside Memorial Lawn, surrounded by the rock piles of Folsom. As the only operationalcemetery in Folsom, it is governed by the California Funeral and Cemetery Bureau and crematories fall under its' jurisdiction in licensing and on-site inspections.

As the cemetery does not have a gas or sewer line, we will be installing two propane tanks to facilitate the energy needed for the machine. lt is a simple and cost-efficient option' Cremation Process
A small explanation of cremation and its process.

Once paperwork - death certificate and local disposition permit is filed, with the family's permission and consent, we can then proceed with cremation.

Through a very strict identification process, we take the remains of John Doe and place them in a cremation container. lt is identified again, weighed and recorded into the crematory log.

The machine or Cremator is started and heated up to a degree that the local air quality board decrees necessary for the area, prior to remains being placed into the main chamber. Usually ranges from L100- 1600 degrees Fahrenheit, A Cremator has two burners, a main burner which is directly over the middle of the main chamber and a back burner, which is in the back in the second chamber.

The function of the second chamber is to initially heat up the machine and to incinerate any particles that escape the main chamber during the cremation process. That way there is no smoke or residue that leaves the chamber.

The main burner is there to facilitate the cremation process. lt continues to heat up the main chamber and maintains a consistent temperature that allows the water in the subject to evaporate.

Once the Cremator reaches the set temperature, the cremation container is then rolled inside the main chamber. When the door opens, the main burner shuts off for safety reasons. That prevents any harm to the crematory operator and facility. The door is then shut and after a few minutes the main burner starts again and thus begins the cremation process.

Page 543 ends

05/10/2022 Item No.18.

This process isself-operatingand does not require anything else apart from time. The usual time cremation takes is an average of 2 hours for the combustion process to be complete. lt is a selfcontained and safe process from start to finish.

The side door is opened, and the remains are collected and placed to cool down. Once cool, they are processed through a processor and placed into a plastic bag that is identified and sealed. The bag is placed into an urn and sealed. The urn is identified with name, date of cremation and the crematories license number. All this information is logged into the crematory book that is overseen by the CA State Funeral and Cemetery Bureau.

Usual Safetv Concerns
ln the process of any errors or malfunction, there are safety features installed. ln the event of an operationalfailure, the gas is immediately and automaticallyshut off. There is a manual switch aswell.

There has never been a crematory blowing up in the history of cremation.

We buy our machines from a very reputable, if not the best in the cremation industry manufacturer called Hartwick Combustion Technologies. They are manufactured in California, are designed to use less fuel, have lower NOx emissions, is NFPA compliant, meets Air Quality standards and the components used are UL listed.

We have one of their machines located within out Lakeport funeral home and we have not had one issue or complaint. We trust in the safety and manufacturing of these machines and ourselves hold years of experience in the cremation industry with our own high safety standards.

Scope of Work
We are hoping to get a use permit from the city of Folsom to operate our very own Hartwick Apex 250 Human Crematory. To accomplish this, we will be working side by side with the city of Folsom, Sacramento Air Quality Board and the CA Funeral and Cemetery Bureau to meet all necessary standards, laws and regulations in order to complete said application and Use permit.

Once we are issued the Use Permit from the city of Folsom, we will go ahead and install the Cremator inside the existing shed at Lakeside Memorial Lawn.

We will have it lifted with a crane off the truck and rolled inside the shed. Once in the proper place, the stack will be installed, and the electrical/propane lines connected by its respected professionals. The CA Cemetery and Funeral Bureau will do a final inspection and they will issue a crematory license. At that point we will be operational, and the city of Folsom will have its first crematory.

We have done this process twice in two other cities and we look forward to doing this in the city we live in.

Page 544 ends

05/10/2022 Item No.18.
lf you have any questions or require more information, please contact me lgor Semenyuk
Chief Operating Officer/Partner
igor@ca ringservicegroup,com
o. 916-985-2295
M.916-548-6808

Page 545 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 1O
Photographs of the Project Site

Page 546 ends

05/10/2022 Item No.18.

VIEW OF MAINTENANCE AREA FROM INSIDE CEMETERY

Page 547 ends

05/10/2022 Item No.18.

W
VIEW OF MAINTENANCE AREA FROM INSIDE CEMETERY Page 548
05/10/2022 Item No.18.
rt

VIEW OF MAINTENANCE AREA FROM CEMETERY PARKING LOT

Page 549 ends

05/10/2022 Item No.18.

VIEW OF MAINTENANCE AREA FROM OUTER EDGE OF CEMETERY NEAR PRESERVE

Page 550 ends

05/10/2022 Item No.18.

INTERIOR VIEW OF MAINTENANCE AREA

Page 551 ends

05/10/2022 Item No.18.

I
I
#".i,,.
.:

VIEW INSIDE STRUCTURE FOR PROPOSED CREMATORIUM

Page 552 ends

05/10/2022 Item No.18.
-t,
ll.

I
F+
!
:$r.'='
fitu
f' "g ,.*

VIEW OF MAINTENANCE AREA FROM THE PRESERVE SUBDIVISION

Page 553 ends

05/10/2022 Item No.18.
ffi,
:'
,l l' 3 ,r{ I .},;' '!,f
I
fi'r 4
-,1 f ttin'
'. l.L
Ff
frEt.i,+ryj
d,
L-* .*.,.' '*
t
{ii
!l
II
II;s
s
$r: ..6
'f.r.r ti ti
l!
4! grI
at
!r
iJ
:
ln
{th
{
t:tr
Il, :!
t;
ii,

9.!
'1
It
)
'I
; +ii:r'r . -.' :r
." f ':|*

VIEW OF MINING TAILINGS FROM MAINTENANCE AREA

Page 554 ends

05/10/2022 Item No.18.

VIEW OF MINING TAILINGS FROM FOLSOM BOULEVARD AND FORREST STREET

Page 555 ends

05/10/2022 Item No.18.

Historic District Commission
Lakeside Memorial Lawn Crematorium Conditional Use Permit (PN 19-182) February 16,2022
ATTACHMENT 11
Draft Initial Study/Mitigated Negative Declaratioh,
Dated January 2022

Page 556 ends

05/10/2022 Item No.18.

Lokeside Memoriol Lown
Cremotorium
lnitiol Study/Mitigoted Negotive Declorotion
Prepored by:

City of Folsom
Community Developmenl Deportmenl
50 Notomo Street
Folsom, CA 95630
With Technicol Supporf by:

HEIIX Environmenlol Plonning, lnc.

I I Notomo Street, Suite .l55
Folsom, CA 95530
Jonuory 2022

Page 557 ends

05/10/2022 Item No.18.

TABTE OF CONTENTS
Section

1.0 tNTRODUCT|ON....................

2.O PROJECT BACKGROUND........

3.0 PROJECTDESCRIPTION..

3.1- ProjectLocation......

3.2 Project Setting and Surrounding Land Uses...........,

3.3 ProjectCharacteristics..

Parking and Circulation
Emergency Vehicle Access ........

Utilities
Landscaping
Fencing
Grading...

3.4 City Regulation of Urban Development ...............

General P|an.......

Zoning Ordinance...

3.5 Other City Regulation of Urban Development.........

Community Development Department Standard Construction Conditions...

City of Folsom Municipal Code........

4.0 PROJECT OBJECTIVES

5.0 REQUIRED APPROVALS

6.0 PREVIOUS RELEVANT ENVIRONMENTAL ANALYSIS

6.7 City of Folsom General Plan ..........

6.2 Tiering.............

6.3 lncorporation of the Folsom General Plan and East Area Facilities Plan ElRs by Reference.

6.4 Summary of Folsom 2035 General Plan EIR
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED .............

DETERMTNATTON (TO BE COMPLETED BY THE LEAD AGENCY)...............

ENVIRONMENTAL INITIAL STUDY CHECKLIST
r. AESTHETrCS.............

AGRICULTU RE AND FORESTRY RESOURCES ..,.......

Page
t
I
1 1
L
2 2
3 3
3 3
4 4
4 4
4 4
5 7
7 7
7 8
8 8

7.0 8.0

9.0 tt
t2
13 t4
III. AIR QUALITY
..........17
..........19
IV BIOLOGICAL RESOURCES. ..........30

Page 558 ends

05/10/2022 Item No.18.

V. CULTURAL RESOURCES.
vt. ENERGY................

VII. GEOLOGY AND SOILS
vill
lx.

X.

GREENHOUSE GAS EMISSIONS.....,.,....

HAZARDS AND HAZARDOUS MATERIALS......,..

HYDROLOGY AND WATER QUALITY
35 45
49 53
59 63
68 70
7L
77 78
80 XI. LAND USE AND PLANNING
Xll. MINERALRESOURCES..:.......

XIII. NOISE
XIV. POPULATION AND HOUSING.....

XV. PUBLICSERVICES......

XVI. RECREATION
XVII. TRANSPORTATION........

XVIII. TRIBAL CULTURAL RESOURCES....

XIX. UTILITIES AND SERVICE SYSTEMS
XX. WILDFIRE
XXI. MANDATORY FINDINGS OF SIGNIFICANCE...........

MITIGATION MONITORING AND REPORTING PROGRAM..

I NITIAL STUDY PREPARERS

REFERENCES
...81
...84
...88
...91
...92

10.0 11.0
t2.o
.....95
.....95
96

Page 559 ends

05/10/2022 Item No.18.

LIST OF TABLES
No. Title
Table 1. City of Folsom Municipal'Code Regulating Construction and Development...

Table 2, Sacramento County Attainment Status........,.

Table 3. SMAQMD Significance Thresholds...

Table 4. Operational Criteria Pollutant and Precursor Emissions..

Table 5. Maximum Exposed lndividual lncremental Cancer Risk and Hazard lndex Ta ble 5. Ca lifornia Electricity Sources 2OI9 .............

Table 7. Global Warming Potential and Atmospheric Lifetimes......""'.....' Table 8. GHG Reduction Strategy Consistency Checklist
Table 9. City of Folsom Municipal Code Sections Regulating the Effects on Hydrology and Water Qu a I ity from U rba n Deve1opment........................

Table 10. Noise Compatibility Standards...

Table 11. Exterior Noise Level Standards....
tIST OF APPENDICES
Figures
Folsom Lakeside Crematorium Project Air Quality and Greenhouse Gas Assessment and Addendum to the Folsom Lakeside Crematorium Project Air Quality and Greenhouse Gas Emissions Assessment
Tribal Consultation Record for Compliance with AB 52 and CEQA Mitigation Monitoring and Reporting Program
Page
6 ,.65
722
...74
A
B
c
D
ilt

Page 560 ends

05/10/2022 Item No.18.

Lakeside Memorial Lawn Crematorium
I.O INTRODUCTION
This lnitial Study (lS) addresses the proposed Lakeside Memorial Lawn Crematorium project (proposed project) and whether it may cause significant effects on the environment. The lS also assesses whether any environmental impacts of the project are susceptible to substantial reduction or avoidance by project revision, imposition of conditions, or any other means [515152(bX2)] of the California Environmental Quality Act (CEQA) Guidelines. lf such revisions, conditions, or other means are identified, they will be included as mitigation measures.

This lnitial Study relies on CEQA Guidelines Sections $15064 and 15064.4 in its determination of the significance of the environmental impacts. Per $15054, the finding as to whether a project may have one or more significant impacts shall be based on substantial evidence in the record, and that controversy alone, without substantial evidence of a significant impact, does not trigger the need for an Environmental lmpact Report (ElR).

2.O PROJECT BACKGROUND
The following project specific technical reports quantified analysis and or surveys were used in preparation of this lnitial Study and are incorporated by reference:

Air Quality and Greenhouse Gas Analysis, prepared by HELIX Environmental Planning, lnc. (December 2O2O).

Addendum to the Folsom Lakeside Crematorium Project Air Quality and Greenhouse Gas Emissions Assessment, prepared by HELIX Environmental Planning, lnc. (November2o2tl.

Cultural Resources lnventory Report for the Lakeside Memorial Lawn Storage Shed Project, prepared by ECORP Consulting, lnc. (November2O2O).

Tribal Consultation Record for Compliance with Assembly Bill 52 and CEQA for the Lakeside Memorial Lawn Storage Shed Project, prepared by ECORP Consulting, lnc. (January 2O2Il.

3.0 PROJECT DESCRIPTION

3.1 Projecl locolion
The proposed project would be constructed on an approximately 12-acre parcelsituated nearthe western boundary of the City of Folsom in Sacramento County, California. The project site is located west of the intersection of Forrest Street/Natoma Street along Folsom Boulevard within the existing Lakeside Memorial Lawn Cemetery. lt lies along the eastern shore of Lake Natoma. The crematorium would be constructed within an existing shed along the eastern boundary of the property, just west of the end of Mormon Street. The project site is identified as Assessor's Parcel Number (APN) 070-0260- 001. Refer to Figure 1 for the regional location and Figure 2f or an aerial view of the project site. All figures are included in Appendix A.

3.2 Projecl Setting qnd Surrounding lond Uses
The project site is currently a small cemetery, with associated landscaping, outbuildings, and access roads. Lands to the south and west contain woodland habitat typical of riparian communities in the Sierra Nevada foothills. Soils at the project site are comprised of dredge tailings and other fill material. a
a
a
a
T

Page 561 ends

05/10/2022 Item No.18.

Lakeside Memorial Lawn Crematorium
Tailing piles between the site and Folsom Boulevard prevent the site from being visible from that street.

To the west is also the Jedidiah Smith Memorial Trail that runs along the eastern shore of Lake Natoma.

The trail, also known as the American River Bike Trail, connects Folsom Lake (north of the project site) to the confluence of the American and Sacramento Rivers in Downtown Sacramento. lt is a part of the American River Parkway that is operated by the California Department of Parks and Recreation. To the north of the project site is a small residential neighborhood with single-family dwellings. Folsom Boulevard runs in a north/south line just east of the property. East of Folsom Boulevard is a large, developed area containing single-family homes, apartment complexes, a mobile home park, and some small businesses. The more regional setting is primarily characterized by residential development with a commercial shopping center to the east.

The project site is generally flat, ranging from about 175 to 185 feet above mean sea level. There are no wetlands, streams, or jurisdictional features located on the project site.

3.3 Project Chorqclerislics
The project would be located in an existing metal shed on the grounds of the existing Lakeside Memorial Lawn Cemetery. The shed can be reached by following Mormon Street to its terminus, making a slight left turn, and continuing for approximately 100 feet down an access road. The proposed project includes the installation of one HCT Apex-250 crematory manufactured by Hartwick Combustion. The shed would be modified to accommodate this device, but the shed's footprint would not be expanded. The shed currently covers 1-,071square feet. Further, a 10 foot by 15-foot walk-in coolerwould be installed inside the shed to provide temporary, short-term storage of human remains prior to cremation. Two 250- gallon propane tanks would be installed on a proposed concrete pad along the northern side of the shed to provide power for the crematorium, as no gas lines currently exist on the property. The pad would cover approximately 38.3 square feet of ground. A small exhaust stack would be installed on the roof of the shed.

The applicant anticipates 1-4 cremations on business days (Monday through Friday) with the total number of cremations not exceeding 500 per year. Average cremation time is approximately 90 minutes. Refer to Figure 3 for the site design plan in Appendix A.

Porking qnd Circulqlion
Diagonal parking spaces can be found along both sides of Mormon Street. At the terminus of Mormon Street, members of the public may continue straight onto a main cemetery access road to find an additional parking lot. All existing parking spaces would be maintained. Access to the project site directly would continue to be provided by a smaller existing access road located at the southwestern terminus of Mormon Street. Both the smaller access road and the main access road can be reached at the terminus of Mormon Street, but the two roads do not form a continuous loop due to a fence line dividing them. No new parking spaces or facilities would be constructed.

As the crematorium would not be located in or near a funeral home and would be separate from any funeral services or public gatherings provided by the project applicant, access would only need to accommodate a small number of staff members with business at the site' 2

Page 562 ends

05/10/2022 Item No.18.

Lakeside Memorial Lawn Crematorium
Emergency Vehicle Access
Emergency vehicle access would be maintained throughout the project site to meet the Fire Department standards for fire engine maneuvering, location of fire engine to fight a fire, rescue access to the units, and fire hose access to all sides of the building.

Utilities
The cemetery is currently serviced with potable water and irrigation water from the City of Folsom.

There is no need to seek a "will serve" letter as the City currently provides water and the crematory would not substantially increase flow demand. The City also provides solid waste collection and disposal services; the project is not expected to result in a significantly increased demand for solid waste removal.

As an existing facility, Lakeside Memorial Lawn maintains adequate fire response infrastructure for both current operations and the proposed project. The City Fire Department reviewed the project application and did not raise any concerns regarding the adequacy of water supply or site access.

The cemetery is currently served with an electricity supply from the Sacramento Municipal Utilities District (SMUD). Electrical connections already exist for the shed, and may be upgraded as needed as part of the proposed project. lnstallation and operation of the crematory would not result in a significant increase in demand for electricity on the project site.

The cemetery, including the shed, does not have an existing sewer line. This project would not require access to, or construction of, a sewer line. The two 25O-gallon propane tanks and a concrete pad for securing them would be constructed along the northern edge of the shed to provide power for the crematorium,
Stormwater flows on the site are retained and drained to Lake Natoma. There would be no change in the hydrologic regime of the project site due to the installation or operation of the proposed project. [ondscoping
Existing landscaping at the cemetery and around the shed consists of mature broad-leaved, coniferous, trees and palms. These trees and landscaping also provide shade for much of the cemetery and many of the parking spaces. An irrigated lawn surrounds the existing cemetery plots, and a smaller lawn surrounds the rear of the shed (i.e., the non-service entrance side). Native oak/gray pine woodland habitat surrounds the cemetery.

No new landscaping installation or modification is proposed. Native habitat in the vicinity of the project would not be disturbed. No built footprint would be expanded.

Fencing
An existing brick and wrought iron fence demarcate the boundary to the cemetery from the Forrest Street side, but does not extend the length of Mormon Street. A wooden fence currently separates the front side of the shed (facing the access road) from the back side and extends both north and south of the shed. The fencing south ofthe shed further extends to blockthe access road and restrict access between the lawn to the west of the shed and the access road to the east of the shed. 3

Page 563 ends

05/10/2022 Item No.18.

Lakeside Memorial Lawn Crematorium
Groding
No grading of the site would be required.

3.4 City Regulqlion of Urbon Developmenl
Generql Plqn
The City of Folsom updated and adopted its current comprehensive General Plan in August 2018. The General Plan is a long-term planning document that guides growth and land development in the City. lt provides the foundation for establishing community goals and supporting policies, and directs appropriate land uses for all land parcels within the City. The project site is designated as Open Space (OS) in the City of Folsom General Plan. lt is also within the Historic District and within a Sacramento Area Council of Governments (SACOG) Transit Priority Area.

Zoning Ordinonce
Developed land uses in the City of Folsom are regulated specifically by the City's Zoning Code (Title 17 of the City's Municipal Code), in addition to the other adopted regulations and programs that apply to all proposed development within the City. ln more detailthan the General Plan, the Zoning Code regulates land uses on a parcel-by-parcel basis throughout the City. ln order to achieve this regulation, the City assigns each parcel within the City to a zoning district, such as a district for single-family homes.

Regulations for each district apply equally to all properties within the district.

The project site is currently within the Open Space/Public Primary Area of the Historic District (OS/P), with an underlying zoning of Open Space and Conservation (OSC). The applicant is seeking a Conditional Use Permit from the City to authorize their installation of a crematory'

3.5 Olher City Regulqlion of Urbon Developmenl
The City of Folsom further regulates urban development through standard construction conditions and through mitigation, building, and construction requirements set forth in the Folsom Municipal Code.

Required of all projects constructed throughout the City, compliance with the requirements of the City's standard conditions and the provisions of the Municipal Code avoids or reduces many potential environmental effects. City procedures to minimize negative environmental effects and disruptions include an analysis of existingfeatures, responsible agency and public inputtothe design process, engineering and design standards, and construction controls. The activities that mitigate typical environmental impacts to be implemented by the City during the project review, design, and construction phases are described in greater detail below.

Community Development Deporlmenl Slqndqrd Conslruclion Condilions The City's standard construction requirements are set forth in the City of Folsom, Community Development Standard Construction Specifications updated in February of 2020. A summary of these requirements is set forth below and incorporated by reference into the project description. Copies of these documents may be reviewed at the City of Folsom, Community Development Department, 50 East Natoma Street, Folsom, California 95630.
4

Page 564 ends

05/10/2022 Item No.18.

Lakeside Memorial Lawn Crematorium
The Department's standard construction specifications are required to be adhered to by any contractor constructing a public or private project within the City. lJse of Pesticrdes - Requires contractors to store, use, and apply a wide range of chemicals consistent with all local, state, and federal rules and regulations.

Air Pollution Control- Requires compliance with all Sacramento Metropolitan Air Quality Management District (SMAaMD) and City air pollution regulations.

Woter Pollution - Requires compliance with City water pollution regulations, including National Pollutant Discharge Elimination System (NPDES) provisions.

Noise Control- Requires that allconstruction work comply with the Folsom Noise Ordinance (discussed further below), and that all construction vehicles be equipped with a muffler to control sound levels.

Naturally Occurring Asbestos - Requires compliance with all SMAQMD and City air pollution regulations, including preparation and implementation of an Asbestos Dust Mitigation Plan consistent with the requirements of Section 93105 of the State Government Code.

Weekend, Holiday, ond Night Work - Prohibits construction work during evening hours, or on Sunday or holidays, to reduce noise and other construction nuisance effects.

Public Convenience - Regulates traffic through the work area, operations of existing traffic signals, roadway cuts for pipelines and cable installation, effects to adjacent property owners, and notification of adjacent property owners and businesses.

Public Safety ond Troffic Control- Regulates signage and other traffic safety devices through work zones Existing Utilities - Regulates the relocation and protection of utilities Preservotion of Property- Requires preservation of trees and shrubbery and prohibits adverse effects to adjacent property and fixtures.

Cuttural Resources - Requires that contractors stop work upon the discovery of unknown cultural or historic resources, and that an archaeologist be retained to evaluatethe significance of the resource and to establish mitigation requirements, if necessary.

Protection of Existing Trees - Specifies measures necessary to protect both ornamental and native oak trees.

Cleoring ond Grubbing - Specifies protection standards for signs, mailboxes, underground structures, drainage facilities, sprinklers and lights, trees and shrubbery, and fencing. Also requires the preparation of a Stormwater Pollution Prevention Plan (SWPPP)to control erosion and siltation of receiving waters.

Reseeding - Specifies seed mixes and methods for reseeding of graded areas.

City of Folsom Municipol Code
The City regulates many aspects of construction and development through requirements and ordinances established in the Folsom Municipal Code. These requirements are summarized in Table 1 and 5

Page 565 ends

05/10/2022 Item No.18.

Lakeside Memorial Lawn Crematorium
incorporated by reference into the project description. Copies of these documents may be reviewed at the City of Folsom, Office of the City Clerk, 50 East Natoma Street, Folsom, California 95630.

Table 1. City of Folsom Municipal Code Regulating Construction and Development CODE

SECTION

EFFECT OF CODE

8.42 Establishes interior and exterior noise standards that may not be exceeded within structures, including residences;
establishes time periods for construction operations.

Establishes conditions and requirements for the discharge of urban pollutants and sediments to the storm-drainage
system; requires preparation and implementation of
Stormwater Pollution Prevention Plans.

9.34 Defines hazardous materials; requires filing of a Hazardous Material Disclosure Form by businesses that manufacture, use, or store such materials.

Establishes standards for the construction and monitoring of facilities used for the underground storage of hazardous substances and establishes a procedure for issuance of
permits for the use of these facilities.

Regulates the cutting or modification of trees, including oaks and specified other trees; requires a Tree Permit prior to cutting or modification; establishes mitigation requirements for cut or damaged trees.

Prohibits the wasteful use of water; establishes sustainable landscape requirements; defines water use restrictions.

Adopts the California Energy Code, 2010 Edition, published as Part 6, Title 24, C.C.R. to require energy efficiency standards for structures.

Adopts the California Green Building Standards Code
(CALGreen Code), 2010 Edition, excluding Appendix Chapters A4 and A5, published as Part 11, Title 24, C.C.R. to promote and require the use of building concepts having a reduced negative impact or positive environmental impact and
encouraging sustainable construction practices.

Requires a grading permit prior to the initiation of any grading, excavation, fill or dredging; establishes standards, conditions, and requirements for grading, erosion control, stormwater drainage, and revegetation.

Restricts or prohibits uses that cause water or erosion hazards, or that result in damaging increases in erosion or in flood heights; requires that uses vulnerable to floods be protected against flood damage; controls the modification of floodways; regulates activities that may increase flood damage or that could divert floodwaters.

8.70 9.35

12.16 t3.26

74.r9

14.20 t4.29

CODE NAME
Noise Control
Stormwater Management
and Discharge Control
Hazardous Materials
Disclosure
Underground Storage of
Hazardous Substances
Tree Preservation
Water Conservation
Energy Code
Green Building Standards
Code
Grading Code

14.32 Flood Damage Prevention
6

Page 566 ends
← All documents from this meeting