Cities Index.
Agenda

Hemet City Council
November 12, 2024

Document
Agenda
Meeting
November 12, 2024
Body
Hemet City Council
Pages
1,962
Original file
227.1 MB
Text extracted from the city's file for reading and search. Open the original on hemetca.civicweb.net. That file is the official record.

15.B

Page 1057 of 1962 ends

Oakland and Santa Fe Water Replacement
City of Hemet | On-Call Land Surveying Services 16
\ Approach
Topographic Mapping/
As-Built Surveys
The RICK team has many tools to accomplish
topographic surveys, including in-house
photogrammetric services, conventional methods
using Trimble GPS RTK, Trimble robotic total stations,
and Leica terrestrial laser scanning systems.

Our in-house photogrammetric mapping services
are performed using soft copy stereo workstations
with KLT Atlas software or Summit Professional.

These systems collect major terrain breaklines,
buildings, trees, roads, utility structures, and any
other visible improvements within project limits.

Once collected and field-verified, the data is
directly imported into MicroStation V-8 according
to the City’s CADD & Drafting Standards.

For conventional topographic surveys, our fieldto-finish method allows the field crew to create the main portion of the CADD line work file using
Hemet’s unique descriptor codes. The data is directly
imported into a MicroStation V-8 .dgn file per the
City’s CADD & Drafting Standards.

For both photogrammetric and conventional
topographical surveys, field review plots are
generated and field-walked to verify completeness
and accuracy by a licensed land surveyor as part of
the project’s quality assurance. The reviewed plot
changes are corrected in the file, and a presubmittal
meeting with Hemet is arranged to ensure codes and
levels are correct. Any corrections are made, and the
final map is submitted.

RICK also provides terrestrial 3-D laser scanning to
perform topographic surveys. This tool produces a
high-density point cloud of precise measurements
used to accurately prepare topographic maps of
roads, as-built project sites, model interiors or
exteriors of buildings, pipe networks, bridges, and
more. Laser scanning captures maximum field
information, allowing multiple design disciplines
to utilize data from a single survey mission while
ensuring workplace safety by keeping the survey
team out of hazardous conditions.

Construction Surveys
RICK has been providing construction surveying
for decades. Our experience includes staking
for all aspects of public works projects, as well
as land development tasks for both residential
and commercial projects. Additionally, we have
extensive experience staking facilities for longdistance utility improvements and managing stormwater facilities.

Our survey crews are highly trained in wellestablished procedures that ensure accurate and efficient staking, including the ability to field
audit plans for errors. Our crews can function
independently in the field, adapt to changing
priorities, and perform calculations to modify stake
locations as the needs of the project require.

Cut-sheets are printed electronically daily and
are either provided the next day or emailed to the
appropriate person that afternoon.

Page 294 of 471 ends

15.B

Page 1058 of 1962 ends

City of Hemet | On-Call Land Surveying Services 17
\ Approach
Survey Analysis
RICK Survey Analysts are trained and have
access to both MicroStation and AutoCAD Civil
3D software, as well as Word, Excel, and other
Microsoft Office tools. Each analyst has access
to RealQuest property information, DataTree
online map/deed information, and City and County
records. Our Computing and Mapping Division
personnel are experienced in analyzing field
data to prepare and process maps and other
documents for local agencies, with the versatility to
adapt to any agency’s standards.

During the course of a work order, there will be
open communication with the City of Hemet to
report the status as work progresses.

The final deliverable from RICK will consist of an
organized report containing a project summary, all
research records, field notes, site digital pictures,
hard copies of electronic data, and electronic files
in the necessary format. Additionally, RICK has the
technical software resources to provide or archive
the required reports.

Deliverables
During the task order process, there will be open
communication with Hemet to report the status as
work progresses. This communication will govern
the contents of the final deliverable, which typically
includes a project summary report, all research
records, field notes, hard copies of electronic data,
and the electronic files in the required format.

RICK will immediately document and notify the City
of any defects or hazardous conditions observed
in the vicinity of the project site before, during, or
after the construction work.

RICK will document and provide the results of
the work to the satisfaction of the City. This may
include preparation of field and final reports or
similar evidence of attainment.

East Menlo Improvements

Page 295 of 471 ends

15.B

Page 1059 of 1962 ends

City of Hemet | On-Call Land Surveying Services 18
\ Approach
Approach to On-Call Contracts
We understand that each client’s objectives are unique, and we prioritize close collaboration to address concerns and provide guidance tailored to achieving desired outcomes efficiently and within budget constraints.

With over three decades of experience in
Riverside County, RICK has held on-call contracts
with the County of Riverside across various
disciplines. Additionally, we have a long-standing
track record of delivering successful surveying
services to regional agencies and the City of
Hemet. This extensive experience has provided us
with a deep understanding of the objectives and
purpose behind as-needed services contracts.

RICK is well-prepared to coordinate and manage
multiple concurrent task orders through a
proven two-phase delivery method, ensuring
comprehensive and efficient project execution.

PLANNING & STAFFING PHASE 1
City of
Hemet
Identifies
Need
Project
Review
Team Assignment Communication/Understanding,
Project Goals
Scope & Fee
Agreement
Kickoff
Meeting
Develop
Workplan
Execute
Task Order
In the Planning and Staffing Phase, the RICK Team will:
• Initiate discussions with the City of Hemet to understand the task order goals and objectives, conduct a site visit for a thorough understanding of constraints, conditions, and the full scope of the task order. • Assign appropriate task managers, discipline leaders, and subconsultants with relevant experience and availability to respond according to the scope and schedule requirements.
• Present a comprehensive scope and fee proposal to the City, which will include a detailed schedule with submittal timelines. PHASE 2 Perform
Work
Monitor
Progress
Team Continuity,
Communication
Meeting Deliverables/Milestone
Schedules, Budget
Quality
Control Deliverables Complete
Task Orders
Field Walk
In the Performance Phase, the RICK Team will:
• Upon negotiation of the scope of work and fee and receipt of the notice to proceed, gather the necessary project data to initiate the task. • Throughout the task execution, maintain regular communication with City staff to update them on milestones and identify any emerging concerns.
• Continuously monitor the project schedule, ensuring adherence to key scope items, and adjust the schedule as needed after the completion of each task.
• Conduct routine meetings with the City of Hemet staff and other consultants to review project status, address potential issues, and present deliverables, including drafts and budget updates, as the project progresses towards completion. • Exercise control and management over any scope changes that may arise. • Implement thorough quality assurance and quality control reviews at each task order milestone to ensure the highest level of accuracy and compliance.

PERFORMANCE

Page 296 of 471 ends

15.B

Page 1060 of 1962 ends

City of Hemet | On-Call Land Surveying Services 19
\ Approach
Approach to Project Management
RICK has built a solid reputation for delivering quality projects on time and within budget.

Central to this success is our rigorous project management approach, which relies on the regular use of project control tools, procedures, and methods to guide planning, scheduling, scope and budget monitoring, document control, and cost estimating, while accommodating project variables or changes. Our disciplined management approach is structured around five key components:

Communication
and Coordination
Effective coordination and open
communication between Hemet’s
survey staff and the RICK Team are
essential for the contract’s success. We initiate
communication from the project onset, meeting
with Hemet to discuss project goals, tasks, and
deliverables, and collaboratively develop a project
timeline. Communication protocols and expectations
for collaboration and knowledge transfer are
established during the Project Kick-off Meeting.

Our efficient organizational structure and projectproven practices support successful schedule maintenance and budget control. RICK will allow
authorized federal, state, county, and city officials
access to the workplace, books, documents, papers,
fiscal records, payroll, materials, and other relevant
contract records pertinent to the projects that RICK is contracted to provide services on. All relevant records shall be retained for at least three years, or as the city requires.

Project Planning
and Scheduling
Detailed planning at the project’s
outset is crucial to reducing risk,
ensuring quality, and maintaining
schedule and budget adherence.

Upon receiving the Notice to Proceed, the RICK
Team will create a detailed schedule to organize
overall project tasks and budget, tracking actual
versus scheduled work and costs. Critical-path items,
manpower resources, and cost estimates will be
thoroughly documented and monitored.

Cost Controls
We prioritize our client’s financial
restrictions and endeavor to avoid
changes to the project budget.

Our dedication to this principle is
frequently acknowledged by our clients. We firmly
believe that establishing a well-defined project scope
in collaboration with our clients is the most effective way to control costs. By determining our clients’
needs and goals upfront and organizing the project
to achieve those specific objectives, we significantly
reduce changes as the project progresses.

We implement cost control measures by combining
both tracking and management activities, including:
• Weekly expenditure tracking, report compilation,
and report review by the PM using Deltek Vision
• Effective staff supervision
• Continuity of staff assignments
• Continual project communication
• Timely resolution of project issues
• Monthly detailed reports on expenditures versus
budget; completion progress versus plan, and
more

Page 297 of 471 ends

15.B

Page 1061 of 1962 ends

City of Hemet | On-Call Land Surveying Services 20
\ Approach
Quality Assurance/Quality Control
The RICK Quality Assurance
and Quality Control Program is
comprehensive, drawing from
proven practices and decades of
experience. With over six decades
of combined expertise, RICK has
earned a reputation for consistently delivering highquality work, evidenced by long-standing client relationships. Regardless of project size or scope,
we are dedicated to understanding our clients’
needs, meeting specified quality requirements and
standards, and exceeding client expectations.

RICK maintains a continuous emphasis on
quality control throughout all project phases. This
commitment is upheld through adherence to the
Company’s Manual on Quality Control Standards,
regular quality control seminars, peer reviews,
and ongoing staff performance evaluations. These
measures extend to project scheduling, internal
reviews, and documentation.

For each project, a comprehensive quality control
plan is developed, with assigned Project Managers
maintaining requisite checklists. Quality control
reviews are overseen by
our QA/QC Manager and
conducted by independent
Project Managers throughout
project development.

Additionally, Field Walks
by Project Managers
occur at each milestone,
ensuring adherence to
quality standards and client
specifications.

Continual
Improvement
For continuous enhancement,
the project team identifies best
practices and documents lessons
learned throughout the project
life cycle. This project data is shared across
RICK’s various disciplines and integrated into the
company’s institutional knowledge base. Thus, the
experience gained from one project can benefit
future projects and enhance the company’s
capabilities.

Scheduling Task Orders for the City of Hemet
Scheduling Task Orders for the City of Hemet involves the regular utilization of project control procedures and methods to facilitate planning, schedule monitoring, and adaptation to project variables or changes. These project controls are achieved through a combination of effective tracking tools and management activities. Here are examples of the activities and tools to be employed for this project:

Management Activities
• Effective staff supervision and communication,
ensuring clarity and accountability.
• Consistent staff assignments to maintain
continuity and efficiency.
• Regular client and team meetings to address
issues and maintain alignment.
• Prompt meeting minutes outlining action items
and assignments for clear follow-up.
• Efficient cross-management to facilitate
coordination and collaboration across teams.

Management Tools
• Establishment of a detailed project schedule
(Gantt Chart) at the project’s outset to outline
tasks and timelines.
• Tracking critical path items and forecasting
dates to ensure adherence to project
milestones.
• Monitoring progress of actual versus scheduled
work to gauge project advancement.
• Tracking resources to forecast needs and
ensure adequate project manpower/staffing.
• Monitoring cash flow to track actual
costs versus budgeted costs for financial
management.
• Developing and maintaining a comprehensive
project cost estimate to guide budget planning
and control.

Page 298 of 471 ends

15.B

Page 1062 of 1962 ends

City of Hemet | On-Call Land Surveying Services 21
\ Approach
Schedule
Adjacent is a typical
schedule for a designas-needed contract,
incorporating the anticipated
surveying services outlined in this RFP.

During the Preliminary Investigations
phase, which includes field surveying
and mapping, RICK will provide a
comprehensive schedule for all services.

Subsequently, during the Construction
Phase, survey services will involve
performing the necessary construction
staking for the infrastructure improvements.

Note: The RICK surveying division will
commit to preparing a proposal for
these services within 10 working days of
receipt of a Task Order request.

ID Task Name Duration Start Finish Predecessors
1 Sample Task Order Schedule - As-Needed Contracts 81 wks Mon 7/1/24 Fri 1/16/26 2 NTP 0 days Mon 7/1/24 Mon 7/1/24
3 Design Phase 33 wks Mon 7/1/24 Fri 2/14/25
4 Preliminary Investigations 8 wks Mon 7/1/24 Fri 8/23/24 5 Field Surveying and Right of Way Mapping 4 wks Mon 7/1/24 Fri 7/26/24 2 6 As-Built Research and Base Map Preparation 4 wks Mon 7/29/24 Fri 8/23/24 5 7 Geotechnical Investigations (If applicable) 4 wks Mon 7/29/24 Fri 8/23/24 5 8 Utility Potholing (If applicable) 4 wks Mon 7/29/24 Fri 8/23/24 5 9 Final Engineering 25 wks Mon 8/26/24 Fri 2/14/25
10 30% Submittal 9 wks Mon 8/26/24 Fri 10/25/24
11 30% PS&E Preparation 6 wks Mon 8/26/24 Fri 10/4/24 4 12 City Review - 30% Submittal 3 wks Mon 10/7/24 Fri 10/25/24 11 13 75% Submittal 9 wks Mon 10/28/24 Fri 12/27/24
14 75% PS&E Preparation 6 wks Mon 10/28/24 Fri 12/6/24 12 15 City Review - 75% Submittal 3 wks Mon 12/9/24 Fri 12/27/24 14 16 100% Submittal 7 wks Mon 12/30/24 Fri 2/14/25
17 100% PS&E Preparation 4 wks Mon 12/30/24 Fri 1/24/25 15 18 City Review- 100% Submittal 3 wks Mon 1/27/25 Fri 2/14/25 17 19 Bid/Award 12 wks Mon 2/17/25 Fri 5/9/25
20 Advertise/Bid 6 wks Mon 2/17/25 Fri 3/28/25 18
21 Award 6 wks Mon 3/31/25 Fri 5/9/25 20
22 Construction Phase 26 wks Mon 5/12/25 Fri 11/7/25
24 Post Construction/As-Builts Phase 10 wks Mon 11/10/25 Fri 1/16/26 25 Punchlist Work by Contractor 4 wks Mon 11/10/25 Fri 12/5/25 23 26 As-builts 6 wks Mon 12/8/25 Fri 1/16/26
7/1

J J A S O N D J F M A M J J A S O N D J F M A M J J A S Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Pr
Sample Task Order Schedule -
As-Needed Surveying

Page 1 ends

Project: As-Needed Surveying
Date: Mon 4/29/24
ID Task Name Duration Start Finish Predecessors
1 Sample Task Order Schedule - As-Needed Contracts 81 wks Mon 7/1/24 Fri 1/16/26 2 NTP 0 days Mon 7/1/24 Mon 7/1/24
3 Design Phase 33 wks Mon 7/1/24 Fri 2/14/25
4 Preliminary Investigations 8 wks Mon 7/1/24 Fri 8/23/24 5 Field Surveying and Right of Way Mapping 4 wks Mon 7/1/24 Fri 7/26/24 2 6 As-Built Research and Base Map Preparation 4 wks Mon 7/29/24 Fri 8/23/24 5 7 Geotechnical Investigations (If applicable) 4 wks Mon 7/29/24 Fri 8/23/24 5 8 Utility Potholing (If applicable) 4 wks Mon 7/29/24 Fri 8/23/24 5 9 Final Engineering 25 wks Mon 8/26/24 Fri 2/14/25
10 30% Submittal 9 wks Mon 8/26/24 Fri 10/25/24
11 30% PS&E Preparation 6 wks Mon 8/26/24 Fri 10/4/24 4 12 City Review - 30% Submittal 3 wks Mon 10/7/24 Fri 10/25/24 11 13 75% Submittal 9 wks Mon 10/28/24 Fri 12/27/24
14 75% PS&E Preparation 6 wks Mon 10/28/24 Fri 12/6/24 12 15 City Review - 75% Submittal 3 wks Mon 12/9/24 Fri 12/27/24 14 16 100% Submittal 7 wks Mon 12/30/24 Fri 2/14/25
17 100% PS&E Preparation 4 wks Mon 12/30/24 Fri 1/24/25 15 18 City Review- 100% Submittal 3 wks Mon 1/27/25 Fri 2/14/25 17 19 Bid/Award 12 wks Mon 2/17/25 Fri 5/9/25
20 Advertise/Bid 6 wks Mon 2/17/25 Fri 3/28/25 18
21 Award 6 wks Mon 3/31/25 Fri 5/9/25 20
22 Construction Phase 26 wks Mon 5/12/25 Fri 11/7/25
24 Post Construction/As-Builts Phase 10 wks Mon 11/10/25 Fri 1/16/26 25 Punchlist Work by Contractor 4 wks Mon 11/10/25 Fri 12/5/25 23 26 As-builts 6 wks Mon 12/8/25 Fri 1/16/26
7/1
J J
Half 2
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Samp
A
Project: As-Needed Surveying
Date: Mon 4/29/24
Well 16 Improvements

Page 299 of 471 ends

15.B

Page 1063 of 1962 ends

SECTION II
Key Personnel

Page 300 of 471 ends

15.B

Page 1064 of 1962 ends

Proposed Staff/Team
City of Hemet | On-Call Land Surveying Services 23
\ Key Personnel
Organizational Chart
A well-organized team with a clear division of
responsibilities is essential for the successful
delivery of any project. The organizational chart
presented here delineates the project tasks each
key team member will be responsible for and the
reporting/communication structure within the team.

Our Project Manager, Scott Boydston, PLS, will
have full responsibility for meeting this project’s
requirements on time and within budget.

Kevin Gibson, PE, is Principal-in-Charge and
provides signatory authority to the team. Serving
as the Primary Contact, Matthew Reiner,
LSIT, oversees the field crews and day-today responsibilities for the survey department.

Additionally, Wayne Crawford will be responsible
for Photogrammetry and Aerial Mapping services.

All personnel are fully committed to the needs of
this project and will not be removed or replaced
without written approval from the City.

PRINCIPAL-IN-CHARGE
Kevin Gibson PE *

PROJECT MANAGER
Scott Boydston PLS *
ADMIN MANAGERSURVEY & MAPPING DEPT
Kathy Barosko *

QA/QC MANAGER
Richard O’Neill PE, LEED AP, QSD *
* Key personnel resumes are included in the Appendix.

Additional resumes available upon request

SURVEY ANALYST
Christian Atadero LSIT, EIT *

FIELD SUPERVISOR
& MAIN POINT-OF-CONTACT
Matthew Reiner, LSIT *

FIELD SURVEY
Frank Rohal *
Michael Schmidt *

BACKUP PERSONNEL
Ruben Hernandez
Garrett Nelson
BACKUP: Jim Wilson
BACKUP: Tim Gabrielson PE
BACKUP: Dennis Armstrong PLS
BACKUP: Geff Dye PLS
BACKUP: Amanda Nelson
BACKUP: Ramiro Hernandez
BACKUP: Melissa Peace PLS

PHOTOGRAMMETRY &

AERIAL MAPPING
Wayne Crawford *

PRINCIPAL

SURVEY ANALYST
Darla Clauson *
All personnel are RICK employees
unless otherwise noted.

Page 301 of 471 ends

15.B

Page 1065 of 1962 ends

\ Key Personnel
City of Hemet | On-Call Land Surveying Services 24
Kevin Gibson PE
Principal-in-Charge
Kevin Gibson manages RICK’s Public Works Division. With over three decades of experience in the San Diego region, Kevin has specialized in the design of public works infrastructure and pipeline projects. His responsibilities include QA/QC program implementation, contract management, civil engineering design oversight, and project team management. Kevin has designed and delivered a variety of public works projects for local agencies through both traditional and alternative delivery methods and is familiar with local and regional agency standards.

PROJECT EXPERIENCE
City of San Diego, As-Needed Civil Engineering Services, San Diego, CA: Principal-in-Charge for multiple task orders for the City’s Engineering & Capital Projects Department, that included providing engineering design, project management, bid and construction support services. These task orders were varied in both size and discipline with RICK providing roadway, grading, storm drain, water quality, sewer, traffic, ADA, and landscape design services in addition to hydrologic and hydraulic analyses for storm drains, green infrastructure design and storm water quality compliance.

City of Banning On-Call Engineering Services, Banning, CA: Kevin served as QA/QC Manager for this project that consists of preparing a design for approximately 7,200 LF of a new potable ductile iron pipe system.

San Diego Unified Port District, As-Needed Civil Engineering Services, San Diego, CA: Principal-in-Charge for this as-needed civil engineering contract providing a variety of civil engineering and consulting services.

These services included preliminary design services for the Chula Vista Bayfront project, this work required coordination with a number of District Departments, in addition to the City of Chula Vista, Caltrans, Sweetwater Authority, and SDG&E.

City of San Diego, University Avenue Mobility Project, San Diego, CA:

Principal-in-Charge of the as-needed task orders for plans and specifications or mobility improvements along University Avenue, within the North Park community. The objectives are to improve mobility for pedestrians and transit users; improve pedestrian safety at numerous street crossings; and reduce traffic.

EXPERIENCE
34 Years

EDUCATION
MBA, Civil Engineering
San Diego State University
BS, Civil Engineering,
University of Wisconsin

REGISTRATION
Professional Engineer in CA
(PE), No. 52295

PROFESSIONAL

AFFILIATIONS
Member, American Society of
Civil Engineers (ASCE)
Chapter Delegate, American
Public Works Association
(APWA)

Page 302 of 471 ends

15.B

Page 1066 of 1962 ends

\ Key Personnel
City of Hemet | On-Call Land Surveying Services 25
Richard O’Neill PE, LEED AP, QSD
QA/QC Manager
Richard O’Neill is responsible for the management of the RICK Riverside office, plan preparation, quality control, coordination of projects with clients, as well as supervision of all work performed by his team consisting of project engineers, designers, landscape architects, mapping analysts, and surveyors. He is highly experienced in all aspects of civil engineering related to site development and public infrastructure improvements.

Richard’s 24 years of experience include the design of roads, drainage systems, sewer systems, water systems, precise grading, and site improvements, which gives him the experience needed to ensure that quality assurance and quality control (QA/QC) procedures for RICK and the City of Moreno Valley are adhered to so projects are designed and constructed successfully.

PROJECT EXPERIENCE
City of Banning On-Call Engineering Services, Banning, CA: Richard is the Principal-in-Charge for this project that consists of preparing a design for approximately 7,200 LF of a new potable ductile iron pipe system. The water plans are being broken into 3 phases for construction purposes.

Plans coordinate the connection of existing service for existing businesses and residences affected by the abandonment of the old line. Right of way determination, utility research, potholing, existing topography, proposed easements, and traffic control are also included with the project.

Sommers Bend (Roripaugh Ranch), City of Temecula, CA: Richard is currently serving as Responsible Charge for a master planned community consisting of single family and multi-family residential components, a sports park, 2 recreation centers, an equestrian park and ride, 2 school sites, and two drainage channels. RICK was responsible for the specific plan amendment, financial tentative map, tentative map, and final engineering phases of the project Preliminary and final hydrologic/hydraulic studies and water quality management plans were needed for the project. Final engineering included rough grading, precise grading for the park and recreation centers, storm drain plans, and sewer and water plans. Analyses of the two channels were needed for proper velocity control and side slope protection Urban Housing Community, Veteran’s Village of Cathedral City, Palm Desert, CA: Richard is Principal-in-Charge for this affordable multi-family apartment housing complex for Veteran’s in Cathedral City. The infill development project includes approximately 60 units and a community center. RICK’s design efforts resolved a lack of off-site drainage infrastructure by designing the site and basin to be independent of offsite drainage. RICK’s scope of work for Veteran’s Village includes; research, site topography, ALTA survey / ALTA as-built, Record of Survey, General Plan Amendment and zone Change, Conditional Use Permit, sewer and water plans, storm drain plans, precise grading plans, bond estimates, utility easements, preliminary / final hydrologic and hydraulic studies, SWPPP, preliminary / final WQMP’s, construction administration, as-built plans, Street Plan revisions, parcel merger and landscape plans.

EXPERIENCE
24 Years

EDUCATION
BS, Civil Engineering,
California Polytechnic State
University, San Luis Obispo

REGISTRATION
Professional Engineer (PE) in
CA, No. 63285
LEED Accredited Professional
USGBC
Qualified SWPPP Designer

PROFESSIONAL

AFFILIATIONS
American Council of
Engineering Companies
(ACEC) Chapter
- Past-President of Local
Chapter
- State Director
Building Industry Association
(BIA) Riverside
American Public Works
Association (APWA) –
Riverside/San Bernardino
Branch
American Society of Civil
Engineers (ASCE)

Page 303 of 471 ends

15.B

Page 1067 of 1962 ends

\ Key Personnel
City of Hemet | On-Call Land Surveying Services 26
Scott Boydston PLS
Project Manager
Scott serves as the Mapping Director at RICK’s Riverside office. In his role, he oversees staff involved in the reduction of field data, boundary surveys, and right-of-way analysis for a diverse range of mapping projects. Scott’s responsibilities extend to directing office duties, including the layout and supervision of staff in the preparation of legal descriptions, plats, tract maps, parcel maps, records of survey, and ALTA surveys.

With extensive experience as Mapping Director, Scott possesses a deep understanding of performing and guiding staff in research and the processing of all of RICK’s projects in the Inland Empire region. His leadership and expertise play a crucial role in ensuring the accuracy and efficiency of mapping projects undertaken by RICK’s Riverside office.

PROJECT EXPERIENCE
City of Moreno Valley On-Call Services, Moreno Valley, CA: Scott serves as Mapping Director, overseeing mapping services for numerous projects within the City of Moreno Valley. His responsibilities included supervising and coordinating boundary and control surveys, preparing legal descriptions and plat maps to facilitate public right-of-way dedications, and preparing corner records for the replacement of survey monuments damaged during construction. Additionally, Scott was instrumental in the preparation, processing, and recordation of Record of Surveys, ensuring compliance with regulatory standards and project requirements. His expertise and leadership played a vital role in the successful execution of mapping projects, contributing to the development and maintenance of infrastructure within the City.

Metropolitan Water District, On-Call Land Surveying and Mapping Services, Various Cities, CA: Scott serves as Mapping Director overseeing boundary and topographic surveys across Southern California under task orders awarded to RICK. The scope of his responsibilities included conducting title searches, Federal field note research, County map research, and site reconnaissance. He supervised control surveys, GPS surveys, and aerial mapping, ensuring accurate survey analysis. Scott played a key role in preparing Records of Survey and disclosures of encroachments. He also oversaw the installation of final monumentation to document Metropolitan Water District (MWD) permanent easements throughout MWD’s distribution system area, spanning several Counties.

California Baptist University On-Call Services, Riverside, CA: As the Mapping Director, Scott oversees on-call mapping services for various projects at CBU’s 75-acre property in Riverside, CA. His responsibilities encompass a diverse range of tasks, including the preparation of specific plan legal descriptions, lot line adjustments, and construction staking for campus buildings and site improvements. Additionally, Scott coordinates campus and neighboring property aerial topographic surveys, providing valuable data for planning and development.

EXPERIENCE
22 Years

EDUCATION
San Jacinto Community
College Survey Classes

REGISTRATION
Professional Licensed
Surveyor in CA (PLS), No.
8835

Page 304 of 471 ends

15.B

Page 1068 of 1962 ends

\ Key Personnel
City of Hemet | On-Call Land Surveying Services 27
Matthew Reiner LSIT
Field Survey Manager, Main Point-of-Contact
Matthew Reiner is the Survey Field Manager at RICK’s Riverside office, where he leads the coordination and scheduling of survey crews for daily operations. With extensive expertise across various surveying and mapping domains, including residential, commercial, and public works projects, Matthew ensures adherence to industry standards and project specifications. In addition to overseeing project execution from start to finish, Matthew maintains rigorous quality control measures both in the field and office settings. He collaborates closely with job site superintendents and Public Agencies, fostering effective communication and compliance with regulatory requirements. Matthew’s responsibilities encompass contract administration, final task order report submission, project management, and data preparation for engineering and mapping departments. His proficiency in researching legal descriptions, tract maps, records of survey, GPS reduction, and boundary work underscores his comprehensive skill set in the surveying field.

PROJECT EXPERIENCE
City of Banning On-Call Services, Banning, CA: Matthew’s role as Project Manager is instrumental in leading the coordination efforts for mapping services, topographic survey, and construction staking. His primary responsibilities revolve around supervising survey crews, ensuring data accuracy, and organizing meetings with City officials to uphold compliance with regulatory standards.

City of Moreno Valley On-Call Services, Moreno Valley, CA: Matthew serves as Project Manager for mapping, topographic surveying, and construction staking projects spanning over 15 years with the City of Moreno Valley. In this capacity, he directed field crews, met with City personnel, coordinated schedules, and ensured the timely distribution of field data to the City. Matthew also managed the preparation of corner records for replacement survey monuments and maintained adherence to proper procedures in both field and office settings. Additionally, he oversaw contract administration and submitted final task order reports, contributing to the successful completion of key infrastructure projects for the City of Moreno Valley.

Metropolitan Water District, On-Call Land Surveying and Mapping Services , Various Cities, CA: as Project Manager Matthew coordinates all boundary and topographic surveys across Southern California task orders awarded to RICK. His responsibilities included overseeing site reconnaissance, control surveys, GPS surveys, and the installation of final monumentation. These efforts documented MWD permanent easements throughout the distribution system area spanning multiple counties.

Matthew’s leadership ensured the accurate and efficient completion of crucial surveying tasks, contributing to the comprehensive documentation of infrastructure within MWD’s distribution network.

EXPERIENCE
24 Years

EDUCATION
AS, Surveying Engineering,
Fullerton College
GPS Certified (UCR)
Hazardous Materials Training
10-hour OSHA Training
20-hour OSHA Training
40-hour OSHA Training
NSPS CST Level I Certified

REGISTRATION
Currently pursuing a California
Land Surveyor License

PROFESSIONAL

AFFILIATIONS
CLSA - California Land Survey
Association

Page 305 of 471 ends

15.B

Page 1069 of 1962 ends

\ Key Personnel
City of Hemet | On-Call Land Surveying Services 28
Wayne Crawford
Photogrammetry & Aerial Mapping
Wayne is a Principal Photogrammetry Technician with 37 years of experience. He is responsible for all phases of mapping projects, including aero triangulation, photogrammetric compilation, orthophotography, planimetric and contour digitizing and final map editing.

PROJECT EXPERIENCE
Lake Skinner Aerial Control and Topographic Mapping, Temecula, CA: Wayne and the team conducted premarking and GPS surveying for a 600-acre treatment plant site. 47 control points tied 64 photographs to the ground coordinate system. Aerotriangulation extended the control into the photographs. Terrain configuration was captured with photogrammetric breaklines and spot elevations. One-foot contours were generated and displayed on 25 map sheets. Planimetric features were captured using softcopy stereoplotters. An orthophoto mosaic was created for the entire lake region, including the mapping area and off-site acres.

City of San Diego As-Needed Land Surveying Services, San Diego, CA:

Wayne managed the photogrammetric tasks for our as-needed surveying services contract.

City of San Diego On-Call Land Surveying/Mapping Services, San Diego, CA: Wayne prepared scale models of the north and south portals, provided 3D Intergraph format topographic mapping, terrain data and InRoads DTMs (.ttn) files, photo index maps, contact prints, and orthophotos.

City of San Diego On-Call Topographic Mapping Services, San Diego, CA: Wayne has been a part of the team performing on-call topographic mapping services to the City of San Diego on a contract that dates back more than 20 years. These services have included photography, topographic mapping, volume calculations, and high quality digital orthophotos.

County of San Diego, Borrego Flood Area Lidar Mapping and Orthophotography, Borrego Springs, CA: Wayne performed compilation to support fifty-five square miles of LiDAR mapping as part of a FEMA flood area study.

San Diego Pipeline #6, San Diego County, CA: Wayne led the production of 1” = 100’ scale with a two-foot contour interval and 1” = 40’ with onefoot contours for the Metropolitan Water District of Southern California.

Deliverables included 3D Intergraph format topographic mapping, terrain data, InRoads DTMs (.ttn) files in Metropolitan format, photo index maps, contact prints, and orthophotos.

EXPERIENCE
37 Years

EDUCATION
BA, Accounting,
Ashford University

Page 306 of 471 ends

15.B

Page 1070 of 1962 ends

City of Hemet | On-Call Land Surveying Services 29
\ Key Personnel
Frank Rohal NSPS CST LEVEL 1
Field Survey
Frank is a Field Surveyor (Party Chief) based in RICK’s Riverside office.

He is experienced in performing boundary surveys, topographic surveys, survey control, aerial mapping control, ALTA surveys, 3D laser scanning as well as construction staking for private and public sectors.

Representative Projects Include:

City of Moreno Valley On-Call Services, Moreno Valley, CA: Frank served as a Party Chief on various projects throughout the City of Moreno Valley which have included construction staking, monument preservation and replacement when necessary, as well as topographic surveys.

California Baptist University On-Call Services, Riverside, CA: Frank served as a Party Chief where he worked on various projects at CBU’s 75-acre property in the City of Riverside. Projects have included a 700+ parking space parking lot, 500-bed student housing and 632 space parking structure, 95,000 s.f. University Center, 48,000 s.f. Music Building, Baseball and Softball Athletics complex modernization, construction staking for various student housing upgrades, campus buildings and site improvements, campus and neighboring property aerial topographic surveys, due diligence services, ALTA surveys for property acquisitions and infrastructure improvements for the entire property and an 8.4-acre ft. detention basin.

Kaiser Permanente 3-D Scanning, Various Locations, CA: Frank served as Party Chief for services provided to various Kaiser sites including Baldwin Hills, Baldwin Park, Bellflower, Riverside and Woodland Hills. Project tasks have included 3D site/ field scanning, precision as-built and BIM modeling, site survey, construction staking, topographic survey, and boundary survey.

Michael Schmidt
Field Survey
Michael is an Assistant Field Surveyor based in RICK’s Riverside office.

Michael is experienced in assisting the party chief performing boundary surveys, topographic surveys, survey control, aerial mapping control, ALTA surveys, as well as construction staking for private and public sectors.

Representative Projects Include:

City of Moreno Valley On-Call Services, Moreno Valley, CA: Michael served as a Survey Assistant on various projects throughout the City of Moreno Valley which have included construction staking, monument preservation and replacement when necessary, as well as topographic surveys.

California Baptist University On-Call Services, Riverside, CA: Michael served as a Survey Assistant where he worked on various projects at CBU’s 75-acre property in the City of Riverside. Projects have included a 700+ parking space parking lot, 500-bed student housing and 632 space parking structure, 95,000 s.f. University Center, 48,000 s.f. Music Building, Baseball and Softball Athletics complex modernization, construction staking for various student housing upgrades, campus buildings and site improvements, campus and neighboring property aerial topographic surveys, due diligence services, ALTA surveys for property acquisitions and infrastructure improvements for the entire property and an 8.4-acre ft. detention basin.

EXPERIENCE
10 Years

EDUCATION
A.S. Survey, Santiago Canyon
College

CERTIFICATES AND

LICENSES
NSPS CST Level 1

EXPERIENCE
3 Years

Page 307 of 471 ends

15.B

Page 1071 of 1962 ends

City of Hemet | On-Call Land Surveying Services 30
\ Key Personnel

EXPERIENCE
37 Years

EDUCATION
Survey Courses, Riverside
Community College
Survey Courses, San
Bernardino Community
College
University of California,
Riverside
Darla Clauson
Principal Survey Analyst
Darla is an Associate Survey Analyst at RICK’s Riverside office. She works primarily with the Mapping and Computing Division in preparing tract maps, records of survey, ALTA Surveys. As a support for various projects, she has prepared Legal Descriptions and Plat for Easements, Rights of Ways, Parcel Exchanges, Parcel Mergers, Lot Line Adjustments and Annexations. She has repeatedly won RICK’s quarterly CADD award for mapping products.

Representative Projects Include:

Metropolitan Water District, On-Call Land Surveying and Mapping Services , Various Cities, CA: CADD Operator / Supervisor for 11 of the 35 task orders awarded to REC. Scope included title search, federal field note research, county map research, site reconnaissance, control surveys, GPS surveys, aerial mapping, survey analysis, records of survey, encroachments disclosure, and installation of final monumentation to document MWD permanent easements throughout MWD’s distribution system area covering several counties. These permanent easement documents were prepared to the positional standards of the 2005 National Accuracy Standards for ALTAACSM Land Title Surveys.

California Baptist University On-Call Services, Riverside, CA: CADD Operator / Supervisor for on-call services provided for various projects at CBU’s 75-acre property in Riverside, CA. Projects have included: specific plan legal descriptions, lot line adjustments, construction staking for various campus buildings and site improvements, campus and neighboring property aerial topographic surveys, due diligence services, and ALTA surveys for property acquisitions.

On-Call Services, Moreno Valley, CA: CADD Technician/Supervisor for various projects, including preparation of legal descriptions and plat maps to facilitate public right of way dedications, prepare corner records for the replacement of survey monuments destroyed during construction as well as prepare ad process Record of Surveys for recordation.

Jurupa Valley Spectrum, Riverside County, CA: CADD Operator for pre-demolition ALTA survey located in the County of Riverside. Project tasks included field coordination, grading and construction of a 16-acre commercial site, which included a multiplex theater, restaurants, and retail and office space.

Rancho Bella Vista, Riverside County, CA: CADD Supervisor for an 800- acre boundary survey with aerial mapping located within unincorporated territory of Riverside County. Project tasks involved numerous legal descriptions, environmental acquisitions, street vacations, realignment dedications, and 5000’ of off-site acquisitions mapping and construction.

Norco Network, Norco, CA: CADD Operator for the development of a commercial site, in the City of Norco, CA. Tasks included Phases I and 2, which are now complete, offsite street dedication, and construction of Horseless Carriage Road.

University Village, Riverside, CA: CADD Supervisor for preparation of ALTA survey and various legal descriptions, plats, and legals.

Page 308 of 471 ends

15.B

Page 1072 of 1962 ends

City of Hemet | On-Call Land Surveying Services 31
\ Key Personnel
Kathy Barosko
Admin Manager, Survey & Mapping
Kathy Barosko is an Administrative Manager at RICK’s Riverside office.

Throughout her 24 years at RICK she has been responsible for a multitude of administrative duties supporting the Riverside office staff. She is responsible for contracts management, billing, establishing, and setting up new project requirements, as well as numerous other administrative tasks.

EXPERIENCE
35 years
Christian Atadero
LSIT, EIT, NSPS CST LEVEL 1
Survey Analyst
Christian graduated from California Baptist University in 2022 with a Bachelor of Science in Civil Engineering. In the last five years he has worked as an intern, Chainman, Researcher, Surveyor Assistant, and Mapping Analyst, all at RICK. During his time at RICK, he has learned AutoCAD, MicroStation, and Bluebeam. Working with a variety of people in all three departments: mapping, engineering, and survey has taught him teamwork and leadership skills.

Representative Projects Include:

On-Call Services, Moreno Valley, CA: Christian served as an assistant surveyor for monument restoration and setting of street monuments and centerline ties throughout the City of Moreno Valley.

Kaiser Permanente, Ontario, CA: Christian served as an assistant surveyor where he assisted in establishing control and running a closed traverse on the fourth story to capture column locations for real building grid lines.

Pad K Future Hotel Site, Riverside, CA: Christian served as an assistant surveyor where he assisted in the shoring monitor of piles for the excavation center.

EXPERIENCE
5 years

EDUCATION
BS, Civil Engineering,
California Baptist University

CERTIFICATES AND

LICENSES
LSIT - 2024
EIT - 2023
NSPS CST Level 1

Page 309 of 471 ends

15.B

Page 1073 of 1962 ends

SECTION III
Fee Schedule
Provided under separate cover

Page 310 of 471 ends

15.B

Page 1074 of 1962 ends

Forms

Page 311 of 471 ends

15.B

Page 1075 of 1962 ends

City of Hemet | On-Call Land Surveying Services 34
\ Forms
ATTACHMENT “A”

LEVINE ACT DISCLOSURE STATEMENT
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits City Officers from participating in any action concerning a license, permit, other entitlement for use, franchise, or contract (collectively “license, permit, or contract”) if they receive political contribution(s) from a party, or its agent(s), totaling more than $250 within the twelve (12) months before the proceeding, while a proceeding is pending, and for twelve (12) months following the date of a final decision in a proceeding. City Officers include City elected or appointed officers, their alternates, and any candidate for elective office.

Parties and their Agents are responsible for reviewing and disclosing their applicable contributions to City Officers on the record of a proceeding.

As a party to a proceeding, you are also required to provide information below about contributions made by you, your agents on behalf of you or your organization, your organization subject to the proceeding with the City, and any organization you direct or control pursuant to the aggregation rules at FPPC Reg. § 18438.5, except for uncompensated officers of a nonprofit organization. This form is to be submitted to the City and is a public record. If you have any questions about this form, please contact your City representative for assistance.

1. Have you or your organization, or any agent on behalf of you or your organization, or any organization you direct or control made any political contributions of more than $250 to any City Officer in the 12 months preceding the date of the submission of your proposals or the anticipated date of any City Council, Board, or Commission action related to this license, permit, or contract?
YES NO
If yes, please complete the table on the following page. If needed, please continue on additional pages.

Officer Name Payee Name Payment Date Payment Amount

Page 312 of 471 ends

15.B

Page 1076 of 1962 ends

City of Hemet | On-Call Land Surveying Services 35
\ Forms

2. Do you or your organization, or any agency on behalf of you or your organization, anticipate or plan to make any political contribution of more than $250 to any City Officer in the 12 months following any City Council, Board, or Commission action related to this license, permit, or contract? YES NO
If yes, please identify the City Officer(s):

Officer Name Payee Name Payment Date Payment Amount
Answering yes to either of the two questions above does not preclude the City from awarding a license, permit, or contract to your organization or any taking any subsequent action related to the said license, permit, or contract. It does, however, preclude the identified City Officers from participating in any actions related to this license, permit, or contract.
______________________________________________________________________ (Date) (Printed Name/Title of Authorized Representative) (Name of business/legal entity) ___________________________________
(Signature)
You must submit a supplemental form if you make any new reportable contribution(s) while the contract, license, permit, or other entitlement is being considered.

October 7, 2024 Kevin Gibson, PE, Principal RICK Engineering Company

Page 313 of 471 ends

15.B

Page 1077 of 1962 ends

CITY OF HEMET

ON-CALL LAND SURVEYING

SERVICES
PREPARED BY:

RTM Engineering Consultants, LLC
Amir Fallahi, P.E.
357 N. Sheridan Street, Suite 117
Corona, CA 92878
P: 951.279.1800
E: [email protected]
rtmec.com

CALIFORNIA

COLORADO

FLORIDA
IDAHO

ILLINOIS

INDIANA
IOWA
KANSAS

MARYLAND

MISSOURI

NEW MEXICO
TEXAS

WASHINGTON

WISCONSIN

Page 314 of 471 ends

15.B

Page 1078 of 1962 ends

PAGE 2

TABLE OF CONTENTS
SECTION I EXPERIENCE 5

FIRM OVERVIEW

LAND SURVEYING SERVICES

PROJECT EXPERIENCE & REFERENCES

PROJECT APPROACH
SECTION II PERSONNEL 11
SECTION III FEE SCHEDULE 17

Page 315 of 471 ends

15.B

Page 1079 of 1962 ends

PAGE 3
National Resources, Local Relationships
California | Colorado | Florida | Idaho | Illinois | Indiana | Iowa Kansas | Maryland | Missouri | New Mexico | Texas | Washington | Wisconsin

rtmec.com
October 7, 2024
Jilleen Ferris, P.E.

Deputy Public Works Director/Assistant City Engineer
City of Hemet
445 E. Florida Avenue
Hemet, CA 92543
RE: RFP for On-Call Land Surveying Services
Dear Jilleen,
RTM Engineering Consultants, LLC (RTM) is pleased to submit our response to provide On-Call Land Surveying Services to the City of Hemet in Riverside, California. This Statement of Qualifications has been prepared based on the RFP issued on September 9, 2024.

Founded in 1981, RTM Engineering Consultants, LLC is a national, multi-disciplinary engineering consulting firm that is well equipped and highly qualified to serve as engineers, designers, project managers, and expert consultants for your project needs. We have assembled a team of talented and experienced professionals ready and able to bring creativity, enthusiasm, and accountability to the project.

RTM’s Corona office is located approximately 45 miles from the City of Hemet. We believe that our proximity to the City and our knowledge of the City’s standards and policies will allow our team to provide responsive attention throughout the term of the contract. Over the past several years, RTM has been selected to provide on-call civil design services and surveying services for the Cities of Corona, Ontario, Yorba Linda, and Pomona as well as Eastern Municipal Water District, and the Riverside County’s Transportation Department, and Flood Control and Water Conservation District.

We have reviewed and understand the needs of the City for various upcoming construction projects. RTM accepts the City of Hemet Professional Services Agreement as currently written, and with no exceptions.

Thank you for the opportunity to submit our qualifications. Should you have any questions, please do not hesitate to contact me at 951.279.1800.

Best regards,
Amir H. Fallahi, P.E.

Principal

Page 316 of 471 ends

15.B

Page 1080 of 1962 ends

PAGE 4

EXPERIENCE

SECTION I

Page 317 of 471 ends

15.B

Page 1081 of 1962 ends

PAGE 5

INDUSTRY

RECOGNITION
We have built a culture anchored in our core values, serving as a compass guiding our decisions and actions both
within our teams and with our clients, with client success at the heart. From the moment we engage with a client,
our team strives to understand not only their immediate needs but also their long-term objectives. Through open collaboration, transparent communication, and genuine
trust, we establish strong, unified partnerships that
transcend the typical client-consultant dynamic.

We recognize that every project is unique, presenting its own set of challenges and opportunities. That’s why we
take the time to listen and truly comprehend the intricacies of each client’s goals. Armed with this deep understanding, we leverage our diverse set of talents, expertise, and
creativity to craft innovative solutions that not only meet but exceed expectations.

Our commitment to excellence in engineering means we
invest in continuous learning and development, staying
current on the latest technologies and industry trends to ensure that our solutions are always at the forefront of innovation. But beyond technical prowess, it’s our passion for making a meaningful impact that sets us apart. We
don’t just see ourselves as consultants, we see ourselves as partners in our clients’ success stories.

RTM Engineering Consultants traces its roots back
to 1981 when we were founded as a 3-person firm
specializing in mechanical engineering design for clients in the Midwest, establishing a reputation for reliability and a commitment to excellence in engineering design.

Driven by this commitment and fueled by a passion
for innovation, RTM gradually expanded its scope
of operations beyond regional confines and service
offerings. Today, we are a nationally recognized, multidisciplinary consulting firm licensed in all 50 states and with office locations coast to coast. Even with our steady growth and current widespread presence, we
have remained firmly rooted in our commitment to
maintaining strong local connections with clients, a
cornerstone of our firm’s values and continued success.

NATIONAL RESOURCES | LOCAL RELATIONSHIPS
1981

YEAR FOUNDED
500+

TEAM MEMBERS
24 OFFICES

OUR VALUES

OUR HISTORY
We listen, learn, and
solve together

COLLABORATIVE

COMMUNICATORS
We succeed together
and we fail together
We do the right thing for
our clients and our team
We persistently work to
find the right solution for
the project

OVERALL
UNITY

RESPECT
& TRUST

EXCELLENCE IN

ENGINEERING
rtmec.com Page 318 of 471

15.B

Page 1082 of 1962 ends

PAGE 6

BUILDING SYSTEMS
Mechanical | Electrical | Plumbing | Fire Protection | Technology | Commissioning Construction Administration | Architectural Lighting Design | Acoustics | Refrigeration Arc Flash | TAB | Environmental Design Services

CIVIL ENGINEERING
Land Planning & Site Development | Water & Wastewater | Stormwater Design Transportation | Surveying & Mapping

STRUCTURAL ENGINEERING
Feasibility Studies | Structural Analysis & Design | Seismic Retrofit & Rehabilitation Structural Renovations & Upgrades | Structural Assessments | Structural Investigations Damage Assessments | Contract Plan Review | Peer Review Services

OFFICES COAST TO COAST &
LICENSED IN ALL 50 STATES

CONNECT WITH US
rtmec.com
RTM’s expertise covers a full range of engineering and design services with a multi-disciplinary team approach across all major market sectors. This means that our clients can come to us for all of their building needs, from system upgrades and tenant improvements to large scale new construction projects.

BREWERIES &

DISTILLERIES

RESTAURANT

COMMERCIAL
OFFICE

HOSPITALITY
RETAIL

CULTURAL

INDUSTRIAL
SENIOR
LIVING

ENTERTAINMENT

SCIENCE &

TECHNOLOGY

GOVERNMENT
MIXED
USE

SPORTS &

RECREATION

HEALTHCARE

RESIDENTIAL

TRANSPORTATION
HIGHER

EDUCATION
K-12

EDUCATION
Schaumburg, IL (HQ)
Albuquerque, NM
Avon, CO
Baltimore, MD
Belleville, IL
Boise, ID
Chicago, IL
Corona, CA
Dallas, TX
Davenport, IA
Denver, CO
Evansville, IN
Fort Collins, CO
Irvine, CA
Lakewood, CO
Milwaukee, WI
Orlando, FL
Overland Park, KS
Palm Springs, CA
San Diego, CA
Seattle, WA
Springfield, MO
St. Louis, MO

MARKET SECTORS

OUR EXPERTISE

Page 319 of 471 ends

15.B

Page 1083 of 1962 ends

PAGE 7
RTM’s team of licensed surveyors, experienced crew chiefs, and skilled support staff bring extensive knowledge and expertise to every project. Our field crews are well-versed in handling any survey task, operating under the guidance of licensed professionals and supported by a dedicated office team. To maximize efficiency, the majority of construction staking and preliminary boundary calculations are completed by RTM’s office staff, allowing our field crew to focus on productive, on-site work. Equipped with the latest survey equipment and technologies, our team is trained to deliver precise and efficient results on every project.
rtmec.com
• Construction Staking
• Topographic Design Survey
• Aerial Mapping & Topo
• ALTA/ACSM Land Title Surveys
• Preparation of Legal Descriptions and Plats
• Preparation of Base Maps
• Right-of-Way Alignment Studies
• Record Research and Jurisdictional Documents

CAPABILITIES & SERVICES

OFFICES COAST TO COAST
California • Colorado • Florida • Idaho • Illinois • Indiana • Iowa • Kansas Maryland • Missouri • New Mexico • Texas • Washington • Wisconsin CIVIL ENGINEERING | LAND SURVEYING SERVICES
• Prepare and Process LAFCO Application
• Plan Checking Services for Governmental Agencies
• Property Easement & Encumbrance Exhibits
• Boundary Surveys and Monument Recovery
• Recordation of Boundary Maps
• Tract Maps, Parcel Maps, and Records of Survey
• Establishment of Citywide GPS Network
• Set and Recalibrate Bench Mark Monuments

PROJECT EXPERIENCE
• Municipal Public Works Infrastructure Projects
• Transportation Roadways and Street Improvements
• Storm Drainage, Water Supply, Sanitary Sewer and
Dry Utilities
• Public Park and Street Revitalization
• Land Development Projects
• Upgrading / Modifying Developed Properties
• Monitoring Grading / Slope Failures

Page 320 of 471 ends

15.B

Page 1084 of 1962 ends

PAGE 8

WARDLOW ROAD SEWER RELOCATION PROJECT
Client: City of Corona, Department of Water and Power
Design and survey and for the construction of approximately 350-feet of 28-inch HDPE sewer main. Design included a jackand-bore crossing of the Caltrans 91 freeway right-of-way, and the preparation of easement legal documents and plats.

Contact: Mr. Vernon Weisman, District Engineer
P: (951) 279-4912
E: [email protected]
Design Complete: 2018
Construction Complete: 2019

OVERLOOK STREET REHABILITATION
Client: City of Corona, Public Works Department
Survey services for a 2000-foot section of Overlook Street as well as improvements at the intersections at Nelson Street, Courtney Street, Duncan Way and Howe Street. The Scope of the project included creating detailed topographic survey map using conventional methods, researching and gathering right-of-way and property line limits, existing utilities investigation.

RTM Surveyors also performed construction staking.

Contact: Mr. Peter Ramey (Original Project Manager - retired) Mr. Savat Khamphou, Director of Public Works
Department
P: (951) 817-5765
Design Complete: 2019
Construction Complete: 2020
McCALL BOULEVARD WATERLINE
Client: Eastern Municipal Water District
Design and construction surveying services for the McCall Boulevard Water Line. The project involved approximately 1000 linear feet of new waterline installation within McCall Blvd including aerial and topographic survey, layout of pothole locations, provision of all as-built locations, and construction staking.

Contact: Mr. Nate Olivas, Associate Civil Engineer - Water CIP P: (951) 928-3777, Ext. 4447
E: [email protected]
Design Complete: 2019
Construction Complete: 2021

KELLER ROAD AND WINCHESTER ROAD
Client: DR Horton
Roadway, water, sewer and drainage infrastructure
improvements associated with the 196-acre Keller Crossing Development in the Winchester area within unincorporated Riverside County. Surveying services included preparation of legal descriptions, easements, topographic survey, Quit Claim, and preparation of parcel and tract maps.

Contact: Mr. Jon Myhre
P: (951) 739-5499
Design Complete: 2019
Construction Complete: 2021

LIVE OAK TRAIL STORM DRAIN DESIGN
Client: City of Yorba Linda, Department of Public Works Department
City of Yorba Linda Live Oak Trail Storm Drain included over 650 feet of 18-inch storm drainpipe, three new catch basins located within Live Oak Trail and the reworking of portions of the trail surface to provide positive flow towards the new catch basins. RTM survey crews performed design survey
including topographic mapping, dipping of existing manholes and catch basins, and surface culture pickups in-order to prepare base mapping for the project.

Contact: Mr. Jevee Tagarao, Assistant Engineer
P: (714) 961-7100 ext. 5941
E: [email protected]
Design Complete: 2022
Construction Complete: ongoing

PROJECT EXPERIENCE &

REFERENCES

Page 321 of 471 ends

15.B

Page 1085 of 1962 ends

PAGE 9

COLLABORATION & COMMUNICATION
RTM is primed to deliver on-call land surveying servcies to the City of Hemet, incuding various surveying tasks to support the City construction projects. Our integrated project approach allows us to provide extremely responsive and agile services while also delivering high quality engineering. A survey and mapping team will be responsible for the day-to-day management, communication, and design coordination with the City. This team has extensive experience working on public projects and understands the standards and requirements specific to these types of projects.

RTM uses a variety of means and methods to manage and perform the company’s projects. Weekly meetings along with developed schedules help track project deliverables and dates as well as estimated completion percentages. Using this information, RTM delegates responsibilities as required for each task in the projects, from documentation work to assessment reports.

QUALITY ASSURANCE
RTM endeavors to prepare drawings and specifications that exceed industry standards, are free of errors, and effectively convey our design intent. Our method for ensuring these goals are being met is a two-part process that we refer to as Quality Assurance & Quality Control or QA/QC. This process is an important part of delivering engineering excellence, one of the RTM Core Values. The QA/QC process is to be followed on the smallest to the largest projects, allowing our team to control costs or delays throughout the entirety of the project by catching any issues that may arise before they become a costly change order to our client.

Quality Assurance starts with our Project Plan from the outset of the project. This plan details not only the schedule but clarifies each step in the scope of work, who will perform it, who will check the work and who will provide the independent third-party review of the work. We understand that every project encounters roadblocks at some point and having the plan prepared at the outset of the project allows the project manager to react to unforeseen circumstances, make adjustments and stay on schedule and within budget.

Our Quality Control process consists of procedures for evaluating completed activities and elements of the design for conformance with the requirements. It involves other people, outside of the project team, checking the work of our project team members to ensure everything is meeting standards. This process takes place when a project is considered finished and will go to both the engineer of record and to another RTM studio for review and comment.

Delivering engineering excellence that has been reviewed by both engineer and outside party for engineering competence and correctness is the objective of the QA/QC process. It offers significant value as potential conflicts and issues can be identified as early as possible which reduces risks, delays, and added costs. Managing the quality of a project is the responsibility of both individuals and the team as a whole. RTM’s expertise in evaluating quality is a benefit to our clients and just one of them many ways we can help them achieve their goals.

PROJECT APPROACH

Page 322 of 471 ends

15.B

Page 1086 of 1962 ends

PAGE 10

PERSONNEL

SECTION II

Page 323 of 471 ends

15.B

Page 1087 of 1962 ends

PAGE 11
Amir H. Fallahi, P.E.

Principal in Charge

EDUCATION
California Polytechnic University, Pomona
Bachelor of Science, Civil Engineering

REGISTRATIONS
Registered Civil Engineer in CA (#55534) and AZ (#30008)

ORGANIZATIONS
American Society of Civil Engineers
Building Industry Association

RELEVANT EXPERIENCE
City of Menifee, Menifee, CA. Mapping services for projects in the City of Menifee including:

Newport Road, Goetz Road Realignments and Salt Creek Drainage Improvements - Audie Murphy Ranch.

Eastern Municipal Water District, Riverside County, CA. Several improvement projects including:

Dale 2199c PZ Looping Water Pipeline located in the City of Moreno Valley. Provided research, aerial and topographic surveys and base mapping for the 40-acre site.

Approximately 1000 linear feet of new waterline installation within McCall Blvd. including aerial and topographic survey, layout of pothole locations, provision of all as-built locations, and construction staking.

Ridgemoor Road Water Pipeline Project in the Sun City. Provided research, aerial and topographic surveys for approximately 5000 linear feet of new waterline.

Fox Street Water Tank Replacement. Survey Coordinator providing surveying services for the design and construction staking for this project.

Keller Road and Winchester Road, Riverside County, CA. Roadway, water, sewer and drainage infrastructure improvements associated with the 196-acre Keller Crossing Development in the Winchester area within unincorporated Riverside County. Surveying services included preparation of legal descriptions, easements, topographic survey, Quit Claim, and preparation of parcel and tract maps.

BACKGROUND
Amir has years of professional
engineering experience in design
and management of public works
and land development projects
throughout Southern California.

As a Principal his responsibilities
include management and
supervision of a wide variety of
public works infrastructure projects
for agencies, cities, and private
sector clients. He is continually
involved in the scheduling, project
status, and client relationship
building.

YEARS OF EXPERIENCE
1 year with RTM
40 years total

MARKET EXPERTISE
Municipal

CONTACT
[email protected]

Page 324 of 471 ends

15.B

Page 1088 of 1962 ends

PAGE 12
Rob Scipio, P.L.S.

Project Manager | Director of Surveys & Mapping

EDUCATION
SJC Southern California
Joint Apprenticeship 1989 IUOE Local 12

REGISTRATIONS
Professional Land Surveyor in California, #9154

RELEVANT EXPERIENCE
Eastern Municipal Water District, Riverside County, CA. Several improvement projects including:

Dale 2199c PZ Looping Water Pipeline located in the City of Moreno Valley. Provided research, aerial and topographic surveys and base mapping for the 40-acre site.

Approximately 1000 linear feet of new waterline installation within McCall Blvd. including aerial and topographic survey, layout of pothole locations, provision of all as-built locations, and construction staking.

Ridgemoor Road Water Pipeline Project in the Sun City. Provided research, aerial and topographic surveys for approximately 5000 linear feet of new waterline.

Boundary survey, Record of Survey and construction staking for the Fox Street Water Reservoir.

Warlow Road Sewer Improvements, City of Corona, CA.

Design and survey and for the construction of approximately 350-feet of 28-inch HDPE sewer main. Design included a jack-and-bore crossing of the Caltrans 91 freeway right-of-way, and the preparation of easement legal documents and plats.

City of Menifee, Menifee, CA. Surveying services for the design of major infrastructure improvements associated with the 78.5 acre, 356 residential community known as Menifee Village.

City of Ontario, Ontario, CA. Oversaw design survey and construction staking for infrastructure improvements associated with the Gardens Development.

Amazon, San Diego, CA. Prepared an ALTA survey map for a large Amazon property.

BACKGROUND
Rob has extensive experience in
Land Surveying, Mapping and
Construction Staking throughout
Southern California.

YEARS OF EXPERIENCE
1 year with RTM
33 years total

MARKET EXPERTISE
Municipal

CONTACT
[email protected]

Page 325 of 471 ends

15.B

Page 1089 of 1962 ends

PAGE 13
Donald W. Bergh, P.E.

Senior Civil Engineer | QAQC

EDUCATION
California State Polytechnic University at Pomona
Bachelor of Science, Civil Engineer

REGISTRATIONS
Registered Civil Engineer in CA (#28949) and AZ (#27542) Certified SWPPP QSD/QSP CA #00690

ORGANIZATIONS
American Society of Civil Engineers

RELEVANT EXPERIENCE
City of Menifee, Menifee, CA. Infrastructure improvements for the 78.5-acre, 356 residential community included preparation of legal descriptions, easements, topographic survey, Quit Claim, and preparation of parcel and tract maps: as well as design of road and drainage, water, sewer and recycled water utility design.

City of Colton, Roquet Development, Colton, CA. A 334-acre, 950 residential planned development. Infrastructure improvements included widening of La Cadena Road, two miles of 24-inch PVC waterline and connections to existing facilities, sewer, force main
City of Corona’s Storm Drain Line 52. The project included 4,000 feet of storm drain that serves a drainage area of 150 acres with a design flow of 400 cfs. The scope included preparation of a Preliminary Design Report, relocation of existing wet and dry utilities, boring under BNSF railroad tracks, connection to RCFC’s Temescal Wash, and coordination with the I-91 widening project by Caltrans, as well as potholing and mapping of nearly 200 utility lines within the project limits.

RCFC&WCD’s Lakeland Village MDP Lines H. The scope included preparation of a hydrology study with the proposed alignments and hydraulic calculations, final main line hydrology, catch basin hydrology, storm drain hydraulics, structural calculations, D-load calculations for 100-year storm flow generating flows exceeding 1,300 cfs.

City of Yorba Linda Live Oak Trail Storm Drain. Served as the Senior Drainage Engineer for the hydrology study and design of a Storm Drain flowing west within Live Oak Trail and Pepper Avenue to Village Center Drive.

BACKGROUND
Donald has served in a variety of
engineering management roles.

He has extensive experience
working with Public Agencies as
well as serving as Deputy City
Engineer for the cities of Moreno
Valley, Twentynine Palms and
Coachella and Flood Control
Engineer for the City of Hemet. His
experience includes design, project
management, and QC/QA plan
checking, as well as construction.

YEARS OF EXPERIENCE
1 year with RTM
24 years total

MARKET EXPERTISE
Municipal

CONTACT
[email protected]

Page 326 of 471 ends

15.B

Page 1090 of 1962 ends

PAGE 14
Mike Anderson
Mapping Manager

EDUCATION
Phoenix Institute of Technology
Riverside City College

RELEVANT EXPERIENCE
City of Menifee, Menifee, CA. Mapping services for projects in the City of Menifee on the following projects:

Lindenberger Road and Dolmenigoni Parkway Roadway and Utility Improvements – Menifee Village.

Garbani Road Widening and Water Infrastructure Improvements – Braverde Development.

Newport Road, Goetz Road Realignments and Salt Creek Drainage Improvements - Audie Murphy Ranch.

Watson, Briggs and Sultanas Road, Water, Sewer and Recycle Water Improvements– Richland Communities.

Encanto, Chambers and Rouse Roadway, Water, Sewer and Drainage Improvements – Legado at Fleming Ranch Development.

Sherman Road Improvements – Legado Development.

Eastern Municipal Water District, Riverside County, CA. Several improvement projects including:

Dale 2199c PZ Looping Water Pipeline located in the City of Moreno Valley. Provided research, aerial and topographic surveys and base mapping for the 40-acre site.

Approximately 1000 linear feet of new waterline installation within McCall Blvd. including aerial and topographic survey, layout of pothole locations, provision of all as-built locations, and construction staking.

Ridgemoor Road Water Pipeline Project in the Sun City. Provided research, aerial and topographic surveys for approximately 5000 linear feet of new waterline.

Boundary survey, Record of Survey and construction staking for the Fox Street Water Reservoir.

Warlow Road Sewer Improvements, City of Corona, CA.

Design and survey and for the construction of approximately 350-feet of 28-inch HDPE sewer main. Design included a jack-and-bore crossing of the Caltrans 91 freeway right-of-way, and the preparation of easement legal documents and plats.

BACKGROUND
Mike has extensive experience
in Land Surveying and Mapping
including the preparation of Parcel
and Tract Maps, Easements, Legal
Descriptions, Lot Line Adjustments,
Centerline Ties, ALTA, Record of
Survey, Quitclaim, Certificate of
Corrections, and linework and
closure calculations. He also has
experience with Caltrans-owned
utility and right-of-way plans,
telecommunication conduit and
cellular service site plans.

YEARS OF EXPERIENCE
1 year with RTM
42 years total

MARKET EXPERTISE
Municipal

CONTACT
[email protected]

Page 327 of 471 ends

15.B

Page 1091 of 1962 ends

PAGE 15
Ben Lozolla
Field Supervisor

EDUCATION
Southern California Joint Apprenticeship Committee IUOE Local 12 Certified Journeyman Chairman/Chief of Party Program
Certified GPS/GNSS Post-Processing

RELEVANT EXPERIENCE
City of Menifee, Menifee, CA. Mapping services for projects in the City of Menifee on the following projects:

Design of Phase I and Phase II roadway improvements to a half mile section of Adams Street in the Romoland area for the City of Menifee.

The project included topographic survey, right-of-way research, and identifying the location of underground utilities.

Topographic survey for the 79-acre Menifee Village project to accommodate infrastructure design road and drainage improvements as well as water, sewer and recycled water utilities.

Eastern Municipal Water District, Riverside County, CA. Several improvement projects including:

Dale 2199c PZ Looping Water Pipeline located in the City of Moreno Valley. Provided research, aerial and topographic surveys and base mapping for the 40-acre site.

Approximately 1000 linear feet of new waterline installation within McCall Blvd. including aerial and topographic survey, layout of pothole locations, provision of all as-built locations, and construction staking.

Ridgemoor Road Water Pipeline Project in the Sun City. Provided research, aerial and topographic surveys for approximately 5000 linear feet of new waterline.

Fox Street Water Tank Replacement. Survey Coordinator providing surveying services for the design and construction staking for this project.

City of Corona, Corona, CA. Capital improvement projects including:

Hayden Avenue and Howe Street Waterline Replacement and relocation of 740 feet of 8-inch DIP domestic waterline.

City of Corona Wardlow Road Sewer included 350 LF of 28-inch HDPE with a 42-inch steel casing and a jack-and-bore crossing of the Caltrans 91 Freeway.

Home Gardens Water Transmission Line. Topographic survey as well as providing detailed sketches of conflicting Storm Drain utilities.

Keller Road and Winchester Road, Riverside County, CA. Roadway, water, sewer and drainage infrastructure improvements associated with the 196-acre Keller Crossing Development in the Winchester area within unincorporated Riverside County. Surveying services included preparation of legal descriptions, easements, topographic survey, Quit Claim, and preparation of parcel and tract maps.

BACKGROUND
Ben serves as the Field Supervisor
for RTM Engineering and has
extensive experience in Land
Surveying and Construction Staking
throughout Southern California.

YEARS OF EXPERIENCE
1 year with RTM
24 years total

MARKET EXPERTISE
Municipal

CONTACT
[email protected]

Page 328 of 471 ends

15.B

Page 1092 of 1962 ends

PAGE 16

FEE SCHEDULE

SECTION III

Page 329 of 471 ends

15.B

Page 1093 of 1962 ends

PAGE 17

SCOPE & FEE SCHEDULE
RTM will provide a proposal with a firm-fixed fee for each unique scope item at the rates included as specific projects are identified within the on-call contract.

FEE SCHEDULE
RTM engineering consultants | 357 N. Sheridan Street, Suite 117, Corona, CA 92878

HOURLY RATE SCHEDULE FOR RTM ENGINEERING CONSULTANTS
OFFICE ENGINEERING:

PRINCIPAL / DEPARTMENT HEAD $210
PROJECT MANAGER $190
PROJECT ENGINEER $175
DESIGN ENGINEER $150
DESIGNER $140
CADD TECHNICIAN $130
WORD AND DATA PROCESSING $100
FIELD ENGINEERING:

OFFICE SURVEYOR $185
OFFICE SURVEY TECH $150
ONE-PERSON SURVEY CREW $175
TWO-PERSON SURVEY CREW $260
THREE-PERSON SURVEY CREW $310
FIELD ENGINEERING - PREVAILING WAGE:

ONE-PERSON SURVEY CREW $195
TWO-PERSON SURVEY CREW $310
THREE-PERSON SURVEY CREW $360
These rates will remain in effect until January 1, 2025, at which time they may change. Should rates change December 31, 2024, the rates will apply only to that portion of work remaining to be completed after January 1, 2025. Contract limits, less amount invoiced prior to January 1, 2025 will be adjusted according to the new rates.

All out-of-pocket expenses, such as filing fees, printing, delivery and reproduction costs will be extra. These reimbursables will be invoiced at our cost plus 10%. $210
$165
$190
$285
$340
$220
$350
$405

Page 330 of 471 ends

15.B

Page 1094 of 1962 ends

For
On-Call Land Surveying Services
Prepared for:

Prepared by:

Page 331 of 471 ends

15.B

Page 1095 of 1962 ends

I:\_Proposals\2024\EKO\City of Hemet On-Call Survey\Docs\2-Cover Letter.doc Corporate Office: 3990 Ruffin Road, Suite 120 ■ San Diego, CA. 92123 ■ Phone (858) 560-1141 ■ Fax (858) 560-8157 41689 Enterprise Circle North, Suite 126■ Temecula, CA. 92590 ■ Phone (951) 695-8900 ■ (951) 695-8901 October 7, 2024
City of Hemet
445 E. Florida Avenue
Hemet, CA 92543
RE: Proposal for On-Call Land Surveying Services for the City of Hemet Hemet, CA
To Whom it May Concern,
SB&O, Inc. is a well-qualified and experienced firm with over 50 years of surveying and civil engineering experience in Southern California. We are fully capable of performing the work outlined in the Request for Proposal (RFP), and will commit the survey personnel and equipment to complete the project.

During our 57 year history, we have successfully completed numerous survey projects, ranging from construction staking of the 26-mile Eastern Transportation Corridor Toll Road in Orange County, to providing “on-call” surveying services to the San Diego Water Authority and the Cities of Temecula, Murrieta and Rancho Cucamonga. We perform the services requested in the RFP on a daily basis and, as you know, we have successfully completed multiple survey projects for Cucamonga Valley Water District (CVWD).

We appreciate the opportunity to submit this Proposal and look forward to working with the City of Hemet. No exceptions have been taken with regard to the requirements listed in the RFP.

Sincerely,
SB&O, INC.

Eric K. Osterode , PLS 9371
Survey Department Manager
EKO/jh

Page 332 of 471 ends

15.B

Page 1096 of 1962 ends

Table of Contents
Section 1: Firm Description
➢ Firm Profile
➢ Staffing
➢ SB&O Services
Section 2: Firm Experience
➢ Similar Experience
➢ Client References - SB&O, Inc.

Section 3: Project Approach
➢ Project Understanding
➢ Project Approach
➢ Project Management Approach
➢ Quality Assurance / Control Approach
➢ Why Hire SB&O?
Section 4: Resumes of Key Individuals and Organizational Chart ➢ Organizational Structure
➢ Organization Chart
➢ Resumes – SB&O, Inc.

Section 5: Insurance
➢ Certificate of Insurance

Page 333 of 471 ends

15.B

Page 1097 of 1962 ends

Section 1: Firm Description

FIRM PROFILE
SB&O, Inc. is a multi-disciplined firm, founded in 1967, specializing in urban and land planning, civil engineering and land surveying services for public and private development clients. SB&O has offices in Temecula and San Diego, with a strong presence in Riverside County since 1998. Some of our key personnel have been working in the area since 1987.

Since our inception, we have been successfully providing engineering services on a variety of public works and private development projects throughout Southern California. Our engineering and surveying capabilities cover nearly every form of property development, ranging from public buildings, schools, hospitals, military facilities, roadways, commercial and industrial buildings, and residential projects, to large master planned communities, and construction staking for the 28-mile Eastern Transportation Corridor Toll Road.

Through past and current relationships with various Cities, Counties, Municipalities and private developers, SB&O has vast experience to draw upon. Our personnel are all seasoned professionals, with a wide range of experience in site planning, design and construction, developed through hundreds of successfully completed projects. This experience allows SB&O to have a unique understanding of our clients' needs. We pride ourselves in developing a strong working relationship with our clients, identifying their project goals and objectives, then, thoroughly researching the project at inception to provide a complete up front project analysis that identifies the project’s constraints and opportunities. We believe this is the most important step in the development process, not only from a technical design standpoint but also from a regulatory, administrative and overall project cost standpoint.

SB&O actively stays current with the latest Storm Water Quality Regulations, Low Impact Design (LID), and LEED requirements. We provide innovative methods of integrating these requirements into the site design that are both effective and cost efficient. By offering QSP/D services during construction, we are able to assist our clients in achieving storm water compliance.

Throughout our history, we have maintained a small to mid-size status so our company principals are available to provide their knowledge and experience to each project. By limiting our size, our firm is large enough to provide the necessary resources to tackle large-scale projects, but small enough to allow company principals to be “hands on” project managers. This unique approach ensures that our clients receive the highest level of attention, experience, and quality service. We believe this is what separates us from our competition.

This approach is supported by the fact that the majority of our new business is directly attributable to repeat clients.

MISSION STATEMENT: SB&O strives to meet the needs of our clients and improve the quality of life for the people in our communities through our understanding of the unique goals, objectives and challenges of our projects, and our dedication to innovative and responsible design.

Since 1967, SB&O has built a
reputation on unparalleled
dedication to client satisfaction.

Page 334 of 471 ends

15.B

Page 1098 of 1962 ends

Section 1: Firm Description
BUSINESS: A multi-disciplined firm, founded in 1967, specializing in urban and land planning, civil engineering, land surveying and mapping, construction staking, and expert witness services.

CORPORATE EXECUTIVES: Aaron W. Parker, P.E., President
P. Randy Safino, P.E., CEO
Michael S. Butcher, P.L.S., Vice President
Allen L. Butcher, P.E., Vice President
Don Brooks, P.E., President-Inland Empire Division
Daniel J. O’Rourke, P.E., Vice President
Stephen C. Ott, P.E., Vice President
CORPORATE OFFICE: 3990 Ruffin Road, Suite 120
San Diego, CA 92123
858-560-1141
858-560-8157 fax
www.sboinc.com
BRANCH OFFICE: 41689 Enterprise Circle North, Suite 126 Temecula, California 92590
951-695-8900
CLIENTELE: Residential, commercial and industrial developers and contractors; public agencies and municipalities, architectural firms; large landowners; attorneys; insurance companies.

DIR REGISTRATION NO: 1000004174

STAFFING
SB&O, Inc. has offices located in Temecula and San Diego. As a firm we have had a strong presence in Riverside County since 1998 and key personnel since 1987. Both offices have on-going work in Riverside County. Work for the On-call Land Surveying Services will be performed out of the Temecula office. Current staffing levels are:

Temecula office San Diego office (Corporate Office)
➢ Three Registered Civil Engineers ➢ Five Registered Civil Engineers ➢ One Licensed Land Surveyor ➢ Three Licensed Land Surveyors ➢ Two Graduate Engineers (EIT) ➢ Five Graduate Engineers ➢ Three Design Draftsmen ➢ Four Design Draftsman
➢ Two active Survey Crews (with equipment and
vehicles for one additional Crew)
➢ Two active Survey Crews (with equipment and
vehicles for one additional Crew)
➢ One administrative support staff ➢ Three administrative support staff

Page 335 of 471 ends

15.B

Page 1099 of 1962 ends

Section 1: Firm Description

SB&O SERVICES
Civil Engineering
• Site Grading (Rough &
Precise)
• Utility Plans/Sewer, Water &
Storm Drain
• Construction Cost Estimates
• Tentative & Final Subdivision
Mapping
• Condominium Plans • Construction Coordination • Hydrology & Hydraulic Studies & Calculations
• FEMA Revisions
(CLOMR/LOMR)
• Storm Drain Facilities • Detention Basin Design
• Pump Stations (Sewer &
Storm Drain)
• Retaining Walls • Erosion Control Plans
• Water System Network
Analysis
• Storm Water Pollution
Prevention Plan Preparation
• NPDES Permit Assistance
• Water Quality Management
Plans
• As-built Drawings • HOA Exhibit Preparation
• Roads/Transportation • Park & Recreational Facilities • Parking Facilities • Traffic Signal System
Design
Land Planning
• Feasibility Studies • Specific Plans/Precise Plans • General Plan Amendments • Land Use/Zoning Permit
Processing
• Site Planning • Environmental Impact
Evaluation
• Planned Commercial,
Residential & Industrial
Developments
• Storm Water Management
Analysis
Land Surveying & Mapping
• Topographic Survey • Aerial Control Survey
& Mapping
• Monumentation Surveys
• HD Survey – 3D Laser
Scanning
• Hydrographic Survey • GPS Surveys
• Boundary Survey • Record of Survey Maps • ALTA Survey Maps • Parcel Maps • Subdivision Maps • Condominium Plans
• Legal Descriptions & Plat
Maps
• Construction Staking • As-built Surveys
• Right-of-way Engineering • Cadastral Surveys • Lot Line Adjustments Support Services
• Technical Research &
Reports
• Client Representation • Third Party Engineering
Services
• Specification Preparation • Bid Analysis Assistance • Shop Drawing Review • Expert Witness Services • Peer Review

Page 336 of 471 ends

15.B

Page 1100 of 1962 ends

Section 2: Firm Experience

SIMILAR EXPERIENCE
On a daily basis, SB&O provides the diverse Civil Engineering services the City requires, from conceptual project planning through design and construction. We work on a wide variety of public and private infrastructure projects similar to the work described in the Request for Proposal (RFP) for On-call Land Surveying Services.

Throughout our 57 year history, SB&O has worked successfully for Public Sector clients from various branches of the government throughout Southern California. Clients include:
• City of Murrieta
• City of Temecula
• City of Moreno Valley
• City of Riverside
• City of Ontario
• City of Rancho Cucamonga
• City of Upland
• Cathedral City
• City of San Diego
• County of San Diego
• SANDAG
• City of Carlsbad
• Caltrans
• United States Navy
• United States Marine Corps
• Cucamonga Valley Water
District
• San Diego County Water
Authority
• Murrieta County Water
District
• Western Municipal Water
District
• San Diego State University
• Southwestern Community
College District
• California State University
San Diego
• Chaffey Joint Union High
School District
• Poway Unified School
District
• Encinitas Unified School
District
• San Marcos Union High
School District
• Harvey Mudd College
Below are similar projects with client references, for recent projects. Following the client references are project profiles of other representative projects that further demonstrates SB&O’s diversity and experience for review and consideration:

CLIENT REFERENCES: SB&O
We have provided references from the public and private sectors that we feel would give opinions for varied viewpoints. Please feel free to contact them. We can also provide additional references upon request.

Agency Name & Contact Project Description
City of Temecula
Amer Attar, PE
Engineering Manager
951.506.5162
[email protected]
Various On-Call Public Improvement Plans
All projects are ongoing as of April, 2023:
• Ronald Reagan Sports Park – ADA Improvements (PW18-16) • Rainbow Canyon Road Rehabilitation Project (PW22-15)
• Sixth Street Sidewalk Improvements – Front Street to Mercedes Street (PW22-16)
• 5th Street Bulbout Street Improvements (PW23-24)
• Ronald Reagan Sports - Conceptual Trails Design (PW22-05) • Pauba Road Widening – Elinda Road to Showalter Road (PW19-20)

Page 337 of 471 ends

15.B

Page 1101 of 1962 ends

Section 2: Firm Experience
Agency Name & Contact Project Description
City of Murrieta
James Ozouf, PE
Senior Civil Engineer
951.461.6075
[email protected]
On-Call Engineering Services, to include:
• Clinton Keith Culvert Rehabilitation.
• Sam’s Club Turn Lane / Murrieta Hot Springs Road Improvements.

Agency Name & Contact Project Description
City of Murrieta
Jeffrey Hitch, PE
Engineering Manager
951.461.6076
[email protected]
Guava Street Improvements (CIP 8059)
Design of major classification roadway from Jefferson Avenue to proposed bridge at Murrieta Creek. Project included design of Riverside County Flood Control Line “D” which passes through site and empties into Murrieta Creek.

Project Cost - $4.7 Million
Project Description
City of Murrieta
Bob Moehling, PE
Director of Public Works
951.461.6036
[email protected]
Murrieta Hot Springs Road Widening (CIP 8079)
Roadway widening project from four-lane to six-lane arterial highway. Project includes leading a multi-disciplined team for environmental, permitting, traffic signal design, design surveys, aerial topography and cross sections, roadway and drainage design, hydrology and hydraulic studies, WQMP and SWPPP. Design challenges include extensive use of retaining walls to protect existing improvements and apartment structures.

Project Cost - $2.8 Million
Agency Name & Contact Project Description
Cornerstone Communities
Jack Robson | VP of Land
Planning & Development
858.458.9700 Ext. 120
jrobson@cornerstonecomm
unities.com
Promontory
Engineer and Surveyor of Record for 160-acre Master Planned Community located Southeast of the French Valley Airport. Design services included preparation of a Master Tentative Map, including backbone infrastructure and ultimate roadway design, Final Subdivision Maps, improvement and rough grading plans. Individual subdivision maps were prepared for the four neighborhoods totaling 268 lots for single family residential and included open space dedications, park lots and dedicate storm facility lots. Survey efforts included construction staking for rough grading, improvements and final monumentation for the subdivision mapping.

Project Cost – $1.7 Million

Page 338 of 471 ends

15.B

Page 1102 of 1962 ends

Section 3 – Project Approach

PROJECT UNDERSTANDING
We understand the RFQ as published by the City is requesting interested firms to submit their qualifications so the City can develop a list of Pre-Qualified Survey firms to assist the City on an as-needed basis for future City projects.

Through past and current relationships with various Cities, Counties Redevelopment Agencies, and private developers throughout Southern California, SB&O has developed a wide range of experience to draw upon. That experience allows SB&O to have a unique understanding of what our clients and their projects require from a technical and regulatory standpoint, and the level of communication and commitment required to successfully assist in reaching their goals.

PROJECT APPROACH
The following is a general outline of our approach to define, organize, manage and deliver a successful On-Call City project.
▪ Discovery – Understanding the Specifics: Once a request is made by the City, SB&O will perform preliminary project research and prepare an agenda of items for further discussion with City staff and the design team. We will record the objectives, goals, specific project concerns, desired schedule, budget requirements, team structure, responsibilities, protocols and any other concerns the City may have following this preliminary discussion.
▪ Assignments - Project Organization: Based on the specific project requirements and the required team structure, SB&O will organize the project components and define points of contact for all involved parties, chain of command, project roles and responsibilities, and project deliverables. The assigned SB&O Project Manager will be the single point of contact between SB&O and the City and will be responsible for assigning appropriate staff and making recommendations for subconsultants necessary for successful completion of the project.
▪ Definition - Scope of Work: Following discovery and identification of the project team, SB&O will prepare a preliminary scope of work and related fee for City review and approval. The final scope of work will address the City’s concerns and vision of the finished project so there is a clear understanding of expectations and deliverables.
▪ Communication and Reporting - Work closely with City staff and Design Team: During the course of the project, SB&O will work as an extension of the City’s staff. We will communicate regularly with the City and Design Team and keep everyone informed through meetings, telephone contact, memos and email. We propose, if warranted by the project, monthly progress meetings to be held between the SB&O and the City Project Manager, at a minimum utilizing meeting agendas and meeting minutes with action items and responsibilities for maximum meeting efficiency. We do not anticipate these meetings to last more than an hour, and certainly do not intend for them to replace informal day-to-day communication.

The Project Manager assigned to your project will be available to City staff at any time, either by telephone or in person.
▪ Management - Utilize and Apply Sound Project Management Tools: SB&O has established project management techniques that we utilize to successfully complete projects on time and on budget. In order to assist our project managers, we (as a company) implement the following:

A) Backlog and Scheduling: To insure we meet our long-term and short-term deadlines and proper staffing levels, each month all Project Managers are required to prepare a six-month backlog of projects currently under contract and projects that are expected to commence within the same sixmonth period, as well as a weekly schedule. The backlog compares projected person-hours against available person-hours. If there is a staff shortage, working hours are increased or additional staff is hired. Weekly schedules are used to assign staff to projects and to determine the number of hours each staff member needs to work to meet those schedules.

B) Weekly staff meetings: To discuss status and resource requirements and assign staffing for all current projects. Project Managers are responsible for coordinating the client’s schedules against

Page 339 of 471 ends

15.B

Page 1103 of 1962 ends

Section 3 – Project Approach
the in-house schedules for any particular week to ensure proper staffing levels and be certain milestone submittals are not missed.

C) Budget tracking: Our accounting system allows us to determine where the project budgets lie on any given day. We do not rely on reports and invoices at months-end to determine progress versus budgets expended, we do this on a weekly basis. As our client, the City will receive a monthly invoice that will include a spreadsheet with all work tasks appropriately labeled with the amount expended and percent complete clearly identified. The format of the spreadsheet will be discussed and tailored to the City’s needs at the onset of the project. ▪ Monitoring - Project Fees and Schedule: SB&O will prepare a schedule at the onset of the project through communication with the City staff. The schedule will be reviewed and updated regularly in conjunction with other project management tools to monitor progress and ensure project tasks and milestones are completed on time.
▪ Implement Quality Assurance and Quality Control Procedures: SB&O has established procedures for Quality Assurance and Quality Control which are implemented throughout the design process and prior to submittal for reviews and approvals. These procedures are outlined below under Quality Assurance / Control Approach.

PROJECT MANAGEMENT APPROACH
Each of our Project Managers is also a principal in the Company. The individual assigned to manage your project and the direction of subconsultants is authorized to make decisions and command the resources of the company in order to keep your project on time and within budget. Our approach to the management of all projects is that of communication, accessibility, service and timeliness. We understand the City has elected to hire an outside consultant, and that the consultant's staff needs to act as an extension of City staff and will be expected to conduct themselves accordingly.

QUALITY ASSURANCE / CONTROL APPROACH
Quality control is a constant process at SB&O. Our staff and subconsultants are guided by internally established design and drafting standards and the professional judgement of our Project Managers. Quality Control reviews of project deliverables are performed at each milestone delivery, and during the course of the project as “over the shoulder” reviews for further discussion in weekly staff meetings. This approach allows the opportunity for a responsible individual, who may not be involved in the day-to-day process of the project, to review and respond to appearance, and constructability, and value engineering.

WHY HIRE SB&O?
▪ SB&O and our chosen subconsultants have the capabilities and experience to provide all of the Survey services listed in the RFP.
▪ Our approach puts extra effort in the initial phases of the project to identify, and plan for any foreseeable problems so the final process can be a relatively issue-free design event. ▪ Principals have direct roles as Project Managers. This allows the full resources of the company to be at the disposal of the Project Manager.
▪ Company owners, managers and staff collectively understand they are always on call to provide additional time or overtime as necessary to keep a project on schedule. That is the way we operate; we are committed to meeting the schedule and budget.
▪ A major reason for our company’s success is the fact that most of our clients are repeat customers because we successfully complete our projects on schedule and budget.

We understand communication is a key element to the success of any project and strive keep an open line of communication at all times.

Page 340 of 471 ends

15.B

Page 1104 of 1962 ends

Project Team
Organizational Chart
Resumes

Page 341 of 471 ends

15.B

Page 1105 of 1962 ends
Page 342 of 471 ends

15.B

Page 1106 of 1962 ends

1 of 3
Eric Osterode, PLS
Vice President / Survey Manager
Total Years Experience:
27 Years w/SB&O:
20 Education, Specialized
Training, Certifications:

Bachelor’s degree in
Mathematics University of
California Riverside
Experienced in map
projections, GPS,
geodesy, statistics, least
squares, survey adjustment
computations and error
analysis
Training
AutoCAD
MicroStation
Active Registration
(no/yr/discipline/state):

PLS 9371, 2017, Land
Surveying, CA
Municipalities worked
with:

Eric has worked with
Cucamonga Valley Water
District, Caltrans, and
many of the municipalities
in the Inland Empire.

GENERAL QUALIFICATIONS
Eric has over 27 years of professional land surveying experience. He has managed a wide variety of land survey projects including surveys for topographic mapping, geodetic control, right-of-way, boundary, and construction projects.

Most recently, Eric’s responsibilities as the Inland Empire Survey Manager include the management and coordination of construction staking contracts for civil engineering projects, boundary surveys, control surveys, title analysis, topographic mapping, detailed design surveys, ALTA Surveys and mapping. Since joining SB&O, Eric’s wide range of skills and background have enabled SB&O to provide clients with localized and personalized service, keeping true to SB&O’s philosophy of dedication to customer service and satisfaction.

EXPERIENCE
➢ On-Call Surveying Services for the City of Temecula:

Preparation of legals & plats for right-of-way dedications, slope easements, and temporary construction easements.
➢ On-Call Surveying Services for the City of Murrieta:

Preparation of legals & plats for right-of-way dedications, slope easements, and temporary construction easements.
➢ CP7594 Hellman Ave. and 4th St. Property Corner
Documentation Survey: Managed the field survey, data collection, and recordation of pre-construction corner records for the sewer line project in Hellman Ave. and 4th St.
➢ La Senda Road Project No. 7485 Cucamonga Valley Water District: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a topographic strip map. Map included found monuments, street centerlines and right-of-way, property lines, aerial topography and location of wet and dry utilities.
➢ CP7315 Beryl Street: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 2,000 lineal foot topographic survey map. Map included found monuments, street centerline, right-of-way, property lines, location of utilities and utility research.

Page 343 of 471 ends

15.B

Page 1107 of 1962 ends

2 of 3
Eric Osterode, PLS
Vice President / Survey Manager
➢ CP7228 Frontier Parking Lot: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a topographic survey of a vacant parcel adjacent to the District Office, including locations of adjacent street improvements and utilities, and found street centerline monumentation. ➢ CP7025 Gettysburg Street and Well Site #48 and West Liberty Parkway Easement – Cucamonga Valley Water District: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 2,000 lineal foot topographic survey strip map and well site easement. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.
➢ CP7141 Rochester Sewer Main Replacement: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 1,500 lineal foot topographic survey map. Map included found monuments, street centerline, right-of-way, property lines, and location of wet and dry utilities. ➢ CP7025 Gettysburg Street and Well Site #48 and West Liberty Parkway Easement – Cucamonga Valley Water District: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 2,000 lineal foot topographic survey strip map and well site easement. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.
➢ CP7143 Recycled Waterline to Redhill Country Club – Cucamonga Valley Water District:

Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 2,000 lineal foot topographic survey strip map. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.
➢ Jack Benny Drive – Cucamonga Valley Water District: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a topographic survey strip map. Map included found monuments, street centerlines and right-of-way, property lines, and location of wet and dry utilities. ➢ CP6949 Waterline Replacement in Roberds Street –Cucamonga Valley Water District:

Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 700 lineal foot topographic survey map. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.
➢ CP6191/WF 81350 Royer-Nesbit Water Treatment Plant and Lloyd W. Michael Water Treatment Plant: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for the Nesbit plant and base mapping for a record of survey for the Michael plant.

Page 344 of 471 ends

15.B

Page 1108 of 1962 ends

3 of 3
Eric Osterode, PLS
Vice President / Survey Manager
➢ Murrieta Hot Springs Road, City of Murrieta: The project entails both survey and engineering design services for street widening improvements. Responsibilities included managing and post processing of horizontal and vertical control and preparation of field design survey of cross sectional data of approximately 5,300 lineal feet of 4-lane roadway. ➢ Mountain View School District – School Facilities Improvement District No. 2: Responsible for the preparation of legal description and plat of the Mountain View School Facilities Improvement District No. 2.
➢ Ronald Reagan Sports Park Desilting Basin Project: Responsible for preparation of construction calculations, and the post processing of horizontal and vertical control for a 6.5 acre desilting basin in the city of Temecula.
➢ Lancaster Water Treatment Plant: Responsible for 3D model creation of four 70 acre sewer treatment basins for GPS machine control and guidance, construction staking calculations, and management of conventional and GPS horizontal and vertical control for the County of Los Angeles Sanitation District in the City of Lancaster.
➢ Elysian Reservoir Water Quality Improvement Project: Responsible for managing and post processing of horizontal and vertical control and construction calculations for the Los Angeles Department of Water and Power Elysian Reservoir improvement/reconstruction project. ➢ SR Loma Ridge Slope Warranty Project - Caltrans: Responsible for construction staking calculations and post processing of horizontal and vertical control for slope work along the 241 toll road. Prepared CAD 3D model and exhibit of finished slope work. ➢ City of El Segundo Pump Station No. 1 & 7: Responsible for construction staking calculations and post processing of horizontal and vertical control for new wet well, pump station, and 1,100 lineal feet of ductile iron pipe in the City of El Segundo.

Page 345 of 471 ends

15.B

Page 1109 of 1962 ends

1 of 4
Ronnie Placencia
Chief of Parties
Total Years Experience:
31 Years w/SB&O:
22 Education, Specialized
Training, Certifications:

JAC Chief of Parties School,
JAC Apprentice Chainman
School,
40-hour HAZWOPPER
Certification
Active Registration
(no/yr/discipline/state):

LSIT ZF5207 / California
Municipalities worked for:

Counties of Los Angeles,
Riverside, San Bernardino;
Cities of Los Angeles,
Montclair, Ontario, Palm
Springs, Rancho Cucamonga,
San Diego, Upland;
Cucamonga Valley Water
District; Metropolitan Water
District, Hemet Unified
School District, Irvine Unified
School District, San Jacinto
Community College District,
Yorba Linda Unified School
District
UAS Pilot License

GENERAL QUALIFICATIONS
Ronnie began his employment with SB&O, Inc. as a Certified Party Chief in March 2002, and now fills the role of Chief of Parties for the Temecula Survey Department. With over 30 years of experience in the private and public sectors, Ronnie is uniquely qualified to manage a wide array of survey projects.

Ronnie is responsible for project management and business development. His duties include the management of all field-related survey tasks, daily scheduling of survey field crews, and coordination between property owners and developers.

EXPERIENCE
➢ On-Call Surveying Services for the City of Temecula:

Party Chief for the on-call survey contract. Scope of services topographic design surveys, right-of-way engineering and construction staking.
➢ On-Call Surveying Services for the City of Murrieta:

Party Chief for the on-call survey contract. Scope of services topographic design surveys, right-of-way engineering and construction staking.
➢ Soto Street Bridge: Party Chief responsible for horizontal and vertical control and supplemental design survey.
➢ Monte Vista GS-RW1 Monitoring: Party Chief responsible for horizontal and vertical control and supplemental design survey for retaining walls.
➢ CP7594 Hellman Ave. and 4th St. Property Corner
Documentation Survey: Party chief responsible for the field survey and data collection of existing monuments for the recordation of pre-construction corner records for the sewer line project in Hellman Ave. and 4th St.
➢ CP7366 Reservoir 8B: Party Chief in the preparation and delivery of a topographic map of the reservoir site. Map included the locations of the tanks, on-site piping, access road improvements and boundary monumentation.
➢ La Senda Road Project No. 7485 Cucamonga Valley Water District: Party Chief responsible for horizontal and vertical control and supplemental design survey for a topographic strip map. Map included found monuments, street centerlines and right-of-way, property lines, aerial topography and location of wet and dry utilities.

Page 346 of 471 ends

15.B

Page 1110 of 1962 ends

2 of 4
Ronnie Placencia
Chief of Parties
➢ CP7483 Archibald Avenue: Party Chief responsible for horizontal and vertical control and supplemental design survey for a 2700 lineal foot topographic survey strip map. Map included found monuments, street centerline and right-of-way, property lines, aerial topography and location of wet and dry utilities.
➢ CP7313 Pressure Zone 6A: Party Chief in the preparation and delivery of a 1,400 lineal foot topographic survey map. Map included found monuments, street centerline, right-ofway, property lines, location of utilities and utility research. ➢ CP7315 Beryl Street: Party Chief in the preparation and delivery of a 2,000 lineal foot topographic survey map. Map included found monuments, street centerline, right-of-way, property lines, location of utilities and utility research. ➢ CP7316 Tract No. 4578: Party Chief in the preparation and delivery of a 6,000 lineal foot topographic survey map throughout an entire residential community. Map included found monuments, street centerline, right-of-way, property lines, location of utilities and utility research.
➢ CP7318 4th Street: Party Chief in the preparation and delivery of a 1,700 lineal foot topographic survey map. Map included found monuments, street centerline, right-of-way, property lines, location of utilities and utility research. ➢ CP7111 Reservoir 3a: Party Chief responsible for horizontal and vertical control and supplemental design surveys for a topographic survey of an existing reservoir station, including locations of on-site piping, adjacent street improvements and utilities and found street centerline monumentation.
➢ CP7228 Frontier Parking Lot: Party Chief responsible for horizontal and vertical control and supplemental design surveys for a topographic survey of a vacant parcel adjacent to the District Office, including locations of adjacent street improvements and utilities, and found street centerline monumentation.
➢ CP7141 Rochester Sewer Main Replacement: Party Chief responsibilities for 1,500 lineal foot topographic survey map. Map included found monuments, street centerline, right-ofway, property lines, and location of wet and dry utilities. ➢ CP7189 Reservoir 4B Pump Station Improvement: Party Chief responsibilities for preparation and delivery of a topographic survey map of on-site pumping station improvements, including detailed survey of pipe lines and associated equipment. Map included found monuments, street centerline, right-of-way, property lines, and location of wet and dry utilities.
➢ CP7025 Gettysburg Street and Well Site #48 and West Liberty Parkway Easement – Cucamonga Valley Water District: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a 2,000 lineal foot topographic survey strip map and well site easement. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.

Page 347 of 471 ends

15.B

Page 1111 of 1962 ends

3 of 4
Ronnie Placencia
Chief of Parties
➢ CP7143 Recycled Waterline to Redhill Country Club – Cucamonga Valley Water District: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a 2,000 lineal foot topographic survey strip map. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.
➢ Jack Benny Drive – Cucamonga Valley Water District: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a topographic survey strip map. Map included found monuments, street centerlines and right-of-way, property lines, and location of wet and dry utilities.
➢ CP6959 Church Street Lateral – Cucamonga Valley Water District: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a 5,000 lineal foot topographic survey map. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities. ➢ CP6949 Waterline Replacement in Roberds Street –Cucamonga Valley Water District:

Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a 700 lineal foot topographic survey map. Map included found monuments, street centerline and right-of-way, property lines, aerial topography, and location of wet and dry utilities.
➢ CP6955 Sewer Main Replacement in Wilson Avenue: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a 700 lineal foot topographic survey map. Map included found monuments, street centerline and right-ofway, property lines, aerial topography, and location of wet and dry utilities. ➢ CP6191/WF 81350 Royer-Nesbit Water Treatment Plant and Lloyd W. Michael Water Treatment Plant: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a boundary and topographic survey map for the Nesbit plant and a record of survey for the Michael plant.
➢ CP6810 Pump Station 1C-2C Pipeline in Etiwanda Avenue: Party Chief responsible for horizontal and vertical control, and supplemental design surveys for a 6,000 lineal foot topographic survey map. Map included found monuments, street centerline and right-ofway, property lines, and aerial topography. ➢ On-Call Survey Contract, City of Rancho Cucamonga – Various Construction Staking and Design Survey Projects, Rancho Cucamonga, California: Party Chief for the on-call survey contract. The contract included various public improvement projects, including curb and gutter and pavement improvements, storm drain improvements and other capital improvements throughout the City of Rancho Cucamonga. Scope of services included aerial photogrammetry, topographic design surveys, right-of-way engineering and construction staking.

Page 348 of 471 ends

15.B

Page 1112 of 1962 ends

4 of 4
Ronnie Placencia
Chief of Parties
➢ Survey Contract, City of Upland – Various Construction Staking, Design Survey and Monitoring Survey Projects, Upland, California: Party Chief for the on-call survey contract. The contract included various public improvement projects, including curb and gutter improvements, monitoring surveys of the 11th Street Landfill, and other capital improvements throughout the City of Upland. Survey efforts include horizontal and vertical control surveys for aerial photogrammetry, and topographic design surveys within the proposed widening’s. Services also include construction staking, property line retracements, and research of existing County maps and records.
➢ Murrieta Hot Springs Road, Riverside County: The project entails both survey and engineering design services for street widening improvements. As Project Party Chief, responsibilities include horizontal and vertical control for topographic mapping, and detailed design surveys and cross sections of approximately 5,300 lineal feet of 4-lane roadway. ➢ Domenigoni Valley Reservoir (Diamond Valley Lake) - Winchester CA: One of six Survey Party Chiefs for the construction of the west end of Diamond Valley Lake. Duties included daily settlement monitoring at the West Dam prior to actual foundation construction. Monitoring lasted for approximately three months prior to the staking for the Dam. Provided daily settlement monitoring at the Saddleback portion of the project to verify the area was stabilized and suitable for construction. Also provided construction staking for various structures throughout the project, and survey control for the In/Out Channel boring and tunneling operation.
➢ Ronald Reagan Sports Park Desilting Basin Project: Party Chief responsible for the placement of horizontal and vertical control and construction staking of 6.5 acre desilting basin in the city of Temecula.
➢ Lancaster Water Treatment Plant: Party Chief responsible for the placement of horizontal and vertical control and construction staking of four 70 acre sewer treatment basins for the County of Los Angeles Sanitation District in the City of Lancaster. ➢ Elysian Reservoir Water Quality Improvement Project: Party Chief responsible for the placement of horizontal and vertical control and construction staking for the Los Angeles Department of Water and Power Elysian Reservoir improvement/reconstruction project. ➢ SR Loma Ridge Slope Warranty Project - Caltrans: Party Chief responsible for the placement of horizontal and vertical control and construction slope staking alongside the 241 toll road.
➢ City of El Segundo Pump Station No. 1 & 7: Party Chief responsible the placement of horizontal and vertical control and construction staking new wet well, dry well, pump station, and 1,100 lineal feet of ductile iron pipe in the City of El Segundo.

Page 349 of 471 ends

15.B

Page 1113 of 1962 ends

1 of 3
Blake Hatch
Survey Assistant
Total Years Experience:
21 Years w/SB&O:
17 Education, Specialized
Training, Certifications:

Bachelor’s degree in
Mathematics University of
California Riverside
Studies in conformal
mapping, GPS, geodesy,
statistics, least squares,
survey adjustment
computations and error
analysis
Training
AutoCAD
MicroStation
Active Registration
(no/yr/discipline/state):

PLS 9371, 2017, Land
Surveying, CA
Municipalities worked
with:

Eric has worked with
CVWD, Caltrans, and
many of the municipalities
in the Inland Empire.

GENERAL QUALIFICATIONS
Blake has over 19 years of experience with the land survey and civil engineering disciplines. He has been responsible for the preparation of tract and parcel maps, legal descriptions and plats, topographic mapping, design surveys, ALTA surveys, as well as the preparation of of precise grade plans, sewer, water, and street improvement plans.

Most recently, Eric’s responsibilities as the Inland Empire Survey Manager include the management and coordination of construction staking contracts for civil engineering projects, boundary surveys, title analysis, topographic mapping, detailed design surveys, ALTA Surveys and mapping. Since joining SB&O, Eric’s wide range of skills and background have enabled SB&O to provide clients with localized and personalized service, keeping true to SB&O’s philosophy of dedication to customer service and satisfaction.

EXPERIENCE
 CP7594 Hellman Ave. and 4th St. Property Corner
Documentation Survey: Managed the field survey, data collection, and recordation of pre-construction corner records for the sewer line project in Hellman Ave. and 4th St.
 La Senda Road Project No. 7485 Cucamonga Valley Water District: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a topographic strip map. Map included found monuments, street centerlines and right-of-way, property lines, aerial topography and location of wet and dry utilities.
 CP7315 Beryl Street: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a 2,000 lineal foot topographic survey map. Map included found monuments, street centerline, right-of-way, property lines, location of utilities and utility research.
 CP7228 Frontier Parking Lot: Responsible for managing and post processing of horizontal and vertical control, mapping and preparation of field design survey data for a topographic survey of a vacant parcel adjacent to the District Office, including locations of adjacent street improvements and utilities, and found street centerline monumentation.

Page 350 of 471 ends

15.B

Page 1114 of 1962 ends

ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD

PRODUCER CONTACT
NAME:

PHONE FAX (A/C, No, Ext): (A/C, No):

E-MAIL
ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $

PRO- POLICY LOC JECT PRODUCTS - COMP/OP AGG
OTHER: $

COMBINED SINGLE LIMIT
(Ea accident) $
ANY AUTO BODILY INJURY (Per person) $

OWNED SCHEDULED
AUTOS ONLY AUTOS BODILY INJURY (Per accident) $

HIRED NON-OWNED PROPERTY DAMAGE
AUTOS ONLY AUTOS ONLY (Per accident) $
$

OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $
PER OTHSTATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
5/20/2024
License # 0E67768
(619) 788-5795 50206 (619) 574-6288
13056
SB&O, Inc.
3990 Ruffin Road, #120
San Diego, CA 92123
25054
A 1,000,000
PSB0002242 5/30/2024 5/30/2025 1,000,000
Cont Liab/Sev of Int 10,000
1,000,000
2,000,000
2,000,000
Ded 0
A 1,000,000
PSA0001486 5/30/2024 5/30/2025
Comp.: $500 Coll.: $500
A 5,000,000
PSE0001667 5/30/2024 5/30/2025 5,000,000
X 0
A
PSW0001981 5/30/2024 5/30/2025 1,000,000
1,000,000
1,000,000
B Professional Liab. PRB0619118981 5/30/2024 Per Claim 2,000,000 B Ded. $25K Per Claim PRB0619118981 5/30/2024 5/30/2025 Aggregate 2,000,000

PROOF OF INSURANCE

FOR YOUR REFERENCE ONLY
SB&OINC-01 MCCOWANA
IOA Insurance Services
3636 Nobel Drive
Suite 410
San Diego, CA 92122
Ali Smith
[email protected]
RLI Insurance Company
Hudson Insurance Company
X
5/30/2025
X
X
X
X
X
XX
XX

Page 351 of 471 ends

15.B

Page 1115 of 1962 ends

Policy Number: RLI Insurance Company
PPB 304 02 12 Page 1 of 1
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

RLIPack® FOR PROFESSIONALS

BLANKET ADDITIONAL INSURED ENDORSEMENT
This endorsement modifies insurance provided under the following:

BUSINESSOWNERS COVERAGE FORM - SECTION II – LIABILITY

1. C. WHO IS AN INSURED is amended to include as
an additional insured any person or organization that
you agree in a contract or agreement requiring
insurance to include as an additional insured on this
policy, but only with respect to liability for "bodily
injury", "property damage" or "personal and
advertising injury" caused in whole or in part by you
or those acting on your behalf:
a. In the performance of your ongoing operations;
b. In connection with premises owned by or rented
to you; or
c. In connection with “your work” and included
within the “product-completed operations
hazard”.

2. The insurance provided to the additional insured by
this endorsement is limited as follows:
a. This insurance does not apply on any basis to
any person or organization for which coverage
as an additional insured specifically is added by
another endorsement to this policy.
b. This insurance does not apply to the rendering
of or failure to render any "professional
services".
c. This endorsement does not increase any of the
limits of insurance stated in D. Liability And
Medical Expenses Limits of Insurance.

3. The following is added to SECTION III H.2. Other
Insurance – COMMON POLICY CONDITIONS
(BUT APPLICABLE ONLY TO SECTION II –

LIABILITY)
However, if you specifically agree in a contract or
agreement that the insurance provided to an
additional insured under this policy must apply on a
primary basis, or a primary and non-contributory
basis, this insurance is primary to other insurance
that is available to such additional insured which
covers such additional insured as a named insured,
and we will not share with that other insurance,
provided that:
a. The "bodily injury" or "property damage" for
which coverage is sought occurs after you have
entered into that contract or agreement; or
b. The "personal and advertising injury" for which
coverage is sought arises out of an offense
committed after you have entered into that
contract or agreement.

4. The following is added to SECTION III K. 2.

Transfer of Rights of Recovery Against Others to
Us – COMMON POLICY CONDITIONS (BUT
APPLICABLE TO ONLY TO SECTION II –

LIABILITY)
We waive any rights of recovery we may have
against any person or organization because of
payments we make for "bodily injury", "property
damage" or "personal and advertising injury" arising
out of "your work" performed by you, or on your
behalf, under a contract or agreement with that
person or organization. We waive these rights only
where you have agreed to do so as part of a
contract or agreement with such person or
organization entered into by you before the "bodily
injury" or "property damage" occurs, or the "personal
and advertising injury" offense is committed.

ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED.

PSB0002242
SB&O, Inc.

Page 352 of 471 ends

15.B

Page 1116 of 1962 ends

Policy Number: RLI Insurance Company
Named Insured:

PPA 300 03 13 Page 1 of 5
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

RLIPack® BUSINESS AUTO ENHANCEMENT

SCHEDULE OF COVERAGES ADDRESSED BY THIS ENDORSEMENT
A. Broad Form Named Insured
B. Employees As Insureds
C. Blanket Additional Insured
D. Blanket Waiver Of Subrogation
E. Employee Hired Autos
F. Fellow Employee Coverage
G. Auto Loan Lease Gap Coverage
H. Glass Repair Waiver Of Deductible
I. Personal Effects Coverage
J. Hired Auto Physical Damage Coverage
K. Hired Auto Physical Damage Loss Of Use
L. Hired Car Worldwide Coverage
M. Temporary Transportation Expenses
N. Amended Bodily Injury Definition Mental Anguish
O. Airbag Coverage
P. Amended Insured Contract Definition Railroad Easement Q. Coverage Extensions Audio, Visual And Data Electronic Equipment Not Designed Solely For The Production Of Sound
R. Notice Of And Knowledge Of Occurrence
S. Unintentional Errors Or Omissions
T. Towing Coverage

Page 353 of 471 ends

15.B

Page 1117 of 1962 ends

PPA 300 03 13 Page 2 of 5
This endorsement modifies insurance provided under the following:

BUSINESS AUTO COVERAGE FORM
A. Broad Form Named Insured
The following is added to the SECTION II
COVERED AUTOS LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured Provision:

Any business entity newly acquired or formed by you
during the policy period, provided you own fifty
percent (50%) or more of the business entity and the
business entity is not separately insured for Bus-iness Auto Coverage. Coverage is extended up to a
maximum of one hundred eighty (180) days following
the acquisition or formation of the business entity.

This provision does not apply to any person or
organization for which coverage is excluded by
endorsement.

B. Employees As Insureds
The following is added to the SECTION II
COVERED AUTOS LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured Provision:

Any employee of yours is an insured while using a
covered auto you don't own, hire or borrow in your
business or your personal affairs.

C. Blanket Additional Insured
The following is added to the SECTION II
COVERED AUTOS LIABILITY COVERAGE, Paragraph A.1. Who Is An Insured Provision:

Any person or organization that you are required to
include as an additional insured on this coverage form
in a contract or agreement that is executed by you
before the bodily injury or property damage occurs
is an insured for liability coverage, but only for
damages to which this insurance applies and only to
the extent that person or organization qualifies as an
insured under the Who Is An Insured provision
contained in SECTION II COVERED AUTOS
LIABILITY COVERAGE.

The insurance provided to the additional insured will
be on a primary and non-contributory basis to the
verage if
you are required to do so in a contract or agreement
that is executed by you before the bodily injury or
property damage occurs.

D. Blanket Waiver Of Subrogation
The following is added to the SECTION IV BUSINESS AUTO CONDITIONS, A. Loss Conditions, 5.

Transfer Of Rights Of Recovery Against Others
To Us:

We waive any right of recovery we may have against
any person or organization to the extent required of
you by a contract executed prior to any accident or
loss , provided that the accident or loss arises out
of the operations contemplated by such contract. The
waiver applies only to the person or organization
designated in such contract.

E. Employee Hired Autos

1. The following is added to the SECTION II

COVERED AUTOS LIABILITY COVERAGE,
Paragraph A.1. Who Is An Insured Provision:

An employee of yours is an insured while
operating an auto hired or rented under a
contract or agreement in that employee's name,
with your permission, while performing duties
related to the conduct of your business.

2. Changes In General Conditions:

Paragraph 5.b. of the Other Insurance Condition in the BUSINESS AUTO CONDITIONS is deleted and replaced with the following:
b. For Hired Auto Physical Damage Coverage,
the following are deemed to be covered
autos you own:
(1) Any covered auto you lease, hire, rent
or borrow; and
(2) Any covered auto hired or rented by
your employee under a contract in that
individual employee's name, with your
permission, while performing duties
related to the conduct of your business.

However, any auto that is leased, hired,
rented or borrowed with a driver is not a
covered auto .

F. Fellow Employee Coverage

SECTION II COVERED AUTOS LIABILITY
COVERAGE, Exclusion B.5. does not apply if you
have workers compensation insurance in-force
covering all of your employees.

G. Auto Loan Lease Gap Coverage

SECTION III PHYSICAL DAMAGE COVERAGE,
C. Limit Of Insurance, is amended by the addition of
the following:

In the event of a total loss to a covered auto shown
in the Schedule of Declarations, we will pay any
unpaid amount due on the lease or loan for a covered
auto , less:

1. The amount paid under the PHYSICAL
DAMAGE COVERAGE section of the policy; and

2. Any:
a. Overdue lease/loan payments at the time of
the loss ;

Page 354 of 471 ends

15.B

Page 1118 of 1962 ends

PPA 300 03 13 Page 3 of 5
b. Financial penalties imposed under a lease for
excessive use, abnormal wear and tear or
high mileage.
c. Security deposits not returned by the lessor;
d. Costs for extended warranties, Credit Life
Insurance, Health, Accident or Disability
Insurance purchased with the loan or lease;
and
e. Carry-over balances from previous loans or
leases.

H. Glass Repair Waiver Of Deductible

SECTION III PHYSICAL DAMAGE COVERAGE,
D. Deductible is amended by adding the following:

No deductible for a covered auto will apply to glass
damage if the glass is repaired rather than replaced.

I. Personal Effects Coverage
The following is added to SECTION III PHYSICAL
DAMAGE COVERAGE, A. Coverage, 4. Coverage
Extensions:
c. Personal Effects Coverage
In the event of a total theft loss of your covered
auto we will pay up to $400 for loss to wearing
apparel and other personal effects which are:
(1) Owned by an insured ; and
(2) In or on your covered auto ;
No deductible applies to Personal Effects
Coverage.

J. Hired Auto Physical Damage Coverage
The following is added to SECTION III PHYSICAL
DAMAGE COVERAGE, A. Coverage, 4. Coverage
Extensions:
d. Hired Auto Physical Damage Coverage
If hired autos are covered autos for Liability
Coverage and this policy also provides Physical
Damage Coverage for an owned auto , then the
Physical Damage Coverage is extended to
autos that you hire, rent or borrow subject to the
following:
(1) The most we will pay for loss in any one
accident to a hired, rented or borrowed
auto is the lesser of:
(a) $60,000
(b) The actual cash value of the damaged or
stolen property as of the time of the
loss ; or
(c) The cost of repairing or replacing the
damaged or stolen property with other
property of like kind and quality.
(2) An adjustment for depreciation and physical
condition will be made in the event of a total
loss .
(3) If a repair or replacement results in better
than like kind or quality, we will not pay for the
betterment.
(4) A deductible equal to the highest Physical
Damage deductible applicable to any owned
auto will apply.
(5) This Coverage Extension will not apply to:
(a) Any auto that is hired, rented or
borrowed with a driver; or
(b) Any auto that is hired, rented or
borrowed from your employee .

K. Hired Auto Physical Damage Loss Of Use
The following is added to SECTION III PHYSICAL
DAMAGE COVERAGE, A. Coverage, 4. Coverage
Extensions:
e. We will pay sums which you legally must pay to
the lessor of a covered auto which you have
leased without a driver for thirty (30) days or less
auto ,
provided:
(1) This insurance provides comprehensive,
specified causes of loss or collision covered
on the covered auto ;
(2) The loss of use results from the covered
auto being damaged in an accident while
you are leasing it.

We will pay up to a maximum limit of $1,500 for
this covered extension.

L. Hired Car Worldwide Coverage
The following is added to SECTION II COVERED
AUTOS LIABILITY COVERAGE, A.2. Coverage
Extensions:
f. Hired Car Worldwide Coverage
(1) We will pay all sums an insured legally must
pay as damages because of bodily injury or
property damage to which this insurance
applies, caused by an accident which
occurs outside of the United States of
America, the territories and possessions of
the United States of America, Puerto Rico
and Canada resulting from the maintenance,
or use of any covered auto of the private
passenger type you lease, hire, rent or
borrow without a driver for thirty (30) days or
less.
(2) With respect to any claim made or suit
instituted outside the United States of
America, the territories and possessions of
the United States of America, Puerto Rico,
and Canada:

Page 355 of 471 ends

15.B

Page 1119 of 1962 ends

PPA 300 03 13 Page 4 of 5
(a) You shall undertake the investigation,
settlement and defense of such claims
and suits and keep us advised of all
proceedings and actions.
(b) You will not make any settlement without
our consent.
(c) We will reimburse you:
(i) For the amount of damages because of liability imposed upon you by law on account of bodily injury or
property damage to which this
insurance applies, and
(ii) For all reasonable expenses incurred
with our consent in connection with
the investigation, settlement or
defense of such claims or suits
Reimbursement for expenses will be
part of the Limit of Insurance for
liability coverage shown in the
Business Auto Coverage
Declarations, and not in addition to
such limits.
(3) The limit of Insurance for Liability Coverage
shown in the Business Auto Coverage
Declarations is the most we will reimburse
you for the sum of all damages imposed on
you, as set forth in paragraph 2.c. above, and
all expenses incurred by you arising out of
any single accident or loss
(4) You must maintain the greater of the following primary auto liability insurance limits:
(a) Compulsory admitted insurance with
limits required to be in force to satisfy the
legal requirements of the jurisdiction
where the accident occurs; or
(b) Insurance limits required by law and
issued by a government entity or by an
insurer licensed or permitted by law to do
business in the jurisdiction where the
accident occurs; or
(c) Auto liability insurance limits of at least
$300,000 combined single limit or
$100,000 per person/$300,000 per accident Bodily Injury, $100,000 Property Damage.

If you fail to comply with the above, this
insurance is not invalidated. However, in the
event of a loss , we will pay only to the extent
that we would have been liable had you so
complied.
(5) The insurance provided by this coverage
extension is excess over any other collectible insurance available to you whether on a primary, excess contingent or any other
basis.

M. Temporary Transportation Expenses

SECTION III PHYSICAL DAMAGE COVERAGE,
A.4. Coverage Extensions, subparagraph a.

Transportation Expenses is deleted and replaced
by the following:
a. Transportation Expenses
(1) We will pay up to a maximum of $1,500 for
temporary transportation expense incurred
by you because of Physical Damage to a
covered auto .
(2) We will pay only for those covered autos for
which you carry Comprehensive, Colli-sion or
Specified Case of Loss Coverage.
(3) We will pay only for those expenses incurred
by you during the period of time that begins
twenty-four (24) hours after the covered
loss and ends at the time when the covered
auto can be reasonable repaired or
replaced.
(4) This coverage does not apply while there are
spare or reserve autos available to you for
your operations.

N. Amended Bodily Injury Definition Mental
Anguish
The following is added to SECTION V
DEFINITIONS, Definition C.:

Bodily injury also includes mental anguish, but only
when the mental anguish arises from other bodily
injury, sickness or disease.

O. Airbag Coverage
The following is added to SECTION III PHYSICAL
DAMAGE COVERAGE B. Exclusions 3.a.:

However, this exclusion will not apply to accidental
discharge of an airbag due to mechanical or electrical
breakdown.

P. Amended Insured Contract Definition Railroad
Easement
SECTION V DEFINITIONS paragraph H. Insured
contact is modified as follows:

1. Paragraph H.3. is replaced by the following:

3. Any easement or license agreement.

2. Paragraph H.6.a. is deleted.

Q. Coverage Extensions Audio, Visual And Data
Electronic Equipment Not Designed Solely For
The Production Of Sound
SECTION III PHYSICAL DAMAGE COVERAGE B.

Exclusions, exception paragraph a. to exclusion 4.c.
and 4.d. is deleted and replaced with the following:

Page 356 of 471 ends

15.B

Page 1120 of 1962 ends

PPA 300 03 13 Page 5 of 5
a. Equipment and accessories used with such
equipment, except for tapes, records, discs or
other electronic media device, provided such
equipment is permanently installed in the covered
auto at the time of the loss or is removable
from the housing unit which is permanently
installed in the covered auto at the time of the
loss , and such equipment is designed to be
solely operated by use of the power from the
autos electrical system, in or upon the covered
autos ; or
R. Notice Of And Knowledge Of Occurrence

SECTION IV BUSINESS AUTO CONDITIONS,
A.2. Duties In The Event Of Accident, Claim Suit
Or Loss, subparagraph a. is deleted and replaced
with the following:
a. In the event of accident , claim, suit or loss ,
you must give us or our authorized representative prompt notice of the accident or loss including:
(1) How, when and where the accident or loss
occurred;
(2) The name and address; and
(3) To the extent possible, the names and
addresses of any injured person and
witnesses.

Your duty to give us or our authorized
representative prompt notice of the accident or
loss applies only when the accident or loss is
known to:
(1) You, if you are an individual;
(2) A partner if you are a partnership; or
(3) An executive officer or insurance manager, if
you are a corporation.

S. Unintentional Errors Or Omissions
SECTION IV BUSINESS AUTO CONDITIONS, B.

General Conditions; 2. Concealment Misrepresentation Or Fraud is amended by adding the following:

The unintentional omission of, or unintentional error
in, any information given by you shall not prejudice
your rights under this insurance. However this provision does not affect our right to collect additional premium or exercise our right of cancellation or
nonrenewal.

T. Towing Coverage

SECTION III PHYSICAL DAMAGE COVERAGE,
A.2. Towing, is deleted and replaced by the
following:

2. We will pay up to $750 for towing and labor costs
incurred each time a covered auto is disabled
due to a covered cause of loss. However:
a. All labor must be performed at the place of
disablement; and
b. If the covered auto is a private passenger
type no deductible applies; and
c. If the covered auto is not of the private
passenger type our obligation to pay will be
reduced by a $250 deductible per
disablement.

ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED.

Page 357 of 471 ends

15.B

Page 1121 of 1962 ends

WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 04 03 06 (Ed. 4-84)

©1998 by the Workers’ Compensation Insurance Rating Bureau of California. All rights reserved.

WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT CALIFORNIA We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule.

The additional premium for this endorsement shall be _____% of the California workers’ compensation premium otherwise due on such remuneration.

Schedule
Person or Organization Job Description
This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective Policy No. Endorsement No.

Insured Insurance Company
Countersigned By


Page 358 of 471 ends

15.B

Page 1122 of 1962 ends
Page 359 of 471 ends

15.B

Page 1123 of 1962 ends

Cover Letter
Section I | Experience
Section II | Personnel
Section III | Fee Schedule

Prepared for:

City of Hemet
445 East Florida Avenue
Hemet, CA 92543
Contact: Candace Sunds, Procurement Administrator
Phone: (951) 765-2348
Email: [email protected]
Prepared by:

TKE Engineering, Inc.
2305 Chicago Avenue
Riverside, CA 92507
Contact: Terry Renner, P.E., P.L.S., Q.S.D., Senior Vice President Phone: (951) 680-0440
Email: [email protected]

TABLE OF CONTENTS

Page 360 of 471 ends

15.B

Page 1124 of 1962 ends

Page | 1
Request for Proposal | On-Call Land Survey Services
City of Hemet

COVER LETTER
October 14, 2024
Candace Sunds
Procurement Administrator
City of Hemet
445 East Florida Avenue
Hemet, CA 92543
Subject: Request for Proposal for On-Call Land Surveying Services Dear Ms. Sunds,
Thank you for the opportunity to present TKE Engineering, Inc. (TKE)’s proposal to provide on-call land surveying services to the City of Hemet (City). We have been providing numerous cities with land surveying services over the past 24 years and are highly qualified to perform the survey services necessary. TKE has worked with the City on other past projects and can fully meet the requirements of the City’s Professional Service Agreement. All the elements of the request for proposal have been reviewed and understood, and TKE is enthusiastic about the opportunity to assist the City with these services.

Why should the City choose TKE to provide traffic engineering services? Please consider the following:

A. Firm Identification – TKE, a California Corporation, is a full service, multi-disciplinary consulting corporation located at 2305 Chicago Avenue, Riverside, California 92507 and can be found online at www.tkeengineering.com or reached by phone (951) 680-0440. We have 24 years of experience with providing on-call traffic engineering services to public agencies and are highly qualified to perform the services necessary for project delivery.

B. Key Contact – Terry Renner, P.E., P.L.S., Q.S.D., Principal-In-Charge, is an authorized signatory of the firm and will be TKE’s contact person for the duration of the proposal evaluation and contract. He can be contacted at 2305 Chicago Avenue, Riverside, CA 92507 or reached by telephone at (951) 680-0440 and e-mailed at [email protected].

C. Key Personnel – Mr. Renner will be overseeing and managing the work of our key personnel, each of whom have extensive experience providing Land Survey Services. TKE’s key personnel include Michael Thornton, TKE’s Project Surveyor, who is a registered Land Surveyor and Civil Engineer. He has been currently providing similar services to various cities and has a vast amount of similar experience.

Additional key personnel include Ron Musser, Director of Surveys, Steve Nix, Project Surveyor, and Brett Enscoe, Survey Party Chief. The selected staff that has been assigned to this project between 17 years and 50 years, respectively, of land surveying experience. There will not be any changes in personnel during the contract duration without prior approval by the City.

D. Our Value – TKE’s management team and staff are fundamentally committed to creating value in each task that we perform. As such, we have created a professional culture wherein each member of our staff constantly strives for increased efficiency, ultimately allowing us to provide highly professional services at competitive rates. This culture of constant value creation and increased efficiencies ensures that the services contracted to and provided by TKE will always mean good stewardship of public resources.

E. Responsiveness & Performance – At TKE, we recognize the critical role that dependable land survey services play in the success of projects. We are committed to protecting the City’s liability, ensuring public

Page 361 of 471 ends

15.B

Page 1125 of 1962 ends

Page | 2
Request for Proposal | On-Call Land Survey Services
City of Hemet

COVER LETTER
safety and meeting the City’s schedule goals and objectives for traffic engineering and plan checking services and confirm that all elements of the RFP have been reviewed and understood. We are available for assistance not only during regular business hours but also on weekends and evenings, ensuring flexibility to accommodate emergency survey needs.

F. References – We highly encourage the City to contact our references listed at the end of Section I of our proposal to confirm TKE’s traffic engineering record.

G. Exceptions & Authorization – TKE does not have any exceptions to the RFP and the Professional Service Agreement. TKE’s Senior Vice President, Terry Renner, P.E., P.L.S., Q.S.D. is authorized to sign and bind the proposal.

H. Addenda Acknowledgement – TKE Engineering, Inc. is in receipt of Addenda No. 1 – 2 as of October 7, 2024.

Thank you for your consideration. TKE would very much appreciate the opportunity to provide traffic engineering services. If you have any questions, please call me at (951) 680-0440.

Sincerely,
Terry Renner, P.E., P.L.S., Q.S.D.

Senior Vice President
TKE Engineering, Inc.

Phone: (951) 680-0440
Fax: (951) 680-0490
Website: www.tkeengineering.com

Page 362 of 471 ends

15.B

Page 1126 of 1962 ends

Page | 3
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE
SECTION I | EXPERIENCE

1. MINIMUM PROPOSER

QUALIFICATIONS
Upon notice of award of contract, TKE acknowledges that it will obtain a business license from the City of Hemet prior to the execution of the contract agreement. TKE
acknowledges that it has completed similar services
within the last three years and routinely provides the
services requested in the RFP.

2. FIRM PROFILE
Throughout our history of 24 years serving the Southern California region, we have provided planning, design,
plan checking, construction management and support
services for numerous traffic related projects. We have successfully completed complex and challenging projects for a variety of municipal agencies who have continued
to request that we partner with them in delivering much needed infrastructure to their communities. TKE has
extensive experience with an excellent reputation in
traffic engineering projects.

We are sure that the successful results of our past
performance in the delivery of traffic projects, along with our firm’s proven ability to utilize our experience for a complete and well-engineered project, will provide a
valuable resource to the City.

TKE continues to provide numerous municipalities and
agencies with consulting land survey services and staffing for every facet of development review and public works
projects. TKE recognizes the importance of staffing based on a client’s need and workload. Our flexible support and qualified staff enable our clients to serve their
constituents in a cost effective and efficient manner. TKE proudly provides municipal agencies the following
services on a routine basis:

P ROJECT M ANAGEMENT
TKE provides effective project management services to a variety of clients. TKE’s approach has consistently
allowed our partner agencies to fulfill their missions of delivering the best value for the public’s investment.

TKE’s management approach includes:
• Communication – Communications with
agencies’ staff is another important
TKE Engineering, Inc. | AT A GLANCE
City Surveyor
TKE is the City Surveyor in 6 Cities
Staff Augmentation
TKE currently provides Staff Augmentation in
10 Cities / Counties / Districts
Municipal On-Call Contracts
TKE currently provides Surveying, Map
Checking, Construction Staking, Civil
Engineering Design, and Project Support
services for more than 30 Cities / Counties /
Districts throughout Southern California
Size of Organization
53 Professional Surveyors, Engineers, Traffic
Engineering, Project Managers, Surveyors,
Plan and Map Checkers, Inspectors,
Designers, Construction Managers, and
Support Staff
Location of Office
TKE Engineering, Inc.
2305 Chicago Avenue
Riverside, CA 92507
Years in Business
TKE has conducted business for the past 24
years and has 24 years of experience in
providing Survey services for municipalities
including for Federal and State funded
projects
Company Structure
TKE is a California Corporation founded in
June 2000. TKE has no affiliates or subsidiary
companies. California Business License
Number: 00109901 TKE DIR No. 1000413173
Firm Owners
Michael P. Thornton, P.E., P.L.S., M.S. –
President
Terry Renner, P.E., P.L.S., Q.S.D. –
Senior Vice President
Steven W. Ledbetter, P.E. –
Vice President
County of Riverside
Transportation Department
Point of Contact
Terry Renner, P.E., P.L.S., Q.S.D.

Senior Vice President
2305 Chicago Avenue
Riverside, CA 92507
Phone: (951) 680-0440
Email: [email protected]

Page 363 of 471 ends

15.B

Page 1127 of 1962 ends

Page | 4
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE
component to effective project
management. In addition to the monthly
progress reports, TKE meets with clients as
needed to ensure the projects are proceeding
as anticipated. We document each discussion
or meeting with notes and electronically mail
them to the project team within three days of
the meeting/conference indicating action
items and a schedule for completion of these
items.
• Record Keeping – TKE keeps records in an
organized filing system both in hard copy and
electronic forms. Our record keeping includes
transmittals and comment letters for all
development review, CAD and text files for
topographic survey and base mapping and cut
sheets for all construction staking. This
organized filing system allows TKE to access
records immediately should they be needed.
• Meetings – TKE meets with project
stakeholders as needed. We meet with them
upon request and throughout the course of
plan checking to ensure all comments are
properly addressed and considered in the
project design. All meeting preparation
(agendas, exhibits, slide shows, etc.) will be
prepared by TKE for each meeting. Again,
meetings will be documented. TKE has
provided numerous meetings with other
consultants and developers to adequately
convey the City design requirements.
• Team Meeting – Team meetings include all
parties that have any interest in the project
development. In particular, the City’s
Engineering and Public Works Departments
will be a close working partner with TKE in
determining plan check requirements and
conditions for development and capital
projects.

S URVEYING , M APPING , AND

R IGHT - OF - W AY E NGINEERING
TKE provides survey, mapping, and Land Analysis
services for many projects:
1) Transportation Improvements
2) Land and Real Estate Evaluations
3) Sewer and Water Improvements
4) Tract/Parcel Maps
5) Street Widening
6) Grade Separations
7) Drainage Improvements
8) Parks
9) Basins
10) Buildings
Our Surveying and Mapping experts provide map
checking and surveying on these services:
1) Construction Layout/Staking
2) Construction Quantity Verification
3) Base Mapping
4) Right-Of-Way Engineering
5) Boundary Surveys
6) Construction Surveys
7) Design Surveys
8) Legal Description Surveys
9) Aerial Mapping
10) A.L.T.A. Surveys
11) Topographic Surveys
12) Control Surveys
13) Easement Surveys

P LAN AND M AP C HECKING
TKE has provided numerous municipalities and
agencies throughout Southern California with
consulting survey services and staffing for every facet of Public Works for the past 24 years. In addition, we
have worked on multi-million dollar regional mega
projects for a variety of government agencies and
master planned developments with more than
19,000 homes. TKE recognizes the importance of
staffing based on a client’s need and workload. Our
flexible support and qualified plan and map checking
staff enables our clients to serve their community in
a cost effective and efficient manner.

TKE provides experienced, highly qualified staff with
significant technical expertise and strong public
relations skills for plan and checking. TKE is fully
capable of providing plan and map checking staff on
a full-time, part-time, on-call, interim or project
specific basis. Please refer to our project team
presented below together with our corporate
resumes to verify our team’s technical ability to
deliver these services.

TKE has provided similar services to those requested
here for a number of different agencies. TKE

Page 364 of 471 ends

15.B

Page 1128 of 1962 ends

Page | 5
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE
understands that City’s development and capital
improvement standards were developed to meet the
needs of that particular community. TKE has
developed a thorough understanding of these
standards together with the needs of the
community. For each project that TKE is assigned,
TKE will verify compliance with City
standards. Furthermore, with our extensive
experience, TKE will be able to recommend
improvements to these standards to ensure
expedited project delivery and enhanced public
infrastructure.

3. PROJECT APPROACH
TKE provides turnkey consulting surveying services to
numerous Cities throughout the Southern California. The municipal services provided by our firm include legal
description, plats, lot line adjustments and consolidation preparation and checking, field surveying including both design and construction surveys, utility location and
invert surveys, map checking, monumentation
preservation, related files and representation at
meetings. Each are discussed in the following
paragraphs:

T ASK N O . 1 P ROJECT

M ANAGEMENT AND M EETINGS
TKE will provide support as necessary to coordinate and attend a kickoff meeting, project meetings, field
meetings, as well as prepare corresponding meeting
minutes, progress reports, and project schedules, as
necessary.

D ELIVERABLES :

Meeting Minutes, Progress Reports, and Project
Schedule and Updates
T ASK N O . 2 R ECORDS R ESEARCH
TKE will research, collect and review existing record
drawings and available record information; this shall
include but not be limited to right-of-way data, parcel maps, tract maps, record of survey maps, centerline
control maps, benchmark information, corner records
and other information pertinent to the project.

All record data used to accurately depict the existing
property lines, easements, and right-of-way will be made available to the City for reference.

Upon request by the City, TKE will notify Underground
Service Alert to acquire a complete list of underground utility purveyors. The utility drawings will include existing drawings from the City, and drawings and/or atlas maps
from all private utility companies and/or agencies. We
will send first utility notice letters to all listed utility companies and agencies requesting their data. We will
maintain copies of the letters and correspondence for
future reference. We shall also provide the City with a complete copy of all correspondence with utility
companies and agencies.

D ELIVERABLES :

Survey Record Data (Utility Research Upon Request)
T ASK N O . 3 D ESIGN S URVEYING
TKE will review existing survey data obtained during the Records Research task and after this review, establish
ground control, conduct field surveys, collect field data, and locate existing centerline monuments and property
corners. We propose to use conventional surveying to
locate the existing centerline monumentation and for
preparation of the topographic survey tied to the
California State Plane Coordinate System (NAD83). Our
field survey crew will locate existing street centerline monument utilizing survey control data. The crew will
measure the horizontal angle, horizontal distance, and
vertical elevation difference between each survey
monument. We will complete a traverse for each survey
to ensure closure. Elevations will be tied to existing City or County benchmarks (NAVD88).

TKE will collect all surface culture and prepare cross
sections within the project limits at 50-foot intervals along the proposed alignment collecting all base and top of walls, concrete cross gutters, asphalt concrete swales and flowlines, from right-of-way to right-of-way. The
survey will include all water valves, water meters,
backflow devices, utility covers, fences, walls, gates, curbs, berms, vehicular access gates, corrugated pipes, rip rap systems, perimeter shots on any existing adjacent structures, swales, traffic signs, utility poles and
equipment, street trees, pavement striping, traffic loop detectors. We will utilize standard descriptions while
acquiring topographic data. Data will be collected to
provide 1’ contours for the project area. Results of the survey will be provided to the City in digital and hard copy format.

Page 365 of 471 ends

15.B

Page 1129 of 1962 ends

Page | 6
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE
D ELIVERABLES :

Ground Topography and Data in ASCII Format with
Description Codes
T ASK N O . 4 B ASE

C ONSTRUCTION D RAWINGS
TKE will prepare the base construction drawings on 24”
by 36” sheets with the City’s standard title block and
layering theme using AutoCAD software at drawing scales of 1”=40’, for submittal and approval by the City of the project concept. The base construction drawings will
include a plan view based on records and survey
data. We will add the sheet north arrow, existing
improvements from data collected in the field, property lines with property addresses, public and private right-ofway, easement areas, street centerline, street names, City and State right-of-way lines, Freeway ramp locations and survey data to the plan view portion of the
drawings. The base drawings will include topographic
contours at 1-foot intervals.

Upon request TKE will add all utilities (based on both
assembled records and field data) to the base
construction drawings.

D ELIVERABLES :

Base Construction Drawings in Plan View
T ASK N O . 5 C ONSTRUCTION

S UPPORT AND Q UALITY

A SSURANCE S URVEYS
TKE will provide construction surveying support to the
City of Imperial on an as-needed basis during
construction to verify strict compliance with contract
documents. Generally, this includes setting initial control points with horizontal and vertical values, marking out removal limits established by the construction
documents, setting construction staking at appropriate
intervals and offsets requested by the Contractor,
providing cut sheets to the Contractor, inspector and City staff and checking various construction related items at the direction and request of the on-site inspector.

D ELIVERABLES :

Construction Staking and Cut Sheets
T ASK N O . 6 R IGHT - OF - W AY

D OCUMENTS
TKE will prepare legal descriptions and plats for the public right-of-way dedication, easement dedication, lot line
adjustments, and lot mergers. The legal descriptions and plats will be prepared consistent with the current
provisions of the City to ensure a smooth approval
process.

D ELIVERABLES :

Legals, Plats and Grant/Easement Deeds
T ASK N O . 7 ALTA AND

B OUNDARY S URVEYS
TKE will prepare an ALTA Survey Map and/or boundary
survey in accordance with the American Land Title
Association, American Congress on Surveying & Mapping
and National Society of Professional Surveyors. A copy of the ALTA and/or boundary survey will be submitted to
the City for review and comment. A final ALTA and/or
boundary survey map will be prepared with any changes
or corrections made by the City.

D ELIVERABLES :

ALTA Survey and Boundary Map
T ASK N O . 8 M ONUMENT

P RESERVATION
TKE will recover and tie out all monumentation within the construction limits, provide corner records prior to
commencement on demolition and construction and
replace all disturbed monumentation and upon
completion of final paving file a second set of corner
records.

D ELIVERABLES :

Preliminary and Final Corner Records
T ASK N O . 9 M AP C HECKING
TKE provides experienced, highly qualified staff with
significant technical expertise and strong public relations skills for map checking. TKE is fully capable of providing map checking staff on a full-time, part-time, on-call,
interim or project specific basis.

TKE will utilize the City’s development and capital
improvement standards to meet the needs of that
particular community and develop a thorough
understanding of these standards. For each project that

Page 366 of 471 ends

15.B

Page 1130 of 1962 ends

Page | 7
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE
TKE is assigned, TKE will verify compliance with City, State and Federal standards and the Subdivision and Map Act.

D ELIVERABLES :

Map Review Comments, Conditions of Approval and
Final Maps/Documents

Page 367 of 471 ends

15.B

Page 1131 of 1962 ends

Page | 8
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE

4. PROJECT EXPERIENCE
The following is a list of TKE’s prior project experience involving similar scopes of work, which demonstrates our ability to deliver services of the highest quality to the City of Hemet.

CITY OF HIGHLAND SURVEYING SERVICES
City of Highland, CA

CALIMESA CITY SURVEYING SERVICES
City of Calimesa, CA
Client Contact : Ms. Will Kolbow
Phone Number: (909) 795-9801
Email: [email protected]
Project Cost: $80M
Completion Date: 2013- Present

DESCRIPTION
TKE provides on-call surveying services to the City, including City Surveyor. TKE has managed more than $80 million in public improvements including projects with Federal and State funding sources. While providing these services to the City, TKE represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys, performed construction verification and staking surveys and performed map checking for commercial and residential development projects.

SERVICES
Services included preparation of legal and plat exhibits, easement review and acquisition, field surveying, including construction staking, boundary surveys, topographic surveys, legal description surveys, aerial mapping, ALTA surveys, and control surveys, utility location and invert surveys, performed map checking, and monument preservation.

KEY STAFF
Terry Renner, P.E., P.L.S., Q.S.D, Michael P. Thornton, P.E., P.L.S., Ron Musser, P.L.S., Brett Enscoe, Steve Nix, P.E., P.L.S.

Client Contact : Mr. Carlos Zamano
Phone Number: (909) 864-6861
Email: [email protected]
Project Cost: $40m+
Completion Date: 2013-Present

DESCRIPTION
TKE provides on-call surveying services to the City, including City Surveyor. TKE has managed more than $40 million in public improvements, including projects with Federal and State funding sources. While providing these services to the City, TKE represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys, performed construction verification and staking surveys and performed map checking for commercial and residential development projects.

SERVICES
Services included preparation of legal and plat exhibits, easement review and acquisition, field surveying, including construction staking, boundary surveys, topographic surveys, legal description surveys, aerial mapping, ALTA surveys, and control surveys, utility location and invert surveys, performed map checking, and monument preservation.

KEY STAFF
Terry Renner, P.E., P.L.S., Q.S.D, Michael P. Thornton, P.E., P.L.S., Ron Musser, P.L.S., Brett Enscoe, Steve Nix, P.E., P.L.S.

RELEVANCE TO THE CITY
• On-Call Design Surveying and Topographic
Services
• On-Call Map Checking
• On-Call Right-of-Way Engineering
• On-Call Boundary Surveying
• On-Call Construction Surveying Services

RELEVANCE TO THE CITY
• On-Call Design Surveying and Topographic
Services
• On-Call Map Checking
• On-Call Right-of-Way Engineering
• On-Call Boundary Surveying
• On-Call Construction Surveying Services

Page 368 of 471 ends

15.B

Page 1132 of 1962 ends

Page | 9
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE

ADELANTO CITY SURVEYING SERVICES
City of Adelanto, CA
Client Contact: Mr. Jessie Flores
Phone Number: (760) 246-2300 ext. 11184
Email: [email protected]
Project Cost: $20M+
Completion Date: 2017-Present

DESCRIPTION
TKE provides on-call surveying services to the City, including City Surveyor. TKE has managed more than $20 million in public improvements.

While providing these services to the City, TKE represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys, performed construction verification and staking surveys and performed map checking for commercial and residential development projects.

SERVICES
Services included preparation of legal and plat exhibits, easement review and acquisition, field surveying, including construction staking, boundary surveys, topographic surveys, legal description surveys, aerial mapping, ALTA surveys, and control surveys, utility location and invert surveys, performed map checking, and monument preservation.

KEY STAFF
Terry Renner, P.E., P.L.S., Q.S.D, Michael P. Thornton, P.E., P.L.S., Ron Musser, P.L.S., Brett Enscoe, Steve Nix, P.E., P.L.S., Brian Wolfe, P.E.

WILDOMAR CITY SURVEYING SERVICES
City of Wildomar, CA
Client Contact: Daniel York
Phone Number: (951) 677-7751 ext. 216
Email: [email protected]
Project Cost: $49K
Completion Date: On-Going

DESCRIPTION
TKE provides professional surveying services to the City. TKE is providing surveying services for several small and large tract developments and commercial retail centers within the City. TKE utilizes the City’s online system (Citrix) for access and uploading plan check documents. Services include development project screen checks, response to development community inquiries, determine project impacts, develop conditions of approval, preform plan and map checking for grading, street storm drain landscaping, street lighting, traffic signal, SWPPP, erosion control, and WQMP plans.

SERVICES
Services include design, survey, grading, plan checking, community development inquiries, traffic signal, street lighting erosion control.

KEY STAFF
Michael P. Thornton, P.E., P.L.S., Terry Renner, P.E., P.L.S., Q.S.D., Ron Musser, L.S., Brett Enscoe (Party Chief)

RELEVANCE TO THE CITY
• On-Call Design Surveying and Topographic
Services
• On-Call Map Checking
• On-Call Right-of-Way Engineering
• On-Call Boundary Surveying
• On-Call Construction Surveying Services

RELEVANCE TO THE CITY
• On-Call Design Surveying and Topographic
Services
• On-Call Map Checking
• On-Call Right-of-Way Engineering
• On-Call Boundary Surveying
• On-Call Construction Surveying Services

Page 369 of 471 ends

15.B

Page 1133 of 1962 ends

Page | 10
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION I | EXPERIENCE

5. CLIENT REFERENCES
Please see the Table below for a small, but representative list of agencies who have and continue to request TKE to assist them in delivering valuable projects to their communities. We respectfully request that you verify our qualifications with the listed references.

AGENCY CONTACT NAME PHONE NUMBER/ EMAIL

DATES SERVICES

PROVIDED
(FROM/THROUGH)

CITY OF HIGHLAND
27215 Baseline
Highland, CA 92346
Carlos Zamano
Public Works Director
P: (909) 864-6861
[email protected]
2014-Present

CITY OF CALIMESA
908 Park Avenue
Calimesa, Ca 92320
Will Kolbow
City Manager
P: (909) 795-9801
[email protected]
2012-Present

CITY OF ADELANTO
11600 Air Expressway
Adelanto, CA 92301
Jessie Flores
City Manager
P: (760) 398-3502 ext. 134
[email protected]
2018– Present

CITY OF FONTANA
8353 Sierra Avenue
Fontana, CA 92335
Phil Burum
Deputy City Manager
P: (909) 350-6724
[email protected]
2000-Present

CITY OF WILDOMAR
23873 Clinton Keith
Road, Suite 201
Wildomar, CA 92595
Mr. Daniel York
Public Works Director /
City Engineer
P: (951) 677-7751 Ext. 216
[email protected]
2013 – Present

LAKE ARROWHEAD

COMMUNITY SERVICE

DEPARTMENT
27307 CA-189
Blue Jay, CA 92317
Mr. Catherine Cerri
General Manager
P: (951) 677-7751 Ext. 216
[email protected]
2020 – Present

Page 370 of 471 ends

15.B

Page 1134 of 1962 ends

Page | 11
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL
SECTION II | PERSONNEL

1. KEY PERSONNEL EXPERIENCE
The TKE Team is eager and prepared for an opportunity to support the City of Hemet (City) in accomplishing its goals developed for their various land survey projects and to establish the framework for making informed decisions
regarding the community’s future success. Our team
specializes in developing processes and procedures based on professional expertise and lessons learned, which we implement on all of our projects to ensure successful
delivery on schedule and within budget.

The most important aspect of management will be to
ensure that the City’s interest is protected to the
maximum extent possible. TKE will ensure that public
funds and impact fees are used for the benefit of the
community.

TKE’s key staff assigned to perform the services required are identified and discussed in detail within the following section. As discussed previously, TKE currently maintains a staff of 59 personnel who are highly qualified to assist with any of the required services for this contract and who will be assigned as needed to complete services on
schedule.

TKE has two unique advantages associated with the
experience of TKE’s project team. One benefit of TKE’s
project team is our extremely low internal turnover rate.

As a result of our rigorous interview and testing
procedures, coupled with our extremely high employee
satisfaction rates, TKE staff has years of experience
working together. The close relationships each of our
staff members have with one another provide the City
with an extremely well rounded and experienced team.

As such, TKE’s project team experience directly correlates with TKE’s firm experience described previously.

The second benefit of TKE’s project team is our internal training procedures. TKE has strived to develop
techniques that reach outside the box and develop well
rounded individuals committed to providing high quality, efficient services to meet all of our clients’ needs. TKE trains our staff on every facet of engineering design and construction to provide a level of knowledge that can
identify problems in every phase of a project, from
planning through construction.

It is this commitment to service and diverse array of
offerings that makes us unique and drives our longstanding relationships with our client base.

Understanding that all aspects of land survey are
important to ensure the City’s interests are protected and project schedules are met, our team brings TKE
management level professionals to projects ensuring that every aspect receives full and comprehensive
consideration. It is this personal touch and contact that define our “local service” approach. We consider
ourselves community builders and take ownership of
services requested from TKE, ensuring that our personnel will be allocated on an as needed basis in order to
complete all services on schedule and within specified
budget. TKE is committed to responding to our clients’
needs as they arise.

Below are our proposed team members and their
qualifications and experience:

Terry Renner, P.E., P.L.S., Q.S.D.

Project Manager
California P.E. No. 69984
California P.L.S. No. 9762
Q.S.D. Certification No. 24329
Mr. Renner has over 24 years of
experience as a project manager.

He has worked on and plan checked a variety of public
works engineering projects including development
projects, street improvements, park improvements, bike
trail improvements, drainage improvements, water
system improvements, wastewater system
improvements, and reclaimed water system
improvements projects. Mr. Renner has been responsible
for managing all project aspects including topographic
survey, construction staking, conditions of approval,
agreement preparation, improvement study analysis, and
plan and map checking for development and capital
projects.

Mr. Renner will be assisted by TKE’s project team of
project managers, surveyors, plan and map checkers,
engineers, survey staff, and clerical staff to accomplish all of the tasks required.

Page 371 of 471 ends

15.B

Page 1135 of 1962 ends

Page | 12
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL
Michael Thornton, P.E., P.L.S.,
M.S..

Project Surveyor
California P.E. No. 44226
California L.S. No. 6867
Mr. Thornton will serve as the
Project Surveyor. Mr. Thornton is
TKE’s President and is in charge of
all TKE projects. He has over 35 years of experience in engineering planning, design, land surveying and
construction management for public works projects. He
has worked on a variety of public works engineering
projects. Mr. Thornton is responsible for managing
including funding administration, planning, evaluating, and designing these projects and has provided
construction engineering and surveying services for many of these same projects. He will assist Terry as needed to deliver surveying services.

Ron Musser, P.L.S.

Director of Surveys
California P.L.S. No. 4230
Mr. Musser will serve as the
Director of Surveys. Mr. Musser
has nearly 53 years of experience
in performing field and office
surveying and plan checking
services for public and private projects including roadway and highway projects. He has performed design
topographic surveying and construction staking on TKE’s respective design and construction management projects
and map checking over the past 10 years. In addition, he previously obtained experience working for the county for over 14 years. Mr. Musser has prepared records of survey, parcel maps and tract maps in San Bernardino, Riverside, San Diego, Orange, and Los Angeles Counties. He has
performed boundary, topographic, ALTA, and precise
level surveys as well as Global Positioning Surveys.

Steve Nix, P.E., P.L.S.

Project Surveyor
California P.E. No. 56810
California L.S. No. 8146
Mr. Nix will serve as the Project
Surveyor. Mr. Nix has over 40 years
of experience as a Civil Engineer
and Land Surveyor. He has worked on a variety of
development projects, ranging in size from small to very large, as the municipal agency’s technical review staff. Mr.

Nix has served several cities as it’s resident engineer in other capacities including the City of Chino, City of Chino Hills, City of Montclair, City of Ontario, City of Fontana, City of Riverside, and Chino Basin Municipal Water District in both the public and private sectors. He has served the City of Upland as the Sanitary Sewer Specialist and East Valley Water District as the Director of Engineering and Operations. His experience includes survey, design and
construction management of all types of civil engineering, public works projects including street, and storm drain improvements.

Brett Enscoe
Survey Party Chief
Mr. Enscoe will serve as the Survey
Party Chief. Mr. Enscoe has over
17 years of experience in
performing field and office
surveying services for public and
private projects water projects.

He has performed design topographic surveying and
construction staking on all of TKE’s respective design and construction management projects over the past 17
years. In addition, he has prepared records of survey,
parcel maps and tract maps in San Bernardino, Riverside, San Diego, Orange and Los Angeles Counties. He has
performed boundary, topographic, ALTA, and precise
level surveys as well as Global Positioning Surveys.

Page 372 of 471 ends

15.B

Page 1136 of 1962 ends

Page | 13
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL

2. ORGANIZATIONAL CHART

SUPPORT STAFF
(50+ Members)
Surveyors, Drafters, and Clerical
Project Surveyor
Michael Thornton, P.E.,
P.L.S., M.S.

TKE Engineering, Inc.

Director of Surveys
Ron Musser, P.L.S.

Project Surveyor TKE Engineering, Inc.

Steve Nix, P.E., P.L.S.

TKE Engineering, Inc.

Project Manager
Terry Renner, P.E., P.L.S., Q.S.D.

TKE Engineering, Inc.

Survey Party Chief
Brett Enscoe
TKE Engineering, Inc.

Page 373 of 471 ends

15.B

Page 1137 of 1962 ends

Page | 14
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL

TERRY RENNER,
P.E., P L.S., Q.S.D. PROJECT MANAGER
TKE Engineering, Inc.

EDUCATION
B.S, Civil Engineering, California
State Polytechnic University,
Pomona

CERTIFICATIONS
P.E (CA) 69984
Qualified SWPPP Developer &
Practitioner #24329
P.L.S. (CA) 9762

AFFILIATIONS
Riverside-San Bernardino
Counties Branch, American
Society of Civil Engineers
American Public Works
Association
American Council of Engineering
Companies of California
Mr. Renner is the Senior Vice President of TKE and has 24 years of experience in survey and civil engineering infrastructure projects, including water improvements.

He has provided Resident Engineer management services on numerous projects and has delivered projects for the Fontana, Upland, Rialto, El Monte, Ontario, Moreno Valley, Riverside, Redlands, and Corona. As a project manager, Mr. Renner has been responsible for assisting as City staff, supervising a staff of surveyors, engineers, and drafters, coordinating work between the production team and the client, and for submitting all deliverables in a timely manner. He has successfully delivered a wide variety of complex and challenging projects and is dedicated to ensuring that the plans produced by TKE continue to exceed industry standards.

DETAILED PROJECT EXPERIENCE
• Sierra Widening Project, City of Fontana, CA -Mr. Renner served as project manager. The Sierra Avenue widening improvements project is located in the City of Fontana north of Interstate 10 Freeway between Foothill Boulevard and Baseline Road. The project is approximately 1 mile of widening for the City’s primary north-south arterial street widening the roadway from 4 lanes to 6 lanes. The project includes street widening, raised landscape median, new sewer main installation, traffic signal installation and modifications, traffic signal interconnect and fiber optic cable installation, and extensive utility coordination for water main replacement, Rule 20A and Rule 20B undergrounding work. The project also includes right-of-way acquisition for 76 parcels, traffic analysis, review of construction plans, coordination with project design consultants, construction management and construction staking services.
• Lake Arrowhead Land Surveying Services, City of Lake Arrowhead, CA – Mr.

Renner served as project manager. TKE provides on-call surveying services to the District, including District Surveyor. TKE has managed more than $10 million in public improvements. While providing these services to the District, TKE represented the District with other agencies at numerous meetings, represented engineering with the District’s Board and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys, performed construction verification and staking surveys and performed map checking for commercial and residential development projects.
• Wildomar City Services, City of Wildomar- Mr. Renner served as Project manager. TKE provides professional surveying services to the City. TKE is providing surveying services for several small and large tract developments and commercial retail centers within the City. TKE utilizes the City’s online system (Citrix) for access and uploading plan check documents. Services include development project screen checks, response to development community inquiries, determine project impacts, develop conditions of approval, preform plan and map checking for grading, street storm drain landscaping, street lighting, traffic signal, SWPPP, erosion control, and WQMP plans. residential units and commercial retail centers within the City. Services include closure calculations, development project.

Page 374 of 471 ends

15.B

Page 1138 of 1962 ends

Page | 15
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL

MICHAEL THORNTON,
P.E., P.L.S., M.S.

PROJECT SURVEYOR
TKE Engineering, Inc.

EDUCATION
MS, Civil Engineering, California State
University, Long Beach
BS, Civil Engineering, California State
Polytechnic University, Pomona

CERTIFICATIONS
P.E. (CA): 44226
L.S. (CA): 6867

AFFILIATIONS
American Society of Civil Engineers
American Water Works Association
California Rural Water Association
American Public Works Association
American Council of Engineering
Companies
Mr. Thornton, TKE’s President, is in charge of all TKE projects. He has over 35 years of experience in land surveying, engineering planning, design and construction management for public works projects. He has worked on a variety of public works engineering projects including water system improvements projects. Mr. Thornton has been responsible for managing including funding administration, planning, evaluating, and designing these projects and has provided construction engineering and surveying services for many of these same projects.

DETAILED PROJECT EXPERIENCE
• Adelanto City Surveying Services City of Adelanto Mr. Thornton served as project surveyor. TKE recently completed on-call surveying services to the City, including City Surveyor. TKE has managed more than $15 million in public improvements. While providing these services to the City, TKE represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys.
• City Engineering and Survey Services, City of Hesperia, CA – Mr.

Thornton provides on-call civil engineering services to the City, including City Engineer. He has managed more than $100 million in public improvements. While providing these services to the City, he has represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, managed engineering budgets and project schedules, retained other consultants to prepare improvement design projects, managed funding programs, and various related work. In addition, he has managed major infrastructure development projects.
• City Engineering and Survey Services, City of Calimesa, CA – Mr.

Thornton provided on-call civil engineering services to the City, including City Engineer. He managed more than $20 million in public improvements. While providing these services to the City, Mr. Thornton represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, managed engineering budgets and project schedules, retained other consultants to prepare improvement design projects, managed funding programs, and various related work. In addition, Mr.

Thornton managed major infrastructure development projects. • City of Highland Survey Services, City of Highland, -Mr. Thorton served as project surveyor. TKE provides on-call surveying services to the City, including City Surveyor. TKE managed more than $20 million in public improvements. While providing these services to the City, TKE reviewed maps and conditions of approval, performed boundary and topographic surveys, performed construction verification and staking surveys and performed map checking for commercial and residential development projects.

Page 375 of 471 ends

15.B

Page 1139 of 1962 ends

Page | 16
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL

RON MUSSER,
P.L.S.

DIRECTOR OF SURVEYS
TKE Engineering, Inc.

REGISTRATIONS
L.S. (CA): 4230
Mr. Musser has over 53 years of experience in performing field and office surveying and plan checking services for public and private projects including water projects. When it comes to difficult survey challenges, there is nothing that Ron hasn’t seen. He has performed design topographic surveying and construction staking on TKE’s design and construction management projects and map checking over the past 10 years. In addition, he has prepared records of survey, parcel maps and tract maps in San Bernardino County, Riverside County, San Diego County, Orange County and Los Angeles County. He has performed boundary, topographic, ALTA, and precise level surveys as well as Global Positioning Surveys. Mr. Musser currently provides map checking services to the cities of Calimesa, Upland, Azusa, Pico Rivera and El Monte.

DETAILED PROJECT EXPERIENCE
• On-Call Survey and Map Checking Services, City of Calimesa, CA - Mr.

Musser provides on-call map checking services to the City of Calimesa.

Mr. Musser is providing map checking services for several small and large tract developments, single family residential units and commercial retail centers within the City. Services include closure calculations, development project screen checks, response to development community inquiries, perform map checking for tract maps, parcel maps, lot line adjustments, lot mergers, records of survey, corner records, easement and right-of-way acquisitions.
• On-Call Survey and Map Checking Services, City of Hesperia, CA - Mr.

Musser provides on-call map checking services to the City of Hesperia.

Mr. Musser is providing map checking services for several small and large tract developments, single family residential units and commercial retail centers within the City. Services include closure calculations, development project screen checks, response to development community inquiries, perform map checking for tract maps, parcel maps, lot line adjustments, lot mergers, records of survey, corner records, easement and right-of-way acquisitions.
• Adelanto City Surveying Services City of Adelanto Mr. Musser served as Director of Survey. TKE recently completed on-call surveying services to the City, including City Surveyor. TKE has managed more than $15 million in public improvements. While providing these services to the City, TKE represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys, performed construction verification and staking surveys and performed map checking for commercial and residential development projects.

Page 376 of 471 ends

15.B

Page 1140 of 1962 ends

Page | 17
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL
STEVE NIX, P.E., P.L.S.

PROJECT SURVEYOR
TKE Engineering, Inc.

EDUCATION
Chaffey College

REGISTRATIONS
P.E. License Number 56810 (CA)
L.S. License Number 8146 (CA)

AFFILIATIONS
Riverside-San Bernardino Counties Branch,
American Society of Civil Engineers (ASCE)
American Public Works Association
(APWA)
Mr. Nix, has over 40 years of experience as a Civil Engineer. He has worked on a variety of development projects, ranging in size from small to very large, as the municipal agency’s technical review staff. He has provided development project screen checks, responded to development community inquiries, accepted submittals on behalf of agencies, determined project impacts, developed conditions of approval, presented projects to planning commissions, prepared council agenda reports, performed plan checks, seamlessly executed the entitlement process, as well as many other municipal development services. His experience includes survey, design and construction management of all types of civil engineering projects ranging from single and multi-family residential, commercial and industrial development projects, public works projects including street, sewer, water, storm drain improvements, water wells construction including wellhead treatment, sewage and water pump stations, water reservoirs as well as sewage treatment and transmission.

DETAILED PROJECT EXPERIENCE
• On-Call Plan and Map Checking Services, Various Cities- Mr. Nix has provided on-call plan checking services to several local Southern California Cities. His experience includes providing plan checking services for several small and large tract developments, single family residential units, and commercial retail centers. His services have included development project screen checks, responding to development community inquiries, performing plan checking for grading, street, storm drain, landscaping, street lighting, traffic signal, SWPPP, erosion control, and WQMP plans, as well as conducting all facets of municipal development related services.
• City Engineer, City of Chino Hills- Mr. Nix served in several capacities throughout his decade of services at the City of Chino Hills. As the Assistant City Engineer, he was responsible for review of all aspects of the Land Development process which included entitlement, improvement plan review, and oversight of construction inspection for all projects within the City. He was also responsible for oversight of the Capital Improvement Program including budgeting, design, construction management and inspection services. Upon promotion to City Engineer, under direction of the City Manager, he was responsible for all aspects of operation of the Engineering Department. His oversight included department operating budget, Land Development, Capital Improvement Program, Traffic Engineering as well as liaison to the City Public Works Commission and other outside agency committees. As a Licensed Land Surveyor he also functioned as City Surveyor and signatory to all final maps processed within the City.

Page 377 of 471 ends

15.B

Page 1141 of 1962 ends

Page | 18
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION II | PERSONNEL

BRETT ENSCOE

SURVEYOR PARTY CHIEF
TKE Engineering, Inc.

REGISTRATIONS
Railroad Safety (E-rail Safe)
Scissor Lift Operator
Mr. Enscoe has nearly 17 years of experience in performing field and office surveying services for public and private projects including water projects.

He has performed design topographic surveying and construction staking on all of TKE’s respective design and construction management projects over the past 17 years. In addition, he has prepared records of survey, parcel maps and tract maps in San Bernardino County, Riverside County, San Diego County, Orange County and Los Angeles County. He has performed boundary, topographic, ALTA, and precise level surveys as well as Global Positioning Surveys.

DETAILED PROJECT EXPERIENCE
• Sierra Widening Project, City of Fontana, CA -Mr. Escoe served as surveyor par chief. The Sierra Avenue widening improvements project is located in the City of Fontana north of Interstate 10 Freeway between Foothill Boulevard and Baseline Road. The project is approximately 1 mile of widening for the City’s primary north-south arterial street widening the roadway from 4 lanes to 6 lanes. The project includes street widening, raised landscape median, new sewer main installation, traffic signal installation and modifications, traffic signal interconnect and fiber optic cable installation, and extensive utility coordination for water main replacement, Rule 20A and Rule 20B undergrounding work. The project also includes right-of-way acquisition for 76 parcels, traffic analysis, review of construction plans, coordination with project design consultants, construction management and construction staking services. TKE represents the City with other agencies, represented engineering with the City’s management personnel and other meetings, managed
• On-Call Survey and Map Checking Services, City of Calimesa, CA - Mr.

Enscoe provides on-call survey services to the City of Calimesa. Mr.

Enscoe is providing survey services for several small and large tract developments, single family residential units and commercial retail centers within the City. Services include closure calculations, development project screen checks, response to development community inquiries, perform map checking for tract maps, parcel maps, lot line adjustments, lot mergers, records of survey, corner records, easement and right-of-way acquisitions.
• Adelanto City Surveying Services City of Adelanto Mr. Escoe served as surveyor. TKE recently completed on-call surveying services to the City, including City Surveyor. TKE has managed more than $15 million in public improvements. While providing these services to the City, TKE represented the City with other agencies at numerous meetings, represented engineering with the City’s council and other public meetings, reviewed maps and conditions of approval, performed boundary and topographic surveys.

Page 378 of 471 ends

15.B

Page 1142 of 1962 ends

Page | 19
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION III | FEE SCHEDULE
SECTION III | FEE SCHEDULE
Per the instructions on the request for proposal, a separate cost file will be uploaded onto the City’s PlanetBids online portal.

Page 379 of 471 ends

15.B

Page 1143 of 1962 ends

Page | 20
Request for Proposal | On-Call Land Survey Services
City of Hemet
SECTION III | FEE SCHEDULE
Prepared By:

Page 380 of 471 ends

15.B

Page 1144 of 1962 ends

October 7, 2024
Proposal to Provide
On-Call Land Surveying
951.686.1070 3788 McCray Street
Riverside, CA 92506
@webbassoc
webbassociates.com
Prepared for

Page 381 of 471 ends

15.B

Page 1145 of 1962 ends

3788 McCray Street, Riverside, CA 92506 | P:951.686.1070 | F:951.788.1256 | www.webbassociates.com October 7, 2024
Candace Sunds
Purchasing Department
City of Hemet
445 East Florida Avenue
Hemet, CA 92543
Request for Proposals On-Call Land Surveying Services

Dear Ms. Sunds:

We pride ourselves at Albert A. Webb Associates (WEBB) as a collaborative, capable, and responsive professional consulting firm with the expertise and resources to align with land surveying objectives. With nearly 80 years of experience providing survey services to public sector clients, we have developed a deep understanding of the range of services needed for on-call land surveying.

WEBB is dedicated to providing the utmost quality support to help accomplish the City of Hemet’s goals. We eagerly anticipate the opportunity to engage in discussions about our qualifications and address any inquiries you may have.

We have thoroughly examined the work required in this RFP and are capable of performing quality work to achieve the objectives of the City.

Our proposal emphasizes several key attributes that set us apart:

Expert Teams: Our experienced Land Survey and Mapping team is comprised of seasoned professionals who excel in all facets of land surveying, ensuring precision and reliability in all project aspects. WEBB has an office team of eight Land Surveyors and Technicians along with four Field Survey Crews.

Resource Commitment: WEBB is equipped with cutting-edge technology and vital resources, demonstrating our dedication to timely project completion and successful results.

Client-Centric Focus: Our team is focused on providing precise, accurate, and quality surveys and mapping for the City.

Our Land Survey and Mapping Team will be extensions to City Staff.

Proven Excellence: References from satisfied clients underscore our commitment to efficient and effective service delivery, showcasing our ability to surpass expectations.

Efficiency in Approach: Our experience and scheduling tools allow us to effectively and efficiently assign the correct team members to the project and project completion dates, allowing project efficiency while maintaining high quality standards.

Cover Letter
DIR 1000006209

Page 382 of 471 ends

15.B

Page 1146 of 1962 ends

2 As the Director of Land Surveying and Mapping at WEBB, I will be the direct point-of-contact for all contractual matters, and I personally assure you of our dedication to providing the City of Hemet with top-tier resources and services. Should you need any clarification or have inquiries regarding our proposal, feel free to contact me directly at 951.830.5746, or via email at [email protected].

The cost of printing, mileage, telephone, mailing and other expenses incidental to the performance of the main items of the On-Call engineering and professional consulting services to be rendered are included in the hourly rates schedule of said fee proposal and that there will be no additional charges.

This proposal shall remain valid for a period of not less than 90 days from the date of submittal. All information submitted with the proposal is true and correct.

Sincerely,
Reed Chilton, PE, QSD
Director, Land Surveying and Mapping
[email protected]
951.830.5746
In selecting the WEBB Team you will have a trusted
partner with the technical experience to successfully
complete the City’s projects. WEBB will develop
the right approach to meet the City’s schedule and
project needs!!!
- Reed Chilton, PE, QSD
Director, Land Surveying
and Mapping
Jason Ardery, PE, TE, LLS, CPESC, QSD
Vice President
[email protected]
951.248.4266
As the Director of Land Surveying and Mapping at WEBB, I will be the direct point-of-contact for all contractual matters, and I personally assure you of our dedication to providing the City of Hemet with top-tier resources and services. Should you need any clarification or have inquiries regarding our proposal, feel free to contact me directly at 951.830.5746, or via email at [email protected].

This proposal shall remain valid for a period of not less than 90 days from the date of submittal. All information submitted with the proposal is true and correct.

WEBB is willing ready to enter into a contract under the terms and conditions prescribed by the City of Hemet Professional Services Agreement.

WEBB would like to state that there are no exceptions taken.

Sincerely,
Reed Chilton, PE, QSD
Director, Land Surveying and Mapping
[email protected]
951.830.5746
Jason Ardery, PE, TE, LLS, CPESC, QSD
Vice President
[email protected]
951.248.4266

Page 383 of 471 ends

15.B

Page 1147 of 1962 ends

Section I. Experience..........................................................1 Section II. Personnel ........................................................14 Table of Contents

Page 384 of 471 ends

15.B

Page 1148 of 1962 ends

1 Section I. Experience
Since 1945, Albert A. Webb Associates (WEBB), a California corporation, has consistently provided land surveying and mapping services to public sector clients in California, showcasing exceptional financial stability over the years. With offices in Riverside and Murrieta, we strategically serve the diverse needs of our valued clients.

WEBB is a comprehensive in-house professional services firm with extensive expertise, dedicated to serving public and private sector clients throughout Inland Southern California. Our broad range of services covers project development, land survey and mapping, planning, design, entitlement, funding, permitting, construction management, and inspection. This, coupled with our enduring legacy and strategically located offices, makes WEBB the premier choice for comprehensive land survey and mapping services, ensuring the success of our clients’ projects and fostering continued professional partnerships.

Financial Stability
WEBB is a financially secure California Corporation. We assure our clients that we have the financial resources and organizational capabilities to conduct and complete the required services in a proficient and professional manner.

As a privately held company, WEBB does not typically provide financial information although we can provide certain information upon request.
1945
180
40+
Founding Year
Number of Employees
Licensed Professionals
Firm Specifics
3788 McCray Street
Riverside, CA 92506
951.686.1070
41870 Kalmia Street #160
Murrieta, CA 92562
951.686.1070
Corporate Headquarters
Murrieta
Service Departments
Owner and Principal Parties
• Matthew Webb, PE, TE, LS - President/CEO
• Scott Webb - Senior Vice President
• Steve Webb - Director of Risk Management
• Brian Knoll, PE - Chief Operations Officer
• Kevin W.M. Ferguson - Chief Development Officer
• Scott Hildebrandt, PE - Chief Strategy Officer
• Todd Smith - Chief Financial Officer
• Sam Gershon, RCE - Senior Vice President
• Bruce Davis, PE - Senior Vice President
• Dilesh Sheth, PE, TE - Senior Vice President
• Stephanie Standerfer - Vice President
• Jason Ardery, PE, TE, LLS, CPESC, QSD - Vice President • Joseph Caldwell, PE, CPESC, CPSWQ - Practice Area Leader • Emily Webb, J.D. - Senior Land Use and Entitlement Specialist WEBB does not have any conditions that may impede our ability to complete projects.
• Land Survey and Mapping
• Water Resources
• Construction Management and Inspection
• Land Development Planning and Entitlement
• Land Development Engineering
• Traffic and Transportation Engineering
• Environmental Services
• Landscape Architecture
• Geographic Information Systems

Page 385 of 471 ends

15.B

Page 1149 of 1962 ends

2 Related Experience
Madison Street Improvements
From Avenue 50 to 52
City of Indio
On-Call Land Surveying and
Mapping Services
City of Indio
Client Contact: Tim Wassil, PE, PMP, CCM
Public Works Director
City of Indio
100 Civic Center Mall
Indio, CA 92201
760.391.4018 / [email protected]
Completion Date: August 2019
Client Contact: Tim Wassil, PE, PMP, CCM
Public Works Director
City of Indio
100 Civic Center Mall
Indio, CA 92201
760.391.4018 / [email protected]
Completion Date: Ongoing
WEBB provided land survey and mapping and engineering services for the Madison Street Improvement Project. The project is located between Avenue 50 and Avenue 52, a distance of one mile. This project was a joint effort between the City of Indio and La Quinta. WEBB performed field topographic surveys from street centerline to existing and/or proposed right-of-way line and 50-FT beyond for construction match-up design (such as unimproved roadway access). WEBB performed cross sections at 50-FT intervals and at 25-FT intervals where needed. WEBB established a Class 1, Level 1 benchmark at the intersection of Avenue 52 and Madison. The benchmark conformed to the City of La Quinta’s benchmark network. WEBB obtained encroachment permits when necessary prior to performing these services. WEBB also prepared the necessary surveys and identify existing right-of-way, including property lines, property ownership, easements, assessor parcel numbers, and access control.

WEBB is currently the City of Indio’s On-Call land surveying, mapping, and drafting consultant for capital improvement projects. WEBB’s duties include the surveying of capital improvement projects from preliminary design through construction and performing mapping services. WEBB serves as a reference and resource pertaining to questions regarding land surveying principles, polices, and practices, providing land surveying, mapping, and drafting support for City projects. Specific tasks include, but are not limited to:
• Performing field surveys of control nets and lines, boundary lines, topography, and existing facilities or structures • Preparation of legal descriptions, plats, and right-of-way maps • Preparation of/setting up photogrammetric surveys
• Performing various types of surveying on all types of construction projects, including “as-built” surveys and construction staking
• Performing Quality Assurance work associated with various types of land surveying work • Reviewing, suggesting corrections, and making recommendations on the checking of parcel maps and final subdivision maps

Page 386 of 471 ends

15.B

Page 1150 of 1962 ends

3 On-Call Land Surveying and Mapping Services
Jurupa Community Services District
Client Contact: Scott Lynch
Project Manager
Jurupa Community Services District (JCSD)
11201 Harrel Street, Jurupa Valley, CA 91752
949.292.7454 / [email protected]
Completion Date: Ongoing
WEBB has provided land survey, mapping, and engineering services to Jurupa Community Services District (JCSD) for over 45 years. Since 1986, JCSD has pursued an aggressive waterline replacement program to upgrade existing service by replacing approximately 10,000-LF of 8-inch to 12-inch diameter water distribution mains annually.

WEBB is responsible for the topographic surveys, right-of-way and property line mapping, preparation of legal descriptions and plats, preparation of plans and specifications, utility research, coordination with local fire and transportation departments for approval, construction staking, construction management, and inspection services. WEBB also serves as an extension of JCSD Staff and provides plan check services for the District, which include review of legal descriptions and plats for easements and quitclaims, along with the review of reference documents including Parcel Maps and Final Subdivision Maps. • Provided survey services to JCSD for 45 years
• Plan Check/Review Services as an extension of JCSD Staff • Preparation of plans, surveys, mapping documents, and specifications • Multi-stakeholder/multi-agency coordination

Page 387 of 471 ends

15.B

Page 1151 of 1962 ends

4 Speedway Commerce Center II
Hillwood Investment Properties
Client Contact: Josh Cox
Senior Vice President, Development
Hillwood Investment Properties
36 Discovery, Suite 130, Irvine, CA 92618
909.382.0033 / [email protected]
Completion Date: Ongoing
WEBB, under contract with Hillwood Investment Partners (Hillwood), is both the Engineer and Land Surveyor for the Speedway Commerce Center II Project. Located on approximately 520 acres in the unincorporated area of the County of San Bernardino, this project includes renovating the existing NASCAR Auto Club Speedway, from a 2 mile race track to a 1/2 mile race track, along with the construction of seven new industrial warehouse buildings.

WEBB’s scope of work included:
• Preparation of an ALTA survey for Hillwood to allow them to secure funding for the project - Furnishing an aerial topographic survey and supplemented by field topograpahic survey data • Preparation of a Tentative Parcel Map
• Preparation of various legal descriptions and plats for easements, agreements, and dedications needed for the project, including legal descriptions and plats for Fontana Water Company, SCE, and Metropolitan Water District (MWD) easements prepared per their standards and requirements WEBB has prepared, and is currently processing a Parcel Map with the County of San Bernardino to subdivide the property and dedicate easements for the proposed roads that will serve the project. In addition to the Parcel Map, WEBB is also preparing a Composite Development Plan, very similar to an Environmental Constraint Sheet in the County of Riverside.

While continuing to process the Parcel Map, WEBB field survey crews are actively providing construction staking for the project, starting with demolition limits and utility relocations, and will continue with grading, drainage, utility infrastructure (sewer, water, storm drain, electrical, gas, etc.), traffic signals, curb and gutter, subgrade and base certifications, setting of survey monuments, and filing of a Certificate of Correction (if necessary).

Page 388 of 471 ends

15.B

Page 1152 of 1962 ends

5 Various Capital Improvement Projects - Surveying Services Eastern Municipal Water District
Case Road Sewer Project
• Provided all professional surveying services required during the planning and design of the project • Conducted field survey to locate existing monuments and set aerial targets • Aerial topography coordinated and obtained for project design • Field verification for locations of utilities and appurtenances • Field compared the measured right-of-way distances to record distances to ensure reasonable horizontal control • Performed field surveys to identify potholing locations and determined the elevations of the utilities potholed Enchanted Heights Sewer System
• Provided all professional surveying services required during the planning and design of the project • Performed topographic survey of the gravity sewer and force main alignments, the new Lukens Lift Station, and the Diana Lift Station and furnished a topographical survey with 1-FT contours • Performed a field survey to identify all existing utilities • Performed necessary potholing to locate existing underground utilities • Prepared legal descriptions and plats for all necessary easements and land acquisitions Chamber Recycled Pipeline
• Provided all professional surveying services required during the planning and design of the project • Researched and obtained all available right-of-way and easement documents • Performed utility research and obtained existing atlas map from utility agencies • Conducted field survey to locate existing monuments and set aerial targets • WEBB assisted with converting their existing 4.0 million gallon Chambers Tank from potable to recycled water and constructed an additional recycled water pipeline to facilitate the conversion Contact Contact: James Wyatt, Director, Field Engineering Eastern Muncipal Water District (EMWD)
2270 Trumble Road, Perris, CA 92570
951.928.3777 / [email protected]
Completion Date:

Case Road Sewer: March 2018
Enchanted Heights Sewer System: November 2012
Chamber Recycled Pipeline: September 2008

Page 389 of 471 ends

15.B

Page 1153 of 1962 ends

6 Current On-Call Services Chart
Client / Agency
Services Provided
Civil Design
Planning &
Environmental
Traffic &
Transportation
Construction
Management &
Inspection
Plan Checking
Land Survey &
Mapping
Municipal Finance
Stormwater
Engineering
Grant Writing
GIS Services
Landscape
Architecture
City of Banning X X X X X X X X X
City of Beaumont X
City of Cathedral City X
City of Corona X X
City of Desert Hot Springs X
City of Eastvale X
City of Grand Terrace X X X X
City of Hemet X X
City of Indio X
City of Irvine X
City of Lake Elsinore X
City of Moreno Valley X
City of Palm Springs - Public Works X X
City of Pomona X X X X X X
City of Riverside (Multiple Departments) X X X X
City of Santee X
City of Wildomar X X
Coachella Valley Water District X X X X X X X
County of San Bernardino Special Districts X X X X X X X X X X Eastern Municipal Water District X X X X
Elsinore Valley Municipal Water District X
Imperial County - Public Works Division X X
Jurupa Community Services District X X X X X X X
Riverside County Economic Development Agency X X X X X X X X X Riverside County Flood Control & Water Conservation
District X X X X
Riverside County Transportation Department X X
West Valley Water District X X

Page 390 of 471 ends

15.B

Page 1154 of 1962 ends

7 Project Approach
Management Responsibilities and Procedures
Jason Ardery, PE, TE, LLS, CPESC, QSD, will be the primary point-of-contact with the City as the Vice President.

Jason oversees the scheduling of department resources and will manage the overall scope, schedule, and budget for the City’s Projects. Jason’s extensive experience in Land Survey and Mapping and Land Development projects has trained him to identify potential challenges early on during the project so these can be resolved, minimizing any delay to the project.

Jason will oversee the day-to-day project and technical management which includes:
• Assignment of staff and resources to project specific tasks • Facilitating frequent and consistent communications with the City • Implementing the overall project delivery plan
• Managing the overall scope, schedule, and budget
• Implementing the QA/QC Program
• Overseeing the project controls staff for timely project management reports Michael Johnson, LLS, our Land Survey Practice Area Leader, will provide Technical Oversight, Quality Control, and Quality Assurance for each task. His role will include:
• Providing technical expertise, mentoring, and collaboration with project team members during the preparation of deliverables
• Reviewing deliverables to ensure proper industry standards and practices are followed, WEBB QA/QC procedures are in place, and City standards are requirements are met • Presenting the technical work at meetings and documenting action items and decisions Reed Chilton, PE, QSD, our Director of Land Survey & Mapping, will be responsible for all contractual matters, focusing on resolving any critical contract issues as soon as they are identified. Reed will have the authority to commit firm resources and will support the project manager in managing the overall scope, schedule, and budget. Reed’s experience on large multi-disciplinary projects has trained him to identify and prevent potential delay-causing issues.

Jon Ros, LLS, Carlos Silva, LLS, and Andres Lopez will be managing the overall scope, schedule, and budget as our designated project managers. Jason Ardery, PE, TE, LLS, CPESC, QSD, Michael Johnson, LLS, and Reed Chilton, PE, QSD, can also be project managers if needed.

Project Approach
WEBB has a proven and consistent approach to assure all our services are delivered on time and as economical as possible to provide the best value to the City. WEBB approaches every project as a unique opportunity to demonstrate our expertise and success. Beginning with our comprehensive job request system, project kick-off, and key personnel assignments to strategy and execution, each project is tracked throughout the process and updated on our Liquid Planner scheduling system.

In addition to carrying out essential tasks, adherence to specific aspects is crucial for the success of each project. These six key elements are:

Coordination
• Review scope and budget
• Understanding of the client’s needs and expectations
• Obtain necessary project data
• Confirm project limits and any optional or future areas • Agree on deliverables and timing

Page 391 of 471 ends

15.B

Page 1155 of 1962 ends

8 Planning
• Assign project manager and associates on team
• Review tasks with project team in kick-off meeting
• Discuss project approach and strategy to maximize efficiency • Confirm necessary access and permits or required training • Identity critical points and success factors
Preparation
• Analyze all data files provided or request necessary additional information • Gather all research within project limits and immediate surrounding area • Compute base mapping data and control information for field crew • Prepare field exhibits and data package for export to field data collectors • Schedule field crew and discuss access and any safety issues Execution
• Brief crew on project scope, limits, and any specialized equipment needs • Discuss most efficient strategy and timing
• Confirm necessary research and data files have been transmitted • Crew completes field tasks, noting any exceptions to standard process or data • Crew compiles notes, data, and uploads for processing Quality Assurance and Quality Control
• Every service we provide has a specific process and method we follow • Exceptions to any SOP are coordinated immediately with field and project managers • Data collection is methodical and follows strict parameters for accuracy and consistency • Field notes are reviewed, and data is processed using ALTA/NSPS and NSSDA National Accuracy Standards • All analyses and finished project files are run through our comprehensive check list and review process All our services will be performed under the direction of or by a licensed land surveyor in compliance with applicable laws, rules, regulations, and standards in effect on the date of our agreement. During the entire effort, we will maintain our QA/QC Program to ensure delivery of a reliable product. WEBB’s QA/QC Program is constantly evolving and being updated to address and minimize challenges that arise through the course of similar projects, and to address specific agency requirements.

Delivery
• Electronic files are formatted to client specifications • Deliverable exhibits and data are provided to client after approval by QA/QC review • Additional backup notes, pictures, and support information is also provided upon request • Follow up with client to confirm all data was received and is complete and satisfactory • Client feedback and success factors are noted if we met or exceeded expectations This system has proved to be instrumental in making sure all projects are completed to the best of our ability and nothing is overlooked, unmitigated, or deficient. This also provides measurable statistics to help refine, strategize, and budget for future projects. Every job is an opportunity to learn and develop new skills to keep WEBB ahead of the rest.

Page 392 of 471 ends

15.B

Page 1156 of 1962 ends

9 Scope of Services
WEBB performs a full range of surveying services including all aspects of civil based land surveying. We maintain four Union trained and registered 2-man field crews. However, we can increase our capacity by pulling additional members from the Union or running 1-man crews were safety permits. In-house support capacity can be increased by sharing resources from our large pool of civil engineers available to assist at any time. WEBB has the experience and resources necessary to complete the City’s projects. The scope of services we offer includes, but is not limited to, the following:

ALTA Surveys
WEBB prepares American Land Title Association (ALTA) surveys on a regular basis. For the preparation of an ALTA survey, WEBB will obtain a title report for the property unless one has already been obtained, identify any optional Table “A” requirements that need to be included, research and compile all appropriate reference materials pertaining to the property, including reference Record Maps, Corner Records, Tie Sheets, Vesting Deeds, Right-of-Way Deeds and Easement Documents. WEBB will perform a field survey to locate and verify existing boundary and control monuments based on the legal description provided in the title report, along with surveying the physical topographic features along the boundary perimeter and within the site. An ALTA/ACSM Land Title Survey map will be prepared, adhering to the 2021 Minimum Standard Detail Requirements as adopted by the American Land Title Association and National Society of Professional Surveyors and any Optional Table “A” requirements that are requested.

Field Surveys
WEBB will research record maps and perform the calculations necessary to locate survey monuments to support the project area being surveyed, and corner records will be prepared and filed when necessary. The survey will be based upon California State Plane NAD 83 Horizontal Control and NAVD 88 Vertical Control unless instructed otherwise by City Staff. Once horizontal and vertical control has been established, WEBB’s Land Survey Crews will perform a conventional field survey to recover and establish ground control for the project, as well as conduct a topographic survey of the project limits based on the project needs. Permanent horizontal and vertical control may be established for the project if necessary for future construction. When all data has been collected, processed, analyzed, and adjusted, street centerlines, property lines, right-of-way lines, and/or easement lines will be established based upon the found monumentation. Horizontal and vertical coordinate values will be shown on the survey map. The survey will be prepared by, or under the direct supervision of a state of California licensed land surveyor.

Land Records Research
WEBB utilizes several tools to research and compile existing land records, which include, but is not limited to, County Survey Department GIS Land Records Systems, City Land Record Systems, and County Assessor’s data. WEBB also partners with other business professionals and has access and accounts with TitlePro247, Digital Reel, and First American Data Tree to research and obtain record documents. In many cases it is necessary to obtain title reports for the properties to verify ownership, identify existing easements and encumbrances, and mitigate any risk in property transfers or easement dedications. WEBB works with multiple title companies to obtain the necessary title reports and record documents needed to support the project.

Record Drawing and Utility Research
WEBB has a standardized process for conducting utility research and obtaining record drawings. This process starts with identifying and obtaining the contact information for all the public agencies and utility stakeholders having any jurisdiction or interest within the project limits, with WEBB utilizing Dig Alert for this service. All public agencies and utility stakeholders are then contacted (via mail, email, and/or phone calls) to obtain copies of all available record drawings within the project limits. As part of the standardized process, WEBB tracks each step with each agency until responses are received.

Page 393 of 471 ends

15.B

Page 1157 of 1962 ends

10 Boundary Surveys
A Boundary Survey serves as the foundation of most projects, and as such, WEBB prepares boundary surveys on a regular basis. WEBB will obtain a title report for the property unless one has already been obtained, and research and compile all appropriate reference materials pertaining to the property, including reference Record Maps, Corner Records, Tie Sheets, Vesting Deeds, Right-of-Way Deeds and Easement Documents. WEBB will perform a field survey to locate and verify existing boundary and control monuments based on the legal description provided in the title report, using North American Datum of 1983 (NAD83) State Plan Coordinates for horizontal control unless other specific project requirements are necessary. Boundary analysis and resolution will be performed by office staff along with the retracement and plotting of any easements and right-of-way or records on the subject property. A final Boundary Survey map will be prepared, signed, and stamped by a licensed land surveyor.

Construction Staking
Working with both public and private sector clients, WEBB has a long history of providing construction staking services throughout Southern California. From Caltrans Interchange Improvements to Wastewater Treatment Plants, there are not many projects that WEBB does not have construction staking experience with.

All WEBB projects are setup in the office by experienced staff, allowing any errors or discrepancies to be caught and resolved ahead of time prior to having field crews being on-site. This allows our field crews to be more efficient and productive while they are on-site.

Grade sheets are provided through our automated process from the data exported from our controllers. The grade sheets are then reviewed in the office for quality assurance prior to being distributed to the contractor, inspector, and/ or City as directed.

Legal Descriptions & Plats
WEBB has a great amount of experience in the preparation of legal descriptions and plats, adhering to agency standards and requirements. WEBB has experience in preparing legal descriptions and plats adhering to Caltrans, SCE, MWD, and many other agency requirements.

Legal descriptions and plats prepared for the City will follow industry standards and agency requirements, along with any project specific needs. Unless otherwise required, legal descriptions and plats will be prepared utilizing existing record data.

Monument Preservation, Records of Survey, & Corner Records WEBB will conduct the necessary office research and field survey work as part of our field survey, for boundary control and mapping as needed by the City. Existing survey monuments will be recovered and/or set, when necessary, and Corner Record(s) filed in accordance with Sections 8795(d), 8771, and 8773, of the Professional Land Surveyors Act.

A Record of Survey may be prepared, in accordance with Sections 8762, 8764, and 8765 of the Professional Land Surveyor’s Act based on the specific situation.

Monument Inspections
WEBB has prepared and recorded many Parcel Maps, Tract Maps, and Records of Surveys, has set an enormous amount of monuments, and prepared ties sheets and filed Corner Records, giving WEBB the experience and expertise to conduct monument inspections on behalf of the City, addressing project requirements and understanding City expectations.

Page 394 of 471 ends

15.B

Page 1158 of 1962 ends

11 Right-of-Way Maps
WEBB will meet with City Staff and the design team to discuss the project’s purpose, mapping limits, specific planimetry to be mapped, preferred scale, timeline, and any special requirements for the Right-of-Way Map.

WEBB will research and compile existing recorded maps, property records, and Right-of-Way records from the City, County, and other relevant sources, which may include, but not be limited to:
• Assessor’s Parcel Maps
• Records of Survey
• Corner Records
• Tie Sheets
• Field Surveyor Notes
• Parcel/Tract Maps
• Caltrans Maps
• Railroad Maps
• Title Reports (will work with a Title company to provide) • Previous ROW Dedications
• Easement Documents
Once research is completed, WEBB will conduct a field survey, as necessary to collect accurate ground measurements, and locate right-of-way boundaries, physical features, and any other relevant on-the-ground information that may not be readily available from existing records.

Utilizing the research information with the field survey data, WEBB will prepare a base map showing existing parcel lines, property ownership, street centerlines, and existing right-of-way lines, with references to the source documentation used for their determination.

WEBB will prepare a Right-of-Way Map, using the requested base map level/layers, and depending on the project needs, show any proposed right-of-way or easement needs, abandonments, vacations, quitclaims, etc., along with the existing lines from the base map.

Review/Plan Check Services
WEBB regularly reviews and provides comments on survey documents for our clients, most recently for the Jurupa Community Services District and the City of Ontario.

WEBB will review documents provided for accuracy, and cross check against any improvement plans proposed to ensure the correct areas are being described/included in the survey document. Documents will be reviewed for conformity with industry standards and agency requirements, and any inconsistencies and/or errors will be noted.

Volume Calculations
WEBB’s experience as both a Land Surveying and Engineering firm allows for seamless communication and expectations from the field survey crews to the office staff, allowing the collection of pertinent data that is useful and expected for the project needs.

Depending on the size and scope of the project, WEBB, with the assistance of sub-consultants, has the ability to conduct field surveys, photogrammetric surveys, and/or Lidar scans for projects which can be used to generate digital terrain models which can be compared and used for volume calculations based on the same surveyed area at different moments in time, as specified.

Page 395 of 471 ends

15.B

Page 1159 of 1962 ends

12 Page 396 of 471

15.B

Page 1160 of 1962 ends

13 WEBB has the required expertise and provides services in land survey and mapping, geographic information system, construction management/inspection, landscape architecture, traffic and transportation, stormwater engineering, municipal engineering, water resources, land development engineering, and entitlement processing. Our diverse resources will aid the City in achieving its goals and meeting the needs of the council, commissions, and citizens.

The City will reap the benefits of our team’s approach to client service. Client service is our number one goal. WEBB’s reputation for superior quality work, integrity, and long-standing client relationships is a direct result of our industry proven capabilities and experience. We are proud of the name WEBB as it has become synonymous with experience and customer service. We encourage the City to contact our references to discuss any questions you may have regarding the continuity of our team, responsiveness to our client needs, efficiency of our team, and quality of our work.

Agency Contact Person Contact Information
City of Indio
100 Civic Center Mall
Indio, CA 92201
Timothy Wassil, PE, PMP, CCM,
Public Works Director
760.391.4018
[email protected]
Jurupa Community Services District
11201 Harrel Street
Jurupa Valley, CA 91752
Scott Lynch
Project Manager
949.292.7454
[email protected]
Eastern Municipal Water District
2270 Trumble Road
Perris, CA 92572
James Wyatt
Director, Field Engineering
951.928.3777
[email protected]
Crestline Lake Arrowhead Water Agency
P.O. Box 3880
Crestline, CA 92325
Jennifer Spindler
General Manager
909.338.1779
[email protected]
Shea Properties
130 Vantis
Suite 200
Aliso Viejo, CA 92656
Landon Browning
Vice President of Acquisitions
415.806.4705
landon.browning@
sheaproperties.com
Hillwood Investment Properties
901 Via Piemonte
Suite 175
Ontario, CA 91764
Josh Cox
Vice President Development
909.380.7156
[email protected]
Coachella Valley Association of Governments
73-710 Fred Waring Drive
Suite 200
Palm Desert, CA 92260
Randy Bowman
Transportation Program Manager
760-346-1127
[email protected]
KPRS Construction Services
451 Lambert Rd.

Suite 200
Brea, CA 92821
Sean Wisner
Senior Project Manager
714.381.2432
[email protected]
Client Refernce List

Page 397 of 471 ends

15.B

Page 1161 of 1962 ends

14 Your assigned WEBB Team will consist of senior-level professionals who will perform the required tasks for this contract.

By taking this hands-on approach, an experienced professional will always have in-depth and intimate knowledge of each project. This improves overall project management, reduces the opportunity for costly mistakes and delays, and allows our staff to provide very effective and efficient service to the City. Key personnel will be available to the extent proposed for the duration of the project and WEBB acknowledges that no person designated as “key” to the project shall be removed or replaced without written consent of the City.

Project Team
VICE PRESIDENT/PRINCIPAL-INCHARGE
Jason Ardery, PE, TE, LLS, CPESC, QSD
C 71508 / TE 2618 / LLS 9329

DIRECTOR
Reed Chilton, PE, QSD
C 83827
Jon Ros, LLS
LLS 8723
Professional Land Surveyor
(Project Manager)
Carlos Silva, LLS
LLS 9552
Professional Land Surveyor
(Project Manager)
Construction Staking
Andres Lopez
Manager of Field Operations
(Project Manager)
Four Survey Crew
In-House

PRACTICE AREA LEADER/TECHNICAL
EXPERT
Michael Johnson, LLS
LLS 7673
Jordan Moretti
Survey Technician
Jon Valcourt
Survey Technician
Riley Skarvka
Survey Technician
Annette Trussell
Project Administrator
Survey and Mapping
Sub-Consultants
Inland Aerial Surveys, Inc. (IAS)
Aerial Survey
OZone Reality Capture
3D Laser scanning, Photogrammetry, and
Drone-based Imaging
Organizational Chart
Section II. Personnel

Page 398 of 471 ends

15.B

Page 1162 of 1962 ends

15 Jason Ardery, PE, TE, LLS, CPESC, QSD, QSP
Vice President
As an experienced civil engineer and land surveyor, Jason brings a wealth of experience in planning, designing, and managing complex projects from conception to completion. With 19 years of experience in the field, Jason has established a reputation for delivering high-quality results that meet or exceed client expectations.

As a Vice President and having served as the Director of Land Development at WEBB for more than 10 years, Jason led a team of well experienced and diversified Project Managers, Engineers, Designers, Planners, Landscape Architects, and administrative staff in residential, commercial, and industrial development projects.

Jason is very familiar with the entitlement process having been involved with and overseen the approval of many entitlement applications, including Change of Zones, General Plan Amendments, Specific Plans, Specific Plan Amendments, Tentative Maps, Site Plans, Air Port Land Use compliance, and Williamson Act & Agricultural Preserve cancellations. Jason also served on the City of Eastvale General Plan Advisory Committee for the development of the first General Plan for the City of Eastvale.

Jason has extensive experience in site development, grading and drainage design, utility design, roadway design, and construction administration. Jason’s expertise includes designing and managing projects ranging from small site developments to large infrastructure improvement projects. Jason has a deep understanding of civil engineering and surveying principles, which allows for efficient and cost-effective design solutions.

With extensive experience in land development, Jason also has expertise in boundary surveys, ALTA surveys, topographic surveys, construction staking, mapping, and legal descriptions. Jason has a keen eye for detail and accuracy, which ensures that surveying projects are completed with precision and professionalism.

Jason is a licensed civil engineer, traffic engineer, land surveyor, Certified Professional in Erosion and Sediment Control (CPESC), a Qualified SWPPP Developer (QSD) and Qualified SWPPP Practitioner (QSP), a small Unmanned Aircraft System (sUAS) Remote Pilot, and holds a Bachelor of Science degree in Civil Engineering from California State Polytechnic University, Pomona. Jason is also a member of professional organizations such as the American Society of Civil Engineers and serves as the President of his current HOA.

With Jason’s extensive knowledge and experience in civil engineering and land surveying, Jason is well-equipped to provide clients with the highest level of service and expertise.

REGISTRATIONS
Registered Civil Engineer C 71508 (CA)
Registered Traffic Engineer 2618 (CA)
Licensed Land Surveyor 9329 (CA)

EDUCATION
BS, Civil Engineering
California State Polytechnic University,
Pomona

CERTIFICATIONS
Certified Professional in Erosion and
Sediment Control (CPESC) 6561
Qualified SWPPP Developer/Practitioner
(QSD/QSP) 20935

AFFILIATIONS
American Society of Civil Engineers (ASCE)
Building Industry Association (BIA)

Page 399 of 471 ends

15.B

Page 1163 of 1962 ends

16 Jason Ardery, PE, TE, LLS, CPESC, QSD, QSP
Vice President
Riverside Transmission Reliability Project - Project involved SCE and the City of Riverside for the Overhead Powerline Project through private properties. WEBB provided engineering support for the private property owners and analyzed the impact to the properties based on the proposed overhead powerline alignment which included review of SCE easement restrictions/requirements, existing and proposed easements, determination of useable development areas, property access, net and gross acreage calculations, development, and preparation of various exhibits.

McCune Flamingo Dairy - Project involves OC Flood Control and the Army Corps. of Engineers and is related to the construction of a proposed dike on private property. WEBB is providing engineering support for the private property owner. Jason’s role has been limited to providing engineering expertise as well as history of the design and development that occurred on the private property.

City of Santa Ava versus Rim Portofino - Jason’s involvement was related to the preparation and review of a boundary survey of the subject property, which included review of the Litigation Guarantee, deeds and easement documents, research of existing maps, documents and survey records, and the plotting of existing property lines and easements from record data.

Caltrans 42B4956 versus Aim High - This project is for the Construction of State Highway 138 and State Highway 18 Bypass Connection. WEBB is providing engineering and surveying support for Caltrans. Jason’s role included the review of the development potential and potential impacts to the property in the before and after condition, which included property areas, land use and zoning, setbacks, property access, grading, drainage, floodplain, and utilities.

Eastvale Civic Center, City of Eastvale - Jason served as Project Manager for the WEBB Team. WEBB utilized the research and investigation data provided by the utility companies and public agencies during the entitlement of the Polopolus site to identify, locate, and accurately layout all underground improvements, easements, centerline, rightof-way, and private property lines. This research included utility maps and as-built plans, as provided by the utility companies and public agencies. Utilizing this information, along with field survey data collected by WEBB, WEBB prepared street improvement plans, storm drain plans, waterline plans, signing and striping plans, and streetlight plans for the proposed extension of Schleisman Road, including the intersection expansion of Schleisman Road and Hamner Avenue, and the design of a roundabout. WEBB also coordinated the project with the development of Hamner Place by Lewis Retail Centers, as well as with several subconsultants, including geotechnical engineering, a pothole consultant, electrical consultant, and landscape architect to provide a complete project for the City. WEBB continues to provide support services to City Staff as construction is nearing completion.

Goodman Commerce Center, City of Eastvale - Jason served as Project Manager for this project. The Goodman Commerce Center at Eastvale Specific Plan is a commercial/industrial business park located in the north portion of the City of Eastvale. The park included water quality basins, a walking trail, benches, LED light bollards, low water use plants, plant buffer zones, and a decorative rock. WEBB executed landscape architecture, entitlement, final engineering, and mapping of Business Park Parcels 3 and 4. The project included a General Plan Amendment to change the land use designation from High Density Residential to Light Industrial, Business Park, and Commercial Retail.

Page 400 of 471 ends

15.B

Page 1164 of 1962 ends

17 Reed Chilton, PE, QSD, is Director of WEBB’s Construction Management and Inspection and Land Survey and Mapping Department. Reed has worked on a variety of private and public projects and has established a strong foundation in the engineering and construction management profession. His project experience includes sewer lines, drainage facilities, water lines, recycled water lines, wastewater treatment facilities, dry utilities, street improvements, street lighting, traffic signals, and landscaping. Specifically, his involvement with these projects includes preparation of specifications and bid documents, contract management and administration, permitting, submittal and RFI review and coordination, leading meetings, field investigations, project documentation, review and approval of change orders and pay estimates, project close-out, and managing day-to-day needs for owners and contractors.

REGISTRATIONS
Registered Civil Engineer C 83827 (CA)

EDUCATION
BS, Civil Engineering
Brigham Young University
MS, Civil Engineering
Brigham Young University

CERTIFICATIONS/TRAINING
Qualified SWPPP Developer (QSD) C83827
Reed Chilton, PE, QSD
Director - Construction Management and Inspection and Land Survey and Mapping
Construction Manager for the $25M Wastewater Treatment Plant, City of Imperial - WEBB performed Construction Management, Inspection, and Engineering Support Services for the City’s $25 million WWTP Upgrade Project. This project includes construction of a new MBR treatment system including MBR Basins, waste-activated sludge pumps, blowers, air compressors, permeate storage tank, and non-potable water pumps. A pre-engineered metal building was installed for the MBRS system which included a monorail bridge crane, office spaces, and lab room. A dewatering system with screw conveyors was also installed inside a preengineered metal building. Electrical improvements include a new transformer, main breaker, automatic transfer switch, and Emergency Power Generator. Site improvements include yard piping, paving, and rock installation. The project also includes modifications to existing facilities, shut-downs, and tie-ins to the active wastewater treatment plan.

Construction Manager of a $1.3M Headworks Upgrade, City of Imperial - Improvements included headworks modifications, installation of fine screens, micro screens, splitter box, piping, shade structure, and electrical modifications.

Construction Manager for the $3.1M John J. Benoit Detention Center - Project included off-site storm drain, street, and traffic signal improvement for the County of Riverside Economic Development Agency. Storm drain improvements consisted of excavation/grading of the retention basin of approximately 18,040-CY, installation of 3,660-LF of RCP ranging in sizes from 18-inch to 48-inch, and construction of 161- LF of curb inlet catch basins. Installation of RCP required multiple water relocations and modifications, including vertical offsets ranging in sizes from 1-inch to 2-inch services and 6-inch to 12-inch mainline along with sewer lateral modifications.

Coordination with the following agencies was required: Indio Water Authority, Valley Sanitary District, City of Indio Public Works, and Imperial Irrigation District. Reed also coordinated soils testing with local business owners.

Page 401 of 471 ends

15.B

Page 1165 of 1962 ends

18 Downtown Sewer Replacement Project, Elsinore Valley Municipal Water District - Reed is the Project Manager and is providing construction management and observation services for the Downtown Sewer Replacement Project, FY 2023. This project consists of three separate areas of sewer line installation, abandonment, and replacement of aging sewer infrastructure in the City of Lake Elsinore. WEBB is providing construction management and observation service for all three areas.

The improvements include the following:
• Installation of 3,734-LF of new 8-inch PVC (2,224-LF of SDR- 35 and 1,470-LF of C-900 DR-18) sewer main and a point repair of 40-LF of SDR-35 8-inch sewer, and 19 new sewer manholes - House lateral reconnections are also required
• Street improvement work coordinated with the City of Lake Elsinore inspector • We have included the option to have WEBB provide inspection for the City • Sewer bypasses will be required during mainline installation including tie-ins to the existing homes and manhole construction activities
Highway 74 Sewer Extension, Elsinore Valley Municipal Water District - Reed is the Project Manager for the Highway 74 Sewer Extension Project. The project involves the installation of approximately 12,500-LF of 16-inch diameter sewer along Highway 74 from Wasson Canyon Road east to the District’s service area boundary at Ethanac Road, including a micro-tunneling operation on Wassan Canyon Road.

Wastewater Treatment Plant MBR Replacement, City of Beaumont - Reed is the Construction Manager for the City’s Wastewater Treatment Plant which was recently upgraded and expanded to a capacity of 6-MGD. As part of the upgrade project, several facilities were removed and replaced with more advanced systems that required significantly less space and has resulted in more exposed dirt areas. There are also graded slopes that need to be protected from erosion and runoff going into the stormwater system. The City would also like to improve the functionality, safety, and aesthetics of the Plant entrance by reconfiguring the gate on-site as well as upgrading the landscaping to include an entry monument.

The final component of this project is to construct a permanent receiving station for vactor truck discharges. The Plant currently receives vactor discharge at a temporary facility.

WRF1 Replacement of Centrifuge, Aeration Basin, and Digester Lid, City of Corona - Reed is the Project Manager for this project which consists of installing a new centrifuge and belt conveyor at the City’s WRF#1 site. The project includes site demolition and removal of existing structural, mechanical, and electrical components to accommodate the new centrifuge and conveyor facilities. A new drain line will be installed from the centrifuges to the oxidation ditch scum return lines.

Bain Waterline Replacement, Jurupa Community Services District - Reed is the Project Manager providing construction management services for the Bain Waterline Replacement Project. The project consists of:
• 3,900-LF of 8-inch diameter C909 PVC water main
• 140-LF of 12-inch diameter C909 PVC water main
• 655-LF of 8-inch CML/CMC water main
• 575-LF of 12-inch diameter CML/CMC water main
• 500-LF of 42-inch diameter jack and bore steel pipe casing under SR-60 Freeway • Refurbishment of fire hydrants
• New water services and meter boxes
• Paving and street restoration
Reed Chilton, PE, QSD
Director, Construction Management and Inspection and Land Survey and Mapping

Page 402 of 471 ends

15.B

Page 1166 of 1962 ends

19 SCE TRTP Segment 8, Chino Hills - Michael served as the Land Survey Lead of the TRTP SEG 8 Chino Hills Project. WEBB’s Scope of Work for this project was to provide the civil engineering work associated with undergrounding of the TRTP segment 8 transmission lines. The project was very complex and involved grading in hilly terrain, between houses, through parks, a golf course and across many public roads. The project included many environmental constraints which WEBB incorporated into project plans and specifications by working closely with SCE’s environmental team and consultant.

The work included designing construction access roads along the

3.5 mile duct banks between two proposed transition stations generally located from just east of Pipeline Avenue to just west of Canon Lane in the City of Chino Hills. The purpose of the construction access road (with a varied width between

11.5-FT to 33.5-FT) was to facilitate excavation of duct banks trenches and installation of conduits. WEBB designed erosion control plans and measures associated with construction access roads to ensure no erosion or sediment flowed into the natural drainages and streams. WEBB also designed the restoration and the permanent access road plans to be implemented right after the completion of duct banks construction to restore the ground surface as close to the pre-construction condition as possible.

Michael Johnson, LLS, is the Practice Area Leader of WEBB’s Land Survey & Mapping Department. Michael has years of experience in all aspects of surveying from initial project coordination and research, performing survey data adjustments and analysis, to overseeing and providing construction staking through final as-built and ALTA surveys.

Michael trained and supervised several field crews including technical office and support staff. From entitlement to field survey and construction to delivery of a completed product, Michael has the knowledge and experience to provide the entire range of services any municipal, private development, or construction company has come to expect. As part of the private and public sector of development, Michael gained experience with subdivisions, retail centers, commercial distribution centers, pipelines, tank site and reservoir projects, mass grading and hillside slope projects, hospitals, schools, training facilities for fire and police, highways, channels, parking structures, and many others.

Michael is responsible for providing technical support, survey analysis, overseeing field work and management for specific projects, and field data processing and adjustments, among many other duties. He provides his expertise and broad range of skills for solutions to complex and large scale projects.

REGISTRATIONS
Licensed Land Surveyor 7673 (CA)

EDUCATION
AS, Mathematics,
Riverside Community College

AFFILIATIONS
California Land Surveyors Association
(CLSA)
Michael E. Johnson, LLS
Land Survey Practice Area Leader

Page 403 of 471 ends

15.B

Page 1167 of 1962 ends

20 Archibald Avenue and Schleisman Road Ultimate Intersection Improvements, Eastvale – Michael served as the Land Survey Lead for the Archibald Avenue and Schleisman Road Intersection Improvements to the ultimate design configuration per the General Plan. Archibald Avenue and Schleisman Road are both Urban Arterial roads with 152-FT ultimate right-of-way width typical sections. The design included expanded intersection widths to allow for right-turn pockets, dual left-turn lanes in all directions, and raised medians. A new traffic signal and signing and striping was also designed and installed per Riverside County Standards. Existing SCE Poles along the west side of Archibald Avenue also had to be relocated to allow for the widening of Archibald Avenue. This was done through a Joint Use Agreement (JUA) between the County of Riverside and SCE since SCE had prior rights along this section of Archibald Avenue. Michael was responsible for the coordination of plans between three developers (Lewis, Richland, & Capital Pacific Homes), processing of plans through the County of Riverside, and obtaining approvals for construction.

Case Road Sewer, Eastern Municipal Water District - Michael served as Land Surveyor on the WEBB Team that prepared the project feasibility study, which analyzed two different options. The first was the Beaumont option which expands and upgrades treatment at the City’s WWTP. For this option, three different WWTP configurations were evaluated.

In addition, options were explored to dispose of waste brine from the advanced treatment system. The second option was to consolidate treatment with YVWD and deliver all wastewater flow there. For each option detailed cost estimates were developed taking into account capital cost and O&M costs. In the end the City Council selected the Beaumont option. The preliminary design includes the preparation of 20%-30% plans for both the WWTP expansion as well as a 23-mile brine disposal pipeline connecting to the IEBL in San Bernardino.

Dillon Road Water Main Replacement, Coachella Valley Water District - Michael provided Land Survey and Mapping Services for the WEBB Team and was responsible for designing a domestic water transmission main system providing a reliable water supply to the District’s service area located northeast of Sun City Palm Desert in Riverside County near the community of Indio Hills. Currently, this County service area, Improvement District 18, is an isolated pressure zone located near the end of the Sky Valley Domestic Water System, which has limited supply capacity between BS 04701 and R 4711.

The approximately 4.2 mile alignment travels from BS 04701, located near the intersection of Dillon Road and Western Avenue to R 4711 which is 800-FT north of the intersection of 30th Avenue and Sunny Rock Road. Construction of the pipeline occurred on the north shoulder of Dillon Road to match the Phase 1 project.

Enchanted Heights Sewer System, Eastern Municipal Water District - Michael provided Land Survey and Mapping Services for the Enchanted Heights Sewer System Infrastructures Project. In order to provide a sewer collection system for 542 dwelling units located within the 170 acre Enchanted Heights area of Riverside County and City of Perris, WEBB prepared final engineering plans and specifications for a gravity collection system. This system included approximately 23,000-LF of 8-inch gravity pipe, 3,000-LF of 6-inch force main, and a new sanitary sewer lift station (Luckens). As part of this project, WEBB also upgraded the District’s existing Diana Lift Station by installing a new emergency generator, upgrade of MCC site access improvements, asphalt paving, and security fencing. WEBB completed an evaluation of three potential site locations to provide the District flexibility in handling affected property owners and acquiring the right-of-way for the proposed lift station.

Michael Johnson, LLS
Land Survey Practice Area Leader

Page 404 of 471 ends

15.B

Page 1168 of 1962 ends

21 Jon Ros, LLS
Land Surveyor
Jon Ros, LLS, is a Professional Land Surveyor with WEBB’s Land Survey and Mapping Department. He is a project surveyor with years of land surveying experience. His responsibilities include field to finish data management utilizing various CAD platforms, analysis of survey data, preparation of land title descriptions and exhibits, right-of-way engineering for Caltrans, the preparation of maps (subdivision), title documents, reports, earthwork calculation, project exhibits, and survey crew preparation and scheduling.

Jon has worked on a variety of projects including ALTAs, the subdivision of land, property acquisition, and the preparation of records of survey. He is proficient in the use of several CAD platforms such as Terramodel, AutoCAD Civil 3D, and MicroStation & InRoads.

REGISTRATIONS
Licensed Land Surveyor 8723 (CA)

EDUCATION
AS, Survey and Mapping Science
California State Polytechnic University,
Pomona
BS, Electrical Engineering
California State Polytechnic University,
Pomona

AFFILIATIONS
Geographical Information Systems (GIS)
California Land Surveyors Association
(CLSA)
Riverside/San Bernardino Local CLSA
Chapter
Washington Street Turn Lanes, City of La Quinta - WEBB prepared Plans, Specifications, and Cost Estimates (PS&E), and contract bid documents for the Washington Street Dual Left Turn at Avenue 48 and Washington Street Dedicated right-turn at Eisenhower Drive to increase traffic capacity in this area of La Quinta. These projects required preparation of street improvement, traffic signal modification, and signing and striping plans. In addition, the project also required utility coordination and relocation, removal and replacement of landscaping, and preparation of legals and plats for additional right-of-way.

Palm Canyon Crosswalk, City of Palm Springs - As the Community Engineer for this 3,600-acre private community that serves a population of approximately 14,000 residents, WEBB is responsible for planning, design, construction management, and development of the traffic management program for all associated roadways and trails. This community has over 50 miles of roadways and trails. The trail system is a combination of Class I and Class II trails that wind throughout the community similarly to the Whitewater Channel Bike Trail. This system is used by the residents of Canyon Lake to access the amenities throughout the community including over ten parks, 18-hole golf course, equestrian center, community lodge, beaches, and backbone roads. WEBB provides construction management, inspection, civil engineering, design, and environmental permitting services for all facilities including the Association’s 15 parks and recreation facilities.

Madison Street Improvement Project, City of Indio - WEBB provided the alignment study, Project Design Report, environmental, utility relocation, right-of-way acquisition, roundabout feasibility, preparation of Plans, Specifications, and Cost Estimates (PS&E), and multi-agency coordination efforts. Madison Street from Avenue 50 to Avenue 52 is an approximately one mile long arterial roadway located within the City of Indio and the City of La Quinta. The typical street section of Madison Street does not currently conform to both cities’ General Plan Circulation Elements. Jon helped both cities reach an agreement on a modified typical street section. The project will be constructed in two phases. Phase I will install three lanes and Phase II will install an additional two lanes. Phase I of the project has a very aggressive schedule because of the pavement condition and music festival schedule on the polo grounds, which are located at the east boundary. Jon is managing both cities and other agencies involved to move the project forward aggressively and meet the schedule.

Page 405 of 471 ends

15.B

Page 1169 of 1962 ends

22 Andres Lopez
Manager of Field Operations
Andres Lopez is Manager of Field Operations with WEBB’s Land Surveying and Mapping Department. With extensive experience and expertise in the field, Andres plays a pivotal role in coordinating and scheduling in-house survey requests from engineering and general contractors.

In his role, Andres demonstrates exceptional organizational abilities, ensuring that projects are executed smoothly and efficiently. He is responsible for overseeing the entire process, from initial coordination to final delivery. His keen attention to detail and strong communication skills enable him to effectively collaborate with clients, ensuring their needs are met and expectations exceeded. One of Andres’ key responsibilities is the preparation and review of construction calculations and cut sheets. He meticulously analyzes project requirements and employs his technical proficiency to generate accurate and comprehensive documentation, laying the foundation for successful construction operations.

Andres excels in preparing base mapping and alignment surveys, as well as conducting topographic surveys. Through the utilization of advanced surveying techniques and equipment, he collects precise data to create highly detailed and reliable survey reports. His expertise extends to post-processing GPS data using Trimble Business Center, ensuring accuracy and integrity in positioning information. Additionally, Andres specializes in creating control networks, establishing the foundation for geospatial referencing and spatial accuracy within projects. His proficiency in control network creation contributes to the overall success of surveying and mapping operations, providing essential reference points for subsequent data collection and analysis.

EDUCATION
AS, Drafting and Design
ITT Technical Institute

AFFILIATIONS
California Land Surveyors Association (CLSA)
Carlos Silva, LLS
Professional Land Surveyor
Carlos Silva, LLS, is a Professional Land Surveyor with WEBB’s Land Survey and Mapping Department. He is a project surveyor with 20 years of experience in all aspects of surveying in both field and office. His responsibilities include right-of-way mapping, record of surveys, legal descriptions and exhibits, and ALTA surveys.

REGISTRATIONS
Licensed Land Surveyor 9552 (CA)

EDUCATION
Certified LS Survey Party Chief Operating Engineers Local 12 San Bernardino Community College

AFFILIATIONS
California Land Surveyors Association (CLSA)
Riverside/San Bernardino Local CLSA Chapter

Page 406 of 471 ends

15.B

Page 1170 of 1962 ends

23 Jordan Moretti
Mapping Specialist
Jordan Moretti is a Mapping Specialist with WEBB’s Land Survey and Mapping Department. Jordan offers clients nearly ten years of land surveying and mapping experience, priding himself on client satisfaction. He has been involved in field and office work under the supervision of several senior licensed land surveyors, and has assisted on large and small construction projects throughout Inland Southern California.

EDUCATION
Riverside Community College (RCC),
Riverside, California
Santiago Canyon College, Land Surveying
Course Work

AFFILIATIONS
California Land Surveyors Association (CLSA)
Jon Valcourt
Survey Technician
Jon Valcourt is a Survey Technician with WEBB’s Land Survey and Mapping Department. Jon possesses an impressive command of cutting-edge surveying equipment and software, facilitating the effective collection, analysis, and interpretation of the data. He has conducted topographic and boundary surveys as well as construction staking. Jon’s commitment to maintaining surveying standards, combined with his problem-solving skills, and ability to foster close collaborations with engineers and land planners, makes him an invaluable asset to any surveying team.

Riley Skvarca
Survey Technician
Riley Skvarca is a Survey Technician with WEBB’s Land Survey and Mapping Department. Riley has played a pivotal role in projects, contributing his technical prowess and attention to detail. He has conducted land surveys, CAD designs, soils analysis, quality control, and stake out. Riley’s proficiency extends to utilizing state-of-the-art surveying equipment and software, enabling him to collect, analyze, and interpret data effectively. Riley’s commitment to maintaining surveying standards, combined with his problem-solving skills, makes him an invaluable asset to any surveying team.

CERTIFICATIONS
Surveyor Engineering Apprenticeship
Certificate

Page 407 of 471 ends

15.B

Page 1171 of 1962 ends

24 DEREK C. HOOD, PLS
President / Principal
INLAND AERIAL SURVEYS, INC.

Registrations - Credentials
California Professional Land Surveyor #6799
Nevada Professional Land Surveyor #12461
California Community College Teaching Credential #251137 Subject: Architectural, Engineering and Related Technologies.

Certified Party Chief – International Union of the Operating Engineers 1998 – President of the California Land Surveyors Association, Riverside-San Bernardino Chapter.

BIO
Current position: President / Principal of Inland Aerial Surveys, Inc.

Mr. Hood will be the Project Manager overseeing the acquisition of aerial photography, photogrammetric mapping & digital imaging operations for this project.

Mr. Hood began his Land Surveying career in 1979. Past duties have included, but not limited to, managing the surveying and mapping departments for large Civil Engineering firms in the Inland Empire. Surveying services performed range from performing boundary establishment, control networks – established from conventional and GPS surveying techniques, Construction, Topographic mapping prepared from Aerial Photogrammetry, LIDAR and conventional Land Surveying techniques. He has worked on projects for both the public and private sectors.

In 2000, Mr. Hood became Principal and President of Inland Aerial Surveys, Inc. and during this time has been specializing in photogrammetry.

Mr. Hood holds a Community College Teaching Credential for the subjects of Architectural, Engineering and Related Technologies. He has also served as an instructor for the Southern California Surveyors Apprenticeship Committee. Classes instructed were on the Party Chief level ranging from coordinate geometry, land surveying practices, Aerial Photogrammetry and conventional topography, boundary establishment and public lands.

Mr. Hood also has experience as a Survey Party Chief, Mapping compiler (utilizing Analog, Analytical and Soft-Copy photogrammetric mapping equipment), as well as several hundred hours as an Aerial Camera Operator.

Mr. Hood with his diverse background in Land Surveying as well in Photogrammetry gives him a unique insight for any project.

Inland Aerial Surveys, Inc.

Aerial Survey
Inland Aerial Surveys, Inc. (IAS) will provide aerial survey services for the City. IAS has been providing photogrammetry, aerial mapping, and geo-spatial services to a continually expanding number of clients in both the private and public sector.

IAS offers all photogrammetric services while specializing in the compilation of aerial topographic digital data. Through the use of technologically advanced, precision equipment and capabilities, IAS has established a prominent reputation in the industry by providing an unequaled level of quality. An excellent reputation has been established by very close quality control of all phases. WEBB has worked with IAS for more than 45 years.

OZone Reality Capture
3D Laser scanning, Photogrammetry, and Drone-based Imaging OZone Reality Capture (OZone) provides spatial data acquisition and visualization solutions, utilizing cutting-edge technologies such as 3D laser scanning, photogrammetry, and drone-based imaging. Their dedicated team specializes in delivering precise and comprehensive data for various industries, empowering businesses to optimize operations and make informed decisions. Committed to pushing the boundaries of what’s possible, they remain at the forefront of technological advancements, providing unparalleled accuracy and efficiency, from assisting architects with design visualization to supporting urban planners in creating sustainable cities.

DIR 1000017861
DIR PW-LR-1000993500
Sub-consultants

Page 408 of 471 ends

15.B

Page 1172 of 1962 ends

00091740.2

PROFESSIONAL SERVICES AGREEMENT

BY AND BETWEEN

THE CITY OF HEMET

A CALIFORNIA MUNICIPAL CORPORATION
AND
NV5, INC.

A CALIFORNIA CORPORATION
AGREEMENT # 2025-047

Page 409 of 471 ends

15.B

Page 1173 of 1962 ends

00091740.2
Signature Page

PROFESSIONAL SERVICES AGREEMENT

FOR ON-CALL LAND SURVEYING SERVICES
BETWEEN THE CITY OF HEMET AND NV5, INC.

THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is made and entered into this 13th day of November, 2024 (“Effective Date”), by and between the CITY OF HEMET (“City”), a California municipal corporation and NV5, Inc., a California corporation (“Consultant”). For the purposes of this Agreement City and Consultant are sometimes hereinafter referred to as “Party” and hereinafter collectively referred to as the “Parties.”

RECITALS

1. City has sought by request for proposals the performance of the On-Call Land Surveying Services defined and described particularly in Section 2, “Scope of Services and Schedule of Performance” of this Agreement.

2. Consultant was selected by City to perform those services.

3. Consultant was selected by City on the basis of Consultant’s demonstrated competence and the professional qualifications necessary for the satisfactory performance of the services required.

4. City has authority to enter into this Agreement and the City Manager has authority to execute this Agreement.

5. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Section 2 “Scope of Services” of this Agreement and desire that the terms of that performance be as particularly defined and described herein.

OPERATIVE PROVISIONS
NOW, THEREFORE, for and in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the Parties agree as follows:

SECTION 1. TERM OF AGREEMENT
Subject to the provisions of Section 21 "Termination of Agreement" of this Agreement, the Term of this Agreement is through November 12, 2027, commencing on the Effective Date, unless otherwise extended by written agreement of the Parties. City shall be granted two (2) one (1) year options to extend the Term of the Agreement. City shall exercise option(s) by written notice to Contractor no less than (30) days prior to the end of the existing Term.

Page 410 of 471 ends

15.B

Page 1174 of 1962 ends

00091740.2
Signature Page
(a) The City Manager may, in his or her sole discretion, unilaterally exercise an option to extend the Agreement on a month-to-month basis following expiration on the same terms and conditions, including compensation as set forth in Section 4 “Compensation.” (b) Consultant acknowledges that the Agreement term may extend over multiple City fiscal years, and that the work and compensation under this Agreement is contingent on the City Council appropriating funding for and authorizing such work and compensation for those fiscal years. This Agreement may be terminated by the City Manager at the end of a fiscal year when sufficient funding is not appropriated and authorized for the subsequent fiscal year. City is not obligated to pay Consultant for any amounts not duly appropriated and authorized by the City Council.

SECTION 2. SCOPE OF SERVICES
Subject to this Agreement, all addendums and exhibits attached and incorporated hereto, Consultant agrees to perform the services and tasks set forth in Exhibit “A,” “Scope of Services” (hereinafter, the “Services”), and the City agrees to retain and does hereby retain Consultant for the Services.

SECTION 3. ADDITIONAL SERVICES
Consultant shall not be compensated for any work rendered in connection with its performance of this Agreement that is in addition to or outside of the Services unless such additional services are authorized in advance and in writing in accordance with Section 25 “Administration and Implementation” or Section 27 “Amendment” of this Agreement. If and when such additional work is authorized, such additional work shall be deemed to be part of the Services.

SECTION 4. COMPENSATION
(a) Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in Exhibit “B” “Compensation” and made a part of this Agreement by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed the amount agreed to and set forth in the scope of work for which a purchase order has been issued. The amount shall also never exceed the appropriated budget for these professional services in any City Fiscal Year, unless additional compensation is approved in writing in accordance with Section 25 “Administration and Implementation” or Section 27 “Amendment” of this Agreement. (b) All City vendors and consultants receiving new contracts, contract renewals, or contract extensions must sign up to receive electronic payments through the City's Automated Clearing House (ACH) payments service/provider. Electronic payments are processed biweekly and are safe and secure. To enroll in ACH electronic payments contact

Page 411 of 471 ends

15.B

Page 1175 of 1962 ends

00091740.2
Signature Page
[email protected].
(c) Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant. (d) If this Agreement is extended pursuant to Section 1 “Term of Agreement,” the City shall pay the same rates specified in Exhibit “B” “Compensation.” SECTION 5. METHOD OF PAYMENT AND INVOICING
(a) Payment shall be made in accordance with City’s usual accounting procedures upon receipt and approval of an itemized invoice setting forth the services performed. The invoices shall be emailed to [email protected]. Under no circumstances shall the total amount paid to Consultant under this Agreement exceed the City Manager’s authority without approval by the City Council.
(b) Consultant shall submit within 30 days of the end of each month a complete and accurate written itemized invoice for services performed and/or goods provided. The invoice must be in a format approved by City. In order to receive payment, Consultant shall submit to City an itemized invoice, on a monthly basis, for services performed pursuant to this Agreement. Each itemized invoice shall identify at the top of the first page, the Not to Exceed Amount (as set by Section 4(a) above), the total amount billed to date, the services rendered during the billing period, and the amount due for the statement invoice for which reimbursement is sought in the statement invoice. The invoice shall detail charges by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub consultant contracts. Sub consultant charges shall be detailed by the following categories: labor, travel, materials, equipment and supplies. If the compensation set forth in Section 4(a) and Exhibit “B” include payment of labor on an hourly basis (as opposed to labor and materials being paid as a lump sum), the labor category in each invoice shall include detailed descriptions of tasks performed and the amount of time incurred for or allocated to that task. City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. In the event that no charges or expenses are disputed, the invoice shall be approved and paid according to the terms set forth in subsection (c). In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission.
(c) Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, City will use its best efforts to cause Consultant to be paid within forty-five (45) days of receipt of Consultant’s correct and undisputed invoice. (d) The Parties estimate that performance of this Agreement will be accomplished without an increase in the Not to Exceed Amount. Consultant shall notify the City in writing

Page 412 of 471 ends

15.B

Page 1176 of 1962 ends

00091740.2
Signature Page
whenever it has reason to believe that the costs the Consultant expects to incur under this Agreement in the following sixty (60) days, when added to all costs previously incurred, will exceed eighty percent (80%) of the Not to Exceed Amount specified herein. As part of the notification, the Consultant shall provide the City with a revised estimate of the total cost of performing this Agreement.

SECTION 6. INSPECTION AND FINAL ACCEPTANCE
City may inspect and accept or reject any of Consultant’s work under this Agreement, either during performance or when completed. City shall reject or finally accept Consultant’s work within sixty (60) days after submitted to City. City shall reject work by a timely written explanation, otherwise, Consultant’s work shall be deemed to have been accepted. City’s acceptance shall be conclusive as to such work except with respect to latent defects, fraud, and such gross mistakes as amount to fraud. Acceptance of any of Consultant’s work by City shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to, Section 17 “Indemnification” and Section 18 “Insurance.” SECTION 7. OWNERSHIP OF DOCUMENTS
All original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files and other documents prepared, developed, or discovered by Consultant in the course of providing the Services pursuant to this Agreement shall become the sole property of City and may be used, reused or otherwise disposed of by City without the permission of the Consultant. Upon completion, expiration, or termination of this Agreement, Consultant shall turn over to City all such original maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files, and other documents.

If and to the extent that City utilizes for any purpose not related to this Agreement any maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files, or other documents prepared, developed, or discovered by Consultant in the course of providing the Services pursuant to this Agreement, Consultant’s guarantees and warranties in Section 11 “Standard of Performance” of this Agreement shall not extend to such use of the maps, models, designs, drawings, photographs, studies, surveys, reports, data, notes, computer files, files or other documents.

SECTION 8. INTELLECTUAL PROPERTY RIGHTS ASSIGNMENT
For no additional compensation, Consultant hereby assigns to City all of Consultant’s rights, title, and interest in and to the content of all deliverable materials created by Consultant or its employees, agents, or sub consultants, including copyrights, in connection with the Services performed under this Agreement. Consultant shall promptly execute and deliver and shall cause its employees, agents, and sub consultants to promptly execute and deliver, upon request by the City or any of its successors or assigns at any time and without further compensation of any kind, any power of attorney, assignment, application for copyright, patent, trademark or other

Page 413 of 471 ends
← All documents from this meeting