17 1502 SF Construct AC Pavement 7-6.12 $
18 2 EA Relocate Existing Sign and
Signpost
7-6.13 $
19 1 EA Furnish and Install Sign Post 7-6.14 $
20 10 EA Furnish and Install Signs 7-6.14 $
21 1 EA Install City Furnished RRFB
Model System on Existing Post
7-6.15 $
22 1 EA Install City Furnished RRFB
Model System on New Post
7-6.15 $
23 0 SF Construct 4’ Ribbon Gutter 7-6.16 $
24 232 LF 4” ADA Parking Striping 7-6.17 $
25 3 EA International Symbol of Access
Pavement Marking
7-6.17 $
26 2 EA “No Parking” Pavement Marking 7-6.17 $
27 20 LF Yield Line Pavement Marking 7-6.17 $
28 120 SF Crosswalk Pavement Marking
(Continental)
7-6.17 $
29 3EA Furnish and Install Wheel Stop 7-6.18 $
30 12 EA Adjust Water Valve to Grade 7-6.19 $
31 1 EA Adjust Backflow System to
Grade
7-6.19 $
32 24,566 SF Construct Stabilized
Decomposed Granite
7-6.20 $
33 346 LF Install Flush Redwood Header 7-6.21 $
34 3,435 LF Install Concealed Redwood
Header
7-6.21 $
35 2 EA Salvage and Reinstall Existing
Memorial Bench
7-6.22 $
36 2 EA Install City Furnished Memorial
Bench
7-6.22 $
37 2 EA Salvage and Reinstall Existing
Trash Can
7-6.22 $
38 2 EA Install City Furnished Fitness
Equipment Set
7-6.22 $
39 160 SF Construct Cast in Place Concrete
Paving for Benches
7-6.23 $
$16.29 24,467.58 $500.00 1,000.00 $760.00 760.00 $350.00 3,500.00 $1,930.00 1,930.00 $2,625.00 2,625.00 - -
$3.60 835.20
$303.00 909.00 $300.00 600.00 $55.00 1,100.00 $25.00 3,000.00 $303.00 909.00 $500.00 6,000.00 $2,500.00 2,500.00 $10.46 256,960.36 $8.14 2,816.44 $7.60 26,106.00 $3,500.00 7,000.00 $2,000.00 4,000.00 $760.00 1,520.00
$17,500.00 35,000.00
$50.00 8,000.00

Page 1572 of 2548 ends

(Total Bid in Figures) ______
(Total Bid in Words)
Contractor Name: ______
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of

__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.

Contractor Signature: __________________________________________ Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
40 12 EA Install 48” Box Tree 7-6.24 $
41 14 EA Install 15 Gallon Shrub 7-6.24 $
42 392 EA Install 5 Gallon Shrub 7-6.24 $
43 22 EA Install 1 Gallon Shrub 7-6.24 $
44 2,254 SF Install Sod 7-6.24 $
45 12,324 SF Install Hydroseed 7-6.24 $
46 1 LS Adjust and Install New Existing
Irrigation System
7-6.25 $
47 4 EA Remove Existing Wheel Stops 7-6.4
48 1 EA Adjust Existing Water Fountain
to Grade
7-6.19

49 18 CF Unclassified Excavation 7-6.4
50 915 SF Provide Soil and Fill 2” Below
Top of Curb
7-6.24

$2,500.00 30,000.00 $600.00 8,400.00 $5.00 1,960.00
$3.95 86.90 $6.50 14,651.00 $0.85 10,475.40 $75,000.00 75,000.00 $350.00 $1,400.00 $3,850.00 $3,850.00 $200.00 $3,600.00 $3.23 $2,955.45 $843,216.29 Eight hundred fourty three thousand, two hundred and sixteen dollar and twenty nine cents SDC Engineering Inc. $84, 321.62 ---------------------------------------- $125,000.00 $125,000.00

Page 1573 of 2548 ends
Page 1574 of 2548 ends
Page 1575 of 2548 ends
Page 1576 of 2548 ends
Page 1577 of 2548 ends
Page 1578 of 2548 ends

26 D. BIDDER'S ASSURANCE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
FROM:

Name of Bidder:

Business Address:

Telephone No:

TO:

Members of the City Council
c/o City Hall
City of Hermosa Beach, California
Members of the City Council:

Pursuant to your published Notice Inviting Bids for: CIP NO. 502 GREENBELT PEDESTRIAN TRAIL, CIP NO. 604 CITY WIDE ADA IMPROVEMENTS, AND CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares that he/she has carefully examined the location of the proposed work; that he/she has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders and hereby proposes to furnish all materials, machinery, tools, labor, and services and do all the work necessary to complete the project in accordance with said Plans and Specifications and other Contract Documents at the item prices on the bidding schedule.

BY: TITLE:

SDC Engineeering Inc.
24881 Alicia Pkwy Ste E #340,

Laguna Hills, CA 92653

(949) 280-2863 Danny Cancino President

Page 1579 of 2548 ends

27 E. BIDDER'S DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
It is understood and agreed that:

1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, Warranty Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.

2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.

3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.

4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.

The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.

5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other Bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding.

6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the Owner after evaluation of the bids as submitted. The undersigned agrees that the Owner shall recover or retain as liquidated damages an amount equal to the difference between the low bid and amount of the bid of the Bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest Bidder in accordance with the provisions of the Public Contract Code section 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.

Page 1580 of 2548 ends

28 7. This bid will not be withdrawn within a period of ninety (90) days after the date of its proper opening by the City.

8. The undersigned Bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.

Respectfully submitted,
Contractor's Business Name Contractor Signature Title
Business Address: Street By Title
City State Zip Contractor's License No. and
Classification
Business Phone Number Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the Bidder, whose address must be given: if it is made by a firm, it must be signed in the co-partnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.

SDC Engineering Inc. President
24881 Alicia Pkwy Ste E #340,

Laguna Hills, CA 92653 Danny Cancino President 986959 (949) 280-2863 5/17/2024 Danny Cancino President 25341 Barents Laguna Hills, CA 92653 (562) 922-4420

Page 1581 of 2548 ends

29 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.

We agree specifically:

1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.

2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.

3. To take affirmative steps to hire minority employees within the company.

FIRM

TITLE OF PERSON SIGNING

SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:

SDC Engineering Inc. President 5/17/2024

Page 1582 of 2548 ends

30 G. CERTIFICATION OF PRINCIPAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.) Signature:

Name:

Title:

Name of Company:

Danny Cancino President SDC Engineering Inc.

Page 1583 of 2548 ends

31 H. DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned, a duly authorized representative of the Contractor, certifies and declares that:

1. The undersigned Contractor is aware of Section 1771.1 and 1777.7 of the California Labor Code, which prohibit a Contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The undersigned Contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The undersigned Contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a Contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a Contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.”
“(b) Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract, and any public money that may have been paid to a debarred subcontractor by a Contractor on the project shall be returned to the awarding body. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”

4. The undersigned Contractor has investigated the eligibility of each and every subcontractor the undersigned Contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, at (place of execution),
California.

Signature:

Name:

Title:

Name of Company:

Danny Cancino President SDC Engineering Inc. May 17th Laguna Hills

Page 1584 of 2548 ends

33 J. REFERENCES OF WORK
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Provide names, addresses, phone numbers and email addresses for at least three public agencies for which Bidder has performed similar work within the past five years.

All contact information must be current.

1. _______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________

2.______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
RKA Consulting Group - 398 Lemon Creek Drive, Suite E Walnut, CA 91789 Tony Estes - (909) 373-5437 Tri City Mental Health Garden Repair - To demo and rebuild a garden including garden equipment

and sheds. $599,944.36 07/31/2024 $612,156.91 4
05/21/2024 RKA Consulting Group - 398 Lemon Creek Drive, Suite E Walnut, CA 91789 Tony Estes - (909) 373-5437 Building a Trail on Lemon ave for the City of Bradbury $181,597.77 $216,350.73 1/18/2024 01/11/2024

Page 1585 of 2548 ends

34 Number of Change Orders ____________

3.________________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________
For additional References, please add separate sheets.

NAME OF BIDDER

SIGNATURE OF BIDDER DATE
3 City of Placentia - 401 E Chapman Ave. Placentia, CA 92870 Raquel Garcia - (714) 993-8128 La Placita Parkette Improvements - Landscaping and remodeling of a new park $292,617.30 $294,865.39 1 05/31/2024 SDC Engineering Inc. 05/17/2024 5/22/2024

Page 1586 of 2548 ends

35 K. SUBCONTRACTORS LIST
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Government Code of the State of California, and any amendments thereto, each Bidder shall set forth below: (a) the name and location of the place of business, (b) the California Contractor license number, (c) the DIR public works Contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime Contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

If the Contractor fails to specify a subcontractor for any portion of the work to be performed under the Contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.

We propose to use the following listed subcontractors as per Public Contract Code Section 4100 et seq.: List all Subcontractors. The subcontractor shall be licensed for the type of work they are performing.

Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work

Page 1587 of 2548 ends

36 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work

Page 1588 of 2548 ends

37 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Percent of work to be performed by sub-Contractors: %
(Note: 50% of work is required to be performed by general Contractor) For additional Sub-Contractors, please add additional sheet(s) 0

Page 1589 of 2548 ends

38 L. IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name:

Title:

Firm Name:

Date:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on Contracts for three years.
x
Danny Cancino President SDC Engineering Inc. 05/20/2024

Page 1590 of 2548 ends

39 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a Contractor with the Department of Industrial Relations.1
Name of Bidder: ________________________________________ DIR Registration Number: ________________________________ DIR Registration Expiration: ______________________________ Small Project Exemption: ______ Yes or ______ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain current DIR registration for the duration of the project.

2. Bidder shall maintain a current DIR registration for the duration of the project.

3. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its Contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

4. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder:

Signature:

Name and Title:

Dated:
1 If the Project is exempt from the Contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.” SDC Engineering Inc. 1000060111 06/30/2026 X
SDC Engineering Inc. Danny Cancino - President 05/17/2024

Page 1591 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 1 ends

ADDENDUM No. 1
CIP 502 – Greenbelt Pedestrian Trail
CIP 604 - City Wide ADA Improvements
CIP 194 – Annual Striping Improvements
DATE: 5/16/2024

TO: All Prospective Bidders
Please note the following changes and/or additions to the Contract Documents, Plans and Specifications, for the project indicated above.

1. Response to Questions
Q: Will a listed subcontractor fulfill the C-8 requirement for this contract and the requirements in the Notice Inviting Bids? Is there a limitation on submitting a prime proposal and sub-proposals to other prime bidders for portions of the work?
A. Yes, a prime contractor with a C-27 license with a subcontractor with a C-8 license will meet the license requirements. The prime contractor must be the one submitting the bid. The prime contractor must complete above 50% of the contract with its own forces.

Q: In the sample contract for the above referenced project, the insurance is asking for Builder’s Risk, $5 million GL and $5 million Auto coverage (see pages 47-50 of the PDF file). However, when you look at the Special Provisions for the project, section 5-4 (pages 94-96 of the PDF), there is no mention of Builder’s Risk, and the insurance limits are $2 million for GL and $1 million for the Auto. Which one is correct? The pricing for insurance is very different depending on the amount and the builder’s risk requirement. Also, there is no mention of whether Umbrella coverage can meet requirements. Is that possible?

Page 1592 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 2 ends

A: For Commercial General Liability, the City will require a $2 Million per occurrence and $4 Million general aggregate policy. For Automobile Liability, the City will require a $1 Million policy. Builder's Risk insurance will not be required. Umbrella coverage may be accepted. The sample contract is amended as a part of this Addendum to reflect those requirements after award of bid.

2. Refer to NOTICE INVITING BIDS
Delete the paragraph:

Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00 PM on MONDAY, MAY 20, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 502 Greenbelt Pedestrian Trail, CIP No. 604 City Wide ADA Improvements, and CIP No. 194 Annual Striping Improvements.

Replace with the following:

Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00 PM on THURSDAY, MAY 23, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 502 Greenbelt Pedestrian Trail, CIP No. 604 City Wide ADA Improvements, and CIP No. 194 Annual Striping Improvements.

Delete the paragraph:

Please submit any questions related to this bid on Planet Bids portal no later than 5:00 PM on MONDAY, MAY 9, 2024.

Replace with the following:

Please submit any questions related to this bid on Planet Bids portal no later than 5:00 PM on MONDAY, MAY 20, 2024.

3. Refer to Part IV – BID DOCUMENTS, B. BID SCHEDULE
The Bid Schedule has been revised to more accurately reflect the Plans.

Delete the original Bid Schedule and replace it with Attachment 1.

Page 1593 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 3 ends

4. Refer to Part IV – BID DOCUMENTS, D. BIDDER’S ASSURANCE Delete the words “bidding schedule” and replace with “Bid Schedule.”

5. Refer to Part IV – BID DOCUMENTS, D. BIDDER’S DECLARATION Remove the phrase:

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule
Replace with the following:

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bid Documents.

6. Refer to Part V – CONTRACT DOCUMENTS, A. CONTRACT AGREEMENT Remove the clause:

INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The Contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications edition, Special Provisions, Exhibits A and B and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said Contract documents are made a part hereof as though fully set forth herein. This Contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these

Page 1594 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 4 ends

Contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

Replace with the following:

INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The Contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications for Public Works Construction 2021 edition, Special Provisions, Exhibits A,B, C, D, and E and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said Contract documents are made a part hereof as though fully set forth herein. This Contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not.

Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these Contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

Remove the clause:

LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in Exhibit “A” for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that may become due CONTRACTOR under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

Replace with the following:

LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in Section 6-9 of the Special Provisions for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that

Page 1595 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 5 ends

may become due CONTRACTOR under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

Under Clause 7, Prevailing Wages and California Labor Laws, delete the paragraphs:

When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
When the number of apprentices in training in the area exceeds a ratio of one to five, or
When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state wide or locally, or Assignment of an apprentice to any work performed under a public works Contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to eight journeymen.

Replace with the following:

When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
When the number of apprentices in training in the area exceeds a ratio of one to five, or
When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state wide or locally, or Assignment of an apprentice to any work performed under a public works Contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

Page 1596 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 6 ends

When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to five journeymen.

Delete Section 17(a)(i):

Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

Replace Section 17(a)(i) with the following:

Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

Delete Section 17(a)(ii):

Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.

Replace Section 17(a)(ii) with the following:

Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $1,000,000 per accident for bodily injury and property damage.

Delete Section 17(a)(iv).

7. Refer to Part V – CONTRACT DOCUMENTS, C. EQUALS
Delete the paragraph:

In accordance with the provisions under General Conditions, entitled EQUALS, If the City shall find any item so described equal to the respective item specified,

Page 1597 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 7 ends

then the undersigned may furnish such item, together with all necessary labor, materials, equipment and incidentals required to perform and complete the work.

Replace with the following:

If the City shall find any item so described equal to the respective item specified, then the undersigned may furnish such item, together with all necessary labor, materials, equipment and incidentals required to perform and complete the work.

8. Refer to PART VI – SPECIAL PROVISIONS
Delete Special Provision Section 2-5.4, Haul Routes:

Haul Routes shall be per the City of Hermosa Beach Truck Routes map. See Cover Sheet on project plans.

Replace Special Provision Section 2-5.4, Haul Routes with the following:

Haul Routes shall be per the City of Hermosa Beach Truck Routes map. See Exhibit E of the Contract Documents.

Under Special Provision Section 3-8, Submittals, delete the bullet:
• Crushed Miscellaneous Base material specifications
Replace it with the following:
• Crushed Aggregate Base material specifications
Under Special Provision Section 3-8, Submittals, delete the bullet:
• Constructions Notices sample template shall be provided by the City to the Contractor and modified and submitted to the engineer for review and approval.

Approved Construction Notice shall be distributed by Contactor. See Exhibit C.

Replace it with the following:
• Constructions Notices sample template shall be provided by the City to the Contractor and modified and submitted to the engineer for review and approval.

Approved Construction Notice shall be distributed by Contactor. See Exhibit B.

Under Special Provision Section 7-6.4, delete the paragraph:

Page 1598 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 8 ends

Payment shall be made at the contract unit price per Cubic Foot (CF), Square Foot (SF), Linear Foot (LF), or Lump Sum (LS) as defined in the bid schedule and shall include furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved, complete and in place, as shown in the Plans and in accordance with the contract documents, unclassified excavation, removal of existing improvements and materials, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction, and finishing. No additional compensation will be allowed therefor.

Replace it with:

Payment shall be made at the contract unit price per Cubic Foot (CF), Square Foot (SF), Linear Foot (LF), or Lump Sum (LS) as defined in the bid schedule and shall include furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved, complete and in place, as shown in the Plans and in accordance with the contract documents, unclassified excavation, removal of existing improvements and materials, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction, and finishing. All quantities shall be based on the volume the existing improvements occupy in situ. No additional compensation will be allowed therefor.

Under Special Provision Section 7-6.20, delete the paragraph:

Payment for Construct 4” Stabilized Decomposed Granite Path shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved in this section, complete and in place, as shown in the Plans and in accordance with the contract documents. No additional compensation will be allowed therefor.

Replace it with the following:

Payment for Construct 4” Stabilized Decomposed Granite Path shall be made at the contract unit price per Square Foot (SF) and shall include all grading adjacent to the path as shown on the Plans and furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved in this section, complete and in place, as shown in the Plans and in accordance with the contract documents. No additional compensation will be allowed therefor.

Under Special Provision Section 7-6.24 delete the paragraph

Page 1599 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 9 ends

Payment for Install 48” Box Tree, Install 15 Gallon Shrub, Install 5 Gallon Shrub, Install 1 Gallon Shrub, Install Sod, Install Hydroseed, shall be made at the contract unit price per Square Foot (SF) or contract unit price per each and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including unclassified excavation, removal of existing improvements and materials, preparation of subgrade, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction and finishing. No additional compensation will be allowed therefor.

Replace it with the following:

Payment for Install 48” Box Tree, Install 15 Gallon Shrub, Install 5 Gallon Shrub, Install 1 Gallon Shrub, Install Sod, Provide Soil and Fill 2” Below Top of Curb, and Install Hydroseed, shall be made at the contract unit price per Square Foot (SF) or contract unit price per each and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including unclassified excavation, removal of existing improvements and materials, preparation of subgrade, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction and finishing. No additional compensation will be allowed therefor.

Under Special Provision Section 200-1.1 with the following:

Concrete shall be type 520-C-2500 PSI concrete per the City of Hermosa Beach Standard Plans for Public Works No. 106.

Replace it with the following:

Concrete shall be type 520-C-2500 PSI concrete.

Add the following after paragraph four of Special Provision Section 400-5:

Where there is no curb, the lateral distance between the edge of the sign panel and the edge of the nearest travel say shall be a minimum of 6 feet. Where there is a curb, the lateral distance between the edge of the sign panel and the flowline shall be a minimum of 2 feet.

Page 1600 of 2548 ends
Page 1601 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 11 ends

ACKNOWLEDGEMENT OF ADDENDUM No. 1
CIP 502 – Greenbelt Pedestrian Trail
CIP 604 - City Wide ADA Improvements
CIP 194 – Annual Striping Improvements
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your bid. Failure to do so may result in disqualification of your firm’s bid.

The undersigned acknowledges receipt of Addendum No. 1 dated May 16, 2024.

ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
SDC Engineering Inc. Danny Cancino
24881 Alicia Pkwy Ste E #340, Laguna Hills CA 92653
Principal

Page 1602 of 2548 ends

ADDENDUM NO. 1 – ATTACHMENT 1
B. BID SCHEDULE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-3.4
- $
2 32 LF Remove Existing Curb 7-6.4 $
3 15 LF Remove Existing Curb and
Gutter
7-6.4 $
4 680 SF Remove Existing PCC Sidewalk
and Curb Ramp
7-6.4 $
5 125 SF Remove Existing Pavement
Striping
7-6.4 $
6 1,502 SF Remove Existing AC Pavement 7-6.4 $
7 17,553 CF Remove Existing Wood Chip
Trail
7-6.4 $
8 14,485 SF Clearing and Grubbing 7-6.5 $
9 1 LS
Remove Existing Fitness
Equipment and Associated
Footings
7-6.4
- $
10 6 EA Remove Existing Tree
(Including Stump and Roots)
7-6.6 $
11 1 EA Remove Existing Stump and
Roots
7-6.6 $
12 56 LF Construct 6” Curb 7-6.7 $
13 24 LF Construct 6” PCC Curb and 24”
PCC Gutter
7-6.8 $
14 550 SF Construct 4” PCC Sidewalk 7-6.9 $
15 169 SF Construct 4” PCC Curb Ramp 7-6.10 $
16 87 SF Furnish and Install Detectable
Warning Surface
7-6.11 $

Page 1603 of 2548 ends

Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
17 1502 SF Construct AC Pavement 7-6.12 $
18 2 EA Relocate Existing Sign and
Signpost
7-6.13 $
19 1 EA Furnish and Install Sign Post 7-6.14 $
20 10 EA Furnish and Install Signs 7-6.14 $
21 1 EA Install City Furnished RRFB
Model System on Existing Post
7-6.15 $
22 1 EA Install City Furnished RRFB
Model System on New Post
7-6.15 $
23 0 SF Construct 4’ Ribbon Gutter 7-6.16 $
24 232 LF 4” ADA Parking Striping 7-6.17 $
25 3 EA International Symbol of Access
Pavement Marking
7-6.17 $
26 2 EA “No Parking” Pavement Marking 7-6.17 $
27 20 LF Yield Line Pavement Marking 7-6.17 $
28 120 SF Crosswalk Pavement Marking
(Continental)
7-6.17 $
29 3EA Furnish and Install Wheel Stop 7-6.18 $
30 12 EA Adjust Water Valve to Grade 7-6.19 $
31 1 EA Adjust Backflow System to
Grade
7-6.19 $
32 24,566 SF Construct Stabilized
Decomposed Granite
7-6.20 $
33 346 LF Install Flush Redwood Header 7-6.21 $
34 3,435 LF Install Concealed Redwood
Header
7-6.21 $
35 2 EA Salvage and Reinstall Existing
Memorial Bench
7-6.22 $
36 2 EA Install City Furnished Memorial
Bench
7-6.22 $
37 2 EA Salvage and Reinstall Existing
Trash Can
7-6.22 $
38 2 EA Install City Furnished Fitness
Equipment Set
7-6.22 $
39 160 SF Construct Cast in Place Concrete
Paving for Benches
7-6.23 $

Page 1604 of 2548 ends

(Total Bid in Figures) ______
(Total Bid in Words)
Contractor Name: ______
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of

__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.

Contractor Signature: __________________________________________ Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
40 12 EA Install 48” Box Tree 7-6.24 $
41 14 EA Install 15 Gallon Shrub 7-6.24 $
42 392 EA Install 5 Gallon Shrub 7-6.24 $
43 22 EA Install 1 Gallon Shrub 7-6.24 $
44 2,254 SF Install Sod 7-6.24 $
45 12,324 SF Install Hydroseed 7-6.24 $
46 1 LS Adjust and Install New Existing
Irrigation System
7-6.25 $
47 4 EA Remove Existing Wheel Stops 7-6.4
48 1 EA Adjust Existing Water Fountain
to Grade
7-6.19

49 18 CF Unclassified Excavation 7-6.4
50 915 SF Provide Soil and Fill 2” Below
Top of Curb
7-6.24

Page 1605 of 2548 ends

PW Registration #:

State License #:

Contractor Company Name: __________________________________________ [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
1000060111 986959 SDC Engineering Inc.

Page 1606 of 2548 ends

PALM DR

THE STRAND

VALLEY DR

MANHATTAN AVE

ARDMORE AVE

BAY VIEW DR

PROSPECT AVE

PACIFIC COAST HWY

BEACH DR

MONTEREY BLVD
7TH ST
8TH PL
25TH ST

PIER AVE
10TH ST
5TH ST
6TH ST
2ND ST

HERMOSA AVE
14TH ST
30TH ST

HARPER AVE
31ST ST

GOULD AVE

OCEAN DR
16TH ST
29TH ST
31ST PL
28TH ST
32ND PL

SUNSET DR
30TH PL
17TH ST
33RD ST
29TH CT
33RD PL
ALLEY
28TH CT

LOMA DR
1ST ST
7TH PL
3RD ST

AVIATION BLVD
8TH ST
24TH PL
27TH ST

BOUNDARY PL
9TH ST

OZONE CT
4TH ST
1ST PL

HERONDO ST
24TH ST

LONGFELLOW AVE

ARTESIA BLVD
21ST ST
13TH ST
26TH ST
15TH ST
19TH ST OWOSSO AVE
34TH ST

RHODES ST
11TH ST
20TH ST
OAK ST

INGLESIDE DR
20TH PL

BARD ST

PARK AVE

REYNOLDS LN

MYRTLE AVE
22ND ST

GENTRY ST

HILLCREST DR

POWER ST
35TH PL

GOULD TER
1ST CT
17TH CT
18TH CT
16TH CT
18TH ST
15TH PL
19TH CT
11TH PL
14TH CT

CYPRESS AVE
13TH CT

VALLEY PARK AVE
9TH CT

CIRCLE DR
11TH CT
15TH CT
12TH CT
20TH CT
10TH CT

GOLDEN AVE

CULPER CT
6TH CT

SILVER ST
21ST CT

MASSEY AVE

MEYER CT

HILL ST
5TH CT

SPRINGFIELD AVE
4TH CT

OCEAN VIEW AVE
23RD ST
3RD CT

AMBY PL

HARPER LN

MARLITA PL
13TH ST
5TH ST
25TH ST
24TH ST
21ST ST
1ST ST
21ST ST
11TH ST
9TH ST
1ST ST
20TH ST

CYPRESS AVE
3RD ST
7TH ST 7TH ST
1ST ST

BEACH DR
4TH ST
26TH ST
18TH ST
24TH ST
30TH ST
16TH ST
20TH ST
10TH ST
15TH ST
11TH ST
18TH ST
17TH ST
OAK ST
4TH ST
9TH ST
11TH PL
2ND ST

LOMA DR
6TH ST
10TH ST
19TH ST
ALLEY
1ST PL
34TH ST
24TH PL
14TH ST

LOMA DR
3RD ST
4TH ST
11TH ST
ALLEY
24TH ST
1ST ST
8TH ST
6TH ST
19TH ST
City of Hermosa Beach
Truck Routes
"2015"
ATTACHMENT 2

Page 1607 of 2548 ends

LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK C LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK DEMO LEGEND SYMBOL DESCRIPTION QTY. DEMO PLAN NOTES GENERAL DEMOLITION NOTES: GENERAL DEMOLITION NOTES: 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 D-01 0 10' 20' 1" = 20' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 04 N.I.C NOT IN CONTRACT REMOVE 4-30-24 8 PER PLAN PER PLAN 10 ADDENDUM NO. 1 05/16/24 Page 1608 of 2548 05 N.I.CNOT IN CONTRACT
4-30-24
17' 01 ADDENDUM NO. 1 05/16/24

Page 1609 of 2548 ends
Page 1610 of 2548 ends
Page 1611 of 2548 ends
Page 1612 of 2548 ends
Page 1613 of 2548 ends
Page 1614 of 2548 ends
Page 1615 of 2548 ends
Page 1616 of 2548 ends
Page 1617 of 2548 ends
Page 1618 of 2548 ends
Page 1619 of 2548 ends
Page 1620 of 2548 ends
Page 1621 of 2548 ends
Page 1622 of 2548 ends
Page 1623 of 2548 ends
Page 1624 of 2548 ends
Page 1625 of 2548 ends
Page 1626 of 2548 ends
Page 1627 of 2548 ends
Page 1628 of 2548 ends
Page 1629 of 2548 ends
Page 1630 of 2548 ends
Page 1631 of 2548 ends
Page 1632 of 2548 ends
Page 1633 of 2548 ends

18 IV. BID DOCUMENTS
A. PROPOSAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
CONTRACTOR: Date: ___________________
TO: City of Hermosa Beach
Honorable Mayor and Members of the City Council City Hall Hermosa Beach, California, 90254
Ladies and Gentlemen:

The undersigned declares that he/she has carefully examined the location of the proposed work and that he/she has examined the Plans and Specifications, has read the Contract Documents, and hereby agrees to furnish all labor, materials, equipment, tools, transportation, and services to do all work required for:

CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In accordance with the Plans and Specifications prepared by the Engineer, in accordance with the Special Provisions, the Contract Documents, and in accordance with the Standard Specifications for Public Works Construction 2021, Unified Building Code for Construction (current edition) (except Sections 1-9), and the requirements of the Engineer under said documents, for the prices shown herein.

The Contractor also certifies that they are registered with the Department of Industrial Relations.

All work shall be completed within 50 working days from the date the Notice to Proceed is issued by the Engineer.

Contractor Signature PWCR Registration Number
Gentry General Engineering, Inc. May 20, 2024
1000024189

Page 1634 of 2548 ends

320 W. Tropica Rancho Road Colton, CA 92324
President
Gentry General Engineering, Inc
Brenton Gentry

Page 1635 of 2548 ends

45,000.00
45,000.00

27.00 864.00

52.00 780.00

10.75 7,310.00

44.00 5,500.00

13.00 19,526.00

8.00 140,424.00

9.00 130,365.00
1,280.00
1,280.00
1,600.00 9,600.00
719.00 719.00

40.00 2,240.00

41.00 984.00

8.60 4,730.00

19.00 3,211.00

99.00 8,613.00

Page 1636 of 2548 ends

20.00 30,040.00
467.00 934.00
941.00 941.00
311.00 3,110.00
4,200.00 4,200.00
12,700.00 12,700.00

25.00 5,800.00
479.00 1,437.00
431.00 862.00

48.00 960.00

40.00 4,800.00
347.00 1,041.00
861.00 10,332.00
7,400.00 7,400.00

8.00 196,528.00

6.00 2,076.00

6.25 21,468.75
1,200.00 2,400.00
862.00 1,724.00
1,200.00 2,400.00
8,200.00 16,400.00

36.00 5,760.00

Page 1637 of 2548 ends

Gentry General Engineering, Inc
10%
3,600.00 43,200.00
158.00 2,212.00

52.00 20,384.00

19.00 418.00

4.00 9,016.00

2.00 24,648.00
131,000.00 131,000.00
445.00 $ 1,780.00
6,700.00 $ 6,700.00
103.00 $ 1,854.00

6.60 $ 6,039.00
$961, 710.75
Nine hundred sixty-one thousand seven hundred ten dollars and seventy-five cents

Page 1638 of 2548 ends

1000024189
974279
Gentry General Engineering, Inc

Page 1639 of 2548 ends
Page 1640 of 2548 ends
Page 1641 of 2548 ends
Page 1642 of 2548 ends
Page 1643 of 2548 ends
Page 1644 of 2548 ends
Page 1645 of 2548 ends

26 D. BIDDER'S ASSURANCE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
FROM:

Name of Bidder:

Business Address:

Telephone No:

TO:

Members of the City Council
c/o City Hall
City of Hermosa Beach, California
Members of the City Council:

Pursuant to your published Notice Inviting Bids for: CIP NO. 502 GREENBELT PEDESTRIAN TRAIL, CIP NO. 604 CITY WIDE ADA IMPROVEMENTS, AND CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares that he/she has carefully examined the location of the proposed work; that he/she has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders and hereby proposes to furnish all materials, machinery, tools, labor, and services and do all the work necessary to complete the project in accordance with said Plans and Specifications and other Contract Documents at the item prices on the bidding schedule.

BY: TITLE:

Gentry General Engineering, Inc.
320 W. Tropica Rancho Rd.

Colton CA 92324
909.330.1128
Brenton Gentry President/CEO

Page 1646 of 2548 ends

27 E. BIDDER'S DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
It is understood and agreed that:

1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, Warranty Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.

2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.

3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.

4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.

The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.

5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other Bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding.

6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the Owner after evaluation of the bids as submitted. The undersigned agrees that the Owner shall recover or retain as liquidated damages an amount equal to the difference between the low bid and amount of the bid of the Bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest Bidder in accordance with the provisions of the Public Contract Code section 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.

Page 1647 of 2548 ends

28 7. This bid will not be withdrawn within a period of ninety (90) days after the date of its proper opening by the City.

8. The undersigned Bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.

Respectfully submitted,
Contractor's Business Name Contractor Signature Title
Business Address: Street By Title
City State Zip Contractor's License No. and
Classification
Business Phone Number Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the Bidder, whose address must be given: if it is made by a firm, it must be signed in the co-partnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.

Gentry General Engineering, Inc.
320 W Tropica Rancho Rd.

Colton CA 92324
909.330.1128
Brenton Gentry President/CEO
Colton CA 92324
President/CEO
Brenton Gentry President/CEO
#974279 Class A
May 20, 2024
13435 Arrow Blvd. Fontana CA
909.330.1128

Page 1648 of 2548 ends
Page 1649 of 2548 ends

29 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.

We agree specifically:

1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.

2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.

3. To take affirmative steps to hire minority employees within the company.

FIRM

TITLE OF PERSON SIGNING

SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:

Gentry General Engineering, Inc.

President/CEO
May 20, 2024

Page 1650 of 2548 ends

30 G. CERTIFICATION OF PRINCIPAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.) Signature:

Name:

Title:

Name of Company:

Brenton Gentry
President/CEO
Gentry General Engineering, Inc.

Page 1651 of 2548 ends

31 H. DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned, a duly authorized representative of the Contractor, certifies and declares that:

1. The undersigned Contractor is aware of Section 1771.1 and 1777.7 of the California Labor Code, which prohibit a Contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The undersigned Contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The undersigned Contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a Contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a Contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.”
“(b) Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract, and any public money that may have been paid to a debarred subcontractor by a Contractor on the project shall be returned to the awarding body. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”

4. The undersigned Contractor has investigated the eligibility of each and every subcontractor the undersigned Contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, at (place of execution), California.

Signature:

Name:

Title:

Name of Company:
20th May
Colton
Brenton Gentry
President/CEO
Gentry General Engineering, Inc.

Page 1652 of 2548 ends
Page 1653 of 2548 ends

32 I. NON-COLLUSION DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares:

I am the ___________________ of ______________________________, the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on __________ [date], at ___________________ [city], ___________________ [state].

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP
President/CEO Gentry General Engineering, Inc.

May 20, 204
Colton California
Gentry General Engineering, Inc.
320 W Tropica Rancho Rd.

Colotn CA 92324

Page 1654 of 2548 ends
Page 1655 of 2548 ends

33 J. REFERENCES OF WORK
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Provide names, addresses, phone numbers and email addresses for at least three public agencies for which Bidder has performed similar work within the past five years.

All contact information must be current.

1. _______________________________________________________________________ Name and Address of Public Agency _________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion Number of Change Orders ____________

2.______________________________________________________________________ Name and Address of Public Agency _________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion Please see attached

Page 1656 of 2548 ends

34 Number of Change Orders ____________

3.________________________________________________________________________ Name and Address of Public Agency _________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion Number of Change Orders ____________
For additional References, please add separate sheets.

NAME OF BIDDER

SIGNATURE OF BIDDER DATE
Gentry General Engineering, Inc.

May 20, 2024

Page 1657 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
Prior Projects
2013 – $34,500.00
City of Fontana
Damaged Street/Sidewalk
Asphalt & Concrete R&R
8353 Sierra Ave
Fontana, Ca 92335
Jason Jojola: No Email Address
909.350.6636
2014 – $30,000.00
City of Rancho Cucamonga
Solar Shade Structure
8794 Lion St.

Rancho Cucamonga, Ca 91730
909.477.2730 (No Email Address)
2015 – $495,000
City of Whittier
Fire Loop/Fire Sprinkler Repair
9401Painter Ave
Whittier, Ca 90605
Karla Embry: [email protected] 562.332.9303
2015 – $41,000
City of Glendora
Water Improvement
116 E. Foothill Blvd.

Glendora, Ca 91741
Carlos Cigneros: No Email Address
626.786.1285
2016 – $504,420
City of Baldwin Park
Alleyway Street/Sidewalk
Asphalt & Concrete R&R
14403 Pacific Ave
Baldwin Park, Ca 91706
Chase Fidler: [email protected]
626.960.4011
2016 – $619,075
City of Bloomington
ADA Ramp – Repair/Maintenance/Replaced
825 E. 3rd Street
San Bernardino, CA 92415
Haile Ford: [email protected]
909.387.7936
2016 – $173,604
City of Montclair
Alleyway Street/Sidewalk Asphalt & Concrete
5111 Benito St
Montclair, Ca 91763
Steve Stanton: [email protected]
909.625.9444
2017 – $325,000
City of Upland
Damaged Street/Sidewalk
Asphalt & Concrete R&R
1370 North Benson Ave
Upland, Ca 91785
Tony Trejo: [email protected] 909.631.3918

Page 1658 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2017 – $624,688
Santa Ana
Repair Maintenance/Replaced
Damaged Street/Sidewalk
Asphalt & Concrete R&R
20 Civic Center Plaza
Santa Ana, Ca 92701
Victor So: [email protected]
714.647.5076
2017 – $694,000
City of Corona
Miscellaneous Concrete Repair
400 S. Vicentia Ave, Ste. 210
Corona, Ca 92882
Barry Ghaemi: [email protected] 951.739.4961
2017 – $30,000
City of San Diego
Demo/Backfill/Compact Existing
Vault Location
422 W. Washington St.

San Diego, Ca 92103
Matt Cavan: [email protected]
951.684.1909
2018 – $1.2 Million
City of Torrance
Damaged Street/Sidewalk
Asphalt & Concrete R&R
20500 Madrona Ave
Torrance, Ca 90503
Shin Furukawa: [email protected]
310.618.3073
2018 – $547,950
City of Pasadena
Miscellaneous Concrete Repair
100 Garfield Ave
Pasadena, Ca 91101
Morley Saralya: [email protected]
626.744.3703
2018 – $2.2 Million
City of Torrance
Downtown Torrance Active Transportation
Improvements
20500 Madrona Ave
Torrance, Ca 90503
Justin Gatza: [email protected]
310.618.3032
2019 – $288,974
City of Barstow
Water Treatment Plant Dewatering Pad & Wall
2200 Riverside Dr.

Barstow, Ca 92311
Kody Topkins: [email protected]
760.252.2538
2019 - $544,342
Torrance Unified School District
Anza, Arnold and Hickory ES Site Drainage
21400 Ellinwood Dr
Torrance, CA 90503
Joe Winterburn:
[email protected]
(949) 502-4000
2019 - $714,000
City of Hermosa Beach
8 th Street Improvements Project
8 th Street
Hermosa Beach, CA 90254
Reed Salan: [email protected]
(310) 318-0229

Page 1659 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2019 - $267,000
Costa Mesa Sanitary District
Indus Sewer Main Replacement
20122 Santa Ana Ave
Newport Beach, CA 92660
Rob Hamers: [email protected]
(949) 548-1192
2019 - $285,744
City of Fullerton
Curb/Gutter and Sidewalk Reconstruction
Fullerton, CA 92831
Jose Medina: [email protected]
(714) 738-6863
2019 - $141,312 ($139,573 original bid; work
limits increased)
City of Irvine
Ranch Park Bike Trail Rehabilitation
Irvine, CA 92618
Anthony Caraveo: [email protected]
(949) 724-7365
2019 - $644,763
City of Thousand Oaks
Concrete Replacement and Sidewalk Repair
Program
Thousand Oaks, CA 91320
Michelle McCarty: [email protected]
(805) 449-2477
2019 - $14,800.00
Whittier Unified School District (Whittier CHS)
Refurbish Long Jump Pits
9401 S. Painter Ave.,
Whittier, CA 90605
Danny True –
[email protected]
(562) 237-0795
2019 - $210,000
Lynwood Middle School (USD)
Storm Drain Improvements
11321 Bullis Road
Lynwood, CA 90262
Manuel Jaramillo: [email protected]
(323)447-0996
2020 - $1,369,000
City of Torrance
Sidewalk Repair for Handicap Accessibility
Torrance, CA 90505
Shin Furukawa: [email protected]
(310) 781-6900
2020 - $19,546
City of Fontana
San Bernardino at Cypress Driveway
Improvements
Fontana, CA 92335
Christopher Smethurst:
[email protected]
(909) 350-6649
2020 - $158,338 ($149,835 original bid;
additional grading work performed)
City of Walnut
Butterfield Park Trail Rehabilitation
21201 La Puente Rd
Walnut, CA 91789
Tony Lopez: [email protected]
(909) 594-9702

Page 1660 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2020 - $29,820
City of Irwindale
Peppertree Bus Shelter Removal and Foothill
Column
5050 N Irwindale Ave
Irwindale, CA 91706
Elizabeth Rodriguez –
[email protected]
(626) 430-2211
2020 - $5,565
City of Irwindale
Arrow Bus Shelter Roof Repair
5050 N Irwindale Ave
Irwindale, CA 91706
Elizabeth Rodriguez –
[email protected]
(626) 430-2211
2021 - $22,000
Whittier Unified School District
Collapsed Storm Drain Repair
9401 S. Painter Ave.,
Whittier, CA 90605
Danny True –
[email protected]
(562) 237-0795
2021 - $29,999
Costa Mesa Sanitary District
Manhole Surface Repairs Phase 7
290 Paularino Ave
Costa Mesa, CA 92626
Michael Benesh –
[email protected]
(949) 548-1192
2021 - $366,732
City of Laguna Beach
Zones 2 and 3 Street Concrete Improvements
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729
2021 – $221,318 ($211,965 original bid; extra
work added)
City of Laguna Beach
Ramona Alley Decorative Paving Replacement
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729
2021 - $198,420
Chino Valley Unified School District
Briggs K-8 Waterline Upgrades
11880 Roswell Ave
Chino, CA 91710
Sam Sousa –
[email protected]
(909) 628-1201 x1490
2021 - $125,400
Torrance Unified School District
Seaside Elementary Site Drainage Improvement
2335 Plaza Del Amo
Torrance, CA 90501
Ryan Palmer –
[email protected]
(310) 972-6240

Page 1661 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2021 - $252,796
City of Rancho Cucamonga
Citywide Concrete Repair
10500 Civic Center Dr
Rancho Cucamonga, CA 91730
Ernie Ruiz –
[email protected]
(909) 774-4108
2021 - $41,750
State of California
Moro State Deck and ADA Access
715 P Street
Sacramento, CA 94296
Michelle Humphrey –
[email protected]
(949) 366-8533
2021 - $1,924,055
City of Anaheim
Alley Sanitary Sewer Improvement
200 S Anaheim Blvd
Anaheim, CA 92805
Scott Yanagihara –
[email protected]
(714) 231-4696
2022 - $9,010,551 ($8,449,000 original bid;
plans/specs revised post-award)
State of California
Doheny State Beach Projects A, B and C
715 P Street
Sacramento, CA 95832
Ryan McBride –
[email protected]
(714) 833-1792
2022 - $88,066
Cucamonga Valley Water District
Nitrate Facility Retaining Wall
10440 Ashford St
Rancho Cucamonga, CA 91730
Tyler Bui –
[email protected]
(909) 483-7455
2022 - $148,029
County of San Bernardino
Laurel Ave/Randall Ave Drainage Improvement
825 E 3rd St
San Bernardino, CA 92415
Carlos Seanez –
[email protected]
(909) 486-0227
2022 – $98,050
City of Laguna Beach
Citywide Guardrails
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729
2022 - $121,318 ($111,000 original bid; work
limits extended)
City of Orange
Chapman Ave Alley Improvement
300 E Chapman Ave
Orange, CA 92866
Karl Schmidt –
[email protected]
(714) 744-5562

Page 1662 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2022 - $1,085,610.50
City of Torrance
Citywide Sidewalk Repair for Disabled
Accessibility
3031 Torrance Blvd
Torrance, CA 90503
Marc Simons –
[email protected]
(424) 399-3193
2022 - $7,997
City of Rancho Cucamonga
Citywide Fence Repair
8794 Lion St
Rancho Cucamonga, CA 91730
Phillip Ortega –
[email protected]
(909) 477-2730
2022 - $206,496 ($200,010 original bid; design
revisions)
City of El Segundo
W Mariposa Ave and W Pine Ave Sidewalk
Construction
350 Main St
El Segundo, CA 90245
Floriza Rivera –
[email protected]
(310) 524-2361
2022 - $413,420
Temecula Valley Unified School District
Vintage Hills Elementary School Modernization
31350 Rancho Vista Rd
Temecula, CA 92592
Jim Flath –
[email protected]
(951) 501-9594
2022 - $5,700
City of Rancho Cucamonga
Way Finder Monument Sign Replacement
8794 Lion St
Rancho Cucamonga, CA 91730
Phillip Ortega –
[email protected]
(909) 477-2730
2022 - $426,472 ($508,372 original bid; some
bid schedule items deleted from work)
County of San Bernardino
Ridgecrest Rd Sidewalk and Ramps
825 E 3rd St
San Bernardino, CA 92415
Carlos Seanez –
[email protected]
(909) 486-0227
2022 - $48,606
City of Rancho Cucamonga
Calle Carabe Sidewalk Repair
8794 Lion St
Rancho Cucamonga, CA 91730
Richard Favela –
[email protected]
(909) 774-4107
2022 – $128,695
City of Laguna Beach
Peppertree Parking Lot Rehabilitation
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729

Page 1663 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2022 - $529,424 ($489,075 bid value;
quantities/limits increased)
City of El Monte
Sidewalk and Curb Ramp Reconstruction
11333 Valley Blvd
El Monte, CA 91731
John Rico –
[email protected]
(626) 258-8833
2022 - $47,522 ($44,236 bid value; additional
signage added to scope)
City of El Monte
City Hall Parking Lot ADA Improvements
11333 Valley Blvd
El Monte, CA 91731
Kevin Ko –
[email protected]
(626) 580-2058
2022 - $142,591
City of Rancho Cucamonga
Heritage Community Park Pedestrian Trail
Rehabilitation
8794 Lion St
Rancho Cucamonga, CA 91730
Richard Favela –
[email protected]
(909) 774-4107
2022 - $15,600
City of Rancho Cucamonga
Carnelian Block Wall Repair
8794 Lion St
Rancho Cucamonga, CA 91730
Richard Favela –
[email protected]
(909) 774-4107
2022 - $8,922
City of Rancho Cucamonga
Guardrail Replacement at Woodruff and
Highland
8794 Lion St
Rancho Cucamonga, CA 91730
Phillip Ortega –
[email protected]
(909) 477-2730
2022 – $176,450 ($138,925 bid value;
limits/quantities increased)
City of Orange
Chapman and Yorba Sidewalk Construction
300 E Chapman Ave
Orange, CA 92866
Eric Perez –
[email protected]
(714) 744-4107
2022 - $109,208 ($99,420 bid value; scope of
work increased
City of Rancho Cucamonga
Construction of Pickleball Courts at Redhill Park
8794 Lion St
Rancho Cucamonga, CA 91730
Jenny Hanlon –
[email protected]
(909) 774-2343
2022 - $181,909.90 (original bid $186,155;
actual quantities less than bid schedule)
County of San Bernardino
City Creek Guardrails
825 E 3rd St
San Bernardino, CA 92415
Carlos Seanez –
[email protected]
(909) 486-0227

Page 1664 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2022 - $240,528 ($233,440.68 bid value; limits
extended)
City of Fontana
Foothill-Alder Curb Ramp
8353 Sierra Ave
Fontana, CA 92335
Estephany Monroy
[email protected]
(909) 350-6642
2023 - $163,771.34 ($200,000 bid value; on-call
contract)
City of Laguna Niguel
Citywide Concrete Infrastructure Repair
30111 Crown Valley Pkwy
Laguna Niguel, CA 92677
Jeff Metz
[email protected]
(949) 362-4344
2023 - $281,019 ($207,793 bid value; locations
added and scope of work increased)
City of Hermosa Beach
Prospect Ave Curb Ramps, Longfellow Sidewalk
Improvements and ADA Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $646,577.87 (original bid $552,252)
City of Downey
Annual Miscellaneous Concrete Repairs
11111 Brookshire Ave
Downey, CA 90241
Brian Aleman –
[email protected]
(562) 904-7110
2022 - $101,192.76
City of Rancho Cucamonga
Emergency Trail Repairs
8794 Lion St
Rancho Cucamonga, CA 91730
Sonny Rodriguez –
[email protected]
(909) 477-2730
2023 - $46,793.44
City of Hermosa Beach
Clark Field Restroom Plumbing Upgrades and
Site Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $26,800.00
City of Hermosa Beach
South Park Restroom Plumbing Upgrades and
Site Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $2,664,896.83 (original bid
$2,696,271.90; actual quantities less than bid
schedule)
City of Upland
17th St Water Main Replacement and Street
Rehabilitation
460 N Euclid Ave
Upland, CA 91786
Kirk Swanner –
[email protected]
(909) 291-2938

Page 1665 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2023 - $206,328.96 (original bid $194,031;
locations added to scope)
City of Hermosa Beach
City Sidewalk Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $298,889 (original bid $194,500;
significant redesigns and scope increases)
City of South Gate
Citywide Valve Replacement
8650 California Ave
South Gate, CA 90280
Ana Ananda –
[email protected]
(323) 563-5769

Page 1666 of 2548 ends

35 K. SUBCONTRACTORS LIST
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Government Code of the State of California, and any amendments thereto, each Bidder shall set forth below: (a) the name and location of the place of business, (b) the California Contractor license number, (c) the DIR public works Contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime Contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

If the Contractor fails to specify a subcontractor for any portion of the work to be performed under the Contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.

We propose to use the following listed subcontractors as per Public Contract Code Section 4100 et seq.: List all Subcontractors. The subcontractor shall be licensed for the type of work they are performing.

Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
V&E Tree Service PO Box 3280, Orange, CA 92865
654506 1000001936
(714) 997-0903 $30,700
tree and stump trimming and removal, arborist services if required 3%

Page 1667 of 2548 ends

36 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Marina Landscape, Inc 3707 W Garden Grove Blvd, Orange, CA 92868 landscape, irrigation, redwood header, and decomposed granite 492862 1000000079
(714) 939-6600 $358,566
Chrisp Company 43650 Osgood Rd, Fremont, CA 94539
striping, RRFB installation and signs
374600 1000000306
(510) 656-2840 $35,498
37%
3%

Page 1668 of 2548 ends

37 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Percent of work to be performed by sub-Contractors: %
(Note: 50% of work is required to be performed by general Contractor) For additional Sub-Contractors, please add additional sheet(s) 43%

Page 1669 of 2548 ends

38 L. IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name:

Title:

Firm Name:

Date:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on Contracts for three years.

Brenton Gentry
President/CEO
Gentry General Engineering, Inc.

May 20, 2024

Page 1670 of 2548 ends
Page 1671 of 2548 ends

39 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a Contractor with the Department of Industrial Relations.1
Name of Bidder: ________________________________________ DIR Registration Number: ________________________________ DIR Registration Expiration: ______________________________ Small Project Exemption: ______ Yes or ______ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain current DIR registration for the duration of the project.

2. Bidder shall maintain a current DIR registration for the duration of the project.

3. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its Contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

4. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder:

Signature:

Name and Title:

Dated: 1
If the Project is exempt from the Contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.” Gentry General Engineering, Inc.
1000024189
06/30/2025
X
Gentry General Engineering, Inc.

Brenton Gentry - President/CEO
May 20, 2024

Page 1672 of 2548 ends

32 I. NON-COLLUSION DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares:

I am the ___________________ of ______________________________, the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on __________ [date], at ___________________ [city], ___________________ [state].

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP
President SDC Engineering Inc. SDC Engineering Inc.
24881 Alicia Pkwy Ste E #340

Laguna Hills, CA 92653 5/17/2024 Laguna Hills California

Page 1673 of 2548 ends

5/21/24
Irvine CA

Page 1674 of 2548 ends

Gentry General Engineering, Inc
320 W Tropica Rancho Rd
Colton, CA 92324
(909) 330-1128
BID 24-002
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL, CIP NO. 604 CITY WIDE ADA IMPROVEMENTS, & CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS To whom it may concern,
I am writing to protest the proposals submitted on May 23, 2024 by SDC Engineering Inc and Cook Development Group, Inc. for the CIP 502 Greenbelt Pedestrian Trail, CIP 604 City Wide ADA Improvements, and CIP 194 Annual Striping Improvements projects. It is our assessment that the aforementioned bidders are nonresponsive/nonresponsible on the following grounds:

Section III: Instruction to Bidders mandates (page 9) that "the proposal shall be fully executed and submitted on the forms provided by the City" and that Form I: Non-Collusion Declaration "shall be signed and returned to the City with the Bid Proposal." Section III:

Instruction to Bidders goes on to clarify (page 12) that "the award of contract, if it be awarded, will be to the lowest responsible Bidder whose proposal complies with all of the requirements prescribed." Having failed to sign and return Form I: Non-Collusion Declaration with their bid proposals, neither SDC Engineering Inc nor Cook Development Group, Inc can be considered the "lowest responsible bidder whose proposal complies with all of the requirements prescribed," and must both be found nonresponsible.

It is worth noting that a non-collusion declaration constitutes far more than a mere formality; rather, it is a fundamental and indispensable element of any fair public bid. Failure to execute a non-collusion declaration is not a minor oversight, but a universally disqualifying offense. The City's own specification subsection "Disqualification of Bidders" (page 12) concurs, specifically listing any "reason for believing that collusion exists" as grounds for a proposal's rejection.

Thank you,
Brenton Gentry - President, Gentry General Engineering, Inc

Page 1675 of 2548 ends

Public Works
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

6/12/2024
To All Bidders:

RE: CIP 502 Greenbelt Pedestrian Trail, et al. Project Bid Protest Determination On May 23, 2024, the City of Hermosa Beach (City) received a total of six (6) bids for the subject projects including the bid of the apparent low bidder, SDC Engineering, Inc., (“SDC”)(Exhibit A), the bid of the next apparent lowest bidder, Cook Development Group, Inc. (“Cook Development”)(Exhibit B), and the bid of the third apparent lowest bidder, Gentry General Engineering, Inc. (“Gentry”)(Exhibit C). Upon review of bids, it was discovered that SDC and Cook Development did not include a signed executed copy of Form I. Non-Collusion Declaration. Subsequently, the City requested the missing signed form from SDC and Cook Development and notified all bidders of this request on May 29, 2024. On May 29, 2024, the City then received a formal bid protest with respect to the subject projects from Gentry (Exhibit D). On May 29, 2024, the City received the signed Non-Collusion Declaration form from SDC (Exhibit E) and on May 30, 2024, the City received the signed Non-Collusion Declaration form from Cook Development (Exhibit F).

To summarize Gentry’s protest, since the apparent low bidder and the next apparent lowest bidder did not include a fully executed Non-Collusion Declaration in their bids at the time of bid opening, their bids are non-responsive and should be rejected.

Per the Protest Procedures outlined in Section III, Instruction to Bidders, in the Project Contract Documents, the bid protest was sent to all parties that may be affected by the outcome of the protest. A deadline for submitting a response to the bid protest was established for June 6, 2024 and SDC sent their response on June 4, 2024 (Exhibit G).

The City rejects Gentry’s protest. Compliance with applicable law is an implied term of every contract. (Miracle Auto Center v. Superior Court (1998) 68 Cal.App.4th 818, 821). A non-collusion declaration merely certifies that the contractor did not submit an illegal, collusive bid. A contractor that fails to complete the declaration nonetheless represents that it did not submit an illegal, collusive bid under Miracle Auto Center. Because a bidder cannot withdraw its bid on the basis of such missing form, the irregularity is a defect that can be waived. (MCM Construction, Inc v. City and County of San Francisco (1998) 66 Cal.App.4th 359, 370-372). Judson Pacific-Murphy Corp. v. Durkee (1956) 144 Cal.App.2d provides additional clarification regarding these matters:

It must be remembered that competitive bidding statutes, and those requiring licenses for bidding on public work, are for the benefit of the public and not for the benefit of bidders or licensees. It certainly would amount to a disservice to the public if a losing bidder were to be permitted to comb through the bid proposal or license application of the low bidder after the fact, cancel the low bid on minor technicalities, with the hope of securing acceptance of his, a higher bid. Such

Page 1676 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 2 ends

construction would be adverse to the best interests of the public and contrary to public policy. (377, 383)
The City rejects the protest, determines that the apparent low bidder is the lowest responsive and responsible bidder, and intends to recommend that the City Council accept the apparent low bidder’s bid on this basis and award the contract to SDC.

If you wish to further contest this protest, please file a statement of appeal with the City Clerk within five (5) calendar days of the issuance of this decision. Said statement of appeal shall include all information required of the original bid protest, as well as a short and plain statement setting forth why Protester disputes the City Manager’s decision and the legal and factual basis for such dispute.

Sincerely,
Andrew Nguyen
Project Manager
Cc: Joe San Clemente, Public Works Director
Lucho Rodriguez, City Engineer
Brandon Araujo, Senior Engineer
Patrick Donegan, City Attorney
Myra Maravilla, City Clerk
Exhibit A: SDC’s Bid
Exhibit B: Cook Development’s Bid
Exhibit C: Gentry’s Bid
Exhibit D: Gentry’s Bid Protest
Exhibit E: SDC’s signed Non-Collusion Declaration
Exhibit F: Cook Development’s signed Non-Collusion Declaration Exhibit G: SDC’s Response to Gentry’s Bid Protest

Page 1677 of 2548 ends

EXHIBIT A

Page 1678 of 2548 ends

18 IV. BID DOCUMENTS
A. PROPOSAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
CONTRACTOR: Date: ___________________
TO: City of Hermosa Beach
Honorable Mayor and Members of the City Council City Hall Hermosa Beach, California, 90254
Ladies and Gentlemen:

The undersigned declares that he/she has carefully examined the location of the proposed work and that he/she has examined the Plans and Specifications, has read the Contract Documents, and hereby agrees to furnish all labor, materials, equipment, tools, transportation, and services to do all work required for:

CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In accordance with the Plans and Specifications prepared by the Engineer, in accordance with the Special Provisions, the Contract Documents, and in accordance with the Standard Specifications for Public Works Construction 2021, Unified Building Code for Construction (current edition) (except Sections 1-9), and the requirements of the Engineer under said documents, for the prices shown herein.

The Contractor also certifies that they are registered with the Department of Industrial Relations.

All work shall be completed within 50 working days from the date the Notice to Proceed is issued by the Engineer.

Contractor Signature PWCR Registration Number
SDC Engineering Inc. 5/17/2024 1000060111

Page 1679 of 2548 ends

ADDENDUM NO. 1 – ATTACHMENT 1
B. BID SCHEDULE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-3.4
- $
2 32 LF Remove Existing Curb 7-6.4 $
3 15 LF Remove Existing Curb and
Gutter
7-6.4 $
4 680 SF Remove Existing PCC Sidewalk
and Curb Ramp
7-6.4 $
5 125 SF Remove Existing Pavement
Striping
7-6.4 $
6 1,502 SF Remove Existing AC Pavement 7-6.4 $
7 17,553 CF Remove Existing Wood Chip
Trail
7-6.4 $
8 14,485 SF Clearing and Grubbing 7-6.5 $
9 1 LS
Remove Existing Fitness
Equipment and Associated
Footings
7-6.4
- $
10 6 EA Remove Existing Tree
(Including Stump and Roots)
7-6.6 $
11 1 EA Remove Existing Stump and
Roots
7-6.6 $
12 56 LF Construct 6” Curb 7-6.7 $
13 24 LF Construct 6” PCC Curb and 24”
PCC Gutter
7-6.8 $
14 550 SF Construct 4” PCC Sidewalk 7-6.9 $
15 169 SF Construct 4” PCC Curb Ramp 7-6.10 $
16 87 SF Furnish and Install Detectable
Warning Surface
7-6.11 $
$100.00 3,200.00
$200.00 3,000.00 $4.00 2,720.00 $25.00 3,125.00
$4.25 6,383.50 $6.17 108,302.01 $1.85 26,797.25
8,500.00 $2,500.00 15,000.00 $1,760.00 1,760.00 $100.00 5,600.00 $200.00 4,800.00 $22.00 12,100.00 $28.50 4,816.50 $65.00 5,655.00 37,539.70

Page 1680 of 2548 ends

Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
17 1502 SF Construct AC Pavement 7-6.12 $
18 2 EA Relocate Existing Sign and
Signpost
7-6.13 $
19 1 EA Furnish and Install Sign Post 7-6.14 $
20 10 EA Furnish and Install Signs 7-6.14 $
21 1 EA Install City Furnished RRFB
Model System on Existing Post
7-6.15 $
22 1 EA Install City Furnished RRFB
Model System on New Post
7-6.15 $
23 0 SF Construct 4’ Ribbon Gutter 7-6.16 $
24 232 LF 4” ADA Parking Striping 7-6.17 $
25 3 EA International Symbol of Access
Pavement Marking
7-6.17 $
26 2 EA “No Parking” Pavement Marking 7-6.17 $
27 20 LF Yield Line Pavement Marking 7-6.17 $
28 120 SF Crosswalk Pavement Marking
(Continental)
7-6.17 $
29 3EA Furnish and Install Wheel Stop 7-6.18 $
30 12 EA Adjust Water Valve to Grade 7-6.19 $
31 1 EA Adjust Backflow System to
Grade
7-6.19 $
32 24,566 SF Construct Stabilized
Decomposed Granite
7-6.20 $
33 346 LF Install Flush Redwood Header 7-6.21 $
34 3,435 LF Install Concealed Redwood
Header
7-6.21 $
35 2 EA Salvage and Reinstall Existing
Memorial Bench
7-6.22 $
36 2 EA Install City Furnished Memorial
Bench
7-6.22 $
37 2 EA Salvage and Reinstall Existing
Trash Can
7-6.22 $
38 2 EA Install City Furnished Fitness
Equipment Set
7-6.22 $
39 160 SF Construct Cast in Place Concrete
Paving for Benches
7-6.23 $
$16.29 24,467.58 $500.00 1,000.00 $760.00 760.00 $350.00 3,500.00 $1,930.00 1,930.00 $2,625.00 2,625.00 - -
$3.60 835.20
$303.00 909.00 $300.00 600.00 $55.00 1,100.00 $25.00 3,000.00 $303.00 909.00 $500.00 6,000.00 $2,500.00 2,500.00 $10.46 256,960.36 $8.14 2,816.44 $7.60 26,106.00 $3,500.00 7,000.00 $2,000.00 4,000.00 $760.00 1,520.00
$17,500.00 35,000.00
$50.00 8,000.00

Page 1681 of 2548 ends

(Total Bid in Figures) ______
(Total Bid in Words)
Contractor Name: ______
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of

__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.

Contractor Signature: __________________________________________ Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
40 12 EA Install 48” Box Tree 7-6.24 $
41 14 EA Install 15 Gallon Shrub 7-6.24 $
42 392 EA Install 5 Gallon Shrub 7-6.24 $
43 22 EA Install 1 Gallon Shrub 7-6.24 $
44 2,254 SF Install Sod 7-6.24 $
45 12,324 SF Install Hydroseed 7-6.24 $
46 1 LS Adjust and Install New Existing
Irrigation System
7-6.25 $
47 4 EA Remove Existing Wheel Stops 7-6.4
48 1 EA Adjust Existing Water Fountain
to Grade
7-6.19

49 18 CF Unclassified Excavation 7-6.4
50 915 SF Provide Soil and Fill 2” Below
Top of Curb
7-6.24

$2,500.00 30,000.00 $600.00 8,400.00 $5.00 1,960.00
$3.95 86.90 $6.50 14,651.00 $0.85 10,475.40 $75,000.00 75,000.00 $350.00 $1,400.00 $3,850.00 $3,850.00 $200.00 $3,600.00 $3.23 $2,955.45
$843,216.29 Eight hundred fourty three thousand, two hundred and sixteen dollar and twenty nine cents SDC Engineering Inc. $84, 321.62 ---------------------------------------- $125,000.00 $125,000.00

Page 1682 of 2548 ends
Page 1683 of 2548 ends
Page 1684 of 2548 ends
Page 1685 of 2548 ends
Page 1686 of 2548 ends
Page 1687 of 2548 ends

26 D. BIDDER'S ASSURANCE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
FROM:

Name of Bidder:

Business Address:

Telephone No:

TO:

Members of the City Council
c/o City Hall
City of Hermosa Beach, California
Members of the City Council:

Pursuant to your published Notice Inviting Bids for: CIP NO. 502 GREENBELT PEDESTRIAN TRAIL, CIP NO. 604 CITY WIDE ADA IMPROVEMENTS, AND CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares that he/she has carefully examined the location of the proposed work; that he/she has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders and hereby proposes to furnish all materials, machinery, tools, labor, and services and do all the work necessary to complete the project in accordance with said Plans and Specifications and other Contract Documents at the item prices on the bidding schedule.

BY: TITLE:

SDC Engineeering Inc.
24881 Alicia Pkwy Ste E #340,

Laguna Hills, CA 92653

(949) 280-2863 Danny Cancino President

Page 1688 of 2548 ends

27 E. BIDDER'S DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
It is understood and agreed that:

1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, Warranty Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.

2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.

3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.

4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.

The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.

5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other Bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding.

6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the Owner after evaluation of the bids as submitted. The undersigned agrees that the Owner shall recover or retain as liquidated damages an amount equal to the difference between the low bid and amount of the bid of the Bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest Bidder in accordance with the provisions of the Public Contract Code section 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.

Page 1689 of 2548 ends

28 7. This bid will not be withdrawn within a period of ninety (90) days after the date of its proper opening by the City.

8. The undersigned Bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.

Respectfully submitted,
Contractor's Business Name Contractor Signature Title
Business Address: Street By Title
City State Zip Contractor's License No. and
Classification
Business Phone Number Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the Bidder, whose address must be given: if it is made by a firm, it must be signed in the co-partnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.

SDC Engineering Inc. President
24881 Alicia Pkwy Ste E #340,

Laguna Hills, CA 92653 Danny Cancino President 986959 (949) 280-2863 5/17/2024 Danny Cancino President 25341 Barents Laguna Hills, CA 92653 (562) 922-4420

Page 1690 of 2548 ends

29 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.

We agree specifically:

1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.

2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.

3. To take affirmative steps to hire minority employees within the company.

FIRM

TITLE OF PERSON SIGNING

SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:

SDC Engineering Inc. President 5/17/2024

Page 1691 of 2548 ends

30 G. CERTIFICATION OF PRINCIPAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.) Signature:

Name:

Title:

Name of Company:

Danny Cancino President SDC Engineering Inc.

Page 1692 of 2548 ends

31 H. DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned, a duly authorized representative of the Contractor, certifies and declares that:

1. The undersigned Contractor is aware of Section 1771.1 and 1777.7 of the California Labor Code, which prohibit a Contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The undersigned Contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The undersigned Contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a Contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a Contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.”
“(b) Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract, and any public money that may have been paid to a debarred subcontractor by a Contractor on the project shall be returned to the awarding body. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”

4. The undersigned Contractor has investigated the eligibility of each and every subcontractor the undersigned Contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, at (place of execution),
California.

Signature:

Name:

Title:

Name of Company:

Danny Cancino President SDC Engineering Inc. May 17th Laguna Hills

Page 1693 of 2548 ends

33 J. REFERENCES OF WORK
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Provide names, addresses, phone numbers and email addresses for at least three public agencies for which Bidder has performed similar work within the past five years.

All contact information must be current.

1. _______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________

2.______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
RKA Consulting Group - 398 Lemon Creek Drive, Suite E Walnut, CA 91789 Tony Estes - (909) 373-5437 Tri City Mental Health Garden Repair - To demo and rebuild a garden including garden equipment

and sheds. $599,944.36 07/31/2024 $612,156.91 4
05/21/2024 RKA Consulting Group - 398 Lemon Creek Drive, Suite E Walnut, CA 91789 Tony Estes - (909) 373-5437 Building a Trail on Lemon ave for the City of Bradbury $181,597.77 $216,350.73 1/18/2024 01/11/2024

Page 1694 of 2548 ends

34 Number of Change Orders ____________

3.________________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________
For additional References, please add separate sheets.

NAME OF BIDDER

SIGNATURE OF BIDDER DATE
3 City of Placentia - 401 E Chapman Ave. Placentia, CA 92870 Raquel Garcia - (714) 993-8128 La Placita Parkette Improvements - Landscaping and remodeling of a new park $292,617.30 $294,865.39 1 05/31/2024 SDC Engineering Inc. 05/17/2024 5/22/2024

Page 1695 of 2548 ends

35 K. SUBCONTRACTORS LIST
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Government Code of the State of California, and any amendments thereto, each Bidder shall set forth below: (a) the name and location of the place of business, (b) the California Contractor license number, (c) the DIR public works Contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime Contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

If the Contractor fails to specify a subcontractor for any portion of the work to be performed under the Contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.

We propose to use the following listed subcontractors as per Public Contract Code Section 4100 et seq.: List all Subcontractors. The subcontractor shall be licensed for the type of work they are performing.

Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work

Page 1696 of 2548 ends

36 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work

Page 1697 of 2548 ends

37 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Percent of work to be performed by sub-Contractors: %
(Note: 50% of work is required to be performed by general Contractor) For additional Sub-Contractors, please add additional sheet(s) 0

Page 1698 of 2548 ends

38 L. IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name:

Title:

Firm Name:

Date:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on Contracts for three years.
x
Danny Cancino President SDC Engineering Inc. 05/20/2024

Page 1699 of 2548 ends

39 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a Contractor with the Department of Industrial Relations.1
Name of Bidder: ________________________________________ DIR Registration Number: ________________________________ DIR Registration Expiration: ______________________________ Small Project Exemption: ______ Yes or ______ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain current DIR registration for the duration of the project.

2. Bidder shall maintain a current DIR registration for the duration of the project.

3. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its Contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

4. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder:

Signature:

Name and Title:

Dated:
1 If the Project is exempt from the Contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.” SDC Engineering Inc. 1000060111 06/30/2026 X
SDC Engineering Inc. Danny Cancino - President 05/17/2024

Page 1700 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 1 ends

ADDENDUM No. 1
CIP 502 – Greenbelt Pedestrian Trail
CIP 604 - City Wide ADA Improvements
CIP 194 – Annual Striping Improvements
DATE: 5/16/2024

TO: All Prospective Bidders
Please note the following changes and/or additions to the Contract Documents, Plans and Specifications, for the project indicated above.

1. Response to Questions
Q: Will a listed subcontractor fulfill the C-8 requirement for this contract and the requirements in the Notice Inviting Bids? Is there a limitation on submitting a prime proposal and sub-proposals to other prime bidders for portions of the work?
A. Yes, a prime contractor with a C-27 license with a subcontractor with a C-8 license will meet the license requirements. The prime contractor must be the one submitting the bid. The prime contractor must complete above 50% of the contract with its own forces.

Q: In the sample contract for the above referenced project, the insurance is asking for Builder’s Risk, $5 million GL and $5 million Auto coverage (see pages 47-50 of the PDF file). However, when you look at the Special Provisions for the project, section 5-4 (pages 94-96 of the PDF), there is no mention of Builder’s Risk, and the insurance limits are $2 million for GL and $1 million for the Auto. Which one is correct? The pricing for insurance is very different depending on the amount and the builder’s risk requirement. Also, there is no mention of whether Umbrella coverage can meet requirements. Is that possible?

Page 1701 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 2 ends

A: For Commercial General Liability, the City will require a $2 Million per occurrence and $4 Million general aggregate policy. For Automobile Liability, the City will require a $1 Million policy. Builder's Risk insurance will not be required. Umbrella coverage may be accepted. The sample contract is amended as a part of this Addendum to reflect those requirements after award of bid.

2. Refer to NOTICE INVITING BIDS
Delete the paragraph:

Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00 PM on MONDAY, MAY 20, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 502 Greenbelt Pedestrian Trail, CIP No. 604 City Wide ADA Improvements, and CIP No. 194 Annual Striping Improvements.

Replace with the following:

Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00 PM on THURSDAY, MAY 23, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 502 Greenbelt Pedestrian Trail, CIP No. 604 City Wide ADA Improvements, and CIP No. 194 Annual Striping Improvements.

Delete the paragraph:

Please submit any questions related to this bid on Planet Bids portal no later than 5:00 PM on MONDAY, MAY 9, 2024.

Replace with the following:

Please submit any questions related to this bid on Planet Bids portal no later than 5:00 PM on MONDAY, MAY 20, 2024.

3. Refer to Part IV – BID DOCUMENTS, B. BID SCHEDULE
The Bid Schedule has been revised to more accurately reflect the Plans.

Delete the original Bid Schedule and replace it with Attachment 1.

Page 1702 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 3 ends

4. Refer to Part IV – BID DOCUMENTS, D. BIDDER’S ASSURANCE Delete the words “bidding schedule” and replace with “Bid Schedule.”

5. Refer to Part IV – BID DOCUMENTS, D. BIDDER’S DECLARATION Remove the phrase:

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule
Replace with the following:

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bid Documents.

6. Refer to Part V – CONTRACT DOCUMENTS, A. CONTRACT AGREEMENT Remove the clause:

INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The Contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications edition, Special Provisions, Exhibits A and B and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said Contract documents are made a part hereof as though fully set forth herein. This Contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these

Page 1703 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 4 ends

Contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

Replace with the following:

INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The Contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications for Public Works Construction 2021 edition, Special Provisions, Exhibits A,B, C, D, and E and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said Contract documents are made a part hereof as though fully set forth herein. This Contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not.

Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these Contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

Remove the clause:

LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in Exhibit “A” for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that may become due CONTRACTOR under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

Replace with the following:

LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in Section 6-9 of the Special Provisions for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that

Page 1704 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 5 ends

may become due CONTRACTOR under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

Under Clause 7, Prevailing Wages and California Labor Laws, delete the paragraphs:

When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
When the number of apprentices in training in the area exceeds a ratio of one to five, or
When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state wide or locally, or Assignment of an apprentice to any work performed under a public works Contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to eight journeymen.

Replace with the following:

When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
When the number of apprentices in training in the area exceeds a ratio of one to five, or
When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state wide or locally, or Assignment of an apprentice to any work performed under a public works Contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

Page 1705 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 6 ends

When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to five journeymen.

Delete Section 17(a)(i):

Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

Replace Section 17(a)(i) with the following:

Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

Delete Section 17(a)(ii):

Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.

Replace Section 17(a)(ii) with the following:

Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $1,000,000 per accident for bodily injury and property damage.

Delete Section 17(a)(iv).

7. Refer to Part V – CONTRACT DOCUMENTS, C. EQUALS
Delete the paragraph:

In accordance with the provisions under General Conditions, entitled EQUALS, If the City shall find any item so described equal to the respective item specified,

Page 1706 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 7 ends

then the undersigned may furnish such item, together with all necessary labor, materials, equipment and incidentals required to perform and complete the work.

Replace with the following:

If the City shall find any item so described equal to the respective item specified, then the undersigned may furnish such item, together with all necessary labor, materials, equipment and incidentals required to perform and complete the work.

8. Refer to PART VI – SPECIAL PROVISIONS
Delete Special Provision Section 2-5.4, Haul Routes:

Haul Routes shall be per the City of Hermosa Beach Truck Routes map. See Cover Sheet on project plans.

Replace Special Provision Section 2-5.4, Haul Routes with the following:

Haul Routes shall be per the City of Hermosa Beach Truck Routes map. See Exhibit E of the Contract Documents.

Under Special Provision Section 3-8, Submittals, delete the bullet:
• Crushed Miscellaneous Base material specifications
Replace it with the following:
• Crushed Aggregate Base material specifications
Under Special Provision Section 3-8, Submittals, delete the bullet:
• Constructions Notices sample template shall be provided by the City to the Contractor and modified and submitted to the engineer for review and approval.

Approved Construction Notice shall be distributed by Contactor. See Exhibit C.

Replace it with the following:
• Constructions Notices sample template shall be provided by the City to the Contractor and modified and submitted to the engineer for review and approval.

Approved Construction Notice shall be distributed by Contactor. See Exhibit B.

Under Special Provision Section 7-6.4, delete the paragraph:

Page 1707 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 8 ends

Payment shall be made at the contract unit price per Cubic Foot (CF), Square Foot (SF), Linear Foot (LF), or Lump Sum (LS) as defined in the bid schedule and shall include furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved, complete and in place, as shown in the Plans and in accordance with the contract documents, unclassified excavation, removal of existing improvements and materials, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction, and finishing. No additional compensation will be allowed therefor.

Replace it with:

Payment shall be made at the contract unit price per Cubic Foot (CF), Square Foot (SF), Linear Foot (LF), or Lump Sum (LS) as defined in the bid schedule and shall include furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved, complete and in place, as shown in the Plans and in accordance with the contract documents, unclassified excavation, removal of existing improvements and materials, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction, and finishing. All quantities shall be based on the volume the existing improvements occupy in situ. No additional compensation will be allowed therefor.

Under Special Provision Section 7-6.20, delete the paragraph:

Payment for Construct 4” Stabilized Decomposed Granite Path shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved in this section, complete and in place, as shown in the Plans and in accordance with the contract documents. No additional compensation will be allowed therefor.

Replace it with the following:

Payment for Construct 4” Stabilized Decomposed Granite Path shall be made at the contract unit price per Square Foot (SF) and shall include all grading adjacent to the path as shown on the Plans and furnishing all labor, materials, tools, equipment, transportation, and incidentals for performing all work involved in this section, complete and in place, as shown in the Plans and in accordance with the contract documents. No additional compensation will be allowed therefor.

Under Special Provision Section 7-6.24 delete the paragraph

Page 1708 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 9 ends

Payment for Install 48” Box Tree, Install 15 Gallon Shrub, Install 5 Gallon Shrub, Install 1 Gallon Shrub, Install Sod, Install Hydroseed, shall be made at the contract unit price per Square Foot (SF) or contract unit price per each and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including unclassified excavation, removal of existing improvements and materials, preparation of subgrade, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction and finishing. No additional compensation will be allowed therefor.

Replace it with the following:

Payment for Install 48” Box Tree, Install 15 Gallon Shrub, Install 5 Gallon Shrub, Install 1 Gallon Shrub, Install Sod, Provide Soil and Fill 2” Below Top of Curb, and Install Hydroseed, shall be made at the contract unit price per Square Foot (SF) or contract unit price per each and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including unclassified excavation, removal of existing improvements and materials, preparation of subgrade, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction and finishing. No additional compensation will be allowed therefor.

Under Special Provision Section 200-1.1 with the following:

Concrete shall be type 520-C-2500 PSI concrete per the City of Hermosa Beach Standard Plans for Public Works No. 106.

Replace it with the following:

Concrete shall be type 520-C-2500 PSI concrete.

Add the following after paragraph four of Special Provision Section 400-5:

Where there is no curb, the lateral distance between the edge of the sign panel and the edge of the nearest travel say shall be a minimum of 6 feet. Where there is a curb, the lateral distance between the edge of the sign panel and the flowline shall be a minimum of 2 feet.

Page 1709 of 2548 ends
Page 1710 of 2548 ends

1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity

Page 11 ends

ACKNOWLEDGEMENT OF ADDENDUM No. 1
CIP 502 – Greenbelt Pedestrian Trail
CIP 604 - City Wide ADA Improvements
CIP 194 – Annual Striping Improvements
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your bid. Failure to do so may result in disqualification of your firm’s bid.

The undersigned acknowledges receipt of Addendum No. 1 dated May 16, 2024.

ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
SDC Engineering Inc. Danny Cancino
24881 Alicia Pkwy Ste E #340, Laguna Hills CA 92653
Principal

Page 1711 of 2548 ends

ADDENDUM NO. 1 – ATTACHMENT 1
B. BID SCHEDULE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-3.4
- $
2 32 LF Remove Existing Curb 7-6.4 $
3 15 LF Remove Existing Curb and
Gutter
7-6.4 $
4 680 SF Remove Existing PCC Sidewalk
and Curb Ramp
7-6.4 $
5 125 SF Remove Existing Pavement
Striping
7-6.4 $
6 1,502 SF Remove Existing AC Pavement 7-6.4 $
7 17,553 CF Remove Existing Wood Chip
Trail
7-6.4 $
8 14,485 SF Clearing and Grubbing 7-6.5 $
9 1 LS
Remove Existing Fitness
Equipment and Associated
Footings
7-6.4
- $
10 6 EA Remove Existing Tree
(Including Stump and Roots)
7-6.6 $
11 1 EA Remove Existing Stump and
Roots
7-6.6 $
12 56 LF Construct 6” Curb 7-6.7 $
13 24 LF Construct 6” PCC Curb and 24”
PCC Gutter
7-6.8 $
14 550 SF Construct 4” PCC Sidewalk 7-6.9 $
15 169 SF Construct 4” PCC Curb Ramp 7-6.10 $
16 87 SF Furnish and Install Detectable
Warning Surface
7-6.11 $

Page 1712 of 2548 ends

Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
17 1502 SF Construct AC Pavement 7-6.12 $
18 2 EA Relocate Existing Sign and
Signpost
7-6.13 $
19 1 EA Furnish and Install Sign Post 7-6.14 $
20 10 EA Furnish and Install Signs 7-6.14 $
21 1 EA Install City Furnished RRFB
Model System on Existing Post
7-6.15 $
22 1 EA Install City Furnished RRFB
Model System on New Post
7-6.15 $
23 0 SF Construct 4’ Ribbon Gutter 7-6.16 $
24 232 LF 4” ADA Parking Striping 7-6.17 $
25 3 EA International Symbol of Access
Pavement Marking
7-6.17 $
26 2 EA “No Parking” Pavement Marking 7-6.17 $
27 20 LF Yield Line Pavement Marking 7-6.17 $
28 120 SF Crosswalk Pavement Marking
(Continental)
7-6.17 $
29 3EA Furnish and Install Wheel Stop 7-6.18 $
30 12 EA Adjust Water Valve to Grade 7-6.19 $
31 1 EA Adjust Backflow System to
Grade
7-6.19 $
32 24,566 SF Construct Stabilized
Decomposed Granite
7-6.20 $
33 346 LF Install Flush Redwood Header 7-6.21 $
34 3,435 LF Install Concealed Redwood
Header
7-6.21 $
35 2 EA Salvage and Reinstall Existing
Memorial Bench
7-6.22 $
36 2 EA Install City Furnished Memorial
Bench
7-6.22 $
37 2 EA Salvage and Reinstall Existing
Trash Can
7-6.22 $
38 2 EA Install City Furnished Fitness
Equipment Set
7-6.22 $
39 160 SF Construct Cast in Place Concrete
Paving for Benches
7-6.23 $

Page 1713 of 2548 ends

(Total Bid in Figures) ______
(Total Bid in Words)
Contractor Name: ______
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of

__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.

Contractor Signature: __________________________________________ Item
No.

Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
40 12 EA Install 48” Box Tree 7-6.24 $
41 14 EA Install 15 Gallon Shrub 7-6.24 $
42 392 EA Install 5 Gallon Shrub 7-6.24 $
43 22 EA Install 1 Gallon Shrub 7-6.24 $
44 2,254 SF Install Sod 7-6.24 $
45 12,324 SF Install Hydroseed 7-6.24 $
46 1 LS Adjust and Install New Existing
Irrigation System
7-6.25 $
47 4 EA Remove Existing Wheel Stops 7-6.4
48 1 EA Adjust Existing Water Fountain
to Grade
7-6.19

49 18 CF Unclassified Excavation 7-6.4
50 915 SF Provide Soil and Fill 2” Below
Top of Curb
7-6.24

Page 1714 of 2548 ends

PW Registration #:

State License #:

Contractor Company Name: __________________________________________ [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
1000060111 986959 SDC Engineering Inc.

Page 1715 of 2548 ends

PALM DR

THE STRAND

VALLEY DR

MANHATTAN AVE

ARDMORE AVE

BAY VIEW DR

PROSPECT AVE

PACIFIC COAST HWY

BEACH DR

MONTEREY BLVD
7TH ST
8TH PL
25TH ST

PIER AVE
10TH ST
5TH ST
6TH ST
2ND ST

HERMOSA AVE
14TH ST
30TH ST

HARPER AVE
31ST ST

GOULD AVE

OCEAN DR
16TH ST
29TH ST
31ST PL
28TH ST
32ND PL

SUNSET DR
30TH PL
17TH ST
33RD ST
29TH CT
33RD PL
ALLEY
28TH CT

LOMA DR
1ST ST
7TH PL
3RD ST

AVIATION BLVD
8TH ST
24TH PL
27TH ST

BOUNDARY PL
9TH ST

OZONE CT
4TH ST
1ST PL

HERONDO ST
24TH ST

LONGFELLOW AVE

ARTESIA BLVD
21ST ST
13TH ST
26TH ST
15TH ST
19TH ST OWOSSO AVE
34TH ST

RHODES ST
11TH ST
20TH ST
OAK ST

INGLESIDE DR
20TH PL

BARD ST

PARK AVE

REYNOLDS LN

MYRTLE AVE
22ND ST

GENTRY ST

HILLCREST DR

POWER ST
35TH PL

GOULD TER
1ST CT
17TH CT
18TH CT
16TH CT
18TH ST
15TH PL
19TH CT
11TH PL
14TH CT

CYPRESS AVE
13TH CT

VALLEY PARK AVE
9TH CT

CIRCLE DR
11TH CT
15TH CT
12TH CT
20TH CT
10TH CT

GOLDEN AVE

CULPER CT
6TH CT

SILVER ST
21ST CT

MASSEY AVE

MEYER CT

HILL ST
5TH CT

SPRINGFIELD AVE
4TH CT

OCEAN VIEW AVE
23RD ST
3RD CT

AMBY PL

HARPER LN

MARLITA PL
13TH ST
5TH ST
25TH ST
24TH ST
21ST ST
1ST ST
21ST ST
11TH ST
9TH ST
1ST ST
20TH ST

CYPRESS AVE
3RD ST
7TH ST 7TH ST
1ST ST

BEACH DR
4TH ST
26TH ST
18TH ST
24TH ST
30TH ST
16TH ST
20TH ST
10TH ST
15TH ST
11TH ST
18TH ST
17TH ST
OAK ST
4TH ST
9TH ST
11TH PL
2ND ST

LOMA DR
6TH ST
10TH ST
19TH ST
ALLEY
1ST PL
34TH ST
24TH PL
14TH ST

LOMA DR
3RD ST
4TH ST
11TH ST
ALLEY
24TH ST
1ST ST
8TH ST
6TH ST
19TH ST
City of Hermosa Beach
Truck Routes
"2015"
ATTACHMENT 2

Page 1716 of 2548 ends

LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK C LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK DEMO LEGEND SYMBOL DESCRIPTION QTY. DEMO PLAN NOTES GENERAL DEMOLITION NOTES: GENERAL DEMOLITION NOTES: 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 D-01 0 10' 20' 1" = 20' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 04 N.I.C NOT IN CONTRACT REMOVE 4-30-24 8 PER PLAN PER PLAN 10 ADDENDUM NO. 1 05/16/24 Page 1717 of 2548 05 N.I.CNOT IN CONTRACT
4-30-24
17' 01 ADDENDUM NO. 1 05/16/24

Page 1718 of 2548 ends

EXHIBIT B

Page 1719 of 2548 ends
Page 1720 of 2548 ends
Page 1721 of 2548 ends
Page 1722 of 2548 ends
Page 1723 of 2548 ends
Page 1724 of 2548 ends
Page 1725 of 2548 ends
Page 1726 of 2548 ends
Page 1727 of 2548 ends
Page 1728 of 2548 ends
Page 1729 of 2548 ends
Page 1730 of 2548 ends
Page 1731 of 2548 ends
Page 1732 of 2548 ends
Page 1733 of 2548 ends
Page 1734 of 2548 ends
Page 1735 of 2548 ends
Page 1736 of 2548 ends
Page 1737 of 2548 ends
Page 1738 of 2548 ends
Page 1739 of 2548 ends
Page 1740 of 2548 ends
Page 1741 of 2548 ends
Page 1742 of 2548 ends
Page 1743 of 2548 ends

EXHIBIT C

Page 1744 of 2548 ends

18 IV. BID DOCUMENTS
A. PROPOSAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
CONTRACTOR: Date: ___________________
TO: City of Hermosa Beach
Honorable Mayor and Members of the City Council City Hall Hermosa Beach, California, 90254
Ladies and Gentlemen:

The undersigned declares that he/she has carefully examined the location of the proposed work and that he/she has examined the Plans and Specifications, has read the Contract Documents, and hereby agrees to furnish all labor, materials, equipment, tools, transportation, and services to do all work required for:

CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In accordance with the Plans and Specifications prepared by the Engineer, in accordance with the Special Provisions, the Contract Documents, and in accordance with the Standard Specifications for Public Works Construction 2021, Unified Building Code for Construction (current edition) (except Sections 1-9), and the requirements of the Engineer under said documents, for the prices shown herein.

The Contractor also certifies that they are registered with the Department of Industrial Relations.

All work shall be completed within 50 working days from the date the Notice to Proceed is issued by the Engineer.

Contractor Signature PWCR Registration Number
Gentry General Engineering, Inc. May 20, 2024
1000024189

Page 1745 of 2548 ends

320 W. Tropica Rancho Road Colton, CA 92324
President
Gentry General Engineering, Inc
Brenton Gentry

Page 1746 of 2548 ends

45,000.00
45,000.00

27.00 864.00

52.00 780.00

10.75 7,310.00

44.00 5,500.00

13.00 19,526.00

8.00 140,424.00

9.00 130,365.00
1,280.00
1,280.00
1,600.00 9,600.00
719.00 719.00

40.00 2,240.00

41.00 984.00

8.60 4,730.00

19.00 3,211.00

99.00 8,613.00

Page 1747 of 2548 ends

20.00 30,040.00
467.00 934.00
941.00 941.00
311.00 3,110.00
4,200.00 4,200.00
12,700.00 12,700.00

25.00 5,800.00
479.00 1,437.00
431.00 862.00

48.00 960.00

40.00 4,800.00
347.00 1,041.00
861.00 10,332.00
7,400.00 7,400.00

8.00 196,528.00

6.00 2,076.00

6.25 21,468.75
1,200.00 2,400.00
862.00 1,724.00
1,200.00 2,400.00
8,200.00 16,400.00

36.00 5,760.00

Page 1748 of 2548 ends

Gentry General Engineering, Inc
10%
3,600.00 43,200.00
158.00 2,212.00

52.00 20,384.00

19.00 418.00

4.00 9,016.00

2.00 24,648.00
131,000.00 131,000.00
445.00 $ 1,780.00
6,700.00 $ 6,700.00
103.00 $ 1,854.00

6.60 $ 6,039.00
$961, 710.75
Nine hundred sixty-one thousand seven hundred ten dollars and seventy-five cents

Page 1749 of 2548 ends

1000024189
974279
Gentry General Engineering, Inc

Page 1750 of 2548 ends
Page 1751 of 2548 ends
Page 1752 of 2548 ends
Page 1753 of 2548 ends
Page 1754 of 2548 ends
Page 1755 of 2548 ends
Page 1756 of 2548 ends

26 D. BIDDER'S ASSURANCE
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
FROM:

Name of Bidder:

Business Address:

Telephone No:

TO:

Members of the City Council
c/o City Hall
City of Hermosa Beach, California
Members of the City Council:

Pursuant to your published Notice Inviting Bids for: CIP NO. 502 GREENBELT PEDESTRIAN TRAIL, CIP NO. 604 CITY WIDE ADA IMPROVEMENTS, AND CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares that he/she has carefully examined the location of the proposed work; that he/she has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders and hereby proposes to furnish all materials, machinery, tools, labor, and services and do all the work necessary to complete the project in accordance with said Plans and Specifications and other Contract Documents at the item prices on the bidding schedule.

BY: TITLE:

Gentry General Engineering, Inc.
320 W. Tropica Rancho Rd.

Colton CA 92324
909.330.1128
Brenton Gentry President/CEO

Page 1757 of 2548 ends

27 E. BIDDER'S DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
It is understood and agreed that:

1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, Warranty Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.

2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.

3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.

4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.

The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.

5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other Bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding.

6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the Owner after evaluation of the bids as submitted. The undersigned agrees that the Owner shall recover or retain as liquidated damages an amount equal to the difference between the low bid and amount of the bid of the Bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest Bidder in accordance with the provisions of the Public Contract Code section 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.

Page 1758 of 2548 ends

28 7. This bid will not be withdrawn within a period of ninety (90) days after the date of its proper opening by the City.

8. The undersigned Bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.

Respectfully submitted,
Contractor's Business Name Contractor Signature Title
Business Address: Street By Title
City State Zip Contractor's License No. and
Classification
Business Phone Number Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the Bidder, whose address must be given: if it is made by a firm, it must be signed in the co-partnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.

Gentry General Engineering, Inc.
320 W Tropica Rancho Rd.

Colton CA 92324
909.330.1128
Brenton Gentry President/CEO
Colton CA 92324
President/CEO
Brenton Gentry President/CEO
#974279 Class A
May 20, 2024
13435 Arrow Blvd. Fontana CA
909.330.1128

Page 1759 of 2548 ends
Page 1760 of 2548 ends

29 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.

We agree specifically:

1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.

2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.

3. To take affirmative steps to hire minority employees within the company.

FIRM

TITLE OF PERSON SIGNING

SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:

Gentry General Engineering, Inc.

President/CEO
May 20, 2024

Page 1761 of 2548 ends

30 G. CERTIFICATION OF PRINCIPAL
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.) Signature:

Name:

Title:

Name of Company:

Brenton Gentry
President/CEO
Gentry General Engineering, Inc.

Page 1762 of 2548 ends

31 H. DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned, a duly authorized representative of the Contractor, certifies and declares that:

1. The undersigned Contractor is aware of Section 1771.1 and 1777.7 of the California Labor Code, which prohibit a Contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The undersigned Contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The undersigned Contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a Contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a Contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.”
“(b) Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract, and any public money that may have been paid to a debarred subcontractor by a Contractor on the project shall be returned to the awarding body. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”

4. The undersigned Contractor has investigated the eligibility of each and every subcontractor the undersigned Contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, at (place of execution), California.

Signature:

Name:

Title:

Name of Company:
20th May
Colton
Brenton Gentry
President/CEO
Gentry General Engineering, Inc.

Page 1763 of 2548 ends
Page 1764 of 2548 ends

32 I. NON-COLLUSION DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares:

I am the ___________________ of ______________________________, the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on __________ [date], at ___________________ [city], ___________________ [state].

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP
President/CEO Gentry General Engineering, Inc.

May 20, 204
Colton California
Gentry General Engineering, Inc.
320 W Tropica Rancho Rd.

Colotn CA 92324

Page 1765 of 2548 ends
Page 1766 of 2548 ends

33 J. REFERENCES OF WORK
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
Provide names, addresses, phone numbers and email addresses for at least three public agencies for which Bidder has performed similar work within the past five years.

All contact information must be current.

1. _______________________________________________________________________ Name and Address of Public Agency _________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion Number of Change Orders ____________

2.______________________________________________________________________ Name and Address of Public Agency _________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion Please see attached

Page 1767 of 2548 ends

34 Number of Change Orders ____________

3.________________________________________________________________________ Name and Address of Public Agency _________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project ___________________________________ ___________________________________ Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion Number of Change Orders ____________
For additional References, please add separate sheets.

NAME OF BIDDER

SIGNATURE OF BIDDER DATE
Gentry General Engineering, Inc.

May 20, 2024

Page 1768 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
Prior Projects
2013 – $34,500.00
City of Fontana
Damaged Street/Sidewalk
Asphalt & Concrete R&R
8353 Sierra Ave
Fontana, Ca 92335
Jason Jojola: No Email Address
909.350.6636
2014 – $30,000.00
City of Rancho Cucamonga
Solar Shade Structure
8794 Lion St.

Rancho Cucamonga, Ca 91730
909.477.2730 (No Email Address)
2015 – $495,000
City of Whittier
Fire Loop/Fire Sprinkler Repair
9401Painter Ave
Whittier, Ca 90605
Karla Embry: [email protected] 562.332.9303
2015 – $41,000
City of Glendora
Water Improvement
116 E. Foothill Blvd.

Glendora, Ca 91741
Carlos Cigneros: No Email Address
626.786.1285
2016 – $504,420
City of Baldwin Park
Alleyway Street/Sidewalk
Asphalt & Concrete R&R
14403 Pacific Ave
Baldwin Park, Ca 91706
Chase Fidler: [email protected]
626.960.4011
2016 – $619,075
City of Bloomington
ADA Ramp – Repair/Maintenance/Replaced
825 E. 3rd Street
San Bernardino, CA 92415
Haile Ford: [email protected]
909.387.7936
2016 – $173,604
City of Montclair
Alleyway Street/Sidewalk Asphalt & Concrete
5111 Benito St
Montclair, Ca 91763
Steve Stanton: [email protected]
909.625.9444
2017 – $325,000
City of Upland
Damaged Street/Sidewalk
Asphalt & Concrete R&R
1370 North Benson Ave
Upland, Ca 91785
Tony Trejo: [email protected] 909.631.3918

Page 1769 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2017 – $624,688
Santa Ana
Repair Maintenance/Replaced
Damaged Street/Sidewalk
Asphalt & Concrete R&R
20 Civic Center Plaza
Santa Ana, Ca 92701
Victor So: [email protected]
714.647.5076
2017 – $694,000
City of Corona
Miscellaneous Concrete Repair
400 S. Vicentia Ave, Ste. 210
Corona, Ca 92882
Barry Ghaemi: [email protected] 951.739.4961
2017 – $30,000
City of San Diego
Demo/Backfill/Compact Existing
Vault Location
422 W. Washington St.

San Diego, Ca 92103
Matt Cavan: [email protected]
951.684.1909
2018 – $1.2 Million
City of Torrance
Damaged Street/Sidewalk
Asphalt & Concrete R&R
20500 Madrona Ave
Torrance, Ca 90503
Shin Furukawa: [email protected]
310.618.3073
2018 – $547,950
City of Pasadena
Miscellaneous Concrete Repair
100 Garfield Ave
Pasadena, Ca 91101
Morley Saralya: [email protected]
626.744.3703
2018 – $2.2 Million
City of Torrance
Downtown Torrance Active Transportation
Improvements
20500 Madrona Ave
Torrance, Ca 90503
Justin Gatza: [email protected]
310.618.3032
2019 – $288,974
City of Barstow
Water Treatment Plant Dewatering Pad & Wall
2200 Riverside Dr.

Barstow, Ca 92311
Kody Topkins: [email protected]
760.252.2538
2019 - $544,342
Torrance Unified School District
Anza, Arnold and Hickory ES Site Drainage
21400 Ellinwood Dr
Torrance, CA 90503
Joe Winterburn:
[email protected]
(949) 502-4000
2019 - $714,000
City of Hermosa Beach
8 th Street Improvements Project
8 th Street
Hermosa Beach, CA 90254
Reed Salan: [email protected]
(310) 318-0229

Page 1770 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2019 - $267,000
Costa Mesa Sanitary District
Indus Sewer Main Replacement
20122 Santa Ana Ave
Newport Beach, CA 92660
Rob Hamers: [email protected]
(949) 548-1192
2019 - $285,744
City of Fullerton
Curb/Gutter and Sidewalk Reconstruction
Fullerton, CA 92831
Jose Medina: [email protected]
(714) 738-6863
2019 - $141,312 ($139,573 original bid; work
limits increased)
City of Irvine
Ranch Park Bike Trail Rehabilitation
Irvine, CA 92618
Anthony Caraveo: [email protected]
(949) 724-7365
2019 - $644,763
City of Thousand Oaks
Concrete Replacement and Sidewalk Repair
Program
Thousand Oaks, CA 91320
Michelle McCarty: [email protected]
(805) 449-2477
2019 - $14,800.00
Whittier Unified School District (Whittier CHS)
Refurbish Long Jump Pits
9401 S. Painter Ave.,
Whittier, CA 90605
Danny True –
[email protected]
(562) 237-0795
2019 - $210,000
Lynwood Middle School (USD)
Storm Drain Improvements
11321 Bullis Road
Lynwood, CA 90262
Manuel Jaramillo: [email protected]
(323)447-0996
2020 - $1,369,000
City of Torrance
Sidewalk Repair for Handicap Accessibility
Torrance, CA 90505
Shin Furukawa: [email protected]
(310) 781-6900
2020 - $19,546
City of Fontana
San Bernardino at Cypress Driveway
Improvements
Fontana, CA 92335
Christopher Smethurst:
[email protected]
(909) 350-6649
2020 - $158,338 ($149,835 original bid;
additional grading work performed)
City of Walnut
Butterfield Park Trail Rehabilitation
21201 La Puente Rd
Walnut, CA 91789
Tony Lopez: [email protected]
(909) 594-9702

Page 1771 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2020 - $29,820
City of Irwindale
Peppertree Bus Shelter Removal and Foothill
Column
5050 N Irwindale Ave
Irwindale, CA 91706
Elizabeth Rodriguez –
[email protected]
(626) 430-2211
2020 - $5,565
City of Irwindale
Arrow Bus Shelter Roof Repair
5050 N Irwindale Ave
Irwindale, CA 91706
Elizabeth Rodriguez –
[email protected]
(626) 430-2211
2021 - $22,000
Whittier Unified School District
Collapsed Storm Drain Repair
9401 S. Painter Ave.,
Whittier, CA 90605
Danny True –
[email protected]
(562) 237-0795
2021 - $29,999
Costa Mesa Sanitary District
Manhole Surface Repairs Phase 7
290 Paularino Ave
Costa Mesa, CA 92626
Michael Benesh –
[email protected]
(949) 548-1192
2021 - $366,732
City of Laguna Beach
Zones 2 and 3 Street Concrete Improvements
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729
2021 – $221,318 ($211,965 original bid; extra
work added)
City of Laguna Beach
Ramona Alley Decorative Paving Replacement
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729
2021 - $198,420
Chino Valley Unified School District
Briggs K-8 Waterline Upgrades
11880 Roswell Ave
Chino, CA 91710
Sam Sousa –
[email protected]
(909) 628-1201 x1490
2021 - $125,400
Torrance Unified School District
Seaside Elementary Site Drainage Improvement
2335 Plaza Del Amo
Torrance, CA 90501
Ryan Palmer –
[email protected]
(310) 972-6240

Page 1772 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2021 - $252,796
City of Rancho Cucamonga
Citywide Concrete Repair
10500 Civic Center Dr
Rancho Cucamonga, CA 91730
Ernie Ruiz –
[email protected]
(909) 774-4108
2021 - $41,750
State of California
Moro State Deck and ADA Access
715 P Street
Sacramento, CA 94296
Michelle Humphrey –
[email protected]
(949) 366-8533
2021 - $1,924,055
City of Anaheim
Alley Sanitary Sewer Improvement
200 S Anaheim Blvd
Anaheim, CA 92805
Scott Yanagihara –
[email protected]
(714) 231-4696
2022 - $9,010,551 ($8,449,000 original bid;
plans/specs revised post-award)
State of California
Doheny State Beach Projects A, B and C
715 P Street
Sacramento, CA 95832
Ryan McBride –
[email protected]
(714) 833-1792
2022 - $88,066
Cucamonga Valley Water District
Nitrate Facility Retaining Wall
10440 Ashford St
Rancho Cucamonga, CA 91730
Tyler Bui –
[email protected]
(909) 483-7455
2022 - $148,029
County of San Bernardino
Laurel Ave/Randall Ave Drainage Improvement
825 E 3rd St
San Bernardino, CA 92415
Carlos Seanez –
[email protected]
(909) 486-0227
2022 – $98,050
City of Laguna Beach
Citywide Guardrails
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729
2022 - $121,318 ($111,000 original bid; work
limits extended)
City of Orange
Chapman Ave Alley Improvement
300 E Chapman Ave
Orange, CA 92866
Karl Schmidt –
[email protected]
(714) 744-5562

Page 1773 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2022 - $1,085,610.50
City of Torrance
Citywide Sidewalk Repair for Disabled
Accessibility
3031 Torrance Blvd
Torrance, CA 90503
Marc Simons –
[email protected]
(424) 399-3193
2022 - $7,997
City of Rancho Cucamonga
Citywide Fence Repair
8794 Lion St
Rancho Cucamonga, CA 91730
Phillip Ortega –
[email protected]
(909) 477-2730
2022 - $206,496 ($200,010 original bid; design
revisions)
City of El Segundo
W Mariposa Ave and W Pine Ave Sidewalk
Construction
350 Main St
El Segundo, CA 90245
Floriza Rivera –
[email protected]
(310) 524-2361
2022 - $413,420
Temecula Valley Unified School District
Vintage Hills Elementary School Modernization
31350 Rancho Vista Rd
Temecula, CA 92592
Jim Flath –
[email protected]
(951) 501-9594
2022 - $5,700
City of Rancho Cucamonga
Way Finder Monument Sign Replacement
8794 Lion St
Rancho Cucamonga, CA 91730
Phillip Ortega –
[email protected]
(909) 477-2730
2022 - $426,472 ($508,372 original bid; some
bid schedule items deleted from work)
County of San Bernardino
Ridgecrest Rd Sidewalk and Ramps
825 E 3rd St
San Bernardino, CA 92415
Carlos Seanez –
[email protected]
(909) 486-0227
2022 - $48,606
City of Rancho Cucamonga
Calle Carabe Sidewalk Repair
8794 Lion St
Rancho Cucamonga, CA 91730
Richard Favela –
[email protected]
(909) 774-4107
2022 – $128,695
City of Laguna Beach
Peppertree Parking Lot Rehabilitation
505 Forest Ave
Laguna Beach, CA 92651
Alpha Santos-Guinto –
[email protected]
(949) 497-0729

Page 1774 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2022 - $529,424 ($489,075 bid value;
quantities/limits increased)
City of El Monte
Sidewalk and Curb Ramp Reconstruction
11333 Valley Blvd
El Monte, CA 91731
John Rico –
[email protected]
(626) 258-8833
2022 - $47,522 ($44,236 bid value; additional
signage added to scope)
City of El Monte
City Hall Parking Lot ADA Improvements
11333 Valley Blvd
El Monte, CA 91731
Kevin Ko –
[email protected]
(626) 580-2058
2022 - $142,591
City of Rancho Cucamonga
Heritage Community Park Pedestrian Trail
Rehabilitation
8794 Lion St
Rancho Cucamonga, CA 91730
Richard Favela –
[email protected]
(909) 774-4107
2022 - $15,600
City of Rancho Cucamonga
Carnelian Block Wall Repair
8794 Lion St
Rancho Cucamonga, CA 91730
Richard Favela –
[email protected]
(909) 774-4107
2022 - $8,922
City of Rancho Cucamonga
Guardrail Replacement at Woodruff and
Highland
8794 Lion St
Rancho Cucamonga, CA 91730
Phillip Ortega –
[email protected]
(909) 477-2730
2022 – $176,450 ($138,925 bid value;
limits/quantities increased)
City of Orange
Chapman and Yorba Sidewalk Construction
300 E Chapman Ave
Orange, CA 92866
Eric Perez –
[email protected]
(714) 744-4107
2022 - $109,208 ($99,420 bid value; scope of
work increased
City of Rancho Cucamonga
Construction of Pickleball Courts at Redhill Park
8794 Lion St
Rancho Cucamonga, CA 91730
Jenny Hanlon –
[email protected]
(909) 774-2343
2022 - $181,909.90 (original bid $186,155;
actual quantities less than bid schedule)
County of San Bernardino
City Creek Guardrails
825 E 3rd St
San Bernardino, CA 92415
Carlos Seanez –
[email protected]
(909) 486-0227

Page 1775 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2022 - $240,528 ($233,440.68 bid value; limits
extended)
City of Fontana
Foothill-Alder Curb Ramp
8353 Sierra Ave
Fontana, CA 92335
Estephany Monroy
[email protected]
(909) 350-6642
2023 - $163,771.34 ($200,000 bid value; on-call
contract)
City of Laguna Niguel
Citywide Concrete Infrastructure Repair
30111 Crown Valley Pkwy
Laguna Niguel, CA 92677
Jeff Metz
[email protected]
(949) 362-4344
2023 - $281,019 ($207,793 bid value; locations
added and scope of work increased)
City of Hermosa Beach
Prospect Ave Curb Ramps, Longfellow Sidewalk
Improvements and ADA Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $646,577.87 (original bid $552,252)
City of Downey
Annual Miscellaneous Concrete Repairs
11111 Brookshire Ave
Downey, CA 90241
Brian Aleman –
[email protected]
(562) 904-7110
2022 - $101,192.76
City of Rancho Cucamonga
Emergency Trail Repairs
8794 Lion St
Rancho Cucamonga, CA 91730
Sonny Rodriguez –
[email protected]
(909) 477-2730
2023 - $46,793.44
City of Hermosa Beach
Clark Field Restroom Plumbing Upgrades and
Site Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $26,800.00
City of Hermosa Beach
South Park Restroom Plumbing Upgrades and
Site Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $2,664,896.83 (original bid
$2,696,271.90; actual quantities less than bid
schedule)
City of Upland
17th St Water Main Replacement and Street
Rehabilitation
460 N Euclid Ave
Upland, CA 91786
Kirk Swanner –
[email protected]
(909) 291-2938

Page 1776 of 2548 ends

320 W Tropica Rancho Rd
Colton, CA 92324
off: 909.330.1128
fax: 909.330.1129
[email protected]
2023 - $206,328.96 (original bid $194,031;
locations added to scope)
City of Hermosa Beach
City Sidewalk Improvements
1315 Valley Dr
Hermosa Beach, CA 90254
Jonathan Pascual –
[email protected]
(310) 318-0252
2023 - $298,889 (original bid $194,500;
significant redesigns and scope increases)
City of South Gate
Citywide Valve Replacement
8650 California Ave
South Gate, CA 90280
Ana Ananda –
[email protected]
(323) 563-5769

Page 1777 of 2548 ends

35 K. SUBCONTRACTORS LIST
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Government Code of the State of California, and any amendments thereto, each Bidder shall set forth below: (a) the name and location of the place of business, (b) the California Contractor license number, (c) the DIR public works Contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime Contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

If the Contractor fails to specify a subcontractor for any portion of the work to be performed under the Contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.

We propose to use the following listed subcontractors as per Public Contract Code Section 4100 et seq.: List all Subcontractors. The subcontractor shall be licensed for the type of work they are performing.

Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
V&E Tree Service PO Box 3280, Orange, CA 92865
654506 1000001936
(714) 997-0903 $30,700
tree and stump trimming and removal, arborist services if required 3%

Page 1778 of 2548 ends

36 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Marina Landscape, Inc 3707 W Garden Grove Blvd, Orange, CA 92868 landscape, irrigation, redwood header, and decomposed granite 492862 1000000079
(714) 939-6600 $358,566
Chrisp Company 43650 Osgood Rd, Fremont, CA 94539
striping, RRFB installation and signs
374600 1000000306
(510) 656-2840 $35,498
37%
3%

Page 1779 of 2548 ends

37 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License NO. DIR Registration NO.

Phone NO. Dollar Amount of Work & % of Work
Percent of work to be performed by sub-Contractors: %
(Note: 50% of work is required to be performed by general Contractor) For additional Sub-Contractors, please add additional sheet(s) 43%

Page 1780 of 2548 ends

38 L. IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name:

Title:

Firm Name:

Date:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on Contracts for three years.

Brenton Gentry
President/CEO
Gentry General Engineering, Inc.

May 20, 2024

Page 1781 of 2548 ends
Page 1782 of 2548 ends

39 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a Contractor with the Department of Industrial Relations.1
Name of Bidder: ________________________________________ DIR Registration Number: ________________________________ DIR Registration Expiration: ______________________________ Small Project Exemption: ______ Yes or ______ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain current DIR registration for the duration of the project.

2. Bidder shall maintain a current DIR registration for the duration of the project.

3. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its Contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

4. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder:

Signature:

Name and Title:

Dated: 1
If the Project is exempt from the Contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.” Gentry General Engineering, Inc.
1000024189
06/30/2025
X
Gentry General Engineering, Inc.

Brenton Gentry - President/CEO
May 20, 2024

Page 1783 of 2548 ends

EXHIBIT D

Page 1784 of 2548 ends

Gentry General Engineering, Inc
320 W Tropica Rancho Rd
Colton, CA 92324
(909) 330-1128
BID 24-002
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL, CIP NO. 604 CITY WIDE ADA IMPROVEMENTS, & CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS To whom it may concern,
I am writing to protest the proposals submitted on May 23, 2024 by SDC Engineering Inc and Cook Development Group, Inc. for the CIP 502 Greenbelt Pedestrian Trail, CIP 604 City Wide ADA Improvements, and CIP 194 Annual Striping Improvements projects. It is our assessment that the aforementioned bidders are nonresponsive/nonresponsible on the following grounds:

Section III: Instruction to Bidders mandates (page 9) that "the proposal shall be fully executed and submitted on the forms provided by the City" and that Form I: Non-Collusion Declaration "shall be signed and returned to the City with the Bid Proposal." Section III:

Instruction to Bidders goes on to clarify (page 12) that "the award of contract, if it be awarded, will be to the lowest responsible Bidder whose proposal complies with all of the requirements prescribed." Having failed to sign and return Form I: Non-Collusion Declaration with their bid proposals, neither SDC Engineering Inc nor Cook Development Group, Inc can be considered the "lowest responsible bidder whose proposal complies with all of the requirements prescribed," and must both be found nonresponsible.

It is worth noting that a non-collusion declaration constitutes far more than a mere formality; rather, it is a fundamental and indispensable element of any fair public bid. Failure to execute a non-collusion declaration is not a minor oversight, but a universally disqualifying offense. The City's own specification subsection "Disqualification of Bidders" (page 12) concurs, specifically listing any "reason for believing that collusion exists" as grounds for a proposal's rejection.

Thank you,
Brenton Gentry - President, Gentry General Engineering, Inc

Page 1785 of 2548 ends

EXHIBIT E

Page 1786 of 2548 ends

32 I. NON-COLLUSION DECLARATION
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
The undersigned declares:

I am the ___________________ of ______________________________, the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on __________ [date], at ___________________ [city], ___________________ [state].

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP
President SDC Engineering Inc. SDC Engineering Inc.
24881 Alicia Pkwy Ste E #340

Laguna Hills, CA 92653 5/17/2024 Laguna Hills California

Page 1787 of 2548 ends

EXHIBIT F

Page 1788 of 2548 ends

5/21/24
Irvine CA

Page 1789 of 2548 ends

EXHIBIT G

Page 1790 of 2548 ends
Page 1791 of 2548 ends
Page 1792 of 2548 ends
Page 1793 of 2548 ends
Page 1794 of 2548 ends
Page 1795 of 2548 ends
Page 1796 of 2548 ends
Page 1797 of 2548 ends
Page 1798 of 2548 ends
Page 1799 of 2548 ends
Page 1800 of 2548 ends
Page 1801 of 2548 ends
Page 1802 of 2548 ends
Page 1803 of 2548 ends
Page 1804 of 2548 ends
Page 1805 of 2548 ends
Page 1806 of 2548 ends
Page 1807 of 2548 ends
Page 1808 of 2548 ends

NO PARKING NO PARKING LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 G-00 0 20' 40' 1" = 40' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N C I T Y O F H E R M O S A B E A C H , C A 1 9 0 N7 C I T Y O F H E R M O S A B E A C H , C A 1 9 0 N7 04/10/2024 04/10/2024 01 4-30-24 Page 1809 of 2548 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 G-01 “ ” ’ ’ ’ ’ “ ” ’ ” ” – ’ “ ” ’ ’ 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 02 4-30-24 Page 1810 of 2548 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 G-02 ---- ’ ’ ’ John Vlassis, P.

John Vlassis, P
John Vlassis, P.E. 49Senior Project Manag
John Vlassis, P.E. 498Senior Project Manag
John Vlassis, P.E. 49
John Vlassis, P.E. 498Senior Project Manag
John Vlassis, P.E. 498 4/11/24 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 03 4-30-24 Page 1811 of 2548 LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK C LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK DEMO LEGEND SYMBOL DESCRIPTION QTY. DEMO PLAN NOTES GENERAL DEMOLITION NOTES: GENERAL DEMOLITION NOTES: 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 D-01 0 10' 20' 1" = 20' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 04 N.I.C NOT IN CONTRACT REMOVE 4-30-24 8 PER PLAN PER PLAN Page 1812 of 2548 05 N.I.CNOT IN CONTRACT
4-30-24
17'

Page 1813 of 2548 ends

LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK NO PARKING NO PARKING LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK TREE PROTECTION KEY SYMBOL DESCRIPTION QTY. NOTES: 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 D-03 ---- 0 10' 20' 1" = 20' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 06 REMOVE 4-30-24 Page 1814 of 2548 Line Table Line Table Line Table 07 N.I.C NOT IN CONTRACT 4-30-24 Page 1815 of 2548 Line Table Line Table Line Table 4-30-24
08

Page 1816 of 2548 ends

Line Table Line Table Line Table 09 4-30-24 Page 1817 of 2548 4-30-24

Page 1818 of 2548 ends

NO PARKING NO PARKING E F H A 11 0 N.I.C NOT IN CONTRACT 4-30-24 Page 1819 of 2548 12 4-30-24

Page 1820 of 2548 ends

NO PARKING NO PARKING 13 N.I.C NOT IN CONTRACT ON BOTH SIDES OF CROSSWALK (TOTAL QUANTITY: 2) 4-30-24 Page 1821 of 2548 14 4-30-24

Page 1822 of 2548 ends

LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK NO PARKING NO PARKING LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LAYOUT LEGEND SYMBOL KEY DESCRIPTION MATERIAL SYMBOL DESCRIPTION MATERIALS SCHEDULE (P) CONTINUED SYMBOL KEY DESCRIPTION MATERIAL SUPPLIER QTY COLOR FINISH REMARK DETAIL MATERIALS SCHEDULE (P) SUPPLIER QTY COLOR FINISH REMARK DETAIL 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 L-01 0 10' 20' 1" = 20' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 04/10/2024 04/10/2024 15 N.I.C NOT IN CONTRACT CONTRACTOR TO REMOVE, CLEAN, AND RE-INSTALL ON NEW CONCRETE PAD 4-30-24 Page 1823 of 2548 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 04/10/24 L-02 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 16 COLOR: CALIFORNIA GOLD 4-30-24 Page 1824 of 2548 SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME BDPER RCAAR AE AF SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME PPPAAR AAR AAR AE AAR AE AE AE AE AE AE AE SM SM SM SM SM SM SM SM SMSM SM SMSMSM B BBBB B B B B B B B B B B B B B BBBBB BBB B B B B B B B B B B B B B B B BBBBB B B B B B B BB B B B B B B B B B B B B B B B B B B B B B B BBBB B BBBBBBBB BBBB B BB BBB B B B B B BB B B B B B B B B B B B B B B B B BB B B B LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK PPPAAR AAR AAR AE AAR AE AE AE AE AE AE AE SM SM SM SM SM SM SM SM SMSM SM SMSMSM B BBBB B B B B B B B B B B B B B BBBBB BBB B B B B B B B B B B B B B B B BBBBB B B B B B B BB B B B B B B B B B B B B B B B B B B B B B B BBBB B BBBBBBBB BBBB B BB BBB B B B B B BB B B B B B B B B B B B B B B B B BB B B B LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK RC RC RC RC RC D D D D D D D D D D D D D D D D D D D D D D D RC RC RC RC RC RC RC P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P D D RC RC P P P P ER ER ER ER ER P P P P ER ER ER P P D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D ER D ER ER ER ER ER ER P P P P P P P P P P P P P P P P P P P BBB B B B B B B B B B B B D D D D D D ER ERER ERER D D D DER ERER ER ER ER BB B B B B B BB B B B B B B B AF AF AF AF AF D DD D DD AF AF AF AF D AF DD AF AF AF AF D AF DD AF AF AF AF AF AF AF AFAF AFAF AF AF AFDDDAF AF AF AF AF AF DDDAF AF AF AF AF DDDAF AF AF AF AF DDD LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK NO PARKING NO PARKING RC RC RC RC RC D D D D D D D D D D D D D D D D D D D D D D D RC RC RC RC RC RC RC P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P D D RC RC P P P P ER ER ER ER ER P P P P ER ER ER P P D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D ER D ER ER ER ER ER ER P P P P P P P P P P P P P P P P P P P BBB B B B B B B B B B B B D D D D D D ER ERER ERER D D D DER ERER ER ER ER BB B B B B B BB B B B B B B B AF AF AF AF AF D DD D DD AF AF AF AF D AF DD AF AF AF AF D AF DD AF AF AF AF AF AF AF AFAF AFAF AF AF AFDDDAF AF AF AF AF AF DDDAF AF AF AF AF DDDAF AF AF AF AF DDD LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK SM SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 BACCARISH PILULARIS 'PIGEON POINT' 5 GAL DIANELLA REVOLUTA 'LITTLE REV' 5 GAL EUPHROBIA RIGIDA 5 GAL RHAMNUS CALIFORNICA 'EVE CASE' 15 GAL PITTOSPORUM CRASSIFOLIUM 'COMPACTUM' 5 GAL 0 10' 20' 1" = 20' I C Y T O F H E R M O S A B E A C H , C A 1 9 0 7 N L-03 PLANTING LEGEND TREE LEGEND AOENIUM 'SUNBURST' 1 GAL AGAVE 'RAY OF LIGHT' 5 GAL SENECIO MANDRALISCAE 1 GAL PLANTING LEGEND (CONTINUED) HYDROSEED LEGEND ANIGOZANTHUS 'YELLOW GEM' 5 GAL 04/10/2024 04/10/2024 17 N.I.C NOT IN CONTRACT TRISTANIA CONFERTA BRISBANE BOX TREE 4-30-24 Page 1825 of 2548 SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME PLANTING SCHEDULE INSTALL SIZE SPACING WATER USE DETAIL REMARKS B MATURE SIZE QTY. DPER RCAAR SMAE AF SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME TREE SCHEDULE MATURE SIZE INSTALL SIZE WATER USE QTY. DETAIL REMARKS SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME HYDROSEED SCHEDULE LBS/ACRE WATER USE QTY. REMARKS 04/10/24 01/31/26 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 04/10/24 L-04 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 18 TRISTANIA CONFERTA BRISBANE BOX TREE 4-30-24 Page 1826 of 2548 LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK B B B A292" 85.6 EX. A282" 97.0 EX. A26 2" 75.9 EX. A27 2" 97.0 EX. A302" 82.7 EX. A31 2" 79.1 EX. A31 A36 2" 97.1 EX. A32 11/2" 11/4" 11/4" 11/4" 11/4" 11/4" 11/4" 11/4" 11/4" 11/4" 11/4" 1"11/4" 3/4" 1" 3/4" 3/4" 3/4" 1" 1" 3/4"3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 1" 11/4" 11/4" 11/4" 11/4" 1" 1" 1" 1"11/4" 11/2" 11/4" 2" 21/2" 21/2" 2" 2" 11/4" 21/2" 3" 3" 3" 11/2" 2" 11/4" 11/2" 11/2" 21/2" 21/2" 21/2" 1" 11/4" 11/4" 11/4" 11/4" 11/4" 11/4" 11/2" 11/4" 11/4" A32 1" 1.3 150' F 1"1" 1" 1" 1" 1" 1" 1" 3/4" 3/4" 11/4" 1" 1" 3/4" 3/4" 3/4" 3/4" 1" 1" 3/4" 3/4" 1" 11/4" 11/4" LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK NO PARKING NO PARKING LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK B B B F F 11/4" 11/4" 11/4" 11/4" A351" 18.9 2,140' A20 1.5" 45.4 EX. A212" 77.2 EX. C B B A222" 90.7 EX. A242" 85.5 EX. A232" 85.5 EX. A252" 87.0 EX. 3/4" 3/4" 11/2" 11/2" 11/2" 11/2" 11/2" 11/2" 11/4" F F 1" 1" 11/2" 3/4" 3/4" 1"3/4" 3/4"3/4" 11/4" 1" 1" 1" 3/4" 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 I-01 0 10' 20' 1" = 20' I C Y T O F H

E R M O S
A
B E A C H , C A 1 9 0 7 N NOTE A: EXISTING CONTROLLER "A" AND ALL OF THE EXISTING LOW VOLTAGE CONTROL WIRES SHALL BE PROTECTED IN PLACE AND REMAIN IN SERVICE. CONTROLLER "A" IS LOCATED APPROXIMATELY 200 FEET SOUTH FROM THE LOCATION SHOWN ON THE DRAWINGS. A 4 STATION THRIVE EVO WIRELESS VALVE SYSTEM SHALL BE INSTALLED TO SERVE THE NEW RCV "A35", INSTALL THE THRIVE TRANSMITTER INSIDE THE EXISTING CONTROLLER ENCLOSURE AND WIRE THE TRANSMITTER TO THE CONTROLLER'S 24 VOLT POWER, THE STATION 35 ON THE CONTROLLER, AND THE COMMON GROUND WIRE. THE THRIVE RECEIVER SHALL BE INSTALLED INSIDE THE VALVE BOX FOR NEW RCV "A35" AND CONNECT IT TO THE RCV AS REQUIRED BY THE MANUFACTURER. INSTALL NEW BATTERIES IN THE RECEIVER AND TEST AND ENSURE THAT THE COMMUNICATION BETWEEN THE TRANSMITTER AND RECEIVER IS STABLE. PROGRAM THE CONTROLLER AS REQUIRED TO SCHEDULE STATIONS "A31" AND "A32" (BOTH NEW TURF AREAS, AND STATION "A35" NEW DRIP IRRIGATION FOR SHRUB AND GROUND COVER AREAS. NOTE B: THESE PLANS ARE DIAGRAMMATIC AND BASED ON THE ORIGINAL IRRIGATION DRAWINGS FROM DECEMBER 9, 1997. ACTUAL VALVE, SPRINKLER HEAD, AND PIPE LOCATIONS MAY VARY FROM WHERE SHOWN ON THESE DRAWINGS. CONTRACTOR SHALL FIELD VERIFY THE PLAN LOCATIONS PRIOR TO BIDDING. ALL DIRECTIONS FOR VALVE AND SPRINKLER HEAD RELOCATION AND INSTALLATION SHALL FOLLOW THE INSTRUCTIONS AND DETAILS PROVIDED. ACTUAL LOCATIONS MAY VARY AND THE CONTRACTOR SHALL MAKE ADJUSTMENTS AS NECESSARY TO COMPLETE THE DESCRIBED WORK AT NO ADDITIONAL COST. NOTE C: CONTRACTOR SHALL DOCUMENT THE RELOCATED EQUIPMENT LOCATIONS IN AS-BUILT DRAWINGS AS DESCRIBED IN THE IRRIGATION SPECIFICATIONS. NOTE D: THE SPRINKLER HEAD CHANGES SHOWN ON THESE DRAWINGS ARE SHOWN TO PREVENT OVER SPRAY OF RECYCLED WATER ONTO ADJACENT D.G. PATH, BENCHES, EXERCISE EQUIPMENT AND PAVING. NEW ROTOR HEADS SHOWN SHALL BE INSTALLED AND ADJACENT HEADS ADJUSTED TO ELIMINATE ANY OVER SPRAY. NOZZLES SHOWN FOR ROTOR HEADS ARE APPROXIMATE AND SHOULD BE CHECKED WITH ADJACENT HEADS TO MATCH THE EXISTING MATCHED PRECIPITATION RATE NOZZLE SCHEDULE USED FOR THE EXISTING ROTOR HEADS. RETAIN ALL UNUSED NOZZLES FROM HUNTER NOZZLE TREE AND BE PREPARED TO CHANGE THE NOZZLES SHOULD DIRECTED BY CITY STAFF OR THE IRRIGATION CONSULTANT DURING THE COVERAGE TEST OR FINAL SITE OBSERVATION. I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN EACH EXISTING REMOTE CONTROL VALVE SHALL BE REPLACED WITH A NEW BRASS RCV (SEE LEGEND) AND REINSTALLED WITH NEW BOX AND COMPONENTS ONTO A 2" VALVE MANIFOLD. EACH VALVE MANIFOLD SHALL BE ISOLATED FROM THE EXISTING MAINLINE BY A 2" BRONZE BALL VALVE ASSEMBLY. THE NEW VALVE ASSEMBLY SHALL BE LOCATED IN THE LANDSCAPE AREA AND OUT OF THE NEW D.G. PATH. POINT OF CONNECTION FOR THE MANIFOLD ASSEMBLY SHALL BE ONE OF THE AVAILABLE 2" VALVE STUB-OUTS FROM THE EXISTING 4" MAINLINE. EXTEND THE EXISTING VALVE CONTROL WIRES TO THE NEW RCV LOCATIONS, LOCATE ALL WIRE SPLICES IN A PULL BOX (SEE LEGEND) AND ROUTE NEW PVC PIPE BETWEEN THE RCV'S AND THE EXISTING PVC LATERAL LINE CONNECTIONS. EACH EXISTING QUICK COUPLER VALVE SHALL REMAIN IN PLACE AND THE EXISTING VALVE BOX SHALL BE REPLACED WITH A NEW BOX. A PLASTIC BOX SHALL BE USED WHEN THE QCV IS LOCATED IN A LANDSCAPE AREA AND IN A TRAFFIC RATED CONCRETE BOX (SEE LEGEND) WHEN LOCATED IN THE NEW D.G. PATH. IRRIGATION CONTROLLER "A" WITH A THRIVE EVO 4 STATION WIRELESS TRANSMITTER; REFER TO NOTE "A" INSTALL NEW POP-UP SPRINKLER HEADS AND CONNECT TO THE EXISTING 3/4" LATERAL LINES AS SHOWN. NEW DRIP IRRIGATION CONTROL VALVE "A35". INSTALL NEW POP-UP SPRINKLER HEADS AND CONNECT TO THE EXISTING 1 1/2" LATERAL LINES AS SHOWN. INSTALL NEW POP-UP ROTOR HEADS AND CONNECT TO THE EXISTING 1 1/4" LATERAL LINES AS SHOWN. INSTALL NEW POP-UP ROTOR HEADS AND CONNECT TO THE EXISTING 1 1/4" LATERAL LINES AS SHOWN. INSTALL NEW POP-UP ROTOR HEADS AND CONNECT TO THE EXISTING 1 1/4" LATERAL LINES AS SHOWN. NEW SPRINKLER HEAD LAYOUT FOR "TURF" AREA COVERED BY RCV "A31" AS SHOWN. THIS IS INTENDED TO BE A COMPLETELY NEW SYSTEM TO REPLACE THE EXISTING ZONE. NEW SPRINKLER HEAD LAYOUT FOR "TURF" AREA COVERED BY RCV "A36" AS SHOWN. THIS IS INTENDED TO BE A COMPLETELY NEW SYSTEM TO REPLACE THE EXISTING ZONE. EXISTING TURF AREA COVERED BY RCV "A31". NEW TURF AREA COVERED BY RCV "A31". EXISTING TURF AREA COVERED BY RCV "A36". EACH EXISTING REMOTE CONTROL VALVE SHALL BE REPLACED WITH A NEW BRASS RCV (SEE LEGEND) AND REINSTALLED WITH NEW BOX AND COMPONENTS ONTO A 2" VALVE MANIFOLD. EACH VALVE MANIFOLD SHALL BE ISOLATED FROM THE EXISTING MAINLINE BY A 2" BRONZE BALL VALVE ASSEMBLY. THE NEW VALVE ASSEMBLY SHALL BE LOCATED IN THE LANDSCAPE AREA AND OUT OF THE NEW D.G. PATH. POINT OF CONNECTION FOR THE MANIFOLD ASSEMBLY SHALL BE ONE OF THE AVAILABLE 2" VALVE STUB-OUTS FROM THE EXISTING 4" MAINLINE. EXTEND THE EXISTING VALVE CONTROL WIRES TO THE NEW RCV LOCATIONS, LOCATE ALL WIRE SPLICES IN A PULL BOX (SEE LEGEND) AND ROUTE NEW pvc PIPE BETWEEN THE RCV'S AND THE EXISTING PVC LATERAL LINE CONNECTIONS. EACH EXISTING QUICK COUPLER VALVE SHALL REMAIN IN PLACE AND THE EXISTING VALVE BOX SHALL BE REPLACED WITH A NEW BOX. A PLASTIC BOX SHALL BE USED WHEN THE QCV IS LOCATED IN A LANDSCAPE AREA AND IN A TRAFFIC RATED CONCRETE BOX (SEE LEGEND) WHEN LOCATED IN THE NEW D.G. PATH. CAP EXISTING 1 1/4" PVC LATERAL LINE SERVING THE ROTOR SYSTEM ON THE WEST SIDE OF THE PATH FROM EXISTING RCV "A21". ASSUMED LOCATION OF THE EXISTING 4" PVC IRRIGATION MAINLINE. VERIFY THE EXISTING MAINLINE LOCATION AND DEPTH IN THE FIELD PRIOR TO STARTING WORK. PROTECT IN PLACE THE EXISTING MAINLINE. ASSUMED LOCATION OF THE EXISTING 4" PVC IRRIGATION MAINLINE. VERIFY THE EXISTING MAINLINE LOCATION AND DEPTH IN THE FIELD PRIOR TO STARTING WORK. PROTECT IN PLACE THE EXISTING MAINLINE. EXISTING IRRIGATION WATER POINT OF CONNECTION (METER, PRESSURE REGULATOR, AND BACK FLOW PREVENTION ASSEMBLY) SHALL BE PROTECTED IN PLACE AND REMAIN IN SERVICE. FOR IRRIGATION PLAN SEE SHEET I-01. FOR IRRIGATION LEGEND SEE SHEET I-02. FOR IRRIGATION DETAILS SEE SHEETS I-03 AND I-04. INSTALL A TSM DOUBLER SOLENOID SHARING DEVICE TO ALLOW EXISTING STATION CONTROL WIRES "A31" AND "A32" TO SHARE THE EXISTING WIRE FOR "A31" BACK TO THE CONTROLLER. USE STATIONS "31" AND "36" AT THE CONTROLLER, SEE LEGEND FOR ADDITIONAL INFORMATION. NEW DRIP IRRIGATION FOR SHRUB PLANTINGS COVERED BY RCV "A32". NEW DRIP IRRIGATION CONTROL VALVE "A35" SHALL BE CONNECTED TO THE CONTROLLER VIA A WIRELESS EVO THRIVE DEVICE AS DESCRIBED IN THE CONTROLLER NOTES AND ON THE LEGEND. VERIFY OPEN A MINIMUM OF TWO (2) OPEN STATIONS ON THE EXISTING CONTROLLER. EXISTING STATION CONTROL WIRE FOR STATION "A32" SHALL BE USED FOR THE NEW DRIP VALVE TO BE INSTALLED, SEE LEGEND. NEW SPRINKLER HEAD LAYOUT FOR TURF AREA COVERED BY EXISTING RCV "A20" AS SHOWN. THIS IS INTENDED TO BE A COMPLETELY NEW SYSTEM TO REPLACE THE EXISTING SPRINKLERS IN THIS AREA AND ALSO TO BE CONNECTED TO EXISTING SPRINKLERS AND LATERAL LINES SHOWN ON THE OPPOSITE SIDE OF THE PATHWAY, SEE ABOVE. NEW DRIP TUBING IRRIGATION FOR THE NEW SHRUB PLANTING AS SHOWN. EXISTING TURF SPRAY HEAD IRRIGATION IN THIS AREA SHALL REMAIN IN PLACE AND OPERATIONAL WITH MODIFICATIONS TO BE MADE BY THE CONTRACTOR TO ADJUST THE HEAD LAYOUT FOR THE AREA AFFECTED BY THE PATH REALIGNMENT. CONTRACTOR TO PROVIDE NEW HEADS, SWING JOINTS, AND LATERAL LINES AS REQUIRED TO MODIFY THE EXISTING SYSTEM TO THE SATISFACTION OF THE CITY. CONNECT NEW 1 1/2" PVC LATERAL LINE TO THE EXISTING LATERAL LINE SYSTEM AND EXISTING RCV "A20" AS NECESSARY. IF ANY EXISTING SPRINKLER HEADS ARE FOUND TO BE LOCATED WITHIN THE NEW D.G. PATH THEY SHALL BE A) RELOCATED IF THE HEADS ARE STILL ACTIVE AND OPERATED BY THE EXISTING IRRIGATION SYSTEM, OR B) REMOVED IF THEY ARE FOUND TO BE INACTIVE AND NON-FUNCTIONAL. EXISTING TURF SPRAY HEAD IRRIGATION IN THIS AREA SHALL REMAIN IN PLACE AND OPERATIONAL WITH MODIFICATIONS TO BE MADE BY THE CONTRACTOR TO ADJUST THE HEAD LAYOUT FOR THE AREA AFFECTED BY THE PATH REALIGNMENT. CONTRACTOR TO PROVIDE NEW HEADS, SWING JOINTS, AND LATERAL LINES AS REQUIRED TO MODIFY THE EXISTING SYSTEM TO THE SATISFACTION OF THE CITY. NEW TREE SHALL BE IRRIGATED WITH THE EXISTING SPRINKLER SYSTEM, NO NEW IRRIGATION SYSTEM TO BE PROVIDED. CONTRACTOR SHALL MANUALLY IRRIGATE THE NEW TREES AS NEEDED THROUGH THE MAINTENANCE PERIOD. NEW TREE SHALL BE IRRIGATED WITH THE EXISTING SPRINKLER SYSTEM, NO NEW IRRIGATION SYSTEM TO BE PROVIDED. CONTRACTOR SHALL MANUALLY IRRIGATE THE NEW TREES AS NEEDED THROUGH THE MAINTENANCE PERIOD. NEW SHRUBS SHALL BE IRRIGATED WITH THE EXISTING SPRINKLER SYSTEM, ADJUST HEADS AS REQUIRED TO FULLY COVER THE NEW SHRUB PLANTINGS. IF ANY EXISTING SPRINKLER HEADS ARE FOUND TO BE LOCATED WITHIN THE NEW D.G. PATH THEY SHALL BE A) RELOCATED IF THE HEADS ARE STILL ACTIVE AND OPERATED BY THE EXISTING IRRIGATION SYSTEM, OR B) REMOVED IF THEY ARE FOUND TO BE INACTIVE AND NON-FUNCTIONAL. ASSUMED LOCATION OF THE EXISTING 12" WEST BASIN MUNICIPAL WATER DISTRICT RECLAIMED WATER LINE. VERIFY IN FIELD LOCATION AND DEPTH IN THE FIELD PRIOR TO STARTING WORK. PROTECT IN PLACE. ASSUMED LOCATION OF THE EXISTING 12" WEST BASIN MUNICIPAL WATER DISTRICT RECLAIMED WATER LINE. VERIFY IN FIELD LOCATION AND DEPTH IN THE FIELD PRIOR TO STARTING WORK. PROTECT IN PLACE. 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 19 N.I.C NOT IN CONTRACT 4-30-24 Page 1827 of 2548 MODEL NO. / DESCRIPTION IRRIGATION MATERIAL LEGEND Q T H F SYMBOL MANUFACTURER FLOW RATE (GPM) PSI RADIUS DETAIL PURPLE PVC PIPE 3/4" - 3" SCH. 40, SOLVENT WELD WITH SCH. 40 PVC FITTINGS, AS RECYCLED WATER LATERAL LINES, INSTALL 12" BELOW FINISHED GRADE PAVING,DG PATH, HARDSCAPE, ETC. (OR AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE) INSIDE SLEEVES. SLEEVES UNDER PEDESTRIAN PURPLE PVC PIPE SCH. 40 AS SLEEVING, TWICE THE DIAMETER OF PIPE OR WIRE BUNDLE CARRIED (2" MINIMUM SIZE) INSTALL ALL PIPE AND WIRE UNDER DBR/Y-6 DIRECT BURIAL, U.L. APPROVED, WATER-PROOF WIRE CONNECTORS FOR USE ON ALL WIRE SPLICES AND CONNECTIONS AS APPROVED AS APPROVED 3MEXISTING GATE VALVE TO REMAIN IN PLACE WITH A NEW VALVE BOX TO BE INSTALLED OVER THE EXISTING VALVE. WHEN THE GATE VALVE IS LOCATED IN THE C LASCO PURPLE PVC PIPE 2" CL. 315, SOLVENT WELD WITH SCH. 80 PVC FITTINGS, AS RECYCLED WATER MANIFOLD MAINLINES, INSTALL 18" BELOW FINISHED GRADE EXISTING AS APPROVED ALL FITTINGS USED WITH SOLVENT WELD MAINLINE PIPE SHALL BE SCH. 80 PVC FITTINGS, GRAY IN COLOR, AND SIZED TO MATCH THE MAINLINE PIPE. ALL FITTINGS USED WITH SOLVENT WELD LATERAL LINE PIPE SHALL BE SCH. 40 PVC, WHITE IN COLOR, AND SIZED TO MATCH THE LATERAL LINE PIPE. ALL THREADED PVC NIPPLES SHALL BE SCH. 80 PVC PIPE, DARK GRAY IN COLOR, WITH MOLDED THREADS. PR. RATE WELD-ON ALL SOLVENT WELD CONNECTIONS FOR BOTH MAINLINE AND LATERAL LINE SHALL BE MADE USING THE TWO-STEP PROCESS OF PRIMER AND SOLVENT CEMENT. PRIMER SHALL BE P-68 LOW VOC "PURPLE PRIMER". SOLVENT CEMENT SHALL BE 705 LOW VOC, GRAY COLORED "MEDIUM BODIED" CEMENT. USE DAUBERS SIZED AT LEAST ONE-HALF THE SIZE OF THE LARGEST PIPE BEING JOINED. ALL SOLVENT CEMENTED JOINTS SHALL BE MADE PER THE PIPE AND FITTING MANUFACTURER'S RECOMMENDATIONS. F GPH IRRIGATION/ GDFN-R DRIP FLUSH / INDICATOR NOZZLE, PURPLE IN COLOR, INSTALLED ONTO A RAIN BIRD RD-12-S-P30-F-NP POP-UP SPRINKLER BODY. THE FLUSH NOZZLE SHALL BE CLOSED FOR NORMAL OPERATION OF THE DRIP SYSTEM. AS APPROVED PVC SUPPLY AND DISCHARGE HEADERS SHALL BE PVC LATERAL LINE PIPE (AS SHOWN BELOW), 1 1/4" MINIMUM SIZE WITH SCH. 40 PVC FITTINGS. NO SYMBOL NO SYMBOL ALL EXISTING REMOTE CONTROL VALVES SHALL BE REPLACED WITH NEW BRASS 950DW BRASS REMOTE CONTROL VALVES (RCV). RCV SIZE AS SHOWN REGULATING BASKET FILTER. INSTALL A RAIN BIRD PRB-100-QKCHK, 200 MESH BASKET FILTER DOWN STREAM OF THE CONTROL VALVE. INSTALL THE (1", 1 1/2" AND 2" SIZES). INSTALL EACH NEW RCV WITH A "PRS-MOD" PRESSURE REGULATOR AND A PURPLE COLOR CODED CROSS HANDLE. REMOTE BALL VALVE UPSTREAM OF THE VALVES. RELOCATED VALVES MAY BE INSTALLED WITH UP TO FOUR (4) RCV'S PER MANIFOLD. ALL VALVE MANIFOLDS 950DW 1" BRASS DRIP REMOTE CONTROL VALVE ASSEMBLY (DRCV). ASSEMBLY IS COMPLETE WITH CONTROL VALVE AND A PLASTIC, PRESSURE EXISTING PAVING SHALL BE INSTALLED 24" BELOW FINISHED GRADE.. NO SYMBOL NO SYMBOL NO SYMBOL PLASTIC VALVE BOXES SHALL BE VB SERIES, WITH OVERLAPPING LIDS. VALVE BOX BODIES SHALL BE BLACK IN COLOR. LIDS FOR BOXES SHALL BEPURPLE. ALL BOXES SHALL BE SECURED WITH A RAIN BIRD VB-LOCK-H HEXAGON HEAD BOLT, WASHER AND CLIP. BOXES SHALL BE AS SHOWN BELOW: DESCRIPTION 10" ROUND BOXES STANDARD RECTANGULAR BOXES VB-10RNDB (BOX) AND VB-10RNDPL (LID) VB-STDB (BOX) AND VB-STDPL (LID) BLACK BOXES AND PURPLE LIDS NO SYMBOL RAIN BIRD C,D C,D C,D C,D,O C,E FGH,K I,KL,MOON/A PN/A N/A QR .45, .59, .89, 1.78 .93, 1.23, 1.85, 3.70 .59, .79, 1.18, 2.37 303030 15 FT 12 FT RD-06-S-P30-F-NP 6" POP-UP TURF HEAD WITH AN 10 SERIES HE-VAN ADJUSTABLE ARC NOZZLE 10 FT RD-06-S-P30-F-NP 6" POP-UP TURF HEAD WITH AN 12 SERIES HE-VAN ADJUSTABLE ARC NOZZLE RD-06-S-P30-F-NP 6" POP-UP TURF HEAD WITH AN 15 SERIES HE-VAN NOZZLE RAIN BIRD RD-06-S-P30-F-NP 6" POP-UP TURF HEAD WITH AN 8 SERIES HE-VAN ADJUSTABLE ARC NOZZLE .29, .39, .59, 1.17 30 8 FT 2.03 IN./HR. RAIN BIRD RAIN BIRD RAIN BIRD 1.98 IN./HR. 1.83 IN./HR. 1.83 IN./HR. RAIN BIRD TL SERIES 17mm BARBED FITTINGS FOR CONNECTIONS BETWEEN DRIP TUBING (TUBING-TO-TUBING ONLY). NO HEATING OF TUBING SHALL BE ALLOWED. TLHCVXR5-RW5-12 SUBSURFACE DRIP TUBING (BLACK EXTERIOR COLOR WITH A PURPLE STRIPE) WITH 0.53 GPH, PRESSURE COMPENSATING EMITTERS EQUIPPED WITH A CHECK VALVE AND ANTI-SIPHON FEATURE. DRIP TUBING SHALL BE INSTALLED 2" BELOW THE FINISHED SOIL GRADE (NOT COUNTING MAXIMUM OF 4" FROM THE EDGE OF ANY HARDSCAPE OR TURF EDGE. ALL SUBSEQUENT INTERIOR ROWS SHALL BE ADJUSTED TO PROVIDE AN EVEN SPACING ACROSS THE PLANTER WITHOUT EXCEEDING 16" MAXIMUM SPACING. INSTALL 9" PVC COATED GALVANIZED TUBING STAKES A MAXIMUM OF FIVE (5) FEET ON CENTER ALONG THE LENGTH OF THE TUBING. TUBING STAKES SHALL BE MODEL #GDTS140900 AS MANUFACTURED BY GPH IRRIGATION SPACING REQUIREMENTS ABOVE AND IN DETAILS. AND A PHYSICAL BARRIER TO PREVENT ROOT INTRUSION INTO THE DRIP EMITTER. DRIP EMITTERS SHALL BE CONTINUOUS FLUSHING TYPE AND PRODUCTS (866) 582-9684. THE LINES SHOWN ON THE PLANS REPRESENT THE APPROXIMATE DIRECTION AND SPACING OF THE DRIP TUBING ROWS, SEE ADDITIONAL MULCH COVER) AND IN PARALLEL ROWS A MAXIMUM OF 16" ON CENTER. THE PERIMETER ROW OF DRIP TUBING SHALL BE INSTALLED A CONNECTION BETWEEN DRIP TUBING AND PVC SUPPLY AND DISCHARGE HEADERS SHALL BE MADE USING SCH. 40 PVC SXT FITTINGS, TL BARBED DRIP TUBING FITTINGS AND BLANK DRIP TUBING. USE A SCH. 40 PVCVLATERAL X LATERAL X 1/2" SxSxT TEE (OR A LATERAL X 1/2" SxT 90° ELBOW) FITTING ON THE PVC LATERAL LINE HEADER, A TL050MA BARB X 1/2" MALEVADAPTER, A SHORT LENGTH OF BLANK DRIP TUBING, AND A TLTEE BARBED TEE FITTING. ALL END RUNS OF TUBING SHALL BE CONNECTED WITH A PVC DISCHARGE HEADER. NO HEATING OF TUBING SHALL BE ALLOWED FOR ASSEMBLY. NETAFIM NETAFIM NETAFIM THRIVE EVO AAAA SUPERIOR SUPERIOR NO SYMBOL RAIN BIRD SPRINKLER HEADS WITH 1/2" NPT INLETS SHALL BE INSTALLED WITH A SA-125050 POLY SWING JOINT AS PART OF THE ASSEMBLY A NO SYMBOL HUNTER SPRINKLER HEADS WITH 3/4" NPT INLETS SHALL BE INSTALLED WITH A HSJ-0-3-2-2-12 PVC SWING JOINT AS PART OF THE ASSEMBLY B SUB-SURFACE DRIP TUBING AS DESCRIBED BELOW: 0.53 GPH / EMITTER 30 N/A 0.70 IN./HR. INTERNALLY INSTALLED IN THE DRIP TUBING AT 12" O.C. SPACING. DRIP TUBING SHALL BE EQUIPPED WITH CUPRON (COPPER OXIDE) INFUSED EMITTERS FOUR STATION WIRELESS VALVE CONTROL SYSTEM TO BE INSTALLED TO OPERATE THE ADDED DRIP REMOTE CONTROL VALVE(S). INSTALL THE THRIVE TRANSMITTER INSIDE THE EXISTING CONTROLLER ENCLOSURE AND WIRE TO STATION 35 ON THE EXISTING CONTROLLER. INSTALL THE THRIVE RECEIVER TO THE UNDERSIDE OF THE DRIP REMOTE CONTROL VALVE VALVE BOX AND WIRE TO THE DC LATCHING SOLENOID ON THE CONTROL VALVE. INSTALL THE REQUIRED BATTERIES INTO THE THRIVE RECEIVER PER THE MANUFACTURER'S REQUIREMENTS. NO SYMBOL RAIN BIRD USE THE 6" POP-UP HEAD SHOWN ABOVE FOR ALL NEW TURF AREAS AND USE A RD-12-S-P30-F-NP 12" POP-UP FOR REPLACEMENT OF ANY EXISTING 12" POP-UP SPRAY HEADS. A HUNTER PGP-12-CV-R 12" POP-UP SHRUB ROTOR WITH #3 (Q) AND #5 (T) STANDARD NOZZLES 45 40 FT 0.63 IN./HR. B PLANTED AREA AND OUTSIDE OF THE NEW D.G. PATH, THE NEW VALVE BOX SHALL BE A RECTANGULAR PLASTIC BOX. WHERE THE GATE VALVE IS LOCATED WITHIN THE NEW D.G. PATH, THE NEW VALVE BOX SHALL BE A TRAFFIC RATED, CONCRETE VALVE BOX WITH A LOCKING, HINGED METAL LID. QUICK COUPLER VALVE TO REMAIN IN PLACE WITH A NEW VALVE BOX TO BE INSTALLED OVER THE EXISTING VALVE. WHEN THE QUICK COUPLER VALVE IS LOCATED IN THE PLANTED AREA AND OUTSIDE OF THE NEW D.G. PATH, THE NEW VALVE BOX SHALL BE A 10" ROUND PLASTIC BOX. WHERE THE QUICK COUPLER VALVE IS LOCATED WITHIN THE NEW D.G. PATH, THE NEW VALVE BOX SHALL BE A TRAFFIC RATED, CONCRETE VALVE BOX WITH A LOCKING, HINGED METAL LID. SHALL BE INSTALLED OUTSIDE OF THE NEW DG PATH AND WITHIN THE LANDSCAPE AREA. INSTALL THE NEW RCV INSIDE A STANDARD RECTANGULAR PLASTIC VALVE BOX WITH A PURPLE LID. FOR EXISTING RCV'S REMOVED FROM THE EXISTING MAINLINE, USE A 2" STUB-UP AS THE MANIFOLD CONNECTION POINT AND EXTEND THE MANIFOLD MAINLINE TO THE NEW BALL VALVE AND VALVE MANIFOLD LOCATION. ALL UNUSED EXISTING VALVE STUB-UPS SHALL BE CAPPED AND SEALED. EXTEND CONTROL WIRES FOR THE RCV'S AS REQUIRED TO ENSURE CONNECTION OF THE RCV'S TO THEIR ORIGINAL CONTROLLER STATION NUMBERS. NO RCV'S SHALL BE INSTALLED IN THE NEW DG PATH. CONTROL VALVES SHALL BE REMOVED FROM THE MAINLINE AND INSTALLED ONTO A SEPARATE 2" SCH 40 PVC MANIFOLD WITH A BRASS ISOLATION DRCV INSIDE A STANDARD SIZED RECTANGULAR VALVE BOX. REPLACE THE STANDARD VALVE SOLENOID WITH A SUPERIOR MODEL 16305 DC LATCHING SOLENOID AND WIRE TO THE THRIVE EVO TRANSMITTER TO BE LOCATED IN THE VALVE BOX, ATTACHED TO THE UNDERSIDE OF THE BOX LID. T-585-66-LF 2" BRASS, FULL PORT BALL VALVE WITH FIPT END CONNECTIONS, AS A MANIFOLD ISOLATION VALVE TO BE INSTALLED ONTO THE NEW REMOTE CONTROL VALVE MANIFOLDS. ALL RELOCATED, EXISTING VALVE GROUPS ARE INTENDED TO BE INSTALLED IN MANIFOLDS OFF OF THE THE EXISTING MAINLINE, SEE DETAILS. INSTALL THE ISOLATION BALL VALVE INSIDE A STANDARD SIZE, PLASTIC VALVE BOX. B NIBCO J,K NO SYMBOL EXISTING 2" THROUGH 4" PVC IRRIGATION MAINLINE TO BE PROTECTED IN PLACE AND TO REMAIN IN SERVICE FOR THE IRRIGATION SYSTEM W363HFL TRAFFIC RATED CONCRETE VALVE BOXES WITH A LOCKING, HINGED CAST IRON COVER. LIDS FOR BOXES SHALL BE PAINTED PURPLE TO INDICATE THE USE OF RECYCLED / RECLAIMED WATER. BOXES SIZED AT 10.50" X 17.25" RECTANGULAR. USE FOR ALL ISOLATION VALVES, QUICK NO SYMBOL EISEL ENT. R COUPLER VALVES, PULL BOXES, AND REMOTE CONTROL VALVES LOCATED WITHIN THE NEW D.G. PATH. EISEL ENTERPRISES IS LOCATED IN PLACENTIA, CALIFORNIA, TELEPHONE NUMBER (714) 993-1706. PAIGE ELECTRIC P7079D POLYETHYLENE INSULATED, SOLID COPPER CONDUCTOR IRRIGATION CONTROL WIRE #14UF AWG DIRECT BURIAL (U.L. APPROVED). PILOT WIRES SHALL BE RED IN COLOR, COMMON GROUND WIRE SHALL BE WHITE IN COLOR, SPARE WIRES SHALL BE YELLOW IN COLOR. USE NEW WIRE TO EXTEND THE EXISTING CONTROL WIRES AS NECESSARY WHEN RELOCATING THE REMOTE CONTROL VALVES. MAKE CONNECTIONS TO EXISTING WIRES USING WATERPROOF WIRE CONNECTIONS AND INSTALL INSIDE A VALVE BOX WITH AT LEAST THREE FEET OF WIRE LOOP TO BE ABLE TO REMOVE SPLICES FROM THE BOX. USE PLASTIC 10" ROUND BOX IN PLANTED AREAS AND RECTANGULAR CONCRETE WITH METAL LID IF INSTALLED IN NEW D.G. PATH. NO SYMBOL O,P,Q APPROXIMATE LINEAR FOOTAGE FLOW RATE IN G.P.M. VALVE SIZE IN INCHES A21 1" 20TB A34 1" 15.9 1,800' OF DRIP TUBING (IN DRIP ZONES) CONTROLLER LETTER AND STATION NUMBER VALVE CALLOUT LEGEND 3.0, 5.0 IF FOUND (ASSUMED LOCATIONS) (ASSUMED LOCATIONS) (NEW EQUIPMENT) (NEW EQUIPMENT) (NEW EQUIPMENT) HUNTER PGP-12-CV 12" POP-UP SHRUB ROTOR WITH MPR-25 NOZZLES (RED) 1.00, 1.98 45 25 FT 0.70 IN./HR. A NO SYMBOL TRANSITIONAL A TSM DOUBLER SHALL BE USED TO LINK STATIONS "A31" AND "A36" TO THE SAME PILOT WIRE ("A31" FROM THE CONTROLLER. INSTALL THE DOUBLER AS N RECOMMENDED BY THE MANUFACTURER USING THE TWO STATIONS AT THE CONTROLLER ("31" AND "36") PER INSTALLATION OPTION #1, USING A JUMPER WIRE BETWEEN TERMINALS "31 AND "36". THE EXISTING VALVE STATION WIRE FOR VALVE "A32" TO SERVE THE NEW STATION "A32" (DRIP SYSTEM) AS SYSTEMS MFG. "TSM" NO SYMBOL WEATHERMATIC IT IS ASSUMED THAT THERE ARE TWO OPEN STATIONS ON THE EXISTING 36 STATION SMARTLINE / SMART LINK IRRIGATION CONTROLLER, #35 AND #36. IF N/A IT IS FOUND THAT THERE ARE NOT TWO (2) OPEN STATIONS ON THE CONTROLLER, A WEATHERMATIC SLM12-4800 EXPANSION MODULE SHALL BE ADDED TO THE EXISTING CONTROLLER. PROVIDE A BID FOR THE ADDITIONAL EXPANSION MODULE AS A SEPARATE LINE ITEM AS IT MAY NOT BE NEEDED. SHOWN ON THE PLANS. 811 W 7th Street, 8th Floor Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 I-02 1. ALL LOCAL MUNICIPAL AND STATE LAWS, RULES AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF THIS WORK ARE HEREBY INCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS AND THEIR PROVISIONS SHALL BE CARRIED OUT BY THE CONTRACTOR. 2. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES, STRUCTURES AND SERVICES BEFORE COMMENCING WORK. THE LOCATIONS OF UTILITIES, STRUCTURES AND SERVICES SHOWN IN THESE PLANS ARE APPROXIMATE ONLY. ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE CITY. 3. THE CONTRACTOR SHALL OBTAIN THE PERTINENT ENGINEERING OR ARCHITECTURAL PLANS BEFORE BEGINNING WORK. 4. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED TO PERFORM THE WORK INDICATED HEREIN BEFORE BEGINNING WORK. 5. THIS DESIGN IS DIAGRAMMATIC. ALL EQUIPMENT SHOWN IN PAVED AREAS IS FOR DESIGN CLARITY ONLY AND IS TO BE INSTALLED WITHIN PLANTING AREAS. 6. THE CONTRACTOR SHALL NOT WILLFULLY INSTALL ANY EQUIPMENT AS SHOWN ON THE PLANS WHEN IT IS OBVIOUS IN THE FIELD THAT UNKNOWN CONDITIONS EXIST THAT WERE NOT EVIDENT AT THE TIME THESE PLANS WERE PREPARED. ANY SUCH CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE CITY PRIOR TO ANY WORK OR THE IRRIGATION CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR ANY FIELD CHANGES DEEMED NECESSARY BY THE CITY. 7. INSTALL ALL EQUIPMENT AS SHOWN IN THE DETAILS AND SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH LOCAL CITY, COUNTY AND STATE REQUIREMENTS FOR BOTH EQUIPMENT AND INSTALLATION. 8. ACTUAL LOCATION FOR THE INSTALLATION OF THE CONTROLLER IS TO BE DETERMINED IN THE FIELD BY THE CITY. 9. ALL PIPE UNDER PAVED OR DECOMPOSED GRANITE AREAS TO BE INSTALLED IN SLEEVING TWICE THE DIAMETER OF THE PIPE CARRIED. SEE LEGEND FOR TYPE. ALL WIRE UNDER PAVED AREAS TO BE INSTALLED IN A SCH. 40 SLEEVE THE SIZE REQUIRED TO EASILY PULL WIRE THROUGH. ALL SLEEVES TO BE INSTALLED WITH A MINIMUM DEPTH AS SHOWN ON THE SLEEVING DETAILS. SLEEVES TO EXTEND AT LEAST 12" PAST THE EDGE OF THE PAVING. 10. ALL QUICK COUPLER AND REMOTE CONTROL VALVES TO BE INSTALLED IN SHRUB OR GROUND COVER AREAS WHERE POSSIBLE. ALL QUICK COUPLER AND REMOTE CONTROL VALVES TO BE INSTALLED AS SHOWN ON THE INSTALLATION DETAILS. INSTALL ALL QUICK COUPLER AND REMOTE CONTROL VALVES WITHIN 18" OF HARDSCAPE. 11. ALL HEADS ARE TO BE INSTALLED WITH THE NOZZLE, SCREEN AND ARCS SHOWN ON THE PLANS. ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVERSPRAY ONTO BUILDINGS, WALLS, FENCES AND HARDSCAPE. THIS INCLUDES, BUT NOT LIMITED TO, ADJUSTMENT OF DIFFUSER PIN OR ADJUSTMENT SCREW, REPLACEMENT OF PRESSURE COMPENSATING SCREENS, REPLACEMENT OF NOZZLES WITH MORE APPROPRIATE RADIUS UNITS AND THE REPLACEMENT OF NOZZLES WITH ADJUSTABLE ARC UNITS. 12. THE CONTRACTOR IS REQUIRED TO CONTACT DIGALERT OR 811 A MINIMUM OF TWO (2) DAYS PRIOR TO THE START OF ANY EXCAVATIONS ON THE PROJECT AND SPECIFICALLY PRIOR TO THE INSTALLATION OF ANY GROUNDING RODS. DIAL 811 OR LOG ONTO WWW.DIGALERT.ORG TO START A PROJECT TICKET. DIGALERT AND 811 IS A FREE SERVICE PROVIDED TO THE PROJECT. FAILURE TO CONTACT AND HAVE THE EXISTING UTILITIES IDENTIFIED, LOCATED AND MARKED SHALL MAKE THE CONTRACTOR SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES. IRRIGATION NOTES FOR IRRIGATION PLAN SEE SHEET I-01. FOR IRRIGATION LEGEND SEE SHEET I-02. FOR IRRIGATION DETAILS SEE SHEETS I-03 AND I-04. I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 20 4-30-24 Page 1828 of 2548 811 W 7th Street, 8th Floor
Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 I-03 I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN SECTION VIEW - N.T.S. 12" POP-UP HEAD SWING JOINT CONFIGURATION TWELVE (12) INCH POP-UP SPRINKLER HEAD SIX (6) INCH POP-UP SPRINKLER HEAD 12" LEGEND AND PIPE INSTALLATION DETAIL FINISHED GRADE AT DEPTH SHOWN ON PVC LATERAL LINE PIPE, TYPE AND SIZE AS SHOWN ON DRAWINGS, INSTALL BELOW 1/2" SIZE WITH FIPT THREADS SCH 40 PVC SxSxT TEE FITTING, LATERAL X LATERAL X MODEL SA-125050. 6" POP-UP HEAD CONFIGURATION SHOWN. PRE-ASSEMBLED POLY, TRIPLE SWING JOINT, 1/2" MIPT INLET AND OUTLET WITH A 12" LAY LENGTH, USE RAIN BIRD INSTALL SPRAY HEADS 4" FROM PAVING EDGE IN TURF AREAS. AREA WITHOUT OVERSPRAY ONTO PAVING, FENCES, WALLS OR BUILDINGS. INSTALL SPRAY HEADS PLUMB. ADJUST NOZZLE STREAM TO COVER THE LANDSCAPE INSTALL SPRAY HEADS 6" FROM PAVING EDGE IN SHRUB AND GROUND COVER AREAS. INSTALL SPRAY HEADS 12" FROM THE FACE OF BUILDING WALLS OR WINDOWS. NOTE: INLET HAS 1/2" NPT THREADS. FINISHED GRADE IN TURF AREAS INSTALL POP-UP SPRAY HEAD FLUSH WITH GRADE IN SHRUB AND GROUND COVER AREAS INSTALL POP-UP SPRAY HEAD 1/2" ABOVE FINISHED UNDISTURBED SOIL MODEL, FEATURES, AND NOZZLES REQUIRED. SPRINKLER POP-UP SPRAY HEAD, 6" - 12" HEIGHT, SEE LEGEND FOR BRAND, 1/2" 12" POP-UP HEAD SWING JOINT CONFIGURATION TWELVE (12) INCH POP-UP ROTOR SPRINKLER HEAD SIX (6) INCH POP-UP ROTOR SPRINKLER HEAD 12" LEGEND AND PIPE INSTALLATION DETAIL FINISHED GRADE AT DEPTH SHOWN ON PVC LATERAL LINE PIPE, TYPE AND SIZE AS SHOWN ON DRAWINGS, INSTALL BELOW 3/4" SIZE WITH FIPT THREADS SCH 40 PVC SxSxT TEE FITTING, LATERAL X LATERAL X INSTALL ROTOR HEADS 4" FROM PAVING EDGE IN TURF AREAS. AREA WITHOUT OVERSPRAY ONTO PAVING, FENCES, WALLS OR BUILDINGS. INSTALL ROTOR HEADS PLUMB. ADJUST NOZZLE STREAM TO COVER THE LANDSCAPE INSTALL ROTOR HEADS 6" FROM PAVING EDGE IN SHRUB AND GROUND COVER AREAS. INSTALL ROTOR HEADS 12" FROM THE FACE OF BUILDING WALLS OR WINDOWS. INLET HAS 3/4" NPT THREADS. FINISHED GRADE IN TURF AREAS INSTALL POP-UP ROTOR HEAD FLUSH WITH GRADE IN SHRUB AND GROUND COVER AREAS INSTALL POP-UP ROTOR HEAD 1/2" ABOVE FINISHED UNDISTURBED SOIL MODEL, FEATURES, AND NOZZLES REQUIRED. SPRINKLER POP-UP ROTOR HEAD, 6" - 12" HEIGHT, SEE LEGEND FOR BRAND, 1/2" MODEL HSJ-0-3-3-3-12. 6" POP-UP HEAD CONFIGURATION SHOWN. PRE-ASSEMBLED POLY, TRIPLE SWING JOINT, 3/4" MIPT INLET AND OUTLET WITH A 12" LAY LENGTH, USE HUNTER NOTE: A POP-UP SPRAY HEAD B POP-UP ROTOR HEAD C DRIP TUBING LAYOUT INSTALLED FIVE (5) FEET ON CENTER HEADER, PVC LATERAL LINE PIPE, 1 1/4" MINIMUM SIZE, OTHERWISE SHRUBS OR GROUND COVERS, INLINE DRIP TUBING WITH INTERNAL DRIP EMITTERS, SEE LEGEND FOR BRAND, MODEL AND PERFORMANCE 17mm BARBED TEE FITTING MULCH LAYER, SEE PLANTING PLANS FINISHED GRADE SEE PLANTING PLANS SIZE PER THE DRAWINGS 1/2" MIPT X 17mm BARBED MALE ADAPTER FITTING AMENDED SITE SOIL 12" MINIMUM TEE FITTING, OR SLIP X 1/2" FIPT 90° FINISHED SOIL GRADE SCH. 40 PVC SLIP X SLIP X 1/2" FIPT DRIP TUBING SUPPLY OR DISCHARGE 2" IN SHRUB BEDS GPH IRRIGATION PRODUCTS 9" PVC COATED WIRE STAKE, #GDTS140900, LENGTH AS REQUIRED BLANK 17mm DRIP TUBING, ADAPTER FITTING, AND A BARBED TEE FITTING. NOTE: DRIP TUBING CONNECTION REQUIRED FOR ALL CONNECTIONS BETWEEN DRIP TUBING AND PVC HEADERS. ALL CNNECTIONS TO PVC LATERAL LINE INCLUDE THE PVC TEE OR 90° ELBOW FITTING, A BARB X 1/2" MIPT MALE D DRIP TUBING CONNECTION NOTE: INSTALL INDICATOR HEAD 10" FROM THE EDGE OF PAVING OR THE PLANTER EDGE. FOR RECYCLED WATER USE A GPH IRRIGATION GDFN-R, PURPLE COLOR CODED FLUSH NOZZLE. INSTALL POP-UP INDICATOR HEAD 1/2" ABOVE FINISHED GRADE IN INSTALL POP-UP INDICATOR HEAD 10" OFF OF PAVEMENT OR THE EDGE OF PLANTED AREA SERVED BY DRIP TUBING 6" 1/2" SHRUB AND GROUND COVER AREAS 12" POP-UP INDICATOR NOZZLE, SEE LEGEND, SOIL DISCHARGE HEADER SHALL BE INSTALLED 12" BELOW FINISHED SOIL GRADE, TYPICAL DRIP TUBING TO PVC HEADER CONNECTION, SEE CONNECTION DETAIL SCH 40 PVC SST TEE FITTING, 1 1/4" X 1 1/4" X 1/2" LINE PIPE, TYPE AND SIZE DRIP SYSTEM DISCHARGE AS SHOWN ON LEGEND, OR 1 1/4" MINIMUM SIZE HEADER, PVC LATERAL HEAD INLET HAS 1/2" NPT THREADS AND NOZZLE REQUIRED. INDICATOR SEE LEGEND FOR BRAND, MODEL, POP-UP INDICATOR HEAD, 12" HEIGHT, 4" 10" DRIP TUBING ROW, 4" FROM HARDSCAPE AMENDED DRIP TUBING ROW, SEE PLANS 6" JOINT, 1/2" MIPT INLET AND RAIN BIRD MODEL SA-125050 PRE-ASSEMBLED POLY SWING OUTLET AND A 12" LAY LENGTH. E DRIP INDICATOR HEAD FUSE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX. BRICK SUPPORTS, FOUR (4) REQUIRED PER BOX EXISTING GATE VALVE, 3/4" CRUSHED GRAVEL, 2" MINIMUM DEPTH LANDSCAPE FABRIC TO COVER BOTTOM AND SIDES OF BOX USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS. GATE VALVE ALL VALVE BOXES IN THE PLANTED AREA SHALL BE STANDARD SIZED RECTANGULAR PLASTIC VALVE BOXES G FINISHED D.G. GRADE EXISTING QUICK COUPLER INSTALLATION EQUIPMENT TO REMAIN IN PLACE. ONLY AND GRAVEL AS DESCRIBED IN THE LEGEND REPLACE THE VALVE BOX, FABRIC, BRICKS, LANDSCAPE FABRIC TO COVER BOTTOM AND SIDES OF BOX CL 3" BRICK SUPPORTS, FOUR (4) REQUIRED PER BOX 3/4" CRUSHED GRAVEL, 2" MINIMUM DEPTH EXISTING QUICK COUPLING VALVE, EXISTING QUICK COUPLER VALVE LOCKING MECHANISM. INSTALL VALVE BOX AT RIGHT ANGLE TRAFFIC RATED, CONCRETE, RECTANGULAR VALVE BOX WITH TRAFFIC RATED CAST IRON HINGED LID WITH DOUBLE TO ADJACENT HARDSCAPE EDGE. H REMOTE CONTROL VALVE I DRIP REMOTE CONTROL VALVE J MANIFOLD BALL VALVE 2" 2" MIN. FINISHED SOIL GRADE IN SHRUB AREAS 2" AND CONTROL STATION # ONTO LID. AND CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL BOX AT PLASTIC RECTANGULAR VALVE BOX WITH PURPLE COLORED T-COVER RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE. HEAT BRAND "RCV" BRICK SUPPORTS, FOUR (4) REQUIRED LASCO #896 PVC UNION SLIP X MIPT, SIZE PER RCV, MIN. P C PVC MAINLINE PIPE RISER*, LENGTH AS REQUIRED 3/4" CRUSHED GRAVEL, 4" MINIMUM DEPTH SCH. 80 PVC 90° ELL FITTING* LANDSCAPE FABRIC TO COVER BOTTOM AND ALL SIDES OF VALVE BOX ELECTRIC REMOTE CONTROL VALVE, SEE LEGEND FOR TYPE TAPE WIRES TO RISER USING BLACK ELECTRICAL TAPE FINISHED SOIL GRADE IN TURF AREAS LATERAL LINE, SIZE PER PLANS, TYPE PVC PIPE, AS 36" WIRE LOOPS AND 3M DBR/Y-6 WATERPROOF WIRE CONNECTORS PVC MAINLINE PIPE* SCH. 80 PVC TEE OR 90° ELL FITTING ON MANIFOLD MAINLINE, ID VALVE NUMBER ID TAG, CHRISTY'S MODEL ID-STD-P1 PER LEGEND TWO (2) PER ASSEMBLY SIZE AS 2" X RCV X RCV (TEE) OR 2" X RCV (ELL) * ABOVE INDICATES SIZE PER RCV LOW VOLTAGE WIRES FOLLOWING MAINLINE PATH TO CONTROLLER PER ASSEMBLY FIPT, SIZE PER RCV, ONE (1) SCH 80 PVC UNION, SLIP X LENGTH AS REQUIRED PVC MAINLINE PIPE RISER*, PVC MAINLINE PIPE* SCH. 80 PVC 90° ELL FITTING* * ABOVE INDICATES SIZE PER RCV 2" X RCV (ELL) SIZE AS 2" X RCV X RCV (TEE) OR FITTING ON MANIFOLD MAINLINE, SCH. 80 PVC TEE OR 90° ELL CHRISTY'S MODEL ID-STD-P1 ID VALVE NUMBER ID TAG, WIRE CONNECTORS 3M DBR/Y-6 WATERPROOF 36" WIRE LOOPS AND BLACK ELECTRICAL TAPE TAPE WIRES TO RISER USING PVC PIPE, BOTTOM AND SIDES OF VALVE BOX LANDSCAPE FABRIC TO COVER THE VALVE, SEE LEGEND FOR TYPE ELECTRIC REMOTE CONTROL 2" MIN. FINISHED SOIL GRADE IN TURF AREAS PLASTIC, INLINE BASKET STRAINER WITH PRESSURE REGULATION PER LEGEND AS LATERAL CP MIN. PLANS, TYPE LINE, SIZE PER FOUR (4) REQUIRED BRICK SUPPORTS, 4" MINIMUM DEPTH 3/4" CRUSHED GRAVEL, 2" FINISHED SOIL GRADE IN SHRUB AREAS 2" SIZE PER RCV, ONE (1) PER ASSEMBLY LASCO #896 PVC UNION, SLIP X MIPT, LOW VOLTAGE WIRES FOLLOWING MAINLINE PATH TO CONTROLLER AND CONTROL STATION # ONTO LID. AND CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL BOX AT PLASTIC RECTANGULAR VALVE BOX WITH PURPLE COLORED T-COVER RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE. HEAT BRAND "RCV" INSTALL LATERAL LIPE IN A SLEEVE WHEN CROSSING PAVEMENT. 1 1/4" MIN. SIZE, 12" BELOW GRADE

PVC SUPPLY HEADER, SEE PLANS,
VALVES AND PIPE SHOWN IN PAVING FOR CLARITY ONLY, ALL TO BE INSTALLED IN PLANTER. DRIPLINE AND PVC HEADER CONNECTION BETWEEN PAVING SURROUNDING AND ADJACENT TO PLANTER AREA TO THE PLANTER EDGE (PAVING) SHALL BE SPACED 4" FROM NOT TO EXCEED SPACING ON THE LEGEND. ROWS ADJACENT AS INDICATED ON THE LEGEND, ADJUST TO EVEN SPACING DRIPLINE TUBING ROWS, SPACING APPROXIMATELY SHOWN ON PLANS EXTENDS TO LIMITS DRIPLINE TUBING PLANS FOR SIZE, 1 1/4" MINIMUM, GRID OF DRIPLINE TUBING, SEE PVC LATERAL LINE TO ADJACENT INSTALL ON DISCHARGE HEADER FLUSH VALVE / INDICATOR HEAD, SHOWN ON PLANS EXTENDS TO LIMITS DRIPLINE TUBING MINIMUM SIZE, 12" BELOW GRADE PVC LATERAL LINE, SEE PLANS, 1 1/4" SEE PLANS, 1 1/4" MINIMUM SIZE, PVC DISCHARGE HEADER, FOR INSTALLATION SEE PLANS AND DETAILS DRIP CONTROL VALVE F 1 1/4" MIN. SIZE, 12" BELOW GRADE PVC SUPPLY HEADER, SEE PLANS, 12" BELOW GRADE, 16" IN INSTALLED 12" BELOW GRADE. DRIPLINE AND PVC HEADER CONNECTION BETWEEN THE PAVING EDGE. ALL ROWS SHALL BE PARALLEL AND AT THE SAME DEPTH. PLANS FOR SIZE, 1 1/4" MINIMUM, GRID OF DRIPLINE TUBING, SEE PVC LATERAL LINE TO ADJACENT INSTALLED 12" BELOW GRADE END FEED SUPPLY HEADER CENTER FEED PVC SUPPLY HEADER FOR TUBING GRID, PER PLANS ACROSS PLANTED AREAS DRIPLINE TUBING EXTEND TUBING GRID (TYPICAL) PLANTED AREAS FOR DRIPLINE PVC HEADERS EXTEND ACROSS PVC SUPPLY AND DISCHARGE HEADERS SHALL BE INSTALLED AT END RUNS OF TUBING, NO MORE THAN 16" FROM THE EDGE OF THE HARDSCAPE. WHERE A TUBING FROM HARDSCAPE EDGE PROVIDE A PERIMETER ROW OF TUBING AROUND ENTIRE PLANTER 4" 16" 4" 16" 4" INSIDE OF PAVEMENT EDGE 4" DISCHARGE HEADER PVC HEADER 16" OFF OF PAVING PVC HEADER 16" OFF OF PAVING ENTIRE PERIMETER OF PLANTING AREA SHALL HAVE A ROW OF DRIP TUBING INSTALLED 4" OFF OF THE EDGE OF THE HARDSCAPE AS SHOWN ABOVE. 4" PVC PIPE FOR LATERALS, SUPPLY HEADERS AND DISCHARGE HEADERS SHALL BE MINIMUM 1 1/4" SIZE, OR SIZED AS SHOWN ON THE PLANS. END RUN HAS ONLY TWO (2) OR THREE (3) ROWS, A PVC DISCHARGE HEADER IS NOT NEEDED AND THE PERIMETER ROW OF TUBING SHALL BE USED FOR THE DISCHARGE. WHERE FOUR (4) OR MORE TUBING ROWS END RUN, A PVC DISCHARGE HEADER IS REQUIRED. NOTE: WHERE QUICK COUPLER VALVE IS FOUND TO BE INSTALLED IN A PLANTED AREA, A 10" ROUND PLASTIC BOX SHALL BE INSTALLED. VALVE BOX TOP 2" ABOVE FINISHED SOIL GRADE IN PLANTED AREA, SET FINISHED GRADE AND SHOWN IN THIS DETAIL. EXISTING GATE VALVE INSTALLATION EQUIPMENT TO REMAIN IN PLACE. ONLY AND GRAVEL AS DESCRIBED IN THE LEGEND REPLACE THE VALVE BOX, FABRIC, BRICKS, AND SHOWN IN THIS DETAIL. EXISTING GATE VALVE INSTALLATION EQUIPMENT TO REMAIN IN PLACE. ONLY AND GRAVEL AS DESCRIBED IN THE LEGEND REPLACE THE VALVE BOX, FABRIC, BRICKS, AND SHOWN IN THIS DETAIL. LOCKING MECHANISM. INSTALL VALVE BOX AT RIGHT ANGLE TRAFFIC RATED, CONCRETE, RECTANGULAR VALVE BOX WITH TRAFFIC RATED CAST IRON HINGED LID WITH DOUBLE TO ADJACENT HARDSCAPE EDGE. WHERE GATE VALVE IS FOUND TO BE INSTALLED IN A PLANTED AREA, A STANDARD SIZE RECTANGULAR PLASTIC BOX SHALL BE INSTALLED. VALVE BOX TOP 2" ABOVE FINISHED SOIL GRADE IN PLANTED AREA, SET FINISHED GRADE FINISHED D.G. GRADE PROTECT IN PLACE WITH NEW BOX PROTECT IN PLACE WITH A NEW BOX WITH TRAFFIC RATED CAST IRON LIDS WITH DOUBLE LOCKING MECHANISM. ALL VALVE BOXES IN THE DECOMPOSED GRANITE PATH SHALL BE TRAFFIC RATED CONCRETE VALVE BOXES ELBOW FITTING, HEADER SIZE BY 1/2" NOTE: SECTION VIEW - N.T.S. PLAN VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX. USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS. ALL VALVE BOXES IN THE PLANTED AREA SHALL BE 10" ROUND PLASTIC VALVE BOXES WITH TRAFFIC RATED CAST IRON LIDS WITH DOUBLE LOCKING MECHANISM. ALL VALVE BOXES IN THE DECOMPOSED GRANITE PATH SHALL BE TRAFFIC RATED CONCRETE VALVE BOXES NOTE: SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX. USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS. ALL VALVE BOXES SHALL BE LOCATED IN THE PLANTED AREAS, NO VALVE BOXES SHALL BE INSTALLED IN THE DECOMPOSED GRANITE PATH. NOTE: USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX. USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS. ALL VALVE BOXES SHALL BE LOCATED IN THE PLANTED AREAS, NO VALVE BOXES SHALL BE INSTALLED IN THE DECOMPOSED GRANITE PATH. NOTE: USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX. USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS. ALL VALVE BOXES SHALL BE LOCATED IN THE PLANTED AREAS, NO VALVE BOXES SHALL BE INSTALLED IN THE DECOMPOSED GRANITE PATH. NOTE: 2" 2" MIN. FINISHED SOIL GRADE IN SHRUB AREAS 2" AND CONTROL STATION # ONTO LID. AND CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL BOX AT PLASTIC RECTANGULAR VALVE BOX WITH PURPLE COLORED T-COVER RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE. HEAT BRAND "RCV" BRICK SUPPORTS, FOUR (4) REQUIRED LASCO #896 PVC UNION SLIP X MIPT, SIZE PER RCV, MIN. 3/4" CRUSHED GRAVEL, 4" MINIMUM DEPTH LANDSCAPE FABRIC TO COVER BOTTOM AND ALL SIDES OF VALVE BOX BRASS, FULL PORT BALL VALVE, SEE LEGEND FOR TYPE FINISHED SOIL GRADE IN TURF AREAS MAINLINE, 2" SIZE PER PLANS, TYPE PVC PIPE, AS PER LEGEND TWO (2) PER ASSEMBLY K VALVE MANIFOLD LAYOUT PLAN VIEW - N.T.S. PURPLE NOZZLE REQUIRED FOR RCW SYSTEMS MAINLINE PIPE TO CONTROL VALVE MANIFOLD B PVC PIPE (LATERAL LINE) TO IRRIGATION SYSTEM, TYPICAL REMOTE CONTROL VALVE ASSEMBLY, TYPICAL 2" CLASS 315 PVC PIPE (PURPLE FOR RCW) FROM ORIGINAL 2" MANIFOLD ISOLATION (BALL) VALVE, ONE (1) CONTROL VALVE MANIFOLD. A MAXIMUM OF FOUR (4) CONTROL VALVES SHALL BE INSTALLED ON ANY ONE (1) REQUIRED PER MANIFOLD 2" CLASS 315 PVC PIPE (PURPLE FOR RCW) MAINLINE MANIFOLD 2" SCH. 80 PVC 90° ELL FITTING, SLIP REMOTE CONTROL VALVE LOCATION, VERIFY IN FIELD. NOTE: FOR IRRIGATION PLAN SEE SHEET I-01. FOR IRRIGATION LEGEND SEE SHEET I-02. FOR IRRIGATION DETAILS SEE SHEETS I-03 AND I-04. 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 21 4-30-24 Page 1829 of 2548 811 W 7th Street, 8th Floor
Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o Job Number HRBT203 Date 04/10/2024 I-04 I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN L THRIVE EVO WIRELESS TRANSMITTER M SIZES 3" AND 4" SIZES 3/4" TO 2 1/2" PIPE SIZES A FINISH SOIL GRADE A B C D D D D D IRRIGATION NON-PRESSURE LATERAL LINE IRRIGATION PRESSURE MAINLINE LOW VOLTAGE CONTROL WIRES, IN CONDUIT IF SPECIFIED ON LEGEND UNDISTURBED SITE SOIL CLEAN, COMPACTED BACKFILL SOIL, CLEAN SOIL PIPE BEDDING, SEE CHART SEPARATION BETWEEN PIPES AND TRENCH WALLS, SEE CHART 12" 18" B18" 24" C18" 24" D4" 4" SIZES 6" AND LARGER 30" 24" 6" SEE SPECIFICATIONS CONTRACTOR IS REQUIRED TO CONTACT 811 OR DIGALERT A MINIMUM OF TWO (2) DAYS PRIOR TO ANY EXCAVATION ON THE PROJECT. DIAL 811 OR LOG ONTO WWW.DIGALERT.ORG. NOTE: UNDER PEDESTRIAN PAVING PIPE SIZES A PAVING, SEE SITE PLANS A B C D D D D D IRRIGATION LATERAL LINE IN SLEEVE IRRIGATION MAINLINE IN SLEEVE LOW VOLTAGE CONTROL WIRES, OR CONDUIT, IN SLEEVE UNDISTURBED SITE SOIL SAND BACKFILL COMPACTED TO CLEAN SOIL PIPE BEDDING, SEE CHART SEPARATION BETWEEN PIPES AND TRENCH WALLS, SEE CHART 12" B24" C24" D4" UNDER VEHICULAR PAVING 36" 36" 6" EQUAL DENSITY OF EXISTING SOIL OR PAVING BASE MATERIAL 24" SLEEVES SHALL BE TWICE THE DIAMETER OF THE PIPE OR WIRE BUNDLE CARRIED WITHIN, EXCEPT WHEN SLEEVES SHALL EXTEND 12" PAST THE EDGE OF PAVING INTO THE PLANTER. USING BELL AND GASKET PIPING WHERE MAINLINE SLEEVES SHALL BE 2.5 TIMES THE SIZE OF THE PIPE. CONTRACTOR IS REQUIRED TO CONTACT 811 OR DIGALERT A MINIMUM OF TWO (2) DAYS PRIOR TO ANY EXCAVATION ON THE PROJECT. DIAL 811 OR LOG ONTO WWW.DIGALERT.ORG. NOTE: 5 THRIVE EVO RECEIVER. SECURE TO THE UNDERSIDE OF A VALVE BOX LID WITH SUPPLIED STAINLESS STEEL FASTENERS, WASHERS, AND NUTS. CONNECT UP TO FOUR NEW OR EXISTING REMOTE CONTROL VALVES TO THE RECEIVER'S FIELD WIRES. REMOVE AND REPLACE THE AC SOLENOID WITH A DC LATCHING SOLENOID COMPATIBLE WITH THE MANUFACTURER OF THE REMOTE CONTROL VALVE. CONNECT PILOT AND COMMON WIRES WITH SUPPLIED DB0/B CONNECTORS. NEW OR EXISTING REMOTE CONTROL VALVE. 1 TM 2345 4 3 2 1 FOR THE INSTALLATION REQUIREMENTS FOR EACH VALVE. DETAIL FOR WIRELESS CONTROL SYSTEM ONLY, SEE VALVE INSTALLATION DETAILS NOTE: Q WIRE CONNECTION KIT SHALL INCLUDE A SCOTCHLOK Y SPRING CONNECTOR, A POLYPROPYLENE TUBE AND A WATERPROOF SEALING GEL. TUBE SHALL BE SUPPLIED PREFILLED WITH GEL. WIRE CONNECTOR SHALL BE A 3M DBR/Y-6 DIRECT BURY SPLICE KIT (U.L. APPROVED). NOTE: INSERTED INTO TUBE UNTIL THE SCOTCHLOK CONNECTOR AND WIRES CONNECTOR PASSES LOCK TABS WATERPROOF GEL POLY TUBE PRE-FILLED WITH ONCE CONNECTOR IS INSERTED LOCK TABS PREVENT WIRE REMOVAL SCOTCHLOK ELECTRICAL SPRING CONNECTOR. WIRES SHALL BE PRE-STRIPPED OF 1/2" OF THE INSULATION PRIOR TO INSERTION CONNECTOR ONTO WIRES TO INTO THE CONNECTIOR. TWIST SEAT FIRMLY. IS INSERTED INTO TUBE WIRES PASS THROUGH GROOVES IN TUBE LID TO ALLOW LID TO CLOSE CLOSE TUBE LID AFTER WIRE LOW VOLTAGE WIRES, 3 MAXIMUM DIRECT BURY SPLICE KIT SHALL BE USED TO ELECTRICALLY CONNECT 2 - 3 #14 OR 2 #12 PRE-STRIPPED COPPER WIRES. LARGER WIRES OR GREATER QUANTITIES OF WIRES SHALL REQUIRE A LARGER APPROVED WIRE CONNECTION. R VALVE BOX LAYOUT BE INSTALLED IN TURF AREAS WITHOUT PRIOR APPROVAL BY THE LANDSCAPE ARCHITECT. NOTE: VALVE BOXES SHALL BE INSTALLED IN SHRUB AND GROUND COVER AREAS. NO VALVES SHALL 18" 18" 18" REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT. 5. BOX LOCATIONS SHALL BE STAKED IN THE FIELD PRIOR TO MAINLINE INSTALLATION FOR QCV BOX, TYPICAL 18"18" ALIGN BOX EDGES BALL VALVE BOX, TYPICAL VALVE BOX, TYPICAL

EDGE OF TURF, WALKWAY, DRIVEWAY OR PAVING
18" COLLAPSE AND / OR DEFORMATION OF VALVE BOXES. 4. AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOXES TO PREVENT THE EVER POSSIBLE, VALVES IN TURF AREAS TO BE APPROVED BY LANDSCAPE ARCHITECT. 2. SET RCV AND VALVE BOX ASSEMBLY IN GROUND COVER OR SHRUB AREAS WHERE FACILITATE SERVICING OF THE VALVE OR EQUIPMENT. 1. CENTER VALVE BOX OVER REMOTE CONTROL VALVE OR DRIP ASSEMBLY TO 3. SET BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO ADJACENT PAVING EDGE. NOTE: QCV RCV A13 RCV A15 RCV A14 BV 120-VOLT INPUT POWER INTO CONTROLLER. REMOTE CONTROL WIRE CONDUIT. 1 2345 1 23 4 5 6 6 THRIVE 4-STATION TRANSMITTER WITH EXTERNAL ANTENNA. OPTIONAL 1/2" CONDUIT FOR STEP-DOWN TRANSFORMER WIRE IF CONTROLLER DOES NOT HAVE A 24 VAC AUXILIARY OUTPUT. 1/2" FLEXIBLE CONDUIT BETWEEN THE IRRIGATION CONTROLLER AND THE EVO TRANSMITTER WITH MALE ADAPTERS AND LOCKNUTS. NEW OR EXISTING MULTI-WIRE IRRIGATION CONTROLLER. NOTE: MOUNT THE EVO TRANSMITTER LEVEL AND PERPENDICULAR TO THE GROUND PLANE. 8" MIN. ALIGN TM O PIPE INSTALLATION P SLEEVE INSTALLATION SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. SECTION VIEW - N.T.S. PLAN VIEW - N.T.S. THRIVE EVO WIRELESS RECEIVER FOR IRRIGATION PLAN SEE SHEET I-01. FOR IRRIGATION LEGEND SEE SHEET I-02. FOR IRRIGATION DETAILS SEE SHEETS I-03 AND I-04. N TSM DOUBLER INSTALLATION TSM DOUBLER TWO (2) RED WIRES FROM DOUBLER CONNECT TO RED WIRES CONNECT TO RED WIRES ONE (1) WHITE WIRE FROM DOUBLER ONE (1) BLACK WIRE FROM DOUBLER RCV A32 RCV A31 RCV A36 COMMON GROUND WIRE FROM CONTROLLER PILOT WIRE FROM CONTROLLER STATION 31 PILOT WIRE FROM CONTROLLER STATION 32 TSM DOUBLER WIRING AT RCV'S 30 31 32 33 34 35 36 C TSM DOUBLER WIRING AT CONTROLLER COMMON GROUND WIRE OUT TO THE EVO THRIVE TRANSMITTER EXISTING RCV WIRE "A31" TO BE RECONNECTED TO CONTROLLER TERMINAL STRIP CONTROLLER STATION 36 AS SHOWN AND EXISTING TO RCV'S "A31" AND "A36", SEE BELOW AND SEE PLANS NEW WIRE ROUTED FROM STATION 35 TO THE TM COMMON GROUND WIRE OUT TO ALL RCV'S ON SYSTEM EVO THRIVE TRANSMITTER EXISING WIRES TO RCV'S "A30", "A32", "A33" AND, "A34" 04/10/24 01/31/26 Job Number HRBT203 Date 04/10/2024 04/10/2024 04/10/2024 22 4-30-24 Page 1830 of 2548 1 CITY OF HERMOSA BEACH

CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
APRIL 2024

Page 1831 of 2548 ends

2 NOTICE INVITING BIDS
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00 PM on MONDAY, MAY 20, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 502 Greenbelt Pedestrian Trail, CIP No. 604 City Wide ADA Improvements, and CIP No. 194 Annual Striping Improvements.

The combined project includes, but is not limited to, construction of an ADA compliant stabilized decomposed granite (DG) trail with landscaping along the Greenbelt from Pier Avenue to 8
th Street, between Valley Drive and Ardmore Ave, removal and installation of trees, construction of ADA curb ramps and sidewalk, installation of City furnished Rapid Flashing Rectangular Beacon, installation of City furnished fitness equipment and pavement striping.

No Pre-Bid Meeting. Contractors are encouraged to walk the job site.

The engineer’s cost estimate for the project is $900,000. License requirement is a valid State of California Contractors License Class “A” OR Class “C-27” AND Class “C-8”.

The duration of the project is 50 working days. All bids must be submitted electronically on Planet Bids Portal, accessible through the City’s webpage at https://www.hermosabeach.gov/our-government/city-clerk/bids-and-proposals where you must first register as a vendor through our Planet Bids Portal. Contract Documents, plans, and specifications will be available for review on Planet Bids. All relevant materials shall be obtained from the link above.

Each proposal must be accompanied by a cash deposit, a certified or cashier's check, or a Bidder's bond, made payable to the City of Hermosa Beach, in an amount not less than 10 percent of the total bid submitted.

The successful Bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the Contract price, a payment bond in the amount of 100 percent of the Contract price, and a warranty bond all in the attached form satisfactory to the City Attorney.

The successful Bidder will also be required to pay the State of California prevailing wage scale as determined by the Department of Industrial Relations, available at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm.

The Contractor must be registered with the Department of Industrial Relations at the time of bid. Contractor’s registration information is available at:
https://www.dir.ca.gov/Public-Works/Contractor-Registration.html The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive and responsible Bidder.

Please submit any questions related to this bid on Planet Bids portal no later than 5:00 PM on THURSDAY, MAY 9, 2024.

Page 1832 of 2548 ends

3 TABLE OF CONTENTS
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
I. PROJECT DESCRIPTION AND UNDERSTANDING ................................................... 5 II. NOTICE TO BIDDERS .................................................................................................. 6 III. INSTRUCTION TO BIDDERS ..................................................................................... 9 IV. BID DOCUMENTS...................................................................................................... 18 A. PROPOSAL...................................................................................................................... 18 B. BID SCHEDULE.............................................................................................................. 19 C. BID BOND ........................................................................................................................ 22 D. BIDDER'S ASSURANCE................................................................................................ 26 E. BIDDER'S DECLARATION........................................................................................... 27 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS...................... 29 G. CERTIFICATION OF PRINCIPAL.............................................................................. 30 H. DECLARATION OF ELIGIBILITY TO CONTRACT............................................... 31 I. NON-COLLUSION DECLARATION ............................................................................ 32 J. REFERENCES OF WORK.............................................................................................. 33 K. SUBCONTRACTORS LIST........................................................................................... 35 L. IRAN CONTRACTING ACT CERTIFICATION........................................................ 38 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION............. 39 V. CONTRACT DOCUMENTS......................................................................................... 40 A. CONTRACT AGREEMENT.......................................................................................... 41 B. AGREEMENT OF INDEMNIFICATION .................................................................... 59 C. EQUALS ........................................................................................................................... 61 D. FAITHFUL PERFORMANCE BOND .......................................................................... 62 E. PAYMENT BOND (LABOR AND MATERIALS) ....................................................... 69 F. GUARANTEE TO THE CITY OF HERMOSA BEACH ............................................. 75 G. GENERAL COMPREHENSIVE LIABLITY ADDITONAL INSURED
ENDORSMENT.................................................................................................................... 76 H. AUTOMOBILE LIABILITY ADDITIONAL INSURED ENDORSEMENT............ 78 I. INSTRUCTIONS FOR COMPLETING, EXECUTING, AND SUBMITTING EVIDENCE OF INSURANCE TO THE OWNER ............................................................ 81 J. WORKER'S COMPENSATION INSURANCE CERTIFICATE................................ 83 K. SUPPLEMENTAL INFORMATION TO BE COMPLETED BY PRINCIPAL........ 84 L. W9 FORM......................................................................................................................... 85

Page 1833 of 2548 ends

4 VI. SPECIAL PROVISIONS
VII. TECHNICAL PROVISIONS
EXHIBIT “A” - SOLID WASTE REPORTING
EXHIBIT “B” - CONSTRUCTION NOTICE TEMPLATE
EXHIBIT “C” - EXERCISE EQUIPMENT SET EXHIBIT “D” - BENCH

Page 1834 of 2548 ends

5 City of Hermosa Beach
CIP NO. 502 GREENBELT PEDESTRIAN TRAIL
CIP NO. 604 CITY WIDE ADA IMPROVEMENTS
CIP NO. 194 ANNUAL STRIPING IMPROVEMENTS
I. PROJECT DESCRIPTION AND UNDERSTANDING
The combined project includes, but is not limited to, construction of an ADA compliant stabilized decomposed granite (DG) trail with landscaping along the Greenbelt from Pier Avenue to 8th Street, between Valley Drive and Ardmore Ave, removal and installation of trees, construction of ADA curb ramps and sidewalk, installation of City furnished Rapid Flashing Rectangular Beacon, installation of City furnished fitness equipment and pavement striping.

Contractor will need to secure entire work site with temporary construction fencing during the duration of the project, closing access to pedestrians.

Page 1835 of 2548 ends

6 II. NOTICE TO BIDDERS
Prospective Bidder: To be considered as a responsive Bidder you must register on Planet Bids portal through the city’s website at https://www.hermosabeach.gov/ourgovernment/city-clerk/bids-and-proposals .

Pre-bid Meeting: There will be no pre-bid meeting. Each Bidder is strongly encouraged to walk the job site. Each prospective Biddershall familiarize itself with the plans and work site(s) to satisfy itself that it has the abilities and resources to complete the work.

Bid Documents: Bid Documents, including but not limited to specifications and proposal forms, will be available for download on Planet Bids Portal, accessible through the webpage at:
https://pbsystem.planetbids.com/portal/51313/bo/bo-search.

To the extent required by Section 20103.7 of the Public Contract Code, upon request from a Contractor plan room service, the City shall provide an electronic copy of the Contract Documents at no charge to the Contractor plan room.

It is the responsibility of each prospective Bidder to download and print all bid documents for review and to verify the completeness of Bid Documents before submitting a bid. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Bid Documents.

Questions: All questions regarding this bid shall be submitted through Planet Bids no later than MAY 9, 2024 at 5:00 PM. Proposers shall not contact City personnel or Elected Officials with any questions or clarifications concerning this Invitation for Bids other than through Planet Bids. Any City response for this Bid that is not posted through Planet Bids is unauthorized and will be considered invalid.

Submittal of Bids: Electronic bids shall be submitted through Planet Bids until MAY 20, 2024, at 2:00 PM at which time they will be publicly opened and read in the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA. All bids shall be valid for a period of 90 calendar days after the bid opening date.

Bidder’s Guarantee: Each bid must be accompanied by cash or a certified check or a cashier's check or Bidder's bond made payable to the City of Hermosa Beach for an amount equal to at least ten percent (10%) of the bid price. In accordance with Public Contract Code Section 20170, the Bidder’s Bond shall be issued by a surety company admitted to do business in the State of California. Further, in accordance with Public Contract Code Section 20172, such guarantee shall be forfeited should the Bidder to whom the Contract is awarded fail to enter into the Contract within the specified time.

Payment, Performance Bonds: The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein and shall be secured from a surety company that meets all State of California bonding

Page 1836 of 2548 ends

7 requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.

Substitution of Securities: Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by the City to ensure its performance under the Contract.

Contractor License: In accordance with provisions of Section 3300 of the California Public Contract Code, City of Hermosa Beach has determined that the Contractor shall possess a valid “A” California Contractor’s License OR a valid “C-27” California Contractor’s License AND a valid “C-8” California Contractor’s License. Failure to possess such license may render the bid as non-responsive and bar the award of the Contract to that nonresponsive Bidder.

Prevailing Wages: Pursuant to Labor Code Section 1773, the Contractor shall pay the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Los Angeles County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this Contract. A copy of these prevailing wage rates may be obtained by visiting: https://www.dir.ca.gov/PublicWorks/Prevailing-Wage.html In addition, a copy of the prevailing rate of per diem wages will be made available at the City’s Public Works Department upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory for the Bidder to whom the Contract is awarded, and for any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor, and debarment of Contractors and subcontractors.

Contractor’s Registration with the Department of Industrial Relations (DIR): The Bidder’s attention is directed to Labor Code Section 1725.5, which provides that a Contractor or subcontractor shall not be qualified to bid on, be listed in a Bid proposal, subject to the requirements of Public Contract Code Section 4104, or engage in the performance of any Contract that is subject to Labor Code Section 1720 et seq., unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. No Bid will be accepted, nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project.

Compliance Monitoring and Enforcement: Contractor’s performance of the Work described in the Notice Inviting Bids is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and applicable law in its Bid.

Award of Contract: The City shall award the Contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the total base bid. City reserves

Page 1837 of 2548 ends

8 the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

Page 1838 of 2548 ends

9 III. INSTRUCTION TO BIDDERS
Form of Proposal: The proposal shall be fully executed and submitted on the forms provided by the City. Proposal forms can be obtained from Planet Bids.

Signatures: All places where signatures are required must be fully executed.

Proposal: Documents which shall be signed and returned to the City with the Bid Proposal are:

A. Proposal
B. Bid Schedule
C. Bid Bond
D. Bidder’s Assurance
E. Bidder’s Declaration
F. Certificate of Non-Discrimination by Contractors
G. Certification of Principal
H. Declaration of Eligibility to Contract
I. Non-Collusion Declaration
J. References for Work
K. SubContractor List
L. Iran Contracting Act Certification
M. Public Works Contractor Registration Certification
N. Addenda (if applicable)
Contract: Documents which shall be signed and returned to the City by the successful Bidder within 10 days of notification of intent to award Contract:

A. Contract Agreement
B. Agreement of Indemnification and Hold Harmless and Waiver of Subrogation and Contribution
C. Equals
D. Faithful Performance Bond
E. Payment Bond (Labor and Materials)
F. Guarantee to the City of Hermosa Beach
G. General Comprehensive Liability Additional Insured Endorsement H. Automobile Liability Additional Insured Endorsement
I. Instructions for Completing, Executing, and Submitting Evidence of Insurance to the Owner
J. Worker’s Compensation Insurance Certificate
K. Supplemental Information to be Completed by Principal L. W-9 Form
M. Copy of City Business License
Delivery of Proposal: Each Bid prepared by Bidder shall be completed in itself and shall be submitted electronically through Planet Bids.

Page 1839 of 2548 ends

10 Prevailing Wage: In accordance with the provisions of Section 1770 et seq., of the Labor Code, the Director of the Department of Industrial Relations of the State of California has ascertained the general prevailing rate of wages which is the minimum amount which shall be paid to all workers employed to perform the work. A copy of the determination is on file in the office of the City Clerk and is hereby incorporated herein and made a part hereof as though fully set forth herein.

A copy of the determination will be made available to any interested person upon request and shall be posted at the job site.

Overtime: As per Labor Code Section 1810 et seq., eight (8) hours is the legal working day.

The Contractor shall pay overtime for each worker who works in excess of the legal working day.

Payment: Refer to the Contract Agreement for payment information. Contractor shall submit progress payment requests on City approved form.

Required Bonds: Prior to the execution of the Contract, the successful Bidder shall file with the City surety bonds in the amounts and for the purposes noted below. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure section 995.120. Contractor shall pay all premiums and costs thereof and incidental thereto.

Per Civil Code section 3247, a Payment Bond is required if the Contract is for more than $25,000.

The successful Bidder shall give the following surety bonds with good and sufficient sureties:
"Payment Bond – Labor and Materials" shall be so conditioned as to insure to the benefit of persons furnishing materials for or performing labor upon the work. Bond to be in the sum of not less than 100% of the Contract price to assure the claims of materialmen supplying materials to Contractor, and for payment to laborers and subcontractors employed on the project.
“Faithful Performance Bond" in the sum of not less than 100% of the Contract price to assure the faithful performance of the Contract; shall be conditioned as to assure the faithful performance by the Contractor of all work under said Contract, in a manner that is satisfactory and acceptable to the City; that all materials and workmanship supplied by him will be free from original or developed defects; and that should original or developed defects or failures appear, the Contractor shall, at his own expense, make good such defects and failures and make all replacements and adjustments required, within a reasonable time after being notified by the City to do so, and to the satisfaction of the City.

Rejection of Proposals: The City reserves the right to reject any and all proposals and to waive any minor or technical discrepancies or irregularities. Proposals may be rejected if they show any alteration of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind.

Agents: When proposals are signed by an agent, other than the officer or officers of a corporation authorized to sign Contracts on its behalf or a member of a partnership, a "Power of Attorney" must be on file with the City prior to opening bids or shall be submitted with the proposal; otherwise, the proposal will be rejected as irregular and unauthorized.

Page 1840 of 2548 ends
← All documents from this meeting