Cities Index.
Agenda packet

Hermosa Beach City Council
July 9, 2024

Document
Agenda packet
Meeting
July 9, 2024
Body
Hermosa Beach City Council
Pages
2,548
Original file
267.1 MB
Text extracted from the city's file for reading and search. Open the original on pub-hermosabeach.escribemeetings.com. That file is the official record.

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -8 C. Before any workers perform Abatement Work or Work of this section where the P.E.L. is exceeded, submit proof of CDPH training and certification. No Work shall be performed until the Owner Consultant has reviewed and approved CDPH training and certifications.

D. Workers shall be in personal possession of a wallet CDPH certification card at times while they are performing Abatement Work on the Project site.

E. Workers performing lead Abatement, Lead Related Construction Work, or disturbance of Lead Containing Paint where the exposure level exceeds the P.E.L., shall possess current CDPH certification and at least one CDPH Certified supervisor shall be available as required by Title 17, CCR subsection 36100.

1.09 TRAINING
A. Lead Related Construction Work shall be performed by personnel with the following training, as applicable:

1. The Lead Related Construction Work, specified herein, shall be performed by individuals trained and qualified in the techniques of lead-related construction, handling, disposal of lead-based and Lead Containing Paint, and the subsequent cleaning of contaminated areas. These individuals must comply with the applicable Environmental Protection Agency (EPA), Renovation, Repair and Painting (RRP) programs lead-related construction course that satisfies the requirements specified in 40 CFR, Part 745, Section 745., and must be capable of and willing to perform the Work of this section.

2. The Lead Related Construction Work, specified herein, shall be performed by a company, partnership, corporation, sole proprietorship or individual doing business, association, or other business entity; a Federal, State, Tribal, or local government agency; or a nonprofit organization, shall satisfy the requirements specified in 40 CFR, Part 745, Section 745.89, as a Lead-Safe Certified Firm.

3. Lead Abatement Work, specified herein, shall be performed by individuals trained and qualified in the techniques of lead abatement and will receive CDPH accredited training and certification, and must be capable of and willing to perform the Work of this section.

2. Training specific to the performance of Lead Related Construction Work shall be provided to employees prior to performing the Work of this section.

3. Training specific to the operation and use of fire extinguishers.

1.10 EXPOSURE ASSESSMENT
A. Disturbance of Lead Containing Paint, as defined in this Specification, disturbed by tasks not included in Title 8, CCR Section 1532.1, Subsection (d)(2), shall require worker-exposure monitoring upon initiation of the Work. The workers performing these tasks shall be trained in accordance with the Hazard Communications Standard, Section 5194, including but not limited to, the requirements concerning warning signs and labels, Safety Data Sheets (SDS), and employee information and training.

B. Provide an exposure assessment where the workers are performing Lead Related Construction Work. If historical data, collected within the 12 months prior to the Work performed, indicates worker exposure is below the P.E.L., and the Work being performed closely resembles the process, type of material, control methods, work practices, and environmental conditions, additional exposure assessment is not required.

Page 741 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -9 C. For Lead Related Construction Work where there is objective data or an exposure assessment demonstrating that the Lead Based Paint, or a specific process, operation or activity other than Abatement involving lead cannot result in employee exposure to lead at or above the P.E.L. during the specific process or handling, employees trained as required by Title 8, CCR Section 1532.1, including the training topics of the Lead-Safe Schools Program, may perform the Lead Related Construction Work.

D. Where Work being performed indicates an exposure above the Action Level, each employee is required to have current blood lead level and Zinc Protoporphorin testing, medical clearance for negative pressure respirator use, and respirator fit testing.

E. If there is no objective data or a negative exposure assessment fulfilling the above requirements, Lead Related Construction Work identified as a trigger task by Title 8, CCR 1532.1 shall be performed by workers who have received training as required by Title 8 CCR, Section 1532.1.

This training shall, at a minimum, include the training topics of the Lead Safe Schools Program.

An exposure assessment is required to be performed upon initiation of Work.

F. The required exposure assessment shall not exceed 12 months from the date the samples were collected to the date the Lead Related Construction Work or disturbance of Lead Containing Paint is performed.

G. The submission and review by the Owner Consultant of the objective data or exposure assessment is required prior to performing Lead Related Construction Work.

1.11 SUBMITTALS
A. Provide in accordance with Division 01 and this section.

B. Prior to performing the Work of this section, submit the following procedures to the Owner Consultant:

1. An abatement plan including, but not limited to:
a. A detailed written description of the measures and management procedures, including the containment that will be utilized during Abatement to prevent exposure to lead hazards. Shop Drawings shall indicate the containment locations.
b. A detailed written description of the Abatement, including methods of Abatement, locations of rooms and building Component where Abatement is planned.

2. Required air monitoring procedures(Cal/OSHAmandatory and SCAQMD permitsfor air filtering equipment).

3. Decontamination procedures for personnel, Work Area, and equipment.

4. Procedures for handling and disposing of waste materials, including disposal facility.

5. Provide the procedures to be used for capturing debris while disturbing overhead materials.

6. Procedures for final Decontamination and cleanup.

Page 742 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -10

7. Procedures for dealing with heat stress during Abatement.

8. Emergency procedures during Abatement.

C. Prior to performing Abatement Work of thissection, submit the following Shop Drawingsto the Owner Consultant:

1. Preparation of Work Area.

2. Layout and construction of Decontamination Enclosure System and barriers for isolation of the Work Area described in this Specification and required by applicable regulations.

D. Prior to performing the Work of this section, submit the following Product Data to the Owner Consultant:

1. Product Data relative to personal protective equipment including respiratory protection and protective clothing.

2. Material safety data sheets and technical specifications for proposed materials.

E. Prior to performing the Work of this section, submit the following notifications to the Owner Consultant:

1. Evidence of notification to Cal/OSHA as required by Title 8 CCR, Section 1532.1, where applicable.

2. Notify CDPHno less than five days in advance of Abatement by submitting an Abatement of Lead Hazard Notification, CDPHForm 8551.

F. Prior to performing the Work of this section, submit the following documentation to the Owner Consultant:

1. A list of employees who will participate in the Project, including delineation of experience, training, and assigned responsibilities during the Project.

2. Submit proof satisfactory to the Owner Consultant that required permits, site location, and arrangements for transport and disposal of lead containing waste has been performed in accordance with Federal, State, and local regulations.

3. Submit proof of training for each worker who will perform Abatement or Lead Related Construction Work.

4. Submit manufacturer’s certification that HEPA Vacuums, air filtration units and other local exhaust ventilation equipment conform to ANSI Z9.2, as applicable.

5. When HEPA Vacuums are utilized on the Project, provide the maintenance and filter change log for these before they are brought onto the Project site.

6. Provide the current SCAQMD permit for each HEPA Vacuum and Portable Mechanical Ventilation System before they are brought onto the Project site.

7. Where biological monitoring is required, submit test result documentation verifying employees have completed blood lead level and Zinc Protoporphorin tests in accordance with Title 8 CCR, Section 1532.1.

Page 743 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -11

8. Workers are required to submit a signed Code of Conduct form.

G. Prior to performing the Work of this section, submit the following Samples to the Owner Consultant:

1. Submit a Sample of forms to be used in documenting the Work of this section.

H. Prior to performing the Work of this section, submit the following schedule to the Owner Consultant:

1. An intended sequence of Work and construction schedule. Coordinate both the sequence and durations with the Owner.

I. Prior to performing the Work of this section, submit other required items to the Owner Consultant.

J. During the performance of the Work of this section, submit the following documentation to the Owner Consultant:

1. Submit documentation from a physician certifying that employees who wear a negative pressure respirator are medically cleared to do so without suffering adverse health effects as required by DOSH regulations. The certification shall state that the employee or agent may perform Lead Related Construction Work and wear a negative pressure respirator without restrictions. Provide information to the examining physician about unusual conditions in the workplace environment that may impact the employee’s ability to perform Work activities.

2. During the performance of the Work of this section, and before additional supervisors or workers are permitted to perform the Work of this section, submit proof of CDPHtraining and certification, where applicable. No additional supervisors or workers are permitted upon the Project site until the Owner Consultant has approved the CDPHtraining and certifications, when required.

3. Submit weekly job progress reports detailing Abatement and Lead Related Construction Work activities for Projects that will exceed thirty days. Include review of progress with respect to previously established Milestones and schedules, major problems and action taken, injury reports, equipment breakdown, and air and/or wipe sampling results.

4. Within five workdays of transport and disposal, submit copies of transport manifests, disposal receipts, analytical data, and weight certificates for hazardous waste removed from the Work Area during the Lead Related Construction Work and/or Abatement Work. Weight certificates shall indicate by pounds the net weight of waste disposed of from the Project site as indicated on the associated manifest.

5. Submit daily, copies of Abatement Work site entry logbooks with information on worker and visitor access.

6. Submit logs on a weekly basis documenting filter changes on respirators, HEPA vacuums, HEPA filtered ventilation units, water filtration units, and other approved engineering controls, as applicable.

7. Submit results of air and/or wipe sampling data (as applicable) collected during the course of the Abatement and Lead Related Construction Work including DOSH compliance air monitoring results.

Page 744 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -12 K. During the performance of the Work of this section, submit other required items.

1.12 PRE-ABATEMENT MEETING
A. Attend a meeting to be held prior to the commencement of the Work of this section. Attending this meeting shall be representatives of the Owner, the Owner Consultant if applicable, and the testing and monitoring personnel who shall actually participate in the testing and monitoring program. Secure the attendance of the individual who will be the Project site competent person for the Abatement Work.

B. At this meeting provide required submittals except for those to be submitted during progress of the Work. In addition, provide detailed information concerning:

1. Preparation of Work Area and Shop Drawings.

2. Personal protective equipment, including respiratory protection and protective clothing.

3. Employees who will participate in the Project, including delineation of experience, training, and assigned responsibilities during the Work.

4. Decontamination procedures for personnel, Work Area, and equipment.

5. Abatement methods and procedures to be provided.

6. Required air monitoring procedures (pre-Abatement, Cal/OSHA mandatory, and SCAQMD requirement).

7. Procedures for handling and disposing of waste materials, including disposal facility.

8. Procedures for final Decontamination and cleanup.

9. A sequence of Work activities and performance schedule.

10. Procedures for dealing with heat stress.

11. Emergency procedures.

PART 2 – PRODUCTS

2.01 MATERIALS AND EQUIPMENT
A. Products: The following products have been specifically approved for use ass encapsulants/lockdown or bridging agents for Owner asbestos abatement and asbestos related construction projects and lead abatement and lead abatement related construction projects. Products not approved by the Owner shall not be used.

1. L-B-C Lead Barrier Compound 5400 be Fiberlock Technologies, Inc.; coating encapsulant.

B. Materials:

1. Deliver materialsin the originalsealed packages, containers, or bundles bearing the name of the manufacturer and brand name.

Page 745 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -13

2. Store materials, subject to damage off the ground, away from wet or damp surfaces, and under cover sufficient enough to prevent damage or contamination. Replacement materials shall be stored outside of the Work Area until area is cleared for normal occupancy.

3. Damaged, deteriorating, or previously used materials shall not be furnished and shall be removed from the Project site and legally disposed of.

4. A sufficient supply of disposable mops, rags, and sponges for Work Area Decontamination shall be provided.

5. Unless otherwise specified, the Owner will provide water for construction purposes.

Connect to existing system as required.

6. Products brought onto the Project site shall be accompanied by their respective Material Safety Data Sheet, which shall be maintained on the Project site.

7. Plastic, polyethylene sheeting or visqueen shall be a fire retardant type. Provide documentation from the manufacturer verifying compliance with this requirement.

8. Polyethylene sheeting furnished for the Decontamination Enclosure System shall be opaque white or black in color and shall be a minimum of 6-mil thick.

9. Surfactant (wetting agent) shall be a material that, when tested, demonstrates a surface tension of 29 dynes/cm as tested in its properly mixed concentration, using ASTM method D1331-56-"Surface and Interfacial Tension of Solutions of Surface Active Agents." Where Work Area temperature may cause freezing of the Amended Water solution, the addition of approved antifreeze in a manufacturer recommended amount is permitted.

B. Equipment:

1. Disposal bags shall be of 6-mil polyethylene, pre-printed with labels as required by applicable Cal/OSHA and DOT requirements.

2. Provide labels as per DOT requirements for disposal containers.

3. Provide warning signs as required by Cal/OSHA.

4. Disposal containers shall meet requirements of Title 22, CCR.

5. Provide a sufficient supply of scaffolds, ladders, lifts, and hand tools, as needed to complete the Work.

6. Provide sprayers with pumps capable of providing amended water in sufficient quantity to adequately wet the material to be abated or for Lead Related Construction Work.

7. Provide a sufficient supply of HEPA filtered vacuumsto maintain a clean environment in compliance with this section.

8. When an enclosure requiring negative pressure is specified, a sufficient quantity of airfiltration ventilation units furnished with HEPA filtration and operated in accordance with ANSI Z9.2and EPA guidance documents shall be utilized to provide one workplace air change every 15 minutes and creating a pressure differential of -0.02 inches of water everywhere within the enclosure when compared to the area outside the enclosure. A log

Page 746 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -14 documenting the filter change history of each unit shall be required before use, and any unit without this log shall have filters changed and the unit decontaminated.

9. When rental equipment isto be used in Abatement areas or to transport lead contaminated waste, a written notification concerning the intended use of the rental equipment shall be provided to the rental agency with a copy submitted to the Owner.

10. When performing chemical Removal, provide portable eyewash station(s) that meet ANSI standards and are accessible to workers within 10 seconds.

11. Additional safety equipment, as necessary, shall be provided to workers and authorized visitors.

12. Equipment delivered to the Project site shall be free of debris suspect of containing lead.

No equipment with suspect debris in or on it shall be permitted on Owner properties and/or the Project site.

13. When roll-off disposal containers are delivered to a Project site, four wheels of each container shall be moved and rested upon a minimum size sheet of plywood of 4-foot by 4-foot by ¾ inch.

14. Lighting shall be provided in an amount sufficient to illuminate the Work Area for the purpose of safe visual working conditions and to permit examination of surfaces where Work is performed.

2.02 EMPLOYEE PERSONAL PROTECTIVE EQUIPMENT
A. Respiratory Protection:

1. Submit NIOSH approvals for respiratory protective devices utilized on the Project site.

Include manufacturer certification of HEPA filtration capabilities for cartridges and filters. Filter cartridges shall be furnished with the NIOSH P-100 designation.

2. Provide respiratory protection to employees in compliance with CCR Title 8, Sections 1532.1 and 5144, as determined by the employee exposure assessment.

3. In the absence of an exposure assessment, base respiratory protection on the requirements of Title 8, CCR Section 1532.1, specifically subsection (d).

4. In addition to P-100 filters, provide the appropriate respirator filter cartridges for exposure to other airborne contaminants generated during the Abatement process.

5. Provide authorized visitors with a respirator and cartridges sufficient to protect individuals from exposure to hazardous environments generated during the Abatement activity.

B. Fit Testing:

1. Perform fit testing in accordance with Title 8 CCR, Section 5144.

2. Submit documentation of respirator fit testing for individuals entering the Work Area.

3. Maintain and submit to the Owner a copy of the written respiratory protection program.

Page 747 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -15 C. Personal Protective Clothing and Equipment:

1. Provide eye protection to employees sufficient to protect employees from debris during work progress when full-face respirators are not being utilized.

2. Provide and require the use of eye protection when employees are working with a material that may splash or fragment, as specified by the Material Safety Data Sheet for a given product, or as required by Title 8, CCR.

3. Spectacle kits and eyeglasses must be provided for employees who wear glasses and who must wear full-face piece respirators. Provide respirators that have been tested and approved by the National Institute of Occupational Safety and Health for use in leadcontaminated atmospheres.

4. Provide full-body disposable protective clothing, including head, body, and foot coverings to workers and authorized visitors who enter the Work Area, in sizes adequate to accommodate movement without tearing. A new suit shall be provided and donned for each separate entry.

5. If washable clothing is to be worn underneath disposable protective clothing, it shall be provided to Abatement workers.

6. Provide a clean staging area for workers and others to store street clothes and personal protective equipment.

7. Disposal suits shall be collected in an appropriate disposal container at the entrance of the Abatement Work Area.

8. Abatement workers are required to wear nonskid footwear sufficient to protect them from workplace hazards. Disposable clothing shall be adequately sealed to the footwear to prevent body contamination.

9. Hand protection shall be provided, and workers shall be required to use lotion sufficient quantities to protect the worker when chemicals or other physical hazards exist.

10. As required by the Work site and applicable safety regulations, provide head protection and require the use thereof.

11. Worker protection equipment shall be ANSI approved.

PART 3 - EXECUTION

3.01 LEAD RELATED CONSTRUCTION WORK
A. Work Area Preparation and Work Practices:

1. Where exposure monitoring indicates Worker exposure is below the P.E.L., comply with the requirements of this section and the “Monitoring” section of this Specification.

2. Disturbance of lead containing materials shall be performed using wet methods.

3. Work requiring overhead disturbances shall require a means of capturing debris, thus preventing an uncontrolled release on the worker or the surfaces below.

Page 748 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -16

4. For disturbances utilizing local exhaust dust collection devices the equipment shall be designed and furnished with a HEPA filtered vacuum attachment approved by the manufacturer.

5. Where Components are to be removed, loose Lead Based Paint and Lead Containing Paint shall be removed by manual means using wet methods.

6. Where a Component is attached and painted onto another surface and the Component is to be removed from the adjoining surface the paint shall be cut with a razor knife to reduce the potential of paint chip debris during Component removal.

7. If a Component being removed will be disposed of rather than reinstalled, manually cut the Component into manageable sections for disposal using wet methods or mechanically cut using a manufactured approved HEPA filtered local exhaust dust collector.

8. If a Component is to be reused, loose paint or rough edges may require scraping or sanding. Scraping or sanding must be performed manually using wet methods or mechanically with a manufactured approved HEPA filtered local exhaust attachment.

9. For solid core surfaces where penetration or welding are required the lead containing material shall be removed from the area impacted using wet methods. Layers of Paint shall be removed before impact to the surface commences.

B. Clean Up Procedures:

1. During the entire process of Lead Related Construction Work, clean debris generated using wet methods and/or HEPA Vacuuming.

2. At the completion of the Lead Related Construction Work, clean surfaces within the impacted Work Area.

3. When HEPA filtered Vacuums are utilized, vacuum from the area of impact to the outer perimeter of the polyethylene sheeting to remove visible debris. If vacuuming cannot remove visible debris, wet wiping will also be required.

4. When wet wiping the Work Area, wipe from the area of impact to the outer perimeter of the polyethylene sheeting to remove visible debris.

5. Tools and equipment utilized in the Work Area shall be wet wiped to remove visible debris.

3.02 ABATEMENT
A. Work Area Preparation:

1. Clean areas to be isolated by HEPA Vacuum prior to installation of polyethylene sheeting.

2. Seal the Work Area with a layer of 6 mil thick polyethylene sheeting prior to any Lead Based or Lead Containing Paint Removal or disturbance by covering vents, windows, door openings, and any non-Moveable Objects such as lockers, etcetera.

3. Install a minimum of two layers of 6 mil thick polyethylene sheets on floors, fastened by waterproof tape and other means as necessary to secure the sheeting.

Page 749 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -17

4. The covering on windows, exterior doors, and vents shall be installed from the outside to facilitate Work on them from the inside.

B. Decontamination Enclosure System:

1. At a minimum a two-stage Decontamination Enclosure System consisting of a compartment for Decontamination and a Clean Room shall be constructed and used.

2. Unless otherwise specified, the Decontamination Enclosure System shall be adjacent to the Abatement area.

3. Other enclosure methods may be used if submitted and approved by the Owner Consultant.

C. Removal and Replacement Substrates with Lead Based Paint:

1. Except as noted in the Specifications and Drawings, replace substrate with material of the same or better quality. Substrates include, but are not limited to doors, windows, moldings, casements, mantels, trims, skirting, baseboards, and associated hardware and fasteners.

2. Areas adjacent to substrate removal shall be protected from damage. Damages shall be repaired or replaced to original condition.

3. Substrates that are removed for replacement shall be wrapped and stored for disposal.

Disposal shall be in accordance with the applicable codes and sections of this Specification.

4. After removal, the areas disturbed shall be cleaned and a Clearance Inspection performed in accordance with the procedures described in this Specification.

D. Abrasive Removers – Machine Sanders:

1. Machine sanders shall be furnished with a HEPA Vacuum system approved by the manufacturer.

2. Sanding shall only be performed on flat surfaces that allow the HEPA Vacuum dust collection attachment to come into tight contact with the surface being sanded.

3. Remove Lead Based Paint down to the bare substrate surface. If the pigment cannot be removed without damaging the substrate, submit a Request for Clarification to the Owner Consultant.

4. Protect adjacent surfaces from damage from machine sanding. Repair and/or replace damaged surfaces.

E. Chemical Removal-On-Site Chemical Removal:

1. No chemical Removal shall be performed on interior surfaces unless specifically called for and designed in the Specifications or the Abatement plan of the Project.

2. Owner approved chemical removers shall be compatible with and harmless to the substrate. On masonry surfaces chemical removers shall contain anti-stain formulation that inhibits discoloration.

Page 750 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -18

3. Chemical Removal Agent Neutralizer: Use chemical Removal agent neutralizers on exterior surfaces only. Neutralizers shall be compatible with and not harmful to the substrate. Neutralizersshall be compatible with the Removal agent that has been applied to the surface substrate.

4. Apply chemical Removal agents and neutralizers in accordance with the recommendations of the manufacturer and the following:
a. Adhere to health and safety regulations and other Specification section requirements. Stripping agents shall not be allowed to penetrate wood or other fibrous substrates.
b. Remove the softened paint by scraping or wire brushing. c. Protect adjacent areas from damage from Removal agent during the course of Work.

F. Chemical Removal – Off-Site Chemical Removal – Structures of Historical Significance Only:

1. Remove and transport Lead Based Painted Component in accordance with this Specification. Transport the Component to an off-site location. Remove Lead Based Paint by chemical Removal. Neutralize and clean the Component. Return Component to the Project site free of lead-containing materials and reinstall.

2. Take extreme care in removing component to be taken off-site, to prevent damage. In addition:
a. Component shall be marked and identified using an inconspicuous engraving, to insure reinstallation in original location.
b. Hardware associated with a component shall be bagged and marked. c. If required, hardware shall be chemically stripped, cleaned, or reconditioned. d. Dispose of hazardous waste generated by the off-site stripping of Lead Based Paint as required by federal, state, and local regulations. e. Do not transport hazardous waste to Owner properties and/or facilities. f. Protect the component and the adjacent areas from which component are removed from damage by the removal and reinstallation procedures.

G. Water Jet Washing:

1. The purpose of the Water Jet Washing process is to remove Lead-Based and Lead Containing Paint from exterior masonry substrate.

2. If this procedure is selected,submit a Work plan to the Owner Consultant which includes, but is not limited to, interim controls, paint stabilization, and capture of waste water.

H. Encapsulation – Interior and Exterior - Coated Sealer System:

1. Materials: - Elastic acrylic coating shall be heavy bodied and warranted by the manufacturer to be compatible with the substrate. Elastic acrylic coating shall be long lasting and resist cracking, peeling, algae, and fungus.

Page 751 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -19

2. Submittal: - Submit two Samples, 5 ½-inch by 8-inch of the encapsulation material to the Owner Consultant.

3. Encapsulation coatings shall be applied in accordance with the manufacturer’s recommendations and the following conditions:
a. Remove surface dust and debris by scrubbing with a non-residue detergent solution, and rinsing. Remove loose paint until a sound, intact edge is achieved.

Remove and replace loose plaster prior to the coating application. Proper safety procedures and lead dust control method in this Specification must be utilized. b. Apply Encapsulation coatings to the substrate in a continuous coat to seal the surface being coated. The number of coats required and coverage rates shall be in accordance with the manufacturer’s recommendations.
c. Repair materials that lift and peel after the application of the Encapsulation coating by scraping until a sound surface is obtained. The edges shall be feathered, and a reapplication of an Encapsulation coating shall be applied. d. Remove, or cover as directed, existing fixtures located on surface to be coated, including but not limited to, electrical receptacles, switches, exhaust fans, and hardware.
e. Protect adjacent surfaces and existing fixtures from damage by coating system.

Damages to adjacent surfaces and existing fixtures due to lack of protection or improperly applied protection shall be repaired and/or replaced.

I. Encapsulation – Interior and Exterior - Flexible Wall Covering:

1. Materials: Wall covering shall be a reinforced fiber type that forms a secure bond with the substrate, resistant to peeling and formation of mold. The wall covering system shall form a seal over the substrate to which it is applied and not allow the passage of substrate dust into the environment.

2. Submittal: Prior to the start of Work, submit to the Owner Consultant for approval, manufacturer’s descriptive literature, and two 5 ½-inch by 8-inch Samples of each wall covering system.

3. Install Encapsulation covering in accordance with manufacturer’s installation instructions and the following provisions:
a. Remove foreign material by washing surfaces with a detergent solution. Remove loose plaster, loose paint, and loose wallpaper. Utilize dust control methods described in this Specification.
b. Repair larger damaged areas flush with surrounding wall surfaces prior to installation of wall covering system.

J. Enclosure Procedures - Gypsum Wallboard (interior surfaces only), plywood paneling, other enclosures of exterior substrate:

1. Surface preparation: Remove foreign material by wash-down with a non-residue detergent solution. Remove loose plaster, loose paint, and loose wallpaper in accordance with this Specification to stabilize the painted surfaces.

Page 752 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -20

2. Affix warning labels stating surface contains “LEAD-BASED PAINT” to the surface prior to being enclosed. Labels shall be 3-inch by 5-inch and placed four feet apart at approximately five foot high on the surface being enclosed.

3. Install selected enclosure material in accordance with the relevant section of the Specification. Any disturbance to Lead Based Paint in the execution of this section shall comply with the Lead Related Construction Work section of this Specification.

K. Soil Abatement:

1. Surface Contamination:
a. Remove Lead Contaminated Soil from the locations and to a depth specified in the scope of Work.
b. In the absence of a specified depth of soil removal identified in the scope of Work, submit, prior to the bid, a Request for Clarification regarding the quantity of soil to be removed.
c. Submit a written soil abatement plan prior to initiation of the Project. d. No soil abatement shall proceed until the Work plan has written approval by the Owner Consultant.
e. Refer to the waste handling and transportation section of this Specification for the handling, characterization, and disposal of waste.

L. Alternate Procedures:

1. If specified procedures cannot be utilized, a request must be made in writing to the Owner Consultant establishing details of the problem encountered and recommended alternatives.

2. Alternate procedures shall provide equivalent or greater protection than procedures that they replace.

3. Prior to implementation, alternative procedures shall be submitted and approved in writing by the Owner Consultant.

M. Clean Up Procedures

1. During the entire process of the Work of this section, perform continuous cleaning of debris generated using wet methods and/or HEPA filtered vacuuming.

2. At the completion of the Work of this section, clean surfaces within the impacted Work Area, including but not limited to, tools, equipment, and polyethylene sheeting to remove visible debris from the Work Area.

3. Tools and equipment utilized in the Work Area shall be thoroughly cleaned. Nonelectrical tools and equipment shall be cleaned monthly and before Removal from the Work Area by HEPA vacuuming and washing using a lead specific detergent or other suitable cleaning agent.

4. Electrical tools and equipment shall be HEPA vacuumed and cleaned by wet wiping limiting the amount of water used to avoid electrical hazards.

Page 753 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -21

5. Remove polyethylene sheeting, except for critical barriers, by folding it into itself beginning with the higher level polyethylene first.

6. Following Removal of polyethylene sheeting a final cleaning of surfaces in the Abatement workspace shall be performed by HEPA vacuuming, wet wiping, and a final HEPA vacuuming.

7. When HEPA vacuums are utilized, vacuuming shall be performed from the top down and from the area of impact to the outer edge of the polyethylene sheeting.

8. Apply no less than one continuous coat of approved paint or primer to abated surfaces, where applicable.

9. At the completion of the final clean up, the CDPHcertified supervisor shall inspect the Work Area for visible debris. If debris is identified, repeat the final cleaning process.

10. Wet wiping, washing, and cleaning required by this section shall include the Removal of visible debris by cleaning with a lead specific detergent or othersuitable cleaning agent in clean water followed by a rinsing with clean water and clean rags, following the same sequence of cleaning as the vacuuming.

11. Refer to the waste handling and transportation section of this Specification for disposal of waste generated by this process.

3.03 WASTE HANDLING AND TRANSPORTATION
A. Characterization of Waste:

1. Until analytical results are available, waste materials (including water containing paint chips) shall be treated as hazardous. Visible paint chips shall be separated from waste water before characterization. Following removal of solids the waste water shall be characterized to determine disposal requirements. The paint chips removed from the waste water may be disposed of as assumed RCRA hazardous waste or characterized to determine disposal requirements.

2. Characterize waste streams as follows:
a. Collect a representative sample of the waste material. b. For a pile of waste take one sample of a proportionate combination of Component in the pile. If a large quantity of waste is generated no less than four samples may be required.
c. For large wood Component, such as windows, doors, etcetera, a representative sample of each Component of similar characteristics, paint history, etcetera, shall be collected and tested. A full depth core sample, not less than one inch diameter, of the Component is to be collected. The core sample shall include the substrate and paint coatings on both sides of the Component, as applicable.

3. Analysis for the waste characterization samples shall be performed as follows:
a. Waste generated by chemical stripping shall, in addition to the requirements for determining the solid and soluble lead concentrations, shall be tested for

Page 754 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -22 corrosiveness and other contaminants, as applicable, resulting from the chemical stripping process.
b. Analyze samples for Total Threshold Limit Concentration (TTLC):
1) If results are less than 50 mg/kg (milligrams/kilogram) the waste is not hazardous and shall be disposed as general construction waste. 2) If sample results are 50 mg/kg or greater, the waste shall be tested for Soluble Threshold Limit Concentration (STLC).
c. Where waste is required to be tested for STLC the following shall apply:
1) If the STLC result is less than 5 mg/L (milligrams/liter) the material shall be disposed at a ClassII waste landfill. Evidence of such results of the STLC testing will be required by the landfill before waste is accepted. No further testing is required.
2) If the STLC results are 5 mg/L or greater, the waste is a California regulated waste and the material shall be tested using the federally mandated Toxicity Characterization Leaching Procedure (TCLP). d. Where waste is required to be tested by TCLP the following shall apply:
1) If the TCLP is less than 5 mg/L, the waste is a California regulated hazardous solid waste (non-RCRA). This material shall be disposed in a Class I hazardous waste landfill.
2) If the TCLP is equal to or greater than 5 mg/L, the waste is a federally regulated hazardous waste solid (RCRA). The waste shall then be disposed in a Class I hazardous waste landfill.
e. Personal and commercial wash water with lead contamination shall be handled as follows:
1) Filter the waste water through cheesecloth, or other similar filtering media, to remove the gross debris. Separate the waste streams and characterize these in compliance with this Specification. 2) If the waste water is identified as a RCRA or California regulated hazardous waste (Non-RCRA) by STLC and TCLP, filter the waste water by power pumping it through a 20 micron pore size filter. The filtered water shall be tested as described for waste in this Specification. 3) If test results categorize the filtered water as non-hazardous, it may be disposed of in the sewer system.
4) Wastewater, filtered or otherwise, shall not be discharged in storm drains, gutters or allowed to sheet flow over the surface of the ground.

B. Waste Handling:

1. Waste, hazardous and non-hazardous, shall be disposed of at an authorized site in accordance with provisions of this Specification and applicable Federal, State, and local laws.

Page 755 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -23

2. Any waste determined to be hazardous, through analytical testing, shall be kept in a secured area or lockable container that is inaccessible to persons other than authorized personnel working on the Project. Hazardous waste containers shall be labeled “Hazardous-Waste – Contains Lead” and labeled with the date waste collection commenced.

3. Hazardous waste shall not remain on the Project site beyond 90 days of the date it was generated. It shall be removed from the Project site and transported to an approved landfill before the 90 days has elapsed.

4. Waste shall not be transported from the work are to the storage container or waste hauler’s vehicle while students or staff are present in the path of travel. Where a path of travel cannot be cordoned off the transportation of waste must be completed prior to of after students and staff are not on site.

5. Once hazardous waste is removed from the Project site, ensure it is disposed of in an approved landfill within 6 days. The waste shall not be transported to another site for commingling of waste from a source other than the site of original generation. This requirement shall be documented by the proper execution of a Uniform Hazardous Waste Manifest signed by the landfill operator.

6. Hazardous and non-hazardous waste shall be kept in different containers and stored in separate locations. Commingling of waste is not permitted.

7. As the Work progresses, to prevent exceeding available storage capacity on the Project site, sealed and labeled containers of lead waste shall be removed and transported to the prearranged disposal location.

8. Containers used for hazardous waste shall meet the requirements of EPA and DOT for hazardous waste storage and transport. At a minimum, disposal packaging of Lead Based Paint fragments, dust, and debris shall be in 6-mil polyethylene (plastic) bags that are airtight and puncture resistant.

9. Any debris or residue observed on containers or surfaces outside of the Work Area resulting from clean up or disposal activities shall immediately be cleaned using HEPA filtered vacuum equipment and/or wet methods as appropriate.

10. Materials not contained in bags or other appropriate disposal containers shall not be placed in lead waste storage containers, nor shall storage containers be used for non-lead waste. To avoid damage, packaged waste shall be placed, not thrown, into the storage containers.

11. Lead Contaminated Soil shall be transported in plastic lined containers.

C. Transportation of Non-Hazardous Waste:

1. Receipts from the disposal facility, trip tickets, transportation manifests, weight certificates or other documentation of disposal shall be delivered to the Owner Consultant within 48 hours of disposal. The waste manifest shall be signed by the generator, the transporter(s), and the disposal site operator each time the responsibility for the waste material is transferred. If a separate hauler is employed, the name, address, and signature of the transporter shall also appear on the manifest.

D. Transportation of Hazardous Waste:

Page 756 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -24

1. Hazardous waste shall be transported by a RCRA/DOT/EPA certified hazardous waste transporter. Provide evidence that the hazardous waste transporter meets the requirements of this Specification.

2. The Work of this section includes responsibility for actions of the hazardous waste transporter as it pertains to waste Removal and disposal related to the Work of this Specification.

3. Identify the facility to which the waste generated by this Specification will be taken.

Evidence shall be provided verifying the facility is licensed/permitted to receive and handle non-hazardous lead containing waste and/or hazardous lead containing waste as applicable.

4. Waste disposed as hazardous shall be transported under a Uniform Hazardous Waste Manifest. The generator copy of this manifest shall be submitted to the Owner Consultant within five days of transport.

5. Dump receipts, trip tickets, transportation manifests, weight certificates or other documentation of disposal shall be delivered to the Owner Consultant within 48 hours of disposal. The Uniform Hazardous Waste Manifest shall be signed by the generator (or designee), the transporter(s), and the disposalsite operator each time the responsibility for the waste material is transferred. If a separate hauler is employed, the name, address, U.S.E.P.A. ID number and signature of the transporter shall also appear on the manifest.

6. The enclosed cargo area of trucks or containers shall be free of debris and lined with 6- mil polyethylene sheeting to prevent contamination from leaking or spilled containers.

Floor sheeting shall be installed first and extend up the walls. Wall sheeting shall be overlapped and taped into place.

7. During transport, drums and other containers shall be placed on level surfaces in the cargo area and packed tightly together to prevent shifting and tipping. Large structural Component shall be secured to prevent shifting and bags placed on top.

3.04 MONITORING
A. Project Management and Inspection:

1. Owner has the right to perform air, wipe, and visual monitoring at any time.

2. Owner shall proceed in accordance with the terms and conditions of the Contract Documents whenever the Work or protective measures are not in compliance with applicable governmental regulations, Contract requirements, and/or threatens the adjoining environment with lead contamination.

3. Where exposure monitoring indicates exposure is at or above the P.E.L. comply with Title 8, CCR Section 1532.1 (e) through (n).

B. Employee – Personal Air Monitoring:

1. Provide air monitoring as required by Title 8 CCR, Section 1532.1. Results shall be provided within ten working days of sampling. If the intent is to utilize such as exposure assessment documentation, and Work is to commence earlier than ten working days, submit results 24 hours in advance of the start of Work.

Page 757 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -25 C. Clearance Inspection:

1. Clearance Inspection for Lead Related Construction Work shall include:
a. A visual inspection of the Work Area by the Owner Consultant prior to occupancy for normal activity.
b. Do not remove barriers designating a regulated Work Area until a written release from the Owner Consultant is provided.
c. The Owner Consultant has the right to collect wipe samples as part of the Clearance Inspection.

2. Clearance Inspection for Abatement shall include:
a. A visual inspection of the Work Area by the Owner Consultant prior to collection of environmental samples (dust, wipe, and/or soil samples, as applicable).
b. Owner Consultant shall collect environmental samples. c. Results of samples shall comply with Title 17, CCR before the Work Area is released for normal occupancy.
d. Where samples fail to meet regulated clearance levels of Title 17, CCR, clean the Work Area as required for final cleaning in the Clean Up Procedures section of this Specification.
e. Following cleaning, the visual inspection and environmental sampling will be repeated as described above. This process shall continue until the clearance level of Title 17, CCR is provided.

3.05 RE-ESTABLISHMENT OF THE WORK AREA AND SYSTEMS
A. Re-establishment of the Work Area shall only occur following the completion of clean-up procedures and after a Clearance Inspection has been performed and documented to the satisfaction of the Owner Consultant.

B. Re-secure Moveable Objects removed from their former positions during area preparation activities.

C. Relocate Moveable Objects that were removed to temporary locations back to their original positions.

D. Reestablish HVAC, mechanical and electrical systems to the condition prior to commencement of the Project.

E. Repair areas of damage that occurred as a result of Abatement or Lead Related Construction Work.

3.06 PROJECT COMPLETION DOCUMENTATION
A. Provide to the Owner Consultant of the following close-out documentation:

Page 758 of 2548 ends

CIP 689 - Clark Building Renovations
LEAD ABATEMENT AND LEAD RELATED CONSTRUCTION WORK 028333 -26

1. Filter change logs for air filtration units, water filtration units and respirators

2. Foreman's daily job reports

3. Employee entry and exit logs for Work Areas

4. Visitor entry and exit logs for Work Area

5. Air sample results for personnel

6. Copies of hazardous and non-hazardous waste manifest

7. Hazardous waste weight tickets

8. Analytical data and chain of custody for waste characterization

9. Signed Daily Personnel Report Forms
B. Provide Owner Consultant with as-built drawings identifying surfaces where Lead Based Paint has been encapsulated or enclosed.

END OF SECTION

Page 759 of 2548 ends

CIP 689 - Clark Building Renovations
PROJECT NAME 06/17/2016

SCHOOL NAME LEAD ABATEMENT AND

LEAD RELATED CONSTRUCTION WORK
02 8333-27

Page 760 of 2548 ends

CIP 689 - Clark Building Renovations
CONCRETE FORMING AND ACCESSORIES 031000 -1
SECTION 03 1000 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Formwork for cast-in-place concrete as indicated.

2. Installation of items to be embedded in concrete, such as anchor bolts, inserts, embeds, and sleeves.

B. Related Requirements:

1. Division 01 - General Requirements.

2. Section 03 2000: Concrete Reinforcing.

3. Section 03 3000: Cast-In-Place Concrete.

1.02 REFERENCES
A. American Concrete Institute (ACI) Publication:

1. ACI 318 – Building Code Requirements for Structural Concrete, Chapter 6, Formwork, Embedded Pipes, and Construction Joints.

2. ACI 347 – Guide to Formwork for Concrete.

B. American Plywood Association (APA):

1. Form No. V345 - Concrete Forming Design/Construction Guide.

C. National Institute of Standards and Technology (NIST):

1. NIST Voluntary Product Standard PS 1.

1.03 SUBMITTALS
A. Submit detailed structural calculations and drawings approved and signed by a California registered Civil Engineer where the height of the falsework or vertical shoring, as measured from the top of the sills to the soffit of the superstructure exceeds 14 feet, or where individual horizontal span lengths exceed 16 feet, or where provision for vehicular traffic through falsework or shoring occurs. For all other falsework and shoring submit layout signed by California registered Civil Engineer, manufacturer’s authorized representative or a licensed contractor experienced in the usage and erection of falsework and vertical shoring. A copy of the plans and calculation shall be available at the jobsite at all times.

B. Shop Drawings: Submit Shop Drawings indicating locations of forms, construction and expansion joints, embedded items, and accessories.

Page 761 of 2548 ends

CIP 689 - Clark Building Renovations
CONCRETE FORMING AND ACCESSORIES 031000 -2
C. Product Data: Submit manufacturer's Product Data for form materials and accessories.

1.04 REGULATORY REQUIREMENTS
A. California Building Code (CBC), Chapter 19A.

B. California Code of Regulations, Title 8, Division 1, Chapter 4, Subchapter 4, Construction Safety Orders, Article 6, Excavations, Sections 1713 and 1717.

1.05 DELIVERY, STORAGE AND HANDLING
A. Storage shall prevent damage and permit access to materials for inspection and identification.

PART 2 - PRODUCTS

2.01 GENERAL
A. Form materials may be reused during progress of the Work provided they are completely cleaned and reconditioned, recoated for each use, capable of producing formwork of required quality, and are structurally sound.

B. Form Lumber: WCLIB Construction Grade or Better, WWPA No. 1 or Better.

C. Plywood: NIST Voluntary Product Standard PS 1, Group 1, Exterior Grade B-B Plyform or better, minimum 5-ply and 3/4 inch thick for exposed locations and at least 5/8 inch thick for unexposed locations, grade marked, not mill oiled. Furnished plywood with medium or high density overlay is permitted.

D. Coated Form Plywood: For exposed painted concrete, plastic overlaid plywood of grade specified above, factory coated with a form coating and release agent Nox-crete", or equal.

E. Tube Forms: Sonoco "Seamless Sonotubes,” Ceme-Tube, Quik-Tube, or equal, of the type leaving no marks in concrete, one-piece lengths for required heights.

F. Joist Forms: Code recognized steel or molded plastic types as required.

G. Special Forms: For exposed integrally-colored concrete, plywood as above with high density overlay, plywood with integral structural hardboard facing or fibrous glass reinforced plastic facing, providing specified finish.

H. For Exposed Concrete Finish:

1. Plywood: New, waterproof, synthetic resin bonded, exterior type Douglas fir or Southern pine plywood manufactured especially for concrete formwork and conforming to NIST Voluntary Product Standard PS 1, Grade B-B grade, Class I.

2. Glass-Fiber-Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to structural tolerances and appearance of finished concrete surfaces.

Page 762 of 2548 ends

CIP 689 - Clark Building Renovations
CONCRETE FORMING AND ACCESSORIES 031000 -3

3. Steel: Minimum 16 gage sheet, well matched, tight fitting, stiffened to support weight of concrete, without deflection detrimental to tolerances and appearances of finished concrete surfaces.

4. Plywood: "Finland Form”, "Combi Form" by North American Plywood Corporation, “Plyform” by Roy O. Martin, “ProForm” by Pacific Wood Laminates, or equal. The material shall be furnished with hard smooth birch face veneers with phenolic resin thermally fused onto panel sides. Edges shall be factory sealed.

I. Form Ties: Prefabricated rod, flat band, wire, internally threaded disconnecting type, not leaving metal within 1 1/2-inch of concrete surface.

J. Form Coating: Non-staining clear coating free from oil, silicone, wax, not grain-raising, "Formshield" by A.C. Horn, Inc., "Release" by Edoco/Dayton Superior, "Cast-Off" by Sonneborn/BASF Building Systems or equal. Where form liners are furnished, provide form coatings recommended by form liner manufacturer.

K. Form Liner: Rigid or resilient type by L.M. Scofield, Symons, Greenstreak, or equal.

L. Void Forms: Manufactured by SureVoid Products, Inc., Sonotube, Void Form International, or equal. Forms shall be "WallVoid" for temporary support of concrete walls and grade beams spanning between supports, and "SlabVoid" for creating gaps between concrete slabs or steps and underlying soils. Void forms shall be fabricated of corrugated paper with moisture resistant exterior, and shall be capable of withstanding working load of 1,500 psf. Provide accessories as required.

PART 3 - EXECUTION

3.01 GENERAL
A. Forms shall be constructed so as to shape final concrete structure conforming to shape, lines and dimensions of members required by Drawings and Specifications, and shall be sufficiently tight to prevent leakage of mortar. They shall be properly braced or tied together to maintain position and shape. Forms and their supports shall be designed so that previously placed structures will not be damaged.

B. Use form coating at all surfaces in contact with concrete.

3.02 TOLERANCES
A. Permitted abrupt or gradual irregularities in formed surfaces as measured within a 5 feet length with a straightedge shall per ACI 347, Table 3.1:

Class of Surface

A B C D
1/8 inch 1/4 inch 1/2 inch 1 inch

1. Class A: Use for concrete surfaces prominently exposed to public view.

Page 763 of 2548 ends

CIP 689 - Clark Building Renovations
CONCRETE FORMING AND ACCESSORIES 031000 -4

2. Class B: Use for coarse-textured concrete-formed surfaces intended to receive plaster, stucco or wainscoting.

3. Class C: Use as a general standard for permanently exposed surfaces where other finishes are not specified.

4. Class D: Use for surfaces where roughness is not objectionable and will be permanently concealed.

3.03 ERECTION
A. Plywood shall be installed with horizontal joints level, vertical joints plumb and with joints tight. Back joints by studs or solid blocking, and fill where necessary for smoothness. Reused plywood shall be thoroughly cleaned, damaged edges or surfaces repaired and both sides and edges oiled with colorless form oil. Nail plywood along edges, and to intermediate supports, with common wire nails spaced as necessary to maintain alignment and prevent warping.

B. Openings for Cleaning: Provide temporary openings at points in formwork to facilitate cleaning and inspection. At base of walls and wide piers, bottom form board on one face for entire length shall be omitted until form has been cleaned and inspected.

C. Chamfers: Provide 3/4 inch by 3/4 inch chamfer strips for all exposed concrete corners and edges unless otherwise indicated.

D. Reglets and Rebates: As specified in Section 03 3000: Cast-In-Place Concrete.

3.04 REMOVAL OF FORMS
A. Forms shall not be removed until concrete has sufficiently hydrated to maintain its integrity and not be damaged by form removal operations. Unless noted otherwise and/or permitted by the Architect, columns and wall forms shall not be removed in less than five days, floor slabs in less than seven days, beams and girders in less than 15 days, pan forms for joists may be removed after three days, but joist centering shall not be removed until after 15 days, and ramp, landing, steps and floor slabs shall not be removed in less than seven days. Shoring shall not be removed until member has acquired sufficient strength to support its weight, load upon it, and added load of construction.

B. Compressive strength of in-place concrete shall be determined by testing field-cured specimens representative of concrete location or members, as specified in Section 03 3000: Cast-In-Place Concrete.

3.05 PROTECTION
A. Protect the Work of this section until Substantial Completion.

3.06 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

END OF SECTION

Page 764 of 2548 ends

CIP 689 - Clark Building
CONCRETE REINFORCING 032000 -1
SECTION 03 2000 - CONCRETE REINFORCING
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Concrete steel reinforcement.

B. Related Requirements:

1. Division 01 - General Requirements.

2. Section 01 4523: Testing and Inspection.

3. Section 03 1000: Concrete Forming.

4. Section 03 3000: Cast-In-Place Concrete.

5. Section 04 2200: Concrete Unit Masonry.

1.02 REGULATORY REQUIREMENTS
A. Fabrication and placement of reinforcing shall be in accordance with requirements of CBC, Chapter 19A.

1.03 REFERENCES
A. ASTM International:

1. ASTM A184 - Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement.

2. ASTM A615 - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement.

3. ASTM A706 - Standard Specification for Deformed and Plain Low-Alloy Steel Bars for Concrete Reinforcement.

4. ASTM A1064 - Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.

B. American Concrete Institute (ACI) Publication:

1. ACI SP-66 – ACI Detailing Manual.

2. ACI 318 – Building Code Requirements for Structural Concrete, as modified by CBC.

C. American Welding Society (AWS):

Page 765 of 2548 ends

CIP 689 - Clark Building
CONCRETE REINFORCING 032000 -2

1. AWS D1.4 – Structural Welding Code – Reinforcing Steel.

1.04 SUBMITTALS
A. Shop Drawings: Submit steel reinforcement Shop Drawings. Include assembly diagrams, schedule of reinforcement, bending charts and slab and framing plans. Indicate lengths and location of splices, size and lengths of reinforcing steel.

B. Closeout Submittals: Record exact locations of reinforcing that vary from Contract Documents.

1.05 QUALITY ASSURANCE
A. Comply with the following as a minimum requirement:

1. Concrete Reinforcing Steel Institute (CRSI) Manual of Standard Practice.

2. American Welding Society (AWS).

3. American Concrete Institute (ACI).

4. CBC, Chapter 19A, Concrete.

B. Source Quality Control: Refer to Division 01 Sections for general requirements and to the following paragraphs for specific procedures. Testing laboratory retained by the OWNER shall select test Samples of bars, ties, and stirrups from the material at the Project Site or from the place of distribution, with each Sample consisting of not less than two 18 inch long pieces, and perform the following tests according to ASTM A615, or ASTM A706, as applicable:

1. Identified Bars: If Samples are obtained from bundles as delivered from the mill, identified as to heat number, accompanied by mill analyses and mill test reports, and properly tagged with the identification certificate so as to be readily identified, perform one tensile and one bend test for each 10 tons or fraction thereof of each size of bars.

Submit mill reports when Samples are selected.

2. Unidentified Bars: When positive identification of reinforcing bars cannot be performed and when random Samples are obtained; perform tests for each 2.5 tons or fraction thereof, one tensile and one bend test from each size of bars.

C. Certification of Welders: Shop and Project site welding shall be performed by welding operators certified by AWS.

1.06 DELIVERY, STORAGE AND HANDLING
A. Avoid exposure to dirt, moisture or conditions harmful to reinforcing.

B. Reinforcing steel bars, wire, and wire fabric shall be stored on the Project site to permit easy access for examination and identification of each shipment. Material of each shipment shall be separated for size and shape.

PART 2 - PRODUCTS

Page 766 of 2548 ends

CIP 689 - Clark Building
CONCRETE REINFORCING 032000 -3

2.01 GENERAL
A. Provide reinforcing of sizes, gages and lengths indicated, bent to indicated shapes.

2.02 MATERIALS
A. Steel Reinforcing Bars:

1. ASTM A615, deformed grade 60 or 75 billet steel, as indicated on the drawings.

2. Weldable reinforcing bars shall conform to ASTM A706.

B. Bars or Rod Mats: ASTM A184.

C. Welded Wire Fabric for Reinforcement: ASTM A1064.

D. Tie Wire: ASTM A1064, fully annealed, copper-bearing steel wire, 16 gage minimum.

E. Chairs, Spacers, Supports, and Other Accessories: Standard manufacture conforming to ACI 315 fabricated from steel wire of required types and sizes. For reinforcement supported from grade, provide properly sized dense precast blocks of concrete.

2.03 FABRICATION OF REINFORCING BARS
A. Comply with CRSI Manual of Standard Practice for Reinforced Concrete Construction for fabrication of reinforcing steel.

B. Bending and Forming: Fabricate bars of the indicated sizes and bend and form to required shapes and lengths by methods not injurious to materials. Do not heat reinforcement for bending. Bend bars No. 6 size and larger in the shop only. Bars with unscheduled kinks or bends are not permitted. Provide only tested and permitted bar materials.

C. Welding: Provide only ASTM A706 steel where welding is indicated. Perform welding by the direct electric arc process in accordance with AWS D1.4 and specified low-hydrogen electrodes.

Preheat 6 inches each side of joint. Protect joints from drafts during the cooling process; accelerated cooling is not permitted. Do not tack weld bars. Clean metal surfaces to be welded of loose scale and foreign material. Clean welds each time electrode is changed and chip burned edges before placing welds. When wire brushed, the completed welds must exhibit uniform section, smooth welded metal, feather edges without undercuts or overlays, freedom from porosity and clinkers, and good fusion and penetration into the base metal. Cut out welds or parts of welds deemed defective, using chisel, and replace with proper welding. Prequalification of welds shall be in accordance with CBC requirements.

PART 3 - EXECUTION

3.01 INSTALLATION
A. Bars shall be bent cold. Bars partially embedded in concrete shall not be field bent except as indicated on reviewed Shop Drawings.

B. Before installation and just prior to placing concrete, clean reinforcing of loose scale, rust, oil, dirt and any coating that could reduce bond.

Page 767 of 2548 ends

CIP 689 - Clark Building
CONCRETE REINFORCING 032000 -4
C. Accurately position, install, and secure reinforcing to prevent displacement during the placement of concrete.

D. Provide metal chairs to hold reinforcement the required distance above form bottoms. In beams and slab construction, provide chairs under top slab reinforcement as well as under bottom reinforcement. Space chairs so that reinforcement will not be displaced during installation.

Provide metal spacers to secure proper spacing. Stirrups shall be accurately and securely wired to bars at both top and bottom. At slabs, footings, and beams in contact with earth, provide concrete blocks to support reinforcement at required distance above grade.

E. Install and secure reinforcement to maintain required clearance between parallel bars and between bars and forms. Lapped splices shall be installed wherever possible in a manner to provide required clearance between sets of bars. Stagger lapped splices. Dowels and bars extending through construction joints shall be secured in position against displacement before concrete is installed and subsequently cleaned of concrete encrustations while they are still soft.

F. Do not install reinforcing in supported slabs and beams until walls and columns have been installed to underside of slabs and beams or until construction joints have been thoroughly cleaned. Reinforcing shall be inspected before placement of concrete and cleaned as required.

G. Use deformed bars unless otherwise indicated, except for spiral reinforcement.

3.02 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

3.03 PROTECTION
A. Protect the Work of this section until Substantial Completion.

END OF SECTION

Page 768 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -1
SECTION 03 3000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Cast-in-place normal weight and lightweight concrete, placement and finishing.

B. Related Requirements:

1. Division 01 - General Requirements.

2. Section 03 1000: Concrete Forming and Accessories.

3. Section 03 2000: Concrete Reinforcing.

4. Section 32 1313: Site Concrete Work.

1.02 REFERENCES
A. American Concrete Institute (ACI) Publication:

1. ACI 117 – Specifications for Tolerances for Concrete Construction and Materials.

2. ACI 301 – Specifications for Structural Concrete.

3. ACI 302.1R – Guide for Concrete Floor and Slab Construction.

4. ACI 305R - Specification for Hot Weather Concreting.

5. ACI 306.1 – Standard Specification for Cold Weather Concreting.

6. ACI 308R – Guide to External Curing of Concrete.

7. ACI 318 - Building Code Requirements for Structural Concrete, as modified by CBC Sections 1903A and 1905A.

B. American Society for Testing and Materials (ASTM) Standards:

1. ASTM C31 – Standard Specification for Making and Curing Concrete Test Specimensin the Field.

2. ASTM C33 - Standard Specification for Concrete Aggregates.

3. ASTM C39 - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

4. ASTM C42 - Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.

Page 769 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -2

5. ASTM C88 - Standard Test Method for Soundness of Aggregates by use of Sodium Sulphate or Magnesium Sulphate.

6. ASTM C94 - Standard Specification for Ready-Mixed Concrete.

7. ASTM C143 - Standard Test Method for Slump of Hydraulic Cement Concrete.

8. ASTM C150 - Standard Specification for Portland Cement.

9. ASTM C156 – Standard Test Method for Water Loss (from a Mortar Specimen) Through Liquid Membrane-Forming Curing Compounds for Concrete.

10. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete.

11. ASTM C172 – Standard Practice for Sampling Freshly Mixed Concrete.

12. ASTM C173 – Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method.

13. ASTM C260 – Standard Specification for Air-Entraining Admixtures for Concrete.

14. ASTM C289 - Standard Test Method for Potential Alkali-Silica Reactivity of Aggregates (Chemical Method).

15. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete.

16. ASTM C330 - Standard Specification for Lightweight Aggregates for Structural Concrete.

17. ASTM C494 - Standard Specification for Chemical Admixtures for Concrete.

18. ASTM C567 - Standard Test Method for Determining Density of Structural Lightweight Concrete.

19. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.

20. ASTM C845 - Standard Specification for Expansive Hydraulic Cement

21. ASTM C989 - Standard Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars.

22. ASTM C1107 - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink).

23. ASTM C1064 - Standard Test Method for Temperature of Freshly Mixed HydraulicCement Concrete.

24. ASTM C1240 - Standard Specification for Silica Fume Used in Cementitious Mixtures.

25. ASTM C1315 – Standard Specification for Liquid Membrane-Forming Compounds Having Special Properties for Curing and Sealing Concrete.

Page 770 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -3

26. ASTM D1308 – Standard Test Method for Effect of Household Chemicals on Clear and Pigmented Organic Finishes.

27. ASTM C1567 - Standard Test Method for Determining the Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method).

28. ASTM D1751 - Standard Test Method for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types).

29. ASTM D7234 – Standard Test Method for Pull-Off Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers.

30. ASTM E96 - Standard Test Methods for Water Vapor Transmission of Materials.

31. ASTM E1155 - Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers.

32. ASTM E1643 - Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill under Concrete Slabs.

33. ASTM E1745 - Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs.

34. ASTM F710 – Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring.

35. ASTM F1869 – Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.

36. ASTM F2170 – Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In Situ Probes.

37. ASTM F3010 – Standard Practice for Two-Component Resin Based MembraneForming Moisture Mitigation Systems for Use under Resilient Floor Coverings.

1.03 SUBMITTALS
A. Shop Drawings: Submit Shop Drawings indicating locations of cast-in-place concrete Work and accessory items such as vapor barriers. Include details and locations of reinforcing, embedded items, and interfacing with other Work.

B. Mix Design Data: Submit concrete mix designs asspecified herein and in Article 2.02.

1. Submit name, address and telephone number of the concrete production facility which the contractor intends to engage to design the concrete mixes. Submit name and qualifications of the proposed concrete technologist.

2. Mix Design: Submit a concrete mix design for each strength and type of concrete indicated in the drawings or specified. Include water/cement ratio, source, size and amount of coarse aggregate and admixtures. Predict minimum compressive strength,

Page 771 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -4
maximum slump and air content percentage. Clearly indicate locations where each mix design will be used.
a. Water/cement ration for concrete slabs on grade shall be 0.50 maximum.

3. Test Reports: Submit copies of test reports showing that the proposed mixes produce concrete with the strengths and properties specified. Include tests for cement, aggregates and admixtures. Provide gradation analysis.

C. Material Samples: Submit Samples illustrating concrete finishes and hardeners, minimum 12- inch by 12-inch.

D. Certificates: Submit certification that each of the following conformsto the standardsindicated:

1. Portland cement: ASTM C150.

2. Normal weight concrete aggregates: ASTM C33.

3. Lightweight concrete aggregates: ASTM C330.

4. Aggregates: Submit evidence that the aggregate is not reactive in the presence of cement alkalis. In the absence of evidence, aggregate shall be tested by one of the methods in ASTM C33 Appendix XI, Methods for Evaluating Potential for Deleterious Expansion Due to Alkali Reactivity of an Aggregate. Aggregates deemed to be deleterious or potentially deleterious may be used with the addition of a material that has been shown to prevent harmful expansion in accordance with Appendix XI of ASTM C33, when approved by the building official, in accordance to CBC Section 1903A5A.

5. Curing materials: ASTM C171.

E. Admixtures: Submit product data for proposed concrete admixtures.

1.04 QUALITY ASSURANCE
A. Continuous inspection shall be provided at the batch plant and for transit-mixed concrete to run check sieve analysis of aggregate, check moisture content of fine aggregate, check design of mix, check cement being used with test reports, check loading of mixer trucks, and certify to quantities of materials placed in each mixer truck.

B. Inspection shall be performed by a representative of a testing laboratory selected by the OWNER.

OWNER will pay for inspection costs. Notify the laboratory 24 hours in advance of time concrete is to be mixed. Notify the laboratory of postponement or cancellation of mixing within at least 24 hours of scheduling time.

C. CONTRACTOR shall assist the testing laboratory in obtaining and handling samples at the project site and at the source of materials.

D. Continuous batch plant inspection requirement may be waived in accordance with CBC Section 1705A.3.3.1. Waiver shall be in writing, including DSA approval. When batch plant inspection is waived by DSA, the following requirements shall be met:

1. Approved inspector of the testing laboratory shall check the first batching at the start of work and furnish mix proportions to the licensed weightmaster.

Page 772 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -5

2. Licensed weightmaster shall positively identify materials as to quantity and certify to each load by a ticket.

3. Tickets shall be transmitted to the Inspector by a truck driver with load identified thereon. The Inspector will not accept the load without a load ticket identifying the mix and will keep a daily record of placements, identifying each truck, its load and time of receipt and approximate location of deposit in the structure and will transmit a copy of the daily record to DSA.

4. At the end of the project, the weightmaster shall furnish an affidavit to DSA certifying that all concrete furnished conforms in every particular to proportions established by mix designs.

E. Special Inspections and Testsshall be in accordance with CBC Chapter 17A, Reinforcement and Anchor testing per CBC Section 1910A and Specification Section 01 4523.

1.05 DELIVERY, STORAGE AND HANDLING
A. Store cement and aggregate materials so as to prevent their deterioration or intrusion by foreign matter. Deteriorated or contaminated materials shall not be furnished.

B. Packaged materials shall bear the manufacturers and brand name label and shall be stored in their original unbroken package in a weather tight place until ready for use in the work.

1.06 PROJECT CONDITIONS
A. Cold Weather Requirements: Batching, mixing, delivering and placing of concrete in cold weather shall comply with the applicable requirements of ACI 306.1.

B. Hot Weather Requirements: Batching, mixing, delivering and placing of concrete in hot weather shall comply with the applicable requirements of ACI 305R.

C. Concrete temperature of freshly mixed concrete shall be determined per ASTM C1064.

PART 2 - PRODUCTS

2.01 MATERIALS
A. Cement: ASTM C150. Portland Cement.

B. Aggregates: Conform to the following standards:

1. Normal weight concrete: ASTM C33.

2. Lightweight concrete: ASTM C330, with fine aggregates per ASTM C33.

3. Aggregate shall be tested for Potential Alkali Reactivity of Cement-Aggregate Combinations per ASTM C289.

4. Nominal maximum size of coarse aggregate shall be no larger than:
a. 1/5 the narrowest dimension between sides of forms, nor

Page 773 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -6
b. 1/3 the depth ofslabs, nor
c. 3/4 the clear spacing between individual reinforcing bars or wires, bundles of bars, individual tendons, or ducts.

C. Water: Water for concrete mixes, curing and cleaning shall be potable and free from deleterious matter.

D. Admixtures: Shall be shown capable of maintaining essentially the same composition and performance throughout the work as the product used in establishing concrete proportions in accordance with ACI 318, Section 3.6.

1. Admixtures containing chlorides or sulfides are not permitted.

2. Air-entraining admixtures shall comply with ASTM C260. Air-entrained admixtures shall not be used for floor slabs to receive steel trowel finish.

3. Admixtures for water reduction and setting time modification shall conform to ASTM C494.

4. Admixtures for producing flowing concrete shall conform to ASTM C1017.

5. Fly ash, pozzolan and ground granulated blast-furnace slag: Modify ACI 318 Sections

3.6.6 and 3.6.7 as follows:
a. Fly ash or other pozzolan used as a partial substitution for ASTM C150 Portland cement shall meet the following requirements:
1) Shall conform to ASTM C618 for Class N or F materials (Class C is not permitted).
b. Ground-granulated blast-furnace slag used as a partial substitution for ASTM C150 Portland cement shall meet the following requirements:
1) Shall conform to ASTM C989.

6. Admixtures containing ASTM C845 expansive cements shall be compatible with the cement and produce no deleterious effects.

7. Silica fumes used as an admixture shall conform to ASTM C1240.

E. Reinforcement Fibers: Chop strands of alkali-resistant polypropylene or nylon fibers added to the concrete mix for protection against shrinkage cracks.

F. Expansion Joint Fillers: Preformed strips, non-extruding and resilient bituminous type, of thickness indicated, conforming to ASTM D1751.

G. Curing:

1. Curing Paper: Shall conform to ASTM C171 and consist of two sheets of kraft paper cemented together with a bituminous material in which are embedded cords or strands of fiber running in both directions. The paper shall be light in color, shall be free of visible defects, with uniform appearance.

Page 774 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -7

2. Elevated slabs and slabs on grade may be cured at CONTRACTOR’s option with curing and proactive water vapor emission and alkalinity control system. Products shall be approved by OWNER’s Office of Environmental Health and Safety. a. VaporSeal 309, by Floor Seal Technology, Inc., or equal. 1) ASTM C156: 0.39 kg/m².
2) ASTM C309: Exceeds requirements.
3) ASTM C1315: Exceedsrequirements.
4) ACI 308R-01 Compliant.
b. Remedial Treatment: Water vapor emission and alkalinity control treatment, MES 100 by Floor Seal Technology, Inc. or equal.
1) ASTM E96: <0.1 Perms.
2) ASTM D1308: 14pH Resistant.
3) ASTM D7234: 500+psi 100% concrete failure.
4) ASTM F2170: 100%RH resistant.
5) VOC Content: <100 g/L, meets SCAQMD Rule #1113.
6) ASTM F3010: Meets Requirements.
c. Self-leveling Compounds: Ardex Engineered Cements, K15, or V1200, Schonox ZM Rapid, US Self Leveler Armstrong, S-194, or equal.

H. Floor Hardener: Water soluble, inorganic, silicate-based curing, hardening, sealing and dustproofing compound. Aquaseal W20 by Monopole Inc., Kure-N-Harden by BASF, Chem Hard by L&M, Liqui-Hard by W. R. Meadows, or equal.

I. Underlayment: Two component latex underlayment for filling low spots in concrete for both interior and exterior applications, from featheredge to a maximum of 3/8 inch in thickness.

Underlayment shall be non-shrink and suitable for repairing exposed concrete surfaces and for underlayment of carpet, resilient, tile and quarry floor coverings. La-O-Tex by TexRite, Underlay C, RS by Mer-Krete Systems, Underlayment 962 by C-Cure, or equal.

J. Vapor Barrier: Treads and Nosings: Two part stair tread and nosing with ribbed abrasive bars.

Fabricated from 6063-T5 or 6063-T6 extruded aluminum, mill finish. Anti-slip abrasive filler consisting of aluminum oxide, silicon carbide, or a combination of both, in an epoxy-resin binder.

Color shall extend uniformly throughout filler.

1. American Safety Tread: TP-311R.

2. Balco Inc.: DST-330.

3. Nystrom: STTB-P3.375E.

4. Wooster Products Inc.: WP-RN3SG.

Page 775 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -8

5. Equal.

K. Grout: ASTM C1107, non-shrink type, pre-mixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing additives, capable of developing a minimum compressive strength of 7,000 psi at 7 days; of consistency suitable for application and a 30 minute working time.

2.02 CONCRETE MIX
A. Mix shall be signed and sealed by a Civil or Structural Engineer currently registered in the State of California.

B. Strength of Concrete: Strengths and types of concretes shall be as indicated in the Drawings.

Unless otherwise indicated or specified, concrete shall be provided with minimum 28-day strength of 3000 psi (f'c).

C. Concrete mix shall meet the durability requirements of ACI 318, Chapter 4.

D. Concrete proportioning shall be determined on the basis of field experience and/or trial mixtures shall in accordance with ACI 318, Section 5.3. Proportions of materials shall provide workability and consistency to permit concrete to be placed readily into forms and around reinforcement under conditions of placement to be employed, without segregation or excessive bleeding.

E. Ready-Mixed Concrete: Mix and deliver in accordance with requirements of ASTM C94.

PART 3 - EXECUTION

3.01 GENERAL
A. Surfaces to receive concrete shall be free of debris, standing water, and any other deleterious substances before start of concrete placing.

B. Time of Placing: Do not place concrete until reinforcement, conduits, outlet boxes, anchors, hangers, sleeves, bolts, and other embedded materials are securely fastened in place. Contact the Inspector at least 24 hours before placing concrete; do not place concrete until inspected by the Project Inspector.

C. Pouring Record: A record shall be kept on the Project site of time and date of placing concrete in each portion of structure. Such record shall be maintained on the Project site until Substantial Completion and shall be available for examination by the ARCHITECT and DSA.

3.02 TOLERANCES
A. Concrete construction tolerances shall be as specified in ACI 117 and as modified herein.

B. Floor Flatness (FF) and Floor Levelness (FL) shall be as indicated below:

Page 776 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -9
Specified Overall Value Minimum Local Value

FF FL FF FL
Slabs on ground: mechanical
and electrical rooms, parking
structures and mortar bed set
tile and quarry flooring.
20 15 15 10
Slab on ground: carpet. 25 20 17 15
Slab on ground: thinset tile
and resilient flooring.
35 25 24 17
Suspended slabs: mechanical
and electrical rooms, parking
structures and mortar bed set
tile and quarry flooring.
20 15 N/A N/A
Suspended slabs: carpet. 25 20 N/A N/A
Suspended slabs: thinset tile
and resilient flooring.
35 20 N/A N/A
C. Refer to ACI 302.1R, Tables 8.1 and 8.2 Slab on Ground and Suspended Flatness/Levelness Construction Guide, for recommended concrete placing and finishing methods.

D. Floor Flatness and Floor Levelness shall be tested in accordance to ASTM E1155. Floor measurements shall be made within 48 hours after slab installation, and shall precede removal of shores and forms.

3.03 PREPARATION
A. Reglets and Rebates:

1. Form reglets and rebates in concrete to receive flashing, frames and other equipment as detailed and required. Coordinate dimensions and locations required with other related Work.

2. If concrete slabs on grade adjoin a wall or other perpendicular concrete surface, form a reglet in wall to receive and carry horizontal concrete Work. Reglet shall be full thickness of the slab and shall be 3/4 inch wide, unless otherwise indicated. Requirement does not apply to exterior walks, unless specifically indicated.

B. Screeds: Install screeds accurately and maintain at required grade or slab elevations after steel reinforcement has been installed, but before starting to place concrete. Install screeds adjacent to walls and in parallel rows not to exceed 8 feet on centers.

3.04 INSTALLATION
A. Conveying and Placing:

1. Concrete shall be placed only under direct observation of the Project Inspector. Do not place concrete outside of regular working hours, unless the Inspector has been notified at least 48 hours in advance.

Page 777 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -10

2. Concrete shall be conveyed from mixer to location of final placement by methods that will prevent separation or loss of materials.

3. Concrete shall be placed as nearly as practicable to itsfinal position to avoid segregation due to re-handling or flowing. No concrete that has partially hydrated or has been contaminated by foreign materials shall be placed, nor shall re-tempered concrete or concrete which has been remixed after initial set be placed.

4. In placing concrete in columns, walls or thin sections, provide openings in forms, elephant trunks, tremies or other recognized devices, to prevent segregation and accumulation of partially hydrated concrete on forms or metal reinforcement above level of concrete being placed. Such devices shall be installed so that concrete will be dropped vertically. Unconfined vertical drop of concrete from end of such devices to final placement surface shall not exceed 6 feet.

5. Concrete shall be placed as a continuous operation until placing of panel or section is completed. Top surfaces of vertically formed lifts shall be level.

6. Concrete shall be thoroughly consolidated by suitable means during placement and shall be thoroughly worked around reinforcement and embedded fixtures and into corners of forms.

7. Where conditions make consolidation difficult or where reinforcement is congested, batches of mortar containing same proportions of cement, sand, and water as provided in the concrete, shall first be deposited in the forms to a depth of at least one inch.

B. Cold Weather:

1. Provide adequate equipment for heating concrete materials and protecting concrete during freezing or near-freezing weather. All ground with which concrete is to come in contact shall be free from frost. No frozen materials or materials containing ice shall be used.

2. The temperature of concrete at the time of placement shall not be below the minimum temperatures given in Table 3.1 of ACI 306.1.

3. Concrete shall be maintained at a temperature of at least 50° F. for not less than 72 hours after placing or until it has thoroughly hardened. Cover concrete and provide sufficient heat as required. When necessary, aggregates shall be heated before mixing. Special precautions shall be taken for protection of transit-mixed concrete.

C. Hot Weather:

1. Concrete to be placed during hot weather shall comply with the requirements of ACI 318, Section 5.13.

2. Maintain concrete temperatures indicated in Table 2.1.5 of ACI 305R to prevent the evaporation rate from exceeding 0.2 pound of water per square feet of exposed concrete per hour.

3. Cool concrete using methods indicated in ACI 305R Appendix B.

4. Place and cure concrete as specified in ACI 305R Chapter 4.

Page 778 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -11
D. Compaction and Screeding:

1. Tamp freshly placed concrete with a heavy tamper until at least 3/8 inch of mortar is brought to surface. Concrete shall then be tamped with a light tamper and screeded with a heavy straightedge until depressions and irregularities are eliminated, and surface istrue to finish grades or elevations. Remove excess water and debris.

2. Where slabs are to receive separate cement finish or mortar setting bed, continued tamping to raise mortar to surface is not performed. Laitance shall be removed by brushing with a stiff brush or by light sandblasting to expose clean top surface of coarse aggregate.

E. Floating and Troweling:

1. When concrete has hydrated sufficiently, it shall be floated to a compact and smooth surface. After floating, wait until concrete has reached proper consistency before troweling. Top surfaces shall receive at least 2 troweling operations with steel hand trowel. Prior to and during final troweling, apply a fine mist of water frequently with an atomizing type fog sprayer. Omit troweling forslabsto receive a separate cement finish.

2. For interior finish slabs, final troweling shall provide a hard, impervious, and non-slip surfaces, free from defects and blemishes. Finished surface shall be within tolerances indicated in Article 3.02. Avoid burnishing. Do not add cement or sand to absorb excess moisture.
a. Floor of Walk-In Refrigerator: Finish asspecified above, to a smooth finish. b. Floor of Gymnasium Locker Rooms: After floating, and while the surface is still plastic, provide a fine textured finish by drawing a fine fiber bristle broom uniformly over the surface in one direction only. Floors sloped for drainage should be brushed in the direction of flow.

3. Vertical concrete surfaces shall be finished smooth and free from marks or other surface defects.

3.05 CURING
A. Length of time, temperature and moisture conditions for curing concrete shall be in accordance with ACI 318, Section 5.11.

B. Forms containing concrete, top of concrete between forms, and exposed concrete surfaces after removal of forms shall be maintained in a thoroughly wet condition for at least 7 consecutive days after placing.

C. If weather is hot or surface has dried out, spray surface of concrete slabs and paving with fine mist of water, starting not later than 2 hours after final troweling and continuing until sunset.

Surface of finish shall be kept continuously wet until curing medium has been installed.

D. Immediately after finishing, monolithic floor slabs shall be covered with curing paper. Paper shall be lapped 4 inches at joints and sealed with waterproof sealer. Edges shall be cemented to finish. Repair or replace paper damaged during construction operations.

E. When curing slabs with proactive water vapor emission and alkalinity control system:

Page 779 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -12

1. Coordinate and schedule application of curing compound with concrete pour schedule, while conforming to manufacturer’s application instructions.

2. When the surface of the concrete has hardened sufficiently to sustain foot traffic pre-cure slabs with liquefied product application following manufacturer’s written instructions.

Application shall be by trained applicators.

3. Monitor Environmental Conditions: Set up weather station 20 to 30 inches above freshly placed concrete. Record temperature, humidity and wind velocity measurements at 15 minute maximum intervals.

4. Calculate Evaporation Rate: Use recorded weather information in combination with nomograph per ACI 308R, Figure 4.1, Guide to Curing Concrete, to evaluate relevant evaporation rate.

5. When the bleed water rate of the concrete is approximately equal to the surface water evaporation rate, spray curing compound material throughout surface of slabs and decks, following manufacturer’s written instructions. Application shall be by trained applicators.

6. Perform the following tests at least 28 days after placement of concrete and prior to floor covering installation. Submit to OAR test resultsindicating locationsthat do not comply with scheduled flooring installation requirements.
a. Calcium chloride testing per ASTM F1869.
b. Relative humidity testing per ASTM F2170.
c. Alkalinity testing per ASTM F710.
d. Perform concrete bond layer humidity meter testing to determine substrate surface acceptability.

7. Areas emitting moisture and alkalinity at rates exceeding floor covering manufacturer’s published ASTM F1869 limits, shall receive a corrective coating, at no cost to the OWNER, as follows:
a) Mask and protect adjacent walls and floor surfaces from effects of scarification and application of remedial treatment.
b) Scarify slab surface in area of application by shot blasting or other method acceptable to corrective coating manufacturer.
c) Prepare and fill cracks, control joints and cold joints. d) Apply two-component modified epoxy penetrant and coating with roller and squeegee over required treatment area; saturate surfaces to ensure a through mechanical bond.
e) Clean and fill divots, chips, voids and other surface irregularities with one hundred percent Portland cement based patching compound or cementitious fill. f) Apply cementitious surfacing over coating in areas to receive resilient and wood floor coverings to facilitate adhesion; apply to a thickness of 1/8 inch.

Page 780 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -13

3.06 FILLING, LEVELING AND PATCHING
A. Concrete slabs exhibiting high or low spots and indicated to receive resilient floor covering or soft floor covering, shall have surfaces repaired. High spots shall be honed, or ground with power-driven machines to required tolerances. Low spots shall be filled with latex underlayment, installed in strict accordance with manufacturer's written recommendations.

B. Holes resulting from form ties or sleeve nuts shall be solidly packed, through exterior walls, by pressure grouting with cement grout, as specified. Grouted holes on exposed surfaces shall be screeded flush and finished to match adjoining surfaces.

C. Cement Base: Cement base shall be of the height, thickness, and shape detailed. Base shall be reinforced with one inch mesh, 18 gage, zinc-coated wire fabric. Base finish mixture shall be one part Portland cement, 2 parts of fine aggregate and one part pea gravel. Colored cement base shall include a chemically inert mineral oxide pigment in the mix.

3.07 FINISHING
A. Soda and Acid Wash: Concrete surfaces to receive plaster, paint or other finish, and which have been formed by oil coated forms, shall be scrubbed with a solution of 1-1/2 pounds of caustic soda to one gallon of water. Surfaces where smooth wood or waste molds have been furnished shall be scrubbed with a solution of 20 percent muriatic acid. Wash with clean water after scrubbing.

B. Sacking: Exposed concrete curbs, walls, and other surfaces shall be sacked by an application of Portland cement grout, floated, and rubbed. Sacking shall not be performed until patching and filling of holes has been completed. Entire sacking operation for any continuous area shall be started and completed within the same day.

1. Mix one part Portland cement and 1-1/2 parts fine sand with sufficient water to produce a grout having consistency of thick paint. Wet surface of concrete sufficiently to prevent absorption of water from grout. Apply grout uniformly with a brush or spray gun, then immediately floatsurface with a cork or othersuitable float, scouring wall vigorously.

2. While grout is still plastic, finish surface with a sponge-rubber float, removing excess grout. Allow surface to dry thoroughly, then rub vigorously with dry burlap to completely remove dried grout. No visible film or grout shall remain after rubbing with burlap.

C. Sandblasting: Exterior concrete surfaces to receive stucco dash coat finish, where plywood or other smooth forms have been furnished, shall be uniformly sand-blasted with sharp quartz sand under sufficient air pressure to remove dirt, form oil and other foreign materials, and roughen surface to provide a proper bond. Such surfaces shall be thoroughly washed with clean water after sandblasting.

D. Abrasive: Concrete stair treads, landings, ramps and steps on interior and exterior of buildings, and interior exposed concrete floorsin shop buildings shall receive an abrasive finish.

E. Floor Hardener: Exposed interior concrete floors throughout shall be treated with floor hardener.

1. Protect adjacent surfaces. Clean surfaces to receive treatment in accordance with manufacturer's instructions, ensuring that all stains, oil, grease, form release agents, laitance, dust and dirt are removed prior to application.

Page 781 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -14

2. Apply hardener in accordance with manufacturer’s instructions as soon as concrete is firm enough to work on after final troweling.

F. Cement Grout and Dry-Pack Concrete: Cement grout shall be mixed at the Project site and shall be composed of one volume of Portland cement and 2-1/2 volumes of fine aggregate. Materials shall be mixed dry with sufficient water added to make mixture flow under its own weight. When grout is used as a dry pack concrete, add sufficient water to provide a stiff mixture, which can be molded into a sphere.

G. Broom Finish: Exterior stair treads and landings shall be provided with a non-slip broom finish in addition to abrasive finish specified.

H. Abrasive Stair Nosing: Nosing shall be installed according to manufacturers written recommendations.

3.08 EXPANSION AND CONSTRUCTION JOINTS
A. Construction Joints: Details and proposed location of construction joints shall be asindicated on the Drawings, located to least impairstrength ofstructure, in accordance with the following:

1. Thoroughly clean contact surface by sand blasting entire surface not earlier than 5 days after initial placement.

2. A mix containing same proportion of sand and cement provided in concrete plus a maximum of 50 percent of coarse aggregate shall be placed to a depth of at least one inch on horizontal joints. Vertical joints shall be wetted and coated with a neat cement grout immediately before placing of new concrete.

3. Should contact surface become coated with earth, sawdust, or deleterious material of any kind after being cleaned, entire surface shall be re-cleaned before applying mix.

B. Expansion Joints: Provide expansion joints where indicated in walks and exterior slabs. Space approximately 20 feet apart, unless otherwise indicated. Joints shall extend entirely through slab with joint filler in one piece for width of walk or slab. Joint filler shall be 3/8 inch thick, unless otherwise indicated.

C. Tooled Joints: Slabs, walks and paving shall be marked into areas as indicated with markings made with a V-grooving tool. Marks shall be round-edged, free from burrs or obstructions, with clean cut angles and shall be straight and true. Walks, if not indicated, shall be marked off into rectangles of not more than 12 square feet and shall have a center marking where more than 5 feet wide.

3.09 TESTING
A. Molded Cylinder Tests:

1. Inspector or testing lab personnel will prepare cylinders and perform slump tests.

Samples for concrete strength shall be taken in accordance to ASTM C172. Each cylinder shall be dated, given a number, point in structure from which sample was obtained, mix design number, mix design strength and result of accompanying slump test noted.

Page 782 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -15

2. Separate tests of molded concrete cylinders obtained at same place and time shall be made at age of three days, seven days, and 28 days. A strength test shall be the average of the compressive strength of two cylinders, obtained from the same sample of concrete and tested at 28 days or at test age designated for determination of f'c.

3. Test cylinders shall be prepared at the Project site and stored in testing laboratory in accordance with ASTM C31, and tested in accordance with ASTM C39.

B. Core Test: At request of the ARCHITECT, cores of hardened concrete shall be cut from portions of hydrated structures for testing, in accordance with CBC and ASTM C42.

1. Provide 4 inch diameter cores at representative places throughout the structure as designated by the ARCHITECT.

2. In general, provide sufficient cores to represent concrete placed with at least one core for each 4,000 square feet of building area, and at least 3 cores total for each Project.

3. Where cores have been removed, fill voids with drypack, and patch the finish to match the adjacent existing surfaces.

C. Concrete Consistency: Measure consistency according to ASTM C143. Test twice each day or partial day's run of the mixer.

D. Adjustment of Mix: If the strength of any grade of concrete for any portion of Work, asindicated by molded test cylinders, falls below minimum 28 days compressive strength specified or indicated, adjust mix design for remaining portion of construction so that resulting concrete meets minimum strength requirements.

E. Air Content Testing: Measure in accordance to ASTM C173 or ASTM C231, for each composite sample taken in accordance to ASTM C172.

F. Defective Concrete:

1. Should strength of any grade of concrete, for any portion of Work indicated by tests of molded cylinders and core tests, fall below minimum 28 days strength specified or indicated, concrete will be deemed defective Work and shall be replaced or adequately strengthened in a manner acceptable to the ARCHITECT and DSA.

2. Concrete Work that is not formed as indicated, is not true within 1/250 of span, not true to intended alignment, not plumb or level where so intended, not true to intended grades and levels, contains sawdust shavings, wood or embedded debris, or does not fully conform to Contract provisions, shall be deemed to be defective Work and shall be removed and replaced.

G. Concrete for Equipment Pads, Mechanical and Electrical Work: Unless otherwise indicated, strength shall have a minimum f
’
c = 3,000 psi. Exposed concrete shall be provided with a hand trowel finish with radius corners and edges. Form and place concrete where necessary as described in Section 03 1000 Concrete Forming and Accessories, and reinforced as described in Section 03 2000 Concrete Reinforcing. Calcium chloride shall not be furnished in any concrete mix provided for the installation of underground electrical conduits. For concrete encasement of more than one conduit, furnish 3/4 inch maximum aggregate.

3.10 CLEAN UP

Page 783 of 2548 ends

CIP 689 - Clark Building Renovations
CAST-IN-PLACE CONCRETE 033000 -16
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

3.11 PROTECTION
A. Protect the Work of this section until Substantial Completion.

END OF SECTION

Page 784 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -1
055000 – METAL FABRICATIONS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Steel framing and supports for countertops.

2. Steel framing and supports for applications where framing and supports are not specified in other Sections.

3. Miscellaneousframing supports.

4. Miscellaneoussteel trim.

5. Abrasive metal nosings.

6. Trash enclosure gates.

1.3 DEFINITIONS
A. Exterior: Defined as the following:

1. Areas, locations, and surfaces that are unprotected, or exposed to environmental elements.

2. Areas, locations and surfaces within uncontrolled environments.

3. Areas, locations and surfaces of unconditioned spaces, including below grade/underground, partially-exposed, or “covered” parking areas.

1.4 PERFORMANCE REQUIREMENTS
A. Structural Performance of Ladders: Provide ladders capable of withstanding the effects of loads and stresses within limits and under conditions specified in ANSI A14.3.

B. Thermal Movements: Provide exterior metal fabrications that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, materialsurfaces.

1.5 SUBMITTALS
A. Product Data: For items specified.

Page 785 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -2

1.6 QUALITY ASSURANCE
A. Welding: Qualify procedures and personnel according to the following:

1. AWS D1.1, "Structural Welding Code--Steel."

1.7 COORDINATION
A. Coordinate installation of anchorages for metal fabrications. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

B. Coordinate installation of steel weld plates and angles for casting into concrete that are specified in this Section but required for work of another Section. Deliver such items to Project site in time for installation.

1.8 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal fabrications that failsin materials or workmanship within specified warranty period.

1. Warranty Period: 1 year.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Extruded Abrasive Metal Nosings: Subject to compliance with requirements, provide either the product by named manufacturer or an equal product by one of the other manufacturers specified.

1. Type 24 by American Safety Tread Co., Inc. (Basis of Design)

2. Type 24 Spectra by Wooster Products Inc.

3. Or equal.

2.2 METALS, GENERAL
A. Metal Surfaces, General: Provide materials with smooth, flat surfaces, unless otherwise indicated.

For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes.

2.3 FERROUS METALS
A. Steel Plates, Shapes, and Bars: ASTM A 36.

B. Stainless-Steel Sheet, Strip, Plate, and Flat Bars: ASTM A 666, Type 304.

Page 786 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -3
C. Stainless-Steel Bars and Shapes: ASTM A 276, Type 304.

D. Steel Tubing: ASTM A 500, cold-formed steel tubing.

E. Steel Pipe: ASTM A 53, standard weight (Schedule 40), unless another weight is indicated or required by structural loads.

2.4 FASTENERS
A. General: Unless otherwise indicated, provide Type 304 stainless-steel fasteners for exterior use and zinc-plated fasteners with coating complying with ASTM B 633, Class Fe/Zn 5, at exterior walls. Provide stainless-steel fasteners for fastening aluminum. Select fasteners for type, grade, and class required.

B. Anchor Bolts: ASTM F 1554, Grade 36.

1. Provide hot-dip or mechanically deposited, zinc-coated anchor bolts where item being fastened is indicated to be galvanized.

2.5 MISCELLANEOUS MATERIALS
A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.

B. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79.

1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer.

C. Galvanizing Repair Paint: High-zinc-dust-content paint for regalvanizing welds in steel, complying with SSPC-Paint 20.

D. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.

E. Nonshrink, Metallic Grout: Factory-packaged, ferrous-aggregate grout complying with ASTM C 1107, specifically recommended by manufacturer for heavy-duty loading applications.

F. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior and exterior applications.

2.6 FABRICATION, GENERAL
A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.

B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch, unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

Page 787 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -4
C. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work.

D. Form exposed work true to line and level with accurate angles and surfaces and straight edges.

E. Weld corners and seams continuously to comply with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.

F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) screws or bolts, unless otherwise indicated. Locate joints where least conspicuous.

G. Fabricate seams and other connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.

H. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items.

I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads.

1. Where units are indicated to be cast into concrete or built into masonry, equip with integrally welded steel strap anchors, 1/8 by 1-1/2 inches, with a minimum 6-inch embedment and 2-inch hook, not less than 8 inches from ends and corners of units and 24 inches o.c., unless otherwise indicated.

2.7 MISCELLANEOUS FRAMING AND SUPPORTS
A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work.

B. Fabricate units from steel shapes, plates, and bars of welded construction, unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction retained by framing and supports. Cut, drill, and tap units to receive hardware, hangers, and similar items.

C. Fabricate supports for operable partitions from continuous steel beams of sizes indicated with attached bearing plates, anchors, and braces as indicated. Drill bottom flanges of beams to receive partition track hanger rods; locate holes where indicated on operable partition Shop Drawings.

D. Galvanize miscellaneous framing and supports where indicated.

E. Prime miscellaneous framing and supports with zinc-rich primer where indicated.

Page 788 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -5

2.8 STEEL WELD PLATES AND ANGLES
A. Provide steel weld plates and angles not specified in other Sections, for items supported from concrete construction as needed to complete the Work. Provide each unit with not less than two integrally welded steel strap anchors for embedding in concrete.

2.9 MISCELLANEOUS STEEL TRIM
A. Unless otherwise indicated, fabricate units from steel shapes, plates, and bars of profiles shown with continuously welded joints and smooth exposed edges. Miter corners and use concealed field splices where possible.

B. Provide cutouts, fittings, and anchorages as needed to coordinate assembly and installation with other work.

C. Galvanize exterior miscellaneous steel trim and interior miscellaneous steel trim, where indicated.

2.10 ABRASIVE METAL NOSINGS
A. Extruded Units: Aluminum, with abrasive filler consisting of aluminum oxide, silicon carbide, or a combination of both, in an epoxy-resin binder. Fabricate units in sizes and configurations indicated and in lengths necessary to accurately fit openings or conditions.

1. Provide anti-slip strip of contrasting color 2 inches wide, parallel to and not more than 1 inch from the front nose of each step.

B. Provide anchors for embedding units in concrete, either integral or applied to units, as standard with manufacturer.

C. Drill for mechanical anchors and countersink. Locate not more than 4 inches from ends and not more than 12 inches o.c., evenly spaced between ends, unless otherwise indicated. Provide closer spacing if recommended by manufacturer.

1. Provide 2 rows of holes for units more than 5 inches wide, with 2 holes aligned at ends and intermediate holes staggered.

D. Apply bituminous paint to concealed bottoms, sides, and edges of cast-metal units set into concrete.

E. Apply clear lacquer to concealed bottoms, sides, and edges of extruded units set into concrete.

2.11 TRASH ENCLOSURE GATES
A. Gate Configuration, Frame Height, and Opening Width: As indicated on Drawings.

B. Framing: Fabricated steel tubes, angles, and plates as detailed on Drawings, hot-dipped galvanized finish after fabrication, with galvanized corrugated steel panel infill.

C. Gate Hardware:

Page 789 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -6

1. As indicated on Drawings, welded-on heavy weight butt hinges, minimum 3-hinges per gate leaf, hot-dipped galvanized finish.

2. Cane Bolts: Provide for inactive leaf of pairs of gates. Fabricated from 3/4-inch- diameter, round steel bars, hot-dip galvanized after fabrication. Finish to match gates. Provide galvanized-steel pipe strikes to receive cane bolts in both open and closed positions.

D. Finish: Field finish per Division 9 Section “Painting”.

1. Color: As indicated on Drawings.

2.12 FINISHES, GENERAL
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

B. Finish metal fabrications after assembly.

2.13 STEEL AND IRON FINISHES
A. Galvanizing: Hot-dip galvanize items as indicated to comply with applicable standard listed below:

1. ASTM A 123, for galvanizing steel and iron products.

2. ASTM A 153, for galvanizing steel and iron hardware.

B. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with minimum requirements indicated below for SSPC surface preparation specifications and environmental exposure conditions of installed metal fabrications:

1. Exteriors (SSPC Zone 1B) and Items Indicated to Receive Zinc-Rich Primer: SSPCSP 6/NACE No. 3, "Commercial Blast Cleaning."

2. Interiors (SSPC Zone 1A): SSPC-SP 3, "Power Tool Cleaning." C. Shop Priming: Apply shop primer to uncoated surfaces of metal fabrications, except those with galvanized finishes and those to be embedded in concrete, sprayed-on fireproofing, or masonry, unless otherwise indicated. Comply with SSPC-PA 1, "Paint Application Specification No. 1:

Shop, Field, and Maintenance Painting of Steel," for shop painting.

1. Stripe paint corners, crevices, bolts, welds, and sharp edges.

D. Field Finish: Comply with Division 9 Section “Painting” for field painting.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL
A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels.

Page 790 of 2548 ends

CIP 689 - Clark Building Renovations
METAL FABRICATIONS 055000 -7
B. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after fabrication and are for bolted or screwed field connections.

C. Field Welding: Comply with the following requirements:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.

D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag bolts, wood screws, and other connectors.

E. Provide temporary bracing or anchors in formwork for items that are to be built into concrete, masonry, or similar construction.

3.2 INSTALLING MISCELLANEOUS FRAMING AND SUPPORTS
A. General: Install framing and supports to comply with requirements of items being supported, including manufacturers' written instructions and requirements indicated on Shop Drawings.

B. Anchor supports for operable partitions securely to and rigidly brace from building structure.

3.3 ADJUSTING AND CLEANING
A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas. Paint uncoated and abraded areas with the same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.

1. Apply by brush or spray to provide a minimum 2.0-mil dry film thickness.

B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780.

END OF SECTION 055000

Page 791 of 2548 ends

CIP 689 - Clark Building Renovations
ALUMINUM LADDERS 055134 - 1
SECTION 055134 - ALUMINUM LADDERS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Attic access ladders.

1.3 SUBMITTALS
A. Product Data: Manufacturer's data sheets on each product.

B. Shop Drawings:

1. Detail fabrication and erection of each ladder indicated. Include plans, elevations,sections, and details of metal fabrications and their connections.

2. Provide templates for anchors and bolts specified for installation under other Sections.

3. Provide reaction loads for each hanger and bracket.

C. Qualification Data: Refer to Quality Assurance provisions for submittal requirements evidencing experience, certifications and resources.

D. Verification Samples: For each finish specified, two samples, minimum size 6 inches square, represent actual product color.

1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: A firm experienced in producing aluminum metal ladderssimilar to those indicated for this Project.

B. Record of successful in-service performance.

C. Sufficient production capacity to produce required units.

D. Installer Qualifications: Competent and experienced firm capable of selecting fasteners and installing ladders to attain designed operational and structural performance.

1.5 WARRANTY

Page 792 of 2548 ends

CIP 689 - Clark Building Renovations
ALUMINUM LADDERS 055134 - 2
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of aluminum ladders that failsin materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Structural failures.
b. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Aluminum Ladders: Subject to compliance with requirements, provide either the named product or an equal product by one of the other manufacturers specified.

1. Precision Ladders LLC. (Basis of Design)

2. O’Keeffe’s Inc.

3. Royalite.

4. Alaco.

5. Or equal.

2.2 MATERIALS
A. Aluminum Fixed Vertical Ladder and Components: Ladder, cage, rest platforms, floormounting brackets, security doors, walk-thru, and side rails.

1. Capacity: Unit shall support a 1500 lb loading without failure, and individual treads shall withstand a 3,000 lb loading without failure.

2. Performance Standard: Units designed and manufactured to meet or exceed ANSI A14.3 and OSHA 1910.27.

2.3 ATTIC ACCESS LADDERS
A. Product: Super Simplex Disappearing Stairway by Precision Ladders or equal.

1. Meetsrequirements of A.N.S.I. A14.9-2010 for “Commercial” or “Residential” use.

2. Test Weight of 500 lbs.

3. Individual tread test weights of 1000 lbs.

4. Actual shear of rivets tested to 1175 lbs.

5. Steel frame.

6. Extruded aluminum treads & side rails.

7. 5 3/16" x 18" (std) clear tread area.

8. Clear tread width varies depending on frame width (22 1/2” min - 39” max).

9. Access door panel.

2.4 ALUMINUM FINISHES

Page 793 of 2548 ends

CIP 689 - Clark Building Renovations
ALUMINUM LADDERS 055134 - 3
A. Mill finish. As extruded.

PART 3 - EXECUTION

3.1 INSTALLATION
A. Install in accordance with manufacturer'sinstructions.

B. Anchor securely using fasteners specified by manufacturer or others of equivalent or greater strength and corrosion resistance.

END OF SECTION 055134

Page 794 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 1
SECTION 055213 - PIPE AND TUBE RAILINGS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Steel pipe and tube railings.

B. Related Sections:

1. Division 9 Section “Painting” for field painting.

1.3 DEFINITIONS
A. Exterior: Defined as the following:

1. Areas, locations, and surfaces that are unprotected, or exposed to environmental elements.

2. Areas, locations and surfaces within uncontrolled environments.

3. Areas, locations and surfaces of unconditioned spaces, including belowgrade/underground, partially-exposed, or “covered” parking areas.

1.4 PERFORMANCE REQUIREMENTS
A. Structural Performance: Provide railings capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:

1. Handrails:
a. Uniform load of 50 lbf/ ft. applied in any direction. b. Concentrated load of 200 lbf applied in any direction. c. Uniform and concentrated loads need not be assumed to act concurrently.

2. Top Rails of Guards:
a. Uniform load of 50 lbf/ ft. applied in any direction. b. Concentrated load of 200 lbf applied in any direction. c. Uniform and concentrated loads need not be assumed to act concurrently.

3. Infill of Guards:
a. Uniform load of 25 lbf/sq. ft. applied horizontally. b. Infill load and other loads need not be assumed to act concurrently.

B. Thermal Movements: Provide exterior railings that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

Page 795 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 2

1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, materialsurfaces.

C. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.

1.5 SUBMITTALS
A. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

1. For installed products indicated to comply with design loads, include structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.6 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of railing through one source from a singlemanufacturer.

B. Welding: Qualify procedures and personnel according to the following:

1. AWS D1.1, "Structural Welding Code--Steel."
C. Appearance: Galvanized articles shall be free from uncoated areas, blisters, flux deposits, acid and black spots, and dross inclusions. Lumps, projections, globules, or heavy deposits of zinc which will interfere with the intended use of the material will not be permitted.

1.7 COORDINATION AND SCHEDULING
A. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

B. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy structural performance requirements.

1.8 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agreesto repair or replace components of pipe and tube railings that fails in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Structural failures.
b. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

Page 796 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 3
PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Steel Pipe and Tube Railings:

1. Wagner/Braun.

2. Local iron fabricators.

B. Nonshrink, Nonmetallic Grout:

1. 1107 Advantage Grout by Dayton Superior Chemical & Cement Products.

2. Conset Grout by ChemMasters Specialty Construction Products.

3. General-Purpose Grout by Symons.

4. Or equal.

2.2 METALS, GENERAL
A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.

B. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails, unless otherwise indicated.

2.3 STEEL AND IRON
A. Tubing: ASTM A 500 (cold formed) or ASTM A 513, Type 5 (mandrel drawn).

B. Pipe: ASTM A 53, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads.

1. Provide galvanized finish for exterior installations and where indicated.

2.4 FASTENERS
A. General: Provide the following:

1. Steel Railings: Plated steel fasteners complying with ASTM B 633, Class Fe/Zn 25 for electrodeposited zinc coating.

B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated.

1. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless exposed fasteners are unavoidable or are the standard fastening method for railings indicated.

C. Anchors: Provide cast-in-place anchors, fabricated from corrosion-resistant materials with capability to sustain, without failure, a load equal to six times the load imposed when installed in unit masonry and equal to four times the load imposed when installed in concrete, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency.

Page 797 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 4

2.5 MISCELLANEOUS MATERIALS
A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.

B. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior and exterior applications.

2.6 FABRICATION
A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage.

B. Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly.

Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces.

C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch, unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

D. Form work true to line and level with accurate angles and surfaces.

E. Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.

F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similaritems.

G. Connections: Fabricate railings with welded connections, unless otherwise indicated.

H. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings.

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove flux immediately.

4. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces.

I. Form changes in direction as detailed.

J. Form simple and compound curves by bending members in jigs to produce uniform curvature for each repetitive configuration required; maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components.

K. Close exposed ends of railing members with prefabricated end fittings.

L. Provide wall returns at ends of wall-mounted handrails, unless otherwise indicated. Close ends of returns unless clearance between end of rail and wall is 1/4 inch or less.

Page 798 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 5
M. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work, unless otherwise indicated.

1. At brackets and fittings fastened to plaster or gypsum board partitions, provide fillers made from crush-resistant material, or other means to transfer wall loads through wall finishes to structural supports and prevent bracket or fitting rotation and crushing ofsubstrate.

N. Provide inserts and other anchorage devices for connecting railings to concrete or masonry work.

Fabricate anchorage devices capable of withstanding loads imposed by railings. Coordinate anchorage devices with supporting structure.

O. For railing posts set in concrete, provide steel sleeves not less than 6 inches long with inside dimensions not less than 1/2 inch greater than outside dimensions of post, with steel plate forming bottom closure.

2.7 FINISHES, GENERAL
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

2.8 STEEL AND IRON FINISHES
A. Galvanized Railings:

1. Hot-dip galvanize exterior steel and iron railings, including hardware, after fabrication.

2. Comply with ASTM A 123 for hot-dip galvanized railings.

3. Comply with ASTM A 153 for hot-dip galvanized hardware.

B. Fill vent and drain holes that will be exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth.

C. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and other ferrous components.

D. For nongalvanized steel railings, provide nongalvanized ferrous-metal fittings, brackets, fasteners, and sleeves, except galvanize anchors to be embedded in exterior concrete or masonry.

E. Preparation for Shop Priming: After galvanizing, thoroughly clean railings of grease, dirt, oil, flux, and other foreign matter, and treat with metallic-phosphate process.

F. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with minimum requirements indicated below for SSPC surface preparation specifications and environmental exposure conditions of installed railings:

1. Exterior Railings (SSPC Zone 1B): SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning."

2. Interior Railings (SSPC Zone 1A): SSPC-SP 7/NACE No. 4, "Brush-off Blast Cleaning." G. Apply shop primer to prepared surfaces of railings, unless otherwise indicated. Comply with requirements in SSPC-PA 1, "Paint Application Specification No. 1: Shop, Field, and Maintenance Painting of Steel," for shop painting. Primer need not be applied to surfaces to be embedded in concrete or masonry.

Page 799 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 6

1. Do not apply primer to galvanized surfaces.

2. Stripe paint corners, crevices, bolts, welds, and sharp edges.

H. Field Finish: Comply with Division 9 Section “Painting” for field painting.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine plaster and gypsum board assemblies, where reinforced to receive anchors, to verify that locations of concealed reinforcements have been clearly marked for Installer. Locate reinforcements and mark locations if not already done.

3.2 INSTALLATION, GENERAL
A. Fit exposed connections together to form tight, hairline joints.

B. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free ofrack.

1. Do not weld, cut, or abrade surfaces of railing componentsthat have been coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.

2. Set posts plumb within a tolerance of 1/16 inch in 3 feet.

3. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet.

C. Adjust railings before anchoring to ensure matching alignment at abutting joints.

D. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction.

3.3 RAILING CONNECTIONS
A. Welded Connections: Use fully welded joints for permanently connecting railing components.

Comply with requirements for welded connections in Part 2 "Fabrication" Article whether welding is performed in the shop or in the field.

3.4 ANCHORING POSTS
A. Use steel pipe sleeves preset and anchored into concrete for installing posts. After posts have been inserted into sleeves, fill annular space between post and sleeve with nonshrink, nonmetallic grout or anchoring cement, mixed and placed to comply with anchoring material manufacturer's written instructions.

B. Leave anchorage joint exposed; wipe off surplus anchoring material; and leave 1/8-inchbuildup, sloped away from post.

Page 800 of 2548 ends

CIP 689 - Clark Building Renovations
PIPE AND TUBE RAILINGS 055213 - 7
C. Anchor posts to metal surfaces with oval flanges, angle type, or floor type as required by conditions, connected to posts and to metal supporting members as follows:

1. For steel pipe railings, weld flanges to post and bolt to metal supporting surfaces.

3.5 ADJUSTING AND CLEANING
A. Clean aluminum and stainless steel by washing thoroughly with clean water and soap and rinsing with clean water.

B. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.

C. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780.

3.6 PROTECTION
A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.

B. Restore finishes damaged during installation and construction period so no evidence remains of correction work. Return items that cannot be refinished in the field to the shop; make required alterations and refinish entire unit, or provide new units.

END OF SECTION 055213

Page 801 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 1
SECTION 064023 - INTERIOR ARCHITECTURAL WOODWORK
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Plastic-laminate cabinets.

2. Plastic-laminate countertops.

3. Solid-surfacing-material countertops.

4. Stone countertops.

1.3 DEFINITIONS
A. Interior architectural woodwork includes wood furring, blocking, shims, and hanging strips for installing woodwork items unless concealed within other construction before woodwork installation.

1.4 SUBMITTALS
A. Product Data: For each type of product indicated.

B. Shop Drawings: Show location of each item, dimensioned plans and elevations, large-scale details, attachment devices, and other components.

1. Show locations and sizes of furring, blocking, and hanging strips, including concealed blocking and reinforcement specified in other Sections.

2. Show locations and sizes of cutouts and holes for plumbing fixtures and other items installed in architectural woodwork.

3. Apply WI-certified compliance label to first page of Shop Drawings and follow Section 1, “Guidelines for Architectural Millwork Shop Drawing”.

C. Samples for Initial Selection: For each type of product indicated requiring product selection.

D. Samples for Verification:

1. Plastic laminates, 8 by 10 inches, for each type, color, pattern, and surface finish, with 1 sample applied to core material and specified edge material applied to 1 edge.

2. Solid-surfacing materials, 6 inches square.

3. Corner pieces as follows:
a. Cabinet-front frame joints between stiles and rails, as well as exposed end pieces, 18 inches high by 18 inches wide by 6 inches deep.
b. Miter joints for standing trim.

Page 802 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 2

4. Exposed cabinet hardware and accessories, one unit for each type and finish. a. Hardware samples will be returned up on approval.

E. Product Certificates: For each type of product, signed by product manufacturer.

F. Woodwork Quality Standard Compliance Certificates for Product and Installation: WI-certified compliance certificates confirming conformance with Certified Compliance Program (CCP).

G. Qualification Data: For Installer and fabricator.

1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: Shop that employs skilled workers who custom-fabricate products similar to those required for this Project and whose products have a record of successful inservice performance. Shop is a licensee of WI's Certified Compliance Program.

B. Installer Qualifications: Licensee of WI's Certified Compliance Program.

C. Quality Standard: Unless otherwise indicated, comply with WI's "Manual of Millwork" for grades of interior architectural woodwork indicated for construction, finishes, installation, and other requirements.

1. Before delivery to job-site, Millwork supplier:
a. Licensees of WI shall issue a certified compliance certificate indicating millwork products being furnished for this project, and certifying that these products and their installation, will fully meet requirements of grade or gradesspecified. b. Non-Licensees of WI shall provide evidence that they have arranged for inspection by WI inspector after completion of fabrication and installation. If conditions are found to be compliant, inspector will issue Compliance Certificate indicating millwork products being furnished for this project, and certifying that these products and their installation, will fully meet requirements of grade or grades specified.

2. Each elevation of casework and each countertop shall bear certified compliance label.

3. Cabinet Design Series (CDS): CDS numbers on Drawings indicate typical designs.

D. Fire-Test-Response Characteristics: Where fire-retardant materials or products are indicated, provide materials and products with specified fire-test-response characteristics as determined by testing identical products per test method indicated by UL, ITS, or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify with appropriate markings of applicable testing and inspecting agency in the form of separable paper label or, where required by authorities having jurisdiction, imprint on surfaces of materials that will be concealed from view after installation.

E. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination."

1.6 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver woodwork until painting and similar operationsthat could damage woodwork have been completed in installation areas. If woodwork must be stored in other than installation

Page 803 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 3
areas, store only in areas where environmental conditions comply with requirements specified in "Project Conditions" Article.

1.7 PROJECT CONDITIONS
A. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet work is complete, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period.

B. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet work is complete, and HVAC system is operating and maintaining temperature between 60 and 90 deg F and relative humidity between 25 and 55 percent during the remainder of the construction period.

C. Field Measurements: Where woodwork is indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication, and indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

1. Locate concealed framing, blocking, and reinforcements that support woodwork by field measurements before being enclosed, and indicate measurements on Shop Drawings.

2. Established Dimensions: Where field measurements cannot be made without delaying the Work, establish dimensions and proceed with fabricating woodwork without field measurements. Provide allowance for trimming at site, and coordinate construction to ensure that actual dimensions correspond to established dimensions.

1.8 COORDINATION
A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units of Work specified in other Sections to ensure that interior architectural woodwork can be supported and installed as indicated.

1.9 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agreesto repair or replace components of interior architectural woodwork that fails in materials or workmanship within specified warranty period.

1. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. High-Pressure Decorative Laminate: Subject to compliance with requirements, provide highpressure decorative laminates by one of the following:

1. Formica Corporation. (Basis of Design)

Page 804 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 4

2. Nevamar Company, LLC; Decorative Products Div.

3. Wilsonart International; Div. of Premark International, Inc.

4. Or equal.

B. Solid Surfacing Materials: Subject to compliance with requirements, provide products by one of the following:

1. Caesarstone. (Basis of Design)

2. Corian.

3. LG- Quartz.

4. Avonite.

5. Hi Macs.

6. Or equal.

C. Medium-Density Fiberboard: ANSI A208.2, Grade MD, made with binder containing no urea formaldehyde.

1. Medex, Medex NC, Medite II, or Arreis SDF by SierraPine Ltd.

2. Weyerhaeuser Company; Premier Plus by Weyerhaeuser.

3. Or equal.

D. Particleboard: ANSI A208.1, Grade made with binder containing no urea formaldehyde.

1. Rodman Industries, Inc.

2. Acadia Board Company.

3. PrimeBoard, Inc.

4. Or equal.

E. Cabinet hardware: Subject to compliance with requirements, provide products by one of the following manufacturers.

1. Hafele. (Basis of Design)

2. Accuride.

3. Or equal.

2.2 MATERIALS
A. General: Provide materials that comply with requirements of WI's quality standard for each type of woodwork and quality grade specified, unless otherwise indicated.

B. Core and Substrates: Comply with the following:

1. Hardboard: AHA A135.4.

2. Medium-Density Fiberboard: ANSI A208.2, GradeMD.

3. Particleboard: ANSI A208.1, Grade M-2-ExteriorGlue.

C. Thermoset Decorative Panels: Particleboard or medium-density fiberboard finished with thermally fused, melamine-impregnated decorative paper complying with LMA SAT-1.

1. Provide PVC or polyester edge banding complying with LMA EDG-1 on components with exposed or semiexposed edges.

D. High-Pressure Decorative Laminate (HPDL): NEMA LD 3, grades as indicated or, if not indicated, as required by woodwork quality standard.

Page 805 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 5
E. Solid-Surfacing Material: Homogeneous solid sheets of filled plastic resin complying with ISSFA-2.

1. Type: Standard type, unless Special Purpose type isindicated.

2.3 CABINET HARDWARE AND ACCESSORIES
A. General: Provide the following unless indicated otherwise on Drawings.

B. Adjustable Shelf Supports: Standard side-mounted system using multiple holes for pin supports and coordinated self rests, polished chrome finish, for nominal 1 inch spacing adjustments.

1. Product: KV #255 by Knape & Vogt or equal.

C. Grommets: Plastic, 2 inch diameter, locations as indicated. If locations are not indicated, as selected by Architect during shop drawing review. Doug Mockett, Sugatsune, Wood Technology, or equal.

D. Drawer and Door Pulls: For all, including accessible casework.

1. Pull and knobs as indicated on Drawings.

E. Cabinet Locks: Keyed cylinder, two keys per lock, master keyed, steel with chrome finish to key with door hardware. All doors and drawers to be lockable.

F. Hinges: Concealed (fully mortised) self-closing type, BHMA No. 652, steel with polished finish.

1. Products: Blum or equal.

G. Drawer Slides: BHMA A156.9, B05091.

1. Heavy Duty (Grade 1HD-200): Side mounted; full-extension type; zinc-plated steel ballbearing slides. Model 3640 by Accuride or equal.

2.4 MISCELLANEOUS MATERIALS
A. Furring, Blocking, Shims, and Hanging Strips: Softwood or hardwood lumber, kiln dried to less than 15 percent moisture content.

B. Anchors: Select material, type, size, and finish required for each substrate for secure anchorage.

Provide nonferrous-metal or hot-dip galvanized anchors and inserts on inside face of exterior walls and elsewhere as required for corrosion resistance. Provide toothed-steel or lead expansion sleeves for drilled-in-place anchors.

C. Adhesives, General: Do not use adhesives that contain urea formaldehyde.

D. VOC Limits for Installation Adhesives and Glues: Use installation adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):

1. Wood Glues: 30 g/L.

2. Contact Adhesive: 250 g/L.

E. Adhesive for Bonding Plastic Laminate: Unpigmented contact cement.

1. Adhesive for Bonding Edges: Hot-melt adhesive or adhesive specified above for faces.

Page 806 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 6

2.5 FABRICATION, GENERAL
A. Interior Woodwork Grade: Unless otherwise indicated, provide Custom-grade interior woodwork complying with referenced quality standard.

B. Wood Moisture Content: Comply with requirements of referenced quality standard for wood moisture content in relation to ambient relative humidity during fabrication and in installation areas.

C. Fabricate woodwork to dimensions, profiles, and details indicated. Ease edges to radius indicated for the following:

1. Corners of Cabinets and Edges of Solid-Wood (Lumber) Members 3/4 Inch Thick or Less: 1/16 inch.

2. Corners of Cabinets and Edges of Solid-Wood (Lumber) Members and Rails: 1/16 inch.

D. Complete fabrication, including assembly, finishing, and hardware application, to maximum extent possible before shipment to Project site. Disassemble components only as necessary for shipment and installation. Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting.

1. Notify Architect 7 days in advance of the dates and times woodwork fabrication will be complete.

2. Trial fit assemblies at fabrication shop that cannot be shipped completely assembled. Install dowels, screws, bolted connectors, and other fastening devices that can be removed after trial fitting. Verify that various parts fit as intended and check measurements of assemblies against field measurements indicated on Shop Drawings before disassembling for shipment.

E. Shop-cut openings to maximum extent possible to receive hardware, appliances, plumbing fixtures, electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagrams to produce accurately sized and shaped openings. Sand edges of cutouts to remove splinters and burrs.

1. Seal edges of openings in countertops with a coat of varnish.

2.6 PLASTIC-LAMINATE CABINETS
A. WI Construction Style: Style A, Frameless.

B. WI Construction Type: Type I, multiple self-supporting units rigidly joined together.

C. WI Door and Drawer Front Style: Flush Reveal overlay.

D. Laminate Cladding for Exposed Surfaces: High-pressure decorative laminate complying with the following requirements:

1. Both sides of all shelves shall be 0.028 high pressure decorative laminate, regardless of location or exposure, and shall not span more than 34 inches.

2. Shelves shall be retained with seismic clips.

3. Cabinets shall be designed for full use of corners.

4. Upper cabinets shall be at 4’-6” AFF max.

E. Semi-Exposed Surfaces: Any of one of following.

Page 807 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 7

1. Low pressure decorative polyester overlay.

2. Low pressure decorative melamine overlay.

3. HPL cabinet liner.

4. Solid Phenolic core (SPC).

5. Vinyl at cabinet backs and drawer bottoms only.

F. Concealed Surfaces: Any of one of following.

1. Solid Wood or Plywood: Any hardwood or softwood species, with no defects affecting strength or utility. Hardwood and softwood lumber kiln dried to 7 and 10 percent moisture content, respectively.

2. Particleboard: ANSI A208.1, Grade M-2.

3. Medium-Density Fiberboard: ANSI A208.2.

4. Solid Phenolic core (SPC).

G. Colors, Patterns, and Finishes: Provide materials and products that result in colors and textures of exposed laminate surfaces complying with the following requirements:

1. As indicated on Drawings.

2.7 PLASTIC-LAMINATE COUNTERTOPS
A. High-Pressure Decorative Laminate Grade: HGS, 0.048 inches (1.2 mm) thick.

B. Provide Exterior grade plywood at wet locations and comply with following:

1. No seams shall occur within 18 inches of sink cut-outs.

2. Sink cut-outs shall be coated with opaque sealer.

3. Back splash shall coordinate with size of soap and paper tower dispensers for solid attachment.

4. Corners of tops shall be cut at 45 degrees if projecting or in pathway.

C. Colors, Patterns, and Finishes: Provide materials and products that result in colors and textures of exposed laminate surfaces complying with the following requirements:

1. As indicated on Drawings.

D. Edge Treatment: Self-edge banded.

E. Laminate Substrates: Medium-density fiber board (MDF). Do not use plywood.

F. Backer Sheet: Provide plastic-laminate backer sheet, Grade BKL, on underside of countertop substrate.

2.8 SOLID-SURFACING-MATERIAL COUNTERTOPS
A. Solid-Surfacing-Material Thickness: 1/2 inch.

B. Colors, Patterns, and Finishes: Provide materials and products that result in colors of solidsurfacing material indicated on Drawings.

C. Fabricate tops in one piece, unless otherwise indicated. Comply with solid-surfacing-material manufacturer's written recommendations for adhesives, sealers, fabrication, and finishing.

Page 808 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 8
D. Drill holes in countertops for plumbing fittings and soap dispensers in shop.

2.9 STONE COUNTERTOPS
A. As indicated on Drawings.

PART 3 - EXECUTION

3.1 PREPARATION
A. Before installation, condition woodwork to average prevailing humidity conditions in installation areas.

B. Before installing architectural woodwork, examine shop-fabricated work for completion and complete work as required, including removal of packing and backpriming.

3.2 INSTALLATION
A. Grade: Install woodwork to comply with requirements for the same grade specified in Part 2 for fabrication of type of woodwork involved.

B. Assemble woodwork and complete fabrication at Project site to comply with requirements for fabrication in Part 2, to extent that it was not completed in the shop.

C. Install woodwork level, plumb, true, and straight. Shim as required with concealed shims. Install level and plumb (including tops) to a tolerance of 1/8 inch in 96 inches.

D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair damaged finish at cuts.

E. Anchor woodwork to anchors or blocking built in or directly attached to substrates. Secure with countersunk, concealed fasteners and blind nailing as required for complete installation. Use fine finishing nails or finishing screws for exposed fastening, countersunk and filled flush with woodwork and matching final finish if transparent finish is indicated.

F. Cabinets: Install without distortion so doors and drawers fit openings properly and are accurately aligned. Adjust hardware to center doors and drawers in openings and to provide unencumbered operation. Complete installation of hardware and accessory items asindicated.

1. Install cabinets with no more than 1/8 inch in 96-inch sag, bow, or other variation from a straight line.

2. Maintain veneer sequence matching of cabinets with transparent finish.

3. Fasten wall cabinets through back, near top and bottom, at ends and not more than 16 inches o.c. with No. 10 wafer-head sheet metal screws through metal backing or metal framing behind wall finish.

G. Countertops: Anchor securely by screwing through corner blocks of base cabinets or other supports into underside of countertop.

Page 809 of 2548 ends

CIP 689 - Clark Building Renovations
INTERIOR ARCHITECTURAL WOODWORK 064023 - 9

1. Align adjacent solid-surfacing-material countertops and form seams to comply with manufacturer's written recommendations using adhesive in color to match countertop.

Carefully dress joints smooth, remove surface scratches, and clean entire surface.

2. Install countertops with no more than 1/8 inch in 96-inch sag, bow, or other variation from a straight line.

3. Secure backsplashes to tops with concealed metal brackets at 16 inches o.c. and to walls with adhesive.

4. Calk space between backsplash and wall with sealant specified in Division 7 Section "Joint Sealants."
H. Touch up finishing work specified in this Section after installation of woodwork. Fill nail holes with matching filler where exposed.

I. Refer to Division 9 Sections for final finishing of installed architectural woodwork not indicated to be shop finished.

3.3 ADJUSTING AND CLEANING
A. Repair damaged and defective woodwork, where possible, to eliminate functional and visual defects; where not possible to repair, replace woodwork. Adjust joinery for uniform appearance.

B. Clean, lubricate, and adjust hardware.

C. Clean woodwork on exposed and semiexposed surfaces. Touch up shop-applied finishes to restore damaged or soiled areas.

END OF SECTION 064023

Page 810 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -1
SECTION 06 1000 - ROUGH CARPENTRY
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Rough carpentry Work.

2. Installation of glued laminated members, plywood web joists or wood chord metal web joists.

B. Related Requirements:

1. Division 01 - General Requirements.

2. Section 03 1000: Concrete Forming and Accessories.

3. Section 03 3000: Cast-In-Place Concrete.

4. Section 06 2000: Finish Carpentry.

5. Section 09 2900: Gypsum Board.

1.02 SYSTEM DESCRIPTION
A. Regulatory Requirements:

1. Work of this Section shall comply with CBC Chapter 23.

1.03 QUALITY ASSURANCE
A. Comply with the following as a minimum requirement:

1. Redwood structural and framing lumber shall be graded in accordance with Standard Specifications for Grades of California Redwood Lumber of the Redwood Inspection Service.

2. Douglas fir, larch or hemlock structural and framing lumber shall be graded in accordance with the Standard Grading Rules of the West Coast Lumber Inspection Bureau (WCLIB) or the Western Lumber Grading Rules of the Western Wood Products Association (WWPA).

3. Plywood shall conform to requirements of Product Standard PS 1, and shall be grade marked by a recognized grading agency (APA and PTL).

B. Lumber shall bear official grade mark of the association under whose rules it was graded or official grade mark of another recognized grading agency.

Page 811 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -2
C. Structural and framing members 2-inch thick (nominal) and larger shall be air-dried to moisture content not to exceed 19 percent before installation.

D. Each piece of preservative treated lumber shall be identified by the Quality Mark of an approved inspection agency in accordance with CBC Chapter 23; refer to Section 01 4523: Testing and Inspection.

E. Lumber showing visible signs of mold growth:

1. Lumber showing visible signs of mold growth shall be removed from the project site or cleaned as outlined below.

2. The contractor is responsible for all costs associated with cleaning, post-cleaning testing, and reporting for lumber with mold.
a. Lumber that shows visible signs of mold growth prior to, or after installation, shall be cleaned pursuant to the current edition of USEPA’s guidance publication “Mold Remediation in Schools and Commercial Buildings (EPA 402-K-01-001).
b. A minimum of 10 percent of the total locations cleaned must be sampled (tape lift method) post cleaning to ensure cleaning effort was successful. Cleaning will be considered acceptable when tape lift sample results evaluated by direct microscopic examination determine that the general abundance of mold is nondetect or rare (normal trapping to 1+). c. A report prepared by a Certified Industrial Hygienist (CIH) that details the sampling and cleaning results shall be prepared and submitted to the OAR for review and approval of the LAUSD Office of Environmental Health and Safety. d. Cleaned lumber shall not be installed or enclosed by finish materials until approval of test results. Cleaned lumber must meet moisture content requirements as required elsewhere in this specification prior to installation or application of finishes.

1.04 STORAGE, HANDLING AND PROTECTION
A. The materials supplied as part of the Work of this section shall be protected from exposure to inclement weather before being covered by other Work.

PART 2 - PRODUCTS

2.01 MATERIALS
A. Lumber: Structural and framing lumber shall be of following species and grades:

INSTALLATION SPECIES GRADE

1. Subfloor, wallsheathing, roof
sheathing and ceiling furring
Douglasfir
and larch
Construction Board,
WCLIB; WWPA

Page 812 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -3

2. Posts, (5-inch by 5-inch and larger,
width not more than 2 inches greater
than thickness).

Douglasfir
and larch
No. 1 or better Structural
Posts and Timbers, WCLIB.

No. 1 or better Post and
Timbers, WWPA.

3. Beams, girders and truss members Douglas fir No. 1 or better Structural (5-inch and thicker, rectangular,
width more than 2-inches greater than
thickness) where exposed
as finish members.
and larch Beams and Stringers,
WCLIB; WWPA.

4. Joists, rafters, lintels, posts, Douglas fir No. 1 or better; mullions and members (2 to 4-inch
thick, 2 to 4-inch wide)
and larch Structural Light
Framing, WCLIB;

5. Other lumber (2 to 4-inch thick, Douglas fir Construction Light 2 to 4-inch wide) not specified
in subparagraph 5 above.
and larch Framing WCLIB; WWPA

6. Framing lumber (2 to 4-inch thick, Douglas fir No. 1 or better Structural 5-inch and wider). and Larch Joists and Planks,
WCLIB; WWPA.

7. Mudsills and plates in contact Douglas fir Same as subparagraphs with earth. and Larch
Treated
5 and 6.

8. Sills or plates installed on concrete Douglas fir Same as subparagraphs or masonry surfaces 6 inches or less
above earth or finish grade.
and Larch
Treated
5 and 6.

9. Sills, foundation plates and sleepers Douglas fir Same as subparagraphs installed on concrete, masonry
foundations, or installed
on concrete slab in direct contact
with earth.
and Larch
treated
5 and 6.

10. Miscellaneous nailing strips and Douglas fir Same as blocks embedded in concrete or and Larch subparagraphs
masonry. treated 5 and 6.

B. Plywood: Plywood furnished for structural purposes, when exposed outdoors, shall be exterior type plywood. Other plywood furnished for structural purposes shall be exterior type, or Exposure 1.

C. OSB Board or Panels:

1. Oriented strand board or panels shall not be furnished as part of the Work of this section.

D. Preservative Treated Wood:

Page 813 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -4

1. Wood and plywood specified; as treated wood shall be pressure treated wood in accordance with CBC requirements.

2. Seasoning: Treated lumber shall be air seasoned after treatment, for a minimum of two weeks before installation. Moisture content shall be 15 percent maximum.

3. Creosote or arsenic is not permitted for treating wood.

4. When treated wood member have been notched, dapped, drilled, or cut, such newly cut surfaces shall be painted with a heavy coat of the same preservative material originally provided for treatment of wood member.

E. Fire Retardant Protection: Wood and plywood specified as fire retardant protected wood shall be treated by approved methods and materials and shall be dried following treatment to maximum moisture content as follows:

1. Solid sawn lumber 2-inch thick or less: 19 percent.

2. Plywood: 15 percent.

F. Plywood Subflooring: Underlayment, Group 1, Exposure 1; of thickness indicated.

G. Mineral Fiber Panels: Asbestos-free, thickness as indicated.

H. Adhesive: Elastomeric adhesive – follow manufacturer’s installation instructions. Product must be approved by OWNER Office of Environmental Health and Safety and conform to ASTM D 3498 or APA-AFG-01.

PART 3 - EXECUTION

3.01 FASTENINGS
A. Nails and Spikes:

1. Furnish only common wire nails or spikes whenever indicated, specified or required.

2. Whenever necessary to prevent splitting, holes shall be pre-drilled for nails and spikes.

3. Nails in plywood shall not be overdriven.

4. Machine Applied Nailing: Use of machine nailing is subject to a satisfactory Project site demonstration for each Project and approval by the Architect or structural engineer retained by the Architect as an Architect Consultant and DSA. Installation is subject to continued satisfactory performance. Machine nailing is not permitted for 5/16 inch plywood. Do not permit nail heads to penetrate outer ply. Maintain minimum allowable edge distances when installing nails.

B. Lag Screws:

1. When installing lag screws in a wood member, pre-drill hole as required by the CBC.

Page 814 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -5

2. Lag screws, which bear on wood, shall be fitted with standard steel plate washers under head. Lag screws shall be screwed and not driven into place.

C. Bolts:

1. Lumber and timber to be fastened together with bolts shall be clamped together with holes for bolts bored true to line.

2. Bolts shall be fitted with steel plates or standard cut washers under heads and nuts. Bolts shall be tightened when installed and again before completion of the Work of this section.

D. Wood Screws: When installing wood screws, pre-drill holes as required by the CBC.

E. Metal Framing Devices: Framing anchors, joist hangers, ties, and other mechanical fastenings shall be galvanized or furnished with a rust inhibitive coating. Nails and fastenings shall be of the type recommended by manufacturer.

F. Powder Driven Fasteners:

1. Loads shall not exceed 75 pounds unless indicated on the Drawings or when reviewed by the Architect.

2. The operator, tool, and fastener shall perform the following as observed by the Inspector.
a. Observe installation of first 10 fasteners.
b. Test the first 10 fasteners by performing a pullout test. Load shall be at least twice the design load, or 150 pounds, whichever is greater. c. Random testing:
1) Load less than 75 pounds - approximately 1 in 10 pins. 2) Load 75 pounds or greater - 1/2 of the pins.

3. Failure of any test will result in testing of all installed pins.

4. Nail heads shall not break the outer skin of sheathing.

5. Non-compliant pins shall be replaced.

3.02 INSTALLATION
A. Stud Walls, Partitions and Furring:

1. Wood stud walls, partitions and vertical furring shall be constructed of members of size and spacing indicated. Provide single treated plate at bottom and double plate at top unless otherwise indicated. Interior, nonbearing non-shear partitions may be framed with a single top plate, installed to provide overlapping at corners and at inter- sections with other wall and partitions or by metal ties as detailed.

Page 815 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -6

2. Walls and partitions shall be provided with horizontal staggered blocking at least 2 inch nominal thickness and same width as studs, fitted snugly, and nailed into studs.

Blocking shall be installed at mid-height of partition or not more than 7 feet on center vertically. Install wood backing on top of top plate wherever necessary for nailing of lath or gypsum board.

3. Walls, partitions and furred spaces shall be provided with 2-inch nominal thickness wood firestops, same width as space to be firestopped, at ceiling line, mid-height of partition and at floor line. Firestops at floor line are not required when floor is concrete.

If width of opening is such that more than one piece of lumber is necessary, provide two thicknesses of one inch nominal material installed with staggered joints.

4. Firestops shall be installed in stud walls and partitions, including furred spaces, so the maximum dimension of any concealed space is not over 10 feet.

5. Corners, and where wood stud walls and wood vertical furring meet, shall be constructed of triple studs. Openings in stud walls and partitions shall be provided with headers as indicated and a minimum of 2 studs at jambs, one stud of which may be cut to support header in bearing.

6. Where wood and masonry or concrete walls intersect, end stud shall be fastened at top, bottom and mid-height with one 1/2 inch diameter bolt through stud and embedded in masonry or concrete a minimum of 4 inches. Bolts shall be provided with washers under nuts.

7. Sills under bearing, exterior or shear walls shall be bolted to concrete with 5/8 inch diameter by 12-inch long bolts with nuts and washers, spaced not more than 4 feet on center unless noted otherwise. There shall be a bolt within 9 inches of each end of each piece of sill plate. Sills shall be installed and leveled with shims, washers, with nuts tightened to level bearing. Space between sill and concrete shall be dry packed with cement grout.

B. Floor Joists, Roof and Ceiling Framing:

1. Wood joists shall be of the size and spacing indicated, installed with crown edge up, and shall have at least 4-inch bearing at supports. Provide 2-inch solid blocking, cut in between joists, same depth as joists, at ends and bearings, unless otherwise indicated.

2. Floor joists of more than 4 inches in depth and roof joists of more than 8 inches in depth shall be provided with bridging. Floor joists shall be bridged every 8 feet with solid blocking or metal cross bridging. Roof joists shall be bridged every 10 feet.

3. Joists under and parallel to bearing partitions shall be doubled and nailed or bolted together as detailed. Whenever a partition containing piping runs parallel to floor joists, joists underneath shall be doubled and spaced to permit passage of pipes and blocked with solid blocking spaced at not more than 4 feet intervals.

4. Trimmer and header joists shall be doubled, when span of header exceeds 4 feet. Ends of header joists more than 6 feet long shall be supported by framing anchors or joist hangers unless bearing on a beam, partition, or wall. Tail joists over 12 feet long shall be supported at header by framing anchors or on ledger strips at least 2 by 4.

5. Provide solid blocking between rafters and ceiling joists over partitions and at end supports where indicated.

Page 816 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -7
C. Subflooring:

1. Floor sheathing: Plywood of thickness and nailing indicated. Install with the face grain direction across supports, end joints staggered and centered over supports. Provide solid blocking under plywood edges where indicated. In addition to nailing, sheets of plywood flooring shall be secured in place with elastomeric adhesive, installed at beams, joints, perimeter supports and panel edges.

D. Roof and Wall Sheathing:

1. Plywood roof sheathing shall be Structural I, Grade C-D, Exposure 1, thickness as indicated.

2. Where exposed roof sheathing is indicated, area shall be sheathed solid with dressed and center matched, V-jointed boards of sizes indicated. Boards shall be installed perpendicular to supports.

3. Soffits of overhanging eaves, where indicated, shall be boxed-in using Group I, Exterior Type, Grade A-C, plywood, thickness as indicated.

4. Plywood for shear walls shall be Structural I, Grade C-D Exterior Type, thickness as indicated. Install with the long dimension parallel or perpendicular to the supports.

Blocking shall be provided behind edges not located over supports. Shear wall construction, nailing, and top and bottom anchorage shall be as indicated.

5. Provide and install metal H-clips of required size, midway between rafters at unsupported edge joints of plywood roof sheathing where rafters are spaced at 24 inches on center. Clips shall be Plyclips, by Timber Fasteners Inc., Panel Clips by Simpson Co., USP Structural Connectors, or equal.

E. Attic Space Partitions and Attic Walkways:

1. Attic space partitions shall be constructed of 2 by 4 wood members spaced at 2 feet on center maximum with 5/8 inch gypsum board.

2. Doors in attic space partitions shall be self-closing, of the same sheathing material as partition, constructed with 2 battens and a diagonal brace across back.

3. Shear walls passing through attic space shall be sheathed with 5/8 inch gypsum board on each side.

4. Attic walkways shall be constructed of 2 by 12 planks installed one-inch apart and nailed at each support with three 16d nails.

F. Furring:

1. Rafters or ceiling joists indicated to be furred for support of materials other than acoustical tile shall be furred with 2 by 4 wood members installed at right angles to supports, spaced as indicated and nailed in place. Furring shall be aligned, and bottoms shall be leveled by installing wood shims as required, and nailed as indicated.

2. Furring for protective wall padding in gymnasium shall be 1 by 3 Douglas fir, Construction Boards, S1S1E; applied horizontally to concrete walls at top and bottom of padding panels; and at uniform intermediate spacing not more than 18 inches on

Page 817 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -8
center. Stripping shall be shimmed where required, aligned to a true plane, and secured to concrete walls with concrete nails at not more than 18 inches on center.

G. Furring: Where metal furring is not indicated or specified, provide wood furring at points indicated and required for concealing conduit, piping, structural framing or other unfinished materials. Wood furring shall be 2-by studs of required width. Vertical members contacting concrete or masonry shall be attached as specified for anchoring interior wood stud partitions.

H. Grounds:

1. Provide and set wood grounds at points where wood trim occurs and work is to be plastered. Grounds at 3/4 inch metal lath shall be 5/8 inch thick, net, 1 ½-inch wide Douglas Fir, S1S. Grounds shall be doubled where trim member exceeds 5-inch width, or wherever indicated. Grounds shall be applied after lath has been installed set plumb, level and true to line.

2. Apply grounds over wood framed surfaces and lath and securely nail to wood backing at each stud or bearing. Grounds applied over steel channel studs and lath shall be securely nailed at each stud or bearing to nail-blocks provided and installed in metal studs.

3. Grounds applied to concrete surfaces shall be securely nailed to woodblocks provided and built into concrete.

I. Nailing Strips and Plates:

1. Provide wood nailing strips, plates and blocking indicated or required. Nailing strips in connection with metal work shall be bolted to metal. Wood nailing blocks for securing grounds shall be built into concrete, or masonry.

2. Nailing schedule shall comply with CBC requirements.

3. Treated wood nailing strips for lightweight insulated concrete roof decks at eaves, ridges, rakes, base of curbs and wherever else indicated, shall be provided and installed.

Strips shall be treated Douglas fir, 4 inches (nominal) width by thickness of insulated concrete.

J. Wood Backing: Provide wood backing as indicated and as required to receive plumbing, electrical fixtures and equipment, cabinets, door stop plates and other fixed equipment.

K. Wood Bucks: Furnish and set wood bucks to form openings for doors and other openings in concrete or masonry walls and in steel stud or channel partitions and furring. Bucks shall be Douglas fir, S1S2E, 2 inches (nominal) thickness and of width indicated or required. Bucks in connection with concrete shall be bolted thereto, and bucks in masonry walls shall be attached by means of strap anchors embedded in masonry joints. Bucks in connection with steel studs and metal channels shall be secured with nails or screws spaced not to exceed 24 inches on centers.

L. Bench Tops and Backs: Tops and backs shall be 3/4 inch thick asbestos free board, fabricated to minimize number of joints. Edges shall be neatly cut, smoothly finished and joints accurately fitted and butted. Tops and backs shall be secured with countersunk flathead galvanized wood screws. At bench with steel pan, apply with manufacturer's recommended adhesive. Cut and drill as required for Work to be attached to benches.

Page 818 of 2548 ends

CIP 689 - Clark Building Renovations
ROUGH CARPENTRY 061000 -9

3.03 CLEAN UP
A. Remove rubbish, debris and waste materials and legally dispose of off the Project site.

3.04 PROTECTION
A. Protect the Work of this section until Substantial Completion.

END OF SECTION

Page 819 of 2548 ends

CIP 689 - Clark Building Renovations
BUILDING INSULATION 072100 - 1
SECTION 072100 - BUILDING INSULATION
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Concealed thermal and sound insulation.

2. Soundproofing blanket.

1.3 DEFINITIONS
A. Mineral-Fiber Insulation: Insulation composed of rock-wool fibers, slag-wool fibers, or glass fibers; produced in boards and blanket with latter formed into batts (flat-cut lengths) orrolls.

1.4 SUBMITTALS
A. Product Data: For each type of product indicated.

B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency for insulation products.

1.5 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of building insulation through one source from a single manufacturer.

B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-testresponse characteristics indicated, as determined by testing identical products per test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.

1. Surface-Burning Characteristics: ASTM E 84.

2. Fire-Resistance Ratings: ASTM E 119.

3. Combustion Characteristics: ASTM E 136.

Page 820 of 2548 ends

CIP 689 - Clark Building Renovations
BUILDING INSULATION 072100 - 2

1.6 DELIVERY, STORAGE, AND HANDLING
A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.

1.7 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agreesto repair or replace components of building insulation that fails in materials or workmanship within specified warranty period.

1. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Glass-Fiber Batt/Blanket Thermal and Sound Insulation: Subject to compliance with requirements, provide either the named product or an equal product by one of the other manufacturers specified.

1. Johns Manville (JM). (Basis of Design)

2. CertainTeed Corporation.

3. Guardian Fiberglass, Inc.

4. Knauf Fiber Glass.

5. Owens Corning.

6. Lamtec.

7. Or equal.

B. Soundproofing Blanket:

1. Acoustical Solutions. (Basis of Design)

2. Or equal.

2.2 GLASS-FIBER BATT/BLANKET INSULATION
A. Unfaced, Glass-Fiber Batt/Blanket Insulation: ASTM C 665, Type I (blankets without membrane facing); consisting of fibers; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics. Glass- fiber bonded with acrylic thermosetting binder.

1. For walls and partitions: Unfaced Batts.

2. Formaldehyde-free, Unfaced Batts by JM or equal.

B. Sound Attenuation Ratings: Minimum R-11 on interior walls and partitions, unless otherwise indicated on Drawings.

Page 821 of 2548 ends

CIP 689 - Clark Building Renovations
BUILDING INSULATION 072100 - 3

2.3 SOUNDPROOFING BLANKET
A. Product: AudioSeal soundproofing blanket by Acoustical Solutions or equal.

1. Description: The PrivacyShield® Industrial Absorptive Soundproofing Blanket is a barrier backed sound panel used to block and absorb sound for interior, high-temperature applications. This barrier backed composite can be used in areas with a temperature up to 550° F making them well suited for machinery housings and other industrial applications.

These soundproof curtains are composed of a highly durable silicone-coated fiberglass cloth quilted to 1 in. or 2 in. thick fiberglass batting that is reinforced with a 1 lb. per sq. ft. mass loaded vinyl barrier bonded to one side. This product offers the benefits of a noise barrier and a sound absorber. The absorptive quilted fiberglass side of the blanket should face towards the sound you wish to absorb.

B. Thickness and Color: As indicated on Drawings.

2.4 ACCESSORIES
A. Tape: Bright aluminum self-adhering type, mesh reinforced, 2 inches wide.

B. Nails or Staples: Steel wire; electroplated, or galvanized; type and size to suit application.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements of Sections in which substrates and related work are specified and for other conditions affecting performance.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Clean substrates of substances harmful to insulation or vapor retarders, including removing projections capable of puncturing vapor retarders or of interfering with insulation attachment.

3.3 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and application indicated.

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any time to ice, rain, and snow.

C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.

Page 822 of 2548 ends

CIP 689 - Clark Building Renovations
BUILDING INSULATION 072100 - 4
D. Water-Piping Coordination: If water piping is located within insulated exterior walls, coordinate location of piping to ensure that it is placed on warm side of insulation and insulation encapsulates piping.

E. For preformed insulating units, provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness.

3.4 INSTALLATION OF GENERAL BUILDING INSULATION
A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.

B. Seal joints between foam-plastic insulation units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer.

C. Install insulation in cavities formed by framing members according to the following requirements:

1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill cavity, provide lengths that will produce a snug fit between ends.

2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.

3. Maintain 3-inch clearance of insulation around recessed lighting fixtures.

4. Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.

5. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping stapling flanges to flanges of metal studs.

3.5 INSTALLATION OF INSULATION IN CEILINGS
A. Install insulation to achieve thermal indicated attached to roof or floor deck from below.

B. Install insulation to roof or floor deck by adhesively attached, spindle-type insulation anchors as follows:

1. Fasten insulation anchors to deck substrates with insulation anchor adhesive according to anchor manufacturer's written instructions. Space anchors according to insulation manufacturer's written instructionsfor insulation type, thickness, and application indicated.

2. After adhesive has dried, install insulation by pressing insulation into position over spindles and securing it tightly in place with insulation-retaining washers, taking care not to compress insulation below required thickness.

3. Where insulation will not be covered by other building materials, apply capped washers to tips of spindles.

Page 823 of 2548 ends

CIP 689 - Clark Building Renovations
BUILDING INSULATION 072100 - 5

3.6 PROTECTION
A. Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.

END OF SECTION 072100

Page 824 of 2548 ends

CIP 689 - Clark Building Renovations
FLEXIBLE SHEET FLASHING 076500 - 1
SECTION 076500 - FLEXIBLE SHEET FLASHING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Flexible sheet flashing for windows, door, parapets, and other openings and where indicated on Drawings.

1.3 SUBMITTALS
A. Concurrent Review Requirements: Submit submittals of this section with doors and windows sections.

B. Product Data: Include manufacturer's written instructions for evaluating, preparing, and treating substrate, technical data, and tested physical and performance properties of flexible sheet flashing.

C. Shop Drawings: Show locations and extent of flexible sheet flashing. Include details for substrate joints and cracks, sheet flashings, penetrations, inside and outside corners, tie-ins with adjoining waterproofing, and other termination conditions.

D. Samples: For the following products:

1. 12-by-12-inch square of flexible sheet flashing.

E. Installer Certificates: Signed by manufacturers certifying that installers comply with requirements.

F. Qualification Data: For Installer.

G. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for flexible sheet flashing.

1.4 QUALITY ASSURANCE
A. Installer Qualifications: A firm that is acceptable to flexible sheet flashing manufacturer for installation of flexible sheet flashing required for this Project.

B. Source Limitations: Obtain flexible sheet flashing materials through one source from a single manufacturer.

Page 825 of 2548 ends

CIP 689 - Clark Building Renovations
FLEXIBLE SHEET FLASHING 076500 - 2
C. Mockups: Build mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Build mockup with doors and windows.

D. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." Review methods and procedures related to flexible sheet flashing including, but not limited to, the following:

1. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

2. Review and discuss the flashing to be coordinated with the finishing of doors and windows.

3. Review, discuss, and coordinate the interrelationship of flexible flashing with other exterior wall components. Include provisions for sealants and fasteners.

4. Review and discuss the sequence of work required to construct a watertight and weathertight exterior building envelope.

5. Inspect and discuss the condition of substrate and other preparatory work performed by other trades.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver liquid materials to Project site in original packages with seals unbroken, labeled with manufacturer's name, product brand name and type, date of manufacture, and directions for storing and mixing with other components.

B. Store liquid materials in their original undamaged packages in a clean, dry, protected location and within temperature range required by flexible sheet flashing manufacturer.

C. Remove and replace liquid materials that cannot be applied within their stated shelf life.

D. Store rolls according to manufacturer's written instructions.

E. Protect stored materials from directsunlight.

1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of flexible sheet flashing that fails in materials or workmanship within specified warranty period.

1. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Flexible Sheet Flashing: Subject to compliance with requirements, provide either the named product or an equal product by one of the other manufacturers specified.

Page 826 of 2548 ends

CIP 689 - Clark Building Renovations
FLEXIBLE SHEET FLASHING 076500 - 3

1. Vycor Plus by WR Grace (Basis of Design).

2. FortiFlash by Fortifiber.

3. FlexWrap and StraightFlash by DuPont.

4. Or equal.

2.2 FLEXIBLE SHEET FLASHING
A. Self-Adhered, cross-laminated high-density polyethylene (HDPE) sheet, backed by aggressive pressure-sensitive rubberized asphalt adhesive.

1. Thickness: 25 mil minimum per ASTM D3767, Method A.

2. Low temperature flexibility: Unaffected at minus 45 degrees F. per ASTM D1970.

3. Elongation, ultimate failure of rubberized asphalt: 200 percent minimum per ASTM D412.

4. Cracked cycling 100 cycles: Unaffected at minus 25 degrees F. per ASTM C836.

5. Lap adhesion at minimum application temperature: 60 plf width per ASTM D1876 modified.

6. Adhesion to concrete at minimum application temperature: 60 plf width per ASTM D903.

7. ICBO: ER-6141.

8. Recommended exposure limit: 30 days.

9. Perm-A-Barrier by Grace is not acceptable.

2.3 AUXILIARY MATERIALS
A. Mastic, Joint Sealant, Adhesives, and Tape: Liquid mastic and adhesives, and adhesive tapes recommended by flexible sheet flashing manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance.

1. Verify that concrete has cured and aged for minimum time period recommended by flexible sheet flashing manufacturer.

2. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Install flexible sheet flashing in accordance with the manufacturer’s written instructions, AAMA Publication 2400, and the applicable code.

END OF SECTION 076500

Page 827 of 2548 ends

CIP 689 - Clark Building Renovations
ROOF ACCESSORIES 077200 - 1
SECTION 077200 - ROOF ACCESSORIES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Roof hatches.

B. Related Sections:

1. Division 5 Section "Aluminum Ladders” for metal ladders, to roof hatches.

2. Division 9 Section “Painting” for field finishes.

1.3 SUBMITTALS
A. Product Data: For each type of roof accessory indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

B. Warranty: Special warranty specified in this Section.

1.4 QUALITY ASSURANCE
A. Sheet Metal Standard: Comply with SMACNA's "Architectural Sheet Metal Manual" details for fabrication of units, including flanges and cap flashing to coordinate with type of roofing indicated.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Pack, handle, and ship roof accessories properly labeled in heavy-duty packaging to prevent damage.

1.6 PROJECT CONDITIONS
A. Field Measurements: Verify required openings for each type of roof accessory by field measurements before fabrication and indicate measurements on Shop Drawings.

Page 828 of 2548 ends

CIP 689 - Clark Building Renovations
ROOF ACCESSORIES 077200 - 2

1.7 COORDINATION
A. Coordinate layout and installation of roof accessories with roofing membrane and base flashing and interfacing and adjoining construction to provide a leakproof, weathertight, secure, and noncorrosive installation.

1.8 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agreesto repair or replace components of roof accessories that fails in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Roof Hatches: Subject to compliance with requirements, provide either the named product or an equal product by one of the other manufacturers specified.

1. Bilco Company (The). (Basis of Design)

2. Milcor Inc.; a Gibraltar Company.

3. Nystrom, Inc.

4. O'Keeffe's Inc.

5. ThyCurb; Div of Thybar Corporation.

6. Or equal.

2.2 METAL MATERIALS
A. Galvanized Steel Sheet: ASTM A 653, G90 coated and mill phosphatized for field painting.

1. Comply with Division 9 Section “Painting” for field finishes.

2.3 ROOF HATCHES
A. General: Fabricate roof hatches with integral deck mounting flange and lid frame counterflashing.

Fabricate with welded or mechanically fastened and sealed corner joints. Provide continuous weathertight perimeter gasketing and equip with corrosion-resistant or hot-dip galvanized hardware.

B. Product: Type S or E depending on size by Bilco or equal.

1. Type: Galvanized 14 gauge paint bond G-90 galvanized steel single (S) or double-leaf(E) lid as indicated on Drawings.

2. Size: As indicated on Drawings.

Page 829 of 2548 ends

CIP 689 - Clark Building Renovations
ROOF ACCESSORIES 077200 - 3

3. Cover:
a. 3 inch beaded flange with formed reinforcing members. Cover shall have a heavy extruded EPDM rubber gasket that is bonded to the cover interior to assure a continuous seal when compressed to the top surface of the curb. b. Operation of the cover shall be smooth and easy with controlled operation throughout the entire arc of opening and closing.
c. Operation of the cover shall not be affected by temperature. d. Entire hatch shall be weather tight with fully welded corner joints on cover and curb.

4. Cover insulation: Shall be fiberglass of 1 inch thickness, fully covered and protected by a metal liner 22 gauge paint bond G-90 galvanized steel.

5. Curb: 12 inch in height with integral capflashing, 1 inch fiberboard insulation, fully welded at corners, and 3-1/2 inch mounting flange with 7/16 inch holes provided for securing frame to the roof deck.

6. Curb insulation: Shall be rigid, high-density fiberboard of 1 inch thickness on outside of curb.

7. Ladder Safety Post: Manufacturer's standard ladder safety post. Post to lock in place on full extension. Provide release mechanism to return post to closed position.

8. Factory Prime Finish:
a. Steel: Alkyd base red oxide primer.

9. Field Finish: Comply with Division 9 Section ”Painting”.

10. Hardware
a. Heavy pintle hinges shall be provided
b. Cover shall be equipped with a spring latch with interior and exterior turn handles c. Roof hatch shall be equipped with interior and exterior padlock hasps. d. The latch strike shall be a stamped component bolted to the curbassembly. e. Cover shall automatically lock in the open position with a rigid hold open arm equipped with a 1” diameter red vinyl grip handle to permit easy release for closing. f. Compression spring tubes shall be Type 316 stainless steel hardware. g. Cover hardware shall be bolted into heavy gauge channel reinforcing welded to the underside of the cover and concealed within the insulation space.

2.4 FINISH
A. Field finish per Division 9 Section “Painting”.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions, and other conditions affecting performance of work.

1. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored and is ready to receive roof accessories.

2. Verify dimensions of roof openings for roof accessories.

3. Proceed with installation only after unsatisfactory conditions have been corrected.

Page 830 of 2548 ends

CIP 689 - Clark Building Renovations
ROOF ACCESSORIES 077200 - 4

3.2 INSTALLATION
A. General: Install roof accessories according to manufacturer's written instructions. Anchor roof accessories securely in place and capable of resisting forces specified. Use fasteners, separators, sealants, and other miscellaneous items as required for completing roof accessory installation.

Install roof accessories to resist exposure to weather without failing, rattling, leaking, and fastener disengagement.

B. Install roof accessories to fit substrates and to result in watertight performance.

C. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or by other permanent separation as recommended by manufacturer.

1. Underlayment: Where installing exposed-to-view components of roof accessories directly on cementitious or wood substrates, install a course of felt underlayment and cover with a slip sheet, or install a course of polyethylene underlayment.

2. Bed flanges in thick coat of asphalt roofing cement where required by roof accessory manufacturers for waterproof performance.

D. Install roof accessories level, plumb, true to line and elevation, and without warping, jogs in alignment, excessive oil canning, buckling, or tool marks.

E. Roof Hatch Installation:

1. Check roof hatch for proper operation. Adjust operating mechanism as required. Clean and lubricate joints and hardware.

3.3 TOUCH UP
A. Touch up factory-primed surfaces with compatible primer ready for field painting in accordance with Division 9 painting Sections.

B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780.

3.4 CLEANING
A. Clean exposed surfaces according to manufacturer's written instructions.

END OF SECTION 077200

Page 831 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 1
SECTION 078413 - PENETRATION FIRESTOPPING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes:

1. Through-penetration firestop systems for penetrations through fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, whether indicated on drawings or not, and other openings indicated.

B. Related Sections include the following:

1. Division 7 Section "Fire-Resistive Joint Systems."

2. Division 7 Section "Joint Sealants" for non-fire-resistive jointsealants.

1.3 PERFORMANCE REQUIREMENTS
A. General: For penetrations through the following fire-resistance-rated constructions, including both empty openings and openings containing penetrating items, provide through-penetration firestop systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire- resistance rating of construction penetrated.

1. Fire-resistance-rated walls including fire walls, fire partitions, fire barriers, and smoke barriers.

2. Fire-resistance-rated horizontal assemblies including floors, floor/ceiling assemblies, and ceiling membranes of roof/ceiling assemblies.

B. Rated Systems: Provide through-penetration firestop systems with the following ratings determined per ASTM E 814 or UL 1479:

1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings indicated, but not less than that equaling or exceeding fire-resistance rating of constructions penetrated.

2. T-Rated Systems: For the following conditions, provide through-penetration firestop systems with T-ratings indicated, as well as F-ratings, where systems protect penetrating items exposed to potential contact with adjacent materials in occupiable floor areas:
a. Penetrations located outside wall cavities.
b. Penetrationslocated outside fire-resistance-rated shaft enclosures.

3. L-Rated Systems: Provide through-penetration firestop systems with L-ratings of not more than 3.0 cfm/sq. ft at both ambient temperatures and 400 deg F.

Page 832 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 2
C. For through-penetration firestop systems exposed to view, traffic, moisture, and physical damage, provide products that, after curing, do not deteriorate when exposed to these conditions both during and after construction.

1. For piping penetrations for plumbing and wet-pipe sprinkler systems, provide moistureresistant through-penetration firestop systems.

2. For floor penetrations with annular spaces exceeding 4 inches in width and exposed to possible loading and traffic, provide firestop systems capable of supporting floor loads involved, either by installing floor plates or by other means.

3. For penetrations involving insulated piping, provide through-penetration firestop systems not requiring removal of insulation.

D. For through-penetration firestop systems exposed to view, provide products with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, as determined per ASTM E 84.

1.4 SUBMITTALS
A. Product Data: For each type of product indicated.

B. Shop Drawings: For each through-penetration firestop system, show each type of construction condition penetrated, relationships to adjoining construction, and type of penetrating item.

Include firestop design designation of qualified testing and inspecting agency that evidences compliance with requirements for each condition indicated.

1. Submit documentation, including illustrations, from a qualified testing and inspecting agency that is applicable to each through-penetration firestop system configuration for construction and penetrating items.

2. Where Project conditions require modification to a qualified testing and inspecting agency's illustration for a particular through-penetration firestop condition, submit illustration, with modifications marked, approved by through-penetration firestop system manufacturer's fire-protection engineer as an engineering judgment or equivalent fireresistance-rated assembly.

C. Through-Penetration Firestop System Schedule: Indicate locations of each through-penetration firestop system, along with the following information:

1. Types of penetrating items.

2. Types of constructions penetrated, including fire-resistance ratings and, where applicable, thicknesses of construction penetrated.

3. Through-penetration firestop systems for each location identified by firestop design designation of qualified testing and inspecting agency.

D. Qualification Data: For Installer.

E. Product Test Reports: From a qualified testing agency indicating through-penetration firestop system complies with requirements, based on comprehensive testing of current products.

1.5 QUALITY ASSURANCE
A. Installer Qualifications: A firm experienced in installing through-penetration firestop systems similar in material, design, and extent to that indicated for this Project, whose work has resulted

Page 833 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 3
in construction with a record of successful performance. Qualifications include having the necessary experience, staff, and training to install manufacturer's products per specified requirements. Manufacturer's willingness to sell its through-penetration firestop system products to Contractor or to Installer engaged by Contractor does not in itself confer qualification on buyer.

B. Installation Responsibility: Assign installation of through-penetration firestop systems and fireresistive joint systems in Project to a single qualified installer.

C. Source Limitations: Obtain through-penetration firestop systems, for each kind of penetration and construction condition indicated, through one source from a single manufacturer.

D. Fire-Test-Response Characteristics: Provide through-penetration firestop systems that comply with the following requirements and those specified in Part 1 "Performance Requirements" Article:

1. Firestopping tests are performed by a qualified testing and inspecting agency. A qualified testing and inspecting agency is UL, or another agency performing testing and follow-up inspection services for firestop systems acceptable to authorities having jurisdiction.

2. Through-penetration firestop systems are identical to those tested per testing standard referenced in "Part 1 Performance Requirements" Article. Provide rated systems complying with the following requirements:
a. Through-penetration firestop systems correspond to those indicated by reference to through-penetration firestop system designations listed by the following:
1) UL in its "Fire Resistance Directory."
E. Preinstallation Conference: Conduct conference at Project site to comply with requirements.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver through-penetration firestop system products to Project site in original, unopened containers or packages with intact and legible manufacturers' labels identifying product and manufacturer, date of manufacture, lot number, shelf life if applicable, qualified testing and inspecting agency's classification marking applicable to Project, curing time, and mixing instructions for multicomponent materials.

B. Store and handle materials for through-penetration firestop systems to prevent their deterioration or damage due to moisture, temperature changes, contaminants, or other causes.

1.7 PROJECT CONDITIONS
A. Environmental Limitations: Do not install through-penetration firestop systems when ambient or substrate temperatures are outside limits permitted by through-penetration firestop system manufacturers or when substrates are wet due to rain, frost, condensation, or other causes.

B. Ventilate through-penetration firestop systems per manufacturer's written instructions by natural means or, where this is inadequate, forced-air circulation.

Page 834 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 4

1.8 COORDINATION
A. Coordinate construction of openings and penetrating items to ensure that through-penetration firestop systems are installed according to specified requirements.

B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate through-penetration firestop systems.

C. Notify Owner's inspecting agency at least seven days in advance of through-penetration firestop system installations; confirm dates and times on days preceding each series ofinstallations.

D. Do not cover up through-penetration firestop system installations that will become concealed behind other construction until each installation has been examined by Owner's inspecting agency and building inspector, if required by authorities having jurisdiction.

1.9 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of through-penetration firestop system that fails in materials or workmanship within specified warranty period.

1. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Through-Penetration Firestop Systems: Subject to compliance with requirements, provide one of the through-penetration firestop systems for each application that are produced by one of the following manufacturers.

1. Hilti, Inc.

2. Specified Technologies Inc.

3. 3M; Fire Protection Products Division.

4. Or equal.

2.2 FIRESTOPPING, GENERAL
A. Compatibility: Provide through-penetration firestop systems that are compatible with one another; with the substrates forming openings; and with the items, if any, penetrating through- penetration firestop systems, under conditions of service and application, as demonstrated by throughpenetration firestop system manufacturer based on testing and field experience.

B. Accessories: Provide components for each through-penetration firestop system that are needed to install fill materials and to comply with Part 1 "Performance Requirements" Article. Use only components specified by through-penetration firestop system manufacturer and approved by qualified testing and inspecting agency for firestop systems indicated. Accessories include, but are not limited to, the following items:

Page 835 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 5

1. Permanent forming/damming/backing materials, including the following:
a. Slag-/rock-wool-fiber insulation.
b. Sealants used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state.
c. Fire-rated form board.
d. Fillers for sealants.

2. Temporary forming materials.

3. Substrate primers.

4. Collars.

5. Steel sleeves.

2.3 FILL MATERIALS
A. General: Provide through-penetration firestop systems containing the types of fill materials indicated in the Through-Penetration Firestop System Schedule at the end of Part 3 by referencing the types of materials described in this Article. Fill materials are those referred to in directories of referenced testing and inspecting agencies as "fill," "void," or "cavity" materials.

B. Cast-in-Place Firestop Devices: Factory-assembled devices for use in cast-in-place concrete floors and consisting of an outer metallic sleeve lined with an intumescent strip, a radial extended flange attached to one end of the sleeve for fastening to concrete formwork, and a neoprene gasket.

C. Latex Sealants: Single-component latex formulations that after cure do not re-emulsify during exposure to moisture.

D. Firestop Devices: Factory-assembled collars formed from galvanized steel and lined with intumescent material sized to fit specific diameter of penetrant.

E. Intumescent Composite Sheets: Rigid panels consisting of aluminum-foil-faced elastomeric sheet bonded to galvanized steel sheet.

F. Intumescent Putties: Nonhardening dielectric, water-resistant putties containing no solvents, inorganic fibers, or silicone compounds.

G. Intumescent Wrap Strips: Single-component intumescent elastomeric sheets with aluminum foil on one side.

H. Mortars: Prepackaged dry mixes consisting of a blend of inorganic binders, hydraulic cement, fillers, and lightweight aggregate formulated for mixing with water at Project site to form a nonshrinking, homogeneous mortar.

I. Pillows/Bags: Reusable heat-expanding pillows/bags consisting of glass-fiber cloth cases filled with a combination of mineral-fiber, water-insoluble expansion agents, and fire-retardant additives.

J. Silicone Foams: Multicomponent, silicone-based liquid elastomers that, when mixed, expand and cure in place to produce a flexible, nonshrinking foam.

Page 836 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 6
K. Silicone Sealants: Single-component, silicone-based, neutral-curing elastomeric sealants of grade indicated below:

1. Grade: Pourable (self-leveling) formulation for openings in floors and other horizontal surfaces, and nonsag formulation for openings in vertical and other surfaces requiring a nonslumping, gunnable sealant, unless indicated firestop system limits use to nonsag grade for both opening conditions.

2. Grade for Horizontal Surfaces: Pourable (self-leveling) formulation for openings in floors and other horizontal surfaces.

3. Grade for Vertical Surfaces: Nonsag formulation for openings in vertical and other surfaces.

2.4 MIXING
A. For those products requiring mixing before application, comply with through-penetration firestop system manufacturer's written instructions for accurate proportioning of materials, water (if required), type of mixing equipment, selection of mixer speeds, mixing containers, mixing time, and other items or procedures needed to produce products of uniform quality with optimum performance characteristics for application indicated.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of work.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Surface Cleaning: Clean out openings immediately before installing through-penetration firestop systemsto comply with firestop system manufacturer's written instructions and with the following requirements:

1. Remove from surfaces of opening substrates and from penetrating items foreign materials that could interfere with adhesion of through-penetration firestop systems.

2. Clean opening substrates and penetrating items to produce clean, sound surfaces capable of developing optimum bond with through-penetration firestop systems. Remove loose particles remaining from cleaning operation.

3. Remove laitance and form-release agents from concrete.

B. Priming: Prime substrates where recommended in writing by through-penetration firestop system manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.

C. Masking Tape: Use masking tape to prevent through-penetration firestop systems from contacting adjoining surfaces that will remain exposed on completion of Work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to

Page 837 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 7
remove smears from firestop system materials. Remove tape as soon as possible without disturbing firestop system's seal with substrates.

3.3 THROUGH-PENETRATION FIRESTOP SYSTEMINSTALLATION
A. General: Install through-penetration firestop systems to comply with Part 1 "Performance Requirements" Article and with firestop system manufacturer's written installation instructions and published drawings for products and applications indicated.

B. Install forming/damming/backing materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated.

1. After installing fill materials and allowing them to fully cure, remove combustible forming materials and other accessories not indicated as permanent components of firestop systems.

C. Install fill materials for firestop systems by proven techniques to produce the following results:

1. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating items as required to achieve fire-resistance ratings indicated.

2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.

3. For fill materials that will remain exposed after completing Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.

3.4 IDENTIFICATION
A. Identify through-penetration firestop systems with preprinted metal or plastic labels. Attach labels permanently to surfaces adjacent to and within 6 inches of edge of the firestop systems so that labels will be visible to anyone seeking to remove penetrating items or firestop systems. Use mechanical fasteners for metal labels. For plastic labels, use self-adhering type with adhesives capable of permanently bonding labels to surfaces on which labels are placed and, in combination with label material, will result in partial destruction of label if removal is attempted. Include the following information on labels:

1. The words "Warning - Through-Penetration Firestop System - Do Not Disturb. Notify Building Management of Any Damage."

2. Contractor's name, address, and phone number.

3. Through-penetration firestop system designation of applicable testing and inspecting agency.

4. Date of installation.

5. Through-penetration firestop system manufacturer's name.

6. Installer's name.

3.5 FIELD QUALITY CONTROL
A. Inspecting Agency: Owner will engage a qualified, independent inspecting agency to inspect through-penetration firestops. Independent inspecting agency shall comply with ASTM E 2174 requirements including those related to qualifications, conducting inspections, and preparing test reports.

Page 838 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 8
B. Where deficiencies are found, repair or replace through-penetration firestop systems so they comply with requirements.

C. Proceed with enclosing through-penetration firestop systems with other construction only after inspection reports are issued and firestop installations comply with requirements.

3.6 CLEANING AND PROTECTING
A. Clean off excess fill materials adjacent to openings as Work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop system manufacturers and that do not damage materials in which openings occur.

B. Provide final protection and maintain conditions during and after installation that ensure that through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce systems complying with specified requirements.

3.7 THROUGH-PENETRATION FIRESTOP SYSTEM LOCATION
A. For penetrations by non combustible items including steel pipe, copper pipe, rigid steel conduit and electrical metallic tubing (EMT), the following materials are acceptable:

1. Hilti FS 601 Elastomeric Firestop Sealant.

2. Hilti FS ONE High Performance Intumescent Firestop Sealant.

3. 3M Fire Stop Sealant 2000 4. 3M Fire Barrier CP25 WB.

4. Tremco Tremstop Fyre Sil Sealant.

5. Or equal.

B. For penetrations by combustible items (penetrants consumed by high heat aflame) including insulated metal pipe, PVC jacketed, flexible cable or cable bundles and plastic pipe (closed piping systems) the following materials are acceptable:

1. Hilti FS ONE High Performance Intumescent Firestop Sealant.

2. Hilti CP 618 Firestop Putty.

3. Hilti CP 642 Firestop Jacket.

4. Hilti CP 643 Firestop Jacket.

5. 3M Fire Barrier CP25 WB.

6. 3M Fire Barrier FS 195 Wrap/Strip.

7. Tremco Tremstop WBM Intumescent Firestop Sealant.

8. Or equal.

C. For penetrations by combustible plastic pipe (open piping systems), the following materials are acceptable:

1. Hilti CP 642 Firestop Jacket.

2. Hilti CP 643 Firestop Jacket.

3. Hilti FS ONE High Performance Intumescent Firestop Sealant.

4. 3M Fire Barrier PPO Plastic Pipe Device.

5. Or equal.

Page 839 of 2548 ends

CIP 689 - Clark Building Renovations
PENETRATION FIRESTOPPING 078413 - 9
D. For large size/complex penetrations made to accommodate cable trays, multiple steel and copper pipes, electrical busways in raceways' the following materials are acceptable:

1. Hilti FS 635 Trowelable Firestop Compound.

2. Hilti FIRE BLOCK.

3. 3M Firestop Foam 2001.

4. 3M Fire Barrier CS 195 Composite Sheet.

5. Or equal.

END OF SECTION 078413

Page 840 of 2548 ends

CIP 689 - Clark Building Renovations
FIRE-RESISTIVE JOINT SYSTEMS 078446 - 1
SECTION 078446 - FIRE-RESISTIVE JOINT SYSTEMS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes fire-resistive joint systems for interruptions to fire rated assemblies, whether indicated on drawings or not, and other openings indicated.

B. Related Sections include the following:

1. Division 7 Section "Penetration Firestopping" for systems installed in openings in walls and floors with and without penetrating items.

2. Division 7 Section "Joint Sealants" for non-fire-resistive jointsealants.

1.3 PERFORMANCE REQUIREMENTS
A. General: Provide fire-resistive joint systems that are produced and installed to resist spread of fire according to requirements indicated, resist passage of smoke and other gases, and maintain original fire-resistance rating of assembly in which fire-resistive joint systems are installed.

B. Joint Systems in and between Fire-Resistance-Rated Constructions: Provide systems with assembly ratings equaling or exceeding the fire-resistance ratings of construction that they join, and with movement capabilities and L-ratings indicated as determined by UL 2079.

1. Load-bearing capabilities as determined by evaluation during the time of test.

C. For fire-resistive systems exposed to view, provide products with flame-spread and smokedeveloped indexes of less than 25 and 450, respectively, as determined per ASTM E 84.

1.4 SUBMITTALS
A. Product Data: For each type of product indicated.

B. Shop Drawings: For each fire-resistive joint system, show each kind of construction condition in which joints are installed; also show relationships to adjoining construction. Include fire- resistive joint system design designation of testing and inspecting agency acceptable to authorities having jurisdiction that demonstrates compliance with requirements for each condition indicated.

1. Submit documentation, including illustrations, from a qualified testing and inspecting agency that is applicable to each fire-resistive joint system configuration for construction and penetrating items.

Page 841 of 2548 ends

CIP 689 - Clark Building Renovations
FIRE-RESISTIVE JOINT SYSTEMS 078446 - 2
C. Product Certificates: For each type of fire-resistive joint system, signed by product manufacturer.

D. Qualification Data: ForInstaller.

E. Field quality-control test reports.

F. Evaluation Reports: Evidence of fire-resistive joint systems' compliance with ICBO ES AC30, from the ICBO Evaluation Service.

1.5 QUALITY ASSURANCE
A. Installer Qualifications: A firm that has been approved by FMG according to FMG 4991, "Approval of Firestop Contractors."
B. Installation Responsibility: Assign installation of through-penetration firestop systems and fireresistive joint systems in Project to a single qualified installer.

C. Source Limitations: Obtain fire-resistive joint systems, for each kind of joint and construction condition indicated, through one source from a single manufacturer.

D. Fire-Test-Response Characteristics: Provide fire-resistive joint systems that comply with the following requirements and those specified in Part 1 "Performance Requirements" Article:

1. Fire-resistance tests are performed by a qualified testing and inspecting agency. A qualified testing and inspecting agency is UL or another agency performing testing and follow-up inspection services for fire-resistive joint systems acceptable to authorities having jurisdiction.

2. Fire-resistive joint systems are identical to those tested per methods indicated in Part 1 "Performance Requirements" Article and comply with the following:
a. Fire-resistive joint system products bear classification marking of qualified testing and inspecting agency.
b. Fire-resistive joint systems correspond to those indicated by referencing system designations of the qualified testing and inspecting agency.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver fire-resistive joint system products to Project site in original, unopened containers or packages with qualified testing and inspecting agency's classification marking applicable to Project and with intact and legible manufacturers' labels identifying product and manufacturer, date of manufacture, lot number, shelf life, curing time, and mixing instructions for multicomponent materials.

B. Store and handle materials for fire-resistive joint systems to prevent their deterioration or damage due to moisture, temperature changes, contaminants, or other causes.

Page 842 of 2548 ends

CIP 689 - Clark Building Renovations
FIRE-RESISTIVE JOINT SYSTEMS 078446 - 3

1.7 PROJECT CONDITIONS
A. Environmental Limitations: Do not install fire-resistive joint systems when ambient or substrate temperatures are outside limits permitted by fire-resistive joint system manufacturers or when substrates are wet due to rain, frost, condensation, or other causes.

B. Ventilate fire-resistive joint systems per manufacturer's written instructions by natural means or, if this is inadequate, forced-air circulation.

1.8 COORDINATION
A. Coordinate construction of joints to ensure that fire-resistive joint systems are installed according to specified requirements.

B. Coordinate sizing of joints to accommodate fire-resistive joint systems.

C. Do not cover up fire-resistive joint system installations that will become concealed behind other construction until Owner's inspecting agency and building inspector of authorities having jurisdiction have examined each installation.

1.9 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of fire-resistive joint systems that fails in materials or workmanship within specified warranty period.

1. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Fire-Resistive Joint Systems: Subject to compliance with requirements, provide one of the through-penetration firestop systems for each application that are produced by one of the following manufacturers.

1. Hilti, Inc.

2. Specified Technologies Inc.

3. 3M; Fire Protection Products Division.

4. Or equal.

2.2 FIRE-RESISTIVE JOINT SYSTEMS
A. Compatibility: Provide fire-resistive joint systems that are compatible with joint substrates, under conditions of service and application, as demonstrated by fire-resistive joint system manufacturer based on testing and field experience.

Page 843 of 2548 ends

CIP 689 - Clark Building Renovations
FIRE-RESISTIVE JOINT SYSTEMS 078446 - 4
B. Accessories: Provide components of fire-resistive joint systems, including primers and forming materials, that are needed to install fill materials and to comply with Part 1 "Performance Requirements" Article. Use only components specified by fire-resistive joint system manufacturer and approved by the qualified testing and inspecting agency for systemsindicated.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for joint configurations, substrates, and other conditions affecting performance of work.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Surface Cleaning: Clean joints immediately before installing fire-resistive joint systems to comply with fire-resistive joint system manufacturer's written instructions and the following requirements:

1. Remove from surfaces of joint substrates foreign materials that could interfere with adhesion of fill materials.

2. Clean joint substrates to produce clean, sound surfaces capable of developing optimum bond with fill materials. Remove loose particles remaining from cleaning operation.

3. Remove laitance and form-release agents from concrete.

B. Priming: Prime substrates where recommended in writing by fire-resistive joint system manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.

C. Masking Tape: Use masking tape to prevent fill materials of fire-resistive joint system from contacting adjoining surfaces that will remain exposed on completion of Work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove smears from fire-resistive joint system materials. Remove tape as soon as possible without disturbing fire-resistive joint system's seal with substrates or damaging adjoining surfaces.

3.3 INSTALLATION
A. General: Install fire-resistive joint systems to comply with Part 1 "Performance Requirements" Article and fire-resistive joint system manufacturer's written installation instructions for products and applications indicated.

B. Install forming/packing/backing materials and other accessories of types required to support fill materials during their application and in position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated.

C. Install fill materials for fire-resistive joint systems by proven techniques to produce the following results:

Page 844 of 2548 ends

CIP 689 - Clark Building Renovations
FIRE-RESISTIVE JOINT SYSTEMS 078446 - 5

1. Fill voids and cavities formed by openings and forming/packing/backing materials as required to achieve fire-resistance ratings indicated.

2. Apply fill materials so they contact and adhere to substrates formed by joints.

3. For fill materials that will remain exposed after completing Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.

3.4 FIELD QUALITY CONTROL
A. Inspecting Agency: Engage a qualified independent inspecting agency to inspect fire-resistive joint systems and prepare inspection reports.

B. Testing Services: Inspecting of completed installations of fire-resistive joint systems shall take place in successive stages as installation of fire-resistive joint systems proceeds. Do not proceed with installation of joint systems for the next area until inspecting agency determines completed work shows compliance with requirements.

1. Inspecting agency shall state in each report whether inspected fire-resistive joint systems comply with or deviate from requirements.

C. Remove and replace fire-resistive joint systems where inspections indicate that they do not comply with specified requirements.

D. Additional inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

E. Proceed with enclosing fire-resistive joint systems with other construction only after inspection reports are issued and fire-resistive joint systems comply with requirements.

3.5 CLEANING AND PROTECTING
A. Clean off excess fill materials adjacent to joints as Work progresses by methods and with cleaning materials that are approved in writing by fire-resistive joint system manufacturers and that do not damage materials in which openings occur.

B. Provide final protection and maintain conditions during and after installation that ensure fireresistive joint systems are without damage or deterioration at time of Substantial Completion. If damage or deterioration occurs despite such protection, cut out and remove damaged or deteriorated fire-resistive joint systems immediately and install new materials to produce fireresistive joint systems complying with specified requirements.

3.6 FIRE-RESISTIVE JOINT SYSTEM LOCATION
A. For fire rated construction joints and other gaps, the following materials are acceptable:

1. FS 601 Elastomeric Firestop Sealant by Hilti.

2. CP 601 s Elastomeric Firestop Sealant by Hilti.

3. CP 606 Flexible Firestop Sealant by Hilti.

4. CP 672 Firestop Joint Spray by Hilti.

5. Firestop Sealant 2000 by 3M.

6. Tremstop Fyre Sil Sealant by Tremco.

Page 845 of 2548 ends

CIP 689 - Clark Building Renovations
FIRE-RESISTIVE JOINT SYSTEMS 078446 - 6

7. Or equal.

B. For openings between structurally separate sections of wall and floors. Top of walls, the following materials along with Thermafiber Safing are acceptable:

1. FS 60t Elastomeric Firestop Sealant by Hilti.

2. CP 601s Elastomeric Firestop Sealant by Hilti.

3. CP 606 Flexible Firestop Sealant. by Hilti

4. FS ONE High Performance Intumescent Firestop Sealant by Hilti.

5. Fire Barrier CP 25 WB by 3M.

6. Or equal.

C. Firestopping at Electrical Boxes and Utility Outlets.

1. CP 618 Firestop Putty Stick by Hilti.

2. CP 617 and CP 617L Firestop Putty Pad by Hilti.

3. Or equal.

END OF SECTION 078446

Page 846 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 1
SECTION 079200 - JOINT SEALANTS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes jointsealants.

1.3 PERFORMANCE REQUIREMENTS
A. Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous joint seals without staining or deteriorating joint substrates.

1.4 SUBMITTALS
A. Product Data: For each joint-sealant product indicated.

B. Samples for Initial Selection: Manufacturer's color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.

C. Product Certificates: For each type of joint sealant and accessory, signed by product manufacturer.

D. SWRI Validation Certificate: For each elastomeric sealant specified to be validated by SWRI's Sealant Validation Program.

E. Qualification Data: For Installer.

F. Compatibility and Adhesion Test Reports: From sealant manufacturer, indicating the following:

1. Materials forming joint substrates and joint-sealant backings have been tested for compatibility and adhesion with joint sealants.

2. Interpretation of test results and written recommendations for primers and substrate preparation needed for adhesion.

G. Product Test Reports: Based on comprehensive testing of product formulations performed by a qualified testing agency, indicating that sealants comply with requirements.

H. Warranties: Special warranties specified in this Section.

Page 847 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 2

1.5 QUALITY ASSURANCE
A. Installer Qualifications: Manufacturer's authorized Installer who is approved or licensed for installation of elastomeric sealants required for this Project.

B. Source Limitations: Obtain each type of joint sealant through one source from a single manufacturer.

1.6 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:

1. When ambient and substrate temperature conditions are outside limits permitted by jointsealant manufacturer or are below 40 deg F.

2. When joint substrates are wet.

3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.

4. Contaminants capable of interfering with adhesion have not yet been removed from joint substrates.

1.7 WARRANTY
A. Special Manufacturer's Warranty: Manufacturer's standard form in which elastomeric sealant manufacturer agrees to furnish elastomeric joint sealants to repair or replace those that do not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period: 2 years.

B. Special warranties specified in this Article exclude deterioration or failure of elastomeric joint sealants from the following:

1. Movement of the structure resulting in stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression caused by structural settlement or errors attributable to design or construction.

2. Disintegration of joint substrates from natural causes exceeding design specifications.

3. Mechanical damage caused by individuals, tools, or other outside agents.

4. Changes in sealant appearance caused by accumulation of dirt or other atmospheric contaminants.

C. Special Installer's Warranty: Installer's standard form in which Installer agrees to repair or replace elastomeric joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period: 2 years.

Page 848 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 3
PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Joint Sealants: Subject to compliance with requirements, provide either the named product or an equal product by one of the other manufacturers specified.

1. Pecora Corporation. (Basis of Design)

2. Bostik.

3. Dow Corning Corp.

4. GE Plastics.

5. Sonneborn Building Products, ChemRex, Inc.

6. Tremco, Inc.

7. Or equal.

2.2 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by sealant manufacturer, based on testing and field experience.

B. Colors of Exposed Joint Sealants:

1. As selected by Architect from manufacturer's full range.

2. Areas where concrete joint sealant will be adjacent to concrete other than standard gray, sealant color shall match adjacent color as approved by Architect.

2.3 MISCELLANEOUS MATERIALS
A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.

B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates.

C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting jointsealant performance.

Page 849 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 4
B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:

1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.

2. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air.

3. Remove laitance and form-release agents from concrete. a. Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants.

B. Joint Priming: Prime joint substrates, where recommended in writing by joint-sealant manufacturer, based on preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.

C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.

3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.

B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.

C. Acoustical Sealant Application Standard: Comply with recommendations in ASTM C 919 for use of joint sealants in acoustical applications as applicable to materials, applications, and conditions indicated.

D. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of sealant backings.

2. Do not stretch, twist, puncture, or tear sealant backings.

3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.

Page 850 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 5
E. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.

F. Install sealants using proven techniques that comply with the following and at the same time backings are installed:

1. Place sealants so they directly contact and fully wet joint substrates.

2. Completely fill recesses in each joint configuration.

3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.

G. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.

1. Remove excess sealant from surfaces adjacent to joints.

2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.

3. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless otherwise indicated.

4. Provide flush joint configuration where indicated per Figure 5B in ASTM C 1193.

5. Provide recessed joint configuration of recess depth and at locations indicated per Figure 5C in ASTM C 1193.
a. Use masking tape to protect surfaces adjacent to recessed tooled joints.

H. Installation of Preformed Tapes: Install according to manufacturer's written instructions.

I. Installation of Preformed Silicone-Sealant System: Comply with the following requirements:

1. Apply masking tape to each side of joint, outside of area to be covered by sealantsystem.

2. Apply silicone sealant to each side of joint to produce a bead of size complying with preformed silicone-sealant system manufacturer's written instructions and covering a bonding area of not less than 3/8 inch. Hold edge of sealant bead 1/4 inch inside masking tape.

3. Within 10 minutes of sealant application, press silicone extrusion into sealant to wet extrusion and substrate. Use a roller to apply consistent pressure and ensure uniform contact between sealant and both extrusion and substrate.

4. Complete installation of sealant system in horizontal joints before installing in vertical joints. Lap vertical joints over horizontal joints. At ends of joints, cut silicone extrusion with a razor knife.

J. Installation of Preformed Foam Sealants: Install each length of sealant immediately after removing protective wrapping, taking care not to pull or stretch material, producing seal continuity at ends, turns, and intersections of joints. For applications at low ambient temperatures where expansion of sealant requires acceleration to produce seal, apply heat to sealant in compliance with sealant manufacturer's written instructions.

3.4 CLEANING
A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of jointsealants and of products in which joints occur.

Page 851 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 6

3.5 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.

3.6 JOINT-SEALANT LOCATION
A. General Purpose Interior Sealant: Acrylic emulsion latex; ASTM C 834, Type OP, Grade NF single component, paintable.

1. Products:
a. AC-20 manufactured by Pecora.

2. Color: Standard colors matching finished surfaces.

3. Applications:
a. Interior wall and ceiling control joints.
b. Joints between door and window frames and wall surfaces. c. Other interior joints for which no other type of sealant isindicated.

B. Bathtub/Tile Sealant: Silicone; ASTM C 920, Uses I, M and A; single component, mildew resistant.

1. Products:
a. 898 Silicone Sanitary Sealant by Pecora.

2. Color: Match adjacent color.

3. Applications:
a. Joints between plumbing fixtures and floor and wallsurfaces. b. Joints between restroom countertops and wallsurfaces.

C. Acoustical Sealant: Butyl or acrylic sealant; ASTM C 920, Grade NS, Class 12-1/2, Uses M and A; single component latex sealant.

1. Acoustical Sealant for Exposed and Concealed Joints:
a. Quietseal Pro by QuietRock or equal. (Basis of Design) b. Pecora Corporation; AC-20 FTR Acoustical and Insulation Sealant. c. USG Corporation; SHEETROCK Acoustical Sealant.
d. Or equal.

2. Acoustical Sealant for Concealed Joints:
a. Quietseal Pro by QuietRock or equal. (Basis of Design) b. OSI Sealants, Inc.; Pro-Series SC-175 Rubber Base Sound Sealant. c. Pecora Corporation; BA-98.
d. Tremco, Inc.; Tremco Acoustical Sealant.
e. Or equal.

D. Interior Floor Joint Sealant: Polyurethane, chemically-curing, cold-applied, self-leveling elastomeric sealant; ASTM C 920, Grade P, Class 25, Uses T, M and A; two-part.

1. Products:
a. NR-200 self-leveling polyurethane and/or DYNATRED non-sag, traffic-grade polyurethane sealants by Pecora.

2. Primer: P-150, P-75 or P-200.

3. Color: Standard colors matching finished surfaces.

Page 852 of 2548 ends

CIP 689 - Clark Building Renovations
JOINT SEALANTS 079200 - 7

4. Applications: Use for joints up to 1-1/2 inches.
a. Expansion joints in floors.

E. Sanitary Sealants: Provide ASTM C920, Type S, Grade NS, Class 25, Use NT. When fully cured and washed, sealant shall meet the requirements of the Food and Drug Administration Regulation 21 CFR 177.2600 for use in areas where sealant comes in contact with food.

1. Color: As selected by Architect from manufacturer’s full range.

2. Backer Rod shall be closed-cell polyethylene rod stock, larger than joint width.

F. Butyl Sealant: ASTM C 920, Grade NS, Class 12-1/2, Uses NT, M, A, G, O; single component, solvent release, non-skinning, non-sagging.

1. Products:
a. BC-158 sealant by Pecora.

2. Color: Standard colors matching finished surfaces.

3. Movement Capability: Plus and minus 12-1/2 percent.

4. Service Temperature Range: -13 to 180 degrees F.

5. Shore A Hardness Range: 10 to 30.

G. Silicone Sealant: ASTM C 920, Grade NS, Class 25, Uses NT, A, G, M, O; single component, solvent curing, non-sagging, non-staining, fungus resistant, non-bleeding.

1. Products:
a. 864 LM Architectural silicone or 890 silicone sealant by Pecora. b. 790 by Dow Corning Corporation.

2. Color: Standard colors matching finished surfaces.

3. Movement Capability: Plus and minus 25 percent.

4. Applications:
a. Interior or exterior for joints 1/8 to 1-1/2 inch wide. b. Exterior use at expansion joints in masonry where substantial movement is expected. c. Glazing application.

END OF SECTION 079200

Page 853 of 2548 ends

CIP 689 - Clark Building Renovations
STILE AND RAIL WOOD DOORS 081433 - 1
SECTION 081433 - STILE AND RAIL WOOD DOORS
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes the following:

1. Stile and rail doors.

2. Wood frames.

B. Related Sections:

1. Division 9 Section “Painting” for painting of wood doors.

2. Division 8 Section “Glazing” for glass vision panels in stile and rail wood doors.

1.2 SUBMITTALS
A. Product Data: For each type of door.

B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; and other pertinent data.

C. Samples: For each species and finish required.

1.3 QUALITY ASSURANCE
A. Quality Standard for Doors of Stock Design and Construction: Comply with WDMA I.S.6A, "Industry Standard for Architectural Stile and Rail Doors." B. Safety Glass: Provide products complying with testing requirements in 16 CFR 1201, for Category II materials, unless those of Category I are expressly indicated and permitted.

1.4 PROJECT CONDITIONS
A. Environmental Limitations: Do not deliver or install doors until building is enclosed, wet work is complete, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period.

1.5 WARRANTY
A. Special Warranty: Manufacturer’s standard form, signed by manufacturer, installer and contractor, in which manufacturer agrees to repair or replace doors that are defective in materials or workmanship, and have warped (bow, cup or twist) more than 1/4 inch in a 42-by- 84 inch section.

1. Doors: 2 years.

Page 854 of 2548 ends

CIP 689 - Clark Building Renovations
STILE AND RAIL WOOD DOORS 081433 - 2
B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Stile and Rail Doors and Frames: Subject to compliance with requirements, provide either the named product or an equal product by one of the other manufacturers specified.

1. Masonite (Marshfield-Algoma, Graham-Maiman) Inc.

2. Eggers Industries; Architectural Door Division (VT Industries).

3. Or equal.

2.2 MATERIALS
A. Assemble doors, including components, with WDMA Type II adhesives.

B. Provide doors made with adhesives that do not contain urea-formaldehyde resins.

C. Provide interior doors made with composite wood products that have urea-formaldehyde emission levels below the published maximums in the ANSI A208.1-latest edition Particleboard standard.

2.3 STILE AND RAIL WOOD DOORS
A. WDMA Grade for Opaque Finish: Custom.

1. Wood Species for Opaque Finish: Manufacturer's standard mill option species and cut for stiles and rails; with panels of same species or wood-based composite materials.

B. Size, Layout and Thickness: As shown on Drawings.

2.4 NON-RATED WOOD DOOR FRAMES
A. Solid lumber frame, complete with casings.

B. Flat jambs:

1. Applied door stops, solid lumber - long, loose, and unmitered.

2.5 FABRICATION
A. Fabricate stile and rail wood doors in sizes indicated for Project-site fitting.

B. Factory fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of referenced quality standard for fitting.

C. Factory machine doors for hardware that is not surface applied.

Page 855 of 2548 ends

CIP 689 - Clark Building Renovations
STILE AND RAIL WOOD DOORS 081433 - 3
D. Glazed Openings: Glaze doors at factory with glass of type and thickness indicated, complying with Division 8 Section "Glazing." Glaze doors using solid wood moldings for non fire-rated.

E. Transom and Side Panels: Fabricate panels to match adjoining doors in materials, finish, and quality of construction.

2.6 SHOP PRIMING
A. Doors for Opaque Finish: Shop apply one coat of wood primer specified in Division 9 Section "Painting" to faces, edges and tops and bottoms of doors.

2.7 FINISH
A. Field painted per Division 9 Section “Painting”.

PART 3 - EXECUTION

3.1 INSTALLATION
A. Install wood doors to comply with manufacturer's written instructions and with referenced quality standard, and as indicated.

B. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.

END OF SECTION 081433

Page 856 of 2548 ends

CIP 689 - Clark Building Renovations
ACCESS DOORS AND FRAMES 083113 - 1
SECTION 083113 - ACCESS DOORS AND FRAMES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following:

1. Access doors and frames for walls and ceilings.

B. Related Sections include the following:

1. Division 9 Section “Painting” for field applied finishes.

1.3 SUBMITTALS
A. Product Data: For each type of access door and frame indicated. Include construction details, materials, individual components and profiles, and finishes.

B. Shop Drawings: Show fabrication and installation details of access doors and frames for each type of substrate. Include plans, elevations, sections, details, and attachments to other work.

C. Samples: For each door face material, at least 3 by 5 inches in size, in specified finish.

D. Access Door and Frame Schedule: Provide complete access door and frame schedule, including types, locations, sizes, latching or locking provisions, and other data pertinent to installation.

E. Ceiling Coordination Drawings: Reflected ceiling plans, drawn to scale, on which ceilingmounted items including access doors and frames, lighting fixtures, diffusers, grilles, speakers, sprinklers, and special trim are shown and coordinated with each other.

1.4 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of access door(s) and frame(s) through one source from a single manufacturer.

B. Size Variations: Obtain Architect's acceptance of manufacturer's standard-size units, which may vary slightly from sizes indicated.

Page 857 of 2548 ends

CIP 689 - Clark Building Renovations
ACCESS DOORS AND FRAMES 083113 - 2

1.5 COORDINATION
A. Verification: Determine specific locations and sizes for access doors needed to gain access to concealed plumbing, mechanical, or other concealed work, and indicate in the schedule specified in "Submittals" Article.

1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of access doors and frames that fails in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Warranty Period: 2 years.

B. Installer’s Warranty: 1 year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Access Doors and Frames: Subject to compliance with requirements, provide products by one of the following:

1. Karp Associates Inc.

2. Acudor.

3. Milcor Inc.

4. Nystrom, Inc.

5. Or equal.

2.2 STEEL MATERIALS
A. Steel Plates, Shapes, and Bars: ASTM A 36.

1. ASTM A 123, for galvanizing steel and iron products.

2. ASTM A 153, for galvanizing steel and iron hardware.

B. Steel Sheet: Cold-rolled steel sheet substrate complying with ASTM A 1008, Commercial Steel (CS), exposed.

C. Steel Finishes: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

1. Factory Surface Preparation for Steel Sheet: Clean surfaces to comply with SSPC-SP 1, "Solvent Cleaning," to remove dirt, oil, grease, or other contaminants that could impair paint bond. Remove mill scale and rust, if present, from uncoated steel, complying with SSPC-SP 5/NACE No. 1, "White Metal Blast Cleaning," or SSPC-SP 8, "Pickling."

2. Field Finish: Factory prime for field painting as specified in Division 9 “Painting”.

Page 858 of 2548 ends

CIP 689 - Clark Building Renovations
ACCESS DOORS AND FRAMES 083113 - 3
D. Drywall Beads: Edge trim formed from 0.0299-inch zinc-coated steel sheet formed to receive joint compound and in size to suit thickness of gypsum board.

2.3 ACCESS DOORS AND FRAMES FOR WALLS AND CEILINGS
A. Model RDW by Karp.

1. Type: Recessed door to receive drywall.

2. Frame shall be 14 gage steel and doors shall be 16 gage steel.

3. Door shall be recessed 1 inch.

4. Trim shall be galvanized steel dry wall bead.

5. Hinge shall be concealed pivoting rod type.

6. Locks shall be flush and screwdriver operated with stainless steel cam and studs, or shall be key operated cylinder lock with automatic dust shutter.

7. Finish shall be prime coat of rust inhibitive electrostatic powder, baked grey coat.

8. Door Sizes: As indicated on Drawings.

2.4 FABRICATION
A. General: Provide access door and frame assemblies manufactured as integral units ready for installation.

B. Metal Surfaces: For metal surfaces exposed to view in the completed Work, provide materials with smooth, flat surfaces without blemishes. Do not use materials with exposed pitting, seam marks, roller marks, rolled trade names, or roughness.

C. Doors and Frames: Grind exposed welds smooth and flush with adjacent surfaces. Furnish attachment devices and fasteners of type required to secure access panels to types of supports indicated.

1. Exposed Flanges: Nominal 1 to 1-1/2 inches wide around perimeter of frame.

D. Latching Mechanisms: Furnish number required to hold doors in flush, smooth plane when closed.

1. For cylinder lock, furnish two keys per lock and key all locks alike.

2.5 FINISHES
A. Field finish per Division 9 Section “Painting”.

PART 3 - EXECUTION

3.1 INSTALLATION
A. Comply with manufacturer's written instructions for installing access doors and frames.

B. Install doors flush with adjacent finish surfaces or recessed to receive finish material.

Page 859 of 2548 ends

CIP 689 - Clark Building Renovations
ACCESS DOORS AND FRAMES 083113 - 4

3.2 ADJUSTING AND CLEANING
A. Adjust doors and hardware after installation for proper operation.

B. Remove and replace doors and frames that are warped, bowed, or otherwise damaged.

END OF SECTION 083113

Page 860 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -1
SECTION 08 71 00

DOOR HARDWARE
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Door hardware.

1.2 REFERENCES:

A. Use date of standard in effect as of Bid date.

1. American National Standards Institute
a) ANSI 156.18 – Materials and Finishes.

2. BHMA – Builders Hardware Manufacturers Association

3. 2019 California Building Code
a) Chapter 11B – Accessibility To Public Buildings, Public Accommodations, Commercial Buildings and Public Housing

4. DHI – Door and Hardware Institute

5. NFPA – National Fire Protection Association
a) NFPA 80 2016 Edition – Standard for Fire Doors and Other Opening Protectives.
b) NFPA 105 – Smoke and Draft Control Door Assemblies
c) NFPA 252 – Fire Tests of Door Assemblies

6. UL – Underwriters Laboratories
a) UL10C – Positive Pressure Fire Tests of Door Assemblies. b) UL 305 – Panic Hardware

7. WHI – Warnock Hersey Incorporated State of California Building Code

8. Local applicable codes

9. SDI – Steel Door Institute

10. WI – Woodwork Institute

11. AWI – Architectural Woodwork Institute

12. NAAMM – National Association of Architectural Metal Manufacturers B. Abbreviations

1. Manufacturers: see table at 2.1.A of this section

2. Finishes: see 2.7 of this section.

Page 861 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -2

1.3 SUBMITTALS & SUBSTITUTIONS
A. SUBMITTALS: Submit six copies of schedule per D. Only submittals printed one sided will be accepted and reviewed. Organize vertically formatted schedule into “Hardware Sets” with index of doors and headings, indicating complete designations of every item required for each door or opening. Minimum 10pt font size. Include following information:

1. Type, style, function, size, quantity and finish of hardware items.

2. Use BHMA Finish codes per ANSI A156.18.

3. Name, part number and manufacturer of each item.

4. Fastenings and other pertinent information.

5. Location of hardware set coordinated with floor plans and door schedule.

6. Explanation of abbreviations, symbols, and codes contained in schedule.

7. Mounting locations for hardware.

8. Door and frame sizes, materials and degrees of swing.

9. List of manufacturers used and their nearest representative with address and phone number.

10. Catalog cuts.

11. Date of jobsite visit.

B. Bid and submit manufacturer’s updated/improved item if scheduled item is discontinued.

C. Deviations: Highlight, encircle or otherwise identify deviations from “Schedule of Finish Hardware” on submittal with notations clearly designating those portions as deviating from this section.

D. If discrepancy between drawings and scheduled material in this section, bid the more expensive of the two choices, note the discrepancy in the submittal and request direction from Architect for resolution.

E. Substitutions per Division 1. Include product data and indicate benefit to the Project.

Furnish operating samples on request.

F. Items listed with no substitute manufacturers have been requested by Owner to meet existing standard.

G. Furnish as-built/as-installed schedule with closeout documents, including keying schedule, riser and point-to-point wiring diagrams, manufacturers’ installation, adjustment and maintenance information, and supplier’s final inspection report.

1.4 QUALITY ASSURANCE:

A. Qualifications:

1. Hardware supplier: direct factory contract supplier who employs a hardware consultant, available at reasonable times during course of work for project hardware consultation to Owner, Architect and Contractor. a) Responsible for detailing, scheduling and ordering of finish hardware.

Detailing implies that the submitted schedule of hardware is correct and complete for the intended function and performance of the openings.

B. Hardware: Free of defects, blemishes and excessive play. Obtain each kind of hardware (latch and locksets, exit devices, hinges and closers) from one manufacturer.

Page 862 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -3
C. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort.

D. Fire-Rated Openings: NFPA 80 compliant. Hardware UL10C (positive pressure) compliant for given type/size opening and degree of label. Provide proper latching hardware, non-flaming door closers, approved-bearing hinges, and resilient seals.

Coordinate with wood door section for required intumescent seals. Furnish openings complete.

E. Furnish hardware items required to complete the work in accordance with specified performance level and design intent, complying with manufacturers’ instructions and code requirements.

F. Pre-Installation Meetings: Initiate and conduct with supplier, installer and related trades, coordinate materials and techniques, and sequence complex hardware items and systems installation. Include manufacturers' representatives of locks, panic hardware and door closers in the meetings. Convene prior to commencement of related work.

1.5 DELIVERY, STORAGE AND HANDLING:

A. Delivery: coordinate delivery to appropriate locations (shop or field).

1. Permanent keys and cores: secured delivery direct to Owner’s representative.

B. Acceptance at Site: Items individually packaged in manufacturers’ original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate contents, locations in hardware schedule and door numbers.

C. Storage: Provide securely locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, dust, excessive heat and cold, etc.

1.6 PROJECT CONDITIONS AND COORDINATION:

A. Electrified hardware: Electrical drawings and electrical specifications are based on the specific electrified hardware components specified in hardware sets. These electronic hardware components have been specified as an assembly. Changes to these components shall be submitted to the Architect for approval.

B. Where exact types of hardware specified are not adaptable to finished shape or size of members requiring hardware, provide suitable types having as nearly as practical the same operation and quality as type specified, subject to Architect’s approval.

C. Coordination: Coordinate hardware with other work. Furnish hardware items of proper design for use on doors and frames of the thickness, profile, swing, security and similar requirements indicated, as necessary for proper installation and function, regardless of omissions or conflicts in the information on the Contract Documents. Furnish related trades with the following information:

1. Location of embedded and attached items to concrete.

2. Location of wall-mounted hardware, including wall stops.

3. Location of finish floor materials and floor-mounted hardware.

Page 863 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -4

4. At masonry construction, coordinate with the anchoring and hollow metal supplier prior to frame installation by placing a strip of insulation, wood, or foam, on the back of the hollow metal frame behind the rabbet section for continuous hinges, as well as at rim panic hardware strike locations, silencers, coordinators, and door closer arm locations. When the frame is grouted in place, the backing will allow drilling and tapping without dulling or breaking the installer’s bits.

5. Locations for conduit and raceways as needed for electrical, electronic and electro-pneumatic hardware items. Fire/life-safety system interfacing. Point-topoint wiring diagrams plus riser diagrams to related trades.

6. Coordinate: flush top rails of doors at outswinging exteriors, and throughout where adhesive-mounted seals occur.

7. Manufacturers’ templates to door and frame fabricators.

D. Check Shop Drawings for doors and entrances to confirm that adequate provisions will be made for proper hardware installation.

E. Environmental considerations: segregate unused recyclable paper and paper product packaging, uninstalled metals, and plastics, and have these sent to a recycling center.

F. Prior to submittal, carefully inspect existing conditions to verify finish hardware required to complete Work, including sizes, quantities, existing hardware scheduled for re-use, and sill condition material. If conflict between the specified/scheduled hardware and existing conditions, submit request for direction from Architect. Include date of jobsite visit in the submittal.

1. Submittals prepared without thorough jobsite visit by qualified hardware expert will be rejected as non-compliant.

1.7 WARRANTY:

A. Part of respective manufacturers’ regular terms of sale. Provide manufacturers’ written warranties.

B. Include factory order numbers with close-out documents to validate warranty information, required for Owner in making future warranty claims:

C. Minimum warranties:

1. Locksets: Three years

2. Extra Heavy Duty Cylindrical Lock: Seven Years

3. Exit Devices: Three years mechanical

4. Closers: Thirty years mechanical

5. Hinges: One year

6. Other Hardware Two years

1.8 COMMISSIONING:

A. Conduct these tests prior to request for certificate of substantial completion:

1. With installer present, test door hardware operation with climate control system and stairwell pressurization system both at rest and while in full operation.

Page 864 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -5

2. With installer, access control contractor and electrical contractor present, test electrical, electronic and electro-pneumatic hardware systems for satisfactory operation.

3. With installer and electrical contractor present, test hardware interfaced with fire/life-safety system for proper operation and release.

1.9 REGULATORY REQUIREMENTS:

A. Locate latching hardware between 34 inches to 44 inches above the finished floor, per 2019 California Building Code, Section 11B-404.2.7.

1. Panic hardware: locate between 36 inches to 44 inches above the finished floor.

B. Handles, pull, latches, locks, other operable parts:

1. Readily openable from egress side with one hand and without tight grasping, tight pinching, or twisting of the wrist to operate. 2019 California Building Code Section 11B-309.4.

2. Force required to activate the operable parts: 5.0 pounds maximum, per 2019 California Building Code Section 11B-309.4.

C. Adjust doors to open with not more than 5.0-pounds pressure to open at exterior doors and 5.0-pounds at interior doors. As allowed per 2019 California Building Code Section 11B-404.2.9, local authority may increase the allowable pressure for fire doors to achieve positive latching, but not to exceed 15-pounds.

1. Exception: exterior doors’ pressure-to-open may be increased to 8.5-pounds if: at a single location, and one of a bank of eight leafs or fraction of eight, and one leaf of this bank is fitted with a low- or high-energy operator.

D. Low-energy powered doors: comply with ANSI/BHMA A156.19. Reference: 2019 California Building Code Section 11B-404.2.9.

1. Where powered door serves an occupancy of 100 or more, provide back-up battery power or stand-by generator power, capable of supporting a minimum of 100 cycles.

2. Actuators, vertical bar type: minimum 2-inches wide, 30-inches high, bottom located minimum 5-inches above floor or ground, top located minimum 35-inches above floor or ground. Displays International Symbol of Accessibility, per 2019 California Building Code Section 11B-703.7.

3. Actuators, plate type: use two at each side of the opening. Minimum 4-inches diameter or 4-inches square. Displays International Symbol of Accessibility, per 2019 California Building Code Section 11B-703.7. Locate centerline of lower plate between 7- and 8-inches above floor or ground, and upper plate between 30- and 44-inches above floor or ground.

4. Actuator location: conspicuously located, clear and level floor/ground space for forward or parallel approach.

E. Adjust door closer sweep periods so that from an open position of 90 degrees, the door will take at least 5 seconds to move to a point 12 degrees from the latch, measured to the landing side of the door, per 2019 California Building Code Section 11B-404.2.8.

1. Spring hinges: adjust for 1.5 seconds minimum for 70 degrees to fully-closed.

Page 865 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -6
F. Smooth surfaces at bottom 10 inches of push sides of doors, facilitating push-open with wheelchair footrests, per 2019 California Building Code Section 11B-404.2.10.

1. Applied kickplates and armor plates: bevel the left and right edges; free of sharp or abrasive edges.

2. Tempered glass doors without stiles: bottom rail may be less than 10 inches if top leading edge is tapered 60 degrees minimum.

G. Door opening clear width no less than 32 inches, measured from face of frame stop, or edge of inactive leaf of pair of doors, to door face with door opened to 90 degrees.

Hardware projection not a factor in clear width if located above 30 inches and below 80 inches, and the hardware projects no more than 4 inches. 2019 California Building Code Section 11B-404.2.3.

1. Exception: doors not requiring full passage through the opening, that is, to spaces less than 24 inches in depth, may have the clear opening width reduced to 20 inches. Example: shallow closets.

2. Door closers and overhead stops: not less than 78 inches above the finished floor or ground, per 2019 California Building Code 11B-307.4.

H. Thresholds: floor or landing no more than 0.50 inches below the top of the threshold of the doorway, per 2019 California Building Code Section 11B-404.2.5. Vertical rise no more than 0.25 inches, change in level between 0.25 inches and 0.50 inches: beveled to slope no greater than 1:2 (50 percent slope). 2019 California Building Code Section 11B-303.2 & ~.3.

I. Floor stops: Do not locate in path of travel. Locate no more than 4 inches from walls, per DSA Policy #99-08 (Access).

J. Pairs of doors with independently-activated hardware both leafs: limit swing of right-hand or right-hand-reverse leaf to 90 degrees to protect persons reading wall-mounted tactile signage, per 2019 California Building Code Section 11B-703.4.2.

K. Door and door hardware encroachment: when door is swung fully-open into means-ofegress path, the door may not encroach/project more than 7 inches into the required exit width, with the exception of door release hardware such as lockset levers or panic hardware. These hardware items must be located no less than 34-inches and no more than 48-inches above the floor/ground. 2019 California Building Code, Section 1005.7.1.

1. In I-2 occupancies, surface mounted latch release hardware, mounted to the side of the door facing away from the adjacent wall where the door I sin the open position, is not exempt from the inclusion in the 7-inch maximum encroachment, regardless of its mounting height, per 2019 California Building Code, Section 1005.7.1 at Exception 1.

Page 866 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -7
PART 2 - PRODUCTS

2.1 MANUFACTURERS:

A. Listed acceptable alternate manufacturers: these will be considered; submit for review products with equivalent function and features of scheduled products.

ITEM: MANUFACTURER: ACCEPTABLE ALTERNATE:

Hinges (IVE) Ives Stanley
Key System (SCH) Schlage As directed by Architect/Owner Mechanical Locks (SCH) Schlage As directed by Architect/Owner Exit Devices (VON) Von Duprin As directed by Architect/Owner Closers (LCN) LCN As directed by Architect/Owner
Auto Flush Bolts (IVE) Ives DCI
Coordinators (IVE) Ives DCI
Silencers (IVE) Ives Rockwood, Trimco
Push & Pull Plates (IVE) Ives Rockwood, Trimco
Kickplates (IVE) Ives Rockwood, Trimco
Stops & Holders (IVE) Ives Rockwood, Trimco
Overhead Stops (GLY) Glynn-Johnson ABH
Thresholds (ZER) Zero NGP, Pemko
Seals & Bottoms (ZER) Zero NGP, Pemko

2.2 HINGING METHODS:

A. Drawings typically depict doors at 90 degrees, doors will actually swing to maximum allowable. Use wide-throw conventional or continuous hinges as needed up to 8 inches in width to allow door to stand parallel to wall for true 180-degree opening. Advise architect if 8-inch width is insufficient.

B. Conform to manufacturer’s published hinge selection standard for door dimensions, weight and frequency, and to hinge selection as scheduled. Where manufacturer’s standard exceeds the scheduled product, furnish the heavier of the two choices, notify Architect of deviation from scheduled hardware.

C. Conventional Hinges: Steel or stainless steel pins and approved bearings. Hinge open widths minimum, but of sufficient throw to permit maximum door swing.

Page 867 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -8

1. Outswinging exterior doors: non-ferrous with non-removable (NRP) pins.

2. Non-ferrous material exteriors and at doors subject to corrosive atmospheric conditions.

2.3 LOCKSETS, LATCHSETS, DEADBOLTS:

A. Mortise Locksets and Latchsets: as scheduled.

1. Chassis: cold-rolled steel, handing field-changeable without disassembly.

2. Universal lock case – 10 functions in one case.

3. Floating mounting tabs automatically adjusts to fit a beveled door edge.

4. Latchbolts: 0.75 inch throw stainless steel anti-friction type.

5. Lever Trim: through-bolted, accessible design, cast lever or solid extruded bar type levers as scheduled. Filled hollow tube design unacceptable. a) Spindles: security design independent breakaway. Breakage of outside lever does not allow access to inside lever’s hubworks to gain wrongful entry.
b) Inside lever applied by screwless shank mounting – no exposed trim mount screws.
c) Levers rotate up or down for ease of use.
d) Vandalgard locks: locked lever freely rotates down while remaining securely locked. This feature prevents damage to internal lock components when subjected to excessive force.

6. Furnish solid cylinder collars with wave springs. Wall of collar to cover rim of mortise cylinder.

7. Turnpieces: accessible offset turn-lever design not requiring pinching or twisting motions to operate.

8. Deadbolts: stainless steel 1-inch throw.

9. Electric operation: Manufacturer-installed continuous duty solenoid.

10. Strikes: 16 gage curved steel, bronze or brass with 1 inch deep box construction, lips of sufficient length to clear trim and protect clothing.

11. Scheduled Lock Series and Design: Schlage L series, LONA design.

12. Certifications:
a) ANSI A156.13, Grade 1 Operational.
b) ANSI/ASTM F476-84 Grade 31 UL Listed.

13. Accessibility: Require not more than 5 lb to retract the latchbolt or deadbolt, or both, per CBC 2019 11B-404.2.7 and 11B-309.4.

2.4 EXIT DEVICES / PANIC HARDWARE
A. General features:

1. Independent lab-tested 1,000,000 cycles.

2. Push-through push-pad design. No exposed push-pad fasteners, no exposed cavities when operated. Return stroke fluid dampeners and rubber bottoming dampeners, plus anti-rattle devices.

3. Deadlocking latchbolts, 0.75 inch projection.

4. End caps: impact-resistant, flush-mounted. No raised edges or lips to catch carts or other equipment.

Page 868 of 2548 ends

CIP 689 – CLARK BUILDING RENOVATIONS
CITY OF HERMOSA BEACH PUBLIC WORKS DEPT.

DOOR HARDWARE
08 71 00 -9

5. No exposed screws to show through glass doors.

6. Non-handed basic device design with center case interchangeable with all functions, no extra parts required to effect change of function.

7. Releasable in normal operation with 15-pound maximum operating force per UBC Standard 10-4, and with 32-pound maximum pressure under 250-pound load to the door.

8. Exterior doors scheduled with XP-series devices: Static load force resistance of at least 2000 pounds.

9. Accessibility: Require not more than 5 lb to retract the latchbolt, per CBC 2019 11B-404.2.7 and 11B-309.4.
a) Mechanical method: Von Duprin “AX-“ feature, where touchpad directly retracts the latchbolt with 5 lb or less of force. Provide testing lab certification confirming that the mechanical device is independent thirdparty tested to meet this 5 lb requirement. b) Electrical method: Von Duprin’s “RX-QEL-“, where lightly pressing the touchpad with 5 lb or less of force closes an electric switch, activating quiet electric latch retraction.

B. Specific features:

1. Non-Fire Rated Devices: cylinder dogging.

2. Lever Trim: breakaway type, forged brass or bronze escutcheon min. 0.130 inch thickness, compression spring drive, match lockset lever design.

3. Rod and latch guards with sloped full-width kickplates for doors fitted with surface vertical rod devices with bottom latches.

4. Fire-Labeled Devices: UL label indicating “Fire Exit Hardware”. Vertical roddevices less bottom rod (LBR) unless otherwise scheduled.

5. Removable Mullions: Removable with single turn of building key. Securely reinstalled without need for key. Furnish storage brackets for securely stowing the mullion away from the door when removed.

6. Accepted substitutions: None, as directed by the Architect/Owner.

2.5 CLOSERS
C. Surface Closers: 4041XP

1. Full rack-and-pinion type cylinder with removable non-ferrous cover and cast iron body. Double heat-treated pinion shaft, single piece forged piston, chromesilicon steel spring.

2. ISO 2000 certified. Units stamped with date-of-manufacture code.

3. Independent lab-tested 10,000,000 cycles.

4. Non-sized, non-handed, and adjustable. Place closer inside building, stairs, and rooms.

5. Plates, brackets and special templating when needed for interface with particular header, door and wall conditions and neighboring hardware.

6. Adjust doors to open with not more than 5.0-pounds pressure to open at exterior doors and 5.0-pounds at interior doors. As allowed per 2016 California Building Code Section 11B-404.2.9, local authority may increase the allowable pressure for fire doors to achieve positive latching, but not to exceed 15-pounds.

Page 869 of 2548 ends
← All documents from this meeting