CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 22 0517 - 2

2.2 STACK-SLEEVE FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Smith, Jay R. Mfg. Co.

2. Zurn Specification Drainage Operation; Zurn Plumbing Products Group.

B. Description: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring, bolts, and nuts for membrane flashing.

1. Underdeck Clamp: Clamping ring with setscrews.

2.3 SLEEVE-SEAL SYSTEMS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Advance Products & Systems, Inc.

2. CALPICO, Inc.

3. Metraflex Company (The).

4. Pipeline Seal and Insulator, Inc.

5. Proco Products, Inc.

B. Description: Modular sealing-element unit, designed for field assembly, for filling annularspace between piping and sleeve.

1. Sealing Elements: EPDM-rubber or NBR interlocking links shaped to fit surface of pipe.

Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Carbon steel or stainless steel.

3. Connecting Bolts and Nuts: Carbon steel, with corrosion-resistant coating, or stainless steel of length required to secure pressure plates to sealing elements.

2.4 SLEEVE-SEAL FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Presealed Systems.

B. Description: Manufactured plastic, sleeve-type, waterstop assembly made for imbedding in concrete slab or wall. Unit has plastic or rubber waterstop collar with center opening to match piping OD.

2.5 GROUT
A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydrauliccement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength.

Page 1005 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 22 0517 - 3 D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION
A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1- inch (25-mm) annular clear space between piping and concrete slabs and walls.

C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.

1. Cutsleeves to length for mounting flush with both surfaces. a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches (50 mm) above finished floor level.

2. Using grout, seal the space outside of sleeves in slabs and walls without sleeve-seal system.

D. Install sleeves for pipes passing through interior partitions.

1. Cutsleeves to length for mounting flush with both surfaces.

2. Install sleeves that are large enough to provide 1/4-inch (6.4-mm) annular clear space between sleeve and pipe or pipe insulation.

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint. Comply with requirements for sealants specified in Section 079200 "Joint Sealants."
E. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestopping specified in Section 078413 "Penetration Firestopping."

3.2 STACK-SLEEVE-FITTING INSTALLATION
A. Install stack-sleeve fittings in new slabs as slabs are constructed.

1. Install fittings that are large enough to provide 1/4-inch (6.4-mm) annular clear space between sleeve and pipe or pipe insulation.

2. Secure flashing between clamping flanges for pipes penetrating floors with membrane waterproofing. Comply with requirements for flashing specified in Section 076200 "Sheet Metal Flashing and Trim."

3. Install section of cast-iron soil pipe to extend sleeve to 2 inches (50 mm) above finished floor level.

4. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.

5. Using grout, seal the space around outside of stack-sleeve fittings.

Page 1006 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 22 0517 - 4 B. Fire-Barrier Penetrations: Maintain indicated fire rating of floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestopping specified in Section 078413 "Penetration Firestopping."

3.3 SLEEVE-SEAL-SYSTEM INSTALLATION
A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.

B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.4 SLEEVE-SEAL-FITTINGINSTALLATION
A. Installsleeve-seal fittings in new walls and slabs asthey are constructed.

B. Assemble fitting components of length to be flush with both surfaces of concrete slabs and walls. Position waterstop flange to be centered in concrete slab or wall.

C. Secure nailing flangesto concrete forms.

D. Using grout, seal the space around outside of sleeve-seal fittings.

3.5 SLEEVE AND SLEEVE-SEAL SCHEDULE
A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Exterior Concrete Walls above Grade:
a. Piping Smaller Than [NPS 6 (DN 150)]: Cast-iron wall sleeves or galvanized-steel- pipe sleeves.
b. Piping NPS 6 (DN 150) and Larger: Cast-iron wall sleeves or galvanized-steel- pipe sleeves.

2. Exterior Concrete Walls below Grade:
a. Piping Smaller than NPS 6 (DN 150): Cast-iron wall sleeves with sleeve-seal system or galvanized-steel-pipe sleeves with sleeve-seal system. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.
b. Piping NPS 6 (DN 150) and Larger: Cast-iron wall sleeves with sleeve-seal system or galvanized-steel-pipe sleeves with sleeve-seal system. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.

3. Concrete Slabs-on-Grade:

Page 1007 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 22 0517 - 5 a. Piping Smaller than NPS 6 (DN 150): Cast-iron floor sleeves with sleeve-seal system, galvanized-steel-pipe sleeves with sleeve-seal system, or Sleeve-seal fittings. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.
b. Piping NPS 6 (DN 150) and Larger: Cast-iron floor sleeves with sleeve-seal system, galvanized-steel-pipe sleeves with sleeve-seal system, or galvanized- steel-pipe sleeves. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.

4. Concrete Slabs above Grade:
a. Piping Smaller Than NPS 6 (DN 150) : Galvanized-steel-pipe sleeves, stack- sleeve fittings, or Sleeve-seal fittings.
b. Piping NPS 6 (DN 150) and Larger: Galvanized-steel-pipe sleeves or stack-sleeve fittings.

5. Interior Partitions:
a. Piping Smaller Than NPS 6 (DN 150): Galvanized-steel-pipe sleeves. b. Piping NPS 6 (DN 150) and Larger: Galvanized-steel-sheetsleeves.

END OF SECTION 22 0517

Page 1008 of 2548 ends
Page 1009 of 2548 ends

CIB 689- Clark Building Renovations
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 0523 - 1
SECTION 22 0523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Bronze ball valves.

2. Bronze swing check valves.

3. Iron swing check valves.

4. Iron swing check valves with closure control.

5. Bronze globe valves.

6. Iron globe valves.

7. Chainwheels.

B. Related Sections:

1. Division 22 plumbing piping Sections for specialty valves applicable to those Sections only.

2. Division 22 Section "Identification for Plumbing Piping and Equipment" for valve tags and schedules.

3. Division 33 water distribution piping Sectionsfor general-duty and specialty valves for site construction piping.

1.3 SUBMITTALS
A. Product Data: For each type of valve indicated.

1.4 QUALITY ASSURANCE
A. ASME Compliance: ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

B. NSF Compliance: NSF 61 for valve materialsfor potable-water service.

C. To assure uniformity and compatibility, all grooved end valves and adjoining couplings shall be supplied by the same manufacturer.

Page 1010 of 2548 ends

CIB 689- Clark Building Renovations
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 0523 - 2
PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS FOR VALVES
A. Refer to valve schedule articlesfor applications of valves.

B. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

C. Valve Sizes: Same as upstream piping unless otherwise indicated.

D. Valve Actuator Types:

1. Gear Actuator: For quarter-turn valves NPS 8 and larger.

2. Handwheel: For valves other than quarter-turn types.

3. Handlever: For quarter-turn valves NPS 6 and smaller except plug valves.

4. Chainwheel: Device for attachment to valve handwheel, stem, or other actuator; of size and with chain for mounting height, as indicated in the "Valve Installation" Article.

E. Valvesin Insulated Piping: With 2-1/4 inch stem extensions and the following features:

1. Ball Valves: With extended operating handle of non-thermal-conductive material, and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation.

F. Valve-End Connections:

1. Flanged: With flanges according to ASME B16.1 for iron valves.

2. SolderJoint: With sockets according to ASME B16.18.

3. Threaded: With threads according to ASME B1.20.1.

4. Grooved: With grooves according to ANSI/AWWA C606.

2.2 BRONZE BALL VALVES
A. Two-Piece, Full-Port, Ball Valves with Stainless-Steel Trim:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc. (Apollo)

2. Description:
a. Standard: MSS SP-110.
b. SWP Rating: 150 psig.
c. CWP Rating: 600 psig.
d. Body Design: Two piece.
e. Body Material: Bronze.
f. Ends: Threaded.
g. Seats: PTFE or TFE.
h. Stem: 316 Stainless Steel.
i. Ball: 316 Stainless Steel.
j. Port: Full.

Page 1011 of 2548 ends

CIB 689- Clark Building Renovations
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 0523 - 3

2.3 BRONZE SWING CHECK VALVES
A. Class 125, Bronze Swing Check Valves with Bronze Disc:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc. (Apollo)

2. Description:
a. Standard: MSS SP-80, Type 3.
b. CWP Rating: 200 psig.
c. Body Design: Horizontal flow.
d. Body Material: ASTM B 62, bronze.
e. Ends: Threaded.
f. Disc: Bronze.

2.4 IRON SWING CHECK VALVES
A. Class 125, Iron Swing Check Valves with Metal Seats:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc. (Apollo)

2. Description:
a. Standard: MSS SP-71, Type I.
b. CWP Rating: 200 psig.
c. Body Design: Clear or full waterway.
d. Body Material: ASTM A 126, gray iron with bolted bonnet. e. Ends: Flanged.
f. Trim: Bronze.
g. Gasket: Asbestosfree.

2.5 IRON SWING CHECK VALVES WITH CLOSURE CONTROL
A. Class 125, Iron Swing Check Valves with Lever- and Spring-Closure Control:

1. Description:
a. Standard: MSS SP-71, Type I.
b. CWP Rating: 200 psig.
c. Body Design: Clear or full waterway.
d. Body Material: ASTM A 126, gray iron with bolted bonnet. e. Ends: Flanged.
f. Trim: Bronze.
g. Gasket: Asbestosfree.
h. Closure Control: Factory-installed, exterior lever and spring.

Page 1012 of 2548 ends

CIB 689- Clark Building Renovations
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 0523 - 4

2.6 BRONZE GLOBE VALVES
A. Class 125, Bronze Globe Valves with Bronze Disc:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc. (Apollo)

2. Description:
a. Standard: MSS SP-80, Type 1.
b. CWP Rating: 200 psig.
c. Body Material: ASTM B 62, bronze with integralseat and screw-in bonnet. d. Ends: Threaded or solder joint.
e. Stem and Disc: Bronze.
f. Packing: Asbestosfree.
g. Handwheel: Malleable iron.

2.7 IRON GLOBE VALVES
A. Class 125, Iron Globe Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc. (Apollo)

2. Description:
a. Standard: MSS SP-85, Type I.
b. CWP Rating: 200 psig.
c. Body Material: ASTM A 126, gray iron with bolted bonnet. d. Ends: Flanged.
e. Trim: Bronze.
f. Packing and Gasket: Asbestos free.

2.8 CHAINWHEELS
A. Description: Valve actuation assembly with sprocket rim, brackets, and chain.

1. Brackets: Type, number, size, and fastenersrequired to mount actuator on valve.

2. Sprocket Rim with Chain Guides: Ductile iron, of type and size required for valve. Include zinc coating.

3. Chain: Hot-dip, galvanized steel, of size required to fitsprocket rim.

Page 1013 of 2548 ends

CIB 689- Clark Building Renovations
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 0523 - 5
PART 3 - EXECUTION

3.1 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valvesin horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow fullstem movement.

E. Install swing check valves for proper direction of flow and in horizontal position with hinge pin level.

F. Install grooved end valves in accordance with the manufacturer's guidelines and recommendations. A representative shall provide on-site training for contractor's field personnel in the installation of grooved end valves. Factory-trained representative shall periodically review the product installation. Contractor shall remove and replace any improperly installed products.

3.2 ADJUSTING
A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valve applications are not indicated, use the following:

1. Shutoff Service: Ball valves.

2. Throttling Service: Globe or ball valves.

3. Pump-Discharge Check Valves:
a. NPS 2 and Smaller: Bronze swing check valves with bronze or nonmetallic disc. b. NPS 2-1/2 and Larger for Domestic Water: Iron swing check valves with lever and weight or with spring.
c. NPS 2-1/2 and Larger for Sanitary Waste and Storm Drainage: Iron swing check valves with lever and weight or spring.

B. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP class or CWP ratings may be substituted.

C. Select valves, except wafer types, with the following end connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve- end option is indicated in valve schedules below.

2. For Copper Tubing, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve- end option is indicated in valve schedules below.

3. For Steel Piping, NPS 2 and Smaller: Threaded ends.

Page 1014 of 2548 ends

CIB 689- Clark Building Renovations
GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 0523 - 6

4. For Steel Piping, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.

3.4 DOMESTIC, HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller:

1. Bronze Valves: May be provided with solder-joint endsinstead of threaded ends.

2. Bronze Angle Valves: Class 125, bronze disc.

3. Ball Valves: Two piece, full port, 316 stainless steel with bronze trim.

4. Bronze Swing Check Valves: Class 125, bronze disc.

5. Bronze Globe Valves: Class 125, bronze disc.

B. Pipe NPS 2-1/2 and Larger:

1. Iron Valves, NPS 2-1/2 to NPS 4: May be provided with threaded ends instead of flanged ends.

2. Iron Swing Check Valves: Class 125, metalseats.

3. Iron Swing Check Valves with Closure Control: Class 125, lever and spring.

4. Iron Globe Valves: Class 125.

END OF SECTION 22 0523

Page 1015 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 1 SECTION 22 0529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Metal framing systems.

4. Thermal-hanger shield inserts.

5. Fastenersystems.

6. Pipe stands.

7. Pipe positioning systems.

8. Equipment supports.

B. Related Sections:

1. Section 055000 "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.

2. Section 220516 "Expansion Fittings and Loops for Plumbing Piping" for pipe guides and anchors.

3. Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment" for vibration isolation devices.

1.3 DEFINITIONS
A. MSS: Manufacturers Standardization Society of The Valve and FittingsIndustry Inc.

1.4 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design trapeze pipe hangers and equipment supports, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

B. Structural Performance: Hangers and supports for plumbing piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI

7. 1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.

Page 1016 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 2

2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.

1.5 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.

B. Shop Drawings: Show fabrication and installation details and include calculations for the following; include Product Data for components:

1. Trapeze pipe hangers.

2. Metal framing systems.

3. Pipe stands.

4. Equipment supports.

C. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1. Detail fabrication and assembly of trapeze hangers.

2. Design Calculations: Calculate requirements for designing trapeze hangers.

1.6 INFORMATIONAL SUBMITTALS
A. Welding certificates.

1.7 QUALITY ASSURANCE
A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.

2. Galvanized Metallic Coatings: Pre-galvanized or hot dipped.

3. Nonmetallic Coatings: Plastic coating, jacket, or liner.

4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

B. Stainless-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.

Page 1017 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 3

2. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.

3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainlesssteel.

C. Copper Pipe Hangers:

1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel or stainless steel.

2.2 TRAPEZE PIPE HANGERS
A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U- bolts.

2.3 METAL FRAMING SYSTEMS
A. MFMA Manufacturer Metal Framing Systems:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Allied Tube & Conduit.
b. Cooper B-Line, Inc.
c. Powerstrut
d. Unistrut Corporation; Tyco International, Ltd.

2. Description: Shop- or field-fabricated pipe-support assembly for supporting multiple parallel pipes.

3. Standard: MFMA-4.

4. Channels: Continuousslotted steel channel with inturned lips.

5. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.

6. Hanger Rods: Continuous-thread rod, nuts, and washers made of carbon steel.

7. Metallic Coating: Electroplated zinc or mill galvanized.

2.4 THERMAL-HANGER SHIELD INSERTS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Carpenter & Paterson, Inc.

2. Clement Support Services.

3. ERICO International Corporation.

4. National Pipe Hanger Corporation.

5. PHS Industries, Inc.

6. Pipe Shields, Inc.; a subsidiary of Piping Technology & Products, Inc.

7. Piping Technology & Products, Inc.

8. Rilco Manufacturing Co., Inc.

9. Value Engineered Products, Inc.

Page 1018 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 4 B. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig (688- kPa) or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig (862-kPa) minimum compressive strength and vapor barrier.

C. Insulation-Insert Material for Hot Piping: Water-repellent treated, ASTM C 533, Type I calcium silicate with 100-psig (688-kPa), ASTM C 552, Type II cellular glass with 100-psig (688-kPa), or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig (862-kPa) minimum compressive strength.

D. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.

E. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

F. Insert Length: Extend 2 inches (50 mm) beyond sheet metal shield for piping operating below ambient air temperature.

2.5 FASTENER SYSTEMS
A. Mechanical-Expansion Anchors: Insert-wedge-type, zinc-coated steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

2.6 PIPE STANDS
A. General Requirements for Pipe Stands: Shop- or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping.

B. Compact Pipe Stand: One-piece plastic unit with integral-rod roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration.

C. Low-Type, Single-Pipe Stand: One-piece stainless-steel base unit with plastic roller, for roof installation without membrane penetration.

D. High-Type, Single-Pipe Stand:

1. Description: Assembly of base, vertical and horizontal members, and pipe support, for roof installation without membrane penetration.

2. Base: Stainless steel.

3. Vertical Members: Two or more cadmium-plated-steel or stainless-steel, continuous- thread rods.

4. Horizontal Member: Cadmium-plated-steel or stainless-steel rod with plastic or stainless- steel, roller-type pipe support.

E. High-Type, Multiple-Pipe Stand:

1. Description: Assembly of bases, vertical and horizontal members, and pipe supports, for roof installation without membrane penetration.

2. Bases: One or more; plastic.

3. Vertical Members: Two or more protective-coated-steel channels.

4. Horizontal Member: Protective-coated-steel channel.

5. Pipe Supports: Galvanized-steel, clevis-type pipe hangers.

Page 1019 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 5 F. Curb-Mounting-Type Pipe Stands: Shop- or field-fabricated pipe supports made from structural- steel shapes, continuous-thread rods, and rollers, for mounting on permanent stationary roof curb.

2.7 PIPE POSITIONING SYSTEMS
A. Description: IAPMO PS 42, positioning system of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.

2.8 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon- steel shapes.

2.9 MISCELLANEOUSMATERIALS
A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.

B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.

1. Properties: Nonstaining, noncorrosive, and nongaseous.

2. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength.

PART 3 - EXECUTION

3.1 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.

2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported.

Weld steel according to AWS D1.1/D1.1M.

C. Metal Framing System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled metal framing systems.

D. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.

E. Fastener System Installation:

Page 1020 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 6

1. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured.

Install fasteners according to manufacturer's written instructions.

F. Pipe Stand Installation:

1. Pipe Stand Types except Curb-Mounted Type: Assemble components and mount on smooth roof surface. Do not penetrate roof membrane.

2. Curb-Mounted-Type Pipe Stands: Assemble components or fabricate pipe stand and mount on permanent, stationary roof curb. See Section 077200 "Roof Accessories" for curbs.

G. Pipe Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.

H. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

I. Equipment Support Installation: Fabricate from welded-structural-steel shapes.

J. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

K. Install lateral bracing with pipe hangers and supports to prevent swaying.

L. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 (DN 65) and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.

M. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

N. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

O. Insulated Piping:

1. Attach clamps and spacersto piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated.

Fill interior voids with insulation that matches adjoining insulation. a. Option: Thermal-hanger shield inserts may be used. Include steel weightdistribution plate for pipe NPS 4 (DN 100) and larger if pipe is installed on rollers.

Page 1021 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 7

3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
a. Option: Thermal-hanger shield inserts may be used. Include steel weightdistribution plate for pipe NPS 4 (DN 100) and larger if pipe is installed on rollers.

4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2 (DN 8 to DN 90): 12 inches (305 mm) long and 0.048 inch (1.22 mm) thick.
b. NPS 4 (DN 100): 12 inches (305 mm) long and 0.06 inch (1.52 mm) thick. c. NPS 5 and NPS 6 (DN 125 and DN 150): 18 inches (457 mm) long and 0.06 inch (1.52 mm) thick.
d. NPS 8 to NPS 14 (DN 200 to DN 350): 24 inches (610 mm) long and 0.075 inch (1.91 mm) thick.
e. NPS 16 to NPS 24 (DN 400 to DN 600): 24 inches (610 mm) long and 0.105 inch (2.67 mm) thick.

5. Pipes NPS 8 (DN 200) and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.

6. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.

3.2 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.

B. Grouting: Place grout under supportsfor equipment and make bearing surface smooth.

C. Provide lateral bracing, to prevent swaying, for equipment supports.

3.3 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.

B. Fit exposed connectionstogether to form hairline joints. Field weld connectionsthat cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work; and with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.

Page 1022 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 8

3.4 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excesslength of continuous-thread hanger and support rodsto 1-1/2 inches(40 mm).

3.5 PAINTING
A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC- PA 1 requirements for touching up field-painted surfaces.

1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils (0.05 mm).

B. Touchup: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal are specified in applicable Division 9 section(s).

C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.

3.6 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports, metal trapeze pipe hangers, and metal framing systems and attachments for general service applications.

F. Use stainless-steel pipe hangers and stainless-steel attachments for hostile environment applications.

G. Use copper-plated pipe hangers and copper or stainless-steel attachments for copper piping and tubing.

H. Use padded hangersfor piping that issubject to scratching.

I. Use thermal-hanger shield inserts for insulated piping and tubing.

J. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

Page 1023 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 9

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of non-insulated or insulated, stationary pipes NPS 1/2 to NPS 30 (DN 15 to DN 750).

2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F (566 deg C), pipes NPS 4 to NPS 24 (DN 100 to DN 600), requiring up to 4 inches (100 mm) of insulation.

3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36 (DN 20 to DN 900), requiring clamp flexibility and up to 4 inches(100 mm) of insulation.

4. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to NPS 24 (DN 15 to DN 600) if little or no insulation is required.

5. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4 (DN 15 to DN 100), to allow off-center closure for hanger installation before pipe erection.

6. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of noninsulated, stationary pipes NPS 3/4 to NPS 8 (DN 20 to DN 200).

7. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).

8. Adjustable Band Hangers (MSS Type 9): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).

9. Adjustable, Swivel-Ring Band Hangers(MSS Type 10): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).

10. Split Pipe Ring with or without Turnbuckle Hangers (MSS Type 11): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 8 (DN 10 to DN 200).

11. Extension Hinged or Two-Bolt Split Pipe Clamps (MSS Type 12): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 3 (DN 10 to DN 80).

12. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30 (DN 15 to DN 750).

13. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.

14. Pipe Saddle Supports (MSS Type 36): For support of pipes NPS 4 to NPS 36 (DN 100 to DN 900), with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate.

15. Pipe Stanchion Saddles (MSS Type 37): For support of pipes NPS 4 to NPS 36 (DN 100 to DN 900), with steel-pipe base stanchion support and cast-iron floor flange or carbon- steel plate, and with U-bolt to retain pipe.

16. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes NPS 2- 1/2 to NPS 36 (DN 65 to DN 900) if vertical adjustment is required, with steel-pipe base stanchion support and cast-iron floor flange.

17. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30 (DN 25 to DN 750), from two rods if longitudinal movement caused by expansion and contraction might occur.

18. Adjustable Roller Hangers (MSS Type 43): For suspension of pipes NPS 2-1/2 to NPS 24 (DN 65 to DN 600), from single rod if horizontal movement caused by expansion and contraction might occur.

19. Complete Pipe Rolls (MSS Type 44): For support of pipes NPS 2 to NPS 42 (DN 50 to DN 1050) if longitudinal movement caused by expansion and contraction might occur but vertical adjustment is not necessary.

20. Pipe Roll and Plate Units (MSS Type 45): For support of pipes NPS 2 to NPS 24 (DN 50 to DN 600) if small horizontal movement caused by expansion and contraction might occur and vertical adjustment is not necessary.

21. Adjustable Pipe Roll and Base Units (MSS Type 46): For support of pipes NPS 2 to NPS 30 (DN 50 to DN 750) if vertical and lateral adjustment during installation might be required in addition to expansion and contraction.

Page 1024 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 10 K. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to NPS 24 (DN 24 to DN 600).

2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 (DN 20 to DN 600) if longer ends are required for riser clamps.

L. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches (150 mm) for heavy loads.

2. Steel Clevises (MSS Type 14): For 120 to 450 deg F (49 to 232 deg C) piping installations.

3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.

4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.

5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F (49 to 232 deg C) piping installations.

M. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.

2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.

3. Side-Beam or Channel Clamps(MSS Type 20): For attaching to bottom flange of beams, channels, or angles.

4. Center-Beam Clamps(MSS Type 21): For attaching to center of bottom flange of beams.

5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.

6. C-Clamps(MSS Type 23): For structuralshapes.

7. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.

8. Side-Beam Clamps(MSS Type 27): For bottom of steel I-beams.

9. Steel-Beam Clamps with Eye Nuts (MSS Type 28): For attaching to bottom of steel I- beams for heavy loads.

10. Linked-Steel Clamps with Eye Nuts (MSS Type 29): For attaching to bottom of steel I- beams for heavy loads, with link extensions.

11. Malleable-Beam Clamps with Extension Pieces (MSS Type 30): For attaching to structuralsteel.

12. Welded-Steel Brackets: For support of pipes from below or for suspending from above by using clip and rod. Use one of the following for indicated loads:
a. Light (MSS Type 31): 750 lb (340 kg).
b. Medium (MSS Type 32): 1500 lb (680 kg).
c. Heavy (MSS Type 33): 3000 lb (1360 kg).

13. Side-Beam Brackets(MSS Type 34): For sides of steel or wooden beams.

14. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required.

15. Horizontal Travelers (MSS Type 58): For supporting piping systems subject to linear horizontal movement where headroom is limited.

Page 1025 of 2548 ends

CIB 689- Clark Building Renovations
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 0529 - 11 N. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.

2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.

3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.

O. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Restraint-Control Devices(MSS Type 47): Where indicated to control piping movement.

2. Spring Cushions(MSS Type 48): For light loadsif vertical movement does not exceed 1- 1/4 inches (32 mm).

3. Spring-Cushion Roll Hangers (MSS Type 49): For equipping Type 41, roll hanger with springs.

4. Spring Sway Braces (MSS Type 50): To retard sway, shock, vibration, or thermal expansion in piping systems.

5. Variable-Spring Hangers (MSS Type 51): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from hanger.

6. Variable-Spring Base Supports (MSS Type 52): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from base support.

7. Variable-Spring Trapeze Hangers (MSS Type 53): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from trapeze support.

8. Constant Supports: For critical piping stress and if necessary to avoid transfer of stress from one support to another support, critical terminal, or connected equipment. Include auxiliary stops for erection, hydrostatic test, and load-adjustment capability. These supports include the following types:
a. Horizontal (MSS Type 54): Mounted horizontally.
b. Vertical (MSS Type 55): Mounted vertically.
c. Trapeze (MSS Type 56): Two vertical-type supports and one trapeze member.

P. Comply with MSS SP-69 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.

Q. Comply with MFMA-103 for metal framing system selections and applications that are not specified in piping system Sections.

R. Use mechanical-expansion anchors instead of building attachments where required in concrete construction.

S. Use pipe positioning systems in pipe spaces behind plumbing fixtures to support supply and waste piping for plumbing fixtures.

END OF SECTION 22 0529

Page 1026 of 2548 ends
Page 1027 of 2548 ends

CIB 689- Clark Building Renovations
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0553 - 1 SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Equipment labels.

2. Pipe labels.

3. Valve tags.

4. Warning tags.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

C. Equipment Label Schedule: Include a listing of all equipment to be labeled with the proposed content for each label.

D. Valve numbering scheme.

E. Valve Schedules: For each piping system to include in maintenance manuals.

1.4 COORDINATION
A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

1.5 WORK INCLUDED
A. Furnish and install nameplates, valve tags, valve charts, and pipe markers on all Plumbing equipment, and piping.

B. Provide nameplates with the unit number and service designation on all plumbing equipment.

Page 1028 of 2548 ends

CIB 689- Clark Building Renovations
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0553 - 2 C. Indicate all valve tag numbers on Record Drawings and submit framed under glass valve tag charts including valve service and location.

D. Install color coded ceiling tacks in acoustical tile ceilings or color coded tape on ceiling grid to identify location of equipment, valves and dampers that require regular maintenance or are part of a life safety system (fire dampers, smoke dampers, sprinkler valves or main isolation valves). Concealed fire protection valves shall be marked by red label triangles (3" equilateral) and circle dots (1" diameter). Triangles shall be placed on the wall nearest the valve with the apex pointing toward the ceiling tile. Dots shall be placed on border of ceiling tile.

E. Provide underground plastic pipe markers 6 to 8 inches below finish grade, directly above buried pipes.

F. Prepare valve charts and frame under glass. All valves and the tag numbers shall be shown on the Record As-Built Drawings.

G. Provide valve computer data base to match chart.

H. Prepare and install exterior protected brass plaques indicating underground service entrances.

PART 2 - PRODUCTS

2.1 GENERAL
A. Acceptable manufactures contingent on compliance with the specification.

1. Seton

2. Brady Corporation

3. Marking ServicesIncorporated

2.2 EQUIPMENT NAMEPLATES
A. Equipment nameplates shall be 3” x 6” long, 0.02” aluminum with a black enamel background with engraved natural aluminum letters similar to Seton Style 2065-20. Nameplate shall have pressure sensitive taped backing.

B. The nameplate shall contain the unit or equipment designation (“AHU” for air handling unit, “P” for circulating pump, etc.), unit number and area or system served.

C. Nameplates for exterior equipment shall be applied with waterproof adhesive.

2.3 PIPE IDENTIFICATION AND VALVE TAGS
A. All piping, except that piping which is within inaccessible chases, shall be identified with semi- rigid plastic identification markers equal to Seton Setmark pipe markers.

1. Direction of flow arrows are to be included on each marker.

2. Each marker background shall be appropriately color coded with a clearly printed legend to identify the contents of the pipe in conformance with the “Scheme for the Identification of Piping Systems” (ASME A13.1-1981).

Page 1029 of 2548 ends

CIB 689- Clark Building Renovations
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0553 - 3

3. Setmark snap-around markers shall be used for overall diameters up to 6” and strap- around markers shall be used above 6” overall diameters.

4. Markersshall be located:
a. Adjacent to each valve
b. At each branch
c. At each cap for future
d. At each riser takeoff,
e. At each pipe passage through wall (each side)
f. At each pipe passage at 20’ – 0” intervals maximum.
g. At each piece of equipment.
h. At all access doors.
i. A minimum of one (1) marker shall be provided at each room.

5. Under ground pipe markers:
a. Provide detectable tape on all underground piping:
b. Labels shall be color coded and labeled the same as indoors.

B. Valve tags

1. All valves shall be designated by distinguishing numbers and letters carefully coordinated with a valve chart. Valve tags shall include what room(s) the valve serves and piece of equipmentserved.

2. Valve tags shall be color coded 0.032” anodized aluminum tags, with engraved letters similar to Seton S Type 250-BL or approved equal.
a. HVAC tags shall be round 2” diameter, similar to Seton 15426. b. Plumbing tags shall be square 2” x 2” similar to Seton 42769. c. Fire Protection tags shall be square 2” x 2” similar to Seton 42769 RED. d. Lettering shall be ¼” high for type service and ½” for valve number. Tag shall indicate service and valve number.
e. Each service shall be a different color.

3. Tag shall be attached to valves with chain similar to Seton No 16 stainless steel jack chain.

4. Whenever a valve is above a hung ceiling, the valve tag shall be located immediately above the hung ceiling.

5. Provide a tag for every valve except:
a. Perimeter radiation shut-off valves that are located at the finned tube radiation element within the accessible (from the space) heating enclosure C. Furnish a minimum of two (2) typed valve lists

1. Each framed under glass or Plexiglas. Each chart shall be enclosed in an approved 0.015” thick plastic closure for permanent protection.

2. Valve numbers shall correspond to those indicated on the Record Drawings and on the printed valve lists.

3. The printed listshall include the valve number, location and purpose of each valve.

4. It shall state other necessary information such as the required opening or closing of another valve when one valve is to be opened or closed.

5. Printed framed valve lists shall be displayed in each Mechanical Room or in a location designated by Northwestern University.

Page 1030 of 2548 ends

CIB 689- Clark Building Renovations
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0553 - 4 D. Valve data base.

1. Provide a valve data base for all valves to operate on the building computer.

2. Every valve shall include:
a. Tag Number
b. Service (Hot water, Chilled water, Sprinkler, etc.)
c. Size
d. Operation
e. Location
f. Manufacture
g. Model number
h. Submittal reference

2.4 UTILITY ENTRANCE DESIGNATIONS
A. Provide a brass wall plaque, minimum 0.020” thickness, secured to the exterior wall just above the grade line for all buried service entrances or exits. Samples are: Water Service Below; Gas Service Below; Sanitary Sewer Below; Storm Sewer Below; Irrigation Water Below; etc.

B. Ceiling Tacks or Tape.

C. Provide steel color coded 3/4 inch diameter ceiling tacks in acoustical tile ceilings or color coded tape applied to ceiling grid to locate equipment, valves or dampers that require regular maintenance or are part of a Life Safety System.

D. The tacks or tapes shall be color codes as follows:

1. Yellow – HVAC

2. Red – Life Safety (fire dampers, sprinkler valves, etc.)

3. Green - Plumbing Valves.

4. Blue – Heating/Cooling Valves.

PART 3 - EXECUTION

3.1 PREPARATION
A. Allsurfacesshall be cleaned and insulated (if applicable) prior to installing any identification.

B. Exterior surfaces of outdoor equipment shall be dry and prepared to accept the specified identification.

3.2 INSTALLATION
A. Install nameplates with corrosive-resistant mechanical fasteners, or adhesive. Apply with sufficient adhesive to ensure permanent adhesion. Seal with clear lacquer.

B. Install valve tags with chain.

C. Install plastic pipe markers in accordance with manufacturer’s Instructions.

Page 1031 of 2548 ends

CIB 689- Clark Building Renovations
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0553 - 5 D. Install plastic tape markers complete around pipe in accordance with manufacturer’s instructions.

E. Install underground plastic pipe markers 6 to 8 inches below finished grade, directly above buried pipe.

F. Identify air handling units, pumps, domestic hot water heaters, fire pumps, heat transfer equipment tanks, water treatment devices, etc. with plastic nameplates. Small devices, such as in-line pumps, may be identified with tags.

G. Identify control panels and major control components outside panels with plastic nameplates.

H. Install detector tape on all under ground services in accordance with the manufactures recommendations.

I. Identify thermostats relating to air handling equipment serving multiple spaces.

J. Identify valves in main and branch piping with valve tags.

K. Tag automatic controls, instruments and relays. Key to controlschematic.

L. Identify piping, concealed or exposed, with pipe markers or where buried using plastic tape pipe markers.

Use tags on piping ¾ inch diameter and smaller. Identify service, flow direction and pressure. Install in clear view and align with axis of piping. Locate identification not to exceed 20 feet on straight runs including risers and drops, adjacent to each valve and Tee, at each side of penetration of structure or enclosure, and at each obstruction.

END OF SECTION 22 0553

Page 1032 of 2548 ends
Page 1033 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 1
SECTION 220700 - PLUMBING INSULATION
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Insulation Materials:
a. Flexible elastomeric.
b. Mineral fiber.
c. Polyolefin.

2. Insulating cements.

3. Adhesives.

4. Mastics.

5. Sealants.

6. Factory-applied jackets.

7. Field-applied fabric-reinforcing mesh.

8. Field-applied jackets.

9. Tapes.

10. Securements.

11. Corner angles.

B. Related Sections include the following:

1. Division 23 Section "HVAC Insulation."

1.3 SUBMITTALS
A. Product Data: For each type of product indicated.

B. LEED Submittal:

1. Product Data for Credit EQ 4.1: For adhesives and sealants, including printed statement of VOC content.

C. Shop Drawings:

1. Detail application of protective shields, saddles, and inserts at hangers for each type of insulation and hanger.

2. Detail attachment and covering of heat tracing inside insulation.

Page 1034 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 2

3. Detail insulation application at pipe expansion joints for each type of insulation.

4. Detail insulation application at elbows, fittings, flanges, valves, and specialties for each type of insulation.

5. Detail removable insulation at piping specialties, equipment connections, and access panels.

6. Detail application of field-applied jackets.

7. Detail application at linkages of control devices.

8. Detail field application for each equipment type.

D. Field quality-control reports.

1.4 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Insulation and related materials shall have fire-test- response characteristics indicated, as determined by testing identical products per ASTM E 84, by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with appropriate markings of applicable testing and inspecting agency.

1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.

2. Insulation Installed Outdoors: Flame-spread index of 75 or less, and smoke-developed index of 150 or less.

PART 2 - PRODUCTS

2.1 INSULATION MATERIALS
A. Comply with requirements in Part 3 schedule articles for where insulating materials shall be applied.

B. Products shall not contain asbestos, lead, mercury, or mercury compounds.

C. Products that come in contact with stainless steel shall have a leachable chloride content of less than 50 ppm when tested according to ASTM C 871.

D. Insulation materials for use on austenitic stainless steel shall be qualified as acceptable according to ASTM C 795.

E. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process.

F. Flexible Elastomeric: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type I for tubular materials and Type II for sheet materials.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Aeroflex USA Inc.; Aerocel.
b. Armacell LLC; AP Armaflex.
c. RBX Corporation; Insul-Sheet 1800 and Insul-Tube 180.

Page 1035 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 3
G. Mineral-Fiber, Preformed Pipe Insulation:

1. Products: Subject to compliance with requirements, provide one of the following:
a. Johns Manville; Micro-Lok.
b. Knauf Insulation; 1000 Pipe Insulation.
c. Owens Corning; Fiberglas Pipe Insulation.

2. Type I, 850 deg F Materials: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 547, Type I, Grade A, with factory-applied ASJ. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

H. Polyolefin: Unicellular, polyethylene thermal plastic insulation. Comply with ASTM C 534 or ASTM C 1427, Type I, Grade 1 for tubular materials and Type II, Grade 1 for sheet materials.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Armacell LLC; Tubolit.
b. Nomaco Inc.; IMCOLOCK, IMCOSHEET, NOMALOCK, and NOMAPLY. c. RBX Corporation; Therma-cell.

2.2 INSULATING CEMENTS
A. Mineral-Fiber, Hydraulic-Setting Insulating and Finishing Cement: Comply with ASTM C 449/C 449M.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Insulco, Division of MFS, Inc.; SmoothKote.
b. P. K. Insulation Mfg. Co., Inc.; PK No. 127, and Quik-Cote. c. Rock Wool Manufacturing Company; Delta One Shot.

2.3 ADHESIVES
A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated, unless otherwise indicated.

B. Flexible Elastomeric and Polyolefin Adhesive: Comply with MIL-A-24179A, Type II, ClassI.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Aeroflex USA Inc.; Aeroseal.
b. Armacell LCC; 520 Adhesive.
c. Foster Products Corporation, H. B. Fuller Company; 85-75. d. RBX Corporation; Rubatex Contact Adhesive.

2. For indoor applications, use adhesive that has a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

C. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A.

1. Products: Subject to compliance with requirements, provide one of the following:

Page 1036 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 4
a. Childers Products, Division of ITW; CP-82.
b. Foster Products Corporation, H. B. Fuller Company; 85-20. c. ITW TACC, Division of Illinois Tool Works; S-90/80.
d. Marathon Industries, Inc.; 225.
e. Mon-Eco Industries, Inc.; 22-25.

2. For indoor applications, use adhesive that has a VOC content of 80 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

D. ASJ Adhesive, and FSK and PVDC Jacket Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; CP-82.
b. Foster Products Corporation, H. B. Fuller Company; 85-20. c. ITW TACC, Division of Illinois Tool Works; S-90/80.
d. Marathon Industries, Inc.; 225.
e. Mon-Eco Industries, Inc.; 22-25.

2. For indoor applications, use adhesive that has a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

E. PVC Jacket Adhesive: Compatible with PVC jacket.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Dow Chemical Company (The); 739, Dow Silicone.
b. Johns-Manville; Zeston Perma-Weld, CEEL-TITE Solvent Welding Adhesive. c. P.I.C. Plastics, Inc.; Welding Adhesive.
d. Speedline Corporation; Speedline Vinyl Adhesive.

2. For indoor applications, use adhesive that has a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

2.4 MASTICS
A. Materials shall be compatible with insulation materials, jackets, and substrates; comply with MIL-C19565C, Type II.

1. For indoor applications, use mastics that have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

B. Vapor-Barrier Mastic: Water based; suitable for indoor and outdoor use on below ambient services.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; CP-35.
b. Foster Products Corporation, H. B. Fuller Company; 30-90. c. ITW TACC, Division of Illinois Tool Works; CB-50.
d. Marathon Industries, Inc.; 590.
e. Mon-Eco Industries, Inc.; 55-40.

Page 1037 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 5

2. Water-Vapor Permeance: ASTM E 96, Procedure B, 0.013 perm at 43-mil dry film thickness.

3. Service Temperature Range: Minus 20 to plus 180 deg F.

4. Solids Content: ASTM D 1644, 59 percent by volume and 71 percent by weight.

5. Color: White.

C. Breather Mastic: Water based;suitable for indoor and outdoor use on above ambient services.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; CP-10.
b. Foster Products Corporation, H. B. Fuller Company; 35-00. c. ITW TACC, Division of Illinois Tool Works; CB-05/15. d. Marathon Industries, Inc.; 550.
e. Mon-Eco Industries, Inc.; 55-50.

2. Water-Vapor Permeance: ASTM F 1249, 3 perms at 0.0625-inch dry film thickness.

3. Service Temperature Range: Minus 20 to plus 200 deg F.

4. Solids Content: 63 percent by volume and 73 percent by weight.

5. Color: White.

2.5 SEALANTS
A. Joint Sealants:

1. Joint Sealants for Cellular-Glass Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; CP-76.
b. Foster Products Corporation, H. B. Fuller Company; 30-45. c. Marathon Industries, Inc.; 405.
d. Mon-Eco Industries, Inc.; 44-05.

B. ASJ Flashing Sealants, and Vinyl, PVDC, and PVC Jacket Flashing Sealants:

1. Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; CP-76.

2. Materials shall be compatible with insulation materials, jackets, and substrates.

3. Fire- and water-resistant, flexible, elastomeric sealant.

4. Service Temperature Range: Minus 40 to plus 250 deg F.

5. Color: White.

6. For indoor applications, use sealants that have a VOC content of 250 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

2.6 FACTORY-APPLIED JACKETS
A. Insulation system schedules indicate factory-applied jackets on various applications. When factoryapplied jackets are indicated, comply with the following:

1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing; complying with ASTM C 1136, Type I.

Page 1038 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 6

2. ASJ-SSL: ASJ with self-sealing, pressure-sensitive, acrylic-based adhesive covered by a removable protective strip; complying with ASTM C 1136, Type I.

3. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing; complying with ASTM C 1136, Type II.

4. PVDC Jacket for Indoor Applications: 4-mil- thick, white PVDC biaxially oriented barrier film with a permeance at 0.02 perms when tested according to ASTM E 96 and with a flame-spread index of 5 and a smoke-developed index of 20 when tested according to ASTM E 84. a. Products: Subject to compliance with requirements, provide one of the following:
1) Dow Chemical Company (The); Saran 540 Vapor Retarder Film and Saran 560 Vapor Retarder Film.

5. PVDC-SSL Jacket: PVDC jacket with a self-sealing, pressure-sensitive, acrylic-based adhesive covered by a removable protective strip.
a. Products: Subject to compliance with requirements, provide one of the following:
1) Dow Chemical Company (The); Saran 540 Vapor Retarder Film and Saran 560 Vapor Retarder Film.

2.7 FIELD-APPLIED FABRIC-REINFORCING MESH
A. Woven Polyester Fabric: Approximately 1 oz./sq. yd. with a thread count of 10 strands by 10 strands/sq. inch, in a Leno weave, for equipment and pipe.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Foster Products Corporation, H. B. Fuller Company; Mast-A-Fab. b. Vimasco Corporation; Elastafab 894.

2.8 FIELD-APPLIED JACKETS
A. Field-applied jacketsshall comply with ASTM C 921, Type I, unless otherwise indicated.

B. PVC Jacket: High-impact-resistant, UV-resistant PVC complying with ASTM D 1784, Class 16354- C; thickness as scheduled; roll stock ready for shop or field cutting and forming. Thicknessisindicated in field-applied jacket schedules.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Johns Manville; Zeston.
b. P.I.C. Plastics, Inc.; FG Series.
c. Proto PVC Corporation; LoSmoke.
d. Speedline Corporation; SmokeSafe.

2. Adhesive: Asrecommended by jacket material manufacturer.

3. Color: White.

4. Factory-fabricated fitting covers to match jacket if available; otherwise, field fabricate.

Page 1039 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 7
a. Shapes: 45- and 90-degree, short- and long-radius elbows, tees, valves, flanges, unions, reducers, end caps, soil-pipe hubs, traps, mechanical joints, and P-trap and supply covers for lavatories.

2.9 TAPES
A. ASJ Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Avery Dennison Corporation, Specialty Tapes Division; Fasson 0835. b. Compac Corp.; 104 and 105.
c. Ideal Tape Co., Inc., an American Biltrite Company; 428 AWF ASJ. d. Venture Tape; 1540 CW Plus, 1542 CW Plus, and 1542 CW Plus/SQ.

2. Width: 3 inches.

3. Thickness: 11.5 mils.

4. Adhesion: 90 ouncesforce/inch in width.

5. Elongation: 2 percent.

6. Tensile Strength: 40 lbf/inch in width.

7. ASJ Tape Disks and Squares: Precut disks or squares of ASJ tape.

B. FSK Tape: Foil-face, vapor-retarder tape matching factory-applied jacket with acrylic adhesive; complying with ASTM C 1136.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Avery Dennison Corporation, Specialty Tapes Division; Fasson 0827. b. Compac Corp.; 110 and 111.
c. Ideal Tape Co., Inc., an American Biltrite Company; 491 AWF FSK. d. Venture Tape; 1525 CW, 1528 CW, and 1528 CW/SQ.

2. Width: 3 inches.

3. Thickness: 6.5 mils.

4. Adhesion: 90 ouncesforce/inch in width.

5. Elongation: 2 percent.

6. Tensile Strength: 40 lbf/inch in width.

7. FSK Tape Disks and Squares: Precut disks or squares of FSK tape.

C. PVC Tape: White vapor-retarder tape matching field-applied PVC jacket with acrylic adhesive. Suitable for indoor and outdoor applications.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Avery Dennison Corporation, Specialty Tapes Division; Fasson 0555. b. Compac Corp.; 130.
c. Ideal Tape Co., Inc., an American Biltrite Company; 370 White PVC tape. d. Venture Tape; 1506 CW NS.

2. Width: 2 inches.

3. Thickness: 6 mils.

4. Adhesion: 64 ouncesforce/inch in width.

Page 1040 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 8

5. Elongation: 500 percent.

6. Tensile Strength: 18 lbf/inch in width.

D. PVDC Tape: White vapor-retarder PVDC tape with acrylic adhesive.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Dow Chemical Company (The); Saran 540 Vapor Retarder Tape.

2. Width: 3 inches.

3. Film Thickness: 4 mils.

4. Adhesive Thickness: 1.5 mils.

5. Elongation at Break: 145 percent.

6. Tensile Strength: 55 lbf/inch in width.

PART 3 - EXECUTION

3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.

B. Coordinate insulation installation with the trade installing heat tracing. Comply with requirementsfor heat tracing that apply to insulation.

C. Mix insulating cements with clean potable water; if insulating cements are to be in contact with stainlesssteel surfaces, use demineralized water.

3.2 GENERAL INSTALLATION REQUIREMENTS
A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of equipment and piping including fittings, valves, and specialties.

B. Install insulation materials, forms, vapor barriers or retarders, jackets, and thicknesses required for each item of equipment and pipe system as specified in insulation system schedules.

C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.

D. Install insulation with longitudinal seams at top and bottom of horizontal runs.

E. Install multiple layers of insulation with longitudinal and end seamsstaggered.

F. Do not weld brackets, clips, or other attachment devices to piping, fittings, and specialties.

G. Keep insulation materials dry during application and finishing.

H. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.

Page 1041 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 9
I. Install insulation with least number of joints practical.

J. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.

1. Install insulation continuously through hangers and around anchor attachments.

2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.

3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation materialmanufacturer.

4. Cover inserts with jacket material matching adjacent pipe insulation. Install shields over jacket, arranged to protect jacket from tear or puncture by hanger, support, and shield.

K. Apply adhesives, mastics, and sealants at manufacturer'srecommended coverage rate and wet and dry film thicknesses.

L. Install insulation with factory-applied jackets as follows:

1. Draw jacket tight and smooth.

2. Cover circumferential joints with 3-inch- wide strips, of same material as insulation jacket. Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.

3. Overlap jacket longitudinal seams at least 1-1/2 inches. Install insulation with longitudinal seams at bottom of pipe. Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 2 inches o.c.
a. For below ambient services, apply vapor-barrier mastic over staples.

4. Cover joints and seams with tape as recommended by insulation material manufacturer to maintain vapor seal.

5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends adjacent to pipe flanges and fittings.

M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness.

N. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.

O. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.

P. For above ambientservices, do not install insulation to the following:

1. Vibration-control devices.

2. Testing agency labels and stamps.

3. Nameplates and data plates.

4. Manholes.

5. Handholes.

6. Cleanouts.

Page 1042 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 10

3.3 PENETRATIONS
A. Insulation Installation at Roof Penetrations: Install insulation continuously through roof penetrations.

1. Seal penetrations with flashing sealant.

2. For applications requiring only indoor insulation, terminate insulation above roof surface and seal with joint sealant. For applications requiring indoor and outdoor insulation, install insulation for outdoor applications tightly joined to indoor insulation ends. Seal joint with joint sealant.

3. Extend jacket of outdoor insulation outside roof flashing at least 2 inches below top of roof flashing.

4. Seal jacket to roof flashing with flashing sealant.

B. Insulation Installation at Underground Exterior Wall Penetrations: Terminate insulation flush with sleeve seal. Seal terminations with flashing sealant.

C. Insulation Installation at Aboveground Exterior Wall Penetrations: Install insulation continuously through wall penetrations.

1. Seal penetrations with flashing sealant.

2. For applications requiring only indoor insulation, terminate insulation inside wall surface and seal with joint sealant. For applications requiring indoor and outdoor insulation, install insulation for outdoor applications tightly joined to indoor insulation ends. Seal joint with joint sealant.

3. Extend jacket of outdoor insulation outside wall flashing and overlap wall flashing at least 2 inches.

4. Seal jacket to wall flashing with flashing sealant.

D. Insulation Installation at Interior Wall and Partition Penetrations (That Are Not Fire Rated): Install insulation continuously through walls and partitions.

E. Insulation Installation at Fire-Rated Wall and Partition Penetrations: Install insulation continuously through penetrations of fire-rated walls and partitions.

1. Comply with requirements in Division 07 Section "Penetration Firestopping" and fire- resistive joint sealers.

F. Insulation Installation at Floor Penetrations:

1. Pipe: Install insulation continuously through floor penetrations.

2. Seal penetrations through fire-rated assemblies. Comply with requirements in Division 07 Section "Penetration Firestopping."

3.4 GENERAL PIPE INSULATION INSTALLATION
A. Requirements in this article generally apply to all insulation materials except where more specific requirements are specified in various pipe insulation material installation articles.

B. Insulation Installation on Fittings, Valves, Strainers, Flanges, and Unions:

1. Install insulation over fittings, valves, strainers, flanges, unions, and other specialties with continuous thermal and vapor-retarder integrity, unless otherwise indicated.

Page 1043 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 11

2. Insulate pipe elbows using preformed fitting insulation or mitered fittings made from same material and density as adjacent pipe insulation. Each piece shall be butted tightly against adjoining piece and bonded with adhesive. Fill joints, seams, voids, and irregular surfaces with insulating cement finished to a smooth, hard, and uniform contour that is uniform with adjoining pipe insulation.

3. Insulate tee fittings with preformed fitting insulation or sectional pipe insulation of same material and thickness as used for adjacent pipe. Cut sectional pipe insulation to fit. Butt each section closely to the next and hold in place with tie wire. Bond pieces with adhesive.

4. Insulate valves using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. For valves, insulate up to and including the bonnets, valve stuffing-box studs, bolts, and nuts. Fill joints, seams, and irregular surfaces with insulating cement.

5. Insulate strainers using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. Fill joints, seams, and irregular surfaces with insulating cement. Insulate strainers so strainer basket flange or plug can be easily removed and replaced without damaging the insulation and jacket.

Provide a removable reusable insulation cover. For below ambient services, provide a design that maintains vapor barrier.

6. Insulate flanges and unions using a section of oversized preformed pipe insulation. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker.

7. Cover segmented insulated surfaces with a layer of finishing cement and coat with a mastic. Install vapor-barrier mastic for below ambient services and a breather mastic for above ambient services.

Reinforce the mastic with fabric-reinforcing mesh. Trowel the mastic to a smooth and well-shaped contour.

8. For services not specified to receive a field-applied jacket except for flexible elastomeric and polyolefin, install fitted PVC cover over elbows, tees, strainers, valves, flanges, and unions.

Terminate ends with PVC end caps. Tape PVC covers to adjoining insulation facing using PVC tape.

9. Stencil or label the outside insulation jacket of each union with the word "UNION." Match size and color of pipe labels.

C. Insulate instrument connections for thermometers, pressure gages, pressure temperature taps, test connections, flow meters, sensors, switches, and transmitters on insulated pipes, vessels, and equipment.

Shape insulation at these connections by tapering it to and around the connection with insulating cement and finish with finishing cement, mastic, and flashing sealant.

D. Install removable insulation covers at locations indicated. Installation shall conform to the following:

1. Make removable flange and union insulation from sectional pipe insulation of same thickness as that on adjoining pipe. Install same insulation jacket as adjoining pipe insulation.

2. When flange and union covers are made from sectional pipe insulation, extend insulation from flanges or union long at least two times the insulation thickness over adjacent pipe insulation on each side of flange or union. Secure flange cover in place with stainless- steel or aluminum bands.

Select band material compatible with insulation and jacket.

3. Construct removable valve insulation covers in same manner as for flanges except divide the twopart section on the vertical center line of valve body.

Page 1044 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 12

4. When covers are made from block insulation, make two halves, each consisting of mitered blocks wired to stainless-steel fabric. Secure this wire frame, with its attached insulation, to flanges with tie wire. Extend insulation at least 2 inches over adjacent pipe insulation on each side of valve.

Fill space between flange or union cover and pipe insulation with insulating cement. Finish cover assembly with insulating cement applied in two coats. After first coat is dry, apply and trowel second coat to a smooth finish.

5. Unless a PVC jacket is indicated in field-applied jacket schedules, finish exposed surfaces with a metal jacket.

3.5 FLEXIBLE ELASTOMERIC INSULATION INSTALLATION
A. Seal longitudinalseams and end joints with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

B. Insulation Installation on Pipe Flanges:

1. Install pipe insulation to outer diameter of pipe flange.

2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.

3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with cut sections of sheet insulation of same thickness as pipe insulation.

4. Secure insulation to flanges and sealseams with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

C. Insulation Installation on Pipe Fittings and Elbows:

1. Install mitered sections of pipe insulation.

2. Secure insulation materials and sealseams with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install preformed valve covers manufactured of same material as pipe insulation when available.

2. When preformed valve covers are not available, install cut sections of pipe and sheet insulation to valve body. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

3. Install insulation to flanges as specified for flange insulation application.

4. Secure insulation to valves and specialties and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

3.6 MINERAL-FIBER INSULATION INSTALLATION
A. Insulation Installation on Straight Pipes and Tubes:

1. Secure each layer of preformed pipe insulation to pipe with wire or bands and tighten bands without deforming insulation materials.

2. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with vaporbarrier mastic and joint sealant.

3. For insulation with factory-applied jackets on above ambient surfaces, secure laps with outward clinched staples at 6 inches o.c.

Page 1045 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 13

4. For insulation with factory-applied jackets on below ambient surfaces, do not staple longitudinal tabs but secure tabs with additional adhesive as recommended by insulation material manufacturer and seal with vapor-barrier mastic and flashing sealant.

B. Insulation Installation on Pipe Flanges:

1. Install preformed pipe insulation to outer diameter of pipe flange.

2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.

3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with mineral-fiber blanket insulation.

4. Install jacket material with manufacturer's recommended adhesive, overlap seams at least 1 inch, and seal joints with flashing sealant.

C. Insulation Installation on Pipe Fittings and Elbows:

1. Install preformed sections of same material as straight segments of pipe insulation when available.

2. When preformed insulation elbows and fittings are not available, install mitered sections of pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation materials with wire or bands.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install preformed sections of same material as straight segments of pipe insulation when available.

2. When preformed sections are not available, install mitered sections of pipe insulation to valve body.

3. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

4. Install insulation to flanges as specified for flange insulation application.

3.7 POLYOLEFIN INSULATION INSTALLATION
A. Insulation Installation on Straight Pipes and Tubes:

1. Seal split-tube longitudinal seams and end joints with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

B. Insulation Installation on Pipe Flanges:

1. Install pipe insulation to outer diameter of pipe flange.

2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.

3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with cut sections of polyolefin sheet insulation of same thickness as pipe insulation.

4. Secure insulation to flanges and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

C. Insulation Installation on Pipe Fittings and Elbows:

Page 1046 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 14

1. Install mitered sections of polyolefin pipe insulation.

2. Secure insulation materials and sealseams with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install cutsections of polyolefin pipe and sheet insulation to valve body.

2. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

3. Install insulation to flanges as specified for flange insulation application.

4. Secure insulation to valves and specialties, and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

3.8 FIELD-APPLIED JACKET INSTALLATION
A. Where FSK jackets are indicated, install as follows:

1. Draw jacket material smooth and tight.

2. Install lap or jointstrips with same material as jacket.

3. Secure jacket to insulation with manufacturer's recommended adhesive.

4. Install jacket with 1-1/2-inch laps at longitudinal seams and 3-inch- wide joint strips at end joints.

5. Seal openings, punctures, and breaks in vapor-retarder jackets and exposed insulation with vaporbarrier mastic.

B. Where PVC jackets are indicated, install with 1-inch overlap at longitudinal seams and end joints; for horizontal applications, install with longitudinal seams along top and bottom of tanks and vessels. Seal with manufacturer's recommended adhesive.

1. Apply two continuous beads of adhesive to seams and joints, one bead under lap and the finish bead along seam and joint edge.

C. Where metal jackets are indicated, install with 2-inch overlap at longitudinal seams and end joints. Overlap longitudinal seams arranged to shed water. Seal end joints with weatherproof sealant recommended by insulation manufacturer. Secure jacket with stainless-steel bands 12 inches o.c. and at end joints.

D. Where PVDC jackets are indicated, install as follows:

1. Apply three separate wraps of filament tape per insulation section to secure pipe insulation to pipe prior to installation of PVDC jacket.

2. Wrap factory-presized jackets around individual pipe insulation sections with one end overlapping the previously installed sheet. Install presized jacket with an approximate overlap at butt joint of 2 inches over the previous section. Adhere lap seal using adhesive or SSL, and then apply 1-1/4 circumferences of appropriate PVDC tape around overlapped butt joint.

3. Continuous jacket can be spiral wrapped around a length of pipe insulation. Apply adhesive or PVDC tape at overlapped spiral edge. When electing to use adhesives, refer to manufacturer's written instructionsfor application of adhesives along thisspiral edge to maintain a permanent bond.

4. Jacket can be wrapped in cigarette fashion along length of roll for insulation systems with an outer circumference of 33-1/2 inches or less. The 33-1/2-inch- circumference limit

Page 1047 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 15
allows for 2-inch- overlap seal. Using the length of roll allows for longer sections of jacket to be installed at one time. Use adhesive on the lap seal. Visually inspect lap seal for "fishmouthing," and use PVDC tape along lap seal to secure joint.

5. Repair holes or tears in PVDC jacket by placing PVDC tape over the hole or tear and wrapping a minimum of 1-1/4 circumferences to avoid damage to tape edges.

3.9 FINISHES
A. Equipment and Pipe Insulation with ASJ or Other Paintable Jacket Material: Paint jacket with paint system identified below and as specified in Division 09 painting Sections.

1. Flat Acrylic Finish: Two finish coats over a primer that is compatible with jacket material and finish coat paint. Add fungicidal agent to render fabric mildew proof. a. Finish Coat Material: Interior, flat, latex-emulsion size.

B. Flexible Elastomeric Thermal Insulation: After adhesive has fully cured, apply two coats of insulation manufacturer's recommended protective coating.

C. Color: Final color as selected by Architect. Vary first and second coats to allow visual inspection of the completed Work.

D. Do not field paint aluminum or stainless-steel jackets.

3.10 FIELD QUALITY CONTROL
A. Perform tests and inspections.

B. Tests and Inspections:

1. Inspect pipe, fittings, strainers, and valves, randomly selected by Architect, by removing fieldapplied jacket and insulation in layers in reverse order of their installation. Extent of inspection shall be limited to three locations of straight pipe, three locations of threaded fittings, three locations of welded fittings, two locations of threaded strainers, locations of welded strainers, locations of threaded valves, and locations of flanged valves for each pipe service defined in the "Piping Insulation Schedule, General" Article.

C. All insulation applications will be considered defective Work if sample inspection reveals noncompliance with requirements.

3.11 PIPING INSULATION SCHEDULE, GENERAL
A. Acceptable preformed pipe and tubular insulation materials and thicknesses are identified for each piping system and pipe size range. If more than one material is listed for a piping system, selection from materials listed is Contractor's option.

B. Items Not Insulated: Unless otherwise indicated, do not install insulation on the following:

1. Drainage piping located in crawlspaces.

2. Underground piping.

3. Chrome-plated pipes and fittings unlessthere is a potential for personnel injury.

Page 1048 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 16

3.12 INDOOR PIPING INSULATION SCHEDULE
A. Domestic Cold and Non-potable Cold Water: Insulation shall be one of the following:

1. Flexible Elastomeric: 1/2 inch thick for pipe sizes less than 1-1/2 inches, 1 inch thick for pipe sizes 2 inches and greater

2. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1/2 inch thick for pipe sizes less than 1- 1/2 inches, 1 inch thick for pipe sizes 2 inches and greater

3. Polyolefin: 1/2 inch thick for pipe sizes less than 1-1/2 inches, 1 inch thick for pipe sizes 2 inches and greater
B. Domestic Hot, and Re-circulated Hot Water and Tempered Water: Insulation shall be one of the following:

1. Flexible Elastomeric: 1 inch thick.

2. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch thick.

3. Polyolefin: 1 inch thick.

C. Horizontal Stormwater and Emergency Drain: Insulation shall be one of the following:

1. Flexible Elastomeric: 1 inch thick.

2. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch thick.

3. Polyolefin: 1 inch thick.

D. Roof Drain and Emergency Drain Bodies: Insulation shall be one of the following:

1. Flexible Elastomeric: 1 inch thick.

2. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch Insert thicknessthick.

3. Polyolefin: 1 inch thick.

E. Exposed Sanitary Drains, Domestic Water, Domestic Hot Water, and Stops at lavatories shall be insulated and finished with Truebro Model No. 102 "Lav-Guard" or Brocar "Trap-Wrap" white insulation kit.

F. Sanitary Waste Piping Where Heat Tracing Is Installed, insulation shall be:

1. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1-1/2 inchesthick.

3.13 OUTDOOR, ABOVEGROUND PIPING INSULATION SCHEDULE
A. Domestic Cold, Hot, and Recirculated Hot Water: Insulation shall be one of the following:

1. Flexible Elastomeric: 2 inches thick.

2. Mineral-Fiber, Preformed Pipe Insulation, Type I: 2 inchesthick.

B. Sanitary Waste Piping Where Heat Tracing IsInstalled: Insulation shall be:

1. Mineral-Fiber, Preformed Pipe Insulation, Type I: 2 inchesthick.

3.14 OUTDOOR, FIELD-APPLIED JACKET SCHEDULE
A. Install jacket over insulation material. For insulation with factory-applied jacket, install the fieldapplied jacket over the factory-applied jacket.

Page 1049 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING INSULATION 22 0700 - 17
B. If more than one material is listed, selection from materialslisted is Contractor's option.

C. Piping, Exposed:

1. PVC: 20 mils thick.

3.15 Aluminum, Smooth or Corrugated or Stucco Embossed: 0.016 inch thick.

END OF SECTION 22 0700

Page 1050 of 2548 ends
Page 1051 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 1
SECTION 22 1118 - DOMESTIC WATER DISTRIBUTION SYSTEM
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Under-building slab supply, and aboveground domestic water supply and recirculation pipes, tubes, fittings, and certain specialties inside the building from 1’-0” above finished floor or 1’-0” inside the exterior wall as shown on the drawings, and as coordinated with the related work of Division 33.

2. Flexible connectors.

3. Piping encasement.

4. Water meters.

5. Application of valves.

B. Related Sections:

1. Division 33 Section "Facility Water Distribution Piping" for water-service piping outside the building from the source to a point 1’-0” above finished floor or 1’-0” inside the exterior wall of the building as shown on the drawings.

2. Division 22 0523 "General Duty Valvesfor Plumbing Piping"

3. Section 22 0000 "Common Work Results of Plumbing."

4. Section 22 2114 "Plumbing Specialties."

5. Section 22 4000 "Plumbing Fixtures."

6. Section 22 4500 "Plumbing Equipment."

1.3 SUBMITTALS
A. Product Data: For each type of product indicated.

B. Field quality-control reports.

C. For any systemsrequiring State code pre-approval, provide lettersfrom the State for same.

Page 1052 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 2
D. Documentation that proposed products meet California Health and Safety Code 116875 (AB 1953) - 2010, for 25% low lead content of piping, pipe fittings, and faucets for water intended for human consumption.

E. At closeout, Northwestern University Maintenance Requirement Forms, see Division 01 for more information.

1.4 QUALITY ASSURANCE
A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

B. Comply with California Health and Safety Code 116875 (AB 1953) - 2010, for 25% low lead content of piping, pipe fittings, and faucets for water intended for human consumption, and NSF/ANSI Standard 61, including Annex G-2010 - Drinking Water System Components - Low Lead Content Requirement.

C. To assure uniformity and compatibility of piping components in grooved end piping systems, all grooved products utilized shall be supplied by the same manufacturer.

D. All grooved couplings shall be installed strictly according to grooved manufacturer’s instructions including torque verification and specific lubrication as published.

E. Flexible connectors shall be installed according to the manufacturer's instructions, with any adjacent special pipe support/guiding required.

F. Comply with FM Global requirements for cross connections, and for any pressure reducing valvesfor fire protection service.

1.5 SPECIAL WARRANTIES
A. Five (5) years, see Division 01 for more information.

PART 2 - PRODUCTS

2.1 PIPING MATERIALS
A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, fitting materials, and joining methods for specific services, service locations, and pipe sizes.

2.2 COPPER TUBE AND FITTINGS
A. Hard Copper Tube: ASTM B 88, Type L water tube, drawn temper.

1. Cast-Copper Solder-Joint Fittings: ASME B16.18, pressure fittings.

2. Wrought-Copper Solder-Joint Fittings: ASME B16.22, wrought-copper pressure fittings.

3. Bronze Flanges: ASME B16.24, Class 150, with solder-joint ends.

4. Copper Unions: MSS SP-123, cast-copper-alloy, hexagonal-stock body, with ball-and- socket, metal-to-metal seating surfaces, and solder-joint or threaded ends.

Page 1053 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 3

5. Grooved-End Copper Fittings: ASTM B 75 copper tube, or ASTM B 152 wrought copper, with copper tubing sized grooved ends designed to accept grooved couplings. Flaring of tube and fitting ends to IPS dimensions is not permitted.

6. Grooved-End-Tube Couplings: Rigid pattern, unless otherwise indicated; gasketed fitting. Ductileiron housing with keys matching pipe and fitting grooves: 2” through 8”: Installation ready rigid coupling with Grade EHP/EPDM gaskets (unless noted otherwise herein) rated for maximum 250 deg F for use with housing, and steel bolts and nuts. Victaulic Style 607.

7. Grooved-End-Tube Mechanical Tube Fittings: Copper-tube dimensions and design similar to AWWA C606. Bronze upper housing and copper-colored enamel coated ductile iron lower housing, threaded outlet and locating collar, EPDM synthetic rubber gasket suit able for hot and cold water, and bolts and nuts. Victaulic Style 622.

2.3 DUCTILE-IRON PIPE AND FITTINGS (For 3" and Larger Pipe Sizes) A. Mechanical-Joint, Ductile-Iron Pipe:

1. AWWA C151/A21.51, with mechanical-joint bell and plain spigot end unless grooved or flanged ends are indicated.

2. Glands, Gaskets, and Bolts: AWWA C111/A21.11, ductile- or gray-iron glands, rubber gaskets, and steel bolts.

B. Standard-Pattern, Mechanical-Joint Fittings:

1. AWWA C110/A21.10, ductile or gray iron.

2. Glands, Gaskets, and Bolts: AWWA C111/A21.11, ductile- or gray-iron glands, rubber gaskets, and steel bolts.

C. Compact-Pattern, Mechanical-Joint Fittings:

1. AWWA C153/A21.53, ductile iron.

2. Glands, Gaskets, and Bolts: AWWA C111/A21.11, ductile- or gray-iron glands, rubber gaskets, and steel bolts.

D. Plain-End, Ductile-Iron Pipe: AWWA C151/A21.51.

2.4 GALVANIZED STEEL PIPE AND FITTINGS (Only for Limited Repair of Existing Galvanized Sections, and Joint Types and Supports to Match Adjacent Existing Similar Piping, and 6" and larger sizes only).

A. Galvanized-Steel Pipe: ASTM A 53/A 53M, Standard Weight. Include ends matching existing joining method(s).

1. Galvanized-Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M or ASTM A 106/A 106M, Standard Weight, seamless steel pipe.

2. Galvanized, Gray-Iron Fittings: ASME B16.4, Class 125, standard pattern.

3. Malleable-Iron Unions: ASME B16.39, Class 150, hexagonal-stock body with ball- and-socket, metal-to-metal, with bronze seating surfaces.

4. Flanges: ASME B16.1, Class 125, cast iron.

Page 1054 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 4

2.5 PIPING JOINING MATERIALS
A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch thick or ASME B16.21, nonmetallic and asbestos free, unless otherwise indicated; full-face or ring type unless otherwise indicated.

B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.

C. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813. Shall be Lead free NSF/ANSI 61 compliant.

D. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general- duty brazing unless otherwise indicated. Shall be Lead free NSF/ANSI 61 compliant.

E. Flux: ASTM B 813, water flushable.

F. Pipe Thread Tape: Food grade commercial duty pipe thread sealant tape only.

2.6 TRANSITION FITTINGS
A. Fitting-Type Transition Couplings: Manufactured piping coupling or specified piping system fitting.

B. Sleeve-Type Transition Coupling: AWWA C219.

2.7 DIELECTRIC FITTINGS
A. General Requirements: Assembly of copper alloy and ferrous materials or ferrous material body with separating nonconductive insulating material suitable for system fluid, pressure, and temperature.

B. Dielectric Flanges:

1. Description:
a. Factory-fabricated, bolted, companion-flange assembly. b. Pressure Rating: 150 psig.
c. End Connections: Solder-joint copper alloy and threaded ferrous; threaded solder- joint copper alloy and threaded ferrous.

C. Dielectric-Flange Kits:

1. Description:
a. Nonconducting materials for field assembly of companion flanges. b. Pressure Rating: 150 psig.
c. Gasket: Neoprene or phenolic.
d. Bolt Sleeves: Phenolic or polyethylene.
e. Washers: Phenolic with steel backing washers.

D. Dielectric Couplings:

Page 1055 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 5

1. Description:
a. Galvanized-steel coupling.
b. Pressure Rating: 300 psig at 225 deg F.
c. End Connections: Female threaded.
d. Lining: Inert and noncorrosive, thermoplastic.

E. Dielectric Nipples:

1. Description:
a. Electroplated steel nipple complying with ASTM F 1545. b. Pressure Rating: 300 psig at 225 deg F.
c. End Connections: Male threaded or grooved.
d. Lining: Inert and noncorrosive, propylene.

2.8 FLEXIBLECONNECTORS
A. Bronze-Hose Flexible Connectors: Corrugated-bronze tubing with bronze wire-braid covering and ends brazed to inner tubing.

1. Working-Pressure Rating: Minimum 200 psig (1380 kPa).

2. End Connections NPS 2 (DN 50) and Smaller: Threaded copper pipe or plain-end copper tube.

3. End Connections NPS 2-1/2 (DN 65) and Larger: Flanged copper alloy.

B. Stainless-Steel-Hose Flexible Connectors: Corrugated-stainless-steel tubing with stainless-steel wire-braid covering and ends welded to inner tubing.

1. Working-Pressure Rating: Minimum 200 psig (1380 kPa).

2. End Connections NPS 2 (DN 50) and Smaller: Threaded stainless steel pipe nipple.

3. End Connections NPS 2-1/2 (DN 65) and Larger: Flanged stainless steel pipe nipple.

C. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Flex-Hose.

2. Flexicraft.

3. Hyspan.

4. Flex Precision.

Page 1056 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 6

3.1 JOINT CONSTRUCTION
A. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

B. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

C. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

D. Brazed Joints: Join copper tube and fittings according to CDA's "Copper Tube Handbook," "Brazed Joints" Chapter. Shall be Lead free NSF/ANSI 61 compliant.

E. Soldered Joints: Apply ASTM B 813, water-flushable flux to end of tube. Join copper tube and fittings according to ASTM B 828 or CDA's "Copper Tube Handbook." Shall be Lead free NSF/ANSI 61 compliant.

F. Joint Construction for Grooved-End Copper Tubing: Make joints according to AWWA C606. Roll groove ends of tubes. Lubricate and install gasket over ends of tubes or tube and fitting. Install coupling housing sections over gasket with keys seated in tubing grooves. Install and tighten housing bolts.

G. Joint Construction for Grooved-End, Ductile-Iron Piping: Make radius cut joints according to AWWA C606. Cut round-bottom grooves in ends of pipe at gasket-seat dimension required for specified (flexible or rigid) joint. Lubricate and install gasket over ends of pipes or pipe and fitting. Install coupling housing sections over gasket with keys seated in piping grooves. Install and tighten housing bolts.

H. Flanged Joints: Select appropriate asbestos-free, nonmetallic gasket material in size, type, and thickness suitable for domestic water service. Join flanges with gasket and bolts according to ASME B31.9.

I. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.

Page 1057 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 7
J. Grooved Joints for Copper Piping: Roll grooves in ends of pipe based on pipe and coupling manufacturer's written instructions for pipe wall thickness. The gasket style and elastomeric material (grade) shall be verified as suitable for the intended service as specified. Grooved end shall be clean and free from indentations, projections, and roll marksin the area from pipe end to groove. A representative shall provide on-site training for contractor's field personnel. Contractor shall remove and replace any improperly installed products.

3.2 VALVE INSTALLATION
A. General-Duty Valves: Comply with requirements in Division 22 Section "General-Duty Valves for Plumbing Piping" for valve installations. Shall be Lead free NSF/ANSI 61 compliant.

B. Install shutoff valve close to water main on each branch and riser serving plumbing fixtures or equipment, on each water supply to equipment, and on each water supply to plumbing fixtures that do not have supply stops. Use ball valves for piping NPS 2 and smaller. Use OS&Y or NRS gate valves for piping NPS 2-1/2 and larger.

C. Install drain valves for equipment at base of each water riser, at low points in horizontal piping, and where required to drain water piping. Drain valves are specified in Division 22 Section "Domestic Water Piping Specialties."

1. Hose-End Drain Valves: At low points in water mains, risers, and branches.

2. Stop-and-Waste Drain Valves: Instead of hose-end drain valves where indicated.

D. Install balancing valve in each hot-water circulation return branch and discharge side of each pump and circulator. Set balancing valves partly open to restrict but not stop flow. Use ball valves for piping NPS 2 and smaller and butterfly valves for piping NPS 2-1/2 and larger. Comply with requirements in Division 22 Section "Domestic Water Piping Specialties" for balancing valves.

E. For isolation valves at water heaters, install valves that relieve heater pressure when closed.

3.3 TRANSITION FITTING INSTALLATION
A. Install transition couplings at joints of dissimilar piping.

B. Transition Fittings in Aboveground Domestic Water Piping NPS 2 and Smaller: Plastic-to-metal transition [fittings] [or] [unions].

C. Transition Fittings in Underground Domestic Water Piping:

1. NPS 1-1/2 and Smaller: Fitting-type coupling.

2. NPS 2 and Larger: Sleeve-type coupling.

3.4 DIELECTRIC FITTING INSTALLATION
A. Install dielectric fittings in piping at connections of dissimilar metal piping and tubing. Shall be Lead free NSF/ANSI 61 compliant.

B. Dielectric Fittings for NPS 2 and Smaller: Use dielectric couplings or nipples.

C. Dielectric Fittings for NPS 2-1/2 to NPS 4: Use dielectric flanges.

Page 1058 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 8
D. Dielectric Fittings for NPS 5 to NPS 6: Use dielectric flange kits.

3.5 FLEXIBLE CONNECTOR INSTALLATION
A. Install flexible connectors in suction and discharge piping connections to each domestic water pump and in suction and discharge manifold connections to each domestic water booster pump.

B. Install bronze-hose flexible connectors in copper domestic water tubing.

C. Install stainless-steel-hose flexible connectors in non-copper domestic water piping.

3.6 WATER METER INSTALLATION
A. Rough-in domestic water piping, and install water meter as indicated on the drawings according to AWWA M6 and the utility company's requirements.

B. Install water meters with shutoff valves on water-meter inlet and outlet. Provide a valved bypass around meter only if required by the utility company. Support meters, valves, and piping on brick or concrete piers.

C. Install remote registration system according to standards of University, utility company, and of authorities having jurisdiction.

3.7 HANGER AND SUPPORT INSTALLATION
A. Comply with requirements in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment" for pipe hanger and support products and installation.

1. Vertical Piping: MSS Type 8 or 42, clamps.

2. Individual, Straight, Horizontal Piping Runs:
a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers. b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.

3. Base of Vertical Piping: MSS Type 52, spring hangers.

B. Support vertical piping and tubing at base and at each floor.

C. Rod diameter may be reduced one size for double-rod hangers, to a minimum of 3/8 inch.

D. Install hangers for copper tubing with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 3/4 and Smaller: 60 inches with 3/8-inch rod.

2. NPS 1 and NPS 1-1/4: 72 inches with 3/8-inch rod.

3. NPS 1-1/2 and NPS 2: 96 inches with 3/8-inch rod.

4. NPS 2-1/2: 108 inches with 1/2-inch rod.

5. NPS 3 to NPS 5: 10 feet with 1/2-inch rod.

6. NPS 6: 10 feet with 5/8-inch rod.

E. Install supports for vertical copper tubing every 10 feet.

Page 1059 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 9
F. Install hangers for ductile iron piping with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 3: 12 feet with 1/2-inch rod.

2. NPS 4: 12 feet with 5/8-inch rod.

3. NPS 6: 12 feet with 3/4-inch rod.

4. NPS 8 and Larger: 12 feet with 3/4-inch rod.

G. Installsupportsfor vertical ductile iron piping every 15 feet.

3.8 CONNECTIONS
A. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to equipment and machinesto allow service and maintenance.

C. Connect domestic water piping to water-service piping at a point 1’-0” above finished floor or 1’- 0” inside the exterior wall, as shown on the drawings, with a shutoff valve using a transition fitting to join dissimilar piping materials then extend and connect to the following:

1. Water Heaters: Cold-water inlet and hot-water outlet piping in sizes indicated, but not smaller than sizes of water heater connections.

2. Plumbing Fixtures: Cold- and hot-water supply piping in sizes indicated, but not smaller than required by plumbing code. Comply with requirements in Division 22 plumbing fixture Sections for connection sizes.

3. Equipment: Cold- and hot-water supply piping as indicated, but not smaller than equipment connections. Provide shutoff valve and union for each connection. Use flangesinstead of unions for NPS 2-1/2 and larger.

3.9 IDENTIFICATION
A. Identify system components. Comply with requirementsin Division 22 Section "Identification for Plumbing Piping and Equipment" for identification materials and installation.

B. Label pressure piping with system operating pressure.

3.10 FIELD QUALITY CONTROL
A. Perform tests and inspections.

B. Piping Inspections:

1. Do not enclose, cover, or put piping into operation until it has been inspected and approved by authorities having jurisdiction, FMDC and FMO.

2. During installation, notify authorities having jurisdiction at least one day before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction:
a. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in and before setting fixtures. b. Final Inspection: Arrange final inspection for authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.

Page 1060 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 10

3. Re-inspection: If authorities having jurisdiction find that piping will not pass tests or inspections, make required corrections and arrange for re-inspection.

4. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

C. Piping Tests:

1. Fill domestic. Check components to determine that they are not air bound and that piping is full of water.

2. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of piping tested.

3. Leave new, altered, extended, or replaced domestic water piping uncovered and unconcealed until it has been tested and approved. Expose work that was covered or concealed before it wastested.

4. Cap and subject piping to static water pressure of 50 psig above operating pressure, minimum of 100 psi, without exceeding pressure rating of piping system materials. Isolate test source and allow to stand for four hours. Leaks and loss in test pressure constitute defects that must be repaired.

5. Repair leaks and defects with new materials and retest piping or portion thereof until satisfactory results are obtained.

6. Prepare reports for tests and for corrective action required.

D. Domestic piping will be considered defective if it does not pass tests and inspections.

E. Prepare test and inspection reports.

3.11 ADJUSTING
A. Perform the following adjustments before operation:

1. Close drain valves, hydrants, and hose bibbs.

2. Open shutoff valves to fully open position.

3. Open throttling valves to proper setting.

4. Adjust balancing valves in hot-water-circulation return piping to provide adequate flow. a. Manually adjust ball-type balancing valves in hot-water-circulation return piping to provide hot-water flow in each branch.
b. Adjust calibrated balancing valves to flows indicated.

5. Remove plugs used during testing of piping and for temporary sealing of piping during installation.

6. Remove and clean strainer screens. Close drain valves and replace drain plugs.

7. Remove filter cartridges from housings and verify that cartridges are as specified for application where used and are clean and ready for use.

8. Check plumbing specialties and verify proper settings, adjustments, and operation.

3.12 CLEANING
A. Clean and disinfect potable domestic water piping as follows (and in accordance with local code and jurisdiction):

Page 1061 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 11

1. Purge new piping and parts of existing piping that have been altered, extended, or repaired before using.

2. Use purging and disinfecting procedures prescribed by authorities having jurisdiction; if methods are not prescribed, use procedures described in either AWWA C651 or AWWA C652 or follow procedures described below:
a. Flush piping system with clean, potable water until dirty water does not appear at outlets. b. Fill and isolate system according to either of the following:
1) Fill system or part thereof with water/chlorine solution with at least 50 ppm of chlorine. Isolate with valves and allow to stand for 24 hours. 2) Fill system or part thereof with water/chlorine solution with at least 200 ppm of chlorine. Isolate and allow to stand for three hours.
c. Flush system with clean, potable water until no chlorine is in water coming from system after the standing time.
d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedures if biological examination shows contamination.

B. Prepare and submit reports of purging and disinfecting activities.

C. Clean interior of domestic water piping system. Remove dirt and debris as work progresses.

3.13 PIPING SCHEDULE
A. Transition and special fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated.

B. Flanges and unions may be used for aboveground piping joints unless otherwise indicated.

C. Under-building-slab, domestic water piping, NPS 2 1/2 and smaller, shall be the following:

1. Soft copper tube, ASTM B 88, Type K; no joints allowed under floor slabs.

D. Under-building-slab, domestic water piping, NPS 3 and larger, shall be the following:

1. Ductile Iron; with ductile iron fittings, and mechanical joints.

E. Aboveground domestic water piping, NPS 2 and smaller, shall be the following:

1. Hard copper tube, ASTM B 88, Type L; cast or wrought copper solder-joint fittings; and soldered joints. Shall be Lead Free NSF/ANSI 61 compliant.

F. Aboveground domestic water piping, NPS 2 1/2, shall be one of the following:

1. Hard copper tube, ASTM B 88, Type L; cast or wrought copper braze joint fittings; and brazed joints. Shall be Lead Free NSF/ANSI 61 compliant.

2. Hard copper tube, ASTM B 88, Type L; grooved, with matching fittings; and roll grooved joints.

Shall be Lead Free NSF/ANSI 61 compliant.

G. Aboveground domestic water piping, NPS 3 and 4, shall be one of the following:

Page 1062 of 2548 ends

CIB 689- Clark Building Renovations
DOMESTIC WATER DISTRIBUTION SYSTEM 22 1118 - 12

1. Hard copper tube, ASTM B 88, Type L; cast or wrought copper braze-joint fittings; and brazed joints. Shall be Lead Free NSF/ANSI 61 compliant.

2. Hard copper tube, ASTM B 88, Type L; grooved, with matching fittings; and roll grooved joints.

Shall be Lead Free NSF/ANSI 61 compliant.

3. Ductile Iron; with ductile iron fittings, and mechanical or grooved joints. Shall be Lead Free NSF/ANSI 61 compliant.

H. Aboveground domestic water piping, NPS 6 and Larger, shall be the following:

1. Ductile Iron; with ductile iron fittings, and mechanical or grooved joints.

2. Galvanized pipe with mechanical joints.

3.14 VALVE SCHEDULE (Including Access to Same)
A. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply:

1. Shutoff Duty: Use ball valves for piping NPS 2 and smaller. Use OS&Y or NRS gate valves or ball valves with flanged ends for piping NPS 2-1/2 and larger (ball valves only to 3"). Shall be Lead Free NSF/ANSI 61 compliant.

2. Throttling Duty: Use ball valves for piping NPS 2 and smaller. Shall be Lead Free NSF/ANSI 61 compliant.

3. Hot-Water Circulation Piping, Balancing Duty: Memory-stop balancing valves.

4. Drain Duty: Hose-end drain valves. Shall be Lead Free NSF/ANSI 61 compliant.

5. Faucets and fixtures, such as emergency showers, eyewashes, dishwashers, and autoclaves, shall have local shutoff valves within 5' of the faucet/fixture. Valves must be readily accessible. Shall be Lead Free NSF/ANSI 61 compliant.

6. Shut-off isolation valves shall be provided on the branch lines no more than 18" off of the main lines or risers. Additional shut-off isolation valves may be needed further down the branch lines also, and are to be provided to the satisfaction of the University. Shall be Lead Free NSF/ANSI 61 compliant.

B. Iron grooved-end valves may be used with grooved-end piping. Shall be Lead Free NSF/ANSI 61 compliant.

C. Access panels shall be provided for any plumbing valves that may be in walls or in-accessible ceilings.

Access panels shall be a minimum of 12" x 12".

END OF SECTION 22 1118

Page 1063 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 1
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes sanitary drainage inside the building up to a point 5’-0” outside the building and vent piping inside the building including:

1. Pipe and fittings.

2. Special pipe fittings.

1.3 PERFORMANCE REQUIREMENTS
A. Components and installation shall be capable of withstanding the following minimum working pressure, unless otherwise indicated:

1. Soil, Waste, and Vent Piping: 10-foot head of water.

1.4 SUBMITTALS
A. LEED Submittal:

1. Product Data for Credit EQ 4.1: For solvent cements and adhesive primers, including printed statement of VOC content.

B. Field quality-control inspection and test reports.

1.5 QUALITY ASSURANCE
A. Piping materialsshall bear label, stamp, or other markings ofspecified testing agency.

B. Comply with NSF 14, "Plastics Piping Systems Components and Related Materials," for plastic piping components. Include marking with "NSF-DWV" for plastic drain, waste, and vent piping; and "NSF- drain" for plastic drain piping.

1.6 FIELD CONDITIONS
A. Interruption of Existing Sanitary Waste Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated:

Page 1064 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 2

1. Notify the University no fewer than seven days in advance of proposed interruption of sanitary waste service.

2. Do not proceed with interruption of sanitary waste service without the University’s written permission.

PART 2 - PRODUCTS

2.1 PIPING MATERIALS
A. Hub-and-Spigot, Cast-Iron Pipe and Fittings: ASTM A 74, Service class.

1. Gaskets: ASTM C 564, rubber.

B. Hubless Cast-Iron Pipe and Fittings: ASTM A 888 or CISPI 301.

1. Shielded Couplings: ASTM C 1277 assembly of metal shield or housing, corrosionresistant fasteners, and rubber sleeve with integral, center pipe stop. a. Standard, Shielded, Stainless-Steel Couplings: CISPI 310, with stainless-steel corrugated shield; stainless-steel bands and tightening devices; and ASTM C 564, rubber sleeve. b. Heavy-Duty, Shielded, Stainless-Steel Couplings: With stainless-steel shield, stainless-steel bands and tightening devices, and ASTM C 564, rubber sleeve.

C. Schedule 40 PVC Pipe: ASTM D 2665, solid-wall drain, waste, and vent.

1. PVC Socket Fittings: ASTM D 2665, socket type, made to ASTM D 3311, drain, waste, and vent patterns.

2. Solvent Cement and Adhesive Primer:
a. Use PVC solvent cement that has a VOC content of 510 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
b. Use adhesive primer that has a VOC content of 550 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

D. Steel Pipe: ASTM A 53/A 53M, Type E or S, Grade A or B, Schedule 40, galvanized. Include ends matching joining method.

1. Drainage Fittings: ASME B16.12, galvanized, threaded, cast-iron drainage pattern.

2. Pressure Fittings:
a. Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M or ASTM A 106, Schedule 40, galvanized, seamless steel pipe. Include ends matching joining method. b. Malleable-Iron Unions: ASME B16.39; Class 150; hexagonal-stock body with ball- andsocket, metal-to-metal, bronze seating surface; and female threaded ends. c. Gray-Iron, Threaded Fittings: ASME B16.4, Class 125, galvanized, standard pattern. d. Cast-Iron Flanges: ASME B16.1, Class 125.
e. Cast-Iron, Flanged Fittings: ASME B16.1, Class 125, galvanized.

E. CPVC Drainage Pipe and Fittings: ASTM F 2618 pipe and drainage-pattern fittings.

Page 1065 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 3

1. Acceptable Manufacturers: Charlotte Chemdrain (Basis of Design)

2. Solvent Cement for Joining CPVC Piping: ASTM F 493. Include primer according to ASTM F 656.

PART 3 - EXECUTION

3.1 EXCAVATION
A. Refer to Division 31 Section “Earth Moving” for excavating, trenching, and backfilling.

3.2 PIPING APPLICATIONS
A. Special pipe fittings with pressure ratings at least equal to piping pressure ratings may be used in applications below, unless otherwise indicated.

B. Flanges and unions may be used on aboveground pressure piping, unless otherwise indicated.

C. Aboveground,soil & waste piping shall be:

1. Hubless cast-iron soil pipe and fittings; standard, shielded, stainless-steel couplings; and hublesscoupling joints.

D. Aboveground, vent piping shall be one of the following:

1. Hubless cast-iron soil pipe and fittings; standard, shielded, stainless-steel couplings; and hublesscoupling joints.

2. Solid-wall PVC pipe, PVC socket fittings, and solvent-cemented joints.

E. Underground,soil, waste, and vent piping shall be one of the following:

1. Service class, hub-and-spigot, cast-iron soil pipe and fittings; gaskets; and compression joints.

2. Solid-wall Schedule 40 PVC pipe, PVC socket fittings, and solvent-cemented joints.

F. Sewage pump or sump pump discharge piping shall be one of the following:

1. Solid-wall Schedule 40 PVC pipe, PVC socket fittings, and solvent-cemented joints.

2. Schedule 40 galvanized steel pipe with screwed galvanized cat iron drainage fittings.

G. Single-Wall, Chemical-Waste Sewerage Piping: Use the following piping materials for each size range:

1. NPS 1-1/2 to NPS 4 (DN 40 to DN 100): CPVC drainage pipe and fittings and solventcemented joints.

H. Underground, Double-Containment, Chemical-Waste Sewerage Piping: Use the following piping materials for each size range:

1. NPS 2 to NPS 12 (DN 50 to DN 300): CPVC double-containment drainage pipe and fittings.

Page 1066 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 4
I. Aboveground Chemical-Waste Piping: Use the following piping materials for each size range:

1. NPS 1-1/2 to NPS 6 (DN 40 to DN 150): CPVC drainage piping and solvent-cemented joints.

J. PVC piping may not be installed in a return air plenum for any of the above piping applications unless piping is completely insulated in fire retardant insulation rated for return air plenums.

3.3 PIPING INSTALLATION
A. Site sanitary sewer piping to a point 5’-0” outside the building is specified in Division 33 Section "Facility Sanitary Sewers."
B. Basic piping installation requirements are specified in Division 22 Section "Common Work Results for Plumbing."
C. Install cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."
D. Install CPVC drainage piping according to ASTM D 2321 and ASTM F 1668.

E. Make changes in direction for soil and waste drainage and vent piping using appropriate branches, bends, and long-sweep bends. Sanitary tees and short-sweep 1/4 bends may be used on vertical stacks if change in direction of flow is from horizontal to vertical. Use long-turn, double Y-branch and 1/8-bend fittings if 2 fixtures are installed back to back or side by side with common drain pipe. Straight tees, elbows, and crosses may be used on vent lines. Do not change direction of flow more than 90 degrees. Use proper size of standard increasers and reducers if pipes of different sizes are connected. Reducing size of drainage piping in direction of flow is prohibited.

F. Lay buried building drainage piping beginning at low point of each system. Install true to grades and alignment indicated, with unbroken continuity of invert. Place hub ends of piping upstream. Install required gaskets according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements. Maintain swab in piping and pull past each joint as completed.

G. Install soil and waste drainage and vent piping at the following minimum slopes, unless otherwise indicated:

1. Sanitary Drains: 2 percent downward in direction of flow for piping NPS 2 and 1 percent downward in direction of flow for piping NPS 3 and larger.

2. Vent Piping: Slope toward vertical fixture vent or toward ventstack.

H. Sleeves are not required for cast-iron soil piping passing through concrete slabs-on-grade if slab is without membrane waterproofing.

I. Install PVC soil and waste drainage and vent piping according to ASTM D 2665 and ASTM D 2321.

J. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction.

Page 1067 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 5
K. Installsleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements forsleeves specified in Division 22 Section "Common Work Results for Plumbing".

L. Install sleeve seals for piping penetrations of concrete walls and slabs. Comply with requirements for sleeve seals specified in Division 22 Section "Common Work Results for Plumbing".

M. Install escutcheons for piping penetrations of walls, ceilings, and floors. Comply with requirements for escutcheons specified in Division 22 Section "Common Work Results for Plumbing".

3.4 VALVE INSTALLATION
A. General-duty valves are specified in Division 22 Section "General-Duty Valves for Plumbing Piping." B. Shutoff Valves: Installshutoff valve on each sewage pump orsump pump discharge.

C. Check Valves: Install swing check valve, downstream from shutoff valve, on each sewage pump or sump pump discharge.

3.5 JOINT CONSTRUCTION
A. Basic piping joint construction requirements are specified in Division 22 Section "Common Work Results for Plumbing."
B. Cast-Iron, Soil-Piping Joints: Make joints according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."

1. Gasketed Joints: Make with rubber gasket matching class of pipe and fittings.

2. HublessJoints: Make with rubber gasket and sleeve or clamp.

C. PVC Nonpressure Piping Joints: Join piping according to ASTM D 2665.

3.6 HANGER AND SUPPORT INSTALLATION
A. Pipe hangers and supports are specified in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment." Install the following:

1. Vertical Piping: MSS Type 8 or Type 42, clamps.

2. Individual, Straight, Horizontal Piping Runs: According to the following:
a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers. b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers. c. Longer Than 100 Feet, if Indicated: MSS Type 49, spring cushion rolls.

3. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls.

Support pipe rolls on trapeze.

4. Base of Vertical Piping: MSS Type 52, spring hangers.

B. Install supports according to Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment."

Page 1068 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 6
C. Support vertical piping and tubing at base and at each floor.

D. Install piping hangers and rod diameters per MSS-SP-69 E. Install supports for vertical cast-iron soil piping every 15 feet.

F. Install supports for vertical steel piping every 15 feet.

G. Installsupportsfor vertical CPVC piping every 48 inches.

H. Install supports for vertical PVC piping every 48 inches.

I. Support piping and tubing according to MSS SP-69 and manufacturer's written instructions.

3.7 CONNECTIONS
A. Connect soil and waste piping to exterior sanitary sewerage piping. Use transition fitting to join dissimilar piping materials.

B. Connect drainage and vent piping to the following:

1. Plumbing Fixtures: Connect drainage piping in sizes indicated, but not smaller than required by plumbing code. Refer to Division 22 Section "Sanitary Waste Piping Specialties."

2. Plumbing Fixtures and Equipment: Connect atmospheric vent piping in sizes indicated, but not smaller than required by authorities having jurisdiction.

3. Plumbing Specialties: Connect drainage and vent piping in sizes indicated, but not smaller than required by plumbing code. Refer to Division 22 Section "Sanitary Waste PipingSpecialties."

4. Equipment: Connect drainage piping or pump discharge piping as indicated. Provide shutoff valve, if indicated, and union for each connection. Use flanges instead of unions for connections NPS 2- 1/2 and larger.

3.8 FIELD QUALITY CONTROL
A. During installation, notify authorities having jurisdiction at least 24 hours before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction.

1. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in and before setting fixtures. Inspections shall be made by FMO plumbing staff prior to closing-in of walls.

2. Final Inspection: Arrange for final inspection by authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.

B. Re-inspection: If authorities having jurisdiction find that piping will not pass test or inspection, make required corrections and arrange for re-inspection.

C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

D. Test sanitary drainage and vent piping according to procedures of authorities having jurisdiction or in absence of published procedures, as follows:

Page 1069 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE AND VENT PIPING 22 1316 - 7

1. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit separate report for each test, complete with diagram of portion of piping tested.

2. Leave uncovered and unconcealed new, altered, extended, or replaced drainage piping until it has been tested and approved. Expose work that was covered or concealed before it was tested.

3. Test Procedure: Test drainage piping on completion of roughing in. Close openings in piping system and fill with water to point of overflow, but not less than 10-foot head of water. From 15 minutes before inspection starts to completion of inspection, water level must not drop. Inspect joints for leaks.

4. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory results are obtained.

5. Prepare reports for tests and required corrective action.

3.9 CLEANING
A. Clean interior of piping. Remove dirt and debris as work progresses.

B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.

C. Place plugs in ends of uncompleted piping at end of day and when work stops.

3.10 PROTECTION
A. Exposed PVC Piping: Protect PVC piping exposed to sunlight with two coats of water-based latex paint.

END OF SECTION 22 1316

Page 1070 of 2548 ends
Page 1071 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE PIPING SPECIALTIES 22 1319- 1
SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes the following sanitary drainage piping specialties:

1. Cleanouts.

2. Floor drains.

3. Through penetration firestop assemblies.

4. Roof flashing assemblies.

5. Miscellaneous sanitary drainage piping specialties.

6. Flashing materials.

1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, and accessories for grease interceptors.

1.4 QUALITY ASSURANCE
A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency.

PART 2 - PRODUCTS

2.1 CLEANOUTS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Josam Company.

2. Smith, Jay R. Mfg. Co.

3. Tyler Pipe; Wade Div.

4. Zurn Plumbing Products Group.

B. Exposed Horizontal Cleanouts, HCO:

1. Standard: ASME A112.36.2M for cast iron for cleanout test tee.

Page 1072 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE PIPING SPECIALTIES 22 1319- 2

2. Size: Same as connected drainage piping

3. Body Material: Hubless, cast-iron soil pipe test tee as required matching connected piping.

C. Floor Cleanouts, FCO:

1. Standard: ASME A112.36.2M for adjustable housing cleanout.

2. Size: Same as connected branch.

3. Coated cast iron internal gasketed ABS cleanout plug and adjustable ABS housing.

4. Medium-duty scoriated secured round satin finish Nikaloy top.

D. Wall Cleanouts, WCO:

1. Standard: ASME A112.36.2M. Include wall access.

2. Size: Same as connected drainage piping.

3. Round stainless steel wall access cover with screw and no-hub cleanout.

2.2 FLOOR DRAINS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Josam Company.

2. Smith, Jay R. Mfg. Co.

3. Tyler Pipe; Wade Div.

4. Zurn Plumbing Products Group.

B. Floor Drains, FD-1:

1. Standard: ASME A112.6.3.

2. Body Material: Coated cast iron.

3. Bottom Outlet with Seepage & Anchor Flange with clamping device.

4. Strainer: 6” Round Nickel bronze, Light Duty.

C. Vent Caps:

1. Description: Cast-iron body with threaded or hub inlet and vandal-proof design. Include vented hood and setscrews to secure to vent pipe.

Page 1073 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE PIPING SPECIALTIES 22 1319- 3
PART 3 - EXECUTION

3.1 INSTALLATION
A. Refer to Division 22 Section "Common Work Results for Plumbing" for piping joining materials, joint construction, and basic installation requirements.

B. Install cleanouts in aboveground piping and building drain piping according to the following, unless otherwise indicated:

1. Size same as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless larger cleanout is indicated.

2. Locate at each change in direction of piping greater than 45 degrees.

3. Locate at minimum intervals of 100 feet.

4. Locate at base of each verticalsoil and waste stack.

C. For floor cleanouts for piping below floors, install cleanout with top flush with finished floor.

D. For cleanouts located in concealed piping, install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall.

E. Install floor drains at low points of surface areas to be drained. Set grates of drains flush with finished floor, unless otherwise indicated.

1. Position floor drainsfor easy access and maintenance.

2. Set floor drains below elevation of surrounding finished floor to allow floor drainage. Set with grates depressed according to the following drainage area radii:
a. Radius, 30 Inches or Less: Equivalent to 1 percent slope, but not less than 1/4- inch total depression.
b. Radius, 30 to 60 Inches: Equivalent to 1 percent slope. c. Radius, 60 Inches or Larger: Equivalent to 1 percent slope, but not greater than 1- inch total depression.

3. Install floor-drain flashing collar or flange so no leakage occurs between drain and adjoining flooring. Maintain integrity of waterproof membranes where penetrated.

4. Install individual traps for floor drains connected to sanitary building drain, unless otherwise indicated.

F. Install roof flashing assemblies on sanitary stack vents and ventstacks that extend through roof.

G. Install flashing fittings on sanitary stack vents and vent stacks that extend through roof.

H. Install floor-drain, trap-seal primer fittings on inlet to floor drains that require trap-seal primer connection.

1. Exception: Fitting may be omitted if trap hastrap-seal primer connection.

I. Install air-gap fittings on draining-type backflow preventers and on indirect-waste piping discharge into sanitary drainage system.

Page 1074 of 2548 ends

CIB 689- Clark Building Renovations
SANITARY WASTE PIPING SPECIALTIES 22 1319- 4

3.2 CONNECTIONS
A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to equipment to allow service and maintenance.

3.3 FLASHING INSTALLATION
A. Fabricate flashing from single piece unless large pans, sumps, or other drainage shapes are required.

Join flashing according to the following if required:

1. Lead Sheets: Burn joints of lead sheets 6.0-lb/sq. ft., 0.0938-inch thickness or thicker. Solder joints of lead sheets 4.0-lb/sq. ft., 0.0625-inch thickness or thinner.

B. Install sheet flashing on pipes, sleeves, and specialties passing through or embedded in floors and roofs with waterproof membrane.

1. Pipe Flashing: Sleeve type, matching pipe size, with minimum length of 10 inches, and skirt or flange extending at least 8 inches around pipe.

2. Sleeve Flashing: Flat sheet, with skirt or flange extending at least 8 inches around sleeve.

3. Embedded Specialty Flashing: Flat sheet, with skirt or flange extending at least 8 inches around specialty.

C. Set flashing on floors and roofs in solid coating of bituminous cement.

D. Secure flashing into sleeve and specialty clamping ring or device.

E. Install flashing for piping passing through roofs with counterflashing or commercially made flashing fittings, according to applicable Division 07 Section.

F. Extend flashing up vent pipe passing through roofs and turn down into pipe, or secure flashing into castiron sleeve having calking recess.

3.4 LABELING AND IDENTIFYING
A. Equipment Nameplates and Signs: Install engraved plastic-laminate equipment nameplate or sign on or near each grease interceptor.

B. Distinguish among multiple units, inform operator of operational requirements, indicate safety and emergency precautions, and warn of hazards and improper operations, in addition to identifying unit.

Nameplates and signs are specified in Division 22 Section "Identification for Plumbing Piping and Equipment."

3.5 PROTECTION
A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.

Page 1075 of 2548 ends

CIB 689- Clark Building Renovations
ELECTRIC, DOMESTIC WATER HEATERS 22 3300 - 1
SECTION 22 3300 - ELECTRIC, DOMESTIC WATER HEATERS
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Commercial, electric, storage, domestic water heaters.

2. Thermostat-control, electric, tank-less, domestic water heaters.

3. Domestic-water heater accessories.

1.3 SUBMITTALS
A. Product Data: For each type and size of domestic-water heater indicated.

B. LEED Submittal:

1. Product Data for Prerequisite EA 2: Documentation indicating that units comply with ASHRAE/IESNA 90.1, Section 7, "Service Water Heating."
C. Shop Drawings:

1. Wiring Diagrams: For power,signal, and control wiring.

D. Domestic Water Heater Labeling: Certified and labeled by testing agency acceptable to authorities having jurisdiction.

E. Source quality-control reports.

F. Field quality-control reports.

G. Operation and maintenance data.

H. Warranty: Sample of special warranty.

1.4 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. ASHRAE/IESNA 90.1 Compliance: Applicable requirementsin ASHRAE/IESNA 90.1.

Page 1076 of 2548 ends

CIB 689- Clark Building Renovations
ELECTRIC, DOMESTIC WATER HEATERS 22 3300 - 2
C. ASME Compliance: Where ASME-code construction is indicated, fabricate and label commercial, domestic water heater storage tanks to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

D. NSF Compliance: Fabricate and label equipment components that will be in contact with potable water to comply with NSF 61, "Drinking Water System Components - Health Effects."

1.5 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of electric, domestic water heaters that fail in materials or workmanship within specified warranty period.

1. Warranty Periods: From date of Substantial Completion. a. Commercial, Electric, Storage, Domestic Water Heaters:
1) Storage Tank: Three years.
2) Controls and Other Components: Three years.
b. Electric, Tank-less, Domestic Water Heaters: One year. c. Compression Tanks: Five years.

PART 2 - PRODUCTS

2.1 COMMERCIAL, ELECTRIC, DOMESTIC WATER HEATERS
A. Commercial, Electric, Storage, Domestic Water Heaters:

1. Basis-of-Design Product: Subject to compliance with requirements, provide the product indicated on drawings or comparable product by one of the following:
a. A. O. Smith.
b. Lochinvar Corporation.
c. PVI Industries, LLC.
d. State Industries.

2. Standard: UL 1453.

3. Storage-Tank Construction: ASME-code, steel vertical arrangement. a. Tappings: Factory fabricated of materials compatible with tank and piping connections. Attach tappings to tank before testing.
1) NPS 2 and Smaller: Threaded ends according to ASME B1.20.1. 2) NPS 2-1/2 and Larger: Flanged ends according to ASME B16.5 for steel and stainless-steel flanges, and according to ASME B16.24 for copper and copper-alloy flanges.
b. Pressure Rating: 150 psig.
c. Interior Finish: Comply with NSF 61 barrier materials for potable-water tank linings, including extending lining material into tappings.

Page 1077 of 2548 ends

CIB 689- Clark Building Renovations
ELECTRIC, DOMESTIC WATER HEATERS 22 3300 - 3

4. Factory-Installed Storage-Tank Appurtenances:
a. Anode Rod: Replaceable magnesium.
b. Drain Valve: Corrosion-resistant metal complying with ASSE 1005. c. Insulation: Comply with ASHRAE/IESNA 90.1.
d. Jacket: Steel with enameled finish.
e. Heating Elements: Electric, screw-in or bolt-on immersion type arranged in multiples of three.
f. Temperature Control: Adjustable thermostat.
g. Safety Controls: High-temperature-limit and low-water cutoff devices or systems. h. Relief Valves: ASME rated and stamped for combination temperature-and- pressure relief valves. Include one or more relief valves with total relieving capacity at least as great as heat input, and include pressure setting less than domestic-water heater working-pressure rating. Select one relief valve with sensing element that extends into storage tank.

5. Special Requirements: NSF 5 construction.

6. Capacity and Characteristics: Asindicated on the drawings.

7. Temperature Setting: 140 deg F.

2.2 SOURCE QUALITY CONTROL
A. Factory Tests: Test and inspect domestic-water heaters specified to be ASME-code construction, according to ASME Boiler and Pressure Vessel Code.

B. Hydrostatically test domestic water heaters to minimum of one and one-half times pressure rating before shipment.

C. Electric, domestic-water heaters will be considered defective if they do not pass tests and inspections.

Comply with requirements in Division 01 Section "Quality Requirements" for retesting and reinspecting requirements and Division 01 Section "Execution" for requirements for correcting the Work.

D. Prepare test and inspection reports.

Page 1078 of 2548 ends

CIB 689- Clark Building Renovations
ELECTRIC, DOMESTIC WATER HEATERS 22 3300 - 4
PART 3 - EXECUTION

3.1 DOMESTIC WATER HEATER INSTALLATION
A. Commercial, Electric, Domestic Water Heater Mounting: Install commercial, electric, domestic- water heaters on concrete base. Comply with requirements for concrete bases specified in Division 03 Section "Cast-in-Place Concrete”.

1. Exception: Omit concrete bases for commercial, electric, domestic water heaters if installation on stand, bracket, suspended platform, or directly on floor is indicated on the drawings.

2. Maintain manufacturer's recommended clearances.

3. Arrange unitsso controls and devicesthat require servicing are accessible.

4. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete floor.

5. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

6. Install anchor bolts to elevations required for proper attachment to supported equipment.

7. Anchor domestic-water heaters to substrate.

B. Electric, Tank-less, Domestic Water Heater Mounting: Install electric, tank-less, domestic water heaters 18 inches on wall bracket.

1. Maintain manufacturer's recommended clearances.

2. Arrange unitsso controls and devicesthat require servicing are accessible.

3. Place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

4. Install anchor bolts to elevations required for proper attachment to supported equipment.

5. Anchor domestic-water heaters to substrate.

C. Install electric, domestic water heaters level and plumb, according to layout drawings, original design, and referenced standards. Maintain manufacturer's recommended clearances. Arrange units so controls and devices needing service are accessible.

1. Install shutoff valves on domestic water supply piping to domestic water heaters and on domestichot-water outlet piping. Comply with requirements for shutoff valves specified in Division 22 Section "General-Duty Valves for Plumbing Piping."
D. Install combination temperature-and-pressure relief valves in top portion of storage tanks. Use relief valves with sensing elements that extend into tanks. Extend commercial-water-heater relief-valve outlet, with drain piping same as domestic-water piping in continuous downward pitch, and discharge by positive air gap onto closest floor drain.

E. Install water-heater drain piping as indirect waste to spill by positive air gap into open drains or over floor drains. Install hose-end drain valves at low points in water piping for electric, domestic-water heaters that do not have tank drains. Comply with requirements for hose-end drain valves specified in Division 22 Section "Domestic Water Piping Specialties."
F. Install thermometers on outlet piping of electric, domestic water heaters. Comply with requirements for thermometers specified in Division 22 Section "Meters and Gages for Plumbing Piping."

Page 1079 of 2548 ends

CIB 689- Clark Building Renovations
ELECTRIC, DOMESTIC WATER HEATERS 22 3300 - 5
G. Install piping-type heat traps on inlet and outlet piping of electric, domestic-water heater storage tanks without integral or fitting-type heat traps.

H. Fill electric, domestic water heaters with water.

I. Charge domestic water compression tanks with air.

3.2 CONNECTIONS
A. Comply with requirements for piping specified in Division 22 Section "Domestic Water Piping." Drawings indicate general arrangement of piping, fittings, and specialties.

B. Where installing piping adjacent to electric, domestic-water heaters, allow space for service and maintenance of water heaters. Arrange piping for easy removal of domestic water heaters.

3.3 IDENTIFICATION
A. Identify system components. Comply with requirements for identification specified in Division 22 Section "Identification for Plumbing Piping and Equipment."

3.4 FIELD QUALITY CONTROL
A. Perform tests and inspections.

1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.

2. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.

3. Operational Test: After electrical circuitry has been energized, start units to confirm proper operation.

4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

B. Electric, domestic-water heaters will be considered defective if they do not pass tests and inspections.

Comply with requirements in Division 01 Section "Quality Requirements" for retesting and reinspecting requirements and Division 01 Section "Execution" for requirements for correcting the Work.

C. Prepare test and inspection reports.

END OF SECTION 22 3300

Page 1080 of 2548 ends
Page 1081 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 1
SECTION 22 4000 - PLUMBING FIXTURES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includesthe following:

1. Faucets for lavatories and showers.

2. Flushometers for water closets and urinals.

3. Toiletseats.

4. Protective shielding guards.

5. Fixture supports.

6. Water closets.

7. Urinals.

8. Lavatories.

9. Sinks and sink faucets.

10. Service sinks and faucets.

11. Mop sinks and faucets.

B. Related Sections include the following:

1. Section 22 1118 "Domestic Water Distribution System."

2. Section 22 2114 "Plumbing Specialties."

1.3 DEFINITIONS
A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. Accessible Fixture: Plumbing fixture that can be approached, entered, and used by people with disabilities.

C. FRP: Fiberglass-reinforced plastic.

D. PMMA: Polymethyl methacrylate (acrylic) plastic.

E. PVC: Polyvinyl chloride plastic.

F. Solid Surface: Nonporous, homogeneous, cast-polymer-plastic material with heat-, impact-, scratch-, and stain-resistance qualities.

Page 1082 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 2

1.4 SUBMITTALS
A. Product Data: For each type of product indicated, and including fixture/item dimensions and rough-in dimensions.

C. Shop Drawings: Diagram power, signal, and control wiring, and for fixture supports and carriers.

D. Operation and maintenance data.

E. At closeout, Northwestern University Maintenance Requirement Forms, see Division 01 for more information.

1.5 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Regulatory Requirements: Comply with requirements in ICC A117.1, "Accessible and Usable Buildings and Facilities"; Public Law 90-480, "Architectural Barriers Act"; and Public Law 101- 336, "Americans with Disabilities Act"; for plumbing fixtures for people with disabilities.

C. Regulatory Requirements: Comply with requirements in Public Law 102-486, "Energy Policy Act," about water flow and consumption rates for plumbing fixtures.

D. Comply with California Health and Safety Code 116875 (AB 1953) - 2010, for 25% low lead content of piping, pipe fittings, and faucets for water intended for human consumption, and NSF/ANSI Standard 61, including Annex G-2010 - Drinking Water System Components - Low Lead Content Requirement.

E. Comply with NSF/ANSI 372 - Low Lead Content Verification Requirement F. Select combinations of fixtures and trim, faucets, fittings, and other components that are compatible.

G. Comply with the following applicable standards and other requirements specified for plumbing fixtures:

1. Enameled, Cast-Iron Fixtures: ASME A112.19.1M.

2. Stainless-Steel Sinks: ASME A112.19.3.

3. Vitreous-China Fixtures: ASME A112.19.2M.

4. Water-Closet, Flush Valve, Tank Trim: ASME A112.19.5.

Page 1083 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 3

5. Water-Closet, Flushometer Tank Trim: ASSE 1037.

H. Comply with the following applicable standards and other requirements specified for lavatory and sink faucets:

1. Backflow Protection Devicesfor Faucets with Side Spray: ASME A112.18.3M.

2. Backflow Protection Devicesfor Faucets with Hose-Thread Outlet: ASME A112.18.3M.

3. Diverter Valvesfor Faucets with Hose Spray: ASSE 1025.

4. Faucets: ASME A112.18.1.

5. Hose-Connection Vacuum Breakers: ASSE 1011.

6. Hose-Coupling Threads: ASME B1.20.7.

7. Integral, Atmospheric Vacuum Breakers: ASSE 1001.

8. NSF Potable-Water Materials: NSF 61.

9. Pipe Threads: ASME B1.20.1.

10. Sensor-Actuated Faucets and Electrical Devices: UL 1951.

11. Supply Fittings: ASME A112.18.1.

12. Brass Waste Fittings: ASME A112.18.2.

I. Comply with the following applicable standards and other requirements specified for shower faucets:

1. Backflow Protection Devices for Hand-Held Showers: ASME A112.18.3M.

2. Combination, Pressure-Equalizing and Thermostatic-Control Antiscald Faucets:

ASSE 1016.

3. Faucets: ASME A112.18.1.

4. Hand-Held Showers: ASSE 1014.

5. High-Temperature-Limit Controls for Thermal-Shock-Preventing Devices: ASTM F 445.

6. Hose-Coupling Threads: ASME B1.20.7.

7. Manual-Control Antiscald Faucets: ASTM F 444.

8. Pipe Threads: ASME B1.20.1.

9. Pressure-Equalizing-Control Antiscald Faucets: ASTM F 444 and ASSE 1016.

10. Sensor-Actuated Faucets and Electrical Devices: UL 1951.

11. Thermostatic-Control Antiscald Faucets: ASTM F 444 and ASSE 1016.

J. Comply with the following applicable standards and other requirements specified for miscellaneousfittings:

1. Atmospheric Vacuum Breakers: ASSE 1001.

2. Brass and Copper Supplies: ASME A112.18.1.

3. Manual-Operation Flushometers: ASSE 1037.

4. Plastic Tubular Fittings: ASTM F 409.

5. Brass Waste Fittings: ASME A112.18.2.

6. Sensor-Operation Flushometers: ASSE 1037 and UL 1951.

K. Comply with the following applicable standards and other requirements specified for miscellaneouscomponents:

1. Flexible Water Connectors: ASME A112.18.6.

2. Hose-Coupling Threads: ASME B1.20.7.

3. Off-Floor Fixture Supports: ASME A112.6.1M.

4. Pipe Threads: ASME B1.20.1.

5. Plastic Toilet Seats: ANSI Z124.5-2013.

6. Supply and Drain Protective Shielding Guards: ICC A117.1.

Page 1084 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 4

1.6 SPECIAL WARRANTIES
A. Five (5) years, see Division 01 for more information.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. For flushing fixtures, lavatories, showers, service sinks, and mop sinks specified below, subject to compliance with requirements, provide the products indicated in the Fixture Schedule on the drawings, or a comparable product by one of the following:

1. Kohler (preferred).

2. American Standard (acceptable alternate).

B. For Non-Lab duty faucets, subject to compliance with requirements, provide the products indicated in the Fixture Schedule on the drawings, or a comparable product by one of the following:

1. Kohler.

2. Moen.

3. Sloan Valve.

C. For water closet and urinal flushometers, subject to compliance with requirements, provide the products indicated in the Fixture Schedule on the drawings, or a comparable product by one of the following:

1. Moen (preferred).

2. Sloan Valve.

2.2 LAVATORY FAUCETS
A. Lavatory Faucets:

1. Description: Single-control manual mixing valve. Include hot- and cold-water indicators; coordinate faucet inlets with supplies and fixture holes; coordinate outlet with spout and fixture receptor. a. Body Material: Commercial, solid brass.
b. Finish: Polished chrome plate.
c. Maximum Flow Rate: 0.5 gpm.
d. Centers: 4 inches.
e. Mounting: Deck, exposed.
f. Valve Handle: Lever.
g. Inlets: NPS 3/8 tubing, with NPS 1/2 male adaptor.
h. Spout: Rigid type.
i. Spout Outlet: Spray, 0.5 gpm.
j. Operation: Non-compression, manual.
k. Drain: Grid.

Page 1085 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 5
****OR****
B. Lavatory Faucets:

1. Description: ADA compliant, electrically powered, sensor operated faucet. Coordinate faucet inlets with supplies and fixture holes; coordinate outlet with spout and fixture receptor. a. Body Material: Commercial, solid brass.
b. Finish: Polished chrome plate.
c. Maximum Flow Rate: 0.5 gpm.
d. Centers: 4 inches.
e. Mounting: Deck, exposed.
f. Inlet(s): NPS 3/8 tubing, with NPS 1/2 male adaptor. g. Spout: Rigid type.
h. Spout Outlet: Laminar flow, 0.5 gpm.
i. Operation: sensor actuator, hardwired.
j. Drain: Grid.

C. Lavatory Faucets:

1. Description: Single-control manual mixing valve. Include hot and cold water indicators; coordinate faucet inlets with supplies and fixture holes; coordinate outlet with spout and fixture receptor. a. Body Material: Commercial, solid brass.
b. Finish: Polished chrome plate.
c. Maximum Flow Rate: 0.5 gpm.
d. Centers: 8 inches.
e. Mounting: Deck, exposed.
f. Valve Handle: Lever.
g. Inlets: NPS 3/8 tubing, with NPS 1/2 male adaptor.
h. Spout: Swing gooseneck, with dimensions to best serve lavatory use in each location.
i. Spout Outlet: Laminar flow, 0.5 gpm.
j. Operation: Non-compression, manual.
k. Drain: Grid.
****OR****
D. Lavatory Faucets:

1. Description: ADA compliant, electrically powered, sensor operated faucet. Coordinate faucet inlets with supplies and fixture holes; coordinate outlet with spout and fixture receptor. a. Body Material: Commercial, solid brass.
b. Finish: Polished chrome plate.
c. Maximum Flow Rate: 0.5 gpm.
d. Centers: 8 inches.
e. Mounting: Deck, exposed.
f. Inlet(s): NPS 3/8 tubing, with NPS 1/2 male adaptor. g. Spout: Swing gooseneck, with dimensions to best serve lavatory use in each location Rigid type.

Page 1086 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 6
h. Spout Outlet: Laminar flow, 0.5 gpm.
i. Operation: sensor actuator, hardwired.
j. Drain: Grid.

2.3 FLUSHOMETERS
A. Water Closet Flushometers:

1. Description: Exposed, electrically powered, sensor operated, piston type flushometer for watercloset-type fixture. Include brass body with corrosion-resistant internal components, control stop with check valve, vacuum breaker, copper or brass tubing, and polished chrome-plated finish on exposed parts.
a. Internal Design: Piston operation.
b. Style: Exposed.
c. Inlet Size: NPS 1.
d. Trip Mechanism: Battery powered operated sensor actuator. e. Consumption: 1.6 [1.28] gal/flush.
f. Tailpiece Size: NPS 1-1/2 and standard length to top of bowl. g. Manual override button.

B. Flushometers:

1. Description: Exposed, electrically powered, sensor operated, piston type flushometer for urinaltype fixture. Include brass body with corrosion-resistant internal components, control stop with check valve, vacuum breaker, copper or brass tubing, and polished chrome-plated finish on exposed parts.
a. Internal Design: Piston operation.
b. Style: Exposed.
c. Inlet Size: NPS 3/4.
d. Trip Mechanism: Battery powered operated sensor actuator. e. Consumption: 0.5 [0.125] gal/flush.
f. Tailpiece Size: NPS 3/4 and standard length to top of urinal. g. Manual override button.

2.4 TOILET SEATS
A. Toilet Seats:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. American Standard.
b. Bemis Manufacturing Company, Duraguard (Basis of Design). c. Church Seats.
d. Olsonite Corp.

Page 1087 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 7

2. Description: Toilet seat for water-closet-type fixture, heavy duty commercial. a. Material: Molded, solid plastic with antimicrobial agent. b. Configuration: Open front without cover.
c. Size: To fit bowl.
d. Hinge Type: Self-sustaining.
e. Class: Heavy-duty commercial.
f. Color: White.
g. Fasteners: 300 seriesstainless steel.

2.5 PROTECTIVE SHIELDING GUARDS
A. Protective Shielding Pipe Covers:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Plumberex Specialty Products Inc.
b. TRUEBRO, Inc.
c. Zurn Plumbing Products Group; Tubular Brass Plumbing Products Operation.

2. Description: Manufactured plastic wraps for covering plumbing fixture hot- and cold- water supplies and trap and drain piping. Comply with Americans with Disabilities Act (ADA) requirements.

2.6 FIXTURE SUPPORTS
A. Manufacturers for Water Closet Supports: Subject to compliance with requirements, provide products by one of the following:

1. Josam Company

2. Smith, Jay R. Mfg. Co.

3. Tyler Pipe; Wade Div.

4. Zurn Plumbing Products Group; Specification Drainage Operation.

B. Water-Closet Supports:

1. Description: Combination carrier designed for accessible or standard mounting as indicated on drawings, for height of wall-mounting, water-closet-type fixture. Include single or double, vertical or horizontal, hub-and-spigot or hubless waste fitting as required for piping arrangement; faceplates; couplings with gaskets; feet; and fixture bolts and hardware matching fixture. Include additional extension coupling, faceplate, and feet for installation in wide pipe space. Carrier must meet the 500 lb. minimum load bearing requirements of ASME A112.19.2-2005/CSA B45.1-05.

C. Urinal Supports:

1. Description: Wall plate.

D. Lavatory Supports:

1. Description: Wall plate.

Page 1088 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 8
E. Water Cooler Supports:

1. Wall plates.

2.7 WATER CLOSETS
A. Water Closets:

1. Description: Accessible, wall-mounting, back-outlet, vitreous-china fixture designed for flushometer valve operation.
a. Bowl Type: Elongated with siphon-jet design. Include bolt caps matching fixture. b. Surface: Antimicrobial surface which inhibits the growth of stain and odor causing bacteria.
c. Height: Standard.
d. Design Consumption: 1.6 [1.28] gal/flush.
e. Color: White.
f. Basis of Design: Kohler K-4325-0 "Kingston" model.

2. Description: Accessible, floor-mounting, bottom outlet, vitreous-china fixture designed for flushometer valve operation.
a. Bowl Type: Elongated with siphon-jet design. Include bolt caps matching fixture. b. Surface: Antimicrobial surface which inhibits the growth of stain and odor causing bacteria.
c. Height: Standard.
d. Design Consumption: 1.6 [1.28] gal/flush.
e. Color: White.
f. Basis of Design: Kohler K-4302-0 "Highcrest" model

3. Description: Accessible, floor-mounting, tank type, bottom outlet, vitreous-china fixture. a. Bowl Type: Elongated with siphon-jet design. Include bolt caps matching fixture. b. Surface: Antimicrobial surface which inhibits the growth of stain and odor causing bacteria.
c. Height: Standard.
d. Design Consumption: 1.6 [1.28] gal/flush.
e. Color: White.
f. Basis of Design: Kohler K-3887-0 "Cimarron" model.

2.8 URINALS
A. Urinals:

1. Description: Accessible, wall-mounting, back-outlet, vitreous-china fixture designed for flushometer valve operation.
a. Type: Siphon jet.
b. Strainer or Trapway: Integral caststrainer with integral trap. c. Design Consumption: 0.5 gal/flush.
d. Color: White.
e. Supply Spud Size: ¾ inch.
f. Outlet Size: 2 inch.

Page 1089 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 9
g. Height: 24 inch.
h. Basis of Design: Kohler Dexter K-5016-ET-0.

2.9 LAVATORIES
A. Lavatories:

1. Description: Accessible, wall mounted, vitreous-china fixture. a. Type: Wall mounted with front overflow and backsplash. b. Size (nominal): XX [20] by XX [18] inches.
c. Faucet Hole Punching: [4 inch centers][8 inch centers]. d. Color: White.
e. Supplies: 3/8 inch chrome-plated copper with stops.
f. Drain: Grid
g. Drain Piping: 1-1/4 by 1-1/2 inch chrome-plated, cast-brass P-trap; 1-1/2 inch,

0.045-inch- thick tubular brass waste to wall; and wall escutcheon. h. Fixture Support: Required.
i. Protective Shielding Guards: Required.
j. Basis of Design: Kohler K-2030-0 "Greenwich" for 8" centers, Kohler K-2032-0 "Greenwich" for 4" centers.

B. Lavatories, L-2:

1. Description: Accessible, countertop, vitreous-china fixture. a. Type: Self-rimming countertop type with front overflow. b. Size (nominal): XX [20] by xx [18] inches.
c. Faucet Hole Punching: [4 inch centers][8 inch centers]. d. Color: White.
e. Supplies: NPS 3/8 chrome-plated copper with stops.
f. Drain: Grid.
g. Drain Piping: 1-1/4 x 1-1/2 inch chrome-plated, cast-brass P-trap; 1-1/2 inch,

0.045-inch- thick tubular brass waste to wall; and wall escutcheon. h. Protective Shielding Guards: Required.
i. Basis of Design: Kohler K-2337-8 "Memoirs" for 8" centers, Kohler K-2337- "Memoirs" for 4" centers.

2.10 SINKS
A. Sinks:

1. Subject to compliance with requirements, provide the product indicated in the Fixture Schedule on the drawings or a comparable product by one of the following:
a. Elkay.
b. Just Manufacturing Company.
c. Moen Commercial

2. Description: One or Two-bowl, as indicated below or as scheduled, counter-mounted, self rimming stainless-steel sink.

Page 1090 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 10
a. Overall Dimensions: (S-1)17 x16 inch single bowl, and/or (S-2) 43 x22 inch double bowl (S-2).
b. Metal Thickness: 18 gauge Type 304 stainless steel.
c. Bowl Dimensions: (S-1) 14 x10 x 6½ inches and (S-2) 19 x16 x 7 5/8 inches. d. Drain: 3-1/2-inch crumb cup strainers centered in bowls. e. Sink Faucet: Polished chrome plated body, gooseneck swing spout, lever handles, ADA design, and 1.5 GPM aerator.
f. Faucet Hole Punching: [4 inch centers][8 inch centers] [other- specify]. g. Supplies: ½ inch chrome-plated copper with stops.
h. Drain Piping: 1½ inch chrome-plated, cast-brass P-trap; 0.045 inch thick tubular brass waste to wall, and wall escutcheon.

2.11 SERVICE SINKS
A. Service Sinks, SS:

1. Description: Trap-standard- and wall-mounting, enameled, cast-iron fixture with roll-rim two faucet holes in back and rim guard on front and sides.
a. Size: 22 by 18 inches.
b. Color: White.
c. Faucet: Sink mount utility type with lever handles, bucket hook, stops, vacuum breaker, spout support, and polished chrome finish. Chicago Faucet (preferred), or approved equal. No threads allowed spouts.
d. Drain: Grid with NPS 3 outlet.
e. Trap Standard: NPS 3 enameled, cast iron with cleanout and floor flange. f. Fixture Support: Wall hanger furnished with sink.

Page 1091 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 11
PART 3 - EXECUTION

3.1 INSTALLATION
A. Assemble plumbing fixtures, trim, fittings, and other components according to manufacturers' written instructions.

B. Install off-floor supports, affixed to building substrate, for wall-mounting fixtures.

1. Use carrier supports with waste fitting and seal for back-outlet fixtures.

2. Use carrier supports without waste fitting for fixtures with tubular waste piping.

3. Use chair-type carrier supports with rectangular steel uprights for accessible fixtures.

C. Install back-outlet, wall-mounting fixtures onto waste fitting seals and attach to supports.

D. Install floor-mounting fixtures on closet flanges or other attachments to piping or building substrate.

E. Install wall-mounting fixtures with tubular waste piping attached to supports.

F. Install fixtures level and plumb according to roughing-in drawings.

G. Install water-supply piping with stop on each supply to each fixture to be connected to water distribution piping. Attach supplies to supports or substrate within pipe spaces behind fixtures. Install stops in locations where they can be easily reached for operation.

H. Install trap and tubular waste piping on drain outlet of each fixture to be directly connected to sanitary drainage system.

I. Install tubular waste piping on drain outlet of each fixture to be indirectly connected to drainage system.

J. Install flushometer valves for accessible water closets and urinals with handle mounted on wide side of compartment. Install other actuators in locations that are easy for people with disabilities to reach.

K. Install tanks for accessible, tank-type water closets with lever handle mounted on wide side of compartment.

L. Install toiletseats on water closets.

M. Install faucet-spout fittings with specified flow rates and patterns in faucet spouts if faucets are not available with required rates and patterns. Include adapters if required.

N. Install water-supply flow-control fittings with specified flow rates in fixture supplies at stop valves.

O. Install faucet flow-control fittings with specified flow rates and patterns in faucet spouts if faucets are not available with required rates and patterns. Include adapters if required.

P. Installshower flow-control fittings with specified maximum flow ratesin shower arms.

Q. Install traps on fixture outlets.

Page 1092 of 2548 ends
Page 1093 of 2548 ends

CIB 689- Clark Building Renovations
PLUMBING FIXTURES 22 4000 - 1

1. Exception: Omit trap on fixtures with integral traps.

2. Exception: Omit trap on indirect wastes, unless otherwise indicated.

R. Install escutcheons at piping wall and ceiling penetrations in exposed, finished locations and within cabinets and millwork. Use deep-pattern escutcheons if required to conceal protruding fittings. Escutcheons are specified in Division 22 Section "Escutcheons for Plumbing Piping." S. Seal joints between fixtures and walls, floors, and countertops using sanitary-type, one-part, mildewresistant silicone sealant. Match sealant color to fixture color. Sealants are specified in Division 07 Section "Joint Sealants."

3.2 CONNECTIONS
A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Connect fixtures with water supplies, stops, and risers, and with traps, soil, waste, and vent piping.

Use size fittings required to match fixtures.

C. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical Systems." D. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."

3.3 FIELD QUALITY CONTROL
A. Verify that installed plumbing fixtures are categories and types specified for locations where installed.

B. Check that plumbing fixtures are complete with trim, faucets, fittings, and other specified components.

C. Inspect installed plumbing fixturesfor damage. Replace damaged fixtures and components.

D. Test installed fixtures after water systems are pressurized for proper operation. Replace malfunctioning fixtures and components, then retest. Repeat procedure until units operate properly.

E. Install fresh batteries in sensor-operated mechanisms.

3.4 PROTECTION
A. Provide protective covering for installed fixtures and fittings.

B. Do not allow use of plumbing fixtures for temporary facilities unless approved in writing by Owner.

END OF SECTION 22 4000

Page 1094 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 23 0517 - 1
SECTION 23 0517 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Sleeves.

2. Sleeve-sealsystems.

3. Sleeve-seal fittings.

4. Grout.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 SLEEVES
A. Cast-Iron Wall Pipes: Cast or fabricated of cast or ductile iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.

B. Galvanized-Steel Wall Pipes: ASTM A 53/A 53M, Schedule 40, with plain ends and welded steel collar; zinc coated.

C. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, zinc coated, with plain ends.

D. Galvanized-Steel-Sheet Sleeves: 0.0239-inch (0.6-mm) minimum thickness; round tube closed with welded longitudinal joint.

E. Molded-PE or -PP Sleeves: Removable, tapered-cup shaped, and smooth outer surface with nailing flange for attaching to wooden forms.

2.2 SLEEVE-SEAL SYSTEMS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Page 1095 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 23 0517 - 2

1. Advance Products & Systems, Inc.

2. CALPICO, Inc.

3. Metraflex Company (The).

4. Pipeline Seal and Insulator, Inc.

5. Proco Products, Inc.

B. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.

1. Sealing Elements: EPDM-rubber or NBR interlocking links shaped to fit surface of pipe.

Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Carbon steel or Stainless steel.

3. Connecting Bolts and Nuts: Carbon steel, with corrosion-resistant coating, or Stainless steel of length required to secure pressure plates to sealing elements.

2.3 SLEEVE-SEAL FITTINGS
A. Manufacturers: Subject to compliance with requirements, provide products by the following:

1. Presealed Systems.

B. Description: Manufactured plastic, sleeve-type, waterstop assembly made for imbedding in concrete slab or wall. Unit has plastic or rubber waterstop collar with center opening to match piping OD.

2.4 GROUT
A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION
A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1- inch (25-mm) annular clear space between piping and concrete slabs and walls.

C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.

1. Permanent sleeves are not required for holes in slabs formed by molded-PE or -PP sleeves.

Page 1096 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 23 0517 - 3

2. Cutsleeves to length for mounting flush with both surfaces. a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches (50 mm) above finished floor level.

3. Using sealant, seal the space outside of sleeves in slabs and walls without sleeve-seal system.

D. Install sleeves for pipes passing through interior partitions.

1. Cutsleeves to length for mounting flush with both surfaces.

2. Install sleeves that are large enough to provide 1/4-inch (6.4-mm) annular clear space between sleeve and pipe or pipe insulation.

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint. Comply with requirements for sealants specified in Section 079200 "Joint Sealants."
E. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestopping specified in Section 078413 "Penetration Firestopping."

3.2 SLEEVE-SEAL-SYSTEM INSTALLATION
A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.

B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.3 SLEEVE-SEAL-FITTINGINSTALLATION
A. Installsleeve-seal fittings in new walls and slabs asthey are constructed.

B. Assemble fitting components of length to be flush with both surfaces of concrete slabs and walls. Position waterstop flange to be centered in concrete slab or wall.

C. Secure nailing flangesto concrete forms.

D. Using grout, seal the space around outside of sleeve-seal fittings.

3.4 SLEEVE AND SLEEVE-SEAL SCHEDULE
A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Exterior Concrete Walls above Grade:
a. Piping Smaller Than NPS 6 (DN 150): Cast-iron wall sleeves, Galvanized-steel- pipe sleeves, or Sleeve-seal fittings.

Page 1097 of 2548 ends

CIB 689- Clark Building Renovations
SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 23 0517 - 4
b. Piping NPS 6 (DN 150) and Larger: Cast-iron wall sleeves or Galvanized-steel- pipe sleeves.

2. Exterior Concrete Walls below Grade:
a. Piping Smaller Than NPS 6 (DN 150): Cast-iron wall sleeves with sleeve-seal system, galvanized-steel-pipe sleeves with sleeve-seal system, or sleeve-seal fittings. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.
b. Piping NPS 6 (DN 150) and Larger: Cast-iron wall sleeves with sleeve-seal system or Galvanized-steel-pipe sleeves with sleeve-seal system.
1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.

3. Concrete Slabs-on-Grade:
a. Piping Smaller Than NPS 6 (DN 150): Cast-iron wall sleeves with sleeve-seal system, Galvanized-steel-pipe sleeves with sleeve-seal system, or Sleeve-seal fittings. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.
b. Piping NPS 6 (DN 150) and Larger: Cast-iron wall sleeves with sleeve-seal system, Galvanized-steel-pipe sleeves with sleeve-seal system, or Galvanized- steel-pipe sleeves. 1) Select sleeve size to allow for 1-inch (25-mm) annular clear space between piping and sleeve for installing sleeve-seal system.

4. Concrete Slabs above Grade:
a. Piping Smaller Than NPS 6 (DN 150): Galvanized-steel-pipe sleeves orSleeve- seal fittings.
b. Piping NPS 6 (DN 150) and Larger: Galvanized-steel-pipe sleeves.

5. Interior Partitions:
a. Piping Smaller Than NPS 6 (DN 150): Galvanized-steel-pipe sleeves. b. Piping NPS 6 (DN 150) and Larger: Galvanized-steel-sheetsleeves.

END OF SECTION 23 0517

Page 1098 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 1
SECTION 23 0529 - MECHANICAL SUPPORTING DEVICES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Metal framing systems.

4. Thermal-hanger shield inserts.

5. Fastenersystems.

6. Pipe stands.

7. Equipment supports.

B. Related Sections:

1. Section 05 5000 "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.

2. Section 23 0516 "Expansion Fittings and Loops for HVAC Piping" for pipe guides and anchors.

3. Section 23 3114 "Ductwork" for duct hangers and supports.

1.3 DEFINITIONS
A. MSS: Manufacturers Standardization Society of The Valve and FittingsIndustry Inc.

1.4 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design trapeze pipe hangers and equipment supports, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

B. Structural Performance: Hangers and supports for HVAC piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.

1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.

2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.

Page 1099 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 2

1.5 ACTION SUBMITTALS
A. Product Data: For each type of product used on the project.

1.6 INFORMATIONAL SUBMITTALS
A. Welding certificates.

B. Shop Drawings: Signed and sealed by a qualified professional engineer. Show fabrication and installation details and include calculations for the following; include Product Data for components:

1. Trapeze pipe hangers.

2. Metal framing systems.

3. Pipe stands.

4. Equipment supports.

C. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1. Detail fabrication and assembly of trapeze hangers.

2. Design Calculations: Calculate requirements for designing trapeze hangers.

1.7 QUALITY ASSURANCE
A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

C. Hangers and Supports for mechanical and plumbing piping shall be in accordance with MSS Standards.

1. MSS SP-58 – Pipe Hangers and Supports – Materials, Design and Manufacturer

2. MSS SP-69 – Pipe Hangers and Supports – Selection and Application

3. MSS SP-89 – Pipe Hangers and Supports – Fabrication and Installation Practices D. Hangers and Supports for fire protection piping shall be in accordance with NFPA Standards. Provide products which are UL listed and FM approved.

1. NFPA 13 – Standard for the Installation of Sprinkler Systems PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:

Page 1100 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 3

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components, coated.

2. Galvanized Metallic Coating: Hot dip galvanized.

3. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel with either electroplated zinc or hot dipped galvanized finish.

B. Copper Pipe Hangers:

1. Description: MSS SP-58, Types 1 through 58, copper, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel.

C. Stainless Steel Pipe Hangers:

1. Description: MSS SP-58, Types 1 through 58, stainless steel, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainlesssteel.

2.2 TRAPEZE PIPE HANGERS
A. Description: MSS SP-69, Type 59, shop or field-fabricated pipe-support assembly made from structural hot-dip galvanized, carbon-steel shapes with MSS SP-58 hot-dip galvanized or electro-coated zinc, carbonsteel hanger rods, nuts, saddles, and U-bolts. If used, they cannot impede serviceability of equipment.

B. See delegated design requirementsin 1.4 above.

2.3 METAL FRAMING SYSTEMS
A. MFMA Manufacturer Metal Framing Systems:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Allied Tube & Conduit.
b. Cooper B-Line, Inc.
c. Powerstrut.
d. Unistrut Corporation; Tyco International, Ltd.

2. Description: Shop- or field-fabricated pipe-support assembly for supporting multiple parallel pipes.

3. Standard: MFMA-4.

4. Channels: Continuousslotted steel channel with in-turned lips.

5. Channel Nuts: Formed or stamped steel nuts or other devices designed to fit into channel slot and, when tightened, prevent slipping along channel.

6. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

7. Metallic Coating: Hot dip galvanized or electroplated zinc.

2.4 THERMAL-HANGER SHIELD INSERTS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Carpenter & Paterson, Inc.

Page 1101 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 4

2. Clement Support Services.

3. National Pipe Hanger Corporation.

4. PHS Industries, Inc.

5. Pipe Shields, Inc.; a subsidiary of Piping Technology & Products, Inc.

6. Piping Technology & Products, Inc.

7. Rilco Manufacturing Co., Inc.

B. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig (688- kPa) or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig (862-kPa) minimum compressive strength and vapor barrier.

C. Insulation-Insert Material for Hot Piping: Water-repellent treated, ASTM C 533, Type I calcium silicate with 100-psig (688-kPa) ASTM C 552, Type II cellular glass with 100-psig (688-kPa) minimum compressive strength.

D. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.

E. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

F. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.

2.5 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete with pullout, tension, and shear capacities appropriate for supported loads and building materials where used.

B. Mechanical-Expansion Anchors: Insert-wedge-type, zinc-coated steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

2.6 PIPE STANDS
A. General Requirements for Pipe Stands: Shop- or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping.

B. Compact Pipe Stand: One-piece plastic unit with integral-rod roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration.

C. Low-Type, Single-Pipe Stand: One-piece stainless-steel base unit with plastic roller, for roof installation without membrane penetration.

D. High-Type, Single-Pipe Stand:

1. Description: Assembly of base, vertical and horizontal members, and pipe support, for roof installation without membrane penetration.

2. Base: Stainless steel.

3. Vertical Members: Two or more cadmium-plated-steel or stainless-steel, continuous- thread rods.

4. Horizontal Member: Cadmium-plated-steel or stainless-steel rod with plastic or stainless- steel, roller-type pipe support.

Page 1102 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 5
E. High-Type, Multiple-Pipe Stand:

1. Description: Assembly of bases, vertical and horizontal members, and pipe supports, for roof installation without membrane penetration.

2. Bases: One or more; plastic.

3. Vertical Members: Two or more protective-coated-steel channels.

4. Horizontal Member: Protective-coated-steel channel.

5. Pipe Supports: Galvanized-steel, clevis-type pipe hangers.

F. Curb-Mounted-Type Pipe Stands: Shop- or field-fabricated pipe supports made from structural- steel shapes, continuous-thread rods, and rollers, for mounting on permanent stationary roof curb.

2.7 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon- steel shapes, with hot dip galvanized coating.

2.8 MISCELLANEOUS MATERIALS AND REQUIREMENTS
A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and hot dip galvanized.

B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, non-shrink and nonmetallic grout; suitable for interior and exterior applications.

1. Properties: Non-staining, noncorrosive, and nongaseous.

2. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength. a. Hangers are required to be specific to pipe and ductwork independently and not shared.

PART 3 - EXECUTION

3.1 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

Multiple, stacked trapeze's are not allowed.

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.

2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.

Page 1103 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 6
C. Metal Framing System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled metal framing systems.

D. Thermal-Hanger Shield Installation: Install in pipe hanger orshield for insulated piping.

E. Fastener System Installation:

1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches (100 mm) thick in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder- actuated tool manufacturer's operating manual.

2. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured.

Install fasteners according to manufacturer's written instructions.

F. Pipe Stand Installation:

1. Pipe Stand Types except Curb-Mounted Type: Assemble components and mount on smooth roof surface. Do not penetrate roof membrane.

2. Curb-Mounted-Type Pipe Stands: Assemble components or fabricate pipe stand and mount on permanent, stationary roof curb. See Section 077200 "Roof Accessories" for curbs.

G. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

H. Supports and hangers shall not interfere with equipment access.

I. Equipment Support Installation: Fabricate from welded-structural-steel shapes.

J. Install hangers and supports to allow controlled thermal movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

K. Install lateral bracing with pipe hangers and supports to prevent swaying.

L. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, strainers, and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.

M. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

N. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

O. Insulated Piping:

1. Attach clamps and spacersto piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.

Page 1104 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 7
c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation. a. Option: Thermal-hanger shield inserts may be used. Include steel weightdistribution plate for pipe NPS 4 (DN 100) and larger if pipe is installed on rollers.

3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
a. Option: Thermal-hanger shield inserts may be used. Include steel weightdistribution plate for pipe NPS 4 (DN 100) and larger if pipe is installed on rollers.

4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2 (DN 8 to DN 90): 12 inches long and 0.048 inch thick. b. NPS 4 (DN 100): 12 inches long and 0.06 inch thick.
c. NPS 5 and NPS 6 (DN 125 and DN 150): 18 inches long and 0.06 inch thick. d. NPS 8 to NPS 14 (DN 200 to DN 350): 24 inches long and 0.075 inch thick.

5. Pipes NPS 8 (DN 200) and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.

6. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.

7. Un-insulated Piping:
a. Where insulation is not required, use similar metal hangers such as copper hangers for copper piping, stainless steel for stainless steel piping, etc.

3.2 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.

B. Grouting: Place grout under supportsfor equipment and make bearing surface smooth.

C. Provide lateral bracing, to prevent swaying, for equipment supports.

3.3 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.

B. Fit exposed connectionstogether to form hairline joints. Field weld connectionsthat cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work; and with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

Page 1105 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 8

2. Obtain fusion without undercut or overlap.

3. Remove welding flux immediately.

4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.

5. Re-galvanize if galvanizing affected.

3.4 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excesslength of continuous-thread hanger and support rodsto 1-1/2 inches(40 mm).

3.5 PAINTING
A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC- PA 1 requirements for touching up field-painted surfaces.

1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils (0.05 mm).

B. Touchup: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal are specified in Section 099100 "Painting"." C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.

3.6 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.

D. Use coated carbon-steel pipe hangers and supports, metal trapeze pipe hangers and metal framing systems and attachments for general service applications.

E. Use copper pipe hangers and copper attachments for copper piping and tubing. Likewise for stainless steel piping and tubing, use stainless steel hangers.

F. Use padded hangersfor piping that issubject to scratching.

G. Use thermal-hanger shield inserts for insulated piping and tubing.

H. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except asspecified in piping system Sections, install the following types:

Page 1106 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 9

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of non-insulated or insulated, stationary pipes NPS 1/2 to NPS 30 (DN 15 to DN 750).

2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F, pipes NPS 4 to NPS 24 (DN 100 to DN 600), requiring up to 4 inches of insulation.

3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps(MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36 (DN 20 to DN 900), requiring clamp flexibility and up to 4 inches of insulation.

4. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to NPS 24 (DN 15 to DN 600) if little or no insulation is required.

5. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4 (DN 15 to DN 100), to allow off-center closure for hanger installation before pipe erection.

6. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of non- insulated, stationary pipes NPS 3/4 to NPS 8 (DN 20 to DN 200).

7. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of non-insulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).

8. Adjustable Band Hangers (MSS Type 9): For suspension of non-insulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).

9. Adjustable, Swivel-Ring Band Hangers(MSS Type 10): Forsuspension of non-insulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).

10. Split Pipe Ring with or without Turnbuckle Hangers (MSS Type 11): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 8 (DN 10 to DN 200).

11. Extension Hinged or Two-Bolt Split Pipe Clamps(MSS Type 12): Forsuspension of non- insulated, stationary pipes NPS 3/8 to NPS 3 (DN 10 to DN 80).

12. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30 (DN 15 to DN 750).

13. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.

14. Pipe Saddle Supports (MSS Type 36): For support of pipes NPS 4 to NPS 36 (DN 100 to DN 900), with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate.

15. Pipe Stanchion Saddles (MSS Type 37): For support of pipes NPS 4 to NPS 36 (DN 100 to DN 900), with steel-pipe base stanchion support and cast-iron floor flange or carbon- steel plate, and with U-bolt to retain pipe.

16. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes NPS 2- 1/2 to NPS 36 (DN 65 to DN 900) if vertical adjustment is required, with steel-pipe base stanchion support and cast-iron floor flange.

17. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30 (DN 25 to DN 750), from two rods if longitudinal movement caused by expansion and contraction might occur.

18. Adjustable Roller Hangers (MSS Type 43): For suspension of pipes NPS 2-1/2 to NPS 24 (DN 65 to DN 600), from single rod if horizontal movement caused by expansion and contraction might occur.

19. Complete Pipe Rolls (MSS Type 44): For support of pipes NPS 2 to NPS 42 (DN 50 to DN 1050) if longitudinal movement caused by expansion and contraction might occur but vertical adjustment is not necessary.

20. Pipe Roll and Plate Units (MSS Type 45): For support of pipes NPS 2 to NPS 24 (DN 50 to DN 600) if small horizontal movement caused by expansion and contraction might occur and vertical adjustment is not necessary.

21. Adjustable Pipe Roll and Base Units (MSS Type 46): For support of pipes NPS 2 to NPS 30 (DN 50 to DN 750) if vertical and lateral adjustment during installation might be required in addition to expansion and contraction.

I. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

Page 1107 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 10

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to NPS 24 (DN 24 to DN 600).

2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 (DN 20 to DN 600) if longer ends are required for riser clamps.

J. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.

2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.

3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.

4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.

5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.

K. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.

2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.

3. Side-Beam or Channel Clamps(MSS Type 20): For attaching to bottom flange of beams, channels, or angles.

4. Center-Beam Clamps(MSS Type 21): For attaching to center of bottom flange of beams.

5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.

6. C-Clamps(MSS Type 23): For structuralshapes.

7. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.

8. Side-Beam Clamps(MSS Type 27): For bottom of steel I-beams.

9. Steel-Beam Clamps with Eye Nuts (MSS Type 28): For attaching to bottom of steel I- beams for heavy loads.

10. Linked-Steel Clamps with Eye Nuts (MSS Type 29): For attaching to bottom of steel I- beams for heavy loads, with link extensions.

11. Malleable-Beam Clamps with Extension Pieces (MSS Type 30): For attaching to structuralsteel.

12. Welded-Steel Brackets: For support of pipes from below or for suspending from above by using clip and rod. Use one of the following for indicated loads:
a. Light (MSS Type 31): 750 lb.
b. Medium (MSS Type 32): 1500 lb.
c. Heavy (MSS Type 33): 3000 lb.

13. Side-Beam Brackets(MSS Type 34): For sides of steel or wooden beams.

14. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required.

15. Horizontal Travelers (MSS Type 58): For supporting piping systems subject to linear horizontal movement where headroom is limited.

L. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.

Page 1108 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SUPPORTING DEVICES 23 0529 - 11

2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.

3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.

M. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Restraint-Control Devices(MSS Type 47): Where indicated to control piping movement.

2. Spring Cushions(MSS Type 48): For light loadsif vertical movement does not exceed 1- 1/4 inches (32 mm).

3. Spring-Cushion Roll Hangers (MSS Type 49): For equipping Type 41, roll hanger with springs.

4. Spring Sway Braces (MSS Type 50): To retard sway, shock, vibration, or thermal expansion in piping systems.

5. Variable-Spring Hangers (MSS Type 51): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from hanger.

6. Variable-Spring Base Supports (MSS Type 52): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from base support.

7. Variable-Spring Trapeze Hangers (MSS Type 53): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from trapeze support.

8. Constant Supports: For critical piping stress and if necessary to avoid transfer of stress from one support to another support, critical terminal, or connected equipment. Include auxiliary stops for erection, hydrostatic test, and load-adjustment capability. These supports include the following types:
a. Horizontal (MSS Type 54): Mounted horizontally.
b. Vertical (MSS Type 55): Mounted vertically.
c. Trapeze (MSS Type 56): Two vertical-type supports and one trapeze member.

N. Comply with MSS SP-69 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.

O. Comply with MFMA-103 for metal framing system selections and applications that are not specified in piping system Sections.

P. Use mechanical-expansion anchors instead of building attachments where required in concrete construction.

END OF SECTION 23 0529

Page 1109 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SYSTEMS IDENTIFICATION 23 0553 - 1
SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section. and Supplementary
B. Division 23 Section 23 2113 - Hydronic Piping
C. Division 23 Section 23 2116 - Hydronic Piping Specialties D. Division 23 Section 23 2213 - Steam Piping
E. Division 23 Section 23 2216 - Steam Piping Specialties F. Division 23 Section 23 3114 - Ductwork
G. Division 23 Section 23 3314 - Ductwork Specialties

1.2 SUMMARY
A. Section Includes:

1. Equipment labels.

2. Warning signs and labels.

3. Pipe labels.

4. Valve tags.

5. Duct labels.

6. Bar coding new equipment and components (see 3.7 at end of this section).

1.3 SUBMITTAL
A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 MANUFACTURER'S for Labels: Brady, Kolbi, or Panduit.

2.2 EQUIPMENT LABELS
A. Metal Labelsfor Equipment:

Page 1110 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SYSTEMS IDENTIFICATION 23 0553 - 2

1. Material and Thickness: Brass, 0.032-inch minimum thickness, and having pre-drilled or stamped holes for attachment hardware.

2. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

3. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

4. Fasteners: Stainless-steel rivets or self-tapping screws.

5. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

B. Plastic Labels for Equipment:

1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, and having predrilled holes for attachment hardware.

2. Letter Color: White.

3. Background Color: Black.

4. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

5. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

6. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

7. Fasteners: Stainless-steel rivets or self-tapping screws.

8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

C. Label Content: Include equipment's Drawing designation or unique equipment number, Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified.

1. Label is to also indicate area and type of service being provided. a. For Example AHU - 3 Services floors 1-4 etc.
b. P3 HHW Pump Services building perimeter
D. Equipment Label Schedule: For each item of equipment to be labeled, on 8-1/2-by-11-inch bond paper.

Tabulate equipment identification number and identify Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified. Equipment schedule shall be included in operation and maintenance data.

2.3 WARNING SIGNS AND LABELS
A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, and having predrilled holes for attachment hardware.

B. Letter Color: White.

C. Background Color: Red.

D. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

Page 1111 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SYSTEMS IDENTIFICATION 23 0553 - 3
E. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

F. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

G. Fasteners: Stainless-steel rivets or self-tapping screws.

H. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

I. Label Content: Include caution and warning information, plus emergency notification instructions.

2.4 PIPE LABELS
A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, showing flow direction, and area served (i.e. perimeter heating hot water).

B. Pre-tensioned Pipe Labels: Pre-coiled, semi-rigid plastic formed to cover full circumference of pipe and to attach to pipe without fasteners or adhesive.

C. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

D. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings, pipe size, and an arrow indicating flow direction.

1. Flow-Direction Arrows: Integral with piping system service lettering to accommodate both directions, or as separate unit on each pipe label to indicate flow direction, and visible all around pipe.

2. Lettering Size: At least 1-1/2 inches high.

2.5 VALVE TAGS
A. Valve tags shall be per University standards and according to project valve specification section(s). Unless required differently in project valve specification section(s), valve tags to be minimum 1.5" round brass, attached with metallic chains.

2.6 DUCT LABELS
A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, and having predrilled holes for attachment hardware.

B. Letter Color: White.

C. Background Color: Red.

D. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

E. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

Page 1112 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SYSTEMS IDENTIFICATION 23 0553 - 4
F. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

G. Fasteners: Stainless-steel rivets or self-tapping screws.

H. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

I. Duct Label Contents: Include identification of duct service using same designations or abbreviations as used on Drawings, duct size, and an arrow indicating flow direction.

1. Flow-Direction Arrows: Integral with duct system service lettering to accommodate both directions, or as separate unit on each duct label to indicate flow direction.

2. Lettering Size: At least 1-1/2 inches high.

J. OTHER SPECIALIZED LABELING AND REQUIREMENTS

1. Fire damper access panels shall be permanently identified on the exterior by labels not less than 2" in height reading "FIRE DAMPER".

2. Smoke damper access panels shall be permanently identified on the exterior by labels not less than 2" in height reading "SMOKE DAMPER".

3. Combination fire/smoke damper access panels shall be permanently identified on the exterior by labels not less than 2" in height reading "RESETTABLE FIRE/SMOKE DAMPER". Mark the other access panels "FIRE/SMOKE DAMPER."

4. Items listed in items 1-3 above, will also be listed on a full size, laminated print and left in the main mechanical room as indicated above.

K. Duct static pressure sensors shall be permanently identified on the exterior by labels not less than 2" in height reading "STATIC PRESSURE SENSOR".

1. Humidity sensors in ductwork shall be permanently identified on the exterior by labels not less than 2" in height reading "HUMIDITY SENSOR".

2. Abbreviations: No abbreviationsto be used.

3. All smoke and fire damper locations are to be posted as a pdf on the DDC system per fan system.

This information is also to be located in the fire command center for the building. Coordinate with other trades to make sure this happens, and support as required via that coordination. a. STENCILING
1) Not allowed.

L. Barcoding New Equipment: Contractor to barcode any new equipment for the University, and in coordination with their requirements.

PART 3 - EXECUTION

3.1 GENERAL
A. Refer to and adhere to "Northwestern University Pipe, Valve, and Fittings Standards" for work of this section.

Page 1113 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SYSTEMS IDENTIFICATION 23 0553 - 5

3.2 PREPARATION
A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.

3.3 EQUIPMENT LABEL INSTALLATION
A. Install or permanently fasten labels on each major item of mechanical equipment.

B. Locate equipment labels where accessible and visible.

3.4 PIPE LABEL INSTALLATION
A. Piping Color-Coding: Painting of piping isspecified in Division 09 Section "Interior Painting." B. Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Near each valve and control device.

2. Near each branch connection, excluding short takeoffs for fixtures and terminal units. Where flow pattern is not obvious, mark each pipe at branch.

3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.

4. At access doors, manholes, and similar access points that permit view of concealed piping.

5. Near major equipment items and other points of origination and termination.

6. Spaced at maximum intervals of 10 feet along each run, and at every change in direction.

7. On piping above removable acoustical ceilings. Omit intermediately spaced labels.

C. Pipe Label Color and Marking:

1. Shall be in accordance with ANSI A13.1.

3.5 VALVE TAG INSTALLATION AND DOCUMENTATION
A. Tag valves according to project valve specification section(s), and provide typed list (loose and framed under glass) per same specification section(s).

1. A valve tag schedule is to be mounted in each mechanical room and on every floor (for that respective floor) in a location to be determined by the Evanston Engineer shop.

2. Each valve tag schedule will have an associated architectural print showing each valve location.

3. At project completion two additional hard copies are to be provided in addition to an electronic copy. One for University Archive and one for the FMO Engineers shop.

4. Two copies of the mechanical piping flow diagram will be supplied. All prints that are supplied that are located in mechancial rooms are to be laminated.

B. Pipe tags that are the first isolation for a utility in a mechanical room or building need to have indicated where the next upstream valve is located and the associated valve number indicated on the valve tag.

Page 1114 of 2548 ends

CIB 689- Clark Building Renovations
MECHANICAL SYSTEMS IDENTIFICATION 23 0553 - 6

1. Thisis applicable for all utility isolation valves for each mechanical room space.

3.6 DUCT LABEL INSTALLATION
A. Install self-adhesive duct labels with permanent adhesive on air ducts in the following color codes:

1. Blue: For cold-air supply ducts.

2. Yellow: For hot-air supply ducts.

3. Green: For exhaust-, outside-, relief-, return-, and mixed-air ducts.

4. ASME A13.1 Colors and Designs: For hazardous material exhaust.

B. Locate labels at maximum intervals of 10 feet, at every change in direction, and within 3' of wall and floor penetrations on both sides of same.

C. Along with all other ducting on the job, label toxic exhaust.

3.7 NEW EQUIPMENT BARCODING
A. Coordinate with University, and bar code all new Division 23 equipment and components for them, according to their requirements. Requirements include, but not limited to, being iPad compatible, have the ability to call up maps of the areas on bar code scans, must have safeguards built in to flag missing items, and the devices on the maps need to be color coded based on inspection status.

END OF SECTION 23 0553

Page 1115 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 1
SECTION 23 0594 - TESTING, ADJUSTING, AND BALANCING (TAB) PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes testing, adjusting and balancing HVAC systems to provide design conditions as indicated by the associated drawings. This Section includes, but is not limited to the following:

1. Balancing Air Systems - Constant air volume and variable-air-volume systems.

2. Balancing Hydronic Piping Systems - Constant and variable-flow hydronic systems, and primary-secondarysystems.

3. Measuring the electrical performance of HVAC equipment.

4. Verification that automatic control devices are functioning properly.

5. Measurement of sound levels as related to rotating mechanical equipment.

6. Vibration testing and analysis of all rotating equipment greater than or equal to 10 hp.

7. Measurement of duct leakage.

8. Reporting results of the activities and procedures specified in this Section.

B. The testing, adjusting and balancing of the air and hydronic systems shall be performed by an independent TAB contractor contracted directly by the University, and approved companies are Arrow Testing and Balancing, CEPro, Hill Mechanical, and ITB (Independent Test and Balance).

1.2 DEFINITIONS
A. AABC: Associated Air Balance Council.

B. Adjust: To regulate fluid flow rates and air patterns at the system or terminal level. At the system level an example would be reducing fan speed; at the terminal level an example would be changing a damper position.

C. Balance: To proportion air or water flows within the distribution system, including submains, branches and terminals with respect to design quantities.

D. Draft: A current of air, when referring to localized effect caused by one or more factors of high air velocity, low ambient temperature, or direction of airflow, whereby more heat is withdrawn from a person’s skin than is normally dissipated.

E. Independent: Not affiliated with or in employment of any Contractor.

F. NEBB: National Environmental Balancing Bureau.

G. Procedure: An approach to and execution of a sequence of work operations to yield repeatable results.

H. Report Forms: Test data sheets for recording test data in logical order.

Page 1116 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 2
I. Static Head: The pressure due to the weight of the fluid above the point of measurement. In a closed system, static head is equal on both sides of the pump.

J. Suction Head: The height of fluid surface above the centerline of the pump on the suction side.

K. System Effect: A phenomenon that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.

L. System Effect Factors: Allowances used to calculate a reduction of the performance ratings of a fan when installed under conditions different from those presented when the fan was performance tested.

M. TAB: Testing, adjusting, and balancing.

N. TAB Specialist: An entity engaged to perform TAB Work.

O. Testing, Adjusting and Balancing (TAB) Agent: The entity responsible for performing and reporting the TAB procedures.

P. Terminal: A point where the controlled medium (fluid or energy) enters or leaves the distribution system.

1.3 PREINSTALLATION MEETINGS
A. TAB Conference: If requested by the Owner, conduct a TAB conference at project site after approval of the TAB strategies and procedures plan to develop a mutual understanding of the details. Provide a minimum of 14 days' advance notice of scheduled meeting time and location.

1. Minimum Agenda Items:
a. The Contract Documents examination report.
b. The TAB plan.
c. Needs for coordination and cooperation of trades and subcontractors. d. Proposed procedures for documentation and communication flow.

1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: Within [30] [60] [90] <Insert number> days of Contractor's Notice to Proceed, submit documentation that the TAB specialist and this Project's TAB team members meet the qualifications specified in "Quality Assurance" Article.

Page 1117 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 3
B. Contract Documents Examination Report: Within [30] [60] [90] <Insert number> days of Contractor's Notice to Proceed, submit the Contract Documents review report as specified in Part 3.

C. Strategies and Procedures Plan: Within [30] [60] [90] <Insert number> days of Contractor's Notice to Proceed, submit TAB strategies and step-by-step procedures as specified in "Preparation" Article.

D. System Readiness Checklists: Within [30] [60] [90] <Insert number> days of Contractor's Notice to Proceed, submit system readiness checklists as specified in "Preparation" Article.

E. Examination Report: Submit a summary report of the examination review required in "Examination" Article.

F. Certified TAB reports.

G. Sample report forms.

H. Instrument calibration reports, to include the following:

1. Instrument type and make.

2. Serial number.

3. Application.

4. Dates of use.

5. Dates of calibration.

1.5 QUALITY ASSURANCE
A. TAB Specialists Qualifications: Certified by AABC or NEBB.

1. TAB Field Supervisor: Employee of the TAB specialist and certified by AABC or NEBB.

2. TAB Technician: Employee of the TAB specialist and certified by AABC or NEBB as a TAB technician.

B. Instrumentation Type, Quantity, Accuracy, and Calibration: Comply with requirements in ASHRAE 111, Section 4, "Instrumentation" but in all cases, all instrumentation used for testing shall be calibrated within 6 months of use, an accuracy of the instrumentation shall not be less than what is specified by the instrument manufacturer.

C. Certify TAB field data reports and perform the following:

1. Review field data reports to validate accuracy of data and to prepare certified TAB reports.

2. Certify that the TAB team complied with the approved TAB plan and the procedures specified and referenced in this Specification.

D. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 7.2.2 - "Air Balancing." E. ASHRAE/IESNA Compliance: Applicable requirements in ASHRAE/IESNA 90.1, Section 6.7.2.3 - "System Balancing."

Page 1118 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 4

1.6 FIELD CONDITIONS
A. Full Owner Occupancy: Owner will occupy the site and existing building during entire TAB period.

Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.

B. Partial Owner Occupancy: Owner may occupy completed areas of building before Substantial Completion.

Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.

1.7 WARRANTY
A. Provide one of the following performance guarantees:

1. AABC National Project Performance Guarantee

2. NEBB Certificate of Conformance Certification

3. TABB Quality Assurance Program Guarantee
B. Guarantee shall include provisions that the certified TAB firm has tested and balanced systems according to the Contract Document and that the systems are balanced to optimum performance capabilities within design and installation limits.

PART 2 - PRODUCTS

2.1 INSTRUMENT TEST HOLES
A. To be Ventlock #699,
PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems' designs that may preclude proper TAB of systems and equipment.

B. Examine systems for installed balancing devices, such as test ports, gage cocks, thermometer wells, flowcontrol devices, balancing valves and fittings, and manual volume dampers. Verify that locations of these balancing devices are accessible.

C. Examine the approved submittals for HVAC systems and equipment.

D. Examine design data including HVAC system descriptions, statements of design assumptions for environmental conditions and systems' output, and statements of philosophies and assumptions about HVAC system and equipment controls.

E. Examine ceiling plenums and underfloor air plenums used for supply, return, or relief air to verify that they meet the leakage class of connected ducts as specified in Division 23 Section "Ductwork" and are properly separated from adjacent areas. Verify that penetrations in plenum walls are sealed and firestopped if required.

Page 1119 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 5
F. Examine equipment performance data including fan and pump curves.

1. Relate performance data to Project conditions and requirements, including system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.

2. Calculate system-effect factors to reduce performance ratings of HVAC equipment when installed under conditions different from the conditions used to rate equipment performance. To calculate system effects for air systems, use tables and charts found in AMCA 201, "Fans and Systems," or in SMACNA's "HVAC Systems - Duct Design." Compare results with the design data and installed conditions.

G. Examine system and equipment installations and verify that field quality-control testing, cleaning, and adjusting specified in individual Sections have been performed.

H. Examine test reports specified in individual system and equipment Sections.

I. Examine HVAC equipment and filters and verify that bearings are greased, belts are aligned and tight, and equipment with functioning controls is ready for operation.

J. Examine terminal units, such as variable-air-volume boxes, and verify that they are accessible and their controls are connected and functioning.

K. Examine strainers. Verify that startup screens are replaced by permanent screens with indicated perforations.

L. Examine three-way valves for proper installation for their intended function of diverting or mixing fluid flows.

M. Examine heat-transfer coils for correct piping connections and for clean and straight fins.

N. Examine system pumps to ensure absence of entrained air in the suction piping.

O. Examine operating safety interlocks and controls on HVAC equipment.

P. Report deficiencies discovered before and during performance of TAB procedures. Observe and record system reactions to changes in conditions. Record default set points if different from indicated values.

3.2 PREPARATION
A. Prepare a TAB plan that includes strategies and step-by-step procedures.

B. Complete system-readiness checks and prepare reports. Verify the following:

1. Permanent electrical-power wiring is complete.

2. Hydronic systems are filled, clean, and free of air.

3. Automatic temperature-control systems are operational.

4. Equipment and duct access doors are securely closed.

5. Balance, smoke, and fire dampers are open.

6. Isolating and balancing valves are open and control valves are operational.

7. Ceilings are installed in critical areas where air-pattern adjustments are required and accessto balancing devices is provided.

Page 1120 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 6

8. Windows and doors can be closed so indicated conditions for system operations can be met.

3.3 GENERAL PROCEDURES FOR TESTING AND BALANCING
A. Perform testing and balancing procedures on each system according to the procedures contained in AABC's "National Standards for Total System Balance" or NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" and in this Section.

1. Comply with requirements in ASHRAE 62.1-2007, Section 7.2.2, "Air Balancing." B. Cut insulation, ducts, pipes, and equipment cabinets for installation of test holes and probes to the extent necessary for TAB procedures, and duct test hole fittings shall be provided where shown on the drawings or specified in the Data sheets. T&B instrument test holes to be Ventlock #699.

1. After testing and balancing, install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish according to Division 23 Section "Mechanical System Insulation."
C. Mark equipment and balancing devices, including damper-control positions, valve position indicators, fan-speed-control levers, and similar controls and devices, with paint or other suitable, permanent identification material to show final settings.

D. Take and report testing and balancing measurements in inch-pound (IP) units.

3.4 GENERAL PROCEDURES FOR BALANCING AIR SYSTEMS
A. Prepare test reports for both fans and outlets. Obtain manufacturer's outlet factors and recommended testing procedures. Crosscheck the summation of required outlet volumes with required fan volumes.

B. Prepare schematic diagrams of systems' "as-built" duct layouts.

C. For variable-air-volume systems, develop a plan to simulate diversity.

D. Determine the best locationsin main and branch ductsfor accurate duct-airflow measurements.

E. Check airflow patterns from the outdoor-air louvers and dampers and the return- and exhaust- air dampers through the supply-fan discharge and mixing dampers.

F. Locate start-stop and disconnect switches, electrical interlocks, and motor starters.

G. Verify that motor starters are equipped with properly sized thermal protection.

H. Check dampersfor proper position to achieve desired airflow path.

I. Check for airflow blockages.

J. Check condensate drains for proper connections and functioning.

K. Check for proper sealing of air-handling-unit components.

Page 1121 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 7
L. Verify that air ductsystem issealed asspecified in Division 23 Section "Ductwork."

3.5 PROCEDURES FOR CONSTANT-VOLUME AIR SYSTEMS
A. Adjust fans to deliver total indicated airflows within the maximum allowable fan speed listed by fan manufacturer.

1. Measure total airflow.
a. Where sufficient space in ducts is unavailable for Pitot-tube traverse measurements, measure airflow at terminal outlets and inlets and calculate the total airflow.

2. Measure fan static pressures asfollowsto determine actualstatic pressure:
a. Measure outlet static pressure as far downstream from the fan as practical and upstream from restrictions in ducts such as elbows and transitions. b. Measure static pressure directly at the fan outlet or through the flexible connection. c. Measure inlet static pressure of single-inlet fans in the inlet duct as near the fan as possible, upstream from the flexible connection, and downstream from duct restrictions. d. Measure inlet static pressure of double-inlet fans through the wall of the plenum that houses the fan.

3. Measure static pressure across each component that makes up an air-handling unit, rooftop unit, and other air-handling and -treating equipment.
a. Report the cleanlinessstatus of filters and the time static pressures are measured.

4. Measure static pressures entering and leaving other devices, such as sound traps, heat- recovery equipment, and air washers, under final balanced conditions.

5. Review Record Documents to determine variations in design static pressures versus actual static pressures. Calculate actual system-effect factors. Recommend adjustments to accommodate actual conditions.

6. Obtain approval from Engineer for adjustment of fan speed higher or lower than indicated speed.

Comply with requirements in Division 23 Sections for air-handling units for adjustment of fans, belts, and pulley sizes to achieve indicated air-handling-unit performance.

7. Do not make fan-speed adjustments that result in motor overload. Consult equipment manufacturers about fan-speed safety factors. Modulate dampers and measure fan- motor amperage to ensure that no overload will occur. Measure amperage in full-cooling, full-heating, economizer, and any other operating mode to determine the maximum required brake horsepower.

B. Adjust volume dampers for main duct, submain ducts, and major branch ducts to indicated airflows within specified tolerances.

1. Measure airflow of submain and branch ducts.
a. Where sufficient space in submain and branch ducts is unavailable for Pitot-tube traverse measurements, measure airflow at terminal outlets and inlets and calculate the total airflow for that zone.

Page 1122 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 8

2. Measure static pressure at a point downstream from the balancing damper, and adjust volume dampers until the proper static pressure is achieved.

3. Remeasure each submain and branch duct after all have been adjusted. Continue to adjust submain and branch ducts to indicated airflows within specified tolerances.

C. Measure air outlets and inlets without making adjustments.

1. Measure terminal outlets using a direct-reading hood or outlet manufacturer's written instructions and calculating factors.

D. Adjust air outlets and inlets for each space to indicated airflows within specified tolerances of indicated values. Make adjustments using branch volume dampers rather than extractors and the dampers at air terminals.

1. Adjust each outlet in same room or space to within specified tolerances of indicated quantities without generating noise levels above the limitations prescribed by the Contract Documents.

2. Adjust patterns of adjustable outlets for proper distribution without drafts.

Page 1123 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 9

3.6 PROCEDURES FOR MOTORS
A. Motors 1/2 HP and Larger: Test at final balanced conditions and record the following data:

1. Manufacturer's name, model number, and serial number.

2. Motor horsepower rating.

3. Motor rpm.

4. Phase and hertz.

5. Nameplate and measured voltage, each phase.

6. Nameplate and measured amperage, each phase.

7. Starter size and thermal-protection-element rating.

8. Service factor and frame size.

B. Motors Driven by Variable-Frequency Controllers: Test manual bypass of controller to prove proper operation.

3.7 PROCEDURES FOR CONDENSING UNITS
A. Verify proper rotation of fans.

B. Measure entering- and leaving-air temperatures.

C. Record fan and motor operating data.

3.8 TOLERANCES/ACCEPTEDCRITERIA

1. For most spaces, the total supply air quantity to each space of a system shall be within - 5% to +10% of design. Review project specific requirements with NU Project Manager.

2. The percent tolerance of each outlet within a space shall be per Table 23 0594-1.

Table 23 0594-1
System Number of Outlets in Space
1 2 3 or More
Single Zone, Multizone, VAV
-5%
+10%
±10% ± 15%
Heating and Ventilating
-5%
+10%
±15% ±15%

3. Air quantity of each return air grille and diffuser shall be within ±10% of design. The design room pressurization must be maintained regardless of the tolerance at each individual diffuser.

4. Vivariums: In general, these laboratories shall be under negative pressure. The design should meet the current NIH Design Requirements Manual for Biomedical Laboratories and Animal Research Facilities. Any reduction in airflow shall be presented by the project Engineer of Record and reviewed by the NU Project Manager and Project Engineer.

5. Culture Rooms: These roomsshall be under positive pressure.

6. Hydronic Systems: Heating and cooling hydronic systems shall be balanced so that the flow is from 0 to +5% of design at each coil.

7. Combination fire/smoke dampers in dynamic smoke control systems shall be tested for closure under airflow conditions (International Mechanical Code – 2009, Section 607), and to assure positive pressure of certain zones, and negative pressure for other zones. Smoke dampers in dynamic smoke control systems must close under airflow conditions.

Page 1124 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 10

3.9 REPORTING
A. All test reports are to have an Executive Summary which shall state extent of system compliance, system deficiencies, and recommended changes.

B. Initial Construction-Phase Report: Based on examination of the Contract Documents as specified in "Examination" Article, prepare a report on the adequacy of design for systems' balancing devices.

Recommend changes and additions to systems' balancing devices to facilitate proper performance measuring and balancing. Recommend changes and additions to HVAC systems and general construction to allow access for performance measuring and balancing devices.

C. Status Reports: Prepare bi-weekly progress reports to describe completed procedures, procedures in progress, and scheduled procedures. Include a list of deficiencies and problems found in systems being tested and balanced. Prepare a separate report for each system and each building floor for systems serving multiple floors.

3.10 FINAL REPORT
A. General: Prepare a certified written report; tabulate and divide the report into separate sections for tested systems and balanced systems.

1. Include a certification sheet at the front of the report's binder, signed and sealed by the certified testing and balancing engineer.

2. Include a list of instruments used for procedures, along with proof of calibration.

B. Final Report Contents: In addition to certified field-report data, include the following:

1. Pump curves.

2. Fan curves.

3. Manufacturers' test data.

4. Field test reports prepared by system and equipment installers.

5. Other information relative to equipment performance; do not include Shop Drawings and product data.

C. General Report Data: In addition to form titles and entries, include the following data:

1. Title page.

2. Name and address of the TAB contractor.

3. Project name.

4. Project location.

5. Architect's name and address.

6. Engineer's name and address.

7. Contractor's name and address.

8. Report date.

9. Signature of TAB supervisor who certifies the report.

10. Table of Contents with the total number of pages defined for each section of the report. Number each page in the report.

11. Summary of contents including the following:
a. Indicated versus final performance.
b. Notable characteristics of systems.
c. Description of system operation sequence if it varies from the Contract Documents.

12. Nomenclature sheetsfor each item of equipment.

Page 1125 of 2548 ends

TESTING, ADJUSTING AND BALANCING (TAB) 23 0594 - 11

13. Data for terminal units, including manufacturer's name, type, size, and fittings.

14. Notesto explain why certain final data in the body of reports vary from indicated values.

15. Test conditionsfor fans and pump performance formsincluding the following:
a. Settings for outdoor-, return-, and exhaust-air dampers. b. Conditions of filters.
c. Cooling coil, wet- and dry-bulb conditions.
d. Face and bypass damper settings at coils.
e. Fan drive settings including settings and percentage of maximum pitch diameter. f. Inlet vane settings for variable-air-volume systems. g. Settings for supply-air, static-pressure controller. h. Settings for differential pressure, hydronic differential control i. Other system operating conditions that affect performance.

D. System Diagrams: Include schematic layouts of air and hydronic distribution systems. Present each system with single-line diagram and include the following:

1. Quantities of outdoor, supply, return, and exhaust airflows.

2. Water and steam flow rates.

3. Duct, outlet, and inletsizes.

4. Pipe and valve sizes and locations.

5. Terminal units.

6. Balancing stations.

7. Position of balancing devices.

3.11 ADDITIONAL TESTS
A. Within 90 days of completing TAB, perform additional TAB to verify that balanced conditions are being maintained throughout and to correct unusual conditions.

B. Seasonal Periods: If initial TAB procedures were not performed during near-peak summer and winter conditions, perform additional TAB during near-peak summer and winter conditions.

END OF SECTION 23 0594

Page 1126 of 2548 ends

HVAC INSULATION 23 0700 - 1
SECTION 23 0700 - HVAC INSULATION
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Insulation Materials:
a. Flexible elastomeric.
b. Mineral fiber.

2. Duct Fire Wrap

3. Insulating cements.

4. Adhesives.

5. Mastics.

6. Sealants.

7. Field-applied jackets.

8. Removable insulation covers.

9. Tapes.

10. Securements.

11. Corner angles.

B. Related Sections:

1. Section 23 3114 "Ductwork."

1.2 SUBMITTALS
A. Product Data: For each type of product indicated.

B. Shop Drawings:

1. Detail application of protective shields, saddles, and inserts at hangers for each type of insulation and hanger.

Page 1127 of 2548 ends

HVAC INSULATION 23 0700 - 2

2. Detail attachment and covering of heat tracing inside insulation.

3. Detail insulation application at pipe expansion joints for each type of insulation.

4. Detail insulation application at elbows, fittings, flanges, valves, linkages of control devices, and specialties for each type of insulation.

5. Detail removable insulation at piping specialties, equipment connections, and access panels.

6. Detail application of field-applied jackets.

7. Detail field application for each equipment type.

C. Field quality-control reports.

1.3 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Insulation and related materials shall have fire-test- response characteristics indicated, as determined by testing identical products per ASTM E 84, by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with appropriate markings of applicable testing and inspecting agency.

1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.

2. Insulation Installed Outdoors: Flame-spread index of 75 or less, and smoke-developed index of 150 or less.

B. Materials and installation in accordance with NFPA 255, UL 723, and MICA (Midwest Insulation ContractorsAssociation).

C. Insulation thickness shall meet the requirements of ASHRAE Standard 90.1 and Northwestern University Standards and shall be selected to eliminate avoid condensation.

1.4 SPECIAL WARRANTIES
A. Five (5) years, see Division 01.

PART 2 - PRODUCTS

2.1 INSULATION MATERIALS
A. Comply with requirements in Part 3 schedule articles for where insulating materials shall be applied.

B. Products shall not contain asbestos, lead, mercury, or mercury compounds.

C. Productsthat come in contact with stainless steel shall have a leachable chloride content of less than 50 ppm when tested according to ASTM C 871.

D. Insulation materials for use on austenitic stainless steel shall be qualified as acceptable according to ASTM C 795.

E. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process.

Page 1128 of 2548 ends

HVAC INSULATION 23 0700 - 3
F. Flexible Elastomeric: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type I for tubular materials and Type II for sheet materials.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Aeroflex USA Inc.; Aerocel.
b. Armacell LLC; AP Armaflex (Preferred).
c. RBX Corporation; Insul-Sheet 1800 and Insul-Tube 180.

G. Mineral-Fiber Blanket Insulation: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C553, Type II and ASTM C1290, Type III with factory-applied FSK jacket. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

1. Products: Subject to compliance with requirements, provide one of the following:
a. CertainTeed Corp.; SoftTouch Duct Wrap.
b. Johns Manville; Microlite.
c. Knauf Insulation; Atmosphere Duct Wrap.
d. Owens Corning; All-Service SOFTR Duct Wrap.

H. Mineral-Fiber Board Insulation: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 612, Type IA or Type IB. For duct and plenum applications, provide insulation with factoryapplied FSK jacket. For equipment applications, provide insulation with factory-applied ASJ. Factoryapplied jacket requirements are specified in "Factory-Applied Jackets" Article.

1. Products: Subject to compliance with requirements, provide one of the following:
a. CertainTeed Corp.; CertaPro Commercial Board.
b. Johns Manville; 800 Series Spin-Glas.
c. Knauf Insulation; Insulation Board.
d. Owens Corning; Fiberglas 700 Series.

I. Mineral-Fiber, Preformed Pipe Insulation:

1. Products: Subject to compliance with requirements, provide one of the following:
a. Johns Manville; Micro-Lok.
b. Knauf Insulation; Redi-Klad 1000 Pipe Insulation.
c. Owens Corning; Fiberglas Pipe Insulation.

2. Type I, 850 deg F Materials: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 547, Type I, Grade A, with factory-applied ASJ. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article. Densities per PART 3 schedules.

J. Mineral-Fiber, Pipe and Tank Insulation: Mineral or glass fibers bonded with a thermosetting resin. Semirigid board material with factory-applied ASJ complying with ASTM C 1393, Type II or Type IIIA Category 2, or with properties similar to ASTM C 612, Type IB. Nominal density is

2.5 lb/cu. ft. or more. Thermal conductivity (k-value) at 100 deg F is 0.29 Btu x in./h x sq. ft. x deg F or less. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

1. Products: Subject to compliance with requirements, provide one of the following:

Page 1129 of 2548 ends

HVAC INSULATION 23 0700 - 4
a. Johns Manville; Fabrication Board.
b. Knauf Insulation; Pipe and Tank.
c. Owens Corning; Pipe and Tank.

2.2 Grease Duct Insulation
A. Products: Subject to compliance with requirements, provide one of the following:

1. 3M Fire Barrier Duct Wrap Type 15A

2. UNIFRAX Fyrewrap

3. Thermal Ceramics Firemaster
B. Joint free, lightweight, non-asbestos, high temperature, inorganic foil encapsulated ceramic fiber blanket duct wrap for use on commercial grease hood duct systems in accordance with ASTM E2336.

C. A zero inch clearance to combustible construction and two (2) hour fire resistive rated enclosure system shall be assured.

D. Adhesives: High performance filament tape, one inch wide, and aluminum foil tape to seal cut edges of blankets.

E. Banding Material: Two (2) hour requirement, ¾” wide, no less than 0.015 inches thick, Type 304 stainless steel, (stainless steel hose clamps, ½ inch may be substituted for hanger insulations only).

F. Insulation Pins: 10 gage, 4 inches to 5 inches long, copper coated steel no less than 1-1/2 inch by 1-1/2 inch or 1-1/2 inch diameter galvanized steel speed clip.

G. Fire Stopping Materials: UL No R9464 classified noncombustible fiber with a flame spread of 0, smoke development of 0 and fuel contribution of 0. Water based, mild chemical resistant putty complying with ASTM E136-82 may be used.

2.3 INSULATING CEMENTS
A. Mineral-Fiber, Hydraulic-Setting Insulating and Finishing Cement: Comply with ASTM C 449/C 449M.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Insulco, Division of MFS, Inc.; SmoothKote.
b. P. K. Insulation Mfg. Co., Inc.; PK No. 127, and Quik-Cote. c. Rock Wool Manufacturing Company; Delta One Shot.

2.4 ADHESIVES
A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated, unless otherwise indicated.

B. Adhesives to be waterproof fire-retardant type.

Page 1130 of 2548 ends

HVAC INSULATION 23 0700 - 5
C. [Retain subparagraph below if low-emitting materials are required for LEED-NC Credit EQ

4.1. 1. For indoor applications, use adhesive for Flexible Elastomeric, ASJ, and PVC Jacket that has a VOC content of 50 g/L or less and for Mineral-Fiber Adhesive that has a VOC content of 80 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).]

2.5 MASTICS
A. Materials shall be compatible with insulation materials, jackets, and substrates.

2.6 SEALANTS
A. Joint Sealants:

1. Materials shall be compatible with insulation materials, jackets, and substrates.

2. Permanently flexible, elastomeric sealant.

3. Service Temperature Range: Minus 100 to plus 300 deg F.

4. For indoor applications, use sealants that have a VOC content of 420 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

B. FSK and MetalJacket Flashing Sealants:

1. Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; CP-76-8.
b. Foster Products Corporation, H. B. Fuller Company; 95-44. c. Vimasco Corporation; 750.

2. Materials shall be compatible with insulation materials, jackets, and substrates.

3. Fire- and water-resistant, flexible, elastomeric sealant.

4. Service Temperature Range: Minus 40 to plus 250 deg F.

5. Color: Aluminum.

6. For indoor applications, use sealants that have a VOC content of 420 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

C. ASJ Flashing Sealants, and Vinyl, PVDC, and PVC Jacket Flashing Sealants:

1. Materials shall be compatible with insulation materials, jackets, and substrates.

2. Fire- and water-resistant, flexible, elastomeric sealant.

3. Service Temperature Range: Minus 40 to plus 250 deg F.

4. Color: White.

5. For indoor applications, use sealants that have a VOC content of 420 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

2.7 FACTORY-APPLIED JACKETS
A. Insulation system schedules indicate factory-applied jackets on various applications. When factoryapplied jackets are indicated, comply with the following:

Page 1131 of 2548 ends

HVAC INSULATION 23 0700 - 6

1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing; complying with ASTM C 1136, Type I.

2. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing; complying with ASTM C 1136, Type II.

2.8 FIELD-APPLIED JACKETS
A. Field-applied jacketsshall comply with ASTM C 921, Type I, unless otherwise indicated.

B. FSK Jacket: Aluminum-foil-face, fiberglass-reinforced scrim with kraft-paper backing.

C. PVC Jacketing and Pre-Formed Fitting Covers: High-impact-resistant, UV-resistant PVC complying with ASTM D 1784, Class 16354-C; roll stock ready jacketing for shop or field cutting and forming, and preformed fitting covers. Thicknesses as indicated in field-applied jacket schedules.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Johns Manville; Zeston (Preferred), 300 Seriesif outdoors, 2000 seriesif indoors. b. P.I.C. Plastics, Inc.; FG Series.
c. Proto PVC Corporation; LoSmoke.
d. Speedline Corporation; SmokeSafe.

2. Adhesive: Asrecommended by jacket material manufacturer.

3. Color: White.

4. Factory-fabricated fitting covers to match jacket if available; otherwise, field fabricate. a. Shapes: 45- and 90-degree, short- and long-radius elbows, tees, valves, flanges, unions, reducers, end caps, soil-pipe hubs, traps, mechanical joints, and P-trap and supply covers for lavatories.

5. Factory-fabricated tank heads and tank side panels.

D. Aluminum Jacket: Comply with ASTM B 209, Alloy 3003, 3005, 3105 or 5005, Temper H-14.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Childers Products, Division of ITW; Metal Jacketing Systems. b. PABCO Metals Corporation; Surefit.
c. RPR Products, Inc.; Insul-Mate.

2. Finish and thickness are indicated in field-applied jacketschedules.

3. Factory-Fabricated Fitting Covers:
a. Same material, finish, and thickness as jacket.
b. Preformed 2-piece or gore, 45- and 90-degree, short- and long-radius elbows. c. Tee covers.
d. Flange and union covers.
e. End caps.
f. Beveled collars.
g. Valve covers.
h. Field fabricate fitting covers only if factory-fabricated fitting covers are not available.

Page 1132 of 2548 ends

HVAC INSULATION 23 0700 - 7

2.9 REMOVABLE INSULATION COVERS
A. Acceptable Manufacturers:

1. Advance Thermal Corp.

2. Thermal Energy Products, Inc.

3. Temptec.

4. Remco Technology, Inc.

B. Removable ceramic blanket type with Velcro tabs and box-stitched, 1.5" wide, D-ring straps, gussets, hot face inner jacketing, type 304 stainlesssteel tag with laser engraved data riveted to body, outer jacketing, type 304 stainless steel quilting pins, specifically shaped and constructed for insulated item.

2.10 TAPES
A. ASJ Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Avery Dennison Corporation, Specialty Tapes Division; Fasson 0835. b. Compac Corp.; 104 and 105.
c. Ideal Tape Co., Inc., an American Biltrite Company; 428 AWF ASJ. d. Venture Tape; 1540 CW Plus, 1542 CW Plus, and 1542 CW Plus/SQ.

2. Width: 3 inches.

3. Thickness: 11.5 mils.

4. Adhesion: 90 ouncesforce/inch in width.

5. Elongation: 2 percent.

6. Tensile Strength: 40 lbf/inch in width.

7. ASJ Tape Disks and Squares: Precut disks or squares of ASJ tape.

B. FSK Tape: Foil-face, vapor-retarder tape matching factory-applied jacket with acrylic adhesive; complying with ASTM C 1136.

1. Products: Subject to compliance with requirements, provide one of the following:
a. Avery Dennison Corporation, Specialty Tapes Division; Fasson 0827. b. Compac Corp.; 110 and 111.
c. Ideal Tape Co., Inc., an American Biltrite Company; 491 AWF FSK. d. Venture Tape; 1525 CW, 1528 CW, and 1528 CW/SQ.

2. Width: 3 inches.

3. Thickness: 6.5 mils.

4. Adhesion: 90 ouncesforce/inch in width.

5. Elongation: 2 percent.

6. Tensile Strength: 40 lbf/inch in width.

7. FSK Tape Disks and Squares: Precut disks or squares of FSK tape.

C. PVC Tape: White vapor-retarder tape matching field-applied PVC jacket with acrylic adhesive. Suitable for indoor and outdoor applications.

Page 1133 of 2548 ends

HVAC INSULATION 23 0700 - 8

1. Products: Subject to compliance with requirements, provide one of the following:
a. Avery Dennison Corporation, Specialty Tapes Division; Fasson 0555. b. Compac Corp.; 130.
c. Ideal Tape Co., Inc., an American Biltrite Company; 370 White PVC tape. d. Venture Tape; 1506 CW NS.

2. Width: 2 inches.

3. Thickness: 6 mils.

4. Adhesion: 64 ouncesforce/inch in width.

5. Elongation: 500 percent.

6. Tensile Strength: 18 lbf/inch in width.

2.11 SECUREMENTS
A. Aluminum Bands: ASTM B 209, Alloy 3003, 3005, 3105, or 5005; Temper H-14, 0.020 inch thick, 1/2 inch wide with wing or closed seal.

B. Insulation Pins and Hangers:

1. Metal, Adhesively Attached, Perforated-Base Insulation Hangers: Baseplate welded to projecting spindle that is capable of holding insulation, of thickness indicated, securely in position indicated when self-locking washer is in place. Comply with the following requirements:
a. Baseplate: Perforated, galvanized carbon-steelsheet, 0.030 inch thick by 2 inches square. b. Spindle: Copper- or zinc-coated, low carbon steel, fully annealed, 0.106-inchdiameter shank, length to suit depth of insulation indicated. c. Adhesive: Recommended by hanger manufacturer. Product with demonstrated capability to bond insulation hanger securely to substrates indicated without damaging insulation, hangers, and substrates.

2. Self-Sticking-Base Insulation Hangers: Baseplate welded to projecting spindle that is capable of holding insulation, of thickness indicated, securely in position indicated when self-locking washer is in place. Comply with the following requirements:
a. Baseplate: Galvanized carbon-steelsheet, 0.030 inch thick by 2 inches square. b. Spindle: Copper- or zinc-coated, low carbon steel, fully annealed, 0.106-inchdiameter shank, length to suit depth of insulation indicated. c. Adhesive-backed base with a peel-off protective cover.

3. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch- thick, galvanizedsteel sheet, with beveled edge sized as required to hold insulation securely in place but not less than 1-1/2 inches in diameter.
a. Protect ends with capped self-locking washersincorporating a spring steel insert to ensure permanent retention of cap in exposed locations.

C. Wire: 0.062-inch soft-annealed, stainlesssteel.

Page 1134 of 2548 ends

HVAC INSULATION 23 0700 - 9

2.12 CORNER ANGLES
A. PVC Corner Angles: 30 mils thick, minimum 1 by 1 inch, PVC according to ASTM D 1784, Class 16354-C. White or color-coded to match adjacent surface.

B. Aluminum Corner Angles: 0.040 inch thick, minimum 1 by 1 inch, aluminum according to ASTM B 209, Alloy 3003, 3005, 3105 or 5005; Temper H-14.

PART 3 - EXECUTION

3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.

B. Coordinate insulation installation with the trade installing heat tracing. Comply with requirementsfor heat tracing that apply to insulation.

C. Mix insulating cements with clean potable water; if insulating cements are to be in contact with stainlesssteel surfaces, use demineralized water.

3.2 GENERAL INSTALLATION REQUIREMENTS
A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of equipment, ducts and fittings, and piping including fittings, valves, and specialties.

B. Install insulation materials, forms, vapor barriers or retarders, jackets, and thicknesses required for each item of equipment, duct system, and pipe system as specified in insulation system schedules.

C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.

D. Install insulation with longitudinal seams at top and bottom of horizontal runs.

E. Install multiple layers of insulation with longitudinal and end seamsstaggered.

F. Do not weld brackets, clips, or other attachment devices to piping, fittings, and specialties.

G. Keep insulation materials dry during application and finishing.

H. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.

I. Install insulation with least number of joints practical.

J. Where vapor barrier is indicated (all cold work at a minimum, and it shall be continuous), seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vaporbarrier mastic.

Page 1135 of 2548 ends

HVAC INSULATION 23 0700 - 10

1. Install insulation continuously through hangers and around anchor attachments.

2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.

3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation materialmanufacturer.

4. Cover inserts with jacket material matching adjacent pipe insulation. Install shields over jacket, arranged to protect jacket from tear or puncture by hanger, support, and shield.

K. Apply adhesives, mastics, and sealants at manufacturer'srecommended coverage rate and wet and dry film thicknesses.

L. Install insulation with factory-applied jackets as follows:

1. Draw jacket tight and smooth.

2. Cover circumferential joints with 3-inch- wide strips, of same material as insulation jacket. Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.

3. Overlap jacket longitudinalseams at least 1-1/2 inches. Install insulation with longitudinal seams at bottom of pipe. Clean and dry surface to receive self-sealing lap.

4. Cover joints and seams with tape as recommended by insulation material manufacturer to maintain vapor seal.

5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends adjacent to duct and pipe flanges and fittings.

M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness.

N. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.

O. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.

P. For above ambientservices, do not install insulation to the following:

1. Vibration-control devices.

2. Testing agency labels and stamps.

3. Nameplates and data plates.

4. Manholes.

5. Handholes.

6. Cleanouts.

3.3 PENETRATIONS
A. Insulation Installation at Roof Penetrations: Install insulation continuously through roof penetrations.

1. Seal penetrations with flashing sealant.

2. For applications requiring only indoor insulation, terminate insulation above roof surface and seal with joint sealant. For applications requiring indoor and outdoor insulation,

Page 1136 of 2548 ends

HVAC INSULATION 23 0700 - 11
install insulation for outdoor applications tightly joined to indoor insulation ends. Seal joint with joint sealant.

3. Extend jacket of outdoor insulation outside roof flashing at least 2 inches below top of roof flashing.

4. Seal jacket to roof flashing with flashing sealant.

B. Insulation Installation at Underground Exterior Wall Penetrations: Terminate insulation flush with sleeve seal. Seal terminations with flashing sealant.

C. Insulation Installation at Aboveground Exterior Wall Penetrations: Install insulation continuously through wall penetrations.

1. Seal penetrations with flashing sealant.

2. For applications requiring only indoor insulation, terminate insulation inside wall surface and seal with joint sealant. For applications requiring indoor and outdoor insulation, install insulation for outdoor applications tightly joined to indoor insulation ends. Seal joint with joint sealant.

3. Extend jacket of outdoor insulation outside wall flashing and overlap wall flashing at least 2 inches.

4. Seal jacket to wall flashing with flashing sealant.

D. Insulation Installation at Interior Wall and Partition Penetrations (That Are Not Fire Rated): Install insulation continuously through walls and partitions.

E. Insulation Installation at Fire-Rated Wall and Partition Penetrations: Install insulation continuously through penetrations of fire-rated walls and partitions. Terminate insulation at fire dampersleevesforfire- rated wall and partition penetrations. Externally insulate damper sleeves to match adjacent insulation and overlap duct insulation at least 2 inches.

1. Comply with requirements in Division 07 Section "Penetration Firestopping." F. Insulation Installation at Floor Penetrations:

1. Duct: Install insulation continuously through floor penetrations that are not fire rated. For penetrations through fire-rated assemblies, terminate insulation at fire damper sleeves and externally insulate damper sleeve beyond floor to match adjacent duct insulation. Overlap damper sleeve and duct insulation at least 2 inches.

2. Pipe: Install insulation continuously through floor penetrations.

3. Seal penetrations through fire-rated assemblies. Comply with requirements in Division 07 Section "Penetration Firestopping."
G. Insulation Installation on Pumps:

1. Fabricate metal boxes lined with insulation. Fit boxes around pumps and coincide box joints with splits in pump casings. Fabricate joints with outward bolted flanges. Bolt flanges on 6-inch centers, starting at corners. Install 3/8-inch- diameter fasteners with wing nuts. Alternatively, secure the box sections together using a latching mechanism.

2. Fabricate boxes from aluminum, at least 0.050 inch thick.

3. For below ambient services, install a vapor barrier at seams, joints, and penetrations. Seal between flanges with replaceable gasket material to form a vapor barrier.

Page 1137 of 2548 ends

HVAC INSULATION 23 0700 - 12

3.4 GENERAL PIPE INSULATION INSTALLATION
A. Requirements in this article generally apply to all insulation materials except where more specific requirements are specified in various pipe insulation material installation articles.

B. Insulation Installation on Fittings, Valves, Strainers, Flanges, and Unions:

1. Install insulation over fittings, valves, strainers, flanges, unions, and other specialties with continuous thermal and vapor-retarder integrity, unless otherwise indicated.

2. Insulate pipe elbows using preformed fitting insulation or mitered fittings made from same material and density as adjacent pipe insulation. Each piece shall be butted tightly against adjoining piece and bonded with adhesive. Fill joints, seams, voids, and irregular surfaces with insulating cement finished to a smooth, hard, and uniform contour that is uniform with adjoining pipe insulation.

3. Insulate tee fittings with preformed fitting insulation or sectional pipe insulation of same material and thickness as used for adjacent pipe. Cut sectional pipe insulation to fit. Butt each section closely to the next and hold in place with tie wire. Bond pieces with adhesive.

4. Insulate valves using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. For valves, insulate up to and including the bonnets, valve stuffing-box studs, bolts, and nuts. Fill joints, seams, and irregular surfaces with insulating cement.

5. Insulate strainers using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. Fill joints, seams, and irregular surfaces with insulating cement. Insulate strainers so strainer basket flange or plug can be easily removed and replaced without damaging the insulation and jacket.

Provide a removable reusable insulation cover. For below ambient services, provide a design that maintains vapor barrier.

6. Insulate flanges and unions using a section of oversized preformed pipe insulation. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker.

7. Cover segmented insulated surfaces with a layer of finishing cement and coat with a mastic. Install vapor-barrier mastic for below ambient services and a breather mastic for above ambient services.

Reinforce the mastic with fabric-reinforcing mesh. Trowel the mastic to a smooth and well-shaped contour.

8. For services not specified to receive a field-applied jacket except for flexible elastomeric, install fitted PVC cover over elbows, tees, strainers, valves, flanges, and unions. Terminate ends with PVC end caps. Tape PVC covers to adjoining insulation facing using PVC tape.

9. Label the outside insulation jacket of each union with the word "UNION." Match size and color of pipe labels.

C. Insulate instrument connections for thermometers, pressure gages, pressure temperature taps, test connections, flow meters, sensors, switches, and transmitters on insulated pipes, vessels, and equipment.

Shape insulation at these connections by tapering it to and around the connection with insulating cement and finish with finishing cement, mastic, and flashing sealant.

D. Install removable insulation covers at locations indicated. Installation shall conform to the following:

Page 1138 of 2548 ends

HVAC INSULATION 23 0700 - 13

1. Make removable flange and union insulation from sectional pipe insulation of same thickness as that on adjoining pipe. Install same insulation jacket as adjoining pipe insulation.

2. When flange and union covers are made from sectional pipe insulation, extend insulation from flanges or union long at least two times the insulation thickness over adjacent pipe insulation on each side of flange or union. Secure flange cover in place with stainless- steel or aluminum bands.

Select band material compatible with insulation and jacket.

3. Construct removable valve insulation covers in same manner as for flanges except divide the twopart section on the vertical center line of valve body.

4. When covers are made from block insulation, make two halves, each consisting of mitered blocks wired to stainless-steel fabric. Secure this wire frame, with its attached insulation, to flanges with tie wire. Extend insulation at least 2 inches over adjacent pipe insulation on each side of valve.

Fill space between flange or union cover and pipe insulation with insulating cement. Finish cover assembly with insulating cement applied in two coats. After first coat is dry, apply and trowel second coat to a smooth finish.

5. Unless a PVC jacket is indicated in field-applied jacket schedules, finish exposed surfaces with a metal jacket.

3.5 FLEXIBLE ELASTOMERIC INSULATION INSTALLATION
A. Seal longitudinalseams and end joints with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

B. Insulation Installation on Pipe Flanges:

1. Install pipe insulation to outer diameter of pipe flange.

2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.

3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with cut sections of sheet insulation of same thickness as pipe insulation.

4. Secure insulation to flanges and sealseams with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

C. Insulation Installation on Pipe Fittings and Elbows:

1. Install mitered sections of pipe insulation.

2. Secure insulation materials and sealseams with manufacturer'srecommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install preformed valve covers manufactured of same material as pipe insulation when available.

2. When preformed valve covers are not available, install cut sections of pipe and sheet insulation to valve body. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

3. Install insulation to flanges as specified for flange insulation application.

4. Secure insulation to valves and specialties and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

Page 1139 of 2548 ends

HVAC INSULATION 23 0700 - 14

3.6 MINERAL-FIBER INSULATION INSTALLATION
A. Insulation Installation on Straight Pipes and Tubes:

1. Secure each layer of preformed pipe insulation to pipe with wire or bands and tighten bands without deforming insulation materials.

2. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with vaporbarrier mastic and joint sealant.

3. For insulation with factory-applied jackets secure tabs with additional adhesive as recommended by insulation material manufacturer and seal with vapor-barrier mastic and flashing sealant.

B. Insulation Installation on Pipe Flanges:

1. Install preformed pipe insulation to outer diameter of pipe flange.

2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.

3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with mineral-fiber blanket insulation.

4. Install jacket material with manufacturer's recommended adhesive, overlap seams at least 1 inch, and seal joints with flashing sealant.

C. Insulation Installation on Pipe Fittings and Elbows:

1. Install preformed sections of same material as straight segments of pipe insulation when available.

2. When preformed insulation elbows and fittings are not available, install mitered sections of pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation materials with wire or bands.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install preformed sections of same material as straight segments of pipe insulation when available.

2. When preformed sections are not available, install mitered sections of pipe insulation to valve body.

3. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

4. Install insulation to flanges as specified for flange insulation application.

E. Blanket and Board Insulation Installation on Ducts and Plenums: Secure with adhesive and insulation pins.

1. Apply adhesives according to manufacturer's recommended coverage rates per unit area.

2. Apply adhesive to entire circumference of ducts and to all surfaces of fittings and transitions.

3. Install either capacitor-discharge-weld pins and speed washers or cupped-head, capacitordischarge-weld pins on sides and bottom of horizontal ducts and sides of vertical ducts as follows:
a. On ductsides with dimensions 18 inches and smaller, place pins along longitudinal centerline of duct. Space 3 inches maximum from insulation end joints, and 16 inches o.c.

Page 1140 of 2548 ends