June 16, 2026
2026
DISCUSSION:
Section 2.34.040 of the Richmond Municipal Code (RMC) (Schedule of fees and service charges) establishes the City’s process for reviewing and adjusting fees to ensure they reflect the costs of providing services. Under this provision, the City Manager reviews fees on a regular schedule and makes adjustments as needed to support cost-recovery for City operations.
Sections 13.45.010 and 13.45.020 further outline the responsibilities of the Finance Department in maintaining and updating City-levied taxes, fees, and charges. These sections require the Director of Finance to adjust fees annually, or as needed, based on changes in the Bureau of Labor Statistics Employment Cost Index (ECI) for State and Local Government Workers. They also require the City to complete a comprehensive fee study at least once every five years.
In addition, these sections require the Director of Finance to present an annual report to the City Council listing all proposed fee adjustments. Fee changes do not take effect until approved by the City Council. The City Council may accept or reject individual adjustments but may not modify them.
USER FEES
This update of the Master Fee Schedule (MFS) adjusts user fees by the Bureau of Labor Statistics Employment Cost Index (ECI). The ECI adjusts wage rate inflation in local governments. In this update, City staff is proposing to update fees by 4.1 percent for the fees subject to the yearly ECI update. The 4.1 percent corresponds to the change of the ECI from the previous fee adoption date of June 3, 2025.
The MFS proposed for adoption by the City Council includes the following changes and/or adjustments:
Employment Cost Index (ECI) Adjustment: The fee schedule is adjusted to reflect the change in the ECI, as provided in Section 13.45.010 of the RMC. The adjusted fees become effective 30 days after final City Council approval of the ordinance amendment and adoption of the resolution.
Fire Department: Updates align fees with the 2025 California Fire Code and improve clarity, equity, and consistency across operational permit categories. Added / Revised: New permits for Energy Storage Systems and Fumigation/Insecticidal Fogging; clarification of Cannabis Cultivation/Plant Extraction; introduction of a tiered fee structure for scrap-tire storage including a new category for properties under 5,000 sq. ft. and updates to Other Occupancy categories and State Licensed Care Facilities to reflect current California Fire Code definitions Removed: Elimination of obsolete Highly Combustible Storage permit categories; removal of the outdated operating-permit reference column in the Fire Department 2702
June 16, 2026
2026
section of the MFS; and replacement of the previous O-4 scaled-fee model with a single capped fee for occupancies over 20,000 sq. ft. for the Fire & Life Safety Inspections the Other Occupancy buildings
Police/Code Enforcement: Moving certain administrative fees from the Police Department section to the Community Development – Code Enforcement section better aligns fees with the responsible department.
Reassigned to Code Enforcement: Taxi permit fees (new driver and annual renewal), and alcohol and tobacco licensing fees
Remaining with Police: Alcohol and tobacco decoy‑ operation fees, which remain with the Police Department as decoy operations are Police‑ run functions and should stay within the Police fee schedule
Police Department: Updated the Concealed Weapons permit process to include comprehensive background investigations and proposed adjustments to the associated fee(s) to reflect the required staff time to complete the process.
Community Development Department: This fee section has been reorganized to improve clarity and a new category of Tobacco Retail License fees is proposed, including application, annual licensing, appeal, suspension, and revocation charges.
Public Works Department: Updated the Encroachment section to improve clarity and organization.
Community Services Department (Recreation): A new Non-Resident fee tier set at 25 percent above resident rates is introduced to support equitable cost recovery. Additional updates include new Tool Library fees, including late, cleaning, and replacement charges, and revised rental and park reservation fees for the Memorial Auditorium Main Flor and Civic Center Plaza.
City-wide Employee Hourly Rates: Updated and included all currently authorized positions listed in the Position Control Report, ensuring alignment with the current approved staffing structure.
Subregional Transportation Mitigation Program (STMP): STMP fees included in the Impact Fees section are set by the West Contra Costa Transportation Advisory Committee (WCCTAC). The updated rates are effective July 1, 2026 (Attachment 4).
Master Fee Schedule Format Improvements: The MFS has been updated to improve usability and navigation. A new cover page provides direct quick‑ link access to key Community Development resources, including Planning, Building, Land Development, and the Impact Fee Calculator. In addition, a comprehensive table of contents has been added to help users quickly locate fee sections across all departments. 2703
June 16, 2026
2026
IMPACT FEES – Phase-In Approach
Due to the significant increase in developer impact fees, the City Council adopted a multiyear phase-in approach to gradually implement the approved increases. For non-residential properties, developer impact fees would be revised over two years. Future annual increases will follow the ECI until a new study occurs in three to four years. For residential properties, the phase-in approach that began in 2024 will end in 2028. Afterwards, fees will be revised annually according to the ECI, or a new study will be conducted.
Assembly Bill 602 Requirements
On January 1, 2022, new requirements went into effect for California jurisdictions implementing impact fees. Among other changes, California Assembly Bill (AB) 602 added Section 66016.5 to the Government Code, which set guidelines for impact fee nexus studies.
Four key requirements from that section which concern the nexus study are:
66016.5. (a) (2) When applicable, the nexus study shall identify the existing level of service for each public facility, identify the proposed new level of service, and include an explanation of why the new level of service is appropriate. 66016.5. (a) (4) If a nexus study supports the increase of an existing fee, the local agency shall review the assumptions of the nexus study supporting the original fee and evaluate the amount of fees collected under the original fee. 66016.5. (a) (5) A nexus study adopted after July 1, 2022, shall calculate a fee imposed on a housing development project proportionately to the square footage of proposed units of the development. A local agency that imposes a fee proportionately to the square footage of the proposed units of the development shall be deemed to have used a valid method to establish a reasonable relationship between the fee charged and the burden posed by the development.
66016.5. (a) (6) Large jurisdictions shall adopt a capital improvement plan as a part of the nexus study.
One key change described above is the methodology used to calculate residential impact fees. Previously, like many jurisdictions, the City of Richmond calculated these fees based on the number of dwelling units. Going forward, residential impact fees will be calculated based on the square footage of each unit. This updated approach is intended to provide a more equitable fee structure by aligning fees more closely with the scale of development, so that smaller dwelling units are assessed lower fees than larger units.
NEXT STEPS:
Due to recent legislation, additional technical work is required to support the Traffic Impact Fee update. This work involves developing a long-term plan that demonstrates how the City will expand its transportation infrastructure to accommodate and mitigate the impacts of new 2704
June 16, 2026
2026
development. The Public Works Department is currently refining a list of transportation projects with assistance from one of the City’s on-call consultants. These projects may include improvements that support traffic flow, enhance safety, and address multimodal needs consistent with Senate Bill 743 (e.g., complete streets, bicycle and pedestrian facilities, and transit improvements). City staff will return to the City Council with proposed updates to the Developer Impact Fees, with a focus on the Traffic Impact Fee component.
The City has also retained Willdan Financial Services to complete a comprehensive User Fee Study for all City departments, in addition to preparing the Traffic Impact Fee Report.
This City-wide study is intended to modernize the City’s fee structure, improve transparency, and better align fees with the actual cost of providing services. The User Fee Study is expected to be completed in Spring 2027.
In parallel, the City will begin a Storm Drainage Rate Adjustment Study in 2027. Consistent with statutory requirements, any proposed adjustments to storm drainage rates are expected to be presented to voters in Spring 2027.
DOCUMENTS ATTACHED:
Attachment 1 – Master Fee Schedule including Proposed Impact Fees Attachment 2 – Ordinance
Attachment 3 – Presentation
Attachment 4 – STMP Fee Adjustment Memorandum
2705
Community Development – Quick Links
Planning Division - Fee Schedule
Zoning applications, subdivisions, CEQA review, ADUs, historic review, entitlements https://www.ci.richmond.ca.us/DocumentCenter/View/29443/Fee-Schedule---Planning-Division-07182024 Building Division
Building permits, plan checks, mechanical/electrical/plumbing, energy compliance https://www.ci.richmond.ca.us/2099/Building-Division
Developer Impact Fee Calculator
Interactive tool for estimating park, transportation, public safety, sewer, CBSC, and public art fees https://www.ci.richmond.ca.us/2102/Fees-Checklists (select “Impact Fee Calculator”) About This Document
City of Richmond, California
Master Fee Schedule – FY 2026-27
Introduction & Quick Navigation
To streamline navigation, especially for development and construction projects, use the links below to access key Community Development resources and tools:
The Master Fee Schedule (MFS) lists all City Council–adopted fees for municipal services. This document helps residents, businesses, and development professionals quickly identify fees relevant to their activities and projects. - Development related fees appear under Planning, Building, Engineering, and Developer Impact Fees (parks, library, police, fire, transportation, sewer, storm drain).
- Fees are organized by department.
- Use supplemental schedules above for in-depth fee detail. - Many fees are adjusted annually using inflation indices (ECI, CCI) as authorized by City Council.
COVER June 16, 2026 2706 Page 1 of 81
Community Development Internal Services
· Developer Impact Fees — 3 · Finance — 50
· Building Regulations – Building Permits ·
IT – Cable Fees — 51
- Pass-through Fees — 5 ·
IT – GIS — 52
· Building Regulations – Building Permits — 8 Police Department · Building Regulations – Building Permits ·
Police Services & Permits — 54
- Miscellaneous Fees — 16 Public Works
· Planning – Permit Fees — 17 · Public Wroks Permits — 56 · Housing Division - Permits Fees — 24 · Engineering — 59 · Commercial Cannabis Regulatory — 26 · Stormwater — 61 · Code Enforcement — 27 · Wastewater — 63
City Clerk / City Attorney / City Manager
· Document & Copy Fees — 28 Rent Program
Community Services ·
Rent Program Fees — 66
· Recreation — 29 Transportation
· Employment & Training — 34 · R Transit — 67
· Library — 35 · Parking Management — 68
Fire Department Additional Schedules
· Operational Permits — 36 · Burdened Hourly Rates — 71 · Temporary / Single Use Permits — 40 · ECI Index — 81
· Special Service Tasks — 42
· Plan Review — 43
City of Richmond, California
Master Fee Schedule – FY 2026-27
TABLE OF CONTENTS
TABLE OF CONTENTS June 16, 2026 2707 Page 2 of 81
COMMUNITY DEVELOPMENT - BUILDING PERMITS - IMPACT FEES
DEVELOPER IMPACT FEES - Collected at Building Permitting RMC Articles XII and XV
DEVELOPER FEES
Description
IMPACT FEES
FY24/25 FY25/26 FY26/27 FY27/28
Residential, per square feet Previous Year 1 Year 2 Year 3 Year 4 N/A N/A N/A N/A Parks - Quimby (Subdivisions) $ 4.39 $ 6.12 $ 7.85 $ 9.58 $ 11.32 N/A N/A N/A N/A Parks (Infill) 4.39 6.05 7.71 9.37 11.03 N/A N/A N/A N/A Community / Aquatic Center 1.05 1.10 1.15 1.20 1.23 N/A N/A N/A N/A Police Facilities 0.25 0.44 0.63 0.82 0.99 N/A N/A N/A N/A Fire Protection Facilities 0.30 0.33 0.36 0.39 0.40 N/A N/A N/A N/A Library Facilities 1.19 0.54 0.54 0.54 0.54 N/A N/A N/A N/A Storm Drains 0.45 0.03 0.03 0.03 0.03
N/A N/A N/A N/A Sewer Facilities 2.29 3.71 5.13 6.55 7.98 Total (Subdivisions) $ 9.92 $ 12.27 $ 15.69 $ 19.11 $ 22.49 Total (Infill) $ 9.92 $ 12.20 $ 15.55 $ 18.90 $ 22.20
Nonresidential, per square feet Year 1 Year 2 Factor FY26/27 Office
N/A N/A N/A N/A Police Facilities $ 0.30 $ 0.42 $ 0.54 1.041 0.56 N/A N/A N/A N/A Fire Facilities 0.26 0.60 0.94 1.041 0.98 N/A N/A N/A N/A Library Facilities 0.42 0.10 0.10 1.041 0.10 N/A N/A N/A N/A Fire Facilities 0.74 0.07 0.07 1.041 0.07 N/A N/A N/A N/A Sewer Facilities 2.32 3.38 4.43 1.041 4.61 Total $ 4.04 $ 4.57 $ 6.08 $ 6.33
Industrial
N/A N/A N/A N/A Police Facilities $ 0.11 $ 0.15 $ 0.19 1.041 0.20 N/A N/A N/A N/A Fire Facilities 0.19 0.27 0.34 1.041 0.35 N/A N/A N/A N/A Library Facilities 0.18 0.03 0.03 1.041 0.03 N/A N/A N/A N/A Storm Drainage 0.79 0.10 0.10 1.041 0.10 N/A N/A N/A N/A Sewer Facilities 1.14 4.12 7.09 1.041 7.38 Total $ 2.41 $ 4.67 $ 7.75 $ 8.07
Warehousing
N/A N/A N/A N/A Police Facilities $ 0.11 $ 0.06 $ 0.06 1.041 0.06 N/A N/A N/A N/A Fire Facilities 0.19 0.10 0.10 1.041 0.10 N/A N/A N/A N/A Library Facilities 0.05 0.01 0.01 1.041 0.01 N/A N/A N/A N/A Storm Drainage 0.79 0.10 0.10 1.041 0.10 N/A N/A N/A N/A Sewer Facilities 1.14 4.12 7.09 1.041 7.38 Adopted Fees
City of Richmond
MASTER FEE SCHEDULE
Public Facility Impact Fees (The fees pay for major infrastructure improvements in each area required as a result of new development, for example off-site roads, traffic signals, fire and police facilities and park and recreation facilities.) LEGEND:
Subdivisions - refers to dwellings constructed as part of a large subdivision development poject Infill dwellings - refers todeveloping new residential units on vacant or underused lots within existing urban areas.
Last
increase
implemente
d
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
CD - B. Permit - Impact Fees June 16, 2026 2708 Page 3 of 81
COMMUNITY DEVELOPMENT - BUILDING PERMITS - IMPACT FEES
City of Richmond
MASTER FEE SCHEDULE
Last
increase
implemente
d
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
Total $ 2.28 $ 4.39 $ 7.36 $ 7.66
Commercial Previous Year 1 FY25/26 Factor FY26/27
1-Jul-2024 168.30 1-Jul-2025 174.40 1.036 Police Facilities $ 0.30 $ 0.35 0.363 1.041 0.38 1-Jul-2024 168.30 1-Jul-2025 174.40 1.036 Fire Facilities 0.26 0.61 0.632 1.041 0.66 1-Jul-2024 168.30 1-Jul-2025 174.40 1.036 Library Facilities 0.42 0.06 0.062 1.041 0.06 1-Jul-2024 168.30 1-Jul-2025 174.40 1.036 Storm Drainage 0.74 0.05 0.052 1.041 0.05 1-Jul-2024 168.30 1-Jul-2025 174.40 1.036 Sewer Facilities 2.32 3.55 3.679 1.041 3.83 Developer
Impact Fee Total $ 4.04 $ 4.62 $ 4.79 $ 4.98
Description PREVIOUS
FEE Factor CURRENT FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.
Residential, single-family development, per dwelling
unit (DU), allocated as follows:
1-Jul-2021 146.90 N/A N/A N/A - Traffic 1,968.00 Update Pending Traffic Study 1,968.00
Residential, multi-family development, per dwelling
unit (DU), allocated as follows:
1-Jul-2021 146.90 N/A N/A N/A - Traffic 1,573.00 Update Pending Traffic Study 1,573.00
Commercial development, per square foot, allocated as
follows:
1-Jul-2021 146.90 N/A N/A N/A - Traffic
4.888
Update Pending
Traffic Study 4.888
Office development, per square foot, allocated as
follows:
1-Jul-2021 146.90 N/A N/A N/A - Traffic
4.312
Update Pending
Traffic Study 4.312
Industrial development, per square foot, allocated as
follows:
1-Jul-2021 146.90 N/A N/A N/A - Traffic
1.575
Update Pending
Traffic Study 1.575
Warehousing space, per square foot, allocated as
follows:
1-Jul-2021 146.90 N/A N/A N/A - Traffic
1.575
Update Pending
Traffic Study 1.575
DEVELOPER FEES
Public Facility Impact Fees (The fees pay for major infrastructure improvements in each area required as a result of new ECI Index
for
proposed
increase ECI Factor
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 City of Richmond
MASTER FEE SCHEDULE Last
increase
implemente
d
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
CD - B. Permit - Impact Fees June 16, 2026 2709 Page 4 of 81 CURRENT FEE Factor PROPOSED FEE
HOUSING AND PASS-THROUGH FEES - Collected at Building Permitting Mitigation Administrative Fee
Not applicable N/A Not applicable N/A N/A
Mitigation Administrative Fee -- 3% of the total project impact fees (for Building Regulations included in Impact Fees administered by Finance)
0.03 N/A 0.03
Inclusionary Housing Fees
INCLUSIONARY HOUSING IN-LIEU FEES
Type of Project
N/A N/A N/A N/A N/A Rental Residential Development $12 per square foot N/A $12 per square foot
N/A N/A N/A N/A N/A Ownership Residential Development May not pay in-lieu fee N/A May not pay inlieu fee
OTHER RESIDENTIAL DEVELOPMENT PROJECTS
N/A N/A N/A N/A N/A Buildi Building Permits for Number of Residential Units Issued after the Resolution's Effective Date Applicable Fee per Square Foot of Net New Residential Floor Area N/A N/A N/A N/A N/A 0 - 370 - N/A -
N/A N/A N/A N/A N/A 371 - 741 3.00 N/A 3.00
N/A N/A N/A N/A N/A 742 - 1,111 6.00 N/A 6.00
N/A N/A N/A N/A N/A 1,112 - 1,482 9.00 N/A 9.00
N/A N/A N/A N/A N/A More than 1,482 12.00 N/A 12.00
Affordable Housing nexus fee for non-residential
development $2 per sq.ft. Non residential projects less than 5000 sq.ft. of net new gross floor area are exempt.
2.00 N/A 2.00
Park Land Dedication Fees Calculated on a Per Unit Basis N/A N/A N/A N/A N/A Single Family dwelling unit, detached or townhouse, fee per unit 432.00 N/A 432.00
N/A N/A N/A N/A N/A Duplex, medium low 372.00 N/A 372.00 N/A N/A N/A N/A N/A Condominiums and Clusters 300.00 N/A 300.00 N/A N/A N/A N/A N/A Apartments (7 units or more) 216.00 N/A 216.00
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PASS-THROUGH FEES Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
RESIDENTIAL DEVELOPMENT PROJECTS PROPOSED SOUTH OF I-580 AND ON THE POINT SAN
PABLO PENINSULA
City of Richmond
MASTER FEE SCHEDULE
Description
RMC Articles XII and XV
DEVELOPER FEES
Public Facility Impact Fees (The fees pay for major infrastructure improvements in each area required as a result of new development, for example off-site roads, traffic signals, fire and police facilities and park and recreation facilities.) CD-B. Permit, Pass-Through Fees June 16, 2026 2710 Page 5 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PASS-THROUGH FEES Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
City of Richmond
MASTER FEE SCHEDULE
Description
Pass-through fees for other agencies
STMP, CBSC and SMIP FEES are collected by, but not set by the City.
Per Ordinance 29-06, subject to ENR's CCI increase
West County Subregional Transportation Mitigation Program (STMP) - fees N/A N/A N/A N/A N/A Single Family, fee per dwelling unit 6,908.00 1.001 6,915.00 N/A N/A N/A N/A N/A AB3177 Eligble Single Family, fee per dwelling unit 6,010.00 1.001 6,016.00 N/A N/A N/A N/A N/A Multi-family Residential, fee per dwelling unit 3,404.00 1.001 3,407.00 N/A N/A N/A N/A N/A AB3177 Eligble Multi-family Residential, fee per dwelling unit 2,961.00 1.001 2,964.00 N/A N/A N/A N/A N/A Senior Housing, fee per dwelling unit 1,866.00 1.001 1,868.00 N/A N/A N/A N/A N/A AB3177 Eligble Senior Housing, fee per dwelling unit 1,623.00 1.001 1,625.00 N/A N/A N/A N/A N/A Hotel, fee per room 4,421.00 1.001 4,425.00 N/A N/A N/A N/A N/A Storage facility, fee per square fee 0.97 1.000 0.97 N/A N/A N/A N/A N/A Retail/Service, fee per square feet 8.37 1.001 8.38 Industrial, fee per square feet 7.06 1.001 7.07
Office, fee per square feet 11.08 1.001 11.09
Other (Fee Per AM pk hr trip) 9,336.00 1.001 9,345.00
Building Standards Administration Special Revolving Fund N/A N/A N/A N/A N/A $1 - 25,000 Permit Valuation (Total Project Valuation on Permit Application) 1.00 N/A 1.00
N/A N/A N/A N/A N/A $25,001 - 50,000 2.00 N/A 2.00
N/A N/A N/A N/A N/A $50,000 - 75,000 3.00 N/A 3.00
N/A N/A N/A N/A N/A $75,000 - 100 000 4.00 N/A 4.00
N/A N/A N/A N/A N/A Every $25,000 or fraction thereof above $100,000 Add $1 N/A Add $1 Strong-Motion Instrumentation and Seismic Hazard Mapping Fee
N/A N/A N/A N/A N/A
1 to 3 story Residential .00013 * Project
Valuation
Min Fee $.50
N/A
.00013 * Project
Valuation
Min Fee $.50
N/A N/A N/A N/A N/A
Commercial and over 3 story Residential .00028 * Project Valuation
Min Fee $.50
N/A
.00028 * Project
Valuation
Min Fee $.50
CD-B. Permit, Pass-Through Fees June 16, 2026 2711 Page 6 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PASS-THROUGH FEES Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
City of Richmond
MASTER FEE SCHEDULE
Description
PUBLIC ART PROGRAM
N/A N/A N/A N/A N/A
All new commercial structures; all new industrial structures; all new residential projects of ten or more dwelling units; and all construction of building additions, and/or renovations and/or tenant improvements exceeding $500,000.00 in
building development costs shall contribute an amount equal to one percent of the total development cost to be set aside for public art.
1% of Building
Development Cost N/A 1% of Building
Development Cost
N/A N/A N/A N/A N/A
All City capital improvement projects, including all City bond measure projects and all other City capital projects funded from outside granting authorities, shall contribute an amount equal to one and one-half percent of the total development costs of the City capital improvement project, to be set aside for public art.
1.5% of Building
Development Cost N/A 1.5% of Building Development Cost
Note: for detail Building Development Cost - Refer to Chapter 6.50 PUBLIC ART PROGRAM CD-B. Permit, Pass-Through Fees June 16, 2026 2712 Page 7 of 81 CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
BUILDING PERMIT FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Filing Single Trade Permits 160.00 1.041 167.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Filing Permits with two or more trades - Minor Res. Remodel / Improvement 224.00 1.041 233.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Filing Permits with two or more trades - Residential Additions and All Other 385.00 1.041 401.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Duplicate Permit Card 95.00 1.041 99.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 2nd time Permit Extension 193.00 1.041 201.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Change of Contractor 408.00 1.041 425.00 N/A N/A N/A N/A N/A Permit Transfer
10%*Original
Permit including
Plan Check
N/A
10%*Original
Permit including
Plan Check
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Certificate of Occupancy (requested separate from orig. permit) 131.00 1.041 136.00 N/A N/A N/A N/A N/A Occupancy Program Fee 10%*Building
Permit Fees N/A 10%*Building Permit Fees
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Third Plan Checking Submittal(Response to Plan Check Comments) 446.00 1.041 464.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Change of Address-Min 2hrs 514.00 1.041 535.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Release of Record 203.00 1.041 211.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Expedited Plan Review Fee - Min 2hrs 1,342.00 1.041 1,397.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Property File/Plan Retrieval per Address 321.00 1.041 334.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fax Permit per Address 179.00 1.041 186.00 N/A N/A N/A N/A N/A Technology Fee 0.001875* Project
Valuation N/A 0.001875* Project
Valuation
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Re-Inspection Fee Per Address 203.00 1.041 211.00
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
RMC Article VI
CD - Bldng Reg's, Permits June 16, 2026 2713 Page 8 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Over-Time Inspection Min 2 hrs. 1,111.00 1.041 1,157.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 3 plan check engineer hours on an approved fabricator application 1,342.00 1.041 1,397.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fabricator application renewal Min 2hrs 895.00 1.041 932.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 3 hours on a new special inspection agency application 1,110.00 1.041 1,156.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 2 hours on a special inspection agency application renewal 741.00 1.041 772.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sewer Connection Fee 3,582.00 1.041 3,730.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Plan check consultation fee-30 minutes minimum (Nonrefundable/non-transferable) 224.00 1.041 233.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation - $0 - $3000 188.00 1.041 196.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation - $3001 - $25,000 350.00 1.041 364.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation - $25,001 - $50,000 1,145.00 1.041 1,192.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation - $50,001 - $100,000 1,752.00 1.041 1,824.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation - $100,001 - $500,000 3,466.00 1.041 3,609.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation - $500,000 - $1,000,000 9,221.00 1.041 9,602.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Structure and Envelope Inspection Fee, Project Valuation -- >$1,000,001
$13,786 for the first
$1,000,000 plus
$5.00 for each
additional $1000 or
fraction thereof.
1.041
$14,355 for the
first $1,000,000
plus $5.00 for
each additional
$1000 or fraction
thereof.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Code Compliance Permit and Inspection 613.00 1.041 638.00 N/A N/A N/A N/A N/A Investigation Fee for Work Done Without Permits (in addition to the permit fee)
3 times the permit
fee NA 3 times the permit fee
CD - Bldng Reg's, Permits June 16, 2026 2714 Page 9 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Solar Structure - Residential System 450.00 1.041 450.00 N/A N/A N/A N/A N/A Photovoltaic systems up to 50kW 1,000.00 NA 1,000.00 N/A N/A N/A N/A N/A 1,000.00 NA 1,000.00
N/A N/A N/A N/A N/A 7.00 NA 7.00
N/A N/A N/A N/A N/A Photovoltaic systems above 250 kW: 1,000.00 NA 1,000.00 N/A N/A N/A N/A N/A 1,000.00 for first 50kW +$7 per kW for each kW between 51 kW and 250 kW and +$5 per kW for each kW above 250 kW
7.00 5.00 NA 7.00 5.00
N/A N/A N/A N/A N/A Thermal systems up to 30kWth 1,000.00 NA 1,000.00 N/A N/A N/A N/A N/A Thermal systems between 31 kWth and 260 kWth: 1,000.00 NA 1,000.00 N/A N/A N/A N/A N/A 1,000.00 for first 30kWth +$7 per kWth for each kWth between 31kWth and 260 kWth 7.00 NA 7.00
N/A N/A N/A N/A N/A Thermal systems above 260 kWth: 1,000.00 NA 1,000.00
N/A N/A N/A N/A N/A
1,000.00 for first 30kWth +$7 per kWth for each kWth between 31 kWth and 260 kWth and +$5 per kWth for each kWth above 260 kWth
7.00 5.00
NA
7.00 5.00
Application Surcharges
N/A N/A N/A N/A N/A Comprehensive Planning Fee (Surcharge on all Building Permit Applications)
0.001875 x Project
Valuation NA 0.001875 x
Project Valuation
PLAN CHECKING FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - $0 - $3000 341.00 1.041 355.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - $3001 - $25,000 769.00 1.041 801.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - $25,001 - $50,000 1,054.00 1.041 1,054.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - $50,001 - $100,000 1,887.00 1.041 1,965.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - $100,001 - $500,000 3,258.00 1.041 3,393.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - $500,000 - $1,000,000 5,012.00 1.041 5,219.00 Photovoltaic systems between 51 kW and 250 kW:
1000.00 for first 50kW +$7per kW for each kW between 51 kW and 250 kW
Commercial Solar Energy System
CD - Bldng Reg's, Permits June 16, 2026 2715 Page 10 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC 1&2 FAM - >$1,000,001 $8,954 for the first
$1,000,000 plus
$5.00 for each
additional $1000 or
fraction thereof.
1.041
$9,324 for the
first $1,000,000
plus $5.00 for
each additional
$1000 or fraction
thereof.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - $0 - $3000 354.00 1.041 369.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - $3001 - $25,000 518.00 1.041 539.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - $25,001 - $50,000 939.00 1.041 978.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - $50,001 - $100,000 1,586.00 1.041 1,651.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - $100,001 - $500,000 3,343.00 1.041 3,481.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - $500,000 - $1,000,000 5,949.00 1.041 6,195.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PC ALL OTHER - >$1,000,001 $10,564 for the
first $1,000,000
plus $5.00 for each
additional $1000 or
fraction thereof.
1.041
$11,000 for the
first $1,000,000
plus $5.00 for
each additional
$1000 or fraction
thereof.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OTC Plan Check Revision per 30 minutes / Deferred Submittals 224.00 1.041 233.00 Grading Permit Plan Review Fee
N/A N/A N/A N/A N/A Complex Grading/Changes to Apr. Plans COST N/A COST 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Plan Review 0 to 50 CY 580.00 1.041 604.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Plan Review 51 to 1000 CY 1,166.00 1.041 1,214.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Plan Review 1001 to 10k CY 1,748.00 1.041 1,820.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Plan Review 10,001 CY and Above $2,911 for the first
10,001 CY plus
$5.00 for each
additional 1000 CY
or fraction thereof.
1.041
$3,031 for the
first 10,001 CY
plus $5.00 for
each additional
1000 CY or
fraction thereof.
Grading Inspection/Permit Fee
CD - Bldng Reg's, Permits June 16, 2026 2716 Page 11 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Inspection fee, fixed portion, $200 544.00 1.041 566.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Inspection <= 50 cubic yards 611.00 1.041 636.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grading Inspection >51 cubic yards < 100 cubic yards 628.00 1.041 654.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 608.00 1.041 633.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 23.00 1.041 24.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 812.00 1.041 846.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 18.00 1.041 19.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 1,059.00 1.041 1,103.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 90.00 1.041 94.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Encroachment Agreement -- Private right of way fee (see Engineering section for "Encroachment Agreement -- Public right of way fee")
1,111.00 1.041 1,157.00
N/A N/A N/A N/A N/A Quarterly Fees (C.I.P.) VARIES N/A VARIES
ELECTRICAL INSPECTION FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - $0 - $3000 40.00 1.041 42.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - $3001 - $25,000 50.00 1.041 52.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - $25,001 - $50,000 133.00 1.041 138.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - $50,001 - $100,000 279.00 1.041 291.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - $100,001 - $500,000 448.00 1.041 466.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - $500,000 - $1,000,000 2,303.00 1.041 2,398.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - NEW CONST - >$1,000,001 $3,652 for the first
$1,000,000 plus
$2.50 for each
additional $1000 or
fraction thereof.
1.041
$3,803 for the
first $1,000,000
plus $2.50 for
each additional
$1000 or fraction
thereof.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - $0 - $3000 225.00 1.041 234.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - $3001 - $25,000 256.00 1.041 267.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - $25,001 - $50,000 418.00 1.041 435.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - $50,001 - $100,000 693.00 1.041 722.00 Grading Insp >101 cubic yards < 1,000 cubic yards,
+$19.00 per 100 cubic yards above the
Grading Insp >1001 cubic yards < 10,000 cubic
yards, + $15.00 per 1,000 cubic yards
Grading Insp >10,001 cubic yards, + $76.00 per 10,000 cubic yards
CD - Bldng Reg's, Permits June 16, 2026 2717 Page 12 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - $100,001 - $500,000 954.00 1.041 993.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - $500,000 - $1,000,000 2,303.00 1.041 2,398.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E - ALL OTHER - >$1,000,001 $2,993 for the first
$1,000,000 plus
$2.50 for each
additional $1000 or
fraction thereof.
1.041
$3,117 for the
first $1,000,000
plus $2.50 for
each additional
$1000 or fraction
thereof.
PLUMBING INSPECTION FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - $0 - $3000 40.00 1.041 42.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - $3001 - $25,000 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - $25,001 - $50,000 114.00 1.041 119.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - $50,001 - $100,000 223.00 1.041 232.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - $100,001 - $500,000 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - $500,000 - $1,000,000 3,421.00 1.041 3,562.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - NEW CONST - >$1,000,001 $4,461 for the first
$1,000,000 plus
$2.50 for each
additional $1000 or
fraction thereof.
1.041
$4,645 for the
first $1,000,000
plus $2.50 for
each additional
$1000 or fraction
thereof.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - $0 - $3000 219.00 1.041 228.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - $3001 - $25,000 228.00 1.041 237.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - $25,001 - $50,000 335.00 1.041 349.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - $50,001 - $100,000 530.00 1.041 552.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - $100,001 - $500,000 728.00 1.041 758.00 CD - Bldng Reg's, Permits June 16, 2026 2718 Page 13 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - $500,000 - $1,000,000 3,738.00 1.041 3,892.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 P - ALL OTHER - >$1,000,001 $4,869 for the first
$1,000,000 plus
$2.50 for each
additional $1000 or
fraction thereof.
1.041
$5,070 for the
first $1,000,000
plus $2.50 for
each additional
$1000 or fraction
thereof.
MECHANICAL INSPECTION FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - $0 - $3000 18.00 1.041 19.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - $3001 - $25,000 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - $25,001 - $50,000 78.00 1.041 81.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - $50,001 - $100,000 208.00 1.041 217.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - $100,001 - $500,000 286.00 1.041 298.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - $500,000 - $1,000,000 1,680.00 1.041 1,749.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - NEW CONST - >$1,000,001 $2,529 for the first
$1,000,000 plus
$2.50 for each
additional $1000 or
fraction thereof.
1.041
$2,663 for the
first $1,000,000
plus $2.50 for
each additional
$1000 or fraction
thereof.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - $0 - $3000 219.00 1.041 228.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - $3001 - $25,000 228.00 1.041 237.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - $25,001 - $50,000 312.00 1.041 325.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - $50,001 - $100,000 530.00 1.041 552.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - $100,001 - $500,000 777.00 1.041 809.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - $500,000 - $1,000,000 3,738.00 1.041 3,892.00 CD - Bldng Reg's, Permits June 16, 2026 2719 Page 14 of 81 CURRENT FEE Factor PROPOSED FEE
COMMUNITY DEVELOPMENT - BUILDING PERMITS - PERMITS
City of Richmond
MASTER FEE SCHEDULE
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 M - ALL OTHER - >$1,000,001 $5,818 for the first
$1,000,000 plus
$2.50 for each
additional $1000 or
fraction thereof.
1.041
$6,058 for the
first $1,000,000
plus $2.50 for
each additional
$1000 or fraction
thereof.
FULL COST RECOVERY HOURLY RATES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Inspector 370.00 1.041 385.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Plan Check 446.00 1.041 464.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Permit Technician 249.00 1.041 259.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin / Clerical 233.00 1.041 243.00 Refunds
Cancelled permits are eligible for an 80% refund, upon approval by the Building Official. 20% of the fee is retained to recover the estimated average costs of the City’s administrative and technical efforts required to initiate and facilitate the permitting process.
Plan Check Review fees are non-refundable.
CD - Bldng Reg's, Permits June 16, 2026 2720 Page 15 of 81 CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Miscellaneous Fees
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Registration Fee 106.00 1.041 110.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Initial Inspection Fee -- Per Unit 211.00 1.041 220.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 RRIP/Re-Inspection 90.00 1.041 94.00 Contra Costa County Drainage Area No. 73
Not applicable N/A Not applicable N/A N/A
County’s Drainage Area No. 73 (El Sobrante Valley) --
Varies based on lot size -- The Drainage Area Fee
Ordinances are enacted by the County Board of
Supervisors as the governing body of the Flood Control
District. It requires payment of the Drainage Area Fees (PDF) before the filing of the Final Map for new
subdivisions or prior to issuance of a building permit on an existing legally formed lot.
Varies N/A Varies
Alquist Priolo Geological Study Filing Fee
Uknown N/A Not applicable N/A N/A
Alquist Priolo Geological Study Filing Fee -- Cost (staff time billed at approximately $80 - $100/hour and
consultant time charged at actual cost)
Cost N/A Cost
Residential Rental Dwelling Unit Inspection and Maintenance Last increase
implemented
Index Effective
date for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
Description ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
COMMUNITY DEVELOPMENT - BUILDING PERMITS - MISCELLANEOUS FEES RMC Article VI
MISCELLANEOUS
CD - Building Reg's, Misc. Fees June 16, 2026 2721 Page 16 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
PLANNING (Fee Legend: (D) = Deposit fee, (F) = Flat fee Hourly Rates
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Planning Division Hourly Rate/Plan Check Review 280.00 1.041 292.00 Environmental (CEQA) Review
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Preliminary CEQA Review (F) 250.00 1.041 260.00
N/A N/A N/A N/A N/A
Environmental Impact Report/Negative
Declaration/Mitigated Negative Declaration (City
Administration of Contractor) (F)
30% of total
contract cost N/A 30% of total contract cost
N/A N/A N/A N/A N/A
Consultant Environmental Work (D) Actual Cost - Initial Deposit of $11,000 N/A
Actual Cost -
Initial Deposit of
$11,000
N/A N/A N/A N/A N/A
Consultant Technical Studies (City Administration of
Contractor) (D) Actual Cost - Initial
Deposit of $2,700 N/A
Actual Cost -
Initial Deposit of
$2,700
N/A N/A N/A N/A N/A
Mitigation Monitoring - First year (D) Actual Cost - Initial Deposit of $13,700 N/A
Actual Cost -
Initial Deposit of
$13,700
N/A N/A N/A N/A N/A
Mitigation Monitoring - each subsq year (D) Actual Cost - Initial Deposit of $11,000 N/A
Actual Cost -
Initial Deposit of
$11,000
N/A N/A N/A N/A N/A
Mitigation Monitoring - Large Projects (City administration of Contractor) (D) Actual Cost - Initial
Deposit of $20,000 N/A
Actual Cost -
Initial Deposit of
$20,000
N/A N/A N/A N/A N/A Notice of Determination (Neg Dec & MND) (F) As Set by State N/A As Set by State N/A N/A N/A N/A N/A Notice of Determination EIR (F) As Set by State N/A As Set by State N/A N/A N/A N/A N/A County Documentation Handling Fee (F) As Set by County N/A As Set by County Legislative Actions
N/A N/A N/A N/A N/A
General Plan Amendment or Zoning Amendment (each)
(D) Actual Cost - Initial
Deposit of $13,000 N/A
Actual Cost -
Initial Deposit of
$13,000
N/A N/A N/A N/A N/A
Specific Plan Amendment (D) Actual Cost - Initial
Deposit of $13,000 N/A
Actual Cost -
Initial Deposit of
$13,000
N/A N/A N/A N/A N/A
Development Agreements (D) Actual Cost - Initial
Deposit of $14,000 N/A
Actual Cost -
Initial Deposit of
$14,000
Variance Review
N/A N/A N/A N/A N/A
Variance - Residential (D) Actual Cost - Initial
Deposit of $3,500 N/A
Actual Cost -
Initial Deposit of
$3,500
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
CD - Planning June 16, 2026 2722 Page 17 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
N/A N/A N/A N/A N/A
Variance - Non-Residential (D) Actual Cost - Initial
Deposit of $5,500 N/A
Actual Cost -
Initial Deposit of
$5,500
Letters
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Zoning Verification/Rebuild Letters (F) 564.00 1.041 587.00 Waiver Review
N/A N/A N/A N/A N/A Waiver Review (D) Actual Cost - Initial Deposit of $3,500 N/A
Actual Cost -
Initial Deposit of
$3,500
Subdivision Review
N/A N/A N/A N/A N/A
Lot Line Adjustment, Parcel Merger, Final Map (D) Actual Cost - Initial Deposit of $5,000 N/A
Actual Cost -
Initial Deposit of
$6,500
N/A N/A N/A N/A N/A
Tentative Parcel Map (0 to 4 lots) (D) Actual Cost - Initial Deposit of $6,500 N/A
Actual Cost -
Initial Deposit of
$6,500
N/A N/A N/A N/A N/A
Tentative Subdivision Map (5 to 25 lots) (D) Actual Cost - Initial Deposit of $7,500 N/A
Actual Cost -
Initial Deposit of
$7,500
N/A N/A N/A N/A N/A
Tentative Subdivision Map (26 to 100 lots) (D) Actual Cost - Initial Deposit of $9,500 N/A
Actual Cost -
Initial Deposit of
$9,500
N/A N/A N/A N/A N/A
Tentative Subdivision Map (101 to 200 lots) (D) Actual Cost - Initial Deposit of $14,000 N/A
Actual Cost -
Initial Deposit of
$14,000
N/A N/A N/A N/A N/A
Tentative Subdivision Map (201+ lots) (D) Actual Cost - Initial Deposit of $18,000 N/A
Actual Cost -
Initial Deposit of
$18,000
Zoning Compliance Review
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Accessory Dwelling Unit (attached/detached) (F) 1,408.00 1.041 1,466.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Accessory Dwelling Unit (conversion) (F) 1,124.00 1.041 1,170.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Junior Accessory Dwelling Unit (F) 845.00 1.041 880.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Fence (F) 281.00 1.041 293.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Residential Fence (4 feet or less - Front) (F) 69.00 1.041 72.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Business License -Zoning Clearance (F)/HOP 69.00 1.041 72.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sign-Change of Copy (F) 69.00 1.041 72.00 Tobacco Retail License NEW
N/A N/A N/A N/A N/A Initial Tobacco Retail License Application (F) NEW NEW $1,460 N/A N/A N/A N/A N/A Annual Tobacco Retail License (F) NEW NEW $730 N/A N/A N/A N/A N/A Tobacco Retail Appeal (F) NEW NEW $1,168 N/A N/A N/A N/A N/A Revocation (F) NEW NEW $2,044
CD - Planning June 16, 2026 2723 Page 18 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
N/A N/A N/A N/A N/A Suspension (F) New NEW $1,460
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Business License/Home Occupation Permit (F) 69.00 1.041 72.00 Historic Resource Review
N/A N/A N/A N/A N/A Certificate of Appropriateness - Minor (D) Actual Cost - Initial Deposit of $2,500 N/A
Actual Cost -
Initial Deposit of
$2,500
N/A N/A N/A N/A N/A Certificate of Appropriateness - Major (D) Actual Cost - Initial Deposit of $3,500 N/A
Actual Cost -
Initial Deposit of
$3,500
N/A N/A N/A N/A N/A Mills Act Contract (D) Actual Cost - Initial Deposit of $5,000 N/A
Actual Cost -
Initial Deposit of
$5,000
N/A N/A N/A N/A N/A Landmark Designation(D) Actual Cost - Initial Deposit of $2,500 N/A
Actual Cost -
Initial Deposit of
$2,500
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Demolition Permit Review (F) 450.00 1.041 469.00 Use Permit Review
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Use Permit (F) 2,566.00 1.041 2,672.00
N/A N/A N/A N/A N/A
Temporary Use Permit (D) Actual Cost - Initial
Deposit of $1,500 N/A
Actual Cost -
Initial Deposit of
$1,500
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Conditional Use Permit - Wireless Facility (CUP Renewal & Minor modifications) (F) 7,029.00 1.041 7,319.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Conditional Use Permit - Wireless Facility (New) (F) 9,840.00 1.041 10,246.00 N/A N/A N/A N/A N/A Conditional Use Permit - Small Cell Site Node (F) 4,948.75 N/A 4,948.75 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Conditional Use Permit - Eating Establishment w/ ABC License (Beer & Wine Only) (F) 2,566.00 1.041 2,672.00
N/A N/A N/A N/A N/A
Conditional Use Permit - Eating Establishment w/ ABC
License (Beer, Wine & Spirits) (D) Actual Cost - Initial Deposit of $3,000 N/A
Actual Cost -
Initial Deposit of
$3,000
N/A N/A N/A N/A N/A
Conditional Use Permit - All Other Uses (D) Actual Cost - Initial Deposit of $5,000 N/A
Actual Cost -
Initial Deposit of
$5,000
N/A N/A N/A N/A N/A
Conditional Use Permit - Amendment (D) Actual Cost - Initial Deposit of $3,000 N/A
Actual Cost -
Initial Deposit of
$3,000
N/A N/A N/A N/A N/A
Conditional Use Permit - Compliance Review (D) Actual Cost - Initial Deposit of $5,000 N/A
Actual Cost -
Initial Deposit of
$5,000
N/A N/A N/A N/A N/A
Revocation Review (D) Actual Cost - Initial
Deposit of $5,000 N/A
Actual Cost -
Initial Deposit of
$5,000
CD - Planning June 16, 2026 2724 Page 19 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Commercial Cannabis - Application Completeness Review-per application - (F) 1,109.00 1.041 1,155.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Commercial/Industrial Cannabis Activity- Conditional Use Permit - (F) 13,717.00 1.041 14,283.00
Design Review (Residential Projects) - Over the Counter 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Design Review - Over the Counter - Accessory Structure (250 sf or less) (F) 421.00 1.041 438.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Design Review - Over the Counter - Small Addition (500 sf or less, under 15 ft height) (F) 703.00 1.041 732.00 Design Review (Residential Projects) - Minor/Administrative 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Residential Design Review - Administrative - Fence (over basic height) (F) 481.00 1.041 501.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Residential Design Review - Administrative - Medium Addition (501 - 1200 sf, under 15 ft height) (F) 1,538.00 1.041 1,601.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Residential Design Review - Administrative - Single Family/Duplex (501 - 1200 sf, under 15 ft height) (F) 2,885.00 1.041 3,004.00 Design Review (Residential Projects) - Major Design Review (Design Review Board)
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Accessory Structure (251 sf or more) (D) Actual Cost - Initial Deposit of $1,250 N/A
Actual Cost -
Initial Deposit of
$1,250
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Medium Addition (501 - 1200 sf, over 15 ft height) (D) Actual Cost - Initial Deposit of $1,650 N/A
Actual Cost -
Initial Deposit of
$1,650
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Large addition (1200 sf or more) (D) Actual Cost - Initial Deposit of $2,350 N/A
Actual Cost -
Initial Deposit of
$2,350
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Single-family/Duplex (1200 sf or more) (D) Actual Cost - Initial Deposit of $4,400 N/A
Actual Cost -
Initial Deposit of
$4,400
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Multifamily (3-10 units) (D) Actual Cost - Initial
Deposit of $8,500 N/A
Actual Cost -
Initial Deposit of
$8,500
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Multifamily (10-25 units) (D) Actual Cost - Initial
Deposit of $10,500 N/A
Actual Cost -
Initial Deposit of
$10,500
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Multifamily (26-100 units) (D) Actual Cost - Initial
Deposit of $12,500 N/A
Actual Cost -
Initial Deposit of
$12,500
N/A N/A N/A N/A N/A
Residential Design Review - Design Review Board -
Multifamily (100+ units) (D) Actual Cost - Initial
Deposit of $15,500 N/A
Actual Cost -
Initial Deposit of
$15,500
Design Review (Commercial/Industrial Projects) - Over the Counter CD - Planning June 16, 2026 2725 Page 20 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Over the Counter - Solar Panel Install (F) 564.00 1.041 587.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Over the Counter - Small Addition or Improvement (1000 sf or less) (F) 1,124.00 1.041 1,170.00 Design Review (Commercial/Industrial Projects) - Minor Design Review (Administrative) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Alteration or addition (<30% of existing floor area) (F) 3,375.00 1.041 3,514.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Small New Construction (2000 sf or less) (F) 4,499.00 1.041 4,685.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Temporary Structure(s) (F) 5,625.00 1.041 5,857.00
Design Review (Commercial/Industrial Projects) - Major Design Review (Design Review Board)
N/A N/A N/A N/A N/A
Non-residential Design Review - Design Review Board -
Medium Addition or improvement (2,001 sf -4,999 sf) (D) Actual Cost - Initial Deposit of $6,500 N/A
Actual Cost -
Initial Deposit of
$6,500
N/A N/A N/A N/A N/A
Non-residential Design Review - Design Review Board -
Large Addition or Improvement (5,000 sf or more) (D) Actual Cost - Initial Deposit of $8,500 N/A
Actual Cost -
Initial Deposit of
$8,500
N/A N/A N/A N/A N/A
Non-residential Design Review - Design Review Board -
Large New Construction (5,001 sf or more) (D) Actual Cost - Initial Deposit of $10,500 N/A
Actual Cost -
Initial Deposit of
$10,500
Sign Permits
N/A N/A N/A N/A N/A
Non-residential Design Review - Administrative - Master Sign Program (D) Actual Cost - Initial
Deposit of $3,500 N/A
Actual Cost -
Initial Deposit of
$3,500
N/A N/A N/A N/A N/A
Non-residential Design Review - Design Review BoardSign Variance (D) Actual Cost - Initial Deposit of $1,650 N/A
Actual Cost -
Initial Deposit of
$1,650
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Administrative - Window, Blade, Wall or Awning Sign (F) 448.00 1.041 466.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Administrative - Free Standing Sign (F) 2,886.00 1.041 3,005.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Non-residential Design Review - Administrative - Multiple Temporary Sign (F) 321.00 1.041 334.00
Appeals
N/A N/A N/A N/A N/A
Appeals - ZA (F) $350 or $150 if
appealed by the
corresponding
Neighborhood
Council
N/A
$350 or $150 if
appealed by the
corresponding
Neighborhood
Council
CD - Planning June 16, 2026 2726 Page 21 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
N/A N/A N/A N/A N/A
Appeals - DRB (F) $350 or $150 if
appealed by the
corresponding
Neighborhood
Council
N/A
$350 or $150 if
appealed by the
corresponding
Neighborhood
Council
N/A N/A N/A N/A N/A
Appeals - PC (F) $500 or $150 if
appealed by the
corresponding
Neighborhood
Council
N/A
$500 or $150 if
appealed by the
corresponding
Neighborhood
Council
Other Requests
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Off site Plan / File Retrieval (F) 65.00 1.041 68.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Permit Time Extension (F) 1,405.00 1.041 1,463.00 N/A N/A N/A N/A N/A Modification of Approved Plans and Conditions of Approval
N/A N/A N/A N/A N/A Minor Modifications (D) 25% of project fee N/A 25% of project fee
N/A N/A N/A N/A N/A Major Modifications (D) 50% of project fee N/A 50% of project fee N/A N/A N/A N/A N/A Pre-Application Review (D) $5,000 N/A $5,000 N/A N/A N/A N/A N/A SB35 Housing Project (D) $25,000 N/A $25,000 N/A N/A N/A N/A N/A SB330 Housing Project (D) $15,000 N/A $15,000 Engineering Improvement Plan Review - City Planning Administrative Fee 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $0 - $3,000 (F) 564.00 1.041 587.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $3,001 - $25,000 (F) 1,124.00 1.041 1,170.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $25,001 - $50,000 (F) 2,250.00 1.041 2,343.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $50,001 - $100,000 (F) 3,094.00 1.041 3,222.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $100,001 - $500,000 (F) 4,220.00 1.041 4,394.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $500,001 - $1,000,000 (F) 6,468.00 1.041 6,735.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $1,000,001 - $5,000,000 (F) 8,437.00 1.041 8,785.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $5,000,001 - $10,000,000 (F) 10,124.00 1.041 10,542.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $10,000,001 - $20,000,000 (F) 12,657.00 1.041 13,180.00 Note: Fee is for Planning's facilitation of non-structural Engineering projects. Fee is based on the value of nonstructural engineering improvements. Contractor expenses will be passed through on top of the
administrative fee.
Landscape Plan Check - City Planning Administrative Fee 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $0 - $3,000 (F) 564.00 1.041 587.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $3,001 - $25,000 (F) 1,124.00 1.041 1,170.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $25,001 - $50,000 (F) 1,688.00 1.041 1,758.00 CD - Planning June 16, 2026 2727 Page 22 of 81
COMMUNITY DEVELOPMENT - PLANNING
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $50,001 - $100,000 (F) 2,250.00 1.041 2,343.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $100,001 - $500,000 (F) 3,375.00 1.041 3,514.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $500,001 - $1,000,000 (F) 4,499.00 1.041 4,685.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $1,000,001 - $5,000,000 (F) 5,625.00 1.041 5,857.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $5,000,001 - $10,000,000 (F) 7,030.00 1.041 7,320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 $10,000,001 - $20,000,000 (F) 8,437.00 1.041 8,785.00 Note: Fee is for Planning's facilitation of Landscape Plan Check. Fee is based on value of landscape
improvements. Contractor expenses will be passed
through on top of the administrative fee.
CD - Planning June 16, 2026 2728 Page 23 of 81
COMMUNITY DEVELOPMENT - RICHMOND COMMUNITY DEVELOPMENT DEPARTMENT HOUSING - PERMIT FEES CURRENT FEE Factor PROPOSED FEE
Richmond Community Development Department
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Single Family/Condo/Townhouse 594.00 1.041 618.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Multi-Family (Developer) Property less than 10 years old 1,139.00 1.041 1,186.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Multi-Family (Developer) Property 10+ years old 1,496.00 1.041 1,557.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Redraw Fee (Revisions) Single Family/Condo/Townhouse 89.00 1.041 93.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Redraw Fee (revisions) Multi-Family (Developer) 266.00 1.041 277.00 Demand Statement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Demand Statement 183.00 1.041 191.00 Re-conveyance Fee
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Property less than 10 years old 183.00 1.041 191.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Property 10+ years old 279.00 1.041 290.00 Recording Fee
N/A N/A Not applicable N/A N/A
Recording Fee per property Per County
Recorder Schedule N/A
Per County
Recorder
Schedule
Notary Fee
N/A N/A Not applicable N/A N/A Notary Fee per property Fees set by State N/A Fees set by State Marina Shores Property Management
Subordination Processing Fee
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Single Family/Condo/Townhouse - Assignment or Subordination 594.00 1.041 618.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Redraw Fee (Revisions) Single Family/Condo/Townhouse 89.00 1.041 93.00
Demand Statement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Demand Statement/Ground Lease Payoff 183.00 1.041 191.00 Reconveyance Fee
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Property less than 10 years old 183.00 1.041 191.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Property 10+ years old 279.00 1.041 290.00 Other Fees
City of Richmond
MASTER FEE SCHEDULE
Description
Housing Division Fees/Portfolio Management
Subordination Processing Fee
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
CD - Housing Division June 16, 2026 2729 Page 24 of 81
COMMUNITY DEVELOPMENT - RICHMOND COMMUNITY DEVELOPMENT DEPARTMENT HOUSING - PERMIT FEES CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Fees by external department/agencies Actual cost as set by external
dept/agency
actual
cost
Actual cost as set
by external
dept/agency
Legal Review Fees Actual cost as set
by external
dept/agency
actual
cost
Actual cost as set
by external
dept/agency
CD - Housing Division June 16, 2026 2730 Page 25 of 81
COMMUNITY DEVELOPMENT - COMMERCIAL CANNABIS REGULATORY FEES CURRENT FEE Factor PROPOSED FEE
Commercial Cannabis Regulatory Fees
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Application Completeness Review-per application 1,109.00 1.041 1,155.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Conditional Use Permit-per application 13,720.00 1.041 14,286.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Cannabis Business Permit-per application 4,637.00 1.041 4,828.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Retail Storefront)-per permit annually 3,661.00 1.041 3,812.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Retail Delivery)-per permit annually 3,661.00 1.041 3,812.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Distribution)-per permit annually 3,661.00 1.041 3,812.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Manufacturing)-per permit annually 3,902.00 1.041 4,063.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Specialty/Cottage Cultivation)-per permit annually 3,661.00 1.041 3,812.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Small Cultivation)-per permit annually 3,902.00 1.041 4,063.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Medium Cultivation)-per permit annually 4,144.00 1.041 4,315.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Large Cultivation)-per permit annually 4,384.00 1.041 4,565.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Nursery Cultivation)-per permit annually 3,661.00 1.041 3,812.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Processor Cultivation)-per permit annually 3,661.00 1.041 3,812.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit Fee (Testing)-per permit annually 3,661.00 1.041 3,812.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Reinspection Fee-per inspection 1,592.00 1.041 1,658.00 Notes:
1 - Fees are rounded to the nearest dollar
2 - Each additional permit for the same business at the same location shall be charged 50% of the applicable fee. The highest activity use fee shall be the first base fee. *ECI - Employment Cost Index (Bureau of Labor Statistics) City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
CD - Comm. Cannabis Regu. June 16, 2026 2731 Page 26 of 81
COMMUNITY DEVELOPMENT - CODE ENFORCEMENT FEES
CURRENT FEE Factor PROPOSED FEE
CODE ENFORCEMENT
N/A N/A N/A N/A N/A
Videodisks -- charged at cost for time and materials. Average approximate cost begins at $25 for one tape, $40 for two tapes (same footage) (materials and man hours)
Actual Cost N/A Actual Cost
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Inspection Warrant 1,231.00 1.041 1,282.00 N/A N/A N/A N/A N/A Appeal to Hearing Officer Cost of Citation N/A Cost of Citation 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative fee for site clean-up 816.00 1.041 850.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative fee for board up 816.00 1.041 850.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Re-inspection 166.00 1.041 173.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Abatement Warrant 1,447.00 1.041 1,507.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Lien and Special Assessment 2,893.00 1.041 3,012.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Release of Recordation Processing Fee 508.00 1.041 529.00 Vacant Dwellings or Buildings
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Vacant Property Registration 248.00 1.041 258.00 N/A N/A N/A N/A N/A Permit to secure the building, calculated based on building valuation and square footage
Calculate based on
valuation N/A Calculate based
on valuation
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Per month fee to cover the staff time and cost to monitor our chronically vacant property inventory 664.00 1.041 691.00
ALCOHOL AND TOBACCO RETAIL INSPECTIONS
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Cost per business of compliance inspection 960.00 1.041 1,000.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Compliance inspection of alcohol and/or tobacco retailer 960.00 1.041 1,000.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Combined inspection of alcohol and tobacco retailer 1,469.00 1.041 1,530.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Re-inspection of alcohol and/or tobacco retailer 249.00 1.041 259.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Underage sales investigation of alcohol and/or tobacco retailer 911.00 1.041 949.00
Taxi Permits (Scripts Only)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 New driver 226.00 1.041 235.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual renewal 150.00 1.041 156.00 City of Richmond
MASTER FEE SCHEDULE
Description Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
CD - Code Enforcement June 16, 2026 2732 Page 27 of 81
CITY CLERK'S OFFICE, CITY ATTORNEY'S OFFICE, AND CITY MANAGER'S OFFICE FEES CURRENT FEE Factor PROPOSED FEE
CITY ATTORNEY
Not applicable N/A Not applicable N/A N/A Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10 Not applicable N/A Not applicable N/A N/A Deposition witness fees per California Code, Government Code - GOV § 68097.2(b) 275.00 N/A 275.00
Not applicable N/A Not applicable N/A N/A Subpoena for written records per California Code, Evidence Code - EVID § 1563 (b)(6) 15.00 N/A 15.00
CITY CLERK
Not applicable N/A Not applicable N/A N/A Appeal Filing Fees -- appeal a decision to a City Board 150.00 N/A 150.00 Not applicable N/A Not applicable N/A N/A Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10 Not applicable N/A Not applicable N/A N/A Richmond Municipal Code Full Copy 250.00 N/A 250.00 Not applicable N/A Not applicable N/A N/A Richmond Municipal Code Supplements 40.00 N/A 40.00
CITY MANAGER
Not applicable N/A Not applicable N/A N/A Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10 ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Last increase
implemented
City of Richmond
MASTER FEE SCHEDULE
Description
Index Effective
date for
proposed
increase
City Clerk_Attorney_Manager June 16, 2026 2733 Page 28 of 81
COMMUNITY SERVICES - RECREATION FEES
NEW +25%
CURRENT FEE Factor PROPOSED
RESIDENT FEES
PROPOSED
NON-RESIDENT
Gov't
Discount -
50%
RICHMOND
NON-PROFIT
DISCOUNT -
25%
1 Cancellation more than 30 days prior to event, all fees and deposit will be refunded less the administrative costs associated with the reservation and event planning.
1.00 N/A 1.00 1.00 50% 25%
2 Cancellation 30 days or less prior to event, no refund of deposit - N/A - -
3 Richmond Convention Center
4 1-May-2022 150.70 1-Jul-2023 160.30 1.064 5 Replacement Charge per item for lost, damaged, and unreturned materials. Cost 1.000 Cost Cost N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 6 Deposit--$3000 minimum (may be higher) 3,081.00 1.000 3,081.00 3,851.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 7 Deposit--Concerts $5000 minimum (may be higher) Fees to be determined 5,135.00 1.000 5,135.00 6,419.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 8 Friday – Sunday, hourly 1,061.00 1.000 1,061.00 1,326.00 $531.00 $796.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 9 Monday – Thursday, hourly 848.00 1.000 848.00 1,060.00 $424.00 $636.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 10 Rental: Memorial Auditorium Main Floor 1-May-2022 150.70 1-Jul-2023 160.30 1.064 11 Deposit--$3000 minimum (may be higher) 3,081.00 1.000 3,081.00 3,851.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 12 Friday – Sunday, hourly (Whole Main Floor) 642.00 1.000 642.00 803.00 $321.00 $482.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 13 Monday – Thursday, hourly (Whole Main Floor) 514.00 1.000 514.00 643.00 $257.00 $386.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 14 Bingo, 8-hour max., daily 2,054.00 1.000 2,054.00 2,568.00 NA NA NA NA NA Deposit--$1500 minimum (may be higher) New New 1,500.00 1,875.00 $750.00 $1,125.00 NA NA NA NA NA Friday - Sunday, hourly (Half Main Floor) New New 321.00 401.00 $161.00 $241.00 NA NA NA NA NA Monday – Thursday, hourly (Half Main Floor) New New 257.00 321.00 $129.00 $193.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 15 Rental: Bermuda/Catalina 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 16 Deposit--$500 minimum (may be higher) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 17 Friday – Sunday, hourly 313.00 1.000 313.00 391.00 $157.00 $235.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 18 Monday – Thursday, hourly 251.00 1.000 251.00 314.00 $126.00 $188.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 19 Rental: Terrace Rooms (C/D/E/F/G/H) 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 20 Deposit--$250 minimum (may be higher) 257.00 1.000 257.00 321.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 21 First Room Monday - Thursday Hourly 124.00 1.000 124.00 155.00 $62.00 $93.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 22 Additional Terrace Room Monday - Thursday, hourly 52.00 1.000 52.00 65.00 $26.00 $39.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 23 First Room Friday - Sunday Hourly 155.00 1.000 155.00 194.00 $78.00 $116.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 24 Additional Terrace Room Friday - Sunday, hourly 66.00 1.000 66.00 83.00 $33.00 $50.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 25 Rental: Convention Center Lobby 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 26 Deposit--$500 minimum (may be higher) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 27 Monday – Thursday, hourly 251.00 1.000 251.00 314.00 $126.00 $188.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 28 Friday – Sunday, hourly 313.00 1.000 313.00 391.00 $157.00 $235.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 29 Rental: Convention Center Kitchen and Dressing Rooms, Ticket Booth 1-May-2022 150.70 1-Jul-2023 160.30 1.064 30 Shared use Monday - Thursday, daily (with event booking) 106.00 1.000 106.00 133.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 31 Shared use Friday - Sunday, daily (with event booking) 132.00 1.000 132.00 165.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 32 Sole use Monday - Thursday, daily (with event booking) 165.00 1.000 165.00 206.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 33 Sole use Friday - Sunday, daily (with event booking) 206.00 1.000 206.00 258.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 34 Sole use Monday - Thursday, flat fee, 6 hours max. (without event booking) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 35 Sole use Friday - Sunday, flat fee, 6 hours max. (without event booking) 642.00 1.000 642.00 803.00 N/A N/A
City of Richmond
MASTER FEE SCHEDULE
Rental fees includes 2 contracted attendants & janitorial supplies. Minimum of four (4) hours rental.
Rental fees includes 1 contracted attendant & janitorial supplies. Minimum of three (3) hours rental.
Rental fees includes 2 contracted attendants & janitorial supplies. Minimum of four (4) hours rental.
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
COMMUNITY SERVICES
Rental fees includes 3 contracted attendants & janitorial supplies. Additional attendants fee maybe charged as needed per Convention Center Staff's assessment. Minimum of four (4) hours rental.
Rental: Convention Center Complex: Includes the Main Floor, Lobby , Bermuda Room and Terrace Rooms (C/D/E/F/G/H). Excludes the Kitchen and Dressing Rooms which may be rented separately.
CS - Recreation June 16, 2026 2734 Page 29 of 81
COMMUNITY SERVICES - RECREATION FEES
NEW +25%
CURRENT FEE Factor PROPOSED
RESIDENT FEES
PROPOSED
NON-RESIDENT
Gov't
Discount -
50%
RICHMOND
NON-PROFIT
DISCOUNT -
25%
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
1-May-2022 150.70 1-Jul-2023 160.30 1.064 36 Deposit for sole use, without event booking 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 37 Dressing Room-Band/Chorus Room Monday to Thursday, daily (w/event booking) 65.00 1.000 65.00 81.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 38 Dressing Room--Band/Chorus Room Friday to Sunday, daily (w/event booking) 81.00 1.000 81.00 101.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 39 Individual Dressing Room, upstairs, Monday to Thursday, daily (w/event booking) 34.00 1.000 34.00 43.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 40 Individual Dressing Room, upstairs, Friday to Sunday, daily (w/event booking) 42.00 1.000 42.00 53.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 41 Ticket Booth, Monday to Thursday, daily 52.00 1.000 52.00 65.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 42 Ticket Booth, Friday to Sunday, daily 66.00 1.000 66.00 83.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 43 Community Center Rooms 1-May-2022 150.70 1-Jul-2023 160.30 1.064 44
1-May-2022 150.70 1-Jul-2023 160.30 1.064 45 Deposit--$500 minimum (may be higher) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 46 Social Hall - hourly (RRC) 158.00 1.000 158.00 198.00 $79.00 $119.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 47 Deposit--$500 minimum (may be higher) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 48 Social Hall - hourly (NEVIN) 139.00 1.000 139.00 174.00 $70.00 $104.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 49 Deposit--$500 minimum (may be higher) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 50 Socia Hall - hourly (PARCHESTER, SHIELDS REID) 119.00 1.000 119.00 149.00 $60.00 $89.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 51
1-May-2022 150.70 1-Jul-2023 160.30 1.064 52 Deposit--$250 minimum (may be higher) 257.00 1.000 257.00 321.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 53 Multi Purpose Room - hourly (BTA and NEVIN) 104.00 1.000 104.00 130.00 $52.00 $78.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 54
1-May-2022 150.70 1-Jul-2023 160.30 1.064 55 Deposit--$250 minimum (may be higher) 257.00 1.000 257.00 321.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 56 Conference Room - hourly (NCC,BTA,PCC,SRCC, Senior Center,Annex) 83.00 1.000 83.00 104.00 $42.00 $62.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 57 Field Permits 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 58 Non League Deposit--$100 minimum (may be higher) 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 59 League Deposit--$300 minimum (may be higher) 308.00 1.000 308.00 385.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 60 Youth Sports, hourly 28.00 1.000 28.00 35.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 61 Adult Sports, hourly (Excluding Adult Baseball) 41.00 1.000 41.00 51.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 62 Adult Baseball, hourly 73.00 1.000 73.00 91.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 63 Tennis Courts 1-May-2022 150.70 1-Jul-2023 160.30 1.064 64 Deposit--$100 minimum (may be higher) 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 65 Tennis Courts, hourly 16.00 1.000 16.00 20.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 66 MLK Artificial Turf Field 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 67 Non League Deposit--$100 minimum (may be higher) 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 68 League Deposit--$300 minimum (may be higher) 308.00 1.000 308.00 385.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 69 Youth Sports, hourly 41.00 1.000 41.00 51.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 70 Adult Sports, hourly 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 71 Track - Youth, hourly 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 72 Track - Adult, hourly 41.00 1.000 41.00 51.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 73 Gymnasiums 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 74 Deposit--$250 minimum (may be higher) 257.00 1.000 257.00 321.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 75 Gymnasium, hourly (BTA, RRC) 152.00 1.000 152.00 190.00 $76.00 $114.00 As Social Hall
1-May-2022 150.70 1-Jul-2023 160.30 1.064 76 Deposit--$500 minimum (may be higher) 514.00 1.000 514.00 643.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 77 Gymnasium, as Social Hall, hourly (BTA, RRC) 259.00 1.000 259.00 324.00 $130.00 $194.00 Social Hall for 75 to 190 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.
Rental fees includes 1 contracted attendants & janitorial supplies.
Rental fees includes 1 trash can and maintenance fee.
Rental fees includes 1 trash can and maintenance fee.
Conference Room for 20 to 30 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.
Multi Purpose Room- Maximum 50 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.
CS - Recreation June 16, 2026 2735 Page 30 of 81
COMMUNITY SERVICES - RECREATION FEES
NEW +25%
CURRENT FEE Factor PROPOSED
RESIDENT FEES
PROPOSED
NON-RESIDENT
Gov't
Discount -
50%
RICHMOND
NON-PROFIT
DISCOUNT -
25%
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
1-May-2022 150.70 1-Jul-2023 160.30 1.064 78 Park Reservations 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 79 Deposit--$100 minimum (may be higher) 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 80 Groups of 50 or less participants, for general use, hourly (Includes 2 Trash Cans) 31.00 1.000 31.00 39.00 $16.00 N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 81 Deposit--$150 minimum (may be higher) 154.00 1.000 154.00 193.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 82
Groups of 51 to 100 participants, for general or
fundraiser/commercial use, hourly (Includes 4 Trash
Cans)
63.00 1.000 63.00 79.00 $32.00 N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 83 Deposit--$150 minimum (may be higher) 154.00 1.000 154.00 193.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 84
Groups of 101 to 199 participants, for general or
fundraiser/commercial use, hourly (Includes 8 Trash
Cans)
83.00 1.000 83.00 104.00 $42.00 N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 85 Deposit--$150 minimum (may be higher) 154.00 1.000 154.00 193.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 86 Groups of 200+ participants, for festivals and/or major celebrations, hourly (Includes 12 Trash Cans) 124.00 1.000 124.00 155.00 $62.00 N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 87 Civic Center Plaza 1-May-2022 150.70 1-Jul-2023 160.30 1.064 88 Deposit--$1000 minimum (may be higher) 1,027.00 1.000 1,027.00 1,284.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 89 Rental fee, hourly for groups of 100+ 205.00 1.000 205.00 256.00 $103.00 N/A NA NA NA NA NA Deposit--$500 minimum (may be higher) New New 500.00 625.00 $250.00 NA NA NA NA NA Rental Fee for less than 100 participants New New 63.00 79.00 $32.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 90 Picnic Areas 1-May-2022 150.70 1-Jul-2023 160.30 1.064 91 Deposit--$100 for 50 and under, minimum (may be higher) 103.00 1.000 103.00 129.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 92 Deposit--$150 for 51 and over, minimum (may be higher) 154.00 1.000 154.00 193.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 93
Nicholl, Country Club Vista, Barbara & Jay Vincent -
Picnic Area, hourly ( three (3) hours minimum rental),
Includes 2 Trash Cans
39.00 1.000 39.00 49.00 $20.00 N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 94 Marina Bay Park, Shimada Park - Picnic Table, per day.
Park standard fees will apply 27.00 1.000 27.00 34.00 $14.00 N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 95 Aquatic Fees - Commercial use by special arrangement 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 96 Deposit--$250 minimum (may be higher) 257.00 1.000 257.00 321.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 97 Pool Rental , Monday to Thursday, hourly 154.00 1.000 154.00 193.00 $77.00 $116.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 98 Pool Rental , Friday to Sunday, hourly 193.00 1.000 193.00 241.00 $97.00 $145.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 99 Pool Lane Rental, Monday to Thursday, hourly 47.00 1.000 47.00 59.00 $24.00 $35.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 100 Pool Lane Rental, Friday to Sunday, hourly 60.00 1.000 60.00 75.00 $30.00 $45.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 101
RSC Outdoor Picnic Area Only (No Pool), Monday to
Thursday, rental only during Recreation Swim Session,
maximum of 50 guests, seating for 36 at picnic tables.
92.00 1.000 92.00 115.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 102
RSC Outdoor Picnic Area Only (No Pool), Friday to
Sunday, rental only during Recreation Swim Session,
maximum of 50 guests, seating for 36 at picnic tables.
116.00 1.000 116.00 145.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 103 RSC Outside Pool plus Picnic Area, Monday to Thursday, hourly -two (2) hours minimum rental 154.00 1.000 154.00 193.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 104 RSC Outside Pool plus Picnic Area, Friday to Sunday, hourly -two (2) hours minimum rental 193.00 1.000 193.00 241.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 105 Rental Extra Fees, All fees are each/ per day unless stated otherwise The hourly rental fee includes pool lifeguards for up to 25 guests but additional lifeguards maybe required due to risk involved as determined by the pool coordinator. Parties larger than 25 guests will be charged additional fees to cover the cost of additional lifeguards.
Standard Fees Reservation of Nicholl, Country Club Vista, Marina Bay, Barbara & Jay Vincent, and Shimada is limited to the picnic areas, except by special arrangement. Permission is required for amplified sound at all parks. All rental reservation requires a General Liability Insurance Coverage. Special Event Permit application must be completed.
CS - Recreation June 16, 2026 2736 Page 31 of 81
COMMUNITY SERVICES - RECREATION FEES
NEW +25%
CURRENT FEE Factor PROPOSED
RESIDENT FEES
PROPOSED
NON-RESIDENT
Gov't
Discount -
50%
RICHMOND
NON-PROFIT
DISCOUNT -
25%
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
1-May-2022 150.70 1-Jul-2023 160.30 1.064 106 Alcohol Sales Permit 132.00 1.000 132.00 165.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 107 Alcohol Service Only 67.00 1.000 67.00 84.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 108 Chairs 1.00 1.000 1.00 1.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 109 Convention Center Major Events Cleaning Fee, Per Rental 514.00 1.000 514.00 643.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 110 Contracted Attendant Fee ( Per Hour) 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 111 Convention Center Holiday Decoration Per Rental 205.00 1.000 205.00 256.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 112 Field Drag & line, Per Request 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 113 Field Light (Per Hour) 21.00 1.000 21.00 26.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 114 Field Maintenance Fee - Long Range, Per Rental (10-12 months rentals) 205.00 1.000 205.00 256.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 115 Field Maintenance Fee, Per Use (Monthly Rentals) 21.00 1.000 21.00 26.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 116 Field Soccer Goal Equipment Setup, Per Request 62.00 1.000 62.00 78.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 117 Jumper Permit 41.00 1.000 41.00 51.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 118 Kitchen use-Community Center 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 119 Kitchen use-Senior Center 106.00 1.000 106.00 133.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 120 Lifeguard, Per Hour 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 121 Microphone - Cordless 59.00 1.000 59.00 74.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 122 Piano - Baby Grand 65.00 1.000 65.00 81.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 123 Piano - Grand 126.00 1.000 126.00 158.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 124 Podium with sound 99.00 1.000 99.00 124.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 125 Podium without sound 36.00 1.000 36.00 45.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 126 Projector 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 127 Projector Screen 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 128 Riser 21.00 1.000 21.00 26.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 129 Scoreboard Equipment 15.00 1.000 15.00 19.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 130 Sound Permit 27.00 1.000 27.00 34.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 131 Tables- Rectangle/ Round 4.00 1.000 4.00 5.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 132 Trash Can 10.00 1.000 10.00 13.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 133 Wet Bar-Fixed 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 134 Wet Bar-Portable 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 135 Administrative Fees 1-May-2022 150.70 1-Jul-2023 160.30 1.064 136 Application Fee - Rentals 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 137 Application Short Notice Fee (Application fee must be received 30 days prior to event) 26.00 1.000 26.00 33.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 138 Gross Concessions-Alcohol (Per Assessed Number of Attendee) 1.00 1.000 1.00 1.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 139 Gross Concessions-all sales excluding alcohol (Per Assessed Number of Attendee) 1.00 1.000 1.00 1.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 140 Gross Ticket Sale (Per Assessed Number of Attendee) 1.00 1.000 1.00 1.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 141 Marquee weekly rental 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 142 Rental Amendment Fee (any changes on approved contract) 26.00 1.000 26.00 33.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 143 Rental Event Date Change Fee 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 144 Film Permits 1-May-2022 150.70 1-Jul-2023 160.30 1.064
1-May-2022 150.70 1-Jul-2023 160.30 1.064 145 Still Photography, daily 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 146 Music Videos, Industrial, Web Content, daily 103.00 1.000 103.00 129.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 147 Commercial, Corporate, Short Films, Featur, Television, daily 154.00 1.000 154.00 193.00 N/A N/A
1-May-2022 150.70 1-Jul-2023 160.30 1.064 148 BOOTHS AND FESTIVALS, EACH/PER DAY - 1-May-2022 150.70 1-Jul-2023 160.30 1.064 149 Non-profit information/crafts 56.00 1.000 56.00 70.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 150 Non-profit food vendor (includes permit) 243.00 1.000 243.00 304.00 N/A N/A Fees are waived for Student Project but requires an applicable school letter confirming project. If filming at the City of Richmond facilities, rental fees will apply in addition to film permit fees.
CS - Recreation June 16, 2026 2737 Page 32 of 81
COMMUNITY SERVICES - RECREATION FEES
NEW +25%
CURRENT FEE Factor PROPOSED
RESIDENT FEES
PROPOSED
NON-RESIDENT
Gov't
Discount -
50%
RICHMOND
NON-PROFIT
DISCOUNT -
25%
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
1-May-2022 150.70 1-Jul-2023 160.30 1.064 151 Commercial food vendor (includes permit) 359.00 1.000 359.00 449.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 152 Commercial merchandise 113.00 1.000 113.00 141.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 153 SPECIAL EVENT PERMIT FEES, All fees are per rental unless stated otherwise 1-May-2022 150.70 1-Jul-2023 160.30 1.064 154 Application Fee 31.00 1.000 31.00 39.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 155 Application Short Notice Fee (Application fee must be received 30 days prior to event) 26.00 1.000 26.00 33.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 156 Alcohol Sales Permit 132.00 1.000 132.00 165.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 157 Alcohol Service Only 67.00 1.000 67.00 84.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 158 Barricades - A Frame 2.00 1.000 2.00 3.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 159 Barricades - Cone 1.00 1.000 1.00 1.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 160 Barricades - Crowd Control 10.00 1.000 10.00 13.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 161 Barricades - Directional Signs 1.00 1.000 1.00 1.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 162 Barricades - No Parking Signs 1.00 1.000 1.00 1.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 163 Barricades - Delivery Fees 51.00 1.000 51.00 64.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 164 Jumper Permit 41.00 1.000 41.00 51.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 165 Parade Floats Permit 75.00 1.000 75.00 94.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 166 Sound Permit 27.00 1.000 27.00 34.00 N/A N/A 1-May-2022 150.70 1-Jul-2023 160.30 1.064 167 Trash Can, Per Day 10.00 1.000 10.00 13.00 N/A N/A
RECREATION - TOOL LIBRARIES
Richmond Tool Library
NA NA NA NA NA Fine for Tier 1 (valued under $25) overdue tools, weekly per item New New 1.00 NA NA NA NA NA Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item New New 2.00 NA NA NA NA NA Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item New New 5.00 NA NA NA NA NA Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item New New 8.00 NA NA NA NA NA Fine for Tier 5 (valued over $400) overdue tools, weekly per item New New 15.00 NA NA NA NA NA Replacement charge per item lost, damaged, and unreturned New New Cost NA NA NA NA NA Fine for items returned in poor, dirty, condition New New 5.00 Mobile Tool Library
NA NA NA NA NA Fine for Tier 1 (valued under $25) overdue tools, weekly per item New New 1.00 NA NA NA NA NA Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item New New 2.00 NA NA NA NA NA Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item New New 5.00 NA NA NA NA NA Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item New New 8.00 NA NA NA NA NA Fine for Tier 5 (valued over $400) overdue tools, weekly per item New New 15.00 NA NA NA NA NA Replacement charge per item lost, damaged, and unreturned New New Cost NA NA NA NA NA Fine for items returned in poor, dirty, condition New New 5.00 CS - Recreation June 16, 2026 2738 Page 33 of 81
COMMUNITY SERVICES - EMPLOYMENT & TRAINING FEES
CURRENT FEE Factor PROPOSED FEE
EMPLOYMENT & TRAINING
Not applicable N/A Not applicable N/A N/A 1700 EZ Hiring Tax Credit Voucher--Per voucher/verification ($15 goes to the State) 90.00 N/A 90.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 1700 EZ Hiring Tax Credit Voucher Expediting Fee 29.00 1.041 30.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 1700 EZ Hiring Tax Credit Voucher Look-Up Fee 35.00 1.041 36.00
VOUCHER PROGRAM
City of Richmond
MASTER FEE SCHEDULE
Description ECI
Factor
Index Effective
date for
proposed
increase
Last increase
implemented
ECI Index for
last increase
ECI Index for
proposed
increase
CS - Employment & Training June 16, 2026 2739 Page 34 of 81
COMMUNITY SERVICES - LIBRARY FEES
CURRENT FEE Factor PROPOSED FEE
LIBRARY
Library Fees(for Library Impact Fee, see Building Regulatns, Impact Fees) Not available N/A Not available N/A N/A Replacement Charge per item for lost, damaged, and unreturned materials. Cost N/A Cost
1-03-2004 N/A Not available N/A N/A Rental: Library Community Rooms (Madeline F.
Whittlesey Room and Point Richmond Community Room),
Charge per hour--Will add a separate Rental section
12.50 N/A 12.50
Not available N/A Not available N/A N/A Public Printing/Copies Black & White per page 0.10 N/A 0.10 Not available N/A Not available N/A N/A Public Printing/Copies, Color per page 0.40 N/A 0.50 Not available N/A Not available N/A N/A Overdue fine for Link+ materials borrowed from other libraries: Set by Link+ consortium daily per item 1.00 N/A 1.00 Not available N/A Not available N/A N/A Maximum fine for Link+ materials, borrowed from other libraries: Set by Link+ consortium per item
15.00 N/A 15.00
Not available N/A Not available N/A N/A
Lost, damaged, and unreturned Link+ materials, borrowed from other libraries will be billed for replacement per subsection "Fees for Lost and Damaged Materials owned
by other libraries".
Varies N/A Varies
Not available N/A Not available N/A N/A Processing charge per item for lost, damaged, and unreturned books and media. 0.00 N/A 0.00
Fees for Lost and Damaged Materials Owned by Other Libraries.
Description
City of Richmond
MASTER FEE SCHEDULE
The Library is hereby authorized to collect fees for lost, damaged and unreturned Link+ Fees
*Bookmobile materials currently exempt
Note: Deposit and 2 hr. minimum are new requirements.
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
CS - Library June 16, 2026 2740 Page 35 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
FIRE DEPARTMENT
PREVENTION SERVICES DIVISION
GROUP PERMIT TO OPERATE - SPECIAL USE/ACTIVITY/OPERATIONS Operational Permits include normal inspection time during business hours and one reinspection. Additional inspection time, reinspections, and inspections outside of normal
business hours will incur appropriate staffing charge (SST).
Annual Operational Permit per CFC 105.6
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-1 Aerosol Products 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-3 Aviation Facilities 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-5 Cellulose Nitrate Film 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-6 Combustible Dust-Producing Operations up to 5,000 sq. feet 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-6.1 Each additional 5,000 square feet or fraction thereof 67.00 1.041 70.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-7 Combustible Fibers/Material Storage 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-8 Compressed Flammable Gases 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-8.1 Compressed/Liquified Gas Plant ( up to 5,000 sq. feet) 661.00 1.041 688.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-8.2 Each additional 5,000 sq. feet or fraction thereof 135.00 1.041 141.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-9 Covered & Open Mall Buildings 239.00 1.041 249.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-10 Cryogenic Fluids 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-11 Cutting & Welding (fixed facility) 239.00 1.041 249.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-12 Dry Cleaning 375.00 1.041 390.00 Energy Storage Systems NA NA 249.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-14 Explosives or Blasting Agents 782.00 1.041 814.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-15 Fire Hydrants & Valves - Private 307.00 1.041 320.00 Flammable Combustible Liquids. Permit to store, handle
or the use of (includes installation of new tank):
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.1 Class I liquids in excess of 5 gallons – Inside 444.00 1.041 462.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.2 Class I liquids in excess of 10 gallons – Outside 579.00 1.041 603.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.3 Class II or Class III A liquids in excess of 25 gallons - Inside 444.00 1.041 462.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.4 Class II or Class III A liquids in excess of 60 gallons – Outside 579.00 1.041 603.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.5 Flammable/Combustible Liquids – (removal) 444.00 1.041 462.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.6 Flammable/Combustible Liquids - Plants/Warehouse - Up to 5k sq ft 525.00 1.041 547.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.7 Each additional 5,000 sq ft or fraction of 135.00 1.041 141.00 City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
Fire June 16, 2026 2741 Page 36 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.8 Flammable/Combustible Liquids – Out of Service Tank 661.00 1.041 688.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.9 Flammable/Combustible Liquids – Change of Contents 390.00 1.041 406.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.10 Flammable/Combustible Liquids - Manufacture 525.00 1.041 547.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
16.11 Printing Plant or Shop 171.00 1.041 178.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-17 Floor Finishing 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-18 Fruit & Crop Ripening 307.00 1.041 320.00 NA NA NA NA NA OP19-19 Fumigation & Insecticidal Fogging NA NA 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-20 Hazardous Materials Storage/Use 593.00 1.041 617.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.1 Chemical Plant 0-5,000 sq ft 661.00 1.041 688.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.2 Chemical Plant - Each additional 5,000 sq ft or fraction thereof 135.00 1.041 141.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.3 Radioactive Material (any amount) 579.00 1.041 603.00 Chemical Warehouse
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.4 5,000 square feet or less 390.00 1.041 406.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.5 Each additional 5,000 square feet or fraction thereof 67.00 1.041 70.00 Laboratory
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.6 5,000 square feet or less 727.00 1.041 757.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.7 Each additional 5,000 square feet or fraction thereof 135.00 1.041 141.00 Bulk Plant/Terminal
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.8 10 acres or less 3,567.00 1.041 3,714.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.9 Each additional 10 acres or fraction thereof 3,160.00 1.041 3,290.00 Bulk Transfer
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.10 10 acres or less 3,567.00 1.041 3,714.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.11 Each additional 10 acres or fraction thereof 3,160.00 1.041 3,290.00 Process Transfer
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.12 10 acres or less 3,567.00 1.041 3,714.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
20.13 Each additional 10 acres or fraction thereof 3,160.00 1.041 3,290.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-21 HPM (Hazardous Production Material) Facilities - Semiconductor manufacturer 1,543.00 1.041 1,607.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-22 High Pile Storage 1-10,000 sq. feet 525.00 1.041 547.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
22.1 High Pile Storage 10,001-20,000 sq. ft. 661.00 1.041 688.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
22.2 High Pile Storage 20,001-50,000 sq. ft. 727.00 1.041 757.00 Fire June 16, 2026 2742 Page 37 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
22.3 High Pile Storage >50,000 sq. ft. 797.00 1.041 830.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
22.4 High Pile Storage per 10k sq feet above 50k 67.00 1.041 70.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-23 Hot Work Operations 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-24 Industrial Ovens/ Commercial Incinerator 444.00 1.041 462.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-25 Lumber Yards & Woodworking Plants 579.00 1.041 603.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-26 Liquid or Gas Fueled Vehicles or Equipment in Assembly Buildings 307.00 1.041 320.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-27 Liquid Propane (LP) Gas per tank - cylinder exchange only 105.00 1.041 109.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
27.1 LPG (less than 2K gallons) 171.00 1.041 178.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
27.2 LPG (more than 2K gallons) 239.00 1.041 249.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
27.3 LPG Plant/Facility 0-5,000 sq ft 661.00 1.041 688.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
27.4 LPG Plant/Facility each additional 5k sq ft or fraction thereof 135.00 1.041 141.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-28 Magnesium 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-29 Miscellaneous Combustible Storage 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-30 Mobile Food Prep Vehicles N/C NA N/C 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-31 Motor Fuel Dispensing Facilities 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
31.1 Tank Vehicle Dispensing 171.00 1.041 178.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-32 Open Burning 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-33 Open Flames & Torches 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-34 Open Flames & Candles 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
34.1 Open Flames/Candle Single Use 135.00 1.041 141.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-35 Organic Coatings 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-37 Places of Assembly 50-99 persons 105.00 1.041 109.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
37.1 Places of Assembly 100-299 persons 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
37.2 Places of Assembly 300+ persons 239.00 1.041 249.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-38 Cannabis Cultivation/Plant Extraction 1,672.00 1.041 1,741.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-39 Private Fire Hydrants 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-41 Pyroxylin Plastics 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-42 Refrigeration Operation Equipment 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
43.1 Repair Garage 307.00 1.041 320.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-44 Rooftop Heliports 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-45 Spraying or Dipping 5,000 sq ft or less 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
45.1 Spraying or Dipping, each additional 5,000 sq ft or fraction thereof 67.00 1.041 70.00
Fire June 16, 2026 2743 Page 38 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-46 Storage of Scrap Tires & Tire Byproducts <5,000 sq. ft. 510.00 (0.512) 249.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Storage of Scrap Tires & Tire Byproducts >5,000 sq. ft. 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-48 Tire-Rebuilding Plants 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-49 Waste Handling 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-50 Wood Products 510.00 1.041 531.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Additional Permits 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-51
1. Production Facilities – Change use or occupancy or
allow the attendance of a live audience, or for wrap
parties.
647.00 1.041 674.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
51.1 2. Pyrotechnics & Special Effects – Use of pyrotechnics special effects for the use of motion picture, television and commercial production.
647.00 1.041 674.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
51.2 3. Live Audiences – Install seating for live audiences (production studios & sound stages) 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-54 Asbestos Removal 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-55 Battery System Storage 192.00 1.041 200.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Change of Occupancy/Site Inspection or Miscellaneous Inspection
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-60
A permit is required for a requested inspection for the change of occupancy including, but not limited to:
Inspections conducted when required by Building Official, Planning, or other Governmental agency and where not
elsewhere listed.
406.00 1.041 423.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-61 Five Year Sprinkler Test 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-64 Emergency Responder Radio System 270.00 1.041 281.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Single Use/Temporary Operational Permit per CFC 105.6 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
Rates include plan review and site inspection conducted during business hours only. Inspections outside of
business hours subject to minimum rates specified under OP-100.
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Single Use Permit Issuance 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-2 Amusement Buildings (each occurrence) 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-4 Carnivals and Fairs (each occurrence) 438.00 1.041 456.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-4.1 Float, Parade 180.00 1.041 187.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-53 Christmas Tree Lot, including tents 441.00 1.041 459.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
11.1 Cutting & Welding Single Use (Valid for 180 days) 259.00 1.041 270.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-13 Exhibits & Trade Shows 370.00 1.041 385.00 Fire June 16, 2026 2744 Page 39 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
23.1 Hot Work Operations - Single Use 370.00 1.041 385.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-40 Pyrotechnic Special Effects Material, Inside. 640.00 1.041 666.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-36 Outdoor Assembly Event 510.00 1.041 531.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-51 Temporary Assembly, Indoor 582.00 1.041 606.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Firework Aerial Display 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Pyrotechnics, outside (Firework Aerial Display) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-56 Pyrotechnics, outside (Firework Aerial Display) 1,651.00 1.041 1,719.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
56.1 Standby personnel minimum (3 hours) 1,017.00 1.041 1,059.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
56.2 Additional hours, per person/per hour 339.00 1.041 353.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PTO -
56.3 Set Piece Display 569.00 1.041 592.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Temporary Membrane Structures & Tents 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-47 Temporary Membrane Structures & Tents, each (399 - 699 sq. ft.) 235.00 1.041 245.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
47.1 Temporary Membrane Structures & Tents, each (700-
4999 sq. ft.) 370.00 1.041 385.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
47.2 Temporary Membrane Structures & Tents, each (5,000 + sq. ft.) 510.00 1.041 531.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
47.3 Temporary Membrane/Tent Extended Use (180 days) 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-57 Model Rocket Event 162.00 1.041 169.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
57.1 Model Rocket Sales 162.00 1.041 169.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-
57.2 Model Rockets Youth Scouts/Troops 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP19-58 Temporary Water Supply 339.00 1.041 353.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP-100.1 Additional inspection/standby time during business hours, per person, per half hour 135.00 1.041 141.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP-100.2 After hours inspection time/standby minimum (3 hours) 1,017.00 1.041 1,059.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 OP-100.3 Additional inspection/standby time after business hours, per person, per half hour 202.00 1.041 210.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP HIGH RISE 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 H-1 High Rise Inspection (State certification inspection) - Post 1974 677.00 1.041 705.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 H-1.1 Plus $ .05 per square foot - 1.041 - 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 H-2 Mid Rise- Life safety systems test 682.00 1.041 710.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 H-2.1 Plus ($ .05 per square foot) - 1.041 - 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 H-3 Low Rise- Life safety systems test (includes 4 hours) 1,225.00 1.041 1,276.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP REFINERY/BULK PLANT or TERMINAL/BULK TRANSFER/PROCESS TRANSFER Fire June 16, 2026 2745 Page 40 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 REF/BULK
Bulk Plant/Terminal Rate (Section III plan review,
Section IV Permit to Operate 21.10 & 21.11) Permit to
Operate a Bulk Plant or Terminal facility where flammable or combustible liquids are received by tank vessel,
pipelines, tank car or tank vehicle and are stored or
blended in bulk for the purpose of distributing such liquids by tank vessel, pipeline, tank car, tank vehicle, portable tank or container.
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
Bulk Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.12 & 21.13) Permit to Operate a
Bulk Transfer facility where loading or unloading of
flammable or combustible liquids from or between tank
vehicles, tank cards or storage tanks.
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
Process Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.14 & 21.15) Permit to Operate
a Process Transfer facility where the transfer of
flammable or combustible liquids between tank vehicles
or tank cars and process operations. Process operations may include containers, tanks, piping and equipment.
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 SECTION II –SPECIAL SERVICES 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP SPECIAL SERVICE TASK 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST - 1 Reinspections (third and subsequent) or callback 356.00 1.041 371.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST –
1.1 Additional inspection time during normal business hours - per half hour. 135.00 1.041 141.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST –
1.2 Additional inspection time after normal business hours - per half hour. 202.00 1.041 210.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST –
1.3 Inpections conducted after business hours, on weekends, or holidays (3 hour minimum) 1,017.00 1.041 1,059.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 2 Consultation: 1/2 hour minimum 144.00 1.041 150.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 3 Copying: Per Page 0.20 NA 0.20 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 False Alarms: Initial notice to correct any malfunctions with alarm system No Charge NA No Charge
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 4 For 1st (within 180 days) 342.00 1.041 356.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST –
4.1 2nd – (within 180 days) 659.00 1.041 686.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST –
4.2 3rd – and/or each occurrence thereafter (within 365 days) 1,303.00 1.041 1,357.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST-5 Weld Inspection 339.00 1.041 353.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fire Protection System Signaling Service 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 6 Registration and 1st Year service fee 299.00 1.041 311.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST –
6.1 Annual Service Fee 54.00 1.041 56.00
Fire June 16, 2026 2746 Page 41 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 7 Halon Concentration Test 610.00 1.041 635.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 8 Knox Box Service 60.00 1.041 62.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 9 Standby: Single person during business hours, per hour 297.00 1.041 309.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST-9.1 Standby: Single person, after business hours, per hour 366.00 1.041 381.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST-9.2 Standby: Fire Engine/Unit per hour 892.00 1.041 929.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 10 Training/Instructional Services Base Fee (up to 2 hours) 618.00 1.041 644.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST -
10.1 Additional training/instructional time, per hour 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 11 File Research and Review 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST – 12 Business License Inspection 180.00 1.041 187.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST - 13 Failure to obtain operational permit DOUBLE FEES NA DOUBLE FEES 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST - 14 Extend plan review/construction permit 180 days 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST - 15 Building Owner (Parent) Fire Permit 285.00 1.041 297.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SST - 16 AB-38 Inspections 285.00 1.041 297.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 SECTION III – PLAN REVIEW 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP PRELIMINARY PLAN REVIEW – CONSULTATIONS/MEETING 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-1 In Office Design/Consultation per half hour 144.00 1.041 150.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-1.2 Out of Office Design/Consultation per hour (min. 2 hours) 578.00 1.041 602.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-1.3 Review of fire & life safety systems 628.00 1.041 654.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-1.4 Gates and barricades on fire roads 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Major Subdivision Plan Review (5 or More Lots/Parcels) (See PR 11.1) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 2 Review of subdivision for access, hydrant placement. 972.00 1.041 1,012.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Minor Subdivision Plan Review (1 to 4 Lots/Parcels) (See PR 11.1) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 2.2 Review of subdivision for access, hydrant placement. 539.00 1.041 561.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Single Family Home Review – access & water supply 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 2.3 Single Family Home Review – access & water supply (new construction) 199.00 1.041 207.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
2.3.1 Single Family Home Review – access & water supply (TI/modifications) 199.00 1.041 207.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP BUILDING CONSTRUCTION – NEW BUILDINGS & TENANT IMPROVEMENTS 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 New Construction or Building Additions Plan Review (See PR 11.1) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 3 Minimum plan review base fee. 683.00 1.041 711.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 3.1 Plus $.08 per square foot in excess of 2,000 sq. ft. - 1.041 - 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Tenant Improvement Plan Review (for building additions see PR 3.1) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 3.2 Minimum plan review base fee. 683.00 1.041 711.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
3.2.1 Plus $.08 per square foot in excess of 2,000 sq. ft. - 1.041 - 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-3.3 Industrial Ovens (CFC 105.7.15) 683.00 1.041 711.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-3.4 Motor Vehicle Repair Room and Booths (CFC 105.7.17) 683.00 1.041 711.00 Fire June 16, 2026 2747 Page 42 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-3.5 Solar Photovoltaic Power Systems (CFC 105.7.21) 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 SECTION III – PLAN REVIEW 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP WATER SUPPLY – FIRE SERVICE MAINS – FIRE HYDRANTS 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fire Service – Emergency Repair 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 4 Review of underground piping, placement, and size. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Repair Private Fire Service Hydrants and/or Piping to Firewater Lines
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 4.2 Minimum plan review base fee of system. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Flush - Private Fire Service System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 4.3 Minimum inspection base fee. 394.00 1.041 410.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Hydrostatic Test - Private Fire Service System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 4.4 Minimum inspection/test base fee. 734.00 1.041 764.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Water Flow Information Field Test 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 4.5 Minimum field test base fee. 878.00 1.041 914.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
4.5.1 Additional or multiple flow tests per ½ hour. 135.00 1.041 141.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 SECTION III – PLAN REVIEW 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP FIRE PROTECTION SYSTEMS 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Tenant Improvement Fire Sprinklers (without calculations) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.1.2 Additional inspections per hour (i.e. weld-o-let, hydro, visual, etc…) 339.00 1.041 353.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Tenant Improvement Fire Sprinklers (with calculations) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.2 Minimum plan review base fee. 894.00 1.041 931.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.2.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) 339.00 1.041 353.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 New Commercial Fire Sprinkler System (13, 13R, & 15 systems) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.3 Minimum plan review base fee per riser. 1,378.00 1.041 1,435.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.3.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) 339.00 1.041 353.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Residential Fire Sprinkler System (single family home) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.4 Minimum plan review base fee. 1,021.00 1.041 1,063.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Residential Fire Sprinkler System (multiple homes) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.5 Minimum plan review base fee per model. 1,225.00 1.041 1,276.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.5.1 Each additional lot (flush, hydrostatic test and final) 406.00 1.041 423.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.5.2 Each Additional inspection per hour (i.e. models, individual homes) 339.00 1.041 353.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Standpipe System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.6 Minimum plan review base fee. 1,021.00 1.041 1,063.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.6.1 Each additional inspection per hour (i.e. hydro, flush, flow test, etc…) 270.00 1.041 281.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Spray Booth (includes booth and fire extinguishing system) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.7 Minimum plan review base fee. 1,039.00 1.041 1,082.00 Fire June 16, 2026 2748 Page 43 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Pre-Action Fire Suppression System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.8 Minimum plan review base fee. 1,021.00 1.041 1,063.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fixed Fire Suppression System – (wet/dry chem., water mist, etc…) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 5.9 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.9.1 Each additional separate system at same location. 270.00 1.041 281.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Clean Agent Fire Suppression System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.10 Minimum plan review base fee. 1,292.00 1.041 1,345.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fire Pump Installation 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.11 Minimum plan review base fee. 2,123.00 1.041 2,211.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Commercial Cooking (Hood and Duct) Fire Suppression System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.12 Minimum plan review base fee. 749.00 1.041 780.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–5.12.
1 Each additional system. 270.00 1.041 281.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Smoke & Heat Vents 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.13 Minimum plan review base fee. 749.00 1.041 780.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Smoke Management/Control System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.14 Minimum plan review base fee. 2,209.00 1.041 2,300.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Explosion Control (includes: vents, dust collection, etc…) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
5.15 Minimum plan review base fee. 1,132.00 0.000 1,132.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP FIRE ALARM SYSTEM 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fire Alarm System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 6 Minimum plan review base fee. 1,039.00 1.041 1,082.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 6.1 Plus $ 11.00 per initiating device 7.00 1.041 7.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
6.1.2 Pre-wire inspections per hour. 339.00 1.041 353.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc…)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 6.2 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fire Alarm Panel Replacement Only 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 6.3 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 High-Rise Fire Alarm (new and/or system upgrade) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR - 6.4 Minimum plan review base fee. 2,567.00 1.041 2,673.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR -
6.4.1 Plus $ 11.00 per initiating device 7.00 1.041 7.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
6.4.3 Pre-wire inspections per hour. 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-6.5 Emergency Responder Radio Coverage System 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
GROUP
FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKSPIPING & DISPENSING) 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Remove (Repair, Modify, Extend Piping) Underground Tank
Fire June 16, 2026 2749 Page 44 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 7.1 Install/Repair/Modify/Extend Piping/Remove Underground Tank. 954.00 1.041 993.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install (Repair, Modify, Extend Piping) Aboveground Tank 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 7.2 Install/Repair/Modify/Extend Piping/Remove Aboveground Tank. 683.00 1.041 711.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
7.2.1 Each additional tank. 270.00 1.041 281.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Abandon Underground Tank in Place 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 7.3 Minimum plan review base fee. 878.00 1.041 914.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
Environmental Upgrade (vapor recovery and processing
systems, spill control, secondary containment and
environmental agency requirements)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 7.4 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Apply Interior Coating to Flammable Liquid Tanks 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 7.5 Minimum plan review base fee. 1,021.00 1.041 1,063.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
GROUP
COMPRESED GAS SYSTEMS: LPG
/CNG/MEDICAL/CRYOGENICS
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Container Exchange Programs; LPG Tank Installation Without Dispensing 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 8 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair LPG – CNG – Hydrogen (Tank Install and/or Dispensing)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 8.2 Minimum plan review base fee. 1,165.00 1.041 1,213.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair Medical or Compressed Gas Systems
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 8.3 Minimum plan review base fee. 1,302.00 1.041 1,356.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair Cryogenics Fixed Installation 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 8.4 Minimum plan review base fee. 1,302.00 1.041 1,356.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair Compressed Gas Storage 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 8.5 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-8.6 Install, Modify Cannabis/Plant Extraction System (CFC 105.7.18) 1,175.00 1.041 1,224.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-8.6.1 Plus $0.08 per square foot in excess of 2,000 sq. ft. - 1.041 - 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP SPECIAL HAZARDS – HAZARDOUS 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Battery Systems 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 9 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Dust Collection Systems 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 9.2 Minimum plan review base fee. 749.00 1.041 780.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Explosives Storage 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 9.3 Minimum plan review base fee. 1,446.00 1.041 1,506.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Hazardous Materials Compliance Review 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 9.4 Minimum review of MSDS, HMMP and/or HMIS submittals. 288.00 1.041 300.00
Fire June 16, 2026 2750 Page 45 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Hazardous Materials – Storage /Dispensing – Open/Closed Systems
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 9.5 Minimum plan review base fee. 1,446.00 1.041 1,506.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
9.5.1 Each additional system. 560.00 1.041 583.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-9.5.3 Dipping (CFC 105.7.23) 749.00 1.041 780.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair Mechanical Refrigeration Systems 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 9.6 Minimum plan review base fee. 1,157.00 1.041 1,205.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR-9.7 Fuel Cell Power Systems (CFC 105.7.10) 1,021.00 1.041 1,063.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP HIGH PILE RACK STORAGE SYSTEMS 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 High-Pile or Rack Storage 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 10 Minimum plan review base fee. 962.00 1.041 1,002.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Temporary Access Roads & Water Supply 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install a Temporary Access Road – Residential and Commercial
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 11 Install a Temporary Access Road - 1-2 Homes 334.00 1.041 348.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR–11.1 Install a Temporary Access Road 3+ Homes or Commerical 749.00 1.041 780.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install a Temporary Water Supply System 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 12 Minimum plan review base fee. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Miscellaneous Submittals - Alternative Means and Methods
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Miscellaneous Submittals or Plans Review 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 13 Minimum plan review base fees up to two hours. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Alternative Means and Methods Requests or Code Interpretation Review 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
13.2 Minimum review base fee. 578.00 1.041 602.00
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP EXPEDITE PLAN REVIEW REQUEST & ADDITIONAL CHARGES/INSPECTION TIME 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 14 Expedited Plans Surcharge (after business hours) 866.00 1.041 902.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Demolition Permit pursuant to Chapter 33, CFC 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 15 Demolition Permit pursuant to Chapter 33, CFC 402.00 1.041 419.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP BULK/TERMINAL/BULK TRANSER/PROCESS TRANSFER MAINTENANCE REVIEW 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
Fees will be based on construction permit required for
routine maintenance/repair work which conducted within
these facilities.
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair, Replace Fireproofing 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 16 Minimum plan review base fees up to two hours. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 17 Minimum plan review base fees up to two hours. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials
Fire June 16, 2026 2751 Page 46 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 18 Minimum plan review base fees up to two hours. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Install, Modify, Repair Pump Installed In Hazardous Material Process System
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 19 Minimum plan review base fees up to two hours. 683.00 1.041 711.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Additional Plan Review Fees 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 20 Revisions and resubmittals, per hour 288.00 1.041 300.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 21 Additional plan review time, per half hour 144.00 1.041 150.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
21.1 Additional plan review time, expedited, per hour 288.00 1.041 300.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 22 Additional inspections during business hours (min 1 hour) 339.00 1.041 353.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
22.1 Additional inspection time during business hours, per half hour 135.00 1.041 141.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
22.2 After hours inspection, 3 hour minimum 1,017.00 1.041 1,059.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR –
22.3 Additional inspection time, after hours, per half hour 202.00 1.041 210.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PR – 23 Working without approved plans DOUBLE FEE NA DOUBLE FEE 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 SECTION IV – NOTES 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP NOTES
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000
Permits are non-transferrable and fees are nonrefundable. Failure to pay invoice fees within 30 days shall result in a 20 percent late payment charge. In the case of multiple annual permits, permits may be issued
for shorter periods and prorated on the basis of a 1/12th charge for each month and portion thereof.
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 SECTION V – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 GROUP FIRE INCIDENT RESPONSE 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 FIR – 1 Per unit response, per hour (includes captain, engineer and firefighter) 714.00 1.041 743.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 FIR – 2 Damaged or consumable equipment replaced at cost. Actual Cost NA Actual Cost 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 FIR – 3
RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per
person, at various response levels and for itemized
products and equipment used.
Actual Cost NA Actual Cost
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Fire & Life Safety Inspections (does not include applicable operational permits)
1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group Assembly/Business/Mercantile/Office Suite 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 BM-1 B/M 0-5,000 sq. feet 177.00 1.041 184.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 BM-2 B/M 5,001 – 10,000 sq. feet 395.00 1.041 411.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 BM-3 B/M 10,001 – 20,000 sq. feet 530.00 1.041 552.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 BM-4 B/M 20,001 – 40,000 sq. feet 667.00 1.041 695.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 BM-5 B/M 40,001+ sq. feet 869.00 1.041 905.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group Other Occupancy (F/H/L/S) Fire June 16, 2026 2752 Page 47 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 O-1 O 0-5,000 sq. feet 327.00 1.041 341.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 O-2 O 5,001-10,000 sq. feet 463.00 1.041 482.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 O-3 O 10,001-20,000 sq. feet 667.00 1.041 695.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 O-4 O 20,001+ sq. feet NEW NEW 905.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group Schools 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E-1 Occupant load 1- 50 463.00 1.041 482.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E-2 Occupant load 51-149 598.00 1.041 623.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E-3 Occupant load 150-499 735.00 1.041 765.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 E-4 Occupant load 500+ 869.00 1.041 905.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group State Licensed Care Facilities 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SL-1 Residential Large Family Day Care (9-14 persons) 395.00 1.041 411.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SL-2 Commercial Day Care E/I4 (6-49 persons) 598.00 1.041 623.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SL-3 Commercial Day Care E/I4 (50+ persons) 735.00 1.041 765.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SL-4 Pre-inspection/850 Form 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SL-5 Residential Assisted Living Facility (24 hr) 463.00 1.041 482.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SL-6 Other Licensed Facilities 463.00 1.041 482.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group Institutional 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 I-1 Hospital/Surgical Center <50k sq. feet 869.00 1.041 905.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 I-2 Hospital/Surgical Center 50,001+ sq. feet 1,955.00 1.041 2,036.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 I-3 Nursing/Nonambulatory Facilities 735.00 1.041 765.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 I-4 Jails/Detention Facilities 1,820.00 1.041 1,895.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 I-5 Police Holding Cells or DOJ Review 288.00 1.041 300.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group Residential R1/R2 Occupancies 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-1 Residential 1-5 units 170.00 1.041 177.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-2 Residential 6-15 units 276.00 1.041 287.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-3 Residential 16-99 units 400.00 1.041 417.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-4 Residential 100-249 units 809.00 1.041 842.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-5 Residential 250-499 units 1,284.00 1.041 1,337.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-6 Residential 500+ units 3,671.00 1.041 3,823.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-7 Residential - Transient (hotel, motel, shelter) 463.00 1.041 482.00 1-Jul-2023 160.30 1-Jul-2023 160.30 1.000 Group FIRE INCIDENT RESPONSE CHIEF LEVEL
RESPONSE
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR – 1 Chief of Department, per hour 361.00 1.041 376.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR – 2 Deputy Fire Chief, per hour 320.00 1.041 333.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR – 3 Battalion Chief, per hour 278.00 1.041 289.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR – 4 Fire Marshal, per hour 288.00 1.041 300.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR – 5 Deputy Fire Marshal, per hour 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR-6 Fire Investigator, during business hours, per hour 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR-6.1 Fire Investigator, outside business hours, per hour 406.00 1.041 423.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR-7 Emergency Services Manager, per hour 158.00 1.041 165.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR-8 Captain, per hour 259.00 1.041 270.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR-9 Engineer, per hour 230.00 1.041 239.00 Fire June 16, 2026 2753 Page 48 of 81
FIRE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CLR-10 Firefighter, per hour 225.00 1.041 234.00 Fire June 16, 2026 2754 Page 49 of 81
INTERNAL SERVICES - FINANCE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
na na na na na Charges for Bad Checks/Returned Check Processing 35.00 N/A 35.00 na na na na na
Mitigation Administrative Fee -- 3% of the total project mitigation fees (collected by Building Regulations;
administered by Finance) 0.02 N/A 0.02
na na na na na Form W-2 Replacement Fee 10.00 N/A 10.00 na na na na na New Business Registration 35.00 N/A 35.00 na na na na na
Non-refundable external service fee of 2.95% charged for each credit/debit card transaction, with a minimum fee of $2 per transaction. 2.95% N/A 2.95%
City of Richmond
MASTER FEE SCHEDULE
FINANCE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
IS - Finance June 16, 2026 2755 Page 50 of 81
INTERNAL SERVICES - INFORMATION TECHNOLOGY DEPARTMENT - CABLE FEES CURRENT FEE Factor PROPOSED FEE
not applicable na not applicable na na Telecommunications Registration & Review Fee 90.00 N/A 90.00 not applicable na not applicable na na
Videodisks -- charged at cost for time and materials.
Average approximate cost begins at $25 for one tape,
$40 for two tapes (same footage) (materials and man
hours) Actual Cost N/A Actual Cost
City of Richmond
MASTER FEE SCHEDULE
CABLE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
IS - IT - Cable June 16, 2026 2756 Page 51 of 81
INTERNAL SERVICES - INFORMATION TECHNOLOGY DEPARTMENT - GEOGRAPHIC INFORMATION SERVICES FEES CURRENT FEE Factor PROPOSED FEE
Geographic Information Systems (GIS)
1 General Services
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 2
Labor--Chargeable on any service listed under GIS when
the project takes more than one hour (custom map), any
customization is required (predefined map, mapping
series), or any other GIS-related customer service is
requested. The rate is hourly-based ($72) and is
chargeable by quarter-hour increments ($18).
150.00 1.041 156.00
3 Custom Map
4 Plotter
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 5 17" x 22" (ANSI-C) 94.00 1.041 98.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 6 - Additional prints (per print) (max. 5) 40.00 1.041 42.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 7 - With orthophotos 96.00 1.041 100.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 8 - With orthophotos, additional prints (per print) (max. 5) 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 9 22" x 34" (ANSI-D) 122.00 1.041 127.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 10 - Additional prints (per print) (max. 5) 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 11 - With orthophotos 124.00 1.041 129.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 12 - With orthophotos, additional prints (per print) (max. 5) 44.00 1.041 46.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 13 34" x 44" (ANSI-E) 123.00 1.041 128.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 14 - Additional prints (per print) (max. 5) 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 15 - With orthophotos 127.00 1.041 132.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 16 - With orthophotos, additional prints (per print) (max. 5) 45.00 1.041 47.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 17 All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 18.00 1.041 19.00
1-May-2022 150.70 1-Jul-2023 160.30 1.064 18 Printer
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 19 8-1/2" x 11" color 75.00 1.041 78.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 20 - Additional prints (per print) (max. 5) 3.00 1.041 3.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 21 - With orthophotos 80.00 1.041 83.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 22 - With orthophotos, additional prints (per print) (max. 5) 4.00 1.041 4.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 23 11" x 17" 75.00 1.041 78.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 24 - Additional prints (per print) (max. 5) 4.00 1.041 4.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 25 - With orthophotos 80.00 1.041 83.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 26 - With orthophotos, additional prints (per print) (max. 5) 6.00 1.041 6.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 27 All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 18.00 1.041 19.00
1-May-2022 150.70 1-Jul-2023 160.30 1.064 28 Electronic Map (Note: The default format for electronic maps is pdf)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 29 Electronic--all scales, stand-alone (ie., w/out hardcopy map) 72.00 1.041 75.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 30 Electronic--additional copies (per copy or delivery) 18.00 1.041 19.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 31 PREDEFINED MAP City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
IS - IT - GIS June 16, 2026 2757 Page 52 of 81
INTERNAL SERVICES - INFORMATION TECHNOLOGY DEPARTMENT - GEOGRAPHIC INFORMATION SERVICES FEES CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
1-May-2022 150.70 1-Jul-2023 160.30 1.064 32 Plotter
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 33 17" x 22" (ANSI-C) 40.00 1.041 42.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 34 - Additional prints (max. 5) 40.00 1.041 42.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 35 - With orthophotos 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 36 - With orthophotos, additional prints (max. 5) 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 37 22" x 34" (ANSI-D) 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 38 - Additional prints (max. 5) 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 39 - With orthophotos 44.00 1.041 46.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 40 - With orthophotos, additional prints (max. 5) 44.00 1.041 46.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 41 34" x 44" (ANSI-E) 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 42 - Additional prints (max. 5) 42.00 1.041 44.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 43 - With orthophotos 45.00 1.041 47.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 44 - With orthophotos, additional prints (max. 5) 45.00 1.041 47.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 45 All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) 18.00 1.041 19.00
1-May-2022 150.70 1-Jul-2023 160.30 1.064 46 Print
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 47 8-1/2" x 11" color 39.00 1.041 41.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 48 - Additional prints (max. 5) 3.00 1.041 3.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 49 - With orthophotos 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 50 - With orthophotos, additional prints (max. 5) 4.00 1.041 4.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 51 11" x 17" 39.00 1.041 41.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 52 - Additional prints (max. 5) 4.00 1.041 4.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 53 - With orthophotos 41.00 1.041 43.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 54 - With orthophotos, additional prints (max. 5) 6.00 1.041 6.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 55 Electronic Map (Note: The default format for electronic maps is pdf)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 56 Electronic--all scales, stand-alone (ie., w/out hardcopy map) 41.00 1.041 43.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 57 Electronic--additional copies (per copy or delivery) 18.00 1.041 19.00 IS - IT - GIS June 16, 2026 2758 Page 53 of 81
POLICE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
Police
NA NA NA NA NA 1 Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 2
Traffic Accident/Police Report (federal, state, county, municipalities, districts, and other political subdivisions exempt), per report
10.00 1.041 10.00
NA NA NA NA NA 3 Booking Fees (passed through to County) Actual Cost NA Actual Cost NA NA NA NA NA 4 Traffic Violations--In accordance with California Penal Code Section 19
Refer to Vehicle
Code - Refer to Vehicle Code
NA NA NA NA NA 5 Non-resident Ticket Sign-off 10.00 NA 10.00 6 Fingerprinting (also see "Concealed Weapons
Permit")
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 7 Resident, first card 49.00 1.041 51.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 8 Resident, additional card 19.00 1.041 20.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 9 Non-resident, first card 52.00 1.041 54.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 10 Non-resident, additional card 44.00 1.041 46.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 11 Livescan fingerprinting service, resident 52.00 1.041 54.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 12 Livescan fingerprinting service, non-resident 52.00 1.041 54.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 13 Prisoner Medical Transport (cost) Cost NA Cost 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 14 Police Clearances/Records Check 41.00 1.041 43.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 15 Taxi Permits (Scripts Only) 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 16 New driver 226.00 1.041 235.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 17 Annual renewal 150.00 1.041 156.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 15 Special Event Permit Fees 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 18 Special Event/Parade Permit 78.00 1.041 81.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 19 Sound Permit 24.00 1.041 25.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 15 Production Cost Fees 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 20 CAD Printouts 10.00 1.041 10.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 21 Communications Dispatch Recordings, each 111.00 1.041 116.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 22 Copy of Interview Audio/Video Recordings each 21.00 1.041 22.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 23 Vehicle Tow Fees 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 24 Vehicle removal (non rental) from highway or public land for 5 or more unpaid parking violations (CVC 22651(i)(1) 140.00 1.041 146.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 25 Vehicle removal from highway, public or private land 249.00 1.041 259.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 26 Vehicle found in private or public land with registration expired in excess of 6 months 249.00 1.041 259.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 27 Vehicle parked or left standing on highway for more than 72 hours 249.00 1.041 259.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 28 Vehicle parked on street or alley for more than 72 hours 249.00 1.041 259.00 City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
Police June 16, 2026 2759 Page 54 of 81
POLICE DEPARTMENT FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 29 First vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values 311.00 1.041 324.00 N/A N/A N/A N/A N/A 30 Each additional vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values - N/A - 1-May-2022 150.70 1-Jul-2023 160.30 1.064 34 Peddlers & Solicitors Police Permit N/A N/A N/A N/A N/A 35 Initial permit (plus Business License permit; paid at Business License Unit) 15.00 N/A 15.00
N/A N/A N/A N/A N/A 36 Permit renewal (plus Business License permit; paid at Business License Unit) 7.00 N/A 7.00
N/A N/A N/A N/A N/A 37 Community Noise Ordinance Violation--Cost for administrative enforcement and noise testing Cost N/A Cost N/A N/A N/A N/A N/A 38
Mechanical or Electronic Amusement Device Permit, per
device/per calendar year (prorated for calendar quarters; paid at Business License Unit)
84.00 N/A 84.00
1-May-2022 150.70 1-Jul-2023 160.30 1.064 39 Concealed Weapons Permit $0 - $0 - - 40 Original permit application filing fee 100.00 N/A 500.00 N/A N/A N/A N/A N/A 41 Fingerprint fee 71.00 N/A 71.00
N/A N/A N/A N/A N/A 42 Permit renewal fee 25.00 N/A 25.00 N/A N/A N/A N/A N/A 43 Permit amendment fee 10.00 N/A 10.00 44 ALCOHOL AND TOBACCO RETAIL INSPECTIONS
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 45 Cost per business of compliance inspection See CD - Code Enforcement N/A See CD - Code Enforcement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 46 Cost per business of decoy operation See CD - Code Enforcement N/A See CD - Code Enforcement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 47 Total cost per business for compliance inspection and decoy operation
See CD - Code
Enforcement N/A See CD - Code Enforcement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 48 Compliance inspection of alcohol and/or tobacco retailer See CD - Code Enforcement N/A See CD - Code Enforcement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 49 Combined inspection of alcohol and tobacco retailer See CD - Code Enforcement N/A See CD - Code Enforcement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 50 Re-inspection of alcohol and/or tobacco retailer See CD - Code Enforcement N/A See CD - Code Enforcement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 51 Underage sales investigation of alcohol and/or tobacco retailer
See CD - Code
Enforcement N/A See CD - Code Enforcement
1-May-2022 150.70 1-Jul-2023 160.30 1.064 POLICE - CANNABIS ORDINANCE N/A N/A N/A N/A N/A Application Completeness Review/Per Application See Cannabis Fees N/A See Cannabis Fees
N/A N/A N/A N/A N/A Complete Application Review/Per Application See Cannabis Fees N/A See Cannabis Fees
N/A N/A N/A N/A N/A Annual Regulation and Inspection/Per Quarter See Cannabis Fees N/A See Cannabis Fees
Police June 16, 2026 2760 Page 55 of 81
PUBLIC WORKS FEES
CURRENT FEE Factor PROPOSED FEE
Infrastructure Maintenance & Operations
SECTION 1
Sidewalk Dining Parklet
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Encroachment Permit Application Review for outdoor
service on public sidewalks, minimum non-refundable 1,034.00 1.041 1,076.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
New Encroachment Permit for outdoor service on public
sidewalks (first year, annual fee) 720.00 1.041 750.00
not applicable na not applicable na na
- plus additional fees for in-ground improvements within the public ROW
(0-100 SF)
500.00 NA 500.00
not applicable na not applicable na na - plus in-ground improvements for square footage thereafter (over 100 SF) $2.00/SF NA $2.00/SF
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Renew Encroachment Permit for outdoor service on
public sidewalks (annual fee) 461.00 1.041 480.00
not applicable na not applicable na na
- plus additional fees for in-ground improvements within the public ROW
(0-100 SF)
500.00 NA 500.00
not applicable na not applicable na na - plus in-ground improvements for square footage thereafter (over 100 SF) $2.00/SF NA $2.00/SF
SECTION 2 -TRANSPORTATION PERMITS
Oversized Load (Transportation Permit/Wide-Load
Permit) 16.00 NA 16.00
Annual Permit - Per Vehicle (Transportation Permit/WideLoad Permit) 90.00 NA 90.00 SECTION 3 - FINAL MAP & IMPROVEMENT PLAN REVIEW & INSPECTION 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
- Per Major Subdivision Review, 5 or more parcels,
(Deposit)
2.5% of construction cost or $8,000, whichever is greater
2.5% of bond est.
for imp, $8485 min 1.041
2.5% of bond est.
for imp, $8833
min
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
- Per Minor Subdivision Review, 4 or fewer parcels,
(Deposit)
2.5% of construction cost or $6,000, whichever is greater
2.5% of bond est.
for imp, $6498 min 1.041
2.5% of bond est.
for imp, $6764
min
New lot fee
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 New lot fee, actual cost of County fee ($50 as of 1 July 2007) 50.00 NA 50.00
Final Subdivision Inspection Fee (Deposit)
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
na
Final Subdivision Map and Improvement Plan Review Fee
Description
not applicable na not applicable
ECI
Factor
na
Public Works June 16, 2026 2761 Page 56 of 81
PUBLIC WORKS FEES
CURRENT FEE Factor PROPOSED FEE Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
Description ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
- Per Major Subdivision Review, 5 or more parcels,
(Deposit)
3% of construction cost or $7,000, whichever is greater 3% of bond est. for
imp, $7580 min 1.041
3% of bond est.
for imp, $7891
min
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
- Per Minor Subdivision Review, 4 or fewer parcels,
(Deposit)
3% of construction cost or $3,000, whichever is greater 3% of bond est. for
imp, $3249 min 1.041
3% of bond est.
for imp, $3382
min
SECTION 4 - PROJECT ACCEPTANCE
Major Subdivision Map ( 5 or more parcels)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Acceptance of improvements and dedications (Fee) 5,007.00 1.041 5,212.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Amendment of subdivision agreement 2,922.00 1.041 3,042.00 Minor Subdivision Map (4 or fewer parcels)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Acceptance of improvements and dedications (Fee) 1,876.00 1.041 1,953.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Amendment of subdivision agreement 1,043.00 1.041 1,086.00 SECTION 5 - GRADING PLAN REVIEW
Grading Permit Plan Review
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 0 to 50 CY 572.00 1.041 595.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 51 to 1,000 CY 1,192.00 1.041 1,241.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 1,001 to 10,000 CY 1,789.00 1.041 1,862.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 10,001 CY and above (Deposit) 2,979.00 1.041 3,101.00 n/a n/a n/a n/a n/a
Additional plan review for complex grading, and changes, additions or revisions to approved plans cost n/a cost
SECTION 6 - OTHER ENGINEERING PERMITS
not applicable na not applicable na na Traffic Control Plan Review cost NA cost 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Certificate of Correction Review 1,043.00 1.041 1,086.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City-installed Traffic Controlled Devices (Stop signs, Yield, speed undulations, etc.) 835.00 1.041 869.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City-installed street light 625.00 1.041 651.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Letter of Map Revision / Amendment 1,043.00 1.041 1,086.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Easement Dedication (utility) 1,251.00 1.041 1,302.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Watercourse Permit Fee, Fixed fee, … 626.00 1.041 652.00 not applicable na not applicable na na … plus 5% of construction cost within the public right of way (Deposit)
5% of construction
cost NA 5% of construction cost
not applicable na not applicable na na Consultant Services Actual Cost + 10% NA Actual Cost + 10%
SECTION 7 - REVIEW OF PLANNING APPLICATION
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Initial Engineering Review 149.00 1.041 155.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Lot Line Adjustment or Parcel Merge 894.00 1.041 931.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tentative Parcel Map (0-4 lots) 3,756.00 1.041 3,910.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Certificate of Compliance 1,043.00 1.041 1,086.00
Grading permit plan review (flat fee). Includes stormwater Public Works June 16, 2026 2762 Page 57 of 81
PUBLIC WORKS FEES
CURRENT FEE Factor PROPOSED FEE Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
Description ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tentative Subdivision Map (5 to 25 lots) 3,337.00 1.041 3,474.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tentative Subdivision Map (26 to 100 lots) 4,172.00 1.041 4,343.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tentative Subdivision Map (101 to 200 lots) 5,007.00 1.041 5,212.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tentative Subdivision Map (201+ lots) 6,676.00 1.041 6,950.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Preliminary Plan 894.00 1.041 931.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Development Plan 894.00 1.041 931.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Street Vacation 1,192.00 1.041 1,241.00 SECTION 8 - HOURLY RATES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City Engineer 415.00 1.041 432.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Capital Projects Manager 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Civil Engineer 316.00 1.041 329.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Associate Civil Engineer 296.00 1.041 308.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Engineer II 238.00 1.041 248.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Engineer I 209.00 1.041 218.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Engineering Infrastructure Admin 289.00 1.041 301.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Construction Inspector II 238.00 1.041 248.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Construction Inspector I 209.00 1.041 218.00 SECTION 9 - FEES FOR DUPLICATION
not applicable 35.00 NA 35.00
not applicable 60.00 NA 60.00
SECTION 10 - FEES FOR REPORTS
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Report and/or invoice preparation 327.00 1.041 340.00 Fee used to charge for DIMO's time in preparing the paperwork Fees for Work Performed by City Staff - Includes work performed Sale of Plans and Specifications for Construction Jobs-- From $35 (hardcopy) - $60.00 (cost for printing and
mailing)
na not applicable na na
Public Works June 16, 2026 2763 Page 58 of 81
PUBLIC WORKS - ENGINEERING FEES
CURRENT FEE Factor PROPOSED FEE
SECTION 1 - ENCROACHMENT PERMITS
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Encroachment Permit Base Fee (≤ 3 days) for
encroachment in, on, over, or under any City Right-ofway. If encroachment refund is requested, once verified work was not done, refund will be made to applicant less 20%.
626.00 1.041 652.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Encroachment Permit Fee – Major (for work lasting more
than 3 days; additional fees apply starting on the 4th day 202/day 1.041 210.00/day na na na na na Overtime Inspection Fee - “at-cost”, based on 1.5 times the applicable hourly rate.
Cost (1.5 × hourly
rate) na Cost (1.5 × hourly rate)
na na na na na
Encroachment Bond (for work involves removal and
replacement of existing asphalt) $500 or 25% of the
work valuation,
whichever is greater
na
$500 or 25% of
the work valuation,
whichever is
greater
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Monitoring/Boring Wells 626.00 1.041 652.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Facility Placement (Pods, debris boxes), up to 10 days. 237.00 1.041 247.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Encroachment Agreement Fee 1,134.00 1.041 1,180.00 Concrete Permit - curb, gutter, sidewalk, and driveway
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Concrete Permit 244.00 1.041 254.00 SECTION 2 - OTHER ENGINEERING FEE RELATED TO PERMITS
not applicable na not applicable na na Traffic Control Plan Review – “at-cost” based on the Senior Engineer hourly rate cost na cost
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Plumbing Permit Fee 211.00 1.041 220.00 not applicable na not applicable na na Document retrieval fee (reproduction costs only - see fees for duplication) cost na cost
not applicable na not applicable na na Consultant Services Actual Cost + 10% na Actual Cost +
10%
Violation - Working Without Encroachment Permit (Public Right-of-Way) Working in public Right-of-Way without the appropriate
encroachment permit
Fine equal to the
applicable permit
fee
-
Fine equal to the
applicable permit
fee
SECTION 3 - HOURLY RATES
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for
services not otherwise listed.
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City Engineer 416.00 1.041 433.00
UTILITIES
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
City of Richmond
MASTER FEE SCHEDULE
Description
PW - Engineering June 16, 2026 2764 Page 59 of 81
PUBLIC WORKS - ENGINEERING FEES
CURRENT FEE Factor PROPOSED FEE Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
City of Richmond
MASTER FEE SCHEDULE
Description
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Capital Projects Manager 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Civil Engineer 315.00 1.041 328.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Associate Civil Engineer 296.00 1.041 308.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Engineer II 238.00 1.041 248.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Engineer I 209.00 1.041 218.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Engineer Asset Administrator 289.00 1.041 301.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Construction Inspector II 238.00 1.041 248.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Construction Inspector I 209.00 1.041 218.00 SECTION 4 - FEES FOR DUPLICATION
not applicable 35.00 na 35.00
not applicable 55.00 na 55.00
not applicable na not applicable na na Photocopying, per page (8-1/2 x 11) 0.10 na 0.10 not applicable na not applicable na na Plan size (24"x36"), per page 9.00 na 9.00 not applicable na not applicable na na Plotting - Refer to GIS fees for Custom Maps and Predefined Maps cost na cost
not applicable na not applicable na na Digital Imaging Fee - Parcel Map, Tract Map or Improvement Plans, plus 25.00 na 25.00
not applicable na not applicable na na Per sheet to be imaged 2.00 na 2.00
MISCELLANEOUS FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Bike plan Check - Per hour 260.00 1.041 271.00 Refunds for Permit Cancellations Fees
Cancelled permits are eligible for an 80% refund, upon approval by the Public Works Director. 20% of the fee is retained to recover the estimated average costs of the City’s administrative and technical efforts required to initiate and facilitate the permitting process.
Plan Check Review fees are non-refundable.
Sale of Plans and Specifications for Construction Jobs--From $35 (hardcopy) - $55.00 (cost for printing and mailing) na not applicable na na PW - Engineering June 16, 2026 2765 Page 60 of 81
PUBLIC WORKS - STORMWATER FEES
CURRENT FEE Factor PROPOSED FEE
STORMWATER
Commercial Stormwater Annual Permit Fee
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Commercial Stormwater Annual Permit Fee 876.00 1.041 912.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Industrial Stormwater Annual Permit Fee 1,591.00 1.041 1,656.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Follow Up Inspection 717.00 1.041 746.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 One time discharge inspection 717.00 1.041 746.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Monitoring, sampling or testing fee 894.00 1.041 931.00 not applicable na not applicable na na Laboratory analysis cost and rental equipment charges, cost plus 10%, as needed cost + 10% na cost + 10%
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 C.3 Stormwater Control Plan Review (SWCP) 9,348.00 1.041 9,731.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Low impact development annual inspections (bio-swales
infiltration planters)
Low impact development installation/construction
inspection fee (for every 5 bio-swales, inflow planters, tree wells or other devices)
717.00 1.041 746.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
C.6 SWPPP Monthly Inspection & Compliance (Monthly
fee to be multiplied by # months planned duration of
construction)
501.00 1.041 522.00
ECI
Factor
City of Richmond
Description
ECI Index for
proposed
increase
Last increase
implemented
Index Effective
date for
proposed
increase
MASTER FEE SCHEDULE
ECI Index for
last increase
Stormwater Collection System Service Fee, Stormwater Collection System Collection Fee (See Building Regulations, this fee is collected by Building Regulations) Site Inspection Fee
Industrial Stormwater Annual Permit Fee
C.6 Construction sites greater than 1 acre or determined to be a significant threat to water quality
C.3 Fees for projects which create or replace more than 10,000 square feet of impervious surface or 5,000 square feet for auto service, retail gas stations, restaurants, uncovered parkinglots, (fee is not applicable when a
Subdivision plan check fee is collected covering these fees as applicable)
PW - Stormwater June 16, 2026 2766 Page 61 of 81
PUBLIC WORKS - STORMWATER FEES
CURRENT FEE Factor PROPOSED FEE ECI
Factor
City of Richmond
Description
ECI Index for
proposed
increase
Last increase
implemented
Index Effective
date for
proposed
increase
MASTER FEE SCHEDULE
ECI Index for
last increase
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Monthly Inspection ( monthly fee to be multiplied by # months planned duration of construction) 356.00 1.041 371.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Plan review fee (1 hour) 238.00 1.041 248.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Stormwater Encroachment Permit 614.00 1.041 639.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Watercourse Permit Fee, Fixed fee, … 626.00 1.041 652.00
HOURLY RATES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
DEPARTMENT DIRECTOR
461.00 1.041 480.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
ENVIRONMENTAL SERVICES MANAGER
391.00 1.041 407.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
PROJECT COORDINATOR
314.00 1.041 327.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
ADMINISTRATIVE SERVICES ANALYST
248.00 1.041 258.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
ADMINISTRATIVE AIDE
193.00 1.041 201.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
SR ENV. COMP. INSP
321.00 1.041 334.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
ENV. COMP. INSP.
266.00 1.041 277.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
ENGINEER ASSET ADMIN
329.00 1.041 342.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
WASTEWATER CONTRACT/CONSULTANT
240.00 1.041 250.00
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for services not otherwise listed.
STORMWATER PERMIT FEES
Stormwater Plan Review for projects not required to submit a SWCP
C.6 Construction sites less than 1 acre or determined not to be a significant threat to water quality
PW - Stormwater June 16, 2026 2767 Page 62 of 81
PUBLIC WORKS - WASTEWATER FEES
CURRENT FEE Factor PROPOSED FEE
WASTEWATER
not applicable na not applicable na na - FY 19-20, per SSU 880.00 NA 880.00 not applicable na not applicable na na - FY 20-21, per SSU 940.00 NA 940.00 not applicable na not applicable na na - FY 21-22, per SSU 1,000.00 NA 1,000.00 not applicable na not applicable na na - FY 22-23, per SSU 1,070.00 NA 1,070.00 not applicable na not applicable na na - FY 23-24, per SSU 1,140.00 NA 1,140.00 not applicable na not applicable na na - FY 24-25, per SSU 1,210.00 NA 1,210.00 Richmond Municipal Sewer District No. 1, multi-unit residential, annual not applicable na not applicable na na - FY 19-20, per SSU 707.00 NA 707.00 not applicable na not applicable na na - FY 20-21, per SSU 752.00 NA 752.00 not applicable na not applicable na na - FY 21-22, per SSU 800.00 NA 800.00 not applicable na not applicable na na - FY 22-23, per SSU 856.00 NA 856.00 not applicable na not applicable na na - FY 23-24, per SSU 912.00 NA 912.00 not applicable na not applicable na na - FY 24-25, per SSU 968.00 NA 968.00 Richmond Municipal Sewer District No. 1, commercial and industrial, annual not applicable na not applicable na na FY 20-21 $67.00 per IWU, $1.42 per lbs BOD and $0.66 per lbs TSS but not less than $553. 553.00 NA 553.00 not applicable na not applicable na na FY 21-22 $71.02 per IWU, $1.50 per lbs BOD and $0. 70 per lbs TSS but not less than $586. 586.00 NA 586.00 not applicable na not applicable na na FY 22-23 $75.99 per IWU, $1.61 per lbs BOD and $0. 7 5 per lbs TSS but not less than $627. 627.00 NA 627.00 not applicable na not applicable na na FY 23-24 $81.31 per IWU, $1. 72 per lbs BOD and $0.83 per lbs TSS but not less than $671. 671.00 NA 671.00 not applicable na not applicable na na FY 24-25 $87.00 per IWU, $1.84 perlbs BOD and $0.86 per lbs TSS but not less than $718. 718.00 NA 718.00 Wastewater Discharge Permitting Program
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Annual Permit fee, Class I A (Categorical Industrial Users as defined in 40 CFR Chapter I Subchapter N)
discharging more than 25,000 gallons of wastewater per
day
4,507.00 1.041 4,692.00
Sewer Service Fees, Richmond Municipal Sewer District, Sanitary Sewer Connection Fee (See Building Regulations, this fee is collected by Building Regulations) Sanitary System Sewer Charges
Richmond Municipal Sewer District No. 1, single unit residential, annual Last increase
implemented
Index Effective
date for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
ECI Index for Description
last increase
ECI Index for
proposed
increase
ECI
Factor
PW - Wastewater June 16, 2026 2768 Page 63 of 81
PUBLIC WORKS - WASTEWATER FEES
Last increase CURRENT FEE Factor PROPOSED FEE
implemented
Index Effective
date for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
ECI Index for Description
last increase
ECI Index for
proposed
increase
ECI
Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Annual Permit fee, Class I B (Categorical Industrial Users as defined in 40 CFR Chapter I Subchapter N)
discharging less than 25,000 gallons of wastewater per
day
3,955.00 1.041 4,117.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Annual Permit fee, Class II A (Significant Industrial User as defined in 40 CFR 403.3(t) - discharging more than
25,000 gallons of wastewater per day)
3,898.00 1.041 4,058.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Annual Permit fee, Class II B (Significant Industrial User as defined in 40 CFR 403.3(t) - discharging less than
25,000 gallons of wastewater per day)
3,616.00 1.041 3,764.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit fee, Class III (Industrial User as determined by the Control Authority) 1,570.00 1.041 1,634.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit fee, Class IV (Commercial Facility as determined by the Control Authority) 961.00 1.041 1,000.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Annual Permit fee, Class VI (one-time discharger, discharging less than 60,000 gallons) 1,131.00 1.041 1,177.00 not applicable na na na na
Baseline Monitoring Report Review for New Categorical
Dischargers as defined in 40 CFR Chapter I, Subchapter
N) charged at cost plus overhead
cost NA cost
Wastewater Inspection Program
not applicable na na na na Additional Site Inspection fee charged at cost plus overhead cost NA cost
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Violation Site Visit Inspection Charge, per site 330.00 1.041 344.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Violation Site Visit Inspection Charge, per site, when site includes monitoring, sampling or testing 1,071.00 1.041 1,115.00 not applicable na not applicable na na Violation Laboratory Charges, cost plus 10%, as needed cost + 10% NA cost + 10% Fats Oils and Grease Program Fees
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041
Annual Permit fee, Class V (Commercial Facility
classified as a Fats, Oils and Grease "FOG" as
determined by the Control Authority)
364.00 1.041 379.00
not applicable na not applicable na na Additional Site Inspection fee charged at cost plus overhead cost NA cost
not applicable na not applicable na na
Food Handling Facilities with Grinders and no treatment system - 10% surcharge will be added to the annual
sewer service fees
fee + 10% NA fee + 10%
not applicable na not applicable na na First Violation 250.00 NA 250.00 PW - Wastewater June 16, 2026 2769 Page 64 of 81
PUBLIC WORKS - WASTEWATER FEES
Last increase CURRENT FEE Factor PROPOSED FEE
implemented
Index Effective
date for
proposed
increase
City of Richmond
MASTER FEE SCHEDULE
ECI Index for Description
last increase
ECI Index for
proposed
increase
ECI
Factor
not applicable na not applicable na na Second Violation 500.00 NA 500.00 not applicable na not applicable na na Third Violation 1,000.00 NA 1,000.00 Wastewater Plan Review Fee
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sewer connection plan review fee (<1 hour) 238.00 1.041 248.00 not applicable na not applicable na na Additional Staff time for Plan Review charged at cost plus overhead cost NA cost
Wastewater Treatment System Plan Review Fee,
position times hours
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Expedited Plan Review Fee - Min 2hrs 1,385.00 1.041 1,442.00 Certificate of Lateral Compliance
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Issuance of Certificate of Lateral Compliance after sewer line repairs are complete and inspected 219.00 1.041 228.00
WASTEWATER PERMIT FEES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Wastewater Encroachment Permit 626.00 1.041 652.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sewer Connection Fee (RMC §12.20) 3,584.00 1.041 3,731.00 Miscellaneous
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Pre & post sewer lateral video review 128.00 1.041 133.00
HOURLY RATES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 DEPARTMENT DIRECTOR 461.00 1.041 480.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ENVIRONMENTAL SERVICES MANAGER 391.00 1.041 407.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PROJECT COORDINATOR 314.00 1.041 327.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ADMINISTRATIVE SERVICES ANALYST 248.00 1.041 258.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ADMINISTRATIVE AIDE 193.00 1.041 201.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 SR ENV. COMP. INSP 321.00 1.041 334.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ENV. COMP. INSP. 266.00 1.041 277.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ENGINEER ASSET ADMIN 329.00 1.041 342.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 WASTEWATER CONTRACT/CONSULTANT 240.00 1.041 250.00 Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for services not otherwise listed.
PW - Wastewater June 16, 2026 2770 Page 65 of 81
RENT PROGRAM FEES
CURRENT FEE Factor PROPOSED FEE
RESIDENTIAL RENTAL HOUSING FEE
Not applicable N/A Not applicable N/A N/A Per Controlled Rental Unit 267.00 0.978 261.00 Not applicable N/A Not applicable N/A N/A Per Partially Covered Rental Unit 151.00 0.987 149.00 Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Fees as approved by the Rent Board - date May 13, 2026
Current rates can be found here: https://www.ci.richmond.ca.us/3679/Fees City of Richmond
Master Fee Schedule
Description
Administration of the Fair Rent, Just Cause for Eviction, and Homeowner Protection Ordinance
Rent Control June 16, 2026 2771 Page 66 of 81
TRANSPORTATION DEPARTMENT - R-TRANSIT FEES
CURRENT FEE Factor PROPOSED FEE
Not applicable N/A Not applicable N/A N/A Special Purpose Group Trip (Includes one driver with one vehicle) -- $100/hour 100.00 N/A 100.00
Not applicable N/A Not applicable N/A N/A Transit Service -- Book of Coupons = $20 20.00 N/A 20.00 Not applicable N/A Not applicable N/A N/A
One Way – Advance
Reservation (one to ten days in
advance)
4.00 N/A 4.00
Not applicable N/A Not applicable N/A N/A
One Way – Same Day
Reservation (Reservation is same day) 5.00 N/A 5.00
Not applicable N/A Not applicable N/A N/A
One Way Trip – Late
Cancellation (Cancellation one hour before pick up) or No show (Client is not at pick up location, is not ready,
cancels trip at the door, or refuses to take trip) Fee. {The fee is the cost of booked trip}
4.00 to 7.00 N/A 4.00 to 7.00
NOTES
(Fees are supplemented by grant funding; therefore, they are not adjusted based on ECI) With the new Measure J funding allocation voted on by WCCTAC, the City of Richmond could be getting more funding. If there is a substantial amount of funding, it would be used to provide later, after hours, and weekend service which has been a request by the community. The proposed farebox fee would prepare Paratransit in the event there is more funding.
City of Richmond
MASTER FEE SCHEDULE
ECI
Factor
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
R-TRANSIT SERVICES
Description
Transportation - R-Transit June 16, 2026 2772 Page 67 of 81
TRANSPORTATION DEPARTMENT - PARKING FEES
CURRENT FEE Factor PROPOSED FEE
Transportation - Parking Management Services
1 Neighborhood Parking Permits
2 Neighborhood Parking Permit -Residential Annual
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 3 In Person 47.00 1.041 49.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 4 Online 40.00 1.041 42.00 5 Neighborhood Parking Permit -Residential Visitor Hang tag -Annual
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 6 In Person 48.00 1.041 50.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 7 Online 40.00 1.041 42.00 8 Neighborhood Parking Permit- Residential Replacement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 9 In Person 47.00 1.041 49.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 10 Online 40.00 1.041 42.00 11 Neighborhood Parking Permit -Merchant Annual
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 12 In Person 47.00 1.041 49.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 13 Online 40.00 1.041 42.00 14 Neighborhood Parking Permit - Merchant Part Time
Employee -Quarterly
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 15 In Person 47.00 1.041 49.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 16 Online 40.00 1.041 42.00 17 Neighborhood Parking Permit- Merchant Visitor Pass
booklet (set of 10)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 18 In Person 47.00 1.041 49.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 19 Online 40.00 1.041 42.00 20 Electric Vehicle Charging
N/A N/A N/A N/A N/A 21 Electric Vehicle Charging Station- Rapid Charger $7/hr-$1/min. N/A $7/hr-$1/min.
N/A N/A N/A N/A N/A 22 Electric Vehicle Charging Station- Slow Charger $1 /hr 1-4 hrs then $5/Hr. N/A $1 /hr 1-4 hrs then $5/Hr.
23 Paid Parking
N/A N/A N/A N/A N/A 24 Metered Parking Rates (paid stalls) $1/hr N/A $1/hr N/A N/A N/A N/A N/A 25 Metered Parking Rates (paid stalls)- Special Event Daily rate for ea.
stall removed from
service
N/A
Daily rate for ea.
stall removed from
service
N/A N/A N/A N/A N/A 26 Marina Way Lot $1/hr, $4/Day,
$45/Mthly N/A $1/hr, $4/Day, $45/Mthly
N/A N/A N/A N/A N/A 27 Other Surface Lots, and 12th Street Garage $1/hr, $4/day,$45/Mthly N/A $1/hr, $4/day,$45/Mthly
28 Parklets/Curbs
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 29 Parklet Permits (per space) -special event 90.00 1.041 94.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 30 Parklet or Bike Corral Permit - 1 Year and renewals 259.00 1.041 270.00 31 Lot Leases
N/A N/A N/A N/A N/A 32 Metered Surface Lot Lease Daily Rate x 2.5 N/A Daily Rate x 2.5 City of Richmond
MASTER FEE SCHEDULE
Last increase Description
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Transportation-Parking June 16, 2026 2773 Page 68 of 81
TRANSPORTATION DEPARTMENT - PARKING FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase Description
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
N/A N/A N/A N/A N/A 33 Other Surface Lot Lease Based on lease terms N/A Based on lease terms
34 Parking Rental Fees
N/A N/A N/A N/A N/A 35 Parking Rental Fees Based on lease terms N/A Based on lease terms
36 Shared Mobility Services
37 Dedicated Public Parking Stalls - Mobility Operators N/A N/A N/A N/A N/A 38 Gas vehicles with dedicated parking public parking stalls
Determined upon
application based
on Actual Cost
N/A
Determined upon
application based
on Actual Cost
N/A N/A N/A N/A N/A 39 ZEV (zero emission vehicles) with dedicated public parking
Determined upon
application based
on Actual Cost
N/A
Determined upon
application based
on Actual Cost
40 Free Floating Car Share Vehicle Permits
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 41 Gas Vehicles (1 to 10 vehicles) 201.00 1.041 209.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 42 Gas Vehicles (More than 10 vehicles) 236.00 1.041 246.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 43 ZEV (1 to 10 vehicles) 151.00 1.041 157.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 44 ZEV (More than 10 vehicles) 177.00 1.041 184.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 45 Dedicated Car Share Vehicle Permits 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 46 Gas Vehicles - Operating from private property (1 to 10 vehicles) 376.00 1.041 392.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 47 Gas Vehicles - Operating from private property (More than 10 vehicles) 492.00 1.041 512.00
N/A N/A N/A N/A N/A 48 Gas vehicles - Parked/stored on public streets Parking Stall
Revenue
Calculations applied
N/A
Parking Stall
Revenue
Calculations
applied
N/A N/A N/A N/A N/A 49 ZEV (1 to 10 vehicles)
Based on
calculations related
to annual revenue
loss from the
indentified space(s)
minus 25% clean air
discount
N/A
Based on
calculations
related to annual
revenue loss from
the indentified
space(s) minus
25% clean air
discount
Transportation-Parking June 16, 2026 2774 Page 69 of 81
TRANSPORTATION DEPARTMENT - PARKING FEES
CURRENT FEE Factor PROPOSED FEE
City of Richmond
MASTER FEE SCHEDULE
Last increase Description
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
N/A N/A N/A N/A N/A 50 ZEV (More than 10 vehicles)
Based on
calculations related
to annual revenue
loss from the
indentified space(s)
minus 25% clean air
discount
N/A
Based on
calculations
related to annual
revenue loss from
the indentified
space(s) minus
25% clean air
discount
51 Bike Share/Scooter Providers
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 52 Permit Application Fee (staff costs to review permit) 1,778.00 1.041 1,851.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 53 Annual Permit Fee 117.00 1.041 122.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 54 Public Property Repair and Maintenance Endowment fee (Grant funded programs are exempted) 2,893.00 1.041 3,012.00 1-May-2022 150.70 1-Jul-2023 160.30 1.064 55 Private Shuttle Providers 1-May-2022 150.70 1-Jul-2023 160.30 1.064 56 Annual Permit to Operate 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 57 Gas Vehicles - per vehicle 236.00 1.041 246.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 58 ZEV - per vehicle 177.00 1.041 184.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 59 Special Event transportation 117.00 1.041 122.00 N/A N/A N/A N/A N/A 60 Dedicated Right of Way loading zones Determined upon
application based
on Actual Cost
N/A
Determined upon
application based
on Actual Cost
61 On Street Metered (Paid) Parking
N/A N/A N/A N/A N/A 62 Public parking stalls
Determined upon
application based
on Actual Cost
N/A
Determined upon
application based
on Actual Cost
Commuter Benefit Ordinance
The annual base flat permit fee of a dedicated space for a gas-powered car share vehicle is the annual base permit fee for metered spaces and annual base permit fee for time zone (non-metered) space, when parked at thos respective spaces.
The annual permit fee of a dedicated space for a zero emission powered (ZEV) car share vehicle is based on a 25% discount off the annual base permit free for metered spaces and a 25% discount off th annual base fee for time zone (non-metered) spaces (i.e., equla to 75% of the annual base permit fee). **The annual base flat permit fee for vehicles at a time zone(non-metered) space is $40 multiplied by 12 months.
* The annual base flat permit fee for a metered space is calculated as the average gross revenue per meter during the most recent completed fiscal year.
Transportation-Parking June 16, 2026 2775 Page 70 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Fully Burdened Hourly Rate Calculation
CITY ATTORNEY'S OFFICE
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Assistant City Attorney 2.0 192.00 1.041 200.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Chief Assistant City Attorney 1.0 217.00 1.041 226.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City Attorney (Currently Contract Position) 1.0 268.00 1.041 279.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Specialist 2.0 70.00 1.041 73.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Law Office Supervisor 1.0 116.00 1.041 121.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Assistant City Attorney 3.0 217.00 1.041 226.00 Total Full-Time Equivalents (FTEs) 10.0
CITY CLERK'S OFFICE
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City Clerk 1.0 170.00 1.041 177.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy City Clerk 3.0 125.00 1.041 130.00 Total Full-Time Equivalents (FTEs) 4.0
CITY COUNCIL
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Councilmember 6.0 31.00 1.041 32.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Coordinator 1.0 195.00 1.041 203.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Analyst 1.0 135.00 1.041 141.00 Total Full-Time Equivalents (FTEs) 8.0
CITY MANAGER'S OFFICE
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin Chief 1.0 161.00 1.041 168.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Chief Innovation Officer 1.0 141.00 1.041 147.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Grants Manager* 1.0 85.00 1.041 89.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 City Manager 1.0 332.00 1.041 346.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Community Engagement Mgr. 1.0 140.00 1.041 146.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Assistant to the City Manager 1.0 107.00 1.041 111.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Management Analyst/Associate Mgmt. Analyst (Communications Analyst) 1.0 66.00 1.041 69.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Manager 1.0 165.00 1.041 172.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sr. Management Analyst 1.0 118.00 1.041 123.00 Total Full-Time Equivalents (FTEs) 9.0
COMMUNITY DEVELOPMENT (Administrative
Services)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Associate Administrative Analyst (1 Term Position) 2.0 81.00 1.041 84.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Director of Community Development 1.0 309.00 1.041 322.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Administrative Analyst 2.0 189.00 1.041 197.00 COMMUNITY DEVELOPMENT (Building Services)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Inspector 3.0 137.00 1.041 143.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Inspector Supervisor 1.0 210.00 1.041 219.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Official 1.0 249.00 1.041 259.00 Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
Employee Hourly Rates June 16, 2026 2776 Page 71 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Building Official 1.0 209.00 1.041 218.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Industrial Building Inspector 1.0 210.00 1.041 219.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Plan Checking Engineer 2.0 200.00 1.041 208.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Permit Technician I/II 3.0 134.00 1.041 140.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Building Inspector 3.0 174.00 1.041 181.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Permit Technician 1.0 137.00 1.041 143.00 COMMUNITY DEVELOPMENT (Code Enforcement)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Code Enforcement Manager 1.0 349.00 1.041 363.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Code Enforcement Officer I/II 9.0 167.00 1.041 174.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Specialist 1.0 70.00 1.041 73.00 COMMUNITY DEVELOPMENT (Housing/Successor
Agency)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Housing Programs Analyst 1.0 147.00 1.041 153.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Housing Manager 1.0 238.00 1.041 248.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Housing Services Supervisor 1.0 178.00 1.041 185.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Planner 1.0 178.00 1.041 185.00 COMMUNITY DEVELOPMENT (Planning)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Assistant/Associate Planner 2.0 114.00 1.041 119.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Planning Manager 1.0 211.00 1.041 220.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Planning Technician I/II 2.0 80.00 1.041 83.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Principal Planner 1.0 202.00 1.041 210.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Coordinator (Term Position) 1.0 195.00 1.041 203.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Planner 3.0 178.00 1.041 185.00 Total Full-Time Equivalents (FTEs) 47.0
COMMUNITY POLICE REVIEW COMMISSION
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Analyst 0.1 135.00 1.041 141.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Confidential Investigator 1.0 289.00 1.041 301.00 Total Full-Time Equivalents (FTEs) 1.1
COMMUNITY SERVICES (Administration)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy City Manager (Moved from City Manager Office)
1.0 230.00 1.041 239.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Finance Manager II 1.0 151.00 1.041 157.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Associate Management Analyst 1.0 114.00 1.041 119.00 Total Full-Time Equivalents (FTEs) 3.0
COMMUNITY SERVICES (Employment & Training)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin Trainee(3 Term Positions) 4.0 107.00 1.041 111.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Analyst 2.0 135.00 1.041 141.00 Employee Hourly Rates June 16, 2026 2777 Page 72 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Services Coordinator 1.0 160.00 1.041 167.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Director of Community Services 1.0 286.00 1.041 298.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Workforce Program Manager 2.0 156.00 1.041 162.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Workforce Specialist I/II 12.0 135.00 1.041 141.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Director of Community Services 1.0 230.00 1.041 239.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Coordinator 1.0 195.00 1.041 203.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Accountant 1.0 121.00 1.041 126.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Vocational Construction Building Instructor 2.0 103.00 1.041 107.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Workforce Program Specialist 1.0 121.00 1.041 126.00 Total Full-Time Equivalents (FTEs) 29.0
COMMUNITY SERVICES (Library)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Library Services Manager 1.0 253.00 1.041 263.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Circulation Supervisor 1.0 199.00 1.041 207.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Director of Community Services - Library 1.0 301.00 1.041 313.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Assistant I/II 1.0 151.00 1.041 157.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Family Literacy Specialist 1.0 137.00 1.041 143.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Head of Reference 2.0 173.00 1.041 180.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Learning Center Coordinator 1.0 137.00 1.041 143.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Librarian I/II 9.0 154.00 1.041 160.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Library Assistant I/II 8.0 123.00 1.041 128.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Library Associate 2.0 151.00 1.041 157.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Library Information Systems Support Technician 1.0 130.00 1.041 135.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Literacy Program Manager 1.0 174.00 1.041 181.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Assistant 0.7 112.00 1.041 117.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Library Assistant 2.0 145.00 1.041 151.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Administrative Analyst 1.0 189.00 1.041 197.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Volunteer Tutor/Learner Coordinator 3.0 151.00 1.041 157.00 Total Full-Time Equivalents (FTEs) 35.7
COMMUNITY SERVICES (Office of Neighborhood
Safety)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Director of Community Services - ONS 1.0 261.00 1.041 272.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Management Analyst/ Associate Management Analyst 1.0 143.00 1.041 149.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Neighborhood Change Agents (1 Temporary) 12.0 95.00 1.041 99.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ONS Field Coordinator 2.0 106.00 1.041 110.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 ONS Program Manager 1.0 171.00 1.041 178.00 Total Full-Time Equivalents (FTEs) 18.0
COMMUNITY SERVICES (Recreation)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Accounting Asst 1.0 80.00 1.041 83.00 Employee Hourly Rates June 16, 2026 2778 Page 73 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant (1 Term Position) 2.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Services Coordinator 1.0 160.00 1.041 167.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin Analyst 2.0 135.00 1.041 141.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Aquatic Specialist 1.0 75.00 1.041 78.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Auditorium Aide 3.2 61.00 1.041 63.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Director of Community Services - Recreation 1.0 175.00 1.041 182.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Development Project Manager II 0.4 205.00 1.041 213.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Assistant I/II 1.0 123.00 1.041 128.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Lending Library Specialist 2.0 97.00 1.041 101.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Lifeguard 1.6 58.00 1.041 60.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Specialist 3.0 70.00 1.041 73.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Recreation Program Coordinator 9.0 119.00 1.041 124.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Recreation Program Specialist 3.2 118.00 1.041 123.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Recreation Supervisor 4.0 148.00 1.041 154.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Lifeguard 1.6 61.00 1.041 63.00 Total Full-Time Equivalents (FTEs) 37.0
COMMUNITY SERVICES (Community Crisis Response
Program CCRP)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Analyst/Associate 1.0 135.00 1.041 141.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Community Intervention Specialists 8.0 105.00 1.041 109.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Mental Health Clinician* 1.0 119.00 1.041 124.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Manager II - CCRP Manager 1.0 165.00 1.041 172.00 Total Full-Time Equivalents (FTEs) 11.0
DEPARTMENT OF CHILDREN AND YOUTH
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Community Services Technician I/II 1.0 66.00 1.041 69.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Management Analyst / Associate Management Analyst 3.0 94.00 1.041 98.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Management Analyst 1.0 125.00 1.041 130.00 Total Full-Time Equivalents (FTEs) 5.0
ECONOMIC DEVELOPMENT (Business/Economic
Development)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Director of Economic Development 1.0 263.00 1.041 274.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Assistant I/II 1.0 95.00 1.041 99.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Management Analyst/Associate Management Analyst 1.0 114.00 1.041 119.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sr. Business Assistance Officer 1.0 152.00 1.041 158.00 ECONOMIC DEVELOPMENT (Arts & Culture)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Arts & Culture Manager 1.0 161.00 1.041 168.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 Employee Hourly Rates June 16, 2026 2779 Page 74 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
ECONOMIC DEVELOPMENT (Environmental & Health
Initiatives)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Environmental Manager 1.0 167.00 1.041 174.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Management Analyst/Associate Management Analyst 2.0 114.00 1.041 119.00 ECONOMIC DEVELOPMENT (Port)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 CIP Manager* 1.0 167.00 1.041 174.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Management Analyst 1.0 114.00 1.041 119.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Port Director 1.0 375.00 1.041 390.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Sr. Business Assistance Officer 1.0 152.00 1.041 158.00 ECONOMIC DEVELOPMENT (Real Estate)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Development Project Manager II 1.0 159.00 1.041 166.00 Total Full-Time Equivalents (FTEs) 14.0
FINANCE
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Accountant I/II 5.0 115.00 1.041 120.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Accounting Assistant 5.0 80.00 1.041 83.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Accounting Manager 4.0 146.00 1.041 152.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Budget Analyst l/II 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Business License Specialist 3.0 95.00 1.041 99.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Buyer I/II 1.0 110.00 1.041 114.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Finance Manager 2.0 216.00 1.041 225.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Contract Compliance Administrator 1.0 134.00 1.041 140.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Director of Finance 1.0 203.00 1.041 211.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Director of Finance 1.0 257.00 1.041 268.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Payroll Coordinator 2.0 108.00 1.041 112.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Payroll Manager 1.0 149.00 1.041 155.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Accountant 4.0 121.00 1.041 126.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Budget Analyst 1.0 133.00 1.041 138.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Buyer 1.0 133.00 1.041 138.00 Total Full-Time Equivalents (FTEs) 33.0
FIRE
SWORN
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fire Chief 1.0 361.00 1.041 376.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Battalion Chief (Temporary increase of 1 FTE - Authorized 4) 5.0 278.00 1.041 289.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Fire Chief 1.0 320.00 1.041 333.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Fire Marshal (Temporary increase of 1 FTE - Authorized 4) 2.0 285.00 1.041 297.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fire Captain 24.0 260.00 1.041 271.00 Employee Hourly Rates June 16, 2026 2780 Page 75 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fire Engineer 24.0 230.00 1.041 239.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fire Fighter (Temporary increase of 11 FTE - Authorized 30) 41.0 225.00 1.041 234.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fire Inspector I/II 5.0 270.00 1.041 281.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Fire Marshal 1.0 288.00 1.041 300.00 Sub-total Sworn 104.0
NON-SWORN
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Services Coordinator 1.0 160.00 1.041 167.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Emergency Services Manager 1.0 159.00 1.041 166.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Coordinator Y-Rate 1.0 195.00 1.041 203.00 Sub-total Non-Sworn 4.0
Total Full-Time Equivalents (FTEs) 108.0
HUMAN RESOURCES
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy City Manager (Moved from Finance) 1.0 230.00 1.041 239.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Human Resources Manager 1.0 228.00 1.041 237.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Director of Human Resources 1.0 302.00 1.041 314.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Human Resources Technician I/II/III 2.0 116.00 1.041 121.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Human Resources Analyst I/II 4.0 143.00 1.041 149.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Human Resources Analyst Principal 2.0 191.00 1.041 199.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Human Resources Analyst Senior 2.0 159.00 1.041 166.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Manager I/II 1.0 165.00 1.041 172.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Risk Manager 1.0 197.00 1.041 205.00 Total Full-Time Equivalents (FTEs) 16.0
INFORMATION TECHNOLOGY | KCRT
Information Technology
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Business Systems Analyst I 1.0 175.00 1.041 182.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Duplicating/Mail Assistant 1.0 105.00 1.041 109.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Information Technology Assistant 1.0 134.00 1.041 139.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Information Technology Director 1.0 223.00 1.041 232.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Information Technology Manager 1.0 265.00 1.041 276.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Information Technology Support Specialist I/II 1.0 167.00 1.041 174.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Network & Systems Security Officer 1.0 311.00 1.041 324.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Network & Systems Specialist I/II 1.0 211.00 1.041 220.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Programmer Analyst 1.0 232.00 1.041 242.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Telecommunications Coordinator 1.0 203.00 1.041 211.00 KCRT
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Cable TV Manager 1.0 205.00 1.041 213.00 Employee Hourly Rates June 16, 2026 2781 Page 76 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Cable TV Programming Coordinator 1.0 167.00 1.041 174.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Cable TV Production Assistant 1.0 107.00 1.041 111.00 Total Full-Time Equivalents (FTEs) 13.0
MAYOR'S OFFICE
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Mayor 1.0 81.00 1.041 84.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Analyst 1.0 135.00 1.041 141.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Associate Management Analyst 1.0 133.00 1.041 138.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Assistant I 1.0 76.00 1.041 79.00 Total Full-Time Equivalents (FTEs) 5.0
POLICE
SWORN
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Asst Police Chief 1.0 350.00 1.041 364.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Captain 3.0 315.00 1.041 328.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Chief 1.0 380.00 1.041 396.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Lieutenant 10.0 281.00 1.041 293.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Officer 109.0 230.00 1.041 239.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Sergeant 23.0 260.00 1.041 271.00 Sub-total Sworn 147.0
NON-SWORN
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 4.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Assistant Police Property Technician 1.0 116.00 1.041 121.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Communications Dispatcher I/II/III 17.0 122.00 1.041 127.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Communications Manager 1.0 155.00 1.041 161.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Communications Shift Supervisor 4.0 125.00 1.041 130.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Crime Analysis Technician 1.0 99.00 1.041 103.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Crime Analyst 1.0 127.00 1.041 132.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Crime Prevention Manager 1.0 152.00 1.041 158.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Crime Prevention Specialist 1.0 104.00 1.041 108.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Crime Scene Technician 6.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Jailer 6.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Network and Systems Specialist I/II 2.0 138.00 1.041 144.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Assistant 1.0 112.00 1.041 117.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Parking Enforcement Representative 8.0 117.00 1.041 122.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Admin Manager 1.0 211.00 1.041 220.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Property Technician 1.0 122.00 1.041 127.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Records & Property Mgr. 1.0 146.00 1.041 152.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Police Records Specialist 9.0 105.00 1.041 109.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Public Safety Technology Supervisor 1.0 193.00 1.041 201.00 Employee Hourly Rates June 16, 2026 2782 Page 77 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Accountant 1.0 121.00 1.041 126.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Admin Analyst 1.0 189.00 1.041 197.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Systems Administrator 1.0 149.00 1.041 155.00 Sub-total Non-Sworn 70.0
Total Full-Time Equivalents (FTEs) 217.0
PUBLIC WORKS
Administration & Finance Division
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 4.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin Services Coordinator 1.0 160.00 1.041 167.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Assistant Deputy Director of Public Works 2.0 310.00 1.041 323.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Public Works Director - Operations and Maintenance 1.0 374.00 1.041 389.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Public Works Director - Capital Improvement | City Engineer 1.0 374.00 1.041 389.00
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Director of Public Works 1.0 330.00 1.041 344.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Assistant I/II 1.0 152.00 1.041 158.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Infrastructure Administrator 1.0 220.00 1.041 229.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Associate Admin Analyst 2.0 81.00 1.041 84.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Aide 0.8 61.00 1.041 64.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Administrative Analyst 1.0 189.00 1.041 197.00 Capital Improvement | Engineering
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Assistant/Associate Transportation Planner 1.0 173.00 1.041 180.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Capital Projects Manager 1.0 266.00 1.041 277.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Development Project Manager I/II 0.4 254.00 1.041 264.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Construction Inspector I/II 3.0 182.00 1.041 189.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Junior/Assistant Engineer 3.0 220.00 1.041 229.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Permit Technician I/II 1.0 134.00 1.041 140.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Civil Engineer 3.0 307.00 1.041 320.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Transportation Planner 1.0 241.00 1.041 251.00 Operations and Maintenance
Operations and Maintenance: Abatement
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Trades Worker I/II/Senior 1.0 175.00 1.041 182.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Equipment Operator 1.0 153.00 1.041 159.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Facilities Maintenance Worker I/II 1.0 118.00 1.041 123.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Maintenance Leadworker 3.0 142.00 1.041 148.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Maintenance Worker I/II 13.0 119.00 1.041 124.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Public Works Abatement Superintendent 1.0 293.00 1.041 305.00 Operations and Maintenance: Building Maintenance
Employee Hourly Rates June 16, 2026 2783 Page 78 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Carpenter 2.0 168.00 1.041 175.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Custodial Maintenance Supervisor 1.0 139.00 1.041 145.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Chief Electrician 1.0 206.00 1.041 214.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Electrician I/II 4.0 167.00 1.041 174.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Facilities Maintenance Worker I/II 11.0 118.00 1.041 123.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PW Facilities maintenance Superintendent 1.0 226.00 1.041 235.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Trades Worker I/II/Senior 2.0 175.00 1.041 182.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Painter 2.0 175.00 1.041 182.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Electrician 1.0 206.00 1.041 214.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Stationary Engineer 4.0 175.00 1.041 182.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Stationary Engineer Supervisor 1.0 187.00 1.041 195.00 Operations and Maintenance: Fleet
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Combo Equipment Lead Worker 1.0 171.00 1.041 178.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Combo Equipment Mechanic 6.0 156.00 1.041 162.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Equipment Mechanic III/Senior 3.0 142.00 1.041 148.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Equipment Parts Specialist 1.0 142.00 1.041 148.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Equipment Supervisor 1.0 204.00 1.041 212.00 Operations and Maintenance: Parks & Landscape
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Equipment Parts Specialist 1.0 142.00 1.041 148.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Gardener 4.0 152.00 1.041 158.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Groundskeeper 18.0 100.00 1.041 104.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Maintenance Leadworker 5.0 142.00 1.041 148.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Parks & Landscaping Superintendent 1.0 275.00 1.041 286.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Parks Construction & Maintenance Worker 6.0 119.00 1.041 124.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Parks Supervisor 4.0 144.00 1.041 150.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tree Leadworker 2.0 166.00 1.041 173.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Tree Trimmers 2.0 138.00 1.041 144.00 Operations and Maintenance: Streets & Signs
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Equipment Operator 10.0 153.00 1.041 159.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Maintenance Leadworker 2.0 142.00 1.041 148.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Maintenance Worker I/II 9.0 119.00 1.041 124.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 PW Streets Maintenance Superintendent 1.0 226.00 1.041 235.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Streets Supervisor 1.0 220.00 1.041 229.00 Total Full-Time Equivalents (FTEs) 157.2
PUBLIC WORKS (Water Resource Recovery)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Environmental Compliance Inspector 2.0 134.00 1.041 140.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Environmental Manager 1.0 208.00 1.041 217.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Water Resources Division Manager 1.0 250.00 1.041 260.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Civil Engineer 1.0 307.00 1.041 320.00 Employee Hourly Rates June 16, 2026 2784 Page 79 of 81
CITY WIDE - EMPLOYEE HOURLY RATES
Number of
Positions
FY2025-26
CURRENT FEE Factor PROPOSED
FEE
Description/Department
MASTER FEE SCHEDULE
City of Richmond
Last increase
implemented
ECI Index
for last
increase
Index
Effective
date for
proposed
increase
ECI Index
for
proposed
increase ECI Factor
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Environmental Inspector 1.0 157.00 1.041 163.00 Total Full-Time Equivalents (FTEs) 6.0
PUBLIC WORKS (Transportation)
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-transit Driver 2.0 94.00 1.041 98.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 R-transit Driver Leadworker 1.0 112.00 1.041 117.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Project Coordinator 1.0 195.00 1.041 203.00 Total Full-Time Equivalents (FTEs) 5.0
RENT PROGRAM
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Admin Services Coordinator 1.0 160.00 1.041 167.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Trainee 1.0 107.00 1.041 111.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Compliance Specialist 2.0 126.00 1.041 131.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Deputy Director Rent Program 1.0 288.00 1.041 300.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Director Rent Program 1.0 339.00 1.041 353.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Hearing Examiner Rent Program 1.0 288.00 1.041 300.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 General Counsel Rent Program 1.0 337.00 1.041 351.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Office Assistant 1.0 112.00 1.041 117.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Rent Program Analyst I/II 2.0 126.00 1.041 131.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Admin Analyst 1.0 189.00 1.041 197.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Management Analyst 1.0 219.00 1.041 228.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Staff Attorney Rent Program 1.0 289.00 1.041 301.00 Total Full-Time Equivalents(FTEs) 14.0
RICHMOND HOUSING AUTHORITY
1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Administrative Assistant 1.0 110.00 1.041 115.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Building Maintenance Supervisor 1.0 234.00 1.041 244.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Executive Director Housing Authority 1.0 376.00 1.041 391.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Resident Housing Manager 1.0 178.00 1.041 185.00 1-Jul-2025 174.40 1-Jul-2026 181.60 1.041 Senior Property Manager 1.0 251.00 1.041 261.00 Total Full-Time Equivalents (FTEs) 5.0
GRAND TOTAL ALL DEPARTMENTS 811.0
* Placeholder amounts while the City detemirnes final compensation Employee Hourly Rates June 16, 2026 2785 Page 80 of 81
Employment Cost Index
from: http://www.bls.gov/data/
Series Id: CIU3010000000000I
Not seasonally adjusted
Series Title:
Ownership: State and local government workers
Component: Total compensation
Occupation: All workers
Industry: All workers
Subcategory: All workers
Area: United States (National)
Periodicity: Index number
NOT SEASONALLY ADJUSTED
Year Qtr1 Qtr2 Qtr3 Qtr4
2017 131.6 131.9 133.0 134.2
2018 134.6 134.9 136.0 137.7
2019 138.3 138.6 139.7 141.7
2020 142.2 142.5 143.6 144.9
2021 145.4 145.8 146.9 148.6
2022 150.0 150.7 154.4 155.8
2023 157.3 157.9 160.3 165.9
2024 167.4 168.1 171.2 169.4
2025 170.9 171.6 174.4 176.4
2026 177.9 178.6 181.6
Difference 7.2
% Change 4.1%
Appendix A: Employment Cost Index
Total compensation for State and local
government workers in All industries
and occupations, Index
User Fees Updated in
2026
ECI-Gov June 16, 2026 2786 Page 81 of 81
1 DocID #18058v1
ORDINANCE NO. - 26
AN ORDINANCE OF THE CITY OF RICHMOND ESTABLISHING FEES IN
THE MASTER FEE SCHEDULE FOR SPECIFIED SERVICES RENDERED BY CITY DEPARTMENTS. THIS ORDINANCE AMENDS THE FEE SCHEDULE
WHICH WILL IMPLEMENT COST RECOVERY AND WILL SERVE AS THE BASIS FOR FUTURE FEE ADJUSTMENTS.
The City Council of the City of Richmond does ordain as follows:
SECTION 1. Section 2.34.040 of the City of Richmond Municipal Code is hereby amended to include the following fees within the various categories:
Description Percentage
of Costs
Proposed
Fees
COMMUNITY SERVICES - RECREATION
Rental: Memorial Auditorium Main Floor
Deposit--$1500 minimum (may be higher) 100% As Needed
Friday - Sunday, hourly (Half Main Floor) 100% As Needed Monday – Thursday, hourly (Half Main Floor) 100% As Needed Park Reservations: Civic Center Plaza
Deposit--$500 minimum (may be higher) 100% As Needed
Rental Fee for less than 100 participants 100% As Needed
COMMUNITY SERVICES - RECREATION - TOOL LIBRARY
Richmond Tool Library
Fine for Tier 1 (valued under $25) overdue tools, weekly per item 100% As Needed Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item 100% As Needed Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item 100% As Needed Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item 100% As Needed Fine for Tier 5 (valued over $400) overdue tools, weekly per item 100% As Needed Replacement charge per item lost, damaged, and unreturned 100% As Needed Fine for items returned in poor, dirty, condition 100% As Needed Mobile Tool Library
Fine for Tier 1 (valued under $25) overdue tools, weekly per item 100% As Needed Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item 100% As Needed Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item 100% As Needed Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item 100% As Needed Fine for Tier 5 (valued over $400) overdue tools, weekly per item 100% As Needed Replacement charge per item lost, damaged, and unreturned 100% As Needed Fine for items returned in poor, dirty, condition 100% As Needed
FIRE DEPARTMENT
PREVENTION SERVICES DIVISION
Fire & Life Safety Inspections (does not include applicable operational permits) Other Occupancy (F/H/L/S)
O 20,001+ sq. feet 100% As Needed
COMMUNITY DEVELOPMENT - PLANNING
Tobacco Retail License
2787
2 DocID #18058v1
Initial Tobacco Retail License Application (F) 100% As Needed Annual Tobacco Retail License (F) 100% As Needed
Tobacco Retail Appeal (F) 100% As Needed
Revocation (F) 100% As Needed
Suspension (F) 100% As Needed
SECTION 2. Commencing with the effective date of this ordinance, the fees established in Section 1, above shall be as follows, subject to adjustment in accordance with Richmond Municipal Code Section 13.45:
Description New Proposed Fees
COMMUNITY SERVICES - RECREATION
Rental: Memorial Auditorium Main Floor
Deposit--$1500 minimum (may be higher) New 1,500.00
Friday - Sunday, hourly (Half Main Floor) New 321.00
Monday – Thursday, hourly (Half Main Floor) New 257.00
Park Reservations: Civic Center Plaza
Deposit--$1500 minimum (may be higher) New 500.00
Friday - Sunday, hourly (Half Main Floor) New 63.00
COMMUNITY SERVICES - RECREATION - TOOL LIBRARY
Richmond Tool Library
Fine for Tier 1 (valued under $25) overdue tools, weekly per item New 1.00 Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item New 2.00 Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item New 5.00 Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item New 8.00 Fine for Tier 5 (valued over $400) overdue tools, weekly per item New 15.00 Replacement charge per item lost, damaged, and unreturned New Cost Fine for items returned in poor, dirty, condition New 5.00 Mobile Tool Library
Fine for Tier 1 (valued under $25) overdue tools, weekly per item New 1.00 Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item New 2.00 Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item New 5.00 Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item New 8.00 Fine for Tier 5 (valued over $400) overdue tools, weekly per item New 15.00 Replacement charge per item lost, damaged, and unreturned New Cost Fine for items returned in poor, dirty, condition New 5.00
FIRE DEPARTMENT
PREVENTION SERVICES DIVISION
Fire & Life Safety Inspections (does not include applicable operational permits) Other Occupancy (F/H/L/S)
O 20,001+ sq. feet New 905
COMMUNITY SERVICES - RECREATION - TOOL LIBRARY
Richmond Tool Library
Initial Tobacco Retail License Application (F) NEW 1,460.00 Annual Tobacco Retail License (F) NEW 730.00
Tobacco Retail Appeal (F) NEW 1,168.00
Revocation (F) NEW 2,044.00
Suspension (F) NEW 1,460.00
2788
3 DocID #18058v1
SECTION 3. Pursuant to Section 2.34.040 of the City of Richmond Municipal Code which provides for the establishment of a Master Fee Schedule for the fees to be charged by the various City departments for City services, the City Council of the City of Richmond hereby enacts a Master Fee Schedule that updates the fees assessed by the City departments to reflect the actual cost associated with providing the service. The Master Fee Schedule can be utilized as the basis for the future fee adjustments based on the Employment Cost Index.
SECTION 4. Severability. If any section, subsection, sentence, clause, phrase or portion of this ordinance is for any reason held invalid or unconstitutional by a court of competent jurisdiction, such holding shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed each and every section, subsection, phrase or clause of this ordinance irrespective of the fact that any one or more sections, subsections, phrases or clauses be declared invalid or unconstitutional, whether on its face or as applied.
SECTION 5. This ordinance shall be effective 30 days after passage and adoption. *****************************
First introduced at a regular meeting of the City Council of the City of Richmond held on May 19, 2026, and finally passed and adopted at a regular meeting held on May 19, 2026, by the following vote:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
Clerk of the City of Richmond
(SEAL)
Approved:
Mayor
2789
4 DocID #18058v1
Approved as to form:
City Attorney
2790
Master Fee Schedule Update
Emily Combs, Director of Finance
Mubeen Qader, Deputy Director of Finance
Antonio Bañuelos, Accounting Manager
1 City Council Meeting – May 19, 2026
2791
Agenda
2 • Recommended Action
• Updated Fees
• Next Steps
• Questions
2792
Recommended Action
HOLD a public hearing; and INTRODUCE an
Ordinance (first reading) establishing certain fees
for the proposed Master Fee Schedule.
3 2793
Why We Update the Master Fee Schedule
Ensure fees keep pace with
the City’s cost of providing
services, processing permits,
and performing inspections
Provide all departments a
regular opportunity to review,
clarify, and reorganize their
fee sections
Improve transparency and
usability for both the
community and City staff
Implement required updates,
including alignment with
State laws such as AB 602
4 2794
Overview of the 2026 Fee Updates
• Fee schedule adjusted to reflect changes in the Employment Cost Index (ECI) • Significant reorganization and clarity improvements across multiple departments
• Fire Department updates to align with the 2025 California Fire Code, including new, revised, and retired permit categories
• Recreation: Resident rates unchanged; new non-resident tier and Tool Library fees introduced
• City-wide hourly labor rates updated to include all approved positions • Enhanced usability: new cover page and new Table of Contents for easier navigation
5 2795
Department Highlights
• Fire Department:
• New and revised permits (Energy Storage Systems,
Fumigation/Insecticidal Fogging, Cannabis clarification) • New tiered structure for scrap tire storage, including small-site category
• Removal of obsolete categories and outdated permit column; simplified O4 fees into one capped tier
• Recreation:
• New non-resident tier (25% above resident rate)
• New Tool Library fines
• Updated Memorial Auditorium and Civic Center Plaza rental rates 6 2796
Department Highlights (continued)
• Community Development:
• New Tobacco Retail License fee suite
• Section reorganized for clarity
• Impact Fees: Continuing year 3 of Council-approved 4-year phased-in adjustments • Police / Code Enforcement:
• Taxi permit and alcohol/tobacco licensing fees reassigned to Code Enforcement
• Decoy-operation fees remain with Police as they are Police-run functions
• Public Works:
• Updated the Encroachment section to improve clarity and organization.
7 2797
Fee Updates: +4.1%
8 Employment Cost Index
from: http://www.bls.gov/data/
Series Id: CIU3010000000000I
Not seasonally adjusted
Series Title:
Ownership: State and local government workers
Component: Total compensation
Occupation: All workers
Industry: All workers
Subcategory: All workers
Area: United States (National)
Periodicity: Index number
NOT SEASONALLY ADJUSTED
Year Qtr1 Qtr2 Qtr3 Qtr4
2017 131.6 131.9 133.0 134.2
2018 134.6 134.9 136.0 137.7
2019 138.3 138.6 139.7 141.7
2020 142.2 142.5 143.6 144.9
2021 145.4 145.8 146.9 148.6
2022 150.0 150.7 154.4 155.8
2023 157.3 157.9 160.3 165.9
2024 167.4 168.1 171.2 169.4
2025 170.9 171.6 174.4 176.4
2026 177.9 178.6 181.6
Difference 7.2
% Change 4.1%
Appendix A: Employment Cost Index
Total compensation for State and local
government workers in All industries
and occupations, Index
User Fees Updated in
2026
Year % Change
2026 4.10%
2025 3.60%
2024 5.00%
2023 6.40%
2022 9.10%
2798
New Fees – Community Services
9 Description New Proposed Fees
COMMUNITY SERVICES - RECREATION
Rental: Memorial Auditorium Main Floor
Deposit--$1500 minimum (may be higher) New 1,500.00
Friday - Sunday, hourly (Half Main Floor) New 321.00
Monday – Thursday, hourly (Half Main Floor) New 257.00
Park Reservations: Civic Center Plaza
Deposit--$1500 minimum (may be higher) New 500.00
Friday - Sunday, hourly (Half Main Floor) New 63.00
COMMUNITY SERVICES - RECREATION - TOOL LIBRARY
Richmond Tool Library
Fine for Tier 1 (valued under $25) overdue tools, weekly per item New 1.00 Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item New 2.00 Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item New 5.00 Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item New 8.00 Fine for Tier 5 (valued over $400) overdue tools, weekly per item New 15.00 Replacement charge per item lost, damaged, and unreturned New Cost Fine for items returned in poor, dirty, condition New 5.00 Mobile Tool Library
Fine for Tier 1 (valued under $25) overdue tools, weekly per item New 1.00 Fine for Tier 2 (valued $25-$74.99) overdue tools, weekly per item New 2.00 Fine for Tier 3 (valued $75 - $199) overdue tools, weekly per item New 5.00 Fine for Tier 4 (valued $200 - $399) overdue tools, weekly per item New 8.00 Fine for Tier 5 (valued over $400) overdue tools, weekly per item New 15.00 Replacement charge per item lost, damaged, and unreturned New Cost Fine for items returned in poor, dirty, condition 2799 New 5.00 New Fees – Fire Department
10 Description New Proposed Fees
FIRE DEPARTMENT
PREVENTION SERVICES DIVISION
Fire & Life Safety Inspections (does not include applicable operational permits) Other Occupancy (F/H/L/S)
O 20,001+ sq. feet New 905
2800
New Fees – Community Development - Planning
11 Description New Proposed Fees
COMMUNITY DEVELOPMENT - PLANNING
Tobacco Retail License
Initial Tobacco Retail License Application (F) NEW 1,460.00 Annual Tobacco Retail License (F) NEW 730.00
Tobacco Retail Appeal (F) NEW 1,168.00
Revocation (F) NEW 2,044.00
Suspension (F) NEW 1,460.00
2801
Fiscal Impact of Fee Updates
12 Departments
Estimated Additional
Revenue Generated
Other 1,316
Police 8,742
Fire 27,661
Public Works 47,363
Community Development 374,238
Grand Total $459,321
2802
Next Steps
• Second Reading of Ordinance and Resolution approval on May 26 or June 2, 2026 • City-wide User Fee Study Underway (Estimated Completion: Spring 2027) • The City has retained Willdan to conduct a comprehensive User Fee Study for all City departments.
• Purpose: Modernize City's fee structure, improve transparency, and better align fees with actual cost of providing services.
• Traffic Impact Fee study
• Completion of Long-Range Transportation Study by end of FY 2025-26 • Updated Transportation Impact Fee study to City Council by December 2026 • Storm Drainage Rate Adjustment Study in 2027
• Storm Rate Adjustment taken to voters in Spring 2027
. 13
2803
Thank you
Questions/Comments?
14 2804
Recommended Action
HOLD a public hearing; and INTRODUCE an
Ordinance (first reading) establishing certain fees for the proposed Master Fee Schedule.
15 2805
MEETING DATE: April 10, 2026
TO: West Contra Costa Transportation Commission
FROM: Leah Greenblat, Transportation Planning Manager
SUBJECT: FY 26-27 Annual STMP Fee Adjustment
REQUESTED ACTION
Information only.
BACKGROUND AND DISCUSSION
The 2019 Subregional Transportation Mitigation Program (STMP) Update became effective on July 1, 2019. The Master Cooperative Agreement, signed by all participating member agencies, specifies an automatic annual fee adjustment so that the fees are kept in sync with construction-related costs (whether inflation or deflation). The agreement links the fee adjustment to the Engineering News Record’s February San Francisco Bay Area Construction Cost Index for the prior twelve months. It should be noted that Engineering News Record’s Bay Area Construction Cost Index is a source commonly used by jurisdictions to make annual fee adjustments. This year that rate of change was +0.1%. STMP fees will be adjusted upward for FY 26-27, accordingly. WCCTAC staff is in the process of notifying partner agencies of this impending annual fee adjustment, which becomes effective July 1, 2026, so it may be incorporated into their local fee schedules.
The STMP Quarterly Reporting form for FY 26-27 is included as an attachment and reflects the higher fees for FY 26-27. Local agency staff should begin using this version of the reporting form to report STMP fees collected after July 1, 2026.
The FY 25-26 and FY 26-27 STMP fees are shown below.
2806
Jurisdictions are required to submit this completed form to WCCTC no later than 30 days following the close of each calendar quarter; whether or not there are fees to submit, continuing through the life of the Master Cooperative Agreement.
Check Appropriate Box:
FY Q1 FY Q2 FY Q3 FY Q4
All sections of the report must be completed. July-Sept Oct-Dec Jan-Mar Apr-June Attach payment check to this report. 31-Oct 30-Jan 30-Apr 31-Jul Submit check and completed transmittal report to:
WCCTC
6333 Potrero Ave., Suite 100
El Cerrito, CA 94530
No development to report this period. OR
Insert below the # of Units or # of Sq. Ft. to calculate the amnt. of fee collected.
List each project or project component separately. Add rows as needed.
FY 26-27 STMP Fee Rate Corrected
Standard AB3177 Eligble
$ 6,915 $ 6,016
$ 3,407 $ 2,964
$ 1,868 $ 1,625
$ 4,425
$ 0.97
$ 8.38
$ 7.07
$ 11.09
$ 9,345
TOTAL FEES COLLECTED: $
This should be the amount of your check to WCCTC.
If a jurisdiction is collecting STMP fees for a development application at a rate different than what is currently in effect, provide on the following page the name and address of each development and which reason applies:
A. The development project is subject to a development agreement executed on _________________; B. The development submitted a vesting tentative map that was approved on ___________________; C. Other (explain legal basis for development not paying current adopted rates; n.b., a development application submitted West County Subregional Transportation Mitigation Program (STMP) Developer Fees JURISDICTIONS' QUARTERLY TRANSMITTAL REPORT FORM for FY 2026-2027 Corrected STMP Fee
per Sq. Ft.
Total # Units
or Sq. Ft.
Other (per AM pk hr trip)
Storage Facility
Industrial
Office
Single Family
Multi Family
Senior Housing
Hotel (per room)
Retail / Service
Type of Fee STMP $
Collected
STMP Fee per Unit: Project Address Project Name
2807
During the reporting period, has your agency granted:
1. STMP Fee Credits to any development? Yes No
2. STMP Fee Waivers/Exemptions to any development? Yes No If yes to either of the above, please respond to the questions on the next page.
If STMP Credits were granted, for each development complete the questions below:
1. What is the name and address of the development project receiving the credit?
2. What was the dollar value of the credit?
3. Which of the 20 STMP Projects was the credit used for?
4. What elements of the STMP project were completed with the credited funds? If Waivers/Exemptions of STMP Fees were granted, for each development, complete the questions below:
1. Were all other local fees waived/exempted for the development project? Yes No
2. Briefly explain why the development project's STMP fee was waived/exempted? Based on 6/30/2019. Revised 6/11/2026
Respond to Different Fee Rates/Credit and Waiver/Exemption Questions here:
2808
June 16, 2026
Human Resources
DATE: June 16, 2026
TO: Mayor Martinez and Members of the City Council
FROM: Nickie Mastay, Deputy City Manager, Internal Services Sharrone Taylor, Director of Human Resources
Subject: Annual Public Hearing on Vacancies
FINANCIAL IMPACT: There is no fiscal impact associated with this item.
PREVIOUS COUNCIL
ACTION:
None.
STATEMENT OF THE
ISSUE:
Government Code section 3502.3 requires public
agencies to hold a public hearing to present the status of vacancies and recruitment and retention efforts at least once per fiscal year, prior to adoption of the budget.
RECOMMENDED ACTION: HOLD a public hearing and RECEIVE a presentation on the status of vacancies and the City’s recruitment and
retention efforts in 2025 – Human Resources (Nickie
Mastay/Sharrone Taylor 510-620-6803). This item was
continued from the May 19, 2026, and May 26, 2026,
meetings.
DISCUSSION:
Government Code section 3502.3 requires public agencies to hold a public hearing to present the status of vacancies and recruitment and retention efforts at least once per AGENDA
REPORT
2809
June 16, 2026
fiscal year, and prior to the adoption of the final budget. City staff will present the following required information at the public hearing:
Information on the City of Richmond’s 2025 recruitment and retention efforts The status of 2025 vacancies at the City of Richmond
Any necessary changes to policies, procedures, and recruitment activities that may lead to obstacles in the hiring process
In addition, a bargaining unit shall be entitled to make a presentation at the public hearing at which the public agency presents the status of vacancies and recruitment and retention efforts for positions within that bargaining unit. The hearing will follow the procedures outlined in the Council Rules of Procedure and allow each bargaining unit to present for 10 minutes, since Government Code section 3502.3 is silent on the hearing procedures, including presentation times, pre-submission of materials, and other related considerations. The Service Employees International Union, Local 1021 (SEIU Local 1021), and the Richmond Police Officers Association (RPOA) have elected to present at the public hearing.
Background
In FY 20-21, the City of Richmond had ~581 FTEs; currently, there are ~673 FTEs, a net increase of 92 FTEs. In FY 26-27, the City of Richmond is currently anticipated to be able to afford ~684 FTEs due to rising inflation, increased health care costs, class and compensation increases, and bargaining unit increases. As additional revenue and expenses are finalized, the FY 26-27 recommended FTEs will be updated. City staff will monitor recent rapid increases in inflation and, as public safety MOUs are finalized, update projections to make recommendations to the City Council. 2025 Workforce and Recruitment Summary
This summary report provides transparency on staff vacancy rates, recruitment, retention, and promotion efforts and challenges, and offers an opportunity for public comments prior to budget adoption.
2025 Workforce Vacancy Average Snapshot
Average budgeted and authorized Full-Time Equivalent (FTE) positions: 802.4 Filled positions: 658.8
Total vacant positions:143.6
Net FTE increase: +2
Average vacancy rate: (18%).
Note: The average is calculated based on the number of FTE and vacancies at the end of each calendar month.
2025 Workforce Recruitment, Retention, and Promotions Snapshot During calendar year 2025, Human Resources implemented a range of initiatives to support recruitment, retention, and employee advancement. These efforts included 2810
June 16, 2026
maintaining competitive salaries and benefits, streamlining onboarding through NEOGOV (the City’s online recruitment and onboarding platform), expanding advertising to targeted professional associations and publications, conducting exit surveys, hosting employee engagement and health and wellness events, and providing classification-specific training. These efforts resulted in the following outcomes:
Total number of applications processed: 6,474
Total recruitments: 68
Total new hires: 91
Total promotions: 49
2025 Hires and Separations by Month
The table below presents monthly workforce data for calendar year 2025, including hires, promotions, position changes, and separations that occurred each month, as well as the total number of vacancies, FTE budgeted, and the corresponding percentage of FTEs vacant at the end of each month.
Month
2025 J F M A M J J A S O N D
FTE Budgeted 808 808 800 800 800 800 800 800 800 800 800 810 Hires 9 6 27 3 2 7 7 6 4 7 3 10
Promotions 3 5 3 6 4 11 4 2 2 4 3 2
Position
Change
-8 10
Separations -6 -7 -8 -3 -8 -3 -9 -6 -4 -8 -4 -9
Vacancies 162 162 135 135 141 137 139 140 140 141 142 151 Vacancy % 20% 20% 17% 17% 18% 17% 17% 18% 18% 18% 18% 19% The average vacancy rate for 2025 was 18 percent.
2025 Vacancy Information by Bargaining Unit
Bargaining unit vacancy rates were calculated by taking an average of each unit’s vacancy rate at the end of each month in 2025.
Bargaining Unit 2025 Vacancy
Rate
IFPTE Local 21 – Mid-Management Unit 23.5%
Service Employees International Union (SEIU) Local 1021 – General Employees Bargaining Unit 19.0%
Richmond Police Officers’ Association (RPOA) 17.8%
International Federation of Professional and Technical
Engineers (IFPTE) Local 21 – Executive Management Unit 15.0% 2811
June 16, 2026
International Association of Fire Fighters (IAFF) Local 188 8.7% SEIU Local 1021 – Part-Time and Intermittent Employees
Bargaining Unit 7.1%
Richmond Fire Management Association (RFMA) 3.3%
Richmond Police Management Association (RPMA) 1.4%
2025 Factors That Inform Hiring Processes and Vacancy Rates Several factors inform recruitment, hiring, retention, promotion, and vacancy rates.
These factors include:
Time-to-Hire: Civil service rules necessitate that we follow standardized procedures, testing requirements, public posting periods, and multiple approval steps designed to ensure fairness and transparency, along with extensive and necessary background checks.
Applicant Pool: For specific technical and specialized jobs, there is a decline in the number of qualified applicants.
Internal Movement: Internal promotions and transfers within the City maintain the vacancy rate. For example, when an employee leaves the City (e.g., due to retirement) a qualified internal candidate may fill that position through promotion or transfer; however, this then maintains a vacant position (the employee’s prior position) that needs to be filled.
Obstacles / Efforts
One additional factor that may be an obstacle to the recruitment and selection process is the minimum application filing period established by personnel rules. The requirement to accept applications for at least ten (10) days ensures broad access and transparency; however, it can also create unintended challenges depending on the classification. For entry-level positions, a ten-day filing period often results in a high volume of applications, many of which are likely to meet the minimum qualifications.
This can increase administrative burden, lengthen screening and selection timelines, and delay overall hiring. Conversely, for highly specialized or hard-to-fill classifications, extended recruitment windows do not necessarily yield a proportional increase in qualified applicants, resulting in prolonged vacancies despite sustained outreach efforts.
These dynamics may affect the efficiency and timeliness of hiring processes and suggest an opportunity to evaluate whether recruitment strategies and timelines can be more flexibly aligned with labor market conditions and classification-specific needs.
The Human Resources Department will use this data to evaluate whether recruitment strategies and timelines can be more flexibly aligned with labor market conditions and classification-specific needs.
2812
June 16, 2026
2025 Retention and Vacancy Creation
Although the City brought on 91 hires, additional vacancies have been created for several reasons. These include when new positions are approved, there is internal movement such as a promotion or transfer, or when an employee leaves the organization due to retirement, voluntary resignation, or involuntary termination. In addition, the City Council has requested new programs and staffing to support their goals and priorities.
In 2025, 108 new vacancies were created for the following reasons:
Newly added positions: 2
Internal promotions that created vacancies: 28
Internal transfers that created vacancies: 3
Total number of separations: 75
o Retirement: 22
o Resignation: 36
o Involuntary:14
o Other: 3
The City’s annual turnover rate was 11 percent, calculated as 75 separations divided by 659 (the average filled positions).
Reasons for Leaving the City
The chart below summarizes the four most common reasons employees cited for voluntarily separating from City employment. Information was gathered from a resignation letter, a conversation with the employee, and/or a voluntary exit questionnaire. For 13 voluntarily separated employees, the staff does not have information about their reasons for leaving.
Definitions
Retirement: permanent separation from one’s job position due to an eligible employee electing to receive retirement benefits through CalPERS. Resignations: Formal and voluntary separation from employment initiated by the employee, typically through written notice.
o Another Job: Separation from current job position to pursue employment with another organization, company, or self-employment. o Personal Pursuits/Reasons: Reasons attributed to personal circumstances or life changes identified by the employee, including relocating out of the area, going back to school, family commitments, etc.
2813
June 16, 2026
o Other Resignation: The City does not have a known reason for their resignation
Additional Data Provided through Exit Surveys
Employees voluntarily leaving City employment were given the opportunity to complete an optional exit questionnaire to share information regarding the factors influencing their decision to leave and about their experience.
The questionnaire was completed by 14 employees (25% of the 58 employees who retired or resigned). Eight (8) of those employees’ main reasons for leaving were either another job or personal pursuits/reasons. Although data is limited, here are the factors they cited regarding their decision to leave (employees could choose as many factors as applicable):
Career advancement (higher or different position) 5
Family/personal reasons 3
School 2
Flexible hours 2
Better benefits 1
Telework 1
Conflict 1
Regarding overall satisfaction, the average rating was 4 out of 5. Respondents were given the opportunity to provide additional feedback on their supervision and work environment.
Notably, 86 percent of respondents felt they were almost always given the tools to succeed and that their supervisors followed the rules and procedures. There was a 14 percent decrease between “almost always” (57%) and “usually” (43%) for being encouraged and listened to, indicating an area for improvement.
Retirement, 22,
38%
Another Job, 12,
21%
Personal
Pursuits/Reasons, 11,
19%
Other resignation
13 22%
2814
June 16, 2026
What did you think of the supervision you received in relation to the following:
Given the
tools to
succeed
Demonstrated
fair and equal
treatment
Encouraged and
listened to
suggestions
Followed
policies and
procedures
Almost Always 6 5 4 6
Usually 1 - 3 -
Sometimes - 2 - 1
Never - - - -
Year-to-Year Vacancy, Recruitment, and Retention Comparison The focus of this public hearing is to provide an update on vacancies and recruitment and retention efforts in the prior calendar year (2025). The City first conducted this public hearing in 2024 in accordance with California Government Code Section 3502.3.
Attachment 2 provides a comparison between the two years (2024 and 2025) for the key indicators. City staff will continue to update this attachment in future years.
DOCUMENTS ATTACHED:
Attachment 1 – Presentation (Draft)
Attachment 2 – Comparison with Prior Year
2815
AB 2561 Presentation
City of Richmond
Vacancies, Recruitment, and
Retention Efforts in 2025
Presented by Sharrone Taylor, Director of Human Resources May 19, 2026
DRAFT 1 2816
Agenda
o City-Wide Information
• Background
• What is AB 2561?
• Celebrate Successes
• Workforce Information
• Recruitment Information
• Vacancy Data
• Retention Information
• Obstacles and Efforts to Address
Recruitment and Retention
DRAFT 2 2817
Background
DRAFT
In FY 20-21, the City of Richmond had ~581 FTEs; currently, there are ~673 FTEs, a net increase of 92 FTEs. In FY 26-27, the City of Richmond is currently anticipated to be able to afford ~684 FTEs due to rising inflation, increased health care costs, class and compensation increases, and bargaining unit increases. As additional revenue and expenses are finalized, the FY 26-27 recommended FTEs will be updated. City staff will monitor recent rapid increases in inflation and, as public safety MOUs are finalized, update projections to make recommendations to the City Council.
3 2818
What is AB2561?
California Assembly Bill 2561 (2024), effective
January 1, 2025, mandates that local public agencies
hold a public hearing at least once per fiscal year to
report on job vacancies, recruitment, and retention
efforts. If the number of job vacancies within a single bargaining unit meets or exceeds 20% of the total
number of authorized full-time positions, the bill
would require the public agency, upon request of the
recognized employee organization, to include
specified information during the public hearing. By
imposing new duties on local public agencies, the bill
would impose a state-mandated local program.
4 DRAFT 2819
Celebrate
Successes!
• Hired and onboarded a total of 91
new people!
• Annual turnover rate reduced by 2%
in 2025
• Instituted trainings by job
classifications
• Held 10 staff engagement and
appreciation events!!
• Significantly brought down Richmond
Fire Management vacancy rate from
28.3% to 3.3% in one year!
5 DRAFT 2820
Workforce Information
City Manager City Attorney City Clerk City Council Community Development
Community
Services
(Recreation)
Department of
Children &
Youth
Economic
Development
& Port
Employment &
Training Finance Fire Human Resources
Information
Technology Library
Mayor
Office of
Neighborhood
Safety
Police Public Works Rent Program
Average Budgeted
Full-Time Positions
in 2025
802
DRAFT 6 2821
Average
Number of
Vacancies
Applications
Received
Hires
New
Positions
Promotions
Recruitments
91 6,474 2 49
2025 68
Recruitment
Statistics
DRAFT 7
143
2822
2024- 2025 Data Comparison
DRAFT
8 Metric 2025 2024
Citywide Total Vacancy Rate 18% 18%
Executive Management Vacancy Rate 15.0% 17.6%
Mid-Management Vacancy Rate 23.5% 24.6%
General Employees Vacancy Rate 19.0% 16.4%
Part-Time and Intermittent Employees Vacancy Rate 7.1% 9% Richmond Police Officers’ Association (RPOA) Vacancy Rate 17.8% 18.9% Richmond Police Management Association (RPMA) Vacancy Rate 1.4% 2.1% International Association of Fire Fighters (IAFF) Local 188 Vacancy Rate 8.7% 7.3% Richmond Fire Management Association (RFMA) Vacancy Rate 3.3% 28.3% Average FTE Budgeted 802 776
Average FTE Filled 659 635
Vacancies Created 108 179
Number of Hires 91 112
Number of Separations 75 85
Retirements 22 24
Resignations 36 42
Involuntary 14 16
Other 3 3
Annual Turnover Rate 2823 11% 13%
9 2025
Vacancy
Trends
Over
12 Months
135
151
162
Avg. 143.6 Vacancies
Jan. Feb. Mar. Apr. May Jun July Aug. Sept. Oct. Nov. Dec. DRAFT 2824 Vacancy Information by Month
Average Vacancy Percentage: 18%
Calendar Year 2025 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Budgeted FTEs 808 808 800 800 800 800 800 800 800 800 800 810 Hires 9 6 27 3 2 7 7 6 4 7 3 10
Promotions 3 5 3 6 4 11 4 2 2 4 3 2
Position Changes -8 10
Separations -6 -7 -8 -3 -8 -3 -9 -6 -4 -8 -4 -9
Vacancies 162 162 135 135 141 137 139 140 140 141 142 151 Vacancy Percentage 20% 20% 17% 17% 18% 17% 17% 18% 18% 18% 18% 19% DRAFT 10 2825
11 2025
Vacancies
Created
108 Vacancies Created
• # of Vacancies due to
Newly Budgeted
Positions: 2
• # of Vacancies due to
Internal Promotions: 28
• # of Vacancies due to
Internal Transfers: 3
• # of Vacancies due to
Separations: 75
New Positions
2%
Internal
Promotion
26%
Transfer
3%
Separation
69%
DRAFT 2826
2025 Retention Information (Separations)
75 Separations from City Service
• Retirement – 22
• Resignation – 36
• Involuntary – 14
• Other – 3
Annual Turnover Rate: 11%
Retirement
29%
Resignation
48%
Involuntary
19%
Other
4%
DRAFT 12 2827
2025 Reasons for Leaving
Factors Cited in Exit Questionnaire:
Retirement
38%
Personal Pursuits or
Reasons
19%
Another Job
21%
Other
Resignations
22%
13 Main Reason:
Other resignations = reasons not given
Better benefits
Career
advancement
(higher or different
position)
Flexible hours
Telework
School
Family/personal
reasons
Conflict
0 1
2 3
4 5
6 DRAFT 2828
2025 Vacancy Rate – By Bargaining Unit
Bargaining Unit Vacancy Rate
IFPTE Local 21 Mid-Management 23.5%
SEIU Local 1021 General Employees 19.0%
Richmond Police Officers Association 17.8%
IFPTE Local 21 Executive Management 15.0%
Fire Local 188 8.7%
SEIU Local 1021 Part-Time Unit 7.1%
Richmond Fire Management Association 3.3%
Richmond Police Management Association 1.4%
DRAFT 14 2829
• Council Goals and Objectives
• Goal Area #5: Strengthen the City’s Internal Infrastructure and Processes • Hiring and Retention
• Focus on Public Safety, Emergency Services, Parking Enforcement, Community Crisis Intervention Program
• Budget Implications:
• Balanced Budget Driven by Vacancy Savings: FY 2026-27 is balanced primarily through an assumed 12% vacancy rate ~ $16.4 million in savings.
• Salaries / Fringe Benefit Costs Rising
• Increases in salaries and benefits to maintain competitive salaries and offer benefits package
• Increases in OPEB
• Expenses outpace revenues
• Federal, State & Local Environment
• Budget cuts
• Funding Flexibility
• Unfunded Mandates - Vacancy Savings
• Hidden Costs
• Staff Morale, Burnout, Turnover
• Service Quality
• Reputational Risks
15 Strategic
Recruitment
& Hiring
DRAFT 2830
Recruitment
Process
Overview
Vacancy Created
Voluntary Separation, Retirement,
Involuntary Separation, Internal
Movement, Newly Budgeted
Position
Recruitment Requisition
Department submits a recruitment
requisition. Once it is approved
through workflow, HR is notified to
begin the process to fill the vacancy
Determine Recruitment Type
Utilize existing eligibility
list/ongoing recruitment, recruit
external & internal, or recruit
internal only
Job Posting
Advertise job opening and
recruitment on website and
networks. May be specialized based
on classification or job market.
Application Screening
Applications are screened to
determine if the applicants meet
minimum and desired qualifications
DRAFT 16 2831
Recruitment
Process
Overview
Examination
Candidates to pass examination
(written, oral interview, practical
skills assessment)
Employment List
Employment list established;
eligible candidates certified to
department in accordance with
Personnel Rules
Interviews Department interviews candidates
that have been certified
Conditional Job Offer
Candidate is extended a conditional
job offer, and completes a preemployment background process Final Job Offer
Candidate successfully completes
the background process and is
extended a final job offer with a
confirmed start date.
DRAFT 17 2832
Policies, Procedures, and Recruitment Enhancements
• Personnel Rules – Minimum Application Period (10 days) • High volume for entry-level roles: Extended filing periods often generate a large number of applications, including many that would meet minimum qualifications
• Increased volume requires additional staff time for selection screening, which can increase hiring timelines
• Limited yield for specialized roles: Longer recruitment windows do not necessarily result in more qualified applicants for hard-to-fill or specialized positions, contributing to longer time-to-fill • One-size timeline impacts efficiency
• Creates an opportunity to adjust timelines by role
• NEOGOV System Enhancements
• Continued implementing NEOGOV modules, to include streamlined onboarding process for new employees (implemented)
• Learn Module: Training by Classification – Courses are personalized by department and classification to guarantee that new employees acquire skills tailored to their specific classification The City routinely evaluates relevant policies, procedures, and recruitment efforts to pinpoint any possible barriers within its hiring process.
DRAFT 18 2833
Retention Efforts
• Competitive Compensation and Benefits
• Provided strong compensation and benefit enhancements through completed successor MOU negotiations with Executive Management Unit, Mid-Management Unit, General Employees Unit, Part-Time Employees Unit, and the Firefighters Unit
• Continuing successor MOU negotiations with Fire Management, Police Officers Association, and Police Management
• Training and Professional Development
• Building a high-performance Richmond through specialized training initiatives • CORE Institute – designed to enhance leadership, soft skills and mindfulness • REPU – training focused on Richmond’s Race Equity Plan and diversity and inclusion • Leadership Academy – to boost leadership and public sector employment relations knowledge • Promotional Pathways
• Internal recruitment and promotional opportunities resulted in promotions for 41 employees • Continued Enhancement of the Health and Wellness Program • Improved dental and vision benefits
• Expanded personel development reimbursment to include therapeutice and self help support • Promotion of added value programs that support employee health and wellness through our joint powers authority and benefits partners DRAFT 19 2834
Employee
Engagement
Events
Throughout the year, we have organized several employee appreciation events, including:
• All Employee Recognition & Service Awards
• Valentine’s Day Coffee Cart
• Beach Break with Italian Ice
• Health and Wellness Fair
• Cocoa and Color, and More!
DRAFT 20 2835
Thank You
DRAFT 21 2836
Public Hearing - Government Code section 3502.3
Status of Vacancies, Recruitment, and Retention Data Over Time April 2026
Metric 2025 2024
Citywide Total Vacancy Rate 18% 18%
Executive Management Vacancy Rate 15.0% 17.6%
Mid-Management Vacancy Rate 23.5% 24.6%
General Employees Vacancy Rate 19.0% 16.4%
Part-Time and Intermittent Employees
Vacancy Rate 7.1% 9%
Richmond Police Officers’ Association
(RPOA) Vacancy Rate 17.8% 18.9%
Richmond Police Management
Association (RPMA) Vacancy Rate 1.4% 2.1%
International Association of Fire Fighters
(IAFF) Local 188 Vacancy Rate 8.7% 7.3%
Richmond Fire Management Association
(RFMA) Vacancy Rate 3.3% 28.3%
Average FTE Budgeted 802 776
Average FTE Filled 659 635
Vacancies Created 108 179
Number of Hires 91 112
Number of Separations 75 85
Retirements 22 24
Resignations 36 42
Involuntary 14 16
Other 3 3
Annual Turnover Rate 11% 13%
2837
June 16, 2026
Public Works
DATE: June 16, 2026
TO: Mayor Martinez and Members of the City Council
FROM: Daniel Chavarria, Director of Public Works
Tawfic Halaby, Deputy Director of Public Works
José Valenzuela, Junior Engineer
Subject: Ordinance Modifying Chapter 12.19 of the Richmond Municipal Code entitled “Onsite Wastewater Treatment
Systems.”)
FINANCIAL IMPACT: There is no fiscal impact associated with adopting this ordinance. Any future expenditures related to
implementation would be funded through the approved
Wastewater Enterprise Fund budget (Account String:
40322631-400201).
PREVIOUS COUNCIL
ACTION:
January 18, 2022
March 1, 2022
February 21, 2023
April 4, 2023
February 18, 2025
April 1, 2025
STATEMENT OF THE
ISSUE:
The City currently prohibits new sewer connections to the Keller Beach Sanitary Sewer, halting new development in the area. To allow limited projects to proceed while
long-term solutions are developed, City staff proposes
amending the Richmond Municipal Code to permit the
use of temporary sewage holding tanks.
RECOMMENDED ACTION: INTRODUCE an ordinance (first reading) amending Chapter 12.19 of the Richmond Municipal Code entitled
"Onsite Wastewater Treatment Systems" to establish
temporary sewage holding tank construction standards
and a permitting process for properties unable to connect to the sanitary sewer system – Public Works Department
(Daniel Chavarria 510-620-5478/Tawfic Halaby 510-620-
5482/José Valenzuela 510-620-6955).
AGENDA
REPORT
2838
June 16, 2026
DISCUSSION:
The Keller Beach Sanitary Sewer (KBSS) Moratorium was enacted due to limited sanitary sewer capacity and infrastructure constraints within the Keller Beach area. The moratorium restricts the issuance of new sewer connections to protect public health and prevent overloading of the existing wastewater system while long term infrastructure solutions are evaluated and implemented.
As a result of the moratorium, certain properties within the affected area are unable to connect to the City’s sanitary sewer system, which has constrained development, redevelopment, and in some cases continued lawful occupancy. Temporary sewage holding tanks have been identified as a viable interim wastewater management solution in circumstances where permanent sewer service is unavailable, provided such systems are designed, installed, operated, and monitored in a manner that protects public health and the environment.
The proposed Temporary Sewage Holding Tank Construction Standards and Permitting Process establish a clear, enforceable framework for the temporary use of sewage holding tanks within the Keller Beach moratorium area. These standards allow development or continued use of properties to proceed on a limited and controlled basis while maintaining strict safeguards, including design requirements, setback criteria, alarm and monitoring systems, operational permits, and mandatory transition and abandonment requirements once permanent sewer service becomes available.
Although the immediate need for these standards is driven by the Keller Beach moratorium, the proposed action is intentionally structured to apply City-wide. Sanitary sewer capacity constraints, emergency conditions, or other infrastructure limitations may arise in other areas of the City in the future. Adopting uniform standards and a permitting process currently ensures the City is prepared to address similar circumstances consistently, transparently, and defensibly without requiring ad-hoc or project specific policy decisions.
Importantly, adoption of these standards does not lift or weaken the Keller Beach moratorium, nor does it guarantee approval of development projects. Each application for a temporary sewage holding tank will continue to be reviewed on a case-by-case basis for compliance with the adopted standards, applicable Municipal Code provisions, and all other City requirements. The standards function as a regulatory tool that allows limited interim wastewater solutions while preserving the City’s authority to enforce the moratorium and require ultimate connection to permanent sewer infrastructure.
By adopting the proposed standards and permitting process, the City establishes a consistent regulatory framework that balances the need for limited development flexibility with the City’s responsibility to protect public health, environmental resources, and wastewater infrastructure both within the Keller Beach area and throughout the City 2839
June 16, 2026
DOCUMENTS ATTACHED:
Attachment 1 – Ordinance (RMC Code Chapter 12.19)
Attachment 2 – Ordinance (RMC Code Chapter 12.19 with proposed additions) Attachment 3 – Proposed Temporary Sewage Holding Tank Standards Attachment 4 – Proposed Temporary Sewage Holding Tank Permitting Process 2840
Ord. No. XX-XX N.S.
DocID #71289v1
ORDINANCE NO. XX-26 N.S,
AN ORDINANCE OF THE COUNCIL OF THE CITY OF RICHMOND, CALIFORNIA,
AMENDING ARTICLE XII OF THE MUNICIPAL CODE OF THE CITY OF RICHMOND BY ADDING AND AMENDING CHAPTER 12.19 TO REGULATE TEMPORARY SEWAGE
HOLDING TANK SYSTEMS
WHEREAS, the City of Richmond (“City”) is authorized by California Constitution, Article XI, Section 7 to make and enforce within its limits all local, police, sanitary and other ordinances and regulations not in conflict with general laws and that serve and protect the health, safety or welfare of the public; and
WHEREAS, the City approved and adopted Ordinance No. 09-19 N.S. amending Article XII of the Municipal Code by adding a Chapter 12.19 to regulate septic tanks and other onsite wastewater treatment systems; and
WHEREAS, the City approved and adopted Ordinance No. 01-22 N.S. establishing a temporary moratorium on the issuance of building permits requiring sewer connections to the Keller Beach sanitary sewer; and declaring the urgency thereof; and WHEREAS, the City approved and adopted Ordinance No. 05-22 N.S. establishing a 10- month and 15-day extension of Urgency Ordinance No. 01-22 imposing a temporary moratorium on issuance of building permits requiring new sewer connections to the Keller Beach Sanitary Sewer; and declaring an urgency thereof; and
WHEREAS, the City approved and adopted Ordinance No. 02-23 N.S. establishing a temporary moratorium for the Keller Beach Sanitary Sewer; and WHEREAS, the City approved and adopted Ordinance No. 03-23 N.S. establishing a 22- month and 15-day extension of Urgency Ordinance No. 02-23 imposing a temporary moratorium on issuance of building permits requiring new sewer connections to the Keller Beach Sanitary Sewer; and declaring an urgency thereof.; and
WHEREAS, the City approved and adopted Ordinance No. 06-25 N.S. establishing an urgency ordinance regarding Keller Beach Sanitary Sewer Moratorium; and WHEREAS, the City approved and adopted Ordinance No. 10-25 N.S, pursuant to Government Code Section 65858, extending the existing moratorium (22 months and 15 days) on the issuance of building permits requiring a new sewer connection to the Keller Beach Sanitary Sewer (KBSS) and declaring the urgency thereof pursuant to Government Code Section 65858; and
WHEREAS, the Keller Beach Sanitary Sewer (KBSS) Moratorium was enacted due to limited sanitary sewer capacity and infrastructure constraints, restricting the issuance of new sewer connections to protect public health and prevent overloading of the existing wastewater system; and
WHEREAS, as a result of the KBSS Moratorium, certain properties within the affected area are unable to connect to the City’s sanitary sewer system, thereby constraining development, redevelopment, and continued lawful occupancy; and WHEREAS, temporary sewage holding tanks are an accepted interim wastewater management solution when permanent sewer service is unavailable, provided such systems 2841
Ord. No. XX-XX N.S.
DocID #71289v1
are properly designed, installed, operated, and monitored to protect public health and the environment; and
WHEREAS, the City currently does not have adopted construction standards or a formal permitting framework governing the use of temporary sewage holding tanks in areas subject to sanitary sewer connection restrictions, including the Keller Beach area; and WHEREAS, the Public Works Department, in coordination with its consultant Watearth, has prepared the City of Richmond Temporary Sewage Holding Tank Construction Standards and the Temporary Sewage Holding Tank Permitting Process to establish clear technical criteria, performance objectives, and administrative procedures for the temporary use of sewage holding tanks; and
WHEREAS, although the immediate need for these standards is driven by the Keller Beach Sanitary Sewer Moratorium, similar sanitary sewer capacity constraints, emergency conditions, or infrastructure limitations may arise in other areas of the City; and WHEREAS, adoption of uniform standards and a permitting process applicable citywide will ensure consistent, transparent, and defensible regulation of temporary sewage holding tanks while preserving the City’s authority to require ultimate connection to permanent sewer infrastructure when available; and
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF RICHMOND does ordain as follows based on the following findings and determinations:
SECTION 1. Findings and Determinations.
A. The regulation of temporary sewage holding tank systems is necessary to protect the public health, safety, and welfare of the residents of the City of Richmond.
B. Due to limited sanitary sewer capacity, including but not limited to the Keller Beach Sanitary Sewer Moratorium, certain properties are unable to connect to the City’s sanitary sewer system, constraining lawful occupancy and development.
C. In the absence of permanent sewer service, temporary sewage holding tank systems may provide an interim wastewater solution; however, such systems must be properly designed, installed, operated, and maintained to prevent risks to public health and the environment.
D. The establishment of uniform construction standards and a permitting process for temporary sewage holding tank systems ensures consistent, transparent, and enforceable regulation throughout the City.
E. Adoption of this ordinance will allow the City to effectively manage interim wastewater solutions while preserving the City’s authority to require connection to permanent sewer infrastructure when available.
F. This ordinance is not subject to the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines Section 15061(b)(3), in that it can be seen with certainty that there is no possibility that the activity in question will have a significant effect on the environment because the ordinance establishes regulatory standards and does not authorize or approve any specific development project unless the requirements are met and approved through the permitting process.
SECTION 2: Amendment of Article XII. Article XII of the Richmond Municipal Code is hereby amended by amending Chapter 12.19 to read as follows:
2842
Ord. No. XX-XX N.S.
DocID #71289v1
Chapter 12.19
ONSITE WASTEWATER TREATMENT SYSTEMS
Sections:
12.19.010 Designation of County of Contra Costa as Enforcement Agency.
12.19.010.1 Designation of City of Richmond as Enforcement Agency of Temporary Sewage Holding Tank Systems.
12.19.020 Adoption of Contra Costa County Sewage Collection and Disposal Ordinance.
12.19.030 Adoption of Contra Costa County Health Officer Regulations for Sewage Collection and Disposal.
12.19.040 Temporary Sewage Holding Tank Systems.
12.19.040.1 Purpose and policy.
12.19.040.2 Authority.
12.19.040.3 Standards.
12.19.040.4 Permits required
12.19.040.5 Operational requirements.
12.19.040.6 Abandonment
12.19.040.7 Enforcement.
12.19.040.8 Indemnification.
12.19.040.9 Emergency authority.
12.19.040.10 Fees and security.
12.19.010 - Designation of County of Contra Costa as enforcement agency.
The City of Richmond recognizes, and hereby designates, the County of Contra Costa as the local agency responsible for the enforcement of requirements and prohibitions pertaining to onsite wastewater treatment systems. As such, the ordinance and regulations of the County of Contra Costa pertaining to onsite wastewater treatment systems shall be obeyed by all persons with the City of Richmond. Violation of the ordinance of the County of Contra Costa pertaining to onsite wastewater treatment systems, or any lawful rule or regulation adopted pursuant thereto, will be enforced by the County of Contra Costa in accordance with the provisions of Contra Costa County Ordinance No. 2018-25, and any amendments thereto.
12.19.010.1 - Designation of City of Richmond as Enforcement Agency of Temporary Sewage Holding Tank Systems.
Notwithstanding the foregoing Section 12.19.010, the City shall be the sole authority having jurisdiction for the permitting, approval, inspection, enforcement, and administration of Temporary Sewage Holding Tank Systems. Contra Costa County shall not serve as the primary permitting or enforcement agency for such systems within the City.
2843
Ord. No. XX-XX N.S.
DocID #71289v1
12.19.020 - Adoption of Contra Costa County Sewage Collection and Disposal Ordinance.
The Board of Supervisors of the County of Contra Costa, an agency of the State of California within the meaning of Government Code Section 50022.1, has adopted County Ordinance No. 2018-25 being a codification of provisions for the regulation of onsite wastewater treatment systems, and it is a code with the meaning of Government Code Section 50022.2. Certified copies of the above-referenced County ordinance are and have been on file with the City Clerk where they are open to public inspections as required by Government Code Section 50022.3. The County ordinance may also be referred to as the Sewage Collection and Disposal Ordinance and said ordinance is referred to and adopted by this reference as part of this City ordinance, as provided for by Government Code Section 50022.2.
12.19.030 - Adoption of Contra Costa County Health Officer Regulations for Sewage Collection and Disposal.
The Board of Supervisors of the County of Contra Costa, an agency of the State of California within the meaning of Government Code Section 50022.1, has adopted "Health Officer Regulations for Sewage Collection and Disposal". Certified copies of the abovereferenced County regulations are and have been on file with the City Clerk where they are open to public inspections as required by Government Code Section 50022.3. The County regulations may also be referred to as the Sewage Collection and Disposal Regulations and said regulations are referred to and adopted by this reference as part of this City ordinance, as provided for by Government Code Section 50022.2.
12.19.040 - Temporary Sewage Holding Tank Systems.
12.19.040.1 - Purpose and policy.
To allow interim wastewater solutions where sewer connections are unavailable, including areas subject to moratoria.
12.19.040.2 - Authority.
Except as otherwise provided herein, the Public Works Director shall administer, implement, and enforce the provisions of this Section 12.19.040. Any powers granted to or duties imposed upon the Public Works Director may be delegated by the Public Works Director to a duly authorized City employee.
12.19.040.3 - Standards.
The City of Richmond Temporary Sewage Holding Tank Construction Standards and Permitting Process are incorporated by reference.
12.19.040.4 - Permits required
Construction and operational permits shall be required. The City of Richmond Temporary Sewage Holding Tank Construction Standards and Permitting Process are incorporated by reference.
12.19.040.5 - Operational requirements.
Systems shall be maintained, monitored, and serviced by licensed haulers.
12.19.040.6 - Abandonment
Temporary Sewage Holding Tank Systems shall be removed or abandoned when permanent sewer service becomes available.
12.19.040.7 - Enforcement.
Violations shall be subject to penalties, permit revocation, and cost recovery. 2844
Ord. No. XX-XX N.S.
DocID #71289v1
12.19.040.8 - Indemnification.
Permit holders shall indemnify and hold harmless the City and its agents.
12.19.040.9 - Emergency authority.
The City may take immediate corrective action to protect public health.
12.19.040.10 - Fees and security
In order to recover from users the cost of implementing the Temporary Sewage Holding Tank systems established in this chapter, the City Council shall adopt, by resolution, fees and charges, which may include:
A. Fees for monitoring, inspections, and surveillance procedures; B. Fees for permit applications;
C. Fees for filing appeals;
D. All fees, charges, and penalties, are due by the property owner; E. Other fees as the City may deem necessary to carry out the requirements contained in this chapter.
SECTION 3: Any provisions of the Richmond Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 4: Severability. If any section, subsection, paragraph, sentence, clause or phrase of this Ordinance is for any reason held by a court of competent jurisdiction to be unconstitutional or invalid, the remaining portions of this Ordinance shall remain in full force and effect. The City Council hereby declares that it would have passed each section, subsection, paragraph, sentence, clause or phrase of this Ordinance irrespective of the unconstitutionality or invalidity of any section, subsection, paragraph, sentence, clause or phrase.
SECTION 5: Effective Date. All applications filed after or pending upon the date of final passage and adoption of this Ordinance shall be subject to this Ordinance. This Ordinance becomes effective thirty (30) days after its final passage and adoption. ------------------------------------------------------
2845
Ord. No. XX-XX N.S.
DocID #71289v1
First introduced at a regular meeting of the CityCouncil of the City of Richmond held on _______, 2026, and finally passed and adopted at a regular meeting held on _________, 2026, by the following vote:
AYES: Councilmembers Bana, Brown, Jimenez, Wilson, Zepeda, Vice Mayor Robinson, and Mayor Martinez.
NOES: None.
ABSTENTIONS: None.
ABSENT: None.
PAMELA CHRISTIAN
CLERK OF THE CITY OF RICHMOND
(SEAL)
Approved:
EDUARDO MARTINEZ
Mayor
Approved as to form:
SHANNON MOORE
Interim City Attorney
State of California }
County of Contra Costa :ss.
City of Richmond }
I certify that the foregoing is a true copy of Ordinance No. XX-26 N.S., passed and adopted by the City Council of the City of Richmond at a regular meeting held on June 16, 2026.
Pamela Christian, Clerk of the City of Richmond
2846
Chapter 12.19
ONSITE WASTEWATER TREATMENT SYSTEMS
Sections:
12.19.010 Designation of County of Contra Costa as Enforcement Agency.
12.19.010.1 Designation of City of Richmond as Enforcement Agency of Temporary Sewage Holding Tank Systems.
12.19.020 Adoption of Contra Costa County Sewage Collection and Disposal Ordinance.
12.19.030 Adoption of Contra Costa County Health Officer Regulations for Sewage Collection and Disposal.
12.19.040 Temporary Sewage Holding Tank Systems.
12.19.040.1 Purpose and policy.
12.19.040.2 Authority.
12.19.040.3 Standards.
12.19.040.4 Permits required
12.19.040.5 Operational requirements.
12.19.040.6 Abandonment
12.19.040.7 Enforcement.
12.19.040.8 Indemnification.
12.19.040.9 Emergency authority.
12.19.040.10 Fees and security.
12.19.010 - Designation of County of Contra Costa as enforcement agency.
The City of Richmond recognizes, and hereby designates, the County of Contra Costa as the local agency responsible for the enforcement of requirements and prohibitions pertaining to onsite wastewater treatment systems. As such, the ordinance and regulations of the County of Contra Costa pertaining to onsite wastewater treatment systems shall be obeyed by all persons with the City of Richmond. Violation of the ordinance of the County of Contra Costa pertaining to onsite wastewater treatment systems, or any lawful rule or regulation adopted pursuant thereto, will be enforced by the County of Contra Costa in accordance with the provisions of Contra Costa County Ordinance No. 2018-25, and any amendments thereto.
(Ord. No. 09-19 N.S., § I, 6-25-2019)
12.19.010.1 - Designation of City of Richmond as Enforcement Agency of Temporary Sewage Holding Tank Systems.
Notwithstanding the foregoing Section 12.19.010, the City shall be the sole authority having jurisdiction for the permitting, approval, inspection, enforcement, and administration of Temporary Sewage Holding Tank Systems. Contra Costa County shall 2847
not serve as the primary permitting or enforcement agency for such systems within the City.
12.19.020 - Adoption of Contra Costa County Sewage Collection and Disposal Ordinance.
The Board of Supervisors of the County of Contra Costa, an agency of the State of California within the meaning of Government Code Section 50022.1, has adopted County Ordinance No. 2018-25 being a codification of provisions for the regulation of onsite wastewater treatment systems, and it is a code with the meaning of Government Code Section 50022.2. Certified copies of the above-referenced County ordinance are and have been on file with the City Clerk where they are open to public inspections as required by Government Code Section 50022.3. The County ordinance may also be referred to as the Sewage Collection and Disposal Ordinance and said ordinance is referred to and adopted by this reference as part of this City ordinance, as provided for by Government Code Section 50022.2.
(Ord. No. 09-19 N.S., § I, 6-25-2019)
12.19.030 - Adoption of Contra Costa County Health Officer Regulations for Sewage Collection and Disposal.
The Board of Supervisors of the County of Contra Costa, an agency of the State of California within the meaning of Government Code Section 50022.1, has adopted "Health Officer Regulations for Sewage Collection and Disposal". Certified copies of the abovereferenced County regulations are and have been on file with the City Clerk where they are open to public inspections as required by Government Code Section 50022.3. The County regulations may also be referred to as the Sewage Collection and Disposal Regulations and said regulations are referred to and adopted by this reference as part of this City ordinance, as provided for by Government Code Section 50022.2. (Ord. No. 09-19 N.S., § I, 6-25-2019)
12.19.040 - Temporary Sewage Holding Tank Systems.
12.19.040.1 - Purpose and policy.
To allow interim wastewater solutions where sewer connections are unavailable, including areas subject to moratoria.
12.19.040.2 - Authority.
Except as otherwise provided herein, the Public Works Director shall administer, implement, and enforce the provisions of this Section 12.19.040. Any powers granted to or duties imposed upon the Public Works Director may be delegated by the Public Works Director to a duly authorized City employee.
12.19.040.3 - Standards.
The City of Richmond Temporary Sewage Holding Tank Construction Standards and Permitting Process are incorporated by reference.
12.19.040.4 - Permits required
Construction and operational permits shall be required. The City of Richmond Temporary Sewage Holding Tank Construction Standards and Permitting Process are incorporated by reference.
12.19.040.5 - Operational requirements.
Systems shall be maintained, monitored, and serviced by licensed haulers. 2848
12.19.040.6 - Abandonment
Temporary Sewage Holding Tank Systems shall be removed or abandoned when permanent sewer service becomes available.
12.19.040.7 - Enforcement.
Violations shall be subject to penalties, permit revocation, and cost recovery.
12.19.040.8 - Indemnification.
Permit holders shall indemnify and hold harmless the City and its agents.
12.19.040.9 - Emergency authority.
The City may take immediate corrective action to protect public health.
12.19.040.10 - Fees and security
In order to recover from users the cost of implementing the Temporary Sewage Holding Tank systems established in this chapter, the City Council shall adopt, by resolution, fees and charges, which may include:
A. Fees for monitoring, inspections, and surveillance procedures; B. Fees for permit applications;
C. Fees for filing appeals;
D. All fees, charges, and penalties, are due by the property owner; E. Other fees as the City may deem necessary to carry out the requirements contained in this chapter.
2849
City of Richmond: Temporary Sewage
Holding Tank Standards
City of Richmond
450 Civic Center Plaza
Richmond, CA 94804
Contact Watearth Principal
Jennifer J. Walker PE, DWRE, ENV SP, CFM, QSD, LEED AP BD+C 1151 Harbor Bay Parkway Suite 208H
Alameda, CA 94502
510.529.5552
[email protected]
March 13, 2026
2850
Temporary Sewage Holding Tank
City of Richmond
i
Table of Contents
Table of Contents ......................................................................................................................................... i Tables .......................................................................................................................................................... iii Figures ......................................................................................................................................................... iii Appendices ................................................................................................................................................ iii Acronyms and Abbreviations .................................................................................................................. iii Definition of Terms ...................................................................................................................................... iv
1.0 Introduction ........................................................................................................................................... 1
1.1 Authority and Adoption ................................................................................................................... 2
1.2 Performance Objectives .................................................................................................................. 3
2.0 Site and Setback Requirements .......................................................................................................... 3
2.1 General Requirements ..................................................................................................................... 3
2.2 Site and Setback for Below-ground Sewage Holding Tanks ........................................................ 4
2.2.1 Groundwater and Buoyancy Control ...................................................................................... 5
2.2.2 Soil Suitability ............................................................................................................................... 5
2.2.3 Soil Considerations...................................................................................................................... 6
2.2.4 Load Considerations .................................................................................................................. 6
2.2.5 Setback Adjustments ................................................................................................................. 6
2.3 Site and Setback for Above-ground Sewage Holding Tanks ...................................................... 6
2.3.1 Stability and Anchoring ............................................................................................................. 6
2.3.2 Secondary Containment ........................................................................................................... 6
2.3.3 Access and Maintenance ........................................................................................................ 7
2.3.4 Screening ..................................................................................................................................... 7
2.3.5 Setback Considerations ............................................................................................................. 7
2.3.6 Flood Zone Restrictions .............................................................................................................. 7
2.4 Site and Setback for Coastal Areas ................................................................................................ 8
3.0 Design Requirements............................................................................................................................ 8
3.1 Sewage Holding Tank Sizing ............................................................................................................ 8
3.2 Materials ............................................................................................................................................. 9
3.3 Alarms ............................................................................................................................................... 11
3.4 Plumbing and Piping ....................................................................................................................... 12 2851
Temporary Sewage Holding Tank
City of Richmond
ii
3.5 Access .............................................................................................................................................. 14
3.6 Termination Fittings .......................................................................................................................... 14
3.7 Buoyancy ......................................................................................................................................... 14
4.0 Installation Procedures ....................................................................................................................... 15
4.1 Installation ........................................................................................................................................ 15
4.2 Inspection ......................................................................................................................................... 15
5.0 Operation and Maintenance Process .............................................................................................. 16
5.1 Odor Control .................................................................................................................................... 16
5.2 Good Workplace and Residential Practices ............................................................................... 16
5.3 Disposal Methods ............................................................................................................................ 17
6.0 Notification Requirements ................................................................................................................. 17
6.1 Pre-Installation Notification ............................................................................................................ 17
6.2 Operational Notification ................................................................................................................ 18
6.3 Emergency Notification.................................................................................................................. 18
6.4 System Modification or Abandonment ........................................................................................ 18
7.0 Abandonment Plan ............................................................................................................................ 18
7.1 Removal and Off-Site Disposal of Sewage Holding Tank and Contents.................................. 19
7.2 On-Site Abandonment of Sewage Holding Tanks ...................................................................... 19
7.3 Abandonment Duration and Requirements ................................................................................ 19
8.0 Transition Plan for Ultimate Sewer Solution....................................................................................... 20
8.1 Applicability ..................................................................................................................................... 20
8.2 Notice of Sewer Availability ........................................................................................................... 20
8.3 Connection Requirements ............................................................................................................. 20
8.4 Abandonment and Site Restoration ............................................................................................. 20
8.5 Documentation and Verification .............................................................................................. 21
8.6 Failure to Transition ...................................................................................................................... 21
8.7 Special Circumstances ................................................................................................................... 21 References ................................................................................................................................................. 22 2852
Temporary Sewage Holding Tank
City of Richmond
iii
Tables
Table 1: Minimum Setback to Sewage Holding Tanks ........................................................................... 4 Table 2: Materials Selection and Installation Scenarios ......................................................................... 9 Figures
Figure 1: Schematic Example of a Sewage Holding Tank System ........................................................ 1 Figure 2: Sewage Holding Tank ................................................................................................................. 2 Figure 3: An Example of a Fiberglass Sewage Holding Tank with an Anchoring System .................. 5 Figure 4: An Example of an Above-ground Sewage Holding Tank with a Second Containment .... 7 Figure 5: Sample Illustration of an Above-ground Polyethylene Sewage Holding Tank ................. 11 Figure 6: Sample Illustration of a Precast Sewage Holding Tank Located Below-ground ............... 11 Figure 7: Sample Illustration of an Alarm ............................................................................................... 12 Figure 8: Sample Illustration of an Alarm Setup .................................................................................... 12 Appendices
Appendix A – Keller Beach Sanitary Sewer (KBSS) Moratorium Area Appendix B – Safe Harbor Minimum Requirements
Appendix C – Basic Maintenance Checklist for Household Sewage Holding Tanks Appendix D – Spill Response and Reporting Guideline
Appendix E – Landslide Potential Map
Appendix F – Liquefaction Potential Map
Acronyms and Abbreviations
Acronym/Abbreviation Full Form
ACI American Concrete Institute
ASCE American Society of Civil Engineers
2853
Temporary Sewage Holding Tank
City of Richmond
iv
Acronym/Abbreviation Full Form
ASSE American Society of Safety Engineers
ASTM American Society for Testing and Materials
BFE Base (100-year) Flood Elevation
CBC California Building Code
DEP Department of Environmental Protection
FEMA Federal Emergency Management Agency
ft feet
GRP Glass-fiber-reinforced Polyester
IAPMO International Association of Plumbing and Mechanical Officials IPC International Plumbing Code
IPSDC International Private Sewage Disposal Code
KBSS Keller Beach Sanitary Sewer
NOAA National Oceanic and Atmospheric Administration
PVC Polyvinyl Chloride
Definition of Terms
Abandon – To remove liquid waste from and either excavate or otherwise render inoperable a sewage holding tank.
Adjacent Cutback – A nearby steep slope that may impact site stability or water quality.
Building Line – A line running parallel to a lot line that is the required setback distance from the lot line as the closest portion of a building on the site. This setback may vary depending on the front, back and side of the building.
Buoyancy – The ability to float in water.
Buoyancy Related Movement – Buoyancy related movement is the opposite of settlement. Tanks or structures can float out of the ground when groundwater applies an upward buoyant force that causes the tank or structure to move upward. These conditions shall be considered during the design process. This condition shall be considered during the design process.
Cast-in Place Concrete – Refers to concrete placed directly on a construction site using formwork instead of precast concrete.
2854
Temporary Sewage Holding Tank
City of Richmond
v
Certificate of Lateral Compliance – The certificate will be issued after a sewer lateral has been satisfactorily tested, without repair, or repaired and/or replaced.
City – City of Richmond, California.
Escarpment – A steep slope or long cliff formed by erosion or faulting, separating two relatively level or gently sloping surfaces.
Fill Bank – An artificially created slope or embankment formed by the placement of fill material, typically constructed to raise the elevation of the ground for roads, building sites, or infrastructure, and characterized by an abrupt or engineered slope face.
High Water Mark – The shore location reached by the sea at high tide, or by a lake or river at its highest water elevation.
HS-20 Loading – This is the term used by American Concrete Institute to describe normal moving traffic loading conditions up to 18-wheeler loading.
Keller Beach Sanitary Sewer Moratorium – The Urgency Ordinance No. 01-22 imposed an immediate 45-day moratorium on the issuance of building permits for certain development of activities requiring new connections to the KBSS in order for the City to evaluate remediation options and development alternatives in lieu of connection to the KBSS.
Landward – Facing toward land as opposed to facing San Francisco Bay.
Lateral - The "Lateral”, “building sewer”, or “service lateral” is the sewer pipeline conveying wastewater from the premises of a user to the City’s sewer system.
Maintenance Hole – A structural opening at the top of each sewage holding tank compartment that allows access for cleaning, inspection, and maintenance activities. The maintenance hole shall be sized to match the minimum riser diameter and serves as the connection point for the access riser and shall include sealing mechanisms to ensure a gastight and watertight seal.
Manifest System - Designed to track sewage waste from the time it leaves the generator facility or residence where it was produced until it reaches the off-site waste management facility that will store, treat, or dispose of it. It provides a detailed record of the items being transported, including their contents, destination, and handling instructions.
Moratorium – Delay in performing an obligation or taking an action legally authorized or simply agreed to be temporary.
Natural Bluff – An undisturbed geological feature with a steep slope, typically adjacent to a water body or valley, formed through natural erosional processes.
Onsite Wastewater Treatment System – A sewage treatment and disposal system that includes a septic tank and disposal field, serves one or more structures on only one lot, and is projected to receive a sewage flow of 10,000 gallons or less per day.
Peak Daily Sewage Flow – The maximum volume of sewage that a sewage disposal system is projected to receive in a 24-hour period.
Pre-Cast Concrete – Cast offsite and then brought to a construction site to be assembled.
Qualified Professional – A civil engineer, environmental health specialist, geologist, professional soil scientist, or engineering geologist, who is licensed, registered or certified by the State of California.
Riser – A riser is a vertical pipe or extension that connects the top of a sewage holding tank to the ground surface or access point, allowing for inspection, maintenance, or pumping. 2855
Temporary Sewage Holding Tank
City of Richmond
vi
Sanitary Sewer – A wastewater collection system, owned and operated by a public agency with legal authority to collect wastewater from structures within the geographical area controlled by the public agency.
Secondary Containment – Secondary containment is a control measure, placed or built around a tank, to prevent its contents, such as leaks or spills, from leaving the area.
Septic Tank – A watertight receptacle designed and constructed to receive and partially treat sewage from buildings or structures.
Settlement – Occurs when a tank or structure lowers in elevation into the ground because the foundation was not adequately compacted to support the weight of the tank or structure. The quality of compaction and the amount of settlement are determined by a geotechnical engineer based on evaluation of the types of soils present onsite and the soil compaction specified for the tank or structure foundation. This condition shall be considered during the design process.
Professional Septic Tank Cleaner – A professional engaged in the business of cleaning septic tanks, sewage holding tanks, onsite wastewater treatment systems, privies, scenarios, or seepage pits.
Sewage – Liquid waste that contains or may be contaminated with human or animal excrement or offal.
Sewage Holding Tank – An alternative to a conventional onsite wastewater treatment system. It is a sewage collection system that includes a watertight tank designed to collect and temporarily store sewage that is periodically removed by a permitted Professional Septic Tank Cleaner.
Sewage Sludge Hauler – A person who pumps or moves sewage sludge off-site by means of landbased vehicles, barges, ships, rails, pipelines, or other modes of transportation.
Termination Fitting – In sewage holding tank systems, termination fittings are the critical plumbing components located at the ends of vent, drain, and service lines that provide sealed, functional connections between the sewage holding tank and external piping systems.
Trap Arm – The horizontal section of the pipe between a plumbing fixture’s trap and the point where it connects to the main vent or drain.
Wastewater – Liquid waste, including but not limited to sewage.
Watertight – Tight construction or fit as to be impermeable to water.
Vent – A pipe or opening used for ensuring the circulation of air in a plumbing system and for reducing the pressure exerted on trap seals.
2856
Temporary Sewage Holding Tank
City of Richmond
1 1.0 Introduction
The purpose of this document is to establish standards and procedures for the temporary use of sewage holding tanks in areas of the City of Richmond that are affected by sanitary sewer connection moratoriums. These standards are intended to address immediate infrastructure limitations, particularly in the Keller Beach Sanitary Sewer (KBSS) moratorium area, while enabling controlled development and safeguarding public health and environmental quality. The KBSS moratorium area is shown in Appendix A.
Although the initial application of these standards is focused on the KBSS area, the provisions outlined in this document are designed to be adaptable and enforceable in any future moratorium zones citywide. They are also applicable in areas not under the moratorium, but where implementation may still be necessary, such as for emergency backups.
Temporary sewage holding tanks serve as interim sewage containment systems where conventional sewer service is currently unavailable. These systems must be designed, installed, and maintained per the criteria outlined in this document to prevent public health hazards, groundwater contamination, nuisance conditions, and structural failures. A schematic example of a sewage holding tank system is shown in Figure 1. A sewage holding tank example is shown in Figure 2.
This document provides comprehensive technical requirements for the setback, design, installation, operation, maintenance, and eventual decommissioning of temporary sewage holding tanks. This document also includes guidance on permitting, stakeholder responsibilities, and procedures for transitioning properties to permanent sewer infrastructure as it becomes available.
The sewage holding tank standards are to be applied in coordination with applicable local ordinances, state health and safety codes, and relevant engineering best practices. The City of Richmond will coordinate with Contra Costa County, as appropriate, to ensure consistency with County septic and onsite wastewater regulations; however, temporary sewage holding tanks governed by these Standards are reviewed and approved by the City under Municipal Code Chapter 12.19, “Onsite Wastewater Treatment Systems”.
Figure 1: Schematic Example of a Sewage Holding Tank System 2857
Temporary Sewage Holding Tank
City of Richmond
2 Figure 2: Sewage Holding Tank
1.1 Authority and Adoption
These Temporary Sewage Holding Tank Standards are adopted by the City Council of the City of Richmond under Municipal Code Chapter 12.19, ‘Onsite Wastewater Treatment Systems’. These standards are performance-based and are intended to protect public health and the environment. They also provide a temporary wastewater management option where sanitary sewer service is unavailable due to a moratorium or other constraint.
The City of Richmond is the authority having jurisdiction for the review and approval of temporary sewage holding tank systems under these Standards. In exercising this authority, the City will apply the Contra Costa County Health Officer Regulations for Sewage Collection and Disposal (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018) and other applicable state requirements.
The City, not Contra Costa County, is the reviewing and permitting agency for temporary sewage holding tanks regulated under Chapter 12.19.
Compliance with these standards is determined by demonstrated achievement of performance outcomes, including protection of public health, prevention of environmental impacts, and reliable system operation. At a minimum, the system must operate without overflows, nuisance odors, or groundwater contamination. The system must also support a timely and verifiable transition to a permanent sanitary sewer connection when service becomes available.
Compliance is demonstrated through documented operation, maintenance, and inspections, including required pumping notices and manifest records for collection, transport, and disposal at an approved facility. Compliance is also demonstrated through submittals confirming sewer connection and holding tank abandonment within the required compliance period. 2858
Temporary Sewage Holding Tank
City of Richmond
3 Prescriptive criteria in these Standards (including but not limited to setbacks, sizing formulas, material requirements, alarm provisions, and default pumping frequencies) are deemed-tocomply “Safe Harbor” provisions. Applicants may use these provisions without additional technical justification. Alternative designs may be approved where the applicant demonstrates equal or better performance to the satisfaction of the City.
This document includes several safe harbor provisions. These include the minimum requirements in Table 1, materials selection criteria in Table 2, sewage holding tank sizing formulas in Section
3.1, and pumping frequency provisions in Section 5.3. A sample Safe Harbor (Deemed-toComply) applicant checklist is included in Appendix B.
1.2 Performance Objectives
The objectives of these Standards are to:
1. Prevent discharge of sewage to the ground surface, storm drains, surface waters, or the City’s stormwater system.
2. Prevent contamination of groundwater, public drinking water wells, and other potable water supplies.
3. Avoid structural failure, settlement, or buoyancy-related movement of sewage holding tanks and associated appurtenances.
4. Prevent public health nuisances, including sewage backups into occupied structures and objectionable odors at property boundaries and public right-of-way.
5. Prevent standing sewage and unsanitary conditions onsite.
6. Provide overfill prevention through alarms and operational controls sufficient to give warning before the tank reaches full capacity.
7. Ensure that temporary sewage holding tanks can be safely and promptly decommissioned, and that structures are transitioned to permanent sewer service or other approved onsite wastewater treatment systems when available.
The City may approve alternative methods, materials, or designs when a qualified professional demonstrates, through calculations, manufacturer data, monitoring, or other evidence, that the proposed system will meet or exceed these performance objectives.
2.0 Site and Setback Requirements
The listed criteria are presumptively acceptable designs for site and setback compliance.
Alternatives may be approved by the City if the applicant demonstrates equal or better performance (e.g., through calculations, monitoring, or manufacturer data).
This section details the mandatory setback distances between sewage holding tanks and various site features. These requirements ensure that installations are properly positioned to protect public health, water resources, and infrastructure. Below-ground sewage holding tanks need proper groundwater clearance and suitable setbacks, especially in unstable soils. Aboveground sewage holding tanks require secure anchoring, secondary containment, and clear access. In flood or coastal zones, sewage holding tanks must be designed to withstand wave impact, erosion, and storm conditions. The site and setback requirements apply to all temporary sewage holding tank installations citywide, with immediate application in the KBSS moratorium area.
2.1 General Requirements
Minimum setback rules for sewage holding tank installations are detailed in Table 1 (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for 2859
Temporary Sewage Holding Tank
City of Richmond
4 Sewage Collection and Disposal, 2018). Where compliance with minimum setbacks is not feasible due to site constraints, an alternative site and setback plan must be submitted by a registered professional engineer in California and approved by the City of Richmond under Chapter 12.19.040, in a manner consistent with Contra Costa County Health Officer Regulations for Sewage Collection and Disposal. If applicable, for properties with temporary sewage holding tanks that were legally installed prior to these regulations being adopted that may not be in full compliance, owners should still follow the minimum setback as closely as feasible.
Table 1: Minimum Setback to Sewage Holding Tanks
Site Feature Setback to
Sewage
Holding
Tanks (feet)
High water marks of bays, streams, rivers, canals 100
High water marks of ditches, culverts, ephemeral streams 50 High water marks of lakes, reservoirs 100
Depressions and low areas 5
Downslope or adjacent cutbanks, fill banks, escarpments, embankments, natural bluffs
10 Fill areas, unstable soil, unstable landforms, drainage swales 10 Trees 10
Structures, foundations 10
Underground irrigation or drainage systems (watertight piping) 10 Underground irrigation or drainage systems (non-watertight piping) 100 Easements 5
Public drinking water well 100
Pressurized water supply line 10
If the ground is rocky and fissures could take the outflow further, it should be greater than the nearest water supply siting
>50
2.2 Site and Setback for Below-ground Sewage
Holding Tanks
Below-ground sewage holding tanks must be sited and constructed in a manner that protects public health, water quality, and structural integrity. Below-ground sewage holding tanks have 2860
Temporary Sewage Holding Tank
City of Richmond
5 different structural, geotechnical, and hydrology considerations. Installations shall comply with the following requirements:
2.2.1 Groundwater and Buoyancy Control
1. Sewage holding tanks must maintain a minimum vertical clearance of two feet above the seasonal high groundwater table unless engineered buoyancy countermeasures are provided (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
It is also important to follow all sewage holding tank manufacturers’ recommendations related to buoyancy.
2. Where groundwater is present within five feet of the excavation bottom, sewage holding tanks shall be installed with anti-floatation slabs or other engineered anchoring systems to resist buoyant uplift. An example of an anchoring system is shown in Figure 3.
Figure 3: An Example of a Fiberglass Sewage Holding Tank with an Anchoring System
2.2.2 Soil Suitability
1. A geotechnical evaluation is required if the site contains expansive soils, unstable landforms, or is located in a designated landslide or liquefaction zone. In addition, a geotechnical evaluation may also be required by the Building Division for other conditions, as specified in California Building Code (CBC) 1803.5. As an additional document, the Landslide Potential Map is located in Appendix E, while the Liquefaction Potential Map is located in Appendix F.
2. Excavation and backfill must use materials and compaction methods per the sewage holding tank manufacturer’s specifications and geotechnical recommendations.
2861
Temporary Sewage Holding Tank
City of Richmond
6 2.2.3 Soil Considerations
1. Design considerations should take into account the type of soil and subsoil. A minimum of 15 inches of soil cover must be placed on top of the sewage holding tank, but not sufficient alone under traffic loading. The top layer of the soil cover must be level with the natural grade.
2.2.4 Load Considerations
1. Below-ground sewage holding tanks located under driveways, parking areas, or other vehicular access points must be designed to withstand HS-20 loading or greater as required by site use.
2. Installations under structures or hardscape features are prohibited unless specifically engineered and approved by the City of Richmond, consistent with applicable Contra Costa County Health Officer regulations.
2.2.5 Setback Adjustments
1. The standard setbacks in Table 1 apply. However, where slope stability or groundwater conditions warrant, the City may increase setback requirements or require additional analysis.
2.3 Site and Setback for Above-ground Sewage
Holding Tanks
Above-ground sewage holding tanks present setback challenges related to visibility, access, containment, and safety. Above-ground sewage holding tanks shall comply with the following site and setback requirements:
2.3.1 Stability and Anchoring
1. All above-ground sewage holding tanks shall be anchored to resist lateral loads per CBC Chapter 16 and local lateral design speeds (minimum 100 mph 3-second gust, per ASCE 7).
2. Sewage holding tanks must be placed on a level, engineered pad or concrete slab capable of supporting the full tank weight, including liquid contents.
3. All above-ground sewage holding tanks must be supported by a level, engineered foundation.
2.3.2 Secondary Containment
1. Above-ground sewage holding tanks with a capacity of over 1,000 gallons must include secondary containment equal to at least 150% of the sewage holding tank volume (California Water Boards, California Code of Regulations, Title 23, Division 3, Chapter 16, 2020).
2. Containment areas must be lined, impermeable, and resistant to sewage degradation. While concrete may be used, it must be properly coated or sealed to achieve impermeability and chemical resistance. An example of an above-ground sewage holding tank containment is shown in Figure 4.
2862
Temporary Sewage Holding Tank
City of Richmond
7 Figure 4: An Example of an Above-ground Sewage Holding Tank with a Second Containment
2.3.3 Access and Maintenance
1. Sewage holding tanks shall be located with a minimum 10-foot clear zone for vehicle access (pump trucks) and unobstructed maintenance. Where feasible, a paved or otherwise stabilized path shall be provided to support all-weather service access.
2. A safe and stable working area shall always be maintained around the sewage holding tank.
2.3.4 Screening
1. Above-ground sewage holding tanks visible from public rights-of-way or residential properties must incorporate screening measures such as fencing, vegetation, or architectural enclosures consistent with City of Richmond’s Zoning and Subdivision Regulations (City of Richmond, Zoning and Subdivision Regulations, 2025) and neighborhood aesthetic guidelines.
2. In accordance with the Screening Regulations of the City of Richmond, all mechanical equipment, including sewage holding tanks if visible from public areas, must be screened from public view. If a sewage holding tank must be installed in the front yard, it will also be subject to these screening requirements to ensure it is not visible from public view.
3. An above-ground holding tank located facing a street must be screened to a height of 12 inches above the top of the tank, unless the required screening interferes with utility access, in which case reasonable accommodation must be provided.
2.3.5 Setback Considerations
1. Above-ground sewage holding tanks shall meet all applicable setbacks per Table 1 and shall not be placed within utility easements, public sidewalks, or within 5 feet of property lines unless specifically approved.
2.3.6 Flood Zone Restrictions
1. Above-ground sewage holding tank foundations in Federal Emergency Management Agency (FEMA)-designated flood zones must be elevated 18 inches above the base elevation (BFE) or otherwise protected by the City of Richmond Floodplain Management Ordinance.
2863
Temporary Sewage Holding Tank
City of Richmond
8 2.4 Site and Setback for Coastal Areas
In areas at risk of high-velocity flooding, wave impact, erosion, or storm-related damage, a sewage holding tank must incorporate specific design measures to ensure their protection and functionality:
1. Sewage holding tanks should be oriented to resist or minimize wave impacts and moving floodwaters.
2. The narrowest dimension of the sewage holding tank should be located perpendicular to the flood flow.
3. The sewage holding tank must be located landward of the building line when possible and landward of the easement at all times to ensure it will not release contaminants in a flood and can be used after flood waters recede.
4. The system must be designed and certified by a registered professional engineer in California to withstand damage during coastal storms.
5. The engineer shall submit calculations and drawings demonstrating that the temporary sewage holding tank meets applicable FEMA coastal zone construction criteria and local floodplain management regulations.
6. The setback requirements are intended to protect wells, surface water, and slope stability to prevent release of contaminants during flooding, wave impact, erosion, and coastal storms.
7. Alternative siting is acceptable where a qualified professional demonstrates equivalent protection (e.g., liners, structural supports, and additional containment).
Alternative setbacks may be approved if standard setbacks are not feasible, provided the design is prepared by a qualified engineer and approved by the City of Richmond, consistent with applicable Contra Costa County Health Officer regulations.
3.0 Design Requirements
The listed criteria are “presumptively acceptable designs” for design and construction compliance. Alternatives may be approved by the City if the applicant demonstrates equal or better performance (e.g., through calculations, monitoring, or manufacturer data). The Design Criteria Section outlines design and construction requirements, including minimum standards that must be met to obtain the construction permit. The Design Criteria Section covers critical aspects such as sewage holding tank sizing based on the intended application, appropriate material selection depending on installation conditions, and necessary features like alarms, plumbing, access points, and termination fittings to promote system efficiency and safety.
3.1 Sewage Holding Tank Sizing
The size of the sewage holding tank depends directly on the intended application, which includes single-family residences, multi-family homes, and other types of structures and land use.
Smaller sewage holding tanks require a more frequent pumping schedule. An oversized sewage holding tank that is pumped too infrequently can lead to odors arising from stagnant sewage.
The required minimum size for sewage holding tanks varies according to the type of structure 2864
Temporary Sewage Holding Tank
City of Richmond
9 and its associated land use (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
The sizing formulas below are intended as default minimums; however, an alternative volume may be considered where project-specific information demonstrates that the proposed design will still meet alarm/overflow performance targets.
1. Residential (Single-Family): For one or two bedrooms, the minimum capacity that will serve the dwelling is 1,000 gallons.
2. Residential (Three or More Bedrooms): For three or more bedrooms, the minimum capacity is 1,000 gallons for the first two bedrooms and 250 gallons for each additional bedroom.
3. Other Structures (Other than Single-Family Residential): The minimum capacity is calculated by multiplying the peak daily sewage flow of the structure by 0.75 and adding 1,125 gallons.
3.2 Materials
This subsection explains how to select appropriate sewage holding tank materials based on installation conditions and regulatory standards. Different installation scenarios (below-ground vs. above-ground) may require different material choices from among the approved options. The following requirements are mandatory and provide guidance for appropriate material selection:
1. The sewage holding tank must be watertight.
2. The sewage holding tank must be certified by the International Association of Plumbing and Mechanical Officials (IAPMO) as per Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018.
3. If installed below-ground and exposed to traffic (e.g., under pavement or driveways), the sewage holding tank must be traffic-rated. The materials must withstand HS-20 load vehicles, as specified in Section 2.2.4 Load Considerations.
Table 2 summarizes approved sewage holding tank materials and material suitability for different installation scenarios, along with key limitations or considerations for each.
Table 2: Materials Selection and Installation Scenarios Material Below- or
Above-ground
Suitability
Advantages Limitations
Pre-cast Concrete Below-ground Typically premanufactured in controlled
environments, leading
to consistent quality
Typically assembled
on-site. Watertight
performance depends
on proper joint sealing
which can be a weak
2865
Temporary Sewage Holding Tank
City of Richmond
10 Material Below- or
Above-ground
Suitability
Advantages Limitations
point if installation is
not done correctly
Cast-in-place Concrete Below-ground Offers robust loadbearing capacity suitable for heavy
earth cover, and its
dimensions can be
tailored to site-specific
conditions
Susceptible to
chemical exposure if
not properly coated or
lined
Concrete Above-ground Suitable for largevolume storage where space permits
Concrete tanks require
a foundation designed
by a registered
professional engineer,
and need heavy
machinery for
installation, which
increases labor costs
Fiberglass Both Fiberglass is nonreactive to sewage
byproducts
Because of the lighter
weight of the material,
it may float or shift,
which can be avoided
by properly anchoring
the tank to the ground
Polyethylene Both Less expensive than
concrete or fiberglass
alternatives
Performance may be
affected in hightemperature
environments
Monolithic Concrete Both Can be engineered for
large capacities and
complex site conditions
Installation involves
significant site
preparation, formwork,
and curing time
Glass-fiber-reinforced
Polyester
Both Ideal for sewage
applications where
chemical exposure is a
concern
Glass-fiber-reinforced
Polyester (GRP) tanks
are not inherently
traffic-rated;
additional structural
reinforcement or
special installation
methods are needed
2866
Temporary Sewage Holding Tank
City of Richmond
11 Examples of a polyethylene sewage holding tank and a precast sewage holding tank, respectively, are shown in Figures 5 and 6.
Figure 5: Sample Illustration of an Above-ground Polyethylene Sewage Holding Tank Figure 6: Sample Illustration of a Precast Sewage Holding Tank Located Below-ground
3.3 Alarms
Properly functioning alarm systems are critical to the safe operation of temporary sewage holding tanks. The installed sewage holding tank must be equipped with a high-water sensing device and high-water audible and visual alarms. All alarm equipment must be located where it will not interfere with pumping, is not subject to mechanical damage, and is accessible for 2867
Temporary Sewage Holding Tank
City of Richmond
12 repairs and adjustments. Alarms should be weatherproof or placed in a protective enclosure such as a covered area or box. An example of an alarm and setup is shown in Figures 7 and 8.
1. Alarm Location: The alarm system should be attached to the structure served, either on a pipe stand, or a wooden post within five feet of the structure (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
2. Alarm Settings: The alarm system installed in each sewage holding tank will need to indicate when the sewage holding tank is approximately 75% filled.
3. Electrical Consideration: The alarm system must be installed on a separate electrical circuit. Each installation must have an electrical disconnect within sight of the sewage holding tank.
Figure 7: Sample Illustration of an Alarm
Figure 8: Sample Illustration of an Alarm Setup
3.4 Plumbing and Piping
This section outlines plumbing and piping requirements for sewage holding tank systems, including water metering, backflow prevention, overflow control, approved pipe materials, watertight connections, and provisions for gravity flow and above-ground plumbing:
2868
Temporary Sewage Holding Tank
City of Richmond
13 1. Water Meter: Any building or structure served by a sewage holding tank shall have a water meter, or meters, installed that measures all water that will be discharged as sewage from the building or structure.
2. Backflow Preventers: Backflow preventers should be installed on all sewage holding tanks to prevent backing up of sewage into the building and discharge of sewage into floodwater. Devices must be suitable for sewage conditions, including stainless steel models or those certified under ASSE 1013, or equivalent certifications designed for sewage use.
3. Overflow: Overflows must be above the base flood elevation.
4. Pipe Material: Use Schedule 40 PVC pipe and Schedule 40 PVC connection fittings for all transport lines (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
5. Plumbing Connections: Plumbing connections must be watertight.
6. Gravity Flow to Tank: Conventional plumbing requirements apply.
7. Pressure Flow to Tank: Pump activation and deactivation must be double controlled by float switches within the pump chamber and sewage holding tank. This is intended to prevent pumping excess sewage into the sewage holding tank. Exact elevations shall be determined based on tank geometry and manufacturer recommendations to ensure protection against overfill.
8. Above-ground Tank Plumbing: This configuration creates potential for physical damage to piping and tanks. Whenever piping is above-ground, it must be adequately protected from damage in accordance with the International Plumbing Code (IPC) ß 305. Where multiple, interconnected tanks are installed, connections must be connected by differential settling using a common slab designed per ACI 318, flexible connections, or engineered bedding systems.
9. Future Connection to the City’s Sanitary Sewer: When the connection to the sanitary sewer becomes available, a disconnection valve and bypass piping must be predesigned to enable transition without excavation of primary building sewer lines. The disconnection valve and bypass piping must be installed at the time the temporary sewage holding tank is installed. Pre-installation ensures a simple future connection transition process to the City's sanitary sewer (e.g. opening a valve). a. Disconnection valves must be installed downstream of the sewage holding tank outlet if gravity discharge is available (Onsite Wastewater Treatment System, California Code of Regulations, 2007). For pressurized or pumped systems, valves should be placed at a designated cleanout access point.
Additional guidelines on clean out requirements are provided in Section 708 of the IPC.
b. The plumbing layout must facilitate isolation of the sewage holding tank and rerouting of flow to the sewer. This can be achieved by installing a T-junction with a capped branch oriented toward the future sewer connection.
Additional guidelines on sanitary drainage and sewer are provided in Section 709 of the California Plumbing Code.
2869
Temporary Sewage Holding Tank
City of Richmond
14 3.5 Access
Well-designed access points are essential for the system's long-term functionality and operational efficiency. For below-ground sewage holding tanks, it is important that the sewage holding tank is accessible at ground level. Accessibility is accomplished using a catch-basin riser and access cover.
1. Access Points: Sewage holding tanks greater than 2,000 gallons must have multiple access points. Service access or pumping access ports must allow for efficient pumping of all contents.
2. Access Riser: A waterproof access riser with a gas-tight lid and seal must extend from the maintenance hole of each sewage holding tank compartment to the finished grade. The riser must be constructed of polyethylene, have a minimum diameter of 24 inches, and be of a size sufficient for the sewage holding tank maintenance hole.
Access risers must be traffic rated in areas that are surfaced by concrete, asphalt, or similar paving, or subject to vehicular traffic.
3.6 Termination Fittings
This subsection covers the connections and fittings necessary for system operation, highlighting the importance of proper ventilation, drainage, and provisions for future sewer connection.
Termination fittings are essential for proper system function. Well-designed plumbing elements prevent odor issues, support waste flow, and facilitate the eventual transition to permanent sewer service. Installers must ensure correct venting and drainage to maintain system integrity and performance.
1. The sewage holding tank shall be vented at the highest point (at the top) of the tank by one of the following methods: 1.25-inch minimum diameter individual vent pipe extending undiminished in size through the roof.
2. A wet vent may also serve as a drain line, as long as the section acting as the drain is one pipe size larger than the trap arm it serves.
3. Liquid waste holding tank drain opening shall be a minimum 1.50-inch pipe size.
4. Steel piping is not recommended due to the susceptibility to corrosion.
3.7 Buoyancy
Effective buoyancy control is crucial in the Richmond coastal environment and varies based on whether the system is below or above-ground:
1. Below-ground: The sewage holding tank must be inherently non-buoyant. A sewage holding tank is non-buoyant if installed above the groundwater elevation, weight of the empty tank exceeds buoyant forces, or “side wings” anchor the tank into surrounding soil. The sewage holding tank must be able to withstand traffic loading if the area is subject to vehicular traffic loads. One criterion would be to have a minimum of 15 inches of soil cover over the sewage holding tank to enhance stability and protection.
2870
Temporary Sewage Holding Tank
City of Richmond
15 2. Above-ground: Must be designed and constructed to function as needed and retain shape, integrity, and watertightness. The buoyancy component must provide adequate support for all associated piping.
4.0 Installation Procedures
This section provides guidelines and regulatory considerations for the installation and inspection of sewage holding tanks. This section is intended to guide stakeholders—such as contractors, inspectors, and site planners—through the correct procedures for installations. The section emphasizes proper sewage holding tank placement, testing for watertight integrity, and compliance with the City of Richmond’s inspection protocols, consistent with applicable Contra Costa County Health Officer regulations, to ensure safe and effective sewage management systems.
4.1 Installation
Sewage holding tanks must meet approved standards and be securely installed in a location to be removable for service, repair, or replacement without the necessity of removing permanent, structural, mechanical, or electrical equipment (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
Sewage holding tank installations will not be approved if the site is suitable for another type of private sewage disposal system. Installation will follow once the City of Richmond approves the construction permit, consistent with applicable Contra Costa County Health Officer regulations.
Additional details regarding the permitting process will be provided in the permit section.
1. Firm Bedding (above-ground): A sewage holding tank must be installed level on a firm bedding of compacted soil, sand, or gravel in accordance with the manufacturer’s specifications. Where sewage holding tanks are to be located on sloped terrain (greater than 5%), areas of fill, or near drainage paths, bedding must be designed by a qualified professional.
2. Pipes: All pipes that pass through a sewage holding tank must be sealed with a watertight sealant. In accordance with ASTM C923, examples of acceptable sealing methods include flexible rubber boots (commonly used for maintenance hole), or compression gaskets (commonly used to connect reinforced concrete maintenance hole or pipes) designed to maintain a seal under hydrostatic pressure.
3. Watertightness: Temporary sewage holding tanks must be demonstrated to be watertight by field testing conducted during installation in the presence of the City of Richmond representative.
4. Testing Procedure: Fill sewage holding tanks with water 2 inches into riser connections at least 24 hours prior to commencement of the test and mark water level. The test consists of a one-hour observation period. The absence of any water level drop during this period is considered a passing test. If the water level drops, the tank must be resealed and retested.
5. Cover: A utilized tank may not be covered until after the City of Richmond representative has conducted an inspection of the tank and its connections.
4.2 Inspection
The City of Richmond, consistent with applicable Contra Costa County Health Officer regulations, is responsible for inspecting various aspects of sewage systems to ensure 2871
Temporary Sewage Holding Tank
City of Richmond
16 compliance with safety and operational standards. This step is integral to the operational requirements to ensure that sewage holding tank systems meet the required health and safety standards. Additional information regarding the operational requirements will be covered in the Permit Process Section.
1. Non-buoyancy in high groundwater areas or conditions;
2. Watertightness of the sewage holding tank, tested at site after installation, by filling with water;
3. Leak-proof nature of the service access(es), access ports, risers, lids, and covers;
4. Methods to secure the lids and covers from inappropriate or unapproved access;
5. Methods of venting provided by the design and installation. Venting should exhaust above the roof line of the building;
6. Equipment and methods for cleaning sewage spills; and
7. Alarm functions.
5.0 Operation and Maintenance Process
This section addresses the ongoing requirements for maintaining a functional sewage holding tank system. The operations and maintenance process details odor control measures for both gravity and pressure flow systems, workplace practices to prevent contamination, and proper procedures for wastewater removal and disposal. These guidelines help ensure safe operation and prevent environmental contamination throughout the system's service life.
5.1 Odor Control
The process outlines the necessary measures to control odors, ensure leak-proof seals, and properly vent sewage holding tanks in both gravity and pressure flow systems:
1. All covers must be leak-proof to prevent infiltration or exfiltration of liquid or the escape of nuisance odors or hazardous gases.
2. Gravity Flow to the Sewage Holding Tank: Separate venting directly from the sewage holding tank is required since gases will not adequately vent through the pressurized line from a sewage pump. Vent pipes should terminate at a height sufficient to ensure the dispersion of odors and gases, and must be located away from windows, doors, walkways, and other areas where human activity regularly occurs.
3. Pressure Flow to the Sewage Holding Tank: Direct venting of the sewage holding tank is required since gases will not adequately vent through the pressurized line from a sewage pump. Vent pipes must terminate at a height sufficient to ensure the dispersion of odors and gases, and must be located away from windows, doors, walkways, and other areas where human activity regularly occurs.
5.2 Good Workplace and Residential Practices
Proper handling and maintenance of the sewage holding tank are crucial to prevent contamination, support emergency response, and ensure safe operations. This subsection outlines key practices such as monitoring, labeling, and employee/household user training for managing the sewage. The Basic Maintenance Checklist for Household Sewage Holding Tanks is shown in Appendix C.
2872
Temporary Sewage Holding Tank
City of Richmond
17 1. The sewage holding tank must remain closed at all times except when sewage is being added or removed.
2. Conduct and document visual inspections of the sewage holding tank and piping for leaks. Document periodic tests of the sound and visual alarms, too.
3. Label the sewage holding tank or place a sign near the access cover with the words, " Non-Hazardous Sewage". The sign serves as a reminder for employees or household users and alerts emergency first responders unfamiliar with your business or household processes and practices.
4. Train employees or household users about spill prevention and clean-up to minimize the possibility of contaminants entering the sewage holding tank.
5. In the event of a leak or spill, there should be an appropriate response measure to collect, contain and clean-up the sewage. In the event of a chemical or oil spill, report the spill to the Department of Environmental Protection (DEP), even if the material is captured in the sewage holding tank. Refer to Appendix D for the Spill Response and Reporting Guideline.
6. No hazardous waste shall be deposited in the sewage holding tank.
5.3 Disposal Methods
This section outlines the requirements and procedures for the proper pumping and disposal of wastewater from sewage holding tanks. It covers the necessary access points for efficient pumping, the frequency of tank servicing, the method of sewage removal, and the requirements for disposal of hazardous waste:
1. Temporary Sewage Holding Tanks must be pumped at least once per week, or at a frequency demonstrated by metering or records to prevent the tank from exceeding 75% of working volume between pump-outs to avoid spills, backups, or nuisance conditions.
2. Removal of sewage from holding tanks shall be accomplished in a clean and sanitary manner, by means of a vacuum hose, and shall be disposed into a leakproof tank truck. In addition, a licensed sewage sludge hauler must obtain a Richmond Business License Number. Operators are also required to obtain a permit decal for their sewage pumping vehicles. The permit decal, as required by Section 420-6.1206 of Contra Costa County Ordinance Code 420-6.606, must be displayed permanently to the rear of the sewage pumping vehicle.
6.0 Notification Requirements
The notification requirements align with the permit processes, inspection requirements, and operational standards already established in the document, while ensuring proper oversight and emergency response capabilities for the temporary sewage holding tank systems throughout the City of Richmond.
6.1 Pre-Installation Notification
For the procedure of abandoning an onsite wastewater treatment system, the property owners must provide an advanced notification to the appropriate authorities before installing a sewage holding tank system:
2873
Temporary Sewage Holding Tank
City of Richmond
18 1. City of Richmond Notification: Written notification must be submitted to the City of Richmond to schedule required inspections. Refer to the Permit Process Section for more detais about the Construction Permit.
2. Utility Notification: Coordinate with the utility companies (gas, electric, water, telecommunications) before the excavation.
6.2 Operational Notification
Ongoing notification requirements during system operation include:
1. Pumping Schedule: The licensed sewage sludge hauler must provide written notice to the property owner and City of Richmond after each pumping event. Refer to the Permit Process Section for more details about the Manifest System Process.
2. System Malfunctions: Any malfunction, leak, overflow, or failure of the sewage holding tank system must be reported immediately to the City of Richmond.
6.3 Emergency Notification
Immediate notification is required for any emergency situations:
1. Spills: Any sewage spill or release must be reported immediately to the City of Richmond.
2. System Failure: Complete system failure requiring emergency pumping or alternative arrangements must be reported within two hours to the City of Richmond.
6.4 System Modification or Abandonment
This subsection describes the notification requirements for modifying, abandoning, or converting a sewage holding tank system, including actions required when municipal sewer service becomes available.
1. Modifications: Any proposed modifications to the existing sewage holding tank system require an advance written notice to the City of Richmond. Refer to the Permit Process Section for more details about the Construction Permit Process.
2. Abandonment Notice: Property owners must provide an advance written notice before abandoning or converting a sewage holding tank system. Refer to the Permit Process Section for more details about the Abandonment Requirement.
3. Sewer Connection: When municipal sewer service becomes available, the City shall notify the affected property owners of the requirement to connect and initiate abandonment of the existing sewage holding tank system.
7.0 Abandonment Plan
This section outlines the procedures for properly decommissioning sewage holding tank systems, including both the removal and off-site disposal of the sewage holding tank and its contents, as well as the option for on-site abandonment (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018). The abandonment plan specifies the timeline requirements for system termination when connecting to permanent sewer infrastructure.
2874
Temporary Sewage Holding Tank
City of Richmond
19 7.1 Removal and Off-Site Disposal of Sewage Holding
Tank and Contents
The City recommends prioritizing the removal and proper disposal of sewage holding tank systems, particularly those installed underground, to avoid potential confusion or issues for future property owners or tenants. Abandonment procedures for sewage holding tanks, with provisions for removing and disposing of materials off-site:
1. All contents must be removed from the sewage holding tank and hauled away by a licensed sewage sludge hauler.
2. The lid of the sewage holding tank must be removed and either recycled or disposed of at a permitted solid waste facility.
3. The sewage holding tank must be excavated, removed, and disposed of at a permitted solid waste facility or abandoned in place.
4. All above-ground appurtenances, including vents, risers, and electrical alarm systems, must be removed and disposed appropriately. Vents, risers, and electrical alarms could be disposed of in a solid waste landfill approved for construction and demolition debris.
7.2 On-Site Abandonment of Sewage Holding Tanks
Guidelines for in-place abandonment of sewage holding tanks as part of the abandonment process:
1. If the sewage holding tank is abandoned in place, a sufficient number of holes must be made in the bottom of the tank to prevent accumulation of surface water in or above the tank.
2. A sewage holding tank that is abandoned in place must be filled with pea gravel, drain rock, or compacted native soil.
3. Any remaining piping and valves must be cut and capped using corrosion-resistant and watertight plugs or refer to Section 3.4 Plumbing and Piping for the details of connecting to the City’s Sanitary Sewer without excavation of primary building sewer lines.
4. All electrical systems must be de-energized at the source unless repurposed for the sewer connection.
7.3 Abandonment Duration and Requirements
1. The property owner or agent shall apply for an abandonment requirement from the City of Richmond, consistent with applicable Contra Costa County Health Officer regulations, to abandon the existing onsite sewage system. Additional details about the abandonment requirement are provided in the Permit Process Section.
2. Use of a sewage holding tank system connected to a structure must terminate upon completion of construction of a new onsite wastewater treatment system that will serve the structure.
2875
Temporary Sewage Holding Tank
City of Richmond
20 3. Use of a sewage holding tank system connected to a structure must terminate within 90 calendar days after the City of Richmond determines that connection to a sanitary sewer is available to the structure.
8.0 Transition Plan for Ultimate Sewer
Solution
This section establishes the requirements and procedures for transitioning properties utilizing temporary sewage holding tanks to a permanent sanitary sewer connection once service becomes available. This ensures an orderly and timely conversion process that minimizes service disruption, protects public health, and aligns long-term infrastructure goals for the City of Richmond.
8.1 Applicability
This transition plan applies to all properties operating under an approved temporary sewage holding tank permit in areas where a sewer moratorium is in effect and where future sewer infrastructure is planned and scheduled for construction.
8.2 Notice of Sewer Availability
When sewer service becomes available to a property:
1. The City will issue a formal written notice to the property owner identifying that a sewer connection is now possible.
2. The notice will include the connection location, construction timeline, and any applicable fees or design requirements.
3. Property owners will have a 90-day compliance period from the date of notice to initiate connection planning and abandon the sewage holding tank system.
8.3 Connection Requirements
Property owners must:
1. Hire a licensed contractor to complete the sewer connection in accordance with City design standards.
2. Obtain necessary permits for connection and abandonment of the sewage holding tank from the City of Richmond, as applicable. The permits include a Construction Permit, Operational Requirement, and Abandonment Requirement, which will be explained further in the Permit Process Section.
3. Ensure the sewage holding tank is properly decommissioned by Section 7.0 of this document.
8.4 Abandonment and Site Restoration
Once connected to the sewer:
1. The temporary sewage holding tank must be abandoned in place or removed in accordance with the abandonment guidelines.
2. Any related surface or sub-surface infrastructure (e.g., risers, vents, access points) must be removed, filled with pea gravel, drain rock or compacted native soil, or capped. 2876
Temporary Sewage Holding Tank
City of Richmond
21 3. The site must be restored to grade and re-landscaped or repaved as appropriate to match adjacent conditions.
8.5 Documentation and Verification
Upon completion of the sewer connection and sewage holding tank abandonment, the property owner must submit the following to the City:
1. A Certificate of Lateral Compliance recommended by a state licensed plumber to be approved by the City of Richmond.
2. An Abandonment Requirement application. Refer to the Permit Process Section for more details about the Abandonment Requirement.
3. As-built drawings or photographs documenting both the new connection and the decommissioned sewage holding tank.
8.6 Failure to Transition
Failure to connect to the sewer system within the 90-day period may result in:
1. Revocation of the sewage holding tank Operational Requirements.
2. Enforcement actions in accordance with the Municipal Code Chapter 12.19, “Onsite Wastewater Treatment Systems”, including violations, penalties, discontinuance of service, and/or permit revocation, as applicable.
3. Municipal Code Chapter 12.19, “Onsite Wastewater Treatment Systems” is independent but coordinated with Contra Costa County Health Officer under Contra Costa County Ord. Code ß 420-6.606, including referral to Contra Costa Health for potential citation, as appropriate.
8.7 Special Circumstances
If connection to the sewer cannot be completed within the designated timeframe due to conditions beyond the control of the property owner (e.g., access constraints, delayed construction by the City), the property owner may request a written temporary extension. All extension requests must:
1. Be submitted in writing before the original compliance deadline.
2. Include justification and a proposed schedule for compliance.
3. Be approved by the City of Richmond, consistent with applicable Contra Costa County Health Officer regulations on a case-by-case basis.
2877
Temporary Sewage Holding Tank
City of Richmond
22 References
ACI Building Code Requirements for Structural Concrete and Commentary, https://myyardimci.weebly.com/uploads/1/6/3/4/16347790/building_design_code_englis h.pdf, Accessed 6-19-2025
ASSE International, ASSE Standard #1013-2021 Reduced Pressure Principle Backflow Prevention Assemblies, https://assewebstore.com/asse-standard-1013-2021/, Accessed 6-19-2025 ASTM C923 Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals, https://store.astm.org/c0923-00.html, Accessed 6- 10-2025
Barr, GRAF Heavy-Duty Septic Holding Tanks, https://www.barrplastics.com/products/grafheavy-duty-septic-sewage-holding-tanks, Accessed 6-16-2025 California Building Standards Code, https://www.dgs.ca.gov/BSC/Codes, Accessed 6-3-2025 California Code of Regulations, Onsite Wastewater Treatment System, https://www.waterboards.ca.gov/water_issues/programs/owts/docs/appdxk_ch7ta1401. pdf, Accessed 6-20-2025
California Plumbing Code, Section 709 Gravity Drainage, https://crw.cityofoceanside.com/etrakit3/viewAttachment.aspx?ActivityNo=BLDG18- 1020&Group=PERMIT&key=PSC%3A1805300321424472, Accessed 6-20-2025 California Water Boards, California Code of Regulations, Title 23, Division 3, Chapter 16, https://www.waterboards.ca.gov/ust/regulatory/docs/ccr_ch16_202010.pdf, Accessed 6-17-2025
City of Richmond, Certificate of Lateral Compliance,
https://www.ci.richmond.ca.us/2269/Certificate-of-Lateral-Compliance. Accessed 7-21- 2025
City of Richmond Chapter 15.04 - Zoning And Subdivision Regulations, https://library.municode.com/ca/richmond/codes/code_of_ordinances?nodeId=ARTXV ZOSU_CH15.04ZOSURE_SERIES_100GEPR, Accessed 6-6-2025
City of Richmond, Landslide Potential Map,
https://www.ci.richmond.ca.us/DocumentCenter/View/8854/Map-121---LandslidePotential?bidId=, Accessed 6-16-2025 City of Richmond, Liquefaction Potential Map,
https://www.ci.richmond.ca.us/DocumentCenter/View/8855/Map-122---LiquefactionPotential?bidId=. Accessed 6-16-2025 City of Richmond Ordinance No. 09-19 N.S., An Ordinance of the Council of the City of Richmond, California, Amending Article XII of the Municipal Code of the City of Richmond, Accessed 6-11-2025
2878
Temporary Sewage Holding Tank
City of Richmond
23 City of Richmond, Screening of Equipment,
https://library.municode.com/ca/richmond/codes/code_of_ordinances?nodeId=ARTXV ZOSU_CH15.04ZOSURE_SERIES_600GEST_ART15.04.601GESIRE_15.04.601.110SCEQ, Accessed 9-11-2025
City of Richmond, Chapter 12.19 Onsite Wastewater Treatment Systems, https://library.municode.com/ca/richmond/codes/code_of_ordinances?nodeId=ARTXIIP UWO_CH12.19ONWATRSY_12.19.030ADCOCOCOHEOFRESECODI, Accessed 1-19-2026 Contra Costa County, Contra Costa County Ordinance No. 2018-25, Accessed 5-22-2025 Contra Costa Hazardous Materials Programs, https://www.cchealth.org/health-and-safetyinformation/hazmat-programs, Accessed 6-3-2025 Contra Costa County, Health Officer Regulations for Sewage Collection and Disposal, Contra Costa County Ord. Cose 420-6.606, Accessed 5-22-2025
Environmental Protection Agency Onsite Wastewater Treatment Manual, https://www.epa.gov/sites/default/files/2015-
06/documents/2004_07_07_septics_septic_2002_osdm_all.pdf, Accessed 6-3-2025 Fiberglass Tank Solutions, Engineered Concrete Deadman System, https://fgtsolutions.com/wpcontent/uploads/2025/05/Concrete-Deadmen-Cut-sheets-2025.pdf, Accessed 6-10-2025 Florida Health County, Temporary Holding Tank Application, https://lee.floridahealth.gov/programs-and-services/environmental-health/onsitesewage-disposal/permits/holding-tanks.html, Accessed 5-22-2025 Holding Tank vs. Septic Tank: What’s the Difference, https://www.angi.com/articles/holdingtank-vs-septic-tank.htm, Accessed 6-10-2025 International Plumbing Code 2025, https://codes.iccsafe.org/content/IPC2024P1/chapter-7- sanitary-drainage#IPC2024P1_Ch07_Sec708, Accessed 6-20-2025 International Private Sewage Disposal, 2018 International Private Sewage Disposal Code, https://codes.iccsafe.org/content/IPSDC2018/chapter-8-tanks, Accessed 5-22-2025 Maine Department of Environmental Protection, Recommended Practices for Non-Hazardous, Industrial Wastewater Holding Tanks,
https://www.maine.gov/dep/water/wd/uic/holdingtanks.html Accessed 5-22-2025 Napa County, Holding Tanks and Hold and Haul Systems,
https://library.municode.com/ca/napa_county/codes/code_of_ordinances?nodeId=TIT 13WASEPUSE_CH13.52HOTAHOHASY, Accessed 5-22-2025
National Oceanic and Atmospheric Administration (NOAA), Damage-Resistant Practices for Designing Septic Systems in Coastal High Hazard Areas,
https://www.dropbox.com/scl/fi/hnteleqam6k8rw7v6e5hx/NOAA-Damage-ResistantPractices-for-Designing-Septic-Systems-in-Coastal-High-Hazard2879 Temporary Sewage Holding Tank
City of Richmond
24 Areas.pdf?rlkey=lwe0toedrzl6xm122e2i8c4vg&e=1&st=7g3sdgri&dl=0, Accessed 5-22- 2025
Protank 500 Gallon Above Ground Septic Holding Tank, https://www.protank.com/500gallonaboveground-plastic-septic-holding-tank-p2742736, Accessed 6-11-2025 Sacramento County, Wastewater Holding Tank, https://ecode360.com/44028394 San Bernardino Environmental Health Services, Sewage Holding Tank Application Packet, https://wp.sbcounty.gov/dph/wp-content/uploads/sites/7/2022/02/Sewage-HoldingTank-Application-Packet.pdf, Accessed 5-22-2025 Septic Tank: Types, Working Principle, Design, Size, Advantages & Disadvantages, https://testbook.com/civil-engineering/septic-tank-diagram-types, Accessed 6-02-2025 State of California, Waste Holding Tanks, https://www.law.cornell.edu/regulations/california/25- CCR-4517.8, Accessed 5-22-2025
State of Georgia, Code of Georgia Sewage Holding Tanks, https://law.justia.com/codes/georgia/title-12/chapter-15/article-1/section-12-15-5/, Accessed 5-22-2025
State of Vermont, Potable Water Supply and Wastewater System Permit, https://legislature.vermont.gov/statutes/section/10/064/01979, Accessed 5-22-2025 Texas Commission on Environmental Quality, Types of Municipal Solid Waste Processing and Disposal Facilities, and Wastes That May Be Accepted,
https://www.tceq.texas.gov/permitting/waste_permits/msw_permits/wastetypes/msw_types.html, Accessed 6-10-2025 Vector Solutions, Aboveground Storage Tank Requirements (AST), https://www.vectorsolutions.com/courses/aboveground-storage-tank-requirements-ast-/, Accessed 6-10-2025
Washington State Department of Health, Department Standards and Guidance for Performance, Application, Design, and Operation & Maintenance: Holding Tank and Incinerator Sewage Systems,
https://doh.wa.gov/sites/default/files/legacy/Documents/Pubs/337-006.pdf, Accessed 5- 22-2025
Wieser Concrete Septic/Holding Tanks, https://wieserconcrete.com/product/septic-holdingtanks/, Accessed 6-11-2025 Wholesale Septic Supply, SP-400 Septic Tank Alarm with Float, https://www.wholesalesepticsupply.com/products/sp-400-septic-tank-alarm-with-float, Accessed 6-10-2025
World Health Organization, Guidelines on Sanitation and Health, https://iris.who.int/bitstream/handle/10665/274939/9789241514705-eng.pdf, Accessed 5- 22-2025
2880
Temporary Sewage Holding Tank
City of Richmond
Appendix A
Keller Beach Sanitary Sewer (KBSS) Moratorium Area
2881
8 6
8"-14.5'
6"-35'
8"-28'
12"-37'
6"-50'
6"-'
6"-48'
6"-40'
6"-73'
6"-58'
6"-65'
8"-65'
6"-55'
6"-73'
8"-'
6"-72'
6"-72'
12"-73'
6"-74'
6"-70'
6"-77'
6"-133'
6"-90'
6"-100'
8"-84'
6"-87'
6"-86.8'
6"-93'
6"-1
00'
6"-100'
6"-103'
6"-1
02'
6"-81'
6"-101'
6"-101'
6"-99'
6"-113'
6"-100'
6"-103'
6"-105'
6"-114'
6"-104'
6"-121'
6"-122'
21"-124'
36"-130'
6"-145'
12"-127.9'
21"-132'
6"-133'
6"-154'
6"-134'
6"-141'
6"-139'
6"-'
4"-146'
6"-150'
6"-149'
8"-106'
6"-137.5'
6"-151' 8"-150.5'
6"-150'
8"-152'
8"-159'
6"-155'
6"-155'
6"-257'
8"-152'
6"-165'
6"-176'
6"-170'
6"-161'
6"-172'
8"-170'
6"-175'
12"-173'
6"-176'
6"-178'
6"-181'
6"-175'
6"-157'
6"-160'
8"-344'
10"-185'
6"-196'
6"-215'
6"-175'
8"-201'
6"-200'
8"-20
5'
6"-216'
6"-192'
6"-193'
10"-207'
6"-220'
39"-227'
8"-219'
6"-220'
12"-218'
6"-220'
6"-218'
16"-223'
6"-201'
6"-217'
6"-235'
6"-233'
6"-230'
6"-235'
6"-235'
10"-246'
12"-242'
6"-244'
6"-145'
10"-252'
6"-254'
6"-250'
6"-239'
6"-415'
12"-261'
8"-268'
12"-223'
6"-263'
8"-273'
6"-263'
10"-275'
6"-280'
6"-283'
6"-243'
6"-293'
6"-288'
6"-289'
6"-290'
6"-292'
12"-292'
10"-295'
6"-295.38'
6"-300'
8"-301'
12"-306'
8"-308.54'
6"-311'
10"-297'
6"-315'
12"-328'
6"-328'
8"-337'
6"-363'
12"-356'
6"-346'
8"-345'
6"-400'
6"-356'
6"-375'
8"-369'
6"-370'
6"-371'
12"-393'
15"-454'
6"-380'
36"-406'
12"-393'
6"-409'
6"-422'
10"-422'
36"-418'
6"-434'
36"-441'
8"-456'
6"-476'
8"-250'
12"-514'
6"-518'
21"-674'
CASTRO ST
TEWKSBURY AVE
PACIFIC AVE
GOLDEN
GATE AVE
I 580
S
GARRARD
BLVD
CONTRA COSTA ST
WASHINGTON
AV
E
W
RICHMOND AVE
D
O
RNAN
D
R
MARINE ST
GRANDVIEW CT
WESTERN DR
SANTA FE AVE
CREST AVE
LEB VED
ERE AVE
HIGH ST
TREMONT AVE
LOBOS CT
CYPRESSPOINT RD
MARTINA ST
CLARENCE ST
SUMMIT PL
LOBOS AVE
COTTAGE AVE
SCENIC
AVE
BISHOP ALY
OCEAN AVE
CASEYDR
NICHOLL AVE
PIEDMONT PL
RAILROAD AVE
TUN
NEL AVE
EDDY ST
DELFINO AVE
PARK PL
TERRACE AVE
VINE AVE
ALLEY
WATER ST
CHEVRON WAY
BISHOP AVE
F7SS1
Keller Beach
Pump Station
1 inch = 350 feet
0 350 700
Feet
Legend
Sewer Fitting
Lamphole, Active
Lamphole, Private
Lamphole, Buried
Other
Wye
Sewer Manhole
Active
Buried
Abandoned
Sewer Structure
PumpStation
Sewer Force Main
Force Main
Sewer Gravity Main
Active
Relief
Abandoned
PUBLIC
WORKS
DEPARTMENT
KELLER BEACH LINE
Parcel Lines
Moratorium Parcels by Use Code
Fourplex
Single family, 1 residence on 2 or more sites
Single family on other than single family land
Single family residential, detached, w/common area (normal Subdivision type PUD); duets w/common area Single family, 2 or more residential on 1 or more sites Attached PUD’s, cluster homes, co-ops, condos, townhouses, etc.
Duplex
Triplex
Single family, 1 residence on 1 Site and Duets w/o common areas Apartments, 5-12 units, inclusive
Residential Vacant, 1 site (includes PUD sites)
Residential Vacant, 2 or more sites
Residential Vacant, unbuildable
Industrial Vacant Land (not part of industrial park or P. and D.) No Data
Common area parcels in PUD’s (open spaces, recreational facilities) Government-owned, with or without buildings (federal, state, city, BART) Miscellaneous improvements, 1 site
January 2022
2882
Temporary Sewage Holding Tank
City of Richmond
Appendix B
Safe Harbor Minimum Requirements
2883
Safe Harbor Minimum Requirements
City of Richmond
Safe Harbor Quick Selection List (Deemed-to-Comply)
A. Minimum Setbacks (from Table 1)
☐ Bays/streams/rivers/canals: 100 ft
☐ Ditches/culverts/ephemeral streams: 50 ft
☐ Lakes/reservoirs: 100 ft
☐ Depressions/low areas: 5 ft
☐ Cutbanks/fill banks/escarpments/embankments/natural bluffs: 10 ft ☐ Fill areas/unstable soil/unstable landforms/drainage swales: 10 ft ☐ Trees: 10 ft
☐ Structures/foundations: 10 ft
☐ Underground irrigation/drainage (watertight piping): 10 ft ☐ Underground irrigation/drainage (non-watertight piping): 100 ft ☐ Easements: 5 ft
☐ Public drinking water well: 100 ft
☐ Pressurized water supply line: 10 ft
☐ Rocky/fissured ground: > 50 ft (and greater than the nearest water supply siting distance)
B. Minimum Tank Sizing (Section 3.1)
☐ Residential (1–2 bedrooms): ≥ 1,000 gallons
☐ Residential (3+ bedrooms): ≥ 1,000 gallons for first 2 bedrooms + 250 gallons per additional bedroom
☐ Other structures: Minimum capacity = (peak daily sewage flow × 0.75) + 1,125 gallons C. Minimum Pumping / Disposal Frequency (Section 5.3)
☐ Pumping: at least once per week, or frequent enough (per metering/records) to prevent exceeding 75% of working volume between pump-outs D. Alarm Setpoint (Section 3.3)
☐ High-water alarm indicates the tank is approximately 75% filled E. Materials (Table 2)
☐ Tank material (select one): Pre-cast concrete, fiberglass, or polyethylene ☐ Appurtenances: Risers, lids, seals/gaskets, and fittings are compatible with wastewater service and installed per manufacturer specifications.
2884
Safe Harbor Minimum Requirements
City of Richmond
☐ Piping/Connections: Piping and fittings are compatible with wastewater service and installed per manufacturer specifications, consistent with the materials and limitations identified in Table 2.
2885
Temporary Sewage Holding Tank
City of Richmond
Appendix C
Basic Maintenance Checklist for Household Sewage
Holding Tanks
2886
Basic Maintenance Checklist for
Household Sewage Holding Tanks
City of Richmond
Weekly Checks
a. Check the tank alarm system
i. Ensure both the sound and visual alarms are working (they should go off when the tank is ~75% full).
b. Look for leaks or smells
i. Walk around the tank and nearby pipes. Report any foul odors or signs of leakage to the City of Richmond Public Works Department immediately. c. Inspect the access lid
i. Make sure the lid is tightly sealed and undamaged to prevent odors and pests.
Weekly Pumping
a. Schedule weekly pumping
i. Your tank must be pumped at least once per week to avoid overflow or odor problems.
b. Confirm the hauler provides a receipt or notification i. Keep a record of each pump-out for health and safety compliance.
Monthly Routine
a. Test the alarm system manually
i. Follow the alarm instructions to test it.
b. Inspect the tank label/sign
i. Ensure signage says, "Non-Hazardous Wastewater" (helpful in emergencies).
Safety Do’s and Don’ts
a. Do not flush hazardous materials.
b. Do not block access to the tank.
i. Make sure trucks can access the tank for pumping. Maintain a 10-foot clear area around it.
Emergency & Notifications
a. Report problems quickly
i. If there’s a leak, overflow, or system failure, notify the City of Richmond Public Works Department.
b. Inform new tenants/owners
i. If you sell or rent your home, let the new occupants know about the holding tank and share this checklist.
2887
Temporary Sewage Holding Tank
City of Richmond
Appendix D
Spill Response and Reporting Guideline
2888
Spill Response and Reporting
Guidelines
City of Richmond
Immediate Containment and Cleanup of Spills
a. Use Proper Safety Equipment and Cleanup Materials
i. PPE: gloves, boots, eye protection, disposable coveralls, mask. ii. Containment Equipment: absorbent pads, sandbags, plastic sheeting. iii. Cleanup Equipment: mop, bucket, EPA-registered disinfectant (i.e., bleach solution).
iv. Waste Handling Equipment: heavy-duty trash bags, sealed containers labeled as “Non-Hazardous”.
b. Steps for Containment and Cleanup
i. Secure the area to keep people away.
ii. Stop the spread of contaminated sources if safe to do so. iii. Contain the spill by surrounding the contaminated area with absorbents or sandbags to prevent the sewage from spreading.
iv. Once contained, clean the spill area using absorbents or sandbags to soak up the liquid.
v. Disposal of all non-hazardous waste at an approved site (no dumping into surface or groundwater).
vi. Decontaminate effected equipment with approved EPA-registered disinfectant.
vii. Wash hands thoroughly.
viii. If you ingest or come into direct contact with sewage or chemicals, immediately contact emergency medical services (911) for serious symptoms or Poison Control (1-800-222-1222) for guidance. For nonemergency exposures, contact your primary care physician, local health department, or an urgent care facility.
Report on the Spill
a. Notify the City of Richmond Public Works Department of the spill immediately or within 24 hours.
b. In the event of chemical spills, report the spill to the Department of Environmental Protection (DEP).
Manifest System for Sewage Waste Disposal
a. All waste from holding tanks, following spills, must be tracked using a manifest system to ensure safe and lawful disposal.
Emergency Plan Requirement for Spills
a. All holding tank systems must include a written emergency response plan that includes:
i. City of Richmond Public Works Department (510-620-5509 or [email protected]), and Sewage Hauler.
ii. Steps for sewage spills and procedures for containment, cleanup, reporting, and manifest system (Refer to Item 1 for procedural examples). The incident must be reported to the City of Richmond Public Works Department within 24 hours. All waste must be tracked through a manifest system documenting collection, transport, and final disposal at an approved facility, ensuring full accountability and regulatory compliance.
2889
Temporary Sewage Holding Tank
City of Richmond
Appendix E
Landslide Potential Map
2890
City of Richmond - Landslide Potential Map
Esri, NASA, NGA, USGS, FEMA, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community,
DOC/CGS
Landslide Susceptiblity Classes
0 III
V
VI
VII
VIII
IX
X
World_Hillshade
9/11/2025 0 1 20.5 mi
0 1.5 30.75 km
1:82,422
2891
Temporary Sewage Holding Tank
City of Richmond
Appendix F
Liquefaction Potential Map
2892
City of Richmond - Liquefaction Potential Map
Esri, NASA, NGA, USGS, Earthstar Geographics, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community
CGS Alquist Priolo Fault Traces
Accurately Located
Approximately Located
Inferred
Concealed
CGS Alquist-Priolo Fault Zones
CGS Liquefaction Zones
CGS Landslide Zones
CGS SHZ Unevaluated Areas
9/10/2025, 6:32:50 AM 0 1.5 30.75 mi
0 2.5 51.25 km
1:113,927
2893
City of Richmond: Temporary Sewage
Holding Tank Permit Process
City of Richmond
450 Civic Center Plaza
Richmond, CA 94804
Contact Watearth Principal
Jennifer J. Walker PE, DWRE, ENV SP, CFM, QSD, LEED AP BD+C 1151 Harbor Bay Parkway Suite 208H
Alameda, CA 94502
510.529.5552
[email protected]
March 13, 2026
2894
Temporary Sewage Holding
Tank Permit Process
City of Richmond
i
Table of Contents
Table of Contents ......................................................................................................................................... i Figures .......................................................................................................................................................... ii Appendices ................................................................................................................................................. ii Acronyms and Abbreviations ................................................................................................................... ii Definition of Terms ...................................................................................................................................... iii
1.0 Introduction ........................................................................................................................................... 1
2.0 Permit Process ....................................................................................................................................... 2
2.1 Construction Permit........................................................................................................................... 3
2.1.1 Plot Plan .................................................................................................................................. 3
2.1.2 Floor Plan ................................................................................................................................ 5
2.1.3 Screening ............................................................................................................................... 5
2.1.4 Tank Replacements .............................................................................................................. 5
2.1.5 Installation .............................................................................................................................. 5
2.1.6 Construction Permit Expiration ............................................................................................ 5
2.2 Operational Requirements............................................................................................................... 6
2.2.1 Operational Management Requirements ......................................................................... 6
2.2.2 Manifest System ..................................................................................................................... 6
2.3 Abandonment Requirements .......................................................................................................... 7
2.3.1 Abandonment Conditions ................................................................................................... 7
3.0 Other Provisions ..................................................................................................................................... 7
3.1 Authority ............................................................................................................................................. 7
3.2 Roles and Responsibilities ................................................................................................................. 8
3.3.1 Public Works Department .................................................................................................... 8
3.3.2 The City of Richmond Planning Division ............................................................................. 8
3.3 Temporary Structure.......................................................................................................................... 8
3.4 Appeal ................................................................................................................................................ 8 References ................................................................................................................................................. 10 2895
Temporary Sewage Holding
Tank Permit Process
City of Richmond
ii
Figures
Figure 1: Schematic Example of a Sewage Holding Tank System ........................................................ 1 Figure 2: Sewage Holding Tank ................................................................................................................. 2 Figure 3: Permit Process Flow Diagram .................................................................................................... 3 Appendices
Appendix A – Keller Beach Sanitary Sewer (KBSS) Moratorium Area Appendix B – Building Division Permit Application
Appendix C – Grading Permit
Acronyms and Abbreviations
Acronym/Abbreviation Full Form
ACI American Concrete Institute
ASSE American Society of Safety Engineers
CBC California Building Code
DEP Department of Environmental Protection
FEMA Federal Emergency Management Agency
ft feet
KBSS Keller Beach Sanitary Sewer
NOAA National Oceanic and Atmospheric Administration
2896
Temporary Sewage Holding
Tank Permit Process
City of Richmond
iii
Definition of Terms
Abandon - To remove liquid waste from and either excavate or otherwise render inoperable a cesspool, privy, sewage holding tank, or tank utilized in an onsite wastewater treatment system.
Appeal – A legal proceeding by which a case is brought before a higher court for review of the decision of a lower court.
Building Line - A line running parallel to a lot line that is the same distance from the lot line as the closest portion of a building on the site, typically used in reference to the required setback distance.
Contour Line - Defined as a line drawn on a topographic map to indicate ground elevation or depression.
Health Officer - Defined as the Contra Costa County Health Officer and/or their duly authorized deputies and subordinates.
Keller Beach Sanitary Sewer Moratorium – The Urgency Ordinance No. 01-22 imposed an immediate 45-day moratorium on the issuance of building permits for certain development of activities requiring new connections to the KBSS in order for the City to evaluate remediation options and development alternatives in lieu of connection to the KBSS.
Manifest System - Designed to track sewage waste from the time it leaves the generator facility or residence where it was produced until it reaches the off-site waste management facility that will store, treat, or dispose of it. The manifest system provides a detailed record of the items being transported, including their contents, destination, and handling instructions.
Moratorium - Delay in performing an obligation or taking an action legally authorized or simply agreed to be temporary.
Monitoring Wells - Principally used for observing groundwater levels and flow conditions, obtaining samples for determining groundwater quality, and for evaluating hydraulic properties of water-bearing strata.
Natural Bluff – An undisturbed geological feature with a steep slope, typically adjacent to a water body or valley, formed through natural erosional processes.
Onsite Wastewater Treatment System - Defined as a sewage treatment and disposal system that includes a septic tank and disposal field, serves one or more structures on only one lot, and is projected to receive a sewage flow of 10,000 gallons or less per day.
Peak Daily Sewage Flow - The maximum volume of sewage that a sewage disposal system is projected to receive in a 24-hour period.
Percolation Test - A percolation test determines the rate of water absorption into the ground.
Professional Septic Tank Cleaner – A professional engaged in the business of cleaning septic tanks, sewage holding tanks, onsite wastewater treatment systems, privies, r seepage pits.
Qualified Professional - A civil engineer, environmental health specialist, geologist, professional soil scientist, or engineering geologist, who is licensed, registered or certified by the State of California.
2897
Temporary Sewage Holding
Tank Permit Process
City of Richmond
iv
Sanitary Sewer - A wastewater collection system, owned and operated by a public agency with legal authority to collect wastewater from structures within the geographical area controlled by the public agency.
Septic Tank – A receptacle or vault used to collect organic waste discharge from the house sewer.
Sewage - Defined as the liquid waste that contains or may be contaminated with human or animal excrement or offal.
Sewage Holding Tank – An alternative to a conventional onsite wastewater treatment system.
The sewage holding tank is a sewage collection system that includes a watertight tank designed to collect and temporarily store sewage that is periodically removed by a permitted Professional Septic Tank Cleaner.
Sewage Sludge Hauler - A person who pumps or moves sewage sludge offsite by means of landbased vehicles, barges, ships, rails, pipelines, or other modes of transportation.
Wastewater - Defined as liquid waste, including but not limited to sewage.
Watertight - Tight construction or fit as to be impermeable to water. 2898
Temporary Sewage Holding
Tank Permit Process
City of Richmond
1 1.0 Introduction
The purpose of this document is to establish the permit process for the temporary use of sewage holding tanks in areas of the City of Richmond that are affected by sanitary sewer connection moratoriums. These processes are intended to address immediate infrastructure limitations, particularly in the Keller Beach Sanitary Sewer (KBSS) moratorium area, while enabling controlled development and safeguarding public health and environmental quality. The KBSS moratorium area is shown in Appendix A.
Although the initial application of the permit process is focused on the KBSS area, the provisions outlined in this document are designed to be adaptable and enforceable in any future moratorium zones citywide. They are also applicable in areas not under the moratorium, but where implementation may still be necessary, such as for emergency backup holding tanks.
The temporary sewage holding tank system will serve the “structure” until either a new onsite wastewater treatment system is approved (if permitted by the City of Richmond) or adequate capacity becomes available in the public sewerage system (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018). These systems must be designed, installed, and maintained per the criteria outlined in the “City of Richmond Temporary Sewage Holding Tank Standards” document to prevent public health hazards, groundwater contamination, nuisance conditions, and structural failures. A schematic example of a sewage holding tank system is shown in Figure 1. A sewage holding tank example is shown in Figure 2.
The sewage holding tank permit process is to be applied in coordination with applicable local ordinances, state health and safety codes, and relevant engineering best practices.
The City of Richmond, consistent with applicable Contra Costa County Health Officer regulations, is responsible for enforcing regulations and restrictions related to septic tanks and other onsite wastewater treatment systems.
Figure 1: Schematic Example of a Sewage Holding Tank System 2899
Temporary Sewage Holding
Tank Permit Process
City of Richmond
2 Figure 2: Sewage Holding Tank
2.0 Permit Process
The permit process section outlines the administrative requirements for obtaining the necessary approvals. The section covers the construction permit application process, including required documentation, operational requirements, abandonment requirements, and other provisions (such as those related to temporary structures and the appeals process for permit decisions). The flow diagram of the permit process is shown in Figure 3.
These permit procedures are adopted by the City of Richmond pursuant to the Municipal Code Chapter 12.19, “Onsite Wastewater Treatment Systems”. The City of Richmond Temporary Sewage Holding Tank Standards are incorporated by reference as the governing technical performance and design criteria.
In the future, the City of Richmond may propose updates or new regulations in order to establish more detailed or specific provisions of this chapter. The City of Richmond, consistent with applicable Contra Costa County Health Officer regulations, is responsible for the enforcement of this guideline and all adopted regulations (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
2900
Temporary Sewage Holding
Tank Permit Process
City of Richmond
3 Figure 3: Permit Process Flow Diagram
2.1 Construction Permit
The construction permit states that any application for a permit to construct, alter, relocate, or replace a sewage holding tank, or primary component thereof, must be submitted using the City of Richmond Building Division Permit Application approved by the City of Richmond, as shown in Appendix B.
Applications will be accepted only if they are complete. A complete application must include a fully completed City of Richmond Building Division Permit Application and all of the supporting items described below. Depending on site conditions, a City of Richmond Grading Permit, as shown in Appendix C, may also be required. This permit includes requirements for submittal of a Geotechnical/Soils Report evaluating subsurface conditions in accordance with the applicable provisions of the California Building Code (CBC) (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
2.1.1 Plot Plan
Four copies of a plot plan must be submitted with the application. The plot plan must be drawn to scale of not less than 1 inch equals 20 feet and be a minimum of 8½ inches x 11 inches in size. A plot plan must contain all of the following information regarding the lot where the sewage holding tank to be constructed or altered will be located:
1. A location map, indicating the location of the lot with respect to abutting lots and the nearest public road;
2. Lot boundaries and dimensions;
2901
Temporary Sewage Holding
Tank Permit Process
City of Richmond
4 3. The name of the lot owner, the lot owner’s address, and assessor’s parcel number of the lot;
4. A north arrow and plan scale (including both a written scale and a bar scale);
5. The location of all water and monitoring wells on the subject lot and all abutting lots, watercourses and water bodies (including, but not limited to, springs, marsh areas, drainage ditches, channels), cuts, embankments, natural bluffs or unstable land forms within 100 feet of any portion of the sewage holding tanks to be constructed or altered, and any reserved area. Refer to the Section 3.0 Design Requirements of the City of Richmond Temporary Sewage Holding Tank Standards for more details about the minimum setbacks;
6. The location of any and all existing and proposed buildings, swimming pools, retaining walls, driveways, paved areas, water lines, underground utilities, storage tanks (below-ground and above-ground), trees equal to or greater than 6 inches in diameter (measured at 4.5 feet from the ground surface), and easements located on the lot that are within 25 feet of the sewage holding tank to be constructed or altered;
7. Contour lines, if slopes are greater than 5%. If slopes are equal to or less than 5%, the direction and percentage of slopes must be shown;
8. The location of any existing onsite wastewater treatment systems and other sewage disposal systems on the lot;
9. The layout (including dimensions) of the sewage holding tank to be constructed or altered. This includes the location of pipes, valves, or related components intended for connection to a future sewer line, as well as an abandonment plan for the holding tank once the connection is made. Refer to Section 3.4 Plumbing and Piping of the City of Richmond Temporary Sewage Holding Tank Standards for more information on the Future Connection to the City’s Sanitary Sewer;
10. The location of each soil percolation test hole and soil profile hole. Soil investigations and testing must be conducted to evaluate subsurface conditions at the site and shall be performed in accordance with the California Building Code (CBC) Sections 1803.3 and 1803.5. Soil types encountered in test holes and excavations must be described and classified in accordance with the American Society for Testing and Materials (ASTM) or the United States Department of Agriculture (USDA) Soil Classification System (Unified). A geotechnical investigation may also be required by the Building Division for other conditions, as specified by the CBC; and
11. The name, signature, stamp or seal of the qualified professional certified by the State of California who prepared the plan, and the date the plan was signed and stamped or sealed.
12. If submittals propose alternatives, they must include a performance justification (hydraulic calculations, structural design, and an operations and maintenance plan) demonstrating that the objectives in the Standards are met.
Following completion of the required information outlined above, the final approved plans and specifications must be included in the material submittal upon approval of the construction pemit. The design of the sewage holding tank system must comply with 2902
Temporary Sewage Holding
Tank Permit Process
City of Richmond
5 Section 3.0 of the City of Richmond Temporary Sewage Holding Tank Standards, including sizing, material selection, access, termination fittings, buoyancy, plumbing and pipiing, and alarm system integration.
For projects in Federal Emergency Management Agency (FEMA) coastal zones, calculations and drawings demonstrating that the temporary holding tank complies with FEMA coastal zone construction criteria should be required. The system must be designed and certified by a registered professional engineer. Refer to Section 2.4 Site and Setback for Coastal Areas of the City of Richmond Temporary Sewage Holding Tank Standards for more information.
2.1.2 Floor Plan
Four copies of the floor plan for the structure to be served by the sewage holding tank, whether newly constructed or altered, must be submitted with the application. The floor plan must be drawn to a scale of no less than 1-inch equals 20 feet and must be at least 8½ inches x 11 inches in size. The floor plan must contain all of the following information:
1. The layout of all rooms on each floor of the structure;
2. The clear labeling of each room as to type; and
3. The name and signature of the qualified professional certified by the State of California who prepared the plan.
2.1.3 Screening
Any sewage holding tank visible above-ground must be screened from the public right-ofway. Where applicable, installation proposals may require review and approval by the City of Richmond’s Planning Division. For additional information regarding screening details, refer to City of Richmond Temporary Sewage Holding Tank Standards.
2.1.4 Tank Replacements
An application for a permit to replace a sewage holding tank must include a copy of the manufacturer’s specifications for the replacement tank, or refer to Section 3.0 Design Requirements of the City of Richmond Temporary Sewage Holding Tank Standards for more design details.
2.1.5 Installation
The installation of a sewage holding tank system may be lawfully performed only under a valid sewage holding tank permit (construction permit) issued by the City of Richmond, consistent with applicable Contra Costa County Health Officer regulations. Refer to the Installation Procedures in the City of Richmond Temporary Holding Tank Standards for further information on installation and inspection requirements to comply with the standards.
2.1.6 Construction Permit Expiration
Every construction permit issued by the City of Richmond, consistent with applicable Contra Costa Health Officer regulations, under this chapter becomes void if the work authorized by the construction permit is not commenced within 180 days from the permit’s date. The permit also becomes void if the work is suspended or abandoned for 180 days without justification satisfying the City of Richmond as being beyond the permittee’s control and could not be remedied. Once a construction permit becomes 2903
Temporary Sewage Holding
Tank Permit Process
City of Richmond
6 void, a new construction permit must be obtained before any work is commenced or recommenced.
2.2 Operational Requirements
Operation of sewage holding tanks within the City of Richmond must comply with applicable Contra Costa County Health Officer regulations and the requirements outlined in this section. These requirements are intended to ensure proper pumping, hauling, disposal practices, and system maintenance.
2.2.1 Operational Management Requirements
The owner or operator must demonstrate the following as a minimum:
1. Pumping, hauling, and disposal must be performed by a sewage sludge hauler that holds all required licenses and approvals from Contra Consta County and other applicable agencies. Documentation of current certification must be maintained onsite and provided upon request;
2. Disposal of sewage must be at a site or sites approved by the City of Richmond, consistent with applicable Contra Costa County Health Officer regulations, within the jurisdiction where the disposal occurs;
3. Operational records must be maintained by the owner and pumper. These records include information about pumping frequency, sewage volume, disposal site(s), proof of acceptance by the disposal site operator, alarms, and system servicing and repairs;
4. Photocopies of operation records must be submitted to the City of Richmond upon request;
5. An emergency response plan that addresses possible failure of a sewage sludge hauler to provide service, hydraulic overload of the system, or sewage spill at the site. Refer to Section 6.3 Emergency Notification of the City of Richmond Temporary Holding Tank Standards for further information.
2.2.2 Manifest System
The sewage holding tank provider shall be responsible for maintaining a manifest system to ensure that all sewage pumped from a holding tank is disposed of properly.
The sewage holding tank provider shall always maintain a valid contract with a licensed sewage sludge hauler. The contract requires the licensed sewage sludge hauler to provide written notice of dates of pumping and volume of sewage pumped. In addition, a licensed sewage sludge hauler must obtain a Richmond Business License Number.
Operators are also requred to obtain a permit decal for their sewage pumping vehicles.
The permit decal, as required by Section 420-6.1206 of Contra Costa County Ordinance Code 420-6.606, must be displayed permanently to the rear of the sewage pumping vehicle.
In emergency situations, the manifest system should include provisions for establishing an emergency notification. Refer to the Emergency Notification of the City of Richmond Temporary Holding Tank Standards for further information. 2904
Temporary Sewage Holding
Tank Permit Process
City of Richmond
7 2.3 Abandonment Requirements
This subsection provides guidance on the circumstances under which a sewage holding tank must be abandoned and describes the role of the City of Richmond in overseeing the process.
2.3.1 Abandonment Conditions
1. The property owner or agent shall coordinate with the City of Richmond when abandoning an existing sewage holding tank under this policy and shall comply with applicable Contra Costa County abandonment standards and state regulations.
2. The following circumstances require that a sewage holding tank system be promptly abandoned:
a. The system is replaced with a connection to a sanitary sewer, an onsite wastewater treatment system or another sewage holding tank system; b. The system was constructed in violation of any applicable laws or regulations; or
c. Use of the system has ceased.
3. Use of a sewage holding tank system connected to a structure must terminate upon completion of construction of a new onsite wastewater treatment system that will serve the structure (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018).
4. Use of a sewage holding tank system connected to a structure must terminate within 90 calendar days after the health officer determines that connection to a sanitary sewer is available to the structure (Contra Costa County Ord. Code ß 420-
6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018). Upon completion of the sewer connection and sewage holding tank abandonment, a Certificate of Lateral Compliance should be approved by the City of Richmond.
5. Refer to the Abandonment Plan in the City of Richmond Temporary Sewage Holding Tank Standards for more details on the abandonment provisions.
3.0 Other Provisions
This section includes guidance on the conditions under which temporary structures may be connected to sewage holding tanks. It also addresses the procedure for appealing decisions made by the city when local ordinances adopt applicable county regulations.
3.1 Authority
Permit procedures are adopted by the City of Richmond pursuant to Municipal Code Chapter 12.19, “Onsite Wastewater Treatment Systems”. The City of Richmond is the authority having jurisdiction for the review, approval, and enforcement of temporary sewage holding tank construction permits, operation requirements, and abandonment requirements issued under this policy.
2905
Temporary Sewage Holding
Tank Permit Process
City of Richmond
8 Responsibility for enforcement is retained by the City and includes the City’s independent enforcement authority, the City’s right to impose stop-work orders, and the City’s right to revoke permits or recover costs. The City will refer to the City of Richmond Temporary Sewage Holding Tank Standards and will maintain consistency with the Contra Costa County Health Officer Regulations for Sewage Collection and Disposal (Contra Costa County Ord. Code ß 420-6.606; Contra Costa County Health Officer Regulations for Sewage Collection and Disposal, 2018) and applicable state regulations; however, Contra Costa County is not the primary reviewing or permitting agency for these temporary holding tanks.
This document establishes the administrative requirements for permit applications, review, issuance, and enforcement, and incorporates by reference the City of Richmond Temporary Sewage Holding Tank Standards as the governing technical performance and design criteria.
3.2 Roles and Responsibilities
This subsection clarifies the roles and responsibilities of the City of Richmond, and the City of Richmond Planning Division in the administration and enforcement of the Temporary Sewage Holding Tank Permit Process. Applicable County requirements are incorporated by reference where noted.
3.3.1 Public Works Department
The City of Richmond, through Public Works and Utilities, is responsible for policy under Municipal Code Chapters 12.19 and 12.20, review and approval of sewer connections, enforcement of permit requirements, application of penalties pursuant to Chapter 12.20, and processing of appeals to the City Council in accordance with Chapter 12.19.
3.3.2 The City of Richmond Planning Division
The City of Richmond Planning Division is responsible for review of screening, zoning, and aesthetic considerations associated with temporary sewage holding tank installations.
3.3 Temporary Structure
A temporary structure containing plumbing fixtures may be connected to a sewage holding tank system if the system was incorporated into the original design of the temporary structure. As used in this subsection, “temporary structure” means a structure that is placed at the site of a permitted construction project for use only during the construction project duration and then removed at the conclusion of the project.
3.4 Appeal
Any appeal of a decision by the City of Richmond related to a temporary sewage holding tank permit, enforcement action, or interpretation of these procedures or the City of Richmond Temporary Sewage Holding Tank Standards shall be filed and decided in accordance with the appeal provisions of Municipal Code Chapter 12.19, “Onsite Wastewater Treatment Systems”.
In resolving such appeals, the City will interpret and apply these standards in a manner consistent with applicable Contra Costa County Health Officer regulations.
Appeals shall be filed and processed in accordance with the procedures, timelines, and requirements established in Municipal Code Chapter 12.19. The Richmond City Council 2906
Temporary Sewage Holding
Tank Permit Process
City of Richmond
9 shall review appeals based on the administrative record and apply the applicable standard of review set forth in the Municipal Code. Appeal procedures and timelines are subject to modification as City standards, ordinances, or applicable regulations are amended.
2907
Temporary Sewage Holding
Tank Permit Process
City of Richmond
10 References
Barr, GRAF Heavy-Duty Septic Holding Tanks, https://www.barrplastics.com/products/grafheavy-duty-septic-sewage-holding-tanks, Accessed 6-16-2025 California Building Standards Code, https://www.dgs.ca.gov/BSC/Codes, Accessed 6-3- 2025
California Building Standards Commission, California Building Code (CBC), Sections 1803.3 and 1803.5, Accessed 3-13-2026
California Code of Regulations, Onsite Wastewater Treatment System, https://www.waterboards.ca.gov/water_issues/programs/owts/docs/appdxk_ch7t a1401.pdf, Accessed 6-20-2025
California Department of Water Resources, Monitoring Well Standards, https://water.ca.gov/Programs/Groundwater-Management/Wells/WellStandards/Combined-Well-Standards/Monitoring-Introduction, Accessed 7-10- 2025
California Water Boards, California Code of Regulations, Title 23, Division 3, Chapter 16, https://www.waterboards.ca.gov/ust/regulatory/docs/ccr_ch16_202010.pdf, Accessed 6-17-2025
City of Richmond, Building Division Permit Application, https://www.ci.richmond.ca.us/DocumentCenter/View/28142/Building-PermitApplication-Fillable-Form-2021?bidId=, Accessed 3-13-2026 City of Richmond, Certificate of Lateral Compliance,
https://www.ci.richmond.ca.us/2269/Certificate-of-Lateral-Compliance. Accessed 7-21-2025
City of Richmond, Grading Permit,
https://www.ci.richmond.ca.us/DocumentCenter/View/27131/Grading-PermitChecklist?bidId=. Accessed 3-13-2026 City of Richmond Ordinance No. 09-19 N.S., An Ordinance of the Council of the City of Richmond, California, Amending Article XII of the Municipal Code of the City of Richmond, Accessed 6-11-2025
City of Richmond, Keller Beach Sanitary Sewer Moratorium, https://www.ci.richmond.ca.us/4219/Keller-Beach, Accessed 7-29-2025 City of Richmond, Screening of Equipment,
https://library.municode.com/ca/richmond/codes/code_of_ordinances?nodeId= ARTXVZOSU_CH15.04ZOSURE_SERIES_600GEST_ART15.04.601GESIRE_15.04.601.110SC EQ, Accessed 9-11-2025
Contra Costa County, Contra Costa County Ordinance No. 2018-25, Accessed 5-22-2025 Contra Costa County, Health Officer Regulations for Sewage Collection and Disposal, Contra Costa County Ord. Cose 420-6.606, Accessed 5-22-2025 2908
Temporary Sewage Holding
Tank Permit Process
City of Richmond
11 Environmental Protection Agency, Hazardous Waste Manifest System, https://www.epa.gov/hwgenerators/hazardous-waste-manifest-system, Accessed 7-18-2025
Environmental Protection Agency Onsite Wastewater Treatment Manual, https://www.epa.gov/sites/default/files/2015-
06/documents/2004_07_07_septics_septic_2002_osdm_all.pdf, Accessed 6-3-2025 Florida Health County, Temporary Holding Tank Application, https://lee.floridahealth.gov/programs-and-services/environmental-health/onsitesewage-disposal/permits/holding-tanks.html, Accessed 5-22-2025 Holding Tank vs. Septic Tank: What’s the Difference,
https://www.angi.com/articles/holding-tank-vs-septic-tank.htm, Accessed 6-10- 2025
Napa County, Holding Tanks and Hold and Haul Systems,
https://library.municode.com/ca/napa_county/codes/code_of_ordinances?nod eId=TIT13WASEPUSE_CH13.52HOTAHOHASY, Accessed 5-22-2025 National Oceanic and Atmospheric Administration (NOAA), Damage-Resistant Practices for Designing Septic Systems in Coastal High Hazard Areas, https://www.dropbox.com/scl/fi/hnteleqam6k8rw7v6e5hx/NOAA-DamageResistant-Practices-for-Designing-Septic-Systems-in-Coastal-High-HazardAreas.pdf?rlkey=lwe0toedrzl6xm122e2i8c4vg&e=1&st=7g3sdgri&dl=0, Accessed 5- 22-2025
Septic Tank: Types, Working Principle, Design, Size, Advantages & Disadvantages, https://testbook.com/civil-engineering/septic-tank-diagram-types, Accessed 6-02- 2025
State of California, Waste Holding Tanks,
https://www.law.cornell.edu/regulations/california/25-CCR-4517.8, Accessed 5-22- 2025
State of Georgia, Code of Georgia Sewage Holding Tanks, https://law.justia.com/codes/georgia/title-12/chapter-15/article-1/section-12-15- 5/, Accessed 5-22-2025
State of Vermont, Potable Water Supply and Wastewater System Permit, https://legislature.vermont.gov/statutes/section/10/064/01979, Accessed 5-22-2025 Texas Commission on Environmental Quality, Types of Municipal Solid Waste Processing and Disposal Facilities, and Wastes That May Be Accepted, https://www.tceq.texas.gov/permitting/waste_permits/msw_permits/wastetypes/msw_types.html, Accessed 6-10-2025 Washington State Department of Health, Department Standards and Guidance for Performance, Application, Design, and Operation & Maintenance: Holding Tank and Incinerator Sewage Systems,
https://doh.wa.gov/sites/default/files/legacy/Documents/Pubs/337-006.pdf, Accessed 5-22-2025
2909
Temporary Sewage Holding
Tank Permit Process
City of Richmond
12 World Health Organization, Guidelines on Sanitation and Health, https://iris.who.int/bitstream/handle/10665/274939/9789241514705-eng.pdf, Accessed 5-22-202
2910
Temporary Sewage Holding
Tank Permit Process
City of Richmond
Appendix A
Keller Beach Sanitary Sewer (KBSS) Moratorium Area
2911
2912
Temporary Sewage Holding
Tank Permit Process
City of Richmond
Appendix B
Building Division Permit Application
2913
Apply On-Line
Scan me
Information above this line is for official use only
Special Flood Hazard Area
Yes No
Obtaining Permits
Scan me
BUILDING DIVISION PERMIT APPLICATION
Job Site Address:
Assessorís Parcel No. (APN):
* Property Owner:
Address:
City/State/Zip:
Email:
Phone/Fax:
* Applicant
Address:
City/State/Zip:
Email:
Phone/Fax:
Contractor:
State License
Number (CSLB):
Address:
City/State/Zip:
Email:
Phone/Fax:
Architect:
Address:
City/State/Zip:
Email:
Phone/Fax:
Engineer:
Address:
City/State/Zip:
Email:
Phone/Fax:
Agent/Tenant:
Address:
City/State/Zip:
Email:
Phone/Fax:
Valuation of Work
(check all that applies)
Building
Electrical
Plumbing
Mechanical
Grading
Underground
Total $
(Fair Market Value of Labor and Materials)
Description of Work
(must be the same applying online)
WHOíS DOING THE WORK!
UNDER STATE LAW, CHECK A LINE THAT
APPLIES CONTRACTORS LICENSE LAW
_____I am licensed under provisions of Chapter 9
Division 3 of the Business & Profession Code
_____I, as the owner, or my employees with wages
as their sole compensation, will do the work and the
structure is not intended or offered for sale (Sec. 7044) _____I, as the owner, am exclusively contracting with
licensed contractors. (Sec. 7044)
_____I am exempt under Section ________Business
and Profession Code for this reason:
Richmond Business License #: __________________
Permit # _____________________
Plan Check # _____________________
Revision # _____________________
I certify that I have read the information on this permit application (both sides) and state that the above information is correct. I agree to comply with all City ordinances and other laws relating to this permit and hereby authorize representatives of the City of Richmond to enter up the above mentioned property for inspection purposes. *When the property owner or applicant is a LLC the Disclosure Statement must also be fully completed.
SIGNATURE: _________________________________________ DATE: ___________________ 450 Civic Center Plaza, 2nd Floor, Richmond, CA 94804 (510) 620-6868 CDD Rev.:09/10/2021 * When the property owner or applicant is a LLC the Disclosure Statement must also be completed * When the property owner or applicant is a LLC the Disclosure Statement must also be completed 2914
UTILITY SERVICES
During the course of construction and until all permits are finaled, the utility services (gas & electrical) to the property will be considered a temporary construction service. In the event a permanent utility service exists, the utility company will be notified that such service is now changed to a temporary construction service. In the event that the work is not finaled and the permit is revoked, utility service will also be discontinued until such time as inspections are completed to determine that the property meets minimum standards to safeguard life or limb, health, property and public welfare.
WHEN PERMIT IS ISSUED
• Inspection record card (or copy) must be posted in a
conspicuous place on the job but protected from the weather. • The stamped set of plan, specifications and other data must be kept on the job site.
• Advance one day notice is required for inspection request. • All contractors on the job must maintain a current
business license, Contractorís license and insurance.
• All employees on the job must be protected with Workerís Compensation insurance.
• You are required to review and follow the stamped set of plans & specifications and understand all building code comments prior to beginning construction.
• A common rule of thumb for inspections is ìnever cover anything until the City Inspector has seen it.î
WORKMANSHIP
In the event that the Building Official determines that the work being done is below industry standards or the persons doing the work are unable to produce work to the industry standards without detailed instructions from the inspector, the work will be considered as involving unusual hazards and the following from the CBC shall be employed.
Inspections,
a) General. All construction or work for which a permit is required shall be subject to inspection by the Building Official, and certain types of construction shall have
continuous inspections by special inspectors as specified in Ch. 17 CBC
Special Inspections
a) General. In addition to the inspections required by Ch. 17 CBC, the Owner shall employ a special inspector during
construction on the Following types of work:
SPECIAL CASES: Work which, in the opinion of the Building Official, involves unusual hazards.(a)Special Inspector. The special inspector shall be a qualified person who shall demonstrate his competence, to the satisfaction of the building Official for inspection of the particular type of construction or operation requiring special inspection.
OSHA PERMITS Calif. Admin Code Sect. 17922.5 requires proof of an OSHA permit prior to the issuance of a building permit when:
1. Trenches or excavations are 5 feet or more in depth into which a person must descend.
2. Construction or demolition of any structure more than 36 feet in height; Title 8, Calif. Code and Safety Orders.
WORKERSí COMPENSATION INSURANCE
California Labor Code Sec. 3800 requires every city to keep on file a certificate of Workersí Compensation Insurance for a permit applicant before any permit can be issued for jobs where persons will be employed to do the permitted work. Employers who have a certificate of consent to self- insure issued by the stateís Director of Industrial Relations may file this in lieu of a certificate of insurance. All certificates must show the City of Richmond as the certificate holder and promise to give the City at least ten days written notice before it is cancelled.
ENGINEER OR ARCHITECT REQUIRED
California Law (Section 5500 & 6700 Business & Professions Code) requires that plans and specifications for building work be signed by a state licensed engineer or architect except for nonstructural remodeling and wood frame residential housing with less than five units and less than three stories in height. Any changes to the plans must be signed off by the engineer or architect prior to beginning work.
PERMITS TO CONTRACTORS
1. For the purpose of issuing permits to contractors the following conditions must be met:
o Valid California Contractors License.
o Current Workmanís Compensation Insurance
certificate on file.
o Valid City of Richmond Business License.
o No outstanding or delinquent debts to the City of
Richmond.
The following may also be required:
2. ìQualifying Individualî or his/her designee must apply for permits.
3. A copy of the part of the contract which shows the contract amount and the ownerís signature authorizing the work. In order to clarify what type of contractors license is required for various permits, the following shall apply:
4. General Engineering (A). Contractors may be issued permits for any and all types of work. Section 830a, 832.62a, 834a, and 7056 of Business and Professions Code.
5. General Building (B). Contractors may be issued permits for any structure and its components (electrical, plumbing, mechanical, etc.) provided the General Contractor is performing or supervising three trades or crafts. Section 830b, 832.62b, 7057 of Business and Profession Code
6. Specialty Contractors (C-3) and General Building Contractors (B) doing framing and carpentry may be issued permits for their specialty trade and work of other trades provided such other work is incidental and supplemental and essential to the specialty work.
Section 831, 832, 834b 834c, 7058, 7059 of the Business and Professions Code.
PERMITS TO OWNERS/TENANTS
For the purpose of issuing permits to property owners or tenants, the following conditions must be met:
1. California required Owner-builder declaration.
2. Proof of ownership or long term lease may be required.
In order to clarify what types of permits may be issued to property owners or tenants, the following section of the Business and professions Code of California State Law shall apply: 7044.
This chapter Contractor License Law) does not apply to any of the following:
An owner of property, building or improving structures thereon, or appurtenances thereto, who does such work himself or herself or through his or her own employees with wages as their sole compensation; provided that such structure/s, with or without the appurtenances thereto is not intended or offered for sale or lease within one year. An owner of property, building or improving structures thereon, or appurtenances thereto, who contracts for such a project with a contractor or contractorís licensed pursuant to this chapter. A homeowner improving his or her principal place of residence or appurtenances thereto, provided that all of the following conditions exist:
1. The work is performed prior to sale.
2. The homeowner has actually resided in the residence for the 12 months prior to completion of the work.
3. The homeowner has not availed him or herself of the
exemption in this subdivision on more than two structures more than once during any three-year period.
NOTE:
(I) Long term lessees are also treated as owner for the purpose of this exemption;
(II) Changes in lessees are also treated as sales of
property for this exemption.
2915
Disclosure Statement for Limited Liability Companies
Whenever the owner of a property or the applicant for a City permit or license is a limited liability company (ìLLCî), the LLC shall provide the City with the names and business addresses of any and all shareholders, directors, officers, members, managers, other authorized persons, partners, and ìBeneficial Ownersî of the applying LLC. A Beneficial Owner is any person or entity who: (1) exercises substantial control over the applying LLC; (2) owns 25% or more of the interest in the applying LLC; or (3) receives substantial economic benefits from the assets of the applying LLC. If any LLC shareholder, director, officer, member, manager, other authorized person, partner, or Beneficial Owner is itself an LLC or other business entity, the names and business addresses must also be provided for any and all shareholders, directors, officers, members, managers, other authorized persons, partners, and Beneficial Owners of that LLC or other business entity all the way up through each entity in the organizational chart until ultimate ownership by individual people is disclosed.
Name: ___________________________________________
Title: ___________________________________________
Address:__________________________________________
Name: ___________________________________________
Title: ___________________________________________
Address:__________________________________________
Name: ___________________________________________
Title: ___________________________________________
Address:__________________________________________
☐ Check this box if additional ownership information is attached to this Disclosure Statement.
In signing this Disclosure Statement, I represent that the information submitted in this Disclosure Statement, and any attachments, is true and correct.
Signature: ________________________
Printed Name: _____________________
Title: __________________________
Date: ___________________________
2916
Temporary Sewage Holding
Tank Permit Process
City of Richmond
Appendix C
Grading Permit
2917
GRADING PERMIT
Application Submittal Checklist
The following materials are required at minimum in order to submit an application for a grading permit..
Additional materials may be required by the City Engineer depending on the complexity of the project.
CITY OF RICHMOND
Engineering Services Department
Ph: (510) 307-8091
Fax: (510) 307-8116
450 Civic Center Plaza
P.O. Box 4046
Richmond, CA 94804
www.ci.richmond.ca.us
ENGINEERING APPLICATION FORM
PLAN CHECK DEPOSIT ($_________________)
GRADING PLANS - Includes Storm Water Control Plans, Erosion & Sediment Control Plans. Four (4) full-size sets ñ Engineering (2), Planning (1) and Stormwater/Wastewater (1) GRADING PURPOSE STATMENT - Explain/justify the proposed grading. GRADING QUANTITY ESTIMATE ñ Provide cut, fill, shrinkage, import, export. SCHEDULE OF WORK - Estimated starting and completion dates for work covered by the permit. PROPOSED HAUL ROUTE - Source of Import or Destination of Export. 8-1/2î by 11î exhibit is acceptable. GEOTECHINCAL/SOILS REPORT ñ (3 copies)
ENGINEERíS COST ESTIMATE & QUANTITIES BREAKDOWN ñ Signed and stamped by engineer (3 copies) CITY OF RICHMOND BUSINESS LICENSE - Copy of developerís business license. INSURANCE CERTIFICATES - Naming the City of Richmond as the Certificate holder. FAITHFUL PERFORMANCE BOND - Based upon the cost of the total number of cubic yards of material moved, plus the cost of all drainage erosion control or other protective devices or work necessary to eliminate geological hazards or to protect persons or public or private property. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) ñ Applies to sites greater than one (1) acre (3 copies). Include State Water Resources Control Board WDID number. STORM WATER CONTROL PLAN (SWCP) ñ Applies to C.3 sites (3 copies). O&M MANUAL AND SPECIFICATIONS - If applicable. (5 Sets) TREE PRESERVATION PLAN - or Letter (by civil engineer or landscape architect) certifying that there are no trees on or near the site.
Additional Project Specific Information Submitted (if required):
Landscape Plan
Tree Survey and Arboristís Report
Biological Study
Hydraulic calculations and hydrology map (3 copies)
Other:
(over)
1 of 2 Rev. 05.26.11
2918
Grading Permit ñ Application Submittal Checklist
2 of 2
Plans prepared by a Civil Engineer, at minimum, shall include:
Vicinity Map (RMC 12.44.030.d.1)
Dimensioned property lines and easements (RMC 12.44.030.d.2,3) Site topography, including existing contours, spot elevations, drainage patterns, and building footprints (including hand topo shots at all conforms, property lines, etc.) (RMC 12.44.030.d.4,5) Elevations, dimensions, location, extent and slopes of all proposed grading shown by contours and other means (RMC 12.44.030.d7)
Plans of all drainage devices, walls, cribbing, dams, etc., to be constructed as part of the grading project (RMC
12.44.030.d.8)
The grading plan must be signed by a registered civil engineer and must be prepared by or under said civil engineer's direction (RMC 12.44.030.d.11)
Existing trees with trunk diameter, tree type, and elevation of the root crown. Trees to be preserved shall be identified and appropriate tree preservation measures included on the plans. Retaining walls, if proposed, shall be shown with top-of-wall and bottom-of-wall elevations Reference to project geotechnical report; landslide repair and slope stability projects shall be reviewed and approved by project geotechnical engineer and/or project geologist. Include the signature of the geotechnical engineer whose report was used in the design of the grading (RMC
12.44.030.d.17)
APPLICANT ACKNOWLEDGEMENT & AUTHORIZATION
I verify that I have submitted all of the required materials for this application. I understand that if any of the required materials listed above are not submitted, an incomplete letter shall be sent to the Applicant and the first plan check will not commence.
X
Signature Date
- ENGINEERING DIVISION USE -
Project:
Location:
Engineer:
Date:
Notes:
2919