STORM WATER POLLUTION PREVENTION 01 35 44 - 2 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION
B. Arrange construction activities to minimize erosion to the maximum practical extent.

Clearing, excavation, and grading shall be limited to those areas of the project site necessary for construction. Minimize the area exposed and unprotected.

C. Clearly mark and delineate the limits of work activities. Do not allow equipment to operate outside the limits of work or to disturb existing vegetation. Complete excavation and grading during the dry season to the maximum extent possible.

1.4 REGULATORY REQUIREMENTS
A. The Contractor shall comply with provisions of Federal, State, and local regulations and requirements that govern the Contractor's operations and storm water and non- storm water discharges from the project site and areas outside the project limits during construction.

B. The project site is more than one acre and therefore requires compliance with the State Water Resources Control Board statewide general permit entitled "Order No. 2009-0009– DWQ (as amended by Order No. 2010-0014-DWQ), National Pollutant Discharge Elimination System General Permit No. CAS000002, Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction and Land Disturbance Activities" (Construction General Permit) that regulates discharges of storm water and nonstorm water from construction activities disturbing one acre or more of land surface, or that are part of a common plan of development. The Construction General Permit is available for review at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/ This project shall conform to applicable provisions of this Permit and modifications thereto.

C. This project lies within the boundaries of the San Francisco Bay Region (2) Regional Water Quality Control Board (SFRWQCB). The SFRWQCB has issued Waste Discharge Requirements and National Pollutant Discharge Elimination System (NPDES) Permit for the discharge of stormwater runoff from the municipal separate storm sewer systems (MS4s) including construction sites (San Francisco Bay Region Municipal Regional Stormwater NPDES Permit Order No. R2-2015-0049 NPDES Permit No. CAS612008 November 19, 2015). The MS4 Regional Stormwater NPDES Permit is available to review at:
https://www.waterboards.ca.gov/sanfranciscobay/water_issues/programs/stormwater /Municipal/R2_2015_0049_amended.pdf
This project shall conform to applicable provisions of this Permit and modifications thereto.

D. Storm Water Pollution Prevention Plan (SWPPP)

1. The SWPPP will include a description of best management practices (BMPs) that will be implemented to reduce the pollutants in stormwater and non-stormwater discharges to assure compliance with the terms and conditions of the Construction

Page 536 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 3 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION
General Permit.

2. A Qualified Stormwater Developer (QSD) shall prepare the SWPPP and a Qualified Stormwater Practitioner shall ensure implementation of the SWPPP.

3. The SWPPP shall include the following information and forms:
a. Site description
b. Expected sequencing of operations and construction schedule c. Weather monitoring procedure
d. Descriptions and details of erosion controls, including dust control e. Erosion control plans
f. Controls for other potential onsite storm water pollutants g. Applicable specifications
h. Maintenance and inspection procedures and forms
i. Description of potential non-storm water discharges at site j. Notice of Intent (NOI) form
k. Notice of Termination (NOT) form
l. QSD/QSP Certification forms
m. Other record keeping forms and procedures
n. Good housekeeping practices and procedures, including vehicle washdown areas, protection of equipment storage and maintenance areas, and sweeping of roadways related to hauling activities

4. The Owner will review the draft SWPPP. Contractor QSD will address Owner review comments and submit revised SWPPP for Owner approval. Upon Owner approval, Contractor QSD and Owner representative will sign the approved SWPPP.

5. Contractor will upload approved SWPPP onto SMARTS database for Notice of Intent (NOI) submittal.

6. When the SWRCB approves the NOI, the SWPPP will be the document in force on the project.

7. Place the SWPPP and all updates in a three-ring binder so that completed inspection forms and other records may be inserted. The Contractor shall maintain a copy of the SWPPP and all associated records and forms on site throughout the construction period.

8. The SWPPP shall be available for public inspection. The Contractor shall notify the Owner immediately upon request from the regulatory agencies to enter, inspect, sample, monitor, or otherwise access the project site or the Contractor's records pertaining to water pollution control work. The Contractor and the Owner shall provide copies of correspondence, notices of violation, enforcement actions, or proposed fines by regulatory agencies to the requesting regulatory agency.

9. Implement the SWPPP as required throughout the construction period and maintain all erosion control elements in proper working order until final acceptance of project.

Page 537 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 4 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION

10. Do not perform clearing and grubbing or earthwork until applicable BMPs have been installed.

11. Prior to construction, the Contractor and all subcontractors shall sign certifications (included in the SWPPP) that they understand the requirements of the Construction General Permit and SWPPP. All Contractor and subcontractor crews shall comply with the requirements of the Construction General Permit under the supervision of the Contractor QSP who will be responsible for implementing the SWPPP. The Contractor QSP shall ensure that emergency procedures and the SWPPP are updated as needed and available for inspection. The SWPPP (including inspection forms) and all data used to complete the NOI shall be provided to the Owner at the completion of the project.

12. SWPPP Inspections and Amendments
a. The Contractor QSP and/or trained crew under QSP supervision will perform weekly inspections of the project site in accordance with the SWPPP. Inspections shall be documented on forms provided in the SWPPP binder. b. It may be necessary to revise the SWPPP during construction to make necessary improvements or to respond to unforeseen conditions noted during construction or site inspections. For that purpose, the SWPPP shall specify the mechanism whereby revisions may be proposed by the Contractor or the Owner and incorporated into the SWPPP, including review and acceptance of minor changes. The Contractor and the Owner will jointly accept and sign each revision to the SWPPP before implementation. Accepted modifications will be implemented within 7 calendar days following the date of the inspection when deficiencies or necessary corrections are first noted.
c. Temporary erosion and pollution control measures shall be used to correct conditions that develop during construction that were not foreseen during design, that are needed prior to installation of permanent control features, or that are needed temporarily to control erosion that developed during normal construction practices but are not associated with permanent control features on the project.
d. Provide additional temporary erosion and pollution controls made necessary by Contractor’s errors or negligence at no additional cost to the Owner.

E. Notice of Intent (NOI)

1. Owner will complete NOI form on SMARTS and submit to SWRCB after accepted SWPPP has been uploaded by Contractor.

2. Annual Reports are due to the SWRCB SMARTS by September 1 of each year. Contractor shall submit Annual Reports and any Ad Hoc Reports onto SMARTS by August 15 for Owner review.

F. Notice of Termination (NOT)
G. Upon final acceptance, the Owner will file the NOT.

Page 538 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 5 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION

1.5 PROJECT CONDITIONS
A. The Contractor shall maintain records of work performed on the sediment control structures.

B. The Contractor shall not remove any erosion or sediment control measure without prior permission from the Owner.

C. The Contractor shall obtain approval from the Owner prior to making changes to erosion control plans.

1.6 SEQUENCE OF CONSTRUCTION
A. The Contractor shall be responsible for arranging and conducting an Erosion and Sediment Control meeting/briefing to inform all parties scheduled to be on-site during the project of the measures to be implemented for proper erosion and sediment control (may be included as part of the preconstruction meeting).

1. Installation of silt fences, storm drain protection, and all other forms of erosion and sediment control shall not begin until after this meeting has occurred.

B. The Contractor shall notify the Owner in writing and by telephone of the following events:

1. The required erosion and sediment control meeting/briefing.

2. Following installation of required sediment control structures.

3. Prior to removal of or modification to sediment control structures.

4. Prior to removal of all sediment control structures.

C. Silt fences, storm drain protection, and all other forms of erosion and sediment control shall be installed, inspected, and accepted by the Contractor before beginning any utility excavation.

D. Temporary silt fences shall be installed around any stockpiles and/or excavated material that cannot be backfilled during the same day in which it was excavated.

Temporary silt fences shall also be placed immediately downstream of any utility trench that has not been backfilled at the end of the working day. Temporary silt fences shall be installed prior to leaving the work site for the day.

E. Silt fences and storm drain protection shall be inspected by the Contractor weekly.

Repairs to these devices shall be completed prior to leaving the work site for the day.

F. The Contractor shall prevent the deposition of materials onto paved areas. The Contractor shall inspect the paved areas for deposited materials weekly and remove the materials immediately.

G. Silt fences shall be removed with permission of the Owner within 20 working days

Page 539 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 6 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION
after final acceptance of the project and/or after the establishment of permanent stabilization of all excavations and fill areas.

PART 2 - PRODUCTS

2.1 EQUIPMENT
A. Before the work begins, sufficient equipment shall be available on the site to assure that the operation and adequacy of the erosion control plans can be continuously maintained.

2.2 EROSION CONTROL MEASURES
A. Erosion control measures shall consist of silt fencing or equivalent (eg. wattles, etc.), barrier protectors, straw bales, temporary soil retention blankets, excelsior drainage filters, sediment traps and berms.

B. Berms and excelsior drainage filters shall be used to form sediment traps and to control run- on and run-off into other areas, including creeks, streams, marshes, access roads, well areas, and the staging areas.

C. Erosion control measures shall be used to contain only direct precipitation in the construction zone. The contained water shall be allowed to percolate into the ground or drain slowly through the drainage filter sediment traps.

D. Earthen sediment traps or holding ponds shall not be used unless accepted by the Owner.

PART 3 - EXECUTION

3.1 GENERAL DESCRIPTION
A. Furnish, install, maintain, and operate necessary control measures and other equipment necessary to prevent erosion to the maximum extent practical, including implementation of Best Management Practices (BMPs).

1. Temporary measures shall be to Contractor's own design and Contractor shall be solely responsible for risks related to the management of erosion control during construction.

B. Effective measures shall be initiated prior to the commencement of clearing, grading, excavation, or other operations that will disturb the natural erosion protection.

C. Schedule work to expose areas subject to erosion for the shortest possible time, and preserve natural vegetation to the greatest extent practicable. Temporary storage and construction buildings shall be located, and construction traffic routed, to minimize erosion.

Temporary fast-growing vegetation or other suitable ground cover shall be provided as necessary to control runoff.

Page 540 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 7 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION

3.2 METHODS
A. Construct berms to reduce runoff velocity as well as direct surface runoff around and away from all fuel containment, storage, and borrow areas.

B. Divert surface runoff around and away from cut and fill slopes by constructing berms or ditches at the base of disturbed slopes. Provide conveyance for the runoff in temporary pipes or protected channels to temporary sediment traps.

C. Place drainage filters around all catch basins to create sediment traps to control run- off from the construction area.

D. Excess water used for dust control shall be contained within the demolition areas by the erosion control measures.

3.3 MAINTENANCE OF TEMPORARY FACILITIES
A. Inspect erosion and sediment control structures weekly. Ensure erosion and sediment control structures remain effective throughout excavation and grading operations.

Relocate structures as necessary.

B. Inspect control structures after each significant rainfall. Promptly repair breaches which occur.

C. The Contractor shall remove entrapped sediment from behind excelsior drainage filter after each storm.

3.4 DISPOSAL OF SEDIMENT FROM STORM WATER POLLUTION CONTROL

STRUCTURES
A. Sediment excavated from temporary sediment control structures shall be disposed on the site with general fill, or with topsoil. Sediment shall be allowed to dry out as required before reuse.

B. Contractor shall place the sediment removed from traps and other structures where it will not enter a storm drain or watercourse and where it will not immediately reenter the basin.

3.5 REMOVAL OF TEMPORARY STORM WATER POLLUTION CONTROL

MEASURES
A. All temporary control measures shall be removed with permission of the Owner within 20 working days after final acceptance of the Project or once grading is completed and slopes have stabilized.

Page 541 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 8 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION
SWPPP Contents
a. SWPPP Certifications and Approval
b. Risk Level
c. Table of Contents
d. Qualified SWPPP Developer
e. Legally Responsible Person
f. Amendment Log
g. SWPPP Requirements
• Permit registration documents
• SWPPP availability and implementation
• SWPPP amendments
• Retention of records
• Required non-compliance reporting
• Annual report
• Changes to permit coverage
• Notice of Termination
h. Project Information
• Site description
• Existing conditions
• Existing drainage
• Geology and groundwater
• Project description
• Developed condition
• Permits and governing documents
• Stormwater run-on from off-site areas
• Findings of the construction site sediment and receiving water risk determination
• Construction schedule
• Potential construction activity and pollutant sources • Identification of non-stormwater discharges
• Required site map information
i. Best Management Practices
• Schedule for BMP implementation
• Erosion and sediment control
• Non-stormwater controls and waste and materials management • Post-construction stormwater management measures
j. BMP inspection and maintenance
• Rain Event Action Plans
k. Training
l. Responsible parties and operators
• Responsible parties

Page 542 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 9 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION
• Contractor list
m. Construction Monitoring Program
• Weather and rain event tracking
• Monitoring locations
• Safety and monitoring exemptions
• Visual monitoring
• Routine observations and inspections: Routine BMP inspections, Nonstormwater discharge observations • Rain-event triggered observations and inspections: Visual observations prior to a forecasted qualifying rain event, BMP inspections during an extended storm event, Visual observations following a qualifying rain event • Visual monitoring procedures
• Visual monitoring follow-up and reporting
• Visual monitoring locations
• Water quality sampling and analysis
• Sampling and analysis plan for non-visible pollutants in stormwater runoff discharges: Sampling scheduled, sampling locations, monitoring preparation, analytical constituents, sample collection, sample analysis, data evaluation and reporting
• Sampling and analysis plan for pH and turbidity and stormwater runoff discharges: Sampling schedule, sampling locations, monitoring preparation, field parameters, sample collection, field measurements, data evaluation and reporting
• Sampling and analysis plan for non-stormwater discharges: Sampling schedule, sampling locations, monitoring preparation, analytical constituents, sample collection, sample analysis, data evaluation and reporting
• Additional monitoring following an NEL exceedance
• Training of sampling personnel
• Sample collection and handling
• Sample documentation procedures
• Records retention
n. Attachments
• Construction General Permit
• Risk Level calculations
• Water Pollution Control Drawings
• Permit Registration Documents/Amendments
• QSD/QSP Certifications
• SWPPP Amendment Certifications
• Construction Schedule

Page 543 of 1236 ends

STORM WATER POLLUTION PREVENTION 01 35 44 - 10 of 10
SECTION 01 35 44 STORM WATER POLLUTION PREVENTION
• Construction Activities, Materials Used, and Associated Pollutants • CASQA Stormwater BMP Handbook Portal: Construction Fact Sheets • BMP Inspection Form
• Training Reporting Form
• Weather forecast reports
• Monitoring records
• Field meter instructions

END OF SECTION

Page 544 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 1 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-assurance and control services required by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section.

3. Specific test and inspection requirements are not specified in this Section.

1.2 DEFINITIONS
A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect.

C. Mockups: Full-size, physical assemblies that are constructed on-site. Mockups are used to verify selections made under sample submittals, to demonstrate aesthetic effects and, where indicated, qualities of materials and execution, and to review construction, coordination, testing, or operation; they are not Samples. Approved mockups establish the standard by which the Work will be judged.

D. Laboratory Mockups: Full-size, physical assemblies that are constructed at testing facility to verify performance characteristics.

E. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

F. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities

Page 545 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 2 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS
having jurisdiction, to establish product performance and compliance with industry standards.

G. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

H. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

I. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

J. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." It also does not imply that requirements specified apply exclusively to Tradespeople of the corresponding generic name.

K. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of five previous projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction. See specific specification sections for additional experience requirements.

1.3 CONFLICTING REQUIREMENTS
A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement as defined in the General Conditions. Refer uncertainties and requirements that are different, but apparently equal, to Architect for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.

To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.

1.4 SUBMITTALS
A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

Page 546 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 3 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS
B. Reports: Prepare and submit certified written reports that include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and re-inspecting.

C. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.5 QUALITY ASSURANCE
A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or products that are similar to those indicated for this Project in material, design, and extent.

Page 547 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 4 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS
F. Specialists: Certain sections of the Specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirement for specialists shall not supersede building codes and regulations governing the Work.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 548; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.

2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory Accreditation Program.

H. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

I. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

1. Build mockups in location and of size indicated or, if not indicated, as directed by Architect.

2. Notify Construction Manager seven (7) days in advance of dates and times when mockups will be constructed.

3. Demonstrate the proposed range of aesthetic effects and workmanship.

4. Obtain Architect's approval of mockups before starting work, fabrication, or construction.

5. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

6. Demolish and remove mockups when directed, unless otherwise indicated.

J. Laboratory Mockups: Comply with requirements of preconstruction testing and those specified in individual Sections in Divisions 02 through 48.

1.6 QUALITY CONTROL
A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.

Page 548 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 5 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor (contract sum adjusted through change order procedures).

B. Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.

1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services. a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.

2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections.

D. Retesting/Re-inspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

E. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar qualitycontrol service through Contractor.

5. Does not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform any duties of Contractor.

Page 549 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 6 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS
F. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Delivery of samples to testing agencies.

6. Preliminary design mix proposed for use for material mixes that require control by testing agency.

7. Security and protection for samples and for testing and inspecting equipment at Project site.

G. Coordination: Coordinate sequence of activities to accommodate required qualityassurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

1.7 SPECIAL TESTS AND INSPECTIONS
A. Special Tests and Inspections: Owner will engage a qualified testing agency, special inspector and/or Essential Services Inspector to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Owner, and as follows:

1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures and reviewing the completeness and adequacy of those procedures to perform the Work.

2. Notifying Architect and Contractor promptly of irregularities and deficiencies observed in the Work during performance of its services.

3. Submitting a certified written report of each test, inspection, and similar quality- control service to Architect with copy to Contractor and to authorities having jurisdiction.

4. Submitting a final report of special tests and inspections at Substantial Completion, this includes a list of unresolved deficiencies.

5. Interpreting tests and inspections and stating in each report whether tested and inspected work complies with or deviates from the Contract Documents.

6. Retesting and reinspecting corrected work.

PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG
A. Test and Inspection Log: Prepare a record of tests and inspections. Include the

Page 550 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 7 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS
following:

1. Date test or inspection was conducted.

2. Description of the Work tested or inspected.

3. Date test or inspection results were transmitted to Architect.

4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Architect's and Construction Manager's reference during normal working hours.

3.2 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible.

2. Comply with the Contract Document requirements for "Cutting and Patching." B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION

Page 551 of 1236 ends

QUALITY REQUIREMENTS 01 40 00 - 8 of 8
SECTION 01 40 00 QUALITY REQUIREMENTS

PAGE INTENTIONALLY LEFT BLANK

Page 552 of 1236 ends

MOCK-UPS 01 43 39 - 1 of 2
SECTION 01 43 39 MOCK-UPS
2 PART 1 – GENERAL

1.1 MOCK-UP SUMMARY
A. Mock-ups will be used to review of appearance, quality of workmanship, coordination, compatibility, and relationships with adjacent materials. Unless otherwise specifically indicated mock-ups shall be constructed in place at location directed by Architect.

Approved mock ups may remain as part of the work.

1.2 SUBMITTALS
A. Mock-ups shall not be fabricated until after acceptance of required submittals for all materials to be incorporated into the mock-ups. This means that the Project schedule shall take into account early submittal of these components to the Architect.

B. Samples: Prior to construction of mock-ups, provide samples as specified in the respective Specification Sections included as part of the mock-ups.

1.3 QUALITY ASSURANCE
A. Design Concept: Mock-up requirements are intended to establish function, workmanship, finish, and color for conformance with the architectural design intent.

B. Purpose: To verify suitability of colors, finishes, and satisfactory integration of building materials and components indicated and required.

C. Performance: Mock-ups shall be constructed for the Architect’s review for compliance with the Contract Documents and shall be used as a standard for the final installation.

D. Make necessary additions and modifications to mock-ups as directed by the Architect.

E. Modify mock-ups, or construct or install new components if requested by the Architect, until final acceptance is obtained.

F. Mock-ups shall serve as the standard for subsequent work of like kind after approval by the Architect. Be prepared, at no additional cost to the Owner, to make as many modifications as required to achieve mock-ups that are acceptable to the Architect and of sufficient quality to serve as the standard for the complete Project.

G. Following acceptance, mock-ups shall serve as a performance standard of quality and appearance of the work it represents, including the interface with adjacent

Page 553 of 1236 ends

MOCK-UPS 01 43 39 - 2 of 2
SECTION 01 43 39 MOCK-UPS
2 materials and components as applicable.

H. Coordinate fabrication, delivery, assembly, and installation with related materials to be included in the mock-ups. Construction of the mock-up assemblies shall be under the supervision of the same personnel who will be employed for the subsequent work.

I. Maintain mock-ups in neat, clean condition until removal or final acceptance. Repair damage as required to maintain in condition suitable for review and approval.

J. Scheduling:

1. Construct mock-ups in a timely manner to permit review and modifications such that the work is not delayed.

2. Do not proceed with ordering of components or construction subject to mockup approval until after approvals have been obtained.

3. Provide the Architect not less than 10 working days notice of the time each component is ready for review.

4. Include line item in the construction schedule for the building section mockup, showing submittals, construction, review, and approval periods.

PART 2 – PRODUCTS

2.1 MATERIALS
A. As specified in the respective Sections of the Specifications.

PART 3 – EXECUTION

3.1 EXTERIOR BUILDING MOCK-UP
A. Provide building mock-up of building area indicated where directed by the Architect.

B. Purpose: Establish standards for work indicated and specified to be included in mockups to demonstrate quality of workmanship, materials, colors, and textures required by the Contract Documents. Include roof, roof overhang, soffits, windows, doors, glazing, sealants, siding and cladding, flashings, and other exterior materials.

1. Mock-up will be used by the Architect to test color and material alternatives and to approve final colors, textures, and workmanship.

2. Interior finishes will not be required to be installed on the interior side of the exterior building mock-up.

END OF SECTION

Page 554 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes requirements for temporary fencing, utilities, support facilities, and security and protection facilities.

1.2 DEFINITIONS
A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is complete, insulated, and weather tight; exterior walls are insulated and weather tight; and all openings are closed with permanent construction or substantial temporary closures.

1.3 USE CHARGES
A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum.

Allow other entities to use temporary services and facilities without cost, including, but not limited to, Owner's construction forces, Construction Manager, Architect, occupants of Project, testing agencies, and authorities having jurisdiction.

B. Water Service: Water from Owner's existing water system is not available for use without metering and without payment of use charges. Contractor is responsible for coordination of this activity with the local municipality.

C. Electric Power Service: Contractor to provide connections and extensions of services as required for construction operations including the office trailers. Contractor will be responsible to coordinate and make arrangements with PG&E to provide temporary power to the construction site. Contractor will be responsible for all costs associated with the installation of temporary power and any and all use charges for the duration of the contract.

Contractor shall provide temporary power as required to allow for operation of office trailers, construction power and new modular building. Temporary power from PG&E is available in the immediate area of the site, contractor shall pursue engineering and installation of temporary power at their own cost.

D. Internet Service/Data: Temporary hardwired service is not currently available in the immediate area of the site, but contractor may pursue engineering and installation of temporary hardwired service at their own cost. Contractor may need to pursue other options to meet the contractual temporary service requirements (satellite, etc.).

E. Temporary Fencing: Contractor to provide temporary fencing at the perimeter of the project site with adequate protection provided to pedestrians outside of the project site. If there is any exposure to falling objects outside of the project site then the Contractor must provide a covered walkway. Contractor shall comply with FAA Orders and Standards for temporary fencing installed at airside (aircraft parking areas). Contractor shall install fencing to secure FAA Parking areas near ATCT during work at ATCT parking lots.

1.4 SUBMITTALS
A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel and Construction Managers.

B. Erosion- and Sedimentation-Control Plan: Show compliance with requirements of EPA

Page 555 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 2 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
Construction General Permit or authorities having jurisdiction, whichever is more stringent.

C. Fire-Safety Program: Show compliance with requirements of NFPA 241 and authorities having jurisdiction. Indicate Contractor personnel responsible for management of fire prevention program.

1.5 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.

1.6 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner’s acceptance, regardless of previously assigned responsibility.

PART 2 - PRODUCTS

2.1 MATERIALS
A. Temporary Chain-Link Fencing: Minimum 2-inch, 9-gage, galvanized steel, chain-link fence with privacy screening fabric mesh; minimum 6 feet high (8 feet at airside) with galvanized steel pipe posts; minimum 2-3/8-inch- OD line posts and 2-7/8-inch- OD corner and pull posts, with 1-5/8-inch- OD top and bottom rails. Galvanized Steel posts will be required to be driven into the ground for support and stability or portable fencing, if appropriate, with sufficient hold down weight to prevent overturning.

2.2 TEMPORARY FACILITIES FOR PROJECT SITE
A. Field Offices for each site, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.

B. Field Offices: Provide and maintain for the duration of the Work temporary offices on site for use by the Contractor and a separate onsite trailer for use by the Owner’s representatives (including Owner, Construction Manager and the Architect).

1. Owner’s Representative. This office shall be a self-contained construction trailer, minimum size 10’ X 44’, and shall be set up with an office at one end and an area for plans. The office will include a desk (minimum size of 30” X 60”), a rolling office chair and two (2) guest chairs. The plan area furnishings will include a 30” X 72” folding table, a small table with a coffee maker, (1) microwave, (1) mini refrigerator, (4) folding chairs, a plan table, a rolling plan rack, two trashcans, three (3) lockable 4 drawer filing cabinets, water cooler, fire extinguisher, smoke detector, and a complete set of unmarked Contract Documents for the Owner’s Representative’s use. The office shall also be equipped with a scanner/copier/printer and a dedicated data line. Two (2) dedicated parking spaces will be provided for use by the Construction Manager’s staff.

2. Offices shall be equipped with secure wireless internet capabilities to allow for onsite users access to email and the internet.

Page 556 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS

3. Offices shall be provided with a door and lock with security bar and a window with a minimum size of 4 feet x 3 feet and security screen. Provide and maintain an electric heater and air conditioning along with adequate electric lighting for each office.

C. Office Supplies: The Contractor shall supply the field office of the Owner’s Representative with (2) cases of 8-1/2 x 11 paper, (1) case of 11 x 17 paper, (1) box post-it notes, (1) box white-out tape, (1) stapler with staples, (1) box assorted binder clips, (1) box paperclips, (1) box of pens, (1) box of pencils, Printer/Copier Toner or Ink, (2) surge protectors, (1) 24’ extension cord, (2) water cooler bottles, (1) box coffee cups, coffee, (3) rolls paper towels.

Supplies shall be restocked monthly and/or on an as-needed basis.

D. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations.

E. Temporary Field Fencing: Provide fence size, material and privacy screen fabric mesh to encompass each site, furnish and installed, equipped for entrance of utility trucks (16- foot gates) and man gates for easy access.

F. Network Setup: The network shall have the following requirements:

1. The internet connection must be separate service and independent of the Contractor’s and shall be the fastest speed available in the area with a minimum a 20- Meg upload / 20-Meg download speed. This should be accomplished via a hardwired connection. a. Wired network connections must be provided at
1) The Office, Planroom, and the Printer/Scanner.
b. Reasonable access to power for the equipment must be provided.

2. If it is necessary to “piggyback” off of an existing hard-wired line, the line provided to the Owner’s Representative shall be an unfiltered line, with no limitations set by the main line holder, such as access restrictions or DNS port blocking.

3. In the cases where a hard-wired connection is not available, the wireless connection provided must meet the same speed needs of 20-Meg upload / 20-Meg download. It shall also be of sufficient bandwidth to meet the needs of the staff.

4. In the case of sites where the internet speeds do not meet the above requirements, a cellular “hot-spot” is to be provided if resulting in a faster connection, along with a local storage device must be provided for the location to save the project data. The local storage device will be connected to the Kitchell network, and backed up during non-business hours to the Kitchell network server.

2.3 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary use during construction, provide filter with MERV of 8 at each return air grille in system and remove at end of construction.

Page 557 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 4 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION FOR PROJECT SITE
A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Electrical Power and Lighting:

1. Contractor will furnish and pay for power during the course of the work to the extent power is not in the building(s) or on the Site. Contractor shall be responsible for providing temporary facilities required on the Site to point of intended use.

2. Contractor shall furnish, wire for, install and maintain temporary electrical lights wherever it is necessary to provide illumination for the proper performance and/ or observe of the Work: a minimum of 20 foot-candles for rough work and 50 footcandles for finish work.

3. Contractor shall be responsible for maintaining existing lighting levels in the Project vicinity should temporary outage or service interruptions occur.

C. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.

1. Connect temporary sewers to municipal system as directed by authorities having jurisdiction. Coordination is the responsibility of the Contractor.

D. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction and modular passenger terminal.

E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities. Provide connection to existing sanitary sewer for temporary passenger terminal modular.

F. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.

G. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.

H. Electric Power Service: It is the Contractor’s responsibility to coordinate with PG&E to obtain the temporary electrical service, including submission of services applications, load calculation, and single line diagrams. The Contractor will also be responsible for payment of

Page 558 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 5 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
the monthly PG&E invoices and all other temporary requirements as outlined within the specification section.

Contractor shall provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations including office trailers.

1. See Section 1.3.C
I. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.

1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.

3.3 Temporary Controls
A. Noise Control

1. Contractor acknowledges that adjacent facilities may remain in operation during all or a portion of the Work, and it shall take all reasonable precaution to minimize noise as required by applicable lass and the Contract Documents.

2. Notices of proposed noisy operations, including without limitation, operation of pneumatic demolition tools, concrete saws, and other equipment, shall be submitted to the City a minimum of forty-eight (48) hours in advance of their performance.

Contractor responsible for obtaining all permits required for construction noise outside of the times allowable within the noise ordinance.

3. Contractor to meet the Conditions of Approval related to Noise Control as defined in the Contract Documents.

B. Noise and Vibration

1. Equipment and impact tools shall have intake and exhaust mufflers.

2. Contractor shall cooperate with the City to minimize and /or cease the use of noisy and vibratory equipment if that equipment becomes objectionable by its longevity.

3. Contractor to meet the Conditions of Approval related to noise and vibration as defined in the Contract Documents.

C. Dust and Dirt

1. Contractor shall conduct demolition and construction operations to minimize the generation of dust & dirt, and prevent dust and dirt from interfering with the progress of the Work and from accumulating in the Work and adjacent areas including, without limitation, occupied facilities.

2. Contractor shall periodically water exterior demolition and construction areas to minimize the generation of dust and dirt.

3. Contractor shall ensure that all hauling equipment and trucks carrying loads of soil and debris shall have their loads sprayed with water or covered with tarpaulins, and as otherwise required by local and state ordinance.

4. Contractor shall prevent dust and dirt from accumulating on walks, roadways, parking areas, and planting, and from washing into sewer and storm drain lines.

5. Contractor to meet the Conditions of Approval related to dust and dirt as defined in the Contract Documents.

6. Comply with FAA Orders and Standards.

3.4 SUPPORT FACILITIES INSTALLATION
A. General: Comply with the following:

1. Provide incombustible construction for offices, shops, and sheds located within

Page 559 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 6 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
construction area or within thirty (30) feet of building lines. Comply with NFPA 241.

2. Maintain support facilities until near Substantial Completion. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Owner.

B. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas within construction limits indicated on Drawings.

1. Provide dust-control treatment that is nonpolluting and non-tracking. Reapply treatment as required to minimize dust.

C. Temporary Roads and Paved Areas: All areas are currently paved.

D. Traffic Controls: Comply with requirements of authorities having jurisdiction.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

E. Parking: Contractor is to provide temporary parking for construction personnel within confines of the designated construction site. If parking within the designated construction site becomes unavailable due to number of Trades, Subcontractors and Vendors, Contractor shall be responsible for coordinating with the City, or local jurisdiction for parking requirements, locations, permits, shuttle services, etc. Contractor is to review and follow all related Conditions of Approval, Laws and Regulations from the City of Ukiah.

F. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction. Maintain Project site, excavations, and construction free of water. (refer to demolition drawings for specifics)

1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities.

G. Project Identification and Temporary Signs: Provide Project identification and other signs as indicated on drawings or required by the County or the City. Install signs where indicated to inform public and individuals seeking entrance to Project. Unauthorized signs are not permitted.

1. Provide temporary, directional signs for construction personnel and visitors.

2. Maintain and touchup signs so they are legible at all times.

H. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

3.5 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to adjacent properties and walkways, according to requirements of authorities having jurisdiction.

C. Stormwater Control: Comply with authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater

Page 560 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 7 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
from heavy rains.

D. Pest Control: Engage pest-control service to recommend practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion. Obtain extended warranty for Owner. Perform control operations lawfully, using environmentally safe materials.

E. Temporary Site Enclosure Fence: All costs associated with the install, monthly fencing rental fees and demobilization of the fencing will be the responsibility of the contractor. Furnish and install any additional site enclosure fence panels in a manner that will prevent people and animals from easily entering site except by entrance gates.

1. Temporary Fence: As required to enclose entire Project site or portion determined sufficient to accommodate construction operations and protection of the public.

Operations include temporary offices, parking, staging areas, actual construction site.

F. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Contractor is responsible to ensure that the fencing and all gates are secured and locked prior to leaving the site on a daily basis to prevent unauthorized entrance, vandalism, theft, and similar violations of security.

G. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

H. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weather-tight enclosure for building exterior.

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.

2. Insulate partitions to provide noise protection to occupied areas.

3. Seal joints and perimeter. Equip partitions with dustproof doors and security locks.

4. Protect air-handling equipment.

5. Weather strip openings.

6. Provide walk-off mats at each entrance through temporary partition.

I. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA 241.

1. Smoking is prohibited in all construction areas.

2. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of authorities having jurisdiction.

3. Develop and supervise an overall fire-prevention and -protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.

4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning sign stating that hoses are for fire-protection purposes only and are not to be removed. Match hose size with outlet size and equip with suitable nozzles.

3.6 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and

Page 561 of 1236 ends

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 8 of 8
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.

C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are property of Contractor.

Owner reserves right to take possession of Project identification signs.

2. At Substantial Completion, clean and renovate permanent facilities used during construction period. Comply with final cleaning requirements specified in Division 01 Section "Closeout Procedures."

END OF SECTION

Page 562 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 1 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout.

2. Field engineering and surveying.

3. General installation of products.

4. Cutting and patching.

5. Progress cleaning.

6. Starting and adjusting.

7. Protection of installed construction.

8. Correction of the Work.

1.2 SUBMITTALS
A. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

B. Certificates: Submit certificate signed by land surveyor certifying that location and elevation of improvements comply with requirements.

C. Survey reports and plots as detailed below.

1.3 QUALITY ASSURANCE
A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.

B. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as

Page 563 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 2 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS
intended or that results in increased maintenance or decreased operational life or safety.

1.4 EXAMINATION
A. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; and underground electrical services.

2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.

B. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

2. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

3. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

4. Proceed with installation only after unsatisfactory conditions have been corrected.

Proceeding with the Work indicates acceptance of surfaces and conditions.

1.5 PREPARATION
A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements as required to fit the Work properly.

Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

Page 564 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 3 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS

1.6 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.

B. General: Engage a land surveyor to lay out the Work using accepted surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.

2. Establish limits on use of Project site.

3. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.

4. Inform installers of lines and levels to which they must comply.

5. Check the location, level and plumb, of every major element as the Work progresses.

6. Notify Architect when deviations from required lines and levels exceed allowable tolerances.

7. Close site surveys with an error of closure equal to or less than the standard established by authorities having jurisdiction.

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations.

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels.

Level foundations and piers from two or more locations.

E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect.

1.7 FIELD ENGINEERING
A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.

B. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark.

1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents.

Page 565 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 4 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS
C. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles, and elevations of construction and sitework.

D. Final Property Survey: Prepare a final property survey showing significant features (real property) for Project. Include on the survey a certification, signed by land surveyor, that principal metes, bounds, lines, and levels of Project are accurately positioned as shown on the survey.

1. Recording: At Substantial Completion, have the final property survey recorded by or with authorities having jurisdiction as the official "property survey."

1.8 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.

3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.

G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.

2. Allow for building movement, including thermal expansion and contraction.

3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry.

Deliver such items to Project site in time for installation.

Page 566 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 5 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS
H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

1.9 CUTTING AND PATCHING
A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties
C. Temporary Support: Provide temporary support of work to be cut.

D. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

E. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will minimize evidence of patching and refinishing.

F. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

1.10 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold materials more than seven (7) days during normal weather or three (3) days if the temperature is expected to rise above 80 deg F.

Page 567 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 6 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly.

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

J. Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

1.11 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.

B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation.

C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

Page 568 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 7 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS

1.12 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

B. Comply with manufacturer's written instructions for temperature and relative humidity.

1.13 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. Comply with requirements "Cutting and Patching."

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

B. Restore permanent facilities used during construction to their specified condition.

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)

END OF SECTION

Page 569 of 1236 ends

EXECUTION REQUIREMENTS 01 73 00 - 8 of 8
SECTION 01 73 00 EXECUTION REQUIREMENTS

PAGE INTENTIONALLY LEFT BLANK

Page 570 of 1236 ends

CUTTING AND PATCHING 01 73 29 – 1 of 4
SECTION 01 73 29 CUTTING AND PATCHING
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes procedural requirements for cutting and patching.

B. See Divisions 2 through 48 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.

1.2 SUBMITTALS
A. Cutting and Patching Proposal: Submit a proposal describing procedures at least 10 days before the time cutting and patching will be performed, requesting approval to proceed.

Include the following information:

1. Extent: Describe cutting and patching, show how they will be performed, and indicate why they cannot be avoided.

2. Changes to In-Place Construction: Describe anticipated results. Include changes to structural elements and operating components as well as changes in building's appearance and other significant visual elements.

3. Products: List products to be used and firms or entities that will perform the Work.

4. Dates: Indicate when cutting and patching will be performed.

5. Utility Services and Mechanical/Electrical Systems: List services/systems that cutting and patching procedures will disturb or affect. List services/systems that will be relocated and those that will be temporarily out of service. Indicate how long services/systems will be disrupted.

6. Structural Elements: Where cutting and patching involve adding reinforcement to structural elements, submit details and engineering calculations showing integration of reinforcement with original structure.

7. Architect's Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later require removal and replacement of unsatisfactory work.

1.3 QUALITY ASSURANCE
A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.

B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that result in increased maintenance or decreased operational life or safety.

C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, and result in

Page 571 of 1236 ends

CUTTING AND PATCHING 01 73 29 – 2 of 4
SECTION 01 73 29 CUTTING AND PATCHING
reducing their capacity to perform as intended, or that result in increased maintenance or decreased operational life or safety.

D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

PART 2 - PRODUCTS

2.1 MATERIALS
A. General: Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.

1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers.

2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect in-place construction during cutting and patching to prevent damage.

Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.

Page 572 of 1236 ends

CUTTING AND PATCHING 01 73 29 – 3 of 4
SECTION 01 73 29 CUTTING AND PATCHING

3.3 PERFORMANCE
A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.

4. Excavating and Backfilling: Comply with requirements in applicable Division 31 Sections where required by cutting and patching operations.

5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

6. Proceed with patching after construction operations requiring cutting are complete.

C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

4. Ceilings: Patch, repair, or re-hang in-place ceilings as necessary to provide an evenplane surface of uniform appearance.

5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition.

Page 573 of 1236 ends

CUTTING AND PATCHING 01 73 29 – 4 of 4
SECTION 01 73 29 CUTTING AND PATCHING
D. Cleaning: Clean areas and spaces where cutting and patching are performed.

Completely remove paint, mortar, oils, putty, and similar materials.

END OF SECTION

Page 574 of 1236 ends

CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 1 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
PART 1 - GENERAL

1.1 SUMMARY – WASTE MANAGEMENT GOALS
A. Section includes administrative and procedural requirements for salvaging, recycling and disposing of nonhazardous demolition and construction waste.

B. The Owner has established that this Project shall generate the least amount of waste possible and processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors shall be employed.

C. Of the inevitable waste that is generated, as many of the waste materials as economically feasible shall be reused, salvaged, or recycled. Waste disposal in landfills shall be minimized.

1.2 DEFINITIONS
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.

C. Disposal: Removal of off-site waste and subsequent sale, recycling, reuse or deposit in landfill or incinerator acceptable to authorities having jurisdiction.

D. Hazardous: Exhibiting the characteristics of hazardous substances, i.e., ignitability, corrosivity, toxicity or reactivity.

E. Recyclable: The ability of a product or material to be recovered at the end of its life cycleand remanufactured into a new product for reuse by others.

F. Recycle: Recovery of waste from the Project site to another site for subsequent processing in preparation for reuse
G. Recycling: The process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for the purpose of recycling. Recycling does not include burning, incinerating, or thermally destroying waste.

H. Salvage: To remove a waste material from the Project site for subsequent sale or reuse in another facility.

Page 575 of 1236 ends

CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 2 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
I. Salvage and Reuse: Recovery of waste and subsequent incorporation into the Work

1.3 PERFORMANCE REQUIREMENTS
A. Develop and implement a waste management program resulting in an end-of-project rates for salvage/recycling of minimum 65 percent by weight or volume of the total waste generated by the project. Refer the Contra Costa Cal Green Construction and Demolition.

Debris Recovery Program and follow the CalGreen Applicant Instructions (https://www.contracosta.ca.gov/DocumentCenter/View/61489/CalGreenApplicant- Instructions---Non-Residential-Projects?bidId=).

B. Regulations: The Contractor shall be responsible for knowing and complying with regulatory requirements, Federal, State, and Local, pertaining to legal disposal of all construction and demolition waste materials.

C. Coordination: Coordinate the recycling of materials with Owner and Subcontractors as required to conform to the Construction Waste Management Plan.

D. Site Access and Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Waste Management Meetings: Conduct on-site waste management meetings with all subcontractors. Review and discuss the waste management plan, methods, procedures and each party’s roles and responsibilities.

C. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.

D. Packing and Shipping

1. Shipping: Coordinate the schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

2. Packing: Arrange for the return of packing materials, such as wood pallets, where economically feasible.

E. Handling

1. Provide equipment and personnel to handle products by methods to prevent soiling or damage.

2. Promptly inspect shipments to assure products comply with requirements, quantities are correct, and products are undamaged.

3. Promptly return damaged shipments or incorrect orders to manufacturer for

Page 576 of 1236 ends

CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 3 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
credit or refund.

F. Storage: Store products in accordance with manufactures recommendations and periodically inspect to assure that stored products are undamaged and are maintained under required conditions.

G. Preparation

1. Storage and Protection:
a. Designate receiving/storage areas for incoming material to be delivered according to installation schedule and to be placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. b. Store and handle materials in a manner as to prevent loss from weather and other damage. Keep materials covered and off the ground, and store in a dry, secure area.
c. Prevent contact with material that may cause corrosion, discoloration, or staining.
d. Protect all materials and installations from damage by the activities of other trades.

H. Waste Management

1. Source separated waste: Separate, store, protect, and handle at the site identified recyclable and salvageable waste products in order to prevent contamination of materials and to maximize recyclability and salvageability of identified materials.

2. Comingled Waste: Waste may be commingled at the site and separated at a recycling facility.

3. Return: Set aside and protect missed-delivered and substandard products and materials and return to supplier for credit.

4. Reuse and Salvage: Set aside, sort, and protect separated products and materials for collection, re-use on site by contractor, and salvage by other.

5. Recycling: Arrange for timely pickups from the site or deliveries to recycling facility in order to prevent contamination of recyclable materials.

1.5 WASTE MANAGEMENT PLAN
A. General: Develop a waste management plan according to the requirements in this Section, as well as the requirements indicated in the LEED for Building Design and Construction New Construction Reference Guide, version 2009, under Materials and Resources Credit 2 – Construction Waste Management. Plan shall consist of the following sections: Waste Management Goals, Responsible Parties, Waste Identification, Waste Prevention and Diversion Measures, Contamination Prevention Measures, Communication and Education Measures, Onsite Recycling Operations, and Cost/Revenue Analysis. Distinguish between demolition and construction waste. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan. The plan shall result in end-of-Project rates for salvage/recycling of minimum 65 percent by weight or volume of the total waste generated by the work. Refer the Contra Costa Cal Green Construction and Demolition Debris Recovery Program and follow the CalGreen applicant Instructions. (https://www.contracosta.ca.gov/DocumentCenter/View/61489/CalGreen-ApplicantInstructions---Non-Residential-Projects?bidId=).

Page 577 of 1236 ends

CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 4 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
B. Waste Identification: Indicate anticipated types and quantities of demolition, site- clearing and construction waste generated by the Work. Include estimated quantities and assumptions for estimates
C. The list of these materials is to include, at minimum, the following materials:

1. Cardboard.

2. Clean dimensional wood.

3. Beverage containers.

4. Land clearing debris.

5. Concrete.

6. Bricks.

7. Concrete Masonry Units (CMU).

8. Metals from banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized sheet steel, stainless steel, aluminum, copper, zinc, lead, brass, and bronze.

9. Drywall.

10. Carpet and carpet pads.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION

3.1 WASTE MANAGEMENT PLAN IMPLEMENTATION
A. Manager: The Contractor shall designate an on-site party (or parties) responsible for instructing workers and overseeing and documenting results of the Waste Management Plan for the Project.

B. Distribution: The Contractor shall distribute copies of the Waste Management Plan to the Job Site Foreman, each Subcontractor, the Owner, and the Owner’s Representative.

C. Instruction and Training: The Contractor shall provide on-site instruction and train workers, subcontractors and suppliers of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used.

D. Separation facilities: The Contractor shall layout and label a specific area to facilitate separation of materials for potential recycling, salvage, reuse, and return. Recycling and waste bin areas are to be kept neat and clean and clearly marked in order to avoid contamination of materials.

Waste may be commingled at the site in a specific label area for pickup by the waste hauler and separated at a recycling facility.

E. Hazardous wastes: Hazardous wastes shall be separated, stored, and disposed of according to local regulations.

F. Contractor shall provide a monthly summary to the LEED Consultant with the following information:

Page 578 of 1236 ends

CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 5 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
G. The amount (in tons or cubic yards) of material landfilled from the Project, the identity of the landfill, the total amount of tipping fees paid at the landfill, and the total disposal cost.

Include manifests, weight tickets, receipt, and invoices.

H. For each material recycled, reused, or salvaged from the Project, the amount (in tons or cubic yards), the date (removed from the jobsite, the receiving party, the transportation cost, the amount of any money paid or received for the recycled or salvaged material, and the net total cost or savings of salvage or recycling each material). Attach manifests, weight tickets, receipts, and invoices.

3.2 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL A. General: Recycle paper and beverage containers used by on-site workers.

B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Owner.

Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.

C. Procedures: Separate recyclable waste from other waste materials, trash, and debris.

Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan
D. Provide appropriately marked containers or bins for controlling recyclable waste until removed from Project site. Include list of acceptable and unacceptable materials at each container and bin. Regularly inspect bins for contamination.

E. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

F. Stockpile materials away from construction area. Do not store within drip line of remaining trees.

G. Store components off the ground and protect from the weather.

H. Remove recyclable waste from Owner's property per approved Waste Management Plan.

3.3 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

1. Except as otherwise specified, do not allow waste materials that are to be disposed of to accumulate on-site.

Page 579 of 1236 ends

CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 6 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3.4 INSTALLATION
A. Install product(s) per manufacturer's recommendations to reduce damage to or waste of materials by required replacement.

3.5 TRANSPORTATION
A. Transport materials in covered trucks to prevent contamination of product or littering of surrounding areas.

3.6 GENERAL CLEANING
A. Control accumulation of waste materials and trash. Recycle or dispose of off-site at intervals approved by the Owner and in compliance with waste management procedures.

B. Cleaning materials: Use cleaning materials that are non-hazardous.

3.7 FINAL CLEANING
A. Cleaning Materials: Only non-hazardous cleaning materials shall be used in the final cleanup.

B. Recycle, salvage, and return construction and demolition waste from Project.

C. Arrange for pick-up of salvageable materials in accordance with the Waste Management Plan.

D. Disposal Operations: Promptly and legally transport and dispose of any trash. Do not burn, bury, or otherwise dispose of trash on the Project site.

END OF SECTION

Page 580 of 1236 ends

CLEANING 01 74 20 - 1 of 4
SECTION 01 74 20 CLEANING
PART 1 – GENERAL

1.1 Section Includes
A. Cleaning throughout the construction period, and final project cleaning prior to the acceptance tour.

1.2 Quality Assurance
A. Inspection: Conduct daily inspection, and more often if necessary, to verify that requirements of cleanliness are being met.

B. Codes and Standards: In addition to the requirements specified herein, comply with pertinent requirements of authorities having jurisdiction.

PART 2 – PRODUCTS

2.1 Cleaning Materials and Equipment
A. Provide required personnel, equipment, and materials needed to maintain the specified standard of cleanliness.

2.2 Compatibility
A. Use cleaning materials and equipment that are compatible with the surfaces being cleaned, as recommended by the manufacturer of the material to be cleaned.

PART 3 – EXECUTION

3.1 Progress Cleaning
A. General:

1. Retain stored items in an orderly arrangement allowing maximum access, not impeding drainage or traffic, and providing the required protection of materials.

2. Do not allow the accumulation of scrap, debris, waste material, and other items not required for construction of this work. Debris shall be removed from the site and disposed of in a lawful manner. Disposal receipts or dump tickets shall be furnished to Architect upon request.

3. At least twice each month, and more often if necessary, remove scrap debris, and waste material from the job site.

Page 581 of 1236 ends

CLEANING 01 74 20 - 2 of 4
SECTION 01 74 20 CLEANING

4. Provide adequate storage for items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.

B. Site:

1. Daily, and more often if necessary, inspect the site and pick up all scrap, debris, and waste material. Remove items to the place designated for their storage. Flammable waste shall be kept in sealed metal containers until removed from the site.

2. Weekly, and more often if necessary, inspect, arrangements of materials stored on the site; restack, tidy, or otherwise service arrangements to meet the requirements specified above.

3. Maintain the site in a neat and orderly condition.

C. Structures:

1. Weekly, and more often if necessary, inspect the structures and pick up scrap, debris, and waste material. Remove items to the place designated for their storage.

2. Weekly, and more often if necessary, sweep interior spaces clean. a. “Clean”, for the purpose of this subparagraph, shall be interpreted as meaning free from dust and other material capable of being removed by use of reasonable effort and a handheld broom, i.e., “broom-clean”.

3. As required preparatory to installation of succeeding materials, clean the structures of pertinent portions thereof to the degree of cleanliness recommended by the manufacturer of the succeeding material, using equipment and materials required to achieve the required cleanliness.

4. Following the installation of finish floor materials, clean the finish floor daily, and more often if necessary, and while work is being performed in the space in which finish materials have been installed.
a. “Clean”, for the purpose of this subparagraph, shall be interpreted as meaning free from foreign material that, in the opinion of the Architect, may be injurious to the finish floor material, i.e., “vacuum-clean”.

D. General: The General Conditions require general cleaning during construction. Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris, and waste, conduct final progress cleaning as described below.

E. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. Comply with manufacturer's instructions. Unless otherwise specifically directed by the Architect, water and broom clean paved areas on the site and public paved areas directly adjacent to the site. Remove resultant debris F. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion.

1. Remove labels that are not permanent labels.

Page 582 of 1236 ends

CLEANING 01 74 20 - 3 of 4
SECTION 01 74 20 CLEANING

2. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other substances that are noticeable visionobscuring materials. Replace chipped or broken glass and other damaged transparent materials.

G. Clean exposed exterior and interior hard-surfaced finishes to a dust-free condition, free of stains, films, and similar foreign substances. Restore reflective surfaces to their original condition. Leave concrete floors broom clean. Vacuum carpeted surfaces. Sweep and mop vinyl and rubber surfaces.

H. Structures:

3. Exterior: In areas affected by the work under this contract, visually inspect exterior surfaces and remove traces of soil, waste material, smudges, and other foreign matter. Remove traces of splashed material from adjacent surfaces. If necessary to achieve a uniform degree of exterior cleanliness, hose down the exterior of the structure.

4. In the event of stubborn stains not removable with water, the Architect may require light sandblasting or other cleaning at no additional cost to the District.

I. Interior: In areas affected by the work under this contract, visually inspect interior surfaces and remove traces of soil waste material, smudges, and other foreign matter. Remove traces of splashed materials from adjacent surfaces. Remove paint drippings, spots, stains, and dirt from finished surfaces. Use only the cleaning materials and equipment instructed by the manufacturer of the surface material.

J. Glass: Clean glass inside and outside.

K. Polished surfaces: On surfaces requiring the routine application of buffed polish, apply the polish recommended by the manufacturer of the material being polished. Glossy surfaces shall be cleaned and shined as intended by the manufacturer

5. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and other substances. Clean plumbing fixtures to a sanitary condition. Clean light fixtures and lamps.

6. Clean the site, including landscape development areas, of rubbish, litter, and other foreign substances. Sweep paved areas broom clean; remove stains, spills, and other foreign deposits. Rake grounds that are neither paved nor planted to a smooth, eventextured surface.

L. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid the Project of rodents, insects, and other pests.

M. Removal of Protection: Remove temporary protection and facilities installed for protection of the Work during construction.

N. Compliance: Comply with regulations of authorities having jurisdiction and safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess

Page 583 of 1236 ends

CLEANING 01 74 20 - 4 of 4
SECTION 01 74 20 CLEANING
materials on the District's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site and dispose of lawfully.

O. Extra Materials: Where extra materials of value remain after completion of associated Work, they become the District's property. Dispose of these materials as directed by the Owner.

P. Timing: Schedule final cleaning as accepted by the Architect to enable the District to accept a completely clean project.

Q. Cleaning During District's Occupancy

7. Should the District occupy the work or any portion thereof prior to its completion by the Contractor and acceptance by the District, responsibilities for interim and final cleaning of the occupied spaces shall be determined by the Architect in accordance with the General Conditions of the Contract.

END OF SECTION

Page 584 of 1236 ends

CLOSEOUT PROCEDURES 01 77 00 – 1 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
PART 1 - GENERAL

1.1 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Final Completion.

3. Warranties.

4. Final cleaning.

5. Repair of work.

B. 01 79 00 "Demonstration and Training" for requirements for instructing Owner's personnel.

C. See Divisions 02 through 48 Sections for specific closeout and special cleaning requirements for the Work in those Sections.

1.2 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Owner of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.

7. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.

8. Complete startup testing of systems.

9. Submit test/adjust/balance records.

10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

11. Advise Owner of changeover in heat and other utilities.

12. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.

13. Complete final cleaning requirements, including touchup painting.

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

15. Successful completion of Functional Testing for equipment requiring LDD Commissioning.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final

Page 585 of 1236 ends

CLOSEOUT PROCEDURES 01 77 00 – 2 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
Completion.

1.3 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit a final Application for Payment according to "Payment Procedures."

2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements.

Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit electronic versions of list (including editable file and PDF file). Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order, starting with exterior areas first.

2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.

3. Submit list of incomplete items in the following format:
a. MS Excel electronic file. Architect, though Construction Manager, will retune annotate copy.

1.5 WARRANTIES
A. Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8- 1/2-by-11- inch paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.

Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

C. Provide additional copies of each warranty to include in operation and maintenance manuals.

Page 586 of 1236 ends

CLOSEOUT PROCEDURES 01 77 00 – 3 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
PART 2 - PRODUCTS

2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 - EXECUTION

3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Remove snow and ice to provide safe access to building. f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
g. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
h. Sweep concrete floors broom clean in unoccupied spaces. i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if visible soil or stains remain.
j. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other noticeable, vision- obscuring materials.

Replace chipped or broken glass and other damaged transparent materials.

Polish mirrors and glass, taking care not to scratch surfaces. k. Remove labels that are not permanent.
l. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. 1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.
m. Wipe surfaces of mechanical and electrical equipment and similar equipment.

Remove excess lubrication, paint and mortar droppings, and other foreign substances.

Page 587 of 1236 ends

CLOSEOUT PROCEDURES 01 77 00 – 4 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
n. Replace parts subject to unusual operating conditions. o. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.
p. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.
q. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.
r. Leave Project clean and ready for occupancy.

C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION

Page 588 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 1 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
PART 1 – GENERAL

1.1 SUMMARY
A. Commissioning is intended to achieve the following specific objectives; this section specifies the Contractor's responsibilities for commissioning:

1. Verify that the work is installed in accordance with Contract Documents and the manufacturer’s recommendations and instructions, and that it receives adequate operational checkout prior to startup: Startup reports and Prefunctional Checklists executed by Contractor are utilized to achieve this.

2. Verify and document that functional performance is in accordance with Contract Documents: Functional Tests executed by Contractor and witnessed by the Commissioning Authority are utilized to achieve this.

3. Verify that operation and maintenance manuals submitted to Airport are complete:

Detailed operation and maintenance (O&M) data submittals by Contractor are utilized to achieve this.

4. Verify that the Airport’s operating personnel are adequately trained: Formal training conducted by Contractor is utilized to achieve this.

B. The Commissioning Authority directs and coordinates all commissioning activities; this section describes some but not all of the Commissioning Authority's responsibilities.

1.2 RELATED REQUIREMENTS
A. Section 01 77 00 - Closeout Submittals: Scope and procedures for operation and maintenance manuals and project record documents.

PART 2 – PRODUCTS

2.1 TEST EQUIPMENT
A. Provide all standard testing equipment required to perform startup and initial checkout and required Functional Testing; unless otherwise noted such testing equipment will NOT become the property of Airport.

B. Calibration Tolerances: Provide testing equipment of sufficient quality and accuracy to test and/or measure system performance with the tolerances specified. If not otherwise noted, the following minimum requirements apply:

1. Temperature Sensors and Digital Thermometers: Certified calibration within past year to accuracy of 0.5 degree F and resolution of plus/minus 0.1 degree F.

2. Pressure Sensors: Accuracy of plus/minus 2.0 percent of the value range being measured (not full range of meter), calibrated within the last year.

Page 589 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 2 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS

3. Calibration: According to the manufacturer’s recommended intervals and when dropped or damaged; affix calibration tags or keep certificates readily available for inspection.

C. Equipment-Specific Tools: Where special testing equipment, tools and instruments are specific to a piece of equipment, are only available from the vendor, and are required in order to accomplish startup or Functional Testing, provide such equipment, tools, and instruments as part of the work at no extra cost to Airport; such equipment, tools, and instruments are to become the property of Airport.

D. Dataloggers: Independent equipment and software for monitoring flows, currents, status, pressures, etc. of equipment.

1. Dataloggers required to for Functional Tests will be provided by the Commissioning Authority and will not become the property of Airport.

PART 3 – EXECUTION

3.1 COMMISSIONING PLAN
A. Commissioning Authority has prepared the Commissioning Plan.

1. Attend meetings called by the Commissioning Authority for purposes of completing the commissioning plan.

2. Require attendance and participation of relevant subcontractors, installers, suppliers, and manufacturer representatives.

B. Contractor is responsible for compliance with the Commissioning Plan.

C. Commissioning Plan: The commissioning schedule, procedures, and coordination requirements for all parties in the commissioning process.

D. Commissioning Schedule:

1. Submit anticipated dates of startup of each item of equipment and system to Commissioning Authority within 60 days after award of Contract.

2. Re-submit anticipated startup dates monthly, but not less than 4 weeks prior to startup.

3. Prefunctional Checklists and Functional Tests are to be performed in sequence from components, to subsystems, to systems.

4. Provide sufficient notice to Commissioning Authority for delivery of relevant Checklists and Functional Test procedures, to avoid delay.

3.2 STARTUP PLANS AND REPORTS
A. Startup Plans: For each item of equipment and system for which the manufacturer provides a startup plan, submit the plan not less than 8 weeks prior to startup.

Page 590 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 3 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
B. Startup Reports: For each item of equipment and system for which the manufacturer provides a startup checklist (or startup plan or field checkout sheet), document compliance by submitting the completed startup checklist prior to startup, signed and dated by responsible entity.

C. Submit directly to the Commissioning Authority.

3.3 PREFUNCTIONAL CHECKLISTS
A. A Prefunctional Checklist is required to be filled out for each item of equipment or other assembly specified to be commissioned.

1. No sampling of identical or near-identical items is allowed.

2. These checklists do not replace manufacturers' recommended startup checklists, regardless of apparent redundancy.

3. Prefunctional Checklist forms will not be complete until after award of the contract; the following types of information will be gathered via the completed Checklist forms:
a. Certification by installing contractor that the unit is properly installed, started up, and operating and ready for Functional Testing.
b. Confirmation of receipt of each shop drawing and commissioning submittal specified, itemized by unit.
c. Manufacturer, model number, and relevant capacity information; list information "as specified," "as submitted," and "as installed." d. Serial number of installed unit.
e. List of inspections to be conducted to document proper installation prior to startup and Functional Testing; these will be primarily static inspections and procedures; for equipment and systems may include normal manufacturer’s start-up checklist items and minor testing.
f. Sensor and actuator calibration information.

B. Contractor is responsible for filling out Prefunctional Checklists, after completion of installation and before startup; witnessing by the Commissioning Authority is not required unless otherwise specified.

1. Each line item without deficiency is to be witnessed, initialed, and dated by the actual witness; checklists are not complete until all line items are initialed and dated complete without deficiencies.

2. Checklists with incomplete items may be submitted for approval provided the Contractor attests that incomplete items do not preclude the performance of safe and reliable Functional Testing; re-submission of the Checklist is required upon completion of remaining items.

3. Individual Checklists may contain line items that are the responsibility of more than one installer; Contractor shall assign responsibility to appropriate installers or subcontractors, with identification recorded on the form.

4. If any Checklist line item is not relevant, record reasons on the form.

5. Contractor may independently perform startup inspections and/or tests, at Contractor's option.

Page 591 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 4 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS

6. Regardless of these reporting requirements, Contractor is responsible for correct startup and operation.

7. Submit completed Checklists to Commissioning Authority within two days of completion.

C. Commissioning Authority is responsible for furnishing the Prefunctional Checklists to Contractor.

1. Initial Drafts: Contractor is responsible for initial draft of Prefunctional Checklist where so indicated in Contract Documents.

2. Provide all additional information requested by Commissioning Authority to aid in preparation of checklists, such as shop drawing submittals, manufacturers' startup checklists, and O&M data.

3. Commissioning Authority may add any relevant items deemed necessary regardless of whether they are explicitly mentioned in Contract Documents or not.

4. When asked to review the proposed Checklists, do so in a timely manner.

D. Commissioning Authority Witnessing: Required for:

1. Each piece of primary equipment, unless sampling of multiple similar units is allowed by the commissioning plan.

2. A sampling of non-primary equipment, as allowed by the commissioning plan.

E. Deficiencies: Correct deficiencies and re-inspect or re-test, as applicable, at no extra cost to Airport.

1. If difficulty in correction would delay progress, report deficiency to the Commissioning Authority immediately.

3.4 FUNCTIONAL TESTS
A. A Functional Test is required for each item of equipment, system, or other assembly specified to be commissioned, unless sampling of multiple identical or near-identical units is allowed by the final test procedures.

B. Contractor is responsible for execution of required Functional Tests, after completion of Prefunctional Checklist and before closeout.

C. Commissioning Authority is responsible for witnessing and reporting results of Functional Tests, including preparation and completion of forms for that purpose.

D. Contractor is responsible for correction of deficiencies and re-testing at no extra cost to Airport; if a deficiency is not corrected and re-tested immediately, the Commissioning Authority will document the deficiency and the Contractor's stated intentions regarding correction.

1. Deficiencies are any condition in the installation or function of a component, piece of equipment or system that is not in compliance with Contract Documents or does not perform properly.

2. When the deficiency has been corrected, the Contractor completes the form certifying that the item is ready to be re-tested and returns the form to the

Page 592 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 5 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
Commissioning Authority; the Commissioning Authority will reschedule the test and the Contractor shall re-test.

3. Identical or Near-Identical Items: If 10 percent, or three, whichever is greater, of identical or near-identical items fail to perform due to material or manufacturing defect, all items will be considered defective; provide a proposal for correction within 2 weeks after notification of defect, including provision for testing sample installations prior to replacement of all items.

4. Contractor shall bear the cost of Airport and Commissioning Authority personnel time witnessing re-testing.

5. Contractor shall bear the cost of Airport and Commissioning Authority personnel time witnessing re-testing if the test failed due to failure to execute the relevant Prefunctional Checklist correctly; if the test failed for reasons that would not have been identified in the Prefunctional Checklist process, Contractor shall bear the cost of the second and subsequent re-tests.

E. Functional Test Procedures:

1. Some test procedures are included in Contract Documents; where Functional Test procedures are not included in Contract Documents, test procedures will be determined by the Commissioning Authority with input by and coordination with Contractor.

2. Examples of Functional Testing:
a. Test the dynamic function and operation of equipment and systems (rather than just components) using manual (direct observation) or monitoring methods under full operation (e.g., the chiller pump is tested interactively with the chiller functions to see if the pump ramps up and down to maintain the differential pressure setpoint). b. Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc.
c. Systems are run through all the HVAC control system’s sequences of operation and components are verified to be responding as the sequence's state. d. Traditional air or water test and balancing (TAB) is not Functional Testing; spot checking of TAB by demonstration to the Commissioning Authority is Functional Testing.

F. Deferred Functional Tests: Some tests may need to be performed later, after substantial completion, due to partial occupancy, equipment, seasonal requirements, design or other site conditions; performance of these tests remains the Contractor's responsibility regardless of timing.

3.5 SENSOR AND ACTUATOR CALIBRATION
A. Calibrate all field-installed temperature, relative humidity, carbon monoxide, carbon dioxide, and pressure sensors and gauges, and all actuators (dampers and valves) on this

Page 593 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 6 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
piece of equipment shall be calibrated. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated.

B. Calibrate using the methods described below; alternate methods may be used, if approved by Commissioning Authority and Owner beforehand. See PART 2 for test instrument requirements. Record methods used on the relevant Prefunctional Checklist or other suitable forms, documenting initial, intermediate and final results.

C. All Sensors:

1. Verify that sensor location is appropriate and away from potential causes of erratic operation.

2. Verify that sensors with shielded cable are grounded only at one end.

3. For sensor pairs that are used to determine a temperature or pressure difference, for temperature make sure they are reading within 0.2 degree F of each other, and for pressure, within tolerance equal to 2 percent of the reading, of each other.

4. Tolerances for critical applications may be tighter.

D. Sensors Without Transmitters - Standard Application:

1. Make a reading with a calibrated test instrument within 6 inches of the site sensor.

2. Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrumentmeasured value.

3. If not, install offset, calibrate or replace sensor.

E. Sensors With Transmitters - Standard Application.

1. Disconnect sensor.

2. Connect a signal generator in place of sensor.

3. Connect ammeter in series between transmitter and building automation system control panel.

4. Using manufacturer’s resistance-temperature data, simulate minimum desired temperature.

5. Adjust transmitter potentiometer zero until 4 mA is read by the ammeter.

6. Repeat for the maximum temperature matching 20 mA to the potentiometer span or maximum and verify at the building automation system.

7. Record all values and recalibrate controller as necessary to comply with specified control ramps, reset schedules, proportional relationship, reset relationship and P/I reaction.

8. Reconnect sensor.

9. Make a reading with a calibrated test instrument within 6 inches of the site sensor.

10. Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrumentmeasured value.

11. If not, replace sensor and repeat.

12. For pressure sensors, perform a similar process with a suitable signal generator.

F. Sensor Tolerances for Standard Applications: Plus/minus the following maximums:

Page 594 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 7 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS

1. Watthour, Voltage, Amperage: 1 percent of design.

2. Pressure, Air, Water, Gas: 3 percent of design.

3. Air Temperatures (Outside Air, Space Air, Duct Air): 0.4 degrees F.

4. Relative Humidity: 4 percent of design.

5. Barometric Pressure: 0.1 inch of Hg.

6. Flow Rate, Air: 10 percent of design.

7. Flow Rate, Water: 4 percent of design.

8. AHU Wet Bulb and Dew Point: 2.0 degrees F.

G. Critical Applications: For some applications more rigorous calibration techniques may be required for selected sensors. Describe any such methods used on an attached sheet.

H. Valve/Damper Stroke Setup and Check:

1. For all valve/damper actuator positions checked, verify the actual position against the control system readout.

2. Set pump/fan to normal operating mode.

3. Command valve/damper closed; visually verify that valve/damper is closed and adjust output zero signal as required.

4. Command valve/damper to open; verify position is full open and adjust output signal as required.

5. Command valve/damper to a few intermediate positions.

6. If actual valve/damper position does not reasonably correspond, replace actuator or add pilot positioner (for pneumatics).

I. Isolation Valve or System Valve Leak Check: For valves not associated with coils.

1. With full pressure in the system, command valve closed.

2. Use an ultra-sonic flow meter to detect flow or leakage.

3.6 TEST PROCEDURES – GENERAL
A. Provide skilled technicians to execute starting of equipment and to execute the Functional Tests. Ensure that they are available and present during the agreed upon schedules and for sufficient duration to complete the necessary tests, adjustments and problem-solving.

B. Provide all necessary materials and system modifications required to produce the flows, pressures, temperatures, and conditions necessary to execute the test according to the specified conditions. At completion of the test, return all affected equipment and systems to their pre-test condition.

C. Sampling: Where Functional Testing of fewer than the total number of multiple identical or near-identical items is explicitly permitted, perform sampling as follows:

1. Identical Units: Defined as units with same application and sequence of operation; only minor size or capacity difference.

2. Sampling is not allowed for:
a. Major equipment.

Page 595 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 8 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
b. Life-safety-critical equipment.
c. Prefunctional Checklist execution.

3. XX = the percent of the group of identical equipment to be included in each sample; defined for specific type of equipment.

4. YY = the percent of the sample that if failed will require another sample to be tested; defined for specific type of equipment.

5. Randomly test at least XX percent of each group of identical equipment, but not less than three units. This constitutes the "first sample."

6. If YY percent of the units in the first sample fail, test another XX percent of the remaining identical units.

7. If YY percent of the units in the second sample fail, test all remaining identical units.

8. If frequent failures occur, resulting in more troubleshooting than testing, the Commissioning Authority may stop the testing and require Contractor to perform and document a checkout of the remaining units prior to continuing testing.

D. Manual Testing: Use hand-held instruments, immediate control system readouts, or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).

E. Simulating Conditions: Artificially create the necessary condition for the purpose of testing the response of a system; for example apply hot air to a space sensor using a hair dryer to see the response in a VAV box.

F. Simulating Signals: Disconnect the sensor and use a signal generator to send an amperage, resistance or pressure to the transducer and control system to simulate the sensor value.

G. Over-Writing Values: Change the sensor value known to the control system in the control system to see the response of the system; for example, change the outside air temperature value from 50 degrees F to 75 degrees F to verify economizer operation.

H. Indirect Indicators: Remote indicators of a response or condition, such as a reading from a control system screen reporting a damper to be 100 percent closed, are considered indirect indicators.

I. Monitoring: Record parameters (flow, current, status, pressure, etc.) of equipment operation using dataloggers or the trending capabilities of the relevant control systems; where monitoring of specific points is called for in Functional Test Procedures:

1. All points that are monitored by the relevant control system shall be trended by Contractor; at the Commissioning Authority’s request, Contractor shall trend up to 20 percent more points than specified at no extra charge.

2. Other points will be monitored by the Commissioning Authority using dataloggers.

3. At the option of the Commissioning Authority, some control system monitoring may be replaced with datalogger monitoring.

Page 596 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 9 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS

4. Provide hard copies of monitored data in columnar format with time down left column and at least 5 columns of point values on same page.

5. Graphical output is desirable and is required for all output if the system can produce it.

6. Monitoring may be used to augment manual testing.

3.7 OPERATION AND MAINTENANCE MANUALS
A. Add design intent documentation furnished by Architect to manuals prior to submission.

B. Submit manuals related to items that were commissioned to Commissioning Authority for review; make changes recommended by Commissioning Authority.

C. Commissioning Authority will add commissioning records to manuals after submission. - END OF SECTION

Page 597 of 1236 ends

GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 10 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS

PAGE INTENTIONALLY LEFT BLANK

Page 598 of 1236 ends

SECTION 02 41 00 DEMOLITION
DEMOLITION 02 41 00 - 1 of 3
PART 1 GENERAL
A.01 DESCRIPTION
A. This section specifies demolition and removal of buildings, portions of buildings, utilities, pavements, base courses, signage, pavement markings, other structures and debris from trash dumps shown.

B. Includes removal of interior wood and suspended ceiling systems, lighting, raceways, conductors, and attachments to ceiling areas removed.

C. Includes removal of interior floors, foundation coring, exterior pavements, trenching, barricades, patching, coordination, permitting and other work related to installation on new sanitary sewer underground piping and new lateral.

D. Demolition materials shall be removed from site and costs for transportation and removal included in Bid. Including all pavements and base course materials.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 PROTECTION
A. Perform demolition in such a manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.

B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel and aircraft during demolition and removal operations.

C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.

D. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily. Follow City requirements.

E. In addition to previously listed fire and safety rules to be observed in performance of work, include following:

1. No wall or part of wall shall be permitted to fall outwardly from structures.

Page 599 of 1236 ends

SECTION 02 41 00 DEMOLITION
DEMOLITION 02 41 00 - 2 of 3

2. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.

3. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 15 feet of fire hydrants.

F. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the site; any damaged items shall be repaired or replaced. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works.

1.04 UTILITY SERVICES
A. Demolish and remove outside utility service lines (water, sewer, storm water, gas, electrical and communications) shown to be removed and as required to install new utility lines and building.

B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.

C. Coordinate removal of utilities with utility companies.

D. Coordinate relocation of mainline sewer and water lines.

PART 2 PRODUCTS

NOT USED
PART 3 EXECUTION

3.01 DEMOLITION
A. Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto. Completely demolish pavements, curbs, walks, pads, irrigation systems, utility boxes, gutters, exterior signage, landscaping, landscape features, fencing and all other site features required to install new building and site elements.

1. As required for installation of new utility service lines.

2. To full depth within an area defined by hypothetical lines located 20 feet outside building lines of new structures.

Page 600 of 1236 ends

SECTION 02 41 00 DEMOLITION
DEMOLITION 02 41 00 - 3 of 3

3. As required to install new site/civil components.

B. Debris, including brick, concrete, stone, metals and similar materials shall become the property of Contractor and shall be disposed daily, off the property to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Owner. Contractor shall dispose of debris in compliance with applicable federal, state or local permits, rules and/or regulations.

C. Remove and legally dispose of all materials, other than earth to remain as part of project work. Materials removed shall become the property of the contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations. Materials that are located beneath the surface of the surrounding ground.

D. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Owner. When utility lines are encountered that are not indicated on the drawings, the Owner shall be notified prior to further work in that area.

3.02 CLEAN-UP
A. On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Owner. Clean-up shall include off-site disposal of all items and materials not required to remain property of the Owner as well as all debris and rubbish resulting from demolition operations.

END OF SECTION

Page 601 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 602 of 1236
SECTION 03 05 00 CONCRETE TESTS AND INSPECTIONS
CONCRETE TESTS AND INSPECTIONS 03 05 00 - 1 of 3
PART 1 GENERAL

1.01 SUMMARY
A. This Section includes the requirements for tests and inspections for site concrete work specified in Sections 03 20 00 Concrete Reinforcement and 03 30 00 Cast in Place Concrete.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit for review and approval.

1. Design Data: Certified copies of mix designers for each concrete class specified

2. Certifications that materials comply with requirements specified.

3. Samples: As requested by the Testing Laboratory and accompanied by certification from vendor that samples originate from and are representative of each lot proposed for use.

4. Test Reports
a. Mill test reports for reinforcement.
b. Reports from testing organization.

1.04 QUALITY ASSURANCE
A. Referenced Standards

1. California Building Code (CBC), 2019.

2. ACI 301 – Specifications for Structural Concrete for Buildings.

3. ACI 318 – Building Code Requirements for Structural Concrete.

4. ASTM C143 / C143M-15a – Standard Test Method for Slump of HydraulicCement Concrete

1.05 DELIVERY, STORAGE AND HANDLING

Page 603 of 1236 ends

SECTION 03 05 00 CONCRETE TESTS AND INSPECTIONS
CONCRETE TESTS AND INSPECTIONS 03 05 00 - 2 of 3
A. Owner is responsible for all testing and inspection of concrete work. The owner shall retain the services of a certified testing laboratory to perform concrete testing.

PART 2 PRODUCTS

2.01 REINFORCEMNT
A. The Testing Laboratory

1. Take samples from bundles delivered to job site from the mill, unless bundles are identified by heat number and accompanied by mill certificates. When reinforced is not positively identified by heat numbers or when random sampling is intended two specimens will be taken from each 2 ½ tons or fraction thereof of each size and grade.

2. Test for tensile and bending strength in accordance with CBC Chapters 17 and

19. 2.02 CAST IN PLACE CONCRETE
A. The Testing Laboratory will:

1. Review mix designs, compliance certificates and samples of materials proposed for use.

2. Test and inspect materials according to CBC 1903 from compliance with requirements specified in Section 03 30 00 Cast-in-Place Concrete.

3. Inspect batch plant prior to concrete being furnished to verify that:
a. Plant is equipped with approved metering devices for determining moisture content of fine aggregate.
b. Other plant quality controls are satisfactory.

PART 3 EXECUTION

3.01 CAST-IN-PLACE CONCRETE
A. The Testing Laboratory will:

1. Perform testing in accordance with ACI 318

2. Test concrete slump in accordance with ASTM C143

3. Test concrete for required compressive strength in conformance with CBC Section 1905, as follows.
a. Make and cure a minimum of five specimen cylinders according to ASTM C31 for each 150 cubic yards, or fraction thereof, of each class of concrete placed each day.

Page 604 of 1236 ends

SECTION 03 05 00 CONCRETE TESTS AND INSPECTIONS
CONCRETE TESTS AND INSPECTIONS 03 05 00 - 3 of 3
b. As a minimum, one set of five specimen cylinders shall be made for each 5,000 square feet of slab or wall surface area or fraction thereof placed each day
c. Retain one cylinder for 7-day test, one for 14-day test, and two for 28- day test. Hold one or more cylinders for subsequent testing, in necessary.
d. Number each cylinder, date each set of cylinders and record placement represented by each set of cylinders.
e. Transport specimen cylinders from jobsite to laboratory. f. Test specimen cylinders according to ASTM C30 from specified strength after cylinders have aged for 7 days, 14 days, and 28 days.

B. Furnish to the Testing Laboratory the ready-mix delivery tickets for each batch of concrete delivered to the jobsite, each ticket bearing the following:

1. Design mix number

2. Time of batching

3. Weight of cement, type and maximum size of aggregates, water, and admixtures in each batch.

4. Total volume of concrete in each batch.

C. When laboratory tests of specimen cylinders show compressive strengths below the minimum specified, the Contractor will be back charged for costs of the taking and testing core specimens of hardened concrete according to ASTM C42.

END OF SECTION

Page 605 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 606 of 1236
SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 1 of 4
PART 1 GENERAL

1.01 SUMMARY
A. This section includes the requirements for furnishing and placing concrete formwork.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 QUALITY ASSURANCE
A. Referenced Standards

1. California Building Code (CBC), 2019

2. ACI 301 – Specifications for Structural Concrete for Buildings.

3. ACI 318 – Building Code Requirements for Reinforced Concrete

4. ACI 347R – Guide to Formwork for Concrete.

5. CRSI Manual of Standard Practice

6. PSI-95 US Product Standard for Construction and Industrial Plywood

7. West Coast Lumber Inspection Bureau (WCLB) Standard.

8. Western Wood Products Association (WWPA) Publication: Western Lumber Grading Rules.

B. Design Criteria: Unless otherwise shown, noted, or specified, formwork shall be in conformance with ACI 347

1.04 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle materials subject to damage from dirt and moisture maintaining them clean and dry, off the ground, and suitably protected.

Page 607 of 1236 ends

SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 2 of 4
PART 2 PRODUCTS

2.01 MATERIALS
A. General: Form materials shall be new at start of work.

B. Form Lumber: Douglas Fir, Construction Grade, S1S2E
C. Plywood Forms and Architectural Smooth Finish: Five-ply, 3/4-inch thick, APA A-A Plyform, Class I, Exterior Type, with mill-oiling treatment omitted for architecture smooth finish; or Owner approved equal.

D. Flexible spring steel forms or laminated boards for forming radius bends.

E. Form Accessories:

1. Accessories which will be entirely or partially embedded in concrete, such as ties and hangers, shall be of metal and of standard manufacture; wire ties are not acceptable.

2. The portion of embedded accessories remaining in concrete shall have no metal within one inch of face of concrete, and shall have no fractures, spalls, depressions, or other surface disfigurations exceeding 3/4 inch in diameter.

3. Spreader cones on ties shall not exceed one inch in diameter.

F. Form Sealer: Sealer shall eliminate grain raise as a result of moisture, and shall not interfere with color, bond, or subsequent treatment of or application of finishes to concrete surface; Sonneborn Building Products, Inc. "Form Saver," Grace Construction Materials "Form Film," Burke "Form Sealer," or approved equal.

G. Form Release Agents:

1. For Concrete Exposed to View in the Finished Work or to Receive Applied Finishes: Use chemically-active types producing water-insoluble soaps. Release agents shall contain no petroleum-based solvents such as creosote, paraffin, wax, or diesel oil.

2. For ABS form liners, use only form release agents recommended by form liner manufacturer.

3. For Unexposed Concrete: Any type that will not interfere with bond of finishes to be applied.

PART 3 EXECUTION

3.01 PREPARATION
A. Treat contact surface of plywood and board forms with a form sealer in accordance with the manufacturer's printed instructions.

B. Clean form surfaces and reseal before each use. The use of form oil will not be permitted.

Page 608 of 1236 ends

SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 3 of 4

3.02 CONSTRUCTION
A. Design, construct, and brace formwork and temporary falsework to safely support concrete and hold personnel during construction operations.

B. Coordinate design, construction, and installation of formwork to accommodate openings, sleeves, chases, pipes, nailers, anchors, ties, inserts, and other embedded items.

C. Construct forms of sufficient strength and rigidity to produce finished concrete of the size, shape, and location shown, without exceeding specified tolerances. Form assembly shall permit removal in proper sequence without damaging concrete.

D. Use only new plywood form material for creating smooth architectural finish where required; reuse of forms not permitted for creating smooth architectural finish.

E. Install form liners for architectural finishes in strict accordance with manufacturer’s printed instructions and approved submittal.

F. Arrange forms to permit single pours of exposed areas and panels without joints between adjacent form materials in the same plane.

G. Construct forms for all exposed to view concrete full height and width between construction joints in surface of concrete. Do not break forms for pour or construction joints within such areas.

H. Forms shall not extend higher than 12 inches above the top of a pour or construction joint.

I. Form construction joints as specified in Section 03 30 00 – Cast-In-Place Concrete.

Provide a surfaced pouring strip where construction joints intersect faces of surfaces to be exposed to view in the finished work; prior to subsequent pour, remove strip and tighten forms.

J. Construction joints shall show no overlapping or offsetting of concrete surfaces and shall as closely as possible have the same appearance as butted board joints. Joints in a continuous line shall be straight and true.

K. Provide cleanouts as required to permit inspection and thorough cleaning of loose dirt and debris. Cleanouts shall not be apparent on concrete surfaces exposed to view in finished work.

L. Arrange forms to permit proper erection sequence and subsequent form removal without damaging concrete.

M. Whenever concrete bases and foundations are required for equipment furnished as part of the work of other Sections, verify equipment dimensions prior to placing concrete.

N. Forms for concrete surfaces exposed to view in the finished work shall be constructed to match existing concrete finish.

O. Forms for unexposed concrete surfaces shall be undressed lumber, form plywood, or other suitable material.

P. Formwork shall be clean and free of foreign material when concrete is placed.

Page 609 of 1236 ends

SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 4 of 4

3.03 FORM REMOVAL
A. Do not remove forms until concrete has attained sufficient strength to support its own weight and anticipated construction live loads without damage, but in no case less than the following.

1. Walls: Four (4) days

2. Footings, Curbs, Walks, Paving: Side forms may be removed 24 hours after concrete placement.

END OF SECTION

Page 610 of 1236 ends

SECTION 03 20 00 CONCRETE REINFORCEMENT
CONCRETE REINFORCEMENT 03 20 00 - 1 of 3
PART 1 GENERAL

1.01 SUMMARY
A. This section includes the requirements for furnishing and installing concrete reinforcement.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Shop Drawings: Complete bending and placing details of reinforcement.

1. Details of reinforcement not shown on Drawings shall be in conformance with ACI 315 and ACI 318.

2. Detailing, fabricating and spacing of reinforcement shall be in conformance with ACI 315 unless otherwise shown or noted.

B. Test Reports: Certified copies of mill tests showing chemical and physical analyses of each heat or melt from which reinforcement was made.

1.04 QUALITY ASSURANCE
A. Referenced Standards

1. California Building Code (CBC), 2019.

2. ACI 301 – Specifications for Structural Concrete for Buildings

3. ACI 318 – Building Code Requirements for Reinforced Concrete

4. ACI 347R – Guide to Formwork for Concrete

5. CRSI Manual of Standard Practice
B. Allowable Tolerances Fabricating/placing tolerances shall be in conformance with ACI 301.

1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver reinforcement from the mill in securely tied bundles, each bundle limited to one size and grade of reinforcement. Identify each bundle with readily visible metal or plastic tags identifying the reinforcement by the same item marking as on the approved shop

Page 611 of 1236 ends

SECTION 03 20 00 CONCRETE REINFORCEMENT
CONCRETE REINFORCEMENT 03 20 00 - 2 of 3
drawings; tags shall also identify the mill, heat or melt number, and the grade and size of reinforcement.

B. After bundles are broken, identify by segregating reinforcement by sizes and grades.

C. Store reinforcement off the ground, protected from the elements and foreign material which could adversely affect its bond with concrete.

PART 2 PRODUCTS

2.01 MATERIALS
A. Reinforcing Bars: ASTM A625, Grade 60 for all bars except where noted otherwise on plans.

B. Wire for Ties, Stirrups, and Spiral Reinforcement: ASTM A82.

C. Spacers, Bar Supports, and Other Accessories: In conformance with ACI 315. Where portions of accessories will be within 1/2 inch of concrete surfaces which will be exposed to the elements in the finished work, such accessories shall be of non-corrosive material or shall be corrosion-resistant treated; aluminum products will not be acceptable.

2.02 FABRICATION
A. Fabricate reinforcement in accordance with the requirements of ACI 315, where specific details are not shown or where Contract Documents are not more restrictive.

B. Fabrication of reinforcement shall begin only after approval of bar lists and shop drawings, with each item of reinforcement fabricated in conformance with such approved documents.

C. Bend reinforcing steel cold; do not straighten/rebend, doing damage to the material.

PART 3 EXECUTION

3.01 INSTALLATION
A. At time of concrete placement, reinforcement shall be free of dirt, oil, scale, loose rust, and other foreign material that could adversely affect the bond with concrete.

B. Fasten reinforcement/support to prevent displacement beyond the tolerances specified in ACI 301, by construction loads and concrete placement. Sizes and dimensions of supports shall be as required to position the reinforcement as shown on the approved shop drawings and in conformance with the minimum concrete protective covering requirements of ACI 301.

C. Furnish reinforcing bars full length whenever possible; splices will be permitted only where shown or noted on the approved shop drawings, or as otherwise permitted by the Owner.

D. Splices may be made in horizontal reinforcement by lapping and placing ends of bars in contact and securely wiring; or bars may be separated sufficiently to permit the embedment of the entire surface of each bar in concrete.

Page 612 of 1236 ends

SECTION 03 20 00 CONCRETE REINFORCEMENT
CONCRETE REINFORCEMENT 03 20 00 - 3 of 3

1. Locate all splices as per drawings. Lap bars 48 diameters minimum.

2. Stagger splices in adjacent bars.

E. Obstructions: Should items to be embedded in concrete interfere with placement of reinforcements, notify the Owner to obtain written approval of procedure before starting.

F. Concrete Cover: Install reinforcement to achieve the minimum concrete coverage shown or noted on the Drawings, unless otherwise specified.

G. Welding: Reinforcing bars shall not have welded joints.

H. Misplaced Reinforcing Bars:

1. If reinforcing bars are found to be misplaced after concrete placement, immediately notify the Owner for recommendations for correcting the misplacement; perform no corrective measures without such prior recommendations.

2. Redesign, alterations, corrections, and replacement of concrete or reinforcing bars due to misplaced bars shall be performed at no additional expense to the Owner.

3.02 MAINTENANCE OF REINFORCEMENT
A. Continuously inspect/maintain reinforcement in proper position during concreting operations.

B. Where reinforcement cannot otherwise be kept properly aligned, provide additional bracing ties, stirrups, and other items as necessary.

END OF SECTION

Page 613 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 614 of 1236
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 1 of 8
PART 1 GENERAL

1.01 SUMMARY
A. This Section includes the requirements for furnishing and placing cast-in-place concrete, including cast-in-place architectural finish concrete, curing and finishing.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

SUBMITTALS
B. Mix design for each class of concrete proposed for use. If concrete will be pneumatically placed, mixes shall be specifically designed and designated.

C. Laboratory test reports for concrete mixes. Compression test data (field experience method) or results of testing (trial batch method) used to establish mix proportions.

D. Product Data: Manufacturers' and suppliers' proprietary information on materials.

E. Layout Drawings: Submit layout drawings showing proposed locations of construction joints, control joints, details of construction, and connections for approval prior to concrete placement.

F. Submit delivery ticket to Owner for each batch of concrete delivered.

1.03 QUALITY ASSURANCE
A. Reference Standards

1. California Building Code (CBC), 2016.

2. ACI 301 – Specifications for structural Concrete for Buildings.

3. ACI 318 – Building Code Requirements for Reinforced Concrete.

B. Quality Control: Contractor to retain the services of a qualified testing organization as specified in Testing Laboratory Services.

C. Quality Control Supervisor: Owner will retain the services of an independent concrete contractor that will observe Contractor’s work to achieve desired results.

Page 615 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 2 of 8
D. Allowable Tolerances: Deviation from plumb and level shall not exceed 1/8 inch within ten feet in any direction, as determined with a ten-foot straightedge. Cumulative deviation over the length or height of the building shall not exceed 3/8 inch in any direction.

1.04 DELIVERY, STORAGE AND HANDLING
A. Deliver, store, and handle packaged materials in the manufacturers' original, sealed packages, each clearly identified with the manufacturer's name, and name and type of material.

B. Deliver, store, and handle materials subject to damage from dirt and moisture maintaining them clean and dry, off the ground, and suitably protected.

C. Store coarse and fine aggregates in separate, covered bins to prevent them from mixing, and to preserve moisture content of aggregate at batch plant.

D. Store bulk cement in covered bins.

1.05 PROJECT CONDITIONS
A. Environmental Requirements for Concrete Placement:

1. Hot Weather: In conformance with ACI 305.

2. Cold Weather: In conformance with ACI 306.

3. During Precipitation: Do not place unless adequate protection is provided.

PART 2 PRODUCTS

2.01 MATERIALS
A. Concrete, ready-mixed, ASTM C94.

1. Cement: ASTM C150, Type II, Portland Cement.

2. Aggregate:
a. Fine Aggregate: ASTM C33
b. Coarse Aggregate: ASTM C33
c. Source of aggregate shall remain constant for the duration of the work.

3. Water: Clean, clear, and potable.

B. Curing materials:

Page 616 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 3 of 8

1. Liquid Membrane: ASTM C308, Type I.

2. Sheet material: ASTM C171.

C. Admixtures

1. Water reducing Admixture: ASTM C494, only with prior review of mix design.

2. Air-Entraining Admixture: ASTM C260, for lightweight concrete only with prior review of mix design.

3. Unspecified Admixtures: Not Permitted.

4. Calcium Chloride: not Permitted.

5. Hydrogen Chloride: Not Permitted
D. Non-shrink Grout: Premixed, requiring only addition of specified water; Master Builders "Masterflow 928," or approved equal.

1. Flowable, low shrinkage, 5,000 psi at 7 days.

2. Non-metallic Type: For all uses.

3. Metalic Type: Will not be permitted.

E. Bonding Agent: Larsen Products Corp. "Weld-Crete," Sika Chemical Corp. "Sikastix 370" or "Sikadur Hi-Mod," or approved equal.

F. Hardener: Clear, dust-on type; Sonneborn-Contech "Harcol Standard Natural," Upco Co. "Hydroment," Lambert Corp. "Colorhard," or approved equal.

G. Sealer: Heavy penetrating type, from same manufacturer as hardener.

1. Without wax or other constituent that will impair application of finishes.

H. Epoxy Grout for Reinforcement and Bolt Installation: Hilti "HIT-RE 500-SD” Adhesive Anchor System", Simpson Strong-Tie “SET XP”, or equal.

I. Detectable Warning - Truncated Domes & Nosing:

1. Spacing, height and configuration of truncated domes shall meet CBC 11B-705.

Base diameter of 0.9 inch min. and 0.92 inch max, a top diameter of 0.45 inch minimum and 0.47 inch maximum, and a height of 0.2 inch. Dome spacing shall have center to center 2.3 inch min. and 2.4 inch max., and a base-to-base spacing of 0.65 inch minimum.

2. Amstep Model 224A, 2-3/8 inches wide, and meets the California Title 24 code for the visually impaired. Tread 5/16 inch thick with continuous arrow profile anchor 5/8 inch deep. The abrasive filler shall consist of a mixture of aluminum

Page 617 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 4 of 8
oxide and silicon granules in an epoxy resin and hardener mixture and locked into an extruded base, alloy 6063-T6. Coefficient of friction 1.02 dry, 0.98 wet per ASTM F 609. Abrasive filler color as selected.

2.02 MIXES
A. Design Criteria

1. Concrete shall develop the minimum compressive strength noted on the Contract Documents at 28 days on cylinders made and tested in accordance with referenced ASTM standards.

2. The average of the sets of three consecutive strength tests shall be equal to or greater than the specified strength, and no individual strength test results shall fall below the specified strength by more than 500 psi.

B. General

1. Mix designs shall be in conformance with CBC Section 1905, based on materials tested and approved by the Testing Laboratory.

2. If concrete will be pneumatically placed, mixes shall be specifically so designed and designated.

3. If concrete is to be pumped, mixes shall be specifically so designed and designated.

C. Nonshrink Grout: Mix in accordance with the manufacturer’s printed instructions.

D. Dry Pack: Mix, in proportions by volume, one-part cement to two-and-one-half parts fine aggregate, screening out materials retained on a No. 4 sieve. Mix with water to a consistency so that when a ball of mixture is compressed in the hand, it will show finger marks but maintain its shape and not show any surface water.

E. Patching Mortar: Mix in proportion by volume, one part cement to two parts fine aggregate.

2.03 MIXING
A. Batch Plant:

1. Equipment and plant shall be capable of weighing, segregating, and efficiently handling materials. Automatic metering capable of determining moisture content of sand shall be utilized.

2. Equipment and plant shall be subject to the approval of the Testing Laboratory; equipment and processes not so approved shall not be used for the work.

B. General:

Page 618 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 5 of 8

1. Mixing shall be in conformance with ASTM C94 and CBC.

2. Mix cement, fine and coarse aggregate, admixtures, and water to exact proportions of approved mix designs.

3. Measure fine and coarse aggregates separately according to approved method which affords accurate control and checking.

4. Adjust grading to improve workability; do not add water unless otherwise recommended by the Owner.

C. Admixtures: use automatic metering dispenser to incorporate admixtures into mix

2.04 CONCRETE CLASSES
A. Definitions:

1. Strength: Minimum compressive strength after 28 days, when tested in accordance with ASTM C39.

2. Aggregate: Maximum size.

3. Weight: Pounds per cubic foot, air dry.

4. Slump: When tested in accordance with ASTM C143.

5. Maximum water/ cement ratio of 0.45
B. Concrete Classes and Uses:

Class Weight (psf) Strength (psi) Aggregate
(inches)
Use
A
B
145
110
4000
3000
3/4
5/8
Cast-In-Place Concrete,
Concrete Foundations,
Concrete Slabs, etc.

Sand Lightweight Concrete
over metal deck
PART 3 EXECUTION

3.01 PREPARATION
A. Prior to concrete placement, determine finishes required to accommodate the work of other sections, and prepare for such finishes. Where determination for such finishes may be in question, refer to Owner for resolution.

B. Remove loose dirt/foreign material from excavations and forms and standing and saturated soil from excavations and cavities. Placing concrete in standing water is not permitted.

Page 619 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 6 of 8
C. Thoroughly clean reinforcement and other items to be embedded in concrete of loose rust and other foreign matter which could inhibit bond with concrete.

D. Thoroughly wet wood forms, except coated plywood, and adjacent concrete a minimum of one hour prior to placing concrete; securely close cleanout and inspection ports; repeat wetting as required to keep forms damp.

E. Work form release agent into all areas of form liner as recommended by form manufacturer.

F. Apply form release agent to form liners before each use and within the same day that concrete is placed.

G. Subgrade and forms shall have been checked for line and grade, and work areas shall have been inspected by Engineer and observed by the Owner prior to starting concrete placement.

H. Roughen surfaces +/- ¼” amplitude at all joints and at all contact surfaces between new and existing concrete. Provide shear keys and prepare joints as per Drawings and Specifications. Apply bonding agent between existing and new concrete pours.

3.02 TRANSPORTING
A. Transport concrete from the mixer to the place of final deposit as quickly as possible, and by methods which prevent the separation and loss of ingredients. Concrete shall be of uniform density when placed.

B. Concrete shall not be freely dropped where reinforcement will cause segregation. Spouts, elephant trunks, or other approved means shall be utilized to prevent segregation.

C. In no case shall concrete be freely dropped more than six (6) feet. Provide formwork with pour ports at four (4) feet or closer horizontally so that concrete will be deposited freely such that no more than six (6) feet is dropped at any location.

D. Concrete may be pumped from the mixer to the place of deposit, provided that information on mix design adjustments, equipment, and procedures have received the Owner’s written approval.

3.03 PLACING
A. General:

1. Notify Owner a minimum of 72 hours prior to each major concrete placement.

2. Place concrete in a continuous operation until a section of approved size and shape has been completed.

3. For horizontal surfaces, maintain a plastic surface essentially horizontal until completion of placement of the section.

Page 620 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 7 of 8

4. Prevent displacement of reinforcement and other items to be embedded.

5. Before concrete sets, completely remove concrete spilled on forms and reinforcement in sections where concrete is not to be immediately installed.

6. An interruption of more than 60 minutes in concrete placement will be cause for shutting down the work and disposing of remaining mixed concrete. If such interruption occurs, provide construction joints where and as instructed, and cut concrete back to such line, cleaning forms and reinforcement as specified.

7. Record the date and time of concrete placement in each section. Retain records until completion of the work and make available at all times to the review of the Owner.

B. Consolidation:

1. Thoroughly consolidate concrete by puddling with suitable tools during placement, and by thoroughly working around reinforcement and other embedded items.

2. In addition to manual spading and tamping, internally vibrate concrete with highspeed mechanical vibrators of sufficient amplitude for thorough consolidation.

3. Prevent formation of shoulders and ledges.

4. Provide keys across vertical joints as shown on drawings. Place dowels across joints.

5. Joints for Slabs on Grade: Locate construction joints where approved and under partitions, whenever possible.

3.04 PROTECTION AND CURING
A. Protection:

1. Maintain concrete temperature above 50 degrees F during curing.

2. Protect concrete from sun and rain.

3. Do not subject concrete to loads until it has completely cured and attained minimum 28-day strength.

4. Water cure concrete continuously for minimum duration specified, including Saturdays, Sundays, and holidays; do not permit it to dry out until it has cured for the specified time.

5. Protect concrete during/after curing from damage from construction operations.

Page 621 of 1236 ends

SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 8 of 8

6. Cover traffic areas with kraft paper and plywood sheets; maintain protective covering in place and in good repair as long as necessary to protect concrete from damage.

7. Keep finished areas free from traffic for a minimum of four days, or as long as necessary for concrete to have set sufficiently to prevent its being damaged.

B. Curing: Curing shall immediately follow finishing and shall be performed as follows.

1. Flatwork Surfaces: Membrane cure for a minimum of seven days.

3.05 DEFECTIVE CONCRETE
A. Repair or replace defective concrete as instructed by Owner, and at no additional expense to Owner. Repair materials shall include, as necessary, cements, aggregates, admixtures, and epoxy.

B. With written approval of Owner, some minor defective work may be repaired by use of cement mortar; however, if the defects affect the strength of the structure, its appearance, or are otherwise detrimental, Owner may require the removal and replacement of that portion of the structure.

END OF SECTION

Page 622 of 1236 ends

SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 1 of 5
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes:

1. This Section includes a self-leveling underlayment that consists of a blend of Portland cement and other hydraulic cements and polymers that is used to level and smooth interior concrete, terrazzo, well-bonded ceramic & quarry tile, epoxy coating systems, wood, metal and properly prepared, non-water-soluble adhesive residue on concrete prior to the installation of finish flooring on all grade levels.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCES
A. ASTM C109M, Compressive Strength Air-Cure Only
B. ASTM C348, Flexural Strength of Hydraulic-Cement Mortars C. ASTM F2170, Relative Humidity in Concrete Floor Slabs Using in situ Probes D. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

1.04 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used. Include manufacturer’s Safety Data Sheets.

B. Qualification Data: For Installer

1.05 QUALITY ASSURANCE
A. Installation of the product must be completed by a factory-trained applicator using mixing equipment and tools approved by the manufacturer.

B. Product must have a hydraulic cement-based inorganic binder content as the primary binder which includes portland cement per ASTM C150: Standard Specification for Portland Cement and other specialty hydraulic cements. Gypsum-based products are not acceptable.

Page 623 of 1236 ends

SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 2 of 5
C. Manufacturer Experience: Provide products of this section by companies which have successfully specialized in production of this type of work for not less than 10 years.

Contact Manufacturer Representative prior to installation.

1.06 WARRANTY
A. Contact Manufacturer for comprehensive warranty, depending on the system installed.

1.07 DELIVERY, STORAGE AND HANDLING
A. Deliver products in original packaging, labeled with product identification, manufacturer, batch number and shelf life.

B. Store products in a dry area with temperature maintained between 50° and 85°F (10° and 29°C) and protect from direct sunlight.

C. Handle products in accordance with manufacturer's printed recommendations.

1.08 CONDITIONS
A. Do not install material below 50°F (10°C) surface and air temperatures. These temperatures must also be maintained during and for 48 hours after the installation of products included in this section. Install quickly if the substrate is warm and follow warm weather instructions per Manufacturer’s instructions.

PART 2 PRODUCTS

2.01 MATERIAL
A. Hydraulic Cement-Based Self-Leveling Underlayment

1. Basis-of-Design Products or approved equal:
a. ARDEX K 15; Manufactured by ARDEX AMERICAS, USA, (724) 203-5000, www.ardexamericas.com
i. Primer:
1) Standard Absorbent Concrete: ARDEX P 51 Primer
2) Extremely Absorbent Concrete: May require two
applications of ARDEX P 51 to minimize the potential
for pinholes forming in the ARDEX K 15.
3) Wood: ARDEX P 82 Ultra Prime
4) Metal: ARDEX EP 2000 Substrate Preparation Epoxy
Primer
5) Other Non-Porous Substrates (burnished concrete,
terrazzo, well- bonded ceramic, quarry and porcelain
tiles, epoxy coating systems and non-water soluble
adhesive residue on concrete and concrete treated with

Page 624 of 1236 ends

SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 3 of 5
silicate compounds): ARDEX P 82 Ultra Prime
ii. Performance and Physical Properties: Meet or exceed the following values for material cured at 73° F+/-3°F (23° C+/-3°C) and 50% +/-5% relative humidity:
1) Application: Barrel Mix or Pump
2) Flow Time: 10 minutes
3) Walkable: 2 to 3 hours
4) Compressive Strength: 5,500 psi (385 kg/cm2) at 28
days, ASTM C109M
5) Flexural Strength: 1,200 psi (84 kg/cm2) at 28 days, ASTM C348
6) VOC: 0

2.02 WATER
A. Water shall be clean, potable, and sufficiently cool (not warmer than 70°F).

PART 3 EXECUTION

3.01 PREPARATION
A. General: Prepare substrate in accordance with manufacturer’s instructions.

1. Concrete:
a. Prior to proceeding please refer to ASTM F710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring. All concrete subfloors must be sound, solid, clean, and free of all oil, grease, dirt, curing compounds and any substance that might act as a bond breaker before priming. Mechanically clean if necessary using shot blasting or other. Acid etching and the use of sweeping compounds and solvents are not acceptable.
b. Substrates shall be inspected in accordance with ASTM F2170 and corrected for moisture or any other conditions that could affect the performance of the underlayment or the finished floor covering. For areas where moisture vapor emissions exceed the required limits coordinate with Basis-of-Design Manufacturer to install an appropriate Moisture Control System.

B. Crack and Joint Preparation:

1. Moving Joints and Moving Cracks – honor all expansion, isolation joints and moving cracks up through the underlayment. Install a flexible sealing compound per Basis-of Design Manufacturer’s instructions.

Page 625 of 1236 ends

SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 4 of 5

2. Saw Cuts, Dormant Control Joints and Dormant Cracks – fill all dormant control joints and dormant cracks with a Low Viscosity Rigid Polyurethane Crack & Joint Repair or Cement-Based Finish Underlayment as recommended by the manufacturer.

C. Wooden subfloors: The wood subfloor either must be solid hardwood flooring; a minimum of 3/4” (19 mm) tongue-and-groove, APA-rated Type 1, exterior exposure plywood; or an approved OSB equivalent. The wood subfloor must be constructed according to prevailing building codes and must be solid and securely fixed to provide a rigid base free of undue flex. Any boards exhibiting movement must be refastened to create a sound, solid subfloor. The wood must be clean and free of all foreign matter. If necessary, sand down to bare wood. Vacuum to remove all dust. Do not use solvent, strippers or cleaners.

Open joints should be filled as recommended by the Basis-of-Design manufacturer. It is the responsibility of the installation contractor to ensure that the wood subfloor is thoroughly clean and properly anchored prior to installation.

D. Metal subfloors: Metal subfloors must be rigid, well supported, properly anchored and free of undue flex and vibration. They must also be clean and free of all rust, corrosion and foreign matter.

1. Non-lead metal substrates must be mechanically cleaned and profiled to create a bonding surface. Please note that care must be taken when mechanically preparing thin metal foils so that the metal foil is not compromised. Use an #80 or #100 grit sanding screen to mechanically profile the metal surface. A hand or floor sander may be used. After sanding, thoroughly deep vacuum to remove all loose material, and then wipe the metal using a clean, white cloth dampened with 91% isopropyl alcohol. Repeat wiping using a new cloth on each pass until the degree of discoloration on the cloth remains consistent on subsequent passes (typically, approx. 5 – 7 passes). Lightly shot blasting also is suitable. From this point until the metal has been primed, disposable shoe covers should be worn by anyone traversing the surface of the prepared metal. Allow 15 – 20 minutes for residual alcohol to evaporate before proceeding. Contact the Technical Service Department for guidelines on preparing lead substrates.

E. Adhesive residues on concrete must first be tested to make certain they are not watersoluble. Water-soluble adhesives must be completely mechanically removed down to clean concrete. Non- water-soluble adhesives should be prepared to a thin, well-bonded residue using the wet-scraping technique as recommended by the Resilient Floor Covering Institute (www.rfci.com). The prepared residue should appear as nothing more than a transparent stain on the concrete after scraping.

F. Non-porous subfloors such as ceramic, porcelain and quarry tile, burnished concrete, epoxy coating systems as well as terrazzo should be clean and free of all waxes, sealers, dust, dirt, debris and any other contaminant that may act as a bond breaker. If necessary, clean by mechanical methods such as shot blasting.

3.02 APPLICATION
A. Examine substrates and conditions under which materials will be installed. Do not proceed with installation until unsatisfactory conditions are corrected.

B. Coordinate installation with adjacent work to ensure proper sequence of construction.

Protect adjacent areas from contact due to mixing and handling of materials.

C. Priming: Comply with manufacturer’s printed instructions

Page 626 of 1236 ends

SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 5 of 5
D. Mixing: Comply with manufacturer's printed instructions and the following.

1. For pump installations, the hydraulic cement underlayment shall be mixed using the Manufacturer’s recommended Automatic Mixing Pumps.

E. Application: Comply with manufacturer's printed instructions and the following:

1. Installations over metal and other non-porous substrates should be limited to a thickness of 1/2” (12.7 mm) unless otherwise approved by the Basis-of-Design Manufacturer. For all other substrates, self-leveling underlayment must be installed at a minimum thickness of 1/8” (3 mm) over the highest point in the floor, which typically results in an average thickness of 1/4” (6 mm) or more over the entire floor. Self-leveling underlayment can be installed up to 1 1/2” (4 cm) over large areas neat, and up to 5” (12.7 cm) with the addition of proper aggregate. Featheredge to match existing elevations. Confer with the Basis-ofDesign Manufacturer if a true featheredge is needed.

2. Pour or pump the liquid and spread into place with Spreader. Immediately use the Smoother to smooth the surface. Wear non- metallic cleats to avoid leaving marks in the liquid.

3. Wood subfloors require mesh-reinforced Resilient Emulsion Underlayment System. After priming, install 3.4 galvanized diamond metal lath by stapling to the wooden subfloor approximately every 6 inches to center.

4. Metal subfloors require Resilient Emulsion Underlayment System.

F. Curing

1. Finished product can be walked on in 2-3 hours. Moisture-insensitive tiles such as ceramic, quarry and porcelain can be installed after 6 hours. All other finish floor coverings can be installed after 16 hours at 70°F (21°C). For resinous systems such as epoxy and polyurethane floors please contact the Basis-ofDesign Manufacturer.

3.03 FIELD QUALITY CONTROL
A. Where specified, field sampling of the underlayment is to be done by taking an entire unopened bag of the product being installed to an independent testing facility to perform compressive strength testing in accordance with ASTM C 109/modified: air-cure only.

There are no in situ test procedures for the evaluation of compressive strength.

3.04 PROTECTION
A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, Masonite or other suitable protection course.

END OF SECTION

Page 627 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 628 of 1236
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 1 of 5
PART 1 GENERAL

1.01 DESCRIPTION:

A. This section specifies structural steel shown and classified by Section 2, Code of Standard Practice for Steel Buildings and Bridges.

1.02 RELATED WORK:

A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 QUALITY ASSURANCE:

A. Fabricator and erector shall maintain a program of quality assurance in conformance with Section 8, Code of Standard Practice for Steel Buildings and Bridges. Work shall be fabricated in an AISC certified Category Std fabrication plant.

B. Before authorizing the commencement of steel erection, the controlling contractor shall ensure that the steel erector is provided with the written notification required by 29 CFR 1926.752. Provide copy of this notification to the Resident Engineer.

1.04 TOLERANCES:

A. Fabrication tolerances for structural steel shall be held within limits established by ASTM A6, by AISC 303, Sections 6 and 7, Code of Standard Practice for Buildings and Bridges, except as follows:

B. Elevation tolerance for closure plates at the building perimeter and at slab openings prior to concrete placement is 6 mm (1/4 inch).

1.05 REGULATORY REQUIREMENTS:

A. AISC 360: Specification for Structural Steel Buildings B. AISC 303: Code of Standard Practice for Steel Buildings and Bridges.

1.06 SUBMITTALS:

A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples,
B. Shop and Erection Drawings: Complete
C. Certificates:

1. Structural steel.

Page 629 of 1236 ends

SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 2 of 5

2. Steel for all connections.

3. Welding materials.

D. Test Reports:

1. Welders' qualifying tests.

E. Design Calculations and Drawings:

1. Connection calculations, if required.

F. Record Surveys.

1.02 APPLICABLE PUBLICATIONS:

A. Publications listed below form a part of this specification to extent referenced.

Publications are referenced in text by basic designation only.

B. American Institute of Steel Construction (AISC):

1. AISC 360-10 Specification for Structural Steel Buildings

2. AISC 303-10 Code of Standard Practice for Steel Buildings and Bridges C. American National Standards Institute (ANSI):

B18.22.1-65(R2008)................... Plain Washers
B18.22M-81(R2000)................... Metric Plain Washers D. American Society for Testing and Materials (ASTM):

A6/A6M-11 ................................. Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
A36/A36M-08 ............................. Standard Specification for Carbon Structural Steel A53/A53M-10 ............................. Standard Specification for Pipe, Steel, Black and HotDipped, Zinc-Coated Welded and Seamless A123/A123M-09 ......................... Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
A242/A242M-04(R2009) ............ Standard Specification for High-Strength Low- Alloy Structural Steel

Page 630 of 1236 ends

SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 3 of 5
A283/A283M-03(R2007) ............ Standard Specification for Low and Intermediate Tensile Strength Carbon Steel Plates
A307-10. ..................................... Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength
A325-10 ...................................... Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
A490-12 ...................................... Standard Specification for Heat-Treated Steel Structural Bolts 150 ksi Minimum Tensile Strength
A500/A500M-10a. ...................... Standard Specification for Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and
Shapes
A501-07 ...................................... Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
A572/A572M-07 ......................... Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel A992/A992M-11………Standard Specification for Structural Steel Shapes
E. American Welding Society (AWS):

D1.1/D1.1M-10 ........................... Structural Welding Code-Steel F. Research Council on Structural Connections (RCSC) of The Engineering Foundation:

Specification for Structural Joints Using ASTM A325 or A490 Bolts G. Military Specifications (Mil. Spec.):

MIL-P-21035 .............................. Paint, High Zinc Dust Content, Galvanizing, Repair H. Occupational Safety and Health Administration (OSHA):
29 CFR Part 1926-2001 ............. Safety Standards for Steel Erection PART 2 PRODUCTS

2.01 MATERIALS:

A. Structural Steel: ASTM A572 W Shapes, A36 misc. steel

Page 631 of 1236 ends

SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 4 of 5
B. Structural Tubing: ASTM A500, Grade B.

C. Steel Pipe: ASTM A53, Grade B.

D. Bolts, Nuts and Washers:

1. High-strength bolts, including nuts and washers: ASTM A325 or A490 as noted.

2. Bolts and nuts, other than high-strength or as shown on plans: ASTM A307, Grade A.

3. Plain washers, other than those in contact with high-strength bolt heads and nuts:

ANSI Standard B18.22.1.

E. Zinc Coating: ASTM A123.

F. Galvanizing Repair Paint: Mil. Spec. MIL-P-21035.

PART 3 EXECUTION

3.01 CONNECTIONS (SHOP AND FIELD):

A. Welding: Welding in accordance with AWS D1.1. Welds shall be made only by welders and welding operators who have been previously qualified by tests as prescribed in AWS D1.1 to perform type of work required.

B. High-Strength Bolts: High-strength bolts tightened to a bolt tension not less than 70% of their minimum tensile strength. Tightening done with properly calibrated wrenches, by turn-of-nut method or by use of direct tension indicators (bolts or washers). Tighten bolts in connections identified as slip-critical using Direct Tension Indicators. Twist-off torque bolts are not an acceptable alternate fastener for slip critical connections.

3.02 FABRICATION:

A. Fabrication in accordance with Chapter M, AISC 360.

3.03 SHOP PAINTING:

A. General: Shop paint steel with primer in accordance with AISC 303, Section 6.

B. Do not apply paint to following:

1. Surfaces within 50 mm (2 inches) of joints to be welded in field.

2. Surfaces which will be encased in concrete.

3. Surfaces which will receive sprayed on fireproofing.

4. Top flange of members which will have shear connector studs applied.

C. Structural steel in the interstitial space that does not receive sprayed on fireproofing shall be painted with primer in accordance with general requirement of shop painting.

Page 632 of 1236 ends

SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 5 of 5

3.04 ERECTION:

A. General: Erection in accordance with AISC 303, Section 7B.

B. Temporary Supports: Temporary support of structural steel frames during erection in accordance with AISC 303, Section 7

3.05 FIELD PAINTING:

A. After erection, touch-up steel surfaces specified to be shop painted. After welding is completed, clean and prime areas not painted due to field welding.

B. Finish painting of steel surfaces is specified in Section 09 91 00, PAINTING.

3.06 SURVEY:

A. Upon completion of finish bolting or welding on any part of the work, and prior to start of work by other trades that may be supported, attached, or applied to the structural steel work, submit a certified report of survey to Resident Engineer for approval.

Reports shall be prepared by Registered Land Surveyor or Registered Civil Engineer as specified in Section 01 00 00, GENERAL REQUIREMENTS. Report shall specify that location of structural steel is acceptable for plumbness, level and alignment within specified tolerances specified in the AISC Manual.

END OF SECTION

Page 633 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 634 of 1236
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 1 of 11
PART 1 GENERAL

1.01 SUMMARY
A. This section specifies items and assemblies fabricated from structural steel shapes and other materials as shown and specified.

B. Items specified.

1. Support for Wall and Ceiling Mounted Items

2. Metal Railings

3. Bollards

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Shop Drawings:

1. Each item specified, showing complete detail, location in the project, material and size of components, method of joining various components and assemblies, finish, and location, size and type of anchors.

2. Mark items requiring field assembly for erection identification and furnish erection drawings and instructions.

3. Provide templates and rough-in measurements as required.

C. Furnish setting drawings and instructions for installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction.

1.04 QUALITY ASSURANCE
A. Each product type shall be the same and be made by the same manufacturer.

B. Assemble product to the greatest extent possible before delivery to the site.

Page 635 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 2 of 11
C. Include additional features, which are not specifically prohibited by this specification, but which are a part of the manufacturer's standard commercial product.

1.05 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.

The publications are referenced in the text by the basic designation only.

B. American Society of Mechanical Engineers (ASME):

B18.2.2-87(R2005)....... Square and Hex Nuts
C. American Society for Testing and Materials (ASTM):

A36/A36M-08 ................ Structural Steel
A47-99(R2009) .............. Malleable Iron Castings
A53-10 ........................... Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless
A123-09 ......................... Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products A307-10 ......................... Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength A653/A653M-10 ............ Steel Sheet, Zinc Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the Hot-Dip Process
A786/A786M-09 ............ Rolled Steel Floor Plate
C1107-08 ...................... Packaged Dry, Hydraulic-Cement Grout (Non-shrink) F436-10 ......................... Hardened Steel Washers F1667-11 ....................... Driven Fasteners: Nails, Spikes and Staples D. American Welding Society (AWS):

D1.1-10 ......................... Structural Welding Code Steel D1.3-08 ......................... Structural Welding Code Sheet Steel E. National Association of Architectural Metal Manufacturers (NAAMM) AMP 521-01 .................. Pipe Railing Manual
AMP 500-06 .................. Metal Finishes Manual
Structural Steel Painting Council (SSPC)/Society of Protective Coatings:

SP 1-04 ......................... No. 1, Solvent Cleaning SP 2-04 ......................... No. 2, Hand Tool Cleaning SP 3-04 ......................... No. 3, Power Tool Cleaning

Page 636 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 3 of 11

1.06 DESIGN CRITERIA
A. In addition to the dead loads, design fabrications to support the following live loads unless otherwise specified.

B. Ladders and Rungs: 120 kg (250 pounds) at any point.

C. Railings and Handrails: 900 N (200 pounds) in any direction at any point.

PART 2 PRODUCTS

2.01 MATERIALS
A. Structural Steel: ASTM A36.

B. Floor Plate:

1. Steel ASTM A786.

2. Aluminum: ASTM B632.

C. Steel Pipe: ASTM A53.

1. Galvanized for exterior locations.

2. Coated for interior locations, see SECTION 09 06 00 for coating.

D. Cast-Iron: ASTM A48, Class 30, commercial pattern.

E. Grout: ASTM C1107, pourable type.

F. Steel Pipe (Bollard): ASTM A53.

1. Galvanized for exterior locations.

2. Type S, Grade A unless specified otherwise.

3. NPS (inside diameter) as shown.

2.02 HARDWARE
A. Rough Hardware:

1. Furnish rough hardware with a standard plating, applied after punching, forming and assembly of parts; galvanized, cadmium plated, or zinc-coated by electrogalvanizing process. Galvanized G-90 where specified.

2. Use G90 galvanized coating on ferrous metal for exterior work unless nonferrous metal or stainless is used.

B. Fasteners:

1. Bolts with Nuts:

Page 637 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 4 of 11
a. ASTM A307 for 415 MPa (60,000 psi) tensile strength bolts. b. ASTM F593 for stainless steel.
c. Screws: ASME B18.6.1.
d. Washers: ASTM F436, type to suit material and anchorage. e. Nails: ASTM F1667, Type I, style 6 or 14 for finish work.

2.03 FABRICATION GENERAL
A. Material

1. Use material as specified. Use material of commercial quality and suitable for intended purpose for material that is not named or its standard of quality not specified.

2. Use material free of defects which could affect the appearance or service ability of the finished product.

B. Size:

1. Size and thickness of members as shown.

2. When size and thickness is not specified or shown for an individual part, use size and thickness not less than that used for the same component on similar standard commercial items or in accordance with established shop methods.

C. Connections

1. Except as otherwise specified, connections may be made by welding, riveting or bolting.

2. Field riveting will not be approved.

3. Design size, number and placement of fasteners, to develop a joint strength of not less than the design value.

4. Holes, for rivets and bolts: Accurately punched or drilled and burrs removed.

5. Size and shape welds to develop the full design strength of the parts connected by welds and to transmit imposed stresses without permanent deformation or failure when subject to service loadings.

6. Use Rivets and bolts of material selected to prevent corrosion (electrolysis) at bimetallic contacts. Plated or coated material will not be approved.

7. Use stainless steel connectors for removable members machine screws or bolts.

D. Fasteners and Anchors

1. Use methods for fastening or anchoring metal fabrications to building construction as shown or specified.

Page 638 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 5 of 11

2. Where fasteners and anchors are not shown, design the type, size, location and spacing to resist the loads imposed without deformation of the members or causing failure of the anchor or fastener, and suit the sequence of installation.

3. Use material and finish of the fasteners compatible with the kinds of materials which are fastened together and their location in the finished work.

4. Fasteners for securing metal fabrications to new construction only, may be by use of threaded or wedge type inserts or by anchors for welding to the metal fabrication for installation before the concrete is placed or as masonry is laid.

5. Fasteners for securing metal fabrication to existing construction or new construction may be expansion bolts, toggle bolts, power actuated drive pins, welding, self-drilling and tapping screws or bolts.

E. Workmanship

1. General:
a. Fabricate items to design shown.
b. Furnish members in longest lengths commercially available within the limits shown and specified.
c. Fabricate straight, true, free from warp and twist, and where applicable square and in same plane.
d. Provide holes, sinkages and reinforcement shown and required for fasteners and anchorage items.
e. Provide openings, cut-outs, and tapped holes for attachment and clearances required for work of other trades.
f. Prepare members for the installation and fitting of hardware. g. Cut openings in gratings and floor plates for the passage of ducts, sumps, pipes, conduits and similar items. Provide reinforcement to support cut edges.
h. Fabricate surfaces and edges free from sharp edges, burrs and projections which may cause injury.

2. Welding:
a. Weld in accordance with AWS.
b. Welds shall show good fusion, be free from cracks and porosity and accomplish secure and rigid joints in proper alignment. c. Where exposed in the finished work, continuous weld for the full length of the members joined and have depressed areas filled and protruding welds finished smooth and flush with adjacent surfaces. d. Finish welded joints to match finish of adjacent surface.

Page 639 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 6 of 11

3. Joining:
a. Miter or butt members at corners.
b. Where frames members are butted at corners, cut leg of frame member perpendicular to surface, as required for clearance.

4. Cutting and Fitting:
a. Accurately cut, machine and fit joints, corners, copes, and miters. b. Fit removable members to be easily removed.
c. Design and construct field connections in the most practical place for appearance and ease of installation.
d. Fit pieces together as required.
e. Fabricate connections for ease of assembly and disassembly without use of special tools.
f. Joints firm when assembled.
g. Conceal joining, fitting and welding on exposed work as far as practical. h. Do not show rivets and screws prominently on the exposed face. i. The fit of components and the alignment of holes shall eliminate the need to modify component or to use exceptional force in the assembly of item and eliminate the need to use other than common tools.

F. Finish:

1. Finish exposed surfaces in accordance with NAAMM Metal Finishes Manual.

2. Aluminum: NAAMM AMP 501.
a. Mill finish, AA-M10, as fabricated, use unless specified otherwise. b. Clear anodic coating, AA-C22A41, chemically etched medium matte, with Architectural Class 1, 0.7 mils or thicker.
c. Colored anodic coating, AA-C22A42, chemically etched medium matte with Architectural Class 1, 0.7 mils or thicker.
d. Painted: AA-C22R10.

3. Steel and Iron: NAAMM AMP 504.
a. Zinc coated (Galvanized): ASTM A123, G90 unless noted otherwise. b. Surfaces exposed in the finished work:
1) Finish smooth rough surfaces and remove projections.

Page 640 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 7 of 11
2) Fill holes, dents and similar voids and depressions with epoxy type patching compound.
c. Shop Prime Painting:
1) Surfaces of Ferrous metal:
a) Items not specified to have other coatings.
b) Galvanized surfaces specified to have prime paint.
c) Remove all loose mill scale, rust, and paint, by hand or power tool cleaning as defined in SSPC-SP2 and SP3.
d) Clean of oil, grease, soil and other detrimental matter by use of solvents or cleaning compounds as defined in
SSPC-SP1.
e) After cleaning and finishing apply one coat of primer as specified in Section 09 90 00, PAINTING.

4. Stainless Steel: NAAMM AMP-504 Finish No. 4.

G. Protection:

1. Spot prime all abraded and damaged areas of zinc coating which expose the bare metal, using zinc rich paint on hot-dip zinc coat items and zinc dust primer on all other zinc coated items.

2.04 SUPPORTS
A. General:

1. Fabricate ASTM A36 structural steel shapes where shown.

2. Use clip angles or make provisions for welding hangers and braces to overhead construction.

3. Field connections may be welded or bolted.

B. For Wall Mounted Items:

1. For items supported by metal stud partitions.

2. Steel strip minimum of 150 mm (6 inches) wide, length extending one stud space beyond end of item supported.

C. For Trapeze Bars:

1. Construct assembly above ceilings as shown and design to support not less than a 340 kg (750 pound) working load at any point.

2. Fabricate trapeze supports as shown, with all exposed members, including screws, nuts, bolts and washers, fabricated of stainless steel.

Page 641 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 8 of 11

3. Continuously weld connections where welds shown.

4. Use modular channel where shown with manufacturers bolts and fittings.

2.05 GATE HINGES LATCH AND STOP
A. Manufacturer: Tymetal, Hoover Fence Co., or approved equal B. Galvanized ASTM A123, G-90 after fabrication.

C. Doors:

1. Provide pre-fabricated steel hinged door and frame as shown.

2. Color: to match fence color

3. Hardware:
a. Install lock or latch specified in Section 08 71 00, DOOR HARDWARE.

2.06 METAL RAILING
A. In addition to the dead load design railing assembly to support live load specified.

B. Fabrication General:

1. Provide continuous welded joints, dressed smooth and flush.

2. Standard flush fittings, designed to be welded, may be used.

3. Exposed threads will not be approved.

4. Form handrail brackets to size and design shown.

5. Interior Post Anchors:
a. Provide flanged fittings for securing fixed posts to floor with expansion bolts, unless shown otherwise.
b. Weld or thread flanged fitting to posts at base.
c. For securing removable posts to floor, provide close fitting sleeve insert or inverted flange base plate with stud bolts or rivets concrete anchor welded to the base plate.
d. Provide sliding flange base plate on posts secured with set screws. e. Weld flange base plate to removable posts set in sleeves.

C. Handrails:

1. Close free ends of rail with flush metal caps welded in place except where flanges for securing to walls with bolts are shown.

Page 642 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 9 of 11

2. Make provisions for attaching handrail brackets to wall, posts, and handrail as shown.

D. Aluminum Railings:

1. Fabricate from extruded aluminum.

2. Use tubular posts not less than 3 mm (0.125 inch) wall thickness for exterior railings.

3. Punch intermediate rails and bottom of top rails for passage of posts and machine to a close fit.

4. Where shown use extruded channel sections for top rail with 13 mm (1/2 inch) thick top cover plates and closed ends.

5. Fabricate brackets of extruded or wrought aluminum as shown.

6. Fabricate stainless pipe sleeves with closed bottom at least six inches deep having internal dimensions at least 13 mm (1/2 inch) greater than external dimensions of posts where set in concrete.

2.06 METAL LADDER
A. Aluminum Ladders:

1. Fixed-rail type, constructed of structural aluminum, with mill finish.

2. Fabricate side rails and rungs of size and design shown, with the rungs shouldered and headed into and welded to the rails.

3. Where shown fabrication side rails curved, twisted and formed into gooseneck.

4. Fabricate angle brackets at top and bottom and intermediate brackets where shown. Drill for bolting.

B. Ladder Rungs:

1. Fabricate from 25 mm (one inch) diameter steel bars.

2. Fabricate so that rungs will extend at least 100 mm (4 inches) into wall with ends turned 50 mm (2 inches), project out from wall 175 mm (7 inches), be 400 mm (16 inches) wide and be designed so that foot cannot slide off end.

3. Galvanized after fabrication, ASTM A123, G-90 rungs for exterior use and for access to pits.

2.07 STEEL PIPE BOLLARD
A. Provide bollard in accordance with ASTM A53 with dimensions as shown in standard detail SD320523-04. Anchor posts in concrete and fill solidly with concrete with a minimum compressive strength of 17 MPa 2500psi.

Page 643 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 10 of 11
PART 3 EXECUTION

3.01 INSTALLATION, GENERAL
A. Set work accurately, in alignment and where shown, plumb, level, free of rack and twist, and set parallel or perpendicular as required to line and plane of surface.

B. Set frames of access doors and similar items flush with finish floor and, where applicable, flush with side of opening.

C. Field weld in accordance with AWS.

1. Design and finish as specified for shop welding.

2. Use continuous weld unless specified otherwise.

D. Install anchoring devices and fasteners as shown and as necessary for securing metal fabrications to building construction as specified.

E. Spot prime all abraded and damaged areas of zinc coating as specified and all abraded and damaged areas of shop prime coat with same kind of paint used for shop priming.

3.02 INSTALLATION OF SUPPORTS
A. Anchorage to structure:

1. Secure angles or channels and clips to overhead structural steel by continuous welding unless bolting is shown.

2. Secure supports to concrete inserts by bolting as shown.

3. Secure steel plate to studs as detailed.

B. Supports for Wall Mounted items:

1. Locate center of support at anchorage point of supported item.

2. Locate support at top and bottom of wall hung cabinets.

3. Locate support at top of floor cabinets and shelving installed against walls.

4. Locate supports where required for items shown.

C. Supports for Trapeze Bars:

1. Secure plates to overhead construction with fasteners where shown.

2. Secure angle brace assembly to overhead construction with fasteners where shown and bolt plate to braces.

3. Fit modular channel unit to equipment and secure with modular channel unit manufacturer's standard fittings as shown.

Page 644 of 1236 ends

SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 11 of 11

3.03 CLEAN AND ADJUSTING
A. Adjust movable parts including hardware to operate as designed without binding or deformation of the members centered in the opening or frame and, where applicable, contact surfaces fit tight and even without forcing or warping the components.

B. Clean after installation exposed prefinished and plated items and items fabricated from stainless steel, aluminum and copper alloys, as recommended by the metal manufacture and protected from damage until completion of the project.

3.04 INSTALLATION OF STEEL PIPE BOLLARD
A. Set bollards vertically in concrete piers. Compressive strength of concrete piers shall be 21MPa 3000psi. For dimensions of concrete piers

END OF SECTION

Page 645 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 646 of 1236
SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 1 of 5
PART 1 GENERAL

1.01 SUMMARY
A. Provide labor, materials and equipment to complete all rough and finish carpentry work as indicated in the Contract Documents.

B. Work of this section include rough carpentry, framing, plywood, composite lumber, sheathing, wood nailers, blocking, sleepers, curbs, cants, wood and hollow metal door frames rough framing, finish carpentry and miscellaneous installed finished items.

1. Establish lines and levels for use of other trades.

2. Create openings and lintels for increased door heights.

C. Provide labor, materials and equipment to shore, brace either temporarily or permanently wood ceiling systems to remain that will be disturbed during demolition and preparation of new walls and ceiling systems.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCES
A. AHA A135.4 - Basic Hardboard; American Hardboard Association.

B. ANSI A208.1 - Wood Particleboard.

C. ASTM C1036 - Standard Specification for Flat Glass.

D. ASTM C1048 - Standard Specification for Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated Glass.

E. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

F. AWI P-200 - Architectural Woodwork Quality Standards; Architectural Woodwork Institute.

G. AWPA C2 - Lumber, Timbers, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes; American Wood Preservers Association.

Page 647 of 1236 ends

SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 2 of 5
H. NWWDA I.S.4 - Industry Standard for Water-Repellent Preservative Non-Pressure Treatment for Millwork; National Wood Window and Door Association.

I. NIST PS 1 - Construction and Industrial Plywood.

J. NIST PS 20 - American Softwood Lumber Standard.

K. WIC - Manual of Millwork; Woodwork Institute of California.

L. Forest Products Society (FPS): National Design Specification for Stress Grade Lumber and its Fastening.

1.04 SUBMITTALS
A. Product Data: Submit wood treatment certifications and instructions for proper use of each type of treated material.

B. Wood Product Certifications:

1. FSC Certification: Furnish certification indicating wood products are from “wellmanaged” forests.

2. Toxicity Certification: Furnish certification plywood has no added formaldehyde and has no toxic materials as defined by LEED.

1.05 QUALITY ASSURANCE
A. Lumber Grades: Provide visible grade stamp of an agency certified by FPS.

B. Lumber Standard: Comply with US Product Standard PS20 for each indicated use, including moisture content and actual sizes related to indicated nominal sizes.

C. Plywood Standard: Comply with PS1 (ANSI A199.1).

D. FSC Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC) including SmartWood Program and Forest Conservation Program.

PART 2 PRODUCTS

2.01 MATERIALS
A. Blocking: Provide dimensional lumber graded in accordance with FPS Grading Rules; Construction Grade, Douglas Fir; minimum S-Dry.

B. Plywood: Provide minimum APA C-D exterior (CDX) plywood; stress rated where spanning between supporting members; fire retardant treated; minimum 3/4" thick unless otherwise indicated. Where plywood will be exposed in finished work with painted finish provide A-C/EXT-APA plywood with Grade A face exposed and Grade C face concealed

Page 648 of 1236 ends

SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 3 of 5
for exterior use: and A-C/INT-APA plywood with Grade A face exposed and Grade C face concealed for interior use.

1. General: Provide plywood certified with no added formaldehyde (NAF) and with no toxic materials as defined by LEED.

C. Nails, Spikes and Staples: Galvanized; size and type to suit application.

D. Bolts, Nuts, Washers, Lags, Pins and Screws: Medium carbon steel; galvanized; size and type to suit application.

E. Fasteners: Provide fasteners as required for complete, secure installation of miscellaneous rough carpentry.

1. Steel: Bolts or powder activated type.

E. Hardwood Lumber: Graded in accordance with WIC Custom; of quality suitable for transparent finish. Species as directed by architect.

F. Lumber for Shimming and blocking: Softwood lumber of Douglas fir species.

G. Primer: Alkyd primer sealer type.

H. Wood Filler: Solvent base, tinted to match surface finish color.

I. Wood Treatment: Water Repellant Preservative Treatment by Dipping Method: NWWDA I.S.4, with 0.25 percent retainage.

F. Wood Nailers

1. All lumber for concealer blocking, roof curbs, roof nailers shall be preservative treated hemlock, pine, or fir and shall be new lumber of the best quality available, perfectly sound, well-seasoned, and free from sapwood, large loose or dead knots, streaks and evidence of disease ort pests. Maximum moisture content shall be 15%.

G. Building Paper

1. 15 Lb. asphalt impregnated felt paper.

H. Recessed Mount Key Box

1. Knox Box, 3200 Series, recesses, 10 key steel vault, hinged door, color TBD.

Located at main entry as directed by Owner.

2. Recessed, 50 key steel vault, dark bronze, located in basement mechanical room as directed by Owner. Heavy duty box.

I. Construction Adhesives

1. Products of Contech Division of Rexnord Chemical Corporation or equal as approved by Architect.
a. Interior work dry areas – PL200
b. Exterior work and wet areas – PL 400

Page 649 of 1236 ends

SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 4 of 5
c. Treated Wood – PL500

2.02 FABRICATION
A. Wood Preservation: Treat lumber and plywood to comply with applicable requirements of American Wood Preservers Association.

1. Decay Resistance Treatment: Pressure treat following items with water-borne preservatives for above ground use with AWPA C-2.
a. Treat wood members in connection with roofing, flashing, vapor barriers and waterproofing.
b. Treat wood members in contact with masonry, with concrete, and below grade.
c. Kiln-dry wood to a maximum moisture content of 19% after treatment with water-borne preservative.

2. Fire Retardant Treatment: Comply with AWPA standards for pressure impregnation with fire-retardant chemicals to achieve flame-spread rating of not more than 25 in accordance with ASTM E84 or UL Test 723. a. Treat interior wood and plywood complying with AWPA C20 and C27, Interior Type A, and identify with FRTW.
1) Exterior Type: Where indicated for exterior applications, provide fire treated wood passing ASTM D2898 rain test.
b. Provide UL label on each piece of fire-retardant wood and plywood. c. Kiln-dry treated items to maximum moisture content of 19%.

3. Complete fabrication of treated items prior to treatment, wherever possible; if cut after treatment, coat cut surfaces with heavy brush coat of same chemical used for treatment.

4. Inspect each piece after drying and discard damaged and defective pieces.

PART 3 EXECUTION

3.01 PLACEMENT
A. Place miscellaneous rough carpentry true to lines and levels.

B. Correlate location so attached work will comply with design requirements and be properly located.

C. Construct members of continuous pieces of longest possible lengths.

D. Fit carpentry work to other work; scribe and cope as required for accurate fit.

E. Shim with metal or slate for bearing on concrete and masonry.

Page 650 of 1236 ends

SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 5 of 5
F. Securely attach carpentry work to substrates by anchoring and fastening as required by recognized standards.

1. Provide washers under bolt heads and nuts in contact with wood.

G. Wood Blocking: Provide blocking of S4S lumber not less than 1-1/2" wide and of thickness required to provide adequate support or to properly locate attached material.

1. Provide attachment to other work; form to shapes shown.

2. Countersink bolts and nuts flush with surfaces.

3. Remove temporary blocking when no longer needed.

4. Anchor to formwork before concrete placement.

H. Plywood: Comply with recommendations of American Plywood Association (APA) for fabrication and installation of plywood work.

1. Provide attachment to other work; form to shapes shown.

2. Align fasteners for exposed view aesthetic as shown.

3. Fit carpentry work to other work.

4. Adjust, trim and level.

END OF SECTION 06 10 00

Page 651 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 652 of 1236
SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 1 of 4
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes: Provide mill fabricated architectural woodwork with accessories as required for complete finished installation.

1. Provide wood veneer-faced cabinetwork.

2. Provide solid surface counter.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Submit manufacturer’s literature for manufactured items.

C. Shop Drawings: Indicate materials and wood species, component profiles, fastening, joining details, finishes, and accessories.

1. Certification: Provide WI MoM Certified Compliance Label on shop drawings.

D. Samples: Furnish samples of each exposed material.

E. Certificates: "Manual of Millwork" (WI MoM) certification is required.

1. General: Before delivery to jobsite, provide WI MoM Certified Compliance Certificate indicating grade of millwork products to be furnished and certify WI MoM requirements for specified grades shall be met.

2. Casework: Each unit to bear WI MoM Certified Compliance Label.

3. Installation: Provide WI MoM Certified Compliance Certificate for Installation.

4. FSC Certification: Furnish certification indicating wood products are from “wellmanaged” forests.

Page 653 of 1236 ends

SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 2 of 4

5. Toxicity Certification: Furnish certification plywood has no added formaldehyde and has no toxic materials as defined by LEED.

1.04 QUALITY ASSURANCE
A. Fabricator Qualifications: Member of Woodwork Institute (formerly Woodwork Institute of California) with minimum five years successful experience fabricating architectural woodwork similar to that required for Project.

B. Standards: Perform architectural woodwork in accordance with recommendations Woodwork Institute "Manual of Millwork" (WI MoM).

C. Seismic Anchorage: Provide seismic anchorage for wall cabinets as required by CBC.

D. FSC Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC) including SmartWood Program and Forest Conservation Program.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver architectural woodwork until site conditions are adequate to receive work; protect items from weather while in transit.

1. Allow architectural woodwork shop finish to completely dry prior to delivery to site; allow materials to off-gas volatile organic compound (VOC) emissions off site.

B. Store materials indoors, in ventilated areas with constant but minimum temperature of 60 degrees F and maximum relative humidity of 25% to 55%.

C. Do not begin installation of architectural woodwork until space is fully enclosed and mechanical systems are fully operational.

1. Maintain interior installation areas at 70 degrees F and 50% to 55% relative humidity.

D. Immediately remove from site materials with visible mold and materials with mildew.

PART 2 PRODUCTS

2.01 MATERIALS
A. Wood Veneer Finished Casework:

1. Casework doors and exposed panels: Veneer finish per Architectural Finishes List, Section 09 06 00.

2. Factory Finish: Shop prime with polyurethane opaque finish;

Page 654 of 1236 ends

SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 3 of 4
a. Color and veneer species per Architectural Finishes List, Section 09 06

00. B. Countertop:

1. Solid Polymer Systems: Manufacturer's standard polymer system with color throughout thickness; provide manufacturer recommended joint adhesive; exposed surfaces finished to match top.
a. Quality: Comparable to WI MoM/Premium Grade.
b. Type: Not less than 1/2" thick sheet designed to accept bowls as indicated and as specified in Division 15 and with edge conditions as indicated on Drawings.
c. Color: Manufacturer's standard color as selected by Architect. d. Manufacturers:
1) DuPont Co./Corian.
2) Avonite, Inc./Avonite.
3) Formica Corp./Surell.

2. Core: Provide plywood with no added formaldehyde and no toxic materials.

C. Anchors, Nails and Screws: Select material, type, size and finish required by each substrate for secure anchorage; provide toothed steel or lead expansion bolt screws for drilled-in-place anchors.

2.02 FABRICATION
A. General: Fabricate architectural woodwork in accordance with specified quality standards.

B. Plastic Laminate:

1. Apply plastic laminate finish in full uninterrupted sheets consistent with manufactured sizes.

2. Make corners and joints hairline; slightly bevel arises.

3. Locate butt joints at least 2'-0" from cutouts.

4. Cap exposed edges with plastic laminate of same finish and pattern.

5. Apply laminate backing sheet to reverse side of laminate surfaces.

Page 655 of 1236 ends

SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 4 of 4

6. Provide cutouts for inserts, fixtures and fittings; verify locations from on-site dimensions.

7. Prime paint contact surfaces of cutouts.

C. Use exposed fastening devices or nails only when approved and unavoidable; arrange neatly.

D. Assemble woodwork in shop in sizes easily handled and to ensure passage through building openings.

PART 3 EXECUTION

3.01 EXAMINATION
A. Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication where possible; do not delay job progress, allow for trimming and fitting.

3.02 INSTALLATION
A. Install work consistent with specified quality grade, plumb, level, true and straight with no distortions.

1. Shim as required, using concealed shims.

B. Secure work to grounds, stripping and blocking with countersunk, concealed fasteners and blind nailing as required for a complete installation.

C. Scribe and cut for accurate fit to other finished work.

D. Route and prepare beams for installation of beam connectors and hangers.

E. Attach connectors to wall anchors and solid wood beams.

F. Attach architectural woodwork securely in place with uniform joints providing for thermal and building movements.

G. Attach countertop material to casework per manufacturer.

H. Acceptable Tolerances:

1. Variation from True Position: Maximum 1/16" at any position and maximum 1/8" in any 10'-0" length.

2. Adjoining Surfaces of Same Material: No variation permitted.

3. Offset with Abutting Materials: Maximum 1/32".

END OF SECTION

Page 656 of 1236 ends

SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 1 of 4
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes rubber waterproofing for below grade structures.

1.2 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.3 SUBMITTALS
A. Product Data: For each type of product.

B. Shop Drawings:

1. Show locations and extent of waterproofing.

2. Include details for substrate joints and cracks, sheet flashings, penetrations, inside and outside corners, tie-ins with adjoining waterproofing, and other termination conditions.

C. Sample warranty.

1.4 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by waterproofing manufacturer.

1.5 WARRANTY
A. Manufacturer's Special Warranty: Manufacturer agrees to repair or replace waterproofing that fails in materials or workmanship within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

Page 657 of 1236 ends

SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 2 of 4
PART 2 - PRODUCTS

2.1 RUBBER WATERPROOFING
A. Two-Component, Reinforced, Rubber Waterproofing system: ASTM C836/C836M; coal-tar free.

1. Basis-of-Design or Approved Equal:
a. Manufacturer: GCP Applied Technologies Inc., 2325 Lakeview Parkway, Suite 400, Alpharetta, GA 30009, USA; gcpat.com; 1-866-333-3726 b. Product: Procor Below Grade – Fluid applied waterproofing & all associated system components which include:
1) Procor 75 Spray Grade – For horizontal and vertical applications 2) Hydroduct Drainage Composites – Geocomposite Drainage Sheets a) HYDRODUCT® 660 Drainage Composite for use on horizontal applications.
b) HYDRODUCT® 220 Drainage Composite for use on vertical applications.
3) Bituthene Liquid Membrane – Detailing at pipe entries, etc. 4) Preprufe Tape – For tie-ins of Procor, Bituthene, or Preprufe waterproofing sheet membranes.
5) Preprufe 300R Plus – Pre-applied waterproofing membrane that bonds integrally to poured concrete

2. Hydrostatic-Head Resistance: 65 feet minimum; ASTM D5385/D5385M.

2.2 AUXILIARY MATERIALS
A. Primer: Manufacturer's standard primer, sealer, or surface conditioner; factory-formulated.

B. Sheet Flashing: 50-mil- (1.3-mm-) minimum, nonstaining, uncured sheet neoprene.

1. Adhesive: Manufacturer's recommended contact adhesive.

C. Membrane-Reinforcing Fabric: Manufacturer's recommended fiberglass mesh or polyester fabric.

D. Joint Reinforcing Strip: Manufacturer's recommended fiberglass mesh or polyester fabric.

E. Joint Sealant: Multicomponent polyurethane sealant, compatible with waterproofing; and as recommended by manufacturer for substrate and joint conditions.

1. Backer Rod: Closed-cell polyethylene foam.

2.3 PRE-APPLIED WATERPROOFING MEMBRANE – BELOW SLAB
A. Pre-Applied waterproofing membrane: Composite membrane comprised of a heavy duty grade HDPE film, pressure sensitive adhesive, and weather resistant protective coating to form an integral bond to poured concrete. Designed for horizontal and vertical use below slabs.

1. Thickness: 0.046 inch (1.2 mm), nominal

2. Lateral water migration resistance:

Page 658 of 1236 ends

SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 3 of 4

3. Hydrostatic-Head Resistance: 231 feet minimum; ASTM D5385.

4. Tensile strength: 4,000 psi (27.6 Mpa)

5. Required overlap: 3” minimum

2.4 PROTECTION COURSE
A. Protection Course: ASTM D6506, semirigid sheets of fiberglass- or mineral-reinforced-asphaltic core, pressure laminated between two asphalt-saturated fibrous liners and as follows:

1. Thickness: 1/4 inch (6 mm), nominal, for vertical applications; 1/4 inch (6 mm), nominal, elsewhere.

2. Adhesive: Rubber-based solvent type recommended in writing by waterproofing manufacturer.

2.5 MOLDED-SHEET DRAINAGE PANELS
A. Nonwoven-Geotextile-Faced, Molded-Sheet Drainage Panel with Polymeric Film: Composite subsurface drainage panel consisting of a studded, nonbiodegradable, molded-plastic-sheet drainage core; with a nonwoven, needle-punched geotextile facing with an apparent opening size not exceeding No. 70 (0.21-mm) sieve laminated to one side of the core and a polymeric film bonded to the other side; and with a vertical flow rate through the core of [9 to 21 gpm per ft. (112 to 261 L/min. per m)].

PART 3 - EXECUTION

3.1 PREPARATION
A. Clean, prepare, and treat substrates according to manufacturer's written instructions. Provide clean, dust-free, and dry substrates for waterproofing application.

B. Mask off adjoining surfaces not receiving waterproofing to prevent spillage and overspray affecting other construction.

C. Close off deck drains and other deck penetrations to prevent spillage and migration of waterproofing fluids.

D. Remove grease, oil, bitumen, form-release agents, paints, curing compounds, acid residues, and other penetrating contaminants or film-forming coatings from concrete.

E. Remove fins, ridges, and other projections, and fill honeycomb, aggregate pockets, holes, and other voids.

F. Prepare surfaces at terminations and penetrations through waterproofing and at expansion joints, drains, sleeves, and corners according to waterproofing manufacturer's written instructions and to recommendations in ASTM C898/C898M.

G. Apply waterproofing in two separate applications, and embed a joint reinforcing strip in the first preparation coat when recommended by waterproofing manufacturer.

Page 659 of 1236 ends

SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 4 of 4
H. Prepare, treat, rout, and fill joints and cracks in substrate according to waterproofing manufacturer's written instructions and to recommendations in ASTM C898/C898M. Before coating surfaces, remove dust and dirt from joints and cracks according to ASTM D4258.

I. Install sheet flashing and bond to deck and wall substrates where required according to waterproofing manufacturer's written instructions.

3.2 WATERPROOFING APPLICATION
A. Apply waterproofing according to manufacturer's written instructions and to recommendations in ASTM C898/C898M.

B. Unreinforced Waterproofing Applications.

1. Apply one or more coats of waterproofing to obtain a seamless membrane free of entrapped gases and pinholes, with a dry film thickness of 60 mils (1.5 mm).

C. Install protection course with butted joints over waterproofing before starting subsequent construction operations.

1. For horizontal applications, install protection course loose laid over fully cured membrane.

2. For vertical applications, set protection course in nominally cured membrane, which will act as an adhesive. If membrane cures before application of protection course, use adhesive.

3. Molded-sheet drainage panels may be used in place of a separate protection course for vertical applications when approved in writing by waterproofing manufacturer.

3.3 MOLDED-SHEET DRAINAGE PANEL INSTALLATION
A. Place and secure molded-sheet drainage panels, with geotextile facing away from wall or deck substrate, according to manufacturer's written instructions. Use adhesive or another method that does not penetrate waterproofing. Lap edges and ends of geotextile to maintain continuity.

Protect installed molded-sheet drainage panels during subsequent construction.

1. For vertical applications, install protection course before installing drainage panels.

3.4 PROTECTION
A. Do not permit foot or vehicular traffic on unprotected membrane.

B. Protect waterproofing from damage and wear during remainder of construction period.

C. Correct deficiencies in or remove waterproofing that does not comply with requirements; repair substrates, reapply waterproofing, and repair sheet flashings.

END OF SECTION

Page 660 of 1236 ends

SECTION 07 21 00 BUILDING INSULATION
BUILDING INSULATION 07 21 00 - 1 of 3
PART 1 GENERAL

1.01 SUMMARY
A. Provide labor, material, equipment and services to furnish and install building insulation as shown on the drawings, as specified herein and as required for a complete and proper installation, including, but not limited to, the following:

1. Thermal Insulation

2. Acoustic Insulation

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Furnish manufacturer's literature for each type of insulation.

1. Submit Underwriter's Laboratory approval numbers for required fire ratings; approvals of other laboratories contingent upon acceptance of applicable authorities.

C. Certificates: Stating the type, thickness and "R" value (thermal resistance) of the insulation to be installed.

1.04 STORAGE AND HANDLING
A. Store insulation materials in weathertight enclosure.

B. Protect insulation from damage from handling, weather and construction operations before, during, and after installation.

1.05 APPLICABLE STANDARDS: The latest edition of publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.

A. Federal Specifications (Fed. Spec.)
FF N 105B (3) Nails, Brads, Staples and Spikes: Wire, Cut and Wrought B. California Building Codes (CBC) 2019 Energy Codes

Page 661 of 1236 ends

SECTION 07 21 00 BUILDING INSULATION
BUILDING INSULATION 07 21 00 - 2 of 3
C. American Society for Testing and Materials (ASTM):

C552 Cellular Glass Block and Pipe Thermal Insulation
C553 Mineral Fiber Blanket and Felt Insulation (Industrial Type) C578 Preformed Cellular Polystyrene Thermal Insulation
C591 Unfaced Preformed Rigid Cellular Polyurethane Thermal Insulation C612 Mineral Fiber Block and Board Thermal Insulation
C665 Mineral Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
C728 Perlite Thermal Insulation Board
C954 Steel Drill Screws for the Application of Gypsum Board or Metal Plaster Base to Steel Studs From 0.033 inch to 0.112 inch in thickness
C1002 Steel Drill Screws for the Application of Gypsum Board PART 2 PRODUCTS

2.01 MATERIALS
A. Thermal Batt Insulation: Thermafiber SAFB, preformed slag mineral or glass fiber with thermosetting resin binders, conforming to ASTM C665, Type 1, HH-I-521F, unfaced; formaldehyde-free and with no toxic materials. Flame Spread/Smoke Density Rating:

Maximum 0/0, ASTM E84. Combustibility: Pass ASTM E136.

B. Acoustical Insulation

1. Mineral Fiber Batt or Blankets: ASTM C665, Type 1. Thickness as shown; of widths and lengths to fit tight against framing.

C. Rigid Insulation

1. On the inside face of exterior walls.

2. Cellular Glass Block, ASTM C552, Type 1.

D. Accessories: Furnish as recommended by insulation manufacturer for insulation types, substrates, and conditions involved.

E. Aerogel.

1. Flexible gel filled blanket material: ASTM C1728, Type III, Grade 1A, 10 mm (0.4 in) thick, shown; of widths and lengths to fit tight against framing. Products similar to Pryrogel HPS.

Page 662 of 1236 ends

SECTION 07 21 00 BUILDING INSULATION
BUILDING INSULATION 07 21 00 - 3 of 3
PART 3 EXECUTION

3.01 EXAMINATION
A. Verify substrate and adjacent materials are dry and ready to receive insulation; beginning installation signifies acceptance of conditions.

B. Ensure mechanical and electrical items affecting work are properly placed, complete, and have been inspected by Architect prior to commencement of installation.

3.02 INSTALLATION
A. Install batt or blanket insulation with tight joints and filling framing void completely. Seal cuts, tears, and un-lapped joints with tape.

B. Fit insulation tight against adjoining construction and penetrations, unless specified otherwise. Install insulation in accordance with manufacturer's instructions.

C. Cut and trim insulation neatly, to fit spaces.

D. Fit insulation tight within spaces and tight to and behind mechanical and electrical services within insulation plane; leave no gaps or voids; maintain integrity of thermal barrier.

E. Friction fit batt insulation in place; use tape or penetration supports as necessary to assure permanent installation.

F. Fasten blanket insulation between metal studs and wall furring with continuous pressure sensitive tape along edges or adhesive.

G. Pack insulation around door frames and windows and in cracks, expansion joints, control joints, door soffits and other voids. Pack behind outlets, around pipes, ducts, and services encased in wall or partition. Hold insulation in place with pressure sensitive tape or adhesive.

H. Do not compress insulation below required thickness except where embedded items prevent required thickness.

END OF SECTION

Page 663 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 664 of 1236
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 1 of 8
PART 1 - GENERAL

1.01 DESCRIPTION
A. Roof and deck insulation on new construction ready to receive roofing or waterproofing membrane over wood deck.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced.

Publications are referenced in the text by the basic designation only. Editions of applicable publications current on date of issue of bidding documents apply unless otherwise indicated.

B. American Society of Heating, Refrigeration and Air Conditioning (ASHRAE):

90.1-07 .......................... Energy Standard for Buildings Except Low-Rise Residential Buildings
C. ASTM International (ASTM):

C208-08 ........................ Cellulosic Fiber Insulating Board C552-07 ........................ Cellular Glass Thermal Insulation C726-05 ........................ Mineral Fiber Roof Insulation Board C728-05 ........................ Perlite Thermal Insulation Board C1177/C1177M-08 ........ Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
C1278/C1278M-07 ........ Standard Specification for Fiber-Reinforced Gypsum Panel C1289-10 ...................... Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board C1396/C1396M-09 ........ Standard Specification for Gypsum Board D41-05 .......................... Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
D312-06 ........................ Asphalt Used in Roofing

Page 665 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 2 of 8
D1970-09 ...................... Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing
Underlayment for Ice Dam Protection
D2178-04 ...................... Asphalt Glass Felt Used in Roofing and Waterproofing D2822-05 ...................... Asphalt Roof Cement
D4586-07 ...................... Standard Specification for Asphalt Roof Cement, Asbestos-Free E84-09 ........................... Standard Test Method for Surface Burning Characteristics of Building Material
F1667-05 ....................... Driven Fasteners: Nails, Spikes, and Staples D. FM Approvals: RoofNav Approved Roofing Assemblies and Products. 4450-89 ......................... Approved Standard for Class 1 Insulated Steel Deck Roofs 4470-10 ......................... Approved Standard for Class 1 Roof Coverings 1-28-09 .......................... Loss Prevention Data Sheet: Design Wind Loads. 1-29-09 .......................... Loss Prevention Data Sheet: Above-Deck Roof Components 1-49-09 .......................... Loss Prevention Data Sheet: Perimeter Flashing E. National Roofing Contractors Association: Roofing and Waterproofing Manual F. U.S. Department of Agriculture (USDA): USDA BioPreferred Catalog, www.biopreferred.gov
G. Underwriters Laboratories, Inc. (UL): Fire Resistance Directory (2009) H. U.S. Department of Commerce National Institute of Standards and Technology (NIST):

DOC PS 1-09 ................ U.S. Product Standard for Construction and Industrial Plywood DOC PS 2-04 ................ Performance Standard for Wood-Based Structural-Use Panels.

1.04 PERFORMANCE REQUIREMENTS
A. Thermal Performance: Provide roof insulation meeting minimum overall average R-value of 33 (6 inches).

B. FM Approvals: Provide roof insulation complying with requirements in FM Approvals 4450 and 4470 as part of specified roofing system, listed in FM Approvals "RoofNav" as part of roofing system meeting Fire/Windstorm Classification in Division 07 roofing section.

1.05 QUALITY CONTROL
A. Requirements of Division 07 roofing section for qualifications of roofing system insulation Installer; Work of this Section shall be performed by same Installer.

B. Requirements of Division 07 roofing section for inspection of Work of this Section and qualifications of Inspector.

Page 666 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 3 of 8
C. Unless specified otherwise, comply with the recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to insulation for storage, handling, and application.

D. Requirements of roofing system uplift pressure design for specified roofing system.

E. Requirements of applicable FM Approval for specified roofing system insulation attachment.

G. Bio-Based Materials: Where applicable, provide products designated by USDA and meeting or exceeding USDA recommendations for bio-based content, and products meeting Rapidly Renewable Materials and certified sustainable wood content definitions; refer to www.biopreferred.gov.

1.06 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Product Data:

1. Asphalt and adhesive materials, each type.

2. Roofing cement, each type.

3. Roof insulation, each type.

4. Fastening requirements.

C. Federal Sustainable Design Submittals:

1. Product Data for Federally-Mandated Bio-Based Materials: For roof materials, indicating USDA designation and compliance with definitions for bio-based products, Rapidly Renewable Materials, and certified sustainable wood content.

D. Shop Drawings: Include plans, sections, details, and attachments.

1. Nailers, cants, and terminations.

2. Layout of insulation showing slopes, tapers, penetration, and edge conditions.

E. Samples:

1. Roof insulation, each type.

2. Nails and fasteners, each type.

F. Certificates:

1. Indicating type, thermal conductance, and minimum and average thickness of insulation.

2. Indicating materials and method of application of insulation system meet the requirements of FM Approvals for specified roofing system.

G. Laboratory Test Reports: Thermal values of insulation products.

Page 667 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 4 of 8
H. Layout of tapered roof system showing units required.

I. Documentation of supervisors' and inspectors' qualifications.

1.07 DELIVERY, STORAGE AND MARKING
A. Comply with the recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to built-up roofing for storage, handling and installation requirements.

1.08 QUALITY ASSURANCE:

A. Roof insulation on combustible or steel decks shall have a flame spread rating not greater than 75 and a smoke developed rating not greater than 150, exclusive of covering, when tested in accordance with ASTM E84, or shall have successfully passed FM Approvals 4450.

1. Insulation bearing the UL label and listed in the UL Building Materials Directory as meeting the flame spread and smoke developed ratings will be accepted inlieu-of copies of test reports.

2. Compliance with flame spread and smoke developed ratings will not be required when insulation has been tested as part of a roof construction assembly of the particular type used for this project and the construction is listed as fire-classified in the UL Building Materials Directory or listed as Class I roof deck construction in the FM Approvals "RoofNav."

3. Insulation tested as part of a roof construction assembly shall bear UL or FM labels attesting to the ratings specified herein.

PART 2 - PRODUCTS

2.01 ADHESIVE MATERIALS
A. Adhesive Materials, General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

1. Liquid-type adhesive materials shall comply with VOC limits of authorities having jurisdiction.

2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. Plastic Foam Adhesives: 50 g/L.
b. Multipurpose Construction Adhesives: 70 g/L.
c. Fiberglass Adhesives: 80 g/L.
d. Contact Adhesives: 80 g/L.

Page 668 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 5 of 8
e. Other Adhesives: 250 g/L.
f. Non-membrane Roof Sealants: 300 g/L.
g. Sealant Primers for Non-porous Substrates: 250 g/L.
h. Sealant Primers for Porous Substrates: 775 g/L.

B. Primer: ASTM D41.

C. Asphalt: ASTM D312, Type III or IV for vapor retarders and insulation.

D. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.

E. Bead-Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.

F. Full-Spread Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended spray-applied, low-rise, two-component urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.

G. Roof Cement: Asbestos free, ASTM D2822, Type I or Type II, ; or, D4586, Type I or Type II.

2.02 ROOF AND DECK INSULATION
A. Roof and Deck Insulation, General: Preformed roof insulation boards approved by roofing manufacturer and listed as component of FM Approvals-approved roofing system.

B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 1, Grade 2, felt or glassfiber mat facer on both major surfaces.

C. Cellular Glass Board Insulation: ASTM C552, Type IV, kraft-paper sheet faced.

D. Perlite Board Insulation: ASTM C728, expanded perlite, cellulosic fibers, binders, and waterproofing agents with top surface seal coated.

E. Cellulosic Fiber Board Insulation: ASTM C208, Type II, Grade 1 for built-up asphalt or modified bitumen roofing.

F. Tapered Roof Insulation System:

1. Fabricate of mineral fiberboard, polyisocyanurate, perlite board, or cellular glass.

Use only one insulation material for tapered sections. Use only factory-tapered insulation.

2. Cut to provide high and low points with crickets and slopes as shown.

3. Minimum thickness of tapered sections; 38 mm (1-1/2 inch).

Page 669 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 6 of 8

4. Minimum slope 1:48 (1/4 inch per 12 inches).

2.03 INSULATION ACCESSORIES
A. Glass (Felt): ASTM D2178, Type VI, heavy duty ply sheet.

B. Cants and Tapered Edge Strips:

1. Wood Cant Strips: Refer to Division 06 Section "Rough Carpentry."

2. Insulation Cant Strips: ASTM C208, Type II, Grade 1, cellulosic-fiber insulation board.

3. Tapered Edge Strips: 1:12 (one inch per foot), from 0 mm (0 inches), 300 mm to 450 mm (12 inches to 18 inches) wide.
a. Cellulosic Fiberboard: ASTM C208.
b. Mineral Fiberboard: ASTM C726.
c. Perlite Board: ASTM C728.

C. Vapor Retarder:

1. Glass-Fiber Felts: ASTM D2178, Type IV, asphalt impregnated.

2. Self-Adhering Sheet Vapor Retarder: ASTM D1970, minimum of 1.0-mm- (40- mil-) thick, polyethylene film laminated to layer of rubberized asphalt adhesive, or

0.76- to 1.0-mm- (30- to 40-mil-) thick, polyethylene film laminated to layer of butyl rubber adhesive; maximum permeance rating of 6 ng/Pa x s x sq. m (0.1 perm).

2.04 FASTENERS
A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with FM Approvals 4470, designed for fastening substrate board to roof deck.

B. Staples and Nails: ASTM F1667. Type as designated for item anchored and for substrate.

PART 3 - EXECUTION

3.01 EXAMINATION
A. Comply with requirements of Division 07 roofing section.

3.02 PREPARATION
A. Comply with requirements of Division 07 roofing section.

Page 670 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 7 of 8

3.03 RIGID INSULATION INSTALLATION
A. Insulation Installation, General:

1. Install roof insulation in accordance with roofing system manufacturer's written instructions.

2. Install roof insulation in accordance with requirements of FM Approval's Listing for specified roofing system.

3. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate prior to installation of insulation.

4. Cant Strips: Install preformed insulation cant strips at junctures of roofing system with vertical construction.

B. Insulation Thickness:

1. Thickness of roof insulation shown on drawings is nominal. Actual thickness shall provide the average thermal resistance "R" value of not less than that specified in Performance Requirements Article.

2. When thickness of insulation to be used is more or less than that shown on the drawings, make adjustments in the alignment and location of roof drains, flashing, gravel stops, fascias and similar items at no additional cost to the Government.

3. Where tapered insulation is used, the insulation thickness at high points and roof edges shall be as shown on the drawings; the thickness at the low point (drains) shall be not less than 38 mm (1-1/2 inches).

5. Use not less than two layers of insulation when insulation is 68 mm (2.7 inch) or more in thickness unless specified otherwise. Stagger joints minimum 150 mm (6 inches).

C. Lay insulating units with close joints, in regular courses and with cross joints broken.

When laid in more than one layer, break joints of succeeding layers of roof insulation with those in preceding layer.

D. Lay units with long dimension perpendicular to the rolled (longitudinal) direction of the roofing felt.

E. Seal all cut edges at penetrations and at edges against blocking with bitumen or roof cement.

F. Cut to fit tight against blocking or penetrations.

G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.

H. Installation Method:

1. Adhered Insulation:

Page 671 of 1236 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 8 of 8
a. Prime substrate as required.
b. Set each layer of insulation firmly in solid mopping of hot asphalt. c. Set each layer of insulation firmly in ribbons of bead-applied insulation adhesive.
d. Set each layer of insulation firmly in uniform application of full-spread insulation adhesive.

2. Mechanically Fastened Insulation:
a. Fasten insulation in accordance with FM Approval's "RoofNav" requirement in Division 07 roofing section.
b. Fasten insulation to resist uplift pressures specified in Division 07 roofing section.

3. Mechanically Fastened and Adhered Insulation:
a. Fasten first layer of insulation according to "Mechanically Fastened Insulation" requirements.
b. Fasten each subsequent layer of insulation according to "Adhered Insulation" requirements.

END OF SECTION

Page 672 of 1236 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 1 of 6
PART 1 GENERAL

1.01 SUMMARY
A. Manufacturer’s requirements for the proper design, use, and installation of an Exterior Insulation and Finish System.

1. The scope of this work includes creating EIFS infill panels at exterior precast panel openings with a heavy aggregate finish.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCES
A. ASTM B117 Test Method for Salt Spray (Fog) Testing
B. ASTM C1135 Test Method for Determining Tensile Adhesion Properties of Structural Sealants
C. ASTM D968 Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
D. ASTM D1037 Standard Test Methods for Evaluating Properties of Wood-Base Fiber and Particle Panel Materials
E. ASTM D2247 Practice for Testing Water Resistance of Coatings in 100 Percent Relative Humidity
F. ASTM D2294 Standard Test Method for Creep Properties of Adhesives in Shear by Tension Loading (Metal-to-Metal).

G. ASTM D2794 Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
H. ASTM D3273 Standard Test Method for Resistance to Growth of Mold on the Surface of I. ASTM E84 Test Method for Surface Burning Characteristics of Building Materials J. ASTM E108 Standard Test Methods for Fire Tests of Roof Coverings K. ASTM E119 Standard Test Method for Fire Tests of Building Construction and Materials.

L. ASTM E330 Test method for Structural Performance by Uniform Static Air Pressure Difference
M. ASTM E331 Test Method for Water Penetration by Uniform Static Air Pressure Difference

Page 673 of 1236 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 2 of 6
N. ASTM E695 Method for Measuring Relative Resistance to Impact Loading O. ASTM E2134 Standard Test Method for Evaluating the Tensile-Adhesion Performance of an Exterior Insulation and Finish System (EIFS)
P. ASTM E2430 Standard Specification For Expanded Polystyrene (“EPS”) Thermal Insulation Boards For Use In Exterior Insulation and Finish Systems (“EIFS”)
Q. ASTM E2485 Standard Test Method for Freeze/Thaw Resistance of Exterior Insulation and Finish Systems (EIFS) and Water Resistive Barrier Coatings R. ASTM E2486 Standard Test Method for Impact Resistance of Class PB and PI Exterior Insulation and Finish Systems (EIFS)
S. ASTM G155/ Accelerated Weathering for Exposure of Nonmetallic Materials G153
T. Fed. Spec. Coating,Textured (For Interior and Exterior Masonry Surfaces) TT-C-555B
U. MIL STD 810B Military Standard, Environmental Test Methods V. NFPA 259 Test Method for Potential Heat of Building Materials W. NFPA 268 Standard Test Method for Determining Ignitability of Exterior Wall Assemblies Using a Radiant Heat Energy Source
X. NFPA 285 Standard Method of Test for the Evaluation of Flammability characteristics of Exterior Nonload-bearing Wall Assemblies Containing Combustible Components Using the Intermediate-scale, Multistory Test Apparatus

1.04 SUBMITTALS
A. Submit Samples, Evaluation Reports, warranties and Certificates.

1.05 QUALITY ASSURANCE
A. Qualifications

1. All EIFS assembly materials must be manufactured or sold by a single-source manufacturer.

2. Applicator:
a. Must process a current manufacture’s certificate of education b. Must be experienced and competent in installation of plaster-like materials

1.06 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials in original packaging with manufacturer’s identification B. Storage: Store materials in a cool, dry location, out of sunlight, protected from weather and other harmful environment, and at a temperature above 40°F (4°C) and below 110°F (43°C) in accordance with manufacturer's instructions.

Page 674 of 1236 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 3 of 6

1.07 SITE CONDITIONS
A. Installation Ambient Air Temperature: Minimum of 40°F (4°C) and rising, and remain so for 24 hours thereafter.

B. Substrate Temperature: Do not apply materials to substrates whose temperature are below 40°F (4°C) or contain frost or ice.

C. Inclement Weather: Do not apply materials during inclement weather unless appropriate protection is employed.

D. Sunlight Exposure: Avoid, when possible, installation of the materials in direct sunlight.

Application of Acrylic Finishes in direct sunlight in hot weather may adversely affect aesthetics.

E. Materials shall not be applied if ambient temperature exceeds 120°F (49°C) or falls below 40°F (4°C) within 24 hours of application. Protect materials from uneven and excessive evaporation during hot, dry weather.

F. Prior to installation, the substrate shall be inspected for surface contamination, or other defects that may adversely affect the performance of the materials and shall be free of residual moisture.

1.08 WARRANTY
A. Warranty: Manufacturer’s 5 Year Warranty.

PART 2 PRODUCTS

2.01 MATERIALS
A. Manufacturer, Basis of Design: Parex USA, Inc.

2.02 MATERIALS
A. Adhesives:

1. Parex 302 ABC-N1 Base Coat & Adhesive: 100% acrylic polymer base, ready to use, applied without the addition of cement.

B. Insulation Board: In compliance with manufacturer’s requirments for Standard System EIFS.

1. Produced and labeled under a third party quality program as required by applicable building code; and produced by a manufacturer approved by Parex USA.

2. Shall conform to ASTM C578 and ASTM E2430, Type I and the Parex USA specification for Molded Expanded Polystyrene Insulation board.

3. Maximum size shall be 2 ft x 4 ft (610 mm x 1219 mm).

4. Thickness: 3/4 in, minimum (19 mm) after rasping.

C. Base Coats:

1. 302 ABC-N1 Base Coat & Adhesive: 100% acrylic polymer base, ready to use, applied without the addition of cement.

Page 675 of 1236 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 4 of 6
D. Reinforcing Mesh:

1. 358.10 Intermediate Impact 10 Mesh: Wight 12 oz per sq. yd. (407 g/sq m) Reinforcing mesh used with a Standard Sustem, to achieve ASTM E2486 intermediate impact strength.

2. 356 Short Detail Mesh: Reinforcing mesh used for backwrapping and details.

E. Primer:

1. Parex USA Primer: 100% acrylic based coating to prepare surfaces for acrylic or elastomeric finishes.

2. Variance VariPrime Sanded: 100% acrylic based coating to prepare surface for exposed aggregate specialty finishes
F. Finish:

1. Parex USA Variance. Acrylic-based specialty finish. Finish type, texture, and color per Section 09 06 00 Schedules for Finishes.

2. Parex USA Clear Sealer: 100% acrylic, transparent, permeable, dirt resistant sealter for use as a protective coating over acrylic finishes. Use 600 Clear or Matte Clear.
a. Variance Antiquing Gel: a water-based, tinted, semi-transparent, acrylic emulsion for staining, sealing, and protecting concrete, masonry and other cementitious substrates. Use as required to achieve desired finish.

3. Parex USA Clear Sealer: 100% acrylic, transparent, permeable, dirt resistant sealer for use as a protective coating over acrylic finishes. Use 600 Clear or 610 Matte Clear.

G. Portland Cement: ASTM C150, Type I or Type I-II.

H. Water: Clean, cool, potable water.

2.03 RELATED MATERIALS AND ACCESSORIES
A. Substrate Material: Concrete
B. Sealant System:

1. Sealant for expansion joints between panelized EIFS sections shall be ultra-low modulus designed for minimum 100% elongation and minimum 50% compression and as selected by Project Designer.

2. Sealant for perimeter seals around window and door frames and other wall penetrations shall be low modulus, designed for minimum 50% elongation and minimum 25% compression, and as selected by Project Designer.

3. Sealants shall conform to ASTM C 920, Grade NS.

4. Expansion joints between sections of EIFS shall have a minimum width of 3/4 in (19 mm).

5. Perimeter seal joints shall be a minimum width of 1/2 in (12.7 mm).

Page 676 of 1236 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 5 of 6

6. Sealant backer rod shall be closed-cell polyethylene foam.

7. Apply sealant to tracks or base coat of EIFS.

8. Refer to EIFS manufacturer’s current bulletin for listing of sealants which have been tested and have been found to be compatible with EIFS materials.

9. Joint design, surface preparation, and sealant primer shall be based on sealant manufacturer's recommendations and project conditions.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify project site conditions.

B. Compliance: Comply with manufacturer’s instructions for installation.

C. Substrate Examination: Examine prior to installation of EIFS assembly materials as follows:

1. Substrate shall be examined for soundness, and other harmful conditions.

2. Substrate shall be free of dust, dirt, laitance, efflorescence, and other harmful contaminants.

D. Sealants and Backer Rod: To be installed, where required, in accordance with the sealant manufacturer's specifications and published literature, and using the sealant manufacturers recommended primers.

E. Advise Contractor of discrepancies preventing proper installation of the EIFS materials.

Do not proceed with the work until unsatisfactory conditions are corrected.

3.02 PREPARATION
A. Protection: Protect surrounding material surfaces and areas during installation of system.

B. Clean surfaces thoroughly prior to installation.

C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.03 MIXING
A. Mix materials in accordance with manufacturer’s instructions.

3.04 APPLICATION
A. General: Installation shall conform to this specification and manufacturer’s written instructions.

B. Insulation Board:

1. Install back-wrap mesh or edge-wrap mesh at system terminations.

2. Apply EIFS adhesive to backs of insulation boards with a notched trowel, with ribbons of adhesive oriented in a vertical direction (parallel to the 2 ft (61 mm) dimension of the EPS board).

Page 677 of 1236 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 6 of 6

3. Install insulation board without gaps in a running bond pattern and interlocked at corners.

4. Rasp irregularities off insulation board after adhesive has dried a minimum of 24 hours.

C. Apply base coat and fully embed mesh in base coat; include diagonal mesh patches at corners of openings and reinforcing mesh patches at joints of track sections. Apply multiple layers of base coat and mesh where required for specified impact resistance classification.

D. Apply primer to base coat after drying. Primer may be omitted if it is not required by the manufacturer's product data sheets for the specified finish coat or otherwise specified for the project.

E. Finish Coat: Apply finish coat to match specified finish type, texture, and color. Do not apply finish coat to surfaces to receive sealant. Keep finish out of sealant joint gaps.

3.05 CLEAN-UP
A. Removal: Remove and legally dispose of EIFS materials from job site.

B. Clean surfaces and work area of foreign materials resulting from material installation.

3.06 PROTECTION
A. Provide protection of installed materials from water infiltration into or behind them.

B. Provide protection of installed materials from dust, dirt, precipitation, and freezing during installation, and continuous high humidity until fully cured and dry.

C. Clean exposed surfaces using materials and methods recommended by the manufacturer of the material or product being cleaned. Remove and replace work that cannot be cleaned to the satisfaction of the Project Designer/Owner.

END OF SECTION 07 24 00

Page 678 of 1236 ends

SECTION 07 26 16 UNDERSLAB VAPOR RETARDER
UNDERSLAB VAPOR RETARDER 07 26 16 - 1 of 2
PART 1 GENERAL

1.01 SUMMARY
A. Vapor retarder under concrete slabs on grade.

1.02 RELATED SECTIONS
A. All Sections listed in the Table of Contents are a Condition of this Section.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Submit for vapor retarder sheet and installation accessories. Include data from tests performed within 18 months of submittal showing compliance with specified standard.

C. Shop Drawings: Show extent of vapor retarder work. Include details for edges at walls, grade beams, and the like. Include details for penetrating elements including conduit, piping, and structural membranes.

PART 2 PRODUCTS

2.01 VAPOR RETARDER
A. Plastic Sheet Vapor Retarder: Meeting ASTM E 1745, Class A. Minimum 15 mil thick polyolefin sheet.

Acceptable types include:

1. Stego Wrap by Stego Industries

2. Moistop Ultra A by Fortifiber Corp

3. VaporBlock 15 by Raven Industries

4. Perminator by W.R. Meadows
B. Accessory Products

1. Provide manufacturer’s recommended self-adhesive plastic seam tape for seams and penetrations.

2. Penetration boots: Provide manufacturer’s recommended accessory system for sealing pipe and conduit penetrations.

Page 679 of 1236 ends

SECTION 07 26 16 UNDERSLAB VAPOR RETARDER
UNDERSLAB VAPOR RETARDER 07 26 16 - 2 of 2
PART 3 EXECUTION

3.01 EXAMINATION
A. Verify that surface to receive vapor retarder is compacted and trimmed smooth.

B. Verify that all work that will penetrate vapor retarder is complete and rigidly installed.

C. Confirm locations and details of vapor retarder termination.

3.02 VAPOR RETARDER INSTALLATION
A. General: Comply with requirements of ASTM E 1643 and manufacturer’s published instructions.

B. Place plastic sheet vapor retarder directly on compacted granular fill. Place sheeting with longest dimension parallel with direction of pour.

C. Lap joints 6 inches and seal with per manufacturer’s recommendations with pressure sensitive tape.

D. Tape seal vapor retarder at all perimeters.

E. Tape seal vapor retarder around columns, pipe, and conduit penetrations.

F. Avoid cutting or puncturing vapor retarder/barrier during reinforcement placement and concreting operations. Repair damages before placing concrete.

END OF SECTION

Page 680 of 1236 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 1 of 7
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes: Provide materials and accessories as required for complete installation.

1. Surface preparation.

2. Application of liquid applied vapor permeable air barrier. May be referred to weather resistive barrier on Drawings.

3. Application of materials to provide bridge and seal air leakage pathways in a. Wall and roof connections and penetrations.
b. Walls, windows, louvers or doors
c. All other penetrations through the wall assembly.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCES
A. ASTM D412-98a(2002)e1 - Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers-Tension.

B. ASTM E96-00e1 (Method B) - Standard Test Methods for Water Vapor Transmission of Materials.

C. ASTM E283-91 (1999) - Standard Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.

D. ASTM E783 - Standard Test Method for Field Measurement of Air Leakage through Installed Exterior Windows and Doors.

E. ASTM E1105 - Standard Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform or Cyclic Static Air Pressure Difference.

F. ASTM E2178-01 - Standard Test Method for Air Permeance of Building Materials.

Page 681 of 1236 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 2 of 7
G. ASTM E2357 - 05 Standard Test Method for Determining Air Leakage of Air Barrier Assemblies.

1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Furnish manufacturer's literature for each type of insulation.

1. Product Data: Include manufacturer's written instructions for evaluating, preparing, and treating substrate; technical data; and tested physical and performance properties of air barrier.

2. Shop Drawings: Show locations and extent of air barrier. Include details for substrate joints and cracks, counterflashing strip, penetrations, inside and outside corners, terminations, and tie-ins with adjoining construction. Include details of interfaces with other materials that form part of air barrier.

3. Use an experienced installer and adequate number of skilled personnel who are thoroughly trained and experienced in the application of the air barrier.

4. Obtain air/vapor barrier materials from a single manufacturer regularly engaged in manufacturing the product.

5. Provide products which comply with all state and local regulations controlling use of volatile organic compounds (VOCs).

1.05 MOCK-UP
A. Before beginning installation of air barrier, build mockups of exterior wall assembly, full height by ten (10) feet wide, including parapet, backup wall construction, external cladding, window, door frame and sill, insulation, and flashing to demonstrate surface preparation, crack and joint treatment, and sealing of gaps, terminations, and penetrations of air barrier membrane.

1. Coordinate construction of mockup to permit inspection of air barrier before external insulation and cladding is installed.

2. Reconstruct mockups do not comply with requirements.

3. Approved mockups may become part of the completed.

4. Include installers of other construction connecting to air barrier, including roofing, waterproofing, composite metal wall panels, metal wall panels, sealants, windows, glazed curtain walls, and door frames.

5. Review air barrier requirements including surface preparation, substrate condition and pretreatment, minimum substrate curing period, forecasted weather conditions, special details and sheet flashings, mockups, installation

Page 682 of 1236 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 3 of 7
procedures, sequence of installation, testing and inspecting procedures, and protection and repairs.

1.06 DELIVERY, STORAGE AND HANDLING
A. Store liquid materials in their original undamaged packages in a clean, dry, protected location and within temperature range required by air barrier manufacturer.

B. Store at temperatures at or above 40oF (4oC), free from contact with cold or frozen surfaces.

C. Remove and replace liquid materials that cannot be applied within their stated shelf life.

D. Protect stored materials from direct sunlight.

E. Protect materials during handling and application to prevent damage or contamination.

1.07 ENVIRONMENTAL REQUIREMENTS
A. Product not intended for uses subject to abuse or permanent exposure to the elements.

B. Do not proceed with product application if rainfall is forecast or imminent within 12 hours.

C. Do not apply membrane when air or surface temperatures are below 40oF (4oC).

D. Do not apply when air, material and surface temperatures are expected to fall below 32º F (0º C) within 24 hours of completed application.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Carlisle
B. Grace
C. Henry
D. Rubber Polymer Corporation
E. Tremco
F. W.R. Meadows

2.02 FLUID-APPLIED MEMBRANE AIR BARRIER
A. Fluid-Applied, Vapor Impermeable Membrane Air Barrier: Two-component, self-curing synthetic-rubber-based membrane, free of solvents, isocyanates and bitumen, suitable for spray application to wet film and dry film thickness of 60 mils.

Page 683 of 1236 ends