SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 5
E. Service Load: 250 kVA.

F. Power Factor: .8 lagging.

G. Frequency: 60 Hz.

H. Voltage: 208V ac.

I. Phase: Three-phase, 4 wire,
J. Induction Method: Turbocharged.

K. Governor: Adjustable isochronous, with speed sensing.

L. Mounting Frame: Structural steel framework to maintain alignment of mounted components without depending on concrete foundation. Provide lifting attachments sized and spaced to prevent deflection of base during lifting and moving.

1. Rigging Diagram: Inscribed on metal plate permanently attached to mounting frame to indicate location and lifting capacity of each lifting attachment and engine generator center of gravity.

M. Capacities and Characteristics:

1. Power Output Ratings: Nominal ratings as indicated at 0.8 power factor excluding power required for the continued and repeated operation of the unit and auxiliaries[, with capacity as required to operate as a unit as evidenced by records of prototype testing].

2. Nameplates: For each major system component to identify manufacturer's name and address, and model and serial number of component.

N. Engine Generator Performance:

1. Steady-State Voltage Operational Bandwidth: 3 percent of rated output voltage from no load to full load.

2. Transient Voltage Performance: Not more than 20 percent variation for 50 percent stepload increase or decrease. Voltage shall recover and remain within the steady-state operating band within three seconds.

3. Steady-State Frequency Operational Bandwidth: 0.5 percent of rated frequency from no load to full load.

4. Steady-State Frequency Stability: When system is operating at any constant load within the rated load, there shall be no random speed variations outside the steady-state operational band and no hunting or surging of speed.

5. Transient Frequency Performance: Less than 5 percent variation for 50 percent step-load increase or decrease. Frequency shall recover and remain within the steady-state operating band within five seconds.

6. Output Waveform: At no load, harmonic content measured line to line or line to neutral shall not exceed 5 percent total and 3 percent for single harmonics. Telephone influence factor, determined in accordance with NEMA MG 1, shall not exceed 50 percent.

7. Sustained Short-Circuit Current: For a three-phase, bolted short circuit at system output terminals, system shall supply a minimum of 300 percent of rated full-load current for not less than 10 seconds and then clear the fault automatically, without damage to generator system components.

8. Start Time:
a. Comply with NFPA 110, Type 10 system requirements.

Page 1115 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 6
b. 10 seconds.

2.4 DIESEL ENGINE
A. Fuel: ASTM D975, diesel fuel oil, Grade 2-D S15.

B. Rated Engine Speed: 1800 rpm.

C. Lubrication System: Engine or skid-mounted.

1. Filter and Strainer: Rated to remove 90 percent of particles 5 micrometers and smaller while passing full flow.

2. Thermostatic Control Valve: Control flow in system to maintain optimum oil temperature.

Unit shall be capable of full flow and is designed to be fail-safe.

3. Crankcase Drain: Arranged for complete gravity drainage to an easily removable container with no disassembly and without use of pumps, siphons, special tools, or appliances.

D. Jacket Coolant Heater: Electric-immersion type, factory installed in coolant jacket system. Comply with UL 499 and with NFPA 110 requirements for Level 1 equipment for heater capacity.

E. Integral Cooling System: Closed loop, liquid cooled, with radiator factory mounted on engine generator set mounting frame and integral engine-driven coolant pump.

1. Coolant: Solution of 50 percent ethylene-glycol-based antifreeze and 50 percent water, with anticorrosion additives as recommended by engine manufacturer.

2. Size of Radiator: Adequate to contain expansion of total system coolant from cold start to 110 percent load condition.

3. Expansion Tank: Constructed of welded steel plate and rated to withstand maximum closed-loop coolant system pressure for engine used. Equip with gauge glass and petcock.

4. Temperature Control: Self-contained, thermostatic-control valve modulates coolant flow automatically to maintain optimum constant coolant temperature as recommended by engine manufacturer.

5. Maximum Ambient Operating Temperature: 122 deg F.

6. Coolant Hose: Flexible assembly with inside surface of nonporous rubber and outer covering of aging-, UV-, and abrasion-resistant fabric. a. Rating: 50-psig maximum working pressure with coolant at 180 deg F, and noncollapsible under vacuum. b. End Fittings: Flanges or steel pipe nipples with clamps to suit piping and equipment connections.

F. Muffler/Silencer:

1. Critical type, sized as recommended by engine manufacturer and selected with exhaust piping system to not exceed engine manufacturer's engine backpressure requirements. a. Sound level measured at a distance of 23 ft. from exhaust discharge after installation is complete shall be 76 dBA or less.

G. Air-Intake Filter: Heavy-duty, engine-mounted air cleaner with replaceable dry-filter element and "blocked filter" indicator.

H. Starting System: 24V electric, with negative ground.

Page 1116 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 7

1. Components: Sized so they are not damaged during a full engine-cranking cycle with ambient temperature at maximum specified in "Performance Requirements" Article.

2. Cranking Motor: Heavy-duty unit that automatically engages and releases from engine flywheel without binding.

3. Cranking Cycle: As required by NFPA 110 for system level specified.

4. Battery: Lead acid, with capacity within ambient temperature range specified in "Performance Requirements" Article to provide specified cranking cycle at least three times without recharging.

5. Battery Cable: Size as recommended by engine manufacturer for cable length indicated.

Include required interconnecting conductors and connection accessories.

6. Battery-Charging Alternator: Factory mounted on engine with solid-state voltage regulation and 35-A minimum continuous rating.

7. Battery Charger: Current-limiting, automatic-equalizing, and float-charging type designed for lead-acid batteries. Unit shall comply with UL 1236 and include the following features:
a. Operation: Equalizing-charging rate of 10 A shall be initiated automatically after battery has lost charge until an adjustable equalizing voltage is achieved at battery terminals. Unit shall then be automatically switched to a lower float-charging mode and shall continue to operate in that mode until battery is discharged again. b. Automatic Temperature Compensation: Adjust float and equalize voltages for variations in ambient temperature from minus 40 to 140 deg to prevent overcharging at high temperatures and undercharging at low temperatures. c. Automatic Voltage Regulation: Maintain constant output voltage regardless of input voltage variations up to plus or minus 10 percent.
d. Ammeter and Voltmeter: Flush mounted in door. Meters shall indicate charging rates.
e. Safety Functions: Sense abnormally low battery voltage and close contacts providing low battery voltage indication on control and monitoring panel. Sense high battery voltage and loss of ac input or dc output of battery charger. Either condition shall close contacts that provide a battery-charger malfunction indication at system control and monitoring panel.
f. Enclosure and Mounting: NEMA 250, Type 1, wall-mounted cabinet.

2.5 DIESEL FUEL-OIL SYSTEM
A. Comply with NFPA 37.

B. Piping: Fuel-oil piping shall be Schedule 40 black steel, complying with requirements in Section 231113 "Facility Fuel-Oil Piping." Cast iron, aluminum, copper, and galvanized steel shall not be used in the fuel-oil system.

C. Main Fuel Pump: Mounted on engine to provide primary fuel flow under starting and load conditions.

D. Fuel Filtering: Remove water and contaminants larger than 1 micron.

E. Relief-Bypass Valve: Automatically regulates pressure in fuel line and returns excess fuel to source.

F. Fuel-Oil Storage Tank: Comply with requirements in Consult tank manufacturers about capacities available for size of set in Project. See discussion of fuel tanks in the Evaluations.

G. Subbase-Mounted, Double-Wall, Fuel-Oil Tank: Factory installed and piped, complying with UL 142 fuel-oil tank. Features include the following:

Page 1117 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 8

1. Tank level indicator.

2. Fuel-Tank Capacity: 24hrs at 100% load

3. Leak detection in interstitial space.

4. Vandal-resistant fill cap.

5. Containment Provisions: Comply with requirements of authorities having jurisdiction.

2.6 CONTROL AND MONITORING
A. Automatic Starting System Sequence of Operation: When mode-selector switch on the control and monitoring panel is in the automatic position, remote-control contacts in one or more separate automatic transfer switches initiate starting and stopping of engine generator. When modeselector switch is switched to the on position, engine generator starts. The off position of same switch initiates engine generator shutdown. When engine generator is running, specified system or equipment failures or derangements automatically shut down engine generator and initiate alarms.

B. Manual Starting System Sequence of Operation: Switching on-off switch on the generator control panel to the on position starts engine generator. The off position of same switch initiates engine generator shutdown. When engine generator is running, specified system or equipment failures or derangements automatically shut down engine generator and initiate alarms.

C. Provide minimum run time control set for 15 minutes with override only by operation of a remote emergency-stop switch.

D. Control panel must comply with UL 6200.

E. Connectivity: Native Ethernet, WiFi, and Bluetooth connectivity.

F. Web Browser Interface: All user interaction accomplished via standard web browser interface.

Solutions requiring dedicated software for connectivity are not acceptable.

G. Remote Connectivity: User interface available both internally and externally to the user's network, based on network security preferences. All remote connectivity may be disabled at any time by the user.

H. Automated Notification: Controller capable of sending multiple automated email alerts without intermediate service provider.

I. Notification Customization: User configurable allowing any operational or fault condition to initiate notification to any personnel including (but not limited to) generator service provider.

J. Environmentally Hardened Design: Open circuit boards, edge cards, and PC ribbon cable connections are unacceptable.

K. Circuit boards with surface-mounted components to provide vibration durability. Circuit boards utilizing large capacitors or heat sinks must utilize encapsulation methods to securely support these components.

L. Configuration:

1. Operating and safety indications, protective devices, basic system controls, and engine gauges shall be grouped in a common control and monitoring panel mounted on the engine generator. Mounting method shall isolate the control panel from engine generator vibration.

Panel powered from the engine generator battery.

Page 1118 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 9
M. Control and Monitoring Panel:

1. Digital engine generator controller with integrated touch screen, controls, and microprocessor, capable of local and remote control, monitoring, and programming, with battery backup.

2. Instruments: Located on the control and monitoring panel and viewable during operation. a. Engine lubricating-oil pressure gauge.
b. Engine-coolant temperature gauge.
c. DC voltmeter (alternator battery charging).
d. Running-time meter.
e. AC voltmeter, for each phase.
f. AC ammeter, for each phase.
g. AC frequency meter.
h. Generator-voltage adjusting feature.

3. Controls and Protective Devices: Controls, shutdown devices, and common alarm indication, including the following:
a. Cranking control equipment.
b. Run-Off-Auto switch.
c. Control switch not in automatic position alarm.
d. Overcrank alarm.
e. Overcrank shutdown device.
f. Low-water temperature alarm.
g. High engine temperature pre-alarm.
h. High engine temperature.
i. High engine temperature shutdown device.
j. Overspeed alarm.
k. Overspeed shutdown device.
l. Low fuel main tank.
1) Low-fuel-level alarm shall be initiated when the level falls below that required for operation for duration required
m. Coolant low-level alarm.
n. Coolant low-level shutdown device.
o. Coolant high-temperature prealarm.
p. Coolant high-temperature alarm.
q. Coolant low-temperature alarm.
r. Coolant high-temperature shutdown device.
s. EPS load indicator.
t. Battery high-voltage alarm.
u. Low cranking voltage alarm.
v. Battery-charger malfunction alarm.
w. Battery low-voltage alarm.
x. Lamp test.
y. Contacts for local and remote common alarm.
z. Remote manual stop shutdown device.
aa. Generator overcurrent-protective-device not-closed alarm. bb. Hours of operation.
cc. Engine generator metering, including voltage, current, hertz, kilowatt, kilovolt ampere, and power factor.

N. Connection to Datalink:

Page 1119 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 10

1. A separate terminal block, factory wired to Form C dry contacts, for each alarm and status indication.

2. Provide connections for datalink transmission of indications to remote data terminals via Modbus Data system connections to terminals are covered in Section 260913 "Electrical Power Monitoring and Control."
O. Common Remote Panel with Common Audible Alarm: Include necessary contacts and terminals in control and monitoring panel. Remote panel shall be powered from the engine generator battery.

P. Remote Alarm Annunciator: An LED indicator light labeled with proper alarm conditions shall identify each alarm event, and a common audible signal shall sound for each alarm condition.

Silencing switch in face of panel shall silence signal without altering visual indication. Connect so that after an alarm is silenced, clearing of initiating condition will reactivate alarm until silencing switch is reset. Cabinet and faceplate are surface- or flush-mounting type to suit mounting conditions indicated.

1. Overcrank alarm.

2. Low water-temperature alarm.

3. High engine temperature pre-alarm.

4. High engine temperature alarm.

5. Low lube oil pressure alarm.

6. Overspeed alarm.

7. Low fuel main tank alarm.

8. Low coolant level alarm.

9. Low cranking voltage alarm.

10. Contacts for local and remote common alarm.

11. Audible-alarm silencing switch.

12. Air shutdown damper when used.

13. Run-Off-Auto switch.

14. Control switch not in automatic position alarm.

15. Fuel tank derangement alarm.

16. Fuel tank high-level shutdown of fuel supply alarm.

17. Lamp test.

18. Low-cranking voltage alarm.

19. Generator overcurrent-protective-device not-closed alarm.

Q. Remote Emergency-Stop Switch: Flush; wall mounted unless otherwise indicated; and labeled.

Push button shall be protected from accidental operation.

2.7 GENERATOR OVERCURRENT AND FAULT PROTECTION
A. Overcurrent protective devices shall be coordinated to optimize selective tripping when a short circuit occurs.

1. Overcurrent protective devices for the entire EPSS shall be coordinated to optimize selective tripping when a short circuit occurs. Coordination of protective devices shall consider both utility and EPSS as the voltage source.

2. Overcurrent protective devices for the EPSS shall be accessible only to authorized personnel.

B. Generator Overcurrent Protective Device:

Page 1120 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 11

1. Insulated-case circuit breaker, electronic-trip type; 100 percent rated; complying with UL 489:
a. Tripping Characteristics: Adjustable long-time and short-time delay and instantaneous.
b. Trip Settings: Selected to coordinate with generator thermal damage curve. c. Shunt Trip: Connected to trip breaker when engine generator is shut down by other protective devices.
d. Mounting: Adjacent to, or integrated with, control and monitoring panel.

C. Generator Protector: Microprocessor-based unit shall continuously monitor current level in each phase of generator output, integrate generator heating effect over time, and predict when thermal damage of alternator will occur. When signaled by generator protector or other engine generator protective devices, a shunt-trip device in the generator disconnect switch shall open the switch to disconnect the generator from load circuits. Protector performs the following functions:

1. Initiates a generator overload alarm when generator has operated at an overload equivalent to 110 percent of full-rated load for 60 seconds. Indication for this alarm is integrated with other engine generator malfunction alarms. Contacts shall be available for load shed functions.

2. Under single- or three-phase fault conditions, regulates generator to 300 percent of rated full-load current for up to 10 seconds.

3. As overcurrent heating effect on the generator approaches the thermal damage point of the unit, protector switches the excitation system off, opens the generator disconnect device, and shuts down the engine generator.

4. Senses clearing of a fault by other overcurrent devices and controls recovery of rated voltage to avoid overshoot.

D. Ground-Fault Indication: Comply with NFPA 70, "Emergency System" signals for ground fault.

1. Indicate ground fault with other engine generator alarm indications.

2. Trip generator protective device on ground fault.

E. Arc Energy Reduction: Comply with NFPA 70 for arc energy reduction for circuit breakers 1200A and greater.

1. Energy-reducing maintenance switch with local status indicator.

2. Instantaneous override that is less than the available arcing current.

2.8 GENERATOR, EXCITER, AND VOLTAGE REGULATOR
A. Comply with NEMA MG 1.

B. Drive: Generator shaft shall be directly connected to engine shaft. Exciter shall be rotated integrally with generator rotor.

C. Electrical Insulation: Class H.

D. Stator-Winding Leads: Brought out to terminal box to permit future reconnection for other voltages if required. Provide 12 lead alternator.

E. Construction shall prevent mechanical, electrical, and thermal damage due to vibration, overspeed up to 125 percent of rating, and heat during operation at 110 percent of rated capacity.

Page 1121 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 12
F. Enclosure: Dripproof.

G. Instrument Transformers: Mounted within generator enclosure.

H. Voltage Regulator: Solid-state type, separate from exciter, providing performance as specified and as required by NFPA 110.

1. Voltage Adjustment on Control and Monitoring Panel: Provide plus or minus 5 percent adjustment of output-voltage operating band.

2. Maintain voltage within 30 percent on one step, full load.

3. Provide anti-hunt provision to stabilize voltage.

4. Maintain frequency within 5 percent and stabilize at rated frequency within 5 seconds.

I. Strip Heater: Thermostatically controlled unit arranged to maintain stator windings above dew point.

J. Windings: Two-thirds pitch stator winding and fully linked amortisseur winding.

K. Subtransient Reactance: 15 percent maximum, based on the rating of the engine generator set.

2.9 OUTDOOR ENGINE GENERATOR ENCLOSURE
A. Generator packaged within sound attenuated enclosure.

B. Sound Insulation: Enclosure and air discharge hood completely lined with 3 inches of fiberglass and perforated aluminum.

C. Enclosure Construction: Minimum 14 gauge steet with hinged, removable doors to allow access to the engine, alternator, and control panel. Adjustable hinges for door alignment. Hinges and all exposed fasteners must be stainless steel. Pop-rivets weaken the paint system and are not allowed on external painted surfaces. Each door equipped with lockable hardware and identical keys.

D. Upward discharging enclosure ventilation exhaust hood.

E. Enclosure Finish: Electrostatic applied powered paint, baked and finished to manufacturer's specifications.

F. Enclosure Color: Manufacturers standard Color
G. Silencer mounted on top of enclosure.

H. Engine-Cooling Airflow through Enclosure: Maintain temperature rise of system components within required limits when unit operates at 110 percent of rated load for two hours with ambient temperature at top of range specified in system service conditions.

1. Louvers: Fixed-engine, cooling-air inlet and discharge. Stormproof and drainable louvers prevent entry of rain and snow.

2. Ventilation: Provide temperature-controlled exhaust fan interlocked to prevent operation when engine is running.

Page 1122 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 13
I. Interior Lights with Switch: Factory-wired, vapor-proof luminaires within housing; arranged to illuminate controls and accessible interior. Arrange for external electrical connection.

1. AC lighting system and connection point for operation when remote source is available.

2. DC lighting system for operation when remote source and generator are both unavailable.

J. Convenience Outlets: Factory-wired, GFCI. Arrange for external electrical connection.

2.10 VIBRATION ISOLATION DEVICES
A. Elastomeric Isolator Pads: Oil- and water-resistant elastomer or natural rubber, arranged in single or multiple layers, molded with a nonslip pattern and galvanized-steel baseplates of sufficient stiffness for uniform loading over pad area, and factory cut to sizes that match requirements of supported equipment.

1. Material: Standard neoprene separated by steel shims.

2. Shore A Scale Durometer Rating: 70

3. Number of Layers: 1
B. Restrained Spring Isolators: Freestanding, steel, open-spring isolators with seismic restraint.

1. Housing: Steel with resilient vertical-limit stops to prevent spring extension due to wind loads or if weight is removed; factory-drilled baseplate bonded to 1/4-inch thick, elastomeric isolator pad attached to baseplate underside; and adjustable equipment-mounting and - leveling bolt that acts as blocking during installation.

2. Outside Spring Diameter: Not less than 80 percent of compressed height of the spring at rated load.

3. Minimum Additional Travel: 50 percent of required deflection at rated load.

4. Lateral Stiffness: More than 80 percent of rated vertical stiffness.

5. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.

6. Minimum Deflection: 1 Inch
C. Vibration isolation devices shall not be used to accommodate misalignments or to make bends.

2.11 FINISHES
A. Indoor and Outdoor Enclosures and Components: Manufacturer's standard finish over corrosionresistant pretreatment and compatible primer.

B. Powder coated paint surfaces:

1. Minimum Paint Thickness: 2.5 mil in accordance with ASTM D 1186-87.

2. Material Hardness: ASTM D3363-92a.

3. Resistance to Cracking: ASTM D522-B.

4. Paint Adhesion: ASTM D3359-B.

5. Resistance to Salt Water Corrosion: ASTM B117, ASTM D1654.

6. Resistance to Humidity: ASTM D1735, ASTM D1654.

7. Impact Resistance: ASTM 2784.

8. UV Protection: SAE J1690.

Page 1123 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 14

2.12 SOURCE QUALITY CONTROL
A. Prototype Testing: Factory test engine generator using same engine model, constructed of identical or equivalent components and equipped with identical or equivalent accessories.

1. Tests: Comply with IEEE 115 and with NFPA 110.

B. Project-Specific Equipment Tests: Before shipment, factory test engine generator and other system components and accessories manufactured specifically for this Project. Perform tests at rated load and power factor. Include the following tests:

1. Test components and accessories furnished with installed unit that are not identical to those on tested prototype to demonstrate compatibility and reliability.

2. Test generator, exciter, and voltage regulator as a unit.

3. Full load run.

4. Maximum power.

5. Voltage regulation.

6. Transient and steady-state governing.

7. Single-step load pickup.

8. Safety shutdown.

9. Provide 14 days' advance notice of tests and opportunity for observation of tests by Owner's representative.

10. Report factory test results within 10 days of completion of test.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas, equipment bases, and conditions, with Installer present, for compliance with requirements for installation and other conditions affecting packaged engine generator performance.

B. Examine roughing-in for piping systems and electrical connections. Verify actual locations of connections before packaged engine generator installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service in accordance with requirements indicated:

1. Notify Construction Manager no fewer than 2 working days in advance of proposed interruption of electrical service.

3.3 INSTALLATION
A. Comply with NECA 1 and NECA 404.

Page 1124 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 15
B. Comply with packaged engine generator manufacturers' written installation and alignment instructions and with NFPA 110
C. Equipment Mounting:

1. Install packaged engine generators on cast-in-place concrete equipment bases. Comply with requirements for equipment bases and foundations specified in Section 033000 "Castin-Place Concrete."

2. Coordinate size and location of concrete bases for packaged engine generators. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified with concrete.

D. Install packaged engine generator to provide access, without removing connections or accessories, for periodic maintenance.

3.4 IDENTIFICATION
A. Install a sign indicating the generator neutral is bonded to the main service neutral at the main service location.

3.5 FIELD QUALITY CONTROL
A. Testing Agency:

1. Owner will engage a qualified testing agency to perform tests and inspections.

2. Engage a qualified testing agency to perform tests and inspections.

3. Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.

4. Perform tests and inspections with the assistance of a factory-authorized service representative.

B. Tests and Inspections:

1. Perform tests recommended by manufacturer and each visual and mechanical inspection and electrical and mechanical test listed in first two subparagraphs below, as specified in NETA ATS. Certify compliance with test parameters.
a. Visual and Mechanical Inspection:
1) Compare equipment nameplate data with Drawings and the Specifications. 2) Inspect physical and mechanical condition.
3) Inspect anchorage, alignment, and grounding.
4) Verify that the unit is clean.
b. Electrical and Mechanical Tests:
1) Test protective relay devices.
2) Verify phase rotation, phasing, and synchronized operation as required by the application.
3) Functionally test engine shutdown for low oil pressure, overtemperature, overspeed, and other protection features as applicable. 4) Perform vibration test for each main bearing cap.

Page 1125 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 16
5) Verify correct functioning of the governor and regulator.

2. NFPA 110 Acceptance Tests: Perform tests required by NFPA 110 that are additional to those specified here, including, but not limited to, single-step full-load pickup test.

3. Battery Tests: Equalize charging of battery cells in accordance with manufacturer's written instructions. Record individual cell voltages.
a. Measure charging voltage and voltages between available battery terminals for fullcharging and float-charging conditions. Check electrolyte level and specific gravity under both conditions.
b. Test for contact integrity of all connectors. Perform an integrity load test and a capacity load test for the battery.
c. Verify acceptance of charge for each element of the battery after discharge. d. Verify that measurements are within manufacturer's specifications.

4. Battery-Charger Tests: Verify specified rates of charge for both equalizing and floatcharging conditions.

5. System Integrity Tests: Methodically verify proper installation, connection, and integrity of each element of engine generator system before and during system operation. Check for air, exhaust, and fluid leaks.

6. Exhaust-System Back-Pressure Test (non-enclosed units): Use a manometer with a scale exceeding 40-inch wg. Connect to exhaust line close to engine exhaust manifold. Verify that back pressure at full-rated load is within manufacturer's written allowable limits for the engine.

7. Exhaust Emissions Test: Comply with applicable government test criteria.

8. Voltage and Frequency Transient Stability Tests: Use recording oscilloscope to measure voltage and frequency transients for 50 and 100 percent step-load increases and decreases, and verify that performance is as specified.

9. Harmonic-Content Tests: Measure harmonic content of output voltage at 25 and 100 percent of rated linear load. Verify that harmonic content is within specified limits.

C. Coordinate tests with tests for transfer switches and run them concurrently.

D. Test instruments shall have been calibrated within the past 12 months, traceable to NIST Calibration Services, and adequate for making positive observation of test results. Make calibration records available for examination on request.

E. Leak Test: After installation, charge exhaust, coolant, and fuel systems and test for leaks. Repair leaks and retest until no leaks exist.

F. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation for generator and associated equipment.

G. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

H. Remove and replace malfunctioning units and retest as specified above.

I. Retest: Correct deficiencies identified by tests and observations, and retest until specified requirements are met.

J. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation resistances, time delays, and other values and observations. Attach a label or tag to each tested component indicating satisfactory completion of tests.

Page 1126 of 1236 ends

SECTION 26 32 13.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS DIESEL-ENGINE-DRIVEN GENERATOR SETS 26 32 13.13 - 17

3.6 MAINTENANCE SERVICE
A. Initial Maintenance Service: Beginning at Substantial Completion, maintenance service shall include 12 months' full maintenance by skilled employees of manufacturer's authorized service representative. Include quarterly preventive maintenance and exercising to check for proper starting, load transfer, and running under load. Include routine preventive maintenance as recommended by manufacturer and adjusting as required for proper operation. Parts shall be manufacturer's authorized replacement parts and supplies.

3.7 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain packaged engine generators.

END OF SECTION

Page 1127 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1128 of 1236
SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 1
PART 1 GENERAL

1.01 Scope
Furnish and install automatic transfer switch(es) with number of poles, amperage, voltage, and withstand current ratings as shown on the plans. Basis of design is a Generac TX Transfer Switch Non Service Entrance Rated Delayed/Programmed Transition, 600A , 3 Pole 4 Wire 208V , Transfer Switch in a Nema 1 Enclosure. Each automatic transfer shall consist of a mechanically held power transfer switch unit and a microprocessor controller, interconnected to provide complete automatic operation. All transfer switches and control panels shall be the product of the same manufacturer.

1.02 Acceptable Manufacturers
Automatic transfer switches shall be Generac TX Series. Any alternate shall be submitted to the consulting engineer in writing at least 10 days prior to bid. Each alternate bid must list any deviations from this specification.

1.03 Codes and Standards
The automatic transfer switches and accessories shall conform to the requirements of:

A. UL 1008 - Standard for Automatic Transfer Switches
B. NFPA 70 - National Electrical Code (2017 version and later for start circuit monitoring) C. NEC Articles 700, 701, 702, 708
D. NFPA 99 – Health Care Facilities
E. NFPA 110 – Emergency and Standby Power Systems
F. IEEE Standard 446 – IEEE Recommended Practice for Emergency and Standby Power Systems for Commercial and Industrial Applications
G. NEMA Standards ICS10, MG1, MG250, ICS6, AB1
H. ANSI C62.41
I. International Standards Organization: ISO 8528, 9001.

J. Where seismic rating and/or certification is required: IBC 2018, OSHPD PART 2 PRODUCTS

2.01 Mechanically Held Transfer Switch
A. The basis of design is the Generac TX Series Transfer switch that utilities a knife blade mechanically latching design with maintenance free contacts. The transfer switch unit shall be an electrically operated and mechanically held. The open transition switch shall be mechanically interlocked to ensure only one of two possible positions, normal or emergency. The delayed transition switch shall be mechanically interlocked to ensure one of three possible position, normal and emergency.

B. The switch shall be positively locked and unaffected by momentary outages so that contact pressure is maintained at a constant value and temperature rise at the contacts is minimized for maximum reliability and operating life.

C. All main contacts shall be silver composition. Switches shall have segmented blow-on construction for high withstand current capability and be protected by separate arcing contacts.

D. A manual operating handle shall be provided for maintenance purposes.

E. Designs utilizing components of or parts thereof which are not intended for continuous duty, repetitive switching or transfer between two active power sources are not acceptable.

Page 1129 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 2
F. Where neutral conductors must be switched, the ATS shall be provided with fully rated neutral transfer contacts.

G. Where neutral conductors are to be solidly connected, a neutral terminal plate with fully rated AL-CU pressure connectors shall be provided.

H. The switch shall be capable of the following methods of transfer: Open with In-Phase transition only, Time Delay in Neutral transition, or In-Phase transition with a default to Time Delay in Neutral.

2.02 ATS Control with Integrated User Interface Panel
A. The basis of design is the Generac TXC-100 Controller with Integrated User Interface Panel which is voltage agnostic for service purposes removing the need for technicians to carry and support control panels for every available voltage. Any manufacturers that provide a controller or control panel that does not meet this requirement should notify the consulting engineer before bidding.

B. The controller shall be connected to the transfer switch by an interconnecting wiring harness. The harness shall include a keyed disconnect plug to enable the controller to be disconnected from the transfer switch for routine maintenance.

C. The controller shall direct the operation of the transfer switch. The controller's sensing and logic shall be controlled by a built-in microprocessor for maximum reliability, minimum maintenance, and include standard on-board serial communications capability.

D. A user accessible USB port shall be provided to facilitate firmware updates, uploading of switch operational parameters, downloading of event history and switch operational statistics. This USB port shall be front accessible without opening the ATS door.

E. The controller shall provide single and three phase capability for maximum application flexibility and minimal spare part requirements. Voltage sensing shall be true RMS type and shall be accurate to ± 1% of nominal voltage. Frequency sensing shall be accurate to ± 0.1Hz. Time delay settings shall be accurate to ±0.5% of the full-scale value of the time delay. The panel shall be capable of operating over a temperature range of -20 to + 70 degrees C.

F. The controller power supply shall be field-configurable to operate on 120V through 480V systems without the need for transformers.

G. Control logic shall be backed up with a rechargeable, user-replaceable lithium-ion battery that shall also maintain control power for up to 60 minutes in the event no source power is available.

H. The controller shall be enclosed with a protective cover and be mounted separate from the transfer switch unit for safety and ease of maintenance.

I. The controller shall meet or exceed the requirements for Electromagnetic Compatibility (EMC) as follows:

1. IEC 61000 – 4 – 3 Radiated RF Field Immunity

2. IEC 61000 – 4 – 4 Electrical Fast Transient/Burst Immunity

3. IEC 61000 – 4 – 5 Surge Immunity

4. IEC 61000 – 4 – 6 Conducted RF Immunity

5. IEC 61000 – 4 -11 Voltage Dips and Interruptions

6. EN 61000 – 6 - 2 Industrial Immunity Requirements EN 61000-6-4 - Radiated Emissions

7. EN 61000 – 6 - 4 Conducted Emissions

8. CISPR 11 – Conducted RF Emissions and Radiated RF Emissions

2.03 Enclosure

Page 1130 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 3
The basis of design is a Generac TX Series Transfer Switch in a Nema 1 Enclosure, with dimensions no larger than Not SE Rated Inches in Height , 63.19 Inches in Width, and 28.22 Inches In Depth. Larger enclosures than the basis of design will need to be approved by the Consulting Engineer to ensure there is enough wall space and appropriate clearance.

A. Provide a temperature and humidity controlled anti-condensation heater for all NEMA 3R and 4X enclosed units. Heater shall be an available option on NEMA 1 enclosures, when called for on plans. Heater cover to indicate a hot surface.

B. The switch mechanism and controller shall be easily removable from the enclosure in the field. This requirement will facilitate easy single-person installation on wall mounted switches, conduit fitting, and cable pulling while minimizing risk of damage and/or contamination of ATS components during the install process.

C. Controller human interface and USB port shall be visible and operational through the enclosure door, without the need for personal protective equipment, avoiding arc-flash hazard for routine checks of the controller status.

PART 3 OPERATIONS

3.01 Controller Display and Keypad
A. A backlit four-line graphical LCD display and human interface shall be an integral part of the controller for viewing all available data and setting desired operational parameters. Operational parameters shall also be available for viewing and limited control through the RS-485 communications port.

B. All instructions and controller settings shall be easily accessible, readable and accomplished without the use of codes, calculations, or instruction manuals.

C. The user interface shall be provided with test/reset modes. The test mode will simulate a normal source failure. The reset mode shall bypass the time delays on either transfer to emergency or retransfer to normal.

D. The following parameters shall only be adjustable only by authorized service personnel:

1. Nominal line voltage and frequency

2. Single or three phase sensing on normal

3. Transfer operating mode configuration, (open transition, or delayed transition)

3.02 Voltage and Frequency Sensing
A. Voltage and frequency on both the normal and emergency sources (as noted below) shall be continuously monitored, with the following pickup, dropout, and trip settings capabilities; values shown as percentage of nominal unless otherwise specified.

Voltage and Frequency Settings Range Default Value
Source 1 (Normal) is Genset Yes or No No
Source 1 Undervoltage Dropout 50-97% 85%
Source 1 Undervoltage Pickup 52-99% 90%
Source 1 Overvoltage Dropout 105-120% 110%

Page 1131 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 4
Source 1 Overvoltage Pickup 103-118% 105%
Source 1 Underfrequency
Dropout
90-97% 90%
Source 1 Underfrequency Pickup 91-99% 95%
Source 1 Overfrequency Dropout 103-110% 105%
Source 1 Overfrequency Pickup 101-109% 102%
Source 1 Voltage Imbalance Drop 5-20% 5%
Source 1 Voltage Imbalance
Pickup
3-18% 3%
Source 1 Warmup Time 0-1800s 3s
Source 1 Cooldown Time 0-1800s 1800s
Source 1 Minimum Run Time 300-1800s 1200s
Source 2 is Generator Yes or No Yes
Source 2 Undervoltage Dropout 50-97% 85%
Source 2 Undervoltage Pickup 52-99% 90%
Source 2 Overvoltage Dropout 105-120% 110%
Source 2 Overvoltage Pickup 103-118% 105%
Source 2 Underfrequency
Dropout
90-97% 90%
Source 2 Underfrequency Pickup 91-99% 99%
Source 2 Overfrequency Dropout 103-110% 105%
Source 2 Overfrequency Pickup 101-109% 102%
Source 2 Voltage Imbalance Drop 5-20% 5%
Source 2 Voltage Imbalance
Pickup
3-18% 3%
Source 2 Minimum Run Time 300-1800s 1200s
Source 2 Warmup Time 0-1800s 3s
Source 2 Cooldown Time 0-1800s 1800s
Phase Rotation Check ABC, CBA, OFF ABC
Supply Overvoltage 350 VAC Fixed
Manual Return to Normal Yes or No
Time Delay Settings

Page 1132 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 5
Transfer to Emergency 120s max 30s
Re-transfer to Normal 1,800s max 1,800s
Time Delay Neutral 120s max 30s
Engine Cool Down 300-1,800s 1,800s
Delayed Transition Time 120s max 120s
Elevator Signal 120s max 30s
In Phase Transfer Yes or No
In Phase Synchronization Time 60-3600s 300s
Preferred Source S1, S2 S1
Voltage Imbalance Enable Yes or No
Voltage Imbalance Timeout 10-30s max 20s
B. Repetitive accuracy of all settings shall be within 1% at +25C C. Voltage and frequency settings shall be field adjustable in 1% increments either locally with the display and keypad or remotely via RS-485 communications port access.

D. Source status screens shall be provided for both normal & emergency to provide digital readout of voltage and frequency.

E. The backlit graphical display shall have multiple language capability. Languages can be selected from the user interface.

3.03 Time Delays
A. A Line Interrupt delay shall be provided to override momentary normal source outages, delay all transfer and engine starting signals; adjustable 0 to 120 seconds. It shall be possible to bypass the time delay from the controller user interface.

B. An Engine Warm Up delay shall be provided for extended engine RPM stabilization where fast transfer to the emergency source is not required; adjustable 0 to 1,800 seconds. It shall be possible to bypass the time delay from the controller user interface.

C. A Transfer to Emergency delay shall be provided for controlled sequencing of loads to the emergency source; adjustable from 0 to 120 seconds. It shall be possible to bypass the time delay from the controller user interface.

D. A Retransfer to Normal delay shall be provided to ensure stability of the normal source, adjustable from 0 to 1,800 seconds. Time delay shall be automatically bypassed if the emergency source fails and normal source is acceptable.

E. An Engine Minimum Runtime delay shall be provided to reduce nuisance starts when the normal source power is unstable but does not trigger a transfer to the emergency source, adjustable from 5 to 30 minutes. Operates in conjunction with Engine Cool Down delay.

F. An Engine Cool Down delay shall be provided; adjustable 300 – 1,800 seconds.

Page 1133 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 6
G. An Elevator Signal Before Transfer output signal shall be provided to drive an external relay for selective load disconnect control. The controller shall have the ability to activate an adjustable 0 to 120 second delay in any of the following modes:

1. Prior to transfer only.

2. Prior to and after transfer.

3. Normal to emergency only.

4. Emergency to normal only.

5. Normal to emergency and emergency to normal.

6. All transfer conditions or only when both sources are available.

H. For special applications (i.e. three-sources), the option to select the Preferred Source.

I. All adjustable time delays shall be field adjustable without the use of special tools or software.

Time Delay Summary Table:

Time Delay Description Range Default Value
Line Interrupt Delay 0 – 120 sec. 3 sec.

Engine Warm Up Delay 0 – 1,800 sec. 3 sec.

Transfer to Emergency 0 – 120 sec. 3 sec.

Retransfer to Normal 0 – 1,800 sec. 1,800 sec.

Engine Minimum Run Time 5 – 30 min. 5 min.

Engine Cool Down 300 – 1,800 sec. 1,800 sec.

Delayed Transition (Center Off Position) 0 – 120 sec. 120 sec.

Elevator Signal Before Transfer 0 – 120 sec. 0 sec.

Preferred Source Normal (S1), Emerg. (S2) Normal (S1)

3.04 External Control Interfaces and Indicators
A. Communications connectors, user interface and display shall be accessible and usable without presenting an arcflash hazard.

B. Customer inputs shall be optically isolated for wider compatibility with external systems. This will protect the controller from external surges and transient voltages.

C. Surge Protection for the ATS controls shall be provided.

D. Replaceable fuses to protect the power supply to the ATS control panel.

E. A set of contacts rated 5 amps, 30 VDC shall be provided for a low-voltage engine start signal. The start signal shall prevent dry cranking of the engine by requiring the generator set to reach proper output and run for the duration of the Engine Minimum Runtime setting, regardless of whether the normal source restores before the load is transferred.

F. Engine starting contacts shall facilitate start-circuit monitoring to comply with the 2017 and later versions of NFPA 70 Article 700.10 (D)(3).

G. Two sets of Form-C auxiliary contacts, rated 10 amps, 250 VAC shall be provided to indicate the switch actuator position, including center-off for Time Delay Neutral switches or a Permissive (Emergency Inhibit) condition.

H. A single General Alarm (summary alarm) indication shall light up the alert indicator and de-energize the configured common alarm output relay for external monitoring.

I. LED indicating lights shall be provided; one to indicate when the ATS is connected to the normal source and one to indicate when the ATS is connected to the emergency source.

J. LED indicating lights shall be provided and energized by controller outputs. The lights shall provide true source availability of the normal and emergency source, as determined by the voltage sensing trip and reset settings for each source.

K. LED indicating light shall be provided to indicate switch not in automatic mode (manual).

L. LED indicating light shall be provided to indicate any alarm condition.

M. The controller shall have two programmable inputs and one programmable output as standard; with an optional expansion board to add up to four programmable input/outputs. Programmable I/O conditions shall include:

Page 1134 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 7
Programmable Output Programmable Input
Source 1 – Two Wire Start Permissive (Emergency Inhibit) Source 2 – Two Wire Start Remote Engine Fast Test
Engine Exercising Remote Engine Normal Test
Engine Warmup ATS Timer
Signal Before Transfer Initiate Demand Response
General Alarm
Source 1 Good
Source 2 Good
N. System Status - The controller LCD display shall include a System Status screen which shall be accessible from any point in the menu system by depressing the “ESC” key until you arrive at the System Status screen. This screen shall display a clear description of the active operating sequences and switch position. Operational status information displayed shall include:

1. Source 1 status (good or bad)

2. Source 2 status (good or bad)

3. Any active timer

4. Permissive (Emergency Inhibit when active)

3.05 Transfer and Exercise Controls
The following standard features shall be built into the controller, capable of being activated through keypad programming as required by the user:

A. Provide the ability to select “commit/no commit to transfer” to determine whether the load should be transferred to the emergency generator if the normal source restores before the generator is ready to accept the load.

B. An engine generator exercising timer shall be provided to configure daily, day of week, weekly, bi-weekly, or monthly testing of an engine generator set at a specified time of day with or without load for a programmable period of time (Engine Minimum Runtime).

C. Terminals shall be provided for a remote contact to signal the ATS to transfer to emergency for remote test. Test signal can be enabled through the keypad or digital input. Transfer to emergency for demand response can be enabled by a digital input.

D. For In-Phase Transfer Switch Designs: An in-phase monitor shall be provided in the controller such that the transfer occurs with less than ten degrees phase angle difference between sources. The monitor shall control transfer so that motor load inrush currents do not exceed normal starting currents and shall not require external control of power sources. In-phase switch transfer time shall not exceed 25ms.

PART 4 ADDITIONAL FEATURES AND ACCESSORIES

4.01 Additional Optional Features
A. Expanded Input/Output Module. Expandable Input/Output Board Module Includes: 4 Relay Outputs and 4 Optically Isolated Inputs
PART 5 ADDITIONAL REQUIREMENTS

5.01 Withstand and Closing Ratings
A. The ATS shall be rated to close on and withstand the available RMS symmetrical short circuit current at the ATS terminals with the type of overcurrent protection shown on the plans. The basis of design for this project is a Generac

Page 1135 of 1236 ends

SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFER SWITCH 26 36 23 - 8
TX Series Automatic Transfer Switch with a 50ka 3 Cycle Rating, 50ka (.05 seconds) Time Based Rating, and a 85ka Specific Breaker Rating Transfer switches from other manufacturers with ratings less than provided in this section will need to be
B. Provide a temperature and humidity controlled anti-condensation heater for all NEMA 3R and 4X enclosed units.

Heater shall be an available option on NEMA 1 enclosures, when called for on plans. Heater cover to indicate a hot surface.

C. The switch mechanism and controller shall be easily removable from the enclosure in the field. This requirement will facilitate easy single-person installation on wall mounted switches, conduit fitting, and cable pulling while minimizing risk of damage and/or contamination of ATS components during the install process.

D. Controller human interface and USB port shall be visible and operational through the enclosure door, without the need for personal protective equipment, avoiding arc-flash hazard for routine checks of the controller status.

5.02 Tests and Certification
A. The complete ATS shall be factory tested to ensure proper operation of the individual components and correct overall sequence of operation and to ensure that the operating transfer time, voltage, frequency and time delay settings are in compliance with the specification requirements.

B. The ATS manufacturer shall be certified to ISO 9001: 2015 International Quality Standard and the manufacturer shall have third party certification verifying quality assurance in design/development, production, installation and servicing in accordance with ISO 9001: 2015.

5.03 Service Representation
A. The ATS manufacturer shall support a service organization of company-employed personnel located throughout the contiguous United States. The service center's personnel must be factory trained and must be on call 24 hours a day, 365 days a year.

B. The manufacturer shall maintain records of switch shipments, by serial number, for a minimum of 10 years.

5.04 Warranty
A. The basis of design is a Generac TX Series Automatic Transfer Switch with a Comprehensive 5 Year Warranty.

B. A Basic Warranty is defined as the manufacturer covering replacement parts for the listed amount of the warranty period.

C. The Comprehensive Warranty is defined as the manufacturer covering replacement parts, labor, and limited technician travel costs for covered warranty repairs during the listed warranty period.

D. The switch mechanism and controller shall be easily removable from the enclosure in the field. This requirement will facilitate easy single-person installation on wall mounted switches, conduit fitting, and cable pulling while minimizing risk of damage and/or contamination of ATS components during the install process.

E. Controller human interface and USB port shall be visible and operational through the enclosure door, without the need for personal protective equipment, avoiding arc-flash hazard for routine checks of the controller status.

END OF SECTION

Page 1136 of 1236 ends

SECTION 26 51 00 INTERIOR LIGHTING
INTERIOR LIGHTING 265100 - 1
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Interior lighting fixtures, lamps.

2. Emergency lighting units.

3. Exit signs.

4. Lighting fixture supports.

B. Related Sections:

1. Division 26 Section "Lighting Control Devices" for automatic control of lighting, including time switches, photoelectric relays, occupancy sensors, and multipole lighting relays and contactors.

1.2 SUBMITTALS
A. Product Data: For each type of lighting fixture, arranged in order of fixture designation. Include data on features, accessories, and finishes.

B. Shop Drawings: Show details of nonstandard or custom lighting fixtures. Indicate dimensions, weights, methods of field assembly, components, features, and accessories. Product Certificates: For each type of ballast for bi-level and dimmer-controlled fixtures, from manufacturer.

C. Field quality-control reports.

1.3 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with NFPA 70.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, product(s) indicated on Drawings.

Substitutions shall be submitted to Engineer minimum (10) days prior to bid date for evaluation.

Page 1137 of 1236 ends

SECTION 26 51 00 INTERIOR LIGHTING
INTERIOR LIGHTING 265100 - 2

2.2 LIGHTING FIXTURE SUPPORT COMPONENTS
A. Comply with Division 26 Section "Hangers and Supports for Electrical Systems" for channeland angle-iron supports and nonmetallic channel and angle supports.

B. Single-Stem Hangers: 1/2-inch steel tubing with swivel ball fittings and ceiling canopy. Finish same as fixture.

C. Twin-Stem Hangers: Two, 1/2-inch steel tubes with single canopy designed to mount a single fixture. Finish same as fixture.

D. Wires: ASTM A 641/A 641M, Class 3, soft temper, zinc-coated steel, 12 gage.

E. Wires for Humid Spaces: ASTM A 580/A 580M, Composition 302 or 304, annealed stainless steel, 12 gage.

F. Rod Hangers: 3/16-inch minimum diameter, cadmium-plated, threaded steel rod.

G. Hook Hangers: Integrated assembly matched to fixture and line voltage and equipped with threaded attachment, cord, and locking-type plug.

PART 3 - EXECUTION

3.1 INSTALLATION
A. Lighting fixtures: Set level, plumb, and square with ceilings and walls. Install lamps in each fixture. Comply with all Seismic requirements.

B. Comply with NFPA 70 for minimum fixture supports.

C. Suspended Lighting Fixture Support:

1. Pendants and Rods: Where longer than 48 inches brace to limit swinging.

2. Stem-Mounted, Single-Unit Fixtures: Suspend with twin-stem hangers.

3. Continuous Rows: Use tubing or stem for wiring at one point and tubing or rod for suspension for each unit length of fixture chassis, including one at each end.

D. Adjust aimable lighting fixtures to provide required light intensities.

E. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."

3.2 FIELD QUALITY CONTROL
A. Test for Emergency Lighting: Interrupt power supply to demonstrate proper operation. Verify transfer from normal power to battery and retransfer to normal.

B. Prepare a written report of tests, inspections, observations, and verifications indicating and interpreting results. If adjustments are made to lighting system, retest to demonstrate compliance with standards.

Page 1138 of 1236 ends

SECTION 26 51 00 INTERIOR LIGHTING
INTERIOR LIGHTING 265100 - 3
END OF SECTION 265100

Page 1139 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1140 of 1236
SECTION 265600 EXTERIOR LIGHTING
EXTERIOR LIGHTING 265600 - 1
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Exterior luminaires with lamps.

1.2 SUBMITTALS
A. Product Data: For each luminaire, pole, and support component, arranged in order of lighting unit designation. Include data on features, accessories, and finishes.

B. Shop Drawings: Anchor-bolt templates keyed to specific poles and certified by manufacturer.

1.3 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with IEEE C2, "National Electrical Safety Code." C. Comply with NFPA 70.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, product(s) indicated on Drawings.

Substitutions shall be submitted to Engineer minimum (10) days prior to bid date for evaluation.

PART 3 - EXECUTION

3.1 LUMINAIRE INSTALLATION
A. Install lamps in each luminaire.

B. Fasten luminaire to indicated structural supports. Comply with all Seismic Requirements.

1. Use fastening methods and materials selected to resist seismic forces defined for the application and approved by manufacturer.

C. Adjust luminaires that require field adjustment or aiming.

Page 1141 of 1236 ends

SECTION 265600 EXTERIOR LIGHTING
EXTERIOR LIGHTING 265600 - 2

3.2 CORROSION PREVENTION
A. Aluminum: Do not use in contact with earth or concrete. When in direct contact with a dissimilar metal, protect aluminum by insulating fittings or treatment.

B. Steel Conduits: Comply with Division 26 Section "Raceway and Boxes for Electrical Systems." In concrete foundations, wrap conduit with 0.010-inch-thick, pipe-wrapping plastic tape applied with a 50 percent overlap.

3.3 GROUNDING
A. Ground metal poles and support structures according to Division 26 Section "Grounding and Bonding for Electrical Systems."

1. Install grounding electrode for each pole unless otherwise indicated.

2. Install grounding conductor pigtail in the base for connecting luminaire to grounding system.

B. Ground nonmetallic poles and support structures according to Division 26 Section "Grounding and Bonding for Electrical Systems."

1. Install grounding electrode for each pole.

2. Install grounding conductor and conductor protector.

3. Ground metallic components of pole accessories and foundations.

END OF SECTION 265600

Page 1142 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 1 of 10
PART 1 GENERAL

1.01 DESCRIPTION
A. This section specifies the finishing, installation, connection, testing of Physical Access Control System, hereinafter referred to as the PACS.

1.02 RELATED WORK
A. All Sections listed in the Table of Contents are a Condition of this Section.

1.03 QUALITY ASSURANCE
A. The Contractor shall be responsible for providing, installing, and the operation of the PACS as shown. The Contractor shall also provide certification as required.

B. The security system will be installed and tested to ensure all components are fully compatible as a system and can be integrated with all associated security subsystems, whether the security system is stand-alone or a part of a complete Information Technology (IT) computer network.

C. Contractor Qualifications:

1. The Contractor or security sub-contractor shall be a licensed security Contractor with a minimum of five (5) years experience installing and servicing systems of similar scope and complexity.

1.04 SUBMITTALS
A. Shop drawing and as-built packages shall include:

1. Specification and scope of work pages for all individual security systems applicable to the design package that will:
a. Outline all general and job specific work required within the design package.
b. Provide a detailed device identification table outlining device Identification (ID) and use for all security systems equipment utilized in the design package.

2. Drawing sheets that will be plotted on the individual floor plans or site plans shall:
a. Include a title block as defined above.
b. Clearly define the drawings scale in both standard and metric measurements.
c. Provide device identification and location.
d. Address all signal and power conduit runs and sizes that are associated with the design of the electronic security system and other security elements (e.g., barriers, etc.).
e. Identify all pull box and conduit locations, sizes, and fill capacities.

Page 1143 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 2 of 10
B. Complete a full review process conducted by the Contractor along with the Owner’s representative to ensure all work has been clearly defined and completed. All reviews shall be conducted in accordance with the project schedule.

C. Provide manufacturer security system product cut-sheets. Submit for approval at least 30 days prior to commencement of formal testing, a Security System Operational Test Plan.

Include procedures for operational testing of each component and security subsystem, to include performance of an integrated system test.

D. Submit manufacture’s certification of Underwriters Laboratories, Inc. (UL) listing as specified. Provide all maintenance and operating manuals per Section 01 00 00, GENERAL REQUIREMENTS.

E. General: Submittals shall be in full compliance of the Contract Documents. All submittals shall be provided in accordance with this section. Submittals lacking the breath or depth these requirements will be considered incomplete and rejected. Submissions are considered multidisciplinary and shall require coordination with applicable divisions to provide a complete and comprehensive submission package. Additional general provisions are as follows:

1. The Contractor shall schedule submittals in order to maintain the project schedule. For coordination drawings refer to Specification Section 01 33 10 - DESIGN SUBMITTAL PROCEDURES, which outline basic submittal requirements and coordination. Section 01 33 10 shall be used in conjunction with this section.

2. The Contractor shall identify variations from requirements of Contract Documents and state product and system limitations, which may be detrimental to successful performance of the completed work or system.

3. Each package shall be submitted at one (1) time for each review and include components from applicable disciplines (e.g., electrical work, architectural finishes, door hardware, etc.) which are required to produce an accurate and detailed depiction of the project.

4. Manufacturer’s information used for submittal shall have pages with items for approval tagged, items on pages shall be identified, and capacities and performance parameters for review shall be clearly marked through use of an arrow or highlighting. Provide space for Resident Engineer and Contractor review stamps.

5. Technical Data Drawings shall be in the latest version of AutoCAD®, drawn accurately, and in accordance with CAD Standards. FREEHAND SKETCHES

OR COPIED VERSIONS OF THE CONSTRUCTION DOCUMENTS WILL NOT BE ACCEPTED. The Contractor shall not reproduce Contract Documents or copy standard information as the basis of the Technical Data Drawings. If departures from the technical data drawings are subsequently deemed necessary by the Contractor, details of such departures and the reasons thereof shall be submitted in writing to the Resident Engineer for approval before the initiation of work.

6. Packaging: The Contractor shall organize the submissions according to the following packaging requirements:

Page 1144 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 3 of 10
a. Manual Content: In each manual include information specified in the individual Specification section, and the following information for each major component of building equipment and controls:
1) General system or equipment description.
2) Design factors and assumptions.
3) Copies of applicable Shop Drawings and Product Data. 4) System or equipment identification including: manufacturer, model and serial numbers of each component, operating
instructions, emergency instructions, wiring diagrams, inspection and test procedures, maintenance procedures and schedules, precautions against improper use and maintenance, repair instructions, sources of required maintenance materials and related services, and a manual index.
b. Manufacturer’s Data: Where manufacturer's standard printed data is included in the manuals, include only those sheets that are pertinent to the part or product installed. Mark each sheet to identify each part or product included in the installation. Where more than one (1) item in tabular format is included, identify each item, using appropriate references from the Contract Documents. Identify data that is applicable to the installation and delete references to information which is not applicable.
c. Where manufacturer's standard printed data is not available and the information is necessary for proper operation and maintenance of equipment or systems, or it is necessary to provide additional information to supplement the data included in the manual, prepare written text to provide the necessary information. Organize the text in a consistent format under a separate heading for different procedures. Where necessary, provide a logical sequence of instruction for each operating or maintenance procedure. Where similar or more than one product is listed on the submittal the Contractor shall differentiate by highlighting the specific product to be utilized.

F. Operations and Maintenance Manuals: Final copies of the manuals shall be delivered to the Resident Engineer as part of the acceptance test. The draft copy used during site testing shall be updated with any changes required prior to final delivery of the manuals.

Each manual’s contents shall be identified on the cover. The manual shall include names, addresses, and telephone numbers of each sub-contractor installing equipment or systems, as well as the nearest service representatives for each item of equipment for each system. The manuals shall include a table of contents and tab sheets. Tab sheets shall be placed at the beginning of each chapter or section and at the beginning of each appendix. The final copies delivered after completion of the endurance test shall include all modifications made during installation, checkout, and acceptance. Six (6) hard-copies and one (1) soft copy on CD of each item listed below shall be delivered as a part of final systems acceptance.

1.05 APPLICABLE PUBLICATIONS
A. The publications listed below (including amendments, addenda, revisions, supplement, and errata) form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

Page 1145 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 4 of 10
B. American National Standards Institute (ANSI)/ Security Industry Association (SIA):

AC-03 ............................ Access Control: Access Control Guideline Dye Sublimation Printing Practices for PVC Access Control Cards
C. National Fire Protection Association (NFPA):
70-14 ............................. National Electrical Code

1.06 COORDINATION
A. Coordinate arrangement, mounting, and support of electronic safety and security equipment.

PART 2 PRODUCTS

2.01 GENERAL
A. All equipment and materials for the system will be compatible to ensure correct operation as outlined in FIPS 201, March 2006 and HSPD-12.

B. The security system characteristics listed in this section will serve as a guide in selection of equipment and materials for the PACS. If updated or more suitable versions are available then the Contracting Officer will approve the acceptance of prior to an installation.

C. PACS equipment shall meet or exceed all requirements listed below.

2.02 SURGE AND TAMPER PROTECTION
A. Surge Protection: Protect components from voltage surges originating external to equipment housing and entering through power, communication, signal, control, or sensing leads. Include surge protection for external wiring of each conductor-entry connection to components.

1. Minimum Protection for Power Connections 120 V and More: Auxiliary panel suppressors complying with requirements in Division 26 Section "TransientVoltage Suppression for Low-Voltage Electrical Power Circuits."

2. Minimum Protection for Communication, Signal, Control, and Low-Voltage Power Connections: Comply with requirements in Division 26 Section "TransientVoltage Suppression for Low-Voltage Electrical Power Circuits" as recommended by manufacturer for type of line being protected.

B. Tamper Protection: Tamper switches on enclosures, control units, pull boxes, junction boxes, cabinets, and other system components shall initiate a tamper-alarm signal when unit is opened or partially disassembled. Control-station control-unit alarm display shall identify tamper alarms and indicate locations.

2.03 CARD READERS
A. Power: Card reader shall be powered from its associated Controller, including its standby power source.

Page 1146 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 5 of 10
B. Response Time: Card reader shall respond to passage requests by generating a signal that is sent to the Controller. Response time shall be 800ms or less, from the time the card reader finishes reading the credential card until a response signal is generated.

C. Enclosure: Suitable for surface, semi-flush, or pedestal mounting. Mounting types shall additionally be suitable for installation in the following locations:

1. Indoors, controlled environment.

2. Indoors, uncontrolled environment.

3. Outdoors, with built-in heaters or other cold-weather equipment to extend the operating temperature range as needed for operation at the site.

D. Display: LED or other type of visual indicator display shall provide visual and audible status indications and user prompts. Indicate power on/off, whether user passage requests have been accepted or rejected, and whether the door is locked or unlocked.

E. Shall be utilized for controlling the locking hardware on a door and allows for reporting back to the main control panel with the time/date the door was accessed, the name of the person accessing the point of entry, and its location.

F. Will be fully programmable and addressable, locally and remotely, and hardwired to the system.

G. Shall be individually home run to the main panel.

H. Shall be installed in a manner that they comply with:

1. The Uniform Federal Accessibility Standards (UFAS)

2. The Americans with Disabilities Act (ADA)

3. The ADA Standards for Accessible Design
I. Shall support a variety of card readers that must encompass a wide functional range. The PACS may combine any of the card readers described below for installations requiring multiple types of card reader capability (i.e., card only, card and/or PIN, card and/or biometrics, card and/or pin and/or biometrics, supervised inputs, etc.). These card readers shall be available in the approved technology to meet FIPS 201, and is ISO 14443 A or B, ISO/IEC 7816 compliant. The reader output can be Wiegand, RS-22, 485 or TCP/IP.

J. Shall be housed in an aluminum bezel with a wide lead-in for easy card entry.

K. Shall contain read head electronics, and a sender to encode digital door control signals.

L. LED’s shall be utilized to indicate card reader status and access status.

M. Shall be able to support a user defined downloadable off-line mode of operation (e.g. locked, unlocked), which will go in effect during loss of communication with the main control panel.

N. Shall provide audible feedback to indicate access granted/denied decisions. Upon a card swipe, two audible tones or beeps shall indicate access granted and three tones or beeps shall indicate access denied. All keypad buttons shall provide tactile audible feedback.

Page 1147 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 6 of 10
O. Shall have a minimum of two programmable inputs and two programmable outputs.

P. All card readers that utilize keypad controls along with a reader and shall meet the following specifications:

1. Entry control keypads shall use a unique combination of alphanumeric and other symbols as an identifier. Keypads shall contain an integral alphanumeric/special symbols keyboard with symbols arranged in ascending ASCII code ordinal sequence. Communications protocol shall be compatible with the local processor.

Q. Shall include a Light Emitting Diode (LED) or other type of visual indicator display and provide visual or visual and audible status indications and user prompts. The display shall indicate power on/off, and whether user passage requests have been accepted or rejected. The design of the keypad display or keypad enclosure shall limit the maximum horizontal and vertical viewing angles of the keypad. The maximum horizontal viewing angle shall be plus and minus five (5) degrees or less off a vertical plane perpendicular to the plane of the face of the keypad display. The maximum vertical viewing angle shall be plus and minus 15 degrees or less off a horizontal plane perpendicular to the plane of the face of the keypad display.

1. Shall respond to passage requests by generating a signal to the local processor.

The response time shall be 800 milliseconds or less from the time the last alphanumeric symbol is entered until a response signal is generated.

2. Shall be powered from the source as designed and shall not dissipate more than 150 Watts.

3. Shall be suitable for surface, semi-flush, pedestal, or weatherproof mounting as required.

4. Shall provide a means for users to indicate a duress situation by entering a special code.

R. Contactless Smart Cards and Readers

1. Smart card readers shall read credential cards whose characteristics of size and technology meet those defined by ISO/IEC 7816, 14443, 15693.

2. The readers shall have "flash" download capability to accommodate card format changes.

3. The card reader shall have the capability of reading the card data and transmitting the data to the main monitoring panel.

2.04 PUSH BUTTON SWITCHES
A. Push-Button Switches: Momentary-contact back-lighted push buttons, with stainlesssteel switch enclosures.

1. Electrical Ratings:
a. Minimum continuous current rating of 10A at 240-VAC.

Page 1148 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 7 of 10
b. Contacts that will make 720 VA at 60A and that will break at 720 VA at 10A.

2. Enclosures: Flush or surface mounting. Push buttons shall be suitable for flush mounting in the switch enclosures.

3. Enclosures shall additionally be suitable for installation in the following locations:
a. Indoors, controlled environment.
b. Indoors, uncontrolled environment.
c. Outdoors.

4. Power: Push-button switches shall be powered from their associated Controller, using dc control.

2.05 INTERFACES
A. Power Supplies:

1. Shall be UL rated and able to adequately power new and existing entry control devices on a continuous basis without failure.

2. Shall meet the following minimum technical characteristics:

INPUT POWER 110 VAC 60 HZ
OUTPUT VOLTAGE 12 VDC Nominal (13.8 VDC)
24 VDC Nominal (27.6 VDC)
Filtered and Regulated
BATTERY Dependent on Output Voltage shall provide up
to 24 hours of unpowered operation
CHARGING CIRCUIT Built-in standard

2.06 WIRES AND CABLES
A. Provide device input cables as required by manufacturer.

PART 3 EXECUTION

3.01 GENERAL

Page 1149 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 8 of 10
A. The Contractor shall install all system components and appurtenances in accordance with the manufacturers’ instructions, ANSI C2, and shall furnish all necessary interconnections, services, and adjustments required for a complete and operable system as specified. Control signals, communications, and data transmission lines grounding shall be installed as necessary to preclude ground loops, noise, and surges from affecting system operation. Equipment, materials, installation, workmanship, inspection, and testing shall be in accordance with manufacturers’ recommendations and as modified herein.

B. Consult the manufacturers’ installation manuals for all wiring diagrams, schematics, physical equipment sizes, etc., before beginning system installation. Refer to the Riser/Connection diagram for all schematic system installation/termination/wiring data.

C. All equipment shall be attached to walls and ceiling/floor assemblies and shall be held firmly in place (e.g., sensors shall not be supported solely by suspended ceilings).

Fasteners and supports shall be adequate to support the required load.

3.02 EXAMINATION
A. Examine pathway elements intended for cables. Check raceways, cable trays, and other elements for compliance with space allocations, installation tolerances, hazards to cable installation, and other conditions affecting installation.

B. Examine roughing-in for control cable conduit systems, Controllers, card readers, and other cable-connected devices to verify actual locations of conduit and back boxes before device installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.03 CABLING
A. Comply with NECA 1, "Good Workmanship in Electrical Contracting." B. Install cables without damaging conductors, shield, or jacket.

C. Boxes and enclosures containing security system components or cabling, and which are easily accessible to employees or to the public, shall be provided with a lock. Boxes above ceiling level in occupied areas of the building shall not be considered to be accessible. Junction boxes and small device enclosures below ceiling level and easily accessible to employees or the public shall be covered with a suitable cover plate and secured with tamperproof screws.

3.04 CABLE APPLICATION
A. Comply with EIA/TIA-569, "Commercial Building Standard for Telecommunications Pathways and Spaces."
B. Cable application requirements are minimum requirements and shall be exceeded if recommended or required by manufacturer of system hardware.

C. RS-232 Cabling: Install at a maximum distance of 50 feet.

D. RS-485 Cabling: Install at a maximum distance of 4000 feet.

E. Card Readers and Keypads:

Page 1150 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 9 of 10

1. Install number of conductor pairs recommended by manufacturer for the functions specified.

2. Unless manufacturer recommends larger conductors, install No. 22 AWG wire if maximum distance from Controller to the reader is 250 feet, and install No. 20 AWG wire if maximum distance is 500 feet.

3. For greater distances, install "extender" or "repeater" modules recommended by manufacturer of the Controller.

4. Install minimum No. 18 AWG shielded cable to readers and keypads that draw 50 mA or more.

F. Install minimum No. 16 AWG cable from Controller to electrically powered locks. Do not exceed 500 feet of cable.

G. Install minimum No. 18 AWG ac power wire from transformer to Controller, with a maximum distance of 25 feet of cable.

3.05 INSTALLATION
A. System installation shall be in accordance with UL 294, manufacturer and related documents and references, for each type of security device installed.

B. Control Panels:

1. Connect power and signal lines to the controller.

2. Program the panel as outlined by the design and per the manufacturer’s programming guidelines.

C. Card Readers:

1. Connect all signal inputs and outputs as shown and specified.

2. Terminate input signals as required.

3. Program and address the reader as per the design package.

4. Readers shall be surface or flushed mounted and all appropriate hardware shall be provided to ensure the unit is installed in an enclosed conduit system.

3.06 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust field-assembled components and equipment installation, including connections, and to assist in field testing. Report results in writing.

B. Perform the following field tests and inspections and prepare test reports:

1. Test each circuit and component of each system. Tests shall include, but are not limited to, measurements of power supply output under maximum load, signal loop resistance, and leakage to ground where applicable.

2. Operational Test: After installation of cables and connectors, demonstrate product capability and compliance with requirements. Test each signal path for

Page 1151 of 1236 ends

SECTION 28 13 00 PHYSICAL ACCESS CONTROL SYSTEM
PHYSICAL ACCESS CONTROL SYSTEM 28 13 00 - 10 of 10
end-to-end performance from each end of all pairs installed. Remove temporary connections when tests have been satisfactorily completed.

END OF SECTION

Page 1152 of 1236 ends

SECTION 31 23 00 EXCAVATING BACKFILLING AND COMPACTING
EXCAVATING BACKFILLING AND COMPACTING 31 23 00 - 1 of 3 PART 1 GENERAL

1.01 SUMMARY
A. Excavating for footings, slabs-on-grade, trenches, pits, curbs, and paving; backfill and compaction of sub-grade, base and trenches.

B. Excavated materials shall be removed from site and costs for transportation and removal included in Bid.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Submit list and source of materials to be used in the Work.

1.04 QUALITY ASSURANCE
A. Verify that survey benchmark and intended elevations for the Work are as indicated.

B. Comply with State of California Construction Safety Orders (CAL/OSHA)

1.05 UTILITY DISCONNECTS
A. Coordinate directly with County for any utility disconnects.

B. Notify Owner 72 hours prior to any excavation.

PART 2 PRODUCTS

2.01 MATERIALS
A. General: Fill material will be subject to approval of the Geotechnical Engineer.

B. Backfill and Fill Materials: Satisfactory soil materials free of clay, rock or gravel larger than 2 inches in any dimension, debris, waste, vegetation, and other unsuitable materials.

Local and import fill should have less than 15% fines and a plasticity index (PI) of less than 20.

Page 1153 of 1236 ends

SECTION 31 23 00 EXCAVATING BACKFILLING AND COMPACTING
EXCAVATING BACKFILLING AND COMPACTING 31 23 00 - 2 of 3 C. Aggregate Base: Class 2 conforming to Caltrans Specification Section 26, maximum size 3/4 inches; compact to minimum of 95 percent.

PART 3 EXECUTION

3.01 EXAMINATION
A. Identify required lines, levels, contours, and datum locations.

B. Locate, identify, and protect utilities that remain from damage.

C. Notify utility company to remove and relocate utilities if required.

D. Protect plant life, lawns, and other features remaining as a portion of final landscaping.

E. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.

3.02 EXCAVATION AND COMPACTING
A. Saw cut all cuts into asphalt and/or concrete surfaces.

B. Excavate subsoil to accommodate building foundations, paving and site structures, construction operations, and as indicated on Drawings and/or in attached Project Geotechnical Report.

C. Cover soils stockpiles. Stockpiles shall be covered daily and covers maintained as well as perimeter erosion control.

D. Compact disturbed load-bearing soil in direct contact with foundations to original bearing capacity; perform compaction as directed by Geotechnical Engineer.

E. Support trench excavations in compliance with local codes and safety regulations.

F. Sheet Pile or shore all excavations as required.

G. Do not interfere with 45 degree bearing splay under foundations except at pile foundations or where shoring is designed to resist earth and foundation pressures without permitting any settlements of foundations, slabs, or similar structures.

H. Grade top perimeter of excavation to prevent surface water from draining into excavation.

I. Hand trim excavation. Remove loose matter.

J. Remove lumped subsoil, boulders, and rock larger than 2 inches in diameter.

K. Correct areas over-excavated as directed by Geotechnical Engineer.

L. Do not backfill trenches until tests and inspections have been made.

M. Compact to minimum of 95 percent dry density (ASTM 1557) in planted areas and a minimum of 95 percent dry density (ASTM 1557) in paved areas.

Page 1154 of 1236 ends

SECTION 31 23 00 EXCAVATING BACKFILLING AND COMPACTING
EXCAVATING BACKFILLING AND COMPACTING 31 23 00 - 3 of 3 N. Footing bottoms should be free of loose debris and should be firm and unyielding as approved by the project Geotechnical Engineer prior to placement of steel and concrete.

END OF SECTION

Page 1155 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1156 of 1236
SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL
EROSION AND SEDIMENTATION CONTROL 31 25 00 - 1 of 2
PART 1 GENERAL

1.01 SUMMARY
A. This Section describes the requirements for providing and installing temporary erosion control structures.

1.02 RELATED SECTIONS
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 QUALITY ASSURANCE
A. Reference Standards

1. California Stormwater Quality Association (CASQA) “Stormwater Best Management Practice Handbook for Construction”.

2. State Water Resources Control Board (SWRCB) standards

3. California Stormwater Quality Association “Stormwater Best Management Practice Handbook” for Construction and Industrial and Commercial Development, latest edition.

1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Data, Reports and Certifications:

1. Materials used.

2. Erosion Control Point of Contract
PART 2 PRODUCTS

2.01 MATERIALS
A. Furnish and install the following as specified herein and required to eliminate potential erosion and sedimentation during construction works.

1. Outlet structure, basins, ditches

Page 1157 of 1236 ends

SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL
EROSION AND SEDIMENTATION CONTROL 31 25 00 - 2 of 2

2. Filter fabric, and/or mesh

3. Concrete washout

4. Fiber rolls

5. Inlet protection

6. Stabilized construction entrance

7. Straw waddles
PART 3 EXECUTION

3.01 PROCEDURES.

A. Erosion and sedimentation control measures are to be installed in areas as indicated and as directed by governing regulations.

B. Erosion and sedimentation control measures shall be adjusted, relocated or new controls established for each phase of construction and for specific construction activities that may disturb soils and contribute to erosion.

END OF SECTION

Page 1158 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 1 of 11 PART 1 GENERAL

1.01 DESCRIPTION
A. This section shall cover site work concrete constructed upon the prepared subgrade and in conformance with the lines, grades, thickness, and cross sections shown. Construction shall include the following:

1. Curb, gutter, and combination curb and gutter.

2. Pedestrian Pavement: Walks and curb ramps.

3. Transformer and Emergency Generator slabs, walls, and footings.

4. Exterior retaining walls.

5. Exterior stairs and landings.

6. Light, sign and bollard foundations.

7. Site furnishings foundations.

8. Fencing and gate foundations.

9. Vehicle charging equipment foundations.

10. Accessible Parking Stalls

11. Miscellaneous exterior formed and unformed concrete.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 DESIGN REQUIREMENTS
A. Design all elements with the latest published version of applicable codes.

1.04 WEATHER LIMITATIONS
A. Placement of concrete shall be in conformance with ACI as specified under Section 03 30 00, CAST-IN-PLACE CONCRETE.

Page 1159 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 2 of 11

1.05 SELECT SUBBASE MATERIAL JOB-MIX
A. The Contractor shall retain and reimburse a testing laboratory to design a select subbase material mixture and submit a job-mix formula to the Owner’s Representative, in writing, for approval. The formula shall include the source of materials, gradation, plasticity index, liquid limit, and laboratory compaction curves indicating maximum density at optimum moisture.

1.06 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Manufacturers' Certificates and Data certifying that the following materials conform to the requirements specified.

1. Expansion joint filler

2. Hot poured sealing compound

3. Reinforcement

4. Curing materials
C. Data and Test Reports: Select subbase material.

1. Job-mix formula.

2. Source, gradation, liquid limit, plasticity index, percentage of wear, and other tests as specified and in referenced publications.

1.07 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.

The publications are referenced in the text by the basic designation only. Refer to the latest edition of all referenced Standards and codes.

B. American Association of State Highway and Transportation Officials (AASHTO):

M031MM031-07-UL ...... Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement (ASTM A615/A615M-09)
M055MM055-09-UL ...... Steel Welded Wire Reinforcement, Plain, for Concrete (ASTM A185)
M147-65-UL .................. Materials for Aggregate and Soil-Aggregate Subbase, Base and Surface Courses (R 2004)
M148-05-UL .................. Liquid Membrane-Forming Compounds for Curing Concrete (ASTM C309)
M171-05-UL .................. Sheet Materials for Curing Concrete (ASTM C171) M182-05-UL .................. Burlap Cloth Made from Jute or Kenaf and Cotton Mats

Page 1160 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 3 of 11 M213-01-UL .................. Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Type) (ASTM D1751)
M233-86-UL .................. Boiled Linseed Oil Mixer for Treatment of Portland Cement Concrete
T099-09-UL ................... Moisture-Density Relations of Soils Using a 2.5 kg. (5.5 lb) Rammer and a 305 mm (12 in.) Drop
T180-09-UL ................... Moisture-Density Relations of Soils Using a 4.54 kg (10 lb.) Rammer and a 457 mm (18 in.) Drop
C. American Society for Testing and Materials (ASTM):

C94/C94M-09 ................ Ready-Mixed Concrete
C143/C143M-09 ............ Slump of Hydraulic Cement Concrete PART 2 PRODUCTS

2.01 GENERAL
A. Concrete shall be Type C, air-entrained as specified in Section 03 30 00, CAST-INPLACE CONCRETE, with the following exceptions:

TYPE MAXIMUM SLUMP*
Curb & Gutter 75 mm (3")
Pedestrian Pavement 75 mm (3")
* For concrete to be vibrated: Slump as determined by ASTM C143.

Tolerances as established by ASTM C94.

2.02 REINFORCEMENT
A. The type, amount, and locations of steel reinforcement shall be as shown on the drawings and in the specifications.

B. Welded wire-fabric shall conform to AASHTO M55.

C. Dowels shall be plain steel bars conforming to AASHTO M31. Tie bars shall be deformed steel bars conforming to AASHTO M31.

2.03 SELECT SUBBASE (WHERE REQUIRED)
A. Subbase material shall conform to Section 31 23 00 “Excavating Backfilling and Compacting” and as shown on the Drawings.

B. Subbase material shall produce a compacted, dense-graded course, meeting the density requirement specified in these specifications and drawings.

Page 1161 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 4 of 11

2.04 FORMS
A. Use metal or wood forms that are straight and suitable in cross-section, depth, and strength to resist springing during depositing and consolidating the concrete, for the work involved.

B. Do not use forms if they vary from a straight line more than 3 mm (1/8 inch) in any 3000 mm (ten foot) long section, in either a horizontal or vertical direction.

C. Wood forms should be at least 50 mm (2 inches) thick (nominal). Wood forms shall also be free from warp, twist, loose knots, splits, or other defects. Use approved flexible or curved forms for forming radii.

2.05 CONCRETE CURING MATERIALS
A. Concrete curing materials shall conform to one of the following:

1. Burlap conforming to AASHTO M182 having a weight of 233 grams (seven ounces) or more per square meter (yard) when dry.

2. Impervious Sheeting conforming to AASHTO M171.

3. Liquid Membrane Curing Compound conforming to AASHTO M148 (ASTM C309), and shall be free of paraffin or petroleum.

2.06 EXPANSION JOINT FILLERS
A. Material shall conform to AASHTO M213.

PART 3 EXECUTION

3.01 SUBGRADE PENETRATION
A. Prepare, construct, and finish the subgrade as specified in Section 31 23 00, Excavating Backfilling and Compacting.

B. Maintain the subgrade in a smooth, compacted condition, in conformance with the required section and established grade until the succeeding operation has been accomplished.

3.02 SELECT SUBBASE (WHERE REQUIRED)
A. Mixing: Proportion the select subbase by weight or by volume in quantities so that the final approved job-mixed formula gradation, liquid limit, and plasticity index requirements will be met after subbase course has been placed and compacted. Add water in approved quantities, measured by weight or volume, in such a manner to produce a uniform blend.

B. Placing:

1. Place the mixed material on the prepared subgrade in a uniform layer to the required contour and grades, and to a loose depth not to exceed 200 mm (8

Page 1162 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 5 of 11 inches), and that when compacted, will produce a layer of the designated thickness.

2. When the designated compacted thickness exceeds 150 mm (6 inches), place the material in layers of equal thickness. Remove unsatisfactory areas and replace with satisfactory mixture, or mix the material in the area.

3. In no case will the addition of thin layers of material be added to the top layer in order to meet grade.

4. If the elevation of the top layer is 13 mm (1/2 inch) or more below the grade, excavate the top layer and replace with new material to a depth of at least 75 mm (3 inches) in compacted thickness.

C. Compaction:

1. Perform compaction with approved equipment (hand or mechanical) well suited to the material being compacted.

2. Moisten or aerate the material as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used.

3. Compact each layer to at least 95 percent or 100 percent of maximum density as determined by AASHTO T180 or AASHTO T99 respectively.

D. Smoothness Test and Thickness Control:

Test the completed subbase for grade and cross section with a straight edge.

1. The surface of each layer shall not show any deviations in excess of 10 mm (3/8 inch).

2. The completed thickness shall be within 13 mm (1/2 inch) of the thickness as shown.

E. Protection:

1. Maintain the finished subbase in a smooth and compacted condition until the concrete has been placed.

2. When Contractor's subsequent operations or adverse weather disturbs the approved compacted subbase, excavate, and reconstruct it with new material meeting the requirements herein specified, at no additional cost to the Owner.

3.03 SETTING FORMS
A. Base Support:

1. Compact the base material under the forms true to grade so that, when set, they will be uniformly supported for their entire length at the grade as shown.

2. Correct imperfections or variations in the base material grade by cutting or filling and compacting.

B. Form Setting:

Page 1163 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 6 of 11

1. Set forms sufficiently in advance of the placing of the concrete to permit the performance and approval of all operations required with and adjacent to the form lines.

2. Set forms to true line and grade and use stakes, clamps, spreaders, and braces to hold them rigidly in place so that the forms and joints are free from play or movement in any direction.

3. Forms shall conform to line and grade with an allowable tolerance of 3 mm (1/8 inch) when checked with a straightedge and shall not deviate from true line by more than 6 mm (1/4 inch) at any point.

4. Do not remove forms until removal will not result in damaged concrete or at such time to facilitate finishing.

5. Clean and oil forms each time they are used.

C. The Contractor’s Registered Professional Land Surveyor shall establish and control the alignment and the grade elevations of the forms or concrete slipforming machine operations.

1. Make necessary corrections to forms immediately before placing concrete.

2. When any form has been disturbed or any subgrade or subbase has become unstable, reset and recheck the form before placing concrete.

3.04 EQUIPMENT
A. The Owner’s Representative shall approve equipment and tools necessary for handling materials and performing all parts of the work prior to commencement of work.

B. Maintain equipment and tools in satisfactory working condition at all times.

3.05 PLACING REINFORCEMENT
A. Reinforcement shall be free from dirt, oil, rust, scale or other substances that prevent the bonding of the concrete to the reinforcement.

B. Before the concrete is placed, the Owner’s Representative shall approve the reinforcement, which shall be accurately and securely fastened in place with suitable supports and ties. The type, amount, and position of the reinforcement shall be as shown.

3.06 PLACING CONCRETE - GENERAL
A. Obtain approval of the Owner’s Representative before placing concrete.

B. Remove debris and other foreign material from between the forms before placing concrete. Obtain approval of the Owner’s Representative before placing concrete.

C. Before the concrete is placed, uniformly moisten the subgrade, base, or subbase appropriately, avoiding puddles of water.

D. Convey concrete from mixer to final place of deposit by a method which will prevent segregation or loss of ingredients. Deposit concrete so that it requires as little handling as possible.

Page 1164 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 7 of 11 E. While being placed, spade or vibrate and compact the concrete with suitable tools to prevent the formation of voids or honeycomb pockets. Vibrate concrete well against forms and along joints. Over-vibration or manipulation causing segregation will not be permitted. Place concrete continuously between joints without bulkheads.

F. Install a construction joint whenever the placing of concrete is suspended for more than 30 minutes and at the end of each day's work.

G. Workmen or construction equipment coated with foreign material shall not be permitted to walk or operate in the concrete during placement and finishing operations.

3.07 PLACING CONCRETE FOR CURB AND GUTTER, PEDESTRIAN PAVEMENT, AND

EQUIPMENT PADS
A. Place concrete in the forms in one layer of such thickness that, when compacted and finished, it will conform to the cross section as shown.

B. Deposit concrete as near to joints as possible without disturbing them but do not dump onto a joint assembly.

C. After the concrete has been placed in the forms, use a strike-off guided by the side forms to bring the surface to the proper section to be compacted.

D. Consolidate the concrete thoroughly by tamping and spading, or with approved mechanical finishing equipment.

E. Finish the surface to grade with a wood or metal float.

F. All Concrete pads and pavements shall be constructed with sufficient slope to drain properly.

3.08 PLACING CONCRETE FOR VEHICULAR PAVEMENT
A. Deposit concrete into the forms as close as possible to its final position.

B. Place concrete rapidly and continuously between construction joints.

C. Strike off concrete and thoroughly consolidate by a finishing machine, vibrating screed, or by hand-finishing.

D. Finish the surface to the elevation and crown as shown.

E. Deposit concrete as near the joints as possible without disturbing them but do not dump onto a joint assembly. Do not place adjacent lanes without approval by the Owner’s Representative.

3.09 CONCRETE FINISHING - GENERAL
A. The sequence of operations, unless otherwise indicated, shall be as follows:

1. Consolidating, floating, straight-edging, troweling, texturing, and edging of joints.

2. Maintain finishing equipment and tools in a clean and approved condition.

Page 1165 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 8 of 11

3.10 CONCRETE FINISHING CURB AND GUTTER
A. Round the edges of the gutter and top of the curb with an edging tool to a radius of 1/4 inch or as otherwise detailed.

B. Float the surfaces and finish with a smooth wood or metal float until true to grade and section and uniform in textures.

C. Finish the surfaces, while still wet, with a bristle type brush with longitudinal strokes.

D. Immediately after removing the front curb form, rub the face of the curb with a wood or concrete rubbing block and water until blemishes, form marks, and tool marks have been removed. Brush the surface, while still wet, in the same manner as the gutter and curb top.

E. Except at grade changes or curves, finished surfaces shall not vary more than 1/8 inch for gutter and 1/4 inch for top and face of curb, when tested with a 10 foot straightedge.

F. Remove and reconstruct irregularities exceeding the above for the full length between regularly scheduled joints.

G. Correct any depressions which will not drain.

H. Visible surfaces and edges of finished curb, gutter, and combination curb and gutter shall be free of blemishes, form marks, and tool marks, and shall be uniform in color, shape, and appearance.

3.11 CONCRETE FINISHING PEDESTRIAN PAVEMENT
A. Walks, Wheelchair Curb Ramps:

1. Finish the surfaces to grade and cross section with a metal float, trowled smooth and finished with a broom moistened with clear water.

2. Medium brooming shall be transverse to the line of traffic.

3. Finish all slab edges, including those at formed joints, carefully with an edger having a radius as shown on the Drawings.

4. Unless otherwise indicated, edge the transverse joints before brooming. The brooming shall eliminate the flat surface left by the surface face of the edger.

Execute the brooming so that the corrugation, thus produced, will be uniform in appearance and not more than 1/16 inch in depth.

5. The completed surface shall be uniform in color and free of surface blemishes, form marks, and tool marks. The finished surface of the pavement shall not vary more than 3/16 inch when tested with a 10 foot straightedge.

6. The thickness of the pavement shall not vary more than 1/4 inch.

7. Remove and reconstruct irregularities exceeding the above for the full length between regularly scheduled joints.

Page 1166 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 9 of 11

3.12 JOINTS - GENERAL
A. Place joints, where shown, conforming to the details as shown, and perpendicular to the finished grade of the concrete surface.

B. Joints shall be straight and continuous from edge to edge of the pavement.

3.13 EXPANSION JOINTS
A. Use a preformed expansion joint filler material of the thickness as shown to form expansion joints.

B. Material shall extend the full depth of concrete, cut and shaped to the cross section as shown, except that top edges of joint filler shall be below the finished concrete surface where shown to allow for sealing.

C. Anchor with approved devices to prevent displacing during placing and finishing operations.

D. Round the edges of joints with an edging tool.

E. Form expansion joints as follows:

1. Without dowels, about structures and features that project through, into, or against any site work concrete construction.

2. Using joint filler of the type, thickness, and width as shown.

3. Installed in such a manner as to form a complete, uniform separation between the structure and the site work concrete item.

3.14 CONSTRUCTION JOINTS
A. Locate longitudinal and transverse construction joints between slabs as shown.

B. Place transverse construction joints of the type shown, where indicated and whenever the placing of concrete is suspended for more than 30 minutes.

C. Use a butt-type joint with dowels in curb and gutter if the joint occurs at the location of a planned joint.

D. Use keyed joints with tiebars if the joint occurs in the middle third of the normal curb and gutter joint interval.

3.15 FORM REMOVAL
A. Forms shall remain in place at least 12 hours after the concrete has been placed.

Remove forms without injuring the concrete.

B. Do not use bars or heavy tools against the concrete in removing the forms. Promptly repair any concrete found defective after form removal.

Page 1167 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 10 of 11

3.16 CURING OF CONCRETE
A. Cure concrete by one of the following methods appropriate to the weather conditions and local construction practices, against loss of moisture, and rapid temperature changes for at least seven days from the beginning of the curing operation. Protect unhardened concrete from rain and flowing water. All equipment needed for adequate curing and protection of the concrete shall be on hand and ready to install before actual concrete placement begins. Provide protection as necessary to prevent cracking of the pavement due to temperature changes during the curing period. If any selected method of curing does not afford the proper curing and protection against concrete cracking, remove and replace the damaged pavement and employ another method of curing as directed by the Owner’s Representative.

B. Burlap Mat: Provide a minimum of two layers kept saturated with water for the curing period. Mats shall overlap each other at least 150 mm (6 inches).

C. Impervious Sheeting: Use waterproof paper, polyethylene-coated burlap, or polyethylene sheeting. Polyethylene shall be at lease 0.1 mm (4 mils) in thickness. Wet the entire exposed concrete surface with a fine spray of water and then cover with the sheeting material. Sheets shall overlap each other at least 300 mm (12 inches). Securely anchor sheeting.

D. Liquid Membrane Curing:

1. Apply pigmented membrane-forming curing compound in two coats at right angles to each other at a rate of 5 m2/L (200 square feet per gallon) for both coats.

2. Do not allow the concrete to dry before the application of the membrane.

3. Cure joints designated to be sealed by inserting moistened paper or fiber rope or covering with waterproof paper prior to application of the curing compound, in a manner to prevent the curing compound entering the joint.

4. Immediately re-spray any area covered with curing compound and damaged during the curing period.

3.17 CLEANING
A. After completion of the curing period:

1. Remove the curing material (other than liquid membrane).

2. Sweep the concrete clean.

3. After removal of all foreign matter from the joints, seal joints as herein specified.

4. Clean the entire concrete of all debris and construction equipment as soon as curing and sealing of joints has been completed.

3.18 PROTECTION
A. The contractor shall protect the concrete against all damage prior to final acceptance by the Owner. Remove concrete containing excessive cracking, fractures, spalling, or other defects and reconstruct the entire section between regularly scheduled joints, when

Page 1168 of 1236 ends

SECTION 32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS 32 05 23 - 11 of 11 directed by the Owner’s Representative, and at no additional cost to the Owner. Exclude traffic from vehicular pavement until the concrete is at least seven days old, or for a longer period of time if so directed by the Owner’s Representative.

3.19 FINAL CLEAN-UP
A. Remove all debris, rubbish and excess material from the site.

END OF SECTION

Page 1169 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1170 of 1236
SECTION 32 12 16 ASPHALT PAVING
ASPHALT PAVING 32 12 16 - 1 of 5
PART 1 GENERAL

1.01 DESCRIPTION
A. This work shall cover the composition, mixing, construction upon the prepared subgrade, and the protection of hot asphalt concrete pavement. The hot asphalt concrete pavement shall consist of an aggregate or asphalt base course and asphalt surface course constructed in conformity with the lines, grades, thickness, and cross sections as shown.

Each course shall be constructed to the depth, section, or elevation required by the drawings and shall be rolled, finished, and approved before the placement of the next course.

B. This Section includes specifications for constructing new asphalt concrete wearing surface Type A, 1/2-inch maximum with medium grading.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 ALIGNMENT AND GRADE CONTROL
A. The Contractor’s Registered Professional Land Surveyor shall establish and control the pavement (aggregate or asphalt base course and asphalt surface course) alignments, grades, elevations, and cross sections as shown on the Drawings.

1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Data and Test Reports:

1. Aggregate Base Course: Sources, gradation, liquid limit, plasticity index, percentage of wear, and other tests required by Section 39 of Caltrans Standard Specifications (CTSS).

2. Asphalt Base/Surface Course: Aggregate source, gradation, soundness loss, percentage of wear, and other tests required by Section 39 of CTSS.

3. Job-mix formula.

C. Certifications:

1. Asphalt prime and tack coat material certificate of conformance to Section 39 of CTSS requirements.

Page 1171 of 1236 ends

SECTION 32 12 16 ASPHALT PAVING
ASPHALT PAVING 32 12 16 - 2 of 5

2. Asphalt cement certificate of conformance to CTSS requirements.

3. Job-mix certification - Submit plant mix certification that mix equals or exceeds Section 39 of CTSS.

4. Prior to starting construction, the Contractor shall submit the asphalt concrete mix design including the amount of asphalt binder to be mixed with the dry aggregate to the Engineer for approval. No resurfacing work will be allowed prior to the approval of the mix design. Asphalt concrete mix design shall conform to Section 39 of CTSS.

5. The Contractor shall submit electronic copies of manufacturer’s literature, specifications, applications and installations for filler and/or sealer material to the Owner’s Representative for approval at least five (5) calendar days in advance of performing the filling and/or sealing work.

1.05 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.

The publications are referenced in the text by the basic designation only. Refer to the latest edition of all referenced Standards and codes.

B. State of California Department of Transportation (CalTrans):

1. Standard Specifications (CTSS)
PART 2 PRODUCTS

2.01 GENERAL
A. Aggregate base, Asphaltic base and asphalt concrete materials shall conform to the requirements of the following and other appropriate sections of the latest version of Section 39 of CTSS, including amendments, addenda and errata. Where the term "Engineer" is referenced in Section 39 of CTSS, it shall mean the Owner’s Representative.

2.02 MATERIALS
A. Asphalt: In accordance with the requirements of Section 39-2.01 of CTSS, except that asphalt shall be either PG 64-10 or AR-4000.

B. Aggregate: In accordance with the requirements of Section 39-2.02 of CTSS, except that aggregate grading shall be as follows:

Limits of
Proposed Operating Contract
Sieve Sizes Gradation Range Compliance
3/4" ---------- 100 100
1/2" ---------- 95-100 89-100
3/8" ---------- 80-95 75-100
No. 4 59-66 X+5 X+8

Page 1172 of 1236 ends

SECTION 32 12 16 ASPHALT PAVING
ASPHALT PAVING 32 12 16 - 3 of 5
No. 8 43-49 X+5 X+8
No. 30 22-27 X+5 X+8
No. 200 ---------- 3-8 0-11
C. Minimum Durability Index: When tested in accordance with Caltrans Test Method 229 shall be 50.

D. Tack coat in accordance with Section 39 of CTSS.

2.03 EQUIPMENT
A. Spreading Equipment: In accordance with the requirements of Section 39 of CTSS.

B. Compacting Equipment: In accordance with the requirements of Section 9 of CTSS.

PART 3 EXECUTION

3.01 GENERAL
A. The Asphalt Concrete Paving equipment, weather limitations, job-mix formula, mixing, construction methods, compaction, finishing, tolerance, and protection shall conform to the requirements of the appropriate sections of Section 39 of CTSS for the type of material specified.

3.02 MIXING ASPHALTIC CONCRETE MATERIALS
A. Provide hot plant-mixed asphaltic concrete paving materials.

1. Temperature leaving the plant: 143 degrees C (290 degrees F) minimum, 160 degrees C (320 degrees F) maximum.

2. Temperature at time of placing: 138 degrees C (280 degrees F) minimum.

3.03 SUBGRADE
A. Shape to line and grade and compact with self-propelled rollers.

B. All depressions that develop under rolling shall be filled with acceptable material and the area re-rolled.

C. Soft areas shall be removed and filled with acceptable materials and the area re-rolled.

D. Should the subgrade become rutted or displaced prior to the placing of the subbase, it shall be reworked to bring to line and grade.

E. Proof-roll the subgrade with maximum 50 ton gross weight dump truck as directed by Owner’s Representative. If pumping, pushing, or other movement is observed, rework the area to provide a stable and compacted subgrade.

Page 1173 of 1236 ends

SECTION 32 12 16 ASPHALT PAVING
ASPHALT PAVING 32 12 16 - 4 of 5

3.04 BASE COURSES
A. Base:

1. Spread and compact to the thickness shown on the drawings.

2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller.

3. After completion of the base rolling there shall be no hauling over the base other than the delivery of material for the top course.

C. Thickness tolerance: Provide the compacted thicknesses shown on the Drawings within a tolerance of minus 0.0mm (0.0") to plus 12.7mm (0.5").

D. Smoothness tolerance: Provide the lines and grades shown on the Drawings within a tolerance of 5mm in 3m (3/16 inch in ten feet).

E. Moisture content: Use only the amount of moisture needed to achieve the specified compaction.

3.05 PLACEMENT OF ASPHALTIC CONCRETE PAVING
A. Remove all loose materials from the compacted base.

B. Apply the specified prime coat, and tack coat where required, and allow to dry in accordance with the manufacturer’s recommendations as approved by the Owner.

C. Receipt of asphaltic concrete materials:

1. Do not accept material unless it is covered with a tarpaulin until unloaded, and unless the material has a temperature of not less than 130 degrees C (280 degrees F).

2. Do not commence placement of asphaltic concrete materials when the atmospheric temperature is below 10 degrees C (50 degrees F), not during fog, rain, or other unsuitable conditions.

D. Spreading:

1. Spread material in a manner that requires the least handling.

2. Where thickness of finished paving will be 76mm (3") or less, spread in one layer.

E. Rolling:

1. After the material has been spread to the proper depth, roll until the surface is hard, smooth, unyielding, and true to the thickness and elevations shown own the drawings.

2. Roll in at least two directions until no roller marks are visible.

3. Finished paving smoothness tolerance:
a. No depressions which will retain standing water.

Page 1174 of 1236 ends

SECTION 32 12 16 ASPHALT PAVING
ASPHALT PAVING 32 12 16 - 5 of 5
b. No deviation greater than 3mm in 1.8m (1/8" in six feet).

3.06 APPLICATION OF SEAL COAT
A. Prepare the surfaces, mix the seal coat material, and apply in accordance with the manufacturer’s recommendations as approved by the Owner.

B. Apply one coat of the specified sealer.

C. Achieve a finished surface seal which, when dry and thoroughly set, is smooth, tough, resilient, of uniform black color, and free from coarse textured areas, lap marks, ridges, and other surface irregularities.

3.07 PROTECTION
A. Protect the asphaltic concrete paved areas from traffic until the sealer is set and cured and does not pick up under foot or wheeled traffic.

3.08 FINAL CLEAN-UP
A. Remove all debris, rubbish, and excess material from the work area.

END OF SECTION

Page 1175 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1176 of 1236
SECTION 32 17 13 WHEEL STOPS
WHEEL STOPS 32 17 13- 1 of 2
PART 1 GENERAL

1.01 DESCRIPTION
A. Section includes specifications for precast concrete wheel stops for vehicular parking stalls in parking structures and parking lots as indicated.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCE STANDARDS
A. State of California, Department of Transportation Caltrans, Standard Specifications (CTSS)

1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Submit manufacturers' product data of precast stops and epoxy adhesive for approval.

1.05 QUALITY ASSURANCE:

A. Precast wheel stops shall be manufactured for the intended purpose by a company or firm specializing in the manufacture of precast concrete parking appurtenances.

PART 2 PRODUCTS

2.01 MATERIALS
A. Wheel Stops: Precast, 3.5% minimum air-entrained concrete; 4000 psi minimum compressive strength. Each stop shall be reinforced with two No. 4 deformed steel reinforcing bars, minimum. Provide chamfered corners and drainage slots on underside, and provide holes for dowel-anchoring to substrate. Unless indicated otherwise, provide stops of half octagonal configuration and 30-inch length.

B. Adhesive for Anchoring Stops to Concrete Slabs, At-Grade Concrete Pavements, and AtGrade Asphalt Pavements: Epoxy adhesive manufactured for the purpose, similar and equal to the adhesives specified in Caltrans Standard Specifications, Section 95-2.04 or 95-2.05.

Page 1177 of 1236 ends

SECTION 32 17 13 WHEEL STOPS
WHEEL STOPS 32 17 13- 2 of 2
C. Adhesive for Bonding Dowel to Wheel Stop: As proposed by Contractor and approved by the Engineer, suitable for application.

D. Steel Bars for Installation: Galvanized 5/8” diameter steel dowels or galvanized PART 3 EXECUTION

3.1 INSTALLATION
A. Securely attach wheel stops into at-grade concrete and at-grade asphalt pavement with not less than two galvanized steel dowels embedded in holes cast into wheel stops.

Firmly bond each dowel to wheel stop and to pavement.

B. At concrete pavement, drill holes in pavement for dowels.

END OF SECTION

Page 1178 of 1236 ends

SECTION 32 17 23 PAVEMENT MARKINGS
PAVEMENT MARKINGS 32 17 23 - 1 of 3
PART 1 GENERAL

1.01 DESCRIPTION
A. This work shall consist of furnishing and applying paint areas restricted to accessible stalls, crosswalks, energy stalls, and other detail pavement markings, in accordance with the details as shown or as prescribed by the Owner’s Representative. Conform to the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the U.S. Department of Transportation, Federal Highway Administration, CBC 2016, 11B and ADAAG 2010 for details not shown.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples
B. Furnish Manufacturer's Certificates and Data certifying that the following materials conform to the requirements specified:

1. Paint.

1.04 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.

The publications are referenced in the text by the basic designation only.

B. Federal Specifications (Fed. Spec.):

TT-B-1325C .................. Beads (Glass Spheres); Retro-Reflective TT-P-1952D .................. Paint, Traffic Black, and Airfield Marking, Waterborne C. Master Painters Institute (MPI):

Approved Product List – 2019

Page 1179 of 1236 ends

SECTION 32 17 23 PAVEMENT MARKINGS
PAVEMENT MARKINGS 32 17 23 - 2 of 3
PART 2 PRODUCTS

2.01 PAINT
A. Paint for marking pavement (parking lot and zone marking) shall conform to MPI No. 97, color as shown. Paint for obliterating existing markings shall conform to Fed. Spec.

TT-P-1952D. Paint shall be in containers of at least 5 gallons. A certificate shall accompany each batch of paint stating compliance with the applicable publication.

2.02 PAINT APPLICATOR
A. Apply all marking by approved mechanical equipment. The equipment shall provide constant agitation of paint and travel at controlled speeds. Synchronize one or more paint "guns" to automatically begin and cut off paint flow in the case of skip lines. The equipment shall have manual control to apply continuous lines of varying length and marking widths as shown. Provide pneumatic spray guns for hand application of paint in areas where a mobile paint applicator cannot be used. If the equipment does not have a glass bead dispenser, use a separate piece of equipment. An experienced technician that is thoroughly familiar with equipment, materials, and marking layouts shall control all painting equipment and operations.

PART 3 EXECUTION

3.01 SURFACE PREPARATION
A. Allow new pavement surfaces to cure for a period of not less than 14 days before application of marking materials.

B. Thoroughly clean all surfaces to be marked before application of paint. Remove dust, dirt, and other granular surface deposits by sweeping, blowing with compressed air, rinsing with water, or a combination of these methods. Completely remove rubber deposits, existing paint markings, and other coatings adhering to the pavement with scrapers, wire brushings, sandblasting, mechanical abrasion, or approved chemicals as directed by the Owner’s Representative. The application of paint conforming to Fed. Spec. TT-P-1952D is an option to removal of existing paint markings on asphalt pavement. Apply the black paint in as many coats as necessary to completely obliterate the existing markings.

Where oil or grease are present on old pavements to be marked, scrub affected areas with several applications of trisodium phosphate solution or other approved detergent or degreaser, and rinse thoroughly after each application. After cleaning, seal oil-soaked areas with cut shellac to prevent bleeding through the new paint. Pavement marking shall follow as closely as practicable after the surface has been cleaned and dried, but do not begin any marking until the Owner’s Representative has inspected the surface and gives permission to proceed. The Contractor shall establish control points for marking and provide templates to control paint application by type and color at necessary intervals.

The Contractor is responsible to preserve and apply marking in conformance with the established control points.

3.02 APPLICATION
A. Apply uniformly painted and reflective pavement marking of required color(s), length, and width with true, sharp edges and ends on properly cured, prepared, and dried surfaces in conformance with the details as shown and established control points. The length and width of lines shall conform within a tolerance of plus or minus 3 inches and plus or minus

Page 1180 of 1236 ends

SECTION 32 17 23 PAVEMENT MARKINGS
PAVEMENT MARKINGS 32 17 23 - 3 of 3
1/8 inch, respectively, in the case of skip markings. The length of intervals shall not exceed the line length tolerance. Temperature of the surface to be painted and the atmosphere shall be above 50 degrees F and less than 95 degrees F. Apply the paint at a wet film thickness of 0.015 inch. Disperse reflective glass beads evenly on the wet paint at a rate of 6 pounds per gallon of paint. Apply paint in one coat. At the direction of the Owner’s Representative, markings showing light spots may receive additional coats. The maximum drying time requirements of the paint specifications will be strictly enforced, to prevent undue softening of asphalt, and pick-up, displacement, or discoloration by tires of traffic. If there is a deficiency in drying of the marking, discontinue paint operations until cause of the slow drying is determined and corrected. Remove and replace marking that is applied at less than minimum material rates; deviates from true alignment; exceeds stipulated length and width tolerances; or shows light spots, faulty distribution of beads, smears, or other deficiencies or irregularities. Use carefully controlled sand blasting, approved grinding equipment, or other approved method to remove marking so that the surface to which the marking was applied will not be damaged.

3.03 PROTECTION
A. Conduct operations in such a manner that necessary traffic can move without hindrance.

Protect the newly painted markings so that, insofar as possible, the tires of passing vehicles will not pick up paint. Place warning signs at the beginning of the wet line, and at points well in advance of the marking equipment for alerting approaching traffic from both directions. Place small flags or other similarly effective small objects near freshly applied markings at frequent intervals to reduce crossing by traffic. Efface and replace damaged portions of markings at no additional cost to the Owner.

3.04 DETAIL PAVEMENT MARKING
A. Use Detail Pavement Markings, exclusive of actual traffic lane marking, at exit and entrance islands and turnouts, on curbs, at crosswalks, at parking bays, and at such other locations as shown. Show the International Accessibility Symbol at indicated parking spaces. Color shall be as shown. Apply paint for the symbol using a suitable template that will provide a pavement marking with true, sharp edges and ends. Place detail pavement markings of the color(s), width(s) and length(s), and design pattern at the locations shown.

3.05 FINAL CLEAN-UP
A. Remove all debris, rubbish and excess material from the site.

END OF SECTION

Page 1181 of 1236 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1182 of 1236
SECTION 32 17 26 CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE 32 17 26 - 1 of 6 PART 1 GENERAL

1.01 SUMMARY
A. This Section specifies furnishing and installing Cast In Place Detectable/Tactile Warning Surface Tiles where indicated. Not recommended for asphalt applications.

1.02 RELATED SECTIONS: Section(s) related to this section include:

A. Drawings All Sections listed in the Table of Contents are a Condition of this Section.

1.03 SUBMITTALS
A. Product Data: Submit manufacturer’s literature describing products, installation procedures and routine maintenance.

B. Samples for Verification Purposes: Submit two (2) tile samples minimum 12”x12” of the kind proposed for use.

C. Shop drawings are required for products specified showing fabrication details, composite structural system, tile surface profile, sound on cane contact amplification feature, plans of tile placement including joints, and material to be used as well as outlining installation materials and procedure.

D. Material Test Reports: Submit complete test reports from qualified accredited independent testing laboratories to qualify that materials proposed for use are in compliance with requirements and meet or exceed the properties indicated on the specifications. All tests shall be conducted on a Cast In Place Detectable/Tactile Warning Surface Tile system as certified by a qualified independent testing laboratory.

E. Maintenance Instructions: Submit copies of manufacturer’s specified installation and maintenance practices for each type of Detectable Warning Surface Tile and accessory as required.

1.04 QUALITY ASSURANCE
A. Provide Cast In Place Detectable/Tactile Warning Surface Tiles and accessories as produced by a single manufacturer with a minimum of five (5) years’ experience in the manufacturing of Cast In Place Detectable/Tactile Warning Surface Tiles.

B. Installer’s Qualifications: Engage an experienced Installer certified in writing by Cast In Place Detectable/Tactile Warning Surface Tile manufacturer as qualified for installation, who has successfully completed installations similar in material, design, and extent to that indicated for Project.

C. Americans with Disabilities Act (ADA): Provide Surface Applied Detectable/Tactile Warning Surface Tiles which comply with the detectable warnings on walking surfaces section of the Americans with Disabilities Act (Title III Regulations, 28 CFR Part 36 ADA STANDARDS FOR ACCESSIBLE DESIGN, Appendix A, Section 4.29.2 DETECTABLE WARNINGS ON WALKING SURFACES).

D. California Code of Regulations (CCR): Provide only approved DSAAC detectable warning products as provided in the California Code of Regulations (CCR) Title 24, Chapter 2,

Page 1183 of 1236 ends

SECTION 32 17 26 CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE 32 17 26 - 2 of 6 Section 202 definition of ”Detectable Warning”. Section 11B-247 and 11B-705 “Detectable Warnings And Detectable Directional Texture”
E. Vitrified Polymer Composite (VPC) Cast in Place Warning tiles shall include continuous strand woven fiberglass sheet matrix embedded within an epoxy polymer composition with a ultra-violet coating employing aluminum oxide particles in the truncated domes. The tile shall incorporate an in-line pattern of truncated domes measuring nominal 0.2” height, 0.9” base diameter, and 0.45” top diameter, spaced center-to-center 2.35” to 2.40 as measured “In Line”. For wheelchair safety the field area shall consist of a non-slip surface with a minimum of 40 - 90° raised points 0.045” high, per square inch.

1. Dimensions: Cast In Place Detectable/Tactile Warning Surface Tiles shall be held within the following dimensions and tolerances:

Length and Width: 36” x 60"
Nominal Depth: 1.375 (1-3/8”) (+/-) 5% max.

Face Thickness: 0.1875 (1 3/8”) (+/-) 5% max.

Warpage of Edge: 0.5% max.

Embedment Flange Spacing: shall be no greater than 3.1"

2. Water Absorption of Tile when tested by ASTM D 570-98 not to exceed 0.05%.

3. Slip Resistance of Tile when tested by ASTM C 1028-96 the combined Wet and Dry Static Co-Efficients of Friction not to be less than 0.80 on top of domes and field area.

4. Compressive Strength of Tile when tested by ASTM D 695-02a not to be less than 28,000 psi.

5. Tensile Strength of Tile when tested by ASTM D 638-03 not to be less than 19,000 psi.

6. Flexural Strength of Tile when tested by ASTM D 790-03 not to be less than 25,000 psi.

7. Chemical Stain Resistance of Tile when tested by ASTM D 543-95 (re approved 2001) to withstand without discoloration or staining - 10% hydrochloric acid, urine, saturated calcium chloride, black stamp pad ink, chewing gum, red aerosol paint, 10% ammonium hydroxide, 1% soap solution, turpentine, Urea 5%, diesel fuel and motor oil.

8. Abrasive Wear of Tile when tested by BYK - Gardner Tester ASTM D 2486-00 with reciprocating linear motion of 37± cycles per minute over a 10” travel. The abrasive medium, a 40 grit Norton Metallite sand paper, to be fixed and leveled to a holder. The combined mass of the sled, weight and wood block is to be

3.2 lb. Average wear depth shall not exceed 0.060 after 1000 abrasion cycles when measured on the top surface of the dome representing the average of three measurement locations per sample.

9. Resistance to Wear of Unglazed Ceramic Tile by Taber Abrasion per ASTM C501-84 (re approved 2002) shall not be less than 500.

10. Gardner Impact to Geometry "GE" of the standard when tested by ASTM D 5420- 04 to have a mean failure energy expressed as a function of specimen thickness of

Page 1184 of 1236 ends

SECTION 32 17 26 CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE 32 17 26 - 3 of 6 not less than 550 in. lbf/in. A failure is noted when a crack is visible on either surface or when any brittle splitting is observed on the bottom plaque in the specimen.

11. Accelerated Weathering of Tile when tested by ASTM G 155-05a for 3000 hours shall exhibit the following result – ΔE <4.5, as well as no deterioration, fading or chalking of surface of tile color No 33538

12. Accelerated Aging and Freeze Thaw Test of Tile and Adhesive System when tested to ASTM D 1037-99 shall show no evidence of cracking, delamination, warpage, checking, blistering, color change, loosening of tiles or other detrimental defects.

13. Salt and Spray Performance of Tile when tested to ASTM B 117-03 not to show any deterioration or other defects after 200 hours of exposure.

14. AASHTO HB-17 single wheel HS20-44 loading “Standard Specifications for Highways and Bridges”. The Cast In Place Tile shall be mounted on a concrete platform with a ½” airspace at the underside of the tile top plate then subjected to the specified maximum load of 10,400 lbs., corresponding to an 8000 lb individual wheel load and a 30% impact factor. The tile shall exhibit no visible damage at the maximum load of 10,400 lbs.

15. Embedment flange spacing shall be no greater than 3.1” center to center spacing as illustrated on the product Cast In Place drawing.

1.05 DELIVERY, STORAGE AND HANDLING
A. Cast In Place Detectable/Tactile Warning Surface Tiles shall be suitably packaged or crated to prevent damage in shipment or handling. Finished surfaces shall be protected by sturdy plastic wrappings to protect tile from concrete residue during installation and tile type shall be identified by part number.

B. Cast In Place Detectable/Tactile Warning Surface Tiles shall be delivered to location at building site for storage prior to installation.

1.06 SITE CONDITIONS
A. Environmental Conditions and Protection: Maintain minimum temperature of 40°F in spaces to receive Cast In Place Detectable/Tactile Warning Surface Tiles for at least 24 hours prior to installation, during installation, and for not less than 24 hours after installation.

B. The use of water for work, cleaning or dust control, etc. shall be contained and controlled and shall not be allowed to come into contact with the general public. Provide barricades or screens to protect the general public.

1.07 GUARANTEE
A. Cast In Place Detectable/Tactile Warning Surface Tiles shall be guaranteed in writing for a period of five (5) years from date of final completion. The guarantee includes defective work, breakage, deformation, fading and loosening of tiles.

PART 2 PRODUCTS

Page 1185 of 1236 ends

SECTION 32 17 26 CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE 32 17 26 - 4 of 6

2.01 MANUFACTURERS
A. Basis-Of-Design Manufacturer: ”Armor-Tile” as manufactured by Engineered Plastics Inc., Tel: 800-682-2525, or approved equal.

B. Product: The Vitrified Polymer Composite (VPC) Cast In Place Detectable/Tactile Warning Surface Tile.

C. Color: Yellow conforming to Federal Color No. 33538. Color shall be homogeneous throughout the tile.

PART 3 EXECUTION

3.01 INSTALLATION
A. During Cast In Place Detectable/Tactile Warning Surface Tile installation procedures, ensure adequate safety guidelines are in place and that they are in accordance with the applicable industry and government standards.

B. Prior to placement of the Cast In Place Detectable/Tactile Warning Surface Tile system, review manufacturer and contract drawings with the Contractor prior to the construction and refer any and all discrepancies to the Engineer.

C. The specifications of the structural embedment flange system and related materials shall be in strict accordance with the contract documents and the guidelines set by their respective manufacturers. Not recommended for asphalt applications.

D. The physical characteristics of the concrete shall be consistent with the contract specifications while maintaining a slump range of 4 - 7 to permit solid placement of the Cast In Place Detectable/Tactile Warning Surface Tile system. An overly wet mix will cause the tile to float.

Under these conditions, suitable weights such as 2 concrete blocks or sandbags (25 lb) shall be placed on each tile.

E. The concrete pouring and finishing operations require typical mason’s tools, however, a 4’ long level with electronic slope readout, 25 lb. weights, and a large non-marring rubber mallet are specific to the installation of the Cast In Place Detectable/Tactile Warning Surface Tile system. A vibrating mechanism such as that manufactured by Vibco can be employed, if desired. The vibrating unit should be fixed to a soft base such as wood, at least 1 foot square.

F. The factory-installed plastic sheeting must remain in place during the entire installation process to prevent the splashing of concrete onto the finished surface of the tile.

G. When preparing to set the tile, it is important that no concrete be removed in the area to accept the tile. It is imperative that the installation technique eliminates any air voids under the tile. Holes in the tile perimeter allow air to escape during the installation process.

Concrete will flow through the large holes in each embedment flange on the underside of the tile. This will lock the tile solidly into the cured concrete.

H. The concrete shall be poured and finished true and smooth to the required dimensions and slope prior to the tile placement. Immediately after finishing concrete, the electronic level should be used to check that the required slope is achieved. The tile shall be placed true and square to the curb edge in accordance with the contract drawings. The Cast In Place

Page 1186 of 1236 ends

SECTION 32 17 26 CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE 32 17 26 - 5 of 6 Detectable/Tactile Warning Surface Tiles shall be tamped (or vibrated) into the fresh concrete to ensure that the field level of the tile is flush to the adjacent concrete surface. The embedment process should not be accomplished by stepping on the tile as this may cause uneven setting which can result in air voids under the tile surface. The contract drawings indicate that the tile field level (base of truncated dome) is flush to adjacent surfaces to permit proper water drainage and eliminate tripping hazards between adjacent finishes.

I. In cold weather climates it is recommended that the Cast In Place Detectable/Tactile Warning Surface Tiles be set deeper such that the top of domes are level to the adjacent concrete on the top and sides of ramp and that the base of domes to allow water drainage. This installation will reduce the possibility of damage due to snow clearing operations.

J. Immediately after placement, the tile elevation is to be checked to adjacent concrete. The elevation and slope should be set consistent with contract drawings to permit water drainage to curb as the design dictates. Ensure that the field surface of the tile is flush with the surrounding concrete and back of curb so that no ponding is possible on the tile at the back side of curb.

K. While concrete is workable, a 3/8" radius edging tool shall be used to create a finished edge of concrete, then a steel trowel shall be used to finish the concrete around the tile’s perimeter, flush to the field level of the tile.

L. During and after the tile installation and the concrete curing stage, it is imperative that there is no walking, leaning or external forces placed on the tile that may rock the tile causing a void between the underside of tile and concrete.

M. Following tile placement, review installation tolerances to contract drawings and adjust tile before the concrete sets. Two suitable weights of 25 lb each may be required to be placed on each tile as necessary to ensure solid contact of the underside of tile to concrete.

N. Following the concrete curing stage, protective plastic wrap is to be removed from the tile surface by cutting the plastic with a sharp knife, tight to the concrete/tile interface. If concrete bled under the plastic, a soft brass wire brush will clean the residue without damage to the tile surface.

O. If desired, individual tiles can be bolted together using ¼ inch or equivalent hardware. This can help to ensure that adjacent tiles are flush to each other during the installation process.

Tape or caulking can be placed on the underside of the bolted butt joint to ensure that concrete does not rise up between the tiles during installation. Any protective plastic wrap which was peeled back to facilitate bolting or cutting, should be replaced and taped to ensure that the tile surface remains free of concrete during the installation process.

P. Tiles can be cut to custom sizes, or to make a radius, using a continuous rim diamond blade in a circular saw or mini-grinder. Use of a straightedge to guide the cut is advisable where appropriate.

Q. Any sound-amplifying plates on the underside of the tile, which are dislodged during handling or cutting, should be replaced and secured with construction adhesive. The air gap created between these plates and the bottom of the tile is important in preserving the sound on cane audible properties of the Armor-Tile system as required in various jurisdictions.

3.02 CLEANING, PROTECTING AND MAINTENANCE
A. Protect tiles against damage during construction period to comply with Tactile Tile

Page 1187 of 1236 ends

SECTION 32 17 26 CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE CAST-IN-PLACE DETECTABLE/TACTILE WARNING SURFACE 32 17 26 - 6 of 6 manufacturer’s specification.

B. Protect tiles against damage from rolling loads following installation by covering with plywood or hardwood.

C. Clean Tactile Tiles not more than four days prior to date scheduled for inspection intended to establish date of substantial completion in each area of project. Clean Tactile Tile by method specified by Tactile Tile manufacturer.

D. Comply with manufacturers maintenance manual for cleaning and maintaining tile surface and it is recommended to perform annual inspections for safety and tile integrity.

END OF SECTION

Page 1188 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 1 of 26
***************************ATTENTION: This section contains multiple sections************************************* SECTION 33 05 31.11 - POLYVINYL CHLORIDE (PVC) GRAVITY PIPE PART 1 – GENERAL

1. 01 THE REQUIREMENT:

The Contractor shall furnish and install PVC pipe and all appurtenances as specified, complete and in place, as shown on the Plans, as specified in this Section and Section 33 31 00 - Sanitary Sewerage Piping and Section 33 31 16 - Sanitary Sewer Gravity Service Laterals.

1.02 RELATED WORK SPECIFIED ELSEWHERE:

A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS:

A. Commercial Standards:

AWWA C900-07: Standard for Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In. Through 12 In. (100 mm through 300 mm), for Water Transmission and Distribution
AWWA C905-08: Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 In.

Through 48 In. (350 mm Through 1,200 mm), for Water Transmission and Distribution ASTM D 1784: Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds.

ASTM D 2241: Specification for Poly (Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDRSeries) ASTM D 2321: Practice for Underground Installation of Thermoplastic Sewer Pipe for Sewers and Other Gravity-Flow Applications
ASTM D 3034: Specification for Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM F 477: Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F 1674: Test Method for Joint Restraint Products

Page 1189 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 2 of 26

1.04 QUALITY ASSURANCE:

A. Except as modified in this Section, all materials used in the manufacture or installation of the pipe shall be tested in accordance with the requirements of the referenced standards.

B. Submittals and testing shall be done in compliance with Section 33 01 30.11 - Inspection of Sewers.

PART 2 – PRODUCTS

2.01 GENERAL:

All PVC pipe shall be continuously and permanently marked with the manufacturer's name, pipe size and pressure rating in psi.

2.02 PIPE:

A. All PVC pipe shall be joined by compression, solvent-welded, thermo-fusion welded or mechanical restrained joints as shown on the Plans.

B. Polyvinyl chloride pipe (PVC) shall conform to the requirements of ASTM D 3034, SDR26, or AWWA C900 or C905, Class 100, 150, 165, 200, 253, or 305. Material for PVC pipe shall conform to the requirements of ASTM D 1784 for Class 12454-B or 12454-C as defined therein.

C. Flexible rubber rings for compression type joints for PVC pipe and fittings shall conform to the requirements of ASTM F 477.

D. All sun-faded pipe or pipe with noticeable surface defects will be rejected and shall be replaced by the Contractor.

2.03 COUPLINGS AND FITTINGS:

A. Couplings shall be as listed in the Approved Materials List.

B. All fittings for PVC pipe shall conform to the requirements of ASTM D 2241. The ring groove and gasket ring shall be compatible with PVC pipe ends.

C. The strength class of fittings shall be no less than the strength class of any adjoining pipe.

D. PVC fittings shall, at a minimum, conform to the requirements of ASTM D 3034 as they apply to type SDR-26 PVC Sewer Pipe using an Elastomeric Gasket Joint in a bell and spigot assembly system. Rubber sealing gaskets shall meet the requirements of ASTM F 477.

E. All PVC pipe entering or leaving a concrete structure shall have a rubber sealing gasket, as supplied by the pipe manufacturer, firmly seated perpendicular to the pipe axis, around the pipe banded and cast into the structure base or near the structure wall center as a water stop. Said water stop may also consist of a manhole coupling with rubber sealing rings cast into the structure base (see DWG 20-05).

Page 1190 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 3 of 26

2.04 RESTRAINED JOINTS FOR C900 PVC PIPE:

All restrained joints used in sanitary sewer applications shall meet or exceed the requirements of ASTM F 1674. All restrained joints shall be per the Approved Materials List.

PART 3 – EXECUTION

3.01 GENERAL:

A. Sewer pipelines shall be constructed in compliance with the requirements of this Section and Section 33 31 00 - Sanitary Sewerage Piping and Section 33 31 16 - Sanitary Sewer Gravity Service Laterals.

B. Work shall meet the specified requirements of these Specifications unless the requirements of the local agency having jurisdiction are greater, in which case the greater requirements shall govern.

3.02 INSTALLATION:

PVC pipe shall be installed in accordance with the requirements of ASTM D 2321; as specified herein and shown on the Plans

3.03 HORIZONTAL CURVES:

Horizontal curves shall be installed using straight pipe segments, each a minimum of five feet in length and joint deflections or fittings in accordance with the requirements of DWG 21-01, or with forced bends where the radius of the curve exceeds the minimums specified in the table below:

3.04 FIELD JOINTING:

A. Each pipe compression-type joint shall be joined with a lock-in rubber ring and a ring groove that is designed to resist displacement during pipe insertion.

B. The ring and the ring seat inside the bell shall be wiped clean before the gasket is inserted. A thin film of lubricant shall be applied to the exposed surface of the ring and to the outside of the clean pipe end. Lubricant other than that furnished with the pipe shall not be used.

C. Joints shall not be deflected either vertically or horizontally in excess of the printed recommendations of the pipe manufacturer.

END OF SECTION
*****************************************************************************************************************************

Page 1191 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 4 of 26
SECTION 33 05 19 - DUCTILE IRON PIPE (DIP)
PART 1 – GENERAL

1.01 THE REQUIREMENT:

The Contractor shall furnish and install ductile iron pipe (DIP) and all appurtenances as specified, complete and in place, as shown on the Plans, as specified in this Section and in Section 33 31 00 - Sanitary Sewerage Piping and Section 33 31 16 - Sanitary Sewer Gravity Service Laterals.

1.02 RELATED WORK SPECIFIED ELSEWHERE:

A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS:

A. Commercial Standards:

ANSI/AWWA C110/A21.10: Ductile-Iron and Gray-Iron Fittings, 3 in. through 48 in. for Water and Other Liquids
ANSI/AWWA C111/A21.11: Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings
ANSI/AWWA C115/A21.15: Flanged Ductile-Iron and Gray-Iron Pipe with Threaded Flanges
ANSI/AWWA C150/A21.50: Thickness Design of Ductile-Iron Pipe ANSI/AWWA C151/A21.51: Ductile-Iron Pipe, Centrifugally Cast ANSI/AWWA C153/A21.53: Ductile-Iron Compact Fittings, 3 in. through 12 in. for Water and Other Liquids
AWWA C600: Installation of Ductile-Iron Water Mains and Their Appurtenances

1.05 QUALITY ASSURANCE:

A. Except as modified in this Section, all materials used in the manufacture or installation of the pipe shall be tested in accordance with the requirements of the referenced standards.

B. Submittals and testing shall be done in compliance with Section 33 01 30.11 - Inspection of Sewers.

Page 1192 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 5 of 26
PART 2 – PRODUCTS

2.01 GENERAL:

A. Ductile-iron pipe (DIP) shall conform to the latest revision of ANSI/AWWA C150/A21.50 subject to the following supplemental requirements. The pipe shall be furnished complete with rubber gaskets, and all special fittings shall be provided as shown on the Plans.

B. Bell and spigot joints and mechanical joints are acceptable for underground applications.

As an alternative to bell and spigot joints the use of mechanical and flanged joints will be permitted for above ground applications only.

2.02 PIPE:

Ductile iron pipe shall be of the diameter indicated at a minimum Class 52 and shall be manufactured with standard bell and spigot joints in accordance with the latest revision of ANSI/AWWA C151/A21.51.

2.03 LINING AND COATING:

Pipe shall have standard asphaltic coating on the exterior and be epoxy lined on the interior with Protecto 401™ ceramic epoxy lining as manufactured by U.S. Pipe, or approved equal.

2.04 FITTINGS:

A. Fittings shall be ductile iron at a minimum of Class 52. Fittings shall conform to the latest revision of either ANSI/AWWA C110/A21.10 or ANSI/AWWA C153/A21.53. Fittings and accessories shall be furnished with either Push-on or Mechanical Type Joints in accordance with ANSI/AWWA C111/A21.11.

B. Ductile-iron pipe and fittings shall be furnished with mechanical joints, push-on joints, flanged joints, and/or restrained joints, as required. Bolted joints shall not be used for underground installations.

1. Mechanical and push-on bell and spigot joints shall conform to ANSI/AWWA C111/A21.11 and be furnished complete with all necessary accessories.

2. Flanged joints shall conform to ANSI/AWWA C115/A21.15.

3. Restrained joints shall be per the Approved Materials List.

PART 3 – EXECUTION

3.01 GENERAL:

A. Sewer pipelines shall be constructed in compliance with the requirements of this Section and Section 33 31 00 - Sanitary Sewerage Piping and Section 33 31 16 - Sanitary Sewer Gravity Service Laterals.

B. Work shall meet or exceed the requirements of these Specifications unless applicable requirements of an agency having jurisdiction (including the terms and conditions of an encroachment permit issued by a city or county) are greater, in which case the greater requirements shall govern.

Page 1193 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 6 of 26

3.02 INSTALLATION OF PIPE:

A. All pipe shall be installed in accordance with ANSI/AWWA C600.

3.03 RUBBER-GASKETED JOINTS:

A. Immediately before jointing pipe, the bell end of the pipe shall be thoroughly cleaned, and a clean rubber gasket, lubricated with an approved vegetable-based lubricant, shall be placed in the bell groove. The spigot end of the pipe shall be carefully cleaned and lubricated with a vegetable-based lubricant. The spigot end of the pipe section shall then be inserted into the bell of the previously laid joint and pushed into its proper position.

Tilting of the pipe to insert the spigot into the bell will not be permitted.

END OF SECTION
***************************************************************************** SECTION 31 23 16 - EXCAVATION, BEDDING AND BACKFILL
PART 1 – GENERAL

1.01 THE REQUIREMENT:

The Contractor shall provide all labor, materials, and equipment necessary to perform all excavation, bedding, backfill and grading operations required for construction of the work.

1.02 RELATED WORK SPECIFIED ELSEWHERE:

A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS:

A. Commercial Standards:

ASTM D 1556: Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
ASTM D 1557: Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kNm/m3))
ASTM D 2419: Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregates

Page 1194 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 7 of 26
ASTM D 2487: Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D 6938: Test Methods for In-Place Density and Water Content of Soil and SoilAggregate by Nuclear Methods (Shallow Depth) ASTM D 4253: Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table
ASTM D 4254 Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density

1.04 CONTRACTOR SUBMITTALS:

A. Compaction testing of bedding and backfill materials shall be required for all main sewer extensions and laterals in public streets.

B. Compaction testing of bedding and backfill for side sewer work on private property may be required at the discretion of the Inspector.

C. The required compaction testing shall be conducted under the direction of a Civil or Geotechnical Engineer licensed by the State of California. As a condition of Central San’s Final Inspection, a Certification Report indicating that compaction results meet or exceed the requirements of these Specifications shall be submitted by the engineer in responsible charge of the compaction testing with a cover letter bearing the engineer’s professional stamp.

D. Compaction testing shall be completed prior to the acceptance televising of the sewer and installation of final paving.

1.05 QUALITY ASSURANCE:

A. Where soil material is required to be compacted to a percentage of maximum density, the maximum density at optimum moisture content will be determined in accordance with ASTM D 1557. Where cohesionless, free draining soil material is required to be compacted to a percentage of relative density, the calculation of relative density will be determined in accordance with ASTM D 4253 and D 4254. Field density in-place tests will be performed in accordance with ASTM D 1556, ASTM D 6938, or by such other means acceptable to Central San. At a minimum, compaction tests shall be conducted for each 50 feet of trench and for each 2 feet of trench depth, unless otherwise specified by the agency with jurisdiction for the roadway.

B. If a first test and a subsequent re-test of the bedding or backfill show noncompliance with the density required under this Section, the Contractor shall remove and re-compact the material represented by the test/retest as necessary to ensure compliance.

C. The Contractor shall provide access in the excavation for the soil compaction testing technician or Inspector. This shall include providing site-specific safety equipment and temporary shoring to enable compaction testing at each required level within the excavation. Should the Contractor have backfilled to an elevation above that required to be tested, he shall excavate the backfill down to the necessary level for testing and provide shoring at his cost. Subsequent backfilling shall also be at the Contractor’s cost.

Page 1195 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 8 of 26
PART 2 – PRODUCTS

2.01 SUITABLE BEDDING AND BACKFILL MATERIAL:

A. Bedding and backfill material shall be selected or processed clean, free from grass, roots, brush, other vegetation, debris, refuse or other deleterious material of any kind.

B. The following types of bedding and backfill materials are designated and defined as follows:

1. Type I Bedding and Backfill Material (Class 2 Aggregate Base): Shall be newly quarried or recycled material (not mined alluvial material), and shall be certified by the quarry or recycler as complying with the provisions of Caltrans Specifications Section 26 (Class 2 Aggregate Base) for 3/4” maximum grading.

2. Type III Bedding and Backfill Material (native material from trench excavation): Shall be free from vegetable matter, debris and refuse, shall contain no concrete, stones or clods larger than 3” in any dimension and shall contain sufficient fines so that all voids will be filled when compacted, and shall be so constituted that compaction requirements can be met.

3. Select Type III Bedding and Backfill Material (native material from trench excavation):

Shall meet all requirements of the above described Type III Bedding and Backfill Material with the additional requirement that the maximum particle size shall be 3/4” in diameter.

4. Coarse Bedding Material (Drain Rock/Foundation Rock): Shall be crushed stone or gravel (not mined alluvial material), with a minimum of 95% crushed particles per CTM 205, durable and free from slaking or decomposition under action of alternate wetting and drying with minimum Durability Index of 40 per CTM 229. The material shall meet the following gradation requirements:

C. Controlled Low Strength Material shall conform to the requirements of Section 03 34 13 - Controlled Low-Strength Material (CLSM).

2.02 UNSUITABLE MATERIAL:

A. Unsuitable materials for bedding and backfill shall include soils, which when classified under ASTM D 2487 fall in the classifications of PT, OH, CH, MH, or OL. In addition, any soil that cannot be sufficiently compacted to achieve the percentage of maximum density specified for the intended use shall be considered unsuitable.

B. Chemical testing for corrosivity shall be performed for all materials proposed for use as bedding and backfill for metallic or reinforced concrete pipe. The testing shall be in accordance with the requirements of CTM 417, CTM 422 and CTM 643. Bedding and backfill materials shall be considered unsuitable when the chloride concentration exceeds 500 ppm, sulfate concentration exceeds 1,500 ppm, resistivity is less than 2,000 ohm-cm

Page 1196 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 9 of 26
or pH is less than 6.5. Testing shall be performed by a qualified laboratory approved by Central San, and the data shall be submitted to the Inspector for acceptance prior to use of the material in the work.

C. Type III materials which are too wet to be compacted to specified compaction shall not be rejected solely because they are too wet for proper compaction. The Contractor may at its option, dry these materials in accordance with Paragraph 3.8.G of this section prior to compaction. Alternatively, the Contractor may remove the Type III materials and provide imported backfill material.

D. Backfill placed within 6” of any structure or pipe shall be free of rocks or unbroken clods of earth larger than 3” in any dimension.

E. All material that is determined to be unsuitable for use as bedding and backfill or that is in excess of the amount required shall be removed immediately and disposed of properly by the Contractor.

2.03 USE OF SUITABLE BEDDING AND BACKFILL MATERIAL:

Backfill types shall be used in accordance with the following provisions:

A. Pipe zone backfill (bedding, haunching and shading), as defined under paragraph 3.6 Bedding and Backfill herein, shall be Type I Bedding and Backfill Material (Class 2 Aggregate Base) unless otherwise specified on the Plans.

B. Trench zone backfill, as defined under paragraph 3.6 Bedding and Backfill herein, for pipelines in public and private streets and other paved areas shall be Type I Bedding and Backfill Material (Class 2 Aggregate Base).

C. Trench zone backfill in future roadway or street rights-of-way or in off road locations (e.g., easements) may be Type III Bedding and Backfill Material (native trench soil) so long as specified compaction is achieved.

D. Final Backfill as defined under "Pipe and Utility Trench Backfill herein, for pipelines in public and private streets and other paved areas shall be Type I Bedding and Backfill Material (Class 2 Aggregate Base).

E. Backfill around structures, vaults, and valve boxes shall be Type I Bedding and Backfill Material (Class 2 Aggregate Base).

F. Backfill used to replace structure and pipeline trench over-excavation of wet or soft trench bottom conditions shall be Coarse Bedding and Backfill Material (Drain Rock/Foundation Rock) with a geotextile envelope (minimum one-foot overlap) around the rock to prevent migration of fines.

G. Controlled Low Strength Material may be used for pipe zone backfill and trench zone backfill whenever pre-approved in writing by Central San or shown on the Plans.

H. Trenches in landscaped or cultivated areas shall have the top 12” inches backfilled with topsoil.

2.04 FILTER FABRIC:

Filter fabric shall be as specified in Section 31 05 19 - Geosynthetics for Earthwork.

Page 1197 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 10 of 26

2.05 TRENCH DAMS, AND PIPE ANCHORS:

Trench Dams and Pipe Anchors shall be provided at the locations shown on the Plans and shall be constructed as shown in the Standard Drawings as follows:
• DWG 20-05 Trench Dams
• DWG 21-03 Pipe Anchor Detail
Trench dams shall be of the length and width dimensions shown in the detail, shall extend below finished grade as shown in the detail, and shall be constructed of controlled low strength material (CLSM) as specified in Section 03 34 13 - Controlled Low-Strength Material (CLSM).

PART 3 – EXECUTION

3.01 GENERAL:

A. Work shall meet or exceed the requirements of these Specifications unless applicable requirements of an agency having jurisdiction (including the terms and conditions of an encroachment permit issued by a city or county) are greater, in which case the greater requirements shall govern.

B. Prior to any excavation and backfill work, the Contractor shall obtain and provide Central San with copies or other evidence of acquisition thereof, all required permits for the work, including but not limited to: County and/or City encroachment permits, Central San permits, Cal OSHA Excavation Permit, and Competent Person certification.

C. Material to be used for backfill shall be laid alongside of the trench and kept trimmed so as to cause as little inconvenience as possible to public travel and the normal use of adjacent properties. However, stockpiled material shall be kept a minimum of two feet from the edge of the trench and the face of the stockpile shall be sloped as needed. Free access shall be provided to all fire hydrants, water gates, meters, and private drives.

Gutters or other drainage ways shall be kept clear unless other temporary provisions are made for maintaining drainage.

D. In advance of placing sewer pipe or structures, material within the area where such pipe or structures are to be placed, which in the opinion of the Inspector is unsuitable including, but not limited to vegetable matter, garbage, and junk piles, either on the surface or buried, shall be removed and disposed of.

E. Water to control dust resulting from grading operations, excavation, backfill, and the passage of traffic through the work area shall be applied by means that will ensure a uniform application of water with no runoff.

F. The Contractor shall remove and dispose of all excess excavated material at a suitable preferred site(s). The Contractor shall obtain all necessary fill and grading permits and a written release from property owners upon completion of use of said sites.

3.02 STRUCTURE EXCAVATION:

A. Except when specifically provided to the contrary, excavation shall include the removal of all materials of whatever nature encountered, including all obstructions of any nature that would interfere with the proper execution and completion of the work. The removal of

Page 1198 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 11 of 26
these materials shall conform to the lines and grades shown on the Plans or as directed by the Inspector Unless otherwise provided, the entire construction site shall be stripped of all vegetation and debris, and such material shall be removed from the site prior to performing any excavation or placing any fill. The Contractor shall furnish, place, and maintain all supports and shoring that may be required for the sides of the excavations, and all pumping, ditching, or other measures required for the removal or exclusion of water, including storm water, groundwater, and wastewater reaching the site of the work from any source so as to provide dry working conditions and to prevent damage to the work or adjoining property. Excavations shall be benched, sloped, shored or otherwise supported in a safe manner in accordance with applicable State safety requirements and the requirements of OSHA Safety and Health Standards for Construction (29CFR1926).

F. Excavation under structures, manholes, vaults and others: Except where otherwise specified for a particular structure or directed by the Inspector, excavation shall be carried to the grade of the bottom of the bedding. Where shown on the Plans or directed by the Inspector, areas beneath structures shall be over-excavated. The exposed surface shall be scarified to a depth of 6”, brought to optimum moisture content, and compacted to 95% relative compaction. Where over-excavation is directed by the Inspector to provide for the placement of foundation rock over wet or soft soils, scarification and recompaction shall not be performed.

3.03 TRENCH EXCAVATION:

A. Excavation for sewers shall be made only after pipe and other necessary materials are delivered on the site of the work. After such delivery, trench excavation shall proceed as rapidly as possible, and the pipe installed and the trench backfilled without undue delay.

In public street areas, excavation and pipe installation shall be coordinated to the end that a minimum of interference with traffic will result.

B. Refer to table below for required trench widths according to nominal pipe size.

C. The pipe bedding shall be given a final trim, using a laser for establishing grade, such that each pipe section when first laid will be continually in contact with the bedding along the bottom of the pipe. The Contractor shall excavate bell holes at pipe joints.

D. For trenching in existing streets, excavation and pipe installation shall be coordinated so that no more than 100 linear feet of trench shall be open at any time. Backfilling operations shall closely follow pipe installation. In new subdivisions more than 100 feet of trench may be opened if allowed by the Inspector and if the excavation is properly shored, sloped or benched. All trenches shall be fully backfilled at the end of each day or, properly shored and covered by heavy steel plates adequately braced and capable of supporting H-20 vehicle loads in those locations subject to traffic and with 1- 1/8” plywood in off road locations where it is impractical to backfill at the end of each day. Use of steel traffic plates is subject to the prior approval of the agency issuing the encroachment permit. Traffic plates shall be staked in place, with adjacent plates tack-welded together, and shall be provided with non-skid coating. Compacted cold mix asphalt shall be placed around the plate perimeter to provide a smooth transition from adjacent pavement.

Page 1199 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 12 of 26
E. Where the bottom of the trench becomes soft or is unstable due to groundwater and/or movement of construction equipment, the Contractor shall over-excavate unsuitable material to a minimum depth of 9” below the base elevation to establish a stable foundation for the bedding or to a depth as otherwise directed by the Inspector.

Geotextile shall be placed on the overexcavated trench bottom and staked to the trench walls, coarse bedding material in conformance with these specifications shall be placed on the fabric, and the fabric shall then be un-staked from the trench wall and wrapped over the coarse bedding material forming a closed envelope with a minimum 1-foot overlap at the top edges of the fabric.

F. Any over-excavation carried below the grade ordered, specified, or shown, shall be backfilled and compacted to the required grade with the specified material.

3.04 EMBANKMENT EXCAVATION:

A. The relative compaction of the natural ground area upon which embankments are to be constructed, for a depth of not less than 2 feet below finished grade, shall be not less than 90% relative compaction.

B. If finished grade is less than 3 feet, above natural ground, the natural ground shall be excavated to a depth of not less than 3 feet below finished grade and re-compacted to a relative compaction of not less than 90%.

C. When embankments are to be made and compacted on hillsides, or where new fill is to be compacted against existing embankments, the slopes of the original hillside, old or new fill, shall be cut into a minimum of 6 feet horizontally as the work is brought up in layers. Material thus cut out shall be re-compacted along with the new fill. Fill shall be compacted to a relative compaction of not less than 90%.

3.05 BEDDING AND BACKFILL:

A. Except for required foundation material (in an envelope of geotextile) coarse bedding material being placed in over-excavated areas, where water or soft ground is present, backfill shall not be placed until after all water is removed from the excavation.

B. Pipe zone bedding and backfill operations shall be performed in accordance with the following requirements:

1. Type I Bedding and Backfill Material (Class 2 Aggregate Base) shall be placed and properly compacted in the pipe zone. The pipe zone is defined as that portion of the vertical trench cross-section lying between a plane 4 to 6” below the bottom surface of the pipe, i.e., the trench sub-grade, and a plane at a point 12” above the top outside surface of the pipe. The subzones of the pipe zone are defined as follows:
a) "Bedding is that portion of the Pipe Zone between the bottom of the trench or the top of required foundation material and the lowest point on the outside surface of the pipe barrel excepting bells;
b) "Haunching" is that portion of the Pipe Zone between the top of the Bedding and the horizontal centerline of the pipe;
c) "Shading" is that portion of the Pipe Zone between the top of the Haunching and a horizontal plane 12” above the highest point on the outside surface of the pipe barrel excepting bells.

Page 1200 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 13 of 26

2. Controlled Low Strength Material (CLSM) shall be provided in lieu of Type I Bedding and Backfill Material where indicated on the Plans Contractor shall provide a method to prevent pipe from floating during backfill. (The remaining portions of the trench shall be backfilled as specified elsewhere in this Section.)

3. After compacting the bedding, the Contractor shall perform a final trim using a laser for establishing grade, such that each pipe section when laid will be continually in contact with the bedding along the bottom of the pipe. The Contractor shall provide bell holes at each pipe joint.

4. Backfill in trenches shall be placed uniformly on each side of the pipe to prevent displacement. The Contractor shall exercise care to prevent damage to the pipeline coating, cathodic bonds, or the pipe itself during the installation and backfill operations. The Contractor shall hand shovel slice the bedding along the sides of the pipe in order to ensure filling any voids under the pipe haunches.

C. Warning Tape: A colored detectable metallic foil core plastic tape, at least 3” in width, shall be placed on top of the pipe zone backfill wherever sewers are installed. The tape shall have printed on it the words “Caution: Sewer Buried Below.” The warning tape shall be utilized for all pipes (mains and laterals).

D. After the pipe zone backfill has been placed as specified above, and after all excess water has completely drained from the trench, backfilling of the trench zone may proceed.

The trench zone is defined as that portion of the trench excavation between the top of the shading and the ground surface in unpaved areas, and the horizontal plane at lowest point of the pavement structural section in paved areas.

E. "Final Backfill" is that portion of the Trench Zone in paved areas between the top of the trench backfill and the lowest point of the pavement structural section.

F. Joint utility trench excavations shall conform to the requirements shown on DWG 20-06.

3.06 PLACING AND SPREADING OF BACKFILL AND EMBANKMENT MATERIALS:

A. Backfill materials shall be placed and spread evenly in layers. The backfill layers shall be evenly spread so that each layer shall not exceed 8” in uncompacted thickness. Backfill layers greater than 8” but no more than 24” may be used after the Contractor demonstrates by compaction testing as specified in 3.8 below, that required compaction levels will be achieved.

B. During spreading, each layer shall be thoroughly mixed as necessary to promote uniformity of material in each layer. Pipe zone backfill materials shall be manually spread around the pipe so that when compacted, the pipe zone backfill will provide uniform bearing and side support.

C. Where the backfill material moisture content is below the optimum moisture content, water shall be added before or during spreading until the proper moisture content is within the range where the specified compaction can be achieved.

D. Where the backfill material moisture content is too high to permit the specified degree of compaction, the material shall be bladed, aerated or dried and/or mixed with dryer material until the moisture content is satisfactory.

Page 1201 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 14 of 26
E. Whenever selection is possible, embankment material having a sand equivalent value of less than 10 shall be deposited in the lower portions of embankments and no such material shall be placed within 3 feet of planned finished grade.

F. When the embankment material consists of large rocky material, or hard lumps such as hardpan or cemented gravel which cannot be broken readily, such material shall be well distributed throughout the embankment, and sufficient earth or other fine material shall be placed around the large material as it is deposited so as to fill the interstices and produce a dense compact embankment, but in no case shall any material exceed 24” in any dimension.

3.07 COMPACTION OF BACKFILL AND EMBANKMENT MATERIALS:

A. The Contractor shall provide a minimum of one compaction test per day, and an additional compaction test for each 500 sf completed and at each structure (e.g. manholes), and as required on the Plans or at the direction of the Central San Inspector.

B. Each layer of backfill material as defined herein, shall be mechanically compacted to the specified percentage of maximum density. Equipment that is consistently capable of achieving the required degree of compaction shall be used and each layer shall be compacted over its entire area while the material is at the required moisture content.

Compaction at the top of the pipe zone shall be done using a plate compactor.

C. Flooding, ponding, or jetting shall not be used.

D. Equipment weighing more than 10,000 pounds shall not be used within a horizontal distance equal to the depth of the trench. Hand operated power compaction equipment shall be used where use of heavier equipment is impractical or restricted due to weight limitations.

E. The following compaction requirements shall be in accordance with ASTM D 1557 except for free draining materials (i.e., Coarse Bedding Material/Drain Rock/Foundation Material), which shall be in accordance with ASTM D 4253 and D 4254 for cohesionless free draining type materials. Where other public agency, utility company or encroachment permit requirements govern, the highest compaction standards shall apply.

F. The Contractor shall maintain the indicated trench cross section at a minimum of 12” above the top of the pipe (the top of the “pipe zone”).

G. Embankments shall be constructed as recommended by the geotechnical engineer in compacted layers of uniform thickness.

H. At the time of compaction, the moisture content of embankment material shall be such that the relative compactions specified will be obtained and the embankment will be in a

Page 1202 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 15 of 26
firm and stable condition. Embankment material which contains less than the required moisture content shall be watered and material which contains excessive moisture shall not be compacted until the material is dry enough to obtain the required compaction.

3.08 TEMPORARY PAVING:

A minimum of 2” of cold or hot mix temporary asphalt shall be placed in finished trenches and rolled to a smooth surface at the end of each day unless final paving can be completed, or steel plates are used to cover trenches in paved streets. Traffic plates shall be subject to the requirements of 3.3 above. The temporary asphalt shall be placed within ¼” of finished pavement grade.

END OF SECTION
***************************************************************************************************************************** SECTION 33 01 30.11 - INSPECTION OF SEWERS
PART 1 – GENERAL

1. 01 THE REQUIREMENT:

A. The Contractor shall furnish all labor, materials, tools, and equipment necessary to clean, perform testing, and provide for televising of completed sewer pipelines.

B. The Contractor shall call the Central San Inspection Office at least one business day in advance to arrange for an Inspector to be present for the preinstallation CCTV inspection.

C. The Contractor shall notify the Inspector at least one business day prior to any cleaning, testing, or televising work. All final testing and cleaning of sewer lines shall be done in the presence of the Inspector.

D. The Contractor shall complete cleaning and testing of sewer lines as required in this Section prior to requesting CCTV inspection.

E. No testing will be allowed until all utilities have been installed.

F. If deficiencies are identified during testing, the Contractor shall re-test after the deficiencies have been corrected.

1.02 REFERENCE SPECIFICATIONS, CODES AND STANDARDS:

A. Commercial Standards:

ASTM C 969: Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines
ASTM C 1091-03a: Test Method for Hydrostatic Infiltration Testing of Vitrified Clay Pipe Lines
AWWA C600-54T: Installation of Ductile-Iron Water Mains and Their Appurtenances

Page 1203 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 16 of 26
ASTM D 3034: Specification for Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM F 679: Specification for Poly (Vinyl Chloride) (PVC) Large-Diameter Plastic Gravity Sewer Pipe and Fittings
PART 2 – PRODUCTS

2.01 MATERIAL REQUIREMENTS:

A. Mandrels, temporary plugs, low-pressure testing equipment and all other necessary materials shall be provided by the Contractor, subject to the Inspector’s approval.

B. No materials shall be used which would be injurious to the public, personnel, adjacent improvements or the pipeline.

C. Air test gauges shall be laboratory-calibrated test gauges and shall be recalibrated by a certified laboratory prior to the leakage test. Gauge shall be easy to read in no more than 1 psi per increment and have a maximum full-scale range of 5 psi.

PART 3 – EXECUTION

3.01 GENERAL:

A. The Contractor shall clean pipelines by balling and flushing or hydroflushing prior to deflection and pressure testing.

B. The Contractor shall perform deflection and pressure tests after submittal of compaction reports demonstrating compliance with the backfill compaction requirements and before CCTV inspections.

C. Work shall meet or exceed the requirements of these Specifications unless applicable requirements of an agency having jurisdiction (including the terms and conditions of an encroachment permit issued by a city or county) are greater, in which case the greater requirements shall govern.

3.02 CLEANING:

A. After the pipeline installation has been completed to the satisfaction of Central San, the Contractor shall clean the pipe in the presence of the Inspector.

B. The Contractor shall clean all sewer installations, deemed necessary by the Inspector, with a cleaning ball or device in accordance with the device manufacturer's instructions or recommendations and flushed. Hydroflush-pressure shall be maintained below 2,000 psi.

Traps with screens in accordance with DWG 21-08 shall be used to trap debris. The Contractor shall remove all debris from the manhole prior to removing the trap.

C. Release of water during and/or after cleaning and testing has been completed, shall be performed in a manner approved by the Inspector. The Contractor shall be responsible for the proper disposal of water released.

Page 1204 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 17 of 26
D. The Contractor shall perform an additional cleaning of the pipeline after the installation of final paving, top block, frames and covers, and after all other required inspections, if required by the Inspector due to a reasonable determination that additional debris may have accumulated in the pipeline after initial cleaning.

3.03 PIPELINE DEFLECTION TESTING:

PVC and HDPE pipe 8” in diameter or larger shall be tested for deflection, joint displacement, or other obstruction by passing a rigid mandrel through the pipe. Deflection shall be tested after submittal of daily compaction reports demonstrating compliance with, but prior to, permanent resurfacing. The mandrel shall be a full circle, rigid, non-adjustable, an odd-numbered leg (9 leg minimum), acceptable to the Inspector as to design and manufacturer. Mandrel size shall meet the minimum requirements set forth in ASTM D 3034 and ASTM F 679. The circular cross section of the mandrel shall have a diameter of at least 95% of the specified average inside diameter of the pipe and the minimum length of the circular portion of the mandrel shall be equal to the nominal diameter of the pipe. Where obstructions and excessive deflection encountered by the mandrel, the Contractor shall remove, replace and retest the deficient section. Re-rounding will not be allowed.

3.04 PIPELINE LEAKAGE TESTING:

A. Repaired pipelines shall be re-tested as follows:

B. Air Testing

1. Each section of main sewer and its appurtenant connected laterals shall be tested between successive manholes by plugging and bracing all openings in the sewer lines. If any leaks are found, the air pressure shall be released, the leaks eliminated, and the test procedure started over again.

2. Air tests shall be conducted in accordance with the following procedure and the table below:

Page 1205 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 18 of 26
All necessary test equipment shall be in proper working order and tests shall be made in the presence of the Inspector. Test plugs shall be carefully placed at each end of the section of line to be tested. When all necessary test equipment is in place, a compressed air supply shall be attached to the air fitting on the test equipment and the air pressure within the line increased to 4 psi. After the air supply is securely turned off or disconnected, there shall be a 2-minute waiting period to allow stabilization of air within the sewer line before the actual test period begins. In no case shall the air pressure within the line be less than 3-1/2 psi at the beginning of the test period. The allowable air pressure loss shall not exceed 1 psi. When testing side sewers, or portions thereof, the test period shall be 4 minutes and the allowable loss shall not exceed 1 psi. After completion of a test, the air pressure shall be released slowly through the valve, which is incorporated in the test equipment. Air test plugs shall not be removed until the air pressure is no longer measurable.

C. New sewers larger than 16” diameter shall be hydrostatically tested in accordance with the following procedure:

1. After installation, all new trunk sewer pipelines shall be thoroughly cleaned prior to pressure testing. A section of trunk sewer shall be prepared for testing between two structures by plugging the inlet side of the discharge manhole and all openings in the upstream manhole except the discharge opening. All plugs shall be properly braced against the manhole wall to withstand the forces of the test in order to prevent loss in the event of a failure.

2. A section of the trunk sewer prepared as above shall be tested by filling it with water to an elevation 5 feet above the top of pipe at the upstream end of the test section, or 5 feet above the existing groundwater elevation, whichever is greater. The water shall be introduced into the test section at least one hour in advance of the test period and refilled as necessary prior to commencement of the test period to allow the pipe and joint material to become saturated. The loss in water may be determined by measuring the rate of fall of the water level, but the level shall not be allowed to fall more than one foot below the specified head during the test period.

3. For RCP, the pressure shall be maintained for not less than 4 hours and the leakage rate shall not exceed 200 gallons per inch of diameter per mile of pipe for 24 hours (ASTM C 969-02). For VCP, the pressure shall be maintained for not less than one hour and the leakage rate shall not exceed 200 gallons per inch diameter per mile for 24 hours (ASTM C 1091-03a). For DIP, the pressure shall be maintained for not less than one hour and the leakage rate shall not exceed 70 gallons per inch diameter per mile of pipe of 24 hours (AWWA C600-54T).

D. When leakage exceeds the amount allowed by the specifications, the Contractor shall locate the leaks, submit a repair procedure for the Inspector’s review, and make the necessary repairs.

3.05 MANHOLE TESTING:

A. Hydrostatic Testing: Central San may require hydrostatic testing for leakage after installation and prior to backfilling. Prior to hydrostatic testing, all manholes shall be visually inspected. All defects shall be repaired by the Contractor, with non-shrink grout, to the satisfaction of the Inspector. All pipes entering the manhole shall be sealed at a point outside the manhole walls to include testing of the pipe/manhole joints. Safety lines shall be secured to all plugs utilized. The manhole shall be filled with water to a level 2” below the top of the frame. After a period of at least one hour to allow the water level to stabilize, the manhole shall be refilled and the water level shall be checked. The water level shall again be checked after a period of 4 hours. If the water level drops by more

Page 1206 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 19 of 26
than 1”, the leakage shall be considered excessive, and the Contractor shall make necessary repairs and retest the manhole.

B. Vacuum Testing: As an alternative to manhole hydrostatic testing, the Inspector may allow the use of vacuum testing. A vacuum of 10” of mercury shall be drawn on the manhole, the valve on the vacuum line of the test hood closed and the vacuum pump shut off. The manhole shall be deemed to have passed the test if the vacuum drop is less than 1” of mercury during a one-minute test period.

3.06 CCTV INSPECTION:

A. Central San will perform a CCTV inspection of the sanitary sewer upon substantial completion of the work.

1. The Contractor shall coordinate with the Inspector to arrange for an acceptable time to conduct the inspection.

2. Defects discovered by the CCTV inspection shall be corrected and the line reinspected at the Contractor’s cost.

3. If a portion of an entire job is to be CCTV inspected, a separate fee will be due as established by Central San. Inspection fees are payable prior to the date of the partial CCTV inspection.

4. The Contractor shall request CCTV inspection once the following have been completed:
a) Sewer pipelines are installed, backfilled, and compacted. b) Structures are in place, channeling is complete, and pipelines are accessible from structures.
c) All other underground facilities, utility piping, and conduits in the vicinity are installed.
d) For street locations, placement of aggregate base has been completed. e) Pipelines to be inspected have been cleaned and flushed. f) Final pressure test has been completed.
g) Mandrel testing is complete.

B. The procedure outlined below will be repeated until all deficiencies observed by CCTV inspection have been corrected to the satisfaction of Central San.

1. The Contractor shall request Central San to schedule the CCTV inspection. a) If Central San's CCTV crew arrives at the jobsite and the work is not ready or accessible, the Contractor will be billed the cancellation fee payable to Central San prior to the date of rescheduled CCTV inspection. The Contractor shall reschedule CCTV inspection as outlined above.

2. Central San will televise the job.

Page 1207 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 20 of 26
a) If no deficiencies are observed, the work will be considered satisfactory. b) If deficiencies are observed, a recording will be made and defects serious enough to require correction will be identified by the Inspector who will provide written notification. If corrective work is indicated and viewing of the recording is desired, the Contractor shall contact the Inspector to set a time for the viewing.

All corrective work will be subject to approval by Central San. Central San reserves the right to require cleaning and additional leak testing of the repaired pipeline. Those portions of the pipeline where deficiencies have been corrected shall be re-televised. Payment of re-television inspection fees shall be paid to Central San prior to the scheduled date of the inspection.

C. The following observations from CCTV inspections will require correction:

1. Low spot 0.0625 x diameter of pipe or greater (e.g., 0.5” for an 8” pipe).

2. Joint separations (3/4” or greater opening between pipe sections).

3. Cocked joints present in straight runs or on the inside of pipe curves.

4. Chips in pipe ends.

5. Cracked or damaged pipe.

6. Offset joints.

7. Infiltration.

8. Debris or other foreign objects.

9. Other obvious deficiencies.

D. CCTV inspection of the work and the correction of observed defects shall not relieve the Contractor of its responsibility for the warranty period.

END OF SECTION
************************************************************************************************************************ SECTION 33 05 13 - MANHOLES AND STRUCTURES
PART 1 – GENERAL

1. 01 THE REQUIREMENT:

The Contractor shall furnish and install manholes and structures, complete with precast manhole bases or cast-in-place (if approved during Plan Review), pipe connections, barrel and cone components, preformed joint sealant, grade rings, frames, covers and other appurtenances shown on the Plans or specified in this Section.

Page 1208 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 21 of 26

1.02 RELATED WORK SPECIFIED ELSEWHERE:

A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS:

A. Commercial Standards:

ASTM C 150: Specification for Portland Cement
ASTM C 478: Specification for Precast Reinforced Manhole Sections

1.04 CONTRACTOR SUBMITTALS:

Upon request by Central San, the Contractor shall submit complete shop drawings for all precast manhole bases to Central San and shall receive favorable review prior to ordering the bases.

1.05 QUALITY ASSURANCE:

After installation, the Contractor shall demonstrate that all manholes have been properly installed, level, with tight joints, at the correct elevations and orientations and that the backfilling has been carried out in accordance with the Plans and these Specifications. Vacuum testing of manholes may be required at Central San’s sole discretion.

PART 2 – PRODUCTS

2.01 MATERIALS:

A. Manhole bases may be either cast-in-place or precast. Channels and shelves shall conform to the requirements DWG 19-01 through 19-07. Manhole channels shall be shaped to form a smooth transition of uniform cross-section from inlet pipes to the outlet pipe, both horizontally and vertically.

B. Precast Concrete Components: Only components listed in the Approved Materials List shall be used in the construction of manholes.

1. Precast manhole bases, and barrel and cone sections shall be manufactured by a process that will produce dense homogeneous reinforced concrete of high quality in conformance with ASTM C 478. Cement shall be Type V Portland Cement as specified in ASTM C 150.

2. Precast manhole components shall be designed to support vertical AASHTO H-20 truck loading, plus the weight of soil above the cone section.

Page 1209 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 22 of 26

3. Pipe connections at precast bases shall be pipe bells of the size, material and class of inlet and outlet pipes, integrally cast into the base by the manufacturer.

4. The minimum wall thickness for barrel and cone sections (in inches) shall be calculated by dividing the nominal diameter of the barrel (in inches) by twelve (i.e., D/12).

5. Manhole throats shall be constructed of reinforced concrete grade rings.

C. Preformed plastic sealing gasket for sealing joints between the manhole base, barrel and cone sections shall be as listed in the Approved Materials List.

D. Non-shrink grout shall conform to the requirements Section 03 60 00 – Grout.

E. Castings for manhole frames and covers shall conform to the requirements of Section 05 50 00 - Miscellaneous Metal Work.

F. Primer and sealant tape for sealing exterior joints between precast components shall be as listed in the Approved Materials List.

G. Concrete for cast-in-place manhole and rodding inlet components (bases and top blocks) shall conform to Section 03 30 00 - Cast-In-Place Concrete.

2.02 TEMPORARY COVERS:

Temporary covers for new construction or reconstruction of manholes shall be fabricated as detailed in DWG 19-12.

2.03 TEMPORARY PLUGS:

Temporary plugs shall be of the mechanical expanding type. Pneumatic are not acceptable.

PART 3 – EXECUTION

3.01 GENERAL:

A. Work shall meet or exceed the requirements of these Specifications unless applicable requirements of an agency having jurisdiction (including the terms and conditions of an encroachment permit issued by a city or county) are greater, in which case the greater requirements shall govern.

B. An All-Weather Access Road as specified in this Section is required for access to all structures in off-road locations (e.g., easements).

3.02 INSTALLATION:

A. Temporary Plugs

1. Mechanical expanding-type temporary plugs shall be installed and removed, as specified below, in the presence of an Inspector. Plugs shall be secured by tethering with a ¼” nylon rope attached to the top of a wood 2’x4’ of sufficient length to extend from the shelf to a point in the throat within 6” of the underside of the cover.

Page 1210 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 23 of 26
a) When a manhole exists or a new manhole is constructed at the beginning of a new main extension, a temporary plug shall be installed at the inlet of the new pipe at the existing manhole or new manhole.
b) When a new main extension begins at an existing rodding inlet or stub, a temporary plug shall be installed on the outlet of the first manhole upstream from the beginning of the new main extension.

B. Cast-in-Place Manhole Bases

1. Cast-in-place manhole bases over existing sewers shall be poured against undisturbed native soil, which has been excavated to the dimensions shown on the Plans. For new sewer installations, the cast-in-place manhole base shall be poured over 6” Type 1 Backfill. See DWG 19-01 through 19-08. If the excavation extends beyond the dimensions shown on the Standard Drawings, the Contractor shall construct forms and pour the base to the specified dimensions.

2. If water or soft ground is encountered at the bottom of the excavation, a minimum lift of 9” of coarse-bedding material in a geotextile wrap shall be used as shown on DWG 19-01.

3. A joint forming ring shall be used to form a level joint groove in the manhole base while the concrete is fresh to receive the first precast barrel section. The metal forming ring may be removed as soon as the concrete has set sufficiently to eliminate any slump in the joint groove.

4. Manhole channels shall be shaped to form a smooth transition from inlet pipes to the outlet pipe, both horizontally and vertically.

C. Precast Manhole Bases (on all new main sewer extensions)

1. Precast manhole bases shall be placed to the lines and grades shown on the Plans as an integral part of the pipe laying operation on a minimum thickness of 6” of Type I Bedding and Backfill Material compacted to 95% relative compaction. Where soft ground or water is present, a minimum thickness of 9“ of Coarse Bedding Material in a wrap of geotextile, per the requirements of Section 31 05 19 - Geosynthetics for Earthwork, shall be placed below the course of Type I Bedding and Backfill Material.

2. Inlet and outlet pipe connections at precast bases shall be pipe bells cast into the base by the manufacturer.

3. All precast concrete manholes shall be installed in strict conformance with the manufacturer's written instructions on a well-compacted foundation.

D. Setting Precast Barrel and Cone Sections

1. All joint surfaces of precast manhole bases, barrel and cone sections shall be thoroughly cleaned and dried prior to setting, and shall be sealed with a preformed plastic sealing gasket listed in the Approved Materials List at each joint as follows:
a) Remove the paper wrapper from one side of the gasket, retaining the outside paper in place to protect the gasket and assure against stretching. b) Place the plastic gasket strip in the joint, forming a continuous gasket around the entire circumference of the manhole joint.

Page 1211 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 24 of 26
c) Remove the paper wrapper from the exposed side of the gasket and place the next manhole component.
d) Care shall be taken in the handling of barrel and cone sections after the plastic gasket has been affixed to avoid displacing the gasket or contaminating the joint or gasket with dirt or other foreign material. Any displaced or soiled gaskets shall be removed and replaced.
e) Care shall be taken to properly align the manhole section with the previously set section before it is lowered into position.
f) During cold or wet weather, the joint surfaces shall be heated with hot air until ice, frost, and moisture are removed and surface to be primed is dry and warm.

Hot air shall also be passed over plastic gasket strips immediately prior to attaching them to joint surfaces and immediately prior to setting the section.

E. Manhole frames and covers shall not be set to final grade until the pavement has been completed, unless otherwise approved by Central San. Precast concrete grade rings shall be installed as shown in the Standard Drawings. Paving around the manhole shall be in accordance with local jurisdiction requirements. Openings in manholes shall be protected from construction loads, debris and unauthorized entry.

F. When new piping is installed in existing structures, the Contractor shall accurately position core-drilled openings in the concrete as shown on the job Plans and Standard Drawings or otherwise directed by the Inspector. Openings shall be of sufficient size to permit a final alignment of pipelines and fittings without deflection of any part and to allow adequate space for satisfactory placement of mechanical seals or packing with nonshrink grout where the pipe passes through the wall to ensure the resulting structure is watertight. Before placing the non-shrink grout, concrete surfaces shall be sandblasted, thoroughly cleaned of sand and any other foreign matter, and coated with epoxy bonding compound. After connection of the new inlet pipe, the Contractor shall re-channel the inside of the existing manhole base to provide a smooth flow channel to the new exit pipe.

G. The throat shall be constructed using appropriately sized reinforced concrete grade rings to bring the manhole cover to finished grade surface. No plastic sealing gaskets shall be used for jointing grade or extension rings.

H. Manhole top blocks shall be poured against forms constructed to the specified dimensions shown on DWG 19-01.

I. All manholes located on slopes steeper than 3:1 (horizontal to vertical) in easement areas shall be constructed with a reinforced concrete, reinforced concrete masonry unit or interlocking masonry unit retaining wall as shown on DWG 19-11.

J. All manholes shall be tested in accordance with Section 33 01 30.11 - Inspection of Sewers.

K. Temporary covers shall be used during construction until permanent frames and covers are installed.

3.03 RECONSTRUCTION OF EXISTING STRUCTURES:

A. General

Page 1212 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 25 of 26

1. Reconstruction work on any particular structure shall be diligently prosecuted so as to be completed within 3 calendar days after work is begun on that particular structure.

The Contractor shall provide continuous access for Central San maintenance forces to the structure at all times.

2. When removing existing structures, the Contractor shall take precautions to ensure that no foreign material enters the structure or the downstream system. Before any work is started, the base shall be covered with a plywood (“false bottom”) as shown on DWG 19-13, and then the false bottom shall be covered with a drop cloth of heavy canvas. The drop cloth and false bottom shall be kept in place during the work to catch debris, and upon completion, shall be removed with the collected debris. No debris shall enter the downstream system or be allowed to remain in the manhole.

B. Structure Adjustments and Repairs

1. All workmanship and materials for structure adjustments shall conform to the requirements of these Specifications. In the case of existing brick or cast-in-place concrete structures, repair or adjustments shall be accomplished with materials in-kind or with precast elements as detailed on the Plans.

2. Existing structure precast elements, adjustment rings, frames, and covers removed for adjustments and/or repairs may be reinstalled only when such undamaged items are permitted by the Inspector for reuse.

3. Manhole adjustments shall be accomplished by one of the methods specified below or as shown on the Plans:
a) Upward adjustments of manholes to finish grade surface may be accomplished with reinforced concrete grade rings, formed concrete and/or a single cast iron extension ring when the adjusted manhole throat will not exceed 12” in height. In no case shall multiple cast iron extension rings be used in adjustments. When adjustments are made that position the bottom of the cast iron manhole frame above the existing concrete top block, the top block shall be reconstructed in accordance with the requirements of DWG 19-01 through 19-08. b) Whenever upward adjustment of manholes would result in a completed manhole throat section exceeding 12” in height, the upper manhole section, including the top block and cone section, shall be removed and the adjustment shall be made by reconstructing the structure using manhole barrel and cone sections, grade rings and frames and covers in accordance with the requirements of these Specifications and DWG 19-01 through 19-08.
c) Downward adjustments of manholes shall be accomplished by removal of existing grade or extension rings and cone and barrel sections as required, and reconstructing the structure using manhole barrel and cone sections, grade rings and frames and covers in accordance with the requirements of these Specifications and DWG 19-01 through 19- 08.

4. Rodding inlet adjustments shall be accomplished by one of the methods specified below or as detailed on the Plans:
a) Upward adjustments of rodding inlets shall be accomplished with formed concrete or cast-iron extension rings where the extension will not exceed 8”, including any previous adjustments. When adjustments are made that position the bottom of the cast iron frame above the existing concrete top block, the top

Page 1213 of 1236 ends

SECTION 33 30 00 SANITARY SEWER UTILITIES
SANITARY SEWER UTILITIES 33 30 00 - 26 of 26
block shall be reconstructed in accordance with the requirements of these Specifications and DWG 19-14.
b) Upward adjustments of rodding inlets exceeding 8” shall be accomplished by removing the structure’s frame, cover, and top block, and reconstructing the structure in accordance with the requirements of these Specifications and DWG 19-14. Pipe used for such adjustments shall be as required for pipeline repair and shall be installed to extend the line and grade of the existing pipe. c) Downward adjustments of rodding inlets shall be accomplished by removal and reconstructions of the entire upper section of the structure including the top block.

END OF SECTION

Page 1214 of 1236 ends

300 Seminary Avenue • Ukiah • CA • 95482-5400
Phone: (707)463-6200 · Fax: (707)463-6204 ·www.cityofukiah.com 300 Seminary Av., Ukiah CA 95482

Hydrant Flow Test Report
Name: Corner of Clay/Main
Address:

Tested by: Robby Hulbert Date: 8/8/2023
Requested By: Daniel Flores Time: 7:00 AM
Location of test: Clay/Main
Hydrant ID Number: 287
Residual hydrant location: 506 Main St
Flow hydrant(s) Location: SW Corner of Clay/Main
Static pressure (residual hydrant): 100 psi Hydrant 288 Residual pressure (residual hydrant): 96 psi
Nozzle size (flow hydrant): 2 1/2
Hydrant pressure (flow hydrant): 75 psi
Projected hydrant flow: 1455 GPM
Remarks and comments:

Page 1215 of 1236 ends

Project: Ukiah B of A Remodel Client: City of Ukiah
City: Ukiah, CA
Project No.: Date: December 13, 2024
Building Size: 9,201 SF

CSI DESCRIPTION UNIT PRICE QTY COST
Division 2 - Site Construction
Temporary Controls, Fencing & Signage ls $5,000.00 1 $5,000 Site demolition - Asphalt Pavement sf $7.00 2400 $16,800 Site demolition - Ramp sf $13.00 340 $4,420
Site demolition - Concrete Sidewalk sf $12.00 390 $4,680 Site demolition - Utility trench lf $40.00 300 $12,000
Site demolition - Landscape ls $2,500.00 1 $2,500
Site demolition - Electrical Handhole ls $1,000.00 1 $1,000 Site demolition - Subgrade water valve ls $1,000.00 1 $1,000 Site demolition - ramp landing & stair ls $3,500.00 1 $3,500 Site demolition - generator pad sf $8.00 250 $2,000
Site demolition - Misc ls $2,000.00 1 $2,000
SUBTOTAL $54,900
Division 3 - Concrete
Concrete Reinforcement - Elevator Pit ls $1,000.00 1 $1,000 Concrete Reinforcement - Slab-on-Gade ls $12,500.00 1 $12,500 Concrete - Elevator Pit sf $50.00 100 $5,000
SUBTOTAL $18,500
Division 5 - Metals
Metal Fabrications - Misc. ls $3,000.00 1 $3,000
Metal Fabrications - Stair Handrails lf $110.00 76 $8,360 SUBTOTAL $11,360
Division 6 - Wood & Plastics
Structural Framing - Posts 6x6 ea $500.00 9 $4,500
Structural Framing - PSL Headers ls $15,000.00 1 $15,000 Structural Framing - Standard Headers ls $3,000.00 1 $3,000 Structural Framing - Wall attachments ea $1,850.00 12 $22,200 Rough & Finish Carpentry - Partitions/Framing ls $13,500.00 1 $13,500 Rough & Finish Carpentry - Misc ls $13,500.00 1 $13,500 Interior Architectural Woodwork - Counter lf $725.00 94 $68,150 Interior Architectural Woodwork - Lactation Rm ls $3,500.00 1 $3,500 Interior Architectural Woodwork - Break Rm ls $7,500.00 1 $7,500 SUBTOTAL $150,850
Division 7 - Thermal & Moisture Protection
Roof Patch - penthouse ls $7,500.00 1 $7,500
Interior Acoustical Insulation sf $3.75 9201 $34,504
Roof and Deck Insulation ls $1,250.00 1 $1,250
Sealants ls $5,000.00 1 $5,000
SUBTOTAL $48,254

Page 1 of 5 ends

Attachment 3

Page 1216 of 1236 ends

Project: Ukiah B of A Remodel Client: City of Ukiah
City: Ukiah, CA
Project No.: Date: December 13, 2024
Building Size: 9,201 SF

CSI DESCRIPTION UNIT PRICE QTY COST
Division 8 - Doors & Windows
Wood Door & HM Frame & Hardware ea $3,800.00 18 $68,400 Wood Door & Aluminum Frame & Hardware ea $4,250.00 13 $55,250 HM Door & HM Frame & Hardware ea $3,300.00 3 $9,900
Wood Door & Other Frame & Hardware ea $4,000.00 4 $16,000 Storefront Misc - Interior ls $5,000.00 1 $5,000
Storefront Misc - Exterior ls $2,500.00 1 $2,500
Access Doors and Frames ea $3,800.00 3 $11,400
Aluminum Door & Frame & Hardware ea $5,000.00 3 $15,000 Windows ea $8,000.00 7 $56,000
Sliding Automatic Entrances ea $17,500.00 1 $17,500
Fiberglass Sandwich Panel Skylights sf $140.00 400 $56,000 SUBTOTAL $312,950
Division 9 - Finishes
Non-Structural Metal Framing - Misc. ls $10,000.00 1 $10,000 New partitions - Gyp board lf $330.00 275 $90,750
New partitions - Insulation lf $24.00 275 $6,600
Gypsum Board - interior outside walls lf $40.00 160 $6,400 Gypsum Board - Ceilings sf $14.00 1440 $20,160
Porcelain Tile - Unisex Tlts & Vestibule sf $36.00 3360 $120,960 Acoustical Ceilings sf $17.00 6981 $118,677
Resilient Flooring sf $13.00 4100 $53,300
Resilient Base lf $3.50 1800 $6,300
Static Dissipative Resilient Flooring - IT Room sf $28.00 207 $5,796 Carpet Tile sf $15.00 2680 $40,200
Painting,Interior Walls sf $6.50 8000 $52,000
Painting, Doors and Frames ea $225.00 38 $8,550
Painting, Misc ls $2,500.00 1 $2,500
SUBTOTAL $542,193
Division 10 - Specialties
Signage Interior ls $17,500.00 1 $17,500
Signage Exterior ls $4,000.00 1 $4,000
Folding Glass Partitions ls $60,000.00 1 $60,000
Wall Protection - Corner Guards ls $2,500.00 1 $2,500
Fire Extinguisher Cabinet w/Extinguisher ea $1,500.00 6 $9,000 Grab Bars ea $400.00 12 $4,800
Mirrors ea $750.00 6 $4,500
Soap Dispenser ea $300.00 6 $1,800
Sanitary Napkin Disposal ea $300.00 6 $1,800
Toilet Seat Cover Dispenser ea $300.00 6 $1,800
Toilet Tissue Dispenser ea $300.00 6 $1,800
Towel dispenser waste receptacle ea $350.00 6 $2,100
Robe HooK ea $100.00 6 $600
Diaper Changing Station ea $3,500.00 2 $7,000
SUBTOTAL $119,200

Page 2 of 5 ends
Page 1217 of 1236 ends

Project: Ukiah B of A Remodel Client: City of Ukiah
City: Ukiah, CA
Project No.: Date: December 13, 2024
Building Size: 9,201 SF

CSI DESCRIPTION UNIT PRICE QTY COST
Division 13 - Special Construction
Seismic Restraint for Piping and Equipment sf $3.00 9201 $27,603 SUBTOTAL $27,603
Division 14 - Conveying Systems
Hydraulic Elevator ls $410,000.00 1 $410,000
Elevator penthouse ls $12,500.00 1 $12,500
SUBTOTAL $410,000
Division 21 - Fire Suppression
Fire Riser ls $13,500.00 1 $13,500
Wet-Pipe Sprinkler Systems sf $10.00 9201 $92,010
Total $105,510
Division 22 - Plumbing
General Requirements of Plumbing and HVAC ls $10,000.00 1 $10,000 Siesmic Controls ls $5,000.00 1 $5,000
Demo - Existing plumbing fixtures ls $8,500.00 1 $8,500 Sanitary Sewer - Floor trench ls $9,000.00 1 $9,000
3" Sanitary Line lf $130.00 50 $6,500
2" Sanitary line lf $110.00 128 $14,080
4" Sanitary line lf $150.00 110 $16,500
Plumbing Valves ls $9,000.00 1 $9,000
Domestic Water Piping lf $75.00 780 $58,500
Vent piping ls $17,500.00 1 $17,500
Water Closets ea $2,800.00 6 $16,800
Lavatories ea $1,695.00 6 $10,170
Lactation Rm Sinks (Single) ea $1,375.00 1 $1,375
Break Room Sinks (Double) ea $1,375.00 1 $1,375
Drinking Fountain (Dual Height Bottle Fill) ea $2,000.00 2 $4,000 Floor Drains at Toilets ea $800.00 6 $4,800
Mop Sink ea $1,770.00 1 $1,770
Urinals ea $2,800.00 2 $5,600
SUBTOTAL $200,470
Division 23 - Mechanical
Testing & Balancing ls $10,000.00 1 $10,000
Ductwork - large lf $95.00 445 $42,275
Ductwork - small lf $68.00 830 $56,440
Refrigerant Piping ls $6,500.00 1 $6,500
New ductless condenser unit ls $7,000.00 1 $7,000
Minisplit unit at IT ls $8,500.00 1 $8,500
Air Duct Accessories ls $7,500.00 1 $7,500
Grilles, Registers and Diffusers ls $15,000.00 1 $15,000 SUBTOTAL $153,215

Page 3 of 5 ends
Page 1218 of 1236 ends

Project: Ukiah B of A Remodel Client: City of Ukiah
City: Ukiah, CA
Project No.: Date: December 13, 2024
Building Size: 9,201 SF

CSI DESCRIPTION UNIT PRICE QTY COST
Division 26 - Electrical
Common Work Results for Electrical ls $15,000.00 1 $15,000 Low Voltage ls $5,000.00 1 $5,000
Grounding & Bonding ls $8,000.00 1 $8,000
Hangers & Supports ls $12,500.00 1 $12,500
Raceways & Boxes sf $3.50 9201 $32,204
HVAC and Control Wiring ls $25,000.00 1 $25,000
Wiring - general ls $60,000.00 1 $60,000
Lighting Controls ls $15,000.00 1 $15,000
Panelboards - New ea $4,000.00 3 $12,000
Automatic Transfer Switch ls $40,000.00 1 $40,000
Interior Lighting sf $17.00 9201 $156,417
Exterior Lighting ls $5,000.00 1 $5,000
SUBTOTAL $386,121
Division 28 - Electronic Safety and Security
Physical Access Control System ls $35,000.00 1 $35,000
Access Control - Card Readers ea $2,000.00 10 $20,000
Access Control - System wiring ls $55,000.00 1 $55,000
SUBTOTAL $110,000
Division 31 - Earthwork
Site Grading ls $8,500.00 1 $8,500
SUBTOTAL $8,500
Division 32 - Exterior Improvements
Site Improvements - Concrete Curbs lf $90.00 200 $18,000 Handrails/Guardrails lf $115.00 81 $9,315
Sign Posts ea $3,000.00 3 $9,000
Signage ls $1,500.00 1 $1,500
Truncated Domes ls $1,000.00 1 $1,000
Site Improvements - Generator Pad sf $15.00 250 $3,750
Site Improvements - Concrete ADA Stalls sf $50.00 470 $23,500 Site Improvements - Concrete - Sidewalk sf $50.00 981 $49,050 Site Improvements - Asphalt Paving sf $15.00 760 $11,400 Site Improvements - Asphalt Utility Trench sf $15.00 800 $12,000 Site Improvements - Wheel Stops ea $1,500.00 6 $9,000
Site Improvements - Pavement Markings ls $2,000.00 1 $2,000 Site Improvements - Landscape ls $2,000.00 1 $2,000
SUBTOTAL $151,515

Page 4 of 5 ends
Page 1219 of 1236 ends

Project: Ukiah B of A Remodel Client: City of Ukiah
City: Ukiah, CA
Project No.: Date: December 13, 2024
Building Size: 9,201 SF

CSI DESCRIPTION UNIT PRICE QTY COST
Division 33 - Utility
Utility Trench - New Handhole ea $5,000.00 1 $5,000
Demo - Light and Pole ea $2,500.00 1 $2,500
Exterior Site Lighting - replace ea $3,000.00 2 $6,000
Exterior Site Lighting - new with pole ea $18,500.00 1 $18,500 Exterior Site Lighting - new with pole at ADA ea $11,500.00 1 $11,500 Utility Trench lf $125.00 300 $37,500
Utility Trench - Sanitary Sewer pipe lf $105.00 200 $21,000 Primary service connection ls $40,000.00 1 $40,000
Generator ls $125,000.00 1 $125,000
Generator feeder lf $120.00 100 $12,000
Utilities - Sewer - Coupling & Fittings ls $5,000.00 1 $5,000 SUBTOTAL $284,000
Construction Cost Subtotal $3,095,140
Division 1 - General Requirements & Fees
General Conditions % 10.00% $309,514
Bond, Insurance & Permit % 2.00% $61,903
Contingency % 10.00% $309,514
SUBTOTAL $680,931
Construction Cost Total $3,776,071
Summary Subtotal
Division 1 - General Requirements & Fees $680,931 74.01 Division 2 - Site Construction $54,900 5.97
Division 3 - Concrete $18,500 2.01
Division 5 - Metals $11,360 1.23
Division 6 - Wood & Plastics $150,850 16.39
Division 7 - Thermal & Moisture Protection $48,254 5.24 Division 8 - Doors & Windows $312,950 34.01
Division 9 - Finishes $542,193 58.93
Division 10 - Specialties $119,200 12.96
Division 13 - Special Construction $27,603 3.00
Division 14 - Conveying Systems $410,000 44.56
Division 21 - Fire Suppression $105,510 11.47
Division 22 - Plumbing $200,470 21.79
Division 23 - Mechanical $153,215 16.65
Division 26 - Electrical $386,121 41.97
Division 28 - Electronic Safety and Security $110,000 11.96 Division 31 - Earthwork $8,500 0.92
Division 32 - Exterior Improvements $151,515 16.47
Division 33 - Utility $284,000 30.87
TOTAL $3,776,071 $ 410.40 per SF

Page 5 of 5 ends
Page 1220 of 1236 ends
Page 1 of 2 ends

Agenda Item No: 14.a.

MEETING DATE/TIME: 1/15/2025

ITEM NO: 2025-41

AGENDA SUMMARY REPORT
SUBJECT: Review and Consider the Fiscal Year 2025-26 Budget Development Schedule.

DEPARTMENT: Finance PREPARED BY:

Dan Buffalo, Finance Director, Olga Keough,
Controller, Mary Horger, Financial Services
Manager, Diana Ramos, Assistant Accountant,
Jessie Brunell, Financial Controller
PRESENTER: Dan Buffalo, Finance Director
ATTACHMENTS:

1. Budget Development Schedule 2025-26

2. Budget Schedule Diagram 2025-26 - Council Ready
Summary: The Council will receive and consider the City's operating and capital budget development and adoption schedule for the 2025-26 fiscal year (abbreviated as 2026).

Background: California's law requires that an annually-approved appropriation plan be considered for all local governmental entities. Most produce a budget to satisfy that requirement. The City of Ukiah will develop a budget document for the 2026 fiscal year built on best practices, focused on clarity, and presented at the highest level of quality per the guidelines of the Government Finance Officers Association.

Discussion: A sound, well-managed budget for a governmental entity is a living document. It is subject to regular review and amendment, is clear and understandable, is scrutinized frequently, and its development thoughtfully planned and executed. The City of Ukiah’s 2026 budget will exhibit these characteristics, starting with planning. Attachment 1, Budget Development Schedule 2025-26, outlines the development process, key dates, and milestones. It is principally a management document. A summarized version highlighting the major events by month is attached as Attachment 2.

Note: This schedule is flexible and currently in draft. It may be revised as necessary. Council members should review and hold dates/times on their calendar. Council members should also report any potential conflicts to Dan Buffalo, Director of Finance.

Recommended Action: Receive and consider the City's operating and capital budget development and adoption schedule for the 2025-26 fiscal year.

BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: City Manager
DIVERSITY-EQUITY INITIATIVES (DEI): N/A
CLIMATE INITIATIVES (CI): N/A
GENERAL PLAN ELEMENTS (GP): N/A

Page 1221 of 1236 ends
Page 2 of 2 ends
Page 1222 of 1236 ends

City of Ukiah
Budget Development Schedule
(Working Draft)
Fiscal Year 2025-26
Task Name Budget Year Start date Due date Tag Description Personnel Requests Due to HR Budget Development 2026 11/04/2024 12/06/2024 This is revision to past years' budget
development schedule.

Submit your requested personnel changes
to Sheri by the due date indicated on this
task. This includes any requested additions,
deletions, class changes, etc.

Budget Kick-off with Executive and
Departmental BudgetTeams
Budget Development 2026 01/16/2025 Planning and preparations for the 2025-26 budget development.

Preliminary Budget Calendar Released to
Council Budget Development 2026 01/15/2025
Narrative Updates Budget Development 2026 02/03/2025 02/28/2025 Departments begin this process.

Update period to budget narratives,
notably departmental.

Period also includes updates to objectives
and accomplishments.
5-Year CIP Update Budget Development 2026 01/13/2025 02/28/2025 General Fund Pre-Approved Budget Sums
Released Budget Development 2026 02/28/2025
- Departments that operate in the
general fund will receive a pre-approved
budget amount for non-personnel,
non-capital accounts.
- Departments must not exceed that
amount with their initial budget requests.
- Capital accounts do not apply to this
new process.
- Personnel accounts do not apply to
this new process as they are governed by
personnel requests approved by HR and
the City Manager.
- Requests for additional
appropriation may be submitted after
March 31 when Finance has completed its
initial budget review. More details on
this process will be forthcoming after April

1. Departmental Mid-Year Report to City
Council (Round 1) Budget Development 2026 03/19/2025 SAVE THE DATE! 4:00 PM Start
-City Manager's Office
-Community Development
-Electric Utility
-Airport
Budget Central Open in Munis Budget Development 2026 03/01/2025 03/31/2025 Munis Central Budget is open to all
departments to enter their budget requests
for the coming year.

City Council Strategic Plan Review Budget Development 2026 04/02/2025 04/02/2025 SAVE THE DATE! Departmental Mid-Year Report to City
Council (Round 2) Budget Development 2026 04/02/2025 SAVE THE DATE! 4:00 PM Start
-Human Resources
-Public Works
-Water Resources
City Manager and Finance review of
budget requests Budget Development 2026 04/01/2025 04/13/2025 - Review appropriation requests
- Meet with Finance for
discussion/analysis
- Finance to conduct preliminary revenue
forecasts for all major funds
Departmental Mid-Year Report to City
Council (Round 3) Budget Development 2026 04/16/2025 SAVE THE DATE! 4:00 PM Start
-Fire
-Police
-Community Services
-Finance
Departmental Budget Meetings with
Finance Budget Development 2026 04/25/2025
Draft Budgets to Third-Party Agencies Budget Development 2026 05/01/2025 -UVSD
-UVFA
-UVWA
-MSWMA
Rev. 1/8/2025
Attachment 1

Page 1223 of 1236 ends

City of Ukiah
Budget Development Schedule
Fiscal Year 2025-26
Budget Hearings with Third-Party Agencies Budget Development 2026 05/05/2025 05/16/2025 -Present budget
-Receive input and feedback
-Finalize recommendations to City Council
and other governing bodies
Finalize Draft Budget Document Budget Development 2026 05/21/2025 05/21/2025 - Finalize revenue estimates
- Complete special revenue funds and
trust/agency funds
- Circulate for review/edits
Budget Draft Review and Comment Period Budget Development 2026 05/19/2025 05/26/2025 Budget presentation draft released to departments for review and comment
Budget Workshop with Council Budget Development 2026 06/02/2025 SAVE THE DATE! 3:00 PM start
-Overview presentation of budget proposal
-Discussion of changes from prior year
-Department presentation
-CIP review
-Discussion and Q&A
-Take requests and revisions
Budget Hearings (cont): Departmental
Presentations Budget Development 2026 06/03/2025 SAVE THE DATE! 3:00 PM Start Budget Hearings (cont): Departmental
Presentations Budget Development 2026 06/04/2025 SAVE THE DATE! 3:00 PM Start Budget Hearing (cont): Adoption Budget Development 2026 06/18/2025 SAVE THE DATE! Rev. 1/8/2025
Attachment 1

Page 1224 of 1236 ends

Budget Development Schedule (Working)
Fiscal Year 2025-26 (2026)
Finance Department Rev 1/8/2025
•Personnel and Prep
•Personnel requests and analysis January •Budget planning and prep •Narrative and CIP
•Departmental narratives
•Utilities and Public Works preliminary 5-Year CIP requests to Mary •All departments 5-Year CIP requests to Mary February •Personnel budgets entered into Munis by HR •Munis budget entry by departments
•Departments enter operational (materials, supplies, and services) budgets March •Departments enter approved 5-year CIP capital •Meetings
•Analysis April •Revisions
May •Document and presentation preparation
•Hearings
•City-wide presentation by Finance
•Departmental presentations June •Adoption
Attachment 2

Page 1225 of 1236 ends
Page 1 of 2 ends

Agenda Item No: 14.b.

MEETING DATE/TIME: 1/15/2025

ITEM NO: 2025-39

AGENDA SUMMARY REPORT
SUBJECT: Possible Introduction of Ordinance by Title Only Amending the City Code Provisions Regarding Enforcement of Business License Regulations.

DEPARTMENT: Community
Development PREPARED BY: Darcy Vaughn, Assistant City Attorney PRESENTER: Craig Schlatter, Community Development
Director; Darcy Vaughn, Assistant City Attorney
ATTACHMENTS:

1. Business License Enforcement Authority Ordinance Redline

2. Business License Enforcement Authority Ordinance Clean Summary: Council will consider introducing by title only an Ordinance amending Article 6 in Division 2, Chapter 1 of the Ukiah City Code to allow the Director of Finance to delegate enforcement authority for the City's business license regulations to the Chief Code Enforcement Official, in addition to the Chief of Police.

Background: Division 2, Chapter 1 of the City Code sets forth requirements and regulations for businesses operating in the City of Ukiah to obtain and renew business licenses. The vast majority of these provisions were adopted in 1961 and few have been updated since their adoption. Prudent management practices require a periodic review of these provisions to consider potentially beneficial additions, amendments, or deletions of provisions as may be deemed necessary. As part of the larger review of these provisions undertaken by the Community Development Department, Staff determined that while enforcement authority over the business license requirements and regulations is properly given to the Director of Finance, as business licenses are deemed a tax by case law, the Code Enforcement Division of the Community Development Department may be better equipped to efficiently enforce these provisions as part of their general code enforcement authority.

Article 6 of Division 2, Chapter 1, which contains the enforcement provisions for business licenses, currently authorizes the Director of Finance to delegate enforcement authority only to the Chief of Police and states that assistants of the Director, including police officers, may conduct inspections of businesses to determine whether a place of business is operating with a current and valid business license. Staff recommends that these provisions be amended via ordinance ("Ordinance") to allow the Director of Finance to delegate enforcement authority to the Chief Code Enforcement Official and to authorize code enforcement officers to conduct business license inspections.

Discussion: The Ordinance, attached hereto as Attachment 1 (Redline) and Attachment 2 (Clean) amends Section 2170 of the City Code to state that the Director of Finance has the duty to enforce all provisions of Division 2, Chapter 1 regarding business license regulations, and that the Chief Code Enforcement Official, in addition to the Chief of Police, are directed to assist the Director in enforcement as may be required. This Section is also amended to state that every staff member in the Code Enforcement Division of the Community Development Department is appointed an Assistant License Inspector and directed to assist the Director of Finance in the enforcement of Division 2, Chapter 1.

In addition, the Ordinance amends Section 2171 of the City Code to state that code enforcement officers are authorized to act as assistants of the Director of Finance in fulfilling his duty to examine each business to

Page 1226 of 1236 ends
Page 2 of 2 ends

confirm compliance with the business license requirements and regulations.

Staff recommends Council introduce the Ordinance in Attachment 2 by title only, which would amend the City Code provisions regarding enforcement of business license regulations.

Recommended Action: Introduce by title only the Ordinance amending the City Code provisions regarding enforcement of business license regulations.

BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: Yes / No GRANT: Yes / No N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Craig Schlatter, Community Development Director; Matt Keizer, Chief Code Enforcement Officer; Dan Buffalo, Director of Finance
DIVERSITY-EQUITY INITIATIVES (DEI): N/A
CLIMATE INITIATIVES (CI): N/A
GENERAL PLAN ELEMENTS (GP): Policy LU-14.1 Code Enforcement

Page 1227 of 1236 ends
Page 1 of 2 ends

ORDINANCE NO.X
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UKIAH AMENDING ARTICLE 6, CHAPTER 1, DIVISION 2 OF THE CITY CODE TO DELEGATE AUTHORITY TO THE CITY’S CODE ENFORCEMENT DEPARTMENT TO ENFORCE VIOLATIONS OF THE CITY’S BUSINESS LICENSE REGULATIONS.

The City Council of the City of Ukiah hereby ordains as follows:

SECTION ONE.

Article 6 in Division 2, Chapter 1 of the Ukiah City Code is hereby amended to read as follows :
§ 2170 DIRECTOR OF FINANCE AS ENFORCING AUTHORITY
It shall be the duty of the Director of Finance, and he/she is hereby directed to enforce each and all of the provisions of this Chapter. The Chief of Police is and Chief Code Enforcement Official are hereby directed to render such assistance in the enforcement hereof as may from time to time be required by the Director of Finance. Every member of the Police Department and Code Enforcement Division of the Community Development Department areis hereby appointed an Assistant License Inspector and directed to assist the Director of Finance in the enforcement of this Chapter. §2171 DUTY TO EXAMINE EACH BUSINESS
It shall be the duty of the Director of Finance, acting through his deputies and assistants, to examine each business to determine that this Chapter is being complied with. He or she and any of his or her deputies and assistants, including police officers and code enforcement officers, may enter any business free of charge and demand exhibition of the business license. Refusal of any person to so exhibit such license shall be a misdemeanor.

SECTION TWO.

1. Publication: Within fifteen (15) days after its adoption, this Ordinance shall be published once in a newspaper of general circulation in the City of Ukiah. In lieu of publishing the full text of the Ordinance, the City may publish a summary of the Ordinance once 5 days prior to its adoption and again within fifteen (15) days after its adoption.

2. Effective Date: The ordinance shall become effective thirty (30) days after its adoption.

3. Severability: If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance, or its application to any person or circumstance, is for any reason held to be invalid or unenforceable, such invalidity or unenforceability shall not affect the validity or enforceability of the remaining sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases of this Ordinance, or its application to any other person or circumstance. The City Council of the City of Ukiah hereby declares that it would have adopted each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact that any one or more other sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases hereof be declared invalid or unenforceable.

Attachment 1

Page 1228 of 1236 ends
Page 2 of 2 ends

Introduced by title only on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Adopted on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Douglas F. Crane, Mayor
ATTEST:

Araceli Sandoval, Deputy City Clerk

Page 1229 of 1236 ends
Page 1 of 2 ends

ORDINANCE NO.X
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UKIAH AMENDING ARTICLE 6, CHAPTER 1, DIVISION 2 OF THE CITY CODE TO DELEGATE AUTHORITY TO THE CITY’S CODE ENFORCEMENT DEPARTMENT TO ENFORCE VIOLATIONS OF THE CITY’S BUSINESS LICENSE REGULATIONS.

The City Council of the City of Ukiah hereby ordains as follows:

SECTION ONE.

Article 6 in Division 2, Chapter 1 of the Ukiah City Code is hereby amended to read as follows:
§ 2170 DIRECTOR OF FINANCE AS ENFORCING AUTHORITY
It shall be the duty of the Director of Finance, and he/she is hereby directed to enforce each and all of the provisions of this Chapter. The Chief of Police and Chief Code Enforcement Official are hereby directed to render such assistance in the enforcement hereof as may from time to time be required by the Director of Finance. Every member of the Police Department and Code Enforcement Division of the Community Development Department are hereby appointed an Assistant License Inspector and directed to assist the Director of Finance in the enforcement of this Chapter. §2171 DUTY TO EXAMINE EACH BUSINESS
It shall be the duty of the Director of Finance, acting through his deputies and assistants, to examine each business to determine that this Chapter is being complied with. He or she and any of his or her deputies and assistants, including police officers and code enforcement officers, may enter any business free of charge and demand exhibition of the business license. Refusal of any person to so exhibit such license shall be a misdemeanor.

SECTION TWO.

1. Publication: Within fifteen (15) days after its adoption, this Ordinance shall be published once in a newspaper of general circulation in the City of Ukiah. In lieu of publishing the full text of the Ordinance, the City may publish a summary of the Ordinance once 5 days prior to its adoption and again within fifteen (15) days after its adoption.

2. Effective Date: The ordinance shall become effective thirty (30) days after its adoption.

3. Severability: If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance, or its application to any person or circumstance, is for any reason held to be invalid or unenforceable, such invalidity or unenforceability shall not affect the validity or enforceability of the remaining sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases of this Ordinance, or its application to any other person or circumstance. The City Council of the City of Ukiah hereby declares that it would have adopted each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact that any one or more other sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases hereof be declared invalid or unenforceable.

Attachment 2

Page 1230 of 1236 ends
Page 2 of 2 ends

Introduced by title only on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Adopted on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Douglas F. Crane, Mayor
ATTEST:

Araceli Sandoval, Deputy City Clerk

Page 1231 of 1236 ends
Page 1 of 2 ends

Agenda Item No: 14.c.

MEETING DATE/TIME: 1/15/2025

ITEM NO: 2025-25

AGENDA SUMMARY REPORT
SUBJECT: New Year Review, Discussion, and Appointments Regarding 2025 Council Assignments; and Consideration of Disbandment and Modification to City Council Committees and Ad Hocs/Standing Committees.

DEPARTMENT: City Clerk PREPARED BY: Kristine Lawler, City Clerk PRESENTER: Mayor Crane and City Manager Sangiacomo
ATTACHMENTS:

1. Draft 2025 City Council Special Assignments
Summary: City Council members will provide reports and updates on their committee and ad hoc/standing committee assignments.

Each year following the rotation of the mayor position, the incoming mayor leads a review of assignments. The Council will also consider modifications, additions and elimination of committee and ad hocs/standing committees.

Background: Local / County / Regional Committees - City of Ukiah Councilmembers take an active role in various commissions and committees that are part of city, county, regional, and statewide governance and interests. Each year, the incoming mayor leads a discussion and makes annual appointments for members assigned to various committee assignments. Committee assignments are organized into Local / County / Regional classifications. Roles on committee assignments will vary from liaison to a voting board seat. Assignments are typically filled by a Councilmember, but in some cases it may be appropriate or desired to appoint a Staff member. In some instances, there might be a primary and alternate designated for assignment.

Ad Hoc and Standing Committees - The City Council may establish and appoint ad hoc and standing committees at any time throughout the year. Ad Hocs are established on an as needed, temporary basis for the purpose of addressing particular issues and will disband once the work is complete. Standing Committees are established for the purpose of addressing broader and/or ongoing issues and are subject to the Brown Act meeting noticing requirements.
***Note: Although the Council Ad Hoc and Standing Committees are a part of the Council Special Assignment List, they are officially appointed by the Council at various meetings, and are subject to Council approval for any changes.

Discussion: Attachment #1 is a draft of the 2025 Council Special Assignment List and Ad Hoc Committees, inclusive of recommended changes - delineated by added text and strike-through edits in red for vacated positions and Council request. Mayor's recommendations are in green. In addition, ad hoc committees highlighted in red are recommended by Staff for disbandment.

The Mayor will lead a discussion with Council regarding Council committee assignments and make any appointments or reassignments per that discussion. In addition, the Council will consider modifications, additions and disbandment of ad hocs and standing committees. Staff recommends directing the City Clerk to

Page 1232 of 1236 ends
Page 2 of 2 ends

attach the finalized copy of the 2025 City Council Special Assignments List to the January 15, 2025, minutes for recordation.

Note: All subsequent agendas throughout the year will have a continuation item to allow Council to receive reports on committee and ad hoc work and to allow for further modifications (including the addition of any new ad hocs) as warranted.

Recommended Action: 1) Receive report(s); 2) Discuss the Mayor's recommended assignments, making any possible appointments or re-assignments; 3) Consider the possible continuation, disbandment, and addition of City Council Ad Hoc and/or committees; and 4) Direct the City Clerk to finalize and attach the 2025 Council Assignments and Ad Hoc/Standing Committees List to the January 15, 2025, Minutes.

BUDGET AMENDMENT REQUIRED: No
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Mayor Crane
DIVERSITY-EQUITY INITIATIVES (DEI): N/A
CLIMATE INITIATIVES (CI): N/A
GENERAL PLAN ELEMENTS (GP): N/A

Page 1233 of 1236 ends

2025 CITY COUNCIL SPECIAL ASSIGNMENT LIST

LOCAL / UKIAH VALLEY MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT City Broadband Project TBD TBD
Civic Center300 Seminary Ave.Ukiah, CA 95482
to evaluate the Request for Proposal (RFP) for the Internet Service Provider (ISP) for the California's Public Utilities Commission (CPUC) Last Mile Broadband Orozco Jim Robbins, Grants Manager, 463-6708; [email protected] Investment Oversight Committee Varies
Civic Center300 Seminary Ave.Ukiah, CA 95482
Civic Center300 Seminary Ave.Ukiah, CA 95482
Reviews City investments, policies, and strategies
Crane
Orozco - AlternateAlan Carter, Treasurer
Dan Buffalo, Director of Finance; 463-6220 [email protected] Disaster Council
Shall meet a minimum of once a year at a time and place designated upon call of the chair Place designated upon call of the chair or, if
she/he is unavailable or unable to call such meeting, the first vice chair and then the City Manager or her/his designee.

Office of Emergency Management
300 Seminary Ave. Ukiah, CA 95482467-5720 - Traci Boyl
Develop any necessary emergency and mutual aid plans, agreements, ordinances, resolutions, rules, and regulations.

OrozcoDuenas Criss -
Alternate Request: Criss
Traci Boyl, City Manager's Office Management Analyst; 467-5720; [email protected] Greater Ukiah Business & Tourism Alliance (GUPTA)
4th Monday of month, 10 a.m.
200 S School St.Ukiah, CA 95482
200 S School St.Ukiah, CA 95482
Promotes tourism and works to strengthen and promote the historic downtown and businesses within the greater Ukiah area Marianne Davison - Community Services Department Staff Duenas Orozco - Alternate Request: Orozco
Shannon Riley, Deputy City Manager;
467-5793 [email protected]
Mendocino County Inland Water and Power Commission (IWPC) 2nd Thursday of month, 6:00 p.m.

Civic Center300 Seminary Avenueconference room 5
IWPC Staff P.O. Box 1247Ukiah, CA 95482391-7574 - Candace Horsley Develops coordination for water resources and current water rights: Potter Valley project - Eel River Diversion RodinOrozco - Alternate
Sean White, Director of Water Resources; 463-5712 [email protected] North Coast Opportunities (NCO) 4th Wednesday of month, 2 p.m. Alternating locations - Ukiah and Lakeport Governing Board ChairNorth Coast Opportunities413 North State StreetUkiah, CA 95482 Assist low income and disadvantaged people to become self reliant Neil DavisRequest: CrissThis Request will require NCO application and approval; Staff recommends reconsidering after a year given the recent appointment of Director Davis. Mayor Recommends No Change Neil Davis, Community Services Director; [email protected] Sun House Guild ex officio 2nd Tuesday of month, 4:30 p.m. Sun House 431 S. Main St. Ukiah, CA 431 S. Main Street Ukiah, CA 95482 467-2836 Support and expand Grace Hudson Museum Duenas Orozco, Sher Neil Davis - Alternate Requests: Orozco, Criss, Sher David Burton, Museum Director; 467-2836 [email protected] Ukiah Valley Basin Groundwater Sustainability Agency (GSA) 2nd Thursday of month, 1:30 p.m.

Board of Supervisors Chambers; 501 Low
Gap RoadUkiah, CA
County Executive Office501 Low Gap Rd., Rm. 1010Ukiah, CA 95482463-4441 GSA serves as the Groundwater Sustainability Agency in the Ukiah Valley basin CraneDuenas- Alternate
Sean White, Director of Water Resources; 463-5712 [email protected]

MENDOCINO COUNTY MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT City Selection Committee Called as required by the Clerk of the Board BOS Conference Room 501 Low Gap Rd. Rm. 1090 Ukiah, CA C/O: BOS 501 Low Gap Rd., Rm 1090 Ukiah, CA 95482 463-4441 Makes appointments to LAFCO and Airport Land Use Commission (Mayor - Primary; Vice Mayor - Alternate) Mayor Duenas Crane Vice Mayor Crane Sher Kristine Lawler, City Clerk; 463-6217 [email protected] Economic Development & Financing Corporation (EDFC)
2nd Thursday of month, 2:00 p.m.

Primarily 631 S. Orchard Street (location varies)
Executive Director631 South Orchard AvenueUkiah, CA 95482467-5953 Multi-agency co-op for economic development and business loan program Riley (appointed 12/19/18) Shannon Riley, Deputy City Manager; 467-5793 [email protected] Library Advisory Board
3rd Wednesdays of alternate months; 1:00
p.m.

Various Mendocino County Libraries Ukiah County Library 463-4491 Review library policy and activities Sher Rodin - Alternate Kristine Lawler, City Clerk; 463-6217; [email protected] Mendocino County 1st District Liaison Monthly; TBD
Civic Center Annexconference room #5411 West Clay St.Ukiah, CA 95482 Civic Center300 Seminary Ave.Ukiah, CA 95482
To coordinate activities and policy development with the City's 1st District Supervisor RodinCrane- AlternateMayor Recommendation:Crane Rodin - Alternate Sage Sangiacomo, City Manager;
463-6221; [email protected]
Mendocino County 2nd District Liaison 1st Wednesdays of month, 8:00 a.m.

Civic Center Annexconference room #5411 West Clay St.Ukiah, CA 95482 Civic Center300 Seminary Ave.Ukiah, CA 95482
To coordinate activities and policy development with the County's 2nd District Supervisor RodinDuenas - Alternate
Shannon Riley, Deputy City Manager;467-5793 [email protected] Mendocino Council of Governments (MCOG)
1st Monday of month, 1:30 p.m.

Board of Supervisors Chambers501 Low Gap RoadUkiah, CA
Executive Director
367 N. State Street, Ste. 206 Ukiah, CA 95482463-1859
Plan and allocate State funding, transportation, infrastructure and project County wide Duenas Criss
Sher - AlternateRequests: Orozco, Criss
Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino County Airport Land Use Commission As needed
BOS Conference Room501 Low Gap Rd., Rm. 1090,Ukiah, CA
Mendocino County Executive Office
501 Low Gap Rd. Rm. 1010 Ukiah, CA 95482
To formulate a land use compatibility plan, provide for the orderly growth of the airport and the surrounding area, and safeguard the general welfare of the inhabitants within the vicinity Liaisons: Owen/Schlatter
Greg Owen, Airport Manager; 467-2855;
[email protected] Schlatter, Director of Community Development; 463-6219; [email protected] Updated: 1/10/2025
ATTACHMENT 1
DRAFT

Page 1234 of 1236 ends

2025 CITY COUNCIL SPECIAL ASSIGNMENT LIST
Mendocino County Local Area Formation Commission (LAFCO) 1st Monday of month, 9:00 a.m. Board of Supervisors Chambers Executive Director200 S. School Street, Ste. 2 Ukiah, CA 95482463-4470 Required by legislation - planning spheres of influence, annexation, service areas, and special districts
Rodin
Crane - Alternate for both city seat members on Commission Request: Criss Mayor Recommendation: No Change due to defined terms/appointees made by City Selection Committee
Craig Schlatter, Director of Community Development; 463-6219; [email protected]

MENDOCINO COUNTY
Continued MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Mendocino Solid Waste Management Authority (MSWMA)
3rd Thursday of every other month (varies), 10:00 a.m.

Willits Council Chambers
Solid Waste Director3200 Taylor DriveUkiah, CA 95482468-9710 County-wide Solid Waste JPA Crane Sher - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino Transit Authority (MTA) Board of Directors
Last Wednesday of month, 1:30 p.m.

Alternating locations - Ukiah Conference Center or Fort Bragg, or Point Arena Executive Director
241 Plant RoadUkiah, CA 95482462-1422
County-wide bus transportation issues and funding Sher Duenas - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino Youth Project JPA Board of Directors
3rd Wednesday of month, 7:45 a.m. 776 S. State Street Conference Room Mendocino Co. Youth Project
776 S. State Street, Ste. 107Ukiah, CA 95482 707-463-4915 Targets all youth with a focus on drug and alcohol prevention, healthy alternatives and empowering youth to make healthy choices Cedric Crook, Police Chief Duenas Criss - Alternate
Request: Criss
Cedric Crook, Police Chief; 463-6771; [email protected] Russian River Flood Control District
(RRFCD) Liaison
1st Monday of month, 5:30 p.m.
151 Laws Ave.,Suite D Ukiah, CA
151 Laws Ave., Ukiah, CA 95482; [email protected]; 462-5278 Proactively manage the water resources of the upper Russian River for the benefit of the people and environment of Mendocino County White/Orozco Sean White, Director of Water Resources; 463-5712 [email protected] Ukiah Players Theater Board of Directors
3rd Tuesday of month, 6:00 p.m
1041 Low Gap Rd Ukiah, CA 95482 462-1210
1041 Low Gap RdUkiah, CA 95482462-1210
To oversee the activities, organization and purpose of the Ukiah Players Theater Greg Owen, Airport Manager(appointed 12/19/18)
Kristine Lawler, City Clerk; 463-6217 [email protected] Ukiah Unified School District (UUSD) Committee Quarterly 511 S. Orchard, Ste. D Ukiah, CA 95482 511 S. Orchard Ukiah, CA 95482 Information exchange with UUSD Board Chair, Mayor, Superintendent, and City Manager Duenas Orozco, Criss
Rodin - AlternateSage Sangiacomo, City ManagerCedric Crook, Police ChiefRequests: Orozco, Criss, Sher Sage Sangiacomo, City Manager; 463-6221 [email protected]

REGIONAL MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Great Redwood Trail Agency (GRTA) Bi-monthly, 3rd Thursdays, 10:30 a.m. Various Locations - announced 419 Talmage Road, Suite M
Ukiah, CA 95482463-3280
Provides a unified and revitalized rail infrastructure meeting the freight and passenger needs of the region RodinDuenas Sher- Alternate
Requests: Orozco, Criss, Sher
Neil Davis, Community Services Director467-5764 [email protected] League of California Cities Redwood Empire Legislative Committee Prior to Division Meetings, meets 3x in person and then via conference call Various locations that are announced
Redwood Empire League President;
Public Affairs Program Manager
(916) 658-8243
Elected city officials and professional city staff attend division meetings throughout the year to share what they are doing and advocate for their interests in Sacramento Duenas Orozco
Orozco - Alternate
Sage Sangiacomo, City Manager; 463-6221 [email protected] Russian River Watershed Association (RRWA)
4th Thursday of month, 9:00 a.m. (only 5 times a year)
Windsor Town Hall9291 Old Redwood Hwy, #400Windsor, CA 95492707-838-1000 Russian River Watershed Association 2235 Mercury Way, Suite 105Santa Rose, CA [email protected] 707-508-3670 (message only) Consider issues related to Russian river - plans projects and funding requests RodinSher - Alternate
Tim Eriksen, Public Works Director/City Engineer;
463-6280 [email protected]
Northern California Power Agency (NCPA) - Commission
4th Thursday of month, 9:00 a.m. (see NCPA calendar)
Roseville, CA and other locations
651 Commerce Drive Roseville, CA 95678916-781-4202
Pool of State and local power utilities developing and operating power generation, providing scheduling and related energy services and providingregulatory and legislative support.

Crane - Commissioner Sher - City Council Alternate Sauers - Alternate and Commissioner in absence of Commissioner Crane
Cindi Sauers - Electric Utility Director;463-6286 [email protected] Northern California Power Agency (NCPA) – Lodi Energy Center (LEC) Appointment 2nd Monday of month, 10:00 AM Lodi, CA and other locations 651 Commerce DriveRoseville, CA 95678916-781-4299
Committee oversees the operation, maintenance and expenditures of the LEC 300 MW generating project.

Sauers – Project Participate Appointee
Cindy Sauers, Electric Utility Director,463-6286, [email protected] Transmission Agency of Northern California (TANC)
4th Wednesday of month, 10 a.m. 35 Iron Point Circle Suite 225 Folsom, CA 35 Iron Point Cir #225Folsom, CA 95630916-852-1673; [email protected] Provide electric transmission to its Member utilities through transmission line ownership or contract arrangements.

CraneSauers - Alternate
Cindi Sauers - Electric Utility Director;463-6286 [email protected]

STANDING COMMITTEES MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Diversity and Equity TBD Virtual Meeting Room (link to be created) Civic Center 300 Seminary Ave. Ukiah, CA 95482 Improve diversity and equity in the City’s workforce and municipal services Orozco/Duenas Criss Request: Criss Traci Boyl, City Manager's Office Management Analyst; 467-5720; [email protected] Fire Executive Committee
2nd Tue, every other month beginning in January; 5:00 p.m.

Ukiah Valley Conference Center,200 S. School Street Ukiah, CA Civic Center
300 Seminary Ave.Ukiah, CA 95482 [email protected]
Per the recently adopted agreement between the City of Ukiah and the Ukiah Valley Fire Protection District Orozco/SherAlternates: CrissRequest: Criss
Doug Hutchison, Fire Chief; 463-6263; [email protected] Countywide Oversight Board to the RDA Successor Agencies 4th Thursday of January, 4:00 p.m.; meets annually
Ukiah Valley Conference Center,200 S. School Street Ukiah, CA City of UkiahATTN: City Clerk300 Seminary Ave.Ukiah, CA 95482 Oversee and direct the Successor Agencies of the former redevelopment agencies Crane Dan Buffalo, Director of Finance; 463-6220 [email protected] Lawler, City Clerk; 463-6217, [email protected] Water Executive Committee(Ukiah Valley Water Authority) 1st Tue of each month
at 6:00 p.m.

Ukiah Valley Conference Center,200 S. School Street Ukiah, CA City of UkiahATTN: Sean White300 Seminary Ave.Ukiah, CA 95482 Oversight of UVWA; set annual budget for the combined water system; Manage rates and collect levies; modify existing water rights for the provision of water service; mediation and dispute resolution; Crane/OrozcoRequest: RodinMayor Recommendation: No Change Sean White, Director of Water Resources; 463-5712 [email protected] Updated: 1/10/2025
DRAFT

Page 1235 of 1236 ends

COMMITTEE ASSIGNED TO PRINCIPAL STAFF SUPPORT
Electric Grid Operational Improvements Crane/Orozco Cindy Sauers, Electric Utility Director; 463-629586 [email protected]
Trench Cut Policy Development Crane Tim Eriksen, Public Works Director/City Engineer; 463- 6280 [email protected]
Advance Planning & Policy Sphere of Influence (SOI),
Municipal Service Review (MSR), Annexation, Tax
Sharing, Detachment, and Out of Area Service
Agreements
Recommending disbandment due to advanced planning
items having been completed, but the addition of a new
ad hoc for annexation applications (below)
Crane/Rodin
Craig Schlatter, Community Development Director
463-6219 [email protected]
Advance Planning & Policy for Annexation
Applications Crane/Rodin
Craig Schlatter, Community Development Director
463-6219 [email protected]
UVSD/ City Relations
Ad hoc committee to address specific issues with the Ukiah Valley Sanitation District, including discussion of overall sewer system service delivery policies, operating policy revisions, potential revisions to the current Operating Agreement, and cost sharing
Crane/Orozco
Dan Buffalo, Director of Finance;
463-6220 [email protected]
Sean White, Water Resources Director
463-5712 [email protected]
Orr Street Bridge Corridor Rodin/Sher Tim Eriksen, Public Works Director/City Engineer; 463- 6280 [email protected]
Complete Streets Rodin/Crane
Request*: Criss
Tim Eriksen, Public Works Director/City Engineer; 463-
6280 [email protected]
Shannon Riley, Deputy City Manager
467-5793 [email protected]
Neil Davis, Community Services Director
467-5764 [email protected]
Special Districts (Water District Consolidation) Orozco/Crane Shannon Riley, Deputy City Manager 467-5793 [email protected]
Corp Yard Planning Crane/Orozco Jason Benson, Senior Civil Engineer 463-6284 [email protected]
Mendocino County Courthouse Project and Reuse Sher/Orozco Shannon Riley, Deputy City Manager 467-5793 [email protected]
Climate Action Plan
Will coordinate with the Community Development Director to identify and assign representation to each of the identified categories, and also coordinate with the Community
Development Director and the Climate Action Plan Working Group related to other outreach efforts during the development of the draft municipal Climate Action Plan related to the 2040 General Plan
Sher/Duenas Criss
Requests: Orozco, Criss
Craig Schlatter, Community Development Director
463-6219 [email protected]
City's 150-Year Anniversary Planning Orozco/Rodin Shannon Riley, Deputy City Manager 467-5793 [email protected]
Zoning Reform
Function is to explore creation of a new ministerial zoning permit and identify additional zoning streamlining and reform efforts to provide better and more consistent development outcomes
Crane/Orozco
Request*: Criss
Craig Schlatter, Community Development Director
463-6219 [email protected]
Community Health Needs Assessment (CHNA)
Steering Committee
assist in the creation of the 2025 CHNA Report for the
communities served by the three Adventist Health hospitals in Mendocino County. providing insight, identifying, gathering and analyzing the health needs of our community. Additionally Rodin/Sher
Request*: Criss
Jeremy Malin, NP
Director of Community Health Analytics
Adventist Health Howard Memorial
Adventist Health Ukiah Valley
Adventist Health Mendocino Coast
978-289-3330; [email protected]
Parks & Recreation Special District Exploration Rodin/Orozco Neil Davis, Community Services Director 467-5764 [email protected]
Downtown Zoning code Crane/Rodin
Request*: Criss
Craig Schlatter, Community Development Director
463-6219 [email protected]
Tourism Advisory Committee Rodin/Sher Shannon Riley, Deputy City Manager 467-5793 [email protected]
City Council Handbook Review and Update Sher Kristine Lawler, City Clerk 463-6217; [email protected]
2025 AD HOC COMMITTEES
Updated: 1/10/2025
DRAFT

Page 1236 of 1236 ends