CUTTING AND PATCHING 01 73 29 – 4 of 4
SECTION 01 73 29 CUTTING AND PATCHING
D. Cleaning: Clean areas and spaces where cutting and patching are performed.
Completely remove paint, mortar, oils, putty, and similar materials.
END OF SECTION
CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 1 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
PART 1 - GENERAL
1.1 SUMMARY – WASTE MANAGEMENT GOALS
A. Section includes administrative and procedural requirements for salvaging, recycling and disposing of nonhazardous demolition and construction waste.
B. The Owner has established that this Project shall generate the least amount of waste possible and processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors shall be employed.
C. Of the inevitable waste that is generated, as many of the waste materials as economically feasible shall be reused, salvaged, or recycled. Waste disposal in landfills shall be minimized.
1.2 DEFINITIONS
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.
C. Disposal: Removal of off-site waste and subsequent sale, recycling, reuse or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
D. Hazardous: Exhibiting the characteristics of hazardous substances, i.e., ignitability, corrosivity, toxicity or reactivity.
E. Recyclable: The ability of a product or material to be recovered at the end of its life cycleand remanufactured into a new product for reuse by others.
F. Recycle: Recovery of waste from the Project site to another site for subsequent processing in preparation for reuse
G. Recycling: The process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for the purpose of recycling. Recycling does not include burning, incinerating, or thermally destroying waste.
H. Salvage: To remove a waste material from the Project site for subsequent sale or reuse in another facility.
CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 2 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
I. Salvage and Reuse: Recovery of waste and subsequent incorporation into the Work
1.3 PERFORMANCE REQUIREMENTS
A. Develop and implement a waste management program resulting in an end-of-project rates for salvage/recycling of minimum 65 percent by weight or volume of the total waste generated by the project. Refer the Contra Costa Cal Green Construction and Demolition.
Debris Recovery Program and follow the CalGreen Applicant Instructions (https://www.contracosta.ca.gov/DocumentCenter/View/61489/CalGreenApplicant- Instructions---Non-Residential-Projects?bidId=).
B. Regulations: The Contractor shall be responsible for knowing and complying with regulatory requirements, Federal, State, and Local, pertaining to legal disposal of all construction and demolition waste materials.
C. Coordination: Coordinate the recycling of materials with Owner and Subcontractors as required to conform to the Construction Waste Management Plan.
D. Site Access and Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Waste Management Meetings: Conduct on-site waste management meetings with all subcontractors. Review and discuss the waste management plan, methods, procedures and each party’s roles and responsibilities.
C. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.
D. Packing and Shipping
1. Shipping: Coordinate the schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
2. Packing: Arrange for the return of packing materials, such as wood pallets, where economically feasible.
E. Handling
1. Provide equipment and personnel to handle products by methods to prevent soiling or damage.
2. Promptly inspect shipments to assure products comply with requirements, quantities are correct, and products are undamaged.
3. Promptly return damaged shipments or incorrect orders to manufacturer for
CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 3 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
credit or refund.
F. Storage: Store products in accordance with manufactures recommendations and periodically inspect to assure that stored products are undamaged and are maintained under required conditions.
G. Preparation
1. Storage and Protection:
a. Designate receiving/storage areas for incoming material to be delivered according to installation schedule and to be placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. b. Store and handle materials in a manner as to prevent loss from weather and other damage. Keep materials covered and off the ground, and store in a dry, secure area.
c. Prevent contact with material that may cause corrosion, discoloration, or staining.
d. Protect all materials and installations from damage by the activities of other trades.
H. Waste Management
1. Source separated waste: Separate, store, protect, and handle at the site identified recyclable and salvageable waste products in order to prevent contamination of materials and to maximize recyclability and salvageability of identified materials.
2. Comingled Waste: Waste may be commingled at the site and separated at a recycling facility.
3. Return: Set aside and protect missed-delivered and substandard products and materials and return to supplier for credit.
4. Reuse and Salvage: Set aside, sort, and protect separated products and materials for collection, re-use on site by contractor, and salvage by other.
5. Recycling: Arrange for timely pickups from the site or deliveries to recycling facility in order to prevent contamination of recyclable materials.
1.5 WASTE MANAGEMENT PLAN
A. General: Develop a waste management plan according to the requirements in this Section, as well as the requirements indicated in the LEED for Building Design and Construction New Construction Reference Guide, version 2009, under Materials and Resources Credit 2 – Construction Waste Management. Plan shall consist of the following sections: Waste Management Goals, Responsible Parties, Waste Identification, Waste Prevention and Diversion Measures, Contamination Prevention Measures, Communication and Education Measures, Onsite Recycling Operations, and Cost/Revenue Analysis. Distinguish between demolition and construction waste. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan. The plan shall result in end-of-Project rates for salvage/recycling of minimum 65 percent by weight or volume of the total waste generated by the work. Refer the Contra Costa Cal Green Construction and Demolition Debris Recovery Program and follow the CalGreen applicant Instructions. (https://www.contracosta.ca.gov/DocumentCenter/View/61489/CalGreen-ApplicantInstructions---Non-Residential-Projects?bidId=).
CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 4 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
B. Waste Identification: Indicate anticipated types and quantities of demolition, site- clearing and construction waste generated by the Work. Include estimated quantities and assumptions for estimates
C. The list of these materials is to include, at minimum, the following materials:
1. Cardboard.
2. Clean dimensional wood.
3. Beverage containers.
4. Land clearing debris.
5. Concrete.
6. Bricks.
7. Concrete Masonry Units (CMU).
8. Metals from banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized sheet steel, stainless steel, aluminum, copper, zinc, lead, brass, and bronze.
9. Drywall.
10. Carpet and carpet pads.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 WASTE MANAGEMENT PLAN IMPLEMENTATION
A. Manager: The Contractor shall designate an on-site party (or parties) responsible for instructing workers and overseeing and documenting results of the Waste Management Plan for the Project.
B. Distribution: The Contractor shall distribute copies of the Waste Management Plan to the Job Site Foreman, each Subcontractor, the Owner, and the Owner’s Representative.
C. Instruction and Training: The Contractor shall provide on-site instruction and train workers, subcontractors and suppliers of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used.
D. Separation facilities: The Contractor shall layout and label a specific area to facilitate separation of materials for potential recycling, salvage, reuse, and return. Recycling and waste bin areas are to be kept neat and clean and clearly marked in order to avoid contamination of materials.
Waste may be commingled at the site in a specific label area for pickup by the waste hauler and separated at a recycling facility.
E. Hazardous wastes: Hazardous wastes shall be separated, stored, and disposed of according to local regulations.
F. Contractor shall provide a monthly summary to the LEED Consultant with the following information:
CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 5 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
G. The amount (in tons or cubic yards) of material landfilled from the Project, the identity of the landfill, the total amount of tipping fees paid at the landfill, and the total disposal cost.
Include manifests, weight tickets, receipt, and invoices.
H. For each material recycled, reused, or salvaged from the Project, the amount (in tons or cubic yards), the date (removed from the jobsite, the receiving party, the transportation cost, the amount of any money paid or received for the recycled or salvaged material, and the net total cost or savings of salvage or recycling each material). Attach manifests, weight tickets, receipts, and invoices.
3.2 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL A. General: Recycle paper and beverage containers used by on-site workers.
B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Owner.
Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.
C. Procedures: Separate recyclable waste from other waste materials, trash, and debris.
Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan
D. Provide appropriately marked containers or bins for controlling recyclable waste until removed from Project site. Include list of acceptable and unacceptable materials at each container and bin. Regularly inspect bins for contamination.
E. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
F. Stockpile materials away from construction area. Do not store within drip line of remaining trees.
G. Store components off the ground and protect from the weather.
H. Remove recyclable waste from Owner's property per approved Waste Management Plan.
3.3 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of to accumulate on-site.
CONSTRUCTION WASTE MANAGEMENT 01 74 19 – 6 of 6
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3.4 INSTALLATION
A. Install product(s) per manufacturer's recommendations to reduce damage to or waste of materials by required replacement.
3.5 TRANSPORTATION
A. Transport materials in covered trucks to prevent contamination of product or littering of surrounding areas.
3.6 GENERAL CLEANING
A. Control accumulation of waste materials and trash. Recycle or dispose of off-site at intervals approved by the Owner and in compliance with waste management procedures.
B. Cleaning materials: Use cleaning materials that are non-hazardous.
3.7 FINAL CLEANING
A. Cleaning Materials: Only non-hazardous cleaning materials shall be used in the final cleanup.
B. Recycle, salvage, and return construction and demolition waste from Project.
C. Arrange for pick-up of salvageable materials in accordance with the Waste Management Plan.
D. Disposal Operations: Promptly and legally transport and dispose of any trash. Do not burn, bury, or otherwise dispose of trash on the Project site.
END OF SECTION
CLEANING 01 74 20 - 1 of 4
SECTION 01 74 20 CLEANING
PART 1 – GENERAL
1.1 Section Includes
A. Cleaning throughout the construction period, and final project cleaning prior to the acceptance tour.
1.2 Quality Assurance
A. Inspection: Conduct daily inspection, and more often if necessary, to verify that requirements of cleanliness are being met.
B. Codes and Standards: In addition to the requirements specified herein, comply with pertinent requirements of authorities having jurisdiction.
PART 2 – PRODUCTS
2.1 Cleaning Materials and Equipment
A. Provide required personnel, equipment, and materials needed to maintain the specified standard of cleanliness.
2.2 Compatibility
A. Use cleaning materials and equipment that are compatible with the surfaces being cleaned, as recommended by the manufacturer of the material to be cleaned.
PART 3 – EXECUTION
3.1 Progress Cleaning
A. General:
1. Retain stored items in an orderly arrangement allowing maximum access, not impeding drainage or traffic, and providing the required protection of materials.
2. Do not allow the accumulation of scrap, debris, waste material, and other items not required for construction of this work. Debris shall be removed from the site and disposed of in a lawful manner. Disposal receipts or dump tickets shall be furnished to Architect upon request.
3. At least twice each month, and more often if necessary, remove scrap debris, and waste material from the job site.
CLEANING 01 74 20 - 2 of 4
SECTION 01 74 20 CLEANING
4. Provide adequate storage for items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.
B. Site:
1. Daily, and more often if necessary, inspect the site and pick up all scrap, debris, and waste material. Remove items to the place designated for their storage. Flammable waste shall be kept in sealed metal containers until removed from the site.
2. Weekly, and more often if necessary, inspect, arrangements of materials stored on the site; restack, tidy, or otherwise service arrangements to meet the requirements specified above.
3. Maintain the site in a neat and orderly condition.
C. Structures:
1. Weekly, and more often if necessary, inspect the structures and pick up scrap, debris, and waste material. Remove items to the place designated for their storage.
2. Weekly, and more often if necessary, sweep interior spaces clean. a. “Clean”, for the purpose of this subparagraph, shall be interpreted as meaning free from dust and other material capable of being removed by use of reasonable effort and a handheld broom, i.e., “broom-clean”.
3. As required preparatory to installation of succeeding materials, clean the structures of pertinent portions thereof to the degree of cleanliness recommended by the manufacturer of the succeeding material, using equipment and materials required to achieve the required cleanliness.
4. Following the installation of finish floor materials, clean the finish floor daily, and more often if necessary, and while work is being performed in the space in which finish materials have been installed.
a. “Clean”, for the purpose of this subparagraph, shall be interpreted as meaning free from foreign material that, in the opinion of the Architect, may be injurious to the finish floor material, i.e., “vacuum-clean”.
D. General: The General Conditions require general cleaning during construction. Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris, and waste, conduct final progress cleaning as described below.
E. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. Comply with manufacturer's instructions. Unless otherwise specifically directed by the Architect, water and broom clean paved areas on the site and public paved areas directly adjacent to the site. Remove resultant debris F. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion.
1. Remove labels that are not permanent labels.
CLEANING 01 74 20 - 3 of 4
SECTION 01 74 20 CLEANING
2. Clean transparent materials, including mirrors and glass in doors and windows.
Remove glazing compounds and other substances that are noticeable visionobscuring materials. Replace chipped or broken glass and other damaged transparent materials.
G. Clean exposed exterior and interior hard-surfaced finishes to a dust-free condition, free of stains, films, and similar foreign substances. Restore reflective surfaces to their original condition. Leave concrete floors broom clean. Vacuum carpeted surfaces. Sweep and mop vinyl and rubber surfaces.
H. Structures:
3. Exterior: In areas affected by the work under this contract, visually inspect exterior surfaces and remove traces of soil, waste material, smudges, and other foreign matter. Remove traces of splashed material from adjacent surfaces. If necessary to achieve a uniform degree of exterior cleanliness, hose down the exterior of the structure.
4. In the event of stubborn stains not removable with water, the Architect may require light sandblasting or other cleaning at no additional cost to the District.
I. Interior: In areas affected by the work under this contract, visually inspect interior surfaces and remove traces of soil waste material, smudges, and other foreign matter. Remove traces of splashed materials from adjacent surfaces. Remove paint drippings, spots, stains, and dirt from finished surfaces. Use only the cleaning materials and equipment instructed by the manufacturer of the surface material.
J. Glass: Clean glass inside and outside.
K. Polished surfaces: On surfaces requiring the routine application of buffed polish, apply the polish recommended by the manufacturer of the material being polished. Glossy surfaces shall be cleaned and shined as intended by the manufacturer
5. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and other substances. Clean plumbing fixtures to a sanitary condition. Clean light fixtures and lamps.
6. Clean the site, including landscape development areas, of rubbish, litter, and other foreign substances. Sweep paved areas broom clean; remove stains, spills, and other foreign deposits. Rake grounds that are neither paved nor planted to a smooth, eventextured surface.
L. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid the Project of rodents, insects, and other pests.
M. Removal of Protection: Remove temporary protection and facilities installed for protection of the Work during construction.
N. Compliance: Comply with regulations of authorities having jurisdiction and safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess
CLEANING 01 74 20 - 4 of 4
SECTION 01 74 20 CLEANING
materials on the District's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site and dispose of lawfully.
O. Extra Materials: Where extra materials of value remain after completion of associated Work, they become the District's property. Dispose of these materials as directed by the Owner.
P. Timing: Schedule final cleaning as accepted by the Architect to enable the District to accept a completely clean project.
Q. Cleaning During District's Occupancy
7. Should the District occupy the work or any portion thereof prior to its completion by the Contractor and acceptance by the District, responsibilities for interim and final cleaning of the occupied spaces shall be determined by the Architect in accordance with the General Conditions of the Contract.
END OF SECTION
CLOSEOUT PROCEDURES 01 77 00 – 1 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Inspection procedures.
2. Final Completion.
3. Warranties.
4. Final cleaning.
5. Repair of work.
B. 01 79 00 "Demonstration and Training" for requirements for instructing Owner's personnel.
C. See Divisions 02 through 48 Sections for specific closeout and special cleaning requirements for the Work in those Sections.
1.2 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise Owner of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.
6. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.
7. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.
8. Complete startup testing of systems.
9. Submit test/adjust/balance records.
10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.
11. Advise Owner of changeover in heat and other utilities.
12. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.
13. Complete final cleaning requirements, including touchup painting.
14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
15. Successful completion of Functional Testing for equipment requiring LDD Commissioning.
B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final
CLOSEOUT PROCEDURES 01 77 00 – 2 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
Completion.
1.3 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit a final Application for Payment according to "Payment Procedures."
2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
4. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements.
Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit electronic versions of list (including editable file and PDF file). Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
1. Organize list of spaces in sequential order, starting with exterior areas first.
2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.
3. Submit list of incomplete items in the following format:
a. MS Excel electronic file. Architect, though Construction Manager, will retune annotate copy.
1.5 WARRANTIES
A. Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.
B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.
1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8- 1/2-by-11- inch paper.
2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty.
Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.
3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.
C. Provide additional copies of each warranty to include in operation and maintenance manuals.
CLOSEOUT PROCEDURES 01 77 00 – 3 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Remove snow and ice to provide safe access to building. f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
g. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
h. Sweep concrete floors broom clean in unoccupied spaces. i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if visible soil or stains remain.
j. Clean transparent materials, including mirrors and glass in doors and windows.
Remove glazing compounds and other noticeable, vision- obscuring materials.
Replace chipped or broken glass and other damaged transparent materials.
Polish mirrors and glass, taking care not to scratch surfaces. k. Remove labels that are not permanent.
l. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. 1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.
m. Wipe surfaces of mechanical and electrical equipment and similar equipment.
Remove excess lubrication, paint and mortar droppings, and other foreign substances.
CLOSEOUT PROCEDURES 01 77 00 – 4 of 4
SECTION 01 77 00 CLOSEOUT PROCEDURES
n. Replace parts subject to unusual operating conditions. o. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.
p. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.
q. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.
r. Leave Project clean and ready for occupancy.
C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 1 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
PART 1 – GENERAL
1.1 SUMMARY
A. Commissioning is intended to achieve the following specific objectives; this section specifies the Contractor's responsibilities for commissioning:
1. Verify that the work is installed in accordance with Contract Documents and the manufacturer’s recommendations and instructions, and that it receives adequate operational checkout prior to startup: Startup reports and Prefunctional Checklists executed by Contractor are utilized to achieve this.
2. Verify and document that functional performance is in accordance with Contract Documents: Functional Tests executed by Contractor and witnessed by the Commissioning Authority are utilized to achieve this.
3. Verify that operation and maintenance manuals submitted to Airport are complete:
Detailed operation and maintenance (O&M) data submittals by Contractor are utilized to achieve this.
4. Verify that the Airport’s operating personnel are adequately trained: Formal training conducted by Contractor is utilized to achieve this.
B. The Commissioning Authority directs and coordinates all commissioning activities; this section describes some but not all of the Commissioning Authority's responsibilities.
1.2 RELATED REQUIREMENTS
A. Section 01 77 00 - Closeout Submittals: Scope and procedures for operation and maintenance manuals and project record documents.
PART 2 – PRODUCTS
2.1 TEST EQUIPMENT
A. Provide all standard testing equipment required to perform startup and initial checkout and required Functional Testing; unless otherwise noted such testing equipment will NOT become the property of Airport.
B. Calibration Tolerances: Provide testing equipment of sufficient quality and accuracy to test and/or measure system performance with the tolerances specified. If not otherwise noted, the following minimum requirements apply:
1. Temperature Sensors and Digital Thermometers: Certified calibration within past year to accuracy of 0.5 degree F and resolution of plus/minus 0.1 degree F.
2. Pressure Sensors: Accuracy of plus/minus 2.0 percent of the value range being measured (not full range of meter), calibrated within the last year.
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 2 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
3. Calibration: According to the manufacturer’s recommended intervals and when dropped or damaged; affix calibration tags or keep certificates readily available for inspection.
C. Equipment-Specific Tools: Where special testing equipment, tools and instruments are specific to a piece of equipment, are only available from the vendor, and are required in order to accomplish startup or Functional Testing, provide such equipment, tools, and instruments as part of the work at no extra cost to Airport; such equipment, tools, and instruments are to become the property of Airport.
D. Dataloggers: Independent equipment and software for monitoring flows, currents, status, pressures, etc. of equipment.
1. Dataloggers required to for Functional Tests will be provided by the Commissioning Authority and will not become the property of Airport.
PART 3 – EXECUTION
3.1 COMMISSIONING PLAN
A. Commissioning Authority has prepared the Commissioning Plan.
1. Attend meetings called by the Commissioning Authority for purposes of completing the commissioning plan.
2. Require attendance and participation of relevant subcontractors, installers, suppliers, and manufacturer representatives.
B. Contractor is responsible for compliance with the Commissioning Plan.
C. Commissioning Plan: The commissioning schedule, procedures, and coordination requirements for all parties in the commissioning process.
D. Commissioning Schedule:
1. Submit anticipated dates of startup of each item of equipment and system to Commissioning Authority within 60 days after award of Contract.
2. Re-submit anticipated startup dates monthly, but not less than 4 weeks prior to startup.
3. Prefunctional Checklists and Functional Tests are to be performed in sequence from components, to subsystems, to systems.
4. Provide sufficient notice to Commissioning Authority for delivery of relevant Checklists and Functional Test procedures, to avoid delay.
3.2 STARTUP PLANS AND REPORTS
A. Startup Plans: For each item of equipment and system for which the manufacturer provides a startup plan, submit the plan not less than 8 weeks prior to startup.
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 3 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
B. Startup Reports: For each item of equipment and system for which the manufacturer provides a startup checklist (or startup plan or field checkout sheet), document compliance by submitting the completed startup checklist prior to startup, signed and dated by responsible entity.
C. Submit directly to the Commissioning Authority.
3.3 PREFUNCTIONAL CHECKLISTS
A. A Prefunctional Checklist is required to be filled out for each item of equipment or other assembly specified to be commissioned.
1. No sampling of identical or near-identical items is allowed.
2. These checklists do not replace manufacturers' recommended startup checklists, regardless of apparent redundancy.
3. Prefunctional Checklist forms will not be complete until after award of the contract; the following types of information will be gathered via the completed Checklist forms:
a. Certification by installing contractor that the unit is properly installed, started up, and operating and ready for Functional Testing.
b. Confirmation of receipt of each shop drawing and commissioning submittal specified, itemized by unit.
c. Manufacturer, model number, and relevant capacity information; list information "as specified," "as submitted," and "as installed." d. Serial number of installed unit.
e. List of inspections to be conducted to document proper installation prior to startup and Functional Testing; these will be primarily static inspections and procedures; for equipment and systems may include normal manufacturer’s start-up checklist items and minor testing.
f. Sensor and actuator calibration information.
B. Contractor is responsible for filling out Prefunctional Checklists, after completion of installation and before startup; witnessing by the Commissioning Authority is not required unless otherwise specified.
1. Each line item without deficiency is to be witnessed, initialed, and dated by the actual witness; checklists are not complete until all line items are initialed and dated complete without deficiencies.
2. Checklists with incomplete items may be submitted for approval provided the Contractor attests that incomplete items do not preclude the performance of safe and reliable Functional Testing; re-submission of the Checklist is required upon completion of remaining items.
3. Individual Checklists may contain line items that are the responsibility of more than one installer; Contractor shall assign responsibility to appropriate installers or subcontractors, with identification recorded on the form.
4. If any Checklist line item is not relevant, record reasons on the form.
5. Contractor may independently perform startup inspections and/or tests, at Contractor's option.
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 4 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
6. Regardless of these reporting requirements, Contractor is responsible for correct startup and operation.
7. Submit completed Checklists to Commissioning Authority within two days of completion.
C. Commissioning Authority is responsible for furnishing the Prefunctional Checklists to Contractor.
1. Initial Drafts: Contractor is responsible for initial draft of Prefunctional Checklist where so indicated in Contract Documents.
2. Provide all additional information requested by Commissioning Authority to aid in preparation of checklists, such as shop drawing submittals, manufacturers' startup checklists, and O&M data.
3. Commissioning Authority may add any relevant items deemed necessary regardless of whether they are explicitly mentioned in Contract Documents or not.
4. When asked to review the proposed Checklists, do so in a timely manner.
D. Commissioning Authority Witnessing: Required for:
1. Each piece of primary equipment, unless sampling of multiple similar units is allowed by the commissioning plan.
2. A sampling of non-primary equipment, as allowed by the commissioning plan.
E. Deficiencies: Correct deficiencies and re-inspect or re-test, as applicable, at no extra cost to Airport.
1. If difficulty in correction would delay progress, report deficiency to the Commissioning Authority immediately.
3.4 FUNCTIONAL TESTS
A. A Functional Test is required for each item of equipment, system, or other assembly specified to be commissioned, unless sampling of multiple identical or near-identical units is allowed by the final test procedures.
B. Contractor is responsible for execution of required Functional Tests, after completion of Prefunctional Checklist and before closeout.
C. Commissioning Authority is responsible for witnessing and reporting results of Functional Tests, including preparation and completion of forms for that purpose.
D. Contractor is responsible for correction of deficiencies and re-testing at no extra cost to Airport; if a deficiency is not corrected and re-tested immediately, the Commissioning Authority will document the deficiency and the Contractor's stated intentions regarding correction.
1. Deficiencies are any condition in the installation or function of a component, piece of equipment or system that is not in compliance with Contract Documents or does not perform properly.
2. When the deficiency has been corrected, the Contractor completes the form certifying that the item is ready to be re-tested and returns the form to the
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 5 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
Commissioning Authority; the Commissioning Authority will reschedule the test and the Contractor shall re-test.
3. Identical or Near-Identical Items: If 10 percent, or three, whichever is greater, of identical or near-identical items fail to perform due to material or manufacturing defect, all items will be considered defective; provide a proposal for correction within 2 weeks after notification of defect, including provision for testing sample installations prior to replacement of all items.
4. Contractor shall bear the cost of Airport and Commissioning Authority personnel time witnessing re-testing.
5. Contractor shall bear the cost of Airport and Commissioning Authority personnel time witnessing re-testing if the test failed due to failure to execute the relevant Prefunctional Checklist correctly; if the test failed for reasons that would not have been identified in the Prefunctional Checklist process, Contractor shall bear the cost of the second and subsequent re-tests.
E. Functional Test Procedures:
1. Some test procedures are included in Contract Documents; where Functional Test procedures are not included in Contract Documents, test procedures will be determined by the Commissioning Authority with input by and coordination with Contractor.
2. Examples of Functional Testing:
a. Test the dynamic function and operation of equipment and systems (rather than just components) using manual (direct observation) or monitoring methods under full operation (e.g., the chiller pump is tested interactively with the chiller functions to see if the pump ramps up and down to maintain the differential pressure setpoint). b. Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc.
c. Systems are run through all the HVAC control system’s sequences of operation and components are verified to be responding as the sequence's state. d. Traditional air or water test and balancing (TAB) is not Functional Testing; spot checking of TAB by demonstration to the Commissioning Authority is Functional Testing.
F. Deferred Functional Tests: Some tests may need to be performed later, after substantial completion, due to partial occupancy, equipment, seasonal requirements, design or other site conditions; performance of these tests remains the Contractor's responsibility regardless of timing.
3.5 SENSOR AND ACTUATOR CALIBRATION
A. Calibrate all field-installed temperature, relative humidity, carbon monoxide, carbon dioxide, and pressure sensors and gauges, and all actuators (dampers and valves) on this
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 6 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
piece of equipment shall be calibrated. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated.
B. Calibrate using the methods described below; alternate methods may be used, if approved by Commissioning Authority and Owner beforehand. See PART 2 for test instrument requirements. Record methods used on the relevant Prefunctional Checklist or other suitable forms, documenting initial, intermediate and final results.
C. All Sensors:
1. Verify that sensor location is appropriate and away from potential causes of erratic operation.
2. Verify that sensors with shielded cable are grounded only at one end.
3. For sensor pairs that are used to determine a temperature or pressure difference, for temperature make sure they are reading within 0.2 degree F of each other, and for pressure, within tolerance equal to 2 percent of the reading, of each other.
4. Tolerances for critical applications may be tighter.
D. Sensors Without Transmitters - Standard Application:
1. Make a reading with a calibrated test instrument within 6 inches of the site sensor.
2. Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrumentmeasured value.
3. If not, install offset, calibrate or replace sensor.
E. Sensors With Transmitters - Standard Application.
1. Disconnect sensor.
2. Connect a signal generator in place of sensor.
3. Connect ammeter in series between transmitter and building automation system control panel.
4. Using manufacturer’s resistance-temperature data, simulate minimum desired temperature.
5. Adjust transmitter potentiometer zero until 4 mA is read by the ammeter.
6. Repeat for the maximum temperature matching 20 mA to the potentiometer span or maximum and verify at the building automation system.
7. Record all values and recalibrate controller as necessary to comply with specified control ramps, reset schedules, proportional relationship, reset relationship and P/I reaction.
8. Reconnect sensor.
9. Make a reading with a calibrated test instrument within 6 inches of the site sensor.
10. Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrumentmeasured value.
11. If not, replace sensor and repeat.
12. For pressure sensors, perform a similar process with a suitable signal generator.
F. Sensor Tolerances for Standard Applications: Plus/minus the following maximums:
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 7 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
1. Watthour, Voltage, Amperage: 1 percent of design.
2. Pressure, Air, Water, Gas: 3 percent of design.
3. Air Temperatures (Outside Air, Space Air, Duct Air): 0.4 degrees F.
4. Relative Humidity: 4 percent of design.
5. Barometric Pressure: 0.1 inch of Hg.
6. Flow Rate, Air: 10 percent of design.
7. Flow Rate, Water: 4 percent of design.
8. AHU Wet Bulb and Dew Point: 2.0 degrees F.
G. Critical Applications: For some applications more rigorous calibration techniques may be required for selected sensors. Describe any such methods used on an attached sheet.
H. Valve/Damper Stroke Setup and Check:
1. For all valve/damper actuator positions checked, verify the actual position against the control system readout.
2. Set pump/fan to normal operating mode.
3. Command valve/damper closed; visually verify that valve/damper is closed and adjust output zero signal as required.
4. Command valve/damper to open; verify position is full open and adjust output signal as required.
5. Command valve/damper to a few intermediate positions.
6. If actual valve/damper position does not reasonably correspond, replace actuator or add pilot positioner (for pneumatics).
I. Isolation Valve or System Valve Leak Check: For valves not associated with coils.
1. With full pressure in the system, command valve closed.
2. Use an ultra-sonic flow meter to detect flow or leakage.
3.6 TEST PROCEDURES – GENERAL
A. Provide skilled technicians to execute starting of equipment and to execute the Functional Tests. Ensure that they are available and present during the agreed upon schedules and for sufficient duration to complete the necessary tests, adjustments and problem-solving.
B. Provide all necessary materials and system modifications required to produce the flows, pressures, temperatures, and conditions necessary to execute the test according to the specified conditions. At completion of the test, return all affected equipment and systems to their pre-test condition.
C. Sampling: Where Functional Testing of fewer than the total number of multiple identical or near-identical items is explicitly permitted, perform sampling as follows:
1. Identical Units: Defined as units with same application and sequence of operation; only minor size or capacity difference.
2. Sampling is not allowed for:
a. Major equipment.
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 8 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
b. Life-safety-critical equipment.
c. Prefunctional Checklist execution.
3. XX = the percent of the group of identical equipment to be included in each sample; defined for specific type of equipment.
4. YY = the percent of the sample that if failed will require another sample to be tested; defined for specific type of equipment.
5. Randomly test at least XX percent of each group of identical equipment, but not less than three units. This constitutes the "first sample."
6. If YY percent of the units in the first sample fail, test another XX percent of the remaining identical units.
7. If YY percent of the units in the second sample fail, test all remaining identical units.
8. If frequent failures occur, resulting in more troubleshooting than testing, the Commissioning Authority may stop the testing and require Contractor to perform and document a checkout of the remaining units prior to continuing testing.
D. Manual Testing: Use hand-held instruments, immediate control system readouts, or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).
E. Simulating Conditions: Artificially create the necessary condition for the purpose of testing the response of a system; for example apply hot air to a space sensor using a hair dryer to see the response in a VAV box.
F. Simulating Signals: Disconnect the sensor and use a signal generator to send an amperage, resistance or pressure to the transducer and control system to simulate the sensor value.
G. Over-Writing Values: Change the sensor value known to the control system in the control system to see the response of the system; for example, change the outside air temperature value from 50 degrees F to 75 degrees F to verify economizer operation.
H. Indirect Indicators: Remote indicators of a response or condition, such as a reading from a control system screen reporting a damper to be 100 percent closed, are considered indirect indicators.
I. Monitoring: Record parameters (flow, current, status, pressure, etc.) of equipment operation using dataloggers or the trending capabilities of the relevant control systems; where monitoring of specific points is called for in Functional Test Procedures:
1. All points that are monitored by the relevant control system shall be trended by Contractor; at the Commissioning Authority’s request, Contractor shall trend up to 20 percent more points than specified at no extra charge.
2. Other points will be monitored by the Commissioning Authority using dataloggers.
3. At the option of the Commissioning Authority, some control system monitoring may be replaced with datalogger monitoring.
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 9 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
4. Provide hard copies of monitored data in columnar format with time down left column and at least 5 columns of point values on same page.
5. Graphical output is desirable and is required for all output if the system can produce it.
6. Monitoring may be used to augment manual testing.
3.7 OPERATION AND MAINTENANCE MANUALS
A. Add design intent documentation furnished by Architect to manuals prior to submission.
B. Submit manuals related to items that were commissioned to Commissioning Authority for review; make changes recommended by Commissioning Authority.
C. Commissioning Authority will add commissioning records to manuals after submission. - END OF SECTION
GENERAL COMMISSIONING REQUIREMENTS 01 91 00 - 10 of 10
SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS
PAGE INTENTIONALLY LEFT BLANK
SECTION 02 41 00 DEMOLITION
DEMOLITION 02 41 00 - 1 of 3
PART 1 GENERAL
A.01 DESCRIPTION
A. This section specifies demolition and removal of buildings, portions of buildings, utilities, pavements, base courses, signage, pavement markings, other structures and debris from trash dumps shown.
B. Includes removal of interior wood and suspended ceiling systems, lighting, raceways, conductors, and attachments to ceiling areas removed.
C. Includes removal of interior floors, foundation coring, exterior pavements, trenching, barricades, patching, coordination, permitting and other work related to installation on new sanitary sewer underground piping and new lateral.
D. Demolition materials shall be removed from site and costs for transportation and removal included in Bid. Including all pavements and base course materials.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 PROTECTION
A. Perform demolition in such a manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.
B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel and aircraft during demolition and removal operations.
C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.
D. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily. Follow City requirements.
E. In addition to previously listed fire and safety rules to be observed in performance of work, include following:
1. No wall or part of wall shall be permitted to fall outwardly from structures.
SECTION 02 41 00 DEMOLITION
DEMOLITION 02 41 00 - 2 of 3
2. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.
3. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 15 feet of fire hydrants.
F. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the site; any damaged items shall be repaired or replaced. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works.
1.04 UTILITY SERVICES
A. Demolish and remove outside utility service lines (water, sewer, storm water, gas, electrical and communications) shown to be removed and as required to install new utility lines and building.
B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.
C. Coordinate removal of utilities with utility companies.
D. Coordinate relocation of mainline sewer and water lines.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
3.01 DEMOLITION
A. Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto. Completely demolish pavements, curbs, walks, pads, irrigation systems, utility boxes, gutters, exterior signage, landscaping, landscape features, fencing and all other site features required to install new building and site elements.
1. As required for installation of new utility service lines.
2. To full depth within an area defined by hypothetical lines located 20 feet outside building lines of new structures.
SECTION 02 41 00 DEMOLITION
DEMOLITION 02 41 00 - 3 of 3
3. As required to install new site/civil components.
B. Debris, including brick, concrete, stone, metals and similar materials shall become the property of Contractor and shall be disposed daily, off the property to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Owner. Contractor shall dispose of debris in compliance with applicable federal, state or local permits, rules and/or regulations.
C. Remove and legally dispose of all materials, other than earth to remain as part of project work. Materials removed shall become the property of the contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations. Materials that are located beneath the surface of the surrounding ground.
D. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Owner. When utility lines are encountered that are not indicated on the drawings, the Owner shall be notified prior to further work in that area.
3.02 CLEAN-UP
A. On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Owner. Clean-up shall include off-site disposal of all items and materials not required to remain property of the Owner as well as all debris and rubbish resulting from demolition operations.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 420 of 1257
SECTION 03 05 00 CONCRETE TESTS AND INSPECTIONS
CONCRETE TESTS AND INSPECTIONS 03 05 00 - 1 of 3
PART 1 GENERAL
1.01 SUMMARY
A. This Section includes the requirements for tests and inspections for site concrete work specified in Sections 03 20 00 Concrete Reinforcement and 03 30 00 Cast in Place Concrete.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit for review and approval.
1. Design Data: Certified copies of mix designers for each concrete class specified
2. Certifications that materials comply with requirements specified.
3. Samples: As requested by the Testing Laboratory and accompanied by certification from vendor that samples originate from and are representative of each lot proposed for use.
4. Test Reports
a. Mill test reports for reinforcement.
b. Reports from testing organization.
1.04 QUALITY ASSURANCE
A. Referenced Standards
1. California Building Code (CBC), 2019.
2. ACI 301 – Specifications for Structural Concrete for Buildings.
3. ACI 318 – Building Code Requirements for Structural Concrete.
4. ASTM C143 / C143M-15a – Standard Test Method for Slump of HydraulicCement Concrete
1.05 DELIVERY, STORAGE AND HANDLING
SECTION 03 05 00 CONCRETE TESTS AND INSPECTIONS
CONCRETE TESTS AND INSPECTIONS 03 05 00 - 2 of 3
A. Owner is responsible for all testing and inspection of concrete work. The owner shall retain the services of a certified testing laboratory to perform concrete testing.
PART 2 PRODUCTS
2.01 REINFORCEMNT
A. The Testing Laboratory
1. Take samples from bundles delivered to job site from the mill, unless bundles are identified by heat number and accompanied by mill certificates. When reinforced is not positively identified by heat numbers or when random sampling is intended two specimens will be taken from each 2 ½ tons or fraction thereof of each size and grade.
2. Test for tensile and bending strength in accordance with CBC Chapters 17 and
19. 2.02 CAST IN PLACE CONCRETE
A. The Testing Laboratory will:
1. Review mix designs, compliance certificates and samples of materials proposed for use.
2. Test and inspect materials according to CBC 1903 from compliance with requirements specified in Section 03 30 00 Cast-in-Place Concrete.
3. Inspect batch plant prior to concrete being furnished to verify that:
a. Plant is equipped with approved metering devices for determining moisture content of fine aggregate.
b. Other plant quality controls are satisfactory.
PART 3 EXECUTION
3.01 CAST-IN-PLACE CONCRETE
A. The Testing Laboratory will:
1. Perform testing in accordance with ACI 318
2. Test concrete slump in accordance with ASTM C143
3. Test concrete for required compressive strength in conformance with CBC Section 1905, as follows.
a. Make and cure a minimum of five specimen cylinders according to ASTM C31 for each 150 cubic yards, or fraction thereof, of each class of concrete placed each day.
SECTION 03 05 00 CONCRETE TESTS AND INSPECTIONS
CONCRETE TESTS AND INSPECTIONS 03 05 00 - 3 of 3
b. As a minimum, one set of five specimen cylinders shall be made for each 5,000 square feet of slab or wall surface area or fraction thereof placed each day
c. Retain one cylinder for 7-day test, one for 14-day test, and two for 28- day test. Hold one or more cylinders for subsequent testing, in necessary.
d. Number each cylinder, date each set of cylinders and record placement represented by each set of cylinders.
e. Transport specimen cylinders from jobsite to laboratory. f. Test specimen cylinders according to ASTM C30 from specified strength after cylinders have aged for 7 days, 14 days, and 28 days.
B. Furnish to the Testing Laboratory the ready-mix delivery tickets for each batch of concrete delivered to the jobsite, each ticket bearing the following:
1. Design mix number
2. Time of batching
3. Weight of cement, type and maximum size of aggregates, water, and admixtures in each batch.
4. Total volume of concrete in each batch.
C. When laboratory tests of specimen cylinders show compressive strengths below the minimum specified, the Contractor will be back charged for costs of the taking and testing core specimens of hardened concrete according to ASTM C42.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 424 of 1257
SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 1 of 4
PART 1 GENERAL
1.01 SUMMARY
A. This section includes the requirements for furnishing and placing concrete formwork.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 QUALITY ASSURANCE
A. Referenced Standards
1. California Building Code (CBC), 2019
2. ACI 301 – Specifications for Structural Concrete for Buildings.
3. ACI 318 – Building Code Requirements for Reinforced Concrete
4. ACI 347R – Guide to Formwork for Concrete.
5. CRSI Manual of Standard Practice
6. PSI-95 US Product Standard for Construction and Industrial Plywood
7. West Coast Lumber Inspection Bureau (WCLB) Standard.
8. Western Wood Products Association (WWPA) Publication: Western Lumber Grading Rules.
B. Design Criteria: Unless otherwise shown, noted, or specified, formwork shall be in conformance with ACI 347
1.04 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle materials subject to damage from dirt and moisture maintaining them clean and dry, off the ground, and suitably protected.
SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 2 of 4
PART 2 PRODUCTS
2.01 MATERIALS
A. General: Form materials shall be new at start of work.
B. Form Lumber: Douglas Fir, Construction Grade, S1S2E
C. Plywood Forms and Architectural Smooth Finish: Five-ply, 3/4-inch thick, APA A-A Plyform, Class I, Exterior Type, with mill-oiling treatment omitted for architecture smooth finish; or Owner approved equal.
D. Flexible spring steel forms or laminated boards for forming radius bends.
E. Form Accessories:
1. Accessories which will be entirely or partially embedded in concrete, such as ties and hangers, shall be of metal and of standard manufacture; wire ties are not acceptable.
2. The portion of embedded accessories remaining in concrete shall have no metal within one inch of face of concrete, and shall have no fractures, spalls, depressions, or other surface disfigurations exceeding 3/4 inch in diameter.
3. Spreader cones on ties shall not exceed one inch in diameter.
F. Form Sealer: Sealer shall eliminate grain raise as a result of moisture, and shall not interfere with color, bond, or subsequent treatment of or application of finishes to concrete surface; Sonneborn Building Products, Inc. "Form Saver," Grace Construction Materials "Form Film," Burke "Form Sealer," or approved equal.
G. Form Release Agents:
1. For Concrete Exposed to View in the Finished Work or to Receive Applied Finishes: Use chemically-active types producing water-insoluble soaps. Release agents shall contain no petroleum-based solvents such as creosote, paraffin, wax, or diesel oil.
2. For ABS form liners, use only form release agents recommended by form liner manufacturer.
3. For Unexposed Concrete: Any type that will not interfere with bond of finishes to be applied.
PART 3 EXECUTION
3.01 PREPARATION
A. Treat contact surface of plywood and board forms with a form sealer in accordance with the manufacturer's printed instructions.
B. Clean form surfaces and reseal before each use. The use of form oil will not be permitted.
SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 3 of 4
3.02 CONSTRUCTION
A. Design, construct, and brace formwork and temporary falsework to safely support concrete and hold personnel during construction operations.
B. Coordinate design, construction, and installation of formwork to accommodate openings, sleeves, chases, pipes, nailers, anchors, ties, inserts, and other embedded items.
C. Construct forms of sufficient strength and rigidity to produce finished concrete of the size, shape, and location shown, without exceeding specified tolerances. Form assembly shall permit removal in proper sequence without damaging concrete.
D. Use only new plywood form material for creating smooth architectural finish where required; reuse of forms not permitted for creating smooth architectural finish.
E. Install form liners for architectural finishes in strict accordance with manufacturer’s printed instructions and approved submittal.
F. Arrange forms to permit single pours of exposed areas and panels without joints between adjacent form materials in the same plane.
G. Construct forms for all exposed to view concrete full height and width between construction joints in surface of concrete. Do not break forms for pour or construction joints within such areas.
H. Forms shall not extend higher than 12 inches above the top of a pour or construction joint.
I. Form construction joints as specified in Section 03 30 00 – Cast-In-Place Concrete.
Provide a surfaced pouring strip where construction joints intersect faces of surfaces to be exposed to view in the finished work; prior to subsequent pour, remove strip and tighten forms.
J. Construction joints shall show no overlapping or offsetting of concrete surfaces and shall as closely as possible have the same appearance as butted board joints. Joints in a continuous line shall be straight and true.
K. Provide cleanouts as required to permit inspection and thorough cleaning of loose dirt and debris. Cleanouts shall not be apparent on concrete surfaces exposed to view in finished work.
L. Arrange forms to permit proper erection sequence and subsequent form removal without damaging concrete.
M. Whenever concrete bases and foundations are required for equipment furnished as part of the work of other Sections, verify equipment dimensions prior to placing concrete.
N. Forms for concrete surfaces exposed to view in the finished work shall be constructed to match existing concrete finish.
O. Forms for unexposed concrete surfaces shall be undressed lumber, form plywood, or other suitable material.
P. Formwork shall be clean and free of foreign material when concrete is placed.
SECTION 03 11 13 CONCRETE FORMWORK
CONCRETE FORMWORK 03 11 13 - 4 of 4
3.03 FORM REMOVAL
A. Do not remove forms until concrete has attained sufficient strength to support its own weight and anticipated construction live loads without damage, but in no case less than the following.
1. Walls: Four (4) days
2. Footings, Curbs, Walks, Paving: Side forms may be removed 24 hours after concrete placement.
END OF SECTION
SECTION 03 20 00 CONCRETE REINFORCEMENT
CONCRETE REINFORCEMENT 03 20 00 - 1 of 3
PART 1 GENERAL
1.01 SUMMARY
A. This section includes the requirements for furnishing and installing concrete reinforcement.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Shop Drawings: Complete bending and placing details of reinforcement.
1. Details of reinforcement not shown on Drawings shall be in conformance with ACI 315 and ACI 318.
2. Detailing, fabricating and spacing of reinforcement shall be in conformance with ACI 315 unless otherwise shown or noted.
B. Test Reports: Certified copies of mill tests showing chemical and physical analyses of each heat or melt from which reinforcement was made.
1.04 QUALITY ASSURANCE
A. Referenced Standards
1. California Building Code (CBC), 2019.
2. ACI 301 – Specifications for Structural Concrete for Buildings
3. ACI 318 – Building Code Requirements for Reinforced Concrete
4. ACI 347R – Guide to Formwork for Concrete
5. CRSI Manual of Standard Practice
B. Allowable Tolerances Fabricating/placing tolerances shall be in conformance with ACI 301.
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver reinforcement from the mill in securely tied bundles, each bundle limited to one size and grade of reinforcement. Identify each bundle with readily visible metal or plastic tags identifying the reinforcement by the same item marking as on the approved shop
SECTION 03 20 00 CONCRETE REINFORCEMENT
CONCRETE REINFORCEMENT 03 20 00 - 2 of 3
drawings; tags shall also identify the mill, heat or melt number, and the grade and size of reinforcement.
B. After bundles are broken, identify by segregating reinforcement by sizes and grades.
C. Store reinforcement off the ground, protected from the elements and foreign material which could adversely affect its bond with concrete.
PART 2 PRODUCTS
2.01 MATERIALS
A. Reinforcing Bars: ASTM A625, Grade 60 for all bars except where noted otherwise on plans.
B. Wire for Ties, Stirrups, and Spiral Reinforcement: ASTM A82.
C. Spacers, Bar Supports, and Other Accessories: In conformance with ACI 315. Where portions of accessories will be within 1/2 inch of concrete surfaces which will be exposed to the elements in the finished work, such accessories shall be of non-corrosive material or shall be corrosion-resistant treated; aluminum products will not be acceptable.
2.02 FABRICATION
A. Fabricate reinforcement in accordance with the requirements of ACI 315, where specific details are not shown or where Contract Documents are not more restrictive.
B. Fabrication of reinforcement shall begin only after approval of bar lists and shop drawings, with each item of reinforcement fabricated in conformance with such approved documents.
C. Bend reinforcing steel cold; do not straighten/rebend, doing damage to the material.
PART 3 EXECUTION
3.01 INSTALLATION
A. At time of concrete placement, reinforcement shall be free of dirt, oil, scale, loose rust, and other foreign material that could adversely affect the bond with concrete.
B. Fasten reinforcement/support to prevent displacement beyond the tolerances specified in ACI 301, by construction loads and concrete placement. Sizes and dimensions of supports shall be as required to position the reinforcement as shown on the approved shop drawings and in conformance with the minimum concrete protective covering requirements of ACI 301.
C. Furnish reinforcing bars full length whenever possible; splices will be permitted only where shown or noted on the approved shop drawings, or as otherwise permitted by the Owner.
D. Splices may be made in horizontal reinforcement by lapping and placing ends of bars in contact and securely wiring; or bars may be separated sufficiently to permit the embedment of the entire surface of each bar in concrete.
SECTION 03 20 00 CONCRETE REINFORCEMENT
CONCRETE REINFORCEMENT 03 20 00 - 3 of 3
1. Locate all splices as per drawings. Lap bars 48 diameters minimum.
2. Stagger splices in adjacent bars.
E. Obstructions: Should items to be embedded in concrete interfere with placement of reinforcements, notify the Owner to obtain written approval of procedure before starting.
F. Concrete Cover: Install reinforcement to achieve the minimum concrete coverage shown or noted on the Drawings, unless otherwise specified.
G. Welding: Reinforcing bars shall not have welded joints.
H. Misplaced Reinforcing Bars:
1. If reinforcing bars are found to be misplaced after concrete placement, immediately notify the Owner for recommendations for correcting the misplacement; perform no corrective measures without such prior recommendations.
2. Redesign, alterations, corrections, and replacement of concrete or reinforcing bars due to misplaced bars shall be performed at no additional expense to the Owner.
3.02 MAINTENANCE OF REINFORCEMENT
A. Continuously inspect/maintain reinforcement in proper position during concreting operations.
B. Where reinforcement cannot otherwise be kept properly aligned, provide additional bracing ties, stirrups, and other items as necessary.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 432 of 1257
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 1 of 8
PART 1 GENERAL
1.01 SUMMARY
A. This Section includes the requirements for furnishing and placing cast-in-place concrete, including cast-in-place architectural finish concrete, curing and finishing.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
SUBMITTALS
B. Mix design for each class of concrete proposed for use. If concrete will be pneumatically placed, mixes shall be specifically designed and designated.
C. Laboratory test reports for concrete mixes. Compression test data (field experience method) or results of testing (trial batch method) used to establish mix proportions.
D. Product Data: Manufacturers' and suppliers' proprietary information on materials.
E. Layout Drawings: Submit layout drawings showing proposed locations of construction joints, control joints, details of construction, and connections for approval prior to concrete placement.
F. Submit delivery ticket to Owner for each batch of concrete delivered.
1.03 QUALITY ASSURANCE
A. Reference Standards
1. California Building Code (CBC), 2016.
2. ACI 301 – Specifications for structural Concrete for Buildings.
3. ACI 318 – Building Code Requirements for Reinforced Concrete.
B. Quality Control: Contractor to retain the services of a qualified testing organization as specified in Testing Laboratory Services.
C. Quality Control Supervisor: Owner will retain the services of an independent concrete contractor that will observe Contractor’s work to achieve desired results.
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 2 of 8
D. Allowable Tolerances: Deviation from plumb and level shall not exceed 1/8 inch within ten feet in any direction, as determined with a ten-foot straightedge. Cumulative deviation over the length or height of the building shall not exceed 3/8 inch in any direction.
1.04 DELIVERY, STORAGE AND HANDLING
A. Deliver, store, and handle packaged materials in the manufacturers' original, sealed packages, each clearly identified with the manufacturer's name, and name and type of material.
B. Deliver, store, and handle materials subject to damage from dirt and moisture maintaining them clean and dry, off the ground, and suitably protected.
C. Store coarse and fine aggregates in separate, covered bins to prevent them from mixing, and to preserve moisture content of aggregate at batch plant.
D. Store bulk cement in covered bins.
1.05 PROJECT CONDITIONS
A. Environmental Requirements for Concrete Placement:
1. Hot Weather: In conformance with ACI 305.
2. Cold Weather: In conformance with ACI 306.
3. During Precipitation: Do not place unless adequate protection is provided.
PART 2 PRODUCTS
2.01 MATERIALS
A. Concrete, ready-mixed, ASTM C94.
1. Cement: ASTM C150, Type II, Portland Cement.
2. Aggregate:
a. Fine Aggregate: ASTM C33
b. Coarse Aggregate: ASTM C33
c. Source of aggregate shall remain constant for the duration of the work.
3. Water: Clean, clear, and potable.
B. Curing materials:
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 3 of 8
1. Liquid Membrane: ASTM C308, Type I.
2. Sheet material: ASTM C171.
C. Admixtures
1. Water reducing Admixture: ASTM C494, only with prior review of mix design.
2. Air-Entraining Admixture: ASTM C260, for lightweight concrete only with prior review of mix design.
3. Unspecified Admixtures: Not Permitted.
4. Calcium Chloride: not Permitted.
5. Hydrogen Chloride: Not Permitted
D. Non-shrink Grout: Premixed, requiring only addition of specified water; Master Builders "Masterflow 928," or approved equal.
1. Flowable, low shrinkage, 5,000 psi at 7 days.
2. Non-metallic Type: For all uses.
3. Metalic Type: Will not be permitted.
E. Bonding Agent: Larsen Products Corp. "Weld-Crete," Sika Chemical Corp. "Sikastix 370" or "Sikadur Hi-Mod," or approved equal.
F. Hardener: Clear, dust-on type; Sonneborn-Contech "Harcol Standard Natural," Upco Co. "Hydroment," Lambert Corp. "Colorhard," or approved equal.
G. Sealer: Heavy penetrating type, from same manufacturer as hardener.
1. Without wax or other constituent that will impair application of finishes.
H. Epoxy Grout for Reinforcement and Bolt Installation: Hilti "HIT-RE 500-SD” Adhesive Anchor System", Simpson Strong-Tie “SET XP”, or equal.
I. Detectable Warning - Truncated Domes & Nosing:
1. Spacing, height and configuration of truncated domes shall meet CBC 11B-705.
Base diameter of 0.9 inch min. and 0.92 inch max, a top diameter of 0.45 inch minimum and 0.47 inch maximum, and a height of 0.2 inch. Dome spacing shall have center to center 2.3 inch min. and 2.4 inch max., and a base-to-base spacing of 0.65 inch minimum.
2. Amstep Model 224A, 2-3/8 inches wide, and meets the California Title 24 code for the visually impaired. Tread 5/16 inch thick with continuous arrow profile anchor 5/8 inch deep. The abrasive filler shall consist of a mixture of aluminum
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 4 of 8
oxide and silicon granules in an epoxy resin and hardener mixture and locked into an extruded base, alloy 6063-T6. Coefficient of friction 1.02 dry, 0.98 wet per ASTM F 609. Abrasive filler color as selected.
2.02 MIXES
A. Design Criteria
1. Concrete shall develop the minimum compressive strength noted on the Contract Documents at 28 days on cylinders made and tested in accordance with referenced ASTM standards.
2. The average of the sets of three consecutive strength tests shall be equal to or greater than the specified strength, and no individual strength test results shall fall below the specified strength by more than 500 psi.
B. General
1. Mix designs shall be in conformance with CBC Section 1905, based on materials tested and approved by the Testing Laboratory.
2. If concrete will be pneumatically placed, mixes shall be specifically so designed and designated.
3. If concrete is to be pumped, mixes shall be specifically so designed and designated.
C. Nonshrink Grout: Mix in accordance with the manufacturer’s printed instructions.
D. Dry Pack: Mix, in proportions by volume, one-part cement to two-and-one-half parts fine aggregate, screening out materials retained on a No. 4 sieve. Mix with water to a consistency so that when a ball of mixture is compressed in the hand, it will show finger marks but maintain its shape and not show any surface water.
E. Patching Mortar: Mix in proportion by volume, one part cement to two parts fine aggregate.
2.03 MIXING
A. Batch Plant:
1. Equipment and plant shall be capable of weighing, segregating, and efficiently handling materials. Automatic metering capable of determining moisture content of sand shall be utilized.
2. Equipment and plant shall be subject to the approval of the Testing Laboratory; equipment and processes not so approved shall not be used for the work.
B. General:
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 5 of 8
1. Mixing shall be in conformance with ASTM C94 and CBC.
2. Mix cement, fine and coarse aggregate, admixtures, and water to exact proportions of approved mix designs.
3. Measure fine and coarse aggregates separately according to approved method which affords accurate control and checking.
4. Adjust grading to improve workability; do not add water unless otherwise recommended by the Owner.
C. Admixtures: use automatic metering dispenser to incorporate admixtures into mix
2.04 CONCRETE CLASSES
A. Definitions:
1. Strength: Minimum compressive strength after 28 days, when tested in accordance with ASTM C39.
2. Aggregate: Maximum size.
3. Weight: Pounds per cubic foot, air dry.
4. Slump: When tested in accordance with ASTM C143.
5. Maximum water/ cement ratio of 0.45
B. Concrete Classes and Uses:
Class Weight (psf) Strength (psi) Aggregate
(inches)
Use
A
B
145
110
4000
3000
3/4
5/8
Cast-In-Place Concrete,
Concrete Foundations,
Concrete Slabs, etc.
Sand Lightweight Concrete
over metal deck
PART 3 EXECUTION
3.01 PREPARATION
A. Prior to concrete placement, determine finishes required to accommodate the work of other sections, and prepare for such finishes. Where determination for such finishes may be in question, refer to Owner for resolution.
B. Remove loose dirt/foreign material from excavations and forms and standing and saturated soil from excavations and cavities. Placing concrete in standing water is not permitted.
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 6 of 8
C. Thoroughly clean reinforcement and other items to be embedded in concrete of loose rust and other foreign matter which could inhibit bond with concrete.
D. Thoroughly wet wood forms, except coated plywood, and adjacent concrete a minimum of one hour prior to placing concrete; securely close cleanout and inspection ports; repeat wetting as required to keep forms damp.
E. Work form release agent into all areas of form liner as recommended by form manufacturer.
F. Apply form release agent to form liners before each use and within the same day that concrete is placed.
G. Subgrade and forms shall have been checked for line and grade, and work areas shall have been inspected by Engineer and observed by the Owner prior to starting concrete placement.
H. Roughen surfaces +/- ¼” amplitude at all joints and at all contact surfaces between new and existing concrete. Provide shear keys and prepare joints as per Drawings and Specifications. Apply bonding agent between existing and new concrete pours.
3.02 TRANSPORTING
A. Transport concrete from the mixer to the place of final deposit as quickly as possible, and by methods which prevent the separation and loss of ingredients. Concrete shall be of uniform density when placed.
B. Concrete shall not be freely dropped where reinforcement will cause segregation. Spouts, elephant trunks, or other approved means shall be utilized to prevent segregation.
C. In no case shall concrete be freely dropped more than six (6) feet. Provide formwork with pour ports at four (4) feet or closer horizontally so that concrete will be deposited freely such that no more than six (6) feet is dropped at any location.
D. Concrete may be pumped from the mixer to the place of deposit, provided that information on mix design adjustments, equipment, and procedures have received the Owner’s written approval.
3.03 PLACING
A. General:
1. Notify Owner a minimum of 72 hours prior to each major concrete placement.
2. Place concrete in a continuous operation until a section of approved size and shape has been completed.
3. For horizontal surfaces, maintain a plastic surface essentially horizontal until completion of placement of the section.
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 7 of 8
4. Prevent displacement of reinforcement and other items to be embedded.
5. Before concrete sets, completely remove concrete spilled on forms and reinforcement in sections where concrete is not to be immediately installed.
6. An interruption of more than 60 minutes in concrete placement will be cause for shutting down the work and disposing of remaining mixed concrete. If such interruption occurs, provide construction joints where and as instructed, and cut concrete back to such line, cleaning forms and reinforcement as specified.
7. Record the date and time of concrete placement in each section. Retain records until completion of the work and make available at all times to the review of the Owner.
B. Consolidation:
1. Thoroughly consolidate concrete by puddling with suitable tools during placement, and by thoroughly working around reinforcement and other embedded items.
2. In addition to manual spading and tamping, internally vibrate concrete with highspeed mechanical vibrators of sufficient amplitude for thorough consolidation.
3. Prevent formation of shoulders and ledges.
4. Provide keys across vertical joints as shown on drawings. Place dowels across joints.
5. Joints for Slabs on Grade: Locate construction joints where approved and under partitions, whenever possible.
3.04 PROTECTION AND CURING
A. Protection:
1. Maintain concrete temperature above 50 degrees F during curing.
2. Protect concrete from sun and rain.
3. Do not subject concrete to loads until it has completely cured and attained minimum 28-day strength.
4. Water cure concrete continuously for minimum duration specified, including Saturdays, Sundays, and holidays; do not permit it to dry out until it has cured for the specified time.
5. Protect concrete during/after curing from damage from construction operations.
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 8 of 8
6. Cover traffic areas with kraft paper and plywood sheets; maintain protective covering in place and in good repair as long as necessary to protect concrete from damage.
7. Keep finished areas free from traffic for a minimum of four days, or as long as necessary for concrete to have set sufficiently to prevent its being damaged.
B. Curing: Curing shall immediately follow finishing and shall be performed as follows.
1. Flatwork Surfaces: Membrane cure for a minimum of seven days.
3.05 DEFECTIVE CONCRETE
A. Repair or replace defective concrete as instructed by Owner, and at no additional expense to Owner. Repair materials shall include, as necessary, cements, aggregates, admixtures, and epoxy.
B. With written approval of Owner, some minor defective work may be repaired by use of cement mortar; however, if the defects affect the strength of the structure, its appearance, or are otherwise detrimental, Owner may require the removal and replacement of that portion of the structure.
END OF SECTION
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 1 of 7
PART 1 GENERAL
1.1 DESCRIPTION
A. This section specifies the requirements for materials, proportioning, and application of shotcrete using either dry-mix or wet-mix process.
1.2 DEFINITION
A. Mortar or concrete pneumatically projected at high velocity onto a surface; also known as air-blown mortar; also pneumatically applied mortar or concrete, sprayed mortar and gunned concrete.
1.3 RELATED WORK
A. All Sections listed in the Table of Contents are a Condition of this Section.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Design Mix: Test Reports and Proportions.
C. Shop Drawings: Reinforcing Steel.
D. Two 300 mm x 300 mm x 25 mm (12 inch by 12 inch by 1 inch) sample panels showing required finish. Submit panels within 30 days after receipt of notice to proceed.
E. Aggregate gradation.
F. Certificates: Contractor's qualifications as specified.
1.5 QUALITY CONTROL
A. Contractor Qualifications.
1. Work in this section shall be provided only by a Contractor specializing in and possessing the equipment, knowledge, and skilled operators for application of shotcrete.
2. Furnish evidence to Resident Engineer that Contractor conforms to above requirements, has been specializing in this work for a period of at least five years, and will use only experienced shotcrete foremen, nozzlemen and delivery equipment operators on the work.
3. Conform to ACI 506R, Paragraphs 4.2 and 4.3, for qualifications and duties of craftsmen.
B. Tolerances:
1. Cover of reinforcement: ACI 506.2, Paragraph 3.6.2.
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 2 of 7
2. Alignment and thickness of shotcrete shall be controlled by installing ground wires. Alignment and thickness control shall conform to ACI 506R Section 5.6.
1.6 PRECONSTRUCTION TESTING
A. Conform to the requirements of ACI 506R, Paragraph 6.4.
B. Testing laboratory approved by the Resident Engineer and reimbursed by Contractor shall design dry or wet mix, as applicable, to produce compressive strengths indicated on drawings.
C. Make 2 test panels for each mix design, 450 mm (18 inches) square and 75 mm (3 inch) minimum thickness. Take 5 cores or cubes from each 75 mm (3 inch) panel for compressive strength testing in accordance with ACI 506R, Paragraph 6.4.
1.7 CONSTRUCTION TESTING
A. Make one test panel 450 mm (18 inches) square and 75 mm (3 inches) thick for each half-day's work or portion thereof. Provide test panels to a testing laboratory approved by Resident Engineer and reimbursed by the contractor. Five compressive strength specimens will be obtained from each panel and tested for compressive strength in accordance with ASTMC42. Two (2) samples are to be tested at 7 days and 28 days after application. The fifth sample should be retained for 56 days should additional testing be required. Strength test results are to be reported to the Resident Engineer 24 hours after completion of test.
1.8 DELIVERY, HANDLING, AND STORAGE
A. Properly deliver and handle materials to prevent contamination, segregation, or damage to materials.
B. Store cement in weathertight enclosures to protect against dampness and contamination.
C. Prevent segregation and contamination of aggregates by proper arrangement and use of stockpiles.
D. Store admixtures properly to prevent contamination, evaporation, freezing, or other damage.
1.9 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to extent referenced.
Publications are referenced in text by basic designation only.
B. American Concrete Institute (ACI):
304R-00(2009) Guide for Measuring, Mixing, Transporting, & Placing Concrete 506R-05 Guide to Shotcrete
506.2-95 Specification for Shotcrete
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 3 of 7
506.4R(R2004) Guide for the Evaluation of Shotcrete
C. American Society for Testing and Materials (ASTM):
A615/A615M-09 Deformed and Plain Carbon Steel Bars for Concrete Reinforcement
A1064/A1064M Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
C33/C33M-11 Concrete Aggregates
C94/C94M-10 Ready-Mixed Concrete
C150/C150M-09 Portland Cement
C260/C260M-10 Air-Entraining Admixtures for Concrete
C494/C494-10 Chemical Admixtures for Concrete
PART 2 PRODUCTS
2.1 MATERIALS
A. Portland Cement: ASTM C150, Type I or II.
B. Aggregate: ASTM C33, Gradation Table 2.1
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 4 of 7
TABLE 2.1 -- GRADATION LIMIT FOR COMBINED AGGREGATES
Sieve Size, U.S.
standard square
mesh
Percent by Weight Passing Individual Sieves
Gradation No. 1 Gradation No. 2 Gradation No. 3
20 mm 3/4 inch --- --- 100
13 mm 1/2 inch --- 100 80-95
10 mm 3/8 inch 100 90-100 70-90
No. 4 95-100 70-85 50-70
No. 8 80-100 50-70 35-55
No. 16 50-85 35-55 20-40
No. 30 25-60 20-35 10-30
No. 50 10-30 8-20 5-17
No. 100 2-10 2-10 2-10
C. Chemical Admixtures: ASTM C494.
D. Air-entraining Admixture: ASTM C260.
E. Water: Fresh, Clean, and Potable
F. Reinforcing Steel: ASTM A615, grade as shown.
G. Welded Wire Fabric: ASTM A1064/A1064M.
PART 3 EXECUTION
3.1 PROPORTIONING, DELIVERY AND MIXING
A. Proportioning: Mix shall be designed by Contractor-retained testing laboratory; see "PRECONSTRUCTION TESTING" hereinbefore. Maintain water-cement ratio between
0.35 to 0.50 by weight.
B. Mixing Processes:
1. Mixing, General: Strength of mix is specified on the drawings. At Contractor's option, use either the dry or wet mix process. Discharge entire batch before recharging. Clean mixer at least once every 8-hour shift or portion thereof.
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 5 of 7
Reject material mixed and standing for 45 minutes; remixing or tempering not permitted.
2. Dry Mix Process: Conform to ACI 506R, Paragraph 1.6.1.
3. Wet Mix Process: Conform to ACI 506R, Paragraph 1.6.2.
3.2 EQUIPMENT, DRY MIX PROCESS
A. Batching and Mixing Equipment: Batch by weighing, use rotating mixer or adequate capacity for dry-mixing aggregate and cement for continuous supply of material to gun, all conforming to ACI 506R, Paragraph 3.5.
B. Delivery equipment:
1. Gun and Nozzle: Premixing type conforming to the requirements of ACI 506R, Paragraphs 3.2 and 3.7 designed for material delivery and water injection.
2. Air Compressor and Hoses: Standard type, of capacity to provide without interruption, pressures and volume of air necessary for longest hose delivery; conform to ACI 506R, Table 3.1. Make allowances for air consumed by separate blow pipe in blowing away rebound, cleaning reinforcing and incidental uses.
3. Water Supply: Conform to ACI 506R, Paragraph 3.8.1 with adequate capacity to maintain water pressure approximately 65 N (15 pounds) higher than highest air pressure required, both air and water pressure uniformly steady, non-pulsating.
3.3 EQUIPMENT, WET MIX PROCESS
A. Batching and Mixing Equipment: ACI 506R, Paragraph 3.5. Batch by weighing; use rotating mixing equipment and mix in accordance with ACI 304R, and ASTM C94 for ready-mixed concrete.
B. Delivery Equipment: Use pneumatic feed or positive displacement type of design and size capable of delivering premixed materials accurately, uniformly and continuously through the hose, all in accordance with ACI 506R, Paragraphs 3.3 and 3.7.
C. Air Supply: ACI 506R, Paragraph 3.4.2.
3.4 ALIGNMENT CONTROL
A. General: To establish thickness and surface planes or shotcrete build-up provide ground wires, taut, secure, true to line and plane, conforming to ACI 506R, Paragraph 5.6.
B. Reinforcing Positioning: Check that reinforcing is positioned and sized all in accordance with ACI 506R, Paragraph 5.4.
3.5 EXHAUST SYSTEM
A. Construct a sealed air barrier around immediate area of work as approved by Resident Engineer. Construct a sealed air barrier prior to any application within confines of the Medical Center.
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 6 of 7
B. Continuously exhaust work area to outside creating a negative pressure within area. Do not locate air exhaust near any Medical Center air intakes.
3.6 SHOOTING
A. General: ACI 506R, Paragraph 8.5.7. Shoot and fill corners first, with continuous uniform material flow from nozzle held approximately 600 mm to 1500 mm (2 to 5 feet) from the work, at angle normal to the surface.
1. Shoot around reinforcing with nozzle close to encase reinforcement as illustrated in ACI 506R, Figure 8.4, left column.
2. If flow is not uniform and slugs, sand spots or wet sloughs result, turn nozzle away until faulty work is cut out and repaired.
3. Do no shotcrete work if temperature is below 40 C (40 0 F) without providing continuous heat and adequate protection from freezing.
B. Preparation of Surfaces to Receive Shotcrete: ACI 506R, Paragraph 5.2, as applicable to the work, as approved.
C. Rebound: ACI 506R, Paragraph 8.5.10. Do not work rebound into construction nor salvage rebound for subsequent batching.
D. Suspend application if:
1. High wind prevents nozzlemen from proper application of material.
2. Weather approaches freezing and shotcrete cannot be protected.
3. Rain, other than a very light sprinkle, occurs which would wash cement out of freshly placed material.
E. Time Between Coats:
1. In sloping, vertical or overhanging work, allow interval of time sufficient for initial, but not final, set to develop.
2. At development of initial set, lightly broom surface to remove any laitance to provide better bond with succeeding applications.
F. Construction Joints:
1. ACI 506R, Paragraph 5.7, tapering over a width of 300 mm (1 foot) to a 25 mm (1 inch) edge from board laid flat.
2. Before proceeding with additional shotcrete work, thoroughly clean joint and adjacent shotcrete, then wet and scour surfaces with air jet.
G. Warm Weather Application: Prevent dry-out resulting in cracking and separation by keeping surfaces continuously moist and/or covered with continuously moistened burlap for 7 days after shotcreteing.
SECTION 03 37 13 SHOTCRETE
SHOTCRETE 03 37 13 - 7 of 7
H. Surface Finish: Bring final surfaces of shotcrete to an even plane, well formed corners either square or to radius shown, working up to ground wires using somewhat lower placing velocity than normal.
1. Remove ground wires to 20 mm (3/4 inch) back from surface and fill holes with shotcrete to adjacent surface elevations.
2. Wood float surfaces to provide a smooth true finish.
3.7 CURING
A. ACI 506.2, Paragraph 3.7.
3.8 HOT WEATHER SHOTCRETING
A. ACI 506R, Paragraph 8.8.
3.9 COLD WEATHER SHOTCRETING
A. ACI 506R, Paragraph 8.9.
3.10 PROTECTION AND CLEAN-UP
A. Protection: Protect adjacent walls, windows, doors, other building surfaces, grounds and/or shrubs and property of others from damage by shotcreteing, rebound and dust.
1. Construct a sealed dust partition to confine rebound and dust to the immediate work area. Dust partitions shall be integral with exhaust system. A negative air pressure shall be maintained within partitioned area during shotcrete applications to prevent dust leakage beyond area.
2. Immediately clean all shotcrete materials and remove all rebound from site.
B. Clean-up: Continuously remove rebound material to ensure that base, intermediate, and finish surfaces are clean and ready for bonding layers.
3.11 DEFECTIVE WORK
A. General work will be evaluated by the Resident Engineer or designated agent in accordance with ACI 506.4. If the evaluation reveals unbonded work or cores fail to meet specified strengths, or finishes are unsatisfactory, repair such defective work, as approved, without additional cost to the Owner.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 448 of 1257
SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 1 of 5
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. This Section includes a self-leveling underlayment that consists of a blend of Portland cement and other hydraulic cements and polymers that is used to level and smooth interior concrete, terrazzo, well-bonded ceramic & quarry tile, epoxy coating systems, wood, metal and properly prepared, non-water-soluble adhesive residue on concrete prior to the installation of finish flooring on all grade levels.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 REFERENCES
A. ASTM C109M, Compressive Strength Air-Cure Only
B. ASTM C348, Flexural Strength of Hydraulic-Cement Mortars C. ASTM F2170, Relative Humidity in Concrete Floor Slabs Using in situ Probes D. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
1.04 SUBMITTALS
A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used. Include manufacturer’s Safety Data Sheets.
B. Qualification Data: For Installer
1.05 QUALITY ASSURANCE
A. Installation of the product must be completed by a factory-trained applicator using mixing equipment and tools approved by the manufacturer.
B. Product must have a hydraulic cement-based inorganic binder content as the primary binder which includes portland cement per ASTM C150: Standard Specification for Portland Cement and other specialty hydraulic cements. Gypsum-based products are not acceptable.
SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 2 of 5
C. Manufacturer Experience: Provide products of this section by companies which have successfully specialized in production of this type of work for not less than 10 years.
Contact Manufacturer Representative prior to installation.
1.06 WARRANTY
A. Contact Manufacturer for comprehensive warranty, depending on the system installed.
1.07 DELIVERY, STORAGE AND HANDLING
A. Deliver products in original packaging, labeled with product identification, manufacturer, batch number and shelf life.
B. Store products in a dry area with temperature maintained between 50° and 85°F (10° and 29°C) and protect from direct sunlight.
C. Handle products in accordance with manufacturer's printed recommendations.
1.08 CONDITIONS
A. Do not install material below 50°F (10°C) surface and air temperatures. These temperatures must also be maintained during and for 48 hours after the installation of products included in this section. Install quickly if the substrate is warm and follow warm weather instructions per Manufacturer’s instructions.
PART 2 PRODUCTS
2.01 MATERIAL
A. Hydraulic Cement-Based Self-Leveling Underlayment
1. Basis-of-Design Products or approved equal:
a. ARDEX K 15; Manufactured by ARDEX AMERICAS, USA, (724) 203-5000, www.ardexamericas.com
i. Primer:
1) Standard Absorbent Concrete: ARDEX P 51 Primer
2) Extremely Absorbent Concrete: May require two
applications of ARDEX P 51 to minimize the potential
for pinholes forming in the ARDEX K 15.
3) Wood: ARDEX P 82 Ultra Prime
4) Metal: ARDEX EP 2000 Substrate Preparation Epoxy
Primer
5) Other Non-Porous Substrates (burnished concrete,
terrazzo, well- bonded ceramic, quarry and porcelain
tiles, epoxy coating systems and non-water soluble
adhesive residue on concrete and concrete treated with
SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 3 of 5
silicate compounds): ARDEX P 82 Ultra Prime
ii. Performance and Physical Properties: Meet or exceed the following values for material cured at 73° F+/-3°F (23° C+/-3°C) and 50% +/-5% relative humidity:
1) Application: Barrel Mix or Pump
2) Flow Time: 10 minutes
3) Walkable: 2 to 3 hours
4) Compressive Strength: 5,500 psi (385 kg/cm2) at 28
days, ASTM C109M
5) Flexural Strength: 1,200 psi (84 kg/cm2) at 28 days, ASTM C348
6) VOC: 0
2.02 WATER
A. Water shall be clean, potable, and sufficiently cool (not warmer than 70°F).
PART 3 EXECUTION
3.01 PREPARATION
A. General: Prepare substrate in accordance with manufacturer’s instructions.
1. Concrete:
a. Prior to proceeding please refer to ASTM F710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring. All concrete subfloors must be sound, solid, clean, and free of all oil, grease, dirt, curing compounds and any substance that might act as a bond breaker before priming. Mechanically clean if necessary using shot blasting or other. Acid etching and the use of sweeping compounds and solvents are not acceptable.
b. Substrates shall be inspected in accordance with ASTM F2170 and corrected for moisture or any other conditions that could affect the performance of the underlayment or the finished floor covering. For areas where moisture vapor emissions exceed the required limits coordinate with Basis-of-Design Manufacturer to install an appropriate Moisture Control System.
B. Crack and Joint Preparation:
1. Moving Joints and Moving Cracks – honor all expansion, isolation joints and moving cracks up through the underlayment. Install a flexible sealing compound per Basis-of Design Manufacturer’s instructions.
SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 4 of 5
2. Saw Cuts, Dormant Control Joints and Dormant Cracks – fill all dormant control joints and dormant cracks with a Low Viscosity Rigid Polyurethane Crack & Joint Repair or Cement-Based Finish Underlayment as recommended by the manufacturer.
C. Wooden subfloors: The wood subfloor either must be solid hardwood flooring; a minimum of 3/4” (19 mm) tongue-and-groove, APA-rated Type 1, exterior exposure plywood; or an approved OSB equivalent. The wood subfloor must be constructed according to prevailing building codes and must be solid and securely fixed to provide a rigid base free of undue flex. Any boards exhibiting movement must be refastened to create a sound, solid subfloor. The wood must be clean and free of all foreign matter. If necessary, sand down to bare wood. Vacuum to remove all dust. Do not use solvent, strippers or cleaners.
Open joints should be filled as recommended by the Basis-of-Design manufacturer. It is the responsibility of the installation contractor to ensure that the wood subfloor is thoroughly clean and properly anchored prior to installation.
D. Metal subfloors: Metal subfloors must be rigid, well supported, properly anchored and free of undue flex and vibration. They must also be clean and free of all rust, corrosion and foreign matter.
1. Non-lead metal substrates must be mechanically cleaned and profiled to create a bonding surface. Please note that care must be taken when mechanically preparing thin metal foils so that the metal foil is not compromised. Use an #80 or #100 grit sanding screen to mechanically profile the metal surface. A hand or floor sander may be used. After sanding, thoroughly deep vacuum to remove all loose material, and then wipe the metal using a clean, white cloth dampened with 91% isopropyl alcohol. Repeat wiping using a new cloth on each pass until the degree of discoloration on the cloth remains consistent on subsequent passes (typically, approx. 5 – 7 passes). Lightly shot blasting also is suitable. From this point until the metal has been primed, disposable shoe covers should be worn by anyone traversing the surface of the prepared metal. Allow 15 – 20 minutes for residual alcohol to evaporate before proceeding. Contact the Technical Service Department for guidelines on preparing lead substrates.
E. Adhesive residues on concrete must first be tested to make certain they are not watersoluble. Water-soluble adhesives must be completely mechanically removed down to clean concrete. Non- water-soluble adhesives should be prepared to a thin, well-bonded residue using the wet-scraping technique as recommended by the Resilient Floor Covering Institute (www.rfci.com). The prepared residue should appear as nothing more than a transparent stain on the concrete after scraping.
F. Non-porous subfloors such as ceramic, porcelain and quarry tile, burnished concrete, epoxy coating systems as well as terrazzo should be clean and free of all waxes, sealers, dust, dirt, debris and any other contaminant that may act as a bond breaker. If necessary, clean by mechanical methods such as shot blasting.
3.02 APPLICATION
A. Examine substrates and conditions under which materials will be installed. Do not proceed with installation until unsatisfactory conditions are corrected.
B. Coordinate installation with adjacent work to ensure proper sequence of construction.
Protect adjacent areas from contact due to mixing and handling of materials.
C. Priming: Comply with manufacturer’s printed instructions
SECTION 03 54 13 HYDRAULIC CEMENT UNDERLAYMENT
HYDRAULIC CEMENT UNDERLAYMENT 03 54 13 - 5 of 5
D. Mixing: Comply with manufacturer's printed instructions and the following.
1. For pump installations, the hydraulic cement underlayment shall be mixed using the Manufacturer’s recommended Automatic Mixing Pumps.
E. Application: Comply with manufacturer's printed instructions and the following:
1. Installations over metal and other non-porous substrates should be limited to a thickness of 1/2” (12.7 mm) unless otherwise approved by the Basis-of-Design Manufacturer. For all other substrates, self-leveling underlayment must be installed at a minimum thickness of 1/8” (3 mm) over the highest point in the floor, which typically results in an average thickness of 1/4” (6 mm) or more over the entire floor. Self-leveling underlayment can be installed up to 1 1/2” (4 cm) over large areas neat, and up to 5” (12.7 cm) with the addition of proper aggregate. Featheredge to match existing elevations. Confer with the Basis-ofDesign Manufacturer if a true featheredge is needed.
2. Pour or pump the liquid and spread into place with Spreader. Immediately use the Smoother to smooth the surface. Wear non- metallic cleats to avoid leaving marks in the liquid.
3. Wood subfloors require mesh-reinforced Resilient Emulsion Underlayment System. After priming, install 3.4 galvanized diamond metal lath by stapling to the wooden subfloor approximately every 6 inches to center.
4. Metal subfloors require Resilient Emulsion Underlayment System.
F. Curing
1. Finished product can be walked on in 2-3 hours. Moisture-insensitive tiles such as ceramic, quarry and porcelain can be installed after 6 hours. All other finish floor coverings can be installed after 16 hours at 70°F (21°C). For resinous systems such as epoxy and polyurethane floors please contact the Basis-ofDesign Manufacturer.
3.03 FIELD QUALITY CONTROL
A. Where specified, field sampling of the underlayment is to be done by taking an entire unopened bag of the product being installed to an independent testing facility to perform compressive strength testing in accordance with ASTM C 109/modified: air-cure only.
There are no in situ test procedures for the evaluation of compressive strength.
3.04 PROTECTION
A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, Masonite or other suitable protection course.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 454 of 1257
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 1 of 5
PART 1 GENERAL
1.01 DESCRIPTION:
A. This section specifies structural steel shown and classified by Section 2, Code of Standard Practice for Steel Buildings and Bridges.
1.02 RELATED WORK:
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 QUALITY ASSURANCE:
A. Fabricator and erector shall maintain a program of quality assurance in conformance with Section 8, Code of Standard Practice for Steel Buildings and Bridges. Work shall be fabricated in an AISC certified Category Std fabrication plant.
B. Before authorizing the commencement of steel erection, the controlling contractor shall ensure that the steel erector is provided with the written notification required by 29 CFR 1926.752. Provide copy of this notification to the Resident Engineer.
1.04 TOLERANCES:
A. Fabrication tolerances for structural steel shall be held within limits established by ASTM A6, by AISC 303, Sections 6 and 7, Code of Standard Practice for Buildings and Bridges, except as follows:
B. Elevation tolerance for closure plates at the building perimeter and at slab openings prior to concrete placement is 6 mm (1/4 inch).
1.05 REGULATORY REQUIREMENTS:
A. AISC 360: Specification for Structural Steel Buildings B. AISC 303: Code of Standard Practice for Steel Buildings and Bridges.
1.06 SUBMITTALS:
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples,
B. Shop and Erection Drawings: Complete
C. Certificates:
1. Structural steel.
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 2 of 5
2. Steel for all connections.
3. Welding materials.
D. Test Reports:
1. Welders' qualifying tests.
E. Design Calculations and Drawings:
1. Connection calculations, if required.
F. Record Surveys.
1.02 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced.
Publications are referenced in text by basic designation only.
B. American Institute of Steel Construction (AISC):
1. AISC 360-10 Specification for Structural Steel Buildings
2. AISC 303-10 Code of Standard Practice for Steel Buildings and Bridges C. American National Standards Institute (ANSI):
B18.22.1-65(R2008)................... Plain Washers
B18.22M-81(R2000)................... Metric Plain Washers D. American Society for Testing and Materials (ASTM):
A6/A6M-11 ................................. Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
A36/A36M-08 ............................. Standard Specification for Carbon Structural Steel A53/A53M-10 ............................. Standard Specification for Pipe, Steel, Black and HotDipped, Zinc-Coated Welded and Seamless A123/A123M-09 ......................... Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
A242/A242M-04(R2009) ............ Standard Specification for High-Strength Low- Alloy Structural Steel
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 3 of 5
A283/A283M-03(R2007) ............ Standard Specification for Low and Intermediate Tensile Strength Carbon Steel Plates
A307-10. ..................................... Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength
A325-10 ...................................... Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
A490-12 ...................................... Standard Specification for Heat-Treated Steel Structural Bolts 150 ksi Minimum Tensile Strength
A500/A500M-10a. ...................... Standard Specification for Cold Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and
Shapes
A501-07 ...................................... Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
A572/A572M-07 ......................... Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel A992/A992M-11………Standard Specification for Structural Steel Shapes
E. American Welding Society (AWS):
D1.1/D1.1M-10 ........................... Structural Welding Code-Steel F. Research Council on Structural Connections (RCSC) of The Engineering Foundation:
Specification for Structural Joints Using ASTM A325 or A490 Bolts G. Military Specifications (Mil. Spec.):
MIL-P-21035 .............................. Paint, High Zinc Dust Content, Galvanizing, Repair H. Occupational Safety and Health Administration (OSHA):
29 CFR Part 1926-2001 ............. Safety Standards for Steel Erection PART 2 PRODUCTS
2.01 MATERIALS:
A. Structural Steel: ASTM A572 W Shapes, A36 misc. steel
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 4 of 5
B. Structural Tubing: ASTM A500, Grade B.
C. Steel Pipe: ASTM A53, Grade B.
D. Bolts, Nuts and Washers:
1. High-strength bolts, including nuts and washers: ASTM A325 or A490 as noted.
2. Bolts and nuts, other than high-strength or as shown on plans: ASTM A307, Grade A.
3. Plain washers, other than those in contact with high-strength bolt heads and nuts:
ANSI Standard B18.22.1.
E. Zinc Coating: ASTM A123.
F. Galvanizing Repair Paint: Mil. Spec. MIL-P-21035.
PART 3 EXECUTION
3.01 CONNECTIONS (SHOP AND FIELD):
A. Welding: Welding in accordance with AWS D1.1. Welds shall be made only by welders and welding operators who have been previously qualified by tests as prescribed in AWS D1.1 to perform type of work required.
B. High-Strength Bolts: High-strength bolts tightened to a bolt tension not less than 70% of their minimum tensile strength. Tightening done with properly calibrated wrenches, by turn-of-nut method or by use of direct tension indicators (bolts or washers). Tighten bolts in connections identified as slip-critical using Direct Tension Indicators. Twist-off torque bolts are not an acceptable alternate fastener for slip critical connections.
3.02 FABRICATION:
A. Fabrication in accordance with Chapter M, AISC 360.
3.03 SHOP PAINTING:
A. General: Shop paint steel with primer in accordance with AISC 303, Section 6.
B. Do not apply paint to following:
1. Surfaces within 50 mm (2 inches) of joints to be welded in field.
2. Surfaces which will be encased in concrete.
3. Surfaces which will receive sprayed on fireproofing.
4. Top flange of members which will have shear connector studs applied.
C. Structural steel in the interstitial space that does not receive sprayed on fireproofing shall be painted with primer in accordance with general requirement of shop painting.
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
STRUCTURAL STEEL FRAMING 05 12 00 - 5 of 5
3.04 ERECTION:
A. General: Erection in accordance with AISC 303, Section 7B.
B. Temporary Supports: Temporary support of structural steel frames during erection in accordance with AISC 303, Section 7
3.05 FIELD PAINTING:
A. After erection, touch-up steel surfaces specified to be shop painted. After welding is completed, clean and prime areas not painted due to field welding.
B. Finish painting of steel surfaces is specified in Section 09 91 00, PAINTING.
3.06 SURVEY:
A. Upon completion of finish bolting or welding on any part of the work, and prior to start of work by other trades that may be supported, attached, or applied to the structural steel work, submit a certified report of survey to Resident Engineer for approval.
Reports shall be prepared by Registered Land Surveyor or Registered Civil Engineer as specified in Section 01 00 00, GENERAL REQUIREMENTS. Report shall specify that location of structural steel is acceptable for plumbness, level and alignment within specified tolerances specified in the AISC Manual.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 460 of 1257
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 1 of 11
PART 1 GENERAL
1.01 SUMMARY
A. This section specifies items and assemblies fabricated from structural steel shapes and other materials as shown and specified.
B. Items specified.
1. Support for Wall and Ceiling Mounted Items
2. Metal Railings
3. Bollards
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Shop Drawings:
1. Each item specified, showing complete detail, location in the project, material and size of components, method of joining various components and assemblies, finish, and location, size and type of anchors.
2. Mark items requiring field assembly for erection identification and furnish erection drawings and instructions.
3. Provide templates and rough-in measurements as required.
C. Furnish setting drawings and instructions for installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction.
1.04 QUALITY ASSURANCE
A. Each product type shall be the same and be made by the same manufacturer.
B. Assemble product to the greatest extent possible before delivery to the site.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 2 of 11
C. Include additional features, which are not specifically prohibited by this specification, but which are a part of the manufacturer's standard commercial product.
1.05 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.
The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
B18.2.2-87(R2005)....... Square and Hex Nuts
C. American Society for Testing and Materials (ASTM):
A36/A36M-08 ................ Structural Steel
A47-99(R2009) .............. Malleable Iron Castings
A53-10 ........................... Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless
A123-09 ......................... Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products A307-10 ......................... Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength A653/A653M-10 ............ Steel Sheet, Zinc Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the Hot-Dip Process
A786/A786M-09 ............ Rolled Steel Floor Plate
C1107-08 ...................... Packaged Dry, Hydraulic-Cement Grout (Non-shrink) F436-10 ......................... Hardened Steel Washers F1667-11 ....................... Driven Fasteners: Nails, Spikes and Staples D. American Welding Society (AWS):
D1.1-10 ......................... Structural Welding Code Steel D1.3-08 ......................... Structural Welding Code Sheet Steel E. National Association of Architectural Metal Manufacturers (NAAMM) AMP 521-01 .................. Pipe Railing Manual
AMP 500-06 .................. Metal Finishes Manual
Structural Steel Painting Council (SSPC)/Society of Protective Coatings:
SP 1-04 ......................... No. 1, Solvent Cleaning SP 2-04 ......................... No. 2, Hand Tool Cleaning SP 3-04 ......................... No. 3, Power Tool Cleaning
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 3 of 11
1.06 DESIGN CRITERIA
A. In addition to the dead loads, design fabrications to support the following live loads unless otherwise specified.
B. Ladders and Rungs: 120 kg (250 pounds) at any point.
C. Railings and Handrails: 900 N (200 pounds) in any direction at any point.
PART 2 PRODUCTS
2.01 MATERIALS
A. Structural Steel: ASTM A36.
B. Floor Plate:
1. Steel ASTM A786.
2. Aluminum: ASTM B632.
C. Steel Pipe: ASTM A53.
1. Galvanized for exterior locations.
2. Coated for interior locations, see SECTION 09 06 00 for coating.
D. Cast-Iron: ASTM A48, Class 30, commercial pattern.
E. Grout: ASTM C1107, pourable type.
F. Steel Pipe (Bollard): ASTM A53.
1. Galvanized for exterior locations.
2. Type S, Grade A unless specified otherwise.
3. NPS (inside diameter) as shown.
2.02 HARDWARE
A. Rough Hardware:
1. Furnish rough hardware with a standard plating, applied after punching, forming and assembly of parts; galvanized, cadmium plated, or zinc-coated by electrogalvanizing process. Galvanized G-90 where specified.
2. Use G90 galvanized coating on ferrous metal for exterior work unless nonferrous metal or stainless is used.
B. Fasteners:
1. Bolts with Nuts:
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 4 of 11
a. ASTM A307 for 415 MPa (60,000 psi) tensile strength bolts. b. ASTM F593 for stainless steel.
c. Screws: ASME B18.6.1.
d. Washers: ASTM F436, type to suit material and anchorage. e. Nails: ASTM F1667, Type I, style 6 or 14 for finish work.
2.03 FABRICATION GENERAL
A. Material
1. Use material as specified. Use material of commercial quality and suitable for intended purpose for material that is not named or its standard of quality not specified.
2. Use material free of defects which could affect the appearance or service ability of the finished product.
B. Size:
1. Size and thickness of members as shown.
2. When size and thickness is not specified or shown for an individual part, use size and thickness not less than that used for the same component on similar standard commercial items or in accordance with established shop methods.
C. Connections
1. Except as otherwise specified, connections may be made by welding, riveting or bolting.
2. Field riveting will not be approved.
3. Design size, number and placement of fasteners, to develop a joint strength of not less than the design value.
4. Holes, for rivets and bolts: Accurately punched or drilled and burrs removed.
5. Size and shape welds to develop the full design strength of the parts connected by welds and to transmit imposed stresses without permanent deformation or failure when subject to service loadings.
6. Use Rivets and bolts of material selected to prevent corrosion (electrolysis) at bimetallic contacts. Plated or coated material will not be approved.
7. Use stainless steel connectors for removable members machine screws or bolts.
D. Fasteners and Anchors
1. Use methods for fastening or anchoring metal fabrications to building construction as shown or specified.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 5 of 11
2. Where fasteners and anchors are not shown, design the type, size, location and spacing to resist the loads imposed without deformation of the members or causing failure of the anchor or fastener, and suit the sequence of installation.
3. Use material and finish of the fasteners compatible with the kinds of materials which are fastened together and their location in the finished work.
4. Fasteners for securing metal fabrications to new construction only, may be by use of threaded or wedge type inserts or by anchors for welding to the metal fabrication for installation before the concrete is placed or as masonry is laid.
5. Fasteners for securing metal fabrication to existing construction or new construction may be expansion bolts, toggle bolts, power actuated drive pins, welding, self-drilling and tapping screws or bolts.
E. Workmanship
1. General:
a. Fabricate items to design shown.
b. Furnish members in longest lengths commercially available within the limits shown and specified.
c. Fabricate straight, true, free from warp and twist, and where applicable square and in same plane.
d. Provide holes, sinkages and reinforcement shown and required for fasteners and anchorage items.
e. Provide openings, cut-outs, and tapped holes for attachment and clearances required for work of other trades.
f. Prepare members for the installation and fitting of hardware. g. Cut openings in gratings and floor plates for the passage of ducts, sumps, pipes, conduits and similar items. Provide reinforcement to support cut edges.
h. Fabricate surfaces and edges free from sharp edges, burrs and projections which may cause injury.
2. Welding:
a. Weld in accordance with AWS.
b. Welds shall show good fusion, be free from cracks and porosity and accomplish secure and rigid joints in proper alignment. c. Where exposed in the finished work, continuous weld for the full length of the members joined and have depressed areas filled and protruding welds finished smooth and flush with adjacent surfaces. d. Finish welded joints to match finish of adjacent surface.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 6 of 11
3. Joining:
a. Miter or butt members at corners.
b. Where frames members are butted at corners, cut leg of frame member perpendicular to surface, as required for clearance.
4. Cutting and Fitting:
a. Accurately cut, machine and fit joints, corners, copes, and miters. b. Fit removable members to be easily removed.
c. Design and construct field connections in the most practical place for appearance and ease of installation.
d. Fit pieces together as required.
e. Fabricate connections for ease of assembly and disassembly without use of special tools.
f. Joints firm when assembled.
g. Conceal joining, fitting and welding on exposed work as far as practical. h. Do not show rivets and screws prominently on the exposed face. i. The fit of components and the alignment of holes shall eliminate the need to modify component or to use exceptional force in the assembly of item and eliminate the need to use other than common tools.
F. Finish:
1. Finish exposed surfaces in accordance with NAAMM Metal Finishes Manual.
2. Aluminum: NAAMM AMP 501.
a. Mill finish, AA-M10, as fabricated, use unless specified otherwise. b. Clear anodic coating, AA-C22A41, chemically etched medium matte, with Architectural Class 1, 0.7 mils or thicker.
c. Colored anodic coating, AA-C22A42, chemically etched medium matte with Architectural Class 1, 0.7 mils or thicker.
d. Painted: AA-C22R10.
3. Steel and Iron: NAAMM AMP 504.
a. Zinc coated (Galvanized): ASTM A123, G90 unless noted otherwise. b. Surfaces exposed in the finished work:
1) Finish smooth rough surfaces and remove projections.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 7 of 11
2) Fill holes, dents and similar voids and depressions with epoxy type patching compound.
c. Shop Prime Painting:
1) Surfaces of Ferrous metal:
a) Items not specified to have other coatings.
b) Galvanized surfaces specified to have prime paint.
c) Remove all loose mill scale, rust, and paint, by hand or power tool cleaning as defined in SSPC-SP2 and SP3.
d) Clean of oil, grease, soil and other detrimental matter by use of solvents or cleaning compounds as defined in
SSPC-SP1.
e) After cleaning and finishing apply one coat of primer as specified in Section 09 90 00, PAINTING.
4. Stainless Steel: NAAMM AMP-504 Finish No. 4.
G. Protection:
1. Spot prime all abraded and damaged areas of zinc coating which expose the bare metal, using zinc rich paint on hot-dip zinc coat items and zinc dust primer on all other zinc coated items.
2.04 SUPPORTS
A. General:
1. Fabricate ASTM A36 structural steel shapes where shown.
2. Use clip angles or make provisions for welding hangers and braces to overhead construction.
3. Field connections may be welded or bolted.
B. For Wall Mounted Items:
1. For items supported by metal stud partitions.
2. Steel strip minimum of 150 mm (6 inches) wide, length extending one stud space beyond end of item supported.
C. For Trapeze Bars:
1. Construct assembly above ceilings as shown and design to support not less than a 340 kg (750 pound) working load at any point.
2. Fabricate trapeze supports as shown, with all exposed members, including screws, nuts, bolts and washers, fabricated of stainless steel.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 8 of 11
3. Continuously weld connections where welds shown.
4. Use modular channel where shown with manufacturers bolts and fittings.
2.05 GATE HINGES LATCH AND STOP
A. Manufacturer: Tymetal, Hoover Fence Co., or approved equal B. Galvanized ASTM A123, G-90 after fabrication.
C. Doors:
1. Provide pre-fabricated steel hinged door and frame as shown.
2. Color: to match fence color
3. Hardware:
a. Install lock or latch specified in Section 08 71 00, DOOR HARDWARE.
2.06 METAL RAILING
A. In addition to the dead load design railing assembly to support live load specified.
B. Fabrication General:
1. Provide continuous welded joints, dressed smooth and flush.
2. Standard flush fittings, designed to be welded, may be used.
3. Exposed threads will not be approved.
4. Form handrail brackets to size and design shown.
5. Interior Post Anchors:
a. Provide flanged fittings for securing fixed posts to floor with expansion bolts, unless shown otherwise.
b. Weld or thread flanged fitting to posts at base.
c. For securing removable posts to floor, provide close fitting sleeve insert or inverted flange base plate with stud bolts or rivets concrete anchor welded to the base plate.
d. Provide sliding flange base plate on posts secured with set screws. e. Weld flange base plate to removable posts set in sleeves.
C. Handrails:
1. Close free ends of rail with flush metal caps welded in place except where flanges for securing to walls with bolts are shown.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 9 of 11
2. Make provisions for attaching handrail brackets to wall, posts, and handrail as shown.
D. Aluminum Railings:
1. Fabricate from extruded aluminum.
2. Use tubular posts not less than 3 mm (0.125 inch) wall thickness for exterior railings.
3. Punch intermediate rails and bottom of top rails for passage of posts and machine to a close fit.
4. Where shown use extruded channel sections for top rail with 13 mm (1/2 inch) thick top cover plates and closed ends.
5. Fabricate brackets of extruded or wrought aluminum as shown.
6. Fabricate stainless pipe sleeves with closed bottom at least six inches deep having internal dimensions at least 13 mm (1/2 inch) greater than external dimensions of posts where set in concrete.
2.06 METAL LADDER
A. Aluminum Ladders:
1. Fixed-rail type, constructed of structural aluminum, with mill finish.
2. Fabricate side rails and rungs of size and design shown, with the rungs shouldered and headed into and welded to the rails.
3. Where shown fabrication side rails curved, twisted and formed into gooseneck.
4. Fabricate angle brackets at top and bottom and intermediate brackets where shown. Drill for bolting.
B. Ladder Rungs:
1. Fabricate from 25 mm (one inch) diameter steel bars.
2. Fabricate so that rungs will extend at least 100 mm (4 inches) into wall with ends turned 50 mm (2 inches), project out from wall 175 mm (7 inches), be 400 mm (16 inches) wide and be designed so that foot cannot slide off end.
3. Galvanized after fabrication, ASTM A123, G-90 rungs for exterior use and for access to pits.
2.07 STEEL PIPE BOLLARD
A. Provide bollard in accordance with ASTM A53 with dimensions as shown in standard detail SD320523-04. Anchor posts in concrete and fill solidly with concrete with a minimum compressive strength of 17 MPa 2500psi.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 10 of 11
PART 3 EXECUTION
3.01 INSTALLATION, GENERAL
A. Set work accurately, in alignment and where shown, plumb, level, free of rack and twist, and set parallel or perpendicular as required to line and plane of surface.
B. Set frames of access doors and similar items flush with finish floor and, where applicable, flush with side of opening.
C. Field weld in accordance with AWS.
1. Design and finish as specified for shop welding.
2. Use continuous weld unless specified otherwise.
D. Install anchoring devices and fasteners as shown and as necessary for securing metal fabrications to building construction as specified.
E. Spot prime all abraded and damaged areas of zinc coating as specified and all abraded and damaged areas of shop prime coat with same kind of paint used for shop priming.
3.02 INSTALLATION OF SUPPORTS
A. Anchorage to structure:
1. Secure angles or channels and clips to overhead structural steel by continuous welding unless bolting is shown.
2. Secure supports to concrete inserts by bolting as shown.
3. Secure steel plate to studs as detailed.
B. Supports for Wall Mounted items:
1. Locate center of support at anchorage point of supported item.
2. Locate support at top and bottom of wall hung cabinets.
3. Locate support at top of floor cabinets and shelving installed against walls.
4. Locate supports where required for items shown.
C. Supports for Trapeze Bars:
1. Secure plates to overhead construction with fasteners where shown.
2. Secure angle brace assembly to overhead construction with fasteners where shown and bolt plate to braces.
3. Fit modular channel unit to equipment and secure with modular channel unit manufacturer's standard fittings as shown.
SECTION 05 50 00 METAL FABRICATIONS
METAL FABRICATIONS 05 50 00 - 11 of 11
3.03 CLEAN AND ADJUSTING
A. Adjust movable parts including hardware to operate as designed without binding or deformation of the members centered in the opening or frame and, where applicable, contact surfaces fit tight and even without forcing or warping the components.
B. Clean after installation exposed prefinished and plated items and items fabricated from stainless steel, aluminum and copper alloys, as recommended by the metal manufacture and protected from damage until completion of the project.
3.04 INSTALLATION OF STEEL PIPE BOLLARD
A. Set bollards vertically in concrete piers. Compressive strength of concrete piers shall be 21MPa 3000psi. For dimensions of concrete piers
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 472 of 1257
SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 1 of 5
PART 1 GENERAL
1.01 SUMMARY
A. Provide labor, materials and equipment to complete all rough and finish carpentry work as indicated in the Contract Documents.
B. Work of this section include rough carpentry, framing, plywood, composite lumber, sheathing, wood nailers, blocking, sleepers, curbs, cants, wood and hollow metal door frames rough framing, finish carpentry and miscellaneous installed finished items.
1. Establish lines and levels for use of other trades.
2. Create openings and lintels for increased door heights.
C. Provide labor, materials and equipment to shore, brace either temporarily or permanently wood ceiling systems to remain that will be disturbed during demolition and preparation of new walls and ceiling systems.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 REFERENCES
A. AHA A135.4 - Basic Hardboard; American Hardboard Association.
B. ANSI A208.1 - Wood Particleboard.
C. ASTM C1036 - Standard Specification for Flat Glass.
D. ASTM C1048 - Standard Specification for Heat-Treated Flat Glass - Kind HS, Kind FT Coated and Uncoated Glass.
E. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.
F. AWI P-200 - Architectural Woodwork Quality Standards; Architectural Woodwork Institute.
G. AWPA C2 - Lumber, Timbers, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes; American Wood Preservers Association.
SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 2 of 5
H. NWWDA I.S.4 - Industry Standard for Water-Repellent Preservative Non-Pressure Treatment for Millwork; National Wood Window and Door Association.
I. NIST PS 1 - Construction and Industrial Plywood.
J. NIST PS 20 - American Softwood Lumber Standard.
K. WIC - Manual of Millwork; Woodwork Institute of California.
L. Forest Products Society (FPS): National Design Specification for Stress Grade Lumber and its Fastening.
1.04 SUBMITTALS
A. Product Data: Submit wood treatment certifications and instructions for proper use of each type of treated material.
B. Wood Product Certifications:
1. FSC Certification: Furnish certification indicating wood products are from “wellmanaged” forests.
2. Toxicity Certification: Furnish certification plywood has no added formaldehyde and has no toxic materials as defined by LEED.
1.05 QUALITY ASSURANCE
A. Lumber Grades: Provide visible grade stamp of an agency certified by FPS.
B. Lumber Standard: Comply with US Product Standard PS20 for each indicated use, including moisture content and actual sizes related to indicated nominal sizes.
C. Plywood Standard: Comply with PS1 (ANSI A199.1).
D. FSC Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC) including SmartWood Program and Forest Conservation Program.
PART 2 PRODUCTS
2.01 MATERIALS
A. Blocking: Provide dimensional lumber graded in accordance with FPS Grading Rules; Construction Grade, Douglas Fir; minimum S-Dry.
B. Plywood: Provide minimum APA C-D exterior (CDX) plywood; stress rated where spanning between supporting members; fire retardant treated; minimum 3/4" thick unless otherwise indicated. Where plywood will be exposed in finished work with painted finish provide A-C/EXT-APA plywood with Grade A face exposed and Grade C face concealed
SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 3 of 5
for exterior use: and A-C/INT-APA plywood with Grade A face exposed and Grade C face concealed for interior use.
1. General: Provide plywood certified with no added formaldehyde (NAF) and with no toxic materials as defined by LEED.
C. Nails, Spikes and Staples: Galvanized; size and type to suit application.
D. Bolts, Nuts, Washers, Lags, Pins and Screws: Medium carbon steel; galvanized; size and type to suit application.
E. Fasteners: Provide fasteners as required for complete, secure installation of miscellaneous rough carpentry.
1. Steel: Bolts or powder activated type.
E. Hardwood Lumber: Graded in accordance with WIC Custom; of quality suitable for transparent finish. Species as directed by architect.
F. Lumber for Shimming and blocking: Softwood lumber of Douglas fir species.
G. Primer: Alkyd primer sealer type.
H. Wood Filler: Solvent base, tinted to match surface finish color.
I. Wood Treatment: Water Repellant Preservative Treatment by Dipping Method: NWWDA I.S.4, with 0.25 percent retainage.
F. Wood Nailers
1. All lumber for concealer blocking, roof curbs, roof nailers shall be preservative treated hemlock, pine, or fir and shall be new lumber of the best quality available, perfectly sound, well-seasoned, and free from sapwood, large loose or dead knots, streaks and evidence of disease ort pests. Maximum moisture content shall be 15%.
G. Building Paper
1. 15 Lb. asphalt impregnated felt paper.
H. Recessed Mount Key Box
1. Knox Box, 3200 Series, recesses, 10 key steel vault, hinged door, color TBD.
Located at main entry as directed by Owner.
2. Recessed, 50 key steel vault, dark bronze, located in basement mechanical room as directed by Owner. Heavy duty box.
I. Construction Adhesives
1. Products of Contech Division of Rexnord Chemical Corporation or equal as approved by Architect.
a. Interior work dry areas – PL200
b. Exterior work and wet areas – PL 400
SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 4 of 5
c. Treated Wood – PL500
2.02 FABRICATION
A. Wood Preservation: Treat lumber and plywood to comply with applicable requirements of American Wood Preservers Association.
1. Decay Resistance Treatment: Pressure treat following items with water-borne preservatives for above ground use with AWPA C-2.
a. Treat wood members in connection with roofing, flashing, vapor barriers and waterproofing.
b. Treat wood members in contact with masonry, with concrete, and below grade.
c. Kiln-dry wood to a maximum moisture content of 19% after treatment with water-borne preservative.
2. Fire Retardant Treatment: Comply with AWPA standards for pressure impregnation with fire-retardant chemicals to achieve flame-spread rating of not more than 25 in accordance with ASTM E84 or UL Test 723. a. Treat interior wood and plywood complying with AWPA C20 and C27, Interior Type A, and identify with FRTW.
1) Exterior Type: Where indicated for exterior applications, provide fire treated wood passing ASTM D2898 rain test.
b. Provide UL label on each piece of fire-retardant wood and plywood. c. Kiln-dry treated items to maximum moisture content of 19%.
3. Complete fabrication of treated items prior to treatment, wherever possible; if cut after treatment, coat cut surfaces with heavy brush coat of same chemical used for treatment.
4. Inspect each piece after drying and discard damaged and defective pieces.
PART 3 EXECUTION
3.01 PLACEMENT
A. Place miscellaneous rough carpentry true to lines and levels.
B. Correlate location so attached work will comply with design requirements and be properly located.
C. Construct members of continuous pieces of longest possible lengths.
D. Fit carpentry work to other work; scribe and cope as required for accurate fit.
E. Shim with metal or slate for bearing on concrete and masonry.
SECTION 06 10 00 ROUGH & FINISH CARPENTRY
ROUGH & FINISH CARPENTRY 06 10 00 - 5 of 5
F. Securely attach carpentry work to substrates by anchoring and fastening as required by recognized standards.
1. Provide washers under bolt heads and nuts in contact with wood.
G. Wood Blocking: Provide blocking of S4S lumber not less than 1-1/2" wide and of thickness required to provide adequate support or to properly locate attached material.
1. Provide attachment to other work; form to shapes shown.
2. Countersink bolts and nuts flush with surfaces.
3. Remove temporary blocking when no longer needed.
4. Anchor to formwork before concrete placement.
H. Plywood: Comply with recommendations of American Plywood Association (APA) for fabrication and installation of plywood work.
1. Provide attachment to other work; form to shapes shown.
2. Align fasteners for exposed view aesthetic as shown.
3. Fit carpentry work to other work.
4. Adjust, trim and level.
END OF SECTION 06 10 00
THIS PAGE INTENTIONALLY LEFT BLANK Page 478 of 1257
SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 1 of 4
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes: Provide mill fabricated architectural woodwork with accessories as required for complete finished installation.
1. Provide wood veneer-faced cabinetwork.
2. Provide solid surface counter.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Product Data: Submit manufacturer’s literature for manufactured items.
C. Shop Drawings: Indicate materials and wood species, component profiles, fastening, joining details, finishes, and accessories.
1. Certification: Provide WI MoM Certified Compliance Label on shop drawings.
D. Samples: Furnish samples of each exposed material.
E. Certificates: "Manual of Millwork" (WI MoM) certification is required.
1. General: Before delivery to jobsite, provide WI MoM Certified Compliance Certificate indicating grade of millwork products to be furnished and certify WI MoM requirements for specified grades shall be met.
2. Casework: Each unit to bear WI MoM Certified Compliance Label.
3. Installation: Provide WI MoM Certified Compliance Certificate for Installation.
4. FSC Certification: Furnish certification indicating wood products are from “wellmanaged” forests.
SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 2 of 4
5. Toxicity Certification: Furnish certification plywood has no added formaldehyde and has no toxic materials as defined by LEED.
1.04 QUALITY ASSURANCE
A. Fabricator Qualifications: Member of Woodwork Institute (formerly Woodwork Institute of California) with minimum five years successful experience fabricating architectural woodwork similar to that required for Project.
B. Standards: Perform architectural woodwork in accordance with recommendations Woodwork Institute "Manual of Millwork" (WI MoM).
C. Seismic Anchorage: Provide seismic anchorage for wall cabinets as required by CBC.
D. FSC Certified Wood Products: Wood products to be from forests certified “well-managed” by an agency accredited by Forest Stewardship Council (FSC) including SmartWood Program and Forest Conservation Program.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver architectural woodwork until site conditions are adequate to receive work; protect items from weather while in transit.
1. Allow architectural woodwork shop finish to completely dry prior to delivery to site; allow materials to off-gas volatile organic compound (VOC) emissions off site.
B. Store materials indoors, in ventilated areas with constant but minimum temperature of 60 degrees F and maximum relative humidity of 25% to 55%.
C. Do not begin installation of architectural woodwork until space is fully enclosed and mechanical systems are fully operational.
1. Maintain interior installation areas at 70 degrees F and 50% to 55% relative humidity.
D. Immediately remove from site materials with visible mold and materials with mildew.
PART 2 PRODUCTS
2.01 MATERIALS
A. Wood Veneer Finished Casework:
1. Casework doors and exposed panels: Veneer finish per Architectural Finishes List, Section 09 06 00.
2. Factory Finish: Shop prime with polyurethane opaque finish;
SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 3 of 4
a. Color and veneer species per Architectural Finishes List, Section 09 06
00. B. Countertop:
1. Solid Polymer Systems: Manufacturer's standard polymer system with color throughout thickness; provide manufacturer recommended joint adhesive; exposed surfaces finished to match top.
a. Quality: Comparable to WI MoM/Premium Grade.
b. Type: Not less than 1/2" thick sheet designed to accept bowls as indicated and as specified in Division 15 and with edge conditions as indicated on Drawings.
c. Color: Manufacturer's standard color as selected by Architect. d. Manufacturers:
1) DuPont Co./Corian.
2) Avonite, Inc./Avonite.
3) Formica Corp./Surell.
2. Core: Provide plywood with no added formaldehyde and no toxic materials.
C. Anchors, Nails and Screws: Select material, type, size and finish required by each substrate for secure anchorage; provide toothed steel or lead expansion bolt screws for drilled-in-place anchors.
2.02 FABRICATION
A. General: Fabricate architectural woodwork in accordance with specified quality standards.
B. Plastic Laminate:
1. Apply plastic laminate finish in full uninterrupted sheets consistent with manufactured sizes.
2. Make corners and joints hairline; slightly bevel arises.
3. Locate butt joints at least 2'-0" from cutouts.
4. Cap exposed edges with plastic laminate of same finish and pattern.
5. Apply laminate backing sheet to reverse side of laminate surfaces.
SECTION 06 40 23 INTERIOR ARCHITECTURAL WOODWORK
INTERIOR ARCHITECTURAL WOODWORK 06 40 23 - 4 of 4
6. Provide cutouts for inserts, fixtures and fittings; verify locations from on-site dimensions.
7. Prime paint contact surfaces of cutouts.
C. Use exposed fastening devices or nails only when approved and unavoidable; arrange neatly.
D. Assemble woodwork in shop in sizes easily handled and to ensure passage through building openings.
PART 3 EXECUTION
3.01 EXAMINATION
A. Field Measurements: Take field measurements prior to preparation of shop drawings and fabrication where possible; do not delay job progress, allow for trimming and fitting.
3.02 INSTALLATION
A. Install work consistent with specified quality grade, plumb, level, true and straight with no distortions.
1. Shim as required, using concealed shims.
B. Secure work to grounds, stripping and blocking with countersunk, concealed fasteners and blind nailing as required for a complete installation.
C. Scribe and cut for accurate fit to other finished work.
D. Route and prepare beams for installation of beam connectors and hangers.
E. Attach connectors to wall anchors and solid wood beams.
F. Attach architectural woodwork securely in place with uniform joints providing for thermal and building movements.
G. Attach countertop material to casework per manufacturer.
H. Acceptable Tolerances:
1. Variation from True Position: Maximum 1/16" at any position and maximum 1/8" in any 10'-0" length.
2. Adjoining Surfaces of Same Material: No variation permitted.
3. Offset with Abutting Materials: Maximum 1/32".
END OF SECTION
SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 1 of 4
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes rubber waterproofing for below grade structures.
1.2 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.3 SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings:
1. Show locations and extent of waterproofing.
2. Include details for substrate joints and cracks, sheet flashings, penetrations, inside and outside corners, tie-ins with adjoining waterproofing, and other termination conditions.
C. Sample warranty.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by waterproofing manufacturer.
1.5 WARRANTY
A. Manufacturer's Special Warranty: Manufacturer agrees to repair or replace waterproofing that fails in materials or workmanship within specified warranty period.
1. Warranty Period: 10 years from date of Substantial Completion.
SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 2 of 4
PART 2 - PRODUCTS
2.1 RUBBER WATERPROOFING
A. Two-Component, Reinforced, Rubber Waterproofing system: ASTM C836/C836M; coal-tar free.
1. Basis-of-Design or Approved Equal:
a. Manufacturer: GCP Applied Technologies Inc., 2325 Lakeview Parkway, Suite 400, Alpharetta, GA 30009, USA; gcpat.com; 1-866-333-3726 b. Product: Procor Below Grade – Fluid applied waterproofing & all associated system components which include:
1) Procor 75 Spray Grade – For horizontal and vertical applications 2) Hydroduct Drainage Composites – Geocomposite Drainage Sheets a) HYDRODUCT® 660 Drainage Composite for use on horizontal applications.
b) HYDRODUCT® 220 Drainage Composite for use on vertical applications.
3) Bituthene Liquid Membrane – Detailing at pipe entries, etc. 4) Preprufe Tape – For tie-ins of Procor, Bituthene, or Preprufe waterproofing sheet membranes.
5) Preprufe 300R Plus – Pre-applied waterproofing membrane that bonds integrally to poured concrete
2. Hydrostatic-Head Resistance: 65 feet minimum; ASTM D5385/D5385M.
2.2 AUXILIARY MATERIALS
A. Primer: Manufacturer's standard primer, sealer, or surface conditioner; factory-formulated.
B. Sheet Flashing: 50-mil- (1.3-mm-) minimum, nonstaining, uncured sheet neoprene.
1. Adhesive: Manufacturer's recommended contact adhesive.
C. Membrane-Reinforcing Fabric: Manufacturer's recommended fiberglass mesh or polyester fabric.
D. Joint Reinforcing Strip: Manufacturer's recommended fiberglass mesh or polyester fabric.
E. Joint Sealant: Multicomponent polyurethane sealant, compatible with waterproofing; and as recommended by manufacturer for substrate and joint conditions.
1. Backer Rod: Closed-cell polyethylene foam.
2.3 PRE-APPLIED WATERPROOFING MEMBRANE – BELOW SLAB
A. Pre-Applied waterproofing membrane: Composite membrane comprised of a heavy duty grade HDPE film, pressure sensitive adhesive, and weather resistant protective coating to form an integral bond to poured concrete. Designed for horizontal and vertical use below slabs.
1. Thickness: 0.046 inch (1.2 mm), nominal
2. Lateral water migration resistance:
SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 3 of 4
3. Hydrostatic-Head Resistance: 231 feet minimum; ASTM D5385.
4. Tensile strength: 4,000 psi (27.6 Mpa)
5. Required overlap: 3” minimum
2.4 PROTECTION COURSE
A. Protection Course: ASTM D6506, semirigid sheets of fiberglass- or mineral-reinforced-asphaltic core, pressure laminated between two asphalt-saturated fibrous liners and as follows:
1. Thickness: 1/4 inch (6 mm), nominal, for vertical applications; 1/4 inch (6 mm), nominal, elsewhere.
2. Adhesive: Rubber-based solvent type recommended in writing by waterproofing manufacturer.
2.5 MOLDED-SHEET DRAINAGE PANELS
A. Nonwoven-Geotextile-Faced, Molded-Sheet Drainage Panel with Polymeric Film: Composite subsurface drainage panel consisting of a studded, nonbiodegradable, molded-plastic-sheet drainage core; with a nonwoven, needle-punched geotextile facing with an apparent opening size not exceeding No. 70 (0.21-mm) sieve laminated to one side of the core and a polymeric film bonded to the other side; and with a vertical flow rate through the core of [9 to 21 gpm per ft. (112 to 261 L/min. per m)].
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean, prepare, and treat substrates according to manufacturer's written instructions. Provide clean, dust-free, and dry substrates for waterproofing application.
B. Mask off adjoining surfaces not receiving waterproofing to prevent spillage and overspray affecting other construction.
C. Close off deck drains and other deck penetrations to prevent spillage and migration of waterproofing fluids.
D. Remove grease, oil, bitumen, form-release agents, paints, curing compounds, acid residues, and other penetrating contaminants or film-forming coatings from concrete.
E. Remove fins, ridges, and other projections, and fill honeycomb, aggregate pockets, holes, and other voids.
F. Prepare surfaces at terminations and penetrations through waterproofing and at expansion joints, drains, sleeves, and corners according to waterproofing manufacturer's written instructions and to recommendations in ASTM C898/C898M.
G. Apply waterproofing in two separate applications, and embed a joint reinforcing strip in the first preparation coat when recommended by waterproofing manufacturer.
SECTION 07 14 16 COLD FLUID-APPLIED WATERPROOFING
COLD FLUID-APPLIED WATERPROOFING 07 21 00 - 4 of 4
H. Prepare, treat, rout, and fill joints and cracks in substrate according to waterproofing manufacturer's written instructions and to recommendations in ASTM C898/C898M. Before coating surfaces, remove dust and dirt from joints and cracks according to ASTM D4258.
I. Install sheet flashing and bond to deck and wall substrates where required according to waterproofing manufacturer's written instructions.
3.2 WATERPROOFING APPLICATION
A. Apply waterproofing according to manufacturer's written instructions and to recommendations in ASTM C898/C898M.
B. Unreinforced Waterproofing Applications.
1. Apply one or more coats of waterproofing to obtain a seamless membrane free of entrapped gases and pinholes, with a dry film thickness of 60 mils (1.5 mm).
C. Install protection course with butted joints over waterproofing before starting subsequent construction operations.
1. For horizontal applications, install protection course loose laid over fully cured membrane.
2. For vertical applications, set protection course in nominally cured membrane, which will act as an adhesive. If membrane cures before application of protection course, use adhesive.
3. Molded-sheet drainage panels may be used in place of a separate protection course for vertical applications when approved in writing by waterproofing manufacturer.
3.3 MOLDED-SHEET DRAINAGE PANEL INSTALLATION
A. Place and secure molded-sheet drainage panels, with geotextile facing away from wall or deck substrate, according to manufacturer's written instructions. Use adhesive or another method that does not penetrate waterproofing. Lap edges and ends of geotextile to maintain continuity.
Protect installed molded-sheet drainage panels during subsequent construction.
1. For vertical applications, install protection course before installing drainage panels.
3.4 PROTECTION
A. Do not permit foot or vehicular traffic on unprotected membrane.
B. Protect waterproofing from damage and wear during remainder of construction period.
C. Correct deficiencies in or remove waterproofing that does not comply with requirements; repair substrates, reapply waterproofing, and repair sheet flashings.
END OF SECTION
SECTION 07 21 00 BUILDING INSULATION
BUILDING INSULATION 07 21 00 - 1 of 3
PART 1 GENERAL
1.01 SUMMARY
A. Provide labor, material, equipment and services to furnish and install building insulation as shown on the drawings, as specified herein and as required for a complete and proper installation, including, but not limited to, the following:
1. Thermal Insulation
2. Acoustic Insulation
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Product Data: Furnish manufacturer's literature for each type of insulation.
1. Submit Underwriter's Laboratory approval numbers for required fire ratings; approvals of other laboratories contingent upon acceptance of applicable authorities.
C. Certificates: Stating the type, thickness and "R" value (thermal resistance) of the insulation to be installed.
1.04 STORAGE AND HANDLING
A. Store insulation materials in weathertight enclosure.
B. Protect insulation from damage from handling, weather and construction operations before, during, and after installation.
1.05 APPLICABLE STANDARDS: The latest edition of publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.
A. Federal Specifications (Fed. Spec.)
FF N 105B (3) Nails, Brads, Staples and Spikes: Wire, Cut and Wrought B. California Building Codes (CBC) 2019 Energy Codes
SECTION 07 21 00 BUILDING INSULATION
BUILDING INSULATION 07 21 00 - 2 of 3
C. American Society for Testing and Materials (ASTM):
C552 Cellular Glass Block and Pipe Thermal Insulation
C553 Mineral Fiber Blanket and Felt Insulation (Industrial Type) C578 Preformed Cellular Polystyrene Thermal Insulation
C591 Unfaced Preformed Rigid Cellular Polyurethane Thermal Insulation C612 Mineral Fiber Block and Board Thermal Insulation
C665 Mineral Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
C728 Perlite Thermal Insulation Board
C954 Steel Drill Screws for the Application of Gypsum Board or Metal Plaster Base to Steel Studs From 0.033 inch to 0.112 inch in thickness
C1002 Steel Drill Screws for the Application of Gypsum Board PART 2 PRODUCTS
2.01 MATERIALS
A. Thermal Batt Insulation: Thermafiber SAFB, preformed slag mineral or glass fiber with thermosetting resin binders, conforming to ASTM C665, Type 1, HH-I-521F, unfaced; formaldehyde-free and with no toxic materials. Flame Spread/Smoke Density Rating:
Maximum 0/0, ASTM E84. Combustibility: Pass ASTM E136.
B. Acoustical Insulation
1. Mineral Fiber Batt or Blankets: ASTM C665, Type 1. Thickness as shown; of widths and lengths to fit tight against framing.
C. Rigid Insulation
1. On the inside face of exterior walls.
2. Cellular Glass Block, ASTM C552, Type 1.
D. Accessories: Furnish as recommended by insulation manufacturer for insulation types, substrates, and conditions involved.
E. Aerogel.
1. Flexible gel filled blanket material: ASTM C1728, Type III, Grade 1A, 10 mm (0.4 in) thick, shown; of widths and lengths to fit tight against framing. Products similar to Pryrogel HPS.
SECTION 07 21 00 BUILDING INSULATION
BUILDING INSULATION 07 21 00 - 3 of 3
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify substrate and adjacent materials are dry and ready to receive insulation; beginning installation signifies acceptance of conditions.
B. Ensure mechanical and electrical items affecting work are properly placed, complete, and have been inspected by Architect prior to commencement of installation.
3.02 INSTALLATION
A. Install batt or blanket insulation with tight joints and filling framing void completely. Seal cuts, tears, and un-lapped joints with tape.
B. Fit insulation tight against adjoining construction and penetrations, unless specified otherwise. Install insulation in accordance with manufacturer's instructions.
C. Cut and trim insulation neatly, to fit spaces.
D. Fit insulation tight within spaces and tight to and behind mechanical and electrical services within insulation plane; leave no gaps or voids; maintain integrity of thermal barrier.
E. Friction fit batt insulation in place; use tape or penetration supports as necessary to assure permanent installation.
F. Fasten blanket insulation between metal studs and wall furring with continuous pressure sensitive tape along edges or adhesive.
G. Pack insulation around door frames and windows and in cracks, expansion joints, control joints, door soffits and other voids. Pack behind outlets, around pipes, ducts, and services encased in wall or partition. Hold insulation in place with pressure sensitive tape or adhesive.
H. Do not compress insulation below required thickness except where embedded items prevent required thickness.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 490 of 1257
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 1 of 8
PART 1 - GENERAL
1.01 DESCRIPTION
A. Roof and deck insulation on new construction ready to receive roofing or waterproofing membrane over wood deck.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced.
Publications are referenced in the text by the basic designation only. Editions of applicable publications current on date of issue of bidding documents apply unless otherwise indicated.
B. American Society of Heating, Refrigeration and Air Conditioning (ASHRAE):
90.1-07 .......................... Energy Standard for Buildings Except Low-Rise Residential Buildings
C. ASTM International (ASTM):
C208-08 ........................ Cellulosic Fiber Insulating Board C552-07 ........................ Cellular Glass Thermal Insulation C726-05 ........................ Mineral Fiber Roof Insulation Board C728-05 ........................ Perlite Thermal Insulation Board C1177/C1177M-08 ........ Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
C1278/C1278M-07 ........ Standard Specification for Fiber-Reinforced Gypsum Panel C1289-10 ...................... Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board C1396/C1396M-09 ........ Standard Specification for Gypsum Board D41-05 .......................... Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
D312-06 ........................ Asphalt Used in Roofing
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 2 of 8
D1970-09 ...................... Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing
Underlayment for Ice Dam Protection
D2178-04 ...................... Asphalt Glass Felt Used in Roofing and Waterproofing D2822-05 ...................... Asphalt Roof Cement
D4586-07 ...................... Standard Specification for Asphalt Roof Cement, Asbestos-Free E84-09 ........................... Standard Test Method for Surface Burning Characteristics of Building Material
F1667-05 ....................... Driven Fasteners: Nails, Spikes, and Staples D. FM Approvals: RoofNav Approved Roofing Assemblies and Products. 4450-89 ......................... Approved Standard for Class 1 Insulated Steel Deck Roofs 4470-10 ......................... Approved Standard for Class 1 Roof Coverings 1-28-09 .......................... Loss Prevention Data Sheet: Design Wind Loads. 1-29-09 .......................... Loss Prevention Data Sheet: Above-Deck Roof Components 1-49-09 .......................... Loss Prevention Data Sheet: Perimeter Flashing E. National Roofing Contractors Association: Roofing and Waterproofing Manual F. U.S. Department of Agriculture (USDA): USDA BioPreferred Catalog, www.biopreferred.gov
G. Underwriters Laboratories, Inc. (UL): Fire Resistance Directory (2009) H. U.S. Department of Commerce National Institute of Standards and Technology (NIST):
DOC PS 1-09 ................ U.S. Product Standard for Construction and Industrial Plywood DOC PS 2-04 ................ Performance Standard for Wood-Based Structural-Use Panels.
1.04 PERFORMANCE REQUIREMENTS
A. Thermal Performance: Provide roof insulation meeting minimum overall average R-value of 33 (6 inches).
B. FM Approvals: Provide roof insulation complying with requirements in FM Approvals 4450 and 4470 as part of specified roofing system, listed in FM Approvals "RoofNav" as part of roofing system meeting Fire/Windstorm Classification in Division 07 roofing section.
1.05 QUALITY CONTROL
A. Requirements of Division 07 roofing section for qualifications of roofing system insulation Installer; Work of this Section shall be performed by same Installer.
B. Requirements of Division 07 roofing section for inspection of Work of this Section and qualifications of Inspector.
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 3 of 8
C. Unless specified otherwise, comply with the recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to insulation for storage, handling, and application.
D. Requirements of roofing system uplift pressure design for specified roofing system.
E. Requirements of applicable FM Approval for specified roofing system insulation attachment.
G. Bio-Based Materials: Where applicable, provide products designated by USDA and meeting or exceeding USDA recommendations for bio-based content, and products meeting Rapidly Renewable Materials and certified sustainable wood content definitions; refer to www.biopreferred.gov.
1.06 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Product Data:
1. Asphalt and adhesive materials, each type.
2. Roofing cement, each type.
3. Roof insulation, each type.
4. Fastening requirements.
C. Federal Sustainable Design Submittals:
1. Product Data for Federally-Mandated Bio-Based Materials: For roof materials, indicating USDA designation and compliance with definitions for bio-based products, Rapidly Renewable Materials, and certified sustainable wood content.
D. Shop Drawings: Include plans, sections, details, and attachments.
1. Nailers, cants, and terminations.
2. Layout of insulation showing slopes, tapers, penetration, and edge conditions.
E. Samples:
1. Roof insulation, each type.
2. Nails and fasteners, each type.
F. Certificates:
1. Indicating type, thermal conductance, and minimum and average thickness of insulation.
2. Indicating materials and method of application of insulation system meet the requirements of FM Approvals for specified roofing system.
G. Laboratory Test Reports: Thermal values of insulation products.
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 4 of 8
H. Layout of tapered roof system showing units required.
I. Documentation of supervisors' and inspectors' qualifications.
1.07 DELIVERY, STORAGE AND MARKING
A. Comply with the recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to built-up roofing for storage, handling and installation requirements.
1.08 QUALITY ASSURANCE:
A. Roof insulation on combustible or steel decks shall have a flame spread rating not greater than 75 and a smoke developed rating not greater than 150, exclusive of covering, when tested in accordance with ASTM E84, or shall have successfully passed FM Approvals 4450.
1. Insulation bearing the UL label and listed in the UL Building Materials Directory as meeting the flame spread and smoke developed ratings will be accepted inlieu-of copies of test reports.
2. Compliance with flame spread and smoke developed ratings will not be required when insulation has been tested as part of a roof construction assembly of the particular type used for this project and the construction is listed as fire-classified in the UL Building Materials Directory or listed as Class I roof deck construction in the FM Approvals "RoofNav."
3. Insulation tested as part of a roof construction assembly shall bear UL or FM labels attesting to the ratings specified herein.
PART 2 - PRODUCTS
2.01 ADHESIVE MATERIALS
A. Adhesive Materials, General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.
1. Liquid-type adhesive materials shall comply with VOC limits of authorities having jurisdiction.
2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. Plastic Foam Adhesives: 50 g/L.
b. Multipurpose Construction Adhesives: 70 g/L.
c. Fiberglass Adhesives: 80 g/L.
d. Contact Adhesives: 80 g/L.
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 5 of 8
e. Other Adhesives: 250 g/L.
f. Non-membrane Roof Sealants: 300 g/L.
g. Sealant Primers for Non-porous Substrates: 250 g/L.
h. Sealant Primers for Porous Substrates: 775 g/L.
B. Primer: ASTM D41.
C. Asphalt: ASTM D312, Type III or IV for vapor retarders and insulation.
D. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.
E. Bead-Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.
F. Full-Spread Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended spray-applied, low-rise, two-component urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.
G. Roof Cement: Asbestos free, ASTM D2822, Type I or Type II, ; or, D4586, Type I or Type II.
2.02 ROOF AND DECK INSULATION
A. Roof and Deck Insulation, General: Preformed roof insulation boards approved by roofing manufacturer and listed as component of FM Approvals-approved roofing system.
B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 1, Grade 2, felt or glassfiber mat facer on both major surfaces.
C. Cellular Glass Board Insulation: ASTM C552, Type IV, kraft-paper sheet faced.
D. Perlite Board Insulation: ASTM C728, expanded perlite, cellulosic fibers, binders, and waterproofing agents with top surface seal coated.
E. Cellulosic Fiber Board Insulation: ASTM C208, Type II, Grade 1 for built-up asphalt or modified bitumen roofing.
F. Tapered Roof Insulation System:
1. Fabricate of mineral fiberboard, polyisocyanurate, perlite board, or cellular glass.
Use only one insulation material for tapered sections. Use only factory-tapered insulation.
2. Cut to provide high and low points with crickets and slopes as shown.
3. Minimum thickness of tapered sections; 38 mm (1-1/2 inch).
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 6 of 8
4. Minimum slope 1:48 (1/4 inch per 12 inches).
2.03 INSULATION ACCESSORIES
A. Glass (Felt): ASTM D2178, Type VI, heavy duty ply sheet.
B. Cants and Tapered Edge Strips:
1. Wood Cant Strips: Refer to Division 06 Section "Rough Carpentry."
2. Insulation Cant Strips: ASTM C208, Type II, Grade 1, cellulosic-fiber insulation board.
3. Tapered Edge Strips: 1:12 (one inch per foot), from 0 mm (0 inches), 300 mm to 450 mm (12 inches to 18 inches) wide.
a. Cellulosic Fiberboard: ASTM C208.
b. Mineral Fiberboard: ASTM C726.
c. Perlite Board: ASTM C728.
C. Vapor Retarder:
1. Glass-Fiber Felts: ASTM D2178, Type IV, asphalt impregnated.
2. Self-Adhering Sheet Vapor Retarder: ASTM D1970, minimum of 1.0-mm- (40- mil-) thick, polyethylene film laminated to layer of rubberized asphalt adhesive, or
0.76- to 1.0-mm- (30- to 40-mil-) thick, polyethylene film laminated to layer of butyl rubber adhesive; maximum permeance rating of 6 ng/Pa x s x sq. m (0.1 perm).
2.04 FASTENERS
A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with FM Approvals 4470, designed for fastening substrate board to roof deck.
B. Staples and Nails: ASTM F1667. Type as designated for item anchored and for substrate.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Comply with requirements of Division 07 roofing section.
3.02 PREPARATION
A. Comply with requirements of Division 07 roofing section.
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 7 of 8
3.03 RIGID INSULATION INSTALLATION
A. Insulation Installation, General:
1. Install roof insulation in accordance with roofing system manufacturer's written instructions.
2. Install roof insulation in accordance with requirements of FM Approval's Listing for specified roofing system.
3. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate prior to installation of insulation.
4. Cant Strips: Install preformed insulation cant strips at junctures of roofing system with vertical construction.
B. Insulation Thickness:
1. Thickness of roof insulation shown on drawings is nominal. Actual thickness shall provide the average thermal resistance "R" value of not less than that specified in Performance Requirements Article.
2. When thickness of insulation to be used is more or less than that shown on the drawings, make adjustments in the alignment and location of roof drains, flashing, gravel stops, fascias and similar items at no additional cost to the Government.
3. Where tapered insulation is used, the insulation thickness at high points and roof edges shall be as shown on the drawings; the thickness at the low point (drains) shall be not less than 38 mm (1-1/2 inches).
5. Use not less than two layers of insulation when insulation is 68 mm (2.7 inch) or more in thickness unless specified otherwise. Stagger joints minimum 150 mm (6 inches).
C. Lay insulating units with close joints, in regular courses and with cross joints broken.
When laid in more than one layer, break joints of succeeding layers of roof insulation with those in preceding layer.
D. Lay units with long dimension perpendicular to the rolled (longitudinal) direction of the roofing felt.
E. Seal all cut edges at penetrations and at edges against blocking with bitumen or roof cement.
F. Cut to fit tight against blocking or penetrations.
G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.
H. Installation Method:
1. Adhered Insulation:
SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 8 of 8
a. Prime substrate as required.
b. Set each layer of insulation firmly in solid mopping of hot asphalt. c. Set each layer of insulation firmly in ribbons of bead-applied insulation adhesive.
d. Set each layer of insulation firmly in uniform application of full-spread insulation adhesive.
2. Mechanically Fastened Insulation:
a. Fasten insulation in accordance with FM Approval's "RoofNav" requirement in Division 07 roofing section.
b. Fasten insulation to resist uplift pressures specified in Division 07 roofing section.
3. Mechanically Fastened and Adhered Insulation:
a. Fasten first layer of insulation according to "Mechanically Fastened Insulation" requirements.
b. Fasten each subsequent layer of insulation according to "Adhered Insulation" requirements.
END OF SECTION
SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 1 of 6
PART 1 GENERAL
1.01 SUMMARY
A. Manufacturer’s requirements for the proper design, use, and installation of an Exterior Insulation and Finish System.
1. The scope of this work includes creating EIFS infill panels at exterior precast panel openings with a heavy aggregate finish.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 REFERENCES
A. ASTM B117 Test Method for Salt Spray (Fog) Testing
B. ASTM C1135 Test Method for Determining Tensile Adhesion Properties of Structural Sealants
C. ASTM D968 Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
D. ASTM D1037 Standard Test Methods for Evaluating Properties of Wood-Base Fiber and Particle Panel Materials
E. ASTM D2247 Practice for Testing Water Resistance of Coatings in 100 Percent Relative Humidity
F. ASTM D2294 Standard Test Method for Creep Properties of Adhesives in Shear by Tension Loading (Metal-to-Metal).
G. ASTM D2794 Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
H. ASTM D3273 Standard Test Method for Resistance to Growth of Mold on the Surface of I. ASTM E84 Test Method for Surface Burning Characteristics of Building Materials J. ASTM E108 Standard Test Methods for Fire Tests of Roof Coverings K. ASTM E119 Standard Test Method for Fire Tests of Building Construction and Materials.
L. ASTM E330 Test method for Structural Performance by Uniform Static Air Pressure Difference
M. ASTM E331 Test Method for Water Penetration by Uniform Static Air Pressure Difference
SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 2 of 6
N. ASTM E695 Method for Measuring Relative Resistance to Impact Loading O. ASTM E2134 Standard Test Method for Evaluating the Tensile-Adhesion Performance of an Exterior Insulation and Finish System (EIFS)
P. ASTM E2430 Standard Specification For Expanded Polystyrene (“EPS”) Thermal Insulation Boards For Use In Exterior Insulation and Finish Systems (“EIFS”)
Q. ASTM E2485 Standard Test Method for Freeze/Thaw Resistance of Exterior Insulation and Finish Systems (EIFS) and Water Resistive Barrier Coatings R. ASTM E2486 Standard Test Method for Impact Resistance of Class PB and PI Exterior Insulation and Finish Systems (EIFS)
S. ASTM G155/ Accelerated Weathering for Exposure of Nonmetallic Materials G153
T. Fed. Spec. Coating,Textured (For Interior and Exterior Masonry Surfaces) TT-C-555B
U. MIL STD 810B Military Standard, Environmental Test Methods V. NFPA 259 Test Method for Potential Heat of Building Materials W. NFPA 268 Standard Test Method for Determining Ignitability of Exterior Wall Assemblies Using a Radiant Heat Energy Source
X. NFPA 285 Standard Method of Test for the Evaluation of Flammability characteristics of Exterior Nonload-bearing Wall Assemblies Containing Combustible Components Using the Intermediate-scale, Multistory Test Apparatus
1.04 SUBMITTALS
A. Submit Samples, Evaluation Reports, warranties and Certificates.
1.05 QUALITY ASSURANCE
A. Qualifications
1. All EIFS assembly materials must be manufactured or sold by a single-source manufacturer.
2. Applicator:
a. Must process a current manufacture’s certificate of education b. Must be experienced and competent in installation of plaster-like materials
1.06 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials in original packaging with manufacturer’s identification B. Storage: Store materials in a cool, dry location, out of sunlight, protected from weather and other harmful environment, and at a temperature above 40°F (4°C) and below 110°F (43°C) in accordance with manufacturer's instructions.
SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 3 of 6
1.07 SITE CONDITIONS
A. Installation Ambient Air Temperature: Minimum of 40°F (4°C) and rising, and remain so for 24 hours thereafter.
B. Substrate Temperature: Do not apply materials to substrates whose temperature are below 40°F (4°C) or contain frost or ice.
C. Inclement Weather: Do not apply materials during inclement weather unless appropriate protection is employed.
D. Sunlight Exposure: Avoid, when possible, installation of the materials in direct sunlight.
Application of Acrylic Finishes in direct sunlight in hot weather may adversely affect aesthetics.
E. Materials shall not be applied if ambient temperature exceeds 120°F (49°C) or falls below 40°F (4°C) within 24 hours of application. Protect materials from uneven and excessive evaporation during hot, dry weather.
F. Prior to installation, the substrate shall be inspected for surface contamination, or other defects that may adversely affect the performance of the materials and shall be free of residual moisture.
1.08 WARRANTY
A. Warranty: Manufacturer’s 5 Year Warranty.
PART 2 PRODUCTS
2.01 MATERIALS
A. Manufacturer, Basis of Design: Parex USA, Inc.
2.02 MATERIALS
A. Adhesives:
1. Parex 302 ABC-N1 Base Coat & Adhesive: 100% acrylic polymer base, ready to use, applied without the addition of cement.
B. Insulation Board: In compliance with manufacturer’s requirments for Standard System EIFS.
1. Produced and labeled under a third party quality program as required by applicable building code; and produced by a manufacturer approved by Parex USA.
2. Shall conform to ASTM C578 and ASTM E2430, Type I and the Parex USA specification for Molded Expanded Polystyrene Insulation board.
3. Maximum size shall be 2 ft x 4 ft (610 mm x 1219 mm).
4. Thickness: 3/4 in, minimum (19 mm) after rasping.
C. Base Coats:
1. 302 ABC-N1 Base Coat & Adhesive: 100% acrylic polymer base, ready to use, applied without the addition of cement.
SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 4 of 6
D. Reinforcing Mesh:
1. 358.10 Intermediate Impact 10 Mesh: Wight 12 oz per sq. yd. (407 g/sq m) Reinforcing mesh used with a Standard Sustem, to achieve ASTM E2486 intermediate impact strength.
2. 356 Short Detail Mesh: Reinforcing mesh used for backwrapping and details.
E. Primer:
1. Parex USA Primer: 100% acrylic based coating to prepare surfaces for acrylic or elastomeric finishes.
2. Variance VariPrime Sanded: 100% acrylic based coating to prepare surface for exposed aggregate specialty finishes
F. Finish:
1. Parex USA Variance. Acrylic-based specialty finish. Finish type, texture, and color per Section 09 06 00 Schedules for Finishes.
2. Parex USA Clear Sealer: 100% acrylic, transparent, permeable, dirt resistant sealter for use as a protective coating over acrylic finishes. Use 600 Clear or Matte Clear.
a. Variance Antiquing Gel: a water-based, tinted, semi-transparent, acrylic emulsion for staining, sealing, and protecting concrete, masonry and other cementitious substrates. Use as required to achieve desired finish.
3. Parex USA Clear Sealer: 100% acrylic, transparent, permeable, dirt resistant sealer for use as a protective coating over acrylic finishes. Use 600 Clear or 610 Matte Clear.
G. Portland Cement: ASTM C150, Type I or Type I-II.
H. Water: Clean, cool, potable water.
2.03 RELATED MATERIALS AND ACCESSORIES
A. Substrate Material: Concrete
B. Sealant System:
1. Sealant for expansion joints between panelized EIFS sections shall be ultra-low modulus designed for minimum 100% elongation and minimum 50% compression and as selected by Project Designer.
2. Sealant for perimeter seals around window and door frames and other wall penetrations shall be low modulus, designed for minimum 50% elongation and minimum 25% compression, and as selected by Project Designer.
3. Sealants shall conform to ASTM C 920, Grade NS.
4. Expansion joints between sections of EIFS shall have a minimum width of 3/4 in (19 mm).
5. Perimeter seal joints shall be a minimum width of 1/2 in (12.7 mm).
SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 5 of 6
6. Sealant backer rod shall be closed-cell polyethylene foam.
7. Apply sealant to tracks or base coat of EIFS.
8. Refer to EIFS manufacturer’s current bulletin for listing of sealants which have been tested and have been found to be compatible with EIFS materials.
9. Joint design, surface preparation, and sealant primer shall be based on sealant manufacturer's recommendations and project conditions.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify project site conditions.
B. Compliance: Comply with manufacturer’s instructions for installation.
C. Substrate Examination: Examine prior to installation of EIFS assembly materials as follows:
1. Substrate shall be examined for soundness, and other harmful conditions.
2. Substrate shall be free of dust, dirt, laitance, efflorescence, and other harmful contaminants.
D. Sealants and Backer Rod: To be installed, where required, in accordance with the sealant manufacturer's specifications and published literature, and using the sealant manufacturers recommended primers.
E. Advise Contractor of discrepancies preventing proper installation of the EIFS materials.
Do not proceed with the work until unsatisfactory conditions are corrected.
3.02 PREPARATION
A. Protection: Protect surrounding material surfaces and areas during installation of system.
B. Clean surfaces thoroughly prior to installation.
C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
3.03 MIXING
A. Mix materials in accordance with manufacturer’s instructions.
3.04 APPLICATION
A. General: Installation shall conform to this specification and manufacturer’s written instructions.
B. Insulation Board:
1. Install back-wrap mesh or edge-wrap mesh at system terminations.
2. Apply EIFS adhesive to backs of insulation boards with a notched trowel, with ribbons of adhesive oriented in a vertical direction (parallel to the 2 ft (61 mm) dimension of the EPS board).
SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 6 of 6
3. Install insulation board without gaps in a running bond pattern and interlocked at corners.
4. Rasp irregularities off insulation board after adhesive has dried a minimum of 24 hours.
C. Apply base coat and fully embed mesh in base coat; include diagonal mesh patches at corners of openings and reinforcing mesh patches at joints of track sections. Apply multiple layers of base coat and mesh where required for specified impact resistance classification.
D. Apply primer to base coat after drying. Primer may be omitted if it is not required by the manufacturer's product data sheets for the specified finish coat or otherwise specified for the project.
E. Finish Coat: Apply finish coat to match specified finish type, texture, and color. Do not apply finish coat to surfaces to receive sealant. Keep finish out of sealant joint gaps.
3.05 CLEAN-UP
A. Removal: Remove and legally dispose of EIFS materials from job site.
B. Clean surfaces and work area of foreign materials resulting from material installation.
3.06 PROTECTION
A. Provide protection of installed materials from water infiltration into or behind them.
B. Provide protection of installed materials from dust, dirt, precipitation, and freezing during installation, and continuous high humidity until fully cured and dry.
C. Clean exposed surfaces using materials and methods recommended by the manufacturer of the material or product being cleaned. Remove and replace work that cannot be cleaned to the satisfaction of the Project Designer/Owner.
END OF SECTION 07 24 00
SECTION 07 26 16 UNDERSLAB VAPOR RETARDER
UNDERSLAB VAPOR RETARDER 07 26 16 - 1 of 2
PART 1 GENERAL
1.01 SUMMARY
A. Vapor retarder under concrete slabs on grade.
1.02 RELATED SECTIONS
A. All Sections listed in the Table of Contents are a Condition of this Section.
1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Product Data: Submit for vapor retarder sheet and installation accessories. Include data from tests performed within 18 months of submittal showing compliance with specified standard.
C. Shop Drawings: Show extent of vapor retarder work. Include details for edges at walls, grade beams, and the like. Include details for penetrating elements including conduit, piping, and structural membranes.
PART 2 PRODUCTS
2.01 VAPOR RETARDER
A. Plastic Sheet Vapor Retarder: Meeting ASTM E 1745, Class A. Minimum 15 mil thick polyolefin sheet.
Acceptable types include:
1. Stego Wrap by Stego Industries
2. Moistop Ultra A by Fortifiber Corp
3. VaporBlock 15 by Raven Industries
4. Perminator by W.R. Meadows
B. Accessory Products
1. Provide manufacturer’s recommended self-adhesive plastic seam tape for seams and penetrations.
2. Penetration boots: Provide manufacturer’s recommended accessory system for sealing pipe and conduit penetrations.
SECTION 07 26 16 UNDERSLAB VAPOR RETARDER
UNDERSLAB VAPOR RETARDER 07 26 16 - 2 of 2
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that surface to receive vapor retarder is compacted and trimmed smooth.
B. Verify that all work that will penetrate vapor retarder is complete and rigidly installed.
C. Confirm locations and details of vapor retarder termination.
3.02 VAPOR RETARDER INSTALLATION
A. General: Comply with requirements of ASTM E 1643 and manufacturer’s published instructions.
B. Place plastic sheet vapor retarder directly on compacted granular fill. Place sheeting with longest dimension parallel with direction of pour.
C. Lap joints 6 inches and seal with per manufacturer’s recommendations with pressure sensitive tape.
D. Tape seal vapor retarder at all perimeters.
E. Tape seal vapor retarder around columns, pipe, and conduit penetrations.
F. Avoid cutting or puncturing vapor retarder/barrier during reinforcement placement and concreting operations. Repair damages before placing concrete.
END OF SECTION
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 1 of 7
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes: Provide materials and accessories as required for complete installation.
1. Surface preparation.
2. Application of liquid applied vapor permeable air barrier. May be referred to weather resistive barrier on Drawings.
3. Application of materials to provide bridge and seal air leakage pathways in a. Wall and roof connections and penetrations.
b. Walls, windows, louvers or doors
c. All other penetrations through the wall assembly.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 REFERENCES
A. ASTM D412-98a(2002)e1 - Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers-Tension.
B. ASTM E96-00e1 (Method B) - Standard Test Methods for Water Vapor Transmission of Materials.
C. ASTM E283-91 (1999) - Standard Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.
D. ASTM E783 - Standard Test Method for Field Measurement of Air Leakage through Installed Exterior Windows and Doors.
E. ASTM E1105 - Standard Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform or Cyclic Static Air Pressure Difference.
F. ASTM E2178-01 - Standard Test Method for Air Permeance of Building Materials.
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 2 of 7
G. ASTM E2357 - 05 Standard Test Method for Determining Air Leakage of Air Barrier Assemblies.
1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Product Data: Furnish manufacturer's literature for each type of insulation.
1. Product Data: Include manufacturer's written instructions for evaluating, preparing, and treating substrate; technical data; and tested physical and performance properties of air barrier.
2. Shop Drawings: Show locations and extent of air barrier. Include details for substrate joints and cracks, counterflashing strip, penetrations, inside and outside corners, terminations, and tie-ins with adjoining construction. Include details of interfaces with other materials that form part of air barrier.
3. Use an experienced installer and adequate number of skilled personnel who are thoroughly trained and experienced in the application of the air barrier.
4. Obtain air/vapor barrier materials from a single manufacturer regularly engaged in manufacturing the product.
5. Provide products which comply with all state and local regulations controlling use of volatile organic compounds (VOCs).
1.05 MOCK-UP
A. Before beginning installation of air barrier, build mockups of exterior wall assembly, full height by ten (10) feet wide, including parapet, backup wall construction, external cladding, window, door frame and sill, insulation, and flashing to demonstrate surface preparation, crack and joint treatment, and sealing of gaps, terminations, and penetrations of air barrier membrane.
1. Coordinate construction of mockup to permit inspection of air barrier before external insulation and cladding is installed.
2. Reconstruct mockups do not comply with requirements.
3. Approved mockups may become part of the completed.
4. Include installers of other construction connecting to air barrier, including roofing, waterproofing, composite metal wall panels, metal wall panels, sealants, windows, glazed curtain walls, and door frames.
5. Review air barrier requirements including surface preparation, substrate condition and pretreatment, minimum substrate curing period, forecasted weather conditions, special details and sheet flashings, mockups, installation
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 3 of 7
procedures, sequence of installation, testing and inspecting procedures, and protection and repairs.
1.06 DELIVERY, STORAGE AND HANDLING
A. Store liquid materials in their original undamaged packages in a clean, dry, protected location and within temperature range required by air barrier manufacturer.
B. Store at temperatures at or above 40oF (4oC), free from contact with cold or frozen surfaces.
C. Remove and replace liquid materials that cannot be applied within their stated shelf life.
D. Protect stored materials from direct sunlight.
E. Protect materials during handling and application to prevent damage or contamination.
1.07 ENVIRONMENTAL REQUIREMENTS
A. Product not intended for uses subject to abuse or permanent exposure to the elements.
B. Do not proceed with product application if rainfall is forecast or imminent within 12 hours.
C. Do not apply membrane when air or surface temperatures are below 40oF (4oC).
D. Do not apply when air, material and surface temperatures are expected to fall below 32º F (0º C) within 24 hours of completed application.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Carlisle
B. Grace
C. Henry
D. Rubber Polymer Corporation
E. Tremco
F. W.R. Meadows
2.02 FLUID-APPLIED MEMBRANE AIR BARRIER
A. Fluid-Applied, Vapor Impermeable Membrane Air Barrier: Two-component, self-curing synthetic-rubber-based membrane, free of solvents, isocyanates and bitumen, suitable for spray application to wet film and dry film thickness of 60 mils.
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 4 of 7
B. Basis-of-Design Product: Products specified to establish required level of performance, quality, and appearance are by Grace Construction Products, Perm-A-Barrier.
2.03 AUXILIARY MATERIALS
A. General: Auxiliary materials recommended by air barrier manufacturer for intended use and compatible with air barrier membrane. Liquid-type auxiliary materials shall comply with VOC limits.
B. Transition Membrane Primer: Grace Construction Products; "Perm-A-Barrier WB Primer." Liquid primer recommended for substrate by manufacturer of air barrier material when applying flashing and transition membranes directly to substrate.
C. Flashing and Transition Membrane: Grace Construction Products; "Perm-A-Barrier Wall Flashing."Modified bituminous, 40-mil thick, self-adhering sheet consisting of 32 mils of rubberized asphalt laminated to an 8-mil thick, cross-laminated polyethylene film with release liner backing.
D. Modified Bituminous Transition Membrane: Grace Construction Products; "Perm-ABarrier Detail Membrane." Vapor-retarding, 40-mil- thick, smooth-surfaced, self-adhering; consisting of 36 mils of rubberized asphalt laminated to a 4-mil-thick polyethylene film with release liner backing.
E. Joint Reinforcing Strip: Sheathing manufacturer's glass-fiber-mesh tape.
F. Substrate Patching Membrane: Manufacturer's standard trowel-grade single component substrate filler.
G. Adhesive and Tape: Air barrier manufacturer's standard adhesive and pressure-sensitive adhesive tape.
H. Stainless-Steel Sheet: ASTM A 240/A 240M, Type 304, 0.0250-inch-thick, and Series 300 stainless-steel fasteners.
I. Sprayed Polyurethane Foam Sealant: 1- or 2-component, foamed-in-place, polyurethane foam sealant, 1.5 to 2.0 lb/cu. ft. density; flame spread index of 25 or less according to ASTM E 162; with primer and noncorrosive substrate cleaner recommended by foam sealant manufacturer.
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine surfaces to receive membrane. Notify Architect if surfaces are not acceptable.
Do not begin surface preparation or application until unacceptable conditions have been corrected.
B. Verify that substrates are sound and free of oil, grease, dirt, excess mortar, or other contaminants.
C. Verify that sheathing is attached with proper fasteners and spacing.
D. Proceed with installation only after unsatisfactory conditions have been corrected.
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 5 of 7
3.02 SURFACE PREPARATION
A. Protect adjacent surfaces not designated to receive air barrier.
B. Clean and prepare surfaces to receive air barrier membrane in accordance with manufacturer's instructions.
C. Do not apply membrane to surfaces unacceptable to manufacturer.
D. Patch all holes and voids and smooth out any surface misalignments.
E. Insure joints between dissimilar building materials are sealed with a strip of self-adhesive membrane 10" wide minimum, centered over the joint.
F. Exterior Sheathing Panels:
1. Panels are to be fastened according to sheathing panel manufacturer.
2. Fill all panel joint with detailing compound prior to full application.
3. Gypsum Sheathing: Fill joints greater than 1/4 inch with sealant according to ASTM C 1193 and with air barrier manufacturer's written instructions. Apply first layer of fluid air barrier membrane at joints. Tape joints with joint reinforcing strip after first layer is dry. Apply a second layer of fluid air barrier membrane over joint reinforcing strip.
G. Cover gaps in substrate plane and form a smooth transition from one substrate plane to another with stainless-steel sheet mechanically fastened to structural framing to provide continuous support for air barrier.
3.03 TRANSITION MEMBRANE INSTALLATION
A. Install strips, transition membrane, and auxiliary materials according to air barrier manufacturer's written instructions to form a seal with adjacent construction and maintain a continuous air barrier.
B. Coordinate the installation of air barrier with installation of roofing membrane and base flashing to ensure continuity of air barrier with roofing membrane.
C. Install modified bituminous transition membrane on roofing membrane or base flashing so that a minimum of 3 inches of coverage is achieved over both substrates.
D. Apply primer to substrates at required rate and allow to dry. Limit priming to areas that will be covered by air barrier sheet in same day. Re-prime areas exposed for more than 24 hours.
E. Prime glass-fiber-surfaced gypsum sheathing with number of prime coats needed to achieve required bond, with adequate drying time between coats.
F. Connect and seal exterior wall air barrier membrane continuously to roofing membrane air barrier, floor-to floor construction, exterior glazing and window systems, glazed curtain-wall systems, storefront systems, exterior louvers, exterior door framing, and other construction used in exterior wall openings.
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 6 of 7
G. At end of each working day, seal top edge of strips and transition membranes to substrate with termination mastic.
H. Apply joint sealants forming part of air barrier assembly within manufacturer's recommended application temperature ranges. Consult manufacturer when sealant cannot be applied within these temperature ranges.
I. Wall Openings: Prime concealed perimeter frame surfaces of windows, curtain walls, storefronts, doors and louvers. Apply modified bituminous transition membrane so that a minimum of 6 inches of coverage is achieved over both substrates. Maintain 6 inches of full contact over firm bearing to perimeter frames with not less than 2 inches of full contact.
J. Modified Bituminous Transition Membrane: Roll firmly to enhance adhesion.
K. Preformed Silicone-Sealant Extrusion: Set in full bed of silicone sealant applied to walls, frame, and membrane.
L. Fill gaps in perimeter frame surfaces of windows, curtain walls, storefronts, and doors, and miscellaneous penetrations of air barrier membrane with foam sealant.
M. Seal exposed edges of strips at seams, cuts, penetrations, and terminations not concealed by metal counter-flashings or ending in reglets with termination mastic.
N. Repair punctures, voids, and deficient lapped seams in strips and transition membranes.
Slit and flatten fish-mouths and blisters. Patch with transition membranes extending 10 inches beyond repaired areas in membrane direction.
3.04 AIR BARRIER MEMBRANE INSTALLATION
A. Apply air barrier membrane to form a seal with strips and transition membranes and to achieve a continuous air barrier according to air barrier manufacturer's written instructions.
B. Apply air barrier at walls, soffits and fascia to roof barrier.
C. Apply within manufacturer's recommended application temperature ranges.
D. Apply primer to substrates at required rate and allow to dry. Limit priming to areas that will be covered by air barrier sheet in same day. Re-prime areas exposed for more than 24 hours.
E. Prime glass-fiber-surfaced gypsum sheathing with number of prime coats needed to achieve required bond, with adequate drying time between coats.
F. Apply a continuous unbroken air barrier to substrates according to the following minimum thickness. Apply membrane in full contact around protrusions.
G. Vapor-Impermeable Membrane Air Barrier: 60-mil wet film thickness, 60-mil dry film thickness.
SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 7 of 7
H. Apply strip and transition membrane overlapping or onto according to air barrier manufacturer's written instructions.
I. Do not cover air barrier until it has been tested and inspected by testing agency.
J. Correct deficiencies in or remove air barrier that does not comply with requirements; repair substrates and reapply air barrier components.
3.05 CLEANING AND PROTECTION
A. Protect air barrier system from damage during application.
B. Protect air barrier from exposure to UV light and harmful weather exposure as required by manufacturer. Remove and replace vapor-impermeable air barrier exposed for more than 60 days.
C. Keep barrier from contact with creosote, uncured coal-tar products, TPO, EPDM, flexible PVC membranes, and sealants not approved by air barrier manufacturer.
D. Clean spills, stains, and soiling from construction that would be exposed in the completed work using cleaning agents and procedures recommended by manufacturer of affected construction.
E. Remove masking materials after installation.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 514 of 1257
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 1 of 11 PART 1 GENERAL
1.01 DESCRIPTION
A. Thermoplastic Polyolefin (TPO) sheet roofing mechanically fastened to roof deck.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced.
Publications are referenced in the text by the basic designation only. Editions of applicable publications current on date of issue of bidding documents apply unless otherwise indicated.
B. American National Standards Institute/Single-Ply Roofing Institute (ANSI/SPRI):
ANSI/SPRI ES-1-03 ...... Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems.
C. American Society of Civil Engineers/Structural Engineering Institute (ASCE/SEI):
ASCE/SEI-7-10 ............. Minimum Design Loads for Buildings and Other Structures D. ASTM International (ASTM):
C1371-04 ...................... Standard Test Method for Determination of Emittance of Materials Near Room Temperature Using Portable
Emissometers
C1549-04 ...................... Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a Portable Solar
Reflectometer
D6878-08 ...................... Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing
E108-10 ......................... Standard Test Methods for Fire Tests of Roof Coverings E408-71(R2008) ............ Standard Test Methods for Total Normal Emittance of Surfaces Using Inspection-Meter Techniques
E1980-01 ....................... Standard Test Method for Measuring Solar Reflectance of Horizontal and Low-Sloped Surfaces in the Field
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 2 of 11 E 2430 -05. . . . . . . Rigid Polystyrene Insulation
C 168. . . . . . . . . .Test method for Thermal Insulation C 177. . . . . . . . . .Test for Steady State Heat flux Measurements, and Thermal insulation E. American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) ASHRAE 90.1-2007 ...... Energy Standard for Buildings Except Low-Rise Residential Buildings, Appendix f.
F. Cool Roof Rating Council:
CRRC-1 ......................... Product Rating Program, www.coolroofs.org G. FM Approvals: Roof Nav Approved Roofing Assemblies and Products. 1-28-09 .......................... Loss Prevention Data Sheet: Design Wind Loads. 1-29-09 .......................... Loss Prevention Data Sheet: Above-Deck Roof Components H. National Roofing Contractors Association: Roofing and Waterproofing Manual I. U.S. Department of Energy (DoE): Roof Products Qualified Product List, www.energystar.gov
1.04 PERFORMANCE REQUIREMENTS
A. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by membrane roofing manufacturer based on testing and field experience.
B. Roofing System Energy Performance Requirements: Provide a roofing system identical to components that that have been successfully tested by a qualified independent testing and inspecting agency to meet the following requirements:
C. Energy Performance, Energy Star: Provide roofing system that is listed on DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products. www.energystar.gov.
1. Solar Reflectance Index: Not less than 82 when calculated according to ASTM E1980 based on testing identical products by a qualified testing agency. www.coolroofs.com.
1.05 QUALITY CONTROL
A. Installer Qualifications:
1. Licensed or approved in writing by manufacturer to perform work under warranty requirements of this Section.
2. Employ full-time supervisors knowledgeable and experienced in roofing of similar types and scopes, and able to communicate with owner and workers.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 3 of 11 B. Inspector Qualifications: Inspection of work by third-party technical inspector or technical representative of manufacturer experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control Article, to determine Installer’s compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be an independent party certified as a Registered Roof Observer by the Roof Consultants Institute (RCI), retained by the Contractor and approved by the Manufacturer
C. Product/Material Requirements:
1. Obtain products from single manufacturer or from sources recommended by manufacturer for use with roofing system and incorporated in manufacturer's warranty.
D. Roofing system design standard requirements:
1. Recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to Thermoplastic Polyolefin (TPO) roofing for storage, handling and application.
2. Recommendations of FM Approvals 1-49 Loss Prevention Data Sheet for Perimeter Flashings.
3. Recommendations of ANSI/SPRI ES-1 for roof edge design.
4. Roofing System Design: Provide roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE/SEI 7. a. Corner Uplift Pressure: (75 lbf/sq. ft.).
b. Perimeter Uplift Pressure: (75 lbf/sq. ft.).
c. Field-of-Roof Uplift Pressure: (75 lbf/sq. ft.).
5. FM Approvals Listing: Provide roofing membrane, base flashing, and component materials that comply with requirements in FM Approvals 4450 and FM Approvals 4470 as part of a roofing system and that are listed in FM Approvals "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals markings.
a. Fire/Windstorm Classification: Class 1A-75.
b. Hail Resistance: MH.
E. Pre-Roofing Meeting:
1. Prior to roofing, discuss specific expectations and responsibilities, construction procedures, specification requirements, application, environmental conditions, job and surface readiness, material storage, and protection with COR to:
a. Verify that work of other trades which penetrates roof deck is completed.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 4 of 11 b. Determine adequacy of deck anchorage, presence of foreign material, moisture and unlevel surfaces, or other conditions that would prevent application of roofing system from commencing or cause a roof failure. c. Examine samples and installation instructions of manufacturer.
1.06 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, SAMPLES.
B. Product Data:
1. Adhesive materials.
2. Membrane sheet roofing and flashing membrane.
3. Roof Insulation
3. Fastening requirements.
4. Application instructions.
C. Samples:
1. Nails and fasteners, each type.
D. Shop Drawings: Include plans, sections, details, and attachments.
1. Base flashings and terminations.
2. Layout of insulation, crickets, edge conditions and roof drains, scuppers etc.
E. Certificates:
1. Indicating materials and method of application of roofing system meets requirements of FM Approvals "RoofNav" for specified fire/windstorm classification.
2. Indicating compliance with energy performance requirement.
3. Labatory test reports: Thermal values of insulation products.
4. Indicating Thermal conductance, and minimum average thickness of insulation.
F. Warranty: As specified.
G. Documentation of supervisors' and inspectors' qualifications.
H. Field reports of roofing inspector.
I. Contract Close-out Submittals:
1. Maintenance Manuals.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 5 of 11
2. Warranty signed by installer and manufacturer.
1.07 DELIVERY, STORAGE AND HANDLING
A. Comply with the recommendations of the NRCA “Roofing and Waterproofing Manual” applicable to single ply membrane roofing for storage, handling and installation.
1.08 ENVIRONMENTAL REQUIREMENTS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.
1.09 WARRANTY
A. Roofing work subject to 10 years.
1.10 QUALITY ASSURANCE:
A. Roof insulation on steel deck shall have a flame spread rating no greater than 75 and a smoke developed rating not greater than 150, exclusive of covering, when tested in accordance with ASTM E 84, or shall have successfully passed FM Approvals 4450.
PART 2 PRODUCTS
2.01 TPO MEMBRANE ROOFING
A. TPO Sheet: ASTM D6878, internally fabric or scrim reinforced, 1.5 mm (60 mils) thick, with no backing.
B. Color: White.
2.02 ACCESSORIES
A. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as TPO sheet membrane.
B. Bonding Adhesive: Manufacturer's standard, water based.
C. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 25 by 3 mm (1 by 1/8 inch) thick; with anchors.
D. Metal Battens: Manufacturer's standard, aluminum-zinc-alloy-coated or zinc-coated steel sheet, approximately 25 mm wide by 1.3 mm (1 inch wide by 0.05 inch) thick, prepunched.
E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with FM Approvals 4470, designed for fastening membrane to substrate.
G. Miscellaneous Accessories: Provide sealers, preformed flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, and other accessories acceptable to manufacturer.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 6 of 11 H. Roof and Deck Insulation.
2.03 ADHESIVE AND SEALANT MATERIALS
A. General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.
B. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.
PART 3 – EXECUTION
3.01 EXAMINATION
A. Examine substrates and conditions with roofing Installer and roofing inspector to verify compliance with project requirements and suitability to accept subsequent roofing work.
Correct unsatisfactory conditions before proceeding with roofing work.
B. Do not apply roofing if roof surface will be used for subsequent work platform, storage of materials, or staging or scaffolding will be erected thereon unless system is protected.
3.02 PREPARATION
A. Complete roof deck construction prior to commencing roofing work:
1. Install curbs, blocking, edge strips, nailers, cants, and other components where insulation, roofing, and base flashing is attached to, in place ready to receive insulation and roofing.
2. Complete deck and insulation to provide designed drainage to working roof drains.
3. Document installation of related materials to be concealed prior to installing roofing work.
B. Dry out surfaces, including the flutes of metal deck that become wet from any cause during progress of the work before roofing work is resumed. Apply materials to dry substrates.
C. Sweep decks to broom clean condition. Remove all dust, dirt or debris.
D. Remove projections that might damage materials.
3.04 INSTALLATION, GENERAL
A. FM Approvals Installation Standard: Install roofing membrane, base flashings, wood cants, blocking, curbs, and nailers, and component materials in compliance with requirements in FMG 4450 and FMG 4470 as part of a membrane roofing system as listed in FM Approval's "RoofNav" for fire/windstorm classification indicated. Comply with recommendations in FM Approvals' Loss Prevention Data Sheet 1-49, including requirements for nailers and cants.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 7 of 11 B. NRCA Installation Standard: Install roofing system in accordance with applicable NRCA Manual Plates and NRCA recommendations.
C. Manufacturer Recommendations: Comply with roofing system manufacturer's written installation recommendations.
D. Coordination with related work: Coordinate roof operations with roof insulation and sheet metal work so that insulation and flashings are installed concurrently to permit continuous roofing operations.
E. Installation Conditions:
1. Apply dry roofing materials. Apply roofing work over dry substrates and materials.
2. Apply materials within temperature range and surface and ambient conditions recommended by manufacturer.
3. Except for temporary protection, do not apply materials during damp or rainy weather, during excessive wind conditions, nor while moisture (dew, snow, ice, fog or frost) is present in any amount in or on the materials to be covered or installed:
a. Do not apply materials when the temperature is below 4 deg. C (40 deg.
F).
b. Do not apply materials to substrate having temperature of 4 deg. C (40 deg. F) or less.
3.05 RIGID INSULATION INSTALLATION
A. Insulation Installation, General:
1. Install roof insulation in accordance with roofing system manufacturer's written instructions.
2. Install roof insulation in accordance with requirements of FM Approval's Listing for specified roofing system.
3. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate prior to installation of insulation.
4. Cant Strips: Install preformed insulation cant strips strips at junctures of roofing system with vertical construction.
5. Use same insulation as existing for roof repair and alterations unless specified otherwise.
B. Insulation Thickness:
1. Thickness of roof insulation shown on drawings is nominal. Actual thickness shall provide the average thermal resistance "R" value of not less than that specified in Performance Requirements Article.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 8 of 11
2. Insulation on Metal Decks: Provide minimum thickness of insulation for metal decks recommended by the insulation manufacturer to span rib opening (flute size) of metal deck used. Support edges of insulation on metal deck ribs.
3. When thickness of insulation to be used is more or less than that shown on the drawings, make adjustments in the alignment and location of roof drains, flashing, gravel stops, fascias and similar items at no additional cost to the Owner.
4. Where tapered insulation is used, the thickness of the insulation at high points and roof edges shall be as shown on the drawings; the thickness at the low point (drains) shall be not less than 38 mm (1-1/2 inches).
5. Use not less than two layers of insulation when insulation is 68 mm (2.7 inch) or more in thickness unless specified otherwise. Stagger joints minimum 150 mm (6 inches).
C. Lay insulating units with close joints, in regular courses and with cross joints broken.
When laid in more than one layer, break joints of succeeding layers of roof insulation with those in preceding layer.
D. Lay units with long dimension perpendicular to the rolled (longitudinal) direction of the roofing felt.
E. Seal all cut edges at penetrations and at edges against blocking with bitumen or roof cement.
F. Cut to fit tight against blocking or penetrations.
G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.
3.06 INSTALLATION OF TPO ROOFING
A. Do not allow the membrane to come in contact with surfaces contaminated with asphalt, coal tar, oil, grease, or other substances which are not compatible with TPO.
B. Install the membrane so the sheets run perpendicular to the long dimension of the insulation boards.
C. Commence installation at the low point of the roof and work towards the high point. Lap the sheets so the flow of water is not against the edges of the sheet.
D. Position the membrane so it is free of buckles and wrinkles.
E. Roll sheet out on deck; inspect for defects as being rolled out and remove defective areas. Allow for relaxing before proceeding.
1. Lap edges and ends of sheets 50 mm (two inches) or more as recommended by the manufacturer.
2. Heat weld laps. Apply pressure as required. Seam strength of laps as required by ASTM D4434.
3. Check seams to ensure continuous adhesion and correct defects.
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 9 of 11
4. Finish edges of laps with a continuous beveled bead of sealant to sheet edges to provide smooth transition.
5. Finish seams as the membrane is being installed (same day).
6. Anchor perimeter to deck or wall as specified.
F. Repair areas of welded seams where samples have been taken or marginal welds, bond voids, or skips occurs.
G. Repair fishmouths and wrinkles by cutting to lay flat and installing patch over cut area extending 100 mm (four-inches) beyond cut.
H. Membrane Perimeter Anchorage:
1. Install metal fastening strip at the perimeter of each roof level, curb flashing, expansion joints and similar penetrations as indicated and in accordance with membrane manufacturer's instructions on top of roof membrane to deck or wall.
2. Mechanically Fastened Metal Fastening Strip:
a. Set top of mechanical fastener set flush with top surface of the metal fastening strip. Space mechanical fasteners a maximum 300 mm (12 inches) on center starting 25 mm (one inch) from the end of the nailing strip.
b. When strips are cut round corners and eliminate sharp corners. c. After mechanically fastening strip cover and seal strip with a six-inch wide roof membrane strip; heat weld to roof membrane and seal edges. d. At roof edge metal, turn the membrane down over the front edge of the blocking or the nailer to below blocking. Secure the membrane to the vertical portion of the nailer; or, if required by the membrane manufacturer with fasteners spaced not over 300 mm (12 inches) on centers.
e. At parapet walls, intersecting building walls and curbs, secure the membrane to the structural deck with fasteners 300 mm (12 inches) on centers or as shown on NRCA manual.
I. Mechanically-Attached System:
1. Secure the membrane to the structural deck with fasteners through stress plate or batten strips spaced and patterned in accordance with the membrane manufacturer's instructions to achieve specified wind uplift performance.
2. When fasteners are installed within the laps of adjoining sheets, position the fastener so that the stress plates are a minimum 13 mm (1/2)inch) from the edge of the sheets.
3. Where fasteners are installed over the membrane after the seams have been welded, cover the fasteners with a minimum 175 mm (seven inch) wide round TPO membrane cap centered over the fasteners. If batten strips are used cover the strip with a minimum 175 mm (seven inch) wide TPO strip centered over the
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 10 of 11 batten. Heat weld to the roof membrane and finish edges with sealant as specified. Finish edges with sealant as specified.
4. Before installing fasteners into cast in place concrete, pre-drill the correct size hole into the deck. Drill the hole 9 mm (3/8 inch) deeper than the fastener penetration.
3.07 INSTALLATION OF FLASHING
A. Install flashings as the membrane is being installed. If the flashing cannot be completely installed in one day, complete the installation until the flashing is in a watertight condition and provide temporary covers or seals.
B. Flashing Roof Drains:
1. Install roof drain flashing as recommended by the membrane manufacturer, generally as follows:
a. Coordinate to set the metal drain flashing in asphalt roof cement, holding cement back from the edge of the metal flange.
b. Do not allow the roof cement to come in contact with the TPO roof membrane.
c. Adhere the TPO roof membrane to the metal flashing with the membrane manufacturer's recommended adhesive.
2. Turn down the metal drain flashing and TPO roof membrane into the drain body and install clamping ring and strainer.
C. Installing TPO Base Flashing and Pipe Flashing:
1. Install TPO flashing membranes to pipes, wall or curbs to a height not less than eight-inches above roof surfaces and 100 mm (four inches) on roof membrane. a. Adhere flashing to pipe, wall or curb with adhesive. b. Form inside and outside corners of TPO flashing membrane in accordance with NRCA manual. Form pipe flashing in accordance with NRCA manual use pipe boot.
c. Lap ends not less than 100 mm (four inches).
d. Heat weld flashing membranes together and flashing membranes to roof membranes. Finish exposed edges with sealant as specified. e. Install flashing membranes in accordance with NRCA manual.
2. Anchor top of flashing to walls or curbs with fasteners spaced not over 200 mm (eight inches) on centers. Use fastening strip on ducts. Use pipe clamps on pipes or other round penetrations.
3. Apply sealant to top edge of flashing.
D. Installing Building Expansion Joints:
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 11 of 11
1. Install base flashing as shown.
2. Coordinate installation with metal expansion joint cover or roof expansion joint system.
E. Repairs to membrane and flashings:
1. Remove sections of TPO sheet roofing or flashing that is creased wrinkled or fish-mouthed.
2. Cover removed areas, cuts and damaged areas with a patch extending 100 mm (four inches) beyond damaged, cut, or removed area. Heat weld to roof membrane or flashing. Finish edge of lap with sealant as specified.
3.08 FIELD QUALITY CONTROL
A. Roofing Inspector: Contractor will engage a qualified roofing inspector to perform roof tests and inspections and to prepare test reports.
1. Examine and probe seams in the membrane and flashing in the presence of Architect, Owner and Membrane Manufacturer's Inspector.
2. Probe edge of welded seams with a blunt tipped instrument. Use sufficient hand pressure to detect marginal welds, voids, skips, and fish-mouths.
C. Final Roof Inspection:
1. Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion.
2. Notify Architect and Owner 7 days in advance of date and time of inspection.
D. Repair or remove and replace components of roofing work where test results or inspections indicate that they do not comply with specified requirements. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.
3.09 PROTECTING AND CLEANING
A. Protect membrane roofing system from damage and wear during remainder of construction period.
B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements; repair substrates; and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of acceptance by Owner.
C. Clean overspray and spillage from adjacent construction. Clean membrane and restore surface to like-new condition meeting solar reflectance requirements.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 526 of 1257
SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 1 of 4
PART 1 GENERAL
1.01 SUMMARY
A. Provide metal flashings and sheet metal including accessories as required for complete weather tight installation.
B. Patch existing flashing and sheet metal as required by new construction.
C. Provide concealed sealants used in conjunction with installation of metal flashing and sheet metal.
D. Provide miscellaneous sheet metal flashing and reglets not provided by other trades or suppliers.
1. Where reglets are to be installed in conjunction with other work, provide in adequate time for installation.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Product Data: Furnish literature for manufactured products.
C. Shop Drawings: Clearly indicate dimensioning, layout, general construction details including closures, flashings, locations and types of sealants, anchorages, and method of anchorage.
D. Samples: Furnish samples of typical metal flashing fabrication indicating standard soldered joints and edge conditions.
1.04 QUALITY ASSURANCE
A. Referenced Standards
1. California Building Code (CBC), Latest Edition
2. Sheet Metal and Air Conditioning Contractors National Association (SMACNA):
Architectural Sheet Metal Manual, Latest Edition
SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 2 of 4
B. Design Requirements: Allow for movement of components without causing buckling, failure of joint seals, undue stress on fasteners or other detrimental effects, when subject to 100-year seasonal temperature ranges.
C. Sheet metal fabricator and installer shall have a minimum five (5) years of experience with shop fabrication and installation of shop-fabricated roofing metal and flashings.
1.05 DELIVERY, STORAGE AND HANDLING
A. Provide strippable film protective covering on shop finished flashing materials to protect materials through shipping, fabrication and installation.
1.06 WARRANTY
A. Special Warranty: Provide for correcting failure of metal flashing system to resist penetration of water and damage from wind.
1. Special Warranty Period: Two years.
PART 2 PRODUCTS
2.01 MATERIALS
A. Flashing and Sheet Metal:
1. Minimum gauge of aluminum per SMACNA. Minimum gauge of gutters, downspouts and roof edge, .040 aluminum, 20ga.
B. Flexible Flashings: Reinforced self- adhered flexible flashing.
C. Solder and Fasteners: As recommended by SMACNA and complying with applicable codes and regulations; hot dipped galvanized minimum coating comparable to G90.
D. Concealed Sealant: Butyl type for use in conjunction with sheet metal; non-staining; noncorrosive; non-shrinking and non-sagging; ultra-violet and ozone resistant for exterior concealed applications.
E. Bituminous Paint: Acid and alkali resistant type; black color; asbestos free.
F. Plastic Cement: Cutback asphaltic type; asbestos free.
G. Sealing Compound: Type recommended by roofing manufacturer; asbestos free.
H. Gaskets: Type suitable for use in conjunction with sheet metal; non-staining, noncorrosive, non-shrinking, non-sagging, ultra-violet resistant, and ozone resistant; for exterior concealed applications.
1. Manufacturers:
a. Sandell Manufacturing Co./Polytite Joint Sealant.
b. Emseal USA, Inc./Emseal Secondary Seal.
SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 3 of 4
2.02 FABRICATION
A. Fabricate sheet metal in accordance with SMACNA Architectural Sheet Metal Manual.
B. Form sections square, true and accurate to size, free from distortion and other defects detrimental to appearance or performance.
C. Fabricate corners and intersections in shop with solder joints; watertight fabrication.
D. Form sections in maximum 10'-0" lengths; make allowance for expansion at joints.
E. Hem exposed edges on underside 1/2".
F. Backpaint flashings with heavy bodied bituminous paint where in contact with cementitious materials or dissimilar metals.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install metal flashing and sheet metal in accordance with SMACNA Architectural Sheet Metal Manual.
1. Install tight in place, with corners square, surfaces true and straight in planes, and lines accurate to profiles as indicated on Drawings.
2. Lap joints in direction of water flow.
3. Install self-adhering flexible flashings and overlap metal flashing joints and adjacent materials in direction of water flow.
B. Exercise care when cutting materials on site, to ensure cuttings do not remain on finished surfaces.
C. Provide expansion joints concealed within system.
D. Use concealed fasteners, continuous cleat type, except where specifically approved by Architect.
1. Exposed fasteners may be used, where clearly indicated on shop drawings and approved by the Owner, at areas not exposed at exterior walls nor in sight of interior spaces.
E. Apply sealing compound at junction of metal flashing and felt flashing.
F. Lock seams and end joints; fit flashing tight in place; make corners square, surfaces true and straight in planes, and lines accurate to profiles.
G. Install flashings with minimum joints and as long of section as possible.
H. Install sealants where required to prevent direct weather penetration.
1. Install continuous gasket behind surface-applied reglets.
SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 4 of 4
I. Completed installation shall be free of rattles, noise due to thermal and air movement, and wind whistles.
J. Install metal flashing at all intersections to protect waterproofing, insulation and gypsum sheathing from UV exposure.
K. Install dam flashing at window, louvers, openings and at intersecting horizontal and vertical surfaces.
3.02 CLEANING
A. Remove protective coating from shop finished sheet metal when no longer required to protect roofing and flashing from construction.
B. Touch-up scratched and damaged finish to match new; remove and replace sheet metal units that cannot be repaired to look identical to adjacent sheet metal when viewed from 5'-0" away.
END OF SECTION
SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 1 of 4
PART 1 - GENERAL
1.1 SUMMARY
A. This section specifies the following materials and accessories as required for complete weathertight installation:
1. Copings.
1.2 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.3 SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For each type of roof specialty and for each color and texture specified.
C. Product Test Reports: For tests performed by a qualified testing agency.
D. Sample warranty.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing specialties to include in maintenance manuals.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer offering products meeting requirements that are FM Approvals listed for specified class.
1.6 WARRANTY
A. Roofing-System Warranty: Roof specialties are included in warranty provisions in Section 07 54 23 - Thermoplastic Polyolefin (TPO) Roofing.
SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 2 of 4
B. Special Warranty on Painted Finishes: Manufacturer agrees to repair finish or replace roof specialties that show evidence of deterioration of factory-applied finishes within specified warranty period.
1. Fluoropolymer Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D2244. b. Chalking in excess of a No. 8 rating when tested according to ASTM D4214. c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.
2. Finish Warranty Period: 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. FM Approvals' Listing: Manufacture and install copings that are listed in FM Approvals' "RoofNav" and approved for windstorm classification, Class 1-90 Identify materials with FM Approvals' markings.
B. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, hole elongation, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of thermal movements. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C) material surfaces.
2.2 COPINGS
A. Metal Copings: Manufactured coping system consisting of metal coping cap in section lengths not exceeding 12 feet (3.6 m), concealed anchorage; with corner units, end cap units, and concealed splice plates with finish matching coping caps.
1. Metallic-Coated Steel Sheet Coping Caps: Zinc-coated (galvanized) steel, nominal 0.034- inch (0.86-mm) thickness.
a. Surface: Smooth, flat finish.
b. Finish: Three-coat metallic fluoropolymer.
c. Color: Dark Bronze
2. Corners: Factory mitered and mechanically clinched and sealed watertight.
3. Coping-Cap Attachment Method: Face leg hooked to continuous cleat with back leg fastener exposed, fabricated from coping-cap material.
a. Face-Leg Cleats: Concealed, continuous stainless steel.
2.3 MATERIALS
A. Zinc-Coated (Galvanized) Steel Sheet: ASTM A653/A653M, G90 (Z275) coating designation.
SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 3 of 4
B. Stainless-Steel Sheet: ASTM A240/A240M or ASTM A666, Type 304.
2.4 MISCELLANEOUS MATERIALS
A. Fasteners: Manufacturer's recommended fasteners, suitable for application and designed to meet performance requirements, complying with FM Approvals 4470.
B. General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.
C. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.
2.5 FINISHES
A. Coil-Coated Galvanized-Steel Sheet Finishes:
1. High-Performance Organic Finish: Prepare, pretreat, and apply coating to exposed metal surfaces to comply with ASTM A755/A755M and coating and resin manufacturers' written instructions.
a. Three-Coat Metallic Fluoropolymer: AAMA 621. Fluoropolymer finish with suspended metallic flakes containing not less than 70 percent PVDF resin by weight in both color coat and clear topcoat.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. General: Install roof specialties according to manufacturer's written instructions. Anchor roof specialties securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, underlayments, sealants, and other miscellaneous items as required to complete roof-specialty systems.
1. Install roof specialties level, plumb, true to line and elevation; with limited oil-canning and without warping, jogs in alignment, buckling, or tool marks.
2. Provide uniform, neat seams with minimum exposure of solder and sealant.
3. Install roof specialties to fit substrates and to result in weathertight performance. Verify shapes and dimensions of surfaces to be covered before manufacture.
4. Torch cutting of roof specialties is not permitted.
5. Do not use graphite pencils to mark metal surfaces.
B. Metal Protection: Protect metals against galvanic action by separating dissimilar metals from contact with each other or with corrosive substrates by painting contact surfaces with bituminous coating or by other permanent separation as recommended by manufacturer.
1. Coat concealed side of stainless-steel roof specialties with bituminous coating where in contact with wood, ferrous metal, or cementitious construction.
2. Bed flanges in thick coat of asphalt roofing cement where required by manufacturers of roof specialties for waterproof performance.
SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 4 of 4
C. Expansion Provisions: Allow for thermal expansion of exposed roof specialties.
1. Space movement joints at a maximum of 12 feet (3.6 m) with no joints within 18 inches (450 mm) of corners or intersections unless otherwise indicated on Drawings.
2. When ambient temperature at time of installation is between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement each way. Adjust setting proportionately for installation at higher ambient temperatures.
D. Fastener Sizes: Use fasteners of sizes that penetrate substrate not less than recommended by fastener manufacturer to achieve maximum pull-out resistance.
E. Seal concealed joints with butyl sealant as required by roofing-specialty manufacturer.
F. Seal joints as required for weathertight construction. Place sealant to be completely concealed in joint. Do not install sealants at temperatures below 40 deg F (4 deg C).
3.2 COPING INSTALLATION
A. Install cleats, anchor plates, and other anchoring and attachment accessories and devices with concealed fasteners.
B. Anchor copings with manufacturer's required devices, fasteners, and fastener spacing to meet performance requirements.
1. Interlock face-leg drip edge into continuous cleat anchored to substrate at 16-inch (406- mm) centers. Anchor back leg of coping with screw fasteners and elastomeric washers at 16-inch (406-mm) centers.
3.3 CLEANING AND PROTECTION
A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.
B. Clean and neutralize flux materials. Clean off excess solder and sealants.
C. Remove temporary protective coverings and strippable films as roof specialties are installed.
END OF SECTION
SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 1 of 4
PART 1 GENERAL
1.01 SUMMARY
A. Provide labor, material, equipment and services to furnish and install firestopping systems required for the work as shown on the drawings, as specified herein and as required for a complete and proper installation, including, but not limited to, the following:
1. Closures of openings in walls, floors, and roof decks against penetration of flame, heat, and smoke or gases in fire resistant rated construction.
2. Closures of openings in walls against penetration of gases or smoke in smoke partitions.
3. Sealants around penetrations in non-rated smoke barriers where indicated on Drawings.
4. Closures of floor openings in vertical mechanical shafts against penetration of flame, heat, smoke and gases.
B. Drawings and General Provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification Sections, apply to this Section.
1.02 RELATED SECTIONS
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit in accordance with Section 01 33 00 – Submittals.
B. Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.
C. List of FM, UL, or WH classification number of systems installed.
D. Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.
1.04 DELIVERY AND STORAGE
A. Deliver materials in their original unopened containers with manufacturer’s name and product identification.
B. Store in a location providing protection from damage and exposure to the elements.
1.05 QUALITY ASSURANCE
A. FM, UL, or WH or other approved laboratory tested products will be acceptable.
SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 2 of 4
1.06 APPLICABLE STANDARDS: The latest edition of publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.
A. American Society for Testing and Materials (ASTM):
1. E84 Surface Burning Characteristics of Building Materials
2. E136 Behavior of Material in a Vertical Tube Furnace
3. E814 Fire Tests of Through-Penetration Fire Stops
B. Factory Mutual Engineering and Research Corporation (FM):
1. Annual Issue Approval Guide Building Materials
C. Underwriters Laboratories, Inc. (UL):
1. Annual Issue Building Materials Directory
2. Annual Issue Fire Resistance Directory
D. Warnock Hersey (WH):
1. Annual Issue Certification Listings
PART 2 PRODUCTS
2.01 FIRESTOP SYSTEMS
A. Metallic Pipe of Conduits: Firestop systems shall comply with the following:
1. Classified for use with the particular type of penetrating material used.
2. Use either factory built (Firestop Devices) or field erected (through-Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke.
3. Tested through-penetration firestop systems and firestop devices in accordance with ASTM E814 using the "T" rating to maintain the same rating and integrity as the fire barrier being sealed.
4. Products requiring heat activation to seal an opening by its intumescence shall exhibit a demonstrated ability to function as designed to maintain the fire barrier.
5. Firestop sealants used for firestopping or smoke sealing shall have following properties:
a. Contain no flammable or toxic solvents.
b. Have no dangerous or flammable outgassing during the drying or curing of products.
c. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.
SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 3 of 4
d. When used in exposed areas, shall be capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
6. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84.
7. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.
8. Materials to be asbestos free.
B. Glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials:
Comply to requirements for metallic pipe and as follows:
1. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.
2. Intumescent products which expand to seal the opening and act as fire, smoke, toxic fumes, and, water sealant.
C. One-Hour Fire Barrier Sealant: One-component neutral-cure silicone rubber sealant.
1. Manufacturers:
a. 3M “Fire Barrier 2000 or 2003 Sealant, Caulk Type CP25 or No. 303 Putty”;
b. International Protective Coatings “Flame-Safe FS500 or FSP1000 Putty”; c. Fipro “A/D Silicone Firebarrier Sealant-SL”;
d. Or equal.
2. Two Hour Fire Barrier Sealant: 3M CP25 Sealant.
2.02 SMOKE STOPPING IN SMOKE PARTITIONS
A. Non-Fire-rated Smoke Stop Partitions: Sealants around penetrations in smoke stop partitions or barriers not identified on the plans as part of a rated assembly shall comply as follows:
1. Use silicone sealant in smoke partitions as specified in Section 07 90 00, Joint Sealers.
2. Use mineral fiber filler and bond breaker behind sealant.
3. Sealants shall have a maximum flame spread of 25 and smoke developed of 50 when tested in accordance with E84.
4. When used in exposed areas capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
B. Fire-rated Smoke Stop Partitions: Sealants around penetrations in smoke stop partitions or barriers that are identified on the plans as part of a rated assembly shall comply as follows:
SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 4 of 4
1. Use listed firestop system specified above.
2.03 ACCESSORIES
A. Stuffing Material: Mineral fiber matting, permanent.
B. Retainers: Clips to support mineral fiber matting.
PART 3 EXECUTION
3.01 EXAMINATION
A. Submit product data and installation instructions, as required by article, submittals, after an on site examination of areas to receive firestopping.
B. Examine substrates and conditions for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of firestopping.
3.02 PREPARATION
A. Remove dirt, grease, oil, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.
B. Remove insulation on insulated pipe for a distance of six inches (150 mm) on either side of the fire rated assembly prior to applying the firestopping materials unless the firestopping materials are tested and approved for use on insulated pipes.
C. Install backing materials to arrest liquid material leakage.
3.03 INSTALLATION
A. Do not begin work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.
B. Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.
C. Install smoke stopping seals in smoke partitions.
3.04 FIELD QUALITY CONTROL
A. Owner’s Fire Marshal will examine completed firestopping to determine, in general, if it is being installed in compliance with requirements.
B. Do not proceed to enclose firestopping with other construction until reports of Owner Fire Marshal’s examinations are issued.
C. Where deficiencies are found, repair or replace firestopping so that it complies with requirements.
3.05 CLEANING
A. Remove materials, litter, and debris.
B. Clean up spills of liquid type materials.
END OF SECTION 07 84 00
SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 1 of 5
PART 1 GENERAL
1.01 SUMMARY
A. Provide joint sealants, for interior and exterior joints not specified elsewhere, with backing rods and accessories as required for complete installation. Joint sealers include sealants and caulking as indicated.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Product Data: Furnish manufacturer's descriptive literature.
C. Samples: Furnish samples of each type of exposed joint sealer in required colors.
D. Certifications:
1. Furnish manufacturer's certification joint sealers comply with Contract Documents and are suitable for Project applications.
2. Furnish certification indicating installers are trained in proper use of specified products, qualified, and familiar with proper installation techniques.
1.04 QUALITY ASSURANCE
A. Performance Requirements:
1. Select materials for compatibility with joint surfaces and indicated exposures.
2. Where not indicated, select modulus of elasticity and hardness or grade recommended by manufacturer for each application indicated.
3. Comply with applicable limitations on volatile organic compound (VOC) emissions.
B. Installer Qualifications: Firm with minimum five years successful experience on projects of similar type and size, using specified products.
1. Installers shall be familiar with proper application procedures to ensure maximum joint sealer expansion and contraction capabilities.
SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 2 of 5
1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration period for use, cure time, and mixing instructions.
1.06 SITE CONDITIONS
A. Do not proceed with installation of joint sealers under unfavorable weather conditions.
B. Install elastomeric sealants when temperature is in lower third of temperature range recommended by manufacturer.
1.07 WARRANTY
A. Special Warranty: Repair or replace joint sealers which fail to perform as intended, because of leaking, crumbling, hardening, shrinkage, bleeding, sagging, staining and loss of adhesion.
PART 2 PRODUCTS
2.01 MATERIALS
A. Elastomeric Sealants:
1. Single-Component Low Modulus Silicone Sealant: ASTM C920 Type S, Class 25, Grade NS; minimum 50% expansion and compaction capability. a. Provide at exterior locations not exposed to traffic. b. Manufacturers:
1) General Electric Co./Silpruf, Silglaz or GESIL.
2) Dow Corning Corp./790 or 795.
3) Pecora Corp./864 Architectural Silicone.
4) Tremco/Spectrum 3.
2. Multi-Component Polyurethane Sealant: ASTM C920, Type M, Grade P, Class 25, self-leveling; minimum 25% expansion and compaction capability. a. Provide following at traffic bearing locations.
b. Manufacturers:
1) Pecora Corp./NR-200 Urexpan.
2) Tremco/Vulkem 245.
3) Sonneborn Division of ChemRex /SL 2
SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 3 of 5
3. Mildew-Resistant Silicone Rubber Sealant: ASTM C920, Type S, Grade NS, Class 25, compounded with fungicide, specifically for mildew resistance and recommended for interior joints in wet areas.
a. Provide at interior joints in wet areas.
b. Manufacturers:
1) General Electric Co./SCS 1702 Sanitary Sealant.
2) Dow Corning Corp./786 Bathtub Caulk.
3) Pecora Corp./863 #345 White.
4) Tremco/Tremsil 200.
B. Non-Elastomeric Sealants:
1. Acrylic-Emulsion Sealant: ASTM C834 acrylic or latex-rubber-modified acrylic sealant, permanently flexible, non-staining and non-bleeding; recommended for general interior exposure; compatible with paints specified in Section 09 90 00. a. Provide at general interior applications.
b. Manufacturers:
1) Pecora Corp./AC-20.
2) Sonneborn Division of ChemRex/Sonolac.
3) Tremco/Ultrem 1500
C. Miscellaneous Materials:
1. Primers/Sealers: Non-staining types recommended by joint sealer manufacturer for joint surfaces to be primed or sealed.
2. Joint Cleaners: Non-corrosive types recommended by joint sealer manufacturer; compatible with joint forming materials.
3. Bond Breaker Tape: Polyethylene tape as recommended by joint sealer manufacturer where bond to substrate or joint filler must be avoided for proper performance of joint sealer.
4. Sealant Backer Rod: Compressible polyethylene foam rod or other flexible, permanent, durable non-absorptive material as recommended by joint sealer manufacturer for compatibility with joint sealer.
a. Oversize backer rod minimum 30% to 50% of joint opening.
D. Colors: Provide colors indicated or as selected by Architect from manufacturer's full range of colors.
PART 3 EXECUTION
SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 4 of 5
3.01 PREPARATION
A. Prepare joint surfaces in accordance with ASTM C1193 and as recommended by joint sealer manufacturer.
B. Clean joint surfaces immediately before installation of joint sealer; remove dirt, insecure materials, moisture and other substances which could interfere with bond of joint sealer.
C. Prime or seal joint surfaces where recommended by joint sealer manufacturer; do not allow primer/sealer to spill or migrate onto adjoining surfaces.
D. Ensure protective coatings on surfaces in contact with joint sealers have been completely stripped.
3.02 INSTALLATION
A. Comply with manufacturer's printed instructions and ASTM C1193, except where more stringent requirements are shown or specified.
B. Set sealant backer rods at proper depth or position in joint to coordinate with other work, including installation of bond breakers and sealant; do not leave voids or gaps between ends of backer rods.
1. Do not stretch, twist, puncture or tear backer rods.
C. Install bond breaker tape where required by manufacturer's recommendations to ensure joint sealers will perform properly.
D. Size materials to achieve required width/depth ratios.
E. Employ installation techniques that will ensure joint sealers are deposited in uniform, continuous ribbons without gaps or air pockets, with complete "wetting" of bond surfaces equally on opposite sides.
F. Joint Configuration: Fill sealant joint to a slightly concave surface, slightly below adjoining surfaces, unless otherwise indicated.
G. Where horizontal joints are between a horizontal surface and vertical surface, fill joint to form a slight cove, so that joint will not trap moisture or dirt.
H. Install joint sealers to depths recommended by joint sealer manufacturer but within the following general limitations, measured at center (thin) section of bead.
1. Horizontal Joints: 75% width with minimum depth of 3/8".
2. Elastomeric Joints: 50% width with minimum depth of 1/4".
3. Non-Elastomeric Joints: 75% to 125% of joint width.
I. Spillage: Do not allow sealants or compounds to overflow or spill onto adjoining surfaces, or to migrate into voids of adjoining surfaces.
1. Clean adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage.
SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 5 of 5
J. Cure joint sealers in compliance with manufacturer's instructions and recommendations to obtain high early bond strength, internal cohesive strength and surface durability.
K. Maintain finished joints free of embedded matter, ridges and sags.
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK Page 544 of 1257
SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 1 of 4
PART 1 GENERAL
1.01 SUMMARY
A. Interior non-rated and fire-rated welded steel doors and frames.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 REFERENCES
A. Americans with Disabilities Act (ADA) - Accessibility Guidelines for Buildings and Facilities.
B. DHI - Door Hardware Institute: The Installation of Commercial Steel Doors and Steel Frames, Insulated Steel Doors in Wood Frames and Builder's Hardware.
C. ANSI/SDI 100 - Standard Steel Door and Frames.
D. ASTM A366 - Steel, Carbon, Cold-Rolled Sheet, Commercial Quality.
E. ASTM A525 - Steel Sheet, Zinc Coated (Galvanized) by the Hot Dip Process.
F. ASTM C976 - Thermal Performance of Building Assemblies by Means of a Calibrated Hot Box.
G. ASTM E90 - Measurement of Airborne-Sound Transmission Loss of Building Partitions.
H. ASTM E413 - Classification for Rating Sound Insulation.
I. SFM Standard 12-7-4
1.04 SUBMITTALS
A. Section 01 33 00 - Submittals: Submittal Procedures.
B. Shop Drawings: Indicate door and frame configuration, anchor types and spacings, location of cut-outs for hardware, glazing and louvers, reinforcement, and finish.
C. Product Data: Fire rated doors and frames, showing conformance with CBC and Underwriters Laboratory, Inc., or Warnock Hersey or Factory Mutual fire rating requirements.
D. Instructions: Submit manufacturer's installation instructions.
E. Manufacturer's Certification: Certify that Products meet or exceed specified requirements.
SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 2 of 4
1.05 QUALITY ASSURANCE
A. Conform to the requirements of ANSI/SDI-100 and Americans with Disabilities Act (ADA) - Accessibility Guidelines for Buildings and Facilities.
B. Verify that field measurements are as indicated on approved shop drawings.
C. Performance Standards:
1. Fire-Rated Assemblies: SFM Standard 12-7-4, and acceptable testing agency listing.
2. Sound-Rated Assemblies at Mechanical Rooms: ASTM E1408 and ASTM E413.
1.06 REGULATORY REQUIREMENTS
A. Fire rated doors and frames construction to conform to SFM Standard 12-7-4.
B. Installed door and frame assemblies to conform to CBC for fire rated class indicated on schedule.
1.07 DELIVERY, STORAGE, AND PROTECTION
A. Prior to shipment label each door and frame to show location, size, door swing and other pertinent information.
B. Accept doors and frames on site in manufacturer's packaging. Inspect for damage.
1.08 WARRANTY
A. Provide five-year warranty against defects in manufacture and materials.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Ceco Door Products;
B. Curries, “747 Series”;
C. Republic, “DS Series”;
D. Steelcraft, “Series B”;
E. Or approved equal.
2.02 DOORS AND FRAMES
A. Interior Flush Doors: SD1-100, Heavy Duty, Grade 2, Model 1.
B. Interior Frames: Welded 16 gage thick material, core thickness to suit model and grade of doors. Knockdown frames not permitted.
C. Inserts, Bolts, and Fasteners: Manufacturer's standard units for the required application; hot-dip-galvanize items to be embedded in or in contact with concrete foundation wall or slab-on-grade.
SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 3 of 4
2.03 DOOR CORES
A. Core: Vertical steel stiffeners at flush doors.
2.04 ACCESSORIES
A. Rubber Silencers: Resilient rubber.
B. Glass: As specified in Section 08 80 00 - Glazing.
C. Glazing Stops: Rolled steel channel shape, butted corners, prepared for countersink style tamperproof screws.
2.05 PROTECTIVE COATINGS
A. Primer: Manufacturer's standard red-oxide/zinc-chromate primer for interior surfaces.
B. Paint galvanized surfaces with zinc-dust/zinc-oxide primer.
2.06 FABRICATION
A. Fabricate frames and doors in accordance with requirements of the Steel Door Institute specification SDI-100, and as indicated on drawings. Provide welded frames at interior doors.
B. Fabricate doors and frames with hardware reinforcement plates welded in place. Drill and tap for surface-applied finish hardware. Provide mortar guard boxes where indicated.
C. Accurately form and cut mitered corners of welded type frames. Weld on inside surfaces.
Sand-welded joints to a smooth uniform finish. Use welded frames at all interior locations. Use of splice plates at corners is not acceptable.
D. Fabricate frames of pairs of doors wider than 3'-6" of 12 gage steel.
E. Reinforce frames wider than 48 inches with roll formed steel channels fitted tightly into frame head, flush with top.
F. Prepare frame for silencers. Provide three single silencers for single doors on strike side, and two single silencers on frame head at double doors.
G. Provide jamb and floor anchors in accordance with SDI-100.
H. Attach channel or angle spreaders at bottom of welded type doorframes to ensure proper alignment while shipping.
I. Fill surface depressions with metallic paste filler and sand to a smooth uniform finish.
J. Provide prime coat on doors and frames, including backs of frames.
K. Touch up areas with zinc rich paint where galvanized coating has been removed due to welding, sanding or handling.
L. Attach fire rated label to each frame and door unit scheduled to be labeled.
2.07 FINISH
SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 4 of 4
A. Shop primer, compatible with finish paint specified in Section 09 90 00.
PART 3 EXECUTION
3.01 EXAMINATION
A. Section 01 31 00 - Project Management and Coordination.
B. Verify that opening sizes and tolerances are acceptable.
3.02 INSTALLATION
A. Install frames in accordance with SDI-100.
B. Install adjustable frames in accordance with manufacturer’s instructions.
C. Install doors in accordance with DHI.
D. Coordinate installation of glass and glazing.
E. Install door louvers plumb and level.
F. Maximum Diagonal Distortion: 1/16 inch measured with straight edge, corner to corner.
3.03 ADJUSTING
A. Adjust doors for smooth operation and balanced door movement.
END OF SECTION
SECTION 08 14 00 WOOD DOORS
WOOD DOORS 08 14 00 - 1 of 4
PART 1 GENERAL
1.01 SUMMARY
A. This section specifies the installation of wood doors.
B. Factory finished wood doors.
1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:
1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.
2. All Specification Sections listed in the Table of Contents.
1.03 REFERENCES
A. ANSI/NWMA I. S. - Industry Standard for Wood Flush Doors.
B. WIC - Woodwork Institute of California, Manual of Millwork Standards of the Woodwork Industry, latest edition.
1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.
B. Shop Drawings: Illustrate door opening criteria, elevations, sizes, types, swings, undercuts required, identify cutouts for glazing and louvers, blocking for hardware attachment.
C. Product Data: Indicate door core materials and construction, veneer species, type and characteristics.
D. Manufacturer's Installation Instructions: Indicate special installation instructions.
E. Labeled fire rated doors showing conformance with NFPA 80.
1.05 QUALITY ASSURANCE
A. Perform work in accordance with WIC, Section 20, Custom Grade.
B. Manufacturer: Company specializing in manufacturing the products specified in this section with minimum three (3) years documented experience.
C. Millwork Shop: Company specializing in custom cabinetry and doors specified in this section with minimum three years documented experience.