SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

1.07 QUALITY ASSURANCE
A. Conform all work to the appropriate portion(s) of the California Code of Regulations, Title 24 and Caltrans Standard Specifications, Sections 17 and 19.

B. Percentage of compaction specified shall be the minimum acceptable. The percentage represents the ratio of the dry density of the compacted material to the maximum dry density of the material as determined by the procedure set forth in ASTM D 1557.

C. Upon completion of the construction work, certify that all compacted fills and foundations are in place at the correct locations, and have been constructed in accordance with sound construction practice. In addition, certify that the materials used are of the types, quality and quantity required by these Technical Specifications. The Contractor shall be responsible for the stability of all fills and backfills constructed by his forces.

D. Finish soil grade tolerance at completion of grading:
(1) Building and paved areas: +0.05
(2) Other areas: ±0.10 feet.

E. The project geotechnical engineer shall be notified of the construction schedule at least one week prior to the beginning of major site construction, and notified at least 48 hours (working days) before being required to perform field observation and testing.

1.08 PROJECT CONDITIONS
A. Promptly notify the Owner of surface or subsurface conditions differing from those disclosed in the construction documents. First notify the Owner verbally to permit verification and extent of condition and then in writing. No claim for conditions differing from those anticipated in the Contract Documents will be allowed unless the Contractor has notified the Owner in writing of differing conditions prior to the Contractor starting work on affected items.

B. Protect open excavations, trenches, and the like with fences, covers and railings to maintain safe pedestrian and vehicular traffic passage.

C. Prevent erosion of freshly graded areas during construction and until such time as permanent drainage and erosion control measures have been installed.

D. Temporarily stockpile fill material in an orderly and safe manner and in a location approved by the Owner.

E. Provide dust and noise control in conformance with Division 1 General Requirements for Cleaning and Waste Management.

F. Environmental Requirements: When unfavorable weather conditions necessitate interrupting earthwork operation, areas shall be prepared by compaction of surface and grading to avoid collection of water. Provide adequate temporary drainage to prevent erosion. After interruption, compaction specified in last layer shall be re-established before resuming work.

EXCAVATION AND FILL
312300-3

Page 2248 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
PART 2 PRODUCTS

2.01 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from on -site excavations.

B. On -Site Structural Fill and Structural Backfill: Soil or soil -rock mixture from on site excavations, free from organic matter or other deleterious substances. On -site structural fill and backfill shall not contain rocks or rock fragments over 4 inches in greatest dimension and not more than 15 percent shall be over 2-1/2 inches in greatest dimension and with an organic content less than 3.0 percent by weight.

C. Imported Structural Fill and Structural Backfill: Conform to the requirements of on -site structural fill. Material shall also be a non -expansive and predominantly granular soil or soil -rock mixture with plasticity index of 15 or less in accordance with ASTM D 4318 and an R -Value of 25 or greater.

2.02 GRAVEL BACKFILL
A. 3/4" crushed rock.

PART 3 EXECUTION

3.01 GENERAL
A. Conform to Section 19, Earthwork, Caltrans Standard Specifications as modified by the Contract Documents.

B. Placement and compaction of material by flooding, ponding, or jetting will not be permitted.

C. The use of explosives will not be permitted.

3.02 CONTROL OF WATER AND DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding the site and surrounding area. Provide dewatering equipment necessary to drain and keep excavations and site free from water.

B. Dewater during backfilling operation so that groundwater is maintained a least one foot below level of compaction effort.

C. Obtain the Owner's approval for proposed control of water and dewatering methods.

D. Protect subgrades from softening, undermining, washout and damage by rain or water accumulation.

E. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations.

F. Maintain dewatering system in place until dewatering is no longer required.

3.03 WET WEATHER CONDITIONS

EXCAVATION AND FILL
312300-4

Page 2249 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. Do not prepare subgrade, place or compact soil materials if above optimum moisture content.

3.04 BRACING AND SHORING
A. Conform to California and Federal OSHA requirements.

B. Place and maintain such bracing and shoring as may be required to support the sides of the excavations for the proper protection of workmen; to facilitate the work; to prevent damage to the facility being constructed; and to prevent damage to adjacent structures or facilities. Remove all bracing and shoring upon completion of the work.

C. Be solely responsible for all bracing and shoring and, if requested by the Owner, submit details and calculations to the Owner. The Owner may forward the submittal to the Consulting Engineer and/or the California Division of Industrial Safety for their review. The Contractor's submittal shall include the basic design, assumed soils conditions and estimation of forces to be resisted, together with plans and specifications of the materials and methods to be used, and shall be prepared by a civil engineer or structural engineer registered in California. No excavations related to the proposed facility shall precede a response to the submittal by the Owner.

D. Be solely responsible for installing and extracting the sheathing in a manner which will not disturb the position or operation of the facility being constructed or adjacent utilities and facilities.

3.05 EXCAVATION
A. Excavate earth and rock to lines and grades shown on drawings and to the neat dimensions indicated on the Plans, required herein or as required to satisfactorily compact backfill.

B. Remove and dispose of large rocks, pieces of concrete and other obstructions encountered during excavation.

C. Where forming is required, excavate only as much material as necessary to permit placing and removing forms.

D. Provide supports, shoring and sheet piles required to support the sides of excavations or for protection of adjacent existing improvements.

3.06 REMOVAL OF EXISTING FILLS AND UNSUITABLE MATERIAL
A. Over -excavate areas of existing fills and other unsuitable material encountered during mass grading.

B. Compensation for increased removal widths and depths that are not required will not be considered, except when such increase is necessary for protection of life and property as determined by and approved by the Owner.

3.07 GRADING
A. Uniformly grade the Project to the elevations shown on plans.

EXCAVATION AND FILL
312300-5

Page 2250 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Finish ditches, gutters and swales to the sections, lines and grades indicated and to permit proper surface drainage.

C. Round tops and bottoms of slopes as indicated or to blend with existing contours.

3.08 SUBGRADE PREPARATION
A. Install underground utilities and service connections prior to final preparation of subgrade and placement of base materials for final surface facilities. Extend services so that final surface facilities are not disturbed when service connections are made.

B. Prepare subgrades under paved areas, curbs, gutters, walks, structures, other surface facilities and areas to receive structural fill.

C. Prepare subgrades for paved areas, curbs and gutters by plowing or scarifying surface at least 6 inches below final subgrade elevations and 5 -feet beyond edge of pavement. Uniformly moisture condition to obtain optimum moisture contents.

Break clods and condition surface by harrowing or dry rolling. Remove boulders, hard ribs and solid rock. Prepare earth uniform for full depth and width of subgrade.

D. Protect utilities from damage during compaction of subgrades and until placement of final pavements or other surface facilities.

3.09 PLACEMENT OF STRUCTURAL FILL
A. Place structural fill on prepared subgrade.

B. Spread structural fill material in uniform lifts not more than 8 -inches in un- compacted thickness and compact.

C. Place structural fill material to suitable elevations above grade to provide for anticipated settlement and shrinkage.

D. Overbuild fill slopes to obtain required compaction. Remove excess material to lines and grades indicated.

E. Do not drop fill on structures. Do not backfill around, against or upon concrete or masonry structures until structure has attained sufficient strength to withstand loads imposed and the horizontal structural system had been installed.

F. Backfill in uniform lifts not exceeding 8 inches in uncompacted thickness. Each lift should be brought to a uniform moisture content of at lease 1 percent above optimum prior to compacting by either spraying the soil with water of it is too dry or aerating the material if it is too wet.

3.10 COMPACTION AND TESTING
A. Do not compact by ponding, flooding or jetting.

B. Compact soils at optimum water content. Aerate material if it is too wet. Add water to material if it is too dry. Thoroughly mix lifts before compaction to ensure uniform moisture distribution.

EXCAVATION AND FILL
312300-6

Page 2251 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Perform compaction using rollers, pneumatic or vibratory compactors.

D. Compaction requirements:
(1) Compact structural fills less than 5 -feet thick to 90 percent compaction. (2) Compact structural fill 5 -feet thick or greater to 95 percent compaction. (3) Compact the upper 6 inches of subgrade soils beneath pavements, curbs and gutters to 95 percent compaction. Extend compaction 5 -feet beyond pavement.
(4) Compact the upper 6 -inches of subgrade soils to the following percentage of compaction: 95 percent under walks and pavements; 93 percent for foundations; and 90 percent for areas to receive structural fill."

3.11 DISPOSAL
A. Lawfully dispose of all unsuitable and excess or surplus material off -site at no cost
END OF SECTION 31 23 00

EXCAVATION AND FILL
312300-7

Page 2252 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
DOCUMENT 31 23 00

TRENCHING AND BACKFILLING
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Excavation, bedding, and backfill for underground storm drain, sanitary sewer, and water piping and associated structures.

1.02 SECTION EXCLUDES
A. Drainage fill material and placement around subdrains.

B. Trenching and backfill for other utilities such as underground HVAC piping, electrical conduit, telephone conduit, gas piping, cable TV conduit, etc.

1.03 RELATED SECTIONS
A. Section 31 23 00 — Excavation and Fill.

B. Section 33 40 00 - Storm Drainage Utilities.

1.04 RELATED DOCUMENTS
A. ASTM:
(1) C 33, Specification for Concrete Aggregates.
(2) C 150, Specification for Portland Cement.
(3) C 260, Specification for Air -Entraining Admixtures for Concrete. (4) C 618, Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete. (5) D 1557, Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort.
(6) D 2321, Practice for Underground Installation of Flexible Thermoplastic Sewer Pipe.
(7) D 2487, Classification of Soils for Engineering Purposes. (8) D 3740, Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.
(9) E 329, Specification for Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction. (10) E 548, Guide for General Criteria Used for Evaluating Laboratory Competence.

TRENCHING AND BACKFILLING 02 40 00 - 1

Page 2253 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. California Code of Regulation Title 24, Part 2, California Building Code:
(1) Chapter 11B — Accessibility to Public Buildings.
(2) Chapter 33 — Site Work, Demolition and Construction.

C. Caltrans Standard Specifications:
(1) Section 19, Earthwork.
(2) Section 26, Aggregate Bases.
(3) Section 68, Subsurface Drains.
(4) Section 88, Engineering Fabrics.

D. CAL/OSHA, Title 8.

1.05 DEFINITIONS
A. AC: Asphalt Concrete.

B. ASTM: American Society for Testing and Materials.

C. Bedding: Material from bottom of trench to bottom of pipe.

D. CDF: Controlled Density Fill.

E. DIP: Ductile Iron Pipe.

F. Initial Backfill: Material from bottom of pipe to 12 -inches above top of pipe.

G. PCC: Portland Cement Concrete.

H. RCP: Reinforced Concrete Pipe.

Springline of Pipe: Imaginary line on surface of pipe at a vertical distance of 1/2 the outside diameter measured from the top or bottom of the pipe.

J. Subsequent Backfill: Material from 12 -inches above top of pipe to subgrade of surface material or subgrade of surface facility or to finish grade.

K. Trench Excavation: Removal of material encountered above subgrade elevations and within horizontal trench dimensions.
(1) Authorized Trench Over -Excavation: Excavation below trench subgrade elevations or beyond indicated horizontal trench dimensions as shown on plans.
(2) Unauthorized Trench Over -Excavation: Excavation below trench subgrade elevations or beyond indicated horizontal trench dimensions.

Unauthorized excavation shall be without additional compensation.

L. Utility Structures:

TRENCHING AND BACKFILLING 02 40 00 - 2

Page 2254 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Storm drainage manholes, catch basins, drop inlets, curb inlets, vaults, etc.
(2) Sanitary sewer manholes, vaults, etc.
(3) Water vaults, etc.

1.06 SUBMITTALS
A. Follow submittal procedures outlined in Section 01 33 00 - Submittal Procedures.

B. Product Data:
(1) Grading and quality characteristics showing compliance with requirements for the Work.
(2) Certify that material meets requirements of the Project.

C. Samples:
(1) If required, provide 40 -pound samples of all imported trench bedding and backfill material sealed in airtight containers, tagged with source locations and suppliers of each proposed material.
(2) Provide materials from same source throughout work. Change of source requires approval of the Owner.

1.07 QUALITY ASSURANCE
A. Conform all work to the appropriate portion(s) of the Caltrans Standard Specifications, Section 19.

B. Percentage of compaction specified shall be the minimum acceptable. The percentage represents the ratio of the dry density of the compacted material to the maximum dry density of the material as determined by the procedure set forth in ASTM D 1557.

C. Conform work to the requirements of the California Building Code. (1) Section 1806A.11 — Pipe and Trenches.

1.08 PROJECT CONDITIONS
A. Promptly notify the Owner of surface or subsurface conditions differing from those disclosed in the construction documents. First notify the Owner verbally to permit verification and extent of condition and then in writing. No claim for conditions differing from those anticipated in the Contract Documents will be allowed unless Contractor has notified the Owner in writing of differing conditions prior to contractor starting work on affected items.

B. Protect open, trenches, and utility structure excavations with fences, covers and railings to maintain safe pedestrian and vehicular traffic passage.

TRENCHING AND BACKFILLING 02 40 00 - 3

Page 2255 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Stockpile on -site and imported backfill material temporarily in an orderly and safe manner.

D. Provide dust and noise control in conformance with Section 02000, Supplemental General Requirements for Civil Improvements. Also see Division 1 General Requirements for Cleaning and Waste Management.

PART 2 PRODUCTS

2.01 PIPE BEDDING AND INITIAL BACKFILL
A. ASTM D 2321, Class IA, IB or II.
(1) Clean and free of clay, silt or organic matter.

B. Permeable Material: Conform to Section 68-1.025 of Caltrans Standard Specifications, Class 2 permeable.

C. Class 2 Aggregate Base: Conform to Section 26 of Caltrans Standard Specifications, %-inch maximum. Material shall also be non -expansive and predominantly granular soil or soil -rock mixture "(percent of passing #200: 50 maximum, 5 minimum)" with plasticity index of 15 or less.

D. Sand: Conform to Section 19-3.025B of Caltrans Standard Specifications.

2.02 SUBSEQUENT BACKFILL
A. Conform to on -site or imported structural backfill in Section 31 23 00 — Excavation and Fill.

2.03 CONTROLLED DENSITY FILL (CDF) (IN TRENCHES)
A. Provide non-structural CDF, from bottom of trench to finish subgrade of subbase or base material, that can be excavated by hand and produce unconfined compressive 28 -day strengths from 50 -psi to a maximum of 150 -psi. Provide aggregate no larger than 3/8 -inch top size. The 3/8 -inch aggregate shall not comprise more than 30% of the total aggregate content.

B. Cement: Conform to the standards as set forth in ASTM C-150, Type II Cement.

C. Fly Ash: Conform to the standards as set forth in ASTM C-618, for Class F pozzolan. Do not inhibit the entrainment of air with the fly ash.

D. Air Entraining Agent: Conform to the standards as set forth in ASTM C-260.

E. Aggregates need not meet the standards as set forth in ASTM C-33. Any aggregate, producing performances characteristics described herein will be accepted for consideration. The amount of material passing a #200 sieve shall not exceed 12% and no plastic fines shall be present.

F. Provide CDF that is a mixture of cement, Class F pozzolan, aggregate, air entraining agent and water. CDF shall be batched by a ready mixed concrete plant and delivered to the job site by means of transit mixing trucks.

TRENCHING AND BACKFILLING 02 40 00 - 4

Page 2256 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
G. The Contractor shall determine the actual mix proportions of the controlled density fill to meet job site conditions, minimum and maximum strengths, and unit weight. Entrained air content shall be a minimum of 4.0%. The actual entrained air content shall be established for each job with the materials and aggregates to be used to meet the placing and unit weight requirements. Entrained air content may be as high as 20% for fluidity requirements.

2.04 CONCRETE STRUCTURE BEDDING AND BACKFILL
A. Precast Structures: Same materials to the same heights as specified for pipe bedding and backfill.

B. Poured -in -Place Structures:
(1) Bedding: In general, bedding is not required, pour bases against undisturbed native earth in cut areas and against engineered fill compacted to 90% relative compaction in embankment areas. (2) Side Backfill: On -site or imported structural fill meeting the requirements given in Section 31 23 00 — Excavation and Fill.

2.05 FILTER FABRIC
A. Filter Fabric:
(1) Filter Fabric: Section 88-1.03 of Caltrans Standard Specifications. (2) Mirafi 140N (Mirafi Inc., Charlotte, NC) (Tel. 800-438-1855) or equal.

PART 3 EXECUTION

3.01 TRENCHING AND EXCAVATION
A. Existing PCC or AC Areas: Cut PCC or AC to full depth at a minimum distance of 12 -inches beyond the edge of the trench.

B. Excavate by hand or machine. For gravity systems begin excavation at the outlet end and proceed upstream. Excavate sides of the trench parallel and equal distant from the centerline of the pipe. Hand trim excavation. Remove loose matter.

C. Excavation Depth for Bedding: Minimum of 4 -inches below bottom, except that bedding is not required for nominal pipe diameters of 2 -inches or less.

D. Excavation Width at Springline of Pipe:
(1) Up to a nominal pipe diameter of 24 -inches: Minimum of twice the outside pipe diameter.
(2) Nominal pipe diameter of 30 -inches through 36 -inches: Minimum of the outside pipe diameter plus 2 -feet.
(3) Nominal pipe diameter of 42 -inches through 60 -inches: Minimum of the outside pipe diameter plus 3 -feet.

TRENCHING AND BACKFILLING 02 40 00 - 5

Page 2257 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
E. Over -Excavations: Backfill trenches that have been excavated below bedding design subgrade, with approved bedding material.

F. Comply with the Owner's limitations on the amount of trench that is opened or partially opened at any one time. Do not leave trenches open overnight without the approval of the Owner.

G. Where forming is required, excavate only as much material as necessary to permit placing and removal of forms.

H. Grade bottom of trench to provide uniform thickness of bedding material and to provide uniform bearing and support for pipe along entire length. Remove stones to avoid point bearing.

3.02 CONTROL OF WATER AND DEWATERING
A. Be solely responsible for dewatering trenches and excavations and subsequent control of ground and surface water. Provide and maintain such pumps or other equipment as may be necessary to control ground water.

B. Dewater during backfilling operation so that groundwater is maintained a least one foot below level of compaction effort.

C. Reroute surface water runoff away from open trenches and excavations. Do not allow water to accumulate in trenches and excavations.

D. Maintain dewatering system in place until dewatering is no longer required.

3.03 BRACING AND SHORING
A. Conform to California and Federal OSHA requirements.

B. Place and maintain such bracing and shoring as may be required to support the sides of the excavations for the proper protection of workmen; to facilitate the work; to prevent damage to the pipes and appurtenances being constructed; and to prevent damage to adjacent structures or facilities. Remove all bracing and shoring upon completion of the work.

C. Be solely responsible for all bracing and shoring and, if requested by the Owner, submit details and calculations to the Owner. The Owner may forward the submittal to the Consulting Engineer and/or the California Division of Industrial Safety for their review. The Contractor's submittal shall include the basic design, assumed soils conditions and estimation of forces to be resisted, together with plans and specifications of the materials and methods to be used, and shall be prepared by a civil engineer or structural engineer registered in California. No excavations in trench section or around structures shall precede a response to the submittal by the Owner.

D. Be solely responsible for installing and extracting the sheathing in a manner which will not disturb the line, grade, or backfill compaction or operation of the utility being installed or adjacent utilities and facilities.

3.04 PIPE BEDDING
TRENCHING AND BACKFILLING 02 40 00 - 6

Page 2258 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. Accurately shape bedding material to the line and grade called for on the Plans.

Carefully place and compact bedding material to the elevation of the bottom of the pipe in layers not exceeding 8 -inches in loose thickness. Compact bedding material at optimum water content to 95% relative compaction unless specified otherwise on the. Compact by pneumatic tampers or other mechanical means.

Jetting or ponding of bedding material will not be permitted.

3.05 BACKFILLING
A. Bring initial backfill up simultaneously on both sides of the pipe, so as to prevent any displacement of the pipe from its true alignment. Carefully place and compact initial backfill material to an elevation of 12 -inches above the top of the pipe in layers not exceeding 8 -inches in loose thickness. Compact bedding material at optimum water content to 90% relative compaction unless specified otherwise on the. Compact by pneumatic tampers or other mechanical means.

Jetting or ponding of initial backfill material will not be permitted.

B. Bring subsequent backfill to subgrade or finish grade as indicated. Carefully place and compact subsequent backfill material to the proper elevation in layers not exceeding 8 -inches in loose thickness. Compact bedding material at optimum water content to 90% relative compaction, unless specified otherwise on the Plans. Compact by pneumatic tampers or other mechanical means. Jetting or ponding of subsequent backfill material will not be permitted.

C. Do not use compaction equipment or methods that produce horizontal or vertical earth pressures that may cause excessive pipe displacement or damage the pipe.

3.06 CLEANUP
A. Upon completion of utility earthwork all lines, manholes catch basins, inlets, water meter boxes and other structures shall be thoroughly cleaned of dirt, rubbish, debris and obstructions of any kind to the satisfaction of the Owner.

B. See Section 01 74 00 — Refer to Division 1 General Requirements for Cleaning and Waste Management for further cleanup requirements.

END OF SECTION 02 40 00
TRENCHING AND BACKFILLING 02 40 00 - 7

Page 2259 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 321444

DECOMPOSED GRANITE
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Standard and Special Provisions and Technical Specification Sections, apply to this Section.

1. Section 32 13 13: "Concrete for Exterior Improvements" for base courses

2. Section 32 23 00: "Excavation and Fill"

1.2 SUMMARY
A. This Section includes all services, labor, materials, transportation, and equipment necessary to perform the Work indicated on the Plans and Specifications, as required to properly construct an ADA accessible, decomposed granite paving on a prepared subgrade, and includes the following:

1. Decomposed Granite Pathways

1.3 REFERENCES
A. ASTM C136 - Sieve Analysis of Fine and Coarse Aggregates.

1.4 QUALITY ASSURANCE
A. Decomposed granite paving shall meet U.S. Department of Transportation/Federal Highway Administration Standard rating for surface firmness of 0.3 inches or less and surface stability of 0.5 inches or less as measured by a rotational penetrometer.

1.5 SUBMITTALS
A. One-half cubic foot sample of each material for approval by Landscape Architect. prior to delivery of material to site.

B. Product date for each type of product indicated
C. Mock-up. 4'x4'x2-inches deep mock-up with 2x4 wood edging of decomposed granite paving. Mock-up shall be for approval by Landscape Architect prior to pavement of decomposed granite. Approved sample will remain on site for comparison with proposed work.

DECOMPOSED GRANITE 321444 - 1

Page 2260 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
PART 2 - PRODUCTS

2.1 MATERIALS
A. Gold Path Fines 1/4 -inch to dust granite; free of shale, clay, friable materials and debris; Material must be from a quarry in California. Material must meet the sieve test below.

Sieve Size
Sieve No.
% Passing

9.5 mm
3/8 inch
100.0%

4.76 mm
#4

93.9%

2.368 mm
#8

66.5%

1.190 mm
#16

41.0%

0.595 mm
#30

23.7%

0.297 mm
#50

11.8%

0.149 mm
#100

4.4%

0.074 mm
#200

1.5%
B. Normal -Weight Aggregates: ASTM C 33, Class 4M coarse aggregate, uniformly graded. Provide aggregates from a single source.

C. Water: ASTM C 94/C 94M.

D. Rotational Penetrometer: available from Beneficial Designs, Inc., Minden Nevada, (775)783-8822.

PART 3 - EXECUTION

3.1 INSPECTION
A. Verify 90 percent relative compacted subgrade is dry and ready to receive work of this Section.

B. Verify gradients and elevations of base are correct.

3.2 DECOMPOSED GRANITE PLACEMENT
A. Spread material over prepared base to a total compacted thickness as shown on the Plans.

B. Scarify surface prior to placement of layers to provide a bond between the layers.

C. Place decomposed granite in two layers of equal depth and compact by poser rollers to 90 percent optimum moisture content in accordance with ASTM D1557.

DECOMPOSED GRANITE 321444 - 2

Page 2261 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
D. Level surfaces to elevation and gradients as indicated.

3.3 TESTING AND PROTECTION
A. Test installed decomposed granite paving with a rotational penetrometer to meet required USDOT/FWHA standards. Installations failing test shall be replaced and reinstalled until satisfying standard.

B. Protect installed site furniture, if required, during the construction period to prevent damage and wear.

END OF SECTION 32 14 44
DECOMPOSED GRANITE 321444 - 3

Page 2262 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
DOCUMENT 32 17 26

TACTILE WARNING SURFACING
PART 1 GENERAL

1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY
A. Section Includes:
(1) Cast -in -place detectable warning tiles.
(2) Surface -applied detectable warning tiles.
(3) Detectable warning mats.
(4) Detectable warning unit pavers.

B. Related Requirements:
(1) Section 321313 "Concrete Paving" for concrete walkways serving as substrates for tactile warning surfacing.
(2) Section 321400 "Unit Paving" for unit paving installations incorporating detectable warning unit pavers specified in this Section.

1.03 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Sustainable Design Submittals:

C. Samples for Initial Selection: For each type of exposed finish requiring color selection.

D. Samples for Verification: For each type of tactile warning surface, in manufacturer's standard sizes unless otherwise indicated, showing edge condition, truncated -dome pattern, texture, color, and cross section; with fasteners and anchors.

1.04 CLOSEOUT SUBMITTALS
A. Maintenance Data: For tactile warning surfacing, to include in maintenance manuals.

TACTILE WARNING SURFACING 32 17 26 -1

Page 2263 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

1.05 QUALITY ASSURANCE
A. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for materials and execution.
(1) Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.06 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at [Project site] .

1.07 PROJECT CONDITIONS
A. Cold -Weather Protection: Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen subgrade or setting beds. Remove and replace unit paver work damaged by frost or freezing.

B. Weather Limitations for Adhesive Application:
(1) Apply adhesive only when ambient temperature is above 50 deg F and when temperature has not been below 35 deg F for 12 hours immediately before application. Do not apply when substrate is wet or contains excess moisture.

C. Weather Limitations for Mortar and Grout:
(1) Cold -Weather Requirements: Comply with cold -weather construction requirements contained in ACI 530.1/ASCE 6/TMS 602.
(2) Hot -Weather Requirements: Comply with hot -weather construction requirements contained in ACI 530.1/ASCE 6/TMS 602. Provide artificial shade and windbreaks, and use cooled materials as required. Do not apply mortar to substrates with temperatures of 100 deg F and higher. (a) When ambient temperature exceeds 100 deg F, or when wind velocity exceeds 8 mph and ambient temperature exceeds 90 deg F, set unit pavers within 1 minute of spreading setting -bed mortar.

1.08 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of tactile warning surfaces that fail in materials or workmanship within specified warranty period.
(1) Failures include, but are not limited to, the following:
(a) Deterioration of finishes beyond normal weathering and wear.

TACTILE WARNING SURFACING 32 17 26 - 2

Page 2264 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(b) Separation or delamination of materials and components. (2) Warranty Period: Five years minimum
PART 2 PRODUCTS

2.01 TACTILE WARNING SURFACING, GENERAL
A. Detectable warning surfaces shall comply with CBC Section 11 B-705.1.

B. Detectable warning surfaces at transit boarding platform edges, bus stops, hazardous vehicular areas, reflecting pools, and track crossings shall be yellow and approximate FS 33538 of Federal Standard 595C. Detectable warning surfaces at other locations shall be either the aforementioned yellow or a color providing a 70 percent minimum visual contrast with that of adjacent walking surfaces. The material used to provide visual contrast shall be an integral part of the surface. CBC Section 11B-705.1.1.3
C. Detectable warning surfaces shall differ from adjoining surfaces in resiliency or sound -on -cane contact. Such constraint shall not be required for detectable warning surfaces at curb ramps, islands, or cut -through medians. CBC Section 11B-705.1.1.4
D. Accessibility Requirements: Comply with applicable provisions in the 2016 California Building Code for tactile warning surfaces.
(1) For tactile warning surfaces composed of multiple units, provide units that when installed provide consistent side -to -side and end -to -end dome spacing that complies with requirements.

E. Source Limitations: Obtain each type of tactile warning surfacing, joint material, setting material, anchor, and fastener from single source with resources to provide materials and products of consistent quality in appearance and physical properties.

2.02 DETECTABLE WARNING TILES
A. Cast -in -Place Detectable Warning Tiles: Accessible truncated -dome detectable warning tiles with replaceable surface configured for setting flush in new concrete walkway surfaces, with slip -resistant surface treatment on domes and field of tile. (1) Material: Per product as specified on plans.
(2) Color: As specified on plans.
(3) Shapes and Sizes:
(a) Rectangular panel, 36 by 48 inches 36 by 60 inches
(4) Dome Spacing and Configuration: Spacing per California Building Code Section 11B-705.

TACTILE WARNING SURFACING 32 17 26 - 3

Page 2265 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(5) Mounting:
(a) Permanently embedded detectable warning tile wet -set into freshly poured concrete.
(b) Detectable warning tile set into formed recess in concrete and adhered with mortar or adhesive.
(c) Replaceable detectable warning tile wet -set into freshly poured concrete and surface -fastened to permanently embedded
anchors.

B. Surface -Applied Detectable Warning Tiles: Accessible truncated -dome detectable warning concrete tiles configured for surface application on existing concrete walkway surfaces, with slip -resistant surface treatment on domes, field of tile, and beveled outside edges.
(1) Material: Per product as specified on plans.
(2) Color: As specified on plans.
(3) Shapes and Sizes:
(a) Rectangular panel, 36 by 48 inches
(4) Dome Spacing and Configuration: California Building Code Section 11B- 705.
(5) Mounting: Adhered and fastened to existing concrete walkway.

C. Cast -in -Place Detectable Warning Metal Tiles: Accessible truncated -dome detectable warning metal tiles with replaceable surface configured for setting flush in new concrete walkway surfaces, with slip -resistant surface treatment on domes and field of tile.
(1) Material:
(a) Stainless -Steel Plate and Sheet: ASTM A 240/A 240M or ASTM A 666, Type 304 or Type 316L.
1) Finish and Color:
a) Manufacturer's standard powder coat, as specified
on plans.
b) Mill finish.
(b) Cast Iron: Gray iron, ASTM A 48/A 48M, CL 35.
(2) Shapes and Sizes:
(a) Rectangular panel, 36 by 48 inches

TACTILE WARNING SURFACING
321726-4

Page 2266 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(3) Dome Spacing and Configuration: California Building Code Section 11B- 705.
(4) Mounting:
(a) Permanently embedded detectable warning tile wet -set into freshly poured concrete.
(b) Permanently embedded detectable warning tile set into formed recess in concrete and adhered with mortar or adhesive. (c) Replaceable embedded detectable warning tile fastened to permanently installed anchors.

D. Surface -Applied Detectable Warning Metal Tiles: Accessible truncated -dome detectable warning metal tiles or plates configured for fastening to surface of existing concrete walkway surfaces, with slip -resistant surface treatment on domes, field of tile, and beveled outside edges.
(1) Material: Stainless -Steel Plate and Sheet: ASTM A 240/A 240M or ASTM A 666, Type 304 or Type 316L.
(2) Finish and Color:
(a) Manufacturer's standard powder coat, As specified on plans. (b) Mill finish.
(3) Shapes and Sizes:
(a) Rectangular panel, 36 by 48 inches
(4) Dome Spacing and Configuration: California Building Code Section 11B- 705.
(5) Mounting:
(a) Replaceable surface -applied detectable warning tile fastened with permanently installed anchors to existing concrete walkway. (b) Permanently fixed detectable warning tile adhered and fastened to existing concrete walkway.

2.03 DETECTABLE WARNING MATS
A. Surface -Applied Detectable Warning Mats: Accessible truncated -dome detectable warning resilient mats, UV resistant, manufactured for adhering to existing concrete walkway surfaces, with slip -resistant surface treatment on domes, field of mat, and beveled outside edges.
(1) Material: Modified rubber compound, UV resistant.

TACTILE WARNING SURFACING 32 17 26 - 5

Page 2267 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Color: Per Plan
(3) Shapes and Sizes:
(a) Rectangular panel, 24 by 48 inches
(4) Dome Spacing and Configuration: California Building Code Section 11B- 705.
(5) Mounting: Adhered to pavement surface with adhesive and fastened with fasteners.

2.04 ACCESSORIES
A. Fasteners and Anchors: Manufacturer's standard as required for secure anchorage of tactile warning surfaces, noncorrosive and compatible with each material joined, and complying with the following:
(1) Furnish Type 304 or Type 316 stainless -steel fasteners for exterior use. (2) Fastener Heads: For nonstructural connections, use flathead or oval countersunk screws and bolts with tamper -resistant heads, colored to match tile.

B. Adhesive: As recommended by manufacturer for adhering tactile warning surfacing unit to pavement.

C. Sealant: As recommended by manufacturer for sealing perimeter of tactile warning surfacing unit.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify that pavement is in suitable condition to begin installation according to manufacturer's written instructions. Verify that installation of tactile warning surfacing will comply with accessibility requirements upon completion.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.02 INSTALLATION OF TACTILE WARNING SURFACING
A. General: Prepare substrate and install tactile warning surfacing according to manufacturer's written instructions unless otherwise indicated.

B. Place tactile warning surfacing units in dimensions and orientation indicated.

Comply with location requirements of AASHTO MP 12.

3.03 INSTALLATION OF DETECTABLE WARNING TILES
A. Cast -in -Place Detectable Warning Tiles:

TACTILE WARNING SURFACING
321726-6

Page 2268 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Concrete Paving Installation: Comply with installation requirements in Section 321313 "Concrete Paving." Mix, place, and finish concrete to conditions complying with detectable warning tile manufacturer's written requirements for satisfactory embedment of tile.
(2) Set each detectable warning tile accurately and firmly in place and completely seat tile back and embedments in wet concrete by tamping or vibrating. If necessary, temporarily apply weight to tiles to ensure full contact with concrete.
(3) Set surface of tile flush with surrounding concrete and adjacent tiles, with variations between tiles and between concrete and tiles not exceeding plus or minus 1/8 inch from flush.
(4) Protect exposed surfaces of installed tiles from contact with wet concrete.

Complete finishing of concrete paving surrounding tiles. Remove concrete from tile surfaces.
(5) Clean tiles using methods recommended in writing by manufacturer.

B. Removable Cast -in -Place Detectable Warning Tiles:
(1) Concrete Paving Installation: Comply with installation requirements in Section 321313 "Concrete Paving." Mix, place, and finish concrete to conditions complying with detectable warning tile manufacturer's written requirements for satisfactory embedment of removable tile. (2) Set each detectable warning tile accurately and firmly in place with embedding anchors and fasteners attached, and firmly seat tile back in wet concrete by tamping or vibrating. If necessary, temporarily apply weight to tiles to ensure full contact with concrete.
(3) Set surface of tile flush with surrounding concrete and adjacent tiles, with variations between tiles and between concrete and tiles not exceeding plus or minus 1/8 inch from flush.
(4) Protect exposed surfaces of installed tiles from contact with wet concrete.

Complete finishing of concrete paving surrounding tiles. Remove concrete from tile surfaces.
(5)
Clean tiles using methods recommended in writing by manufacturer.

C. Surface -Applied Detectable Warning Tiles:
(1) Lay out detectable warning tiles as indicated and mark concrete pavement.
(2) Prepare existing paving surface by grinding and cleaning as recommended by manufacturer.

TACTILE WARNING SURFACING 32 17 26 - 7

Page 2269 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(a) Cut perimeter kerf in existing concrete pavement to receive metal tile flange.
(3)
Apply adhesive to back of tiles in amounts and pattern recommended by manufacturer, and set tiles in place. Firmly seat tiles in adhesive bed, eliminating air pockets and establishing full adhesion to pavement. If necessary, temporarily apply weight to tiles to ensure full contact with concrete.
(4) Install anchor devices through face of tiles and into pavement using anchors located as recommended by manufacturer. Set heads of anchors flush with top surface of mat.
(5) Mask perimeter of tiles and adjacent concrete, and apply sealant in continuous bead around perimeter of tile installation.
(6) Remove masking, adhesive, excess sealant, and soil from exposed surfaces of detectable warning tiles and surrounding concrete pavement using cleaning agents recommended in writing by manufacturer. (7)
Protect installed tiles from traffic until adhesive has set.

3.04 INSTALLATION OF DETECTABLE WARNING MATS
A. Lay out detectable warning mats as indicated and mark concrete pavement at edges of mats.

B. Lay out detectable warning mats as indicated and mark concrete pavement at edges of mats.

C. Apply adhesive to back of mat in amounts and pattern recommended by manufacturer, and set mat in place. Firmly seat mat in adhesive bed, eliminating air pockets and establishing full adhesion to pavement. If necessary, temporarily apply weight to mat to ensure full contact with adhesive.

D. Install anchor devices through face of mat and into pavement using anchors located as recommended by manufacturer. Set heads of anchors flush with mat surface.

E. Mask mat perimeter and adjacent concrete, and apply sealant in continuous bead around perimeter of mat.

F. Remove masking, adhesive, excess sealant, and soil from exposed surfaces of detectable warning mat and surrounding concrete pavement using cleaning agents recommended in writing by manufacturer.

G. Protect installed mat from traffic until adhesive has set.

3.05 INSTALLATION OF DETECTABLE WARNING UNIT PAVERS
A. Unit Paver Installation, General:

TACTILE WARNING SURFACING 32 17 26 - 8

Page 2270 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Setting -Bed and Unit Paver Installation: Comply with installation requirements in Section 321400 "Unit Paving."
(2) Mix unit pavers from several pallets or cubes, as they are placed, to produce uniform blend of colors and textures.
(3) Cut unit pavers with motor -driven masonry saw equipment to provide pattern indicated and to fit adjoining work neatly. Use full units without cutting where possible.
(4) Tolerances: Do not exceed 1/4 inch in 10 feet) from level, or indicated slope, for finished surface of paving.

B. Aggregate Setting -Bed Applications:
(1) Place aggregate base, compact by tamping with plate vibrator, and screed to depth indicated.
(2) Place leveling course and screed to a thickness of 1 to 1-1/2 inches, taking care that moisture content remains constant and density is loose and uniform until unit pavers are set and compacted.
(3) Treat leveling course with herbicide to inhibit growth of grass and weeds. (4) Set unit pavers with a minimum joint width of 1/16 inch and a maximum of 1/8 inch, being careful not to disturb leveling base. If pavers have spacer bars, place pavers hand tight against spacer bars. Use string lines to keep straight lines.
(5) Vibrate pavers into leveling course with a low -amplitude plate vibrator capable of a 3500- to 5000-Ibf compaction force at 80 to 90 Hz. (6) Spread dry sand and fill joints immediately after vibrating pavers into leveling course. Vibrate pavers and add sand until joints are completely filled, then remove excess sand. Leave a slight surplus of sand on the surface for joint filling.

C. Mortar Setting -Bed Applications:
(1) Saturate concrete subbase with clean water several hours before placing setting bed. Remove surface water about one hour before placing setting bed.
(2) Apply mortar -bed bond coat over surface of concrete subbase about 15 minutes before placing mortar bed. Limit area of bond coat to avoid its drying out before placing setting bed. Do not exceed 1/16 -inch thickness for bond coat.
(3)
Apply mortar bed over bond coat; spread and screed mortar bed to uniform thickness at subgrade elevations required for accurate setting of pavers to finished grades indicated.

TACTILE WARNING SURFACING 32 17 26 - 9

Page 2271 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(4) Mix and place only that amount of mortar bed that can be covered with pavers before initial set. Before placing pavers, cut back, bevel edge, and remove and discard setting -bed material that has reached initial set. (5) Place pavers before initial set of cement occurs. Immediately before placing pavers on mortar bed, apply uniform 1/16 -inch thick bond coat to mortar bed or to back of each paver with a flat trowel. (6) Tamp or beat pavers with a wooden block or rubber mallet to obtain full contact with setting bed and to bring finished surfaces within indicated tolerances. Set each paver in a single operation before initial set of mortar; do not return to areas already set or disturb pavers for purposes of realigning finished surfaces or adjusting joints.
(7) Spaced Joint Widths: Provide 3/8 -inch nominal joint width with variations not exceeding plus or minus 1/8 inch.
(8) Grouted Joints: Grout paver joints complying with ANSI A108.10. Grout joints as soon as possible after initial set of setting bed. (a) Force grout into joints, taking care not to smear grout on adjoining surfaces.
(b) Tool exposed joints slightly concave when thumbprint hard. (c) Cure grout by maintaining in a damp condition for seven days unless otherwise recommended by grout or liquid -latex
manufacturer.
(9) Remove excess grout from exposed paver surfaces; wash and scrub clean.
(10) Protect installation from traffic until grout has set.

3.06 CLEANING AND PROTECTION
A. Remove and replace tactile warning surfacing that is broken or damaged or does not comply with requirements in this Section. Remove in complete sections from joint to joint unless otherwise approved by Architect. Replace using tactile warning surfacing installation methods acceptable to Architect.

B. Protect tactile warning surfacing from damage and maintain free of stains, discoloration, dirt, and other foreign material.

END OF SECTION 32 17 26
TACTILE WARNING SURFACING 32 17 26 -10

Page 2272 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 31 19

DECORATIVE METAL FENCES AND GATES
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Guardrails

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.

B. Shop Drawings: For guardrails.

1. Include plans, elevations, sections, post spacing, and mounting attachment details.

C. Samples: For each fence material and for each color specified.

1. Provide Samples 12 inches in length for linear materials.

1.3 QUALITY ASSURANCE
A. Installer Qualifications: Fabricator of products.

B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for fabrication and installation.

1. Include 10 -foot length of fence complying with requirements.

2. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

PART 2 - PRODUCTS

2.1 Product Information
A. Guardrail: See plans for product information.

DECORATIVE METAL FENCES AND GATES

Page 2273 of 3058 ends

32 31 19-1

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for site clearing, earthwork, pavement work, construction layout, and other conditions affecting performance of the Work.

B. Do not begin installation before final grading is completed unless otherwise permitted by Landscape Architect.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Stake locations of fence lines, gates, and terminal posts. Indicate locations of utilities, lawn sprinkler system, underground structures, benchmarks, and property monuments.

3.3 DECORATIVE FENCE INSTALLATION
A. Install fences according to manufacturer's written instructions.

END OF SECTION 32 31 19

DECORATIVE METAL FENCES AND GATES

Page 2274 of 3058 ends

32 31 19-2

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 33 00

SITE FURNISHINGS
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Picnic Tables

2. Benches

3. Timber Benches

4. Swing Benches

5. Trash and Recycling Container

6. Outdoor Shower

7. Basketball Post, Backboard, and Net

8. Pickleball Net Posts and Ground Sockets/Cover Plate

9. Shade Sails

1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.

B. Submit shop drawings to the City for approval before installing any manufactured items. Plans shall include dimensions, color, finish, structural design (custom items), connection details, and installation instructions.

C. Submit catalog cuts, samples and manufacturers literature of all manufactured items in this section to the City for approval before installation.

D. Provide color samples, brushouts, or charts for all items. Final colors to be selected by City and a sample submitted for approval.

E. Product Schedule: For site furnishings. Use same designations indicated on Drawings.

F. Material Certificates: For site furnishings, signed by manufacturers.

1.3 INFORMATIONAL SUBMITTALS
A. Material Certificates: For site furnishings, signed by manufacturers.

1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For site furnishings to include in maintenance manuals.

Page 2275 of 3058 ends

SITE FURNISHINGS 32 33 00 -1

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

PART 2 - PRODUCTS

2.1 MANUFACTURED ITEMS
A. Picnic Tables: See Plans
B. Benches: See Plans
C. Timber Benches: See Plans
D. Swing Benches: See Plans
E. Trash and Recycling Container: See Plans
F. Basketball Post, Backboard, and Net: See Plans
G. Pickleball Net Posts and Ground Sockets/Cover Plate: See Plans H. Shade Sails: See Plans
PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for correct and level finished grade, mounting surfaces, installation tolerances, and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
A. Comply with manufacturer's written installation instructions unless more stringent requirements are indicated. Complete field assembly of site furnishings where required.

B. Unless otherwise indicated, install site furnishings after landscaping and paving have been completed.

C. Install site furnishings level, plumb, true, and securely anchored at locations indicated on Drawings.

D. Post Setting: Set cast -in support posts in concrete footing with smooth top, shaped to shed water. Protect portion of posts above footing from concrete splatter. Verify that

Page 2276 of 3058 ends

SITE FURNISHINGS 32 33 00 - 2

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
posts are set plumb or at correct angle and are aligned and at correct height and spacing. Hold posts in position during placement and finishing operations until concrete is sufficiently cured.

END OF SECTION 32 33 00

Page 2277 of 3058 ends

SITE FURNISHINGS 32 33 00 - 3

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 84 00

LANDSCAPE IRRIGATION
PART 1 - GENERAL

1.1 SUMMARY
A. It is the intent of the specifications and drawings that the finished system is complete in every respect and shall be ready for operation satisfactory to the City.

B. The work shall include all materials, labor, services, transportation, and equipment necessary to perform the work as indicated on the drawings, in these specifications, and as necessary to complete the contract.

1.2 CONSTRUCTION DRAWINGS
A. All offsets, fittings, sleeves, etc. which may be required are not shown on the drawings. The Contractor shall carefully investigate the structural and finished conditions affecting the work and plan the work accordingly, furnishing such fittings, etc. as may be required to meet such conditions. The work shall be installed in such a manner as to avoid conflicts between irrigation systems, planting, and architectural features.

B. All work called for on the drawings by notes or details shall be furnished and installed whether or not specifically mentioned in the specifications. When an item is shown on the plans but not shown on the specifications or vice versa, it shall be deemed to be as shown on both. The Landscape Architect shall have final authority for clarification
C. The Contractor shall not willfully install the irrigation system as shown on the drawings when it is obvious in the field that obstructions, grade differences or discrepancies in area dimensions exist that might not have been considered in engineering. Such obstructions or differences should be brought to the attention of the Landscape Architect as soon as detected. In the event this notification is not performed, the Irrigation Contractor shall assume full responsibility for any revision necessary.

1.3 QUALITY ASSURANCE
A. Provide at least one English speaking person who shall be present at all times during execution of this portion of the work and who shall be thoroughly familiar with the type of materials being installed and the manufacturer's recommended methods of installation and who shall direct all work performed under this section.

B. Manufacturer's directions and detailed drawings shall be followed in all cases where the manufacturer of articles used in this contract furnish directions covering points not shown in the drawings and specifications.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-1

Page 2278 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. All local, municipal, and state laws, rules and regulations governing or relating to any portion of this work are hereby incorporated into and made a part of these specifications, and their provisions shall be carried out by the Contractor. Anything contained in these specifications shall not be construed to conflict with any of the above rules and regulations of the same. However, when these specifications and drawings call for or describe materials, workmanship, or construction of a better quality, higher standard, or larger size than is required by the above rules and regulations, the provisions of these specifications and drawings shall take precedence.

D. All materials supplied for this project shall be new and free from any defects. All defective materials shall be replaced immediately at no additional cost to City.

E. Secure the required licenses and permits including payments of charges and fees, give required notices to public authorities and verify permits secured or arrangements made by others affecting the work of this section.

1.4 SUBMITTALS
A. Water Pressure Test

1. After award of contract and before any irrigation system materials are ordered from suppliers or delivered to the job site, submit to the City a written verification of the existing water pressure on the project at each of the points of connection shown.

2. The water pressure test shall be performed to measure the dynamic water pressure at the point of connection at the maximum flow rate of the proposed irrigation system as shown on the point of connection note. Dynamic water pressure is when water is flowing through the point of connection. Static water pressure readings when water is not flowing, are not acceptable.

3. Written dynamic water pressure test confirmation shall be made on the contractor's letterhead and include the flow rate during the test, the recorded water pressure, the date of the test and the time of the test.

B. Material List:

1. After award of contract and before any irrigation system materials are ordered from suppliers or delivered to the job site, submit to the City a complete list of all irrigation system materials, or processes proposed to be furnished and installed as part of this contract.

2. The submittal materials list shall include the following information:
a. A title sheet with the job name, the contractor's name, contractor's address and telephone number, submittal date and submittal number. b. An index sheet showing the item number (e.g. 1,2,3, etc.); an item description (e.g. sprinkler head); the manufacturer's name (e.g. Hunter Industries); the item model number (e.g. I-40-ADV/36V); and the page(s) in the submittal set that contain the catalog cuts.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-2

Page 2279 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
c. The catalog cuts shall be one or two pages copied from the most recent manufacturer's catalog that indicate the product submitted. Do not submit parts lists, exploded diagrams, price lists or other extra information. d. The catalog cuts shall clearly indicate the manufacturer's name and the item model number. The item model number, all specified options and specified sizes shall be circled on the catalog cuts.
e. Submittals for equipment indicated on the legend without manufacturer names, or "as approved", shall contain the manufacturer, Class or Schedule, ASTM numbers and/or other certifications as indicated in these specifications.

3. Submittal materials list format requirements:
a. Submittals shall be provided as one complete package for the project in electronic pdf format. Multiple partial submittals will not be reviewed. b. Submittal package shall have all pages numbered in the lower right hand corner. Page numbers shall correspond with submittal index. c. Re -submitted packages must be revised to include only the equipment being re -submitted. Equipment previously reviewed and accepted shall not be re -submitted in the materials list/index sheet or in the catalog cut sheet package.

C. Substitutions: If the Irrigation Contractor wishes to substitute any equipment or materials for those equipment or materials listed on the irrigation drawings and specifications, he may do so by providing the following information to the Landscape Architect or City's authorized representative for approval.

1. Provide a written statement indicating the reason for making the substitution.

2. Provide catalog cut sheets, technical data, and performance information for each substitute item.

3. Provide in writing the difference in installed price if the item is accepted.

D. The Landscape Architect or City's authorized representative will allow no substitutions without prior written acceptance
E. No substitutions of pump manufacturers, distributors or assemblies will be accepted.

F. Manufacturer's warranties shall not relieve the Contractor of his liability under the guarantee. Such warranties shall only supplement the guarantee.

G. The Landscape Architect or City's authorized representative will not review the submittal package unless provided in the format described above.

1.5 EXISTING CONDITIONS
A. Verify and be familiar with the locations, size and detail of points of connection provided as the source of water, electrical supply, and cellular connection to the irrigation system.

B. Irrigation design is based on the available static water pressure shown on the drawings. Contractor shall verify static water on the project prior to the start of construction. Should a discrepancy exist, notify the Landscape Architect and City's authorized representative prior to beginning construction.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-3

Page 2280 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Prior to cutting into the soil, locate all cables, conduits, sewer septic tanks, and other utilities as are commonly encountered underground, and take proper precautions not to damage or disturb such improvements. If a conflict exists between such obstacles and the proposed work, the Contractor shall promptly notify the Landscape Architect and City who will arrange for relocations. The Contractor will proceed in the same manner if a rock layer or any other such conditions are encountered.

D. Protect all existing utilities and features to remain on and adjacent to the project site during construction. Repair, at its own cost, all damage resulting from his operations or negligence.

E. The Irrigation Contractor shall coordinate with the General Contractor for installation of required sleeving as shown on the plans prior to paving operations.

F. Verify and be familiar with the existing irrigation systems in areas adjacent to and within the Project area of work.

G. Protect all existing irrigation systems, in areas adjacent to and within the project area of work, from damage due to his operations.

H. Notify City's Representative if any existing system is temporarily shut off, capped or modified. Provide 48 -hour notice, prior to turning off or modifying any existing irrigation system.

I. Repair or replace all existing irrigation systems, in areas adjacent to and within the project area of work, damaged by the construction of this project. Adjacent irrigation systems shall be made completely operational and provide complete coverage of the existing landscaped areas. All repairs shall be complete to the satisfaction of the City's Representative.

J. Provide bore holes under any existing pavement or paving encountered for the required lateral, mainline and low voltage control wire sleeving. Bore holes under 2 inches in diameter and smaller shall be made with a BulletMole® underground boring tool as manufactured by Dimension Tools, LLC (Contact telephone number (888)- 650-5554 or at www.bulletmole.com) . Bore holes larger than 2 inches in diameter shall be made with an approved mechanical boring tool. No air jacking or hydraulic boring of any kind shall be allowed.

1.6 INSPECTIONS
A. The Contractor shall permit the Landscape Architect and City's authorized representative to visit and inspect at all times any part of the work and shall provide safe access for such visits.

B. Where the specifications require work to be tested by the Contractor, it shall not be covered over until accepted by the Landscape Architect, City's authorized representative, and/or governing agencies. The Contractor shall be solely responsible for notifying the Landscape Architect, City, and governing agencies, a minimum of 48 hours in advance, where and when the work is ready for testing.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-4

Page 2281 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
Should any work be covered without testing or acceptance, it shall be, if so ordered, uncovered at the Contractor's expense.

C. Inspections will be required for the following at a minimum:
1 Pre -construction meeting.

2. System layout.

3. Pressure test of irrigation mainline (Four hours at 125 PSI or 120% of static water pressure, whichever is greater.) Mainline pressure loss during test shall not exceed 2 PSI.

4. Coverage test of irrigation system. Test shall be performed prior to any planting.

5. Final inspection prior to start of maintenance period.

6. Final acceptance prior to turnover.

D. Site observations and testing will not commence without the field record drawings as prepared by the Irrigation Contractor. Record drawings must be complete and up to date for each site visit.

E. Work that fails testing and is not accepted will be retested. Hourly rates and expenses of the Landscape Architect, City's authorized representative, and governing agencies for re -inspection or retesting will be paid by the Irrigation Contractor at no additional expense to City.

1.7 STORAGE AND HANDLING
A. Use all means necessary to protect irrigation system materials before, during, and after installation and to protect the installation work and materials of all other trades.

In the event of damage, immediately make all repairs and replacements necessary to the acceptance of the Landscape Architect and City and at no additional cost to the City.

B. Exercise care in handling, loading, unloading, and storing plastic pipe and fittings under cover until ready to install. Transport plastic pipe only on a vehicle with a bed long enough to allow the pipe to lay flat to avoid undue bending and concentrated external load.

1.8 CLEANUP AND DISPOSAL
A. Dispose of waste, trash, and debris in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction. Bury no such waste material and debris on the site. Burning of trash and debris will not be permitted.

Remove and dispose of rubbish and debris at frequent intervals or when ordered to do so by the City's authorized representative.

B. At the time of completion the entire site will be cleared of tools, equipment, rubbish and debris which shall be disposed of off -site in a legal disposal area.

1.9 TURNOVER ITEMS
A. Record Drawings:

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-5

Page 2282 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

1. Record accurately on one set of drawings all changes in the work constituting departures from the original contract drawings and the actual final installed locations of all required components as shown below.

2. The record drawings shall be prepared to the satisfaction of the City. Prior to final inspection of work, submit record drawings to the Landscape Architect or City's authorized representative.

3. All record drawings shall be prepared using AutoCAD 2023 drafting software and the original irrigation drawings as a base. No manual drafted record drawings shall be acceptable. The Contractor may obtain digital base files from the Landscape Architect or City's authorized representative.

4. If the Contractor is unable to provide the AutoCAD drafting necessary for the record drawings the irrigation designer does provide record drawing drafting as a separate service.

5. Prior to final inspection of work, submit record drawings plotted onto vellum sheets for review by the Landscape Architect or City's authorized representative.

After acceptance by the Landscape Architect, City Inspector or City's authorized representative re -plot the record drawings onto reproducible Mylar sheets. The Contractor shall also provide record drawing information on a digital AutoCAD Release 2023 drawing file. All digital files shall be provided on a compact disc (CD) clearly marked with the project name, file descriptions and date. a. Record drawing information and dimensions shall be collected on a day-to- day basis during the installation of the pressure mainline to fully indicate all routing locations and pipe depths. Locations for all other irrigation equipment shall be collected prior to the final inspection of the work. b. Two dimensions from two permanent points of reference such as buildings, sidewalks, curbs, streetlights, hydrants, etc. shall be shown for each piece of irrigation equipment shown below. Where multiple components are installed with no reasonable reference point between the components, dimensioning may be made to the irrigation equipment. All irrigation symbols shall be clearly shown matching the irrigation legend for the drawings. All lettering on the record drawings shall be minimum 1/8 inch in size.

6. Show locations and depths of the following items:
a. Point of connection (including water POC, backflow devices, master control valves, flow sensors, etc.)
b. Routing of sprinkler pressure main lines (dimensions shown at a maximum of 100 feet along routing)
c. Isolation valves
d. Automatic remote control valves (indicate station number and size) e. Quick coupling valves
f. Drip air relief and flush valves
g. Routing of control wires where separate from irrigation mainline h. Irrigation controllers (indicate controller number and station count) i. Related equipment (as may be directed)
B. Controller Charts:

1. Provide one controller chart for each automatic controller. Chart shall show the area covered by the particular controller. The areas covered by the individual control valves shall be indicated using colored highlighter pens. A minimum of LANDSCAPE IRRIGATION DOCUMENT 32 84 00-6

Page 2283 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
six individual colors shall be used for the controller chart unless less than six control valves are indicated.

2. Landscape Architect or City's authorized representative must approve record drawings before controller charts are prepared.

3. The chart is to be a reduced copy of the actual "record" drawing. In the event the controller sequence is not legible when the drawing is reduced, it shall be enlarged to a readable size.

4. When completed and approved, the chart shall be hermetically sealed between two pieces of plastic, each piece being a minimum 20 mils in thickness.

C. Operation and Maintenance Manuals:

1. Two individually bound copies of operation and maintenance manuals shall be delivered to the Landscape Architect or City's authorized representative at least 10 calendar days prior to final inspection. The manuals shall describe the material installed and the proper operation of the system.

2. Each complete, bound manual shall include the following information:

3. Index sheet stating Contractor's address and telephone number, duration of guarantee period, list of equipment including names and addresses of local manufacturer representatives.
a. Operating and maintenance instructions for all equipment. b. Spare parts lists and related manufacturer information for all equipment.

D. Equipment:

1. Supply as a part of this contract the following items:
a. Two (2) wrenches for disassembly and adjustment of each type of sprinkler head used in the irrigation system.
b. Three 30 -inch sprinkler keys for manual operation of control valves. c. Two keys for each automatic controller.
d. Two quick coupler keys with a 1" bronze hose bib, bent nose type with hand wheel and two coupler lid keys.
e. One valve box cover key or wrench.
f. Six extra sprinkler heads of each size and type.
g. For specified ball valves if required: One (1) 5 -foot long valve handle, to fit the specified ball valves.

2. The above equipment shall be turned over to City's authorized representative at the final inspection.

1.10 COMPLETION
A. At the time of the pre -maintenance period inspection, the Landscape Architect, City's authorized representative, and governing agencies will inspect the work, and if not accepted, will prepare a list of items to be completed by the Contractor. Punch list to be checked off by contractor and submitted to Landscape Architect or City's authorized representative prior to any follow-up meeting. This checked off list to indicate that all punch list items have been completed. At the time of the post - maintenance period or final inspection the work will be re -inspected and final acceptance will be in writing by the Landscape Architect, City's authorized representative, and governing agencies.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-7

Page 2284 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. The City's authorized representative shall have final authority on all portions of the work.

C. After the system has been completed, the Contractor shall instruct City's authorized representative in the operation and maintenance of the irrigation system and shall furnish a complete set of operating and maintenance instructions.

D. Any settling of trenches which may occur during the one-year period following acceptance shall be repaired to the City's satisfaction by the Contractor without any additional expense to the City. Repairs shall include the complete restoration of all damage to planting, paving or other improvements of any kind as a result of the work.

1.11 GUARANTEE
A. The entire sprinkler system, including all work done under this contract, shall be unconditionally guaranteed against all defects and fault of material and workmanship, including settling of backfilled areas below grade, for a period of one (1) year following the filing of the Notice of Completion.

B. Should any problem with the irrigation system be discovered within the guarantee period, it shall be corrected by the Contractor at no additional expense to City within ten (10) calendar days of receipt of written notice from City. When the nature of the repairs as determined by the City constitute an emergency (i.e. broken pressure line) the City may proceed to make repairs at the Contractor's expense. Any and all damages to existing improvement resulting either from faulty materials or workmanship, or from the necessary repairs to correct same, shall be repaired to the satisfaction of the City by the Contractor, all at no additional cost to the City.

C. Guarantee shall be submitted on Contractors own letterhead as follows:

GUARANTEE FOR SPRINKLER IRRIGATION SYSTEM
We hereby guarantee that the sprinkler irrigation system we have furnished and installed is free from defects in materials and workmanship, and the work has been completed in accordance with the drawings and specifications, ordinary wear and tear and unusual abuse, or neglect excepted. We agree to repair or replace any defective material during the period of one year from date of filing of the Notice of Completion and also to repair or replace any damage resulting from the repairing or replacing of such defects at no additional cost to the City. We shall make such repairs or replacements within 10 calendar days following written notification by the City. In the event of our failure to make such repairs or replacements within the time specified after receipt of written notice from City, we authorize the City to proceed to have said repairs or replacements made at our expense and we will pay the costs and charges therefore upon demand.

PROJECT NAME:

PROJECT LOCATION:

CONTRACTOR NAME:

ADDRESS:

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-8

Page 2285 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
TELEPHONE:

SIGNED:

DATE:

PART 2 - MATERIALS

2.1 SUMMARY
Use only new materials of the manufacturer, size and type shown on the drawings and specifications. Materials or equipment installed or furnished that do not meet Landscape Architect's, City's, or governing agencies standards will be rejected and shall be removed from the site at no expense to the City.

2.2 PIPE
A. Pressure supply line between the water meter and the backflow prevention device shall be type K copper, one size larger than backflow device.

B. Backflow prevention assemblies, and all other above grade assemblies, shall be constructed of threaded brass pipe and threaded brass fittings the same size as the backflow device, unless otherwise directed.

C. Pressure supply lines 1 1/2 inches in diameter and smaller downstream of the backflow prevention unit shall be Schedule 40 solvent weld PVC conforming to ASTM D1785.

D. Pressure supply lines 2 inches in diameter and up to 3 inches in diameter downstream of backflow prevention unit shall be Class 315 solvent weld PVC. Piping shall conform to ASTM D2241.

E. Non -pressure lines 3/4 inch in diameter and larger downstream of the remote control valve shall be SCH 40 solvent weld PVC conforming to ASTM D1785.

F. Recycled water PVC pipe to be color -coded purple in color marked on two sides with recycled water warning statements "Caution -Recycled Water". Recycled water piping must be accepted by the local recycled water governing agencies.

2.3 METAL PIPE AND FITTINGS
A. Brass pipe shall be 85 percent red brass, ANSI, IPS Standard 125 pounds, Schedule 40 screwed pipe.

B. Fittings shall be medium brass, screwed 125 -pound class.

C. Copper pipe and fittings shall be Type "K" sweat soldered, or brazed as indicated on the drawings.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-9

Page 2286 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2.4 PLASTIC PIPE AND FITTINGS
A. Pipe shall be marked continuously with manufacturer's name, nominal pipe size, schedule or class, PVC type and grade, National Sanitation Foundation approval, Commercial Standards designation, and date of extrusion.

B. All plastic pipe shall be extruded of an improved PVC virgin pipe compound in accordance with ASTM D2672, ASTM D2241 or ASTM D1785.

C. All solvent weld PVC fittings shall be standard weight Schedule 40 (and Schedule 80 where specified on the irrigation detail sheet, all mainline fittings shall be Schedule 80 PVC) and shall be injection molded of an improved virgin PVC fitting compound. Slip PVC fittings shall be the "deep socket" bracketed type. Threaded plastic fittings shall be injection molded. All tees and ells shall be side gated. All fittings shall conform to ASTM D2464 and ASTM D2466.

D. All threaded nipples shall be standard weight Schedule 80 with molded threads and shall conform to ASTM D1785.

E. All solvent cementing of plastic pipe and fittings shall be a two-step process, using primer and solvent cement applied per the manufacturer's recommendations.

Cement shall be of a fluid consistency, not gel -like or ropy. Solvent cementing shall be in conformance with ASTM D2564 and ASTM D2855.

F. When connection is plastic to metal, female adapters shall be hand tightened, plus one turn with a strap wrench. Joint compound shall be non -lead base Teflon paste, tape, or equal.

G. All pressure mainlines installed with solvent weld PVC fittings shall be installed with concrete thrust blocking at all directional changes in the mainline routing. Concrete thrust blocking shall not be required when ductile iron fittings and mechanical restraints are specified.

2.5 BACKFLOW PREVENTION UNITS
A. The backflow prevention unit shall be of the manufacturer, size, and type indicated on the drawings.

B. The backflow prevention unit shall be installed in accordance with the requirements set forth by local codes.

C. The backflow enclosure shall be of the manufacturer, size, and type indicated on the drawings.

D. The backflow freeze prevention cover shall be of the manufacturer, size, and type indicated on the drawings.

2.6 VALVES
A. Ball Valves:

LANDSCAPE IRRIGATION DOCUMENT
32 84 00-10

Page 2287 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

1. Ball valves shall be of the manufacturer, size, and type indicated on the drawings.

2. All ball valves shall have a minimum working pressure of not less than 150 PSI and shall conform to AWWA standards.

B. Quick Coupler Valves:

1. Quick coupler valves shall be of the manufacturer, size, and type indicated on the drawings.

2. Quick coupler valves shall be brass with a wall thickness guaranteed to withstand normal working pressure of 150 psi without leakage. Valves shall have 1" female threads opening at base, with two-piece body. Valves to be operated only with a coupler key, designed for that purpose. Coupler key is inserted into valve and a positive, watertight connection shall be made between the coupler key and valve.

3. Vinyl quick coupler cover to be purple in color with the words "Warning -Recycled Water -Do Not Drink" permanently marked on lid.

C. Automatic Control Valves:

1. Automatic control valves shall be of the manufacturer, size, and type indicated on the drawings.

2. Automatic control valves shall be electrically operated.

3. Provide Christy's valve ID tags for each remote control valve with valve number.

2.7 VALVE BOXES
A. Valve boxes shall be fabricated from a durable, weather -resistant plastic material resistant to sunlight and chemical action of soils.

B. The valve box cover shall be secured with a hidden latch mechanism or bolts.

C. Valve box extensions shall be by the same manufacturer as the valve box.

D. The plastic irrigation valve box cover shall be an overlapping type.

E. Automatic control valve, master valve, and flow sensor boxes shall be 17"x11 "x12" 'nominal' rectangular size. Valve boxes for drip valve assemblies shall be Jumbo valve boxes size as required to fit assemblies. Valve box covers shall be marked "RCV" with the valve identification number, or "MV", "FS" "heat branded" onto the cover in 1-1/4 inch high letters / numbers.

F. Quick coupler and ball valve boxes shall be 10" circular size. Valve box covers shall be marked with "QCV" or "BV" "heat branded" onto the cover in 1-1/4 inch high letters.

G. Valve box cover shall be permanently marked (attached tags are not acceptable) on valve box cover plate with the words "Warning -Recycled Water -Do Not Drink".

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-11

Page 2288 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2.8 AUTOMATIC CONTROLLER
A. Automatic controller shall be of the manufacturer, size, and type indicated on the drawings.

B. Controller enclosure shall be of the manufacturer, size, and type indicated on the drawings.

C. Controller shall be grounded according to local codes using equipment of the manufacturer, size, and type indicated on the drawings; or as required by local codes and ordinances.

2.9 ELECTRICAL
A. All electrical equipment shall be NEMA Type 3, waterproofed for exterior installations.

B. All electrical work shall conform to local codes and ordinances.

2.10 LOW VOLTAGE CONTROL WIRING
A. Remote control wire shall be direct -burial AWG-UF type, size as indicated on the drawings, and in no case smaller than 14 gauge.

B. Connections shall of the manufacturer, size, and type indicated on the drawings.

C. Common wires shall be white in color. Control wires shall be red (where two or more controllers are used, the control wires shall be a different color for each controller.

These colors shall be noted on the "Record Drawings" plans located on controller door).

D. Ground wires shall be green in color or bare copper and in no case smaller than 6 gauge.

2.11 IRRIGATION HEADS, DRIP EMITTERS, AND INLINE DRIP TUBING A. Irrigation heads, drip emitters, and inline drip tubing shall be of the manufacturer, size, type, with radius of throw, operating pressure, and discharge rate indicated on the drawings.

B. Irrigation heads, drip emitters, and inline drip tubing shall be used as indicated on the drawings.

C. Irrigation heads shall have purple recycled water warning cover.

2.12 DRIP IRRIGATION EQUIPMENT
Drip tubing equipment such as flush valves, wye strainers, and pressure regulators shall be of the manufacturer, size, and type indicated on the drawings.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-12

Page 2289 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2.13 MISCELLANEOUS EQUIPMENT
A. Landscape Fabric:

1. Landscape fabric for valve box assemblies shall be 5.0- oz. weight woven polypropylene weed barrier. Landscape fabric shall have a burst strength of 225 PSI, a puncture strength of 60 lbs. and capable of water flow of 12 gallons per minute per square foot.

2. Type: DeWitt Pro 5 Weed Barrier or approved equal.

B. Equipment such as flow sensors, rain sensors, freeze sensors, flush valves, air relief valves, wye strainers, and master valves shall be of the manufacturer, size and type indicated on the drawings.

PART 3 - EXECUTION

3.1 SITE CONDITIONS
A. Inspections:

1. Prior to all work of this section, carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this installation may properly commence.

2. Verify that irrigation system may be installed in strict accordance with all pertinent codes and regulations, the original design, the referenced standards, and the manufacturer's recommendations.

B. Discrepancies:

1. In the event of discrepancy, immediately notify the Landscape Architect or City's authorized representative.

2. Do not proceed with installation in areas of discrepancy until all discrepancies have been resolved.

C. Grades:

1. Before starting work, carefully check all grades to determine that work may safely proceed, keeping within the specified material depths with respect to finish grade.

2. Final grades shall be accepted by the Engineer before work on this section will be allowed to begin.

D. Field Measurements:

1. Make all necessary measurements in the field to ensure precise fit of items in accordance with the original design. Contractor shall coordinate the installation of all irrigation materials with all other work.

2. All scaled dimensions are approximate. The Contractor shall check and verify all size dimensions prior to proceeding with work under this section.

3. Exercise extreme care in excavating and working near existing utilities.

Contractor shall be responsible for damages to utilities, which are caused by his operations or neglect.

E. Diagrammatic Intent:

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-13

Page 2290 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
The drawings are essentially diagrammatic. The size and location of equipment and fixtures are drawn to scale where possible. Provide offsets in piping and changes in equipment locations as necessary to conform with structures and to avoid obstructions or conflicts with other work at no additional expense to City.

F. Layout:

1. Prior to installation, the Contractor shall stake out all pressure supply lines, routing and location of sprinkler heads, valves, backflow preventer, and automatic controller.

2. Layout irrigation system and make minor adjustments required due to differences between site and drawings. Where piping is shown on drawings under paved areas, but running parallel and adjacent to planted areas, install the piping in the planted areas.

G. Water Supply:

Connections to, or the installation of, the water supply shall be at the locations shown on the drawings. Minor changes caused by actual site conditions shall be made at no additional expense to City.

H. Electrical Service:

1. Connections to the electrical supply shall be at the locations shown on the drawings. Minor changes caused by actual site conditions shall be made at no additional expense to City.

2. Contractor shall make electrical connections to the irrigation controller.

Electrical power source to controller locations shall be provided by others.

3. Contractor shall make electrical connections to the irrigation controller. .

3.2 TRENCHING
A. Excavations shall be straight with vertical sides, even grade, and support pipe continuously on bottom of trench. Trenching excavation shall follow layout indicated on drawings to the depths below finished grade and as noted. Where lines occur under paved area, these dimensions shall be considered below subgrade.

B. Provide minimum cover of 18 inches on pressure supply lines 2'/2 inches and smaller.

C. Provide minimum cover of 24 inches on pressure supply lines 3 inches and larger.

D. Provide minimum cover of 18 inches for control wires within planters.

E. Provide minimum cover of 24 inches for control wires within sleeves below paving.

F. Provide minimum cover of 36 inches on pressure supply lines under vehicular travel ways.

G. Provide minimum cover of 12 inches for non -pressure lines.

H. Pipes installed in a common trench shall have a 4 -inch minimum space between pipes.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-14

Page 2291 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3.3 THRUST BLOCKS
A. Thrust blocks must be constructed of Class "B" concrete.

B. Thrust blocks shall be poured against undisturbed site soil.

C. PVC fitting joints shall be kept free of concrete. Do not encase fitting in concrete.

D. Thrust blocking shall be sized to provide the minimum bearing areas as shown below.

Bearing areas indicated have been calculated for Class 200 PVC pipe at a test pressure of 150 PSI in soil with 2,000 PSI bearing capacity. Increase thrust block sizing as necessary for varying soil conditions.

1. Provide a minimum thrust block bearing area of 2.0 square feet on all bends (all degrees) and tees installed on pressure supply lines 4 inches and smaller.

3.4 BACKFILLING
A. Backfill material on all lines shall be the same as adjacent soil free of debris, litter, and rocks over 1/2 inches in diameter.

B. Backfill shall be tamped in 4 -inch layers under the pipe and uniformly on both sides for the full width of the trench and the full length of the pipe. Backfill materials shall be sufficiently damp to permit thorough compaction, free of voids. Backfill shall be compacted to dry density equal to adjacent undisturbed soil and shall conform to adjacent grades.

C. Flooding in lieu of tamping is not allowed.

D. Under no circumstances shall truck wheels be used to compact backfill.

E. Provide sand backfill over and under all piping under paved areas.

3.5 PIPING
A. Piping under existing pavement may be installed by jacking, boring, or hydraulic driving. No hydraulic driving is permitted under asphalt pavement.

B. Cutting or breaking of existing pavement is not permitted.

C. Carefully inspect all pipe and fittings before installation, removing dirt, scale, burrs, and reaming. Install pipe with all markings up for visual inspection and verification.

D. Remove all dented and damaged pipe sections.

E. All lines shall have a minimum clearance of 4 inches from each other and 12 inches from lines of other trades.

F. Parallel lines shall not be installed directly over each other.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-15

Page 2292 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
G. In solvent welding, use only the specified primer and solvent cement and make all joints in strict accordance with the manufacturer's recommended methods including wiping all excess solvent from each weld. Allow solvent welds at least 15 minutes setup time before moving or handling and 24 hours curing time before filling.

H. PVC pipe shall be installed in a manner, which will provide for expansion and contraction as recommended by the pipe manufacturer.

I. Center load all plastic pipe prior to pressure testing.

J. All threaded plastic -to -plastic connections shall be assembled using Teflon tape or Teflon paste.

K. For plastic -to -metal connections, work the metal connections first. Use a non - hardening pipe dope an all threaded plastic -to -metal connections, except where noted otherwise. All plastic -to -metal connections shall be made with plastic male adapters.

3.6 CONTROLLER
A. The exact location of the controller shall be approved by the Landscape Architect or City's authorized representative before installation. The electrical service shall be coordinated with this location.

B. The Irrigation Contractor shall be responsible for the final electrical hook up to the irrigation controller.

C. The irrigation system shall be programmed to operate during the periods of minimal use of the design area.

3.7 CONTROL WIRING
A. Low voltage control wiring shall occupy the same trench and shall be installed along the same route as the pressure supply lines whenever possible.

B. Where more than one wire is placed in a trench, the wiring shall be taped together in a bundle at intervals of 10 feet. Bundle shall be secured to the mainline with tape at intervals of 20 feet.

C. All connections shall be of an approved type and shall occur in a valve box. Provide an 18 -inch service loop at each connection.

D. An expansion loop of 12 inches shall be provided at each wire connection and/or directional change, and one of 24 inches shall be provided at each remote control valve.

E. A continuous run of wire shall be used between a controller and each remote control valve. Under no circumstances shall splices be used without prior approval.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-16

Page 2293 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3.8 VALVES
A. Automatic control valves, quick coupler, and ball valves are to be installed in the approximate locations indicated on the drawings.

B. Valve shall be installed in shrub areas whenever possible.

C. Install all valves as indicated in the detail drawings.

D. Valves to be installed in valve boxes shall be installed one valve per box.

E. Provide valve ID tags for each remote control valve with valve number.

3.9 VALVE BOXES
A. Valve boxes shall be installed in shrub areas whenever possible.

B. Each valve box shall be installed on a foundation of 3/4 inch gravel backfill, 3 cubic feet minimum. Valve boxes shall be installed with their tops 1/2 inch above the surface of surrounding finish grade in lawn areas and 2 inches above finish grade in ground cover areas.

3.10 IRRIGATION HEADS, DRIP EMITTERS, AND INLINE DRIP TUBING A. Irrigation heads, drip emitters, and inline drip tubing shall be installed as indicated on the drawings.

B. Spacing of heads and inline drip tubing shall not exceed maximum indicated on the drawings.

C. Riser nipples shall be of the same size as the riser opening in the sprinkler body.

3.11 BACKFLOW PREVENTION UNITS
A. Backflow Prevention Units shall be installed as indicated on the drawings. The backflow prevention unit shall be installed in accordance with the requirements set forth by local codes.

B. The exact location of the backflow device shall be approved by the Landscape Architect or City's authorized representative before installation.

C. The contractor shall be responsible for the testing and certification of the backflow device for proper operation. Testing and certification shall be performed by a state qualified backflow tester.

3.12 MISCELLANEOUS EQUIPMENT
A. Install all assemblies specified herein according to the respective detail drawings or specifications, using best standard practices.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-17

Page 2294 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Quick coupler valves shall be set approximately 18 inches from walks, curbs, header boards, or paved areas where applicable.

C. Install devices such as rain sensors, freeze sensors, flush valves, master valves, and flow sensors as indicated on the drawings and as recommended by the manufacturer.

3.13 FLUSHING THE SYSTEM
A. Prior to installation of irrigation heads, the valves shall be opened and a full head of water used to flush out the lines and risers.

B. Irrigation heads shall be installed after flushing the system has been completed.

3.14 ADJUSTING THE SYSTEM
A. Contractor shall adjust valves, align heads, and check the coverage of each system prior to coverage test.

B. If it is determined by the Landscape Architect or City's authorized representative that additional adjustments or nozzle changes will be required to provide proper coverage, all necessary changes or adjustments shall be made prior to any planting.

C. The entire system shall be operating properly before any planting operations commence.

D. Automatic control valves are to be adjusted so that the irrigation heads, drip emitters and inline drip tubing operate at the pressure recommended by the manufacturer.

3.15 TESTING AND OBSERVATION
A. Do not allow or cause any of the work of this section to be covered up or enclosed until it has been observed, tested and accepted by the Landscape Architect, City, and governing agencies.

B. The Contractor shall be solely responsible for notifying the Landscape Architect, City, and governing agencies, a minimum of 48 hours in advance, where and when the work is ready for testing.

C. When the sprinkler system is completed, the Contractor shall perform a coverage test of each system in its entirety to determine if the water coverage for the planted areas is complete and adequate in the presence of the Landscape Architect.

D. The Contractor shall furnish all materials and perform all work required to correct any inadequacies of coverage due to deviations from the plans, or where the system has been willfully installed as indicated on the drawings when it is obviously inadequate, without bringing this to the attention of the Landscape Architect. This test shall be accepted by the Landscape Architect and accomplished before starting any planting.

E. Areas to be maintained for the formal maintenance period shall start maintenance at the same time, as directed by the Landscape Architect, City, and governing agencies.

LANDSCAPE IRRIGATION DOCUMENT 32 84 00-18

Page 2295 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
Partial areas will not be released into maintenance prior to completion of items listed in the pre -maintenance review. The maintenance period may not be phased.

F. If, after the maintenance review, the irrigation systems are not accepted by the Landscape Architect, the contractor shall reimburse the Architect for additional site visits, or additional time required to review work. All additional time will be billed at the Architect's hourly rate and will be paid for by the contractor at no additional cost to the City.

G. Final inspection will not commence without record drawings as prepared by the Irrigation Contractor.

3.16 MAINTENANCE
During the maintenance period the Contractor shall adjust and maintain the irrigation system in a fully operational condition providing complete irrigation coverage to all intended plantings.

3.17 COMPLETION CLEANING
Clean up shall be made as each portion of the work progresses. Refuse and excess dirt shall be removed from the site, all walks and paving shall be swept, and any damage sustained on the work of others shall be repaired to original conditions.

END OF SECTION 32 84 00
LANDSCAPE IRRIGATION DOCUMENT 32 84 00-19

Page 2296 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
LANDSCAPE IRRIGATION DOCUMENT 32 84 00-20

Page 2297 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 91 13

SOIL PREPARATION
PART 1 GENERAL

1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY
A. Section includes:
(1) Planting soils specified by composition of the mixes. (2) Inorganic soil amendments
(3) Organic soil amendments/Compost
(4) Fertilizers
(5) Pesticides
B. Related Sections:
(1) Document 31 00 00 "Earthwork"
(2) Document 31 10 00 "Site Clearing"
(3) Document 32 84 00 "Irrigation"
(4) Document 32 93 00 "Plants"

1.03 ALLOWANCES
A. Preconstruction and field quality -control testing are part of testing and inspecting allowance.

1.04 DEFINITIONS
A. AAPFCO: Association of American Plant Food Control Officials.

B. Backfill: The earth used to replace or the act of replacing earth in an excavation.

This can be amended or unamended soil as indicated.

C. CCQC: California Compost Quality Council, verifies that compost producers are in compliance with state compost regulations and standards. www.crra.com SOIL PREPARATION DOCUMENT 32 91 13-1

Page 2298 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
D. CEC: Cation exchange capacity.

E. Compost: The product resulting from the controlled biological decomposition of organic material that has been sanitized through the generation of heat and stabilized to the point that it is beneficial to plant growth.

F. Duff Layer: A surface layer of soil, typical of forested areas, that is composed of mostly decayed leaves, twigs, and detritus.

G. Imported Soil: Soil that is transported to Project site for use.

H. Layered Soil Assembly: A designed series of planting soils, layered on each other, that together produce an environment for plant growth.

Manufactured Soil: Soil produced by blending soils, sand, stabilized organic soil amendments, and other materials to produce planting soil.

J. NAPT: North American Proficiency Testing Program. An SSSA program to assist soil-, plant-, and water -testing laboratories through interlaboratory sample exchanges and statistical evaluation of analytical data.

K. Organic Matter: The total of organic materials in soil exclusive of undecayed plant and animal tissues, their partial decomposition products, and the soil biomass; also called "humus" or "soil organic matter."
L. Planting Soil: Existing, on -site soil; imported soil; or manufactured soil that has been modified as specified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

M. RCRA Metals: Hazardous metals identified by the EPA under the Resource Conservation and Recovery Act.

N. SSSA: Soil Science Society of America.

O. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.

P. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

Q. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil"; but in disturbed areas such as urban environments, the surface soil can be subsoil.

R. USCC: U.S. Composting Council.

1.05 PREINSTALLATION MEETINGS
A. Pre -installation Conference: Conduct conference at Project site.

SOIL PREPARATION DOCUMENT 32 91 13-2

Page 2299 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT

1.06 ACTION SUBMITTALS
A. Product Data: For each type of product.
(1) Include recommendations for application and use.
(2) Include test data substantiating that products comply with requirements. (3) Material Certificates: For each type of imported soil, soil amendment and fertilizer before delivery to the site, according to the following:
(a) Manufacturer's qualified testing agency's certified analysis of standard products.
(b) Analysis of fertilizers, by a qualified testing agency, made according to AAPFCO methods for testing and labeling and according to AAPFCO's SUIP #25.
(c) Analysis of nonstandard materials, by a qualified testing agency, made according to SSSA methods, where applicable.

B. Samples: For each bulk -supplied material, 1 -quart volume of each in sealed containers labeled with content, source, and date obtained. Each Sample shall be typical of the lot of material to be furnished.
(1) Provide an accurate representation of composition, color, and texture. (a) Native site soil
(b) Import topsoil
(c) Organic soil amendments

1.07 INFORMATIONAL SUBMITTALS
A. Qualification Data: For each testing agency.

B. Preconstruction Test Reports: For preconstruction soil analyses specified in "Preconstruction Testing" Article.

C. Field quality -control reports.

1.08 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent, state -operated, or university - operated laboratory; experienced in soil science, soil testing, and plant nutrition; with the experience and capability to conduct the testing indicated; and that specializes in types of tests to be performed.
(1) Laboratories: Subject to compliance with requirements, provide testing by the following:

SOIL PREPARATION DOCUMENT 32 91 13-3

Page 2300 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
(a) Soil testing: Wallace Laboratories, Inc, El Segundo (310) 615- 0116
(b) For compost testing: Soil Control Lab, Watsonville (831) 761- 7273
Laboratory soil testing report shall be no older than 6 months from the date of Landscape Architect's review and shall represent the product delivered to the project site.

Laboratory compost testing report shall be no older than 3 months from the date of Landscape Architect's review and shall represent the product delivered to the project site.

B. Standard Specifications:
(1) Quality of compost shall comply with OMRI, CCQC and STA standards. (2) In the event that standards conflict, the most restrictive standard shall be followed.

1.09 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction soil analyses on imported soil.

B. Preconstruction Soil Analyses: For each unamended soil type, perform testing on soil samples and furnish soil analysis and a written report containing soil - amendment and fertilizer recommendations by a qualified testing agency performing the testing according to "Soil -Sampling Requirements" and "Testing Requirements" articles.
(1) Have testing agency identify and label samples and test reports according to sample collection and labeling requirements.
(2) Soil test report to include recommendations for amendments with organic materials. Recommendations for synthetic amendments will not be accepted.

1.10 SOIL -SAMPLING REQUIREMENTS
A. Sample Collection and Labeling: Have samples taken and labeled by Contractor per the direction of the testing agency.
(1) Number and Location of Samples: Three representative soil samples from varied locations as directed by Landscape Architect for each soil to be used or amended for landscaping purposes.
(2) Procedures and Depth of Samples: Per soil testing laboratory standards. (3) Labeling: Label each sample with the date, location keyed to a site plan or other location system, visible soil condition, and sampling depth.

SOIL PREPARATION DOCUMENT 32 91 13-4

Page 2301 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT

1.11 TESTING REQUIREMENTS
A. General: Perform tests on soil samples according to requirements in this article.

B. Physical Testing:
(1) Soil Texture: Soil -particle, size -distribution analysis by one of the following methods according to SSSA's "Methods of Soil Analysis - Part 1- Physical and Mineralogical Methods":
(a) Sieving Method: Report sand -gradation percentages for very coarse, coarse, medium, fine, and very fine sand; and fragment - gradation (gravel) percentages for fine, medium, and coarse fragments; according to USDA sand and fragment sizes.
(b) Hydrometer Method: Report percentages of sand, silt, and clay. (2) Total Porosity: Calculate using particle density and bulk density according to SSSA's "Methods of Soil Analysis - Part 1 -Physical and Mineralogical Methods."
(3)
Water Retention: According to SSSA's "Methods of Soil Analysis - Part 1 - Physical and Mineralogical Methods."
(4) Saturated Hydraulic Conductivity: According to SSSA's "Methods of Soil Analysis - Part 1 -Physical and Mineralogical Methods"; at 85% compaction according to ASTM D 698 (Standard Proctor).

C. Chemical Testing:
(1) CEC: Analysis by sodium saturation at pH 7 according to SSSA's "Methods of Soil Analysis - Part 3- Chemical Methods."
(2) Clay Mineralogy: Analysis and estimated percentage of expandable clay minerals using CEC by ammonium saturation at pH 7 according to SSSA's "Methods of Soil Analysis - Part 1- Physical and Mineralogical Methods."
(3)
Metals Hazardous to Human Health: Test for presence and quantities of RCRA metals including aluminum, arsenic, barium, copper, cadmium, chromium, cobalt, lead, lithium, and vanadium. If RCRA metals are present, include recommendations for corrective action. (4) Phytotoxicity: Test for plant -available concentrations of phytotoxic minerals including aluminum, arsenic, barium, cadmium, chlorides, chromium, cobalt, copper, lead, lithium, mercury, nickel, selenium, silver, sodium, strontium, tin, titanium, vanadium, and zinc.

D. Fertility Testing: Soil -fertility analysis according to standard laboratory protocol, including the following:

SOIL PREPARATION DOCUMENT 32 91 13-5

Page 2302 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Percentage of organic matter.
(2) CEC, calcium percent of CEC, and magnesium percent of CEC. (3) Soil reaction (acidity/alkalinity pH value).
(4) Buffered acidity or alkalinity.
(5) Nitrogen ppm.
(6) Phosphorous ppm.
(7) Potassium ppm.
(8) Manganese ppm.
(9) Manganese -availability ppm.
(10) Zinc ppm.
(11) Zinc availability ppm.
(12) Copper ppm.
(13) Sodium ppm and sodium absorption ratio.
(14) Soluble -salts ppm.
(15) Presence and quantities of problem materials including salts and metals cited in the Standard protocol. If such problem materials are present, provide additional recommendations for corrective action. (16) Other deleterious materials, including their characteristics and content of each.

E. Organic -Matter Content: Analysis using loss -by -ignition method according to SSSA's "Methods of Soil Analysis - Part 3- Chemical Methods." F. Recommendations: Based on the test results, state recommendations for soil treatments and soil amendments to be incorporated to produce satisfactory planting soil suitable for healthy, viable plants indicated. Include, at a minimum, recommendations for nitrogen, phosphorous, and potassium fertilization, and for micronutrients. Request recommendations for organic amendments and compost only; synthetic amendments and fertilizers will not be accepted. (1) Fertilizers and Soil Amendment Rates: State recommendations in weight per 1000 sq. ft. for 6 -inch depth of soil.

SOIL PREPARATION DOCUMENT 32 91 13-6

Page 2303 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT

1.12 DELIVERY, STORAGE, AND HANDLING
A. Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and compliance with state and Federal laws if applicable.

B. Bulk Materials:
(1) Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants.
(2) Provide erosion -control measures to prevent erosion or displacement of bulk materials, discharge of soil -bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways. (3) Do not move or handle materials when they are wet or frozen. (4) Accompany each delivery of bulk fertilizers and soil amendments with appropriate certificates.

PART 2 PRODUCTS

2.01 MATERIALS
A. Regional Materials: Imported topsoil, soil amendments and fertilizers shall be sourced within 500 miles of Project site from materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles of Project site.

2.02 PLANTING SOILS SPECIFIED BY COMPOSITION
A. General: Soil amendments, fertilizers, and rates of application specified in this article are guidelines that may need revision based on testing laboratory's recommendations after preconstruction soil analyses are performed.

B. Planting -Soil Type: Existing, on -site surface soil, with the duff layer, if any, retained and stockpiled on -site; modified to produce viable planting soil. Blend existing, on -site surface soil with organic soil amendments recommended by soils testing laboratory.

C. Planting -Soil Type: Imported, suitable topsoil from off -site sources, tested and amended, per soil testing laboratory recommendations, to produce viable planting soil.
(1) Unacceptable Properties: Clean soil of the following:
(a) Unacceptable Materials: Concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials that are harmful to plant growth.

SOIL PREPARATION DOCUMENT 32 91 13-7

Page 2304 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
(b) Unsuitable Materials: Stones, roots, plants, sod, clay lumps, and pockets of coarse sand that exceed a combined maximum of 8 percent by dry weight of the imported soil.
(c) Large Materials: Stones, clods, roots, clay lumps, and pockets of coarse sand exceeding 3 inches in any dimension.
(2) Amended Soil Composition: Blend imported, unamended soil with the soil amendments and fertilizers recommended in Soil Testing Report.

2.03 INORGANIC SOIL AMENDMENTS
A. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows:
(1) Class: O, with a minimum of 95 percent passing through a No. 8 sieve and a minimum of 55 percent passing through a No. 60 sieve. (2) Provide lime in form of ground dolomitic limestone.

B. Sulfur: Granular, biodegradable, and containing a minimum of 90 percent elemental sulfur, with a minimum of 99 percent passing through a No. 6 sieve and a maximum of 10 percent passing through a No. 40 sieve.

C. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

D. Perlite: Horticultural perlite, soil amendment grade.

E. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through a No. 50 sieve.

F. Sand: Clean, washed, natural or manufactured, free of toxic materials, according to ASTM C 33.

2.04 ORGANIC SOIL AMENDMENTS
A. Compost: Well -composted, stable, and weed -free organic matter produced by composting feedstock, and bearing USCC's "Seal of Testing Assurance," and as follows:

Parameters
Units of measure
General Range
Nitrogen (Total N)
% dry weight
>0.9
Ammonium (N or NH4-N)
ppm or mg/kg dry weight
10 Phosphorus (P)
% dry weight
<0.6
Calcium (Ca)
% dry weight
<3.5
Boron (Total B)
ppm or mg/kg dry weight
<80

SOIL PREPARATION

Page 2305 of 3058 ends

DOCUMENT 32 91 13-8

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
Sodium (Na)
Total Nitrogen Phosphorus and
Potassium (NPK)
Carbon Nitrogen Ratio
Organic Matter Content
pH
Moisture Content
Particle Size or Sieve Size
Stability Indicator: Carbon Dioxide (C02)
Evolution Rate
% dry weight
Sum % dry weight
Carbon: Nitrogen
% by dry weight basis
pH units
% wet weight basis
% under 1/2" or 25mm by dry
weight
Mg CO2-C/g OM per day

2.0 ≤25:1
>35

6.5-8.5
>35
>95%
80%
>80%
19 and 500 and
<1100
(1) Contaminants: Compost shall be free of contaminants such as glass, metal, and visible plastic, heavy metals, fecal coliform and salmonella species not exceeding levels per California Integrated Waste Management regulations.
(2)
(3)
(4)
Color: Dark brown to black
Acceptable odor: soil -like, musty or moldy.

Unacceptable odor: sour, ammonia, putrid

SOIL PREPARATION

Page 2306 of 3058 ends

DOCUMENT 32 91 13-9

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
(5)
Particle characteristics: identifiable wood pieces are acceptable but the balance of material should be soil -like without recognizable grass or leaves.

B. Sphagnum Peat: Partially decomposed sphagnum peat moss, finely divided or of granular texture with 100 percent passing through a 1/2 -inch sieve, a pH of 3.4 to

4.8, and a soluble -salt content measured by electrical conductivity of maximum 5 dS/m.

C. Muck Peat: Partially decomposed moss peat, native peat, or reed -sedge peat, finely divided or of granular texture with 100 percent passing through a 1/2 -inch sieve, a pH of 6 to 7.5, a soluble -salt content measured by electrical conductivity of maximum 5 dS/m, having a water -absorbing capacity of 1100 to 2000 percent, and containing no sand.

D. Wood Derivatives: Shredded and composted, ground bark, or wood waste; of uniform texture and free of chips, stones, sticks, soil, or toxic materials.

E. Partially Decomposed Wood Derivatives: In lieu of shredded and composted wood derivatives, mix shredded and partially decomposed wood derivatives with ammonium nitrate at a minimum rate of 0.15 lb/cu. ft. of ground bark, or with ammonium sulfate at a minimum rate of 0.25 lb/cu. ft. of loose sawdust or ground bark.

F. Manure: Well -rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, debris, and material harmful to plant growth.

G. Compost shall not contain mixed solid waste, or substances toxic to plants.

Compost shall not resemble the original material from which it was derived, nor have objectionable odors.

2.05 FERTILIZERS
A. Non -synthetic fertilizers as recommended by the soils report. (1) Synthetic, quick -release fertilizers will not be permitted. (2) Fertilizers prohibited in the Generic Materials List by the Organic materials Review Institute (OMRI) are prohibited in the project.

2.06 PESTICIDES
A. General: Pesticide registered and approved by the EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application.

B. Do not use any pesticides unless authorized in writing by Landscape Architect and authorities having jurisdiction prior to application.

SOIL PREPARATION DOCUMENT 32 91 13-10

Page 2307 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Pre -Emergent Herbicide (Selective and Nonselective): Effective for controlling the germination or growth of weeds within planted areas at the soil level directly below the mulch layer.

D. Post -Emergent Herbicide (Selective): Effective for controlling weed growth that has already germinated.

E. Contractor to obtain written approval from Landscape Architect prior to application of pre -emergent and post -emergent herbicides. The following least toxic products may be employed:
(1) Fatty acid potassium salts (herbicidal soaps e.g. Safer's Superfast Weed and Grass Killer® Dr. Bronner's Peppermint Anti -Bacterial Soap.) (2) Acetic and citric acids (Nature's Glory Weed and Grass Killer RTU®) (3) Clove,citrus, mint and thyme oil (Matran II®, Xpress®) (4) Corn gluten
(5) Low -toxic, low -residual herbicide (Glyphosate (Round -up®), glufosinate- ammonium (Finale®), pelargoic acid (Scythe®))
F. Do not use the following products:
(1) Atrazine (Aatrex)
(2) Simazine (Princep)
(3) Bromacil (Hyvar, Krovar)
(4) Prometon (Pramitol)
(5) Bentazon (Basagran)
(6) Norflurazon (Solicam, Predict, Zorial)
(7) Picloram
(8) Clopyralid
PART 3 EXECUTION

3.01 GENERAL
A. Place planting soil and fertilizers according to requirements in other Specification Sections.

B. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in planting soil.

SOIL PREPARATION DOCUMENT 32 91 13-11

Page 2308 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Proceed with placement only after unsatisfactory conditions have been corrected.

3.02 PREPARATION OF UNAMENDED, ON -SITE SOIL BEFORE AMENDING A. Excavation: Excavate soil from designated area(s) to a depth 6 inches deeper than size of tree root ball, and stockpile until amended. Refer to Document 31 00 00 "Earthwork."
B. Unacceptable Materials: Clean soil shall not contain any percentage of concrete slurry, concrete layers or chunks, cement, plaster, building debris, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, acid, and other extraneous materials that are harmful to plant growth.

C. Unsuitable Materials: Clean soil to contain a maximum of 8 percent by dry weight of stones, roots, plants, sod, clay lumps, and pockets of coarse sand.

D. Remove stones larger than 2 inches in any dimension and sticks, roots, rubbish and other extraneous materials, and legally dispose of them off District's property.

3.03 PLACING AND MIXING PLANTING SOIL OVER EXPOSED SUBGRADE A. General: Apply and mix unamended soil with amendments on -site to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Subgrade Preparation: Till subgrade to a minimum depth of 6 inches where site conditions permit. Remove stones 4 inches and larger in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off District's property.
(1) Apply, add soil amendments, and mix approximately half the thickness of unamended soil over prepared, loosened subgrade according to "Mixing" Paragraph below. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil.

C. Mixing: Spread unamended soil to total depth of 6 inches, but not less than required to meet finish grades after mixing with amendments and natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.
(1) Amendments: Apply soil amendments, compost and organic fertilizer, if required, evenly on surface, and thoroughly blend them with unamended soil to produce planting soil.
(a) Mix lime and sulfur with dry soil before mixing fertilizer. (b) Mix fertilizer with planting soil no more than seven days before planting.

SOIL PREPARATION DOCUMENT 32 91 13-12

Page 2309 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Lifts: Apply and mix unamended soil and amendments in lifts not exceeding 12 inches in loose depth for material compacted by compaction equipment, and not more than 6 inches in loose depth for material compacted by hand -operated tampers.
(3) Compaction: Compact each blended lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698 and tested in -place.
(4) Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.04 PLACING MANUFACTURED PLANTING SOIL OVER EXPOSED SUBGRADE A. General: Apply manufactured soil on -site in its final, blended condition. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Subgrade Preparation: Till subgrade to a minimum depth of 8 inches where site conditions allow. Remove stones 4 inches or larger in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off District's property.

C. Apply approximately half the thickness of planting soil over prepared, loosened subgrade. Mix thoroughly into top 4 inches of subgrade. Spread remainder of planting soil.

D. Spread planting soil to total depth of 12 inches, but not less than required to meet finish grades after natural settlement. Do not spread if soil or subgrade is frozen, muddy, or excessively wet.
(1) Lifts: Apply planting soil in lifts not exceeding 6 inches in loose depth.

E. Compaction: Compact each lift of planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698.

F. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.05 BLENDING PLANTING SOIL IN PLACE
A. General: Mix amendments with in -place, unamended soil to produce required planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Preparation: Till unamended, existing soil in planting areas to a minimum depth of 6 inches where site conditions permit. Remove stones 4 inches and larger in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off District's property.

SOIL PREPARATION DOCUMENT 32 91 13-13

Page 2310 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Mixing: Apply soil amendments, compost and organic fertilizer, if required, evenly on surface, and thoroughly blend them into full depth of unamended, in -place soil to produce planting soil.
(1) Mix lime and sulfur with dry soil before mixing fertilizer. (2) Mix fertilizer with planting soil no more than seven days before planting.

D. Compaction: Compact blended planting soil to 75 to 82 percent of maximum Standard Proctor density according to ASTM D 698.

E. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.06 APPLYING COMPOST TO SURFACE OF PLANTING SOIL
A. Application: Apply 1 inch of compost to surface of in -place planting soil. Do not apply materials or till if existing soil or subgrade is frozen, muddy, or excessively wet.

B. Finish Grading: Grade surface to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.07 PESTICIDE APPLICATION
A. Apply pesticides and other chemical products and biological control agents according to authorities having jurisdiction and manufacturer's written recommendations. Coordinate applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed.

B. Pre -Emergent Herbicides (Selective and Nonselective): Apply to tree, shrub, and ground -cover areas according to manufacturer's written recommendations, and only during the appropriate times in plants' life cycle. Do not apply to seeded areas.

C. Post -Emergent Herbicides (Selective): Apply only as necessary to treat already - germinated weeds and according to manufacturer's written recommendations and only during the appropriate times in plants' life cycle.

3.08 FIELD QUALITY CONTROL
A. Drainage test: See Document 32 93 00 "Planting" for drainage test at tree wells.

3.09 PROTECTION
A. Protect areas of in -place soil from compaction, disturbance, and contamination.

Prohibit the following practices within these areas except as required to perform planting operations:
(1) Storage of construction materials, debris, or excavated material.

SOIL PREPARATION DOCUMENT 32 91 13-14

Page 2311 of 3058 ends

SPORTS PARK FIELD LIGHING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Parking vehicles or equipment.
(3) Vehicle and foot traffic.
(4) Impoundment of water.
(5) Excavation or other digging unless otherwise indicated.

B. If planting soil or subgrade is overcompacted, disturbed, or contaminated by foreign or deleterious materials or liquids, remove the planting soil and contamination; restore the subgrade as directed by Landscape Architect and replace contaminated planting soil with new planting soil.

3.10 CLEANING
A. Protect areas adjacent to planting -soil preparation and placement areas from contamination. Keep adjacent paving and construction clean and work area in an orderly condition.

B. Remove surplus soil and waste material including excess subsoil, unsuitable materials, trash, and debris and legally dispose of them off District's property unless otherwise indicated.

END OF DOCUMENT 32 91 13
SOIL PREPARATION DOCUMENT 32 91 13-15

Page 2312 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 91 14

BIORETENTION SOILS
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. Specifications for furnishing, placing, and compacting bioretention soils as indicated.

B. Related Sections:
• 31 20 00 Earthwork
• 32 40 00 Storm Drainage System

1.02 SUBMITTALS
The contractor shall submit to the Engineer for approval:

A. A sample of mixed bioretention soil.

B. Certification from the soil supplier or an accredited laboratory that the Bioretention Soil meets the requirements of this guideline specification.

C. Grain size analysis results of the fine sand component performed in accordance with ASTM D 422, Standard Test Method for Particle Size Analysis of Soils.

D. Quality analysis results for compost performed in accordance with Seal of Testing Assurance (STA) standards, as specified in Section 1.4.

E. Organic content test results of mixed Bioretention Soil. Organic content test shall be performed in accordance with by Testing Methods for the Examination of Compost and Composting (TMECC) 05.07A, "Loss -On -Ignition Organic Matter Method".

F. A description of the equipment and methods used to mix the sand and compost to produce Bioretention Soil.

G. Provide the following information about the testing laboratory(ies) name of laboratory(ies) including:

1. Contact person(s)
a. Address(es)
b. Phone contact(s)
c. E-mail address(es)
d. Qualifications of laboratory(ies), and personnel including date of current certification by STA, ASTM, or approved equal
BIORETENTION SOILS 32 91 14 - 1

Page 2313 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
PART 2 - PRODUCTS

2.01 SAND FOR BIORETENTION SOIL
A. General

1. Sand shall be free of wood, waste, coating such as clay, stone dust, carbonate, etc., or any other deleterious material. All aggregate passing the No. 200 sieve size shall be non -plastic.

B. Sand for Bioretention Soil Texture.

1. Sand for Bioretention Soils shall be analyzed by an accredited lab using #200, #100, #40, #30, #16, #8, #4, and 3/8 inch sieves (ASTM D 422 or as approved by the Engineer), and meet the following gradation:

Sieve Size Percentage Passing (by weight)
Min Max
3/8lnch 100 100
No. 4 90 100
No. 8 70 100
No. 16 40 95
No. 30 15 70
No.40 5 55
No. 100 0 15
No.200 0 5
Note all sands complying with ASTM C33 for fine aggregate comply with the above gradation requirements.

2.02 TOPSOIL FOR BIORETENTION SOIL
A. General: Topsoil shall be free of wood, waste, or any other deleterious material.

B. Topsoil for Bioretention Soil Texture: The overall topsoil texture shall be loamy sand as analyzed by an accredited laboratory. The overall dry weight percentages shall be 60-90% sand, with less than 20% passing than the #200 sieve and less than 5% clay of the total weight with no gravel.

2.03 COMPOSTED MATERIAL
A. Compost shall be a well decomposed, stable, weed free organic matter source meeting the standards developed by the US Composting Council (USCC). The product shall be certified through the USCC Seal of Testing Assurance (STA) Program (a compost testing and information disclosure program).

B. Compost Quality Analysis Before delivery of the soil, the Contractor shall submit a copy of lab analysis performed by a laboratory that is enrolled in the US Composting Council's Compost Analysis Proficiency (CAP) program and using approved Test Methods for the Evaluation of Composting and Compost (TMECC). The lab report shall verify:

BIORETENTION SOILS 32 91 14 - 2

Page 2314 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

1. Feedstock Materials shall be specified and include one or more of the following:
landscape/yard trimmings, grass clippings, food scraps, and agricultural crop residues.

2. Organic Matter Content: 35% - 75% by dry wt.

3. Carbon and Nitrogen Ratio: C:N 5 Index value

5. Toxicity: any one of the following measures is sufficient to indicate non -toxicity. a. NH4- : NO3-N 80 % of control
d. Plant Trials > 80% of control
e. Solvita® > 5 Index value

6. Nutrient Content: provide analysis detailing nutrient content including N -P -K, Ca, Na, Mg, S, and B.
a. Total Nitrogen content 0.9% or above preferred.
b. Boron: Total shall be <80 ppm; Soluble shall be <2.5 ppm

7. Salinity: Must be reported; < 6.0 mmhos/cm

8. pH shall be between 6.5 and 8. May vary with plant species.

C. Particle size: 95% passing a 1/2" screen.

D. Bulk density: shall be between 500 and 1100 dry Ibs/cubic yard E. Moisture Content shall be between 30% - 55% of dry solids F. Inerts: compost shall be relatively free of inert ingredients, including glass, plastic and paper, < 1 % by weight or volume
G. Weed seed/pathogen destruction: provide proof of process to further reduce pathogens (PFRP). For example, turned windrows must reach min. 55C for 15 days with at least 5 turnings during that period.

H. Select Pathogens: Salmonella <3 MPN/4grams of TS, or Coliform Bacteria <10000 MPN/gram
I. Trace Contaminants Metals (Lead, Mercury, Etc.) Product must meet US EPA, 40 CFR 503 regulations
J. Compost Testing. The Contractor will test all compost products within 120 calendar days prior to application. Samples will be taken using the STA sample collection protocol. (The BIORETENTION SOILS 32 91 14 - 3

Page 2315 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
sample collection protocol can be obtained from the U.S. Composting Council, 4250 Veterans Memorial Highway, Suite 275, Holbrook, NY 11741 Phone: 631-737-4931, www.compostingcouncil.org) . The sample shall be sent to an independent STA Program approved lab. The Contractor will pay for the test.

PART 3 - EXECUTION

3.01 PLACEMENT AND COMPACTION OF BIORETENTION SOILS
A. Place the bioretention soil in 8" to 12" lifts. Lifts are not to be compacted but are placed to reduce the possibility of excessive settlement. Allow time for natural compaction and settlement prior to planting. Bioretention soil may be watered to encourage compaction.

END OF SECTION 32 91 14
BIORETENTION SOILS 32 91 14 - 4

Page 2316 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 92 00

TURF AND GRASSES
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Seeding.

2. Hydroseeding.

3. Sodding.

1.2 DEFINITIONS
A. Finish Grade: Elevation of finished surface of planting soil.

B. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. Pesticides include insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. They also include substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

C. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. Pests include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses.

D. Planting Soil: Existing, on -site soil; imported soil; or manufactured soil that has been modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth. See Section 32 91 13 "Soil Preparation and drawing designations for planting soils.

E. Subgrade: The surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed.

1.3 INFORMATIONAL SUBMITTALS
A. Qualification Data: For landscape Installer.

B. Certification of Grass Seed: From seed vendor for each grass -seed monostand or mixture, stating the botanical and common name, percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging.

1. Certification of each seed mixture for turfgrass sod. Include identification of TURF AND GRASSES 32 92 00-1

Page 2317 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
source and name and telephone number of supplier.

C. Product Certificates: For fertilizers, from manufacturer.

D. Pesticides and Herbicides: Product label and manufacturer's application instructions specific to Project.

1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: Recommended procedures to be established by Owner for maintenance of turf during a calendar year. Submit before expiration of required maintenance periods.

1.5 QUALITY ASSURANCE
A. Installer Qualifications: A qualified landscape installer whose work has resulted in successful turf establishment.

1. Professional Membership: Installer shall be a member in good standing of either the National Association of Landscape Professionals or AmericanHort.

2. Experience: Three years' experience in turf installation.

3. Installer's Field Supervision: Require Installer to maintain an experienced full- time supervisor on Project site when work is in progress.

4. Personnel Certifications: Installer's personnel assigned to the Work shall have certification in one of the following categories from the National Association of Landscape Professionals:
a. Landscape Industry Certified Technician - Exterior.
b. Landscape Industry Certified Lawn Care Manager.
c. Landscape Industry Certified Lawn Care Technician.

5. Pesticide Applicator: State licensed, commercial.

1.6 DELIVERY, STORAGE, AND HANDLING
A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with state and Federal laws, as applicable.

B. Sod: Harvest, deliver, store, and handle sod according to requirements in "Specifications for Turfgrass Sod Materials" and "Specifications for Turfgrass Sod Transplanting and Installation" sections in TPI's "Guideline Specifications to Turfgrass Sodding." Deliver sod within 24 hours of harvesting and in time for planting promptly.

Protect sod from breakage and drying.

C. Bulk Materials:

1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants.

TURF AND GRASSES 32 92 00-2

Page 2318 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2. Provide erosion -control measures to prevent erosion or displacement of bulk materials; discharge of soil -bearing water runoff; and airborne dust reaching adjacent properties, water conveyance systems, or walkways.

3. Accompany each delivery of bulk materials with appropriate certificates.

1.7 FIELD CONDITIONS
A. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions according to manufacturer's written instructions.

PART 2 - PRODUCTS

2.1 SEED
A. Grass Seed: Fresh, clean, dry, new -crop seed complying with AOSA's "Rules for Testing Seeds" for purity and germination tolerances.

B. Seed Species: See Plans

2.2 TURFGRASS SOD
A. Turfgrass Sod: complying with "Specifications for Turfgrass Sod Materials" in TPI's "Guideline Specifications to Turfgrass Sodding." Furnish viable sod of uniform density, color, and texture that is strongly rooted and capable of vigorous growth and development when planted.

B. Turfgrass Species: See Plans

2.3 MULCHES
A. Compost Mulch: Well -composted, stable, and weed -free organic matter, pH range of

5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1 - inch sieve; soluble salt content of 2 to 5 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 60 percent of dry weight.

2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or source -separated or compostable mixed solid waste.

2.4 PESTICIDES
A. General: Pesticide, registered and approved by the EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted TURF AND GRASSES 32 92 00-3

Page 2319 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
pesticides unless authorized in writing by authorities having jurisdiction.

B. Pre -Emergent Herbicide (Selective and Nonselective): Effective for controlling the germination or growth of weeds within planted areas at the soil level directly below the mulch layer.

C. Post -Emergent Herbicide (Selective and Nonselective): Effective for controlling weed growth that has already germinated.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas to be planted for compliance with requirements and other conditions affecting installation and performance of the Work.

1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area.

2. Suspend planting operations during periods of excessive soil moisture until the moisture content reaches acceptable levels to attain the required results.

3. Uniformly moisten excessively dry soil that is not workable or which is dusty.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

C. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove the soil and contamination as directed by Architect and replace with new planting soil.

3.2 PREPARATION
A. Protect structures; utilities; sidewalks; pavements; and other facilities, trees, shrubs, and plantings from damage caused by planting operations.

1. Protect adjacent and adjoining areas from hydroseeding and hydromulching overspray.

2. Protect grade stakes set by others until directed to remove them.

B. Install erosion -control measures to prevent erosion or displacement of soils and discharge of soil -bearing water runoff or airborne dust to adjacent properties and walkways.

3.3 TURF AREA PREPARATION
A. General: Prepare planting area for soil placement and mix planting soil according to Section 329113 "Soil Preparation.

TURF AND GRASSES 32 92 00-4

Page 2320 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

C. Before planting, obtain Engineer's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

3.4 HYDROSEEDING
A. Hydroseeding: Mix specified seed, and fiber mulch in water, using equipment specifically designed for hydroseed application. Continue mixing until uniformly blended into homogeneous slurry suitable for hydraulic application.

1. Mix slurry with fiber -mulch manufacturer's recommended tackifier.

2. Spray -apply slurry uniformly to all areas to be seeded in a one-step process.

Apply slurry at a rate so that mulch component is deposited at not less than 1500-lb/acre dry weight, and seed component is deposited at not less than the specified seed -sowing rate.

3. Spray -apply slurry uniformly to all areas to be seeded in a two-step process.

Apply first slurry coat at a rate so that mulch component is deposited at not less than 500-lb/acre dry weight, and seed component is deposited at not less than the specified seed -sowing rate. Apply slurry cover coat of fiber mulch (hydromulching) at a rate of 1000 lb/acre.

3.5 SODDING
A. Lay sod within 24 hours of harvesting. Do not lay sod if dormant or if ground is frozen or muddy.

B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch or overlap. Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to soil or sod during installation. Tamp and roll lightly to ensure contact with soil, eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass.

1. Lay sod across slopes exceeding 1:3.

2. Anchor sod on slopes exceeding 1:6 with wood pegs or steel staples spaced as recommended by sod manufacturer but not less than two anchors per sod strip to prevent slippage.

C. Saturate sod with fine water spray within two hours of planting. During first week after planting, water daily or more frequently as necessary to maintain moist soil to a minimum depth of 1-1/2 inches below sod.

3.6 TURF MAINTENANCE
A. General: Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, TURF AND GRASSES 32 92 00-5

Page 2321 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf. Provide materials and installation the same as those used in the original installation.

1. Fill in as necessary soil subsidence that may occur because of settling or other processes. Replace materials and turf damaged or lost in areas of subsidence.

2. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch and anchor as required to prevent displacement.

3. Apply treatments as required to keep turf and soil free of pests and pathogens or disease. Use integrated pest management practices whenever possible to minimize the use of pesticides and reduce hazards.

B. Watering: Install and maintain temporary piping, hoses, and turf -watering equipment to convey water from sources and to keep turf uniformly moist to a depth of 4 inches.

1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

2. Water turf with fine spray at a minimum rate of 1 inch per week unless rainfall precipitation is adequate.

C. Mow turf as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than one-third of grass height. Remove no more than one-third of grass -leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowings to maintain the following grass height:

D. Turf Postfertilization: Apply slow -release fertilizer after initial mowing and when grass is dry.

1. Use fertilizer that provides actual nitrogen of at least 1 lb/1000 sq. ft. to turf area.

3.7 SATISFACTORY TURF
A. Turf installations shall meet the following criteria as determined by Architect:

1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.

2. Satisfactory Sodded Turf: At end of maintenance period, a healthy, well -rooted, even -colored, viable turf has been established, free of weeds, open joints, bare areas, and surface irregularities.

3. Satisfactory Sprigged Turf: At end of maintenance period, the required number of sprigs has been established as well -rooted, viable plants, and areas between sprigs are free of weeds and other undesirable vegetation.

B. Use specified materials to reestablish turf that does not comply with requirements, and continue maintenance until turf is satisfactory.

TURF AND GRASSES 32 92 00-6

Page 2322 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3.8 PESTICIDE APPLICATION
A. Apply pesticides and other chemical products and biological control agents according to requirements of authorities having jurisdiction and manufacturer's written recommendations. Coordinate applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed.

B. Post -Emergent Herbicides (Selective and Nonselective): Apply only as necessary to treat already -germinated weeds and according to manufacturer's written recommendations.

3.9 CLEANUP AND PROTECTION
A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.

B. Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of them off Owner's property.

C. Erect temporary fencing or barricades and warning signs as required to protect newly planted areas from traffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings are established.

D. Remove nondegradable erosion -control measures after grass establishment period.

3.10 MAINTENANCE SERVICE
A. Turf Maintenance Service: Provide full maintenance by skilled employees of landscape Installer. Maintain as required in "Turf Maintenance" Article. Begin maintenance immediately after each area is planted and continue until acceptable turf is established, but for not less than the following periods:

1. Hydroseeded Turf: 60 days from date of planting completion. a. When initial maintenance period has not elapsed before end of planting season, or if turf is not fully established, continue maintenance during next planting season.

2. Sodded Turf: 60 days from date of planting completion.

END OF SECTION 32 92 00
TURF AND GRASSES 32 92 00-7

Page 2323 of 3058 ends

SECTION 32 92 10

SYNTHETIC TURF

1.0 GENERAL REQUIREMENTS

1.1 Related Documents
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this section.

1.2 Scope of Work
A. Furnish all labor, materials, tools, and equipment necessary to install, in place, all synthetic turf material as indicated on the plans and as specified herein. The installation of all new materials shall be performed in strict accordance with the Manufacturer's written installation instructions, and in accordance with all approved shop drawings.

B. Prior to order of materials, the Synthetic Turf Contractor shall submit the following:

1. Product data, including Independent Laboratory Test Results,

2. Installation details,

3. Sample Warranty,

4. Field layout and striping plans,

5. Details on construction, especially any details that may deviate from plans and specifications.

C. Prior to the beginning of installation, the Synthetic Turf Contractor of the synthetic turf shall verify the base for planarity. Upon written confirmation from the base contractor that compaction/planarity and drainage/permeability specifications have been achieved, the installation of synthetic turf will proceed as arranged.

D. Prior to Final Acceptance, the Synthetic Turf Contractor shall submit to the Owner three (3) copies of Executed Warranty Documents and Maintenance Manuals, which will include necessary instructions for the proper care and preventative maintenance of the synthetic turf system, including painting and striping.

1.3 Shop Drawings
A. Shop drawings shall be prepared and contain all pertinent information regarding installation. These drawings shall be submitted to the Owner or Owner's representative for approval prior to the manufacturing and shipment of materials. 11012017

Page 2324 of 3058 ends

B. Submit drawings for:

1. Installation details, edge detail, goal post detail, other inserts, and covers, etc., as required by contract.

2. The Synthetic Turf Manufacturer must have been in business under the same ownership for at least five years, and shall have been installing similar sports fields for that entire period.

3. Striping plan showing any field lines, markings and boundaries, and field logos per project drawings.

1.4 Quality Assurance
A. Synthetic Turf Manufacturer is defined as:

1. A company specializing in the design and manufacturing of infilled turf systems with not less than ten (10) years documented experience.

2. The Synthetic Turf Manufacturer must have been in business under the same ownership for at least ten (10) years, and shall have been installing similar sports fields for that entire period.

3. Manufacturer shall have an experienced technical services and sales professional who is available during the course of the work to meet personally with the Owner, Contractor, and Landscape Architect.

B. Synthetic Turf Manufacturer's Experience:

1. The Synthetic Turf Manufacturer shall have the experience of at least one hundred (100) acceptable installations of full-size fields (minimum 65,000 sq. ft.) in the United States within the past twelve (12) months of tufted, polyethylene grass -like fabrics with infill. Submit a list of all applicable installations with the bid.

2. The Synthetic Turf Manufacturer shall have the experience of one hundered (100) acceptable installations (minimum 65,000 sq. ft.) of fields that are at least eight (8) years old. Submit a list of all applicable installations with the bid.

3. The Synthetic Turf Manufacturer shall have the experience of fifty (50) acceptable installations of the specific fiber system specified. Submit a list of all applicable installations with the bid.

4. The Synthetic Turf Manufacturer must be a certified member of the Synthetic Turf Council in good standing.

5. The Synthetic Turf Manufacturer must have and operate its own extensive research and development laboratory. This laboratory must include testing devices for the following tests: Yarn Tensile Strength, Yarn Elongation, Tuft Bind, Grab Tear Strength, Seam Strength, g -max, Force Reduction, Vertical Deformation, Ball Roll, Ball Rebound, Rotational Resistance, Linear Traction, Relative Abrasive Index, UV Resistance, Flammability, and Simulated Aging.
11012017

Page 2325 of 3058 ends

6. Manufacturer must have an ISO 17025 Accredited Laboratory in place at the time of manufacturing to verify product standards and quality.

7. Manufactures without an ISO 17025 Accredited Laboratory will not be accepted.Testing of the synthetic turf system is mandatory and must be provided from a laboratory that is accredited by the NVLAP. Testing from laboratories that are not NVLAP accredited will not be accepted. The National Institute of Standards and Technology (KIST) is part of the U.S.

Department of Commerce and administers the National Voluntary Laboratory Accreditation Program (NVLAP). Accreditation requirements are established in accordance with the U.S. Code of Federal Regulations (CFR, Title 15, Part 285), National Voluntary Laboratory Accreditation Program, and encompass the requirements of ISO/IEC 17025.

8. The Synthetic Turf Manufacturer must have manufactured and installed fields at every level of competition, including high school, college and professional.

9. The Synthetic Turf Manufacturer must have at least five (5) NCAA Division 1 fields, (2) NFL installations and two (2) MLB fields currently installed.

10. The Synthetic Turf Manufacturer must not have had more than (5) five fields replaced, under warranty, during the past five (5) years.

11. The Synthetic Turf Manufacturer must be vertically integrated including in- house tufting, polyethylene monofilament extrusion, in-house coating, polyurethane compounding, manufacture own primary backing, in-house yarn texturizing, ability and flexibility to tuft various gauge widths and have the ability to recycle used/old fields.

12. The Synthetic Turf Manufacturer must have a fully integrated quality system, directly based on and compliant with ISO 9000, ISO 14001 and OHSAS 18001 international standards.

13. The Synthetic Turf Vendor shall offer a fully Cradle -to -Cradle certified synthetic turf system inclusive of the turf product, the underlayment and the infill.

14. The Synthetic Turf System Vendor shall have the capability to remove, reclaim and recycle the synthetic turf system at the end of its useful life.

The Synthetic Turf System Vendor must provide documentation outlining their product lifetime recycle / reuse program that is currently in place. A minimum of 5 fields must have been used in this process. All material must demonstrate the capability to reuse in a product that employs a cradle to cradle design. Reuse or other diversion plans that do not include production of a new and useful product will not be considered.

C. Synthetic Turf Contractor is defined as:

1. A contractor that has built and installed a minimum of ten (10) infilled synthetic turf fields. Turf contractors and on -site superintendent shall provide a resume to provide proof of experience.
a. At any time after award of the contract and before the completion of the project, should any member of the approved crew or
subcontractor discontinue their relationship with the synthetic turf 11012017

Page 2326 of 3058 ends

crew or subcontractor, the Owner shall be notified. Failure to provide personnel meeting the minimum qualifications shall be considered default of the contract requirements.

D. Warranty: The Synthetic Turf Contractor shall submit its Manufacturer's Warranty, which guarantees the usability and playability of the synthetic turf system for its intended uses for an eight (8) year period commencing with the date of Substantial Completion.

1. The warranty submitted must have the following characteristics:
a) Must provide full -field coverage for eight (8) years from date of Substantial Completion,
b) Must warrant materials and workmanship,
c) Must warrant that the materials installed meet or the product specifications within manufacturing tolerances,
d) Must have a provision to either repair or replace such portion of the installed materials that are no longer serviceable to maintain a serviceable and playable surface,
e) Must be a Manufacturer's warranty from a single source covering workmanship and all self -manufactured or procured materials, f) Must not be limited to the amount of annual usage,
g) Must provide, at the time of bid, a copy of its pre -paid 3rd party insurance policy. This policy must have an annual aggregate amount of no less than $60 million, and a per incident limit of no less than $7 million per claim. The third party insurer must have an AM Best rating of A++ or better.

1.5 Existing Conditions
A. If the surface on which the new synthetic turf is to be installed is an existing asphaltic/concrete base, the Synthetic Turf Contractor will be responsible for any damage due to negligence to the concrete during removal/installation of the synthetic turf system provided there are no failures below the surface which contribute to the damage. The football goal posts, if any, are to be removed and reinstalled by the Owner or Prime Contractor to facilitate the installation of the new synthetic turf system.

E. If the surface on which the new synthetic turf to be installed is a new asphaltic/concrete base or a new base of compacted, porous aggregate, the Synthetic Turf Contractor will be responsible for any damage to the base during removal/installation of the synthetic turf system after the deficiencies (if any) have been corrected by the base contractor with respect to planarity, compaction, and drainage/permeability. New in ground equipment, football goal post (if any) and /or infield mix backfill within the contiguous synthetic turf limits or immediately adjacent thereto are to be installed prior to the installation of the 11012017

Page 2327 of 3058 ends

synthetic turf system. Damage to the synthetic turf system during the installation of such materials is not the responsibility of the Synthetic Turf Contactor.

1.6 Schedule
A. The Synthetic Turf Contractor shall complete all work on the synthetic turf system in accordance with the published project schedule, or as mutually agreed upon.

B. The synthetic turf contractor will require unencumbered use of staging area within fifty (50) feet of the synthetic turf area(s) being installed in order to complete the work. The Synthetic Turf Contractor shall also be afforded unencumbered access through the construction site to reach the synthetic turf field area being installed.

1.7 Surface Area
A. The Synthetic Turf Contractor is to verify all measurements.

1.8 Utilities
A. Owner or Prime Contractor will supply necessary water, adequate lighting, and electricity for installation. Owner or Prime Contractor shall permit use of toilet and wash up facilities.

2.0 PRODUCTS

2.1 Approved Products: Shaw Sports Turf: Legion Pro; or approved equal

2.2 Materials
A. Shall be tufted, polyethylene, grass -like fabric coated with a secondary backing of high-grade polyurethane. Refer to grid in section 2.2 H. The two fibers specified in this grid shall be tufted through the same needle in a grass -like fabric to a finished pile -height also specified in the grid. The monofilament fiber must have multiple contours in the fiber cross-section consisting of a four -peak wave. The contour angles of the surface must result in interference of the light rays reflected by the surface to produce a dull appearance to the turf surface. The fiber must exhibit a general decrease in thickness from the center of the cross section to each tip.
11012017

Page 2328 of 3058 ends

B. All components and their installation method shall be designed and manufactured for use on outdoor athletic fields. The materials as hereinafter specified should be able to withstand exposure in all climates, be resistant to insect infestation, rot, fungus, mildew, ultraviolet light and heat degradation, and shall have the basic characteristics of flow -through drainage, allowing free movement of surface runoff through the synthetic turf fabric where such water may flow to the existing base and into the field drainage system.

C. The finished playing surface shall appear as mowed grass and shall resist abrasion and cutting from normal use.

D. The polyethylene pile yarn shall be a proven athletic caliber yarn designed specifically for outdoor use and stabilized to resist the effect of ultraviolet degradation, heat, foot traffic, water, and airborne pollutants.

E. The system shall be tufted at the pile height and gauge listed in specification grid, refer to grid in section 2.2 H.

F. The Primary Backing must be a multi -layer backing, contain UV stabilizers and must pass 3000 hours of QUV A testing, refer to grid in section 2.2 H.

G. The Secondary Backing of high-grade polyurethane shall be applied to the Primary Backing. Secondary Backing adds resistance to water degradation and strengthens grip on fibers, refer to grid in 2.2 H.

H. The entire backing shall be coated with holes perforated throughout the backing at the Synthetic Turf Manufacturer's recommended interval to allow for drainage. Partially coated backings or latex coating materials shall not be acceptable.

Pile Yarn
Polyethelene
Monoflament/Slit
Film
METHOD
Linear Density (Denier) Mono/Slit*
10,800/5,000
ASTM D 1577
Yarn Thickness Mono/Slit
300/100 microns
ASTM D 3218
Pile Weight****
46 oz./yd2
ASTM D 5848
Finished Pile Height****

2.0 ASTM D 5823
Product Weight (total)***
74 oz./yd2
ASTM D 5848
Primary Backing Weight****
8 oz./yd2
ASTM D 5848
Secondary Coating Weight+
20 oz./yd2
ASTM D 5848
Fabric Width
15' (4.57m)
ASTM D 5793
Tuft Gauge
1/2"
ASTM D 5793
Grab Tear Strength Avg.
> 200 lb. -F
ASTM D 5034
11012017

Page 2329 of 3058 ends

Tuft Bind (Avg.)
> 10 lb. -F
ASTM D 1335
Infilltrometer
> 25
ASTM D3885
Except where noted the above specifications are nominal. * Values are +/- 8%. ***Values are +/- 10 oz. ****Values are +/- 5%. +Values are +/- 3 oz./yd2.

I. Approved Infill Product: Shaw Sports Turf: NaturalPlay; or approved equal A. Shall be equivalent to NaturalPlay provided by Shaw Sports Turf, 185 S.

Industrial Blvd. Calhoun, GA 30701.

B. If the Contractor wishes to provide an equivalent, he/she shall provide information prior to the bid illustrating equivalent performance characteristics of the infill. The following criteria shall be met:
i. 100% natural combination of coconut husks and fiber with highly rounded shells from black and English walnuts.
ii. Balanced particle sizes distribution.
iii. Superior cooling capabilities.
iv. Perform well in all 7-playability metrics
v. 12-18 Mesh
vi. 0.2764 gr/cc density
Property
Standard
Specification
Sand Granule Shale
ASTM D442
Semi -rounded to rounded angularity
Sand Sieve Analysis
ASTM E11
20 / 40 MESH (0.85mm - 0.425 mm)
Infill Lbs. of Geofill
N/A

0.75 Infill Lbs. of Safeshell
N/A

0.75 Infill Lbs. of Sand
N/A

6.0 *Reference installation instructions
J. Approved Shock Pad: Schmitz EcoSport by Schmitz Foam or approved equal.

K. Perimeter edge details, underground storm sewer piping and connections, and goal post foundations required for the system shall be as detailed and recommended by the Design Professional, and as approved by the Owner. The cost for these embedded items shall be included in the Sitework Contractor's price along with the compacted, porous base.

3.0 EXECUTION

3.1 General
A. The installation shall be performed in full compliance with approved shop drawings.
11012017

Page 2330 of 3058 ends

B. Only factory -trained technicians skilled in the installation of athletic caliber synthetic turf systems shall undertake the placement of the system.

C. Subject to the requirements in Section 1.2(B), the surface to receive the synthetic turf shall be verified by the Synthetic Turf Contractor as ready for the installation of the synthetic turf system and must be perfectly clean as installation commences and shall be maintained in that condition throughout the process.

3.2 Removal (if necessary)
A. Synthetic Turf Contractor shall remove the existing synthetic turf and under -pad from the field (as required by contract).

B. After removal of the stadium surface, the existing synthetic turf and pad materials shall be rolled up and placed at a location designated by the Owner.

3.3 Installation
A. The completed base and adjacent curbs/perimeter nailer shall be inspected by the Engineer or Sitework Contractor by means of a laser and plotted on a 10 -foot grid. Based upon the Contractor's inspection of the topographical survey, the Sitework Contractor shall fine grade the base suitably, including properly rolling and compacting the base to achieve a surface planarity within 1/4" in 10 -feet (+0, - 1/4"). OWNER, ENGINEER, OR PRIME CONTRACTOR SHALL NOT

APPROVE THE BASE FOR TOLERANCE TO GRADE WITHOUT
OBTAINING THE TOPOGRAPHICAL SURVEY.

B. Subgrade and base shall be uniformly compacted to a minimum of 95% of maximum dry density. Care must be exercised to minimize segregation.

Engineer/Sitework Contractor shall make written records available to Synthetic Turf Contractor's inspector for both drainage/permeability and compaction/planarity as obtained from a minimum 10' x 10' grid.

C. The Synthetic Turf Project Superintendent shall thoroughly inspect all synthetic turf materials delivered to the site for both mixing and quantity to assure that the entire installation shall have sufficient material to maintain proper mixing ratios.

D. Synthetic turf shall be loose -laid across the field, stretched, and attached to the perimeter edge detail. Synthetic turf shall be of sufficient length to permit full cross -field installation. No head or cross seams will be allowed except as needed for inlaid fabric striping or to accommodate programmed cut-outs.

E. All seams shall be flat, tight, and permanent with no separation or fraying.

Selvedge edges of all panels must be cut and discarded prior to being installed.

Gluing method is preferred. Seaming tape is to be constructed of high tenacity, 11012017

Page 2331 of 3058 ends

coated non -woven fabric. Any inlaid markings shall be adhered to seaming tape with a high strength polyurethane adhesive applied per the Synthetic Turf Manufacturer's standard procedures for outdoor applications. All main fabric seams shall be transverse to the field direction (i.e. run perpendicularly across the field).

F. Infill materials shall be properly applied in numerous lifts using special broadcasting equipment. The synthetic turf shall be raked and brushed properly as the mixture is applied. The infill materials can only be applied when the synthetic turf fabric is dry.

L. g -Max (shock attenuation) test < 200 at installation.

3.4 Field Markings and Decorations
A. Field markings and decorations shall be installed in accordance with approved project shop drawings.

3.5 Clean Up
A. Synthetic Turf Contractor shall provide the labor, supplies, and equipment, as necessary, for final cleaning of the surfaces.

B. The Synthetic Turf Contractor shall keep the area clean and clear of debris throughout the project.

C. Surfaces, recesses, enclosures, etc., shall be cleaned as necessary to leave the work area in a clean, immaculate condition ready for immediate occupancy and use by Owner.
11012017

Page 2332 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 32 93 00
PLANTS
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes: All labor, materials, supplies, tools and transportation to perform all operations in connection with and reasonably incidental to the complete installation of the planting as shown on the Drawings, and specified herein.

B. Work includes but is not limited to:

1. Plant Material

2. Mulches

3. Weed Barrier (Sheet Mulch)

4. Tree Staking

5. 1 -year Landscape Establishment
C. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 RELATED SECTIONS:

A. Section 01 74 19 "Construction Waster Management and Disposal" B. Section 31 10 13 "Site Preparation and Plant Protection" C. Section 32 91 13 "Soil Preparation"
D. Section 31 23 00 "Excavation and Fill"
E. Section 32 84 00 "Landscape Irrigation"

1.3 QUALITY ASSURANCE
A. Contractor must have a valid California C-27 Contractor's license authorized by the State of California.

B. Contractor shall provide evidence of sufficient experience with similar projects.

Provide list including a minimum of five recently installed projects with location, date completed, owner, and contact person and phone number.

C. Contractor must have assigned to the project at least one employee possessing a PLANTS 32 93 00-1

Page 2333 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
California State Chemical Applicator's License for the control of weeds, plant diseases and other pests.

D. Plant materials: All plants shall have been grown in nurseries that have been inspected by State of California Department of Agriculture and will be tagged with correct names as per Standard Plant Names. All plant material will be inspected by the Owner's Representative before being planted, and all plant material not meeting specification requirements will be rejected. Replace, at expense of Contractor, rejected trees, shrubs and groundcovers with plant materials of species and variety that meet specification requirements.

E. Drawings: For the purposes of clarity and legibility, the drawings are essentially diagrammatic, exact location of items are not indicated unless specifically dimensioned. Do not willfully install the landscape materials as shown on the drawings when it is obvious in the field that unknown obstructions, grade differences or discrepancies in area dimensions exist. Such obstructions or differences shall be brought to the attention of the client. In the event this notification is not performed, the Contractor will assume full responsibility for any revision necessary.

1.4 SUBMITTALS
A. Product Data: For each of the following:

1. Mulch: Cut sheet verifying feedstock type and producer.

2. A complete plant list indicating species, variety, quantity and size shall be submitted to and accepted by the Owner's Representative prior to locating plant material on -site.

3. Tree Staking materials

4. Sheet Mulch Materials: 100% Recycled B Flute Cardboard B. Samples for Verification: For each of the following:

1. The following items shall be submitted in a 1 -pint minimum volume of each in sealed plastic bag or container. Submittal shall be labeled with weight and source of each item. Each submittal shall represent a true sample of material to be provided at the project site:
a. Mulch
PART 2 - PRODUCTS

2.1 PLANT MATERIAL
A. No planting substitutions will be allowed without prior written approval of the Landscape Architect.

B. All plant material must be neonicotinoid free.

PLANTS 32 93 00-2

Page 2334 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
C. Provide plants typical of their species or variety, with normal, densely developed branches and vigorous, fibrous root systems. Provide only sound, healthy, vigorous plants free from defects, disfiguring knots, sunscald injuries, frost cracks, abrasions of the bark, plant diseases, insect eggs, borers, and all forms of infestation. All plants shall have a fully developed form without voids and open spaces.

D. Plants larger than those specified in the plant list may be used when acceptable to the Landscape Architect. If the use of larger plants is acceptable, increase the spread of roots or rootball in proportion to the size of the plant.

E. Plants planted in rows shall be matched in form.

F. Meet all requirements of USA Standard for Nursery Stock, published by the American Association of Nurserymen, Inc., except as otherwise supplemented and modified under this specification section.

G. Cold storage plants are not acceptable.

H. Container plants, one gallon size and larger, shall have grown therein a minimum of six months and a maximum of two years, with roots filling the containers but not showing evidence of being or having been restricted, deformed or rootbound.

I. Provide untapped, straight, single -leader trees except for multiple stem (clump) trees. Deciduous trees shall have heavier than normal top and balanced branching.

J. Trees and shrubs shall have well -developed branch systems; shrubs shall be full - foliaged and not leggy.

K. Thin, weak and leggy plants will be rejected by the Engineer.

L. All plant material shall be legibly tagged by specie and variety.

M. Nomenclature: Genus, species and variety as indicated on Plant Material Listing.

Plant names are in accordance with those given in Standardized Plant Names, 1942 edition; names of varieties not included therein go by names generally accepted in nursery trade.

N. Plant materials not meeting these requirements shall be removed from the site and replaced to the satisfaction of the Owner's Representative Contractor's expense.

2.2 MULCH
A. Mulch shall be:

1. Made from organic materials including tree trimmings, clean (unpainted and untreated) wood or wood and plant trimmings, including medium -coarse compost.

2. Free of physical contamination with zero visible contamination at time of final walk- through. If contamination is present when mulch is delivered, contractor shall reject load or remove contamination.

PLANTS 32 93 00-3

Page 2335 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3. It cannot include forest industry products and byproducts such as redwood bark, peat moss, or gorilla hair, recycled tires or other inorganic materials.

4. Local and generated from feedstock/ materials sourced within 100 miles or produced at a facility within 100 miles of the project site.

5. Light in color. Black mulches or grape seed pumice mulch is not allowed

6. Acceptable mulch suppliers include:

Recycled mulch- Treeincarnation - Greenwaste recycle yard http://www.greenwasterecycleyard.com/mulch.htm

2.3 WEED BARRIER (SHEET MULCH) CARDBOARD
A. Cardboard for sheet mulch shall be 100`)/0 recycled B flute cardboard 70# weight.

Rolls of 70# weight cardboard are 36" x 250' and are sold at a 25 roll minimum.

2.4 TREE STAKING MATERIALS
A. Staking Materials:

1. Stakes: Lodgepole pine (untreated), 2 -inch diameter by 10 feet long minimum actual dimensions, of uniform size and pointed at one end.

2. Ties: recycled car tire straps, recycled bicycle innertube or approved equal.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine areas to receive plants for compliance with requirements and conditions affecting installation and performance.

1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area.

2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions.

3. Suspend soil spreading, grading, and tilling operations during periods of excessive soil moisture until the moisture content reaches acceptable levels to attain the required results.

4. Uniformly moisten excessively dry soil that is not workable and which is too dusty.

3.2 WEED BARRIER (SHEET MULCH)
PLANTS 32 93 00-4

Page 2336 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. Shrub, tree and groundcover areas:

1. Sheet mulch to be applied to ALL planting areas.

2. Incorporate 3CY/1000sf of quality compost specified above in section 3.2 into the site soil.

3. Install 5 gallon and larger plant materials

4. Apply a minimum of two layers of 100% recycled B flute cardboard as a biodegradable weed barrier to the entire planting area, completely covering all existing soil and remaining herbaceous vegetation, if any. a. Wet cardboard while applying to prevent it from blowing away. b. Sheets of cardboard shall overlap a minimum of 12".
c. Cardboard shall abut directly against edge of pavement, curbs, boulders or other site features. Cardboard shall not cover tree and shrub root crowns.
d. Fold excess cardboard under itself when abutting against hardscape objects or root crowns areas, as opposed to being cut, avoid excessive cardboard scraps This folding under process is greatly aided when the cardboard is wet.
e. Avoid walking on wet cardboard or tearing cardboard. Tears allow weeds to grow through the barrier.
f. All cardboard scraps shall remain separated from other construction debris and shall be disposed at the local recycling facility or used on site to cover any holes in cardboard creating during installation.

5. Install an additional 3CY/1000sf of quality organic compost on top of cardboard layer prior to planting to protect cardboard from tearing.

6. Planting in sheet mulch:
a. Include other organic amendments as recommended by the soils report per section 2.2 and 2.3.
b. For 4" pots or smaller plant directly into the compost layer on top of the cardboard without additional compost backfill.
c. For 1 gallon and larger plants, punch or cut holes in the cardboard to plant. Top of rootball shall be even with top of mulch. Keep stems and trunks of all plants clear of compost, mulch, and debris. Incorporate quality, organic compost with excavated soil from the plant pit at a ratio of 1 part compost to 2 parts soil, or as recommended by the soils report.

7. Layout drip lines.

PLANTS 32 93 00-5

Page 2337 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

8. Apply 3 inches of mulch on top of the compost for a total sheet mulch depth of approximately 4 inches.

3.3 TREE, SHRUB, VINE AND GROUNDCOVER PLANTING
A. Before planting, verify that root flare is visible at top of root ball according to ANSI Z60.1. If root flare is not visible, remove soil in a level manner from the root ball to where the top -most root emerges from the trunk. After soil removal to expose the root flare, verify that root ball still meets size requirements.

B. Remove stem girdling roots and kinked roots. Remove injured roots by cutting cleanly; do not break.

C. Excavate circular planting pits with sides sloping inward at a 45 -degree angle.

Excavations with vertical sides are not acceptable.

D. Trim perimeter of bottom leaving center area of bottom raised slightly to support root ball and assist in drainage away from center. Do not further disturb base. Ensure that root ball will sit on undisturbed base soil to prevent settling. If area under the plant was initially dug too deep, add soil to raise it to the correct level and thoroughly tamp the added soil to prevent settling.

E. Scarify sides of planting pit if smeared or smoothed during excavation.

F. Excavate approximately three times as wide as ball diameter for trees and two times for shrubs.

G. Maintain required angles of repose of adjacent materials as shown on the Drawings.

Do not excavate subgrades of adjacent paving, structures, hardscapes, or other new or existing improvements.

H. Maintain supervision of excavations during working hours.

I. Keep excavations covered or otherwise protected when unattended by Installer's personnel.

J. Imported topsoil removed from excavations may be used as backfill. Backfill mix should be amended per soils test.

K. Obstructions: Notify Owner's Representative if unexpected rock or obstructions detrimental to trees or shrubs are encountered in excavations.

L. Drainage: Notify Owner's Representative if subsoil conditions evidence unexpected water seepage or retention in tree or shrub planting pits. Fill each pit with water, then observe drainage rate for problems prior to plant installation. If drainage problems are present, discuss with the Engineer.

M. Fill excavations with water and allow to percolate away before positioning trees and shrubs.

PLANTS 32 93 00-6

Page 2338 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
N. Set trees and shrubs 1" above finished grade. Finish grade is soil level, not including compost and mulch.

O. Space 1 -gallon groundcover and shrubs evenly as indicated on the drawings, staggering the spaces around larger shrubs and trees.

P. A four -inch -high water basin shall be constructed around each shrub and tree. After planting, water each plant by filling basin twice.

Q. All trees shall be staked and tied as per detail immediately after planting. Trees will stand plumb after staking.

R. Water plantings thoroughly every two to three days as required to establish proper rooting.

S. Groundcovers in Flats: Supply delivery tags to help confirm adequacy of plant spacing's. Engineer will take particular care in ensuring that these plants are spaced as specified on plans.

3.4 TREE AND SHRUB PRUNING
A. Remove only dead, dying, or broken branches. Do not prune for shape.

B. Prune, thin, and shape trees, shrubs, and vines as directed by Landscape Architect.

C. Prune, thin, and shape trees, shrubs, and vines according to standard professional horticultural and arboricultural practices. Unless otherwise indicated by Landscape Architect, do not cut tree leaders; remove only injured, dying, or dead branches from trees and shrubs; and prune to retain natural character.

D. All tree species shall have one singular leader unless specified as multi stem. Trees with multiple leaders may be rejected by Landscape Architect; if approved, contractor will preserve the leader that will best promote the symmetry of the plant. Cut branches flush with the trunk or main branch, at a point beyond a lateral shoot or bud a distance of not less than one-half the diameter of the supporting branch. Make cut on an angle.

E. Do not apply pruning paint to wounds.

3.5 TREE STAKING
A. Install trunk stabilization as follows unless otherwise indicated:

B. Staking: Stake all trees per plan and details.

3.6 LANDSCAPE ESTABLISHMENT
A. See section 1.1 for landscape establishment duration.

B. Plant trimmings must be cut to less than 4 inches and reincorporated into the mulch layer of the landscape area away from storm drains. If plant trimmings are too much PLANTS 32 93 00-7

Page 2339 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
for the landscape area as directed by the City Contractor to export plant debris to a facility where it will be used to produce compost or mulch. Exempt materials include palm fronds, cactus and poison oak as defined by local regulations.

C. Pruning

1. Selective pruning. Plants shall be pruned selectively to remove individual stems or branches that extend beyond the natural conformation of the plant to a lateral branch or at the point of attachment. Woody groundcovers shall be selectively pruned to control growth towards pavements rather than edged.

2. Hedging and shearing. Contractor shall not sheer plants into formal shapes as this destroys the natural form of the plant and generates excessive waste.

3. Tree pruning shall be performed only by trained, experienced personnel An I.S.A.

Certified Arborist or Tree Worker is to be present at all times during pruning.

D. Protect soil from compaction. Soil may not be worked when wet, generally between October and April. Throughout the year when temporary vehicular access is needed over non -paved areas, distribute the load over the soil with 6 inches of coarse organic mulch or reusable planks. Maintain a 3 -inch layer of mulch.

E. Quality, organic compost must be used as the soil amendment for all landscape areas. Compost must meet all requirements in section 2.3 above. Timing of compost applications to be determined by the City.

1. Topdress shrub areas with 3/8 -inch compost one time per year (for bidding purposes).

F. Use only organic fertilizers and amendments

1. Acceptable products are those allowed for use in crop production by at least one of the following:
a. Organic Materials Review Institute's Generic Materials List b. California Department of Food and Agriculture's Organic Input Materials Program
c. U.S. Department of Agriculture's National Organic Program

2. Schedule: For bidding purposes apply the following fertilizers: compost, compost tea, and organic fertilizers. The nitrogen content of compost varies; check with producer. Fertilize per soils test maintenance recommendations.

G. Mulching. Contractor shall maintain a minimum of 3" of mulch at all times over soil surface that is not covered by vegetation. Keep mulch 6" away of tree trunks and 4" away from shrub stems. Mulch shall be reapplied at least once per year. Restore plant basins. Replenish mulch to a three inch depth at 6 months and right before the end of one year establishment period.

PLANTS 32 93 00-8

Page 2340 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
H. Irrigation Maintenance, Monitoring and Repair

1. Determine irrigation run time demand monthly by recording water meter reading before and after irrigation. Report water use to the property City at a minimum of once a month. Reconcile this data with run times and flow rates to determine if there is unusual consumption which may indicate stuck valves or leaks.

2. Assess the irrigation system while it is in operation at every site visit during the watering season.

3. Submit monthly documentation of irrigation checks to the City and note any changes or adjustments to the system on the 'as built' irrigation plans.

4. Perform the following weekly April through October and monthly November through March:
a. Clean and adjust all sprinkler and bubbler heads, drip emitters and valves for proper coverage.
b. Check and adjust irrigation system pressure.

5. Perform the following systems check twice a year, at a minimum:
a. Ensure all flush valve/cap locations and valve boxes are visible and can be opened.
b. Inspect valves, filters, and pressure regulators for damage or leaks. c. Check wire splices.
d. Clean valve boxes of dirt and debris.
e. Inspect, clean and flush filters and replace damaged or torn filters. f. Flush laterals.
g. Make sure plants have adequate numbers of drip emitters for their size. h. Test backflow preventers.

I. Soil subsidence- Fill in any soil subsidence that may occur, replant trees and or shrubs that may have settled.

J. Adjust and repairing tree staking materials.

K. Utilize Integrated Pest Management- see section 3.16. Utilize Organic Pest Management. Pesticides that are not allowed by OMRI in its generic materials list are prohibited.

L. Weed management

1. Weeds must be properly managed throughout the duration of the establishment PLANTS 32 93 00-9

Page 2341 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
period in all planting areas including but not limited to non -irrigated native seed mix, seeded lawn, native no mow seed and biofiltration sod and mulched tree and mulched shrub and groundcover planting aras.

2. Weeds should be removed at a minimum of once a month. Acceptable weed levels to be approved by the City.

3. Herbicides: When cultural, mechanical, physical and biological controls have provided inadequate pest control; the City may select and apply an appropriate least -toxic herbicide as a last resort. Only OMRI- or Our Water Our World (OWOW)- listed herbicides may be used without written permission of the City.

Herbicides not on the OMRI or OWOW lists, including Roundup, may only be used with the written permission of the City

4. Approved Herbicides include:
a. Herbicidal soaps (fatty acids of potassium salts).
b. Acetic and citric acids.
c. Clove, citrus, mint and thyme oil.
d. Corn gluten meal pre -emergent.

5. Prohibited herbicides:
a. Groundwater contaminants such as: Atrazine (Aatrex) - groundwater contaminant, Simazine (Princep), Bromacil (Hyvar, Krovar), Prometon (Pramitol), Bentazon (Basagran) and Norflurazon (Solicam, Predict, Zorial). b. Compost contaminants, such as Picloram and Clopyralid.

6. Notice of herbicide use:
a. Use the notification and posting requirements listed above in Section

5.1, E.3.c - Notice of Pesticide Use.

3.7 INTEGRATED PEST MANAGEMENT
A. Contractor shall utilize integrated pest management (IPM) practices during installation and establishment period to control pests and disease in the landscape.

IPM uses cultural, mechanical, physical, and biological control methods before using pesticides. Chemical controls are applied only when monitoring indicates that preventative and non -chemical methods are not keeping pests below acceptable levels. When pesticides are required, the least toxic and the least persistent pesticide that will provide adequate pest control is applied.

B. Controls:

1. Cultural/Mechanical/physical methods will be used as the first choice in weed management.

PLANTS 32 93 00-10

Page 2342 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
a. Monitor planting areas frequently to identify and eradicate weeds early in the growth stage prior to their setting seed.
b. Cut or pull weeds using hand -operated equipment where possible. c. Mulches shall be maintained at all times over soil surface that is not covered by vegetation.
d. Propane -fueled flamers may be used in winter and spring with required permits and approval by the Fire Marshall to kill early -season, non -grass weeds by heating the cells until they burst. The weed quickly wilts and dies.

C. If allowed on this project, Contractor shall apply all chemicals in a safe manner and according to label instructions and Agency, State and Federal requirements. A California Chemical Applicators license is required by the Contractor for chemical applications. The Contractor shall mix and apply chemicals to protect against accidental spills and drift to non -target areas, and to insure safety of the applicator.

Any spilled chemicals, as well as contaminated soil, water, and/or landscape materials must be removed from the Project and disposed of in accordance with the Agency requirements. The Contractor shall maintain applicator's licenses and records of applications as required by the State.

D. A Chemical Work Report shall be completed for each chemical application.

1. The Contractor is responsible for submitting chemical usage reports to the County Agricultural Department.

2. Contractor shall maintain records of all pest management activities. Each record shall include the following information:
a. target pest;
b. type and quantity of pesticide used;
c. site of the pesticide application;
d. date the pesticide was used;
e. name of the pesticide applicator;
f. application equipment used;
g. prevention and other non -chemical methods of control used.

3. Contractor shall submit the pest management record to Owner on monthly basis.

3.8 CLEANUP AND PROTECTION
A. Contractor shall exercise caution to avoid washing or sweeping dirt and debris into the storm drain system.

PLANTS 32 93 00-11

Page 2343 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3.9 DISPOSAL
A. Recycle all waste per City of Beaumont mandates. Reuse or return unused items such as palettes, flats and pots. All plant debris shall be separated from other refuse and taken to a facility where it will be recycled i.e., to produce compost or mulch.

END OF SECTION 32 93 00
PLANTS 32 93 00-12

Page 2344 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 33 05 16

UTILITY STRUCTURES
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Manhole structures for gravity storm drain and sanitary sewer utilities.

1.02 RELATED SECTIONS
A. Section 31 23 33 — Trenching and Backfilling.

B. Section 33 40 00 - Storm Drainage Utilities.

C. Section 32 05 23 — Cement and Concrete for Exterior Improvements.

1.03 RELATED DOCUMENTS
A. AASHTO:
(1) M 199: Precast Reinforced Concrete Manhole Sections.

B. ASTM:
(1) A 615/A615M: Deformed and Billet -Steel Bars for Concrete Reinforcement.
(2) C 478: Precast Reinforced Concrete Manhole Sections. (3) C 1244: Test Method for Concrete Sewer Manholes by Negative Air Pressure (Vacuum) Test.

C. Caltrans Standard Specifications.
(1) Section 51, Concrete Structures.
(2) Section 75, Miscellaneous Metal.

D. California Building Code.
(1) Section 1172B — Exterior Routes of Travel.

1.04 DEFINITIONS
A. AASHTO: American Association of State Highway and Transportation Officials.

B. ASTM: American Society for Testing Materials.

1.05 SUBMITTALS
A. Follow submittal procedures outlined in Section 01 33 00 - Submittal Procedures.

UTILITY STRUCTURES 33 05 16 -1

Page 2345 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Product data for the following:
(1) Cleanout plugs or caps.

C. Shop drawings: Include plans, elevations, details and attachments for the following:
(1) Precast concrete manholes, frames and covers.
(2) Precast concrete clean out boxes and box covers.

D. Design Mix Reports and Calculations: For each class of cast -in -place concrete.

E. Field Test Reports: Indicate and interpret test results for compliance with performance.

1.06 DELIVERY, STORAGE AND HANDLING
A. Handle precast concrete manholes according to manufacturer's written instructions.

B. Protect imported bedding and backfill material from contamination by other materials.

PART 2 PRODUCTS

2.01 CLEANOUTS
A. Piping: Same as sanitary sewer line if possible.

B. Top Cap: Threaded and of same material as piping if possible.

C. Box Size: As required to provide access and allow easy removal and reinstallation of cap.

D. Box Types:
(1) Landscape Areas: Portland cement concrete box and box cover (bolt - down), light duty.
(2) Traffic Areas: Portland cement concrete box and box cover or steel or cast iron cover, heavy duty, both box and cover (bolt down) to be rated for AASHTO H20 loading.

E. Box Cover Markings: "S.D." for storm drain cleanouts, "S.S." for sanitary sewer cleanouts, unless otherwise specified.

F. Available Manufacturers: Subject to compliance with requirements, box manufacturers offering products that may be incorporated into the Project include, but are not limited to the following:
(1) Associated Concrete Products, Inc. (Santa Ana, California) (Tel. 714-557- 7470).

UTILITY STRUCTURES 33 05 16 - 2

Page 2346 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Brooks Products Inc. (El Monte, California) (Tel. 818-443-3017). (3)

2.02 MANHOLES
A. General: Size, shape, configuration, depth, etc. of manhole and frame and cover shall be as indicated.

Christy Concrete Products, Inc. (Fremont, California) (Tel. 800-486 7070).

B. Portland Cement Concrete and Reinforcing:
(1) Cast -In -Place Portion: Use Class A Concrete per Caltrans Standard Specification Section 90, and ASTM A615 Grade 60 reinforcing steel bars.
(2) Precast Portion: ASTM C 478. Rate for AASHTO H20 loading in traffic areas.

C. Frames and Covers: As indicated and in accordance with Caltrans Standard Specification Section 75-1.02.

D. Steps: ASTM C 478 or AASHTO M 199. Manufacture from deformed, '/z -inch steel reinforcement rod complying with ASTM A 615 and encased in polypropylene complying with ASTM D4101. Include pattern designed to prevent lateral slippage off step. Acceptable manufacturer is Hanson Concrete Products, (Milpitas, CA) (Tel 408-262-1091) or equal.

E. Force Main Piping Access Openings:
(1) General: As indicated.

2.03 JOINT SEALANT FOR STRUCTURES AND MANHOLES
A. Mortar: Caltrans Standard Specification Section 51-1.135. (1) Use to seal around pipes at connections to structures and manholes. Also use to seal joints between precast sections of structures and manholes.

B. Gaskets: Preformed flexible rubber or plastic gasket. (1) Rubber Gaskets: ASTM C443.
(2) Plastic Gaskets: Federal Specification SS -S-00210 (GSA-FSS), Type I, Rope Form; or alternate standard which may exist. Acceptable material is "Ram-Nek," as manufactured by the K. T. Snyder Company (Houston TX), or equal.

PART 3 EXECUTION

3.01 CLEANOUT INSTALLATION
A. General: Install as indicated.

3.02 MANHOLE INSTALLATION
UTILITY STRUCTURES 33 05 16 -3

Page 2347 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. General: Install as indicated.

3.03 TESTING OF MANHOLES ON GRAVITY LINES
A. At the option of the Contractor, either the following hydrostatic or vacuum test shall be performed.

B. Hydrostatic Test:
(1) Insert inflatable plugs in all sewer inlets and outlets. (2) Fill the manhole with water to a point six inches below the base of the manhole frame.
(3) Maintain the water at this point for one hour to allow time for absorption. (4) Begin one -hour test period. Measure the amount of water added in one - hour period to maintain the water level at six inches below the base of the manhole frame. Do not allow water level to drop more than 25% of the manhole depth.
(5) Determine the allowable leakage by the following formula. (6) L=0.0002 x D X H 1/2
(7) L = Allowable leakage, gallons per minute.
(8) D = Depth of manhole from top to bottom, feet.
(9) H = Head of water in feet as measured from the surface of the water in the manhole to the sewer line invert or to the prevailing ground water surface outside the manhole. The lesser height governs. (10) If the leakage exceeds the allowable, determine the cause, take remedial action and re -test the manhole. If the leakage is less than the allowable and leaks are observed, repair the leaks.

C. Vacuum Test:
(1) General: Test in accordance with ASTM C 1244.
(2) Test prior to backfilling around the manhole.
(3)
Test Preparation: Plug all lift holes and pipes entering or exiting the manhole.
(4) Place test head inside the top section of the manhole's cone section and inflate in accordance with the manufacturers instructions. (5) Draw a vacuum of 10 -inches of mercury and shut the pump off. (6) With the valve closed, the time for the vacuum to drop 9 -inches shall be measured.

The manhole shall pass the test if the time is greater than 60 seconds for (7)
UTILITY STRUCTURES 33 05 16 - 4

Page 2348 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
a 48 -inch diameter manhole, 75 seconds for a 60 -inch diameter manhole and 90 seconds for a 72 -inch diameter manhole.
(8) If the manhole fails the initial test, make necessary repairs with a non - shrink grout while the vacuum is still being drawn. Retest until a satisfactory test is obtained.

END OF SECTION 33 05 16
UTILITY STRUCTURES 33 05 16 - 5

Page 2349 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 33 10 00

WATER UTILITIES
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Site water distribution system for domestic and fire protection services up to 5 feet of any on -site building being served.

B. Domestic water and fire protection water transmission or distribution system within a roadway or street right-of-way.

1.02 RELATED SECTIONS
A. Section 31 23 33 — Trenching and Backfilling.

B. Section 32 05 23 — Cement and Concrete for Exterior Improvements.

1.03 RELATED DOCUMENTS
A. ASTM:
(1) A 536: Specification for Ductile Iron Castings.
(2) B 88: Specifications for Seamless Copper Water Tube. (3)
D 1785: Specifications for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.
(4) D 2564: Specifications for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems.

B. AWWA:
(1) C104: Cement -Mortar Lining for Ductile -Iron Pipe and Fittings for Water. (2) C105: Polyethylene Encasement for Ductile -Iron Pipe Systems. (3) C110: Ductile -Iron and Gray -Iron Fittings, 3 In. Through 48 In. (76 mm Through 1,219 mm) for Water.
(4) C111: Rubber -Gasket Joints for Ductile -Iron Pressure Pipe and Fittings. (5) C115: Flanged Ductile -Iron Pipe with Ductile -Iron or Gray -Iron Threaded Flanges.
(6) C150: Thickness Design of Ductile Iron Pipe.
(7) C151: Ductile -Iron Pipe, Centrifugally Cast, for Water. (8) C153: Ductile- Iron Compact Fittings for Water Service.

WATER UTILITIES 33 10 00 -1

Page 2350 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(9)
C200: Steel Water Pipe -6 In. (150 mm) and larger.
(10) C203: Coal -Tar Protective Coatings and Linings for Steel Water Pipelines -Enamel and Tape -Hot Applied.
(11) C205: Cement -Mortar Protective Lining and Coating for Steel Water Pipe - 4 In. and Larger -Shop Applied.
(12) C207: Steel Pipe Flanges for Waterworks Service -Sizes 4 In. Through 144 In. (100 mm Through 3,600 mm).
(13) C208: Dimensions for Fabricated Steel Water Pipe Fittings. (14) C209: Cold Applied Tape Coatings for the Exterior of Special Sections, Connections and Fittings for Steel Water Pipelines.
(15) C210: Liquid -Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines.
(16) C213: Fusion -Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines.
(17) C214: Tape Coating Systems for the Exterior of Steel Water Pipelines. (18) C218: Coating the Exterior of Aboveground Steel Water Pipelines and Fittings.
(19) C219: Bolted, Sleeve -type Couplings for Plain -End Pipe. (20) C500: Metal -Seated Gate Valves for Water Supply Service. (21) C502: Dry -Barrel Fire Hydrants.
(22) C503: Wet Barrel Fire Hydrants.
(23) C504: Rubber Seated Butterfly Valves.
(24) C507: Ball Valves 6 In. Through 8 In. (150 mm Through 1,200 mm). (25) C508: Swing -check Valves for Waterworks Service, 2 In. (50mm) Through 24 In. (600 mm) NPS.
(26) C509: Resilient -Seated Gate Valves for Water Supply Service. (27) C510: Double Check Valve Backflow-Prevention Assembly. (28) C511: Reduced -Pressure Principle Backflow-Prevention Assembly. (29) C512: Air -Release, Air/Vacuum, and Combination Air Valves for Waterworks Service.
(30) C550: Protective Epoxy Interior Coatings for Valves and Hydrants. (31) C600: Installation of Ductile -Iron Water Mains and Their Appurtenances.

WATER UTILITIES 33 10 00 - 2

Page 2351 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(32) C605: Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings.
(33) C606: Grooved and Shouldered Joints.
(34) C651: Disinfecting Water Mains.
(35) C800: Underground Service Line Valves and Fittings. (36) C900: Polyvinyl Chloride (PVC) Pressure Pipe and Fittings, 4 In. Through 12 In. (100mm Through 300mm) for Water Distribution.
(37) C901: Polyethylene (PE) Pressure Pipe and Tubing, 1/2 In. (13mm) Through 3 In. (76mm) for Water Service.
(38) C905: Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 In. Through 48 In. (350 mm Through 1,200 mm) for Water Transmission and Distribution.
(39) C906: Polyethylene (PE) Pressure Pipe and Fittings, 4 In. (100 mm) through 63 In (1,575 mm), for Water Distribution and Transmission. (40) C907: Polyvinyl Chloride (PVC) Pressure Fittings for Water — 4 In. through 8 In. (100 mm Through 200 mm).
(41) C908: PVC Self -Tapping Saddle Tees for Use on PVC Pipe. (42) M11: Steel Pipe - A Guide for Design and Installation. (43) M23: PVC Pipe — Design and Installation.
(44) M41: Ductile -Iron Pipe and Fittings.

1.04 DEFINITIONS
A. AASHTO: American Association of State Highway and Transportation Officials.

B. ASTM: American Society for Testing Materials.

C. AWWA: American Waterworks Association
D. DI: Ductile iron.

E. DIP: Ductile iron pipe.

F. FM: Factory Mutual.

G. NFPA: National Fire Protection Association.

H. NSF: National Sanitation Foundation.

PCC: Portland cement concrete.

J. PE: Polyethylene.

WATER UTILITIES 33 10 00 - 3

Page 2352 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
K. PVC: Polyvinyl Chloride.

L. UL: Underwriters Laboratory.

1.05 SYSTEM PERFORMANCE REQUIREMENTS
A. Minimum Internal Pressures: As indicated on plans.

B. External Load: Earth load indicated by depth of cover plus AASHTO H20 live load unless indicated otherwise.

1.06 SUBMITTALS
A. Follow submittal procedures outlined in Section 01 33 00 - Submittal Procedures.

B. Product Data: For the following:
(1) Piping materials and fittings.
(2) Pipe couplings.
(3) Flexible pipe fittings.
(4) Restrained pipe fittings.
(5) High deflection fittings/ball joints.
(6) Expansion joints.
(7) Flexible expansion joints.
(8) Gate valves.
(9) Butterfly valves.
(10) Check valves.
(11) Air and vacuum relief valves.
(12) Blow -off valves.
(13) Pressure reducing valves.
(14) Pressure sustaining valves.
(15) Ball valves.
(16) Fire hydrants.
(17) Post indicator valves.
(18) Fire department connections.

WATER UTILITIES 33 10 00 - 4

Page 2353 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(19) Backflow preventers.
(20) Precast valve boxes and box covers.

C. Shop drawings: Include plans, elevations, details and attachments. (1) Precast and cast in -place vaults and covers.
(2) Wiring diagrams for alarm devices.

D. Field test reports: Indicate and interpret test results for compliance with the Project requirements.

1.07 QUALITY ASSURANCE
A. Comply with requirements of utility supplying water. Do not operate existing valves or tap existing piping without written permission and/or presence of utility company representative.

B. Comply with the following requirements and standards:
(1) NSF 61: "Drinking Water System Components -Health Effects" for materials for potable water.
(2) NFPA 24: "Installation of Private Fire Service Mains and Their Appurtenances" for materials, installations, tests, flushing, and valve and hydrant supervision.
(3)
CEC: "California Electric Code" for electrical connections between wiring and electrically operated devices.

C. Provide listing/approval stamp, label, or other marking on piping and specialties made to a specified standard.

1.08 MATERIAL DELIVERY, STORAGE AND HANDLING
A. Preparation for Transport: Prepare valves, including fire hydrants, according to the following:
(1) Ensure that valves are dry and internally protected against rust and corrosion.
(2) Protect valves against damage to threaded ends and flange faces. (3) Set Valves in best position for handling. Set valves closed to prevent rattling.

B. Deliver piping with factory -applied end -caps. Maintain end -caps through shipping, storage and handling to prevent pipe end damage and to prevent entrance of dirt, debris and moisture.

C. Handling: Use slings to handle valves and fire hydrants whose size requires handling by crane or lift. Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

WATER UTILITIES 33 10 00 - 5

Page 2354 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
D. During Storage: Use precautions for valves, including fire hydrants according to the following.
(1) Do not remove end protectors, unless necessary for inspection, then reinstall for storage.
(2) Protection from Weather: Store indoors and maintain temperature higher than ambient dew -point temperature. Store indoors and maintain temperature higher than ambient dew point temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.

E. Do not store plastic pipe and fittings in direct sunlight.

F. Protect pipe, fittings, flanges, seals and specialties from moisture, dirt and damage.

G. Protect linings and coatings from damage.

H. Handle precast boxes, vaults and other precast structures according to manufacturer's written instructions.

Protect imported bedding and backfill material from contamination by other materials.

1.09 COORDINATION
A. Coordinate connection to existing water mains with water utility supplying water.

B. Coordinate piping materials, sizes, entry locations, and pressure requirements with building domestic water distribution piping and fire protection piping.

PART 2 PRODUCTS

2.01 SMALL -SIZE SERVICE PIPES
C. Copper Pipe: Sizes 3/4 -inch through 2 -inch.
(1) Pipe and Fittings: ASTM B 88, Type K, seamless water tube, annealed. (2) Joints: Restrain by couplings.

D. PE Plastic Pipe: Sizes'/2-inch through 3 -inch.
(1) Pipe and Fittings: AWWA C901.
(2) Joints: Restrain with clamps or heat -fusion.

E. PVC Pipe: Sizes1/8-inch through 3 inch.
(1) Pipe and Fittings: ASTM D 1785, Schedule 40
(2) Joints: Restrain with solvent cement. Do not use threaded pipe.

WATER UTILITIES 33 10 00 - 6

Page 2355 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(7)
(3) Solvent Cement: ASTM D2564.

2.02 LARGE -SIZE SERVICE AND DISTRIBUTION PIPES
A. DIP: Sizes 4 -inch through 48 -inch.
(1) Pipe: AWWA C150 and C151.
(2) Fittings
(a) Standard: AWWA C110, sizes 4 -inch through 48 -inch. (b) Compact: AWWA C153, sizes 4 -inch through 24 -inch.

Pipe and Fitting Lining: Cement Mortar, AWWA C104.

Pipe and Fitting Coating: Asphaltic, AWWA C151 or C115.

Exterior Soil Corrosion Protection for Pipe and Fittings: Polyethylene encasement, AWWA C105.

Unrestrained Joints:
(a) Push -On Bell and Spigot Joint: AWWA C111.
(b) Mechanical Joint: AWWA C111.

Restrained Joints:
(a) Flanged Joint: AWWA C115.
(b) Push -On Bell and Spigot Joint: AWWA C111 with "Field Lok Gasket," sizes 4 -inch through 24-inch;"TR Flex," sizes 4 -inch through 64 -inch; both by U. S. Pipe (Birmingham AL) (TeI.205- 254-7442) or approved equal. "Megalug" restraint harness, Ebaa Iron (Eastland TX) (Tel 800-443-1716) or approved equal. (c) Mechanical Joint: AWWA C111 with "Mega Lug," sizes 3 -inch through 48 -inch. Ebaa Iron (Eastland TX) (Tel 800-443-1716) or approved equal.
(d) Grooved and Shouldered Joints: AWWA C150, AWWA C151 and AWWA C606. 24 -inch maximum size.
(8) Couplings:
(a) Plain End Pipe to Plain End Pipe: Ductile iron or steel bolted couplings, manufacturer's shop coating with low alloy steel bolts and nuts. Steel couplings to conform to AWWA C219. Smith -Blair, Inc, (Texarkana, AR) (Tel. 501-773-5127), Dresser (Bradford, PA) (Tel. -814-368-3131) or approved equal.
(b) Plain End Pipe to Flanged Pipe: 1) Ductile iron or steel bolted WATER UTILITIES 33 10 00 - 7

Page 2356 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
flanged coupling adapters, manufacturer's shop coating with low alloy steel bolts and nuts. Steel flanged couplings to conform to AWWA C219. Smith -Blair, Inc, (Texarkana, AR) (Tel. 501-773- 5127), Dresser (Bradford, PA) (Tel. -814-368-3131) or approved equal; or 2) restrained flange adapter, "Megaflange," sizes 3 -inch through 36 inch, Ebaa Iron (Eastland TX ) (Tel 800-443-1716) or approved equal.

B. PE Pipe: Sizes 4 -inch through 64 -inch.
(1) Pipe and Fittings: AWWA C906.
(2) Joints:
(a) Thermal Butt Fusion: AWWA C906 and pipe manufacturer's recommendations.
(b) Flanged joining: AWWA C906 and pipe manufacturer's
recommendations.
(c) Other: Check with pipe manufacturer.

C. PVC Pipe: Sizes 4 -inch through 48 -inch.
(1) Pipe:
(a) 4 -inch through 12 -inch: AWWA C900.
(b) 14 -inch through 48 -inch: AWWA C905.
(2) Fittings: DI conforming to 2.2A above.
(3) Unrestrained Joints:
(a) Push -On Bell and Spigot Joint: AWWA C900.
(4) Restrained Joints:
(a) Push -On Bell and Spigot Joint: Harness assembly as manufactured by Ebaa Iron (Eastland, Tx) (Tel. 800-433-1716) or approved equal.
(b) Plain End PVC to DI Mechanical Joint: Ebaa Iron (Eastland, Tx) (Tel. 800-433-1716) or approved equal.
(5) Steel or Ductile Iron Couplings:
(a) Plain End Pipe to Plain End Pipe: Ductile iron or steel bolted couplings, manufacturer's shop coating with low alloy steel bolts and nuts. Steel couplings to conform to AWWA C219. Smith -Blair, Inc, (Texarkana, AR) (Tel. 501-773-5127), Dresser (Bradford, PA) (Tel. -814-368-3131) or approved equal.
(b) Plain End Pipe to DI or Steel Flanged Pipe: Ductile iron or steel WATER UTILITIES 33 10 00 - 8

Page 2357 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
bolted flanged coupling adapters, manufacturer's shop coating with low alloy steel bolts and nuts. Steel flanged couplings to conform to AWWA C219. Smith -Blair, Inc, (Texarkana, AR) (Tel. 501-773-5127), Dresser (Bradford, PA) (Tel. -814-368-3131) or approved equal.
(6) PVC Couplings
(a) Unrestrained Plain End to Plain End Pipe: AWWA C900, as manufactured by CertainTeed (Valley Forge, PA) (Tel. 610 341- 6820) or approved equal.
(b) Restrained Plain End to Plain End Pipe: AWWA C900, "Certa- Lock" as manufactured by CertainTeed (Valley Forge, PA) (Tel. 610 341-6820) or approved equal.

D. Cement Mortar Lined and Coated Steel Pipe: 6 -inch and larger. (1) Pipe: AWWA C200 and AWWA M11.
(2) Special Sections and Fittings: AWWA C200, C207, C208 and AWWA M11 for all bends, tees, nozzles, closures, etc.
(3) Flanges: AWWA C207. Includes blind flanges.
(4) Linings and Coatings for Pipe, Special Sections and Fittings: Cement Mortar Lining and Coating: AWWA C205.
(a) Liquid Epoxy Lining and Coating: AWWA C210.
(b) Fusion Bonded Epoxy Lining and Coating: AWWA C213.
(c) Coal -Tar Lining and Coating: AWWA C203.
(d) Cold -Applied Tape Coatings, Piping: AWWA C214.
(e) Cold -Applied Tape Coatings, Specials, Connection and Fittings:

AWWA C209.
(f)
(g)
Cold Applied Petrolatum Tape and Petroleum Wax Tape Coatings for the Exterior of Special Sections, Connections, and Fittings for Buried or Submerged Steel Water Pipelines.

Aboveground Pipe Coatings: AWWA C218.]
(5) Non -Restrained Joints: AWWA M11.
(a) Rubber Gasket: Carnegie -shape rubber gasket as indicated. (6) Restrained Joints: AWWA M11. Where a flanged joint, butt strap or coupling are not indicated, either restrained joint a, or b, as follows, is acceptable, but the selected joint shall be used throughout the project. (a) Rubber Gasket: Carnegie -shape rubber gasket with field welded WATER UTILITIES 33 10 00 - 9

Page 2358 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(7)
restraint bar as indicated.
(b) Field Lap Welded Slip Joint: As indicated.
(c) Field Welded Butt Strap: As indicated.
(d) Flanged Joint: AWWA C207 with Type 316L stainless steel bolts and nuts as indicated.

Joint Coating for Cement Mortar Lined and Coated Steel Pipe:
(a) Field Joint Encasement: Cement mortar contained in fabric lined with closed cell polyethylene foam as indicated. Attach fabric to pipe with Type 316L stainless steel straps as indicated. Closed cell polyethylene foam encasement shall be by Industrial Specialties (Fullerton, CA) (Tel. 800-638-8127) or approved equal. (8) Non -Restrained Flexible Couplings: AWWA C219, Smith Blair, Inc (Texarkana, TX) (Tel. 501-773-5127), Number 411 or approved equal, with factory applied fusion -bond epoxy coating and Type 316L stainless steel bolts and nuts.
(9) Restrained Flexible Couplings: Non -restrained flexible coupling supplemented with a restraining harness as indicated and as follows:
(a) Restraining harness design by Contractor's pipe manufacturer using criteria presented in Section 13.10 of AWWA M11.
(b) Space harness -lugs and tie bolts equally around the pipe. (c)
Type 316L stainless steel harness tie bolts and nuts.
(d) Design and dimensions of harness lugs to be modified from that shown in AWWA M11, as necessary, to provide additional height to clear the coupling.
(10) Field Coating of Coupling Assemblies: Apply either of the following flexible tape and mastic or putty coating systems to the all non -restrained or restrained flexible steel couplings.
(a) Denso Coating System — Denso North American, Inc., (Houston, TX), (Tel 281-821-3355).
(b) Trenton Coating System — Allied Utility Products, (Livermore, CA) (Tel. 510-484-4007 or 510-373-7400).

2.03 HIGH DEFLECTION FITTINGS/BALL JOINTS
A. Plain End Pipe: Xtra Flex Restrained Joint High Deflection Fittings, 4 -inch through 24 -inch, U. S. Pipe, (Birmingham, AL) (Tel. 205-254-7442) or approved equal.

B. Mechanical or Flanged Joint: Flex 900, 4 -inch through 12 -inch, Ebaa Iron Sales, (Eastland, TX) (Tel. 800-433-1716) or approved equal.

WATER UTILITIES 33 10 00 -10

Page 2359 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2.04 EXPANSION JOINTS
A. TR Flex Joints: TR Flex Telescoping Sleeve, 4 -inch through 64 inch, U. S. Pipe, (Birmingham, AL) (Tel. 205-254-7442).

B. Mechanical or Flanged Joint: Ex -Tend 200, 4 -inch through 36 -inch, EBAA Iron Sales, (Eastland, TX) (Tel. 800-433-1716) or approved equal.

2.05 FLEXIBLE EXPANSION JOINTS
A. Plain End to Plain End Pipe: "Xtra Flex," sizes 4 -inch through 24 -inch, U. S. Pipe, (Birmingham AL) (Tel. 205-254-7442) or equal.

B. Flanged or mechanical Joint: "Flex -Tend," sizes 3 -inch through 48 -inch, Ebaa Iron (Eastland TX) (Tel. 800-433-1716) or equal.

C. Flanged Joint: Starflex, Series 500, Star Pipe Products, (Tel. 800-999-3009) or equal.

2.06 GATE VALVES
A. Provide on lines 10 -inch and smaller.

B. Valves, 3 -Inch through 20 -Inch: AWWA C509, resilient -seated, non -rising stem, gray or ductile -iron body and bonnet, with bronze or gray or ductile -iron gate, bronze stem and square stem operating nut unless noted otherwise. All bolts, nuts and washers, except operating nut, shall be stainless steel. Stem operating nut to be 2 -inches square and open counter -clockwise. Stem extensions shall be installed to bring the stem operating nut to within 2 -feet of finish grade where the depth from finish grade to the stem operating nut exceeds 4 -feet. Equip valves in pump stations and other interior or vault installations with hand -wheels. Provide protective epoxy interior and exterior coating according to AWWA C550 and manufacturer's recommendations.

C. Service Line Valves and Fittings, 2 -Inch and Smaller: AWWA C800 D. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:

Mueller Company (Decatur, IL) (TeI.800-423-1323).

M&H Valve Company (Anniston, AL) (Tel. 205-237-3521).

Crane Company (New York, NY).

E. Valve Box and Cover: 9 -inch minimum diameter PCC box with extensions of length required for depth of bury of valve, and cast iron or ductile iron cover with lettering "WATER". Both the box and the cover shall be rated for AASHTO H20 loading.

2.07 BUTTERFLY VALVES
A. Provide on lines larger than 10 -inch.

WATER UTILITIES
33 10 00-11

Page 2360 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Valves, 3 -Inch through 72 -Inch: AWWA C 504, rubber seated, Class 150B cast iron body, cast or ductile iron discs, stainless steel shafts, adjustable field replaceable rubber seats mating against stainless steel seat rings and field - replaceable seals. Flanged or mechanical joint end connections. No wafer type valves allowed. Traveling nut type valve actuators designed for buried service unless noted otherwise. All bolts, nuts and washers, except wrench nut, shall be stainless steel. Wrench nut to be 2 -inches square and open counter -clockwise.

Stem extensions shall be installed to bring the wrench nut to within 2-feeet of finish grade where the depth from finish grade to the wrench nut exceeds 4 -feet.

Equip valves in pump stations and other interior or vault installations with hand - wheels. Provide protective epoxy interior and exterior coating according to AWWA C550 and manufacturer's recommendations.

C. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:
(1) Mueller Company (Decatur, IL) (TeI.800-423-1323).
(2) M&H Valve Company (Anniston, AL) (Tel. 205-237-3521). (3) Crane Company (New York, NY).

D. Valve Box and Cover: 9 -inch minimum diameter PCC box with extensions of length required for depth of bury of valve, and cast iron or ductile iron cover with lettering "WATER". Both the box and the cover shall be rated for AASHTO H20 loading.

2.08 AIR RELEASE, AIR/VACUUM AND COMBINATION AIR VALVES A. AWWA C512, specific type of valve, size, details and valve box as indicated.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:
(1) Apco Valves, Valve and Primer Corporation (Schaumburg, IL) (Tel. 708- 529-9000).
(2) Crispin Valve (Berwick, PA) (Tel. 800-247-8258).

2.09 BLOW -OFF VALVES
A. Blow -off valve assemblies, details and boxes as indicated.

2.10 SWING CHECK VALVES
A. Valves 2 -Inch through 24 -Inch: AWWA C508, details as indicated.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:

WATER UTILITIES 33 10 00 -12

Page 2361 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Mueller Company (Decatur, IL) (TeI.800-423-1323).
(2) M&H Valve Company (Anniston, AL) (Tel. 205-237-3521).

2.11 BALL VALVES
A. Valves 6 -Inch through 48 -Inch: AWWA C507, details as indicated.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:
(1) Crane Company (New York, NY).

2.12 PRESSURE -REGULATING VALVES
A. Valve: Automatic, pilot -operated, cast-iron body with interior coating according to AWWA C550. 250 -psi Working -pressure, bronze pressure -reducing pilot valve and tubing, and means for discharge pressure adjustment. Details as indicated.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:

Cla-Val Company (Newport Beach, CA) (Tel. 714-548-2201).

Bermad (Porterville, CA) (Tel. 209-781-6630).

Ames Company (Woodland, CA) (Tel. 916-666-2493).

2.13 FLOW -REGULATING VALVES
A. Valve: Automatic, pilot -operated, cast-iron body with interior coating according to AWWA C550. 250 -psi working -pressure, bronze pressure -reducing pilot valve and tubing, and means for flow adjustment. Details as indicated.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:
(1) Cla-Val Company (Newport Beach, CA) (Tel. 714-548-2201). (2) Bermad (Porterville, CA) (Tel. 209-781-6630).
(3) Ames Company (Woodland, CA) (Tel. 916-666-2493).

2.14 SERVICE CONNECTIONS AND WATER METERS
A. Service connections and water meter details and boxes as indicated.

2.15 FIRE HYDRANTS
A. Wet Barrel: AWWA C503, details as indicated.

WATER UTILITIES 33 10 00 -13

Page 2362 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Dry Barrel: AWWA C502, details as indicated.

2.16 REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER
A. Provide as indicated and as required by State or local agency.

B. General: AWWA C511, with OS gate valve on inlet and outlet, and strainer on inlet. Include test cocks and pressure -differential relief valve with ASME A112.1.2 air gap fitting located between 2 positive -seating check valves for continuous - pressure application.

C. Body:
(1) 2 -Inch and Smaller: Bronze with threaded ends.
(2) 2 -1/2 -Inch and Larger: Bronze, cast iron steel, or stainless steel with flanged ends.

D. Interior Lining: AWWA C550, epoxy coating for cast iron or steel bodies.

E. Interior Components: Corrosion -resistant materials.

F. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:

Cla-Val Company (Newport Beach, CA) (Tel. 714-548-2201).

Ames Company (Woodland, CA) (Tel. 916-666-2493).

Febco, CMB Industries, Inc. (Fresno, CA) (Tel. 559-252-0791).

Hersey Products, Inc. (Dedham, MA) (Tel. 617-326-9400).

2.17 DOUBLE CHECK DETECTOR ASSEMBLY
A. FM approved or UL listed, with OS&Y gate valve on inlet and outlet, and strainer on inlet. Include two positive -seating check valves and test cocks, and bypass with displacement -type water meter, valves, and double-check backflow preventer, for continuous pressure application.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:
(1) Cla-Val Company (Newport Beach, CA) (Tel. 714-548-2201). (2) Ames Company (Woodland, CA) (Tel. 916-666-2493).
(3) Febco, CMB Industries, Inc. (Fresno, CA) (Tel. 559-252-0791). (4) Hersey Products, Inc. (Dedham, MA) (Tel. 617-326-9400).

WATER UTILITIES 33 10 00 -14

Page 2363 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2.18 POST INDICATOR VALVE
A. General: UL 789, FM approved, vertical -type, cast-iron body with operating wrench extension rod, and adjustable cast-iron barrel of length required for depth of bury of valve. Review fire department connection with agency having jurisdiction. Check hose threads and all sizes with fire department.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Project include, but are not limited to, the following:
(1) Mueller Co. (Decatur, IL) (TeI.800-423-1323).
(2) Clow Corporation (Oskaloosa, IA).

2.19 FIRE DEPARTMENT CONNECTION
A. Exposed, Freestanding Fire Department Connection: UL 405, cast brass body with threaded inlets according to NFPA 1963 and matching local fire department hose threads and threaded bottom outlet. Include lugged caps, gaskets and chains; lugged swivel connections and drop clapper for each hose -connection inlet; 18 -inch high brass sleeve; and round escutcheon plate. Four 2 -1/2 -inch NPS inlets and 6 -inch NPS outlet.

2.20 UNDERGROUND VAULTS/PITS
A. General: Portland cement concrete, precast or cast -in -place as indicated.

B. Portland Cement Concrete and Reinforcing Steel: Section 32 05 23 — Cement and Concrete for Exterior Improvements.

C. Access Openings: As indicated.

D. External Load: Earth load plus AASHTO H20 live load if located in paved areas.

E. Lids: Bolt down type.

2.21 TRACER WIRE
A. General: Minimum #12 AWG stranded copper wire with blue THW, THWN, or THHN rated insulation.

2.22 WARNING TAPE
A. General: Non -detectable 3 -inch warning tape made of solid blue film with continuously printed black -letter message reading "CAUTION —WATER LINE BURIED BELOW."

2.23 PCC THRUST BLOCKS
A. Portland Cement Concrete and Reinforcing Steel: Section 32 05 23 — Cement and Concrete for Exterior Improvements.

WATER UTILITIES 33 10 00 -15

Page 2364 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
PART 3 EXECUTION

3.01 PIPE INSTALLATION
B. General: Install pipe, fittings, and appurtenances utilizing best practices, manufacturer's instructions, and in accordance with the following:
(1) DIP: AWWA M41 and AWWAC600.
(2) PVC pipe: AWWA M23 and AWWA C605.
(3) Steel Pipe: AWWA M11.

C. Pipe Depth and Trench Configuration: Conform to elevations, profiles and typical trench section(s) indicated.

D. Excavation, Bedding, Backfill, and Compaction: Section 31 23 33 — Trenching and Backfilling.

E. Handling: Carefully handle during loading, hauling, unloading and placing operations to avoid breakage or damage. Use strap type slings for lifting and placing; no chains or hooks will be permitted. Comply with manufacturer's recommendations.

F. Laying: Before lowering pipe into the trench, remove all stakes, debris, loose rock and other hard materials from the bottom of the trench. Lay accurately in conformance with lines and grades indicated. Lay pipe on a bed of bedding material specified and prepared by handwork, dug true to grade. Furnish firm bearing for pipe throughout it's entire length with bell holes provided at the ends of each pipe length of sufficient size to permit making up the particular type of joint being used. Adjust pipe to line and grade by scraping away or filling and tamping material under the body of the pipe for the entire pipe length and not by blocking or wedging. After final positioning, hold pipe in place in trench with backfill material placed equally on both sides of the pipe at as many locations as required to hold the pipe section in place.

G. Curved Alignment: When necessary to conform to the alignment specifically indicated, lay pipe on a curved alignment by means of asymmetrical closure of joints or bending of the pipe barrel. If necessary, use shorter than the standard lengths of pipe to achieve curvature specified. Do not exceed the recommendations of the pipe manufacture for deflections at the joints or pipe bending.

H. Closure: Close open ends of pipes and appurtenance openings at the end of each days work or when work is not in progress.

3.02 CONNECTING TO EXISTING MAINS
A. Pressure Tap Connections: Perform in accordance with the requirements of the owner of the system being tapped. Maintain a positive pressure flow from the main being tapped to the tapping device to flush plastic chips, metal ribbons, etc. into the tapping devise and not into the pipe being tapped.

WATER UTILITIES 33 10 00 -16

Page 2365 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
B. Other Connections: As indicated and in accordance with the requirements of the owner of the line being connected to.

3.03 ANCHORAGE INSTALLATION
A. Mechanically Restrained Joints: Install where indicated for lengths indicated in accordance with manufacturer's instructions.

B. PCC Thrust Blocks: Install where required and as indicated. Bearing area indicated is to be against undisturbed earth. Allow a minimum of 24 -hours curing time before introducing water into the pipeline and allow a minimum of 7 -days curing time before pressure testing.

3.04 HIGH DEFLECTION FITTINGS/BALL JOINTS, EXPANSION JOINTS, AND FLEXIBLE

EXPANSION JOINTS
A. Install as indicated and in accordance with the manufacturers recommendations.

3.05 VALVE INSTALLATION
A. Install all valves in accordance with the manufacturer's instructions and the following:
(1) General:
(a) Gate Valves: Appendix A of AWWA C509.
(b) Butterfly Valves: Appendix A of AWWA C504.
(2) Joints:
(a) Valves on DI, PE and PVC Pipe: Mechanical joint valves for buried locations. Flanged -end valves for installation in vaults/pits. (b) Valves on Steel Pipe: As indicated for buried locations. Flanged - end valves for installation in vaults/pits.

3.06 SERVICE CONNECTIONS INSTALLATION
A. Install as indicated and in accordance with the requirements of the owner of the system.

3.07 WATER METER INSTALLATION
A. Install as indicated and in accordance with the requirements of the owner of the system.

3.08 FIRE HYDRANT INSTALLATION
A. Install as indicated and in accordance with the requirements of the owner of the system and the fire department.

3.09 REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER INSTALLATION WATER UTILITIES 33 10 00 - 17

Page 2366 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. Install as indicated and in accordance with the requirements of the owner of the system and the local health department requirements.

3.10 DOUBLE CHECK DETECTOR ASSEMBLY INSTALLATION
A. Install as indicated and in accordance with the requirements of the owner of the system and the fire department.

3.11 POST INDICATOR VALVE INSTALLATION
A. Install as indicated and in accordance with the requirements of the owner of the system and the fire department.

3.12 FIRE DEPARTMENT CONNECTION INSTALLATION
A. Install as indicated and in accordance with the requirements of NFPA #24 and the fire department.

3.13 UNDERGROUND VAULT/PIT INSTALLATION
A. Install as indicated.

B. Excavation and Backfill: Section 31 23 33 — Trenching and Backfilling.

3.14 TRACER WIRE INSTALLATION
A. Install on trench bottom under the vertical projection of the pipe to protect it in all installations.

B. Form a mechanically and electrically continuous line throughout the pipeline, extending to the nearest valve or other pipeline appurtenance designated by the owner of the system or the Owner. Extend the wire up the outside of the valve box/riser and cut a hole that is 8 -inches from the top, extend a 12 -inch wire lead to the inside of the box. At other pipeline appurtenances, designated by the owner of the system or the Owner, terminate the 12 -inch wire lead inside the enclosure.

C. Splice wire with a splicing device consisting of and electro-tin plated seamless copper sleeve conductor. Install as recommended by the manufacturer. Wrap splices and damaged insulation with electrician's tape.

3.15 WARNING TAPE INSTALLATION
A. Install tape approximately 1 -foot above and along the centerline of the pipe.

B. Where tape is not continuous, lap tape ends a minimum of 2 -feet.

3.16 HYDROSTATIC PRESSURE AND LEAKAGE TEST
A. General:
(1) Provide all necessary materials and equipment, including water. (2) Backfill all trenches sufficient to hold pipe firmly in position.

WATER UTILITIES 33 10 00 - 18

Page 2367 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(3) Allow time for thrust blocks to cure prior to testing. (4) Flush all pipes prior to testing to remove all foreign material. (5) Perform pressure and leakage test concurrently.
(6) Test pressure: See Subsection titled "System Performance Requirements."
(7) Apply test pressure by means of a pump connected to the pipe. (8) Base test pressure on the elevation of the lowest point in the line. (9) Fill each closed valve section or bulk -headed section slowly. Expel air from section being tested by means of permanent air vents installed at high points or by means of temporary corporation cocks installed at such points. Remove and plug the temporary corporation cocks at the conclusion of the test.
(10) Allow water to stand in the pipe for 24 hours before test pressure is applied.
(11) Allow the system to stabilize at the test pressure before conducting the leakage test.
(12) Do not operate valves in either the opening or closing direction at differential pressures above the valves rated pressure. (13) Maintain test pressure as specified for type of pipe being tested. (14) Pressure Test: Examine any exposed pipe, fittings, valves, hydrants and joints during the test, if no leaks are observed the section of line has passed the pressure test. If leaks are observed, repair any damaged or defective pipe, fittings, valves, or hydrants, and repeat the pressure test. (15) Leakage Test: Perform as specified hereafter for the type of pipe being installed.

B. DIP Leakage Test: Perform in accordance with AWWA C600. Selected requirements of AWWA C600 are repeated as follows:
(1) Maintain the test pressure, +/- 5 psi, for a minimum of two hours. (2) No piping will be accepted if the leakage is greater than that determined by the following formula:

L = (S x D x P1/2)/133,200
L = Allowable leakage, gallons per hour.

S = Length of pipe tested, feet.

D = Nominal diameter of pipe, inches.

WATER UTILITIES 33 10 00 - 19

Page 2368 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
P = Average test pressure during the leakage test, pounds per square inch (gauge).

C. PE Pipe Leakage Test:
(1) Apply the test pressure and allow the pipe to stand, without makeup pressure, for sufficient time to allow for diametric expansion or pipe stretching to stabilize, approximately two to three hours. (2) After the above stabilization has occurred, return the section being tested to the test pressure. Hold the test pressure for one to three hours. If the pressure in the test section drops, and it is determined the drop may be the result of expansion resulting from increasing temperature, a limited amount of additional water may be added to bring the pressure back to the test pressure. Allowable amounts of make-up water, to compensate for expansion due to increasing temperature, are as shown in the following table. Make-up water is only allowed during this final test period and not during the initial stabilization described in the previous paragraph.

If the additional water added is less than the allowable shown in the table and there are no visual leaks or significant pressure drops, the tested section passes the test.
(3)
Nominal Allowance for Expansion
(U.S. Gals./100 Feet of Pipe)
Pipe 1 -Hour 2 -Hour 3 -Hour
Size Test Test
(in.)
Test
3 0.10 0.15 0.25
4 0.13 0.25 0.40
6 0.30 0.60 0.90
8 0.50 1.0 1.50
10 0.75 1.3 2.1
11 1.0 2.0 3.0
12 1.1 2.3 3.4
14 1.4 2.8 4.2
16 1.7 3.3 5.0
18 2.2 4.3 6.5
20 2.8 5.5 8.0
22 3.5 7.0 10.5
24 4.5 8.9 13.3
28 5.5 11.1 16.8
32 7.0 14.3 21.5
36 9.0 18.0 27.0
40 11.0 22.0 33.0
48 15.0 27.0 43.0
WATER UTILITIES 33 10 00 - 20

Page 2369 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
D. PVC Pipe Leakage Test: Perform in accordance with AWWA M23. Selected requirements of AWWA M23 are repeated as follows:
(1) Maintain the test pressure, +I- 5 psi, for a minimum of two hours. (2) No piping will be accepted if the leakage is greater than that determined by the following formula:

L = (N x D x P1/2)/7,400
L = Allowable leakage, gallons per hour.

N = Number of joints in the length of the pipeline tested.

D = Nominal diameter of pipe, inches.

P = Average test pressure during the leakage test, pounds per square inch (gauge).

E. Cement Mortar Lined and Coated Steel Pipe Leakage Test: Perform in accordance with AWWA M11. Selected requirements of AWWA M11 are repeated as follows:
(1) Maintain the test pressure, +I- 5 psi, for a minimum of two hours. (2) There shall be no significant leakage for pipe with welded joints or mechanical couplings.
(3)
For pipe joined with O-ring rubber gaskets, a leakage of 25 gallons per inch of diameter per mile per 24 -hours is allowed.

3.17 DISINFECTION
A. All New Pipelines shall be disinfected in accordance with one of the three methods specified in AWWA C651 and the following:
(1) Disinfect after pressure and leakage test have been performed and accepted.
(2) The method used shall be at the Contractor's option, unless specified by the owner of the water system.
(3)
Engage the services of a commercial testing laboratory, approved by the owner of the water system, to perform the bacteriological tests specified in Section 5.1 of AWWA C651. Direct the testing laboratory to send the original report of the bacteriological testing to the owner of the water system. Should the laboratory report show that any sample taken was not acceptable, repeat the sterilization process shall until a satisfactory sterilization is accomplished.
(4) Lawfully dispose of the chlorinated water.

WATER UTILITIES 33 10 00 - 21

Page 2370 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
END OF SECTION 33 10 00
WATER UTILITIES 33 10 00 - 22

Page 2371 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 33 30 00

SANITARY SEWERAGE UTILITIES
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Roadway and/or site sanitary gravity sewers and force mains up to 5 feet of any on -site building.

1.02 RELATED SECTIONS
A. Section 31 23 33 — Trenching and Backfilling.

B. Section 32 05 23 — Cement and Concrete for Exterior Improvements.

C. Section 33 05 16 - Utility Structures.

1.03 RELATED DOCUMENTS
A. AASHTO:
(1) M 252: Corrugated Polyethylene Drainage Tubing.
(2) M 294: Corrugated Polyethylene Pipe, 12 to 24 -inch Diameter.

B. ASTM:
(1) A 615/A615M: Deformed and Billet -Steel Bars for Concrete Reinforcement.
(2) A 674 Practice for Polyethylene Encasement for Ductile Iron Pipe for Water and Other Liquids.

C 443: Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets.
(4) C 1173: Flexible Transition Couplings for Underground Piping Systems. (5) D 1785: Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.
(6) D 2235: Solvent Cement for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe and Fittings.
(7) D 2321: Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity Flow Applications.
(8) D 2564: Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems.

D 2751: Acrylontrile-Butadiene-Styrene (ABS) Sewer Pipe and Fittings. (3)
(9)
SANITARY SEWERAGE UTILITIES 33 30 00 -1

Page 2372 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(10) D 3034: Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings. (11) D 4101: Propylene Injection and Extrusion Materials. (12) F 477: Elastomeric Seals (Gaskets) for Joining Plastic Pipe. (13) F 656: Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings.
(14) F 679: Poly(Vinyl Chloride) (PVC) Large Diameter Plastic Gravity Sewer Pipe and Fittings.
(15) F-1336: Poly(Vinyl Chloride) (PVC) Gasket Sewer Fittings.

C. AWWA:
(1) C104: Cement Mortar Lining for Ductile -Iron Pipe and Fittings for Water. (2) C105: Polyethylene Encasement for Ductile -Iron Pipe Systems. (3) C110: Ductile -Iron and Gray -Iron Fittings, 3 In. Through 48 In. (76 mm Through 1,219 mm) for Water.
(4) C111: Rubber -Gasket Joints for Ductile -Iron Pressure Pipe and Fittings. (5) C150: Thickness design of Ductile Iron Pipe.
(6) C151: Ductile -Iron Pipe, Centrifugally Cast, for Water. (7) C153: Ductile -Iron Compact Fittings for Water Service. (8) M41: Ductile Iron Pipe and Fittings.

D. Caltrans Standard Specifications.
(1) Section 65, Reinforced Concrete Pipe.

E. California Building Code.

F. Section 1806A.11 — Pipes and Trenches.

G. California Plumbing Code.

1.04 DEFINITIONS
A. AASHTO: American Association of State Highway and Transportation Officials.

B. ABS: Acylonitrile-butadiene-styrene.

C. ASTM: American Society for Testing Materials.

D. AWWA: American Water Works Association.

E. HDPE: High -density polyethylene.

SANITARY SEWERAGE UTILITIES 33 30 00 - 2

Page 2373 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
F. PE: Polyethylene.

G. DIP: Ductile iron pipe.

H. PVC: Polyvinyl Chloride.

RCP: Reinforced concrete pipe.

J. NPS: Nominal pipe size.

1.05 SUBMITTALS
A. Follow submittal procedures outlined in Section 01 33 00 - Submittal Procedures.

B. Product data for the following:
(1) Piping materials and fittings.
(2) Special pipe couplings.
(3) Joint sealants.
(4) Sewage air relief valves.

C. Shop drawings: Include plans, elevations, details and attachments for the following:
(1) Force main piping access openings.

D. Design Mix Reports and Calculations: For each class of cast -in -place concrete.

E. Field Test Reports: Indicate and interpret test results for compliance with performance.

1.06 DELIVERY, STORAGE AND HANDLING
A. Do not store plastic pipe and fittings in direct sunlight.

B. Protect pipe, fittings, and seals from dirt and damage.

C. Handle precast concrete pipe and other precast structures according to manufacturer's written instructions.

D. Protect imported bedding and backfill material from contamination by other materials.

PART 2 PRODUCTS

2.01 PIPING MATERIALS FOR GRAVITY FLOW
A. ABS Pipe and Fittings: 4 -inch through 12 inch, ASTM D 2751, SDR 35. Bell and spigot joints.

SANITARY SEWERAGE UTILITIES 33 30 00 - 3

Page 2374 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477.

B. DIP: Sizes 4 -inch through 48 -inch.
(1) Pipe: AWWA C150 and C151.
(2) Pressure Class: Minimum pressure class for size indicated. (3) Fittings
(a) Standard: AWWA C110, sizes 4 -inch through 48 -inch. (b) Compact: AWWA C153, sizes 4 -inch through 24 -inch. (4) Pipe and Fitting Lining: Cement Mortar, AWWA C104.
(5) Pipe and Fitting Coating: Asphaltic, AWWA C151 or C115. (6) Exterior Soil Corrosion Protection for Pipe and Fittings: Polyethylene encasement, AWWA C105.
(7) Joints:
(a) Push -On Bell and Spigot Joint: AWWA C111.
(b) Mechanical Joint: AWWA C111.
(c) Flanged joint. AWWA C115.

C. PE Pipe and Fittings (HDPE): 4 -inch through 10 -inch, AASHTO M252 Type S, smooth interior and corrugated exterior. Bell and spigot joints. (1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Couplings: AASHTO M 252, corrugated band type, engage a minimum of 4 corrugations, 2 on each side of pipe joint.

D. PE Pipe and Fittings (HDPE): 12 -inch through 48 -inch, AASHTO M 294.Type S, smooth interior and corrugated exterior. BeII and spigot joints. (1) BeII and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Couplings: AASHTO M 252, corrugated band type, engage a minimum of 4 corrugations, 2 on each side of pipe joint.

E. PVC Pipe:
(1) Pipe:
(a) 4 -inch through 15 -inch: ASTM D 3034, SDR 35. BeII and spigot joints.
(b) 18 inch through 36 -inch: ASTM F 679, T-1 wall. BeII and spigot joints.

SANITARY SEWERAGE UTILITIES 33 30 00 - 4

Page 2375 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Fittings:
(a) 4 -inch through 27 -inch: ASTM F 1336.
(b) 30 -inch through 36 -inch: ASTM D 3034, SDR 35
(3) Joint Gasket: Elastomeric seal, ASTM F 477.

F. Reinforced Concrete Pipe: Designated by Class, rubber gasketed joints, Type II or V cement.
(1) Circular Reinforced Concrete Pipe: Caltrans Standard Specification Section 65-1.02A(1). Class I I I.
(2) Oval shaped (Elliptical) Reinforced Concrete Pipe: Caltrans Standard Specification Section 65-1.02B. Class HE -III and VE-III. (3)
Rubber Gasketed Joints: Caltrans Standard Specification Section 65-

1.06. 2.02 PIPING MATERIALS FOR FORCE MAINS
A. DIP: See Section 33 10 00 — Water Utilities.

B. PE Pipe: See Section 33 10 00 — Water Utilities.

C. PVC Pipe: See Section 33 10 00 — Water Utilities.

2.03 SPECIAL PIPE COUPLINGS
A. Gravity Piping: ASTM C 1173. Rubber or elastomeric sleeve and band assembly fabricated to match outside diameters of pipes to be joined.

B. Force Main piping: See Section 33 10 00 — Water Utilities.

2.04 MANHOLES AND CLEANOUTS
A. See Section 33 05 16 - Utility Structures.

2.05 SEWAGE AIR RELIEF VALVE ASSEMBLY FOR FORCE MAINS
A. General: As indicated.

2.06 THRUST BLOCKS FOR FORCE MAINS
A. General: Location, configuration bearing area, etc. as indicated.

B. Portland Cement Concrete: Section 32 05 23 — Cement and Concrete for Exterior Improvements.

PART 3 EXECUTION

3.01 GRAVITY PIPE INSTALLATION

SANITARY SEWERAGE UTILITIES
33 30 00 - 5

Page 2376 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. General: Install pipe, fittings, and appurtenances utilizing best practices, manufacturer's instructions, and in accordance with Section 6 and 7 of ASTM D 2321 for plastic pipe, Caltrans Standard Specification Section 65-1.07 for reinforced concrete pipe and chapter 11.3.3 of AWWA M41 for ductile iron pipe.

B. Pipe Depth and Trench Configuration: Conform to typical trench section(s) indicated.

C. Excavation, Bedding, Backfill, and Compaction: Section 31 23 33 — Trenching and Backfilling.

D. Handling: Carefully handle during loading, hauling, unloading and placing operations to avoid breakage or damage. Use strap type slings for lifting and placing; no chains or hooks will be permitted. Comply with the manufacturer's recommendations.

E. Laying: Before lowering pipe into the trench, remove all stakes, debris, loose rock and other hard materials from the bottom of the trench. Lay accurately in conformance with lines and grades indicated. Start laying the pipeline at the low end and proceed upstream. Lay bell and spigot pipe with the bell end facing upstream. Lay pipe on a bed prepared by handwork, dug true to grade. Furnish firm bearing for pipe throughout it's entire length with bell holes provided at the ends of each pipe length of sufficient size to permit making up the particular type of joint being used. Adjust pipe to line and grade by scraping away or filling and tamping material under the body of the pipe for the entire pipe length and not by blocking or wedging. After final positioning, hold pipe in place in trench with backfill material placed equally on both sides of the pipe at as many locations as required to hold the pipe section in place.

F. Curved Alignment: When necessary to conform to the alignment specifically indicated, lay pipe on a curved alignment by means of asymmetrical closure of joints or bending of the pipe barrel. Use shorter lengths of pipe than the standard length if necessary to achieve curvature specified. Do not exceed the recommendations of the pipe manufacture for deflections at the joints or pipe bending.

G. Closure: Close open ends of pipes and appurtenance at the end of each days work or when work is not in progress.

3.02 FORCE MAIN PIPE INSTALLATION
A. General: See Section 33 10 00 — Water Utilities.

3.03 SPECIAL PIPE COUPLINGS
A. General: Use where required to join piping and no other appropriate method is specified. Do not use instead of specified joining methods.

B. Installation: Per manufacturer's instructions.

3.04 AIR RELIEF VALVE ASSEMBLY INSTALLATION
A. General: Install as indicated.

SANITARY SEWERAGE UTILITIES 33 30 00 - 6

Page 2377 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3.05 TESTING OF GRAVITY PIPING MAINS
A. Obstructions: After backfilling and compacting, but before paving or other surface improvements, test sewer for obstructions either by rodding or by the sewer ball method. Provide for intercepting all grit, rocks and other flushed debris to keep debris from entering the existing system.

B. At the option of the Contractor, either the following hydrostatic or air test shall be performed.

C. Hydrostatic Test:
(1) Test after backfilling to finish grade or pavement structural section subgrade in paved areas.
(2) Test sewer mains between successive manholes by closing the lower end of the sewer main to be tested and the inlet sewer main of the upper manhole with stoppers.
(3)
Fill pipe and manholes with water to a point four feet below the ground surface of the upper manhole, but in no case less than four feet above the pipe invert. If ground water is present, the water surface at the upper manhole shall be at least four feet above the level of the ground water. (4) Fill piping at least one hour prior to testing.
(5) Test piping at least two hours by maintaining the head specified above with measured additions of water. The sum of these additions of water, in the two-hour test period, shall be the leakage amount.
(6) The maximum allowable head of water above any portion of sewer being tested shall be 15 -feet. Where the difference in elevation between successive manholes exceeds 15 -feet, a test tee shall be installed between manholes, and the testing shall be carried on between the tee and the manhole.
(7)
The allowable leakage shall not exceed 0.1 -gallons per minute per inch diameter, per 1000 -feet of sewer main being tested.
(8) If the leakage exceeds the above amount, determine the cause and remedy it prior to retesting.
(9)
If the leakage is less than the allowable, but leaks are observed, repair the observed leaks.

D. Air Test:
(1) Test after backfilling to finish grade or pavement structural section subgrade in paved areas.
(2) Apply to each length between adjacent manholes.
(3) Supply pressure gauge with minimum divisions of 0.10 -psi and with an accuracy of +/- 0.04 -psi. When requested by the Owner, provide SANITARY SEWERAGE UTILITIES 33 30 00 - 7

Page 2378 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
certification that the gauge has been tested for accuracy within the last six months by a reliable testing firm.
(4) Pressurize the test section to 3.5 -psi, and then hold the pressure above

3.0 -psi during a saturation period of at least 5 minutes. At the end of the saturation period, note the pressure, which must be a minimum of 3.0 -psi, and begin the timed period. If the pressure drops 0.5 -psi in less than the time given in the following table the section of pipe has not passed the test.
(5) PipeSize Minimum Time Allowed
for Pressure to Drop 0.5 -PSI
4"
6"
8"
10"
12"
15"
18"
21"
24"
27"
30"
36"
42"
48"
54"
125 seconds
185 seconds
245 seconds
310 seconds
370 seconds
460 seconds
555 seconds
10 minutes
12 minutes
14 minutes
16 minutes
18 minutes
20 minutes
23 minutes
26 minutes
(6) If the time for the pressure to drop 0.5 -psi is 125% or less of the time indicated, the line shall immediately be re -pressurized to 3.0 -psi and the test repeated. If, during the 5 -minute saturation period, the pressure drops less than 0.5 -psi after the initial pressurization and air is not added, the section undergoing the test shall have passed.
(7)
If the test did not pass, find and repair the leak to the satisfaction of the Owner.
(8) When the prevailing ground water is above the line being tested the air pressure shall be increased 0.43 -psi for each foot the water table is above the invert of the pipe at the highest manhole.

3.06 TESTING OF LATERALS
A. At the option of the Contractor, either the following hydrostatic or air test shall be performed.

B. Hydrostatic Test:
(1) Test laterals before backfilling
(2) Plug lateral at its ends and fill with water through the cleanouts. (3) Maintain the water level in the cleanouts as high as possible throughout SANITARY SEWERAGE UTILITIES 33 30 00 - 8

Page 2379 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
the test period.
(4) One hour after filling with water, examine the lateral for leakage. (5) Repair all leaks to the satisfaction of the Owner.
(6) Do not backfill the trench until testing and repairs of the lateral are complete, and approved by the Owner.
(7)
Following approval of the Owner, remove all plugs, dispose of the water and complete the connection to the main.

C. Air Test
(1) Test after backfilling to finish grade or pavement structural section subgrade in paved areas.
(2) Test in accordance with subsection above titled "Testing of Gravity Piping Mains," paragraph titled "Air Test."

3.07 HYDROSTATIC AND LEAKAGE TESTING OF FORCE MAINS
A. General: Perform hydrostatic and leakage test in accordance with Section 33 10 00 — Water Utilities.

END OF SECTION 33 30 00
SANITARY SEWERAGE UTILITIES 33 30 00 - 9

Page 2380 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 33 40 00

STORM DRAINAGE UTILITIES
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. Roadway and/or site storm drainage up to 5 -feet of any on -site building.

1.02 RELATED SECTIONS
A. Section 31 23 33 — Trenching and Backfilling.

1.03 RELATED DOCUMENTS
A. AASHTO:
(1) M 252: Corrugated Polyethylene Drainage Tubing.
(2) M 294: Corrugated Polyethylene Pipe, 12 to 24 -inch Diameter.

B. ASTM:
(1) A 74: Cast Iron Soil Pipe and Fittings.
(2) A 615/A615M: Deformed and Billet -Steel Bars for Concrete Reinforcement.
(3) C 443: Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets.
(4) C 564: Rubber Gaskets for Cast Iron Soil Pipe and Fittings. (5) C 1173: Flexible Transition Couplings for Underground Piping Systems. (6) D 1785: Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.
(7) D 2235: Solvent Cement for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe and fittings.
(8) D 2321: Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity Flow Applications.
(9) D 2564: Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems.
(10) D 2751: Acrylontrile-Butadiene-Styrene (ABS) Sewer Pipe and Fittings. (11) D 3034: Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings. (12) D 4101: Specifications for Propylene Injection and Extrusion Materials.

STORM DRAINAGE UTILITIES 33 40 00 -1

Page 2381 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(13) F 477: Elastomeric Seals (Gaskets) for Joining Plastic Pipe. (14) F 656: Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC)Plastic Pipe and Fittings.
(15) F 679: Specification for Poly(Vinyl Chloride) (PVC) Large Diameter Plastic Gravity Sewer Pipe and Fittings.
(16) F-1336: Poly(Vinyl Chloride) (PVC) Gasket Sewer Fittings.

C. AWWA:
(1) C104: Cement Mortar Lining for Ductile -Iron Pipe and Fittings for Water. (2) C105: Polyethylene Encasement for Ductile -Iron Pipe Systems. (3) C110: Ductile -Iron and Gray -Iron Fittings, 3 In. Through 48 In. (76 mm Through 1,219 mm) for Water.
(4) C111: Rubber -Gasket Joints for Ductile -Iron Pressure Pipe and Fittings. (5) C150: Thickness design of Ductile Iron Pipe.
(6) O151: Ductile -Iron Pipe, Centrifugally Cast, for Water. (7) C153: Ductile -Iron Compact Fittings for Water Service. (8) M41: Ductile Iron Pipe and Fittings.

D. Caltrans Standard Specifications:
(1) Section 65, Reinforced Concrete Pipe.
(2) Section 66, Corrugated Metal Pipe.
(3) Section 70. Miscellaneous Facilities.
(4) Section 72, Slope Protection.

E. Caltrans Standard Plans:
(1) Plan O94A: Metal and Plastic Flared End Sections.
(2) Plan D94B: Concrete Flared End Sections.
(3) Plan D97A: Corrugated Metal Pipe Coupling Details No.1, Annular Coupling Band Bar and Strap and Angle Connection.
(4) Plan D97B: Corrugated Metal Pipe Coupling Details No. 2, Hat Band Coupler and Flange Details.
(5) Plan D97C: Corrugated Metal Pipe Coupling Details No. 3, Helical and Universal Couplers.

STORM DRAINAGE UTILITIES 33 40 00 - 2

Page 2382 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
Plan D97D: Corrugated Metal Pipe Coupling Details No. 4, Hugger Coupling Bands.

Plan D97E: Corrugated Metal Pipe Coupling Details No. 5, Standard Joint.

Plan D97F: Corrugated Metal Pipe Coupling Details No. 6, Positive Joint.

Plan D97G: Corrugated Metal Pipe Coupling Details No. 7, Positive Joints and Downdrains.
(10) Plan D98A: Slotted Corrugated Steel Pipe Drain Details. (11) Plan D98B: Slotted Corrugated Steel Pipe Drain Details.

F. California Building Code:

G. Section 1806A.11 — Pipes and Trenches.

H. Section 1133B.7.2 — Gratings.

California Plumbing Code.

1.04 DEFINITIONS
A. AASHTO: American Association of State Highway and Transportation Officials.

B. ABS: Acylonitrile-butadiene-styrene.

C. ASTM: American Society for Testing Materials.

D. AWWA: American Water Works Association.

E. CMP: Corrugated metal pipe.

F. DIP: Ductile iron pipe.

G. HDPE: High -density polyethylene.

H. NPS: Nominal pipe size.

PE: Polyethylene.

J. PVC: Polyvinyl chloride.

K. RCP: Reinforced concrete pipe.

1.05 SUBMITTALS
A. Follow submittal procedures outlined in Section 01 33 00 - Submittal Procedures.

B. Product Data Shop Drawings, Etc.: For the following:
(1) Piping materials and fittings.

STORM DRAINAGE UTILITIES 33 40 00 - 3

Page 2383 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Special pipe couplings.
(3) Polymer -concrete, channel drainage systems (trench drains). (4) Joint sealants.
(5) Plastic area drains.
(6) Precast concrete catch basins, inlets, curb inlets, and area drains, including frames and grates.
(7) Concrete, metal and plastic flared end sections.

C. Design Mix Reports and Calculations: For each class of cast in place concrete.

D. Field Test Reports: Indicate and interpret test results for compliance with performance.

1.06 DELIVERY, STORAGE AND HANDLING
A. Do not store plastic structures, pipe and fittings in direct sunlight.

B. Protect pipe, fittings, and seals from dirt and damage.

C. Handle precast concrete pipe and other precast structures according to manufacturer's written instructions.

D. Protect imported bedding and backfill material from contamination by other materials.

PART 2 PRODUCTS

2.01 PIPING MATERIALS
A. ABS Pipe and Fittings: Smaller than 4 -inch, ASTM D 2751, SDR 35. Solvent cement joints.
(1) Solvent Cement: ASTM D 2235.

B. ABS Pipe and Fittings: 4 -inch through 12 inch, ASTM D 2751, SDR 35. Bell and spigot joints.
(1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477.

C. Cast Iron Pipe and Fittings: Hub and spigot, 2 -inch through 15 -inch, ASTM A74, service class.
(1)
Gaskets: ASTM 564, rubber, compression type, thickness to match class of pipe.

D. Corrugated Metal Pipe and Fittings: Caltrans Standard Specification Section 66. (1) Bituminous Coating: Caltrans Standard Specification Section 66-1.03.

STORM DRAINAGE UTILITIES 33 40 00 - 4

Page 2384 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(2) Bituminous Lining: Caltrans Standard Specification Section 66-1.03. (3) Bituminous Pavings: Caltrans Standard Specification Section 66-1.03. (4) Corrugated Aluminum Pipe: Caltrans Standard Specification Section 66-

2. (5) Corrugated Steel Pipe: Caltrans Standard Specification Section 66-3. (6) Slotted Corrugated Steel Pipe: Caltrans Standard Specification Section 66-3.09.
(7) Details: Caltrans Standard Plans D97A, D97B, D97C, D97D, D97E, D97F, D97G, D98A and D98B.

E. DIP: Sizes 4 -inch through 48 -inch.
(1) Pipe: AWWA C150 and C151.
(2) Pressure Class: Minimum pressure class for size indicated. (3) Fittings:
(a) Standard: AWWA C110, sizes 4 -inch through 48 -inch. (b) Compact: AWWA C153, sizes 4 -inch through 24 -inch. (4) Pipe and Fitting Lining: Cement Mortar, AWWA C104.
(5) Pipe and Fitting Coating: Asphaltic, AWWA C151 or C115. (6) Exterior Soil Corrosion Protection for Pipe and Fittings: Polyethylene encasement, AWWA C105.
(7) Joints:
(a) Push -On Bell and Spigot Joint: AWWA C111.
(b) Mechanical Joint: AWWA C111.
(c) Flanged joint. AWWA C115.

F. Reinforced Concrete Pipe: Designated by Class, rubber gasketed joints. (1) Circular Reinforced Concrete Pipe: Caltrans Standard Specification Section 65-1.02A(1). Class III.
(2) Oval shaped (Elliptical) Reinforced Concrete Pipe: Caltrans Standard Specification Section 65-1.02B. Class HE -III and VE-III. (3) Reinforced Concrete Pipe Arch: Caltrans Standard Specification Section 65-1.020.

STORM DRAINAGE UTILITIES 33 40 00 - 5

Page 2385 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(4) Rubber Gasketed Joints: Caltrans Standard Specification Section 65-

1.06. G. PE Pipe and Fittings: 4 -inch through 10 -inch, AASHTO M 252 Type S, smooth interior and corrugated exterior. Bell and spigot joints. (1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Couplings: AASHTO M 252, corrugated band type. Engage a minimum of 4 corrugations, 2 on each side of pipe joint.

H. PE Pipe and Fittings: 12 -inch through 48 -inch, AASHTO M 294.Type S, smooth interior and corrugated exterior. Bell and spigot joints. (1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Couplings: AASHTO M 252, corrugated band type. Engage a minimum of 4 corrugations, 2 on each side of pipe joint.

PVC Pipe and Fittings -Smaller than 4 -Inch: ASTM D1785, Schedule 40. (1) Joints: Solvent Cement, ASTM D 2564. Include primer according to ASTM F656.

J. PVC Pipe and Fittings,4-Inch and Larger
(1) Pipe:
(a) 4 -inch through 15 -inch: ASTM D 3034, SDR 35. Bell and spigot joints.
(b) 18 inch through 36 -inch: ASTM F 679, T-1 wall. Bell and spigot joints.
(2) Fittings:
(a) 4 -inch through 27 -inch: ASTM F 1336.
(b) 30 -inch through 36 -inch: ASTM D 3034, SDR 35
(3) Joint Gasket: Elastomeric seal, ASTM F 477.

2.02 PIPE ANCHORS
A. Section 32 05 23 — Cement and Concrete for Exterior Improvements.

2.03 SPECIAL PIPE COUPLINGS
A. Plastic, Cast Iron and Ductile Iron Pipe: ASTM C 1173, rubber or elastomeric sleeve and band assembly fabricated to match outside diameters of pipes to be joined.

B. Reinforced Concrete Pipe: Portland cement concrete collar as indicated.

STORM DRAINAGE UTILITIES 33 40 00 - 6

Page 2386 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

2.04 CURB INLETS, CATCH BASINS, DROP INLETS, AREA DRAINS, ETC.

A. General: Size, shape, configuration, depth, etc. of structure and frame, grate, or cover shall be as indicated.

B. Precast Structure: Rate for AASHTO H20 loading in paved areas.

C. Steps: ASTM C 478 or AASHTO M 199. Manufacture from deformed, '/2 -inch steel reinforcement rod complying with ASTM A 615 and encased in polypropylene complying with ASTM D4101. Include pattern designed to prevent lateral slippage off step. Acceptable manufacturer is Hanson Concrete Products, (Milpitas, CA) (Tel 408-262-1091).

D. Frames, Grates and Covers: Caltrans Standard Specification Section 75-1.02, 75-1.03 and 75-1.05.

Galvanize steel frames, grates and covers.

Grates and covers shall be non -rocking, bolt -down type.

Rate for AASHTO H20 loading in paved areas.

2.05 METAL, CONCRETE OR PLASTIC FLARED END SECTIONS
A. General: Caltrans Standard Specification Section 70-1.02C and Caltrans Standard Plan D94A and D94B.

2.06 SLOPE PROTECTION
A. Rock Slope Protection: Caltrans Standard Specification Section 72-2.02. (1) Fabric: Caltrans Standard Specification Section 72-2.025.

B. Concrete/Shotcrete Slope Protection: Caltrans Standard Specification Section 72-4.03.
(1) Bar Reinforcement: Caltrans Standard Specification Section 52-1.02A, minimum Grade 40.
(2) Welded Wire Fabric: Caltrans Standard Specification Section 52-1.02C.

Use 6 x 6-W1.4 xW1.4 unless otherwise indicated.

C. Concreted -Rock Slope Protection: Caltrans Standard Specification Section 72-

5.02. D. Sacked Concrete Slope Protection.
(1) Concrete: Caltrans Standard Specification Section 90, Class 3. (2) Sacks: 10 ounce burlap measuring approximately 19.5 -inches by 36 inches when empty and laid flat.

2.07 CONCRETE/SHOTCRETE DITCH LINING
STORM DRAINAGE UTILITIES 33 40 00 - 7

Page 2387 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
A. General: Caltrans Standard Specification Section 72-4.03. (1) Bar Reinforcement: Caltrans Standard Specification Section 52-1.02A, minimum Grade 40.
(2) Welded Wire Fabric: Caltrans Standard Specification Section 52-1.02C.

Use 6 x 6-W1.4 xW1.4 unless otherwise indicated.

PART 3 EXECUTION

3.01 PIPE INSTALLATION
A. General: Install pipe, fittings, and appurtenances utilizing best practices, manufacturer's instructions, and in accordance with Section 6 and 7 of ASTM D 2321 for plastic pipe, Caltrans Standard Specification Section 65-1.07 for reinforced concrete pipe, Caltrans Standard Specification Sections 66-1.045 and 66-105 for corrugated metal pipe and chapter 11.3.3 of AWWA M41 for cast iron and ductile iron pipe.

B. Pipe Depth and Trench Configuration: Conform to typical trench section(s) indicated.

C. Excavation, Bedding, Backfill, and Compaction: Section 31 23 33 — Trenching and Backfilling.

D. Handling: Carefully handle during loading, hauling, unloading and placing operations to avoid breakage or damage. Use strap type slings for lifting and placing; no chains or hooks will be permitted. Comply with manufacturer's recommendations.

E. Laying: Before lowering pipe into the trench, remove all stakes, debris, loose rock and other hard materials from the bottom of the trench. Lay accurately in conformance with lines and grades indicated. Start laying the pipeline at the low end and proceed upstream. Lay bell and spigot pipe with the bell end facing upstream. Lay pipe on a bed prepared by handwork, dug true to grade. Furnish firm bearing for pipe throughout it's entire length with bell holes provided at the ends of each pipe length of sufficient size to permit making up the particular type of joint being used. Adjust pipe to line and grade by scraping away or filling and tamping material under the body of the pipe for the entire pipe length and not by blocking or wedging. After final positioning, hold pipe in place in trench with backfill material placed equally on both sides of the pipe at as many locations as required to hold the pipe section in place.

F. Curved Alignment: When necessary to conform to the alignment specifically indicated, lay pipe on a curved alignment by means of asymmetrical closure of joints or bending of the pipe barrel. Use shorter lengths of pipe than the standard length if necessary to achieve curvature specified. Do not exceed the recommendations of the pipe manufacture for deflections at the joints or pipe bending.

G. Closure: Close open ends of pipes and appurtenance openings at the end of each days work or when work is not in progress.

STORM DRAINAGE UTILITIES 33 40 00 - 8

Page 2388 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT

3.02 INSTALLATION OF PIPE ANCHORS
A. Install at location, configuration and details shown on the Plans.

3.03 SPECIAL PIPE COUPLINGS
A. General: Use where required to join piping and no other appropriate method is specified. Do not use instead of specified joining methods.

B. Installation: Per manufacturer's instructions.

3.04 INSTALLATION OF CURB INLETS, CATCH BASINS, DROP INLETS, AREA DRAINS, ETC.

A. Excavation, Bedding, Backfill, and Compaction: Section 31 23 33 — Trenching and Backfilling.

B. Poured in Place Structures: Install as indicated and Caltrans Standard Specification Section 51.
(1) Shape bottoms to convey flows as indicated.

C. Precast Structures: Install as indicated.
(1) Seal all joints and pipe entrances and exits.
(2) Place concrete in bottom and shape to convey flows as indicated.

3.05 POLYMER -CONCRETE TRENCH DRAIN INSTALLATION
A. Excavation, Bedding, Backfill, and Compaction: Section 31 23 33 — Trenching and Backfilling.

B. Install: As indicated and in accordance with the manufacturer's instructions.

3.06 CONCRETE OR PLASTIC FLARED END SECTION INSTALLATION A. Install: As indicated.

3.07 SLOPE PROTECTION PLACEMENT
A. Rock Slope Protection: Caltrans Standard Specification Section72-2.03 and as indicated.
(1) Use Method B Placement unless otherwise indicated.

B. Concrete/Shotcrete Slope Protection: Caltrans Standard Specification Section 72-4.02 and 72-4.04.

C. Concreted -Rock Slope Protection: Caltrans Standard Specification Section 72-

5.03 and 72-5.04.
(1) Use Method B Placement unless otherwise indicated.

D. Sacked Concrete Slope Protection.

STORM DRAINAGE UTILITIES 33 40 00 - 9

Page 2389 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Detailed configuration: As indicated.
(2) Use one cubic foot of concrete per sack.
(3) Locate headers and stretchers as indicated.
(4) Headers: Folded end to bank.
(5) Stretchers: Folded ends are not to be adjacent.
(6) Place no more than four vertical courses until initial set has taken place in first course.

3.08 CONCRETE/SHOTCRETE DITCH LINING PLACEMENT
A. Concrete/Shotcrete Slope Protection: Caltrans Standard Specification Section 72-4.02 and 72-4.04.

3.09 TESTING
A. General: Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.
(1) Do not enclose, cover, or put into service before inspection and approval. (2) Test completed piping systems according to authorities having jurisdiction.
(3)
Schedule tests and inspections by authorities having jurisdiction with at least 24 hours advance notice.
(4) Submit separate reports for each test.
(5) Where authorities having jurisdiction do not have published procedures, perform tests in accordance with latest edition of the Uniform Plumbing Code (UPC) Section 1109.0, Testing.
(6) Leaks and loss in test pressure constitute defects that must be repaired. (7) Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified.

END OF SECTION 33 40 00
STORM DRAINAGE UTILITIES 33 40 00 - 10

Page 2390 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
STORM DRAINAGE UTILITIES 33 40 00 - 11

Page 2391 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
SECTION 33 46 00

SUBDRAINAGE
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Subdrains in trenches and subdrains or prefabricated composite drainage panels at walls or foundations.

1.02 RELATED SECTIONS
A. Section 31 23 33 — Trenching and Backfilling.

B. Section 33 05 16 - Utility Structures.

C. Section 33 40 00 - Storm Drainage Utilities.

1.03 RELATED DOCUMENTS
A. AASHTO:
(1) M 252: Corrugated Polyethylene Drainage Tubing.
(2) M 278: Class PS 50 Polyvinyl Chloride (PVC) Pipe.
(3) M 288: Geotextiles Used for Subsurface Drainage Purposes. (4) M 294: Corrugated Polyethylene Pipe, 12- to 24 -in. Diameter.

B. ASTM:
(1) C 1173: Specifications for Flexible Transition Couplings for Underground Piping System.
(2) D 448: Classification for Sizes of Aggregate for Road and Bridge Construction.
(3) D 1621: Test Method for Compressive Properties of Rigid Cellular Plastics.
(4) D 1785: Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.
(5)
D 2235: Solvent Cement for Acrylonitrile-Butadiene-Styrene (ABS) Plastic Pipe and fittings.
(6) D 2321: Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications.
(7)
D 2564: Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems.

SUBDRAINAGE 33 46 00 - 1

Page 2392 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(8) D 2729: Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings. (9) D 2751: Acrylontrile-Butadiene-Styrene (ABS) Sewer Pipe and Fittings. (10) D 3034: Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings. (11) D 4716: Test Method for Constant Head Hydraulic Transmissivity (in - Plane Flow) of Geotextiles and Geotextile Related Products. (12) F 477: Elastomeric Seals (Gaskets) for Joining Plastic Pipe. (13) F 656: Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings.
(14) F-1336: Poly(Vinyl Chloride) (PVC) Gasket Sewer Fittings.

C. Caltrans Standard Specifications:
(1) Section 68 -Subsurface Drains
(2) Section 88 -Engineering Fabrics

1.04 DEFINITIONS
A. AASHTO: American Association of State Highway and Transportation Officials.

B. ABS: Acylonitrile-Butadiene-Styrene.

C. AWWA: American Water Works Association.

D. ABS: Acylonitrile-butadiene-styrene.

E. HDPE: High -density polyethylene.

F. PE: Polyethylene.

G. PVC: Polyvinyl Chloride.

1.05 SUBMITTALS
A. Follow submittal procedures outlined in Section 01 33 00 - Submittal Procedures.

B. Product data for the following:
(1) Perforated pipe and fittings.
(2) Solid pipe and fittings.
(3) Prefabricated composite drainage panels.
(4) Geotextile fabrics.

C. Samples:

SUBDRAINAGE 33 46 00 - 2

Page 2393 of 3058 ends

SPORTS PARK FIELD LIGHTING AND EXPANSION PROJECT

CITY OF BEAUMONT
(1) Drainage Fill.

1.06 DELIVERY, STORAGE AND HANDLING
A. Do not store plastic structures, pipe, and fittings in direct sunlight.

B. Protect pipe, pipe -fittings, and seals from dirt and damage.

C. Protect permeable material from contamination by other materials.

PART 2 PRODUCTS

2.01 PERFORATED WALL AND SOLID WALL PIPE
A. ABS Pipe and Fittings: Smaller than 4 -inch, ASTM D 2751, SDR 35. Solvent cement joints.
(1) Solvent Cement: ASTM D 2235.
(2) Perforation Size, Location, and Spacing: ASTM D 2729.

B. ABS Pipe and Fittings: 4 -inch through 12 -inch, ASTM D 2751, SDR 35. Bell and spigot joints.
(1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Perforation Size, Location, and Spacing: ASTM D 2729.

C. PE Pipe and Fittings (HDPE): 4 -inch through 10 -inch, AASHTO M252 Type S (Solid wall.) or SP (Perforated wall.), smooth interior and corrugated exterior. Bell and spigot joints.
(1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Couplings: AASHTO M 252, corrugated band type. Engage a minimum of 4 corrugations, 2 on each side of pipe joint.
(3)
Perforation Size, Location, and Spacing: AASHTO M 252, Class 2.

D. PE Pipe and Fittings (HDPE): 12 -inch through 48 -inch, AASHTO M 294.Type S (Solid Wall.) or Type SP (Perforated wall.), smooth interior and corrugated exterior. Bell and spigot joints.
(1) Bell and Spigot Joint Gasket: Elastomeric seal, ASTM F 477. (2) Couplings: AASHTO M 252, corrugated band type. Engage a minimum of 4 corrugations, 2 on each side of pipe joint.
(3)
Perforation Size, Location, and Spacing: AASHTO M 294, Class 2.

E. PVC pipe and Fittings: Smaller than 4 -inch, ASTM D1785, Schedule 40. Solvent cement joints.
(1) Solvent Cement: ASTM D 2564. Include primer according to ASTM F656.

SUBDRAINAGE 33 46 00 - 3

Page 2394 of 3058 ends