Cities Index.
Agenda packet, regular meeting

Belmont City Council
March 14, 2023

Document
Agenda packet, regular meeting
Meeting
March 14, 2023
Body
Belmont City Council
Pages
5,061
Original file
122.9 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

1179
Belameda Park
1110 Alameda de las Pulgas, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 203

Page 1123 ends

1180
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
32 203-0-1 Belameda Park
Exterior - On-Site
203-0-1
Belameda
Park
1110 Alameda
de las Pulgas,
Belmont, CA
5 6
4 3
1 2

Page 1124 ends

1181
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Entry Ramp & Stairs
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Change in Direction
6 SF $135 $810
71" deep
PCODE EB08
ADAAG 91 4.8.4(3)
CBC 2007 1133B.5.4
Landing at change of direction not 60" minimum by
72" minimum in the direction of downward travel
from the upper ramp run.

Modify landing at change of direction to 60" x 72".
• As-Built Description:
• Proposed Solution:
• As-Built:
150
ADA 2010 405.7.4
CBC 2016 11B-405.7.4
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Slope
36 SF $300 $10,800

8.7%
PCODE EB02
ADAAG 91 4.8.2
CBC 2007 1133B.5.3
Slope greater than 1:12 (8.3%).

Demolish existing and provide new ramp with
handrails.
• As-Built Description:
• Proposed Solution:
• As-Built:
151
ADA 2010 405.2
CBC 2016 11B-405.2
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1125 ends

1182
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Entry Ramp & Stairs
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD 30 SF $300 $9,000

9.0%
PCODE EB02
ADAAG 91 4.8.2
CBC 2007 1133B.5.3
Slope greater than 1:12 (8.3%).

Demolish existing and provide new ramp with
handrails.
• As-Built Description:
• Proposed Solution:
• As-Built:
155
ADA 2010 405.2
CBC 2016 11B-405.2
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
36 SF $300 $10,800

2.5%
PCODE EB05A
ADAAG 91 4.8.4
CBC 2007 1133B.5.4.1
Level 2% max. landing for ramp not provided.

Rebuild ramp to provide landings for each ramp run
with slopes no greater than 2%
• As-Built Description:
• Proposed Solution:
• As-Built:
154
ADA 2010 405.7.1
CBC 2016 11B-405.7.1
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1126 ends

1183
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Entry Ramp & Stairs
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Tread Surface
238 LF $27 $6,426
PCODE EC02
CBC 2007 1133B.4.4
The leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.

Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
153
ADA 2010 504.4
CBC 2016 11B-504.4.1
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Top and Bottom Extension at
Ramps 9 JOB $510 $4,590
9"-11" extensions
PCODE ED05
ADAAG 91 4.8.5(2)
1133B.4.2.2 &
1133B.5.5.1
CBC 2007
Ramp handrail does not extend horizontally 12" past
top and / or bottom of ramp.

Provide ramp handrail extension (cost for each
extension piece).
• As-Built Description:
• Proposed Solution:
• As-Built:
149
ADA 2010 505.10.1
11B-505.10.1
CBC 2016
Priority Severity
Proj.: 1 4
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1127 ends

1184
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 POT from Entry Ramp to Playground Area and Steep Walkway 203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Cross Slope
75 SF $75 $5,625
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
157
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
100 SF $75 $7,500

5.6%-6.3%
PCODE EF01
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
156
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1128 ends

1185
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 POT from Entry Ramp to Playground Area and Steep Walkway 203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Reach Range
3 JOB $300 $900

49.5" high
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
165
ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Route Sign
1 JOB $510 $510
PCODE SA20
ADAAG 91 35.163(b)
CBC 2007 1127B.3
No sign by inaccessible route directing persons to
an accessible route.

Provide directional sign at steep walkway.
• As-Built Description:
• Proposed Solution:
171
ADA 2010 216.3
CBC 2016 11B-216.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1129 ends

1186
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Steep Walkway
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Walk
REF

5.2%-21.3%
PCODE EF01REF
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.

Interim solution: provide sign at top and bottom of
walk indicting steepness.
• As-Built Description:
• Proposed Solution:
• As-Built:
158
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1130 ends

1187
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 Seating Area
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Picnic Area
1 JOB $2,550 $2,550
25" high
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
161
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
30 SF $75 $2,250

2.4%-2.5% at landing area
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope adjacent to paved pad.
• As-Built Description:
• Proposed Solution:
• As-Built:
160
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1131 ends

1188
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 Swing Set
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Drop-off Adjacent to Walkway
50 LF $135 $6,750

4.5" drop
PCODE PR30A
ADAAG 91 4.3.8
CBC 2007 1133B.8.1
An abrupt change in level exceeding 4" vertically,
except between a walk/sidewalk and an adjacent
street or driveway, is not identified by a 6" minimum
high warning curb above the potential drop off (CA
requirement only) .

Maintain and fill in the drop off with playground bark
material.
• As-Built Description:
• Proposed Solution:
• As-Built:
162
ADA 2010 303.2
CBC 2016 11B-303.5
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
15 LF $135 $2,025
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
163
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1132 ends

1189
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Play Structure
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Changes in Level
600 SF $63 $37,800

4.5" drop
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Maintain and fill in the drop off with playground bark
material.
• As-Built Description:
• Proposed Solution:
• As-Built:
167
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
2 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
25 LF $135 $3,375
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
169
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1133 ends

1190
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Play Structure
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
164
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drop-off Adjacent to Walkway
15 LF $135 $2,025
5" drop
PCODE PR30A
ADAAG 91 4.3.8
CBC 2007 1133B.8.1
An abrupt change in level exceeding 4" vertically,
except between a walk/sidewalk and an adjacent
street or driveway, is not identified by a 6" minimum
high warning curb above the potential drop off (CA
requirement only) .

Maintain and fill in the drop off with playground sand
material.
• As-Built Description:
• Proposed Solution:
• As-Built:
168
ADA 2010 303.2
CBC 2016 11B-303.5
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1134 ends

1191
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Play Structure
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Play Structure
REF

19.5"-20" high
PCODE OC01D
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
Height of transfer platform is more than 18" or less
than 11" above the accessible surface.

Maintain and fill in the drop off with playground bark
material.
• As-Built Description:
• Proposed Solution:
• As-Built:
166
1008.3.1.2
ADA 2010
11B
-1008.3.1.2
CBC 2016
Priority Severity
2 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $114,036.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1135 ends

1192
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Play Structure
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $114,036.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1136 ends

1193
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Play Structure
203-0-1
Belameda Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1110 Alameda de las Pulgas, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: Belameda Park $114,036.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1137 ends

1194
Belmont Sports Complex
550 Island Parkway, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 204

Page 1138 ends

1195
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
33 204-0-1 Belmont Sports Complex - Fields
Exterior - On-Site
204-0-1
Belmont
Sports
Complex-Fields
550 Island
Pkwy,
Belmont, CA
3 7
1 2
13 9
9 10
6 5
8 11
12

Page 1139 ends

1196
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from Main Entry Point to Complex Building
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Changes in Level
REF

0.5"-1" high
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
221
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
1" high
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
223
ADA 2010 403.4
CBC 2016 11B-403.4

1.5" gap
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1140 ends

1197
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from Main Entry Point to Complex Building
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Cross Slope
315 SF $75 $23,625

2.2%-5.2%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
220
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1100 SF $75 $82,500

2.5%-4.1%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
224
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1141 ends

1198
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from Main Entry Point to Complex Building
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Walk
1 SF $15 $15
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
228
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 SF $15 $15
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
229
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1142 ends

1199
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from Main Entry Point to Complex Building
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Curb Ramp
2 JOB $6,000 $12,000

14.0%-15.4%
PCODE EH05A
ADAAG 91 4.7.5
CBC 2007 1127B.5.3
Side slopes more than 1:10 (10%).

Modify curb ramp. Demolish side slopes and replace
with 1:10 side slopes if 48" level top landing is
provided.
• As-Built Description:
• Proposed Solution:
• As-Built:
227
ADA 2010 406.3
CBC 2016 11B-406.2.2
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
2 JOB $750 $1,500
PCODE EH07A
ADAAG 91 4.7.7
CBC 2007 1127B.5.7
Detectable warning not provided where pedestrian
crosses vehicular area.

Provide detectable warning surface (i.e. in-line
truncated domes) at regular curb ramp.
• As-Built Description:
• Proposed Solution:
226
ADA 2010 705.1
CBC 2016 11B-705.1.2.2
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1143 ends

1200
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from Main Entry Point to Complex Building
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Changes in Level
6 SF $63 $378

0.75" high
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
222
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
REF

3.2%
PCODE EF07REF
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
225
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1144 ends

1201
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Accessible Parking
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 General Note
REF
PCODE GN01 Refer to notes for observation and recommendation. • As-Built Description:
• Proposed Solution:
232
11B-502.2;
11B-502.3.1
CBC 2016
General photo of parking spaces
• Notes:

Priority Severity
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Parking
1 JOB $1,050 $1,050
PCODE EA07
ADAAG 91 4.1.2(5)(b)
CBC 2007 1129B.3.2
No van parking provided (one in every 6 or fraction
of 6 accessible spaces, but not less than one.

Provide van parking space(s) by restriping; provide
van sign.
• As-Built Description:
• Proposed Solution:
230
ADA 2010 208.2; 502.1
CBC 2016 11B-208.2.4
4 regular accessible stalls
40 regular stalls
0 van accessible stall
• Notes:

Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1145 ends

1202
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Accessible Parking
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Floor or Ground Surfaces
30 SF $36 $1,080

6.4%
PCODE EA05
ADAAG 91 4.6.3
CBC 2007 1129B.3.3
Accessible parking space has slope greater than
1/4":12" (2%) due to built-up curb ramp.

Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
233
ADA 2010 502.4
CBC 2016 11B-502.4
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Parking
1 JOB $2,190 $2,190
PCODE EA03
ADAAG 91 Fig.9
CBC 2007 1129B.3.1
Disabled persons must wheel or walk behind parked
car(s) other than their own.

Relocate parking and provide curb ramp to
accessible route.
• As-Built Description:
• Proposed Solution:
237
ADA 2010 502.3
CBC 2016 11B-502.7.1
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1146 ends

1203
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Accessible Parking
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Detectable Warning
REF
PCODE EG09REF
ADAAG 91 4.29.5
CBC 2007 1133B.8.5
36" wide band of truncated domes not provided at
walkway or crossing adjoining a vehicular way, if
surfaces are not separated by a curb, railing, or
other element.

Provide 36" wide, contrasting color, band of
truncated domes between pedestrian and vehicular
area.
• As-Built Description:
• Proposed Solution:
234
CBC 2016 11B-705.1.2.5
Priority Severity
1 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Parking
4 JOB $360 $1,440
PCODE EA04A
CBC 2007 1129B.4
International Symbol of Accessibility (36" square, in
white on blue) is not painted on the pavement near
the rear end of the parking space (required in CA
only).

Reapply symbol on parking space pavement when
altering area.
• As-Built Description:
• Proposed Solution:
235
CBC 2016 11B-502.6.4.1
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1147 ends

1204
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Accessible Parking
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 2 JOB $300 $600
40" O.C. hatched lines
PCODE EA04I
CBC 2007 1129B.3.1
CA only: The area within the blue borderlines not
marked with hatched lines a maximum of 36" on
center.

Restripe to provide hatched lines at 36" on center
within access aisle.
• As-Built Description:
• Proposed Solution:
• As-Built:
236
CBC 2016 11B-502.3.3
No blue border
• Notes:

Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Parking Signage
1 JOB $975 $975
PCODE EA04C
CBC 2007 1129B.4
No "Tow Away" sign at parking lot entrance
(required in CA only).

Provide "Tow Away" sign at parking lot entrance
when altering area.
• As-Built Description:
• Proposed Solution:
238
CBC 2016 11B-502.8.2
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1148 ends

1205
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Accessible Parking
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 4 JOB $300 $1,200
PCODE EA04G
CBC 2007 1129B.4
CA only: Additional Sign or additional language
below the symbol of accessibility stating “Minimum
Fine $250” not provided.

Provide compliant parking signage that includes fine
information.
• As-Built Description:
• Proposed Solution:
231
CBC 2016 11B-502.6.2
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1149 ends

1206
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Trail from Complex Building to Playground Structure
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Picnic Area
1 JOB $2,550 $2,550
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
244
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
150 SF $75 $11,250

2.8%-4.0%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
239
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1150 ends

1207
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Trail from Complex Building to Playground Structure
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 600 SF $75 $45,000

2.3%-5.2%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
242
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
20 SF $15 $300
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
240
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1151 ends

1208
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Trail from Complex Building to Playground Structure
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
241
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1152 ends

1209
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 North Baseball Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Reach Range
2 JOB $300 $600
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
252
ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
2 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Handrails
48 LF $285 $13,680
PCODE ED01
ADAAG 91 4.8.5 & 4.9.4
1133B.4.1.1
& .5.5
CBC 2007
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).

Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
249
ADA 2010 505.2
11B-505.2
CBC 2016
Priority Severity
Proj.: 2 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1153 ends

1210
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 North Baseball Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Door Swing
2 JOB $4,500 $9,000
PCODE ID23B
ADAAG 91 Fig. 25(a)
CBC 2007 11B-26A(a)
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).

Remodel gate door entries.
• As-Built Description:
• Proposed Solution:
256
ADA 2010 404.2.4
CBC 2016 11B-404.2.4
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Participation Area
2 JOB $45,000 $90,000
PCODE GF07A
ADAAG 91 4.1.1 (1)
CBC 2007 1104B.4.3
An accessible path of travel is not provided to and
from all participation and activity areas, including
athletic team rooms/facilities, playing fields/running
tracks, baseball/softball player dugouts and
sanitary/locker facilities (home and guest).

Provide an accessible path of travel to all
participation areas.

Alternative solution: program relocation to
accessible field.
• As-Built Description:
• Proposed Solution:
248
CBC 2016 11B-206.2.18
Two dugouts total. Access to dugouts provided
only by stairs.
• Notes: Priority Severity
2 2
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1154 ends

1211
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 North Baseball Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Changes in Level
6 SF $63 $378
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Maintain entry door area of pavement sufficient to
correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
255
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
7 JOB $300 $2,100
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
247
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1155 ends

1212
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 North Baseball Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 4 JOB $150 $600
49" high
PCODE ID17
ADAAG 91 4.13.9
CBC 2007 1133B.2.5.2
Door lock or latch less than 34" or more than 48"
above the floor (CA only: 30" to 44").

Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
254
ADA 2010 404.2.7
CBC 2016 11B-404.2.7
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door Hardware
1 JOB $150 $150
PCODE ID07
ADAAG 91 4.13.9
CBC 2007 1133B.2.5.2
Door does not have accessible operating hardware.

Provide lever handle or other accessible hardware.
• As-Built Description:
• Proposed Solution:
246
ADA 2010 404.2.7
CBC 2016 11B-404.2.7
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1156 ends

1213
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 North Baseball Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Protrusion Limits
2 JOB $75 $150
PCODE EG04
ADAAG 91 4.4.1
CBC 2007 1133B.8.6.1
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.

Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
251
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Fixed Bench
4 JOB $300 $1,200
29"-30" wide
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench. • As-Built Description:
• Proposed Solution:
• As-Built:
245
ADA 2010 903.2
CBC 2016 11B-903.2
Space provided at end of bleachers but not
between; relocate bleachers
• Notes:

Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1157 ends

1214
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 North Baseball Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 2 JOB $1,500 $3,000
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench. • As-Built Description:
• Proposed Solution:
250
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
2 JOB $3,000 $6,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
253
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1158 ends

1215
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 Playground Structure
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Play Structure
REF
PCODE OC01A
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
A 30" x 48" clear area is not provided on at least
one side of the transfer platform.

Provide space as required.
• As-Built Description:
• Proposed Solution:
257
1008.3.1.3
ADA 2010
11B
-1008.3.1.3
CBC 2016
Priority Severity
2 1
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
10 LF $135 $1,350
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
258
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1159 ends

1216
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Picnic Area
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Picnic Area
1 JOB $2,550 $2,550
17" deep x 26.75" high
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
260
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
400 SF $15 $6,000
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Maintain decomposed granite surface.
• As-Built Description:
• Proposed Solution:
259
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016 Decomposed granite creates irregular surfaces. • Notes:

Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1160 ends

1217
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Batting Cage
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Walk
25 SF $15 $375
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
261
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
30 SF $120 $3,600

5.7%
PCODE ID11
ADAAG 91 4.13.6
CBC 2007 1133B.2.4
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).

Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
262
ADA 2010 404.2.4.4
CBC 2016 11B-404.2.4
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1161 ends

1218
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Batting Cage
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Changes in Level
REF
1" high
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
263
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
264
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1162 ends

1219
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
8 Trail
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Cross Slope
400 SF $75 $30,000

2.2%-4.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
265
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
200 SF $75 $15,000

3.6%-5.0%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
271
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1163 ends

1220
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
8 Trail
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Walk
20 SF $15 $300
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
269
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
100 SF $15 $1,500
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
270
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1164 ends

1221
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
8 Trail
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 1 JOB $300 $300
PCODE EF10BREF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Utility box lip broken and/or lid uneven with adjacent
walking surface
Replace utility box and/or lid to be even with
adjacent walking surface.
• As-Built Description:
• Proposed Solution:
266
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
267
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1165 ends

1222
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
8 Trail
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Cross Slope
100 SF $75 $7,500

2.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
268
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
300 SF $75 $22,500

2.2%-2.9%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
272
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1166 ends

1223
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
8 Trail
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 100 SF $75 $7,500

3.1%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
273
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1167 ends

1224
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Passenger Loading Zones
1 JOB $10,500 $10,500
PCODE EA08NT
ADAAG 91 4.6.6
CBC 2007 1131B.2.1
Aisle at passenger drop-off, adjacent to the vehicle
pull-up space is not 60"x 240" and/or slopes more
than 1/4":12" (2%).

Modify passenger drop-off.
• As-Built Description:
• Proposed Solution:
401
ADA 2010 503.1
CBC 2016 11B-503.1
Loading zone not properly striped if area is used
for passenger loading/unloading.
• Notes:

Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Curb or Barrier
310 LF $51 $15,810
PCODE EB14
ADAAG 91 4.8.7
CBC 2007 1133B.5.6
No curb (2" minimum height) or wheel guide
(centered approx. 3" above surface of ramp) at
sides of ramp.

Provide 2" minimum curb or wheel guide.
• As-Built Description:
• Proposed Solution:
390
ADA 2010 405.9.2
CBC 2016 11B-405.9.2
No wheel guides
• Notes:

Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1168 ends

1225
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Height
310 LF $225 $69,750
30" high handrail
PCODE ED02
ADAAG 91 4.9.4(5)
1133B.4.2.1 &
B.5.5.1
CBC 2007
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.

Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
389
ADA 2010 505.4
11B-505.4
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
80 SF $75 $6,000

2.2%-4.1%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
398
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1169 ends

1226
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 50 SF $75 $3,750

5.7%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
402
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
80 SF $15 $1,200
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
394
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1170 ends

1227
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 10 SF $15 $150
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
395
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
392
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016 Areas of irregular surfaces occur along bridge. • Notes:

Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1171 ends

1228
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Detectable Warning
20 LF $81 $1,620
PCODE EG09
ADAAG 91 4.29.5
CBC 2007 1133B.8.5
36" wide band of truncated domes not provided at
walkway or crossing adjoining a vehicular way, if
surfaces are not separated by a curb, railing, or
other element.

Provide 36" wide, contrasting color, band of
truncated domes between pedestrian and vehicular
area.
• As-Built Description:
• Proposed Solution:
400
CBC 2016 11B-705.1.2.5
Detectable warning not provided at transition to
drop-off zone or vehicular way
• Notes:

Priority Severity
1 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Curb Ramp
1 JOB $3,750 $3,750

10.4%
PCODE EH02E
ADAAG 91 4.7.2
CBC 2007 1127B.5.3
Maximum slope of adjoining gutters, street surface
at bottom of ramp exceeds 5% (1:20).

Modify road/gutter slopes. Demolish existing and
provide new curb ramp.
• As-Built Description:
• Proposed Solution:
• As-Built:
403
ADA 2010 406.2
CBC 2016 11B-406.5.8
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1172 ends

1229
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Handrail
310 LF $360 $111,600

5.5" openings at guardrail
PCODE ED08A
CBC 2007 1013.3
Open guards does not have balusters or ornamental
patterns such that a 4-inch-diameter (102 mm)
sphere cannot pass through any opening.

Provide new guards which do not allow passage of
an 4 inch sphere at any opening.
• As-Built Description:
• Proposed Solution:
• As-Built:
391
ADA 2010 405.9.2
CBC 2016 11B-405.9.2
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Changes in Level
40 SF $63 $2,520

0.5"-0.75" high
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
399
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1173 ends

1230
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
9 Foot Bridge & POT Leading to Passenger Drop Off
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Cross Slope
150 SF $75 $11,250

2.2%-3.2%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
396
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
1 JOB $900 $900
40"-43" wide in front of bleachers
PCODE EF08NT
CBC 2007 1133B.7.1
Walk more than 36" but less than 48" wide (required
in CA only).

Relocate bleachers.
• As-Built Description:
• Proposed Solution:
• As-Built:
397
CBC 2016 11B-403.5.1.3
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1174 ends

1231
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
10 Batting Cage
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Cross Slope
100 SF $75 $7,500

2.7%-3.2%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
404
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
405
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1175 ends

1232
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
11 POT Adjacent to Concession Leading to South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Walk
1 JOB $6,000 $6,000
32"-35" wide between fence and
bleachers
PCODE EF08NT
CBC 2007 1133B.7.1
Walk more than 36" but less than 48" wide (required
in CA only).

Relocate fencing.
• As-Built Description:
• Proposed Solution:
• As-Built:
415
CBC 2016 11B-403.5.1.3
Priority Severity
1 2
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Vertical Clearance
60 LF $150 $9,000
9" protrusion at 41" high
PCODE EG01A
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
409
ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1176 ends

1233
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
11 POT Adjacent to Concession Leading to South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Picnic Area
1 JOB $2,550 $2,550
26" high
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
407
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
45 SF $15 $675
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
408
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1177 ends

1234
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
11 POT Adjacent to Concession Leading to South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Changes in Level
80 SF $63 $5,040

0.75" high
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
413
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
700 SF $75 $52,500

2.7%-3.2%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
406
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1178 ends

1235
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
11 POT Adjacent to Concession Leading to South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 240 SF $75 $18,000

2.2%-2.4%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
410
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
1 JOB $3,000 $3,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
411
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1179 ends

1236
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
11 POT Adjacent to Concession Leading to South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 REF
26" high
PCODE IA02
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Wall- and post-mounted cantilevered units: Knee
space not provided at drinking fountain (27" high, 8"
deep, 30" wide from front of drinking fountain).

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
412
ADA 2010 602.2
CBC 2016 11B-602.2
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1180 ends

1237
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
12 South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Door Swing
REF
39" from face of door to column
PCODE ID27REF
ADAAG 91 Fig. 25(c)
CBC 2007 11B-26A(c)
Latch approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 24" x 48" or 54" if door has closer (CA
only: door width plus 24" x 60").

Relocate fencing.
• As-Built Description:
• Proposed Solution:
• As-Built:
418
ADA 2010 404.2.4
CBC 2016 11B-404.2.4
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Reach Range
2 JOB $300 $600
60" high
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
420
ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1181 ends

1238
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
12 South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Door
6 JOB $300 $1,800
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
417
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
20 SF $120 $2,400

2.3%-4.5%
PCODE ID11
ADAAG 91 4.13.6
CBC 2007 1133B.2.4
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).

Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
425
ADA 2010 404.2.4.4
CBC 2016 11B-404.2.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1182 ends

1239
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
12 South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Door Hardware
1 JOB $150 $150
PCODE ID07
ADAAG 91 4.13.9
CBC 2007 1133B.2.5.2
Door does not have accessible operating hardware.

Provide lever handle or other accessible hardware.
• As-Built Description:
• Proposed Solution:
427
ADA 2010 404.2.7
CBC 2016 11B-404.2.7
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Changes in Level
20 SF $63 $1,260
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Maintain decomposed granite ways.
• As-Built Description:
• Proposed Solution:
426
ADA 2010 403.4
CBC 2016 11B-403.4
Lip at entry doors into player dugout
• Notes:

Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1183 ends

1240
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
12 South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Fixed Bench
1 JOB $1,500 $1,500
26" wide
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench. • As-Built Description:
• Proposed Solution:
• As-Built:
416
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
2 JOB $1,500 $3,000
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench. • As-Built Description:
• Proposed Solution:
419
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1184 ends

1241
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
12 South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Door
6 JOB $150 $900
45"-46.5" high
PCODE ID17
ADAAG 91 4.13.9
CBC 2007 1133B.2.5.2
Door lock or latch less than 34" or more than 48"
above the floor (CA only: 30" to 44").

Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
423
ADA 2010 404.2.7
CBC 2016 11B-404.2.7
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
REF
PCODE IA02BREF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Drinking fountain is not 18" - 19" in depth.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
422
ADA 2010 602.8
CBC 2016 11B-602.8
Priority Severity
3 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1185 ends

1242
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
12 South Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Drinking Fountain
2 JOB $3,000 $6,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
421
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1186 ends

1243
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
13 Southwest Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
10121
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Reach Range
2 JOB $300 $600
60" high
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
10112
ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1187 ends

1244
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
13 Southwest Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Changes in Level
20 SF $63 $1,260
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Maintain decomposed granite ways.
• As-Built Description:
• Proposed Solution:
10117
ADA 2010 403.4
CBC 2016 11B-403.4
Lip at entry doors into player dugout
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
20 SF $120 $2,400

2.2%-4.0%
PCODE ID11
ADAAG 91 4.13.6
CBC 2007 1133B.2.4
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).

Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
10116
ADA 2010 404.2.4.4
CBC 2016 11B-404.2.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1188 ends

1245
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
13 Southwest Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 6 JOB $300 $1,800
45"-46.5" high
PCODE ID17
ADAAG 91 4.13.9
CBC 2007 1133B.2.5.2
Door lock or latch less than 34" or more than 48"
above the floor (CA only: 34" to 44").

Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
10115
ADA 2010 404.2.7
CBC 2016 11B-404.2.7
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Fixed Bench
1 JOB $1,500 $1,500
26" wide
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
• As-Built:
10109
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1189 ends

1246
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
13 Southwest Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 2 JOB $1,500 $3,000
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
10111
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
2 JOB $3,000 $6,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
10113
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $791,136.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1190 ends

1247
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
13 Southwest Field
204-0-1
Belmont Sports Complex Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Total Costs for Area: Exterior $791,136.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1191 ends

1248
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 North Concession
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Public Counter
1 JOB $450 $450
40" high
PCODE IN03
ADAAG 91 7.2(2)
CBC 2007 1122B.4
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.

Provide auxiliary shelf, clipboard, or table as
equivalent facilitation.
• As-Built Description:
• Proposed Solution:
• As-Built:
364
ADA 2010 904.4
CBC 2016 11B-904.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Sink
1 JOB $5,250 $5,250
PCODE IN06A
ADAAG 91 4.24.3
CBC 2007 1115B.4.7.1
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.

Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
365
ADA 2010 606.2
CBC 2016 11B-606.2
Priority Severity
4 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1192 ends

1249
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 North Concession
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Public Counter
1 JOB $450 $450
36" high
PCODE IN03
ADAAG 91 7.2(2)
CBC 2007 1122B.4
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.

Provide auxiliary shelf, clipboard, or table as
equivalent facilitation.
• As-Built Description:
• Proposed Solution:
• As-Built:
367
ADA 2010 904.4
CBC 2016 11B-904.4
Same findings at south concession
• Notes:

Priority Severity
4 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Sink
1 JOB $5,250 $5,250

36.25" high
PCODE IN06
ADAAG 91 4.24.2
CBC 2007 1115B.4.7.1
Sink rim higher than 34" above floor.

Remodel sink cabinet to lower sink.
• As-Built Description:
• Proposed Solution:
• As-Built:
366
ADA 2010 606.3
CBC 2016 11B-606.3
Priority Severity
4 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1193 ends

1250
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 North Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Toilet Stall
1 JOB $4,500 $4,500
39" deep wall
PCODE WB03
ADAAG 91 4.17.3
CBC 2007 1115B.3.4.3
Less than 59" from back wall to front wall or door
swing of toilet stall, or less than 56" if water closet is wall-hung.

Provide new enclosure at existing water closet
fixture.
• As-Built Description:
• Proposed Solution:
• As-Built:
373
ADA 2010 604.8.1.1
CBC 2016 11B-604.8.1.1
Out-swinging door
• Notes:

Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Lavatory
1 JOB $4,500 $4,500

24.75" high
PCODE WD04A
ADAAG 91 Fig. 31
CBC 2007 1115B.4.3
Knee clearance 27" min. high starting 8" back from
the front edge of the lavatory towards the wall is not
provided.

Remount compliant fixture to accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
369
ADA 2010 306.3.3
CBC 2016 11B-306.3.3
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1194 ends

1251
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 North Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Signage
1 JOB $270 $270
54" high
PCODE SA15
CBC 2007 1115B.6
Required in CA only: identification symbol centered
60" high on sanitary facility door not provided
(women: 12" ø circle, men: 12" triangle, unisex:
combined symbol).

Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on sign.
• As-Built Description:
• Proposed Solution:
• As-Built:
368
CBC 2016 11B-703.7.2.6
Priority Severity
3 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Grab Bars
1 JOB $780 $780
50" from rear wall
PCODE WB07A
ADAAG 91 Fig. 29(b)
CBC 2007 1115B.4.1.3.1
Side grab bar less than 42" long, or located more
than 12 inches max. from the rear wall, or extending
less than 54" from rear wall (CA only: front end min.
24" in front of water closet).

Provide or relocate accessible side grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
375
ADA 2010 604.5.1
CBC 2016 11B-604.5.1
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1195 ends

1252
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 North Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 1 JOB $1,020 $1,020

20.5" on outside
PCODE WB07B
ADAAG 91 4.17.6
CBC 2007 1115B.4.1.3.2
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.

Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
376
ADA 2010 604.5.2
CBC 2016 11B-604.5.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Stall Door
1 JOB $300 $300
PCODE WB05C
ADAAG 91 4.17.5
CBC 2007 1115B.3.1.4.5
Stall door does not have accessible operating
hardware (U-pulls on both sides, flip-over or sliding
lock).

Provide new accessible locking hardware that does
not require grasping, pinching, or twisting and Upulls on both sides. • As-Built Description:
• Proposed Solution:
372
ADA 2010 604.8.1.2
CBC 2016 11B-604.8.1.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1196 ends

1253
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 North Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Stall Door
1 JOB $75 $75
PCODE WB05B
ADAAG 91 4.22.4
CBC 2007 1115B.3.1.4.4
Stall door to accessible compartment not self
closing.

Adjust closer.
• As-Built Description:
• Proposed Solution:
371
ADA 2010 604.8.1.2
CBC 2016 11B-604.8.1.2
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Toilet Stall
1 JOB $4,500 $4,500

59.75" wide
57" to pilaster
PCODE WB06
ADAAG 91 4.17.3
CBC 2007 1115B.3.1.4.1
Toilet stall less than 60" wide.

Provide new accessible stall.
• As-Built Description:
• Proposed Solution:
• As-Built:
374
ADA 2010 604.8.1.1
CBC 2016 11B-604.8.1.1
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1197 ends

1254
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 North Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Urinal
1 JOB $7,200 $7,200

17.5" high
PCODE WE02
ADAAG 91 4.18.2
CBC 2007 1115B.4.2.1
Fixture mounted with rim more than 17" above floor.

Provide accessible urinal. Remodel restroom as
needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
370
ADA 2010 605.2
CBC 2016 11B-605.2
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1198 ends

1255
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Drinking Fountain
1 JOB $3,000 $3,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
379
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF

12.5" deep
PCODE IA02BREF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Drinking fountain is not 18" - 19" in depth.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
377
ADA 2010 602.8
CBC 2016 11B-602.8
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1199 ends

1256
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Lavatory
1 JOB $10,200 $10,200

15.25" O.C.

PCODE WD01
ADAAG 91 4.19.3
CBC 2007 1115B.4.3
Clear floor space, 30" x 48" in front of fixture,
extending 19" max. under the lavatory, not provided
(CA only: Less than 18" from side wall to centerline
of lavatory).

Provide new accessible lavatory. Remodel restroom
as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
381
ADA 2010 606.2
11B-606.2,
11B-606.6
CBC 2016
Priority Severity
Proj.: 3 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $4,500 $4,500
25" high
PCODE WD04A
ADAAG 91 Fig. 31
CBC 2007 1115B.4.3
Knee clearance 27" min. high starting 8" back from
the front edge of the lavatory towards the wall is not
provided.

Remount compliant fixture to accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
382
ADA 2010 306.3.3
CBC 2016 11B-306.3.3
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1200 ends

1257
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Accessories
1 JOB $225 $225
16" in front of WC
PCODE WG02
ADAAG 91 4.16.6
CBC 2007 1115B.8.4
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9" from
front of water closet.

Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
384
ADA 2010 604.7
CBC 2016 11B-604.7
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
1 JOB $225 $225
1" high
PCODE IA03D
ADAAG 91 4.15.3
CBC 2007 1115B.4.6.5
Drinking fountain water flow less than 4" high; unit in good condition.

Adjust water flow.
• As-Built Description:
• Proposed Solution:
• As-Built:
380
ADA 2010 602.6
CBC 2016 11B-602.6
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1201 ends

1258
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Grab Bars
1 JOB $780 $780
50" from rear wall
PCODE WB07A
ADAAG 91 Fig. 29(b)
CBC 2007 1115B.4.1.3.1
Side grab bar less than 42" long, or located more
than 12 inches max. from the rear wall, or extending
less than 54" from rear wall (CA only: front end min.
24" in front of water closet).

Provide or relocate accessible side grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
385
ADA 2010 604.5.1
CBC 2016 11B-604.5.1
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $1,020 $1,020

20.5" on outside
PCODE WB07B
ADAAG 91 4.17.6
CBC 2007 1115B.4.1.3.2
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.

Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
386
ADA 2010 604.5.2
CBC 2016 11B-604.5.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1202 ends

1259
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Stall Door
1 JOB $300 $300
PCODE WB05C
ADAAG 91 4.17.5
CBC 2007 1115B.3.1.4.5
Stall door does not have accessible operating
hardware (U-pulls on both sides, flip-over or sliding
lock).

Provide new accessible locking hardware that does
not require grasping, pinching, or twisting and Upulls on both sides. • As-Built Description:
• Proposed Solution:
387
ADA 2010 604.8.1.2
CBC 2016 11B-604.8.1.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessories
1 JOB $300 $300
PTD: 45"

8.5" protrusion
PCODE WG01A
ADAAG 91 4.23.7
CBC 2007 1115B.8.3
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from floor
to highest operating slot or control.

Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
383
ADA 2010 308.2.1
CBC 2016 11B-603.5
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1203 ends

1260
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 South Concession
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Public Counter
1 JOB $450 $450

40.25" high
PCODE IN03
ADAAG 91 7.2(2)
CBC 2007 1122B.4
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.

Provide auxiliary shelf, clipboard, or table as
equivalent facilitation.
• As-Built Description:
• Proposed Solution:
• As-Built:
428
ADA 2010 904.4
CBC 2016 11B-904.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1204 ends

1261
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 South Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Lavatory
2 JOB $2,700 $5,400

14.75" O.C.

PCODE WD01A
ADAAG 91 4.19.3
CBC 2007 1115B.4.3
Clear floor space, 30" x 48" in front of fixture,
extending 19" max. under the lavatory, not provided
(CA only: Less than 18" from side wall to centerline
of lavatory).

Relocate existing lavatory.
• As-Built Description:
• Proposed Solution:
• As-Built:
432
ADA 2010 606.2
11B-606.2,
11B-606.6
CBC 2016
Also, occurs in North Men's Restroom
• Notes:

Priority Severity
Proj.: 3 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Lavatory
1 JOB $4,500 $4,500
25" high
PCODE WD04A
ADAAG 91 Fig. 31
CBC 2007 1115B.4.3
Knee clearance 27" min. high starting 8" back from
the front edge of the lavatory towards the wall is not
provided.

Remount compliant fixture to accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
431
ADA 2010 306.3.3
CBC 2016 11B-306.3.3
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1205 ends

1262
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 South Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Protrusion Limits
1 JOB $150 $150

7.5" protrusion at 38" high
PCODE EG04
ADAAG 91 4.4.1
CBC 2007 1133B.8.6.1
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.

Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
433
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Signage
1 JOB $270 $270

53.5" high
PCODE SA15
CBC 2007 1115B.6
Required in CA only: identification symbol centered
60" high on sanitary facility door not provided
(women: 12" ø circle, men: 12" triangle, unisex:
combined symbol).

Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on sign.
• As-Built Description:
• Proposed Solution:
• As-Built:
430
CBC 2016 11B-703.7.2.6
Priority Severity
3 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1206 ends

1263
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 South Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Grab Bars
1 JOB $780 $780
50" from rear wall
PCODE WB07A
ADAAG 91 Fig. 29(b)
CBC 2007 1115B.4.1.3.1
Side grab bar less than 42" long, or located more
than 12 inches max. from the rear wall, or extending
less than 54" from rear wall (CA only: front end min.
24" in front of water closet).

Provide or relocate accessible side grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
440
ADA 2010 604.5.1
CBC 2016 11B-604.5.1
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $1,020 $1,020

20.5" on outside
PCODE WB07B
ADAAG 91 4.17.6
CBC 2007 1115B.4.1.3.2
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.

Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
439
ADA 2010 604.5.2
CBC 2016 11B-604.5.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1207 ends

1264
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 South Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Stall Door
1 JOB $300 $300
PCODE WB05C
ADAAG 91 4.17.5
CBC 2007 1115B.3.1.4.5
Stall door does not have accessible operating
hardware (U-pulls on both sides, flip-over or sliding
lock).

Provide new accessible locking hardware that does
not require grasping, pinching, or twisting and Upulls on both sides. • As-Built Description:
• Proposed Solution:
436
ADA 2010 604.8.1.2
CBC 2016 11B-604.8.1.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Toilet Stall
1 JOB $4,500 $4,500

57.5" wide to pilaster

59.5" deep wall
PCODE WB03
ADAAG 91 4.17.3
CBC 2007 1115B.3.4.3
Less than 59" from back wall to front wall or door
swing of toilet stall, or less than 56" if water closet is wall-hung.

Provide new enclosure at existing water closet
fixture.
• As-Built Description:
• Proposed Solution:
• As-Built:
437
ADA 2010 604.8.1.1
CBC 2016 11B-604.8.1.1
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1208 ends

1265
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 South Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Urinal
1 JOB $7,200 $7,200
18" high
PCODE WE02
ADAAG 91 4.18.2
CBC 2007 1115B.4.2.1
Fixture mounted with rim more than 17" above floor.

Provide accessible urinal. Remodel restroom as
needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
434
ADA 2010 605.2
CBC 2016 11B-605.2
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $1,500 $1,500

45.5" high
PCODE WE03
ADAAG 91 4.18.4
CBC 2007 1115B.4.2.2
Urinal flush control lever more than 48" above floor.
(CA Only: 44" max.)
Provide accessible urinal flush control.
• As-Built Description:
• Proposed Solution:
• As-Built:
435
ADA 2010 605.4
CBC 2016 11B-605.4
Add to North restroom as well
• Notes:

Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1209 ends

1266
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 South Men's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Accessories
1 JOB $225 $225
11" in front of WC
PCODE WG02
ADAAG 91 4.16.6
CBC 2007 1115B.8.4
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9" from
front of water closet.

Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
438
ADA 2010 604.7
CBC 2016 11B-604.7
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1210 ends

1267
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Drinking Fountain
1 JOB $3,000 $3,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
441
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF

12.5" deep
PCODE IA02BREF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Drinking fountain is not 18" - 19" in depth.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
442
ADA 2010 602.8
CBC 2016 11B-602.8
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1211 ends

1268
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Lavatory
1 JOB $2,700 $2,700

15.5" O.C.

PCODE WD01A
ADAAG 91 4.19.3
CBC 2007 1115B.4.3
Clear floor space, 30" x 48" in front of fixture,
extending 19" max. under the lavatory, not provided
(CA only: Less than 18" from side wall to centerline
of lavatory).

Relocate existing lavatory.
• As-Built Description:
• Proposed Solution:
• As-Built:
446
ADA 2010 606.2
11B-606.2,
11B-606.6
CBC 2016
Priority Severity
Proj.: 3 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Lavatory
1 JOB $4,500 $4,500
25" high
PCODE WD04A
ADAAG 91 Fig. 31
CBC 2007 1115B.4.3
Knee clearance 27" min. high starting 8" back from
the front edge of the lavatory towards the wall is not
provided.

Remount compliant fixture to accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
445
ADA 2010 306.3.3
CBC 2016 11B-306.3.3
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1212 ends

1269
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Protrusion Limits
1 JOB $150 $150

7.5" protrusion at 41" high
PCODE EG04
ADAAG 91 4.4.1
CBC 2007 1133B.8.6.1
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.

Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
444
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Signage
1 JOB $270 $270
PCODE SA15
CBC 2007 1115B.6
Required in CA only: identification symbol centered
60" high on sanitary facility door not provided
(women: 12" ø circle, men: 12" triangle, unisex:
combined symbol).

Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on sign.
• As-Built Description:
• Proposed Solution:
443
CBC 2016 11B-703.7.2.6
Priority Severity
3 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1213 ends

1270
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Grab Bars
1 JOB $780 $780
50" from rear wall
PCODE WB07A
ADAAG 91 Fig. 29(b)
CBC 2007 1115B.4.1.3.1
Side grab bar less than 42" long, or located more
than 12 inches max. from the rear wall, or extending
less than 54" from rear wall (CA only: front end min.
24" in front of water closet).

Provide or relocate accessible side grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
450
ADA 2010 604.5.1
CBC 2016 11B-604.5.1
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $1,020 $1,020

20.5" on outside
PCODE WB07B
ADAAG 91 4.17.6
CBC 2007 1115B.4.1.3.2
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.

Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
451
ADA 2010 604.5.2
CBC 2016 11B-604.5.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1214 ends

1271
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Stall Door
1 JOB $300 $300
PCODE WB05C
ADAAG 91 4.17.5
CBC 2007 1115B.3.1.4.5
Stall door does not have accessible operating
hardware (U-pulls on both sides, flip-over or sliding
lock).

Provide new accessible locking hardware that does
not require grasping, pinching, or twisting and Upulls on both sides. • As-Built Description:
• Proposed Solution:
448
ADA 2010 604.8.1.2
CBC 2016 11B-604.8.1.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Lavatory
1 JOB $150 $150
1 second
PCODE WD07
ADAAG 91 4.19.5
CBC 2007 1115B.4.3
Lavatory: Self-closing faucet at accessible lavatory
does not remain open for at least 10 seconds.

Adjust self-closing faucet at accessible lavatory.
• As-Built Description:
• Proposed Solution:
• As-Built:
452
ADA 2010 606.4
CBC 2016 11B-606.4
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1215 ends

1272
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Accessories
2 JOB $300 $600
SCD & PTD: 41" high
PCODE WG01A
ADAAG 91 4.23.7
CBC 2007 1115B.8.3
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from floor
to highest operating slot or control.

Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
447
ADA 2010 308.2.1
CBC 2016 11B-603.5
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $225 $225
10" in front of WC
PCODE WG02
ADAAG 91 4.16.6
CBC 2007 1115B.8.4
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9" from
front of water closet.

Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
449
ADA 2010 604.7
CBC 2016 11B-604.7
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: First Floor $95,085.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1216 ends

1273
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Total Costs for Area: Interior $95,085.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1217 ends

1274
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 South Women's Restroom
204-1-1
Belmont Sports Complex Restrooms &
Concession
Part: Interior Floor: First Floor
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 550 Island Parkway, Belmont, CA 94002 Year Built: 1990 Belmont Sports Complex Restrooms &
Concession
Total Costs for Facility: $886,221.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1218 ends

1275
Cipriani Park
2525 Buena Vista Ave, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 207

Page 1219 ends

1276
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
35 207-0-1 Cipriani Dog Park
Exterior - On-Site
207-0-1
Cipriani Dog
Park
2525 Buena
Vista,
Belmont, CA
3 2 1

Page 1220 ends

1277
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Playground Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Play Structure
REF
PCODE OC01A
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
A 30" x 48" clear area is not provided on at least
one side of the transfer platform.

Provide space as required.
• As-Built Description:
• Proposed Solution:
204
1008.3.1.3
ADA 2010
11B
-1008.3.1.3
CBC 2016
Priority Severity
2 1
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
20 SF $120 $2,400

10.2%
PCODE ID11
ADAAG 91 4.13.6
CBC 2007 1133B.2.4
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).

Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
196
ADA 2010 404.2.4.4
CBC 2016 11B-404.2.4
Priority Severity
2 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1221 ends

1278
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Playground Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Picnic Area
1 JOB $2,550 $2,550

12.5" deep
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
201
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
30 LF $135 $4,050
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk leading to
picnic tables.
• As-Built Description:
• Proposed Solution:
200
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1222 ends

1279
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Playground Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD 7 LF $135 $945
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
205
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
8 LF $135 $1,080
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
206
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1223 ends

1280
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Playground Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Cross Slope
250 SF $75 $18,750

2.7%-6.3%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
203
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
198
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1224 ends

1281
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Playground Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
197
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Fixed Bench
1 JOB $1,500 $1,500
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench. • As-Built Description:
• Proposed Solution:
199
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1225 ends

1282
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dog Park Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Stairways
6600 IN $270 ?
PCODE EC09
ADAAG 91 4.9
CBC 2007 1133B.4
Exterior stair substantially out of compliance.

Provide complete new stair, 4 ft. wide with landing
and handrails.
• As-Built Description:
• Proposed Solution:
216
ADA 2010 504
CBC 2016 11B-504
Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
Stair landings: 10.9%-13.0% slope
PCODE EC10REF Landing at the top or bottom of stairway is not level or not provided.

Remodel landings to provide a level clear floor
space that extends the entire width of the ramp.
• As-Built Description:
• Proposed Solution:
• As-Built:
217
CBC 2016 1009.8
Priority Severity
1 1
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1226 ends

1283
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dog Park Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Walk
300 SF $75 $22,500

14.9%-23.9%
PCODE EF01
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
207
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Handrails
REF
PCODE ED01REF
ADAAG 91 4.8.5 & 4.9.4
1133B.4.1.1
& .5.5
CBC 2007
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).

Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
218
ADA 2010 505.2
11B-505.2
CBC 2016
Priority Severity
Proj.: 1 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1227 ends

1284
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dog Park Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Cross Slope
1000 SF $75 $75,000

3.0%-7.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
211
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Picnic Area
1 JOB $2,550 $2,550

10.25" deep
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
213
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1228 ends

1285
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dog Park Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Ramps
REF
PCODE EB01AREF
ADAAG 91 4.1.1
CBC 2007 1127B.1
Ramp needed to provide disabled access at steps
or change of level along path of travel.

Provide new concrete ramp with handrails [slope
more than 1:20 (5.0%) needed].
• As-Built Description:
• Proposed Solution:
219
ADA 2010 303.4
CBC 2016 11B-303.4
No accessible route.
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
25 LF $135 $3,375
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
212
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1229 ends

1286
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dog Park Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Walk
REF

5.6%-12.2%
PCODE EF01REF
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
215
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
200 SF $15 $3,000
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
209
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1230 ends

1287
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dog Park Area
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
210
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Fixed Bench
1 JOB $1,500 $1,500
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Relocate bench to clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench.

Alternative solution: provide new on paved area
adjacent to walkway.
• As-Built Description:
• Proposed Solution:
214
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1231 ends

1288
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Softball Field
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Accessible Route
500 LF $135 $67,500
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk to
softball/soccer field.
• As-Built Description:
• Proposed Solution:
208
ADA 2010 206.1
CBC 2016 11B-206.1
Image unavailable as children were present
during the time of survey
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $1,989,000.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1232 ends

1289
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Softball Field
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $1,989,000.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1233 ends

1290
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Softball Field
207-0-1
Cipriani Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2525 Buena Vista Ave, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: Cipriani Park $1,989,000.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1234 ends

1291
College View Park
1 College View Way, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 208

Page 1235 ends

1292
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
36 208-0-1 College View Park
Exterior - On-Site
208-0-1
College View
Park
1 College
View Wy,
Belmont, CA
1 2

Page 1236 ends

1293
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Perimeter Sidewalk Serving Park
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Vertical Clearance
1 JOB $300 $300
60"-72" high
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
• As-Built:
120
ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Changes in Level
REF

0.5"-1" high
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
117
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1237 ends

1294
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Perimeter Sidewalk Serving Park
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Cross Slope
1280 SF $75 $96,000

2.8%-4.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
116
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
118
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1238 ends

1295
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Perimeter Sidewalk Serving Park
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Walk
REF

5.3%
PCODE EF01REF
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
119
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1239 ends

1296
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Bench Area
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Changes in Level
REF

1.5"-2" gaps

0.5"-1.25" lips
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
121
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
40 SF $75 $3,000

2.3%-3.0%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
122
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1240 ends

1297
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Bench Area
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Fixed Bench
REF

2.3%-3.0%
PCODE NO07REF
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Repave area to provide a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
• As-Built:
123
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $99,300.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1241 ends

1298
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Bench Area
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $99,300.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1242 ends

1299
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Bench Area
208-0-1
College View Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1 College View Way, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: College View Park $99,300.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1243 ends

1300
Hallmark Park
2599 Hallmark Dr, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 211

Page 1244 ends

1301
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
38 211-0-1 Hallmark Park
Exterior - On-Site
211-0-1
Hallmark
Park
2599
Hallmark Dr,
Belmont, CA
2 1 5
4 3 7 6

Page 1245 ends

1302
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from PRoW to Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Walk
1500 SF $75 $112,500

13.1%-19.7%
PCODE EF01
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
20392
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
20391
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1246 ends

1303
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from PRoW to Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Route Sign
1 JOB $510 $510
PCODE SA20
ADAAG 91 35.163(b)
CBC 2007 1127B.3
No sign by inaccessible route directing persons to
an accessible route.

Provide directional sign.
• As-Built Description:
• Proposed Solution:
20393
ADA 2010 216.3
CBC 2016 11B-216.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
REF
PCODE IA02BREF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Drinking fountain is not 18" - 19" in depth.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
20398
ADA 2010 602.8
CBC 2016 11B-602.8
Priority Severity
3 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1247 ends

1304
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from PRoW to Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Drinking Fountain
1 JOB $3,000 $3,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
20395
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
PCODE IA02REF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Wall- and post-mounted cantilevered units: Knee
space not provided at drinking fountain (27" high, 8"
deep, 30" wide from front of drinking fountain).

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
20400
ADA 2010 602.2
CBC 2016 11B-602.2
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1248 ends

1305
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from PRoW to Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD REF
0" high
PCODE IA03DREF
ADAAG 91 4.15.3
CBC 2007 1115B.4.6.5
Drinking fountain water flow less than 4" high; unit in good condition.

Adjust water flow.
• As-Built Description:
• Proposed Solution:
• As-Built:
20399
ADA 2010 602.6
CBC 2016 11B-602.6
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $6,660 $6,660

22.6%
PCODE IA06
ADAAG 91 4.15.5(1)*
CBC 2007 1115B.4.6.2
30" wide x 48" long clear floor space not provided at
drinking fountain.

Provide clear floor space at drinking fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
20397
ADA 2010 602.2
CBC 2016 11B-602.2
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1249 ends

1306
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT from PRoW to Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Drinking Fountain
1 JOB $1,500 $1,500
PCODE IA05C
ADAAG 91 4.4.1
CBC 2007 1115B.4.6.3
Drinking fountain lacks protection for visually
impaired persons.

Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
20396
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1250 ends

1307
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Fixed Bench
1 JOB $1,500 $1,500

4.0%
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
• As-Built:
20403
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
20402
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1251 ends

1308
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Tennis Court
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Door
REF

3.2%
PCODE ID11REF
ADAAG 91 4.13.6
CBC 2007 1133B.2.4
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).

Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
20401
ADA 2010 404.2.4.4
CBC 2016 11B-404.2.4
Irregular surface
• Notes:

Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1252 ends

1309
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 POT from Tennis Court to Play Structure
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Accessible Route
60 LF $135 $8,100
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
20405
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
350 SF $15 $5,250
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
20404
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1253 ends

1310
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 Play Structure
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Surfacing
300 SF $27 $8,100
PCODE OA01
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
Accessible route within 8'-0" of play equipment is
not firm, resilient safety surfacing.

Provide 8'-0" resilient surfacing around play
structure.
• As-Built Description:
• Proposed Solution:
20406
1008.2.6
ADA 2010
11B-1008.2.6
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1254 ends

1311
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 POT from Tennis Court to Viewing Bench
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Accessible Route
4 LF $135 $540
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
20409
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
780 SF $15 $11,700
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
20408
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1255 ends

1312
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 POT from Tennis Court to Viewing Bench
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Fixed Bench
1 JOB $1,500 $1,500
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
20411
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Reach Range
1 JOB $300 $300
56" high
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
20410
ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Dog waste bag
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1256 ends

1313
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 POT from Play Structure to Cross Country Course Entrance 211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Cross Slope
100 SF $75 $7,500

13.8%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
20415
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door Clearance
1 JOB $7,800 $7,800
14" clear
PCODE ID01
ADAAG 91 4.13.5
CBC 2007 1133B.1.1.1.1
Door on accessible route has less than 32" clear
and 80" (78" min. to closer if provided) opening
width when 90° open.

Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
20417
ADA 2010 404.2.3
CBC 2016 11B-404.2.3
Similar gate entrance at other end of 5k running
course
• Notes:

Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1257 ends

1314
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 POT from Play Structure to Cross Country Course Entrance 211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Walk
550 SF $75 $41,250

3.2%-12.5%
PCODE EF01
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
20413
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
200 SF $15 $3,000
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
20416
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1258 ends

1315
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 POT from Play Structure to Cross Country Course Entrance 211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
20412
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Detectable Warning
20 LF $81 $1,620
PCODE EG09
ADAAG 91 4.29.5
CBC 2007 1133B.8.5
36" wide band of truncated domes not provided at
walkway or crossing adjoining a vehicular way, if
surfaces are not separated by a curb, railing, or
other element.

Provide 36" wide, contrasting color, band of
truncated domes between pedestrian and vehicular
area.
• As-Built Description:
• Proposed Solution:
20414
CBC 2016 11B-705.1.2.5
Recommend pedestrian crossing
• Notes:

Priority Severity
1 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1259 ends

1316
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 POT from Play Structure to Cross Country Course Entrance 211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Door
REF
PCODE ID06REF
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
20418
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Similar gate entrance at other end of 5k running
course
• Notes:

Priority Severity
1 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1260 ends

1317
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Cross Country Course
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Changes in Level
REF
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
20425
ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Trails
1 REF
PCODE NE01
ADAAG 91 16.2.1
CBC 2007 1132B.1
Trail surface is not firm or stable.

Recondition surface and maintain.
• As-Built Description:
• Proposed Solution:
20419
ADA 2010 302.10000000000002
CBC 2016 11B-302.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1261 ends

1318
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Cross Country Course
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Drinking Fountain
REF
PCODE IA02BREF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Drinking fountain is not 18" - 19" in depth.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
20422
ADA 2010 602.8
CBC 2016 11B-602.8
Priority Severity
3 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
1 JOB $3,000 $3,000
PCODE IA01A
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
20420
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1262 ends

1319
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Cross Country Course
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD 1 JOB $225 $225
0" high
PCODE IA03D
ADAAG 91 4.15.3
CBC 2007 1115B.4.6.5
Drinking fountain water flow less than 4" high; unit in good condition.

Adjust water flow.
• As-Built Description:
• Proposed Solution:
• As-Built:
20424
ADA 2010 602.6
CBC 2016 11B-602.6
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $6,660 $6,660

11.6%
PCODE IA06
ADAAG 91 4.15.5(1)*
CBC 2007 1115B.4.6.2
30" wide x 48" long clear floor space not provided at
drinking fountain.

Provide clear floor space at drinking fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
20423
ADA 2010 602.2
CBC 2016 11B-602.2
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1263 ends

1320
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Cross Country Course
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Restroom
1 JOB $9,000 $9,000
PCODE WA01C
ADAAG 91 4.22
CBC 2007 1115B.3.1
Portable restroom not accessible; multiple
compliance violations.

Contact vendor to provide a compliance accessible
unit.
• As-Built Description:
• Proposed Solution:
20426
ADA 2010 603.1
CBC 2016 11B-603.1
Dispersed throughout running course.
• Notes:

Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
1 JOB $1,500 $1,500
PCODE IA05C
ADAAG 91 4.4.1
CBC 2007 1115B.4.6.3
Drinking fountain lacks protection for visually
impaired persons.

Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
20421
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $243,015.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1264 ends

1321
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Cross Country Course
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $243,015.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1265 ends

1322
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
7 Cross Country Course
211-0-1
Hallmark Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2599 Hallmark Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: Hallmark Park $243,015.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1266 ends

1323
Hastings Tot Lot
2400 Hastings Dr, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 212

Page 1267 ends

1324
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
39 212-0-1 Hastings Tot Lot
Exterior - On-Site
212-0-1
Hastings Tot
Lot
2400
Hastings Dr,
Belmont, CA
1

Page 1268 ends

1325
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD Cross Slope
100 SF $75 $7,500

2.9%-13.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
172
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Play Structure
REF
PCODE OC01A
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
A 30" x 48" clear area is not provided on at least
one side of the transfer platform.

Provide space as required.
• As-Built Description:
• Proposed Solution:
179
1008.3.1.3
ADA 2010
11B
-1008.3.1.3
CBC 2016
Priority Severity
1 1
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1269 ends

1326
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD Play Structure
REF
24" high
PCODE OC01D
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
Height of transfer platform is more than 18" or less
than 11" above the accessible surface.

Adjust ground or platform height.
• As-Built Description:
• Proposed Solution:
• As-Built:
178
1008.3.1.2
ADA 2010
11B
-1008.3.1.2
CBC 2016
Priority Severity
1 2
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Picnic Area
1 JOB $2,550 $2,550
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.

Alternative solution: provide new table on level and
clear area.
• As-Built Description:
• Proposed Solution:
177
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1270 ends

1327
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD Accessible Route
20 LF $135 $2,700
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.

Alternative solution: provide new bench on level and
clear area.
• As-Built Description:
• Proposed Solution:
175
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
30 LF $135 $4,050
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.

Alternative solution: provide new table on level and
clear area.
• As-Built Description:
• Proposed Solution:
176
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1271 ends

1328
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD 25 LF $135 $3,375
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
180
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drop-off Adjacent to Walkway
10 LF $135 $1,350

5.5" drop
PCODE PR30A
ADAAG 91 4.3.8
CBC 2007 1133B.8.1
An abrupt change in level exceeding 4" vertically,
except between a walk/sidewalk and an adjacent
street or driveway, is not identified by a 6" minimum
high warning curb above the potential drop off (CA
requirement only) .

Maintain and fill in the drop off with playground bark
material.
• As-Built Description:
• Proposed Solution:
• As-Built:
173
ADA 2010 303.2
CBC 2016 11B-303.5
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1272 ends

1329
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD Fixed Bench
REF
PCODE NO07REF
ADAAG 91 16.12.4
CBC 2007 1132B.1
Clear floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench.

Alternative solution: provide new bench on level and
clear area.
• As-Built Description:
• Proposed Solution:
174
ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $21,525.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1273 ends

1330
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $21,525.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1274 ends

1331
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT to Play Structure
212-0-1
Hastings Tot Lot Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 2400 Hastings Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: Hastings Tot Lot $21,525.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1275 ends

1332
Hidden Canyon Park
End of Carlmont Dr, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 213

Page 1276 ends

1333
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
40 213-0-1 Hidden Canyon Park
Exterior - On-Site
213-0-1
Hidden
Canyon Park
End of
Carlmont Dr,
Belmont, CA
1 2

Page 1277 ends

1334
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD Minimum Number
1 JOB $900 $900
PCODE EA01A
ADAAG 91 4.1.2(5)
CBC 2007 Tbl. 11B-6
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
10301
ADA 2010 208.2
11B-208.2 Tbl.
11B-208.2
CBC 2016
12 spaces total in lot.

No accessible parking provided.

Parking spaces marked by Wheelstops but no
markings and on irregular surfaces
• Notes:

Priority Severity
Proj.: 1 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
5 LF $135 $675
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
10304
ADA 2010 206.1
CBC 2016 11B-206.1
To bulletin board
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1278 ends

1335
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD 500 LF $135 $67,500
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
10309
ADA 2010 206.1
CBC 2016 11B-206.1
No POT provided from Main Street to Trailhead.
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
REF $0
PCODE EF10CREF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface along compacted dirt or
decomposed granite pathway.

Maintain surface of pathway to provide smooth even
surface.
• As-Built Description:
• Proposed Solution:
10307
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Maintain paths where achievable.
• Notes:

Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1279 ends

1336
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trail
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD Fixed Bench
REF
PCODE NO07REF
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
10306
ADA 2010 903.2
CBC 2016 11B-903.2
Maintain adjacent surface.
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Reach Range
1 JOB $300 $300
58" high dog waste bags
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
10302
ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1280 ends

1337
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD Parking Signage
REF
PCODE EA04CREF
CBC 2007 1129B.4
No "Tow Away" sign at parking lot entrance
(required in CA only).

Provide "Tow Away" sign at parking lot entrance
when altering area.
• As-Built Description:
• Proposed Solution:
10300
CBC 2016 11B-502.8.2
No accessible parking currently provided
• Notes:

Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
720 SF $75 $54,000

2.5-3.0%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
10305
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1281 ends

1338
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD Walk
60 SF $15 $900
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
10303
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016 Uneven surface at landing into trail area.
• Notes:

Priority Severity
Proj.: 1 4
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
REF

16.5" deep knee space
PCODE IA02BREF
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Drinking fountain is not 18" - 19" in depth.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
10299
ADA 2010 602.8
CBC 2016 11B-602.8
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1282 ends

1339
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD 1 JOB $9,600 $9,600

36.5" high bubbler
PCODE IA03B
ADAAG 91 4.15.2
CBC 2007 1115B.4.6.4
Drinking fountain bubbler more than 36" above floor.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
10298
ADA 2010 602.4
CBC 2016 11B-602.4
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $133,875.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1283 ends

1340
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $133,875.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1284 ends

1341
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Trailhead Entrance
213-0-1
Hidden Canyon Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: End of Carlmont Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: Hidden Canyon Park $133,875.00 S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1285 ends

1342
McDougal Park
1405 Solana Dr, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 214

Page 1286 ends

1343
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
41 214-0-1 McDougal Park
Exterior - On-Site
214-0-1
McDougal
Park
1405
Solana Dr,
Belmont, CA
1 3
2

Page 1287 ends

1344
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 W Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Handrails
12 LF $285 $3,420
PCODE ED01
ADAAG 91 4.8.5 & 4.9.4
1133B.4.1.1
& .5.5
CBC 2007
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).

Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
142
ADA 2010 505.2
11B-505.2
CBC 2016
Concession no longer in use according to
school representative.
• Notes:

Priority Severity
Proj.: 2 2
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Treads and Risers
20 LF $225 $4,500

3.5"-6.5" risers
PCODE EC07A
CBC 2007 1133B.4.5.3
Steps do not have uniform riser height.

Remodel stairs as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
144
ADA 2010 504.2
CBC 2016 11B-504.2
Concession no longer in use according to
school representative.
• Notes:

Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1288 ends

1345
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 W Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Accessible Route
220 LF $135 $29,700
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
135
ADA 2010 206.1
CBC 2016 11B-206.1
From Southeast to West field
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
120 LF $135 $16,200
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk connecting
bleachers, drinking fountain and picnic tables.
• As-Built Description:
• Proposed Solution:
136
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1289 ends

1346
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 W Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD 100 LF $135 $13,500
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
141
ADA 2010 206.1
CBC 2016 11B-206.1
At least one paved path needed
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Public Counter
REF

43.25" high
PCODE IN03REF
ADAAG 91 7.2(2)
CBC 2007 1122B.4
Service Counter (Stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.

Provide auxiliary shelf, clipboard, or table as
equivalent facilitation.
• As-Built Description:
• Proposed Solution:
• As-Built:
143
ADA 2010 904.4
CBC 2016 11B-904.4
Concession no longer in use according to
school representative
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1290 ends

1347
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 W Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Protrusion Limits
2 JOB $75 $150
5" protrusion at 40" high
PCODE EG04
ADAAG 91 4.4.1
CBC 2007 1133B.8.6.1
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.

Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
137
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
REF
PCODE IA01AREF
ADAAG 91 4.1.3(10)(a)
CBC 2007 1115B.4.6.1
Where only one drinking fountain is provided per
floor: Fountain it is not accessible to individuals who use wheelchairs, or to those who have difficulty
bending or stooping.

Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
140
ADA 2010 211.1
CBC 2016 11B-211.1
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1291 ends

1348
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 W Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD 1 JOB $9,600 $9,600
PCODE IA02
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Wall- and post-mounted cantilevered units: Knee
space not provided at drinking fountain (27" high, 8"
deep, 30" wide from front of drinking fountain).

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
138
ADA 2010 602.2
CBC 2016 11B-602.2
Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1292 ends

1349
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 SE Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Accessible Route
25 LF $135 $3,375
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
124
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
640 LF $135 $86,400
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
129
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1293 ends

1350
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 SE Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD 25 LF $135 $3,375
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
131
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
25 LF $135 $3,375
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
134
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1294 ends

1351
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 SE Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Walk
1 JOB $900 $900
33" wide between fence and
bleachers
PCODE EF08NT
CBC 2007 1133B.7.1
Walk more than 36" but less than 48" wide (required
in CA only).

Relocate bleachers to enlarged path.
• As-Built Description:
• Proposed Solution:
• As-Built:
130
CBC 2016 11B-403.5.1.3
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
3 JOB $300 $900
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
133
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1295 ends

1352
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 SE Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Protrusion Limits
2 JOB $75 $150

5.5" protrusion at 38.25" high
PCODE EG04
ADAAG 91 4.4.1
CBC 2007 1133B.8.6.1
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.

Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
132
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1296 ends

1353
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Walk
500 LF $780 $390,000
PCODE EF01A
ADAAG 91 4.8.1
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Provide a switch back ramp with handrails on both
(2) sides.
• As-Built Description:
• Proposed Solution:
145
ADA 2010 405.1
CBC 2016 11B-405.1
Switch back ramp is necessary
• Notes:

Priority Severity
2 1 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
120 LF $135 $16,200
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
146
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1297 ends

1354
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Door
2 JOB $300 $600
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
148
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Protrusion Limits
1 JOB $75 $75

5.5" protrusion at 39" high
PCODE EG04
ADAAG 91 4.4.1
CBC 2007 1133B.8.6.1
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.

Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
147
ADA 2010 307.2
CBC 2016 11B-307.2
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $582,420.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1298 ends

1355
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $582,420.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1299 ends

1356
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 North Softball Field
214-0-1
McDougal Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 1405 Solana Dr, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: McDougal Park $582,420.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1300 ends

1357
O'Donnell Park
400 Block of Ralston Ave, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 216

Page 1301 ends

1358
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
42 216-0-1 O’Donnell Park
Exterior - On-Site
216-0-1
O’Donnell
Park
400 Block of
Ralston,
Belmont, CA
4 3
6 1
5 2

Page 1302 ends

1359
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Top & Bottom Extension at Stairs
2 JOB $510 $1,020
PCODE ED06
ADAAG 91 4.9.4(2)
CBC 2007 1133B.4.2.2
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.

Extend stair handrail at top only (cost for each
extension piece).
• As-Built Description:
• Proposed Solution:
75 ADA 2010 505.10.2; 505.10.3
11B-505.10.2;
11B-505.10.3
CBC 2016
Priority Severity
Proj.: 1 1
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Vertical Clearance
1 JOB $300 $300
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
66 ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1303 ends

1360
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD 1 JOB $300 $300
60"-78" high
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
• As-Built:
71 ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $300 $300
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
78 ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1304 ends

1361
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD 1 JOB $300 $300
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
84 ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
235 SF $75 $17,625

2.8%-4.3%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
56 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1305 ends

1362
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD 266 SF $75 $19,950

2.6%-6.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
67 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
525 SF $75 $39,375

2.5%-4.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
80 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1306 ends

1363
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Walk
21 SF $15 $315
1" gap
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
70 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF

1.5" gap
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
68 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1307 ends

1364
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD REF

1.25" gap
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
82 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
83 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1308 ends

1365
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Stairways
1 JOB $1,500 $1,500

3.0% sloped bottom landing
PCODE EC10 Landing at the top or bottom of stairway is not level or not provided.

Remodel landings to provide a level clear floor
space that extends the entire width of the ramp.
• As-Built Description:
• Proposed Solution:
• As-Built:
77 CBC 2016 1009.8
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Tread Surface
40 LF $27 $1,080
PCODE EC02
CBC 2007 1133B.4.4
The leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.

Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
76 ADA 2010 504.4
CBC 2016 11B-504.4.1
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1309 ends

1366
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Changes in Level
6 SF $63 $378

0.5" high
PCODE EF03
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
79 ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF

0.5" high
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
74 ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1310 ends

1367
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Cross Slope
72 SF $75 $5,400

2.6%-3.2%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
72 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
160 SF $75 $12,000

2.2%-3.4%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
73 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1311 ends

1368
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Fixed Bench
1 JOB $1,500 $1,500

4.2%
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlaping with other clear space requirements, is
not provided at at least one end of the bench.

Relocate bench to clear floor or ground space to
allow wheelchair users to be seated shoulder-toshoulder with an individual seated on the bench.

Alternative solution: repave area.
• As-Built Description:
• Proposed Solution:
• As-Built:
69 ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF

3.1%
PCODE NO07REF
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Relocate bench to clear and level floor or ground
space to allow wheelchair users to be seated
shoulder-to-shoulder with an individual seated on
the bench.

Alternative solution: repave area.
• As-Built Description:
• Proposed Solution:
• As-Built:
81 ADA 2010 903.2
CBC 2016 11B-903.2
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1312 ends

1369
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 East Entrance to South Entrance
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Reach Range
1 JOB $300 $300
56" deep from walk
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
57 ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
4 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1313 ends

1370
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Basketball Court
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Picnic Area
1 JOB $2,550 $2,550

24.75" high to support brace
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
59 ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
15 LF $135 $2,025
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk to picnic table.
• As-Built Description:
• Proposed Solution:
58 ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1314 ends

1371
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Basketball Court
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Changes in Level
REF

0.75"-1" high
PCODE EF03REF
ADAAG 91 4.3.8
CBC 2007 1133B.7.4
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.

Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
62 ADA 2010 403.4
CBC 2016 11B-403.4
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
1600 SF $75 $120,000

2.2%-4.6%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
63 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1315 ends

1372
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Basketball Court
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Walk
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
64 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
36 SF $75 $2,700

2.7%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
61 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1316 ends

1373
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Basketball Court
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Walk
72" SF $75 $5,400

5.2%-8.4%
PCODE EF01
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
60 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1317 ends

1374
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Accessible Basketball Court
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Walk
9 SF $15 $135
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
86 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
100 SF $75 $7,500

2.5%-3.0%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope and designate as accessible
basketball court.
• As-Built Description:
• Proposed Solution:
• As-Built:
85 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1318 ends

1375
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Play Structure
REF
PCODE OC01A
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
A 30" x 48" clear area is not provided on at least
one side of the transfer platform.

Provide space as required.
• As-Built Description:
• Proposed Solution:
89 1008.3.1.3
ADA 2010
11B
-1008.3.1.3
CBC 2016
Priority Severity
2 1
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
100 LF $135 $13,500
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
87 ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1319 ends

1376
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
4 Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD 100 LF $135 $13,500
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
88 ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Play Structure
REF

21.5" high
PCODE OC01D
36 CFR Part
1191
ADAAG 91
DSA 99-02
CBC 2007
Height of transfer platform is more than 18" or less
than 11" above the accessible surface.

Adjust ground or platform height.
• As-Built Description:
• Proposed Solution:
• As-Built:
90 1008.3.1.2
ADA 2010
11B
-1008.3.1.2
CBC 2016
Priority Severity
2 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1320 ends

1377
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 Picnic & Garden Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Accessible Route
27 LF $135 $3,645
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
92 ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
20 LF $135 $2,700
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Resurface area and maintain.
• As-Built Description:
• Proposed Solution:
93 ADA 2010 206.1
CBC 2016 11B-206.1
Uneven decomposite granite area
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1321 ends

1378
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 Picnic & Garden Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Walk
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Resurface area and maintain.
• As-Built Description:
• Proposed Solution:
94 ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016 Uneven decomposite granite area
• Notes:

Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
165 SF $75 $12,375

2.3%-3.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
91 ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1322 ends

1379
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 Picnic & Garden Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Reach Range
3 JOB $300 $900

49.25" high
PCODE IE01
ADAAG 91 4.2.5
CBC 2007 1118B.5
Reach height to control or access point, exceeds
48" or is less than 15".

Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
98 ADA 2010 308.2.1
CBC 2016 11B-308.2.1
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
1 JOB $9,600 $9,600
26" high due to dirt build up
PCODE IA02
ADAAG 91 4.15.5(1)
CBC 2007 1115B.4.6.2
Wall- and post-mounted cantilevered units: Knee
space not provided at drinking fountain (27" high, 8"
deep, 30" wide from front of drinking fountain).

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
96 ADA 2010 602.2
CBC 2016 11B-602.2
Maintaining dirt area will create level change at
floor space
• Notes:

Priority Severity
3 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1323 ends

1380
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
5 Picnic & Garden Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Drinking Fountain
1 JOB $6,660 $6,660
PCODE IA06
ADAAG 91 4.15.5(1)*
CBC 2007 1115B.4.6.2
30" wide x 48" long clear floor space not provided at
drinking fountain.

Provide clear floor space at drinking fountain.
• As-Built Description:
• Proposed Solution:
95 ADA 2010 602.2
CBC 2016 11B-602.2
Priority Severity
3 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Drinking Fountain
REF
2" high
PCODE IA03E
ADAAG 91 4.15.3
CBC 2007 1115B.4.6.5
Drinking fountain water flow less than 4" high; unit in poor condition and is difficult to operate.

Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
97 ADA 2010 602.6
CBC 2016 11B-602.6
Priority Severity
3 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1324 ends

1381
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Vertical Clearance
1 JOB $300 $300
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
103
ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Picnic Area
1 JOB $2,550 $2,550
PCODE NH11A
ADAAG 91 16.5.4.

CBC 2007 1132B.1
Knee clearance at minimums 27" high, 30" wide,
and 19" deep is not provided.

Modify picnic table as required to provide knee
clearance.
• As-Built Description:
• Proposed Solution:
104
ADA 2010 306.3
CBC 2016 11B-306.3
Priority Severity
2 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1325 ends

1382
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Accessible Route
20 LF $135 $2,700
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
106
ADA 2010 206.1
CBC 2016 11B-206.1
Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
100 SF $15 $1,500
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Resurface area and maintain.
• As-Built Description:
• Proposed Solution:
105
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016 Decomposed granite creates irregular surfaces
• Notes:

Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1326 ends

1383
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD 12 SF $15 $180
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
107
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
PCODE EF10REF
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Resurface area and maintain.
• As-Built Description:
• Proposed Solution:
108
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016 Decomposed granite creates irregular surfaces
• Notes:

Priority Severity
Proj.: 2 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1327 ends

1384
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Door
1 JOB $300 $300
PCODE ID06
CBC 2007 1133B.2.6
At push side of door on accessible route, bottom 10"
does not have a smooth, uninterrupted surface.

Provide 10" min. "kick plate" covering width of door
when altering area.
• As-Built Description:
• Proposed Solution:
100
ADA 2010 404.2.10
CBC 2016 11B-404.2.10
Priority Severity
2 3
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Cross Slope
210 SF $75 $15,750

2.3%-3.5%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
101
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1328 ends

1385
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD 283 SF $75 $21,225

2.5%-3.7%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
102
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Door
1 JOB $150 $150
46" high
PCODE ID17
ADAAG 91 4.13.9
CBC 2007 1133B.2.5.2
Door lock or latch less than 34" or more than 48"
above the floor (CA only: 30" to 44").

Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
99 ADA 2010 404.2.7
CBC 2016 11B-404.2.7
Priority Severity
2 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $349,488.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1329 ends

1386
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $349,488.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1330 ends

1387
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
6 Tots Playground Area
216-0-1
O'Donnell Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: 400 Block of Ralston Ave, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: O'Donnell Park $349,488.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1331 ends

1388
Patricia Wharton Park Norte
Dame Ave/ Middle Rd, Belmont, CA 94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 217

Page 1332 ends

1389
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
43 217-0-1 Patricia Wharton Park Notre
Exterior - On-Site
217-0-1
Patricia
Wharton Park
Notre
Dame Ave &
Middle Rd ,
Belmont, CA
1

Page 1333 ends

1390
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT Serving Park
217-0-1
Patricia Wharton Park Norte Part:Exterior Floor: On-site City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Dame Ave/ Middle Rd, Belmont, CA 94002 Year Built: TBD Vertical Clearance
1 JOB $300 $300
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
110
ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
1 JOB $300 $300
PCODE EG01
ADAAG 91 4.4.2
CBC 2007 1133B.8.6.2
Overhead clearance less than 80" above finished
floor.

Maintain and trim overhanging foliage.
• As-Built Description:
• Proposed Solution:
115
ADA 2010 307.4
CBC 2016 11B-307.4
Priority Severity
1 2 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1334 ends

1391
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT Serving Park
217-0-1
Patricia Wharton Park Norte Part:Exterior Floor: On-site City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Dame Ave/ Middle Rd, Belmont, CA 94002 Year Built: TBD Cross Slope
50 SF $75 $3,750

2.5%-4.3%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
113
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
5 SF $15 $75
PCODE EF10
ADAAG 91 4.5.2
CBC 2007 1133B.7.1
Walk: Irregular surface in pavement.

Smooth pavement surface; grind or refinish surface.
• As-Built Description:
• Proposed Solution:
112
ADA 2010 303.1; 302.1
11B-303.1;
11B-302.1
CBC 2016
Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1335 ends

1392
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT Serving Park
217-0-1
Patricia Wharton Park Norte Part:Exterior Floor: On-site City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Dame Ave/ Middle Rd, Belmont, CA 94002 Year Built: TBD Cross Slope
30 SF $75 $2,250

2.8%
PCODE EF07
ADAAG 91 4.3.7
CBC 2007 1133B.7.1.3
Cross slope more than 1":48" (2.083%).

Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
114
ADA 2010 403.3
CBC 2016 11B-403.3
Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Walk
90 SF $75 $6,750

5.5%-7.3%
PCODE EF01
ADAAG 91 4.3.7
CBC 2007 1133B.7.3
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.

Modify walk/sidewalk slope to 1:20 or less.

Alternative solution: provide 20 linear feet of
handrails on both sides.
• As-Built Description:
• Proposed Solution:
• As-Built:
109
ADA 2010 403.3
CBC 2016 11B-403.3
Entrance at Dame Rd and North Rd
• Notes:

Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1336 ends

1393
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT Serving Park
217-0-1
Patricia Wharton Park Norte Part:Exterior Floor: On-site City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Dame Ave/ Middle Rd, Belmont, CA 94002 Year Built: TBD Fixed Bench
2 JOB $1,500 $3,000

2.9%-4.5% slope
PCODE NO07
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Repave to provide a clear and level floor or ground
space to allow wheelchair users to be seated
shoulder-to-shoulder with an individual seated on
the bench.
• As-Built Description:
• Proposed Solution:
• As-Built:
111
ADA 2010 903.2
CBC 2016 11B-903.2
Adjacent to benches
• Notes:

Priority Severity
1 4 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $16,425.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1337 ends

1394
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT Serving Park
217-0-1
Patricia Wharton Park Norte Part:Exterior Floor: On-site City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Dame Ave/ Middle Rd, Belmont, CA 94002 Year Built: TBD Total Costs for Area: Exterior $16,425.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1338 ends

1395
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 POT Serving Park
217-0-1
Patricia Wharton Park Norte Part:Exterior Floor: On-site City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Dame Ave/ Middle Rd, Belmont, CA 94002 Year Built: TBD Total Costs for Facility: Patricia Wharton Park Norte $16,425.00 S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1339 ends

1396
Ralston Ranch Park
Across from 1 Ralston Ranch Rd, Belmont, CA
94002
Accessibility Compliance Survey Report
City of Belmont
March 2018
SSA Project #: 16070.00
Facility #: 219

Page 1340 ends

1397
Location:

Facility:

BARRIER

LOCATION
MAP
1 Item Number
Prepared By:

Project #:

Date:

Sheet:

REF NORTH
N.T.S.

Sally Swanson
Architects
San Francisco, CA
City of Belmont
16070.00
05-19-2017
Path of Travel
44 219-0-1 Ralston Ranch Park
Exterior - On-Site
219-0-1
Ralston
Ranch Park
Block of 1
Ralston Ranch,
Belmont, CA
1 3
2

Page 1341 ends

1398
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
1 Open Space
219-0-1
Ralston Ranch Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Across from 1 Ralston Ranch Rd, Belmont, CA 94002 Year Built: TBD General Note
REF
PCODE GN01 Refer to notes for observation and recommendation. • As-Built Description:
• Proposed Solution:
10318
CBC 2016 11B-402.2
Area appears to be an open space.

While the terrain is steep and hilly, there
appears to be no accessible elements in the
area to examine.
• Notes:

Priority Severity
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1342 ends

1399
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dedicated Bike Lane
219-0-1
Ralston Ranch Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Across from 1 Ralston Ranch Rd, Belmont, CA 94002 Year Built: TBD General Note
REF
PCODE GN01 Refer to notes for observation and recommendation. • As-Built Description:
• Proposed Solution:
10319
CBC 2016 11B-402.2
Bike lane provided along Westbound Ralston
Ave where sidewalk ends. Path connects to a
steep trail for cycling only but pedestrians are
forced to use the path if they wish to continue
along Ralston Ave
Verify if this portion is considered part of
Ralston Ranch Park.
• Notes:

Priority Severity
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
REF
PCODE GN01 Refer to notes for observation and recommendation. • As-Built Description:
• Proposed Solution:
10321
CBC 2016 11B-206.1
Connecting bike trail
• Notes:

Priority Severity
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1343 ends

1400
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
2 Dedicated Bike Lane
219-0-1
Ralston Ranch Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Across from 1 Ralston Ranch Rd, Belmont, CA 94002 Year Built: TBD Accessible Route
REF
PCODE EF13REF
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
10320
ADA 2010 206.1
CBC 2016 11B-206.1
No connection to walk from bike path for
pedestrians
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1344 ends

1401
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Vista Point
219-0-1
Ralston Ranch Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Across from 1 Ralston Ranch Rd, Belmont, CA 94002 Year Built: TBD Minimum Number
1 JOB $900 $900
PCODE EA01A
ADAAG 91 4.1.2(5)
CBC 2007 Tbl. 11B-6
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
10323
ADA 2010 208.2
11B-208.2 Tbl.
11B-208.2
CBC 2016
4 spaces total. No accessible space provided.
• Notes:

Priority Severity
Proj.: 1 3
Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Accessible Route
4 LF $135 $540
PCODE EF13
ADAAG 91 4.3.2
CBC 2007 1114B.1.2
No walk / sidewalk provided to connect accessible
facilities or elements that are on the same site.

Provide new 48" wide walk / sidewalk.
• As-Built Description:
• Proposed Solution:
10327
ADA 2010 206.1
CBC 2016 11B-206.1
To cigarette disposal
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1345 ends

1402
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Vista Point
219-0-1
Ralston Ranch Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Across from 1 Ralston Ranch Rd, Belmont, CA 94002 Year Built: TBD Curb Ramp
1 JOB $7,500 $7,500
PCODE EH01
ADAAG 91 4.7.1
CBC 2007 1127B.5.1
No curb ramp available where an accessible route
crosses a curb.

Provide new curb ramp.
• As-Built Description:
• Proposed Solution:
10325
ADA 2010 303.4
CBC 2016 11B-402.2
2 benches total. No curb cut provided to bench.
• Notes:

Priority Severity
1 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Parking Signage
REF
PCODE EA04CREF
CBC 2007 1129B.4
No "Tow Away" sign at parking lot entrance
(required in CA only).

Provide "Tow Away" sign at parking lot entrance
when altering area.
• As-Built Description:
• Proposed Solution:
10324
CBC 2016 11B-502.8.2
Priority Severity
1 4
Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1346 ends

1403
Codes / Mitigation Info Qty Unit Cost Total
Access Compliance Survey Report
Facility:
3 Vista Point
219-0-1
Ralston Ranch Park Part:Exterior Floor: On-site
City of Belmont
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Address: Across from 1 Ralston Ranch Rd, Belmont, CA 94002 Year Built: TBD Fixed Bench
REF
PCODE NO07REF
ADAAG 91 4.32.2
CBC 2007 1118B.4
Clear and level floor or ground space (30" x 48") not
overlapping with other clear space requirements, is
not provided at at least one end of the bench.

Provide and position a clear and level floor or
ground space to allow wheelchair users to be
seated shoulder-to-shoulder with an individual
seated on the bench.
• As-Built Description:
• Proposed Solution:
10326
ADA 2010 903.2
CBC 2016 11B-903.2
2 benches total
• Notes:

Priority Severity
2 3 Proj.:

Completion Year:

TBD
TBD
Dept.: TBD
Start Year: TBD
Funding Source: TBD
No Image
Mitigated:

YES NO
Total Costs for Floor: On-site $8,940.00
S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 16070.00

Page 1347 ends
← All documents from this meeting