Cities Index.
Agenda packet

Brentwood City Council
July 1, 2025

Document
Agenda packet
Meeting
July 1, 2025
Body
Brentwood City Council
Pages
872
Original file
170.0 MB
Text extracted from the city's file for reading and search. Open the original on pub-brentwood.escribemeetings.com. That file is the official record.

Soil Nuclear Gauge
Test Method: ASTM D 6938
MK Reviewed
Report Date: 09/12/2023
Report #: SNG-000005
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 3 of 3 ends

DRAFT

Page 338 of 872 ends

Report Summary
Phase: Earthwork
Type of Inspection / Service: Soil
Date: 08/28/2023
BSK Associates arrived on site for observation and testing of finish subgrade for  over ex crane pad on North side of abutment #1 GBI grading contractor had worked on Sunday to bring grade up to finish.  BSK had contractor pothole 1' down test location and also tested finish grade. BSK obtained relative compaction at the time of testing of 95% or greater. BSK notified contractor of finding.

BSK Associates then went to southern side of the bridge for observation and backfill testing of abutment #2. The contractor moisture conditioned native soils then used a excavator to place fill followed by a front vibrating sheeps­foot drum Hamm H101i compactor for compaction efforts.  BSK took in place nuclear density tests obtaining relative compaction at the time of testing meeting project requirements.

Please see attached site plan for rough test locations and elevations.

BSK picked up 1 set of 5 concrete cylinders.  Samples taken at end of the day to BSK Livermore Materials Laboratory for assigned testing.

Photos
Photo Description: Bottom of footings Elv.

Soils Daily Field Report Report #: 001­B­000007
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 3 ends

DRAFT

Page 339 of 872 ends

Photo Description: Rough tests locations
The work  Was  inspected in accordance with City or County approved documents The work inspected/tested Met the requirements of the City or County approved documents.

Technician: Matt Lagerstrom
Soil Nuclear Gauge
Soils Daily Field Report Report #: 001­B­000007
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 2 of 3 ends

DRAFT

Page 340 of 872 ends

Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min/Max
Comp.
(%)
Optimum
Moisture
Tolerance
(%) Remark
42 08/28/23 26992 A CL 12.6 117.1 13.7 113.2 128.7 8 97 90 / 100 -5 / 5 DP/MP 43 08/28/23 26992 A CL 12.6 117.1 13.5 112.3 127.5 8 96 90 / 100 -5 / 5 DP/MP 44 08/28/23 27012 A CL 13.8 114.8 16.3 110.3 128.3 8 96 95 / 100 -5 / 5 DP/MP 45 08/28/23 27012 A CL 13.8 114.8 15.2 110.6 127.4 8 96 95 / 100 -5 / 5 DP/MP 46 08/28/23 27012 A CL 13.8 114.8 16.1 109.9 127.6 8 96 95 / 100 -5 / 5 DP/MP 47 08/28/23 27012 A CL 13.8 114.8 15.4 109.2 126.0 8 95 95 / 100 -5 / 5 DP/MP 48 08/28/23 27012 A CL 13.8 114.8 14.9 109.1 125.4 8 95 95 / 100 -5 / 5 DP/MP Test Information
Test # Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
42 Structural Fill: Retaining Wall: North side abutment Bridge over ex pile driving pad.

Abutment #1
148.0 FG CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom 43 Structural Fill: Retaining Wall: North side abutment Bridge over ex pile driving pad.

Abutment #1
149.0 FG CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom 44 Structural Fill: Retaining Wall: South side abutment #2 "SCE" STA 17+70 4' off abutment face
139.0 CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom 45 Structural Fill: Retaining Wall: South side abutment #2 "SCE" STA 17+20 6' off abutment face
142.0 CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom 46 Structural Fill: Retaining Wall: South side abutment #2 "SCE" STA 17+10 3' off abutment face
143.0 CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom 47 Structural Fill: Retaining Wall: South side abutment #2 "SCE" STA 17+53 7' off abutment face
141.0 CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom 48 Structural Fill: Retaining Wall: South side abutment #2 "SCE" STA 17+80 5' off abutment face
142.0 CPN / MC-3 / M36046725 / 06/06/2023 Matt Lagerstrom Remarks
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency.

The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 1 ends

Soil Nuclear Gauge
Test Method: ASTM D 6938
MK Reviewed
Report Date: 09/12/2023
Report #: SNG-000006
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 3 of 3 ends

DRAFT

Page 341 of 872 ends

Sample Details
Technician: Ken Clark
Sample Location: Over excavation at South Abutment.

Sample Date: 07/31/2023
Sample Number: 26991
ASTM D1557
Method: A (ASTM D1557)
Preparation Method: Moist
Rammer Type: Manual Round
Specific Gravity: 2.53
Maximum Dry Density (pcf): 120.4
Optimum Moisture (%): 10.5
Soil Classification: CL Lean clay with sand,Brown
Test Completed By: David LeTorik Test Completed Date: 07/31/2023 Approved By: Nicholas Shelly Approved Date: 08/01/2023
Moisture­Density Relationship Report #: MDRS­000001
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 2 ends

DRAFT

Page 342 of 872 ends

Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
1-1 7 08/01/23 2 / 5 4.00 12.57 92,030 7,320 4 N
1-2 28 08/22/23 2 / 26 4.00 12.57 100,590 8,000 4 N
1-3 28 08/22/23 2 / 26 4.00 12.57 99,430 7,910 4 N
1-4 28 08/22/23 2 / 26 4.00 12.57 101,260 8,060 4 N
1-5 56 H 09/19/23 2 / 54
Test Age Average Strengths (psi): 28 Day - 7990
Tested By: Nicholas Shelly (1), David Ordaz (2,3,4)
Checked In : 07/27/2023 (1,2,3,4,5)
Capping Methods
N: Unbonded Caps (ASTM C1231)
Set #: 1
Specimen Size: 4" X 8"
Specimens In Set: 5
Truck / Ticket #: 3 / 118805
Contractor: Kie-Con
Technician: Dennis Ness
Cast By: Dennis Ness
Date Cast: 07/25/23
Sampled From: Chute
Placement Method: Buggy
Sample Details
Batched: 08:31 PDT
Sampled: 08:42 PDT
Cast: 08:47 PDT
Truck Empty:

Placement Time:

Placement Location: Bridge - Piles
Location Details: Kie-Con Plant
Sample Location / Notes: Pile No. 5, East
Batch Log
Strength: 7000 (psi)
Slump: 2 - 9 (in)
Specifications
Supplier: Kie-Con
Plant: Antioch - 3551 Wilbur
Avenue
Mix Design: CA270-V81
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight: 146.4 (lb/ft³) (ASTM C138)
Air Content: 2.5 (ASTM C173)
Load Volume: 4.50 (yd³)
Weather: Clear Slump (in): 6 (ASTM C143)
Air Temperature (F): 72 Concrete Temp (F): 75 (ASTM C1064) Lab Test Results
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 1 ends

Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
Sand Creek Road
Compressive Strength of Concrete
Test Method: ASTM C39 Sample: 26928
Report #: CC-000002
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925-315-3151
Report Date: 08/28/2023
DRAFT

Page 343 of 872 ends

General Information
Phase: Concrete
Date: 09/08/2023 Permit Number: City of Brentwood
Specifications Used: Approved Plans and Specifications
Work Performed: Rebar Inspection
Inspection/Testing Data
Inspected/Tested: Rebar Inspection Frequency: Periodic
Location / Area: Footings
Narrative: Performed installed steel reinforcement observations for abutment 1 (east) and abutment 1 (west).

Reference A/S6.

Photos
Description of Photo: Typical abutment #1 (east).

Concrete Activity Report Report #: 013­000009
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 1 of 3 ends

DRAFT

Page 344 of 872 ends

Description of Photo: Typical abutment #1 (east).

The work Was Inspected/tested in accordance with Approved Documents The work Met  the requirements of Approved Plans and Specifications.

Inspector/ Technician: Keven Evans
Certification Number: Evans, Keven ­ ICC ­ Reinforced Concrete ­ 5267487 Concrete Activity Report Report #: 013­000009
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 2 of 3 ends

DRAFT

Page 345 of 872 ends

Project Information
Paving Contractor: Goodfellow Top Grade Activity Date: 11/05/2024 HMA Producer: Vernailis Shift Begin Time: 06:00
Shift End Time: 05:00
Construction Process
Weather: Partly Cloudy Process: Standard
Location:

Base and top lifts see site plan for rough test locations and limits Lot Number: 1
Lift: 3 " base lift 3/4" HMA then 2 ­3 2" 1/2" HMA top lifts Production Start Up Evaluation: No JMF Verification: No Tack Coat
Type of Tack Coat: SSN­1 Tack Coat App. Rate: 0.05 Tack Coat Supplier:

Northwest oil
Tack Coat Broken: No
Certificate of Compliance: No
Production Details
Note: 24 hr time period
Paving Start Time: 07:40
Paving End Time: 04:02
Rolling End Time: 04:30
Compaction End Time: 04:32
Tons Paved During This Shift: 440.99
Total Tons Placed To Date: 440.99
HMA Placement Report Report #: HMAP­000002
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 1 of 10 ends

DRAFT

Page 346 of 872 ends

Type of Tack Coat: SSN­1 Tack Coat App. Rate: 0.05 Tack Coat Supplier:

Northwest oil
Tack Coat Broken: No
Certificate of Compliance: No
Production Details
Note: 24 hr time period
Paving Start Time: 07:40
Paving End Time: 04:02
Rolling End Time: 04:30
Compaction End Time: 04:32
Tons Paved During This Shift: 440.99
Total Tons Placed To Date: 440.99
Attachments
HMA Placement Report Report #: HMAP­000002
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 2 of 10 ends

DRAFT

Page 347 of 872 ends

HMA Placement Report Report #: HMAP­000002
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 3 of 10 ends

DRAFT

Page 348 of 872 ends

HMA Placement Report Report #: HMAP­000002
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 4 of 10 ends

DRAFT

Page 349 of 872 ends

The work inspected/tested met the requirements of the City or County approved documents.

Technician: Matt Lagerstrom
Bituminous Density
HMA Placement Report Report #: HMAP­000002
MK Reviewed
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C00000885
City of Brentwood Sand Creek Road Extension
CIP336­31700
Sand Creek Road
Brentwood, CA 99999

Page 5 of 10 ends

DRAFT

Page 350 of 872 ends

Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.

Min/Max
Comp.
(%) Remark
Gauge
SN Technician
33 11/05/24 Pavement - Bottom Lift:

See site plan for rough
test locations
3/4" HMA
Type A
with 15%
RAP
3 154.9 3/4"
HMA
(Teichert
,
Vernalis)
10-15-24
/
Maximu
m Theo
AASHTO
T209
144.2 Backscatter 93 92 / 98 M36046725 Matt Lagerstrom
34 11/05/24 Pavement - Bottom Lift:

See site plan for rough
test locations
3/4" HMA
Type A
with 15%
RAP
3 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
143.5 Backscatter 94 91 / 98 M36046725 Matt Lagerstrom
35 11/05/24 Pavement - Bottom Lift:

See site plan for rough
test locations
3/4" HMA
Type A
with 15%
RAP
3 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
142.1 Backscatter 93 91 / 98 M36046725 Matt Lagerstrom
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 5 ends

Bituminous Density
Test Method:

MK Reviewed
Report Date: 11/15/2024
Report #: BNG-000003
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 6 of 10 ends

DRAFT

Page 351 of 872 ends

Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.

Min/Max
Comp.
(%) Remark
Gauge
SN Technician
36 11/05/24 Pavement - Bottom Lift:

See site plan for rough
test locations
3/4" HMA
Type A
with 15%
RAP
3 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
144.5 Backscatter 94 91 / 98 M36046725 Matt Lagerstrom
37 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP

2.5 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
142.1 Backscatter 93 92 / 98 M36046725 Matt Lagerstrom
38 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
144.1 Backscatter 94 92 / 98 M36046725 Matt Lagerstrom
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 2 of 5 ends

Bituminous Density
Test Method:

MK Reviewed
Report Date: 11/15/2024
Report #: BNG-000003
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 7 of 10 ends

DRAFT

Page 352 of 872 ends

Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.

Min/Max
Comp.
(%) Remark
Gauge
SN Technician
39 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
143.5 Backscatter 94 92 / 98 M36046725 Matt Lagerstrom
40 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
142.6 Backscatter 93 92 / 98 M36046725 Matt Lagerstrom
41 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
142.3 Backscatter 93 92 / 98 M36046725 Matt Lagerstrom
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 3 of 5 ends

Bituminous Density
Test Method:

MK Reviewed
Report Date: 11/15/2024
Report #: BNG-000003
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 8 of 10 ends

DRAFT

Page 353 of 872 ends

Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.

Min/Max
Comp.
(%) Remark
Gauge
SN Technician
42 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
144.1 Backscatter 94 92 / 98 M36046725 Matt Lagerstrom
43 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
143.8 Backscatter 94 92 / 98 M36046725 Matt Lagerstrom
44 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
142.4 Backscatter 93 92 / 98 M36046725 Matt Lagerstrom
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 4 of 5 ends

Bituminous Density
Test Method:

MK Reviewed
Report Date: 11/15/2024
Report #: BNG-000003
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 9 of 10 ends

DRAFT

Page 354 of 872 ends

Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.

Min/Max
Comp.
(%) Remark
Gauge
SN Technician
45 11/05/24 Pavement - Other: See
site plan for rough test
locations
1/2" HMA
Type A
with 15%
RAP
2 153.2 1/2"
HMA
(Teichert
,
Vernalis)
10-16-24
/
Maximu
m Theo
AASHTO
T209
143.8 Backscatter 94 92 / 98 M36046725 Matt Lagerstrom
Remarks Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter" Gauge Information
Gauge SN Make Model Density Count Moisture Count Standard Count Date Last Calibration Date Last Calibrated By M36046725 CPN MC-3 21295 18119 11/05/24 06/04/24 CPN International - Instrotek The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 5 of 5 ends

Bituminous Density
Test Method:

MK Reviewed
Report Date: 11/15/2024
Report #: BNG-000003
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

City of Brentwood Sand Creek Road Extension
CIP336-31700
C00000885
Brentwood, CA 99999
399 Lindbergh Avenue Sand Creek Road
Livermore, CA 94551
Phone: 925-315-3151
Livermore

Page 10 of 10 ends

DRAFT

Page 355 of 872 ends

Statement of Qualifications BSK Proposal No. P25000369
Geotechnical/Construction Materials Testing Services April 10, 2025 Brentwood, California

APPENDIX C
DRAFT

STRUCTURAL TESTS & INSPECTION SCHEDULE

Page 356 of 872 ends

SPECIAL INSPECTION &

TESTING AGREEMENT
Neighborhood
Services
Effective:

Revised: May 7, 2018
150 City Park Wy, Brentwood, CA 94513 (925) 516-5405 Voice (925) 516-5407 Fax

STRUCTURAL TESTS & INSPECTIONS SCHEDULE
REINFORCING STEEL:
__ Tensile & Bond
__ Inspection of Placement
__ Inspection of Welding
STRUCTURAL STEEL:
__ Sample & Test
__ Shop Indent. & Welding Inspection
__ Shop Ultrasonic Inspection
__ Shop Radiography
__ Field Welding Inspection
__ Field Bolting
__ Field Ultrasonic Inspection
__ Field Radiography
__ Metal Deck Welding Inspection
MASONRY:
__ Preliminary Acceptance Tests (masonry units, wall prisms) __ Subsequent Tests (mortar, grout, field wall prisms)
__ Inspection of Grouting
__ Inspection of Placement & Grouting
Conc ShotͲ
crete
Grout Mortar
Agg. Tests for Designs
Suitability of Agg.
Mix Designs
Test Panel
Batch Plant Insp.

Cement Grab Sample
Inspect Placing
Compression Tests
Cast Specimens
PickͲup Samples
Shrinkage Bars
Yield Check
Air Check
Dry Unit Weight
PILING, CAISSONS, CAPS, TIES:
__ Inspection of Reinforcing Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
STRUCTURAL HARDWARE:
__ Holdown Installation
__ Tiedown System Installation
__ Epoxied Anchors & Bolts
INSULATING CONCRETE:
__ Sample & Tests
__ Unit Weights
FIREPROOFING:
__ Inspection of Placement
__ Density Tests
__ Thickness Tests
__ Inspect Batching
GEOTECHNICAL: (Inspections & Testing by Geotechnical Engineer) __ Fill Material Acceptance Tests
__ MoistureͲDensity Determination
__ Field Density/Compaction
__ Pier Drilling
__ Observation & Testing by Soils Engineer
UNDERPINNING:
__ Inspection of Steel Fabrication
__ Inspection of Reinforcing & Forms
__ Inspection of Concrete Placement
__ Inspection of Tiebacks
ROOFING & WATERPROOFING:
__ Inspection of Placement
__ Sample & Test
__ Basement Waterproofing
CONCRETE, GUNITE, GROUT & MORTAR:
PRECAST CONCRETE:
__ Reinforcement Tests
__ Inspection of Reinforcing Placement
__ Tendon Tests
__ Inspection of Tendon Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
__ Inspection of Panel Attach & Inserts
__ Inspection of Panel Installation
__ Compression Tests
__ Inspection of Stressing/Transfer
STRUCTURAL WOOD:
__ Inspection of Fabrication
__ Inspection of Truss Joist Fab.
__ Sample & Test Components
__ Inspection of GluͲlam Fab.
__ Shearwall Construction & Nailing
OTHER TESTS OR INSPECTIONS:
____________________________________________________
____________________________________________________
____________________________________________________
DRAFT
$PNQMFUFUIJTQBHFPOMZBOESFUVSOXJUITVCNJUUBM
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Post-installed anchors/dowels x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x
x x x x
x x x
x x x x
x

Page 357 of 872 ends

Statement of Qualifications BSK Proposal No. P25000369
Geotechnical/Construction Materials Testing Services April 10, 2025 Brentwood, California

APPENDIX D
DRAFT

BSK RATE SCHEDULE

Page 358 of 872 ends

PROFESSIONAL STAFF 2025 2026 2027 2028
Principal $ 314.00 $ 330.00 $ 347.00 $ 364.00
Senior Professional $ 276.00 $ 290.00 $ 305.00 $ 320.00 Project Professional II $ 259.00 $ 272.00 $ 286.00 $ 300.00 Project Professional I $ 221.00 $ 232.00 $ 244.00 $ 256.00 Staff Professional II $ 193.00 $ 203.00 $ 213.00 $ 224.00 Staff Professional I $ 171.00 $ 180.00 $ 189.00 $ 198.00 Project Administrator $ 122.00 $ 128.00 $ 134.00 $ 141.00 Administrative Assistant / Clerical $ 110.00 $ 116.00 $ 122.00 $ 128.00 Seismic GIS $ 243.00 $ 255.00 $ 268.00 $ 281.00
GIS Specialist $ 210.00 $ 221.00 $ 232.00 $ 244.00
Information Specialist II $ 198.00 $ 208.00 $ 218.00 $ 229.00 Information Specialist I $ 176.00 $ 185.00 $ 194.00 $ 204.00 CAD $ 132.00 $ 139.00 $ 146.00 $ 153.00
Litigation support
TECHNICAL STAFF 2025 2026 2027 2028
Group 1 - Special Inspector $ 198.00 $ 208.00 $ 218.00 $ 229.00 Group 2 - Special Inspector $ 188.00 $ 197.00 $ 207.00 $ 217.00 Group 3 - Engineering Technician $ 167.00 $ 175.00 $ 184.00 $ 193.00 Group 3 - Geotechnical Professional $ 204.00 $ 214.00 $ 225.00 $ 236.00 Group 3 - Environmental Professional $ 204.00 $ 214.00 $ 225.00 $ 236.00 Group 4 - Technician $ 146.00 $ 153.00 $ 161.00 $ 169.00 Ground Penetrating Radar Scanning Technician $ 348.00 $ 365.00 $ 383.00 $ 402.00 Core Drilling Technician $ 270.00 $ 284.00 $ 298.00 $ 313.00 Floor Flatness Testing Technician $ 232.00 $ 244.00 $ 256.00 $ 269.00 Sample Pickup / Transportation / Delivery $ 132.00 $ 139.00 $ 146.00 $ 153.00 Laboratory Technician $ 144.00 $ 151.00 $ 159.00 $ 167.00

PERSONNEL RATES

1.5x standard rate
2025-2028 BSK Rate Schedule Page 1 of 7
DRAFT

Page 359 of 872 ends

BASIS OF CHARGES FOR FIELD TECHNICIAN SERVICES 2025 2026 2027 2028 Field Work from 0 to 4 hours
Field Work from 4 to 6 hours
Field Work from 6 to 8 hours
Field Work over 8 hours / Saturdays
Sundays, holidays and over 12 hours
Show-up time (no work performed), minimum charge
Sample or cylinder pickup, minimum charge
REIMBURSABLES 2025 2026 2027 2028
Mileage - 2x2 vehicle (Portal to Portal)
Mileage - 4x4 vehicle (Portal to Portal)
Per Diem (as required)
Bridge Toll
Parking Fees
Subconsultant/Subcontractor Services, Vendors, and Expenses BSK SERVICES / DIR / PREVAILING WAGE ADMINISTRATION FEES 2025 2026 2027 2028 Certified Payroll / DIR Upload (Monthly) - per project $ 315.00 $ 331.00 $ 348.00 $ 365.00 Non-Performance Certified Payroll / DIR Upload (Monthly) - per project $ 105.00 $ 110.00 $ 116.00 $ 122.00 Subcontractor Management / Compliance Forms (Monthly) - per project $ 105.00 $ 110.00 $ 116.00 $ 122.00 Additional LCP Tracker or Other Compliance Software (Monthly) - per project $ 210.00 $ 221.00 $ 232.00 $ 244.00 Additional Special Forms, as required (Monthly) - per project $ 158.00 $ 166.00 $ 174.00 $ 183.00 Cost + 15%

OTHER RATES
$1.00/mile or the IRS rate + 15%, whichever is higher
Quote / $300.00 min.

Cost + 15%
Cost + 15%
Bill 4 hours
Bill 6 hours
Bill 8 hours
Night Shift (Shift commencing after 2pm / before 4am)
Bill 2 hours
$2.00/mile or the IRS rate + 15%, whichever is higher
Bill time and a half base rate (1.5x)
Base Rate x 12.5%
Bill two times base rate (2x)
Bill 2 hours
2025-2028 BSK Rate Schedule Page 2 of 7
DRAFT

Page 360 of 872 ends

EQUIPMENT USAGE FEES 2025 2026 2027 2028
Nuclear Gauge (Day) $ 78.00 $ 82.00 $ 86.00 $ 90.00
Skidmore Wilhelm Calibrator (Day) $ 78.00 $ 82.00 $ 86.00 $ 90.00 NDT Weld Testing Equipment - UT/MT/PT (Day) $ 78.00 $ 82.00 $ 86.00 $ 90.00 Proof Load Testing Equipment (Day) $ 78.00 $ 82.00 $ 86.00 $ 90.00 Torque Wrench (Day) $ 78.00 $ 82.00 $ 86.00 $ 90.00
GPR Scanning Equipment (Day) $ 358.00 $ 376.00 $ 395.00 $ 415.00 Rebar Locator/Pachometer (Day) $ 141.00 $ 148.00 $ 155.00 $ 163.00 Hand Auger (Day) $ 166.00 $ 174.00 $ 183.00 $ 192.00
Water Meter (Day) $ 71.00 $ 75.00 $ 79.00 $ 83.00
Hand-held GPS (Day) $ 107.00 $ 112.00 $ 118.00 $ 124.00 Drilling Kit - Paint, stakes and lath - (Project) $ 38.00 $ 40.00 $ 42.00 $ 44.00 Drilling Supplies - Tubes / Caps (Project) $ 386.00 $ 405.00 $ 425.00 $ 446.00 Manometer (Day) $ 272.00 $ 286.00 $ 300.00 $ 315.00
Double Ring Infiltrometer (Day) $ 704.00 $ 739.00 $ 776.00 $ 815.00 ANALYSIS SOFTWARE USAGE FEES 2025 2026 2027 2028
gINT (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
LPile (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
APile (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
SHAFT (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
GROUP (Project) $ 140.00 $ 147.00 $ 154.00 $ 162.00
Cliq (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
LiquefyPro (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
LiqIT (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
Slide (Project) $ 140.00 $ 147.00 $ 154.00 $ 162.00
Settle3D (Project) $ 140.00 $ 147.00 $ 154.00 $ 162.00
Cpet-IT (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
LiqSVs (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
ArcGIS (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
Surfer (Project) $ 71.00 $ 75.00 $ 79.00 $ 83.00
Seep/W (Project) $ 140.00 $ 147.00 $ 154.00 $ 162.00

OTHER RATES (CONTINUED)
2025-2028 BSK Rate Schedule Page 3 of 7
DRAFT

Page 361 of 872 ends

SOILS 2025 2026 2027 2028
Modified or Standard Proctor - 4" or 6" Mold (ASTM / AASHTO) $ 353.00 $ 371.00 $ 390.00 $ 410.00 Proctor with Oversize Material (ASTM / AASHTO) $ 441.00 $ 463.00 $ 486.00 $ 510.00 Proctor Check Point (All Methods) $ 189.00 $ 198.00 $ 208.00 $ 218.00 Caltrans Maximum Wet Density (CT 216) $ 298.00 $ 313.00 $ 329.00 $ 345.00 Minus 200 Wash Soil (ASTM D1140) $ 116.00 $ 122.00 $ 128.00 $ 134.00 Moisture Content of Soils (ASTM D2216) $ 49.00 $ 51.00 $ 54.00 $ 57.00 Plasticity Index (ASTM D4318) $ 305.00 $ 320.00 $ 336.00 $ 353.00 Expansion Index of Soils (UBC No. 29) $ 327.00 $ 343.00 $ 360.00 $ 378.00 Collapse Potential of Soils (ASTM D2435) $ 284.00 $ 298.00 $ 313.00 $ 329.00 Organic Impurities (ASTM C40 / CT 213) $ 116.00 $ 122.00 $ 128.00 $ 134.00 Tube Density & Moisture Content of Soil $ 60.00 $ 63.00 $ 66.00 $ 69.00 Visual Classification (ASTM D2488) $ 60.00 $ 63.00 $ 66.00 $ 69.00 Hydrometer (ASTM D422 / CT 203) $ 331.00 $ 348.00 $ 365.00 $ 383.00 Double Hydrometer (ASTM D4221) $ 435.00 $ 457.00 $ 480.00 $ 504.00 Uncompacted Void Content (CT 234 / AASHTO T304) $ 154.00 $ 162.00 $ 170.00 $ 179.00 Sand Density Calibration (ASTM D1566) $ 243.00 $ 255.00 $ 268.00 $ 281.00 Minimum Resistivity of Soils (CT 643) $ 195.00 $ 205.00 $ 215.00 $ 226.00 Consolidation (ASTM D2435) 2/2 Time Rates $ 581.00 $ 610.00 $ 641.00 $ 673.00 Consolidation (ASTM D2435) w/ No Tim Rates $ 386.00 $ 405.00 $ 425.00 $ 446.00 Uncofined Compression Strength, Soil (ASTM D2166) $ 154.00 $ 162.00 $ 170.00 $ 179.00 Remolded Consolidation (ASTM D2435) $ 491.00 $ 516.00 $ 542.00 $ 569.00 Minimum Index Density Soils (ASTM D4254) $ 96.00 $ 101.00 $ 106.00 $ 111.00 Direct Shear Remolded (ASTM D3080) $ 364.00 $ 382.00 $ 401.00 $ 421.00 Direct Shear (ASTM D3080) $ 305.00 $ 320.00 $ 336.00 $ 353.00 Remolded Direct Shear (ASTM D3080) $ 364.00 $ 382.00 $ 401.00 $ 421.00 Remolded Flexwall Perm (ASTM D5084) $ 776.00 $ 815.00 $ 856.00 $ 899.00 % Crushed Particles / Fractured Particles (CT 205/AASHTO T335) $ 229.00 $ 240.00 $ 252.00 $ 265.00 '% Flat & Elongated (ASTM D4791) $ 175.00 $ 184.00 $ 193.00 $ 203.00 Minus 200 Wash/Aggregate (ASTM C117) $ 116.00 $ 122.00 $ 128.00 $ 134.00 Sieve Analysis w/ Wash (ASTM C136 / CT 202 / AASHTO T27) $ 237.00 $ 249.00 $ 261.00 $ 274.00 Sieve Analysis - Coarse Only (ASTM C136 / CT 202 / AASHTO T27) $ 116.00 $ 122.00 $ 128.00 $ 134.00 Coarse Specific Gravity / Absorption (ASTM C127/CT 206/AASHTO T85) $ 221.00 $ 232.00 $ 244.00 $ 256.00 Fine Specific Gravity / Absorption (ASTM C128/CT 207/AASHTO T84) $ 221.00 $ 232.00 $ 244.00 $ 256.00 Sand Equivalent (ASTM D2419 / CT 217 / AASHTO T176) $ 175.00 $ 184.00 $ 193.00 $ 203.00 Durability Index (CT 229) $ 348.00 $ 365.00 $ 383.00 $ 402.00

MATERIALS LABORATORY TEST RATES
2025-2028 BSK Rate Schedule Page 4 of 7
DRAFT

Page 362 of 872 ends

SOILS (CONTINUED) 2025 2026 2027 2028
Abrasion by LA Rattler, Large Size (ASTM C131/CT 211/AASHTO T96) $ 397.00 $ 417.00 $ 438.00 $ 460.00 Abrasion by LA Rattler, Small Size (ASTM C131/CT 211/AASHTO T96) $ 327.00 $ 343.00 $ 360.00 $ 378.00 Cleanness Value of Aggregate (CT 227) $ 250.00 $ 263.00 $ 276.00 $ 290.00 Aggregate Wt pcf Compacted (ASTM C 29) $ 123.00 $ 129.00 $ 135.00 $ 142.00 Gradation-Rip Rap - Per Sieve (D5519-Method A) $ 313.00 $ 329.00 $ 345.00 $ 362.00 Sodium Sulfate Soundness-Min. Charge (ASTM C88/CT 214/AASHTO T104) $ 485.00 $ 509.00 $ 534.00 $ 561.00 Sodium Sulfate Soundness-Per Sieve (ASTM C88/CT 214/AASHTO T104) $ 154.00 $ 162.00 $ 170.00 $ 179.00 R-Value of Soils (CT 301) $ 497.00 $ 522.00 $ 548.00 $ 575.00 Soil Cement Compression - Set (ASTM D1633) $ 331.00 $ 348.00 $ 365.00 $ 383.00 CIR / FDR Compressive Strength Testing - Set $ 331.00 $ 348.00 $ 365.00 $ 383.00 CIR / FDR Sample Preparation / Compaction $ 303.00 $ 318.00 $ 334.00 $ 351.00 CBR (ASTM D1883/AASHTO T-180) $ 1,379.00 $ 1,448.00 $ 1,520.00 $ 1,596.00 Preparation of Soil-Cement Samples $ 1,044.00 $ 1,096.00 $ 1,151.00 $ 1,209.00 Soluble Sulfate Chloride & Sulfide $ 181.00 $ 190.00 $ 200.00 $ 210.00 pH Sulphate & Chloride $ 91.00 $ 96.00 $ 101.00 $ 106.00 % Lumps/Friable Particles (ASTM C142) $ 112.00 $ 118.00 $ 124.00 $ 130.00 '% Organics in Soil (ASTM D2974) $ 190.00 $ 200.00 $ 210.00 $ 221.00 HOT MIX ASPHALT 2025 2026 2027 2028
JMF Mix Design, Superpave / Caltrans $ 12,430.00 $ 13,052.00 $ 13,705.00 $ 14,390.00 JMF Verification - HMA - Superpave / Caltrans $ 7,203.00 $ 7,563.00 $ 7,941.00 $ 8,338.00 JMF Production Startup - Superpave / Caltrans $ 6,701.00 $ 7,036.00 $ 7,388.00 $ 7,757.00 RAP Material Testing - Additional Fee $ 872.00 $ 916.00 $ 962.00 $ 1,010.00 Rubberized RHMA Material - Additional Fee $ 2,011.00 $ 2,112.00 $ 2,218.00 $ 2,329.00 JMF Mix Design, HVEEM $ 4,300.00 $ 4,515.00 $ 4,741.00 $ 4,978.00 JMF Mix Design, Marshall $ 5,101.00 $ 5,356.00 $ 5,624.00 $ 5,905.00 Open Graded Asphalt Optimum Bitumen Content (CT 368) $ 3,070.00 $ 3,224.00 $ 3,385.00 $ 3,554.00 Gyratory Compaction - Set of 3 (AASHTO T312) $ 464.00 $ 487.00 $ 511.00 $ 537.00 Hamburg Wheel Track (AASHTO T324) $ 2,756.00 $ 2,894.00 $ 3,039.00 $ 3,191.00 Tensile Strength Ratio (CT 371 / AASHTO T283) $ 1,521.00 $ 1,597.00 $ 1,677.00 $ 1,761.00 Marshall Maximum Density (ASTM D6926) $ 405.00 $ 425.00 $ 446.00 $ 468.00 Marshall Stability & Flow (ASTM D6927) $ 348.00 $ 365.00 $ 383.00 $ 402.00 Bitumen Content - Ignition (ASTM D6307 / CT382 / AASHTO T308) $ 311.00 $ 327.00 $ 343.00 $ 360.00 Oil Content Correction Factor (ASTM D6307 / CT 382 / AASHTO T308) $ 723.00 $ 759.00 $ 797.00 $ 837.00 Gradation from Extraction (ASTM D5444 / AASHTO T30) $ 189.00 $ 198.00 $ 208.00 $ 218.00

MATERIALS LABORATORY TEST RATES (CONTINUED)
2025-2028 BSK Rate Schedule Page 5 of 7
DRAFT

Page 363 of 872 ends

HOT MIX ASPHALT (CONTINUED) 2025 2026 2027 2028
Bulk Specific Gravity (CT308 / AASHTO T275 / ASTM D2726) $ 88.00 $ 92.00 $ 97.00 $ 102.00 HMA Theo. Max Density Rice Method (ASTM D2041 / CT 309 / AASHTO T209) $ 348.00 $ 365.00 $ 383.00 $ 402.00 Volumetric Calculations (VMA, VFA, DP, AV, Eff. Calcs) $ 74.00 $ 78.00 $ 82.00 $ 86.00 Moisture Content of Asphalt (CT 370 / AASHTO T329) $ 91.00 $ 96.00 $ 101.00 $ 106.00 Film Stripping $ 123.00 $ 129.00 $ 135.00 $ 142.00
Compaction/Preparation of HMA Briquette (CT 304) $ 305.00 $ 320.00 $ 336.00 $ 353.00 Stabilometer Value - Set of 3 (CT366) $ 386.00 $ 405.00 $ 425.00 $ 446.00 Lab Mixed TSR - Moisture Induced Damage (AASHTO T283 / CT 371) $ 2,040.00 $ 2,142.00 $ 2,249.00 $ 2,361.00 Calculated AC Maximum Density (CT 367) $ 138.00 $ 145.00 $ 152.00 $ 160.00 Thickness Determination of AC Cores $ 29.00 $ 30.00 $ 32.00 $ 34.00 CONCRETE & MASONRY 2025 2026 2027 2028
Compression Test Concrete - Per Cylinder (ASTM C39) $ 39.00 $ 41.00 $ 43.00 $ 45.00 Compression Test Concrete - Set of 4/5 (ASTM C39) $ 189.00 $ 198.00 $ 208.00 $ 218.00 Compression Test of Core (ASTM C42) $ 84.00 $ 88.00 $ 92.00 $ 97.00 Compressive Strength of Shotcrete Panel $ 441.00 $ 463.00 $ 486.00 $ 510.00 Compression Test Composite CMU Prism (1) $ 229.00 $ 240.00 $ 252.00 $ 265.00 Compression Test Grout (Set of 4) $ 167.00 $ 175.00 $ 184.00 $ 193.00 Compression Test Mortar (Set of 3) $ 152.00 $ 160.00 $ 168.00 $ 176.00 Flexural Test per Beam (ASTM C78 / CT 523) $ 124.00 $ 130.00 $ 137.00 $ 144.00 Linear Shrinkage - Set of 3 (ASTM C157) $ 551.00 $ 579.00 $ 608.00 $ 638.00 Unit Weight Lt Wt Concrete (ASTM C567) $ 78.00 $ 82.00 $ 86.00 $ 90.00 Splitting Tensile Strength of Concrete (ASTM C496) $ 166.00 $ 174.00 $ 183.00 $ 192.00 Compressive Strength CMU Block (ASTM C140) $ 265.00 $ 278.00 $ 292.00 $ 307.00 Comp. Strength, SG, & Abs. of CMU - Per Block (ASTM C140) $ 305.00 $ 320.00 $ 336.00 $ 353.00 Masonry Linear Shrinkage (ASTM C426) $ 559.00 $ 587.00 $ 616.00 $ 647.00 Masonry Core Shear Test (Title 24) $ 260.00 $ 273.00 $ 287.00 $ 301.00

MATERIALS LABORATORY TEST RATES (CONTINUED)
2025-2028 BSK Rate Schedule Page 6 of 7
DRAFT

Page 364 of 872 ends

METALS & FIREPROOFING 2025 2026 2027 2028
Tensile & Bend of Rebar #3-11 $ 205.00 $ 215.00 $ 226.00 $ 237.00 Slip and Tensile Rebar Couplers (CT 670) $ 298.00 $ 313.00 $ 329.00 $ 345.00 Bolt Proof & Ultimate Load $ 355.00 $ 373.00 $ 392.00 $ 412.00 Bolt Hardness - Set of 3 $ 236.00 $ 248.00 $ 260.00 $ 273.00 Nut Proof Load - Set of 3 $ 355.00 $ 373.00 $ 392.00 $ 412.00 Nut Hardness - Set of 3 $ 236.00 $ 248.00 $ 260.00 $ 273.00 Washer Hardness - Set of 3 $ 236.00 $ 248.00 $ 260.00 $ 273.00 Dry Density Fireproofing (ASTM E605) $ 131.00 $ 138.00 $ 145.00 $ 152.00 Brinell Hardness of Steel (ASTM E10) $ 138.00 $ 145.00 $ 152.00 $ 160.00 Rockwell Hardness of Steel (ASTM E18) $ 138.00 $ 145.00 $ 152.00 $ 160.00 Face Bend of Steel Coupon $ 84.00 $ 88.00 $ 92.00 $ 97.00 Root Bend of Weld Coupon $ 84.00 $ 88.00 $ 92.00 $ 97.00 Side Bend of Weld Coupon $ 84.00 $ 88.00 $ 92.00 $ 97.00 Tensile Test of Steel Coupon $ 116.00 $ 122.00 $ 128.00 $ 134.00 Bend Test of Steel Coupon $ 100.00 $ 105.00 $ 110.00 $ 116.00 Adhesion / Cohesion Fireproofing Materials $ 175.00 $ 184.00 $ 193.00 $ 203.00 ESCALATION: The rates presented herein are subject to an annual escalation rate of 5% effective on January 1st of each year subsequent to December 31, 2028.

MATERIALS LABORATORY TEST RATES (CONTINUED)
2025-2028 BSK Rate Schedule Page 7 of 7
DRAFT

Page 365 of 872 ends

Statement of Qualifications BSK Proposal No. P25000369
Geotechnical/Construction Materials Testing Services April 10, 2025 Brentwood, California

APPENDIX E
DRAFT

SAMPLE CERTIFICATE OF INSURANCE

Page 366 of 872 ends

ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $
PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $
DED RETENTION $ PER OTH- STATUTE ER
E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
4/30/2024
License # 0E67768
(925) 416-7862
13056
BSK Associates
691 N Laverne Ste 101
Fresno, CA 93650
35300
A 1,000,000
PSB0011135 5/1/2024 5/1/2025 1,000,000
10,000
1,000,000
2,000,000
2,000,000
A 1,000,000
PSA0003650 5/1/2024 5/1/2025
A 5,000,000
CKB0200237 5/1/2024 5/1/2025 5,000,000
A
PSW0006016 5/1/2024 5/1/2025 1,000,000
1,000,000
1,000,000
B Professional Liab. USF05392824 5/1/2024 Per Claim/Aggregate 3,000,000 B Pollution Liability USF05392824 5/1/2024 5/1/2025 Limit 3,000,000 Proof of Insurance Only
Proof of Insurance
BSKASSO-01 SUMMANR
IOA Insurance Services
3875 Hopyard Road
Suite 200
Pleasanton, CA 94588
Rita Summan
[email protected]
RLI Insurance Company
Allianz Global Risks US Insurance Company
X
5/1/2025
X
X
X
X
X
X
X
X
DRAFT

Page 367 of 872 ends

Policy # PSB0011135
DRAFT

Page 368 of 872 ends

Policy # PSW0006016
DRAFT

Page 369 of 872 ends

Policy # PSA0003650
DRAFT

Page 370 of 872 ends

PSA_PW_City Attorney Approved Version 053025

AGREEMENT FOR GEOTECHINICAL/CONSTRUCTION MATERIALS TESTING SERVICES Construction Testing Services, Inc.

THIS AGREEMENT is made and entered into as of the _____ day of __________________, 20_____ by and between the City of Brentwood, a municipal corporation of the State of California ("City"), and Construction Testing Services, Inc., a California Corporation ("Consultant") (each a “Party” and collectively, the “Parties”).

RECITALS
A. City requires the professional services of a consultant specifically trained and experienced in geotechnical/construction materials testing services, which are professional services outside of services offered by City.

B. Consultant has the professional skills and experience necessary to perform the services described in this Agreement.

C. Consultant customarily engages in these services as part of its independently established trade, occupation, and/or business, separately from its work for City.

D. City desires to engage Consultant to provide these services because of its qualifications and experience in performing such services
E. Consultant has submitted a proposal to City and has affirmed its willingness and ability to perform such work on the terms and manner set forth in this Agreement.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, the Parties agree as follows:

1. Scope of Work.

1.1 City retains Consultant, as an independent contractor, to perform, and Consultant agrees to render, those services (the "Services") that are described in the attached Exhibit "A," which is incorporated by this reference, pursuant to this Agreement’s terms and conditions.

1.2 Consultant will control the manner and the means of the work to be performed, and be responsible for the professional quality, technical accuracy and coordination of the Services. Consultant will, without additional compensation, correct or revise any errors or deficiencies in the Services.

1.3. Consultant will keep City informed on a regular basis that the Services are being performed in accordance with the requirement and intentions of this Agreement.

1.4 If applicable, Consultant has designated those persons listed in Exhibit “A” to provide the Services to the City. Consultant will not change or reassign those persons described in Exhibit “A” without prior written notice to City, and will not replace those individuals with individuals to whom City has a reasonable objection.

2. Standard of Performance. Consultant acknowledges that in entering into this Agreement the City is relying on Consultant's special skills and experience to do and perform the Services. While performing the Services, Consultant will exercise the reasonable professional care and skill customarily exercised by reputable members of Consultant's profession practicing in the Northern California area. The acceptance of the Services by City does not release Consultant from these obligations.

Consultant will be responsible for employing or engaging all persons necessary to perform the Services.

Consultant will control the manner and means of the services to be performed by its employees and subconsultants. All of Consultant's staff will be qualified by training and experience to perform their DRAFT

Page 371 of 872 ends

2 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx assigned tasks. Consultant will give its personal attention to the fulfillment of the provisions of this Agreement by all of its employees and subcontractors, if any, and will keep the Services under its control.

On demand of City, if any employee or subcontractor of Consultant fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the Services.

3. Term. Unless earlier terminated, the term of this Agreement will be effective from July 1, 2025 through June 30, 2026. The City Manager may amend the Agreement to extend it for two (2) additional one (1) year periods or parts thereof in an amount not to exceed two hundred thousand dollars ($200,000) per Agreement year. Extensions will be based upon a satisfactory review of Consultant's performance, City needs, and appropriation of funds by the City Council. The parties will prepare a written amendment indicating the effective date and length of the extended Agreement.

4. Schedule. Consultant will generally adhere to the schedule set forth in Exhibit “A” provided, that City will grant reasonable extensions of time for the performance of the Services occasioned by unusually lengthy governmental reviews of Consultant’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Consultant’s officers or employees.

Consultant acknowledges the importance to City of City’s project schedule and agrees to put forth its best professional efforts to perform the Services in a manner consistent with that schedule. City understands, however, that Consultant’s performance must be governed by sound practices. Consultant will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

5. Compensation.

5.1 The total fee payable for the Services to be performed during the term of this Agreement will be a not to exceed amount of two hundred thousand dollars ($200,000) as may be further specified in the attached Exhibit “A.” No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City reserves the right to withhold a ten percent (10%) retention until City has accepted the Services.

5.2 Payment will occur only after receipt by City of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City.

5.3 Within thirty (30) days after receipt of any applicable progress payment request, City will verify the accuracy of the request, correct the charges where appropriate, and make payment to Consultant in an amount equal to the amount of such application, as verified or corrected by City. No payment made prior to completion and acceptance of the Services will constitute acceptance of any part of the Services.

City reserves the right to withhold payment from Consultant because of Services not performed satisfactorily, delays in Consultant's performance of Services, or other defaults hereunder.

6. Status of Consultant. Consultant will perform the Services as an independent contractor, free from the control and direction of City, in pursuit of Consultant’s independent calling, and not as an employee of City. The persons used by Consultant to provide the Services under this Agreement will not be considered employees of City for any purposes whatsoever and City will not pay any tax, workers’ compensation insurance, retirement contributions or unemployment contributions on behalf of Consultant or its employees or subcontractors. Consultant agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers’ compensation payment, including, but not limited to, those based on any provision of the Federal Affordable Care Act, which City may be required to make on behalf of Consultant or any agent, employee, or contractor of Consultant for work done under this Agreement. The payment made to Consultant pursuant to the Agreement will be the full and complete compensation to which Consultant is entitled. City will not make any federal or state tax withholdings on behalf of Consultant or its agents, employees or subcontractors.

DRAFT

Page 372 of 872 ends

3 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Consultant.

7. Subcontracting. Consultant's services are being requested by City because they are unique and personal. Except as may be specified in Exhibit “A”, Consultant will not subcontract any portion of the Services without prior written approval of City Manager or their designee. If Consultant subcontracts any of the Services, Consultant will be fully responsible to City for the acts, errors and omissions of Consultant's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Consultant is for the acts and omissions of persons directly employed by Consultant. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Consultant and City.

Consultant will be responsible for payment of subcontractors. Consultant will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Consultant's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

8. Other Consultants. The City reserves the right to employ other consultants in connection with the Services.

9. Indemnification. Consultant agrees to indemnify, including the cost to defend, City, its officers, agents, volunteers and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this Agreement, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful misconduct or defects in design by City or the agents, servants, or independent contractors who are directly responsible to City, or arising from the active negligence of City.

10. Insurance. Consultant will obtain and maintain, at its cost and expense, for the duration of the Agreement and any amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the Services by Consultant or Consultant’s agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A:VII."

10.1 Coverages and Limits. Consultant will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Consultant's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Consultant pursuant to this Agreement are adequate to protect Consultant. The coverage will contain no special limitations on the scope of its protection to the above-designated insureds except for Workers Compensation and errors and omissions insurance. Consultant will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Consultant believes that any required insurance coverage is inadequate, Consultant will obtain such additional insurance coverage, as Consultant deems adequate, at Consultant's sole expense.

10.1.1 Commercial General Liability Insurance. $2,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

10.1.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

10.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Consultant has no employees and provides, to City's satisfaction, a declaration stating this.

DRAFT

Page 373 of 872 ends

4 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

10.1.4 Professional Liability. Errors and omissions liability appropriate to Consultant’s profession with limits of not less than $1,000,000 per claim.

10.2 Endorsements. For Commercial General Liability Insurance, Consultant will ensure that the policies are endorsed to name the City, its officers, agents, volunteers and employees as additional insureds. Prior to City's execution of this Agreement, Consultant will furnish, to the satisfaction of the City, certificates of insurance and endorsements.

10.3 Cancellation. Insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent pursuant to the notice provisions of this Agreement.

10.4 Failure to Maintain Coverage. If Consultant fails to maintain any of these insurance coverages, then City will have the option to declare Consultant in breach of this Agreement, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Consultant is responsible for any payments made by City to obtain or maintain insurance and City may collect these payments from Consultant or deduct the amount paid from any sums due Consultant under this Agreement.

10.5 Submission of Insurance Policies. City reserves the right to require, at any time, complete and certified copies of any or all required insurance policies and endorsements.

10.6 Primary Coverage. For any claims related to the Services and this Agreement, the Consultant’s insurance coverage will be primary insurance with respect to City, its officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City for itself, its officers, agents, volunteers and employees, will be in excess of Consultant’s insurance and not contributory with it.

10.7 Reduction in Coverage/Material Changes. Consultant will notify City in writing pursuant to the notice provisions of this Agreement thirty (30) days prior to any reduction in any of the insurance coverage required pursuant to this Agreement or any material changes to the respective insurance policies.

10.8 Waiver of Subrogation. The policies will contain a waiver of subrogation for the benefit of City.

11. Business License. If required, Consultant will obtain and maintain a City of Brentwood Business License for the term of the Agreement, as it may be amended from time-to-time.

12. Maintenance of Records. Consultant will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Consultant will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Consultant will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

13. Ownership of Documents.

13.1 All product produced by Consultant or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Consultant or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. Consultant will have the right to make one (1) copy of the Work Product for Consultant’s records.

13.2 The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Consultant; provided, however, that if this Agreement is terminated for any reason prior to completion of the Project and if under such circumstances City uses, DRAFT

Page 374 of 872 ends

5 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx or engages the services of and directs another consultant to use, the Work Product, City agrees to hold Consultant harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Consultant, or anyone for whose acts it is responsible, in preparation of the Work Product. Consultant will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

14. Copyrights. Consultant agrees that all copyrights that arise from the Services will be vested in City and Consultant relinquishes all claims to the copyrights in favor of City.

15. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Consultant will not make any of these documents or information available to any individual or organization not employed by the Consultant or the City without the written consent of the City before any such release.

16. Notices. Any notices relating to this Agreement will be given in writing and will be deemed sufficiently given and served for all purposes when delivered personally, by facsimile or by generally recognized overnight courier service, or five (5) days after deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, addressed as follows:

For City:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Phone No. (925) 516-5307
Attn: Vatsal Patel, Engineering Manager
For Consultant:

Name: Construction Testing Services, Inc.

Title: Vice President of Business
Development
Address: 5027 Commercial Circle, Suite G
Concord, CA 94520
Phone No.: 925-849-8186
Attn: Greg Arellano
Either Party may change its address for purposes of this section by giving the other Party written notice of the new address in the manner set forth above.

17. Conflicts of Interest.

17.1 City will evaluate Consultant’s duties pursuant to this Agreement to determine whether disclosure under the Political Reform Act and City’s Conflict of Interest Code is required of Consultant or any of Consultant’s employees, agents, or subcontractors. Should it be determined that disclosure is required, Consultant or Consultant’s affected employees, agents, or subcontractors will complete and file with the City Clerk those schedules specified by City and contained in the Statement of Economic Interests Form 700.

17.2 Consultant understands that its professional responsibility is solely to City. Consultant warrants that it presently has no interest, present or contemplated, and will not acquire any direct or indirect interest, that would conflict with its performance of this Agreement. Consultant further warrants that neither Consultant, nor Consultant’s agents, employees, subcontractors and consultants have any ancillary real property, business interests or income that will be affected by this Agreement or, alternatively, that Consultant will file with the City an affidavit disclosing this interest. Consultant will not knowingly, and will take reasonable steps to ensure that it does not, employ a person having such an interest in the performance of this Agreement. If after employment of a person, Consultant discovers that it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant will promptly disclose the relationship to the City and take such action as the City may direct to remedy the conflict.

DRAFT

Page 375 of 872 ends

6 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

18. General Compliance with Laws. Consultant will keep fully informed of federal, state and local laws, ordinances, and regulations (“Laws”) that in any manner affect those employed by Consultant, or in any way affect Consultant’s performance of the Services. Consultant will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the Services with all applicable laws, ordinances, and regulations.

19. Pandemic Health Laws. Consultant’s duty to comply with Laws includes compliance by Consultant with all local, state, or federal Laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”), which include all of the County of Contra Costa Health Orders. Failure to fully comply with the Health Laws constitutes a material default, subject to all available remedies including suspension or termination.

20. Discrimination and Harassment Prohibited. Consultant will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment.

21. Labor Code Compliance. If this Agreement exceeds $1,000, it is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, beginning at section 1720, and the related regulations, including but not limited to requirements pertaining to wages, working hours and workers’ compensation insurance. Consultant must also post all job site notices required by laws or regulations pursuant to Labor Code section 1771.4.

21.1 Prevailing Wages. Each worker performing Services under this Agreement that is covered under Labor Code section 1720 or 1720.9, must be paid at a rate not less than the prevailing wage as defined in sections 1771 and 1774 of the Labor Code. The prevailing wage rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. Pursuant to Labor Code section 1775, Consultant and any subconsultant or subcontractor will forfeit to the City as a penalty up to $200 for each calendar day, or portion of a day, for each worker paid less than the applicable prevailing wage rate, in addition to paying each worker the difference between the applicable wage rate and the amount actually paid.

21.2 Working Day. Pursuant to Labor Code section 1810, eight hours of labor consists of a legal day’s work. Pursuant to Labor Code section 1813, Consultant will forfeit to the City as a penalty the sum of $25 for each day during which a worker employed by Consultant or any subconsultant or subcontractor is required or permitted to work more than eight hours during any one calendar day, or more than 40 hours per calendar week, unless such workers are paid overtime wages under Labor Code section 1815.

21.3 Payroll Records. Consultant and its subconsultants or subcontractors must maintain certified payroll records in compliance with Labor Code sections 1771.4, 1776 and 1812, and all implementing regulations promulgated by the Department of Industrial Relations (“DIR”). For each payroll record, Consultant and its subconsultants or subcontractors must certify under penalty of perjury that the information in the record is true and correct, and that it has complied with the requirements of Labor Code sections 1771, 1811, and 1815. Unless the Agreement price is under $25,000, Consultant must electronically submit certified payroll records to the Labor Commissioner as required under California law and regulations.

21.4 Apprentices. If the Agreement price is $30,000 or more, Consultant must comply with the apprenticeship requirements in Labor Code section 1777.5.

21.5 DIR Monitoring, Enforcement, and Registration. The Services are subject to compliance monitoring and enforcement by the DIR pursuant to Labor Code section 1725.5, and, subject to the exception set forth below, Consultant and any subconsultants or subcontractors must be registered with the DIR to perform public works projects. The registration requirements of Labor Code section 1725.5 do not apply if the Agreement price is for under $25,000.

DRAFT

Page 376 of 872 ends

7 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

21.6 Workers’ Compensation Certification. Under Labor Code section 1861, by signing this Agreement Consultant certifies as follows: “I am aware of the provisions of Labor Code section 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work on this contract.”

22. Termination. In the event of the Consultant's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperformance by notifying Consultant in writing pursuant to the notice provisions of this Agreement. Consultant has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Consultant has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Consultant, whether located at the project site, at Consultant's place of business, or at the offices of a subconsultant.

Either Party, upon tendering thirty (30) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Consultant will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Consultant will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

23. Covenants against Contingent Fees. Consultant warrants that Consultant has not employed or retained any company or person, other than a bona fide employee working for Consultant, to solicit or secure this Agreement, and that Consultant has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

24. Claims and Lawsuits. By signing this Agreement, Consultant agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Consultant acknowledges that if a false claim is submitted to City by Consultant, it may be considered fraud and Consultant may be subject to criminal prosecution. Consultant acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. Consultant acknowledges that the filing of a false claim may subject Consultant to an administrative debarment proceeding as the result of which Consultant may be prevented to act as a Consultant on any public work or improvement for a period of up to five (5) years. Consultant acknowledges debarment by another jurisdiction is grounds for City to terminate this Agreement.

25. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Contra Costa, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This agreement will be governed by the laws of the State of California.

26. Testimony. Consultant will testify at City's request if litigation is brought against City in connection with Consultant's services under this agreement. Unless the action is brought by Consultant, or is based upon Consultant's actual or alleged negligence or other wrongdoing, City, upon prior written agreement DRAFT

Page 377 of 872 ends

8 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx with Consultant will compensate Consultant for time spent in preparation for testimony, testimony, and travel at Consultant's standard hourly rates at the time of actual testimony.

27. Successors and Assigns. It is mutually understood and agreed that this Agreement will be binding upon the Parties and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Consultant without the prior written consent of City, which will not be unreasonably withheld.

28. Section Headings. Section headings as used in this Agreement are for convenience only and will not be deemed a part of such sections and will not be construed to change the meaning of the section.

29. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law.

The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

30. Entire Agreement. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to nonmaterial amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties.

31. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Consultant each represent and warrant that they have the legal power, right and actual authority to bind Consultant to the terms and conditions of this Agreement.

DRAFT

Page 378 of 872 ends

9 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

32. Severability. If any term, provision, condition or covenant of this Agreement or its application to any party or circumstances will be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, will not be affected, and will be valid and enforceable to the fullest extent permitted by law.

33. Signatures.

33.1 Counterparts. This Agreement may be executed in two or more counterparts, each of which together will be deemed an original, but all of which together will constitute the same instrument.

33.2 Digital/Electronic Signatures. Using a City-approved method, this Agreement may be executed using digital or electronic signatures in accordance with Government Code Section 16.5. The presence of an electronic signature on this Agreement will be construed as the Parties’ consent to do business electronically.

CONSULTANT:
* By:

Printed Name:

Title:
** By:

Printed Name:

Title:

CITY:

By:

Darin Gale, Interim City Manager
ATTEST:

By:

Amanda McVey, City Clerk
APPROVED AS TO FORM:

By:

Katherine Wisinski, City Attorney
If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, Agreement must be signed by one corporate officer from each of the following two groups. *Group A. **Group B.

Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

If an LLC:
• The Agreement must be signed by a Managing Member or the LLC must attach a resolution empowering the signatory to bind the LLC.

If a partnership:
• The Agreement must be signed by the Managing Partner or the Partner authorized to execute agreements of this type. Additional documentation, such as the partnership agreement, confirming this signature authority may be required.

DRAFT

Page 379 of 872 ends

10 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx If a sole proprietorship:
• The Agreement must be signed by the owner.

DRAFT

Page 380 of 872 ends

11 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx EXHIBIT “A”

SCOPE OF SERVICES
Consultant will perform the following Services, at the rates indicated below.

DRAFT

Page 381 of 872 ends

Statement of Qualifications for
Geotechnical/Construction Materials Testing Services
for Infrastructure Projects (City or Developer Driven)
Submitted By: Greg Arellano
VP of Business Development
650.380.8008 • [email protected]

Construction Testing Services, Inc.
2118 Rheem Drive
Pleasanton, CA 94588
Date: April 10, 2025 925.462.5151 (office) • 925.462.5183 (fax) San Francisco  Oakland  Pleasanton  Sacramento  Stockton  San José DRAFT

Page 382 of 872 ends

TABLE OF CONTENTS
Statement of Qualifications for
Geotechnical/Construction Materials Testing Services
for Infrastructure Projects (City or Developer Driven)
April 10, 2025

1............................................ Letter of Transmittal

2............................................ Subcontractors & Conflict of Interest

3............................................ Submittal Approach

4............................................Appendices:
a. Resumes
b. Rate Schedule
c. Attachment C, Page 3
DRAFT

Page 383 of 872 ends

DRAFT

1. Letter of Transmittal

Page 384 of 872 ends

HEADQUARTERS & FULL-SERVICE LABORATORY: 2118 Rheem Drive • Pleasanton, CA 94588 • Phone 925.462.5151• Fax 925.462.5183 STOCKTON OFFICE: 343 E. Main Street, Suite 711 • Stockton, CA 95202 • Phone 209.507.7555 • Fax 209.507.7554

1. LETTER OF TRANSMITTAL
April 10, 2025
City of Brentwood
Engineering Department
Attention: Vatsal Patel
150 City Park Way, Brentwood, CA 94513
RE: Statement of Qualifications for Geotechnical/Construction Materials Testing Services for Infrastructure Projects (City or Developer Driven), CTS #P28838 Dear Mr. Patel and Team:

Since 1994, Construction Testing Services, Inc. (CTS) has provided geotechnical engineering, special inspections, and materials testing for more than $30 billion worth of construction, including having worked with the City of Brentwood for several previous on-call contracts (2022-2025, 2016-2021, 2011-2013, and 2004-2006).

CTS staff’s knowledge of the City’s terrain as well as your procedures and protocols will allow for ease of service under this contract. We additionally offer the following benefits to the City as your geotechnical/materials testing firm of choice:
 Proximity and Local Presence. Your projects will be managed locally from our Stockton office with support from our corporate office and full-service laboratory in Pleasanton. We have more than 20 local staff who live and/or work in the Stockton and Brentwood area. Our inspectors are dispatched from their home or current project location.

Stockton Office: 343 E. Main St., Suite 711, Stockton, CA 95202 • 209.507.7555 (Office) • 209.507.7554 (Fax) Headquarters & Laboratory: 2118 Rheem Drive, Pleasanton, CA 94588 • 925.462.5151 (Office) • 925.462.5151 (Fax)  Experience, Certified, and Committed Team. Your assigned project executive, John Eudy, along with project engineers Tony Y. G. Lei, PE, GE, and Nicholous Barron will be dedicated to your projects.

Previous projects with the City of Brentwood have included the following:
o PMP 2024 Concrete – Material Testing o WWTP Trial Batch o Creekside Park Pickleball Updates Layout Details o WWTP Non-Potable Storage Facility o Pavement Management Program 2023 o Downtown Alley Rehab at Diablo Way  Unique Electronic Reporting System. CTS’ proprietary reporting software ELAS facilitates communication between our team and clients. Our project team can efficiently share results, reports, and budgets with clients as soon as they are created. Let our investment work for you! Scan this QR code to learn more.

The President of CTS, Patrick Greenan, PE, is authorized to negotiate and contractually bind the firm. Your primary contact for this contract is Greg Arellano, VP of Business Development. He can be reached at 650.380.8008 or via email at [email protected]. Thank you, we look forward to this opportunity! Sincerely,
Patrick Greenan, PE Greg Arellano John Eudy
President and Principal-in-Charge VP of Business Development Project Executive DRAFT

Page 385 of 872 ends

2. Subcontractors &
DRAFT
Conflict of Interest

Page 386 of 872 ends

2. SUBCONTRACTORS & CONFLICT OF INTEREST
Subcontractors
As a full-service firm with a staff of more than 200 personnel, including certified multi-disciplined special inspectors, certified technicians, and full-services laboratories, Construction Testing Services possesses the depth and breadth of resources to successfully complete all of the special inspections and materials testing services required in the scope of work for this contract (as outlined in the RFP Attachment A – Scope of Services).

Therefore, CTS does not foresee the need to team with subcontractors at this time.

If for any reason the City needs a specialized service that does not fall under the scope of services outlined in the RFP, CTS does have working relationships with other trusted local firms. We understand that approval of the City would be required and will obtain such permission if needed.

Conflict of Interest
CTS has no real or perceived conflicts of interest for this work and is fully prepared to enter into a contract if selected to perform on-call material testing services for the City of Brentwood.

DRAFT

Page 387 of 872 ends

DRAFT

3. Submittal Approach

Page 388 of 872 ends

3. SUBMITTAL APPROACH

1. Firm’s Qualifications
Brief History:

Founded in 1994, Construction Testing Services (CTS) has provided full service special inspection, material testing and engineering for nearly $30 billion in construction, ranging from civic centers and libraries to corporate office campuses, K-12 schools and universities to laboratories and hospital facilities, transportation and site work to water resource projects and hotels and parking structures to police and fire stations. CTS was founded to meet clients’ universal need for a responsive engineering and inspection consultant. The CTS team provides owners with thorough project management, monthly review of budgets and invoices and customized billing. With attention to detail, we help your projects to be completed on time and within budget.

Our experience includes:
• New construction and modernization of civic and commercial structures, hospital and laboratory facilities, housing, school, university, and public buildings.
• Installation of new energy efficient and sustainable systems such as solar photovoltaic panels, HVAC systems • Construction of up-to-date disabled access, elevators, and seismic upgrades • Site and street improvements
• Installation of new high and low voltage systems, including information technology Office Locations:

Headquarters & Laboratory:
2118 Rheem Drive, Pleasanton, CA 94588 ● 925.462.5151 office ● 925.462.5183 fax ● http://www.cts-1.com Local Office for this Project:
343 E. Main Street, Suite 711, Stockton, CA 95202 ● 209.507.7555 office ● 209.507.7554 fax CTS and its sister company Fenagh Engineering and Testing serve the California Bay Area, Sacramento, Silicon Valley, Southern California, San Diego Las Vegas, Seattle, New York, Boston, Miami, Austin and Ireland (2024).

Business Contact Information:

Please direct any questions and correspondence during the contracting process to Greg Arellano, VP of Business Development, who is authorized to speak for CTS during the evaluation process. During the project duration, your primary contact will be John Eudy, Project Executive. Their contact information is:

Greg Arellano, VP of Business Development
650.380.8008 (Cell) | 925.462.5151 (Office)
[email protected]
John Eudy, Project Executive
925.596.4151 (Cell) | 925.462.5151 (Office)
[email protected]
DRAFT

Page 389 of 872 ends

3. SUBMITTAL APPROACH
Staff Availability:

CTS will have no issues providing staff to complete the scope of services required. This table illustrates the current workload and availability of our proposed key team members. For individual experience with similar projects and specific roles please refer to the Project Team section and the resumes provided in the Appendix.

CTS Team Member/Role Assignments Availability
(Weekly)
John Eudy
Project Executive
Provide executive oversight and project management
on the projects related to this contract. 50%
Dan Ventura, PE
VP of Engineering
Oversee and conduct lab testing in CTS’ Pleasanton
laboratory and review reports. 30%
Tony Y.G. Lei, PE, GE
Geotechnical Engineer Provide geotechnical engineering as needed. 75% Nicholaus Barron
Staff Engineer
Provide engineering as needed and conduct lab testing
in CTS’ Pleasanton Laboratory. 30%
Ron Harr
Field Supervisor
Provide field supervision of CTS onsite inspection
teams. 30%
Darryl Spieker
Multi-Disciplined Special Inspector Provide specialized inspection services as required. 100% Peter Oum
Multi-Disciplined Special Inspector Provide specialized inspection services as required. 100% Rolando Bachicha
Multi-Disciplined Special Inspector Provide specialized inspection services as required. 100% Jesus Lopez
Multi-Disciplined Special Inspector Provide specialized inspection services as required. 100% Derrick Wofford
Multi-Disciplined Special Inspector Proved specialized inspection services as required. 100% We also have 120+ additional Multi-Disciplined Special Inspectors at our disposal to service the needs of this contract.

CTS has a staff of more than 200 employees including 100+ special inspectors who live and work in the Bay Area and are ready to be dispatched on the City’s projects. The following is CTS’ Personnel shown by type and position:

Principal-in-Charge – 1 Civil Engineers – 7 Field Supervisors – 3 Project Managers – 12 Geotechnical Engineers – 2 Senior Special Inspectors – 45 Administration – 29 Staff Engineers – 11 Special Inspectors – 72 Interns - 6 Laboratory Technicians – 15 Soils/Geotechnical Technicians – 51 DRAFT

Page 390 of 872 ends

3. SUBMITTAL APPROACH
Project Organizational Chart:

Subconsultants:

CTS is able to cover the entire scope of work covered in Attachment A of the RFP. We are not proposing the use of any subconsultants at this time. More information about our approach to subconsultants can be found in Section 2 – Subcontractors & Conflict of Interest.

Inspection Staff and Samples:

Material samples will be transported to CTS’ full-service, accredited laboratory and headquarters, located about 30 miles away in Pleasanton. The inspectors are dispatched from their home or current project location, allowing for quicker response times. CTS has inspectors living in Brentwood, Knightsen, Antioch, Pittsburg and Discovery Bay. For staff, actual time starts from the point at which the inspector arrives at the jobsite. CTS has minimum hourly charges of four hours for one-half day or less and eight (8) hours for over one-half day. These minimums are determined per our agreement with Operating Engineers Local 3. We are willing to negotiate upon award of the contract.

DRAFT

Page 391 of 872 ends

3. SUBMITTAL APPROACH

2. Project Team
The following is a list of our proposed project team with a brief project role overview. Details about each team member’s background and experience can be found in their resumes along with credentials, achievements, and project experience in Appendix A - Resumes.

CTS Team Member/Role Bio/Summary
John Eudy
Project Executive
Mr. Eudy will provide executive oversight over the contract with the City, the related projects, and their budgets. He will provide the City with a monthly budget analysis showing the actual inspection costs compared to the original estimate. He will also be the City’s point of contact, immediately connecting each project’s team with CTS’ resources.

Dan Ventura, PE
Engineering Manager
Dan oversees all material testing services in our Pleasanton laboratory as well as reviews inspection reports for conformance with the project’s plans and specifications and all applicable building codes (state and local) Tony Y.G. Lei, PE, GE
Geotechnical Engineer
Mr. Lei has over nine years of geotechnical consulting and construction testing and inspections experience. He will conduct geotechnical investigations, prepare geotechnical reports, and oversee any ongoing geotechnical testing and inspections as projects progress.

Nicholaus Barron
Staff Engineer
Mr. Barron specializes in soils classifying, soils earthwork and observations, and field testing by nuclear gauge. He is familiar with performing concrete and soils laboratory testing per the applicable ASTMs. He will review the technical aspects of field inspection reports and/or laboratory test results and assists in laboratory/field testing.

Ron Harr
Field Supervisor
Mr. Harr has more than 35 years of experience in the construction industry. As Senior Field Supervisor, Ron is responsible for quality control of our Field Supervisors and dispatching department and assures that all of our inspectors are properly trained and certified for the tasks assigned. Ron is also responsible for site visits and troubleshooting any onsite exceptions.

Daryl Spieker
Special Inspector
Mr. Spieker has over 30 years of experience in the construction industry with 17 of those years specializing in special inspections. Daryl specializes in concrete, shotcrete, and epoxy dowel and bolt proof load testing.

Rolando Bachicha
Special Inspector
Mr. Bachicha has more than 43 years of experience in the construction industry with 19 of those years in materials testing. Mr. Bachicha specializes in soils observation and compaction testing.

Jesus Lopez
Special Inspector
Mr. Lopez has been in the construction industry for over 31 years with 6 years specializing in special inspections. His specialty is providing special inspections for structural welding, and non-destructive testing. Mr. Lopez has a strong engineering background in steel pipe fabrication, being a project engineer for 11 years.

Derrick Wofford
Special Inspector
Mr. Wofford has been in the construction inspections industry for approximately 2 years. He specializes in concrete inspections and nuclear gauge soils testing.

Peter Oum
Special Inspector
Mr. Oum specializes in soils compaction testing and concrete sampling. He holds a Grade 1 ACI Concrete Field Testing Technician Certification as well as ACI Concrete Strength Testing and Nuclear Gauge certifications.

DRAFT

Page 392 of 872 ends

3. SUBMITTAL APPROACH

3. Project Experience
Client / Contract City of South San Francisco / On-Call Architectural, Engineering & Other Professional Services: Geotechnical Engineering and Materials Testing Project Name Orange Memorial Park Aquatic Center / 20431 Completion Schedule Ongoing, Anticipated completion in 2025 Description As the original Orange Pool has exceeded the typical lifespan for indoor aquatic centers, the City of South San Francisco has begun construction of a new aquatic center adjacent to the original facility. Once the new facility is completed, the old facility will be demolished. The new facility will include a 24,000 sqft single-story facility, 2 pools including a 25-yard lap pool and a separate warm water teaching and recreation pool, swimmers lounge and locker rooms, and rentable multi-use rooms.

CTS provides geotechnical engineering support and materials testing for this project.

Reference Jeffrey Chou, 650.829.6668, [email protected] Project Specific Contact: [email protected]
Project Budget $49 Million
CTS Team Jonathan Felts, Project Executive; Kevin Sweeney, Project Manager; Dan Ventura, PE, Engineering Manager; Tony Y. G. Lei, PE, GE, Geotechnical Engineer; Anna Nguyen, Staff Engineer; Edwin McMillan, Special Inspector; Jordon Sandbloom, Special Inspector; Mark Eres, Special Inspector; Freddy Angulo, Special Inspector; Sarah Garay, Special Inspector; Cesar Lujan, Special Inspector; Austin Bonds, Special Inspector; Kevin Haddad, Special Inspector; Steven Greer, Steel Shop Inspector; Client / Contract City of Brentwood / On-Call for Geotechnical Construction Materials Testing Services for Infrastructure Projects
Project Name City of Brentwood PMP 2024 – Concrete, CIP Project No. 336-31703 / 20702 Completion Schedule Completed November 2024
Description As part of our On-Call contract with the City of Brentwood, CTS provided field inspections and materials testing for this project including nuclear gauge compaction testing, concrete compressive strength testing, field concrete testing, moisture density relations of soils, and engineering support for these tests. The project consisted of:
upgrading curb ramps to be ADA compliant; removing and replacing existing sidewalk, driveway approaches, and curb and gutters; removing trees; adjusting utilities to grade; and constructing a new sidewalk along the south side of Spruce Street near Liberty High School.

Reference Brant Wilson, PE, Associate Civil Engineer, 925.306.5192, [email protected]
Project Budget $434,826.50
CTS Team John Eudy, Project Executive; Steven Gonsalves, Project Manager; Dan Ventura, PE, Engineering Manager; William Prince, Staff Engineer; Ron Harr, Field Supervisor; Mohsen Noshad, Special Inspector; Darryl Jaime Jr., Special Inspector; DRAFT

Page 393 of 872 ends

3. SUBMITTAL APPROACH
Client / Contract City of Galt / On-Call Engineering & Material Testing Services Project Name Gora Aquatic Center Waterslide / 20641
Completion Schedule CTS’ Geotechnical Investigation completed June 2024 Project construction is ongoing
Description CTS has held an on-call contract with the City of Galt as far back as 2014. In June of 2024 CTS provided a Foundation Investigation Report for the waterslide project. The project involved demolition and replacement of the existing waterslide. The new slide is expected to be about 30 ft tall.

Reference Betsy Flores, 209.366.7295, [email protected] Project Budget $1.4 Million
CTS Team John Eudy, Project Executive; Dan Ventura, PE, Engineering Manager; Tony Lei, PE, GE, Geotechnical Engineer; Cassidy Bertsch, PE, Associate Engineer Client / Contract City of Livermore / On-Call Geotechnical Engineering Project Name City Hall HVAC & Central Plant Chiller Replacement Project / 19904 Completion Schedule Completed November 2024
Description This project was completed as part of CTS’ on-call contract with the City of Livermore. We have held many on-call contracts with the City of Livermore since as early as 2001. This project involved the replacement of the HVAC control systems for the City Hall, Library, and Police Department buildings, installation of carbon dioxide sensors at various locations, and replacement of current boilers and chillers. CTS performed field and shop steel/welding inspections, materials testing, and geotechnical inspections.

References Mike Stamm, Construction Manager, 925.960.4543, [email protected] Joe Kuderca, 925.960.4536 x5175, [email protected] Project Budget $4,635,551
CTS Team John Eudy, Project Executive; David White, Project Manager; Dan Ventura, PE, Engineering Manager; Tony Y. G. Lei, PE, GE, Geotechnical Engineer; Gavin Lynch, Staff Engineer; Ron Harr, Field Supervisor; Lawrence DeForge, Special Inspector; Andrew Keech, Special Inspector; Michael Canyon, Special Inspector; Client / Contract City of San Jose / San Jose/Santa Clara Regional Wastewater Facility CIP OnCall Project Name Advanced Facility Control and Meter Replacement Phase 1 / 17375 Phase 2 / 17628 Completion Schedule Phase 1 completed July 2022, Phase 2 completed June 2023 Description This capi9tal improvement project to replace outdated wastewater facility equipment is funded by Measure T bond proceeds and other State and Federal funding sources.

CTS provided a variety of testing and inspection services including reinforcing Steel and Concrete, Structural Steel, and other miscellaneous field, laboratory, and geotechnical support.

Reference Helen Choi, Norman Mascarinas, 408.635.4006
Project Budget Phase 1: $12.5 Million, Phase 2: $15.1 Million CTS Team John Eudy, Project Executive; Dan Ventura, PE, Engineering Manager; Emmanuel Valencia, Staff Engineer; Ron Harr, Field Supervisor; Anthony Peralta, Special Inspector; Mayann Paet, Special Inspector; Moises Ramirez, Special Inspector; Natalie Saylor, Special Inspector; William Whalen, Special Inspector; DRAFT

Page 394 of 872 ends

3. SUBMITTAL APPROACH
In addition to the above projects, CTS has contracted similar scopes of service for the following clients:
• City of San Jose • City of Berkeley • Contra Costa County and Water District • City of Fremont • City of Richmond • Department of General Services • City of San Leandro • City of Antioch • City of Santa Clara and Water District • City of Pittsburg • City of Brentwood • City and County of San Francisco • Oro Loma Sanitary District • City of Newark • Zone 7 and Diablo Sanitation District • City of Hayward • City and County of Alameda • City of Napa Additional Relevant On-Call and Public Works Experience:
• San Leandro Unified School District Master On-Call, Soils Investigation, Geotechnical, and Geohazard Engineering Design Services
• City of Concord, Master On-Call – Geotechnical Services • City of Nappa, Master On-Call Geotechnical Services
• City of Roseville, Master On-Call Geotechnical Engineering • Placer County Water Agency Master On-Call Geotechnical Consulting and Material Testing Services • City of Livermore Master On-Call Geotechnical Engineering and Material Testing Consulting Services • City of Brentwood, On-Call for Geotechnical Construction Materials Testing Services for Infrastructure Projects
• Sierra Joint Community College District Master On-Call, Geotechnical and Special Inspection Testing Consulting Services for the Rocklin Campus
• City of Pittsburg, On-Call for Environmental, Hazardous, & Geotechnical Services • City of San Carlos On-Call Geotechnical and Special Inspections • City of Alameda On-Call Geotechnical & Quality Assurance Services • County of San Mateo On-Call Geotechnical Engineering for Park Projects DRAFT

Page 395 of 872 ends

3. SUBMITTAL APPROACH

4. Project Approach
Approach to On-Call Contracts:

We understand that accurate and timely reporting is important to our clients. Our approach is to provide a team that can promptly address the required needs of any given project. CTS’ staff includes several registered engineers, efficient dispatch, detailed accounting, and technical support for our 200+ field inspectors/technicians, making them readily available to be on this job site when needed. What sets CTS apart from other testing laboratories is the coordination of our team both in the field and in our office. This coordination is aided by CTS’ proprietary, state-of-the-art reporting and project management system ELAS. More information on ELAS can be found under the Quality of Work section of this Submittal Approach.

Upon the contract award and the issuance of the first Task Order, CTS will initiate a Pre-Construction Meeting with project stakeholders. This meeting serves as a platform to forge strong relationships between CTS and the entire project team and there the project’s goals, scope, and schedule, are determined. By clarifying roles and expectations upfront, information that CTS needs to plan its services effectively is pulled into the conversation and considered. The groundwork is thus laid for a streamlined and effective investigation and inspection process; and the agility and efficiency of the entire project team is enhanced.

CTS acknowledges that project schedules evolve. The rapport established through the pre-construction meeting and regularly scheduled check-ins will facilitate the seamless dissemination of schedule changes and allow CTS to accommodate adjustments swiftly and effectively which in turn will minimize disruptions and maintain project momentum.

Methodology of Service:

Daily Field Reports: Our inspectors digitally submit daily field reports using ELAS and can send digital copies (PDF) to any interested party as required. This report is reviewed by the CTS Engineering Team on the same day.

Weekly Summary Reports: Our reporting software ELAS compiles all lab test results and field/shop inspections performed during the week and generates a summary of all work done. These are reviewed by the Operations and Engineering teams before being finalized and distributed the following week to the owner, general contractor, architect, and structural engineer via e-mail (or uploaded into your reporting system) or as requested by the client.

Immediate Response: Any outstanding issues are punch-listed and reported immediately to the client for resolution. Our inspectors are equipped with the tools needed to accomplish the desired test or inspection.

Samples are picked up and transported in accordance with applicable ASTM standards to our local laboratory for further analysis and testing.

Laboratory Results: CTS can turn around reports and laboratory results in 24 to 48 hours, depending on when the sample is received by our laboratory. CTS runs a double shift, meaning there is someone available to run your lab test 15 hours per day. Typed laboratory testing reports are distributed the following week from the day the laboratory test was performed. Sub-standard results are immediately communicated to the proper team members, as well as the owner. Real-time lab results are also posted online using ELAS.

Dispatch: Our inspectors are available with a minimum of 24 hours’ notice. The project manager and/or superintendent may contact our dispatcher to schedule inspections and/or sample pick-ups. Upon receipt of an inspection request, our qualified inspectors will perform the inspection(s) as per approved standards accordingly.

Budget Tracking: Our budget analyses are provided monthly using ELAS. Your project manager will analyze invoices against summary reports so that they and you will always know where your project stands. As the project progresses there might be some changes or additions to the budget which will be listed in the lower “additional services” section of the budget analysis.

DRAFT

Page 396 of 872 ends

3. SUBMITTAL APPROACH
Catering to our Clients: In our thirty years of business CTS has contributed to numerous municipal projects. We understand their requirements but are aware that each project and client is unique. CTS is eager to tailor our services to our clients’ needs. We can adjust reporting (VCR’s) in response to IOR requests, we can fine tune invoices to accommodate our client’s protocols, and we can budget or forecast as requested.

Scope of Work:

For this contract our services will provide the City with geotechnical analysis services as needed including site investigations including subsurface exploration, soils laboratory tests, engineering analysis, and detailed site and project specific geotechnical reports. We will also provide construction observation and verification that geotechnical recommendations are appropriate for the site conditions, all under the supervision of an experienced, California-registered geotechnical engineer.

CTS is able to provide a full range of materials testing, special inspection, and engineering services. See Appendix C - Attachment C, Page 3 for a more complete understanding of CTS’ offered services. Additionally, a full list of the materials engineering and testing services we provide can be found on our website – www.cts-1.com. In addition, we offer the following specific services relevant to the needs of this RFP:
• Concrete Field Work, Observations, Inspections, and Laboratory Testing • Soil Compaction Testing and Materials Analysis
• Aggregate Testing including Compaction Testing
• Asphaltic Concrete Laboratory Testing, Existing Pavement Analysis, and Various Field Inspections Such as Placement and Batch Plant
• Slurry Seal Laboratory Testing and Placement Inspections DRAFT

Page 397 of 872 ends

3. SUBMITTAL APPROACH
The following table demonstrates some of the key deliverables and their expected turnaround times for this contract:

SCOPE OF WORK DELIVERABLES EXPECTED TIME OF COMPLETION
Field Exploration Activities
Review published documents, such as
geotechnical/geological data from asbuilts, preliminary design plans or maps.

As new documents are created or as
required for the project.

Laboratory Testing
Laboratory testing is performed in our
certified geotechnical laboratories inhouse so the schedule is controlled Per test method and included in the
geotechnical report
Geotechnical Report Preparation
Analyze the field and laboratory data
in accordance with the generally
accepted geotechnical engineering
practice and guidelines.

Per project requirements. Depending
on project complexities, deliverable
of reports is usually 3 to 4 weeks
following completion of the field
exploration, 4 to 8 weeks from notice
to proceed
Reviewing/certifying reports in a
timely manner (30 days) Engineer’s review
As reports are completed, prior to
disseminating to project team
(weekly reports)
Preparation, coordination, or review
on test reports Engineer’s review
Test reports are completed as results
are reported. All tests are completed
per code requirements.

Provide and distribute weekly reports
of all inspection activity upon request
PDF report is emailed to client team
and posted to web
Sent week after inspections occur,
summarizing activities and providing
lab test results
Coordination and scheduling of oncall inspection services with the contractor and the project manager
Field supervision and dispatch
Inspections can be provided within
24 to 48 of being requested. CTS can
also fulfill requests at a moment’s
notice when required
Preparation of Final Affidavit/Final
Report Final Affidavit End of project/as requested by client (one week to prepare) Geotechnical Observation, GEOR
during construction
Provide clarification and information
about the PS&E and/or geotechnical
report, review, and comment on
contract change orders, and
periodically visit the site to observe
the construction and verify general
compliance with the contract
documents.

As changes are made or as required
for the project.

Coordinating work plans and field
activities following protocols of
oversight agencies
Project management and QA Per project specifications/as requested by client
Meeting attendance with City staff Project management Monthly/as requested by client DRAFT

Page 398 of 872 ends

3. SUBMITTAL APPROACH

5. Quality of Work
Electronic Reporting System – ELAS:

CTS has created a cloud-based application and companion app called ELAS that optimizes the reporting process.

ELAS as a tool facilitates transparency with CTS activities, enabling Clients to view inspector activity, reports, and preliminary estimates. In addition to test-result reporting capabilities, ELAS has tools for project managers to immediately generate budgets based on initial estimates and work performed. Full-color reports with pictures and plan markups are available in real-time for review by our engineers and, ultimately, distribution to project shareholders. Our team uploads inspection and laboratory reports daily, and ELAS allows these reports to be immediately emailed to the project team at the click of a button.

In addition, ELAS tracks exceptions and non-compliance incidents from initiation to closure.

ELAS brings efficiencies to every sector of CTS, improves the Client relationship, and keeps joint projects on track. Let our investment work for you! Scan this QR code to learn more.

Testing/Deliverables Turnaround Times:

In addition to the DFR’s which are submitted immediately by the inspector, the City can also expect to receive weekly summary reports. These reports will include the findings from field inspections, as well as a compilation of any test results which were reported that week. CTS additionally provides monthly budget analysis. The following list shows some of the relevant turnaround times for the various deliverables relevant to this project:
• Field Inspections: Inspector on site within 24-48 hours of the request • Daily Field Reports: Left onsite and additionally sent to project stakeholders via ELAS • Weekly Reports: Sent the week after inspections and include inspections, field work, and laboratory results
• Laboratory Tests: Most laboratory test results can be turned around in 24 to 48 hours • Mix Design Reviews: Within one week of submittal
• Concrete Breaks: Per code, 3, 7, 14, & 28 days, results delivered immediately via ELAS • Itemized Invoice and Budget Analysis: Monthly
• Final Affidavit: End of project/as requested by the City DRAFT

Page 399 of 872 ends

3. SUBMITTAL APPROACH
Drawings and Reports
The following is a selection of sample drawings and logs from a geotechnical report prepared by CTS.

Table of Contents
The following is a sample table of contents from a report prepared by CTS.

DRAFT

Page 400 of 872 ends

DRAFT
Appendix A: Resumes

Page 401 of 872 ends

APPENDIX A: RESUMES
John Eudy, Project Executive
Hired in 2013, Mr. Eudy has over two decades of experience in the construction industry serving as quality control manager, project manager and superintendent.

He provides executive oversight over contracts and budgets. He will provide his clients with a monthly budget analysis showing the actual inspection costs compared to the original estimate and will meet with his clients’ project representatives regularly (at least once per month) to review progress, ensure proper allocation of resources and general satisfaction with CTS’ services. He is a key participant in project kick-off meetings.

Education: Project Management Career Advancement Program, University of the Pacific BS, Business Administration, California State University Chico Certifications: U.S. Army Corps of Engineers, Construction Quality Management for Contractors OSHA Competent Person Trained in Trenching and Excavation Standards Construction NPDES Permit No. 2009-0009, Qualified SWPPP Practitioner CPR and First Aid Certified
On-Call Contracts
City of Alameda, Geotechnical Engineering and Construction Testing Services (July 2020 – Present) Harbor Bay Parkway Signal Installation (2020)
Group 4 Sewer Pump Station Renovations (2020)
Cyclic Sewer Replacement Phase 17 (2020)
City of Brentwood, On-Call Engineering and Materials Testing Services (May 2022 – Present) Pavement Management Program for Concrete (2023). Located at various sites throughout the City, the project involves the removal and replacement of existing sidewalks, handicap ramps, curbs and gutters.

Downtown Alley Rehab at Diablo Way (2021). This project includes the installation of new water, sewer and storm drain facilities and the removal or replacement of existing infrastructure.

Brentwood Wastewater Treatment Non-Potable Storage Facility (2018). CTS conducted soil and asphalt testing.

City of Livermore, Master On-Call Geotechnical Engineering (May 2023 – Present) Slurry Seal Project (2023). This project consisted of street preparation: tree and root trimming, pavement repairs, installation of ADA ramp truncated domes, crack sealing, removal of traffic striping and markers, application of micro-surfacing and slurry seal treatments, adjustment to grade of utility boxes, the installation of thermoplastic pavement markings and raised pavement makers and various site improvements. CTS performed special inspections, materials testing, and geotechnical inspections.

City Hall HVAC & Central Plant Chiller Replacement Project (2023). This project involved the replacement and upgrades to various components of the City Hall, Central Plant, and Police Department’s HVAC systems. CTS performed special inspections, materials testing, and geotechnical inspections.

City of Oakland, Master On-Call for Special Inspections and Materials Testing (2013 - Present) 2018 Preventative Maintenance Resurfacing Project; Fire Stations #10, #12, #16 Dorm Renovation Projects; Fire Stations #8 & #13 Driveway Projects; Golden Gate Recreation Center and the 2020 Citywide Paving and Concrete Project.

Affordable Housing
Rosefield Village Apartments Rehabilitation and New Buildings, Alameda, CA, Alameda Housing Authority, Sunnydale HOPE SF Block 3A and Block 3B, San Francisco, CA, Related/Sunnydale Housing Partners, LP DRAFT

Page 402 of 872 ends

APPENDIX A: RESUMES
Dan Ventura, PE, Supervising Engineer
Responsibilities: Mr. Ventura is CTS’s VP of Engineering, overseeing all engineering operations. He has a wealth of UC, public school, and public agency experience gained from nearly two decades in the industry. Dan will serve as Supervising Engineer and ensure inspection and laboratory reports are reviewed for conformance with construction documents and applicable codes.

He will oversee all materials testing services in our laboratories and confirm work is performed per CTS’ in-house QC procedures and ASTM standards.

Education: BS, Civil Engineering, Geotechnical Engineering Emphasis, from California Polytechnical State University, San Luis Obispo, CA Registrations: Professional Engineer, State of California, No. C81280 Certifications: Caltrans 105, 106, 223
ACI Concrete Field Testing Technician Grade 1, No. 1136309 Nuclear Gauge
Fyfe Co. LLC FRP Course
FACE F-Number Measurement
Years with CTS: 16 (hired in 2008)
Related Projects:

Public Works
City of Berkeley, Berkeley, CA On-Call Geotechnical and Engineering Testing Services; Contra Costa Water District, Concord, CA; On-Call Materials Testing Services; Contra Costa County Public Works, Martinez, CA; On-Call Materials Testing and Inspection Services City and County of San Francisco, CA; On-Call Materials Testing and Special Inspection Services, City and County of San Francisco, ESER 1 Bond Program – Fire Stations Component, San Francisco, CA; Central Contra Costa Sanitary District, CA On Call Materials Testing and Inspection Services; City of Oakland – Citywide Capital Improvement, Oakland, CA; On-Call Construction Material Testing and Inspection Services
Hospitals
Dignity Health, Sequoia Hospital Pavilion Bed Tower, Redwood City, CA; Sutter Health/Alta Bates Summit Medical Center Patient Care Pavilion and Parking Structure, Oakland, CA; Laguna Honda Hospital, Replacement Facility and Rehab Center, San Francisco, CA; Sutter Eden Medical Center, Castro Valley, CA; Catholic Healthcare West, Sequoia Hospital – CUP, New Pavilion and Parking Structure, Redwood City, CA; Kaiser Oakland Medical Center – Structural Concrete, Oakland, CA; Housing
4200 Geary Senior Housing, San Francisco, CA; 420 Mendocino Avenue, Santa Rosa, CA; Alvarado Gardens Apartments, San Pablo, CA; Silvery Towers, San Jose;
K-14 & Universities
UC Berkeley, DM Centennial Bridge Improvements Project 12703A, Berkeley, CA; UC Berkeley, Valley Life Science Building Catwalk, Berkeley, CA; UC Berkeley Wurster Hall Seismic Corrections (Berkeley CA); UC Berkeley, Jean Gray Hargrove Music Library, Berkeley, CA; UC Berkeley MSRI Auditorium Addition, Berkeley, CA; UC San Francisco Mission Bay 23B Parking Structure, San Francisco, CA; UC Santa Cruz Physical Science Building, Santa Cruz, CA; UC Santa Cruz Biomedical Sciences Facility, Santa Cruz, CA DRAFT

Page 403 of 872 ends

APPENDIX A: RESUMES
Tony Y.G. Lei, PE, GE, Geotechnical Engineer
Responsibilities: Mr. Lei has over nine years of geotechnical consulting and construction testing and inspections experience. He has been a lead geotechnical investigator and consultant on over 1,000 projects varying from low-rise commercial and industrial buildings, medical clinics, office and mixeduse buildings, hotels, low- to mid-rise residential buildings including apartment complexes, subdivisions and low-income housing, schools, hospitals, storage tanks, tank farms, pump stations, carports, canopies, billboard signs, bridges, airports, roadways, flood control and levee embankments.

Education: BS, Civil Engineering, University of California, Davis, 2015 Registrations:
o California Professional Engineer, Civil 89262 o Florida Professional Engineer, Civil 98174 o California Geotechnical Engineer, GE 3223 o Massachusetts Professional Engineer, Civil 58861 o Arizona Professional Engineer, Civil 80390 o Texas Professional Engineer, Civil 151325 o Nevada Professional Engineer, Civil 32046 o Washington Professional Engineer, Civil 24002406 Affiliations:
o American Society of Civil Engineers o Cal-Geo
o Geo-Institute o Deep Foundations Institute
Certifications:
o MLE o Nuclear Gauge (B7EMMM5CHE5C76G_84508)
o SME o HAZMAT (39679-167-199-2862)
o QSD/P C89262 o OHSA 10-Hour (36-005758497)
o RSO (50816-167-201-2022) o USDOT FAA sUAS 4771443
Related Projects:

Public Works
Contra Costa West County, West Reentry, Treatment and Housing/Richmond: Geotechnical Consulting-Plan review, chemical treatment recommendations, retaining wall surcharge recommendations.

Gora Aquatic Center, City of Galt: Geotechnical Investigator for a new waterslide.

City of Palo Alto: Third party reviewer for dewatering reports and plans Bridges
Bridge House Lake, Rancho Murietta, CA: Geotechnical Investigator for bridge over private lake.

Woodbridge Road Subdivision Bridge, Lodi, CA: Geotechnical Investigator for bridge over Woodbridge Irrigation District canal.

Casino Mine Ranch Winery, Plymouth, CA: Geotechnical Investigator for wine making and tasting facilities including bridge and earthen dam evaluation.

Pipelines
Yolo Cold Storage Utility Crossing, Woodland, CA: Exploratory Drilling and Geotechnical Consulting for utility crossing beneath Interstate 5.

Avenue 21 Pipeline, Madera County, CA: Exploratory Drilling and Geotechnical Consulting for gas pipeline crossing beneath Eastside Bypass
DRAFT

Page 404 of 872 ends

APPENDIX A: RESUMES
Nicholaus Barron, Staff Engineer
Mr. Barron specializes in soils classifying, soils earthwork and observations and field testing by nuclear gauge.

He performs concrete and soils laboratory testing per the applicable ASTMs. He reviews field inspection reports and laboratory test results, and assists in laboratory/field testing.

Education: BS, Civil Engineering, San José State University Certifications: Nuclear Gauge Operator
OSHA 10 Hour Construction Safety and Health
Years with CTS: 2 (2021)
Related Experience:

Project / Job# California High Speed Rail CP4 / 14282
Institution California Rail Builders, LLC,
Contact Info Carlos Solis, 400 N F Street, Wasco, CA 93280 Service Mr. Barron was a staff engineer on construction package 4 on the California High-Speed Rail Project. The project’s northern terminus is approximately one mile north of the Tulare-Kern County Line and extends 22 miles in length to the southern terminus at Poplar Avenue, just north of the city of Shafter. The Project consists of at-grade, retained fill, and aerial rail sections.

Relocating and re-purposing existing BNSF tracks, reconstructing selected roadways, and creating waterway and wildlife crossings, CP-4 consists of 14 structures: overpasses, underpasses, and viaducts, including a +2,000 ft long pergola south of the city of Wasco. CTS provided a quality control plan for this project and performed quality material sampling and testing for acceptance of materials or products incorporated in the project as needed.

Contract September 2017 – July 2023
Project / Job# City of Oakland City Wide Speed Bump Program/ 18931 Institution City of Oakland
Contact Info Joseph Tanios, 510.615.5537, [email protected] Service CTS has held an on-call service agreement with the City of Oakland (current contract March 2022) for capital improvement projects including bridges, retaining walls, structures, recreation centers, libraries, public safety buildings, administration buildings, roadways, paving, sidewalks, traffic signals, and underground pipelines. Mr. Barron serves as the staff engineer for the speed bump program.

Contract August 2022 – present
Project / Job# 580 Dubuque, South City Station. South San Francisco, CA / 18351 Institution IQHQ
Contact Info Cole Range, 209.712.7486, [email protected] Service The South City Station 580 Dubuque project involves the rehabilitation of a former Caltrain storage depot and creation of a dynamic, urban innovation science and technology center. With 355,000 sqft the property will have the capacity for 842 employees on site. The project is aiming to receive LEED Gold Certification. Mr. Barron is a staff engineer on this project.

Contract March 2022 - present
Project / Job# Santa Clara School Access Improvements / 18711 Institution City of Santa Clara
Contact Info Faranak Mahdavi, 408-615-3061, [email protected] Service CTS is providing onsite testing and inspections and laboratory testing and engineering.

Contract May 2022 - present
DRAFT

Page 405 of 872 ends

APPENDIX A: RESUMES
Ron Harr, Field Supervisor
Responsibilities: As Senior Field Supervisor, Ron is responsible for quality control of our field staff and dispatching department and warrants that all our inspectors are properly trained and certified for the tasks assigned. Ron is also responsible for site visits and troubleshooting any onsite exceptions.

Mr. Harr has more than 35 years of experience in the construction industry with a specialty in materials testing and inspection. Ron experience includes performing resident inspector duties on major construction projects in the Northern California Region. His responsibilities include field observations of reinforcing steel, concrete placement, masonry, structural steel, shear wall nailing and fireproofing as well as DSA masonry and shotcrete inspections. As Senior Field Supervisor, Ron is responsible for quality control of our Field Supervisors and dispatching department and assures that all of our inspectors are properly trained and certified for the tasks assigned. Ron is also responsible for site visits and troubleshooting any onsite exceptions. In his role at CTS, Ron has provided field supervision, dispatch, inspections relief and project estimating services.

Certifications: ICC Structural Steel and Welding, No. 1010831-85 ICC Reinforced Concrete, No. 1010831-88
ICC Structural Masonry, No. 1010831-84
ICC Prestressed Concrete, No. 1010831-89
ACI Concrete Field-Testing Technician – Grade I
DSA Shotcrete, No. 4769
DSA Masonry, No. 5055
OSHA 30
Fyefe CO. LLC FRP Course
ACI Masonry Field Testing Technician, No. 138893
Languages: Native English speaker
References:

Royce Taylor, IOR, 510.377.6240 (Sequoia Hospital CUP and Pavilion, Redwood City) David Montenegro, City of San Jose, 408.945.5177 (Mineta International Airport - Terminal B, San Jose) Related Projects:

Transportation
Mineta San Jose International Airport, Terminal A, B, and ConRAC Rental Car Facility, San Jose, California SFO Terminal 1 Air Train Bridge and Mezzanine, San Francisco, CA Oakland International Airport Apron Extension Project
McCarran International Airport Terminal 3, Las Vegas, Nevada Universities
University of California, Berkeley, Jean Gray Hargrove Music Library, Berkeley, CA University of California, Merced, New Campus, Merced, CA UC Merced Downtown Center Campus, Merced, CA
San Jose State University Campus Village, San Jose, CA
University of California, Biomedical Sciences Facility, Santa Cruz, CA City College of San Francisco, Joint-Use Facility, San Francisco, CA.

Data Centers and Research and Development Campuses
Digital Realty, 800 Central Expressway - Powered Base Building, Santa Clara, CA Hewlett Packard (HP) B20 Annex, Palo Alto, CA
DRAFT

Page 406 of 872 ends

APPENDIX A: RESUMES
Inspector Credentials
Name: Daryl Spieker
Role: Multi-disciplined Special Inspector
Start Date at CTS March 2007
Summary Mr. Spieker has over 30 years of experience in the construction industry with 17 of those years specializing in special inspections. Daryl’s specialties are in concrete, shotcrete, and epoxy dowel and bolt proof load testing. Daryl’s responsibilities include performing tests and inspections for compliance with the project plans and specifications and the applicable building codes.

Certifications Wilrick Institute of Technology
ACI Concrete Field Testing Technician – Grade 1, No. 01082338 ICC Reinforced Concrete Special Inspector, No. 5294771
ICC Prestressed Concrete Special Inspector, No. 5294771 Nuclear Gauge Operator Training, No. 15683
Name: Rolando Bachicha
Role: Multi-disciplined Special Inspector
Start Date at CTS July 2018
Summary Rolando has more than 43 years of experience in the construction industry with 19 of those years in materials testing. Mr. Bachicha specializes in soils observation and compaction testing.

Certifications Rizal Technological University, B.S Civil Engineering Caltrans CT 125 AGG/ HMA, 231, and 375
Nuclear Gauge Safety Training, No. 44273
Name: Jesus Lopez
Role: Multi-disciplined Special Inspector
Start Date at CTS February 2021
Summary Mr. Lopez has been in the construction industry for over 31 years with 6 years specializing in special inspections. His specialty is providing special inspections for structural welding, and non-destructive testing. Mr. Lopez has a strong engineering background on steel pipe fabrication bring a project engineer for 11 years.

Certifications Bachelor of Science in Civil Engineering, Universidad Autonoma de Baja California, 1989
AWS Certified Welding Inspector, No. 17120991
DRAFT

Page 407 of 872 ends

APPENDIX A: RESUMES
Name: Derrick Wofford
Role: Multi-disciplined Special Inspector
Start Date at CTS February 2025
Summary Mr. Wofford has been in the construction inspections industry for approximately 2 years.

He specializes in concrete inspecitons and nuclear gauge soils tesing.

Certifications ACI Concrete Field Testing Technician – Grade 1, No. 2205905 ICC Spray Applied Fire Proofing, No. 10323057
Nuclear Gauge Operator Training, No. 19060
OSHA 30-Hour Construction Safety and Health
Name: Peter Oum
Role: Multi-disciplined Special Inspector
Start Date at CTS July 2024
Summary Mr. Oum specializes in soils compaction testing and concrete sampling.

Certifications ACI Concrete Field Testing Technician – Grade 1, No. 02105210P ACI Concrete Strength Testing Technician, No. 02105210
Nuclear Gauge Operator Training, No. 63483-171-926-1542 DRAFT

Page 408 of 872 ends

DRAFT
Appendix B: Rate Schedule

Page 409 of 872 ends

Standard Discounted
* FIELD INSPECTION AND LABORATORY SERVICE Rate/Hour Rate/Hour Steel Visual $250.00 $150.00
Nondestructive - VT, UT, MT, PT $255.00 $150.00
Steel Visual/UT Combination $255.00 $150.00
Steel Shop Inspections – Outside Northern California $250.00 $150.00 Concrete ACI $250.00 $150.00
Concrete ICC $250.00 $150.00
Masonry $250.00 $150.00
Fireproofing $250.00 $150.00
Firestopping (ICC/IFC) $250.00 $150.00
Shear Wall Nailing/Framing/Hold Downs $250.00 $150.00
Soils/Earthwork Technician w/Nuclear Gauge and/or Sand Cone (portal-to-portal) $250.00 $175.00 Hot Mix Asphalt Technician (portal-to-portal) $250.00
Shoring/Soldier Piers $250.00
Roofing & Waterproofing $250.00
NACE Coating Inspection - Level II $300.00
NACE Coating Inspection - Level III $360.00
Med-Gas 6020 $250.00
Multi-Disciplined Inspector $250.00
Inspector Requiring G1 Pay Grade $300.00
Specialty Inspector or Where Formal Certification is Required $250.00 Field Inspector with Special Enhancement $250.00
DSA Masonry Inspector $255.00
Safety Manager/Safety Inspector/Jobsite Safety Accountability Supervisor (JSAS) $520.00 Laboratory Technician $250.00
Additional Sample Preparation Time $250.00
Technician Typist $250.00
**PROFESSIONAL ENGINEERING SERVICES
Principal Engineer (Civil/Structural) $385.00 $345.00
Geotechnical Engineer $340.00 $300.00
Professional Geologist $325.00 $275.00
Consulting Engineer (Civil/Structural) $320.00 $290.00
Associate Engineer, Licensed $280.00 $250.00
Project Manager/Project Executive $250.00 $195.00
Staff Engineer $250.00 $195.00
Field Supervision $250.00 $195.00
ASNT Level III $300.00 $265.00
Drafting $185.00
Quality Control Manager $275.00 $225.00

SPECIAL SERVICES
Portable and Mobile Laboratories, NDT and Soils, Concrete, Asphalt QOR * Epoxy Bolt/Expansion Anchor - Installation Observation $250.00 $150.00 * Epoxy Bolt/Expansion Anchor Proof Load Testing (portal-to-portal) $250.00 $150.00 * Coring, 1 Person (including equipment) (portal-to-portal) $325.00 $225.00 * Coring, 2 Persons (including equipment) (portal-to-portal) $480.00 $285.00 * Asphalt Coring (portal-to-portal) $350.00
Steel - Dye Penetrant Testing $255.00
Project Research QOR
Ultrasonic Testing for Non-Metallic Materials QOR
Pavement Rehabilitation Analysis Using Deflections QOR
Roof Moisture Survey QOR
Soil Drilling Equipment QOR
Geotechnical Site Investigations/Foundation Reports QOR Estimating Concrete Strength by the Maturity Method - Equipment Fee $125/kit ASTM C1074 QOR CSL/Crosshole Sonic Logging QOR
Vector Mapping QOR
Roof Uplift Testing QOR
Inclinometer Testing QOR
Vibration Moniroring/Accelerometer QOR
Tilt Monitoring QOR
External Windows And Doors Dynamic Water Penetration Testing AAMA 501.1 QOR Curtain Wall Testing AAMA 501.2 QOR
Ground Penetrating Radar QOR
DCP - Dynamic Cone Penetrometer QOR
Gamma-Gamma Logging of CIDH Piles (Daily Rate) CT233 $3,610.00 FGIA/AAMA Window and Skylight Testing (Daily Rate) ASTM E1105, AAMA 501.2, 502 503 $3,610.00 Pachometer, Schmidt Hammer, Windsor Probe, Skidmore - Equipment Fee $115/Day (portal-to-portal) $360.00 Ultrasonic Pulse Velocity Testing - Equipment Fee $250/Day (portal-to-portal) ASTM C597 $710.00 Impact Echo Testing - Equipment Fee $250/Day (portal-to-portal) ASTM C1383 $360.00 Floor Flatness Testing FF/FL - Equipment Fee $115/Day (portal-to-portal) ASTM E1155 $360.00 Surface Frictional Properties Using Pendulum Tester - Equipment Fee $115/Day (portal-to-portal) ASTM E303 $360.00 Measuring Moisture Vapor Emission Rate (Calcium Chloride) - $55/Kit (portal-to-portal) ASTM F1869 $360.00 Relative Humidity Testing - $75/Kit (portal-to-portal) ASTM F2170 $360.00 Ferroscan - Equipment Fee $115/day (portal-to-portal) $360.00 GPR - Equipment Fee $115/day (portal-to-portal) $410.00 Dynamic Cone Penetrometer - Equipment Fee $155/day $410.00 Administration, Secretarial, Special Projects, Notary, Certified Payroll $210.00 Concrete/Grout/Mortar Mix Design Review (less than 48 hours notice - $500) $385.00 $300.00 Welding Procedure Review (less than 48 hours notice - $500) $385.00 $300.00 Procedure Qualification Record (PQR) - Standard Procedure (document fee) $560.00 Welding Procedure Specification (WPS) - Standard Procedure (document fee) $560.00 Welder Qualification Test Record (WQTR) - Standard Procedure (document fee) $560.00 DSA Interim Reports $235.00
Geotechnical Pad Letter (less than 48 hours notice - $550) $410.00 $325.00 Final Letter (less than 48 hours notice - $550) $410.00

EXPERT WITNESS TESTIMONY
Court appearance, per day $3,010.00
Court appearance, per half day $2,010.00
* Field inspection and laboratory technician services will be billed in accordance with minimums shown on Basis of Charges. **Professional engineering services will be billed in two hour increments. 2025 FEE SCHEDULE - P28838 04/08/2025

PERSONNEL FEES AND BASIS OF CHARGES

INSPECTIONS, ENGINEERING & SPECIAL SERVICES
inspecting
testing
engineering
All fees subject to Basis of Charges
DRAFT

Page 410 of 872 ends

inspecting
testing
engineering

GENERAL
MINIMUM HOURLY CHARGES – INSPECTION
Technician personnel and the following minimum charges are contractual commitment:

One-half day or less 4 Hours
Over one-half day 8 Hours
Show-up time (less than 2 hours notice = 4 hour charge) 2 Hours

WORKING HOURS AND PREMIUM TIME
Regular workday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows:

Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rate Overtime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rate Overtime Sundays (over 8 hours) and Holidays 3 x quoted hourly rate Shift differential, swing and graveyard -
(Work performed between 2:00 pm and 4:00 am) 12.5%/hour additional to base or quoted rate.

MISCELLANEOUS CHARGES - Only Where Applicable
Notary Services Fee $50.00/each
Facsimile Charges. Plus $1.00/page (n/c for cover page) $17.00/minimum Wireless Router/Data Card for Jobsite Internet $145.00/day iPad Monthly Rental Fee $110.00/month
Electronic Reporting Fees/Subscriptions (PlanGrid, BIM, etc.) At Cost Parking Fees At Cost
Air Travel Cost Plus 30%
Outside Services Cost Plus 40%
Subsistence (per Union contract) $140.00/day
Subsistence Premium: Meal Allowance (over 100 miles one way) (per Union contract) $34.00/day Subsistence Premium: Meal Allowance (over 150 miles one way) (per Union contract) $95.00/day Mileage Standard Federal Rate
Sample Pickup $40.00 $30.00
Sample Pickup Trip Charge $250/hr
Weekend Sample Pickup $160.00/each
Project Administration 30% of Monthly Invoice 15%
Samples Made by Others: Concrete Cylinders $140 + Test
Samples Made by Others: All Other Tests $85.00 + Test
Laboratory Sample Witness Fee $140.00
Laboratory Sample Storage Fee (per sample) $130.00
EZ Cure Boxes (Thermostatically Controlled Curing Boxes) QOR Returned Check Fee $160.00
Additional Sample Retention QOR
ELAS User $25.00/month
Certified Payroll $210/month
TESTS

INSURANCE

PAYMENT
Testing fees shown include normal time for prepraring, storing and performing test and will be charged regardless if samples are requested to be discarded and not tested. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering report. Please note some tests may be tested by subconsultants. Samples delivered to the laboratory after 3:00pm or samples needing results within 24 hours will incur a 50% The liability of Construction Testing Services (CTS) is limited to CTS's contract value.

Invoices will be submitted monthly or bimonthly for services performed during the preceding month and are payable on receipt. Interest of 1.5% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount.

Attorney’s fees or other costs incurred in collecting any delinquent amount shall be paid by client. Visa, MasterCard and American Express payments are accepted however fees will apply. Visa and MasterCard payments require an additional 3% on top of the amount of the invoice being paid. American Express payments require an additional 4% on top of the amount of the invoice being paid.

Fees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services will be charged at applicable rates and will require travel and mileage charges for equipment transport and storage per code (portal to portal) from the nearest CTS laboratory. Soils testing with nuclear gauge and/or sand cone equipment and inspections requiring equipment will require applicable travel and mileage charges for equipment transport and storage per code (portal-to-portal) from the nearest CTS laboratory. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. With prior notification to Client; charges are subject to change at any time. Construction Testing Services reserves the right to adjust the rates quoted in this contract based upon any Union or prevailing wage increases and/or changes in any industry requirements.

BASIS OF CHARGES
All fees subject to Basis of Charges
DRAFT

Page 411 of 872 ends

inspecting
testing
engineering
Standard Discounted
CONCRETE Rate/Each Rate/Hour
Compressive Strength of Cylindrical Concrete Specimens (6x12) ASTM C39 and CT521 $105.00 $70.00 Compressive Strength of Cylindrical Concrete Specimens (4x8) ASTM C39 and CT521 $105.00 $70.00 Compressive Strength of Cylindrical Concrete Specimens (Over 8000 PSI) ASTM C39 and CT521 $180.00 Cylinder molds. 6” x 12” and 4" x 8" ASTM C470 $100.00
Compressive Strength of Lightweight Insulating Concrete ASTM C495 $120.00 Compressive Strength of Cylindrical Concrete Core and Sawed Beam Specimens ASTM C42 $155.00 Flexural Toughness of Fiber Reinforced Concrete (Round Panel) ASTM C1550 $565.00 Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading) ASTM C78 $365.00 Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading) CT523 and CT524 $365.00 Length Change of Hardened Hydraulic-Cement Mortar and Concrete (Shrinkage, 1 Sample) ASTM C157 $190.00 Shotcrete Nozzleman Qualification Letter (Per Nozzleman, Per Position) ACI 506, ASTM C42 and C1140 $515.00 $400.00 Shotcrete Pre-Qualification Cores (Compression and Visual) ACI 506, ASTM C42 and C1140 $140.00 $95.00 Shotcrete Production Cores ASTM C1140 $140.00 $95.00
Coefficient of Thermal Expansion AASHTO T336 $590.00
Determining Density of Structural Lightweight Concrete (Cylinders) ASTM C567 $465.00 Standard Specification for Concrete Made by Volumetric Batching and Mixing ASTM C685 $3,005.00 Cement Quality Sampling CBC 2010 $715.00
Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete ASTM C472 $80.00 Splitting Tensile Strength of Cylindrical Concrete Specimens ASTM C496 $285.00 Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression ASTM C469 $265.00 Grab Sample, Sealing and Storing in a Humidity and Temperature Controlled Room CBC $175.00 Density of Hydraulic Cement ASTM C188 $235.00
Testing of Controlled Low Strength Material (CLSM) Test Cylinders ASTM D4832 $190.00 GFRC Pull Test PCI $455.00
GFRC Flexural Test PCI $455.00
Foaming Agents for Use in Producing Cellular Concrete Using Preformed Foam (Cell-Crete) ASTM C796 $615.00

MASONRY
Compressive Testing of Grout (Masonry) ASTM C1019 $150.00 $100.00 Compressive Strength of Hydraulic Cement Mortars Using 2" Cube Specimens ASTM C109 $150.00 $100.00 Compressive Strength of Masonry Prisms ASTM C1314 $225.00 $155.00 Testing Concrete Masonry Units and Related Units (Core Compression) CBC 2105A.4 $225.00 $155.00 Compressive Strength of Molded Masonry Mortar Cylinders and Cubes (2" Sample) ASTM C780 A7.6 $150.00 $100.00 Testing Concrete Masonry Units (CMU) and Related Units (Full Unit) ASTM C140 $225.00 Linear Drying Shrinkage of Concrete Masonry Units (Per Unit) ASTM C426 $330.00 Masonry Core Shear Testing CBC 2105A.4 $330.00
Testing Concrete Masonry Units (Absorption, Moisture Content, Unit Weight) ASTM C140 $405.00 Brick and Clay Tile (modulus of rupture, compression, saturation coefficient, suction rate, efflorescence)* ASTM C67 $1,065.00 Mortar Molds. 2” x 4”. Single Use $150.00
Mortar or Grout, Stored and Cured, Not Tested (Including Mold) $150.00 Veneer Bond Testing, does not include sample fabrication (Set of 5) ASTM C482 $540.00

AGGREGATES (CONCRETE AND SOILS)
Sieve Analysis of Coarse Aggregates (Coarse Only 2" - No.4)(sample size over 2" QOR) ASTM C136, CT202, and AASHTO T-27 $260.00 $210.00 Sieve Analysis of Fine Aggregates (Fine Only, Wash Included No.4 - No.200) ASTM C136/C117, CT202, and AASHTO T27/AASHTO T-11 $330.00 $285.00 Sieve Analysis of Combined Fine and Coarse Aggregates (Wash Included 2" - No.200) (sample size over 2" QOR)
ASTM C136/C117, CT202, and AASHTO T27/AASHTO T-11 $415.00 $325.00 Materials Finer Than 75-µm (No. 200) Sieve in Mineral Aggregates by Washing (200 Wash) ASTM C117, CT202, and AASHTO T-11 $260.00 Evaluating Cleanness of Coarse Aggregate CT227 $415.00
Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate ASTM C88, CT214, and AASHTO T-104 $905.00 Bulk Density/Unit Weight of Aggregate ASTM C29, CT212, and AASHTO T-19 $240.00 Clay Lumps and Friable Particles in Aggregates ASTM C142 and AASHTO T-19 $265.00 Flat Particles, Elongated Particles or Flat and Elongated Particles in Coarse Aggregate ASTM D4791 and CT235 $430.00 Organic Impurities in Fine Aggregates for Concrete ASTM C40 and CT213 $430.00 Density, Relative Density(Specific Gravity), and Absorption of Coarse Aggregate ASTM C127, CT206, and AASHTO T-85 $430.00 Density, Relative Density(Specific Gravity), and Absorption of Fine Aggregate ASTM C128, CT207, and AASHTO T-84 $430.00 Resistance to Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C131, C211, and AASHTO T-96 $580.00
Resistance to Degradation of Large Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C535 $580.00
Percentage of Crushed Particles/Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate ASTM D5821, CT205, and AASHTO T-335 $465.00 Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading) ASTM C1252, CT234, and AASHTO T304A $465.00
Sand Equivalent Value of Soils and Fine Aggregate ASTM D2419, CT217, and AASHTO T-176 $330.00 $285.00 Durability Index (Fine) ASTM D3744, CT229, AASHTO T-210 $465.00 $345.00 Durability Index (Coarse) ASTM D3744, CT229, AASHTO T-210 $465.00 $345.00 Durability Index (Fine and Coarse) ASTM D3744, CT229, AASHTO T-210 $605.00 $505.00 Lightweight Particles in Aggregate ASTM C123 and AASHTO T113 QOR Resistance of Rock to Wetting and Drying CRD-C169 $640.00 Aggregate Moisture Content ASTM C566 $640.00
*Unusual sample preparation for brick specimen will be charged at the established hourlylab technician rate. Cost for test is for samples will not be discounted for samples discarded.

CONCRETE AND MASONRY TESTS
All fees subject to Basis of Charges
DRAFT

Page 412 of 872 ends

inspecting
testing
engineering
Standard Discounted
SOILS Rate/Each Rate/Hour
Moisture Content of Soil by Oven ASTM D2216, CT226, and AASHTO T-265 $185.00 $145.00 Moisture Content of Soil by Microwave Oven ASTM D4643 $240.00 $185.00 Density and Unit Weight of Soil Specimens (Moisture Density) ASTM D7263 $265.00 $165.00 Density of Soil in Place by the Drive-Cylinder Method including Moisture Content of Soil by Oven ASTM D2937 $270.00 $175.00 Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Permeability) ASTM D5084 $615.00 Permeability Additional Cell Time $50.00
Remold of Soil Samples Varies $165.00
Direct Shear Test of Soils Under Consolidated Drained Conditions (per point) ASTM D3080 $615.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (2-4") (three points) ASTM D4767 $1,575.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (added points) ASTM D4767 $625.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (single point) ASTM D4767 $625.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (includes 3 points)(includes Pore Pressures) ASTM D4767 $1,965.00
Consolidated Undrained Triaxial Compression Test for Cohesive Soils (added points)(includes Pore Pressures) ASTM D4767 $665.00
Consolidated Undrained Triaxial Compression Test for Cohesive Soils (single point)(includes Pore Pressures) ASTM D4767 $665.00
Unconsolidated Undrained Triaxial Compression Test for Cohesive Soils (per point) ASTM D2850 $270.00 Unconsolidated Undrained Triaxial Compression Test for Cohesive Soils with added backpressure saturation (per point) ASTM D2850 $330.00
One-Dimensional Consolidation Properties of Soils Using Incremental Loading ASTM D2435 $590.00 Unconfined Compressive Strength of Cohesive Soil ASTM D2166 and CT221 $505.00 $425.00 Compressive Strength of Molded Soil-Cement Cylinders ASTM D1633 $505.00 Particle-Size Analysis of Soils (with Hydrometer) ASTM D422 $675.00 Particle-Size Analysis of Soils (without Hydrometer) ASTM D422 $615.00 Particle-Size Distribution of Fine Grained Soils using Sedimentation Analysis ASTM D7928 and ASTM D422 $615.00 Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (2" - No.200) (sample size over 2" QOR) ASTM D6913 $400.00 $275.00
Material Finer than No.200 by Washing (200 Wash) ASTM D1140 $250.00 $175.00 Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D4318 and CT204 $615.00 $475.00 Determination of Organic Soils Classification using Liquid Limit of Soils ASTM D4318/D2487 $790.00 Organic Content of Soils and Peat ASTM D2974 $345.00
Unified Soil Classification System (USCS) Test ASTM D2487 $365.00 Moisture-Density Relations of Soil Using Modified Effort (Modified Proctor) ASTM D1557 $540.00 $425.00 Moisture-Density Relations of Soil Using Standard Effort (Standard Proctor) ASTM D698 $540.00 Moisture-Density Relations of Soil Using Modified DWR Method DWR Modified $540.00 Moisture-Density Relations of Soil Using Rapid Compaction Method ASTM D5080 $540.00 Moisture-Density Relations of Soil-Cement Mixtures ASTM D558 $540.00 Moisture-Density Relations of Soil, 1 Point Check Point ASTM D698 $415.00 Moisture-Density Relations of Soil, 2 Point Check Point ASTM D698 $465.00 Moisture-Density Relations of Soil, 3 Point Check Point ASTM D698 $540.00 Moisture-Density Relations of Soil, 1 Point Check Point ASTM D1557 $415.00 Moisture-Density Relations of Soil, 2 Point Check Point ASTM D1557 $465.00 Moisture-Density Relations of Soil, 3 Point Check Point ASTM D1557 $540.00 Maximum Index Density and Unit Weight of Soils Using a Vibratory Table ASTM D4253 $565.00 Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density ASTM D4254 $345.00 Maximum Dry Unit Weight of Granular Soils Using a Vibrating Hammer ASTM D7382 $515.00 Relative Compaction of Untreated and Treated Soils and Aggregates CT216 $615.00 Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabiliometer ASTM D2844 and CT301 $755.00 $515.00
Expansion Index of Soils ASTM D4829 $515.00 $435.00
Standard Test Methods for Specific Gravity of Soil Solids by Water Pycnometer ASTM D854 $415.00 pH of Soils ASTM D4972 $565.00
Density of Hydraulic Cement ASTM C188 $390.00
Volatile Organic Content EPA 8260B QOR
Semi Volatile Organics by GC/Ms (Basic Target List) EPA 8270C QOR Total Organic Carbon ASTM 2974/EPA 5310Bm QOR
ICP Metals Concentration EPA 6020 - CAM/CCR 17 QOR
Total Extractable Petroleum Hydrocarbons: TPH, MTBE, Benzene,Toluene, Ethylbenzene, Zylenes, %SS EPA 8015B QOR ICP Metals Concentration EPA 6020 QOR
pH EPA 9045D $615.00
Sequential Batch Extraction of Waste with Acidic Extraction Fluid ASTM D5284 QOR Chromium Soluble EPA 7196A QOR
Caltrans Corrosivity Package $655.00 $510.00
Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water CT643 QOR Soils and Waters for Sulfate Content CT417 QOR
Soils and Waters for Chloride Content CT422 QOR
Pore Water Extraction and Determination of the Soluble Salt Content of Soils by Refractometer ASTM D4542 $715.00 California Bearing Ratio Test (does not include moisture density relations) ASTM D1883 $755.00 Bentonite Slurry Testing QOR
Unconfined Compressive Strength of Lime Treated Soils and Aggregates CT 373 (4 pts) $1,510.00 Unconfined Compressive Strength of Lime Treated Soils and Aggregates CT 373 (3 pts) $1,135.00 ** Does not include sample preparation or sieve analysis * Unusual sample preparation (dried clays, saturated clays, etc.) and all other tests for treated or untreated soils, aggregate subbase and aggregate base will be charged at established rates for laboratory technician. Cost for test is for samples will not be discounted for samples discarded.

SOILS AND AGGREGATE SERVICES AND TESTS
All fees subject to Basis of Charges
DRAFT

Page 413 of 872 ends

inspecting
testing
engineering
Standard Discounted
HOT MIX ASPHALT Rate/Each Rate/Hour
Thickness/Height of Compacted Bituminous Paving Mixture Specimens Field Cores ASTM D3549 and CT308 $215.00 Bulk Specific Gravity of Compacted Bituminous Mixture (Individual field cores or lab compacted) ASTM D1188, ASTM D2726, CT308, AASHTO $330.00 Lab Compaction Only of Bituminous Mixture by Marshall Apparatus (Marshall) (Per Specimen) ASTM D6926 $330.00 Lab Compaction Only of Bituminous Mixture by CA Kneading Compactor (HVEEM) (Per Specimen) ASTM D1561, CT304, and AASHTO T-247 $330.00 Lab Compaction Only of Bituminous Mixture by Superpave Gyratory (Superpave) (Per Specimen) ASTM D6925, and AASHTO T-312 $330.00 Laboratory Test Max Density (LTMD) (5 Specimen, includes compaction of specimen and bulk specific ASTM D1561/(D1188 and D2726) and $1,165.00 Superpave Bulk specific gravity (includes gyratory compaction of 3 specimen and bulk specific gravity) AASHTO T-312/T-275/T-166 $1,165.00 Marshal Lab Compacted Max Density (3 Specimen, includes compaction of specimen and bulk specific ASTM D6926/(D1188 and D2726) $1,165.00 Theoretical Maximum Specific Gravity and Density (Rice) ASTM D2041, CT309, and AASHTO T-209 $515.00 $325.00 Marshall Stability and Flow of Bituminous Mixtures (average Set of 3, includes sample compaction) ASTM D6926/ASTM D6927 $1,165.00 Measuring the Permeability of Bituminous Pavements and Seal Coats CT341 QOR Swell of Bituminous Mixtures CT305 $455.00
Moisture Vapor Susceptibility of Bituminous Mixtures/Moisture or Volatile Distillates in Asphalt ASTM D1461 and CT307 $1,015.00 Stabilometer Value of field compacted cores (Per Specimen) ASTM D1560, CT366, and AASHTO T-246 $460.00 Stabilometer Value of Lab compacted samples (Average of 3 Specimen, Includes Sample Compaction) ASTM D1561/D1560, CT304/CT366, and $1,165.00 Determination of Asphalt Content of Bituminous Paving Mixtures by the Ignition Method ASTM D6307, CT382, and AASHTO T-308 $465.00 Determination of Correction Factor of Bituminous Paving Mixtures by the Ignition Method ASTM D6307, CT382, and AASHTO T-308 $1,505.00 Quantitative Extraction of Bitumen from Bituminous Paving Mixtures (Solvent) ASTM D2172 and CT310 $815.00 Mechanical Size Analysis (Coarse and Fine) of Extracted Aggregate (Afterburn Gradation) ASTM D5444, CT202, and AASHTO T-30 $465.00 Moisture Content of Bituminous Mixture CT370 and AASHTO T-329 $490.00 Effect of Water on Compressive Strength of Compacted Bituminous Mixtures (Set of 6) ASTM D1075 $3,715.00 Compressive Strength of Bituminous Mixtures ASTM D1074 $365.00 Hamburg Wheel Track (includes compaction by gyratory)(includes 2 runs) AASHTO T324/ CT389 $4,015.00 Tensile Strength Ratio (TSR) Moisture Susceptibility (includes compaction of 6 Specimen ASTM D4867 and AASHTO T-283 $4,015.00 Tensile Strength Ratio (TSR) Moisture Susceptibility (includes compaction of 12 Specimen) CT371 $6,015.00 Indirect Tensile (IDT) Strength of Bituminous Mixtures ASTM D6931 $3,765.00 Air Voids Calculation of Compacted Bituminous Mixture ASTM D3203, CT367, and AASHTO T-269 $230.00 PG Verification (Determining Low Temperature Performance Grade (PG) of Asphalt Binders) ASTM 6816 QOR Voids In Mineral Aggregate MS-2 Asphalt Mixture Volumetrics QOR Dust Proportion MS-2 Asphalt Mixture Volumetrics QOR

MATERIALS MECHANICAL TESTS
Mechanical Testing of Steel Products (General Tensile) ASTM A370 $565.00 $395.00 Fillet Weld Break Test for Qualification (Welding) AWS B4.0 $265.00 Tension Testing of Metallic Materials, Tension Testing Wrought and Cast Aluminum and Magnesium-Alloy ASTM E8, B557 and AWS B4.0 $565.00 Mechanical Testing of Steel Products (Couplers); #3-#11 ASTM A370/ CT670 $755.00 Mechanical Testing of Steel Products (Couplers); #14+ ASTM A370/ CT670 $1,505.00 Caltrans Welded Hoop Tensile Test Caltrans Spec Section 52, CT 670 $455.00 Impact Testing of Miniaturized Charpy V-Notch Specimens, Notched Bar Impact Testing of Metallic ASTM E2248 and ASTM E23 QOR Testing, Practices, and Terminology for Chemical Analysis of Steel Products ASTM A751 $390.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #3-#8 ASTM A370 and E290 $455.00 $365.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #9-#11 ASTM A370 and E290 $515.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #14+ ASTM A370 and E290 $1,505.00 Mechanical Testing of Steel Products, Standard Specification for Steel Wire, Plain, for Concrete ASTM A370, A82 and A185 $515.00 Guided Bend Test for Ductility of Welds, Mechanical Testing of Welds ASTM E190 and AWS B4.0 $365.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Anchor Bolts Only ASTM F307, F1554 and F606 $615.00 $445.00 Rockwell Hardness of Metallic Materials ASTM E18 $200.00 Proof Test for Carbon and Alloy Steel (Nuts Only) ASTM A194 or A563 $390.00 Radiographic Examination of Metallic Castings/Weldments ASTM E94, E1030 and E1032 QOR Macroetching Metals and Alloys ASTM E340, E381 and AWS $390.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct ASTM F606 $440.00 Mechanical Testing of Steel Products (Terminators Tensile) ASTM A370 $440.00 Strength for Sewn or Bonded Seams of Geotextiles ASTM D4884 $390.00 Tearing Strength of Fabrics by the Tongue (Single Rip) Procedure ASTM D2261 $390.00 Breaking Strength and Elongation of Textile Fabrics (Grab Test) ASTM D5034 $340.00 Tensile Properties of Fiber Reinforced Polymer Matrix Composite Bars ASTM D3039 $1,065.00 Steel Strand, Uncoated Seven-Wire for Prestressed Concrete (Set of 2) ASTM A416 and A1061 $1,615.00

FIREPROOFING
Thickness and Density of Sprayed Fire-Resistive Material (SFRM) ASTM E605 $310.00 $225.00 Cohesion/Adhesion of Sprayed Fire-Resistive Materials (Test Kit Only) ASTM E736 $100.00 $75.00

CONTACT INFORMATION
Headquarters: 2118 Rheem Drive • Pleasanton, CA 94588 • P 925.462.5151 • F 925.462.5183 Peninsula: 1793 Union Street • San Francisco, CA 94123 • P 415.334.4747 • F 415.438.2357 Oakland: 246 30th Street, Suite 101 • Oakland, CA 94601 • P 510.444.4747 • F 510.835.1825 Stockton: 343 East Main Street, #711 • Stockton, CA 95202 • P 209.507.7555 • F 209.507.7554 Rocklin: 4400 Yankee Hill Road • Rocklin, CA 95677 • P 916.419.4747 • F 916.419.4774 Las Vegas: 3842 E. Post Road • Las Vegas, NV 89120 • P 702.257.4747 • F 702.257.4718

ASPHALTIC CONCRETE SERVICES AND TESTS

MECHANICAL TESTS AND FIREPROOFING
San Jose: 2033 Gateway Place, #500 • San Jose, CA 95110 • P 408.573.6992 • F 408.437.1201 All fees subject to Basis of Charges
DRAFT

Page 414 of 872 ends

Appendix C: Attachment C,
DRAFT

Page 3 ends
Page 415 of 872 ends

SPECIAL INSPECTION &

TESTING AGREEMENT
Neighborhood
Services
Effective:

Revised: May 7, 2018
150 City Park Wy, Brentwood, CA 94513 (925) 516-5405 Voice (925) 516-5407 Fax

STRUCTURAL TESTS & INSPECTIONS SCHEDULE
REINFORCING STEEL:
__ Tensile & Bond
__ Inspection of Placement
__ Inspection of Welding
STRUCTURAL STEEL:
__ Sample & Test
__ Shop Indent. & Welding Inspection
__ Shop Ultrasonic Inspection
__ Shop Radiography
__ Field Welding Inspection
__ Field Bolting
__ Field Ultrasonic Inspection
__ Field Radiography
__ Metal Deck Welding Inspection
MASONRY:
__ Preliminary Acceptance Tests (masonry units, wall prisms) __ Subsequent Tests (mortar, grout, field wall prisms)
__ Inspection of Grouting
__ Inspection of Placement & Grouting
Conc Shot‐
crete
Grout Mortar
Agg. Tests for Designs
Suitability of Agg.

Mix Designs
Test Panel
Batch Plant Insp.

Cement Grab Sample
Inspect Placing
Compression Tests
Cast Specimens
Pick‐up Samples
Shrinkage Bars
Yield Check
Air Check
Dry Unit Weight
PILING, CAISSONS, CAPS, TIES:
__ Inspection of Reinforcing Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
STRUCTURAL HARDWARE:
__ Holdown Installation
__ Tiedown System Installation
__ Epoxied Anchors & Bolts
INSULATING CONCRETE:
__ Sample & Tests
__ Unit Weights
FIREPROOFING:
__ Inspection of Placement
__ Density Tests
__ Thickness Tests
__ Inspect Batching
GEOTECHNICAL: (Inspections & Testing by Geotechnical Engineer) __ Fill Material Acceptance Tests
__ Moisture‐Density Determination
__ Field Density/Compaction
__ Pier Drilling
__ Observation & Testing by Soils Engineer
UNDERPINNING:
__ Inspection of Steel Fabrication
__ Inspection of Reinforcing & Forms
__ Inspection of Concrete Placement
__ Inspection of Tiebacks
ROOFING & WATERPROOFING:
_ Sample & Test
Basement Waterproofing
CONCRETE, GUNITE, GROUT & MORTAR:

PRECAST CONCRETE:
__ Reinforcement Tests
__ Inspection of Reinforcing Placement
__ Tendon Tests
__ Inspection of Tendon Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
__ Inspection of Panel Attach & Inserts
__ Inspection of Panel Installation
__ Compression Tests
__ Inspection of Stressing/Transfer
STRUCTURAL WOOD:
__ Inspection of Fabrication
__ Inspection of Truss Joist Fab.
__ Sample & Test Components
__ Inspection of Glu‐lam Fab.
__ Shearwall Construction & Nailing
OTHER TESTS OR INSPECTIONS:
____________________________________________________
____________________________________________________
____________________________________________________
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
_ _ Inspection of Placement
__
__
X
X
X
X
X
Firestopping
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DRAFT

Page 416 of 872 ends

PSA_PW_City Attorney Approved Version 053025

AGREEMENT FOR GEOTECHINICAL/CONSTRUCTION MATERIALS TESTING SERVICES Twining, Inc.

THIS AGREEMENT is made and entered into as of the _____ day of __________________, 20_____ by and between the City of Brentwood, a municipal corporation of the State of California ("City"), and Twining, Inc., a California Corporation ("Consultant") (each a “Party” and collectively, the “Parties”).

RECITALS
A. City requires the professional services of a consultant specifically trained and experienced in geotechnical/construction materials testing services, which are professional services outside of services offered by City.

B. Consultant has the professional skills and experience necessary to perform the services described in this Agreement.

C. Consultant customarily engages in these services as part of its independently established trade, occupation, and/or business, separately from its work for City.

D. City desires to engage Consultant to provide these services because of its qualifications and experience in performing such services
E. Consultant has submitted a proposal to City and has affirmed its willingness and ability to perform such work on the terms and manner set forth in this Agreement.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, the Parties agree as follows:

1. Scope of Work.

1.1 City retains Consultant, as an independent contractor, to perform, and Consultant agrees to render, those services (the "Services") that are described in the attached Exhibit "A," which is incorporated by this reference, pursuant to this Agreement’s terms and conditions.

1.2 Consultant will control the manner and the means of the work to be performed, and be responsible for the professional quality, technical accuracy and coordination of the Services. Consultant will, without additional compensation, correct or revise any errors or deficiencies in the Services.

1.3. Consultant will keep City informed on a regular basis that the Services are being performed in accordance with the requirement and intentions of this Agreement.

1.4 If applicable, Consultant has designated those persons listed in Exhibit “A” to provide the Services to the City. Consultant will not change or reassign those persons described in Exhibit “A” without prior written notice to City, and will not replace those individuals with individuals to whom City has a reasonable objection.

2. Standard of Performance. Consultant acknowledges that in entering into this Agreement the City is relying on Consultant's special skills and experience to do and perform the Services. While performing the Services, Consultant will exercise the reasonable professional care and skill customarily exercised by reputable members of Consultant's profession practicing in the Northern California area. The acceptance of the Services by City does not release Consultant from these obligations.

Consultant will be responsible for employing or engaging all persons necessary to perform the Services.

Consultant will control the manner and means of the services to be performed by its employees and subconsultants. All of Consultant's staff will be qualified by training and experience to perform their assigned tasks. Consultant will give its personal attention to the fulfillment of the provisions of this DRAFT

Page 417 of 872 ends

2 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx Agreement by all of its employees and subcontractors, if any, and will keep the Services under its control.

On demand of City, if any employee or subcontractor of Consultant fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the Services.

3. Term. Unless earlier terminated, the term of this Agreement will be effective from July 1, 2025 through June 30, 2026. The City Manager may amend the Agreement to extend it for two (2) additional one (1) year periods or parts thereof in an amount not to exceed two hundred thousand dollars ($200,000) per Agreement year. Extensions will be based upon a satisfactory review of Consultant's performance, City needs, and appropriation of funds by the City Council. The parties will prepare a written amendment indicating the effective date and length of the extended Agreement.

4. Schedule. Consultant will generally adhere to the schedule set forth in Exhibit “A” provided, that City will grant reasonable extensions of time for the performance of the Services occasioned by unusually lengthy governmental reviews of Consultant’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Consultant’s officers or employees.

Consultant acknowledges the importance to City of City’s project schedule and agrees to put forth its best professional efforts to perform the Services in a manner consistent with that schedule. City understands, however, that Consultant’s performance must be governed by sound practices. Consultant will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

5. Compensation.

5.1 The total fee payable for the Services to be performed during the term of this Agreement will be a not to exceed amount of two hundred thousand dollars ($200,000) as may be further specified in the attached Exhibit “A.” No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City reserves the right to withhold a ten percent (10%) retention until City has accepted the Services.

5.2 Payment will occur only after receipt by City of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City.

5.3 Within thirty (30) days after receipt of any applicable progress payment request, City will verify the accuracy of the request, correct the charges where appropriate, and make payment to Consultant in an amount equal to the amount of such application, as verified or corrected by City. No payment made prior to completion and acceptance of the Services will constitute acceptance of any part of the Services.

City reserves the right to withhold payment from Consultant because of Services not performed satisfactorily, delays in Consultant's performance of Services, or other defaults hereunder.

6. Status of Consultant. Consultant will perform the Services as an independent contractor, free from the control and direction of City, in pursuit of Consultant’s independent calling, and not as an employee of City. The persons used by Consultant to provide the Services under this Agreement will not be considered employees of City for any purposes whatsoever and City will not pay any tax, workers’ compensation insurance, retirement contributions or unemployment contributions on behalf of Consultant or its employees or subcontractors. Consultant agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers’ compensation payment, including, but not limited to, those based on any provision of the Federal Affordable Care Act, which City may be required to make on behalf of Consultant or any agent, employee, or contractor of Consultant for work done under this Agreement. The payment made to Consultant pursuant to the Agreement will be the full and complete compensation to which Consultant is entitled. City will not make any federal or state tax withholdings on behalf of Consultant or its agents, employees or subcontractors.

DRAFT

Page 418 of 872 ends

3 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Consultant.

7. Subcontracting. Consultant's services are being requested by City because they are unique and personal. Except as may be specified in Exhibit “A”, Consultant will not subcontract any portion of the Services without prior written approval of City Manager or their designee. If Consultant subcontracts any of the Services, Consultant will be fully responsible to City for the acts, errors and omissions of Consultant's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Consultant is for the acts and omissions of persons directly employed by Consultant. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Consultant and City.

Consultant will be responsible for payment of subcontractors. Consultant will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Consultant's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

8. Other Consultants. The City reserves the right to employ other consultants in connection with the Services.

9. Indemnification. Consultant agrees to indemnify, including the cost to defend, City, its officers, agents, volunteers and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this Agreement, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful misconduct or defects in design by City or the agents, servants, or independent contractors who are directly responsible to City, or arising from the active negligence of City.

10. Insurance. Consultant will obtain and maintain, at its cost and expense, for the duration of the Agreement and any amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the Services by Consultant or Consultant’s agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A:VII."

10.1 Coverages and Limits. Consultant will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Consultant's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Consultant pursuant to this Agreement are adequate to protect Consultant. The coverage will contain no special limitations on the scope of its protection to the above-designated insureds except for Workers Compensation and errors and omissions insurance. Consultant will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Consultant believes that any required insurance coverage is inadequate, Consultant will obtain such additional insurance coverage, as Consultant deems adequate, at Consultant's sole expense.

10.1.1 Commercial General Liability Insurance. $2,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

10.1.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

10.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Consultant has no employees and provides, to City's satisfaction, a declaration stating this.

DRAFT

Page 419 of 872 ends

4 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

10.1.4 Professional Liability. Errors and omissions liability appropriate to Consultant’s profession with limits of not less than $1,000,000 per claim.

10.2 Endorsements. For Commercial General Liability Insurance, Consultant will ensure that the policies are endorsed to name the City, its officers, agents, volunteers and employees as additional insureds. Prior to City's execution of this Agreement, Consultant will furnish, to the satisfaction of the City, certificates of insurance and endorsements.

10.3 Cancellation. Insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent pursuant to the notice provisions of this Agreement.

10.4 Failure to Maintain Coverage. If Consultant fails to maintain any of these insurance coverages, then City will have the option to declare Consultant in breach of this Agreement, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Consultant is responsible for any payments made by City to obtain or maintain insurance and City may collect these payments from Consultant or deduct the amount paid from any sums due Consultant under this Agreement.

10.5 Submission of Insurance Policies. City reserves the right to require, at any time, complete and certified copies of any or all required insurance policies and endorsements.

10.6 Primary Coverage. For any claims related to the Services and this Agreement, the Consultant’s insurance coverage will be primary insurance with respect to City, its officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City for itself, its officers, agents, volunteers and employees, will be in excess of Consultant’s insurance and not contributory with it.

10.7 Reduction in Coverage/Material Changes. Consultant will notify City in writing pursuant to the notice provisions of this Agreement thirty (30) days prior to any reduction in any of the insurance coverage required pursuant to this Agreement or any material changes to the respective insurance policies.

10.8 Waiver of Subrogation. The policies will contain a waiver of subrogation for the benefit of City.

11. Business License. If required, Consultant will obtain and maintain a City of Brentwood Business License for the term of the Agreement, as it may be amended from time-to-time.

12. Maintenance of Records. Consultant will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Consultant will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Consultant will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

13. Ownership of Documents.

13.1 All product produced by Consultant or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Consultant or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. Consultant will have the right to make one (1) copy of the Work Product for Consultant’s records.

13.2 The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Consultant; provided, however, that if this Agreement is terminated for any reason prior to completion of the Project and if under such circumstances City uses, DRAFT

Page 420 of 872 ends

5 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx or engages the services of and directs another consultant to use, the Work Product, City agrees to hold Consultant harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Consultant, or anyone for whose acts it is responsible, in preparation of the Work Product. Consultant will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

14. Copyrights. Consultant agrees that all copyrights that arise from the Services will be vested in City and Consultant relinquishes all claims to the copyrights in favor of City.

15. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Consultant will not make any of these documents or information available to any individual or organization not employed by the Consultant or the City without the written consent of the City before any such release.

16. Notices. Any notices relating to this Agreement will be given in writing and will be deemed sufficiently given and served for all purposes when delivered personally, by facsimile or by generally recognized overnight courier service, or five (5) days after deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, addressed as follows:

For City:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Phone No. (925) 516-5307
Attn: Vatsal Patel, Engineering Manager
For Consultant:

Name: Twining, Inc.

Title: Project Manager
Address: 5027 Commercial Circle, Suite G
Concord, CA 94520
Phone No.: 925-849-8186
Attn: Taylor Latimer, P.E.

Either Party may change its address for purposes of this section by giving the other Party written notice of the new address in the manner set forth above.

17. Conflicts of Interest.

17.1 City will evaluate Consultant’s duties pursuant to this Agreement to determine whether disclosure under the Political Reform Act and City’s Conflict of Interest Code is required of Consultant or any of Consultant’s employees, agents, or subcontractors. Should it be determined that disclosure is required, Consultant or Consultant’s affected employees, agents, or subcontractors will complete and file with the City Clerk those schedules specified by City and contained in the Statement of Economic Interests Form 700.

17.2 Consultant understands that its professional responsibility is solely to City. Consultant warrants that it presently has no interest, present or contemplated, and will not acquire any direct or indirect interest, that would conflict with its performance of this Agreement. Consultant further warrants that neither Consultant, nor Consultant’s agents, employees, subcontractors and consultants have any ancillary real property, business interests or income that will be affected by this Agreement or, alternatively, that Consultant will file with the City an affidavit disclosing this interest. Consultant will not knowingly, and will take reasonable steps to ensure that it does not, employ a person having such an interest in the performance of this Agreement. If after employment of a person, Consultant discovers that it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant will promptly disclose the relationship to the City and take such action as the City may direct to remedy the conflict.

DRAFT

Page 421 of 872 ends

6 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

18. General Compliance with Laws. Consultant will keep fully informed of federal, state and local laws, ordinances, and regulations (“Laws”) that in any manner affect those employed by Consultant, or in any way affect Consultant’s performance of the Services. Consultant will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the Services with all applicable laws, ordinances, and regulations.

19. Pandemic Health Laws. Consultant’s duty to comply with Laws includes compliance by Consultant with all local, state, or federal Laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”), which include all of the County of Contra Costa Health Orders. Failure to fully comply with the Health Laws constitutes a material default, subject to all available remedies including suspension or termination.

20. Discrimination and Harassment Prohibited. Consultant will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment.

21. Labor Code Compliance. If this Agreement exceeds $1,000, it is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, beginning at section 1720, and the related regulations, including but not limited to requirements pertaining to wages, working hours and workers’ compensation insurance. Consultant must also post all job site notices required by laws or regulations pursuant to Labor Code section 1771.4.

21.1 Prevailing Wages. Each worker performing Services under this Agreement that is covered under Labor Code section 1720 or 1720.9, must be paid at a rate not less than the prevailing wage as defined in sections 1771 and 1774 of the Labor Code. The prevailing wage rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR. Pursuant to Labor Code section 1775, Consultant and any subconsultant or subcontractor will forfeit to the City as a penalty up to $200 for each calendar day, or portion of a day, for each worker paid less than the applicable prevailing wage rate, in addition to paying each worker the difference between the applicable wage rate and the amount actually paid.

21.2 Working Day. Pursuant to Labor Code section 1810, eight hours of labor consists of a legal day’s work. Pursuant to Labor Code section 1813, Consultant will forfeit to the City as a penalty the sum of $25 for each day during which a worker employed by Consultant or any subconsultant or subcontractor is required or permitted to work more than eight hours during any one calendar day, or more than 40 hours per calendar week, unless such workers are paid overtime wages under Labor Code section 1815.

21.3 Payroll Records. Consultant and its subconsultants or subcontractors must maintain certified payroll records in compliance with Labor Code sections 1771.4, 1776 and 1812, and all implementing regulations promulgated by the Department of Industrial Relations (“DIR”). For each payroll record, Consultant and its subconsultants or subcontractors must certify under penalty of perjury that the information in the record is true and correct, and that it has complied with the requirements of Labor Code sections 1771, 1811, and 1815. Unless the Agreement price is under $25,000, Consultant must electronically submit certified payroll records to the Labor Commissioner as required under California law and regulations.

21.4 Apprentices. If the Agreement price is $30,000 or more, Consultant must comply with the apprenticeship requirements in Labor Code section 1777.5.

21.5 DIR Monitoring, Enforcement, and Registration. The Services are subject to compliance monitoring and enforcement by the DIR pursuant to Labor Code section 1725.5, and, subject to the exception set forth below, Consultant and any subconsultants or subcontractors must be registered with the DIR to perform public works projects. The registration requirements of Labor Code section 1725.5 do not apply if the Agreement price is for under $25,000.

DRAFT

Page 422 of 872 ends

7 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

21.6 Workers’ Compensation Certification. Under Labor Code section 1861, by signing this Agreement Consultant certifies as follows: “I am aware of the provisions of Labor Code section 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work on this contract.”

22. Termination. In the event of the Consultant's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperformance by notifying Consultant in writing pursuant to the notice provisions of this Agreement. Consultant has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Consultant has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Consultant, whether located at the project site, at Consultant's place of business, or at the offices of a subconsultant.

Either Party, upon tendering thirty (30) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Consultant will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Consultant will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

23. Covenants against Contingent Fees. Consultant warrants that Consultant has not employed or retained any company or person, other than a bona fide employee working for Consultant, to solicit or secure this Agreement, and that Consultant has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

24. Claims and Lawsuits. By signing this Agreement, Consultant agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Consultant acknowledges that if a false claim is submitted to City by Consultant, it may be considered fraud and Consultant may be subject to criminal prosecution. Consultant acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. Consultant acknowledges that the filing of a false claim may subject Consultant to an administrative debarment proceeding as the result of which Consultant may be prevented to act as a Consultant on any public work or improvement for a period of up to five (5) years. Consultant acknowledges debarment by another jurisdiction is grounds for City to terminate this Agreement.

25. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Contra Costa, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This agreement will be governed by the laws of the State of California.

26. Testimony. Consultant will testify at City's request if litigation is brought against City in connection with Consultant's services under this agreement. Unless the action is brought by Consultant, or is based upon Consultant's actual or alleged negligence or other wrongdoing, City, upon prior written agreement DRAFT

Page 423 of 872 ends

8 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx with Consultant will compensate Consultant for time spent in preparation for testimony, testimony, and travel at Consultant's standard hourly rates at the time of actual testimony.

27. Successors and Assigns. It is mutually understood and agreed that this Agreement will be binding upon the Parties and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Consultant without the prior written consent of City, which will not be unreasonably withheld.

28. Section Headings. Section headings as used in this Agreement are for convenience only and will not be deemed a part of such sections and will not be construed to change the meaning of the section.

29. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law.

The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

30. Entire Agreement. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to nonmaterial amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties.

31. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Consultant each represent and warrant that they have the legal power, right and actual authority to bind Consultant to the terms and conditions of this Agreement.

DRAFT

Page 424 of 872 ends

9 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx

32. Severability. If any term, provision, condition or covenant of this Agreement or its application to any party or circumstances will be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, will not be affected, and will be valid and enforceable to the fullest extent permitted by law.

33. Signatures.

33.1 Counterparts. This Agreement may be executed in two or more counterparts, each of which together will be deemed an original, but all of which together will constitute the same instrument.

33.2 Digital/Electronic Signatures. Using a City-approved method, this Agreement may be executed using digital or electronic signatures in accordance with Government Code Section 16.5. The presence of an electronic signature on this Agreement will be construed as the Parties’ consent to do business electronically.

CONSULTANT:
* By:

Printed Name:

Title:
** By:

Printed Name:

Title:

CITY:

By:

Darin Gale, Interim City Manager
ATTEST:

By:

Amanda McVey, City Clerk
APPROVED AS TO FORM:

By:

Katherine Wisinski, City Attorney
If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, Agreement must be signed by one corporate officer from each of the following two groups. *Group A. **Group B.

Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

If an LLC:
• The Agreement must be signed by a Managing Member or the LLC must attach a resolution empowering the signatory to bind the LLC.

If a partnership:
• The Agreement must be signed by the Managing Partner or the Partner authorized to execute agreements of this type. Additional documentation, such as the partnership agreement, confirming this signature authority may be required.

DRAFT

Page 425 of 872 ends

10 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx If a sole proprietorship:
• The Agreement must be signed by the owner.

DRAFT

Page 426 of 872 ends

11 PSA_PW_City Attorney Approved Version 053025
CA/Agmts/FTA/PSA/2022/087.1 – PSA Agmt Over $10K with PW.docx EXHIBIT “A”

SCOPE OF SERVICES
Consultant will perform the following Services, at the rates indicated below.

DRAFT

Page 427 of 872 ends

CITY OF BRENTWOOD

STATEMENT OF QUALIFICATIONS FOR
Geotechnical/Construction Materials Testing Services
April 10, 2024
DRAFT

Page 428 of 872 ends

TABLE OF CONTENTS
A. Letter of Transmittal................................................... 1 B. Subcontractors ........................................................... 2 C. Submittal Approach.................................................... 3 D. Agreement Provisions.............................................. 15 E. Conflict of Interest.................................................... 16 F. Attachments .............................................................. 17 Resumes.................................................................... 17 Rate Schedule............................................................ 34 Exhibits and/or Other Documentation ..................... 40 DRAFT

Page 429 of 872 ends

SECTION A
SECTION A A Letter of Transmittal
DRAFT

Page 430 of 872 ends

Twining | City of Brentwood 1
A. LETTER OF TRANSMITTAL
April 10, 2025
Proposal No. 25-0520
City of Brentwood, Engineering Department
Attention: Vatsal Patel
150 City Park Way, Brentwood, CA 94513
RE: Statement of Qualifications to Provide Geotechnical/Construction Materials Testing Services for Infrastructure Projects Dear Vatsal,
The City of Brentwood (City) seeks qualified firms to provide geotechnical, construction materials testing, and related services for upcoming projects. Twining, Inc. (Twining) understands up to four firms will be selected for an initial one-year term, with the potential for two one-year extensions, and all services must comply with strict Caltrans testing requirements and City standards. Additionally, Twining brings the following value to this contract:

Taylor Latimer will serve as our Project Manager and single point-of-contact for the City: Twining has identified the City as a high priority agency, and as such, Taylor will prioritize the City's projects and be prepared for any requested support at a moment's notice.

Taylor will be supported by our large staff of in-house materials engineers, geotechnical engineers, civil engineers, geologists, multicarded inspectors, and ASNT Level III experts. Having this level of in-house experts on our team means we can be proactive with potential project challenges and provide possible solutions before they become issues. As a material testing and inspection firm, this makes Twining a one-stop shop for all of the City’s geotechnical engineering, special inspection and material testing needs.

Geotechnical Engineering and Materials Testing Expertise: Twining performs all of the necessary geotechnical testing in-house using local staff. All personnel proposed for use on this project are Twining employees that have longevity with Twining. Our engineers and project managers personally know each of our soil and lab technicians and we communicate with field and lab personnel regularly, including periodic in-house training sessions. Our engineers and project managers are intimate with the project details and are available on short notice when geotechnical issues arise in the field that demand immediate, hands-on attention. The proposed testing and inspection staff, along with their experience, qualifications, and lab location can be found beginning on page 5.

Familiarity with the Local Region and On-Call Contracts with Public Regions: Twining has decades of experience providing special inspection and materials testing on over 50 on-call contracts across California. Our extensive resource pool enables rapid response, including 24/7 dispatch support for after-hours needs. We have served numerous local agencies, including the Cities of Millbrae, Vallejo, Walnut Creek, Berkeley, San Bruno, San Ramon, and Marin County. Our familiarity with the local region’s soils and geotechnical conditions ensures efficient and reliable service.

State-of-the-Art Laboratories and Local Resources: Twining operates Caltrans TL-0113 certified laboratories in Concord and Sacramento, staffed by skilled technicians and engineers who follow strict QA/QC protocols. With over 35 multi-carded inspectors and materials technicians in the Brentwood area, our team is highly trained and holds numerous professional certifications. We meet the industry's most rigorous inspection and certification standards, with accreditations from agencies such as Caltrans, FAA, USACE, ACI, ICC, AASHTO, DSA, and CCRL, solidifying our reputation as a trusted geotechnical, materials testing, and inspection laboratory.

We want to thank you for inviting us to present our proposal. Lastly, Twining acknowledges receipt of Addendum No. 1, issued March 31, 2025. If you have any questions, please contact Director of Structures Business Development, Julie Thome, by phone at (510) 967-1323 or via email at [email protected].

Sincerely,
Twining, Inc.

Linas Vitkus, PE, GE
Project Executive/Principal-in-Charge
Authorized to Bind Firm
Taylor Latimer, PE
Project Manager
Single Point-of-Contact
5027 Commercial Circle, Suite G
Concord CA 94520
Tel 925.849.8186
Fax 562.426.6424
Julie Thome
Director of Structures Business Development
(Local Brentwood Resident)
DRAFT

Page 431 of 872 ends

SECTION B

SECTION B
DRAFT
B  Subcontractors

Page 432 of 872 ends

Twining | City of Brentwood 2
The following is a list of possible subcontractors providing services under this contract. We recognize and support the City’s commitment to equal opportunity for local, race-neutral, minority-, woman-owned, and disadvantaged business enterprises. Whenever possible, we actively consider and engage such firms to promote diversity and inclusion in our subcontracting efforts. We also understand that no substitutions will be permitted without the City's explicit written approval.

Taber Drilling
Address:
536 Galveston Street
West Sacramento,
CA 95691
Phone Number:
(916) 371-8234
Project Role:

Geotechnical
Drilling; and Cone
Penetration Testing
Pitcher Services,
LLC
Address:
218 Demeter Street,
East Palo Alto, CA
94303
Phone Number:
(650) 328-8910
Project Role:

Geotechnical
Drilling; and Cone
Penetration Testing
Baja Exploration
Address:
1915 Commercial
Street, Escondido,
CA 92029
Phone Number:
(760) 743-7678
Project Role:

Geotechnical Drilling
Middle Earth Geo
Testing
Address:
23575 Cabot
Boulevard, Unit 211,
Hayward, CA 94545
Phone Number:
(714) 633-5025
Project Role:

Cone Penetration
Testing
Belshire
Environmental
Services
Address:
25971 Towne Centre
Dr S, Foothill Ranch,
CA 92610
Phone Number:
(949) 460-5200
Project Role:

Soil Disposal
B. SUBCONTRACTORS
DRAFT

Page 433 of 872 ends

SECTION C
SECTION C C Submittal Approach
DRAFT

Page 434 of 872 ends

Twining | City of Brentwood 3

1. Firm Qualifications
Our History
Twining’s legacy dates back more than 127 years. What started as a family business in 1898 has evolved into one of California’s largest service providers of geotechnical engineering design, materials testing, and construction inspection services. Highly regarded by state and local agencies, developers, contractors, consultants, and industry for providing high-quality services that are reliable, timely, and compliant, Twining has been a central part of some of California’s most regionally significant construction projects. The expertise and capabilities of Twining in geotechnical and many civil engineering disciplines, including testing of asphalt, soils, glue laminated structural lumbar, anchor bolts/epoxied dowels, sprayapplied fire resistive materials, base plate grouting, structural steel, masonry, shotcrete, and post tension concrete and rebar, as well as other construction materials, complement our services.

Twining has developed a strong reputation by providing sound engineering, testing, and inspection services on every project we undertake. We earned this reputation knowing that the true measure of our performance rests in the satisfaction of our clients. We approach each project with the understanding that we are evaluated on the safety and durability of the structures and pavements we test and inspect.

We employ some of the industry’s most well-known construction experts, including asphalt and concrete experts who perform research as well as consult with regulatory agencies to shape the future of construction standard practices. Our geotechnical team leaders are licensed and highly qualified with experience in geotechnical design, analysis, and construction support. In addition to our engineers’ highly technical consulting services, we can also provide construction material testing and inspection services.

Our engineers offer routine training to our field technicians to continuously improve and reinforce their skills related to field testing.

Additionally, experienced inspectors and laboratory technicians can provide field observation and testing to provide immediate testing data to the City, thus allowing for efficient and accelerated progress of the schedule.

Office Locations
» Long Beach, CA (Headquarters)
» Concord, CA (Local Office)
» Sacramento, CA
» Ventura, CA
» Fountain Valley, CA
» Riverside, CA
» San Diego, CA
Professional Services
» Geotechnical Engineering
» Nondestructive Examination
» Materials Testing Laboratory
» Vibration Monitoring
» Stormwater Site Monitoring and SWPPP
» Forensic Evaluation of Existing Structures
» Applied Research and Materials
Engineering
» Concrete Technology & Concrete Insight
» Concrete for Pavements & Infrastructure
» Asphalt Pavement Engineering Design
» Construction Quality Assurance Programs
» Mobile Laboratories
» Roofing and Waterproofing Inspection
» Plan Review and Plant Inspection
» Building Material Evaluations &
Specialized Testing
» Petrographic Laboratory
Business Contact Information
Address: 5027 Commercial Circle, Suite G
Concord, CA 94520
Phone: (925) 849-8186
Contact: Julie Thome (Local Brentwood
Resident) | [email protected]
C. SUBMITTAL APPROACH
DRAFT

Page 435 of 872 ends

Twining | City of Brentwood 4
C. Submittal Approach
Organization Chart
We have provided details on staff availability, a project organizational chart, and our selected subconsultants for this project. Our team is structured to ensure efficient project execution, with key personnel overseeing their respective areas of expertise. Our in-house team will lead geotechnical engineering, construction materials testing, and special inspections, while our subconsultants will support specialized services as needed. We have selected Taylor Latimer, as the Project Manager and single point-of-contact for this contract. Resumes for key personnel and testing staff are provided in the Section F. Attachments. Additional resumes, including resumes for our subconsultant, may be provided upon request.

Project Manager /
Single Point-of-Contact
Assistant Project Manager
Taylor Latimer, PE
Jerry "JJ" Oliver
Project Executive
Linas Vitkus, PE, GE
Laboratory Manager
Christian Masse
Taber Drilling
Pitcher Services, LLC
Baja Exploration
Middle Earth Geo Testing
Belshire Environmental Services
Subconsultants
As-Needed Technical Experts
Paul Soltis, PE, GE
Principal Geotechnical Engineer
Adrian Moreno, PE
Senior Project Engineer
Liangcai He, PhD, PE, GE
Chief Geotechnical Engineer
Hossein Bahmyari, PhD Fellow,
PE, DGE, ASCE Fellow
Senior Geotechnical Engineer
Jon Browning, PG, CEG
Certified Engineering Geologist
Amir Ghavibazoo, PhD
Pavement Expert
Laboratory Technicians
Field Inspectors
Andrei Polischuk
Bryan Bogle
Chris Thomas
Elwin Schoeneck
Eric Sonny Fierro
Mike McVey
Tyler Etcheverria
Van Cuthbertson, Jr.

Supported by our staff of over 180
plus multi-disciplined inspectors
DRAFT
Key Personnel

Page 436 of 872 ends

Twining | City of Brentwood 5
C. Submittal Approach
Staff Availability
0% 20% 40% 60% 80% 100%
Project Team Level of Effort Total Availability, Including Peak Workload Taylor Latimer | Project Manager
Jerry "JJ" Oliver | Assistant PM
Linas Vitkus | Project Executive
Paul Soltis | Principal Geo. Engineer
Adrian Moreno | Senior Project Engineer
Liangcai He | Chief Geo. Engineer
Hossein Bahmyari | Sr. Geo. Engineer
Jon Browning | Certified Eng. Geologist
Amir Ghavibazoo | Pavement Expert
Field Inspectors
Christian Masse | Laboratory Manager
Subconsultants
80%
80%
75%
75%
75%
90%
80%
80%
40%
100%
100% As-Needed
100% As-Needed
Subconsultants
Twining will be leading and performing the majority of the work for this project, leveraging our in-house expertise in materials testing, special inspections, and quality assurance. Our team will oversee all critical aspects of field and laboratory testing to ensure compliance with project specifications and industry standards. Any additional specialized services required for the project will be provided by our trusted subconsultants, who have been carefully selected for their proven expertise and reliability.

Twining will manage and coordinate all work to maintain seamless communication, quality control, and efficiency throughout the project.

Our subconsultants have been carefully selected for their expertise, reliability, and proven track record in delivering highquality services. Each firm brings specialized knowledge that complements Twining’s core capabilities, ensuring comprehensive support for all project requirements. Working under Twining’s leadership, our trusted subconsultants will provide targeted technical services while maintaining the same high standards of excellence and efficiency that our clients expect. Twining understands that no substitutions will be permitted without the City's explicit written approval.

For this contract we have included the following subconsultants.

Details for each subconsultant have been provided on page 2. » Taber Drilling | Geotechnical Drilling; and Cone Penetration Testing
» Pitcher Services, LLC | Geotechnical Drilling; and Cone Penetration Testing
» Baja Exploration | Geotechnical Drilling
» Middle Earth Geo Testing | Cone Penetration Testing
» Belshire Environmental Service | Soil Disposal
Inspection Staff Location
Twining’s inspection staff for this project is strategically located in our Concord and Sacramento offices/laboratories, ensuring efficient mobilization to the project site. All material samples requiring laboratory analysis will be transported to our state-of-theart, Caltrans TL-0113-certified laboratories, where they will undergo rigorous testing in compliance with project specifications.

Due to the proximity of our laboratories to the City's project sites, travel time and mileage will not be billed to the City. Any necessary travel time or mileage, due to offsite inspections, will be billed in accordance with the terms outlined in the contract.

Hourly minimum rates will be applied as specified in the contract to ensure proper allocation of resources while maintaining cost efficiency. Twining is committed to providing timely and responsive service while optimizing project costs through effective scheduling and resource management.

DRAFT

Page 437 of 872 ends

Twining | City of Brentwood 6
C. Submittal Approach

2. Project Team
Our team includes seasoned experts in geotechnical engineering, materials testing, and special inspections. Key personnel summaries below highlight their experience, credentials, and leadership, with full resumes in Section F. Attachments - Resumes (Appendix).

Name | Project Role Brief Bios and Qualifications
Taylor Latimer, PE
Project Manager
Taylor brings over 13 years of experience conducting geotechnical investigations across the state. He has managed all aspects of investigations, including proposals, permitting, fieldwork, analysis, reporting, budgeting, and client relations.

Jerry "JJ" Oliver
Assistant Project
Manager
Jerry brings over 20 years of industry experience, specializing in concrete, soils, asphalt, and aggregate testing. He oversees laboratory and field services, ensures lab accreditations, reviews test results for accuracy, and manages technicians on projects ranging from bridges and roadways to dams and structures.

Paul Soltis, PE, GE
Principal
Geotechnical
Engineer
Paul brings over 33 years of geotechnical expertise, specializing in investigations and analysis for roads, bridges, highways, and major infrastructure projects across California. He provides technical oversight for Twining’s geotechnical work, supports project communication and decision-making, and brings extensive experience in managing multiple on-call contracts and design coordination.

Adrian Moreno, PE
Senior Project
Engineer
Adrian brings over 12 years of technical expertise in geotechnical engineering, supporting projects from design through construction. He has managed complex investigations and quality control programs, and is well-versed in client coordination, scheduling, budgeting, data review, and overall project management.

Liangcai He, PhD, PE,
GE | Chief Geotech.

Engineer
Dr. He brings over 33 years of expertise in geotechnical and earthquake engineering, specializing in soil-structure interaction, foundation design, slope stability, and seismic analysis. He leads investigations, analyses, and design efforts, ensuring structural integrity through expert recommendations and rigorous QA.

Hossein Bahmyari,
PhD Fellow, PE, DGE
Senior Geotechnical
Engineer
Dr. Bahmyari brings over 20 years of experience in geotechnical engineering, with expertise in tunnels, highways, dams, and levees. He will provide technical expertise, conduct geotechnical analyses, and ensure compliance with project specifications, contributing to the successful execution of the project.

Jon Browning,

PG, CEG
Certified Engineering
Geologist
Jon brings over 20 years of experience in engineering geology and environmental consulting, specializing in subsurface geotechnical exploration, fault trench and landslide investigations, and environmental geology. He will assess geological hazards, provide interpretations, and offer recommendations to support engineering projects, utilizing his extensive expertise in subsurface exploration and environmental investigations.

Amir Ghavibazoo,
PhD
Pavement Expert
Dr. Ghavibazoo brings over 11 years of experience and specializes in pavement and highway design, pavement evaluations, and engineering specifications. He will assess and design pavement structures, optimizing performance and implementing cost-effective maintenance strategies to ensure the longevity and functionality of roadways and infrastructure projects.

Andrei Polischuk
Field Inspector
Andrei has 13 years of experience performing construction inspections, sampling, and testing soils, concrete, asphalt, masonry, and reinforced and structural steel.

Bryan Bogle
Field Inspector
Bryan brings over 22 years of technical experience to Twining, with expertise in Caltrans, ASTM, and ACI test methods and procedures. He is well-versed in Caltrans construction practices, standards, and manuals.

Chris Thomas
Field Inspector
Chris brings over 32 years of experience and technical expertise to Twining. His experience encompasses all aspects of testing and inspection with special emphasis in concrete and concrete and soils.

Elwin Schoeneck
Slurry Seal Inspector
Elwin brings over eight years of experience as a registered inspector/apprentice. He is a multi-certified inspector with specialized experience in the testing and inspection of asphalt.

Eric "Sonny" Fierro
Slurry Seal Inspector
Sonny brings over five years of laboratory and field experience with concrete testing and holds multiple ACI certifications. His project work spans public infrastructure and private development projects.

Mike McVey
Slurry Seal Inspector
Michael brings over 46 years of inspection experience, specializing in soils and concrete inspections across various project types. He excels in reviewing plans, ensuring conformance to specifications, and conducting inspections in compliance with ICC and ACI standards.

Tyler Etcheverria
Field Inspector
Tyler brings two years of experience to Twining, specializing in soil, concrete, and quality control inspections. He is known for his diligence, attention to detail, and commitment to ensuring compliance with industry regulations, safety protocols, and project specifications.

Van Cuthbertson, Jr.

Field Inspector
Van has four years of experience, specializing in soils and concrete inspections, backfill, grading, and asphalt observation. He is a multi-carded inspector with ACI and ICC certifications, allowing him to perform various inspections during a single dispatch.

DRAFT

Page 438 of 872 ends

Twining | City of Brentwood 7
C. Submittal Approach

3. Project Experience
Twining maintains long-standing relationships with numerous California municipalities and public agencies, having contributed to over a thousand public works projects since 2008. Currently, we're listed on 50+ on-call lists statewide, poised to bring the insights gained from these experiences to the City's future projects. Below are some of our public agency clients. In on-call services, Twining excels, offering unmatched expertise in materials sampling and testing for various municipal clients statewide. We've tailored our project management approach to maximize efficiency for on-call, as-needed, and similar agreements, earning the trust of over 30 agencies in the NorCal region alone. Agencies in bold are highlighted on the following pages.

Northern California
» City of American Canyon
» City of Chico
» City of Citrus Heights
» City of Elk Grove
» City of Folsom
» City of Merced
» City of Millbrae
» City of Milpitas
» City of Modesto
» City of Monterey
» City of Pleasant Hill
» City of Rancho Cordova
» City of Roseville
» City of Sacramento
» City of Salinas
» City of San Bruno
» City of San Jose
» City of San Leandro
» City of San Ramon
» City of Stockton
» City of Tiburon
» City of Turlock
» City of Vallejo
» City of Walnut Creek
» County of Marin
» County of Monterey
» County of Placer
» County of Sacramento
» County of Salinas
» County of San Mateo
» County of Solano
» County of Yolo
» County of Yuba
» Town of Moraga
City of Roseville
On-Call Materials Testing Services
Over the last decade, Twining has been successfully providing the City of Roseville with as-needed material testing and construction support services. Additionally, each year the City’s Department of Public Works embarks on a schedule of maintaining the City’s streets. Under this on-call contract, Twining provides construction materials testing and geotechnical engineering services on vertical construction projects, which has included various infrastructure improvements.

Twining has also provided sampling and testing of hot mix asphalt, concrete, and micro-surfacing/slurry seal for the annual repaving program which was comprised of 16 center lane miles of roadway throughout the City.

Twining has successfully provided materials testing on multiple projects under this oncall contract, including:
» 2016 Roller Compacted Concrete
» 2020 Residential Resurfacing
» Chip Seal Project
» CIP Traffic Signal Project
» Curb, Ramp & Concrete Project
» Hillcrest Storm Drain Improvement
» Roadway and Trail Maintenance Service
» Westbrook Blvd & Payson-Octave Ave Improvements
» Woodcreek Oaks Widening
Project Team Involved
JJ Oliver
Linas Vitkus
Eric Sonny Fierro
Chris Thomas
Elwin Schoeneck
Mike McVey
Tyler Etcheverria
Paul Soltis
Design and Constructions
Budgets
Project costs differ by project
and range from $5K-$100K
Schedule of Completion
2015 - Ongoing
Client Reference
Gursewak Singh
Assistant Engineer
(916) 746-1305
DRAFT

Page 439 of 872 ends

Twining | City of Brentwood 8
City of Millbrae
On-Call Geotechnical Engineering and Materials Testing & Inspection Services
The City of Millbrae is on the road to becoming the most substantial regional and local transit hub in the Bay Area. Their economic and community development is being guided by safety and sustainability standards. Following the 2018 election season, the City will be investing roughly $6 million in rehabilitating its local infrastructure over the next few years. These improvements are especially critical, and maintenance of this resource is a top priority.

Twining was awarded a three year contract to provide all services and work required to review geotechnical reports, slope stability review, field materials testing, and laboratory materials testing. Task orders under this contract included both design and construction services for sanitary sewers, storm and water mains, roadways, grading, drainage, paving, and park and building facilities. Under our on-call contract, Twining has provided geotechnical engineering, material testing, and inspection services of the following projects:
» 2 Willow Avenue, Water Line Break
Geotechnical Investigation
» 2020 Larkspur Sanitary Sewer
Improvements
» Millbrae Recreation Center
» Street Rehabilitation Project
» Transit City Center to Spur Trail
Connection Gap Closure
City of Vallejo
On-Call Materials Testing & Inspection Services
Twining was selected to provide on-call materials testing services to the City of Vallejo on City infrastructure projects. Projects that have been assigned to Twining include pavement rehabilitations and streetscapes. Our team is fully capable of handling a broad range of project types. This on-call contract includes comprehensive materials testing and requires quick response times in order to ensure the City meets budget and schedule requirements. Twining’s large pool of local, experienced inspectors facilitates the necessary quick and straightforward process of fulfilling requests on short notice.

Twining has successfully delivered materials testing services for multiple projects under this ongoing on-call contract. All completed projects were finished on schedule and within budget:
» 17-18 Asphalt Overlay
» 5 Pedestrian Intersection Crossing
Enhancements
» Chase Street Improvement
» Curtola Parkway Bike Trail
» Florida-Carolina Street Pavement
Rehabilitation
» Downtown Streetscape Phase 3
» Rosewood Drive & Benicia Road
» Santa Clara Street Pavement
Rehabilitation
» Sereno Drive Rehabilitation
» Water Main Break Project
Project Team Involved
JJ Oliver
Linas Vitkus
Chris Thomas
Mike McVey
Van Cuthbertson, Jr.

Design and Constructions
Budgets
Project cost differ by project
and range from $5K-$200K
Schedule of Completion
2022 - 2024
Client Reference
Bill Giang, PE
Assistant Engineer
(650) 259-2325
Project Team Involved
JJ Oliver
Linas Vitkus
Chris Thomas
Elwin Schoeneck
Mike McVey
Design and Constructions
Budgets
Project costs differ by project
and range from $2K-$100K
Schedule of Completion
2015 - Ongoing
Client Reference
Sam Kumar, Sr. Civil Engineer
(707) 648-5229
C. Submittal Approach
DRAFT

Page 440 of 872 ends

Twining | City of Brentwood 9
City of Sacramento
On-Call Materials Testing & Special Inspection Services Over the past nine years, Twining has been successfully providing the City of Sacramento with on-call quality assurance testing and observation services for various capital improvement projects throughout the City. Twining has performed quality assurance testing on numerous construction projects for the City of Sacramento under our ongoing service contract.

Under this on-call contract, Twining provides construction materials quality assurance testing and observation services on both horizontal and vertical construction projects.

The project work has included roadways, bridges, underground utilities including sewers and water transmission mains, building structures, and parking lots. Our Sacramento laboratory performs testing of soils, aggregates, cement, concrete, masonry, grout, and hot mix asphalt. QA/QC field testing and inspection of common materials includes soil/aggregate, concrete/masonry, asphalt concrete and special inspection of welding, and structural steel. Twining has successfully provided materials testing on multiple projects under this on-call contract, including:
» Community Center Theater
» E.A. Fairbairn Water Treatment Plant
Backwash Tank
» Florin Pump Station Improvements
» Fruitridge Drain Replacement
» Memorial Auditorium
» South Sacramento Parkway Trail
Contra Costa Transportation
Authority
Mokelumne Bicycle and Pedestrian Overcrossing Project
The Mokelumne Trail Bicycle and Pedestrian Overcrossing is an 850-foot-long bridge spanning Highway 4 in Brentwood, reconnecting trail segments separated by the highway’s expansion. The bridge features a 16-foot-wide pathway, designed to accommodate both cyclists and pedestrians while complying with ADA standards.

Built with a multi-span design and a central support column in the highway median, the bridge sits on earthen embankment approaches. Its width also allows for potential future autonomous shuttle travel. Completed in March 2024 at a cost of approximately $13 million, the project was funded through Measure J taxpayer dollars, the State Route 4 Bypass Authority, and Bay Area Toll Authority bridge toll funds.

Twining provided comprehensive materials testing and inspection services to ensure the bridge’s safety, durability, and performance. During pre-construction, Twining collaborated with the project team on submittal reviews, pre-construction meetings, and planning. Throughout construction, inspectors oversaw earthwork, asphalt, and concrete operations, conducting field density testing, verifying compaction, and analyzing material samples in the laboratory. Through thorough QA documentation and coordination, Twining supported the successful delivery of this vital infrastructure, enhancing safe and efficient connectivity for cyclists and pedestrians.

Project Team Involved
JJ Oliver
Linas Vitkus
Elwin Schoeneck
Van Cuthbertson, Jr.

Design and Constructions
Budgets
Project costs differ by project
and range from $10K-$150K
Schedule of Completion
2014 - Ongoing
Client Reference
Josh Werner
Assistant Engineer
(206) 227-1545
Project Team Involved
JJ Oliver
Andrei Polischuk
Bryan Bogle
Chris Thomas
Mike McVey
Tyler Etcheverria
Van Cuthbertson, Jr.

Amir Ghavibazoo
Design and Constructions
Budgets
$228,043.55
Schedule of Completion
2021-2023
Client Reference
Tim Haile, Executive Director
(909) 518-7057
C. Submittal Approach
DRAFT

Page 441 of 872 ends

Twining | City of Brentwood 10
C. Submittal Approach

4. Project Approach

4.a. Overall Project Approach
The following is our approach for managing materials testing tasks in support of projects under the City’s on-call contract:

Overcoming On-Call Contract Challenges. Twining’s personnel depth of over 180 inspectors, allows us to ensure that the City’s project will have highly trained and appropriately certified inspection personnel. Twining consistently supplies multi-certified, qualified inspectors with extensive experience to each project, providing efficiency and effective performance, while conducting multiple inspections in compliance with regulations. We recognize the importance of efficiency and the sensitivity of budgets. Hence, we maintain rigorous budget reporting and tracking that enables clients the ability to track their budget daily and weekly. Additionally, reports are published to an online document storage site called ConstructionHive. All project reports are accessible to the City even after the project has been archived. The system also allows Twining to track the hours worked, non-compliant items, clearing of non-compliant items, and more.

Permitting Challenges. For over five decades, Twining has been well-versed in applying for and obtaining all necessary permitting to complete geotechnical field investigations. We understand, that for projects under this contract, wells and soil borings within the County of Contra Costa will require permits from Environmental Health. We are familiar with the County's Land Use Program that issues permits for wells and soil borings and will conduct necessary inspections during drilling. Twining will handle all permitting efforts in-house including projects that includes work impacting the public right-of-way (ROW), requiring an Encroachment Permit from the City.

Your Project
Manager, Taylor
Latimer, will review
the available plans
and
specifications for
the project.
1 The project
technician/
inspector performs
the appropriate
testing or inspection, and logs location of each test or item inspected.

When required,
samples are
obtained from
construction
materials for
further lab testing.
3 If a material type
(e.g. ready-mixed
concrete) requires
plant inspection,
both the plant and
field technicians
will communicate
directly with the
Project Manager
regarding batched
quantities, time
of shipment, total
yards at the plant,
plant break downs,
and all pertinent
daily activities.
5 Upon dispatch
request from City
representative,
the appropriate
inspector with the
required certifications is assigned
to the project.

These technicians
and inspectors are
available within
24 hours of this
request and often
can be provided
with even less prior
notification.
2 The technician/
inspector logs
their daily testing,
inspection, and
sampling and
provides a copy of
their daily report to
the City's
representative for
their signature.

The daily report
also contains a
log of their hours
covering the duties
performed that day.
4 Daily field and
shop reports are
reviewed by the
Taylor, along with
all laboratory test
results, and
distributed
weekly to the
project team. A log
of all tests and inspections is kept by
Taylor, which also
includes tracking
and resolution of
any noncompliant items.
6 We will prepare a final construction QA
report to document
the results of all
required testing and
recommendations.

This report will be
available for review
and comment by
City staff within
seven business
days from the completion of site work.

The final report will
be submitted to
the City within five
business days.
7 4.b. Scope of Work
Scope of Geotechnical Analysis Deliverables Expected Time of Completion
3a. Geotechnical Field Investigation – Review
Background Information & Site Reconnaissance:
» Mark locations of planned subsurface explorations
» Obtain any necessary permits
» Proposed Exploration Location Plan will be provided for approval
» USA ticket
» Applicable permits
Mobilize upon NTP
USA - 72-hour notice
Permit turnaround time is
5 to 10 days.
3a. Geotechnical Field Investigation – Coordinate &
Perform Field Explorations:
» Soil borings and/or Cone Penetration Tests (CPTs).
» Twining engineer will log subsurface conditions
» Drive samples using a California Modified sampler
or Standard Penetration Test (SPT)
» Bulk samples obtained from all explorations.
» Samples transported to laboratory
» Seismic shear wave measurements (optional)
» Explorations will be backfilled
N/A Field explorations may
commence immediately
upon receipt of approved
permits. Typical
investigations span 1 to
5 days.

DRAFT

Page 442 of 872 ends

Twining | City of Brentwood 11
C. Submittal Approach
Scope of Geotechnical Analysis Deliverables Expected Time of Completion
3b. Geotechnical Investigation Report – Perform
Geotechnical Lab Testing (see attached rate schedule
for full list of available testing)
Laboratory Test Reports may be transmitted in advance of Final Report, otherwise results will be incorporated into Geotechnical Report
A comprehensive suite
of testing is typically
completed within 2 weeks
of the completion of field
sampling. Individual tests
may be completed sooner,
as required.
3b/3c. Geotechnical Investigation Report – Conduct
Engineering Analysis: Results of or field and lab tests evaluated and engineering analyses performed to
provide geotechnical recommendations for design
and construction.

Technical Memorandums: As project needs dictate, specific analyses may be completed and communicated with the project team on an expedited basis through Technical Memorandums.

Engineering analyses
are typically completed
in parallel with the
Geotechnical Report –
within 4-8 weeks from
completion of field work
3b/3d. Geotechnical Investigation Report – Prepare
Geotechnical Report:
» We will prepare a report to summarize the data
collected and present our findings, conclusions,
and geotechnical recommendations for design and
construction of the proposed project. The reports
will be provided signed and stamped by a licensed
California Geotechnical Engineer.

Geotechnical Investigation Report:
» Site Maps and boring logs
» Soil classification in accordance with USCS; summary of field and lab test procedures & data, geologic and seismic conditions and groundwater conditions
» Recommendations for appropriate mitigation measures
of hazards and expansive soil conditions, if necessary, seismic parameters for use in seismic design, site prep and excavation, placement of compacted fill, import fill, site drainage, and trenching, foundation systems, settlement estimates, lateral pressures and resistances, concrete
flatwork/slab-on-grade including subgrade preparation and modulus of subgrade reaction, pavement structural sections.

We will typically submit
the geotechnical report
within 4-8 weeks from
completion of the field
work, depending on
the complexity of the
investigation and/or
project.
3d/3e. Geotechnical Engineer of Record – PostReport Consultation: Meeting with City and stakeholders (e.g., the project civil and structural
engineers) to review all geotechnical engineering
related specs, to help make it possible to save costs
and achieve cost-effective design and construction.

Technical Memorandums; Review Letters Technical Memos will be transmitted within
48-hours of the meeting
or review that warrants a
Memo.
3e. Geotechnical Engineer of Record – Construction
Oversight: As-needed geotechnical and geological
engineering support during construction. The GEOR
will provide plan and specification review, immediate
responses to Requests for Information (RFI) and
deferred design submittals. Project engineer performs
periodic observations on an as-needed basis, to check
for conformance with geotechnical recommendations.

Technical Field Memorandums; RFI and Submittal Responses.

We will provide a Technical Memo for each site visit that will summarize our findings and recommendations based on the conditions observed.

Field Memos will be
transmitted within
24-hours of the site visit.

Scope of Construction Material Testing & Inspections Deliverables Expected Time of Completion 4a. Concrete – Field Testing: ACI and ICC certified inspectors will perform all required field sampling and testing activities associated with concrete pours.

Daily Field Report (DFR) summarizing
activities; Field Concrete (FC) test
report summarizing test results and
mix data.

DFRs will be submitted onsite
day-of inspection, as required. DFR
distributed via fileshare website to all
the relevant personnel within 24-hours
of inspection completion.
4a. Concrete – Laboratory Testing:
» Compressive strength
» Shrinkage testing
Concrete Test Report (CTR)
summarizing test results and design
requirements
As required by project documents
(e.g., 7-day, 28-day). Reports issued
day of testing.
4b. Soil Compaction – Laboratory Testing:
» Moisture-density curves (ASTM or CT)
Soil Test Report summarizing test
results and sample descriptions,
including soil type and sample location.
24 to 48-hours
DRAFT

Page 443 of 872 ends

Twining | City of Brentwood 12
C. Submittal Approach
Scope of Construction Material Testing & Inspections Deliverables Expected Time of Completion 4b. Soil Compaction – Field Compaction Testing: Our certified and experienced technicians will provide compaction observations and field density testing during the placement of engineered fill using nuclear gauge
DFR summarizing activities; Nuclear
Density (ND) test report summarizing
test results and proctor .

NDs along with DFRs will be submitted
onsite day-of inspection, as required
and distributed via fileshare website
to all the relevant personnel within
24-hours of inspection completion.
4b. Soil Compaction – Soils Mechanics Laboratory Testing:
» Sieve analysis
» Specific gravity
» Plasticity index
» Sand equivalent
» Durability index
» R-Value
» Minimum resistivity
» California impact
» Organic content
See Rate Schedule for a comprehensive list of available tests.

Soil Test Report summarizing test
results and sample descriptions,
including soil type and sample location.
24 to 48-hours
4c. Aggregate Testing – Laboratory Testing:
» Grading sieve analysis
» Organic impurities
» Unit weight
» Sand equivalent tests
» Specific gravity and
absorption
» Cleanness value
» Moisture content
determination
» Potential reactivity of
aggregates and crushed
particles
See Rate Schedule for a comprehensive list of available tests.

Aggregate Test Report summarizing
test results and sample locations.
24 to 48-hours
4c. Aggregate Testing – Field Compaction Testing: Our certified and experienced technicians will provide compaction observations and field density testing during the placement of aggregate base using nuclear gauge method.

DFR summarizing activities; Nuclear
Density (ND) test report summarizing
test results and proctor .

NDs along with DFRs will be submitted
onsite day-of inspection, as required
and distributed via fileshare website
to all the relevant personnel within
24-hours of inspection completion.
4d. Asphaltic Concrete – Laboratory Testing:
» California impact
» Stabilizer value
» Swell test of bituminous
mixture
» Bitumen content of paving
mixture
» Moisture vapor susceptibility
» Gradation of extracted
sample
» Maximum density
» Open graded mix evaluation
» Type A/ Type B mix
evaluation
» Moisture content of AC
See Rate Schedule for a comprehensive list of available tests.

Asphalt Concrete Test Report
summarizing test results and sample
locations.
24 to 48-hours
4d. Asphaltic Concrete – Field and Batch Plant Inspection and Testing: Our certified and experienced technicians will inspect the placement and compaction of asphalt, including temperature, lift thickness, compaction effort and provide field density testing during the placement using nuclear gauge method. Batch plant inspection ensures mix design is properly implemented.

DFR summarizing activities; Asphalt
Nuclear Density (ND) test report
summarizing test results and Rice
Density/Hveem Density determined by
the lab.

NDs along with DFRs will be submitted
onsite day-of inspection, as required
and distributed via fileshare website
to all the relevant personnel within
24-hours of inspection completion.
4d. Asphaltic Concrete – Existing Pavement Analysis: Our certified and experienced technicians will perform pavement cores, and if necessary, excavation of subgrade soil and aggregate base to evaluate existing pavement sections.

Asphalt Concrete Test Report
summarizing test results and sample
locations.
3-5 days
4e. Slurry Seal – Laboratory Testing: Slurry seal testing per Caltrans requirements. For a comprehensive list of available tests, see Fee Schedule.

Asphalt Concrete Test Report
summarizing test results and sample
locations.
48 to 72-hours
4e. Slurry Seal – Field Inspection: Our certified and experienced inspectors will inspect the placement of slurry seal, including spread rates. See Mike McVey, Elwin Schoeneck and Eric Sonny Fierro for inspectors available for this task.

DFR summarizing activities DFRs will be submitted onsite day-of inspection, as required and distributed
via fileshare website to all the
relevant personnel within 24-hours of
inspection completion.
4f. Optional Materials Testing: Our certified laboratories will complete all necessary testing per project requirements. For a comprehensive list of available tests, see Fee Schedule Test Report summarizing test results
and sample locations.

Typical 24 to 48-hours
DRAFT

Page 444 of 872 ends

Twining | City of Brentwood 13
C. Submittal Approach

5. Quality of Work
Digital Reporting
With ConstructionHiveTM our clients gain instant access to new reports and are able to easily search for and
locate all previous reports. We utilize ConstructionHive, an innovative cloud based platform that provides a
streamlined distribution process. ConstructionHive
allows us to share field testing and inspection data,
laboratory test reports, and other documents and data
with the project team. Additionally, our inspectors
utilize a paperless reporting system accessible on their smartphones or tablets in the field, which allows for rapid report turnaround. This also helps remove the potential for human error, omitting the possibility for lost reports or missing/incorrect project numbers.

Our Project Manager will review reports prior to submitting via the automated system. With electronic reporting,
we are able to provide our inspection and laboratory
reports within the same day, essentially in real time. With paperless reporting, when an inspector completes his
report, the file is automatically submitted to the Project Manager for review. A process that used to take days
is now completed in minutes. The field reports can be
reviewed in near real time to ensure they are accurate and complete. With ConstructionHive, the possibility for human error has been minimized, ensuring timely and accurate
testing and inspection reporting and documentation.

Client Name - Your Project
Client Name
Your Project
John Doe
Twining has made a document for your
project available to you on Construction
Hive TM. You can click the link below to
directly access it.

With ConstructionHive, our clients gain instant
access to new reports and are able to easily
search for and locate all previous reports.

ConstructionHive is a cloud based platform providing
applications for the distribution and analysis of
information amongst construction industry participants
(such as construction companies, construction
material producers, testing consultant laboratories and government agencies). It provides a centralized repository of documents and data (testing and inspection) that is
available for analytical reporting and integration.

It has been successfully used for large (>$1B)
infrastructure projects in the USA and Australia by leading private and public corporations, and currently has millions of documents under storage and more than 10,000
registered users.

Geotechnical Design Reports
We will submit a Geotechnical Investigation Report,
conforming to requirements of CBC, county, and any
other applicable jurisdictions that will include a summary of our scope of work, our project understanding, an
assessment of Geologic Hazards, our conclusions, and
our recommendations regarding geotechnical aspects
of the project. We will include applicable information as appendices, such as figures illustrating locations of site work, site geology, etc.; logs of subsurface explorations; and laboratory test results.

Geotechnical Construction Testing and
Observation Reports
During Construction Observation and Testing: Daily field reports will be submitted each day to all the relevant
personnel. In addition, a daily compaction test report will be included when applicable. Laboratory test results will be reported when completed throughout construction.

At the completion of earthwork construction, we will
prepare an as-built geotechnical engineering report that will summarize our observations and test results into one complete package.

We have provided sample reports in Section F.

Attachments - Exhibits and/or Other Documentation
beginning on page 40. For more sample work, please click the following link or use the QR code provided:

Sample Geotechnical Investigation Report
DRAFT

Page 445 of 872 ends

Twining | City of Brentwood 14
C. Submittal Approach
Approach to Managing QC and Quick Schedules
Our approach to managing and maintaining quality control for projects or on-call agreements with fast turnaround schedules prioritizes efficiency without compromising
quality. Firstly, we establish clear communication channels with clients to understand their specific requirements
and time constraints, if any. Then, we streamline our
processes, utilizing advanced technology and experienced personnel to expedite tasks while adhering to rigorous
quality standards. Regular monitoring and feedback
mechanisms ensure that any issues are promptly
addressed, maintaining the integrity of our deliverables.

We understand that construction projects, specifically for on-call contracts, often demand after-hours support. Our dispatching office offers 24-hour, 7-day per week service.

We can provide inspectors for your project anytime,
ensuring your project can continue without interruption.

If rush testing or non-normal business hours are needed, we are prepared to provide testing even on short notice.

Twining’s dispatch will respond to emails within one hour and can have an inspector on-site with the short notice within 3-4 hours. Twining typically requests a minimum of 24-hour notice for inspection requests to ensure proper coverage for the jobsite.

Turnaround Time
Our turnaround time for non-rush test results is within 72 hours of receiving samples at the laboratory. Rush
samples can be expedited within 24 hours, depending
on the duration of the test. With a fully certified lab staff working staggered hours, our test result turnaround times are usually within 48-72 hours. We are committed to
supporting any of your expedited construction schedules and milestones. Our inspectors maintain continuous, direct communication with the Project Manager and Laboratory
Manager.

We have found that assigning a single point-of-contact
to our clients is the most effective approach for ensuring seamless customer service throughout the contract.

This individual is responsible for providing feedback to all client requests, fulfilling project requirements, and providing technical assistance with the support of our
extensive roster of technical experts at Twining. This
project management approach facilitates consistent
communication with the City's team and a consensus
among stakeholders, promoting familiarity with their
processes and procedures. Our Project Manager,
Taylor, will actively engage with general contractors
and/or the City's field staff to understand and meet
the project's daily staffing needs. Twining's technical team comprises experts in various fields, including
geotechnical engineering, special inspection, nondestructive testing, specialty testing such as load testing, roofing and waterproofing consultation and inspection,
asphalt pavement inspection, and laboratory testing of
construction materials.

Project Management Approach
Successfully supporting an on-call contract requires
flexibility and a depth of resources—qualities Twining
offers in abundance. We are well-equipped to respond
to urgent requests, often providing “same day” services thanks to our large pool of qualified, local inspectors and engineers, as well as a dispatch team experienced in
coordinating multiple projects simultaneously.

Single Point-of-Contact: As Twining’s designated point
of contact, Taylor will oversee all services provided to the City. He will be familiar with each task order and will work closely with the assigned project manager—often himself— to ensure project needs are met and the City is satisfied with our performance.

Taylor will review all invoices and reports for accuracy and timeliness prior to submission. He will remain
accessible to project team members for questions or
recommendations, monitor budget status, and collaborate with the team to control costs and maintain efficiency. In the event of budget deviations, he will promptly notify the City and help allocate costs to their appropriate sources.

This hands-on project management approach ensures
strong coordination with the City, structural and civil engineers, and contractors. Our shared goal is a successful project—delivered on time and within budget.

DRAFT

Page 446 of 872 ends

SECTION D
SECTION D D Agreement Provisions
DRAFT

Page 447 of 872 ends

Twining | City of Brentwood 15
Statement
We acknowledge receipt and review of the City’s standard agreement, provided as Attachment B – Sample Professional Services Agreement. We understand that by submitting this proposal, we agree to enter into the agreement using the attached form without exceptions.

D. AGREEMENT PROVISIONS
DRAFT

Page 448 of 872 ends

SECTION E
SECTION E E Conflict of Interest
DRAFT

Page 449 of 872 ends

Twining | City of Brentwood 16
Statement
We have reviewed the requirements regarding potential conflicts of interest. At this time, we do not have any actual or perceived conflicts related to this work. Should any arise, we will promptly disclose them to the City for review and resolution.

E. CONFLICT OF INTEREST
DRAFT

Page 450 of 872 ends

SECTION F
SECTION F F Attachments
DRAFT

Page 451 of 872 ends

Twining | City of Brentwood 17

RESUMES
City of San Marcos, Bent Avenue Bridge
Taylor provided the geotechnical investigation for the proposed bridge which will cross San Marcos Creek. The site is bordered by existing residential subdivisions to the south, and existing commercial developments to the north. The areas both east and west of the site are primarily undeveloped.

Poinsettia Lanes Bridges
Taylor provided the geotechnical investigation and managed the construction testing and inspections for soils and materials for the two new Poinsettia Lane Bridges within the Treviso subdivision. The investigation included hollow stem borings at the bridge support locations, laboratory testing and geotechnical analyses; the construction inspections included excavations for spread footings to support the bent columns and cast-on-drilled-hole (CIDH) piles to support the abutment foundations, and oversight of the material sampling and testing for the entire bridge construction.

California State Route 178 (SR-178) Widening Project
Taylor worked with traffic control and hollow-stem drill rig to sample soils and measure existing pavement sections along the SR-178. This work included logging soil borings and collecting soil samples.

FY19 Military Construction (MCON) Project P-224, Naval Weapon Station (NAVWPNSTA) Seal Beach Ammunition Wharf and Turning Basin Technical Study Taylor coordinated with base security to obtain clearances for himself and subconsultants, cleared borings of possible utility conflicts, scheduled and supervised mud rotary drill rigs and CPT rigs, logged soil borings, and collected soil samples for both a feasibility geotechnical investigation report and a design level geotechnical investigation report for a new ammunition wharf (1,090-foot long by 125-foot wide) with associated turning basin, breakwater, boat channel and causeway. Prepared boring logs and geologic cross sections based on the findings of the field investigation.

Relevant Experience
Years of Experience
13 Education
MS, Structural Engineering,
University of California,
San Diego
BS, Structural Engineering,
University of California,
San Diego
Current Registrations/
Certifications/Specialized
Training
Professional Engineer (PE),
CA, No. 82035
Professional Organizations
Member of American Society
of Civil Engineers (ASCE)
Taylor Latimer brings over 13 years of experience in the construction industry performing geotechnical investigations in the Southern and Northern California markets, working on projects valued at up to $400M. He has been responsible for managing geotechnical investigations, which include but are not limited to writing proposals, developing plans, obtaining various permits and site clearances, conducting field investigations, analyzing field and lab test results, developing recommendations, writing reports, managing budgets and invoices, and maintaining client relations.

Professional Summary
Resumes
Taylor Latimer, PE
Project Manager
F. ATTACHMENTS
DRAFT

Page 452 of 872 ends

Twining | City of Brentwood 18
Caltrans, Marin County/Novato – Route 101
This project consisted of asphalt overlay from 0.1 miles south of Franklin Avenue Overhead to 0.5 miles south of San Antonio Creek Bridge. Twining’s work consisted of quality control for Dutra Group. Twining provided quality control lab testing of source material. JJ provided lab expertise and project management services for this project.

Caltrans District 4, CT 04-264094 San Antonio Creek, Sonoma/Marin Counties The project realigned Highway 101 and constructed a bridge better withstand a future seismic event over the San Antonio Creek in Marin and Sonoma Counties. JJ served as a technician.

El Dorado County Department of Transportation/City of Placerville, Wester Placerville Alignment Project
The City of Placerville widened and improved segments of Forni Road, Fair Lane, Placerville Drive and Ray Lawyer Drive. The improvements included modifications to eastbound and westbound U.S. Highway 50 (U.S. 50) ramps to and from Forni Road, Placerville Drive, and Ray Lawyer Drive. Twining provided materials testing and inspection. JJ provided inspection services for asphalt, soils, and concrete placements.

City of Sacramento, Florin Pump Station Improvements
The project involves a series of improvements to the existing Florin Pump Station in the City of Sacramento, including the installation of two 30-inch mag-meters, pressure transmitters, electrical improvements, and structural modifications. Twining is providing materials testing and inspection services. Jerry serves as Project Manager.

City of Sacramento, Groundwater Flush to Waste Improvement Project This project involves the rehabilitation and upgrade of twenty existing water wells currently providing service to the City. Improvements include demolition, piping changes, wellhead rotations, water and sewer modifications, electrical system upgrades, PLC control upgrades, the installation of new instrumentation systems, surface and flatwork improvements, and equipment addictions. Twining is providing quality assurance and quality control materials testing and inspection services. Jerry serves as Project Manager.

Relevant Experience
Years of Experience
20 Jerry Oliver brings over seven years of experience to Twining and over 20 years of experience in the industry. His experience encompasses concrete, soils, asphalt, and aggregate testing. Jerry has extensive knowledge of asphalt and Superpave testing. He is proficient in aggregate testing and holds an extensive number of certifications. In addition to coordinating laboratory and field services and maintaining lab accreditations, Jerry reviews all test results for accuracy and completeness prior to publication and manages all laboratory/ field technicians. Jerry has worked on various project types, including bridges, roadways, dams, and various structures.

Professional Summary
Jerry "JJ" Oliver
Assistant Project Manager
F. Attachments
DRAFT

Page 453 of 872 ends

Twining | City of Brentwood 19
City of Millbrae, On-Call Geotechnical Engineering and Material Testing Services Twining recently completed a three-year contract to provide all services and work required to review geotechnical reports, slope stability review, field materials testing, and laboratory materials testing. Task orders under this contract included both design and construction services for sanitary sewers, storm and water mains, roadways, grading, drainage, paving, and park and building facilities. Paul served as the Geotechnical Engineer of Record for this contract.

City of Long Beach, Shoemaker Bridge Replacement
Shoemaker Bridge is an extension of Shoreline Drive in Long Beach that traverses the Los Angeles River. Paul is serving as Geotechnical Engineer of Record during the design of the bridge. The scope of work includes drilling several deep borings and cone penetration tests (CPT), up to 200 feet deep, in the river using an amphibious carrier with drill rig and CPT device. Samples and information from the borings and CPT’s will be used to develop deep foundation recommendations for support of abutments and the bridge span over the river. Additional borings and CPT’s on the land side are additional scope of work that will be performed to develop geotechnical recommendations for retaining walls and new pavements.

City of Simi Valley, Cochran Street Bridge Widening
Paul provided Senior Geotechnical Engineering oversight during the design of the bridge widening at the Llajas Creek overcrossing. Twining provided geotechnical field investigation in support of the design of bridge foundations consisting of cast-indrilled-hole (CIDH) piles. The work was performed for the City of Simi Valley utilizing Caltrans design and construction standards. The investigation was performed in limited access conditions with the presence of active traffic and required coordination with the County of Ventura Flood Control District. Paul served as the Geotechnical Engineer of Record for the project.

Years of Experience
33 Education
MS, Geotechnical Engineering,
University of Colorado
BS, Civil Engineering,
California Polytechnic State
University, San Luis Obispo
Current Registrations/
Certifications/Specialized
Training
Professional Engineer,
CA, No. 56140
Geotechnical Engineer,
CA, No. 2606
Relevant Experience
Paul Soltis, PE, GE, brings more than 33 years of technical expertise to Twining. His experience includes geotechnical investigations and analyses relative to roads, bridges, highways, and other California infrastructure projects. His focus is on interaction with the design team during development of construction documents to achieve the most appropriate foundation type and most efficient site preparation techniques. Paul has extensive on-call contract management experience and the proven ability to simultaneously maintain and manage multiple projects. Paul is responsible for the technical oversight of the firm’s geotechnical projects and management of the firm’s geotechnical personnel. For the duration of this contract, Paul will assist Taylor in facilitating effective communication and decision-making throughout the project/task order lifecycle.

Professional Summary
Paul Soltis, PE, GE
Principal Geotechnical Engineer
F. Attachments
DRAFT

Page 454 of 872 ends

Twining | City of Brentwood 20
County of Placer, Walerga Road Bridge Replacement
The Placer County Department of Public Works is replacing the existing bridge on Walerga Road over Dry Creek, approximately three miles west of the City of Roseville between Baseline Road and PFE Road. The new bridge will be approximately 101 feet wide and 514 feet long, accommodating four 12-foot wide lanes, two 4-foot wide shoulders, a variable width median, a 12-foot wide Class 1 Bikeway, and an 8-foot wide walkway. Both the bikeway and walkway will be separated from traffic by concrete barriers on each side to maximize safety for pedestrians and bicyclists. Twining provided quality control materials testing and inspection services on the project. Adrian provided project engineering, overseeing testing and inspections.

City of Colton, I-10/Rancho Avenue Eastbound On-ramp Widening Project This project consisted of evaluating the subsurface conditions at the site and providing recommendations for widening the existing on-ramp and constructing a new retaining wall. Twining developed a subsurface exploration program, laboratory testing, and engineering analysis for the completion of the design, construction documents, and permit applications. The final Geotechnical Design and Foundation Report included an evaluation of the effects of slope erosion, periodic land movements during major storm, and seismic events, as well as relevant soil data, seismic parameters and foundation recommendations for bridge design. As the Project Engineer, Adrian took on site soil samples, made observations, and assisted in the preparation of the geotechnical recommendations report
City of Long Beach, Shoemaker Bridge Replacement
Shoemaker Bridge is an extension of Shoreline Drive in Long Beach that traverses the Los Angeles River. Adrian is serving as a staff engineer during the design of the bridge and performs sampling and analysis and prepares reports. The scope of work includes drilling several deep borings and cone penetration tests (CPT), up to 200 feet deep, in the river using an amphibious carrier with drill rig and CPT device.

Samples and information from the borings and CPTs will be used to develop deep foundation recommendations for support of abutments and the bridge span over the river. Additional borings and CPTs on the land side will be performed to develop geotechnical recommendations for retaining walls and new pavements.

Years of Experience
12 Education
BS, Civil Engineering,
California State Polytechnic
University, Pomona
Current Registrations/
Certifications/Specialized
Training
Professional Engineer,
CA, No. 87057
Relevant Experience
Adrian Moreno, PE, brings over 12 years of technical expertise to Twining. He excels at geotechnical engineering functions at any project stage, from the management of subsurface investigations, laboratory testing programs, and the preparation of geotechnical and foundation recommendation reports during the design phase, to the management of quality control testing and inspection programs during the construction phase of projects. Adrian has managed several complex projects, from initial authorization to completion, and is familiar with all aspects of project management, including client interaction, work scheduling reviewing of field and laboratory data, establishing and monitoring project budget, invoicing, and quality control.

Professional Summary
Adrian Moreno, PE
Project Engineer
F. Attachments
DRAFT

Page 455 of 872 ends

Twining | City of Brentwood 21
United States Army Corps of Engineers, P-159 Operations Access Points, Red Beach - Camp Pendleton
This 2018 joint United States Army Corps of Engineers, Caltrans, and North County Transit District project at Marine Corps Base Camp Pendleton, consisted of the widening and remediation of an existing roadway that provides access to Red Beach.

An existing railroad bridge was demolished and replaced with a two-span steel girder bridge. The project also added new retaining walls, associated site work, drainage, and shoring. Twining’s scope of services on this federally funded project includes providing geotechnical soils testing and quality assurance services. Liangcai served as the Chief Geotechnical Engineer.

City of San Diego, 15GT22 Sewer Group 843
The project consisted of the installation of new sewer mains in San Diego’s Logan Heights neighborhood. Twining is performing the geotechnical investigation of the proposed construction area to obtain information regarding the existing subsurface condition and to evaluate the feasibility of trenchless installation method and other alternative construction methods. Liangcai served as the Chief Geotechnical Engineer.

City of Simi Valley, On-Call Professional Pavement Engineering & Other Services Twining has provided pavement engineering, material testing, and inspection services in connection with the design and construction of public works projects for the City of Simi Valley. Under our on-call, Twining has provided surface and subsurface soil investigation, testing, evaluation, geotechnical inspection, and material testing and inspection of conventional and rubberized asphalt concrete pavement. We have also provided subgrade testing for any unusual characteristics, street structural section evaluations including pavement deflection testing, analysis and recommendation, and laboratory services including data collection, asphalt concrete batch plant inspection, preparation, and submission of engineering reports consisting of test results, with interpretation analysis, and recommendations. Liangcai served as Chief Geotechnical Engineer for this contract.

Years of Experience
33 Education
PhD, Structural Engineering
with an emphasis in
Geotechnical Engineering,
University of California,
San Diego
MS, Civil and Structural
Engineering with an emphasis
in Geotechnical Engineering,
Nanyang Technological
University, Singapore
BS, Hydraulic and Hydropower
Engineering, Tsinghua
University, China
Current Registrations/
Certifications
Professional Engineer,
CA, No. 73280
Registered Geotechnical
Engineer, CA, No. 3033
Professional Affiliations
American Society of Civil
Engineers (ASCE)
Relevant Experience
Dr. Liangcai He, PE, GE, brings over 33 years of experience to Twining. Liangcai has extensive experience in earthquake engineering, soil-structure interaction, field investigations, earthwork and foundation design, retaining walls, seepage and groundwater modeling, embankment dams and levees, slope stability, and preparation of technical reports. His responsibilities have included project planning and management, proposals, cost estimates, field investigation, laboratory testing, engineering analyses, report preparation, plan review, and construction monitoring. Liangcai has performed numerous analyses and modeling for ground motion, site seismic response, liquefaction, lateral spreading, static and dynamic soil-structure interaction, system identification and optimization, slope stability and deformation, bearing capacity, elastic and consolidation settlement, lateral earth pressure, and soil springs. As Chief Geotechnical Engineer, Liangcai will lead geotechnical investigations, analyses, and design efforts, ensuring the integrity and safety of structures by assessing soil conditions, providing expert recommendations, and overseeing quality assurance protocols.

Professional Summary
Liangcai He, PhD, PE, GE
Chief Geotechnical Engineer
F. Attachments
DRAFT

Page 456 of 872 ends

Twining | City of Brentwood 22
State of Nevada, Department of Transportation, Carson City The State of Nevada Department of Transportation embarked on a project aimed at improving Interstate 15. Hossein played a crucial role in a specific section of the project, located near Tropicana Avenue in the city of Nevada. Hossein's responsibilities included designing soil nail walls for the demolition of existing bridges and the construction of new bridges and MSE (Mechanically Stabilized Earth) walls.

Furthermore, Hossein was accountable for conducting slope stability analysis and designing slopes in areas where heavy equipment, particularly oscillators, were utilized.

Hossein's expertise contributed to ensuring the structural integrity and stability of the bridges, MSE walls, and slopes throughout the project, ensuring the safe and efficient operation of the equipment involved.

City of Carlsbad, Desalination Plant Project
The Desalination Plant project in Carlsbad, California involved the construction of a new facility for desalinating water. Hossein played a crucial role as a geotechnical design engineer, focusing on various aspects of the project. One of Hossein's responsibilities was the design and recommendations for all deep foundations, particularly the trestle piles that would support heavy equipment during construction.

Additionally, Hossein conducted evaluations and performed pile drivability analysis for all permanent concrete piles within the project site. Furthermore, Hossein was responsible for the grading of the area surrounding the plant, taking into consideration slope stability. Hossein provided slope stability recommendations and designs, especially in areas where heavy equipment operated during construction. These measures were essential in ensuring the stability of the slopes and facilitating safe working conditions. Hossein's expertise in deep foundations, pile design, and slope stability played a vital role in the successful implementation of the Desalination Plant project.

Years of Experience
20 Education
PhD Fellow, Geotechnical
Engineering, University of
Nebraska
MS, Civil Engineering &
Materials Engineering,
University of Nebraska
MS, Geotechnical & Foundation
Engineering, Islamic Azad
University, Tehran, Iran
BS, Civil Engineering, Islamic
Azad University, Tehran, Iran
Current Registrations/
Certifications
Diplomat, Geotechnical
Engineering (DGE)
Professional Engineer,
CA, No. 96426
Professional Affiliations
American Society of Civil
Engineers (ASCE) Fellow
Relevant Experience
Hossein Bahmyari brings over 20 years of extensive experience in geotechnical engineering design, analysis, and investigation to Twining. With a diverse portfolio of projects, including high-rise structures, underground facilities, and critical infrastructure such as tunnels, highways, dams, and levees, Hossein has worked with a wide range of clients, including private companies and esteemed government entities like State Departments of Transportation, the Army Corps of Engineers, NAVFAC, State and National Water Authorities, and the Federal Highway Administration. Hossein possesses a comprehensive skill set in the field. His areas of expertise encompass a wide array of geotechnical solutions, including retaining walls, shoring and support systems, cofferdam design, earth retaining structures, soil nails, anchor bolts, slope analysis and stability, evaluation of underground utility protection, working surface design, settlement analysis, dewatering, pile drivability analysis, as well as the design of shallow and deep foundations such as driven piles and drilled shafts. Throughout his career, spanning nearly two decades, he has effectively served as a project manager and technical supervisor, successfully overseeing, and guiding numerous geotechnical projects. As Senior Geotechnical Engineer, Hossein will assist in conducting geotechnical analyses, providing technical expertise, and ensuring compliance with project specifications and standards, contributing to the successful execution of the project.

Professional Summary
Hossein Bahmyari, PhD Fellow, PE, DGE
Senior Geotechnical Engineer
F. Attachments
DRAFT

Page 457 of 872 ends

Twining | City of Brentwood 23
City of Long Beach, Shoemaker Bridge Replacement Investigation Shoemaker Bridge is an extension of Shoreline Drive in Long Beach that traverses the Los Angeles River. The scope of work included drilling several deep borings and cone penetration tests (CPT), up to 200 feet deep, in the river using an amphibious carrier with a drill rig and CPT device. Samples and information from the borings and CPTs were used to develop deep foundation recommendations for support of abutments and the bridge span over the river. Additional borings and CPTs on the land side were performed to develop geotechnical recommendations for retaining walls and new pavements. As a Certified Engineering Geologist, Jon observed subsurface drilling and helped draft the report on geologic hazard sections.

SANDAG, South Bay Bus Rapid Transit, Segment 1A
This $16.9 million project consisted of the construction of a six-mile, dedicated bus rapid transit guideway along East Palomar Street in Chula Vista. Twining provided quality control material testing and inspection of asphalt and soils. Jon served as an Assistant Project Manager by providing oversight of inspector soils compaction daily field reports, during the replacement of project underground utility lines.

City of Glendale, View Crest Road Pavement Geotechnical Investigation Several locations along View Crest Road are showing signs of pavement distress and potential slope stability issues. Signs of pavement distress include longitudinal pavement cracks, vertical pavement separation, and deformed guardrails leaning toward the downslope along the entire road. Twining provided geotechnical engineering evaluation for the pavement and the slope. Our scope included reviewing background information and site reconnaissance; performing geologic mapping; coordinating and performing field exploration; performing geotechnical laboratory testing; conducting engineering analyses; and preparing a geotechnical report. Jon served as an Engineering Geologist and oversaw the geological site mapping, and geotechnical drilling, and assisted in writing the final soil report on this project.

Years of Experience
20 Education
BA, Geography, Emphasis in
Environmental and Natural
Resources; Geology Minor,
San Diego State University
GIS, Certificate, San Diego
Mesa College
Current Registrations/
Certifications
Professional Geologist,
CA, No. 9012
Certified Engineering
Geologist, CA, No. 2615
Professional Affiliations
Association of Environmental
and Engineering Geologists
(AEG)
San Diego Association of
Geologists (SDAG)
Relevant Experience
Jon Browning, PG, CEG, brings over 20 years of experience in engineering geology and environmental consulting. His work includes geologic feasibility studies, site characterization, seismic site assessments, and engineering design for mining, civil, and land development projects. Jon specializes in subsurface geotechnical exploration for fault trench and landslide investigations, geologic field mapping, managing large field projects, directing subcontractors, consulting with clients, and preparing technical reports. Jon has extensive experience in subsurface geotechnical and mineral exploration using various drilling techniques, including hollow stem auger, solid stem auger, mud/air rotary, direct push, reverse circulation, sonic, dual rotary, and cone penetrometer testing. His environmental geology expertise covers remedial investigation/ feasibility studies (RI/FS), hydrogeology characterization, remediation system installation, aquifer pump testing, and soil/ groundwater investigations, including well installation. As a Certified Engineering Geologist, Jon leverages his knowledge of geological principles and engineering techniques to assess and mitigate geological hazards, provide geological interpretations, and offer recommendations to support engineering projects.

Professional Summary
Jon Browning, PG, CEG
Certified Engineering Geologist
F. Attachments
DRAFT

Page 458 of 872 ends

Twining | City of Brentwood 24
F. Attachments
City of Elk Grove, Waterman Road Rehabilitation
Twining performed pavement evaluation on approximately two-lane miles of Waterman Road in the City of Elk Grove to recommend repair and rehabilitation strategies for the pavement at project level. Amir served as Senior Pavement Engineer, coordinating the required testing and preparing the final recommendation and design. Several alternative options were provided to the City including conventional asphalt, roller compacted concrete (RCC), and Cement-treated base.

Town of Los Gatos, Almond Grove Street Reconstruction Project, Phase 1&2 The project consists of a multi-phased rehabilitation of a roadway in a historic neighborhood. The rehabilitation consists of removal and replacement of all sidewalks, curb, gutter, driveways and accessibility ramps, and the removal and replacement of the concrete in sections. Twining provided pavement evaluation and recommendations for rehabilitation, as well as geotechnical services during construction. Amir served as Senior Pavement Engineer.

City of Chula Vista, Pavement Engineering Services
Twining was awarded an on-call contract with the City of Chula Vista in 2016 to provide geotechnical, materials testing and inspection, and stormwater services for three years. We provide geotechnical/soil engineering observations during site preparation for placement of fill and construction of sub-drainage systems, and we make recommendations regarding the removal of unsuitable materials for fills and methods of compaction based upon previous soils/geotechnical investigations. Amir is serving as the Project Manager and Project Engineer. He is responsible for oversight of all sampling and testing, as well as providing technical comments regarding possible issues and suggesting solutions to the client, based on the test results.

Years of Experience
11 Education
PhD, Civil and Environmental
Engineering, North Dakota
State University
MS, Railways Engineering,
Iran University of Science and
Technology, Tehran, Iran
BS, Industrial Engineering,
Iran University of Technology,
Tehran, Iran
Relevant Experience
Dr. Amir Ghavibazoo is Twining’s Director of Infrastructure, Asphalt Engineering and Pavement Design. He directs and works on pavement design, highway design, and engineering specifications. He joined Twining in 2014 after completing graduate studies focusing on Pavement Management Systems (MicroPaver), pavement evaluation, and pavement rehabilitation strategies. He is experienced in calculating the Pavement Condition Index (PCI) through visual inspection following the United States Army Corps of Engineers’ methodology, as well as conducting Life Cycle Cost Analysis (LCCA) rehabilitation strategies for pavements. Additionally, he has extensive experience with advanced performance testing of asphalt binders, including Dynamic Shear Rheometer (DSR), Bending Beam Rheometer (BBR), and other asphalt binder quality control tests. He works closely with cities and government agencies to develop unique and specialized mix designs, pavement inspections, and pavement design solutions. Amir also serves on several technical committees in California, helping to create new specifications and update existing ones. He has worked on many projects, such as asphalt rubber projects, Superpave, investigations of pavement distress, and green technologies in pavement construction. As Pavement Expert, Amir will specialize in assessing and designing pavement structures, utilizing his expertise to optimize pavement performance, analyze materials, and implement cost-effective maintenance strategies, ensuring the longevity and functionality of roadways and infrastructure projects.

Professional Summary
Amir Ghavibazoo, PhD
Pavement Expert
DRAFT

Page 459 of 872 ends

Twining | City of Brentwood 25
F. Attachments
Select Project Experience
» City of Brentwood, Balfour Road Shoulder Widening
» Calaveras County, Railroad-Flat Road Bridge Replacement » Caltrans, 03-0H10U4 Route 5, Sacramento County
» Caltrans, 04-0G4604, Route 101, Corte Madera
» Caltrans, 04-0Q9804 Route 101, Santa Clara County
» Caltrans, 04-235624 Highway 101, Palo Alto
» Caltrans, 04-235654 Route 101, Masonry, Willow Interchange » Caltrans, 04-3G59U4 Route 580 & 205, Alameda County
» Caltrans, 04-3J5704 Route 80, Alameda County
» Caltrans, 04-4G8004, Route 580, Alameda County
» Caltrans, 04-4G8304 Highway 85, Sunnyvale
» Caltrans, 04-4H6101 I-680 HOV Lanes, Contra Costa County » Caltrans, 04-4K2204 Route 680, Monument Blvd
» City of Benicia, Street Resurfacing FY 2019
» City of Brentwood, Balfour Road Shoulder Widening
» City of Elk Grove, Civic Center
» City of Fairfield, Amtrak Fairfield-Vacaville Train Station » City of Folsom, Greenback-Madison Folsom Auburn Roadway Rehabilitation » City of Millbrae, Millbrae Recreation Center
» City of Modesto, North Valley Regional Recycled Water Program » City of Placer, Walerga Road Bridge Replacement
» City of Sacramento, J Street Overlay
» City of San Jose, Junipero Serra Boulevard
» City of San Ramon, Community Center Renovation
» County of Alameda, La Riviere Marsh Bridge Marshlands Road » County of Alameda, North Livermore Avenue Pavement Rehabilitation » County of Contra Costa, Kirker Pass Road Northbound Truck Climbing Lane » County of Marin, Central Region Road Rehabilitation
» County of Marin, Civic Center Dr. Improvement
» County of Marin, Tiburon Various Street Overlay FY 2018 » Port of Oakland, South Field Runway 12-30 Rehabilitation » Sacramento Convention Center, Renovation & Expansion
Years of Experience
13 Education
» ACI: Post-Installed Concrete
Anchor Installation
Inspector; Concrete
Transportation Construction
Inspector; Concrete FieldTesting Technician - Grade I
» AWS Certified Welding
» Caltrans: 504, 518, 523.1
Section B.1 & B.2, 539, 540,
543, 556, 557
» ICC: Structural Masonry;
Structural Steel and Bolting
Special; Soils; Structural
Welding; Prestressed
Concrete; Reinforced
Concrete; Spray-Applied
Fireproofing; Commercial
Building; Firestopping CLA;
Commercial Electrical,
Mechanical, Plumbing,
Combination Inspector;
California Electrical,
Mechanical, Plumbing,
Combination Inspector
Relevant Experience
Andrei Polischuk has over 13 years of experience performing construction inspections, sampling, and testing soils, concrete, asphalt, masonry, and reinforced and structural steel. Andrei has a strong working knowledge of construction materials and technologies, having worked as a carpenter prior to becoming an inspector.

Professional Summary
Andrei Polischuk
Field Inspector
DRAFT

Page 460 of 872 ends

Twining | City of Brentwood 26
F. Attachments
Select Project Experience
» Contra Costa Transportation Authority, Mokelumne Bicycle and Pedestrian Overcrossing
» Calaveras County, Railroad-Flat Road Bridge Replacement » Caltrans, 04-0P3404, Various Routes, Alameda County
» Caltrans, 04-2Q1604, Route 680, Contra Costa
» Caltrans, 05-1F6804 Route 1, Monterey County
» Caltrans, 05-1F7004 Route 101, Monterey County
» City of Concord, Commerce Avenue Complete Street Repair » City of Concord, Monument Boulevard Pavement Rehabilitation » City of Davis, Pole Line Road & Olive Drive Bike Pedestrian Connection » City of Elk Grove, Railroad Street & Old Town Plaza Phases 2 & 3 » City of Greenfield, Pavement Maintenance FY 2023
» City of Manteca, CM Louise Avenue Main St to Hwy 99
» City of Manteca, Yosemite Ave. Improvement, Main & Cottage » City of Millbrae, Millbrae Recreation Center
» City of Modesto, State Route 132 West Freeway-Expressway Ph 1 » City of Morgan Hill, 2024 Pavement Rehabilitation
» City of Placer, Walerga Road Bridge Replacement
» City of Roseville, On-Call Roadway and Trail Maintenance » City of San Bruno, Lara Field Parking Lot Rehabilitation » City of San Jose, Local Streets Resurfacing FY 2020
» City of San Ramon, Pavement Management FY 2019
» City of Stockton, Local Street Resurfacing
» City of Stockton, Miner Avenue Complete Street Improvements » City of Turlock, Roads Program Capital Improvement
» County of Alameda, North Livermore Avenue Pavement Rehabilitation » County of Contra Costa, Three Creeks Parkway Restoration » County of El Dorado, Western Placerville Alignment
» County of Yolo, Geotechnical Cores Pavement
» Town of Moraga, 2024 Pavement Rehabilitation
Years of Experience
22 Education
» ACI: PConcrete Field
Testing Technician –
Grade I; Aggregate Testing
Technician - Level 1;
Aggregate Base Testing
Technician
» Caltrans: 105, 125 AGG,
201, 202, 205, 216, 217, 227,
229, 231, 375, 504, 518,
523.1, 539, 540, 543, 556,
557
Relevant Experience
Bryan Bogle brings more than 22 years of technical experience to Twining. His profes-sional experience includes Caltrans, ASTM, and ACI test methods and procedures. He is well versed in the construction practices of Caltrans and has a good working knowledge of the agency’s standard plans and specifications, construction manual, best practices manual, and materials sampling and testing manual.

Professional Summary
Bryan Bogle
Field Inspector
DRAFT

Page 461 of 872 ends

Twining | City of Brentwood 27
F. Attachments
Select Project Experience
» City of Brentwood, Balfour Road Shoulder Widening
» City of Brentwood, AM/PM
» Contra Costa Transportation Authority, Mokelumne Bicycle and Pedestrian Overcrossing
» Bay Area Rapid Transit, Hayward Maintenance Complex, Phase 2 » Caltrans, 04-264724 Route 101, Marin County
» Caltrans, 04-270104 Route 580, Alameda County
» Caltrans, 04-2Q1604, Route 680, Contra Costa
» Caltrans, 04-A6609 North Bay, Concord
» City of Elk Grove, Pavement Slurry Seal and Resurfacing FY 2021 » City of Marina, Imjin Parkway Widening
» City of Millbrae, Millbrae Recreation Center
» City of Millbrae, Skyline Tank
» City of Milpitas, Street Resurfacing FY 2021
» City of Richmond, Castro Ranch Road Rehabilitation
» City of Roseville, Oak Ridge Drive Bridge Over Linda Creek Replacement » City of Roseville, On-Call Roadway and Trail Maintenance Services » City of Sacramento, Del Rio Trail
» City of Salinas, 2024 Pavement Improvements on Various Streets Project » City of San Bruno, Street Rehabilitation for 2022-2023 » City of San Ramon, Faria Preserve Parkway
» City of Stockton, Local Street Resurfacing & Slurry Seal FY 2021 - 2022 » City of Stockton, Miner Avenue Complete Street Improvements » City of Vallejo, Capitol Street, Delwood Street Sauders Drive, and Wilshire Avenue Pavement
» City of Vallejo, Downtown Streetscape Phase 4
» City of Vallejo, Lake Herman Road Widening
» County of Alameda, La Riviere Marsh Bridge Marshlands Road County of Marin, Central Region Road Rehabilitation
» County of Marin, Civic Center Drive Improvement
» County of Solano, Farrell-Gibson & Lake Herman Roads Safety Improvements » Rehabilitation Project
» Town of Moraga, 2024-2025 Pavement Rehabilitation
» Town of Moraga, Pavement Rehabilitation FY 2022
Years of Experience
32 Education
» ACI: PConcrete Field
Testing Technician –
Grade I; Aggregate Testing
Technician - Level 1;
Aggregate Base Testing
Technician
» ICC: Soils Special Inspector
» Caltrans: 105, 125 AGG,
201, 202, 216, 217, 226, 227,
229, 231, 504, 518, 523.1,
539, 540, 543, 552, 556, 557
» OSHA Hazmat
Relevant Experience
Christopher (Chris) Thomas brings over 32 years of experience and technical expertise to Twining. His experience encompasses all aspects of testing and inspection with special emphasis in concrete and concrete and soils.

Professional Summary
Chris Thomas
Field Inspector
DRAFT

Page 462 of 872 ends