Pacifica

Energy contracts the Pacifica City Council took up since 2022. All Pacifica meetings.

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
7actions
5vendors
$0.00approved (recorded vote)
$2,339,293proposed, no vote in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateVendorItemActionAmountSize · price · savingsOutcomeSources
2026-03-23Blocka ConstructionNotice of Completion for the Rockaway Pump Station Rehabilitation and Repair Project
Microgrids and backup power
Other$491,382No vote recordedstaff report · agenda · packet · city original
2025-04-14Blocka ConstructionResolution to Approve Rockaway Pump Station Rehabilitation and Repair Project C006 - Construction Contract with Blocka Construction, Inc.
Microgrids and backup power
Award$488,000No vote recordedstaff report · agenda · packet · city original
2023-12-11C&D PowerResolution - Approve Purchase Agreement with C&D Power Inc for Purchase and Rental of Generator for Sharp Park Pump Station check
Microgrids and backup power
Award$335,790550 KW Blue Star VD550-02FT4 Genset Volvo TYWS1672GE diesel engine gen…
$9,826.00 per month for rental
No vote recordedagenda · packet · other · city original
2023-11-13Hazen and SawyerAuthorizing Task Order No. 1 with Hazen and Sawyer, Inc. for Engineering Design Services for the Rockaway Pump Station Rehabilitation and Repair Project
Microgrids and backup power
Award$66,600No vote recordedstaff report · staff report · agenda · packet · city original
2023-09-25Verdant Energy ElectricNotice of Completion for the Calera Creek Water Recycling Plant Photovoltaic System Improvement Project – Phase 1
Solar and solar PPAs
Other$438,722350 kWp solar photovoltaic system; 528 fixed panels replacedNo vote recordedagenda · packet · other · city original
2023-08-28HDRHigh Voltage Streetlight Conversion (Phase 4) Design Services – Agreement
LED streetlights
Award$259,400
not to exceed
No vote recordedagenda · agenda · packet · packet · city original
2022-07-18HDRHigh Voltage Streetlight Conversion (Phase 4) Design Services – Agreement
LED streetlights
Award$259,400
not to exceed
No vote recordedother · other · city original