West Sacramento
Energy contracts the West Sacramento City Council took up since 2022. All West Sacramento meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
10actions
7vendors
$1,058,664approved (recorded vote)
$491,100proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-06-17 | Advance Design Consultants | Consideration of Amendment No. 1 with Advance Design Consultants, Inc., for the design of emergency generator and electric charging station for the Corporation check Bundles | Amendment | $16,980 | two (2) Level 3 Electric Vehicle Charging Stations; nine (9) dedicated… | No vote recorded | agenda · packet · packet · city original |
| 2025-09-17 | Advance Design Consultants | CONSIDERATION OF CONTRACT AWARD TO ADVANCE DESIGN CONSULTANTS, INC. FOR THE DESIGN OF EMERGENCY GENERATOR AND ELECTRIC CHARGING STATION FOR THE CORPORATION YARD Microgrids and backup power | Award | $59,890 | Approved YES: Guerrero, Early, Orozco, Alcala, Sulpizio Hull; NO: (None); ABSTAIN:… | agenda · packet · packet · city original | |
| 2024-04-10 | Rexel Energy Solutions | Resolution 24-27 regarding Electric Vehicle (EV) Charging Station Installation Project (CIP 11036) check EV charging | Award | — | 10 single-port L2 chargers, 26 dual-port L2 chargers, and 13 singlepor… | Approved | packet · city original |
| 2023-11-15 | Bear Electrical Solutions | CPC23-246 Fuel Cell Backup System Furnish and Install - Re-bid Microgrids and backup power | Award | $474,120 | 4 Each 1KW fuel cell backup power systems and 4 Each with battery back… $57,300.00 per each (item 1); $61,230.00 per each (item 2) | No vote recorded | packet · city original |
| 2023-05-03 | Kimley-Horn and Associates | Amendment No. 3 to Kimley-Horn and Associates professional services contract for PiP design redesign and construction administration check EV charging | Amendment | $24,000 | 12 sites where electric vehicle charging stations (EVCS) are proposed | Approved Approved Item 5 as amended; consent-style roll call not shown in window | minutes · packet · packet · city original |
| 2023-05-03 | FreeWire Technologies | Award of contract with FreeWire Technologies for electric vehicle supply equipment, Amendment No. 3 to Kimley-Horn contract, Resolution 23-36 (CIP 11036) check EV charging | Cooperative purchase | $221,849 | one (1) Boost 200 Charger (200kW) | Approved Approved Item 5 as amended; consent-style roll call not shown in window | agenda · minutes · packet · packet · city original |
| 2023-02-15 | Quantum Energy Services & Technologies | Construction contract award to Quantum Energy Services & Technology, Inc. for West Sacramento Electric Vehicle (EV) Charging Station Installation Project (CIP 1 check EV charging | Award | $706,425 | minimum of 25 L2 charging stations and 7 DCFCs (program commitment) $1,000.00 per day liquidated damages | Approved YES: Guerrero, Alcala, Early, Sulpizio Hull; NO: (None); ABSTAIN: (None);… | agenda · minutes · packet · packet · packet |
| 2022-10-19 | ChargePoint | Electric vehicle supply equipment purchase under Plug-In Partnership Grant EV charging | Purchase order | — | Approved | packet · city original | |
| 2022-07-20 | Rexel Energy Solutions | Public hearing and consideration of Resolution 23-30 adopting Electric Vehicle Charging Fees in the City Book of Fees EV charging | Award | — | 10 single port L2, 26 dual port L2, and 12 single port DCFC charging s… | Approved | packet · city original |
| 2022-06-01 | Kimley-Horn and Associates | Minute Order 22-35 Consent Agenda: Contract Amendment No. 1 with Kimley-Horn for EV Charging Plug-In Partnership design EV charging | Amendment | $46,500 | Approved | packet · city original |