Vendor · Energy
Veolia
Contract actions with Veolia in California city council documents since 2022 — also written as Enovity; Enovity Inc.; Enovity Inc., A Veolia Company; Enovity, A Veolia Company; Enovity, Inc.; Enovity, Inc., A Veolia Company; Enovity, a Veolia Company; Veolia North America; Veolia Sustainable Buildings USA West; Veolia Sustainable Buildings USA West, Inc.; Veolia Sustainable Buildings USA West, Inc. (f/k/a Enovity, Inc.); Veolia Sustainable Buildings USA West, Inc., Formerly Known As Enovity, Inc..
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
10actions
3cities
$4,664,099approved (recorded vote)
$16,335,006proposed, no vote in the index
2023-04-25first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-04-14 | Arvin | Approval of Statement of Work for Solar Generating Facilities Maintenance and Measurement and Verification Services at the Wastewater Treatment Plant, with Veol Solar and solar PPAs | Award | $27,243 not to exceed | Expected Annual Energy Production approximately 1,488,267 kWh for the … Time-and-materials repair rates: $200.00/hr engineering, $125.00/hr ad… | Approved Motion MPT Perez Second CM Reyes Vote 4-0 | agenda · agenda · agenda · agenda · agenda |
| 2025-04-22 | Arvin | Present Change Order #03, #05 & #06 for City Council Approval check Solar and solar PPAs | Amendment | $108,884 not to exceed | 6,500 Cubic Yards of imported fill dirt $233,091 estimated annual energy cost savings | No vote recorded | agenda · city original |
| 2025-03-11 | Arvin | Consideration and approval of Amendment No. 1 to Master Services Agreement No. 2023-31 with Veolia Sustainable Buildings USA West, Inc. for a contingency budget check Solar and solar PPAs | Amendment | $4,285,714 | 997.2 kW-DC ground mounted solar PV system first year savings of $233,091.00; estimated total energy saving of $1… | Approved 4-0 | agenda · agenda · agenda · agenda · agenda |
| 2025-02-25 | Arvin | Consideration and Approval of Amendment No. 1 to Master Services Agreement Number 2023-31 Dated December 4, 2023, Between Veolia Sustainable Buildings USA West, check Solar and solar PPAs | Amendment | $3,670,561 | 997.2 kW-DC first year savings of $233,091.00 under the original NEM v2.0 program | No vote recorded | agenda · city original |
| 2025-02-10 | Palo Alto | Approval of Contract Amendment Number Three to Contract Number C21177024 With Veolia Sustainable Buildings USA West, Inc. to Extend the Contract Time Through Au Efficiency retrofits and ESPCs | Renewal / extension | $1,985,000 not to exceed | No vote recorded | staff report · packet · city original | |
| 2025-01-28 | Arvin | Consideration and Approval of Amendment No. 1 to Master Services Agreement Number 2023-31 with Veolia Sustainable Buildings USA West, Inc. for a Contingency Bud Solar and solar PPAs | Amendment | $615,153 | 997.2 kW-DC ground mounted solar PV system Estimated annual energy cost savings $233,091 | Continued 3-0 | agenda · agenda · agenda · minutes · city original |
| 2024-04-16 | Oakland | Amendment of Enovity's Contract to Access California Energy Commission Funding for Repairs to Oakland Ice Center Efficiency retrofits and ESPCs | Amendment | $3,000,000 not to exceed | critical refrigeration repairs, energy efficiency improvements and add… Loan costs projected to be covered by energy cost savings; biannual pa… | No vote recorded | staff report · staff report · staff report · staff report · staff report |
| 2023-11-14 | Arvin | Enovity Master Services Agreement - solar renewable energy system for Wastewater Treatment Plant Solar and solar PPAs | Award | $3,670,561 | solar renewable energy system at WWTP $229,439.00 first cost savings | No vote recorded | agenda · agenda · agenda · city original |
| 2023-08-22 | Arvin | Consideration of Funding Options for Solar Renewable Energy System at the City of Arvin's Wastewater Treatment Plant. Option #1: Power Purchase Agreement (PPA) Solar and solar PPAs | Award | $3,900,000 | 1,488,267 kWh annually solar system for WWTP $16,859,478.00 Projected Electrical Cost Savings over life of Solar Re… | No vote recorded | agenda · agenda · city original |
| 2023-04-25 | Arvin | Consideration and Approval of A Resolution of the City Council of the City of Arvin Authorizing Veolia North America to Locate and Install A Solar Renewable Ene Solar and solar PPAs | Award | $351,142 | full five acres $0.06 per square foot, escalating 3% per year Immediately reduce cost by 5%; escalation fixed at 3% per year | Approved 4-0 | agenda · agenda · agenda · agenda · agenda |