NOTICE INVITING BIDS
for
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
PROJECT NO. JN 935, PHASE 2
Plans and Specifications are available through ARC Document Solutions. Please be advised that there is an additional charge for delivery. Upon payment of the purchase price, they become the property of the purchaser and may not be returned for refund.
You may access the plans through the following website:
www.e-arc.com/location/costa-mesa/
Scroll down to "Planrooms" and click on *Order From Planwell*. For help accessing and ordering, please contact a Planwell Administrator at 714.424.8525.
Notice is hereby given that the City of Gardena will receive sealed bids at the office of the City Clerk, City Hall, 1700 W. 162nd Street, Gardena, California, until 2:00p.m. on July 31, 2024 and shortly thereafter on this same day, they will be publicly opened and read in the City Clerk’s Office in-person and via ZOOM.
The information to join the bid opening via ZOOM is the following:
Topic: Bid Opening
Time: 2:00 PM Pacific Time on July 31, 2024 (Shortly thereafter the deadline) Join ZOOM Meeting
[https://us02web.zoom.us/j/83241982784]
Meeting ID: 832 4198 2784
Dial by phone: [+1 669 444 9171] US
Should you have any questions or concern in delivering a bid or joining the ZOOM Meeting, please contact City Clerk’s office at (310) 217-9565 or via email at [email protected].
All bids must be in writing, must be sealed, and must be plainly marked on the outside:
"BID ON PROJECT NO. JN 935, PHASE 2. Any bid received after the hour stated above for any reason whatsoever, will not be considered for any purpose but will be returned unopened to the bidder.
Bids are required for the entire work as described below:
The work to be constructed hereunder is located along Artesia Boulevard, from Western Avenue to Vermont Avenue, in the City of Gardena. The major work generally consists of, but is not limited to, Traffic Signal Modifications, Modification of Medians, Landscaping and Irrigation, Asphalt Pavement cold milling and paving. Other related work includes providing traffic control, NPDES compliance, clearing and grubbing, construction of PCC access ramps, curbs and gutters, sidewalks, driveways, adjust manholes to grade, signing and striping including pavement markings, markers, legends, permits and licenses from adjacent jurisdictions and utilities (Union Pacific) and other items not mentioned that are required by the plans and specifications.
The City of Gardena intends to award this project to the winning contractor right after approval of the City council. Construction should commence in the soonest possible time as material procurement (General Provision GP-1), Construction Phasing (Section 601 and Schedule below) and permit requirements (Section 2.2) would allow.
ENGINEER’S ESTIMATE: $4,564,000
The time of completion of contract shall be One Hundred Twenty (120) working days as defined in the latest Standard Specifications for Public Works (“Greenbook”).
Liquidated Damages, as defined in Section 6-9, shall be $5,000 per each consecutive calendar day, or the true cost of damages to the City of Gardena due to lost revenue or additional expenses, whichever is greater.
Each bidder must submit a proposal to the City, c/o City Clerk in accordance with the Plans and Specifications. Said proposal is to be accompanied by a cash deposit, a certified or cashier's check, or a bidder's bond, made payable to the City of Gardena, in an amount not less than 10 percent of the total bid submitted.
The envelope enclosing the proposal shall be sealed and addressed to the City of Gardena c/o City Clerk, and delivered or mailed to the City at 1700 W. 162nd Street, Gardena, California 90247-3778. The envelope shall be plainly marked in the upper left-hand corner as follows:
ATTENTION: CITY, c/o CITY CLERK
(Bidder's Name and Address)
(Number and title of this project)
Below is a project tentative schedule for reference to aid contractor in understanding the phasing (section 601) and timing of the 2 NTP's involve in this project. This schedule would be subject to change based on the results after the 1st NTP and procurement of materials:
August 5 to 7, 2024 City interview of Contractor's key personnel.
August 13, 2024 City Council approves award to Contractor.
September 13, 2024 Construction Contract Fully Executed.
September 30, 2024 City will issue NTP for Equipment and Materials Procurement October 1 to 21, 2024 Equipment and Material Procurement Phase (see page GP-1) October 31, 2024 City will issue NTP for Construction based on the result of the procurement phase.
February 3, 2025 Start of Construction Activities
The successful bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the contract price, and a payment bond in the amount of 100 percent of the contract price, both in a form satisfactory to the City Attorney.
The contractor shall have an active Class “A” license from the Contractor’s State License Board at the time of submitting bid.
Pursuant to Public Contract Code Section 22300, the Contractor may, at Contractor's sole cost and expense, substitute securities equivalent to any monies withheld by the City to insured performance under the contract unless applicable federal regulations or policies do not allow such substitution. Such security shall be deposited with the City, or a state or federally chartered bank as escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the Contract. The Contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any accrued interest thereon. Securities eligible for investment shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. No such substitution shall be accepted until the escrow agreement, letter of credit, form of security and any other document related to said substitution is reviewed and found acceptable by the City Attorney.
The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received.
The award, if made, will be made to the lowest responsive responsible bidder.
Bidders are advised that this Project is a public work for purposes of the California Labor Code, which requires payment of prevailing wages. Accordingly, the bidder awarded the Contract and all subcontractors shall be required to pay not less than the prevailing rate of per diem wages, as determined by the Director of the California Department of Industrial Relations, and otherwise comply with the provisions of Section 1770 et seq. of the California Labor Code, California Code of Regulations, Title 8, Section 16000 et seq., and any other applicable laws, rules and regulations adopted with respect thereto (“California Prevailing Wage Laws”). Copies of such prevailing rates of per diem wages are on file at the Gardena City Clerk’s office and the office of the City Engineer, and copies shall be made available to any interested party on request. The prevailing rates of per diem wages referred to herein are hereby made a part of this Notice by reference.
Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by Contractor or any Subcontractor under it.
Contractor and any Subcontractor under if shall comply with the requirements of said sections in the employment of apprentices.
The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) in a format prescribed by the Labor Commissioner no less than monthly.
As of January 1, 2016, the requirement to furnish electronic certified payroll records to the Labor Commissioner will apply to all public works projects, whether new or ongoing.
Exceptions: The Labor Commissioner may (but is not required to) excuse contractors and subcontractors from furnishing electronic certified payroll records to the Labor Commissioner on a project that is under the jurisdiction of one of the four legacy DIRapproved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District, and County of Sacramento) or that is covered by a qualifying project labor agreement.
These requirements will apply to all public works projects that are subject to the prevailing wage requirements of the Labor Code without regard to funding source.
The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/ index.htm).
Skilled and Trained Workforce: This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.
Award of Contract: The following are conditions to the award of the contract:
I. Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5 provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract was awarded):
and
II. No contractor or subcontractor may be awarded this contract unless the contractor and each subcontractor listed on the bid is registered with the Department of Industrial Relations pursuant to Section 17265.5.
Any questions regarding this bid package may be referred to William Mendoza, Public Works Engineering Division at 310.217.9608. [email protected].
T A B L E O F C O N T E N T S
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
DESCRIPTION PAGE DESCRIPTION PAGE
i
Title Page ....................................................................
Notice Inviting Bids ......................................................
Location Map ...............................................................
Table of Contents ........................................................ i Instructions to Bidders ................................................. ii-iv BID PROPOSAL (To Be Submitted with Proposal)
Bid Schedule ............................................................... BP-2 Acknowledgement of Addenda Received ..................... BP-5 Bidder’s Declaration..................................................... BP-6 Non-collision Affidavit .................................................. BP-8 Declaration of Eligibility to Contract.............................. BP-9 Bid Bond ...................................................................... BP-10 Designation of Subcontractors ..................................... BP-11 Construction Project Reference ................................... BP-12 Certificate of Non-Discrimination by Contractors .......... BP-13 Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion –
Primary Covered Transactions ................................ BP-14 CONTRACT DOCUMENTS (To Be Submitted after Award)
Agreement ................................................................... CD-2 Faithful Performance Bond .......................................... CD-4 Payment Bond ............................................................. CD-6 Workers’ Compensation Insurance Certificate ............. CD-8 Indemnification and Hold Harmless Agreement
Of Subrogation and Contribution .............................. CD-9 Insurance..................................................................... CD-10
GENERAL PROVISIONS
PART 1 – GENERAL PROVISIONS ............................ GP-1 Section 1 – General ................................................ GP-1 Section 2 – Scope of the Work ................................ GP-5 Section 3 – Control of the Work .............................. GP-8 Section 4 – Control of Material ................................ GP-10 Section 5 – Legal Relations and Responsibilities .... GP-11 Section 6 – Prosecution and Progress of the Work . GP-12 Section 7 – Measurement and Payment ................. GP-15 Section 8 – Facilities for Agency Personnel ............ GP-16
TECHNICAL PROVISIONS
PART 2 – CONSTRUCTION MATERIALS ................... TP-1 Section 200 – Rock Materials .................................. TP-1 Section 201 – Concrete, Mortar, and Related
Materials ........................................... TP-1 Section 203 – Bituminous Materials ......................... TP-1 Section 214 – Traffic Striping, Curb and Pavement
Markings, and Pavement Markers ..... TP-2
Section 215 – Signs and Markers ............................ TP-4 PART 3 – CONSTRUCTION METHODS ..................... TP-5 Section 300 – Earthwork ......................................... TP-5 Section 302 – Roadway Surfacing ........................... TP-7 Section 303 – Concrete and Masonry Construction . TP-9
Section 314 – Traffic Striping, Curb and Pavement
Markings, and Pavement Markers ..... TP-11
PART 4 – EXISTING IMPROVEMENTS ...................... TP-11 Section 400 – Protection and Restoration................ TP-11 Section 401 – Removal ........................................... TP-12 Section 402 – Utilities .............................................. TP-13 Section 403 – Manhole Adjustment and
Reconstruction .................................. TP-14 Section 404 – Cold Milling ....................................... TP-14 PART 6 – TEMPORARY TRAFFIC CONTROL ............ TP-14
Section 600 – Access .............................................. TP-14 Section 601 – Temporary Traffic Control for
Construction and Maintenance
Work Zones ...................................... TP-16 PART 7 – STREET LIGHTING AND TRAFFIC
SIGNAL SYSTEMS ..................................... TP-19 PART 8 – LANDSCAPE AND IRRIGATION ................. TP-47
APPENDIX
APPENDIX A: CITY STANDARDS
APPENDIX B: STANDARD PLANS FOR PUBLIC WORKS
CONSTRUCTION
APPENDIX C: CALTRANS STANDARDS
APPENDIX D: UPRR ENCROACHMENT PERMIT
APPENDIX E: CALTRANS ENCROACHMENT PERMIT
APPENDIX F: REFLECTIVE STREET NAME SIGN
SPECIFICATIONS
ii
INSTRUCTIONS TO BIDDERS
FORM OF PROPOSAL
The Proposal shall be fully executed and submitted on the forms in the project specifications and shall be enclosed in a sealed envelope marked and addressed as directed in the Notice Inviting Bids.
PRPOSAL / BID DOCUMENTS
All Proposals shall include the following executed documents to be submitted with each bid:
Bidding Schedule
Acknowledgement of Addenda Received
Bidder's Declaration
Non-Collusion Affidavit
Declaration of Eligibility of Contract
Bid Bond
Designation of Subcontractors
Construction Project Reference
Certificate of Non-Discrimination by Contractors
Certification of Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Primary Covered Transitions
DELIVERY OF PROPOSAL
The Proposal shall be delivered by the time and to the place stipulated in the Notice Inviting Bids. It is the bidder's sole responsibility to see that its Proposal is received as stipulated. Any Proposal received after the scheduled closing time for receipt of proposals will be returned to the bidder unopened.
WITHDRAWAL OF PROPOSAL
The Proposal may be withdrawn by the bidder by means of a written request, signed by the bidder or its properly authorized representative. Such written request must be delivered to the place stipulated in the Notice Inviting Bids for receipt of proposals prior to the scheduled closing time for receipt of proposals. No Proposal may be withdrawn after the hour fixed for opening bids.
iii
MODIFICATIONS AND ALTERNATIVE PROPOSALS
Unauthorized conditions, limitations, or provisions attached to the Proposal will render it informal and may be grounds for its rejection as non-responsive. The completed Proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. Oral, telegraphic, or telephonic proposals or modifications will not be considered.
DISCREPANCIES IN PROPOSALS
In the event there is more than one bid item in a Bidding Schedule, the bidder shall furnish a price for all bid items in the Schedule, and failure to do so will render the Proposal informal and may be grounds for its rejection as non-responsive. The bidder shall state in words and figures the unit prices or the specific sums as the case may be, for which it proposes to supply the labor, materials, supplies, or machinery, and completely perform the Contract. The total amount of each item bid and the total amount of the bid shall be stated in words and figures.
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount named by a bidder for any items are not in agreement, the unit price alone will be considered as representing the bidder's intention and the total will be corrected to conform thereto.
PROPOSAL GUARANTEE – BIDDER’S SECURITY
Each bidder shall submit with his Proposal cash, an unconditional certified or cashier's check, or a bidder's bond, in the sum of the percentage of the bid stated in the Notice Inviting Bids, payable to the City as a guarantee that the bidder will, if its Proposal is accepted, execute the Contract and furnish a satisfactory Faithful Performance Bond, a satisfactory Payment Bond and insurance certificates as specified herein.
If a bidder to whom an award is made, fails or refuses to sign the Contract or furnish the required bonds and certificates, all within the time stated in Section 2-1.5 of the Special Provisions herein, the funds represented by said cash, check or bidder's bond shall be forfeited and become and remain the property of the City; the amount thereof being agreed to by the bidder and the surety as a bid bond forfeiture due the City because of the delay in the execution of the Contract and in the performance of work thereunder, resulting from such failure or refusal, except that if the City awards the contract to the next lowest responsive responsible bidder, only that portion of the bidder's security equal to the difference between the two bids will be forfeited.
A Bid Bond must be obtained from a corporate surety authorized to do business as such in the State of California as an “admitted surety insurer” and shall be on the form furnished by the City or one substantially in conformance with it. Certified or cashier's checks must be drawn on a solvent state or nationally chartered bank or branch thereof in the State of California. The liability of the City in connection with the checks shall be limited to the return of the checks (without interest) as provided in Section 2-1.6 of the Special Provisions bound herein.
DISQUALIFICATION OF BIDDERS
A person, firm, or corporation shall NOT be allowed to make or file, or to be interested in, more than one bid, except an alternative bid when specifically requested; provided, however, a person, firm, or corporation who has submitted a sub-proposal to a bidder submitting a iv
Proposal, or who has quoted prices on materials to such bidders, is not thereby disqualified from submitting a sub-proposal or from quoting prices to other bidders submitting proposals, or from submitting a Proposal as a prime contractor. Similarly, failure to comply with the registration requirements of Labor Code Section 1725.5, as further described in the Notice Inviting Bids, will disqualify a bidder.
ADDITIONAL REQUIREMENTS
The bidder's attention is directed to the Special Provisions and Technical Provisions bound herein for additional requirements of the Proposal and Contract Documents.
CONTRACT DOCUMENTS
Contract Documents are to be submitted within twenty-one (21) calendar days AFTER award of contract. Unless extended by agreement of the City, failure to timely submit executed Contract Documents may be grounds for rejecting the bid award and forfeiture of the bid security. See enclosed documents commencing on page CD-1.
TO BE SUBMITTED WITH PROPOSAL
BP-1
BID PROPOSAL (BP)
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
PROJECT NO. JN 935, PHASE 2
Contractor:
Address:
Phone:
Fax:
License No.:
D.I.R. No.
Email:
To Be Submitted
WITH
Bid Package
TO BE SUBMITTED WITH PROPOSAL
BP-2
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
BID SCHEDULE
The undersigned, having examined the proposed Contract Documents titled:
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
and having visited the site and examined the conditions affecting the work, hereby proposes and agrees to furnish all labor, materials, equipment, and appliances, and to perform operations necessary to complete the work as required by said proposed Contract Documents and itemized bid schedule below. All work shall be completed within one hundred (100) Working Days from the date the Notice of Proceed is issued by the Engineer.
Item
No. Item Description Unit
Approx
Quantity
Unit Price
in Figures Item Total
1 Mobilization/Demobilization (not to
exceed 5% of subtotal)
LS 1
$ $
2 Traffic Control (Including Construction
Signs and CMS)
LS 1
$ $
3 Cold Mill Asphalt Pavement (2" uniform
depth)
SF 595,000
$ $
4 Remove and Construct PCC 6" Median
Curb
LF 515
$ $
5 Remove and Construct Curb and Gutter LF 500
$ $
6 Remove and Construct Concrete
Sidewalk
SF 3,860
$ $
7 Remove and Construct Concrete
Driveway
SF 690
$ $
8 Remove and Construct Curb Ramp EA 35
$ $
9 Remove and Construct PCC Cross
Gutter Panel
SF 60
$ $
10 Construct Cobble Maintenance Strip
(12" wide)
SF 3,830
$ $
11 Construct Cobble Field Paving SF 14,620
$ $
12 Construct AC Digout / Reconstruction
(10" Thick)
TON 1,960
$ $
13 Construct 2" Asphalt Rubber Hot Mix
Surface Course
TON 7,430
$ $
14 Install ADA Truncated Domes for Track
Crossings
EA 4
$ $
15 Install Type E Traffic Loops for
eastbound Artesia at Vermont
EA 8
$ $
TO BE SUBMITTED WITH PROPOSAL
BP-3
Item
No. Item Description Unit
Approx
Quantity
Unit Price
in Figures Item Total
16 Adjust Manhole Frame and Cover to
Grade
EA 12
$ $
17 Adjust Water Valve to Grade EA 5
$ $
18 Traffic Signal Modification – Artesia
Boulevard and Gardena Market Place
LS 1
$ $
19 Traffic Signal Modification – Artesia
Boulevard and Dalton Avenue
LS 1
$ $
20 Traffic Signal Modification – Artesia
Boulevard and Normandie Avenue
LS 1
$ $
21 Traffic Signal Modification – Artesia
Boulevard and Gateway
LS 1
$ $
22 Traffic Signal Modification – Artesia
Boulevard and Shopping Center
LS 1
$ $
23 Remove Existing, Furnish and Install
LED Illuminated Street Name Sign
EA 13
$ $
24 Signing, Pavement Markings, and
Striping
LS 1
$ $
25 Irrigation Improvements LS 1
$ $
26 Landscape Improvements LS 1
$ $
TOTAL CONTRACT BID:
(Figures) $
(Words)
ALTERNATE BID ITEM
Item
No. Item Description Unit
Approx
Quantity
Unit Price
in Figures Item Total
23A Remove Existing, Furnish and Install
Reflective Street Name Sign
(see Appendix F)
EA 19
$ $
TOTAL ALTERNATE BID ITEM:
(Figures) $
(Words)
TO BE SUBMITTED WITH PROPOSAL
BP-4
* In case of error in extension of price into the total price column, the unit price will govern.
The contract shall be awarded to the lowest responsible bidder based on the TOTAL CONTRACT BID.
All work required and shown on the construction plans and this specification for which no price or item is listed on this proposal, it shall be understood that such work, equipment, labor, tools and materials shall be provided without extra charge, allowance or direct payment of any kind. Payment for performing such work or furnishing such equipment, labor, tools and materials shall be included in the above lump sum or unit bid prices and no additional compensation will paid therefore.
If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid will be replaced as non-responsive.
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the bidder’s intention and all totals will be corrected to conform thereto.
Attached hereto is cash, a certified check, a cashier's check, or a bidder's bond in the amount of _______________________________________________________________________Dollar s, said amount being not less than 10 percent of the amount bid. Pursuant to Public Contract Code Sections 20172 and 20174, it is agreed a portion equal to the difference between the low bid and second low bid shall be retained as a bid bond forfeiture by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.
Name of Bidder
Signature of Bidder
TO BE SUBMITTED WITH PROPOSAL
BP-5
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
ACKNOWLEDGEMENT OF ADDENDA RECEIVED
The Bidder shall acknowledge the receipt of addenda by number and date each addendum received.
Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addenda will be issued only through the ARC Document Solutions and access under their Public Planroom (http://www.e-arc.com/location/costa-mesa/). It is the Bidder’s sole responsibility to visit the Planroom to obtain and administer any Addendum related to this bid.
An Addendum must be acknowledged above by a bidder in its submitted form of Proposal.
If an addendum or addenda have been issued by the City and not noted above as being received by the Bidder, the Bid Proposal may be rejected. ____________________________________ _____________________________ Bidder’s Signature Date
TO BE SUBMITTED WITH PROPOSAL
BP-6
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
BIDDER'S DECLARATION
It is understood and agreed that:
1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.
2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.
3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.
4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.
The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.
The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.
5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding. The undersigned has not in any manner sought by collusion to secure for himself any advantage over any other bidder.
6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the City after evaluation of the bids as submitted. The undersigned agrees that the City shall recover or retain as a bid bond forfeiture an amount equal to the difference between the low bid and amount of the bid of the bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest bidder in accordance with the provisions of the Public Contract Code Sections 20172 and 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefore within the time provided.
TO BE SUBMITTED WITH PROPOSAL
BP-7
BIDDER'S DECLARATION (Continued)
7. The undersigned bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.
Respectfully submitted,
_______________________________ ______________________________________ Contractor's Business Name Contractor (Print) Title
________________________________ ______________________________________ Business Address: Street Signature Title
________________________________ ______________________________________ City State Zip Contractor's License No. and Classification ________________________________ ______________________________________ Business Phone Number Business Fax Number
Date
________________________________ ______________________________________ Name Title Residence: Street
________________________________ ______________________________________ City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the bidder, whose address must be given: if it is made by a firm, it must be signed in the copartnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each partner (general and/or limited) must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.
TO BE SUBMITTED WITH PROPOSAL
BP-8
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
NON-COLLUSION AFFIDAVIT
(To be executed by Bidder and submitted with Bid)
State of California
County of Los Angeles
being first duly sworn, deposes and
says that he or she is of
the party making the foregoing bid, that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, or agent thereof to effectuate a collusive or sham bid.
NAME OF BIDDER
SIGNATURE OF BIDDER
ADDRESS OF BIDDER
CITY STATE ZIP
ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)
TO BE SUBMITTED WITH PROPOSAL
BP-9
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] The undersigned, a duly authorized representative of the contractor, certifies and declares that:
1. The undersigned contractor is aware of Sections 1777.1 and 1777.7 of the California Labor Code, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.
2. The undersigned contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.
3. The undersigned contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.” “(b) Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract, and any public money that may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the awarding body. The contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”
4. The undersigned contractor has investigated the eligibility of each and every subcontractor the undersigned contractor intends to use on this public works project, and has determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this ______ day of _________, 20 _, at _________ _______ ________ (place of execution),
California__________.
Signature: ____________________________ Name: _________________________________ Title: ________________________________ Company: ______________________________
TO BE SUBMITTED WITH PROPOSAL
BP-10
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT , as Principal,
and , as Surety,
are held firmly bound unto the City of Gardena in the sum of $ ;
DOLLARS,
(not less than ten percent of total amount of bid)
for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a bid to the City to perform all work required under the following:
PROJECT: ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
NOW, THEREFORE, if said Principal is awarded a Contract by the City and, within the time and in the manner required in the Specifications for said project, enters into the written form of Contract bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by the City and judgment is recovered, said Surety shall pay all costs incurred by the City in such suit, including a reasonable attorneys’ fee to be fixed by the court. Surety hereby waives the provisions of California Civil Code §2845.
SIGNED AND SEALED, this day of , 20 .
(SEAL) (SEAL)
Principal Surety
BY: BY:
Signature Signature
Note: This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney–in-fact must be attached.
TO BE SUBMITTED WITH PROPOSAL
BP-11
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
DESIGNATION OF SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100- 4113 of the Public Contract Code of the State of California, and any amendments thereto, each bidder shall set forth below the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.
If the contractor fails to specify a subcontractor for any portion of the work to be performed under the contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.
Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the City.
Portion
of Work
% Subcontractor's Name & Address
Type of
Work
State
License
Number Class
D.I.R.
Number
Not more than _____%.
TO BE SUBMITTED WITH PROPOSAL
BP-12
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
CONSTRUCTION PROJECT REFERENCE
In order to more fully evaluate your background and experience for the project herein proposed, please submit a list of Public Works and/or similar construction projects completed or in progress within the last three (3) years. Failure to provide this information may constitute grounds for rejection of your bid as non-responsive.
Number of years as a contractor in construction work of this type:
Three projects of this type recently completed:
1. Name (Firm/Agency):
Address:
Contact Person: Telephone No.:
Title of Project:
Project Location:
Date of Completion: Contract Amount: $
2. Name (Firm/Agency):
Address:
Contact Person: Telephone No.:
Title of Project:
Project Location:
Date of Completion: Contract Amount: $
3. Name (Firm/Agency):
Address:
Contact Person: Telephone No.:
Title of Project:
Project Location:
Date of Completion: Contract Amount: $
NOTE: If requested by the City, the bidder shall furnish a certified financial statement, references, and other information sufficiently comprehensive to permit an appraisal of his current financial condition.
Bidder's Signature
TO BE SUBMITTED WITH PROPOSAL
BP-13
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.
We agree specifically:
1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.
2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.
3. To take affirmative steps to hire minority employees within the company.
FIRM
TITLE OF PERSON SIGNING
SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:
TO BE SUBMITTED WITH PROPOSAL
BP-14
BID PROPOSAL
PROJECT NO. JN 935, PHASE 2_
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION – PRIMARY COVERED TRANSACTIONS
(BEFORE COMPLETING CERTIFICATION, READ INSTRUCTIONS ON NEXT PAGE) The Contractor shall not perform Work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. The Contractor and Subcontractors shall not be debarred or suspended throughout the duration of the Contract pursuant to Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. If the Contractor or any Subcontractor becomes debarred or suspended during the duration of the Project, the Contractor shall immediately notify the City.
1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals:
a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
b. Have not within a 5-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statement, or receiving stolen property; c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph 1b of this certification; and d. Have not within a 5-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.
Signature: ____________________________ Name: _________________________________ Title: ________________________________ Company: ______________________________
TO BE SUBMITTED WITH PROPOSAL
BP-15
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION – PRIMARY COVERED TRANSACTIONS
(Continued)
INSTRUCTIONS FOR CERTIFICATION
1. By signing and submitting this proposal, the prospective primary participant is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.
4. The prospective primary participant shall provide immediate written notice to the department or agency to which this proposal is submitted if at any time the prospective primary participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department or agency to which this proposal is submitted for assistance in obtaining a copy of those regulations (13 CFR Part 145).
6. The prospective primary participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.
7. The prospective primary participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-- Lower Tier Covered Transactions," provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the ineligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List.
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.
CD-1
CONTRACT DOCUMENTS (CD)
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
PROJECT NO. JN 935, PHASE 2
To be Submitted
within twenty-one (21) calendar days
AFTER
Award of Contract
CD-2
CONTRACT DOCUMENT
PROJECT NO. JN 935, PHASE 2_
AGREEMENT
THIS AGREEMENT, made and entered into this day of , 20 , by and between CITY OF GARDENA in the State of California, hereinafter referred to as “CITY” and , hereinafter referred to as “CONTRACTOR.”
The City and the Contractor mutually agree as follows:
ARTICLE I.
THE PROJECT
For and in consideration of the mutual promises set forth herein, Contractor agrees to perform and complete in a good and workmanlike manner all work required by the Contract Documents for City Project No. JN 935 , which is described as follows:
Title: ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
Said work shall be performed in accordance with the Plans, Specifications and other Contract Documents, all of which are referenced in Article III hereof and incorporated herein as though fully set forth. Contractor shall furnish at its own expense all labor, materials, equipment and services necessary therefore, except such labor, materials, equipment and services as are provided in the Contract Documents to be furnished by City.
This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.
ARTICLE II.
CONTRACT SUM AND PAYMENT
For performing and completing the work in accordance with the Contract Documents, City shall pay Contractor, in full compensation therefore, the contract sum set forth in the Bidding Schedule. Said sum shall constitute payment in full for all work performed hereunder, including, without limitation, all labor, materials, equipment, tools and services used or incorporated in the work, supervision, administration, overhead, expenses and any and all other things required, furnished or incurred for completion of the work as specified in the Contract Documents. City shall make payments to Contractor on account of the contract sum at the time, in the manner, and upon the conditions specified in the Contract Documents.
ARTICLE III.
CONTRACT DOCUMENTS
The Contract Documents, which constitute the entire agreement between the City and the Contractor, are enumerated as follows: Proposal Documents, including the Notice Inviting Bids, Instructions to Bidders, Bidding Schedule, Bidder's Declaration, Designation of Subcontractors, Bidder's Assurance, and Fair Employment Practices documents; this Agreement; Standard Specifications; Special Provisions; Technical Provisions; Drawings; Plans; and all addenda issued prior to and all modifications issued after the execution of this Agreement. These form the Contract, and all are as fully a part of the Contract as if attached to this Agreement or repeated herein.
CD-3
ARTICLE IV.
EFFECTIVE DATE
This Agreement shall become effective and commence as of the date set forth below on which the last of the parties, whether City or Contractor, executes said Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by their proper officers thereunto duly authorized.
CITY CONTRACTOR
By: By:
MAYOR (Sign) Sign / Title
Date: Date:
SEAL
Attest: Attest: (Contractor)
By:
CITY CLERK (Sign) By:
Sign / Title
Date: Date:
APPROVED AS TO FORM:
By:
CITY ATTORNEY (Sign)
Date:
CD-4
CONTRACT DOCUMENT
PROJECT NO. JN 935, PHASE 2_
FAITHFUL PERFORMANCE BOND
WHEREAS, the City of Gardena has awarded to ___ _____, hereinafter designated as the "Principal", a Contract for:
PROJECT: ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract;
NOW, THEREFORE, we,
as Principal, and
as Surety, are held and firmly bound unto the City in the sum of Dollars ($ ), this amount being not
less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
In case suit is brought upon this bond, the Surety will pay all court costs and reasonable attorneys’ fees to the City of Gardena in an amount to be fixed by the court.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, well and truly keep and perform all the undertakings, terms, covenants, conditions and agreements in the said Contract and any alteration thereof, made as therein provided, all within the time and in the manner therein designated and in all respects according to their true intent and meaning, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
FURTHER, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849. The City is the principal beneficiary of this bond and has all rights of a party hereto.
CD-5
This bond shall remain in full force and effect for a warranty period of one full year after acceptance of the job by the City.
IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and Surety named herein, on the day of , 20 , the name
and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body. [PRINCIPAL]
By
Title
Signature
[SURETY]
By
Title
Address
Phone No.
Signature
All signatures must be notarized.
Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.
Corporations must affix corporate seal.
CD-6
CONTRACT DOCUMENT
PROJECT NO. JN 935, PHASE 2_
PAYMENT BOND
WHEREAS, the City of Gardena has awarded to , as
Contractor, a contract for the work described as follows:
PROJECT: ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
AND WHEREAS, said Contractor is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons, as provided by law;
NOW, THEREFORE, we, the undersigned Contractor and Surety, are held firmly bound unto the City in the sum of ,
Dollars ($ _____ ) this amount being not less than one hundred percent (100%) of the total Contract price, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if said Contractor, its heirs, executors, administrators, successors, assigns, or subcontractors shall fail to pay any of the persons named in Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, or any other amounts due to persons under any applicable project contract or law, with respect to such work and labor, then the Surety or Sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, the said Surety will pay all court costs and reasonable attorneys’ fees to the plaintiff(s) and City in an amount to be fixed by the court.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 3181 as to give a right of action to such persons or their assigns in any suit brought upon this bond.
Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849.
CD-7
This bond shall remain in full force and effect for six full months after the period in which verified claims may be filed as provided for in Section 3184 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals on this day of 20 .
[PRINCIPAL]
By
Title
Signature
[SURETY]
By
Title
Address
Phone No.
Signature
All signatures must be notarized.
Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.
Corporations must affix corporate seal.
CD-8
CONTRACT DOCUMENT
PROJECT NO. JN 935, PHASE 2_
WORKER'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of the Contract.
DATED:
CONTRACTOR
By
Signature
Title
ATTEST:
By
Signature
Title
CD-9
CONTRACT DOCUMENT
PROJECT NO. JN 935, PHASE 2_
INDEMNIFICATION AND HOLD HARMLESS AGREEMENT
AND WAIVER OF SUBROGATION AND CONTRIBUTION
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
To the fullest extent permitted by law, Indemnitor hereby agrees, at its sole cost and expense, to defend, protect, indemnify, and hold harmless the City of Gardena and its respective elected officials, officers, attorneys, agents, employees, volunteers, successors, and assigns (collectively “Indemnitees”) from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith (collectively “Liabilities”), arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to any act, failure to act, error, or omission of Indemnitor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to the above-referenced contract, agreement, license, or permit (the “Agreement”) or the performance or failure to perform any term, provision, covenant, or condition of the Agreement, including this indemnity provision. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against an Indemnitee shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. Indemnitor shall pay Indemnitees for any attorney fees and costs incurred in enforcing this indemnification provision. Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a), or (b) the contracting public agency’s active negligence to the limited extent that the underlying Agreement is subject to Civil Code 2782(b). This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under the Agreement or any additional insured endorsements which may extend to Indemnitees.
Indemnitor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees. Accountants, attorneys, or other professionals employed by Indemnitor to defend Indemnitees shall be selected by Indemnitees.
In the event there is more than one person or entity named in the Agreement as an Indemnitor, then all obligations, liabilities, covenants and conditions under this instrument shall be joint and several. “Indemnitor”
Company/Contractor
Name & Title
Signature & Date
CD-10
CONTRACT DOCUMENT
PROJECT NO. JN 935, PHASE 2_
INSURANCE
CERTIFICATION OF INSURANCE (COI) SHALL BE SUBMITTED BY THE CONTRACTOR
1. COMMENCEMENT OF WORK. Contractor shall not be authorized to commence Work under this Contract until it has obtained approved insurance. Before beginning Work hereunder, during the entire period of this Contract, for any extensions hereto, and for periods after the end of this Contract as may be indicated below, Contractor must have and maintain in place not less than the insurance coverages required in this Section at his sole cost and expense. Contractor’s insurance shall comply with all items specified by this Contract. Any subcontractors shall be subject to all of the requirements of this Section and Contractor shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Contractor’s insurance may cover all subcontractors. The insurance requirements are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Contractor under this Contract.
2. INSURANCE COMPANY REQUIREMENTS. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.
3. COVERAGES, LIMITS AND POLICY REQUIREMENTS. Contractor shall maintain the types of coverages indicated below:
4. COMPREHENSIVE GENERAL LIABILITY INSURANCE. A policy of comprehensive general liability insurance written on a per occurrence basis in an amount not less than either one million dollars ($1,000,000) per occurrence or two million dollars ($2,000,000) aggregate.
5. COMMERCIAL AUTO LIABILITY INSURANCE. A policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, ed. 12/93, including Symbol 1 (any auto) with no special limitations affecting City. The minimum auto insurance coverage shall be one million dollars ($1,000,000) combined single limit per accident.
6. WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE. A policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars ($1,000,000) per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.
In accordance with the provisions of section 1860 of the California Labor Code, Contractor's attention is directed to the requirement that in accordance with the provisions of section 3700 of the California Labor Code, Contractor and every subcontractor will be required to secure the payment of compensation of his or her employees, or obtain a certificate of CD-11
consent to self-insurance by the Director of Industrial Relations in accordance with the requirements of Section 3700 of the California Labor Code.
In accordance with the provisions of section 1861 of the California Labor Code, Contractor shall sign and file with the awarding body the following certification prior to performing any work on the Project:
"I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."
7. POLICY REQUIREMENTS. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
(i) City and its appointed and elected officers, employees, agents and volunteers shall be added as additional insured to the policy as respects liabilities arising out of the performance of any work done under the Contract. (ii) The insurer shall agree to provide City with thirty (30) days prior written notice, return receipt requested, of any cancellation, non-renewal or material change in coverage.
(iii) For any claims with respect to the Project covered by this Contract, Contractor’s insurance coverage shall be primary insurance as respects City and its elected and appointed officers, employees, agents and volunteers. Any insurance or self-insurance maintained by City and its elected and appointed officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not contribute with it.
(iv) The policy shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company’s liability.
8. COURSE OF CONSTRUCTION INSURANCE. Contractor shall provide course of construction insurance covering for “all risks” of loss in the amount of the completed value of the Work. The City shall be named as a loss payee and the insurer shall waive all rights of subrogation against the City. This policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled until thirty (30) days written notice, return receipt requested, is mailed to the City. Course of Construction Insurance may be provided for each separate Phase.
9. ADDITIONAL REQUIREMENTS. The procuring of required insurance shall not be construed to limit Contractor’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Contract. City shall notify Contractor in writing of changes in the insurance requirements. If Contractor does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Contractor shall be deemed in default hereunder.
10. DEDUCTIBLES. Any deductible or self-insured retentions must be declared to and approved by City. Contractor shall guarantee that, at the option of the City, either: the insurer shall eliminate or reduce such deductibles or self-insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Contractor); or Contractor shall provide satisfactory financial guarantee for payment CD-12
of losses and related investigations, claim administration and defense expenses in the amount of any deductibles or self-insured retentions.
11. VERIFICATION OF COMPLIANCE. Contractor shall furnish City with the required endorsements attached hereto. All documents are to be received and approved by City before Work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Contract, Contractor shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefore, or accompanied by other proof of payment satisfactory to City. Contractor shall provide full copies of any requested policies to City within three (3) days of any such request by City.
12. TERMINATION FOR LACK OF REQUIRED COVERAGE. If Contractor, for any reason, fails to have in place, at all times during the term of this Contract, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Contractor’s expense and/or terminate this Contract. Contractor shall indemnify, defend and hold harmless City and its elected and appointed officers, employees, agents and volunteers from any claim resulting from failure of either Contractor or any subcontractor to take out or maintain any insurance required by this Contract.
13. EQUIPMENT COVERAGE. Any policy or policies of insurance Contractor or his subcontractors elect to carry as insurance against loss or damage to construction equipment and tools or other personal property shall include a provision waiving the insurer’s right of subrogation against City.
GP-1
GENERAL PROVISIONS
ARTESIA BOULEVARD ARTERIAL IMPROVEMENTS
(JN 935, PHASE 2)
NOTICE TO PROCEED (NTP). Due to the long lead time for the procurement of traffic signal poles, traffic signal equipment and other miscellaneous items, the City will issue two (2) separate Notices to Proceed:
NTP for Equipment for Materials Procurement – This NTP will be issued right after contract execution and with an allotted period of 21 calendar days. Processing (submission / review / approval) of submittals shall commence immediately. The city and its design consultants will hold several online meetings with the contractor and its subcontractors to identify long lead time (more than 3 months) equipment and materials.
These equipment and materials like, but not limited to, Traffic Signal, Irrigation, Hardscape and Landscape shall be sourced out immediately. Contractor and Design consultants shall work together to look for possible alternates or equivalent for equipment and materials that will be delivered late and become critical to the overall project schedule/phasing (See Section 601.1 for project Phasing). Only after extensive efforts of shortening delivery time through substitution can procurement be finalized.
Upon approval of the city, contractor shall immediately within 5 business days order/procure subject equipment and materials and show proof of such procurement and promised delivery date from its suppliers. When the city is satisfied with the delivery dates, then the project schedule can be finalized and shall be the basis of issuance of the NTP for construction (NOT PART OF WORKING DAYS). See Section 6-1.1 for construction schedule requirements.
NTP for Construction - This NTP will be a standard NTP that will be issued by the city based on the delivery commitment/schedule agreed and approved on the NTP for Equipment and Materials Procurement Phase. Construction activities shall begin immediately and continue in a diligent and workman-like manner without interruption, and to complete the construction within the 120 working days. Sequence of construction shall adhere to the Construction Phasing on Section 601-1. Liquidated damages as stated in these specifications will apply only to the NTP for Construction.
PART 1 – GENERAL PROVISIONS
SECTION 1 – GENERAL
1-1 GENERAL. The Standard Specifications for Public Works Construction (“Greenbook”) written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California shall be the Standard Specifications of the City. All work shall conform to the 2021 edition, including supplements of the Standard Specifications, the Special Provisions which supplement or modify the Standard Specifications, and the Standard Drawings as issued by the City (defined herein as “Agency”) available at the time bids are opened unless otherwise specified in the Contract Documents.
The above referenced Standard Specifications, Special Provisions and Standard Drawings are hereby made a part of the Contract Documents.
GP-2
For the convenience of the Contractor, the section and subsection numbering system used in these Special Provisions corresponds to that used in the Standard Specifications. 1-2 TERMS AND DEFINITIONS. Whenever in the Standard Specification the following terms are used, they shall be understood to mean and refer to the following:
(a) AGENCY The City of Gardena, a California municipal corporation. (b) BOARD The City Council of the City of Gardena
(c) CONTRACT Documents including but not limited to the proposal forms, DOCUMENTS Standard “Greenbook” Specifications, Special Provisions, Technical Provisions, Notice Inviting Bids, Instructions to Bidders, Bonds, Insurance, Contract and all Addenda
setting forth any modifications of the documents.
(d) ENGINEER The City of Gardena Director of Public Works/City Engineer or his authorized representative.
(e) BIDDER An individual, co-partnership, association or corporation submitting a proposal for the work contemplated, acting directly or through a duly authorized representative.
(f) LEGAL ADDRESS The legal address of the Contractor to be the address OF CONTRACTOR given on the Contractor’s bid and is hereby designated as the place to which all notices, letters or other
communications to the Contractor shall be mailed or
delivered.
(g) LABORATORY An established laboratory approved and authorized by the Engineer for testing materials and work involved in the contract.
1-7 AWARD AND EXECUTION OF THE CONTRACT.
1-7.1 General. The proposal shall be fully executed and submitted on the forms provided by the Agency and shall be enclosed in a sealed envelope marked and addressed as directed in the “Notice Inviting Bids”.
If the proposal is made by an individual, it shall be signed and his or her full name and address shall be given; if it is made by a firm it shall be signed with co-partnership name by a general partner thereof, who shall also sign his or her known name, and the name and address of each member of such co-partnership shall be given; if made by a corporation, the name of the corporation shall be signed by its duly authorized officers and attested by the corporate seal.
Bidders are warned against making erasures or alterations of any kind on their Proposal.
Proposals which contain omissions, erasures, alterations, conditions or additions not called for may be rejected.
At the time the Contract is awarded by the Agency, the Contractor shall be licensed under the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California to do the type of work contemplated in the Contract and shall be skilled and regularly engaged in the general class or type of work required by this Contract.
GP-3
1-7.2 Contract Bonds. The “Performance Bond” is equivalent to City’s “Faithful Performance Bond”.
1-7.3 Examination of Plans, Specifications and Project Site. Bidders shall read the specifications, review the drawings and examine the existing facilities to fully understand the project in order to plan for the improvements as shown in the contract, including local condition, uncertainty of weather and all other contingencies.
Bidders shall satisfy themselves by personal examination of the proposed work sites, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Proposal forms. Information derived from the maps, plans, specifications, profiles, drawings, or from the Engineer/Architect of the record, shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not guaranteed nor is any liability assumed by the Agency. 1-7.4 Interpretation of Drawings and Documents. If a prospective bidder is in doubt as to the true meaning or intent of any part of the Contract Documents including the Specifications, or discovers discrepancies in, or omissions from, the Specifications or Drawings, he may submit to the Engineer a written request for an interpretation or a correction thereof. Interpretations or corrections of the Contract Documents including the Specifications and Drawings, shall be made only by addendum duly issued by the Engineer, and a copy of such addendum will be sent by certified mail, postage prepaid, or delivered to each person receiving a set of the Contract Documents whose address is known to the Engineer and such addendum shall be considered a part of and incorporated in the Contract Documents. 1-7.5 Award of Contract. After the Proposals have been publicly opened and read aloud, they will be checked for accuracy and compliance with all provisions as specified herein.
The Agency reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received.
Bids subsequently shown to be mathematically unbalanced would be rejected as nonresponsive.
A mathematically unbalanced bid is one containing lump sum or unit bid items which do not reflect reasonable actual costs plus a reasonable proportionate share of the bidder’s anticipated profit, overhead costs, and other indirect costs, which he/she anticipates for the performance of the items in question.
“A bid is mathematically unbalanced if the bid is structured on the basis of nominal prices for some work and inflated prices for other work; that is, each element of the bid must carry its proportionate share of the total cost of the work plus profits.” “A bid is materially unbalanced if there is a reasonable doubt that award to the bidder submitting the mathematically unbalanced bid will result in the lowest ultimate cost to the Government.
Consequently, a materially unbalanced bid may not be accepted.” Award of the Contract, if it be awarded, will ordinarily be made by the Agency within 30 days after opening of the bids. Award will be made to the lowest responsive responsible bidder.
In selecting the lowest responsive responsible bidder, consideration will be given to the general competency of the bidder for the performance of the work covered by the proposal. To receive favorable consideration, a bidder may be required to present evidence that he has successfully performed similar work of comparable magnitude or submit other evidence satisfactory to the GP-4
Agency that he or his associates are competent to manage the proposed undertaking and to carry it forward to a successful conclusion. Professional integrity and honesty of purpose shall be essential requirements. A showing of adequate financial resources may be required but will not alone determine whether a bidder is competent to undertake the proposed work.
Only manufacturers or contractors of established reputation, or their duly authorized dealers or agency, having proper facilities for the manufacture of the materials or equipment and for servicing same, or for proper execution of the work called for in the contract, will be considered in making the award.
1-7.6 Execution of Contract. A bidder whose proposal is accepted shall properly sign a written contract with the Agency on the form attached hereto and return said contract together with good and approved bonds and insurance certificates as required by the Contract Documents within twenty-one (21) calendar days from the date of the mailing of a notice from the Agency to the bidder, according to the address given by him, of acceptance of his proposal.
Contract bonds and certificates of insurance, if required, shall be filed in all instances before delivering any equipment, materials, or performing any work under the contract; also before any purchase order shall be issued. An executed Power of Attorney form shall be submitted with all contract bonds herein specified.
If a bidder whose proposal is accepted fails or refuses to enter into a contract as herein provided, or to conform to any stipulated requirement in connection therewith, the money represented by his check or bidder’s bond shall be refunded less the difference between the low bid and the bid of the bidder with whom the Agency enters into an agreement in accordance with the provisions of the Public Contracts Code Section 20174. At the discretion of the Agency, an award may be made to the bidder whose proposal is next most acceptable to the Agency, and such bidder and his surety shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made.
A corporation to which an award is made may be required before the contract is finally signed to furnish evidence of its corporate existence, of its right to do business in California and of the authority of the officer signing the contract and bonds for the corporation to so sign. 1-7.7 Return of Proposal and Guarantee. The check or bond of a bidder to whom the contract has been awarded will be returned to him after all of the acts, for the performance of which said security is required, have been fully performed. The checks or bid bonds of the second and third lowest bidders will be returned when the bidder to whom the contract has been awarded has properly executed all of the required Contract Documents. Check or bid bonds of other bidders will be returned when their proposals are rejected or in any event at the expiration of forty-five (45) days from the date of opening bids.
1-7.8 Precedence of Contract Documents. The order of precedence of contract document shall be:
FIRST Requirements of law, including the Code and Ordinances of the City of Gardena.
SECOND Permits from other agencies as may be required by law.
THIRD Permits from City of Gardena Departments as may be required by law or ordinance.
FOURTH The Contract.
GP-5
FIFTH The Bid Proposal.
SIXTH Addenda.
SEVENTH Notice Inviting Bids.
EIGHTH Instructions to Bidders.
NINTH Technical Provisions.
TENTH Plans.
ELEVENTH General Provisions of the Standard Specifications.
TWELFTH Standard Plans.
THIRTEENTH Standard Specifications for Public Works Construction (current edition).
FOURTEENTH Caltrans Standard Plans and Specifications.
FIFTEENTH Reference Specifications.
Change orders, supplemental agreements and approved revisions to Plans and Specifications will take precedence over documents listed above, except those listed as FIRST, SECOND and THIRD. Detailed plans shall have precedence over general plans.
SECTION 2 – SCOPE OF THE WORK
2-2 PERMITS. The Contractor will obtain, at no cost to the Agency, all permits necessary to perform the work on streets, highways, railways or other rights-of-ways. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to those permits required for night work, overload, blasting and demolition. For private contracts, the Contractor shall obtain all permits incidental to the work or made necessary by its operations, and pay all costs incurred by the permit requirements.
The Contractor and each subcontractor employed upon the work must have or obtain a valid City of Gardena Business License in accordance with the provisions of the Gardena Municipal Code.
The Contractor’s attention is directed to the following permits and respective contact personnel for each Agency:
Union Pacific Railroad (UPRR) Encroachment Permit. This work includes milling, overlay, and restriping of the pavement within the railroad right-of-way as depicted on sheets 5 and 13 of the project plans. This permit consists of the Contractor Endorsement and Consent Letter, which are contained in Appendix D of these specifications. The contractor will be required to obtain a rider to the City’s permit from UPRR. o Union Pacific Railroad
Nick Vineyard
Senior Public Project Manager
(916) 245-2514
(909) 222-5659
[email protected]
GP-6
Caltrans Encroachment Permit.
o Caltrans Encroachment Permit # 07-24-N-MC-0069. This work includes installing traffic loops for a Caltrans owned/maintained traffic signal as depicted on sheet 6 of the project plans. This permit is contained in Appendix E of these specifications. The contractor will be required to obtain a rider to the City’s permit from Caltrans.
Caltrans District 7
100 South Main Street, Suite 100, Los Angeles, CA 90012 (213) 897-3631
(213) 897-0420 FAX
[email protected]
o The contractor shall obtain a separate Caltrans Encroachment Permit for temporary traffic control within Caltrans right-of-way. Golden State Water Company Encroachment Permit. This work includes installing a new water meter as depicted on sheet 32 of the project plans. The contractor shall coordinate with Golden State Water Company for this permit. o Golden State Water Company
Michael Carbajal
(909) 394-2272
[email protected]
City of Torrance Encroachment Permit. This work includes temporary traffic control and restriping of the pavement within the City of Torrance right-of-way. The contractor shall coordinate with City of Torrance for this permit. o City of Torrance
Alex Chou
Associate Engineer
20500 Madrona Avenue, Torrance, CA 90503
(310) 618-3032
(310) 618-6902 FAX
[email protected]
The contractor shall adhere to requirements contained within these permits including, but not limited to, safety training, flagging requirements and coordination required. All costs associated with conforming to all requirements of these permits shall be included in the various items of work and no further compensation shall be allowed therefore.
2.10 DISPUTED WORK.
2.10.1 Retention of Imperfect Work. If any portion of the work done or materials furnished under the contract proves defective or not in accordance with the specifications and contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if the removal of such work is impracticable or will create conditions which are dangerous or undesirable in the opinion of the Engineer, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make deductions therefore in the payment of the contract item due Contractor as may be just and reasonable. 2-11. DISPUTE RESOLUTION.
2-11.1 Requests for Contract Adjustments and Relief. If either Contractor or the Agency believes that it is entitled to relief against the other for any event arising out of or related to the GP-7
work or Project, such party shall provide written notice to the other party of the basis for its claim for relief. Such notice shall, if possible, be made prior to incurring any cost or expense and in accordance with any specific notice requirements contained in the applicable sections of this Contract.
In the absence of any specific notice requirement, written notice shall be given within a reasonable time, not to exceed fourteen (14) days, after the occurrence giving rise to the claim for relief or after the claiming party reasonably should have recognized the event or condition giving rise to the request, whichever is later. Such notice shall include sufficient information to advise the other party of the circumstances giving rise to the claim for relief, the specific contractual adjustment or relief requested and the basis of such request. 2-11.2 Dispute Avoidance and Resolution. The parties are fully committed to working with each other throughout the Project and agree to communicate regularly with each other at all times so as to avoid or minimize disputes or disagreements. If disputes or disagreements do arise, Contractor and the Agency each commit to resolving such disputes or disagreements in an amicable, professional and expeditious manner so as to avoid unnecessary losses, delays and disruptions to the work under the Contract.
Contractor and the Agency will first attempt to resolve disputes or disagreements at the field level through discussions between Contractor’s Representative and the Engineer.
If a dispute or disagreement cannot be resolved through the Contractor’s Representative and the Engineer, Contractor’s Chief Executive Officer or similar senior representative and the Gardena City Manager, or designee, upon the request of the other party, shall meet as soon as conveniently possible, but in no case later than twenty (20) days after such a request is made, to attempt to resolve such dispute or disagreement. Prior to any meeting between the parties’ senior representatives, the parties will exchange relevant information that will assist the parties in resolving their dispute or disagreement.
If, after meeting, the senior representatives determine that the dispute or disagreement cannot be resolved on terms satisfactory to both parties, the parties may submit the dispute to binding or non-binding mediation. The mediation shall be conducted in any manner and by any person or mediation association mutually acceptable to the parties. 2-11.3 Arbitration. Any claims, disputes or controversies between the parties arising out of or relating to the Contract, or the breach thereof, which have not been resolved in accordance with the procedures set forth in Section 9-4.2 above may be decided by binding or non-binding arbitration. The arbitration shall be conducted in any manner and by any person or arbitration association mutually acceptable to the parties.
2-11.4 Claims Disputes. Any claims of Contractor, as “claims” are defined in California Public Contract Code Section 9204 shall be processed in accordance with that section. Section 9204 provides in relevant part that upon receiving a claim from a contractor, together with reasonable documentation to support the claim, a contracting public entity shall conduct a reasonable review of the claim and, within a period not to exceed 45 days [except as otherwise provided in Section 9204], shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed.
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, Section 9-4.3 shall apply. If the contractor disputes the public entity’s written response, or if the public entity fails to respond to a claim within the time prescribed, the contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.
GP-8
Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed.
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the contractor sharing the associated costs equally. The public entity and contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to other applicable procedures.
2-13 DRAWINGS AND SPECIFICATIONS (“RECORD” DRAWINGS). At all times, the Contractor shall maintain at the project a “Record” set of Drawings and Specifications to include all executed addenda, change orders, and field orders.
Prior to each progress payment the Contractor shall deliver to the Engineer, a set of contract drawings with all applicable “as constructed” notes placed/recorded thereon. Failure to provide “as constructed” plans will cause progress payment to be withheld until information is provided to City.
After completion of the work and before final payment, the Contractor shall deliver to the Engineer a complete set of contract drawings with all applicable “as constructed” noted placed/record thereon. The final form and detail of these as constructed plans are subject to the acceptance of the Engineer.
2-14 MARKING REMOVAL. All markings placed by the Contractor, City, and Underground Service Alert (USA) during construction shall be removed at the completion of the work. These markings shall include, but not limited to, paint, stakes, and metal tags.
All cost associated with removal of markings shall be included in the bid prices for the applicable bid items. Failure of the Contractor to remove these markings shall be cause for the City to do the work and withhold the costs from the Contractor’s final payment.
SECTION 3 – CONTROL OF THE WORK
3-5 INSPECTION. Inspection shall be made once a day for areas ready for inspection. Areas or items that fail inspection or that are not ready for inspection shall be rescheduled by the contractor.
Inspection of the work shall not relieve the contractor of the obligation to fulfill all conditions and requirements of the contract.
3-6 THE CONTRACTOR’S REPRESENATIVE. The Contractor shall furnish the Engineer with the name, address and cell/ business/home telephone numbers of the person responsible for the maintenance of barricades, traffic control signs, lights and other safety devices.
GP-9
3-10 SURVEYING.
3-10.3 Line and Grade. Unless otherwise provided in the Technical Provisions, establishing lines and grades for construction shall be the responsibility of the Contractor, with the following provisions:
All work under this contract shall be built in accordance with the lines and grades shown on the plans. Field survey for establishing these, and for the control of construction, shall be the responsibility of the Contractor. All such surveys, including construction staking, shall be performed on all items ordinarily requiring grade and alignment, at intervals normally accepted by the agencies and trade involved.
The Contractor shall provide a copy of the office calculations and grade sheets to the Agency’s Inspector. The Contractor shall be responsible for any error in the finished work, and shall notify the Engineer within 24 hours of any discrepancies or design errors discovered during staking.
Unless a separate bid item is provided, the payment for surveying, construction staking, professional services, office calculations, furnishing all labor, materials, equipment, tools and incidentals, and for doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed therefore. 3-12 WORK SITE MAINTENANCE.
3-12.1 General. The Contractor shall keep the work site clean and free from rubbish and debris.
The Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling with water in keeping with the AQMD and NPDES requirements. Debris, soil or other matter shall not be washed into storm drains but shall be collected and disposed of in a legal, responsible manner.
The construction area shall be cleaned with a power sweeper at the end of every workday and when deemed necessary by the Engineer.
The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Use temporary sandbags to control the site perimeter. At the completion of the project sandbags shall become the property of the City of Gardena and shall be remain in place.
The Contractor shall not spill on haul routes. Any such spillage shall be removed immediately and the area cleaned.
Stockpiling of construction materials or debris on City right-of-way shall be in accordance with the NPDES permit and shall be approved by the inspector. At the completion of work, the Contractor shall thoroughly clean all work areas.
3-12.2 Air Pollution and Surface Maintenance Control. The Contractor shall obtain a construction water meter from Golden State Water including required deposit and fees. The Contractor shall pay for the water used, at the current water rates. All arrangements for construction water shall be made by contractor with Golden State Water at Contractor expense. 3-12.4. Storage of Equipment and Material.
3-12.4.1 General. All costs associated with the disposal of all excavated or demolition materials, including any gate fees, shall be paid by the Contractor. These costs shall be included in the bid price for the applicable bid items.
GP-10
Prior to any excavated or demolition material being removed from the construction site the Contractor shall notify the City as to the hauling route and destination for disposal. If the location for disposal is other than a county landfill then the Contractor shall provide the City with written permission and release of liability for the City from the owner of the property where the material will be deposited.
The City has an exclusive agreement with Waste Resources, Inc. and no other firm may provide bulk trash bins in the event the work requires this service. 3-12.4.2 Storage in Public Streets. Construction equipment shall not be stored at the construction site, any public street or publicly owned facilities without approval of the City.
Contractor shall store equipment at a contractor’s rental yard.
All excavated material that is to be hauled to and disposed of at a County landfill site by the Contractor is subject to a County gate fee based on tonnage. 3-12.5.4 Protection and Restoration of Existing Improvements. Any facilities, structures, water lines, landscaping, surfaces, signs, pavement markings, painted curbs, house numbers, etc., which are damaged during construction shall be restored to the satisfaction of the City. Damaged water lines shall be repaired immediately at no additional cost to the city. 3-12.5.5 Access to Private Property. The Contractor shall be aware that business and residential access must be maintained at all times. The Contractor shall schedule operations to minimize interference with access to private property.
The main access way to any business or home shall not be completely blocked for more than one four-hour period a day except blockage shall be limited to one twenty-four (24) hour period when concrete is poured.
Temporary access ways shall be provided from the street to the main access way of all businesses and homes by use of traffic rated steel plates or any other method approved by the city.
Payment for this item shall be included in the applicable contract work item. 3-13 COMPLETION, ACEPTANCE, AND WARRANTY.
3-13.3 Warranty. In addition to the guarantees as required in Section 1-7.2 and 3-13.3 of the Standard Specifications, the Faithful Performance Bond shall remain in full force and effect for a period of one year after acceptance of the work by the Agency to insure that defects, which may appear within said period, will be repaired, replaced, or corrected by the Contractor, at his own cost and expense, to the satisfaction of the Engineer within thirty (30) days after written notice thereof by the Agency.
SECTION 4 – CONTROL OF MATERIAL
4-1 GENERAL.
4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier.
The Contractor warrants clear and good title to all materials, supplies and equipment installed and incorporated in the work, and agrees upon completion of all work to deliver the premises, GP-11
together with all improvements and appurtenances constructed or placed thereon by him to the Agency free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon; provided, that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this section, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Agency.
The provisions of this section shall be inserted in all subcontractor’s and material contracts, and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into regarding such materials.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBLITIES
5-4 INSURANCE. In lieu of Section 5-4 of the Standard Specifications, refer to the City Contract Documents Section, CD-10, for detail requirements. 5-5 ANTITRUST CLAIMS. By entry into this Contract, Contractor hereby acknowledges the terms of Section 7103.5 of the Public Contract Code and hereby offers and agrees to assign to the Agency all rights, title and interest in all causes of action it may have as outlined above. 5-7 SAFETY.
5-7.4 Hazardous Substances. As required by Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify the Agency of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by the Agency; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, the Agency shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all work to be performed under the Contract but shall retain all rights provided by the Contract and by law for making protests and resolving the dispute. 5-7.4.1Edison Energized Conductors. Contractor hereby promises and agrees that in the performance of the work specified in this Contract, it will employ and utilized only qualified persons, as hereinafter defined, to work in proximity to Edison’s secondary, primary and transmission facilities. The term “qualified person” is defined in Title 8, California Administrative Code, Section 2700, as follows:
“Qualified Person: A person who by reason of experience or instruction is familiar with the operation to be performed and the hazards involved.” Contractor further promises and agrees that the provisions of this section shall be and are binding upon any subcontractor or subcontractors that may be retained by it, and that Contractor shall take such steps as are necessary to assure compliance by said subcontractor or subcontractors with the requirements of this section. 5-7.4.2 Emergency Provisions. Unusual conditions may arise on the work which will require GP-12
that immediate and unusual provision be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.
Whenever, in the opinion of the Agency, an emergency exists of which the Agency is aware and against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by the progress of construction; and whenever, in the opinion of the Agency, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the Contract, then in that event the Agency may provide suitable protection to said interests by causing such work to be done and material to be furnished, as in the opinion of the Agency may seem reasonable and necessary, all at the expense of the Contractor.
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule. The Contractor’s proposed construction schedule shall be submitted to the Engineer within fourteen (14) calendar days after receipt of written City approval of promised delivery date per Notice to Proceed for Equipment and Materials Procurement provisions on page GP-1. The Contractor shall provide an updated construction schedule, if changes are necessary, within fourteen (14) calendar days after receipt of written City approval of the delivery commitment/schedule per Notice to Proceed for Construction provisions on page GP-1. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.
The Contractor shall include in his bid all costs to perform the work under this contract in stages.
The Contractor shall begin and complete work in each stage prior to starting work in subsequent stages unless previous permission is obtained from the Engineer. The contractor shall stage the work to allow parking on the next adjacent streets. Restricting parking on multiple adjoining streets shall require approval of the engineer.
6-1.2 Commencement of the Work. See page GP-1 for provisions of the Notice to Proceed.
Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods and clarify inspection procedures.
The names, addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Public Works Manager and the County Sheriff’s Department or the City Police Department prior to beginning work.
The Contractor shall also notify the City of Gardena and the owners of all utilities and substructures within the Project area not less than 48 hours prior to starting construction. The following utility companies list of names and telephone numbers is intended for the convenience of the contractor and is not guaranteed to be complete or correct:
COMPANY CONTACT TELEPHONE NO.
Southern California Edison Manuel Migueles 310.720.6086 Southern California Gas Aaron Cun 213.231.3270
Golden State Water Co. Michael Carbajal 909.394.2272
GP-13
AT&T Cathy Hurtado 510.645.2929
L.A. Dept. of Water and
Power Underground Substructure Design 213.367.2659
L.A. Sanitation District Engineering Counter 562.908.4288 TPx Communication Mark Denning 949.864.0296
Verizon ASG Investigations Team 732.335.5588
California Water Service Frank Scotty 310.257.1400
City of L.A. City Representative 213.847.1498
CenturyLink Area Representative 877.366.8344
Zayo Group George Huss 443.403.2023
Crown Castle Fiber Dig Team 888.632.0931
City of Torrance Water
Department Alan Berndt 310.618.2916
West Basin Municipal Water
District Frank Fuchs 310.217.2411
The Contractor shall submit periodic Progress reports to the Engineer by the tenth day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-1.3 Working Day. The Contractor’s working hours shall be limited to the hours between 7:30 A.M. and 4:30 P.M., Monday through Friday except holidays. Deviation from normal working hours will not be allowed unless written permission has been duly obtained beforehand from the office of the City Engineer. The Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and the public, and for proper inspection.
The Contractor shall perform nighttime paving with working hours between 8:00 P.M. and 5:00 A.M. Monday through Friday except holidays.
If the Contractor works beyond the allowed working hours without prior written approval from the Engineer, the Contractor may be charged Five Hundred ($500) for each occurrence as required by the Engineer. The amount will be deducted from a progress payment or bond.
Contractor hereby acknowledges and shall be required to comply with the provisions of California Labor Code Section 1810 et seq. According to those sections, eight (8) hours of labor shall constitute a legal day’s work. Contractor shall pay to the Agency a penalty of Twenty-Five Dollars ($25.00) for each worker employed in the execution of this Contract by Contractor, or by any Subcontractor, for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day or forty (40) hours in any one (1) calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.
In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead and travel time. The service fees will be deducted from any amounts due to the Contractor.
6-1.4 Notice and Service Thereof. Any notice required or given by one party to the other under the contract shall be in writing and shall be dated and signed by the party giving such GP-14
notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:
Notice shall be given to the Agency by personal delivery thereof to the City of Gardena Engineer or by depositing the same in the United States mail enclosed in a sealed envelope, registered and with postage prepaid, addressed to:
Public Works Department
City of Gardena
1717 W. 162nd Street
Gardena, CA 90247-3778
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the site of the project, or by depositing the same in the United States mail, enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of the work under this Contract, postage prepaid and registered.
Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated to the party giving the notice, postage prepaid and registered.
Notification of Property Owners and Tenants - The Contractor shall provide minimum two notices to each property owner and/or tenant in the project area. First notice shall be provided in writing one month prior to the start of construction. Second notice shall be provided in writing ten (10) working days prior to the start of construction. Each notice shall include a flyer with a vicinity map of the project area. The City will provide a sample flyer to the Contractor. If pedestrian or vehicular access to private property is to be blocked, the Contractor shall again notify each property owner and/or tenant in writing ten (10) working days prior to construction activities. The Contractor shall provide additional notices when a lapse time occurs during each phase/segment work.
The written notice shall be submitted to the Engineer for approval prior to being delivered.
6-2 PROSECUTION OF THE WORK.
6-2.1 Contractor’s Responsibility for Work. Until the formal acceptance of the work by the Agency, the Contractor shall have the charge and care thereof and shall, subject to the insurance protection furnished in accordance with the Section 1-7.6 and 5-4 hereof, bear the risk of accident, loss or damage to any part thereof by action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore and otherwise correct damages to any portion of the work occasioned by any of the above causes before its acceptance.
In case of suspension of work from any cause whatever, the Contractor shall be responsible for all materials and the proper temporary storage thereof. 6-3 TIME OF COMPLETION.
6-3.1 General. The contract time shall begin per the City’s written notification. Work must be completed within working days specified for the project. In addition, the Contractor shall notify the City 24 hours in advance of the actual commencement of work.
No work shall be undertaken during the City’s holiday closures. It is the Contractor’s GP-15
responsibility to determine the City’s closure dates.
6-9 LIQUDATED DAMAGES. The amount of liquidated damages is hereby amended to $5,000 for each consecutive calendar day.
SECTION 7 – MEASUREMENT AND PAYMENT
7-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK.
7-1.2 Method of Measure. The quantities shown on the Bid Schedule are approximate only. The Contractor will be paid for the actual quantities of work based on approved field measurements as provided for in these Specifications. The City reserves the right to increase or decrease the amount of any item or portion of work to be performed or materials furnished, or to delete any item, in accordance with the Specifications. Additional bid item work shall be completed within the total working days in these specifications. Additional working days maybe allowed with the approval of the engineer.
7-3 PAYMENT.
7-3.2 Partial and Final Payment. The closure date for periodic progress payments will be the twenty-fifth day of each month. Authorization to pay is commonly received on the tenth day of the following month. However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents.
7-3.3 Delivered Materials. The City will NOT honor or make any progress payments for materials ordered and delivered to the job site by the Contractor unless prior approval is obtained from the Engineer.
7-3.4 MOBILIZATION. Mobilization will be amended to Mobilization / Demobilization and shall not exceed 5% of the total overall bid for the project. Mobilization will be paid at 50% at the beginning of construction and the remaining Demobilization will be paid as a percentage of work completed for the various items of work.
Mobilization shall include preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site for the establishment of all facilities necessary for work on the project and for all other work and operations which must be performed or costs incurred prior to beginning work on various Contract items on the project.
Demobilization shall include all work and operations necessary to perform final clean-up, moving personnel, equipment, supplies, and incidentals from the project site, removing all offices and other facilities that were necessary for work on the project, and all other work that must be performed or costs incurred prior to final acceptance of the work.
The Contractor shall promptly demobilize equipment no longer needed to perform the work.
All facilities (equipment, materials, etc.) required for Contractor’s use shall be furnished and maintained by the Contractor at the locations designated on the Contract Drawings or as directed by the Engineer. The City does not permit storage of Contractor facilities (equipment, materials, etc.) in street right of way during non-working hours.
The Contractor shall furnish and maintain adequate number of portable sanitary facilities throughout the project duration for use by their own personnel and Subcontractors.
GP-16
The security of all materials and equipment in the Contractor storage area shall be the responsibility of the Contractor. The City of Gardena is not liable for any theft or damage to materials or equipment in Contractor’s storage area.
Payment for Mobilization / Demobilization shall be at the Contract Lump Sum price and shall include full compensation for all labor, equipment and materials to construct the work complete in place including but not limited to obtaining all applicable certifications necessary for specialty personnel and major equipment in conformance with Subsection 2-2, and all other applicable permits; securing a storage yard to store all equipment and materials to be used on the job, disposal of waste materials, restoration of the site, etc. The storage yard may also be used as a temporary storage for excavated materials, and traffic control items. Costs for mobilization/ demobilization shall be included in the unit price bid for Mobilization, payment will be made based on percentage of project completion.
7-4 PAYMENT FOR EXTRA WORK.
7-4.3 EXTRA WORK. When work is performed on a "time and materials" basis, the following percentages shall be added to the Contractor's cost and shall constitute the markup for all overhead and profits:
1) Labor ......................................................... 20 2) Materials ......................................................... 15 3) Equipment Rental ....................................................... 15 4) Other Items and Expenditures .................................... 15 To the sum of the costs and markups provided for in this section, 1 percent shall be added as compensation for bonding.
When all or any part of the extra work is performed by a Subcontractor, the markup established above shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
END OF GENERAL PROVISIONS
TP-1
TECHNICAL PROVISIONS
PREFACE: All work and materials shall conform to the "Standard Specification for Public Works Construction", 2021 edition, except as modified by the contract and these Technical Provisions.
Incidental Work - All work and materials required by the plans and specifications, and not specifically listed in the bid schedule items of work, shall be considered incidental and no additional payment shall be made therefore. Incidental items shall include, but not be limited to, implementation of the water pollution control and Best Management Practices for the protection of storm drain structures; saw cutting; excavation and disposal of materials; survey; and coordination of utilities.
PART 2 – CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIALS
200-2. UNTREATED BASE MATERIAL
200-2.1 General. The Contractor shall furnish Certified Weight Tickets for material delivered to the job site and deliver it to the Engineer or his representative before the end of the working day.
The City may hire a qualified soils engineer to perform all tests. If the material furnished by the Contractor fails any tests, the Contractor shall remove said material and shall complete the construction of the base with material acceptable to the Engineer at no extra cost to the City.
Costs for base material shall be incidental and included in the bid item of work for which it is required, and no additional payment will be allowed therefore.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1.2 Concrete Specified by Class and Alternate Class. Concrete shall be 520-C-2500 for curb-gutter, curb ramps, and sidewalk. Curing compound shall be Type 2 (if required).
SECTION 203 – BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE.
Asphalt concrete shall be Type B-PG-64-10 for base course. 203-11 ASPHALT RUBBER HOT MIX (ARHM).
230-11.3 Composition and Grading. Asphalt-Rubber shall be Class ARHM-GG-C, (PG-64-16) Standard Specifications Section 203-11 Wet Process and Section 302-9.
TP-2
SECTION 214 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND
PAVEMENT MARKERS
Delete the entire Section 214 and replace with Section 81 and 84 of the latest edition of the Caltrans Standard Specifications and as modified by these Technical Provisions.
SECTION 84 - MARKINGS
84.2.03A General.
Any and all new striping, pavement markings and legends shall be cat-tracked and approved by the Engineer prior to final installation. A minimum of three (3) working days’ notice must be provided to the Engineer for approval prior to final installation. The Engineer will inspect the cattracking within 2 working days and notify the Contractor of any needed corrections or adjustments.
Upon approval of the cat-tracking by the Engineer, the Contractor shall then complete the installation of all new striping, pavement markings and legends no later than 5 working days following the approval of cat-tracking.
APPLICATION
The Contractor shall install all traffic striping, pavement markings and curb paint on all streets no earlier than one (1) week and no longer than two (2) weeks after paving work is complete. All pavement striping, curb paint, markings, and legends on PCC surfaces shall be installed with (2) two coats of paint. All pavement striping, curb paint, markings, and legends on AC surfaces will receive thermoplastic application of striping, marking and legends. All pavement striping, curb paint, markings, and legends shall be coated with reflective beads meeting Caltrans requirements and shown on Caltrans approved materials listed.
All pavement striping, markings, legends and curb paint shall match the plans, unless otherwise directed by the Engineer. PCC surfaces will receive paint application, while AC surfaces will receive thermoplastic. Any pavement striping, markings, and legends that do not match the plan shall be corrected by the Contractor, to the satisfaction of the Engineer, no more than two (2) working days after receiving notification. All associated removals and installations, necessary to complete the work, shall be performed as outlined in these Technical Provisions per the lump sum price, and no separate compensation will be allowed therefore.
Existing thermoplastic and/or painted pavement striping, markings, and legends outside of the Work area shall be protected in place by the Contractor, unless otherwise directed by the Engineer.
Contractor shall not proceed with the installation of any pavement striping, markings, and/or legends until after the Engineer has inspected and approved the required “cat-tracking”, and has authorized the Contractor to proceed with said work. After completion of layout, the Contractor shall notify the Engineer, and allow for a minimum of two (2) business days after notification, for the Engineer to inspect the layout.
Contractor shall not proceed with the installation of striping, markings or legends until after the Engineer has inspected and approved the required layout, and has authorized the Contractor to proceed with said Work.
“Cat-track” marks shall be made in chalk and/or discreet marking paint only. “Striping” paint for the purpose of cat-tracking is prohibited.
Reflective pavement markers shall be placed on a location as established by the applicable Caltrans striping detail noted on the approved striping Plan, which includes, but is not limited to temporary painted line, new striping or existing striping. There shall be one marker for each location. All work necessary to establish satisfactory locations for markers shall be performed by TP-3
the Contractor. Markers shall be Retroreflective Abrasion Resistant Apex model 921 or 921AR or equivalent, as approved by the Engineer.
Paint material for all pavement striping, markings and legends shall conform to the provisions in Section 84, “Traffic Stripes and Pavement Markings,” of the State of California Department of Transportation (Caltrans) Standard Specifications, latest edition, and these Technical Provisions.
Stencils used to paint pavement markings must conform to the latest Caltrans approved Stenciling Standards. Add to Subsection 84-1.04, “Protection from Damage,” of the Caltrans Standard Specifications, the following: Newly placed traffic stripes and pavement markings, which are damaged as a result of the construction work, and public vehicular and pedestrian traffic, shall be repainted to the satisfaction of the Engineer. All associated removals and installations, necessary to complete the work, shall be performed as outlined in these Technical Provisions at the sole expense of the Contractor, and no separate compensation will be allowed therefore.
84.2.03C(1) General. Delete the third paragraph:
84.2.03C(3)( a) General [Eighth paragraph, remove the second sentence and add the following]:
The 2nd coat of paint shall be applied seven (7) calendar days following the application of the 1st coat.
84-2.04 PAYMENT Delete the entire section and replace with the following:
Payment for painting of striping, installation of thermoplastic striping, installation of markings and installation of raised pavement markers will be at the contract unit price per Lump Sum for SIGNING, PAVEMENT MARKINGS, AND STRIPING shall include full compensation for all labor, equipment and materials to construct the work complete in place and no additional compensation will be allowed therefore.
84-9.01 General
REMOVALS
Prior to placing pavement, the Contractor shall remove all existing conflicting pavement markings within the work limits.
Upon completion of street resurfacing the Contractor shall immediately install temporary pavement markers (slurry tabs).
Slurry tabs shall be maintained daily. Missing or damaged tabs shall be replaced each day of construction, prior to striping.
The Contractor shall furnish and install traffic delineation and markings using paint "Cat Tracking,” temporary marking tape, removable reflective tabs, or other approved media on the same working day as existing stripes and legends are lost, including but not limited to stop bars, lane lines, and crosswalks to match new markings.
PENALTIES FOR NONCOMPLIANCE:
$500 for each day slurry tabs/cat-tracking are not maintained to the satisfaction of the City.
The Contractor shall remark any markings that are partially or completely covered, including but not limited to striping, stop bars, crosswalks, wording, and symbols. Legends shall include but not TP-4
be limited to the following: STOP, STOP AHEAD, ONLY, ARROWS, SIGNAL AHEAD, SLOW SCHOOL XING, BIKE LANE, and BIKE PATH.
All work and materials shall conform to the requirements of the Caltrans Standard Specifications, latest edition, and the latest edition of the Caltrans Traffic Manual.
SECTION 215 – SIGNS AND MARKERS
Insert entire Section 82 of the latest edition of the Caltrans Standard Specifications.
SECTION 82 – SIGNS AND MARKERS
82-2 SIGN PANELS
82-2.02 MATERIALS
82-2.02A General
Description - This work shall replace existing sign posts, install new posts, reinstall existing signs, and install new signs as shown per plan.
The Contractor shall replace damaged and/or faded traffic signs and install new signs per the minimum requirements of California MUTCD, latest edition and these specifications. The signing work under this Contract consists of the installation of traffic signs and posts, and all appurtenant work thereto necessary for the proper construction of the contemplated improvements, in accordance with the Plans and Specifications.
Signing: Signing shall be in accordance with Caltrans Standard Specifications Section 56-2 and the California MUTCD, except as modified or supplemented herein. a) Post-mounted traffic signs shall be installed on “Unistrut” 2” galvanized square steel tubing with an anchor sleeve/breakaway base support, or approved equal. b) Signs to be installed on existing street light poles shall be installed using ¾” stainless steel banding straps, buckles, brackets, bolt and washer.
c) All permanent signs shall be reflectorized using 3M high intensity grade sheeting for post mounted signs and 3M Diamond Grade sheeting for mast arm mounted non-illuminated street name signs. Sign material shall be 0.10-inch thick sheet aluminum, alloy 6061-T6 or alloy 5052- H36 or H38 and be manufactured in accordance with the California Manual of Uniform Traffic Control Devices (California MUTCD), latest edition.
d) New signs shall be installed using new metal posts set at a minimum of 30-inch depth in a minimum 12-inch square PCC, except as specified otherwise. e) The length of the metal post shall be sufficient to extend from the top of the sign to 30- inches below the top of the concrete footing and provide a 7-foot clearance between the finished grade and the bottom of the sign. The depth of the concrete footings shall be sufficient to extend at least 6-inches below the bottom of the posts.
f) ¼ inch expansion paper shall be placed between the sign foundation and sidewalk where applicable.
g) Sign installations shall be in compliance with, and provide the minimum clearances required by the Americans with Disabilities Act.
TP-5
Upon installation of a new sign post, the Contractor shall install new sign(s), reinstall existing sign(s), or relocate existing sign(s) as noted per plan.
Removal and disposal of old signs and signs posts shall be considered incidental, and no additional payment will be allowed.
Delete first sentence of third paragraph and add the following:
1. Phrase Property of the City of Gardena
82-3.02B Metal Posts
Mounting for roadside sign shall be on Telspar, or approved equal, perforated metal posts. Posts shall be 14 gauge, 2.00” x 2.00”, 12 feet in length (or more for multiple signs) and mounted on break-away sleeves.
82-3.04 Payment
Payment for installation of replacement signs will be included in the contract unit price per Lump Sum for SIGNING, PAVEMENT MARKINGS, AND STRIPING shall include full compensation for all labor, equipment and materials to construct the work complete in place and no additional compensation will be allowed therefore.
PART 3 – CONSTRUCTION METHODS
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1. General. The following items of work are included under CLEARING AND GRUBBING:
A. Provide clean topsoil and grading of parkways as directed by the Engineer to restore the parkway grades.
B. Replacement of damaged pipe curb drain, as well as the coring and/or reinstatement of pipe curb drains.
C. Protection of fences adjacent to and within the public right-of-way.
D. Relocation of existing signs and warning devices.
E. Painting new and repainting existing curb markings such as yellow, blue, white, green or red curb as indicated in the plans or in these Technical Provisions.
F. Removal of all existing median landscaping, including shrubs and groundcover.
G. Protect existing private/public irrigation systems, and repair irrigation systems damaged during construction. See sprinkler/irrigation systems and landscaping repair section for additional clarification of contractor responsibility.
H. Protection of all existing improvements (public or private), unless shown to be removed/relocated/adjusted as part of the construction. The Contractor shall repair or TP-6
replace these items if damaged with new materials equal to the original or better, as required by the Engineer.
I. Protection of all utilities, walls, fences, hedges, buildings, concrete slabs, planters, and other private or public improvements not specifically shown to be removed as part of the construction. The Contractor shall replace these items, if damaged, with new material equal to the original or better, as required by the Engineer. 300-2 UNCLASSIFIED EXCAVATION
300-2.2.1 General All existing improvements, including those on private property, shall be protected in place. Any damage to and removal of these improvements shall be repaired and replaced by the Contractor at his expense.
All excavated material shall be immediately hauled away and disposed of outside the project limits. The Contractor shall be responsible for all damages and claims that may arise as a result of this disposal.
300-12 EXCAVATION. Roadway excavation shall include sawcutting, excavating, removing, hauling, and disposing of all soil materials, existing asphaltic concrete pavement, PCC pavement, subgrade and similar appurtenances which are to be removed for construction of the street reconstruction as shown on the Plans. Earthwork, subgrade preparation and finishing roadway shall confirm to the applicable requirements of Section 300 and 301 and other pertinent sections of the Standard Specifications for the various items involved. Payment for excavation shall be incidental and included in the appropriate unit price bid. 300-12.1 Asphalt Pavement Removal. The edges of asphalt pavement remaining in place shall be sawcut and shall have clean, solid vertical faces. The edges of asphalt pavement broken during construction shall be resawn and removed before surfacing material is placed at the expense of the Contractor.
All edges shall be parallel or perpendicular to curb faces except cuts around objects shall be on a curvilinear cut, a maximum 4 inches departure from the straight cut every 2 feet.
Payment for asphalt pavement removal shall be included in the Contract Unit price per Ton for CONSTRUCT AC DIGOUT / RECONSTRUCTION (10” THICK) and shall include full compensation for all labor, equipment and materials including sawcutting, excavating, removing, hauling, and disposing of existing asphaltic concrete pavement to construct the work complete in place and no additional compensation will be allowed therefore.
Payment for median asphalt removal shall be included in the Contract Unit price per Lump Sum for LANDSCAPE IMPROVEMENTS and no additional compensation will be allowed therefore. 300-12.2 Concrete Removal. Concrete to be removed shall be sawcut to a minimum depth of 5 inches at score marks or as marked by the City. Sawed edges, broken or chipped during construction shall be resawn at the contractor's expense. Increase in concrete quantity due to resawing shall not be considered for payment. Upon concrete removal, the City Parks Superintendent shall be informed to check and approve all roots to be removed. If he determines the tree cannot be saved, removal and planting of a new tree shall be per unit cost. tree shall be per unit cost.
All edges shall be parallel or perpendicular to curb faces except cuts around objects shall be on a curvilinear cut, a maximum of 4 inches departure from the straight cut within every 2 feet. The TP-7
edges of Portland cement concrete remaining in place shall be sawcut and shall have clean, solid vertical faces.
Concrete removed shall be replaced within five (5) days after removal. All restorations shall be completed a maximum of five (5) days after concrete placement (i.e. backfill, grading of dirt, asphalt repave etc.) One Hundred ($100) dollars per calendar day and location shall be charged to the Contractor for failure to comply with the above schedule as required by the Engineer.
SECTION 302 – ROADWAY SURFACING
302-1 CRACK SEALING AND PAVEMENT PREPARATION.
Existing pavement cracks, joints, spalls and cracks around utility patches, shall be sealed as follows:
Cracks, Joint Widths Required Sealing Method
1/4 " to 1/2 " Rout to 1/2" wide, 1/2 " deep
Fill with Sealant*
1/2" to 3/4" Fill with sealant*
Greater than 3/4" Fill with hot mix asphalt paving (F-AR4000) * Use Type "D" joint sealant to seal P.C.C. to be overlaid with asphalt use Type "A" sealant (color to match existing P.C.C.) in P.C.C., which is not to be overlaid.
All loose material shall be removed from cracks and joints and an approved herbicide shall be applied prior to sealing.
Cracks shall be filled flush with the road surface. Excess material shall be removed.
Sealant shall be applied according to the manufacturer's specifications, which shall be furnished to the Engineer at the preconstruction job meeting.
302-5 ASPHALT CONCRETE (AC) PAVEMENT.
302-5.1 General. The Contractor shall establish designated asphalt truck routes and staging areas and shall communicate these routes and areas to truck drivers prior to the arrival at the job site.
This plan must be approved by the Engineer five (5) days prior to paving. 302-5.3 Prime Coat. Prime coat shall be applied to all subgrade surfaces prior to asphalt hot mix surfacing. The prime coat shall be Grade SC-250 liquid asphalt uniformity per Green Book requirements.
302-5.4 Tack Coat. Asphalt tack coat shall be applied to all existing asphalt surfaces prior to asphalt overlay.
Existing surfaces shall be cleaned utilizing a power sweeper and free of water prior to applying PG 64-10 or SS-1h asphalt tack coat per Green Book requirements. Tack coat shall uniformly cover all areas to be paved.
TP-8
302-5.5 Distribution and Spreading.
BOTTOM DUMPING OF ASPHALT PAVING SHALL NOT BE ALLOWED.
302.5.6.2 Density and Smoothness. Failed areas shall be removed and replaced at Contractor's expense.
302-5.7 Joints. COLD JOINTS SHALL NOT BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. COLD JOINTS PLACED WITHOUT APPROVAL SHALL BE REMOVED AT THE SOLE EXPENSE OF THE CONTRACTOR.
302-5.9 Payment. Payment for placing asphalt pavement shall be included in the Contract Unit price per Ton for CONSTRUCT AC DIGOUT / RECONSTRUCTION (10” THICK) and shall include full compensation for all labor, equipment and materials to construct the work complete in place including sawcut, removal, disposal, and no additional compensation will be allowed therefore. 302-9 ASPHALT RUBBER HOT MIX (ARHM).
302-9.1 General. The Contractor shall establish designated asphalt truck routes and staging areas and shall communicate these routes and areas to truck drivers prior to the arrival at the job site. This plan must be approved by the Engineer five (5) days prior to paving.
CONTRACTOR SHALL REMOVE ALL TRACKED ASPHALT MATERIALS FROM CONCRETE SURFACES AND RAISED PAVEMENT MARKERS.
302-9.3 Distribution and Spreading. Feather join edges shall be made along straight lines by hand raking out all heavy aggregates prior to rolling to produce a smooth uniform surface.
Compacted edge along gutter lip shall be 3/8 inch in height.
BOTTOM DUMPING OF ASPHALT PAVING SHALL NOT BE ALLOWED.
302-9.5 Joints. JOINTS SHALL NOT BE ALLLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. JOINTS PLACED WITHOUT APPROVAL SHALL BE REMOVED AT THE SOLE EXPENSE OF THE CONTRACTOR.
302-9.7 Rock Dust Blotter. Rock dust blotter shall be provided and uniformly applied using a mechanical spreader at a rate of approximately 1.65 kilogram per square meter. 302-9.9 Payment. Payment for CONSTRUCT 2” ASPHALT RUBBER HOT MIX SURFACE COURSE shall be per Contract Unit Price per Ton and shall be per thickness shown on the plans, based upon certified weigh master tickets. The unit price shall include all surface preparation, trackless tack coat, rock dust blotter, labor, tools, equipment, materials and incidentals to complete the work. No additional compensation will be allowed therefore. 302-15 ASPHALT TRACKING PAVEMENT AND MITIGATION. The purpose of this section is to address any tracking related problems caused by the Contractor. The City requires that all streets adjacent to the project remain track free during and after construction. Contractor shall prevent and mitigate asphalt tracking on all adjacent surfaces. The use of water or any other methods approved by the Engineer may be utilized. If tracking is present at the end of the work day, the Contractor shall use steam cleaning and a vacuum truck to remove tracking from all affected areas to the satisfaction of the Engineer.
TP-9
SECTION 303 – CONCRETE AND MASONRY CONSTRUCTION
303-5 CONCRETE CURBS, WALK, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, CURB RAMPS, AND DRIVEWAYS.
303-5.5.3 Walk. The Contractor shall regrade the area at the back of sidewalk where the new sidewalk is constructed at a different grade than existing sidewalk. The graded area shall have a maximum slope of 3:1 and 2% in City parkways. Fill material, if required, for this grading shall be furnished by the Contractor.
All existing asphalt concrete ramping adjacent to the new sidewalk shall be removed and disposed of by the Contractor.
303-5.5.5 Alley Intersections, Curb Ramps, and Driveways. The Contractor shall verify, with a “smart level”, that maximum ramp and sidewalk grades do not exceed maximum grades indicated on the project plans, when marking the required saw cut removal limits and when setting the concrete forms, prior to pouring any curb ramp locations. It shall be the Contractor’s responsibility to supervise and utilize the proper experienced personnel to ensure that the proper saw cut limits are established for all curb ramp locations and the Engineer shall not be responsible to direct the Contractor’s crews or otherwise serve in this management capacity. The Engineer shall be present to verify the concrete forms, prior to the Contractor pouring any PCC construction improvements for the curb ramp.
The Contractor shall be responsible to layout the proposed curb ramp to comply with the maximum grades indicated on the project plans. Limits of the new curb ramp shall be reviewed and approved by the Engineer prior to saw cutting. Typical construction tolerances to construct the new curb ramp shall not apply and maximum grades indicated on the project plans shall not be exceeded.
The Contractor shall be responsible to remove and reconstruct curb ramps at his own cost if ramps are deemed non-compliant with the project plans and these Technical Provisions.
Where the type of curb ramp includes a retaining curb at the back of curb ramp to make up for a difference in elevation between the existing grade and curb ramp grade, the construction of said retaining curb shall be considered as part of the curb ramp work.
All curb ramps shall be constructed of 4" thick concrete over 6" thick C.A.B.
Curb ramp limits shall be understood to be contained at a minimum within a radial line from the BCR (beginning of curb return) to a radial line at the ECR (end of curb return), and to be a minimum width as existing adjacent sidewalk width. In the event that an existing sidewalk joint be located three (3) feet or less to either radial line of the curb return, then the sidewalk panel from the radial line to that joint shall be replaced as well and shall be included in the cost of the curb ramp and no additional compensation will be allowed therefore. Curb ramp shall be poured separately from curb and gutter (min. 24 hrs after curb and gutter).
The curb ramp construction work shall include all related adjustments of pull boxes, pull box covers, and protection of traffic signal poles and signs that fall within the proposed curb ramp construction limits.
Special Note To Contractor:
Prior to constructing a curb ramp where physical site constraints do not allow the curb ramp construction to fully meet the requirements/standard plans as indicated on the project plans, the Contractor shall so notify the Engineer for direction in advance of construction.
TP-10
Detectable Warning Surface. Curb ramp detectable warning surface shall consist of raised truncated domes constructed or installed on curb ramps in conformance with the project plans and these Technical Provisions. The detectable warning surface shall be cast in place tactile tiles manufactured by Armor-Tile or approved equal. The color of the detectable warning surface shall be yellow conforming to Federal Color No. 33538.
The finished surfaces of the detectable warning surface shall be free from blemishes.
Submittals
A. Product Data: Submit manufacturer's literature describing products, installation procedures and routine maintenance.
B. Samples for Verification Purposes: Submit two (2) tile samples minimum 6" x 8" of the kind proposed for use.
C. Shop drawings are required for products specified showing fabrication details; composite structural system; plans of tile placement including joints, and material to be used as well as outlining installation materials and procedure.
D. Material Test Reports: Submit test reports from qualified independent testing laboratory indicating that materials proposed for use are in compliance with requirements and meet the properties indicated. All test reports shall be conducted on a cast-in-place tactile tile system as certified by a qualified independent testing laboratory.
E. Maintenance Instructions: Submit copies of manufacturer's specified maintenance practices for each type of tactile tile and accessory as required.
The manufacturer shall provide a written 5 year warranty for prefabricated detectable warning surfaces, guaranteeing replacement when there is defect in the dome shape, color fastness, sound on cane acoustic quality, resilience, or attachment. The warranty period shall begin upon acceptance of the contract.
303-5.9 Measurement and Payment.
Payment for REMOVE AND CONSTRUCT PCC 6” MEDIAN CURB, AND REMOVE AND CONSTRUCT CURB AND GUTTER shall be per the Contract Unit Price per Linear Foot and shall include full compensation for all labor, equipment, tools and materials to remove and construct the work complete in place, including sawcutting, root pruning, complete removal of underlying subgrade and base, subgrade preparation and compaction, removal or replacement of 2-feet wide asphalt hot mix paving (C2 PG64-10) over 6-inch thick C.A.B. adjacent to the curb and gutter, disposal, and no additional compensation will be allowed therefore.
Payment for REMOVE AND CONSTRUCT CONCRETE SIDEWALK, REMOVE AND
CONSTRUCT CONCRETE DRIVEWAY AND REMOVE AND CONSTRUCT PCC CROSS GUTTER PANEL shall be per the Contract Unit Price per Square Foot and shall include full compensation for all labor, equipment, tools and materials to remove and construct the work complete in place, including sawcutting, removal and construction of PCC joints as shown in the standard plans and construction details, protection of existing trees, parkway restoration, sleeving of drainage outlets through curb, and no additional compensation will be allowed therefore.
The unit bid price shall include all work necessary to complete the sidewalk reconstruction at each location including excavation.
TP-11
Payment for REMOVE AND RECONSTRUCT CONCRETE CURB RAMP shall be per the Contract Unit Price per Each and shall include full compensation for all labor, equipment, tools and materials to construct the work complete in place, including sawcutting, complete removal of underlying subgrade and base, subgrade preparation and compaction, disposal, installation of joints as shown in standard plans and construction details, furnishing and installing cast-in-place detectable warning surface, sidewalk between the ECR and BCR, landing, curb and gutter between the ECR and BCR, integral retaining curb, adjusting all affected pull boxes to finished grade where required (including the adjustment of conduit sweeps and conductors when conflicting), protection of existing trees, parkway restoration, sleeving of drainage outlets through curb, removal or replacement of 2-feet wide asphalt hot mix paving (C2 PG64-10) over 6-inch thick C.A.B. adjacent to the curb ramp and adjacent sidewalk within the curb return, and no additional compensation will be allowed therefore.
Payment for INSTALL ADA TRUNCATED DOMES FOR TRACK CROSSINGS shall be per the Contract Unit Price per Each and shall include full compensation for all labor, equipment, tools and materials to install new truncated domes and remove interfering portions of existing concrete sidewalk to install the work complete in place, including sawcutting, and no additional compensation will be allowed therefore.
SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS,
AND PAVEMENT MARKERS
314-1 GENERAL. Furnishing and installation of traffic markings shall include all work required to place raised pavement markers, thermoplastic material and curb paint. Legends and crosswalks shall consist of thermoplastic material with glass bead finish.
Striping work and materials shall conform to the provisions of the Standard Specifications of the State of California, Department of Transportation, latest edition, and the Traffic Manual of the State of California, Department of Transportation. Installation of traffic markings shall be completed within 5 working days of paving.
314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKING. 314-4.1 GENERAL. Each fire hydrant in the project area shall be marked by placing a doublesided raised pavement marker with reflective blue markings on each side. The marker and adhesive shall be equivalent to Caltrans pavement markers.
Place one marker 6 inches from street centerline toward hydrant on a line projected approximately perpendicular to curb. Place two markers if hydrant is on a corner, one on each street.
PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION
400-2 PERMANENT SURVEY MARKERS. Shall be under the scope of the Construction Management and Inspection Services. Contractor’s scope of services for survey work shall be limited to Section 3-10.3 Line and Grade of the General Provisions.
TP-12
SECTION 401 - REMOVAL
401-3. CONCRETE AND MASONRY IMPROVEMENTS.
401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway, and Alley Intersections.
Concrete sidewalk construction shall include removal and disposal of existing interfering structures, tree roots, objects, soil, etc. Contractor shall remove and replace any inadequate existing base material with compacted CMB.
Any damaged utility boxes, traffic signal pull boxes, etc., shall be replaced. All boxes shall be adjusted to grade and all costs for this work shall be incidental and included in this item of work.
Concrete curb and gutter construction shall include removal and disposal of existing interfering structures, objects, soil, etc.
Curb & gutter to be replaced shall be installed at the same location as the existing on a straight grade across the limits of the replacement.
Removal, disposal and construction of adjacent 2-feet wide asphalt hot mix paving (C2 PG64- 10) over 6-inch thick C.A.B. shall be included.
Curb Ramp construction shall include removal and disposal of interfering structures, objects and soil.
Included in this construction is the adjustment and protection of sweeps, conduits, pull boxes, utility access frames and covers to finished grade and protection of traffic detectors, stub-outs and homeruns. Traffic detectors damaged by the Contractor's operations shall be replaced at the Contractor's expense.
Removal, disposal and construction of adjacent 2-feet wide asphalt hot mix paving (C2 PG64- 10) over 6-inch thick C.A.B. shall be included.
At locations where street lighting or traffic signal poles encroach into the curb ramp to be installed, concrete pedestals shall be constructed between finished grade and pole bases.
Removal, disposal and construction of adjacent curb & gutter (within the limits of the curb return), spandrel and cross gutter shall be included.
Except at concrete spandrels, curb ramps shall be sawcut 6" from curb face and minimum asphalt replacement will be required if any.
Driveways, approach, alley intersection, spandrels and cross gutters construction shall include removal and disposal of interfering structures, objects and soil.
Removal, disposal and construction of adjacent 2-feet wide hot mix asphalt paving (C2 PG64- 10) over 6-inch thick C.A.B. shall be included.
Concrete to be removed shall be sawcut to a minimum depth of 5 inches at score marks or as marked by the City. Sawed edges, broken or chipped during construction shall be resawn at the contractor's expense. Increase in concrete quantity due to resawing shall not be considered for payment. Upon concrete removal, the City Parks Superintendent shall be informed to check TP-13
and approve all roots to be removed. If he determines the tree cannot be saved, removal and planting of a new tree shall be per unit cost.
All edges shall be parallel or perpendicular to curb faces except cuts around objects shall be on a curvilinear cut, a maximum of 4 inches departure from the straight cut within every 2 feet. The edges of Portland cement concrete remaining in place shall be sawcut and shall have clean, solid vertical faces.
The Contractor is responsible for inspecting each location prior to submitting a bid.
Remove and replace defective concrete work with new materials. Permission to patch any defective areas shall not be a waiver of the Engineer's right to require complete removal of defective work if patching does not restore quality and appearance of work.
The Contractor shall remove all debris and perform all cleanup work to the satisfaction of the Engineer within 3 working days after forms have been removed at any location.
The Contractor shall regrade the area at the back of curb/gutter where the new curb/gutter is constructed at a different grade than existing curb/gutter. The graded area shall have a maximum slope of 3:1 and 2% in city parkways. Fill material, if required, for this grading shall be furnished by the Contractor. All landscaping and irrigation in the graded area shall be repaired to match existing.
Concrete removed shall be replaced within five (5) days after removal. All restorations shall be completed a maximum of five (5) days after concrete placement (i.e. backfill, grading of dirt, asphalt repave etc.) One Hundred ($100) dollars per calendar day and location shall be charged to the Contractor for failure to comply with the above schedule as required by the Engineer.
SECTION 402 – UTILITES
402-2 PROTECTION. The Contractor shall provide coordination with all utility companies involved and shall provide protection from damage to their facilities. The Contractor shall be responsible for repair or replacement to said facilities made necessary by its failure to provide required protection.
The Contractor shall be solely responsible to check all utility record maps, books, and/or other data in the possession of the CITY, other agencies, and/or all utility companies, and no allowance shall be made for any failure to have done so.
The Contractor shall utilize the services of “Underground Service Alert-Southern California” for utility locating in all public right-of-ways by calling 811 or 1-800-227-2600 at least 48 hours prior to any excavation.
Underground lines that are potentially hazardous such as oil company lines, natural gas mains, and electrical conduits will be carefully located by the owner as provided in the Standard Specifications. The Contractor shall take special precautions in determining the precise location and depth of these structures and coordinate work with the utility to ensure that they will not be damaged by its operations.
402-7 PAYMENT. Payment for adjusting of utility valves and meters to grade will be at the contract unit price per Each for ADJUST WATER VALVE TO GRADE and shall include full compensation for all labor, equipment and materials to construct the work complete in place. No additional compensation shall be allowed therefore.
TP-14
SECTION 403 – MANHOLE ADJUSTMENT AND RECONSTRUCTION
403-1 GENERAL. Adjustment of utility access openings shall include all work required to set access frames and covers flush with pavement.
402-7 PAYMENT. Payment for manhole frames & covers to grade will be at the contract unit price per Each for ADJUST MANHOLE FRAME AND COVER TO GRADE and shall include full compensation for all labor, equipment and materials to construct the work complete in place. No additional compensation shall be allowed therefore.
SECTION 404 – COLD MILLING
404-1 GENERAL. Payment for cold milling pavement shall be according to the square feet of surface approved for milling irrespective of the actual area milled, the depth of milling, the number of passes required, or the pavement material milled. There will be no compensation for over milling.
The City has investigated the street section and determined that pavement section has variable depths of asphalt and Portland cement concrete pavement, however, any presence of pavement fabric, petromat or irregular material shall be included in the bid item price for "cold milling" and no extra payment shall be made.
Areas of distorted pavement shall also be cold milled to a smooth uniform surface.
COLD MILLED AREAS SHALL NOT REMAIN UNPAVED OVER MORE THAN 3 WORKING DAYS.
404-11 PAYMENT. Payment for COLD MILL ASPHALT PAVEMENT (2” UNIFORM DEPTH) shall be per the Contract Unit Price per Square Foot and shall include the cost for all sawcutting and/or cold milling, removal of asphalt concrete, compaction, haul away, and disposal to facilitate the construction of proposed improvements and no additional compensation will be allowed therefore.
PART 6 - TEMPORARY TRAFFIC CONTROL
SECTION 600 - ACCESS
600-1 GENERAL.
600-1.1 Public Convenience and Safety Access. The Contractor shall provide temporary “No Parking” and all other signs which are necessary for the safe and orderly conduct of vehicular traffic as directed by the Engineer and as specified herein. Contractor shall also provide an approval barricaded area in the parking lane for pedestrian traffic during such time as the parkway is unfit to be used for pedestrian traffic.
At such times as driveways are inaccessible due to the Contractor’s work, they shall be blocked by two (2) Class II barricades or one (1) Class II barricade and two (2) delineators. Driveways that are ramped or planked for temporary access shall be provided with a barricade or delineator at each side. The Contractor shall give 24-hour notice to affected property owners prior to blocking any driveway.
TP-15
The Contractor shall provide access for refuse collection on the regularly scheduled days. He shall also facilitate or assist in the collection where such work is hampered by his operations. 600-1.2 Street Closures, Detours, and Barricades. The Contractor shall not close any street within the City of Gardena without first obtaining the approval of the Engineer. Barricading, traffic control and detour diagrams in connection with street closures shall be submitted by the contractor as required by the Engineer.
The Contractor shall provide and install barricades, delineators, warning devices and construction signs in accordance with the California Manual of Temporary Traffic Controls or W.A.T.C.H. Handbook. During adverse weather or unusual traffic or working conditions additional traffic devices shall be placed as directed by the Engineer. All traffic signs and devices shall also conform to the California Manual of Temporary Traffic Controls or W.A.T.C.H.
Handbook.
The Contractor shall provide and maintain Type II barricades along excavation edges parallel to the flow of traffic at a maximum spacing of twenty-five feet. Type II barricades mounted with flashers shall be installed around work areas in parkways. Type II barricades shall have alternating reflective orange and reflective white stripes at an angle of 45 degrees. The strip width shall be in accordance with Table 5-1 “Barricade Characteristics” “Manual of Traffic Controls for Construction and Maintenance Work Zones”.
During paving operations, barricades may be supplemented with minimum size eighteen-inch high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty feet. Traffic cones and delineators used within State rightof-way shall be a minimum size of twenty-eight inches high. At all access points such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five-foot intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a “Road Closed” sign shall be provided at the nearest prior intersection. “No Left Turn” signs shall be provided wherever required by the Engineer.
When one-way access from a side street or alley is permitted, barricades and cones shall be provided at five-foot intervals for a distance of fifty feet on either side of the centerline of the intersecting street, or alley.
Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices, the Agency will place such necessary items and the Contractor shall be liable to the Agency for providing such devices in accordance with the following provisions:
1. For placing of barricades: $5.00 per barricade for the first day or any part thereof and $2.00 per barricade, per day, for each day thereafter or any part thereof. For flashers: $2.50 per flasher for the first day or any part thereof and $1.00 per flasher, per day, for each day thereafter or any part thereof. For traffic cones:
$1.00 per cone for each day or any part thereof.
2. In the event that the services of the Agency are required between the hours of 5:00 P.M. and 8:00 A.M., during the normal week or at any time on Saturday, Sunday or a Agency holiday, there shall be an additional charge to the above set forth minimums of $188.00 for each service trip required.
Contractor shall relocate, preserve and maintain the visibility of all existing signs within the project limits which affect the flow of traffic, as directed by the Engineer. Any signs which are damaged or found to be missing during the course of construction shall be replaced by the Contractor at his expense as directed by the Engineer. All other signs that interfere with the course of work and are not necessary for the safe flow of traffic will be removed and replaced by the Agency. Traffic control signs include Stop Signs, Speed Limit, Parking Restrictions and other regulatory signs.
SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND
MAINTENANCE WORK ZONES
601-1 GENERAL. A minimum of two (2) lanes (one lane in each direction) shall be maintained at all times for a continuous flow of traffic, except as otherwise approved by the Engineer.
The Contractor shall provide eight (8) Traffic Advisor Portable Changeable Message Signs , two weeks prior to the start of construction. The Traffic Advisor Portable Changeable Message Signs will be located in the following locations: 2 at Artesia, 2 at Western, 2 at Normandie, and 2 at Vermont. The message text will include “ARTESIA CONSTRUCTION WESTERN TO VERMONT” and start date. The Contractor shall maintain those eight (8) Traffic Advisor Portable Changeable Message Signs and shall be responsible for moving and programming the message signs as directed by City during the entire duration of construction.
Lane closures shall be allowed between 8:00a.m. and 4:00p.m. only. No traveled lane shall be closed overnight without prior City approval. Access to private property shall be maintained at all times.
"Temporary No Parking" signs shall be posted no more than 100 feet apart at least 72 hours prior to work. The signs shall be mounted on either 1” x 2” X 3’ high wood stakes, Type II barricades, or 39-inch high delineators. Signs shall not be posted on trees, traffic signal poles, utility poles, streetlights, or any other street furniture. Signs shall be professionally made of moisture-resistant, heavy duty cardboard or other approved material. "Temporary No Parking" signs shall be maintained by the contractor at all times and shall be approved by the Engineer prior to posting. Cover existing street signs as directed by the Engineer. "Temporary No Parking" signs shall be implemented for one week only (M-F) at a time. Signs shall be removed and reposted each week as needed and approved by the City.
DURING PAVING OPERATIONS, THE CONTRACTOR SHALL PROVIDE INDIVIDUALS AND EQUIPMENT DESIGNATED TO PERFORM AND MAINTAIN TRAFFIC CONTROL ONLY. The Contractor shall furnish, place and maintain all temporary traffic control devices required for the safe and orderly flow of vehicular and pedestrian traffic during construction. All Traffic control shall conform to the California Manual of Temporary Traffic Controls (California M.U.T.C.D.) or Work Area Traffic Control Handbook (W.A.T.C.H. Handbook).
If traffic control measures are not in conformance with these provisions, the project shall be stopped until conformance is attained to the satisfaction of the Engineer.
At locations where excavations are left open overnight, flashing barricades shall be placed along the excavation at a maximum spacing of 20 feet. A minimum of 3 flashing barricades shall be placed at any one excavation.
Temporary striping will be permitted only on base course and pavement to be overlaid.
Temporary pavement markings to be placed on new asphalt shall be spaced at 25 ft maximum and shall be removable without damage to the new overlay. Method of temporary markings shall be submitted to the Engineer for approval at the preconstruction meeting.
TP-16
TP-17
The Contractor shall submit and obtain written approval of traffic control plans from the Engineer five (5) working days prior to implementing.
Temporary lane closures shall be allowed during working hours specified in these Technical Provisions. Temporary lane closures maintained beyond the normal working hours may have a negative economic effect on the local residential, commercial/industrial business, and traveling public. Unless the Contractor secures prior written approval from the Engineer to maintain temporary lane closures beyond the working hours allowed, the Engineer may deduct a fee from a progress payment or bond for each temporary lane closure maintained beyond the allowed working hours. The fee will be accessed at a rate of Five Hundred ($500) per each travel lane per each thirty (30) minute interval, or fraction thereof as required by the Engineer. In no event will work be allowed past 5 p.m.
Construction Phasing - The order of work, except where otherwise specifically required by the plans and specifications, such as the phasing requirements, shall be determined by the Contractor who shall be solely responsible for coordinating all subcontract and prime contract work to minimize delays during construction.
The Contractor may consider alternate phasing plans if they accelerate completion of the project or provide less disruption during construction. All changes to traffic control and detour plans shall be submitted to the Engineer for approval a minimum of 5 working days prior to commencing work. Work hours for the various phases are described in each phase below.
The Contractor shall submit traffic control plans including temporary striping for Engineer’s approval no later than 15 days after issuance of NTP for Construction for project. The plans shall be prepared on 24” by 36” paper and shall be prepared bya California registered civil or traffic engineer.
The construction shall be per the following general phases and requirements. Contractor may construct phases simultaneously with the approval of the Engineer. The Contractor shall include these sequences in his work progress schedule to be submitted. edule to be submitted.
Phase 1: Concrete Improvements
A. Remove and construct concrete work (curb and gutter, median curb, curb ramps, sidewalk, and driveways).
B. Adjust affected pullboxes to new finish grade.
C. During working hours, a minimum of two (2) lanes in each direction shall be maintained open in the vicinity of the work. All lanes shall be open at the end of the work day.
D. Work hours shall be from 7:30 a.m. to 4:30 p.m, and is subject to change at City’s discretion at no additional cost.
E. For the cross gutter spandrel work location, the cross gutters shall be backfilled and plated with traffic bearing non-skid steel plates at the end of each working day.
F. Provide temporary striping, traffic control, and advisory signs.
G. The Contractor shall maintain ingress/egress access for all streets and driveways.
TP-18
H. The Contractor shall coordinate with the UPRR representative for concrete work within UPRR Right-of-Way.
Phase 2: Full Depth Asphalt Trench Replacement.
A. Where required in the plans, remove existing pavement.
B.
C.
Construct full depth asphalt concrete. Finish pavement surface shall be flush to existing adjacent pavement.
During working hours, a minimum of two (2) lanes in each direction shall be maintained open in the vicinity of the work. All lanes shall be open at the end of the work day.
D. Work hours shall be from 7:30 a.m. to 4:30 p.m, and is subject to change at City’s discretion at no additional cost.
E. During working hours, the roadway improvements shown on the plans may be closed to through traffic with access maintained for local residents and businesses. All roads project shall be fully open at all other times.
F. Provide temporary striping, traffic control, and advisory signs.
G. The Contractor shall maintain ingress/egress access for all streets and driveways work is required in front of the street or driveway.
Phase 3: Landscaping and Irrigation and Traffic Signal Modifications A. Construct landscaping and irrigation improvements per plans and specifications.
B. Construct traffic signal modifications per plans and specifications.
C. During working hours, a minimum of two (2) lanes in each direction shall be maintained open in the vicinity of the work. All lanes shall be open at the end of the work day.
D. Work hours shall be from 7:30 a.m. to 4:30 p.m, and is subject to change at City’s discretion at no additional cost.
E. Provide temporary striping, traffic control, and advisory signs.
F. The Contractor shall maintain ingress/egress access for all streets and driveways.
Phase 4: Manhole and Water Valve Adjustment, Final Paving and Striping A. Adjust manholes and water valves to grade.
B. Work hours shall be nighttime 8:00 p.m. to 5:00 a.m, and is subject to change at City’s discretion at no additional cost. All lanes closed due to paving should be opened by 6:00am.
C. Provide temporary striping, traffic control, and advisory signs.
D. The Contractor shall maintain ingress/egress access for all streets and driveways.
TP-19
E. Cold mill 2-inches of existing asphalt pavement and construct 2-inch final asphalt course paving.
F. Upon completion of final paving, the Contractor shall immediately install temporary pavement tabs to maintain centerline and lane line delineation that shall comply with the final striping plans. The Contractor shall begin the final traffic striping within 36 hours of completion of the overlay.
601-4.5 PAYMENT. Payment for TRAFFIC CONTROL shall be at the contract lump sum price for all the items specified above and includes, but not limited to, advisory signing, removal and relocation of existing signage, temporary lane markings, construction restriping and removal, warning signs, delineators, barricades, flagmen, safety equipment, maintenance of traffic control, resident and business notifications, all labor, materials, tools, incidentals, necessary, and preparation of traffic control plans. Progress payment for this item shall be based on the percentage of work under this item completed at the time of billing.
PART 7 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS
SECTION 700 – MATERIALS
700-1 GENERAL.
The City maintains a Traffic Signal Qualified Product List (QPL) included in Section 700-6 of the Special Provisions. The Engineer shall not be precluded from sampling and testing products on this list. The manufacturer of the product on the QPL shall furnish the Engineer a Certificate of Compliance in accordance with subsection 4-5 “Certificate of Compliance” of the Special Provisions for each type of material supplied.
Requests for substitutions shall be in accordance with subsection 4-6 “Trade Names or Equals” of the Standard Specifications and the Special Provisions.
Contractor shall coordinate with City’s inspector for disposition of existing materials and/or equipment to be salvaged, as indicated on the project plans. 700-5 TRAFFIC SIGNAL MATERIALS.
PREFACE: All work and materials shall conform to the "Standard Specification for Public Works Construction", 2015 edition, except as modified by the contract and these Technical Provisions. 10-24. SPLICING.
All conductor splicing shall conform to Section 86-2.09 of the Standard Specifications of the State of California, Department of Transportation, latest edition. All detector loop wire and leadin cable shall be soldered at every splice or connection. 700-5.8 Detectors.
700-5.8.2 Inductive Loop Detectors. Loop detector wire shall be Type 2 and loop detector lead-in cable shall be Type B per Section 86-1.02F of the State of California, Department of Transportation Standard Specifications, and latest edition.
TP-20
700-5.1 CONDUIT.
General
Conduit shall conform to the provisions in Section 86-2.05, “Conduit” of the Caltrans Standard Specifications and these Technical Provisions.
Requirements
It is required that all conduit will be installed by directional drill method and be high density polyethylene (HDPE) Schedule 80 UL continuous conduit. HDPE conduit shall be designed and engineered for direct burial, directionally drilled installation, or encased underground applications, and shall be installed at locations as shown on the plans.
The PVC Schedule 80 UL conduit shall be designed and engineered for direct burial or encased underground applications, and shall be installed at the pull box modification locations where conduit elbows are upgraded to sweeps, or as shown on the plans. The PVC conduit shall be straight and the ends shall be cut square to the inside diameter. The PVC conduit system shall be designed so that straight sections and fittings will assemble without the need for lubricants or cement.
All conduits shall be free from defects including non-circularity, foreign inclusions, etc. It shall be nominally uniform (as commercially practical) in color, density, and physical properties.
If new conduit is being installed into an existing pull box location, the Contractor shall protect existing pull box and conduit from damage. Should the existing pull box and/or conduit become damaged, the Contractor shall repair and/or replace damaged pull box and conduit at the cost of the Contractor and not the City. Prior to repair/replacement, the Contractor shall notify the City of exact location and contents of damaged pull box and conduit.
All pavement markings shall be returned to existing conditions. If disturbed, the Contractor shall replace or repair any and all pavement markings. All work shall be approved by the Engineer.
If any new conduits cross any existing oil pipes, specific requirements shall be enumerated to assure compliance within their easement. Contractor shall coordinate with the Utility Company that owns the oil pipes.
The Contractor shall obtain written approval from the Engineer before installing any conduit.
Quality Control
All conduits furnished, as part of the Contract shall be new, UL-listed, and meet NEMA and NEC requirements pertaining to electrical conduits and components.
HDPE Schedule 80 Continuous Conduit
The size of the HDPE conduit shall be as shown on the plans and shall meet the following requirements:
The HDPE Schedule 80 continuous conduit shall conform to NEMA TC-2 and UL651B.
The conduit leading to splice vaults or pull boxes shall be terminated with a manufactureproduced terminator connector to seal the wall of the spice vault/pull box.
TP-21
The conduit shall be color coded black.
The conduit shall also be marked with data traceable to plant location, date, shift, and machine of manufacture.
Conduit shall be Carlon or Endot made or approved equivalent.
PVC Schedule 80 Conduit
The size of the PVC Schedule 80 conduit shall be as shown on the plans and shall meet the following requirements:
The PVC Schedule 80 conduit shall conform to NEMA TC-2 and UL 651 specifications.
The conduit shall have an extended 6" integral "bell" end.
The conduit shall have a circumferential ring on the spigot end, which shall be used to insure proper insertion depth when connecting conduit ends.
The conduit shall also be marked with data traceable to plant location, date, shift, and machine of manufacture.
A complete line of fittings, adapters, and bends (sweeps) shall be provided by the conduit manufacturer and shall be manufactured from the same materials and manufacturing process as the conduit. The complete system will allow for all these fittings: Coupling Kits, Manhole Terminator Kits, Lubrication Fittings, and Repair Kits.
Conduit shall be Carlon or Endot made or approved equivalent.
Installation
Boring or drilling methods shall be used for the installation of new conduit, as trenching in pavement method is not allowed unless previously approved by City Engineer.
Rigid metal drill rod to be used as a drilling or jacking rod for new conduit shall be fitted with suitable drill bits for the size as approved by the Engineer. Conduit runs shall be installed continuous in same type material from the beginning to the terminating end of the run.
Conduits terminating in “Signal Interconnect” pull boxes shall utilize 45° bend elbows rather than 90° elbows.
Conduit runs are shown on the plans in schematic form only. The actual installation shall be completed in the most direct manner possible without interfering with existing underground facilities. The Contractor shall locate all interfering underground utilities as required by the State Standard Specifications to facilitate the installation of the conduits in the most direct manner, and minor changes will not constitute extra work.
All conduit ends shall have an approved bell bushing installed.
Non-metallic conduits without a grounding conductor shall have a bare #8 AWG solid copper wire that shall terminate at each pull box and at the ends of conduit runs. Eighteen (18) inches of the solid copper wire shall be coiled in each pull box. After conductors have been installed, the ends of conduits terminating in pull boxes; the controller cabinet or other terminating facilities shall be sealed with an approved type of sealing compound (duct seal only).
TP-22
700-5.2. PULL BOXES.
General
Pull boxes shall conform to the provisions in Section 86-2.06, “Pull Boxes” of the Caltrans Standard Specifications and these Technical Provisions.
Pull Box and Pull Box Cover
Pull boxes shall conform to the provisions in the latest version of the Caltrans Standard Specifications and Standard Plan ES-8 and these Special Provisions for TRAFFIC pull boxes.
All new TRAFFIC pull boxes shall be pull box number 6 (PB#6), or pull box number 6 with extension (PB#6E), or pull box number 6 traffic rated (PB#6(T)) as noted on the Plans. PB#6 shall have nominal dimensions of 36 inch L x 24 inch W x 12 inch D, as stated in these Special Provisions and per the Plans. PB#6E shall have nominal dimensions of 36 inch L x 24 inch W x 24 inch D, as stated in these Special Provisions and per the Plans. PB#6(T) shall have nominal dimensions of 36 inch L x 24 inch W x 12 inch D, and shall have a steel lid rated for regular traffic as stated in these Special Provisions and per the Plans.
Pull boxes shall be provided with locking mechanisms as specified in the Caltrans Standard Plans. Fastening type shall be hex head nut / bolt.
Where pull boxes are installed in sidewalk, sidewalk shall be removed and replaced from score line to score line as directed by Engineer.
Pull boxes and covers in the sidewalk or behind the curb shall be per below, Christy "Fiberlite" models, or Engineer approved equivalent, unless otherwise noted on the Plans.
Size Approved Models
#5 Box Christy N30 Electrical Box
#5 Lid Christy FL30T
#6 Box Christy N36 Electrical Box
#6 Lid Christy FL36T
#6 Box (Traffic Rated) Christy B1730
#6 Lid (Traffic Rated) Christy B1730-51JH
#6E Extension Christy B36X12
Covers for pull boxes, except for ceiling pull boxes, shall be marked as follows:
“TRAFFIC SIGNAL”: Where pull box contains traffic signal conductors with or without street lighting conductors. Traffic signal conductors include all field wiring, and loop detector conductors and video coaxial cables.
“TRAFFIC S.I.C.”: Traffic Signal Interconnect copper cable or Communications cable. “TRAFFIC F.O.”: Traffic Signal Interconnect Fiber Optic Communications cable. “STREET LIGHTING”: Where a pull box contains street lighting conductors only. “HIGH VOLTAGE” shall be added where street lighting voltage is above 600 volts. “TELEPHONE”: Where pull box contains telephone conductors only.
TP-23
“EDISON”: Where pull box contains Southern California Edison Company conductors.
Installation Requirements
Any area disturbed by Contractor at/near an existing pull box shall have pull box replaced new.
Grouting is required at the bottom of all pull boxes, unless otherwise specified by Engineer.
Within the pull box, the conduit shall be placed in a manner such that the lowest portion of the opening shall be a minimum of two (2) inches above the grouted bottom of the pull box, and the upper portion of the opening shall be a minimum of eight (8) inches from the top of the pull box.
The conduit shall also be placed in a manner that will allow any cables/wires to be pulled in a straight line and clear the side of the pull box by a minimum of two (2) inches (angle of exit.) All broken or damaged pull boxes and pull box lids shall be replaced and adjusted to grade. No new or existing pull box shall be located within one (1) foot of any curb ramp.
Contractor shall install new pull boxes in order to complete the new traffic signal system as specified on plan(s). The Contractor may, upon approval and at his expense, install additional pull boxes to facilitate his work. New pull boxes shall be placed with their tops flush with surrounding finish grade.
700-5.3. TRAFFIC SIGNALS.
General Requirements
The contract requires completion of all work in accordance with these technical specifications and, where applicable, the Caltrans Standard Specifications, October 2018; and the Caltrans Standard Plans, October 2018, or the most recent editions, thereof.
Furnishing and installing traffic signals, highway lighting, and sign illumination systems, shall conform to the provisions in Section 86, “Signals, lighting and Electrical Systems” of the State Standard Specifications, and State Standard Plans dated October 2018, and these Special Provisions. The State Standard Specifications shall hereinafter be referred to as the SSS and the State Standard Plans will hereinafter be referred to as the SSP.
In addition to the regulations and code specified in Section 86-1.03, “Regulations and Code,” of the SSS, all work and materials shall be in accordance with the Regulations of the Southern California Edison Company pertaining to service equipment and installations thereof.
Reference Specifications and Standard Plans
1. Standard Specifications Except as modified herein, materials and installation shall conform to the California Standard Specifications, October 2018. All references in this section to "Standard Specifications" shall be understood to be referenced to the California Standard Specifications.
2. Standard Plans Except as modified herein, all references in this section to "Standard Plans" shall be understood to be referenced to the California Standard Plans, October 2018.
3. Codes, Ordinances and Regulations All electrical materials and equipment furnished and installed under this section shall conform to the referenced regulations and codes TP-24
specified in Section 86-1.02 of the Standard Specifications, and to all other ordinances and regulations of the authorities having jurisdiction.
When reference is made to the Code, Safety Orders, General Orders, or Standards, reference shall be construed to mean the Code, Order or Standard in effect on the date set for receipt of bids.
Description
Furnishing and installing traffic signals and highway lighting systems and payment therefore shall conform to the provisions in Section 86, "Signals and Lighting", of the Standard Specifications (dated October 2018) and the Standard Plans of the State of California, Department of Transportation (dated October 2018) and these special provisions.
Removing, Reinstalling or Salvaging Electrical Equipment Hauling and stockpiling of salvaged material off the right-of-way, as directed by the City Engineer, shall be included in the lump sum price for signal construction.
All salvaged equipment shall be returned to the City of Gardena Public Works Department at the following address:
1717 W 162nd St
Gardena, CA 90247
(310) 217-9568
Installation
When new conductors are to be added or existing conductors are to be removed from existing conduit, all conductors shall be removed; the conduit shall be cleaned as provided in Section 86-2.05C, “Installation”; and both old and new conductors, as shown on the plans, shall be pulled into the conduit as a unit.
As-Built Prints
A set of blueline prints and a set of specifications will be kept at all times at the job site, on which all changes or variations in the work, including all existing utilities are to be recorded, in red, and/or corrected daily, and submitted to the Construction Manager (CM) when the work to be done is complete. These "As-Built" prints shall also indicate, in red, all deviations from the contract plans, such as: location of poles, pull boxes and runs, depths of conduit, number of conductors, and other appurtenant work.
700-5.4. FOUNDATIONS.
Foundations shall conform to the provisions in Section 86-2.03, "Foundations," of the SSS, and these Special Provisions.
The Contractor shall mark the location of all foundations, including poles, controllers, and service enclosures, and allow the City Engineer 48 hours to review and approve the locations. 700-5.5. STANDARDS, STEEL PEDESTALS AND POST.
Signal pole equipment shall conform to the provisions in Section 86-2.04, “Standards, Poles, Steel Pedestals, and Posts,” of the CALTRANS Standard Specifications and these Technical Provisions.
TP-25
Contractor is responsible for supplying and installing new signal pole material and equipment called out on project plan(s).
New standards shall be installed with three (3) feet minimum clearance between the pole face and curb face, unless otherwise shown on Plans or approved by Engineer. Standards shall be set at (2) inches above grade in all existing or future sidewalk grades and/or unpaved areas.
Contractor is required to pour a (4) inch thick concrete cap that is (1) foot wider than the standard base plate.
Pipe Tenons shall be provided as detailed on Standard Plan ES-7M, "Electrical Systems (Signal and Lighting Standards Details No. 1)". Mid-tenon shall not be constructed when noted on pole schedule.
In addition to identifying each new pole shaft as detailed on ES-7M of the State Standard Plans, the Contractor shall also identify each signal and luminaire mast-arm. The stamped metal identification tag shall be located on the signal or luminaire mast-arm near the butt end and shall contain the same information required by ES-7M. All pole tags shall include name of the manufacturer and shall be visible from the road surface.
New standards shall not be erected or installed until the new concrete foundations have set at least one week (7 days) and all new conduit, pull boxes, wiring, and other underground installation is complete and in place; and new signal faces, signs, and other materials required to complete the installation in its entirety have been inspected, and are in the Contractor's possession and available for immediate installation.
If applicable, all salvaged equipment not identified to be salvaged to the City shall become property of the Contractor, unless otherwise specified on plan.
If applicable, Contractor, at his/her own expense, shall arrange for the filling of any unused holes left in the pole shafts and signal or luminaire arms after drilling, with a full thickness galvanized metal disk welded to the pole or arm. Grind, sand, and paint with cold galvanized material.
The cost of removing, supplying, installing, and transportation of each standard, steel pedestal and post, and anchor bolts shall be included in the bid item price paid for the traffic signal work, and no additional compensation shall be allowed therefore. 700-5.6. CONDUCTORS AND WIRING.
Conductors and cables shall conform to the provisions of Section 86-2.08, "Conductors and Cables," and wiring shall conform to the provisions of Section 86-2.09, "Wiring," of the State Standard Specifications and these Technical Provisions.
Signal cable shall be installed continuously and without splices between terminal block and signal cabinet, unless otherwise approved by the Engineer or his field representative. As indicated in the California MUTCD, Table 4D-107 (CA), Available Conduit Area, as a practical limit, conductors and wiring on projects for new installations should be installed to meet the 26% conduit fill limitation. Projects for existing conduit should be installed to meet the 35% conduit fill limitation.
Nylon jacketed conductors shall not be used. Conductors No. 8 AWG and larger shall be stranded. Plastic conduits containing power circuit conductors shall have a bare No. 8 AWG solid grounding copper conductor that shall terminate at each pull box at the ends of the conduit run.
TP-26
Splices shall be Type C as shown on State Standard Plan ES-13A, insulated by Method B.
Conductors No. 10 AWG or larger shall be spliced by the use of “C” shaped compression connector, and soldered.
Signal cable shall be installed for phase wiring in lieu of individual conductors, unless otherwise shown on the plan(s).
700-5.7. SIGNAL INTERCONNECT CABLE.
As shown on the Plans, existing signal interconnect is to be re-used and re-pulled into new conduit.
Signal Interconnect Cable (SIC) shall be 6-pair No. 22 gauge, unless otherwise shown on plan(s). Interconnect cable shall conform to the REA PE 22 Specification. Conductors with THHN and THWN installation shall not be used. Cable shall have polyethylene insulation, mylar sheathing and aluminum shielding. Cable shall be multi-colored twisted-pair cable with twelve #22 AWG copper conductors and shall use standard telephone color code.
Interconnect cable shall be installed continuously between intersection controller cabinets, as noted on plan(s). Splicing of signal interconnect cable will not be allowed. A minimum of (10) feet of SIC slack shall be provided in each pull box and shall not be coiled in a circular pattern.
Termination of SIC in controller cabinet shall be on TB0-1 to 12. Contractor shall make interconnect connections as directed by Engineer.
Permanent waterproof cable identification tags indicating where the direction SIC is coming from shall be attached to each cable end.
Contractor shall test the communication back to City Hall. 700-5.8. FIBER OPTIC CABLE.
As shown on the Plans, existing fiber optic is to be re-used and re-pulled into new conduit.
Existing fiber patch panels shall be relocated to new signal cabinets. Contractor shall test communication back to City Hall.
700-5.9. BONDING AND GROUNDING.
Bonding and grounding shall conform to the provisions in Section 86-2.10, “Bonding and Grounding” of the SSS, and these Special Provisions.
Grounding jumper shall be attached by a 3/16," or larger, brass bolt in the single standard or controller pedestal and shall be run to conduit, ground rod, or bonding wire in adjacent pull box.
Grounding jumper shall be visible after cap has been poured on the foundation. 700-5.10. SERVICE.
Electrical service shall conform to the provisions in Section 86-2.11, “Service,” of the CALTRANS Standard Specifications and these Technical Provisions.
TP-27
Unless otherwise noted on plan(s), Contractor shall install new 120/240V modified Type III-BF service cabinet made of corrosion resistant 0.125” natural aluminum with exterior raw aluminum finish to match the controller cabinet. All exterior hinges shall be piano-type stainless steel.
The 120/240V service equipment wiring shall consist of a 120V non-metered circuit for safety luminaires, and a 120V metered circuit for the traffic signal. A 40-amp metered signal breaker, non-metered 30-amp lighting breaker, and a metered 15-amp IISNS breaker and (2) 15-amp photocell control breakers shall be provided from the service panel. Provide (2) 3-pole 65-amp contactors and (2) test switches for lighting and IISNS.
Photoelectric controls shall conform to the provisions in Section 86-6.11, “Photoelectric Controls”, of the Caltrans Specifications and these Technical Provisions. Two delayed response Type V photoelectric controls and test switches shall be provided for lighting and IISNS. Two (2) photoelectric window shields shall be installed on service cabinet. A shield shall be provided over the sensor openings to prevent direct light sources, such as vehicle headlights, from affecting the switching mechanism.
Service shall be TESCO CLASS 28-105, or approved equal. Service cabinet shall meet Eurserc 308 and the requirements of the serving utility. The service cabinet shall bear a UL508 industrial control panel for service entrance equipment. The cabinet shall be completely prewired in the factory. Wiring shall conform to NEMA IIB standards showing external connections and external equipment.
Service equipment enclosures shall conform to the following, unless otherwise shown on plan(s):
1. 120/240 volt, Type III-BF (modified) meter service, as indicated on the plan.
2. Circuit breakers shall be industrial grade, Westinghouse Quicklag C, or approved equal.
Circuit breakers required:
1 - 100 Amp 3-pole (240V signal main, lighting main)
1 - 30 Amp 1-pole (120V spare - metered)
1 - 30 Amp 1-pole (120V safety lighting - unmetered)
1 - 50 Amp 1-pole (120V signal circuit - metered)
1 - 15 Amp 1-pole (120V safety lighting photoelectric control circuit-unmetered) 1 - 20 Amp 1-pole (120V IISNS circuit - metered)
1 - 20 Amp 1-pole (120V IISNS photoelectric control circuit) Circuit breakers and test switches shall be marked with identifying labels for each circuit breaker.
Type V photoelectric control contactor and test switch assembly shall be installed in the service cabinets. Photoelectric control contactors shall be as follows:
Luminaires - (1) 3-pole 65-amp
IISNS - (1) 3-pole 65-amp
Photoelectric control assembly for the IISNS and lighting shall be installed within the circuit breaker compartment of the service cabinet enclosure, and accessible to the City after installation of electrical meter.
If service equipment cabinet designs deviates in any way from these technical provisions or the details shown on the plans, details of such deviation shall be submitted to the Engineer for review and approval before fabrication of the contract cabinet(s).
TP-28
If deemed necessary by the Engineer, one complete prototype cabinet shall be delivered to the Engineer for review at least (15) days before fabrication of the contract fixtures. The prototype cabinet will be returned to the Contractor, and if permitted by the Engineer, the cabinet may be installed in the work.
The Contractor shall arrange with the Southern California Edison Company for final electrical service connections in conformance with the requirements of said utility and these Technical Provisions and shall pay all required contractor-related costs and fees required by the utility.
The Contractor shall notify the Engineer in writing at least (15) calendar days in advance of the date on which he desires any service connections or disconnects to be made. The Contractor shall be entitled to no extension of time or other compensation for any delay to this operation resulting from his failure to give the prescribed notification.
It shall be the Contractor’s responsibility to verify the location of, and to make arrangements for providing the necessary electrical connections for the traffic signal and lighting systems. The City will be responsible for the costs from the electrical utility provider.
City will pay all connection fees and sign authorization for power connection.
The bid item price for traffic signal work shall include the costs to provide electrical service(s), all necessary hook-ups, breakers, conduit and conductors, labor, materials, tools, and equipment necessary to install the service in place as shown on plans, and no further compensation shall be allowed therefore.
700-5.11. SERVICE CABINET FABRICATION
Maximum width 16” maximum, height 48” maximum, depth 17” maximum. Cabinet shall be fabricated from raw aluminum, with no protruding cabinet hood extensions.
The exterior of the cabinet shall be raw aluminum finish.
There shall be no exposed nuts, bolts, screws, rivets or other fasteners on the exterior.
Cabinets shall be equipped with a Corbin No. 2 locking system.
Cabinet shall have 2,000-pound stress-rated steel hasp, welded to the cabinet and door.
Distribution and control panel shall have separate hinged deadfront panels with ¼ latch and knurled knobs.
Breaker compartment shall have a safe barrier from the control compartment.
Removable back pan shall be mounted on (4) welded ¼” studs.
All circuit breakers shall be installed in a vertical position, handle up for “On” and handle down for “Off”.
Circuit breaker shall be industrial grade, Westinghouse Quicklag C, or approved equal.
All main bussing shall be UL approved copper THN cable bussing fully-rated for 125 amps.
TP-29
700-5.12. TESTING
Testing shall conform to the provisions in Sections 86-2.14B and 86-2.14C, "Field Testing," and "Functional Testing", respectively, of the Caltrans Standard Specifications and these Technical Provisions.
The Contractor will be responsible for all the costs involved in testing the controller cabinet assemblies, including transportation to and from the testing facility. Contractor is responsible for ordering and purchasing the controller cabinet assembly as specified in the following Section 86- 3, “CONTROLLER ASSEMBLIES”.
The Contractor shall submit the wiring schematic of the controller cabinet assembly for approval once design is completed (before assembly) to the City Engineer, City of Gardena, 1717 W. 162nd Street, Gardena, CA 90247.
The Los Angeles County Department of Public Works, Traffic and Lighting Division shall conduct testing of the controller and cabinet. The Contractor shall be responsible for supplying and delivering the new equipment to Los Angeles Department of Public Works testing Laboratory. Contact person James Martinez (626) 458-1708 Ext 1674. Contractor shall pay for the cabinet and controller testing and will arrange to authorize the testing of the cabinet by the L.A.C.D.P.W.
When completed, Contractor shall install new equipment at job site according to the Plans and Specifications.
Contractor shall be responsible for all damages sustained as a result of the delivery and installation of the controller cabinet from the lab to the job site. Any corrective action prior to final acceptance in the field shall be performed at the Contractor's expense.
Unless otherwise set forth in the Special Provision, any delays in work sustained as a result of delay in initial cabinet manufacturing and delivery may be subject to time extension at the written request from the Contractor.
In addition to the five days of continuous satisfactory operation, called for in Section 86-2.14C, "Functional Testing," of the CALTRANS Standard Specifications, five more days of satisfactory operation will be required when the signal system is connected to the Master System Controller.
The conflict monitor unit (CMU) shall be modified/tested in the field before "turn-on".
The Contractor shall arrange to have a field representative from the City, a City signal technician, a knowledgeable technician for the manufacturer of the traffic signal controller/cabinet assembly, and a representative from the video detection system and emergency vehicle detection system manufacturers, present at the time of the traffic signal turn-on. The representatives shall be fully-qualified to work on their respective traffic signal equipment. The manufacturer’s representative and City staff shall be notified at least seven (7) working days prior to intersection turn-on.
The turn-on of the traffic signal system shall not be made on a Friday or the day preceding a legal holiday; if it is on a Monday, notification to the City Engineer shall be made no later than the Thursday prior to the turn-on. Turn-on shall begin before noon of the approved day.
Loops shall be meggered at time of installation and before application of hot melt sealant in the presence of a City technician. The insulation resistance shall not be less than 100 megohms on all interconnect and loop circuits and 50 megohms for power circuits when the TP-30
megger tests are performed. Testing shall not be conducted until all control and/or sensor units and probes have been disconnected from the circuit.
700-5.13. CONTROLLER ASSEMBLIES
Solid-state traffic actuated controller units, cabinets and auxiliary equipment shall conform to the provisions in Section 86-3 “Controller Assemblies” of the CALTRANS Specifications, these Technical Provisions and NEMA TS-2 standards.
The following paragraphs shall be added to Section 86-3.04:
All new controller cabinets, controller assemblies, and ancillary equipment shall be furnished and installed by the Contractor unless noted otherwise on the plans.
Model 2070 ATC controller assemblies shall conform to the requirements in "Transportation Electrical Equipment Specifications," (TEES) and "Traffic Signal Control Equipment Specifications" (TSCES), issued by the Department, and to all addenda thereto current at the time of project advertising. A wired Type 332 cabinet and all auxiliary equipment required to control the system as shown on the plans, and as specified in the Standard Specifications and in these Technical Provisions shall be provided. The controller cabinet housing shall be aluminum with a raw aluminum finish. Cabinet assembly shall be system ready and furnished with a Model 400 modem, a modem interconnect harness, and a GPS time-source. The traffic signal controller cabinet will be furnished with Corbin No. 2 locksets.
The following paragraphs shall be added to Section 86-3.03:
The new traffic signal controller shall be a Model 2070 ATC with the McCain Omni Program.
The traffic signal controller assembly shall be furnished with a C21 Interconnect module and a 2070-1E Ethernet card.
700-5.14. EMERGENCY VEHCILE PRE-EMPTION
Replace with the following:
A complete, functioning Opticom (tm) emergency vehicle preemption (EVP) system, by Global Traffic Technologies (GTT), or approved equal, shall be furnished and installed by the Contractor, as indicated on Plan(s). The transmitting equipment is not included in this Contract. Existing optical detectors shall be re-used and re-located as indicated on Plan(s).
EVP equipment to be furnished and installed by the Contractor includes, but is not limited to, the following:
(Qty-1) GTT Model 764 rack-mounted phase selector.
(Qty-2) GTT Model 711 and (Qty-1) 722 optical detectors, or approved equal, for each approach as shown on Plan and as directed by the City Engineer. GTT Model 138 detector cable.
The system shall be designed to prevent simultaneous preemption by two or more emergency vehicles on separate approaches to the intersection.
The optical detector shall be mounted on the indicated signal mast arm by an approved mast-arm clamp. The detector shall not be mounted on the signal head.
TP-31
Emergency vehicle preemption sequence of operation shall be approved by the City Engineer prior to timing and turn-on of signals.
It shall be the responsibility of the Contractor to have a knowledgeable representative from the manufacturer of the emergency vehicle preemption equipment present for the first day of the traffic signal lighting function test, to insure proper installation and functioning of the EVP equipment.
The optical detector shall be a lightweight, weatherproof, adjustable, uni- or bi-directional optical detector assembly as indicated on plan. Internal circuitry shall transform optical energy from the optical emitter assembly into electrical signals for delivery via optical detector cable to the phase selection equipment.
The optical detector cable shall be a durable, shielded, 3-conductor cable with a drain wire and the necessary electrical characteristics to carry power to the optical detector from the phase selector and to carry the optical detector signal to the phase selector. It shall conform to the requirements of the manufacturer of the phase selector and optical detector.
The EVP phase selector shall be installed in the traffic signal controller cabinet. The phase selector shall interface with the signal controller and provide the following functions while not compromising the control equipment fail-safe provisions:
Sufficient power to all optical detectors required for the intersection.
Sensitivity to the optical detector signal via adjustable range potentiometers.
Differentiation of signals by optical detectors from one or more emitters on a first-come, first-serve basis.
Outputs to the controller in order to cause selection of the desired phase green display for the approaching emergency vehicle.
Smooth transition to non-priority signal operation upon passage of the vehicle through the intersection.
The Contractor shall provide a vehicle equipped with an emitter to test and verify satisfactory operation of the EVP system.
700-5.15. LED LUMINAIRES
Luminaires shall conform to the provision in Section 86-6, “Lighting” of the SSS, the approved Caltrans LED Lighting Purchase Specification and these Special Provisions. Each luminaire shall consist of an assembly that utilizes LEDs as the light source. In addition, a complete luminaire shall consist of a housing, LED array, and electronic driver (power supply).
LED Lamps shall be CREE STR-LWY-3M-HT-02-06 (250W equivalent) or approved equal.
Each luminaire shall be rated for a minimum operational life of 63,000 hours. Each luminaire will operate at an average operating time of 11.5 hours per night. Each luminaire is expected to have a minimum operational life of 180 months (15years).
The luminaires to be installed shall be 120 volt with integral constant wattage ballast and detachable power unit assemblies. The power unit assemblies shall contain the ballast, starter board, capacitors, and a heavy duty terminal block.
TP-32
The luminaire on-board circuitry shall include surge protection devices (SPD) to withstand high repetition noise transients as a result of utility line switching, nearby lightning strikes, and other interference.
The luminaire shall be operationally compatible with currently used lighting control systems and photoelectric controls as detail in Standard Specification 86-6.07.
The luminaire shall provide true ninety-degree (90 degree) cutoff with no light emitted above the horizontal. The lower edge of the luminaire housing shall extend below the light source and all glassware. Glare shields external to the luminaire will not be accepted.
The luminaire optical assembly shall be sealed, watertight, and filtered to prevent contamination from infiltration of gaseous and particulate matter. The lamp socket shall be factory preset to produce a medium cutoff IES Type III light distribution.
When the components are mounted on a down opening door, the door shall be hinged and secured to the luminaire housing separately from the refractor or lens frame. The door shall be secured to the housing in a manner to prevent its accidental opening. A safety cable shall mechanically connect the door to the housing.
The manufacturer shall provide a warranty against loss of performance and defects in materials and workmanship for the luminaires for a period of 84 months after acceptance of the luminaires. Replacement luminaires shall be provided promptly after receipt of luminaires that have failed at no cost to the City. All warranty documentation shall be given to the City. 700-5.16. VEHICLE SIGNAL FACES AND SIGNAL HEADS
Vehicle signal faces, signal heads, and auxiliary equipment, as shown on the plans and the installation thereof, shall conform to the provisions in Section 86-4.01 to 86-4.05 of the CALTRANS Standard Specifications and these Technical Provisions.
All signal heads shall be new, supplied by the same manufacturer, and shall be made of metal with 12-inch diameter Dialight, or approved equal, LED modules, with one-piece metal backplates.
Elbow fittings shall be bronze.
All new signal indications shall utilize light emitting diode (LED) signal modules. All LED signal modules shall conform to Section 86-4.01D, “Light Emitting Diode Signal Module,” of the Caltrans Standard Specifications and these Technical Provisions.
All optical vehicle signal indication units shall be of the light emitting diode (LED) type. The new LED module units provided shall be manufactured by Dialight Corporation, or approved equal, as listed on the Caltrans Pre-Qualified Product List as of the date of the project bid opening. The list is available on the Caltrans Internet Website at:
http://www.dot.ca.gov/hq/esc/approved_products_list/pdf/led_traffic_signals.pdf.
All LEDs provided for the project shall include an 8 ½” x 11” list of specific manufactured dates and serial numbers for each LED module.
A written fully-detailed sales order acknowledgement from the vehicle and pedestrian head assembly supplier shall be submitted to the City indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.
TP-33
Submitted sales order acknowledgements shall be approved by the City or its representative and shall be the only material or equipment used on this contract. All traffic signal heads, mountings, and hardware shall be new, fully-assembled by the designated supplier, and include the installation of LED modules. Contractor shall not fabricate or assemble traffic signal heads or mountings, and shall only install them on the poles supplied per plan.
Where a signal face is to be supported by a Type MAS side attachment slip-fitter inserted between 2 signal sections, a spacer or spacers shall be placed between the 2 sections. The vertical dimension of spacers shall permit proper seating of the serrations between the slip-fitter and the 2 sections. Holes in spacers shall align with front holes in the section housings.
In addition to the fastening through the large openings in the housing, the 2 sections shall be joined with at least 2 bolts through the holes near the front of the housings and spacers, and through matching holes in a reinforcing plate installed within each housing.
Spacers shall be made of same material as signal housing. Reinforcing plates shall be aluminum with a minimum thickness of 0.125-inch and shall be painted to match housing. Bolts for joining signal sections shall be stainless steel or cadmium-plated steel with round or binder heads.
In addition to Section 86-4.04, "Signal Mounting Assemblies," of the Caltrans Standard Specifications, the following provisions shall apply whenever a terminal compartment is required:
The terminal block shall be mounted vertically and to the side of the cable inlet guide. Sufficient lateral spacing shall be provided to allow pulling and connecting of incoming conductors without removal of the terminal block mounting screws. A minimum of one (1)-inch clearance shall be provided between the terminal block and all inside walls of the terminal compartment.
With the door open, there shall be a minimum of ten-by-four-inch (10" x 4") access to the terminal compartment for connection and inspection of the terminal block. The door shall be equipped with a neoprene gasket, permanently secured, to prevent water from entering the terminal compartment and captive screws for securing door. The mounting bolt spacing and cable guide location shall be as dimensioned on drawing ES-4D of the Caltrans Standard Plans. 700-5.17. PEDESTRIAN SIGNALS
Pedestrian signals shall conform to the provisions in Section 86-4.05, “Pedestrian Signal Faces,” of the State Standard Specifications and these Technical Provisions.
Pedestrian signals shall be Type C with egg crate type screens and shall be of the International symbol type. The pedestrian head housing and door shall be green and made of metal with no plastic parts, and shall be 16 inches by 18 inches. Pedestrian signals shall be of the Dialight Corporation uniform appearance countdown type, Part #430-6479-001X (ITE compliant), or approved equal.
Pedestrian signal ground wires shall not have splices between the poles and the controller cabinet. All pedestrian signal ground wires shall be joined and grounded within the controller cabinet.
700-5.18. PEDESTRIAN PUSH BUTTONS
Pedestrian push button assemblies and detector loops shall conform to the provisions of Section 86-5, “Detectors,” of the State Standard Specifications and these Technical Provisions.
TP-34
New pedestrian push buttons shall be ADA compliant (50mm diameter), Type B, Polara Bulldog No. BDL3-B (momentary, non-latching), or approved equal, with a stainless steel button, black body on a green frame. Pedestrian push button signs shall conform to the details shown on the plans. Fasteners used shall be stainless steel tamper proof screws for pedestrian push-button assemblies. Pedestrian calls to the controller shall be independent, by phase, and not as concurrent thru-phase pairs. Pedestrian signal ground wires shall not have splices between the poles and the controller cabinet unless approved by the Engineer or his representative in the field. All pedestrian signal ground wires shall be joined and grounded within the controller cabinet.
Touchless Accessible Pedestrian Push Buttons
Pedestrian push button assemblies and detector loops shall conform to the provisions of Section 86-5, “Detectors,” of the State Standard Specifications and these Technical Provisions.
New pedestrian push buttons shall be ADA compliant (50mm diameter), Type B, Polara Bulldog No. BDL3-B (momentary, non-latching), or approved equal, with a stainless steel button, black body on a green frame. Pedestrian push button signs shall conform to the details shown on the plans. Fasteners used shall be stainless steel tamper proof screws for pedestrian push-button assemblies. Pedestrian calls to the controller shall be independent, by phase, and not as concurrent thru-phase pairs. Pedestrian signal ground wires shall not have splices between the poles and the controller cabinet unless approved by the Engineer or his representative in the field. All pedestrian signal ground wires shall be joined and grounded within the controller cabinet.
APS must be on the Authorized Material List for Accessible Pedestrian Signals or Touchless Accessible Pedestrian Signals.
An APS must comply with the California MUTCD, chapter 4E, and must:
1. Have an audible speech message that plays when the push button is actuated.
The accessible pedestrian signal must have at least 5 audible message options.
2. Have a push button locator tone that clicks or beeps.
3. Allow the pushbutton to activate the pedestrian phase during any failure of the APS features.
4. Have a controllable and programmable volume level and messaging.
5. Be weatherproof and shockproof.
6. Weigh 7 lb maximum.
7. Measure 16 by 6 by 5 inches, maximum.
8. Have a switch for a push button.
9. Have a vibrotactile device on the push button or on the arrow.
10. Have an internal weatherproof speaker.
11. Have a microphone that senses the ambient sound level.
12. Include touch-free technology.
Theft-proof bolts used for mounting the enclosure to the standard must be stainless steel with a content of 17 percent chromium and 8 percent nickel. The enclosure must be shaped to fit the pole's curvature.
The color of a metallic housing must match color no. 33538 of AMS-STD-595.
TP-35
The color of a plastic housing must match color no. 17038, 27038, or 37038 of AMSSTD-595.
The separation between adjacent holes used for conductors and mounting must be at least twice the diameter of the larger hole.
The speaker grills must be located on the surface of the enclosure. The speakers must not interfere with the enclosure or its mounting hardware.
The signal interface cable between the APS and the pedestrian signal head must be rated for outdoor use and have a:
1. Four no. 18 stranded tinned copper conductors with a minimum insulation thickness of 15 mils
2. Cable jacket with a minimum thickness of 20 mils and rated for a minimum:
2.1. 300 V(ac)
2.2. 176 degrees F
3. Nominal outside diameter less than 350 mils
4. Conductor color code of black, white, red, and green Touch-free technology must:
1. Activate a pedestrian phase when a pedestrian hand motion is detected during a set time interval
2. Have user adjustable detection area and time interval parameters
3. Detect the pedestrian hand motion up to a 6-inch range from the face of the sensor within a minimum ± 45-degree cone zone from the center of the sensor. 700-5.19. ROADSIDE SIGNS
A. Remove Roadside Signs
Existing roadside signs to be removed at locations shown on the plans shall be removed and disposed of outside the public right-of-way.
Existing roadside signs shall not be removed until replacement signs have been installed or until the existing signs are no longer required for the direction of public traffic, unless otherwise directed by the City Engineer.
B. Relocate Roadside Signs
Existing roadside sign shall be removed and installed at new locations shown on the plans. Each roadside sign shall be installed at the new location on the same day said sign is removed from its original location.
Existing street name signs shall be relocated to the new traffic signal pole and mounted just above the mast arm bracket attachment.
C. Install Roadside Signs
Roadside signs shall be installed at the locations shown on the plans or where directed by the Construction Manager, and shall conform to details shown on the plans and the provisions in Section 56-2, "Roadside Signs", of the Standard Specifications. 700-5.20. VEHICLE LOOP DETECTORS
All vehicle inductive loop detector locations shall be approved by Engineer, or his representative, in the field prior to installation. Loops shall be centered in the lane, unless TP-36
otherwise indicated on the plan(s). Type E inductive loop detectors shall be per City Standard Plan ST-24 or Caltrans Standard Plan ES-5A & ES-5B as shown on the plans and shall be six feet in diameter and spaced 10’ apart, unless otherwise indicated. The front loops shall be installed at the limit line, unless otherwise indicated. New detector loops shall be wired in series and shall be installed on the same day in which the loop slots are cut. This shall include placement of the loop conductors and slot sealant. The sides of the slot shall be vertical and the minimum radius of the slot entering and leaving the circular part of the loop shall be (2) inches. Slot width shall be a maximum of 5/8-inch. Loop detector lead-in cables (DLC) shall be 2-pair Type B. Loop detector wires shall be Type 2. Each loop shall be capable of accepting two (2) or more sensor units.
All loop detectors as dimensioned on the plans shall have four (4) turns minimum, unless otherwise indicated in the Standard Plans. All homerun loop wires shall be in the crosswalk area unless otherwise indicated. Slot sealant shall be Hot-Melt Rubberized Asphalt Sealant and conform to the provisions of Section 86-5.01A(4) “Installation Details,” of the Caltrans Standard Specifications and as directed by the Engineer or his representative in the field.
Loops shall be meggered before termination within the presence of a City technician.
The detectors shall be tested with a motor-driven cycle, as defined in the California Vehicle Code, which is licensed for street use by the California Department of Motor Vehicles. The unladen weight of the motor vehicle shall not exceed (220) pounds, and the engine displacement shall not exceed (100) cubic centimeters. Special features, components or vehicles designed to activate the detector will not be permitted.
The motor-driven cycle shall be driven through the response or detection area of the detector at not less than (3) miles per hour, nor more than seven (7) miles per hour. The detector shall provide an indication in response to this test. In testing a vacant loop, any drift that exceeds an average of more than (1) Hz/minute shall be cause for rejection. 700-5.20.1. CALTRANS OWNED VEHICLE LOOP DETECTORS
Prior to commencement of work, if loop detectors are to be damaged, a 7-day notice shall be provided to the State Electrical Inspector to arrange modifications to traffic signal operations.
Work shall not commence without State Electrical Inspector approval.
Permittee shall provide, any temporary wiring, signal equipment, or service connections required at their own expense, to keep the existing traffic signal system in effective operation duration modifications.
All traffic loop detector installations shall have a minimum depth of 3.5-inches for existing pavement and 5-inches for new pavement. Type II wire with hot-melt rubber sealant shall be used. Type E, 6-Inch diameter loops shall be used.
Accidental damages, repairs shall be made within 10-days from the date of incident. If it deemed a threat to public health and safety, repairs shall commence immediately. All repairs are the responsibility of the permittee at no cost to the State.
Interconnect cables cannot be spliced; new continuous cable of the same type shall be installed between controllers, when damaged.
There shall be no official turn-on of any traffic signal until all appurtenances/equipment are properly installed, tested, and approved by the State Electrical Inspector. All associated pavement delineations/markings shall be placed, temporary traffic controls removed, mechanical fittings completed, and all holes filled prior to a signal turn-on.
TP-37
700-5.21. VIDEO DETECTION SYSTEMS
The Contractor shall furnish and install Video Detection System at each location as indicated on Plan(s).
The Video Detection System (VDS) shall comply with all rules and regulations of the Federal Communications Commission (FCC) and these Technical Specifications. The proposed location for the VDS equipment installation is included in the Contract Drawings.
The VDS shall include the Video Detection Cameras, VDS Cable (video/data/power), VDS camera mounting hardware, and the Video Detection Processor and LCD monitor to be installed in the cabinet. The VDS shall be Vantage APEX or approved equal.
The Contractor shall coordinate with the VDS manufacturer for installation of the cameras and processor and the final setup of the detection zones for proper operation. 700-5.22. INTERNALLY ILLUMINATED STREET NAME SIGNS
Replace with the following:
All signs and hardware shall be new; the materials and workmanship shall be of the best quality for the purpose.
The Contractor shall furnish and install LED Edge Lit internally illuminated street name signs manufactured by NuArt Lighting Products, or approved equal.
Model(s): NAIM-72-LED-D or NAIM-96-LED-D with mounting hardware.
Message: The visible message shall be displayed from both sides of the signs and be reflectorized. Signs shall have white legends, symbols, arrows, and 1/4” border with 1” radius corners on green background. The legend shall be as shown on the Plan.
The style and spacing of letters, figures, and arrows shall be Standard Alphabet Series B with 8” uppercase and 6” lowercase centered with “City of Gardena” flush left and Block Number flush right using 3” capital letters and numbers. Reference to “St”, “Ave”, or “Bl” shall not be shown on the sign panel.
The full size sign layout shall be submitted to the Engineer for approval prior to fabrication. It shall be the responsibility of the Contractor to keep the Engineer informed of all operations requiring inspection or approval prior to proceeding with fabrication.
Photocell and receptacle shall be omitted.
All IISNS signs shall be 18” H x 72” W or 18” H x 96” W (unless otherwise approved by the Engineer) double-sided and shall be mounted with hinged, adjustable or telescoping type brackets approved by the engineer.
Sign assembly must be guaranteed for a minimum of three years. 700-5.23. BATTERY BACKUP SYSTEM
The Contractor shall furnish and install a 72Volt Traffic UPS System with true on-line, solid state, microprocessor controlled power conditioner and Battery Backup System (BBS) or TP-38
Uninterruptible Power System (UPS). The system must continuously regenerate and condition the AC sine wave, where 100% of the power to the load, whether on utility or batteries, is generated by the on-board inverter. The system must be capable of operating, up to its rated power level, in extreme environments with existing equipment on the street today including any and all signal heads (i.e., Incandescent, LED, etc.). The Battery Backup System (BBS) is for use with a Type 332 system as detailed on plans. The contractor shall furnish new and install all necessary cables, wiring harness, and all other equipment and incidentals, including batteries, to connect the UPS to the traffic signal controller cabinet wiring harness to provide the intended operation.
The Traffic UPS shall consist of three major components, the Electronics Module, the Utility Bypass Switch, the Battery System with Fast Battery Charger.
The Electronics Module shall consist of the following:
A. True sine wave, micro Processor controlled high frequency inverter utilizing IGBT technology.
B. 3-stage, temperature compensated, battery charger.
C. Local and remote control of UPS functions.
D. Local and remote communications capabilities.
E. Support capability to accept an NTCIP-ready adapter or to connect a Spread Spectrum Radio modem.
F. Utility By-pass Switch for by-passing the UPS for repair or removal. The By pass switch must have a GFI and generator plug.
G. The Battery system shall consist of a string of 6 41 amp hour Outpost Batteries - OP72C-41 connected in series and a Fast Battery Charger The BBS shall be installed per the manufacturer’s guidelines.
The Contractor shall at his own expense, arrange to have a technician, qualified to work on the BBS assembly and employed by the BBS assembly manufacturer, or his representative, present at the time the equipment is turned on. The Engineer shall be notified at least two working days prior to the beginning of the functional test period.
Battery Backup Cabinet
The BBS system is to be installed in a separate side-mounted type 2 outdoor NEMA3R cabinet.
The BBS Cabinet must be at least 44”H x 26”W x 12” Deep with 3 shelves made by Clary or McCain.
The battery cabinet shall be mounted to the side of the signal cabinet at a minimum height of 30" above the foundation.
The BBS system shall be model SP1250LX-R as manufactured by Clary Corporation or City approved equal.
700-5.24. RUGGED FIELD LAPTOP COMPUTER
The Contractor shall furnish a field laptop for City traffic signal staff for controller operations. The laptop should be the following:
Dell Latitude 7424 Rugged Extreme Laptop. The laptop should have the general considerations:
Processor: 8th Gen Intel Core
Operating System: Window 10 Pro
Base/Graphics: Intel Core i5-835OU processor
Memory: 8GB. 2x4GB, 2400MHz
TP-39
Hard Drive: N.2 128GB PCIe Solid State
Display: 14” FHD WVA (1920 x 1080)
Warranty: 3 years
Software: Microsoft Office 365
SECTION 701 – CONSTRUCTION
701-1 GENERAL. MODIFY to ADD the following:
The work shall conform to the following codes and standards:
a) California Administrative Code, Title 8, Chapter 4 subchapter 5 b) NEC
c) The State Standard Specifications and State Standard Plans, current editions d) The CA MUTCD
701-4 DAMAGE TO EXISTING SYSTEMS.
ADD:
701-4.1.1 Traffic Detectors. Existing detection shall be maintained at all times during construction. In the event of unexpected damage by the Contractor or any of their subcontractors as determined by the City Representative, the Contractor shall commence repairs immediately.
The Contractor shall replace and restore to operation any damaged detector (inductive loop or other) within seven days after damage occurs. If at any time damage to existing presence vehicle loop detection exceeds 50%, video detection shall be installed for the entire intersection in accordance with the Special Provisions, unless otherwise approved by the Engineer. 701-11 PULL BOXES.
701-11.1 General.
a) Pull boxes shall not be installed in paved shoulder, roadway, in or within 1-foot of curb ramps.
b) Pull boxes shall be installed in the sidewalk.
c) Floor of pull box shall be grouted with a drain hole. 702-12 CONDUIT.
701-12.1 General.
Conduit types and sizes for each application shall be as specified in 700-3.5 “Conduit” of the Standard Specifications and these Special Provisions.
Unless otherwise indicated, the depth of the conduit shall be as indicated in the table below:
Location Depth Requirement
Beneath Streets and
Driveways
42-inches below finished surface or 6-inches
below the deepest structural section
Back of Curb and Gutter 30-inches below top of curb
If conduits cannot be installed at required depths: Conduits shall be installed at the maximum allowable depth and encased with a minimum of 3” of concrete, unless otherwise specified by the Engineer. Conduits shall not be installed deeper than 66- inches.
All conduits shall be free from defects including non-circularity, foreign inclusions, etc. It shall be nominally uniform (as commercially practical) in color, density, and physical properties.
All conduits furnished, as part of the Contract shall be new, UL-listed, and meet NEMA and NEC requirements pertaining to electrical conduits and components. 701-13 WIRES, CONDUCTORS AND CABLES.
701-13.1 General.
The service feed from the service pull box to the electrical service shall have a tag at both ends identifying them as “City of Gardena Service Conductors.” All individual conductors shall be labeled in the cabinet per NEMA numeric format. Conductor insulation colors and wire sizes shall be in accordance with the State Standard Specifications Section 86.2.08A, “Conductor Identifications,” except as required herein.
The conditions of this subsection shall apply to all new traffic signal installations and modifications where entire signal conductor legs are re-pulled.
New traffic signal field conductors shall be multi-conductor signal cable and individual wires as specified herein and in accordance with the State Standard Specifications Sections 86-2.08D, “Signal Cable,” and 86-2.08B, “Multiple Circuit Conductors.” New traffic signal field conductors used for phase indications and buttons shall be State standard 12CSC, 5CSC, and 3CSC multi-conductor signal cable. IMSA cable shall not be utilized. Each signal cable shall be one continuous cable from the signal cabinet to the terminal block on the signal standard it services. No splicing of signal cable shall be permitted. The signal cables shall be labeled in each pull box, per the State Standard Specifications Section 86-2.08D, and at the signal cabinet, indicating the signal standard to which it is connected. 3 spare #14 conductors shall be provided for each pole.
Primary and secondary signal standards shall receive one 12CSC cable for vehicle and pedestrian indications and one 3CSC cable for each button circuit. Additional 5CSC cable shall be furnish and installed for each additional vehicle phase serviced by the pole. All 12 CSC cable conductors shall terminate on the terminal block. The 3CSC cables shall service the buttons directly. The 12CSC conductor utilization shall be in accordance with the State Standard Specifications Section 86-2.08D, with the black conductors reserved as spares. The 3CSC conductor utilization shall be blue/black stripe for pedestrian buttons, blue/orange stripe for bike buttons, and white/black stripe for common.
TP-40
TP-41
Pedestrian signal standards shall receive one 5CSC and one 3CSC cable. The 5CSC cable shall service the pedestrian indication and the 3CSC cable shall service button circuits.
Conductors and cables shall be as defined in the State Standard Specifications Section 86-2.08 “CONDUCTORS AND CABLES” and the Special Provisions. a) When new conductors are added to or existing conductors removed from an existing conduit, all conductors shall be removed. The conduit is to be cleaned and blown out to ensure it is free of obstructions and debris. All copper cables shall have 3-feet to 5- feet coiled in each pull box to allow for servicing.
b) Each multi-conductor cable shall be one continuous cable from the signal cabinet to the terminal block on the signal standard it services. No splicing of multi-conductor cable shall be permitted.
c) All cables and conductors shall be neatly arranged, and wire tied as necessary to give a neat, finished appearance in all pull boxes, cabinets and termination points. d) All cables are to be pulled by hand. Winches or power activated pulling equipment shall not be used in accordance with State Standard Specifications 86-2.05C.
e) All cables and conductors shall be pulled in the conduit as one unit per State Standard Specifications 86-2.09B.
701-13.2 Splices.
Splicing and termination of traffic signal conductors shall be pursuant to the State Standard Specifications Section 86-2.09D, “Splicing and Terminations.” Line item 5 of the State Standard Specifications Section 86-2.09D shall not apply.
Conductors for internally illuminated street name sign (IISNS) and Luminaire circuits may be spliced to branch the circuits as they progress around the intersection. 701-16 STREET LIGHTING CONSTRUCTION.
701-16.7 Luminaries.
Luminaires mounted to traffic signal standards shall have an in-line 5-amp dual fuse (240v) in a fuse holder (Tron HEB AA) within the pull box closest to the corresponding traffic signal pole foundation per the State Standard Specifications Section 86-2.09F, “Fused Splice Connectors.”
Luminaires shall have a shorting cap unless shown otherwise on the plans. 701-17 TRAFFIC SIGNAL CONSTRUCTION
701-17.1 General.
Per the State Standard Specifications Section 86-1.07 “Scheduling of work”, the initial turn on shall be made between the hours of 9:00 a.m. and 2:00 p.m. Turn on shall occur on any working day except Friday or the day preceding a legal holiday. Prior to turn-on, all equipment as shown on the plans shall be installed and operable including pedestrian signals, pedestrian push buttons, vehicle detectors, communications to the Traffic Management Center (TMC), lighting, signs and pavement delineation. All louvers, visors and signal faces shall be directed to provide maximum visibility.
TP-42
The Engineer shall be notified at least three working days prior to the intended traffic signal turnon. The Contractor shall not proceed with the turn-on without the presence of the Engineer or his representative. The Contractor shall arrange to have a signal technician, qualified to work on the controller and employed by the traffic signal controller cabinet manufacturer or his representative, present at the time of turn-on to verify operation of the equipment.
Contractor to provide Portable Changeable Message Sign trailers to provide notice of upcoming signal activation.
Message to say:
Screen 1
"NEW SIGNAL AHEAD"
Screen 2
"USE CAUTION"
PCMS trailers shall be activated on all intersection approaches for 2 weeks prior to scheduled turn on.
Pre-installation configuration and testing: Traffic signal cabinet assemblies, conflict monitor, controller, EVP, Edge connect cards, network communications switches, and IP CCTV system shall be delivered to the Agency lab or Agency Testing Vendor as one complete shipment at least twenty-one (21) working days before installation for configuration and testing by Agency Representatives. Testing will be 100 hour bench test.
The City of Gardena will provide the following support for new or modified intersection construction.
One (1) – Pre-turn-on inspection:
All equipment must be present, wired and operational with the exception of EVP. EVP equipment will be installed and tested as operational during the turn on process by the manufacture or representative.
One (1) – Turn-on inspection:
Inspection shall be day of the turn on scheduled with the inspection team following guidelines set forth in State Standard Specifications Section 86-1.07 Any subsequent inspections will be charged by the hour at the contractors’ expense. 701-17.3 Conduit.
a) Conduits terminating within the pull box either from the bottom or side shall terminate no less than 1” above and no more than 2” above the slurry base within. b) All new intersections shall include separate conduits for Signal Interconnect Cable (SIC) and signal wiring Detector Lead in Cable (DLC). c) Sharing of the DLC and IP-CCTV wiring in the same conduits with SIC is allowedon intersection modifications where conduit fill is less than and will not exceed 40%upon completion.
d) The ends of all conduits shall have Carlon or approved equal bell fittings with conduit sealing compound to prevent dirt and rock from entering conduit. e) Existing underground conduit to be utilized for a new or modified system shall be cleaned with a mandrel or cylindrical wire brush and blown out with compressed air to ensure structural integrity and cleanliness.
f) All interconnect conduits shall contain a No. 10 green insulated solid copper trace wire. All other conduits shall contain a Green Insulated AWG#8 solid copper bonding wire, which shall be soldered and crimped in each pull box per the State Standard Specifications Section 86-2.09D, and connected to the ground bar in the traffic signal cabinet.
g) All empty conduits for future conductors shall contain "mule tape" pull tape per the State Standard Specifications Section 86-2.05C.
h) All “Pot-holing” within the street to determine subsurface utility locations shall be backfilled and patched to be in accordance with the Greenbook 2021, including all its subsequent amendments.
701-17.4 Wiring, Conductors, and Cables.
701-17.4.1 General.
The copper service feed wires from the service pull box to the electrical service shall have a tag at both ends identifying them as “City of Gardena Service Conductors” to power company officials.When new conductors are added to or existing conductors removed from an existing conduit, all conductors shall be removed. The conduit is to be cleaned and blown out to ensure it is free of obstructions and debris. All copper cables shall have 3-feet to 5-feet coiled in each pull box to allow for servicing.
Each multi-conductor cable shall be one continuous cable from the signal cabinet to the terminal block on the signal standard it services. No splicing of multi-conductor cable shall be permitted.
All cables and conductors will be neatly arranged, and wire tied as necessary to give a neat, finished appearance in all pull boxes, cabinets and termination points.
All cables are to be pulled by hand. Winches or power activated pulling equipment is not allowed per State Standard Specifications 86-2.05C.
All cables and conductors shall be pulled in the conduit as 1 unit per State Standard Specifications 86-2.09B.
Whenever conductors or cables are installed or replaced in a conduit, the ends of the conduit shall have sealing compound applied to inhibit dirt and rock intrusion. 701-17.4.2 Conductor Splicing and Termination.
Splicing and termination of traffic signal conductors shall be pursuant to the State Standard Specifications Section 86-2.09D, “Splicing and Terminations.” Line item 5 of the State Standard Specifications Section 86-2.09D shall not apply.
All individual conductors shall be labeled in the cabinet per NEMA numeric format. Conductor insulation colors and wire sizes shall be in accordance with the State Standard Specifications Section 86.2.08B, “Conductor Identifications,” except as required herein.
TP-43
TP-44
The conditions of this subsection shall apply to all new traffic signal installations and modifications where entire signal conductor legs are re-pulled.
New traffic signal field conductors shall be multi-conductor signal cable and individual wires as specified herein and in accordance with the State Standard Specifications Sections 86-2.08D, “Signal Cable,” and 86-2.08C “Circuit Conductors.”
New traffic signal field conductors used for phase indications and buttons shall be State standard 12CSC, 5CSC, and 3CSC multi-conductor signal cable. IMSA cable shall not be utilized. Each signal cable shall be one continuous cable from the signal cabinet to the terminal block on the signal standard it services. No splicing of signal cable shall be permitted. The signal cables shall be labeled in each pull box, per the State Standard Specifications Section 86-2.08D, and at the signal cabinet, indicating the signal standard to which it is connected.
Primary and secondary signal standards shall receive one 12CSC cable for vehicle and pedestrian indications and one 3CSC cable for each button circuit. An additional 5CSC cable shall be furnished and installed for each additional vehicle phase serviced by the pole. All 12 CSC cable conductors shall terminate on the terminal block. The 3CSC cables shall service the buttons directly. The 12CSC conductor utilization shall be in accordance with the State Standard Specifications Section 86-2.08D, with the black conductors reserved as spares. The 3CSC conductor utilization shall be blue/black stripe for pedestrian buttons, blue/orange stripe for bike buttons, and white/black stripe for common.
Pedestrian signal standards shall receive one 5CSC and one 3CSC cable. The 5CSC cable shall service the pedestrian indication and the 3CSC cable shall service button circuits.
Conductors and cables shall be as defined in the State Standard Specifications Section 86-2.08 “CONDUCTORS AND CABLE.” Conductors for internally illuminated street name sign (IISNS) and Safety Lighting circuits may be spliced to branch the circuits as they progress around the intersection.
Additional conductors must be installed for audible pedestrian button systems, IP- CCTV, and emergency vehicle preemption systems. Please refer to subsections 700-
5.9, 700-5.10 and 700-5.12 of these Special Provisions for additional conductor requirements of these systems.
When new conductors are added or existing conductors are removed from existing conduits, all existing conductors shall be removed per the State Standard Specifications Section 86-2.09B, “Installation.” The conduit shall be cleaned as provided in the State Standard Specifications Section 86-2.05C, “Installation.” Both old and new conductors, as shown on the plans, shall be pulled into the conduit as a unit, unless otherwise approved by the Engineer. 701-17.5 Signal Heads.
701-17.5.1 General.
All 1A pole mounted traffic signal heads shall be Type TV-1-T or TV-2-T, and pedestrian heads shall be clamshell side-mount Type SP-1-CS or top-mount TP-1-T or Side Mount SP-1- T – Bronze Mount . Vehicle and pedestrian heads shall be visible from all normal operational directions, without obstructions.
701-17.6 Detectors.
701-17.6.1 General.
Side Street Detection: Where a single phase is used on a side street approach, and both through (right turn) and left turn lanes are present, the left turn lane shall use phase 3 and/or 7 detection channels to facilitate future independent left turn phasing. Left turn lane detection shall output to the associated through phase.
Side Street Right Lane Presence: To facilitate right turn delay functionality in the 2070 controller, the 5 phase 4 and 5 phase 8 channels shall be exclusively used to serve the right-most stop bar detection loops on side street approaches. These detection channels shall not be combined with any other presence channels.
Single Lane/No Advance: Where a side street has only one lane of traffic, and no advance detection is installed, the loop configuration will consist of four Type-E loops or video detection zones. The front pair, closest to the stop bar, shall use channels 5 phase 4 or 5 phase 8 and be configured for delay capability as noted above. The back pair, farthest from the stop bar, shall use channels 4 phase 4 or 4 phase 8, configured as standard presence detection. 701-17.6.3. Inductive Loop Detectors.
701-17.6.3.1 General. Inductive loop detection shall be utilized only for advance detection on all new traffic signal modifications involving replacement of less than 50% of existing presence (limit line) detection loops may retain inductive loop detectors unless otherwise specified in project plans or at the direction of the Engineer.
All detection loops shall be 6-foot diameter Type E installed per the State Standard Plans ES-5A and ES-5B using Type 2 loop wire, unless otherwise approved by the Engineer. Elongated, oval shaped, loops may be installed to accommodate lanes over 12 feet in width.34 Detector loops shall be installed in a saw-cut slot with a minimum of 3 inches depth below the finished pavement surface, and minimum 2 inches of sealant covering the loop wires. All detection loops shall be sealed with hot melt adhesive.
Where two or more loops are to be on one channel of detection, or to a single DLC, the loops shall be connected in series.
ADD:
701-17.6.3.1.1 Presence Loops. Presence Loops (less than 50% replacement): There shall bea maximum of two through loops for each presence detection channel. For each through lane up to 12 feet in width, there shall be two 6-foot diameter loops placed ten feet apart, in the direction of travel. The Engineer shall approve all other loop sizes. Each presence loop shall have three turns.
Presence Loop Placement (less than 50% replacement): All presence loops shall be installed with the leading edge positioned one foot before the limit line, or the stop bar, in the direction of travel. All presence loop home run detection wires shall be located ahead of the loops, within the crosswalk, or as directed by the City Traffic Engineer. The left turn lanes shall have four loops, with the one DLC for the front and back loops
TP-45
ADD:
701-17.6.3.3.2 Advance Loops. Advance detection loops shall be a single loop per lane with one DLC per loop. Each advanced loop shall be assigned to a separate detection channel. Each advance loop shall have four turns where the total length of the DLC is less than 500 feet; otherwise, five turns are required.
ADD:
701-17.6.3.3.4 Conductors. Conductor and cables shall be identifiable per State Standard 86-2.08B and labeled per State Standard 86-2.08D ADD:
701-17.6.4 Video Detectors. The term “video detection system” shall be defined as a complete installation consisting of one or more video cameras, one or more video processors, extension modules and Input/ Output (I/O) modules, a remote communications module, LCD display monitor, configuration device, mounting hardware, cabling, and any required interfacing equipment, providing the detection of vehicles and bicycles solely from visual image information. 701-17.6.4.1 Temporary Video Detection. Where temporary detection is required due to road construction activity or extended overhead wiring, video detection shall be installed before construction commences to ensure continuous operation of the presence detection. After construction, any temporary camera systems shall be removed, and the entire intersection presence detection shall be converted to permanent video detection per the above specifications.
701-17.8 Payment.
Sections 701-17.2.7, 701-17.5.6, 701-17.6.6, and 701-17.7.5 are hereby deleted and replaced with the following:
Payment for Install Type E Traffic Loops for eastbound Artesia at Vermont shall be at the contract unit price per Each and shall include full compensation for phasing, temporary traffic signals, removals, replacements, 2” steel conduits, backfill and pavement restoration, labor, materials, tools, equipment and incidentals necessary to restore vehicle detection as described herein. No additional compensation shall be allowed therefore.
Loop installation at the intersections of Artesia Boulevard and Gardena Market Place, Artesia Boulevard and Dalton Avenue, Artesia Boulevard and Normandie Avenue, Artesia Boulevard and Gateway, and Artesia Boulevard and Shopping Center shall be considered included in the Contract Lump Sum price for TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND GARDENA MARKET PLACE, TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND DALTON AVENUE, TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND NORMANDIE AVENUE, TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND GATEWAY, and TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND SHOPPING CENTER, respectively.
NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR ADDITIONAL MOVE-INS REQUIRED TO CONFORM WITH PHASING SEQUENCING.
Payment for TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND GARDENA MARKET PLACE, TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND DALTON AVENUE, TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND NORMANDIE AVENUE, TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND GATEWAY, and TRAFFIC SIGNAL MODIFICATION – ARTESIA BOULEVARD AND TP-46
TP-47
SHOPPING CENTER will be at the contract Lump Sum price and shall include full compensation for all labor, equipment and materials to construct the work complete in place including installation of temporary traffic signal poles, and/or temporary wiring to maintain traffic signal in operation during construction, cabinet assembly on new foundation, poles, luminaires, heads, pedestrian push button, pole removals, all necessary potholes, conduits, pull boxes, rewiring, emergency vehicle preemption system, video detection, relocating battery backup system, relocating wireless ethernet radio, and no additional compensation will be allowed therefore.
PART 8 – LANDSCAPING AND IRRIGATION
See Technical Specification Sections 45 through 49.
801-8 PAYMENT. Delete the entire section and replace with the following:
Payment for LANDSCAPE IMPROVEMENTS shall be at the contract Lump Sum price and shall include full compensation for all labor, equipment and materials to construct the work complete in place including clearing and grubbing, weed abatement, removal of existing median concrete or pavers or asphalt nosing and maintenance strip, soil preparation, fine grading, organic mulch, shrubs, trees, groundcovers, root barriers, 90-day establishment / maintenance allowance, and no additional compensation will be allowed therefore.
Payment for IRRIGATION IMPROVEMENTS shall be at the contract Lump Sum price and shall include full compensation for all labor, equipment and materials to construct the work complete in place including, rotator sprinklers, remote control valves, decoders, landscape dripline and appurtenances, quick couplers, gate vales, master valves, reduced pressure backflow preventers, controller assemblies, flow sensors, pull boxes, water meter, lateral lines, pressure mainline, boring or trenching and backfill, sleeving, 2-wire cable, control wire, and no additional compensation will be allowed therefore.
Payment for COBBLE FIELD PAVING shall be at the contract Lump Sum price and shall include full compensation for all labor, equipment and materials to construct the work complete in place including, preparation of subgrade, concrete bedding, cobble installation, wire brush grout joints and cleaning of final installation, and no additional compensation will be allowed therefore.
SECTION 45 LANDSCAPE FINISH GRADING
1. GENERAL
1.01 SUMMARY
A. The requirements of this Specification Section replace the requirements of the "Greenbook" Standard Specifications for Public Works Construction. Delete Section 800 and Section 801.
1.02 GENERAL
A. The requirements of the “Special Provisions” and “Technical Provisions”, shall apply to all work of this Section with the same force and effect as though repeated in full herein.
1.02 DESCRIPTION
A. Work Included:
Furnish all labor, materials, equipment, appliances and necessary incidentals for the complete installation of all landscape finish grading as shown on the Drawings and as specified herein.
1. Finish Grading:
Finish grading shall consist of finishing surfaces by raking smoothly and evenly and disposal of all extraneous matter to facilitate natural run-off water. All extraneous matter shall be disposed of off the site.
2. Moisture Content:
The soil shall not be worked when the moisture content is so great that excessive compaction will occur; nor when it is so dry that a dust will form in the air or that clods will not break readily. Water shall be applied, if necessary, to provide ideal moisture content for tilling and for planting herein specified.
B. Related Work In Other Sections:
1. Irrigation Section 46
2. Landscape Planting Section 48
3. Tree and Plant Protection Section 47
1.03 SITE CONDITIONS
A. Verification of Existing Conditions:
1. The contractor shall visit the site to determine existing conditions, including access to the site and the nature and extent of existing improvements upon adjacent public and private property, nature of existing and proposed utilities, buildings, and site construction elements and to be encountered and other factors that may affect the work of this section.
2. Additional compensation resulting from the alleged ignorance of local conditions, and their effect upon the cost of the work shall subsequently not be approved.
B. Protection:
1. The contractor shall protect the City’s property from injury or loss. All damage to existing property (buildings, utilities, etc.) or planting (trees, shrubs, lawn or ground cover) caused by the contractor during his operation or as a result of the failure or malfunction of installed work during the guarantee period shall be repaired at Contractor’s expense.
2. The contractor shall cause minimum interference with workmen, materials, or other equipment of other trades on the project.
2. PRODUCTS
No materials are required of this section
EXECUTION
3.01 GENERAL
A. Inspection:
1. Prior to commencing work required by this section, the contractor shall inspect the work of other trades and verify that such work has been properly completed and installed and that the grades within the area to be planted are within .10 foot of the required finish grade elevation. If the contractor finds the planting areas to be deficient in any manner he/she will notify the Landscape Architect prior to starting work.
2. The contractor shall verify that all landscape finish grading may be installed in accordance with the requirements of all governing authorities, the original design, and the referenced standards.
B. Discrepancies:
1. In the event of discrepancy, the contractor shall immediately notify the City.
2. Do not proceed with the installation in these areas of discrepancy until all such discrepancies have been fully resolved.
3.02 PERFORMANCE
A. Finish Grading:
1. General:
When preliminary (rough) grading are complete and the soil has dried sufficiently to be readily worked, all planting areas shall be graded to the elevations indicated on the drawings or feather graded to meet existing grade at <10:1 gradient. Before and during preliminary fine grading, dig out and remove all weeds and grasses. Dispose of off-site. Grades not otherwise indicated shall be uniform levels or slopes between points where elevations are given. Upon completion of the finish grading the contractor shall request a site observation/walk-through at which time minor adjustments of finish grades shall be made at the direction of the landscape architect, if and as required. Finish grade shall be smooth, even, and uniform plane with no abrupt change of surface. Soil areas adjacent to building shall slope away from the buildings at a minimum gradient of 2% to allow for a natural run-off of water toward drain inlets. Surface drainage shall be directed as indicated on the civil drawings by remodeling surfaces to facilitate the natural run-off water. Low spots and pockets shall be graded to drain properly.
2. Preparation:
After irrigation installation and prior to commencing planting operations the contractor shall remove stones, clumps, stumps or other deleterious matter 1” in diameter or larger as well as other discarded construction materials and trash including wire, plastic and similar materials from all planter areas that could affect planting establishment and maintenance.
3. Shrubs and Ground Cover:
The finish grade of all shrubbery and ground cover areas shall be 1-1/2 in. below the grade of adjacent paving, sidewalks, bands, curbs, valve boxes, headers, clean-outs, manholes etc. An exception to the above requirements shall be made wherever drainage conditions may require flush grades as required by the design, Architect or Landscape Architect. City codes shall be consulted by the contractor and shall take precedence regarding the required distance between finish floor and finish grade in areas where shrub and ground cover areas are adjacent to Building walls.
4. Drainage:
The contractor is to finish grade the planting areas with proper slope to drains. All planter areas shall be graded and maintained to allow free flow of surface water away from buildings, paving, public walkways, and shall conform to City codes and requirements and the intent of all plans and sections. The contractor is responsible for making himself familiar with the applicable City codes and requirements.
5. Remove or redistribute excess soil before the application of fertilizer and/or planter bed mulch.
6. Contractor is responsible for the elimination of all erosion scars prior to commencing the Landscape Maintenance period.
B. Site Observations:
1. All site observations herein specified shall be made by the Landscape Architect.
Request site observations at least twenty-four hours in advance of the time inspection is desired allowing for sufficient time to complete all required adjustments prior to commencing planting operations. Inspection is required as follows:
a. When finish grading is complete as per Landscape Planting Specifications.
C. Disposal of Excess Soil:
Dispose of any unacceptable or excess soil at an offsite location approved by City.
END OF SECTION 45
SECTION 46 IRRIGATION
1. GENERAL
1.01 SUMMARY
A. The requirements of this Specification Section replace the requirements of the "Greenbook" Standard Specifications for Public Works Construction. Delete Section 800 and Section 801.
1.02 GENERAL
A. The requirements of the “Special Provisions” and “Technical Provisions”, shall apply to all work of this Section with the same force and effect as though repeated in full herein.
1.03 DESCRIPTION
A. Scope of work: Provide all labor, materials, transportation, and services necessary to furnish and install irrigation systems as shown on the drawings and described herein.
B. Related work in other Sections:
1. Landscape Finish Grading Section 45
2. Landscape Planting Section 48
3. Tree and Landscape Preservation Section 47
4. Landscape Maintenance- Section 49
1.04 QUALITY ASSURANCE AND REQUIREMENTS
A. Permits and fees: The Contractor shall obtain and pay for any and all permits and all inspections as required.
B. Manufacturer's directions: Manufacturer's directions and detailed drawings shall be followed in all cases where the manufacturers of articles used in this contract furnish directions covering points not shown in the drawings and specifications.
C. Ordinances and regulations: All local, municipal and state laws, rules and regulations governing or relating to any portion of this work are hereby incorporated into and made a part of these specifications, and their provisions shall be carried out by the Contractor.
Anything contained in these specifications shall not be construed to conflict with any of the above rules and regulations or requirements of the same. However, when these specifications and drawings call for or describe materials, workmanship, or construction of a better quality, higher standard, or larger size than is required by the above rules and regulations, the provisions of these specifications and drawings shall take precedence.
D. Explanation of drawings:
1. Due to the scale of drawings it is not possible to indicate all offsets, fittings, sleeves, etc. which may be required. The Contractor shall carefully investigate the structural and finished conditions affecting all of his work and plan his work accordingly, furnishing such fittings, etc. as may be required to meet such conditions. Drawings are generally diagrammatic and indicative of the work to be installed in such a manner as to avoid conflicts between irrigation system, planting and utility features.
2. The word, "Authorized Representative" as used herein shall refer to the City's Project Manager or Construction Management Consultant.
3. All work called for on the drawings by notes or details shall be furnished and installed whether or not specifically mentioned in the specifications.
4. The Contractor shall not willfully install the irrigation system as shown on the drawings when it is obvious in the field that obstructions, grade differences or discrepancies in area dimensions exist that might not have been considered in engineering. Such obstructions or differences should be brought to the attention of the City's authorized representative. In the event this notification is not performed, the irrigation Contractor shall assume full responsibility for any revision necessary.
1.05 SUBMITTALS
A. Materials list:
1. The Contractor shall furnish the articles, equipment, materials or processes specified by name in the drawings and specifications. No substitution will be allowed without prior written approval by the Authorized Representative.
2. A complete material list shall be submitted prior to performing any work. The material list shall include the manufacturer, model number and description of all materials and equipment to be used.
3. Equipment or materials installed or furnished without prior approval by the Authorized Representative may be rejected and the Contractor required to remove such materials at his own expense.
4. The approval of any item, alternate or substitute indicates only that the product or products apparently meet the requirements of the drawings and specifications on the basis of the information or samples submitted.
5. The manufacturer's warranties shall not relieve the Contractor of his liability under the guarantee. Such warranties shall only supplement the guarantee.
B. Record and as-built drawings as required by City:
1. The Contractor shall provide and keep up-to-date a complete as-built record set of bond prints which shall be corrected daily and show every change from the original drawings and specifications and the exact as-built locations, sizes and kinds of equipment. Prints for this purpose may be obtained from the Authorized Representative / Engineer at cost. This set of drawings shall be kept on the site and shall be used only as a record set.
2. These drawings shall also serve as work progress sheets and shall be the basis for measurement and payment for work completed. These drawings shall be available at all times for inspection and shall be kept in a location designated by the Authorized Representative. Should the record set bond copies or as-built progress sheets not be available for review or up-to-date at the time of any inspection (refer to section
3.10 - Inspection Schedule), it will be assumed no work has been completed and the Contractor will be assessed the cost of that site visit at the current billing rate of the Engineer. No other inspection shall take place prior to payment of that assessment.
3. The Contractor shall make neat and legible notations on the as-built progress sheet daily as the work proceeds, showing the work as actually installed. For example, should a piece of equipment be installed in a location that does not match the plan, the Contractor must indicate that the equipment has been relocated in a graphic manner so as to match the original symbols as indicated in the irrigation legend. The relocated equipment and dimensions will then be transferred to the original as-built plan at the proper time.
4. Before the date of the final inspection the Contractor shall transfer all information from the as-built prints to bond material procured from the Authorized Representative. The dimensions shall be made so as to be easily readable even on the final controller chart (see section C). The original as-built plan shall be submitted to the Authorized Representative for approval prior to the making of the controller chart.
5. The Contractor shall dimension from two (2) permanent points of reference, building corners, sidewalk or road intersections etc. the location of the following items:
a. Connection to existing water lines.
b. Connection to existing electrical power.
c. Gate valves.
d. Routing of sprinkler pressure lines (dimension max. 100' along routing). e. Sprinkler control valves.
f. Routing of control wiring.
g. Quick coupling valves.
h. Other related equipment as directed by the Authorized Representative.
6. On or before the date of the final inspection the Contractor shall deliver the corrected and completed bond copies to the Authorized Representative. Delivery of the bond copies will not relieve the Contractor of the responsibility of furnishing required information that may be omitted from the prints.
C. Controller charts:
1. As-built drawings shall be approved by the Engineer before controller charts are prepared. Engineer will draft Record Drawings from As-builts and provide pdf copies back to contractor for his/her preparation of controller charts.
2. Provide one controller chart for each controller supplied.
3. The chart shall show the area controlled by the automatic controller and shall be the maximum size which the controller door will allow.
4. The chart is to be a reduced drawing of the actual as-built system. However, in the event the controller sequence is not legible when the drawing is reduced, it shall be enlarged to a size that will remain legible when reduced.
5. The chart shall be bond print and a different color shall be used to indicate the area of coverage for each station.
6. When completed and approved, the chart shall be hermetically sealed between two pieces of plastic, each piece being a minimum of 10 mils.
7. These charts shall be completed and approved prior to final inspection of the irrigation system.
D. Operation and maintenance manuals:
1. Prepare and deliver to the Authorized Representative within ten calendar days prior to completion of construction, two hard cover binders with three rings containing the following information:
a. Index sheet stating Contractor's address and telephone number, list of equipment with name and address of local manufacturer's representative. b. Catalog and parts sheet on every material and equipment installed under this contract.
c. Guarantee statement.
d. Complete operating and maintenance instruction on all major equipment.
2. In addition to the above mentioned maintenance manuals, provide the City's maintenance personnel with instructions for major equipment and show evidence in writing to the Authorized Representative at the conclusion of the project that this service has been rendered.
E. Equipment to be furnished:
1. Supply as a part of this contract the following tools: Not a Part
2. The above mentioned equipment shall be turned over to the City at the conclusion of the project. Before final inspection can occur, evidence that the City has received material must be shown to the Authorized Representative.
1.06 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Handling of PVC pipe and fittings: The Contractor is cautioned to exercise care in handling, loading, unloading and storing of PVC pipe and fittings. All PVC pipe shall be transported in a vehicle which allows the length of the pipe to lie flat so as not to subject it to undue bending or concentrated external load at any point. Any section of pipe that has been dented or damaged will be discarded and, if installed, shall be replaced with new piping.
1.07 SUBSTITUTIONS
A. If the irrigation contractor wishes to substitute any equipment or materials for the equipment or materials listed on the irrigation drawings and specifications, he may do so by providing the following information to the City's authorized representative for approval:
1. Provide a statement indicating the reasons for making the substitution. Use a separate sheet of paper for each item to be substituted.
2. Provide descriptive catalog literature, performance charts and flow charts for each item to be substituted.
3. Provide the amount of cost savings if the substituted item is approved.
B. The City's authorized representative shall have the sole responsibility in accepting or rejecting any substituted item as an approved equal to the equipment and materials listed on the irrigation drawings and specifications.
1.08 GUARANTEE
A. The guarantee for the sprinkler irrigation system shall be made in accordance with the attached form. The general conditions and supplementary conditions of the specifications shall be filed with the City or his representative prior to acceptance of the irrigation system.
B. A copy of the guarantee form shall be re-typed onto the Contractor's letterhead and contain the following information:
GUARANTEE FOR SPRINKLER IRRIGATION SYSTEM
We hereby guarantee that the sprinkler irrigation system we have furnished and installed is free from defects in materials and workmanship, and the work has been completed in accordance with the drawings and specifications, ordinary wear and tear and unusual abuse, or neglect excepted. We agree to repair or replace any defects in material or workmanship which may develop during the period of one year from date of acceptance and also to repair or replace any damage resulting from the repairing or replacing of such defects at no additional cost to the City. We shall make such repairs or replacements within a reasonable time, as determined by the City, after receipt of written notice. In the event of our failure to make such repairs or replacements within a reasonable time after receipt of written notice from the City, we authorize the City to proceed to have said repairs or replacements made at our expense and we will pay the costs and charges therefore upon demand.
PROJECT: _____________________________________
LOCATION: ___________________________________
_______________________________________________
SIGNED: ______________________________________
ADDRESS:.___________________________________
_______________________________________________
PHONE: _______________________________________
DATE OF ACCEPTANCE: ______________________
2. PRODUCTS
2.01 MATERIALS
A. General: Use only new materials of brands and types noted on drawings, specified herein or approved equals.
B. PVC pressure mainline pipe and fittings:
1. Pressure mainline piping for sizes 1 ½” and smaller Schedule 40 PVC, for 2" to 3” shall be Class 315 PVC and 4” and larger SDR21 PVC.
2. Pipe shall be made from NSF approved Type I, Grade I, PVC compound conforming to ASTM resin specification D1784. All pipe must meet requirements as set forth in Federal Specification PS-22-70, with an appropriate standard dimension (S.D.R.) (Solvent-weld Pipe).
3. Pressure mainline piping for sizes 1-1/2" and smaller shall be PVC Schedule 40 with solvent welded joints.
4. PVC solvent-weld fittings shall be schedule 40, 1-20, II-I NSF approved conforming to ASTM test procedure D2466.
5. Solvent cement and primer for PVC solvent-weld pipe and fittings shall be of type and installation methods prescribed by the manufacturer.
6. All PVC pipe must bear the following markings:
a. Manufacturer's name
b. Nominal pipe size
c. Schedule or class
d. Pressure rating in P.S.I.
e. NSF (National Sanitation Foundation) approval
f. Date of extrusion
7. All fittings shall bear the manufacturer's name or trademark, material designation, size, applicable I.P.S. schedule and NSF seal of approval.
C. PVC non-pressure lateral line piping:
1. Non-pressure buried lateral line piping shall be PVC Schedule 40 with solvent-weld joints.
2. Pipe shall be made from NSF approved, Type I, Grade II PVC compound conforming to ASTM resin specification D1784. All pipe must meet requirements set forth in Federal Specification PS-22-70 with an appropriate standard dimension ratio.
3. Except as noted in paragraphs 1 and 2 of section 2.01B, all requirements for nonpressure lateral line pipe and fittings shall be the same as for solvent-weld pressure mainline pipe and fittings as set forth in section 2.01B of these specifications.
D. Control wiring:
1. If/as specified, provide “Add-a-Zone” Kits to establish wiring for new valves. a. Mfr: R Co. Parts, Pleasanton Ca. Model #RCO 860009 or equal.
2. Connections between the automatic controller and the electric control valves shall be made with direct burial copper wire AWG-U.F. 600 volt. Pilot wires shall be a different color wire for each automatic controller. Common wires shall be white with a different color stripe for each automatic controller. Install in accordance with valve manufacturer's specifications and wire chart. In no case shall wire size be less than #14.
3. Wiring shall occupy the same trench and shall be installed along the same route as pressure supply or lateral lines wherever possible.
4. Where more than one (1) wire is placed in a trench, the wiring shall be taped together at intervals of ten (10) feet.
5. An expansion curl shall be provided within three (3) feet of each wire connection.
Expansion curl shall be of a sufficient length at each splice connection at each electrical control, so that in case of repair, the valve bonnet may be brought to the surface without disconnecting the control wires. Control wires shall be laid loosely in trench without stress or stretching of control wire conductors.
6. All non-decoder or flow sensor splices shall be made with 3M DBY-6Kit, Rain Bird Snap-Tite wire connector or approved equal verified by manufacturer. Use one splice per connector sealing pack.
7. Field splices between the automatic controller and electrical control valve will not be allowed without prior approval of the Authorized Representative.
E. Automatic controller:
1. Refer to Drawings.
F. Electrical Control Valves:
1. All electric control valves shall be as shown on plans.
2. All electric control valves shall have a manual flow adjustment.
3. Provide and install one control box for each electrical control valve.
G. Control valve boxes:
1. In landscape areas: Use 10" x 10-1/4" round box for all gate valves, Carson Industries #910-12B with green bolt- down cover or approved equal. Extension sleeve shall be PVC -6" minimum size.
2. In Landscape Areas: Use 9 -1/2" x 16" x 11" rectangular box for all electrical control valves, Carson Industries 1419-12B with green bolt-down cover or approved equal.
3. If existing plastic yard boxes are located within Decomposed Granite pathway:
Provide Brooks concrete traffic rated box of similar size to replace plastic boxes.
H. Sprinkler Heads:
1. All sprinkler heads shall be of the same size, type and shall deliver the same rate of precipitation with the diameter (or radius) of throw, pressure, and discharge as shown on the plans and/or specified in these special provisions.
2. Spray heads shall have a screw adjustment.
3. Riser units shall be fabricated in accordance with the details shown on the plans.
4. Riser nipples for all sprinkler heads shall be the same size as the riser opening in the sprinkler body.
5. All sprinkler heads of the same type shall be of the same manufacturer.
I. Landscape Dripline:
6. Landscape dripline shall be the same type and manufacturer as indicated on the Drawings.
3. EXECUTION
3.01 INSPECTION
A. Site Conditions:
1. All scaled dimensions are approximate. The Contractor shall check and verify all size dimensions and receive Authorized Representative's approval prior to proceeding with work under this section.
2. Exercise extreme care in excavating and working near existing utilities. Contractor shall be responsible for damages to utilities which are caused by his operations or neglect. Check existing utilities drawings for existing utility locations.
3. Coordinate installation of sprinkler irrigation materials including pipe, so there shall be NO interference with utilities or other construction or difficulty in planting trees, shrubs, and groundcovers.
4. The Contractor shall carefully check all grades to satisfy himself that he may safely proceed before starting work on the sprinkler irrigation system.
3.02 PREPARATION
A. Physical layout:
1. Prior to installation, the Contractor shall stake out all pressure supply lines, routing and location of sprinkler heads.
2. All layout shall be approved by Authorized Representative prior to installation.
3. Water Supply:
4. Sprinkler irrigation system shall be connected to water supply points of connection as indicated on the drawings.
5. Connections shall be made at approximate locations as shown on the drawings.
Contractor is responsible for minor changes caused by actual site conditions.
B. Electrical Supply:
1. Electrical connections for automatic controller shall be made as shown on drawings.
2. Connections shall be made at approximate locations as shown on drawings.
Contractor is responsible for minor changes caused by actual site conditions.
3.03 INSTALLATION
A. Trenching:
1. Dig trenches straight and support pipe continuously on bottom of trench. Lay pipe to an even grade. Trenching excavation shall follow layout indicated on drawings and as noted.
2. Provide for a minimum of eighteen (18) inches cover for all pressure supply lines up to 2 1/2" size.
3. Provide for a minimum of 36" cover for all pressure supply lines 3" and larger.
4. Provide for a minimum cover of twelve (12) inches for all lateral lines.
5. Provide for a minimum cover of eighteen (18) inches for all control wiring.
B. Backfilling:
1. The trenches shall not be backfilled until all required tests are performed. Trenches shall be carefully backfilled with the excavated materials approved for backfilling, consisting of earth, loam, sandy clay, sand or other approved materials, free from large clods of earth or stones. Backfill shall be mechanically compacted landscaped areas to a dry density equal to adjacent undisturbed oil in planting areas. Backfill will conform to adjacent grades without dips, sunken areas or other surface irregularities.
2. A fine granular material backfill will be initially placed on all lines. No foreign matter larger than one-half (1/2") inch in size will be permitted in the initial backfill.
3. Flooding of trenches will be permitted only with approval of the Authorized Representative.
4. If settlement occurs and subsequent adjustments in pipe, valves, sprinkler heads, lawn or planting, or other construction are necessary, the Contractor shall make all required adjustments without cost to the City.
C. Trenching and backfill under paving:
1. Trenches located under areas where paving, asphaltic concrete or concrete will be installed shall be backfilled with sand (a layer six (6) inches below the pipe and three (3) inches above the pipe) and compacted in layers to 95% compaction using manual or mechanical tamping devices. Trenches for piping shall be compacted to equal the compaction of the existing, adjacent, undisturbed soil and shall be left in a firm, unyielding condition. All trenches shall be left flush with the adjoining grade. The sprinkler irrigation Contractor shall set the place, cap and pressure test all piping under paving prior to the paving work.
2. Generally, piping under existing pavement is done by jacking, boring or hydraulic driving, but, where any cutting or breaking of sidewalks and/or concrete is necessary, it shall be done and replaced by the Contractor as a part of the contract cost.
Permission to cut or break sidewalks and/or concrete shall be obtained from the Authorized Representative. No hydraulic driving will be permitted under concrete paving.
3. Provide for a minimum cover of eighteen (18) inches between the top of the pipe and the bottom of the aggregate base for all pressure and non-pressure piping installed under asphaltic concrete paving.
D. Assemblies:
1. Routing of sprinkler irrigation lines as indicated on the drawings is diagrammatic.
Install lines (and various assemblies) in such a manner as to conform with the details per plans.
2. Install NO multiple assemblies in plastic lines. Provide each assembly with its own outlet.
3. Install all assemblies specified herein in accordance with respective detail. In the absence of detail drawings or specifications pertaining to specific items required to complete work, perform such work in accordance with best standard practice with prior approval of the Authorized Representative.
4. PVC pipe and fittings shall be thoroughly cleaned of dirt, dust and moisture before installation. Installation and solvent welding methods shall be as recommended by the pipe and fitting manufacturer.
5. On PVC to metal connections the Contractor shall work the metal connections first.
Teflon tape or approved equal shall be used on all threaded PVC to PVC and on all threaded PVC to metal joints. Light wrench pressure is all that is required. Where threaded PVC connections are required, use threaded PVC adaptors into which the pipe may be welded.
E. Line clearance: All lines shall have a minimum clearance of six (6) inches from each other and from lines of other trades. Parallel lines shall not be installed directly over one another.
F. Automatic controller: New controller as indicated on Drawings.
G. High voltage wiring for automatic controllers:
1. 120 volt power connection to the automatic controller shall be provided by the irrigation Contractor.
2. All electrical work shall conform to local codes, ordinances and union authorities having jurisdiction.
H. Remote control valves: Install where shown on drawings and details. When grouped together, allow at least twelve (12") inches between valves. Install each remote control valve in a separate valve box. Each valve number shall be stenciled on valve box top with exterior paint and shall receive valve tag with corresponding valve number. All valve groupings shall have an isolation gate valve upstream from grouping.
I. Flushing of system:
1. After all new sprinkler pipe lines and risers are in place and connected, all necessary diversion work has been completed, and prior to installation of sprinkler heads, the control valves shall be opened and full head of water used to flush out the system.
2. Sprinkler heads shall be installed only after flushing of the system has been accomplished to the complete satisfaction of the Authorized Representative.
J. Install the sprinkler heads as designated on the drawings. Sprinkler heads to be installed in this work shall be equivalent in all respects to those itemized.
1. Spacing of heads shall not exceed the maximum indicated on the drawings. In no case shall the spacing exceed the maximum recommended by the manufacturer.
K. Install the landscape dripline as designated on the drawings.
1. Spacing of dripline shall not exceed the maximum indicated on the drawings. In no case shall the spacing exceed the maximum recommended by the manufacturer.
2. Fittings shall be of the same manufacturer as the landscape dripline tubing.
3.04 TREE ROOT PRESERVATION
A. Tree roots encountered over 2 inches in diameter shall be cut clean and painted with two coats of Tree Seal or equal. Trenches adjacent to trees should be closed within twenty four (24) hours; where this is not possible, the side of the trench adjacent to the tree shall be kept shaded with burlap or canvas. Refer to 05639 – Tree and Plant Protection for additional requirements.
3.05 FIELD QUALITY CONTROL
A. Adjustment of the system:
1. The Contractor shall flush and adjust all sprinkler heads for optimum performance and to prevent overspray onto walks, roadways and buildings as much as possible.
2. If it is determined that adjustments in the irrigation equipment will provide proper and more adequate coverage, the Contractor shall make such adjustments prior to planting. Adjustments may also include changes in nozzle sizes and degrees of arc as required.
3. Lowering raised sprinkler heads by the Contractor shall be accomplished within ten (10) days after notification by the City.
4. All sprinkler heads shall be set perpendicular to finished grades unless otherwise designated on the plans.
B. Testing of irrigation system:
1. The contractor shall request the presence of the Authorized Representative in writing at least 48 hours in advance of testing.
2. Test all pressure lines under hydrostatic pressure of 150 pounds per square inch and prove watertight.
Note: Testing of pressure mainlines shall occur prior to installation of electric control valves.
3. All piping under paved areas shall be tested under hydrostatic pressure of 150 pounds per square inch and proved watertight prior to paving.
4. Sustain pressure in lines for not less than two (2) hours. If leaks develop, replace joints and repeat test until entire system is proven watertight.
5. All hydrostatic tests shall be made only in the presence of the Authorized Representative or another duly authorized representative of the City. No pipe shall be backfilled until it has been inspected, tested and approved in writing.
6. Furnish necessary force pump and all other equipment.
7. When the sprinkler irrigation system is completed perform a coverage test in the presence of the Authorized Representative to determine if the water coverage for planting areas is complete and adequate. Furnish all materials and perform all work required to correct any inadequacies of coverage - without bringing this to the attention of the Authorized Representative - due to deviation from plans or where the system has been willfully installed as indicated on the drawings when it is obviously inadequate. This test shall be accomplished before any ground cover is planted.
8. Upon completion of each phase of work, the entire system shall be tested and adjusted to meet site requirements.
3.06 MAINTENANCE
The entire sprinkler irrigation system shall be under full automatic operation for a period of seven (7) days prior to any planting. The Authorized Representative reserves the right to waive or shorten the operation period.
3.07 CLEAN-UP
Clean-up shall be made as each portion of work progresses. Refuse and excess dirt shall be removed from the site, all walks and paving shall be broomed or washed down, and any damage sustained on the work of others shall be repaired to original conditions.
3.08 TEMPORARY REPAIRS
The City reserves the right to make temporary repairs as necessary to keep the sprinkler system equipment in operating condition. The exercise of this right by the City shall not relieve the Contractor of his responsibilities under the terms of the guarantee as herein specified.
3.09 FINAL OBSERVATION PRIOR TO ACCEPTANCE
A. The Contractor shall operate each system in its entirety for the Authorized Representative at time of final observation. Any items deemed not acceptable by the Authorized Representative shall be reworked to the complete satisfaction of the Authorized Representative.
B. The Contractor shall show evidence to the Authorized Representative that the City has received all accessories, charts, record drawings and equipment as required before final inspection can occur.
3.10 OBSERVATION SCHEDULE
A. Contractor shall be responsible for notifying the Authorized Representative in advance for the following observation meetings, according to the time indicated:
1. Pre-job conference - 7 days.
2. Pressure supply line installation and testing - 48 hours.
3. Automatic controller installation - 48 hours.
4. Control wire installation - 48 hours.
5. Lateral line & sprinkler installation - 48 hours.
6. Coverage test - 48 hours.
7. Final inspection - 7 days.
B. When observations have been conducted by other than the Authorized Representative, show evidence in writing of when and by whom these observations were made.
C. No site observations will commence without as-built drawings. In the event the Contractor calls for a site visit without as-built drawings, without completing previously noted corrections or without preparing the system for said visit, he shall be responsible for reimbursing the Authorized Representative at his current billing rates per hour portal (plus transportation costs) for inconvenience. No further site visits will be scheduled until this charge has been paid and received.
END OF SECTION 46
SECTION 47 TREE AND PLANT PROTECTION
PART 1 - GENERAL
1.1 SUMMARY
A. General: Section includes Temporary Tree and Plant Protection of existing trees and plants that are affected by the execution of the Work in accordance with Contract Documents.
B. Summary of Work: Provide all labor, equipment and materials required for the procurement, delivery and operations for temporary tree and plant protection as specified herein.
1.2 DEFINITIONS
A. Protection Zone: Area surrounding individual trees extending to the dripline, groups of trees, shrubs, or other vegetation to be protected during construction, where protect in place is noted.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Certification: From Certified Arborist, certifying that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged.
C. Maintenance Recommendations: From Certified Arborist, for care and protection of trees affected by construction during and after completing the Work.
D. Existing Conditions: Documentation of existing trees and plantings indicated to remain, which establishes pre-construction conditions that might be misconstrued as damage caused by construction activities.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Protection Zone Fencing if / as required by the City: Fencing fixed in position and meeting one of the following requirements.
1. Plastic Protection Zone Fencing: Plastic construction fencing constructed of high-density extruded and stretched polyethylene fabric with 2-inch (50-mm) maximum opening in pattern and supported by tubular or T-shape galvanized steel posts spaced not more than 8 feet (2.4 m) apart. High-visibility orange color, non-fading.
2. Height of Fencing: 4 feet.
PART 3 - EXECUTION
3.1 EXAMINATION AND PREPARATION
A. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.
3.2 EXCAVATION
A. Trenching near Trees: Where utility trenches are required within protection zones, hand excavate under or around tree roots or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots as required for root pruning.
B. Do not allow exposed roots to dry out before placing permanent backfill.
3.3 ROOT PRUNING
A. Prune roots that are affected by temporary and permanent construction.
1. Secure the services of a Certified Arborist and perform root pruning under their direction.
2. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots.
3. Temporarily support and protect roots from damage until they are permanently covered with soil.
4. Cover exposed roots with burlap and water regularly.
3.4 RE-GRADING
A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.
B. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.
C. Minor Fill within Protection Zone: Where existing grade is 2 inches (50 mm) or less below elevation of finish grade, fill with topsoil. Place topsoil in a single uncompacted layer and hand grade to required finish elevations.
3.5 FIELD QUALITY CONTROL
A. Inspections: Engage a Certified Arborist to direct plant protection measures in the vicinity of trees, shrubs, and other vegetation indicated to remain and to prepare inspection reports.
3.6 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Disposal: Remove excess excavated material, displaced trees, trash and debris, and legally dispose of them off Park property.
PART 4 - PAYMENT
4.1 PAYMENT
A. No separate Payment for Tree and Plant Protection shall be made as part of this specification.
Incidental work associated with this specification shall be paid as part of other associated bid items.
END OF SECTION 47
SECTION 48. LANDSCAPE PLANTING
1. GENERAL
1.01 SUMMARY
A. The requirements of this Specification Section replace the requirements of the "Greenbook" Standard Specifications for Public Works Construction. Delete Section 800 and Section 801.
1.02 GENERAL
A. The requirements of the “Special Provisions” and “Technical Provisions”, shall apply to all work of this Section with the same force and effect as though repeated in full herein.
1.03 SCOPE OF WORK
A. Work Included:
1. Providing and preparing soil and soil mixes.
2. Planting, including, trees, shrubs and sodded lawns.
3. Staking.
4. Tree Preservation.
B. Related Work Described Elsewhere:
1. Irrigation System Section 46
2. Tree and Plant Protection Section 47.
3. Landscape Finish Grading Section 45
4. Landscape Maintenance- Section 49
1.04 QUALITY ASSURANCE
A. Exclamation of Drawings
1. The word, "Authorized Representative" as used herein shall refer to the City's Project Manager, Construction Management Consultant or Landscape Architect.
B. Source Quality Control:
1. Submit documentation to Authorized Representative at least forty-five (45) days after award of Contract that all plant material is available. Contractor shall be responsible for all material listed on plant list. Any and all substitutions due to availability must be requested in writing prior to confirmation of ordering. All materials shall be subject to inspection by Authorized Representative at any time after confirmation of ordering.
2. Plants shall be subject to inspection and approval of Authorized Representative at place of growth or upon delivery for conformity to specifications. Such approval shall not impair the right of inspection and rejection during progress of the work. Submit written request for inspection of plant material at place of growth to Authorized Representative. Written request shall state the place of growth and quantity of plants to be inspected. Authorized Representative reserves the right to refuse inspection at this time if, in his judgment, a sufficient quantity of plants is not available for inspection.
3. The Contractor shall submit specifications of any item being used on site upon the request of the Authorized Representative.
C. Standards:
1. Provide plants and planting material meeting or exceeding specifications of Federal, State and County laws requiring inspection for plant disease and insect control.
2. Provide quality and size conforming to current edition of “Horticultural Standards” for number one nursery stock as adopted by the American Association of Nurserymen.
3. Provide plants which are true to name. Tag one of each bundle of lot with the name and size of plants in accordance with the standards of practice of the American Association of Nurserymen.
4. In all cases, botanical names shall take precedence over common names.
D. Workmanship:
Perform work in accordance with the best standards of practice for landscape work and under the continual supervision of competent foreman capable of interpreting the drawings and specifications. Quantities and types:
Plant materials shall be furnished in the quantities and / or spacing as shown or noted for each location, and shall be of the species, kinds, sizes, etc., as symbolized and / or described in the “List of Plant Materials,” all as indicated on the drawings.
E. Verification of dimensions and quantities:
All scaled dimensions are approximate. Before proceeding with any work, carefully check and verify all dimensions and quantities and immediately inform the Authorized Representative of any discrepancy between the drawings and/or specifications and actual conditions. No work shall be done in any area where there is any such discrepancy until approval for same has been given by the Authorized Representative.
F. Agricultural Soils Testing:
1. An analysis of existing on-site soil, import topsoil, is required prior to beginning planting work and purchasing the same products or materials.
2. The testing laboratory shall be Wallace Laboratories Inc. 365 Coral Circle, El Segundo, CA 90245, 310•615•0116 (or equal). Tests shall be paid for by the contractor. A minimum of (4) representative on-site soil samples shall be obtained by across the length of the project from different medians. Final amendment recommendations from agronomy laboratory shall be submitted to City for review and approval prior to installation. Recommendations shall supersede standard details.
1.05 JOB CONDITIONS
A. Perform actual planting only when weather and soil conditions are suitable in accordance with locally accepted practice.
1.06 SUBMITTALS
A. Product data:
1. Materials list of items proposed to be provided under this Section.
2. Complete data demonstrating compliance with the specified requirements. This shall not in any way be construed as permitting substitutions.
3. Submit samples of each of the materials listed in Part 2 – ‘Products’ as determined by the Authorized Representative.
B. Certification:
Provide a certificate with each delivery of bulk material, stating the source, quantity, and type of material and stating that the material conforms with the specified requirements.
1. For bulk delivered organic fertilizer, also show on the certificate of volume, net weight and percentages of nitrogen and phosphorus and potassium.
2. For other fertilizers and soil conditions in containers, show on the certificate the total quantities by weight and volume for each material.
1.07 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Delivery:
1. Deliver fertilizer to site in original unopened containers bearing manufacturer’s guaranteed chemical analysis, name, trademark, and conformance to State Law.
2. The Contractor shall furnish Authorized Representative with copies of receipts for all amendments specified in Section 2.01 Materials or amended by the required Soils Report specified in Section 1.03 F.
3. Deliver all plants with legible identification labels. a. Label trees, evergreens, bundles or containers of like shrubs, or groundcover plants.
B. State correct plant name and size indicated on plant list. a. Use durable waterproof labels with water-resistant ink which will remain legible for at least 60 days.
b. Immediately remove from the job site all plants which are not true to name, and all materials which do not comply with the specified requirements.
2. Protect plant material during delivery to prevent damage to root ball or desiccation of leaves.
3. The Contractor shall notify the Authorized Representative seven (7) days in advance of delivery of all plant materials and shall submit an itemized list of the plant in each delivery.
C. Storage:
1. Store plant material in shade and protect from weather.
2. Maintain and protect plant material not to be planted within four (4) hours in a healthy, vigorous condition.
D. Handling:
The Contractor is cautioned to exercise care in handling, loading, unloading and storing of plant materials. Plant materials that have been damaged in any way will be discarded and, if installed, shall be replaced with undamaged materials.
1.08 SAMPLES AND TESTS
Authorized Representative reserves the right to take and analyze samples of materials for conformity to specifications at any time. Contractor shall furnish samples upon request by Authorized Representative. Rejected materials shall be immediately removed from the site at Contractor’s expense. Cost of testing of materials not meeting specifications shall be paid for by Contractor.
1.09 GUARANTEE AND REPLACEMENT
Submit a written guarantee in approved form in compliance with the related requirements of General Conditions guaranteeing the work of this section against any defective materials and workmanship in compliance with the following terms, agreeing to replace any defective materials and/or workmanship at no additional cost to the owner.
A. Trees shall be guaranteed for a period of one year and shrubs, vines and ground cover for a period of six months after final approval and acceptance of the project.
B. Any plant material which dies or which is not healthy or vigorous when it has received normal care and maintenance shall be replaced within or at the end of the guarantee period and as specified in the Landscape Maintenance Specifications.
C. Any trees or other plant materials that die-back and lose the form and size as originally specified, shall be replaced even though they have taken root and are growing after the die-back.
D. The Contractor, when notified by the Authorized Representative, shall remove and replace all guaranteed plant materials which for any reason fail to meet the requirements of the guarantee. Replacement of material and plants shall be made to same specifications as required for original planting. All replacements shall be guaranteed as specified for original materials from the actual date of the planting of replacement material.
1.010 EXISTING TREES ‘TO BE PROTECTED IN PLACE’
A. When the site is ready for clearing, existing trees designated as ‘to remain’ shall be protected from land clearing equipment and construction work. Barricades shall be erected around the tree to protect the entire dripline (an imaginary perpendicular line that extends downward from the outer-most tip of the tree branches to the ground) of the tree.
B. See Section 47 – Tree and Plant Protection for additional requirements.
1.10 ROOT BARRIER REQUIREMENT
A. All trees within 5’ (eight feet) of any paving curbs, or bands (except for trees in tree grates) shall be installed with linear root barriers. Root barrier products for trees within 8’ (eight feet) of any sidewalks, curbs, gutters, and paving governed by or under the jurisdiction of the City, shall be that specified and approved by the City and shall be installed in accordance with the City’s standards and the manufacturers specifications, recommendations, and details.
1.11 TREE PLACEMENT AND LOCATION REQUIREMENTS
A. Trees shall be located not less than:
1. Twenty (20) feet back of beginning of curb returns at any street intersection.
2. Twenty (20) feet from lamp standards and power poles.
3. Ten (10) feet from fire hydrants.
4. Five (5) feet from service walks and driveways.
5. Five (5) feet from water meters.
2. PRODUCTS
2.01 Materials
A. The following organic, soil amendments and fertilizers are to be used for bid price basis only (per 1,000 s.f. basis).
(3) CY Organic nitrolized compost
(10) pounds agricultural gypsum
(75) Pounds TriC Humate Plus (Note: Humate Plus shall be part of soil amendment application regardless of whether recommended by soils laboratory) Final amendments and fertilizer specification will be made after grading operations are complete and soil samples are tested through an agronomy laboratory, see Section 1.03E.
B. All materials shall be of standard, approved and first-grade quality and shall be in prime condition when installed and accepted. Any commercially processed or packaged material shall be delivered to the site in the original unopened container bearing the manufacturer’s guaranteed analysis. Contractor shall supply Authorized Representative with a sample of all supplied materials accompanied by analytical data from an approved laboratory source illustrating compliance or bearing the manufacturer’s guaranteed analysis:
C. Organic Amendment:
Earthworks Soil Amendments, Inc. ‘Planting Mix’, 310•802•8842 or equal.
1. Planting Mix
EarthWorks Planting Mix is pre-moistened blend of carefully selected organic compost, aged forest products, premium peat moss, pumice and chicken manure which is formulated for all landscape planting applications.
D. Soil Amendment:
1. Soil Sulfur: Agricultural grade sulfur containing a minimum of 99% sulfur (expressed as elemental).
2. Iron Sulfate: 20% Iron (expressed as metallic iron), derived from ferric and ferrous sulphate, 10% sulfur (expressed as elemental).
3. Calcium Carbonate: 95% lime as derived from oyster shells.
4. Gypsum: Agricultural grade product containing 98% minimum calcium sulphate.
5. Amendment: Establish ‘by Earthworks Soil Amendment Inc., 310•802•8842.
Earthworks Establish is designated to be used as a pre-plant soil amendment and contains both soluble and insoluble nutrients for immediate and long term fertilization as follows:
Analysis: 1-1.3-6.3
1% Total Nitrogen
1.3% Available Phosphoric Acid
6.3% Soluble Potash
16% Calcium
1.5% Sulfur
.75% Iron
.06% Manganese
Derived from: Rock Phosphate, composted chicken manure, sulfate of potash, gypsum, worm castings and dairy manure compost.
E. Fertilizer:
1. Planting Fertilizer: Granular form fertilizer consisting of the following percent by weight by Earthworks
7% nitrogen
1% phosphoric acid
7% potash
2. Gro-Power Planter Pot Fertilizer: Shall be Gro-Powers’ controlled release fertilizer and soil conditioner or equal in the following percent by weight. 12% nitrogen
8% phosphoric acid
8% potash
25% humus
5% humic acid
3. Planting Tablets:
a. Each tablet shall have 17 species of Endo & Ecto Mycorrizal Inoculum b. Shall be Tri-C Myco Tabs (17-9-5) tablets as manufactured by Tri- C Natural Solutions or approved equal, applied per manufacturer’s instructions. Tablets shall be included in plant pit backfill if not recommended by soils laboratory recommendations.
4. Sulphate of potash: 0-0-50
5. Single Super-Phosphate: Commercial product containing 18-20% available Phosphoric Pentoxide, or equal.
6. Urea Formaldehyde: 38-0-0
7. Humate plus conditioner by Tri-C Enterprises, 800•927•3311.
F. Import Top Soil:
Silt plus clay content of the import soil shall not exceed 20% by weight with a minimum 95% passing the 2.0 millimeter sieve. The sodium absorption ratio (SAR) shall not exceed 6 and the electrical conductivity (ECe) of the saturation extract of this soil shall not exceed 3.0 millimhos per centimeter at 25 degrees centigrade. The boron content shall be no greater than 1 part per million as measured on the saturation extract. In order to insure conformance, samples of the import soil shall be submitted to the agricultural soils testing laboratory (see section 1.03F) for analysis prior to, and following, backfilling.
Do not obtain top soil form areas in which are growing noxious weeds such as morning glory oxalis Bermuda or nut grasses. Soil shall be free of deleterious and / or harmful substances and properties.
G. Plant Material:
C. Plants shall be in accordance with the California State department of Agriculture’s regulation for nursery inspections, rules and rating. All plant materials shall have been inspected and released by the County Agricultural inspector prior to delivery on the job.
All plants shall have a normal habit of growth and shall be sound, healthy, vigorous and free of insect infestations, plant diseases, sunscalds, fresh abrasions of the bark, excessive abrasions, or other objectionable disfigurements. Tree trunks shall be sturdy and have well “hardened” systems and vigorous and fibrous root systems which are not root or pot-bound. In the event of disagreement as to condition of root system, the root conditions of the plants furnished by the Contractor in containers will be determined by removal of earth from the roots of not less than two plants or more than two percent of the total number of plants of each species or variety. Where container-grown plants are from several sources, the roots of not less than two plants of each species or
1. variety from each source will be inspected. In case the sample plants inspected are found to be defective, the Authorized Representative reserves the right to reject the entire lot or lots of plants represented by the defective samples. The Authorized Representative is the sole judge as to acceptability. Any plants rendered unsuitable for planting because of this inspection will be considered as samples and will be provided at the expense of the Contractor.
2. The size of the plants will correspond with that normally expected for species and variety of commercially available nursery stock or as specified on drawings. The minimum acceptable size of all plants measured before pruning with the branches in normal position, shall conform with the measurements, if any, specified on the drawings in the list of plants to be furnished. Plants larger in size than specified may be used with the approval of the Authorized Representative, but the use of larger plants will make no change in Contract price. If the use of larger plants is approved, the ball of earth or spread of roots for each plant will be increased proportionately.
3. All plants not conforming to the requirements herein specified, shall be considered defective and such plants, whether in place or not, shall be marked as rejected and immediately removed from the site of the work and replaced with new plants at the Contractor’s expense. The plants shall be of the species, variety, size and conditions specified herein or as shown on the drawings. Under no conditions will there be any substitutions of plants or sizes listed on the accompanying plans, except with the express consent of the Authorized Representative.
4. Pruning:
At no time shall trees, (excluding palm trees) or plant materials be pruned, trimmed or topped prior to delivery and any alteration of their shape shall be conducted only with the approval and when in the presence of the Landscape Architect.
5. Plant Material:
Plant material shall be true to botanical and common name and variety as specified in the latest edition of the “Annotated Checklist of Woody Ornamental Plants in California, Oregon and Washington”, published by the University of California School of Agriculture.
6. Nursery Grown and Collected Stock:
a. Grown under climatic conditions similar to those in locality of project. b. Container-grown stock in vigorous, healthy condition, not root-bound or with root system hardened off.
c. Use only liner stock plant material which is well established in removable containers or formed homogenous soil section.
7. Substitute plant material will not be permitted unless specifically approved in writing by the Landscape Architect.
D. Staking Materials:
1. Wood tree stakes:
Lodge pole pine, full treated with Coppernapthanate Wood Preservative in strict accordance with Federal Spec. TT-W-572 Type 1 Composition B, 2" (mm. nominal size) diameter x 10' long, no split stakes. Stakes are to be free of loose knots or bends and are to be pointed at one end.
2. Pipe Tree Stakes:
Sch. 40 steel pipe, 1-1/2" diameter with cap, primed and painted before installation with two coats flat black exterior enamel. Touch up in field to match shop condition.
3. Ties:
a. V.I.T. Products ‘Twist brace’, 800•729•1314
TB-24 for 15 Gallon Trees
TB-36 for 24” Box Trees
TB-42 for 36” Box Trees
b. Attach to Lodgepoles using galvanized nails.
E. Tree Paint: Morrison Tree Seal, Cabort Tree paint, or equal.
F. Water: Furnished by Owner; transport as required.
G. Mulch:
1. ‘Forest Floor 0-2”’ as supplied by Aguinaga Fertilizer, 949•786•9558 or equal.
2. The mulch shall consist of a woody bark material 2 inches or less in size.
3. Compact grades adjacent to edging to avoid settling.
H. Tree transplant stimulant”
1. ‘Super-Thrive’ by Vitamin Institute
3. EXECUTION
3.01 SURFACE CONDTIONS AND PROTECTION OF PROPERTY
A. Prior to excavation for planting or placing of stakes, locate all electric cables and conduits, storm and sanitary sewer lines and all other utility lines so that proper precautions may be taken not to damage such improvements. In the event of a conflict between lines and plant locations, promptly notify the Landscape Architect. Failure to follow this procedure places upon the Contractor the responsibility to repair damages at his own expense which result from work hereunder.
3.02 INSPECTION
A. Obtain City certification that final grades to +0.10' have been established prior to commencing planting operations. Provide for inclusion of all amendments, settling, etc.
Landscape Contractor shall be responsible for shaping all planting areas as indicated on plans or as directed by the Landscape Architect.
B. Inspect trees, shrubs and liner stock plant material for injury, insect infestation and trees and shrubs for improper pruning.
C. Do not begin planting of trees until deficiencies are corrected or plants replaced.
3.03 PREPARATION
A. Soil Preparation:
1. After rough grading operations have ceased and finished grades have been established to within .10’, the soil shall be conditioned and fertilized in the following manner. Amendments shall be uniformly spread and cultivated thoroughly by means of mechanical tiller into the top 4" of soil. The following organic, soil amendments and fertilizer rates, and quantities are to be used for bid basis only. Specific planting specifications will be made after rough grading operations are complete and soil samples are tested by the Owner per section 1.03F.
Application Rates (Per 1,000 square feet)
Refer to Section 2.01 and / or final agronomic recmmendations.
3.04 PLANTING INSTALLATION
A. General:
1. Actual planting shall be performed during those periods when weather and soil conditions are suitable and in accordance with locally accepted practice, as approved by the Architect.
2. Only as many plants as can be planted and watered on that same day shall be distributed in a planting area.
3. Containers shall be opened and plants shall be removed in such a manner that the ball of earth surrounding the roots is not broken and they shall be planted and watered as herein specified immediately after removal from the containers.
Containers shall not be opened prior to placing the plants in the planting area.
4. Plant locations shown on the Drawings are tentative and subject to minor modification in the field as directed by the Landscape Architect. Make such modifications of location at no additional cost to the City.
5. Do not amend soil underneath rootball of trees or shrubs.
B. Pre-Plant Weed Control:
1. Provide weed abatement program and spray with a non-selective systemic contact herbicide, as recommended and applied by an approved licensed landscape pest control advisor and applicator. Leave sprayed plants intact for at least fifteen (15) days to allow systemic kill.
2. Clear and remove these existing weeds by mowing or grubbing off all plant parts at least 1/4" below the surface of the soil over the entire area to be planted.
3. After irrigation system is operational apply water for five (5) to ten (10) days as needed, to achieve weed germination. Apply contact herbicides and wait as needed before planting. Repeat, if required by Architect.
4. Maintain site weed free until final acceptance by City utilizing mechanical and chemical treatment.
C. Lay-Out of Major Locations:
1. Locations for plants and outlines of areas to be planted shall be marked on the ground by the Contractor before any plant pits are dug. All such locations shall be approved by the Authorized Representative. If underground construction or utility line is encountered in the excavation of planter pits, other locations for planting may be selected by the Authorized Representative. Layout shall be accomplished with flagged grade stakes indicating plant names and specified container size on each stake. It shall be the contractor’s responsibility to confirm with the City Representative and governing agencies the location and depth of all underground utilities, and obstructions.
D. Planting of Trees and Shrubs:
1. Excavation for planting shall include the stripping and stacking of all acceptable topsoil encountered within the areas to be excavated for trenches, tree holes, plant pits and planting beds.
2. Excess soil generated from the planting holes and not used as backfill or in establishing the final grades shall be removed from the site.
3. Protect all areas from excessive compaction when trucking plants or other material to the planting site.
4. Center plant in pit or trench.
5. Face plants with fullest growth into prevailing wind.
6. Set plant plumb and hold rigidly in position until soil has been tamped firmly around ball or roots.
7. The planting pits for 24" box and larger Containers should be excavated twice the diameter and two feet deeper than the rootball with roughed-in sides. No prepared backfill mix shall be placed under rootball. In addition, for trees not planted in tree grates, install a flexible 4" corrugated, perforated drain pipe with soil fabric sock surrounding base of plant pit. Provide a snap tee connection and riser extension to finish grade and install a snap end cap. As determined in field, if percolation rate is less than 2" / hr. additional 6" diameter auger holes at diagonal corners of plant pit shall be made to the depth of 4' below rootball and filled with 3/4" crushed rock and covered with filter fabric.
8. Container plants shall be backfi1led with a thoroughly mixed blend of the following:
amended site soil (refer to Drawings).
9. All plants which settle deeper than the surrounding grade shall be raised to the correct level. After the plant has been placed, additional backfill shall be added to the hole to cover approximately one-half of the height of the root ball. At this stage, water shall be added to the top of the partly filled hole to thoroughly saturate the root ball and adjacent soil.
10. Can Removal:
a. Cut cans on two sides with an acceptable can cutter. b. Do not injure root ball.
c. Do not cut cans with spade or ax.
d. After removing plant, superficially cut edge roots with knife on three sides.
11. Box Removal:
a. Remove bottom of plant boxes before planting.
b. Remove sides of box without damage to root ball after positioning plant and partially backfilling.
12. Plant Tablets:
a. After the water has completely drained, planting tablets shall be placed in the tree and shrub plant pits, no more than 1/3 the way up the rootball and spaced equally around the perimeter approximately 2” from root tips, as indicated below:
Refer to Drawings
b. Planting tablets shall be set with each plant on the top of the root ball while the plants are still in their containers so the required number of tablets to be used can be easily verified by the Architect.
13. Backfill:
a. The remainder of the hole shall then be backfilled and tamped firm. b. After backfilling, an earthen basin shall be constructed around each plant. Each basin shall be of a depth sufficient to hold at least two (2) inches of water. The basins shall be constructed of amended backfill materials. Remove basin in all turf areas after initial watering
c. Make basin berms for trees and shrubs and from 5 gallon and larger containers at least 4" high. Unless otherwise directed, make other mounds at least 2" high. d. After watering, refill settlement within the basins to the required grade, using the specified mix.
e. Watering basins shall be planted with ground cover in normal pattern.
14. Watering:
Immediately after planting, apply water to each tree, vine and shrub in a moderate hose stream in the planting basins, until the material about the roots is completely saturated from the bottom to the top:
a. Provide thorough watering of ground cover by means of the irrigation system within one hour after ground cover planting.
b. Apply water in such quantities, and at such intervals, as are required to keep the ground moist at all times well below the root system of grass and other planting. c. Provide hose watering for plants which cannot be efficiently watered with the irrigation system.
15. Pruning:
a. Pruning shall be limited to the minimum necessary to remove injured twigs and branches. Pruning may not be done prior to delivery of plants. Cuts over 3/4" in diameter shall be painted with tree paint.
16. Staking:
Staking of all trees shall be completed immediately after planting and in accordance with the planting details. All stakes shall be installed plumb and as indicated in details.
E. Pot Planting:
1. Place all plants as specified and as located on plans.
2. Backfill pot to within 1” of rim with a thoroughly mixed custom blend of the following or an approved commercially mixed planter pot soil mix. 1 part by volume washed Silica sand
1 part by volume Organic Amendment (Section 2.01C)
10 lbs 12-8-8 fertilizer per cubic yard of custom mix or approved commercially mixed planter pot soil mix (if fertilizer is not already incorporated into the commercial mix).
F. Mulch Cover:
All groundcover, perennial, and annual beds to be dressed with 3” layer of mulch.
3.05 CLEAN-UP
A. After all planting operations have been completed, remove all trash, excess soil, empty plant containers and rubbish from the property. All scars, ruts or other marks in the ground caused by this work shall be repaired and the ground left in a neat and orderly condition throughout the site. Contractor shall pick up all trash resulting from this work no less frequently than each Friday before leaving the site, once a week, and/or the last working day of each week. All trash shall be removed completely from the site.
B. The Contractor shall leave the site area broom-clean and shall wash down all paved areas within the scope of work area, leaving the premises in a clean condition. All walks shall be left in a clean and safe condition.
3.06 OBSERVATION SCHEDULE
A. The Contractor shall be responsible for notifying the Authorized Representative in advance for the following site visits, according to the time
1. Pre-job conference - 7 days
2. Final grade review - 48 hours
3. Plant material review - 48 hours
4. Plant layout review - 48 hours
5. Soil preparation and planting operations. One tree with each type of specified staking shall be approved prior to planting of trees - 48 hours.
6. Pre-maintenance - 7 days
7. Final walk-through - 7 days
B. When observations are conducted by someone other than the Authorized Representative, the Contractor shall show evidence in writing of when and by whom these inspections were made.
C. No site visits shall commence without all items noted in previous Observation Reports are either completed or remedied, unless such compliance has been waived by the Owner.
Failure to accomplish punch list tasks or prepare adequately for desired inspections shall make the Contractor responsible for reimbursing the Architect at his current billing rates per hour (plus transportation costs). No further inspections shall be scheduled until this fee has been paid and received.
END OF SECTION 48
SECTION 49 LANDSCAPE MAINTENANCE 90 DAY POST INSTALLATION
1. GENERAL
1.01 SUMMARY
A. The requirements of this Specification Section replace the requirements of the "Greenbook" Standard Specifications for Public Works Construction. Delete Section 800 and Section 801.
1.02 GENERAL
A. The requirements of the “Special Provisions” and “Technical Provisions”, shall apply to all work of this Section with the same force and effect as though repeated in full herein.
1.03 DESCRIPTION
A. SCOPE OF WORK
Contractor shall furnish all labor, equipment, materials, tools, services and special skills required to perform the landscape maintenance as set forth in these specifications and in keeping with the surrounding community.
Maintenance of plant material shall include, but not be limited to, trimming, pruning, watering, fertilization, aeration, thatching, weed control, cultivation, pest control and cleanup. It is the intent to provide a plant material maintenance method to keep the site in a state of perpetual growth. Irrigation maintenance shall include operation of system, adjustments and minor repairs.
Maintenance of other park improvements if maintenance period extends into public usage of park facilities, include but not limited to; debris cleanup around picnic areas, repair of decomposed granite surfacing, monitoring of play equipment and exercise equipment installations for loose / missing bolts or accessories. leveling fiber mulch, cleaning park accessories and structures.
PLANT MATERIALS
A. Edging: Groundcover
1. Edging and Trimming:
a. Groundcover adjacent to walks, curbs, paved areas and buildings shall be edged as needed to maintain a neat, clean, well defined edge. b. A four (4) inch to six (6) inch bare dirt clearance shall be maintained around the circumference of all trees, shrubs, signs, etc. in groundcover and adjacent building structures.
c. Trees located in turf areas shall receive two (3) inch min layer of organic mulch with a minimum four (4) to six (6) foot diameter depending upon maturity of tree(s).
2. Fertilization:
a. Fertilize 4 times per year apply Tri-C Premium Humate 8 LBS.per 1000 sq. ft.
4. Watering:
a. Contractor shall schedule water application to produce a deep rooted groundcover.
5. Weed, Pest, and Disease Control:
a. Contractor shall maintain a weed, pest and disease-free ground cover. b. Cultivate bare areas a minimum of once every other week. Care shall be exercised in cultivation not to damage susceptible plant roots. c. Apply pesticides as required to control and prevent disease/insects.
B. Shrubs
1. Pruning:
a. Pruning of shrubs shall be performed to attain maximum desired effect while retaining as much of the natural characteristics or branching as possible. b. Shrubs shall be pruned as required for safety, removal of broken or diseased branches, general containment, or appearance.
c. Natural Shape - The intent is to emphasize the natural form of the shrub.
Initially, "pinch prune" to keep compact and develop structure. Ultimately, remove annually fifty percent (50%) of old stems to the ground to rejuvenate. Avoid shearing which will eliminate flowering wood and destroy character.
d. Natural Hedge - The intent is to develop a loose, informal appearing hedge which requires only minimal attention to keep in shape and size. Initially, pinch prune to keep compact. Allow to fill solid horizontally. This is critical to avoid legginess.
e. Formal Hedge - It is the intent for these shrubs to have straight crisp edges. Initial pinch pruning with shears will encourage the shrubs to fill in. f. Prune at the correct time of year to maximize flowering potential. g. After flowering, remove any spent blossoms on flower stalks.
2. Fertilization:
a. Fertilize 4 times per year apply Tri-C Premium Humate 8 LBS.per 1000 sq. ft.
b. Due to area soil conditions, supplemental feedings of iron may be required to prevent chlorosis.
c. Contractor shall be responsible to apply all materials required to correct mineral deficiencies affecting plant growth.
3. Weed, Pest and Disease Control:
a. Contractor shall maintain weed, pest and disease-free shrub/beds at all times.
b. All Shrub area not underplanted with groundcover will be raked clean and cultivated minimum of every other week.
c. Apply pesticides as required to control and prevent disease/insects.
C. Trees:
1. No tree work shall be done without prior approval and direction from City's representative.
2. Trees shall be pruned as required to remove broken, diseased branches or for genera containment. It shall be Contractor’s prime responsibility related to pruning to conduct a pruning program which must be approved by the City's representative. This program should develop proper tree scaffolding, strength, and appearance consistent with intended use.
3. Tree stakes, ties and guys shall be checked and corrected as needed. Ties will be adjusted to prevent girdling. Remove unneeded stakes, ties and guys.
4. Pruning is limited to that which may be done from the ground (up to fifteen (15) feet).
5. Apply all chemical controls, such as insecticides, as required to control or prevent pests.
6. Fertilize all trees as needed. Trees may require deep root feeding foliar application.
7. Prune trees to allow for the necessary clearances for pedestrians and vehicle circulation, with a minimum canopy clearance of eight (8) feet - twelve (12) feet maximum.
8. Surface roots which become maintenance or appearance problems will be removed as required to prevent damage to adjacent paved areas. This shall be considered extra work.
IRRIGATION SYSTEM
A. Controller
1. Contractor is to adjust his watering schedule equal to the percolation rate each area is capable of receiving based on topography, soil type, plant material, season or climate factors.
2. Contractor shall utilize repeat cycle on controller to eliminate excessive runoff.
3. Hours of scheduled operation will be programmed based upon Solar Sync Logic component and reviewed by Contractor on a monthly basis to minimize disease occurrence of plant material and to reduce possible nuisance from sprinkler operation to pedestrians or vehicles.
4. Locks and keys will be provided by the City's representative.
5. Contractor shall perform preventative maintenance as needed.
B. Operation of System
1. All systems shall be personally observed during operation cycle at least once per month to verify effectiveness of sprinkler operation.
2. Contractor will adjust and clean, as necessary, all sprinkler heads, valves, and pressure reducers to continue operation at maximum efficiency and performance.
3. Sprinkler heads in planter areas shall be kept clear of overgrowth which may obstruct maximum operation.
4. Contractor will be responsible for trimming and making necessary adjustments to riser height as growth rates indicate to prevent "elephant tracks".
5. Contractor shall be responsible for keeping interior of valve boxes clean. A clean gravel base shall be maintained at all times.
6. Dripline systems shall be flushed on a semi-yearly basis C. Repairs
1. Any repairs made by the Contractor will be in accordance with current practices or as directed by City's representative.
a. Current Practices:
(1) Use similar dripline tubing and / or repair and flush lines if damaged during operations.
2. Repairs to irrigation system caused by conditions under which Contractor does not have direct control shall be paid for by the City as extra work. Repairs under this shall be vandalism, normal wear and tear, storm damage (Acts of God).
3. Malfunctions of any nature which are deemed to be the fault of materials or workmanship still covered under original installation guarantee shall be reported immediately to the City's representative.
4. Contractor will maintain an accurate up-to-date record of all irrigation repairs, stating date of repair, specific location, and nature of repair. This log must accompany a monthly itemized invoice.
5. Landscape areas will be returned to original condition following any irrigation repairs or replacements.
CLEAN-UP
Contractor will remove all debris resulting from the maintenance operations at the project and dispose of according to City policies.
END OF TECHNICAL PROVISIONS
APPENDIX A: CITY STANDARDS
APPENDIX B: STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION CURB
CURB FACE
R
X
4' 1220 mm MIN
TRANSITION
4:1 MIN
A ORB
-,
4' (1220 mm
'
1 :14• 'd220 ~m)' I
!{ 11 I
"'~
A ORB
SEE FIGURE 1
R
TYPE 1
TYPE 2
CASE A
PARTS OF THIS STANDARD PLAN SHOW INSTALLATION FOR TYPICAL
RETROFIT CONDITIONS, AND ARE NOT FULLY COMPLIANT WITH CALIFORNIA BUILDING CODE REQUIREMENTS FOR NEW DEVELOPMENT.
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
PROMULGAT£0 8Y THE
PUBLIC WORKS STANDARDS INC.
GRttNBOOK COMMITTEE
1992
REV. 1996, 2000, 2005. 2009.
2013
CURB RAMP
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
STANDARD PLAN
111-5
SHEET 1 OF 10
4' 1220 mm
__._ __ ~_v_ :0
PLANTING ~1
AREA ~
CURB
CURB FACE
WHERE PLANTING AREA IS
ADJACENT TO THE CURB RAMP,
USE CASE A, TYPE 6
>-
~
" ~ PLANTING
o._ AREA
CURB
CURB FACE
WHERE PLANTING AREA IS
ADJACENT TO THE CURB RAMP,
USE CASE A, TYPE 6
N
BCR
b< ,,c;,j::', <o '
'\,<:> '~ ~ "',;;."'
~ '\, ,,, CJ"'-~
s_._ \>-0
0 "'
'1 Cf2% MAX
- GRADE BREAK
BCR
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
CURB RAMP
TYPE 3
TYPE 4
CASE A
STANDARD PLAN
111-5
SHEET OF 10
R
CURB
CURB FACE
PCC WALK
4 1220 mm MIN R
NOTE 2
~RB
4' 1220 mm
1 •
2 • I
NOTE
I· ~~ • I ~1~.I 7ioo mm)
A ORB
R
DE BREAK
~1cs
"'~
PLANTING AREA
SEE FIGURE 1 TYPE 5
I ,PARKWAY • 1
R ...... 1-1-. 2%
MAX
i:5
~
c:,
z
;::
~ ..J
a.
PLANTING AREA TYPE 6
CUR
CURB FACE
IF PLANTING AREA IS NOT
ADJACENT TO SIDE FLARE, USE
"X" PER TABLE 2 FOR THAT FLARE
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
CURB RAMP
CASE A
STANDARD PLAN
111-5
SHEET 3 OF 10
" <t ..J NOTE 2
~~ Rl "'u <U
C>-Cl..
~1~
N~
NOTE 2
CURB
CURB FACE
C
Z=X
-~ 1 · Z=X 'I
4' ::...Jx
(1220 mm 1~ ~
C "'
~-/-
--\-
" ~<i" C,
,<i-~
TYPE 1
TYPE 2
CASE B
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5
SHEET 4 0 10
SKEW ANGLE a=45'
OFFSET b=O
UNLESS OTHERWISE
NOTED ON PLANS
CURB
CURB FACE
y
SKEW ANGLE, a
SEE DETAIL
A, 8, C, OR D
A
PLANTING
AREA
CURB
CURB FACE
SEE DETAIL A, B, C OR D
A
NOTE 2
CURB
CURB FACE
y
i,
) NOTE 2
NOTE 8
TYPE 1
5%MAX
X=4' (1220 mm)
IF ADJACENT TO
PLANTING AREA,
OTHEWISE SEE TABLE 1
'?
E
0 - N
A g
%MAX ;,.
TYPE 2
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
CURB RAMP
CASE C
CASE D
STANDARD PLAN
111-5
SHEET 5 OF 10
s
4' (1220 mm)--"
CURB
s
4' (1220 mm
PLANTING
AREA
CURB FACE
CURB
X=4' 1220 mm
WHEN ADJACENT
TO PLANTING AREA
s
NOTE 2
CURB FACE
4' X
(1220 mm)
LO ~1~ :,;
MARKED
CROSSWALK
X
...,..J
LO
~,~ :,;
s
MARKED
CROSSWALK
2%
Miix
X
NOTE 2
MARKED
CROSSWALK
TYPE 1
---x-1-jju
X
GRADE BREAK
MARKED
CROSSWALK
NOTE 8 TYPE 2
CASE E
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5
SHEET OF 10
SEE NOTE 6~ PA KWAY
4' 1220 mm
EXISTING I I ROUNDE TOP OF
ROADWAY 5% ~tL.tC:=:=:=;~~::j=s~~JE~D[G]E~;i_~~===~R~AM£P~"J5:BJ ------!__ MAX -----------.;,.. M , y_ - 2% MAX --=B.33% ~ A2-0 CURB AND GUlliR
SECTION A-A
PARKWAY
Y 4' 1220 mm
ROUNDED TOP OF
EDGE RAMP.,,----.__
SECTION B-B
USE FIGURE 1 TO DETERMINE
WHICH OF SECTIONS A-A, 8-8
OR C-C IS APPROPRIATE.
DEPRESS BACK OF WALK
SEE DETAIL A, B, C OR 0,
SHEET 10.
SEE NOTE 6~ PARKWA
y EXISTING I I 4' (1220 mm) MIN
ROADWAY S%
~ DEPRESS BACK OF WALK
SEE DETAIL A, B, C OR D,
SHEET 10. ___ _,_-l------2=%-M_A_X_-4--~
'---"'-' A2-0 CURB AND GUTTER
SECTION C-C
z ~ z
1220 mm
/J DEPRESS BACK OF WALK
~ I~ 1 < ~¾..q-t ~/" '---PCC SIDEWALK
SECTION R-R
OR LESS
z z
PCC SIDEWALK
SECTION S-S
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5
SHEET 7 OF 10
PARKWAY WIDTH, FT (m)
4' 5' 6' 7' 8' 9' 10' 11' 12' 13' 14' 15' 16' 17' 18' 19' 20' (1.2) MIN(l.5) (1.8) (2.1) (2.4) (2.7) (3.0) (3.3) (3.6) (3.9) (4.2) (4.5) (4.8) (5.1) (5.4) (5.7) (6.0) ,.-._ 1" (25) "-
E 2" (50) I'-..
E '--- ~
(f)
3" (75)
-......._ w ~ J
I 4" (100) _L " /
0 0 ' J SECTION A-A r'
z 5" (125)- e- I - / 1 LANDING = 4' (1220 mm) 1
0 '--..
w 6" (150)-e-z 0 " <t 0
L,_ 7" (175)- ~ f- "- 0
m 8" (200)- ~w ~
0:::
=i ~ J I'-...
0 g" (225)
:;i 10" (250)
I'---.... ,,,..- SECTION B-B 1-.........
CALCULATE Z DIMENSION "-, 2 I PER FORMULA BELOW
0::: 11" (275) " l " 0 I'-...
z 12" (300)
OR MORE FIGURE 1 - SECTION USAGE
NORMAL WHERE FIGURE 1 SHOWS USE OF SECTION 8-8, FIGURE Z CURB FACE, SECTION Y-Y DIMENSION AS FOLLOWS:
INCHES (mm) X, FT (mm) Y, FT (mm) W = PARKWAY WIDTH
2" (5D) 4.00' (1220) MIN 2.63' (790) L = LANDING WIDTH, 4' (1220 mm) TYP 3" (75) 4.00' (1220) MIN 3.95' (1185)
Z = [(Y+L)-W] x 0.760
4" (100) 4.00' (1220) MIN 5.26' (1580) IF (Y+L) < W, THEN Z = 0 5" (125) 4.17' (1275) 6.58' (1975)
6" (150) 5.00' (1525) 7.90' (2370)
7" (175) 5.83' (1775) 9.21' (2765)
8" (200) 6.67' (2035) 10.53' (3160)
9" (225) 7.50' (2285) 11.84' (3555)
10" (250) 8.33' (2540) 13.16' (3950)
11" (275) 9.17' (2795) 14.47' (4340)
12" (300) 10.00' (3050) 15.79' (4735)
SEE SHEET 9 FDR STREET SLOPE
ADJUSTMENT FACTORS, ALL STREETS
TABLE 1 - X AND Y VALUES
TABLE 1 REFERENCE FORMULAS:
X = CF / 8.333%
Y = CF / (8.333% - 2% WALK CROSS SLOPE)
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5
SHEET 8 OF 10
4' (1220 mm)
CURB/ / GUTTER TX.DOWN
CURB FACE SLOPE, S J. z ·I· 4'
X.UP :r
(1220 mm)
TYPICAL CURB RAMP
,.XDO~I ~
BACK OF WALK?-~-- ' ~-
~ ..,5__>[ }Z,GUffiR
SECTION T- T FLOW LINE
SLOPED STREET
FOR SLOPED STREETS, MULTIPLY THE DIMENSIONS PARALLEL
TO THE STREET. X AND Z, UPSTREAM AND DOWNSTREAM OF
THE RAMP, BY THE FACTORS IN THE FOLLOWING TABLE.
FOR EXAMPLE, X.DOWN = X x K.DOWN
s K.DOWN K.UP
0% 1.000 1.000
0.2% 0.977 1.025
0.5% 0.943 1.064
1% 0.893 1.136
2% 0.806 1.316
3% 0.735 1.563
4% 0.676 1.923
5% 0.625 2.500
TABLE 2 - SLOPE ADJUSTMENTS
TABLE 2 REFERENCE FORMULAS:
K.DOWN = 8.333% / (8.333% + S)
K.UP = 8.333% / (8.333% - S)
STREET SLOPE ADJUSTMENTS
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5
SHEET 9 OF 10
12" (305 mm @ @ @
E
0.90" 'i--, E
(23 mm)!@' I d"'
@ @ @
@ @ @ SINGLE
@ @ @ PAITTRN . 0 "TRUNCATED DOME"
12.35"
(60 mm)
GROOVING DETAIL DETECTABLE WARNING DETAIL
CONSTRUCT FENCE OR HANDRAIL
PER CONTRACT PLANS --..J
6" (150 mm)
H PAVED SURFACE
,,-::PAVED SURFACE
\ l~l <--J...===~~ D ET Al L A
GRADED
RETAINING CURB - I I I
SLOPE M;~ ~-N!'AVED SURFACE RETAINING CURB---._
DETAIL B
..-,I,-) -=--=--=--=--=---=--.;]7~~~
DETAIL C DETAIL D
GENERAL NOTES:
1. CONCRETE SHALL BE CLASS 520-C-2500 (310-C-17) CONFORMING TO SSPWC 201-1.1.2 AND SHALL BE 4" (100 mm) THICK.
2. THE RAMP SHALL HAVE A 12" (305 mm) WIDE BORDER WITH 1/4" (6 mm) GROOVES APPROXIMATELY 3/4" (19 mm) OC. SEE GROOVING DETAIL.
3. THE RAMP SURFACE SHALL HAVE A TRANSVERSE BROOMED SURFACE TEXTURE CONFORMING TO SSPWC 303-1. 9.
4. USE DETAIL "A" OR "B". IF EXISTING SURFACE BEHIND LANDING IS PAVED.
5. USE DETAIL "C" OR "D" IF EXISTING SURFACE BEHIND LANDING IS UNPAVED.
6. R = 3' (900 mm) UNLESS OTHERWISE SHOWN ON PLAN. SEE SHEET 7.
7. ANGLE = 6/2 UNLESS OTHERWISE SHOWN ON PLAN.
8. CONSTRUCT DETECTABLE WARNING SURFACE PER DETAIL THIS SHEET. MATERIALS SHALL BE PER CONTRACT DOCUMENTS.
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5
OF10
I {
: -< (:D'
z c· I ....... ~ c;'<-~' I I CJ I w ,I'~ :;,:I :::; I I 3W _ I I X B' 4 I I
I Jj_ BASE LINE l I I ----1..?: y - _4 -------- ------------ 1-- A L/3 ,B L/3 ,C L/3 D
I L I
X2 Y=2.25W( L)
L=LENGTH OF TAPER
W=MAXIMUM OFFSET DISTANCE
X=DISTANCE ALONG BASE LINE
Y=OFFSET FROM BASE LINE
L, ft (m) DISTANCE X, L '12 INCREMENTS, ft (m)
60' 5' 10' 15' 20' 25' 30' 35· 40' 45· 50 55· 60'
(18.00) (1.50) (3.00) ( 4.50) (6.00) (7.50) (9.00) (10.50) (12.00) (13.50) (15.00) (16.50) (18.00) 72 6' 12 18' 24' 30' 36' 42' 48' 54' 60 66' 72'
(21.60) (1.80) (3.60) (5.40) (7.20) (9.00) (10.80) (12.60) (14.40) (16.20) (18.00) (19.80) (21.60) 90' 7.5' 15' 22.5' 30' 37.5' 45' 52.5' 60' 67.5' 75' 82.5' 90' (27.00) (2.25) (4.50) (6. 75) (9.00) (11.25) (13.50) (15. 75) (18.00) (20.25) (22.50) (24. 75) (27.00) 120 10' 20' 30' 40' 50' 60' 70' 80' 90' 100· 11 o· 120' (36.00) (3.00) (6.00) (9.00) (12.00) (15.00) (18.00) (21.00) (24.00) (27.00) (30.00) (33.00) (36.00) 150 12.5' 25' 37.5 50 62.5 75· 87,5 100· 112.5' 125' 137.5 150 (45.00) (3.75) (7.50) (11.25) (15.00) (18.75) (22.50) (26.25) (30.00) (33.75) (37.50) (41.25) ( 45.00) W, ft mm OFFSET Y, ft (mm)
10 0.16' 0.62' 1.41' 2.50' 3.75' 5.00' 6.25' 7.50' 8.59' 9.38' 9.84' 10.00' (3000) (47) (188) (422) (750) (1125) (1500) (1875) (2250) (2578) (2812) (2953) (3000' 11' 0.17' 0.69' 1.55' 2.75' 4.13' 5.50' 6.88' 8.25' 9.45' 10.31' 10.83' 11.00' (3300) (51) (206) (464) (825) (1238) (1650) (2063) (2475) (2836) (3094) (3249) (3300) 12· 0.19' 0.75' 1.69' 3.00' 4.50' 6.00' 7.50' 9.00' 10.31' 11.25' 11.81' 12.00' (3600) (56) (225) (506) (900) (1350) (1800) (2250) (2700) (3094) (3375) (3544) (3600) 19· 0.30' 1.19' 2.67' 4.75' 7.13' 9.50' 11.88' 14.25' 16.33' 17.81' 18.70' 19.00' (5700) (89) (356) (802) (1425) (2138) (2850) (3562) (4275) (4898) (5344) (5611) (5700) 20 0.31' 1.25' 2.81' 5.00' 7.50' 10.00' 12.50' 15.00' 17.19 18.75 19.69' 20.00' (6000) (94) (375) (844) (1500) (2250) (3000) (3750) (4500) (5156) (5625) (5906) (6000) 21 0.33 1.31' 2.95' 5.25 7.88' 10.50 13.13 15. 75 18.05 19.69 20.67 21.00 (6300) (98) (394) (886) (1575) (2363) (3150) (3937) (4725) (5414) (5906) (6202) (6300) 22 0.34 1.38' 3.09' 5.50' 8.25' 11.00' 13.75' 16.50' 18.91 20.62 21.66 22.00' (6600) (103) ( 412) (928) (1650) (2475) (3300) (4125) (4950) (5672) (6188) (6497) (6600) NOTE:
TO DETERMINE OFFSET DISTANCE FOR ANY LENGTH OF TAPER USE THE FORMULA Y=2.25W(f f FOR THE PORTIONS AB' AND C'D' WHICH ARE PARABOLIC CURVES. THE PORTION B'C' IS A TANGENT. WHEN THE BASE LINE IS CURVED, THE OFFSETS ARE APPLIED TO THE CURVED BASE LINE, AND B'C' IS NO LONGER A TANGENT.
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
PROMULGAlm BY THE STANDARD PLAN
PUBLIC WORKS STANDARDS INC. MEDIAN TAPER 140-3 GREENBOOK COMMITTEE 1984
REV. 1992, 1995. 2009
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 1 APPENDIX C: CALTRANS STANDARDS
DETAIL 3 DELETED
(2 LANE HIGHWAYS)
RETROREFLECTIVE FACE
CENTERLINES
TYPE C AND TYPE D TYPE G AND TYPE H
(MULTILANE HIGHWAYS)
LANE LINES
7'-0" 17'-0" 7'-0" 17'-0" 7'-0"
DETAIL 3DETAIL 4
DETAIL 5
DETAIL 4 DELETED
DETAIL 6
7'-0" 17'-0" 7'-0" 17'-0" 7'-0"
12'-0" 36'-0" 12'-0"12'-0" 36'-0" 12'-0"
DETAIL 1
DETAIL 2
DETAIL 7 DETAIL 7 DELETED DETAIL 13DETAIL 14DETAIL 14A
DETAIL 13 DELETED DETAIL 14 DELETED
DETAIL 14A DELETED
DETAIL 12A
DETAIL 12
DETAIL 11DETAIL 10 DETAIL 10 DELETED
DETAIL 9ADETAIL 8
DETAIL 9
NO PASSING ZONES - ONE DIRECTION
NO PASSING ZONES - TWO DIRECTION
DETAIL 15 7'-0" 17'-0" 7'-0" 17'-0" 7'-0"
7'-0"
LOLLOL
3"
3"
DETAIL 16
LOL
DETAIL 18DETAIL 17 DETAIL 17 DELETED
12'-0" 36'-0" 12'-0"
3"
LOL
DETAIL 19
3"
DETAIL 20 DETAIL 20 DELETED
LOL
DETAIL 21
LOL
DETAIL 22
24'-0" 24'-0"
2"
3"
2"
DETAIL 23 DETAIL 23 DELETED
3"
MARKER DETAILS
8'-6" 7'-0" 17'-0" 7'-0" 8'-6"
48'-0"
18'-0" 12'-0" 18'-0"
48'-0"48'-0"
8'-6" 7'-0" 17'-0" 7'-0" 8'-6"8'-6" 7'-0" 17'-0" 7'-0" 8'-6" 48'-0"48'-0"
18'-0" 12'-0" 18'-0"
48'-0"
18'-0" 12'-0" 18'-0"
48'-0"
8'-6" 7'-0" 8'-6"
24'-0" 24'-0" 2
"
18'-0" 12'-0" 18'-0" 18'-0" 12'-0"
24'-0" 24'-0" 24'-0" 2
"
3‡"-4?" 3‡"-4?"
1‡"-4?"
…"-¾"
1‡"-4?"
…"-¾"
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
TYPICAL DETAILS
PAVEMENT MARKERS AND TRAFFIC LINES
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
6" YELLOW LINE6" WHITE LINETYPE H ONE-WAY YELLOW RETROREFLECTIVE MARKERTYPE G ONE-WAY CLEAR RETROREFLECTIVE MARKERTYPE D TWO-WAY YELLOW RETROREFLECTIVE MARKERTYPE C RED-CLEAR RETROREFLECTIVE MARKER LEGEND:
3-31-24
C82065
Yue Wang
12 A20A
2023STA ND ARDPLA NA 20A
2-7-23
See Notes A and B
FINISHED ROADWAY SURFACE
SECTION A-A
PLAN
INTERSECTION LINE
CHANNELIZING LINE
MARKER DETAILS
BIKE LANE LINE
BIKE LANE
TYPE 1
TRAFFIC STRIPE
DETAIL FOR RECESSED
See Notes 1 and 2
RETROREFLECTIVE FACE
FOR RECESSED INSTALLATION
RETROREFLECTIVE PAVEMENT MARKER
A A
2'-0" Min 1'-0" Min
5?"±?"Va
r
2'-0" Min 1'-0" Min 2'-0" Min
RECESS DETAIL FOR RETROREFLECTIVE PAVEMENT MARKER
PLAN
B B
5?"±?"
MARKER AT CENTER OF RECESSRETROREFLECTIVE PAVEMENT
Var
THROUGH TRAFFIC
DETAIL 38 8" WHITE LINEDETAIL 38A 8" WHITE LINEDETAIL 38B 8" WHITE LINE
DETAIL 38C DETAIL 38C DELETED DETAIL 38D
EXIT RAMPS ONLY
DETAIL 39
6" WHITE LINE
DETAIL 39A
6" WHITE LINE
DETAIL 40 6'-0" 6" WHITE LINE
LANE LINE EXTENSIONS THROUGH INTERSECTIONS
DETAIL 40A DETAIL 40A DELETED DETAIL 41DETAIL 41A DETAIL 41A DELETED 1'-0"
1'-0" 6'-0"
CENTERLINE EXTENSIONS THROUGH INTERSECTIONS
6" YELLOW LINE
RETROREFLECTIVE FACE
TYPE C TYPE G
RECESSED NOTES:
B.A.
material thickness.recess depth and recess stripingSee Standard Specifications forfor pavement marking patterns.See typical traffic line details 6" TO 8"
200'-0" INTERSECTION
8'-0" 4'-0"
24'-0" 24'-0"24'-0" 24'-0"24'-0" 24'-0"
2"
2"
2"
2"
STRIPING MATERIAL
See Note 4
AND TYPE D
TYPE C, TYPE RY,
AND TYPE H
TYPE G, TYPE R,
8" WHITE LINE
2"-2½"
2"-2½"
SEE NOTE3
0"-?",
SEE NOTE3
0 "-?",
SECTION B-B
TYPE 2
AT DOWNSTREAM END OF RECESSRETROREFLECTIVE PAVEMENT MARKER
AT DOWNSTREAM END OF RECESSRETROREFLECTIVE PAVEMENT MARKER See Note 5
MARKER AT CENTER OF RECESSRETROREFLECTIVE PAVEMENT
RECESSED MARKER NOTES:
5.4.3.2.1. of the recess.and place the marker at the upstream endface. Reverse the orientation of the recessType R markers with one-way retroreflectiveFor exit ramps, use Type 1 recess fortwo-way retroreflective face.Type 2 recess for pavement markers withwith one-way retroreflective face. UseUse Type 1 recess for pavement markerspavement surface.in recesses shall be 0" to ?" below theThe top of pavement markers installedused for non-recessed installations.for recessed installations are not to beThe retroreflective pavement markers shownmarkers.patterns to be used with recessed pavementSee typical traffic line details for marker 6"
3?"-4?" 3?"-4?"
?"-¾"
?"-¾"1?"-4?"
1?"-4?"
?"-?"
4?"-4?" 4?"-4?"
?"-?"
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
TYPICAL DETAILS
PAVEMENT MARKERS AND TRAFFIC LINES
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
6" YELLOW LINE NO SCALETYPE G ONE-WAY CLEAR RETROREFLECTIVE MARKERTYPE C RED-CLEAR RETROREFLECTIVE MARKER LEGEND:
15 A20D
2023STA ND ARDPLA NA 20D
2-7-23
3-31-24
C82065
Yue Wang
RETROREFLECTIVE FACE
MARKER DETAILS
TYPE C
PREFERENTIAL LANE LINES
* See pavement delineation plan for dimension.
DETAIL 42
DETAIL 43
DETAIL 43A
4"
2"
8"
2"
*
12'-0" 18'-0" 18'-0" 12'-0"
24'-0" 24'-0"24'-0" 24'-0"24'-0" 24'-0"
2"
2"
2"2"
1"TO2"
1"TO2"3
"
2"2"
4"
4"
3‡"-4?"
…"-¾" 1‡ "-4? "
DETAIL 43 DELETED
DETAIL 43A DELETED
3"
BUFFER SPACE
DETAIL 44A
LOLLOL
DETAIL 44BDETAIL 45
LOL
SPACE
BUFFER
2'-0"
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
TYPICAL DETAILS
PAVEMENT MARKERS AND TRAFFIC LINES
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
8" WHITE LINETYPE C RED-CLEAR RETROREFLECTIVE MARKER
LEGEND:
17 A20F
2023STA ND ARDPLA NA 20F
2-7-23
3-31-24
C82065
Yue Wang
3'-6" 3'-6"
6'-0"
8'-0"
TYPE ÎÏ (L) ARROW
3'-6"
EDGE
OF
PAVEMENT
TYPE ÏÎ ARROW
DIRECTION
OF
VIEW
5'-6"
8'-6"
9'-0"
7'-3"
9 '-
0 "
TYPE Ï ARROW
10'-0"
18'-0"
15'-0"
13'-0"
17'-6"
24'-0"
24'-0"
18'-0"
TYPE ÏÎÎ (L) ARROW
2'-0"
BIKE LANE ARROW
5'-0"
1'-9"
2'-0"
6"
1'-0" GRID
1'-0" GRID
1'-0" GRID
1'-0" GRID
1'-0" GRID
1'-0" GRID
1'-0" GRID
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
20^
6" GRID
TYPE Î 18'-0" ARROW
TYPE ÏÎÎÎ ARROW
TYPE Î 24'-0" ARROW
TYPE Î 10'-0" ARROW
For left lane, use mirror image.
Right lane drop arrow.
may be accepted by the Engineer.Minor variations in dimensions NOTE:
For Type ÎÏ (R) arrow, use mirror image.
For Type ÏÎÎ (R) arrow, use mirror image.
A=25 ftÄ
A=31 ftÄ
A=15 ftÄ
A=36 ftÄ
A=27 ftÄ
A=14 ftÄ
A=42 ftÄ
A=33 ftÄ
A=3.5 ftÄ
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
ARROWS
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
19 A24A
2023STA ND ARDPLA NA 24A
2-7-23
3-31-24
C82065
Yue Wang
TYPE ÎÎ (B) ARROW
6'-0" 7'-0"
TYPE ÎÎ (L) ARROW
11'-0"
24'-0"
24'-0"
24'-0"
24'-0"
10'-0"
TYPE ÎÎÎ (B) ARROW
1'-0" GRID 1'-0" 1'-0" 1'-0" 1'-0" GRID 1'-0" GRID 1'-0" 1'-0" GRID TYPE ÎÎÎ (L) ARROW
Minor variations in dimensions
NOTE:
may be accepted by the Engineer.
For Type ÎÎÎ (R) use mirror image. For Type ÎÎ (R) use mirror image. 8'-0"
6'-0"
*
14'-0" 20'-0" 14'-0" 1'-4" 1'-4"
1'-0" GRID
OF LANE
OF LANE
2'-0" x WIDTH
2'-0" x WIDTH
RAILROAD CROSSING SYMBOL
*
width transverse lines.
A=42 ftÄ A=73 ftÄ A=45 ftÄ A=59 ftÄ
A=70 ftÄ
70 ftÄ does not include the 2'-0" x variable
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
ARROWS AND SYMBOLS
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
20 A24B
2023STA ND ARDPLA NA 24B
2-7-23
3-31-24
C82065
Yue Wang
4'-8" 4'-8"
NUMERALS
8'-0"
4'-11"
8"
8'-0"
8"
8'-0"
8"
4" 4" 4"
A=17.5 ftÄ A=16.5 ftÄ A=19.5 ftÄ
DIAMOND SYMBOL
12'-0"
6"
3'-3"
1'-0" GRID
A=11 ftÄ
10"
BICYCLE LOOP
DETECTOR SYMBOL
3"
3"
2"
1" GRID
1'-8"
1'-8"
1'-8"
5'-6"
A=2 ftÄ
Minor variations in dimensions may be acceptedby the Engineer.
NOTE:
6'-6"
4" GRID
3'-4"
WITH PERSON
BIKE LANE SYMBOL
A=7 ftÄ
2'-8½"
4'-5"
3'-9"
4'-5"
3'-9"
3'-0"
WHITE BLUE
6" GRID
A (WHITE) =9 ftÄ
A (BLUE) =14 ftÄ
ACCESSIBILITY (ISA) MARKING
INTERNATIONAL SYMBOL OF
SHARED ROADWAY BICYCLE MARKING
3'-3"
5'-9"
9'-3"
3'-6"
2'-0"
6"
6"
6"
1"
A=11.5 ftÄ
~
6" GRID
4" GRID
3'-4"
6'-0"
WITHOUT PERSON
BIKE LANE SYMBOL
A=7 ftÄ
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
SYMBOLS AND NUMERALS
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
21 A24C
2023STA ND ARDPLA NA 24C
2-7-23
3-31-24
C82065
Yue Wang
4" 4"
8"
8"
8"
4"
8"
4"
8"
4"
8"
4"
8"
4"
8"
4"
8"
4"
8"
4"
A=6 ftÄ
4"
2"
XING
AHEAD
WAIT
LANE
RIGHT
YIELD
SCHOOL
SIGNAL
TURN
HERE
BIKE
SLOW
STOPLEFT
ITEM ITEM ITEM
WORD MARKINGS
ITEM
PED
COMPACT
RUNAWAY
VEHICLES
21 31
19 6
26 5
23 22
19 24
35 32
24 26
18 10
43 42
A=5 ftÄ
2"
4"
4"
2"
A=10 ftÄ
8"
4"
A=22 ftÄ A=18 ftÄ
8"
4"
8"
4"
A=26 ftÄ
8"
4"
A=19 ftÄ
8"
4"
A=32 ftÄ
A=35 ftÄ
A=43 ftÄ
A=31 ftÄ A=24 ftÄ A=26 ftÄ A=21 ftÄ
A=42 ftÄ A=24 ftÄ A=23 ftÄ A=19 ftÄ
ftÄ ftÄ ftÄ ftÄ
NOTES:
connecting segments not to exceed 2" in width.4. Portions of a letter, number or symbol may be separated by3. Minor variations in dimensions may be accepted by the Engineer. where there is limited space because of local conditions. the height of the characters. The space may be reduced appropriately the characters for low speed roads, but not more than ten times2. The space between words must be at least four times the height of i.e., the first word must be nearest the driver.1. If a message consists of more than one word, it must read "UP",
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
WORDS
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
22 A24D
2023STA ND ARDPLA NA 24D
2-7-23
3-31-24
C82065
Yue Wang
A=2 ftÄ
8"
4"
8"
4"
8"
4"
8"
4"
8"
4"
4"
8"
8"
4" 4"
8"
12"
12"
2"
1½"
See Notes 5 and 6
8"
4"
8"
4"
8"
4"
A=14 ftÄ A=24 ftÄ A=27 ftÄ A=21 ftÄ A=22 ftÄ
A=24 ftÄ A=20 ftÄ A=16 ftÄ
A=23 ftÄ A=18 ftÄ
A=30 ftÄ
ONLY
LANE
ITEM ITEM
CLEAR
KEEP BUS
BIKE
NO
FWY
24 14
21 20
27 22
24 16
SQFT SQFT
HOV 18
TRAIL 23
WORD MARKINGS
EXPRS 30
NOTES:
is visible to traffic enforcement officials.contrasting background and located so that itwhite letters no less than 1'-0" high on aThe words "NO PARKING", shall be painted inand A90B.locations of markings, see Standard Plans A90Abe used for parking facilities. For typicalThe words "NO PARKING" pavement marking is toexceed 2" in width.separated by connecting segments not toPortions of a letter, number, or symbol may beby the Engineer.Minor variations in dimensions may be acceptedspace because of local conditions.reduced appropriately where there is limitedheight of the characters. The space may bespeed roads, but not more than ten times thetimes the height of the characters for lowThe space between words must be at least fournearest the driver.it must read "UP",i.e., the first word must beIf a message consists of more than one word,
6.5.4.3.2.1. THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
WORDS
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
23 A24E
2023STA ND ARDPLA NA 24E
2-7-23
3-31-24
C82065
Yue Wang
NOTES:
BASIC
1'-0" TO 2'-0"
6'-0"Min
3.2.1. 1'-0" TO 5'-0"
CONTINENTAL
1'-0" TO 2'-0"
6'-0"Min
See Note 1
DIAGONAL
45^ 6
'-0"Min
1'-0" TO 2'-0"
1'-0" TO 2'-0"
1'-0" TO 2'-0"
TRIPLE FOUR
Min
2'-0"
2'-0"
4'-0"
4'-0"
4'-0"
LADDER
6'-0"Min
1'-0" TO 2'-0"
1'-0" TO 2'-0" 1'-0" TO 2'-0"
1'-0" TO 5'-0", SEE NOTE 2
1'-0" TO 5'-0", SEE NOTE 2
HIGHER VISIBILITY CROSSWALKS
schools must be yellow.All crosswalk markings must be white except those nearSpacings not to exceed 2.5 x width of longitudinal line.of each lane.Spaces between markings must be placed in wheel tracks
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
CROSSWALKS
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
See Note 1
24 A24F
2023STA ND ARDPLA NA 24F
2-7-23
3-31-24
C82065
Yue Wang
YIELD LINE AT EXIT RAMP
LIMIT LINE (STOP LINE) AT EXIT RAMP
LIMIT LINE (STOP LINE)
YIELD LINE
TYPE Ï ARROW AT EXIT RAMP
TYPE R
TRIANGLESOF ISOSCELESWHITE SERIES
1'-0"
17'-6"
9 '-
0 "
LIMIT LINE OR CROSSWALK1'-0" TO 2'-0"
WHITE LINE1'-0" TO 2'-0"
1. RETROREFLECTIVE FACE ON BACKSIDE
NOTE:
A=33 ftÄ
LEGEND:
2"
2"
2"2"
24'-0"
12'-0"
2'-0"
TRIANGLESOF ISOSCELESWHITE SERIES
1'-0"
up the ramp with the red reflective side facing the intersection.markers in front of the first line for wrong way vehicle that travels If there is crosswalk at the end of the exit ramp, place Type R
RETROREFLECTIVE MARKERTYPE R ONE-WAY RED
MARKER DETAILS
REFLECTIVERED
BLANK
REFLECTIVERED
BLANK
45 45 ° °
AT THIS LOCATIONUSE ONE MARKERWHEN RECESSED,
(Markers are not recessed)
(Markers are not recessed)
YIELD LINE AT EXIT RAMP
(Markers are recessed)
LIMIT LINE (STOP LINE) AT EXIT RAMP
(Markers are recessed)
Typ
2'-0"
REFLECTIVERED
BLANK
Typ
4'-0"
1'-0" WHITE LINE
BLANK
REFLECTIVERED
Typ 3'-0
"
T2yp"
Typ
1'-0"
Typ
1'-0"
Typ
2'-0"
TRIANGLESOF ISOSCELESWHITE SERIES
Typ
1'-0"
Typ 3'-0
"
Typ 3'-0
"
T2yp"
Typ
1'-0"
Typ
2'-0"
Typ 3'-0
"
Typ 3'-0
"
Typ
1'-0"
Typ
4'-0"
45° 45°
?"-¾"
3?"-4?"
1?"-4?"
Typ
4'-0"O/C
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
May 1, 2023
AND WRONG WAY DETAILS
YIELD LINES, LIMIT LINES
PAVEMENT MARKINGS
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NO SCALE
25 A24G
2023STA ND ARDPLA NA 24G
2-7-23
3-31-24
C82065
Yue Wang
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
RAISED TRUNCATED DOME
CURB RAMP DETAILS
RAISED TRUNCATED DOME PATTERN (IN-LINE)
DETECTABLE WARNING SURFACE
Min
4'-2"
EDGE OF SIDEWALKIF NECESSARY ATRETAINING CURB
CASE B
SIDEWALKEDGE OFFRONT
B
B
CROSSWALK IF PROVIDED
CROSSWALK IF PROVIDED
A
A
Max
Ty
1 p
:1
Typ
1:1
Min
4'-2"
CASE D
SIDEWALKEDGE OFFRONT
AREAPLANTING SIDEWALK
EDGE OFFRONT
Min
4'-2"
4'-2" Min
CASE E
A
A
Typ
6"
A
Max
CASE A
4'-2" Min
T
6 yp
"
Min
5'-0"
A
SIDEWALK
LANDING
LANDING
FLARE
RAMP
FLARE
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
DETAIL A
Max
1.5%
7.5%
Max
7.5%
Max
7.5%
Max
7.5%
7.5%
Max
7.5%
1.5% Max
Max
1.5%
Max
1.5%
1.5% Max
Max
1.5%
Max
1.5%
Max
1.5%
1.5% Max T
SECTION C-C
1.5% Max 7.5% Max T
4'-2" Min
SECTION B-B
Depress entire sidewalk as required
ROUNDED
IF NECESSARY
RETAINING CURB
1.5% Max T
7.5% Max
4'-2" Min
SECTION A-A
ROUNDED
TOP OF RAMP
C
C
Max Max
OF SIDEWALKFRONT EDGE
CASE C
OF SIDEWALKNECESSARY AT EDGERETAINING CURB IF
Min
5'-0"
SIDEWALK
7.5% 7.5%
1.5% Max
1.5% Max
Max
1.5%
Max
1.5%
CORNER INSTALLATION
TYPICAL TWO-RAMP
FLARE FLARE
CROSSWALK IF PROVIDED
CROSSWALK IF PROVIDED
Min
4'-2"
RAMP
LANDING
SIDEWALK
PROVIDE 2'-0" Min OF CURBWHERE A FLARED SIDE OCCURS
Min OF CURBPROVIDE 2'-0"SIDE OCCURSWHERE A FLARED
CORNER INSTALLATION
TYPICAL ONE-RAMP
DETAIL B
FLARE
RAMP
FLARE
Gutter not shown
AT CURB9.0% Max
AT CURB9.0% Max
AT CURB9.0% Max
AT CURB9.0% Max
AT CURB9.0% Max
AT CURB9.0% Max
AT CURB9.0% Max
T
6 yp
"
SIDEWALKEDGE OFFRONT
SEE NOTE 8
SEE NOTE 8
TOP OF RAMP
AT CURB9.0% Max
1.5% Max
Min
4'-2"
1.5% Max
FLOWLINEGUTTER
SEE NOTE 8
FLOWLINEGUTTER
IF NECESSARYRETAINING CURB
FLOWLINEGUTTER
See Note 1 See Notes 1 and 3
CENTER TO CENTER SPACING2.3" Min AND 2.4" Max
0.2"
12-31-23
SIDEWALK
SEE NOTE 10
SEE NOTE 10
SEE NOTE 10
See Note 10
NOTE 10SEE
OF SIDEWALKFRONT EDGE
AREA
PLANTING
Min
4'-2"
AREA
PLANTING
CURBRETAINING
SIDEWALKEDGE OFFRONT
CASE F CASE G
RAMP)SIDES OFCURB (BOTHRETAINING
A A
Typ
6"
Typ
6"
SIDEWALK SIDEWALK
Max
7.5%
Max
7.5%
Max
1.5%
Max
1.5%
Max
1.5%
4'-2" Min 4'-2" Min
See Note 4
AT CURB9.0% Max Max
1.5%
Min
4'-2"
SEE NOTE 10 SEE NOTE 10
BASE Dia
0.9" Min AND 0.92" Max
TOP Dia
0.45" Min AND 0.47" Max
GUTTER PAN TRANSITION
APPLIES TO ALL CASESTYPICAL GUTTER PAN
CURB
PAVEMENT
NOTE 9
SEE
NOTE 8
SEE
DETECTABLE
FRONT OF
GUTTER IN
WARNING
NOTE 9
SEE
TRANSITION TRANSITION
RETAINING CURB6" Min HIGH RETAINING CURB
6" Min HIGH
SEE NOTE 10
RAMP SLOPECURB TO MATCH
3'-0" Typ 3'-0" Typ
1.5% Max
1.5% Max
1.5% Max
4'-2" Min
1.5% Max 1.5% Max
A A
1.5% Max
OF RAMP)(BOTH SIDESRETAINING CURB
1.5% Max
Lynn Mowry
Rebecca
C54415
1-31-23
A88A
NO SCALE
PLANS APPROVAL DATE
No.
Exp.
REG ISTERED PROFESSIONAL ENG INEER
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
CIVIL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
May 1, 2023
168
2023 STA ND A RD PLA N A 88A
13.12.11.10. 9. 8. 7. 6. 5. 4. 3. 2. 1.
covers while maintaining detectable warning width and depth.Detectable warning surface may have to be cut to allow removal of utilitythe owner prior to, or in conjunction with, curb ramp construction.the boundaries of the curb ramp will be relocated or adjusted to grade byUtility pull boxes, manholes, vaults and all other utility facilities withinSidewalk and ramp thickness "T", shall be 3½" minimum.surfaces shall conform to the requirements in the Standard Specifications.maximum gap of 1 inch is allowed on each side of the ramp. Detectable warningDetectable warning surfaces shall extend the full width of the ramp except awarning surface that extends the full width and 3'-0" depth of the ramp.unless modified in the Project Plans. Curb ramps shall have a detectableThe detectable warning surface will be a rectangle as shown at back of curb,typical gutter pan slope per Standard Plan A87A.Transition gutter pan slope from 1" of depth for each 2'-0" of width to matchGutter pan slope shall not exceed 1" of depth for each 2'-0" of width.and within 24 inches of the curb ramp shall not be steeper than 1V:20H (5.0%).Counter slopes of adjoining gutters and road surfaces immediately adjacent toand streets shall be at the same level.The adjacent surfaces at transitions at curb ramps to walks, gutters,except in Case C and Case F.to conform with longitudinal sidewalk slope adjacent to top of the ramp,Side slope of ramp flares vary uniformly from a maximum of 9.0% at curbin the Project Plans.The ramp portion of the curb ramp is a typical rectangle, unless modifiedthe Case G ramp shall be constructed in reversed position.As site conditions dictate, the retaining curb side and the flared side ofbe similar to that shown for Detail B.When ramp is located in center of curb return, crosswalk configuration mustdepressed longitudinally as in Case B or C or may be widened as in Case D.ramp and 4'-2" platform (landing) as shown in Case A, the sidewalk may beIf distance from curb to back of sidewalk is too short to accommodateincluding the conform to existing sidewalk, see Project Plans.as site conditions dictate. For specific site condition configuration,Case A through Case G curb ramps also may be used at mid block locations,The case of curb ramps used in Detail A do not have to be the same.for corner installations similar to those shown in Detail A and Detail B.As site conditions dictate, Case A through Case G curb ramps may be used NOTES:
NOTES:
DEPARTMENT OF TRANSPORTATION
STATE OF CALIFORNIA
(DETECTORS)
ELECTRICAL SYSTEMS
TYPE A LOOP DETECTOR CONFIGURATION TYPE B LOOP DETECTOR CONFIGURATION
WINDING DETAIL SAW CUT DETAIL WINDING DETAIL SAW CUT DETAIL
TYPE C LOOP DETECTOR CONFIGURATION TYPE D LOOP DETECTOR CONFIGURATION TYPE E LOOP DETECTOR CONFIGURATION
WINDING DETAIL SAW CUT DETAIL WINDING DETAIL SAW CUT DETAIL WINDING DETAIL SAW CUT DETAIL
TYPE F LOOP DETECTOR CONFIGURATION TYPE Q LOOP DETECTOR CONFIGURATION
WINDING DETAIL SAW CUT DETAIL WINDING DETAIL SAW CUT DETAIL F
S
F
S
F
S
F
S
F
S
F
S
5 TURNS
SEE NOTE 1
NOTE 1SEE
detection and bicycle lanes.Use Type D and F loops for limit lineand F installation in single lane.edge to edge is 10' for Type A, B, D, E,Typical distance separating loops fromto prevent damage to conductors.Round corners of acute angle saw cuts
3.2.1. 7'-0"
1'-0"
1'-0"
7'-0"
5 '-8"
2'-6"
1'-3"
2'-3"
6'-0"
1'-3"
2'-3" 2'-6"
6'-0"
8"
8"
10"
10"
8"
8"
3'-0"3'-0"
1'-0"
1'-0"
6'-0"
1'-0"
1'-0"
6"Max
6" Max
6'-0"
6'-0"
1'-0"
1'-0"
DIAGONAL SLOT
AT CORNERS
DIAGONAL SLOT
PLAN VIEW OF
45 °
DIMENSION PER PLAN
6'-0"
1'-0"
3'-0"3'-0"
½" WIDTH CUT
1'-0"
F
S
5 TURNS
ES-5B
NO SCALE
PLANS APPROVAL DATE
No.
Exp.
R
E
G
IS
TERED
PROFESSIONAL
ENG
IN
E
E
R
STATE OF CALIFORNIA
REGISTERED CIVIL ENGINEER
ELECTRICAL
Dist COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET
No.
TOTAL
SHEETS
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FORCOPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
May 1, 2023
542
2023STA ND ARDPLA NES-5B
1-31-23
12-31-24
E17982
Omar Mendoza
APPENDIX D: UPRR ENCROACHMENT PERMIT WILL BE PROVIDED TO CONTRACTOR UPON APPROVAL OF UPRR APPENDIX E: CALTRANS ENCROACHMENT PERMIT # 07-24-N-MC-0069 STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
ENCROACHMENT PERMIT
DOT TR-0120 (REV 05/2023)
FM 91 1436
07-24-N-MC-0069
Permit No.
ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at [email protected].
In compliance with your application of January 16, 2024 Reference Documents:
Utility Notice No.
Agreement No.
R/W Contract No.
Project code (ID):
Applicant's Reference/ Utility Work Order No.
of
of
of
CFC #:
JN935 Phase 2
07/LA/91/PM 6.01
Dist/Co/Rte/PM
January 26, 2024
Permit Approval Date
$0
Performance Bond Amount (1)
$0
Payment Bond Amount (2)
$ N/A
Bond Company
$ N/A
Bond Number (1)
$ N/A
Bond Number (2)
CITY OF GARDENA
C/O: CANNON CORPORATION
16842 Von Karman Avenue, Suite 150
Irvine CA 92606
TO:
, PERMITTEE
Remove and replace 8 existing Caltrans' owned traffic loops and perform associated traffic control activities, on Vermont Avenue at Route 91 (Artesia Freeway), in the City of Gardena within the State's highway right-of-way; all in accordance with the current State specifications and standard plans, attached special provisions, and stamped permit plans. ***Traffic Control Plan must be submitted for review and approval via Rider Permit prior to the start of construction.*** Working Hours: Per city/local agency approved work hours, or as directed by State Inspector.
Permittee and their prime contractor(s) must fill out form TR-0429 and submit to the assigned permit inspector prior to pre-job meeting.
A pre-job meeting with the assigned Caltrans Representative, Masoud Nassimi ([email protected]), (213) 999-1907, and the Caltrans Electrical Permit Inspector, Noel Aclaro ([email protected]), (213) 999-1905, is required at least 7 days prior to start of any work under this permit. Failure to do so may result in permit revocation with no prejudice. and subject to the following, PERMISSION IS HEREBY GRANTED to:
THIS PERMIT IS NOT A PROPERTY RIGHT AND DOES NOT TRANSFER WITH THE PROPERTY TO A NEW OWNER.
The following attachments are also included as part of this permit (check applicable):
YES NO General Provisions
YES NO Utility Maintenance Provisions
YES NO Storm Water Special Provisions
YES NO Special Provisions
YES NO A Cal-OSHA Permit, if required: Permit No.
YES NO As-Built Plans Submittal Route Slip for Locally Advertised Projects YES NO Storm Water Pollution Protection Plan
In addition to fee, the permittee will be billed actual costs for:
YES NO Review
YES NO Inspection
YES Field Work
(if any Caltrans effort expended)
As-built Plans are Required
YES NO
YES NO The information in the environmental documentation has been reviewed and considered prior to approval of this permit.
This permit is to be strictly construed and no other work other than specifically mentioned is hereby authorized.
No project work shall be commenced until all other necessary permits and environmental clearances have been obtained.
This permit is void unless the work is completed before July 31 , 2024 CC:
#1: Masoud M Nassimi
#2: NOEL B ACLARO
#3:
#4:
Gloria Roberts, District Director
APPROVED:
BY
{{