© 2018 California Department of Transportation. All rights reserved.
ENCROACHMENT PERMIT GENERAL PROVISIONS
TR-0045 (REV. 12/2022)
1. AUTHORITY: The California Department of
Transportation (“Department”) has authority to issue
encroachment permits under Division 1, Chapter 3,
Article 1, Sections 660 through 734 of the Streets and
Highways Code.
2. REVOCATION: Encroachment permits are revocable on
five (5) business days’ notice unless otherwise stated on the permit or otherwise provided by law, and except as
provided by law for public corporations, franchise holders, and utilities. Notwithstanding the foregoing, in an
emergency situation as determined by the Department,
an encroachment permit may be revoked immediately.
These General Provisions and any applicable Special
Provisions are subject to modification or abrogation by the Department at any time. Permittees’ joint use
agreements, franchise rights, reserved rights or any other agreements for operating purposes in State of California (“State”) highway right-of-way may be exceptions to this revocation.
3. DENIAL FOR NONPAYMENT OF FEES: Failure to pay
encroachment permit fees when due may result in
rejection of future applications, denial of encroachment permits, and revocation of the encroachment permit if
already issued.
4. PERMITTEE AUTHORIZATION FOR OTHERS TO
PERFORM WORK: This encroachment permit allows
only the Permittee and/or Permittee’s authorized
contractor or agent to work within or encroach upon the State highway right-of-way, and the Permittee may not
assign or transfer this encroachment permit. Any attempt to assign or transfer this encroachment permit shall be null and void. Permittee shall provide to the Department a list of Permittee’s authorized contractors/agents, in the form and at the time specified by the Department but if no time is specified then no later than the pre-construction meeting. Permittee shall keep the list current and shall provide updates to the Department immediately upon any
change to the list of authorized contractors/agents,
including but not limited the addition, removal, or
substitution of an authorized contractor/agent, or a new address or contact information for an existing authorized contractor/agent. Permittee is responsible for the acts and/or omissions of any person or entity acting on behalf of the Permittee, even if such person or entity is not
included on Permittee’s list of authorized contractors
and/or agents.
5. ACCEPTANCE OF PROVISIONS: Permittee, and the
Permittee’s authorized contractors and/or agents,
understand and agree to accept and comply with these
General Provisions, the Special Provisions, any and all terms and/or conditions contained in or incorporated into the encroachment permit, and all attachments to the
encroachment permit (collectively “the Permit
Conditions”), for any encroachment, work, and/or activity to be performed under this encroachment permit and/or
under color of authority of this encroachment permit.
Permittee understands and agrees the Permit Conditions
are applicable to and enforceable against Permittee as
long as the encroachment remains in, under, or over any part of the State highway right-of-way. The Permittee’s authorized contractors and/or agents, are also bound by the Permit Conditions. Non-compliance with the Permit
Conditions by the Permittee’s authorized contractor
and/or agent will be deemed non-compliance by the
Permittee.
6. BEGINNING OF WORK: When traffic is not impacted
(see General Provision Number 35), the Permittee must
notify the Department’s representative two (2) business days before starting permitted work. Permittee must notify the Department’s representative if the work is to be
interrupted for a period of five (5) business days or more, unless otherwise agreed upon. All work must be
performed on weekdays during regular work hours,
excluding holidays, unless otherwise specified in this
encroachment permit.
7. STANDARDS OF CONSTRUCTION: All work performed
within State highway right-of-way must conform to all
applicable Departmental construction standards including but not limited to: Standard Specifications, Standard
Plans, Project Development Procedures Manual,
Highway Design Manual and Special Provisions.
Other than as expressly provided by these General
Provisions, the Special Provisions, the Standard
Specifications, Standard Plans, and other applicable
Departmental standards, nothing in these General
Provisions is intended to give any third party any legal or equitable right, remedy, or claim with respect to the
encroachment permit and/or to these General Provisions
or any provision herein. These General Provisions are for the sole and exclusive benefit of the Permittee and the Department.
Where reference is made in such standards to
“Contractor” and “Engineer,” these are amended to be
read as “Permittee” and “Department’s representative,”
respectively, for purposes of this encroachment permit.
8. PLAN CHANGES: Deviations from plans, specifications, and/or the Permit Conditions as defined in General
Provision Number 5 are not allowed without prior approval from the Department’s representative and the Federal
Highway Administration (“FHWA”) representative if
applicable.
9. RIGHT OF ENTRY, INSPECTION AND APPROVAL: All
work is subject to monitoring and inspection. The United States, the State, the Department, and the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, and other state, and
federal agencies, and the FHWA, through their agents or representatives, must have full access to highway
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
ENCROACHMENT PERMIT GENERAL PROVISIONS
© 2018 California Department of Transportation. All rights reserved. facilities/encroachment area, at any and all times for the purpose of inspection, maintenance, activities needed for construction/reconstruction, and operation of the State highway right-of-way.
Upon completion of work, Permittee must request a
final inspection for acceptance and approval by the
Department. The local public agency Permittee must not
give final construction approval to its contractor until final acceptance and approval by the Department is obtained.
10. PERMIT AT WORKSITE: Permittee and Permittee’s
authorized contractors/agents must keep the permit
package and current list of authorized contractors/agents, or copies thereof, at the work site at all times and must show such documents upon request to any Department
representative or law enforcement officer. If the permit package or current list of authorized contractors/agents, or copies thereof, are not kept and made available at the work site at all times, then all work must be suspended.
11. CONFLICTING ENCROACHMENTS: Permittee must
yield start of work to ongoing, prior authorized work
adjacent to or within the limits of the Permittee’s project site. When existing encroachments conflict with
Permittee’s work, the Permittee must bear all cost for
rearrangements (e.g., relocation, alteration, removal,
etc.).
12. PERMITS, APPROVALS, AND CONCURRENCES
FROM OTHER AGENCIES AND/OR ENTITIES: This
encroachment permit is invalidated if the Permittee has not obtained all permits, approvals, and concurrences
necessary and required by law, including but not limited to those from the California Public Utilities Commission (“CPUC”), California Occupational Safety and Health
Administration (“Cal-OSHA”), local and state and federal environmental agencies, the California Coastal
Commission, and any other public agency and/or entity
having jurisdiction. Permittee is responsible for providing notice of the encroachment to, and obtaining concurrence from, any person or entity (whether public or private)
affected by the scope of work described in the
encroachment permit, regardless of whether such notice
or concurrence is required by law; the Department is not responsible to provide such notice or obtain such
concurrence. Permittee warrants all such permits,
approvals, and concurrences have been obtained before
beginning work under this encroachment permit. The
Department may, at the Department’s discretion, require the Permittee to demonstrate that Permittee has obtained all such permits, approvals, and concurrences, and
Permittee shall demonstrate this at the time and in the manner specified by the Department.
13. PEDESTRIAN AND BICYCLIST SAFETY: A safe
continuous passageway must be maintained through the
work area at existing pedestrian or bicycle facilities. At no time must pedestrians be diverted onto a portion of the street used for vehicular traffic. At locations where safe alternate passageways cannot be provided, appropriate
signs and barricades must be installed at the limits of construction and in advance of the limits of construction at the nearest crosswalk or intersection to detour
pedestrians to facilities across the street. Attention is directed to Section 7-1.04 “Public Safety,” and to Section 12-4.04 “Temporary Pedestrian Access Routes,” and to
Section 16-2.02 “Temporary Pedestrian Facility,” of the Department’s Standard Specifications, and to California Vehicle Code section 21760, subdivision (c).
14. PUBLIC TRAFFIC CONTROL: The Permittee must
provide traffic control protection, warning signs, lights, safety devices, etc., and take all other measures
necessary for the traveling public’s safety as required by law and/or the Department. While providing traffic control, the needs of all road users, including but not limited to motorists, bicyclists and pedestrians, including persons with disabilities in accordance with the Americans with Disabilities Act, must be an essential part of the work activity.
Lane, Bike Lane, Sidewalk, Crosswalk, and/or
shoulder closures must comply with the Department’s
Standard Specifications and Standard Plans for
Temporary Traffic Control Systems & Temporary
Pedestrian Access Routes, and with the applicable
Special Provisions. Where issues are not addressed in
the Standard Specifications, Standard Plans, and/or
Special Provisions, the California Manual on Uniform
Traffic Control Devices (Part 6, Temporary Traffic Control) must be followed.
15. MINIMUM INTERFERENCE WITH TRAFFIC: Permittee
must plan and conduct work so as to create the least
possible inconvenience to the traveling public (motorized vehicles, unmotorized vehicles such as bicycles,
pedestrians, person(s) with disabilities, etc.), such that traffic is not unreasonably delayed.
16. STORAGE OF EQUIPMENT AND MATERIALS: The
storage of equipment or materials is not allowed within State highway right-of-way, unless specified within the Special Provisions of this encroachment permit. If
encroachment permit Special Provisions allow for the
storage of equipment or materials within the State
highway right-of-way, the equipment and material storage must also comply with Section 7-1.04, Public Safety, of the Department’s Standard Specifications.
17. CARE OF DRAINAGE: Permittee must provide alternate
drainage for any work interfering with an existing drainage facility in compliance with the Department’s Standard
Specifications, Standard Plans, and/or as directed by the Department’s representative.
18. RESTORATION AND REPAIRS IN STATE HIGHWAY
RIGHT-OF-WAY: Permittee is responsible for restoration
and repair of State highway right-of-way resulting from permitted work (Streets and Highways Code, section 670
et seq.).
19. STATE HIGHWAY RIGHT-OF-WAY CLEAN UP: Upon
completion of work, Permittee must remove and dispose
of all scraps, refuse, brush, timber, materials, etc. off the State highway right-of-way. The aesthetics of the highway must be as it was before work started or better.
20. COST OF WORK: Unless stated otherwise in the
encroachment permit or a separate written agreement
with the Department, the Permittee must bear all costs
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
ENCROACHMENT PERMIT GENERAL PROVISIONS
© 2018 California Department of Transportation. All rights reserved. incurred for work within the State highway right-of-way and waives all claims for indemnification or contribution from the United States, the State, the Department, and
from the Directors, officers, and employees of the State and/or the Department. Removal of Permittee’s personal
property and improvements shall be at no cost to the
United States, the State, and the Department.
21. ACTUAL COST BILLING: When specified in the permit,
the Department will bill the Permittee actual costs at the currently set Standard Hourly Rate for encroachment
permits.
22. AS-BUILT PLANS: When required, Permittee must
submit one (1) set of folded as-built plans within thirty (30) calendar days after completion and acceptance of work in compliance with requirements listed as follows:
a) Upon completion of the work provided herein, the
Permittee must submit a paper set of As-Built plans
to the Department’s representative.
b) All changes in the work will be shown on the plans, as issued with the permit, including changes approved
by Encroachment Permit Rider.
c) The plans are to be prominently stamped or otherwise noted “AS-BUILT” by the Permittee’s representative
who was responsible for overseeing the work. Any
original plan that was approved with a Department
stamp, or by signature of the Department’s
representative, must be used for producing the AsBuilt plans. d) If construction plans include signing or striping, the dates of signing or striping removal, relocation, or
installation must be shown on the As-Built plans when
required as a condition of the encroachment permit.
When the construction plans show signing and
striping for staged construction on separate sheets,
the sheet for each stage must show the removal,
relocation, and installation dates of the appropriate
staged striping and signing.
e) As-Built plans must contain the Encroachment Permit
Number, County, Route, and Post Mile on each
sheet.
f) The As-Built Plans must not include a disclaimer
statement of any kind that differs from the obligations and protections provided by sections 6735 through
6735.6 of the California Business and Professions
Code. Such statements constitute non-compliance
with Encroachment Permit requirements and may
result in the Department retaining Performance
Bonds or deposits until proper plans are submitted.
Failure to comply may also result in denial of future
encroachment permits or a provision requiring a
public agency to supply additional bonding.
23. PERMITS FOR RECORD PURPOSES ONLY: When
work in the State highway right-of-way is within an area under a Joint Use Agreement (JUA) or a Consent to
Common Use Agreement (CCUA), a fee exempt
encroachment permit is issued to the Permittee for the
purpose of providing a notice and record of work. The
Permittee’s prior rights must be preserved without the
intention of creating new or different rights or obligations. “Notice and Record Purposes Only” must be stamped
across the face of the encroachment permit.
24. BONDING: The Permittee must file bond(s), in advance, in the amount(s) set by the Department and using forms
acceptable to the Department. The bonds must name the
Department as obligee. Failure to maintain bond(s) in full force and effect will result in the Department stopping all work under this encroachment permit and possibly
revoking other encroachment permit(s). Bonds are not
required of public corporations or privately-owned utilities unless Permittee failed to comply with the provisions
and/or conditions of a prior encroachment permit. The
surety company is responsible for any latent defects as provided in California Code of Civil Procedure section
337.15. A local public agency Permittee also must comply with the following requirements:
a) In recognition that project construction work done on State property will not be directly funded and paid by
State, for the purpose of protecting stop notice
claimants and the interests of State relative to
successful project completion, the local public agency
Permittee agrees to require the construction
contractor to furnish both a payment and performance
bond in the local public agency’s name with both
bonds complying with the requirements set forth in
Section 3-1.05 Contract Bonds of the Department’s
Standard Specifications before performing any
project construction work.
b) The local public agency Permittee must defend,
indemnify, and hold harmless the United States, the
State and the Department, and the Directors, officers,
and employees of the State and/or Department, from
all project construction related claims by contractors, subcontractors, and suppliers, and from all stop
notice and/or mechanic’s lien claimants. The local
public agency also agrees to remedy, in a timely
manner and to the Department’s satisfaction, any
latent defects occurring as a result of the project
construction work.
25. FUTURE MOVING OF INSTALLATIONS: Permittee
understands and agrees to relocate a permitted
installation upon notice by the Department. Unless under prior property right or agreement, the Permittee must
comply with said notice at the Permittee’s sole expense.
26. ENVIRONMENTAL:
a) ARCHAEOLOGICAL/HISTORICAL: If any
archaeological or historical resources are identified or encountered in the work vicinity, the Permittee must
immediately stop work, notify the Department’s
representative, retain a qualified archaeologist who
must evaluate the site at Permittee’s sole expense,
and make recommendations to the Department’s
representative regarding the continuance of work.
b) HAZARDOUS MATERIALS: If any hazardous waste
or materials (such as underground storage tanks,
asbestos pipes, contaminated soil, etc.) are identified or encountered in the work vicinity, the Permittee
must immediately stop work, notify the Department’s
representative, retain a qualified hazardous
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
ENCROACHMENT PERMIT GENERAL PROVISIONS
© 2018 California Department of Transportation. All rights reserved. waste/material specialist who must evaluate the site
at the Permittee’s sole expense, and make
recommendations to the Department’s representative
regarding the continuance of work.
Attention is directed to potential aerially deposited
lead (ADL) presence in unpaved areas along
highways. It is the Permittee’s responsibility to take all appropriate measures to protect workers in
conformance with California Code of Regulations
Title 8, Section 1532.1, “Lead,” and with Cal-OSHA
Construction Safety Orders, and to ensure roadway
soil management is in compliance with Department of
Toxic Substances Control (DTSC) requirements.
c) BIOLOGICAL: If any regional, state, or federally listed biological resource is identified or encountered in the work vicinity, the Permittee must immediately stop
work, notify the Department’s representative, retain a
qualified biologist who must evaluate the site at
Permittee’s sole expense, and make
recommendations to the Department’s representative
regarding the continuance of work.
27. PREVAILING WAGES: Work performed by or under an
encroachment permit may require Permittee’s contractors and subcontractors to pay appropriate prevailing wages
as set by the California Department of Industrial
Relations. Inquiries or requests for interpretations relative to enforcement of prevailing wage requirements must be
directed to the California Department of Industrial
Relations.
28. LIABILITY, DEFENSE, AND INDEMNITY: The Permittee
agrees to indemnify and save harmless the United States, the State, the Department, and the Directors, officers, employees, agents and/or contractors of the State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages, costs, liability, suits, or actions of every name, kind, and description, including but not limited to those brought for or on account of property damage, invasion of privacy, violation or deprivation of a right under a state or federal law, environmental damage or penalty, or injury to or death of any person including but not limited to members of the public, the Permittee, persons employed by the Permittee, and/or persons
acting on behalf of the Permittee, arising out of or in connection with: (a) the issuance and/or use of this
encroachment permit; and/or (b) the encroachment, work, and/or activity conducted pursuant to this encroachment permit, or under color of authority of this encroachment permit but not in full compliance with the Permit
Conditions as defined in General Provision Number 5
(“Unauthorized Work or Activity”); and/or (c) the
installation, placement, design, existence, operation,
and/or maintenance of the encroachment, work, and/or
activity; and/or (d) the failure by the Permittee, or by anyone acting for or on behalf of the Permittee, to perform the Permittee’s obligations under any part of the Permit Conditions as defined in General Provision Number 5, in respect to maintenance or any other obligation; and/or (e) any change to the Department’s property or adjacent
property, including but not limited to the features or
conditions of either of them, made by the Permittee or
anyone acting on behalf of the Permittee; and/or (f) a
defect or obstruction related to or caused by the
encroachment, work, and/or activity whether conducted in compliance with the Permit Conditions as defined in
General Provision Number 5 or constituting Unauthorized Work or Activity, or from any cause whatsoever. The duty of the Permittee to indemnify and save harmless includes the duties to defend as set forth in Section 2778 of the Civil Code.
It is the intent of the Department and the Permittee
that except as prohibited by law, the Permittee will defend, indemnify, and hold harmless as set forth in this General Provision Number 28 regardless of the existence or
degree of fault or negligence, whether active or passive, primary or secondary, on the part of: the United States, the State; the Department; the Directors, officers,
employees, agents and/or contractors of the State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors; the Permittee; persons employed by the Permittee; and/or persons
acting on behalf of the Permittee.
The Permittee waives any and all rights to any type of
expressed or implied indemnity from or against the United States, the State, the Department, and the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors.
The Permittee understands and agrees to comply
with the obligations of Titles II and III of the Americans with Disabilities Act in the conduct of the encroachment, work, and/or activity whether conducted pursuant to this encroachment permit or constituting Unauthorized Work
or Activity, and further agrees to defend, indemnify, and save harmless the United States, the State, the
Department, and the Directors, officers, employees,
agents, and/or contractors of the State and/or of the
Department, including but not limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages, costs, penalties, liability,
suits, or actions of every name, kind, and description
arising out of or by virtue of the Americans with Disabilities Act.
The Permittee understands and agrees the Directors,
officers, employees, agents, and/or contractors of the
State and/or of the Department, including but not limited to the Director of Transportation and the Deputy Directors, are not personally responsible for any liability arising from or by virtue of this encroachment permit.
For the purpose of this General Provision Number 28
and all paragraphs herein, “contractors of the State and/or of the Department” includes contractors, and their
subcontractors, under contract to the State and/or the
Department.
This General Provision Number 28 and all
paragraphs herein take effect immediately upon issuance of this encroachment permit, and apply before, during,
and after the encroachment, work, and/or activity
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
ENCROACHMENT PERMIT GENERAL PROVISIONS
© 2018 California Department of Transportation. All rights reserved. contemplated under this encroachment permit, whether
such work is in compliance with the Permit Conditions as defined in General Provision Number 5 or constitutes
Unauthorized Work or Activity, except as otherwise
provided by California law. The Permittee’s obligations to defend, indemnify, and save harmless under this General Provision Number 28 take effect immediately upon
issuance of this encroachment permit and have no
expiration date, including but not limited to situations in which this encroachment permit expires or is revoked, the work or activity performed under this encroachment
permit is accepted or not accepted by the Department, the encroachment, work, and/or activity is conducted in
compliance with the Permit Conditions as defined in
General Provision Number 5 or constitutes Unauthorized
Work or Activity, and/or no work or activity is undertaken by the Permittee or by others on the Permittee’s behalf.
If the United States or an agency, department, or
board of the United States is the Permittee, the first two paragraphs of this General Provision Number 28
(beginning “The Permittee agrees to indemnify…” and “It is the intent of the parties…”) are replaced by the following paragraph:
Claims for personal injury, death, or property damage
allegedly caused by the negligent or wrongful act or
omission of any employee of the United States acting
within the scope of their official duties are subject to the Federal Tort Claims Act, as amended, 28 U.S.C. § 1346
and § 2671 et seq. (Chapter 171).
29. NO PRECEDENT ESTABLISHED: This encroachment
permit is issued with the understanding that it does not establish a precedent.
30. FEDERAL CIVIL RIGHTS REQUIREMENTS FOR
PUBLIC ACCOMMODATION:
a) As part of the consideration for being issued this
encroachment permit, the Permittee, on behalf of
Permittee and on behalf of Permittee’s personal
representatives, successors in interest, and assigns,
does hereby covenant and agree that:
i) No person on the grounds of race, color, or
national origin may be excluded from participation
in, be denied the benefits of, or be otherwise
subjected to discrimination in the use of said
facilities.
ii) That in connection with the construction of any
improvements on said lands and the furnishings
of services thereon, no discrimination must be
practiced in the selection and retention of first-tier
subcontractors in the selection of second-tier
subcontractors.
iii) That such discrimination must not be practiced
against the public in their access to and use of the
facilities and services provided for public
accommodations (such as eating, sleeping, rest,
recreation), and operation on, over, or under the
space of the State highway right-of-way.
iv) That the Permittee must use the premises in
compliance with all other requirements imposed
pursuant to Title 15, Code of Federal
Regulations, Commerce and Foreign Trade,
Subtitle A. Office of the Secretary of Commerce,
Part 8 (15 C.F.R. Part 8) and as said Regulations
may be amended.
b) That in the event of breach of any of the above
nondiscrimination covenants, the State and the
Department have the right to terminate this
encroachment permit and to re-enter and repossess
said land and the facilities thereon and hold the same
as if said permit had never been made or issued.
31. MAINTENANCE: The Permittee is responsible at
Permittee’s sole expense for the encroachment, and the
inspection, maintenance, repair, and condition thereof, and is responsible to ensure the encroachment does not
negatively impact State highway safety, maintenance,
operations, construction, State facilities, activities related to construction/reconstruction, or other encroachments.
The Permittee’s obligations in the preceding sentence
take effect immediately upon issuance of this
encroachment permit and continue until the
encroachment is entirely and permanently removed.
Additional encroachment permits or approval documents
may be required authorizing work related to inspection, repair, and/or maintenance activities. Contact the
Department for information.
32. SPECIAL EVENTS: In accordance with subdivision (a) of Streets and Highways Code section 682.5 and 682.7, the
Department is not responsible for the conduct or
operation of the permitted activity, and the applicant
agrees to defend, indemnify, and hold harmless the
United States, the State, the Department, and the
Directors, officers, employees, agents, and contractors of the State and/or of the Department, including but not
limited to the Director of Transportation and the Deputy Directors, from any and all claims, demands, damages,
costs, liability, suits, or actions of every name, kind and description arising out of any activity for which this
encroachment permit is issued.
The Permittee is required, as a condition of this
encroachment permit, for any event that awards prize
compensation to competitors in gendered categories, for any participant level that receives prize compensation, to ensure the prize compensation for each gendered
category is identical at each participant level. (Streets and Highways Code, section 682.7.)
The Permittee understands and agrees to comply
with the obligations of Titles II and III of the Americans with Disabilities Act in the conduct of the event, and
further agrees to defend, indemnify, and save harmless
the United State, the State and the Department, and the Directors, officers, and employees of the State and/or
Department, including but not limited to the Director of the Department and the Deputy Directors, from any and all
claims, demands, damages, costs, liability, suits, or
actions of every name, kind and description arising out of or by virtue of the Americans with Disabilities Act.
33. PRIVATE USE OF STATE HIGHWAY RIGHT-OF-WAY:
State highway right-of-way must not be used for private purposes without compensation to the State. The gifting STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION
ENCROACHMENT PERMIT GENERAL PROVISIONS
© 2018 California Department of Transportation. All rights reserved. of public property uses and therefore public funds is
prohibited under the California Constitution, Article XVI, Section 6.
34. FIELD WORK REIMBURSEMENT: Permittee must
reimburse the Department for field work performed by or on behalf of the Department to correct or remedy issues created by the Permittee or by others acting on behalf of the Permittee, including but not limited to hazards or
damaged facilities, or to clear refuse, debris, etc. not attended to by the Permittee or by others acting on behalf of the Permittee.
35. LANE CLOSURE REQUEST SUBMITTALS AND
NOTIFICATION OF CLOSURES TO THE
DEPARTMENT: Lane closure request submittals and
notifications must be in accordance with Section 12-4.02, and Section 12.4-04, of the Department’s Standard
Specifications or as directed by the Department’s
representative. The Permittee must notify the
Department’s representative and the Traffic Management
Center (“TMC”) before initiating a lane closure or
conducting an activity that may cause a traffic impact. In emergency situations when the corrective work or the
emergency itself may affect traffic, the Department’s
representative and the TMC must be notified as soon as
possible.
36. SUSPENSION OF TRAFFIC CONTROL OPERATION:
The Permittee, upon notification by the Department’s
representative, must immediately suspend all traffic lane, bike lane, sidewalk, crosswalk, and/or shoulder closure operations and any operation that impedes the flow of
traffic. All costs associated with this suspension must be borne by the Permittee.
37. UNDERGROUND SERVICE ALERT (USA)
NOTIFICATION: Any excavation requires compliance
with the provisions of Government Code section 4216 et
seq., including but not limited to notice to a regional notification center, such as Underground Service Alert
(USA). The Permittee must provide notification to the
Department representative at least five (5) business days before, and the regional notification center at least fortyeight (48) hours before, performing any excavation work within the State highway right-of-way.
38. COMPLIANCE WITH THE AMERICANS WITH
DISABILITIES ACT (ADA): All work within the State
highway right-of-way to construct and/or maintain any
public facility must be designed, maintained, and
constructed strictly in accordance with all applicable
Federal Access laws and regulations (including but not
limited to Section 504 of the Rehabilitation Act of 1973, codified at 29 U.S.C. § 794), California Access laws and regulations relating to ADA, along with its implementing regulations, Title 28 of the Code of Federal Regulations Parts 35 and 36 (28 C.F.R., Ch. I, Part 35, § 35.101 et seq., and Part 36, § 36.101 et seq.), Title 36 of the Code of Federal Regulations Part 1191 (36 C.F.R., Ch. XI, Part 1191, § 1119.1 et seq.), Title 49 of the Code of Federal Regulations Part 37 (49 C.F.R., Ch. A, Part 37, § 37.1 et seq.), the United States Department of Justice Title II and Title III for the ADA, and California Government Code
section 4450 et seq., which require public facilities be made accessible to persons with disabilities.
Notwithstanding the requirements of the previous
paragraph, all construction, design, and maintenance of public facilities must also comply with the Department’s Design Information Bulletin 82, “Pedestrian Accessibility Guidelines for Highway Projects” and Standard Plans &
Specifications on “Temporary Pedestrian Access
Routes.”
39. STORMWATER: The Permittee is responsible for full
compliance with the following:
a) For all projects, the Department’s Storm Water
Program and the Department’s National Pollutant
Discharge Elimination System (NPDES) Permit
requirements under Order No. 2012-0011-DWQ,
NPDES No CAS000003; and
b) In addition, for projects disturbing one acre or more of soil, with the California Construction General
Permit Order No. 2009-0009-DWQ, NPDES No
CAS000002; and
c) In addition, for projects disturbing one acre or more of soil in the Lahontan Region with Order No. R6T-2016-
0010, NPDES No CAG616002.
d) For all projects, it is the Permittee’s responsibility to install, inspect, repair, and maintain all facilities and devices used for water pollution control practices
(Best Management Practices/BMPs) before
performing daily work activities.
APPENDIX F: REFLECTIVE STREET NAME SIGN DETAILS AND SPECIFICATIONS N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DRAWN BY
AA/MC
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PLANS PREPARED BY:
GS
NP/KD
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
5/23/2024
5/23/2024
5/23/2024 47
E
GI N
L
S O
ION
FES
A
REE NIA
A IF OF C L
RO
N
P
E
IS
RET
D
ER
G
T
E AT
S
R
16842 Von Karman Avenue, Suite 150
Irvine, CA 92606 P 909.753.8111 F 909.753.0775
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE.
PROJECT JN 935 PHASE 2
1. ALL CROSSWALKS, ARROWS, STOPBARS, AND LEGENDS SHALL BE THERMOPLASTIC MATERIAL.
2. RAISED PAVEMENT MARKERS SHALL BE CEMENTED TO THE PAVEMENT WITH HOT MELT BITUMINOUS ADHESIVE.
3. FURNISH AND INSTALL TEMPORARY MARKERS IMMEDIATELY AFTER PAVING, SPACED AT 25 ft MAXIMUM.
4. REMOVE ALL EXISTING PAVEMENT MARKINGS BY WET SANDBLASTING (CROSS WALKS, STOP LEGENDS, ETC.). EXISTING PAVEMENT MARKINGS AND STRIPINGS TO BE REMOVED ARE NOT SHOWN ON THE PLAN. FIELD VERIFY LOCATIONS.
5. REMOVE AND DISPOSE OF ALL EXISTING RAISED PAVEMENT MARKERS WITHIN THE PROJECT LIMITS. PAYMENT SHALL BE INCLUDED IN BID ITEM PRICE FOR FURNISH AND INSTALL PAVEMENT MARKERS.
6. ADJUST UTILITY VALVE COVERS, UTILITY BOXES, TRAFFIC SIGNAL BOXES, ETC. TO FINISH GRADE. PAYMENT SHALL BE INCLUDED IN ADJACENT CONSTRUCTION.
7. ALL SURVEY CENTERLINE TIES AND MONUMENTS THAT ARE DAMAGED OR REMOVED SHALL BE RE-ESTABLISHED. THE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
DIVISION SHALL ESTABLISH CENTER LINE MONUMENTS AND TIES AT ALL STREET
INTERSECTIONS WITHIN THE PROJECT LIMITS WHERE NONE EXISTED PRIOR TO CONSTRUCTION. SEE TECHNICAL PROVISIONS.
8. PROVIDE TRAFFIC CONTROL PER TECHNICAL PROVISIONS.
9. ALL STREETS ARE DRAWN WITH BREAK LINES FOR DRAWING PURPOSES. BIDS SHALL BE BASED ON STATIONING AND FIELD VERIFICATION.
10. 24 HOUR NOTICE FOR ALL INSPECTIONS REQUIRED.
11. CATCH BASINS NOT DRAWN FOR CLARITY.
12. CONTRACTORS SHALL REMOVE AND DISPOSE OF ALL TRASH AND BROKEN BRANCHES BEFORE AND AFTER PAVING.
13. PRIOR TO CUTTING OF ANY ROOTS, CALL PARKS DIVISION AT (310)217-9564 FOR APPROVAL.
14. PROTECT ALL STORM DRAINS, CATCH BASINS, ETC. WITH SAND BAGS, FABRIC AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES.
15. STREET CENTERLINE AS SHOWN ON PLAN IS APPROXIMATE.
16. PRIOR TO ANY WORK WITHIN UPRR R/W OR ANY WORK AFFECTING GRADE CROSSING
OPERATIONS, CALL UPRR MANAGER OF PUBLIC PROJECTS REPRESENTATIVE NICK VINEYARD AT (909)222-5659.
TITLE SHEET
GENERAL NOTES:
UTILITY COMPANY CONTACTS
SERVICES CONTACT PERSON/COMPANY TELEPHONE NO.
MANUEL MIGUELES
505 MAPLE AVE
TORRANCE, CA 90503
SCE (310) 720-6086
AARON CUN
700 N LONG BEACH BLVD
COMPTON, CA 90221
(213) 231-3270
GOLDEN STATE
WATER
AT & T CATHY HURTADO
600 E GREEN ST, RM 300
PASADENA, CA 91101
(510) 645-2929
LA WATER
AND POWER
UNDERGROUND SUBSTRUCTURE DESIGN
111 N HOPE STREET, #813
LOS ANGELES, CA 90012
(213) 367-2659
LA SANITATION ENGINEERING COUNTER
LOS ANGELES SANITATION DISTRICT
P.O. BOX 4998, WHITTIER, CA 90607-4998
(562) 908-4288
TPx
COMMUNICATION
MARK DENNING
2698 WHITE RD
IRVINE CA, 92614
(949) 864-0296
MICHAEL CARBAJAL
630 E FOOTHILL BLVD
SAN DIMAS, CA 91773
(909) 394-2272
SO CAL GAS
ZAYO GROUP GEORGE HUSS
1060 HARDEES DRIVE
ABERDEEN, MD 21001
CROWN CASTLE FIBER DIG TEAM
1500 CORPORATE DR
CANONSBURG, PA 15317
(888) 632-0931
(443) 403-2023
VERIZON ASG INVESTIGATIONS TEAM
3301 MATRIX DR, STE 100
RICHARDSON, TX 75082
(732) 335-5588
CALIFORNIA
WATER SERVICE
FRANK SCOTTY
2632 W. 237TH ST
TORRANCE, CA 90505
(310) 257-1400
CITY OF LA CITY REPRESENTATIVE
1149 S BROADWAY #200
LOS ANGELES, CA 90015
(213) 847-1498
CENTURY LINK AREA REPRESENTATIVE
1025 ELDORADO BOULEVARD
BROOMFIELD, CO 80021
(877) 366-8344
CITY OF TORRANCE
WATER DEPARTMENT
ALAN BERNDT
20500 MADRONA AVE
TORRANCE, CA 90630
(310) 618-2916
WEST BASIN
MUNICIPAL
WATER DISTRICT
FRANK FUCHS
17140 S AVALON BL, #210
CARSON, CA 90746
(310) 217-2411
CITY OF GARDENA
STREET IMPROVEMENT PROJECT
ABD ABANDONED
A.C./AC ASPHALT CONCRETE
AVE AVENUE
BCR BEGIN CURB RETURN
BLVD BOULEVARD
BM BENCHMARK
BMP BEST MANAGEMENT PRACTICE
BW BACK OF SIDEWALK
C CONDUIT
CAB CRUSHED AGGREGATE BASE
CB CATCH BASIN
CF CURB FACE
CENTERLINE
COMM COMMUNICATION
C&G CURB AND GUTTER
C-C CENTER TO CENTER
DLC DETECTOR LEAD-IN
CABLE
DR DRIVE
DWY DRIVEWAY
EA/EA. EACH
ECR END CURB RETURN
E/O EAST OF
EG EDGE OF GUTTER
E/ELEC ELECTRICAL
EMH ELECTRICAL MANHOLE
EX/EX. EXISTING
FH FIRE HYDRANT
FMH FIBER MANHOLE
FS FINISHED SURFACE
G GAS
IISNS INTERNALLY ILLUMINATED STREET
NAME SIGN
L.E.D. LIGHT EMITTING DIOD
LF/L.F. LINEAR/ LINEAL FEET
LS/L.S. LUMP SUM
LT LEFT
M.A. MAST ARM
MH/M.H. MANHOLE
NAVD NORTH AMERICAN VERTICAL DATUM
NTS NOT TO SCALE
NW NORTHWEST
PP POWER POLE
PCC PORTLAND CEMENT CONCRETE
PL PLACE
PPB PEDESTRIAN PUSH BUTTON
PROPERTY LINE
PROP PROPOSED
PUD PUBLIC UTILITIES DEPARTMENT
RSP REVISED STANDARD PLAN
RT RIGHT
RR RAILROAD
R/W/ R/W RIGHT-OF-WAY
SCO SEWER CLEANOUT
S SEWER
SD STORM DRAIN
SDMD STORM DRAIN MANHOLE
SF SQUARE FEET
S'LY SOUTHERLY
SPPWC STANDARD PLANS FOR
PUBLIC WORKS CONSTRUCTION
SMH SEWER MANHOLE
S/O SOUTH OF
SS STREET SIGN
ST STREET
STA STATION
STD/STD. STANDARD
TEL TELEPHONE
TMH TELEPHONE MANHOLE
TSB TRAFFIC SIGNAL BOX
TSP TRAFFIC SIGNAL POLE
VAR VARIES
VLT VAULT
W/WTR WATER
WM WATER METER
WV WATER VALVE
ABBREVIATIONS:
PUBLIC RIGHT OF WAY
LEGEND
RECONSTRUCT SIDEWALK
RECONSTRUCT CURB & GUTTER
RECONSTRUCT DRIVEWAY
CITY BOUNDARY
FULL-DEPTH PAVEMENT RECONSTRUCTION
COLDMILL PAVEMENT PER CONSTRUCTION
NOTE 17
1 8-1059
6/5/2024
170th ST. DENKER AVE. EVELYN AVE. VAN NESS AVE. WESTERN AVE.
ST. 182 nd
ELECTRIC ST.
ARTESIA BLVD.
178TH ST.
166 th ST. NORMANDIE AVE.
169th. ST. VERMONT AVE.
91 110 PROJECT
LOCATION
JN 935 PHASE 2
VICINITY MAP
N T S NTS
6/5/2024 6/5/2024 6/5/2024 6/5/2024
GARY SOLSONA RCE 68420
DIRECTOR'S SIGNATURE ON TITLEBLOCK CONSTITUTES
SIGNATURES FOR ALL SHEETS IN THE PLAN SET.
SHEET # DESCRIPTION
1 OF 47 TITLE SHEET
2 OF 47 TYPICAL SECTIONS AND DETAILS SHEET
3 TO 6 OF 47 STREET IMPROVEMENT PLAN
DRAWING TITLE:
7 TO 11 OF 47 TRAFFIC SIGNAL MODIFICATION PLAN
12 TO 14 OF 47 SIGNING AND STRIPING PLAN
15 TO 47 OF 47 LANDSCAPE IMPROVEMENT PLAN
6/17/24
14 PROTECT IN PLACE
REMOVE, SALVAGE, AND REINSTALL SIGN AND POST IN
SAME LOCATION
1 REMOVE AND DISPOSE EXISTING ASPHALT PAVEMENT.
FOR INSTALLATION OF NEW TRAFFIC SIGNAL CONDUIT
PER TRAFFIC SIGNAL MODIFICATION PLANS. FURNISH
AND RECONSTRUCT FULL DEPTH ASPHALT PAVEMENT
PER CITY STD ST-20
2 REMOVE AND DISPOSE OF EXISTING PORTION OF MEDIAN.
FURNISH AND RECONSTRUCT MEDIAN CURB PER CITY
STD-7, DETAIL C-4, LENGTH PER PLAN
3 RECONSTRUCT AFFECTED PORTION OF
LANDSCAPE/HARDSCAPE/IRRIGATION WITHIN MEDIAN
PER LANDSCAPE PLANS
4 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER.
FURNISH AND RECONSTRUCT PCC CURB AND GUTTER OVER
6” CAB PER CITY OF GARDENA STD. ST-7, DETAIL C-1
5 REMOVE AND DISPOSE OF EXISTING SIDEWALK/ PAVEMENT.
FURNISH AND RECONSTRUCT 4” PCC OVER EXISTING
RECOMPACTED SUBGRADE AND/OR NEW SIDEWALK PER
CITY STD. ST-5B
6 REMOVE AND DISPOSE OF EXISTING CONCRETE DRIVEWAY.
FURNISH AND RECONSTRUCT CONCRETE DRIVEWAY PER
CITY STD ST-1-A
7 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP.
FURNISH AND RECONSTRUCT ACCESS RAMP PER MODIFIED
CITY STD. ST-18, DETAIL 8, SEE SHEET 2
8 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP.
FURNISH AND RECONSTRUCT ACCESS RAMP PER SPPWC
STD 111-5, CASE D TYPE 2
9 REMOVE AND DISPOSE OF EXISTING CROSS GUTTER PANEL.
FURNISH AND RECONSTRUCT CROSS GUTTER PANEL PER
CITY STD ST-3
10 SEE LANDSCAPE DEMOLITION PLANS FOR REMOVAL OF
EXISTING HARDSCAPE. PROTECT IN PLACE EXISTING MEDIAN
CURB.
11 12 INSTALL 2" SCHEDULE 80 ELECTRICAL CONDUIT
STREET IMPROVEMENT NOTES STREET IMPROVEMENT NOTES
ADJUST MANHOLE FRAME AND COVER TO GRADE PER
CITY STD ST-9 (BY OTHERS)
15 16 ADJUST UTILITY VALVE TO GRADE (BY OTHERS)
COLDMILL PAVEMENT, 2" THICK, FULL DEPTH. REPAIR
ALL HOLES, SPALLS, JOINTS AND CRACK SEAL PER
TECHNICAL PROVISIONS. FURNISH AND CONSTRUCT 2"
THICK ARHM PG 64-16
17 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP.
FURNISH AND RECONSTRUCT CURB RAMP PER MODIFIED
SPPWC STD 111-5, CASE B, TYPE 2. MODIFICATION: BACK OF
WALK PER PLAN
13 REMOVE INTERFERING PORTIONS OF EXISTING SIDEWALK
AND INSTALL 11"X17" PULLBOX (BROOKS NO. 36-PB SERIES
WITH BOLT DOWN CONCRETE COVER, OR APPROVED EQUAL)
19 TRENCH AND INSTALL 2" PVC SCHEDULE 40 CONDUIT
SLEEVE (FOR IRRIGATION) AND 1-1/2" PVC SCHEDULE 40
CONDUIT SLEEVE (FOR CONTROLLER WIRING).
BACKFILL AND RESURFACE PAVEMENT PER TRENCH
RESURFACING DETAIL 20 ON SHEET 2
20 FURNISH AND INSTALL 1-1/2" WATER METER WITH 2"
SERVICE LINE PER GOLDEN STATE WATER COMPANY
STD. DWG. NO. P-27 (400 SERIES HERSEY POSITIVE
DISPLACEMENT WITH RAPID READ REGISTRATION) AND
1-1/2" REDUCED PRESSURE PRINCIPLE BACKFLOW
PREVENTION ASSEMBLY PER DETAIL B ON IRRIGATION
DETAILS SHEET 34
21 INSTALL 20AMP CIRCUIT BREAKER IN EXISTING SERVICE
CABINET
22 INSTALL 2#12, 1#12 GND CONDUCTORS FOR
LANDSCAPING CONTROL IN TRAFFIC SIGNAL CONDUIT
23 INSTALL 2"C-2#12, 1#12 GND CONDUCTORS FOR
LANDSCAPING CONTROL
24 SAWCUT AND REMOVE 10" THICK EXISTING AC/AB
PAVEMENT AND CONSTRUCT 10" THICK AC BASE
COURSE OVER COMPACTED NATIVE (95% RELATIVE
COMPACTION) PER DETAIL 25 ON SHEET 2
25 INSTALL LOOP DETECTOR PER CALTRANS STD ES-5A AND
ES-5B. FOR THE (4) LEFT TURN LOOPS, USE (1) TYPE F
LIMIT LINE LOOP AND (3) TYPE E LOOPS AS PER CURRENT
CALTRANS STANDARD PLANS. FOR THE (4) ADVANCE
LOOPS, USE (4) TYPE E LOOPS PER CURRENT CALTRANS
STANDARD PLANS.
26 ADJUST MANHOLE FRAME AND COVER TO GRADE PER
CITY STD ST-9
27 28 ADJUST WATER VALVE TO GRADE
RELOCATE EXISTING TRAFFIC SIGNAL PULL BOX. SEE SHEET
11 FOR LOCATION OF NEW TRAFFIC SIGNAL PULL BOX
29 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP.
FURNISH AND RECONSTRUCT ACCESS RAMP PER
CALTRANS STD A88A, CASE B
30 CONSTRUCT PCC MEDIAN CURB TAPER PER SPPWC STD
140-3, OFFSET "W" AND TAPER LENGTH "L" PER PLAN
31 REMOVE EXISTING AC/AB PAVEMENT AND NATIVE
MATERIAL AND CONSTRUCT 10" THICK AC BASE COURSE
OVER COMPACTED NATIVE (95% RELATIVE COMPACTION)
PER DETAIL 32 ON SHEET 2
32 INSTALL DETECTABLE WARNING SURFACE ON EXISTING
SIDEWALK (3' LONG AND FULL WIDTH OF SIDEWALK).
COLOR AND TYPE OF DETECTABLE WARNING SURFACE
SHALL COMPLY WITH CITY STD ST-18, NOTE 8
33 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER.
CONSTRUCT VARIABLE HEIGHT PCC CURB AND GUTTER
OVER 6" CAB PER MODIFIED CITY OF GARDENA STD. ST-7,
DETAIL C-1. MODIFICATION: CONSTRUCT CURB HEIGHT
TRANSITION FROM 0" CF TO 6" CF, AT 4.5% MAX GRADE
18 TRAFFIC SIGNAL NOTES:
FURNISH AND INSTALL NEW BATTERY BACKUP SYSTEM COMPLETE IN NEW EXTERNAL BACKPACK CABINET.
REMOVE EXISTING 332 CABINET WITH CARE. RETURN CABINET AND ALL CONTENTS TO CITY TRAFFIC SIGNAL DIVISION.
REMOVE AND DISPOSE OF CABINET FOUNDATION COMPLETE. FURNISH AND INSTALL NEW TYPE 332 CABINET ON NEW FOUNDATION WITH NEW MODEL 2070 ATC CONTROLLER. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
REMOVE EXISTING TRAFFIC SIGNAL CABINET AND TEMPORARILY INSTALL TO MAINTAIN SIGNAL OPERATION.
REMOVE EXISTING FOUNDATION AND INSTALL NEW FOUNDATION WITH NOTED CONDUIT SIZES. REINSTALL EXISTING TRAFFIC SIGNAL CABINET.
FURNISH AND INSTALL NEW OPTICOM EMERGENCY VEHICLE PREEMPTION SENSOR ON TRAFFIC SIGNAL EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
FURNISH AND INSTALL NEW TYPE E LOOPS PER CITY OF GARDENA STANDARD DETAIL ST-24.
INSTALL CONDUIT INTO EXISTING PULL BOX.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
REMOVE AND SALVAGE EQUIPMENT.
EQUIPMENT OR MATERIAL TO BE REMOVED AND BECOME THE PROPERTY OF THE CONTRACTOR.
RELOCATE EQUIPMENT.
CONNECT NEW AND EXISTING CONDUIT. REMOVE EXISTING CONDUCTORS AND INSTALL CONDUCTORS AS INDICATED.
1 2
3 4
5 CB
BC
RS
RC
RL
CC
STRIPING NOTES:
FURNISH AND INSTALL 8" WHITE BARRIER LINE AS SHOWN PER CALTRANS STD. NO. A20D, DETAIL 38.
FURNISH AND INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLANS A24A-A24F.
FURNISH AND INSTALL 4"X7' WHITE LANE LINE @ 17' GAP, 50' PAINT ON INTERSECTION APPROACH AND DEPARTURE PER CALTRANS STD. NO. A20A, DETAIL 9.
FURNISH AND INSTALL 12" WHITE LIMIT LINE/CROSSWALK LINE PER CALTRANS STD. NO. A24E.
FURNISH AND INSTALL 4" DOUBLE-YELLOW LINE AS SHOWN PER CALTRANS STD. NO. A20A, DETAIL 21.
FURNISH AND INSTALL 8" WHITE LINE & TYPE C RED-CLEAR RETROREFLECTIVE MARKER PER STD. NO. A20F DETAIL 42.
FURNISH AND INSTALL GRADE CROSSING PAVEMENT MARKING PER CA MUTCD SECTION 8B.27.
FURNISH AND INSTALL 6" WHITE LINE PER STD. NO. A20D DETAIL 40.
REMOVE CONFLICTING STRIPING AND/OR PAVEMENT MARKING.
FURNISH AND INSTALL 12" WHITE CHEVRON LINE @ C-C DISTANCE AS SHOWN. 1 2
3 4
5 6
7 8
9 10
(ASSUMED EX CROWN LOCATION)
EX PAVEMENT SECTION
EX PAVEMENT SECTION
EX MEDIAN CURB
6"
1% MIN
TO 2%
MAX
EXIST 6" CF
PROP PAVEMENT FS
VARIES 2' TO 14'
3 4 JOIN EX
VARIES
11' TO 15'
VARIES 2.9' N/O TO 10.4' S/O
10" THICK AC
BASE COURSE
(ASSUMED EX CROWN LOCATION)
EX PAVEMENT SECTION
EX PAVEMENT SECTION
EX MEDIAN
CURB
6"
1% MIN
TO 2%
MAX EXIST 6" CF
PROP PAVEMENT
FS
VARIES
3' TO 9'
3 4 JOIN EX
VARIES
2' TO 4'
VARIES 1.0' N/O TO 7.5' S/O
10" THICK AC
BASE COURSE
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DRAWN BY
AA/MC
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PLANS PREPARED BY:
GS
NP/KD
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
5/21/2024
5/21/2024
5/21/2024 47
E
GI N
L
S O
ION
FES
A
REE NIA
A IF OF C L
RO
N
P
E
IS
RET
D
ER
G
T
E AT
S
R
16842 Von Karman Avenue, Suite 150
Irvine, CA 92606 P 909.753.8111 F 909.753.0775 TYPICAL SECTIONS AND DETAILS SHEET
EX CURB AND GUTTER
EX CURB AND GUTTER
VARIES 9' TO 10' VARIES 45' TO 58' VARIES 43' TO 45' VARIES 10' TO 12'
EX CURB AND GUTTER EX CURB AND GUTTER
VARIES 10' TO 24' VARIES 44' TO 64' VARIES 45' TO 64' VARIES 11' TO 12'
WESTERN AVE TO DALTON AVE
NTS
DALTON AVE TO NORMANDIE AVE
NTS
ARTESIA BLVD EX
CF
EX
S'LY
RW
EX
CF
EX
N'LY
RW
EX CURB AND GUTTER EX CURB AND GUTTER
VARIES 3' TO 8' VARIES 65' TO 73' 72' VARIES 5' TO 25'
NORMANDIE TO VERMONT AVE
NTS
ARTESIA BLVD
ARTESIA BLVD
ARTESIA BLVD
17 17 *
* EX MEDIAN *
EX MEDIAN *
* EX MEDIAN
EX
CF
EX
S'LY
RW
EX
CF
EX
N'LY
RW
EX
CF
EX
S'LY
RW
EX
CF
EX
N'LY
RW
TYPICAL SECTION DETAIL
NTS
MODIFIED CITY OF GARDENA STD ST-18
NTS
8 17
17 17
17 *
*
ARTESIA BLVD
ARTESIA BLVD
11 4 3
*
11 4 3
*
11 4 3
*
* LOCATION PER PLAN
* LOCATION PER PLAN
* LOCATION PER PLAN
5 *
5 *
5 *
5 *
5 *
5 *
WIDTH PER PLAN
EXISTING AC FS SAWCUT
REMOVE 10" EXISTING
AC/AB/FABRIC &
CONSTRUCT 10" AC
BASE COURSE IN
MULTIPLE LIFTS SAWCUT1. SAWCUT EXISTING AC PAVEMENT
MINIMUM 1-1/2" DEEP.
2. EXCAVATE AND REMOVE EXISTING AC
PAVEMENT AND BASE MATERIAL TO 10"
BELOW EXISTING GRADE. COMPACT
TOP 1 FT OF SUBGRADE TO MINIMUM
95% RELATIVE COMPACTION.
3. CONSTRUCT 10" AC BASE COURSE AT
MINIMUM 95% RELATIVE COMPACTION.
NOTES
DIGOUT REPAIR AREA DETAIL
NTS
25 SAND COMPACTED TO 95% (SE>30) MIN.
MATCH EXIST STRUCTURAL SECTION
OR PLACE 11
2 SACK SLURRY MIX
GRIND 2" AC AND CONSTRUCT 2" AC
6"
TRENCH WIDTH
MIN.
6"
MIN.
12" 12" 12" 36" MIN.
4" TYP.
BOTH SIDES
2"
TYP.
MATCH STRUCTURAL SECTION PLUS 1"
1-1 1/2" PVC SCH. 40 SLEEVE FOR
IRRIGATION MAINLINE
2" PVC SCH. 40 SLEEVE
FOR CONTROL WIRES 1"
CONTACT
JOINT
4"
MIN.
TRENCH RESURFACING DETAIL
NTS
20 TRENCH RESURFACING IN ASPHALT CONCRETE PAVEMENT SHALL BE PER STANDARD SPECIFICATIONS SECTION 306-1.5, EXCEPT THAT:
(A) ASPHALT CONCRETE SHALL BE PLACED IN LIFTS NOT TO EXCEED 4" THICK. (B) APPLY TACK COAT TO SEAL THE CONTACT JOINT AND ADJACENT MILLED SURFACES TO BE OVERLAID.
NOTES
25 * 25*
25 *
17 17 *
*
VARIES 2' TO 16'
VARIES 2' TO 18'
VARIES 2' TO 27'
6 * 6*
6 * 6*
6 * 6*
5' VARIES 5' TO 22'
25 *
VARIES 5' TO 27'
25 *
VARIES 3' TO 25' VARIES 3' TO 12'
PROPOSED PAVEMENT
RECONSTRUCTION AT LEFT TURN POCKET
NTS
ARTESIA BLVD
STA 61+14 TO STA 62+04
STA 94+38 TO STA 96+41
ARTESIA BLVD
STA 83+78 TO STA 85+63
32 2 8-1059
6/5/2024 6/5/2024 6/5/2024 6/5/2024 6/5/2024
GARY SOLSONA RCE 68420
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
9' 53' 56' 10' 43' 47' 109'
CITY OF GARDENA
CITY OF TORRANCE
8 INTERSECTION
50+00 ARTESIA BLVD=
WESTERN AVE 50+30 BEGIN IMPROVEMENTS
CITY RIGHT OF WAY
CITY RIGHT
OF WAY
RAMP 51+37 57' 52+00 52+67 52+85 52+91 53+02 53+12 50+76 50+85 5' 52+12 52+23 6 6
6 14
17 17
25 25
25 25
27 10' 21' 10' 59' 10' 54' 68' 10' 44' 58' 36' 7' 122' 10' 54' 10' 44' 46' 48' 6' 36' 110' 56'
CITY RIGHT OF WAY
L=92'
8 8
SEE MEDIAN HARDSCAPE / LANDSCAPE
AND IRRIGATION DEMOLITION AND
IMPROVEMENTS PER SHEET 15 TO 47
(TYP)
2 EA
8 8
RAMP CITY RIGHT OF WAY W=25', X=4' ℄ DWY 56+29 56+02 56+53 57+58 57+5859+88 60+30 61+90 61+95 7 61+14 BEG TAPER JOIN EX CURB 62+04 JOIN EX CURB 2' 14' 5' 56+85 6 6
32 2
2 4 3
17 11 11 11 11
11 14 6 25
5 6
27 16
16 28
25 25
1 W=12' L=60'
31 17 10' 2'
14 PROTECT IN PLACE
REMOVE AND DISPOSE EXISTING ASPHALT PAVEMENT.
FOR INSTALLATION OF NEW TRAFFIC SIGNAL CONDUIT
PER TRAFFIC SIGNAL MODIFICATION PLANS. FURNISH
AND RECONSTRUCT FULL DEPTH ASPHALT PAVEMENT
PER CITY STD ST-20
2 REMOVE AND DISPOSE OF EXISTING PORTION OF MEDIAN.
FURNISH AND RECONSTRUCT MEDIAN CURB PER CITY
STD-7, DETAIL C-4, LENGTH PER PLAN
3 RECONSTRUCT AFFECTED PORTION OF
LANDSCAPE/HARDSCAPE/IRRIGATION WITHIN MEDIAN
PER LANDSCAPE PLANS
4 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER.
FURNISH AND RECONSTRUCT PCC CURB AND GUTTER OVER
6” CAB PER CITY OF GARDENA STD. ST-7, DETAIL C-1
5 REMOVE AND DISPOSE OF EXISTING SIDEWALK/ PAVEMENT.
FURNISH AND RECONSTRUCT 4” PCC OVER EXISTING
RECOMPACTED SUBGRADE AND/OR NEW SIDEWALK PER
CITY STD. ST-5B
6 REMOVE AND DISPOSE OF EXISTING CONCRETE DRIVEWAY.
FURNISH AND RECONSTRUCT CONCRETE DRIVEWAY PER
CITY STD ST-1-A
7 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP.
FURNISH AND RECONSTRUCT ACCESS RAMP PER MODIFIED
CITY STD. ST-18, DETAIL 8, SEE SHEET 2
8 SEE LANDSCAPE DEMOLITION PLANS FOR REMOVAL OF
EXISTING HARDSCAPE. PROTECT IN PLACE EXISTING MEDIAN
CURB.
11 STREET IMPROVEMENT NOTES STREET IMPROVEMENT NOTES STREET IMPROVEMENT NO SAWCUT AND REMOVE 10" THICK EXISTING AC/AB
16 ADJUST UTILITY VALVE TO GRADE (BY OTHERS)
COLDMILL PAVEMENT, 2" THICK, FULL DEPTH. REPAIR
ALL HOLES, SPALLS, JOINTS AND CRACK SEAL PER
TECHNICAL PROVISIONS. FURNISH AND CONSTRUCT 2"
THICK ARHM PG 64-16
17 SAWCUT AND REMOVE 10" THICK EXISTING AC/AB
PAVEMENT AND CONSTRUCT 10" THICK AC BASE
COURSE OVER COMPACTED NATIVE (95% RELATIVE
COMPACTION) PER DETAIL 25 ON SHEET 2
25 ADJUST MANHOLE FRAME AND COVER TO GRADE PER
CITY STD ST-9
27 28 ADJUST WATER VALVE TO GRADE
THICK ARHM PG 64-16
CONSTRUCT PCC MEDIAN CURB TAPER PER SPPWC STD
140-3, OFFSET "W" AND TAPER LENGTH "L" PER PLAN
31 REMOVE EXISTING AC/AB PAVEMENT AND NATIVE
MATERIAL AND CONSTRUCT 10" THICK AC BASE COURSE
OVER COMPACTED NATIVE (95% RELATIVE COMPACTION)
PER DETAIL 32 ON SHEET 2
32 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS DIRECTOR / CITY ENGINEER
DRAWN BY
AA/MC
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PLANS PREPARED BY:
GS
NP/KD
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
5/21/2024
5/21/2024
5/21/2024 47
E
GI N
L
S O
ION
FES
A
REE NIA
A IF OF C L
RO
N
P
E
IS
RET
D
ER
G
T
E AT
S
R
16842 Von Karman Avenue, Suite 150
Irvine, CA 92606 P 909.753.8111 F 909.753.0775 MATCH LINE 54+00 SEE BOTTOM LEFT MATCH LINE 54+00 SEE TOP RIGHT MATCH LINE 62+70 SEE SHEET 4 PUBLIC RIGHT OF WAY
LEGEND
RECONSTRUCT SIDEWALK
RECONSTRUCT CURB & GUTTER
RECONSTRUCT DRIVEWAY
CITY BOUNDARY
FULL-DEPTH PAVEMENT RECONSTRUCTION
STREET IMPROVEMENT PLAN
ARTESIA BOULEVARD
ARTESIA BOULEVARD WESTERN AVENUE GARDENA MARKET PLACE MAGNOLIA WAY
1. ALL CROSSWALKS, ARROWS, STOPBARS, AND LEGENDS SHALL BE THERMOPLASTIC MATERIAL.
2. RAISED PAVEMENT MARKERS SHALL BE CEMENTED TO THE PAVEMENT WITH HOT MELT BITUMINOUS ADHESIVE.
3. FURNISH AND INSTALL TEMPORARY MARKERS IMMEDIATELY AFTER PAVING, SPACED AT 25 ft MAXIMUM.
4. REMOVE ALL EXISTING PAVEMENT MARKINGS BY WET SANDBLASTING (CROSS WALKS, STOP LEGENDS, ETC.). EXISTING PAVEMENT MARKINGS AND STRIPINGS TO BE REMOVED ARE NOT SHOWN ON THE PLAN. FIELD VERIFY LOCATIONS.
5. REMOVE AND DISPOSE OF ALL EXISTING RAISED PAVEMENT MARKERS WITHIN THE PROJECT LIMITS. PAYMENT SHALL BE INCLUDED IN BID ITEM PRICE FOR FURNISH AND INSTALL PAVEMENT MARKERS.
6. ADJUST UTILITY VALVE COVERS, UTILITY BOXES, TRAFFIC SIGNAL BOXES, ETC. TO FINISH GRADE. PAYMENT SHALL BE INCLUDED IN ADJACENT CONSTRUCTION.
7. ALL SURVEY CENTERLINE TIES AND MONUMENTS THAT ARE DAMAGED OR REMOVED SHALL BE RE-ESTABLISHED. THE SURVEYOR SHALL ALSO ESTABLISH CENTER LINE MONUMENTS AND
TIES AT ALL STREET INTERSECTIONS WITHIN THE PROJECT LIMITS WHERE NONE EXISTED PRIOR TO CONSTRUCTION. SEE TECHNICAL PROVISIONS.
8. PROVIDE TRAFFIC CONTROL PER TECHNICAL PROVISIONS.
9. ALL STREETS ARE DRAWN WITH BREAK LINES FOR DRAWING PURPOSES. BIDS SHALL BE BASED ON STATIONING AND FIELD VERIFICATION.
10. 24 HOUR NOTICE FOR ALL INSPECTIONS REQUIRED.
11. CATCH BASINS NOT DRAWN FOR CLARITY.
12. CONTRACTORS SHALL REMOVE AND DISPOSE OF ALL TRASH AND BROKEN BRANCHES BEFORE AND AFTER PAVING.
13. PRIOR TO CUTTING OF ANY ROOTS, CALL PARKS DIVISION AT (310)217-9564 FOR APPROVAL.
14. PROTECT ALL STORM DRAINS, CATCH BASINS, ETC. WITH SAND BAGS, FABRIC AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES.
15. STREET CENTERLINE AS SHOWN ON PLAN IS APPROXIMATE.
16. PRIOR TO ANY WORK WITHIN UPRR R/W OR ANY WORK AFFECTING GRADE CROSSING
OPERATIONS, CALL UPRR MANAGER OF PUBLIC PROJECTS REPRESENTATIVE NICK VINEYARD AT (909)222-5659.
GENERAL NOTES:
COLDMILL PAVEMENT PER CONSTRUCTION
NOTE 17
3 6/5/2024
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
KEYMAP
SCALE: NTS
6/5/2024 6/5/2024 6/5/2024 6/5/2024
GARY SOLSONA RCE 68420
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
9 8 9 CITY RIGHT OF WAY CITY RIGHT OF WAY RAMP
W=12', X=4' ℄ DWY 74+55 7
74+37
70+46
70+78
74+57 5'
76+55
77+61
22'
77+77
27'
70+05 6 6 5 5 25 25 14 17 17 17 17 11 11 11 25 27 27 27 6 17 2'
2' 51'
5'
90'
57' 55'
12' 45' 44'
10'
36' 48'
112'
57' 54'
12' 45' 45' 57' 35' 36'
5'
10'
48' 37'
112'
VARIES CITY RIGHT OF WAY 8 9 PB PB SEE MEDIAN HARDSCAPE / LANDSCAPE AND IRRIGATION DEMOLITION AND IMPROVEMENTS PER SHEET 15 TO 47 SEE MEDIAN HARDSCAPE / LANDSCAPE AND IRRIGATION DEMOLITION AND IMPROVEMENTS PER SHEET 15 TO 47 (TYP) 8 (3) 30 RAMP RAMP CITY RIGHT OF WAY RAMP RAMP RAMP RAMP W=20', X=4' ℄
63+14
63+18
DWY 63+00 7
63+52
64+15
64+48
64+88 5'
62+98
63+04
10'
6'
63+83
63+88
W=12', X=4' ℄ DWY 64+95 7
6'
65+64
65+70
66+75
69+32
69+58
69+71
69+86
69+99 105 5 25 2 2 2 14 14 14 17 17 11 11 11 11 11 23 12 20 22 25 25 5 6 6 6 14 27 27 27 27 28 28 6 6 14 14 1 69+30 19
69+70 19
63+32
10'
17'
2' 4' (TYP.) 4' (TYP.) 14 PROTECT IN PLACE REMOVE AND DISPOSE EXISTING ASPHALT PAVEMENT. FOR INSTALLATION OF NEW TRAFFIC SIGNAL CONDUIT PER TRAFFIC SIGNAL MODIFICATION PLANS. FURNISH AND RECONSTRUCT FULL DEPTH ASPHALT PAVEMENT PER CITY STD ST-20 2 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER. FURNISH AND RECONSTRUCT PCC CURB AND GUTTER OVER 6” CAB PER CITY OF GARDENA STD. ST-7, DETAIL C-1 5 REMOVE AND DISPOSE OF EXISTING SIDEWALK/ PAVEMENT. FURNISH AND RECONSTRUCT 4” PCC OVER EXISTING RECOMPACTED SUBGRADE AND/OR NEW SIDEWALK PER CITY STD. ST-5B 6 REMOVE AND DISPOSE OF EXISTING CONCRETE DRIVEWAY. FURNISH AND RECONSTRUCT CONCRETE DRIVEWAY PER CITY STD ST-1-A 7 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER MODIFIED CITY STD. ST-18, DETAIL 8, SEE SHEET 2 8 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER SPPWC STD 111-5, CASE D TYPE 2 9 REMOVE AND DISPOSE OF EXISTING CROSS GUTTER PANEL. FURNISH AND RECONSTRUCT CROSS GUTTER PANEL PER CITY STD ST-3 10 SEE LANDSCAPE DEMOLITION PLANS FOR REMOVAL OF EXISTING HARDSCAPE. PROTECT IN PLACE EXISTING MEDIAN CURB. 1112 INSTALL 2" SCHEDULE 80 ELECTRICAL CONDUIT STREET IMPROVEMENT NOTES COLDMILL PAVEMENT, 2" THICK, FULL DEPTH. REPAIR ALL HOLES, SPALLS, JOINTS AND CRACK SEAL PER TECHNICAL PROVISIONS. FURNISH AND CONSTRUCT 2" THICK ARHM PG 64-16 17 REMOVE INTERFERING PORTIONS OF EXISTING SIDEWALK AND INSTALL 11"X17" PULLBOX (BROOKS NO. 36-PB SERIES WITH BOLT DOWN CONCRETE COVER, OR APPROVED EQUAL) 19 REMOVE, SALVAGE, AND REINSTALL SIGN AND POST IN SAME LOCATION 1 TRENCH AND INSTALL 2" PVC SCHEDULE 40 CONDUIT SLEEVE (FOR IRRIGATION) AND 1-1/2" PVC SCHEDULE 40 CONDUIT SLEEVE (FOR CONTROLLER WIRING). BACKFILL AND RESURFACE PAVEMENT PER TRENCH RESURFACING DETAIL 20 ON SHEET 2 20 INSTALL 20AMP CIRCUIT BREAKER IN EXISTING SERVICE CABINET 22 INSTALL 2#12, 1#12 GND CONDUCTORS FOR LANDSCAPING CONTROL IN TRAFFIC SIGNAL CONDUIT 23 SAWCUT AND REMOVE 10" THICK EXISTING AC/AB PAVEMENT AND CONSTRUCT 10" THICK AC BASE COURSE OVER COMPACTED NATIVE (95% RELATIVE COMPACTION) PER DETAIL 25 ON SHEET 2 25 ADJUST MANHOLE FRAME AND COVER TO GRADE PER CITY STD ST-9 2728 ADJUST WATER VALVE TO GRADE REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER CALTRANS STD A88A, CASE B 30 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION APPROVED BY : CITY OF GARDENA SHT. OF PUBLIC WORKS DIRECTOR / CITY ENGINEER DRAWN BY AA/MC CHECKED BY DEPARTMENT OF PUBLIC WORKS DESIGNED BY F. B. REF. LIMITS: PROJECT : NO. DWG. DATE: DATE UNDER THE SUPERVISION OF: PLANS PREPARED BY: GSNP/KD ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2 5/21/2024 5/21/2024 5/21/2024 47 E GI N L S O ION FES A REE NIA A IF OF C L RO N P E IS RET D ER G T E AT S R 16842 Von Karman Avenue, Suite 150 Irvine, CA 92606 P 909.753.8111 F 909.753.0775 MATCH LINE 70+00
SEE BOTTOM LEFT
SEE TOP RIGHT
MATCH LINE 70+00
SEE SHEET 5
MATCH LINE 78+60
SEE SHEET 3
MATCH LINE 62+70 ARTESIA SQUARE STREET IMPROVEMENT PLAN ARTESIA BOULEVARD ARTESIA BOULEVARD PRIVATE DWY
PRIVATE
ALLEY
DENKER
AVENUE
DALTON
AVENUE PUBLIC RIGHT OF WAY RECONSTRUCT SIDEWALK RECONSTRUCT CURB & GUTTER RECONSTRUCT DRIVEWAY CITY BOUNDARY FULL-DEPTH PAVEMENT RECONSTRUCTION 1. ALL CROSSWALKS, ARROWS, STOPBARS, AND LEGENDS SHALL BE THERMOPLASTIC MATERIAL. 2. RAISED PAVEMENT MARKERS SHALL BE CEMENTED TO THE PAVEMENT WITH HOT MELT BITUMINOUS ADHESIVE. 3. FURNISH AND INSTALL TEMPORARY MARKERS IMMEDIATELY AFTER PAVING, SPACED AT 25 ft MAXIMUM. 4. REMOVE ALL EXISTING PAVEMENT MARKINGS BY WET SANDBLASTING (CROSS WALKS, STOP LEGENDS, ETC.). EXISTING PAVEMENT MARKINGS AND STRIPINGS TO BE REMOVED ARE NOT SHOWN ON THE PLAN. FIELD VERIFY LOCATIONS. 5. REMOVE AND DISPOSE OF ALL EXISTING RAISED PAVEMENT MARKERS WITHIN THE PROJECT LIMITS. PAYMENT SHALL BE INCLUDED IN BID ITEM PRICE FOR FURNISH AND INSTALL PAVEMENT MARKERS. 6. ADJUST UTILITY VALVE COVERS, UTILITY BOXES, TRAFFIC SIGNAL BOXES, ETC. TO FINISH GRADE. PAYMENT SHALL BE INCLUDED IN ADJACENT CONSTRUCTION. 7. ALL SURVEY CENTERLINE TIES AND MONUMENTS THAT ARE DAMAGED OR REMOVED SHALL BE RE-ESTABLISHED. THE SURVEYOR SHALL ALSO ESTABLISH CENTER LINE MONUMENTS AND TIES AT ALL STREET INTERSECTIONS WITHIN THE PROJECT LIMITS WHERE NONE EXISTED PRIOR TO CONSTRUCTION. SEE TECHNICAL PROVISIONS. 8. PROVIDE TRAFFIC CONTROL PER TECHNICAL PROVISIONS. 9. ALL STREETS ARE DRAWN WITH BREAK LINES FOR DRAWING PURPOSES. BIDS SHALL BE BASED ON STATIONING AND FIELD VERIFICATION. 10. 24 HOUR NOTICE FOR ALL INSPECTIONS REQUIRED. 11. CATCH BASINS NOT DRAWN FOR CLARITY. 12. CONTRACTORS SHALL REMOVE AND DISPOSE OF ALL TRASH AND BROKEN BRANCHES BEFORE AND AFTER PAVING. 13. PRIOR TO CUTTING OF ANY ROOTS, CALL PARKS DIVISION AT (310)217-9564 FOR APPROVAL. 14. PROTECT ALL STORM DRAINS, CATCH BASINS, ETC. WITH SAND BAGS, FABRIC AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES. 15. STREET CENTERLINE AS SHOWN ON PLAN IS APPROXIMATE. 16. PRIOR TO ANY WORK WITHIN UPRR R/W OR ANY WORK AFFECTING GRADE CROSSING OPERATIONS, CALL UPRR MANAGER OF PUBLIC PROJECTS REPRESENTATIVE NICK VINEYARD AT (909)222-5659. GENERAL NOTES: COLDMILL PAVEMENT PER CONSTRUCTION NOTE 17 4 LEGEND SD W
WESTERN AVE
NORMANDIE AVE
VERMONT AVE KEYMAP SCALE: NTS 6/5/2024 6/5/2024 6/5/2024 6/5/2024 6/5/2024 GARY SOLSONA RCE 68420 SEE SHEET 1 FOR SIGNATURE SEE SHEET 1 FOR DATE 11'
8'
87' 73'
15' 72' 65'
52' 74'
161'
24'
75' 71'
11' 64' 64'
10' 54'
146' 79' 92' 60' UPRR RIGHT OF WAY CITY RIGHT OF WAY 8 13 8 13 9 9 9 CITY RIGHT OF WAY RAMP INTERSECTION 80+91.93 ARTESIA BLVD= NORMANDIE AVE 83+72
83+82
84+54
84+68
83+07
83+12
83+42
83+78
JOIN EX CURB
85+63
BEG TAPER
JOIN EX CURB
9'
3' 6 6 5 5 2 25 32 2 2 6 4 4 2 14 25 3 17 25 17 11 11 11 27 27 2725 W=6'
L=90' L=185' 3 31 33 2 33 33 17 17 17 17 25
2'
2'
2' 2'
37' JOIN EX.
41' JOIN EX. DOT # 760511G 12' 80+33 ~ 0" CF 2' 6 12' EX TRAFFIC SIGNAL CABINET 5' 2'4' 5' GRADE CROSSING 14 WARNING DEVICE AND FLASHERS EX CONCRETE PANELS AT RAILROAD CROSSING 14 GRADE CROSSING WARNING DEVICE AND FLASHERS 80+22 ~ 6" CF 185 END 4.5% MAX
80+02
JOIN EX. 5 BEG 66 2525 2' 2' 4' TYP.
5'
82' 77'
10' 69' 69'
5' 50'
158' 5' 9 8 9 9 9 9 SEE MEDIAN HARDSCAPE / LANDSCAPE AND IRRIGATION DEMOLITION AND IMPROVEMENTS PER SHEET 15 TO 47 (TYP) CITY RIGHT OF WAY 86+74
86+82
86+90
86+95
87+15
87+25
87+45
87+51
88+38
88+47
90+60
90+85
86+93
86+98
92+50
92+59 6 6 6 6 525 2 2 2 2 2 4 4 17 17 11 11 11 11 11 6 6 6 90+70
90+78
2' 14 PROTECT IN PLACE REMOVE AND DISPOSE EXISTING ASPHALT PAVEMENT. FOR INSTALLATION OF NEW TRAFFIC SIGNAL CONDUIT PER TRAFFIC SIGNAL MODIFICATION PLANS. FURNISH AND RECONSTRUCT FULL DEPTH ASPHALT PAVEMENT PER CITY STD ST-20 2 REMOVE AND DISPOSE OF EXISTING PORTION OF MEDIAN. FURNISH AND RECONSTRUCT MEDIAN CURB PER CITY STD-7, DETAIL C-4, LENGTH PER PLAN 3 RECONSTRUCT AFFECTED PORTION OF LANDSCAPE/HARDSCAPE/IRRIGATION WITHIN MEDIAN PER LANDSCAPE PLANS 4 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER. FURNISH AND RECONSTRUCT PCC CURB AND GUTTER OVER 6” CAB PER CITY OF GARDENA STD. ST-7, DETAIL C-1 5 REMOVE AND DISPOSE OF EXISTING SIDEWALK/ PAVEMENT. FURNISH AND RECONSTRUCT 4” PCC OVER EXISTING RECOMPACTED SUBGRADE AND/OR NEW SIDEWALK PER CITY STD. ST-5B 6 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER MODIFIED CITY STD. ST-18, DETAIL 8, SEE SHEET 2 8 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER SPPWC STD 111-5, CASE D TYPE 2 9 SEE LANDSCAPE DEMOLITION PLANS FOR REMOVAL OF EXISTING HARDSCAPE. PROTECT IN PLACE EXISTING MEDIAN CURB. 11 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT CURB RAMP PER MODIFIED SPPWC STD 111-5, CASE B, TYPE 2. MODIFICATION: BACK OF WALK PER PLAN 13 STREET IMPROVEMENT NOTESSTREET IMPROVEMENT NOTE SAWCUT AND REMOVE 10" THICK EXISTING AC/AB PAVEMENT AND CONSTRUCT 10" THICK AC BASE COURSE OVER COMPACTED NATIVE (95% RELATIVE COMPACTION) PER DETAIL 25 ON SHEET 2 25 ADJUST MANHOLE FRAME AND COVER TO GRADE PER CITY STD ST-9 27 COLDMILL PAVEMENT, 2" THICK, FULL DEPTH. REPAIR ALL HOLES, SPALLS, JOINTS AND CRACK SEAL PER TECHNICAL PROVISIONS. FURNISH AND CONSTRUCT 2" THICK ARHM PG 64-16 17 CONSTRUCT PCC MEDIAN CURB TAPER PER SPPWC STD 140-3, OFFSET "W" AND TAPER LENGTH "L" PER PLAN 31 REMOVE EXISTING AC/AB PAVEMENT AND NATIVE MATERIAL AND CONSTRUCT 10" THICK AC BASE COURSE OVER COMPACTED NATIVE (95% RELATIVE COMPACTION) PER DETAIL 32 ON SHEET 2 32 INSTALL DETECTABLE WARNING SURFACE ON EXISTING SIDEWALK (3' LONG AND FULL WIDTH OF SIDEWALK). COLOR AND TYPE OF DETECTABLE WARNING SURFACE SHALL COMPLY WITH CITY STD ST-18, NOTE 8 33 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER. CONSTRUCT VARIABLE HEIGHT PCC CURB AND GUTTER OVER 6" CAB PER MODIFIED CITY OF GARDENA STD. ST-7, DETAIL C-1. MODIFICATION: CONSTRUCT CURB HEIGHT TRANSITION FROM 0" CF TO 6" CF, AT 4.5% MAX GRADE 18 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION APPROVED BY : CITY OF GARDENA SHT. OF PUBLIC WORKS DIRECTOR / CITY ENGINEER DRAWN BY AA/MC CHECKED BY DEPARTMENT OF PUBLIC WORKS DESIGNED BY F. B. REF. LIMITS: PROJECT : NO. DWG. DATE: DATE UNDER THE SUPERVISION OF: PLANS PREPARED BY: GSNP/KD ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2 5/23/2024 5/23/2024 5/23/2024 47 E GI N L S O ION FES A REE NIA A IF OF C L RO N P E IS RET D ER G T E AT S R 16842 Von Karman Avenue, Suite 150 Irvine, CA 92606 P 909.753.8111 F 909.753.0775
SEE BOTTOM LEFT
MATCH LINE 86+00
MATCH LINE 86+00
SEE TOP RIGHT
MATCH LINE 94+00
SEE SHEET 6
MATCH LINE 78+60
SEE SHEET 4 ARTESIA BOULEVARD NORMANDIE
AVENUE ARTESIA BOULEVARD GATEWAY
GATEWAY PUBLIC RIGHT OF WAY LEGEND RECONSTRUCT SIDEWALK RECONSTRUCT CURB & GUTTER RECONSTRUCT DRIVEWAY CITY BOUNDARY FULL-DEPTH PAVEMENT RECONSTRUCTION 1. ALL CROSSWALKS, ARROWS, STOPBARS, AND LEGENDS SHALL BE THERMOPLASTIC MATERIAL. 2. RAISED PAVEMENT MARKERS SHALL BE CEMENTED TO THE PAVEMENT WITH HOT MELT BITUMINOUS ADHESIVE. 3. FURNISH AND INSTALL TEMPORARY MARKERS IMMEDIATELY AFTER PAVING, SPACED AT 25 ft MAXIMUM. 4. REMOVE ALL EXISTING PAVEMENT MARKINGS BY WET SANDBLASTING (CROSS WALKS, STOP LEGENDS, ETC.). EXISTING PAVEMENT MARKINGS AND STRIPINGS TO BE REMOVED ARE NOT SHOWN ON THE PLAN. FIELD VERIFY LOCATIONS. 5. REMOVE AND DISPOSE OF ALL EXISTING RAISED PAVEMENT MARKERS WITHIN THE PROJECT LIMITS. PAYMENT SHALL BE INCLUDED IN BID ITEM PRICE FOR FURNISH AND INSTALL PAVEMENT MARKERS. 6. ADJUST UTILITY VALVE COVERS, UTILITY BOXES, TRAFFIC SIGNAL BOXES, ETC. TO FINISH GRADE. PAYMENT SHALL BE INCLUDED IN ADJACENT CONSTRUCTION. 7. ALL SURVEY CENTERLINE TIES AND MONUMENTS THAT ARE DAMAGED OR REMOVED SHALL BE RE-ESTABLISHED. THE SURVEYOR SHALL ALSO ESTABLISH CENTER LINE MONUMENTS AND TIES AT ALL STREET INTERSECTIONS WITHIN THE PROJECT LIMITS WHERE NONE EXISTED PRIOR TO CONSTRUCTION. SEE TECHNICAL PROVISIONS. 8. PROVIDE TRAFFIC CONTROL PER TECHNICAL PROVISIONS. 9. ALL STREETS ARE DRAWN WITH BREAK LINES FOR DRAWING PURPOSES. BIDS SHALL BE BASED ON STATIONING AND FIELD VERIFICATION. 10. 24 HOUR NOTICE FOR ALL INSPECTIONS REQUIRED. 11. CATCH BASINS NOT DRAWN FOR CLARITY. 12. CONTRACTORS SHALL REMOVE AND DISPOSE OF ALL TRASH AND BROKEN BRANCHES BEFORE AND AFTER PAVING. 13. PRIOR TO CUTTING OF ANY ROOTS, CALL PARKS DIVISION AT (310)217-9564 FOR APPROVAL. 14. PROTECT ALL STORM DRAINS, CATCH BASINS, ETC. WITH SAND BAGS, FABRIC AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES. 15. STREET CENTERLINE AS SHOWN ON PLAN IS APPROXIMATE. 16. PRIOR TO ANY WORK WITHIN UPRR R/W OR ANY WORK AFFECTING GRADE CROSSING OPERATIONS, CALL UPRR MANAGER OF PUBLIC PROJECTS REPRESENTATIVE NICK VINEYARD AT (909)222-5659. GENERAL NOTES: CONSTRUCT PRECAST CONCRETE RAILROAD PANELS COLDMILL PAVEMENT PER CONSTRUCTION NOTE 17 5 STREET IMPROVEMENT PLAN SD W
WESTERN AVE
NORMANDIE AVE
VERMONT AVE KEYMAP SCALE: NTS 6/5/2024 6/5/2024 6/5/2024 6/5/2024 6/5/2024 GARY SOLSONA RCE 68420 SEE SHEET 1 FOR SIGNATURE SEE SHEET 1 FOR DATE 3' 97' 76'
25' 72'
73'
59' 27' 59'
173'
6'
77' 78'
5' 72' 72'
69' 16' 59'
155' CITY RIGHT OF WAY L= 203'
9 9
8 8 PBPB
M96+52 SEE SHEET 32 FOR NEW IRRIGATION MAINLINE EX IRRIGATION MAINLINE EX IRRIGATION MAINLINE SEE SHEET 33 FOR NEW IRRIGATION MAINLINE CITY RIGHT OF WAY 94+38
BEG TAPER
JOIN EX CURB
3'
96+41
JOIN EX CURB
12'
97+62
97+67
98+05
98+58
98+85
99+60
97+46
100+52
6 5 25
2 2
2 2
4 32
6 3 17 17 17 17 11 1220 24 22 25 29
96+13 19 21
W=9'
L=70' 31
24'
12'
12'
2' 25 25 CITY RIGHT OF WAY
9 9
9 9 SEE MEDIAN HARDSCAPE / LANDSCAPE AND IRRIGATION DEMOLITION AND IMPROVEMENTS PER SHEET 15 TO 47 (TYP) 4 EA (FOR CALTRANS OPERATED SIGNAL) 4 EA (FOR CALTRANS OPERATED SIGNAL) 30 30 CITY RIGHT OF WAY INTERSECTION 105+39.79 ARTESIA BLVD= VERMONT AVE
CITY OF GARDENA
CITY OF LOS ANGELES
105+35
END IMPROVEMENTS 105+44
END IMPROVEMENTS 17 17 26 26 15 REMOVE AND DISPOSE EXISTING ASPHALT PAVEMENT. FOR INSTALLATION OF NEW TRAFFIC SIGNAL CONDUIT PER TRAFFIC SIGNAL MODIFICATION PLANS. FURNISH AND RECONSTRUCT FULL DEPTH ASPHALT PAVEMENT PER CITY STD ST-20 2 REMOVE AND DISPOSE OF EXISTING PORTION OF MEDIAN. FURNISH AND RECONSTRUCT MEDIAN CURB PER CITY STD-7, DETAIL C-4, LENGTH PER PLAN 3 RECONSTRUCT AFFECTED PORTION OF LANDSCAPE/HARDSCAPE/IRRIGATION WITHIN MEDIAN PER LANDSCAPE PLANS4 REMOVE AND DISPOSE OF EXISTING CURB AND/OR GUTTER. FURNISH AND RECONSTRUCT PCC CURB AND GUTTER OVER 6” CAB PER CITY OF GARDENA STD. ST-7, DETAIL C-15 REMOVE AND DISPOSE OF EXISTING SIDEWALK/ PAVEMENT. FURNISH AND RECONSTRUCT 4” PCC OVER EXISTING RECOMPACTED SUBGRADE AND/OR NEW SIDEWALK PER CITY STD. ST-5B 6 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER MODIFIED CITY STD. ST-18, DETAIL 8, SEE SHEET 2 8 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER SPPWC STD 111-5, CASE D TYPE 29 SEE LANDSCAPE DEMOLITION PLANS FOR REMOVAL OF EXISTING HARDSCAPE. PROTECT IN PLACE EXISTING MEDIAN CURB. 11 STREET IMPROVEMENT NOTES COLDMILL PAVEMENT, 2" THICK, FULL DEPTH. REPAIR ALL HOLES, SPALLS, JOINTS AND CRACK SEAL PER TECHNICAL PROVISIONS. FURNISH AND CONSTRUCT 2" THICK ARHM PG 64-16 17 REMOVE INTERFERING PORTIONS OF EXISTING SIDEWALK AND INSTALL 11"X17" PULLBOX (BROOKS NO. 36-PB SERIES WITH BOLT DOWN CONCRETE COVER, OR APPROVED EQUAL) 19 ADJUST MANHOLE FRAME AND COVER TO GRADE PER CITY STD ST-9 (BY OTHERS) 1512 INSTALL 2" SCHEDULE 80 ELECTRICAL CONDUIT TRENCH AND INSTALL 2" PVC SCHEDULE 40 CONDUIT SLEEVE (FOR IRRIGATION) AND 1-1/2" PVC SCHEDULE 40 CONDUIT SLEEVE (FOR CONTROLLER WIRING). BACKFILL AND RESURFACE PAVEMENT PER TRENCH RESURFACING DETAIL 20 ON SHEET 2 20 FURNISH AND INSTALL 1-1/2" WATER METER WITH 2" SERVICE LINE PER GOLDEN STATE WATER COMPANY STD. DWG. NO. P-27 (400 SERIES HERSEY POSITIVE DISPLACEMENT WITH RAPID READ REGISTRATION) AND 1-1/2" REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY PER DETAIL B ON IRRIGATION DETAILS SHEET 34 21 INSTALL 20AMP CIRCUIT BREAKER IN EXISTING SERVICE CABINET 22 INSTALL 2"C-2#12, 1#12 GND CONDUCTORS FOR LANDSCAPING CONTROL 24 SAWCUT AND REMOVE 10" THICK EXISTING AC/AB PAVEMENT AND CONSTRUCT 10" THICK AC BASE COURSE OVER COMPACTED NATIVE (95% RELATIVE COMPACTION) PER DETAIL 25 ON SHEET 2 25 INSTALL LOOP DETECTOR PER CALTRANS STD ES-5A AND ES-5B. FOR THE (4) LEFT TURN LOOPS, USE (1) TYPE F LIMIT LINE LOOP AND (3) TYPE E LOOPS AS PER CURRENT CALTRANS STANDARD PLANS. FOR THE (4) ADVANCE LOOPS, USE (4) TYPE E LOOPS PER CURRENT CALTRANS STANDARD PLANS. 26 RELOCATE EXISTING TRAFFIC SIGNAL PULL BOX. SEE SHEET 11 FOR LOCATION OF NEW TRAFFIC SIGNAL PULL BOX 29 REMOVE AND DISPOSE OF EXISTING ACCESS RAMP. FURNISH AND RECONSTRUCT ACCESS RAMP PER CALTRANS STD A88A, CASE B 30 CONSTRUCT PCC MEDIAN CURB TAPER PER SPPWC STD 140-3, OFFSET "W" AND TAPER LENGTH "L" PER PLAN 31 REMOVE EXISTING AC/AB PAVEMENT AND NATIVE MATERIAL AND CONSTRUCT 10" THICK AC BASE COURSE OVER COMPACTED NATIVE (95% RELATIVE COMPACTION) PER DETAIL 32 ON SHEET 2 32 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION APPROVED BY : CITY OF GARDENA SHT. OF PUBLIC WORKS DIRECTOR / CITY ENGINEER DRAWN BY AA/MC CHECKED BY DEPARTMENT OF PUBLIC WORKS DESIGNED BY F. B. REF. LIMITS: PROJECT : NO. DWG. DATE: DATE UNDER THE SUPERVISION OF: PLANS PREPARED BY: GSNP/KD ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2 5/23/2024 5/23/2024 5/23/2024 47 E GI N
L
S
O
ION
FES
A
REE
NIA
A IF
OF C
L
RO
N
P
E
IS RET
D
ER G
T
E
AT
S
R
16842 Von Karman Avenue, Suite 150Irvine, CA 92606 P 909.753.8111 F 909.753.0775
SEE BOTTOM LEFT
MATCH LINE 101+50
MATCH LINE 101+50
SEE TOP RIGHT
MATCH LINE 94+00
SEE SHEET 5 ARTESIA BOULEVARD
VERMONT AVENUE
SHOPPING
CENTER
PRIVATE
DWY
PRIVATE
DWY
PRIVATE
DWY ARTESIA BOULEVARD PUBLIC RIGHT OF WAY LEGEND RECONSTRUCT SIDEWALK RECONSTRUCT CURB & GUTTER RECONSTRUCT DRIVEWAY CITY BOUNDARY FULL-DEPTH PAVEMENT RECONSTRUCTION 1. ALL CROSSWALKS, ARROWS, STOPBARS, AND LEGENDS SHALL BE THERMOPLASTIC MATERIAL. 2. RAISED PAVEMENT MARKERS SHALL BE CEMENTED TO THE PAVEMENT WITH HOT MELT BITUMINOUS ADHESIVE. 3. FURNISH AND INSTALL TEMPORARY MARKERS IMMEDIATELY AFTER PAVING, SPACED AT 25 ft MAXIMUM. 4. REMOVE ALL EXISTING PAVEMENT MARKINGS BY WET SANDBLASTING (CROSS WALKS, STOP LEGENDS, ETC.). EXISTING PAVEMENT MARKINGS AND STRIPINGS TO BE REMOVED ARE NOT SHOWN ON THE PLAN. FIELD VERIFY LOCATIONS. 5. REMOVE AND DISPOSE OF ALL EXISTING RAISED PAVEMENT MARKERS WITHIN THE PROJECT LIMITS. PAYMENT SHALL BE INCLUDED IN BID ITEM PRICE FOR FURNISH AND INSTALL PAVEMENT MARKERS. 6. ADJUST UTILITY VALVE COVERS, UTILITY BOXES, TRAFFIC SIGNAL BOXES, ETC. TO FINISH GRADE. PAYMENT SHALL BE INCLUDED IN ADJACENT CONSTRUCTION. 7. ALL SURVEY CENTERLINE TIES AND MONUMENTS THAT ARE DAMAGED OR REMOVED SHALL BE RE-ESTABLISHED. THE SURVEYOR SHALL ALSO ESTABLISH CENTER LINE MONUMENTS AND TIES AT ALL STREET INTERSECTIONS WITHIN THE PROJECT LIMITS WHERE NONE EXISTED PRIOR TO CONSTRUCTION. SEE TECHNICAL PROVISIONS. 8. PROVIDE TRAFFIC CONTROL PER TECHNICAL PROVISIONS. 9. ALL STREETS ARE DRAWN WITH BREAK LINES FOR DRAWING PURPOSES. BIDS SHALL BE BASED ON STATIONING AND FIELD VERIFICATION. 10. 24 HOUR NOTICE FOR ALL INSPECTIONS REQUIRED. 11. CATCH BASINS NOT DRAWN FOR CLARITY. 12. CONTRACTORS SHALL REMOVE AND DISPOSE OF ALL TRASH AND BROKEN BRANCHES BEFORE AND AFTER PAVING. 13. PRIOR TO CUTTING OF ANY ROOTS, CALL PARKS DIVISION AT (310)217-9564 FOR APPROVAL. 14. PROTECT ALL STORM DRAINS, CATCH BASINS, ETC. WITH SAND BAGS, FABRIC AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES. 15. STREET CENTERLINE AS SHOWN ON PLAN IS APPROXIMATE. 16. PRIOR TO ANY WORK WITHIN UPRR R/W OR ANY WORK AFFECTING GRADE CROSSING OPERATIONS, CALL UPRR MANAGER OF PUBLIC PROJECTS REPRESENTATIVE NICK VINEYARD AT (909)222-5659. GENERAL NOTES: COLDMILL PAVEMENT PER CONSTRUCTION NOTE 17 6 STREET IMPROVEMENT PLAN SD
W
WESTERN AVE
NORMANDIE AVE
VERMONT AVE KEYMAP SCALE: NTS 6/5/2024 6/5/2024 6/5/2024 6/5/2024 6/5/2024 GARY SOLSONA RCE 68420 SEE SHEET 1 FOR SIGNATURE SEE SHEET 1 FOR DATE TRAFFIC SIGNAL NOTES:
FURNISH AND INSTALL NEW BATTERY BACKUP SYSTEM COMPLETE IN NEW EXTERNAL BACKPACK CABINET.
REMOVE EXISTING 332 CABINET WITH CARE. RETURN CABINET AND ALL CONTENTS TO CITY TRAFFIC SIGNAL 1 GENERAL NOTES (THIS SHEET ONLY):
1. ALL EXISTING SIGNAL/PEDESTRIAN HEADS, AND PEDESTRIAN PUSH BUTTONS SHALL BE REMOVED AND SALVAGED.
CONTACT UPRR MANAGER OF PUBLIC PROJECTS PRIOR TO ANY WORK WITHIN UPRR ROW OR ANY WORK
FURNISH AND INSTALL NEW OPTICOM EMERGENCY VEHICLE PREEMPTION SENSOR ON TRAFFIC SIGNAL EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
FURNISH AND INSTALL NEW TYPE E LOOPS PER CITY OF GARDENA STANDARD DETAIL ST-24.
REMOVE AND SALVAGE EXISTING CONTROLLER FROM CABINET. FURNISH AND INSTALL NEW MODEL 2070 ATC CONTROLLER. FURNISH SPARE 2070 ATC CONTROLLER. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
FURNISH AND INSTALL NEW #6 PULL BOX.
4 5
6 7 ADJUST POSITION OF SIGNS TO INSTALL ACCESSIBLE PEDESTRIAN PUSH BUTTON ON POLE.
INSTALL CONDUIT INTO EXISTING PULL BOX.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
REMOVE AND SALVAGE EQUIPMENT.
EQUIPMENT OR MATERIAL TO BE REMOVED AND BECOME THE PROPERTY OF THE CONTRACTOR.
CB
BC
RS
RC
AB ABANDON. IF APPLIED TO CONDUIT, REMOVE CONDUCTORS.
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
M.A.G.
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PAUL FRISLIE RCE 72982
6/5/24
1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481
PLANS PREPARED BY:
M.A.G.
P.M.F.
6/5/24
6/5/24
TRAFFIC SIGNAL MODIFICATION PLAN
47 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
6-5-24
ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED: (E) = EXISTING CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATIONS.
PHASE DIAGRAM
Ø1 Ø2 Ø3 Ø4
Ø5 Ø6 Ø7 Ø8 ALL EQUIPMENT IS NEW UNLESS OTHERWISE NOTED: (E) = EXISTING, (R) = REMOVE L.E.D LUMINAIRE FIXTURE SHALL BE LEOTEK (EC3-10M-MV-NW-3-GY-700-WL) OR APPROVED BY CITY ENGINEER.
B -B
C
C
E
ECR -E BCR
POLE PLACEMENT
ARTESIA BOULEVARD GARDENA MARKET PLACE
Ø1
Ø1
Ø2
Ø2
Ø2P Ø2P
Ø6
Ø6
Ø6P
Ø6P
Ø8
Ø8
Ø4 Ø4
Ø4P
Ø4P
Ø5
Ø5
7 1
2 3
4 5
7 TYPE B
DETECTOR
LEAD-IN CABLE
#10 LUMINAIRE
TOTAL CABLES 3 CSC
OR CABLE TYPE
AWG SIZE, WIRE 12 CSC
1 Ø2, Ø4, Ø5, Ø2P, Ø2PPB
5 7
3 POLE CIRCUIT
CONDUCTOR SCHEDULE
CONDUIT RUN NUMBER
TOTAL
CONDUIT SIZES
TOTAL DLC
SIGNAL COMMON
Ø1, Ø6, Ø6P, Ø4PPB
Ø5, Ø6P
#12 I.I.S.N.S.
1 2 3 4 5 6 7 8
PERCENT FILL (%)
6 Ø1, Ø4, Ø2P, Ø4P, Ø2PPB, Ø4PPB
2 Ø8, Ø4P, Ø6PPB
Ø8
Ø5 DETECTOR LOOP
EVP CABLE
Ø6 DETECTOR LOOP
3"(E) 3"(E) 3" 3"(E) 4"
POLE SCHEDULE
SIGNAL MOUNTINGS
VEHICULAR M.A. (DOUBLE FACE)
LED TYPE "A" IISNS
POLE LOCATION
B C
GARDENA MARKET PL
POLE DATA
1 26-4-70(E)
NO. TYPE
L.E.D.LUMINAIRE
WATTS(EQ)
91 (E)
SIGNAL
M.A.
40' (E)
HEIGHT
30'
M.A.
12' (E) SV-1-T
PPB
PEDESTRIAN
2-MAS SP-1-T
3 5
7 E
6 2
Ø
4 2-3"(E)
Ø4 DETECTOR LOOP
Ø2 DETECTOR LOOP
Ø1 DETECTOR LOOP
1 2
3 4
5 6
8 3"
15TS (E) 30' - 12' (E) 139 (E) SV-1-T - SP-1-T 6 - 15TS 30' - 12' SV-1-T - - - - 15TS (E) 30' - 12' (E) SV-1-T - SP-1-T - - 15TS (E) 30' - 12' (E) SV-2-TA - SP-2-T 2/4 - 26-4-70 (E) 30' 40' (E) 12' (E) SV-2-TA 2-MAS SP-1-T 2 MARUKAI
CITY RIGHT OF WAY
5J1U
2I4U
2I4L
2I3L
2I2U
2I2L
2I3U
1I1U
6J4U
6J4L
6J3L
6J2U
6J2L
6J3U 4I6U 4I6L 8J6U
EXISTING TYPE III-BF
1 91
91 (E)
91 (E)
91 (E)
EX. 2"C, EX. 1-48SMFO TO
WESTERN AVE.
EX. 2"C, EX. 1-48SMFO EX. 2"C, EX. 1-48SMFO
EX. 3"C, EX. 2-48SMFO
EX. 1.5"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO
EX. 1.5"C, EX. 1-48SMFO
TO DALTON AVE.
EX. 2"C, 3DLC
EX. 2"C, 3DLC
EX. 2"C, 3DLC
EX. 2"C, 3DLC
285' TO
LIMIT LINE
285' TO
LIMIT LINE
- - -
- - - 8.5' - 4' - - -
- - -
- - -
1 1
1 1
- 1
- 1
1 2
2 1
6 7
1 1
1 1
- 1
- 1
1 2
2 1
6 7
1 1
1 1
- 1
-
-
-
-
-
- 3
3 1
1 1
1 -
-
-
-
-
-
-
- 2
2 1
1 -
-
-
-
-
-
-
-
-
- 1
1 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- 1
2 2
1 3
3 -
-
-
-
-
-
-
-
-
- 2
1 2
1 1 1 - 1 1 1 1 1
2 2 - 2 2 2 2 2
3 3 - 3 3 3 3 3
- 2 - 2 2 2 2 2
- - - - - - 1 1
3 3 3 3 3 3 6 6
- - - - 2 2 2 2
- - 1 1 1 1 1 1
- - - - - - 3 6
3 4 4 4 6 6 14 17
- 1 - 1 1 1 2 2
15 33 4 16 26 20 38 41
12-SMFO - - - - - - - 1 (E)
1-3"
1-3"(E)
CB
CB
RS POLE AND FOUNDATION
RC
CB
BC RC
BC RC
EX. SPLICE
ENCLOSURE
EX. 2"C, EX. 12-SMFO
4 4
4 PPB 5' - - - - - - 6 14' - 3' -
6 (4) 5
(2) 5
5 (10)
5 20 0 20 40
SCALE: 1"=20' MARUKAI
AB
4 Ø6PPB 1
- 1- 1-
-
-
-
-
-
-
-
-
-
-
AB
7 RS
Ø8 DETECTOR LOOP - 1 - - - - 1 1
POLE AND FOUNDATION
8 AB
8 PPB (R) 5' - - - - - - 4 (R) - - - -
6 EXISTING TYPE 332 CABINET
7 BC
7 7
(3) 5
5 (3)
(10)
TRAFFIC SIGNAL MODIFICATION PLAN
ARTESIA BLVD AT GARDEN MARKET PLACE
5-2597
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
TRAFFIC SIGNAL NOTES:
FURNISH AND INSTALL NEW BATTERY BACKUP SYSTEM COMPLETE IN NEW EXTERNAL BACKPACK CABINET.
REMOVE EXISTING 332 CABINET WITH CARE. RETURN CABINET AND ALL CONTENTS TO CITY TRAFFIC SIGNAL DIVISION. REMOVE AND DISPOSE OF CABINET FOUNDATION COMPLETE. FURNISH AND INSTALL NEW TYPE 332 CABINET ON NEW FOUNDATION WITH NEW MODEL 2070 ATC CONTROLLER. FURNISH SPARE 2070 ATC CONTROLLER. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
REMOVE EXISTING TRAFFIC SIGNAL CABINET AND TEMPORARILY INSTALL TO MAINTAIN SIGNAL OPERATION. 1 2
GENERAL NOTES (THIS SHEET ONLY):
1. ALL EXISTING SIGNAL/PEDESTRIAN HEADS, AND PEDESTRIAN PUSH BUTTONS SHALL BE REMOVED AND SALVAGED.
CONTACT UPRR MANAGER OF PUBLIC PROJECTS PRIOR TO ANY WORK WITHIN UPRR ROW OR ANY WORK
FURNISH AND INSTALL NEW OPTICOM EMERGENCY VEHICLE PREEMPTION SENSOR ON TRAFFIC SIGNAL EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
FURNISH AND INSTALL NEW TYPE E LOOPS PER CITY OF GARDENA STANDARD DETAIL ST-24.
REMOVE AND SALVAGE EXISTING CONTROLLER FROM CABINET. FURNISH AND INSTALL NEW MODEL 2070 ATC 4 5 EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
FURNISH AND INSTALL NEW #6 PULL BOX.
FURNISH AND INSTALL NEW #6E PULL BOX.
7 8
RC EQUIPMENT OR MATERIAL TO BE REMOVED AND BECOME THE PROPERTY OF THE CONTRACTOR.
UPDATE VIDEO DETECTION ZONES BASED ON NEW STRIPING.
REMOVE AND SALVAGE EXISTING PEDESTRIAN PUSH BUTTON AND PLUG HOLE.
ADJUST POSITION OF SIGNS TO INSTALL ACCESSIBLE PEDESTRIAN PUSH BUTTON ON POLE. 10 AB ABANDON. IF APPLIED TO CONDUIT, REMOVE CONDUCTORS.
ADJUST POSITION OF SIGNS TO INSTALL ACCESSIBLE PEDESTRIAN PUSH BUTTON ON POLE.
INSTALL CONDUIT INTO EXISTING PULL BOX.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
CB
BC
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
M.A.G.
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PAUL FRISLIE RCE 72982
6/5/24
1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481
PLANS PREPARED BY:
M.A.G.
P.M.F.
6/5/24
6/5/24
TRAFFIC SIGNAL MODIFICATION PLAN
47 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
6-5-24
ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED: (E) = EXISTING CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATIONS.
PHASE DIAGRAM
Ø1 Ø2 Ø3 Ø4
Ø5 Ø6 Ø7 Ø8
B -B
C
C
E
ECR -E BCR
POLE PLACEMENT DALTON AVENUE
20 0 20 40
SCALE: 1"=20'
Ø1
Ø1
Ø5
Ø5
Ø2
Ø2
Ø4 Ø4
Ø6
Ø6
Ø6
Ø2
Ø8 Ø8
Ø2P
Ø2P
Ø4P
Ø4P
Ø6P
Ø6P
Ø8P
Ø8P
8 POLE SCHEDULE
SIGNAL MOUNTINGS
VEHICULAR M.A. (DOUBLE FACE)
LED TYPE "A" IISNS
POLE LOCATION
B C
POLE DATA
1 NO. TYPE
L.E.D.LUMINAIRE
WATTS(EQ)
SIGNAL
M.A. HEIGHT M.A.
PPB
PEDESTRIAN
3 4
6 E
5 2
Ø
8 7
1 2
3 4
5 6
7 8
9 TYPE B
DETECTOR
LEAD-IN CABLE
Ø8 DETECTOR LOOP
#10 LUMINAIRE
TOTAL CABLES 3 CSC
OR CABLE TYPE
AWG SIZE, WIRE 12 CSC
1 Ø2, Ø5, Ø2P, Ø2PPB, Ø8PPB
4 6
3 POLE CIRCUIT
CONDUCTOR SCHEDULE
CONDUIT RUN NUMBER
TOTAL
CONDUIT SIZES
TOTAL DLC
SIGNAL COMMON
Ø1, Ø6, Ø6P, Ø4PPB
Ø5, Ø6P, Ø8PPB
#12 I.I.S.N.S.
1 2 3 4 5 6 7 8
PERCENT FILL (%)
5 Ø4, Ø8P
2 Ø8, Ø4P, Ø6PPB
Ø8, Ø8P, Ø6PPB
Ø5 DETECTOR LOOP
48-SMFO
Ø6 DETECTOR LOOP
9 Ø4 DETECTOR LOOP
Ø2 DETECTOR LOOP
Ø1 DETECTOR LOOP
8 Ø1, Ø2P, Ø2PPB, Ø4PPB
7 Ø4, Ø4P
3"(E) 3"(E) 3"(E) 2-4" 3"(E) 3"(E) 4"
1 2
3 4
5 6
7 8
1-A (E) 10' - - - TV-1-T - SP-1-T 6 -
-
29-5-100 (E) 30' 45' (E) 12' (E) 91 (E) SV-1-T 3-MAS SP-1-T 4 15TS (E) 30' - 8' (E) 91 (E) SV-1-T - SP-1-T 6
15TS (E) 30' - 12' (E) 91 (E) SV-1-T - SP-1-T 8
1-A (E) 10' - - - TV-1-T - SP-1-T - 29-5-100(E) 30' 45' (E) 12' (E) SV-1-T 3-MAS SP-1-T 2,8 15TS (E) 30' - 8' (E) SV-1-T - SP-1-T - 15TS (E) 30' - 12' (E) SV-1-T - SP-1-T 2,4 - DALTON AVE
- DALTON AVE
-
- ALL EQUIPMENT IS NEW UNLESS OTHERWISE NOTED: (E) = EXISTING 91 (E)
91 (E)
91 (E)
5J1U
2I2U
2I2L
2I3U
2I4U
2I4L
2I3L
1I1U
6J4U
6J4L
6J3L
6J2U
6J2L
6J3U 4I6U 8J6U 8J6L
EX. 1.5"C, EX. 1-48SMFO
TO GARDEN MARKET PL.
EX. 2"C, 3DLC
EX. 1.5"C, EX. 1-48SMFO
CITY RIGHT OF WAY
EX. 2"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO TO
NORMANDIE AVE.
EX. 2"C, 3DLC
1 2
285' TO
LIMIT LINE
285' TO
LIMIT LINE
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - 1
1 1
1 1
1 1
1 2
1 - 1
- 1
-
- 1
1 1
1 1
1 -
-
-
-
-
-
-
-
-
- 1
1 1
1 -
-
-
-
-
-
-
-
-
-
-
- 1
1 -
-
-
-
-
-
-
-
-
-
-
-
-
- 2
1 - 1
- 1
-
-
-
-
-
-
-
- 2
1 - 1
- 1
-
-
-
-
-
-
-
- 2
1 - 1
-
-
-
-
-
-
-
-
-
- 2
1 -
-
-
-
1 1
1 1
1 1
1 1
2 1
- 1
- 1
2 1 --
-
-
-
- 21 --
-
-
-
- 21
8 8 33 22 11 44 23 22 21 88
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 - - - 2 2
- - - - 1 1 1 1 1
- - - 6 - - - 6 6
- - - - - - 1 1 1
- - - 1 - - - 1 1
- - - - 6 6 6 6 6
- 2 2 2 - - - 2 2
- 2 2 9 7 7 8 17 17
- - - 2 (E) - - - - - 14 22 29 15 17 26 21 24 22
12-SMFO - - - - - - - 1 (E) 1 (E)
CCTV CABLE - - - - - - - 1 (E) 1 (E)
EVP CABLE 1 1 1 1 - - - 2 2
2-4"
2-2"
2-4"
1-2"
CB
4 4
BC
5 (4)
5 (10)
(2) 5
(10) 5
ARTESIA BOULEVARD
EX. 3"C, EX. 1-12SMFO,
EX. 2-48SMFO
EX. SPLICE
ENCLOSURE
EXISTING TYPE III-BF AB
7 RC
8 RC BC 7 RC BC
5 (3)
(3) 5
CB
7 NEW 2"C, 3DLC
EX. 2"C, 3DLC
10 10
EX. 2"C, 3DLC DENKER AVENUE
TRAFFIC SIGNAL MODIFICATION PLAN
ARTESIA BLVD AT DALTON AVENUE
5-2597
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
TRAFFIC SIGNAL NOTES:
FURNISH AND INSTALL NEW BATTERY BACKUP SYSTEM COMPLETE IN NEW EXTERNAL BACKPACK CABINET.
REMOVE EXISTING 332 CABINET WITH CARE. RETURN CABINET AND ALL CONTENTS TO CITY TRAFFIC SIGNAL 1 REMOVE EXISTING TRAFFIC SIGNAL CABINET AND TEMPORARILY INSTALL TO MAINTAIN SIGNAL OPERATION.
REMOVE EXISTING FOUNDATION AND INSTALL NEW FOUNDATION WITH NOTED CONDUIT SIZES. REINSTALL EXISTING TRAFFIC SIGNAL CABINET.
FURNISH AND INSTALL NEW OPTICOM EMERGENCY VEHICLE PREEMPTION SENSOR ON TRAFFIC SIGNAL EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
FURNISH AND INSTALL NEW TYPE E LOOPS PER CITY OF GARDENA STANDARD DETAIL ST-24.
REMOVE AND SALVAGE EXISTING CONTROLLER FROM CABINET. FURNISH AND INSTALL NEW MODEL 2070 ATC 3 4
5 GENERAL NOTES (THIS SHEET ONLY):
1. ALL EXISTING SIGNAL/PEDESTRIAN HEADS, AND PEDESTRIAN PUSH BUTTONS SHALL BE REMOVED AND SALVAGED.
CONTACT UPRR MANAGER OF PUBLIC PROJECTS PRIOR TO ANY WORK WITHIN UPRR ROW OR ANY WORK AFFECTING GRADE CROSSING OPERATIONS.
2. ADJUST POSITION OF SIGNS TO INSTALL ACCESSIBLE PEDESTRIAN PUSH BUTTON ON POLE.
INSTALL CONDUIT INTO EXISTING PULL BOX.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
REMOVE AND SALVAGE EQUIPMENT.
EQUIPMENT OR MATERIAL TO BE REMOVED AND BECOME THE PROPERTY OF THE CONTRACTOR.
RELOCATE EQUIPMENT.
CONNECT NEW AND EXISTING CONDUIT. REMOVE EXISTING CONDUCTORS AND INSTALL CONDUCTORS AS INDICATED.
ABANDON. IF APPLIED TO CONDUIT, REMOVE CONDUCTORS.
CB
BC
RS
RC
RL
CC
AB
FURNISH AND INSTALL NEW CONDUIT VIA HAND DIGGING BETWEEN PULL BOX AND RAILROAD SIGNAL CASE.
FURNISH AND INSTALL NEW 1-3" LB RIGID THREADED TYPE CONDUIT BODY TO ENTER THE RAILROAD SIGNAL CABINET. INSTALL RAILROAD PREEMPTION CABLE IN LB RIGID THREADED TYPE CONDUIT.
DISCONNECT EXISTING RAILROAD PREEMPTION CABLES. TERMINATE NEW RAILROAD SIGNAL INTERCONNECT CABLE IN TRAFFIC SIGNAL CABINET WITH SAME WIRING AS BEFORE (POWER FROM FROM T1 #6, BACK FROM RAILROAD TO TB9 #11). ONLY DC VOLTAGE SHALL BE USED FOR TRAFFIC SIGNAL PREEMPTION.
PROVIDE AN UPDATED INTERCONNECTED WARNING LABEL IN TRAFFIC SIGNAL CABINET WITH UP-TO-DATE HIGHWAY AND RAILROAD MAINTENANCE CONTACT INFORMATION.
FURNISH AND INSTALL TYPE R3-1 BLANK-OUT SIGN ON SIGNAL POLE. FURNISH AND INSTALL ALL WIRING BACK TO THE SIGNAL CABINET INCLUDING A NEW LOAD SWITCH. PROPER CONNECTIONS SHALL BE MADE TO ACTIVATE DURING RAILROAD PREEMPTION.
DETACH EXISTING RAILROAD PREEMPTION IN EXISTING RAILROAD SIGNAL CASE. TERMINATE NEW RAILROAD SIGNAL INTERCONNECT IN EXISTING RAILROAD SIGNAL CASE.
REMOVE AND SALVAGE EXISTING CONTROLLER FROM CABINET. FURNISH AND INSTALL NEW MODEL 2070 ATC CONTROLLER WITH OMNI FIRMWARE. FURNISH AND INSTALL NEW RAILROAD DC ISOLATER. FURNISH SPARE 2070 ATC CONTROLLER. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
12 13
14 15
16 17
18 EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
FURNISH AND INSTALL NEW #6 PULL BOX.
FURNISH AND INSTALL NEW #6E PULL BOX.
UPDATE VIDEO DETECTION ZONES BASED ON NEW STRIPING.
7 8
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
M.A.G.
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PAUL FRISLIE RCE 72982
6/5/24
1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481
PLANS PREPARED BY:
M.A.G.
P.M.F.
6/5/24
6/5/24
TRAFFIC SIGNAL MODIFICATION PLAN
47 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
6-5-24
PHASE DIAGRAM
Ø1 Ø2 Ø3 Ø4
Ø5 Ø6 Ø7 Ø8
B -B
C
C
E
ECR -E BCR
POLE PLACEMENT
ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED: (E) = EXISTING CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATIONS. NORMANDIE AVENUE Ø7
Ø8
Ø7
Ø6
Ø6
Ø6
Ø4
Ø4
Ø4
Ø2
Ø2
Ø2
Ø2
Ø1
Ø1
9 TYPE B
DETECTOR
LEAD-IN CABLE Ø6 DETECTOR LOOP
#10 LUMINAIRE
TOTAL CABLES 3 CSC
OR CABLE TYPE
AWG SIZE, WIRE 12 CSC
1 Ø2, Ø2P, Ø8PPB
4 6
10 3
POLE CIRCUIT
CONDUCTOR SCHEDULE
CONDUIT RUN NUMBER
TOTAL
CONDUIT SIZES
TOTAL DLC
Ø1
SIGNAL COMMON
Ø3, Ø4, Ø6P, Ø6PPB
Ø1, Ø5
#12 I.I.S.N.S.
1 2 3 4 5 6 7 8
PERCENT FILL (%)
5 Ø7, Ø8, Ø8P, Ø2PPB
2 Ø3, Ø8, Ø8P, Ø6PPB
Ø5, Ø6, Ø6P Ø8PPB
Ø4 DETECTOR LOOP
12-SMFO
Ø5 DETECTOR LOOP
3"(E) 2"(E) 3"(E) 4" 2-4" 3"
POLE SCHEDULE
SIGNAL MOUNTINGS
VEHICULAR M.A. (DOUBLE FACE)
LED TYPE "A" IISNS POLE LOCATION
B C
NORMANDIE AVE
POLE DATA
1 NO. TYPE
L.E.D.LUMINAIRE
WATTS(EQ)
SIGNAL
M.A. HEIGHT M.A.
PPB
PEDESTRIAN
3 4
-
6 10
NORMANDIE AVE
E
5 2 ARTESIA BLVD
- Ø
4"
9 Ø3 DETECTOR LOOP
Ø2 DETECTOR LOOP
Ø1 DETECTOR LOOP
9 Ø5
8 Ø1, Ø2
7 Ø4, Ø7, Ø2P, Ø2PPB
9 - 8 - 7 ARTESIA BLVD
-
1 2 3
4 5
6 7
8 9
1 2
3 4
6 5
8 9
10 61-5-129 (E) 30' 60' (E) 15' (E) 139 (E) SV-2-TA 2-MAS SP-1-T 26-4-70 (E) 30' 45' (E) 12' (E) 139 (E) SV-1-T 2-MAS SP-1-T 15TS (E) 30' - 12' (E) SV-2-TA - SP-1-T
33 17' 10' - - SV-1-T/SV-1 MAS - - 26-4-70 (E) 30' 40' (E) 15' (E) SV-1-T 2-MAS SP-1-T 1-A 10' - - - TV-2-T - SP-1-T - 26A-4-100 35' 40' 15' SV-1-T 2-MAS SP-1-T 15TS 30' - 12' SV-2-TA - - 1-A (E) 8' - - - SV-1 - - 33 (E) 17' 10' (E) - - SV-1-T MAS - Ø5
Ø5
Ø5
Ø2P
Ø8P
Ø2P
Ø6P
Ø3
Ø6P
ALL EQUIPMENT IS NEW UNLESS OTHERWISE NOTED: (E) = EXISTING L.E.D LUMINAIRE FIXTURE SHALL BE LEOTEK (EC3-10M-MV-NW-3-GY-700-WL) OR APPROVED BY CITY ENGINEER.
CITY RIGHT OF WAY
5J1U
2I2U
2I2L
2I3U 2I4U
2I3L 2I4L
5J1L
2I5U
2I5L
1I1U
6J5U
6J5L
6J3L
6J2U
6J2L
6J3U
1I1L
6J4U
6J4L 3I5U 3I5L 8J6U 8J6L 8J7U 8J7L 8J8U 7J5L 7J5U 4I6U 4I6U 4I7L 4I7U 6 6
8 -8
2 2
-
-
-
EX. 1.5"C, EX. 1-48SMFO
TO DALTON AVE.
EX. 2"C, 4DLC EX. 2"C, 4DLC
EX. 1.5"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO
EX. 2"C, EX. 1-12SMFO
EX. 2"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO
TO GATEWAY
EX. 2"C, 4DLC
EX. 2"C, 4DLC
EX. 2"C, 3DLC
EX. 2"C, 3DLC
139 (E)
139 (E)
139
139
1 EXISTING TYPE 332 CABINET
285' TO
LIMIT LINE
285' TO
LIMIT LINE
Ø1
Ø8P
- - -
- - -
- -18' 2.5'
6.5' - 4.5' - 12' 5.5' - - -
- - -
- - -
- - -
- - -
6.5'
Ø7 DETECTOR LOOP
Ø8 DETECTOR LOOP
Ø8
1 1
1 1
1 1
- 1
-
- 1
1 1
1 -
- 1
1 1
1 - 1
-
-
-
-
-
-
-
- 1
1 1
1 -
-
-
-
-
-
-
-
1 1
-
-
-
-
-
-
-
-
-
- 1
1 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 1
-
-
-
-
-
-
-
-
-
-
-
-
1 1
1 1
1 1
- 1
1 1
1 1
1 1
- 1 -
-
-
-
- 1 - 1 -
-
-
-
-
-
- 1
- 1 -
-
-
-
- 1 - 1 - 1 -
-
-
-
- 1
- 1 -
-
-
-
- 1 - 1 - 1 - 1 -
-
- 1
5 9 23 22 25 - 3 - 2 - 1 11 610
1 1 1 1 1 1 1 1 1
2 - - 2 2 2 2 2 2
3 1 1 3 3 3 3 3 3
2 - - - 2 2 2 2 2
- - - - - - 2 2 2
- - 8 8 8 - - 8 8
- - - - - - - 2 2
4 - - - 4 - - 4 4
- - 2 2 2 - - 2 2
- - - - - - 8 8 8
2 - - - 2 - - 2 2
- - - - - - - 5 5
6 10 10 16 10 33 33
- - - - - - - - 1 (E)
20 16 26 20 20 19 21 30 30
CCTV CABLE - - - - 1 (E) - - 1 (E) 1 (E)
EVP CABLE 1 - - - 3 - - 3 4
3 2-4"
2-2"
2-4"
1-2"
PROTECT EXISTING FIBER
SPLICE IN-PLACE
R73-3 (CA)
R73-6 (CA)
Ø5
Ø1
RC
RC
RC
CB
RC RL
TO FROM
EX. EVP
4 4
POLE AND FOUNDATION RS
RS POLE AND FOUNDATION
20 0 20 40
SCALE: 1"=20'
(4) 5
5 (16)
(16) 5
ARTESIA BOULEVARD
RS POLE AND FOUNDATION
POLE AND FOUNDATION RS
CC
RL
FROM
TO
EX. CCTV
AB
AB
AB
CB
RC
18 8 BC
CB
10 10
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-2
-
-
-
-5
7 -5
-
-2"
AB
7 AB
7 CC
7 7
2"C, 4DLC
5 (4)
5 (12)
(10) 5
TRAFFIC SIGNAL MODIFICATION PLAN
ARTESIA BLVD AT NORMANDIE AVENUE
Ø3
(PV)
Ø8
(PV)
Ø2+Ø5 Ø4+Ø7 Ø4+Ø8 Ø1
RAILROAD PRE-EMPTION OPERATION
3 CSC RAILROAD PREEMPTION - - 1 1 1 - - 1 1 - 10 -
11 11
-
-
-
-
-
-
-
-
-
-
-
-
-1
-
-
-3"
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 LIMITED SERVICE OPERATION
TRACK
CLEARANCE
1. UPON ACTUATION OF RAILROAD PRE-EMPTION, SIGNAL SHALL TERMINATE ANY PHASE EXCEPT FOR THE RAILROAD CLEARANCE PHASES OF 2 AND 5.
2. RAILROAD CLEARANCE PHASES OF 2 AND 5 DISPLAY GREEN FOR 10 SECONDS.
3. LIMITED SERVICE PHASES OF 1, 4, 7, 8 SHALL OPERATE IN THE ORDER SHOWN ABOVE UNTIL END OF PRE-EMPTION.
UPRR RAILROAD
SIGNAL CASE
12 EX. 2"C, 2DLC
13 14 15
60' UPRR RIGHT OF WAY
CITY RIGHT
OF WAY
UPRR RIGHT OF WAY
UPRR RIGHT OF WAY
5 CSC LED BLANK OUT SIGN 1
17 - - - 2 - - 2 2 - -
16 16
DETAIL "A"
SCALE: 1"=10'
7 4 AB
1 AB
5 RC
AB
GRADE CROSSING
DOT #760511G
11 CB
7 5-2597
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
GENERAL NOTES (THIS SHEET ONLY):
1. ALL EXISTING SIGNAL/PEDESTRIAN HEADS, AND PEDESTRIAN PUSH BUTTONS SHALL BE REMOVED AND SALVAGED.
CONTACT UPRR MANAGER OF PUBLIC PROJECTS PRIOR TO ANY WORK WITHIN UPRR ROW OR ANY WORK
FURNISH AND INSTALL NEW OPTICOM EMERGENCY VEHICLE PREEMPTION SENSOR ON TRAFFIC SIGNAL EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
FURNISH AND INSTALL NEW TYPE E LOOPS PER CITY OF GARDENA STANDARD DETAIL ST-24.
REMOVE AND SALVAGE EXISTING CONTROLLER FROM CABINET. FURNISH AND INSTALL NEW MODEL 2070 ATC CONTROLLER. FURNISH SPARE 2070 ATC CONTROLLER. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
FURNISH AND INSTALL NEW #6 PULL BOX.
FURNISH AND INSTALL NEW #6E PULL BOX.
4 5
6 7
8 TRAFFIC SIGNAL NOTES:
FURNISH AND INSTALL NEW BATTERY BACKUP SYSTEM COMPLETE IN NEW EXTERNAL BACKPACK CABINET.
REMOVE EXISTING 332 CABINET WITH CARE. RETURN CABINET AND ALL CONTENTS TO CITY TRAFFIC SIGNAL 1 UPDATE VIDEO DETECTION ZONES BASED ON NEW STRIPING.
REMOVE AND SALVAGE EXISTING PEDESTRIAN PUSH BUTTON AND PLUG HOLE.
ADJUST POSITION OF SIGNS TO INSTALL ACCESSIBLE PEDESTRIAN PUSH BUTTON ON POLE.
INSTALL CONDUIT INTO EXISTING PULL BOX.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
REMOVE AND SALVAGE EQUIPMENT.
EQUIPMENT OR MATERIAL TO BE REMOVED AND BECOME THE PROPERTY OF THE CONTRACTOR.
CB
BC
RS
RC
10 11
CONNECT NEW AND EXISTING CONDUIT. REMOVE EXISTING CONDUCTORS AND INSTALL CONDUCTORS AS INDICATED.
ABANDON. IF APPLIED TO CONDUIT, REMOVE CONDUCTORS.
CC
AB
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
M.A.G.
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PAUL FRISLIE RCE 72982
6/5/24
1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481
PLANS PREPARED BY:
M.A.G.
P.M.F.
6/5/24
6/5/24
TRAFFIC SIGNAL MODIFICATION PLAN
47 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
6-5-24
PHASE DIAGRAM
Ø1 Ø2 Ø3 Ø4
Ø5 Ø6 Ø7 Ø8
B -B
C
C
E
ECR -E BCR
POLE PLACEMENT GATEWAY
1 2
3 5
4 6
7 8
9 10
11 TYPE B
DETECTOR
LEAD-IN CABLE
Ø7 DETECTOR LOOP
#10 LUMINAIRE
TOTAL CABLES 3 CSC
OR CABLE TYPE
AWG SIZE, WIRE 12 CSC
1 Ø1, Ø5
4 6
3 POLE CIRCUIT
CONDUCTOR SCHEDULE
CONDUIT RUN NUMBER
TOTAL
CONDUIT SIZES
TOTAL DLC
SIGNAL COMMON
Ø1, Ø6, Ø6P, Ø6PPB
Ø3, Ø5, Ø6P
ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED: (E) = EXISTING CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATIONS. #12 I.I.S.N.S.
1 2 3 4 5 6 7 8
PERCENT FILL (%)
5 Ø2, Ø2P, Ø2PPB
2 Ø3, Ø7
Ø3, Ø6PPB
Ø5 DETECTOR LOOP
12-SMFO
Ø6 DETECTOR LOOP
3"(E) 3"(E) 2" 4" 2" 2"(E) 3"
POLE SCHEDULE
SIGNAL MOUNTINGS
VEHICULAR M.A. (DOUBLE FACE)
LED TYPE "A" IISNS
POLE LOCATION
-B C
GATEWAY
POLE DATA
1 61A-5-100
NO. TYPE
L.E.D.LUMINAIRE
WATTS(EQ)
SIGNAL
M.A.
65'
HEIGHT
35'
M.A.
15' SV-1-T
PPB
PEDESTRIAN
2-MAS SP-1-T
- 3SV-2-TA - 4
15' (E)
- (2)SV-1-T
-
6 - - TV-1-T (R) - 10
-
E
- MAS
-
5 2 -
- - TV-2-T
- - - 15' 12' SV-1-T MAS -
- 139
1-A (E)
17-2-100
33 (E)
1-A (R)
10'
30'
17'
10'
SP-1-T
-
-
6.5' 5' - - -
- 13.5' 6'
0.5' - 5' - - -
- - -
Ø
6 -
-
-
-6
3"
9 3"(E)
10 3"(E)
11 3-3"(E)
Ø3 DETECTOR LOOP
Ø2 DETECTOR LOOP
Ø1 DETECTOR LOOP
9 Ø1, Ø7, Ø2P, Ø2PPB
8 Ø7
7 Ø3, Ø7
1 2
3 4
5 6
7 8
9 10
-
- 12' (E) SV-2-TA - 9 15TS (E) 30' 139 (E) SP-1-T- - - 2 -
- 12' (E) (2)SV-1-T - 8 15TS (E) 30' 139 (E)- - - - -
-
- - TV-2-T- 7 1-A (E) 10' - - - - - -
- 15TS 30' 12' 139
26A-4-100(E) 35' 45' (E) 15' (E) SV-1-T 2-MAS SP-1-T 2
- - - GATEWAY
SV-1-T (R)
10 ALL EQUIPMENT IS NEW UNLESS OTHERWISE NOTED: (E) = EXISTING, (R) = REMOVE L.E.D LUMINAIRE FIXTURE SHALL BE LEOTEK (EC3-10M-MV-NW-3-GY-700-WL) OR APPROVED BY CITY ENGINEER.
CITY RIGHT OF WAY
Ø2
Ø2
Ø2
Ø5
Ø5
Ø5
Ø6
Ø6
Ø6
Ø1
Ø1
Ø7
Ø7
Ø7
Ø3 Ø3
Ø3
Ø3
Ø3
Ø7 Ø7
Ø2P
Ø2P
Ø6P Ø6P
Ø1
Ø5 Ø1
5J1U
2I2U
2I2L
2I3U
2I4U
2I4L
2I3L
5J1L
2I5U
2I5L
1I1U
6J5U
6J5L
6J3L
6J2U
6J2L
6J3U
6J4U
6J4L 7J5L 7J5U 3I5U 3I5L
EXISTING TYPE III-BF EX. 2"C, EX. 1-48SMFO TO
NORMANDIE AVE
EX. 2"C, EX. 1-48SMFO
EX. 2"C, 4DLC
EX. 3"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO TO
SHOPPING CENTER
EX. 2"C, 4DLC
139
139 (E)
285' TO
LIMIT LINE
285' TO
LIMIT LINE
1 1 1 1 1 1 1 1
4 9
-
-
- 1
1 1
-
-
-
-
-
-
-
-
-
-
- 1
-
-
-
-
-
-
-
-
-
-
-
-
- 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- 1
1 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 1
-
-
-
-
-
-
-
-
-
-
-
-
1 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- 1 - 1 -
-
-
-
-
-
-
-
-
-
-
- 11 --
-
-
-
- 1
2 - 1 - 1 - 1 23 - 1 11 11
1 1
- 1
- 1
1 1
- 1
- 1
1 1
- 1
1 1
1 4
-
-
-
-
-
-
-
-
- 1
- 1
1 1
- 1
-
-
1 3
-
-
-
-
-
-
-
-
-
-
- 1
1 1
- 1
-
-
1 1 1
2 2 2 2 - - - 2 2 2 2
3 3 3 3 1 1 1 3 3 3 3
2 2 - 2 - - - - - - 2
- - - - - - - - - 1 1
- - - 8 - - - - - - 8
- - - - 2 - - - - - 2
- 2 - 2 - - - - - - 2
- - - - - - - - 4 8 8
- - - - - 2 2 2 2 2 2
- 2 - 10 2 2 2 2 6 11 23
- - - - - - - - - - 1
12 14 18 22 21 10 10 19 30 21 19
EVP CABLE 1 1 - 1 - - - - - - 2
4 4
BC
RC
BC
CB CB
RC
CB
20 0 20 40
SCALE: 1"=20'
(16) 5
5 (12)
(4) 5
(4) 5
ARTESIA BOULEVARD
POLE AND FOUNDATION RS
RS POLE AND FOUNDATION
RS POLE AND FOUNDATION
EX. 3"C, EX. 1-12SMFO
EX. SPLICE ENCLOSURE
POLE AND RS
FOUNDATION
AB
1 6 EXISTING TYPE 332 CABINET
AB
AB
7 RC
CC
7 BC
AB
7 BC
8 RC
5 (4)
(4) 5
10 R9-3(2) & R9-3bP(2) 11
TRAFFIC SIGNAL MODIFICATION PLAN
ARTESIA BLVD AT GATEWAY
7 RC BC
5-2597
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
GENERAL NOTES (THIS SHEET ONLY):
1. ALL EXISTING SIGNAL/PEDESTRIAN HEADS, AND PEDESTRIAN PUSH BUTTONS SHALL BE REMOVED AND SALVAGED.
CONTACT UPRR MANAGER OF PUBLIC PROJECTS PRIOR TO ANY WORK WITHIN UPRR ROW OR ANY WORK FURNISH AND INSTALL NEW OPTICOM EMERGENCY VEHICLE PREEMPTION SENSOR ON TRAFFIC SIGNAL EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
FURNISH AND INSTALL NEW TYPE E LOOPS PER CITY OF GARDENA STANDARD DETAIL ST-24.
REMOVE AND SALVAGE EXISTING CONTROLLER FROM CABINET. FURNISH AND INSTALL NEW MODEL 2070 ATC CONTROLLER. FURNISH SPARE 2070 ATC CONTROLLER. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND COMPLETE ALL CONNECTIONS FOR A FULLY FUNCTIONAL TRAFFIC SIGNAL.
FURNISH AND INSTALL NEW #6 PULL BOX.
4 5
6 7
TRAFFIC SIGNAL NOTES:
FURNISH AND INSTALL NEW BATTERY BACKUP SYSTEM COMPLETE IN NEW EXTERNAL BACKPACK CABINET.
REMOVE EXISTING 332 CABINET WITH CARE. RETURN CABINET AND ALL CONTENTS TO CITY TRAFFIC SIGNAL 1 ADJUST POSITION OF SIGNS TO INSTALL ACCESSIBLE PEDESTRIAN PUSH BUTTON ON POLE.
INSTALL CONDUIT INTO EXISTING PULL BOX.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
REMOVE AND SALVAGE EQUIPMENT.
EQUIPMENT OR MATERIAL TO BE REMOVED AND BECOME THE PROPERTY OF THE CONTRACTOR.
CB
BC
RS
UPDATE VIDEO DETECTION ZONES BASED ON NEW STRIPING.
REMOVE AND SALVAGE EXISTING PEDESTRIAN PUSH BUTTON AND PLUG HOLE. 9 CONNECT NEW AND EXISTING CONDUIT. REMOVE EXISTING CONDUCTORS AND INSTALL CONDUCTORS AS INDICATED.
ABANDON. IF APPLIED TO CONDUIT, REMOVE CONDUCTORS.
CC
AB
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
M.A.G.
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
PAUL FRISLIE RCE 72982
6/5/24
1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481
PLANS PREPARED BY:
M.A.G.
P.M.F.
6/5/24
6/5/24
TRAFFIC SIGNAL MODIFICATION PLAN
47 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
6-5-24
TYPE B
DETECTOR
LEAD-IN CABLE Ø6 DETECTOR LOOP
#10 LUMINAIRE
TOTAL CABLES 3 CSC
OR CABLE TYPE
AWG SIZE, WIRE 12 CSC
1 Ø5
4 6
7 3
POLE CIRCUIT
CONDUCTOR SCHEDULE
CONDUIT RUN NUMBER
TOTAL
CONDUIT SIZES
TOTAL DLC
Ø2, Ø4
SIGNAL COMMON
Ø6, Ø6P
Ø5, Ø6, Ø6P
ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED: (E) = EXISTING CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATIONS. #12 I.I.S.N.S.
1 2 3 4 5 6 7 8
PERCENT FILL (%)
5 Ø2, Ø4
2 Ø4, Ø6PPB
Ø6PPB
Ø2 DETECTOR LOOP
- 1
1 1
1 -
- 1
- 1
- 1
- 1
12-SMFO
PHASE DIAGRAM
Ø1 Ø2 Ø3 Ø4
Ø5 Ø6 Ø7 Ø8
POLE SCHEDULE
SIGNAL MOUNTINGS
VEHICULAR M.A. (DOUBLE FACE)
LED TYPE "A" IISNS
POLE LOCATION
-B C
SHOPPING CENTER
POLE DATA
1 29-5-70 (E)
NO. TYPE
L.E.D.LUMINAIRE
WATTS(EQ)
SIGNAL
M.A.
50' (E)
HEIGHT
30'
M.A.
15' (E) SV-1-T
PPB
PEDESTRIAN
2-MAS SP-1-T
- 3
- - TV-2-T- 4
- - TV-1-T
ARTESIA BLVD
6 30' (E) 7
- SV-2-TA MAS
-
E
- - -
-
B -B
C
C
E
ECR -E BCR
POLE PLACEMENT
SHOPPING CENTER
5 50' (E) 15' (E) SV-2-TA 2-MAS
2 -
- - TV-1-T
- - -
-
- 12' (E) 139 (E)- - - 1-A
15TS (E)
1-A (E)
1-A (E)
29-5-70 (E)
18-2-70 (E)
10'
30'
10' - 30'
17'
SP-1-T
-
-
-
- - 13' - 5' - - -
- - -
- - -
- - -
- - - SHOPPING CENTER
Ø4
Ø6
Ø6
Ø6
Ø6
Ø6P
Ø6P
Ø5
Ø5
Ø2
Ø2
Ø2
Ø4
Ø4 Ø4
6 1
2 3
4 5
7 8
1 2
3 4
5 6
7 Ø5 DETECTOR LOOP
Ø
-
-
-
-
-
6 6
11 ALL EQUIPMENT IS NEW UNLESS OTHERWISE NOTED: (E) = EXISTING
CITY RIGHT OF WAY
139 (E)
139 (E)
5J1U
2I2U
2I2L
2I3U
2I4U
2I4L
2I3L
2I5U
2I5L
6J5U
6J5L
6J3L
6J2U
6J2L
6J3U
6J4U
6J4L 4I6U 4I6U
EXISTING TYPE III-BF
EX. 2"C, EX. 1-48SMFO TO
SHOPPING CENTER
EX. 2"C, EX. 1-48SMFO
EX. 2"C, EX. 1-48SMFO TO
VERMONT AVE.
EX. 2"C, 4DLC
EX. 2"C, 4DLC
285' TO
LIMIT LINE
285' TO
LIMIT LINE
EXISTING VDS CAMERA
-
-
-
-
-
-
-
-
- 1
- 1
-
-
-
-
-
-
-
-
-
-
- 1
-
-
-
-
- 1
1 1
1 -
- 1
-
-
-
-
-
-
- 1
1 1
1 -
- 1
-
-
-
-
-
-
-
- 1
1 1
-
- 1
-
-
-
-
-
-
-
-
-
- 1
-
- 1
-
-
-
-
-
-
-
-
-
-
-
-
- 1
-
-
-
-
-
- 1 1 1 1 1 1 1 1
- 2 2 2 2 - 2 2
1 3 3 3 3 1 3 3
- - - 2 2 - 2 2
- - - - 8 - - 8
- - - - 1 - - 1
- - - - - 8 8 8
- - - - 9 8 8 17
- - - - - - - 1 (E)
3"
8 11 19 27 36 16 25 28
EVP CABLE - - - 1 1 - 1 2
3"(E) 3" 3"(E) 3"(E) 3"(E) 3"(E) 2-3"(E) 1-2"(E)
2 6 - 2 - 1 23 23 22 11 - 1
VDS CABLE - - - - - - - 1 (E)
4 4
EX. 2"C, 4DLC
CC
20 0 20 40
SCALE: 1"=20'
5 (8)
(12) 5
EX. 2"C, EX 1-12SMFO
ARTESIA BOULEVARD
RS POLE AND FOUNDATION
RC
EX. SPLICE
ENCLOSURE
Ø2
DETAIL "A"
DETAIL "A"
1 R
Y
G
G
DETAIL "A"
NO SCALE
6 EXISTING TYPE 332 CABINET
CB
AB
CB
CB RC
AB
7 7 2"C, 4DLC
EX. 2"C, 4DLC
5 (4)
(4) 5
9 TRAFFIC SIGNAL MODIFICATION PLAN
ARTESIA BLVD AT SHOPPING CENTER
5-2597
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY STRIPING NOTES: FURNISH AND INSTALL 8" WHITE BARRIER LINE AS SHOWN PER CALTRANS STD. NO. A20D, DETAIL 38. FURNISH AND INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLANS A24A-A24F. FURNISH AND INSTALL 4"X7' WHITE LANE LINE @ 17' GAP, 50' PAINT ON INTERSECTION APPROACH AND DEPARTURE PER CALTRANS STD. NO. A20A, DETAIL 9. FURNISH AND INSTALL 12" WHITE LIMIT LINE/CROSSWALK LINE PER CALTRANS STD. NO. A24G. FURNISH AND INSTALL 6" DOUBLE-YELLOW LINE AS SHOWN PER CALTRANS STD. NO. A20A, DETAIL 21. 12345GENERAL NOTES (THIS SHEET ONLY): REFRESH ALL CURB PAINT PER CITY STANDARDS. ALL PAINTED CURB TO BE REMOVED AND REPLACED SHALL BE REPAINTED. FURNISH AND INSTALL LEFT EDGE PAVEMENT MARKERS FOR ALL NEW AND EXISTING MEDIANS PER DETAIL 26, CALTRANS STD. A20B. CONTRACTOR SHALL REMOVE ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS BY SANDBLASTING. 1. 2. 3. 4. FURNISH AND INSTALL CONTINENTAL CROSSWALK WITH 5' LIMIT LINE SETBACK PER CALTRANS STD. NO. A24F. LIMIT LINE SHALL BE 12" WHITE PER CALTRANS STD. NO. A24G. CROSSWALK WIDTH AS SHOWN ON PLANS. 11
MATCH LINE
SEE BOTTOM LEFT
MATCH LINE
SEE TOP RIGHT
MATCH LINE
SEE SS-02 ARTESIA BLVD
WESTERN AVE
GARDENA
MAGNOLIA WAY
DENKER AVE
ARTESIA SQUARE
DALTON AVE
MARKET PL ARTESIA BLVD 12 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION APPROVED BY : CITY OF GARDENA SHT. OF PUBLIC WORKS ENGINEERING DIVISION DRAWN BY CHECKED BY DEPARTMENT OF PUBLIC WORKS DESIGNED BY F. B. REF. LIMITS: PROJECT : NO. DWG. DATE: DATE UNDER THE SUPERVISION OF: PAUL FRISLIE RCE 72982 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2 1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481 PLANS PREPARED BY: ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT SIGNING AND STRIPING PLAN M.A.G. 6/5/24 M.A.G. P.M.F. 6/5/24 6/5/24 47 6-5-24 ARTESIA SQUARE 5-2595
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY STRIPING NOTES: FURNISH AND INSTALL 8" WHITE BARRIER LINE AS SHOWN PER CALTRANS STD. NO. A20D, DETAIL 38. FURNISH AND INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLANS A24A-A24F. FURNISH AND INSTALL 4"X7' WHITE LANE LINE @ 17' GAP, 50' PAINT ON INTERSECTION APPROACH AND DEPARTURE PER CALTRANS STD. NO. A20A, DETAIL 9. FURNISH AND INSTALL 12" WHITE LIMIT LINE/CROSSWALK LINE PER CALTRANS STD. NO. A24G. FURNISH AND INSTALL 6" DOUBLE-YELLOW LINE AS SHOWN PER CALTRANS STD. NO. A20A, DETAIL 21. FURNISH AND INSTALL 8" WHITE LINE & TYPE C RED-CLEAR RETROREFLECTIVE MARKER PER STD. NO. A20F DETAIL 42. FURNISH AND INSTALL GRADE CROSSING PAVEMENT MARKING PER CA MUTCD SECTION 8B.27. FURNISH AND INSTALL 6" WHITE LINE PER STD. NO. A20D DETAIL 40. REMOVE AND SALVAGE EXISTING SIGN AND POST COMPLETE AS SHOWN. FURNISH AND INSTALL 12" WHITE CHEVRON LINE @ C-C DISTANCE AS SHOWN. FURNISH AND INSTALL CONTINENTAL CROSSWALK WITH 5' LIMIT LINE SETBACK PER CALTRANS STD. NO. A24F. LIMIT LINE SHALL BE 12" WHITE PER CALTRANS STD. NO. A24G. CROSSWALK WIDTH AS SHOWN ON PLANS. 1234567891011GENERAL NOTES (THIS SHEET ONLY): REFRESH ALL CURB PAINT PER CITY STANDARDS. ALL PAINTED CURB TO BE REMOVED AND REPLACED SHALL BE REPAINTED. FURNISH AND INSTALL LEFT EDGE PAVEMENT MARKERS FOR ALL NEW AND EXISTING MEDIANS PER DETAIL 26, CALTRANS STD. A20B. CONTRACTOR SHALL REMOVE ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS BY SANDBLASTING. 1. 2. 3. 4. FURNISH AND INSTALL NEW SIGN ON NEW POST AS SHOWN. PROTECT IN PLACE EXISTING SIGN ON POLE AS SHOWN. FURNISH AND INSTALL NEW 24" WHITE RAILROAD LIMIT LINE PER CALTRANS STD. NO. A24G. RAILROAD LIMIT LINE SHALL BE INSTALLED 8' UPSTREAM OF GRADE CROSSING WARNING DEVICES PER CA MUTCD SECTION 8B.28. 131415 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION APPROVED BY : CITY OF GARDENA SHT. OF PUBLIC WORKS ENGINEERING DIVISION DRAWN BY CHECKED BY DEPARTMENT OF PUBLIC WORKS DESIGNED BY F. B. REF. LIMITS: PROJECT : NO. DWG. DATE: DATE UNDER THE SUPERVISION OF: PAUL FRISLIE RCE 72982 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2 1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481 PLANS PREPARED BY: ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT SIGNING AND STRIPING PLAN M.A.G. 6/5/24 M.A.G. P.M.F. 6/5/24 6/5/24 47 6-5-24
MATCH LINE
SEE SS-01
MATCH LINE
SEE SS-03
PRIVATE
PRIVATE DRIVEWAY
NORMANDIE
ALLEY
AVE ARTESIA BLVD 13 SIGN LEGEND: LANE ENDS RIGHT LANE ENDS LEFT 60' UPRR RIGHT OF WAY LOOK 5-2595
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY STRIPING NOTES: FURNISH AND INSTALL 8" WHITE BARRIER LINE AS SHOWN PER CALTRANS STD. NO. A20D, DETAIL 38. FURNISH AND INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLANS A24A-A24F. FURNISH AND INSTALL 4"X7' WHITE LANE LINE @ 17' GAP, 50' PAINT ON INTERSECTION APPROACH AND DEPARTURE PER CALTRANS STD. NO. A20A, DETAIL 9. FURNISH AND INSTALL 12" WHITE LIMIT LINE/CROSSWALK LINE PER CALTRANS STD. NO. A24G. FURNISH AND INSTALL 6" DOUBLE-YELLOW LINE AS SHOWN PER CALTRANS STD. NO. A20A, DETAIL 21. FURNISH AND INSTALL 8" WHITE LINE & TYPE C RED-CLEAR RETROREFLECTIVE MARKER PER STD. NO. A20F DETAIL 42. FURNISH AND INSTALL GRADE CROSSING PAVEMENT MARKING PER CA MUTCD SECTION 8B.27. FURNISH AND INSTALL 6" WHITE LINE PER STD. NO. A20D DETAIL 40. REMOVE AND SALVAGE EXISTING SIGN AND POST COMPLETE AS SHOWN. FURNISH AND INSTALL 12" WHITE CHEVRON LINE @ C-C DISTANCE AS SHOWN. FURNISH AND INSTALL CONTINENTAL CROSSWALK WITH 5' LIMIT LINE SETBACK PER CALTRANS STD. NO. A24F. LIMIT LINE SHALL BE 12" WHITE PER CALTRANS STD. NO. A24G. CROSSWALK WIDTH AS SHOWN ON PLANS. FURNISH AND INSTALL CONTINENTAL CROSSWALK WITH 5' LIMIT LINE SETBACK PER LADOT STD. DWG. NO. S-481.1. REMOVE CONFLICTING STRIPING. FURNISH AND INSTALL NEW SIGN ON NEW POST AS SHOWN. PROTECT IN PLACE EXISTING SIGN ON POLE AS SHOWN. 1234567891011121314 GENERAL NOTES (THIS SHEET ONLY): REFRESH ALL CURB PAINT PER CITY STANDARDS. ALL PAINTED CURB TO BE REMOVED AND REPLACED SHALL BE REPAINTED. FURNISH AND INSTALL LEFT EDGE PAVEMENT MARKERS FOR ALL NEW AND EXISTING MEDIANS PER DETAIL 26, CALTRANS STD. A20B. CONTRACTOR SHALL REMOVE ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS BY SANDBLASTING. 1. 2. 3. 4. CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY CITY RIGHT OF WAY N0. REVISIONS DATE BY APP. ENGINEERING DIVISION APPROVED BY : CITY OF GARDENA SHT. OF PUBLIC WORKS ENGINEERING DIVISION DRAWN BY CHECKED BY DEPARTMENT OF PUBLIC WORKS DESIGNED BY F. B. REF. LIMITS: PROJECT : NO. DWG. DATE: DATE UNDER THE SUPERVISION OF: PAUL FRISLIE RCE 72982 WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2 1700 Carnegie Avenue, Suite 100 Santa Ana, CA 92705-5551 Phone: (949) 270-9480 Fax: (949) 270-9481 PLANS PREPARED BY: ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT SIGNING AND STRIPING PLAN M.A.G. 6/5/24 M.A.G. P.M.F. 6/5/24 6/5/24 47 6-5-24
MATCH LINE
SEE ABOVE RIGHT
SHOPPING
VERMONT AVE
CENTER ARTESIA BLVD 14
MATCH LINE
SEE SHEET SS-02
MATCH LINE
SEE BELOW LEFT ARTESIA BLVD
GATEWAY
5-2595
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1FOR DATE
SYMBOL DESCRIPTION
EXISTING STAMPED PAVING - PROTECT IN PLACE
EXISTING SIGNAGE AND (6) LIGHT FIXTURES - PROTECT IN PLACE
EXISTING ELECTRICAL METER - PROTECT IN PLACE
EXISTING GAS METER - PROTECT IN PLACE
EXISTING MANHOLE - PROTECT IN PLACE
TRAFFIC BOX - PROTECT IN PLACE
CONTROLLER ASSEMBLY - REFER TO IRRIGATION PLAN
EXISTING CROSSING WARNING DEVICE AND FLASHERS - PROTECT IN PLACE
R-01
R-02
R-03
R-04
R-05
R-06
R-07
R-08
REFERENCE LEGEND
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 19,547 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 31,398 SF
D-01
D-02
DEMOLITION LEGEND
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 14,550 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 3,830 SF E/46 TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
STABILIZED DECOMPOSED GRANITE 65 SF
COLOR: GOLD
NOTE: INSTALL AND COMPACTED ON NATIVE, 4 INCH THICK
C-01
C-02
C-03
CONSTRUCTION LEGEND
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
15 8-1059
LEGENDS AND NOTES
DEMOLITION NOTES
1. VERIFY PROPERTY LINES, LIMITS OF WORK LINES AND LOT LINES PRIOR TO COMMENCING DEMOLITION WORK.
2. CONTRACTOR SHALL NOT WILLFULLY PROCEED WITH DEMOLITION WHEN IT IS OBVI0US IN THE FIELD THAT UNKNOWN OBSTRUCTIONS OR CONDITIONS EXIST THAT MAY NOT HAVE BEEN KNOWN DURING PREPARATION OF THESE PLANS.
3. NO CHANGE IN CONTRACT AMOUNT SHALL BE ALLOWED DUE TO ACTUAL OR
CLAIMED DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THOSE SHOWN ON THE PLAN, INCLUDING QUANTITIES CALLED OUT ON PLAN. UNLESS SUCH
DISCREPANCIES ARE BROUGHT TO THE IMMEDIATE ATTENTION OF THE GENERAL CONTRACTOR AND CITY REPRESENTATIVE IN WRITING.
4. EXISTING PLANT MATERIAL SPECIFICALLY CALLED OUT TO BE REMOVED SHALL
INCLUDE A REASONABLE AMOUNT OF THE ROOT BALL WITH EACH TREE OR SHRUB. PLANT MATERIAL THAT IS TO BE REMOVED SHALL BE DISPOSED OF LEGALLY OFF-SITE.
5. THE DEMOLITION BASE SHEET WAS PREPARED FROM EXISTING INFORMATION DOCUMENTED IN THE FIELD. THE INFORMATION REPRESENTED ON THIS PLAN IS NOT FROM AS-BUILT PLANS. THEREFORE CONDITIONS SHALL BE VERIFIED BY CONTRACTOR. THE CONTRACTOR SHALL CONFIRM CONDITIONS IN THE FIELD
AFFECTING THE SATISFACTORY COMPLETION OF DEMOLITION WORK DESCRIBED
ON THE PLAN AND REPORT DISCREPANCIES TO THE CITY / ENGINEER IMMEDIATELY. THE CITY / ENGINEER SHALL PROVIDE RESOLUTION DIRECTION PRIOR TO PROCEEDING WITH ANY FURTHER DEMOLITION WORK.
6. THIS PLAN IS FOR THE PURPOSE OF IDENTIFYING THE PRESERVATION, REMOVAL,
DEMOLITION AND OR SALVAGE OF LANDSCAPE AND HARDSCAPE CONSTRUCTION ITEMS ONLY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR AND REPLACEMENT OF ANY DAMAGE TO ADJACENT ELEMENTS CAUSED BY HIS/HER OPERATIONS.
8. THE CONTRACTOR SHALL CONFIRM AND PROTECT EXISTING UTILITY SERVICES & METERS IN PLACE.
9. DAMAGE TO EXISTING SOFTSCAPE AND HARDSCAPE THAT ARE NOT CALLED OUT
FOR REMOVAL SHALL BE REPAIRED OR REPLACED AND THE COST BORNE BY THE CONTRACTOR.
10. ALL WORK SHALL CONFORM TO APPLICABLE LOCAL CODES.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING IN PLACE ALL CURBS,
PAVING, IRRIGATION EQUIPMENT, UTILITY BOXES, TREES AND TREE ROOTS AND/OR OTHER EXISTING APPURTENANCES ON THE MEDIANS. SPECIAL CARE
SHOULD BE GIVEN TO THE EXISTING IRRIGATION MAIN LINE, BACKFLOW PREVENTER, AND IRRIGATION APPURTENANCE CONNECTION POINTS. ALL
DAMAGE TO EXISTING ITEMS LISTED ABOVE SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S COST.
12. CONTRACTOR SHALL CLEAR AND GRUB AREAS PER THE PLANTING NOTES, SEE SHEET 43. CONTRACTOR SHALL REMOVE ALL EXISTING SHRUBS, GROUNDCOVER, DEBRIS AND ROCKS OVER 1" DIAMETER WITH THE PLANTING AREAS. ALL
MATERIALS REMOVED FROM THE SITE SHALL BE DISPOSED IN A MANNER CONFORMING TO ALL CODES AND ORDINANCES RELATIVE TO THAT WORK.
IRRIGATION NOTES:
1. PIPE SIZES SHALL CONFORM TO THOSE SHOWN ON DRAWINGS.
NO SUBSTITUTIONS OF SMALLER PIPE SIZES SHALL BE
PERMITTED, BUT SUBSTITUTIONS OF LARGER SIZES MAY BE
APPROVED. ALL DAMAGED AND REJECTED PIPE SHALL BE
REMOVED FROM THE SITE AT THE SAID TIME OF REJECTION.
2. SPRINKLER HEADS SHALL BE PERPENDICULAR TO FINISH GRADE UNLESS OTHERWISE SPECIFIED.
3. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL
SPRINKLER HEADS AND VALVES FOR OPTIMUM COVERAGE WITH
MINIMUM OVERSPRAY ONTO WALKS, STREETS, WALLS, ETC.
4. THIS DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ETC.,
SHOWN WITHIN PAVED AREAS IS FOR DESIGN CLARIFICATION
ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHEREVER
POSSIBLE. THE CONTRACTOR SHALL LOCATE ALL VALVES IN
SHRUB AREAS.
5. IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO
BECOME FAMILIAR WITH ALL GRADE DIFFERENCES, LOCATION
OF WALLS, RETAINING WALLS, STRUCTURES AND UTILITIES. THE
IRRIGATION CONTRACTOR SHALL REPAIR OR REPLACE ITEMS
DAMAGED BY WORK. SHALL ALSO COORDINATE WORK WITH
OTHER CONTRACTORS FOR THE LOCATION AND INSTALLATION
OF PIPE SLEEVES AND LATERALS THROUGH WALLS, UNDER
ROADWAYS AND PAVING, ETC.
6. DO NOT WILLFULLY INSTALL THE SPRINKLER SYSTEM AS
SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD
THAT UNKNOWN OBSTRUCTIONS, GRADE DIFFERENCES OR
DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. SUCH
OBSTRUCTIONS OR DIFFERENCES SHOULD BE BROUGHT TO THE
ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. IN
THE EVENT THIS NOTIFICATION IS NOT PERFORMED, THE
IRRIGATION CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY
FOR ANY REVISIONS NECESSARY.
7. MATERIALS AND EQUIPMENT SHALL CONFORM TO APPLICABLE
STATE OF CALIFORNIA AND LOCAL CODES.
8. ALL IRRIGATION WORK SHALL CONFORM TO THE CITY OF
GARDENA DETAIL DRAWINGS (IF/AS APPLICABLE) AND
SPECIFICATIONS.
9. THE CONTRACTOR SHALL FLUSH AND ADJUST ALL HEADS FOR
OPTIMUM PERFORMANCE AND TO THE PREVENT OVERSPRAY
ONO PAVING AND ROADWAYS. THIS SHALL INCLUDE SELECTING
THE BEST DEGREE OF ARC TO FIT THE EXISTING SITE
CONDITIONS AND TO THROTTLE THE FLOW CONTROL AT EACH
VALVE TO OBTAIN THE OPTIMUM OPERATING PRESSURE FOR
EACH SYSTEM.
10. ALL POP-UP TYPE SPRINKLER HEADS INSTALLED SHALL BE
INSTALLED SO THAT THE TOP OF THE SPRINKLER HEAD IS ONE
INCH ABOVE FINISH GRADE.
11. ALL NEW HEADS SHALL BE INSTALLED PERPENDICULAR TO
EXISTING FINISH GRADES.
12. FLUSH ALL LATERAL LINES WITH VALVE ASSEMBLIES INSTALLED, PRIOR TO NOZZLE INSTALLATION. CHECK FOR ANY AND ALL
EXISTING PIPE CRACKS AND/OR DAMAGE. ALL DAMAGED PIPE
SHALL BE REPLACED AT CONTRACTOR'S COST TO THE
SATISFACTION OF THE CITY.
13. ALL FITTINGS, NIPPLES AND COUPLINGS SHALL BE PVC
SCHEDULE 80 MATERIAL.
14. ALL EXCAVATION WORK PERFORMED WITHIN ROOT PROTECTION ZONES AS DETERMINED BY THE ENGINEER SHALL BE HAND DUG.
NO TRENCHING IN ROOT PROTECTION ZONES SHALL BE
ALLOWED.
15. ALL SYSTEMS SHALL BE OPERATIONAL AND ADJUSTED, HAVING
BEEN APPROVED BY THE ENGINEER PRIOR TO ANY PLANTING OF
SHRUBS. CONTRACTOR SHALL ASK FOR A FINAL INSPECTION OF
THE ENTIRE IRRIGATION SYSTEM BY THE ENGINEER TO
ESTABLISH A PUNCH-LIST. PUNCH-LIST ITEMS SHALL BE
COMPLETED AND ACCEPTED BY THE CITY PRIOR TO PLANTING
SHRUBS.
16. ALL EXISTING IRRIGATION MAINLINE AND APPURTENANCES PER
IRRIGATION LEGEND SHALL BE PROTECTED IN PLACE AS
POSSIBLE. CONTRACTOR SHALL REPLACE AND/OR REPAIR ANY
DAMAGE TO THE EXISTING SYSTEMS AS DIRECTED BY THE CITY.
NOTE:
FOR DEMOLITION PLAN, SEE SHEETS 16 THROUGH 24.
FOR IRRIGATION PLAN, SEE SHEETS 25 THROUGH 33.
FOR IRRIGATION DETAILS, LEGENDS, CALCULATIONS, SEE
SHEETS 34 THROUGH 36.
FOR PLANTING PLAN, SEE SHEETS 37 THROUGH 45.
FOR PLANTING DETAILS, LEGENDS, AND NOTES, SEE SHEETS 46 THROUGH 47.
1. THE CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DISTANCES IN
THE FIELD AFTER CONSTRUCTION OF THE BUILDINGS AND CURBS
TO INSURE THAT THE DESIGN CAN BE MET AS INTENDED PER
THESE PLANS. ANY FIELD DISCREPANCIES OR DEFICIENCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT
FOR RESOLUTION PRIOR TO THE CONSTRUCTION OR INSTALLATION OF ANY SITE OR LANDSCAPE RELATED ELEMENTS. ALL
CONSTRUCTION ITEMS MUST ALWAYS COMPLY WITH ALL
APPLICABLE CODES AND ORDINANCES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING HIMSELF
FAMILIAR WITH ALL EXISTING AND PROPOSED UNDERGROUND
UTILTIES, PIPES AND STRUCTURES. CONTRACTOR SHALL TAKE
SOLE RESPONSIBILITY FOR COST INCURRED TO DAMAGE AND
REPLACEMENT OF SAID UTILTIES.
3. CONTRACTOR SHALL NOT WILLFULLY PROCEED WITH
CONSTRUCTION AS DESIGNED WHEN IT IS OBVIOUS THAT
UNKNOWN OBSTRUCTIONS, AREA DISCREPANCIES AND/OR GRADE
DIFFERENCES EXIST THAT MAY NOT HAVE BEEN KNOWN DURING
DESIGN. SUCH CONDITIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT. THE
CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL
NECESSARY REVISIONS DUE TO FAILURE TO GIVE SUCH
NOTIFICATION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COORDINATION
WITH SUBCONTRACTORS AS REQUIRED TO ACCOMPLISH ALL
CONSTRUCTION OPERATIONS. ALL PIPING, CONDUIT, SLEEVES,
ETC. SHALL BE SET IN PLACE PRIOR TO INSTALLATION OF
CONSTRUCTION ITEMS.
5. REFER TO CITY, COUNTY, STATE OR FEDERAL STANDARD PLANS, CODES AND REQUIREMENTS AS APPLICABLE.
6. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ANY
EXISTING MATERIALS THAT ARE DAMAGED DURING
CONSTRUCTION.
7. REFER TO CIVIL ENGINEER'S GRADING PLANS FOR GRADING, DRAINAGE STRUCTURES, PIPING, ETC. PRIOR TO INSTALLATION OF WALKS, WALLS, FOOTINGS AND OTHER STRUCTURES.
8. PRIOR TO INSTALLATION OF HARDSCAPE, ALL FORMS AND LAYOUTS
MUST BE OBSERVED AND ACCEPTED BY THE LANDSCAPE
ARCHITECT OR THE OWNERS AUTHORIZED REPRESENTATIVE.
9. PRIOR TO INSTALLATION OF ANY CONSTRUCTION ITEMS, FORMS
WITH STEEL IN PLACE AND COMPACTED SUBGRADE COMPLETE
MUST BE OBSERVED AND APPROVED BY THE LANDSCAPE
ARCHITECT.
10. CONTRACTOR SHALL SUBMIT ALL SAMPLES PER SPECIFICATIONS.
THE LANDSCAPE ARCHITECT SHALL APPROVE ALL SAMPLES
PRIOR TO CONSTRUCTION, FABRICATION AND/OR PURCHASE.
11. ALL PROPERTY LINES AND LOT LINES SHALL BE VERIFIED PRIOR TO COMMENCING WORK.
12. ALL ELECTRICAL JUNCTION BOXES FOR LIGHTS SHALL BE
CONCEALED IN PLANTING AREAS AS APPROVED BY LANDSCAPE
ARCHITECT.
13. ALL LANDSCAPE INSTALLATION SHALL BE PERFORMED BY A
LICENSED CONTRACTOR WITH A C-27 LICENSE OR GREATER.
14. CONSTRUCTION REQUIREMENTS, MATERIALS, AND CONSTRUCTION
TECHNIQUES SHALL COMPLY WITH ALL LOCAL CODES AND
ORDINANCES
15. THE TOP OF FOOTINGS FOR CONCRETE OR MASONRY WALLS
WHICH ABUT PLANTER AREAS AND THAT ARE LESS THAN 36
INCHES IN WIDTH SHALL BE DEEPENED TO 24 INCHES TO PERMIT IRRIGATION PIPE AND PLANTING INSTALLATION. COORDINATION WITH THE CIVIL ENGINEER. MAY ALSO BE REQUIRED AS THERE MAY
BE POINTS OF CONFLICT WITH THE CIVIL'S STORM DRAIN LINES LOCATED IN THE VICINITY.
16. CONTRACTOR SHALL ALLOW FOR THE POSSIBILITY OF FIELD
ADJUSTMENTS TO FINE TUNING OF WALL HEIGHTS (PARTICULARLY RETAINING TO FREE STANDING WALLS) IN BID.
CONSTRUCTION NOTES
ARIZONA COBBLE
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY GARDENA MARKET PLACE
ARTESIA BLVD LIMIT OF WORK
D-01
D-01 EXISTING TREE
PROTECT IN PLACE
D-02
D-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 2
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 16
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 123 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 1,671 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 16 MATCHLINE - SEE SHEET 17
N O R T H
0 40 feet
1" = 20'
20 60 80
16 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059
LANDSCAPE DEMOLITION PLAN
KEYMAP
SCALE: NTS
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY MAGNOLIA WAY DENKER AVENUE
ARTESIA BLVD
D-01 D-01 D-01
D-01
D-01 EXISTING TREE
PROTECT IN PLACE
D-02 D-02 D-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 1
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 17
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 1,277 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 3,216 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 17
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 16 MATCHLINE - SEE SHEET 18 17 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY DALTON AVENUE
ARTESIA BLVD PRIVATE ALLEY
T MH
G
R-06 D-01
D-01
EXISTING TREE
PROTECT IN PLACE
R-05
D-01 R-04
D-02
D-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 1
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 18
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 632 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 2,700 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 18
SYMBOL DESCRIPTION
EXISTING GAS METER - PROTECT IN PLACE
EXISTING MANHOLE - PROTECT IN PLACE
TRAFFIC BOX - PROTECT IN PLACE
R-04
R-05
R-06
REFERENCE LEGEND - SHEET 18
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 17 MATCHLINE - SEE SHEET 19 18 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
ARTESIA BLVD PRIVATE DRIVEWAY
EXISTING TREE
PROTECT IN PLACE
D-01
D-01
D-01 D-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 1
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
EXISTING MELALEUCA 1
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 19
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 3,297 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 907 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 19
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 18 MATCHLINE - SEE SHEET 20 19 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY NORMANDIE AVENUE
ARTESIA BLVD
E
EXISTING TREE
PROTECT IN PLACE
EXISTING TREE
PROTECT IN PLACE
R-03
D-01 D-01
D-01
D-02
60'-0" UPRR
RIGHT OF WAY
DOT # 760511 G
R-08
R-08
R-08
R-08
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 2
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
EXISTING MELALEUCA 1
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 20
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 3,148 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 1,740 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 20
SYMBOL DESCRIPTION
EXISTING ELECTRICAL METER - PROTECT IN PLACE
EXISTING CROSSING WARNING DEVICE AND FLASHERS - PROTECT IN PLACE
R-03
R-08
REFERENCE LEGEND - SHEET 20
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 19 MATCHLINE - SEE SHEET 21 20 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY
ARTESIA BLVD
EXISTING TREE
TO BE REMOVED
EXISTING TREE
PROTECT IN PLACE
D-01
D-01
D-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 1
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
EXISTING MELALEUCA 3
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 21
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 2,864 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 5,169 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 21
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 20 MATCHLINE - SEE SHEET 22 21 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY GATEWAY
CITY RIGHT OF WAY
ARTESIA BLVD GATEWAY
D-01
D-01
D-01
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION QTY
D-01 REMOVE AND DISPOSE EXISTING HARDSCAPE 4,451 SF
DEMOLITION LEGEND - SHEET 22
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 21 MATCHLINE - SEE SHEET 23 22 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY
ARTESIA BLVD SHOPPING PRIVATE CENTER DRIVEWAY
E
R-03
EXISTING TREE
PROTECT IN PLACE
EXISTING TREE
PROTECT IN PLACE
EXISTING TREE
PROTECT IN PLACE
D-01
D-02
EXISTING TREE
TO BE REMOVED
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING LAGERSTROEMIA 2
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
EXISTING MELALEUCA 6
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 23
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 112 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 8,983 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 23
SYMBOL DESCRIPTION
R-03 EXISTING ELECTRICAL METER - PROTECT IN PLACE
REFERENCE LEGEND - SHEET 23
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 22 MATCHLINE - SEE SHEET 24 23 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
ARTESIA BLVD SHOPPING CENTER CENTER VERMONT AVENUE PRIVATE DRIVEWAY PRIVATE DRIVEWAY E
E LIMIT OF WORK
R-03
EXISTING TREE
PROTECT IN PLACE
R-03
R-01
D-01
R-02
D-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
TREES BOTANICAL / COMMON NAME QTY
EXISTING MELALEUCA 3
PROTECT IN PLACE
UNLESS OTHERWISE
NOTED ON PLAN
TREE DISPOSITION LEGEND - SHEET 24
SYMBOL DESCRIPTION QTY
REMOVE AND DISPOSE EXISTING HARDSCAPE 3,754 SF
GRUB AND CLEAR ALL SHRUBS AND GROUNDCOVER 7,108 SF
D-01
D-02
DEMOLITION LEGEND - SHEET 24
SYMBOL DESCRIPTION
EXISTING STAMPED PAVING - PROTECT IN PLACE
EXISTING SIGNAGE AND (6) LIGHT FIXTURES - PROTECT IN PLACE
EXISTING ELECTRICAL METER - PROTECT IN PLACE
R-01
R-02
R-03
REFERENCE LEGEND - SHEET 24
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 23
24 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
LANDSCAPE DEMOLITION PLAN
NOTE:
FOR OVERALL DEMOLITION LEGEND, SEE SHEET 15.
FOR DEMOLITION NOTES, SEE SHEET 15.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY GARDENA MARKET PLACE
ARTESIA BLVD LIMIT OF WORK ex new exex
A1 3.18
1" A
D1
A2 0.27
1" D
D2
7.32 A3
A 1"
0.27 A4
D 1"
3 4" 3
4"
3 4" 3
4"
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
4 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
8 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
1 L/35
RAIN BIRD ARV050
1/2" AIR RELIEF VALVE, MADE OF QUALITY RUST-PROOF
MATERIALS, WITH A 6.0" DRIP VALVE BOX (SEB 7XB EMITTER
BOX). USE WITH INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS PREVENTING
WATER HAMMER OR BLOCKAGE.
2 M/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-18
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS. AVAILABLE ONLY IN CALIFORNIA
714.6 S.F. I/34
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
77.2 S.F. K/35
MANUFACTURER/MODEL/DESCRIPTION
IRRIGATION LEGEND - SHEET 25
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING QUICK COUPLER VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
3 S/35
EXISTING BALL VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
1 IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
226.3 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 521.0 L.F.
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING
(LIGHT LAVENDER - STANDARD)
TREE DISPOSITION LEGEND - SHEET 25
SYMBOL DESCRIPTION
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
REFERENCE LEGEND - SHEET 25 MATCHLINE - SEE SHEET 26
N O R T H
0 40 feet
1" = 20'
20 60 80
25 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059
LANDSCAPE IRRIGATION PLAN
KEYMAP
SCALE: NTS
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTE: DRAWING IS DIAGRAMMATIC
NOTES: FOR DESIGN CLARIFICATION ONLY.
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY MAGNOLIA WAY DENKER AVENUE
ARTESIA BLVD
SB exexex
0.45 A6
D 1"
A7 6.75
1" A
3 4" 3
4" 3
4"
4.09 A5
A 1"
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
3 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
7 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
5 L/35
RAIN BIRD ARV050
1/2" AIR RELIEF VALVE, MADE OF QUALITY RUST-PROOF
MATERIALS, WITH A 6.0" DRIP VALVE BOX (SEB 7XB EMITTER
BOX). USE WITH INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS PREVENTING
WATER HAMMER OR BLOCKAGE.
2 M/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-18
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS. AVAILABLE ONLY IN CALIFORNIA
3,657 S.F. I/34
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
69.0 S.F. K/35
IRRIGATION LEGEND - SHEET 26
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING REMOTE CONTROL VALVE - NOT USED
REMOVE AND CAP
4 EXISTING QUICK COUPLER VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
6 S/35
EXISTING BALL VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
3 EXISTING SPLICE BOX - PROTECT IN PLACE 1
IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
210.8 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 539.3 L.F.
PIPE SLEEVE: PVC SCHEDULE 40
PIPE SLEEVE LOCATION. INSTALL A MIN. 12" BEYOND EDGE OF HARDSCAPE. SEE PLAN FOR SIZES.
28.2 L.F. F/34
SB
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING
(LIGHT LAVENDER - STANDARD)
TREE DISPOSITION LEGEND - SHEET 26
SYMBOL DESCRIPTION
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
REFERENCE LEGEND - SHEET 26
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 25 MATCHLINE - SEE SHEET 27 26 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY DALTON AVENUE
ARTESIA BLVD
T MH
G PRIVATE ALLEY
A
FS
R-05
R-06
R-04ex
ELECTRICAL P.O.C. AT EXISTING
TRAFFIC SIGNAL CABINET
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
PULL SHIELDED POWER CABLE
THROUGH EXISTING TRAFFIC
CONTROL CONDUIT (FOR REFERENCE
ONLY - REFER TO CIVIL PLANS)
NEW PULLBOX ADJACENT TO ADVANCED TRAFFIC
LOOP BOX CONDUIT TERMINATION.
BROOKS PB36 PULLBOX (VERIFY TYPE).
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
BORE OR TRENCH NEW 2 INCH SCHEDULE
PVC SLEEVE (FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
CONDUIT FROM NEW PULLBOX TO NEW MEDIAN PULLBOX.
BROOKS PB36 PULLBOX (VERIFY TYPE).
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
EXTENDED 2 INCH CONDUIT WITH SWEEP
ELLS TO NEW CONTROLLER ASSEMBLY ex
9.31 A8
A 1"
0.45 A9
D 1"
3 4"
1 1
4"
1"
PB
PB
3 4" 1" 1"
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
EXISTING GAS METER - PROTECT IN PLACE
EXISTING MANHOLE - PROTECT IN PLACE
TRAFFIC BOX - PROTECT IN PLACE
R-04
R-05
R-06
REFERENCE LEGEND - SHEET 27
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING
(LIGHT LAVENDER - STANDARD)
TREE DISPOSITION LEGEND - SHEET 27
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
2 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
4 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
2 L/35
RAIN BIRD ARV050
1/2" AIR RELIEF VALVE, MADE OF QUALITY RUST-PROOF
MATERIALS, WITH A 6.0" DRIP VALVE BOX (SEB 7XB EMITTER
BOX). USE WITH INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS PREVENTING
WATER HAMMER OR BLOCKAGE.
1 M/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-18
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS. AVAILABLE ONLY IN CALIFORNIA
2,629 S.F. I/34
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
69.0 S.F. K/35
IRRIGATION LEGEND - SHEET 27
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING BALL VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
2 BUCKNER-SUPERIOR 3200-NXT 1"
NORMALLY CLOSED BRASS MASTER VALVE THAT PROVIDES
DIRTY WATER PROTECTION, NO MINIMUM FLOW FEATURE AND
NO EXTERNAL TUBING. AVAILABLE IN 3/4", 1", 1-1/2", 2", 2-1/2", AND 3".
1 C/34
EXISTING - PROTECT IN PLACE: FEBCO 1-1/2"
REDUCED PRESSURE BACKFLOW PREVENTER
1 B/34
CONTROLLER ASSEMBLY `A`
HUNTER I-CORE CONTROLLER IN STAINLESS STEEL ENCLOSURE
WITH RAIN SENSOR. SEE SHEET 33 FOR ASSEMBLY MODEL
NUMBER AND SPECIFICATIONS. AVAILABLE THROUGH GREEN
PRODUCT SALES. CONTACT DARYL GREEN (949) 584-7311. (OR
APPROVED EQUAL)
1 A/34
CST FLOW SENSOR IFS-100C
CREATIVE SENSOR TECHNOLOGY
1 D/34
PULLBOX
BROOKS PB36 PULLBOX
2 T/35
POINT OF CONNECTION 1 1/2"
50-150 PSI PROVIDED BY GOLDEN STATE WATER (FEB 11, 2022). 75 PSI MINIMUM REQUIRED FOR SYSTEM OPERATION.
1 IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
143.5 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 606.1 L.F.
PIPE SLEEVE: PVC SCHEDULE 40
PIPE SLEEVE LOCATION. INSTALL A MIN. 12" BEYOND EDGE OF HARDSCAPE. SEE PLAN FOR SIZES.
14.7 L.F. F/34
A
FS
PB
(EXISTING)
O/35
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 26 MATCHLINE - SEE SHEET 28 27 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
POINT OF CONNECTION - CONTROLLER A:
WATER METER LOCATED AS SHOWN ON THE
APPROVED SEWER AND WATER PLANS PROVIDED BY
THE CIVIL ENGINEER OF RECORD
METER SIZE: 1 1/2"
SERVICE LINE SIZE: 1 1/2"
ELEVATION OF METER: - STATIC PRESSURE: 75 PSI MIN. REQUIRED PUMP REQUIRED: NO
AREA SERVED: 10,587 SF
CONTROLLER ASSEMBLY - A:
CONTROLLER INSTALLED STAINLESS STEEL ENCLOSURE. PROVIDED BY GREEN PRODUCT SALES. CONTACT: DARYL GREEN 949-584-7311.
ASSEMBLY MODEL #
ICA6-HU7-18/SP/SOLSE/IFS-100C/TU3D-6/(2)3DDEC/TSP/GRD-K/LBR-2 CONTROLLER: HUNTER IC-1800 (ENCLOSURE MOUNT)
NUMBER OF STATIONS: 18 TOTAL (11 USED)
POWER USAGE: 120 / 240 VAC, 50 / 60 HZ.
MAX AC DRAW: 1 AMPS / 120 V - 2 AMPS / 230 V
WIRE TYPE: CONVENTIONAL
#14AWG (PILOT WIRES)
#12 AWG (COMMON WIRE)
NOTE: IF FIELD SPLICES ARE REQUIRED, PLACE IN PULL BOX PER DETAIL 'T' / SHEET 35.
LANDSCAPE IRRIGATION PLAN
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
CABLE NOTE: FOR COMMUNICATION BETWEEN
LOCAL DECODERS AND NEW MAIN LINE RUNS.
P-7072D PAIGE ELECTRIC COMMUNICATION
CABLE – 14 AWG/2 CONDUCTOR “MAXI” CABLE
WITH TWO TYPE UF WIRES WITH A PE OUTER
JACKET. THE COLORS OF THE OUTER JACKET
SHALL BE AS CALLED-FOR IN THE IRRIGATION
PLANS AND SPECIFICATIONS.
PAIGE PART #PRODUCT DESCRIPTION
180115 14 AWG RED JACKET
180126 14 AWG WHITE
PAIGE PART #PRODUCT DESCRIPTION
180127 14 AWG BLACK
180114 14 AWG ORANGE
180116 14 AWG BLUE
180118 14 AWG YELLOW
1801181 14 AWG PURPLE
1801182 14 AWG BROWN
1801151 14 AWG PINK
1801183 14 AWG GRAY
180117 14 AWG GREEN
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
ARTESIA BLVD PRIVATE DRIVEWAY
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
3 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
1 L/35
RAIN BIRD ARV050
1/2" AIR RELIEF VALVE, MADE OF QUALITY RUST-PROOF
MATERIALS, WITH A 6.0" DRIP VALVE BOX (SEB 7XB EMITTER
BOX). USE WITH INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS PREVENTING
WATER HAMMER OR BLOCKAGE.
1 M/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
103.5 S.F. K/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING REMOTE CONTROL VALVE - NOT USED
REMOVE AND CAP
1 EXISTING QUICK COUPLER VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
1 S/35
IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
54.4 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 617.5 L.F.
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
IRRIGATION LEGEND - SHEET 28
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
EXISTING MELALEUCA
PROTECT IN PLACE
MELALEUCA QUINQUENERVIA / CAJEPUT TREE
(SINGLE TRUNK)
TREE DISPOSITION LEGEND - SHEET 28
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 27 MATCHLINE - SEE SHEET 29 28 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY NORMANDIE AVENUE
ARTESIA BLVD
E
60'-0" UPRR
RIGHT OF WAY
DOT # 760511G
R-03 exex
CAP & ABANDON EXISTING MAINLINE
A10 1.58
1" D
A11 11.3
1" A
3 4" 1"
1 1
4" 1"
R-08
R-08 R-08
R-08
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
EXISTING ELECTRICAL METER - PROTECT IN PLACE
EXISTING CROSSING WARNING DEVICE AND FLASHERS - PROTECT IN PLACE
R-03
R-08
REFERENCE LEGEND - SHEET 29
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
EXISTING MELALEUCA
PROTECT IN PLACE
MELALEUCA QUINQUENERVIA / CAJEPUT TREE
(SINGLE TRUNK)
TREE DISPOSITION LEGEND - SHEET 29
CAP & ABANDON EXISTING MAINLINE
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
2 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
5 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
1 L/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-18
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS. AVAILABLE ONLY IN CALIFORNIA
2,550 S.F. I/34
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
138.0 S.F. K/35
MANUFACTURER/MODEL/DESCRIPTION
IRRIGATION LEGEND - SHEET 29
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING QUICK COUPLER VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
3 S/35
IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
155.0 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 525.7 L.F.
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 28 MATCHLINE - SEE SHEET 30 29 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY
ARTESIA BLVD
T
K K K M M M
K
M
M
M
K
K K K
K K
M exexnew
3 4"
1"
CAP & ABANDON EXISTING MAINLINE
11.2 B1
E 1"
NEW MAINLINE FROM
VALVES B2 AND B3
K K
K M M M M M M M M M M M
M M M M M M M M M M M M K
EX
11.4 B2
E 1"
D8
1.35 B3
D 1"
D9
1 1
4" 3
4" CUT AND CAP EXISTING
MAINLINE AT EXISTING
BACKFLOW PREVENTER
AND MEDIAN LEG.
EXISTING BACKFLOW
PREVENTER SERVING
SHOPPING CENTER
AND MEDIAN.
EXISTING IRRIGATION CONTROLLER SERVES SHOPPING CENTER AND MEDIAN. DISCONNECT CONTROL WIRES SERVING MEDIAN. PROTECT
EXISTING WIRING WITHIN MEDIAN AND DETERMINE CONNECTIVITY OF EXISTING WIRING OF VALVES FOR CONNECTION TO NEW CONTROLLER 'B'. 1 1
4" 1"
3 4" 3
4"
1"
3 4"
2"
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI DETAIL
HUNTER MP CORNER PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH FACTORY INSTALLED CHECK
VALVE, PRESSURE REGULATED TO 40 PSI, MP ROTATOR NOZZLE.
T=TURQUOISE ADJ ARC 45-105 ON PRS40 BODY.
1 40 J/35
HUNTER MP1000 PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. M=MAROON ADJ
ARC 90 TO 210, L=LIGHT BLUE 210 TO 270 ARC, O=OLIVE 360 ARC ON PRS40 BODY.
30 40 J/35
HUNTER MP2000 PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. K=BLACK ADJ
ARC 90-210, G=GREEN ADJ ARC 210-270, R=RED 360 ARC ON
PRS40 BODY.
14 40 J/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
1 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
6 AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
207.1 S.F. K/35
MANUFACTURER/MODEL/DESCRIPTION
T
M L O
K G R
IRRIGATION LEGEND - SHEET 30
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER ICV-G
1", 1-1/2", 2", AND 3" PLASTIC ELECTRIC REMOTE CONTROL
VALVES, GLOBE CONFIGURATION, WITH NPT THREADED
INLET/OUTLET, FOR COMMERCIAL/MUNICIPAL USE.
2 H/34
EXISTING BACKFLOW PREVENTER 3/4"
PROTECT-IN-PLACE
1 EXISTING IRRIGATION CONTROLLER
PROTECT-IN-PLACE
1 IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
747.6 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 839.0 L.F.
IRRIGATION MAINLINE: PVC SCHEDULE 40 (NEW MAINLINE)
1-1 1/2" SIZE. SIZE NOTED ON PLAN. INSTALL PER TRENCH
DETAIL.
5.3 L.F. F/34
EX
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
, N/35,
O/35, P/35,
Q/35, R/35
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
EXISTING MELALEUCA
PROTECT IN PLACE
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING
(LIGHT LAVENDER - STANDARD)
TREE DISPOSITION LEGEND - SHEET 30
SYMBOL DESCRIPTION
CAP & ABANDON EXISTING MAINLINE
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
REFERENCE LEGEND - SHEET 30
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 29 MATCHLINE - SEE SHEET 31 30 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY GATEWAY
CITY RIGHT OF WAY
ARTESIA BLVD GATEWAY
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 426.5 L.F.
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
IRRIGATION LEGEND - SHEET 31
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 30 MATCHLINE - SEE SHEET 32 31 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY new new new
ARTESIA BLVD SHOPPING PRIVATE CENTER DRIVEWAY
E R-03
M
M
M M M
M M M
M M M
M M M
M M M
M M M
M
M
M
M
M M M M M K K K K M M M M M M M M M M M M M M M M M exex 3 4"
M
FS
ELECTRICAL P.O.C. AT EXISTING TRAFFIC
SIGNAL CABINET (FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
PULL SHIELDED POWER CABLE THROUGH
NEW CONDUIT (FOR REFERENCE ONLY - REFER TO CIVIL PLANS) NEW PULLBOX : BROOKS PB36 PULLBOX (VERIFY TYPE).
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
BORE OR TRENCH NEW 2 INCH
SCHEDULE PVC SLEEVE
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
CONDUIT FROM NEW PULLBOX TO NEW MEDIAN PULLBOX.
BROOKS PB36 PULLBOX (VERIFY TYPE).
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
B
NEW 1-1/2" WATER METER WITH 2" SERVICE LINE
(FOR REFERENCE ONLY - REFER TO CIVIL PLANS)
8.82 B4
E 1"
9.43 B5
E 1"
D4
9.46 B6
E 1"
D5
B7 9.01
1" E
D6
B8 3.60
1" D
D7
NEW MAINLINE FROM
VALVE B5 THROUGH B8
1"
1 1
4"
M M M M
M M
M M M
M M M
K M M
K K
K K
K K K
M M M M M
K
K
PB
PB
PVC SCH. 40 - 4" SLEEVE
1 1
2"
1"
1"
3 4" 1" 1" 1" 1" 3
4" 1"
3 4"
1" 3
4"
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
R-03 EXISTING ELECTRICAL METER - PROTECT IN PLACE
REFERENCE LEGEND - SHEET 32
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI DETAIL
HUNTER MP1000 PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. M=MAROON ADJ
ARC 90 TO 210, L=LIGHT BLUE 210 TO 270 ARC, O=OLIVE 360 ARC ON PRS40 BODY.
65 40 J/35
HUNTER MP2000 PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. K=BLACK ADJ
ARC 90-210, G=GREEN ADJ ARC 210-270, R=RED 360 ARC ON
PRS40 BODY.
14 40 J/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
1 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
16 AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
552.1 S.F. K/35
MANUFACTURER/MODEL/DESCRIPTION
M L O
K G R
IRRIGATION LEGEND - SHEET 32
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING REMOTE CONTROL VALVE - NOT USED
REMOVE AND CAP
1 HUNTER ICV-G
1", 1-1/2", 2", AND 3" PLASTIC ELECTRIC REMOTE CONTROL
VALVES, GLOBE CONFIGURATION, WITH NPT THREADED
INLET/OUTLET, FOR COMMERCIAL/MUNICIPAL USE.
4 H/34
EXISTING QUICK COUPLER VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
2 S/35
NIBCO T-113
CLASS 125 BRONZE GATE SHUT OFF VALVE WITH WHEEL
HANDLE, SAME SIZE AS MAINLINE PIPE DIAMETER AT VALVE
LOCATION. SIZE RANGE - 1/4" - 3"
2 E/34
BUCKNER-SUPERIOR 3200-NXT 1"
NORMALLY CLOSED BRASS MASTER VALVE THAT PROVIDES
DIRTY WATER PROTECTION, NO MINIMUM FLOW FEATURE AND
NO EXTERNAL TUBING. AVAILABLE IN 3/4", 1", 1-1/2", 2", 2-1/2", AND 3".
1 C/34
FEBCO 825YA-LF 1-1/2"
REDUCED PRESSURE BACKFLOW PREVENTER.
BACKFLOW ENCLOSURE: VIT STRONGBOX #SBBC-30CR
ENCLOSURE SHALL BE EMBEDDED IN AN 8" THICK CONCRETE
PAD THAT EXTENDS 6" BEYOND THE SIDES AND 3` BEHIND THE
HINDGED SIDE OF ENCLOSURE. CONCRETE INSTALLATION
GRADE SHALL MATCH THE CURB HEIGHT.
1 B/34
CONTROLLER ASSEMBLY `B`
HUNTER I-CORE CONTROLLER IN STAINLESS STEEL ENCLOSURE
WITH RAIN SENSOR. SEE SHEET 38 FOR ASSEMBLY MODEL
NUMBER AND SPECIFICATIONS. AVAILABLE THROUGH GREEN
PRODUCT SALES. CONTACT DARYL GREEN (949) 584-7311. (OR
APPROVED EQUAL)
1 A/34
CST FLOW SENSOR IFS-100C
CREATIVE SENSOR TECHNOLOGY
1 D/34
PULLBOX
BROOKS PB36 PULLBOX
2 T/35
WATER METER 1-1/2"
50-150 PSI PROVIDED BY GOLDEN STATE WATER (FEB 11, 2022). 75 PSI MINIMUM REQUIRED FOR SYSTEM OPERATION.
1 B
FS
PB
M
(NEW)
, N/35,
O/35, P/35,
Q/35, R/35
P/35, Q/35,
R/35
IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
1,420 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 536.2 L.F.
IRRIGATION MAINLINE: PVC SCHEDULE 40 (NEW MAINLINE)
1-1 1/2" SIZE. SIZE NOTED ON PLAN. INSTALL PER TRENCH
DETAIL.
101.8 L.F. F/34
PIPE SLEEVE: PVC SCHEDULE 40
PIPE SLEEVE LOCATION. INSTALL A MIN. 12" BEYOND EDGE OF HARDSCAPE. SEE PLAN FOR SIZES.
64.8 L.F. F/34
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
TREES BOTANICAL / COMMON NAME
EXISTING LAGERSTROEMIA
PROTECT IN PLACE
EXISTING MELALEUCA
PROTECT IN PLACE
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING
(LIGHT LAVENDER - STANDARD)
MELALEUCA QUINQUENERVIA / CAJEPUT TREE
(SINGLE TRUNK)
TREE DISPOSITION LEGEND - SHEET 32
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING REMOTE CONTROL VALVE - NOT USED
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 31 MATCHLINE - SEE SHEET 33 32 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
CONTROLLER NOTE:
PRIOR TO START OF MAINTENANCE PERIOD,
IRRIGATION CONTROLLER SHALL BE PROGRAMMED
TO RUN OFF REAL TIME ET.
CONTROLLER ASSEMBLY - B:
CONTROLLER INSTALLED STAINLESS STEEL ENCLOSURE. PROVIDED BY GREEN PRODUCT SALES. CONTACT: DARYL GREEN 949-584-7311.
ASSEMBLY MODEL #
ICA6-HU7-18/SP/SOLSE/IFS-100C/TU3D-24/(9)3DDEC/(3)TSP/(3)GRD-K/LBR-4 CONTROLLER: HUNTER IC-1800 (ENCLOSURE MOUNT)
NUMBER OF STATIONS: 18 TOTAL (12 USED)
POWER USAGE: 120 / 240 VAC, 50 / 60 HZ.
MAX AC DRAW: 1 AMPS / 120 V - 2 AMPS / 230 V
WIRE TYPE: CONVENTIONAL
#14AWG (PILOT WIRES)
#12 AWG (COMMON WIRE)
NOTE: IF FIELD SPLICES ARE REQUIRED, PLACE IN PULL BOX PER DETAIL 'T' / SHEET 35.
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
POINT OF CONNECTION - CONTROLLER B:
WATER METER LOCATED AS SHOWN ON THE
APPROVED SEWER AND WATER PLANS PROVIDED BY
THE CIVIL ENGINEER OF RECORD
METER SIZE: 1 1/2"
SERVICE LINE SIZE: 1 1/2"
ELEVATION OF METER: - STATIC PRESSURE: 75 PSI MIN. REQUIRED PUMP REQUIRED: NO
AREA SERVED: 21,933 SF
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
CABLE NOTE: FOR COMMUNICATION BETWEEN
LOCAL DECODERS AND NEW MAIN LINE RUNS.
P-7072D PAIGE ELECTRIC COMMUNICATION
CABLE – 14 AWG/2 CONDUCTOR “MAXI” CABLE
WITH TWO TYPE UF WIRES WITH A PE OUTER
JACKET. THE COLORS OF THE OUTER JACKET
SHALL BE AS CALLED-FOR IN THE IRRIGATION
PLANS AND SPECIFICATIONS.
PAIGE PART #PRODUCT DESCRIPTION
180115 14 AWG RED JACKET
180126 14 AWG WHITE
PAIGE PART #PRODUCT DESCRIPTION
180127 14 AWG BLACK
180114 14 AWG ORANGE
180116 14 AWG BLUE
180118 14 AWG YELLOW
1801181 14 AWG PURPLE
1801182 14 AWG BROWN
1801151 14 AWG PINK
1801183 14 AWG GRAY
180117 14 AWG GREEN
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
ARTESIA BLVD SHOPPING CENTER CENTER VERMONT AVENUE PRIVATE DRIVEWAY PRIVATE DRIVEWAY E
E LIMIT OF WORK
R-01
R-03
R-02
R-03
M M M K K K K K K K K K K K K K K
K K K K K K
K K K
K K
K
K
K
K
M
M exex new new
3 4"
3 4" 3
4"
1"
3 4" 3
4"
1"
1 1
4"
B9 11.3
1" E
B10 11.0
1" E
D1
B11 1.80
1" D
D2
B12 13.2
1" A
D3
NEW MAINLINE FROM
VALVE B10 THROUGH B12
1 1
4"
1 1
4" 1"
1 1
4"
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
EXISTING STAMPED PAVING - PROTECT IN PLACE
EXISTING SIGNAGE AND (6) LIGHT FIXTURES - PROTECT IN PLACE
EXISTING ELECTRICAL METER - PROTECT IN PLACE
R-01
R-02
R-03
REFERENCE LEGEND - SHEET 33
TREES BOTANICAL / COMMON NAME
EXISTING MELALEUCA
PROTECT IN PLACE
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING
(LIGHT LAVENDER - STANDARD)
MELALEUCA QUINQUENERVIA / CAJEPUT TREE
(SINGLE TRUNK)
TREE DISPOSITION LEGEND - SHEET 33
ex EXISTING VALVE LOCATION (VALVE TO BE REPLACED)
new NEW VALVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI DETAIL
HUNTER MP1000 PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. M=MAROON ADJ
ARC 90 TO 210, L=LIGHT BLUE 210 TO 270 ARC, O=OLIVE 360 ARC ON PRS40 BODY.
5 40 J/35
HUNTER MP2000 PROS-12-PRS40-CV
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. K=BLACK ADJ
ARC 90-210, G=GREEN ADJ ARC 210-270, R=RED 360 ARC ON
PRS40 BODY.
29 40 J/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
2 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
9 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
1 L/35
RAIN BIRD ARV050
1/2" AIR RELIEF VALVE, MADE OF QUALITY RUST-PROOF
MATERIALS, WITH A 6.0" DRIP VALVE BOX (SEB 7XB EMITTER
BOX). USE WITH INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS PREVENTING
WATER HAMMER OR BLOCKAGE.
1 M/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-18
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS. AVAILABLE ONLY IN CALIFORNIA
2,979 S.F. I/34
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
276.1 S.F. K/35
M L O
K G R
IRRIGATION LEGEND - SHEET 33
, N/35,
O/35, P/35,
Q/35, R/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER ICV-G
1", 1-1/2", 2", AND 3" PLASTIC ELECTRIC REMOTE CONTROL
VALVES, GLOBE CONFIGURATION, WITH NPT THREADED
INLET/OUTLET, FOR COMMERCIAL/MUNICIPAL USE.
2 H/34
IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
801.3 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 325.4 L.F.
IRRIGATION MAINLINE: PVC SCHEDULE 40 (NEW MAINLINE)
1-1 1/2" SIZE. SIZE NOTED ON PLAN. INSTALL PER TRENCH
DETAIL.
259.9 L.F. F/34
PIPE SLEEVE: PVC SCHEDULE 40
PIPE SLEEVE LOCATION. INSTALL A MIN. 12" BEYOND EDGE OF HARDSCAPE. SEE PLAN FOR SIZES.
13.9 L.F. F/34
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
, N/35,
O/35, P/35,
Q/35, R/35
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 32
33 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE: DRAWING IS DIAGRAMMATIC
FOR DESIGN CLARIFICATION ONLY.
LANDSCAPE IRRIGATION PLAN
NOTE:
FOR COMPLETE IRRIGATION LEGEND, SEE SHEET 36.
FOR IRRIGATION DETAILS, SEE SHEETS 34 THROUGH 35.
FOR IRRIGATION CALCS, SCHEDULE & NOTES, SEE SHEET 36.
NOTES:
· IF EXISTING LOCATION AND DECODER IS ASSIGNED, CONTRACTOR
TO UTILIZE EXISTING CONTROL AND COMMON WIRE AND RUN A NEW TWO-WIRE CABLE TO NEW VALVES IDENTIFIED.
· CONTRACTOR SHALL TEST EACH PAIR OF WIRES (COMMON &
CONTROL) FOR EACH VALVE FROM CONTROLLER TO VALVE TO
CONFIRM WIRE INTEGRITY WITH DECODER INSTALLATION.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
REMOTE CONTROL VALVE
SCALE: N.T.S 2" 2" CLEAR
1 2 3
4 5
6 7
10 8 9
11 12 14 13
15 17 16
SECTION
1 CONTROL VALVE
2 FINISH GRADE OF TURF
3 FINISH GRADE OF SHRUB AREA
3M DBY-6 DIRECT BURY SPLICE KIT W/
SCOTCHLOK SPRING CONNECTORS
4 5 PVC SCH 80 ELL
PVC SCH 80 MAIL ADAPTER (TWO
REQUIRED)
6 7 PVC SCH 80 NIPPLE
8 CHRISTY VALVE SEQUENCE TAG
9 MULCH BED
PLASTIC RECTANGULAR VALVE BOX WITH
BOLT DOWN COVER, USE STAINLESS BOLT,
NUT AND WASHER. BOX TO BE PLACED AT
RIGHT ANGLE TO HARDSCAPE EDGE.
HEAT BRAND "RCV" AND CONTROL
STATION # ONTO LID
10 11 ONE CUBIC FT. CRUSHED ROCK
12 P.V.C. MAINLINE
13 P.V.C. SCH 80 TEE
14 COMMON AND CONTROL WIRES
15 24" MIN. EXPANSION LOOP
16 SCH 80 UNION (SxS)
17 FILTER FABRIC
H
TYPICAL DRIP LINE SYSTEM LAYOUT
SCALE: 1" = 1" PLAN
NOTE:
TRIANGULAR SPACE
EMITTERS AS SHOWN
BELOW
2 4
6 1 3 7
8 9
F
A 2" MIN. 4" MAX
8 6
1 4
5 2" MIN. 12" MIN. 4" MIN.
2 3
4 7
7 2" MIN. 4" MIN.
TO LATERAL
TO AIR RELIEF /
FLUSH VALVE
TO AIR RELIEF / FLUSH
VALVE / LATERAL
TYPICAL DRIPLINE SECTION
PVC LATERAL TO SUPPLY HEADER PIPE TRANSITION FROM SUPPLY HEADER TO DRIP TUBING 1 2
10 11
12 13 15 1 14
16 1 10 11
2 17
13 15
16 PRESSURE-COMPENSATING IN-LINE EMITTER TUBING: SEE
LEGEND
1 2 PVC SUPPLY HEADER
PVC RISER FROM 12" LATERAL TO 4" SUPPLY HEADER - SEE
DETAIL, THIS SHEET
3 PIPE TRANSITION POINT FROM PVC HEADER TO EMITTER
TUBING
4 6 PVC MAINLINE - SEE PLAN
7 XERIGATION CONTROL VALVE - SEE LEGEND
8 FLUSH VALVE AT LOW POINT OF SYSTEM - SEE LEGEND
AIR RELIEVE VALVE AT HIGH POINT OF SYSTEM - SEE
LEGEND
9 10 ½" COMP X ¾" MPT ADAPTER
11 SCH 40 PVC TEE (SxSxT)
12 BARB x BARB TEE
13 TOP OF MULCH (SEE SPECS)
14 TIE DOWN STAKE @ 6'-0" O.C. AND AT BENDS AND ENDS.
15 FINISHED GRADE
16 TOP SOIL COVER
17 PVC SCH 40
I
BALL OR GATE VALVE 2 1/2" OR LESS
SCALE: N.T.S. SECTION 18" MIN. 4" MIN.
NOTE:
INSTALL VALVE BOX SO THAT TOP OF COVER IS 2" ABOVE FINISH GRADE IN GROUND COVER AREAS AND ½" IN TURF AREAS
1 1 FINISH GRADE
2 3
RECTANGULAR PLASTIC
VALVE BOX, W/ LOCKING
COVER BRANDED "GV"
3 4
UNION BALL VALVE -
REFER TO LEGEND (socket
& FIPT thread end
connectors)
4 5
5 PVC MAIN LINE
6 6
PVC MALE ADAPTER (2
REQUIRED)
7 ONE CUBIC FOOT ¾"
CRUSHED ROCK
8 7
8" DIA. CL. 160 PVC
SLEEVE W/ FLARED
BOTTOM CONTACTING
SUPPLY LINE
8 2
FILTER FABRIC
E
A
A
A
PIPE SLEEVING AND TRENCHING
SCALE: N.T.S. SECTION
SAND BACKFILL
SCH. 40 P.V.C. OR SCH 80,
SEE NOTES ABOVE, 2X
LINE SIZE
CONTROL WIRES USE
SEPARATE P.V.C. SCH 40
SLEEVE UNDER ALL
PAVING 2 ½" MIN.
MAINLINE
MAIN LINE
CONTROL WIRES
TAPED AT 10'
INTERVALS BELOW
MAINLINE
MAIN LINE AND CONTROL WIRES IN
AVERAGE SOIL CONDITIONS
DIMENSION (PIPE)
UP TO 2 1/2" SIZE
3" - 5 1/2" SIZE
A
18"
24"
MAIN LINE & CONTROL
WIRES UNDER PAVING
DIMENSION A B
24" 4"
LATERAL PIPES
DIMENSION
ALL HEADS (UNLESS
OTHERWISE SPEC'D)
A
12"
FINISH SURFACE
PAVING
SUBBASE
FINISH GRADE
FINISH GRADE
LATERAL LINESEE SECTION 'B'
FOR UNDER
PAVING
CONDITION.
SECTION C
SECTION A
SECTION B
NOTE: TRENCHES TO BE WIDE ENOUGH TO ALLOW 4" MIN. HORIZONTAL CLEARANCE BETWEEN PARALLEL PIPES. COMPACT TRENCH BACKFILL TO COMPACTION SAME AS ADJACENT AREAS AND TO 90% COMPACTION IN PAVED AREAS.
'A' IS MEASURED BELOW
AGGREGATE BASE OF
PAVING
SECTION A SECTION B
SECTION C
B B
B
6" SIZE or GREATER 24"
SLEEVES UNDER ROADS / PAVING:
6" DIA OR LESS 36" COVER
GREATER THAN 6" 48" COVER
SCH 80 PVC
SLEEVES UNDER PAVING(NON-ROAD)
LESS THAN 3" DIA. 18" COVER
3" - 5 1/2" 24" COVER
6" OR GREATER 36" COVER
SCH 40 PVC
WARNING TAPE -
SEE NOTE BELOW 12"
F
XERIGATION CONTROL ZONE KIT - LT. COMMERCIAL
SCALE: N.T.S. SECTION
NOTE:
VALVE BOX LIDS SHALL BE BRANDED WITH ABBREVIATED INITIALS FOR EACH DEVICE 1 2
3 4 6 8 1
11 12
18 10
19 5 17 7 16 9
13 14 15
1 FINISH GRADE / TOP OF MULCH
2 VALVE BOX WITH COVER: JUMBO SIZE HEAT BRAND 'RCV' AND CONTROLLER STATION # ONTO LID. 3 30-INCH LINEAR LENGTH OF WIRE, COILED
WATER PROOF CONNECTOR: USE 3M DBY-6 DIRECT BURY SPLICE KIT (SKOTCH LOK CONNECTOR W/ GEL
FILLED POLYPROPYLENE TUBE)
4 5 FILTER FABRIC
6 CHRISTY ID TAG
7 REMOTE CONTROL VALVE (INCLUDED ON CONTROL ZONE KIT) SEE PLAN FOR SIZE. 8 PRESSURE REGULATING QUICK CHECK BASKET FILTER (INCLUDED IN CONTROL ZONE KIT) 9 PVC SCH 40 FEMALE ADAPTOR
10 LATERAL PIPE (TO SYSTEM)
11 PVC SCH 80 NIPPLE (2-INCH LENGTH, HIDDEN) AND PVC SCH 40 ELL 12 PVC SCH 80 ELL
13 PVC SCH 80 NIPPLE (2-INCH LENGTH, HIDDEN) AND PVC SCH 40 ELL 14 PVC SCH 80 TEE OR ELL
15 MAINLINE PIPE
16 3-INCH MIN. DEPTH OF 3/4-INCH WASHED GRAVEL
17 PVC SCH 80 NIPPLE, CLOSE (INCLUDED IN CONTROL ZONE KIT) 18 PVC UNION
19 BRICK (1 OF 4)
G
REDUCE PRESSURE BACKFLOW PREVENTER
SCALE: N.T.S. VIEW
NOTES:
1. INSTALLATION MUST CONFORM TO
LOCAL CODES
2. CONTRACTOR MUST PROVIDE
BACKFLOW CERTIFICATION
3. LOCATE BACKFLOW IN PLANTER
WHERE POSSIBLE
4. PROVIDE HASP W/ MASTER #2526
PADLOCK 4" 3" 12" MIN.
1 2
3 4
5 6
7 8
10 9
11 12
13 14
15 16
17 1 QUICKPAD FASTENING BRACKET (2)
2 BRASS ELL 90
3 POLAR BEAR COVER (IF SPECIFIED)
V.I.T. STRONGBOX SBBC SERIES
ENCLOSURE PER LEGEND & SPECS
4 BACKFLOW PREVENTER PER LEGEND
& SPECS
5 BRASS NIPPLE LINE SIZE TYP. X 6"
LONG MIN.
6 PRESSURE REGULATOR PER
IRRIGATION LEGEND (IF SPECIFIED)
7 8 FILL INSIDE BASE WITH PEA GRAVEL
9 SCH 80 PVC TO MASTER VALVE
10 SCH 80 FEMALE ADAPTER
11 BRASS NIPPLE
NATIVE SOIL COMPACTED TO
ORIGINAL DENSITY
12 V.I.T. STRONGBOX QUICKPAD - 3/16"
MIN. THICKNESS ALUMINUM POWDER
COATED PREFORMED PAD - MODEL
#QP-30BF
13 14 SCH 80 PVC TO METER
15 BALL VALVE
V.I.T. STRONGBOX QUICKPAD
SUPPORT BASE - MODEL #QP-30BF
16 17 FINISH GRADE
B 4" CLR. MIN. 2" CLR
NOTE: DO NOT CUT ADDITIONAL HOLES IN BOX.
TO FLOW SENSOR
MASTER VALVE TO FLOW SENSOR
SCALE: N.T.S. SECTION
1 2 3 4
5 6
7 8
9 7
10 11
12 1 MASTER CONTROL VALVE
2 FINISH GRADE
JUMBO PLASTIC VALVE BOX - W/ LOCKING COVER
BRANDED 'MV' ON COVER
3 4 '3m DBY-6' ELECTRICAL CONNECTORS
5 PVC MALE ADAPTER - (2) REQ.
6 PVC SCH. 80 - 45° ELL - (2) REQ.
7 SCH 80 SUPPLY LINE SECTION
8 1-1/2 CUBIC FT. CRUSHED ROCK
COMMON & CONTROL WIRES BACK TO
CONTROLLER IN CONDUIT (LMD ONLY)
9 10 24" MIN. EXPANSION LOOP
11 FILTER FABRIC
12 CHRISTY ID TAG (ID-MAX-P-2-RC-006)
C
10 PIPE DIA 5 PIPE DIA
FLOW SENSOR TO MASTER VALVE
SCALE: N.T.S. SECTION
1 2
3 4
5 6
8 7
9 10
11 12 1" IN TURF AREAS 2" IN SHRUB AREAS4" CLR. 2" CLR. 1 FINISH GRADE
2 1" ELECTRICAL CONDUIT & SWEEP ELLS
PLASTIC VALVE BOX, W/ LOCKING COVER. HEAT
BRAND "FS" ONTO COVER
3 FLOW SENSOR - SEE LEGEND FOR
SPECIFICATIONS
4 PVC MAIN LINE TO MASTER VALVE. LENGTH PER
SPECS AND PLAN.
5 6 PVC MALE ADAPTER (2 REQ.)
7 TWO CUBIC FOOT ¾" CRUSHED ROCK
8 FILTER FABRIC
BELDEN #9883 CABLE (SENSOR LEADS TO DATA
RECORDER)
9 10 CONDUIT BUSHING
3M DBY-6 DIRECT BURY SPLICE KIT W/ SKOTCHLOK
SPRING CONNECTORS
11 12 PVC MAINLINE PIPE PER SPECIFICATION
13 13 PVC SCH. 80 - 45° ELL- (2) REQUIRED
D
* NOTE ALL GROUNDING REQUIREMENTS FOR CONTROLLER
ASSEMBLIES SHALL CONFORM TO LOCAL ELECTRICAL CODES.
IMPERIAL ASSEMBLY WITH CONCRETE BASE
13 REMOTE
25 26
27 28
29 30
31 32
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
IMPERIAL
10748-001 ASSW1 W2 J2
1 3 37 20 TB2 TB1 J3
1 12 J 4
1 12 J 1 J 4 1
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48 W1 W2 TB2 TB1 J2
1 12 J 3
1 12
FS(RED)
FS(BLK) 24 VAC
RSRS
TW
TW
PUMP MV(HOT) MV COM
COM
COM
1 2
3 4
5 6
7 8
9 10
11 12 37 20 J 1 J 4 1 W3 J 4
1 12 TB3
13 14
15 16
17 18
19 20
21 22
23 24
BYPASS SLAVE HOT COM
IMPERIAL
10T24-001 ASS K1 F1 TB4 SW1 2'-0"
6"
MIN. 12" 38"
16"
1 2
3 4
5 6 7
8 9
10 12
14 CONTROLLER ASSEMBLY TOP ENTRY (ICA6 SERIES)
SCALE: NTS SECTION / ELEVATION
11 IMPERIAL ASSEMBLIES 16" TOP ENTRY
SATELLITE ASSEMBLY NEMA 3R RAINPROOF
ENCLOSURE (UL LISTED)
1 2 CONTROLLER
3 POWER SWITCH/GFI RECEPTACLE
MASTER VALVE RELAY ASSEMBLY OR PUMP
START RELAY ASSEMBLY (OPTIONAL)
4 5 TERMINAL BOARD
6 REMOTE RECEIVER CONNECTOR
1" PVC CONDUIT FOR 120 VAC FROM METERED
POWER SUPPLY
7 PVC CONDUIT FOR CONTROL WIRES, SIZE AS
REQUIRED
8 9 FILL VOIDS WITH 3/8" PEA GRAVEL
1-1/4" PVC CONDUIT FOR FLOW SENSOR CABLE
PAIGE CABLE P - 7162 - D
10 11 SOLAR SYNC (ET AND RAIN SENSOR)
12 POURED CONCRETE BASE
FINISH SURFACE - REFER TO PRECISE
GRADING PLAN
13 14 COMPACTED SUB-GRADE
A
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
08/09/2023
08/09/2023
34 8-1059
IRRIGATION DETAILS
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
PULL BOX
SCALE: N.T.S. SECTION
1 2
3 4
6 5
7 8
1 FINISH GRADE
RECTANGULAR VALVE BOX
REFER TO SPECIFICATIONS.
BRAND LID "PB"
2 24" MIN. SLACK CONTROL
AND/OR COMMON WIRE,
REFER TO SPECS.
3 CRUSHED ROCK BACKFILL
(ONE CUBIC FOOT MINIMUM)
4 5 FILTER FABRIC
1 1/4" SCH 80 SWEEP ELL
CONDUIT
6 UL LISTED PVC SCH 80
CONDUIT
7 UL LISTED PVC SCH 80 SXS
COUPLING
8 T
QUICK COUPLER
SCALE: N.T.S. SECTION 4" MIN. 3"
NOTE:
TEFLON TAPE ALL CONNECTIONS
1 2
3 4
5 6
7 8
9 10
11 12
13 1 FINISH GRADE IN TURF AREAS
PLASTIC ROUND VALVE BOX WITH
BOLT DOWN COVER, USE STAINLESS
BOLT NUT AND WASHER. HEAT
BRAND "QC" ONTO LID. SEE LEGEND
/ SPECS FOR BOX COLOR
2 QUICK COUPLER KEY WITH MALE
HOSE BIB CONNECTION AS SHOWN,
KEY MUST CLEAR VALVE BOX
3 4 FINISH GRADE IN SHRUB AREAS
QUICK COUPLER VALVE SEE LEGEND
FOR SPEC.
5 STAINLESS PUNCH LOK CLAMPS (2
REQ.)
6 7 BRASS NIPPLE (LENGTH AS REQ.)
BRASS TRIPLE SWING JOINT (SIZE
PER QCV USE TWO BRASS STREET ELLS, ONE
THREADED ELL FORASSEMBLY
8 9 MAINLINE (SEE LEGEND/SPECS.)
10 #4 x 36" REBAR STAKE
11 LANDSCAPE FILTER FABRIC
12 3/4" ROCK, 1 CUBIC FT
13 SCH 80 TEE (SXSXT)
S
24V MV FS C ? ? ? ? ? ? ? ?
A B C D
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425 26
N/A N/A N/A A1
LEGEND
EXITING ZONE CONTROL VALVE
EXISTING COMMON WIRE
EXISTING CONTROL WIRE
TUCOR WIRE (TWO- WIRE PATH)
DECODER WIRES
JUMPER WIRES
A1
TU3DDEC DECODER
CONTROLLER
3-D
A2
NEW ZONE CONTROL VALVE
A2
ADDING VALVES TO EXISTING WIRES (A1 & A2)
SCALE: N.T.S. HYBRID 3D - ADDING VALVES TO EXISTING SYSTEM NLC-3D WIRING SCHEMATIC
D
D D
O
24V MV FS C ? ? ? ? ? ? ? ?
A B C D
1 2 3 4 5 6 7 8 9 10 111213141516171819202122232425 26
N/A N/A N/A B2
LEGEND
EXITING ZONE CONTROL VALVE
EXISTING COMMON WIRE
EXISTING CONTROL WIRE
TUCOR WIRE (TWO- WIRE PATH)
DECODER WIRES
JUMPER WIRES
B1
TU3DDEC DECODER
CONTROLLER
3-D
B3
NEW ZONE CONTROL VALVE
B2
ADDING VALVES TO EXISTING WIRES (B2 & B3)
SCALE: N.T.S. HYBRID 3D - ADDING VALVES TO EXISTING SYSTEM NLC-3D WIRING SCHEMATIC
P
D D
D
24V MV FS C ? ? ? ? ? ? ? ?
A B C D
1 2 3 4 5 6 7 8 9 10 111213141516171819202122232425 26
B5 N/A N/A N/A
LEGEND
EXITING ZONE CONTROL VALVE
EXISTING COMMON WIRE
EXISTING CONTROL WIRE
TUCOR WIRE (TWO- WIRE PATH)
DECODER WIRES
JUMPER WIRES
B5
TU3DDEC DECODER
CONTROLLER
3-D
NEW ZONE CONTROL VALVE
B6-8
B8 B7 B6
ADDING VALVES TO EXISTING WIRES (B5 TO B8)
SCALE: N.T.S. HYBRID 3D - ADDING VALVES TO EXISTING SYSTEM NLC-3D WIRING SCHEMATIC
Q
D
D
D D
D
24V MV FS C ? ? ? ? ? ? ? ?
A B C D
1 2 3 4 5 6 7 8 9 10111213141516171819202122232425 26
B10 N/A N/A N/A
LEGEND
EXITING ZONE CONTROL VALVE
EXISTING COMMON WIRE
EXISTING CONTROL WIRE
TUCOR WIRE (TWO- WIRE PATH)
DECODER WIRES
JUMPER WIRES
B10
TU3DDEC DECODER
CONTROLLER
3-D
NEW ZONE CONTROL VALVE
B11-12
B12 B11
ADDING VALVES TO EXISTING WIRES (B10 TO B12)
SCALE: N.T.S. HYBRID 3D - ADDING VALVES TO EXISTING SYSTEM NLC-3D WIRING SCHEMATIC
R
D
D D
D
2 WIRE DECODER IN VALVE BOX
SCALE: N.T.S. SECTION
FLOW
1. STRIP WIRES 1/2" TO 5/8". USING LINEMANS PLIERS OR OTHER STYLE TOOL, TWIST ENDS TOGETHER MIN 3
TIMES. INSERT INTO SCOTCHLOK ELECTRICAL CONNECTOR AND ROTATE CLOCKWISE UNTIL ADDITIONAL FORCE IS REQUIRED.
2. INSERT THE SPLICE INTO THE GEL-FILLED INSULATOR
TUBE. PUSH PAST THE LOCKING FINGERS TO HOLD THE SCOTHLOK CONNECTOR IN PLACE.
3. POSITION WIRE CHANNELS AND SNAP INSULATOR
TUBE COVER CLOSED.
* WIRE CONNECTORS INCLDED WITH DECODERS*
WIRE SPLICE STEPS
1 2
3 4
5 6
7 8
10 9
11 12
13 14
15 VALVE BOX. REFER TO SPECS. SIZE
AS REQUIRED.
1 2 FINISH GRADE
3 MULCH. REFER TO SPECS.
TWO-WIRE CABLE FROM
CONTROLLER, TO NEXT VALVE AND
FEEDING DECODER.
4 3M DBR/Y SPLICE KIT WIRE
CONNECTOR: (1 OF 2)
5 WIRES FROM DECODER TO THE
VALVE SOLENOID.
6 7 TWO-WIRE DECODER
I.D. TAG WITH STATION NUMBER
PRINTED ON IT (CHRISTY'S
#ID-STD-Y1)
8 9 90% COMPACTED NATIVE
12-INCH MINIMUM DEPTH OF 3/4-INCH
WASHED GRAVEL OVER FILTER
FABRIC
10 11 BRICK SUPPORT (1 OF 4)
1.25" MIN SCH. 40 ELECTRICAL
CONDUIT. (IF REQ.)
ADJUST SIZE AS REQUIRED.
12 MAINLINE INTO VALVE. REFER TO
PLAN.
13 14 REMOTE CONTROL VALVE. PER PLAN.
TWO-WIRE CABLE (PER
MANUFACTURER). LOOP 24" MIN.
EXTRA WIRE AROUND PERIMETER OF
BOX.
15 N
LAWN / SHRUB POP-UP (TRIPLE SWING JOINT)
SCALE: N.T.S. SECTION
NOTE:
CONTRACTOR MAY USE PRE-FABRICATED TRIPLE SWING
JOINT ASSEMBLY AS APPROVED BY THE LANDSCAPE
ARCHITECT 12" COVER
NOTE:
TEFLON TAPE ALL CONNECTIONS
1 2
3 4
5 6
7 8
1 FINISH GRADE
2 POP-UP SPRAY HEAD
SCH 40 P.V.C. S x S x T FITTING LATERAL x
SPRINKLER INLET SIZE
3 4 P.V.C. SCH 80 NIPPLE
5 TEFLON TAPE THREADS
6 P.V.C. LATERAL
PRE-ASSEMBLED SWING JOINT WITH TWO
POLY ELLS (THREADED x INSERT) AND 6"
POLY TUBING. SIZE PER SPRINKLER
OUTLET.
7 8 HARDSCAPE
18"
J
DRIPLINE TREE RING INSTALLATION (RECLAIMED)
SCALE: 1" = 1" VIEW
NOTES:
1. INNER RING IS 3' DIA. OUTSIDE RING IS 4'-6" DIA.
2. PLACE TIE DOWN STAKES EVERY THREE FEET IN SAND, F0UR FEET IN LOAM, AND FIVE FEET IN CLAY.
3. AT FITTINGS WHERE THERE IS A CHANGE OF DIRECTION SUCH AS TEES OR ELBOWS, USE TIE-DOWN STAKES ON EACH LEG.
1 2
3 3
3 4
5 5
6 7
8 5
9 1 1/2" POLY ETHYLENE BLANK TUBING
2 COMPRESSION FITTING TEE
3 1/2" POLYETHYLENE BLANK TUBING
BARB CROSS INSERT FITTING:
RAIN BIRD XFD-CROSS
4 BARB TEE INSERT FITTING:
RAIN BIRD XFF-TEE
5 6 SEE NOTE #1 BELOW
SUB-SURFACE DRIPLINE:
PLACE AS SHOWN
(LENGTH AS REQUIRED)
7 8 ROOT BALL
TIE DOWN STAKE:
QUANTITY AS REQUIRED
SEE NOTES 2-3 BELOW)
9 K
MANUAL FLUSH CAP CONNECT TO PVC HEADER
SCALE: N.T.S. VIEW
NOTE:
ALLOW A MIN. OF 6-INCHES OF
DRIPLINE TUBING IN BOX IN ORDER
TO DIRECT FLUSHED WATER OUTSIDE
VALVE BOX.
1 2
3 4
5 6
7 8
9 1 TOP SOIL COVER
2 TOP OF MULCH (SEE SPECS)
7-INCH VALVE BOX
RAIN BIRD SEB-7XB
3 4 RAINBIRD 'MDCFP' FLUSH CAP
5 RAINBIRD 'MDCFCOUP' COUPLING
'BLANK' LANDSCAPE DRIPLINE
TUBING
6 7 BRICK (1 OF 2)
3-INCH MINIMUM DEPTH OF 3/4-INCH
WASHED GRAVEL
8 RAINBIRD 'MDMPT' ADAPTER FROM
PVC TO COUPLER
9 L
AIR RELIEF CONNECT TO PVC HEADER
SCALE: N.T.S. VIEW
1 2
3 4
5 6
7 1 TOP OF MULCH
2 SUBTERRANEAN EMITTER BOX
AIR RELIEF VALVE KIT:
SEE LEGEND/SPECS
3 4 FINISH GRADE
3" MINIMUM DEPTH OF ¾" WASHED
GRAVEL
5 PVC HEADER - SEE TYPICAL
DRIPLINE SYSTEM DETAIL, THIS
SHEET
6 7 PVC SCH 40 TEE SxSxT
M
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
08/09/2023
08/09/2023
35 8-1059
IRRIGATION DETAILS
CABLE NOTE: FOR COMMUNICATION BETWEEN
LOCAL DECODERS AND NEW MAIN LINE RUNS.
P-7072D PAIGE ELECTRIC COMMUNICATION
CABLE – 14 AWG/2 CONDUCTOR “MAXI” CABLE
WITH TWO TYPE UF WIRES WITH A PE OUTER
JACKET. THE COLORS OF THE OUTER JACKET
SHALL BE AS CALLED-FOR IN THE IRRIGATION
PLANS AND SPECIFICATIONS.
PAIGE PART #PRODUCT DESCRIPTION
180115 14 AWG RED JACKET
180126 14 AWG WHITE
PAIGE PART #PRODUCT DESCRIPTION
180127 14 AWG BLACK
180114 14 AWG ORANGE
180116 14 AWG BLUE
180118 14 AWG YELLOW
1801181 14 AWG PURPLE
1801182 14 AWG BROWN
1801151 14 AWG PINK
1801183 14 AWG GRAY
180117 14 AWG GREEN
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
NUMBER MODEL SIZE TYPE GPM PSI PSI @ POC PRECIP
A1 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 3.18 40.06 56.69 0.43 in/h A2 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 0.27 40.01 51.1 0.7 in/h A3 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 7.32 41.17 71.17 0.43 in/h A4 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 0.27 40.01 51.09 0.65 in/h A5 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 4.09 40.19 56.09 0.43 in/h A6 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 0.45 40.01 51.1 0.63 in/h A7 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 6.75 41.13 60.54 0.43 in/h A8 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 9.31 42.98 54.88 0.43 in/h A9 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 0.45 40.01 51.05 0.63 in/h A10 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 1.58 40.05 51.25 0.63 in/h A11 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 11.33 43.23 61.46 0.43 in/h B1 HUNTER ICV-G 1" SHRUB ROTARY 11.24 45.38 68.73 0.3 in/h B2 HUNTER ICV-G 1" SHRUB ROTARY 11.36 45.38 69.06 0.3 in/h B3 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 1.35 40.06 51.43 0.63 in/h B4 HUNTER ICV-G 1" SHRUB ROTARY 8.82 48.37 61.79 0.27 in/h B5 HUNTER ICV-G 1" SHRUB ROTARY 9.43 48.24 62.16 0.36 in/h B6 HUNTER ICV-G 1" SHRUB ROTARY 9.46 48.59 62.65 0.27 in/h B7 HUNTER ICV-G 1" SHRUB ROTARY 9.01 48.45 62.37 0.36 in/h B8 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 3.60 40.58 52.19 0.63 in/h B9 HUNTER ICV-G 1" SHRUB ROTARY 11.32 44.96 62.5 0.23 in/h B10 HUNTER ICV-G 1" SHRUB ROTARY 11.04 45.78 63.35 0.22 in/h B11 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 1.80 40.11 51.81 0.63 in/h B12 HUNTER PCZ-101-25 1" AREA FOR DRIPLINE 13.24 44.68 67.24 0.43 in/h Unknown EXISTING REMOTE CONTROL VALVE - NOT USED 13.04 Unknown
VALVE SCHEDULE
TREE DRIPLINE
TREE DRIPLINE
TREE DRIPLINE
TREE DRIPLINE
TREE DRIPLINE
TREE DRIPLINE
TREE DRIPLINE
TREE DRIPLINE
CRITICAL ANALYSIS
Generated: 2022-05-16 14:04
P.O.C. NUMBER: NEW WATER METER (M)
Water Source Information:
50-150 PSI PROVIDED BY GOLDEN STATE WATER (FEB 11, 2022). 75 PSI MINIMUM REQUIRED FOR SYSTEM OPERATION.
FLOW AVAILABLE
Water Meter Size: 1-1/2"
Flow Available 75 GPM
PRESSURE AVAILABLE
Static Pressure at POC: 75.00 PSI
Elevation Change: 5.00 ft
Service Line Size: 2"
Length of Service Line: 20 ft
Pressure Available: 72.00 psi
DESIGN ANALYSIS
Maximum Station Flow: 13.24 GPM
Flow Available at POC: 75 GPM
Residual Flow Available: 61.76 GPM
Critical Station: B2
Design Pressure: 40 PSI
Friction Loss: 2.17 PSI
Fittings Loss: 0.22 PSI
Elevation Loss: 0 PSI
Loss through Valve: 3 PSI
Pressure Req. at Critical Station: 45.4 PSI
Loss for Fittings: 1.04 PSI
Loss for Main Line: 10.41 PSI
Loss for POC to Valve Elevation: 0 PSI
Loss for Backflow: 11.07 PSI
Loss for Master Valve: 0.95 PSI
Loss for Water Meter: 0.19 PSI
Critical Station Pressure at POC: 69.06 PSI
Pressure Available: 72 PSI
Residual Pressure Available: 2.94 PSI
Generated: 2022-05-16 14:03
P.O.C. NUMBER: EXISTING WATER METER (EX-POC)
Water Source Information:
50-150 PSI PROVIDED BY GOLDEN STATE WATER (FEB 11, 2022). 75 PSI MINIMUM REQUIRED FOR SYSTEM OPERATION.
FLOW AVAILABLE
Point of Connection Size: 1 1/2"
Flow Available 46.59 GPM
PRESSURE AVAILABLE
Static Pressure at POC: 75.00 PSI
Pressure Available: 75.00 psi
DESIGN ANALYSIS
Maximum Station Flow: 11.33 GPM
Flow Available at POC: 46.59 GPM
Residual Flow Available: 35.26 GPM
Critical Station: A3
Design Pressure: 30 PSI
Friction Loss: 0.22 PSI
Fittings Loss: 0.02 PSI
Elevation Loss: 0 PSI
Loss through Valve: 10.93 PSI
Pressure Req. at Critical Station: 41.17 PSI
Loss for Fittings: 1.69 PSI
Loss for Main Line: 16.88 PSI
Loss for POC to Valve Elevation: 0 PSI
Loss for Backflow: 11 PSI
Loss for Master Valve: 0.43 PSI
Critical Station Pressure at POC: 71.17 PSI
Pressure Available: 75 PSI
Residual Pressure Available: 3.83 PSI
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER MP CORNER PROS-12-PRS40-CV T
SHRUB ROTATOR, 12" POP-UP WITH FACTORY INSTALLED CHECK
VALVE, PRESSURE REGULATED TO 40 PSI, MP ROTATOR NOZZLE.
T=TURQUOISE ADJ ARC 45-105 ON PRS40 BODY.
1 J/35
HUNTER MP1000 PROS-12-PRS40-CV M
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. M=MAROON ADJ
ARC 90 TO 210, L=LIGHT BLUE 210 TO 270 ARC, O=OLIVE 360 ARC ON PRS40 BODY.
100 J/35
HUNTER MP2000 PROS-12-PRS40-CV K
SHRUB ROTATOR, 12" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE. K=BLACK ADJ
ARC 90-210, G=GREEN ADJ ARC 210-270, R=RED 360 ARC ON
PRS40 BODY.
57 J/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
HUNTER PCZ-101-25
DRIP CONTROL VALVE KIT. 1" PGV GLOBE VALVE WITH 1" HY100 FILTER SYSTEM. PRESSURE REGULATION: . FLOW RANGE: 0.5
GPM TO 15 GPM. 150 MESH STAINLESS STEEL SCREEN.
15 G/34
PIPE TRANSITION POINT ABOVE GRADE
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP TUBING
WITH RISER TO ABOVE GRADE INSTALLATION.
58 RAIN BIRD MDCFCAP
DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING
COUPLER.
11 L/35
RAIN BIRD ARV050
1/2" AIR RELIEF VALVE, MADE OF QUALITY RUST-PROOF
MATERIALS, WITH A 6.0" DRIP VALVE BOX (SEB 7XB EMITTER
BOX). USE WITH INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS PREVENTING
WATER HAMMER OR BLOCKAGE.
7 M/35
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-18
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS. AVAILABLE ONLY IN CALIFORNIA
12,530 S.F. I/34
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-09-18 (TREE DRIPLINE RING)
XFS-CV SUB-SURFACE LANDSCAPE DRIPLINE WITH A
HEAVY-DUTY 4.3 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. SPECIFY XF INSERT
FITTINGS.
1,492 S.F. K/35
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
EXISTING REMOTE CONTROL VALVE - NOT USED
REMOVE AND CAP
6 HUNTER ICV-G
1", 1-1/2", 2", AND 3" PLASTIC ELECTRIC REMOTE CONTROL
VALVES, GLOBE CONFIGURATION, WITH NPT THREADED
INLET/OUTLET, FOR COMMERCIAL/MUNICIPAL USE.
8 H/34
EXISTING QUICK COUPLER VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
15 S/35
EXISTING BALL VALVE
PROTECT IN PLACE / RENOVATE ONLY PER DETAIL
6 NIBCO T-113
CLASS 125 BRONZE GATE SHUT OFF VALVE WITH WHEEL
HANDLE, SAME SIZE AS MAINLINE PIPE DIAMETER AT VALVE
LOCATION. SIZE RANGE - 1/4" - 3"
2 E/34
BUCKNER-SUPERIOR 3200-NXT 1"
NORMALLY CLOSED BRASS MASTER VALVE THAT PROVIDES
DIRTY WATER PROTECTION, NO MINIMUM FLOW FEATURE AND
NO EXTERNAL TUBING. AVAILABLE IN 3/4", 1", 1-1/2", 2", 2-1/2", AND 3".
2 C/34
EXISTING - PROTECT IN PLACE: FEBCO 1-1/2"
REDUCED PRESSURE BACKFLOW PREVENTER
1 B/34
EXISTING BACKFLOW PREVENTER 3/4"
PROTECT-IN-PLACE
1 FEBCO 825YA-LF 1-1/2"
REDUCED PRESSURE BACKFLOW PREVENTER.
BACKFLOW ENCLOSURE: VIT STRONGBOX #SBBC-30CR
ENCLOSURE SHALL BE EMBEDDED IN AN 8" THICK CONCRETE
PAD THAT EXTENDS 6" BEYOND THE SIDES AND 3` BEHIND THE
HINDGED SIDE OF ENCLOSURE. CONCRETE INSTALLATION
GRADE SHALL MATCH THE CURB HEIGHT.
1 B/34
CONTROLLER ASSEMBLY `A`
HUNTER I-CORE CONTROLLER IN STAINLESS STEEL ENCLOSURE
WITH RAIN SENSOR. SEE SHEET 33 FOR ASSEMBLY MODEL
NUMBER AND SPECIFICATIONS. AVAILABLE THROUGH GREEN
PRODUCT SALES. CONTACT DARYL GREEN (949) 584-7311. (OR
APPROVED EQUAL)
1 A/34
CONTROLLER ASSEMBLY `B`
HUNTER I-CORE CONTROLLER IN STAINLESS STEEL ENCLOSURE
WITH RAIN SENSOR. SEE SHEET 38 FOR ASSEMBLY MODEL
NUMBER AND SPECIFICATIONS. AVAILABLE THROUGH GREEN
PRODUCT SALES. CONTACT DARYL GREEN (949) 584-7311. (OR
APPROVED EQUAL)
1 A/34
EXISTING IRRIGATION CONTROLLER
PROTECT-IN-PLACE
1 CST FLOW SENSOR IFS-100C
CREATIVE SENSOR TECHNOLOGY
2 D/34
EXISTING SPLICE BOX - PROTECT IN PLACE
T
M
K
A
B
EX
FS
IRRIGATION LEGEND
, N/35,
O/35, P/35,
Q/35, R/35
, N/35,
O/35, P/35,
Q/35, R/35
O/35
P/35, Q/35,
R/35
CREATIVE SENSOR TECHNOLOGY
EXISTING SPLICE BOX - PROTECT IN PLACE 1
PULLBOX
BROOKS PB36 PULLBOX
4 T/35
WATER METER 1-1/2"
50-150 PSI PROVIDED BY GOLDEN STATE WATER (FEB 11, 2022). 75 PSI MINIMUM REQUIRED FOR SYSTEM OPERATION.
1 POINT OF CONNECTION 1 1/2"
50-150 PSI PROVIDED BY GOLDEN STATE WATER (FEB 11, 2022). 75 PSI MINIMUM REQUIRED FOR SYSTEM OPERATION.
1 IRRIGATION LATERAL LINE: PVC SCHEDULE 40
3/4" MIN. SIZE. INSTALL PER TRENCH DETAIL.
3,759 L.F. F/34
IRRIGATION MAINLINE: EXISTING, PROTECT IN PLACE 4,937 L.F.
IRRIGATION MAINLINE: PVC SCHEDULE 40 (NEW MAINLINE)
1-1 1/2" SIZE. SIZE NOTED ON PLAN. INSTALL PER TRENCH
DETAIL.
367.0 L.F. F/34
PIPE SLEEVE: PVC SCHEDULE 40
PIPE SLEEVE LOCATION. INSTALL A MIN. 12" BEYOND EDGE OF HARDSCAPE. SEE PLAN FOR SIZES.
121.5 L.F. F/34
SB
PB
M
(EXISTING)
(NEW)
VALVE NUMBER
# # VALVE FLOW
#"
VALVE CALLOUT
VALVE SIZE
# HYDROZONE
# DECODER
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL
IRRIGATION LEGEND
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
08/09/2023
08/09/2023
36 8-1059
IRRIGATION CALCULATIONS, NOTES, AND LEGENDS
WATER EFFICIENCY STATEMENT
I AM FAMILIAR WITH THE REQUIREMENTS FOR LANDSCAPE AND
IRRIGATION PLANS CONTAINED IN THE STATE MODEL WATER
EFFICIENT LANDSCAPE ORDINANCE. I HAVE PREPARED THIS PLAN
IN COMPLIANCE WITH THOSE REGULATIONS AND CERTIFY THAT
THE PLANS IMPLEMENTS THOSE REGULATIONS TO PROVIDE
EFFICIENT USE OF WATER.
NAME
8/9/2023
DATE
CABLE NOTE: FOR COMMUNICATION BETWEEN
LOCAL DECODERS AND NEW MAIN LINE RUNS.
P-7072D PAIGE ELECTRIC COMMUNICATION
CABLE – 14 AWG/2 CONDUCTOR “MAXI” CABLE
WITH TWO TYPE UF WIRES WITH A PE OUTER
JACKET. THE COLORS OF THE OUTER JACKET
SHALL BE AS CALLED-FOR IN THE IRRIGATION
PLANS AND SPECIFICATIONS.
PAIGE PART #PRODUCT DESCRIPTION
180115 14 AWG RED JACKET
180126 14 AWG WHITE
PAIGE PART #PRODUCT DESCRIPTION
180127 14 AWG BLACK
180114 14 AWG ORANGE
180116 14 AWG BLUE
180118 14 AWG YELLOW
1801181 14 AWG PURPLE
1801182 14 AWG BROWN
1801151 14 AWG PINK
1801183 14 AWG GRAY
180117 14 AWG GREEN
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY GARDENA MARKET PLACE
ARTESIA BLVD LIMIT OF WORK
DEEP ROOT BARRIERS C-01
C-01
1 - 24" BOX STD
LAG MUL
DEEP ROOT BARRIERS
3 - 24" BOX STD
LAG MUL
14'-0" FOC
12'-0" FOC
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 123 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
CONSTRUCTION LEGEND - SHEET 37
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 2
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 4 A/46 (LIGHT LAVENDER - STANDARD)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 101 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 610 D/46 PLANT LEGEND - SHEET 37 MATCHLINE - SEE SHEET 38
N O R T H
0 40 feet
1" = 20'
20 60 80
37 N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059
PLANTING PLAN
KEYMAP
SCALE: NTS
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY MAGNOLIA WAY DENKER AVENUE
ARTESIA BLVD
AA
AA
AA
AA
AA
AA
AA AC AC
AC
AC
AA
AA
AA
AA AA
AA
AA
AA
AA
AA AA
AA AC
AC
AC
BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE
BE BE BE BE BE BE BE BE BE BE BE BE
AC AC AC AC AC AC
AC AC AC AC AC
AC AC
BE
AA
AA AC AC AC AC AC
AC AC AC AC AC
AC
AC AC AC AC
AC AC AC AC
AC AC
AA
C-01
C-01 C-01
C-01
C-02
C-02
C-02
1 - 24" BOX STD
LAG MUL
12'-0" FOC 1'-0" TYP81'-0"
12'-0" FOC43'-0" 10'-0"
45'-0" FOC10'-0" 40'-0"
101'-6" 3'-0" FOC
1'-0" TYP
C-01 1'-0" TYP
BE BE BE BE BE BE BE BE BE
BE
BE
BE BE
BE BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE BE
BE BE
BE
BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE
BE
BE
C-02
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 515 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 570 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
C-02
CONSTRUCTION LEGEND - SHEET 38
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 1
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 1 A/46 (LIGHT LAVENDER - STANDARD)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 22 B/46
ALOE CAMPERI / ALOE 5 GAL 41 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 146 B/46 ALOE VERA / MEDICINAL ALOE 5 GAL 25 B/46
ALOE X 'BLUE ELF' / BLUE ELF ALOE 1 GAL 94 B/46
LOMANDRA LONGIFOLIA `BREEZE` / DWARF MAT RUSH 5 GAL 40 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 2,123 D/46 AA
AC
BE
PLANT LEGEND - SHEET 38
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 37 MATCHLINE - SEE SHEET 39 38 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY CITY RIGHT OF WAY DALTON AVENUE
ARTESIA BLVD
T MH
G PRIVATE ALLEY
AA
AA
AA
AA
AA AA
AA
AA
AA
AA
AA
AA
AA AA
AA AA AA
AA
AA
AA
AA
AA
AA
AA
AA
AA C
R-06
C-01
C-01
C-01
C-02 R-04
C-02 R-05 1 - 24" BOX STD
LAG MUL
R-07
38'-0" FOC
65'-0" FOC155'-0" 12'-0" 1'-0" TYP
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
EXISTING GAS METER - PROTECT IN PLACE
EXISTING MANHOLE - PROTECT IN PLACE
TRAFFIC BOX - PROTECT IN PLACE
CONTROLLER ASSEMBLY - REFER TO IRRIGATION PLAN
R-04
R-05
R-06
R-07
REFERENCE LEGEND - SHEET 39
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 447 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 242 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
C-02
CONSTRUCTION LEGEND - SHEET 39
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 1
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 1 A/46 (LIGHT LAVENDER - STANDARD)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 25 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 170 B/46 ALOE VERA / MEDICINAL ALOE 5 GAL 19 B/46
LOMANDRA LONGIFOLIA `BREEZE` / DWARF MAT RUSH 5 GAL 44 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 1,490 D/46 AA
PLANT LEGEND - SHEET 39
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 38 MATCHLINE - SEE SHEET 40 39 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
ARTESIA BLVD PRIVATE DRIVEWAY
AA
AA
AA AA
AA
AA
AA
AA
AA
AA
AA
AA AA
AA AC
AC
AC
AC
AC
AC AC
AC AC
AC
AC AC AC AC AC AC AC
AC
AC AC AC
AA
AA
AA
AA
AA AC AC
AC AC AC AC AC AC AC
C-01 C-01 C-02
36" Box - 1
MEL TRE
248'-0" FOC
98'-7" FOC 1'-0" TYP
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 2,954 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 229 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
C-02
CONSTRUCTION LEGEND - SHEET 40
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 1
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
EXISTING MELALEUCA EXISTING 1
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
MELALEUCA QUINQUENERVIA / CAJEPUT TREE 36" BOX 1 A/46
(SINGLE TRUNK)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 18 B/46
ALOE CAMPERI / ALOE 5 GAL 28 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 57 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 474 D/46 AA
AC
PLANT LEGEND - SHEET 40
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 39 MATCHLINE - SEE SHEET 41 40 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY NORMANDIE AVENUE
ARTESIA BLVD
E
60'-0" UPRR
RIGHT OF WAY
DOT # 760511G
AA
AA AC AC AC AC AC AC
AC AC AC AC AC
AC AC AC
AC AC AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA A
A
A A A
A
A
A
A
AC AC AC AC AC AC AC AC AC AC AC
AC AC AC AC AC AC AC AC
AC AC A
A
A
A
AC AC AC AC AC AC
AC AC AC AC
AC AC AC
AC AC
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA AA
AA
AA AA
AA AA
AA
C-01
C-01
C-01
C-02
R-03
1 - 36" Box
MEL TRE
262'-9" FOC 1'-0" TYP FOC
R-08
R-08
R-08
R-08
C-03
4'-6" 4'-6"
C-03
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
EXISTING ELECTRICAL METER - PROTECT IN PLACE
EXISTING CROSSING WARNING DEVICE AND FLASHERS - PROTECT IN PLACE
R-03
R-08
REFERENCE LEGEND - SHEET 41
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 2,603 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 320 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
STABILIZED DECOMPOSED GRANITE 65 SF
COLOR: GOLD
NOTE: INSTALL AND COMPACTED ON NATIVE, 4 INCH THICK
C-01
C-02
C-03
CONSTRUCTION LEGEND - SHEET 41
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 2
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
EXISTING MELALEUCA EXISTING 1
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
MELALEUCA QUINQUENERVIA / CAJEPUT TREE 36" BOX 1 A/46
(SINGLE TRUNK)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 29 B/46
ALOE ARBORESCENS / TREE ALOE 15 GAL 13 B/46
ALOE CAMPERI / ALOE 5 GAL 50 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 95 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 779 D/46 AA
A
AC
PLANT LEGEND - SHEET 41
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 40 MATCHLINE - SEE SHEET 42 41 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY
ARTESIA BLVD
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AC
AC AC
AC
AC
AC
AC
AC
AC AC
AC AA AC
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA AA
AA
BE
AC
AC
AC
AC
AC
AC AC AC
AC AC
AC
AC
AC
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE
BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE
BE BE BE
BE C-01
C-01
C-02
227'-6" 1'-0" TYP
24" BOX STD - 3
LAG MUL
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 2,491 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 571 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
C-02
CONSTRUCTION LEGEND - SHEET 42
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING MELALEUCA EXISTING 3
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 3 A/46 (LIGHT LAVENDER - STANDARD)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 54 B/46
ALOE CAMPERI / ALOE 5 GAL 25 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 227 B/46 ALOE VERA / MEDICINAL ALOE 5 GAL 90 B/46
ALOE X 'BLUE ELF' / BLUE ELF ALOE 1 GAL 72 B/46
LOMANDRA LONGIFOLIA `BREEZE` / DWARF MAT RUSH 5 GAL 163 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 1,595 D/46 AA
AC
BE
PLANT LEGEND - SHEET 42
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 41 MATCHLINE - SEE SHEET 43 42 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY GATEWAY
CITY RIGHT OF WAY
ARTESIA BLVD GATEWAY
C-01
C-01
201'-0" FOC
301'-0"
C-01 FOC
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 4,340 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
CONSTRUCTION LEGEND - SHEET 43
ABBREVIATIONS:
FOC FACE OF CURB
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 42 MATCHLINE - SEE SHEET 44 43 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
CITY RIGHT OF WAY
ARTESIA BLVD SHOPPING PRIVATE CENTER DRIVEWAY
E
AA
AA
AA AA
AA
AA
AA
AA
AA
AA
AA AA
AA AA
AA
AA AA
AA
AA
AC
AC
AC
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA AA AC
AC
AA AA
AA
AA AA
AA
AA
AA AA
AA AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE
BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE
BE BE
BE BE BE BE
BE BE BE
BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
AC AC AC AC AC AC AC
AC
AC AC AC AC AC
AC AC AC
AC AC AC AC AC
AC AC AC AC
AC AC AC
AC AC AC
BE BE BE BE
BE BE BE BE BE
BE BE BE BE BE BE BE
BE BE BE AC AC AC AC
AC AC AC AC
AC AC AC AC AC AC AC
AC AC AC AC AC AC AC
R-03
C-01
3 - 24" BOX STD
LAG MUL
C-02
3 - 24" BOX STD
LAG MUL
14'-10" FOC 1'-0" TYP
BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE
BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
BE BE
BE BE
BE BE BE BE BE
BE BE
BE C-02
24" BOX STD - 3
LAG MUL
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
R-03 EXISTING ELECTRICAL METER - PROTECT IN PLACE
REFERENCE LEGEND - SHEET 44
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 333 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 946 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
C-02
CONSTRUCTION LEGEND - SHEET 44
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 2
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
EXISTING MELALEUCA EXISTING 5
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 9 A/46 (LIGHT LAVENDER - STANDARD)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 55 B/46
ALOE CAMPERI / ALOE 5 GAL 58 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 251 B/46 ALOE VERA / MEDICINAL ALOE 5 GAL 52 B/46
ALOE X 'BLUE ELF' / BLUE ELF ALOE 1 GAL 259 B/46
LOMANDRA LONGIFOLIA `BREEZE` / DWARF MAT RUSH 5 GAL 299 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 2,081 D/46 AA
AC
BE
PLANT LEGEND - SHEET 44
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 43 MATCHLINE - SEE SHEET 45 44 N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
PLANTING PLAN
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY RIGHT OF WAY
ARTESIA BLVD SHOPPING CENTER CENTER VERMONT AVENUE PRIVATE DRIVEWAY PRIVATE DRIVEWAY E
E LIMIT OF WORK
AA AA AA AA AA
AA AA AA AA AA AA
AA AA AA AA
AA AA
AA
AA AA
AA AA
AA
AA AA AA
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE
BE AA AA
AA AA
BE BE BE BE BE BE BE
BE BE BE BE AA AA AA AA AA AA AA AA
AA AA AA AA AA AA AA
AA AA AA AA AA AA AA AA
AA
BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE
BE BE
BE BE
BE BE
BE BE
BE
BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE
BE BE BE BE BE AA
AA
AA
AA
AA
AA AA
AA AA
AA
AA
AA
AA
AA
AA
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AA
AA
AA
AA
AA
AA
AA
AA
AA AA AA
AA AA
AA
AA
AA
AA AA
AA
AA A
A
A
A
A
A A
A
A
A
A
A
A
A
A
A
AA AA
AA AA
AA
AA AA AA
AA AA AA AA AA AA
AA AA AA
AA AA
AA AA
AA
AA
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A A
A A A
A
A
A
A
A
A A
A
A
A A
A
A
A A
AC
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE AC AC AC AC
AC AC AC AC AC AC
AC AC AC AC AC AC
AC AC AC AC AC
AC AC AC AC
AC AC AC AC
AC AC
BE BE
BE BE
BE BE BE BE BE
BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE
BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BEBE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE
BE BE BE
BE
BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE
BE BE
BE BE BE BE BE BE BE BE BE BE BE BE
BE BE BE BE BE BE BE BE BE
BE BE BE BE BE
BE BE BE
BE AA
R-02
R-03 R-01
C-01 R-03
C-01 C-02
C-02
C-02
C-02
24" BOX STD - 3
LAG MUL
2 - 36" Box
MEL TRE
26'-4" FOC 1'-0" TYP
46'-2" FOC 1'-0" TYP
SD W WESTERN AVE NORMANDIE AVE VERMONT AVE
SYMBOL DESCRIPTION
EXISTING STAMPED PAVING - PROTECT IN PLACE
EXISTING SIGNAGE AND (6) LIGHT FIXTURES - PROTECT IN PLACE
EXISTING ELECTRICAL METER - PROTECT IN PLACE
R-01
R-02
R-03
REFERENCE LEGEND - SHEET 45
SYMBOL DESCRIPTION QTY DETAIL
NEW HARDSCAPE - COBBLE FIELD 745 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
NEW HARDSCAPE - COBBLE MAINTENANCE STRIPS 972 SF E/46
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
C-01
C-02
CONSTRUCTION LEGEND - SHEET 45
ABBREVIATIONS:
FOC FACE OF CURB
CITY STD DETAIL: ST-11/46
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING MELALEUCA EXISTING 3
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 3 A/46 (LIGHT LAVENDER - STANDARD)
MELALEUCA QUINQUENERVIA / CAJEPUT TREE 36" BOX 2 A/46
(SINGLE TRUNK)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 114 B/46
ALOE ARBORESCENS / TREE ALOE 15 GAL 67 B/46
ALOE CAMPERI / ALOE 5 GAL 32 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 244 B/46 ALOE X 'BLUE ELF' / BLUE ELF ALOE 1 GAL 645 B/46
LOMANDRA LONGIFOLIA `BREEZE` / DWARF MAT RUSH 5 GAL 198 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 3,492 D/46 AA
A
AC
BE
PLANT LEGEND - SHEET 45
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
02/29/2024
02/29/2024
8-1059 MATCHLINE - SEE SHEET 44
45 PLANTING PLAN
N O R T H
0 40 feet
1" = 20'
20 60 80
KEYMAP
SCALE: NTS
NOTE:
FOR PLANTING LEGEND, NOTES AND DETAILS, SEE
SHEETS 46 & 47.
NOTE:
MAINTAIN AND PROTECT IN PLACE ALL EXISTING TREES.
GRUB AND CLEAR SHRUBS & GROUNDCOVER PER
DEMOLITION PLANS.
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
GROUNDCOVER PLANTING
SCALE: NTS PLAN VIEW / SECTION 1/2 THE DISTANCE OF O.C. SPACING EQUAL
EQUAL
EQUAL
EDGE OF HARDSCAPE 12" MN.
1 2
3 4
MULCH IN PLANTING AREA
(SEE PLANTING NOTES,
THIS SHEET) (SEE SPECS -
PROVIDE 3" IN ALL OTHER
AREAS BEYOND FLATS AND
CUTTINGS)
1 2 FINISH GRADE
3 PLANTING HOLE
PLANTING BACKFILL
(SEE SPECS)
4 D
COBBLESTONE INSTALLATION
SCALE: NTS SECTION / PLAN
SEE PLANS FOR MEDIAN WIDTH
C 2% L
NOTE:
WHERE CURB
ELEVATIONS VARY
INSTALL TO DRAIN
TO LOW CURB. 2%
SEE DETAIL A
TC TC
DETAIL A
NOTE: · DETAIL NOT TO SCALE. · FOR ILLUSTRATIVE PURPOSES ONLY. · USE PHOTO EXAMPLE OF COBBLESTONE FOR SIMILAR PATTERN TO BE USED. *
* ROCK HEIGHT
1" TO 1.5" ABOVE TC **
1" CONCRETE GAP BETWEEN
ROCKS AND BACK OF CURB
** 4" MIN. PEA GRAVEL
CONCRETE BED
SET COBBLE TO FULL DEPTH IN CONCRETE BED
WITH REQUIRED 1" TO 1.5" EXPOSURE ABOVE TC.
WIRE BRUSH FINISH JOINTS BETWEEN ROCKS.
90% MIN. COMPACTED SUBGRADE OR BASE
MATERIAL PER PLANS AND SPECS.
1" CONCRETE GAP BETWEEN
ROCKS AND BACK OF CURB
1. ROCK SIZES UNLESS OTHERWISE SPECIFIED SHALL BE: COBBLESTONE MAX. 8" TO MIN. 4", NO MORE THAN 50% OF ANY ONE SIZE.
2. A SAMPLE AREA, MIN. 10 SQ. FT. SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO PROCEEDING WITH THE REMAINING ROCK WORK.
3. FINAL RESTING POSITION OF ALL ROCKS SHALL BE APPROVED BY THE CITY INSPECTOR.
4. ROCKS SHALL BE SMOOTH, ROUNDED, FREE OF OBJECTIONABLE
DISFIGURATIONS AND IRON CONTENT AS APPROVED BY THE CITY INSPECTOR.
5. CONCRETE SHALL BE 2500 PSI PEA GRAVEL PUMP MIX CONCRETE.
6. WIRE BRUSH ALL JOINTS AFTER THE INSTALLATION OF THE COBBLES.
AFTER CONCRETE HAS SET, CLEAN THE RESIDUE FROM SURFACES OF COBBLES.
7. NO JOINTS GREATER THAN 1" BETWEEN ROCKS WILL BE ACCEPTABLE. 4" FILLER ROCKS WILL BE ACCEPTED TO MAINTAIN THE 1" JOINT.
8. WHERE ROCK BORDERS PLANTER AREA, PLACE 1" CONCRETE EDGE BETWEEN BACK OF ROCK AND PLANTER. STREET PLANTER AREA PER PLAN E
ROOT BARRIER
SCALE: NTS PLAN VIEW / SECTION
CL SEE NOTE
5'-0" 5'-0" 1" 24"NOTE:
ROOT BARRIER IS REQUIRED
WHERE TREE IS 5'-0" OR LESS
FROM EDGE OF HARDSCAPE.
SECTION
PLAN
1 2
1 2
3 4
5 1 HARDSCAPE
ROOT BARRIER
(SEE PLANTING NOTES)
2 TRENCH FOR ROOT
BARRIER ALONG EDGE OF
HARDSCAPE MAY BE SAME
AS IRRIGATION TRENCH
WHERE APPLICABLE
(BACKFILL SAME AS
ADJACENT MATERIAL)
3 SET TOP OF ROOT BARRIER
1" BELOW FINISH GRADE
4 TREE PLANTING PER PLANS
AND DETAILS
5 A
SHRUB ON LEVEL GRADE
SCALE: NTS SECTION
2X ROOTBALL
DIAMETER ROOTBALL DEPTH
1 2
3 6
5 4
SET TOP OF ROOTBALL
1" ABOVE FINISH GRADE
1 MULCH IN PLANTING AREA (SEE
PLANTING NOTES, THIS SHEET)
2 3 3" HIGH WATERING BERM
4 FINISH GRADE
PLANTING BACKFILL
(SEE SPECS)
5 SLOPE PLANTING HOLE TO
CORNERS
6 B
SHRUB SPACING
SCALE: NTS PLAN VIEW
NOTE:
LOCATE PLANTS EQUALLY PER
TRIANGULAR SPACING UNLESS
SHOWN OTHERWISE ON PLANS 1/2 THE DISTANCE OF O.C. SPACING EQUAL
EQUAL
EQUAL
EDGE OF HARDSCAPE
C
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
08/10/2023
08/10/2023
46 8-1059
PLANTING DETAILS
COBBLESTONE SPECIFICATIONS
TYPE: ARIZONA COBBLE
SIZE: 4" TO 8"
SUPPLIER: SOUTHWEST BOULDER & STONE (OR EQUAL)
PHONE: 760 - 451 - 3333
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
CITY STD DETAIL: ST-11/46
CITY STD DETAIL: ST-11/46
C/46
C/46
C/46
C/46
C/46
C/46
C/46
TREES BOTANICAL / COMMON NAME SIZE QTY DETAIL
EXISTING LAGERSTROEMIA EXISTING 9
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
EXISTING MELALEUCA EXISTING 13
PROTECT IN PLACE
UNLESS OTHERWISE NOTED ON PLAN
LAGERSTROEMIA X `MUSKOGEE` / TO MATCH EXISTING 24" BOX STD 21 A/46 (LIGHT LAVENDER - STANDARD)
MELALEUCA QUINQUENERVIA / CAJEPUT TREE 36" BOX 4 A/46
(SINGLE TRUNK)
SHRUBS BOTANICAL / COMMON NAME SIZE QTY DETAIL
AGAVE ATTENUATA / AGAVE 5 GAL 317 B/46
ALOE ARBORESCENS / TREE ALOE 15 GAL 80 B/46
ALOE CAMPERI / ALOE 5 GAL 234 B/46
ALOE RUDIKOPPE / LITTLE RED RIDING HOOD ALOE 1 GAL 1,291 B/46 ALOE VERA / MEDICINAL ALOE 5 GAL 186 B/46
ALOE X 'BLUE ELF' / BLUE ELF ALOE 1 GAL 1,070 B/46
LOMANDRA LONGIFOLIA `BREEZE` / DWARF MAT RUSH 5 GAL 744 B/46
GROUND COVERS BOTANICAL / COMMON NAME SIZE SPACING QTY DETAIL SENECIO SERPENS / BLUE CHALKSTICKS 4" POT 12" o.c. 12,644 D/46 AA
A
AC
BE
PLANT LEGEND
N0. REVISIONS DATE BY APP. ENGINEERING DIVISION
APPROVED BY :
CITY OF GARDENA
SHT. OF
PUBLIC WORKS ENGINEERING DIVISION
DRAWN BY
BGB
CHECKED BY
DEPARTMENT OF PUBLIC WORKS
DESIGNED BY
F. B. REF.
LIMITS:
PROJECT :
NO.
DWG.
DATE:
DATE
UNDER THE SUPERVISION OF:
ARTHUR D. GUY CLA 2214
PLANS PREPARED BY:
AG
NN
ARTESIA BLVD. ARTERIAL IMPROVEMENT PROJECT
WESTERN AVE. TO VERMONT AVE. JN 935 PHASE 2
-
-
- 47
3185 C1 Airway Avenue Costa Mesa, CA 92626
P: 714-545-2898 F: 714-545-2878 bgb-inc.com
2214
Signature
Date
ARTHUR D GUY I I
R
EG I STERED LANDSCAPE ARCH I TECT
S T A T E O F CA L I F OR N I A
EXP . 5 / 3 1/ 2024
08/10/2023
08/10/2023
47 8-1059
PLANTING LEGEND AND NOTES
PLANTING NOTES:
GENERAL NOTES:
1. TREE SYMBOLS SHOWN ON PLAN SHALL BE CONSIDERED DIAGRAMMATIC. ALL
APPLICABLE CITY SPECIFICATIONS AND STANDARDS SHALL BE ADHERED TO AND REVIEWED PRIOR TO PLANTING.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTINUOUS PROTECTION OF ALL PLANT MATERIALS ON-SITE UNTIL TURNOVER.
3. THE PLACEMENT OF ALL TREES, SHRUBS, GROUNDCOVERS AND VINES SHALL BE REVIEWED BY THE ENGINEER PRIOR TO PLANTING. ANY TREE OR SHRUB THAT IS
PLANTED WITHOUT PRIOR REVIEW IS SUBJECT TO REMOVAL AND RELOCATION IF DEEMED NECESSARY. ALL PLANT MATERIAL SHALL BE SUBJECT TO INSPECTION AND APPROVAL BY ENGINEER / CITY REPRESENTATIVE.
4. ALL WORK SHALL CONFORM TO APPLICABLE LOCAL CODES.
5. ALL PLANT MATERIAL WITHIN A SPECIES SHALL HAVE SIMILAR SIZE, AND SHALL BE OF A FORM TYPICAL OF THE SPECIES. ANY PLANT DEEMED UNACCEPTABLE BY THE ENGINEER
SHALL BE IMMEDIATELY REMOVED FROM THE SITE AND SHALL BE REPLACED WITH AN ACCEPTABLE PLANT OF LIKE TYPE AND SIZE AT THE CONTRACTOR'S EXPENSE. ANY
MATERIAL APPEARING TO BE UNHEALTHY, EVEN IF DETERMINED TO STILL BE ALIVE, SHALL NOT BE ACCEPTED. THE ENGINEER SHALL BE SOLE JUDGE AS THE ACCEPTABILITY OF PLANT MATERIAL.
6. FINISH GRADES SHALL BE INSTALLED 3" BELOW HARDSCAPE, CURBS AND UTILITY BOXES.
7. PLANT QUANTITIES SHOWN ON LEGENDS ARE FOR GENERAL INFORMATION. SHOULD
ANY DISCREPANCIES BETWEEN THE LEGEND AND SHEET QUANTITIES OCCUR, THE HIGHER NUMBER SHALL SUPERSEDE.
8. CONTRACTOR SHALL LAYOUT ALL PLANTS IN THEIR ORIGINAL CONTAINERS ON SITE FOR APPROVAL OF THE ENGINEER. PLANT PITS MAY ONLY BE DUG AFTER APPROVAL OF PLANT LOCATIONS BY THE ENGINEER. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
9. ALL SHRUBS OF ANY SPECIES SHALL ALL BE PURCHASED FROM ONE NURSERY TO AVOID DIFFERING VARIETY MIXES.
10. ALL SHRUBS AND/OR SUCCULENT PLANTS SHALL BE PLANTED NO CLOSER THAN 24" TO THE BACK OF CURBS.
11. THE ROTOTILLING AND SOIL PREPARATION SHALL NOT BE PERFORMED WITHIN 5 FEET OF TRUNKS ON ARTESIA. AREAS TO BE PROTECTED SHALL BE CLEARLY MARKED IN GYPSUM FOR THE APPROVAL OF THE ENGINEER PRIOR TO ROTOTILLING OPERATIONS.
ALL ROOTS ONE INCH IN DIAMETER AND LARGER SHALL BE CLEANLY CUT.
12. ALL PLANT PITS SHALL BE HAND-DUG WITHIN ROOT ZONES SPECIFIED ABOVE, AND IN ALL AREAS WHERE ROOT GROWTH IS PREVALENT PER THE ENGINEER. REFER TO SPECIFICATIONS FOR OPERATIONS NEAR EXISTING TREE ROOT ZONES.
13. ALL EXISTING TREES SHALL BE PROTECTED IN PLACE UNLESS MARKED FOR REMOVAL ON PLAN. ANY DAMAGE TO EXISTING TREES MAY REQUIRE REPLACEMENT IN SIMILAR SIZE AND TYPE AS DETERMINED BY THE ENGINEER.
14. ALL UTILITIES SHOWN ARE SCHEMATIC. CONTRACTOR SHALL CONTACT UNDERGROUND ALERT TO LOCATE ALL EXISTING UTILITY LINES.
MULCH NOTE:
1. INSTALL AGUINAGA GREEN 'FOREST FLOOR' 0-2" OR APPROVED EQUAL IN ALL LANDSCAPE AREAS. INSTALL TO A 3" THICKNESS. CONTINUOUSLY MAINTAIN AND REPLACE AS NECESSARY UNTIL ACCEPTANCE. PH: 1 (877) OC - MULCH ROOT BARRIER NOTE:
1. ALL TREES PLANTED WITHIN 5'-0" OF HARDSCAPE AREAS (I.E., WALLS, SIDEWALKS, BUILDINGS, STRUCTURES, ETC.) SHALL BE PLANTED WITH ROOT BARRIERS. BARRIER SHALL EXTEND A MINIMUM OF 5'-0" ON EACH SIDE OF TRUNK. PROVIDE 18" DEEP ROOT BARRIER ADJACENT TO PAVING. PROVIDE 24" DEEP ROOT BARRIER ADJACENT TO CURB.
SEE PLANTING DETAIL SHEET FOR ROOT BARRIER DETAIL.
PLANT INSTALLATION
1. ALL PLANTS SHALL BE VERIFIED BY LANDSCAPE ARCHITECT BY ON-SITE INSPECTION OR THROUGH PHOTOGRAPHS FROM NURSERY PRIOR TO PLANTING. PLANTS MAY BE SUBJECT TO REPLACEMENT BY THE DISCRETION OF THE LANDSCAPE ARCHITECT.
2. PRIOR TO PLANTING, PLANTS SHALL BE LOCATED ABOVE GRADE ON SITE IN THEIR CONTAINERS IN THE LOCATION OF FINAL PLANTING PER THE APPROVED PLANTING PLAN.
3. THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED WITHIN 48 HOURS TO INSPECT THE FINAL LOCATIONS FOR ALL PLANT MATERIAL .
5-2612
PUBLIC WORKS DIRECTOR / CITY ENGINEER
SEE SHEET 1 FOR SIGNATURE
SEE SHEET 1
FOR DATE
NOTICE OF EXEMPTION
TO: Office of Planning & Research County Clerk / Registrar Recorder 1400 Tenth Street ATTN: Environmental Filings Clerk
Sacramento, CA 95814 12400 East Imperial Highway, Room 1101 Norwalk, CA 90650
Project Title: Artesia Arterial Improvement Project JN 935 Phase 2 Project Location (Specific): Western Avenue to Vermont Ave.
Project Location (City): Gardena Location (County): Los Angeles County Description of nature, purpose and beneficiaries of project: This project will upgrade the traffic signal system, resurface asphalt pavement, adjust medians, augment irrigation / landscaping and replace broken concrete sidewalk and ADA ramps within project limits.
Name of public agency approving project: City of Gardena Name of person or agency carrying out project: City of Gardena Exempt Status: (Check One)
Ministerial: (P.R.C. Sec. 21080[b][1]; Guidelines Sec. 15268) Declared Emergency: (P.R.C. Sec. 21080[b][3]; Guidelines Sec. 15269[a]) Emergency Project (P.R.C. Sec. 21080[b][4]; Guidelines Sec. 15269[b][c]) X Categorical Exemption: Section 15301 Class 1, Existing Facilities Other: Guidelines Sec. 15061):
_______________________________________________________________________ Reason why project is exempt: This project consists of minor alteration of existing public facilities and involves negligible or no expansion of use beyond that previously existing.
Contact person: William Mendoza Telephone: 310-217-9608 If filed by applicant:
1. Attach certified document of exempting finding.
2. Has a notice of exemption been filed by the public agency approving the project? Yes No Date received for filing:
Clint Osorio Date
Environmental Quality Officer
NOTE: Exempt from Dept. of Fish & Game Wildlife Fee in accordance with de minimis impact finding (735.5[c])
City of Gardena
Gardena City Council Meeting
AGENDA REPORT SUMMARY
Agenda Item No. 16.B
Section: DEPARTMENTAL
ITEMS - PUBLIC WORKS
Meeting Date: September 10,
2024
TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE: Award Construction Contract for the Pedestrian Safety Improvement FY 2023-2024 Project (Phase 2), JN 527, to Kalban, Inc., in the amount of $199,679, Declare California Environmental Quality Act (CEQA) Exemption under Section 15301, Approve the Project Specifications and Budget Contingency
COUNCIL ACTION REQUIRED:
Staff Recommendation:
Award Construction Contract
Declare CEQA Exemption Under Section 15301
Approve the Project Specifications
Approve Expenditures of Remaining Budget as Contingency RECOMMENDATION AND STAFF SUMMARY:
The Pedestrian Safety Improvement FY 2023-2024 Project, Phase 2, will upgrade and/or replace damaged curb and gutter, sidewalks, driveways, and trees within the City's Maintenance District, Zone 2. The first phase was the sidewalk trip hazard survey and repair of uplifted sidewalks under two (2) inches in Zone 2, which was completed in July of 2024 by Southern California Precision Concrete, Inc.
The concrete replacement locations for the second phase of the project will follow the inspected Maintenance District, Zone 2, during the first phase, where the uplifted sidewalks are greater than 2 inches and the residential request list. These locations have been identified as deficient and will improve accessibility, safety, and aesthetics. An environmental assessment has been prepared in accordance with the CEQA guidelines. It has been determined that the project is categorically exempt.
The following four (4) bids were received on August 8, 2024:
1. Kalban, Inc., Santa Clarita $199,679.00
2. Rojas Construction, San Pedro $210,798.00
3. Aguilar & Calderon, Whittier $273,150.00
4. We R Builders, Inc., Glendale $280,880.00
Kalban, Inc. was the lowest responsive bidder. They are a state licensed contractor with verified successful construction experience in the field with other nearby municipalities and will be required to meet all bonding and financial standards. The Tentative construction start date is November 2024 with an anticipated project completion in December 2024.
Staff respectfully recommends the City Council award the construction contract for Pedestrian Safety Improvement FY 2023-2024 Project (Phase 2), JN 527, to Kalban, Inc. in the amount of $199,679.00, and additionally:
a. Declare this project to be categorically exempt under the CEQA, Class 1, Section 15301 (d), as rehabilitation of existing facilities.
b. Approve the project specifications.
c. Approve expenditures of remaining budget, $67,249.00 (34%), as a contingency.
FINANCIAL IMPACT/COST:
Source of Funds:
FY 2024-2025 Budget
(Measure M)
$266,928.00
Estimated Expenditures:
Construction Contract Award $199,679.00
34% Construction Management & Inspection and Construction Contingency
$67,249.00
Total $266,928.00
ATTACHMENTS:
JN 527 Specs_Signed.pdf
JN 527_CEQA_NOE.pdf
JN 527_District 2 Map.pdf
APPROVED:
___________________________________
Clint Osorio, City Manager
CITY OF GARDENA
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
JN 527
JULY 2024
CITY OF GARDENA
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
JN 527
Plans & Specifications prepared by:
Memoranda:
Plans and specifications are available at Planwell Administrator, 562.436.9761 or https://www.e-arc.com/location/costa-mesa/ (Go to Planrooms/Order From Planwell/Public Planroom and select City of Gardena under pulldown menu) Bid Results: https://www.cityofgardena.org/public-contracts/ City of Gardena Public Works Engineering Division: 310.217.9568
CITY OF GARDENA
NOTICE INVITING BIDS
for
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024 VARIOUS LOCATIONS PROJECT NO. JN 527
Plans and Specifications are available through ARC Document Solutions. Please be advised that there is an additional charge for delivery. Upon payment of the purchase price, they become the property of the purchaser and may not be returned for refund.
You may access the plans through the following website under Public Planroom:
https://www.e-arc.com/location/costa-mesa/
(Scroll down to “Planrooms”/”Order From PlanWell”/”Public Planroom” and select City of Gardena under the “in all company” pulldown menu)
or
https://customer.e-arc.com/arcEOC/Secures/PWELL_PrivateList.aspx?PrjType=pub For help accessing and ordering, please contact a Planwell Administrator at 562.436.9761.
Notice is hereby given that the City of Gardena will receive sealed bids at the office of the City Clerk, City Hall, 1700 W. 162nd Street, Gardena, California, until 2:00 PM on August 8th, 2024, and shortly thereafter on this same day, they will be publicly opened and read in the City Clerk’s Office in-person and via ZOOM.
The information to join the bid opening via ZOOM is the following:
Topic: Bid Opening
Time: 2:00 PM on August 8, 2024 (Shortly thereafter the deadline) Join ZOOM Meeting
https://us02web.zoom.us/j/88066880607
Meeting ID: 880 6688 0607
Dial by phone: +1 669 444 9171 US
Should you have any questions or concern in delivering a bid or joining the ZOOM Meeting, please contact City Clerk’s office at (310) 217-9565 or via email at [email protected].
All bids must be in writing, must be sealed, and must be plainly marked on the outside: "BID ON PROJECT NO. JN 527. Any bid received after the hour stated above for any reason whatsoever, will not be considered for any purpose but will be returned unopened to the bidder.
Bids are required for the entire work as described below:
Removal and replacement of curbs, gutters, sidewalks, trees, driveways, PCC pavement, etc.
ENGINEER’S ESTIMATE: $221,000.00
The time of completion of contract shall be 30 working days as defined in the latest Standard Specifications for Public Works (“Greenbook”). Liquidated Damages, as defined in Section 6-9, shall be $500.00 per each consecutive calendar day.
Each bidder must submit a proposal to the City, c/o City Clerk in accordance with the Plans and Specifications. Said proposal is to be accompanied by a cash deposit, a certified or cashier's check, or a bidder's bond, made payable to the City of Gardena, in an amount not less than 10 percent of the total bid submitted.
The envelope enclosing the proposal shall be sealed and addressed to the City of Gardena c/o City Clerk, and delivered or mailed to the City at 1700 W. 162nd Street, Gardena, California 90247-3778. The envelope shall be plainly marked in the upper left-hand corner as follows:
ATTENTION: CITY, c/o CITY CLERK
(Bidder's Name and Address)
(Number and title of this project) ________________________ The successful bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the contract price, and a payment bond in the amount of 100 percent of the contract price, both in a form satisfactory to the City Attorney.
The contractor shall have an active Class “A” or “C-8” license from the Contractor’s State License Board at the time of submitting bid.
Pursuant to Public Contract Code Section 22300, the Contractor may, at Contractor's sole cost and expense, substitute securities equivalent to any monies withheld by the City to insured performance under the contract unless applicable federal regulations or policies do not allow such substitution. Such security shall be deposited with the City, or a state or federally chartered bank as escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the Contract. The Contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any accrued interest thereon. Securities eligible for investment shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. No such substitution shall be accepted until the escrow agreement, letter of credit, form of security and any other document related to said substitution is reviewed and found acceptable by the City Attorney.
The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsive responsible bidder.
Bidders are advised that this Project is a public work for purposes of the California Labor Code, which requires payment of prevailing wages. Accordingly, the bidder awarded the Contract and all subcontractors shall be required to pay not less than the prevailing rate of per diem wages, as determined by the Director of the California Department of Industrial Relations, and otherwise comply with the provisions of Section 1770 et seq. of the California Labor Code, California Code of Regulations, Title 8, Section 16000 et seq., and any other applicable laws, rules and regulations adopted with respect thereto (“California Prevailing Wage Laws”).
Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by Contractor or any Subcontractor under it.
Contractor and any Subcontractor under if shall comply with the requirements of said sections in the employment of apprentices.
The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) in a format prescribed by the Labor Commissioner no less than monthly.
As of January 1, 2016, the requirement to furnish electronic certified payroll records to the Labor Commissioner will apply to all public works projects, whether new or ongoing. City may require a copy of the electronic certified payroll records submitted to the DIR at anytime.
Exceptions: The Labor Commissioner may (but is not required to) excuse contractors and subcontractors from furnishing electronic certified payroll records to the Labor Commissioner on a project that is under the jurisdiction of one of the four legacy DIR-approved labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District, and County of Sacramento) or that is covered by a qualifying project labor agreement.
These requirements will apply to all public works projects that are subject to the prevailing wage requirements of the Labor Code without regard to funding source.
The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/index.htm).
Skilled and Trained Workforce: This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.
Award of Contract: The following are conditions to the award of the contract:
I. Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business & Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5 provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract was awarded):
and
II. No contractor or subcontractor may be awarded this contract unless the contractor and each subcontractor listed on the bid is registered with the Department of Industrial Relations pursuant to Section 17265.5.
Any questions regarding this bid package may be referred to Matthew Au, Public Works Engineering Division at 310.217.9529.
T A B L E O F C O N T E N T S
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
DESCRIPTION PAGE DESCRIPTION PAGE
i
Title Page ....................................................................
Notice Inviting Bids ......................................................
Location Map ...............................................................
Table of Contents ........................................................ i Instructions to Bidders ................................................. ii-iv BID PROPOSAL (To Be Submitted with Proposal)
Bid Schedule ............................................................... BP-2 Acknowledgement of Addenda Received ..................... BP-4 Bidder’s Declaration..................................................... BP-5 Non-collision Affidavit .................................................. BP-7 Declaration of Eligibility to Contract.............................. BP-8 Bid Bond ...................................................................... BP-9 Designation of Subcontractors ..................................... BP-10 Construction Project Reference ................................... BP-11 Certificate of Non-Discrimination by Contractors .......... BP-12 Certification Regarding Debarment, Suspension,
Ineligibility and Voluntary Exclusion –
Primary Covered Transition .................................... BP-13 CONTRACT DOCUMENTS (To Be Submitted after Award)
Agreement ................................................................... CD-2 Faithful Performance Bond .......................................... CD-4 Payment Bond ............................................................. CD-6 Workers’ Compensation Insurance Certificate ............. CD-8 Indemnification and Hold Harmless Agreement
Of Subrogation and Contribution .............................. CD-9 Insurance..................................................................... CD-10
GENERAL PROVISIONS
PART 1 – GENERAL PROVISIONS ............................ GP-1 Section 1 – General ................................................ GP-1 Section 2 – Scope of the Work ................................ GP-4 Section 3 – Control of the Work .............................. GP-7 Section 4 – Control of Material ................................ GP-9 Section 5 – Legal Relations and Responsibilities .... GP-10 Section 6 – Prosecution and Progress of the Work . GP-11 Section 7 – Measurement and Payment ................. GP-13 Section 8 – Facilities for Agency Personnel ............ GP-14
TECHNICAL PROVISIONS
PART 2 – CONSTRUCTION MATERIALS ................... TP-1 Section 200 – Rock Materials .................................. TP-1 Section 201 – Concrete, Mortar, and Related
Materials ........................................... TP-1 Section 203 – Bituminous Materials ......................... TP-1 PART 3 – CONSTRUCTION METHODS ..................... TP-2 Section 300 – Earthwork ......................................... TP-2 Section 302 – Roadway Surfacing ........................... TP-4 Section 314 – Traffic Striping, Curb and Pavement
Markings, and Pavement Markers ..... TP-4
PART 4 – EXISTING IMPROVEMENTS ...................... TP-5 Section 400 – Protection and Restoration................ TP-5 Section 401 – Removal ........................................... TP-5 Section 402 – Utilities .............................................. TP-7 Section 403 – Manhole Adjustment and
Reconstruction .................................. TP-7
Section 404 – Cold Milling ....................................... TP-7 PART 5 – PIPELINE SYSTEM REHABILITATION ....... TP-8
Section ### – XXXXXXXXXX .................................. TP-8 PART 6 – TEMPORARY TRAFFIC CONTROL ............ TP-8
Section 600 – Access .............................................. TP-8 Section 601 – Temporary Traffic Control for
Construction and Maintenance
Work Zones ...................................... TP-9
PART 7 – STREET LIGHTING AND TRAFFIC
SIGNAL SYSTEMS ..................................... TP-10 Section 700 – Materials ........................................... TP-10 Section 701 – Construction ..................................... TP-11 PART 8 – LANDSCAPE AND IRRIGATION ................. TP-11 Section 801 – Installation ........................................ TP-11
APPENDIX
APPENDIX A: CITY STANDARDS
APPENDIX B: CALTRANS STANDARDS
ii
INSTRUCTIONS TO BIDDERS
FORM OF PROPOSAL
The Proposal shall be fully executed and submitted on the forms in the project specifications and shall be enclosed in a sealed envelope marked and addressed as directed in the Notice Inviting Bids.
PRPOSAL / BID DOCUMENTS
All Proposals shall include the following executed documents to be submitted with each bid:
Bidding Schedule
Acknowledgement of Addenda Received
Bidder's Declaration
Non-Collusion Affidavit
Declaration of Eligibility of Contract
Bid Bond
Designation of Subcontractors
Construction Project Reference
Certificate of Non-Discrimination by Contractors
Certification of Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Primary Covered Transitions
DELIVERY OF PROPOSAL
The Proposal shall be delivered by the time and to the place stipulated in the Notice Inviting Bids. It is the bidder's sole responsibility to see that its Proposal is received as stipulated. Any Proposal received after the scheduled closing time for receipt of proposals will be returned to the bidder unopened.
WITHDRAWAL OF PROPOSAL
The Proposal may be withdrawn by the bidder by means of a written request, signed by the bidder or its properly authorized representative. Such written request must be delivered to the place stipulated in the Notice Inviting Bids for receipt of proposals prior to the scheduled closing iii
time for receipt of proposals. No Proposal may be withdrawn after the hour fixed for opening bids.
MODIFICATIONS AND ALTERNATIVE PROPOSALS
Unauthorized conditions, limitations, or provisions attached to the Proposal will render it informal and may be grounds for its rejection as non-responsive. The completed Proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. Oral, telegraphic, or telephonic proposals or modifications will not be considered.
DISCREPANCIES IN PROPOSALS
In the event there is more than one bid item in a Bidding Schedule, the bidder shall furnish a price for all bid items in the Schedule, and failure to do so will render the Proposal informal and may be grounds for its rejection as non-responsive. The bidder shall state in words and figures the unit prices or the specific sums as the case may be, for which it proposes to supply the labor, materials, supplies, or machinery, and completely perform the Contract. The total amount of each item bid and the total amount of the bid shall be stated in words and figures.
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount named by a bidder for any items are not in agreement, the unit price alone will be considered as representing the bidder's intention and the total will be corrected to conform thereto.
PROPOSAL GUARANTEE – BIDDER’S SECURITY
Each bidder shall submit with his Proposal cash, an unconditional certified or cashier's check, or a bidder's bond, in the sum of the percentage of the bid stated in the Notice Inviting Bids, payable to the City as a guarantee that the bidder will, if its Proposal is accepted, execute the Contract and furnish a satisfactory Faithful Performance Bond, a satisfactory Payment Bond and insurance certificates as specified herein.
If a bidder to whom an award is made, fails or refuses to sign the Contract or furnish the required bonds and certificates, all within the time stated in Section 2-1.5 of the Special Provisions herein, the funds represented by said cash, check or bidder's bond shall be forfeited and become and remain the property of the City; the amount thereof being agreed to by the bidder and the surety as a bid bond forfeiture due to the City because of the delay in the execution of the Contract and in the performance of work thereunder, resulting from such failure or refusal, except that if the City awards the contract to the next lowest responsive responsible bidder, only that portion of the bidder's security equal to the difference between the two bids will be forfeited.
A Bid Bond must be obtained from a corporate surety authorized to do business as such in the State of California as an “admitted surety insurer” and shall be on the form furnished by the City or one substantially in conformance with it. Certified or cashier's checks must be drawn on a solvent state or nationally chartered bank or branch thereof in the State of California. The liability of the City in connection with the checks shall be limited to the return of the checks (without interest) as provided in Section 2-1.6 of the Special Provisions bound herein. iv
DISQUALIFICATION OF BIDDERS
A person, firm, or corporation shall NOT be allowed to make or file, or to be interested in, more than one bid, except an alternative bid when specifically requested; provided, however, a person, firm, or corporation who has submitted a sub-proposal to a bidder submitting a Proposal, or who has quoted prices on materials to such bidders, is not thereby disqualified from submitting a sub-proposal or from quoting prices to other bidders submitting proposals, or from submitting a Proposal as a prime contractor. Similarly, failure to comply with the registration requirements of Labor Code Section 1725.5, as further described in the Notice Inviting Bids, will disqualify a bidder.
ADDITIONAL REQUIREMENTS
The bidder's attention is directed to the Special Provisions and Technical Provisions bound herein for additional requirements of the Proposal and Contract Documents.
CONTRACT DOCUMENTS
Contract Documents are to be submitted within twenty-one (21) calendar days AFTER award of contract unless extended by agreement of the City. Failure to timely submit executed Contract Documents may be grounds for rejecting the bid award and forfeiture of the bid security. See enclosed documents commencing on page CD-1.
TO BE SUBMITTED WITH PROPOSAL
BP-1
BID PROPOSAL (BP)
PEDESTRIAN SAFETY
IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
PROJECT NO. JN 527
Contractor:
Address:
Phone:
Fax:
License No.:
D.I.R. No.
Email:
To Be Submitted
WITH
Bid Package
TO BE SUBMITTED WITH PROPOSAL
BP-2
BID PROPOSAL
PROJECT NO. JN 527_
BID SCHEDULE
The undersigned, having examined the proposed Contract Documents titled:
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
and having visited the site and examined the conditions affecting the work, hereby proposes and agrees to furnish all labor, materials, equipment, and appliances, and to perform operations necessary to complete the work as required by said proposed Contract Documents and itemized bid schedule below. All work shall be completed within Thirty (30) Working Days from the date the Notice of Proceed is issued by the Engineer.
Item
No. Item Description Unit
Approx.
Quantity
Unit Price
in Figures Item Total
1. Furnish and Install P.C.C. Curb and Gutter
over new C.A.B. per Dwg. ST-7 LF 42 $ $
2. Furnish and Install P.C.C. sidewalk over
existing re-compacted material per Std.
Dwg. ST-5A & ST-5B
SF 6152 $ $
3. Remove and dispose of existing tree,
stump and roots EA 6 $ $
4. Furnish and plant new trees per Dwg.
ST-11 (Australian & Desert Willow) EA 6 $ $
5. Furnish and Install 6” P.C.C. Residential
Driveway per Dwg. ST-2 SF 747 $ $
6. Furnish and Install 6” P.C.C. Commercial
Driveway per Dwg. ST-1A or ST-1B SF 200 $ $
TO BE SUBMITTED WITH PROPOSAL
BP-3
BID SCHEDULE (Continued)
TOTAL CONTRACT BID:
(Figures) $
(Words) ______
* In case of error in extension of price into the total price column, the unit price will govern.
All work required and shown on the construction plans and this specification for which no price or item is listed on this proposal, it shall be understood that such work, equipment, labor, tools and materials shall be provided without extra charge, allowance or direct payment of any kind. Payment for performing such work or furnishing such equipment, labor, tools and materials shall be included in the above lump sum or unit bid prices and no additional compensation will paid therefor.
If the City determines that any of the unit bid prices are significantly unbalanced to the potential detriment of the City, the bid will be replaced as non-responsive.
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the bidder’s intention and all totals will be corrected to conform thereto.
Attached hereto is cash, a certified check, a cashier's check, or a bidder's bond in the amount of _______________________________________________________________________Dollar s, said amount being not less than 10 percent of the amount bid. Pursuant to Public Contract Code Sections 20172 and 20174, it is agreed a portion equal to the difference between the low bid and second low bid shall be retained as a bid bond forfeiture by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.
Name of Bidder
Signature of Bidder
TO BE SUBMITTED WITH PROPOSAL
BP-4
BID PROPSOAL
PROJECT NO. JN 527_
ACKNOWLEDGEMENT OF ADDENDA RECEIVED
The Bidder shall acknowledge the receipt of addenda by number and date each addendum received.
Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addendum No. ____ Date ___________ Addenda will be issued only through the ARC Document Solutions and access under their “Planrooms”/”Order From Planwell” (https://www.e-arc.com/location/costa-mesa/). It is the Bidder’s sole responsibility to visit the Planroom to obtain and administer any Addendum related to this bid. An Addendum must be acknowledged above by a bidder in its submitted form of Proposal.
If an addendum or addenda has been issued by the City and not noted above as being received by the Bidder, the Bid Proposal may be rejected.
____________________________________ _____________________________ Bidder’s Signature Date
TO BE SUBMITTED WITH PROPOSAL
BP-5
BID PROPOSAL
PROJECT NO. JN 527_
BIDDER'S DECLARATION
It is understood and agreed that:
1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.
2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.
3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.
4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.
The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.
The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.
5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding. The undersigned has not in any manner sought by collusion to secure for himself any advantage over any other bidder.
6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the City after evaluation of the bids as submitted. The undersigned agrees that the City shall recover or retain as a bid bond forfeiture an amount equal to the difference between the low bid and amount of the bid of the bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest bidder in accordance with the provisions of the Public Contract Code Sections 20172 and 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.
TO BE SUBMITTED WITH PROPOSAL
BP-6
BIDDER'S DECLARATION (Continued)
7. The undersigned bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.
Respectfully submitted,
_______________________________ ______________________________________ Contractor's Business Name Contractor (Print) Title
________________________________ ______________________________________ Business Address: Street Signature Title
________________________________ ______________________________________ City State Zip Contractor's License No. and Classification ________________________________ ______________________________________ Business Phone Number Business Fax Number
Date
________________________________ ______________________________________ Name Title Residence: Street
________________________________ ______________________________________ City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the bidder, whose address must be given: if it is made by a firm, it must be signed in the copartnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each partner (general and/or limited) must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.
TO BE SUBMITTED WITH PROPOSAL
BP-7
BID PROPOSAL
PROJECT NO. JN 527_
NON-COLLUSION AFFIDAVIT
(To be executed by Bidder and submitted with Bid)
State of California
County of Los Angeles
being first duly sworn, deposes and
says that he or she is of
the party making the foregoing bid, that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, or agent thereof to effectuate a collusive or sham bid.
NAME OF BIDDER
SIGNATURE OF BIDDER
ADDRESS OF BIDDER
CITY STATE ZIP
ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)
TO BE SUBMITTED WITH PROPOSAL
BP-8
BID PROPOSAL
PROJECT NO. JN 527_
DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] The undersigned, a duly authorized representative of the contractor, certifies and declares that:
1. The undersigned contractor is aware of Sections 1777.1 and 1777.7 of the California Labor Code, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.
2. The undersigned contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.
3. The undersigned contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.” “(b) Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract, and any public money that may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the awarding body. The contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”
4. The undersigned contractor has investigated the eligibility of each and every subcontractor the undersigned contractor intends to use on this public works project, and has determined that none of them are ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this ______ day of _________, 20 _, at _________ _______ ________ (place of execution),
California__________.
Signature: ____________________________ Name: _________________________________ Title: ________________________________ Company: ______________________________
TO BE SUBMITTED WITH PROPOSAL
BP-9
BID PROPOSAL
PROJECT NO. JN 527
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT , as Principal,
and , as Surety,
are held firmly bound unto the City of Gardena in the sum of $ ;
DOLLARS,
(not less than ten percent of total amount of bid)
for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a bid to the City to perform all work required under the following:
PROJECT: PEDESTRIAN SAFETY IMPROVEMENT 2023/2024 VARIOUS LOCATION, JN 527
NOW, THEREFORE, if said Principal is awarded a Contract by the City and, within the time and in the manner required in the Specifications for said project, enters into the written form of Contract bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by the City and judgment is recovered, said Surety shall pay all costs incurred by the City in such suit, including a reasonable attorneys’ fee to be fixed by the court. Surety hereby waives the provisions of California Civil Code §2845.
SIGNED AND SEALED, this day of , 20 .
(SEAL) (SEAL)
Principal Surety
BY: BY:
Signature Signature
Note: This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney–in-fact must be attached.
TO BE SUBMITTED WITH PROPOSAL
BP-10
BID PROPOSAL
PROJECT NO. JN 527
DESIGNATION OF SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100- 4113 of the Public Contract Code of the State of California, and any amendments thereto, each bidder shall set forth below the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.
If the contractor fails to specify a subcontractor for any portion of the work to be performed under the contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.
Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the City.
Portion
of Work
% Subcontractor's Name & Address
Type of
Work
State
License
Number Class
D.I.R.
Number
Not more than _____%.
TO BE SUBMITTED WITH PROPOSAL
BP-11
BID PROPOSAL
PROJECT NO. JN 527
CONSTRUCTION PROJECT REFERENCE
In order to more fully evaluate your background and experience for the project herein proposed, please submit a list of Public Works and/or similar construction projects completed or in progress within the last three (3) years. Failure to provide this information may constitute grounds for rejection of your bid as non-responsive.
Number of years as a contractor in construction work of this type:
Three projects of this type recently completed:
1. Name (Firm/Agency):
Address:
Contact Person: Telephone No.:
Title of Project:
Project Location:
Date of Completion: Contract Amount: $
2. Name (Firm/Agency):
Address:
Contact Person: Telephone No.:
Title of Project:
Project Location:
Date of Completion: Contract Amount: $
3. Name (Firm/Agency):
Address:
Contact Person: Telephone No.:
Title of Project:
Project Location:
Date of Completion: Contract Amount: $
NOTE: If requested by the City, the bidder shall furnish a certified financial statement, references, and other information sufficiently comprehensive to permit an appraisal of his current financial condition.
Bidder's Signature
TO BE SUBMITTED WITH PROPOSAL
BP-12
BID PROPOSAL
PROJECT NO. JN 527
CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.
We agree specifically:
1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.
2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.
3. To take affirmative steps to hire minority employees within the company.
FIRM
TITLE OF PERSON SIGNING
SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:
TO BE SUBMITTED WITH PROPOSAL
BP-13
BID PROPOSAL
PROJECT NO. JN 527
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION – PRIMARY COVERED TRANSACTIONS
(BEFORE COMPLETING CERTIFICATION, READ INSTRUCTIONS ON NEXT PAGE) The Contractor shall not perform Work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. The Contractor and Subcontractors shall not be debarred or suspended throughout the duration of the Contract pursuant to Labor Code Section 1777.1 or any other federal or State law providing for the debarment of contractors from public works. If the Contractor or any Subcontractor becomes debarred or suspended during the duration of the Project, the Contractor shall immediately notify the City.
1. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals:
a. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
b. Have not within a 5-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statement, or receiving stolen property; c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph 1b of this certification; and d. Have not within a 5-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.
Signature: ____________________________ Name: _________________________________ Title: ________________________________ Company: ______________________________
TO BE SUBMITTED WITH PROPOSAL
BP-14
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION – PRIMARY COVERED TRANSACTIONS
(Continued)
INSTRUCTIONS FOR CERTIFICATION
1. By signing and submitting this proposal, the prospective primary participant is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective primary participant to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department or agency determined to enter into this transaction. If it is later determined that the prospective primary participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.
4. The prospective primary participant shall provide immediate written notice to the department or agency to which this proposal is submitted if at any time the prospective primary participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department or agency to which this proposal is submitted for assistance in obtaining a copy of those regulations (13 CFR Part 145).
6. The prospective primary participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.
7. The prospective primary participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-- Lower Tier Covered Transactions," provided by the department or agency entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the ineligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List.
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.
CD-1
CONTRACT DOCUMENTS (CD)
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
PROJECT NO. JN 527
To be Submitted
within twenty-one (21) calendar days
AFTER
Award of Contract
CD-2
CONTRACT DOCUMENT
PROJECT NO. JN 527
AGREEMENT
THIS AGREEMENT, made and entered into this day of , 20 , by and between CITY OF GARDENA in the State of California, hereinafter referred to as “CITY” and , hereinafter referred to as “CONTRACTOR.”
The City and the Contractor mutually agree as follows:
ARTICLE I.
THE PROJECT
For and in consideration of the mutual promises set forth herein, Contractor agrees to perform and complete in a good and workmanlike manner all work required by the Contract Documents for City Project No. JN 527 , which is described as follows:
Title: PEDESTRIAN SAFETY IMPROVEMENT 2023/2024 VARIOUS LOCATIONS, JN 527 Said work shall be performed in accordance with the Plans, Specifications and other Contract Documents, all of which are referenced in Article III hereof and incorporated herein as though fully set forth. Contractor shall furnish at its own expense all labor, materials, equipment and services necessary therefor, except such labor, materials, equipment and services as are provided in the Contract Documents to be furnished by City.
This project is subject to Skilled and Trained Workforce Requirements per Sections 2600 through 2603 of the Public Contract Code.
ARTICLE II.
CONTRACT SUM AND PAYMENT
For performing and completing the work in accordance with the Contract Documents, City shall pay Contractor, in full compensation therefor, the contract sum set forth in the Bidding Schedule. Said sum shall constitute payment in full for all work performed hereunder, including, without limitation, all labor, materials, equipment, tools and services used or incorporated in the work, supervision, administration, overhead, expenses and any and all other things required, furnished or incurred for completion of the work as specified in the Contract Documents. City shall make payments to Contractor on account of the contract sum at the time, in the manner, and upon the conditions specified in the Contract Documents.
ARTICLE III.
CONTRACT DOCUMENTS
The Contract Documents, which constitute the entire agreement between the City and the Contractor, are enumerated as follows: Proposal Documents, including the Notice Inviting Bids, Instructions to Bidders, Bidding Schedule, Bidder's Declaration, Designation of Subcontractors, Bidder's Assurance, and Fair Employment Practices documents; this Agreement; Standard Specifications; Special Provisions; Technical Provisions; Drawings; Plans; and all addenda issued prior to and all modifications issued after the execution of this Agreement. These form the Contract, and all are as fully a part of the Contract as if attached to this Agreement or repeated herein.
CD-3
ARTICLE IV.
EFFECTIVE DATE
This Agreement shall become effective and commence as of the date set forth below on which the last of the parties, whether City or Contractor, executes said Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by their proper officers thereunto duly authorized.
CITY CONTRACTOR
By: By:
MAYOR (Sign) Sign / Title
Date: Date:
SEAL
Attest: Attest: (Contractor)
By:
CITY CLERK (Sign) By:
Sign / Title
Date: Date:
APPROVED AS TO FORM:
By:
CITY ATTORNEY (Sign)
Date:
CD-4
CONTRACT DOCUMENT
PROJECT NO. JN 527_
FAITHFUL PERFORMANCE BOND
WHEREAS, the City of Gardena has awarded to ___ _____, hereinafter designated as the "Principal", a Contract for:
PROJECT: PEDESTRIAN SAFETY IMPROVEMENT 2023/2024, (AT VARIOUS LOCATIONS), JN 527
WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract;
NOW, THEREFORE, we,
as Principal, and
as Surety, are held and firmly bound unto the City in the sum of
Dollars ($ ), this amount being not
less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
In case suit is brought upon this bond, the Surety will pay all court costs and reasonable attorneys’ fees to the City of Gardena in an amount to be fixed by the court.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, well and truly keep and perform all the undertakings, terms, covenants, conditions and agreements in the said Contract and any alteration thereof, made as therein provided, all within the time and in the manner therein designated and in all respects according to their true intent and meaning, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
FURTHER, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849. The City is the principal beneficiary of this bond and has all rights of a party hereto.
CD-5
This bond shall remain in full force and effect for a warranty period of one full year after acceptance of the job by the City.
IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and Surety named herein, on the day of , 20 , the name
and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body. [PRINCIPAL]
By
Title
Signature
[SURETY]
By
Title
Address
Phone No.
Signature
All signatures must be notarized.
Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.
Corporations must affix corporate seal.
CD-6
CONTRACT DOCUMENT
PROJECT NO. JN 527
PAYMENT BOND
WHEREAS, the City of Gardena has awarded to , as
Contractor, a contract for the work described as follows:
PROJECT: PEDESTRIAN SAFETY IMPROVEMENT 2023/2024 VARIOUS LOCATIONS, JN 527
AND WHEREAS, said Contractor is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons, as provided by law;
NOW, THEREFORE, we, the undersigned Contractor and Surety, are held firmly bound unto the City in the sum of ,
Dollars ($ _____ ) this amount being not less than one hundred percent (100%) of the total Contract price, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if said Contractor, its heirs, executors, administrators, successors, assigns, or subcontractors shall fail to pay any of the persons named in Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, or any other amounts due to persons under any applicable project contract or law, with respect to such work and labor, then the Surety or Sureties herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, the said Surety will pay all court costs and reasonable attorneys’ fees to the plaintiff(s) and City in an amount to be fixed by the court.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 3181 as to give a right of action to such persons or their assigns in any suit brought upon this bond.
Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition, or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2845 and 2849.
CD-7
This bond shall remain in full force and effect for six full months after the period in which verified claims may be filed as provided for in Section 3184 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals on this day of 20 .
[PRINCIPAL]
By
Title
Signature
[SURETY]
By
Title
Address
Phone No.
Signature
All signatures must be notarized.
Appropriate modifications shall be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.
Corporations must affix corporate seal.
CD-8
CONTRACT DOCUMENT
PROJECT NO. JN 527
WORKER'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of the Contract.
DATED:
CONTRACTOR
By
Signature
Title
ATTEST:
By
Signature
Title
CD-9
CONTRACT DOCUMENT
PROJECT NO. JN 527_
INDEMNIFICATION AND HOLD HARMLESS AGREEMENT
AND WAIVER OF SUBROGATION AND CONTRIBUTION
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
VARIOUS LOCATIONS, JN 527
To the fullest extent permitted by law, Indemnitor hereby agrees, at its sole cost and expense, to defend, protect, indemnify, and hold harmless the City of Gardena and its respective elected officials, officers, attorneys, agents, employees, volunteers, successors, and assigns (collectively “Indemnitees”) from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith (collectively “Liabilities”), arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to any act, failure to act, error, or omission of Indemnitor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to the above-referenced contract, agreement, license, or permit (the “Agreement”) or the performance or failure to perform any term, provision, covenant, or condition of the Agreement, including this indemnity provision. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against an Indemnitee shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. Indemnitor shall pay Indemnitees for any attorney fees and costs incurred in enforcing this indemnification provision. Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a), or (b) the contracting public agency’s active negligence to the limited extent that the underlying Agreement is subject to Civil Code 2782(b). This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under the Agreement or any additional insured endorsements which may extend to Indemnitees.
Indemnitor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees. Accountants, attorneys, or other professionals employed by Indemnitor to defend Indemnitees shall be selected by Indemnitees.
In the event there is more than one person or entity named in the Agreement as an Indemnitor, then all obligations, liabilities, covenants and conditions under this instrument shall be joint and several. “Indemnitor”
Company/Contractor
Name & Title
Signature & Date
CD-10
CONTRACT DOCUMENT
PROJECT NO. JN 527
INSURANCE
CERTIFICATION OF INSURANCE (COI) SHALL BE SUBMITTED BY THE CONTRACTOR
1. COMMENCEMENT OF WORK. Contractor shall not be authorized to commence Work under this Contract until it has obtained approved insurance. Before beginning Work hereunder, during the entire period of this Contract, for any extensions hereto, and for periods after the end of this Contract as may be indicated below, Contractor must have and maintain in place not less than the insurance coverages required in this Section at his sole cost and expense. Contractor’s insurance shall comply with all items specified by this Contract. Any subcontractors shall be subject to all of the requirements of this Section and Contractor shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Contractor’s insurance may cover all subcontractors. The insurance requirements are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Contractor under this Contract.
2. INSURANCE COMPANY REQUIREMENTS. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.
3. COVERAGES, LIMITS AND POLICY REQUIREMENTS. Contractor shall maintain the types of coverages indicated below:
4. COMPREHENSIVE GENERAL LIABILITY INSURANCE. A policy of comprehensive general liability insurance written on a per occurrence basis in an amount not less than either one million dollars ($1,000,000) per occurrence or two million dollars ($2,000,000) aggregate.
5. COMMERCIAL AUTO LIABILITY INSURANCE. A policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, ed. 12/93, including Symbol 1 (any auto) with no special limitations affecting City. The minimum auto insurance coverage shall be one million dollars ($1,000,000) combined single limit per accident.
6. WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE. A policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars ($1,000,000) per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.
In accordance with the provisions of section 1860 of the California Labor Code, Contractor's attention is directed to the requirement that in accordance with the provisions of section 3700 of the California Labor Code, Contractor and every subcontractor will be required to CD-11
secure the payment of compensation of his or her employees, or obtain a certificate of consent to self-insurance by the Director of Industrial Relations in accordance with the requirements of Section 3700 of the California Labor Code.
In accordance with the provisions of section 1861 of the California Labor Code, Contractor shall sign and file with the awarding body the following certification prior to performing any work on the Project:
"I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."
7. POLICY REQUIREMENTS. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
(i) City and its appointed and elected officers, employees, agents and volunteers shall be added as additional insured to the policy as respects liabilities arising out of the performance of any work done under the Contract. (ii) The insurer shall agree to provide City with thirty (30) days prior written notice, return receipt requested, of any cancellation, non-renewal or material change in coverage.
(iii) For any claims with respect to the Project covered by this Contract, Contractor’s insurance coverage shall be primary insurance as respects City and its elected and appointed officers, employees, agents and volunteers. Any insurance or self-insurance maintained by City and its elected and appointed officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not contribute with it.
(iv) The policy shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company’s liability.
8. COURSE OF CONSTRUCTION INSURANCE. Contractor shall provide course of construction insurance covering for “all risks” of loss in the amount of the completed value of the Work. The City shall be named as a loss payee and the insurer shall waive all rights of subrogation against the City. This policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled until thirty (30) days written notice, return receipt requested, is mailed to the City. Course of Construction Insurance may be provided for each separate Phase.
9. ADDITIONAL REQUIREMENTS. The procuring of required insurance shall not be construed to limit Contractor’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Contract. City shall notify Contractor in writing of changes in the insurance requirements. If Contractor does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Contractor shall be deemed in default hereunder.
10. DEDUCTIBLES. Any deductible or self-insured retentions must be declared to and approved by City. Contractor shall guarantee that, at the option of the City, either: the insurer shall eliminate or reduce such deductibles or self-insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be CD-12
paid by Contractor); or Contractor shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses in the amount of any deductibles or self-insured retentions.
11. VERIFICATION OF COMPLIANCE. Contractor shall furnish City with the required endorsements attached hereto. All documents are to be received and approved by City before Work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Contract, Contractor shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefore, or accompanied by other proof of payment satisfactory to City. Contractor shall provide full copies of any requested policies to City within three (3) days of any such request by City.
12. TERMINATION FOR LACK OF REQUIRED COVERAGE. If Contractor, for any reason, fails to have in place, at all times during the term of this Contract, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Contractor’s expense and/or terminate this Contract. Contractor shall indemnify, defend and hold harmless City and its elected and appointed officers, employees, agents and volunteers from any claim resulting from failure of either Contractor or any subcontractor to take out or maintain any insurance required by this Contract.
13. EQUIPMENT COVERAGE. Any policy or policies of insurance Contractor or his subcontractors elect to carry as insurance against loss or damage to construction equipment and tools or other personal property shall include a provision waiving the insurer’s right of subrogation against City.
GP-1
GENERAL PROVISIONS
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
(JN 527)
PART 1 – GENERAL PROVISIONS
SECTION 1 – GENERAL
1-1 GENERAL. The Standard Specifications for Public Works Construction (“Greenbook”) written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California shall be the Standard Specifications of the City. All work shall conform to the 2021 edition, including supplements of the Standard Specifications, the Special Provisions which supplement or modify the Standard Specifications, and the Standard Drawings as issued by the City (defined herein as “Agency”) available at the time bids are opened unless otherwise specified in the Contract Documents.
The above referenced Standard Specifications, Special Provisions and Standard Drawings are hereby made a part of the Contract Documents.
For the convenience of the Contractor, the section and subsection numbering system used in these Special Provisions corresponds to that used in the Standard Specifications. 1-2 TERMS AND DEFINITIONS. Whenever in the Standard Specification the following terms are used, they shall be understood to mean and refer to the following:
(a) AGENCY The City of Gardena, a California municipal corporation. (b) BOARD The City Council of the City of Gardena
(c) CONTRACT Documents including but not limited to the proposal forms, DOCUMENTS Standard “Greenbook” Specifications, Special Provisions, Technical Provisions, Notice Inviting Bids, Instructions to Bidders, Bonds, Insurance, Contract and all Addenda
setting forth any modifications of the documents.
(d) ENGINEER The City of Gardena Director of Public Works/City Engineer or his authorized representative.
(e) BIDDER An individual, co-partnership, association or corporation submitting a proposal for the work contemplated, acting directly or through a duly authorized representative.
(f) LEGAL ADDRESS The legal address of the Contractor to be the address OF CONTRACTOR given on the Contractor’s bid and is hereby designated as the place to which all notices, letters or other
communications to the Contractor shall be mailed or
delivered.
(g) LABORATORY An established laboratory approved and authorized by the Engineer for testing materials and work involved in the contract.
GP-2
1-7 AWARD AND EXECUTION OF THE CONTRACT.
1-7.1 General. The proposal shall be fully executed and submitted on the forms provided by the Agency and shall be enclosed in a sealed envelope marked and addressed as directed in the “Notice Inviting Bids”.
If the proposal is made by an individual, it shall be signed and his or her full name and address shall be given; if it is made by a firm it shall be signed with co-partnership name by a general partner thereof, who shall also sign his or her known name, and the name and address of each member of such co-partnership shall be given; if made by a corporation, the name of the corporation shall be signed by its duly authorized officers and attested by the corporate seal.
Bidders are warned against making erasures or alterations of any kind on their Proposal.
Proposals which contain omissions, erasures, alterations, conditions or additions not called for may be rejected.
At the time the Contract is awarded by the Agency, the Contractor shall be licensed under the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California to do the type of work contemplated in the Contract and shall be skilled and regularly engaged in the general class or type of work required by this Contract. 1-7.2 Contract Bonds. The “Performance Bond” is equivalent to City’s “Faithful Performance Bond”.
1-7.3 Examination of Plans, Specifications and Project Site. Bidders shall read the specifications, review the drawings and examine the existing facilities to fully understand the project in order to plan for the improvements as shown in the contract, including local condition, uncertainty of weather and all other contingencies.
Bidders shall satisfy themselves by personal examination of the proposed work sites, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Proposal forms. Information derived from the maps, plans, specifications, profiles, drawings, or from the Engineer/Architect of the record, shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not guaranteed nor is any liability assumed by the Agency. 1-7.4 Interpretation of Drawings and Documents. If a prospective bidder is in doubt as to the true meaning or intent of any part of the Contract Documents including the Specifications, or discovers discrepancies in, or omissions from, the Specifications or Drawings, he may submit to the Engineer a written request for an interpretation or a correction thereof. Interpretations or corrections of the Contract Documents including the Specifications and Drawings, shall be made only by addendum duly issued by the Engineer, and a copy of such addendum will be sent by certified mail, postage prepaid, or delivered to each person receiving a set of the Contract Documents whose address is known to the Engineer and such addendum shall be considered a part of and incorporated in the Contract Documents. 1-7.5 Award of Contract. After the Proposals have been publicly opened and read aloud, they will be checked for accuracy and compliance with all provisions as specified herein.
The Agency reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received.
Bids subsequently shown to be mathematically unbalanced would be rejected as GP-3
nonresponsive.
A mathematically unbalanced bid is one containing lump sum or unit bid items which do not reflect reasonable actual costs plus a reasonable proportionate share of the bidder’s anticipated profit, overhead costs, and other indirect costs, which he/she anticipates for the performance of the items in question.
“A bid is mathematically unbalanced if the bid is structured on the basis of nominal prices for some work and inflated prices for other work; that is, each element of the bid must carry its proportionate share of the total cost of the work plus profits.” “A bid is materially unbalanced if there is a reasonable doubt that award to the bidder submitting the mathematically unbalanced bid will result in the lowest ultimate cost to the Government.
Consequently, a materially unbalanced bid may not be accepted.” Award of the Contract, if it be awarded, will ordinarily be made by the Agency within 30 days after opening of the bids. Award will be made to the lowest responsive responsible bidder.
In selecting the lowest responsive responsible bidder, consideration will be given to the general competency of the bidder for the performance of the work covered by the proposal. To receive favorable consideration, a bidder may be required to present evidence that he has successfully performed similar work of comparable magnitude or submit other evidence satisfactory to the Agency that he or his associates are competent to manage the proposed undertaking and to carry it forward to a successful conclusion. Professional integrity and honesty of purpose shall be essential requirements. A showing of adequate financial resources may be required but will not alone determine whether a bidder is competent to undertake the proposed work.
Only manufacturers or contractors of established reputation, or their duly authorized dealers or agency, having proper facilities for the manufacture of the materials or equipment and for servicing same, or for proper execution of the work called for in the contract, will be considered in making the award.
1-7.6 Execution of Contract. A bidder whose proposal is accepted shall properly sign a written contract with the Agency on the form attached hereto and return said contract together with good and approved bonds and insurance certificates as required by the Contract Documents within twenty-one (21) calendar days from the date of the mailing of a notice from the Agency to the bidder, according to the address given by him, of acceptance of his proposal.
Contract bonds and certificates of insurance, if required, shall be filed in all instances before delivering any equipment, materials, or performing any work under the contract; also before any purchase order shall be issued. An executed Power of Attorney form shall be submitted with all contract bonds herein specified.
If a bidder whose proposal is accepted fails or refuses to enter into a contract as herein provided, or to conform to any stipulated requirement in connection therewith, the money represented by his check or bidder’s bond shall be refunded less the difference between the low bid and the bid of the bidder with whom the Agency enters into an agreement in accordance with the provisions of the Public Contracts Code Section 20174. At the discretion of the Agency, an award may be made to the bidder whose proposal is next most acceptable to the Agency, and such bidder and his surety shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made.
A corporation to which an award is made may be required before the contract is finally signed to furnish evidence of its corporate existence, of its right to do business in California and of the authority of the officer signing the contract and bonds for the corporation to so sign.
GP-4
1-7.7 Return of Proposal and Guarantee. The check or bond of a bidder to whom the contract has been awarded will be returned to him after all of the acts, for the performance of which said security is required, have been fully performed. The checks or bid bonds of the second and third lowest bidders will be returned when the bidder to whom the contract has been awarded has properly executed all of the required Contract Documents. Check or bid bonds of other bidders will be returned when their proposals are rejected or in any event at the expiration of forty-five (45) days from the date of opening bids.
1-7.8 Precedence of Contract Documents. The order of precedence of contract document shall be:
FIRST Requirements of law, including the Code and Ordinances of the City of Gardena.
SECOND Permits from other agencies as may be required by law.
THIRD Permits from City of Gardena Departments as may be required by law or ordinance.
FOURTH The Contract.
FIFTH The Bid Proposal.
SIXTH Addenda.
SEVENTH Notice Inviting Bids.
EIGHTH Instructions to Bidders.
NINTH Technical Provisions.
TENTH Plans.
ELEVENTH General Provisions of the Standard Specifications.
TWELFTH Standard Plans.
THIRTEENTH Standard Specifications for Public Works Construction (current edition).
FOURTEENTH Caltrans Standard Plans and Specifications.
FIFTEENTH Reference Specifications.
Change orders, supplemental agreements and approved revisions to Plans and Specifications will take precedence over documents listed above, except those listed as FIRST, SECOND and THIRD. Detailed plans shall have precedence over general plans.
SECTION 2 – SCOPE OF THE WORK
2-2 PERMITS. The Contractor will obtain, at no cost to the Agency, all permits necessary to perform the work on streets, highways, railways or other rights-of-ways. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not GP-5
limited to those permits required for night work, overload, blasting and demolition. For private contracts, the Contractor shall obtain all permits incidental to the work or made necessary by its operations, and pay all costs incurred by the permit requirements.
The Contractor and each subcontractor employed upon the work must have or obtain a valid City of Gardena Business License in accordance with the provisions of the Gardena Municipal Code.
2.10 DISPUTED WORK.
2.10.1 Retention of Imperfect Work. If any portion of the work done or materials furnished under the contract proves defective or not in accordance with the specifications and contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if the removal of such work is impracticable or will create conditions which are dangerous or undesirable in the opinion of the Engineer, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make deductions therefor in the payment of the contract item due Contractor as may be just and reasonable. 2-11. DISPUTE RESOLUTION.
2-11.1 Requests for Contract Adjustments and Relief. If either Contractor or the Agency believes that it is entitled to relief against the other for any event arising out of or related to the work or Project, such party shall provide written notice to the other party of the basis for its claim for relief. Such notice shall, if possible, be made prior to incurring any cost or expense and in accordance with any specific notice requirements contained in the applicable sections of this Contract.
In the absence of any specific notice requirement, written notice shall be given within a reasonable time, not to exceed fourteen (14) days, after the occurrence giving rise to the claim for relief or after the claiming party reasonably should have recognized the event or condition giving rise to the request, whichever is later. Such notice shall include sufficient information to advise the other party of the circumstances giving rise to the claim for relief, the specific contractual adjustment or relief requested and the basis of such request. 2-11.2 Dispute Avoidance and Resolution. The parties are fully committed to working with each other throughout the Project and agree to communicate regularly with each other at all times so as to avoid or minimize disputes or disagreements. If disputes or disagreements do arise, Contractor and the Agency each commit to resolving such disputes or disagreements in an amicable, professional and expeditious manner so as to avoid unnecessary losses, delays and disruptions to the work under the Contract.
Contractor and the Agency will first attempt to resolve disputes or disagreements at the field level through discussions between Contractor’s Representative and the Engineer.
If a dispute or disagreement cannot be resolved through the Contractor’s Representative and the Engineer, Contractor’s Chief Executive Officer or similar senior representative and the Gardena City Manager, or designee, upon the request of the other party, shall meet as soon as conveniently possible, but in no case later than twenty (20) days after such a request is made, to attempt to resolve such dispute or disagreement. Prior to any meeting between the parties’ senior representatives, the parties will exchange relevant information that will assist the parties in resolving their dispute or disagreement.
If, after meeting, the senior representatives determine that the dispute or disagreement cannot be resolved on terms satisfactory to both parties, the parties may submit the dispute to binding GP-6
or non-binding mediation. The mediation shall be conducted in any manner and by any person or mediation association mutually acceptable to the parties. 2-11.3 Arbitration. Any claims, disputes or controversies between the parties arising out of or relating to the Contract, or the breach thereof, which have not been resolved in accordance with the procedures set forth in Section 2-11.2 above may be decided by binding or non-binding arbitration. The arbitration shall be conducted in any manner and by any person or arbitration association mutually acceptable to the parties.
2-11.4 Claims Disputes. Any claims of Contractor, as “claims” are defined in California Public Contract Code Section 9204 shall be processed in accordance with that section. Section 9204 provides in relevant part that upon receiving a claim from a contractor, together with reasonable documentation to support the claim, a contracting public entity shall conduct a reasonable review of the claim and, within a period not to exceed 45 days [except as otherwise provided in Section 9204], shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed.
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, Section 2-11.3 shall apply. If the contractor disputes the public entity’s written response, or if the public entity fails to respond to a claim within the time prescribed, the contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.
Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed.
Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the contractor sharing the associated costs equally. The public entity and contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to other applicable procedures.
2-13 DRAWINGS AND SPECIFICATIONS (“RECORD” DRAWINGS). At all times, the Contractor shall maintain at the project a “Record” set of Drawings and Specifications to include all executed addenda, change orders, and field orders.
Prior to each progress payment the Contractor shall deliver to the Engineer, a set of contract drawings with all applicable “as constructed” notes placed/recorded thereon. Failure to provide “as constructed” plans will cause progress payment to be withheld until information is provided to City.
After completion of the work and before final payment, the Contractor shall deliver to the Engineer a complete set of contract drawings with all applicable “as constructed” noted placed/record thereon. The final form and detail of these as constructed plans are subject to the GP-7
acceptance of the Engineer.
2-14 MARKING REMOVAL. All markings placed by the Contractor, City, and Underground Service Alert (USA) during construction shall be removed at the completion of the work. These markings shall include, but not limited to, paint, stakes, and metal tags.
All cost associated with removal of markings shall be included in the bid prices for the applicable bid items. Failure of the Contractor to remove these markings shall be cause for the City to do the work and withhold the costs from the Contractor’s final payment.
SECTION 3 – CONTROL OF THE WORK
3-5 INSPECTION. Inspection shall be made once a day for areas ready for inspection. Areas or items that fail inspection or that are not ready for inspection shall be rescheduled by the contractor.
Inspection of the work shall not relieve the contractor of the obligation to fulfill all conditions and requirements of the contract.
3-6 THE CONTRACTOR’S REPRESENTATIVE. The Contractor shall furnish the Engineer with the name, address and cell/ business/home telephone numbers of the person responsible for the maintenance of barricades, traffic control signs, lights and other safety devices. 3-10 SURVEYING.
3-10.3 Line and Grade. Unless otherwise provided in the Technical Provisions, establishing lines and grades for construction shall be the responsibility of the Contractor, with the following provisions:
All work under this contract shall be built in accordance with the lines and grades shown on the plans. Field survey for establishing these, and for the control of construction, shall be the responsibility of the Contractor. All such surveys, including construction staking, shall be performed on all items ordinarily requiring grade and alignment, at intervals normally accepted by the agencies and trade involved.
The Contractor shall provide a copy of the office calculations and grade sheets to the Agency’s Inspector. The Contractor shall be responsible for any error in the finished work, and shall notify the Engineer within 24 hours of any discrepancies or design errors discovered during staking.
Unless a separate bid item is provided, the payment for surveying, construction staking, professional services, office calculations, furnishing all labor, materials, equipment, tools and incidentals, and for doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed therefor. 3-10.4 Permanent Survey Markers. The Contractor is required to locate and tie out survey monuments in the project area prior to construction involving street and highways, or City public right of way and to file with the County Surveyor a Corner Record of any such work. Prior to final payment and the issuance of a completion certificate, the Contractor is required to file a Corner Record for survey monumentation that is replaced. All such survey work shall be performed under the supervision of a California licensed Land Surveyor or a Civil Engineer authorized to perform such work.
The Contractor shall provide the Agency a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work.
GP-8
The payment for surveying, related professional services, office calculation, furnishing all labor, materials, equipment, tools and incidentals, and for doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed therefor.
3-12 WORK SITE MAINTENANCE.
3-12.1 General. The Contractor shall keep the work site clean and free from rubbish and debris.
The Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling with water in keeping with the AQMD and NPDES requirements. Debris, soil or other matter shall not be washed into storm drains but shall be collected and disposed of in a legal, responsible manner.
The construction area shall be cleaned with a power sweeper at the end of every workday and when deemed necessary by the Engineer.
The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Use temporary sandbags to control the site perimeter. At the completion of the project sandbags shall become the property of the City of Gardena and shall be remain in place.
The Contractor shall not spill on haul routes. Any such spillage shall be removed immediately and the area cleaned.
Stockpiling of construction materials or debris on City right-of-way shall be in accordance with the NPDES permit and shall be approved by the inspector. At the completion of work, the Contractor shall thoroughly clean all work areas.
3-12.2 Air Pollution and Surface Maintenance Control. The Contractor shall obtain a construction water meter from Golden State Water including required deposit and fees. The Contractor shall pay for the water used, at the current water rates. All arrangements for construction water shall be made by contractor with Golden State Water at Contractor expense. 3-12.4. Storage of Equipment and Material.
3-12.4.1 General. All costs associated with the disposal of all excavated or demolition materials, including any gate fees, shall be paid by the Contractor. These costs shall be included in the bid price for the applicable bid items.
Prior to any excavated or demolition material being removed from the construction site the Contractor shall notify the City as to the hauling route and destination for disposal. If the location for disposal is other than a county landfill then the Contractor shall provide the City with written permission and release of liability for the City from the owner of the property where the material will be deposited.
The City has an exclusive agreement with Waste Resources, Inc. and no other firm may provide bulk trash bins in the event the work requires this service. 3-12.4.2 Storage in Public Streets. Construction equipment shall not be stored at the construction site, any public street or publicly owned facilities without approval of the City.
Contractor shall store equipment at a contractor’s rental yard.
All excavated material that is to be hauled to and disposed of at a County landfill site by the Contractor is subject to a County gate fee based on tonnage. 3-12.5.4 Protection and Restoration of Existing Improvements. Any facilities, GP-9
structures, water lines, landscaping, surfaces, signs, pavement markings, painted curbs, house numbers, etc., which are damaged during construction shall be restored to the satisfaction of the City. Damaged water lines shall be repaired immediately at no additional cost to the city. 3-12.5.5 Access to Private Property. The Contractor shall be aware that business and residential access must be maintained at all times. The Contractor shall schedule operations to minimize interference with access to private property.
The main access way to any business or home shall not be completely blocked for more than one four-hour period a day except blockage shall be limited to one twenty-four (24) hour period when concrete is poured.
Temporary access ways shall be provided from the street to the main access way of all businesses and homes by use of traffic rated steel plates or any other method approved by the city.
Payment for this item shall be included in the applicable contract work item. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.3 Warranty. In addition to the guarantees as required in Section 1-7.2 and 3-13.3 of the Standard Specifications, the Faithful Performance Bond shall remain in full force and effect for a period of one year after acceptance of the work by the Agency to insure that defects, which may appear within said period, will be repaired, replaced, or corrected by the Contractor, at his own cost and expense, to the satisfaction of the Engineer within thirty (30) days after written notice thereof by the Agency.
SECTION 4 – CONTROL OF MATERIAL
4-1 GENERAL.
4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier.
The Contractor warrants clear and good title to all materials, supplies and equipment installed and incorporated in the work, and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him to the Agency free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon; provided, that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this section, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Agency.
The provisions of this section shall be inserted in all subcontractor’s and material contracts, and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into regarding such materials.
GP-10
SECTION 5 – LEGAL RELATIONS AND RESPONSIBLITIES
5-4 INSURANCE. In lieu of Section 5-4 of the Standard Specifications, refer to the City Contract Documents Section, CD-10, for detail requirements. 5-5 ANTITRUST CLAIMS. By entry into this Contract, Contractor hereby acknowledges the terms of Section 7103.5 of the Public Contract Code and hereby offers and agrees to assign to the Agency all rights, title and interest in all causes of action it may have as outlined above. 5-7 SAFETY.
5-7.4 Hazardous Substances. As required by Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify the Agency of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by the Agency; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, the Agency shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all work to be performed under the Contract but shall retain all rights provided by the Contract and by law for making protests and resolving the dispute. 5-7.4.1Edison Energized Conductors. Contractor hereby promises and agrees that in the performance of the work specified in this Contract, it will employ and utilized only qualified persons, as hereinafter defined, to work in proximity to Edison’s secondary, primary and transmission facilities. The term “qualified person” is defined in Title 8, California Administrative Code, Section 2700, as follows:
“Qualified Person: A person who by reason of experience or instruction is familiar with the operation to be performed and the hazards involved.” Contractor further promises and agrees that the provisions of this section shall be and are binding upon any subcontractor or subcontractors that may be retained by it, and that Contractor shall take such steps as are necessary to assure compliance by said subcontractor or subcontractors with the requirements of this section. 5-7.4.2 Emergency Provisions. Unusual conditions may arise on the work which will require that immediate and unusual provision be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.
Whenever, in the opinion of the Agency, an emergency exists of which the Agency is aware and against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by the progress of construction; and whenever, in the opinion of the Agency, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the Contract, then in that event the Agency may provide suitable protection to said interests by causing such work to be done and material to be furnished, as in the opinion of the Agency may seem reasonable and necessary, all at the expense of the Contractor.
GP-11
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule. The Contractor’s proposed construction schedule shall be submitted to the Engineer within fourteen (14) calendar days after the date of the contract execution. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.
The Contractor shall include in his bid all costs to perform the work under this contract in stages.
The Contractor shall begin and complete work in each stage prior to starting work in subsequent stages unless previous permission is obtained from the Engineer. The contractor shall stage the work to allow parking on the next adjacent streets. Restricting parking on multiple adjoining streets shall require approval of the engineer.
6-1.2 Commencement of the Work. City may establish a Notice to Proceed (NTP) date no later than thirty (30) calendar days after the date of the contract execution. Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods and clarify inspection procedures.
The names, addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Public Works Manager and the County Sheriff’s Department or the City Police Department prior to beginning work.
The Contractor shall also notify the City of Gardena and the owners of all utilities and substructures within the Project area not less than 48 hours prior to starting construction. The following utility companies list of names and telephone numbers is intended for the convenience of the contractor and is not guaranteed to be complete or correct:
COMPANY CONTACT TELEPHONE NO.
Southern California Edison Manuel Vargas, Jr. 310.783.9389 Southern California Gas Melissa Fukunaga: Tech Services Planning: Attn - Lead Planner
213.231.7281
AT&T Marco A. Perez 626.491.5503
Raymond Dover 310.515.4257
Gardena Police Dispatch 310.3237911
L.A. County Fire Dept. 310.323.7911
Time Warner
Communications Arturo Fernandez 310.750.9099
Crown Castle Hector Aguilera 951.454.5111
Waste Resources of Gardena Lorena Rodriguez 310.366.7600 Golden State Water Co. Justin Doronio 310.436.6950 x111 Joseph Salcido 310.660.0320 x101
L.A. County Flood Control Daryll Chenoweth 626.458.3129 L.A. Sanitation District Jon Ganz 562.908.4288
Metropolitan Water District Civil Eng. Substructures Section 213.217.7059 Chevron Pipeline Dave Zerler 310.669.4014
Underground Service Alert 800.422.4133
The Contractor shall submit periodic Progress reports to the Engineer by the tenth day of each GP-12
month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-1.3 Working Day. The Contractor’s working hours shall be limited to the hours between 7:30 A.M. and 4:30 P.M., Monday through Friday except holidays. No work which will cause loud or disruptive noise to adjacent residents and “No Parking” enforcement shall begin prior to 8:00 a.m. nor terminate later than 4:30 p.m. Deviation from normal working hours will not be allowed unless written permission has been duly obtained beforehand from the office of the City Engineer. The Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and the public, and for proper inspection.
If the Contractor works beyond the allowed working hours without prior written approval from the Engineer, the Contractor may be charged Five Hundred ($500) for each occurrence as required by the Engineer. The amount will be deducted from a progress payment or bond.
Contractor hereby acknowledges and shall be required to comply with the provisions of California Labor Code Section 1810 et seq. According to those sections, eight (8) hours of labor shall constitute a legal day’s work. Contractor shall pay to the Agency a penalty of Twenty-Five Dollars ($25.00) for each worker employed in the execution of this Contract by Contractor, or by any Subcontractor, for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day or forty (40) hours in any one (1) calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.
In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead and travel time. The service fees will be deducted from any amounts due to the Contractor.
6-1.4 Notice and Service Thereof. Any notice required or given by one party to the other under the contract shall be in writing and shall be dated and signed by the party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:
Notice shall be given to the Agency by personal delivery thereof to the City of Gardena Engineer or by depositing the same in the United States mail enclosed in a sealed envelope, registered and with postage prepaid, addressed to:
Public Works Department
City of Gardena
1717 W. 162nd Street
Gardena, CA 90247-3778
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the site of the project, or by depositing the same in the United States mail, enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of the work under this Contract, postage prepaid and registered.
Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated to the party giving the notice, postage prepaid and registered.
GP-13
Notification of Property Owners and Tenants - The Contractor shall notify each property owner and/or tenant in the project area in writing five (5) working days prior to the start of construction.
If pedestrian or vehicular access to private property is to be blocked, the Contractor shall again notify each property owner and/or tenant in writing five (5) working days prior to construction activities. The Contractor shall provide additional notices when a lapse time occurs during each phase/segment work.
The written notice shall be submitted to the Engineer for approval prior to being delivered.
6-2 PROSECUTION OF THE WORK.
6-2.1 Contractor’s Responsibility for Work. Until the formal acceptance of the work by the Agency, the Contractor shall have the charge and care thereof and shall, subject to the insurance protection furnished in accordance with the Section 1-7.6 and 5-4 hereof, bear the risk of accident, loss or damage to any part thereof by action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore and otherwise correct damages to any portion of the work occasioned by any of the above causes before its acceptance.
In case of suspension of work from any cause whatsoever, the Contractor shall be responsible for all materials and the proper temporary storage thereof. 6-3 TIME OF COMPLETION.
6-3.1 General. The contract time shall begin per the City’s written notification. Work must be completed within working days specified for the project. In addition, the Contractor shall notify the City 24 hours in advance of the actual commencement of work.
No work shall be undertaken during the City’s holiday closures. It is the Contractor’s responsibility to determine the City’s closure dates.
6-9 LIQUDATED DAMAGES. The amount of liquidated damages is hereby amended to $500.00 for each consecutive calendar day.
SECTION 7 – MEASUREMENT AND PAYMENT
7-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK.
7-1.2 Method of Measure. The quantities shown on the Bid Schedule are approximate only. The Contractor will be paid for the actual quantities of work based on approved field measurements as provided for in these Specifications. The City reserves the right to increase or decrease the amount of any item or portion of work to be performed or materials furnished, or to delete any item, in accordance with the Specifications. Additional bid item work shall be completed within the total working days in these specifications. Additional working days maybe allowed with the approval of the engineer.
7-3 PAYMENT.
7-3.2 Partial and Final Payment. The Engineer will authorize monthly partial/progress payments per Section 7-3.2 of the Standard Specifications. Contractor’s monthly invoice shall be submitted on company letterhead. Each invoice submitted shall include: project name, date of invoice, progress payment number, and purchase order number. All bid items shall be GP-14
included on each invoice and include unit, unit price bid, original quantity, amount, previous payment quantity and amount, current invoice payment quantity and amount, total project payment quantity and amount. In addition, any approved change orders shall be listed on invoice. Payment to Contractor typically takes 30 days from submittal of approved invoice.
However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents.
7-3.3 Delivered Materials. The City will NOT honor or make any progress payments for materials ordered and delivered to the job site by the Contractor unless prior approval is obtained from the Engineer.
7-4 PAYMENT FOR EXTRA WORK.
7-4.3 EXTRA WORK. When work is performed on a "time and materials" basis, the following percentages shall be added to the Contractor's cost and shall constitute the markup for all overhead and profits:
1) Labor ...........................................................20 2) Materials ...........................................................15 3) Equipment Rental .........................................................15 4) Other Items and Expenditures ..................................... 15 To the sum of the costs and markups provided for in this section, 1 percent shall be added as compensation for bonding.
When all or any part of the extra work is performed by a Subcontractor, the markup established above shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
SECTION 8 – FACILITIES FOR AGENCY PERSONNEL
8-2 FIELD OFFICE FACILITIES. The Contractor shall provide the class of field office indicated below:
Class "A" Class "B" Class "C"
In the event none of the boxes are marked above, no specific field office will be required, and the use therefor of any field office will be at the Contractor's discretion. The location of any field office shall be as provided on the plans, in these Specifications or as designated by the Engineer.
END OF GENERAL PROVISIONS
TP-1
TECHNICAL PROVISIONS
PEDESTRIAN SAFETY IMPROVEMENT 2023/2024
(AT VARIOUS LOCATIONS)
(JN 527)
PART 1 – TECHNICAL PROVISIONS
SECTION 1 – GENERAL
PREFACE: All work and materials shall conform to the "Standard Specification for Public Works Construction", 2021 edition, except as modified by the contract and these Technical Provisions.
Incidental Work - All work and materials required by the plans and specifications, and not specifically listed in the bid schedule items of work, shall be considered incidental and no additional payment shall be made therefore. Incidental items shall include, but are not limited to, mobilization; implementation of the SWPPP and Best Management Practices for the protection of storm drain structures; adjusting utility access covers to grade; saw cutting; excavation and disposal of materials; survey; traffic control and coordination of utilities.
PART 2 – CONSRTUCTION MATERIALS
SECTION 200 – ROCK MATREIALS
200-2. UNTREATED BASE MATERIAL
200-2.1 General. The Contractor shall furnish Certified Weight Tickets for material delivered to the job site and deliver it to the Engineer or his representative before the end of the working day.
The City may hire a qualified soils engineer to perform all tests. If the material furnished by the Contractor fails any tests, the Contractor shall remove said material and shall complete the construction of the base with material acceptable to the Engineer at no extra cost to the City.
Costs for base material shall be incidental and included in the bid item of work for which it is required, and no additional payment will be allowed therefore.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1.2 Concrete Specified by Class and Alternate Class. Concrete shall be 520-C-2500 for curb-gutter, curb ramps, driveways, sidewalk and concrete pavement. Curing compound shall be Type 2 (if required).
SECTION 203 – BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE.
203-6.4.1 Class and Grade. Asphalt hot mix shall be C2-PG64-10 for capping or finish course.
Feather join edges shall be made along straight lines by hand raking out all heavy aggregates prior TP-2
to rolling to produce a smooth uniform surface. Compacted edge along gutter lip shall be 3/8 inch in height.
PART 3 – CONSTRUCTION METHODS
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING.
In addition to the work outlined in Section 300-1, the following items of work are included under "Clear and Grub":
A. Providing clean topsoil and grading of parkways as directed by the Engineer to restore the parkway grades.
B. Replacement of damaged pipe curb drain, as well as the coring and/or reinstatement of pipe curb drains.
C. Protection or replacement of brick banding on driveway.
D. Protection of fences adjacent to and within the public right-of-way.
E. Relocation of existing signs and warning devices (City shall provide new poles as required.)
F. Painting new and repainting existing curb markings such as yellow, blue, white, green or red curb as well as curb addresses
G. Protect existing private/public irrigation systems, and repair irrigation systems damaged during construction.
H. Protection of all existing improvements (public or private), unless shown to be removed/relocated/adjusted as part of the construction. The Contractor shall repair or replace these items if damaged with new materials equal to the original or better, as required by the Engineer.
I. Protection of all utilities, walls, fences, hedges, buildings, concrete slabs, planters, and other private or public improvements not specifically shown to be removed as part of the construction. The Contractor shall replace these items, if damaged, with new material equal to the original or better, as required by the Engineer.
J. All complaints/claims resulting from reconstruction of concrete improvements will be forwarded to the Contractor. The complaint/claim will be fully rectified or the City will repair the item and deduct that amount from progress payment. 300-1.1.a General.
All existing improvements, including those on private property, shall be protected in place. Any damage to and removal of these improvements shall be repaired and replaced by the Contractor at his expense.
All excavated material shall be immediately hauled away and disposed of outside the project limits. The Contractor shall be responsible for all damages and claims that may arise as a result of this disposal.
300-12 EXCAVATION. Roadway excavation shall include sawcutting, excavating, removing, hauling, and disposing of all soil materials, existing asphaltic concrete pavement, PCC pavement, subgrade and similar appurtenances which are to be removed for construction of the street reconstruction as shown on the Plans. Earthwork, subgrade preparation and finishing roadway shall confirm to the applicable requirements of Section 300 and 301 and other TP-3
pertinent sections of the Standard Specifications for the various items involved. Payment for excavation shall be incidental and included in the appropriate unit price bid. 300-12.1 Asphalt Pavement Removal. The edges of asphalt pavement remaining in place shall be sawcut and shall have clean, solid vertical faces. The edges of asphalt pavement broken during construction shall be resawn and removed before surfacing material is placed at the expense of the Contractor.
All edges shall be parallel or perpendicular to curb faces except cuts around objects shall be on a curvilinear cut, a maximum 4 inches departure from the straight cut every 2 feet. 300-12.2 Concrete Removal. Concrete to be removed shall be sawcut to a minimum depth of 5 inches at score marks or as marked by the City. Sawed edges, broken or chipped during construction shall be resawn at the contractor's expense. Increase in concrete quantity due to resawing shall not be considered for payment. Upon concrete removal, the City Parks Superintendent shall be informed to check and approve all roots to be removed. If he determines the tree cannot be saved, removal and planting of a new tree shall be per unit cost.
All edges shall be parallel or perpendicular to curb faces except cuts around objects shall be on a curvilinear cut, a maximum of 4 inches departure from the straight cut within every 2 feet. The edges of Portland cement concrete remaining in place shall be sawcut and shall have clean, solid vertical faces.
The Contractor is responsible for inspecting each location prior to submitting a bid.
Excavation in the street section adjacent to concrete replacement shall be a minimum width of 1-foot and a minimum depth of 6-inches or 1-inch greater than the existing AC section if greater than 6-inches in depth.
Remove and replace defective concrete work with new materials. Permission to patch any defective areas shall not be a waiver of the Engineer's right to require complete removal of defective work if patching does not restore quality and appearance of work.
The Contractor may stockpile sand or clean fill dirt within the street, except arterial streets, between the curb and 8-feet out, for no longer than 72 hours in any one location with prior approval by the Engineer. The Contractor shall notify the fronting residence 24 hours prior to stockpiling any material. Said stockpile shall not block the flow line of the gutter and shall be barricaded with flasher-equipped barriers. The Contractor shall ensure that the street is swept clean upon vacating the stockpile site. No excavated or removed dirt or concrete may be stockpiled in any street overnight.
The Contractor shall remove all debris and perform all cleanup work to the satisfaction of the Engineer within 3 working days after forms have been removed at any location.
Concrete removed shall be replaced within five (5) days after removal. All restorations shall be completed a maximum of five (5) days after concrete placement (i.e. backfill, grading of dirt, asphalt repave etc.) One Hundred ($100) dollars per calendar day and location shall be charged to the Contractor for failure to comply with the above schedule as required by the Engineer.
TP-4
SECTION 302 – ROADWAY SURFACING
302-5 ASPHALT CONCRETE (AC) PAVEMENT.
302-5.1 General. The Contractor shall establish designated asphalt truck routes and staging areas and shall communicate these routes and areas to truck drivers prior to the arrival at the job site.
This plan must be approved by the Engineer five (5) days prior to paving. 302-5.3 Prime Coat. Prime coat shall be applied to all subgrade surfaces prior to asphalt hot mix surfacing. The prime coat shall be Grade SC-250 liquid asphalt uniformity per Green Book requirements.
302-5.4 Tack Coat. Asphalt tack coat shall be applied to all existing asphalt surfaces prior to asphalt overlay.
Existing surfaces shall be cleaned utilizing a power sweeper and free of water prior to applying PG 64-10 or SS-1h asphalt tack coat per Green Book requirements. Tack coat shall uniformly cover all areas to be paved.
302-5.5 Distribution and Spreading.
BOTTOM DUMPING OF ASPHALT PAVING SHALL NOT BE ALLOWED.
302.5.6.2 Density and Smoothness. Failed areas shall be removed and replaced at Contractor's expense.
302-15 ASPHALT TRACKING PAVEMENT AND MITIGATION. The purpose of this section is to address any tracking related problems caused by the Contractor. The City requires that all streets adjacent to the project remain track free during and after construction. Contractor shall prevent and mitigate asphalt tracking on all adjacent surfaces. The use of water or any other methods approved by the Engineer may be utilized. If tracking is present at the end of the work day, the Contractor shall use steam cleaning and a vacuum truck to remove tracking from all affected areas to the satisfaction of the Engineer.
SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS,
AND PAVEMENT MARKERS
314-1 GENERAL. Furnishing and installation of traffic markings shall include all work required to place raised pavement markers, thermoplastic material and curb paint. Legends and crosswalks shall consist of thermoplastic material with glass bead finish.
Striping work and materials shall conform to the provisions of the Standard Specifications of the State of California, Department of Transportation, latest edition, and the Traffic Manual of the State of California, Department of Transportation. Installation of traffic markings shall be completed within 5 working days of paving.
314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKING. 314-4.1 GENERAL. Each fire hydrant in the project area shall be marked by placing a doublesided raised pavement marker with reflective blue markings on each side. The marker and adhesive shall be equivalent to Caltrans pavement markers.
TP-5
Place one marker 6 inches from street centerline toward hydrant on a line projected approximately perpendicular to curb. Place two markers if hydrant is on a corner, one on each street.
PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION
400-2 PERMANENT SURVEY MARKERS. The Contractor shall provide all surveying to complete the project and to replace any damaged monuments, benchmarks, ties, etc. All survey work shall be performed by a Land Surveyor registered by the State of California. Work shall be laid out and constructed so as to provide smooth profiles to adjacent improvements and drainage of all surfaces.
PRIOR TO START OF CONSTRUCTION, the Surveyor shall locate and provide ties for all existing centerline monuments and centerline ties. The Surveyor shall file a corner record of these monuments and ties with the County Surveyor. A copy of these corner records shall be given to the Engineer prior to start of construction.
AFTER CONSTRUCTION, all existing survey monuments and ties lost due to construction shall be reestablished by the Surveyor. THE SURVEYOR SHALL ALSO ESTABLISH CENTERLINE
MONUMENTS AND TIES AT ALL STREET AND ALLEY INTERSECTIONS WITHIN THE PROJECT LIMITS WHERE NONE EXISTED PRIOR TO CONSTRUCTION. A corner record of the monuments, benchmarks, ties, etc. established or reestablished shall be filed with the County Surveyor prior to the recordation of the Notice of Completion. A copy of the recorded corner records shall be given to the Engineer prior to final payment.
SECTION 401 - REMOVAL
401-3. CONCRETE AND MASONRY IMPROVEMENTS.
401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway, and Alley Intersections.
Concrete sidewalk construction shall include removal and disposal of existing interfering structures, tree roots, objects, soil, etc. Contractor shall remove and replace any inadequate existing base material with compacted CMB.
Any damaged utility boxes, traffic signal pull boxes, etc., shall be replaced. All boxes shall be adjusted to grade and all costs for this work shall be incidental and included in this item of work.
Concrete curb and gutter construction shall include removal and disposal of existing interfering structures, objects, soil, etc.
Curb & gutter to be replaced shall be installed at the same location as the existing on a straight grade across the limits of the replacement.
Removal, disposal and construction of adjacent 2-feet wide asphalt hot mix paving (C2 PG64- 10) over 6-inch thick C.A.B. shall be included.
The Contractor shall regrade the area at the back of curb/gutter where the new curb/gutter is constructed at a different grade than existing curb/gutter. The graded area shall have a TP-6
maximum slope of 3:1 and 2% in city parkways. Fill material, if required, for this grading shall be furnished by the Contractor. All landscaping and irrigation in the graded area shall be repaired Curb Ramp construction shall include removal and disposal of interfering structures, objects and soil. Ramp shall be 4" thick concrete over 6" thick C.A.B.
Included in this construction is the adjustment and protection of sweeps, conduits, pull boxes, utility access frames and covers to finished grade and protection of traffic detectors, stub-outs and homeruns. Traffic detectors damaged by the Contractor's operations shall be replaced at the Contractor's expense.
At locations where street lighting or traffic signal poles encroach into the curb ramp to be installed, concrete pedestals shall be constructed between finished grade and pole bases.
Removal, disposal and construction of adjacent curb & gutter, spandrel, cross gutter, and 24 in. wide hot mix asphalt paving (C2 PG64-10) over 6 in. thick C.A.B. shall be included. Ramp shall be poured separately from curb and gutter (min. 24hrs after curb and gutter).
The Contractor shall verify, with a “smart level”, that maximum ramp and sidewalk grades do not exceed maximum grades indicated on the project plans, when marking the required saw cut removal limits and when setting the concrete forms, prior to pouring any curb access ramp locations. It shall be the Contractor’s responsibility to supervise and utilize the proper experienced personnel to ensure that the proper saw cut limits are established for all access ramp locations and the Engineer shall not be responsible to direct the Contractor’s crews or otherwise serve in this management capacity.
The Contractor shall be responsible to layout the proposed access ramp to comply with the maximum grades indicated on the project plans. Typical construction tolerances to construct the new access ramp shall not apply and maximum grades indicated on the project plans shall not be exceeded. The Contractor shall be responsible to remove and reconstruct access ramps at his own cost if ramps are deemed non-compliant with the project plans and these Technical Provisions.
Where the type of access ramp includes a retaining curb at the back of access ramp to make up for a difference in elevation between the existing grade and access ramp grade, the construction of said retaining curb shall be considered as part of the access ramp work.
The access ramp construction work shall include all related adjustments of pull boxes, pull box covers, and protection of traffic signal poles and signs that fall within the proposed access ramp construction limits.
Special Note To Contractor:
Prior to constructing a curb ramp where physical site constraints do not allow the access ramp construction to fully meet the requirements/standard plans as indicated on the project plans, the Contractor shall so notify the Engineer for direction in advance of construction.
Curb ramp (modified) shall be per Dwg. ST-18, except concrete spandrel shall be sawcut 6" from curb face and minimum asphalt replacement will be required if any.
TP-7
Driveways, approach, alley intersection, spandrels and cross gutters construction shall include removal and disposal of interfering structures, objects and soil.
Removal, disposal and construction of adjacent 2-feet wide hot mix asphalt paving (C2 PG64- 10) over 6-inch thick C.A.B. shall be included.
Pavers or Brickwork. At the locations where pavers or brickwork exist, no additional compensation will be made for reinstallation. Should pavers or brickwork be damaged during removal, the replacement shall match existing.
The Contractor shall regrade the area at the back of sidewalk where the new sidewalk is constructed at a different grade than existing sidewalk. The graded area shall have a maximum slope of 3:1 and 2% in City parkways. Fill material, if required, for this grading shall be furnished by the Contractor. All landscaping and irrigation in the graded area shall be repaired .
All existing asphalt concrete ramping adjacent to the new sidewalk shall be removed and disposed of by the Contractor.
SECTION 402 – UTILITES
402-2 PROTECTION. The Contractor shall provide coordination with all utility companies involved and shall provide protection from damage to their facilities. The Contractor shall be responsible for repair or replacement to said facilities made necessary by its failure to provide required protection.
The Contractor shall be solely responsible to check all utility record maps, books, and/or other data in the possession of the CITY, other agencies, and/or all utility companies, and no allowance shall be made for any failure to have done so.
The Contractor shall utilize the services of “Underground Service Alert-Southern California” for utility locating in all public right-of-ways by calling 811 or 1-800-227-2600 at least 48 hours prior to any excavation.
Underground lines that are potentially hazardous such as oil company lines, natural gas mains, and electrical conduits will be carefully located by the owner as provided in the Standard Specifications. The Contractor shall take special precautions in determining the precise location and depth of these structures and coordinate work with the utility to ensure that they will not be damaged by its operations.
SECTION 403 – MANHOLE ADJUSTMENT AND RECONSRTUCTION
403-1 GENERAL. Adjustment of utility access openings shall include all work required to set access frames and covers flush with pavement. Adjustment of utility access openings shall be incidental to the associated item of work, and no additional payment will be made therefore.
SECTION 404 – COLD MILLING
404-1 GENERAL. Payment for cold milling pavement shall be according to the square feet of surface approved for milling irrespective of the actual area milled, the depth of milling, the TP-8
number of passes required, or the pavement material milled. There will be no compensation for over milling.
The City has investigated the street section and determined that pavement section has variable depths of asphalt and Portland cement concrete pavement, however, any presence of pavement fabric, petromat or irregular material shall be included in the bid item price for "cold milling" and no extra payment shall be made.
Areas of distorted pavement shall also be cold milled to a smooth uniform surface.
COLD MILLED AREAS SHALL NOT REMAIN UNPAVED OVER MORE THAN ONE WEEKEND.
NOTE: ON LOCAL RESIDENTIAL STREETS, COLD MILLED AREAS SHALL NOT REMAIN UNPAVED OVER MORE THAN ONE DAY; ALL COLD MILLED AREAS SHALL BE PAVED THE FOLLOWING DAY.
PART 5 – PIPELINE SYSTEM REHABILITATION
PART 6 - TEMPORARY TRAFFIC CONTROL
SECTION 600 - ACCESS
600-1 GENERAL.
600-1.1 Public Convenience and Safety Access. The Contractor shall provide temporary “No Parking” and all other signs which are necessary for the safe and orderly conduct of vehicular traffic as directed by the Engineer and as specified herein. Contractor shall also provide an approval barricaded area in the parking lane for pedestrian traffic during such time as the parkway is unfit to be used for pedestrian traffic.
At such times as driveways are inaccessible due to the Contractor’s work, they shall be blocked by two (2) Class II barricades or one (1) Class II barricade and two (2) delineators. Driveways that are ramped or planked for temporary access shall be provided with a barricade or delineator at each side. The Contractor shall give 24-hour notice to affected property owners prior to blocking any driveway.
The Contractor shall provide access for refuse collection on the regularly scheduled days. He shall also facilitate or assist in the collection where such work is hampered by his operations. 600-1.2 Street Closures, Detours, and Barricades. The Contractor shall not close any street within the City of Gardena without first obtaining the approval of the Engineer. Barricading, traffic control and detour diagrams in connection with street closures shall be submitted by the contractor as required by the Engineer.
The Contractor shall provide and install barricades, delineators, warning devices and construction signs in accordance with the California Manual of Temporary Traffic Controls or W.A.T.C.H. Handbook. During adverse weather or unusual traffic or working conditions additional traffic devices shall be placed as directed by the Engineer. All traffic signs and devices shall also conform to the California Manual of Temporary Traffic Controls or W.A.T.C.H.
Handbook.
TP-9
The Contractor shall provide and maintain Type II barricades along excavation edges parallel to the flow of traffic at a maximum spacing of twenty-five feet. Type II barricades mounted with flashers shall be installed around work areas in parkways. Type II barricades shall have alternating reflective orange and reflective white stripes at an angle of 45 degrees. The strip width shall be in accordance with Table 5-1 “Barricade Characteristics” “Manual of Traffic Controls for Construction and Maintenance Work Zones”.
During paving operations, barricades may be supplemented with minimum size eighteen-inch high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty feet. Traffic cones and delineators used within State rightof-way shall be a minimum size of twenty-eight inches high. At all access points such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five-foot intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a “Road Closed” sign shall be provided at the nearest prior intersection. “No Left Turn” signs shall be provided wherever required by the Engineer.
When one-way access from a side street or alley is permitted, barricades and cones shall be provided at five-foot intervals for a distance of fifty feet on either side of the centerline of the intersecting street, or alley.
Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices, the Agency will place such necessary items and the Contractor shall be liable to the Agency for providing such devices in accordance with the following provisions:
1. For placing of barricades: $5.00 per barricade for the first day or any part thereof and $2.00 per barricade, per day, for each day thereafter or any part thereof. For flashers: $2.50 per flasher for the first day or any part thereof and $1.00 per flasher, per day, for each day thereafter or any part thereof. For traffic cones:
$1.00 per cone for each day or any part thereof.
2. In the event that the services of the Agency are required between the hours of 5:00 P.M. and 8:00 A.M., during the normal week or at any time on Saturday, Sunday or a Agency holiday, there shall be an additional charge to the above set forth minimums of $188.00 for each service trip required.
Contractor shall relocate, preserve and maintain the visibility of all existing signs within the project limits which affect the flow of traffic, as directed by the Engineer. Any signs which are damaged or found to be missing during the course of construction shall be replaced by the Contractor at his expense as directed by the Engineer. All other signs that interfere with the course of work and are not necessary for the safe flow of traffic will be removed and replaced by the Agency. Traffic control signs include Stop Signs, Speed Limit, Parking Restrictions and other regulatory signs.
SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSRTUCTION AND
MAINTENANCE WORK ZONES
601-1 GENERAL. A minimum of two (2) lanes (one lane in each direction) shall be maintained at all times for a continuous flow of traffic, except as otherwise approved by the Engineer.
Lane closures shall be allowed between 8:00a.m. and 4:00p.m. only. No traveled lane shall be closed overnight without prior City approval. Access to private property shall be maintained at all times.
TP-10
"Temporary No Parking" signs shall be posted no more than 100 feet apart at least 72 hours prior to work. The signs shall be mounted on either 1” x 2” X 3’ high wood stakes, Type II barricades, or 39-inch high delineators. Signs shall not be posted on trees, traffic signal poles, utility poles, streetlights, or any other street furniture. Signs shall be professionally made of moisture-resistant, heavy duty cardboard or other approved material. "Temporary No Parking" signs shall be maintained by the contractor at all times and shall be approved by the Engineer prior to posting. Cover existing street signs as directed by the Engineer. "Temporary No Parking" signs shall be implemented for one week only (M-F) at a time. Signs shall be removed and reposted each week as needed and approved by the City.
DURING PAVING OPERATIONS, THE CONTRACTOR SHALL PROVIDE INDIVIDUALS AND EQUIPMENT DESIGNATED TO PERFORM AND MAINTAIN TRAFFIC CONTROL ONLY. The Contractor shall furnish, place and maintain all temporary traffic control devices required for the safe and orderly flow of vehicular and pedestrian traffic during construction. All Traffic control shall conform to the California Manual of Temporary Traffic Controls (California M.U.T.C.D.) or Work Area Traffic Control Handbook (W.A.T.C.H. Handbook).
If traffic control measures are not in conformance with these provisions, the project shall be stopped until conformance is attained to the satisfaction of the Engineer.
At locations where excavations are left open overnight, flashing barricades shall be placed along the excavation at a maximum spacing of 20 feet. A minimum of 3 flashing barricades shall be placed at any one excavation.
Temporary striping will be permitted only on base course and pavement to be overlaid.
Temporary pavement markings to be placed on new asphalt shall be spaced at 25 ft maximum and shall be removable without damage to the new overlay. Method of temporary markings shall be submitted to the Engineer for approval at the preconstruction meeting.
The Contractor shall submit and obtain written approval of traffic control plans from the Engineer five (5) working days prior to implementing.
Temporary lane closures shall be allowed during working hours specified in these Technical Provisions. Temporary lane closures maintained beyond the normal working hours may have a negative economic effect on the local residential, commercial/industrial business, and traveling public. Unless the Contractor secures prior written approval from the Engineer to maintain temporary lane closures beyond the working hours allowed, the Engineer may deduct a fee from a progress payment or bond for each temporary lane closure maintained beyond the allowed working hours. The fee will be accessed at a rate of Five Hundred ($500) per each travel lane per each thirty (30) minute interval, or fraction thereof as required by the Engineer. In no event will work be allowed past 5 p.m.
PART 7 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS
SECTION 700 – MATERIALS
700-5 TRAFFIC SIGNAL MATERIALS.
700-5.8 Detectors.
TP-11
700-5.8.2 Inductive Loop Detectors. Loop detector wire shall be Type 2 and loop detector lead-in cable shall be Type B per Section 86-1.02F of the State of California, Department of Transportation Standard Specifications, and latest edition.
SECTION 701 – CONSTRUCTION
701-13 GENERALWIRES, CONDUCTORS AND CABLES.
701-13.2 Splices. All conductor splicing shall conform to Section 87 of the Standard Specifications of the State of California, latest edition. All detector loop wire and lead-in cable shall be soldered at every splice or connection.
PART 8 – LANDSCAPING AND IRRIGATION
SECTION 801 – INSTALLATION
801-4 PLANTING.
801-4.5 Tree and Shrub Planting. Tree species shall be 24” box (species as noted).
Payment for this item shall include the following:
A. All material and work for planting of the tree.
B. One-year maintenance period. If a tree requires replacement within the on year maintenance period, the new tree shall also have a one year maintenance period from the date of acceptance.
Note: City will tag trees prior to installation. Total maximum distance to tag all trees shall be limited to 80 miles roundtrip and 3 locations. Otherwise, trees shall be brought to the City for approval prior to planting. Rejected trees shall be removed from the job site immediately. 801-4.5.1 Tree Removal. Remove and dispose of existing tree, stump and roots are supplemental provisions to Section 300-1.2 and 300-1.3 of the Standard Specifications. Grind roots minimum of 12" from top of grade. Backfill with select material and prepare for P.C.C. construction or tree replacement where shown.
Prior to removal of any tree, the following must be done:
1. Remove all concrete within 20’ of the tree marked for removal.
2. Schedule City Parks Division to inspect the tree and roots.
3. Get written approval from Parks Division to remove trees.
4. If Parks Division determines the tree can be saved, reduce tree removal and planting item by one.
801-6 MAINTENANCE AND PLANT ESTABLISHMENT. Maintenance period shall be one year and shall commence after work has been completed and approved by the City of Gardena Council.
All trees shall be guaranteed by the contractor for the maintenance period. Contractor liability shall cover cost of labor, equipment and materials to replace trees of similar size during the covered period.
END OF TECHNICAL PROVISIONS
Appendix A
City Standards & Drawing Details
JN 527 - PEDESTRIAN SAFETY
FY 2023 - 2024
LOCATION LIST SUMMARY
NO. ADDRESS LENGTH WIDTH S/W (S.F.) APCH (S.F.) CURB & GUTTER (L.F.)
REMOVE TREE
(EA.)
PLANT TREE
(EA.) TREE TO BE PLANTED COMMENTS
1 1736 130th St 20 10 200 200 Sidewalk and Curb 1+" difference COMMERCIAL 2 1705 130th St 10 10 100 Grind and transition
3 1715 130th St 27.6 8.8 242.88
4 1721 130th St 10.9 9.6 104.64 S/W C&G
5 1622 130th St 43.9 9.3 408.27 1 1 Possible tree removal 6 1600 130th St 7.5 9 67.5
7 1558 130th St 25.2 9.7 244.44 Panels cracked and lifted by trees 8 1556 130th St 15 9.8 147 Panels cracked and lifted by trees 9 1134 129th St 12.3 4 49.2 RR
10 1140 129th St 45.7 4 182.8
11 1150 129th St 44.2 4 176.8 104.39
12 1160 129th St 31.9 4 127.6
13 1163 129th St 17 4 68
14 1157 129th St 77.3 4 309.2 towards 1151 129th
15 1147 129th St 64.5 4 258 towards 1141 129th
16 1131 129th St 12.7 4 50.8
17 12817 Catalina Ave 7.8 4 31.2
18 13130 Catalina Ave 28.8 4 115.2
19 13124 Catalina Ave 8.9 4 35.6
20 13028 Catalina Ave 25.7 4 102.8
21 13018 Catalina Ave 8.9 4 35.6
22 12944 Catalina Ave 8 4 32
23 12912 Catalina Ave 15.9 4 63.6
24 12927 Berendo Ave 4 4 16
25 13025 Berendo Ave 10 4 40
26 13116 Berendo Ave 10.5 4 42
1 of 3 7/10/2024
JN 527 - PEDESTRIAN SAFETY
FY 2023 - 2024
LOCATION LIST SUMMARY
NO. ADDRESS LENGTH WIDTH S/W (S.F.) APCH (S.F.) CURB & GUTTER (L.F.)
REMOVE TREE
(EA.)
PLANT TREE
(EA.) TREE TO BE PLANTED COMMENTS
27 1017 W 130th St 29 4 116
28 12926 Berendo Ave 19.7 4 78.8
29 1010 130th St 5 4 20
30 1031 130th St 10 4 40
31 1023 131st St 17.3 4 69.2
32 1018 131st St 17.2 4 68.8
33 1012 131st St 0 0 0 97.09
34 1114 132nd St 40 4 160
35 1115 133rd St 11.4 4 45.6
36 1116 133rd st 13 4 52 SW Corner
37 13324 New Hampshire Ave 4 4 16
38 13336 New Hampshire Ave 20 4 80
39 13436 New Hampshire Ave 16.8 4 67.2
40 13331 Kansas Ave 32 4 128
41 13312 Berendo Ave 9.3 4 37.2
42 13324 Berendo Ave 12.5 4 50
43 13442 Catalina Ave 34 4 136
44 1031 132nd St 30 4 120 98
45 1030 132nd St 28 4 112 98
46 13101 Van Buren Ave 8 5 40
47 13631 Van Buren Ave 25 4 100 1 1 Desert Willow tree removal, replant Desert Willow 48 13603 Van Buren Ave 24 4 96 1 1 Desert Willow save old tree (prune), if unable, replant with desert willow 49 13610 Mariposa Ave 28 4 112
50 13603 Mariposa Ave 16 4 64
51 13606 Mariposa Ave 32 4 128 1 1 tree removal, (no replant pkwy too small) 52 13619 Catalina Ave 0 0 0 18
2 of 3 7/10/2024
JN 527 - PEDESTRIAN SAFETY
FY 2023 - 2024
LOCATION LIST SUMMARY
NO. ADDRESS LENGTH WIDTH S/W (S.F.) APCH (S.F.) CURB & GUTTER (L.F.)
REMOVE TREE
(EA.)
PLANT TREE
(EA.) TREE TO BE PLANTED COMMENTS
53 13800 Budlong Ave 12 4 48
54 13809 Berendo Ave 20 4 80 1 1 Austrailian Willow tree removal, replant with austrailian willow 55 13820 Berendo Ave 16 4 64 1 1 tree removal, no replant pkwy too small 56 13629 Berendo Ave 0 0 0 91
57 1321 140th St 8 4 32 198 16 top priority
58 1317 140th St 23 4 92
59 14115 Van Buren Ct 22 4 88 141st cross street
60 14114 Deanna Ct 16 4 64
61 14116 Raymond Ave 8 4 32
62 14112 Raymond Ave 92 4 368 60 Thru 14104 Raymond Ave, top priority 63 14108 Raymond Ave 0 0 0 8
64 14113 Raymond Ave 12 4 48
65 14109 Raymond Ave 12 4 48
3 of 3 7/10/2024
City of Gardena
Gardena City Council Meeting
AGENDA REPORT SUMMARY
Agenda Item No. 16.C
Section: DEPARTMENTAL
ITEMS - PUBLIC WORKS
Meeting Date: September 10,
2024
TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE: Authorization to Purchase 2024 Ford Crew Cab F350 Pickup Truck from Downtown Ford Sacramento in the amount of $69,616.49 and Sell Current 1999 Chevrolet Crew Cab 2500 Pickup Truck at Estimated Residual Value of $3,000 for the Public Works Department
COUNCIL ACTION REQUIRED:
Staff Recommendation: Approve Purchase and Sell Current Vehicle RECOMMENDATION AND STAFF SUMMARY:
Staff requests that the City Council approve the purchase of the 2024 Ford F350 pickup truck from Downtown Ford Sacramento. This truck will replace the 1999 Chevrolet Crew Cab 2500.
The estimated residual value to sell as is, is $3,000. The pickup truck is used on a daily basis for day-to-day operations by the Public Works Department for sewer maintenance operations.
The quote received was obtained from the State of California Contract 1-22-23-20F, CLIN 48 that other municipalities have used to negotiate the best prices. Gardena Ordinance No. 1780 and Gardena Purchasing Policy APP-2018-003, Section (B) permit contracts using the Cooperative and "Piggyback" Agreements.
Staff recommends that the City Council approve the purchase of the 2024 Ford F350 pickup truck from Downtown Ford Sacramento in the amount of $69,616.49 and sell the current 1999 Chevrolet Crew Cab 2500 for an estimated residual value of $3,000 (These funds will be credited to the Sewer Fund).
FINANCIAL IMPACT/COST:
Source of Funds: $69,616.49 Sewer Fund- Fiscal Year 2024-2025 ATTACHMENTS:
2024 Ford F350 Quote.pdf
APPROVED:
___________________________________
Clint Osorio, City Manager
City of Gardena
Gardena City Council Meeting
AGENDA REPORT SUMMARY
Agenda Item No. 16.D
Section: DEPARTMENTAL
ITEMS - PUBLIC WORKS
Meeting Date: September 10,
2024
TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE: Approve a Cooperative Agreement between the Los Angeles County Department of Public Works and the City of Gardena to share costs for the County Regional Traffic Signal Synchronization Program (TSSP) Project, JN 518, on East Rosecrans Ave.
COUNCIL ACTION REQUIRED:
Staff Recommendation: Authorize the City Manager to Execute the Agreement RECOMMENDATION AND STAFF SUMMARY:
In an effort to enhance traffic flow, City and LA County desire to modify and synchronize the traffic signals along Rosecrans Ave from Ocean Gate Ave. to Vermont Ave., including a segment within the City of Gardena. The proposed improvements are jurisdictionally shared between the City of Gardena, City of Hawthorne, City of Los Angeles, City of Lawndale, and LA County. The City of Gardena is participating at three intersections (Rosecrans Ave and Gramercy Pl., Rosecrans Ave. and Western Ave, Rosecrans Ave and Normandie Ave.) The proposed traffic signal synchronization project (TSSP) is being led by the Los Angeles County Department of Public Works. The project will include new or replacement of existing traffic signal poles, mast arms, traffic signal lights, controllers, pull boxes, foundations, loops, traffic signs etc.
The Cooperative Agreement with Los Angeles County Department of Public Works will serve as a mechanism to define the responsibilities and terms for reimbursement for actual share for cost of design, construction, contract administration, and inspection costs associated with the project. This agreement follows the same formant and incorporated the same language as past L.A. County executed cooperative agreements.
Staff respectfully recommends that City Council authorize the City Manager to execute the Cooperative Agreement, in a form approved by the City Attorney, between LA County Department of Public Works and the City of Gardena for the County Regional TSSP Project on Rosecrans Ave (East) TSSP Project, JN 518 in the amount of $332,500.00 and additionally approve 10% contingency.
FINANCIAL IMPACT/COST:
Funding Source : Measure M Local
Budgeted Amount : $400,000
Budgeted Fiscal Year: 2024-2025
ATTACHMENTS:
Rosecrans Ave. TSSP Co-op Funding Agreement.pdf
APPROVED:
___________________________________
Clint Osorio, City Manager
City of Gardena
Gardena City Council Meeting
AGENDA REPORT SUMMARY
Agenda Item No. 16.E
Section: DEPARTMENTAL
ITEMS - PUBLIC WORKS
Meeting Date: September 10,
2024
TO: THE HONORABLE MAYOR AND MEMBERS OF THE GARDENA CITY COUNCIL AGENDA TITLE: Approve On-Call Professional Services for General Civil Engineering Design, Construction Management and Inspection, Traffic Engineering, Architecture and Landscape Architecture, Geotechnical Engineering/Geology and Material Testing, and Staff Augmentation.
COUNCIL ACTION REQUIRED:
Staff Recommendations: Approve On-Call Professional Consultants for As-Needed Services
RECOMMENDATION AND STAFF SUMMARY:
The City of Gardena is experiencing an unprecedented level of activity in its Capital Improvement Program, with a record-high CIP budget of $71.5M and 44 projects. Additionally, the City has been averaging over 1,000 plan check reviews and encroachment permits in the public right-of-way annually for the past three years. The current on-call Professional Services Agreements, approved by the City Council in 2019 with various firms, are set to expire in September 2024.
Various on-call professional services are essential to support the City’s efforts in completing budgeted CIP projects, which include parks, facility remodels, feasibility studies, traffic analysis, specialized soil testing and inspections, and roadway infrastructure, including underground pipes. Utilizing consultants provides the departments with the flexibility needed to address the diverse requirements of these projects with minimal internal staffing, while also leveraging the consultants' specialized expertise.
Typically, procuring a specific consultant agreement from issuing the initial Request for Proposals (RFP) to obtaining Council approval and executing the contract can take several months. This process includes not only developing the RFP but also fulfilling all contract agreement requirements, including insurance, which also requires considerable time. To streamline this process, many local agencies have adopted the use of on-call consultants, which is also acceptable method by the Caltrans.
On-call contracts for professional services are an effective means to secure engineering, architecture, and other professional expertise, ensuring that CIP projects and studies are completed in a timely and cost-effective manner. The City can engage consultants individually for each specific scope of work or utilize the list as prequalified consultants and obtain proposals. Attached for review are the active insurance details and an on-call Professional Services Agreement (PSA). This agreement, along with the consultant’s fee schedule, will be executed for each selected firm. However, as these agreements are for on-call, as-needed services, there is no guarantee of work for any firm.
On May 9, 2024, the Public Works Department issued a Request for Qualifications (RFQ, See Attached), which was advertised on the City’s website and in IMS publication for public sector/government RFPs/RFQs. Fifty-seven Statements of Qualifications (SOQs) were received by June 13, 2024. The SOQs were reviewed and evaluated by the Director of Public Works and the Assistant Director of Public Works based on the following eight major criteria:
1. Presentation and Content (5%)
2. Project Manager’s Experience (5%)
3. Familiarity/Experience with the Local Region (5%)
4. Qualification of All Team Members (20%)
5. Team Resources and Availability (30%)
6. Relevant Project Experience (20%)
7. References (5%)
8. Fee Schedule (10%)
Each criterion was scored on a scale of 0-100 and ranked according to the highest average score. Unlike construction contracts, where the award goes to the lowest responsible bidder, professional service contracts are awarded to qualified firms based on their overall qualifications and reasonable fee structures.
Staff respectfully recommends that the City Council:
1) Approve the following top-rated firms to provide as-needed professional services in six categories for a duration of three years, with an option for staff to extend the contract for an additional two years if the consultants perform satisfactorily:
General Civil Engineering Design (10 out of total 18 firms selected) – Cannon Corporation; Onward Engineering; TAIT & Associates, Inc.; PSOMAS; NV5, Inc.: DMS Consultants, Inc.; Kreuzer Consulting Group., David Evans and Associates, Inc.; AZTEC Engineering Group, Inc.; and John M. Cruikshank Consultants, Inc.
Construction Management and Inspection (5 out of total 10 firms selected ) – Anser Advisory Management, LLC; PSOMAS; Onward Engineering; Cannon Corporation; and TRANSTECH Engineers, Inc.
Traffic Engineering (5 out of total 12 firms selected) – Hartzog & Crabill, Inc.; JMDiaz, Inc.; TJKM Transportation Consultants; David Evans and Associates, Inc.; Iteris, Inc.
Architecture and Landscape Architecture (5 out of total 9 firms selected) – Architerra Design Group; BGB Design Group; IDS Group; BREEN Design Group; VERDE DESIGN, Inc.
Geotechnical Engineering, Geology and Material Testing (3 out of total 5 firms selected) – Terracon Consultant, Inc.; NV5, Inc.; Ninyo & Moore, Inc.
Staff Augmentation (3 out of total 3 firms selected) – Project Partners, Inc., Kimley-Horn and Associates, Inc., and Transtech Engineers, Inc.
2) Authorize the City Manager to approve contract amounts up to $100,000 per each project in each category during the on-call contract term. Any services exceeding this amount will be agendized for Council review.
FINANCIAL IMPACT/COST:
The consultants will be used on an as-needed basis, and costs associated with CIP projects will be charged directly to those projects.
ATTACHMENTS:
Consultant Agreement_Anser Advisory Management.pdf
Consultant Agreement_Architerra Design Group.pdf
Consultant Agreement_AZTEC.pdf
Consultant Agreement_BGB Design Group.pdf
Consultant Agreement_BREEN Design Group.pdf
Consultant Agreement_Cannon Corporation.pdf
Consultant Agreement_David Evans and Associates.pdf
Consultant Agreement_DMS Consultants.pdf
Consultant Agreement_Hartzog and Crabill.pdf
Consultant Agreement_IDS Group.pdf
Consultant Agreement_Iteris.pdf
Consultant Agreement_JMDiaz.pdf
Consultant Agreement_John M. Cruikshank Consultants.pdf Consultant Agreement_Kimley-Horn and Associates.pdf
Consultant Agreement_Kreuzer Consulting Group.pdf
Consultant Agreement_Ninyo and Moore.pdf
Consultant Agreement_NV5.pdf
Consultant Agreement_Onward Engineering.pdf
Consultant Agreement_Project Partners.pdf
Consultant Agreement_PSOMAS.pdf
Consultant Agreement_TAIT and Associates.pdf
Consultant Agreement_Terracon Consultants.pdf
Consultant Agreement_TJKM Transportation Consultants.pdf Consultant Agreement_Transtech Engineers.pdf
Consultant Agreement_Verde Design.pdf
APPROVED:
___________________________________
Clint Osorio, City Manager
Consultant Agreement with Anser Advisory Management, LLC Page 1
CITY OF GARDENA
CONSULTANT AGREEMENT WITH
ANSER ADVISORY MANAGEMENT, LLC
This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena, a municipal corporation (“City”) and Anser Advisory Management, LLC, a CA Limited Liability Company (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.
1. RECITALS. This Agreement is made and entered into with respect to the following facts:
A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• Construction Management and Inspection
B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:
2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.
A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.
B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.
C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 2 progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.
3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.
4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.
5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RFQ, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.
6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.
7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.
8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 3 and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.
9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.
Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.
Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.
10.COMPENSATION. Consultant shall be compensated as follows:
A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.
B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.
Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.
C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.
11.INSURANCE REQUIREMENTS.
A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 4 comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.
B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.
C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:
1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.
2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.
3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.
4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.
If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 5
5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.
There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.
E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfinsured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 6 losses and related investigations, claim administration and defense expenses.
F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.
G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.
H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.
12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.
Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 7 recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.
13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.
14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.
Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.
15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.
Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 8
16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.
17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.
18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.
HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 9 publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.
Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.
19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.
20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.
21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.
22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.
23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 10 based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.
24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.
25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.
26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:
To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer
To Consultant: Anser Advisory Management, LLC
300 Spectrum Center Dr, 14th Floor
Irvine, CA 92618
Attn: Tyson Atwood
Senior Vice President
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.
27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.
28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.
29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 11 that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.
30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:
A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.
D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.
31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.
32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.
33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.
34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.
35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 12 attorney’s fees and court costs from the opposing party.
36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.
37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.
39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with Anser Advisory Management, LLC Page 13 IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.
CITY OF GARDENA CONSULTANT – Anser Advisory
Management, LLC
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:
Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:
Sign:_____________________________
Title:
Carmen Vasquez, City Attorney
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Senior Vice President
Tyson Atwood
Secretary
Craig Halvorson
Exhibit A
Request for Qualifications (RFQ)
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E
CITY OF GARDENA
PUBLIC WORKS DEPARTMENT
REQUEST FOR QUALIFICATIONS (RFQ)
FOR
GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION
MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,
ARCHITECTURE AND LANDSCAPE ARCHITECTURE,
GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL
TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:
MAY 2024
Memoranda:
Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.
City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E
TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A” Gardena Standard Professional Services Agreement…………….……………… 10 Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 1 | Page
SECTION I
NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services NOTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on-call services related to our Public Works Capital Improvement Program and General Engineering. The work will be assigned on an as-needed basis for various projects in the City.
The Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.
The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/ Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217-9643 or [email protected].
BACKGROUND
The City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council-Manager form of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built-out, with a few remaining undeveloped parcels and a 9.4-acre wetland preserve, Gardena Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.
The Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.
The existing city-owned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City discharge to the LACSD interceptor at over 100 locations.
The existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).
The collection system pipes within the City primarily discharge to the Dominguez Channel.
Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.
The City has six (6) parks with community buildings, two gymnasiums, and a parkette. Additionally, the Gardena Wetland Preserve is situated next to Johnson Park. The City is currently constructing a new pool and senior center community center. Furthermore, the newly acquired Chase Bank Building on Rosecrans Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 2 | Page
Boulevard is slated to become a new Community Center, and Mas Fukai Park is in the construction document phase for improvements.
SUBMITTAL DEADLINE
Complete proposal/Statement of Qualification must be submitted no later than Thursday, June 13, 2024, at 2:00 p.m. PST. Three (3) hard copies and one complete PDF copy (on CD or memory stick) shall be address to:
City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, Assistant Public Works Director
The City currently anticipates conducting the selection process according to the following schedule, which is subject to revision. The City reserves the right to modify the schedule as needed.
May 9, 2024 RFQ Released
June 3, 2024 RFI Deadline
June 13, 2024 Proposal/SOQ Deadline
July 9, 2024 Staff Short List Selection
July 23, 2024 City Council Review/Approval
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 3 | Page
SECTION II
SCOPE OF SERVICES/SCOPE OF WORK
The City of Gardena would like the selected firms to provide professional on-call engineering, architecture, and/or landscape architecture services (including Construction Documents, PS&E, technical memoranda, research studies, plan checks, testing, etc.) for City projects to support the Public Works Department. The City intends to select between three and five (3-5) consultants for each respective service category, with the exception of only one or two consultants for Geotechnical Engineering/Geology/Material testing.
However, the actual number of consultants selected may be subject to change based on the number of responses and qualifications.
The award agreements are to provide on-call services for a period of three (3) years. The agreements may be renewed at the City’s discretion for up to two (2) additional years, subject to satisfactory performance during the initial three-year term. The initial three-year term is anticipated to commence in September 2024 and end in September 2027. The City encourages firms to submit qualifications for any or all parts of the key services listed below to be eligible for placement on the qualified on-call/as-needed list for each service category separately.
At the City’s discretion, selected firms will be assigned projects based on their qualifications in relation to the project(s) scope of work, or requested to submit a proposal, on an as-needed basis for various projects in the city. The City does not guarantee that successful firms will be provided with any projects.
MINIMUM QUALIFICATIONS
Only those consultants with verifiable experience related to the services requested in this solicitation will be considered during the evaluation process. Consultant staff assigned to execute the scope of services must have relevant experience in providing the necessary services as described in the scope. All personnel assigned to the work must possess appropriate certification or registration as required by state and local agencies.
SCOPE OF WORK
Selected firms will report to and operate under the direction of the City of Gardena Public Works staff to provide professional engineering, architecture, and/or landscape architecture services to the City. In general, the selected consultants will be expected to provide services and staffing for the following categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
Consultants may submit qualifications for one or more of the service categories requested; however, separate proposals and letter of transmittals must be submitted for each category.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 4 | Page
GENERAL CIVIL ENGINEERING DESIGN
Provide complete design services for Capital Improvement Program projects. Example services include, but not limited to:
• Plan preparation for street improvements, repair, rehabilitation, or other related street improvements.
• Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
• Preparation of hydrology and hydraulic analysis and reports. • Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. • Geotechnic engineering and material testing as needed. • Preparation of project technical provisions.
• Preparation of detailed cost estimates.
• Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. • Provide design and construction surveys.
• Provide construction assistance.
• Coordination with, and approvals from other permitting agencies and utility companies.
CONSTRUCTION MANAGEMENT AND INSPECTION
Provide complete construction management and inspection services for CIP, including park renovations, and facility construction/ modifications/ modernizations. Including, but not limited to:
• Coordinate and lead project construction meetings.
• Lead all meetings during the construction from pre-construction to final closeout. • Provide and maintain project files/documents per City template. • Provide and supervise construction observations/inspections for CIP projects such as streets, sewer, storm drain, parks and facilities.
• Provide construction inspection services in grading, street improvements, drainage, SWPPP/erosion control, paving, sewer, water, and franchise utilities. • Provide public contract administration (i.e. CCO, Daily logs/report, Weekley Statements, Notices, labor compliance/enforcement).
• Provide utility company coordination.
• Provide labor compliance/enforcement as needed.
• Assure contractor to maintain a set of as-built plans. • Schedule the final walk-through inspections and prepare a “punch-list”. • Collect and review the Certified Payrolls as needed.
• Assume contractor to obtain all necessary permits.
• Provide constructability review, quantity take-off and cost estimates as needed.
TRAFFIC ENGINEERING
Provide traffic design engineering and/or study/analysis services for signal and signing, striping, grant writing, and all related services, including but not limited to:
• Improvements associated with traffic signal design.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 5 | Page
• Preparation of signing, striping, signal modifications, detour, and traffic control design • Preparation of special traffic studies
• Conducting signal synchronization studies (before and after synchronization travel time), utilizing HCM method for LOS, as well as Los Angeles County standards.
ARCHITECTURE AND/OR LANDSCAPE ARCHITECTURE
Provide architecture and/or landscape architecture professionally services for public facilities. Including, but not limited to:
• Provide conceptual design, master plan, feasibilities study and envelope evaluations. • Renovation and/or expansion of existing public facilities. • Preparation of landscape/planting plans and irrigation. • Parking lot and hardscapes improvements.
• Playground layout and play structure design/upgrade.
• Preparation of project special provisions and technical specifications • Provide cost estimates.
• Provide constructability review and construction support.
GEOTECHNICAL ENGINEERING, GEOLOGY AND MATERIAL TESTING
Provide complete design, construction, or assistance services for City improvement projects and/or investigations. Services include, but are not limited to:
• Complete soils investigation and preparation of Geotechnical Engineering reports and studies, such as pavement design, grading requirements, retaining wall parameters, slope stability analysis, sinkhole/voids investigation and analysis, etc. • Laboratory work related to all aspects of Geotechnical Engineering. • Provide construction inspection for items such as asphalt concrete, aggregate base, and concrete placement during construction, grading excavation, and backfill. • Provide testing services such as field compaction and laboratory testing of soils, aggregates, asphalt, and concrete.
STAFF AUGMENTATION SERVICES (Firms may submit only for positions or service they provide.) Provide qualified and available personnel to provide professional staff augmentation services and/or backfill various positions and classifications within the Engineering Division on short notice. Positions include but are not limited to: Engineer(s), Permit Technician(s), and Inspector(s) and perform duties as an “Acting” City representative. Positions may require personnel reporting to City offices.
Immediately the City plans to augment one (1) Associate, Civil, or Senior Civil Engineer based on the qualification and best fit for the City. Other categories of augmentation services are not currently needed, however will be requested as needed.
Sample duties include, but not limited to:
• Engineer(s) general requirements (Identify an Engineer with resume and proposed classification; Associate, Civil, or Senior Civil Engineer) - Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 6 | Page
o Able to work minimum 20 hours per week or more. The City is open to accepting fulltime services as well. o Perform mathematical computations and estimates.
o Simultaneously handle several tasks and continue to reestablish priorities. o Communicate clearly and concisely with others, orally and in writing. o Ability to establish and maintain effective team relationships with all internal and external customers.
o Able to operate Microsoft Office and AutoCAD.
o Able to perform in indoor and outdoor environments with exposure to the elements. o May be required to pass a security/background check and a drug test prior before providing any services to the City.
o Must maintain a valid California Drive License.
o You may be required to work more than 40 hours a week and/or work irregular hours, particularly during emergency situations.
o Typical working hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. or 9/80 schedule from 7:30 a.m. to 5:30 p.m.
o Civil and Senior Engineer positions require a California Professional Civil Engineering license.
o May be required to arrange for the City to interview a candidate, at the Consultant’s expense, for a period of up to one (1) hour.
Typical Responsibilities – The staff will be under general direction of Engineering Division Manager, performing and overseeing various CIP projects from preliminary design to final construction. Examples of duties and responsibilities are as follow:
o Prepares RFP/RFQ for design and Construction Management and Inspection (CMI) services.
o Prepares and/or oversees design Plans, Specifications, & Estimates (PS&E). o Prepares and leads project bid processing, writes council agenda report, and executes contract.
o Oversees CMI services.
o Prepares Caltrans required submittals and coordinates review process (i.e. PES, E76 o and Contract award packages).
o Performs minor drafting, computing, and checking field operations as related to the layout and construction of pavement, curbs, gutters, sidewalk, traffic, utilities and other CIP.
o Performs LA Metro required project reporting, reimbursement process, etc. o Interprets and applies GREENBOOK, Caltrans Standards, City Standards, and other laws and regulations relating to CIP projects.
• Provide Permit Technicians to assist public at Engineering public counter (Not required to identify personnel at this time).
• Provide Construction Inspection services (Not required to identify personnel at this time), such as:
o CIP projects such as street rehabilitation; sewer or storm drain improvements, facility modifications and improvements; park rehabilitation and improvements. o Private development including paving, utilities, sewer, storm drains, paving, etc. o Repairs and improvements by private utility companies.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 7 | Page
SECTION III
SUBMITTAL REQUIREMENTS
The Proposal package shall be organized and presented in a neat and logical format relevant to the services requested. Submittals shall be clear, accurate, concise, and comprehensive. There is no page limitation, however, excessive, or irrelevant material will not be favorably received.
The Proposal should be in the order below and include the following:
• Cover
• Cover Letter
o Clearly indicate the on-call service category.
o Express why Consultant is interested in the RFQ.
o Include contact information for the person responsible for the Proposal and who will be the point of contract for the City.
o Include any unique attributes or distinguishing characteristics which would be of value to the City.
o State if any addendums have been received and include in the Proposal. o Statement regarding acceptance of Agreement and insurance requirements. o Letter shall be signed by an officer of the firm who is authorized to bind the firm to the contract. Include a statement to this effect.
• Firm Qualifications and Experience
o Describe firm’s background and experience.
o Describe your firm’s strengths.
o State how your firm produces deliverables free of errors and how you will address erros if they occur.
o Include experience and technical competence of subconsultants. o Familiarity of regional grants/competitive funds (SBCCOG & LA Metro) • Key Personnel and Experience
o Experience and history performing directly for local agencies within the last five years. o Include subconsultants if any.
• Organization Chart
• Similar Projects/Services
o Brief description of the project scope, personnel involved and their roles, plus agency and contact information of agency Project Manager/Engineer. o Projects that the firm was the prime consultant and responsible for management of any subconsultants.
• References
o Current contact information related to projects completed within the last five years. • Fee Schedule
• Resumes
Note: All licensed professionals in 'responsible charge' working on City projects (Engineers, Architects, Landscape Architects, and/or Surveyors) are required to disclose all disciplinary actions against them, including any future actions. Please provide a copy of any disciplinary actions with the proposal submission. Additionally, provide a statement if there are no disciplinary actions.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 8 | Page
SECTION IV
FEE SCHEDULE
A fee schedule should be included in the Proposal. This schedule should comprise a comprehensive list of positions and labor rates for all services provided by the prime consultant and all subconsultants. Rates should cover all necessary resources, including labor, equipment, materials, incidental reports, transportation, etc. Any percentage markup of subconsultant invoices shall be specified.
The fee schedule should remain fixed throughout the initial term of the Agreement unless formally amended by the City Council. Adjustment of the fee schedule can be negotiated if the City renews the Agreement.
The City is subject to prevailing wage laws, which apply to professional service providers and their subconsultants for whom the Department of Industrial Relations has established a wage determination.
This includes, but is not limited to, Field Soils Materials Testers, Operating Engineers, Surveyors, and Building/Construction and Specialty Inspectors.
Prevailing wage requirements apply when a Consultant and/or Consultant Team is awarded a contract for a specific project, which is designated by the issuance of a City Purchase Order.
SECTION V
SELECTION/EVALUATION CRITERIA
The Proposals will be evaluated by City of Gardena Public Works Department staff. The evaluation criteria will include:
• Presentation, completeness, clarity, organization, and conformance to the RFQ content. • Project Manager’s experience related to the City’s requirements and needs. • Familiarity/Experience related to the South Bay Cities Council of Governments (SBCCOG), Los Angeles County Metropolitan Transportation Authority (Metro), and Caltrans project programs, funding opportunities, grant writing, and their requirements. • Qualifications and resumes of staff members, subconsultants, and organization chart. • Similarity of the firm’s referenced projects completed within the last five years to the City’s expected projects.
• Availability and depth of staff and resources to deliver quality products on schedule, including work on short notice and under time constraints.
• References.
• Fee schedule.
During the evaluation period, the City may conduct negotiations with the most qualified consultants.
However, consultants should note that an award may be made without negotiations or discussions.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 9 | Page
SECTION VI
GENERAL CONDITIONS
By submitting a Proposal, the Consultant represents that they have thoroughly examined and become familiar with the requirements of this RFQ and are capable of performing quality work to achieve the objectives of the City.
The City reserves the right to withdraw the RFQ at any time without prior notice. The City makes no representations that any Agreement will be awarded to any Consultant responding to this RFQ. The City reserves the right to extend the deadline for Proposals, postpone reviewing the Proposals for its own convenience, reject any and all Proposals without indicating any reasons for such rejections, and negotiate with any qualified consultant. The City does not guarantee that successful firms will be provided with any projects.
The successful consultant(s) and sub-consultants are required to obtain and maintain a City of Gardena business license and insurance. The license and insurance shall be maintained for the duration of the Agreement. A current business license is not a prerequisite for submittal of the qualifications.
The City is not liable for any costs incurred by the Proposers before entering into a formal agreement.
Costs for developing the Proposal or any other such expenses incurred by the Proposer in responding to this RFQ and entirely the responsibility of the Proposer and shall not be reimbursed by the City.
The City is not responsible for Proposals which are delinquent, lost, incorrectly marked, sent to the wrong address, or sent by mail or courier service and not signed for by the City.
SECTION VII
AGREEMENT AND INSURANCE
The City’s standard Professional Services Agreement is included in Appendix A. The Consultant will be expected to enter into the Agreement without substantive changes. Any changes will require approval by the City Attorney. If there are any exceptions or if there are no exceptions, a statement to the effect shall be included in the proposal as well.
The City’s standard insurance requirements are included as part of the standard Professional Services Agreement included in Appendix A. The consultant shall procure and maintain throughout the duration of this Agreement.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 10 | Page
SECTION VIII
APPENDIX “A”
Gardena Standard Professional Services Agreement
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 1
CITY OF GARDENA
CONSULTANT AGREEMENT WITH XYZ
This Agreement is entered into this day of , 2024,
by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.
1. RECITALS. This Agreement is made and entered into with respect to the following facts:
A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:
2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.
A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.
B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.
C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.
3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.
4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.
5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).
6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.
7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 3
8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.
9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.
Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.
Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.
10.COMPENSATION. Consultant shall be compensated as follows:
A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee proposal hereto and incorporated herein by reference. In no event shall compensation under this Agreement exceed _____________and 00/00 ($###.##) without the prior written authorization of the City Council.
B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.
Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.
C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.
11.INSURANCE REQUIREMENTS.
A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 4
extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.
B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.
C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:
1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.
2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.
3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.
4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.
If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 5
shall be issued by an insurance company which is admitted to do business in the State of California.
5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.
There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.
E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfDocusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.
F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.
G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.
H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.
12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.
Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 7
the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.
13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.
14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.
Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.
15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.
Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 8
paid by City for employer contribution and/or employee contributions for PERS benefits.
16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.
17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.
18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.
HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 9
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.
Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.
19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.
20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.
21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.
22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 10
Agreement.
23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.
24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.
25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.
26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:
To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works
To Consultant: XYZ
Address
XXXX, CA #####
Attn: Name
Tittle
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.
27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.
28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 11
own risk, until written instructions are received from City.
29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.
30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:
A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.
D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.
31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.
32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.
33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.
34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 12
35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover attorney’s fees and court costs from the opposing party.
36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.
37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.
39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Consultant Agreement with XYZ Page 13
other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.
IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.
CITY OF GARDENA CONSULTANT – XYZ
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:
Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:
Sign:_____________________________
Title:
Carmen Vasquez, City Attorney
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 2024 City of Gardena RFQ On-Call Professional Services
JUNE 4, 2024
RFQ FOR ON-CALL PROFESSIONAL SERVICES
ADDENDUM 01
TO: ALL RFQ HOLDERS
ADDENDUM NO. 1, AS DESCRIBED BELOW, IS FOR THE USE OF CONSULTANTS SUBMITTING THE STATEMENT OF QUALIFICATIONS OR RESPONSES TO THE CITY’S REQUEST FOR QUALIFICATIONS. ALL
CONSULTANTS SHALL INDICATE ON THE STATEMENT/PROPOSAL COVER LETTER THAT THEY HAVE RECEIVED THIS ADDENDUM NO. 1.
QUESTIONS & RESPONSES:
1. In regard to the subject RFQ Scope of Work for General Civil Engineering Design as shown on page 4, can you please confirm if the City would like us to include Geotechnical services as part of the Civil component as stated, since there is also a separate RFQ category for Geotechnical service on page 5? No, please submit a separate statement of qualifications if your firm is interested in providing services in the category of Geotechnical Engineering, Geology, and Material Testing. This category is intended for direct geotechnical services for the City. For General Civil Engineering Design, it is expected that the lead consultant will team up with your desired geotechnical consultant or your own qualified staff as needed to provide complete PS&E construction documents.
2. Can firms be both a prime consultant and a sub-consultant to another team in the same or different service category?
Yes, firms can be both.
3. Will the City allow the usage of the City’s logo in the proposal materials? Yes, the City will allow the usage of the logo.
4. Can you specify how “Associate, Civil, and Senior Civil” Engineers are classified? Is it based on number of years of experience or other criteria?
You may reference the City of Gardena’s job specifications as your minimum guideline:
https://www.governmentjobs.com/careers/cityofgardena/classspecs. The specifications for the Senior Civil Engineer position have not been developed. Therefore, assume that the job responsibilities are similar to those of a Civil Engineer, but require a minimum of 8 years of experience, including managerial experience. As mentioned, these specifications are minimal guidelines and consultants are encouraged to propose additional qualifications or experience to provide a competitive proposal.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 2024 City of Gardena RFQ On-Call Professional Services
5. Can you please confirm if firms are able to just submit a proposal for the geotechnical engineering/geology and material testing services or require having a team with a construction management company in order to pursue this?
Yes, you may just submit a proposal/statement for the geotechnical/geology and material services.
6. Do you anticipate consultants to support and prepare grant applications? The City may request services under General Civil Engineering, Traffic Engineering, Architecture and/or Landscape Architecture as applicable.
7. You are requesting references in the Similar Projects/Services and the References sections. Can you please clarify what information you would like in each section since both sections are asking for client contact information?
The information can overlap; however, Similar Projects/Services should identify specific projects with scope descriptions, key personnel and their roles, project dates, etc., as mentioned in the RFQ. The Reference Section should identify the current contact agency, person, phone number, and email so the reviewer can perform the reference check if necessary.
END OF ADDENDUM 01
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Exhibit B
Statement of Qualifications (SOQ)
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E
REQUEST FOR QUALIFICATIONS (RFQ)
CITY OF GARDENA
GENERAL ON‐CALL PROFESSIONAL SERVICES:
CONSTRUCTION MANAGEMENT AND INSPECTION
JUNE 13, 2024
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E June 13, 2024
Kevin Kwak, Assistant Public Works Director
City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247‐3778
RE: REQUEST FOR QUALIFICATIONS FOR GENERAL ON‐CALL PROFESSIONAL SERVICES: CONSTRUCTION MANAGEMENT
AND INSPECTION
Dear Mr. Kwak,
We at Anser Advisory Management, LLC, dba Anser Advisory (Anser), part of Accenture, are pleased to respond to the City of Gardena’s Request for Qualifications for the Construction Management and Inspection Services category. Having serviced the City of Gardena through our legacy firm, Wallace & Associates, our team fully understands and appreciates the unique characteristics of the Gardena community. We appreciate and support the City’s mission to maintain and continually improve the safety and aesthetics of City streets, facilities, parks, medians, and City equipment at the highest level possible and the lowest possible cost.
We also recognize that the City’s goal is to provide for the continual maintenance and improvement of its physical infrastructure and facilities and quality engineering services.
With many of our staff and team members residing within the South Bay, we are highly invested in the ongoing success of the Gardena community. Our proposed team of experts has been brought together to best meet the City’s diverse needs in response to the anticipated projects. Our team specializes in offering tailored services that support public works projects, from the initial design phase to project closure, handling every task and deliverable along the way. Having provided on-call services to many similar municipalities and public agencies throughout southern California over our 28-plus-year history, we pride ourselves on delivering readily available resources in the form of trained and certified personnel, a full range of comprehensive support services, specialized expertise, and meticulous financial compliance resources. Our team’s combined experience, coupled with a deep understanding of best practices in coordinating diverse, complex, simultaneously occurring projects, translates into significant benefits to the City during the execution of your projects.
Given our history with the City of Gardena under Wallace & Associates, providing construction management and inspection services for the City’s Vermont Avenue Traffic Signal Upgrade, 170th Street Improvement Project, Fire Station 158 Roof Replacement, and Gardena Transit Facility Remodel, we are highly knowledgeable about the City’s procedures, preferences, and stakeholders. In addition to our history with the City, we have worked with Golden State Water Company (GSWC) on a Small Meter Replacement Project. Our proposed construction management and inspection team looks forward to continuing to contribute in productive and meaningful ways to your important work ahead. We leverage years of individual project and on-call experience servicing numerous southern California municipalities and public clients, including the City of Gardena. We value this opportunity to continue collaborating and supporting the City in executing your Capital Improvement Program.
As Senior Vice President of Anser Advisory Management, LLC, I certify that the information in the proposal is truthful, accurate, and complete at the time of submittal. Additionally, I have the authority to negotiate any agreements with the City of Gardena and bind Anser to the terms of the RFQ. Anser accepts the City’s standard Professional Services Agreement and insurance requirements included within the Agreement provided in Appendix A of the RFQ. We acknowledge receipt of Addendum 01 dated June 4, 2024. We thank you for your time and consideration of our submission and look forward to further engaging with the City on this important endeavor.
Sincerely,
Tyson Atwood, PE, QSD
Senior Vice President
1003 E. 4th Place, 8th Floor
Los Angeles, CA 90013
[email protected]
805.459.768797
1. Cover Letter Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E
TABLE OF CONTENTS
Table of Contents 1. Cover Letter 2
2. Firm Qualifications and Experience 4
3. Key Personnel and Experience 6
4. Organization Chart 10
5. Similar Projects 11
6. References 16
7. Fee Schedule 16
8. Resumes 17
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 1 City of Gardena On-Call
CM and Inspection
GARDENA
2. Firm Qualifications and Experience
Who We Are
Anser Advisory is a national construction management and program advisory firm that offers solutions to our clients’ capital program challenges. Anser supports clients in several public works infrastructure markets, including municipal, aviation, ports, transportation, education, and energy. Our service begins with the early phase of strategic organizational and program planning and continues through managing the tactical execution of each project or initiative. We operate locally from Los Angeles, Irvine, Palm Desert, and San Diego. We have a diverse and talented staff of professionals nationwide, including management consultants, estimators, schedulers, financial analysts, procurement specialists, system configuration specialists, architects, engineers, construction managers, certified professional accountants, and construction auditors.
Anser Advisory announced in August 2023 that it would sign an agreement to join Accenture, one of the world’s leading consulting firms. We are extremely excited about the opportunities combining Anser’s capital project/program/construction management expertise with Accenture’s broad-based professional services expertise will provide our clients moving forward. There are no anticipated organizational or staffing impacts that would result from the closing of this transaction, and it will not affect our daily operations or the City.
Managing the City’s On-Call Contract
The Anser team is ready whenever and wherever you need us. With our extensive experience managing resources for various agency on-call contracts, we recognize that services of this nature may range from full-time to intermittent support. Additionally, we understand that the nature of the request may be on short notice. The Anser team has a deep bench of qualified professionals that are ready to provide the City with resources for any project, no matter the size, and within a moment’s notice. Anser is prepared to deliver highly trained and energetic engineers and inspectors to complete the City projects on time, within budget, and of the highest quality.
When Anser is called on by the City to assemble a project team, we will present both our approach to successfully complete the project along with the resumes of multiple staff capable of executing the project. We will present only resumes of qualified candidates for the specific needs of the project. When assembling a team, our Contract Manager, Tyson Atwood, and Lead Project Manager, Adam Hunt, will internally meet with multiple candidates to vet and select the most qualified for the proposed project.
What Sets Us Apart • We’re detail-oriented: From the moment Anser is brought on board with any project, we are extremely thorough in reviewing all project documentation. Contract documents, constructability reviews, project correspondence, meeting minutes, responses to submittals and RFIs, or any other correspondence will be precise and clear to all stakeholders while providing direction or guidance.
• We’re cutting edge: Anser has been a leader in promoting new tools and programs to help make projects easier for Anser to manage, and our clients to access information. Programs like Virtual Project Office (VPO) and Bluebeam make tracking and documenting project correspondence, submittals, RFIs, change orders, as-builts, etc., easier. • We’re focused: We provide only advisory, compliance, and management services (we are not designers of record or atrisk construction managers). This focused approach allows us to invest in fully developing industry-leading services, invest in our staff, and manage and deliver projects without creating the potential for conflicts or competing interests. • We’re innovative: Although we have deep experience and mature project delivery methods, we continually work to design processes and solutions tailored to our clients’ unique challenges.
• We engage for impact: We understand that people build projects, and our work impacts our people and communities.
As such, we are an engaged organization focused on
positively impacting our communities’ economic, social, and environmental aspects. In the event that one of our neighbors has concerns over a current project, Anser staff is the first to contact the neighbor to investigate and ease the resident’s worries.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 2
CM and Inspection
GARDENA
ANSER ENGAGES
On the recent Center Greens Park Improvements Project in the City of Anaheim, Senior Construction Manager Adam Hunt was notified by a colleague that one of the residents in Anaheim was affected by adjacent sports lighting shining into his window during the day.
Adam immediately contacted the neighbor and set up a meeting that afternoon to resolve the neighbor’s concerns. That night, the lighting from the sports area was adjusted to prevent light from shining into the neighbor’s house. Within 24 hours of being notified about the concern, Anser contacted and resolved the issue alongside the community member to ensure he was not negatively affected by recent community improvements.
What We Deliver
Ensuring the successful completion of a project is the paramount goal of the Anser construction management approach, as it represents the realization of the City’s expected goals and objectives. Our construction managers employ proven project management tools to accomplish project tasks and achieve these goals.
Upon selection, award of a contract, and issuance of an NTP, our assigned project manager may refine project planning, enhancing the scope of services. This may include the development of a comprehensive work breakdown structure (WBS) that establishes (1) responsibility for work assignments, (2) planning and budgets, (3) performance measurements, and (4) communication.
As a management tool enabling effective project tracking, a defined work structure accomplishes the following:
• Organizes all the work described in the scope of work and facilitates proper planning of the approach. • Assigning specific responsibilities reflects the work to be accomplished and how it will be managed and performed. • Allows project management flexibility to meet the specific objectives of each base item deliverable. • Facilitates planning, budgeting, and scheduling.
• Sets attainable performance measurements.
• Facilitates timely communication and information reporting.
Our construction management team has developed and implemented efficient construction management information systems (CMIS) for contract administration and control of our past and current projects.
FREQUENCY ITEM
Daily Correspondence and Documentation, Correspondence Backup and Retrieval, Submittals, RFIs, RFPs, Time and Material Work, Daily Inspection Reports and CM Diary, As-Built Drawings, Photo and Video
Weekly Three-Week Look-Ahead Schedule, Weekly Statement of Working Days, PLA and Labor Compliance Reports
Monthly Master Project Schedule, Master Project Budget, Progress Payments, Change Order Processing, As-Built Drawings
As-Needed Survey and Inspection Requests
Per Occurrence Contractor, Vendor, Visitor
Quality Assurance/Quality Control
Anser will administer a program of QA/QC procedures for producing quality work and shall effectively manage and control the outcome. Specific procedures shall include, but shall not be limited to, coordination, cost control, checking, reviewing, and scheduling the work. Anser will provide a quality check of all construction calculations, change order drawings, survey notes, specifications, construction cost opinions, and reports.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 3 City of Gardena On-Call
CM and Inspection
GARDENA
3. Key Personnel and Experience
TYSON ATWOOD, PE, QSD
PRINCIPAL-IN-CHARGE
For over 20 years, Tyson has worked in the construction industry, managing increasingly complex projects and managing multiple projects over $100 million in construction value. He has a diverse background managing projects in the municipal, transportation, aviation, energy, and water/ wastewater industries. Tyson’s focus has been working with federal funds, and he is an expert in administering projects utilizing the Caltrans Local Assistance Procedures Manual (LAPM). He is highly experienced with the Caltrans Standard Specifications and “Greenbook.” Tyson is forwardthinking and has also worked on several innovative projects that have advanced technology and automated workflows to increase team efficiencies. Tyson’s communication skills as a Project Manager allow complete transparency between the project teams and the agency’s project manager, so the team knows all project and personnel issues and solutions. Tyson sets high expectations for his teams to put the agency and the public first in all decision-making for the greater good of the project.
Education
- BS, Civil Engineering
Licenses/Certifications
- CA Professional Engineer
#71514
- SWPPP #01243
- AQMD Coachella Valley
Fugitive Dust Control,
#CV1907-008280-8321
Relevant Project Experience:
■ City Of Palm Desert, On-Call Construction Management Services ■ City of Long Beach, On-Call Construction Management Services ■ Coachella Valley Association of Governments (CVAG), CV Link Multi-Modal Transportation Facility Coachella Valley, CA
■ City Of Menifee, CIP 21-04 Quail Valley Fire Station No. 5, Menifee, CA Anser’s Quality Control Program starts at home. Anser’s QC approach includes hiring only professional, experienced engineers, project managers, construction managers, and construction inspectors. Our project team members have worked for years for various southern California city public works departments, water departments, utility agencies, engineering consulting firms, and contractors. Many have current licenses, registrations, and certifications verifying their credentials and training. All have been successfully vetted and confirmed by the municipal and State Public Agency System rigors, and specific knowledge of the process and system has been brought to each project. Anser then adds our well-established project controls and documents file structure system and implements it with our office engineers and construction coordination specialists to provide continuity, consistency, instant accessibility, and data availability to the City.
On every Anser project, critical QC information is gathered by the Anser project team each working day and compiled into a tracking matrix. This information is then conveyed weekly to the City’s Project Manager and the contractor at the Weekly Project Progress Meeting. This guarantees that all QC issues are discussed with both parties weekly, and the resulting information is documented, tracked, assessed, and distributed to the City and the contractor throughout the project. This method verifies that every week, all parties are aware of the issues, informed in writing, and therefore responsible for the outcome of the project QC issues at hand.
Our Subconsultants
We do not anticipate using subconsultants for this contract. Based on our team’s depth of resources, we anticipate providing all required resources for work under this contract.
Grant Funding
Our team has provided grant services for over 25 years and continues to do so successfully for governmental entities. Our processes and methodologies are industry-leading practices recognized by the Government Accountability Office (GAO) for our work in compliance testing on cost-recovery and grant reimbursement efforts. We will support the City and its staff in tracking all costs associated with its applications for funding allocations and lead the effort in establishing an efficient, effective grant management program that benefits the City and sub-recipients. This requires strategic planning, process development, quality assurance, compliance reviews, detailed documentation, and seamless cost-tracking and reporting processes. It also requires assistance with understanding and properly applying grant guidance, reviewing applications for sub-awards, and assisting with financial and documentation reconciliation activities and other related services, as requested by the City.
Not only do we understand the front-end of planning and funding management required, but we also understand the complexities and details that come with a successful project and program implementation. A successful project begins with having the right staff to develop and manage the project process. Our team is here to provide top-tier visioning and management for the entirety of the City’s grant funding plan. We are proud of our team’s accomplishments alongside our clients and are confident that we can successfully deliver the services requested by the City.
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 4
CM and Inspection
GARDENA
JEFF SCHIPPERS, CCM
CONSTRUCTION MANAGER
Jeff has over 30 years of construction engineering experience in project management, construction management, and contracting for public works, private development, and large public facilities. He has a diverse background in streamlining construction management approaches, implementing new systems, managing diverse personnel, training/mentoring staff, and achieving the highest safety, productivity, and profitability. Jeff is adept at resolving complex construction issues and can operate effectively within the framework of a large public agency structure. He has extensive experience managing subconsultants, designers, materials testing, surveying, and other resources needed to manage a major public works project. Jeff brings experience with state and local government agencies, environmental regulatory agencies, public utility companies, and private utilities. As the owner’s representative, he has managed very large projects up to $200M range with both new and remodeled facilities, including the Anaheim Convention Center Expansion, San Diego Convention Center Expansion, and public works headquarters for the City of Corona Police, Fire, Utility and Public Works.
Education
- MBA, University of Redlands
- BS, Business Management;
University of Redlands
Licenses/Certifications
- Certified Construction
Manager (CCM) #7651
Relevant Project Experience:
■ City of Gardena, LA County Fire Department Station 158 Roof Replacement, Gardena, CA ■ City of Gardena, G-Trans Dispatch Remodel, Gardena, CA ■ CIP Projects, City of Corona Department of Water and Power, Corona, CA ■ Police Department Headquarters and Jail Facility
■ Emergency Operations Center
■ Fire Department Headquarters
■ Community Center
ADAM HUNT, CCM, QSP, ASSOCIATE DBIA
LEAD PROJECT MANAGER
Adam has over 15 years of experience in construction management on projects from inception to close-out for various heavy civil and vertical construction projects. Adam possesses the organizational, critical thinking, technical, and team-building skills required to manage and coordinate all construction projects under his supervision. Adam provides daily communication and oversight, tracking and/or approval of all project records and correspondence, such as payment applications, change orders, RFIs, submittals, schedules/schedule updates, meetings/meeting minutes, monthly reports, invoicing, constructability reviews, and as-built drawings.
Education
- BS, Construction
Engineering Management
Licenses/Certifications
- Qualified SWPPP Practioner
(QSP), #23094
- CMAA Certified Construction
Manager (CCM) #4395
- Associate DBIA
Professional (Assoc. DBIA),
Relevant Project Experience:
■ City of Signal Hill, Signal Hill Library, Signal Hill, CA ■ City of Anaheim, Center Greens Park Improvements, Anaheim, CA ■ City of Anaheim, Brookhurst Teen Center, Anaheim, CA
■ Orange County Waste and Recycling – North & Central Region Landfills, Orange County, CA ■ Colton Sanitary Landfill, Final Closure, Colton, CA
■ City of Signal Hill, Signal Hill Police Station and Emergency Operations Center, Signal Hill, CA Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 5 City of Gardena On-Call
CM and Inspection
GARDENA
TONY GATOFF, CCM, ASSOCIATE DBIA
CONSTRUCTION MANAGER
Tony has over 22 years of construction management experience, delivering successful multimillion-dollar projects from inception to completion with a proven track record of managing all aspects of budget, schedules, scope, and quality. He has demonstrated progressive experience in construction management through leadership skills, communication skills, contract administration, project controls, and making critical decisions during challenges so that risk is controlled and ultimately adds benefit to the project outcome. He also demonstrates industry knowledge of public contract codes, building codes, and regulations. He can execute technical procedures in an organized manner, generating and building relationships and coordinating with owners, clients, architects, engineers, public agencies, utility agencies, and contractors. Tony’s experience with design-bid-build public agency projects includes libraries, essential service facilities (police stations, fire stations, and emergency communications and operations centers), landfill programs, port utility projects, parking facilities, street construction, street utilities, and airport facilities.
Education
- BS, Construction
Engineering Management
Licenses/Certifications
- Certified Construction
Manager (CCM), #4738
- Associate DBIA
Professional
(Assoc. DBIA), #1141951
-Certified Construction
Management Association
of America (CMAA)
Instructor
Relevant Project Experience:
■ City of Signal Hill, Signal Hill Police Station and Emergency Operations Center, Signal Hill, CA ■ Anaheim Transportation Network, Administrative Headquarters and Electric Bus Charging Facility and Maintenance Yard, Anaheim, CA
■ City of Anaheim, Constructability Review for Fire Station No. 4 and 12, Anaheim, CA ■ Orange County Fire Authority, Fire Station No. 17, Cypress, CA ■ Frank R. Bowerman Landfill, Improvement Projects for Orange County Waste and Recycling, Irvine, CA ■ County of Santa Barbara, Tajiguas Sanitary Landfill, Phase 3 Part 2 Partial Final Closure and Groundwater Protection System Phase III, Santa Barbara County, CA
CESAR RAMIREZ
CONSTRUCTION INSPECTOR
Cesar is a Civil Engineering professional with over 28 years of construction and inspection expertise, as well as budgeting, planning, inspection, and staff management experience. He is versatile and capable of providing inspection for every type of construction and has spent most of his career on projects throughout southern California. Cesar’s experience includes numerous CIP projects, including traffic signal upgrades, landscape, street and roadway rehabilitation, water and sewer lines, wells, pressure-reducing stations, and parks. His roadway experience includes rubberized asphalt, cement paving, base paving, recycled asphalt base, aggregate base, lime-treated and cement-treated base, medians, and intersections. He is well versed in Caltrans, Greenbook, and other regulatory standards, plus he understands the recordkeeping requirements and tasks to comply with the various state and federal funding requirements. Education - BSCE, Santo Tomas de
Aquino University
Licenses/Certifications
- Water Distribution D1
Relevant Project Experience:
■ City of Gardena, Vermont Avenue Traffic Signal Upgrade Project, Gardena, CA ■ City of Gardena, 170th Street Improvement Project, Gardena, CA ■ Golden State Water Company (GSWC) Small Meter Replacement Project, Gardena, Lawndale, Compton, CA
■ City of Corona, FY 18/19 Citywide Paving Program, Corona, CA ■ City of Corona, Community Facilities District (CFD) 2001-1 Landscape Renovations, Corona, CA ■ City of Garden Grove, Euclid Street/Garden Grove Blvd/Woodbury Avenue Rehabilitations and Palmwood Sidewalks, Garden Grove, CA
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 6
CM and Inspection
GARDENA
STEPHEN MUTCH, PE, CCM, ASSOC. DBIA, QSD
CONSTRUCTION MANAGER
Stephen has more than 34 years of broad civil, program and construction management and regulatory and environmental experience for various types and sizes of public agency capital improvement projects. His broad civil experience includes vertical building, heavy horizontal, and underground utility projects, piers, ports and essential facilities and systems. Clients rely on his expertise in permitting, project commissioning, stakeholder and third-party coordination, and environmental compliance. His regulatory and environmental experience includes working with the California Department of Fish and Wildlife, Regional Water Quality Control Board, Air Quality Management District, Cal DHS, Army Corp of Engineers, and Coastal Commission.
Education
- BS, Civil Engineering
Licenses/Certifications
- Certified Construction
Manager (CCM), Construction
Management Association of
America (CMAA), #2384
- Registered Civil Engineer,
California, #66757
- Qualified SWPPP Developer
(QSD), #01240
Relevant Project Experience:
■ City of Signal Hill, Signal Hill Police Station and Emergency Operations Center, Signal Hill, CA ■ City of Long Beach, As-Needed Project Management, Construction Management, Public Works Inspections and Job Order Contracting Program Support, Long Beach, CA ■ San Gabriel Valley Council Of Governments, Diamond Bar Golf Course Renovation Project, Diamond Bar, CA
■ City of Seal Beach, Seal Beach Tennis and Pickleball Renovation Project and Pier Renovation, Seal Beach, CA
■ City of Huntington Beach, Program Management, CA
■ City of Anaheim, Sustainability Education Center, Anaheim, CA ■ City of Signal Hill, Signal Hill Library, Signal Hill, CA
LUCAS RATHE, PE, QSD
CONSTRUCTION MANAGER
Lucas is a multi-disciplined resident engineer and project manager who possesses the experience, lessons learned, and communication skills to lead and manage any construction project. Regardless of the cost, scope or complexity, Lucas implements the fundamentals of construction management to maintain safety, quality, schedule and compliance on any project.
These fundamentals are rooted in communication and decision making for what is best for the project to move forward to maintain schedule, reduce risk, and maintain budget. Lucas’ expertise is in federally-funded transportation projects with Caltrans Local Assistance oversight.
He understands that document control and following the process of the Local Assistance Procedures Manual (LAPM) or Caltrans Construction Manual is paramount for Caltrans or local agencies to maintain their level of funding. As a result, the quality of the final product complies with the specified standards and always meets or exceeds the expectations of the communities where the projects are built.
Education
- BS, Civil Engineering
- BA, Mathematics
Licenses/Certifications
- CA Professional Engineer
#76273
- Qualified SWPPP Developer
#21590
Relevant Project Experience:
■ County of San Diego, Gillespie Field Vehicle Service Road to West Transient Ramp, San Diego, CA ■ Riverside County Transportation Commission, I-15 SMART Freeway Project, Temecula, CA ■ City of Indio, Herbert Hoover Elementary School Pedestrian Improvement Project, Indio, CA ■ Mission Springs Water District, Regional Water Reclamation Facility, Desert Hot Springs, CA ■ San Diego Association of Governments (SANDAG), I-805 Transit Only Lane, San Diego, CA ■ Riverside County Transportation Department (RCTD), Scott Road Interchange Project, Menifee, CA ■ RCTD, Avenue 66 Grade Separation Project, Mecca, Riverside County, CA ■ City of Menifee, CIP 16-08 Citywide Traffic Signal Project (EAST), Menifee, CA Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 7 City of Gardena On-Call
CM and Inspection
GARDENA
4. Organization Chart
Water/Sewer/Utilities
Construction Managers
Jeff Schippers, CCM*
Gary McCredie, CMIT
Pedram Abbassi, LEED AP BD+C,
QSP, CESSWI
Kamran Panah, PhD, MPA, PE
Hamed Soltani, PE
Andres Adame
Bryan Tuschoff, CMIT, QSP
Construction Inspectors
Cesar Ramirez* Tom Hall
Jeremy Hooper
Jeff Martinez
Paul Morales
Lead Project Manager
Adam Hunt, CCM, QSP, Associate DBIA *
Principal-In-Charge
Tyson Atwood, PE, QSD*
Buildings/Facilities
Construction Managers
Adam Hunt, CCM, QSP, Associate
DBIA * Tony Gatoff, CCM* Stephen Mutch, PE, CCM, ASSOC.
DBIA, QSD*
Chris Heidel, CCM
John Reidinger, CCM
Benjamin Torres, CMIT, CPSI,
LEED GA
John Duong, CCM, EIT
Construction Inspectors
Ryan Carey, CMIT
Ryan Marcy
Paul Morales
Roadways/
Infrastructure
Construction Managers
Lucas Rathe, PE, QSD * Ricardo Sanchez, PE
Musaab Al Madhadi, EIT
Greg Gwozdz, PE
Kirk Streets
Kenny Casados
Rajan Kariya, PE, QSD
Construction Inspectors
Cesar Ramirez*
Dakota Mebane
Michael Chevalier
Ronnie Chevalier, CHST
Nick Deile, QSP
Paul Morales
We have assembled a highly experienced team of experts to provide the City with construction management and inspection services. Our personnel that will be primarily responsible for working on this contract will be Tyson Atwood, PE, QSD and Adam Hunt, CCM, QSP, Associate DBIA. Resumes and qualifications for all of the key personnel provided on the organizational chart below are presented in section 8 of the response. Resumes for additional staffing can be made available upon request or per task order. We have additional staff that can be placed as-needed per project. We have over 250+ technical staff in Southern California that can be available to best service the City's needs within short notice.
* Key Personnel
Administration
Project Coordinator
Rachael Highley, CMIT
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 8
CM and Inspection
GARDENA
5. Similar Projects
CITY OF GARDENA
CONSTRUCTION MANAGEMENT AND INSPECTION
VERMONT AVENUE TRAFFIC SIGNAL UPGRADE PROJECT Under the legacy firm Wallace & Associates, Anser provided construction management and inspection services for the Vermont Avenue Traffic Signal Upgrade Project JN 930. The project consists of upgrading the traffic signal system for two intersections: the Vermont Avenue intersection with Rosecrans Avenue and the Vermont Avenue intersection with Redondo Beach Boulevard.
The project also consists of localized PCC pavement reconstruction, including new PCC pavement, curb, gutter, and sidewalk as part of a left turn lane extension. The ADA curb ramps will also be R&R for both intersections. The TSS of both intersections will be extensively upgraded by replacing traffic signal poles, vehicular and pedestrian heads, cabinets, battery backup, detectors, streetlights, street names, signages, and striping, as shown on the plans and specifications.
Personnel: Cesar Ramirez (Inspector)
170th STREET IMPROVEMENT PROJECT
This project was an STP-L funded project with a Federal Aid Project No. STPL-5276 (032). The project consists of AC resurfacing (coldmill/overlay and Depth replacement), concrete flat work (curb, gutter, sidewalk, driveway approach, curb ramps, cross gutters, and similar), removal and replacement of trees, traffic signal upgrades (Battery backup and APS retrofit) and striping/signages and striping as shown on the plans and specifications. The project was given a 60 working-day construction schedule and a construction budget of $470,000.
Personnel: Cesar Ramirez (Inspector), Pedram Abbassi (CM) GARDENA FIRE STATION 158, ROOF REPLACEMENT PROJECT (pictured) Construction Manager for the $800K upgrades to this fire station. This work included lead and asbestos abatement, new framing and ceilings with wall repairs, new lighting and lighting control, and coordination with the existing Emergency Fire Call System. It also included new rooftop HVAC and exhaust units, wall, fire pole, kitchen, dormitory, team room, and toilet room upgrades. New ductwork and plumbing infrastructure were also added.
Personnel: Jeff Schippers, CCM, (CM) Rachael Highley, CMIT (Project Corrdinator)
YEARS SUPPORTED
2016 - Present
REFERENCE
William E. Mendoza, PE, Associate
Engineer
[email protected]
310.217.9608
ADDITIONAL PROJECTS
• G-Trans Dispatch Remodel
(pictured)
• G-Trans Bus Charging Facilities
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 9 City of Gardena On-Call
CM and Inspection
GARDENA
CITY OF ANAHEIM
ON-CALL CONSULTING SUPPORT SERVICES
PROJECT HIGHLIGHT: Brookhurst Community Center, Teen Room Addition (pictured) Anser provided construction management services on the Brookhurst Community Center, Teen Room Addition project in the City of Anaheim. The center provides a space where the area’s youth can come together for group activities, movie nights, educational workshops, and spend time with friends. The $1M Brookhurst Teen Center project included a 735 square foot (SF) teen room addition to the Brookhurst Community Center with full dry-erase walls, tackable wallboards for pin-up pictures or flyers, internal restrooms, new sewer connections, concrete pathways and other hardscape, striping/ parking, and landscape improvements.
Personnel: Adam Hunt, CCM, QSP (CM)
PROJECT HIGHLIGHT: Lincoln Avenue Widening Improvements (pictured) Anser provides construction management services on this project consisting of roadway widening and paving, sidewalks, slough walls, planter walls, curbs and gutters, median islands, hardscape, landscaping and irrigation improvements, signing, striping, traffic signal improvements, street lightning, building modification improvements, business sign and pole relocations, drainage improvements, WQMP BMP improvements, and TCE areas. This project is funded through The Regional Capacity Program (Project O) .
Personnel: Adam Hunt, CCM, QSP (CM) and Chris Heidel, CCM (POC) PROJECT HIGHLIGHT: Center Greens Park Improvements (pictured) Anser provided construction management services on this project including new landscaping and irrigation, new and relocated lighting, upgraded basketball court, new skate park, challenge course, decomposed granite pathways, concrete pathways and other hardscape, shade structure, seat walls, water capture basins, furnishing, and other appurtenant work. The project improved the park with a new tot lot, youth challenge course, skate park, upgraded basketball court, landscaping, fitness trails, butterfly garden, shaded community plaza, and more. The new amenities will promote and increase physical, social, and cultural activities and will contribute positively to the lives of both the surrounding neighborhood of the park and all Anaheim residents.
Personnel: Adam Hunt, CCM, QSP (CM)
YEARS SUPPORTED
February 2023 - Current
REFERENCE
John Martin
Construction Contracts
Administrator
[email protected]
714.765.5157
ADDITIONAL PROJECTS
• Sustainability Education Center
• Cerritos Avenue and
South Street Water Mains
Replacement
• Alley Sanitary Sewer
Improvements 2020 (ASSIP)
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 10
CM and Inspection
GARDENA
CITY OF LONG BEACH
ON-CALL PROJECT MANAGEMENT AND CONSTRUCTION
MANAGEMENT SERVICES
PROJECT HIGHLIGHT: El Dorado Park Artificial Turf Soccer Field (pictured) Anser provided an artificial turf soccer field with an integrated high-pressure cooling system, new portable goals, new protective netting behind the goal, and new decorative fencing. New ADA curb ramps, pathways, and parking were also added. Landscaping and site improvements included trees, sod, irrigation, multiple retention basins, field drainage network, decorative etched boulders, sidewalks, parking lot speed bumps, and a new hydration station. The project also included adding a new City meter, backflow, and Wi-Fi landscape irrigation controllers. Anser completed construction under budget by $1.2M on schedule and coordinated with the City to add a new water meter and backflow assembly scope.
Personnel: Stephen Mutch, PE, CCM (CM) and Benjamin Torres, CMIT, LEED GA (CM) PROJECT HIGHLIGHT:Scherer Park Community Center Renovation Anser provided Owner’s Construction Management services for the City of Long Beach Scherer Park Community Center renovations. The project provides full interior and exterior renovations to the existing community center and public restrooms, public breezeway, new ADA parking, and hardscape improvements. This project is nearing the award phase and will require multi-level coordination to minimize the impact on the public’s use of this site. The City actively holds after-school tutoring sessions and will also hold summer community programming. Anser has provided constructability reviews, cost estimating, scope phasing plans, proposal reviews, and recommendations to minimize community programming interruptions. Our team will continue to provide construction management services throughout all phases of this project.
Personnel: Benjamin Torres, CMIT, LEED GA (CM) and Ryan Marcy (Inspector)
YEARS SUPPORTED
1996 - Current
REFERENCE
Marilyn Surakus, Project
Management Bureau Manager
[email protected]
562.570.5793
ADDITIONAL PROJECTS
• Michelle Obama North Branch
Library (pictured)
• Recreation Park Playground
Renovation (pictured)
• Willow Springs Wetland
Restoration
• Emergency Communications
and Operations Center
• DeForest Wetlands Park
Rehabilitation
• Los Cerritos Channel
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 11 City of Gardena On-Call
CM and Inspection
GARDENA
CITY OF MURRIETA
ON-CALL PROJECT/CONSTRUCTION MANAGEMENT
PROJECT HIGHLIGHT: Town Square Park Amphitheater Phases 1, 2 and 3 (pictured) Anser provided construction/project management, inspection, and labor compliance services on this multiple-phase park and amphitheater project. The tiered-seating theater has over 750 built-in seats and can hold 5,000 people total in the surrounding grass area. This long-awaited project provides an accessible, community gathering place for the residents of Murrieta to enjoy events, concerts, and performances. • Phase 1: Phase 1 included the design and construction of a 4‐acre park, which included landscape, irrigation, lighting, restroom, and an amphitheater.
Additionally, it included construction of loop and entry roads, potable water well, and reclaimed water connections.
• Phase 2: Phase 2 included the design and construction of a semi‐circular backdrop and covering for the amphitheater that incorporated high-quality sound and lighting for the various concerts, productions, and events. It also included the construction of an enclosed storage area and dressing/green room (offstage area) for performers.
• Phase 3: Phase 3 consisted of the redesign of lighting surrounding the park by allowing for individual lighting controls. Installation of a sound system, security cameras, and Wi‐Fi were also included.
Personnel: Bryan Tuschhoff, CMIT, QSP (CM), John Reidinger, CCM (CM), Rachael Higley, CMIT (Project Coordinator) and Cesar Ramirez (Inspector) PROJECT HIGHLIGHT: Vietnam Veterans Memorial Project (pictured) This $400K veteran’s memorial project included demolition of the existing Vietnam Memorial mock-up and appurtenances, earthwork grading, excavation and construction of new concrete cast-in-place monument footings and walls, installation of City-provided granite panels with laser-engraved Vietnam War photographic images, and construction of a decomposed granite pathway with concrete mow curbs and synthetic turf.
Personnel: Bryan Tuschhoff, CMIT,QSP (CM) and Rachael Higley, CMIT (Project Coordinator)
YEARS SUPPORTED
2017 - Present
REFERENCE
Jeffrey Hitch, PE
Principal Civil Engineer
[email protected]
951.461.6076
ADDITIONAL PROJECTS
• Murrieta Senior Center
Improvements (pictured)
• Murrieta Sports Park
• Pedestrian Safety
Enhancements
• Warm Springs Parkway North
Improvement Project
• Warm Springs Parkway South
Improvement Project
• Pioneer Park Tot Lot
Improvement
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 12
CM and Inspection
GARDENA
CITY OF ONTARIO’S MUNICIPAL UTILITIES
COMPANY
ON-CALL PROJECT MANAGEMENT SERVICES
PROJECT HIGHLIGHT: UT1046 San Antonio Transmission Water Main Anser provided construction management and inspection services for the UT1046 San Antonio Transmission Water Main project. The construction occurred in the City of Upland along 8th Street, between San Antonio Avenue and South Fern Avenue.
The work consisted of the installation of approximately 85 linear feet of 60-inch diameter steel casing, approximately 60 linear feet of 48-inch diameter steel casing, approximately 200 linear feet of 30-inch diameter cement-mortar lined & coated CML&C WSP, and approximately 1,290 linear feet of 36-inch diameter CML&C WSP potable water transmission main; ground improvements by permeation grouting, including subsurface investigations, installation of water appurtenances connections to existing pipelines; pipeline abandonments and removals, temporary water supply line (Highline); implementation of traffic control during construction, pavement repair, grinding and overlays, and striping restoration.
Personnel: Bryan Tuschhoff, CMIT, QSP (CM) and Rachael Higley, CMIT (Project Coordinator)
PROJECT HIGHLIGHT: Ut1050 Ontario Ranch Phase 2 Water Main Improvement Project Anser provided construction management and inspection services for the UT1050 Ontario Ranch Phase 2 Water Main Improvement Project. The construction took place in the City of Ontario along Grove Avenue between Eucalyptus Avenue and Chino Avenue and Chino Avenue between Grove Avenue and the Chino Avenue Bridge (Cucamonga Creek). The work consisted of the installation of approximately 7,900 linear feet of 30- inch diameter CML&C Water System Planning (WSP) water main and 8,600 linear feet of 18-inch diameter CML&C WSP water mains and a Pressure Reducing Station; installation of water appurtenances; connections at various street intersections; implementation of traffic control during construction, temporary paving, pavement repair, and street restoration.
Personnel: Bryan Tuschhoff, CMIT, QSP (CM) and Rachael Higley, CMIT (Project Coordinator)
YEARS SUPPORTED
2016 - Present
REFERENCE
Omar Gonzalez, Senior Associate
Civil Engineer
[email protected]
909.395.2578
ADDITIONAL PROJECTS
• Water Main Replacement
Phase 1
• UT 1027 Well House Roof
Replacement Project
• UT 1036 Recycled Water
Improvements for Riverside
Drive
• UT1016 Archibald Sewershed,
• UT1018 North Vineyard Sewer
• UT1060 Water Replacement
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E 13 City of Gardena On-Call
CM and Inspection
GARDENA
6. References
7. Fee Schedule
Labor
Position Key Staff Billing Rate
Principal Tyson Atwood $280.00
Construction Manager, Senior $255.00
Construction Manager, IV $215.00
Construction Manager, III $180.00
Construction Manager, II $150.00
Construction Manager, I $125.00
Inspector (Prevailing Wage) $190.00
Inspector, Senior $175.00
Inspector $155.00
Document Control, Senior $115.00
Document Control $95.00
Labor Compliance Manager $135.00
Labor Compliance Analyist $110.00
ODC's (Reimbursable Expenses)
Description Unit Rate
Vehicles* Month $1,350.00
POV Mileage Exp. per IRS rate
CM Software (As-Requested) Per Project $3,500 - $5,500
Subconsultant Mark-Up 0%
* Max Rate. Billed as a percentage of actual hours billed
AGENCY NAME TITLE EMAIL PHONE NUMBER
City of Gardena William E. Mendoza, PE Associate Engineer wmendoza@ cityofgardena.org
310.217.9608
City of Anaheim John Martin Contstruction
Contracts
Administrator
[email protected] 714.765.5157
City of Long Beach Marilyn Surakus Project Management
Bureau Manager
marilyn.surakus@
longbeach.gov
562.570.5793
City of Murrieta Jeffrey Hitch, PE Principal Civil Engineer JHitch@MurrietaCA. gov
951.461.6076
City of Ontario Omar Gonzalez Senior Associate Civil
Engineer
oegonzalez@ontarioca.
gov
909.295.2578
Docusign Envelope ID: B9C75174-9BAD-49C8-9062-9AFBDF1BDD4E City of Gardena On-Call 14
CM and Inspection
GARDENA
8. Resumes
ANSERADVISORY.COM
TYSON ATWOOD, PE, QSD
PRINCIPAL IN CHARGE
For over 20 years, Tyson has worked in the construction industry, managing increasingly complex projects and multiple projects over $100 million in construction value. He has a diverse background managing projects in the municipal, transportation, aviation, energy, and water/wastewater industries. Tyson's focus has been working with federal funds, and he is an expert in administering projects utilizing the Caltrans Local Assistance Procedures Manual (LAPM).