Cities Index.
Agenda packet

Gardena City Council
September 10, 2024

Document
Agenda packet
Meeting
September 10, 2024
Body
Gardena City Council
Pages
48
Original file
206.5 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Salvador Gutierrez, E.I.T.

Senior Electrical Designer
[email protected]| www.breendesign.com
310-464-8404
Salvador joined Breen Design Group in 2016 and has become a valuable member of the MEP team. Salvador has built up his experience and knowledge in several different fields such as project managing, drafting, and technical support.

His involvement with numerous apartments, condo, and retail projects has allowed him to vastly expand his skills in electrical engineering design. Salvador is currently working on the electrical design for various new and ongoing Multifamily apartment projects.

Project Experience
Torrance Police Department: Replacement UPS, Torrance, CA City of Roseville: Shop Retrofits for CNG Vehicles, Roseville, CA City of San Mateo: Vehicle Maintenance Facility CNG Retrofit, San Mateo, CA City of Torrance: Fleet Garage CNG Upgrade, City of Torrance, CA City of San Diego: CNG Fueling Station: , City of San Diego, CA Hudson Avenue Condominiums, Los Angeles, CA
LA County Curtis Tucker Health Care Center, Inglewood, CA 823 S. Los Angeles, Los Angeles, CA
E. on Adams, Los Angeles, CA
Beverly Blvd: Mixed Use, Los Angeles, CA
Greenfield Ave: Market Rate, Los Angeles, CA
Westmont Vista: New Build Affordable Multifamily, Los Angeles, CA Bonobos: Retail Shop, Los Angeles, CA
Villa de Guadalupe: Modernization, San Jose, CA
4121 Santa Monica Blvd: Mixed Use, Los Angeles, CA
ZOE apartments, Los Angeles, CA
NoHo: Mixed Use, Los Angeles, CA
James Wood Apartments, Los Angeles, CA
Main & 9th: Mixed Use, Riverside, CA
Huntley: Townhomes, West Hollywood, CA
Metamorphosis on Foothill: Affordable Housing, Sylmar, CA Rosa de Castilla, Los Angeles, CA
Education
Electrical Design & Construction
Extension Course, UCLA, 2017
BSc., Electrical Engineering
Cal Poly Pomona, 2013
Experience
BREEN Design Group, Torrance, CA
Senior Electrical Designer, 2016 to
Present

Page 35 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Joper Tupas, P.E.

Plumbing Engineer / Project Manager
[email protected]| www.breendesign.com
310-464-8404
Joper has twenty years of plumbing and fire protection (fire sprinkler) systems design, project management and plumbing construction experience on projects in California. A graduate in Mechanical Engineering, Mr. Tupas has experience with a variety of educational projects from K-12 to higher education experience including laboratory and science building projects. Projects that are under Department of State Architect’s and State Fire Marshall’s Authority Having Jurisdiction and Cal State University Standards.

Project Experience
City of Torrance: Fleet Garage CNG Upgrade, City of Torrance, CA Torrance Unified School District: Multiple School Site Upgrades, Torrance, CA Chimbole Cultural Center: New Build, City of Palmdale, CA Miramar Place: CNG Facility Upgrade, San Diego CA
City of Banning: CNG Facility Upgrade, Banning CA
Fort MacArthur Building 403 Community Center: Seismic Strengthening, San Pedro, CA
Project Homekey, Quality Inn Thousand Oaks: Motel Conversion to Supportive Housing, Thousand Oaks, CA
Marina Manor-Hacola: Plumbing Site Inspection, Marina Del Rey, CA Villa Florence Retail Space: MEP Assessment, San Francisco, CA Villa Florence Hotel: Property Condition Assessment survey and Report for New Owners, San Francisco, CA
Hilton Garden Inn: Property Condition Assessment survey and Report for New Owners, Freemont, CA
Seattle Airport Marriott: Boiler Assessment, Seattle, WA Customs and Border Protection/USPS IMF: Tenant Improvement, Torrance, CA P612 Hangar 34 Point Mugu Naval Base: Fire Sprinkler, Point Mugu, CA FORT MacArthur: Dorm Building 33 Renovation, San Pedro, CA Los Angeles Air Force Base : Buildings 270-272, El Segundo, CA LA County DPW Headquarters Sewer & Storm Drain Feasibility, Los Angeles, CA LAUSD Aldama ES: Relocatable Modular Buildings, Los Angeles, CA LAUSD Aldama ES: Main Building Seismic Retrofit, Los Angeles, CA Willow Tree Inn: Adaptive Reuse, Compton, CA
Studio-6: Motel Conversion to Support Housing, Anaheim, CA LAUSD: Multiple School Site Upgrades, Los Angeles, CA
Glendale Unified School District: Multiple School Site Upgrades, Glendale, CA AUSD Dalton Elementary: School Modernization, Azusa, CA MVSD Baker Elementary School: Modernization, El Monte, CA Education
Mastering the Art of Design Firm
Management, Kyle Davy Consulting,
San Francisco, CA
Mastering the Art of Design Firm
Project Management, Kyle Davy
Consulting, San Francisco, CA
Certificate in Sequential Program in
Plumbing Systems Design, University
of California, Los Angeles (UCLA)
BS, Mechanical Engineering, Colegio
San Agustin – College of Engineering,
Bacolod City, Philippines
Professional Registration
Professional Engineer, M-35317, CA
Certified in Plumbing Design, CPD 60242,
ASPE
NCEES # 51420
Professional Engineer, PE-16489, HI
Professional Engineer, PE-81010, FL
Professional Affiliations
International Code Council (ICC)
National Fire Protection Association
(NFPA) – Associate Member
American Society of Plumbing
Engineers (ASPE) – Full Member
National Council of Examiners for
Engineering and Surveying (NCEES)

Page 36 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Evan Fernandez
Director of Civil Engineering
[email protected] | www.breendesign.com
Evan was promoted to Director of Civil Engineering in early 2022, having been with BREEN for 10 years. He oversees a talented group of engineering staff. Evan has the technical and managerial responsibility for various project types involving low impact development (LID), grading plans, storm drainage, hydrology and hydraulics calculations, street plans and utility projects. One of his primary focus points in the industry is stormwater design within the greater Los Angeles and Orange County areas. Evan collaborates with architects, landscape architects, and engineers to find innovative and creative civil design solutions in multi-family housing projects, community parks and variety of public and private commercial developments. Evan’s skill sets include site grading & drainage, stormwater solutions, water retention, ADA/CA-Title 24 regulations, site hardscape & landscape and sustainable design. Evan has extensive experience with state, city and county regulatory agencies including LA County Public Works.

Project Experience
Carson Circuit: Victoria Regional Transit Center, City of Carson, CA City of San Fernando: San Fernando Yard CNG Fueling Station, San Fernando, CA City of Banning: CNG Facility Upgrade, Banning, CA
Jordan Downs Phase S2 & S3: Affordable housing project, Los Angeles, CA (City Road Rehabilitation, Utility Improvements, LA City B-Permit) Jordan Downs: Phase S4 & S5 with children’s Park, Los Angeles, CA (City Road Rehabilitation, Utility Improvements, LA City B-Permit, onsite improvements with stormwater mitigation)
Parcel 44: LA County Street Improvements, Marina Del Rey, CA Villa Del Mar: Modernization/Remodel. A County street improvements, Marina Del Rey, CA
Metamorphosis: New Build Affordable Development, Sylmar, CA (LA City B-Permit)
Onyx Apartments: New Mixed Use Building, Los Angeles, CA (LA City B-Permit)
Wilshire Grand Center: Mixed Use, Los Angeles, CA
(LA City B-Permit)
Mosaic Gardens at Willowbrook: New Build, Willowbrook, CA (Street Improvements)
American Martyr O’Donnell Center: Onsite and Street Improvements, Manhattan Beach, CA
Avalon Green Alleys, Los Angeles, CA
(LA City Street Improvements & Stormwater Mitigation)
Education
B.S., Civil Engineering, 2011
California State University,
Long Beach, CA
Experience
BREEN Design Group, Torrance, CA
Director of Civil Engineering,
February 2022 to Present
Civil Engineering Designer,
2012 to 2022
Civil Engineering Intern, 2011

Page 37 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 David Lee, S.E.

Director of Structural Engineering
[email protected]| www.breendesign.com
310-464-8404
David has over 18 years of experience in structural engineering in Southern California and is our Director of Structural Engineering. His experience encompasses design and management of diverse projects and construction types both existing building renovations and new building design. These include historic buildings, hospital facilities, federal properties, places of worship, educational facilities, single & multifamily residential buildings, and seismic evaluations.

David is a savvy engineer who can design to existing conditions either to accentuate the structural forms or insert the system surgically and concealed. He has strong relationships and proven experience with regulatory agencies including LADBS and California Division of the State Architect.

Project Experience
City of San Diego: CNG Fueling Station for Refuse & Recycling, San Diego CA City of Torrance: Fleet Garage CNG Upgrade, Torrance, CA City of Torrance: Transit Garage CNG Upgrade, Torrance, CA City of San Fernando: San Fernando Yard CNG Fueling Station, San Fernando, CA City of San Mateo: CNG Vehicle Maintenance Facility, San Mateo, CA The Promenade Apartments: Structural Assessment, Rancho Cucamonga, CA Big Bear Mountain: Airport Terminal Building, Big Bear, CA LAUSD: Widney HS Cooling Tower Replacement, Los Angeles, CA 675 South Arroyo Parkway: Structural Assessment, Pasadena, CA 3351 43rd Place: Fire Damage Repairs and Rehabilitation, Los Angeles, CA Nordhoff Apartments: Seismic Retrofit, North Hills, CA
Roscoe Apartments: Retrofit of Existing Wood-Framed Apartment, North Hollywood, CA
Saticoy Apartments: Retrofit of Existing Buildings, North Hollywood, CA Hawaiian Gardens Seismic Retrofit, Hawaiian Gardens, CA Coral Wood Court Apartments: Retrofit of Existing Buildings, Reseda, CA Hotel Rosslyn: Seismic Retrofit, Los Angeles, CA
Alexandria Apartments: Seismic Retrofit, Los Angeles, CA Seismic Evaluation and Upgrade of Existing Warehouse, Glendale, CA Rampart Apartments: Structural Feasibility Study, Los Angeles, CA 16220 S Figueroa St: Structural Assessment, Gardena, CA 569 W 6th St. San Pedro: New Affordable Housing, San Pedro, CA 336 San Pedro: New Mixed-Use, TOC, San Pedro, CA
Education
B.S., Structural Engineering
University of California, San Diego
M.S., Structural Engineering
University of California, San Diego
Professional Registration
Structural Engineer, State of California,
SE 5881
Civil Engineer, State of California,
CE 70897
Experience
BREEN Design Group, Torrance, CA
Director of Structural Engineering,
2012 to Present
Degenkolb Engineers, Los Angeles, CA
Design Engineer, 2002 - 2012

Page 38 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448

CORNERSTONE STUDIOS
Jeff Woo Kim, PLA, ASLA
Principal
Mr. Kim has over twenty four years of experience with Cornerstone Studios. He brings a thoughtful and creative approach to each of his clients and projects. His keen sense of design, project management skills, and attention to detail are integral to the success of his project.

With extensive experience working with numerous government agencies, he excels in projects at the city, county, or federal level and possesses a good understanding of the requirements needed to complete the project. He is responsible for implementation of conceptual design through completion of construction documents as well as coordination with teams of sub-consultants. education Bachelor of Science Landscape Architecture, College of Environmental Design, California Polytechnic University, Pomona
registration Licensed Landscape Architect (California) #6082 affiliation Member, American society of Landscape Architects (ASLA)

Page 39 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448

CORNERSTONE STUDIOS

SUMMARY OF RELATED EXPERIENCE
Sea Country Senior Community Center - Laguna Niguel, CA Mr. Kim was the designer and project manager for this senior community center. The project consists of a courtyard expansion and exterior landscape up-grade to a secondary entry to the new wing of the building. The challenge is to blend the existing with the new in design and in selections of materials in order to maintain a unified theme.

Civic Center Landscape Enhancement – Irvine, CA
Mr. Kim was the landscape designer on this project. He prepared the various options for expanding the urban character in the front to enhance the presence of the City Hall at the corner of Alton and Harvard and preserving the openness of the space at the same time. In addition, he oversaw the production of all the graphics for presentation to the City.

LAPD Metro Division Facility - Los Angeles, CA
Mr. Kim was responsible for schematic design, design development, and construction documents on this project for the LAPD Metropolitan Division. He was in charge of selecting the overall planting palette, provided designs for a neighborhood pocket park, staff courtyard, upper deck patio rooftop garden. He also worked with civil engineers in designing bio-swale application for on-site runoff treatment.

LABH Harbor Navigation Center - Los Angeles, CA
The San Pedro Navigation Center located on the LAPD Harbor Division Property helps those experiencing homelessness securely store their belongings and receive case management services. Clumps of Agave, Cactus and succulents are planted in a grid with linear hardscape bandings made up of contrasting colors of decomposed granite. A series of biofiltration areas have been designed throughout the site to mitigate the LID requirement.

Daisy Bike Boulevard – Long Beach, CA
Mr. Kim was involved in this 9-mile bike boulevard project. He was responsible for developing and presenting drought tolerant landscape design options for the traffic circles, roundabouts, and medians along this corridor. After carefully analyzing the site conditions, he prepared schematic concepts by selecting two representative roundabouts and presented them to the City for approval. He also coordinated with the City and consulting engineers in developing bio-retention and bio-swale where feasible as part of storm water management practice.

Century Boulevard – Inglewood, CA
Mr. Kim was involved in this project from schematic design through construction documents.. He coordinated with the City Manager and staff engineers to address the existing issues and explored various drought tolerant plants and pervious hardscape options. He also coordinated with team members in preparation of 3D graphics to present to the council the existing and the proposed conditions.

City of Laguna Niguel Plan Check – Laguna Niguel, CA
Mr. Kim was responsible for reviewing and plan checking various landscape projects for the city of Laguna Niguel including senior community center, streetscape, City center, residential and multi‐family housing projects.

Page 40 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448

CORNERSTONE STUDIOS
Mr. Wilson has command of the full range of design, technical, cost, and project management issues for a wide range of design and landscape projects realized during his 40-years experience in the profession.

Through his expertise in landscape architecture, construction, and project realization, he guides designs from inception on and always with a focus on ensuring a well-crafted project that is buildable and on budget. He has prepared master plans, visual studies, water conservation studies, and guidelines for parks, schools, streetscapes and housing communities. His project designs emphasize lower maintenance, compatible plant associations, accessibility for all, and the repurposing of sites and materials.
education Bachelor of Landscape Architecture
University of California, Berkeley
registration Licensed Landscape Architect (California) #1746 CLARB Registration
affiliation Member, American Society of Landscape Architects (ASLA) Don Wilson, PLA, ASLA
Principal

Page 41 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448

CORNERSTONE STUDIOS

SUMMARY OF RELATED EXPERIENCE
Firestone Boulevard Streetscape and Downtown Gateway Redesign – Downey, CA Mr. Wilson was principal-in-charge of these two projects. The streetscape consists of a 13-mile corridor of Firestone Boulevard, the main City arterial. The Downtown Gateway includes three blocks of Firestone Boulevard. He directed all the schematic presentations and attended on all the meetings with the City Engineers on both projects.

Metro Purple Line 2, Los Angeles, CA.

As QA/QC manager, Mr. Wilson provided document control during Intra and Interdisciplinary review process at milestone submittals. He was also in charge of preparing specifications for Metro and Agency submittals.

CHP Headquarters - San Diego, CA
As principal-in-charge, Mr. Wilson was responsible for overseeing the contract, preparation of design, presentation graphics, construction drawings and specifications, and coordination with WLC Architects and the project design team. He worked closely with our project manager to coordinate the work throughout the design process. He also ensured that all planting and irrigation design met the current requirements of the State of California.

City of Lake Forest Plan Check – Lake Forest, CA
Mr. Wilson was the project manager responsible for reviewing and plan checking various landscape projects for the city including civic facility, park, retail, streetscape, residential and mixed use development since 2013.

Bristol Street Medians – Costa Mesa, CA
Mr. Wilson was project manager for the new median planting and irrigation and for supervising the work including design and construction documents. He was responsible for overseeing the design of a new subsurface irrigation system as well as coordinating work with the engineering project manager, making presentations and attending review meetings.

Firestone Boulevard Bio-Swale - Downey, CA
Mr. Wilson was principal-in-charge of the design and implementation of the streetscape bioswale.

His coordination with the civil engineers and the City on the bioswale design was instrumental in the success of project.

Fire Station No. 78 – Los Angeles, CA
As project manager, Mr. Wilson was responsible for the contract, preparation of working drawings, specifications, construction administration, and coordination with the architect. He also reviewed all design submittals for quality control and worked with the project manager and the architect in resolving issues that were presented by the sites’ constraints.

Page 42 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 City of Gardena – Public Works Department
Architecture and Landscape Architecture - On-Call Design Services Statement of Qualifications
BREEN Design Group
3825 Del Amo Blvd., Torrance, CA 90503 ● (310) 464-8404 ● www.breendesign.com The following documents are provided in support of our response to this RFQ:

DGS Small Business Certification
City of Torrance Business License
Dept of Industrial Relations – Public Works Contractor Registration Certificate of Liability Insurance

SECTION I

SUPPORTING DOCUMENTS

Page 43 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Certification Type Status From To
SB Approved 01/30/2024 01/31/2026
Printed on: 1/30/2024 4:31:41 PM
To verify most current certification status go to: https://www.caleprocure.ca.gov Office of Small Business & DVBE Services
Certification ID: 1041202
Legal Business Name:

BREEN Design Group, Inc.

Doing Business As (DBA) Name 1:

BREEN ENGINEERING, INC.

Doing Business As (DBA) Name 2:

Breen Engineering
Address:
3825 Del Amo Blvd.,

TORRANCE
CA 90503
Email Address:
[email protected]
Business Web Page:
www.breendesign.com
Business Phone Number:
310/464-8404
Business Fax Number:
310/464-8408
Business Types:

Service
Stay informed! KEEP YOUR CERTIFICATION PROFILE UPDATED! -LOG IN at CaleProcure.CA.GOV
Questions?
Email: [email protected]
Call OSDS Main Number: 916-375-4940
707 3rd Street, 1-400, West Sacramento, CA 95605

Page 44 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 BREEN ENGINEERING, INC.
1983 WEST 190TH STREET UNIT 200
TORRANCE, CA 90504

THIS BUSINESS LICENSE MUST BE DISPLAYED AT PLACE OF BUSINESS

BUSINESS LICENSE

CITY OF TORRANCE

READ REVERSE SIDE
Exp Date: 12/31/2024

LICENSE NO
BL-LIC-001716

CATEGORY AMOUNT PAID
$3,102.00

ISSUE DATE
1802 - Business Consultant 3/8/2024
Annual business tax is due and payable January 1 st
each year, and is delinquent# not paid on or before
the last day of January each year. ISSUED TO:

BREEN ENGINEERING, INC.
1983 190TH ST UNIT 200
TORRANCE, CA 90504

ISSUED BY FINANCE DEPARTMENT
At

ASSISTANT FINANCE DIRECTOR
THIS LICENSE IS GOOD UNTIL VOIDED OR REVOKED. IT BECOMES VOID UPON ANY CHANGE OF OWNERSHIP OR LOCATION Notify the LICENSE SUPERVISOR in Writing of any Changes lin Ownership or Address. City Hall, 3031 Torrance Blvd., Torrance, CA 90503-5015

Page 45 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Registration Services:: Page 1 of 2 11/14/2023 1:23:09 PM

APPLICATION FOR

PUBLIC WORKS CONTRACTOR REGISTRATION
Registration Information
Type: Public Works
Period: 11/14/2023 06/30/2026
Contractor Information
Contractor Name: Breen Engineering, Inc.

Trade Name:

License Type Number: PW-LR-1000634566
Contractor Physical Address
Physical Business Country: United States of America Physical Business City/ Province:

Torrance
Physical Business Address: 1983 W, 190th Street #200 Physical Business State: CA Physical Business Postal
Code:
90504
Contractor Mailing Address
Mailing Country: United States of America Mailing City /Province: Torrance Mailing Address: 1983 W, 190th Street #200 Mailing State: CA Mailing Postal Code: 90504
Contact Info
Daytime Phone: Daytime Phone Ext.:

Mobile Phone: Business Email: [email protected]
Applicant’s Email: [email protected]

Page 46 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Registration Services:: Page 2 of 2
Workers’ Compensation
Professional Employer Organization (PEO)
Do you lease employees through Professional Employer Organization? No Workers’ Compensation Overview
Carrier: Hartford Casualty Insurance
Company
Inception Date: 10/23/2023
Policyholder Name: Breen Engineering, Inc. Expiration Date: October 23, 2024 Policy Number: 57 WEC AU4ZXD
Certification
Yes I certify that I do not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award Yes I certify that the contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works.

Yes I certify that one of the following is true: (1) I am licensed by the Contractors State License Board (CSLB) in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code; or (2) my business or trade is not subject to licensing by the CSLB.

I understand refunds are not authorized
I, Dace Dabols-Reimanis, the undersigned, am , Breen Engineering, Inc. with the authority to act for and on behalf of the above named contractor. I certify under penalty of perjury that all of the above information provided is true and correct. I further acknowledge that any untruthful information provided in this application could result in the certification being canceled.

I certify this on: 1:21 PM
Legal Entity Information
Legal Entity Type: Corporation
Name: Breen Engineering, Inc.

Page 47 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A : NAIC #
NAME: CONTACT
(A/C, No): FAX
E-MAIL ADDRESS:

PRODUCER
(A/C, No, Ext): PHONE

INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A

SUBR WVDADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOS ONLY AUTOS

NON-OWNED

OWNED SCHEDULED

ANY AUTO

AUTOMOBILE LIABILITY

Y / N WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT EROTH- STATUTE
PER
(MM/DD/YYYY) LIMITS POLICY EXP(MM/DD/YYYY) POLICY EFFLTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $ AGGREGATE $
$
OCCUR
CLAIMS-MADE DED RETENTION $
PRODUCTS - COMP/OP AGG $ GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $

DAMAGE TO RENTED
PREMISES (Ea occurrence) $ COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
10/20/2023
AssuredPartners Design Professionals Insurance Services, LLC 3697 Mt. Diablo Blvd Suite 230
Lafayette CA 94549
Dani Schulze 714-202-0390 [email protected] License#: 6003745 Travelers Casualty and Surety Co of America 31194 BREEENG-01 Travelers Property Casualty Company of America 25674 Hartford Casualty Insurance Company 29424 741837882 B X 2,000,000 X 1,000,000 X Contractual Liab 10,000 Included 2,000,000 4,000,000 X X 6806H232763 10/23/2023 10/23/2024
4,000,000
B 1,000,000 X
X X
BA2S55663A 10/23/2023 10/23/2024
C 57WECAU4ZXD 10/23/2023 10/23/2024
X
1,000,000 1,000,000 1,000,000
A Professional Liability 105354718 10/23/2023 10/23/2024 Per Claim Aggregate Limit
$2,000,000
$4,000,000
30 Day Notice of Cancellation
Proposal Certificate Only
CA
Breen Design Group, Inc.

Breen Engineering, Inc.
1983 W. 190th Street, Suite 200
Torrance CA 90504

Page 48 ends

Docusign Envelope ID: 8391F0FC-F048-4F8F-B9EA-C550CAB92448 Consultant Agreement with Cannon Corporation Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH CANNON CORPORATION
This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena, a municipal corporation (“City”) and Cannon Corporation, a CA Corporation (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management & Inspection

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 2
progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RFQ, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 3
and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 4
comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 5

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfinsured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 6
losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 7
recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 8

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 9
publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 10
based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer
To Consultant: Cannon Corporation
16842 Von Karman Ave, Ste 150
Irvine, CA 92606
Attn: Gary Solsona
Director of Public Infrastructure
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 11
that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 12
attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with Cannon Corporation Page 13
IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – Cannon Corporation
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 COO
Karen Morris
President
Michael Cannon
Exhibit A
Request for Qualifications (RFQ)
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

REQUEST FOR QUALIFICATIONS (RFQ)
FOR

GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION

MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,

ARCHITECTURE AND LANDSCAPE ARCHITECTURE,

GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL

TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:

MAY 2024
Memoranda:

Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.

City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124

TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A” Gardena Standard Professional Services Agreement…………….……………… 10 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 1 | Page

SECTION I

NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services NOTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on-call services related to our Public Works Capital Improvement Program and General Engineering. The work will be assigned on an as-needed basis for various projects in the City.

The Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.

The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/ Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217-9643 or [email protected].

BACKGROUND
The City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council-Manager form of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built-out, with a few remaining undeveloped parcels and a 9.4-acre wetland preserve, Gardena Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.

The Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.

The existing city-owned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City discharge to the LACSD interceptor at over 100 locations.

The existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).

The collection system pipes within the City primarily discharge to the Dominguez Channel.

Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.

The City has six (6) parks with community buildings, two gymnasiums, and a parkette. Additionally, the Gardena Wetland Preserve is situated next to Johnson Park. The City is currently constructing a new pool and senior center community center. Furthermore, the newly acquired Chase Bank Building on Rosecrans Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 2 | Page
Boulevard is slated to become a new Community Center, and Mas Fukai Park is in the construction document phase for improvements.

SUBMITTAL DEADLINE
Complete proposal/Statement of Qualification must be submitted no later than Thursday, June 13, 2024, at 2:00 p.m. PST. Three (3) hard copies and one complete PDF copy (on CD or memory stick) shall be address to:

City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, Assistant Public Works Director
The City currently anticipates conducting the selection process according to the following schedule, which is subject to revision. The City reserves the right to modify the schedule as needed.

May 9, 2024 RFQ Released
June 3, 2024 RFI Deadline
June 13, 2024 Proposal/SOQ Deadline
July 9, 2024 Staff Short List Selection
July 23, 2024 City Council Review/Approval
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 3 | Page

SECTION II

SCOPE OF SERVICES/SCOPE OF WORK
The City of Gardena would like the selected firms to provide professional on-call engineering, architecture, and/or landscape architecture services (including Construction Documents, PS&E, technical memoranda, research studies, plan checks, testing, etc.) for City projects to support the Public Works Department. The City intends to select between three and five (3-5) consultants for each respective service category, with the exception of only one or two consultants for Geotechnical Engineering/Geology/Material testing.

However, the actual number of consultants selected may be subject to change based on the number of responses and qualifications.

The award agreements are to provide on-call services for a period of three (3) years. The agreements may be renewed at the City’s discretion for up to two (2) additional years, subject to satisfactory performance during the initial three-year term. The initial three-year term is anticipated to commence in September 2024 and end in September 2027. The City encourages firms to submit qualifications for any or all parts of the key services listed below to be eligible for placement on the qualified on-call/as-needed list for each service category separately.

At the City’s discretion, selected firms will be assigned projects based on their qualifications in relation to the project(s) scope of work, or requested to submit a proposal, on an as-needed basis for various projects in the city. The City does not guarantee that successful firms will be provided with any projects.

MINIMUM QUALIFICATIONS
Only those consultants with verifiable experience related to the services requested in this solicitation will be considered during the evaluation process. Consultant staff assigned to execute the scope of services must have relevant experience in providing the necessary services as described in the scope. All personnel assigned to the work must possess appropriate certification or registration as required by state and local agencies.

SCOPE OF WORK
Selected firms will report to and operate under the direction of the City of Gardena Public Works staff to provide professional engineering, architecture, and/or landscape architecture services to the City. In general, the selected consultants will be expected to provide services and staffing for the following categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
Consultants may submit qualifications for one or more of the service categories requested; however, separate proposals and letter of transmittals must be submitted for each category.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 4 | Page

GENERAL CIVIL ENGINEERING DESIGN
Provide complete design services for Capital Improvement Program projects. Example services include, but not limited to:
• Plan preparation for street improvements, repair, rehabilitation, or other related street improvements.
• Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
• Preparation of hydrology and hydraulic analysis and reports. • Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. • Geotechnic engineering and material testing as needed. • Preparation of project technical provisions.
• Preparation of detailed cost estimates.
• Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. • Provide design and construction surveys.
• Provide construction assistance.
• Coordination with, and approvals from other permitting agencies and utility companies.

CONSTRUCTION MANAGEMENT AND INSPECTION
Provide complete construction management and inspection services for CIP, including park renovations, and facility construction/ modifications/ modernizations. Including, but not limited to:
• Coordinate and lead project construction meetings.
• Lead all meetings during the construction from pre-construction to final closeout. • Provide and maintain project files/documents per City template. • Provide and supervise construction observations/inspections for CIP projects such as streets, sewer, storm drain, parks and facilities.
• Provide construction inspection services in grading, street improvements, drainage, SWPPP/erosion control, paving, sewer, water, and franchise utilities. • Provide public contract administration (i.e. CCO, Daily logs/report, Weekley Statements, Notices, labor compliance/enforcement).
• Provide utility company coordination.
• Provide labor compliance/enforcement as needed.
• Assure contractor to maintain a set of as-built plans. • Schedule the final walk-through inspections and prepare a “punch-list”. • Collect and review the Certified Payrolls as needed.
• Assume contractor to obtain all necessary permits.
• Provide constructability review, quantity take-off and cost estimates as needed.

TRAFFIC ENGINEERING
Provide traffic design engineering and/or study/analysis services for signal and signing, striping, grant writing, and all related services, including but not limited to:
• Improvements associated with traffic signal design.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 5 | Page
• Preparation of signing, striping, signal modifications, detour, and traffic control design • Preparation of special traffic studies
• Conducting signal synchronization studies (before and after synchronization travel time), utilizing HCM method for LOS, as well as Los Angeles County standards.

ARCHITECTURE AND/OR LANDSCAPE ARCHITECTURE
Provide architecture and/or landscape architecture professionally services for public facilities. Including, but not limited to:
• Provide conceptual design, master plan, feasibilities study and envelope evaluations. • Renovation and/or expansion of existing public facilities. • Preparation of landscape/planting plans and irrigation. • Parking lot and hardscapes improvements.
• Playground layout and play structure design/upgrade.
• Preparation of project special provisions and technical specifications • Provide cost estimates.
• Provide constructability review and construction support.

GEOTECHNICAL ENGINEERING, GEOLOGY AND MATERIAL TESTING
Provide complete design, construction, or assistance services for City improvement projects and/or investigations. Services include, but are not limited to:
• Complete soils investigation and preparation of Geotechnical Engineering reports and studies, such as pavement design, grading requirements, retaining wall parameters, slope stability analysis, sinkhole/voids investigation and analysis, etc. • Laboratory work related to all aspects of Geotechnical Engineering. • Provide construction inspection for items such as asphalt concrete, aggregate base, and concrete placement during construction, grading excavation, and backfill. • Provide testing services such as field compaction and laboratory testing of soils, aggregates, asphalt, and concrete.

STAFF AUGMENTATION SERVICES (Firms may submit only for positions or service they provide.) Provide qualified and available personnel to provide professional staff augmentation services and/or backfill various positions and classifications within the Engineering Division on short notice. Positions include but are not limited to: Engineer(s), Permit Technician(s), and Inspector(s) and perform duties as an “Acting” City representative. Positions may require personnel reporting to City offices.

Immediately the City plans to augment one (1) Associate, Civil, or Senior Civil Engineer based on the qualification and best fit for the City. Other categories of augmentation services are not currently needed, however will be requested as needed.

Sample duties include, but not limited to:
• Engineer(s) general requirements (Identify an Engineer with resume and proposed classification; Associate, Civil, or Senior Civil Engineer) - Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 6 | Page
o Able to work minimum 20 hours per week or more. The City is open to accepting fulltime services as well. o Perform mathematical computations and estimates.
o Simultaneously handle several tasks and continue to reestablish priorities. o Communicate clearly and concisely with others, orally and in writing. o Ability to establish and maintain effective team relationships with all internal and external customers.
o Able to operate Microsoft Office and AutoCAD.
o Able to perform in indoor and outdoor environments with exposure to the elements. o May be required to pass a security/background check and a drug test prior before providing any services to the City.
o Must maintain a valid California Drive License.
o You may be required to work more than 40 hours a week and/or work irregular hours, particularly during emergency situations.
o Typical working hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. or 9/80 schedule from 7:30 a.m. to 5:30 p.m.
o Civil and Senior Engineer positions require a California Professional Civil Engineering license.
o May be required to arrange for the City to interview a candidate, at the Consultant’s expense, for a period of up to one (1) hour.

Typical Responsibilities – The staff will be under general direction of Engineering Division Manager, performing and overseeing various CIP projects from preliminary design to final construction. Examples of duties and responsibilities are as follow:
o Prepares RFP/RFQ for design and Construction Management and Inspection (CMI) services.
o Prepares and/or oversees design Plans, Specifications, & Estimates (PS&E). o Prepares and leads project bid processing, writes council agenda report, and executes contract.
o Oversees CMI services.
o Prepares Caltrans required submittals and coordinates review process (i.e. PES, E76 o and Contract award packages).
o Performs minor drafting, computing, and checking field operations as related to the layout and construction of pavement, curbs, gutters, sidewalk, traffic, utilities and other CIP.
o Performs LA Metro required project reporting, reimbursement process, etc. o Interprets and applies GREENBOOK, Caltrans Standards, City Standards, and other laws and regulations relating to CIP projects.
• Provide Permit Technicians to assist public at Engineering public counter (Not required to identify personnel at this time).
• Provide Construction Inspection services (Not required to identify personnel at this time), such as:
o CIP projects such as street rehabilitation; sewer or storm drain improvements, facility modifications and improvements; park rehabilitation and improvements. o Private development including paving, utilities, sewer, storm drains, paving, etc. o Repairs and improvements by private utility companies.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 7 | Page

SECTION III

SUBMITTAL REQUIREMENTS
The Proposal package shall be organized and presented in a neat and logical format relevant to the services requested. Submittals shall be clear, accurate, concise, and comprehensive. There is no page limitation, however, excessive, or irrelevant material will not be favorably received.

The Proposal should be in the order below and include the following:
• Cover
• Cover Letter
o Clearly indicate the on-call service category.
o Express why Consultant is interested in the RFQ.
o Include contact information for the person responsible for the Proposal and who will be the point of contract for the City.
o Include any unique attributes or distinguishing characteristics which would be of value to the City.
o State if any addendums have been received and include in the Proposal. o Statement regarding acceptance of Agreement and insurance requirements. o Letter shall be signed by an officer of the firm who is authorized to bind the firm to the contract. Include a statement to this effect.
• Firm Qualifications and Experience
o Describe firm’s background and experience.
o Describe your firm’s strengths.
o State how your firm produces deliverables free of errors and how you will address erros if they occur.
o Include experience and technical competence of subconsultants. o Familiarity of regional grants/competitive funds (SBCCOG & LA Metro) • Key Personnel and Experience
o Experience and history performing directly for local agencies within the last five years. o Include subconsultants if any.
• Organization Chart
• Similar Projects/Services
o Brief description of the project scope, personnel involved and their roles, plus agency and contact information of agency Project Manager/Engineer. o Projects that the firm was the prime consultant and responsible for management of any subconsultants.
• References
o Current contact information related to projects completed within the last five years. • Fee Schedule
• Resumes
Note: All licensed professionals in 'responsible charge' working on City projects (Engineers, Architects, Landscape Architects, and/or Surveyors) are required to disclose all disciplinary actions against them, including any future actions. Please provide a copy of any disciplinary actions with the proposal submission. Additionally, provide a statement if there are no disciplinary actions.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 8 | Page

SECTION IV

FEE SCHEDULE
A fee schedule should be included in the Proposal. This schedule should comprise a comprehensive list of positions and labor rates for all services provided by the prime consultant and all subconsultants. Rates should cover all necessary resources, including labor, equipment, materials, incidental reports, transportation, etc. Any percentage markup of subconsultant invoices shall be specified.

The fee schedule should remain fixed throughout the initial term of the Agreement unless formally amended by the City Council. Adjustment of the fee schedule can be negotiated if the City renews the Agreement.

The City is subject to prevailing wage laws, which apply to professional service providers and their subconsultants for whom the Department of Industrial Relations has established a wage determination.

This includes, but is not limited to, Field Soils Materials Testers, Operating Engineers, Surveyors, and Building/Construction and Specialty Inspectors.

Prevailing wage requirements apply when a Consultant and/or Consultant Team is awarded a contract for a specific project, which is designated by the issuance of a City Purchase Order.

SECTION V

SELECTION/EVALUATION CRITERIA
The Proposals will be evaluated by City of Gardena Public Works Department staff. The evaluation criteria will include:
• Presentation, completeness, clarity, organization, and conformance to the RFQ content. • Project Manager’s experience related to the City’s requirements and needs. • Familiarity/Experience related to the South Bay Cities Council of Governments (SBCCOG), Los Angeles County Metropolitan Transportation Authority (Metro), and Caltrans project programs, funding opportunities, grant writing, and their requirements. • Qualifications and resumes of staff members, subconsultants, and organization chart. • Similarity of the firm’s referenced projects completed within the last five years to the City’s expected projects.
• Availability and depth of staff and resources to deliver quality products on schedule, including work on short notice and under time constraints.
• References.
• Fee schedule.

During the evaluation period, the City may conduct negotiations with the most qualified consultants.

However, consultants should note that an award may be made without negotiations or discussions.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 9 | Page

SECTION VI

GENERAL CONDITIONS
By submitting a Proposal, the Consultant represents that they have thoroughly examined and become familiar with the requirements of this RFQ and are capable of performing quality work to achieve the objectives of the City.

The City reserves the right to withdraw the RFQ at any time without prior notice. The City makes no representations that any Agreement will be awarded to any Consultant responding to this RFQ. The City reserves the right to extend the deadline for Proposals, postpone reviewing the Proposals for its own convenience, reject any and all Proposals without indicating any reasons for such rejections, and negotiate with any qualified consultant. The City does not guarantee that successful firms will be provided with any projects.

The successful consultant(s) and sub-consultants are required to obtain and maintain a City of Gardena business license and insurance. The license and insurance shall be maintained for the duration of the Agreement. A current business license is not a prerequisite for submittal of the qualifications.

The City is not liable for any costs incurred by the Proposers before entering into a formal agreement.

Costs for developing the Proposal or any other such expenses incurred by the Proposer in responding to this RFQ and entirely the responsibility of the Proposer and shall not be reimbursed by the City.

The City is not responsible for Proposals which are delinquent, lost, incorrectly marked, sent to the wrong address, or sent by mail or courier service and not signed for by the City.

SECTION VII

AGREEMENT AND INSURANCE
The City’s standard Professional Services Agreement is included in Appendix A. The Consultant will be expected to enter into the Agreement without substantive changes. Any changes will require approval by the City Attorney. If there are any exceptions or if there are no exceptions, a statement to the effect shall be included in the proposal as well.

The City’s standard insurance requirements are included as part of the standard Professional Services Agreement included in Appendix A. The consultant shall procure and maintain throughout the duration of this Agreement.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 10 | Page

SECTION VIII
APPENDIX “A”
Gardena Standard Professional Services Agreement
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH XYZ
This Agreement is entered into this day of , 2024,
by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 3

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee proposal hereto and incorporated herein by reference. In no event shall compensation under this Agreement exceed _____________and 00/00 ($###.##) without the prior written authorization of the City Council.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 4
extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 5
shall be issued by an insurance company which is admitted to do business in the State of California.

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfDocusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 7
the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 8
paid by City for employer contribution and/or employee contributions for PERS benefits.

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 9
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 10
Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works
To Consultant: XYZ
Address
XXXX, CA #####
Attn: Name
Tittle
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 11
own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 12

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with XYZ Page 13
other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – XYZ
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 2024 City of Gardena RFQ On-Call Professional Services
JUNE 4, 2024

RFQ FOR ON-CALL PROFESSIONAL SERVICES
ADDENDUM 01
TO: ALL RFQ HOLDERS
ADDENDUM NO. 1, AS DESCRIBED BELOW, IS FOR THE USE OF CONSULTANTS SUBMITTING THE STATEMENT OF QUALIFICATIONS OR RESPONSES TO THE CITY’S REQUEST FOR QUALIFICATIONS. ALL

CONSULTANTS SHALL INDICATE ON THE STATEMENT/PROPOSAL COVER LETTER THAT THEY HAVE RECEIVED THIS ADDENDUM NO. 1.

QUESTIONS & RESPONSES:

1. In regard to the subject RFQ Scope of Work for General Civil Engineering Design as shown on page 4, can you please confirm if the City would like us to include Geotechnical services as part of the Civil component as stated, since there is also a separate RFQ category for Geotechnical service on page 5? No, please submit a separate statement of qualifications if your firm is interested in providing services in the category of Geotechnical Engineering, Geology, and Material Testing. This category is intended for direct geotechnical services for the City. For General Civil Engineering Design, it is expected that the lead consultant will team up with your desired geotechnical consultant or your own qualified staff as needed to provide complete PS&E construction documents.

2. Can firms be both a prime consultant and a sub-consultant to another team in the same or different service category?
Yes, firms can be both.

3. Will the City allow the usage of the City’s logo in the proposal materials? Yes, the City will allow the usage of the logo.

4. Can you specify how “Associate, Civil, and Senior Civil” Engineers are classified? Is it based on number of years of experience or other criteria?
You may reference the City of Gardena’s job specifications as your minimum guideline:
https://www.governmentjobs.com/careers/cityofgardena/classspecs. The specifications for the Senior Civil Engineer position have not been developed. Therefore, assume that the job responsibilities are similar to those of a Civil Engineer, but require a minimum of 8 years of experience, including managerial experience. As mentioned, these specifications are minimal guidelines and consultants are encouraged to propose additional qualifications or experience to provide a competitive proposal.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 2024 City of Gardena RFQ On-Call Professional Services

5. Can you please confirm if firms are able to just submit a proposal for the geotechnical engineering/geology and material testing services or require having a team with a construction management company in order to pursue this?
Yes, you may just submit a proposal/statement for the geotechnical/geology and material services.

6. Do you anticipate consultants to support and prepare grant applications? The City may request services under General Civil Engineering, Traffic Engineering, Architecture and/or Landscape Architecture as applicable.

7. You are requesting references in the Similar Projects/Services and the References sections. Can you please clarify what information you would like in each section since both sections are asking for client contact information?
The information can overlap; however, Similar Projects/Services should identify specific projects with scope descriptions, key personnel and their roles, project dates, etc., as mentioned in the RFQ. The Reference Section should identify the current contact agency, person, phone number, and email so the reviewer can perform the reference check if necessary.

END OF ADDENDUM 01
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Exhibit B
Statement of Qualifications (SOQ)
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Reliable Responsive Solutions
Proposal for
General Civil Engineering
On-Call Professional
Services
Gardena
City of
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Table of Contents
Section 1: Firm Qualifications and Experience ...............................5 Familiarity of regional grants/competitive funds ..................................................... 11 Section 2: Personnel and Experience..............................................12 Section 3: Organization Chart ........................................................... 14 Section 4: Similar Projects/Services................................................ 15 Section 5: References .......................................................................... 21 Section 6: Fee Schedule......................................................................22 Section 7: Resumes.............................................................................. 29 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
City of Gardena June 13, 2024
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, PE, Assistant Public Works Director
Subject: Statement of Qualifications for On-Call General Civil Engineering Design Services
Dear Mr. Kwak:

The City of Gardena (City) is seeking general civil engineering services on an as-needed basis to support the City’s Public Works Capital Improvement Program (CIP). Our interest in this RFQ stems from our history of delivering successful oncall projects for the City. Our goals align with the City’s mission to provide the highest quality of life, a safe and attractive environment, and a sound economic future for the community. We understand the dynamics associated with delivering on-call public agency projects and pride ourselves in listening to, and promptly addressing, our client’s needs, doing the job right the first time, and reducing the amount of time required by City staff. Cannon offers the following benefits in support of the City’s CIP, namely park and facility improvements, streets, sewer and stormwater improvements:

On-Call Engineering Experience
Cannon will provide in-house civil, water resource, construction management/ inspection, and surveying services. Throughout the past 48 years, Cannon has managed on-call contracts with public agencies using our standard best practices that are based on communication and responsiveness, specifically responding to emails, phone calls, and requests from our clients in a timely manner. Cannon has an outstanding record of delivering services on time and within budget. We will operate as an extension of City staff and will keep the City’s goals for projects at the forefront of our decision process.

Highly Qualified and Experienced Project Engineering Design Team Gary Solsona, PE, QSD, will serve as Principal-in-Charge/Contract Manager. He will be responsible for coordinating activities with the City, including committing the right resources to fit the City’s needs. Gary has been providing engineering and design services to many Southern California cities throughout his 22-year career. He understands the City’s project delivery process, standards, local environment and has developed good working relationships with the City, other local resource agencies, utilities, and permitting agencies. Marco Canta, PE, will serve as Project Manager and has over 21 years of professional consulting experience.

Mr. Canta has worked on various projects in public works, roadway, drainage, utilities, and site design throughout Southern California. We bring a robust and highly skilled team of engineers, construction managers, and survey professionals who specialize in relevant scope items, such as street improvements, roadway widening, ADA compliance and rehabilitation/reconstruction/preservation projects, mapping and legal descriptions for right-of-way acquisitions, construction staking and construction assistance.

Category: General Engineering
We will operate as
an extension of
City staff and will
keep the City’s
goals for projects
at the forefront
of our decision
process.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Subconsultants
We have selected stellar subconsultants with whom we have a long working relationship. Iteris will provide traffic engineering services, LOR Geotechnical Group, Inc. will provide geotechnical engineering services, BGB Design Group will provide landscape architecture and irrigation, AKAL Consulting will provide grant writing support and federal-aid E-76 processing, and Epic Land Solutions will provide right-of-way acquisition support.

Required Statements
• Cannon and its subconsultants have no disciplinary actions to disclose. • Cannon acknowledges the receipt and review of addendum one. • Cannon has reviewed the City’s sample agreement and insurance requirements and takes no exceptions.

We look forward to the opportunity to work with the City to achieve its goals and objectives. I, Gary Solsona, am available at the contact methods provided below should you require additional information or have any questions.

Sincerely,
Gary Solsona,* PE, QSD
Director of Public Infrastructure
16842 Von Karman Ave., Suite 150, Irvine, CA 92606
( 949.777.1580 📱 909.234.7857
* [email protected]
*Authorized representative to legally bind firm
Main Point of Contact
Gary Solsona, PE, QSD
Director of Public Infrastructure
16842 Von Karman Ave., Suite 150,
Irvine, CA 92606
( 949.777.1580
* [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 5
Firm Qualifications and Experience 1
Office Locations
Services for the City will be provided primarily from
our Irvine office with support from our other offices, if needed. Cannon office locations include the following:

Irvine
16842 Von Karman Ave.

Suite 150
Irvine, CA 92606
( 949.753.8111
Ventura
305 S Kalorama St.

Suite A
Ventura, CA 93001
( 805.503.4590
Los Angeles
11900 W Olympic Blvd.

Suite 530
Los Angeles, CA 90064
( 310.664.1166
San Luis Obispo
1050 Southwood Dr.

San Luis Obispo, CA 93401
( 805.544.7407
Experience Counts
Cannon offers relevant expertise in the following areas:

Pavement Rehabilitation
Intersection and Signal
Improvements
Grading and Drainage
ADA Compliance
Complete Streets
Reports, Studies, and
Hydraulic Analyses
Read more about our relevant experience on pages 15-19.

Contact Information
Principal-in-Charge /
Contract Manager
Gary Solsona, PE, QSD
As previously mentioned, Mr. Solsona
will be the main point of contact
for the City. He brings 22 years of
experience. From his work on Artesia
Blvd Arterial Improvements, 170th
Street Rehabilitation and Redondo
Beach Blvd Arterial Improvements, he is familiar with the City’s staff and standards.

Mr. Solsona can be reached at:
( 949.777.1580 * [email protected]
16842 Von Karman Ave., Suite 150
Irvine, CA 92606
As a full-service engineering, surveying, and construction management firm, we take pride in our ability to offer
clients a broad range of services. Our commitment to
providing clients Reliable Responsive Solutions, whether the project scope is expansive or more specialized, spans 48 years. We have worked with many cities, agencies,
school districts, and counties to make streets safer and more pedestrian and bicycle-friendly, maintain secure and dependable water systems, and construct buildings and
facilities that are structurally sound.

Our team of more than 135 professionals includes
registered civil, structural, electrical, and mechanical engineers; licensed land surveyors; automation and SCADA system specialists; and Caltrans certified construction managers and inspectors.

Cannon has strong experience in the preparation of
engineering documents for the phases of design and
construction including: conceptual design, preliminary
design, final engineering, construction support, and
construction documents. We have specialists in street
rehabilitation, drainage design, sewer design, and roadway design; water resources, hydrology and hydraulics; water utilities, sewer and dry utilities; resource coordination; and construction scheduling and inspections.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 6
Cannon’s Canons
Cannon has principles, otherwise known as Cannon’s “Canons,” that are simply how we do business.

Two to Four, Never More: While it is not always possible to be available by phone, we pledge to return voice, email, and text messages within four hours.

Think Ahead: We are proactive, preemptive, and prepared.

We keep clients informed and provide updates before they call looking for them.

Be Reliable: We communicate with our clients and
teammates what we are going to do and then get it done.

Stand on the Shoulders of Others: We strive
to improve our operations system by using templates,
procedures, and what has worked in the past.

FIRM STATISTICS
200+
years of design
experience
100+
cumulative years
of on-call contracts
professional
engineers
48 years in
40+
business
Since 1976, Cannon has been committed to providing engineering services. Our reputation is a direct result of our consistent attention to our clients’ needs. Eighty percent of our firm’s business is from repeat clients who trust in our integrity, as well as our professional competence. We have the expertise, experience, and capabilities to meet your needs as demonstrated in the qualifications and experience detailed in this proposal. However, the real proof of this expertise is found in what our past and current clients have to say:

David Gould, PE, District Engineer, Crescenta Valley Water District The projects that Cannon worked on for CVWD were on time and within budget. I have been pleased with the services provided by Cannon. I’ve found their personnel to be extremely thorough, diligent, and knowledgeable. I’d recommend their engineering consulting services without hesitation.

Chris Dejarme, PE, Senior Civil Engineer, City of Ventura I’ve found [Cannon’s] engineers to be extremely professional, diligent, and knowledgeable. I have been pleased with the services provided by Cannon and trust their knowledge and expertise in supporting Ventura with the City’s capital improvements.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 7
Producing Deliverables Free of Errors
Our firm consistently meets project schedules and controls costs through planning, advanced project management tools, and rigorous cost estimation processes. With a 95% on-time completion rate and an average cost variance of less than 5%, we utilize the Deltek Vision Management System for detailed accounting and project management, enabling precise tracking of labor, subconsultant, and direct costs. This system supports Earned Value Analysis (EVA) for regular comparisons of actual costs to planned costs and completed work.

Our cost control management includes tracking project costs, managing Contract Change Orders (CCO), generating detailed monthly pay estimates, and confirming clear documentation and measurement of item work before payment.

Our engineer’s estimates are typically within -15% to +15% during the detailed design phase, validated by parametric risk models and aligned with industry best practices. This comprehensive approach confirms efficient project management and cost control, considering previous projects, inflation, and factors contributing to the final cost.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 8
Cannon’s Subconsultants
Iteris, Inc. (Iteris) is the market leader in smart mobility infrastructure management since 1987. Iteris’ 460+ staff have decades of expertise in traffic management, along with superior services and patented products that help detect, measure, and manage traffic and vehicular performance, minimize traffic congestion, enhance safety, and empower Iteris clients with solutions to better manage their transportation networks.

Iteris team members are experts in the fields of transportation planning, traffic engineering, and ITS. Knowledge of these practice areas enables Iteris to provide comprehensive services ranging from initial traffic impact studies, transportation modeling, planning, systems engineering, and detailed design, through implementation and performance measurement/ monitoring. Iteris combines the knowledge of transportation engineers, systems engineers, system integrators, software engineers, and transportation planners to offer an unmatched combination of talent and experience. Iteris combines the knowledge of transportation engineers, systems engineers, system integrators, software engineers, and transportation planners to offer an unmatched combination of talent and experience. This allows your team’s design to be informed by a hands-on integration experience of robust network communication systems.

Firm Information:
• DIR number: 1000014053
• Type of organization: Publicly Traded Corporation
(NASDAQ: ITI)
• Firm size: 460+
• Services offered: Transportation planning, traffic
engineering, and ITS
Firm Address:
• 1700 Carnegie Avenue,
Suite 100, Santa Ana, CA
92705
Relevant Projects with Cannon:
• Artesia Boulevard Arterial Improvement Project, City of Gardena
• Redondo Beach Blvd Arterial Improvement Project,
City of Gardena
• Lakeview Avenue Improvement Project, Phase II, City
of Yorba Linda
• PS&E Services for CIP 2018-11 ATP Cycle IV, City of
Huntington Park
Epic Land Solutions, Inc. (EPIC) is a full-service real property and right-of-way services consultant whose purpose is to plan, acquire, and manage real property interests needed to construct and maintain infrastructure facilities. For over 24 years, EPIC has performed right-of-way acquisition services for local public agencies, utilities, design engineers, and environmental companies across Southern California.

With 60 staff employed firm-wide, EPIC manages projects locally from regional offices in Los Angeles, Riverside, and San Diego. EPIC is unique among right-of-way consultants by employing real estate appraisers, GIS analysts, and a dedicated utility coordination team in-house to provide maximized real estate intelligence and limited third party involvement.

EPIC helps clients understand and abide by local, state, and federal regulations that guide the entire right-of-way process, including the federal Uniform Relocation Assistance and Real Property Acquisition Act of 1970 (URA) and Uniform Standards of Professional Appraisal Practice (USPAP).

History Working with Local Agencies
EPIC has provided on-call real estate consulting services for various municipalities and public agencies throughout Southern California, including Los Angeles County. As an experienced on-call consultant, we are eager to support the City of Gardena with as needed right-of-way services. EPIC is currently performing on-call right of way services for the Cities of Montclair, Inglewood, Anaheim, Riverside, Murrieta, Santa Ana, and the City of Irvine, to name a few.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 9
Cannon’s Subconsultants
LOR Geotechnical Group, Inc. (LOR), is a Certified Small business (SBE) and a multi-disciplined geotechnical engineering and consulting firm providing sound solutions and innovative strategies in the geotechnical engineering, geologic, environmental, and special inspection fields for clients since 1988.

LOR provides a comprehensive organization of qualified personnel to support the technical needs of this project. This firm has provided geotechnical engineering services for over three thousand projects within southern California.

LOR’s laboratory is currently approved by the California Department of Transportation (Caltrans). LOR’s field and laboratory personnel are Caltrans, International Code Council (ICC), American Concrete Institute (ACI), and American Construction Institute Association (ACIA) certified.

Firm Information:
• DIR number: 1000047292
• Type of organization: Soils Engineering
• Firm size: 12
• Services offered: Geotechnical
• Number of projects with Cannon: 200+
Relevant Projects with Cannon:
• Report Reviews for the Cities of Fullerton, Santa Ana, and Chino California.
• Pavement Design, Vermont Street Rehab, City of
Gardena, California
Firm Address:
6121 Quail Valley Court, Riverside, CA 92507
BGB Design Group (BGB) a Costa Mesa based landscape
architectural/planning firm incorporated in 1999, has collaborated on the following projects with Cannon Corporation, Artesia Blvd., Manhattan Beach Blvd., Gibson Mariposa Skate Park, Redondo Beach Blvd. Additional Public works projects include the University Drive Widening Project for the City of Irvine, Esplanade Avenue Streetscape Improvements (APWA Award 2011) and Redondo Beach Pier resurfacing project for the City of Redondo Beach, Kern River Upland and River Edge Restoration project for the City of Bakersfield, the Yorba Linda Town Center and the Crystal Cove for the Crystal Cove Conservatory, Coast Highway, Jamboree Medians and currently Newport Blvd. Streetscape for the City of Newport Beach. As evidence of its capabilities, BGB was awarded the American Society of Landscape Architects Centennial Medallion Award in 1999 for Avalon’s Waterfront Redevelopment Design and Plan; the extent of which stretched the length of the Crescent from the Catalina ferry docks to the Casino. Additionally, BGB was awarded an APWA and ASLA Merit award for the Railroad Corridor Pedestrian Beach Trail Project that extends the length of the City of San Clemente. BGB has been retained by the cities of Anaheim, Fullerton, Gardena, Newport Beach, and Rancho Santa Margarita as “on-call” landscape architects.

Firm Information:
• DIR number: 1000020720
• Type of organization: S Corporation
• Firm size: 7
• Services offered: Landscape architecture and irrigation Diversity Certifications:
• SB (Micro) #1156782
Firm Address:
• 3185 – C1 Airway
Avenue, Costa Mesa, CA
92626
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 10
Cannon’s Subconsultants
AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Their team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed their clients’ expectations.

Below is a partial list of professional services offered to the Public Agencies. • Prepare project funding applications for Local, State-aid and Federal-aid program projects • Prepare federal-aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
• Prepare environmental “PES” forms for federal-aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
• Prepare Initial Site Assessment (ISA) reports
• Prepare Right-of-Way (ROW) Certifications
• Prepare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
• Prepare Quality Assurance Program (QAP) in compliance with Caltrans requirements • Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects • Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right-of-way, and construction phases • Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures • Construction administration/management and project closing • Assist Agencies with project audits
AKAL Consultants Project Services
onsultants (dba of AAHK, Inc – a California Corporation) rief Description of Available Professional Services
ides services to Public Agencies and Private Sector in project planning; project structural design of public works projects; construction management; and am consists of experienced professional engineers, planners and consultants n providing quality professional services that meet or exceed our clients’ list of professional services offered to the Public Agencies. ect funding applications for Local, State-aid and Federal-aid program projects eral-aid E76 fund obligation packages and coordinate review and approval Caltrans and FHWA
ironmental "PES" forms for federal-aid projects, coordinate environmental roval process with Caltrans and FHWA
al Site Assessment (ISA) reports
ht-of-Way (ROW) Certifications
E paperwork (Annual Submittals, implementation agreements, establish project E goals), prepare annual ADA Certifications
lity Assurance Program (QAP) in compliance with Caltrans requirements ntract Award Packages” for Federal-aid and State-aid projects gress and final reimbursement requests for Federal, State and Local Measure ects
C Vote Allocation packages for STIP funded projects
l closing reports for Grant funded projects
agement and coordination services for planning, design, right-of-way, and phases
permit process with Caltrans and other regulating agencies uctural design of public works projects including retaining walls and special n administration/management and project closing
cies with project audits
rovided at a fixed price or on a “time and material” basis. AKAL Consultants ficient ways to do business and successful completion of our clients’ projects. s
P.E.

cox.net
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 11
Familiarity of Regional Grants / Competitive Funds
Cannon’s approach to grant funding reflects a comprehensive understanding of the funding landscape, focusing on providing the technical support necessary to help projects remain compliant with the funder’s requirements and avoid claw-backs. Additionally, Cannon can enhance the grant application process by providing technical analyses that significantly improve the quality of grant proposals. We have produced a variety of technical studies that can strengthen the impact and competitiveness of many grant proposals, making them more persuasive and increasing their chances of success in competitive funding situations.

The following table provides a summary of our firm’s successful history of grant applications. Summary of Funding Administration Project Experience Cannon www.cannoncorp.us
Federal State CDBG FEMA
City of Paso Robles Theatre Drive Realignment ARRA $2.86 million In Progress Construction, Close-Out Miscellaneous Projects, 1998, 2000, 2002 STIP STIP various 1998-2002 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Dinosaur Caves Park Street Improvements STIP $163,000.00 2003 Authorization ITS Projects ITS $180,000.00 2005 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Promenade IV HPP

TE STIP-TE
$1.2 million 2007 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Beachcomber Stairs LWCF $210,000.00 2009 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Fourth Street Improvement STIP $473,000.00 2009 Close-Out Promenade IVB ARRA

HPP STIP-TE
$1.6 million 2011 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Price Canyon Road Improvements TEA $213,000.00 2006 Authorization, PS&E Certification, Award Package El Moro Bikeway TEA $219,996.00 2006 Award Package
Santa Ysabel Improvements - Los Osos TEA $229,443.00 2006 Authorization, PS&E Certification, Award Package San Miguel Streetscape TEA $280,000.00 2006 Authorization, PS&E Certification Main Street (Cambria) Improvement Project TEA $243,457.00 2005 Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Price Canyon Road Improvements HPP

HBP STIP
$4.1 million 2010 Authorization
Willow Road Extension / 101 Interchange SLPP $2 million 2010 Application, Authorization Hutton Road Improvements HSIP $531,000.00 2011 Authorization, Design, Environmental, Right of Way, Bidding/Award Lopez Drive Bridge HBP $160,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction Mgmt, Close-Out
Atascadero Lake Park Walkway TEA $169,000.00 2003 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Garcia Road Bridge HBP $794,645.00 2003 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Santa Ysabel Road Rehabilitation STIP $318,000.00 2003 Authorization, Construction, Grant Reimbursements, Close-Out Santa Cruz Road Rehabilitation STIP $264,000.00 2003 Grant Reimbursements, Close-Out El Camino Real Traffic Signals ITS STIP $384,000.00 2003 Close-Out El Camino Real Enhancement STIP $298,000.00 2004 Grant Reimbursements, Close-Out La Linia Street Rehabilitation CDBG $200,000.00 2004 Design, Bidding/Award, Construction Los Osos Road Culvert Replacement CDBG n/a 2005 Permits Atascadero Lake Park Restroom Replacement CDBG $215,662.00 2006 Design, Bidding/Award, Construction Atascadero Creek Bank Restoration n/a 2006 Contract Administration Lewis Avenue Bridge TCSP $220,000.00 2008 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, San Gabriel Road - Safe Route to Schools (SRTS) SR2S $383,400.00 2010 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, City of Grover Beach W. Grand Avenue STIP-TE $600,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction Mgmt, Grant Reimbursements, Close-Out
City of Guadalupe Guadalupe Street (Route 1) HPP $351,814.00 2012 Authorization, Design, Bidding/Award, Construction, Grant Reimbursements, Close-Out Highway 1 Corridor Coastal Management Plan NSB $24,000.00 2011 Authorization, Close-Out, Contract Administration Highway 1 Corridor Gateway Monuments NSB $304,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out Highway 1 Corridor Interpretive Signs NSB $312,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out Highway 1 Coastal Trail Plan NSB $350,000.00 2012 Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out California Polytechnic Gilardi Road Bridge Replacement HBP $717,093.00 In Progress Application, Authorization, Close-Out Cuesta Community
College
Hollister Road Bridge Replacement HBP Cal EMA $3.4 million 2011 Construction, Grant Reimbursements, Close-Out Federal - FHWA:

City of Pismo Beach
Timeline (year
completed)
Agency Project Funding Source(s) Grant Phase In Which Services Were Provided Amount
TE = Transportation Enhancement
San Luis Obispo
Council of
Governments
LWCF = Land and Water Conservation
CDBG = Community Development Block
County of San Luis
Obispo
City of Atascadero
HPP = High Priority Projects
HSIP = Highway Safety Improvement Program
SRTS = Safe Routes to School (Federal)
ARRA = American Recovery and Reinvestment Act
ER = Emergency Relief
California Transportation Commission:

SLPP = State and Local Partnership Program
STIP = State Transportation Improvement Program
EEM = Environmental Enhancement Mitigation
SR2S = Safe Routes to School (State)
STIP = State Transportation Improvement Program
TCSP = Transportation & Community &
NSB = National Scenic Byways
ITS = Intelligent Transportation Systems
HBP = Highway Bridge Program
Prop 1B = State-Local Partnership Program
State of California:

Page 1 of 1 ends

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 12
Personnel and Experience 2
Experience Working with Public Agencies / Authorities
Cannon has had the opportunity to build professional relationships with many cities, counties, and local agency representatives throughout California. The following select list presents a summary of the municipal entities we have worked with recently:
• City of Gardena
• City of Los Angeles
• County of Los Angeles
Department of Public Works
• Los Angeles Community College
District
• Port of Long Beach
• City of Glendale
• City of Diamond Bar
• City of Manhattan Beach
• City of Irvine
• Irvine Ranch Water District
• City of Anaheim
• City of Santa Ana
• City of Fullerton
• City of Lake Forest
• City of Garden Grove
• City of Huntington Park
• Santa Clarita Water District
• Newhall County Water District
• City of South Pasadena
• City of Santa Fe Springs
• City of Redondo Beach
• City of Rancho Palos Verdes
• City of Pomona
• City of Pico Rivera
• City of Santa Monica
• City of El Monte
• City of Menifee
• City of Moreno Valley
• County of Riverside EDA
• County of San Bernardino
• City of Chino
• City of Arroyo Grande
• City of Atascadero
• City of Bakersfield
• City of Beverly Hills
• City of Buellton
• City of Carpinteria
• City of Delano
• City of Goleta
• City of Gonzales
• City of Grover Beach
• City of Guadalupe
• City of Hemet
• City of Lancaster
• City of Lompoc
• City of Lynwood
• City of McFarland
• City of Monterey
• City of Morro Bay
• City of Paso Robles
• City of Pismo Beach
• City of Salinas
• City of San Luis Obispo
• City of Santa Maria
• City of Simi Valley
• City of Soledad
• City of Solvang
• City of Ventura
• City of Vernon
• County of San Luis Obispo
• County of Kern
• County of Santa Barbara
• Orange County Public Works
• Santa Ynez Community Services
District
• Nipomo Community Services
District
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 13
Project
Spotlight Matrix
Project Name
Services Provided
Drainage DesignGrading DesignRoadway DesignADA Design and AssessmentWater Quality / SWPPPTechnical SpecificationsEngineer’s Cost Estimates Artesia Blvd. Arterial Improvements,
Gardena, California
    
Rowley Park Restroom project
Gardena, California
  
170th Street Improvements,
Gardena, California
     
Redondo Beach Blvd Arterial Improvements,
Redondo Beach California
    
Rio Vista Street Pavement Rehabilitation,
Anaheim, California
      
Cerritos Avenue Sidewalk Gap Closure,
Anaheim, California
     
Modjeska Park Storm Water Detention,
Anaheim, California
     
Jamboree Main Intersection Improvements,
Irvine, California
      
San Juan Street Reconstruction,
Fullerton, California
    
Concrete Pavement Reconstruction,
Newport Beach, California
      
Lakeview Avenue Widening,
Yorba Linda, California
      
Pedestrian Access Curb Ramps,
Long Beach, California
    
ADA Ramp Improvements,
Lake Forest, California
   
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 14
Organization Chart 3
Organizational Chart
We have selected key staff who are not only experts in their respective disciplines but also have extensive experience collaborating on similar projects. This high level of expertise has allowed our team to fine-tune our collaboration and coordination, contributing to the successful completion of projects that are on time and within budget. Our team will be led by Gary Solsona, PE, QSD, as Principal-in-Charge and Contract Manager. 🔑 Key Personnel
*Subconsultant City of Gardena
Principal-in-Charge /
Contract Manager
Main point of contact
🔑 Gary Solsona, PE, QSD
QA / QC Manager
Larry Kraemer, PE

GEOTECHNICAL TRAFFIC LANDSCAPE

ARCHITECT
🔑 John Leuer,
GE, CE
*LOR
🔑 Paul Frislie

PE, IMSA
*Iteris
🔑 Arthur Guy,

ASLA, CLIA
*BGB

FUNDING

SPECIALIST

RIGHT-OF-WAY

ACQUISITIONS
🔑 Kanwal Singh, PE
*AKAL
🔑 Addiel Flores, RWA
*Epic Land Solutions

CIVIL DESIGN
🔑 Gary Solsona, PE, QSD
🔑 Marco Canta, PE
Anthony Severy PE
Andy Rowe, PE
John Evans, PE
Karena Diep, EIT
Kaitlin Grabiec, EIT
Foster Campbell, EIT
Ally Marnocha, EIT
Nick Settevendemie, EIT
Cannon
130+ support staff

WATER RESOURCES
🔑 Mike Kielborn, PE, LEED AP
Gary Roepke, PE
Tina Kuah, PE

CM & INSPECTION
🔑 Patrick Riddell, PE,

CPII, QSD/P
Matt Natividad, CPII

SURVEYING
Ned Reynolds, PLS
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 15
Similar Projects/Services 4
City of Gardena, California
Artesia Boulevard Arterial Improvements
The City of Gardena (City) wanted to replace existing medians along Artesia Boulevard, from Western Avenue to Vermont Avenue, with a new decorative hardscape paving solution. Based on prior discussions with City staff, the Cannon team (including our subconsultant, BGB) evaluated and presented four paving solutions to the City: 1. grouted river cobble;

2. exposed concrete; 3. concrete unit pavers; and 4. staining/sealing the existing stamped concrete. The City subsequently decided to move forward with the cobblestone paving solution, which Cannon incorporated into the final design plans, specifications, and cost estimate.

Our team prepared a design study (exhibit) to convey the proposed limits of added or deducted hardscape for City direction. Following approval of the conceptual design direction, we completed revisions to the previously submitted 95% design plans, specifications and estimate (PS&E). This consisted of the street improvement plans and landscape demolition plan, irrigation plan, planting plan, technical specifications, and cost estimate. • Cannon’s Subconsultant: BGB
170th Street Improvements
Cannon successfully completed the 170th Street Improvement Project in Gardena, spanning 0.50 miles from Normandie Avenue to Vermont Avenue.

Funded partly by $500,000 from the Federal Surface Transportation Program, the project focused on enhancing street drivability and aesthetics.

Key accomplishments included rehabilitating asphalt concrete pavement, repairing concrete curbs and sidewalks, upgrading curb ramps to ADA standards, and installing a traffic signal system battery backup at a major intersection. Cannon’s role encompassed preparing construction plans, specifications, cost estimates, and handling the E-76 Authorization documentation, culminating in a project that met the City of Gardena’s safety and accessibility standards. This project included a geotechnical subconsultant that Cannon managed.
• Funded partly by Federal Surface Transportation Program Reference: William Mendoza
Associate Engineer
City of Gardena
1717 West 162nd Street
Gardena, CA 90247
 310.217.9676
[email protected]
Project Dates: March 2019 - June
2024
Key Project Team Members
• Gary Solsona, PE, QSD Project Manager
• Karena Diep, EIT Design Engineer
• Paul Frislie,PE (Iteris), Traffic Engineer
• Art Guy (BGB), Landscape Architect
Key Project Team Members
• Gary Solsona, PE, QSD Project Manager
• Karena Diep, EIT Design Engineer
• Kanwal Singh (AKAL), Federal E-76 Processing
Project Dates: March 2019 -
December 2022
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 16
City of Gardena, California
Redondo Beach Boulevard Arterial Improvements
The City of Gardena Public Works Department (City) retained the professional engineering services of Cannon to provide PS&E design services for the Redondo Beach Blvd Arterial Improvements Project from Crenshaw Blvd. to Vermont Ave., approximately 1.9 miles in length. The project improvements propose to improve safety, access, and corridor traffic operations by modifying the existing raised medians and installing new raised medians to replace the existing two-way left turn medians, extend left turn pockets, and improve traffic channelization. Other components related to the design of the corridor include pavement reconstruction / rehabilitation, addition of bulb-outs (which require evaluating existing drainage systems), upgrading existing curb ramps to ADA compliance, upgrades to the traffic signal system.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 17
City of Fullerton, California
San Juan Street Reconstruction Project
The City of Fullerton needed to complete street, water, and sewer improvements along seven streets within the San Juan Community.

Improvements consisted of pavement reconstruction via full depth reclamation with cement; reconstruction of raised median (due to upheaving of tree roots); repair of broken/damaged portland cement concrete curb and gutter (rolled and standard); cross-gutters and driveway aprons; replacement and upsizing of existing water mains to 8” PVC; reconnecting existing water services; and removal and replacement of the existing 8” VCP sewer main.

Cannon provided civil engineering design services for plans, specifications, and estimate (PS&E) construction documents. The Cannon Team also provided topographic survey, geotechnical investigation, utility coordination, utility potholing services, and pre- and post-construction monumentation preservation services for the project. Survey services included topographic survey, cross sections, right-of-way establishment, construction staking, and monument perpetuation for one mile of residential streets.

Rancho-Verona Water Main Replacement
Cannon was selected to provide civil design to replace outdated 6” and 8” cast iron water mains in the Rancho Verona area, prior to performing street repairs. The need to replace the selected water mains resulted from age, condition, and capacity deficiencies of the existing water mains. The new pipeline provides a more reliable water supply to the community and better pressure and fire flow for the area. The length of the water mains replaced was 5,583 feet. The design included a new water main to be installed adjacent to existing water mains, and the old water mains to be abandoned once service laterals are tied over to the new line.
• Project Dates: November 2022 - September 2023
Euclid and Rosecrans Water Main Rehabilitation
To prevent trenching on new pavement, the City of Fullerton is replacing water mains near Euclid Street and Rosecrans Avenue ahead of a nearby development, with the Developer repaving affected streets. This includes upgrading 8-inch and 12-inch pipes with C900 PVC and rehabilitating a 24- inch main using trenchless CIPP technology, enhancing water supply and fire safety over 3,090 feet of new mains and 930 feet of rehabilitated mains. • Project design completed: December 2023
Reference: David Grantham, PE
Principal Civil Engineer
City of Fullerton
303 W. Commonwealth Ave
Fullerton, CA 92832
( 714.738.6853
* david.grantham@
cityoffullerton.com
Project Dates: January 2018 -
December 2021
Key Project Team Members
• Gary Solsona, PE, QSD Project Manager
• Mike Kielborn, PE, Civil Engineer
Key Project Team Members
• Mike Kielborn, PE, Project Manager
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 18
City of Anaheim, California
Modjeska Park Underground Storm Water Detention
and Infiltration System
Modjeska Park is an award-winning project that spans a 23.5-acre park in Anaheim, California. The City of Anaheim selected Cannon to engineer a solution to a multi-faceted problem. Extensive flooding caused by an under-sized storm drain line prompted an urgent local need for stormwater management. As part of Orange County’s larger Storm Water Resource Plan, the objectives were to protect and enhance regional water quality, manage stormwater runoff, and increase local water supply.

The project involved installing an underground, pre-manufactured infiltration/ detention system; two laterals to divert dry weather flow and stormwater; and a stormwater diversion structure to divert flows from an existing 48-inch reinforced concrete storm drainpipe that drains the 224-acre contributing watershed. The system was designed to capture and infiltrate a minimum of 150 acre-feet per year of dry weather, urban runoff, and first flush of storm water to reduce pollutant discharge to the Bolsa Chica Channel.

Cerritos Avenue Sidewalk Gap Closure
Cannon provided civil engineering design, including plans, specifications, and estimates (PS&E), and survey services for this project located on Cerritos Avenue from Euclid Street to approximately 600 feet east of Euclid Street. The project consisted of constructing a five-foot wide, ADA compliant sidewalk adjoining the back of curb, with no parkway along the north and south sides. The work also included the construction of block walls and fences that were relocated and reconstructed as part of the project. The new sidewalk eliminated the need for pedestrians to walk along the side of the road or on a dirt path.

Cerritos was designed as a four-lane secondary arterial by the County’s Master Plan of Arterial Highways (MPAH) with average daily traffic of 9,400 vehicles per day. The sidewalk along Cerritos east of Euclid Street ended abruptly. The existing pathway consisted of an unpaved dirt path. The sudden sidewalk gap was a challenge for the drivers, pedestrians, bicyclists, and students of Loara High School located on the northwest corner of the Euclid and Cerritos. This sidewalk project provides enhanced safety and improved access for the school children and pedestrians in general. Cannon’s services included right-of-way acquisition and Phase I ESA.

Reference: Bill Grigsby, PE
Principal Civil Engineer
City of Anaheim
200 South Anaheim Blvd., Ste. 276,
Anaheim, CA 92805
( 714.765.5259
* [email protected]
2020 SoCal Project of
the Year
2020 Water Project
of the Year, Orange
County Branch
Key Project Team Members
• Gary Solsona, PE, QSD Project Manager
• Anthony Severy, PE Civil Engineer
Key Project Team Members
• Gary Solsona, PE, QSD Project Manager
Project Dates: March 2021 -
November 2021
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 19
City of Irvine, California
Jamboree Main Intersection Improvement
Strategically located in the heart of southern California, between Los Angeles and San Diego, Irvine is surrounded by major freeways. It holds more than 26,000 business licenses, Irvine delivers the benefits of connectedness, proximity, and customer accessibility. To continue to provide the necessary traffic flow, this project was designed to improve the intersection of Jamboree Road and Main Street to mitigate the future deficient level of service (LOS) by adding a fifth northbound and a fifth southbound lane on Jamboree Road, between the I-405 northbound on/off ramps and Kelvin Avenue. The improvements were designed to meet current City, State, and Federal standards.

Due to right-of-way constraints, sidewalk widths north of Main Street were less than recommended by the IBC Vision Plan design guidelines (IBC recommends an 8’ parkway and 8’ sidewalk width, proposed improvements are no parkway and 6’ to 8’ sidewalk widths). Any non-standard features required approval by the City’s Planning Department during final design.

This project included professional engineering services for the preparation of construction contract documents, including the following:
• Street improvement plan and
profile
• ADA sidewalk and curb ramp
design
• Storm drain and flood control
channel modifications
• Right-of-way engineering
(title reports, mapping & legal
descriptions, ROW acquisition
maps)
• Retaining wall plan / profile
• Earthwork grading plans
• Landscape planting / irrigation
plans
• Construction details
• Traffic signal modification
• Striping / signing plans
• Traffic stage construction plans
• Wet and dry utility coordination /
mapping
• Hydrology and hydraulics
• WQMP / SWPPP
• IRWD water facility design
• Environmental compliance and
water quality documentation
• Specifications and construction
cost estimates
Year Completed: October 2019
Reference: Steve Sherwood, PE
Assistant City Engineer
City of Irvine
One Civic Center Plaza, Irvine,
CA 92623
 949.724.7327
[email protected]
Key Project Team Members
• Gary Solsona, PE, QSD Project Manager
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 20
Quality Assurance/Quality Control Process
Cannon is committed to providing the City with the best possible product, on schedule and within budget. To accomplish this, we use a Quality Assurance/ Quality Control (QA/QC) Program that is organized to accommodate the specific needs and requirements of each task order. Our QA/QC manager for this contract is Mr. Larry Kraemer, PE. Cannon’s QA/QC program is generally divided into three phases:

1. Design Team Review. This review is provided by members of the project team as the work progresses. Prior to the start of design work, an analysis is made to determine the technical requirements, needs, and requirements of the Client; jurisdictional requirements; and fiscal constraints or schedule requirements of the project. At this time, specific quality control requirements and internal review procedures are established.

2. Independent Peer Review. This review is conducted at various project phases preliminary, 60%, and 100% by design personnel who are outside of the regular project design team. Peer review consists of a detailed review of project work products. This process involves the assignment of senior personnel, including principals, to provide detailed, independent reviews of the work being completed. The selection of senior personnel for this task is based on professional expertise, specific knowledge of similar projects, and years of experience. The detail reviewer’s responsibility will include: evaluation of the overall project concept at preliminary phase; verification of the adequacy of the design to achieve the project goals; evaluation of possible design alternatives; review of QA/QC by the design team; review of the project for constructability; and contractor review. Recommendations made by the independent reviewer are made directly to the project manager, who is responsible for evaluating the recommendations and implementing changes, as required. The reviewer’s comments will be documented and recorded along with the designer and project manager’s response to comments.

3. Review of Subconsultant Deliverables: This review is conducted by Cannon’s project manager because of their knowledge of the entire project’s scope and how each discipline relates to each other. This review is also conducted at various project phases, including the preliminary, 60%, and 100% and will be done prior to submitting the complete deliverable to the City. This review includes: evaluation of the overall project concept at preliminary phase; verification of the adequacy of the design to achieve the project goals; evaluation of possible design alternatives; and review of the project for constructability. After receipt of review comments, the subconsultant incorporates the comments or provides justification for a different design direction. The subconsultant then provides revised plans to the project manager along with the original comments and proper responses that follows our QA/ QC plan format.

Accurate Coordination of Subconsultants
Cannon has extensive experience in accurately coordinating subconsultants, having worked with 100+ firms. From project onset, each subconsultant is integrated into our Quality Assurance/Quality Control (QA/QC) process making them fully vested and accountable members of the Cannon Team. Regular coordination meetings and a comprehensive project management system help us maintain alignment and address issues promptly, resulting in seamless project execution. Cannon’s QA/QC Process is detailed below.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 21
References 5
Reference: David Grantham, PE
Principal Civil Engineer
City of Fullerton
303 W. Commonwealth Ave
Fullerton, CA 92832
( 714.738.6853
* [email protected]
Reference: Bill Grigsby, PE
Principal Civil Engineer
City of Anaheim
200 South Anaheim Blvd., Ste. 276
Anaheim, CA 92805
( 714.765.5259
* [email protected]
Reference: Steve Sherwood, PE
Assistant City Engineer
City of Irvine
One Civic Center Plaza
Irvine, CA 92623
 949.724.7327
[email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 22
Fee Schedule 6
2024/2025 Fee Schedule
Bill Rate Ranges
Subject to change
Assistant Resident Engineer I - II $ 155 - $ 205 Project Designer $ 125 - $ 179 Associate Engineer $ 180 - $ 240 Project Engineer $ 153 - $ 205 Associate Land Surveyor $ 210 - $ 230 Resident Engineer $ 195 - $ 248 Associate Landscape Architect $ 175 - $ 215 Sr. Associate Architect $ 219 - $ 260 Automation Specialist $ 165 - $ 210 Sr. Associate Engineer $ 180 - $ 265 Automation Technician $ 130 - $ 165 Sr. Automation Specialist $ 185 - $ 225 CAD Tech $ 115 - $ 140 Sr. Automation Technician $ 150 - $ 185 CAD Manager $ 130 - $ 165 Sr. CAD Tech $ 130 - $ 160
Construction Coordinator I - II $ 125 - $ 160 Sr. Construction Manager $ 217 - $ 323 Construction Inspector I - III $ 120 - $ 200 Sr. Consultant / Principal-in-Charge $ 285 - $ 385 Construction Manager $ 178 - $ 235 Sr. Land Surveyor $ 230 - $ 275 Design Engineer $ 150 - $ 195 Sr. Landscape Architect $ 190 - $ 230 Director/ Department Manager $ 225 - $ 310 Sr. Plan Check Engineer $ 175 - $ 228 Dry Utilities Coordinator I - II $ - 170 $ 200 Sr. Principal Designer $ 145 - $ 225 Engineer Tech $ 120 - $ 150 Sr. Principal Engineer $ 225 - $ 320 Engineering Assistant I - II $ 115 - $ 140 Sr. Project Designer $ 135 - $ 200 Grant Funding Manager I - II $ 160 - $ 225 Sr. Project Engineer $ 165 - $ 225 I&E Services Coordinator $ 120 - $ 140 Sr. Resident Engineer $ 205 - $ 258 Information Systems Admin/Manager $ 135 - $ 168 Survey Assistant $ 115 - $ 145 Land Surveyor $ 195 - $ 230 Survey Technician I - V $ 143 - $ 218 Landscape Architect $ 130 - $ 200 Technical Writer I - IV $ 115 - $ 140 Landscape Designer I - II $ 120 - $ 142
Lead Automation Specialist $ 175 - $ 209 Survey Crew Rates - Regular Lead Automation Technician $ 135 - $ 170 One-Man Field $ 210 - $ 233 Lead Designer $ 140 - $ 180 Two-Man Field $ 303 - $ 319 Office Engineer / Document Control I-III $ 115 - $ 164 Three-Man Field $ 399 - $ 418 Plan Check Engineer I - II $ 140 - $ 198 Two-Man - HDS $ 348 - $ 367 Planner I - III $ 130 - $ 175
Planning Assistant $ 115 - $ 150 Survey Crew Rates - Prevailing Wage Principal Automation Specialist $ 186 - $ 232 One-Man Field $ 270 - $ 290 Principal Construction Engineer $ 210 - $ 293 Two-Man Field $ 389 - $ 412 Principal Designer $ 140 - $ 200 Three-Man Field $ 549 - $ 571 Principal Engineer $ 200 - $ 290
Electrical - Prevailing Wage
Other Direct Charges Electrician $ 207 - $ 254
Black Line Plots $2.00 per page
Outside Reproduction Cost + 15% Building and Construction Inspector - Prevailing Wage Mylar Plots $12.00 per sheet BCI Construction Inspector $ 169 - $ 201 Automation & Electrical Materials Cost + 25% (+tax) Forensics Engineering / Expert Testimony Fee Schedule Available Upon Request.

Subconsultant Fees Cost + 15%
Technology Fee $30/Day
Color Plots $5.00 per page
Travel and Related Subsistence Cost + 15%
Standard Mileage Rate IRS Rate per mile
Airplane Mileage Rate GSA Rate per mile
(effective 7/1/2024)
Expenses, such as special equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%. If the client requests, or the client’s schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as weekends, and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided outside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the client requests field services to be provided on any given Sunday, a multiplier of 2.0 will be applied to the stated rates; on or around an observed holiday, other rates may be applied. Survey Crews and Automation Field staff are billed portal to portal. A minimum charge of four hours will be charged for any Automation Field Service calls outside of normal working hours. The stated rates are subject to change, typically on an annual basis.

Fee Schedule will remain fixed throughout
the initial term of the Agreement
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 23
ZĂƚĞ^ĐŚĞĚƵůĞ͘
Billing Rate
STAFF CLASSIFICATION Min Max
Support Staff I $104 $136
Support Staff II $163 $222
Assistant Engineer/Planner $113 $155
Associate Engineer/Planner $135 $183
Engineer/Planner $140 $196
Senior Engineer/Planner I $195 $246
Senior Engineer/Planner II $228 $264
Lead Engineer/Senior Manager $236 $315
Associate Vice President/Principal/Director $258 $349
Vice President/Chief Scientist $343 $454
ŝůůŝŶŐZĂƚĞƐĞĨĨĞĐƚŝǀĞĨŽƌĨŝƌƐƚƚŚƌĞĞ;ϯͿĐŽŶƚƌĂĐƚLJĞĂƌƐ͘ dĂƐŬKƌĚĞƌƐǁŝůůƵƚŝůŝnjĞŝŶĚŝǀŝĚƵĂůƐƚĂĨĨƌĂƚĞƐĂƚƚŝŵĞŽĨ>ĞƚƚĞƌWƌŽƉŽƐĂůƐƵďŵŝƐƐŝŽŶ͕Ed DĂdžŝůůŝŶŐZĂƚĞƐ͘
ĞĨĂƵůƚ^ƚĂŶĚĂƌĚdĞƌŵƐĂŶĚŽŶĚŝƚŝŽŶƐ
• KƚŚĞƌĚŝƌĞĐƚĞdžƉĞŶƐĞƐƚŽďĞďŝůůĞĚĂƚĐŽƐƚ͕ƵŶůĞƐƐŽƚŚĞƌǁŝƐĞŶĞŐŽƚŝĂƚĞĚ͘ • DŝůĞĂŐĞƌĂƚĞƐǁŝůůďĞďĂƐĞĚƵƉŽŶĐƵƌƌĞŶƚ/Z^ƐƚĂŶĚĂƌĚƌĂƚĞƐ͘ Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 24
Client: Cannon Corp
Agency: City of Gardena
Project: On‐Call Professional Services
Scope of Services: Right of Way Acquisition
Date submitted: 6/3/2024
Prepared by: C Sinclair
Title/Classification Hourly Billing Rates
Advisory Manager $210
Senior Project Manager $200
Project Manager $165
Assistant Project Manager $150
Senior Right of Way Agent $135
Right of Way Agent II $110
Right of Way Agent I $110
Project Coordinator $100
Budget & Financial Controls $185
Other Direct Costs Rate
Mileage At IRS Allowable
Postage/Overnight Delivery At Cost
Property Ownership and Tenant Data At Cost
Outside Services (Vendors & Subconsultants) At Cost
Appraisal Reports/Appraisal Review Certificates Fixed Fee, At Cost Preliminary Title Reports Fixed Fee, At Cost
Staff billing rates provided do not include the Federal Acquisition Regulations (FAR) approved overhead rate for Epic Land Solutions, Inc. and are not suitable for state and federally funded projects.

If the NTP is received after 120 days from this proposal, fees and billing rates may require revision.
6/3/2024
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 25

FEE SCHEDULE
OCTOBER 2023

SERVICES
Geotechnical Engineering
LOR Geotechnical Group, Inc. provides geotechnical engineering services, including: preliminary geotechnical investigations, foundation investigations, percolation feasibility investigations, liquefaction evaluation investigations, as well as grading observation materials testing services.

Geological
LOR Geotechnical Group, Inc. provides geological services, engineering geology investigations, seismic setting studies, slope stability investigations, liquefaction susceptibility investigations, hydrology/water resource studies, and bedrock rippability evaluations.

Environmental
LOR Geotechnical Group, Inc. provides, environmental site assessments, underground storage tank investigations and remediation investigations, groundwater monitoring systems, soil and groundwater sampling and analysis, and environmental studies for property transfers.

All costs for Geotechnical Engineering, Geological, and Environmental Services are based on the site and investigative parameters requested.

FEES
The hourly personnel charges and laboratory test unit rates are as follows:

Personnel Charges-Hourly
Principal Engineer.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330.00 Project Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Staff Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Soil Technician/Deputy Inspector (Field or Laboratory) 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . $115.00 Soil Technician/Deputy Inspector (Prevailing Wage) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 Soil Technician/Deputy Inspector (CBA) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Traffic Control (Prevailing Wage) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135.00 Drafting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $105.00 Clerical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 Laboratory Testing Charges - Unit Costs
CT 202: Sieve Analysis (Soil). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120.00 CT 202: Sieve Analysis (Aggregate). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 202: #200 Sieve Wash. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $70.00 CT 205: Crushed Particle Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 206 Specific Gravity + Absorption of Coarse Aggregate. . . . . . . . . . . . . . . . . . . . . . . . . $125.00 CT 207: Specific Gravity + Absorption of Fine Aggregate.. . . . . . . . . . . . . . . . . . . . . . . . . . $165.00 CT 211: LA Rattler. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $275.00 CT 213: Organic Impurities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 CT 217: Sand Equivalent. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $130.00 CT 217: Sand Equivalent -QC.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 226: Moisture Content.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 227: Cleanness Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 229: Durability Index Fine/Coarse. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 235: Percentage of Flat and Elongated Particles in Coarse Aggregate. . . . . . . . . . . . . $110.00 CT 301: R-Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $385.00 CT 305: Swell. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $110.00 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 26
CT 307: Moisture Vapor Susceptibility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 308 & CT 366: Asphalt Concrete Density & Stability/Rubberized. . . . . . . . . . . $240.00/$295.00 CT 308: Asphalt Concrete Density/Rubberized.. . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00/$210.00 CT 309: Asphalt Concrete Theoretical Maximum Density .. . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 329: Asphalt Moisture .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 366: Asphalt Concrete Stability/Rubberized. . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00/$275.00 CT 382: Asphalt Extraction & Gradation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 382: Slurry Extraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $175.00 CT 521: Concrete Cylinder Compressive Strength. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40.00 CT 523: Beam Cylinder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00 Concrete & Beam Cylinder Hold. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12.00 ASTM D6913/7928: Mechanical Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D1557: (Modified)/ ASTM D698: (Standard) Proctor (4"). . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D1557: (Modified)/ ASTM D698: Proctor (6" or Cal-216). . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D2434: Permeability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $440.00 ASTM D2435: Consolidation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265.00 ASTM D5333: Collapse Potential. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00 ASTM D2216: Moisture Content. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 ASTM D221/D2937: Moisture/Unit Weight (Ring). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45.00 ASTM D2974: Organic Matter Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 ASTM D4318: Atterberg Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D4829: Expansion Index. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D3080: Direct Shear.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295.00 CT 3910 Wet Track Abrasion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Soluble Sulfate: (Test Kit SF-1).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 1 10% field supervision and equipment/vehicle charge will be added to all field services. 2 Rate based on current State determined prevailing wage rates as of the date of this document. Adjustments to our rates may be necessary based on the actual State determined prevailing wage rates at the time of our work.

TERMS
Reimbursable Expenses
Outside services performed by others and direct costs expended on the client's behalf are charged at cost plus twenty percent. These expenses include rental of drill rigs, bulldozers, backhoes, travel and subsistence, permits, reproduction costs, etc.

Travel Time
Travel time required to provide professional or technical services will be charged at the appropriate hourly rates.

Overtime
An overtime rate of 1.5 times the standard rate will be used for time in excess of 8 hours per day and Saturdays.

An overtime rate of 2.0 times the standard rate will be added for work on Sundays, official company holidays, and on all work in excess of 12 hours per day.

Prepayments
A retainer of fifty percent of the total fee is required for all field studies. The balance of the fee must be paid at the time the report is released to the client.

Billing
Billings will be provided periodically and will be classified by fee categories set forth above or as given by proposal.

Terms of Payment
Invoices rendered for professional services are due upon presentation. A service charge of 1.5 percent, per month, may be charged on accounts not paid within thirty days to cover additional processing and carrying costs. Any attorney's fees or other costs incurred in collecting any delinquent account will be paid by the client.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 27
3185-C1 Airway Avenue Costa Mesa, CA USA 92626 +1 714 545 2898 www.bgb-inc.com June 5, 2024
City of Gardena, CA
Fee Proposal
On-Call Professional Landscape Architecture Services
RFQ
FEE SCHEDULE – BGB DESIGN GROUP
The following rates shall be in force for a minimum period of (3) calendar years.

Standard Hourly Rates
Principal / Senior Project Manager - Art Guy $180.00/hr.

Senior Principal – Bob Borthwick $180.00/hr.

Job Captain / Project Manager – Nicole Nguyen $140.00/hr.

Senior Landscape Designer – Cele Villa, Tony Escario $115.00/hr.

Administrative / Clerical – Stephanie Satterlee $ 75.00/hr.

The City would not be billed overtime rates for BGB staff time.

City review meetings and public presentations will be billed at standard hourly rates.

Reproduction and other approved reimbursable expenses will be billed at cost plus 15% overhead.

No mileage reimbursement is requested as a part of this proposal.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 28
AKAL Consultants Project Services
AKAL Consultants (dba of AAHK, Inc – a California Corporation) 34 Monserrat Place, Foothill Ranch, CA 92610 Phone: (949) 586-1006 Brief Description of Available Professional Services
AKAL Consultants provides services to Public Agencies and Private Sector in project planning; project management; civil and structural design of public works projects; construction management; and project closing. Our team consists of experienced professional engineers, planners and consultants who take great pride in providing quality professional services that meet or exceed our clients’ expectations.

Given below is a partial list of professional services offered to the Public Agencies. • Prepare project funding applications for Local, State-aid and Federal-aid program projects • Prepare federal-aid E76 fund obligation packages and coordinate review and approval process with Caltrans and FHWA
• Prepare environmental "PES" forms for federal-aid projects, coordinate environmental (NEPA) approval process with Caltrans and FHWA
• Prepare Initial Site Assessment (ISA) reports
• Prepare Right-of-Way (ROW) Certifications
• Prepare DBE paperwork (Annual Submittals, implementation agreements, establish project specific DBE goals), prepare annual ADA Certifications
• Prepare Quality Assurance Program (QAP) in compliance with Caltrans requirements • Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects
• Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right-of-way, and construction phases
• Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures
• Construction administration/management and project closing • Assist Agencies with project audits
These services can be provided at a fixed price or on a “time and material” basis. AKAL Consultants is always looking for efficient ways to do business and successful completion of our clients’ projects.

AKAL Consultants
Kanwal J. Singh, M.S., P.E.

Principal Engineer
Office: (949) 586-1006
Cell: (949) 293-1487
Email: [email protected]
Current hourly rate is $170/hr
AKAL Consultants (dba of AAHK, Inc – a California Corporation) 34 Monserrat Place, Foothill Ranch, CA 92610 Phone: (949) 586-1006 pQy g(Q) pq
• Prepare “Contract Award Packages” for Federal-aid and State-aid projects • Prepare progress and final reimbursement requests for Federal, State and Local Measure funded projects
• Prepare CTC Vote Allocation packages for STIP funded projects • Prepare final closing reports for Grant funded projects • Project management and coordination services for planning, design, right-of-way, and construction phases
• Coordinate permit process with Caltrans and other regulating agencies • Civil and structural design of public works projects including retaining walls and special structures
• Construction administration/management and project closing • Assist Agencies with project audits
These services can be provided at a fixed price or on a “time and material” basis. AKAL Consultants is always looking for efficient ways to do business and successful completion of our clients’ projects.

AKAL Consultants
Kanwal J. Singh, M.S., P.E.

Principal Engineer
Office: (949) 586-1006
Cell: (949) 293-1487
Email: [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 29
Resumes 7
Mr. Solsona has 22 years of civil engineering experience in public works design, consisting of award-winning roadway widening, street rehabilitation and intersection improvements; sound wall and retaining wall design, preparation of traffic control plans and project study reports, and is recognized in the industry as an ADA design specialist. His proactive approach is carried out seamlessly through project management, engineering design development, and construction support services to public agencies throughout Southern California and he has a proven track record in providing innovative, cost-saving, and sustainable solutions (such as alternative pavement rehabilitation methods, including full depth reclamation and cold-in-place-recycling) on numerous street improvement projects for major arterials and residential streets.

Artesia Boulevard Arterial Improvements, Gardena, California: The City of Gardena wanted to replace existing medians along Artesia Boulevard, from Western Avenue to Vermont Avenue, with a new decorative hardscape paving solution. Based on prior discussions with City staff, the Cannon Team (including subconsultant BGB Design Group) evaluated and presented four paving solutions to the City. Our team prepared a design study (exhibit) to convey the proposed limits of add or deducted hardscape for City direction. Following approval of the conceptual design direction, Cannon completed revisions to the previously submitted 95% design PS&E. Mr.

Solsona served as Project Manager.
170th Street Improvements, Gardena, California: This project spans 0.50 miles from Normandie Avenue to Vermont Avenue. Funded partly by $500,000 from the Federal Surface Transportation Program, the project focused on enhancing street drivability and aesthetics. Key accomplishments included rehabilitating asphalt concrete pavement, repairing concrete curbs and sidewalks, upgrading curb ramps to ADA standards, and installing a traffic signal system battery backup at a major intersection. Cannon’s role encompassed preparing construction plans, specifications, cost estimates, and handling the E-76 Authorization documentation, culminating in a project that met the City of Gardena’s safety and accessibility standards.

Select Project Experience Summary
Mr. Solsona has served as Project Manager on the following projects:
• Redondo Beach Blvd Arterial Improvements, Gardena, California • Gardena Catch Basin Screens Project, Gardena, California • Rowley Park Restroom, Gardena, California
• Anaheim Modjeska Park Underground Storm Water Detention and Infiltration System Anaheim, California
• Concrete Street Pavement Reconstruction, Newport Beach, California • Cerritos Avenue Sidewalk Gap Closure, Anaheim, California • Lakeview Avenue Widening (Bastanchury to Lemon), Yorba Linda, California Professional Registration
• Civil Engineer, California,
No. 68420
• Qualified SWPPP Developer
– Practitioner #234666
Education
• Bachelor of Science, Civil
Engineering, California
State Polytechnic University,
Pomona, California
Professional Affiliations
• Member – ASCE, ACEC and
APWA
• Past Board Member –
Filipino American Society of
Architects and Engineers
Gary Solsona, PE, QSD Principal-in-Charge / Contract Manager Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 30
Marco Canta, PE Civil Design Engineer Lead
Professional Registration
• Registered Civil Engineer,
California, No. 69244
Education
• Bachelor of Science, Civil
Engineering, Louisiana State
University, Baton Rouge,
Louisiana
Professional Affiliations
• City and County Engineers
Association - Member
• Asian American Architects
and Engineers - Member
• American Society of
Civil Engineering (ASCE),
Younger Member Forum
- Served as Membership
Coordinator
Mr. Canta has 20 years of professional civil engineering experience where he has worked on various projects in public works, roadway, drainage, utilities, and site design throughout Southern California. Mr. Canta has served as project manager for water districts, major international airports, local municipalities, private developments, and public agencies. He has knowledge of AASHTO, Caltrans SPPWC, Los Angeles County, and MUTCD standards. He is technically proficient with Civil 3D, MicroStation, InRoads, StormCad, Flowmaster, and HydroCalc.

Redondo Beach Boulevard Arterial Improvements, Gardena, California: The City of Gardena Public Works Department (City) retained the professional engineering services of Cannon to provide PS&E design services for the Redondo Beach Blvd Arterial Improvements Project from Crenshaw Blvd to Vermont Ave, approximately 1.9 miles in length. The project improvements propose to improve safety, access, and corridor traffic operations by modifying the existing raised medians and installing new raised medians to replace the existing two-way left turn medians, extend left turn pockets, and improve traffic channelization. Other components related to the design of the corridor include pavement reconstruction / rehabilitation, addition of bulb-outs (which require evaluating existing drainage systems), upgrading existing curb ramps to ADA compliance, upgrades to the traffic signal system. Mr. Canta served as Senior Civil Engineer on this project.

Select Project Experience Summary
Mr. Canta served as Project Manager or Senior Civil Engineer on the following projects:
• San Juan Water Main Replacement, Sewer Main Improvements, and Street Reconstruction Project, Fullerton, California
• Brookhurst Street Sanitary Sewer Improvement Project, Anaheim, California • Artesia Boulevard Arterial Improvements, Gardena, California • Manhattan Beach Boulevard Resurfacing, Redondo Beach, California • Lakeview Ave Widening (Bastanchury to Lemon), Yorba Linda, California • Redondo Beach Blvd Arterial Improvements, Gardena, California • Design Services for 2022 Pavement Rehabilitation, Carpinteria, California • Lakewood Blvd. and Imperial Hwy. Intersection Improvement Project, Downey, California
• Lancaster Avenue J PSR-PDS and PA&ED, Lancaster, California • Malibu Civic Center Way Realignment Project, Malibu, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 31
Michael Kielborn, PE, QSP, LEED AP Water Resources Lead Professional Registration
• Registered Civil Engineer,
California, No. 70112
• LEED Accredited
Professional
• Certified Horizontal
Directional Drilling (HDD)
Inspector
Education
• Bachelor of Science,
Civil Engineering, Loyola
Marymount University, Los
Angeles, California
Professional Affiliations
• Association of Water
Agencies of Ventura County
• American Public Works
Association
• American Water Works
Association
• California Water
Environment Association
• North American Society for
Trenchless Technology
• National Association of
Sewer Service Companies
Mr. Kielborn specializes in water and wastewater management planning; water supply, storage, and distribution; and sewer system engineering. Since 1999, Mr. Kielborn has provided construction management/inspection services, primarily working in underground utility construction and infrastructure design. Since 2003, he has served as Project Manager for improvements to water supply and wastewater systems for numerous reservoirs, pump stations, wells, surge tanks, major water transmission mains, and trunk sewers. Mr. Kielborn is a certified Horizontal Directional Drilling Inspector. He has effectively translated his knowledge of construction practices into creating facility designs that are more efficiently constructible. Mr. Kielborn has developed excellent project management, cost estimation, in-field engineering management, inspection, coordination, and scheduling abilities for multi-million-dollar projects.
15 MG Zone 1 Reservoir Interior Coating and Improvements, Irvine Ranch Water District (IRWD), Irvine, California: IRWD’s 15 MG, welded steel Zone 1 Reservoir required an evaluation and a recoating/repair plan. Cannon provided engineering design services, including a diver inspection, basis of design memorandum, final repair plans and specifications, construction support, and coatings inspection. Cannon evaluated interior coating options; remediated corroded interior steel; replaced damaged appurtenances; provided improvements for securing the submersible sample pump and tank mixer; and designed improvements for the internal cathodic protection system. Mr. Kielborn served as Project Manager.

Ritter Ranch Recycled Water System Master Plan, Los Angeles County Waterworks District, Palmdale, California: As Project Engineer, Mr. Kielborn assisted with the master planning and sizing process on this project, which included preparing a Water System Master Plan for the development and neighboring developments such as City Ranch and Joshua Ranch. The Ritter Ranch development land use resulted in sizing more than 20 potable-water reservoirs, nine pump stations, pressure-reducing stations, supplement wells, and miles of water transmission mains.

Summary of Select Project Experience
• San Juan Area Water Main, Fullerton, California
• Fullerton Rancho-Verona Water Main Replacement, Fullerton, California • Euclid and Rosecrans Water Main Rehabilitation, Fullerton, California • Norwalk Manhole Inspection Project FY 18/19, Norwalk, California • Morro Bay, Hwy 1 Force Main Pipeline Assessment, Morro Bay, California • Pipeline Assessment at Tuckers Grove Creek Crossing, Goleta Water District, Goleta, California
• Design for Drainage Improvement Project, Oceano, California • Elizabeth Lake Road Pump Station, Palmdale, California • Las Virgenes Municipal Water District (LVMWD) Cornell Pump Station, Las Virgenes, California
• Beverly Hills Pump Station No. 8, Beverly Hills, California • Avenue O-12 and 25th West Water Demand Analysis, Palmdale, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 32
Patrick Riddell, PE, QSD, CPII Construction Manager / Resident Engineer Professional Registration
• Registered Civil Engineer,
California, No. 72034
• Certified Public
Infrastructure Inspector
(CPII), American Public
Works Association
• Qualified SWPPP
Developer/Practitioner
(QSD/QSP), No. 72034
Education
• Bachelor of Science,
Environmental Engineering,
California Polytechnic State
University, San Luis Obispo,
California
• Caltrans Resident Engineer
Academy
Certification
• Lane Closure System -
Caltrans
Professional Affiliations
• American Society of Civil
Engineers
• American Public Works
Association
Training
• Excavation Safety Training
for Competent Persons
(CPT), United Academy, ID:
1544359
As Construction Manager/Resident Engineer, Mr. Riddell provides direct support to Cannon’s resident engineer and construction management staff, including direct supervision of the overall project construction administration, pre-construction meetings, shop drawing review, inspections, processing of pay requests, assessing and resolving unforeseen conditions during construction, monitoring of schedules and budgets, overseeing equipment and materials testing, reviewing record drawings and certifications for accuracy, and confirming that work is in conformance with the contract documents and permit conditions before final acceptance. He also participates in conferences and meetings; coordinates activities with community and regulatory agencies; reviews and/or recommends acceptance of pay requisitions submitted by contractors; investigates and provides recommendations on contractor claims, change orders, etc.; and works with the Resident Engineer in the resolution of issues if encountered.

Ocean Boulevard Improvements, Pismo Beach, California: The City of Pismo Beach secured Emergency Relief funding from the Federal Highway Administration, administered locally through the Caltrans Department of Local Assistance to address the bluff damage and prevent continued bluff retreat. The City selected Cannon to provide construction management, inspection, materials testing, environmental and cultural resource monitoring, and administrative services. Mr. Riddell served as Principal-in-Charge.

Summary of Select Project Experience
Mr. Riddell has served as Principal-in-Charge or Project Manager on the following projects:
• City of Gardena CM & Inspection and Civil Engineering Design On-Call • Golden State Water Company CM & Inspection On-Call
• City of El Monte Construction Management On-Call
• City of Santa Monica CM, Project Management, Civil Design On-Call • Santa Clarita Valley Water District CM & Inspection and Civil Design On-Call • Three Valleys Municipal Water District Engineering and Surveying Services On-Call • City of Yorba Linda Engineering, Plan Check, and Surveying Services On-Call • City of Lake Forest Professional Services On-Call
• City of Santa Ana On-Call Construction Management
• Camrosa Water District CM & Inspection On-Call
• City of Thousand Oaks CM, Civil Engineering Design, and SCADA On-Call • 2020-2021 and 2022-2023 Pavement Rehabilitation Project, Goleta, California • Construction Management Services for Arterials 2023, San Luis Obispo, California • 2022 Paving Project, Pismo Beach, California
• Design and Construction Management for Measure K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California • Tank Farm and Orcutt Roundabout, San Luis Obispo, California • Golden Hill and Union Road Intersection Improvements, Paso Robles, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 33
Professional Registration
• Registered Civil Engineer,
California, No. 72982
Education
• MBA, University of
Phoenix, Arizona
• BS, Civil Engineering,
University of California,
Irvine, California
Paul Frislie, PE, IMSA Traffic Engineer
For over 23 years, Mr. Frislie has been involved in several transportation and traffic engineering projects that include both planning as well as design and deployment of ITS, systems integration, and traffic signal design. Recently, he has served as the Project Manager for the Manhattan Beach Downtown Signal Upgrade project, the Manhattan Beach Blvd/Peck Avenue Signal Modification Project, Artesia Boulevard Arterial Improvement Project, Corona ATMS Phase 3, and the La Canada Soundwall Phase 3 and 4 projects. He has also been the Lead Design Engineer for the development of design plans for the Oxnard ITS Master Plan Design Project, Vermont Avenue Arterial Improvement project, Newport Beach ITS Phase 1, 2, 3, 4 and 7 Projects and the Fountain Valley Phase IV project, as well as the Signal Construction Inspector for completion of the Oxnard ITS Master Plan and the Hawthorne Fiber Optic Communication Projects.

Summary of Select Project Experience
Mr. Frislie’s relevant projects include:
• Euclid Street Corridor Project Regional Traffic Signal Synchronization Program (RTSSP) – City of La Habra, California
• PS&E for I-10 Corridor Freight and Express Lane Project, San Bernardino, California • Tweedy Boulevard Signal Synchronization Project, City of South Gate, California • Citywide Traffic Signal Design & Inventory, City of Manhattan Beach, California Cannon’s Subconsultants
Professional Registration /
Certifications
• Registered Landscape
Architect, California
#2214
• Registered Landscape
Architect, Nevada #488
• Landscape Irrigation
Auditor #81986
Education
• BS, Landscape
Architecture, California
State Polytechnic
University, Pomona
Arthur Guy, ASLA, CLIA Landscape Architect
Arthur Guy has over 40 years of landscape architecture and irrigation design experience; the previous 25 years as Principal with BGB. Among multiple duties, Mr. Guy directs a comprehensive approach to irrigation design for the firm and serves as the technical liaison pertaining to water management issues which arise during the planning, design, and implementation phases of projects. Mr. Guy’s knowledge of horticulture extends from high desert to tropical bioregions, enabling him to effectively design planting and irrigation systems appropriate to individual environmental requirements. Additionally, Mr. Guy provides landscape and irrigation plan check services relating to the City of Rancho Santa Margarita’s Water Conservation Landscape Ordinance.

Summary of Select Project Experience
Mr. Guy was the Principal on the following projects:
• Railroad Corridor Pedestrian Beach Trail, City of San Clemente, California • University Drive City of Irvine, California
• Esplanade Streetscape, City of Redondo Beach, California • West Pacific Coast Highway Streetscape, City of Newport Beach, California • Plano Trabuco Median, City of Rancho Santa Margarita, California • North El Camino Real Streetscape, City of San Clemente California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 34
Certifications
• Registered Civil Engineer,
California, No. C43764
Education
• BA, Environmental
Analysis & Design,
with a minor in Urban
& Regional Planning,
University of California,
Irvine
Kanwal Singh, PE Funding Specialist
Mr. Singh is a California licensed Professional Civil Engineer with over 35 years of broad-based experience in the public and private sectors. He has served as project manager and project engineer for several projects from less than $1 million to over $50 million. Mr. Singh has extensive experience in delivery and tracking of local agency transportation improvement projects funded with local sales tax Measure, State or Federal-aid funds. He has developed and/or implemented funding guidelines for local measures and federal-aid programs for transportation improvement projects.

Summary of Select Project Experience
• Prepared project grant applications for various funding programs, including local sales tax Measure, State-aid, and Federal-aid programs. • Prepared and obtained approvals from Caltrans for E76 fund obligation packages for various federal-aid program transportation improvement projects. • Prepared “PES” forms for federal-aid projects for NEPA environmental clearance from Caltrans.
• Prepared DBE packages for approval from Caltrans for the Cities. • Provided construction administration/management services for various Local agency projects funded with Federal-aid and State-aid funds.
• Prepared contract award packages, progress, and final closeout reimbursement invoices for approval from Caltrans for Federal and State grant funds.

Cannon’s Subconsultants
Professional Registration
• Registered Civil Engineer,
California, No. CE 34996
• Registered Geotechnical
Engineer, California, No.

GE 2030
Education
• BS, Civil Engineering,
Cal State University,
Northridge, California
John Leuer, CE, PE Geotechnical Engineer
Mr. Leuer has over 35 years of professional experience in the geotechnical and civil engineering field. In this time, Mr. Leuer has developed an extensive knowledge of the many geotechnical considerations involved in construction in the southern California area. Mr. Leuer is highly experienced in all aspects of soil and foundation engineering for a wide variety of projects ranging from multi-story commercial and industrial structures to several thousand acre planned community developments. Mr. Leuer has substantial experience coordinating projects for many City, County, and State agencies as well as in the public sector, gaining a reputation for being responsive to clients needs while providing strong technical expertise.

Summary of Select Project Experience
Mr. Leuer was the Project Manager on the following projects:
• On-Call Compaction Testing and Materials Testing Services Provided During Construction, 2023 Citywide Pavement Rehabilitation Services, Perris, California • On-Call Geotechnical Observation, Compaction Testing, and Materials Testing Services Provided During Construction, Moreno Valley, California • On-Call Geotechnical, Compaction Testing, and Materials Testing Services Provided During Construction, Auto Center Drive Pavement Rehabilitation Project, Lake Elsinore, California
AKAL Consultants Project Services
nsultants (dba of AAHK, Inc – a California Corporation) rief Description of Available Professional Services
ides services to Public Agencies and Private Sector in project planning; project structural design of public works projects; construction management; and am consists of experienced professional engineers, planners and consultants n providing quality professional services that meet or exceed our clients’ list of professional services offered to the Public Agencies. ect funding applications for Local, State-aid and Federal-aid program projects ral-aid E76 fund obligation packages and coordinate review and approval Caltrans and FHWA
ronmental "PES" forms for federal-aid projects, coordinate environmental roval process with Caltrans and FHWA
al Site Assessment (ISA) reports
ht-of-Way (ROW) Certifications
paperwork (Annual Submittals, implementation agreements, establish project E goals), prepare annual ADA Certifications
ity Assurance Program (QAP) in compliance with Caltrans requirements ntract Award Packages” for Federal-aid and State-aid projects ress and final reimbursement requests for Federal, State and Local Measure cts
Vote Allocation packages for STIP funded projects
closing reports for Grant funded projects
agement and coordination services for planning, design, right-of-way, and phases
ermit process with Caltrans and other regulating agencies uctural design of public works projects including retaining walls and special administration/management and project closing
cies with project audits
ovided at a fixed price or on a “time and material” basis. AKAL Consultants icient ways to do business and successful completion of our clients’ projects. s
P.E.
cox.net
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call Civil Services Cannon 35
Licenses / Certifications
• California Real Estate
Broker #01944802
• Certified Right-ofWay Agent (RWA),
International Right-ofWay Association (IRWA)
Education
• BS, Business
Administration/Real
Estate, California State
Polytechnic University,
Pomona
Addiel Flores Right-of-Way Acquisitions Specialist
Addiel Flores is a right-of-way Project Manager with over ten years of experience transacting real estate and performing acquisition/negotiations on behalf of public agencies for transit and transportation infrastructure projects. Addiel is experienced with the acquisition of property subject to eminent domain in California and has coordinated the sale of remnant land on behalf of government entities. As Right-ofWay Lead, Addiel will provide on-call oversight of comprehensive right-of-way services, including right-of-way cost estimation, appraisal coordination, title coordination and review, acquisition negotiation, relocation assistance, escrow coordination for easement, fee, or temporary construction easements, and closing services.

Summary of Select Project Experience
• City of Bell Gardens, Garfield Avenue/Eastern Avenue Intersection Improvement, Bell Gardens, California
• City of Downey, Lakewood Boulevard and Florence Avenue Intersection Improvement Project, Downey, California
• City of Fontana, Safe Routes to Schools (SRTS) Pedestrian Improvement Project, Fontana, California
• City of Pico Rivera, Right-of-Way Acquisition Services for Pedestrian Bridge Overcrossing, Pico Rivera, California
• City of Anaheim, Nohl Ranch Open Space Trail Project, Anaheim, California:

Cannon’s Subconsultants
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
16842 Von Karman Ave., Suite 150
Irvine, CA 92606
949.753.8111
Reliable
Responsive
Solutions
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Reliable Responsive Solutions
Proposal for
Construction
Management
and Inspection
On-Call Services
Gardena
City of
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
Table of Contents
Section 1: Firm Qualifications and Experience ...............................4 Familiarity of regional grants/competitive funds ..................................................... 8 Section 2: Personnel and Experience...............................................9 Section 3: Organization Chart ............................................................ 11 Section 4: Similar Projects/Services................................................ 15 Section 5: References ......................................................................... 28 Section 6: Fee Schedule..................................................................... 29 Section 7: Resumes.............................................................................. 33 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
City of Gardena June 13, 2024
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, PE, Assistant Public Works Director
Subject: Statement of Qualifications for On-Call Construction Management and Inspection Services
Dear Mr. Kwak:

The City of Gardena (City) is seeking construction management and inspection services on an as-needed basis to support the City’s Public Works Capital Improvement Program (CIP). Our interest in this on-call contract stems from our Construction Management Division’s successful history of working with the City and on other similar public improvement projects. Our extensive knowledge of construction management practices for public works projects, established communication strategy, and success in reducing exposure to claims and litigation will support the City’s goals for this agreement.

On-Call Experience
Cannon will provide in-house construction management/inspection, civil, water resource, and surveying services. Throughout the past 48 years, Cannon has managed on-call contracts with public agencies using our standard best practices that are based on communication and responsiveness, specifically responding to emails, phone calls, and requests from our clients in a timely manner. Cannon has an outstanding record of delivering services on time and within budget. We will operate as an extension of City staff and will keep the City’s goals for projects at the forefront of our decision process.

Subconsultants
We have selected stellar subconsultants with whom we have a long working relationship. AVANT-GARDE (AGI) will provide public outreach and grant writing services, and LOR Geotechnical Group, Inc. will provide geotechnical engineering services.

Required Statements
• Cannon and its subconsultants have no disciplinary actions to disclose. • Cannon acknowledges the receipt and review of addendum one. • Cannon has reviewed the City’s sample agreement and insurance requirements and takes no exceptions.

We look forward to the opportunity to work with the City to achieve its goals and objectives. We are available to answer questions through the contact methods provided below, or to further discuss this proposal.

Sincerely
Category: Construction Management and Inspection
We will operate as
an extension of
City staff and will
keep the City’s
goals for projects
at the forefront
of our decision
process.

Patrick Riddell,* PE, CPII, QSD/P Main Point of Contact Director, Construction Management Division
1050 Southwood Drive, San Luis Obispo, CA 93401
( 805.503.4586 📱 805.235.0576  805.503.4446 * [email protected] *Authorized to bind firm.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 4 Firm Qualifications and Experience 1
Experience Counts
Cannon offers relevant expertise in the following areas:

Pavement Rehabilitation
and Full Depth Reclamation
Digouts, Striping, Marking,
and Curb Painting
Green Streets / Complete
Streets
ADA Improvements and
Curb Ramp Enhancements
Sidewalk, Curb, Gutter, and
Driveway Approach Repairs
Grading and Drainage
Office Locations
Services for the City will be provided primarily from
our Irvine office with support from our other offices, if needed. Cannon office locations include the following:

Irvine
16842 Von Karman Ave.

Suite 150
Irvine, CA 92606
( 949.753.8111
Ventura
305 S Kalorama St.

Suite A
Ventura, CA 93001
( 805.503.4590
Los Angeles
11900 W Olympic Blvd.

Suite 530
Los Angeles, CA 90064
( 310.664.1166
San Luis Obispo
1050 Southwood Dr.

San Luis Obispo, CA 93401
( 805.544.7407
Firm Profile
As a full-service construction management and inspection, engineering design, and surveying firm, Cannon takes
pride in the ability to offer clients a complete range of services. Our commitment to providing clients Reliable
Responsive Solutions, whether the project scope is
expansive or more specialized, spans 48 years.

During that time, we have worked with many cities,
counties, and agencies to maintain secure and dependable water systems; make streets safer and more pedestrian
and bicycle-friendly; and construct buildings and facilities that are structurally sound. These characteristics have been an integral part of the infrastructure improvement projects we have completed throughout California.

Our multidisciplinary team of 146 professionals includes the following:
• APWA Certified Public Infrastructure Inspectors
• Caltrans Trained Resident Engineers and LAPM
Specialists
• Registered Civil, Structural, Mechanical, and Electrical Engineers
• Licensed Land Surveyors and Survey Technicians
• Instrumentation and Controls (SCADA) Specialists
• County-, State-, and Federal-Level Funding
Administration Managers
Cannon Corporation- Providing Reliable Responsive Solutions since 1976

PROCORE
To efficiently maintain project documents, drawings,
contract change orders, contractor submittals, shop
drawings, and correspondence, we use electronic and
hard copy record keeping formats. For the electronic
format, we propose use of PROCORE. PROCORE helps
drastically increase project efficiency and accountability by streamlining and mobilizing project communications
and documentation. We currently have a
subscription and use PROCORE on a majority
of our CM projects. This
leads to more teamwork,
less rework, and a
smoother project.

Read more about our experience on pages 15-27.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 5 Cannon’s Canons
Cannon has principles, otherwise known as Cannon’s “Canons,” that are simply how we do business.

Two to Four, Never More: While it is not always possible to be available by phone, we pledge to return voice, email, and text messages within four hours.

Think Ahead: We are proactive, preemptive, and prepared.

We keep clients informed and provide updates before they call looking for them.

Be Reliable: We communicate with our clients and
teammates what we are going to do and then get it done.

Stand on the Shoulders of Others: We strive
to improve our operations system by using templates,
procedures, and what has worked in the past.

FIRM STATISTICS
200+
years of design
experience
100+
cumulative years
of on-call contracts
professional
engineers
48 years in
40+
business
Since 1976, Cannon has been committed to providing engineering services. Our reputation is a direct result of our consistent attention to our clients’ needs. Eighty percent of our firm’s business is with repeat clients who trust in our integrity, as well as our professional competence. We have the expertise, experience, and capabilities to meet your needs as demonstrated in the qualifications and experience detailed in this proposal. However, the real proof of this expertise is found in what our past and current clients have to say:

David Gould, PE, District Engineer, Crescenta Valley Water District The projects that Cannon worked on for CVWD were on time and within budget. I have been pleased with the services provided by Cannon. I’ve found their personnel to be extremely thorough, diligent, and knowledgeable. I’d recommend their engineering consulting services without hesitation.

Chris Dejarme, PE, Senior Civil Engineer, City of Ventura I’ve found [Cannon’s] engineers to be extremely professional, diligent, and knowledgeable. I have been pleased with the services provided by Cannon and trust their knowledge and expertise in supporting Ventura with the City’s capital improvements.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 6 Accurate Coordination of Subconsultants
Cannon has extensive experience in accurately coordinating subconsultants, having worked with 100+ firms. From project onset, each subconsultant is integrated into our Quality Assurance process, making them fully vested and accountable members of the Cannon Team.

Quality Assurance Process
We are prepared to provide our clients services for each phase of their project, from bid support through preconstruction preparations, construction, and project close-out. As the first order of work on a project, we develop a unique Construction Management Plan which is customized to the type of work, the plans and specifications, and contractual requirements of the project. Below is our Construction Management Plan Checklist. This checklist will be used in collaboration with the City during scoping meetings to determine which specific tasks are needed. This checklist forms the basis of Cannon’s approach. This is the framework in which we monitor and enforce contract compliance, and in which we document and record the thorough inspections, materials sampling and testing, and other Quality Assurance procedures required by the contract for the successful completion of a project.

Construction Management Plan Checklist

1. 2.

3. a. Provide a sign in sheet for all attendees.
b. Keep meeting minutes that show subjects discussed, direction given and response received.
c. Document items submitted by the contractor such as: the emergency response sheet, schedule, submittals and other items of importance.
d. Confirm the authority and responsibility of all parties involved. e. Verify the start date of construction.
f. Address the concerns and needs of affected utility companies. g. Discuss unusual working conditions and permit requirements. h. Verify that the contractor will give proper notification to the residents and businesses of the start date of construction and what kind of work is being performed.

1. 2.

3. 4.

1. 2.

3. 4.

5. 6.

7. 8.

Coordinate materials testing for the project.

Notify City contact at any point in the project when a dispute arises, an unknown condition is discovered or at any time the contractor believed extra work/change order work is warranted.

Daily: Document manpower, equipment and materials used on site, separate activates, house and resources by pay item. Document Inspector arrival/departure time from site.

Notify contractor of any unacceptable condition or workmanship. Do not vary from the project specifications or design with the authority or approval of the engineer. Document the approved change.

Pre-Construction Conference:

After Pre-Construction Conference:

During Construction:

City staff will schedule the meeting; invite contractor, consultant, affected City staff, utility companies and regulating agencies.

The pre-construction meeting will be conducted by consultant staff and held in a City building. City staff assigned to the project will attend to answer and unusual questions.

The CM firm conducting the meeting must understand that the pre-construction conference sets the tone for the project. It is the contractor's first impression of the City/Consultant staff and how we operate. Be on time, professional, organized, knowledgeable of the project, convey any special requirements or concerns.

Review progress schedules submitted by the contractor and accept when satisfactory.

Log and review submittals and ship drawings as needed. Route submittals as needed for project engineer/architect's approval. Do not exceed the turnaround time.

Document any approved changes to the scheduled start date with a change order.

Disburse pre-construction meeting minutes.

Inspect and perform construction management services to ensure the project is built as designed and specified.

Log and route RFIs.

Prepare and route Draft Change Orders as required.

Prepare correspondence necessary to maintain control over the construction contract.

Below is a sample of our
Construction Management Plan
Checklist below. If requested, we
can provide the complete checklist
to the District.

CONFIDENTIAL
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 7 Cannon’s Subconsultants
LOR Geotechnical Group, Inc. (LOR), is a Certified Small business (SBE) and a multi-disciplined geotechnical engineering and consulting firm providing sound solutions and innovative strategies in the geotechnical engineering, geologic, environmental, and special inspection fields for clients since 1988.

LOR provides a comprehensive organization of qualified personnel to support the technical needs of this project. This firm has provided geotechnical engineering services for over three thousand projects within southern California.

LOR’s laboratory is currently approved by the California Department of Transportation (Caltrans). LOR’s field and laboratory personnel are Caltrans, International Code Council (ICC), American Concrete Institute (ACI), and American Construction Institute Association (ACIA) certified.

Firm Information:
• DIR number: 1000047292
• Type of organization: Soils Engineering
• Firm size: 12
• Services offered: Geotechnical
• Number of projects with Cannon: 200+
Relevant Projects with Cannon:
• Report Reviews for the Cities of Fullerton, Santa Ana, and Chino California.
• Pavement Design, Gardena, California
Firm Address:
6121 Quail Valley Court, Riverside, CA 92507
AVANT-GARDE (AGI) has built a strong reputation for providing innovative and successful solutions for a number of public agencies including the Cities of Huntington Beach, Temple City, Pasadena, Industry, Pico Rivera, La Mirada, La Puente, Hawaiian Gardens, Lynwood, Bellflower, Montebello, Maywood, Perris, Cudahy, Bell Gardens, South Gate, Alhambra, Rosemead, San Gabriel, Monterey Park, South El Monte, Ventura, Ojai, Manhattan Beach, Norwalk, Rialto, Moreno Valley, LADWP, LADOT, and METRO. Their years of practice have resulted in a solid foundation of experience and technical expertise and a dedication to integrity, excellence, and quality. They are proud of their strong reputation in meeting aggressive schedules and their ability to multi-task and provide their clients specialized attention and service. Services offered by their firm include:
• Grant Writing and Administration
• Program Management
• Funding Administration
• Compliance Management including Labor Compliance
• Construction Coordination
• Community Outreach
AGI was incorporated in September 2002 and their corporate office, from which services will be provided, is located at 807 S Lemon Ave, Diamond Bar, CA 91789. AGI is a 100% woman-owned California Corporation. AGI is a certified minority business enterprise, women business enterprise, disadvantaged business enterprise and small business enterprise (MBE, WBE, DBE, SBE).

The professional staff of AGI understand the many ways that a single project may affect the entire organization as well as its desired growth and development. They believe in working as a team and bringing their collective strengths to the table to complement each other’s efforts, ultimately resulting in options and services that best serve the client’s goals and objectives. They have extensive experience in serving municipalities with their success achieved through close attention to detail, emphasis on meeting the particular needs of each client and prompt delivery of products, studies and services.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 8 Familiarity of Regional Grants / Competitive Funds
Cannon’s approach to grant funding reflects a comprehensive understanding of the funding landscape, focusing on providing the technical support necessary to help projects remain compliant with the funder’s requirements and avoid claw-backs. Additionally, Cannon can enhance the grant application process by providing technical analyses that significantly improve the quality of grant proposals. We have produced a variety of technical studies that can strengthen the impact and competitiveness of many grant proposals, making them more persuasive and increasing their chances of success in competitive funding situations.

The following table provides a summary of our firm’s successful history of grant applications. Summary of Funding Administration Project Experience Cannon www.cannoncorp.us
Federal State CDBG FEMA
City of Paso Robles Theatre Drive Realignment ARRA $2.86 million In Progress Construction, Close-Out Miscellaneous Projects, 1998, 2000, 2002 STIP STIP various 1998-2002 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Dinosaur Caves Park Street Improvements STIP $163,000.00 2003 Authorization ITS Projects ITS $180,000.00 2005 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Promenade IV HPP

TE STIP-TE
$1.2 million 2007 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Beachcomber Stairs LWCF $210,000.00 2009 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Fourth Street Improvement STIP $473,000.00 2009 Close-Out Promenade IVB ARRA

HPP STIP-TE
$1.6 million 2011 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Price Canyon Road Improvements TEA $213,000.00 2006 Authorization, PS&E Certification, Award Package El Moro Bikeway TEA $219,996.00 2006 Award Package
Santa Ysabel Improvements - Los Osos TEA $229,443.00 2006 Authorization, PS&E Certification, Award Package San Miguel Streetscape TEA $280,000.00 2006 Authorization, PS&E Certification Main Street (Cambria) Improvement Project TEA $243,457.00 2005 Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Grant Reimbursements, Close-Out
Price Canyon Road Improvements HPP

HBP STIP
$4.1 million 2010 Authorization
Willow Road Extension / 101 Interchange SLPP $2 million 2010 Application, Authorization Hutton Road Improvements HSIP $531,000.00 2011 Authorization, Design, Environmental, Right of Way, Bidding/Award Lopez Drive Bridge HBP $160,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction Mgmt, Close-Out
Atascadero Lake Park Walkway TEA $169,000.00 2003 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Garcia Road Bridge HBP $794,645.00 2003 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, Santa Ysabel Road Rehabilitation STIP $318,000.00 2003 Authorization, Construction, Grant Reimbursements, Close-Out Santa Cruz Road Rehabilitation STIP $264,000.00 2003 Grant Reimbursements, Close-Out El Camino Real Traffic Signals ITS STIP $384,000.00 2003 Close-Out El Camino Real Enhancement STIP $298,000.00 2004 Grant Reimbursements, Close-Out La Linia Street Rehabilitation CDBG $200,000.00 2004 Design, Bidding/Award, Construction Los Osos Road Culvert Replacement CDBG n/a 2005 Permits Atascadero Lake Park Restroom Replacement CDBG $215,662.00 2006 Design, Bidding/Award, Construction Atascadero Creek Bank Restoration n/a 2006 Contract Administration Lewis Avenue Bridge TCSP $220,000.00 2008 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, San Gabriel Road - Safe Route to Schools (SRTS) SR2S $383,400.00 2010 Application, Authorization, Design, Environmental, Right of Way, Bidding/Award, City of Grover Beach W. Grand Avenue STIP-TE $600,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction Mgmt, Grant Reimbursements, Close-Out
City of Guadalupe Guadalupe Street (Route 1) HPP $351,814.00 2012 Authorization, Design, Bidding/Award, Construction, Grant Reimbursements, Close-Out Highway 1 Corridor Coastal Management Plan NSB $24,000.00 2011 Authorization, Close-Out, Contract Administration Highway 1 Corridor Gateway Monuments NSB $304,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out Highway 1 Corridor Interpretive Signs NSB $312,000.00 In Progress Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out Highway 1 Coastal Trail Plan NSB $350,000.00 2012 Authorization, Design, Environmental, Right of Way, Bidding/Award, Construction, Close-Out California Polytechnic Gilardi Road Bridge Replacement HBP $717,093.00 In Progress Application, Authorization, Close-Out Cuesta Community
College
Hollister Road Bridge Replacement HBP Cal EMA $3.4 million 2011 Construction, Grant Reimbursements, Close-Out Federal - FHWA:

City of Pismo Beach
Timeline (year
completed)
Agency Project Funding Source(s) Grant Phase In Which Services Were Provided Amount
TE = Transportation Enhancement
San Luis Obispo
Council of
Governments
LWCF = Land and Water Conservation
CDBG = Community Development Block
County of San Luis
Obispo
City of Atascadero
HPP = High Priority Projects
HSIP = Highway Safety Improvement Program
SRTS = Safe Routes to School (Federal)
ARRA = American Recovery and Reinvestment Act
ER = Emergency Relief
California Transportation Commission:

SLPP = State and Local Partnership Program
STIP = State Transportation Improvement Program
EEM = Environmental Enhancement Mitigation
SR2S = Safe Routes to School (State)
STIP = State Transportation Improvement Program
TCSP = Transportation & Community &
NSB = National Scenic Byways
ITS = Intelligent Transportation Systems
HBP = Highway Bridge Program
Prop 1B = State-Local Partnership Program
State of California:

Page 1 of 1 ends

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 9 Personnel and Experience 2
Experience Working with Public Agencies / Authorities
Cannon has had the opportunity to build professional relationships with many cities, counties, and local agency representatives throughout California. The following select list presents a summary of the municipal entities we have worked with recently:
• City of Los Angeles
• County of Los Angeles
Department of Public Works
• Los Angeles Community College
District
• Port of Long Beach
• City of Glendale
• City of Diamond Bar
• City of Manhattan Beach
• City of Irvine
• Irvine Ranch Water District
• City of Anaheim
• City of Santa Ana
• City of Fullerton
• City of Lake Forest
• City of Garden Grove
• City of Huntington Park
• Santa Clarita Water District
• Newhall County Water District
• City of South Pasadena
• City of Santa Fe Springs
• City of Redondo Beach
• City of Rancho Palos Verdes
• City of Pomona
• City of Pico Rivera
• City of Santa Monica
• City of El Monte
• City of Menifee
• City of Moreno Valley
• County of Riverside EDA
• County of San Bernardino
• City of Chino
• City of Arroyo Grande
• City of Atascadero
• City of Bakersfield
• City of Beverly Hills
• City of Buellton
• City of Carpinteria
• City of Delano
• City of Goleta
• City of Gonzales
• City of Grover Beach
• City of Guadalupe
• City of Hemet
• City of Lancaster
• City of Lompoc
• City of Lynwood
• City of McFarland
• City of Monterey
• City of Morro Bay
• City of Paso Robles
• City of Pismo Beach
• City of Salinas
• City of San Luis Obispo
• City of Santa Maria
• City of Simi Valley
• City of Soledad
• City of Solvang
• City of Ventura
• City of Vernon
• County of San Luis Obispo
• County of Kern
• County of Santa Barbara
• Orange County Public Works
• Santa Ynez Community Services
District
• Nipomo Community Services
District
• Ventura County Waterworks
District No. 8
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 10 Project Experience
CM and InspectionPavement ManagementTransportationUtilityDisaster Recovery / Emergency Repairs Construction Management and Inspection Services for Street Improvements, City of Gardena √ √ Van Ness Avenue and 139th Street Improvements Project, City of Gardena √ √ 178th Street Sewer Pump Station Renovation Project, City of Gardena √ √ Calleguas-Las Virgenes Water District Interconnection Project, City of West Lake Village √ √ Construction Management and Inspection for Street Reconstruction, City of Huntington Park √ √ Highway 46 Water Pipeline Relocation and Horizontal Directional Drilling, City of Lost Hills √ √ Mission Village – KB Homes Improvements, Santa Clarita Valley Water Agency. City of Valencia √ √ Wastewater Treatment Plant 48-inch Interceptor Sewer Main, City of Delano √ √ FEMA Emergency Repairs for Alisal Road at Various Locations, County of Santa Barbara √ √ Village Square Los Alamos Storm Drain, County of Santa Barbara √ √ √ 2020-2021 Pavement Rehabilitation Project, Goleta, California, City of Goleta √ √ 2022-2023 Pavement Rehabilitation Project, Goleta, California, City of Goleta √ √ Groves Booster Pump Station, Golden State Water Company, Orcutt, California √ √ North Depot Street and Hwy 166 and Blosser Road Right Turn Lane Traffic Signals and Street Improvements, City of Santa Maria
√ √
Huasna Townsite Road Bridge, County of San Luis Obispo √ √ Construction Management Services for Arterials 2023, City of San Luis Obispo √ √ Tank Farm and Orcutt Roundabout, City of San Luis Obispo √ √ Golden Hill and Union Road Intersection Improvements, City of Paso Robles √ √ Salinas River Segment of the Paso Robles Recycled Water Distribution System, City of Paso Robles √ √ Airport Area Infrastructure Improvements, City of Paso Robles √ √ Main West Tank and Ductile Iron Pipeline Installation, City of Paso Robles √ √ Sherwood Acres Backyard Sewer Replacements, City of Paso Robles √ √ Design and Construction Management for Measure K-14 Street Repair and Rehabilitation Program Projects, City of Grover Beach
√ √
Train Station Expansion Project, City of Grover Beach √ √ 2022 Paving Project, City of Pismo Beach √ √
Pismo Streetscape Shell Beach Road Improvements, City of Pismo Beach √ √ Ocean Boulevard Improvements, City of Pismo Beach √ √
Pismo Pier and Plaza Rehabilitation, City of Pismo Beach, California √ √ Table 1. Experience Summary
Table 1. summarizes our experience providing relevant task categories in and near the City of Gardena.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 11 Organization Chart 3
Redundancy of Staff
In addition to our key project team members in the organizational chart, Cannon is home to comprehensive construction management staff who are ready to commence project work immediately.

Local Team and Leadership
We have a local presence and can offer the City immediate service and response time to address project needs as they arise, and help meet schedule and budget requirements.

Organizational Chart
We have selected key staff who are experts with construction management and inspection services on streets, structures, drainage pipeline, water resources, and sanitary sewer systems. Our personnel have a long history teaming on road and water projects. This has enabled them to fine-tune their collaboration and coordination to deliver successful projects on time and within budget.

Resident Engineers
🔑 Matt Scholfield, PE, CCM, CPII,
QSD
🔑 Todd Bartolome, PE, QSD
Office Engineer
Marcia Bohac
Construction Inspectors
🔑 Matt Natividad, CPII,
QSD/P
🔑 Robert Estrada, CPIII
🔑 Bud Nance
Mark Williams
Ron Tegland, CPII
Colin Campbell, CPII
Principal-in-Charge
🔑 Patrick Riddell, PE, CPII, QSD
City of
Gardena
Project Manager /
Resident Engineer
🔑 Charlie Gray, PE, QSD
Caltrans Liaison /
Assistant Resident Engineer
🔑 Christine C. Kahn, PE
Subconsultants
Megan LeNoue
Public Outreach and Grant
Writing
AGI
John Leuer, CE, PE
Geotechnical Engineer
LOR
🔑 Key Team Members
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 12 Name/Role Education/
Certifications Relevant Project Experience
Principal-in- Charge
🔑 Patrick Riddell, PE,

QSD, CPII
• B.S., Environmental
Engineering
• Registered Professional
Civil Engineer, No. 72034
• Caltrans Resident
Engineer Academy
• CPII Certified Public
Inspector
• Qualified SWPPP
Developer
• 2020-2021 and 2022-2023 Pavement Rehabilitation
Project, Goleta, California
• Construction Management Services for Arterials 2023,
San Luis Obispo, California
• 2022 Paving Project, Pismo Beach, California
• Design and Construction Management for Measure
K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California
• Tank Farm and Orcutt Roundabout, San Luis Obispo,
California
Project Manager /
Resident Engineer
🔑 Charlie Gray, PE,
QSD
• B.S., Civil Engineering
• Registered Professional
Civil Engineer, No. 81321
• Caltrans Resident
Engineer Academy
• Qualfied SWPPP
Developer
• Construction Management Services for Arterials 2023,
San Luis Obispo, California
• Design and Construction Management for Measure
K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California
• Tank Farm and Orcutt Roundabout, San Luis Obispo,
California
• Main West Tank and Ductile Iron Pipeline Installation, Paso Robles, California
Resident Engineer
🔑 Matt Scholfield, PE,

CCM, CPII, QSD
• B.S., Civil Engineering
• Registered Professional
Civil Engineer, No. 83926
• Qualified SWPPP
Developer and
Practitioner
• Golden Hill and Union Road Intersection Improvements, Paso Robles, California
• 2023 Pavement Rehabilitation Projects, Atascadero,
California
• 2020-2021 Pavement Rehabilitation Project, Goleta,
California
• Salinas River Segment of the Paso Robles Recycled
Water Distribution System , Paso Robles, California
• Construction Management and Inspection for Street
Reconstruction, Huntington Park, California
Key Staff and Relevant Experience
Cannon is structured with an organizational framework that emphasizes both efficiency and consistency, while maintaining the flexibility required to undertake projects of varying magnitudes, large or small. In response to the unique demands of each assignment received from the City, Cannon stands prepared to promptly mobilize additional resources as necessary. Possessing extensive experience and a robust array of resources, Cannon is fully equipped to meet the City’s project timelines, objectives, and funding commitments.

The following matrix provides an overview of the qualifications and experience of our team’s key personnel. We have have also provided resumes for our team, starting on page 34..

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 13 Name/Role Education/
Certifications Relevant Project Experience
Resident Engineer
🔑 Todd Bartolome,

PE, QSD
• B.S., Civil Engineering
• Registered Professional
Civil Engineer, No. 86198
• S2020-2021 and 2022-2023 Pavement Rehabilitation
Projects, Goleta, California
• 2022 Paving Project, Pismo Beach, California
• Mission Village – KB Homes Improvements, Santa Clarita Valley Water Agency, Valencia, California
• Santa Lucia Road Pavement Rehabilitation, Atascadero, California
Construction
Inspector
🔑 Matt Natividad,

CPII, QSD/P
• B.S., Civil Engineering
• Certified Concrete Testing
Inspector
• Qualified SWPPP
Developer and
Practitioner
• CPII Certified Public
Inspector
• Earthwork Inspection
Inspector
• Golden Hill and Union Road Intersection Improvements, Paso Robles, California
• Orcutt / Tank Farm Roundabout, San Luis Obispo,
California
• Airport Area Infrastructure Improvements, Paso Robles, California
• Blosser Road Right Turn Lane at W. Main Street, Santa Maria, California
Construction
Inspector
🔑 Robert Estrada,
CPII
• OSHA Confined Sapce
Entry
• CPII Certified Public
Infrastructure Inspector
• Construction Management Services for Arterials 2023,
San Luis Obispo, California
• Ocean Boulevard Improvements, Pismo Beach, California • 2020-2021 and 2022-2023 Pavement Rehabilitation
Projects, Goleta, California
• Highway 1 Water Main Replacement Project, Oceano,
California
• Paso Robles Annual Pavement Striping, Paso Robles,
California
Construction
Inspector
🔑 Bud Nance
• HAZWOPER
• Environmental Safety
• Confined Space Entry /
Rescue
• Trench Shoring
Competent Person
• Nipomo Community Service District (NCSD) Southland
WWTF Wet Well Rehabilitation Project, Nipomo,
California
• Perfumo Canyon Sewer Lift Station Pump/Wet Well
Force Main Installation New Development Project, San
Luis Obispo, California
• Laguna Sewer Lift Station Pump/Wet Well Force Main
Installation Replacement Project, San Luis Obispo,
California
• Tank Farm Lift Station Pump/Wet Well, Gravity
Main, Force Main Replacement and Relocation, and
Emergency Generator Installation, San Luis Obispo,
California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 14 Name/Role Education/
Certifications Relevant Project Experience
Construction
Inspector
🔑 Mark Williams
• Local Assistance Resident
Engineer Academy
• American Red Cross,
Certified in Adult and
Child First Aid/CPR/AED
• OSHA Competent Person
• Roadway Sealing Project 2020, San Luis Obispo,
California
• Downtown Paving Project, San Luis Obispo, California
• South Broad Street Improvements, San Luis Obispo,
California
• Damon Garcia Sports Field, San Luis Obispo, California • Terrace Hill PRV, San Luis Obispo, California
Caltrans Liaison
/ Assistant
Resident Engineer
🔑 Christine C. Kahn,
PE
• B.S., Civil Engineering
• Registered Professional
Civil Engineer, No. 41877
• OSHA-Confined Space
Entry, No. 132326
• Asphalt 101 for Civil and
Geotechnical Engineers
– Asphalt Pavement
Alliance
• Blosser Road Right Turn Lane at W. Main Street, Santa Maria, California
• 2021 Pavement Inspection Services, Guadalupe,
California
• Measure K-14 CIP, Grover Beach, California
• County of San Luis Obispo, Huasna Townsite Road Bridge Rehabiliation, Oak Shores, California
• County of SLO 2023 Storm Damage Repair Work, San
Luis Obispo, California
• Pismo Pier and Plaza Rehabilitation, Pismo Beach,
California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 15 Similar Projects/Services 4
Street Reconstruction Project, Huntington Park, California: The City of Huntington Park wanted to upgrade and replace various components of the City’s infrastructure system. Improvements included pedestrian safety and mobility enhancements, ADA-compliant pedestrian ramp upgrades, striping, and removal and replacement of existing water and sewer service laterals.

Cannon provided construction management and inspection services and monitored compliance
with Greenbook standards,
public contracting
code, and procurement
requirements.

Reference Cesar Roldan, Public Works Director
City of Huntington Park
6550 Miles Avenue, Huntington Park CA 90255
 323.584.6320  [email protected]
• Street enhancements
• ADA compliance
• Water /sewer service laterals
2020-21 and 2022 -23 Pavement Rehabilitation Projects, Goleta, California: The City of Goleta’s major street maintenance project encompassed 12 roadway segments and included ARHM overlay; AC mill and fill; full depth reclamation; ADA pedestrian ramp upgrades; subsurface material replacement / compaction; setup and maintenance of traffic control systems; concrete ADA compliant curb ramps and gutters; crushed aggregate base and AC pavement; and traffic striping and
markings. Cannon provided
construction management
and inspection during each
phase of construction.

Reference Debbie Talarico Project Manager
City of Goleta
130 Cremona Drive, Suite B, Goleta, CA 93117
 805.755.4445  [email protected]
• Striping and markings
• ARHM overlay
• ADA compliance
• Traffic control
Carpinteria Avenue and Pedestrian Safety Improvements
Carpinteria, California: This project included pedestrian improvements of approximately 1,200 feet of roadway frontage along the southwest side of Carpinteria Ave. Cannon provided construction management services, involving upgrades to the existing sidewalks to include ADA access, a new vehicle entrance, and a vehicle pull out for dropping-off children. Improvements included pedestrian accommodation for a future skate park facility and incorporated a tie-in to an
existing bike path to allow
pedestrians clear passage.
• Sidewalk improvements and
pedestrian accommodation
• Bike path tie-in
• ADA access
Reference John Ilasin PW Director / City Engineer
City of Carpinteria
5775 Carpinteria Avenue, Carpinteria, CA 93013
 805.684.5405  [email protected]
Van Ness Avenue and 139th Street Improvements Project
Gardena, California: This project improved pedestrian safety and traffic circulation for motorists and drainage patterns. Cannon provided construction management and inspection for improvements, which included replacing noncompliant ADA ramps; edge grinding; cold milling of the existing pavement with localized removal; replacing the existing asphalt/structural section of the highway; repaving; removal and replacement of curb, gutter, and sidewalk; removal and replacement of trees; resetting valve boxes, manhole frames, and covers; and modifying striping and signals. Project required extensive traffic control and working with emergency services, local agencies, utility companies, and the public. • Traffic control
• ADA compliance
• Pavement removal and
replacement
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 16 Downtown District and 2023 Measure F-14 projects
Atascadero, California
As a representative of the City of Atascadero, Cannon
provided construction management and inspection
services for the duration of both the Downtown District and 2023 Measure F-14 projects. Services included
communication and coordination with project stakeholders and impacted businesses and residents; verification of
traffic control plans, construction safety orders, and public safety plans; administration of contract requirements;
construction observation and daily reporting; project
recordkeeping; management of the Quality Assurance
program; progress and final payment review; schedule
review; and change order review and negotiation. The
work was completed with successful involvement and
notification of potentially impacted businesses and
accommodated all City and local events. Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Principal-In-Charge
• Matt Scholfield, PE, CCM, CPII, QSD Resident Engineer • Colin Campbell Construction Inspector
• Marcia Bohac Office Engineer
Reference: Ryan Hayes Deputy Director of Public Works
City of Atascadero
6500 Palma Avenue, Atascadero, CA 93422
( 805.470.3424 * [email protected]
Key Project Team Members:
• Charlie Gray, PE, QSD, Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-In-Charge
• Matt Natividad, CIPP Construction Inspector
• Robert Estrada Construction Inspector
• Marcia Bohac Office Engineer
Construction Management Services for Arterials 2023
San Luis Obispo, California
Reference: Anthony Ramos, PE Engineer II
City of San Luis Obispo
990 Palm Street, San Luis Obispo, CA93401
( 805.781.7100 * [email protected]
The 2023 Arterials Project is a major component of the
City of San Luis Obispo’s Pavement Management Program.

In addition to rehabilitating and maintaining pavement
on several City-wide arterial roadways, this project aims to increase accessibility and improve safety for roadway users through the implementation of active transportation infrastructure.

The City of San Luis Obispo selected Cannon to provide
construction management and inspection services.

The work includes new striping and signage, bike lane
pavement coating, new concrete medians, upgraded
curb ramps and drain inlet grates, new rectangular
rapid flashing beacon systems, and new pedestrian/
bike push buttons. Other components include replacing
deteriorating sections of storm drain and sewer systems, coating sewer manhole lids, coating existing box culverts and bridge decks with methyl methacrylate, and new city communication manholes.

Pavement
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 17 2022 Paving Project
Pismo Beach, California
Key Project Team Members:
• Todd Bartolome, PE, QSD Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-In-Charge
• Colin Campbell Construction Inspector
• Robert Estrada Construction Inspector
• Marcia Bohac Office Engineer
The 2022 Paving Project is a $10.6 million improvement
project. It is a major component of the City of Pismo
Beach’s ten-year capital improvement plan to improve
the pavement on 33% of the City’s streets. This project provided upgrades to 115 pedestrian ramps to bring them into full compliance with current ADA requirements and
included pavement rehabilitation to Mattie Road, Ocean
Boulevard, and roadways in northeast City neighborhoods.

The project scope involved a raised median to incorporate decorative pavers and new parking meters, ADA accessible parking, resurfacing of the Shell Beach Bluff Trail, drainage modifications, a sidewalk for safe pedestrian passage
under the highway 101 bridges at Spyglass Drive, curb
and gutter replacement, and utility and monument
adjustments. Cannon provided construction management,
inspection, materials testing, and administration services.

The project balanced maintaining existing infrastructure and traffic flows while making a strategic investment for community growth.

Reference: Eric Eldridge Senior Engineer
City of Pismo Beach
760 Mattie Road, Pismo Beach, CA 93449
( 805.773.7041 * [email protected]
Pavement
This project was part of the City of Grover Beach’s
Measure K-14 Street Repair and Rehabilitation Program
to repair and rehabilitate nine streets, including ADA
curb ramp installations, and work with local residents for sidewalk infill where requested. Cannon was selected by the City to provide design and construction management
and inspection services. The improvements included
roadway reconstruction, HMA paving work using
Section 39 of the Caltrans Standard Specifications, ADA compliance, implementation of water pollution control
BMPs, and traffic control support to maintain easy access on critical residential streets.

Measure K-14 Street Repair and Rehabilitation Program Projects Grover Beach, California
Key Project Team Members:
• Todd Bartolome, PE, QSD, Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-In-Charge
• Charles Gray, PE, QSD Resident Engineer
• Matt Natividad, CPII Construction Inspector
• Colin Campbell Construction Inspector
Reference: Erin Wiggin CIP Project Manager
City of Grover Beach
154 South 8th Street, Grover Beach, CA 93433
( 805.473.4567 * [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 18 Tank Farm and Orcutt Roundabout
San Luis Obispo, California
To improve traffic flow and safety at a critical intersection, the City selected Cannon to provide construction
management and observation for the Orcutt/Tank
Farm Roundabout project. The project included
overhead utility undergrounding; utility relocations
and extensions; drainage improvements; accessibility
compliant sidewalks, ramps, and crosswalks; multi-modal improvements; traveled way realignment; new pavement,
striping, markings, and signage; and numerous aesthetic enhancements.

Construction occurred during one wet season. A
significant portion involved underground utility work and drainage enhancements. Cannon’s early coordination
with stakeholders was key to approaching challenges and successfully completing the project.

Key Project Team Members:
• Charles Gray, PE, QSD Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Matt Natividad, CPII Construction Inspector
25% of budget items involved
underground utility work
Reference: Jennifer Rice Transportation Planner/Engineer City of San Luis Obispo
919 Palm Street, San Luis Obispo, CA 93401
( 805.781.7058 * [email protected]
Transportation
Golden Hill and Union Road Intersection Improvements
Paso Robles, California
The City chose a roundabout to mitigate high traffic flow through a skewed four-way stop at the intersection of
Golden Hill and Union Road. To eliminate the need for
extensive property acquisition, a one lane, dog boneshaped roundabout was designed to accommodate the increased traffic demand, including accommodations for
oversized 9-axle transports. In addition, by closing the intersection in its entirety for the duration of the project, the City was able to save millions of dollars in construction costs.

Cannon provided construction management, inspection,
construction staking, and materials testing. The work
included full depth reclamation, installing new waterlines, sewer, fiber conduits, streetlights, landscaping, curbs, gutters, sidewalks, and roadwork, and signage and striping.

Key Project Team Members:
• Matt Scholfield, Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Matt Natividad, CPII, QSD/P
Reference: Ditas Esperanza, PE Capital Projects Eng.

City of Paso Robles
1000 Spring Street, Paso Robles, CA 93446
( 805.237.3861 * [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 19 Transportation
Train Station Expansion Project
Grover Beach, California
This project consisted of expanding bus and vehicle
access, parking, and loading areas as well as relocating the station’s ingress and egress. The City of Grover Beach selected Cannon to provide construction management
and inspection, as well as materials engineering, sampling, and testing. New features for the site included grading, paving, landscaping, site lighting, signage/striping,
and the installation of curb, gutter, sidewalk, storm
drains, water and sewer lines, driveways, retaining wall and miscellaneous furnishings and amenities. Off-site
improvements included paving, concrete curb and gutter, pavement markings and striping, and storm drain features.

The project significantly improved and promoted regional, multi-modal transportation within the Highway 1 corridor and provided accessible facilities that safely accommodate train-users, pedestrians, buses, and vehicles.

Key Project Team Members:
• Charles Gray, PE, QSD Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Patrick Lodge, CPII Construction Inspector
Reference: Gregory Ray, PE Public Works Director
City of Grover Beach
154 South 8th Street, Grover Beach, CA 93433
( 805.473.4530 * [email protected]
Cannon provided construction management and design
services for traffic signal modification at Depot Street and Main Street (SR 166) and Blosser Road. The purpose of
these projects was to improve vehicular and pedestrian
safety at a previously problematic intersection. Tasks
included new sidewalk, curb and gutter, curb ramps,
bulbouts, and medians/pedestrian islands; HMA paving
and slurry seal; new striping and signage; critical traffic control; and modified striping and signage configuration.

Cannon facilitated coordination with the contractor and Caltrans; kept complete and organized construction files as required for Federal Aid projects; performed daily site observation/inspection and daily reports; reviewed and
responded to RFIs; negotiated change orders; reviewed
pay applications; provided field verification for ADA
compliance; prepared as-built records; and provided
exhibits for design changes.

North Depot Street, Hwy 166, and Blosser Road Right Turn Lane Traffic Signals and Street Improvements
Santa Maria, California
Key Project Team Members
• Patrick Riddell, PE, QSD, CPII Construction Manager
• Charlie Gray, PE, QSD Resident Engineer
• Matt Natividad, CPII Construction Inspector
• Christine C. Kahn, PE Office Engineer
Reference: Roger Olds Director of Public Works
City of Santa Maria
110 S. Pine Street, Suite 101, Santa Maria, CA 93458
( 805.688.5575 * [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 20 The City of Paso Robles received a state grant for its water resource program to support the new Recycled Water
Distribution System. The Salinas River Segment consists of an approximate 700-foot-long, 70-foot deep, and 26-inchdiameter horizontal directional drill under the Salinas River. Currently, advanced tertiary treated recycled
water is discharged into the Salinas River Segment and
ultimately flows out of the Paso Robles Groundwater
Basin. The new Recycled Water Distribution System
will alleviate drought and water shortage concerns by
redirecting this discharged water to both private and
public irrigators on the east side of the City.

Cannon provided construction management, observation
and inspection services. The scope included community
outreach, preliminary utility research, traffic control, providing change order management, daily reports, and
weekly progress meetings. Cannon also coordinated
materials and soil compaction testing, as well as
coordination with the design engineers, surveyor, RFIs, and submittals. Procore was used as the software for
organizing the project files and communication.

Salinas River Segment of the Paso Robles Recycled Water Distribution System
Paso Robles, California
Reference: Matt Thompson, PE Wastewater Manager
City of Paso Robles
3200 Sulphur Springs Road, Paso Robles, CA 93446
( 805.237.3865 * [email protected]
Key Project Team Members
• Charlie Gray, PE, QSD Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Matt Scholfield, PE, CCM, CPII, QSD Resident Engineer • Marcia Bohac Office Engineer
• Matt Natividad, CPII, QSD/P
Utility
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 21 Airport Area Infrastructure Improvements, Reconfiguration of Lift Station No. 6 with Pipeline and Back Up Generators Paso Robles, California
The City of Paso Robles experienced significant
development over past years near the Municipal Airport
area. To support this growth, the City replaced existing sewer mains, a sewer lift station, and various potable and recycled water improvements. These improvements were
completed in two phases.

Phase one consisted of demolishing and replacing sewer
lift station No. 6, around 3,500 LF of new sewer force main (some installed by HDD methods), 7,600 LF of new gravity sewer, 1500 LF of new 16-inch water main, and 5,600 LF
of new 12-inch recycled water. Phase one also included
installation of generators and electrical upgrades at
several other lift stations around the City.

Phase two consisted of 6200 LF of new potable water main to improve circulation, water quality and fire protection to the commercial areas.

Cannon’s scope included construction management;
construction observation; materials engineering, sampling, and testing; and electrical inspection and startup
assistance.

Reference: Ditas Esperanza, PE Capital Projects Engineer City of Paso Robles
1000 Spring Street, Paso Robles, CA 93446
( 805.237.3861 * [email protected]
Utility
Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Project Manager
• Matt Natividad, CPII Construction Inspector
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 22 Main West Tank and Ductile Iron Pipeline Installation
Paso Robles, California
The City of Paso Robles needed to update the 21st Street Reservoir—an unconventionally-shaped, earthen reservoir lined with gunite and HDPE. The reservoir was covered with a wood roof and truss system supported by a concrete stem wall. Constructed in 1925, it had reached the end of its useful service life.

The City decided to replace the reservoir with a new, 4.0 MG, partially buried, pre-stressed, AWWA D110, Type I concrete tank. The new reservoir was named the Main West Tank to portray its function as the main facility providing storage for the City’s Main West pressure zone.

Cannon provided construction management services and
assisted in project implementation. Services included
construction management; construction observation; and
materials engineering, sampling, and testing. The new Main West Tank was constructed at the existing reservoir site and maintained the existing hydraulic grade line for the Main West pressure. The work included demolition of the existing tank and construction of the new tank and appurtenances. These included ladders, hatches, railing, air vent, safety equipment, and various SCADA and electrical equipment.

Key Project Team Members:
• Charles Gray, PE, QSD Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Matt Natividad, CPII, Construction Inspector
Groves Booster Pump Station, Golden State Water Company Orcutt, California
Golden State Water Company (GSWC) selected Cannon to
provide construction inspection services for the Greenfield Booster Pump Station in Orcutt, California (Santa Barbara County). The project included civil/site work of the new facility site; the construction of a booster pump station; installation of generator; and instrumentation and
SCADA commissioning. Cannon’s scope of work involved
professional services in one phase, including attendance at the pre-construction conference, review of contractor submittals, support of GSWC on contractor requests for
information; coordination with the contractor regarding ongoing construction schedule; and inspection services for onsite work as proposed in the plans and specifications, including inspection of foundation, tank, coatings, cathodic protection system, and safety and structural modifications, booster pump station, and generator install by qualified personnel.

Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII - Project Manager
• Matt Natividad, CPII Construction Inspector
Reference: Karl Saluta Contract Manager
Golden State Water Company
160 East Via Verde, Suite 100, San Dimas, CA 91773
( 909.305.5427 Ext.333 * [email protected]
Utility
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 23 Highway 46 Water Pipeline Relocation and Horizontal
Directional Drilling
Lost Hills, California
As part of the Caltrans Highway 46 widening project, an existing 12-inch water main was relocated outside of the limits of the right-of-way. The widening phase began just east of the Lost Hills townsite and extended approximately 4000 linear feet east to Interstate 5. The project consisted of relocating approximately 2,300 LF of 12-inch Lost Hills Utility District waterline 200 feet north of its existing alignment. Once the new 12-inch line was completed and
commissioned, the existing 12-inch line was abandoned
and removed. Approximately 250 linear feet of the new
water main was installed. Cannon provided construction
management, inspection, and materials testing services, including submittal and RFI reviews, and contract change orders.

Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Project Manager
• Matt Natvidad, CPII Construction Inspector
Mission Village – KB Homes Improvements, Santa Clarita Valley Water Agency
Valencia, California
Cannon provided construction management and
inspection services for Potable Water Improvements for KB Homes in the Five Point Valencia Development. The project included installation of 4,460 lineal feet of 8-inch diameter ductile iron pipe, service and meter boxes, appurtenances and 70 1-inch service assemblies for this phase of the
development. Cannon coordinated with Santa Clarita
Valley Water Agency, the developer team, Five Point, and the contractor to confirm that the service line and meter connections were properly constructed. Cannon provided
consulting services for on-site observation, review of
as-built drawings, and final punch list assistance.

Utility
Reference: Ana Chavez District Manager
Lost Hills Utility District
21331 Highway 46, Lost Hills, CA 93249
( 661.797.2903 * [email protected]
Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Todd Bartolome, PE, QSD Project Manager
Reference: Joshua Gilliam
Santa Clarita Valley Water Agency
26521 Summit Cir, Santa Clarita, CA 91350
( 661.297.1600 * [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 24 Sherwood Acres Backyard Sewer Replacements
Paso Robles, California
Due to aging infrastructure, the City proceeded with a
sewer replacement project to restore integrity to the
system and to significantly reduce the potential for
sewer system overflows (SSOs), public health concerns,
and costly fines. The City selected Cannon to provide
professional engineering services to design approximately 5,000 linear feet of replacement sewer within the
backyard easements of Tracts 67 and 172, which serve
approximately 124 lots. Cannon supplemented the City’s
aerial topographic survey along the alignment in sufficient detail to prepare the plans and coordinated with the
public and private utility providers with existing facilities within the proposed alignments and obtained record
drawings and as-built information. Cannon also provided community outreach campaign to inform affected
property owners of the sewer replacement process.

Utility
After experiencing more than ten years of growth, the
City of Delano decided to complete a collections system master plan that included several major upgrades. One
of these involved upgrading an existing, 36-inch vitrified clay pipe interceptor line, which was showing signs of
corrosion, with a 48-inch polyvinyl chloride pipe trunk sewer line. An emergency pond was also incorporated
into the design to provide wastewater management and
emergency overflow area. Cannon provided construction
management and inspection services for the installation of the new 48-inch pipeline. Our construction management
team’s services included monitoring and reporting, on-site management and inspection, and cost control.

Key Project Team Members
• Patrick Riddell, PE, QSD, CPII Construction Manager
Wastewater Treatment Plant 48-inch Interceptor Sewer Main Delano, California
Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Project Manager
• Charles Gray, PE, QSD Resident Engineer
• Matt Natividad, CPII Construction Inspector
Reference: Ditas Esperanza, PE Capital Projects Engineer City of Paso Robles
1000 Spring Street, Paso Robles, CA 93446
( 805.237.3861 * [email protected]
Reference: Pedro Nunez, PE Associate Engineer/Inspector City of Delano
1015 Eleventh Avenue, Delano, CA 93442
( 661.720.2256 * [email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 25 FEMA Emergency Repairs for Alisal Road at Various Locations County of Santa Barbara, California
Huasna Townsite Road Bridge
San Luis Obispo, California
On January 14, 2023, a major disaster was declared for San Luis Obispo County due to severe winter storms, which
caused flooding, landslides, and mudslides. The Huasna
Townsite Bridge over Huasna River collapsed during the
storms. The County applied and received public assistance through FEMA to construct a temporary crossing. A
temporary, prefabricated, high- strength, steel bridge
was erected on-site and rolled from one abutment to the other abutment across the Huasna River. The length of
the Bridge from abutment to abutment was 179.5 feet.

Cannon provided construction management, inspection,
materials testing coordination, environmental and
cultural resource monitoring, communication with local
landowners, and administrative services.

Reference: Patrik Johansson, PE Project Manager
County of San Luis Obispo
1055 Monterey Street, Suite D-430
San Luis Obispo CA 93406
( 805.781.5011 * [email protected]
Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Project Manager
• Christine C. Kahn, PE Construction Inspector
Key Project Team Members
• Patrick Riddell, PE, QSD Principal-in-Charge
• Marcia Bohac Office Engineer
• Ron Tegland, CPII
Reference: German Neyra Civil Engineer Associate III
County of Santa Barbara
Public Works Department
123 East Anapamu Street, Santa Barbara CA 93101
( 805.568.3000 * [email protected]
During the winter of 2022/2023, severe storm damage
forced the closure of Alisal Road from Nojoqui Falls Park to Santa Ynez in Santa Barbara County. Cannon provided
construction management and inspection services for
the Federal Emergency Management Agency (FEMA)
funded emergency repair work at various sites along Alisal Road that included slope stabilization repairs, roadway excavation and reconstruction, new roadway paving, new
storm drain headwall construction, numerous culvert
replacements, rock slope protection (RSP), stream bed
restorations, and erosion control measures including jute netting and hydroseeding using native seed mix blends.

Disaster Recovery / Emergency Repairs
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 26 Storm events of 2017 caused severe storm damage at
the ocean front bluff and existing stormwater facilities along Ocean Boulevard. To address the bluff damage,
and prevent continued bluff retreat, the City of Pismo
Beach secured Emergency Relief funding from the Federal Highway Administration, administered locally through the Caltrans Department of Local Assistance. Cannon provided construction management, inspection, materials testing, environmental and cultural resource monitoring, and
administrative services for the project.

The scope included extending the limits of bluff
stabilization from Morro Avenue to Cuyama Avenue,
including reconstructing a damaged storm drain outfall
and beach access stairway. It also involved new ADAcompliant bluff-top scenic sidewalks and lookouts extending from Vista Del Mar to Capistrano Avenue South.

Ocean Boulevard Seawall Improvements
Pismo Beach, California
Coordinated funding requirements
through the Caltrans DLA and
Federal Hwy. Administration
Key Project Team Members:
• Charlie Gray, PE, QSD Project Manager
• Patrick Riddell, PE, QSD, CPII Principal-In-Charge
• Robert Estrada Construction Inspector
• Marcia Bohac Office Engineer
• Ron Tegland, CPII, Construction Inspector
Reference: Eric Eldridge Senior Engineer
City of Pismo Beach
760 Mattie Road, Pismo Beach, CA 93449
( 805.773.7041 * [email protected]
Village Square Los Alamos Storm Drain
County of Santa Barbara
Key Project Team Members
• Patrick Riddell, PE, QSD Principal-in-Charge
Reference: Hansel Corsa, PE
County of Santa Barbara Public Works Department
123 East Anapamu Street, Santa Barbara CA 93101
( 805.568.3000 * [email protected]
The County of Santa Barbara Flood Control and Water
Conservation District (District) is in coordination with the county planner and developer of the Legacy Estates for the improvement of the Village Square Tract offsite storm drain system located in the County of Santa Barbara. The project consisted of the construction of approximately 2,745 LF of 48” diameter RCP, 358 LF of 60” diameter RCP, and 700 LF of 72” diameter RCP. Additional work included the installation of 15 storm drain manholes, bollards, concrete overflow weir structure, headwall, trash rack, outfall protection, crushed rock lined v-ditch, and an aggregate base ranch road. Cannon provided construction management,
inspection, and materials testing.

Disaster Recovery / Emergency Repairs
Flood Control and Storm Drainage
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 27 Pismo Pier and Plaza Rehabilitation
Pismo Beach, California
The current pier was built in 1924; storms in 1983 washed out a portion of the pier; and in ’85 and ’86, sections were rebuilt, including the end of the pier and the addition of diamond-shaped sections. Following structural evaluation in 2015, the City decided to move forward with the project and proactively mitigate potential damage from future
storms that would render the pier unsafe for use.

The project involved complete replacement of the existing pier, including 183 new steel piles, new timber caps,
stringers, decking, guardrailing, firewater, sewer, and a domestic waterline. Before the pier reconstruction,
the Pismo Pier had received a major face-lift with the
addition of the “Promenade IV.” As part of the promenade improvements, an elevated boardwalk of pressure treated timber pile and bent cap construction was installed north of the existing pier to allow pedestrian access from 1st Street.

As the fourth and final phase of a multi-year project, this phase included decorative lighting installed along the
existing seawall; new cast-in-place decorated concrete
seating with decorative form work and tile inlays of ocean scenes; new showers and surrounding decorative inlaid
concrete flatwork; low impact development (LID) pavers; storm drain, sewer, and water system improvements;
underground storm water detention storage and
infiltration; repair and closure of an existing stairwell through a large sea wall, which included installation of helical piles integrated into the new section of the seawall footing; and relocating construction of a new staircase and stainless steel railing from the boardwalk to the beach below. Upgrades also included construction of parking lot and pier plaza improvements, and new restrooms. A beach access structure, which includes stairs, ADA ramp and
slide to the beach, and a playground were included and
awarded as bid alternates.

Cannon provided each aspect of Construction
Management for the project, including construction
engineering, construction inspection, materials testing, office engineering services, and funding administration.

Upgrades included a new parking
lot and beach access structure
Key Project Team Members:
• Patrick Riddell, PE, QSD, CPII Principal-in-Charge
• Charlie Gray, PE, QSD, Project Manager
• Christine Kahn, PE Construction Inspector
Reference: Eric Eldridge Senior Engineer
City of Pismo Beach
760 Mattie Road, Pismo Beach, CA 93449
( 805.773.7041 * [email protected]
Disaster Recovery / Emergency Repairs Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 28 References 5
Reference: Anthony Ramos, PE Engineer II
City of San Luis Obispo
990 Palm Street
San Luis Obispo, CA 93401
( 805.781.7100
* [email protected]
Reference: Ryan Hayes, Deputy Director of Public Works
City of Atascadero
6500 Palma Avenue
Atascadero, CA 93422
( 805.470.3424
* [email protected]
Reference: Eric Eldridge, Senior Engineer
City of Pismo Beach
760 Mattie Road
Pismo Beach, CA 93449
 805.773.7041
[email protected]
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 29 Fee Schedule 6
2024/2025 Fee Schedule
Bill Rate Ranges
Subject to change
Assistant Resident Engineer I - II $ 155 - $ 205 Project Designer $ 125 - $ 179 Associate Engineer $ 180 - $ 240 Project Engineer $ 153 - $ 205 Associate Land Surveyor $ 210 - $ 230 Resident Engineer $ 195 - $ 248 Associate Landscape Architect $ 175 - $ 215 Sr. Associate Architect $ 219 - $ 260 Automation Specialist $ 165 - $ 210 Sr. Associate Engineer $ 180 - $ 265 Automation Technician $ 130 - $ 165 Sr. Automation Specialist $ 185 - $ 225 CAD Tech $ 115 - $ 140 Sr. Automation Technician $ 150 - $ 185 CAD Manager $ 130 - $ 165 Sr. CAD Tech $ 130 - $ 160
Construction Coordinator I - II $ 125 - $ 160 Sr. Construction Manager $ 217 - $ 323 Construction Inspector I - III $ 120 - $ 200 Sr. Consultant / Principal-in-Charge $ 285 - $ 385 Construction Manager $ 178 - $ 235 Sr. Land Surveyor $ 230 - $ 275 Design Engineer $ 150 - $ 195 Sr. Landscape Architect $ 190 - $ 230 Director/ Department Manager $ 225 - $ 310 Sr. Plan Check Engineer $ 175 - $ 228 Dry Utilities Coordinator I - II $ - 170 $ 200 Sr. Principal Designer $ 145 - $ 225 Engineer Tech $ 120 - $ 150 Sr. Principal Engineer $ 225 - $ 320 Engineering Assistant I - II $ 115 - $ 140 Sr. Project Designer $ 135 - $ 200 Grant Funding Manager I - II $ 160 - $ 225 Sr. Project Engineer $ 165 - $ 225 I&E Services Coordinator $ 120 - $ 140 Sr. Resident Engineer $ 205 - $ 258 Information Systems Admin/Manager $ 135 - $ 168 Survey Assistant $ 115 - $ 145 Land Surveyor $ 195 - $ 230 Survey Technician I - V $ 143 - $ 218 Landscape Architect $ 130 - $ 200 Technical Writer I - IV $ 115 - $ 140 Landscape Designer I - II $ 120 - $ 142
Lead Automation Specialist $ 175 - $ 209 Survey Crew Rates - Regular Lead Automation Technician $ 135 - $ 170 One-Man Field $ 210 - $ 233 Lead Designer $ 140 - $ 180 Two-Man Field $ 303 - $ 319 Office Engineer / Document Control I-III $ 115 - $ 164 Three-Man Field $ 399 - $ 418 Plan Check Engineer I - II $ 140 - $ 198 Two-Man - HDS $ 348 - $ 367 Planner I - III $ 130 - $ 175
Planning Assistant $ 115 - $ 150 Survey Crew Rates - Prevailing Wage Principal Automation Specialist $ 186 - $ 232 One-Man Field $ 270 - $ 290 Principal Construction Engineer $ 210 - $ 293 Two-Man Field $ 389 - $ 412 Principal Designer $ 140 - $ 200 Three-Man Field $ 549 - $ 571 Principal Engineer $ 200 - $ 290
Electrical - Prevailing Wage
Other Direct Charges Electrician $ 207 - $ 254
Black Line Plots $2.00 per page
Outside Reproduction Cost + 15% Building and Construction Inspector - Prevailing Wage Mylar Plots $12.00 per sheet BCI Construction Inspector $ 169 - $ 201 Automation & Electrical Materials Cost + 25% (+tax) Forensics Engineering / Expert Testimony Fee Schedule Available Upon Request.

Subconsultant Fees Cost + 15%
Technology Fee $30/Day
Color Plots $5.00 per page
Travel and Related Subsistence Cost + 15%
Standard Mileage Rate IRS Rate per mile
Airplane Mileage Rate GSA Rate per mile
(effective 7/1/2024)
Expenses, such as special equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%. If the client requests, or the client’s schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as weekends, and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided outside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the client requests field services to be provided on any given Sunday, a multiplier of 2.0 will be applied to the stated rates; on or around an observed holiday, other rates may be applied. Survey Crews and Automation Field staff are billed portal to portal. A minimum charge of four hours will be charged for any Automation Field Service calls outside of normal working hours. The stated rates are subject to change, typically on an annual basis.

Fee Schedule will remain fixed throughout
the initial term of the Agreement
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 30

FEE SCHEDULE
OCTOBER 2023

SERVICES
Geotechnical Engineering
LOR Geotechnical Group, Inc. provides geotechnical engineering services, including: preliminary geotechnical investigations, foundation investigations, percolation feasibility investigations, liquefaction evaluation investigations, as well as grading observation materials testing services.

Geological
LOR Geotechnical Group, Inc. provides geological services, engineering geology investigations, seismic setting studies, slope stability investigations, liquefaction susceptibility investigations, hydrology/water resource studies, and bedrock rippability evaluations.

Environmental
LOR Geotechnical Group, Inc. provides, environmental site assessments, underground storage tank investigations and remediation investigations, groundwater monitoring systems, soil and groundwater sampling and analysis, and environmental studies for property transfers.

All costs for Geotechnical Engineering, Geological, and Environmental Services are based on the site and investigative parameters requested.

FEES
The hourly personnel charges and laboratory test unit rates are as follows:

Personnel Charges-Hourly
Principal Engineer.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330.00 Project Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Staff Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Soil Technician/Deputy Inspector (Field or Laboratory) 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . $115.00 Soil Technician/Deputy Inspector (Prevailing Wage) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 Soil Technician/Deputy Inspector (CBA) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Traffic Control (Prevailing Wage) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135.00 Drafting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $105.00 Clerical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 Laboratory Testing Charges - Unit Costs
CT 202: Sieve Analysis (Soil). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120.00 CT 202: Sieve Analysis (Aggregate). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 202: #200 Sieve Wash. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $70.00 CT 205: Crushed Particle Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 206 Specific Gravity + Absorption of Coarse Aggregate. . . . . . . . . . . . . . . . . . . . . . . . . $125.00 CT 207: Specific Gravity + Absorption of Fine Aggregate.. . . . . . . . . . . . . . . . . . . . . . . . . . $165.00 CT 211: LA Rattler. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $275.00 CT 213: Organic Impurities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 CT 217: Sand Equivalent. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $130.00 CT 217: Sand Equivalent -QC.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 226: Moisture Content.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 227: Cleanness Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 229: Durability Index Fine/Coarse. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 235: Percentage of Flat and Elongated Particles in Coarse Aggregate. . . . . . . . . . . . . $110.00 CT 301: R-Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $385.00 CT 305: Swell. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $110.00 Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 31 CT 307: Moisture Vapor Susceptibility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 308 & CT 366: Asphalt Concrete Density & Stability/Rubberized. . . . . . . . . . . $240.00/$295.00 CT 308: Asphalt Concrete Density/Rubberized.. . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00/$210.00 CT 309: Asphalt Concrete Theoretical Maximum Density .. . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 329: Asphalt Moisture .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 366: Asphalt Concrete Stability/Rubberized. . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00/$275.00 CT 382: Asphalt Extraction & Gradation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 382: Slurry Extraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $175.00 CT 521: Concrete Cylinder Compressive Strength. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40.00 CT 523: Beam Cylinder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00 Concrete & Beam Cylinder Hold. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12.00 ASTM D6913/7928: Mechanical Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D1557: (Modified)/ ASTM D698: (Standard) Proctor (4"). . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D1557: (Modified)/ ASTM D698: Proctor (6" or Cal-216). . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D2434: Permeability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $440.00 ASTM D2435: Consolidation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265.00 ASTM D5333: Collapse Potential. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00 ASTM D2216: Moisture Content. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 ASTM D221/D2937: Moisture/Unit Weight (Ring). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45.00 ASTM D2974: Organic Matter Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 ASTM D4318: Atterberg Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D4829: Expansion Index. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D3080: Direct Shear.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295.00 CT 3910 Wet Track Abrasion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Soluble Sulfate: (Test Kit SF-1).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 1 10% field supervision and equipment/vehicle charge will be added to all field services. 2 Rate based on current State determined prevailing wage rates as of the date of this document. Adjustments to our rates may be necessary based on the actual State determined prevailing wage rates at the time of our work.

TERMS
Reimbursable Expenses
Outside services performed by others and direct costs expended on the client's behalf are charged at cost plus twenty percent. These expenses include rental of drill rigs, bulldozers, backhoes, travel and subsistence, permits, reproduction costs, etc.

Travel Time
Travel time required to provide professional or technical services will be charged at the appropriate hourly rates.

Overtime
An overtime rate of 1.5 times the standard rate will be used for time in excess of 8 hours per day and Saturdays.

An overtime rate of 2.0 times the standard rate will be added for work on Sundays, official company holidays, and on all work in excess of 12 hours per day.

Prepayments
A retainer of fifty percent of the total fee is required for all field studies. The balance of the fee must be paid at the time the report is released to the client.

Billing
Billings will be provided periodically and will be classified by fee categories set forth above or as given by proposal.

Terms of Payment
Invoices rendered for professional services are due upon presentation. A service charge of 1.5 percent, per month, may be charged on accounts not paid within thirty days to cover additional processing and carrying costs. Any attorney's fees or other costs incurred in collecting any delinquent account will be paid by the client.

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 32 807 S. Lemon Ave, Diamond Bar, CA 91789
tel: 909.895-7146 • fax: 909.859.3881 • www.agi.com.co
Avant-Garde offers the following hourly rates for all services proposed under this RFP.

Program Director.................................... $150

Program Manager ................................. $135

Senior Program Coordinator ................. $125
Program Coordinator ............................ $110
Program Assistant ................................... $100

Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 33 Resumes 7
Patrick Riddell, PE, CPII, QSD Principal-in-Charge
Professional Registration
• Registered Civil Engineer,
California, No. 72034
• Certified Public
Infrastructure Inspector
(CPII), American Public
Works Association
• Qualified SWPPP
Developer/Practitioner
(QSD/QSP), No. 72034
Education
• Bachelor of Science,
Environmental Engineering,
California Polytechnic State
University, San Luis Obispo,
California
• Caltrans Resident Engineer
Academy
Certification
• Lane Closure System -
Caltrans
• Excavation Safety Training
for Competent Persons
(CPT), United Academy, ID:
1544359
• Traffic Control Supervisor
• American Traffic Safety
Services Association
Training
• Excavation Safety Training
for Competent Persons
As Principal-in-Charge/Construction Manager, Mr. Riddell provides direct support to Cannon’s resident engineer and construction management staff, including direct supervision of the overall project construction administration, pre-construction meetings, shop drawing review, inspections, processing of pay requests, assessing and resolving unforeseen conditions during construction, monitoring of schedules and budgets, overseeing equipment and materials testing, reviewing record drawings and certifications for accuracy, and confirming that work is in conformance with the contract documents and permit conditions before final acceptance. He also participates in conferences and meetings; coordinates activities with community and regulatory agencies; reviews and/or recommends acceptance of pay requisitions submitted by contractors; investigates and provides recommendations on contractor claims, change orders, etc.; and works with the Resident Engineer in the resolution of issues if encountered.

Pismo Streetscape-Shell Beach Road, Pismo Beach, California: The Shell Beach Road Streetscape - Phase I Project (Project) is a major component of the City of Pismo Beach’s overall Complete Street Plan. The well-traveled corridor along Shell Beach Road lacked multi-modal transportation elements and did not allow for connections to key destinations.

Select Project Experience Summary
Mr. Riddell has served as Principal-in-Charge or Project Manager on the following projects:
• City of Gardena CM & Inspection and Civil Engineering Design On-Call (2019) • Golden State Water Company CM & Inspection On-Call
• City of El Monte Construction Management On-Call
• City of Santa Monica CM, Project Management, Civil Design On-Call • Santa Clarita Valley Water District CM & Inspection and Civil Design On-Call • Three Valleys Municipal Water District Engineering and Surveying Services On-Call • City of Yorba Linda Engineering, Plan Check, and Surveying Services On-Call • City of Lake Forest Professional Services On-Call
• City of Santa Ana On-Call Construction Management
• Camrosa Water District CM & Inspection On-Call
• City of Thousand Oaks CM, Civil Engineering Design, and SCADA On-Call • 2020-2021 and 2022-2023 Pavement Rehabilitation Project, Goleta, California • Construction Management Services for Arterials 2023, San Luis Obispo, California • 2022 Paving Project, Pismo Beach, California
• Design and Construction Management for Measure K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 34 Mr. Gray is a Project Engineer and Construction Inspector experienced in transportation and water resource projects. Since 2010, he has provided construction observation on design for curb and crosswalk repair projects, road repair, cross sections, microsurfacing/slurry sealing, striping, and overlays, as well as stormdrain design, drainage inlets, and waterlines. Mr. Gray is also experienced in assisting with traffic control, paving operations, and tracking quantities.

Tank Farm and Orcutt Roundabout Drainage Improvements, San Luis Obispo, California: To improve traffic flow and safety at a critical intersection, this project included drainage improvements; overhead utility undergrounding; utility relocations and extensions; accessibility compliant sidewalks, ramps, and crosswalks; multimodal improvements; traveled way realignment; new pavement, striping, markings, and signage; and numerous aesthetic enhancements. Cannon provided construction management, inspection, and materials testing for this project. Mr. Gray served as Project Manager and Resident Engineer.

Select Project Experience Summary
Mr. Gray has served as Project Manager or Resident Engineer on the following projects:
• Construction Management Services for Arterials 2023, San Luis Obispo, California • Design and Construction Management for Measure K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California • Tank Farm and Orcutt Roundabout, San Luis Obispo, California • Train Station Expansion Project, Grover Beach, California • North Depot Street and Hwy 166 and Blosser Road Right Turn Lane Traffic Signals and Street Improvements, Santa Maria, California
• Salinas River Segment of the Paso Robles Recycled Water Distribution System, Paso Robles, California
• Main West Tank and Ductile Iron Pipeline Installation, Paso Robles, California • Sherwood Acres Backyard Sewer Replacements, Paso Robles, California • Ocean Boulevard Seawall Improvements, Pismo Beach, California • Pismo Pier and Plaza Rehabilitation, Pismo Beach, California • County of San Luis Obispo 2023 Storm Damage Repair Work, San Luis Obispo, California
• Pismo Beach Streetscape at Shell Beach Road, Pismo Beach, California • Pismo Beach Sea Walls Bluff Erosion at Vista Del Mar and Ocean Blvd., Pismo Beach, California
• Calleguas-Las Virgenes Water District Interconnection Project, West Lake Village, California
• Design and Construction Management Services for Measure K-14 Projects, Grover Beach, California
• Plant 209 Pump Station, Whittier, California
• Airport Pipeline Infrastructure Improvements, Paso Robles, California • North Oak Park Boulevard Rehabilitation Project, Grover Beach, California Professional Registration
• Registered Civil Engineer,
California, No. 81321
• Qualified SWPP Developer
(QSD/P)
Education
• Bachelor of Science, Civil
Engineering, California
Polytechnic State
University, San Luis Obispo,
California
Certifications
• OSHA Confined Space Entry,
No. 132723
• OSHA Fall Prevention
• Asphalt 101 for Civil and
Geotechnical Engineers –
Asphalt Pavement Alliance
• First Aid/CPR Certified
Professional Affiliations
• American Society of Civil
Engineers
Charlie Gray, PE, QSD Project Manager / Resident Engineer Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 35 Matt Scholfield, PE, CCM, CPII, QSD Resident Engineer
Professional Registrations
• Civil Engineer, California,
No. 83926
• Certified Construction
Manager, No. 30640
Education
• Bachelor of Science, Civil
Engineering, California
State University, Long
Beach, California
Certifications
• Certified Public
Infrastructure Inspector,
APWA
• Qualified SWPPP
Developer/Practitioner, No.
26102
• Safety Qualified Supervisor
Training
• OSHA 30; Confined Space
Training; Trenching &
Excavation Competent
Person; Fall Protection;
Lockout/Tagout; Hot Work
Permit
• ASME Rigging
Fundamentals Training
• First Aid/CPR Certified
Mr. Scholfield brings more than 15 years of experience in the heavy civil construction industry and more than 12 years as a project manager. He has a strong background managing self-performed work, and his technical engineering knowledge has created a valuable skill set for the safe, timely, and cost-effective completion of projects.

Pismo Paving Project 2022, Pismo Beach, California: The 2022 Paving Project was a $10.6 million improvement project and a major component of the City’s ten-year capital improvement plan. The project balanced maintaining existing infrastructure and traffic flows while supporting community growth. The project improved pavement on 33% of the City’s streets and upgraded 115 pedestrian ramps to be ADA-compliant.

Cannon provided construction management, inspection, materials testing, and administration services. Mr. Scholfield served as Resident Engineer.

Tank Farm and Orcutt Roundabout Drainage Improvements, San Luis Obispo, California: To improve traffic flow and safety at a critical intersection, this project included drainage improvements; overhead utility undergrounding; utility relocations and extensions; accessibility compliant sidewalks, ramps, and crosswalks; multimodal improvements; traveled way realignment, new pavement, striping, markings, and signage; and numerous aesthetic enhancements. Cannon provided construction management, inspection, and materials testing for this project. Mr. Scholfield served as Construction Inspector.

Golden Hill Road and Union Road Roundabout, Paso Robles, California: To eliminate the need for extensive property acquisition, a one lane, dog bone-shaped roundabout was designed to accommodate the increased traffic demand, including accommodations for oversized nine-axle transports. Cannon provided construction management, inspection, construction staking, and materials testing. The scope of work included full depth reclamation; installing new waterlines, sewer, fiber conduits, streetlights, landscaping, curbs, gutters, sidewalks, and roadwork, and signage and striping. Mr. Scholfield served as Resident Engineer.

Select Project Experience Summary
Mr. Scholfield has served as Project Manager, Resident Engineer, or Construction Manager on the following projects:
• 2020-2021 Pavement Rehabilitation Project, Goleta, California • Golden Hill and Union Road Intersection Improvements, Paso Robles, California • Salinas River Segment of the Paso Robles Recycled Water Distribution System, Paso Robles, California
• Construction Management and Inspection for Street Reconstruction, Huntington Park, California
• 2023 Pavement Rehabilitation Projects, Atascadero, California • Construction Management and Inspection for Yorba Linda Lakeview Ave. Widening from Bastanchury Rd. to Lemon Drive Street Improvement, Yorba Linda, California • Construction Management and Inspection for Well 29 Rehabilitation Improvements Project, Santa Ana, California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 36 Todd Bartolome, PE, QSD Resident Engineer
Mr. Bartolome has over 35 years of experience as a construction manager, resident and regional engineer, and engineering manager, with large wastewater, bridge, roadway, and airport project experience throughout the U.S. and overseas. His specific project experience includes management of wastewater, major highway bridge and roadway projects, as well as construction and maintenance as both a public agency representative and as a private consultant. Mr. Bartolome has also managed the design and development of project controls systems using various microcomputer systems, cost control systems, scheduling, estimating, inspection, materials testing, and field office engineering. His major project experience includes wastewater, highways, bridges, floodways, airports, and hydroelectric dams.

Construction Management and Inspection for 2020-2021 Pavement Rehabilitation Project, Goleta, California: This project was a major street maintenance project encompassing 12 roadway segments. The City of Goleta selected Cannon to provide construction management and inspection services. The work included ADA compliant pedestrian ramp upgrades; placement of asphalt-concrete (AC); pavement materials (ARHM overlay); AC mill and fill; full depth reclamation; replacement and compaction of subsurface material; setup and maintenance of traffic control systems; construction of concrete ADA compliant curb ramps and gutters; placement of crushed aggregate base and AC pavement; and replacement of traffic striping and markings. Mr. Bartolome served as Project Manager.

Construction Management and Inspection for 2022-2023 Pavement Rehabilitation Project, Goleta, California: This project was a major street maintenance project encompassing 12 roadway segments in the base bid, plus an additional 10 road segments in the Alternates A, D & I segments. The City of Goleta selected Cannon to provide construction management and inspection services. The work included ADA compliant pedestrian ramp upgrades; placement of AC; pavement materials (ARHM overlay); 4 inches of AC milling and replacement; full depth reclamation; replacement and compaction of subsurface material; setup and maintenance of traffic control systems; construction of concrete ADA compliant curb ramps and gutters; placement of crushed aggregate base and AC pavement; and replacement of traffic striping and markings. Mr. Bartolome served as Project Manager.

Select Project Experience Summary
Mr. Bartolome has served as Project Manager or Construction Manager/Resident Engineer on the following projects:
• Street Reconstruction, Huntington Park, California
• Modjeska Park Underground Stormwater Detention and Infiltration System, Anaheim, California
• Mission Village – KB Homes Improvements, Santa Clarita Valley Water Agency, Valencia, California
• Santa Lucia Road Pavement Rehabilitation, Atascadero, California • Airport Pipeline Infrastructure, Paso Robles, California • Measure K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California
Professional Registration
• Registered Civil Engineer,
California, No. 86198
• California QSP/D
Certification – 86198
Education
• Bachelor of Science,
Construction Engineering,
University of Nebraska,
Lincoln, Nebraska
• Traffic Control Supervisor
- American Traffic Safety
Services Association
• Caltrans Resident Engineer
Training
• EPA - NPDES Certification
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 37 Professional Registrations
• Certified Public
Infrastructure Inspector,
APWA
Education
• Bachelor of Science, Civil
Engineering, Western
Mindanao State University,
Philippines
Certifications
• Caltrans Certified Flagger
• Caltrans Lane Closure
System
• OSHA Confined Space Entry
• Special Inspector Certified –
International Code Council
• Certified Concrete Testing
Inspector
• First Aid/CPR
Mr. Natividad has provided construction inspection services on projects ranging from small-scale street overlays to complex, large-scale traffic improvements. His responsibilities typically include inspecting construction work, completing daily reports, helping with work site safety maintenance, and keeping track of labor and materials.

North Depot and Highway 166 Improvement Project, Santa Maria, California:

This project involved realigning a major City intersection to improve vehicular and pedestrian safety, including traffic signal modification to provide protected left turns.

Cannon was selected to provide construction management and inspection services for this project. Specific project tasks included new sidewalk, curb and gutter, curb ramps, bulbouts, and medians/pedestrian islands; HMA paving and slurry seal; new striping and signage; critical traffic control as stop control on the intersection was altered; three new field-fitted DIs; and modified striping and signage configuration.

Mr. Natividad served as Construction Inspector.

Select Project Experience Summary
Mr. Natividad has served as Construction Inspector on the following projects:
• North Oak Park Boulevard Rehabilitation Project, Grover Beach, California • Construction Administration and Inspection Services for Blosser Road Right Turn Lane, Santa Maria, California
• Santa Lucia Road, Atascadero, California
• 21st Street Green/Complete Street Improvements, Paso Robles, California • 12th Street Green Street Improvements, Paso Robles, California • 4th Street Pavement Repair, Grover Beach, California
• U.S. Highway 101 and State Route 46 East Improvements, Paso Robles, California • Five Cities Drive Turn Signal Project, Pismo Beach, California • Construction Management, Materials Testing, and Construction Survey Services for West Grand Avenue Enhancement Project Phase 3, Grover Beach, California • 2015-1 and 2015-2 Street Rehabilitation and Repair Project, Grover Beach, California
• Price Canyon Road Slope Repair, Pismo Beach, California • Pismo Pier, Pismo Beach, California
• Price Canyon Road Slope Repair, Pismo Beach, California Matt Natividad, CPII, QSD/P Construction Inspector
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 38 Certifications
• OSHA Confined Space Entry,
No. 214550
Training
• Flagger Training, California
• First Aid/CPR
Software Skills
• Microsoft Programs
• Procore
• E Builder
• Cityworks
Mr. Estrada brings more than 14 years of experience in the construction industry. He has worked as full-time inspector since 2019 with three municipalities. With a background in Public Works Transportation, he has a strong focus and commitment to site safety. From daily inspection and regular construction meetings, he is well-versed in the ins and outs of confirming work on transportation projects is completed according to plans and specifications. His staff supervisory and communication skills are best demonstrated by his ability to plan and coordinate work and resolve issues as needed.
2020-2021 and 2022-2023 Pavement Rehabilitation Projects, Goleta, California: The City of Goleta’s major street maintenance project encompassed 12 roadway segments in the Base Bid plus an additional 10 road segments in Alternates A, D, and I Segments. The work included ARHM overlay; AC mill and fill; full depth reclamation; ADA pedestrian ramp upgrades; subsurface material replacement / compaction; setup and maintenance of traffic control systems; concrete ADA compliant curb ramps and gutters; crushed aggregate base and AC pavement; and traffic striping and markings. Cannon provided construction management and inspection services during each phase of construction. Mr. Estrada served as Construction Inspector.

Highway 1 Water Main Replacement Project, Oceano, California: Oceano Community Services District was awarded a grant through the proposition 1 round 1 Integrated Regional Water Management (IRWM) implementation to upgrade and replace various components of its water distribution system.

Existing water distribution lines and service laterals had either exceeded their useful life expectancy, were undersized for current water demands and fire flows or did not meet current potable water standards. The District selected Cannon to provide construction management and inspection services, including work within Caltrans ROW for both roadway and utility improvements. Mr. Estrada provided lead inspection for installation of the new 8-inch watermain.

Paso Robles Annual Pavement Striping, Paso Robles, California: The City of Paso Robles experienced an increase in population and traffic and needed to complete annual improvements. This project involved striping and markers refreshment and maintenance on Niblick Road, 13th Street, Creston Road, and Charolais road. Mr. Estrada provided construction management and inspection of the removal and replacement of pavement marking along arterial roads.

Select Project Experience Summary
Mr. Estrada has served as Construction Inspector on the following projects:
• Annual Pavement Rehabilitation, Sunnyvale, California • Paso Robles Annual Pavement Striping, Paso Robles, California Robert Estrada Construction Inspector
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 39 Training
• California Polytechnic
State University - Irrigation
Training Research Center
Certifications
• HAZWOPER
• Environmental Safety
• Confined Space Entry /
Rescue
• Trench Shoring Competent
Person
Software Skills
• SCADA
• Electrical Troubleshooting
• Microsoft Products
• GIS
• Crystal Reports
Mr. Nance brings over 30 years of experience in public works, water resources, and waterworks. He has served as project lead and/or Wastewater Collection Supervisor for complex construction projects dealing with wastewater collection facility and storm water system operations. Mr. Nance is experienced in training and leading teams, has mastered forming an efficient and professional work environment, and inspected work sites to confirm safety procedures were being followed. Working with numerous agencies and throughout Central California has thoroughly familiarized Mr. Nance with agency regulations and expectations. His experience includes sewer lines, reservoirs, sewer lift stations, and installation, upgrade, and replacement of facilities.

Nipomo Community Service District (NCSD) Southland WWTF Wet Well Rehabilitation Project, Nipomo, California: Due to degradation and failure of the influent wet well’s coating system, specifically the roof and walls above the normal water levels, the NCSD needed to rehabilitate the influent wet well, as well as upgrade other existing piping and appurtenances. The project included development of a wastewater bypass plan, with redundancy, to allow assessment and rehabilitation work within the influent wet well. It also included the installation of a Titus Twister and its associated appurtenances that will not only help reduce corrosion of the influent wet well, but will also assist in odor control and provide significant benefits to the surrounding community. Mr. Nance served as Construction Inspector.

Select Project Experience Summary
Mr. Nance provided supervisory and construction inspection services prior to working for Cannon on the following projects:
• Perfumo Canyon Sewer Lift Station Pump/Wet Well Force Main Installation New Development Project, San Luis Obispo, California
• Laguna Sewer Lift Station Pump/Wet Well Force Main Installation Replacement Project, San Luis Obispo, California
• Tank Farm Lift Station Pump/Wet Well, Gravity Main, Force Main Replacement and Relocation, and Emergency Generator Installation, San Luis Obispo, California
• Calle Joaquin Siphon and Lift Station Replacement - Pump/Wet Well Gravity Main, Creek Siphon, Force Main Replacement, Emergency Generator Design Details, San Luis Obispo, California
• Margarita Sewer Lift Station Pump/Wet Well, Emergency Generator Design, San Luis Obispo, California
Bud Nance Construction Inspector
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 40 Training
• Erosion and Sediment
Training
• Environmental Safety
• Hazardous Waste Training
• Asbestos Training
• Traffic Control
• Discrimination and
Harassment Avoidance
• Confined Space
• Trench Safety
• Bloodborne Pathogens
• Fire Extinguisher
Certifications
• Local Assistance Resident
Engineer Academy
• American Red Cross,
Certified in Adult and Child
First Aid/CPR/AED
• OSHA Competent Person
Mr. Williams has more than three decades of experience working for the City of San Luis Obispo as a public works inspector. Mr. Williams is a Certified Public Infrastructure Inspector where he has worked in various capacities as an encroachment, capital improvement, residential and commercial tract, and erosion/sediment control inspector, leaving him well versed in each facet of constructability, construction management, and inspection.

Roadway Sealing Project, San Luis Obispo, California: Slurry seal laydown of over 19 miles of road in the City of San Luis Obispo. The project consisted of resurfacing 82 streets, striping, and installing speed bumps and other traffic safety delineators with the intent of enhancing safety and multi-modal transportation.

Mr. Williams served as Engineering Inspector and Project Manager.

Downtown Paving Project, San Luis Obispo, California: Grinding and paving of existing downtown streets. Work included the design and installation of new curb ramps and cross gutters, design and installation of new bike medians, installing new traffic signs and striping (MMA), placement of new slurry seal on existing streets, installation of new catch basins and bridge deck, and approach slab repair. Mr. Williams served as Engineering Inspector and Project Manager.

South Broad Street Improvements, San Luis Obispo, California: The South Broad Street Improvement project included the construction of ADA curb ramps and the grind and overlay of 6” HMA reconstruction of the existing roadway. Mr. Williams served as Engineering Inspector and Project Manager.

Damon Garcia Sports Field, San Luis Obispo, California: The project included the relocation of existing creek and mitigation; installation of new sports lighting, irrigation system with pumps, sand media and turf and of new block buildings.

Inspection included the oversight of new parking lots, connection of the park irrigation system to reclaimed water, modifying the existing traffic signal, construction of new walkways around the park, and installation of new curb and gutter frontage with new street lighting. Mr. Williams served as Engineering Inspector and Project Manager.

Terrace Hill Pipeline and PRV Rehabilitation, San Luis Obispo, California: The project included the installation of a new 8” and 12” pressure reducing system, new waterlines, and electrical control panels with fiber optic cabling. Work also included abandoning the existing 750,000-gallon water tank, street paving and slope mitigation, cable wiring fencing, and sound proofing. Mr. Williams served as Engineering Inspector and Project Manager.

Santa Rosa Skate Park, San Luis Obispo, California: The 15,500 Square-foot Concrete skate park included the installation of new sports lighting, an outdoor amphitheater, a low impact fitness path, public art, and a streetscape plaza for spectator seating, farmer’s market, and craft fairs. Mr. Williams served as Engineering Inspector.

Sinsheimer Park Playground, San Luis Obispo, California: This $3M, multilevel, half-acre playground required excavation of the hillside to prepare for the installation of play equipment including 3-story tower, five large slides ranging from 12 to 18 feet tall, a climbing wall, a snowboard simulator, swings and a zipline. The project included the installation of decorative hillside rubber with buffing’s, and artificial hillside turf; the addition of curb ramps, picnic tables, and new storm drains and watering stations. Mr. Williams served as Engineering Inspector and Project Manager.

Mark Williams Construction Inspector
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 41 Ron Tegland, CPII Construction Inspector
Professional Registrations /
Certifications
• Caltrans Certified Flagger
• OSHA Confined Space Entry,
No. 149209
• Caltrans Lane Closure
System
• Energy Overhead Power
Lines (OPL)
• Energy Passport D41572
PASPX1313
• Chevron Business Partner
Safety Orientation (BPSO)
Education
• Bachelor of Science,
Development and
Infrastructure, City
Planning, University of
Arizona, Tucson, Arizona
Training
• First Aid/CPR Certified
As a Construction Inspector with Cannon with 24 years of experience, Mr. Tegland serves as the client’s on-site representative. He provides coordination and oversight of the contractor to ensure plans and specifications are met and schedule and cost are maintained. Mr. Tegland has extensive experience coordinating with water districts, contractors, encroachment permit inspectors, and other stakeholders on construction projects, including pipeline installations, trenchless technology, grading, equipment and tank fabrication traffic control, and road repairs. Mr. Tegland is safety-conscious, detailed-oriented, organized, and has a proven track record of successful construction inspection and project coordination.

Ocean Boulevard Improvements, Pismo Beach, California: The City of Pismo Beach secured Emergency Relief funding from the Federal Highway Administration, administered locally through the Caltrans Department of Local Assistance to address the bluff damage and prevent continued bluff retreat. The City selected Cannon to provide construction management, inspection, materials testing, environmental and cultural resource monitoring, and administrative services. Mr. Tegland served as Construction Inspector.

Pismo Streetscape Shell Beach Road, Pismo Beach, California: As a major component of the City’s overall Complete Street Plan, the well-traveled corridor lacked multi-modal transportation for connections to key destinations. The City selected Cannon to provide construction management, inspection, materials testing, and administrative services. This project presented unique challenges in that a significant portion of the work (approximately 64%) occurred below the surface, in the replacement of underground utilities (water and storm drain) and the undergrounding of existing overhead utility lines (PG&E, AT&T, and Charter). Because this project involved Horizontal Directional Drilling (HDD) that crossed Caltrans rightof-way, Cannon facilitated conformance to their Encroachment Permit requirements and road settlement monitoring. Mr. Tegland served as Construction Inspector.

Select Project Experience Summary
Mr. Tegland has served as Construction Inspector, Observer, or Field Technician on the following projects:
• 2022-2023 Pavement Rehabilitation Project, Goleta, California • CA SR 166 (West Main St.) and Blosser Road Right Turn Lane and Signal Installation, Santa Maria, California
• Union Road-Golden Hill to Highway 46 East Project, Paso Robles, California • 2022 Paving Project, Pismo Beach, California
• Bluff Stabilization and Sea Walls, Pismo Beach, California • Price Canyon Road Slope Repair, Pismo Beach, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 42 Professional Certifications
• OSHA Confined Space Entry
• Excavation and Trenching
Competent Person
• Caltrans Lane Closure
System Training
• Caltrans Certified Flagger
• First Aid/CPR
• PROCORE Certificate No:
2wesoae92foc
Education
• Associate of Science,
Architectural Design,
Pittsburgh Technical
Institute, Pittsburgh,
Pennsylvania
Software Skills
• PROCORE
• AutoCAD
• Civil 3D
• Microsoft Suite
Mr. Campbell brings more than 15 years of experience as a Construction Project Manager and Inspector for heavy civil engineering projects and construction firms.

He has successfully overseen projects and undertaken responsibilities in providing field inspections and observations, design, and project management related to water conveyance systems, including pipelines and canals; groundwater wells; recharge ponds; reservoirs; ground water filtration system; sewer systems and lift stations, storm drains; grading and drainage; and roads, streetscapes, parking lots, and railroads.

He has worked with numerous agencies, municipalities, and private sector clients throughout Central California on residential and commercial land development, public infrastructure, energy industry, and transportation projects for agencies such as City of Bakersfield, and Arvin Edison Water Storage District. He is thoroughly familiar with construction contract administration and scheduling, coordination of utilities, materials and soils testing, and client and stakeholder needs, effectively serving as on-site Owner’s Representative.

Measure K-14 Street Repair and Rehabilitation Program Projects, Grover Beach, California: Cannon was selected by the City to provide construction management and inspection services for improvements including roadway reconstruction, HMA paving work using Section 39 of the Caltrans Standard Specifications, ADA compliance, implementation of water pollution control BMPs, and traffic control support to maintain easy access on critical residential streets. Mr. Campbell served as Project Inspector.

Select Project Experience Summary
Mr. Campbell has served as Construction Inspector or Assistant Resident Engineer on the following projects:
• 2023 Pavement Rehabilitation Projects, Atascadero, California • 2020-2021 Pavement Rehabilitation Project, Goleta, California • 2021-2022 Pavement Rehabilitation Project, Goleta, California • 2022-2023 Pavement Rehabilitation, Pismo Beach, California • Pismo Beach Streetscape at Shell Beach Road, Pismo Beach, California • Mission Village – KB Homes Improvements, Santa Clarita Valley Water Agency, Valencia, California
• Airport Area Infrastructure Improvements, Paso Robles, California • Hwy. 68 Caltrans Encroachment Permit Inspection, Monterey, California • CA SR 166 (West Main St.) and Blosser Road Right Turn Lane and Signal Installation, Santa Maria, California
• Orcutt / Tank Farm Roundabout, San Luis Obispo, California • Hwy. 46 East Water Main Relocations, Lost Hill Utility District (LHUD), Lost Hills, California
• Calleguas-Las Virgenes Municipal Water District Interconnection Project, West Lake Village, California
Colin Campbell, CPII Construction Inspector
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 43 Christine C. Kahn, PE Caltrans Liaison / Assistant Resident Engineer Professional Registrations /
Certifications
• Civil Engineer, California,
No. 41877
• OSHA-Confined Space
Entry, No. 132326
• Asphalt 101 for Civil and
Geotechnical Engineers –
Asphalt Pavement Alliance
Education
• Bachelor of Science, Civil
Engineering, California
Polytechnic State
University, San Luis Obispo,
California
Professional Affiliations
• American Society of Civil
Engineers; Past President,
SLO Branch
• American Public Works
Association, Member,
Central Coast Chapter
Ms. Kahn is an experienced project manager, project engineer, and construction inspector with 34 years of experience in the public infrastructure field. She offers expertise in constructability reviews, preliminary site planning and permitting, and funding assistance. Throughout the course of her career, she has honed her abilities as an astute problem-solver capable of designing, managing, and inspecting transportation projects with proficiency.

As a Transportation Engineer for Caltrans, she was the lead engineer in the development of various complex transportation projects on the State Highway System. Ms. Kahn also managed a team of engineers to prepare technical documents that required extensive coordination with several functional units within the district, region, headquarters and outside regulatory agencies. She followed many of her projects into construction to oversee field personnel to confirm the cost effective and timely delivery of the project.

Train Station Expansion Project, Grover Beach, California: The City of Grover Beach successfully secured Federal funds from a Congestion Management Air Quality Grant for the City of Grover Beach Train Station Expansion Project. Additionally, the City received an allocation of grant funds for construction from State Proposition 1B and from the Regional Surface Transportation Program. The City selected Cannon to provide Construction Management and Construction Inspection, and Materials Engineering, Sampling and Testing for this project. Materials installed on the project and specific documentation and required reporting adhered to Caltrans Local Assistance Procedures Manual (LAPM) standards. Ms. Kahn provided Construction Management services.

Select Project Experience Summary
Ms. Kahn has served as Construction Inspector or Assistant Resident Engineer on the following projects:
• Blosser Road Right Turn Lane at W. Main Street, Santa Maria, California • 2021 Pavement Inspection Services, Guadalupe, California • Measure K-14 CIP, Grover Beach, California
• County of San Luis Obispo, Huasna Townsite Road Bridge Rehabilitation, Oak Shores, California
• County of SLO 2023 Storm Damage Repair Work, San Luis Obispo, California • Pismo Pier and Plaza Rehabilitation, City of Pismo Beach, California • 4th Street Phase 2, Santa Monica, California
• CDBG-Funded Community Center and Leroy Park Guadalupe, California • Vintage Ranch Development Project Inspection Services, Orcutt, California Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 44 Marcia Bohac Office Engineer
Education
• Bachelor of Science, Human
Factors Engineering, Tufts
University, Medford,
Massachusetts
Ms. Bohac brings 25 years of experience in administrative positions for various industries. She is responsible for business services support, including contracts for both public and private entities and agencies. Ms. Bohac demonstrates effective teamwork, communication, and management. She prepares project reports and reviews and references drawings. She has experience analyzing and compiling pay applications and change orders. She has transferred RFIs and submittals to database platforms for client and team accessibility. Her specialty is streamlining processes and procedures to bring more efficiency to the work.

Tank Farm and Orcutt Roundabout Improvements, San Luis Obispo, California:

To improve traffic flow and safety at a critical intersection, this project included drainage improvements; overhead utility undergrounding; utility relocations and extensions; accessibility compliant sidewalks, ramps, and crosswalks; multi-modal improvements; traveled way realignment; new pavement, striping, markings, and signage; and numerous aesthetic enhancements. Cannon provided construction management, inspection, and materials testing for this project. Ms. Bohac served as Office Engineer.

Golden Hill Road and Union Road Roundabout, Paso Robles, California: To eliminate the need for extensive property acquisition, a one lane, dog bone-shaped roundabout was designed to accommodate the increased traffic demand, including accommodations for oversized nine-axle transports. Cannon provided construction management, inspection, construction staking, and materials testing. The scope of work included full depth reclamation, installing new waterlines, sewer, fiber conduits, streetlights, landscaping, curbs, gutters, sidewalks, and roadwork, and signage and striping. Ms. Bohac served as Office Engineer.

Select Project Experience Summary
Ms. Bohac has served as Office Engineer or Business Services Administrator on the following projects:
• County of San Luis Obispo, Huasna Townsite Road Bridge Rehabilitation, Oak Shores, California
• County of San Luis Obispo 2023 Storm Damage Repair Work, San Luis Obispo, California
• Ocean Boulevard Improvements, Pismo Beach, California • Arterials 2023 Project, San Luis Obispo, California
• 2022 Paving Project, Pismo Beach, California
• Well 29 Rehabilitation Improvements Project, Santa Ana, California • CIP 2021, Huntington Park, California
• Budlong and Halldale Street Improvements, Gardena, California • Monterey Park Pass Road Transmission Main Replacement, Monterey Park, California
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 City of Gardena, On-Call CM & Inspection Services Cannon 45 Education
• BS, Business
Management, University
of Phoenix, Arizona
Megan LeNoue Public Outreach and Grant Writing
Ms. LeNoue has 10 years of experience in administrative and municipal program services and contract administration. Her overall experience includes grant research and writing, funding administration, project management and analysis, community outreach support, labor compliance monitoring, and construction management assistance.

As a Program Manager, Ms. LeNoue has served as a liaison to provide support on various projects. One of her main responsibilities is assisting clients with preparing and administering programs as required by federal and state funding agencies to ensure projects are developed in accordance with policy and procedural guidelines. Ms. LeNoue is proficient in preparing funding reimbursement requests and quarterly reporting through various agencies (FHWA, Metro, Caltrans, CalOES) for various multi-million-dollar projects.

Summary of Select Project Experience
Mr. LeNoue has written many grants, including:
• Bridge Investment Program
• CDBG-CV Homekey
• Clean CA Local Grant Cycle 1-2
• Equitable Community Revitalization Grant
• Active Transportation Program Cycles 1-6
• Safe Streets and Roads for AllO Call for Projects
Professional Registration
• Registered Civil Engineer,
California, No. CE 34996
• Registered Geotechnical
Engineer, California, No.

GE 2030
Education
• BS, Civil Engineering,
Cal State University,
Northridge, California
John Leuer, CE, PE Geotechnical Engineer
Mr. Leuer has over 35 years of professional experience in the geotechnical and civil engineering field. In this time, Mr. Leuer has developed an extensive knowledge of the many geotechnical considerations involved in construction in the southern California area. Mr. Leuer is highly experienced in all aspects of soil and foundation engineering for a wide variety of projects ranging from multi-story commercial and industrial structures to several thousand acre planned community developments. Mr. Leuer has substantial experience coordinating projects for many City, County, and State agencies as well as in the public sector, gaining a reputation for being responsive to clients needs while providing strong technical expertise.

Summary of Select Project Experience
Mr. Leuer was the Project Manager on the following projects:
• On-Call Compaction Testing and Materials Testing Services Provided During Construction, 2023 Citywide Pavement Rehabilitation Services, Perris, California • On-Call Geotechnical Observation, Compaction Testing, and Materials Testing Services Provided During Construction, Moreno Valley, California • On-Call Geotechnical, Compaction Testing, and Materials Testing Services Provided During Construction, Auto Center Drive Pavement Rehabilitation Project, Lake Elsinore, California
Cannon’s Subconsultants
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Cannon
16842 Von Karman Ave., Suite 150
Irvine, CA 92606
949.753.8111
Reliable
Responsive
Solutions
Docusign Envelope ID: 8B9E978A-4A08-4E9E-8D47-FB8CE881C124 Consultant Agreement with David Evans and Associates, Inc Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH

DAVID EVANS AND ASSOCIATES, INC
This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena, a municipal corporation (“City”) and David Evans and Associates, Inc, a OR Corporation (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Traffic Engineering

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 2 in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RFQ, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person promptly upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain the level of competency presently maintained by other similar practitioners in the State of California practicing under similar circumstances, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 3

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 4 indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Liability Insurance – a policy with minimum limits of One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said Professional liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 5

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by certificates of insurance to the policies:
a. Additional insureds (applicable to commercial general and automobile liability policies only): “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to:
liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced to no longer meet the requirements of this Agreement, until thirty (30) days after written notice is given to City.”
c. Other insurance (applicable to commercial general and automobile liability policies only): “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfinsured retentions with respect to City, its officers, employees, agents and Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 6 volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City which may be redacted at the Consultant’s or the Consultant’s insurers’ discretion to protect confidential or proprietary elements of the policies.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to indemnify, hold free and harmless including the cost to defend the City, it elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the negligent performance of the Consultant its employees, and/ or authorized subcontractors, of the work undertaken pursuant to this Agreement. Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints, or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited to the extent required by Civil Code Section 2782.8, to claims that arise out of, or pertain to, or relate to the negligence, recklessness, or misconduct of Consultant. The City agrees that in no event shall the cost to defend charged to the Consultant exceed the Consultant's professional proportionate percentage of fault.

This provision shall supersede and replace all other indemnity provisions contained in either the City’s specifications or Consultant’s proposal, which shall be of no force and effect.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 7

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 8

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence as it would its own similar information but in no event use less than reasonable care and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law, rule, regulation, court order or governmental investigation. Consultant agrees to release such information or material only to employees or Sub-consultants who have agreed to keep the information confidential in accordance with this Agreement and signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement reasonable safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 9 information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including reasonable attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 10 origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the reasonable control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer
To Consultant: David Evans and Associates, Inc
201 South Figueroa Street, Suite 240
Los Angeles, CA 90012
Attn: James Daisa
Title: Project Manager
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall promptly inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 11 not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations in force during the Services;
C. Any additional records deemed necessary by City to assume verification of compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the substantially prevailing party in the legal action shall be Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 12 entitled to recover reasonable attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with David Evans and Associates, Inc Page 13 IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – David Evans
and Associates, Inc
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Aaron Fetzer
Chief Financial Officer
Vice President, Construction Engineering Svcs
Alex Soo
Exhibit A
Request for Qualifications (RFQ)
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12

CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

REQUEST FOR QUALIFICATIONS (RFQ)
FOR

GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION

MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,

ARCHITECTURE AND LANDSCAPE ARCHITECTURE,

GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL

TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:

MAY 2024
Memoranda:

Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.

City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12

TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A” Gardena Standard Professional Services Agreement…………….……………… 10 Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 1 | Page

SECTION I

NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services NOTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on-call services related to our Public Works Capital Improvement Program and General Engineering. The work will be assigned on an as-needed basis for various projects in the City.

The Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.

The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/ Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217-9643 or [email protected].

BACKGROUND
The City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council-Manager form of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built-out, with a few remaining undeveloped parcels and a 9.4-acre wetland preserve, Gardena Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.

The Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.

The existing city-owned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City discharge to the LACSD interceptor at over 100 locations.

The existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).

The collection system pipes within the City primarily discharge to the Dominguez Channel.

Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.

The City has six (6) parks with community buildings, two gymnasiums, and a parkette. Additionally, the Gardena Wetland Preserve is situated next to Johnson Park. The City is currently constructing a new pool and senior center community center. Furthermore, the newly acquired Chase Bank Building on Rosecrans Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 2 | Page
Boulevard is slated to become a new Community Center, and Mas Fukai Park is in the construction document phase for improvements.

SUBMITTAL DEADLINE
Complete proposal/Statement of Qualification must be submitted no later than Thursday, June 13, 2024, at 2:00 p.m. PST. Three (3) hard copies and one complete PDF copy (on CD or memory stick) shall be address to:

City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, Assistant Public Works Director
The City currently anticipates conducting the selection process according to the following schedule, which is subject to revision. The City reserves the right to modify the schedule as needed.

May 9, 2024 RFQ Released
June 3, 2024 RFI Deadline
June 13, 2024 Proposal/SOQ Deadline
July 9, 2024 Staff Short List Selection
July 23, 2024 City Council Review/Approval
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 3 | Page

SECTION II

SCOPE OF SERVICES/SCOPE OF WORK
The City of Gardena would like the selected firms to provide professional on-call engineering, architecture, and/or landscape architecture services (including Construction Documents, PS&E, technical memoranda, research studies, plan checks, testing, etc.) for City projects to support the Public Works Department. The City intends to select between three and five (3-5) consultants for each respective service category, with the exception of only one or two consultants for Geotechnical Engineering/Geology/Material testing.

However, the actual number of consultants selected may be subject to change based on the number of responses and qualifications.

The award agreements are to provide on-call services for a period of three (3) years. The agreements may be renewed at the City’s discretion for up to two (2) additional years, subject to satisfactory performance during the initial three-year term. The initial three-year term is anticipated to commence in September 2024 and end in September 2027. The City encourages firms to submit qualifications for any or all parts of the key services listed below to be eligible for placement on the qualified on-call/as-needed list for each service category separately.

At the City’s discretion, selected firms will be assigned projects based on their qualifications in relation to the project(s) scope of work, or requested to submit a proposal, on an as-needed basis for various projects in the city. The City does not guarantee that successful firms will be provided with any projects.

MINIMUM QUALIFICATIONS
Only those consultants with verifiable experience related to the services requested in this solicitation will be considered during the evaluation process. Consultant staff assigned to execute the scope of services must have relevant experience in providing the necessary services as described in the scope. All personnel assigned to the work must possess appropriate certification or registration as required by state and local agencies.

SCOPE OF WORK
Selected firms will report to and operate under the direction of the City of Gardena Public Works staff to provide professional engineering, architecture, and/or landscape architecture services to the City. In general, the selected consultants will be expected to provide services and staffing for the following categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
Consultants may submit qualifications for one or more of the service categories requested; however, separate proposals and letter of transmittals must be submitted for each category.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 4 | Page

GENERAL CIVIL ENGINEERING DESIGN
Provide complete design services for Capital Improvement Program projects. Example services include, but not limited to:
• Plan preparation for street improvements, repair, rehabilitation, or other related street improvements.
• Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
• Preparation of hydrology and hydraulic analysis and reports. • Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. • Geotechnic engineering and material testing as needed. • Preparation of project technical provisions.
• Preparation of detailed cost estimates.
• Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. • Provide design and construction surveys.
• Provide construction assistance.
• Coordination with, and approvals from other permitting agencies and utility companies.

CONSTRUCTION MANAGEMENT AND INSPECTION
Provide complete construction management and inspection services for CIP, including park renovations, and facility construction/ modifications/ modernizations. Including, but not limited to:
• Coordinate and lead project construction meetings.
• Lead all meetings during the construction from pre-construction to final closeout. • Provide and maintain project files/documents per City template. • Provide and supervise construction observations/inspections for CIP projects such as streets, sewer, storm drain, parks and facilities.
• Provide construction inspection services in grading, street improvements, drainage, SWPPP/erosion control, paving, sewer, water, and franchise utilities. • Provide public contract administration (i.e. CCO, Daily logs/report, Weekley Statements, Notices, labor compliance/enforcement).
• Provide utility company coordination.
• Provide labor compliance/enforcement as needed.
• Assure contractor to maintain a set of as-built plans. • Schedule the final walk-through inspections and prepare a “punch-list”. • Collect and review the Certified Payrolls as needed.
• Assume contractor to obtain all necessary permits.
• Provide constructability review, quantity take-off and cost estimates as needed.

TRAFFIC ENGINEERING
Provide traffic design engineering and/or study/analysis services for signal and signing, striping, grant writing, and all related services, including but not limited to:
• Improvements associated with traffic signal design.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 5 | Page
• Preparation of signing, striping, signal modifications, detour, and traffic control design • Preparation of special traffic studies
• Conducting signal synchronization studies (before and after synchronization travel time), utilizing HCM method for LOS, as well as Los Angeles County standards.

ARCHITECTURE AND/OR LANDSCAPE ARCHITECTURE
Provide architecture and/or landscape architecture professionally services for public facilities. Including, but not limited to:
• Provide conceptual design, master plan, feasibilities study and envelope evaluations. • Renovation and/or expansion of existing public facilities. • Preparation of landscape/planting plans and irrigation. • Parking lot and hardscapes improvements.
• Playground layout and play structure design/upgrade.
• Preparation of project special provisions and technical specifications • Provide cost estimates.
• Provide constructability review and construction support.

GEOTECHNICAL ENGINEERING, GEOLOGY AND MATERIAL TESTING
Provide complete design, construction, or assistance services for City improvement projects and/or investigations. Services include, but are not limited to:
• Complete soils investigation and preparation of Geotechnical Engineering reports and studies, such as pavement design, grading requirements, retaining wall parameters, slope stability analysis, sinkhole/voids investigation and analysis, etc. • Laboratory work related to all aspects of Geotechnical Engineering. • Provide construction inspection for items such as asphalt concrete, aggregate base, and concrete placement during construction, grading excavation, and backfill. • Provide testing services such as field compaction and laboratory testing of soils, aggregates, asphalt, and concrete.

STAFF AUGMENTATION SERVICES (Firms may submit only for positions or service they provide.) Provide qualified and available personnel to provide professional staff augmentation services and/or backfill various positions and classifications within the Engineering Division on short notice. Positions include but are not limited to: Engineer(s), Permit Technician(s), and Inspector(s) and perform duties as an “Acting” City representative. Positions may require personnel reporting to City offices.

Immediately the City plans to augment one (1) Associate, Civil, or Senior Civil Engineer based on the qualification and best fit for the City. Other categories of augmentation services are not currently needed, however will be requested as needed.

Sample duties include, but not limited to:
• Engineer(s) general requirements (Identify an Engineer with resume and proposed classification; Associate, Civil, or Senior Civil Engineer) - Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 6 | Page
o Able to work minimum 20 hours per week or more. The City is open to accepting fulltime services as well. o Perform mathematical computations and estimates.
o Simultaneously handle several tasks and continue to reestablish priorities. o Communicate clearly and concisely with others, orally and in writing. o Ability to establish and maintain effective team relationships with all internal and external customers.
o Able to operate Microsoft Office and AutoCAD.
o Able to perform in indoor and outdoor environments with exposure to the elements. o May be required to pass a security/background check and a drug test prior before providing any services to the City.
o Must maintain a valid California Drive License.
o You may be required to work more than 40 hours a week and/or work irregular hours, particularly during emergency situations.
o Typical working hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. or 9/80 schedule from 7:30 a.m. to 5:30 p.m.
o Civil and Senior Engineer positions require a California Professional Civil Engineering license.
o May be required to arrange for the City to interview a candidate, at the Consultant’s expense, for a period of up to one (1) hour.

Typical Responsibilities – The staff will be under general direction of Engineering Division Manager, performing and overseeing various CIP projects from preliminary design to final construction. Examples of duties and responsibilities are as follow:
o Prepares RFP/RFQ for design and Construction Management and Inspection (CMI) services.
o Prepares and/or oversees design Plans, Specifications, & Estimates (PS&E). o Prepares and leads project bid processing, writes council agenda report, and executes contract.
o Oversees CMI services.
o Prepares Caltrans required submittals and coordinates review process (i.e. PES, E76 o and Contract award packages).
o Performs minor drafting, computing, and checking field operations as related to the layout and construction of pavement, curbs, gutters, sidewalk, traffic, utilities and other CIP.
o Performs LA Metro required project reporting, reimbursement process, etc. o Interprets and applies GREENBOOK, Caltrans Standards, City Standards, and other laws and regulations relating to CIP projects.
• Provide Permit Technicians to assist public at Engineering public counter (Not required to identify personnel at this time).
• Provide Construction Inspection services (Not required to identify personnel at this time), such as:
o CIP projects such as street rehabilitation; sewer or storm drain improvements, facility modifications and improvements; park rehabilitation and improvements. o Private development including paving, utilities, sewer, storm drains, paving, etc. o Repairs and improvements by private utility companies.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 7 | Page

SECTION III

SUBMITTAL REQUIREMENTS
The Proposal package shall be organized and presented in a neat and logical format relevant to the services requested. Submittals shall be clear, accurate, concise, and comprehensive. There is no page limitation, however, excessive, or irrelevant material will not be favorably received.

The Proposal should be in the order below and include the following:
• Cover
• Cover Letter
o Clearly indicate the on-call service category.
o Express why Consultant is interested in the RFQ.
o Include contact information for the person responsible for the Proposal and who will be the point of contract for the City.
o Include any unique attributes or distinguishing characteristics which would be of value to the City.
o State if any addendums have been received and include in the Proposal. o Statement regarding acceptance of Agreement and insurance requirements. o Letter shall be signed by an officer of the firm who is authorized to bind the firm to the contract. Include a statement to this effect.
• Firm Qualifications and Experience
o Describe firm’s background and experience.
o Describe your firm’s strengths.
o State how your firm produces deliverables free of errors and how you will address erros if they occur.
o Include experience and technical competence of subconsultants. o Familiarity of regional grants/competitive funds (SBCCOG & LA Metro) • Key Personnel and Experience
o Experience and history performing directly for local agencies within the last five years. o Include subconsultants if any.
• Organization Chart
• Similar Projects/Services
o Brief description of the project scope, personnel involved and their roles, plus agency and contact information of agency Project Manager/Engineer. o Projects that the firm was the prime consultant and responsible for management of any subconsultants.
• References
o Current contact information related to projects completed within the last five years. • Fee Schedule
• Resumes
Note: All licensed professionals in 'responsible charge' working on City projects (Engineers, Architects, Landscape Architects, and/or Surveyors) are required to disclose all disciplinary actions against them, including any future actions. Please provide a copy of any disciplinary actions with the proposal submission. Additionally, provide a statement if there are no disciplinary actions.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 8 | Page

SECTION IV

FEE SCHEDULE
A fee schedule should be included in the Proposal. This schedule should comprise a comprehensive list of positions and labor rates for all services provided by the prime consultant and all subconsultants. Rates should cover all necessary resources, including labor, equipment, materials, incidental reports, transportation, etc. Any percentage markup of subconsultant invoices shall be specified.

The fee schedule should remain fixed throughout the initial term of the Agreement unless formally amended by the City Council. Adjustment of the fee schedule can be negotiated if the City renews the Agreement.

The City is subject to prevailing wage laws, which apply to professional service providers and their subconsultants for whom the Department of Industrial Relations has established a wage determination.

This includes, but is not limited to, Field Soils Materials Testers, Operating Engineers, Surveyors, and Building/Construction and Specialty Inspectors.

Prevailing wage requirements apply when a Consultant and/or Consultant Team is awarded a contract for a specific project, which is designated by the issuance of a City Purchase Order.

SECTION V

SELECTION/EVALUATION CRITERIA
The Proposals will be evaluated by City of Gardena Public Works Department staff. The evaluation criteria will include:
• Presentation, completeness, clarity, organization, and conformance to the RFQ content. • Project Manager’s experience related to the City’s requirements and needs. • Familiarity/Experience related to the South Bay Cities Council of Governments (SBCCOG), Los Angeles County Metropolitan Transportation Authority (Metro), and Caltrans project programs, funding opportunities, grant writing, and their requirements. • Qualifications and resumes of staff members, subconsultants, and organization chart. • Similarity of the firm’s referenced projects completed within the last five years to the City’s expected projects.
• Availability and depth of staff and resources to deliver quality products on schedule, including work on short notice and under time constraints.
• References.
• Fee schedule.

During the evaluation period, the City may conduct negotiations with the most qualified consultants.

However, consultants should note that an award may be made without negotiations or discussions.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 9 | Page

SECTION VI

GENERAL CONDITIONS
By submitting a Proposal, the Consultant represents that they have thoroughly examined and become familiar with the requirements of this RFQ and are capable of performing quality work to achieve the objectives of the City.

The City reserves the right to withdraw the RFQ at any time without prior notice. The City makes no representations that any Agreement will be awarded to any Consultant responding to this RFQ. The City reserves the right to extend the deadline for Proposals, postpone reviewing the Proposals for its own convenience, reject any and all Proposals without indicating any reasons for such rejections, and negotiate with any qualified consultant. The City does not guarantee that successful firms will be provided with any projects.

The successful consultant(s) and sub-consultants are required to obtain and maintain a City of Gardena business license and insurance. The license and insurance shall be maintained for the duration of the Agreement. A current business license is not a prerequisite for submittal of the qualifications.

The City is not liable for any costs incurred by the Proposers before entering into a formal agreement.

Costs for developing the Proposal or any other such expenses incurred by the Proposer in responding to this RFQ and entirely the responsibility of the Proposer and shall not be reimbursed by the City.

The City is not responsible for Proposals which are delinquent, lost, incorrectly marked, sent to the wrong address, or sent by mail or courier service and not signed for by the City.

SECTION VII

AGREEMENT AND INSURANCE
The City’s standard Professional Services Agreement is included in Appendix A. The Consultant will be expected to enter into the Agreement without substantive changes. Any changes will require approval by the City Attorney. If there are any exceptions or if there are no exceptions, a statement to the effect shall be included in the proposal as well.

The City’s standard insurance requirements are included as part of the standard Professional Services Agreement included in Appendix A. The consultant shall procure and maintain throughout the duration of this Agreement.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 10 | Page

SECTION VIII
APPENDIX “A”
Gardena Standard Professional Services Agreement
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH XYZ
This Agreement is entered into this day of , 2024,
by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 3

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee proposal hereto and incorporated herein by reference. In no event shall compensation under this Agreement exceed _____________and 00/00 ($###.##) without the prior written authorization of the City Council.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 4
extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 5
shall be issued by an insurance company which is admitted to do business in the State of California.

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfDocusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 7
the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 8
paid by City for employer contribution and/or employee contributions for PERS benefits.

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 9
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 10
Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works
To Consultant: XYZ
Address
XXXX, CA #####
Attn: Name
Tittle
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 11
own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 12

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 13
other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – XYZ
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 2024 City of Gardena RFQ On-Call Professional Services
JUNE 4, 2024

RFQ FOR ON-CALL PROFESSIONAL SERVICES
ADDENDUM 01
TO: ALL RFQ HOLDERS
ADDENDUM NO. 1, AS DESCRIBED BELOW, IS FOR THE USE OF CONSULTANTS SUBMITTING THE STATEMENT OF QUALIFICATIONS OR RESPONSES TO THE CITY’S REQUEST FOR QUALIFICATIONS. ALL

CONSULTANTS SHALL INDICATE ON THE STATEMENT/PROPOSAL COVER LETTER THAT THEY HAVE RECEIVED THIS ADDENDUM NO. 1.

QUESTIONS & RESPONSES:

1. In regard to the subject RFQ Scope of Work for General Civil Engineering Design as shown on page 4, can you please confirm if the City would like us to include Geotechnical services as part of the Civil component as stated, since there is also a separate RFQ category for Geotechnical service on page 5? No, please submit a separate statement of qualifications if your firm is interested in providing services in the category of Geotechnical Engineering, Geology, and Material Testing. This category is intended for direct geotechnical services for the City. For General Civil Engineering Design, it is expected that the lead consultant will team up with your desired geotechnical consultant or your own qualified staff as needed to provide complete PS&E construction documents.

2. Can firms be both a prime consultant and a sub-consultant to another team in the same or different service category?
Yes, firms can be both.

3. Will the City allow the usage of the City’s logo in the proposal materials? Yes, the City will allow the usage of the logo.

4. Can you specify how “Associate, Civil, and Senior Civil” Engineers are classified? Is it based on number of years of experience or other criteria?
You may reference the City of Gardena’s job specifications as your minimum guideline:
https://www.governmentjobs.com/careers/cityofgardena/classspecs. The specifications for the Senior Civil Engineer position have not been developed. Therefore, assume that the job responsibilities are similar to those of a Civil Engineer, but require a minimum of 8 years of experience, including managerial experience. As mentioned, these specifications are minimal guidelines and consultants are encouraged to propose additional qualifications or experience to provide a competitive proposal.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 2024 City of Gardena RFQ On-Call Professional Services

5. Can you please confirm if firms are able to just submit a proposal for the geotechnical engineering/geology and material testing services or require having a team with a construction management company in order to pursue this?
Yes, you may just submit a proposal/statement for the geotechnical/geology and material services.

6. Do you anticipate consultants to support and prepare grant applications? The City may request services under General Civil Engineering, Traffic Engineering, Architecture and/or Landscape Architecture as applicable.

7. You are requesting references in the Similar Projects/Services and the References sections. Can you please clarify what information you would like in each section since both sections are asking for client contact information?
The information can overlap; however, Similar Projects/Services should identify specific projects with scope descriptions, key personnel and their roles, project dates, etc., as mentioned in the RFQ. The Reference Section should identify the current contact agency, person, phone number, and email so the reviewer can perform the reference check if necessary.

END OF ADDENDUM 01
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Exhibit B
Statement of Qualifications (SOQ)
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Professional On-Call Civil Engineering
Design Services
June 13, 2024
Qualifications to Provide
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 1
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

TABLE OF CONTENTS
Section Description Page

1. Cover Letter

2. Firm Qualifications and Experience................................. 3 Firm Background and Experience....................................... 3 Firm Strengths .................................................................... 3 Quality Assurance / Quality Control .................................... 10 Project Team Subconsultants ............................................. 11 Familiarity of Regional Grants / Competitive Funds............ 12

3. Key Personnel and Experience ....................................... 14 List of Contracts with Other Local Agencies ....................... 14 Staff Qualifications .............................................................. 15

4. Organizational Chart........................................................ 17

5. Similar Projects/Services................................................. 18

6. References ...................................................................... 25

7. Fee Schedule .................................................................. 26

8. Resumes ...................................................................... 30 Appendix. Agreement Exceptions
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 201 S. Figueroa Street, Suite 240 Los Angeles, CA 90012 T: 213.337.3680 F: 213.337.3679 June 13, 2024
Kevin Kwak, Assistant Public Works Director
Public Works Department
City of Gardena
1717 West 162nd Street
Gardena, CA 90247-3778
RE: QUALIFICATIONS TO PROVIDE PROFESSIONAL ON-CALL

GENERAL CIVIL ENGINEERING DESIGN
Dear Mr. Kwak:

David Evans and Associates, Inc. (DEA), an Oregon corporation founded in 1976, is pleased to respond with our qualifications to the request for As Needed Professional Engineering Services. Our team looks forward to building a partnership with the City of Gardena (City); we have a common goal of providing design solutions that are economical, feasible, and can be procured with an expedited schedule for successful delivery. ■ Understanding: DEA’s team understands the demands of on-call contracts and will provide seamless integration with the City to select the best possible team for each assignment, with consideration given to experience, capability, flexibility, and past working relationships and availability. DEA's approach to resources will offer flexibilty to match the City's needs and schedules.
■ Team Experience: The DEA team, including our sub-consultants, have decades of experience in the technical areas of the identified design tasks, local experience to deliver projects for public agencies similar to the City, and decades of project management experience using project delivery tools to track and monitor cost, schedule and quality. Our task leaders are well trained on the process to deliver projects, and our quality control manager will clearly set out the quality requirements based on City standards. We have assigned Steven Anderson, PE, PMP to be the Contract Manager. Furthermore, our team has a large set of in-house resources to deliver tasks, which will reduce time (through coordination and communication) and expense to be reliable under this contract. The sub-consultants that we have selected to be a part of the DEA team will provide support services to the design category. ■ Approach: Through the years, DEA has been able to successfully deliver projects. Our team members have extensive project experience with municipalities and a strong understanding of requirements having serviced 70 cities through on-call contracts. These same team members will be involved with the quality references you can check for this contract.
■ Detail Focused: Our attention to the little things sets us apart. We develop checklists, review elements of a deliverable, and are comprehensive in our cross-coordination and quality procedures with disciplines to make sure every submittal reduces review time and keeps the project on schedule.

We understand that the contract provided with the RFP is a sample and not intended to represent the final agreement between the City and the consultants for this on-call contract. When the time comes for negotiations, we have some suggested language changes that are very similar to the changes proposed and accepted by similar agencies. We have included these in the Appendix. We acknowledge receipt of Addendum No. 1 issued on June 4, 2023.

We thank you again for your consideration of our qualifications and look forward to the next step in the selection process.

I am the main point of contact with legal authority to commit the firm under this contract. Please feel free to contact me at 714.665.4554 or via email at [email protected] if you have any questions or need additional information.

Sincerely,
DAVID EVANS AND ASSOCIATES, INC.

Steven Anderson, PE, PMP
Contract Manager
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 3
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 2. FIRM QUALIFICATIONS AND EXPERIENCE

FIRM BACKGROUND AND EXPERIENCE
Since its founding in 1976 in Portland, Oregon, DEA has become a recognized leader for progressive and sustainable design and management solutions for complex transportation, traffic, transit, structures, and roadway improvement projects nationwide. DEA’s multi-disciplinary teams partner with clients to tailor solutions to meet the unique needs of each project. We have 28 offices in 10 states and employ approximately 900 people firm-wide. DEA staff includes professional engineers, surveyors, planners, landscape architects, and natural resources scientists. We are an employee-owned corporation and consistently rank among ENR’s Top 100 Pure Design firms in the U.S. DEA staff are committed to improving the quality of life, while demonstrating stewardship of the built and natural environments.

DEA recognizes the importance of building a deep pool of diverse expertise in the local market. We take this responsibility seriously and have a long and well-established reputation of building significant relationships with numerous consultants in the region and nationwide.

DEA has a proven track record of successfully providing on-call professional services to municipalities throughout Southern California. DEA has worked with numerous public agencies on various on-call contracts including:
■ Anaheim
■ Azusa
■ Baldwin Park
■ Banning
■ Barstow
■ Brea
■ Burbank
■ Carlsbad
■ Cathedral City
■ Chino
■ Chino Hills
■ Claremont
■ Costa Mesa
■ County of Orange
■ Huntington Park
■ Colton
■ Corona
■ Covina
■ Diamond Bar
■ El Monte
■ Fontana
■ Glendale
■ Glendora
■ Hesperia
■ Indian Wells
■ Indio
■ Irvine
■ LA Metro
■ La Puente
■ La Quinta
■ Laguna Niguel
■ Laguna Woods
■ Lake Elsinore
■ Lawndale
■ Lomita
■ Long Beach
■ Los Angeles
■ Montclair
■ Montebello
■ Moreno Valley
■ Murrieta
■ Newport Beach
■ Oceanside
■ Ontario
■ Palm Desert
■ Palm Springs
■ Pasadena
■ Perris
■ Pomona
■ Rancho Mirage
■ RCTC
■ Rialto
■ Riverside
■ Rosemead
■ San Bernardino
■ San Diego
■ San Gabriel
■ San Jacinto
■ Santa Ana
■ Santa Clarita
■ SBCTA
■ Simi Valley
■ South El Monte
■ Temecula
■ Temple City
■ Upland
■ Ventura
■ Victorville
■ Walnut
■ West Covina
■ Wrightwood
■ Yorba Linda
■ Yucaipa

FIRM STRENGTHS
DEA understands that on call contracts provide the City an opportunity for our team to work as an extension of the staff and build a relationship as a teaming partner. DEA has contracted with numerous Southern California municipalities for on-call services contracts. We have found the working relationships we build with city staff are beneficial to meeting schedules and agency requirements with a minimum amount of time spent on contracting issues. Because we regularly monitor project requirements and adjust project scheduling weekly, we can maximize availability of our key project staff as needs arise.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 4
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
DEA is committed to the City of Gardena (City) in providing our project deliverables that address the City’s needs as identified during the initial scope preparation. DEA will provide the following services for this on-call contract: General Civil Engineering Design

SERVICES
DEA has executed a number of on-call contracts with other agencies throughout the years, beginning with the planning and grant application stage through to final design and construction support. DEA has extensive experience in all aspects of the design of civil engineering projects, including street design, roadway widening, narrowing, rehabilitation, traffic design and signaling, alternative analysis, alignment and improvement plans, utility coordination and utility relocation, landscape architecture, hydrology, structural design, grading, survey, and street design. DEA provides a wide variety of multi-discipline services to both private and public clients.

Street Improvements, Repair, and Rehabilitation:

The approach to our street designs is tailored to the
needs of each project. Although the design services
are similar for street rehabilitations, reconstructions and widening projects, each project has specific
requirements based on many factors. DEA has
completed many street designs and brings our
knowledge of traffic impacts, business needs and
maintaining services along the roadways to our project
approaches. The scope of work will be adjusted to
provide the required services necessary to complete
the preliminary design and final design and
construction documents to the needs of the City.

Storm Drain and Drainage Design: At the planning
stage, the preliminary drainage analysis task is
performed to determine existing or project related
potential flooding, project impact to existing delineated floodways, modifications necessary to existing
drainage facilities to comply with the City’s
requirements to incorporate storm water treatment,
and to estimate associated project costs.

We will obtain available hydrologic and hydraulic
information from the County of Los Angeles and the
City as available. This may include the hydraulic
design parameters including latest as-built plans,
design discharge, design water surface elevation.

The existing drainage conditions will be reviewed. We will examine the existing drainage system and determine the impact the proposed build alternatives may have upon the system. Modifications, extensions, or replacement of the existing facilities may be necessary. We will indicate major impacts on the conceptual layouts. We will include appropriate costs for the drainage system revision into the cost estimates. A detailed hydrologic and hydraulic analysis of the existing and proposed system is not included in this scope of work as that would be prepared during the subsequent PS&E. The products of this task include preliminary estimates of required drainage improvements, cost estimates, and a conceptual drainage map.

Final Drainage: The basemap will be enhanced with data from the City and County to be used for the onsite hydrology and hydraulic studies and exhibits. Drainage areas will be delineated and field verified. Calculations will be based on existing and proposed roadway alignments. Hydrologic calculations will be prepared to determine the flows and flow patterns.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 5
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Onsite hydrology calculations will be made for the 10-year storm, 25-year event, 50-year storm event for sumps per the requirements of the City as needed for the particular project. An existing conditions drainage map will be prepared to be incorporated in the drainage report. Following the determination of flows in the hydrologic calculations, hydraulic calculations will be prepared to determine the adequacy of the existing drainage system, including existing inlets, pipes, and outlets. We will also review the existing runoff carrying capacity and flooding locations. Hydraulic calculations will be prepared for the existing system.

We shall prepare the drainage portion of the plans, specifications, and estimates (PS&E) plans set for the project following the design standards appropriate for the type of project and facility. Preparation of the PS&E plans set shall include, but not be limited to the preparation of the following drainage engineering related sheets including drainage plans, profiles, details, quantities, erosion control plans, and temporary water pollution control plans. Special provisions and quantity and cost estimates for drainage would also be prepared.

Water and Sewer Design: Work in existing streets, or
public right-of-way, requires knowledge of how utility
relocations are performed, familiarity with utility
companies, and agency requirements. The City will
benefit from DEA’s leadership in utility investigation, avoidance, relocation and coordination, and our
understanding of utilities on local transportation
projects.

Our team is very familiar with sewer relocation
strategies that mitigate impacts to existing flows and
capture lateral connections while maintaining a 10 foot clearance from potable water lines. In addition, we can design water line relocations that include proper corrosion protection, air release and mitigation to pressure due to unnecessary 90 degree bends. These plans will be modeled in Civil 3D for AutoCAD applications, and if necessary, modeled with existing utilities to verify there is a minimum 1 foot clearance (for constructability purposes) from any underground infrastructure. If a utility impact is unavoidable, we seek to minimize the impacts through creative construction staging, utility protection, value engineering and cost controls.

Hydrology and Hydraulic Analysis and Reports / WQMPS, SWPPPS, and NPDES Documents Hydrology and Drainage: As watershed experts, our team has extensive experience gathering and using any available hydrology data. We have compiled historic rain and flow gauge data available throughout various cities to support watershed model calibration efforts and characterize watershed conditions for reporting purposes. We have processed the rainfall data to utilize as inputs to watershed models, as well as analyzed the rainfall and flow data to characterize typical and critical conditions within the region.

Our engineers have extensive experience modeling major watersheds, from large, regional studies to more focused engineering design. We are well-versed in the dominant hydraulic, hydrologic, and water quality models of the County (LSPC, HydroCalc) as well as other commonly used models (SWMM, HEC-RAS, etc.). We can design these models so that we can offer our clients the most useful information they need to confidently plan their stormwater program.

Our approach to storm water management and design incorporates the latest county stormwater regulations to maintain compliance with NPDES for the jurisdiction. Our hydraulic calculations and designs manage flows for the drainage area and focus on mitigating flood impacts along with flush out velocities in order to reduce storm drain manholes. We have a long history working with the local flood control districts for connections and relocations of existing county storm drain infrastructure, and have extensive experience relocating stormwater without impacting hydraulic profiles for larger drains.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 6
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SWPPP: Our staff has extensive experience in NPDES compliance for public agency construction sites. Our staff includes personnel certified as Qualified SWPPP Practitioners (QSP), Qualified SWPPP Developers (QSD), and Qualified Industrial Storm Water Practitioners (QISP). In addition, we are well-versed in the State’s Standard Specifications, which outline specific requirements, based on the State Water Resources Control Board (SWRCB) Construction General Permit, for contractors to follow when implementing administrative procedures and the installation and maintenance of temporary Best Management Practices (BMPs).

Signal Designs and Striping Plans: DEA has
extensive experience in signing/striping and traffic
signal plans for projects. Our proven approach is to
collect existing (as-built) plan information, and to
obtain the project topographic, street improvement and
any other pertinent plans. We will compile the base
plan and then perform field reviews and field
inventories, open pullboxes and vaults, and document
existing conditions on the base plan. We will identify
issues that might impact the design, and will prepare
the traffic signal and signing/striping designs. Our
striping plans will integrate the current striping at the connecting points of the street with the agency’s
drafting standards and striping per the Manual on
Uniform Traffic Control Devices for Streets and
Highways.

Geotechnical Engineering: DEA's subconsultant
Earth Mechanics, Inc. analyzes the properties of earth
materials at a project site by conducting appropriate
field investigation and conducting laboratory testing.

Data from the field and the laboratory is used to
evaluate whether those materials meet the project
requirements. They provide recommendations for how
walls, roads, slopes and structures should be designed
based on the underlying soils or rock. EMI’s
engineering team routinely provides geotechnical
recommendations for design of foundations for various
structures such as buildings and bridges, retaining
walls, pipelines, pavements, and other structures. If needed, our team can provide ground improvement recommendations to meet the needs of the planned structures.

Construction Specifications: DEA will provide construction specifications for the material and construction requirements to be reproduced as required for the construction drawings. We will thoroughly review the specifications against the plans to ensure their coordination. Technical specifications will start with the City's Master Specification Library, the Green Book, and Caltrans, and customized as needed. Our database holds a large inventory of technical specifications which can be used as a template. General Conditions and General Requirements are usually standardized and pulled from the City’s library, and we can assist with setting up the contract documents as needed.

Engineer's Cost Estimate: We will provide an opinion of probable construction costs, including a detailed breakdown of work, unit prices, material and total costs, and will include references for chosen unit costs at each submittal. Typical agency line items such as mobilizations, permitting, construction management and contingency will be added to the estimate.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 7
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Land Surveying: The fundamental principles of
survey have remained virtually the same over time, the
technology employed continues to rapidly advance.

Using basic philosophies and applying the newest in
technology, DEA surveyors and geomatics specialists
take an integrated approach to blending the latest
tools with the historic past. From total stations to digital levels and GPS receivers to 3D laser scanners, DEA’s
surveying and geomatics team provide accurate,
dependable, and high-quality deliverables in a
resourceful and cost-effective manner.

In general, our day-to-day land surveying and mapping activities are as varied in scope as any potential work tasks. DEA is routinely involved with boundary, topographic, control and construction staking surveys. Along with the field survey effort, we are engaged with the office support duties of preparing construction staking notes, topographic maps, digital terrain models and survey reports. Our successes in the daily execution of work are based on experience and continuous active communication.

DEA’s team is staffed and fully equipped to provide land surveying services for construction staking and layout, geodetic and control surveys, topographic and quantity surveys, boundary surveys, and as value-added services we offer our in-house 3D laser scanning technology (consisting of static and mobile applications), and in-house hydrographic survey services.

Construction Support Services
Construction Meetings: At the request of the
construction management team, DEA can meet at any
site facility for discussions on submittals, RFIs, change orders and site conditions. Our team can develop
exhibits in preparation of any discussions with the
construction team.

RFIs and Submittal Review: Request for Information:

One of the key areas requiring swift response
and coordination is the contractor’s “Request for
Information” (RFI) documents. This is usually a request for design clarification or a correction of noted conflict in the drawings and/or specifications, and often has the potential for a claim. RFIs will receive the immediate attention of David Evan’s construction management team for a timely response, and will be a major component in claims avoidance.

RFIs will be received by DEA, logged into the document tracking system, and reviewed for completeness and format. Typically, our PM will respond to the RFIs related to the contract administration. The design-related RFIs will be sent to our design engineers. Then, all RFI responses can be logged in the City’s DTS system, reviewed for completeness, and returned to the contractor. A key objective is to avoid overdue responses and expedite them if they do occur.

DEA will keep the City informed of our management of the RFI process, provide a copy of the RFI Status Reports, and will discuss and assess our findings.

Shop Drawings and Material Submittals: To effectively manage the submittal and shop drawing process, DEA will create a master submittal log at the beginning of the project. DEA can provide support to the City, mandating for the contractor to reflect in their Baseline Schedule a tie for each submittal to each of the first activities in the CPM schedule that are dependent on the approval/procurement related to the submittal. This will assist the contractor to prioritize and manage the submittal process and minimize any delay to the project resulting from late submittal approval.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 8
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
DEA will coordinate the submittals from the contractor to the appropriate team member for their prompt review and approval, and forward all items requiring input from the City. If requested, DEA will use the DTS to prepare an overall submittal register, pending logs, late logs, and to generate reminder notices to the contractor as appropriate.

Providing As-Builts: “As-Built” Drawings: On a monthly basis if requested by the City, DEA will work with the construction manager to verify that as-built drawings are maintained by the contractors so that the actual work performed is accurately and comprehensively recorded. DEA will coordinate the construction manager to obtain the final as-built drawings from the contractor and update the design plans to reflect the final field conditions. Our team will stamp, sign and provide mylars if necessary.

Project Closeout Documents and Retention Release: The project managers will prepare closeout documents, including processing of all outstanding paperwork to attain final acceptance by the City for the design and observation services.

WORK APPROACH
Our approach for each specific task order proposal would be to first identify the appropriate team members to successfully accomplish the project. Each project is unique and as such we will develop a tailored scope of services / approach to satisfy the requirements. The approach would be to develop the project in close coordination with the City and the involved stakeholders.

Project
Management
Develop Task
Order Scope
Prepare Project
Management Plan
Status Reports to
Client/Invoicing
Review QC
Plan Status
Closeout Checklist/
File Transfers/
Final Invoice
Quality
Assurance

TASK ORDER APPROACH
PM & Technical Leads work together
throughout the task order process
Weekly meeting with
Technical Leads/Staffing Needs
Project
Execution
Project
Manager
Technical
Leads
Select Task
Order Team
Project
Initiation
QC Expectations
and Plan
Implement QC
Control Plan QC Checks
QC
Documentation
Annual Survey
Identify
QC Manager
Submittal &
Deliverables
Project
Closeout
Key aspects of our approach to on-call contracts include the following and are detailed below:
■ Task Order Development
■ Fee Proposal
■ Early Communication for Clear Expectations
■ Commitment of Staff
■ Notice-to-Proceed
■ Task Order Management
■ Monitoring Progress

TASK ORDER DEVELOPMENT
We anticipate that the first step in the on-call process will be the execution of a project specific task order. We recognize that this process is an extension of the proposal process, not directly billable to the project, and sometimes competitive with other on-call consultants. It is of high importance to both the City and DEA to develop the scope, fee, and schedule for task orders based on a clear understanding of the City’s needs and with clear expectations of the process and deliverables. DEA appreciates the opportunity to meet with staff in advance of this to obtain this information and ask for clarifications if needed. In this way, we will be able to propose an effective approach and complete task orders that achieve precisely what the City wants to receive.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 9
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

FEE PROPOSAL
The City’s project manager will issue a task order solicitation to DEA’s contract manager, Steven Anderson, together with schedule expectations and other related project information. Steven will work with the City’s project manager to complete the necessary task order documentation as follows:
■ Project objective
■ Scope of services
■ Deliverable products
■ Schedule of milestones and deliverables
■ Specific staffing requirements
■ Labor rates, hours, and budget (not-to-exceed)
■ Other direct expenses (if applicable)

EARLY COMMUNICATION FOR CLEAR EXPECTATIONS
Consistent communication is the cornerstone of a good working relationship between teaming partners.

The kick-off meeting establishes the stakeholders with input at each phase of the project. Communication plans can determine the frequency of meetings, how to correspond and who holds the lines of communication.

In addition, this can include document control aspects for sending and receiving information between teams.

COMMITMENT OF STAFF
During task order development, DEA’s management team will commit the specific technical team required to complete the project. Our southern California team uses a forward-looking scheduling process, specifically designed for responding to on-call work, and to assign staff for future work. The system is such that we are able to lock people into projects well in advance, thereby eliminating the potential for overcommitments, and assuring that the City’s schedule expectations will be met.

NOTICE-TO-PROCEED
The task order and cost proposal will be submitted to the City’s project manager, who will either initiate further discussion, or give approval to proceed. It is our intent to do a thorough job the first time so the needs for cycles of discussion/negotiation can be minimized.

TASK ORDER MANAGEMENT
Upon receipt of a task order notice-to-proceed, Steven will become the City’s point-of-contact for project execution and will work directly with the City’s project manager throughout the project execution phase.

He will manage the activities of DEA’s technical staff and be the principal technical expert to guide the project.

MONITORING PROGRESS
DEA task leaders are required to carefully monitor the progress of their projects to assure that staff resources are available as required and to make sure that the City’s overall budget and schedule expectations are being met or exceeded. Each week Steven holds a weekly workload meeting to review upcoming work, deadlines, and progress to date. At least once per week, he reviews budget status reports of each task on his projects based on the most current timesheet postings. Any task nearing 80% of budget is flagged for review with the task lead to make sure the remaining work can be completed within the budget.

In this way, issues are identified early and the task can be brought to the earned value to date via various project management tactics such as parallel design for non-critical path elements, work-around, and extending resources from other offices. To provide quality control and consistency, Steven will also oversee monthly progress reporting and invoicing functions.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 10
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

QUALITY ASSURANCE / QUALITY CONTROL

COMMITMENT TO QUALITY CONTROL
DEA’s Quality Management Plan is an essential element in our approach to deliver a project that meets or exceeds City requirements. A Quality Assurance / Quality Control manager is appointed at the beginning of every task order project and has overall responsibility and authority to implement the QA program, including resource and training needs, approving the Quality Management Plan, documentation, and monitoring progress. The terms Quality Assurance and Quality Control are often used interchangeably, but DEA clearly distinguishes these concepts as follows.

QUALITY ASSURANCE
Quality Assurance (QA) is an overall program that establishes project related policies, procedures, standards, guidelines, and systems aimed at producing an acceptable level of quality in our products. These are things we do continuously before, during, and upon completion of specific project deliverables to make sure we understand what is required of our deliverables and that those requirements are met. But most importantly it’s the things we do during the process like setting and communicating standards and verifying City requirements, among others. The goal is to do things right, the first time, by verifying that the project requirements are clearly defined and communicated.

QUALITY CONTROL
Quality Control (QC) is project-specific activities consistently applied to assist with quality project deliverables.

The objective of DEA’s QC program is to detect and eliminate major defects in project work products and limit minor defects consistent with commonly accepted standards. This is accomplished through the application of continuous checks and comprehensive reviews prior to each delivery milestone adopting the 30-60-90 percent review. We believe that this procedure will increase quality control, attention to project controls, and target budgets. The QC program is project specific (technical review, accuracy review, interdisciplinary review, constructability review) and is implemented under the authority of the QA/QC manager.

DEA has developed internal QA/QC
tools that each discipline follows for the
development of all plans, estimates,
reports, or other deliverables defined in the
scope. These include detailed checklists
and narratives that highlight expectations
for all team members to follow. Internal
staff have been trained in and are required
to utilize these tools in the day-to-day
delivery of work products.

Before delivering any submittal, DEA conducts
independent internal reviews of all deliverables.

Should issues of quality arise after submittal,
DEA will work proactively with the City to
promptly resolve them.

Copies of outgoing and incoming
documents are stored in a filing
system that maintains the integrity
and accessibility of both hard copy
and electronic documents. The
City will be provided with electronic
and/or hard copies as required by
specific projects.

Our QMs receive special training in QA/
QC procedures and must pass a test
before becoming a certified QM. The QM
works closely with the PM to see that the
quality assurance and quality control plans
are strictly followed.

At project start-up, the DEA project manager
prepares a quality control plan that identifies the
quality manager (QM) and subsequent primary
reviewers for different project deliverables.

DEA’s Quality
Control
Program
Quality
Control
Quality
nI
et nr
l a
Control
Manager
Too sl
l eD vi r e ab el
s Document
Plan
DEA’s Quality Control Program
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 11
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

PROJECT TEAM SUBCONSULTANTS
Our contract manager, Steven Anderson, PE, has over 17 years of professional civil engineering experience working for various agencies throughout Southern California. Our internal team and subconsultants have extensive experience in the design of projects for agencies like the City of Gardena in the areas of civil design, transportation/ traffic design, landscape architecture, and irrigation design. We have added the following subconsultants to our team.

Geotechnical Engineering
Earth Mechanics, Inc. (EMI) is a geotechnical and earthquake engineering consulting company founded as a California Corporation in February 1989.

The firm specializes in major geotechnical and geologic site investigations and laboratory testing, seismic hazard and earthquake retrofit evaluations, and grading and foundation design for transportation infrastructure projects including freeways, roadways, bridges, tunnels, drainage facilities, and earth retaining structures. With a staff of 39, EMI has offices located throughout California. The headquarters is in Fountain Valley, California in Orange County, which has a Caltrans-certified soils and rock laboratory.

Project Experience:
■ I-605/Katella Avenue Interchange Improvement Project, Orange County, California ■ Golden Avenue Bridge Replacement (HBP), Placentia, California ■ Four Bridge Replacements (HBP), Orange County, California ■ Crown Valley Parkway Widening Project, Laguna Niguel, California ■ Pacific Avenue Pedestrian and Bicycle Improvements Project, Jurupa Valley, California Founded in 1992, AZTEC Engineering Group, Inc. (AZTEC) is an established full-service engineering, environmental and field services consulting firm with more than 200 employees in offices in California, Arizona, Virginia and Indiana. For over 30 years, AZTEC has built and maintained an excellent reputation as a quality consulting firm that is dedicated to meeting clients’ needs through strong project management and experienced, dedicated staff. AZTEC is part of the TYPSA Group, an international multidisciplinary consulting firm with over 3,500 employees in 60 offices worldwide. One of AZTEC’s core business disciplines is providing SUE services for public agencies, municipalities, and private clients through pre-qualified, on-call or direct select contracts. Since 2004, AZTEC has provided SUE services for numerous clients throughout Southern California.

Project Experience:
■ Narbonne Avenue Main Water Replacement Project, Lomita, California (subconsultant to DEA) ■ Caltrans District 7 On-Call Positive Location of Underground Utility Facilities (Potholing), California ■ Van Buren Boulevard Sewer Installation Project, Riverside, California Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 12
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

FAMILIARITY / EXPERIENCE WITH SOUTH BAY CITIES COUNCIL OF

GOVERNMENTS (SBCCOG)
DEA’s staff have worked on projects within the purview of the South Bay Cities Council of Governments (SBCCOG) including contracting with individual cities such as the cities of Lomita, Lawndale, Los Angeles, El Segundo, and Redondo Beach. We attend some of the SBCCOG lunch meetings offered every other month.

FAMILIARITY OF REGIONAL GRANTS / COMPETITIVE FUNDS
DEA has experience with preparing successful funding applications at the local, state, and federal level. Our staff has prepared funding applications such as the E76 paperwork for funding authorization.

FUNDING ASSISTANCE
■ Chandler Extension Bikeway Project, City of Burbank: DEA has provided support in amendment requests to Caltrans District 7 for Metro - Measure R and CMAQ federal funds via E-76. The team is currently working with Burbank, Caltrans and Metro to obtain authorization for PE Phase funds. ■ Rio Hondo Bridge Widening (I-710/Firestone Boulevard Interchange Phase 3), City of South Gate:

Prepared successful application for HBRR funding ($5.412m HBRR funds) including bridge widening, deck replacement, roadway approach improvements, painting, barrier rail improvements, and seismic retrofit.

Also prepared Request for Authorization for obligation of funds through Caltrans for HBRR funds and Letter of Agreement for MTA Proposition C funds.
■ Los Angeles River Bridge Widening (portion of I-710/Firestone Boulevard Interchange Phase 4A), City of South Gate: Prepared successful application for HBRR funding ($4.321 m HBRR) including bridge widening, deck rehabilitation, roadway approach, and barrier rail improvements. Also prepared Request for Authorization and Finance Letter for obligation of funds through Caltrans for HBRR funds and Letter of Agreement for MTA Proposition C funds. Assisted City with paperwork required to convert RSTP fund to Proposition C.
■ Union Street Two-Way Cycle Track, City of Pasadena: Prepared the funding application for the 2019 Metro Call for Projects for the Pilot Program from Caltrans Local Assistance in the Active Transportation Program category.
■ Redondo Beach Boulevard Mobility Enhancement Improvements, City of Lawndale: Prepared a funding application for the 2015 Metro Call for Projects in the Regional Surface Transportation Improvements category for improvements on Redondo Beach Boulevard between Prairie Avenue and Artesia Boulevard.
■ US-101/Victoria Avenue Interchange, City of San Buenaventura. Assisted the City in the preparation of federal funding forms (FNM76) for $3.5 million. The project included the rehabilitation of Victoria Avenue, the reconstruction and reconfiguration of the interchange, and the relocation of Valentine Road. ■ Lincoln Avenue, City of Buena Park, OCTA. Prepared funding applications for OCTA Call for Projects. ■ I-10 / Sierra Avenue Interchange, City of Fontana. Project involved the complete reconstruction of the interchange and conversion from a diamond configuration to an urban (single point diamond) interchange.

Prepared successful funding application for National Highway System Demonstration Projects program.

Project cost was approximately $17 million of which approximately half came from the federal funds.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 13
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

ATP AND HSIP FUNDING APPLICATION EXPERIENCE
DEA’s team has extensive experience in preparation of applications for ATP and HSIP projects. We have completed numerous ATP and HSIP applications. Presented below is the requested funding for the applications, and the approved funding for those applications that were successfully awarded. As presented, we have a 55% success rate for ATP applications, and an 87% success rate for HSIP applications prepared by DEA.
45%
50%
100%
City of Victorville
$5.7 M
Granted
ATP Application Success
City of Palmdale
$8.7 M
Granted
100%
LA Metro
$21.0 M
Granted
55%
77% 100%
City of Ridgecrest
$2.2 M
Granted
HSIP Application Success
City of Barstow
$1.0 M
Granted
100%
City of Hesperia
$200 K
Granted
City of Lancaster
$700 K
Granted
87%
City of Victorville
$400 K
Granted
100%

TOTAL GRANTED
$4.5 M

TOTAL GRANTED
$35 M
Total Requested Total Granted
$68.8 M $39.7 M 58%
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 14
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 3. KEY PERSONNEL AND EXPERIENCE

LIST OF CONTRACTS WITH OTHER LOCAL AGENCIES
The DEA team is organized to provide the contract manager and the City of Gardena (City) with flexibility and resources to meet the needs of the varying levels of work that could potentially be assigned under this oncall contract. Our team includes staff with experience in every project type and task that may be needed to accommodate the City's needs. Our experience performing the type of services requested and our regional resources will facilitate our ability to meet your needs, regardless of the level of work assigned.

Our abilities are best demonstrated by projects we have recently and successfully performed. DEA has performed on a range of projects providing professional engineering services. We have also performed these projects over a range of project development phases including feasibility studies, preliminary engineering, final engineering, and quality reviews / peer review / constructability review.

On these projects our staff has performed the following:
■ Plan preparation for street improvements, repair, rehabilitation, or other related street improvements. ■ Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
■ Preparation of hydrology and hydraulic analysis and reports. ■ Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. ■ Geotechnical engineering and material testing as needed. ■ Preparation of project technical provisions.
■ Preparation of detailed cost estimates.
■ Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. ■ Provide design and construction surveys.
■ Provide construction assistance.
■ Coordination with, and approvals from other permitting agencies and utility companies A summary of key personnel is provided in this section. Our proposed Contract Manager, Steven Anderson has proven himself to be a service-oriented contract manager/project engineer who will see that your project needs are met by bringing together technical experts to deliver precise project design in support of this on-call assignment. He will provide you with up-to-date costs and schedule control, and maintaining communications with the stakeholders including City staff, utility companies, construction personnel, and others as necessary.

The following is a list of a public agency projects for which we have performed similar work within the last five years.

Project Services Agency Design
Cost
Year
Completed
TOS No. 121, Liechty Middle
School
Civil design, ADA
upgrades, utility
coordination
City of Los Angeles $2,626,739 Ongoing
Main St. and Sultana St. /
Timberlane Ave. Traffic Signal
Improvements
Civil design, SWPPP,
WQMP
City of Hesperia $390,000 Ongoing
San Fernando and Chandler
Bikeway
Specifications, Estimates,
Permitting coordination,
civil design
City of Burbank $143,100 2024
Central Road Widening Civil design, hydrology
analysis, specifications,
estimate, geotechnical
engineering
Town of Apple Valley $375,800 Ongoing
OC Bikeway Loop Segment D Civil design, WQMP County of Orange $90,000 2020 Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 15
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Project Services Agency Design
Cost
Year
Completed
Alley No. 28 Permeable
Pavement
Civil design, hydrology
analysis, specifications,
estimate, geotechnical
engineering
City of Glendale $134,800 2023
Highway Safety
Improvements
Civil design, estimate,
specifications, mapping
City of Twentynine Palms $135,000 2023
24 Curb Ramps Civil design, survey,
specifications, estimate
City of Redondo Beach $85,000 Ongoing
Eastside 2 Parking Structure
and East Campus Drive
Widening
Civil design, WQMP
SWPPP
California State University,
Fullerton
$160,000 2020

STAFF QUALIFICATIONS
The DEA team is organized to provide the City of Gardena with flexibility and resources to meet the needs of the varying levels of work that could potentially be assigned under this on-call contract. Our team includes staff with experience in every project type and task that may be needed to accommodate the City's needs. Our experience performing the type of services requested and our regional resources will facilitate our ability to meet your needs, regardless of the level of work assigned. Shown below is the list of staff who will be assigned to this contract for the three services we are proposing.

Name / Firm Title
Years of
Exp.

License /
Certification Education
Steven Anderson /
DEA
Contract Manager 17 CA - PE #73460
CA - PMP #2177347
Envision -
Sustainability
Professional
MBA, 2017, University of California, Los
Angeles
BS, Mechanical Engineering, 2005,
Columbia University
BA, Management Engineering, 2003,
Claremont McKenna College
Sean Haeri/ DEA Principal-inCharge33 CA - PE # 53275
CA - TE #1687
MS, Engineering, 1991, California State
University, Los Angeles
BS, Engineering, 1988, California State
University, Los Angeles
Mark Oskorus / DEA QA/QC 27 CA - PE #62159 BS, Civil Engineering, 1996, California State University, Fullerton
Marie Marston / DEA Civil Engineering
Task Leader
44 CA - PE # 38798
CA - QSD/P #23572
BS, Civil Engineering, 1980, Oregon State
University
MBA, 1988, University of California, Irvine
Armen Ware / DEA Civil Designer 5 VA -EIT #19-709-11 BS, Civil Engineering, 2019, University of Delaware
Kim Schultz / DEA Civil Designer 5 N/A BS, Civil Engineering, 2019, California State Polytechnic University, Pomona
Abigail Hartman /
DEA
Civil Designer 4 CA - EIT #171007 BS, Civil Engineering, 2020, California State University, Fullerton
Lander Pham / DEA Geometric / Civil
Engineer
17 CA - PE #87141 BS, Civil Engineering, 2007, California Polytechnic University, Pomona
BS, Civil Engineering, 1991, HoChiMinh
City University of Technology
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 16
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Name / Firm Title
Years of
Exp.

License /
Certification Education
Greg Kim / DEA ADA Specialist 18 CA - EIT # 132879 BS, Mechanical Engineering, 2006, University of Michigan
Shon Heern / DEA Constructability 27 OR - PE #56450PE BS, Civil Engineering, 1997, Oregon State University
Francois Zugmeyer
/ DEA
Storm Drain /
Hydrology Task
Leader
52 CA - PE #31046 Civil Engineering Degree at L’École
nationale supérieure d’architecture de
Strasbourg (E.N.S.A.I.), 1972
Suzanne Moubayed
/ DEA
Civil Designer 11 CA - EIT #149180 MS, Civil Engineering, 2015, California State University
BS, Civil Engineering, 2013, California
State University
Ryan Williams / DEA Civil Designer 10 CA - EIT #149162 BS, Civil Engineering, 2013, University of Southern California
Kim Rhodes / DEA Landscape
Architect Task
Leader
39 CA - PLA #3867 BS, Landscape Architecture, 1985,
California State Polytechnic University,
Pomona
Heath Habig / DEA Landscape
Architect
28 CA - PLA #5028 BS, Landscape Architecture, 1996,
California State Polytechnic University,
Pomona
Jon-Sen Oen / DEA Senior Irrigation
Designer
26 CA - CID #30459
CA - CLIA #30459
BS, Landscape Irrigation Science, 1998,
California State Polytechnic University,
Pomona
Danny Wang / DEA Irrigation Designer 17 N/A BS, Landscape Architecture, 2006, California State Polytechnic University,
Pomona
Rachel Wells / DEA Landscape
Designer
5 N/A BS, Landscape Architecture, 2019,
California State Polytechnic University,
Pomona
Kent Groh / DEA Survey Task
Leader
31 AZ - PLS #44808
IL - PLS #035-
003445
IA- PLS #17177
MO - PLS #2000-
161235
Associate Of Applied Science (AAS),
Architectural Engineering, 1991, Southern
Illinois University, Carbondale, Illinois
Joseph Wideman /
DEA
Survey Manager 18 CA - PLS #8973 BS, Fire Protection Administration Technology
Jerry Woodrow Surveyor 48 CA - PLS #6714
CA Certified Federal
Surveyor #1138
Surveying and Engineering Classes,
1976, San Bernardino Valley College
Alahesh Thurairajah
/ EMI
Geotechnical
Engineer
15 CA - GE #3123
CA - PE #81439
MS, Civil Engineering, 2011, University of
California, Los Angeles
BS Magna Cum Laude, 2010, Civil
Engineering, California State Polytechnic
University, Pomona
George Enriquez /
Aztec
Potholing 17 OSHA 8-hour
Defensive Driver
On-the-Job Training
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 17
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 4. ORGANIZATIONAL CHART
Our team includes Steven Anderson, PE, PMP, as contract manager and Sean Haeri, PE, TE, CPM as principal in charge. Assisting them will be a team of civil engineers, landscape architects, surveyors, and designers to lead the tasks requested. Additionally, our subconsultants will provide, geotechnical engineering and potholing consulting services as needed.

Contract Manager
Steven Anderson, PE, PMP
Principal In Charge
Sean Haeri, PE, TE, CPM
Quality Assurance / Quality Control
Mark Oskorus, PE
*Key Staff
Staff is DEA unless otherwise noted.

1. Earth Mechanics, Inc.

2. Aztec Engineering Group, Inc.

Kevin Kwak
Assistant Public Works Director
Task Leader
Kim Rhodes, PLA
Landscape Architecture
Heath Habig, PLA
Rachel Wells
Irrigation Design
Jon-Sen Oen, CID, CLIA
Danny Wang
Street Related
Improvements
Task Leader
Marie Marston, PE
Civil Design
Armen Ware, EIT
Kim Schultz
Specifications and
Estimator
Abigail Hartman, EIT
Geometric Design
Lander Pham, PE
ADA Specialist
Greg Kim, EIT
Constructability
Shon Heern, PE
Street Improvements
Survey
Kent Groh, PLS
Joseph Wideman, PLS
Jerry Woodrow, PLS
Geotechnical Engineering
Alahesh Thurairajah, GE ¹
Site Investigation
Task Leader
Francois Zugmeyer, PE
Civil Design
Mark Oskorus, PE
Suzanne Moubayed, EIT
Ryan Williams, EIT
Potholing
George Enriquez ²
Storm Drain / Hydrology
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 18
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 5. SIMILAR PROJECTS
Below you will find a list of our current / recent projects in which similiar professional services to those listed in the RFQ have been provided.

Soto Street Widening, Los Angeles, California
Scope: DEA provided alternative analysis through
final design for the Soto Street Widening from
Multnomah Street to Mission Road. The objective is
to widen Soto Street from two lanes to four lanes to
relieve traffic congestion, especially in the
southbound direction, and improve safety by
implementing the retaining wall to help keep hillside
debris off the roadway. The project will include a
wider sidewalk and bicycle lanes and will greatly
improve vehicular and bicycle mobility in the corridor.

The retaining wall will be built on the east side of Soto Street and is approximately 1,500 feet in length with a varying height ranging from 8 to 34 feet. The retaining wall system proposed in the 65% plans is a soldier pile system consisting of a cast-in-drilled-hole (CIDH) concrete piling below ground and a HP steel pile above ground, precast concrete panels and shotcrete facing. The project also included the implementation of landscape improvements, site furniture, hardscape, and wall aesthetics.

Personnel: Steven Anderson, Mark Oskorus, Kim Rhodes,
Heath Habig, Danny Wang, Kim Schultz
Agency: City of Los Angeles
Contact: Gerry Hernandez
Role: Prime Consultant
Relevance: Street improvement and repair, storm drain
and sewer improvements, hydrology analysis, geotechnical engineering, specifications, estimate, survey, coordination with utility companies on relocation.

TOS No. 121, Liechty Middle School, Los Angeles, California Scope: The City of Los Angeles received a Cycle 4
Active Transportation Program grant for safety
improvements at five schools in Central Los Angeles/
MacArthur Park area of the city. DEA is currently
providing civil and traffic improvements to encourage
walking and biking at five schools including John H.

Liechty Middle School, Esperanza Elementary
School, Tenth Street Elementary School, Gratts
Learning Academy for Young Scholars, and Gratts
Early Education Center. The ATP’s purpose is to
encourage increased use of active transportation,
walking and biking.

Personnel: Steven Anderson, Sean Haeri, Armen Ware,
Greg Kim, Mark Oskorus, Kim Schultz, Joe Wideman
Agency: City of Los Angeles
Contact: George Huang
Role: Prime Consultant
Relevance: Street improvements including ADA
upgrades, storm drain modifications, hydraulic analysis, specifications, estimate, survey, coordination with utility companies on relocation.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 19
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Narbonne Avenue Improvements, Lomita, California
Scope: The City's intent for the Narbonne Avenue
project included construction improvements from
Pacific Coast Highway to the southern city limits for a total of 1,600 feet. DEA provided civil improvements
including replacement of a 1928 6”/8” waterline and
pavement rehabilitation. The street is approximately
60 feet wide curb to curb and is four-lanes with a
center turning lane. The City also implemented traffic
calming measures by narrowing the street to twolanes with a center turning lane. A permit with Caltrans was required for the waterline connection
within PCH. Pavement recommendations included a
combination of mill and overlay as well as complete
reconstruction for some sections.

Personnel: Marie Marston, Francois Zugmeyer, Suzanne
Moubayed
Agency: City of Lomita
Contact: Sam Sampat
Role: Prime Consultant
Relevance: Street improvement, ADA upgrades, WQMP,
geotechnical engineering, specifications, estimate, survey, approval with permitting agency (Caltrans).

On-Call Engineering Design Services, Los Angeles, California Scope: DEA is currently under contract with the City
of Los Angeles Bureau of Engineering to provide
on-call engineering services for bridge, civil, and
landscape architecture. Services DEA has contracted
to provide include civil and bridge structural
engineering, surveying and permitting, landscape
architecture, traffic engineering, value engineering,
special services, and construction management. The
following projects have been issued as task orders
under this contract.

Personnel: Steven Anderson, Sean Haeri, Armen Ware,
Greg Kim, Mark Oskorus, Kim Schultz, Abigail Hartman, Joe Wideman, Kim Rhodes, Heath Habig, Jon Oen, Danny Wang,
Rachel Wells
Agency: City of Los Angeles
Contact: Nur Malhis
Role: Prime Consultant
Relevance: Street improvement and repair, storm drain
and sewer improvements, hydrology analysis, geotechnical engineering, specifications, estimate, survey, approval with permitting agency (Caltrans).
■ LA River Greenway-Tampa Avenue Resurfacing
Design
■ B-Permit Plan Checks
■ Overhead Sign Structure Design
■ Design Services for Jordan Downs Development
■ LA River Greenway and Winnetka Ave.

Resurfacing
■ SEP 14 Application
■ First Street Bridge over Glendale Blvd.
■ Century Blvd. Extension Project
■ Soto Street Widening Project
■ 2nd St Tunnel Engineering Evaluation
■ Jefferson Boulevard Complete Streets Project
■ Various Street Projects
■ TOS 53 - Various Street Projects
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 20
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Fairview Street Widening Design and Bridge Replacement, Santa Ana, California Scope: The City planned to widen the street from 9th
Street to 16th Street from a four-lane to a six-lane
arterial which required preparation of street widening
and bridge replacement design, environmental
document, and regulatory permits for Fairview Street
Bridge crossing Santa Ana River. The widening would
provide adequate vehicular capacity within the City’s
northern limits. The project also included pavement
overlay, waterline relocation, bike detours, and traffic control design. A detention basin was included for a
treatment BMP and right-of-way was required for the
federally funded project. The relocation design of an existing 12” waterline was needed to accommodate the temporary and the final locations. Fairview Bridge is striped with two lanes in each direction with no curb or sidewalk. Bridge replacement is necessary to accommodate three lanes in each direction and to provide a complete bridge deck with barrier rail, sidewalk, raised median, and lighting for a total bridge width of 100’ wide. DEA's responsibilities included water quality requirements including the preparation of a water quality management plan, hydrology/hydraulic analyses, river modeling, roadway widening design, ADA compliance, utility design and coordination, traffic signing and striping, specifications, and cost estimate.

Personnel: Marie Marston, Francois Zugmeyer, Suzanne
Moubayed
Agency: City of Santa Ana
Contact: Mindy Ly
Role: Prime Consultant
Relevance: Plan preparation for street improvements,
repair, rehabilitation; Preparation of project technical provisions; Preparation of detailed cost estimates; Provide design surveys; Provide construction assistance
Bastanchury Road and Rose Drive Storm Drain Improvements, Yorba Linda, California Scope: DEA provided civil design services for a new
storm drain system in Rose Drive. During storm
events, the northeast corner of the Rose Drive and
Bastanchury Road intersection experiences localized
flooding. A concept proposed by the City to mitigate
these concerns was to provide a storm drain from the
Bastanchury Road/Rose Drive intersection along
Rose Drive to be connected to the existing 39-inch El
Cajon Avenue storm drain. DEA prepared a
preliminary drainage report and conducted a
hydrology study for all concepts and prepared PS&E
documents. DEA staff coordinated with numerous
utility companies for potholing and determination of conflicts and proposed resolution. The project also included new curb ramps at the intersection.

Personnel: Marie Marston, Francois Zugmeyer
Agency: City of Yorba Linda
Contact: Rick Yee
Role: Prime Consultant
Relevance: Plan preparation for storm drain upgrades;
preparation of hydrology and hydraulic analysis and
reports; Preparation of project technical provisions;
Preparation of detailed cost estimates; Provide design
surveys; Coordination with and approvals from other
permitting agencies and utility companies
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 21
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
On-Call Engineering Services, Laguna Niguel, California Scope: DEA is currently under an on-call contract
with the City of Laguna Niguel to provide civil
engineering services on an as-needed basis. DEA
has been awarded several projects on a task order
basis including the following:
■ Sun County Senior and Community Center
Project: The City desires to maximize parking at
the Sun Country Senior and Community Center on
Aliso Creek Road at Moulton Parkway. DEA’s scope
involved preliminary layout design of six alternatives
along with preliminary quantities and order of
magnitude cost estimates for each one. Alternatives presented ranged from keeping the original parking lot boundary with minor changes to a complete reconstruction with maximum utilization of the existing lot.

The alternatives were presented to the City and the project is awaiting funding to move forward with final design.
■ Pickleball Courts Drainage Mitigation: this project included addressing drainage issues associated with the pickleball courts and surrounding park area at the southeast corner of Crown Valley Parkway and Adelanto Drive. DEA provided an exploratory phase including aerial and field survey, a preliminary drainage study, site investigation, and exploratory drilling of the courts. This information was assessed noting the deficiencies of the existing drainage systems, hillside seepage under the courts and retaining wall seepage in the retaining wall on the side of the courts. The resulting assessment with concept alternatives split the issues into two distinct projects. The City chose to continue with the Pickleball Courts Drainage Mitigation. The construction document phase, including plans, specifications and estimate for bid were prepared addressing three primary concerns including design of a small drainage system to contain the weep hole drainage along the south side of the courts; the addition of a v-ditch running the length of the west side of the courts; and the repair of the crumbling wall section spall at the midpoint of the north end of the courts.
■ Alicia Parkway and Marina Hills Drive Rehabilitation Project: DEA provided engineering services to rehabilitate Alicia Parkway (7,100’) from Highland Avenue to Crown Valley Parkway, and Marina Hills Drive (6,550’) from Niguel Road to Golden Lantern. 15 and 7 non-ADA compliant curb ramps along Alicia Parkway and Marina Hills Drive respectively were updated to ADA standards. The project also included traffic signal modification plans for adding traffic signal video/radar detection system and new traffic controllers to four intersections. Other project services included, field review, surveying, geotechnical investigations, traffic index calculations, pavement analysis, geotechnical report, utility adjustments, striping design (adding buffered bike lane), final PS&E, bidding document preparation, and construction support. The project included federal funding. Additionally we assisted the City on preparation of the federal funding paperwork to process through Caltrans District 12.

Personnel: Marie Marston, Francois Zugmeyer, Suzanne
Moubayed
Agency: City of Laguna Niguel
Contact: Jacki Scott, PE
Role: Prime Consultant
Relevance: On-call civil engineering, geotechnical
engineering, ADA curb ramps, traffic, PS&E.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 22
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Aliso Viejo Ranch, Aliso Viejo, California
Scope: The City of Aliso Viejo proposed the
development of a 7.7-acre city-owned historic ranch
site. The proposed improvements consisted of
creating a community park preserving the historic
nature of the property and providing an educational
resource regarding the history and farming. The
improvements included an active sustainable farming
element based on fish ponds and natural fertilization
through the use of water from the ponds. Other
amenities included meeting room buildings, a storage
building, an amphitheater, a surface parking lot, and
associated landscape and hardscape.

DEA's scope of work included the preliminary and final engineering including a site survey, topographic aerial base mapping, grading, wet utility connections, site demolition, drainage study and plans, and the Water Quality Management Plan (WQMP). The site has poor infiltration capabilities, as such, the site will utilize a combination of infiltration basins, pervious concrete with underdrains in the parking lot, planter areas with underdrains, and vegetated swales. The design of the water quality system needed to meet the stringent requirements of the San Diego Water Quality Control Board. The requirements include mitigation of post projects flows to not exceed the pre-project flows of a 2-year, 5-year, 10-year and 25-yr storm event and preproject conditions being the original hills, before the Aliso Viejo area original mass grading.

Personnel: Marie Marston, Francois Zugmeyer
Agency: City of Aliso Viejo
Contact: Jim Wilson
Role: Prime Consultant
Relevance: Plan preparation for storm drain and sewer
improvements; preparation of hydrology and hydraulic
analysis and reports; Preparation of WQMPs, SWPPPs;
Preparation of project technical provisions; Coordination with and approvals from other permitting agencies and utility companies
24 Curb Ramp Design Project, Redondo Beach, California
Scope: As part of the City of Redondo Beach’s
expenditure of Community Development Block Grant
Funds, the City continues to make qualifying public
improvements, including rebuilding curb ramps to
meet current standards. DEA is supporting the City’s
efforts through the development of conceptual layouts
and a report of recommended improvements,
PROWAG standards and examples of solutions for
rebuilds of ramps within tight right-of-way conditions, civil improvement construction plans and a cost
estimate for 24 curb ramps at 12 intersections. DEA
tasks include topographic survey, preparing base
maps, plotting existing utility details, civil improvements to sidewalk, curb, and gutter at multiple intersections.

Personnel: Steven Anderson, Armen Ware, Abigail Hartman, Kent Groh, Joseph Wideman
Agency: City of Redondo Beach
Contact: Andrew Winje
Role: Prime Consultant
Relevance: ADA curb ramp design
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 23
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Mitchell Avenue Storm Drain Improvements, Tustin, California Scope: During the City of Tustin’s routine inspection
of the existing storm drain system, they found the
existing CMP drain had extensive corrosion and
portions of the pipe had rusted away. With an
imminent potential for the pipe to collapse, block
drainage and impact the street and parkway above,
the City hired DEA to determine the best course of
action and then prepare storm drain improvement
plans for that option. The project consisted of
rehabilitating the existing CMP arch that has been
severely deteriated. The project scope included
preparation of a drainage report detailing existing
drainage patterns and system capabilities, including hydrology calculations per the Orange County Hydrology Manual to assess the operation of the existing CMP Arch storm drain and the evaluation of proposed improvements, preliminary drainage alternatives and cost estimates. Determined facilities required to meet current drainage system requirements including inlet locations and pipe sizes.

DEA analyzed several alternatives to rehabilitate or replace the storm drain. Preliminary alternatives included in-place rehabilitation, removal and replacement of the facility, construction of new facilities at new location/ alignment. Cost estimates were prepared for each alternative. Due to the excessive number of underground utilities and location within the parkway, the storm drain rehabilitation alternative selected involved ultra violet cured-in-place pipe liner. The liner repaired the corroded sections of pipe and provided a new drainage conduit within the existing CMP. Additional catch basins, RCP, and street improvements were also included in the design to mitigate storm runoff volumes flowing along Mitchell Avenue. The final plans consisted of lining the existing CMP with UV cured PVC and installation of additional catch basins and inlets. DEA prepared a drainage report including an area wide hydrology study. Alternatives were designed to capture a 10-year storm event. Due to the extensive underground utilities and existing power poles, pipe replacement was cost prohibitive and problematic. The preferred alternative involved pipe rehabilitation using a UV cured PVC liner. DEA prepared final construction documents for the pipe rehabilitation including upgrading existing catch basins and laterals, installation of new catch basins and laterals and stubouts for future storm drain extensions.

Personnel: Marie Marston, Francois Zugmeyer, Suzanne
Moubayed
Agency: City of Tustin
Contact: Eric Johnson
Role: Prime Consultant
Relevance: Plan preparation for storm drain improvements; preparation of hydrology and hydraulic analysis and reports; Preparation of WQMPs, SWPPPs; Preparation of project
technical provisions; Coordination with and approvals from other permitting agencies and utility companies
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 24
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Great Streets Pavement Rehabilitation Project, San Gabriel, California Scope: The City of San Gabriel has an annual Great
Street Program intended to reconstruct and maintain
the City’s pavement as identified through field
investigation and their Pavement Management
Program. In this project, the City identified two
phases with nine streets in each phase requiring
complete reconstruction. DEA provided design
services for the pavement rehabilitation and
reconstruction of these 18 streets (3.6 miles) within
the City. The 18 streets are located primarily in
residential and commercial areas of the City. Since
most of the 18 streets had not been rehabilitated for
more than 20 years, the roadway asphalt exhibited signs of various asphalt distress including block, transverse, longitudinal, map, and alligator cracking. The project included field review, surveying, geotechnical investigations, pavement analysis, geotechnical report, pre-design report, ADA ramp reconstruction, sidewalk reconstruction, striping, final design including plans, specifications, and estimates, bidding document preparation, and bidding and construction support. The analysis included review of full depth reconstruction with cement stabilized or recycled asphalt concrete layers with an option for cold central plant recycling (CCPR). The City selected AC over cement stabilized pulverized base (CSPB).

Personnel: Marie Marston, Francois Zugmeyer
Agency: City of San Gabriel
Contact: Angela Cheng
Role: Prime Consultant
Relevance: Plan preparation for street improvements,
repair, rehabilitation; Preparation of project technical provisions; Preparation of detailed cost estimates; Provide design surveys; Provide construction assistance
On-Call Civil Engineering and Surveying Services, Temecula, California Scope: The scope of services for DEA’s annual
agreement with the City of Temecula includes
providing engineering design and surveying services
for various projects. Specific tasks include
researching existing record data, performing
preliminary and final engineering, and preparing
PS&E documents for the City’s use in bidding
projects. Survey tasks include researching existing
survey data including maps, records of survey,
monument ties, and benchmarks; locating existing
monuments; performing boundary and control
surveys; preparation of legal descriptions and plats
for right-of-way acquisition; aerial mapping and topography; establishing and verifying horizontal and vertical control; field surveys; and construction staking. DEA provided design survey services for the Overland Drive Extension project, and provided a complete PS&E package for the Nicolas Road Pavement Rehabilitation.

Personnel: Steven Anderson, Mark Oskorus, Armen Ware,
Abigail Hartman, Kim Rhodes, Heath Habig, Jon Oen, Danny Wang, Rachel Wells, Jerry Woodrow, Kent Groh
Agency: City of Temecula
Contact: Ron Moreno
Role: Prime Consultant
Relevance: On-call civil engineering, surveying, landscape architecture; PS&E.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 25
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 6. REFERENCES
Provided below are references from public agency clients for whom similar services have been provided within the past five years.

CITY OF LAGUNA NIGUEL
Jacki Scott, PE
Public Works Director
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
(949) 362-4337
[email protected]

CITY OF LOS ANGELES
Scott Gibson, PE
Bridge Improvement Division,
Acting Division Manager
1149 S. Broadway Suite 750
Los Angeles, CA 90015
(213) 485-5101
[email protected]

CITY OF YORBA LINDA
Rick Yee, PE
Deputy Director Public Works/
Assistant City Engineer
4845 Casa Loma Avenue
Yorba Linda, CA 92886
(714) 961-7171
[email protected]

CITY OF NEWPORT
BEACH
Dave Webb
Public Works Director
100 Civic Center Drive
Newport Beach, CA 92660
(949) 644-3309
[email protected].
ca.us

CITY OF GLENDALE
Armen Avazian, PE, ENV SP
Principal Civil Engineer
633 E. Broadway Room 204
Glendale, CA 91206
(818) 937-8246
[email protected]

CITY OF BURBANK
David Null, PE, MASCE
Senior Civil Engineer
275 E. Olive Avenue
Burbank, CA 91502
(818) 238-3946
[email protected]
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 26
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 7. FEE SCHEDULE

EMPLOYEE POSITION / TITLE HOURLY RATE
Principal in Charge $390.00
Contract Manager $371.00
QA/QC Manager $235.00
Project Manager V $335.00
Project Manager IV $320.00
Project Manager III $300.00
Project Manager II $285.00
Project Manager I $270.00
Civil Engineer V $280.00
Civil Engineer IV $225.00
Civil Engineer III $200.00
Civil Engineer II $185.00
Civil Engineer I $170.00
Civil Design IV $165.00
Civil Design III $155.00
Civil Design II $145.00
Civil Design I $135.00
Landscape Architect Manager $295.00
Landscape Architect V $237.00
Landscape Architect IV $220.00
Landscape Architect III $196.00
Landscape Architect II $176.00
Landscape Architect I $155.00
Landscape Designer V $186.00
Landscape Designer IV $163.00
Landscape Designer III $135.00
Landscape Designer II $108.00
Landscape Designer I $90.00
Irrigation Designer IV $170.00
Irrigation Designer III $140.00
Irrigation Designer II $112.00
Irrigation Designer I $85.00
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 27
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

EMPLOYEE POSITION / TITLE HOURLY RATE
Survey Lead $270.00
Survey Manager III $237.00
Survey Manager II $220.00
Survey Manager I $196.00
Party Chief $200.00
Survey Analyst III $170.00
Survey Analyst II $160.00
Survey Analyst I $150.00
Administrative Support III $140.00
Administrative Support II $125.00

DIRECT COST UNIT AMOUNT
Parking each Per receipt
Mileage mile Per IRS rate
Courier/Mail each Per receipt
Copying B&W each $0.12
Copying Color each $0.90
Printing Services each Per receipt

1. The base rates stated are for June 13, 2024 and will remain fixed through the initial term of the agreement, anticipated for September 2024 to September 2027.

2. If additional years are added to the contract, escalation will be provided for years 4 and 5 of the contract.

3. The annual escalation will not exceed the rate of increase for the cost of goods as provided by the CPI-U:

Los Angeles-Riverside-Orange County at www.bls.gov

4. Prevailing wages are subject to the California Department of Industrial Relations at www.dir.ca.gov

5. There will be no markup for direct costs, markups for subconsultant fees will not exceed 5%.

6. All travel expenses (per diem, hotel, airfare) shall be pre-approved by the City prior to execution. All travel expenses shall follow current Caltrans travel and expenses guides.

NOTES:

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 28
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
17800 Newhope Street, Suite B, Fountain Valley, California 92708  Tel: (714) 751-3826 EARTH MECHANICS, INC. FEE SCHEDULE
2024 – 2028
City of Gardena
On-Call Engineering Services
*Non-exempt staff subject to overtime pay per California law.

Reimbursable expenses including, but not limited to, drilling, traffic control, waste disposal, specialty testing, and private utility location services will be reimbursed at actual cost with supporting invoice.

Charges invoiced for travel, lodging, and subsistence shall not exceed the Caltrans rates.

Combined Overhead Rate = 170.68%
Profit = 10 %
Classification
Fully Burdened
Hourly Rate
2024
Fully Burdened
Hourly Rate
2025
Fully Burdened
Hourly Rate
2026
Fully Burdened
Hourly Rate
2027
Fully Burdened
Hourly Rate
2028
Principal/Senior Consultant $ 303.00 $ 318.00 $ 334.00 $ 351.00 $ 369.00 Principal Engineer/Geologist $ 302.00 $ 317.00 $ 333.00 $ 350.00 $ 368.00 Senior Engineer/Geologist $ 224.00 $ 235.00 $ 247.00 $ 259.00 $ 272.00 Senior Project Geologist $ 204.00 $ 214.00 $ 225.00 $ 236.00 $ 248.00 Project Engineer/Geologist $ 174.00 $ 183.00 $ 192.00 $ 202.00 $ 212.00 Senior Staff Engineer/Geologist $ 153.00 $ 161.00 $ 169.00 $ 177.00 $ 186.00 Staff Engineer/Geologist $ 134.00 $ 141.00 $ 148.00 $ 155.00 $ 163.00 Senior Technician $ 156.00 $ 164.00 $ 172.00 $ 181.00 $ 190.00 Technician* $ 81.00 $ 85.00 $ 89.00 $ 93.00 $ 98.00
Project Analyst $ 147.00 $ 154.00 $ 162.00 $ 170.00 $ 179.00 17800 Newhope Street, Suite B, Fountain Valley, California 92708  Tel: (714) 751-3826 EARTH MECHANICS, INC. FEE SCHEDULE
2024 – 2028
City of Gardena
On-Call Engineering Services
*Non-exempt staff subject to overtime pay per California law.

Reimbursable expenses including, but not limited to, drilling, traffic control, waste disposal, specialty testing, and private utility location services will be reimbursed at actual cost with supporting invoice.

Charges invoiced for travel, lodging, and subsistence shall not exceed the Caltrans rates.

Combined Overhead Rate = 170.68%
Profit = 10 %
Classification
Fully Burdened
Hourly Rate
2024
Fully Burdened
Hourly Rate
2025
Fully Burdened
Hourly Rate
2026
Fully Burdened
Hourly Rate
2027
Fully Burdened
Hourly Rate
2028
Principal/Senior Consultant $ 303.00 $ 318.00 $ 334.00 $ 351.00 $ 369.00 Principal Engineer/Geologist $ 302.00 $ 317.00 $ 333.00 $ 350.00 $ 368.00 Senior Engineer/Geologist $ 224.00 $ 235.00 $ 247.00 $ 259.00 $ 272.00 Senior Project Geologist $ 204.00 $ 214.00 $ 225.00 $ 236.00 $ 248.00 Project Engineer/Geologist $ 174.00 $ 183.00 $ 192.00 $ 202.00 $ 212.00 Senior Staff Engineer/Geologist $ 153.00 $ 161.00 $ 169.00 $ 177.00 $ 186.00 Staff Engineer/Geologist $ 134.00 $ 141.00 $ 148.00 $ 155.00 $ 163.00 Senior Technician $ 156.00 $ 164.00 $ 172.00 $ 181.00 $ 190.00 Technician* $ 81.00 $ 85.00 $ 89.00 $ 93.00 $ 98.00
Project Analyst $ 147.00 $ 154.00 $ 162.00 $ 170.00 $ 179.00 Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 29
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

SCHEDULE OF FEES

CITY OF GARDENIA
3-YEAR RATE (THROUGH 2027)
Prime Firm: David Evans & Associates, Inc.

Subconsultant Firm: AZTEC Engineering Group, Inc.

Classification Hourly Rate
Mobilization / Demobilization $750.00
SUE CAD Drafter $175.00
SUE Project Manager $295.00
SUE Operating Engineer $295.00 – Prevailing Wage
SUE Laborer $205.00 – Prevailing Wage
SUE Designating Crew (2-person) $455.00 – Prevailing Wage SUE Designating Crew (1-person) $305.00 – Prevailing Wage Survey Party Chief $280.00 – Prevailing Wage
Survey Instrument Man $205.00 – Prevailing Wage
Professional Land Surveyor $325.00
Potholes in Unpaved Surface
(depth 6 feet or less)
$1,750.00/hole – Prevailing Wage
Potholes in AC Surface
(depth 6 feet or less)
$2,000.00/hole – Prevailing Wage
Potholes in Concrete Surface
(depth 6 feet or less)
$2,300.00/hole – Prevailing Wage
Pothole Additional Depth
(over 6 feet, any surface)
$125.00/foot or fraction thereof –
Prevailing Wage
Pothole/Slot Trench – Hourly Excavation $475/hour – Prevailing Wage Coring (8” diameter hole) $150/hole – Prevailing Wage
City Authorized Expenses Direct Cost
Disposal of Pothole Waste Cost Per Load
Traffic Control Vendor Cost Per Day
Traffic Control Plans (MUTCD or Stamped) At Cost
Off-Duty Police Officer Cost Per Hour
Slurry Backfill Cost Per Load
Surface Restoration Cost Per Load / Cost of Material
Permits Direct Cost
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 30
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
SECTION 8. RESUMES
Steven has 17 years of civil design experience, the majority developing civil improvements for public works programs. He understands the full spectrum of support through all phases of work from conceptual designs to alternative analysis, environmental documentation support, preliminary studies, final design, bid support and construction services support. Steven also has performed public outreach events, met with agency board members to discuss project impacts, drafted technical documents for public use and organized design teams for operational efficiency. In addition, his project management experience leading multidiscipline consultant teams has demonstrated the needed ability to execute on schedule and within budget to the defined scope.

He can also provide program management support with board reports, cost estimating, scheduling and document control services. Steven has recent experience working on various transportation projects.

Project Experience:

Soto Street Widening, Los Angeles, California
Steven served as lead engineer for the Soto Street Widening from Multnomah Street to Mission Road project. The objective is to widen Soto Street from two lanes to four lanes to relieve traffic congestion, improve safety by implementing a retaining wall to help keep hillside debris off the roadway, and to beautify the corridor. The project will include new sidewalk and street trees on both sides of Soto Street, and a Class 4 protected bikeway which will greatly improve vehicular and bicycle mobility and safety. The project requires coordination with the Los Angeles Department of Transportation (LADOT), Los Angeles Department of Water and Power (LADWP), Council District 14 for community outreach, and with the recently completed Soto Mission Bridge removal project and pending Soto Valley bridge widening and street improvement project. The retaining wall to be built on the east side of Soto Street is approximately 2,150 feet in length with a varying height ranging from 8 to 40 feet. The retaining wall system proposed will consist of cantilevered soldier pile design and tie back support anchors. The project also includes the implementation of landscape improvements, site furniture, hardscape and wall aesthetics.

Main Street and Sultana Street / Timberlane Avenue Traffic Signal Improvements, Hesperia, California
Steven is serving as the project manager for the development of a four-way traffic signal at the intersection of Sultana Street /Timberlane Avenue and Main Street in the City of Hesperia. Due to multiple accidents in the area and high speeds on Main Street, the City requested a traffic signal be installed.

In addition to the four-way signals, the project includes hydrology design for existing drainage easements, ADA curb ramps, partial street replacement, and utility relocation with Southern California Edison. The project requires preliminary engineering, geotechnical reports, CEQA/NEPA approval, multiple environmental studies, survey, and final design. Once the project is ready for bid, DEA will provide SWPPP review, in addition to construction and bid support.

Steven Anderson, PE, PMP | Contract Manager
Education
MBA, 2017, University of
California, Los Angeles
BS, Mechanical
Engineering, 2005,
Columbia University
Registration
Professional Civil Engineer,
California (73460), 2008
Project Management
Professional #2177347,
2018
Envision Sustainability
Professional (ENV SP),
2017
Years of Experience: 17
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 31
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Jefferson Boulevard Complete Streets, Los Angeles, California Steven provided design and management support for this project in the City of Los Angeles. DEA provided civil engineering services to the City of Los Angeles on the Jefferson Boulevard Complete Streets project.

The project design included an evaluation of the existing roadway improvements to determine the necessary replacement and modifications to provide improved access and mobility to the project. The street evaluation also included preparation of technical reports, exhibits and budgetary costs to implement the City’s Complete Street programs for Jefferson Boulevard. The final design included civil engineering plan and profile drawings, landscape architecture plans, traffic signal and striping plans, construction specifications, bid documents, and engineers cost and quantity estimates. The final PS&E bid package was designed in accordance with the City standard design documents and manuals.

TOS No. 32 - 2nd Street Tunnel Engineering Evaluation, Los Angeles, California Steven served as the project manager for the restoration of the 2nd Street Tunnel in downtown Los Angeles.

Due to drainage issues and aging of this nearly 100 year old tunnel, the City investigated the current damage of the tunnel and repair options to mitigate any future drainage from damaging the falling tile. Additional elements include an analysis of the historic tile and potential environmental impacts to tile preservation, traffic control and non-standard design documents for delineating repair of the tunnel.

TOS No. 53 - Various Street Projects, Los Angeles, California As project manager, Steven is coordinating the rehabilitation of seven separate projects throughout the City.

Typical project elements include curb and gutter restoration, ADA curb ramps, street partial repair and full repair, utility coordination, structural wall designs, street widening, public outreach, architectural street design elements, traffic control, and drainage improvements. The separate projects also require coordination with the council districts and the expediting of one project per the request of the council. One of the challenges is coordinating the multiple moving parts to several deliverables for each project, verifying quality metrics are met and comments are addressed for each separate report and final design.

San Fernando and Chandler Bikeway, Burbank, California
Steven is serving as the project manager as the DEA team works with the City of Burbank as an owner’s representative, providing support to the City’s project manager for the San Fernando Bikeway by reviewing plan sets, coordinating stakeholder reviews and permitting with outside agencies (LA Metro, Army Corps of Engineers, LA County Flood, obtaining private utility contracts, and validating the environmental and grant compliance with the final design. For Chandler, DEA has provided a rough estimate of cost for the design and construction, reviewed the City’s RFP, provided recommendations on a procurement schedule, provided alternative analysis and obtained funding extensions from Caltrans.

El Segundo Blvd. Program Management Support, El Segundo, California DEA provided project management services for the widening of El Segundo Boulevard, a major arterial sixlane divided arterial from Isis Avenue to Pacific Coast Highway and a four-lane divided arterial from Pacific Coast Highway to Illinois Street. Steven supported city staff, tracked the requirements and deadlines of the grant funding, and provided recommendations on approach with Caltrans on design standards and reporting documentation.

Central Road Widening, Apple Valley, California
Steven is serving as project engineer for the widening and reconstruction of Central Road from Bear Valley Road to Highway 18 in the Town of Apple Valley (Town). The Town identified the need to widen the existing two-lane roadway to three lanes with bike lanes along this two-mile segment. DEA’s tasks include roadway widening, striping of Class II bike lanes, bus turnouts and stop pads, traffic safety improvements at key intersections, constructing driveway approaches to the existing residential development fronting the roadway, drainage improvements, and utility coordination.

Steven Anderson, PE, PMP (continued)
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 32
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Sean Haeri, PE, TE, CPM | Principal-in-Charge
Sean is an experienced principal, self-motivated, high performer, and actionoriented with strong administrative and technical abilities. His responsibilities require effective communication and collaboration with executive and governmental audiences, other departments and outside organizations as well as providing coaching, strategic-thinking, technical and administrative staff support. Sean is a proven leader with over 30 years of professional experience in city government; as well as, 22 years of academic background as a college professor in project management, program development and management information systems.

Project Experience:

Leichty Middle and Neighborhood Elementary Schools Safety Improvement Project and Active Transportation Project, Los Angeles, California
Sean is serving as project manager for this active transportation projects to help students gain access from their homes to the middle school and elementary schools in their neighborhood. This project has the same elements as the Western Our Way project.

Sepulveda Boulevard Widening and Renovation Project between Centinela and Lincoln Boulevard, Los Angeles, California The scope of this project included widening of Sepulveda Blvd. to include three full time lanes and an additional 10 foot space for full-time on-street parking.

Also, based on extensive public outreach efforts, elements of streetscape and sidewalk improvements were added to the scope, to meet the community’s requirement of creating an esthetically pleasing and pedestrian friendly corridor through this Westchester commercial district. Sean’s role as the Project Manager was to oversee and participate in all public outreach meetings, work with the community members to develop an acceptable design concept, and oversee the design and implementation of the project. Sean’s ability to work collaboratively with the community contributed to the success of this project and the buy off of the Westchester stakeholders.

Lincoln Boulevard Light Rail/Bridge Project, Los Angeles, California This project is to remove the existing bridge on Lincoln Blvd. over Ballona Creek and replace it with a new and modern bridge, twice as wide. Currently, this bridge is a bottleneck along Lincoln Blvd. where northbound lanes have to merge before the bridge, there are no Pedestrian Sidewalks or bike lanes across the bridge. This project will create continuity in both the pedestrian and bikeway facilities in addition to additional travel lanes to remove the existing bottleneck. The project also provides enough width for the future center-running Light Rail which is part of the Westside Mobility Study’s proposed complete streets program. My role in this project was to initiate the concept, design the layout, secure funding and oversee the environmental impact studies for both CEQA and NEPA clearances.

Education: MS,
Computer Engineering,
1992, California
State University; BS,
Engineering, 1988,
California State University
Registration: CA - PE #
53275, 1995
CA - TE #1687, 1993
Years of Experience: 33
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 33
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Mark Oskorus, PE | QA/QC
Mark has 27 years of experience in the civil engineering profession with handson design engineering experience on public works, education, commercial, and residential development projects. Mark has an extensive background in all aspects of computer technology as it relates to the civil engineering profession including grading, street, storm drain, sanitary sewer systems, and water LID design; in addition to coordination with utility companies for relocation and installation of new wet and dry utilities. In addition, he has experience providing quality assurance / quality control on numerous projects leading to successful schedule and within budget execution.

Project Experience:

Pauba Road Public Library Parking Project,
Temecula, California
As an independent task under DEA's Pauba Road
Library Parking contract, Mark was project engineer
and provided a comprehensive conceptual level
design and cost estimate for the City's use in
evaluating options for expanding the existing Pauba
Road Library parking area. The conceptual design
presented to the City provided for a secondary
parking area that would accommodate 44 additional
parking stalls. Due to extreme slopes that surround
the existing Library and parking area, location and
layout of the proposed parking area had to be
optimized in order to minimize the amount of costly
earthwork and retaining walls needed for the project.

On-Call Engineering Services, Tustin, California
Mark served as DEA’s primary client contact for
the plan checking contract and he served on the
engineering design staff for the City’s projects.

Services provided included project reviews,
development of the conditions of approval, and plan
checking services including coordination with the
City’s various engineering departments on an on-call
basis. Typical project assignments included residential and commercial public improvements, public park
improvements and bike/horse trail expansions. Plan
checking services included street improvements,
sewer and water improvements, hydrology and
hydraulics, storm drains improvements, grading
and earthwork, water quality basins, and WQMPs.

DEA was also responsible for ensuring proposed
public and private property development designs
met Federal, State, and Local Agency requirements
including ADA, NPDES, and City policies.

Skyline Drive Storm Drain Improvements, Orange,
California
As project engineer, Mark provided engineering
support for the design services for the County of
Orange Flood Control Division/RDMD. The firm’s
first project assignment was the Skyline Storm Drain
Phase 1. The project includes hydrology for Phases
1 and 2. The study resulted in the addition of Phases
3 and 4. The hydrology analysis for this complex
hillside low density area was approved as submitted.

The main line outlet into the Red Hill Channel (F-13)
is a 78” RCP. Phase 1 and 2 were complete in 2004.

DEA was engaged to continue design services on
Phase 4 of the project. Mark, as project manager, led
DEA’s design team for this project that consisted of
approximately 1,500 feet of storm drain design with
utility lateral relocation and approximately 2,600 feet of street resurfacing.

Morningstar Senior Living and Care, Mission
Viejo, California
Mark provided quality control for the conceptual
design, bid documentation, and construction
administration services of a three-story, 132-unit
senior care facility in the city of Mission Viejo. The
building houses independent, assisted, and memory
care patients in a resort-like setting with a wide variety of amenities. The team worked closely with the design
architect on creating two large outdoor courtyard
spaces with built-in barbecues and shaded seating
areas. Other amenities include a dog run, putting
greens, and a swimming pool. Vegetable gardens
were also incorporated to the exterior landscape
plantings.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 34
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Marie Marston, PE, QSD/P | Civil Engineering Task Leader Marie has over 40 years of professional civil engineering experience. Her background includes general infrastructure and public works improvement projects including streets, site improvements for commercial and public facilities, hydrology and storm drains, right-of-way engineering, utility modifications, grading, retaining walls, as well as providing funding applications assistance. Her experience covers projects from inception to completion including project and program management, planning, design, and construction.

Project Experience:

I-15 / Cajalco Road Interchange Reconstruction,
Corona, California
Marie served as project manager for the drainage
and Storm Water Data Report (SWDR). The City of
Corona proposed the reconstruction of the existing
modified diamond interchange to a partial cloverleaf
interchange. DEA was responsible for the final
engineering (PS&E) for all drainage and stormwater
improvements for the interchange project. The project
included construction of a new overcrossing bridge
for Cajalco Road, reconfiguration of all four existing
ramps, and the addition of a new northbound loop
on-ramp. The reconfiguration of the northbound
off-ramp required construction of a bridge over
Bedford Wash. The tasks included preparation of a
SWDR, the Bedford Wash Bridge Hydraulics Report,
hydrology and hydraulic studies, the drainage report,
drainage plans, estimates and specifications. Marie
also assisted with engineering services during
construction.

Street Reconstruction Project, Zone G, Lomita,
California
As project manager, Mare provided design services
for this street reconstruction consisting of 20 street
segments for a total of 2.35 miles. The project
proposes removal and replacement of existing asphalt
concrete pavement, removal of unsuitable base
material, new base preparation, milling for specified
areas, and asphalt concrete overlay. It also includes
construction of 36 curb ramps to meet ADA standards.

The project was divided into two bid sets with four
phases to accommodate a separate waterline project
the City is planning. The 26 plan sheets consisted of
title, typical sections, layouts, curb ramp details, and signing and striping plans. Some streets are planned
for cold milling and overlay while others are planned
for complete structural section replacement.

Alicia Parkway and Marina Hills Drive Pavement
Rehabilitation Project, Laguna Niguel, California
As project manager Marie prepared final design
PS&E for street rehabilitation on Alicia Parkway
from Highland Avenue to Crown Valley Parkway and
on Marina Hills Drive from Niguel Road to Golden
Lantern. The two projects were prepared with three
separate bid packages – two for Alicia Parkway and
one for Marina Hill Drive. Alicia Parkway is a six-lane roadway with sidewalks and landscaping. A total of
16 sheets were prepared for the two Alicia Parkway
bid sets including title, typicals, curb ramp details for 14 curb ramps, layout, signing and striping, and traffic signal modifications.

SR-210 / Pepper Avenue Interchange, Rialto,
California
Marie served as project manager responsible for the
preparation of a combined PSR/PR, an environmental
document, and PS&E for a new diamond interchange
on SR-210 and extension of Pepper Avenue. The
project included development of geometrics and
geometric approval drawings, a detailed traffic
impact analysis including forecasting and modeling,
preparation of a combined Project Study Report/
Project Report, fact sheets for exceptions to
both advisory and mandatory standards, utility
modifications to existing and planned facilities,
risk analysis, surveys, right of way engineering
and acquisition, a traffic management plan, stage
construction plans, three new signals, drainage and
storm water data reports, location hydraulic and
summary floodplain encroachment report, landscape
architecture, geotechnical investigation and study,
hazardous materials investigation and study,
preparation and coordination of technical studies
leading to an environmental document meeting CEQA
and NEPA requirements, and mitigation measures for
sensitive species protection during construction.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 35
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
François Zugmeyer, PE | Storm Drain / Hydrology Task
Leader
Francois has over 50 years of experience in public works projects and site development including transportation, hydrology, hydraulics, storm water, and grading. His experience in surface water and drainage projects includes hydrology, hydraulics, flood plain analyses, flood control, reservoir operation, storm drain design, runoff treatment, and water resources planning. His experience in transportation projects is for both the planning and design phases and includes local city street projects and freeway and interchange projects. The city street projects have included roadway widening, pavement rehabilitation, and intersection improvements.

Project Experience:

Alicia Parkway and Marina Hills Drive Pavement
Rehabilitation Project, Laguna Niguel, California
DEA prepared final design PS&E for street
rehabilitation on Alicia Parkway from Highland Avenue
to Crown Valley Parkway and on Marina Hills Drive
from Niguel Road to Golden Lantern. The two projects
were prepared with three separate bid packages –
two for Alicia Parkway and one for Marina Hill Drive.

Alicia Parkway is a six-lane roadway with sidewalks
and landscaping. A total of 16 sheets were prepared
for the two Alicia Parkway bid sets including title,
typicals, curb ramp details for 14 curb ramps, layout,
signing and striping, and traffic signal modifications.

The pavement rehabilitation generally included
two types, one being cold milling with rubberized
asphalt overlay and one including full depth (13”) of
replacement structural section. Francois served as
senior civil engineer.

Street Reconstruction Project, Zone G, Lomita,
California
DEA prepared design services for this street
reconstruction consisting of 20 street segments for a
total of 2.35 miles. The project proposes removal and
replacement of existing asphalt concrete pavement,
removal of unsuitable base material, new base
preparation, milling for specified areas, and asphalt
concrete overlay. It also includes construction of
36 curb ramps to meet ADA standards. The project
was divided into two bid sets with four phases to
accommodate a separate waterline project the City
is planning. The 26 plan sheets consisted of title,
typical sections, layouts, curb ramp details, and
signing and striping plans. Some streets are planned
for cold milling and overlay while others are planned
for complete structural section replacement. Francois
served as senior civil engineer.

MacArthur Boulevard and University Drive
Pavement Rehabilitation, Newport Beach,
California
The City desired to improve the wearing surface
of MacArthur Boulevard and University Drive
and identified the project through their Pavement
Management Program indications. The rehabilitation
extended 4,050’ on MacArthur Boulevard and
2,450’ on University Drive. The City also desired to
reconstruct deteriorated concrete flatwork, upgrade
pedestrian facilities to ADA and restripe using the new 6” stripes with a slightly changed cross section. DEA
prepared plans for pavement rehabilitation including
50’ cross sections and plan and profile. Francois
served as project engineer.

Archibald Avenue Improvements at SR-60
Interchange, Ontario, California
The Archibald Avenue Improvements project goal
was to reduce congestion by widening the existing
northbound and southbound road to add two left turn
pockets, modifying the existing Archibald Avenue
undercrossing to accommodate the additional
lanes, widening the on- and off- ramps, and adding
a bike lane. Responsibilities included project cad
management and providing support preparing stage
construction/traffic handling plans. Francois served as project engineer.

I-15 / Cajalco Road Interchange Reconstruction,
Corona, California
Franois served as project engineer for the drainage
and Storm Water Data Report (SWDR). The City of
Corona proposed the reconstruction of the existing
modified diamond interchange to a partial cloverleaf
interchange. Working as a subconsultant DEA was
responsible for the final engineering for all drainage
and stormwater improvements for the interchange
project.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 36
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Kim Rhodes, PLA | Landscape Architect Task Leader
Kim is a California registered, award-winning landscape architect, practice leader and vice president with DEA. For the past 39 years, she has been responsible for landscape architectural design and management on numerous projects, including design and planning for parks, trails, streetscapes/roadways, sports facilities, transportation corridors, structure aesthetics, schools and universities, commercial, residential, and industrial developments. She manages large, multi-disciplinary projects including on-call services contracts for Caltrans , Walt Disney Imagineering, and the City of Los Angeles.

Project Experience:

Caltrans District 8 On Call Landscape
Architectural Services, Riverside and San
Bernardino Counties, California
Kim served as project manager under a five-year
contract with Caltrans District 8 to provide landscape
architectural services on various projects in Riverside and San Bernardino Counties. She was responsible
for daily coordination with Caltrans landscape
architects to ensure project scheduling, prioritization of tasks, subconsultant deliverables, specification
data, cost estimating criteria, design modifications,
and invoicing.

Main Street Wall Aesthetics, Lake Elsinore,
California
DEA landscape architects, in collaboration with Hunt
Design prepared conceptual designs for the I-15 /
Main Street abutment wall aesthetics. Kim served as
project manager.

The Tracks at Brea, California
As project manager, Kim and her team prepared
conceptual and final construction documents for
four miles of Class I meandering trail through an
abandoned rail corridor in Brea. Segments 2-4 include
work between Brea Boulevard and Birch Street and
incorporates both hard and soft surface trail, native
plantings, site furnishings, a lighted parking area,
restroom building, plaza space, community gardens,
bioswale, fitness area and interpretive signage. The
site underwent soil remediation efforts prior to the
construction of the trail. The project was a multiple
award winner including an ASLA Honor Award for
design.

Soto Street Widening, Los Angeles, California
Kim provided quality assurance/quality control of
the landscape architecture plans for the Soto Street
Widening from Multnomah Street to Mission Road.

The objective was to widen Soto Street from two
lanes to four lanes to relieve traffic congestion,
improve safety by implementing a retaining wall to
help keep hillside debris off the roadway, and to
beautify the corridor. The project will include new
sidewalk and street trees on both sides of Soto
Street, and a Class 4 protected bikeway which will
greatly improve vehicular and bicycle mobility and
safety. The project requires coordination with the Los
Angeles Department of Transportation (LADOT), Los
Angeles Department of Water and Power (LADWP),
Council District 14 for community outreach, and with
the recently completed Soto Mission Bridge removal
project and pending Soto Valley bridge widening
and street improvement project. The retaining wall
to be built on the east side of Soto Street and is
approximately 2,150 feet in length with a varying
height ranging from 8 to 40 feet. The retaining wall
system proposed will consist of cantilevered soldier
pile design and tie back support anchors. The project
also includes the implementation of landscape
improvements, site furniture, hardscape and wall
aesthetics.

Mouet Park, Santa Ana, California
Kim served as principal-in-charge for Mouet Park,
a 2-acre neighborhood park in the city of Santa
Ana. DEA was provided a conceptual design of
the park by the city and worked to prepare final
plans, construction administration, and community
outreach. The design includes walkways, playground
equipment, a skatepark, half-court basketball, a picnic area, a shade structure, a rock bioswale, California
friendly plants, drip irrigation, low impact development drainage and lighting.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 37
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Armen Ware, EIT | Civil Designer: Armen is a transportation engineering designer with five years of experience in the construction industry. While in construction, he successfully completed a variety of projects ranging from central utility plants to multi-story mixed use buildings, specializing in cost estimation, project pursuits, MEP (BIM Coordination), structural steel, and other high value trades of work. He possesses construction related skills and has practical knowledge of transportation design.

Project Experience:
■ Liechty Middle School, Los Angeles
■ Round 3 Elden Elms & Path Villas Design, Los Angeles
■ Main St. and Sultana St. / Timberlane Ave. Traffic Signal, Hesperia ■ 24 ADA Curb Ramps, Redondo Beach
■ Narbonne Avenue Improvements, Lomita
Kimberly Schultz | Civil Designer: Marie has over 40 Kimberly is an engineering designer with a diverse range of experience including local roadway, multi-use trail, and transit/rail projects. Kimberly's experience spans both public and private projects, and she is well versed in both AutoCAD (Civil 3D) and Microstation (InRoads) design software. Her skills cover multiple phases of a project life-cycle, including initial due diligence, preliminary/ conceptual designs and reports, preparing final improvement plans, and assisting with submittal reviews and plan clarifications during construction.

Project Experience:
■ Jefferson Blvd. Complete Streets, Los Angeles
■ Diaz Rd. Expansion, Temecula
■ San Sevaine Trail, Phase 1, Fontana
■ Soto Street Widening, Los Angeles,
■ Santa Gertrudis Creek Trail, Temecula
Suzanne Moubayed, EIT | Civil Designer: Suzanne has 11 years of civil engineering experience. Her responsibilities include preparation of project development reports, plan development, feasibility study analysis, structures design, roadway design, alternative development and analysis, quantities and cost estimating, roadway geometrics, ADA requirements, identification of right-of way needs and utility impacts. She is proficient in various softwares such as MicroStation, AutoCAD, InRoads, GEOPAK, OpenRoads Designer, and Excel.

Project Experience:
■ Fariview St. Widening Design and Bridge Replacement, Santa Ana ■ Alicia Parkway and Marina Hills Drive, Laguna Niguel
■ South Highland Avenue at Mango Avenue Traffic Signal Project, Fontana ■ Narbonne Avenue Improvements, Lomita
■ Liechty Middle School, Los Angeles
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 38
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Abigail Hartman, EIT | Civil Designer: Abigail is an engineering designer with experience in both public and private works projects. In addition to Civil 3D drafting and design principles, Abigail possesses applicable knowledge of and work experience in CPM scheduling and planning, earned value concepts, SOV generation, materials sourcing, proposal and take-off generation, general contracting, survey mapping and survey data processing, and safety program implementation.

Project Experience:
■ Jefferson Blvd., Complete Streets, Los Angeles
■ Main St. & Sultana St. / Timberlane Ave. Traffic Signal, Hesperia ■ Various Street Improvements, Los Angeles, California
■ 24 ADA Curb Ramps, Redondo Beach
■ Diaz Road Expansion, Temecula
Lander Pham, PE | Roadway Geometrics and Civil Engineer: Lander has 17 years of experience in public works projects and highway engineering and design. His experience includes the design of roadway geometrics, grading, drainage, details for pavement structural sections, construction details, retaining wall and sound wall plan and profile, stage construction and traffic handling, and pavement delineation. He also prepares detailed construction cost estimates including earthwork calculations by stage.

Project Experience:
■ Liechty Middle School, Los Angeles
■ MacArthur Blvd. and University Dr., Newport Beach
■ Narbonne Avenue Improvements, Lomita
■ Fariview St. Widening Design and Bridge Replacement, Santa Ana ■ Alicia Parkway and Marina Hills Drive, Laguna Niguel
Greg Kim, EIT | Civil Designer / ADA Specialist: Greg has 18 years of construction and project management experience in various city, state, and federal public works infrastructures projects. His experience includes engineering design and construction management for local agency bridge replacement, sidewalk improvement, safe routes to school, complete streets, and other transportation projects, gaining an understanding of ADA and pedestrian safety. He has a strong background in cost estimate, project schedule, quality control, and construction management.

Project Experience:
■ Jefferson Blvd., Complete Streets, Los Angeles
■ Various Street Improvements, Los Angeles, California
■ 24 ADA Curb Ramps, Redondo Beach
■ San Fernando and Chandler Bikeway, Burbank, California ■ Round 3 Elden Elms & Path Villas Design, Los Angeles
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 39
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Heath Habig, PLA | Landscape Architect: Heath is a senior landscape architect with 28 years of landscape architectural design experience including schematic design, design development, construction documentation, and construction support. Heath has worked on a wide variety of projects during his career and continues to pull from this experience while leading and coordinating with design staff on city parks and streetscapes, single family housing developments, senior living facilities and small commercial sites.

Project Experience:
■ Morningstar Senior Care Facility, Mission Viejo
■ I-605 Soundwall, Long Beach
■ Mouet Park, Santa Ana
■ Bike and Pedestrian Trail Project, Garden Grove
■ Elden Elms and Path Villas Los Angeles, California
Ryan Williams, EIT | Civil Designer: Ryan is a civil engineer-in-training with 10 years of experience in various aspects of engineering including design, modeling, and field work for both the private and public sector clients. His experience encompasses a wide range of civil design elements including sewers, potable water distribution piping, water storage tanks, storm drain networks, roadway, ADA compliance, and grading improvements.

Project Experience:
■ Liechty Middle School, Los Angeles
■ 24 ADA Curb Ramps, Redondo Beach
■ Diaz Road Expansion, Temecula
■ OCTA Bicycle and Pedestrian Trail Project, Garden Grove ■ Jefferson Blvd., Complete Streets, Los Angeles
Shon Heern, PE | Constructability: Shon has 27 years of experience in construction project management, estimating of design and construction costs, and contract administration-related work for construction projects including PCC paving, asphalt paving, and bridge rehabilitation projects with significant highway experience. He is responsible for leading and managing multidiscipline engineering and construction project teams of up to 50 people to successfully deliver results that meet the goals and objectives of his clients.

Project Experience:
■ I-5 / Rose Quarter Improvement Project, Portland
■ Sisemore Road Bridge, Deschutes County
■ Seven Devils Road: Whiskey Run Lane, Coos County
■ US-101 / OR-38 Curb Ramps, Oregon
■ I-5: California State Line Pavement Rehabilitation, Ashland Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 40
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Jon-Sen Oen, CID, CLIA | Senior Irrigation Designer: Jon is a certified commercial irrigation designer, certified landscape irrigation auditor, and a partner with the U.S. Environmental Protection Agency’s (EPA’s) WaterSense program. For 26 years, he has worked on a wide variety of irrigation projects including streetscapes, interchanges, parks, hotels, residential, and commercial developments including preparing irrigation master meter plans for various master planned community developments.

Project Experience:
■ On-Call Landscape Archictectural Services, Pasadena
■ I-605 Soundwall, Long Beach
■ Pickleball Courts, Temecula
■ Burbank Boulevard Streetscape Enhancements, Burbank
■ Main Street Corridor Master Plan, Lake Elsinore
Danny Wang | Irrigation Designer: Danny is a landscape designer at DEA with 17 years of experience using AutoCAD, Adobe Pho-toshop, and Adobe Illustrator to assist him in the production of construction documents. Danny has been involved in numerous aspects of landscape architecture including public parks, streetscapes, trails, residential, commercial development, and construction management.

Project Experience:
■ I-5 / Washington Boulevard Interchange, Commerce
■ The Tracks at Brea
■ On-Call Landscape Architectural Services, Caltrans District 8 ■ I-15 / Cajalco Road Interchange Improvement, Corona
■ Mouet Park, Santa Ana, California
Rachel Wells | Landscape Designer: Rachel has seven years of professional landscape design experience with an emphasis on transportation projects including corridor master plans, gateway development, highway planting, irrigation and erosion control plans, and transportation art. She is currently involved in the design of several high-profile interchanges including the five-mile Bi-County project. Additionally, Rachel has been involved with the design of several transportation projects ranging from single interchanges to expansive corridors.

Project Experience:
■ Soto Street Widening
■ Morningstar Senior Care Facility, Mission Viejo
■ I-215 Bi-County, San Bernardino County,
■ Demonstration Garden, Palm Springs
■ Topaz Streetscape, La Quinta
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 41
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
Kent Groh, PLA | Survey Task Leader: Kent is a successful and reputable professional land surveyor who is well respected in the land surveying and geomatics community. He has over 30 years of technical management and leadership experience in the survey industry and possesses a keen attention to detail while effectively prioritizing multiple and competing tasks and responsibilities. He has been responsible for developing the framework of a survey department and has experience overseeing the daily production of both office and field staff.

Project Experience:
■ SR-22 Improvement Project, Orange County
■ Diaz Road Expansion, Temecula
■ I-10 Grove Avenue Interchange PA/ED Phase, Ontario
■ I-215 / Placentia Avenue Interchange, Riverside County ■ Phelan Road 12 Mile Widening Project, San Bernardino County Joseph Wideman, PLS | Survey Manager: Joe is an experienced project manager and professional land surveyor with 18 years of experience on projects in northern and southern California. His range of tasks on numerous projects has included cost estimating, research, boundary, topography, and construction staking. Joe has also trained and managed teams for the field and has a history of leading through example. His customer service and technical background make him a valuable team member when interacting with clients and crew members.

Project Experience:
■ SR-22 Improvement Project, Orange County
■ Hollywood Park, Inglewood
■ Olympic and Broadway Development, Los Angeles
■ LAX 3D Laser Scanning Survey, Los Angeles
■ Diaz Road Expansion, Temecula
Jerry Woodrow, PLS, CFedS | Surveyor: Jerry is an associate, senior project surveyor, and party chief at DEA with 48 years of experience. He has worked on a variety of projects including large transportation, bridge, rail, pipeline and land development projects. He is experienced in all aspects of land surveying including construction, boundary, topographic, aerial control, 3D laser scanning, ALTA, and GPS surveying. He is also adept in computing and analyzing survey field data to Caltrans standards, utilizing Caltrans’ field coding, and utilizing Microstation and InRoads.

Project Experience:
■ On-Call Surveying and Map Checking Services, Pasadena ■ Caltrans On Call Surveying and Right-of-way Engineering Services ■ Sepulveda Bridge Widening - QA/QC Surveys, Manhattan Beach ■ SR-91 Corridor Aux Lane Construction Survey, Corona
■ I-10 Pepper Avenue Interchange, Colton
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 42
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN
George Enriquez | Subsurface Utility Engineering / Potholing:

Kent George Enriquez has 18 years of experience in the Subsurface Utility Engineering (SUE) field. His expertise is in utility designation and task oversight and delivery while ensuring quality submittals. This includes data collection from utility owners, project planning, and support for survey and CAD departments. George has led several projects working with California clients including on-call contracts with Caltrans District 7, Caltrans District 12, and the Eastern Municipal Water District.

Project Experience:
■ Narbonne Avenue Main Water Replacement Project, Lomita ■ I-5 Widening Project Yale Street to Route 55, Orange County ■ Roadway Design On-Call, Orange County
■ On-Call Roadway Design and Related Project Development and Construction Support Services, Los Angeles County
Alahesh Thurairajah, PE, GE | Geotechnical Engineer: Alahesh is a geotechnical project manager with 13 years of experience on California transportation projects. He has provided geotechnical design/construction recommendations for 250+ bridges including 15 HBP bridges, 300+ standard and non-standard retaining walls, and 100+ miles of roadway. He has prepared Foundation Reports and Geotechnical Reports in compliance with Caltrans standards for numerous bridge/roadway projects. Alahesh has managed several HBP bridge projects giving him a thorough understanding of the Caltrans Local Assistance Process which has resulted in efficient report approvals.

Project Experience:
■ Golden Avenue Bridge Replacement (HBP), Placentia
■ Four Bridge Replacements (HBP), Orange County
■ Crown Valley Parkway Widening Project, Laguna Niguel
■ SR-55 Improvement Project, Orange County
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 David Evans and Associates, Inc. | June 13, 2024 | 43
On-Call Professional Services
City of Gardena GENERAL CIVIL ENGINEERING DESIGN

APPENDIX
Agreement Exceptions
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 10 | P a g e

SECTION VIII
APPENDIX “A”
Gardena Standard Professional Services Agreement
Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH XYZ
This Agreement is entered into this day of , 2024,
by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
 General Civil Engineering Design
 Construction Management and Inspection
 Traffic Engineering
 Architecture and Landscape Architecture
 Geotechnical Engineering, Geology and Material Testing  Staff Augmentation
B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately promptly upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California practicing under similar circumstances, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 3
under this Agreement.

Docusign Envelope ID: 2423B01D-C565-49F1-BDC3-CE06845E3D12 Consultant Agreement with XYZ Page 4

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

← All documents from this meeting