Cities Index.
Agenda packet

Gardena City Council
September 10, 2024

Document
Agenda packet
Meeting
September 10, 2024
Body
Gardena City Council
Pages
48
Original file
206.5 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

I, Gerald J. Stock, PE, TE, am executive vice-president and owner of HCI, a California corporation. I am authorized to commit to contractual terms and conditions resulting from this submittal. My email address is [email protected].

Our Senior Engineer, Mr. Scott Ma, PE, TE, will be assigned as the Project Manager (main point of contact) in responsible charge of on-call professional engineering consulting services that are requested by the City of Gardena. Scott’s email address is [email protected].

For most requested services, HCI proposes to serve the City of Gardena as a sole prime consultant on specific projects and does not intend on using any sub-contractors, with exception to obtaining City-requested traffic count data and possible design potholing for new, larger traffic signal pole foundations to ensure they are clear of underground utilities. All personnel listed in our proposal are available and headquartered at our Tustin office.

As HCI is currently serving several local agencies with on-call traffic engineering services, HCI is very familiar with most City requirements under their Professional Services Agreement. HCI respectfully requests certain exceptions to the agreement, as shown on the one agreement page attached in the appendix. HCI will provide updated insurance and business license requirements at the time of execution of a new agreement for a three-year contract.

By signing this cover letter of transmittal below, I attest that all information submitted in the attached qualifications proposal is true and correct. On behalf of HCI, we sincerely appreciate the opportunity to submit the attached proposal package and being considered to serve your community.

Very truly yours,
HARTZOG & CRABILL, INC.

Gerald J. Stock, PE, TE
Executive Vice President
City & Traffic Engineering Services

Attachments: Qualifications Proposal
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA i
Table of Contents
Description Page No.(s)
 Cover Initial Pages
 Cover Letter Initial Pages
Table of Contents: Initial Pages
 Firm Qualifications and Experience 1 - 5
 Key Personnel and Experience: 6 - 9
 Organization Chart: 10
 Similar Projects / Services: 11 - 16
 References: 17
 Fee Schedule: 18
 Resumes: 18
 Agreement: 18
Attachments:

HCI Schedule of Hourly Rates
Full resumes
Request to Review Exceptions to Agreement
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 1 ends

Hartzog & Crabill, Inc. (HCI) is a private traffic engineering consulting firm headquartered in Tustin, CA, and has been in business since 1993 offering the same types of professional traffic engineering services under the same name.

HCI understands the City of Gardena intends to establish a team structure of approved consultant firms under a 3-year program starting with Fiscal Year 2024-25 (start in September) through 2026- 27 (end in August) for each of the specialty areas stated in the RFQ. We also understand that the agreement may be renewed at the City’s discretion for up to two (2) additional years subject to satisfactory performance during the initial 3-year term. HCI is proposing to provide on-call engineering services specifically for: Traffic Engineering Services.

FIRM QUALIFICATIONS & EXPERIENCE:

DESCRIPTION OF FIRM
HCI is a traffic engineering consulting firm specializing in serving local government agencies with a full array of engineering services, including serving several of our client cities as contract City Traffic Engineer, contract City Engineer, and “on-call” City Traffic Engineer. Specific to traffic engineering and transportation planning, HCI performs various traffic studies including, but not limited to, the following:

Preparation and review of traffic signal and striping design plans, specifications, and estimates (PS&E); warrant analyses for traffic control devices (i.e., traffic signals, Stop signs, marked crosswalks, flashing beacons/RRFBs); engineering and traffic surveys for establishing speed limits; development and design of traffic signal coordination systems; on-going remote and local (off-site/on-site) management of traffic signal systems; preparation of traffic control plans; and assist cities with coordination of services completed by their traffic signal maintenance contractor.

HCI also provides construction observation services on behalf of our client cities relative to the installation of new/modified traffic signals, lighting, copper/fiber optic interconnect communications, and signing & striping, in order to verify compliance with approved PS&E.

Since its inception in 1993, HCI has proven itself as a leader in client satisfaction through successful project completion. This is evident in the continued and long-standing relationships we have maintained with our numerous client cities. The successes are attributed to the "hands on" approach that was demonstrated by our founding firm principals, Mr. Trammell Hartzog and Mr.

Jerry Crabill (retired). It is important to note, Mr. Gerald J. Stock (‘Jerry’) is the current owner of HCI. Mr. Stock is a registered Civil and Traffic Engineer whose experience covers over (30+) years. Mr. Stock has been serving the City of Bellflower as both contract City Engineer and City Traffic Engineer for over (24) years.

In addition to our technical expertise, a cornerstone of HCI’s success is our work ethic, loyalty to our client cities, completion of assigned tasks on schedule, and ability to effectively communicate with the public, City staff, and elected officials.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 2 ends

FIRM QUALIFICATIONS & EXPERIENCE: (continued)

TYPICAL SERVICES
Working with numerous Southern California cities, HCI has been responsible for directing the activities of Traffic Divisions, providing expertise to City Engineering and Planning staffs, and responding to requests, inquiries and concerns of citizens and City Council members. Our overall services available to the City of Gardena include the following:
 Traffic signal design
 Signing & striping design
 Warrant analyses for traffic control devices, such as traffic signals, Stop signs, crosswalks  Traffic signal LOS operational analyses
 Develop and implement traffic signal timing plans
 Develop, design and implement traffic signal coordination systems  Remote and local (off-site/on-site) management of traffic signals  Traffic management plans (traffic control plans)
 Review of traffic impact analyses
 Provide construction observation/management services on behalf of the City on all proposed traffic improvements, development, site and traffic management plans to ensure conformance with applicable standards (City, AASHTO, Cal. MUTCD, etc.)  Coordination of activities of our client cities’ traffic maintenance contractor  Engineering and Traffic Surveys for establishing speed limits  Other traffic-related impact reports, surveys, and analyses From our Tustin office location, HCI continuously monitors (12) local agencies’ citywide traffic signal systems. The local agencies where HCI monitors and operates the coordination timing for traffic signals are the following cities: Aliso Viejo, Cerritos, Cypress, Indian Wells, La Palma, Laguna Hills, Moorpark, Rancho Santa Margarita, San Juan Capistrano, Stanton, Tustin, and Yorba Linda.

LOCATION
The firm’s Tustin office location, located in Orange County near the Santa Ana (I-5) and Costa Mesa (SR-55) Freeway interchange, provides quick, easy access to the majority of our client cities.

The office employees total (12) individuals who comprise a complete staff of professional engineers and support technicians where all design work products are prepared using state-of-theart AutoCAD software and personal office computers from this office location.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 3 ends

FIRM QUALIFICATIONS & EXPERIENCE: (continued)

PERSONNEL
All of our personnel are available and headquartered at our Tustin office. In regards to Cityrequested On-call Traffic Engineering and Design Services, as mentioned these engineering services will be managed by our Senior Engineer, Mr. Scott Ma, PE, TE, who is available and works closely with our company firm principal, Mr. Jerry Stock, PE, TE, as well as our Associate Engineer, Senior Designers, and Traffic Signal Systems Supervisor and Specialist.

Scott is currently performing similar on-call Traffic Engineer, and design/plan-checking services for the Cities of Lake Forest and Hermosa Beach; however, his availability to serve the City of Gardena is still at 40%. Our other key staff is available to serve the City at minimum 20% and up to 50%.

Further details of our personnel staff are provided in the following section (starting on Page 6).

It is important to note, our proposed staff is distinctly ready to serve the City of Gardena Public Works Department, and is immediately available to perform any of the requested on-call civil and traffic engineering services with minimal supervision (including any backload of City work).

DISCLOSURES
HCI does not have any “Conflict-of-Interest” in working with the City of Gardena. HCI has no potential conflicts to disclose, and is not working on any projects (for another company or agency) that the City of Gardena needs to review on behalf of the City. Lastly, HCI also does not have any disciplinary actions against our firm to disclose.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 4 ends

FIRM QUALIFICATIONS & EXPERIENCE: (continued)

PROJECT CONTROLS
A tenet of HCI is our belief that when acting on behalf of the City of Gardena, we serve as staff associates, or as an extension of City staff, in the well-being of the City. As such, we try our very best to always streamline the design and plan review process, as well as any required traffic signal management/support tasks, and also believe we have a commensurate responsibility to the public for high quality performance of our services, and quality assurance when reviewing others’ plans.

All of our staff that will serve the City of Gardena have a thorough knowledge and proficiency in local agency municipal codes, current State (Caltrans) Standard Plans and Specifications, Highway Design Manual, Highway Capacity Manual, California Manual on Uniform Traffic Control Devices (CA MUTCD), policies and procedures for ADA regulations, traffic signal timing, traffic engineering modeling and methodologies, County/City traffic standards and methodologies, and the State of California Vehicle Code.

Upon request by the Project Administrator, our team will provide the City with all materials and labor to perform the requested on-call traffic engineering and traffic signal operations support services and conform to industry standards.

As part of our on-call traffic engineering and signal management/support services, HCI staff will remain available to provide assistance to the City Project Administrator and/or contractors during the construction phases, as applicable, either in person, or via email or phone.

As we specialize in traffic design as well, HCI prides itself on timely design phase submittals, complete internal plan-checks of our own designs or other consultants’ designs, and consistently providing a quick turn-around for addressing comments. We typically provide 75%, 90% and final submittals on our designs within 4 to 8 weeks, and rarely have significant comments on our own design plans. Upon review and final approval by the City of the preliminary engineering plans submitted, a final set of the plans, specifications, and construction estimate (PS&E) are typically submitted within a week, including a construction item list with quantity extensions and definitions suitable for bidding. Our typical turn-around for plan-check services is within one to two weeks from receipt.

Similarly, HCI can control costs by providing accurate and timely invoices through internal control measures. HCI prides itself on consistently working with the City to quickly address requests and staying in budget. HCI’s ability to take a request from the City for a traffic design all the way through completion of construction, including signal timing and operations tasks, ensures greater accuracy, efficiency, and timely results.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 5 ends

FIRM QUALIFICATIONS & EXPERIENCE: (continued)

QUALITY CONTROL/QUALITY ASSURANCE (QA/QC)
HCI employs the following QA/QC program that outlines the definition of roles, responsibilities, expectations, review requirements, and quality standards of our services, documents, and procedures in order to ensure a high standard of work:
a) Service Request or Plan Review:

Our service tasks and submitted documents go through three levels of review prior to response: Initial Peer Review, Project Manager Review, and QA/QC Review. This three-tiered review allows for error mitigation on three separated levels of detail: ground level (signal management check, drafting, calculations, and document formatting), project management level (signal management decision, design and project intent compliance) and quality assurance level (signal management confirmation, completeness of document and ensure “biddable” or “implementable” plans). Our service tasks and plan checks look at the 5C’s: consistent, correct, clear, constructible, and complete. b) Communication:

HCI staff will stay in constant communication with the City Project Administrator to ensure we understand the service request and have necessary milestones in place and that we meet those milestones. As previous clients can attest to, our team will allocate as many key staff/support staff to the project to ensure the schedule is maintained and that the City is satisfied with the delivery of the project. We make it a point to accommodate our client's needs, and we consistently strive for satisfaction with our ability to deliver. By making ourselves consistently available to the City, we avoid delays and any defects to the final PS&E or traffic signal services that could occur as a result of miscommunication or misunderstanding.
c) Scheduling:

For the remote possibility there is a delay, our project manager will develop strategies to bring the project back on track using necessary means at no additional cost to the City.

Above all else, clear communication will be the critical item in bringing any schedule slippage back on track. Our staff will actively communicate with the contract officer and affected parties to reschedule or reallocate resources in an effort to expedite all necessary items. Tasks can be reorganized to allow for staggering of work items.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 6 ends

KEY PERSONNEL & EXPERIENCE:

HCI TEAM ORGANIZATION AVAILABLE TO SERVE THE CITY OF GARDENA FOR ONCALL TRAFFIC ENGINEERING AND DESIGN SERVICES:

Firm Principal In Charge of Agreement/Contract:

Mr. Jerry Stock, PE, TE, Principal Engineer
Key Staff:

Mr. Scott Ma, PE, TE, Senior Engineer (Project Manager) Mr. Michael Vallado, Associate Engineer
Mr. Greg Cabey, Traffic Signal Systems Supervisor
Mr. Todd Hartzog, Senior Designer
Mr. Dave Martorano, Senior Designer
Mr. Michael Powers, Traffic Signal Systems Specialist
As shown above, in regards to City-requested On-Call Engineering Services that may include Traffic Engineering services for design, operations, timing and traffic signal plan-check services, these requested on-call engineering services will be managed by our Senior Engineer, Mr. Scott Ma, PE, TE. Scott works closely with our Associate Engineer and Senior Designers, as well as our Signal Systems Supervisor and Specialist in the majority of our design projects.

As mentioned, HCI staff is comprised of (12) engineering professionals and technicians who have the proven ability and expertise to meet the ever-changing, challenging needs of the modern city.

All HCI personnel listed are all headquartered at our Tustin office. It should be mentioned, HCI and assigned key professional engineering staff are properly registered/licensed to practice in the State of California and will comply with all federal, state, and local laws and ordinances applicable to the work assigned.

For most requested services, HCI proposes to serve the City of Gardena as a sole prime consultant on specific projects and does not intend on using any sub-contractors, with exception to obtaining City-requested traffic count data and possible design potholing for new, larger traffic signal pole foundations to obtain clearance of underground utilities.

Below are ‘summary’ qualifications of our proposed staffing plan per our textual organization chart above (full resumes attached):

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 7 ends

KEY PERSONNEL & EXPERIENCE: (continued)
Mr. Gerald J. Stock, PE, TE, HCI Executive Vice-President, Principal Engineer Mr. ‘Jerry’ Stock is a registered professional Civil and Traffic Engineer with more than (34) years of municipal engineering experience. If selected, Jerry will serve as the firm Principal-In-Charge of the new agreement with the City of Gardena for the requested on-call engineering consulting services. Jerry presently serves the City of Bellflower as contract City Engineer and City Traffic Engineer since November 2000. Jerry has been responsible for completing the majority of our Engineering and Traffic (E&T) Survey for Speed Limits for numerous local Southern California agencies.

Mr. Scott Ma, PE, TE – Senior Engineer (Project Manager) Mr. Scott Ma is a licensed, professional Civil and Traffic Engineer registered in the State of California and brings over (24) years of engineering experience. Scott is a senior engineer that works in our HCI Tustin office, and is currently providing part-time contract City Traffic Engineer services to Cities of Lake Forest, as well as on-call traffic engineering services to the City of Hermosa Beach. As mentioned, Scott will be assigned as Project Manager to perform the requested on-call engineering consultant services for the City of Gardena.

Scott’s experience includes reviewing and conducting a variety of traffic studies including but not limited to, warrant analyses, preparing and reviewing traffic impact analyses reports and recommendations, responding to community requests such as crosswalks, traffic signals, stop signs, parking matters, and also performing project management that includes the final design preparation and submittal of project plans, specifications, and estimates (PS&E). His experience also includes overseeing numerous aspects of our client cities’ consulting service requirements in regards to review of traffic-related requests, analyses and operational studies, permits, and other daily duties requested.

Scott’s email address contact information is [email protected].

Mr. Michael A. Vallado – Associate Engineer
Mr. ‘Mike’ Vallado provides assistance to Mr. Jerry Stock, and Mr. Scott Ma in the area of preparation of traffic signal and left-turn phasing warrant analysis reports, traffic signal operations (LOS) and queuing analyses, multi-way Stop sign analyses, and related project specifications.

Mike brings over (25) years of experience specifically related to traffic-engineering and signal design. Five of these years were devoted to running the City of Glendora's Traffic Engineering section, while the past (20) years have been with HCI. His primary responsibilities with HCI include preparing signal analysis reports & recommendations, warrant analyses and evaluations, project specifications, and final review & preparation of plans, specifications, and estimates to our client cities.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 8 ends

KEY PERSONNEL & EXPERIENCE: (continued)
Mr. Greg Cabey - Traffic Signal Systems Supervisor
Mr. Cabey brings over (30) years of traffic signal experience to the HCI team and will be involved in certain aspects of requested traffic signal timing and operations tasks. Prior to HCI, Greg was a Lead Technician for Peek Traffic for over (12) years, and is certified as an International Municipal Signal Association (IMSA) Level III Traffic Signal Technician. It should be noted that Greg spent much of his time at Peek Traffic within the Gardena area, as this was one of several areas assigned to him. This HCI and Peek Traffic experience has allowed him to continue retaining in-depth knowledge on the types of controllers in the area’s traffic signal system. His extensive field experience and familiarity with signal systems and timing will aid in the complete success of any requested traffic signal design and signal timing related services.

Mr. Todd Hartzog – Senior Designer
Mr. Todd Hartzog provides assistance to our team in the area of signal design. Todd brings over (30) years of experience specifically related to traffic signal and signing/striping design, traffic signal operations/monitoring assistance, and overall traffic engineering services. His responsibilities also include CAD designs on traffic projects, including traffic signal, interconnect, and signing and striping plans.

Mr. David Martorano – Senior Designer
Mr. David ‘Dave’ Martorano provides assistance to our team in the area of traffic engineering design, signing & striping design, and traffic control plan preparation. Dave has been with HCI for (30) years with overall experience in traffic engineering design. His responsibilities with HCI include project research and full AutoCAD design on all traffic-related projects, including traffic signal, interconnect, signing/striping, and traffic control plans.

Mr. Michael Powers - Traffic Signal Systems Specialist
Mr. Michael Powers brings over (30) years of traffic signal experience to the HCI team and will also be involved in requested traffic signal timing and related trouble-shooting & observation tasks. Michael is certified as an International Municipal Signal Association (IMSA) Level III Traffic Signal Technician. Prior to HCI, Michael worked for Siemens (Republic) as a Lead Technician for over (20) years.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 9 ends

KEY PERSONNEL & EXPERIENCE: (continued)

SUB-CONSULTANTS
In terms of possible City-requested traffic count data collection, HCI proposes to use National Data & Surveying (NDS) Services, headquartered in Los Angeles, CA to collect any required vehicular traffic and pedestrian data as part of City-requested surveys, studies, and investigations.

Founded in 1989, NDS was established to deliver accurate and professional solutions to their client’s traffic, transit and GIS/GPS data collection needs. NDS has over (35) years of successful operations, and an outstanding team of (100) professional full time employees that have established them as the foremost, full service traffic and transit data collection company on the west coast. NDS is certified as a SBE by the State of California.

HCI has successfully partnered with NDS on numerous data collection projects over the last (25) years, realizing their competitive pricing on their efficient data collection.

Projects that HCI has completed with NDS include data collection for numerous stop sign warrant analyses, traffic signal warrants analyses, left-turn phasing/delay warrant studies, citywide E&T speed limit surveys, citywide ADT flow maps, truck classification counts for TI calculations, traffic signal timing development (counts for free & coordinated timing), SYNCHRO Level-ofService (LOS) operational/queuing analyses, crosswalk analyses, video surveillance and parking studies. Upon request by the City of Gardena, HCI will use NDS to conduct count data collection specific to the requested task(s).

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 10 ends

ORGANIZATION CHART:

HCI staff is comprised of (12) engineering professionals and technicians who have the proven ability/expertise to meet the ever-changing, challenging needs of the modern city. As shown above, HCI is providing an organizational chart showing the relationship of the City of Gardena and our proposed consultant team. Our proposed personnel are all headquartered in our Tustin office and will remain during the term of the agreement. HCI is proposing as the prime consultant, with two sub-consultants: NDS and possibly Bess Testlab or C Below. National Data & Surveying Services, Inc. (NDS) may be used more frequently for requested traffic count data collection associated with reports, surveys, studies, and investigations. C Below or Bess Testlab will only be used as-needed/approved for design potholing of traffic signal pole foundations.

Traffic Signal
Monitoring
Jerry Stock, PE, TE
Scott Ma, PE, TE
Senior Engineer
Greg Cabey, Traffic Signals
Systems Supervisor
Todd Hartzog,
Senior Designer
Michael Powers, Traffic
Signals Systems Specialist
Principal-In-Charge of Agreement
Jerry Stock, PE, TE,
Principal Engineer
Project Manager
Scott Ma, PE, TE,
Senior Engineer
Traffic Signal Design &
Plan-Check, Signal
Operations/Coordination
Traffic & Transportation
Studies & Warrant
Reports, Exhibits
Jerry Stock, PE, TE
Scott Ma, PE, TE
Michael Vallado,
Associate Engineer

Dave Martorano,
Senior Designer
Sub-Consultants
NDS, Inc.
(count data)
C Below
(design potholing)
Bess TestLab, Inc. (
(design potholing)
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 11 ends

SIMILAR PROJECTS / SERVICES:

HCI has extensive experience in the development of traffic engineering plans, such as traffic signal design/modification, signal interconnect design, and signing & striping, as these are among our firm's primary service products. In the past recent years, our HCI project team successfully completed the following design plans:
• San Juan Capistrano – HCI recently completed a traffic signal modification design for Adams Streeter for the intersection of Camino Capistrano and Old Mission Road in 2024, which included signing/striping design, as part of the Arguello Way Beautification project. Construction is expected in 2024.
• City of Yucaipa – HCI recently completed a traffic signal installation design for the intersection of Oak Glen Road and Colorado Street in 2023. Construction is expected in 2024. • City of San Juan Capistrano – HCI recently completed a traffic signal installation design for the intersection of La Novia Avenue and Calle Arroyo in 2023. Construction is expected in 2024. • City of Bellflower – HCI recently completed two traffic signal designs in 2023: 1) intersection of Bellflower Blvd at Park St; and 2) intersection of Bellflower Blvd at Cedar St. Construction is expected in 2024. HCI also completed 4 other traffic signal designs along Lakewood Blvd in 2022. • City of Yucaipa – HCI completed a traffic signal installation design for the intersection of Live Oak Canyon Road and Outer Highway 10 South during the past year in 2022. HCI also completed 2 other traffic signal designs for the City: 1) Oak Glen Road at Sunnyside Drive Signal Modification in 2021; and 2) Oak Glen Road at 2nd Street Signal Installation in 2020. • Town of Apple Valley – HCI completed a traffic signal modification design for the intersection of Navajo Road and Powhatan Road in 2022 for adding protected left-turn phasing to the SB movement, and included a left-turn phasing warrant and LOS analysis. HCI also completed a similar traffic signal modification design for the intersection of Bear Valley Road and Deep Creek Road in 2021.
• County of Riverside/Caltrans – HCI completed a traffic signal modification design for the County/Caltrans shared intersection of Winchester Road and Thompson Road in 2021, which included signing/striping design, as part of an adjacent development project. • City of Bellflower – HCI completed 3 new traffic signal designs in 2020: 1) Bellflower Blvd at Harvard St.; 2) Bellflower Blvd at Mayne St.; and 3) Woodruff Ave at Lindale St. The designs included signing/striping and minor civil engineering work. Both Bellflower Blvd signals included decorative traffic signal equipment.
• City of Whittier – HCI completed a new/modified traffic signal design for the off-set Tintersection of Greenleaf Avenue and Putnam Street in 2019. The design included updating the existing signal, and including the adjacent offset T-intersection into one signalized intersection with special off-set overlap phasing. The design also included new video detection, EVP, signing & striping design, and minor civil engineering work.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 12 ends

SIMILAR PROJECTS / SERVICES: (continued)
HCI also has extensive experience in the preparation of traffic-related studies, such as traffic signal warrant studies, left-turn phasing warrant studies, Stop sign warrant studies, LOS operational/queuing analyses, Engineering and Traffic (E&T) speed limit surveys, as well as traffic signal timing, plan-checking services, and review of traffic impact analyses for our client cities. In the past recent years, our HCI project team completed the following:
• Cerritos – Multi-Way Stop Sign warrant analyses for 1 intersection in 2024. • Stanton – E&T Survey for Speed Limits. Completed in 2024. • Laguna Hills – Sight Distance Evaluation at 2 locations. Completed in 2024 & 2023. • Laguna Hills – Multi-Way Stop Sign warrant analyses for 2 intersection, as well as a separate roadway speed evaluation and marked crosswalk analysis, in 2023. • Laguna Hills – Prepared Traffic Signal Master Plan for 18 Intersections in 2023. • Coto de Caza – Sight Distance Evaluation. Completed in 2023. • Town of Apple Valley – Left-turn Phasing Warrant Analysis at Navajo/Powhatan in 2022. • Indian Wells – E&T Survey for Speed Limits. Completed in 2022. • Coto de Caza – Signing & Striping Roadway Evaluation. Completed in 2022. • City of Bellflower – 3 Left-turn Phasing Warrant Analyses on Foster Road in 2022. • City of Yucaipa – Multi-Way Stop Sign warrant analyses for 4 intersections in 2022. • City of Indian Wells – Multi-Way Stop warrant analyses for 2 intersections in 2022. • City of Stanton – Crossing Guard warrant analyses for 3 intersections in 2022. • City of Bellflower – Traffic Signal Warrant Analysis for Bellflower/Cedar in 2022. • City of Lake Forest – Marked Crosswalk Analysis for Catalina at Mariposa in 2021. • City of Bellflower – Left-turn Phasing Warrant Analysis for Bellflower/Park in 2021.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 13 ends

SIMILAR PROJECTS / SERVICES: (continued)
OVERVIEW AND APPROACH TO CITY REQUESTED SERVICES:

In general, HCI understands that the City’s on-call engineering consultant services may require development of construction documents for necessary roadway engineering plans, including traffic signal plans, signing and striping plans, and also may include related plan-check and traffic studies.

More specifically, we understand that the City is interested in selecting consultants who have the civil & traffic engineering experience and expertise to provide as-needed engineering services, including traffic signal design, signing & striping design, and possibly related plan-check services, and review of traffic analyses.

We also understand the purpose of developing a qualified list of consultants capable of performing this work is to have a ready contract and required insurance in place to streamline the process of contracting for engineering and design work on various projects. These services are intended to be an on-call/as-needed basis to supplement staff’s efforts where specific expertise is required or time constraints necessitate consultant assistance.

HCI provides these and other types of traffic engineering services, including traffic design, traffic signal timing, warrant analyses, construction observation services, and other traffic-related duties in a comprehensive and timely manner.

HCI does possess the expertise, experience, and familiarity in successfully providing the requested traffic engineering design services, including working with various regional agencies such as Los Angeles County and Caltrans District 7. On the following pages, we have provided responses on our typical on-call engineering experience and capabilities below each type of possibly requested engineering consultant service that may be assigned by the City.

If selected, our Senior Engineer, Mr. Scott Ma, PE, TE, and our Associate Engineer, Mr. Michael Vallado, will serve the City of Gardena in providing design and/or recommendations and requested services to the City’s principal contact on an on-call basis. This team will ensure that consistent communication between the City of Gardena and HCI occurs regularly.

On-call Traffic Engineering Services
Our assigned staff that will serve the City of Gardena have a thorough knowledge and proficiency in local agency municipal codes, current State (Caltrans) standard plans and specifications, Highway Design Manual, Highway Capacity Manual, California Manual on Uniform Traffic Control Devices (CA MUTCD), policies and procedures for ADA regulations, traffic signal timing, traffic engineering modeling and methodologies, County/City traffic standards and methodologies, and the State of California Vehicle Code. Our team will provide the City with the materials and labor to perform the requested traffic engineering services and conform to these standards.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 14 ends

SIMILAR PROJECTS / SERVICES: (continued)
Under the direction of the City’s principal contact, or other approved staff member, HCI will be ready to provide on-call traffic engineering consulting services and address the following areas within the City of Gardena Public Works Department:

1. Provide traffic engineering design.

HCI has extensive experience in the development of traffic engineering plans, such as new traffic signal, traffic signal modification, signal interconnect, signing and striping, and traffic control plans, as these are our firm’s primary service products. For each of these types of plans, HCI includes technical provisions and engineer’s estimates that complement each plan set providing complete PS&E that is ready for construction bidding on time and within the approved schedule. Examples of our different types of designs can be submitted for the City’s review upon request.

2. Review, plan-check, and make recommendations on traffic plans and reports, and provide input relating to traffic issues on planning and development applications.

Our staff also has extensive experience in reviewing and analyzing several types of City and developer-related plans, as well as assimilating the findings and recommendations into easily understood summations. Our experience and expertise also allows quick and complete site plan review for traffic engineering applications to determine conformance to traffic, parking, access, street and pavement, subdivision requirements, meetings with developers or contractors to resolve traffic issues.

It is noted that many development-related services such as the review of street improvement or traffic signal plans are project specific and are treated as recoverable project costs.

Upon request, HCI staff will render and remit a typed plan-check correction/clarification list (2 copies) to the Public Works Department within (10) working days from notification by the City for a typical development project.

3. When requested, prepare written engineering reports related to pedestrian traffic patterns, traffic installations, and traffic control devices such as STOP signs, traffic signals, crosswalks, speed zones, traffic control, and similar matters.

Our staff prepares numerous amounts of warrant analysis and traffic operations reports every year for various city agencies, such as, traffic signal warrants, left-turn phasing warrants, multiway stop warrants, operational level-of-service (LOS), queuing analyses, crosswalk warrants, traffic calming studies, Engineering and Traffic (E&T) surveys for speed limits, etc. HCI staff has obtained and analyzed data, prepared exhibits, and developed reports for literally hundreds of traffic studies. Sample reports can be forwarded to the City upon request.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 15 ends

SIMILAR PROJECTS / SERVICES: (continued)
Again, HCI staff has extensive experience in reviewing and analyzing all types of City and developer-related traffic studies and reports, as well as assimilating the findings and recommendations into easily understood summations.

4. Provide technical advice on traffic signal facilities, accident rates, new developments, and maintenance of traffic facilities.

HCI has the capability and range of expertise to provide technical advice to the City of Gardena on many traffic or transportation-related issues or facilities. HCI staff will complete the requested services in a thorough and efficient manner, on time and within the approved fee schedule.

5. Review proposed improvements for conformance to the City’s Traffic Standards.

As previously noted, HCI has the expertise to review proposed improvements, development, site, and traffic management plans (i.e., traffic control plans) for conformance to the City’s standards, from both a traffic engineering and civil engineering perspective.

6. Work closely with City staff, Caltrans, Los Angeles County, and local law enforcement agencies in analyzing traffic-related issues and mitigation.

A tenet of HCI is our belief that we serve as an extension of City staff and consider ourselves as associates in the well-being of the City. Through our successful work in other communities, HCI already has these relationships firmly established. One notable and particularly important relationship is working with Caltrans. HCI staff has been able to quickly contact the correct person for project development, along with other similar individuals at Caltrans District 7 as well as Los Angeles County, in order to resolve trafficrelated matters that affect our client cities.

7. Work with City staff and other consultants in developing, monitoring and providing input into traffic services.

Since our client base are primarily municipalities, we have extensive experience working with both City staffs and other city consultants in providing the support necessary to ensure that traffic services and transportation planning required by the City are met.

These associations also afford HCI the opportunity to learn and share new technologies, products and procedures with our client cities.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 16 ends

SIMILAR PROJECTS / SERVICES: (continued)

8. When requested, advise the City regarding traffic-related matters.

HCI’s collective experience and expertise in most aspects of traffic and transportation engineering allows our staff to provide advice and recommendations to our client cities on numerous traffic issues. If a new or unique situation arises, HCI staff does not hesitate in performing the research necessary to determine an appropriate action or recommendation.

9. Develop a prioritized list of traffic improvement projects for inclusion into the City’s Capital Improvement Program (CIP) and incorporate into existing project lists.

HCI has also worked with many of our client cities in identifying and developing long and short-range CIP projects consistent with the economic capabilities of the City. A fundamental goal of HCI in developing CIP projects is to provide City staff with that data necessary to make meaningful decisions at critical stages of the project’s development, in order to provide viable, achievable options. Consistently reaching this goal assists with resolving issues and problems associated with each project.

Possible traffic engineering candidate projects the City of Gardena may desire to consider or expand on include the following:
a.) Video surveillance of other major intersections or street segments. b.) Identification and analysis of potential critical intersections, improvement alternatives, and funding opportunities.
c.) An updated Signal Construction or Modification Priority List, including long-term maintenance and equipment needs.
d.) Implementation of citywide emergency vehicle preemption (EVP) systems. e.) Changeable message signs.
f.) Countdown pedestrian signal indications.

10. Other duties, as assigned by City Engineer or Director of Public Works.

As previously noted, HCI’s collective experience and expertise in most aspects of traffic and transportation engineering allows our staff to provide recommendations to our client cities on numerous traffic issues. Consequently, if a unique situation arises or a new duty is assigned by the City’s principal contact, HCI staff will not hesitate in performing the research necessary to determine an appropriate action or recommendation.

If other services are requested on a project-by-project basis, HCI will negotiate with the City and provide a pre-agreed scope of work and hours required to complete the work.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 17 ends

REFERENCES:

Below we are providing a listing of nine (9) relevant City references where HCI continues our oncall traffic engineering and signal design services, for the City of Gardena’s review & verification of our experience. All services are considered on-call/on-going traffic engineering services with assigned projects completed as requested and on schedule.

1. City of Bellflower - City Engineer & City Traffic Engineer Contract Services, (since 2000) Mr. Len Gorecki, Assist. City Manager/Public Works Director, [email protected] (562) 804-1424; Project Manager and Principal in Charge of Services – Mr. Gerald J. Stock, PE, TE

2. City of Cypress - City Traffic Engineering & Signal Operations Services, (since 1994) Mr. Nick Mangkalakiri, P.E., City Engineer, [email protected], (714) 229-6750; Principal in Charge of Traffic Signals – Mr. Greg Cabey

3. City of Hermosa Beach - On-Call City Traffic Engineer Contract Services, (since 2006) Mr. Lucho Rodriguez, Acting Director of Public Works, [email protected], (310) 318-0210; Contract City Traffic Engineer – Mr. Scott Ma, PE, TE

4. City of Indian Wells – On-Call City Traffic Engineering & Signal Operations Services, (since 2015) Mr. Ken Seumalo, P.E., Public Works Director, [email protected]; (760) 776-0237; Project Manager and Principal in Charge of Signals – Mr. Greg Cabey

5. City of Laguna Hills - City Traffic Engineering & Signal Operations Services (since 2000) Mr. Joe Ames, PE, TE, Public Works Director/City Engineer, [email protected]; (949) 707-2655; On-Call Traffic Engineering Services
Project Manager and Principal in Charge of TE Services – Mr. Gerald J. Stock, PE, TE On-Call Traffic Signal Operations Support Services
Principal in Charge of Signals – Mr. Greg Cabey

6. City of Lake Forest – City Traffic Engineer Services, (since 2014) Mr. Thomas E. Wheeler, P.E., Director of Public Works, [email protected]; (949) 461-3480; On-call Professional Engineering Services
Project Manager in Charge of Traffic Engineering Services – Mr. Scott Ma, PE, TE

7. City of San Juan Capistrano - On-Call Traffic Signal Operations Services, (since 1995) Mr. George Alvarez, Project Manager, [email protected], (949) 443-6351; Principal in Charge of Traffic Signals – Mr. Greg Cabey

8. City of Tustin - City Traffic Engineering & Signal Operations Services, (since 1993) Mr. Ken Nishikawa, Deputy Director of Public Works, [email protected]; (714) 573-3263; On-call Professional Engineering Services
Project Manager in Charge of Traffic Engineering Services – Mr. Doug Anderson Traffic Signal Operations Support Services / Signal Monitoring Project Manager and Principal in Charge of Traffic Signals – Mr. Greg Cabey On-Call Traffic Signal, Signing & Striping, & Traffic Control Plan-Checking Services Project Manager in Charge of Plan-Checking Services – Mr. Scott Ma, PE, TE

9. City of Yorba Linda - On-Call City Traffic Engineering Services, (since 1994) Mr. Tony Wang, Traffic Engineering Manager, [email protected]; (714) 961-7170; Project Manager and Principal in Charge of Traffic Signals – Mr. Greg Cabey Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Qualifications to Provide On-Call Professional Engineering Services for City of Gardena, CA

Page 18 ends

FEE SCHEDULE:

HCI is proposing to use our Schedule of Hourly Rates (attached in the appendix) for all our proposed staff positions that may be performing various on-call professional traffic engineering consulting services for the City of Gardena on a time-and-materials (T&M) basis under a new agreement, on an as-needed basis.

Our Schedule of Hourly Rates will be fixed for the duration of the initial 3-year term. If the City desires to extend the term for one or two years, HCI respectfully requests adjustments to the hourly rates at that time.

As mentioned, for most requested services, HCI proposes to serve the City of Gardena as a sole prime consultant on specific projects and does not intend on using any sub-contractors, with exception to obtaining City-requested traffic count data and possible design potholing to make sure utilities are clear for new, larger traffic signal pole foundations.

HCI also understands that future proposals for individual specific projects may be requested by the City of Gardena from firms which are selected and have executed agreements for professional oncall engineering consulting services. The attached rates will be used to prepare these specific proposals.

RESUMES:

Full resumes of our proposed staff are included in the appendix.

AGREEMENT / INSURANCE / BUSINESS LICENSE:

As HCI is currently serving several local agencies with on-call traffic engineering services, HCI is very familiar with most City requirements under their Professional Services Agreement. HCI respectfully requests certain exceptions to the agreement, as shown on the one agreement page attached in the appendix.

HCI will provide updated insurance and business license requirements at the time of execution of a new agreement for a three-year contract. HCI also understands that the execution of an On-call Professional Engineering services contract does not guarantee the City of Gardena will award work to the selected consultant(s).

Lastly, it is important to note, HCI has had no failures or refusals in completing a contract, and as no other financial interests in other lines of business.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 HCI

SCHEDULE OF HOURLY RATES
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Hartzog & Crabill, Inc.

Consulting Engineers
17821 E. 17th Street, Suite 245,  Tustin, CA 92780  (714) 731-9455 Schedule of Hourly Rates
for
City of Gardena - On-Call Professional Engineering Services September 1, 2024 – August 30, 2027
Classification Hourly Rates
Expert Witness / Deposition....................................................................................... $300 Litigation Consultation............................................................................................... $270 Two-Person Survey Crew........................................................................................... $270 Litigation Field Evaluation......................................................................................... $245 Principal Consultant.................................................................................................... $190 Project Manager.......................................................................................................... $180 Registered Land Surveyor........................................................................................... $175 Senior Engineer........................................................................................................... $165 Storm Water Permit Compliance Engineer................................................................. $165 Associate Engineer...................................................................................................... $160 Construction Manager................................................................................................. $150 Traffic Signal System Supervisor................................................................................ $150 Mural Artist.................................................................................................................. $150 Senior Designer............................................................................................................ $145 Traffic Signal Systems Specialist................................................................................. $140 Assistant Engineer........................................................................................................ $135 Draftsperson.................................................................................................................. $115 Technician..................................................................................................................... $ 100 Word Processor............................................................................................................. $ 85 Clerical.......................................................................................................................... $ 70 * Traffic Counts (Cost, plus 15%)............................................................................ $ * Note: Out of pocket expenses (blueprinting, reproduction, printing and delivery service) will be invoiced at Cost. These other direct costs are included in the not-to-exceed values for the aforementioned scope of services. A 15% fee for administration, coordination and handling will be added to subcontracted services. This Schedule of Hourly Rates is effective as of July 1, 2024. Rates may be adjusted after that date to compensate for increases of inflationary trends.

Mileage shall be per current IRS rate (rate can be found at the following link:
https://www.irs.gov/newsroom/irs-issues-standard-mileage-rates-for-2024-mileage-rate-increases-to-67-cents-a-mile-up-1-point5-cents-from-2023#:~:text=Beginning%20on%20Jan.%201%2C%202024,up%201.5%20cents%20from%202023.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325

RESUMES
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Gerald J. Stock, PE, TE
Executive Vice-President
RESUME
Years of Experience: 30
Education:
1989 BSCE, Civil Engineering,
University of Colorado, Denver
1978 BS, Geology,
California State University, Long Beach
Professional Registrations &
Certifications:

Registered Civil Engineer–California
No. 52822
Registered Traffic Engineer–California
No. 2049
Chi Epsilon – 1989
Professional Affiliations:

American Public Works Association
American Society of Civil Engineers
Mr. Stock is Executive Vice President with the consulting firm of Hartzog & Crabill, Inc. (HCI) in charge of city and traffic engineering services. He provides consulting to public agencies from both a technical and organizational perspective. Mr. Stock’s background includes a broad array of municipal projects from project conception through completion. He has directed city staffs in both long-term capital project planning as well as the day-to-day activities associated with managing a municipal engineering department.

Mr. Stock’s experience includes over (30) years of project management, capital improvement planning, design, and contract administration. He is well-versed in both the technical and the political challenges of municipal engineering activities.

Mr. Stock has recently completed Engineering and Traffic surveys for the Cities of San Juan Capistrano, South Gate, Indian Wells, Laguna Niguel, and San Gabriel, and in prior years in Bellflower, Hermosa Beach, Laguna Hills, Monrovia, Monterey Park, Moorpark, Villa Park, and Yucaipa. In every case, the project was completed on time and on budget.

Administration:

Since 2000, Mr. Stock has served the City of Bellflower as contract City Engineer and City Traffic Engineer. Mr. Stock also serves the City of Hermosa Beach as on-call Traffic Engineer. Prior to joining HCI, Mr.

Stock was employed by the City of Norwalk as their in-house City Engineer. Mr. Stock represents the Engineering/Public Works Department before the Public Safety and Planning Commissions, as well as the City Council for his client cities.

Mr. Stock has directed City staffs and consultants regarding the administration of client city’s Congestion Management Program, NPDES activities, grant applications and grant administration, underground utility districts, and pipeline/utility franchises.

Transportation:

Most recently, Mr. Stock oversaw the design and construction of the widening of Bellflower Boulevard, between Artesia Boulevard and the SR91 Freeway ramps, using Measure R funds via the SR-91/I-605 Freeway/I405 Freeway Technical Advisory Committee.

Mr. Stock prepared intersection widening plans in the City of Laguna Hills, as well as completed the Engineering and Traffic Surveys for Speed Limits in the Cities of Laguna Hills, Laguna Niguel, San Juan Capistrano, and Yorba Linda.

The City of Bellflower selected Mr. Stock to represent the City on the technical advisory committee (TAC) of the SR-91/I-605 Needs Assessment Major Corridor Study. As vice-chair of the TAC, Mr. Stock’s role is to ensure that the City’s interests are protected during the planning and development of major improvements along the SR-91and I-605 Freeways in Bellflower.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Scott Q. Ma, PE, TE
Senior Engineer
RESUME
Years of Experience: 20
Education:
2002 BSCE, Civil Engineering,
University of California, Berkeley
Professional Registrations &
Certifications:

Registered Civil Engineer–California
No. 70812
Registered Traffic Engineer–California
No. 2519
Professional Affiliations:

Institute of Transportation Engineers
Member, Orange County Traffic
Engineering Council (OCTEC)
Mr. Scott Ma is a Senior Engineer with the traffic engineering consulting firm of Hartzog & Crabill, Inc (HCI). Mr. Ma is a registered Civil and Traffic Engineer with the State of California, and has over (20) years of engineering experience. Mr. Ma has a wide breadth of experience in the field of traffic engineering and transportation planning.

Traffic Engineering
Mr. Ma’s responsibilities are to provide project management and design expertise for various traffic-related projects. Mr. Ma’s experience includes the preparation of Plans, Specifications and Estimates (PS&E) for numerous projects throughout Southern California. These include traffic signal plans, traffic control plans, road improvement plans, and signing and striping plans.

Mr. Ma has experience in signal operations and the development, implementation and calibration of coordination timing plans. Mr. Ma has also conducted Engineering and Traffic Surveys (E&TS), traffic signal warrant studies, multiway stop warrant studies, and traffic index (TI) calculations.

Transportation Planning
Mr. Ma has prepared numerous traffic impact studies, queuing studies, and shared parking studies for development projects. Mr. Ma has also participated and provided his traffic knowledge in the development of General Plans/Mobility Plans, Bicycle Master Plans, and Safe Route to School Plans.

Municipal Engineering
Mr. Ma is currently serving the Cities of Lake Forest and Hermosa Beach as consulting Traffic Engineer. He previously served as consulting Traffic Engineer for the City of South Gate. In his role, he has assisted city staff in the development of long-term Capital Improvement Programs (CIPs) as well as the day-to-day activities such as traffic-related requests from residents.

Mr. Ma has applied his traffic expertise to provide plan check services, process Encroachment Permits, implement permit parking programs and review private development plans.

Representative Projects List
 City of Commerce, HSIP Traffic Signal Modification Plans for Four (4) Intersection
 City of Commerce, Class II Bike Lanes Striping Plans for Eastern Avenue, Commerce Way and Harbor Street
 City of Bellflower, Traffic Signal Plans for Four (4) Intersections on Lakewood Boulevard
 City of Bellflower, Bellflower Boulevard and Cedar Avenue Traffic Signal Plan
 City of Yucaipa, Live Oak Canyon Road and Outer Highway 10 South Traffic Signal Plan
 City of Indio, 35 Arterial Highways and Local Streets for Signing and Striping Plans for Bicycle Facilities
 City of Hermosa Beach, On-Call Traffic Engineering Services, Consulting Traffic Engineer
 City of Lake Forest, On-Call Traffic Engineering Services, Consulting Traffic Engineer
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Michael A. Vallado
Associate Engineer
RESUME
Years of Experience: 22
Education:

BSCE – Civil Engineering, 1997
California State University, CA
Professional Affiliations:

City Traffic Engineers (CTE)
Member, Orange County Traffic
Engineering Council (OCTEC)
Traffic Signal Association (TSA) for
Los Angeles, Orange, Riverside, and San
Bernardino Counties
Mr. Vallado brings over (22) years of civil engineering experience specifically related to traffic engineering and signal design.

Five (5) of these years were devoted to managing the City of Glendora’s Traffic Engineering section, while the last (17) years have been with Hartzog & Crabill, Inc. (HCI).

Mr. Vallado’s responsibilities with HCI include conducting trafficengineering warrant studies, developing traffic Level-of-Service (LOS) operational analysis reports and providing recommendations, preparing specifications, and project management of final preparation of project plans, specifications and estimates (PS&E) to client cities.

Mr. Vallado has also assisted with the construction management of several traffic signal construction projects for various client cities.

PRIOR EXPERIENCE:

City of Glendora, Public Works Department, Glendora, CA 1999-2003 Civil Engineering Assistant-Traffic
 Maintained the operations of forty (40) traffic signals in the city.  Administered the entire process of the Traffic Safety Committee, including preparing the Agenda, gathering data for initial staff recommendations, notifying all affected residents, reserving Council Chambers, transcribing minutes from the meeting for City Council approval, and implementing all approved changes by issuing work orders.
 Designed and prepared plans, specifications, and estimates for new traffic signals, signal upgrades, and signing/striping projects.  Managed the duties of a Traffic Engineering Aide to assist in all aspects of the Traffic Engineering Division.
 Developed and implemented a new Preferential Parking District for residents in the vicinity of Glendora High School.
 Inspected sight-distance requests regarding traffic issues.  Oversaw the speed hump design and installation project on Ada Ave between Cullen Ave and Glenwood Ave.
 Reviewed traffic control plans for all different types of project developments.

Scienscope International, Inc., Walnut, CA 1998-1999
Product Manager
 Developed and produced specifications and owner’s manuals for all optical engineering products manufactured/sold.
 Answered technical information from company distributors and customers regarding manufactured products.
 Attended product trade shows in various cities and states to display/promote optical products and meet with clients.  Assisted with marketing/advertising of all products in company Internet website, magazines, registers and suppliers handbooks.  Translated catalog information into Spanish for customer base in Mexico and South America.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Greg Cabey
Traffic Signal Systems
Supervisor
Years of Experience: 31
Education:

Associate of Arts–Technical Electronics,
Fullerton College, California, 1981
Professional Affiliations:

Treasurer,
Traffic Signal Association (TSA)
Orange County Chapter
Member, International Municipal Signal
Association (IMSA)
Certified as a Traffic Signal Inspector and
Level III Traffic Signal Technician
RESUME
Mr. Greg Cabey brings over (31) years of traffic signal experience to the Hartzog & Crabill, Inc. (HCI) project team specializing in signal communications systems, timing development, implementation and finetuning of coordination timing.

Greg frequently assists client cities with reviewing numerous OCTA TSSP corridor projects under development by other consultants. The Imperial Highway and Los Alisos Boulevard TSSP projects are two current examples of projects where Greg is assisting our client cities with review of another consultants’ timing development as well as providing construction support.

Prior to the last (19) years working with HCI, Greg was a Signal Maintenance Lead-man for Peek Traffic for over (12) years. Greg’s extensive field experience with signal systems and all types of signal controller functions will aid in the success of any traffic signal coordination-type project.

RELEVANT EXPERIENCE:

Traffic Signal Operations Management (9 Cities, CA) On-Going – Greg provides assistance to Mr. Trammell Hartzog in regards to traffic signal timing and operations monitoring services for the Cities of Cerritos, Cypress, Indian Wells, Moorpark, Rancho Santa Margarita, San Juan Capistrano, Stanton, Tustin, and Yorba Linda. His responsibilities include daily reviewing and comparing of timing to verify if all traffic signals are in good working order. Any malfunctions logged are quickly reported to the City’s designated agency or traffic signal maintenance contractor for dispatch. Greg also analyzes historical data in order to identify traffic volumes and patterns to assist in determining if an adjustment to signal timing is necessary. Greg verifies if timing is programmed correctly in each master and controller. His on-going monitoring and maintenance services of signal timing for these city agencies combine to approximately (500) signalized intersections.

Ball Road-Taft Avenue Traffic Signal Synchronization Project (OCTA, Various Orange County Agencies) 2019. This TSSP project involved coordinating (38) intersections within Cities of Anaheim, Orange, and Caltrans.

Kraemer Avenue/Glassell Street/Grand Avenue Traffic Signal Synchronization Project (OCTA, Various Orange County Agencies) 2018. This TSSP project involved coordinating (61) intersections within Cities of Brea, Placentia, Yorba Linda, Santa Ana, and Caltrans.

Del Obispo Street Traffic Signal Synchronization Project (OCTA, Cities of San Juan Capistrano & Dana Point) 2016. This TSSP project involved coordinating (16) intersections along a 3.6 mile segment.

Paseo de Valencia Traffic Signal Synchronization Project (OCTA, Led by City of Laguna Hills) 2015. This TSSP project involved providing traffic signal coordination timing for (12) intersections along 3.3 miles.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 REQUEST CITY’S REVIEW

OF EXCEPTIONS TO SAMPLE AGREEMENT
Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Per our Insurance Provider’s recommendations,
HCI requests that the following highlighted language
be incorporated into the Indemnification section of
the City of Gardena’s agreement.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Hartzog & Crabill, Inc.

Engineering & Traffic Survey Page 4 of 16
performance of services under this Agreement. Consultant shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Consultant shall provide free access to the representatives of City or the City’s designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of three (3) years after receipt of final payment.

Upon completion of, or in the event of termination or suspension without cause of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Consultant. With respect to computer files, Consultant shall make available to the City, at the Consultant’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files.

10. INDEMNIFICATION AND HOLD HARMLESS
Indemnity for professional liability: When the law establishes a professional standard of care for Consultant’s Services, to the fullest extent permitted by law, Consultant shall indemnify, protect, defend and hold harmless City and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all losses, liabilities, damages, costs and expenses, including legal counsels’ fees and costs to the extent same are caused in whole or in part by any negligent or wrongful act, error or omission of Consultant, its officers, agents, employees or subconsultants (or any agency or individual that Consultant shall bear the legal liability thereof) in the performance of professional services under this Agreement.

Indemnity for other than professional liability: Other than in the performance of professional services and to the full extent permitted by law, Consultant shall indemnify, protect, defend and hold harmless City, and any and all of its officials, employees, and agents from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including legal counsels’ fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Consultant or by any individual or agency for which Consultant is legally liable, including but not limited to officers, agents, employees or subcontractors of Consultant.

Docusign Envelope ID: 0B3CEDEE-8961-4BD8-94C9-D5BDAD600325 Consultant Agreement with IDS Group Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH IDS GROUP
This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena, a municipal corporation (“City”) and IDS Group, a CA Corporation (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• Architecture and Landscape Architecture

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 2
services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RFQ, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 3
this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 4
be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 5

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfinsured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 6
losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 7
recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 8

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 9
publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 10
based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer
To Consultant: IDS Group
1 Peters Canyon Road, Suite 130
Irvine, CA 92606
Attn: Said Hilmy
Principal In Charge/Contract Administrator
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 11
that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 12
attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with IDS Group Page 13
IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – IDS Group
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 President
Said Hilmy
Secretary, VP
Rami Elhassan
Exhibit A
Request for Qualifications (RFQ)
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

REQUEST FOR QUALIFICATIONS (RFQ)
FOR

GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION

MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,

ARCHITECTURE AND LANDSCAPE ARCHITECTURE,

GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL

TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:

MAY 2024
Memoranda:

Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.

City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A” Gardena Standard Professional Services Agreement…………….……………… 10 Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 1 | Page

SECTION I

NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services NOTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on-call services related to our Public Works Capital Improvement Program and General Engineering. The work will be assigned on an as-needed basis for various projects in the City.

The Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.

The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/ Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217-9643 or [email protected].

BACKGROUND
The City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council-Manager form of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built-out, with a few remaining undeveloped parcels and a 9.4-acre wetland preserve, Gardena Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.

The Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.

The existing city-owned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City discharge to the LACSD interceptor at over 100 locations.

The existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).

The collection system pipes within the City primarily discharge to the Dominguez Channel.

Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.

The City has six (6) parks with community buildings, two gymnasiums, and a parkette. Additionally, the Gardena Wetland Preserve is situated next to Johnson Park. The City is currently constructing a new pool and senior center community center. Furthermore, the newly acquired Chase Bank Building on Rosecrans Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 2 | Page
Boulevard is slated to become a new Community Center, and Mas Fukai Park is in the construction document phase for improvements.

SUBMITTAL DEADLINE
Complete proposal/Statement of Qualification must be submitted no later than Thursday, June 13, 2024, at 2:00 p.m. PST. Three (3) hard copies and one complete PDF copy (on CD or memory stick) shall be address to:

City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, Assistant Public Works Director
The City currently anticipates conducting the selection process according to the following schedule, which is subject to revision. The City reserves the right to modify the schedule as needed.

May 9, 2024 RFQ Released
June 3, 2024 RFI Deadline
June 13, 2024 Proposal/SOQ Deadline
July 9, 2024 Staff Short List Selection
July 23, 2024 City Council Review/Approval
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 3 | Page

SECTION II

SCOPE OF SERVICES/SCOPE OF WORK
The City of Gardena would like the selected firms to provide professional on-call engineering, architecture, and/or landscape architecture services (including Construction Documents, PS&E, technical memoranda, research studies, plan checks, testing, etc.) for City projects to support the Public Works Department. The City intends to select between three and five (3-5) consultants for each respective service category, with the exception of only one or two consultants for Geotechnical Engineering/Geology/Material testing.

However, the actual number of consultants selected may be subject to change based on the number of responses and qualifications.

The award agreements are to provide on-call services for a period of three (3) years. The agreements may be renewed at the City’s discretion for up to two (2) additional years, subject to satisfactory performance during the initial three-year term. The initial three-year term is anticipated to commence in September 2024 and end in September 2027. The City encourages firms to submit qualifications for any or all parts of the key services listed below to be eligible for placement on the qualified on-call/as-needed list for each service category separately.

At the City’s discretion, selected firms will be assigned projects based on their qualifications in relation to the project(s) scope of work, or requested to submit a proposal, on an as-needed basis for various projects in the city. The City does not guarantee that successful firms will be provided with any projects.

MINIMUM QUALIFICATIONS
Only those consultants with verifiable experience related to the services requested in this solicitation will be considered during the evaluation process. Consultant staff assigned to execute the scope of services must have relevant experience in providing the necessary services as described in the scope. All personnel assigned to the work must possess appropriate certification or registration as required by state and local agencies.

SCOPE OF WORK
Selected firms will report to and operate under the direction of the City of Gardena Public Works staff to provide professional engineering, architecture, and/or landscape architecture services to the City. In general, the selected consultants will be expected to provide services and staffing for the following categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
Consultants may submit qualifications for one or more of the service categories requested; however, separate proposals and letter of transmittals must be submitted for each category.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 4 | Page

GENERAL CIVIL ENGINEERING DESIGN
Provide complete design services for Capital Improvement Program projects. Example services include, but not limited to:
• Plan preparation for street improvements, repair, rehabilitation, or other related street improvements.
• Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
• Preparation of hydrology and hydraulic analysis and reports. • Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. • Geotechnic engineering and material testing as needed. • Preparation of project technical provisions.
• Preparation of detailed cost estimates.
• Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. • Provide design and construction surveys.
• Provide construction assistance.
• Coordination with, and approvals from other permitting agencies and utility companies.

CONSTRUCTION MANAGEMENT AND INSPECTION
Provide complete construction management and inspection services for CIP, including park renovations, and facility construction/ modifications/ modernizations. Including, but not limited to:
• Coordinate and lead project construction meetings.
• Lead all meetings during the construction from pre-construction to final closeout. • Provide and maintain project files/documents per City template. • Provide and supervise construction observations/inspections for CIP projects such as streets, sewer, storm drain, parks and facilities.
• Provide construction inspection services in grading, street improvements, drainage, SWPPP/erosion control, paving, sewer, water, and franchise utilities. • Provide public contract administration (i.e. CCO, Daily logs/report, Weekley Statements, Notices, labor compliance/enforcement).
• Provide utility company coordination.
• Provide labor compliance/enforcement as needed.
• Assure contractor to maintain a set of as-built plans. • Schedule the final walk-through inspections and prepare a “punch-list”. • Collect and review the Certified Payrolls as needed.
• Assume contractor to obtain all necessary permits.
• Provide constructability review, quantity take-off and cost estimates as needed.

TRAFFIC ENGINEERING
Provide traffic design engineering and/or study/analysis services for signal and signing, striping, grant writing, and all related services, including but not limited to:
• Improvements associated with traffic signal design.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 5 | Page
• Preparation of signing, striping, signal modifications, detour, and traffic control design • Preparation of special traffic studies
• Conducting signal synchronization studies (before and after synchronization travel time), utilizing HCM method for LOS, as well as Los Angeles County standards.

ARCHITECTURE AND/OR LANDSCAPE ARCHITECTURE
Provide architecture and/or landscape architecture professionally services for public facilities. Including, but not limited to:
• Provide conceptual design, master plan, feasibilities study and envelope evaluations. • Renovation and/or expansion of existing public facilities. • Preparation of landscape/planting plans and irrigation. • Parking lot and hardscapes improvements.
• Playground layout and play structure design/upgrade.
• Preparation of project special provisions and technical specifications • Provide cost estimates.
• Provide constructability review and construction support.

GEOTECHNICAL ENGINEERING, GEOLOGY AND MATERIAL TESTING
Provide complete design, construction, or assistance services for City improvement projects and/or investigations. Services include, but are not limited to:
• Complete soils investigation and preparation of Geotechnical Engineering reports and studies, such as pavement design, grading requirements, retaining wall parameters, slope stability analysis, sinkhole/voids investigation and analysis, etc. • Laboratory work related to all aspects of Geotechnical Engineering. • Provide construction inspection for items such as asphalt concrete, aggregate base, and concrete placement during construction, grading excavation, and backfill. • Provide testing services such as field compaction and laboratory testing of soils, aggregates, asphalt, and concrete.

STAFF AUGMENTATION SERVICES (Firms may submit only for positions or service they provide.) Provide qualified and available personnel to provide professional staff augmentation services and/or backfill various positions and classifications within the Engineering Division on short notice. Positions include but are not limited to: Engineer(s), Permit Technician(s), and Inspector(s) and perform duties as an “Acting” City representative. Positions may require personnel reporting to City offices.

Immediately the City plans to augment one (1) Associate, Civil, or Senior Civil Engineer based on the qualification and best fit for the City. Other categories of augmentation services are not currently needed, however will be requested as needed.

Sample duties include, but not limited to:
• Engineer(s) general requirements (Identify an Engineer with resume and proposed classification; Associate, Civil, or Senior Civil Engineer) - Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 6 | Page
o Able to work minimum 20 hours per week or more. The City is open to accepting fulltime services as well. o Perform mathematical computations and estimates.
o Simultaneously handle several tasks and continue to reestablish priorities. o Communicate clearly and concisely with others, orally and in writing. o Ability to establish and maintain effective team relationships with all internal and external customers.
o Able to operate Microsoft Office and AutoCAD.
o Able to perform in indoor and outdoor environments with exposure to the elements. o May be required to pass a security/background check and a drug test prior before providing any services to the City.
o Must maintain a valid California Drive License.
o You may be required to work more than 40 hours a week and/or work irregular hours, particularly during emergency situations.
o Typical working hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. or 9/80 schedule from 7:30 a.m. to 5:30 p.m.
o Civil and Senior Engineer positions require a California Professional Civil Engineering license.
o May be required to arrange for the City to interview a candidate, at the Consultant’s expense, for a period of up to one (1) hour.

Typical Responsibilities – The staff will be under general direction of Engineering Division Manager, performing and overseeing various CIP projects from preliminary design to final construction. Examples of duties and responsibilities are as follow:
o Prepares RFP/RFQ for design and Construction Management and Inspection (CMI) services.
o Prepares and/or oversees design Plans, Specifications, & Estimates (PS&E). o Prepares and leads project bid processing, writes council agenda report, and executes contract.
o Oversees CMI services.
o Prepares Caltrans required submittals and coordinates review process (i.e. PES, E76 o and Contract award packages).
o Performs minor drafting, computing, and checking field operations as related to the layout and construction of pavement, curbs, gutters, sidewalk, traffic, utilities and other CIP.
o Performs LA Metro required project reporting, reimbursement process, etc. o Interprets and applies GREENBOOK, Caltrans Standards, City Standards, and other laws and regulations relating to CIP projects.
• Provide Permit Technicians to assist public at Engineering public counter (Not required to identify personnel at this time).
• Provide Construction Inspection services (Not required to identify personnel at this time), such as:
o CIP projects such as street rehabilitation; sewer or storm drain improvements, facility modifications and improvements; park rehabilitation and improvements. o Private development including paving, utilities, sewer, storm drains, paving, etc. o Repairs and improvements by private utility companies.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 7 | Page

SECTION III

SUBMITTAL REQUIREMENTS
The Proposal package shall be organized and presented in a neat and logical format relevant to the services requested. Submittals shall be clear, accurate, concise, and comprehensive. There is no page limitation, however, excessive, or irrelevant material will not be favorably received.

The Proposal should be in the order below and include the following:
• Cover
• Cover Letter
o Clearly indicate the on-call service category.
o Express why Consultant is interested in the RFQ.
o Include contact information for the person responsible for the Proposal and who will be the point of contract for the City.
o Include any unique attributes or distinguishing characteristics which would be of value to the City.
o State if any addendums have been received and include in the Proposal. o Statement regarding acceptance of Agreement and insurance requirements. o Letter shall be signed by an officer of the firm who is authorized to bind the firm to the contract. Include a statement to this effect.
• Firm Qualifications and Experience
o Describe firm’s background and experience.
o Describe your firm’s strengths.
o State how your firm produces deliverables free of errors and how you will address erros if they occur.
o Include experience and technical competence of subconsultants. o Familiarity of regional grants/competitive funds (SBCCOG & LA Metro) • Key Personnel and Experience
o Experience and history performing directly for local agencies within the last five years. o Include subconsultants if any.
• Organization Chart
• Similar Projects/Services
o Brief description of the project scope, personnel involved and their roles, plus agency and contact information of agency Project Manager/Engineer. o Projects that the firm was the prime consultant and responsible for management of any subconsultants.
• References
o Current contact information related to projects completed within the last five years. • Fee Schedule
• Resumes
Note: All licensed professionals in 'responsible charge' working on City projects (Engineers, Architects, Landscape Architects, and/or Surveyors) are required to disclose all disciplinary actions against them, including any future actions. Please provide a copy of any disciplinary actions with the proposal submission. Additionally, provide a statement if there are no disciplinary actions.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 8 | Page

SECTION IV

FEE SCHEDULE
A fee schedule should be included in the Proposal. This schedule should comprise a comprehensive list of positions and labor rates for all services provided by the prime consultant and all subconsultants. Rates should cover all necessary resources, including labor, equipment, materials, incidental reports, transportation, etc. Any percentage markup of subconsultant invoices shall be specified.

The fee schedule should remain fixed throughout the initial term of the Agreement unless formally amended by the City Council. Adjustment of the fee schedule can be negotiated if the City renews the Agreement.

The City is subject to prevailing wage laws, which apply to professional service providers and their subconsultants for whom the Department of Industrial Relations has established a wage determination.

This includes, but is not limited to, Field Soils Materials Testers, Operating Engineers, Surveyors, and Building/Construction and Specialty Inspectors.

Prevailing wage requirements apply when a Consultant and/or Consultant Team is awarded a contract for a specific project, which is designated by the issuance of a City Purchase Order.

SECTION V

SELECTION/EVALUATION CRITERIA
The Proposals will be evaluated by City of Gardena Public Works Department staff. The evaluation criteria will include:
• Presentation, completeness, clarity, organization, and conformance to the RFQ content. • Project Manager’s experience related to the City’s requirements and needs. • Familiarity/Experience related to the South Bay Cities Council of Governments (SBCCOG), Los Angeles County Metropolitan Transportation Authority (Metro), and Caltrans project programs, funding opportunities, grant writing, and their requirements. • Qualifications and resumes of staff members, subconsultants, and organization chart. • Similarity of the firm’s referenced projects completed within the last five years to the City’s expected projects.
• Availability and depth of staff and resources to deliver quality products on schedule, including work on short notice and under time constraints.
• References.
• Fee schedule.

During the evaluation period, the City may conduct negotiations with the most qualified consultants.

However, consultants should note that an award may be made without negotiations or discussions.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 9 | Page

SECTION VI

GENERAL CONDITIONS
By submitting a Proposal, the Consultant represents that they have thoroughly examined and become familiar with the requirements of this RFQ and are capable of performing quality work to achieve the objectives of the City.

The City reserves the right to withdraw the RFQ at any time without prior notice. The City makes no representations that any Agreement will be awarded to any Consultant responding to this RFQ. The City reserves the right to extend the deadline for Proposals, postpone reviewing the Proposals for its own convenience, reject any and all Proposals without indicating any reasons for such rejections, and negotiate with any qualified consultant. The City does not guarantee that successful firms will be provided with any projects.

The successful consultant(s) and sub-consultants are required to obtain and maintain a City of Gardena business license and insurance. The license and insurance shall be maintained for the duration of the Agreement. A current business license is not a prerequisite for submittal of the qualifications.

The City is not liable for any costs incurred by the Proposers before entering into a formal agreement.

Costs for developing the Proposal or any other such expenses incurred by the Proposer in responding to this RFQ and entirely the responsibility of the Proposer and shall not be reimbursed by the City.

The City is not responsible for Proposals which are delinquent, lost, incorrectly marked, sent to the wrong address, or sent by mail or courier service and not signed for by the City.

SECTION VII

AGREEMENT AND INSURANCE
The City’s standard Professional Services Agreement is included in Appendix A. The Consultant will be expected to enter into the Agreement without substantive changes. Any changes will require approval by the City Attorney. If there are any exceptions or if there are no exceptions, a statement to the effect shall be included in the proposal as well.

The City’s standard insurance requirements are included as part of the standard Professional Services Agreement included in Appendix A. The consultant shall procure and maintain throughout the duration of this Agreement.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 10 | Page

SECTION VIII
APPENDIX “A”
Gardena Standard Professional Services Agreement
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH XYZ
This Agreement is entered into this day of , 2024,
by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 3

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee proposal hereto and incorporated herein by reference. In no event shall compensation under this Agreement exceed _____________and 00/00 ($###.##) without the prior written authorization of the City Council.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 4
extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 5
shall be issued by an insurance company which is admitted to do business in the State of California.

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfDocusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 7
the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 8
paid by City for employer contribution and/or employee contributions for PERS benefits.

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 9
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 10
Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works
To Consultant: XYZ
Address
XXXX, CA #####
Attn: Name
Tittle
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 11
own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 12

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with XYZ Page 13
other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – XYZ
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 2024 City of Gardena RFQ On-Call Professional Services
JUNE 4, 2024

RFQ FOR ON-CALL PROFESSIONAL SERVICES
ADDENDUM 01
TO: ALL RFQ HOLDERS
ADDENDUM NO. 1, AS DESCRIBED BELOW, IS FOR THE USE OF CONSULTANTS SUBMITTING THE STATEMENT OF QUALIFICATIONS OR RESPONSES TO THE CITY’S REQUEST FOR QUALIFICATIONS. ALL

CONSULTANTS SHALL INDICATE ON THE STATEMENT/PROPOSAL COVER LETTER THAT THEY HAVE RECEIVED THIS ADDENDUM NO. 1.

QUESTIONS & RESPONSES:

1. In regard to the subject RFQ Scope of Work for General Civil Engineering Design as shown on page 4, can you please confirm if the City would like us to include Geotechnical services as part of the Civil component as stated, since there is also a separate RFQ category for Geotechnical service on page 5? No, please submit a separate statement of qualifications if your firm is interested in providing services in the category of Geotechnical Engineering, Geology, and Material Testing. This category is intended for direct geotechnical services for the City. For General Civil Engineering Design, it is expected that the lead consultant will team up with your desired geotechnical consultant or your own qualified staff as needed to provide complete PS&E construction documents.

2. Can firms be both a prime consultant and a sub-consultant to another team in the same or different service category?
Yes, firms can be both.

3. Will the City allow the usage of the City’s logo in the proposal materials? Yes, the City will allow the usage of the logo.

4. Can you specify how “Associate, Civil, and Senior Civil” Engineers are classified? Is it based on number of years of experience or other criteria?
You may reference the City of Gardena’s job specifications as your minimum guideline:
https://www.governmentjobs.com/careers/cityofgardena/classspecs. The specifications for the Senior Civil Engineer position have not been developed. Therefore, assume that the job responsibilities are similar to those of a Civil Engineer, but require a minimum of 8 years of experience, including managerial experience. As mentioned, these specifications are minimal guidelines and consultants are encouraged to propose additional qualifications or experience to provide a competitive proposal.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 2024 City of Gardena RFQ On-Call Professional Services

5. Can you please confirm if firms are able to just submit a proposal for the geotechnical engineering/geology and material testing services or require having a team with a construction management company in order to pursue this?
Yes, you may just submit a proposal/statement for the geotechnical/geology and material services.

6. Do you anticipate consultants to support and prepare grant applications? The City may request services under General Civil Engineering, Traffic Engineering, Architecture and/or Landscape Architecture as applicable.

7. You are requesting references in the Similar Projects/Services and the References sections. Can you please clarify what information you would like in each section since both sections are asking for client contact information?
The information can overlap; however, Similar Projects/Services should identify specific projects with scope descriptions, key personnel and their roles, project dates, etc., as mentioned in the RFQ. The Reference Section should identify the current contact agency, person, phone number, and email so the reviewer can perform the reference check if necessary.

END OF ADDENDUM 01
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Exhibit B
Statement of Qualifications (SOQ)
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 City of Gardena
Public Works Depar tment
ON-CALL PROFESSIONAL SERVICES Architecture & Landscape Architecture Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

CITY OF GARDENA
PUBLIC WORKS DEPARTMENT 1 STATEMENT OF QUALIFICATIONSArchitecture & Landscape Architecture Table of Contents
1 Cover Letter
2 Firm Qualifications & Experience
3 Key Personnel & Experience
13 Organization Chart
16 Similar Projects/Services
17 References
29 Fee Schedule
30 Resumes
31 Solutions Through Integrated Design

TABLE OF CONTENTS
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 1 Peters Canyon Road, Suite 130, Irvine California 92606 949.387.8500 949.387.0800 www.idsgi.com June 13, 2024
City of Gardena Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
SUBJECT: Request for Qualifications for On-Call Professional Services - Architecture & Landscape Architecture Attention: Kevin Kwak, Assistant Public Works Director
Dear Members of the Selection Committee,
IDS Group, Inc. (IDS) is pleased to present our qualifications to the City of Gardena for On-Call Professional Services for Architecture and Landscape Architecture. As a fully integrated architectural/engineering multidisciplinary firm, IDS has significant and proven experience in providing A/E design services for complex design renovations, additions, and modernizations as well as new construction for various facilities and project types. IDS brings a proven track record interfacing with project stakeholders and code compliance for public agency projects.

IDS’ Value to the City of Gardena:
• We have roots spanning six decades covering a wide range of renovation, expansion, and new projects that are aligned with the City of Gardena.
• Our in-house A/E project team brings recently completed work experience for upgrades to existing essential facilities, working along with public agency stakeholders on rehabilitation and development projects that include but not limited to assessments, pre-design, architectural and engineering design services, and cost estimates.

IDS has reviewed the Agreement and Insurance and agree to terms and conditions. IDS also acknowledges the receipt of Addenda No. 1 released on June 4, 2024.

Mr. John Silber, AIA, Principal Architect of IDS Group, will be the main point-of-contact for the City. Any questions pertaining to our submittal can be directed to John at 949.387.8500 Ext. 154 or via email [email protected]. Mr.

Said Hilmy, PhD, PE, SE, LEED AP, Principal of IDS Group, hereby acknowledges that he will be the contract administrator for this submittal and will negotiate and contractually bind the firm regarding matters pertaining to this submittal.

IDS looks forward to continuing its relationship with the City of Gardena with its quality technical expertise and design solutions.

Sincerely,
IDS Group
John Silber, AIA Said Hilmy, PhD, PE, SE, LEED AP
Principal Architect/Project Manager Principal In Charge/Contract Administrator Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

CITY OF GARDENA
PUBLIC WORKS DEPARTMENT 3 STATEMENT OF QUALIFICATIONSArchitecture & Landscape Architecture

FIRM BACKGROUND
IDS Group, Inc. (IDS) is a multidisciplinary design firm with roots spanning over 60 years. Our longevity comes from integrating all specialized divisions under one roof giving our clients a premium customer experience by creating a “one-stop-shop” of design professionals. Not only does “IDS” stands for Integrated Design Services, our 90-plus staff brings a mixture of innate curiosity, technical expertise, building and infrastructure experience to all projects, applying these skills to each project’s unique circumstances, and creating project success.

IDS has offices in Irvine, Los Angeles, Corona and Encinitas, California, ensuring local knowledge and providing our clients with quick response times. As a multidisciplinary architectural and engineering firm, IDS has the practical knowledge, insight, and resources to offer our clients comprehensive services and specialized solutions.

Our corporate infrastructure creates optimum utilization of resources for our staff, maximizing service efficiency. IDS is committed to project excellence, providing turnkey design solutions to the building and infrastructure industries. As an award-wining professional architectural/engineering consulting firm specializing in the design and renovation, evaluation and assessment, and construction administration for a wide range of clients and facilities.

Business Information
Company
Ownership IDS is a California Corporation
Contact
Person Said Hilmy, PhD, PE, SE, LEED AP
Principal / Contract Administrator
949.387.8500 x 116 | [email protected]
John Silber, AIA
Principal Architect
949.387.8500 X154 | [email protected]
Offices (Corporate Office)
1 Peters Canyon Road, Suite 130
Irvine, California 92606
T: 949.387.8500
(Additional Offices)
Los Angeles Office:
11845 West Olympic Boulevard, Suite 715 E
Los Angeles, California 90061
T: 323.800.6500
Encinitas Office:
336 Encinitas Blvd., Suite 110
Encinitas, CA 92024
T: 619.768.6784
Corona Office:
980 Montecito, Suite 205
Corona, CA 92879
T: 619.768.6784
Number of
Employees 90

FIRM QUALIFICATIONS &

EXPEREINCE
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 4 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Throughout our history, we have been involved in numerous renovations, assessments, additions, design, and upgrades for all types of projects throughout Southern California.

Our services include the following:
• Architectural
• Landscape Architecture
• Structural Engineering
• Mechanical, Electrical & Plumbing Engineering
• Civil Engineering
• Cost Estimating
• Access Compliance (ADA)
• LEED Planning/Certification
• Energy Assessment
• Building Evaluations and Modifications
• Forensic Investigation
• Risk Assessment and Reduction
• Constructability and Design Review
Our project history demonstrates thoroughness and accuracy in our investigation and production of construction documents in accordance with established state procedures and guidelines, as well as having an efficient response time without diminishing the accuracy of the work.

ARCHITECTURAL SERVICES
One clear benefit that IDS offers our clients is our in-house interdisciplinary diversified staff that delivers the expertise of seasoned architects and engineers.

IDS seamlessly integrates architectural design services with in-house design professionals who specialize in landscape architecture, structural, civil, mechanical, electrical, and plumbing engineering, as well as cost estimating to provide a wellrounded balance of design capabilities for our clients as a value-added service.

Our award-winning Architectural provides architecture, design, planning, programming, project management and renovation services to public and private clients throughout California. Our architectural services involve building assessments, alterations, and modifications, accessibility studies, ADA compliance studies and design, fire and life safety assessment and design, code review, space planning, remodeling, repair of damaged and deteriorated structures, and expansions and additions to existing facilities. The project experience of IDS staff encompasses new construction, renovation, re-adaptation, and tenant improvements to a variety of building types.

With staff of over twenty Architects, our award-winning architecture division provides architecture, design, planning, programming, project management and renovation services to public and private clients throughout California.

We have a specialized experience managing small and medium-scale projects, with particular proficiency in:
• Interacting with project
stakeholders
• Conducting facility needs
assessments & master plans
• Providing planning phase duties
• Preparing schematic designs,
design development documents,
and construction documents
• Developing construction cost
estimates
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 5 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Our architectural team will assure the City of Gardena an approach that is industry leading, practical, responsive, and affordable. They work closely with our in-house engineering divisions to ensure the ultimate in design coordination.

From the initial project programming and preliminary design concept to completion of construction, our work reflects innovative approaches to solving even the most complex space and design problems.

LANDSCAPE ARCHITECTURE DESIGN EXPERIENCE
IDS has a dedicated Landscape Architecture team that specializes in building healthy places for communities through the practices of landscape architecture and ecological restoration. The team focuses on the relationship between land and people where we are only as healthy as our surroundings. The majority of the team’s work lies in municipalities, counties and other California agencies working closely with clients and stakeholder groups to design and build healthy communities and improve quality of life. The projects designed draw from natural and cultural histories of the land and improve the natural ecological systems. Specialized expertise includes historic preservation, adaptive re-use, cultural landscapes, cultural and natural history interpretation, ecological restoration, sustainable design, drought tolerant planting, low water irrigation systems, and context-integrated design.

ADDITIONAL IN-HOUSE CAPABILITIES
Our Structural Engineering division is a recognized leader in the design, assessment, review, and seismic retrofit of buildings and site improvements. The depth of our work includes the design of new buildings utilizing steel, concrete, and masonry, the assessment and retrofit of numerous buildings of all sizes, the evaluation, and repair of distressed structures, peer and plan review, constructability review, and forensic engineering. Our team has been honored by the Structural Engineers Association of Southern California (SEAOSC) awards for innovative and outstanding design.

Our Electrical Engineering division has extensive experience in a wide variety of projects and in the preparation of engineering studies and analyses, reviewing plans, drawings, and specifications for new construction projects for electrical code compliance, conducting electrical power consumption studies and field investigations, and providing construction cost estimates, concept studies and reports, and post-construction support for electrical engineering projects.

We also have extensive electrical project experience involving electrical power consumption studies and field investigations; the review of plans, drawings, and specifications of new construction projects for electrical code compliance and delivering post-construction support; construction cost estimates for electrical wiring infrastructures; and drafting concept studies and reports.

El Paso & Southwestern Railroad Greenway
County of Orange, Brea Library Renovation
City of Irvine, Great Parks Concessions
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 6 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Our Mechanical/Plumbing Engineering division is comprised of professional engineers and designers who are experts in the fields of heating, ventilating, air conditioning, plumbing, piping, and fire protection. We have provided design services for HVAC, plumbing, and fire protection systems for countless public projects and facilities including some of the largest parking structures in California. These projects encompass new construction, retrofit, modernization, and expansions of facilities.

The IDS Civil Engineering division offers a wide array of expertise and experience, specializing in providing planning and entitlement, civil engineering, surveying and mapping, construction survey, LEED, sustainable design, construction administration, and drainage and storm water pollution treatment.

Our in-house Cost Estimation Services are provided by experienced cost estimators, supporting both new construction and complex renovation projects supplying extensive knowledge for a variety of tenant improvement types. Utilizing the latest in cost control methods, IDS ensures clients’ projects are well planned and expertly executed.

In the delivery of its cost services, IDS provides reliable, accurate estimates while meeting its client’s most critical deadlines.

Sustainable Engineering
The firm’s project approach begins with a complete assessment of project requirements to achieve a LEED certification or provide a sustainable design without certification. To meet the project requirements our team will investigate all sustainability options including photovoltaic solar system, commercial and residential fuel cell systems, geothermal ground source heat pump systems, low energy LED lighting products, water conservation design solutions, day lighting harvesting, low-flow plumbing fixtures and high SEER air conditioning equipment.

Bidding and Construction Administration Support
IDS has significant experience with providing practical, cost effective, fast/efficient solutions and high-quality construction documents and drawings and significant experience in construction support and on-site construction administration services for public projects. IDS will draw from our “Lessons Learned” gained through our extensive history of involvement with civic projects. We know firsthand that our ability to adapt to the challenging daily demands of the City’s operation is essential to meeting the goals of the project. As an example, during the pandemic, IDS worked with several clients, conducting Zoom meetings, Bluebeam QA sessions, and continued communications via email and phone. Utilizing this valuable knowledge, IDS has employed new measures to ensure your objectives and goals are efficiently achieved and our team adheres to milestone schedules for successful project completion.

Building Information Modeling (BIM)
Building on decades of hands-on experience in Building Information Modeling (BIM), IDS is committed to creating value for our clients through innovative and fully integrated design solutions. IDS’ BIM platform helps our multi-discipline design and construction teams improve project efficiency by optimizing performance and response-time of visualizations and simulations to create unprecedented data rich models. Our clients are experiencing the benefits of BIM that extend long past the completion of a project - including improved constructability, betterperforming buildings and more efficient project delivery as well as construction cost savings, schedule compression and energy reductions.

City of Anaheim,
Anaheim West Tower HVAC Replacement
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 7 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
We have completed numerous BIM projects ranging from large civic projects, to K-12 School projects, and private commercial buildings. This includes the design of new buildings and tenant improvements of existing spaces.

Additionally, IDS has assisted in the development of BIM standards for public and private organizations With the advances of the rendering technology, IDS maintains several state-of-the-art rendering programs to provide simulations and effective presentations.

FIRM QUALIFICATIONS
Our success is attributed to a thorough understanding of the required services, a sound work plan, communication, and effective management, as well as excellent engineering design. IDS has successfully served as a professional consultant to numerous public agencies to help meet workload demands and project scheduling commitments in relation to engineering consulting support services.

Our team will support the City in fulfilling its critical mission to meet existing and future demands for various projects.

Our general approach to providing our standard services for each project begins with a solid understanding of the project requirements, including budget, schedule, details of scope of services, and deliverable items. Our work plan is based on effective management of resources which will include developing a project schedule, implementing effective communication protocol, monitoring project costs and budget, and implementing quality control measures to ensure quality documents. Our approach to each project is to act as the City’s architectural and engineering design consultant for all design and approval‐related activities.

Schematic Design
• Field Review/Code Compliance: Research project scope thorough field review and interviews with key stakeholders. The findings of the field review and interviews will be compared to the relevant materials furnished by the city and to applicable codes including current ADA codes. • Schematic Design: Develop schematic designs and associated cost estimates for the project. The schematic designs will form the basis of initial presentation and review. The schematic designs will also be utilized to develop environmental technical studies and subsequent environmental documents. • Incorporate Plans with City’s Standards: The finished plans will be prepared consistent with the City’s business standards.

Design Development
• Experienced Team: Mobilize a team of experts suited to the project scope, immediately following the approval of the conceptual design and authorization of a design contract. The team will be led by the project manager with oversight from the supervising principal.
• Kick-off Meeting: Assemble the project team with the City’s representatives for a project kick-off meeting during which the conceptual design will be reviewed, and a timeline for the design development phase and construction document phase will be established.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 8 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
• Meeting with Stakeholders: Meet with all project stakeholders and review agencies to update all project scope aspects and to establish a sequence for the project review and approval, such that all reviews proceed in a logical fashion to minimize conflicting review comments and schedule impacts. • Progress Meetings: Maintain a regular schedule of progress meetings throughout the design progress. A schedule of milestone progress submittals will also be established based upon the scope and the most logical sequence to fast-track the design process.
• Milestone Review: Hold milestone reviews. All milestones will conform to the approved schedule and will conclude with a team meeting to solidify the direction of the design. • Coordination: Coordinate with all internal review staff and document and track comments for incorporation into the final design. Any deviations from the original scope documents or deviations from design standards will be immediately reported and confirmed with the design team. Throughout the design development phase, we will aggressively coordinate with all agencies having jurisdiction. • Documents delivered at 90% Progress Set: At the 90% of Design Development progress, we meet with the City to review the 90% progress set of design development documents. We will implement any changes required.
• Critical Path Schedule: We will assist in the coordination of a Critical Path Schedule for construction. • Completion of Design Development: At 100% of Design Development, we will deliver the Design Development progress set as hard copies, AutoCAD, and PDF file format.

Construction Documents
• CD Development: Proceed with preparation of construction documents upon authorization from the City after completion of design development.
• Construction Documents: Delivered documents will be as set forth in the scope of work and will include required building permit review/responses and permit ready documents. • Preconstruction Review: Execute a comprehensive pre-construction review of the project to avoid any conflicting design issues, or specification misinterpretations or plan ambiguities. The extensive construction experience of the IDS staff will be particularly beneficial in this respect. • Cost Estimate: Issue a final construction cost estimate and schedule along with the completed construction documents including specifications.

Bidding Assistance
• Bid Review: Assist in bid review and award, following bid advertisement and acceptance. • Pre-Bid Meeting: We will attend the pre-bid meeting.
• RFI Response: Promptly respond to all Requests for Information during the bidding process and assist in Issuing Amendments if needed.

Construction Observation | Administration
• Submittals: Diligently document all responses and record observations from all field visits. • Contractor’s Pay Request: Assist in the evaluation of contractor pay requests and extra work authorizations if required.
• Inspection: Complete timely site inspections and attend site meetings. • Close-out: Assist with project punch lists and project close-out.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 9 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture

PROVIDING DELIVERABLES FREE OF ERRORS
Specific to the City, our team will review projects at every stage of submittal for quality assurance. We have designated QA/QC senior architects and engineers who along with our designated Project Manager will review documents before they are submitted to the City.

Our program requires all engineering work be reviewed by an experienced Quality Assurance/Quality Control (QA/QC) Manager(s). The main objective of this program is to satisfy the City’s expectations for quality work from our design team and to limit the exposure of the City to problems that may arise during construction. The QA/QC Manager(s) will be in continuous contact with our Project Manager throughout the progress of the project.

Our practice stresses response to project requirements, adherence to applicable codes and regulations, developing work products consistent with standards prevailing in the profession, and producing reports conforming to our established in‐house standards. Throughout the course of the project, our Project Manager will be in continuous contact with our team members to ensure efficient use of the capabilities of the entire team. He will interact frequently with the City’s core group to ensure that we understand the requirements and preferences and to assure adherence to the project schedules and deliverables in a timely manner.

As a testimony to our audited Q/A Q/C procedures, IDS Group accomplished ISO 9001 Certification.

IDS QA/QC program manual based on ISO 9001 standard as applicable to A/E services:

1. Define the scope of work.

2. Determine processes to achieve the deliverables.

3. Perform the work

4. Check (QC) the work.

5. Confirm the work is updated per checker(s).

6. Document the process.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 10 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture

PROJECT MANAGEMENT &

PROJECT CONTROLS
IDS’ project manager will implement project controls
including timely and regular client communications,
established monitoring to control costs and schedule.

Activities under the umbrella of project controls
include:

Project Planning: IDS’ Project Manager will create
project plans, schedules, WBS, and budget to establish
a baseline to work with throughout the project. This
includes a kick-off meeting to deeply understand all of our client’s needs.

Budgeting: IDS’ team will provide schedule-phased
budgets, a transparent model that will be available to
serve as a benchmark throughout the project and as
an important cash flow tool for accurate invoicing and
project accounting.

Risk Management: Our team will preemptively identify risks, monitor risk continuously, and develop a contingency plan to address and mitigate issues to help reduce impacts to budget and schedule.

Forecasting: IDS’ team will perform regular updates to the schedule to ensure faster responses and corrective actions if a project schedule moves off-track.

Project Administration: This process involves established processes and systems that can help team members communicate and collaborate. The goal is to track status, action items, capture meeting minutes and lessons learned, and manage workflows seamlessly so teams can focus on efficient execution of project tasks.

Constructability Reviews
To improve project efficiency and constructability, IDS’ team leverages Bluebeam Revu®, a PDF-based solution designed for the construction industry, for each phase of the preconstruction process. Revu enables IDS to electronically share project feedback by redlining PDFs with industry-standard markups and takeoffs. In addition, IDS utilizes an online session collaboration feature, which allows multiple discipline-lead reviewers to comment on the same PDF together in real-time, or individually. As a result of this concurrent review, where team members can see comments made by other members, a more comprehensive, easy to understand, and quality list of comments are generated resulting in improved deliverables.

Work Schedule Management
The key to successfully implementing a project schedule is to: first, develop a realistic schedule with sufficient detail to define the critical‐path tasks required; second, implement a timely decision‐making process that continually moves the project forward in a proactive manner; and finally, to tenaciously adhere to that schedule with a continual sense of urgency. Equally important is to allow sufficient time for the Client’s involvement and evaluation of all design issues. The team prides itself on both our ability to build realistic, achievable schedules and to guide the design team, including the owner, through the decision‐making process that meets those critical timelines.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 11 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Bringing a Project Back on Schedule
We keep projects on track through constant team communication and anticipating possible delays in the schedule.

Before initiating a major project, the IDS Team will hold a special meeting to discuss work tasking and schedule constraints for each element of the project. Minutes from these meetings will be circulated to all Project Team members for their review and concurrence. Schedules will be distributed to all parties via email. Most importantly, the schedule is more than simply a reporting tool. It is an “early warning device” to anticipate possible delays and proactively manage activities. Our “percent complete” schedule will realistically measure work order progress. With such advance notice, each team leader can respond quickly to avoid task slowdowns and maintain the schedule. IDS typically holds Project Team meetings, which are scheduled bi‐monthly or weekly (as deemed necessary) to keep a project on “target” and “on track.”
Potential Problem
Method of Identification
Discussion Possible Corrective Action
with Agency
Communicate
to Project
Manager by
Staff
Team
Meetings
Progress
Review by
Project
Manager
Change in Requirements Expand Staff; accelerate schedule. Hold team meeting; revise staffing; revise
schedule and budget if necessary.
- Accelerated Delivery 
- Modification of Scope 
Slippage in Schedule    Expand staffing; revise schedule in consultation with Agency.

Attrition of Personnel    Execute backup plan for key staff; utilize existing resource pool.

Cost Growth    Absorb cost growth if no change in scope of work.

Quality of Work    
Immediate meeting of project Manager
and appropriate staff; possible staff
changes.

Subcontractor
Performance
  
Immediate discussions between Project
Manager and Subcontractor; implement
specific corrective action plan.

Delay in Review Process
at the Agency

Hold in-person review to expedite review
schedule; accelerate the response to
comment schedule.

The Project Manager will present persistent problems to senior management at IDS for assistance in problem resolution to assure that contract performance meets all Agency expectations and standards. The table below summarizes potential problem areas and the management methods IDS’ uses to identify and resolve them at the earliest possible time.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 12 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Construction Observation | Administration
Scheduling is a critical component of the design and construction process. A project schedule for each assignment will be developed using the critical‐path‐method in Microsoft Project and / or Excel. The project schedule will be developed at the start of the project and will include all the phases and milestones that are identified by the City and / or mandated by project requirements. The design schedule will include meetings with the City project manager and its consultants at various milestones and provide status / progress reports. We will update the schedule and work plan regularly based on the actual hours worked that are tracked by our internal accounting system. In this way, we can adjust resources to ensure that the project milestones are completed on schedule. We also have an excellent record working on fast‐track projects. In these projects, it is essential for the design team to meet the critical path milestones that precede project completion.

Cost Estimates/ Cost Control
Our standard software, PlanSwift, provides the flexibility to quickly break out the itemized takeoff. This efficiency reduces the number of resources required to complete the takeoff for each project, and the program’s area and zone functions allow the estimator to sort the takeoff into multiple breakouts with minimal effort.

As design progresses, the more detailed documents can be virtually overlaid over previous ones, and changes/additions are immediately visible on screen. This ensures that our estimates at logical milestones during design (SD, DD, CD, etc.), can execute the later levels of design faster and more accurately.

When tasked with value engineering on the same project, our team members will go back and modify the original takeoffs to determine the less expensive methods or materials to construct the project. The benefit with PlanSwift is it allows the estimator to select the existing items and easily assign them to new or other existing conditions with the click of a button.

Value Engineering, Life Cycle Cost Analysis, and Bid Alternate Designation IDS performs in-house cost estimates to identify opportunities for alternate bids that will provide flexibility for our clients as they balance the project scope for construction and the cost of construction.

The first path to value engineering savings is constructability. Our construction cost estimator provides an internal constructability review, which will allow the design team to eliminate scope that will later prove to be impractical to build and therefore costly.

The second path to value engineering is the search for alternates that provide nearly equal performance at less initial cost. When considering these initial cost savings, IDS provides a life cycle cost analysis of the alternatives so that our clients can make informed choices.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

CITY OF GARDENA
PUBLIC WORKS DEPARTMENT 13 STATEMENT OF QUALIFICATIONSArchitecture & Landscape Architecture

EXPERIENCE & HISTORY
IDS works with numerous large and small public agencies and private clients who continuously seek our assistance in architectural and engineering consulting services. We have been in operation providing architectural and engineering services for over 25 years, and we have worked on projects ranging upward to $8,000,000 in a single project fee and $1 billion in a single project construction cost (e.g. LAX expansion projects). We have also worked on small projects with fees as low as $5,000. For us, what is most important is the added value that we provide our clients, not the size of the project. Accordingly, a large portion of our work is from repeated clients, familiar with our combined staff and services.

The IDS team understands the issues impacting local government and we are well-versed in the nuances of traditional public and alternative capital delivery methods. Additionally, our experts understand that the future prosperity of municipalities and their constituencies will be shaped, in part, by leadership’s ability to demonstrate that high quality service can be provided in a cost-effective manner.

Our clients’ partner with IDS because of our focus on procurement, implementation and programming choices that capture the full potential of projects to stakeholders. The IDS team has experience representing and advising public agencies and supporting private bid teams on complex social infrastructure developments. With IDS, our clients receive the right complement of commercial, financial, and technical skills, from a group with a deep understanding of various policy implications.

Below are a partial listing and examples of projects completed under Architectural/Engineering On-Call contracts within the last five (5) years:
• City of Riverside Civil On-Call Consulting Services
• City of Laguna Beach Architectural & Structural OnCall • City of Irvine A/E and PM/CM services
• City of Huntington Beach As-Needed AE Services
• Anaheim On-Call Engineering for Convention Center
& Arena Division
• City of Santa Ana Constructability Review Services
• City of Santa Ana Public Works - Space Planning and
Architectural Services
• City of Fountain Valley As-Needed On-Call Design
Services
• City of Newport Beach On-Call
• Orange County Fire Authority Blanket Contract

KEY PERSONNEL & EXPERIENCE
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 14 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
• County of Orange PW On-Call A/E Services
• Orange County Sheriff’s Department On-Call AE
Services
• Orange County Transportation Authority A/E Design
Services
• Orange County Sanitation District As-Needed
Professional Design Services
• City of Downey As-Needed Professional
Architectural Services
• Los Angeles County Department of Parks &
Recreation As-Needed AE Services
• Los Angeles County Community Development
Commission– A/E services
• County of Riverside - Economic Development
Agency As-Needed AE Services
• San Bernardino County As-Needed Architectural &
Structural Engineering Services
• Department of General Services As Needed
Architectural Services
• Department of General Services As Needed
Forensics A/E Services Retainer for Southern Region

PROJECT MANAGEMENT
IDS is familiar with the City of Gardena’s standards and will work within those guidelines in order to ensure project success from design through completion. Our Management Plan is based upon a hierarchical team approach and is led by the Principal Architect/Project Manager, John Silber in conjunction with our Associate Principal for our Landscape Architecture team. In this management plan, our Project Manager will assemble a project team for each project assignment, matching the special capabilities of our staff and / or consultants with the requirements of the project. The Project Manager is committed to meeting staffing and schedule requirements necessary for successful project completion.

Project communication begins with establishing project responsibilities, organizational structure, and clear lines of reporting within the consulting team. Based on our experience in similar projects, we have developed a clear and efficient management procedure for our services.

The Project Manager will:
• Provide a licensed project architect/engineer with
extensive related work experience and training to
meet the project needs.
• Ensure that the team is supported with the
commitment of necessary resources of the firm(s)
to respond to the project needs for a successful
project completion, ensure that qualified
professionals with related work experience will
be assigned for design review and design services
respectively.
• Develop the project schedule and monitor the
progress of the project through standing team
meeting and monitor the review budget at various
stages. Provide progress reports and facilitate the
review of the work.
• Monitor the technical performance of the project
team, ensure quality and consistency (QC),
and ensure detection and resolution of project
performance issues before they become problems.
• Ensure that the City is clearly informed of the
progress and status of the project.
• Enhance working relationships of team members
and the City of Gardena.

Project Delivery: IDS Group is prepared and equipped to provide the requested services to the City in a timely manner and on relatively short notice so as to enable the City to meet critical deadlines and schedules.

Risk Mitigation: Two aspects of risk mitigation during the execution of On-Call services projects include mitigating change orders/ cost overrun and ensuring quality delivery.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 15 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Project Manager - Architecture
John Silber, AIA | Principal Architect / Project Manager IDS’ Principal Architect and Project Manager, John Silber, AIA, brings over three decades of community-focused projects. John is an invaluable asset to IDS and the City of Gardena because of his broad range of expertise. John has covered urban projects that integrate public education, cultural equity, and economic vitality throughout the communities he has worked with. Whether it’s providing recommendations for a feasibility study of an existing building or implementing ecological principles and sustainable design for a new community center, John is keen on understanding the context and concerns of the City of Gardena and community stakeholders. As a hands-on technical practitioner, John is involved in the onset of projects from the programming and master planning stages through design development, working drawing production, and administration of the construction contract.

Project Manager - Landscape Architecture
Joy Lyndes, PLA, FASLA | Associate Principal, Landscape Architecture Joy Lyndes, PLA, FASALA, leads the IDS Landscape Architecture Division. Joy has over 35 years of experience in landscape architecture, historic and cultural interpretation in parks, design, urban planning, sustainable design solutions, and ecology. She offers a broad portfolio of successful and award-winning historic preservation planning and design projects located throughout the US Southwest.

Joy’s unique expertise includes university facilities and campuses; local, regional, and national parks, recreation and trails design and planning; and municipal facilities (such as libraries and museums). Her focus is to meet user needs through sensitive and appropriate preservation, rehabilitation, restoration, and reconstruction, creating functional, interactive, and engaging spaces for people; that draw from the contextual fabric, add value to the community, are constructible and durable, and improve the quality of community life.

Sub-Consultants
As a multidiscipline architectural and engineering design firm, IDS seamlessly integrates all specialized divisions under one roof giving our clients a premium customer experience by creating a “one-stop-shop” of design professionals.

After reviewing the scope of services, IDS will be providing required services in-house.

IDS Team Members
The IDS staffing and resource management plan is based on our extensive experience providing A/E services for public agencies. IDS will furnish the most expeditious and efficient response time available, including all key stakeholders, to ensure collaborative success. Our flexible organizational infrastructure allows us to meet any project’s technical and schedule challenges by assigning the appropriate members with specific qualifications and experience to match the project scope, budget and schedule requirements. Close internal collaboration and coordination between all disciplines, supported by state‐of‐the‐art technology, provides quality of service and efficiency in production.

The IDS team listed on the below organization chart, have worked independently or teamed on projects with similar deliverables and have successfully collaboratively providing architectural and engineering services for numerous oncall contracts. Resumes for key individuals have been included in the resume portion of this submittal.

Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 16 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Said Hilmy, PhD, PE, SE*
Principal in Charge /
Contract Administrator
John Silber, AIA*
Principal Architect/
Project Manager

ARCHITECTURE TEAM LANDSCAPE ARCHITECTURE TEAM
Shelley Sivak, RA, LEED AP*
Project Architect
Kristen Gros, PLA, ASLA, LEED AP ND*
Deputy Project Manager
Matthew Miller, AIA, LEED AP*
Project Architect
Ruoxi (Cisy) Cao, LEED AP ND*
Landscape Architect Designer
Bradley Mansfield,AIA*
Project Architect
Mahsa Javaherian
Project Designer
Song Brandner, RA, LEED GA*
Project Architect
Eduardo Fabros
Job Captain
Quentin Montrie, LEED AP
Sr. Project Designer
Annielyn Bactol, LEED AP
Project Lead

IN HOUSE SUPPORT SERVICES

STRUCTURAL ENGINEERING
Jaime Rosenbach, PE, SE*
Senior Structural Engineer

CIVIL ENGINEERING
Adrian Anderson, PE*
Lead Civil Engineer

MECHANICAL/PLUMBING ENGINEERING
Darren Smith, PE, BEAP*
Lead Mechanical/Plumbing Engineer

ELECTRICAL ENGINEERING
Steven Collins, PE, LEED AP*
Lead Electrical Engineer

COST ESTIMATING
Faisal Dakhil*
Cost Estimator
Joy Lyndes, PLA, FASLA*
Associate Principal,
Landscape Architecture
*Key Team Members

ORGANIZATION CHART
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 17 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
The following pages highlight our experience providing architectural/engineering services for various municipalities that are similar to scope as outlined in the RFQ.

SIMILAR PROJECTS / SERVICES
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 18 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of Irvine Police Department Workspace
Relocation and Tenant Improvements
Brief Description
IDS provided architectural design services for tenant improvement for the proposed expansion and relocation of various departments in the City of Irvine Civic Center. The project primarily focused on the expansion of the existing police department (Public Safety) because of recent population growth within the city in the last few years.

The current multi-story Civic Center houses many departments within the facility, including Public Safety, Traffic Management and Public Works. To accommodate the expansion, several departments must be relocated at a different location, with the vacated space to be allocated to Public Safety for use in its expansion. It specifically included the reorganization of interrelated offices in the police department, the expansion of its locker/shower rooms, the redesign of the Traffic Management and the relocation of Public Works and other departments to a separate building in a new location.

To arrive at an optimal solution, the IDS Group performed user group interviews, site visits and observations, and provided several plan studies that highlighted uses within the existing spaces that can be better utilized with proper space planning.

Project Relevance
• Architectural planning and design for new or existing structures • Tenant improvements
• Alternatives analysis
• Preparation and presentation of models, renderings, and photo simulations • Structural, mechanical, & electrical engineering
• Zoning, planning & building approvals, permits, and other entitlements • Construction cost estimating
• Construction support
Project Team Members
Said Hilmy, PhD, PE, SE | Principal In Charge
John Silber, RA | Principal Architect | Project Manager Kevin Barnes | Mechanical Designer
Manny Ocampo, PE | Electrical Engineer
Bob Kramer | Electrical Project Lead
Faisal Dakhil | Cost Estimator
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 19 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of Irvine, Bill Barber Park Shade Structures
Brief Description
Colonel Bill Barber Marine Corps Memorial Community Park (Bill Barber Community Park) is a 39-acre park located at 4 Civic Center Plaza and offers an array of programs and events for the Irvine community. The city envisioned a shade structure for patrons while attending baseball and softball games at the park’s Dianna Manning Stadium and three (3) lighted softball fields. IDS prepared a shade study analysis for the city to ensure that a structure provided comfort to residents without obstructing lines of sight or cast shadows on the infield. Conceptual design, final design, bidding, and construction support were also completed by IDS for the project.

Project Relevance Project Team Members
• Architecture & Design
• Civil Design
• Signing & Striping
• Utility Coordination
• Concrete Walkways
• Topographic Survey
• Structural Engineering
• Site Improvements
Said Hilmy, PhD, PE, SE | Principal-In-Charge
Adrian Anderson, PE | Lead Civil Engineer
John Silber, AIA | Principal Architect
Jaime Rosenbach, PE, SE | Structural Engineer
Faisal Dakhil | Cost Estimator
Softball Field Shade Structure Concept Baseball Stadium Shade Structure Concept Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 20 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of San Bernardino, Speicher Memorial Park Improvements Brief Description
Speicher Memorial Park New Soccer Field Lighting System The new soccer fields planned for Speicher Multipurpose Field required a new LED lighting system designed for high school league soccer play.

Based on an initial site survey there was sufficient space to add circuitry for the new soccer field lighting systems to upgrade the current system to needed illumination. IDS provided plans to upgrade the power from the exiting 400 Amp 120/240V. The project included a complete photometric study of the project areas including electrical power load calculations on existing building panels and switchgear.

Speicher Memorial Park Ballfield Improvements
IDS is providing design services to revitalize this essential recreational destination with funds provided by the American Rescue Plan Act (ARPA) and a grant from the San Manuel Band of Mission Indians.

IDS services for the improvements which include:

Upgrades on Three (3) ballfields
• Removal and replacement of sod and/or turf
• Repair and Installation of irrigation and drainage system • Electrical system repair & replacement of light fixtures with LED • Grading
General Park Improvements:
• Removal and replacement of bleachers from northern fields • Installation of score boards at all 5 ballfields.
• Installation of trash receptacles and water fountains for new concession buildings.
• Construct 4” concrete area between and around Montgomery and Mason Fields.
• Parking lot pavement rehabilitation, striping, and accessibility improvements on both parking lots
Building Improvements:
• Removal and Replacement of existing concession stand building with new prefabricated building.

Project Relevance Project Team Members
• Landscape Design
• Civil Engineering
• Site Survey
• Architectural Design
• Structural Engineering
• Mechanical/Plumbing
Engineering
• Electrical Engineering
• Lighting Design
• Code and Accessibility
Compliance
• Energy Management
• Interior Design
• Cost Estimating
Said Hilmy, PhD, PE, SE | Principal In Charge
John Silber, AIA | Principal Architect
Joy Lyndes, PLA, FASLA | Landscape Architect
Kristen Gros, PLA, ALSA | Landscape Architect
Cisy Cao | Landscape Architect Designer
Mahsa Javaherian | Project Designer
Eduardo Fabros | Project Designer
Song Brandner | Project Architect
Adrian Anderson, PE | Civil Engineer
Paul Murray, PE | Civil Engineer
Jaime Rosenbach, PE, SE | Structural Engineer
Steven Collins | Electrical Engineer
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 21 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Description of Services Role of Firm
The City of Corona values the community connection to honor citizens who served in the armed forces.

Since 2012, the City Hall Veterans Monument has symbolized the service and fortitude of the five Armed Services branches. The memorial features two kiosks with stories of military personnel. The IDS project team took a thoughtful approach with the city’s ideas to develop a concept design that helps inspire and reflects the dedication of those who have served our great nation. IDS completed a concept design for the City of Corona Veterans Memorial by evaluating the following options:

Veterans Cove
The Veterans Cove Area at the entrance of City Hall represents an opportunity to expand the experience of the Monument. An additional granite sign and two granite walls will list the names of fallen soldiers with brick pavers in the gathering areas. The new improvements will be designed for daytime and evening visits and include new lighting technology for projecting names and lighting to highlight the new elements.

Veterans Memorial Plaza
The Veterans Memorial Plaza option provides an opportunity to extend the memorial gathering space into the South Lawn, which will make a memorable impact and experience on the environment. The project can include two new granite signs with lighting located along the pathway. In addition, six newly lit flag poles will be located in this South Lawn area as visual focal points visible from a distance and will help people announce this newly enhanced space. • Architecture
• Landscape Architecture
• Civil Engineering
• Structural Engineering
• Electrical Improvements
Team Members
Said Hilmy, PhD, PE, SE | Principal
Steven Collins, PE | Electrical Engineer
Manolito Ocampo, PE | Electrical Engineer
Michelle Huynh, PE | Electrical Engineer
Adrian Anderson, PE | Civil Engineer
Jason Wetterich, PE | Civil Engineer
Christian Chang | Civil Engineer
Abbegail Esperanza-Roman | Stormwater
Joy Lyndes | Landscape Architect
John Silber, AIA | Principal Architect
Ruoxi (Cisy) Cao | Landscape Designer
Kristen Gros, PLA | Landscape Architect
Victor Mercado, SE | Structural Engineer
City of Corona, Old Police Building Demolition
The old Police Department Building, originally constructed in 1978, is a two-story building that is approximately 24,000 SF and has been vacant since 2009.

IDS is providing civil engineering and architectural design services for the demolition of the Old Police Department Building and replacement with a reconfigured parking lot, block wall/fencing, irrigation and landscaping.

City of Corona
Veterans Memorial Plaza
Enhancement
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 22 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Orange County, Yale Navigation Center, Adaptive
Reuse & Conversion
Brief Description
The Yale Navigation Center project included completely gutting an aging and abandoned tilt up industrial building and the addition of 20,000 sq. ft. expanding the already 44,000 sq. ft. building.

The 64,000 sq foot building will be utilized for the rehabilitation and transitional programs for up to 425 homeless in Orange County with the goal of preparing them to return to normal life. The facility includes a full commercial kitchen, health care training facilities, and over 40 office spaces for the program administration staff. The expansion/ renovation cost was approximately $25 M.

The challenges of the accelerated schedule and the drive to achieve a good neighbor design that would be acceptable to the community were addressed through continuous interaction between all IDS Group disciplines, the contractor (who was brought in during the design phase) as well as the user group which included the County officials and facility operators. Constant communication was a must to address all the design challenges as well as several public outreach workshops with the community and full cooperation from the (a) funding sources (b) facility future operator (c) contractor, and (d) jurisdictions including the County building officials, and City of Santa Ana. These meetings in conjunction with the implementation of the lessons learned from the operation of other shelters in Southern California were very effective causing positive acclamations and feedback from the user groups and the community at large.

Project Relevance
• Architectural planning and design for new or existing structures • Tenant improvements
• Alternatives analysis
• Preparation and presentation of models, renderings, and photo simulations • Structural, mechanical, and electrical engineering
• Zoning, planning & building approvals, permits, and other entitlements • Construction cost estimating
• Construction support
Project Team Members
Said Hilmy, PhD, PE, SE | Principal In Charge
John Silber, RA | Principal Architect / Project Manager Shelley Sivak, RA, LEED AP | PA / Interior Design
Song Brandner, RA, LEED GA | Project Architect
Jaime Rosenbach, PE, SE | Structural Engineer
Victor Mercado, PE, SE | Structural Engineer
Darren Smith, PE | Electrical Engineer
Bob Kramer | Electrical Project Lead
Michael Reed | Lighting Design
Faisal Dakhil | Cost Estimator
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 23 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of Santa Ana City Hall Architectural Programming
& Tenant Improvements
Brief Description
IDS is providing Space Planning, Architectural and Engineering design services for the City of Santa Ana City Hall.

Second Floor Tenant Improvements:

The 10,700 SF office area for the Engineering/Developer Department is being reconfigured to include a training room featuring a dividing wall for flexible meeting spaces, two conference rooms, a lecture/training room, perimeter offices, interior cubicle space, kitchen/breakroom, ancillary spaces, restrooms, and storage areas.

The 2nd floor is occupied by the Parks, Recreation and Community Services Agency (PRCSA). The 8,500 SF department is being reconfigured to include space for 30 staff, featuring six (6) window facing offices, central open cubicle spaces, a dedicated large conference room, kitchen, storage room, and ancillary areas. The IDS design team is also aiding the City with furniture planning.

Third Floor Tenant Improvements:

The 2,300 SF third floor modifications include the conference room entryway, large open workspace, and kitchen. Adjacent restrooms also require redesign to meet ADA requirements.

Fifth Floor Tenant Improvements:

The City’s Human Resources Department is located on the fifth floor and will include a dedicated space for staff workspaces. A central open corridor space and the reception area located closest to the elevator is being renovated. The elevator lobby is being enclosed, finishes & doors upgraded per code and the addition of a second door in the rear nearby the second egress.

Project Relevance
• Architectural planning and design for new or existing structures • Tenant improvements
• Alternatives analysis
• Preparation and presentation of models, renderings, and photo simulations • Structural, mechanical, and electrical engineering
• Zoning, planning & building approvals, permits, and other entitlements • Construction cost estimating
• Construction support
Project Team Members
Said Hilmy, PhD, PE, SE | Principal In Charge
John Silber, RA | Principal Architect | Project Manager Jaime Rosenbach, PE, SE | Structural Engineer
Steven Collins, PE | Electrical Engineer
Manny Ocampo, PE | Electrical Engineer
Anthony Zanotti, PE | Mechanical Engineer
Mike Lin, PE | Plumbing Engineer
Ronaldo Magno | Plumbing Designer
Faisal Dakhil | Cost Estimator
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 24 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Riverside County Sheriff’s Department
Tenant Improvements at Various Facilities
Brief Description
The Riverside Sheriff’s department pursued an ambitious plan to design, and construct 38 projects within 6 months, due to funding requirements.

The 38 projects were under six categories including (1) Tenant Improvements (2) Security Improvements (3) Plumbing/ Showers/ Misc. (4) Re-roofing (5) Overhead Structures, and (6) Low Voltage (Cameras & Key-Card Access). The facilities cover several locations in Riverside County including:
• Criminal Justice Building, 5th Floor Remodel
• Cois M. Byrd Detention Break room and
Restroom Remodel
• Smith Correctional Facility Classroom Bldg.
• Coroners Parking Lot Improvement
• Blythe Sheriff Facility Roof Replacement
• John J. Benoit Detention Center Shade
Structure
• Palm Desert Sheriff and Dispatch Center
Relocation and Expansion
Associated projects from different funding sources included mechanical and electrical upgrade studies at the Ben Clark Training Center and Shooting Range, and the parking lot improvement and expansion at Coroner’s Facility in Perris. For the Riverside Orange Street Facility, The IDS team provided architectural and engineering design services for tenant improvements for the kitchen, men and women’s locker rooms, public restroom remodel within the lobby area, second floor staff restroom remodel, and office areas. Architectural and engineering design services were completed for the Riverside Sheriff’s Department facilities.

Project Relevance
• Architectural planning and design for new or existing structures • Tenant improvements
• Alternatives analysis
• Preparation and presentation of models, renderings, and photo simulations • Structural, mechanical, & electrical engineering
• Zoning, planning & building approvals, permits, and other entitlements • Construction cost estimating
• Construction support
Project Team Members
Said Hilmy, PhD, PE, SE | Principal In Charge
John Silber, AIA | Principal Architect
Manny Ocampo | Electrical Engineer
Ronaldo Magno | Plumbing Designer
Adrian Anderson, PE | Civil Engineer
Faisal Dakhil | Cost Estimator
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 25 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of Lancaster, Parks Revitalization & Renovations
Description of Services
Samaritan’s Purse Park (Formerly El Dorado Park) Revitalization & New Community Center
The Existing Samaritan’s Purse Park is located within a densely populated area and surrounded by established residential neighborhoods, an elementary school, and commercial businesses. The City of Lancaster is focused on creating renovated amenities in this popular existing neighborhood park to improve and expand community resources within the park based on community input.

IDS is providing architectural and engineering services for the removal of the existing preschool/community building, construction of a new pre-school/community building, and including new recreational features such as a half-court basketball court with lighting, splash pad, and skate area within the park. Additionally, the existing dirt path and exercise equipment at the northern end of the park will be replaced with a decomposed granite surface and eleven workout stations with new exercise equipment along the path. ADA access will be incorporated into walkways and recreational amenities throughout the park.

The future enhancements will consist of expanding the playground and replacing existing equipment with types that are inclusive for people of all ages and abilities, including a swing set with 8 swings.

Mariposa Park Renovations
IDS is providing architectural and engineering services for the renovation of Mariposa Park. The park is surrounded by an established residential neighborhood and has an elementary school immediately adjacent to the park. The park currently features a small playground, eight barbecue grills and charcoal bins with picnic tables, a covered picnic area, a softball field, a 1-quarter mile decomposed granite exercise trail with stand-alone fitness equipment, and an approximately 1500 SF activity center with kitchen, activity room, restrooms, and a maintenance closet. The renovation of the park will be in two phases. In general, renovation will include:

Phase 1 - Playground Renovation
• Demolition
• Minor Grading
• Surfacing
• Equipment Replacement
Phase 2 - On-site Improvement
• Activity Building Renovation
• ADA Accessibility Improvements
• Grounds Improvements
• Park Lighting Improvements
Role of Firm
• Landscape Design
• Civil Engineering
• Site Survey
• Architectural Design
• Structural Engineering
• Mechanical/Plumbing
Engineering
• Electrical Engineering
• Lighting Design
• Code and Accessibility
Compliance
• Energy Management
• Interior Design
• Cost Estimating
Team Members
Said Hilmy, PhD, PE, SE
Principal-in-Charge
John Silber, AIA
Principal Architect
Joy Lyndes, PLA, FASLA
Landscape Architect
Kristen Gros, PLA, ALSA
Landscape Archiect
Adrian Anderson, PE | Civil
Jaime Rosenbach, SE | Structural
Steven Collins, PE | Electrical
Manny Ocampo | Electrical
Ronaldo Magno | Plumbing
Mahsa Javaherian| Designer
Eduardo Fabros | Designer
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 26 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of Downy, Rio San Gabriel Park Green, Safe &
Active Park Improvements
Brief Description
IDS is working with the City of Downy to provide full design services for the replacement of the entire southerly parking lot, stabilize the subgrade and install new curbs, gutters, and pavement.

The design work encompasses the enhancement of pedestrian amenities, addressing damaged sidewalks, walkways, and access ramps. IDS is introducing new decomposed granite trails and walkways, accompanied by concrete curbs throughout the park perimeter, connecting all park amenities to the San Gabriel River regional bike path.

Part of the new plan is the integration of bike path resting stations, featuring shade structures, benches, bike racks, water bottle filling stations, and bike repair stations. The project also includes the establishment of a new interpretive native garden, complete with wayfinding and educational signage. Bioswale and drywell features are being incorporated for sustainable water management, and solar-powered pedestrian lights and poles will be installed along park walkways and trails.

Additional improvements involve the installation of new shade structures with picnic stations, the creation of a waste containment area to conceal and secure park dumpsters, and the placement of new trash receptacles throughout the park, to create a more accessible, aesthetically pleasing, and environmentally sustainable public space.

Project Relevance Project Team Members
• Civil Engineering
• Architecture
• Landscape Architecture
• Irrigation Design
• Structural Engineering
• Mechanical/Plumbing Engineering
• Electrical Engineering / Lighting
Design
• Code and Accessibility Compliance
• Cost Estimating
Said Hilmy, PhD, PE, SE | Principal In Charge
Joy Lyndes, PLA, FASLA | Landscape Architect
Kristen Gros, PLA, ALSA | Landscape Architect
Adrian Anderson, PE | Civil Engineer
Paul Murray, PE | Civil Engineer
Jaime Rosenbach, PE, SE | Structural Engineer
Darren Smith, PE | Electrical Engineer
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 27 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of La Habra, Vista Grande Dog Park
Brief Description
IDS is working with the City of La Habra to provide architecture and engineering design services for a dog park and restroom at Vista Grande Park. IDS completed a site assessment of the park and currently the team is discussing the dog park program with city stakeholders. Upon a final design, IDS will provide the city with plans, specifications, and a cost estimate that will then be approved for permit, bidding, and construction. Key dog park elements include a dog course kit theme, drinking fountain for people and dogs, benches, waste containers, a sod/grass surface, irrigation and fencing. An accessible to the Vista Grande Park trail and a shared irrigation system will also be implemented into the project.

Project Relevance Project Team Members
• Landscape Architecture
• Civil Engineering
• Preliminary Design
• Construction Documents
• Cost Estimates
Said Hilmy, PhD, PE, SE | Principal In Charge
John Silber, AIA | Principal Architect
Joy Lyndes, PLA, FASLA | Landscape Architect
Kristen Gros, PLA, ALSA | Landscape Architect
Mahsa Javaherian | Project Designer
Adrian Anderson, PE | Civil Engineer
Paul Murray, PE | Civil Engineer
Jaime Rosenbach, PE, SE | Structural Engineer
Manny Ocampo | Electrical Engineer
Ronaldo Magno | Plumbing Designer
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800

IDS IDS GROUP
PROJECT:

CHECK BY:

TITLE:

DESIGN:

PROJECT #:

DATE:

SCALE:

SKETCH #:

REV:

VISTA GRANDE DOG PARK & PUBLIC RESTROOM

KG / MMM JL / MMM
23X011.01
DOG PARK PRELIMINARY DESIGNS OPTION 1 08/16/2023
L-1
1" = 50' -
OPTION 1

SCATTERED BENCH

SEATING UNDER

CANOPY TREES

MAINTENANCE ACCESS

LARGE DOG AGILITY

EQUIPMENT AREA

DRINKING

FOUNTAIN ON

CONCRETE PAD
LARGE
DOGS

MAINTENANCE ACCESS

DIVIDED DOUBLE

GATE ENTRY

DECORATIVE DOG

SILHOUETTES ON

PERIMETER FENCE

DECORATIVE DOG

SILHOUETTES ON

PERIMETER FENCE

DRINKING FOUNTAIN ON

CONCRETE PAD

SMALL DOG AGILITY

EQUIPMENT AREA

SCATTERED

BENCH SEATING

UNDER CANOPY
TREES

SCATTERED BENCH

SEATING UNDER

CANOPY TREES

ANTI-MICROBIAL

SYNTHETIC TURF
N

VEGETATION SCREENING

BETWEEN LARGE & SMALL

DOG PARKS

PET WASTE

RECEPTACLE SMALL
DOGS
5%
SLOPE
L
S
L
S
S
M
M S
L S
S
M
L
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800

IDS IDS GROUP
PROJECT:

CHECK BY:

TITLE:

DESIGN:

PROJECT #:

DATE:

SCALE:

SKETCH #:

REV:

VISTA GRANDE DOG PARK & PUBLIC RESTROOM

KG / MMM JL / MMM
23X011.01
DOG PARK PRELIMINARY DESIGNS OPTION 2 08/16/2023
L-2
1" = 50' -
OPTION 2

CLUSTERED BENCHES

UNDER CANOPY TREES

MAINTENANCE ACCESS

DRINKING FOUNTAIN W /

BOTTLE FILLING STATION

ON CONCRETE PAD

DRINKING FOUNTAIN W /

BOTTLE FILLING STATION

ON CONCRETE PAD
LARGE
DOGS
SMALL
DOGS

MAINTENANCE ACCESS

DIVIDED DOUBLE

GATE ENTRY

DECORATIVE DOG

SILHOUETTES ON

PERIMETER FENCE

DECORATIVE DOG

SILHOUETTES ON

PERIMETER FENCE

CLUSTERED BENCHES

UNDER CANOPY TREES

DECORATIVE

LANDSCAPE BOULDERS

FOR NATURAL PLAY

DECORATIVE

LANDSCAPE BOULDERS

FOR NATURAL PLAY

NATURAL TURF
N

PET WASTE
RECEPTACLE 11%
SLOPE
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 28 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
City of Irvine, Great Park Concession Stands
Upgrades
Brief Description
IDS is working with the City of Irvine to upgrade four (4) existing Orange County Great Park Sports Park Concessions Facilities. The project brings the city’s concession facilities into accordance with the County of Orange Health Care Agency (HCA). The agency requires facilities where food and beverages for human consumption are prepared and served to obtain a health permit.

IDS performed interior functional upgrades with a concept design which includes outdoor areas for barbeques with architectural shade covers in line with the existing design. Each concession stand requires new kitchen equipment along with mechanical, plumbing, and electrical upgrades. This project was an exercise in coordination and creativity to fit all desired program elements into existing spaces.

Project Relevance Project Team Members
• Landscape Design
• Civil Engineering & Surveying
• Architecture & Design
• Electrical Engineering
• Mechanical - HVAC &
Plumbing
• Structural Engineering
• Interior Design and Space
Planning
• BIM
• Specifications, CSI
• Construction Support
• Building/Facility Condition
Assessment
Said Hilmy, PhD, PE, SE | Principal In Charge
Adrian Anderson, PE | Project Manager
Jaime Rosenbach, PE, SE | Structural Engineer
John Silber, AIA | Principal Architect
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

CITY OF GARDENA
PUBLIC WORKS DEPARTMENT 29 STATEMENT OF QUALIFICATIONSArchitecture & Landscape Architecture City of Corona, City Hall Veteran’s Memorial Enhancements & Old Police Building Demolition Contact: Tracy Martin, Senior Project Manager, Public Works Department Phone: 951.817.5880 | Email: [email protected] | Project Dates: 2021 - Ongoing City of San Bernardino, Speicher Memorial Park Improvements Contact: Mr. Daniel Hernandez, Agency Director of Public Works, Operations, and Maintenance/ENG Phone: 909.384.5002 ext. 5924 | Email: [email protected] | Project Dates: 2020 - on-going City of Lancaster, Parks Revitalization & Renovations
Contact: Mr. Frank Lujan Project Manager
Phone: 661.723.6225 | Email: [email protected] | Project Dates: 2023 - Ongoing City of Irvine, Great Park Concession Stands Upgrades
Contact: Ms. Stacy DeLong, Senior Project Manager
Phone: 949.473.1237 | Email: [email protected]| Project Dates: 2020 - 2024 City of Santa Ana Architectural Improvements
Contact: Ms. Gabriela Lomeli, Project Manager
Phone: 714.565.2692 | Email: [email protected] | Project Dates: 2020 - on-going County of Riverside Sheriff Department | Planning and A/E Improvement Projects Contact: Mr. Ramon Tadrous, Director, Project Management Office Phone: 951.955.5951 | Email: [email protected] | Project Dates: 2021 - 2022

REFERENCES
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 30 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
IDS GROUP, INC.

City of Gardena On-Call Professional Services
2024 - 2027
Title - Association Hourly Rate
Principal $248
Associate Principal $233
Senior Project Manager | Associate $224
Senior Planner $224
QA/QC Manager $224
Registered Architect | Engineer $209
Project Manager $209
Senior Architect | Engineer $196
Senior Cost Estimator $186
Project Architect | Engineer $186
Senior Designer $180
Designer Architect |Engineer $170
Specifications Writer $170
Engineering Designer - BIM $147
Architectural Job Captain | Designer $140
CAD Drafting Engineer | Architect $125
Office Administration $77
Expenses such as, but not limited to plan check fees, permits inspections, testing services, title company fees, special delivery charges, plotting/presentation boards, maps, aerial photographs, and reprographics / illustrations that may be required for community or other stakeholder presentations, shall be billed to the owner at Consultant’s direct cost plus 5%.

FEE SCHEDULE
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7

CITY OF GARDENA
PUBLIC WORKS DEPARTMENT 31 STATEMENT OF QUALIFICATIONSArchitecture & Landscape Architecture Resumes for Key Personnel have been included on the following pages.

RESUMES
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 32 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
John Silber, AIA
Principal Architect/Project Manager
9 Over 30 years of experience
9 Mr. Silber has mastered the interface between community design expectations, urban in-fill architecture and modern code standards for fire/life safety, energy, and accessibility.

Education: Master of Architecture, Southern California Institute of Architecture (SCI-ARC) Professional Credentials: Architect: CA #C15573
An award-winning architect with more than three decades of extensive experience working on a wide range of projects both the public and private sectors. John’s upfront planning and design efforts are instrumental in creating sites and structures that fit seamlessly with their surroundings, are carefully attuned to their use, and contribute to making lasting and meaningful places. John’s projects have ranged in scope from minor facility upgrades to new construction, assessment and renovation projects for various project types including, office buildings, commercial buildings, education, and healthcare.

As Project Manager, John will be responsible for overseeing the technical adequacy and design of all work orders assigned by the City of Gardena and will monitor the progress of each project to ensure the City’s goals and objectives are intertwined within the design.

Relevant Project Experience:
• City of Irvine Civic Center Public Safety Tenant Improvements | Irvine, CA • City of Laguna Beach, Fire Station #4 Seismic Evaluation | Laguna Beach, CA • City of Laguna Beach, Glenneyre Parking Structure Analysis & Rehabilitation | Laguna Beach, CA • City of Laguna Beach, South Main Beach Restroom Design | Laguna Beach, CA • John Wayne Airport, Terminal A & B Seismic Upgrades & Other Improvements | Santa Ana, CA • County of Orange, Yale Navigation Center | Santa Ana, CA • City of Commerce Veterans Memorial Park Recreation Center | Commerce, CA • City of Santa Ana City Hall Tenant Improvements | Santa Ana, CA • City of Anaheim West Tower Upgrades and Tenant Improvements | Anaheim, CA • City of Industry, New Banquet Hall Expo Center | City of Industry, CA • County of Orange, El Toro Library Modernization | Lake Forest, CA • County of Orange, Brea Library Renovation | Brea, CA
• County of Orange, Los Alamitos Rossmoor Library Refresh | Los Alamitos, CA • Riverside County Sheriff’s, Tenant Improvements at Various Facilities | Various Locations • City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Orange Water Division Warehouse Replacement & Relocation | Orange, CA • City of Norwalk Transportation & Public Facility Improvement | Norwalk, CA Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 33 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Joy Lyndes, PLA, FASLA
Project Manager
9 Over 35 years of experience
9 Ms. Lyndes’ focus is to meet user needs through sensitive and appropriate preservation, rehabilitation, restoration, and reconstruction, creating functional, interactive, and engaging spaces for people.

Education: Master of Landscape Architecture, University of Arizona Professional Credentials: Professional Landscape Architect: CA #C4183; Historic Preservation Certification Ms. Lyndes brings a broad range of municipal, local, and state agency expertise specializing in revitalizing urban parks, trails, open spaces, and playgrounds. Her experience includes landscape programming, planning, design, construction documents, and construction administration for local, state, and federally funded projects. Joy brings over 35 years in landscape planning, design, and construction oversight of complete streets, facilities programming, and smart growth. In addition, she focuses on health and well-being as one of the critical priorities in community regeneration framework, fostering long-term health outcomes in Southern California neighborhoods and public spaces.

Joy will be responsible for overseeing the landscape architecture technical adequacy and design of work orders assigned by the City of Gardena and will monitor the progress of each project to ensure the City’s goals and objectives are intertwined within the design.

Relevant Project Experience:
• City of Azusa Dog Park | Azusa, CA
• City of La Habra, Vista Grande Dog Park | La Habra, CA • City of Downey, Rio San Gabriel Park, Green, Safe & Active Park Improvements | Downey, CA • City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of San Bernardino, Speicher Memorial Park Ballfield Improvements | San Bernardino, CA • City of Corona Veterans Memorial Enhancement Project | Corona, CA • County of Orange Yale Homeless Shelter | Orange, CA
• Aerospace Corporation Pocket Park | El Segundo, CA
• Pacific View Academy, Arts Culture, and Ecology Campus | Encinitas, CA • Centered Ground, Mixed-use Wellness Center Landscape Conceptual Design | Carlsbad, CA • Leo Carrillo Historic Ranch Park | Carlsbad, CA
• Heritage Building & Development Inc., Quail Meadows Streetscape Design | San Diego, CA • University of Arizona Bryant Banister Laboratory of Tree Ring Research, Tucson, AZ Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 34 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Shelley Sivak, RA, LEED AP
Project Architect
Education: Master of Architecture, California State Polytechnic University, Pomona Professional Certifications: Professional Architect: CA #C33767; LEED Accredited Professional
Ms. Sivak has been involved in the fields of architecture and interior design for more than 25 years, shaping space, and bringing life to both urban and suburban settings, which create a strong sense of place. Shelley specializes in reviewing the state of the existing building and evaluates’ its size and layout for the intended use, identifying the need for repair, renovation, and expansion.

Relevant Project Experience:
• City of Irvine Civic Center Public Safety Tenant Improvements | Irvine, CA • Placentia Library District, Outdoor Library & Loading Dock | Plancentia, CA • Los Angeles County Library Headquarters Tenant Improvements Design | Los Angeles, CA • City of Anaheim West Tower Upgrades and Tenant Improvements | Anaheim, CA • County of Orange, Yale Navigation Center | Santa Ana, CA • City of Industry, New Banquet Hall Expo Center | City of Industry, CA • County of Orange, El Toro Library Modernization | Lake Forest, CA • County of Orange, Brea Library Renovation | Brea, CA
• County of Orange, Los Alamitos Rossmoor Library Refresh| Los Alamitos, CA Bradley Mansfield, AIA
Project Architect
Education: BS, Business Administration, Phoenix University Professional Certifications: Professional Architect: CA #C27303 Bradley is a licensed architect who takes the initiative to complete processes of coordinated project deliverables and management. He is well-versed in various responsibilities including contracts, scheduling, budgeting, negotiating, inclusive team building, mentoring, collaborating, client management, quality assurance, quality control and value engineering.

Relevant Project Experience:
• Department of General Services, Junipero Serra Building Security System Replacement | Los Angeles, CA • Department of General Services, Patton Kitchen Assessment | Patton, CA • Los Angeles CCD, LA Pierce College, Mobile Restroom Planning | Woodland Hills, CA • Los Angeles CCD, Districtwide Hydration Station Initiation Program | Various Locations, CA • Los Angeles CCD, Mission College Child Development Center Roof Replacement | Santa Clara, CA • Los Angeles CCD, Pierce College Building Renewal Studies | Woodland Hills, CA Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 35 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Song Brandner, RA, LEED GA
Project Architect
Education: Master of Architecture, University of Arizona Professional Certifications: Professional Architect: CA #C32814; LEED Green Associate Ms. Brandner specializes in architecture for public and private projects, identifying and leveraging the unique points of difference and contexts to craft tailored, custom designs that challenge assumptions about how spaces should and can be used. Maintaining an unwavering focus on the details, Song creates projects successful, from assessment to design development through construction administration.

Relevant Project Experience:
• City of Irvine, Great Park Western Sector Restroom Upgrades | Irvine, CA • City of Irvine Bill Barber Park Shade Structure | Irvine, CA • City of Orange, Water Division Warehouse | Orange, CA • John Wayne Airport, Terminal A & B Seismic Upgrades & Other Improvements | Santa Ana, CA • County of Orange, Yale Navigation Center | Santa Ana, CA • City of Rialto City-wide Park Assessment and Improvements | Rialto, CA • LA County Development Authority, Kitchen Replacements at Various Locations | Los Angeles County • LA County Development Authority, Bathroom Replacements at Various Locations | Los Angeles County Matthew Miller, AIA, NCARB, LEED AP
Project Architect
Education: Bachelor of Architecture, University of Oregon Professional Certifications: Professional Architect: CA #C36280; LEED Accredited Professional; NCARB
Mr. Miller has over 15 years of experience in architecture. Matt has the ability to transfer design intent into instructions for building. He has experience in a broad range of educational, civic and institutional projects and he brings extensive publicly funded project experience. His overall knowledge of all the many layers of building systems and the ability to coordinate, denote, and manage creates a strong and complete project foundation.

Relevant Project Experience:
• City of Placentia, Powell Library Building Conversion | Placentia, CA • Los Angeles County, Obregon Park Gym Roof Replacement | East Los Angeles, CA • Riverside County Sheriff’s Department, Palm Desert Sheriff Station Expansion | Palm Desert, CA • County of Riverside Department of Waste Resources Lamb Canyon Landfill Public Restroom & Administrative Building | Beaumont, CA
• City of Lancaster, El Dorado Park | Lancaster, CA
• South Bay Auto Auction Tenant Improvements | Gardena, CA Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 36 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Kristen Gros, PLA, ASLA, LEED AP ND
Landscape Architect
Education: Master of Landscape Architecture, California Polytechnic University, Pomona Professional Certifications: Professional Landscape Architect: CA #C6288; LEED Accredited Professional Neighborhood Development
Ms. Gros is a highly effective leader who brings a multi-disciplinary and sustainability-focused understanding to landscape planning, design, and irrigation systems. She is a talented team player and able to communicate project needs while managing budgets, leading design teams, and developing strategic and operational plans for firmwide future growth. Ms. Gros is a LEED Accredited Professional in Neighborhood Development (ND).

Relevant Project Experience:
• Centered Ground, Mixed-use Wellness Center Landscape Conceptual Design | Carlsbad, CA • City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of Azusa Dog Park | Azusa, CA
• City of La Habra, Vista Grande Dog Park | La Habra, CA • City of Downey, Rio San Gabriel Park, Green, Safe & Active Park Improvements | Downey, CA • City of San Bernardino, Speicher Memorial Park Ballfield Improvements | San Bernardino, CA Ruoxi (Cisy) Cao, LEED AP ND, SITES AP
Landscape Architect Designer
Education: Master of Landscape Architecture, University of Southern California Professional Certifications: LEED Accredited Professional Neighborhood Development, SITES Accredited Professional
Ms. Cao is a passionate designer who worked on both public projects (streetscape, parks, recreation facilities, plazas and sports field projects) as well as private projects (housing development, medical facilities) throughout the state of California. Ms. Cao is a LEED Accredited Professional in Neighborhood Development (ND) and SITES Accredited Professional and works as vice president of the communication and visibility of San Diego Chapter of ASLA.

Relevant Project Experience:
• City of San Bernardino, Speicher Memorial Park Ballfield Improvements | San Bernardino, CA • City of Azusa Dog Park | Azusa, CA
• City of Downey, Rio San Gabriel Park, Green, Safe & Active Park Improvements | Downey, CA • City of San Diego, Marcy Neighborhood Park | San Diego, CA • City of San Diego, Dusty Rhodes Park | San Diego, CA
• City of San Diego, Pepper Park | San Diego, CA
• San Fernando Road Park | Los Angeles, CA
• Harbor City Skate Plaza | Los Angeles, CA
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 37 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Jaime Rosenbach, PE, SE
Senior Structural Engineer
Education: MS, Structural Engineering, California Polytechnic University, Pomona Professional Credentials: Professional Structural Engineer, CA #S5186; Professional Civil Engineer, CA #C42855
With over 40 years of experience in structural design, Mr. Rosenbach has been involved with new structures, evaluating and retrofitting existing structures, and remodeling and modernizing existing buildings. In addition, he has conducted and reported numerous forensic seismic investigations. Jaime has extensive field experience, providing construction administration, code compliance review, and plan check services for multiple projects.

Relevant Project Experience:
• City of Downey, Rio San Gabriel Park, Green, Safe & Active Park Improvements | Downey, CA • City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of San Bernardino, Spiecher Memorial Park Ballfield Improvements | San Bernardino, CA • Topanga Canyon Charter School, Maintenance Vehicle & Pedestrian Access Way Design, Paving and Drainage Repairs | Topanga, CA
• City of Orange Water Division Warehouse Replacement & Relocation | Orange, CA • City of Irvine Bill Barber Park Shade Structure | Irvine, CA Darren Smith, PE, BEAP
Lead Mechanical/Plumbing Engineer
Education: BS, Mechanical Engineering Technology, California Polytechnic University, Pomona
Professional Credentials: Professional Mechanical Engineer, California #M30841; ASHRAE (Building Energy Auditing Professional)
Darren Smith is a registered mechanical engineer with over 25 years of experience in design bid build and designbuild projects. With extensive experience in designing and managing numerous construction projects, Darren brings cross-communication at various levels of project ownership and the flexibility needed for project task order assignments.

Relevant Project Experience:
• City of Downey, Rio San Gabriel Park, Green, Safe & Active Park Improvements | Downey, CA • City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • County of Orange, Yale Navigation Center | Santa Ana, CA • City of Laguna Beach, Fire Station #4 Seismic Evaluation | Laguna Beach, CA • City of Laguna Beach, South Main Beach Restroom Design | Laguna Beach, CA • County of Orange, El Toro Library Modernization | Lake Forest, CA Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 38 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Steven Collins, PE, LEED AP
Lead Electrical Engineer
Education: MS, Electrical Engineering, Rensselaer Polytechnic Institute Professional Credentials: Professional Electrical Engineer: California #E22805; LEED Accredited Professional
Mr. Collins brings over 25 years of experience in Electrical Engineering for Building Systems and has expertise in municipal, education, commercial, and healthcare markets. His experience includes field investigation, design, and specifications for electrical service entrance equipment, standard and emergency distribution systems, lighting systems, controls, power-to-utilization equipment and devices, fire alarm systems, and telecommunication and low-voltage raceway systems.

Relevant Project Experience:
• City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of Perris Morgan Park Parking Lot Expansion | Perris, CA • Department of Veteran’s Administration, Air Handler Unit Replacement | Barstow, CA • The Aerospace Corporation Lighting Replacement | Los Angeles, CA • Orange County Sheriff’s Department, Central Men’s Jail Lighting Retrofit | Orange, CA Adrian Anderson, PE
Lead Civil Engineer
Education: BS, Civil Engineering, California State University, Long Beach Professional Certifications: Professional Civil Engineer: CA #C60955 Mr. Anderson has over 25 years of experience and is well-versed in public-work infrastructure improvements, utility coordination, active transportation, traffic engineering, signal timing, signing and striping, drainage, and street design. Throughout his career, he has managed public agency projects for street rehabilitation projects, street widening and new street/ highway projects, drainage improvement projects, right-of-way projects, development project plan checks for various agencies, urban trail projects, and other active transportation facilities.

Relevant Project Experience:
• City of San Bernardino, Spiecher Memorial Park Ballfield Improvements | San Bernardino, CA • City of Downey, Rio San Gabriel Park, Green, Safe, and Active Park Improvements | Downey, CA • Riverside County Sheriff Dept., Coroner Facility Parking Lot Improvements | Perris, CA • City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of Laguna Beach, Pearl Street Pedestrian Safety Assessment | Laguna Beach, CA • City of Manhattan Beach, Polliwog Park Fitness Station Installation | Manhattan Beach, CA • City of Irvine, Great Park Concession Building Upgrade | Irvine, CA Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 39 CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

STATEMENT OF QUALIFICATIONS
Architecture & Landscape Architecture
Said Hilmy, PhD, PE, SE, LEED AP
Principal /Contract Administrator
Education: Doctorate, Structural Engineering, Cornell University; MS, Structural Engineering, Cornell University
Professional Credentials: Professional Structural Engineer: CA #S3680; Professional Civil Engineer: CA C43988; LEED Accredited Professional Dr. Hilmy has over 35 years of experience in structural engineering design and analysis and project management with strong expertise in the design and upgrade of steel, concrete, and wood structures. Recognized for his knowledge of code developments and seismic retrofit, Dr. Hilmy has worked on more than $3 billion engineering projects and more than 200 seismic assessments and retrofit projects in California.

Mr. Hilmy provides organizational leadership with a focus on quality control in the delivery of construction documents and excellent customer service.

Relevant Project Experience:
• City of Irvine Civic Center Public Safety Tenant Improvements | Irvine, CA • City of Laguna Beach, Fire Station #4 Seismic Evaluation | Laguna Beach, CA • City of Laguna Beach, Glenneyre Parking Structure Analysis & Rehabilitation | Laguna Beach, CA • County of Orange, Yale Navigation Center | Santa Ana, CA • City of Santa Ana City Hall Tenant Improvements | Santa Ana, CA • City of Downey, Rio San Gabriel Park, Green, Safe & Active Park Improvements | Downey, CA • City of Murrieta, Town Square Park Amphitheater | Murrieta, CA • City of Rialto City-wide Park Assessment and Improvements | Rialto, CA • City of San Bernardino, Speicher Memorial Park Ballfield Improvements | San Bernardino, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of Carson, Wilmington Ave Street Improvement Project | Carson, CA • Los Angeles World Airports, Roadways, Utilities & Enabling (RUE), Century Blvd & La Cienega Street Rehabilitation | Los Angeles, CA
Faisal Dakhil
Cost Estimator
Education: MS, Civil Engineering, University of Southern California; BS, Civil Engineering, University of Southern California Mr. Dakhil has over 30 years of pre-construction, construction management, and estimating experience in a broad spectrum of projects ranging in value from $1 million to more than $250 million. Faisal has a long track record of successful jobs coming in under budget and on time, resulting in substantial client savings.

Relevant Project Experience:
• City of Lancaster, El Dorado Park Revitalization | Lancaster, CA • City of Lancaster, Mariposa Park Renovation | Lancaster, CA • City of Commerce Veterans Memorial Park Recreation Center | Commerce, CA • City of Irvine, Bill Barber Park Shade Structures | Irvine, CA • City of Glendora Finkbiner Park | Glendora, CA
• City of Manhattan Beach, Lot 3 Parking Structure Seismic Evaluation | Manhattan Beach, CA Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 SOLUTIONS t h r o u g h i n t e g r a t e d d e s i g n 1 P e t e r s C a n y o n R d . , S u i t e 1 3 0 I r v i n e , c a 9 2 6 0 6
T : 9 4 9 . 3 8 7 . 8 5 0 0       F : 9 4 9 . 3 8 7 . 0 8 0 0 w w w . i d s g i . c o m
Docusign Envelope ID: AD92DC43-3193-4498-8A54-F8C97F0F29E7 Consultant Agreement with Iteris, Inc Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH ITERIS, INC
This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena, a municipal corporation (“City”) and Iteris, Inc, a DE Corporation (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• Traffic Engineering

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 2
services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RFQ, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 3
this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 4
be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 5

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfinsured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 6
losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 7
recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 8

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 9
publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 10
based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer
To Consultant: Iteris, Inc
1700 Carnegie Avenue, Suite 100
Santa Ana, CA 92705
Attn: Steven Bradley
Regional Vice President
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 11
that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 12
attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with Iteris, Inc Page 13
IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – Iteris, Inc
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Khristine Arakaki
Vice President, Legal
Regional Vice President
Steven Bradley
Exhibit A
Request for Qualifications (RFQ)
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

REQUEST FOR QUALIFICATIONS (RFQ)
FOR

GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION

MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,

ARCHITECTURE AND LANDSCAPE ARCHITECTURE,

GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL

TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:

MAY 2024
Memoranda:

Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.

City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A” Gardena Standard Professional Services Agreement…………….……………… 10 Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 1 | Page

SECTION I

NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services NOTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on-call services related to our Public Works Capital Improvement Program and General Engineering. The work will be assigned on an as-needed basis for various projects in the City.

The Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.

The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/ Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217-9643 or [email protected].

BACKGROUND
The City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council-Manager form of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built-out, with a few remaining undeveloped parcels and a 9.4-acre wetland preserve, Gardena Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.

The Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.

The existing city-owned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City discharge to the LACSD interceptor at over 100 locations.

The existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).

The collection system pipes within the City primarily discharge to the Dominguez Channel.

Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.

The City has six (6) parks with community buildings, two gymnasiums, and a parkette. Additionally, the Gardena Wetland Preserve is situated next to Johnson Park. The City is currently constructing a new pool and senior center community center. Furthermore, the newly acquired Chase Bank Building on Rosecrans Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 2 | Page
Boulevard is slated to become a new Community Center, and Mas Fukai Park is in the construction document phase for improvements.

SUBMITTAL DEADLINE
Complete proposal/Statement of Qualification must be submitted no later than Thursday, June 13, 2024, at 2:00 p.m. PST. Three (3) hard copies and one complete PDF copy (on CD or memory stick) shall be address to:

City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Attn: Kevin Kwak, Assistant Public Works Director
The City currently anticipates conducting the selection process according to the following schedule, which is subject to revision. The City reserves the right to modify the schedule as needed.

May 9, 2024 RFQ Released
June 3, 2024 RFI Deadline
June 13, 2024 Proposal/SOQ Deadline
July 9, 2024 Staff Short List Selection
July 23, 2024 City Council Review/Approval
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 3 | Page

SECTION II

SCOPE OF SERVICES/SCOPE OF WORK
The City of Gardena would like the selected firms to provide professional on-call engineering, architecture, and/or landscape architecture services (including Construction Documents, PS&E, technical memoranda, research studies, plan checks, testing, etc.) for City projects to support the Public Works Department. The City intends to select between three and five (3-5) consultants for each respective service category, with the exception of only one or two consultants for Geotechnical Engineering/Geology/Material testing.

However, the actual number of consultants selected may be subject to change based on the number of responses and qualifications.

The award agreements are to provide on-call services for a period of three (3) years. The agreements may be renewed at the City’s discretion for up to two (2) additional years, subject to satisfactory performance during the initial three-year term. The initial three-year term is anticipated to commence in September 2024 and end in September 2027. The City encourages firms to submit qualifications for any or all parts of the key services listed below to be eligible for placement on the qualified on-call/as-needed list for each service category separately.

At the City’s discretion, selected firms will be assigned projects based on their qualifications in relation to the project(s) scope of work, or requested to submit a proposal, on an as-needed basis for various projects in the city. The City does not guarantee that successful firms will be provided with any projects.

MINIMUM QUALIFICATIONS
Only those consultants with verifiable experience related to the services requested in this solicitation will be considered during the evaluation process. Consultant staff assigned to execute the scope of services must have relevant experience in providing the necessary services as described in the scope. All personnel assigned to the work must possess appropriate certification or registration as required by state and local agencies.

SCOPE OF WORK
Selected firms will report to and operate under the direction of the City of Gardena Public Works staff to provide professional engineering, architecture, and/or landscape architecture services to the City. In general, the selected consultants will be expected to provide services and staffing for the following categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation
Consultants may submit qualifications for one or more of the service categories requested; however, separate proposals and letter of transmittals must be submitted for each category.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 4 | Page

GENERAL CIVIL ENGINEERING DESIGN
Provide complete design services for Capital Improvement Program projects. Example services include, but not limited to:
• Plan preparation for street improvements, repair, rehabilitation, or other related street improvements.
• Plan preparation for storm drain and sewer improvements, upgrades, modifications, extensions, repair, or rehabilitation.
• Preparation of hydrology and hydraulic analysis and reports. • Preparation of WQMP’s, SWPPP’s or related NDPES documents/reports. • Geotechnic engineering and material testing as needed. • Preparation of project technical provisions.
• Preparation of detailed cost estimates.
• Perform mapping and prepare legal descriptions for right of way acquisitions, easements, etc. • Provide design and construction surveys.
• Provide construction assistance.
• Coordination with, and approvals from other permitting agencies and utility companies.

CONSTRUCTION MANAGEMENT AND INSPECTION
Provide complete construction management and inspection services for CIP, including park renovations, and facility construction/ modifications/ modernizations. Including, but not limited to:
• Coordinate and lead project construction meetings.
• Lead all meetings during the construction from pre-construction to final closeout. • Provide and maintain project files/documents per City template. • Provide and supervise construction observations/inspections for CIP projects such as streets, sewer, storm drain, parks and facilities.
• Provide construction inspection services in grading, street improvements, drainage, SWPPP/erosion control, paving, sewer, water, and franchise utilities. • Provide public contract administration (i.e. CCO, Daily logs/report, Weekley Statements, Notices, labor compliance/enforcement).
• Provide utility company coordination.
• Provide labor compliance/enforcement as needed.
• Assure contractor to maintain a set of as-built plans. • Schedule the final walk-through inspections and prepare a “punch-list”. • Collect and review the Certified Payrolls as needed.
• Assume contractor to obtain all necessary permits.
• Provide constructability review, quantity take-off and cost estimates as needed.

TRAFFIC ENGINEERING
Provide traffic design engineering and/or study/analysis services for signal and signing, striping, grant writing, and all related services, including but not limited to:
• Improvements associated with traffic signal design.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 5 | Page
• Preparation of signing, striping, signal modifications, detour, and traffic control design • Preparation of special traffic studies
• Conducting signal synchronization studies (before and after synchronization travel time), utilizing HCM method for LOS, as well as Los Angeles County standards.

ARCHITECTURE AND/OR LANDSCAPE ARCHITECTURE
Provide architecture and/or landscape architecture professionally services for public facilities. Including, but not limited to:
• Provide conceptual design, master plan, feasibilities study and envelope evaluations. • Renovation and/or expansion of existing public facilities. • Preparation of landscape/planting plans and irrigation. • Parking lot and hardscapes improvements.
• Playground layout and play structure design/upgrade.
• Preparation of project special provisions and technical specifications • Provide cost estimates.
• Provide constructability review and construction support.

GEOTECHNICAL ENGINEERING, GEOLOGY AND MATERIAL TESTING
Provide complete design, construction, or assistance services for City improvement projects and/or investigations. Services include, but are not limited to:
• Complete soils investigation and preparation of Geotechnical Engineering reports and studies, such as pavement design, grading requirements, retaining wall parameters, slope stability analysis, sinkhole/voids investigation and analysis, etc. • Laboratory work related to all aspects of Geotechnical Engineering. • Provide construction inspection for items such as asphalt concrete, aggregate base, and concrete placement during construction, grading excavation, and backfill. • Provide testing services such as field compaction and laboratory testing of soils, aggregates, asphalt, and concrete.

STAFF AUGMENTATION SERVICES (Firms may submit only for positions or service they provide.) Provide qualified and available personnel to provide professional staff augmentation services and/or backfill various positions and classifications within the Engineering Division on short notice. Positions include but are not limited to: Engineer(s), Permit Technician(s), and Inspector(s) and perform duties as an “Acting” City representative. Positions may require personnel reporting to City offices.

Immediately the City plans to augment one (1) Associate, Civil, or Senior Civil Engineer based on the qualification and best fit for the City. Other categories of augmentation services are not currently needed, however will be requested as needed.

Sample duties include, but not limited to:
• Engineer(s) general requirements (Identify an Engineer with resume and proposed classification; Associate, Civil, or Senior Civil Engineer) - Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 6 | Page
o Able to work minimum 20 hours per week or more. The City is open to accepting fulltime services as well. o Perform mathematical computations and estimates.
o Simultaneously handle several tasks and continue to reestablish priorities. o Communicate clearly and concisely with others, orally and in writing. o Ability to establish and maintain effective team relationships with all internal and external customers.
o Able to operate Microsoft Office and AutoCAD.
o Able to perform in indoor and outdoor environments with exposure to the elements. o May be required to pass a security/background check and a drug test prior before providing any services to the City.
o Must maintain a valid California Drive License.
o You may be required to work more than 40 hours a week and/or work irregular hours, particularly during emergency situations.
o Typical working hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. or 9/80 schedule from 7:30 a.m. to 5:30 p.m.
o Civil and Senior Engineer positions require a California Professional Civil Engineering license.
o May be required to arrange for the City to interview a candidate, at the Consultant’s expense, for a period of up to one (1) hour.

Typical Responsibilities – The staff will be under general direction of Engineering Division Manager, performing and overseeing various CIP projects from preliminary design to final construction. Examples of duties and responsibilities are as follow:
o Prepares RFP/RFQ for design and Construction Management and Inspection (CMI) services.
o Prepares and/or oversees design Plans, Specifications, & Estimates (PS&E). o Prepares and leads project bid processing, writes council agenda report, and executes contract.
o Oversees CMI services.
o Prepares Caltrans required submittals and coordinates review process (i.e. PES, E76 o and Contract award packages).
o Performs minor drafting, computing, and checking field operations as related to the layout and construction of pavement, curbs, gutters, sidewalk, traffic, utilities and other CIP.
o Performs LA Metro required project reporting, reimbursement process, etc. o Interprets and applies GREENBOOK, Caltrans Standards, City Standards, and other laws and regulations relating to CIP projects.
• Provide Permit Technicians to assist public at Engineering public counter (Not required to identify personnel at this time).
• Provide Construction Inspection services (Not required to identify personnel at this time), such as:
o CIP projects such as street rehabilitation; sewer or storm drain improvements, facility modifications and improvements; park rehabilitation and improvements. o Private development including paving, utilities, sewer, storm drains, paving, etc. o Repairs and improvements by private utility companies.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 7 | Page

SECTION III

SUBMITTAL REQUIREMENTS
The Proposal package shall be organized and presented in a neat and logical format relevant to the services requested. Submittals shall be clear, accurate, concise, and comprehensive. There is no page limitation, however, excessive, or irrelevant material will not be favorably received.

The Proposal should be in the order below and include the following:
• Cover
• Cover Letter
o Clearly indicate the on-call service category.
o Express why Consultant is interested in the RFQ.
o Include contact information for the person responsible for the Proposal and who will be the point of contract for the City.
o Include any unique attributes or distinguishing characteristics which would be of value to the City.
o State if any addendums have been received and include in the Proposal. o Statement regarding acceptance of Agreement and insurance requirements. o Letter shall be signed by an officer of the firm who is authorized to bind the firm to the contract. Include a statement to this effect.
• Firm Qualifications and Experience
o Describe firm’s background and experience.
o Describe your firm’s strengths.
o State how your firm produces deliverables free of errors and how you will address erros if they occur.
o Include experience and technical competence of subconsultants. o Familiarity of regional grants/competitive funds (SBCCOG & LA Metro) • Key Personnel and Experience
o Experience and history performing directly for local agencies within the last five years. o Include subconsultants if any.
• Organization Chart
• Similar Projects/Services
o Brief description of the project scope, personnel involved and their roles, plus agency and contact information of agency Project Manager/Engineer. o Projects that the firm was the prime consultant and responsible for management of any subconsultants.
• References
o Current contact information related to projects completed within the last five years. • Fee Schedule
• Resumes
Note: All licensed professionals in 'responsible charge' working on City projects (Engineers, Architects, Landscape Architects, and/or Surveyors) are required to disclose all disciplinary actions against them, including any future actions. Please provide a copy of any disciplinary actions with the proposal submission. Additionally, provide a statement if there are no disciplinary actions.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 8 | Page

SECTION IV

FEE SCHEDULE
A fee schedule should be included in the Proposal. This schedule should comprise a comprehensive list of positions and labor rates for all services provided by the prime consultant and all subconsultants. Rates should cover all necessary resources, including labor, equipment, materials, incidental reports, transportation, etc. Any percentage markup of subconsultant invoices shall be specified.

The fee schedule should remain fixed throughout the initial term of the Agreement unless formally amended by the City Council. Adjustment of the fee schedule can be negotiated if the City renews the Agreement.

The City is subject to prevailing wage laws, which apply to professional service providers and their subconsultants for whom the Department of Industrial Relations has established a wage determination.

This includes, but is not limited to, Field Soils Materials Testers, Operating Engineers, Surveyors, and Building/Construction and Specialty Inspectors.

Prevailing wage requirements apply when a Consultant and/or Consultant Team is awarded a contract for a specific project, which is designated by the issuance of a City Purchase Order.

SECTION V

SELECTION/EVALUATION CRITERIA
The Proposals will be evaluated by City of Gardena Public Works Department staff. The evaluation criteria will include:
• Presentation, completeness, clarity, organization, and conformance to the RFQ content. • Project Manager’s experience related to the City’s requirements and needs. • Familiarity/Experience related to the South Bay Cities Council of Governments (SBCCOG), Los Angeles County Metropolitan Transportation Authority (Metro), and Caltrans project programs, funding opportunities, grant writing, and their requirements. • Qualifications and resumes of staff members, subconsultants, and organization chart. • Similarity of the firm’s referenced projects completed within the last five years to the City’s expected projects.
• Availability and depth of staff and resources to deliver quality products on schedule, including work on short notice and under time constraints.
• References.
• Fee schedule.

During the evaluation period, the City may conduct negotiations with the most qualified consultants.

However, consultants should note that an award may be made without negotiations or discussions.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 9 | Page

SECTION VI

GENERAL CONDITIONS
By submitting a Proposal, the Consultant represents that they have thoroughly examined and become familiar with the requirements of this RFQ and are capable of performing quality work to achieve the objectives of the City.

The City reserves the right to withdraw the RFQ at any time without prior notice. The City makes no representations that any Agreement will be awarded to any Consultant responding to this RFQ. The City reserves the right to extend the deadline for Proposals, postpone reviewing the Proposals for its own convenience, reject any and all Proposals without indicating any reasons for such rejections, and negotiate with any qualified consultant. The City does not guarantee that successful firms will be provided with any projects.

The successful consultant(s) and sub-consultants are required to obtain and maintain a City of Gardena business license and insurance. The license and insurance shall be maintained for the duration of the Agreement. A current business license is not a prerequisite for submittal of the qualifications.

The City is not liable for any costs incurred by the Proposers before entering into a formal agreement.

Costs for developing the Proposal or any other such expenses incurred by the Proposer in responding to this RFQ and entirely the responsibility of the Proposer and shall not be reimbursed by the City.

The City is not responsible for Proposals which are delinquent, lost, incorrectly marked, sent to the wrong address, or sent by mail or courier service and not signed for by the City.

SECTION VII

AGREEMENT AND INSURANCE
The City’s standard Professional Services Agreement is included in Appendix A. The Consultant will be expected to enter into the Agreement without substantive changes. Any changes will require approval by the City Attorney. If there are any exceptions or if there are no exceptions, a statement to the effect shall be included in the proposal as well.

The City’s standard insurance requirements are included as part of the standard Professional Services Agreement included in Appendix A. The consultant shall procure and maintain throughout the duration of this Agreement.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 10 | Page

SECTION VIII
APPENDIX “A”
Gardena Standard Professional Services Agreement
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH XYZ
This Agreement is entered into this day of , 2024,
by and between the City of Gardena, a municipal corporation (“City”) and XYZ, a [state] [type of entity] (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• General Civil Engineering Design
• Construction Management and Inspection
• Traffic Engineering
• Architecture and Landscape Architecture
• Geotechnical Engineering, Geology and Material Testing • Staff Augmentation

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until completion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 2
all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Proposal (RFP), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s proposal or bid to City’s RFP, which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) The Request for Proposal (Exhibit A) (c) The Consultant Proposal or Bid (Exhibit B).

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 3

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee proposal hereto and incorporated herein by reference. In no event shall compensation under this Agreement exceed _____________and 00/00 ($###.##) without the prior written authorization of the City Council.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 4
extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 5
shall be issued by an insurance company which is admitted to do business in the State of California.

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfDocusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 6
insured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 7
the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 8
paid by City for employer contribution and/or employee contributions for PERS benefits.

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 9
Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 10
Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works
To Consultant: XYZ
Address
XXXX, CA #####
Attn: Name
Tittle
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 11
own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 12

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with XYZ Page 13
other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – XYZ
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 2024 City of Gardena RFQ On-Call Professional Services
JUNE 4, 2024

RFQ FOR ON-CALL PROFESSIONAL SERVICES
ADDENDUM 01
TO: ALL RFQ HOLDERS
ADDENDUM NO. 1, AS DESCRIBED BELOW, IS FOR THE USE OF CONSULTANTS SUBMITTING THE STATEMENT OF QUALIFICATIONS OR RESPONSES TO THE CITY’S REQUEST FOR QUALIFICATIONS. ALL

CONSULTANTS SHALL INDICATE ON THE STATEMENT/PROPOSAL COVER LETTER THAT THEY HAVE RECEIVED THIS ADDENDUM NO. 1.

QUESTIONS & RESPONSES:

1. In regard to the subject RFQ Scope of Work for General Civil Engineering Design as shown on page 4, can you please confirm if the City would like us to include Geotechnical services as part of the Civil component as stated, since there is also a separate RFQ category for Geotechnical service on page 5? No, please submit a separate statement of qualifications if your firm is interested in providing services in the category of Geotechnical Engineering, Geology, and Material Testing. This category is intended for direct geotechnical services for the City. For General Civil Engineering Design, it is expected that the lead consultant will team up with your desired geotechnical consultant or your own qualified staff as needed to provide complete PS&E construction documents.

2. Can firms be both a prime consultant and a sub-consultant to another team in the same or different service category?
Yes, firms can be both.

3. Will the City allow the usage of the City’s logo in the proposal materials? Yes, the City will allow the usage of the logo.

4. Can you specify how “Associate, Civil, and Senior Civil” Engineers are classified? Is it based on number of years of experience or other criteria?
You may reference the City of Gardena’s job specifications as your minimum guideline:
https://www.governmentjobs.com/careers/cityofgardena/classspecs. The specifications for the Senior Civil Engineer position have not been developed. Therefore, assume that the job responsibilities are similar to those of a Civil Engineer, but require a minimum of 8 years of experience, including managerial experience. As mentioned, these specifications are minimal guidelines and consultants are encouraged to propose additional qualifications or experience to provide a competitive proposal.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 2024 City of Gardena RFQ On-Call Professional Services

5. Can you please confirm if firms are able to just submit a proposal for the geotechnical engineering/geology and material testing services or require having a team with a construction management company in order to pursue this?
Yes, you may just submit a proposal/statement for the geotechnical/geology and material services.

6. Do you anticipate consultants to support and prepare grant applications? The City may request services under General Civil Engineering, Traffic Engineering, Architecture and/or Landscape Architecture as applicable.

7. You are requesting references in the Similar Projects/Services and the References sections. Can you please clarify what information you would like in each section since both sections are asking for client contact information?
The information can overlap; however, Similar Projects/Services should identify specific projects with scope descriptions, key personnel and their roles, project dates, etc., as mentioned in the RFQ. The Reference Section should identify the current contact agency, person, phone number, and email so the reviewer can perform the reference check if necessary.

END OF ADDENDUM 01
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Exhibit B
Statement of Qualifications (SOQ)
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Response to
Request for Qualifications
ON-CALL PROFESSIONAL SERVICES |

TRAFFIC ENGINEERING
Submitted to:
11477-143.25
June 13, 2024
Electronic Copy
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 June 13, 2024
Mr. Kevin Kwak, Assistant Public Works Director
City of Gardena
Public Works Department
1717 West 162nd Street
Gardena, CA 90247-3778
Re: Proposal For General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture and Landscape Architecture, Geotechnical Engineering/Geology and Material Testing, and Staff Augmentation On‐Call Professional Services:

On-Call Professional Services for: Traffic Engineering
11477-143.25
Dear Mr. Kwak:

With the initiative of the City of Gardena (City) striving to provide welcoming customer service to residents, businesses and industries that choose to establish, relocate, or expand within the City, Iteris, Inc. (Iteris) is committed to assisting with that goal by providing Traffic Engineering services to your community. We specialize in collecting and aggregating actionable data for contextually relevant solutions in traffic engineering, Traffic Signal Systems (TSS), Intelligent Transportation Systems (ITS), and transportation planning. We offer a team of highly experienced engineers, planners, and data analysts with extensive knowledge of traffic management and operations for the City of Gardena. Iteris combines its specialties to design and implement innovative solutions that help government agencies and municipalities reduce traffic congestion, enhance system reliability, improve mobility and safety, and advance the development of thriving communities. Iteris is a leader in smart mobility infrastructure management for the transportation industry.

Iteris proposes Mr. Paul Frislie, PE, IMSA, as Project Manager for this project. He will be the principal contact with the City and other entities per the City’s direction. Mr. Frislie will oversee work from project inception to completion and will also be responsible for coordinating staff activities and meetings. He has directly worked with the City of Gardena for the past fourteen years on numerous high-profile projects that were successfully completed. Iteris will provide the City with the following distinct advantages:

EXPERIENCED PROJECT MANAGER AND PROJECT TEAM
Iteris, with Mr. Frislie serving as project manager, brings extensive traffic engineering and ITS design experience and understanding of the City’s basic ITS functional needs and requirements. Iteris’ depth of project management, technical staff, and proven work approach allows us to deliver projects efficiently, saving the City money and time. The number and depth of staff Iteris has allows us to work on multiple projects simultaneously.

EXTENSIVE ON-CALL EXPERIENCE THROUGHOUT SOUTHERN CALIFORNIA Our team has extensive experience assisting cities in achieving optimized traffic operations, implementing safety measures, assisting with technical analysis to inform decisions, and assisting with system and equipment configurations. We are very well versed in delivering all types of traffic engineering projects, including projects which utilize Federal funds and must be coordinated with Local Assistance. We strive to act as an extension of the City’s staff, allowing quicker results and improved responsiveness for City needs.

ITERIS IS COMMITTED TO THE CITY EVERY STEP OF THE WAY
The Iteris Team has the staff and resources that are readily available to immediately work on the traffic engineering assignments that are of high priority to the City. Our staff are passionate about traffic engineering and will be dedicated to providing exceptional and responsive service to the City. Our workload does not limit us from providing the attention required for each assignment.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Iteris has reviewed the City’s Consultant Agreement and Insurance Requirements and finds them to be acceptable.

Iteris acknowledges receipt of Addendum 01 released June 4, 2024.

Thank you for the opportunity to submit our proposal. Iteris looks forward to assisting the City on this important project. Please contact me at (949) 270-9647 or [email protected], or the designated Project Manager (PM), Mr.

Frislie, at (949) 270-9597 or [email protected], should you have any questions.

Sincerely,
Iteris, Inc.

Steven Bradley, PE
Regional Vice President
Mobility Consulting Solutions
Steven Bradley has authority to negotiate
and bind on behalf of the firm.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | iii

TABLE OF CONTENTS
ITERIS QUALIFICATIONS AND EXPERIENCE....................................................................................................................1 KEY PERSONNEL AND EXPERIENCE................................................................................................................................8 ORGANIZATION CHART................................................................................................................................................10 SIMILAR PROJECTS | SERVICES ....................................................................................................................................11 REFERENCES ................................................................................................................................................................19 FEE SCHEDULE .............................................................................................................................................................20 RESUMES .....................................................................................................................................................................21 Tables
Table 1 – Iteris’ On-Call Experience...............................................................................................................................5 Table 2 – Key Team Members, Role, Location and Skill Experience..............................................................................8 Table 3 – Project Qualifications Matrix .......................................................................................................................11 Table 4 – References ...................................................................................................................................................19 Table 5 – Iteris Standard Fee Schedule .......................................................................................................................20 Figures
Figure 1 – Project Team Organization .........................................................................................................................10 Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 1

ITERIS QUALIFICATIONS AND EXPERIENCE
Iteris, Inc. (Iteris) is the market leader in smart mobility infrastructure management since 1987. With offices across the US, Iteris’ 460 staff have decades of expertise in traffic management, along with superior services and patented products that help detect, measure, and manage traffic and vehicular performance, minimize traffic congestion, enhance safety, and empower Iteris clients with solutions to better manage their transportation networks.

Iteris team members are experts in the
fields of transportation planning, traffic
engineering, and ITS. Knowledge of these
practice areas enables Iteris to provide
comprehensive services ranging from initial
traffic impact studies, transportation
modeling, planning, systems engineering,
and detailed design, through
implementation and performance
measurement/monitoring. Iteris combines
the knowledge of transportation planners,
transportation engineers, systems
engineers, system integrators, and software
engineers to offer an unmatched
combination of talent and experience.

Iteris develops and deploys innovative solutions that help agencies reduce traffic congestion, enhance transit use, monitor, and manage transportation networks and provide greater access to reliable traveler information.

Iteris was founded based on the principle of providing quality solutions on time and within budget. Committed to the transportation industry, Iteris applies in depth knowledge to solve the most challenging problems associated with the movement of people and goods to enhance a growing economy. Iteris delivers precise solutions that meet customer needs and expectations in the following areas:

ITS &
Engineering
Mobility &
Analytics
Data
Insights
Smart
Communities
Connected &
Autonomous
Vehicles
Integration,
Operations &
Maintenance
Advanced
Traveler
Information
Systems
Commercial
Vehicle
Operations
Iteris has extensive, relevant experience in Traffic and Transportation Engineering, and has work with several agencies throughout California. Projects range from planning and design to the implementation of multimodal transportation systems.

Core Disciplines
Services Relevant to this Project
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 2

GRANT OPPORTUNITY IDENTIFICATION AND MANAGEMENT SUPPORT As part of our transportation planning and engineering practice, we have provided grant support service for our clients for over 20 years.  In the past three years we have prepared 20 grant applications for federal BUILD/RAISE, Caltrans HSIP, CALSTA TCEP and TIRCP, FRA CRISI, USDOT MPDG, IDEA4US and SMART, FTA Low or No Emission Bus Program (5339(c) and Bus and Bus Facilities Program and Pilot TOD Program.

Our services include completing all components for some grant applications such as graphics, narrative, analysis, BCA, and BCA memo, whereas on some grant applications, we have provided narrative or BCA components.  Iteris’ grant management support services can also include funding agreement development, preparation of dashboards for grant reporting requirements, and before and after studies of funded improvements. Iteris works with clients to identify grants through eligibility requirements and notices of funding opportunities. Iteris creates an outline of information that needs to be provided to clients while we work on the information and graphics, which is generated independently. Iteris then puts together an initial draft narrative within a few weeks (based on project deadline and need) and then have weekly meetings reviewing edits to the narrative and the status of other application components: letters of support, graphics, additional analysis, and financial information for requested and matching funds. We expect that it is important for City of Gardena to retain all files used to create graphics and tables to easily update those for future funding applications as needed, therefore we will ensure all native files are delivered to the City of Gardena project manager after the final application is submitted.

TRAFFIC ENGINEERING
• Signal System Selection, Design,
Deployment, Operation and
Coordination
• Bicycle Lane Design
• Bulb-outs Design
• Intersection Modifications
• Lighting and Parking Design
• Traffic Simulation
• Pedestrian Crosswalk
Enhancement
• Road Widening/Realignment
• Traffic Circles Planning/Design
• Traffic Control Plans
• Training and Research
• Warrant Studies
Iteris specializes in the design, evaluation, and operation of intersections and arterials to improve the efficiency and safety of vehicular traffic flow, pedestrian mobility, transit operations, and bicycle traffic. Iteris has coauthored the industry standard FHWA Traffic Control Systems Handbook and has assisted multiple agencies throughout the U.S. in the development of signal operation standards.

TRAFFIC SIGNAL DESIGN
• Traffic signal design and
modification
• TSP and EVP
implementation
• Signage and striping
• Detection selection and
implementation
• Signal Performance
Measures (ATSPM)
modifications
• Traffic signal phasing
• Standard development
• Construction Assistance
• Testing and training
As a leader in traffic engineering, Iteris has extensive experience providing planning and design of traffic signals and associated systems to improve safety and efficiency, extend capital investment life, and modify and improve operations, including for transit and emergency vehicles, pedestrians, and bicyclists. Iteris has been an integral part of the design and deployment of thousands of signals nationwide. Our approach stems from a comprehensive understanding of traffic operations, and our engineers strive to provide cost-effective and problem-solving solutions within our signal planning and design.

Iteris has extensive experience in all stages of design development from signal system analysis, evaluation, and master planning to detailed Plans, Specifications, and Estimates (PS&E), hardware selection, and integration of hardware in the field. We utilize our extensive equipment knowledge and experience to help municipalities implement the right solution for their needs.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 3

TRAFFIC SIGNAL TIMING AND SYNCHRONIZATION
• Signal
timing/coordination
analysis
• Inter-jurisdictional and
regional traffic signal
coordination
optimizations
• Traffic signal phasing
• Development of arterial
traffic calming measures
• Transit Signal Priority
(TSP) timing
• Before and after studies
• Area-wide street
network analysis
• Vehicular and pedestrian
safety
• Ongoing Operations and
Maintenance (O&M)
• Construction assistance
• Training
Iteris excels in the assessment of existing traffic signal timing operations to improve the efficiency and safety of vehicular traffic flow, pedestrian mobility, transit operations and bicycle traffic.

Iteris has designed, deployed, or equipped over 1/3 of the signalized intersections in the United States. Iteris continues to innovate in developing advanced solutions to complex problems with traffic operations. Iteris has extensive
experience
successfully
completing
numerous
signal
timing
optimization projects throughout the country.

ON-SITE STAFFING AND OPERATIONS
• TMC Design,
Deployment, and
Software and Hardware
analysis
• TMC Staffing and
Operation
• 24/7/365 Operations
Option
• Operations and
Maintenance (O&M)
Iteris has provided on-site TMC staffing for
the Cities of Pasadena and Santa Monica in
California, as well as remote TMC staffing to
the cities of Westminster, Fountain Valley,
Cypress, Long Beach, and Corona. Iteris also
provides TMC staffing support for the City of
Anaheim during major events such as
professional baseball and hockey events,
large concerts, and conventions, and during
the busy season for the Disney theme parks;
often all four of these events occur on the
same day. In addition to the City of
Anaheim, two cities also have special event
generators and one of Iteris’ key tasks is to
staff the Pasadena TMC during sporting and
concert events held at the Rose Bowl and
for major events in Santa Monica. Iteris has
also been providing on-site TMC staffing of
up to 100 TMC operators statewide to
Virginia DOT (VDOT) for statewide
operations since July 2013. Iteris’ experience
provides additional value in terms of
standard operating procedures (SOPs), and
Iteris’ proven process to hire, employ and
manage staff specifically to staff TMCs at
both the professional level (PE, EIT, college
graduates) and non-professional level (college interns, base TMC operator). Lastly, Iteris has the ability to offer value added services of 24/7 operations.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 4 Iteris operates a 24/7 TMC call center for transportation management in its Richmond, VA, office. Focused on providing public and private operational support for Iteris’ Advanced Traveler Information Systems (ATIS/511) and network monitoring across the entire U.S., Iteris’ team of experts can be made available asneeded by utilizing secure remote network access into any TMC. This capability is supplemented by Iteris’ fully functional TMC located in its Santa Ana, CA office.

ITS PLANNING, DESIGN AND INTEGRATION

PLANNING
• Communications Master Plan
Development
• ITS Master Plan Development
• Traffic Signal System Planning
and Design
DESIGN
• Communication Systems
• Detection and Surveillance
Systems
• Traffic Management Centers
• Information Delivery Systems

INTEGRATION
• Systems Design, Engineering,
Management, Installation,
Integration, Implementation
• Hardware and Software
Development
Planning – ITS embrace complex multimodal surface transportation improvement solutions at regional and local levels, and on corridor or site specific basis. ITS employs various communications networks and technologies that are networked together to exchange information, support coordinated cross-modal applications, and enhance interagency coordination. Careful planning for the deployment of ITS systems requires a comprehensive understanding of local and regional ITS components, their interaction, and their operation. Iteris has completed hundreds of ITS Planning projects, paving the way for ITS systems architecture, design, and deployment. Iteris’ depth of experience working in large and small regions, and with a wide variety of ITS stakeholders, including cities, counties, metropolitan planning organizations, states, regional transit agencies, public safety agencies, emergency management agencies, and the private sector, has allowed the firm to emerge at the forefront of ITS Planning.

Design – Iteris provides agencies with state-of-the-art, cost-effective approaches to the design and implementation of ITS field elements, communications networks, Traffic Management Systems (TMS) and TMCs. Iteris produces comprehensive Plans, Specifications, and Estimates (PS&E) packages for CCTV cameras, Dynamic Message Signs (DMS), detection, TMCs and communications networks. Iteris’ communications designs include numerous corridors and agency-wide ten (10) Gigabit Ethernet networks for traffic management and agency-Wide Area Networks (WAN), not just for traffic signal network but also expanding for other Smart City applications such as city buildings, water facilities, and public security. Iteris has designed communication networks comprised of fiber optics, twisted pair cable, Ethernet radios, and up to 40GB microwave wireless communications. Several of Iteris’ communication network projects have included the procurement, integration, and installation of 100Mb, 1Gb, 10Gb and 4Gb Ethernet hardware, providing agencies with a turnkey solution to implementing a fully robust and resilient Ethernet ITS network. Iteris’ TMC design services include feasibility analysis; functional operations and maintenance requirements; staffing analysis; conceptual layout; and final design. Iteris’ innovative TMC designs incorporate not only the current requirements of the client, but also flexibility to incorporate new technologies and scalability to support future growth.

Integration – Systems integration is a key component of successful multimodal, multi-agency, and complex operating environments. Specialized engineering expertise and skillsets are necessary to overcome all institutional challenges, whether deploying a new system, expanding a legacy system, or aggregating subsystems. Iteris utilizes its extensive experience in complex system engineering, design, product development, systems integration, implementation, system acceptance testing and continued operational maintenance, to integrate all necessary aspects of a complete system including but not limited to hardware, software, and the user-interface into a fully-functional, cost-effective, and turnkey solution. Iteris is committed to providing high-quality products, integrated solutions, and around-the-clock support to meet the client’s needs during the entire lifecycle of the program and keep them up and running well into the future.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 5 Iteris understands customer relationships and what it takes to facilitate agreements among stakeholders, as well as implement and operate multi-jurisdictional or intermodal systems. When it comes to understanding the connection between subsystems, program phasing, interagency communications, and integration, Iteris has the experience to deliver superior results time and again. With backgrounds in systems engineering, in-house testing of all customer hardware/software, object-oriented development, and hardware/software development, Iteris provides integrated solutions which solve current and future transportation challenges before they arise.

Additionally, Iteris develops and documents system requirements as well as performs system acceptance testing to ensure results meet system requirements. Iteris understands its client’s needs and provides cost-effective system solutions to complete the most complex tasks on-time and within budget. At the conclusion of a project, Iteris ensures that the client has a fully-functional system they understand and can utilize for years to come.

ON-CALL SERVICES
• Traffic Engineering
• Transportation Planning
• ITS
• Traffic Signal Design/Synchronization
Iteris has extensive transportation engineering, planning and ITS on-call experience, having successfully managed and completed hundreds of on-call task orders for a wide variety of public agencies and municipalities. Iteris can serve any technical needs and respond quickly to task orders with accelerated schedules without sacrificing quality of work. The blend of Iteris’ local knowledge and vast transportation management experience provides the resources needed to tackle any technical requests that arise. Iteris’ past on-call engagements have involved the evaluation of impacts to traffic, transit and safety as a result of new developments (i.e. residential, retail, commercial), trip/parking generation, traffic control warrants, queuing analysis, travel demand forecasting, capacity analysis/simulation, pedestrian/bicycle/ transit access studies, origin/ destination analysis (using models, license surveys and MacID addresses), circulation analysis and traffic engineering design tasks (e.g. signals, signing, striping, lighting, temporary traffic control, ITS, ETC.). Table 1 provides a selection of agencies to which Iteris has provided on-call services over the past five years.

Table 1 – Iteris’ On-Call Experience

CITY/AGENCY
Traffic
Engineering
Transportation
Planning ITS
Caltrans, District 12  
City of Anaheim   
City of Chula Vista  
City of Corona   
City of Cypress  
City of Diamond Bar   
City of Fountain Valley  
City of Gardena   
City of Garden Grove  
City of Irvine   
City of Irwindale   
City of Laguna Niguel   
City of Laguna Woods   
City of Lancaster  
City of Long Beach  
City of Newport Beach  
City of Oxnard   
City of Rancho Palos Verdes  
City of Santa Ana  
City of Seal Beach   
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 6

CITY/AGENCY
Traffic
Engineering
Transportation
Planning ITS
City of Simi Valley  
City of South San Francisco  
City of Union City 
City of Ventura   
City of West Hollywood  
Los Angeles County, LADPW   
Los Angeles County Metro   
Port of Long Beach   
Port of Los Angeles 
San Diego Association of Governments 
San Mateo County / CCAG  
Ventura County Transportation Commission   

QUALITY ASSURANCE/QUALITY CONTROL (QA/QC)
Iteris’ ability to implement high-quality deliverables is a result of the firm’s adherence to an official quality assurance program that ensures accuracy, product usability, and an overall commitment to product excellence and client satisfaction. Our Project Manager will ensure the team’s commitment to these objectives by identifying goals at the outset of the project and monitoring the product implementation and delivery process.

The QC/QA process is a major factor in reducing project issues and technical errors and will assist with identifying conflicts or inconsistencies within project documentation. The QC/QA process will also require that each project be set up with a dedicated task for QC/QA tracking and that an individual be charged with Quality Control for each task in the work plan. In addition to the project budget, ample time must be provided in the project schedule to complete reviews, as well as provide sufficient time for comments to be addressed and incorporated into the final delivery to the City. The production of top-quality products for the City is Iteris’ number one project goal, and the QC process is followed by all associates working on each project undertaken by Iteris. As a firm and as individuals, Iteris strives for excellence.

All documents produced by Iteris associates and team members, prior to transmittal to the City, are reviewed by a member of our technical staff with expertise in the relevant area other than the author to ensure that they are comprehensive and well written. It is difficult for the author of a product to always catch some obvious mistakes or to realize when something may not be very clear to the reader. A second opinion is also invaluable in identifying alternative approaches to the analysis.

It is Iteris’ policy that all documents must be reviewed by senior staff before distribution, and that this person should be identified early in the process. During the internal project kick-off meeting, once the deliverables are identified, the PM for each task shall identify specific senior staff who are able and qualified to perform the reviews. At each level of document review, the author shall review their own work relative to the underlying analysis, calculations, and graphics of the report.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FIRM QUALFICIATIONS AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 7

FAMILIARITY OF REGIONAL GRANTS/COMPETITIVE FUNDS
(SBCCOG & LA METRO)
Iteris staff are prepared to assist the City in the advanced preparation for, pursuit of, and management of a variety of County, State, and Federal grants. With extensive experience supplementing City transportation engineering staff throughout Southern California, Iteris staff are well versed in the level of effort required to successfully pursue, win, and execute grant-funded projects. Iteris staff typically apply the understanding gained via on-site staffing to help Cities identify unfunded needs in relation to transportation safety. Iteris staff then apply that understanding to develop detailed performance assessments which can be used as the foundation for successful grant applications.

We work with our clients to identify grants through eligibility requirements and notices of funding opportunities.

We create an outline of information needs to provide to our clients while we work on the information and graphics, which we can generate independently. We put together an initial draft narrative within two weeks and have weekly meetings reviewing edits to the narrative and the status of other application components: letters of support, graphics, additional analysis, and financial information for requested and matching funds.

We often utilize previously completed analysis and graphics since reference to previous planning efforts demonstrates continuity and commitment to a project. However, for nearly every application we create new graphics whether they be infographics or maps that are specific to the eligibility or evaluation criteria of the funding program.

Grant applications are generally completed on short deadlines, therefore management of submittal timeline is based on working backwards from a “pens down” date of the Friday before an application deadline to reduce the risk of logistical issues on the day of submission.

Iteris staff assisted the SBCCOG in setting up the Measure R Highway Program in the period before management was transitioned to SBCCOG staff. As part of our management contract, we set up the project lists, funding agreements with Metro, project mapping, and interfaced with each member agency to keep project development on track.

Since 2022, Iteris staff authored the successful West Santa Ana Branch Transit Oriented Communities and Downtown Los Angeles Transit Oriented Communities awarded grants (Federal Transit Administration), the Zero Emission Busses and Charging Infrastructure Deployment and System Integration under the CalSTA Transit and Intercity Rail Capital Program, and the La Brea Avenue Complete Streets Project under the Safe Streets for All Program, and the Port of Long Beach North Harbor Transportation System Improvements MARAD Port Infrastructure Development Grant totaling $241 million in awards.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 KEY PERSONNEL AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 8

KEY PERSONNEL AND EXPERIENCE
PAUL FRISLIE, PE, IMSA | PROJECT MANAGER
Mr. Paul Frislie, PE, IMSA, will serve as the Project Manager for this on-call and will be the principal contact with the City and other entities per the City’s direction. Mr. Frislie will be responsible for coordinating staff activities, coordinating meetings, project strategy, and will oversee work from project inception to completion. For over 23 years, Mr. Frislie has been involved in several transportation and traffic engineering projects that include both planning as well as design and deployment of ITS, systems integration, and traffic signal design. Recently, he has served as the Project Manager for the Artesia Blvd Arterial Improvement Project and the Redondo Beach Blvd Arterial Improvement Project in the City of Gardena, the City of Long Beach Mid-City Signal Coordination Project, the Euclid Street Regional Traffic Signal Synchronization project, and the Yorba Linda Boulevard Regional Signal Synchronization Project. Mr. Frislie’ s ITS experience comprises fiber optic communications, wireless communications, Closed-Circuit Television (CCTV), Video-Detection System (VDS) and Dynamic Message Signs (DMS) including the development of numerous ITS Master Plans for the Cities of Gardena, Newport Beach, Cypress, Ventura, Buena Park, Oxnard, and Whittier. Along with his ITS experience, Mr. Frislie has extensive experience in the field during construction conducting inspections, daily reports, quantity takeoffs, and project final acceptance and close-out punch lists.

Project Experience:
 Redondo Beach Blvd and Artesia Blvd Arterial Improvement Projects – City of Gardena, CA  Euclid Street Corridor Project Regional Traffic Signal Synchronization Program (RTSSP) – City of La Habra, CA  Plans, Specifications, and Estimates (PS&E) for the I-10 Corridor Freight and Express Lane Project (Contract 2), San Bernardino County Transportation Authority (SBCTA) – San Bernardino County, CA  Tweedy Boulevard Signal Synchronization Project – City of South Gate, CA  I-405 Design-Build Improvement Project, Orange County Transportation Authority (OCTA) – Orange County, CA  Citywide Traffic Signal Design & Inventory – City of Manhattan Beach, CA Table 2 – Key Team Members, Role, Location and Skill Experience

STAFF ROLE LOCATION AVAILABILITY
EXPERTISE OF KEY INDIVIDUALS Traffic Engineering Transportation Planning ITS Traffic Signal Design/ Synchronization Paul Frislie, PE, IMSA Project Manager Santa Ana, CA 50%    Bernard K. Li, EE, TE,
PTOE QA/QC Santa Ana, CA 25%    
Andrew Freeman, PE,
PTOE Project Engineer Santa Ana, CA 40%   
Deepak Kaushik, PE Project Planner Los Angeles, CA 25%   Jason Xu, PE, PTOE,
PMP Project Engineer Santa Ana, CA 45%   
Education & Registrations
BS, Civil Engineering
PE, CA #72982
IMSA Traffic Signal Level I &
II, Signal Inspector Level I,
Work Zone Safety
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 KEY PERSONNEL AND EXPERIENCE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 9

STAFF ROLE LOCATION AVAILABILITY
EXPERTISE OF KEY INDIVIDUALS Traffic Engineering Transportation Planning ITS Traffic Signal Design/ Synchronization Rasool Andalibian,
PHD Project Engineer Santa Ana, CA 40%   
Ted Huynh, PE, TE Project Planner Santa Ana, CA 40%   SungWoo Jo, TE Project Planner Los Angeles, CA 50%  
Chris Devlin Project Planner Santa Ana, CA 60%  
Evan Shipley, EIT Project Engineer Santa Ana, CA 60%    Delbert SmithLavezzari Project Engineer Santa Ana, CA 40%   Ciera Fernandez, EIT Project Engineer Santa Ana, CA 50%    Raymond Liang, EIT Project Engineer Santa Ana, CA 50%    Alex Ingoglia Project Engineer Santa Ana, CA 40%   
Richard Luo, EIT Project Engineer Santa Ana, CA 50%    Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 ORGANIZATION CHART | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 10

ORGANIZATION CHART
With local offices in Santa Ana, Los Angeles, and Oakland, Iteris has the resources of over 100 team members throughout California dedicated to Traffic Engineering, Transportation Planning, and ITS. Iteris’ proposed team organization is provided in Figure 1.

Figure 1 – Project Team Organization
KEY
 Task Lead

PAUL FRISLIE, PE, IMSA
Project Manager

BERNARD LI, EE, TE, PTOE
QA/QC

TRAFFIC

ENGINEERING

TRANSPORTATION

PLANNING OPERATIONS
Andrew Freeman, PE, PTOE  Deepak Kaushik, PE  Jason Xu, PE, PTOE, PMP  Evan Shipley, EIT
Delbert Smith- Lavezzari
Ciera Fernandez, EIT
Raymond Liang, EIT
Ted Huynh, PE, TE
Chris Devlin
SungWoo Jo, TE
Alex Ingoglia
Rasool Andalibian, PHD
Richard Luo, EIT
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS|SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 11 SIMILAR PROJECTS | SERVICES
Iteris is well known within the industry and has a long history of successful projects similar in scope for several California agencies. With a proven track record of on-time, within-budget performance, Iteris encourages the City to verify with the references provided for the project qualifications provided. Iteris has initiated over 1,000 ITS/Engineering and Planning projects within the last five years for a wide range of public and private entities including local agencies, counties, MPO, and Caltrans.

Approximately 70% of these projects represent repeat clients - a testament to Iteris’ ultimate goal of client satisfaction.

Iteris’ extensive traffic engineering, transportation planning and ITS experience is demonstrated by the projects are summarized in Table 3.

Table 3 – Project Qualifications Matrix

PROJECT NAME AND LOCATION
Traffic EngineeringTransportationPlanningITSTraffic Signal Operations Artesia Blvd. Arterial Improvements from Western Ave to Vermont Ave – Gardena, CA
   
Hawk Signal System at Vermont Ave and 133rd Street - Gardena, CA     ITS Master Plan – Gardena, CA  
On-Call Professional Engineering Services for Traffic/Transportation Engineering – Newport Beach, CA
  
On-Call Engineering and Professional Consulting Services, Category K:

Traffic Engineering – Corona, CA
   
On-Call Professional Consulting Services – Seal Beach, CA     MacArthur Boulevard Regional Traffic Signal Synchronization Program (RTSSP) Project – Irvine and Newport Beach, CA
  
Katella Avenue Regional Traffic Signal Synchronization Projects (RTSSP), Orange County Transportation Authority (OCTA) – Orange County, CA   
Warner Avenue Traffic Signal Synchronization Project (TSSP) – OCTA, Orange County, CA
  
On-Call Traffic Engineering and Planning Services – Port of Long Beach (POLB), CA  
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 12 Artesia Blvd. Arterial
Improvements from Western
Ave to Vermont Ave –
Gardena, CA (2019 –
Ongoing)
Iteris was the project traffic engineer on a consultant team that provided preliminary engineering, design,
signal timing, and construction management of
Artesia Boulevard Avenue from Western Avenue to
Vermont Avenue in the City of Gardena. Artesia
Boulevard is a major arterial located in the City and
is a major corridor to gain access to the 110
Freeway. The goal of the project was to prepare the
PS&E and provide the Construction Management/
Inspection Services to improve Artesia Boulevard.

The project was funded by the Los Angeles County
Measure R Highway Program. The project was
divided into three phases. For the initial preliminary
engineering phase, the team performed detailed
field investigation of the entire corridor to identify
deficiencies and recommended improvements to
enhance safety and traffic flow along the corridor
including median improvements. Topographic
survey, traffic signal, signing, and striping inventory were conducted as part of the field investigation.

Upon City’s approval of the Preliminary Design
Report (PDR), the team prepared full PS&E package
during the design phase, which includes new
landscaped median, ADA ramps enhancement,
traffic signal upgrades, signing and striping
modifications for the entire corridor.

Hawk Signal System at
Vermont Ave and 133rd
Street - Gardena, CA (2020 –
2022)
Iteris provided design, signal timing, and
construction support of the Vermont Avenue and
133rd Street HAWK Signal Installation Project in the
City of Gardena. The project provided improvements
to the intersection by upgrading the ADA ramps,
median sidewalk, and providing signing and striping
upgrades. Iteris was responsible for designing the
new HAWK traffic signal which included traffic signal
poles, conduit and pull boxes, signal cabinet, and
service enclosure. Iteris coordinated with Southern
California Edison to establish the service point. Iteris also coordinated with the City of Los Angeles
Department of Transportation for the A-Permit
application, review of the signal plans, and
acceptance of the ADA ramp design within their
right-of-way. The design phase has been completed,
and the team will support the Construction Phase of
the project.

ITS Master Plan – Gardena,
CA (2023 – Ongoing)
The City of Gardena contracted with Iteris for the
development of the initiated the Citywide ITS Master
Plan to document the existing communication
system and traffic signal elements such as cabinets,
controllers, battery backup, etc. within the City. This Master Plan evaluated potential future
transportation options within the City and
developed a multi‐step process for implementation
of upgrades to the existing traffic signal/ITS system
including fiber optic communication, redundant
Ethernet network, and CCTV cameras. These
upgrades included anticipated software, hardware,
and operational improvements designed to ensure
that the City is well positioned for the future. In
addition to physical improvements the Master Plan
document will identify Operations and Maintenance
(O&M) staffing responsibilities required to support
the proposed traffic signal and ITS equipment to be
deployed.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 13 On-Call Professional
Engineering Services for
Traffic/Transportation
Engineering – Newport Beach,
CA (2003 – Ongoing)
Iteris has been providing on-call engineering services
to the City of Newport Beach since 2003. In general,
the work performed under this on-call includes
development of plans, specifications, and estimates
for traffic/transportation engineering projects,
traffic-related studies, signal timing and
coordination, conceptual designs, cost estimating
and value engineering, transportation impact
studies, traffic calming studies, traffic control plans, record drawings, traffic signal system monitoring,
operations, and maintenance, compliance review,
and grant applications. During this period, Iteris has
provided an array of services through multiple task
orders under the on-call contracts.

A highlight of these services include:
• West Balboa Blvd Fiber Optic Upgrade Project –
Iteris provided ITS design services to install fiber
optic cable along Balboa Blvd between River
Avenue and 32nd Street. This project will allow
for a direct fiber connection between the signals
on the Peninsula and City Facilities back to the
Traffic Management Center in City Hall. The
project used an existing conduit along the
corridor and replaced the existing wireless
radio.
• Balboa Blvd Traffic Signal Rehabilitation Project
- Iteris provided traffic engineering and ITS
design services for the Balboa Blvd Rehab
Project. The project consisted of modifications
to three traffic signals along Balboa Blvd at 22nd
St, 21st, and Main St, fiber optic design between
Palm St and Main St, a Changeable Message Sign
at 29th Street, and two overhead sign bridge
designs.
• Balboa Blvd Crosswalk Enhancement Project –
Iteris provided traffic engineering design service
to upgrade two existing pedestrian beacon
signals at 13th St and 14th St. The design
consisted of replacing the existing poles with
LED signage, corner bulbouts for new mast arm
poles, controller cabinet in median with
override switch, and conductors in conduit for
hardwired service.
• Newport Center Drive Fiber Optic Upgrades –
Iteris provided ITS design services for the
installation of fiber optic cable along Newport
Center Drive in the Fashion Center Mall area.

The fiber optic cable replaced the existing
twisted pair cable along with upgrading the
existing Ethernet switches. The project
upgraded nine traffic signals to fiber optic
communication.
• 28th Street Improvements Project – Iteris
provided design, signal timing, and construction
management for this project which added
pedestrian bulb-outs, a new Fire station, and onstreet parking on 28th Street. Iteris provided the traffic engineering which included signal
upgrades, street lighting modifications, an RRFB
relocation, changeable message sign
installation, and improved signal timing.
• Balboa Peninsula Parking Management Plan –
Iteris developed a parking management plan to
assist the City with managing season tourism in
the Balboa Peninsula. This work included
development of recommendations for
improvement and several public workshops to
solicit community input. Iteris reviewed all
existing parking and policies and made
prioritized recommendations for improvements
which the City is currently implementing.
• Bayside Drive Improvements – Iteris was
responsible for the signal modification design at
the intersection of Bayside Drive and Jamboree
Road/Marine Avenue which included pedestrian
signal modification, street lighting, and loop
detection replacement. Iteris also provided
construction management and support for this
project.
• Pedestrian Signals & Rectangular Rapid
Flashing Beacons (RRFB) – Iteris prepared
design documents for two RRFB intersections:

East Bluff Drive at the High School Driveway and
Via Lido at Via Oporto. The design implemented
wireless and solar RRFBs, including solar
powered safety lighting. The design included
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 14 lighting analysis, signage and striping, and ADA
curb ramp upgrades.
• Traffic Flow Optimization Project – Iteris
developed citywide optimized signal timing
plans at the City’s 92 signalized intersections.

Work also included coordination with 33
Caltrans-owned intersections. Work also
included identification of low to medium cost
improvements at some of the City’s worst
operating intersections, as well as identification
of advanced technologies to monitor and
manage traffic more efficiently.
• Traffic System Master Plans, Phases 1-8
Projects – Iteris prepared the City’s traffic
system master plan which laid out the City’s
plan for implementing communications
improvements, ITS improvements, and general
traffic signal equipment improvements citywide.

Iteris followed up with the City to deliver
designs for all eight phases outlined in the
master plan, assisting the City in realizing the
goals developed in the master plan. Work also
included the development of Citywide traffic
signal coordination. Iteris supported the
implementation of all design and
synchronization work from the City’s TMC and
also trained City of Newport Beach staff on the
management of their new systems and timing.

On-Call Engineering and
Professional Consulting
Services, Category K: Traffic
Engineering – Corona, CA
(2019 – Ongoing)
Iteris has been providing on-call engineering services
to the City of Corona since 2019. In general, the
work performed under this on-call included the
preparation of traffic control plans, specifications,
and bid documents, traffic studies and analysis,
signal timing and optimization, ITS design, signage
and striping design, traffic impact studies, and
serving as City representative as needed. During this
period, Iteris has provided an array of services
through multiple task orders under the on-call
contracts.

A highlight of these services include:
• Georgetown and Bedford Signal Installation
Project – Iteris provided design, signal timing,
and construction support for the project which
improved the intersection at Georgetown and
Bedford. Iteris was responsible for the design of
the new traffic signal, video detection, street
lighting, rewiring, flashing yellow arrow
operation, new fiber optic communications, and
improved signal timing. The work also included
upgrading ADA curb ramps, median porkchops,
and providing signage and striping updates.

Iteris supported both the design and
construction phases of this project.
• Various On-Call Traffic Studies and
Transportation Analysis Services - Iteris
performed several traffic engineering, modeling
and analysis tasks for the City of Corona since
the completion of the General Plan Update.

These projects consisted of the analysis of
various roadways using the City's travel demand
model. Specifically, the work included:
• Analysis of changes in traffic on Foothill
Parkway with different roadway
connections to Foothill
• Analysis of the impacts on traffic flow of
turn restrictions at various locations within
the City
• Analysis of changes to the ramp
configurations at SR91/Promenade Avenue
interchange
• Analysis of changes to ramp configurations
at various interchanges due to the
implementation of the Mid-County Corridor
• Preparation of model build-out volumes at
different locations in the City; these are
used for traffic studies for proposed
development projects
• Duncan Gate Traffic Study – Iteris prepared a
neighborhood traffic study to evaluate the
impacts of a gate removal to interconnect
adjacent neighborhoods on Duncan Way. Iteris
performed LOS analysis at six intersections to
assess the impacts, including considering
potential cut-through traffic if the changes are
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 15 made. Iteris ultimately made recommendations
for traffic calming measures to reduce speed
and discourage commuter cut-through. Iteris
presented the recommendations to the City
Council for consideration.
• Retrofit of Current Dynamic Message Sign
(DMS) Technology – Iteris provided ITS design
services to retrofit and upgrade the eight (8)
existing dynamic message signs at five (5)
locations throughout the City. Iteris provided
specs for different sign vendors, pole
modification details, sign mounting details, and
sign installation plans including wiring,
communication, and power.
• Traffic Management Center Video Wall
Upgrade – Iteris assisted the City in the design
development and installation to upgrade the
City’s existing TMC video wall. This project
provided the city with a complete demolition of
the existing BARCO cube wall video wall system
and recycling of aluminum wall structure –
installed 15+ years ago. Replacing it with a new
4x2 55” LCD video wall replacement. Iteris
assisted City staff in closing the existing wall
opening for new video wall installation.

On-Call Professional
Consulting Services – Seal
Beach, CA
(2019-Ongoing)
Iteris has been providing on-call engineering services
to the City of Seal Beach since 2019. In general, the
work performed under this on-call includes review of
traffic control plans and traffic signal improvements.

Other services include development of plans,
specifications, and estimates for
traffic/transportation engineering projects, trafficrelated studies, signal timing and coordination, conceptual designs, cost estimating and value
engineering, transportation impact studies, traffic
control plans, record drawings, traffic signal system
monitoring, operations, and maintenance,
compliance review, and grant applications. During
this period, Iteris provided many services through
multiple task orders under the on-call contracts.

A highlight of these services include:
• Special Event Traffic Control Plan Review - In
coordination with special event coordinators,
Iteris provided traffic control plan review for
special events in the City. Iteris reviewed
additional traffic control plans developed by
others for annual events.
• Local Signal Synchronization Plan – Iteris
provided traffic signal recommendations to be
included in the Plan which serves as a basis for
the City’s grant application effort.

Improvements were based off our knowledge of
the City’s infrastructure and the City’s goals to
improve operations and safety citywide. The
LSSP document was used to make the City
eligible for future traffic signal synchronization
funding.
• Traffic Signal Recommendations and Design –
Iteris has provided traffic signal
recommendations and design PS&E for various
signal improvements around the City. The
projects included new traffic signal cabinets,
deployment of battery backup systems (BBS),
new traffic signal controllers, and improved
detection. The Design also included new ADA
pedestrian ramps at locations that were not
currently compliant. The traffic signal
improvements placed the City in a better
position for improved traffic signal maintenance
and future communication upgrades.
• City Traffic Guideline Updates – Iteris assisted
the City with the development and update of its
various traffic engineering policies and
guidelines. As a result of Senate Bill 743, Iteris
assisted the City with the update of the City’s
traffic impact study guidelines to maintain
compliance with the new regulations. A new
stop sign request guide was also produced for
the City in accordance with the California
Vehicle Code and (CVC) California Manual on
Uniform Traffic Control Devices (CAMUTCD).
• Stop Sign Policy – Iteris staff developed a stop
sign policy for the City of Seal Beach that is
consistent with the CAMUTCD, CVC, and City’s
Municipal code. The policy is used to help field
numerous requests for stop signs.
• System Integration and Support – Iteris
provided system integration services to assist
the City with installing GPS clocks at
intersections along Westminster Blvd. These
improvements allowed the City to keep their
traffic signals along Westminster in step with
the OCTA Westminster TSSP project.
• Fiber Communication upgrades projects – Iteris
has coordinated with the City to prioritize traffic
signal communication upgrades. Iteris provided
fiber installation PS&E for traffic signals along
Lampson Avenue and on Ocean Avenue to
connect traffic signals and City IT services.
• Transportation Conceptual Planning – Iteris
provided conceptual drawings for new lane
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 16 configurations at several locations throughout
the City. A concept plan was provided to the City
for a new WB right turn only lane at
Westminster Boulevard and Seal Beach
Boulevard. Iteris also provided signing and
striping recommendations for the intersection
of 1st Street and Marina Drive.
• Seal Beach Boulevard Traffic Signal
Synchronization Review – Iteris reviewed traffic
signal synchronization design plans and timing
operations recommendations. The project
upgraded traffic signal detection and signal
communication equipment. New signal timing
parameters were evaluated to ensure they were
consistent with CAMUTCD requirements.

MacArthur Boulevard Regional
Traffic Signal Synchronization
Program (RTSSP) Project –
Irvine and Newport Beach, CA
(2020 – 2021; O&M 2021 –
2023)
This project involved signal synchronization and
equipment upgrades along MacArthur Boulevard
from Pacific Coast Highway (PCH) and State Route 55
(SR-55) ramps, spanning across the Cities of Irvine
and Newport Beach. The project was funded by
Measure M2 funds, with the City of Irvine serving as
the lead agency. The corridor spans 7.2 miles
totaling 22 traffic signals. Iteris’ goal of the project is to provide updated clearance parameters for the
safety of vehicles, pedestrians, and bicyclists
accompanied with new coordinated plans that will
provide progression improvement along MacArthur
Boulevard corridor without significantly increasing
delays on the side streets.

General goals and tasks to be completed for both
agencies include:
• Improving traffic flow along MacArthur and
surrounding areas
• Cross coordination with major arterials
accomplishes better regional traffic flow
• Identify design issues early to prevent change
orders. With Iteris SPM, this will help improve
the O&M period to ensure any operational
changes and degradations are identified right
away
• ClearGuide® will be used to provide corridor
level insights from GPS probe data collected in
real-time, every minute
Per the requirements of the M2 guidelines, Iteris will
also provide Operations & Maintenance support for
2 years.

Katella Avenue Regional
Traffic Signal Synchronization
Projects (RTSSP), Orange
County Transportation
Authority (OCTA) – Orange
County, CA
(2019-2023)
Iteris was selected by OCTA for a $4.7 million
regional traffic signal synchronization project along
approximately 20 miles of the Katella Avenue
corridor extending through the Cities of Anaheim,
Cypress, Garden Grove, Los Alamitos, Orange,
Stanton, Villa Park and the County of Orange
jurisdictions in Orange County, California. The threeyear project includes signal coordination and timing improvements, with the aim of improving traffic
flow, enhancing public safety, and decreasing stops.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 17 Under the project agreement, Iteris will provide
services that will upgrade traffic signal electronics
and communications equipment and optimize signal
timing along Katella Avenue / Villa Park Road /
Santiago Canyon Road, a major east-west corridor
that comprises 73 major signalized intersections.

As part of the project, Iteris’ Intersection-as-aService™ end-to-end solution offering will deliver proactive monitoring of traffic signal operations at
all project intersections. The primary goal of this
project is to deploy new Intelligent Transportation
System (ITS) equipment and communication
infrastructure to support the management of the
cities’ transportation network, implement optimized
coordination timing plans to achieve optimal traffic
flow, and improve safety for all road users, including
vehicles, buses, bicycles, and pedestrians.

Iteris is proud to support OCTA’s goal of improving
the safety and mobility of road users by embarking
on this traffic signal synchronization project. This
initiative will ultimately help increase the value and
effectiveness of the region’s existing transportation
infrastructure, while improving air quality and
reducing fuel consumption.

Main Street Regional Traffic
Signal Synchronization
Projects (RTSSP), Orange
County Transportation
Authority (OCTA) – Orange
County, CA (2019-2023)
Iteris was selected by OCTA for a $3.6 million
regional traffic signal synchronization project along
12 miles of the Main Street corridor extending
through the Cities of Orange, Santa Ana, and Irvine
in Orange County, California.

The three-year project includes signal coordination
and timing improvements, with the aim of improving
traffic flow, enhancing public safety, and decreasing
stops. Under the project agreement, Iteris will
provide services that will upgrade traffic signal
electronics and communications equipment, and
optimize signal timing along Main Street, a major
north-south corridor that comprises 67 major
signalized intersections.

Warner Avenue Traffic Signal
Synchronization Project
(OCTA) – Orange County, CA
(2012 – 20215, 2022 -
Ongoing) Iteris was selected by OCTA twice (2012 to 2015 and 2022 to present) to provide ITS upgrade
design/construction and traffic signal
synchronization improvements along Warner
Avenue, a major east-west arterial, from Pacific
Coast Highway to Pullman Avenue. The corridor
encompasses a total of 43 signs, covering 13 miles of
roadway, crossing the Cities of Huntington Beach,
Fountain Valley, and Santa Ana. The first project,
which started in 2012, was funded by the Renewed
Measure M (aka M2), while the second project,
started in 2022 with a value of $4.4 million, was
funded by both M2 and Senate Bill 1 (SB1). For both
projects, numerous ITS equipment upgrades were
provided, including fiber-optic communications,
Closed-Circuit Television (CCTV), video detection
systems (VDS), signal controllers, and cabinets. The
current project also includes the implementation of
ClearGuide® arterial performance measure (APM)
and signal performance measure (SPM).

The signal timing effort for the first project included developing signal synchronization plans for all 43
intersections along the corridor during weekday AM
and Peak peaks. It began in August 2012 with new
coordination timing implemented in June 2015 that
resulted in a B/C ratio of 14:1. Operations and
Maintenance (O&M) was provided through May
2015. The second project required developing signal
synchronization plans for all 43 signals during
weekday AM, midday, PM, and Weekend peaks. It
started in January 2022 with new coordination
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 SIMILAR PROJECTS/SERVICES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 18 timing implemented in November 2023 that resulted
in a B/C ratio of 19:1. The primary implementation
(PI) phase will be completed by February 2024
followed by Operation and Maintenance (O&M)
support from March 2024 to February 2026.

On-Call Traffic Engineering
and Planning Services – Port
of Long Beach (POLB)
(10/2013-Ongoing)
Iteris serves as an On-call Traffic Engineering and
Planning Consultant to the Port of Long Beach
(POLB). Projects and services include:

Plan Checking and Approval Services for Traffic
Control Plan
• Traffic Operational Study and Traffic Control
Plans for Harbor Scenic Dr.
• Traffic Signal Design at the Intersection of Pico
Ave/Pier G Ave and Harbor Plaza/Pier F Ave
(17J1217B5)
• POLB On-Call Modeling, Traffic Engineering &
Transportation Planning
On-Call Plan Checking & Approval Services for
Traffic Control Plans
Iteris is serving as a consultant to POLB in support of this on-call traffic engineering project that provides
traffic engineering design services to include Plan
Checking and Approval Services for Traffic Control
Plans. Iteris provides technical reviews of the plans
for conformance to Port’s guidelines and state
standards. Iteris has so far reviewed over 150 sheets
of Traffic Control Plans in the vicinity of POLB.

Traffic Operational Study & Traffic Control Plans
for Harbor Scenic Dr
Iteris, as an on-call traffic engineering consultant to POLB, provides traffic engineering services to review
traffic operations for Harbor Scenic Drive from
Harbor Plaza to Pier J Avenue South End and provide
recommendations to improve safety and traffic
operations within the project area. Iteris conducted
field reviews, assessed the issues, and has suggested
possible solutions for consideration. In general,
more than one recommendation was made at some
of the critical locations identified along the corridor.

All the recommendations have been discussed and
presented to POLB to enhance the corridor safety,
and traffic operation efficiency.

Traffic Signal Design at the Intersection of Pico
Ave/Pier G Ave and Harbor Plaza/Pier F Ave
Iteris is serving as a consultant to the POLB to
provide traffic engineering services for Traffic Signal Design at the Intersection of Pico Ave/Pier G Ave and
Harbor Plaza/Pier F Ave. The main objectives of this
project are to propose new signal phasing, design
the new traffic signal including upgrading the ADA
ramps, prepare Plan, Specifications and Cost
Estimates (PS&E), and pothole proposed traffic
signal pole locations. Upon approval from POLB and
the City of Long Beach, Iteris will provide bid and
construction support during the construction of the
signal.

On-Call Modeling, Traffic Engineering &
Transportation Planning
Iteris has been retained by both the POLB and Port
of Los Angeles (POLA) to conduct a wide range of oncall travel demand modeling, traffic engineering and transportation planning services. The projects range
from Port area travel demand model development
and implementation, model application for port
studies, and large-scale transportation planning and
design efforts to local traffic and access studies for
Port related developments. The projects supported
by Iteris in the Port area include support documents
for environmental reports, development of traffic
mitigation plans, traffic signal design and operations
analysis, and public presentations and community
workshops. Iteris was integral in the early
development of the first Port area travel demand
models and our staff continue to support the Ports
in model updates and applications for many
projects. Projects recently completed in the Ports
include EIR traffic studies for the Gerald Desmond
Bridge, the ICTF and SCIG near-dock rail projects,
several port terminal projects, signal coordinate and
street design. Iteris has also recently developed and
implemented a VISSIM computer micro-simulation
model for the port area along a critical stretch of
Ocean Blvd near the Gerald Desmond Bridge.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 REFERENCES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 19

REFERENCES
Iteris has provided the following client references as shown in Table 4 Table 4 – References
Brad Sommers, Principal Civil Engineer
City of Newport Beach
100 Civic Center Drive
Newport Beach, CA 92660
949-644-3326 | [email protected]
Juan Navarro, Associate Engineer
City of Garden Grove
11222 Acacia Parkway
Garden Grove, CA 92840
714-741-5186 | [email protected]
Rosalva Ureno, City Traffic Engineer
City of Corona
400 S. Vicentia Ave.

Corona, CA 92882
951-817-5708 | [email protected]
Tony Wang, Traffic Engineering Manager
City of Yorba Linda
4845 Casa Loma Avenue
Yorba Linda, CA 92886
714-961-7170 | [email protected]
Alicia Yang, Project Manager III
Orange County Transportation Authority (OCTA)
600 S. Main St.

Orange, CA 92868
714-560-5362 | [email protected]
Anna Moneymaker, Port Planner
Port of Long Beach (POLB)
415 W. Ocean Blvd.

Long Beach, CA 90802
562-283-7196 | [email protected]
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 FEE SCHEDULE | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 20

FEE SCHEDULE
Table 5 provides a schedule of Iteris standard hourly rates by job classification.

Table 5 – Iteris Standard Fee Schedule

CLASSIFICATION
STANDARD BILLING RATES*
Min Max
Support Staff I $104 $136
Support Staff II $163 $222
Assistant Engineer/Planner $113 $155
Associate Engineer/Planner $135 $183
Engineer/Planner $140 $196
Senior Engineer/Planner I $195 $246
Senior Engineer/Planner II $228 $264
Lead Engineer/Senior Manager $236 $315
Associate Vice President/Principal/Director $258 $349
Vice President/Chief Scientist $343 $454
Billing Rates effective for first three (3) contract years.

Task Orders will utilize individual staff rates at time of Letter Proposal submission, NTE Max Billing Rates.

Standard Terms and Conditions
• Subconsultant, Subcontractor and Equipment expenses to be billed at negotiated cost plus markup. • Other direct expenses to be billed at cost, unless otherwise negotiated. • Mileage rates will be based upon current IRS standard rates.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 RESUMES | CITY OF GARDENA

Proposal for On-Call Professional Services: Traffic Engineering Iteris, Inc. | 21

RESUMES
• Paul Frislie, PE, IMSA
• Bernard Li, EE, TE, PTOE
• Andrew Freeman, PE, PTOE
• Deepak Kaushik, PE
• Jason Xu, PE, PTOE, PMP
• Rasool Andalibian, PHD
• Ted Huynh, PE, TE
• SungWoo Jo, TE
• Chris Devlin
• Evan Shipley, EIT
• Delbert Smith-Lavezzari
• Ciera Fernandez, EIT
• Raymond Ling, EIT
• Alex IngogIia
• Richard Luo, EIT
All licensed professional Engineers have no disciplinary actions taken against them.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Frislie serves as a Principal Engineer of Iteris’ Consulting Solutions and has been with the firm since January 2001. For over 23 years, Mr. Frislie has been involved in several transportation and traffic engineering projects that include both planning as well as design and deployment of ITS, systems integration, and traffic signal design. Recently, he has served as the Project Manager for the Artesia Blvd Arterial Improvement Project and the Redondo Beach Blvd Arterial Improvement Project in the City of Gardena, the City of Long Beach Mid-City Signal Coordination Project, the Euclid St Regional Traffic Signal Synchronization project and the Yorba Linda Boulevard Regional Signal Synchronization Project. Mr. Frislie’ s ITS experience comprises fiber optic communications, wireless communications, Closed-Circuit Television (CCTV), Video-Detection System (VDS) and Dynamic Message Signs (DMS) including the development of numerous ITS Master Plans for the Cities of Oxnard, Newport Beach, Cypress, Ventura, Buena Park, Gardena, and Whittier. Along with his ITS experience, Mr. Frislie has extensive experience in the field during construction conducting inspections, daily reports, quantity takeoffs, and project final acceptance and close-out punch lists.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP) – City of La Habra, CA
Mr. Frislie serves as the System Design Lead on this signal synchronization project for City of La Habra. Project includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project.

Iteris will conduct all engineering, construction management, inspection, and administrative tasks necessary to complete the project. After the construction and implementation phase of the project, Iteris will provide operations, and maintenance services for three years. The project began in March 2023 and is expected to be completed March 2028.

EDUCATION
MBA, University of Phoenix, 2011
BS, Civil Engineering, University of
California, Irvine, 2000

YEARS OF EXPERIENCE
With Iteris: 22 Total: 23

REGISTRATIONS
Civil Engineer (PE)
CA #72982, 2008
International Municipal Signal
Association (IMSA)
FOA Fiber Optic Technician,
#CFOT_97189, 2019
Traffic Signal Level III, #CE_97189, 2022
Traffic Signal Level II, #BB97189, 2012
Traffic Signal Level I, #AA97189, 2012
Signal Inspector Level II, #AT_97189,
2018
Signal Inspector Level I, #SI97189, 2014
Work Zone Safety, #ZZ97189, 2010

CORE DISCIPLINES
Traffic Engineering & Operations
ITS Planning/Design/Integration
Traffic Signal Design
Construction Management
Transit

AFFILIATIONS
Orange County Traffic Engineering
Council (OCTEC)
PAUL

FRISLIE, PE, IMSA

PRINCIPAL ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

PAUL FRISLIE, PE, IMSA

PRINCIPAL ENGINEER
Moving smarter, together.

I-405 Design-Build Improvement Project,
Orange County Transportation Authority (OCTA)
– Orange County, CA
Mr. Frislie is serving as TMS Engineer for Iteris,
acting as a subconsultant of a multidisciplinary
design and construction team, on this $1.2 billion
dollar design-build project in Orange County
California. The project will improve 16 miles of I-405
between SR-73 in Costa Mesa and the I-605 near the
Los Angeles County line. The project includes adding
one regular lane in each direction from Euclid St to I605, making improvements to freeway entrances, exits and bridges, and will also implement Express
Lanes that expands the existing HOV lane from one
lane to two lanes in each direction from SR-73 to I605. Iteris is responsible for design of the Caltrans ITS field infrastructure, temporary ITS field
infrastructure supporting maintenance of traffic
during construction, toll system infrastructure and
coordination, street lighting, agency traffic signal
improvements along the corridor and development
of the project Traffic Management Plan (TMP). Mr.

Frislie is responsible for the planning, design, and
deployment of the TMP. The Design project began in
January 2017 and completed December 2019.

Construction was completed October 2023.

Pacific Coast Highway (PCH) Arterial
Improvements Design Services Project – City of
Redondo Beach, CA
Mr. Frislie served as Project Manager to provide
preliminary engineering and design of PCH from
Anita St to Palos Verde Blvd. The goal of the project
is to prepare a traffic analysis and conceptual plan
documents (plans and estimates) to improve PCH.

For the initial preliminary engineering phase, Iteris
will perform detailed field investigation of the entire corridor to identify deficiencies and recommended
improvements to enhance safety and traffic flow
along the corridor. Topographic survey, geotechnical
investigation, traffic signal, signing and striping
inventory will be conducted as part of the field
investigation. Upon City’s approval of the Traffic
Analysis Report (PDR), Iteris will prepare a
conceptual and preliminary design package during
the design phase, which includes traffic signal
upgrades, signing and striping modifications for the
entire corridor. The project began in December 2016
and was completed December 2022.

Von Karman Avenue/Tustin Ranch Road
Regional Traffic Signal Synchronization
(RTSSP) Project – City of Irvine, CA
Mr. Frislie serves as QA/QC Lead for this project in
which Iteris is assisting the City with multijurisdictional improvements of the 7.9-mile stretch of Von Karman Avenue and Tustin Ranch Road in the
cities of Irvine and Tustin. The project requires
retiming of 30 signalized intersections, which
includes the two Caltrans crossings at the I-5
interchange. Iteris will assist the agencies with the
design and construction management of the new
signal improvements which include new Video
Detection Systems (VDS), controller cabinets,
pedestrian heads, first fiber communication to Tustin
signals and a new Advanced Traffic Management
System (ATMS) to remotely monitor the signals.

Iteris also assisted with conversion of new
configuration modules to transition existing signals
online in their Actra system to their newer Centracs
system. The project began in April 2017 and is
scheduled to be completed in June 2019. Two years
of Operations and Maintenance (O&M) will occur
from July 2019 through September 2022.

Moulton Parkway Traffic Signal Synchronization
(TSS) and Operations and Maintenance (O&M)
Project – City of Laguna Woods, CA
Mr. Frislie served as QA/QC Lead and Construction
Manager as part of a multidisciplinary team for the
Laguna Woods TSS project which will provide signal
synchronization and equipment upgrades along
Moulton parkway from Lake Forest Dive and Camino
del Avion in collaboration with the Cities of Laguna
Hills, Laguna Niguel, and Caltrans. The project
includes the development, implementation and finetuning of the AM, PM, mid-day, and Saturday peak periods traffic signal coordination timing plans for all 37 intersections along the corridor. The traffic signal upgrades include the installation of new video
detection system at 3 project intersections,
Uninterruptible Power Supply (UPS) to IP at 7 project
intersections, wireless communication upgrade form
Moulton Parkway at El Toro Road to City of Laguna
woods City Hall, new Type P cabinet at Moulton
Parkway at Glenwood Drive, and new 12-pari #19
solid copper interconnect cable along Golden lantern
from paseo Escuela to Paseo de la Colinas. The
project began in August 2015 and will be completed
in December 2018. O&M began in July 2016 and
completed July 2020.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Li serves as a Vice President of Iteris’ Mobility Consulting Solutions and has been with the firm since 2010. He has 36 years of experience in providing professional services in planning, design and implementation of traffic engineering and Intelligent Transportation Systems (ITS). Mr. Li has served as Project Manager or Principal-inCharge on numerous traffic and ITS design/construction, traffic signal timing and synchronization, operational analysis, feasibility studies and municipal traffic engineering projects. His traffic engineering design expertise includes traffic signal installation, signal modification, roadway signage/striping, street lighting, and worksite traffic control and neighborhood traffic management. Mr.

Li’s ITS experience comprises fiber optic communications, wireless communications, Closed-Circuit Television (CCTV), Video-Detection System (VDS) and Dynamic Message Signs (DMS). He is also highly experienced in traffic signal operations, having assisted numerous agencies in the analysis, retiming, and synchronization of traffic signals, both corridor and network wide. Mr. Li’s transportation planning expertise includes traffic impact studies, parking studies, transportation master plans, signal warrant analysis and stop warrant analysis. He has served as City Traffic Engineering Consultant for many agencies, helping to resolve numerous day-today traffic engineering issues, including resident inquiries, plan checking, and safety evaluations.

Warner Avenue Regional Traffic Signal Synchronization
Projects (RTSSPs) – OCTA, Orange County, CA
Mr. Li serves as Project Manager twice (2012 to 2015, and 2022 to present) to provide ITS upgrade design/build and traffic signal synchronization improvements along Warner Avenue, a major eastwest arterial, from Pacific Coast Highway to Pullman Avenue. The corridor encompasses a total of 43 signals, covering 13 miles of roadway, crossing the Cities of Huntington Beach, Fountain Valley, and Santa Ana. The first project, which started in 2012, was funded by the Renewed Measure M (aka M2), while the second project, started in 2022 with a value of $4.4 million, was funded by both M2 and Senate Bill 1 (SB1). For both projects, numerous ITS equipment upgrade was provided, including fiber-optic communications, Closed-Circuit Television (CCTV), video detection systems (VDS) signal controllers and cabinets. The current project also includes implementation of ClearGuide arterial performance measure (APM) and signal performance measure (SPM).
.

EDUCATION
BS, Electrical Engineering, University of
Southern California, Los Angeles, 1988

YEARS OF EXPERIENCE
With Iteris: 13 Total: 36

REGISTRATIONS
Electrical Engineer (EE)
CA # 14842, 1995
AZ # 37241, 2002
NV #21200, 2011
Traffic Engineer (TE)
CA # 1763, 1993
Professional Traffic Operations (PTOE)
PTOE # 214, 2000

CORE DISCIPLINES
Traffic Engineering & Design
Signal Timing & Coordination
Traffic Signal Operations
Signal System Selection & Deployment
ITS Planning & Design
ITS Systems Engineering
Traffic Simulation & Transportation
Planning
Municipal Traffic Engineering

AFFILIATIONS
Institute of Transportation Engineers
(ITE)
ITS California
Orange County Traffic Engineering
Council (OCTEC)
BERNARD K.

LI, EE, TE, PTOE

VICE PRESIDENT
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 BERNARD K. LI, EE, TE, PTOE

VICE PRESIDENT
Moving smarter, together.

In addition, both projects also include synchronization of all 43 intersections along the corridor with AM, PM, mid-day, off-peak and weekend traffic signal
coordination timing plans. The first project began in
August 2012 with new coordination timing
implemented in June 2013, and resulted in a B/C ratio
of 14:1. Operations and Maintenance (O&M) was
provided through May 2015. The second project
started in January 2022 and is ongoing.

San Bernardino Valley Coordinated Traffic
Signal System (SBVCTSS) / Development of a
Smart County Master Plan, San Bernardino
County Transportation Authority (SBCTA) – San
Bernardino County, CA
Project 1 – SBVCTSS (Jan. 2017 to Jan. 2023)
Mr. Li served as the Project Manager of a $4 million
SBVCTSS project to assist 16 local agencies within
the San Bernardino Valley (SBV) to improve traffic
progressions along many key regional corridors. The
project consists of four main components: First,
develop traffic signal coordination master plans for
five different sub-regions within the Valley. The
Master Plan served as a roadmap for all future signal
coordination in the Valley. Second, update signal
coordination timings for over 400 traffic signals to
reduce travel times, delays, and greenhouse gas
emissions. Third, conduct assessments of all the
signal synchronization corridors and traffic signals to ensure they are all performing well and as planned
on a semi-annual basis. Fourth, provide system
support services to assist any SBV agencies in
resolving technical issues, e.g. troubleshooting
communications and bring signals back online at the
agencies’ traffic signal systems. As part of the system support task, Bernard and his team is currently
designing and implementing technological and ITS
improvements along the Haven Avenue corridor
within Ontario and Rancho Cucamonga, which
includes Iteris’ ClearGuide Signal Performance
Measure (SPM) and ClearAsset Asset Management
System (AMS) software, as well as center-to-center
communications between both cities and between
the cities and Caltrans. This project was initially a 5- year contract that began in January 2017, but SBCTA
is very pleased with the services provided by Bernard
and his team that a one-year contract extension was
executed, with a new project end date of early
January 2023.

Project 2 - SBVCTSS and Development of a Smart
County Master Plan (Jan. 2023 to present)
Iteris recently was awarded a new $2.5M contract by
SBCTA through competitive procurement process to
continue provide SBVCTSS on-call support services
for five more years (2023 thru 2027). This new
project, also managed by Bernard, includes a task
order to develop a Smart County Master Plan for San
Bernardino County that will provide a roadmap for
improving the County’s Smart infrastructure to
better serve the County’s growing technology needs.

The Plan will assist the County in using new
technologies to improve community member’s lives
and to achieve technology implementation goals for
SBCTA’s member agencies.

Euclid Street Corridor Project Regional Traffic
Signal Synchronization Program (RTSSP – City
of La Habra, CA
Mr. Li serves as the Principal-in-Charge and QA/QC
Manger on this signal synchronization project for
City of La Habra. Project includes the
synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the
Cities of La Habra, Fullerton, Anaheim, Garden
Grove, Santa Ana, and Fountain Valley along Euclid
Street. Iteris is providing communication system
analysis for the City of Fullerton and the City of Santa Ana through this project. Iteris will conduct all
engineering, construction management, inspection,
and administrative tasks necessary to complete the
project. After the construction and implementation
phase of the project, Iteris will provide operations,
and maintenance services for three years. The
project began in March 2023 and is expected to be
completed March 2028.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Freeman serves as a Senior Engineer for Iteris’ Mobility Consulting Solutions division and has been with the firm since July 2023. He has nearly 10 years of experience working in the fields of traffic engineering and traffic signal design.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Regional Traffic Signal Synchronization Program (RTSSP) Project for Tustin Avenue - Rose Drive – City of Orange, CA Mr. Freeman serves as Project Engineer on this project. Under the project agreement, Iteris will make infrastructure upgrades, signal coordination and timing improvements, develop signal timing plans for all signalized intersections along the corridor, provide vehicle turning movement counts and perform before-and-after corridor analysis along the Tustin Avenue/Rose Drive corridor from First Street in the City of Tustin to Wabash Avenue in the City of Yorba Linda. The project area comprises 54 signalized intersections spanning six cities – Tustin, Santa Ana, Anaheim, Orange, Placentia, and Yorba Linda – as well as key highway on/off ramps under Caltrans, in Orange County, California. The project started in August 2020 and is ongoing. Construction is slated to start in Summer 2023.

Yorba Linda Boulevard/Weir Canyon Road Corridor Regional Traffic Signal Synchronization Project- City of Yorba Linda, CA Mr. Freeman serves as Project Engineer on this project. Under the project agreement, Iteris will make infrastructure upgrades along Yorba Linda Boulevard from Van Buren Street to new River Road in the City of Yorba Linda. Additionall, Iteris will analyze signal coordination and timing improvements, develop signal timing plans for all signalized intersections along the corridor, provide vehicle turning movement counts and perform before-and-after corridor analysis on Yorba Linda Boulevard from State College Boulevard in Fullerton to Canyon Drive in Anaheim. The project began in July 2023 and is ongoing.
.

EDUCATION
BS, Civil Engineering, University of Illinois
Urbana-Champaign, IL, 2014

YEARS OF EXPERIENCE
With Iteris: <1 Total: 9

REGISTRATIONS
Civil Engineer (PE)
IL #062.070815, 2018
Professional Traffic Operations Engineer
(PTOE)
#4607, 2019

CORE DISCIPLINES
Traffic Engineering
Traffic Signal Design
Traffic Signal System Upgrades

AFFILIATIONS
Institute of Transportation Engineers
(ITE)

ANDREW FREEMAN,

PE, PTOE

SENIOR ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

ANDREW FREEMAN, PE (IL) PTOE

SENIOR ENGINEER
Moving smarter, together.

Alternative Signal Communication
Demonstration Project – Orange County, CA
Mr. Freeman serves as Project Engineer on this
project. Iteris was selected by OCTA to provide low
cost solution to bring intersection online and/or
provide additional redundancy to the traffic
network. This project will provide traffic signal
communication improvements throughout various
cities’ traffic signal networks within Orange County.

Cities that require upgrades as part of the project
are:
• City of Huntington Beach
• City of La Habra
• City of Lake Forest
• City of Newport Beach
• City of Rancho Santa Margarita
• City of Seal Beach
• City of Yorba Linda
The cities will be getting upgrades to their existing
communication infrastructure at intersections that
are either offline, have outdated equipment, and/or
seeking alternatives solutions to ensure reliability,
enhanced security, and scalability for a robust
network that will be viable for the next 10 to 15
years. The primary goal of this project is to analyze
and test connectivity at locations where there is
existing interconnect (copper, fiber, and wireless)
systems, so that appropriate design measures can be
applied to deploy new ethernet switches, ethernet
cards, wireless radios, and/or cell modems to
support the management of each city’s traffic
network. Iteris will procure, configure, and install all the equipment as part of this project. The project
started in August 2022 and is expected to be
completed by August 2023.

PREVIOUS PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
C*NECT Capital Improvements Projects, Design
and Project Management – Chicago Department
of Transportation, Chicago, IL
Mr. Freeman served as Project Manager on this
project. While with another firm, Mr. Freeman
provided engineering and project management
services to develop traffic signal improvements and
modernizations for the Chicago Department of
Transportation’s capital improvement programs. Mr.

Freeman was responsible for traffic signal design,
interconnect fiber design, quantity and cost estimate
calculations, and agency coordination.

Traffic Engineering Services - Illinois Tollway
Mr. Freeman served as Project Engineer on this
project. While with another firm, Mr. Freeman
provided an assessment and recommendations to
improve the existing secondary crash processing and
identification logic for the Illinois Tollway. Mr.

Freeman provided data analysis support and assisted
in develop dashboards in PowerBI to ease data
manipulation and assist in trend analysis.

Village of Creshwood Traffic Signal
Modernization Project – Village of Crestwood, IL
Mr. Freeman served as Project Manager on this
project. While with another firm, Mr. Freeman
develop engineering and project management
services to provide traffic signal modernization plans
to three intersections in the Village of Crestwood.

Mr. Freeman was responsible for traffic signal design
including equipment layout, interconnect fiber
design, quantity and cost estimate calculations,
street sign layouts, and agency coordination.

In-House Traffic Consultant – Chicago
Department of Transportation
Mr. Freeman served as an in-house Project Engineer
for the Chicago Department of Transportation on
this project. While with another firm, Mr. Freeman
developed detailed plans for pavement markings,
signage, and geometric improvements including
pedestrian refuge islands and curb extensions. Mr.

Freeman was also responsible for analyzing crash
data to identify trends and potential improvements
to pedestrian and vehicle safety for corridors and
intersections. Mr. Freeman provided review of
proposed site plans and developments throughout
Chicago to ensure compliance with traffic
engineering best practices and city standards.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Kaushik serves as a Principal Engineer for Iteris’ Mobility Consulting Solutions and has been with the firm since 2008. He has over 21 years of transportation planning and engineering experience, which includes transportation systems analysis, multimodal mobility planning, highway operations, traffic safety, and travel-demand modeling. He enjoys the technical aspects of the projects he manages, but also embraces the interaction with stakeholders, city officials, and the public. Most of all, he welcomes the challenge of finding solutions that improve mobility for all users.

PROJECT EXPERIENCE
SR-710 Northern Stub Repurposing Feasibility, City of
Pasadena – Pasadena, CA
Mr. Kaushik served as Project Manager for evaluating the feasibility of repurposing the SR-710 Northern Stub in the City of Pasadena.

The project included two concepts to repurpose and/or reconfigure freeway ramp connections associated with SR-710. Mr. Kaushik led the effort in evaluating potential impacts to local intersections, freeway ramps, and street segments in the vicinity of the project area. The project began in November 2019 and was completed in June 2022.

I-10/Da Vall Drive Interchange TEPA, City of Cathedral City – Cathedral City, CA
Mr. Kaushik served as Project Manager for preparation of the Traffic Engineering Performance Assessment (TEPA) analysis/report for the I-10/Da Vall Drive Interchange project in Cathedral City. The project includes construction of a new interchange along I-10 at Da Vall Drive, as well as the extension of Da Vall Drive from its current terminus. Mr. Kaushik led Iteris’ efforts in evaluating multiple interchange alternatives to inform the feasibility of design and carry forward to the next phase. A Caltrans Intersection Control Evaluation (ICE) memorandum was also completed, which considers alternative intersection control designs at state highway intersections, including roundabout operations. The project began in January 2019 and was completed June 2021.

EDUCATION
BS, Civil Engineering, University of
California, Irvine, 2001

YEARS OF EXPERIENCE
With Iteris: 15 Total: 21

REGISTRATIONS
Civil Engineer (PE)
CA #72838, 2008

CORE DISCIPLINES
Transportation Planning
Multimodal Planning
Travel Demand Modeling
Transit
DEEPAK

KAUSHIK, PE

PRINCIPAL ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

DEEPAK KAUSHIK, PE

PRINCIPAL PLANNER
Moving smarter, together.

Citywide Traffic Circulation Study, City of San
Marino – San Marino, CA
Mr. Kaushik serves as Project Manager for
preparation of a Citywide Traffic Circulation study
for the City of San Marino. The project includes an
evaluation of current traffic conditions at 30
intersections and identification of improvement
recommendations, geared mostly towards traffic
calming and safety. Mr. Kaushik has presented both
initial findings and improvement recommendations
to the Public Safety Commission and will eventually
present the final report outcomes to City Council.

The project began in August 2019 and was
completed in May 2023.

Santa Ynez Valley Traffic Circulation and Safety
Study, Santa Barbara County of Association of
Governments (SBCAG) – Santa Barbara
County, CA
Mr. Kaushik served as the Project Manager and
Outreach Task Lead for the Traffic Circulation and
Safety Study. The purpose of the study is to
comprehensively assess and identify needed current
and forecasted future circulation and safety
improvements for the multimodal transportation
needs of the Santa Ynez Valley. The existing highway
network is stressed serving growing
numbers of local trips, tourism, regional trips, and
commuters. Iteris is preparing a quantitative
assessment of travel conditions and assessing the
potential value of various improvement scenarios
These potential short and long-term improvements
will be developed to accommodate increasing
demand, improve safety, increase connectivity, and
prioritize improvements to the highway network
which will lead to increased quality of life and
sustainability for residents in the Valley. The project began in November 2018 and was completed in June
2020.

TRANSPORTATION PLANNING
Compton Boulevard Complete Streets Planning
and KBK Site Traffic Impact Analysis – City of
Compton, CA
Mr. Kaushik served as Project Manager for a traffic
impact analysis of a mixed-use development (KBK
site) along Compton Boulevard, as well as complete
streets planning in the City of Compton. The project
included a reimagination of Compton Boulevard,
with conceptual design of protected bike lanes, curb
extensions, and mid-block crossings. Mr. Kaushik led
the team in preparing the traffic analysis for the
mixed-use development as well as the impact of the
redesign which resulted in a reduction in vehicle
travel lanes. The project began in June 2020 and
completed in February 2021.

Laserfiche Office Project Traffic Impact Analysis
– City of Long Beach, CA
Mr. Kaushik served as Project Manager for a traffic
impact analysis of an office building development in
the City of Long Beach. He managed the traffic
analysis tasks, which included evaluating 9
intersections within the project vicinity, and
coordinated with the project applicant and City staff.

He also led the preparation of a conceptual design
plan to illustrate the feasibility of adding an
additional left-turn lane along Long Beach
Boulevard, as a mitigation measure. The project
began in April 2018 and completed in February 2019.

Prairie Station Traffic Impact Study – City of
Inglewood, CA
Mr. Kaushik served as Project Manager for a traffic
impact study of a residential project along Prairie
Avenue in the City of Inglewood. The project
consisted of 400 multi-family residential units. Iteris prepared existing and future year analyses of the
adjacent intersections in the vicinity of the project
site. Mr. Kaushik led the team in the traffic
operations analysis as well as the CEQA
transportation analysis. The project began in August
2020 and completed in January 2021.

Beverly Hills Complete Streets Plan – City of
Beverly Hills, CA
Mr. Kaushik served as Task Lead for a Complete
Streets project for the City of Beverly Hills. The Plan defined and provided a guiding policy that prioritizes
mobility elements and proposes implementation
phases for Complete Streets elements. Mr. Kaushik’s
responsibilities included leading the development of
the draft and final complete streets plan. The project
began in October 2017 and was completed in May
2019.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Xu serves as Associate Vice President for Iteris’ Mobility Consulting Solutions division and has been with the firm since January 2018. He has 17 years of experience working in various fields of traffic engineering and design, transportation planning, ITS design, signal system upgrade and integration, Transportation Management Center (TMC) operation, active transportation planning and design, freeway and arterial performance analysis, transportation system simulation, and a variety of engineering studies. Mr. Xu is an expert with traffic signal operation and synchronization. He served as project manager or task lead on numerous development/implementation of regional-based signal synchronization master plans, city-wide signal coordination, multijurisdictional signal synchronization, transit signal priority, and special signal operation logic. Mr. Xu is also skilled in the technologies of signal system interconnect, traffic detection, Signal Performance Measures (SPM) and Emergency Vehicle Preemption (EVP).

PROJECT EXPERIENCE
Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP) – City of La Habra, CA
Mr. Xu serves as the Project Manager on this project which includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project. Iteris will conduct all engineering, construction management, inspection, and administrative tasks necessary to complete the project. After the construction and implementation phase of the project, Iteris will provide operations, and maintenance services for three years. The project began in March 2023 and is expected to be completed March 2028.

Brookhurst Street/Road Traffic Signal Synchronization (TSS) Corridor – Orange County, CA, OCTA – Orange County, CA
Mr. Xu serves as Task Leader to optimize traffic signal synchronization timing plans at 59 intersections along the 16.5-mile Brookhurst Street corridor.

EDUCATION
MS, Civil Engineering, University of
Nevada, Reno, NV, 2007
MS, Transportation, Beijing Jiaotong
University, Beijing, China, 2004
BS, Transportation Engineering, Beijing
Jiaotong University, Beijing, China, 2001

YEARS OF EXPERIENCE
With Iteris: 6 Total: 17

REGISTRATIONS
Civil Engineer (PE)
CA #80744, 2011
Professional Traffic Operations Engineer
(PTOE)
PTOE #3480, 2013
Project Management Professional (PMP)
PMP #2815124, 2020

CORE DISCIPLINES
Traffic Engineering & Operations
O&M

AFFILIATIONS
Institute of Transportation Engineers
(ITE)

JASON XU,

PE, PTOE, PMP

ASSOCIATE VICE PRESIDENT
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

JASON XU, PE, PTOE, PMP

ASSOCIATE VICE PRESIDENT
Moving smarter, together.

Development and implementation of this optimized
cross-jurisdictional signal optimization involves
OCTA, six local cities, and Caltrans. The project
began in June 2018. Mr. Xu’s involvement on the
project began in June 2018 and was completed in
June 2023.

Traffic Signal Synchronization and Intelligent
Transportation Systems Engineering Services
Orange County Transportation Authority (OCTA)
– Orange County, CA
Mr. Xu served as Project Manager/Task lead for
eight (8) projects for this multi-year program that
upgraded signal system and timing along regionally
significant corridors:
• MacArthur Corridor (Project Manager)
• Culver Corridor (Project Manager)
• Bake Parkway Corridor (Project Manager)
• Santa Margarita Parkway (Project Manager)
• Orangewood Avenue (Project Manager)
• Brookhurst Street (Task Lead)
• Katella Avenue (Task Lead)
• La Palma Avenue (Task Lead)
The provided services include:
• Deployment of new Intelligent Transportation
System (ITS) equipment and communication
infrastructure to support the management of
the cities’ transportation network, implement
optimized coordination timing plans to achieve
optimal traffic flow, and improve safety for all
road users, including vehicles, buses, bicycles,
and pedestrians.
• Iteris’ Intersection-as-a-Service™ end-to-end
solution offering will deliver proactive
monitoring of traffic signal operations at all
project intersections.
• Assisting local agencies to identify technical
standards and adopt suitable technologies and
ITS standards Design and implementation of
cross-jurisdictional signal synchronization and
interoperable ITS infrastructure.

Lake Forest Traffic Signal Management On-Call
Services – City of Lake Forest, CA
Beginning in July 2021, Jason serves as PM to
provide traffic signal operation and management
services to the City of Lake Forest. One of the main
duties is to operate and maintain all the traffic
signals within the City, including:
• Verify all timings are programmed correctly and
that all traffic signals are in good working order
• Review scheduled operations on the central
traffic signal system to automatically perform a
variety of maintenance tasks
• Report traffic signal problems and malfunctions
to the City’s signal maintenance contractor
• Assist the City in resolving traffic signal control
complaints
• Investigate and recommend to the City
improvements such as signal phasing,
equipment upgrades and significant timing
adjustments
• Coordinate with contractors and modify signal
timings due to roadway construction
Under the terms of the contract, Iteris is also
delivering its ClearGuide® software that helps the
City improve safety and mobility by turning large
amounts of complex transportation data into
insights for smart, data-driven operations and
planning decisions.

San Bernardino Valley Coordinated Traffic
Signal System (SBVCTSS), San Bernardino
County Transportation Authority (SBCTA) – San
Bernardino County, CA
Mr. Xu is providing engineering support on this
regional TSS project to assist 16 local agencies within the San Bernardino Valley area to improve traffic
progressions along many key regional corridors. Mr.

Xu assists in the assessment of the existing signal
operation and development traffic signal
coordination master plans for five different subregions within the Valley. The Master Plan will serve as a roadmap for all future signal coordination in the
Valley. Second, update signal coordination timings
for over 500 traffic signals with a goal of reducing
travel times, delays and GHG emissions. The project
began in January 2017 and was completed in
December 2023.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Dr. Andalibian serves as a Senior Engineer for Iteris’ Consulting Solutions division and has been with the firm since October 2015.

He has eight years of experience working in Traffic Engineering and Transportation Planning. Dr. Andalibian’s areas of expertise are signal timing optimization, traffic operation, traffic impact analysis study, and travel demand modeling. His software experience includes Synchro, Tru-Traffic, HCS, TRAFFIX, VISSIM, CORSIM, SimTraffic, TransCAD, EMME/2, MicroStation, AutoCAD, Minitab, SPSS, GAMS and ArcGIS.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
On Street Bus Signal Priority System Project (City of Gardena Transportation Department, CA)
Mr. Andalibian serves as a Project Engineer on this project led by the City of Gardena. The project provides implementation of BSP along GTrans Line 2. GTrans buses equipped with BSP functionality will utilize the on-board WLAN radio to communicate with City of Gardena intersection controllers to request priority for the transit vehicles. Mr. Andalibian is involved in data migration from McCain 170 to Omin firmware for four intersections with railroad crossing/preemption including Vermont Ave @ 161st St, Vermont Ave @ Gardena Blvd, Vermont Ave @ Redondo Beach, and
Western Ave @ 166th St. The project started in 2019 and is ongoing.

Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP – City of La Habra, CA)
Mr. Andalibian serves as a Project Engineer on this signal synchronization project led by the City of La Habra. The project provides ITS upgrades, new traffic signal control equipment, communication improvements, and traffic signal synchronization for 67 traffic signals along Euclid Street and additional 69 offset traffic signals on crossing arterials throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley, and Caltrans jurisdictions . Iteris is Mr. Andalibian is involved in data collection and signal optimization tasks. After the completion of construction and implementation phase of the project, Iteris will provide operations, and maintenance (O&M) services for 24 months. The project began in March 2023 and is expected to be completed March 2028.

EDUCATION
PhD, Transportation Engineering,
University of Nevada, Reno, 2015
MS, Transportation Planning and Traffic
Engineering, Sharif University of
Technology, Tehran, Iran, 2006
BS, Civil Engineering, Azad University,
Mashhad, Iran, 2004

YEARS OF EXPERIENCE
With Iteris: 7 Total: 8

REGISTRATIONS
Engineer-In-Training (EIT)
NV #0T7039, 2013

CORE DISCIPLINES
Traffic Engineering & Operations
Signal Optimization & Synchronization
Travel Demand Modeling
RASOOL

ANDALIBIAN, PHD

SENIOR ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

RASOOL ANDALIBIAN, PHD

SENIOR ENGINEER
Main Street Regional Traffic Signal
Synchronization – OCTA, CA
Mr. Andalibian served as Project Engineer and task
leader on this Project. This project focused on
improving signal timing synchronization and
operation of 67 signals along a 12-mile segment of
the Main Street corridor going through the Cities of
Irvine, Santa Ana, Orange, and Caltrans jurisdictions.

The project required developing a traffic-responsive
plan for signals between McDurmott and Siglo in the
City of Irvine. Mr. Andalibian was responsible for the
development and implementation of the trafficresponsive plans. The project began in December 2020 and ended in June 2023.

Traffic Signal Retiming at 99 Locations, Chula
Vista, CA
Mr. Andalibian serves as Project Engineer on this
Project. This project is about improving signal timing
synchronization and operation of 99 signals in the
City of Chula Vista. Mr. Andalibian helps with QC/QA
of the developed signal timing plans. The project
began in March 2022 and is ongoing.

On-Call Traffic Engineering Services for
Brookhurst St/Rd Corridor, Orange County
Transportation Authority (OCTA) – Orange
County, CA
Mr. Andalibian served as Project Engineer on this
project and was involved in the development of
optimal signal timing plans and fine-tuning. This
project included 59 intersections along a 16.5-mile
segment of Brookhurst Street/Road. The project was
administrated by OCTA through a cooperative
agreement with the Cities of Huntington Beach,
Fountain Valley, Westminster, Garden Grove,
Anaheim, and Fullerton. The project began in July
2019 and ended in June 2023.

San Bernardino Valley Coordinated Traffic
Signal System (SBVCTSS), San Bernardino
County Transportation Authority (SBCTA) – San
Bernardino County, CA
Mr. Andalibian served as Project Engineer on this
regional TSS project to assist 16 local agencies within the San Bernardino Valley area to improve traffic
progressions along several key regional corridors.

Mr. Andalibian assisted in developing signal timing
plans. The project began in January 2017 and ended
in January 2020.

I-405 Design-Build Improvement Project,
Orange County Transportation Authority (OCTA)
– Orange County, CA
Mr. Andalibian is serving as Project Engineer for
Iteris, acting as a sub-consultant of a
multidisciplinary design and construction team, on
this $1.2 billion dollar design-build project in Orange County. The project will improve 16 miles of the I405 between the SR-73 freeway in Costa Mesa and the I-605 near the Los Angeles County line. The
project includes adding one regular lane in each
direction from Euclid Street to I-605, making
improvements to freeway entrances, exits and
bridges, and will also implement Express Lanes that
expands the existing HOV lane from one lane to two
lanes in each direction from SR-73 to I-605. Iteris is
responsible for the design of the Caltrans ITS field
infrastructure, temporary ITS field infrastructure
supporting maintenance of traffic during
construction, toll system infrastructure and
coordination, street lighting, agency traffic signal
improvements along the corridor and development
of the project Traffic Management Plan. Mr.

Andalibian is performing traffic analysis pertinent to
ramp-closures and subsequent traffic re-routings
during various implementation phases. The project
began in February 2017 and is ongoing.

Pacific Coast Highway Traffic Signal
Synchronization (TSS), Orange County
Transportation Authority (OCTA) – Orange
County and City of Newport Beach, CA
Mr. Andalibian served as Project Engineer on this
project and mostly involved in data collection task.

This project included 1) development of Plans,
Specifications and Estimates (PS&E) package for
approximately 11 miles of fiber optic cable,
integration of three new High-Definition (HD)
Closed-Circuit Television (CCTV) surveillance
cameras, a new Dynamic Message Signs (DMS) sign
and system; 2) upgrade of 15 controllers to 2070
controllers for Caltrans and provide fiber optic
communication connection to City Hall and Caltrans
Traffic Management Center (TMC); 3) development
of new timing plans for the entire corridor which
included 4 timing plans; 3 weekday peak period
timing plans and a weekend timing plan; and 4) 24
months of Operations and Maintenance (O&M)
services to maintain the communication system as
well the signal timing operations of the corridor. The
project began in June 2016 and ended in January
2022.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Huynh serves as a Senior Manager for Iteris’ Mobility Consulting Solutions and has been with the firm since 2017. He has over 14 years of experience working in the field of transportation engineering. His expertise includes traffic operations analyses, transportation impact analyses, traffic microsimulations, parking management planning, rail planning, complex spreadsheet and dataset analyses, cost estimation, and benefit-cost analyses. Mr.

Huynh’s software experience includes VISSIM, Synchro, SimTraffic, Vistro, ArcGIS, HCS, Adobe Creative Suite, Microsoft Office, and AutoCAD.

PROJECT EXPERIENCE

TRAFFIC OPERATIONS
East San Fernando Valley (ESFV) Transit Corridor Project – Los Angeles County Metropolitan Transportation Authority (Metro), City of Los Angeles, CA
Mr. Huynh serves as Deputy Project Manager and Task Lead responsible for developing a concept of operations plan via a project wide VISSIM simulation model in order to determine traffic operations impacts and propose preliminary engineering design alternatives and recommendations to safely and efficiently operate a new light-rail transit (LRT) Metro line through the San Fernando Valley. Iteris is working with Metro to produce preliminary 30% and 60% design plans for the upcoming ESFV Transit Corridor LRT project. This includes traffic signal design, interconnect, and a traffic and train interface concept of operations plan, in order to best identify and target traffic-related elements as part of this project, which is located within a congested and very highly traveled corridor in the Valley. The project began August 2019 and is scheduled to be completed in 2024.

I-405 Sepulveda Pass PA/ED – Metro – City of Los Angeles, CA
Mr. Huynh serves as Deputy Project Manager and Task Lead responsible for developing a corridor wide VISSIM simulation model in order to determine traffic operations impacts of implementing ExpressLanes through the I-405 corridor from the San Fernando Valley through West Los Angeles. The project is a complex project

EDUCATION
MS, Civil Engineering (Transportation),
University of California, Berkeley, 2009
BS, Civil Engineering (Minor: Political
Science), University of Oklahoma,
Norman, OK, 2008

YEARS OF EXPERIENCE
With Iteris: 7 Total: 14

REGISTRATIONS
Civil Engineer (PE)
CA #80087, 2012
Traffic Engineer (TE)
CA #2778, 2015

CORE DISCIPLINES
Traffic Engineering & Operations
Transportation Planning
Transit
Microsimulation

AFFILIATIONS
State of California Board for Professional
Engineers – Subject Matter Expert (Traffic
Engineering)
Institute of Transportation Engineers
(ITE) Southern California
Orange County Traffic Engineers Council
(OCTEC)

TED HUYNH,
PE, TE

SENIOR MANAGER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

TED HUYNH, PE, TE

SENIOR MANAGER
Moving smarter, together.
involving 49 ramp interchanges, 59 intersections,
and two freeway interchanges, and understanding
the changes in conditions under different
operational alternatives should tolling be
implemented on HOV lanes. The project began
February 2020 and is scheduled to be completed in
late 2024.

TRANSPORTATION PLANNING
Professional Services for Multimodal
Performance Monitoring, Alameda County
Transportation Commission (ACTC) – Alameda
County, CA
Mr. Huynh served as Project Manager responsible
for the 2022 Level-of-Service (LOS) Monitoring cycle
for Alameda CTC. Iteris provided multi-disciplinary
support for the Congestion Monitoring Program
(CMP), including auto, transit, and active
transportation analysis. Iteris has provided services
to ACTC via the Auto LOS Monitoring study since
2014 on a biannual basis. Iteris also computed INRIX
performance metrics of reliability and duration of
congestion. Where the use of commercial speed
data was not feasible, a robust floating car survey
methodology was applied. Iteris analyzed data
collected by AC Transit and LAVTA to determine
overall transit performance and oversaw a robust
data collection effort for 150 intersections
throughout the County to determine how nonmotorist users traveled. All data was compared to past monitoring cycles to gauge and determine
trends and changes in travel behavior, especially
pertinent following the COVID-19 pandemic. The
most recent evaluation cycle was completed in
March 2023.

On-Call Transportation Performance Monitoring,
Contra Costa Transportation Authority (CCTA) –
Contra Costa County, CA
Mr. Huynh served as Project Manager responsible
for the completion and delivery of the 2021 LOS
Monitoring cycle for CCTA. For this project Iteris
provided technical services for CCTA’s On-Call
Transportation Performance Monitoring, which
includes monitoring their biannual CMP and
Multimodal Traffic Service Objective (MTSO) from
2015 through the 2021 cycle. Iteris led the data
collection, analytics, and reporting for CCTA. Iteris
also assisted CCTA to validate the use of INRIX speed
data in their CMP and MTSO monitoring studies.

Iteris leveraged its custom software tools to quality‐
control and aggregate the speeds to the CMP or
MTSO link level, and report on vehicle LOS trends.

Additionally, Iteris also transitioned CCTA from their
intersection LOS monitoring from the CCTALOS
methodology to HCM 6 LOS methodology using
Synchro. The most recent evaluation cycle was
completed in December 2021.

US-101 High Occupancy Vehicle (HOV) /
Project Approval and Environmental Document
(PA&ED) – Ventura County Transportation
Commission (VCTC), Ventura County, CA
Mr. Huynh served as Project Engineer responsible
for intersection operations analysis and future
alternatives forecast volumes. In addition to
modeling and forecasting, Iteris was responsible for
providing post-processed travel model outputs
(including turning movements) for over 140
intersections along the 20+ mile corridor between
SR-23 and SR-33 in Ventura County. The project
began in June 2018 and was completed in June 2023.

Santa Ynez Valley Traffic Circulation and Safety
Study (Santa Barbara County Association of
Governments (SBCAG) – Santa Ynez Valley,
CA
Mr. Huynh served as Task Lead responsible for
developing a hybrid mesoscopic/microscopic VISSIM
simulation model to assess traffic needs and
impacts. Iteris is currently preparing a traffic and
safety study of the Santa Ynez Valley within Santa
Barbara County. The work effort includes three
phases: 1) initial outreach and data collection, 2)
simulation model development, 3) improvement
alternatives evaluation. Iteris is working with SBCAG
to form a Technical Advisory Committee for the
project, consisting of local agency representatives. A
VISSIM model including intersection-level traffic
volumes and signal timing will be prepared for the
study area, in order to evaluate traffic operations. In addition, a study area bus tour will be arranged with
elected officials and committee members to identify
system inefficiencies, safety issues, and potential
improvement recommendations. The project began
in December 2018 and completed in June 2020.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Jo serves as Engineer at Iteris’ Mobility Consulting Solutions division and has been with the firm since July 2021. He has 8 years of experience in conducting a variety of traffic impact analysis related to mixed-use land use developments, multimodal system and corridor plans, and intersection and roadway operations.

SungWoo is experienced in using various traffic analysis and model software including Synchro, Simtraffic, Vistro, Vissim, Aimsun, and HCS7, and related database to assess transportation impacts and performances. Prior to joining Iteris Inc, he had served as a Traffic EIT at HDR Inc. for three years in Walnut Creek, CA.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Traffic Model and General Plan Update, City of Santa Barbara, CA
Mr. Jo served as a traffic analyst on this project for the City of Santa Barbara. Developed a Vistro model of the key 50-intersection roadway network across the city in support of the traffic model update. Level of service and capacity analysis of the study intersections in the existing and future conditions. The project began December 2021 and is ongoing.

Easter Avenue Multimodal Improvement Project, City of Los Angeles, CA
Mr. Jo served as a traffic analyst on this project for the City of Los Angeles. Developed a Synchro model of a 1.5-mile corridor of Eastern Avenue. Performed a level of service analysis of existing conditions, and future conditions with the implementation of the corridor geometry changes to accommodate a road diet and multimodal facilities. The project began August 2021 and is ongoing.

On-Call Traffic Engineering Services, City of Irwindale, CA Mr. Jo served as a traffic engineer to support the City of Irwindale for the on-call traffic engineering services. Various tasks included collision analysis, red curb assessments, sight distance studies, and safety analysis. Presented safety recommendations including signages, guardrails, and red curbs per MUTCD and AASHTO guidelines. This service began January 2022 and is ongoing. .

EDUCATION
MS, Civil Engineering, University of
California, Irvine, CA, 2021
BS, Civil and Environmental Engineering,
University of California, Los Angeles, CA,
2018

YEARS OF EXPERIENCE
With Iteris: 2 Total: 8

REGISTRATIONS
Traffic Engineer (TE)
CA #3019

CORE DISCIPLINES
Traffic Engineering & Operations
Traffic Simulation Modeling
Transportation Planning

SUNGWOO
JO, TE

ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

SUNGWOO JO, TE

ENGINEER
Moving smarter, together.
1st Street and Bolsa Avenue Regional Traffic
Signal Synchronization Program, Orange
County Transportation Authority, CA
Mr. Jo served as a traffic analyst on this project for
Orange County Transportation Authority (OCTA).

Updated and refined the Synchro model, which
spans across the cities of Westminster, Garden
Grove, Huntington Beach, Santa Ana, and Tustin in
support of the signal coordination and
synchronization effort. His participation in this
project began September 2022 and ended December
2022.

US Department of Veteran Affairs (VA),
Alameda Point Multi-Specialty Outpatient Clinic -
City of Alameda, CA
Mr. Jo served as a traffic analyst on this project for
the City of Alameda. Synchro analysis of a 30-
intersection roadway network across Oakland and
Alameda. VMT analysis to assess future traffic
impacts of the new outpatient clinic in support of
traffic impact analysis for CEQA documentation. The
project began in May 2018 and ended in September
2020.

TRAFFIC SIMULATION MODELING
East San Fernando Valley Transit Project – City
of Los Angeles, CA
Mr. Jo served as a traffic modeler on this project for
the City of Los Angeles. VISSIM analysis included a

6.7-mile segment of Van Nuys Boulevard corridor in
support of a traffic and train interchange plan.

Refined and completed a light rail transit network of
a 99-intersection network. Evaluated the automobile
and light rail transit performances to best optimize
the signal coordination and transit signal priority. His participation in this project began November 2021
and ended January 2023.

I-80/Powell Street Interchange Transit Access
Improvement Project – City of Emeryville, CA
Mr. Jo served as a traffic modeler on this project for
the City of Emeryville. VISSIM analysis of a freeway
interchange network in support of a transit
improvement study to install AC Transit bus-only
lanes and transit preemption plans. Developed and
calibrated the model network, implemented future
proposed changes, and performed a feasibility study
of different bus-only lane design scenarios. His
participation in this project began July 2021 and
ended May 2022.

East Portland Arterial Street Strategy (EPASS) -
City of Portland, OR
Mr. Jo served as a traffic modeler on this project for
the City of Portland. Developed an Aimsun model of
East Portland arterial streets known as EPASS
network. Researched and coded in Tri-County
Metropolitan Transportation District (TriMet) transit
network spanning across East Portland. Developed
and coded in signal scripts. The project began in
January 2020 and ended in June 2020.

TRANSPORTATION PLANNING
Texas Department of Transportation, Texas
Border Transportation Master Plan
Mr. Jo served as data analyst. Assisted task leads by
organizing and closely coordinating with
subconsultants and internal GIS team in support of a
binational and multimodal corridor identification,
designation, and needs assessment task. Provided a
comprehensive analysis of binational transportation
activities across highways and roadways, railways,
aviation, maritime, pipeline, pedestrian, and transit
networks. Helped prepare and organize appropriate
presentation materials for clients at Texas
Department of Transportation and stakeholder
engagements. The project began in September 2019
and ended in September 2020.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Devlin has served as a Senior Manager of Iteris’ Mobility Consulting Solutions since 2013. He has 32 years of experience in transportation planning and has managed and participated in a wide variety of transportation studies. These include travel demand forecasting studies, travel surveys, traffic impact studies, parking studies, and corridor studies. Mr. Devlin is an experienced travel demand forecaster having developed and worked on over twenty different traffic models throughout the world. He is proficient in several modeling packages including TransCAD, Cube and emme2in .

He has developed model outputs to support the economic, financial and environmental analysis of major highway, transit and aviation projects and well as VMT statistics for SB 743. Mr. Devlin is also proficient in the use of Geographic Information Systems (GIS) for problem-solving, analysis, and presentation of results. He has designed and run GIS training courses specifically for Transportation Planners, including the design and coding of GIS utilities and scripts.

Mr. Devlin has also performed several large-scale transportation surveys from the survey design stage, through implementation, data cleaning, database population, and reporting.

PROJECT EXPERIENCE

TRANSPORTATION PLANNING & ANALYSIS
Irvine Great Park - Access And Parking Study - City of Irvine, CA
Mr. Devlin is managing a traffic access and parking study for the Irvine Great Park development which seeks to repurpose the former Marine Corp Air Station (MCAS) El Toro to a major new multi-land use attraction containing: museums, a sports park a 14,000 seat amphitehater, botanical gardens, a veterans memorial park, water park and other attractions. The project started in 2022 and is ongoing.

Express Lanes on I-405 and I-10 in Los Angeles County – LA Metro, CA
Mr. Devlin is providing technical traffic forecasting support to two major studies of Express Lanes in Los Angeles County: on I-405 over the Sepulveda Pass and on I-10 between I-605 and the San Bernardino County line.

EDUCATION
MSc, Transportation Planning and
Engineering, University of Leeds, UK,
1991
BA, Economics, Durham University, UK,
1987

YEARS OF EXPERIENCE
With Iteris: 9 Total: 32

CORE DISCIPLINES
Transportation Planning & Analysis
Travel Demand Forecasting
Geographic Information Systems
Transportation Surveys and Data Analysis
Traffic Asset Management Systems

AFFILIATIONS
Institute of Transportation Engineers
(ITE)
Orange County Traffic Engineering
Counsel (OCTEC)
CHRIS
DEVLIN

SENIOR MANAGER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

CHRIS DEVLIN

SENIOR MANAGER
Moving smarter, together.

His tasks involve traffic forecasting using the SCAG
RTP model and developing interfaces with
microsimulation models and well as providing traffic
engineering and other technical support. Both
projects started in 2022 and are ongoing.

On-Call Transportation Engineering Services –
City of Buena Park, CA
Mr. Devlin served as part of the Iteris team acting as
On-Call Transportation Engineer for the City of
Buena Park. He supported City Staff with completion
of transportation engineering functions within the
City’s Public Works Department. Mr. Devlin
periodically worked on-site at City Hall, providing asneeded services to support City services in the Public Works, Planning, and Police Departments. He
supported the review of new development plans,
the completion of new traffic signal installations or
signal upgrades, and the response to citizen inquiries
regarding traffic flow and safety conditions. Mr.

Devlin’s involvement was from January 2018 through
January 2019.

I-405 Design-Build Improvement Project,
Orange County Transportation Authority (OCTA)
– Orange County, CA
Mr. Devlin serves as a Transportation Planner as part
of a multidisciplinary design and construction team
on this $1.2 billion dollar design build project in
Orange County California. The project will improve
16 miles of the I-405 between the SR-73 freeway in
Costa Mesa and the I-605 near the Los Angeles
County line. The project includes adding one regular
lane in each direction from Euclid Street to I-605,
making improvements to freeway entrances, exits
and bridges, and will also implement Express Lanes
that expands the existing HOV lane from one lane to
two lanes in each direction from SR-73 to I-605. Mr.

Devlin is providing review of the TMP and MOT
components. The TMP includes detour routes and
supporting traffic analysis for partial or complete
closures for 17 arterial overcrossings and over 35
freeway ramps. The project began in February 2017
and is ongoing.

Irvine Business Complex (IBC) Five-Year Traffic
Study Update – City of Irvine, CA
Mr. Devlin served as Project Manager for a traffic
study to update the IBC Traffic Study with updated
land uses, traffic counts and highway network
improvements. The study analyses over 200
intersections and arterial segments in the City of
Irvine and adjacent jurisdictions as well as 60
freeway segments and over 100 freeway ramps. The
project involved the collection and quality control of
a large program of intersection turning movement
and tube counts along with a comparison to
historical data and continuity of flow analysis. PeMS
data was collected for the freeway mainlines. Traffic
model runs from the City of Irvine Traffic Model
(ITAM) were analyzed for Existing, Interim and
Buildout years with and without the IBC Vision Plan
land uses. Intersections and arterials were analyzed
using Intersection Capacity Utilization methodology
and freeways using Highway Capacity Manual 2010
analysis. Traffic impacts associated with the Vision
Plan were identified and a series of potential
mitigation measures, and their associated costs
identified for further study in a subsequent Nexus
and Fee study. Additional analysis involved the
testing of alternate roadway configurations and
signal warrant analysis. The project began in May
2018 and is ongoing. Mr. Devlin also performed the
previous iteration of this study between May 2015
and October 2016.

TRAVEL DEMAND FORECASTING
Citywide Traffic Model Development and OnCall Modeling Services – City of Anaheim, CA Mr. Devlin is providing ongoing model and traffic
study support to the City of Anaheim. He is
responsible for modifying and running the City’s
traffic model (ATAM) including post-processing and
evaluation of the model outputs. He also performs
traffic and parking studies as directed by the City.

Mr. Devlin’s involvement started in June 2014 and is
ongoing.

Irvine On-Call Traffic Modeling and
Transportation Analysis – City of Irvine, CA
Mr. Devlin provided modeling support for the City’s
traffic model (ITAM) for performing various
upgrades to the City’s modeling process including
links with OCTA’s travel model (OCTAM) and
developed GIS outputs. He also provided the City
with transportation planning support for a series of
major traffic studies. The support was performed
between January 2014 and June 2016.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Shipley serves as an Engineer for Iteris’ Mobility Consulting Solutions division and has been with the firm since April 2017. His six years of experience includes working in the fields of Traffic Engineering and Operations and ITS Systems Engineering. Mr.

Shipley has also been involved in a yearlong research project with Dr. Wilfred Recker, a Professor of Transportation Engineering at the University of California, Irvine. Mr. Shipley’s software knowledge includes AutoCAD, MicroStation, Synchro, TransModeler, HCS 2010 and TransCAD.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP – City of La Habra, CA
Mr. Shipley serves as a Project Engineer on this signal synchronization project for City of La Habra. Project includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project.

Iteris will conduct all engineering, construction management, inspection, and administrative tasks necessary to complete the project. After the construction and implementation phase of the project, Iteris will provide operations, and maintenance services for three years. The project began in March 2023 and is expected to be completed March 2028.

Marguerite Parkway Traffic Signal Synchronization Project (TSSP) - City of Mission Viejo, CA
Mr. Shipley serves as Project Engineer on this Traffic Signal Synchronization project for the City of Mission Viejo. Iteris was selected to provide final design Plans, Specifications, and Estimates (PS&E) and Traffic Signal Timing upgrades for Marguerite Parkway in the City of Mission Viejo. Iteris staff evaluated different models of push buttons and made recommendations based on the city’s needs and available technology.

EDUCATION
BS, Civil Engineering, University of
California, Irvine, 2017

YEARS OF EXPERIENCE
With Iteris: 6 Total: 6

REGISTRATIONS

CORE DISCIPLINES
Traffic Engineering & Operations
ITS Planning/Design/Integration
O&M

AFFILIATIONS
American Society of Civil Engineers
(ASCE)
International Chinese Transportation
Professionals Association (ICTPA)
EVAN

SHIPLEY

ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

EVAN SHIPLEY

ENGINEER
Moving smarter, together.

Other improvements include new UPS, CCTV, EVP,
traffic signal cabinet, and fiber optic cable. Shipley
was involved in the implementation and fine-tuning
process of the timing project. He generated solutions
and feedback that the residents provided about the
corridor performance. He also wrote the before and
after study comparison report along with the final
project report. The project began in April 2017 and
was completed in October 2021.

MacArthur Boulevard Regional Traffic Signal
Synchronization Program (RTSSP) Project –
City of Irvine, CA
Mr. Shipley serves as Project Engineer on this Traffic
Signal Synchronization project for the City of Irvine.

Iteris will provide multi-jurisdictional improvements
to a 7.2 mile stretch of the corridor from the SR-55
highway ramps to Pacific Coast Highway, spanning
the Cities of Irvine and Newport Beach. The project
will retime 23 signalized intersections as well as
provide traffic signal equipment upgrades. Mr.

Shipley was involved in the basic timing parameter
generation and designed the proposed Synchro
networks for implementation. He is also
coordinating the “before” study portion of the
project. The project began in May 2020 and is
ongoing.

Bayside Drive Improvement Project – City of
Newport Beach, CA
Mr. Shipley serves as a staff engineer for Iteris,
acting as a subconsultant for Mark Thomas &
Company, Inc., providing traffic engineering support.

Mr. Shipley performed a field inventory for the
project and visual inspection of existing equipment
along Bayside Drive. Mr. Shipley designed the traffic
signal upgrade at the Jamboree Road and Bayside
Drive intersection and the pedestrian crossing signal
located along Bayside Drive. When the project was
constructed, he developed as-built plans to submit
to the City. This project began in September 2017
and was completed in June 2019.

Katella Avenue Traffic Signal Synchronization
Project, Orange County Transportation Authority
(OCTA) – Orange County, CA
Mr. Shipley serves as Project Engineer for this Traffic Signal Synchronization project. This project provided
infrastructure upgrades and new timing to 73 signals
located across 9 different agencies in Orange
County, CA. Mr. Shipley was involved in site visits to
confirm the existing infrastructure and equipment.

He was the design lead for the ITS upgrades in the
City of Anaheim. He helped with construction
support and generated as-builts from the
contractor’s notes when the construction phase of
the project was finished. This project began in April
2019 and is ongoing.

LADOT-Caltrans District 7 On-Call, Task Order
3– Los Angeles County, CA
Mr. Shipley serves as Project Engineer on this project
to rehabilitate three segments of California State
Route 2 in the City of Los Angeles. Iteris was
responsible for the electrical and traffic signal design portion of the project, which included installing new
accessible pedestrian push button systems and new
safety lighting. New curb ramps were designed by
HNTB, necessitating the relocation of numerous
pedestrian push button systems to remain MUTCD
compliant. Also, new pedestrian crosswalk signals
were installed, which included six (6) HAWK signals
and seven (7) RRFBs. Mr. Shipley helped lead several
days of field work to gather information on the
existing conditions to aid in the design. He was one
of the design leads for the traffic signals upgrades
and assisted others with the pedestrian signal design
and street lighting design. This project began in
August 2021 and is ongoing.

San Bernardino Valley Coordinated Traffic
Signal System (SBVCTSS), San Bernardino
County Transportation Authority (SBCTA) – San
Bernardino County, CA
Mr. Shipley serves as a Project Engineer on this
project to assist 16 local agencies within the San
Bernardino Valley area to help improve congestion
along several major corridors. He has performed a
traffic signal cabinet inventory to document the
existing communication equipment. Mr. Shipley
assisted with the generation of basic timing
parameters for 87 intersections within San
Bernardino project area as well as creating the base
Synchro file to use in analysis. He also analyzed
turning movement counts to generate the ideal cycle
length for several corridors across the greater San
Bernardino County area. The project began in
January 2017. Mr. Shipley’s involvement on the
project began in November 2017 and concluded in
November 2019. The project was completed in
December 2023.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Lavezzari serves as an Associate Engineer for Iteris’ Mobility Consulting Solutions division and has been with the firm since April 2016. He has over seven years of experience working in Traffic Engineering and System Design. Mr. Lavezzari has provided support on various Intelligent Transportation Systems (ITS) projects by performing field inventory, generating base AutoCAD design plans, and drafting summary reports of the field data collected. Mr.

Lavezzari’s software knowledge includes AutoCAD, MicroStation and Synchro.

PROJECT EXPERIENCE
Traffic Signal Reconstruction on Vermont at Redondo Beach Boulevard and at Rosecrans Avenue – City of Gardena, CA Mr. Lavezzari serves as Staff Engineer on this Traffic Signal Reconstruction project for the City of Gardena. The project consisted of a traffic analysis of the two project intersections:

Vermont Ave at Redondo Beach Boulevard and Vermont Avenue and Rosecrans Avenue. The traffic analysis made specific recommendations to both intersections which mainly consisted of traffic signal upgrades, ADA ramp upgrades and pavement repairs.

The project also consists of coordination with the City of Los Angeles and United Pacific Railroad. Once construction begins, Iteris will be under contract for construction management and inspection. The project began in September 2018 and with the design concluding in October 2019.

I-405 Design-Build Improvement Project, Orange County
Transportation Authority (OCTA) – Orange County, CA
Mr. Lavezzari serves as a Staff Engineer for Iteris, acting as a subconsultant of a multidisciplinary design and construction team, on this $1.2 billion dollar design build project in Orange County California. The project will improve 16 miles of the I-405 between the SR-73 freeway in Costa Mesa and the I-605 near the Los Angeles County line. The project includes adding one regular lane in each direction from Euclid Street to I-605, making improvements to freeway entrances, exits and bridges, and will also implement Express Lanes that expands the existing HOV lane from one lane to two lanes in each direction from SR-73 to I-605.

EDUCATION
BS, Civil Engineering, University of
California, Irvine, 2016

YEARS OF EXPERIENCE
With Iteris: 7 Total: 7

CORE DISCIPLINES
Traffic Engineering & Operations
ITS Planning/Design/Integration
Transit
O&M

AFFILIATIONS
American Society of Civil Engineers
(ASCE)
Institute of Transportation Engineers
(ITE)
Orange County Traffic Engineering
Counsel (OCTEC)
DELBERT SMITHLAVEZZARI

ASSOCIATE ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

DELBERT SMITH-LAVEZZARI

ASSOCIATE ENGINEER
Moving smarter, together.

Iteris is responsible for the design of the Caltrans ITS field infrastructure, temporary ITS field infrastructure supporting maintenance of traffic during construction,
toll system infrastructure and coordination, street
lighting, agency traffic signal improvements along the
corridor and development of the project Traffic
Management Plan. Mr. Lavezzari specifically provides
engineering services such as signal design, TMS, and
tolling design. The Design project began in January
2017 and was completed in December 2019.

Construction was completed in October 2023.

Euclid Street Corridor Project Regional Traffic
Signal Synchronization Program (RTSSP – City
of La Habra, CA
Mr. Lavezzari serves as Project Engineer on this
signal synchronization project for City of La Habra.

Project includes the synchronization of sixty-seven
(67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton,
Anaheim, Garden Grove, Santa Ana, and Fountain
Valley along Euclid Street. Iteris is providing
communication system analysis for the City of
Fullerton and the City of Santa Ana through this
project. Iteris will conduct all engineering,
construction management, inspection, and
administrative tasks necessary to complete the
project. After the construction and implementation
phase of the project, Iteris will provide operations,
and maintenance services for three years. The
project began in March 2023 and is expected to be
completed March 2028.

Regional Traffic Signal Synchronization Program
(RTSSP) Project for Tustin Avenue - Rose Drive
– City of Orange, CA
Mr. Lavezzari serves as Staff Engineer on this project.

He is responsible for Existing conditions/equipment
inventory. Under the project agreement, Iteris will
make infrastructure upgrades, signal coordination
and timing improvements, develop signal timing
plans for all signalized intersections along the
corridor, provide vehicle turning movement counts
and perform before-and-after corridor analysis along
the Tustin Avenue/Rose Drive corridor from First
Street in the City of Tustin to Wabash Avenue in the
City of Yorba Linda. The project area comprises 54
signalized intersections spanning six cities – Tustin,
Santa Ana, Anaheim, Orange, Placentia, and Yorba
Linda – as well as key highway on/off ramps under
Caltrans, in Orange County, California. The project
started in August 2020 and is ongoing. Construction
is slated to start in Summer 2023.

Professional Design and Construction Support
for the TSS for ATMS – City of Rancho
Cucamonga, CA
Mr. Lavezzari serves as Staff Engineer on this project, which is currently in the O&M phase. He is
responsible for Existing conditions/equipment
inventory. Controller Integration and fiber network
upgrades. This project prepared coordination timing
plans, design plans of traffic signal modification and
interconnect system upgrades. During construction,
Iteris provided construction support and integration
services. The primary goal of this project was to
deploy new intelligent transportation system (ITS)
communication infrastructure to support the
management of the city’s transportation network,
implement optimized coordination timing plans to
achieve optimal traffic flow, and improve safety for
all road users, including vehicles, buses, bicycles, and pedestrians. The project began in August 2019 and is
currently in O&M until July of 2024.

Traffic and Intelligent Transportation Systems
Engineering Services, Main Street Regional
Traffic Signal Synchronization Projects
(RTSSP), Orange County Transportation
Authority (OCTA) – Orange County, CA
Mr. Lavezzari serves as Staff Engineer. He is
responsible for the Monthly O&M Report Lead. Under
this project agreement, which will provide services
that will upgrade traffic signal electronics and
communications equipment, and optimize signal
timing along Main Street, a major north-south
corridor that comprises 67 major signalized
intersections. As part of the project, Iteris’
Intersection-as-a-Service™ end-to-end solution
offering will deliver proactive monitoring of traffic
signal operations at all project intersections. The
primary goal of this project is to deploy new
Intelligent Transportation System (ITS) equipment
and communication infrastructure to support the
management of the cities’ transportation network,
implement optimized coordination timing plans to
achieve optimal traffic flow, and improve safety for
all road users, including vehicles, buses, bicycles, and pedestrians. The project began December 2019 and
the O&M phase will be completed in June 2023.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Ms. Fernandez serves as a Assistant Engineer for Iteris’ Consulting Solutions division and has been with the firm since June 2023. She has over 1 years of experience working in the fields of traffic and general civil projets.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP) – City of La Habra, CA
Ms. Fernandez serves as an Assistant Engineer on this signal synchronization project for City of La Habra. Project includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris will conduct all engineering, construction management, inspection, and administrative tasks necessary to complete the project. The project began in March 2023 and is expected to be completed March 2028.

Pasadena Traffic Management Center (TMC) Staffing for
Special Events – City of Pasadena, CA
Ms. Fernandez serves as one of the Project Engineers responsible for staffing special events at the City of Pasadena’s TMC. Iteris serves as an extension of City staff in the TMC during special events at the Rose Bowl, such as UCLA football home games, concerts, festivals, soccer games, and the Rose parade and game during the New Year.

Iteris monitored traffic in and out of the Rose Bowl in the TMC and occasionally in the field and confirmed that the appropriate event timing plans were in operation as programmed; adjusted necessary timing based on observations and as requested by the field officers; and conducted other timing tasks as directed by City staff in between the inbound and outbound peaks. The project began in July 2015 and is scheduled to be completed August 2024. .

EDUCATION
BS, Civil Engineering, California
Polytechnic State University, Pomona, CA,
2023

YEARS OF EXPERIENCE
With Iteris: <1 Total: 1

REGISTRATIONS
Engineer-In-Training (EIT)
CA #180469, 2023

CORE DISCIPLINES
Planning & Design
Traffic Signal Design

AFFILIATIONS
Chi Epsilon
Orange County Traffic Engineering
Council (OCTEC)
CIERA

FERNANDEZ, EIT ASSISTANT ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

CIERA FERNANDEZ, EIT

ASSISTANT ENGINEER
Moving smarter, together.

Santa Clara Changeable Message Sign (CMS)
Project – Santa Clara, CA
Ms. Fernandez is serving as Project Engineer for this
ITS Planning and Design Project for the City of Santa
Clara. This project will install eight Changeable
Message Signs (CMS) along the adjacent arterial
streets to Levi’s Stadium allowing for the diversion of traffic to be routed into or out of the Stadium
efficiently. Ciera is responsible for assisting in the
QA/QC of the Plans, Specifications and Estimates
(PS&E) package. The project began in March 2017
and is scheduled to be completed in December 2024.

Redondo Beach Boulevard Arterial
Improvements Project – City of Gardena, CA
Ms. Fernandez is serving as Project Engineer to
provide design services for this Traffic Signal
Modification Project. This project will install new
traffic signal equipment at nine (9) project
intersections along Redondo Beach Boulevard. Ciera
is responsible for preparing design plans and cost
estimate to complete the PS&E package. The design
includes traffic signal improvements, and signing and
striping modifications at each intersection. The
project began in July 2022 and is scheduled to be
completed December 2024.

Western Avenue Traffic Flow Improvements
Project – City of Rancho Palos Verdes, CA
Ms. Fernandez is serving as Project Engineer for this
this Traffic Study of Western Avenue to enhance
safety and traffic flow. Ciera is responsible for
assessing the existing ITS infrastructure of 15
intersections as well as documenting inventory of
cabinet and signal pole equipment. The project
began in May 2023 and is scheduled to be
completed March 2024.

Walnut Street Corridor Signal Improvement
Project – City of Pasadena, CA
Ms. Fernandez is serving as Project Engineer for
this Traffic Signal Modification Project. Ciera is
responsible for preparing design plans and cost
estimate to complete the PS&E package. The design
installs traffic signal improvements at nine
intersections as well as fiber optic communication in
existing and new conduit along the corridor. These
improvements include installing upgraded
controllers, CCTV cameras and cabinets. The project
began in December 2022 and is scheduled to be
completed October 2023.

Mid City Signal Synchronization Project – City of
Long Beach, CA
Ms. Fernandez is serving as Project Engineer for
this signal synchronization project for the City of
Long Beach. This project will install traffic signal
hardware at 41 intersections and communication
enhancements along 8 ½ mile of multiple corridors.

Ciera is responsible for field review, and preparing
Traffic Signal and Communication Design plans in the
PS&E package. These designs include the installation
of fiber optic communication, traffic signal upgrades
and pedestrian upgrades while attempting to
minimize construction costs. The project began in
December 2022 and is scheduled to be completed
October 2023.

PREVIOUS PROJECT EXPERIENCE
Various Slurry Seal and Aram Resurfacing
Projects – City of Garden Grove, CA
Ms. Fernandez served as an Intern since 2022. She
provided the following traffic engineering services:
• Driveway Improvements Plan for two driveways
for a trailer community to respond to a
community ADA compliance request.
• Multiple Striping and Slurry Seal Plans.
• Traffic Control Plans for Garden Grove Blvd.
from the 22 Freeway to Beach Blvd.

Various Residential Streets Reconstruction 2023
– City of Garden Grove, CA
Ms. Fernandez served as an Intern since 2022. She
provided the following Plans, Specifications and
Estimates (PS&E) services:
• Grading Plan and Profiles.
• Quantity Calculations.
• Specification Assembly and Revision.
• Developing Right-of-Entry Notice and Exhibits
for Identified APN Owners.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Liang serves as Associate Engineer for Iteris’ Mobility Consulting Solutions and has been with the firm since 2019. He has over 4 years of experience working in the fields of Traffic Engineering, ITS Designs, and Operations. Mr. Liang has ITS design experience with multiple TSSP projects around Orange County. Mr. Liang has prepared many PS&E packages for various local agencies and Caltrans in the Southern California Region. Mr. Liang’s software knowledge includes AutoCAD, Microstation, Microsoft Word, Excel, MATLAB, Synchro and ArcGIS.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING
Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP – City of La Habra, CA
Mr. Liang serves as a Project Engineer on this signal synchronization project for City of La Habra. Project includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project. Iteris will conduct all engineering, construction management, inspection, and
administrative tasks necessary to complete the project. After the construction and implementation phase of the project, Iteris will provide operations, and maintenance services for three years. The project began in March 2023 and is expected to be completed March 2028.

Traffic and Intelligent Transportation Systems Engineering Services, Katella Avenue (TSSP), Orange County
Transportation Authority (OCTA) – Orange County, CA
Mr. Liang served as Assistant Designer on this Project. As part of the project, Iteris’ Intersection-as-a-Service™ end-to-end solution offering will deliver proactive monitoring of traffic signal operations at all project intersections.

EDUCATION
BS, Civil Engineering, University of Irvine,
CA, 2019

YEARS OF EXPERIENCE
With Iteris: 4 Total: 4

REGISTRATIONS
Engineer-In-Training (EIT)
CA #169619, 2019

CORE DISCIPLINES
Traffic Engineering & Operations
ITS Planning/Design/Integration
Traffic Signal Design
Operations and Maintenance

AFFILIATIONS
American Society of Civil Engineers
(ASCE)
Orange County Traffic Engineering
Council (OCTEC)

RAYMOND

LIANG, EIT

ASSOCIATE ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

RAYMOND LIANG, EIT

ASSOCIATE ENGINEER
Moving smarter, together.

The primary goal of this project is to deploy new
Intelligent Transportation System (ITS) equipment
and communication infrastructure to support the
management of the cities’ transportation network,
implement optimized coordination timing plans to
achieve optimal traffic flow, and improve safety for
all road users, including vehicles, buses, bicycles, and pedestrians. The project began in February 2020 and
is ongoing.

Brookhurst Regional Traffic Signal
Synchronization Project (RTSSP), Orange
County Transportation Authority (OCTA) –
Orange County, CA
Mr. Liang serves as the assistant engineer to provide
traffic signal/ITS equipment upgrade and signal
synchronization along Brookhurst Street. His
responsibilities includes drafting communication
plans and addressing comments and updates. This
project consists of 45 study intersections along a 10-
mile stretch in the cities of Santa Ana, Costa Mesa,
Newport Beach and Caltrans. Fiber-optic cables will
be installed at various segments of the corridor to
close the communication gap. Many intersections
will be upgraded with new controllers, cabinets,
service, Emergency Vehicle Preemptions (EVP) and
Closed-Circuit Television (CCTV). The project egan in
July 2018 and will complete in December 2019,
followed by two years of Operations and
Maintenance (O&M).

Professional Design and Construction Support
for the TSS for ATMS – Rancho Cucamonga,
CA
Mr. Liang serves as the assistant engineer to deploy
new ITS communication infrastructure and
implement optimized coordination timing plans to
achieve optimal traffic flow for City of Rancho
Cucamonga along the main corridors of Haven
Avenue and Foothill Boulevard. CCTV, VDS, and fiber
optic interconnect upgrades will be implemented
throughout the main corridors. His responsibilities
includes drafting the fiber communication plans and
signal modification plans. The project began in
August 2019. Mr. Liang’s involvement on the project
began in August 2019 and is ongoing. The project
will be completed in August 2020, followed by two
years of Operations and Maintenance (O&M), was
completed in August 2022.

Traffic and Intelligent Transportation Systems
Engineering Services, Main Street Regional
Traffic Signal Synchronization Projects
(RTSSP), Orange County Transportation
Authority (OCTA) – Orange County, CA
Mr. Liang serves as Associate Engineer on this
project, which will provide services that will upgrade
traffic signal electronics and communications
equipment, and optimize signal timing along Main
Street, a major north-south corridor that comprises
67 major signalized intersections. As part of the
project, Iteris’ Intersection-as-a-Service™ end-to-end
solution offering will deliver proactive monitoring of
traffic signal operations at all project intersections.

The primary goal of this project is to deploy new
Intelligent Transportation System (ITS) equipment
and communication infrastructure to support the
management of the cities’ transportation network,
implement optimized coordination timing plans to
achieve optimal traffic flow, and improve safety for
all road users, including vehicles, buses, bicycles, and pedestrians. The project began in December 2019
and is ongoing.

A&E On-Call Roadway Design and Project
Development and Construction Services
(Caltrans D12) – Orange County, CA
Mr. Liang is serving as an Assocate Engineer with
Iteris as part of the TranSystems team on the
Caltrans District 12 On-Call contract to provide
consultation, research, professional and technical
services required for Roadway Design and related
Project Development and Construction Services,
including, but not limited to, field sampling,
construction materials testing, analysis, reports,
plant inspection and work related to testing
equipment calibration, on an “as-needed” basis to
support the Caltrans D12, from Project Report phase
to construction phase completion of three State
Route (SR) 91 Multi-Asset Projects, EA 12-0R312, EA
12-0R313 and EA 12-0R314 in Orange County
between Los Angeles County Line to Riverside
County Line. Iteris' task focuses on performing
design service for Traffic Management Systems
(TMS) and electrical elements through PA&ED, PS&E
and construction phase. The TMS/electrical
elements improvement includes, but not limited to,
CCTV, CMS, loop detectors, census station, RMS, FOC
and conduit. The project began in January 2021 and
is ongoing.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Ingoglia serves as Engineer of Iteris’ Mobility Consulting Solutions division and has been with the firm since April 2017. Mr.

Ingoglia has over 6 years of experience in the fields of Traffic Signal Operations, Signal Timing & Coordination, Intelligent Transportation Systems (ITS) planning, design, and integration, Traffic Engineering & Design, and Municipal Traffic Engineering. His project experience includes preparing and implementing signal timing and
synchronization, operational analysis, installing ITS and communication equipment, preparing signing and striping plans as well as reviewing traffic studies and traffic control plans. Mr.

Ingoglia has knowledge in signal timing, Intelligent Transportation Systems (ITS), electrical systems, and integration. Mr. Ingoglia is proficient in the use of design and traffic analysis software such as AutoCAD, MicroStation, and Synchro.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Euclid Street Corridor Project Regional Traffic Signal
Synchronization Program (RTSSP – City of La Habra, CA
Mr. Ingoglia serves as a Project Engineer on this signal synchronization project for City of La Habra. Project includes the synchronization of sixty-seven (67) traffic signals and sixty-nine (69) offset traffic signals throughout the Cities of La Habra, Fullerton, Anaheim, Garden Grove, Santa Ana, and Fountain Valley along Euclid Street. Iteris is providing communication system analysis for the City of Fullerton and the City of Santa Ana through this project.

Iteris will conduct all engineering, construction management, inspection, and administrative tasks necessary to complete the project. After the construction and implementation phase of the project, Iteris will provide operations, and maintenance services for three years. The project began in March 2023 and is expected to be completed March 2028.

EDUCATION
BS, Civil Engineering, , California State
Polytechnic University, Pomona, 2017

YEARS OF EXPERIENCE
With Iteris: 3 Total: 6

REGISTRATIONS
Engineer-In-Training (EIT)
CA #160812, 2017

CORE DISCIPLINES
Traffic Signal Operations
Signal Timing & Coordination
ITS Planning, Design, & Integration
Traffic Engineering & Design
Municipal Traffic Engineering

AFFILIATIONS
Institute of Transportation Engineers
(ITE)
Orange County Traffic Engineering
Council (OCTEC)
ALEX

INGOGLIA

ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

ALEX INGOGLIA

ENGINEER
Moving smarter, together.

Traffic and Intelligent Transportation Systems
Engineering Services, Katella Avenue, Orange
County Transportation Authority (OCTA) –
Orange County, CA
Mr. Ingoglia serves as Project Engineer on this
Project and participated in the timing
implementation and finetuning in the field or
through TMC central program for each city.

Additionally, Mr. Ingoglia installed installed edge
switches at project intersections to provide
communication to the traffic controllers. As part of
the project, Iteris’ Intersection-as-a-Service™ end-toend solution offering will deliver proactive monitoring of traffic signal operations at all project
intersections. The primary goal of this project is to
deploy new Intelligent Transportation System (ITS)
equipment and communication infrastructure to
support the management of the cities’
transportation network, implement optimized
coordination timing plans to achieve optimal traffic
flow, and improve safety for all road users, including
vehicles, buses, bicycles, and pedestrians. The
project began in February 2020 and was completed
in June 2023.

Culver Drive Regional Traffic Signal
Synchronization Program (RTSSP) Project –
City of Irvine, CA
Mr. Ingoglia serves as Project Engineer on this traffic signal synchronization project and assisted with the
development of the optimized synchronization
timing and lead the implementation of the new
timing. Mr. Ingoglia also assisted with preparing of
the before study.

Lake Forest Traffic Engineering Services – City
of Lake Forest, CA
Mr. Ingoglia is serving as Project Engineer and
monitors the operations and communication of all
traffic signals within the City of Lake Forest.

Additionally, Mr. Ingoglia investigates City Staff and
resident concerns about signal timing and makes
timing adjustments due to construction activities.

SBCTA San Bernardino Valley Coordinated
Traffic Signal System Project – San Bernardino
County, CA
Mr. Ingoglia serves as Project Engineer and is
assisting on the semi-annual assessment, created
the Synchro network, and performed a basic signal
timing analysis of a $3M project to assist 16 local
agencies within the San Bernardino Valley area to
improve traffic progressions along many key regional
corridors. The project consists of four main
components: First, develop traffic signal
coordination master plans for five different subregions within the Valley. The Master Plan will serve as a roadmap for all future signal coordination in the
Valley. Second, update signal coordination timings
for over 500 traffic signals with a goal of reducing
travel times, delays and GHG emissions. Third,
conduct assessments of all the signal
synchronization corridors and traffic signals to
ensure they are all performing well and as planned
on a semi-annual basis. Fourth, provide system
support services to assist any agencies in resolving
technical issues, e.g. signals offline due to lost
communications. As part of this project, an ITS
network management software called NetScene will
be installed at local agencies’ servers to help monitor their ITS field devices in real time, which is a great
tool for identifying field issues instantly so proper
resources can be allocated to address the problems.

The project began in January 2017 and is ongoing.

Laguna Woods Traffic Engineering Services City
of Laguna Woods, CA
Mr. Ingoglia is serving as Project Engineer
monitoring City’s central traffic system. Iteris has
been providing traffic engineering services to the
City of Laguna Woods since 2012 to operate and
maintain all the traffic signals within the City.

Services provided include:
• Monitor and operate all traffic signals
within the City via the Econolite Centracs
traffic signal system
• Design golf-cart push buttons at 3
intersections
• Recommend operational improvements for
two signalized intersections with split-phase
operations
• Coordinate with OCTA for the recently
implemented El Toro Road TLSP and
Moulton Parkway TLSP projects.
• Attend OCTA ITS Roundtable meetings
• Address resident complaints on various
traffic engineering and roadway lighting
matters
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Moving smarter, together.

Mr. Luo serves as an Assistant Engineer for Iteris’ Mobility Consulting Solutions division and has been with the firm since 2022. He has over 1 year of experience working in the field of Traffic Engineering & Operations. His project experience includes preparing traffic signal coordination timing plans. Mr. Luo is proficient in the use of design and traffic analysis software such as AutoCAD, Synchro, Vissim, and Transync.

PROJECT EXPERIENCE

TRAFFIC ENGINEERING & OPERATIONS
Kinetics Upgrade for City of Chino, San Bernardino Valley Coordinated Traffic Signal System (SBVCTSS) Signal
Coordination – San Bernardino Valley, CA
Mr. Luo served as project engineer on this project to upgrade the City of Chino’s traffic management system from Maxview to Kinetics.

Richard modeled and reviewed 77 intersections into Kinetics and worked with the city to move the signals from Maxview into the new system. The upgrade to Chino’s system was a part of the SBVCTSS project that began in January 2017 and was completed in January 2023.

Lake Forest Traffic On-Call – Lake Forest, CA
Mr. Luo serves as a project engineer on this project. Under this project, Richard provides support to the City regarding any issues with the traffic signals. Support includes responding to residents’ inquiries, observing field conditions, and updating information within controllers. The project began in July 2021 and is expected to finish Ain June 2024.

Traffic Signal Retiming at 99 Locations – City of Chula Vista, CA
Mr. Luo is serving as a project engineer. The purpose of this project is to deploy optimized signal timing plans within a project network of 99 signalized intersections located in Eastern Chula Vista. Richard reviewed and updated basic timing parameters for all 99 intersections. He has also developed a Synchro model of the 99 intersections with the existing conditions. He then identified critical intersections, determined zoning of intersections, and proposed new cycle lengths. The project began in March 2022 and is ongoing.

EDUCATION
BS, Civil and Environmental Engineering,
University of Nevada Reno, 2019
MS, Civil and Environmental Engineering,
University of Nevada Reno, 2022

YEARS OF EXPERIENCE
With Iteris: <1 Total: 1

REGISTRATIONS
Engineering-in-Training (EIT/EI)
Engineering-in-Training (EIT/EI)
NV #0T8118, 2019

CORE DISCIPLINES
Traffic Engineering & Operations

RICHARD

LUO, EIT

ASSISTANT ENGINEER
Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122

RICHARD LUO

ASSOCIATE ENGINEER
Moving smarter, together.

Katella Avenue Regional Traffic Signal
Synchronization Project (RTSSP) – Orange
County, CA
Mr. Luo serves as a project engineer on this project
which extends through Cities of Anaheim, Cypress,
Garden Grove, Los Alamitos, Orange, Stanton, Villa
Park in Orange County. This project includes signal
coordination and timing improvements as well as ITS
equipment upgrades. Richard has conducted travel
runs and written the monthly O&M reports to
monitor and maintain the performance of the
corridor following the implementation of the new
timing in May 2022. The project began in February
2020 and O&M is ongoing.

Culver Drive/Bonita Canyon Drive/Ford Road
Regional Traffic Signal Synchronization Program
(RTSSP) – Irvine, CA
Mr. Luo serves as a project engineer on this project
for the City of Irvine. The project scope includes
optimizing traffic signal synchronization timing plans
for 39 intersections along the 11-mile Culver Drive
corridor. The project covers intersections owned by
the City of Irvine, City of Newport Beach, and
Caltrans. Richard implemented and fine-tuned the
new timing for the proposed intersections. The
project began in June 2019 and is ongoing.

Brea Signal Adaptive System – Brea, CA
Mr. Luo serves as a project engineer on this project
for the City of Brea. The project scope included
providing engineering services for installation,
integration, and monitoring of the selected adaptive
traffic signal control system in the City of Brea.

Richard has monitored the system on a quarterly
basis through Bluetooth data and travel runs.

Changes to signal timing have been made to
maintain or improve performance. The project
began in October 2022 and is expected to finish in
January 2023.

EVENT MANAGEMENT
Traffic Management Center (TMC) Staffing – City
of Pasadena, CA
Mr. Luo served as staff for the City of Pasadena’s
traffic management center. Iteris was contracted to
serve as an extension of the City’s TMC staff during
the weekend and holiday events. The goal of the
project was to bring together all participants
involved in managing traffic during large influxes in
and out of the City during special events in the
downtown area. TMC support is ongoing.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Only Iteris is built to deliver the next era of
smart mobility. Combining the power of cloud
technology with decades-long relationships
and deep industry expertise, we are at the
center of a growing ecosystem: breaking down
traditional barriers to unify mobility infrastructure,
accelerate transformation, and enable a smarter
future, together.
iteris.com
Iteris. Moving smarter, together.

Docusign Envelope ID: 8227E5D7-1338-4AB0-A7C2-6FD517231122 Consultant Agreement with JMDiaz, Inc Page 1

CITY OF GARDENA

CONSULTANT AGREEMENT WITH JMDIAZ, INC
This Agreement is entered into this 10th day of September, 2024, by and between the City of Gardena, a municipal corporation (“City”) and JMDiaz, Inc, a CA Corporation (“Consultant”). Based on the mutual promises and covenants contained herein, the Parties hereto agree, as follows.

1. RECITALS. This Agreement is made and entered into with respect to the following facts:

A. Whereas, City is desirous of obtaining the as-needed professional on-call consultant services in the following category or categories:
• Traffic Engineering

B. Whereas, Consultant has represented that it is qualified by virtue of experience, training, education and expertise to accomplish these services; and
C. Whereas, City has determined that the public interest, convenience and necessity require the execution of this Agreement; and
D. Whereas, no official or employee of City has a financial interest, within the provisions of sections 1090-1092 of the California Government Code, in the subject matter of this Agreement.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows:

2. TERM OF AGREEMENT. This Agreement shall commence upon execution and shall continue until September 9, 2027 (3-yr term), with an option to extend for one additional two-year at City’s discretion, unless earlier terminated as provided below.

A. Either party may terminate this Agreement, without cause, by giving thirty (30) days written notice to the other party.

B. City may terminate this Agreement for cause by giving thirty (30) days written notice to Consultant. Lack of funding shall be considered cause for terminating this Agreement.

C. Upon termination, Consultant shall: (1) promptly discontinue all services affected, unless the notice directs otherwise; and (2) promptly deliver to City all data, reports, estimates, summaries, and such other information and materials as may have been accumulated or prepared to date by Consultant in performing the services under this Agreement, whether completed or in progress. Consultant shall be entitled to reasonable compensation for the Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 2
services it performs up to the date of termination; however, if the Agreement is terminated by City for cause, other than lack of funding, or by Consultant without cause, City shall be entitled to deduct any costs it incurs payment to another consultant for Services, which duplicate Consultant’s Services to date. In the event of termination for other than cause attributable to Consultant, Consultant shall be deemed released for liability for any work assigned but not completed as of the effective date of termination.

3. SERVICES. Consultant agrees to provide the services as specified in the City’s Request for Qualification (“RFQ”), Exhibit A, attached hereto and incorporated herein by this reference (“services”). Unless otherwise specified herein, Consultant shall, at its sole cost and expense, furnish all facilities, equipment and personnel which may be required for providing the Services pursuant to this Agreement.

4. ADDITIONAL SERVICES. If City determines that additional services are required to be provided by Consultant in addition to the Services set forth above, City shall authorize Consultant to perform such additional services in writing (“Additional Services”). Such Additional Services shall be specifically described and approved by City in writing prior to the performance thereof. Consultant shall be compensated for such Additional Services in accordance with the agreed upon charges therefore as set forth in the written authorization. No compensation shall be paid to Consultant for Additional Services which are not specifically approved by City in writing.

5. CONSULTANT’S PROPOSAL. This Agreement shall include Consultant’s Response to City’s RFQ, also known as the Statement of Qualifications (SOQ), which is incorporated herein as Exhibit B. In the event of any inconsistency between the terms of the proposal and this Agreement, it shall be resolved by giving precedence in the following order: (a) The Agreement (b) Exhibit A (c) Exhibit B.

6. PERSONNEL. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall provide properly skilled professional and technical personnel to perform all services under this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Consultant to perform Services pursuant to this Agreement, Consultant shall remove any such person immediately upon receiving notice from City. During the term of this Agreement, Consultant shall provide the services specified in the proposal. Such individual(s) shall not be replaced without the prior written consent of City.

7. PERFORMANCE BY CONSULTANT. Consultant shall maintain or exceed the level of competency presently maintained by other similar practitioners in the State of California, for professional and technical soundness, accuracy and adequacy of all work, advice and material furnished under this Agreement.

8. TIMING OF PERFORMANCE. Time is of the essence with respect to Consultant’s performance of the Services required by this Agreement. Consultant shall diligently and timely pursue and complete the performance of the Services required of it by Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 3
this Agreement. City, in its sole discretion, may extend the time for performance of any Service.

9. MONITORING OF CONSULTANT. Consultant’s performance of this Agreement shall be continuously monitored by the Public Works Director/City Engineer.

Consultant shall be notified in writing of any deficiency in the performance of this Agreement in a timely manner by the Public Works Director/City Engineer.

Consultant shall have five (5) business days from receipt of the notification to cure any deficiency to the reasonable satisfaction of the Public Works Director/City Engineer. All costs for such corrections shall be borne by Consultant and shall not increase Consultant’s fees due hereunder. Should the Public Works Director/City Engineer determine that Consultant has not performed its obligation as stated in this Agreement in a satisfactory manner, City may terminate this Agreement for cause as specified in Section 2 above.

10.COMPENSATION. Consultant shall be compensated as follows:

A. Amount. City shall compensate Consultant for services rendered pursuant to this Agreement at the rate specified in the attached fee schedule set forth in Exhibit B. Consultant’s total compensation shall be based on each proposal the consultant submits and the City accepts for the services requested on a particular project.

B. Invoices and Payment. Payment by City to Consultant shall be made upon receipt and approval of invoices for Services rendered. For payment to be made, Consultant’s invoice must include an itemization as to the services rendered, date(s) of service, direct and/or subcontract costs and be submitted on an official letterhead or invoice with Consultant’s name, address, and telephone number referenced. City shall review the invoices to determine whether services performed, and documents submitted are consistent with this Agreement. Payment shall be made within forty-five (45) days following receipt of the invoice or City shall provide Consultant with a written statement objecting to the charges and stating the reasons therefor.

Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to City at the time of payment.

C. Expenses. Consultant shall not be entitled to any additional compensation for expenses.

11.INSURANCE REQUIREMENTS.

A. Commencement of Work. Consultant shall not commence work under this Agreement until it has obtained City approved insurance. Before beginning work hereunder, during the entire period of this Agreement, for any extensions hereto, and for periods after the end of this Agreement as may be indicated below, Consultant must have and maintain in place all of the insurance coverages required in this Section. Consultant’s insurance shall comply with all items specified by this Agreement. Any subcontractors shall Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 4
be subject to all the requirements of this Section and Consultant shall be responsible to obtain evidence of insurance from each subcontractor and provide it to City before the subcontractor commences work. Alternatively, Consultant’s insurance may cover all subcontractors.

B. Insurance Company Requirements. All insurance policies used to satisfy the requirements imposed hereunder shall be issued by insurers admitted to do business in the State of California. Insurers shall have a current Best’s rating of not less than A-:VII, unless otherwise approved by City.

C. Coverages, Limits and Policy Requirements. Consultant shall maintain the types of coverages and limits indicated below:

1. Commercial General Liability Insurance – a policy for occurrence coverage for bodily injury, personal injury and property damage, with coverage at least as broad as Insurance Services Office Form CG 00 01, with no special limitations affecting City. The limit for all coverage under this policy shall be no less than one million dollars ($1,000,000.00) per occurrence.

2. Commercial Auto Liability Insurance – a policy including all coverages provided by and to the extent afforded by Insurance Services Office form CA 0001, including Symbol 1 (any auto) with no special limitations affecting City. The limit for bodily injury and property damage liability shall be no less than one million dollars ($1,000,000.00) per accident.

3. Worker’s Compensation and Employers Liability Insurance – a policy which meets all statutory benefit requirements of the Labor Code, or other applicable law, of the State of California. The minimum coverage limits for said insurance shall be no less than one million dollars per claim. The policy shall be issued by an insurance company which is admitted to do business in the State of California and shall contain a clause that the policy may not be canceled without thirty (30) days prior written notice, return receipt requested, is mailed to City.

4. Professional Errors & Omissions (“E&O”) – a policy with minimum limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Architects’ and engineers’ coverage shall be endorsed to include contractual liability.

If the policy is written as a “claims made” policy, the retro date shall be prior to the start of the contract work. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. This policy shall be issued by an insurance company which is admitted to do business in the State of California.

Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 5

5. Policy Requirements. The policies set forth above shall comply with the following, as evidenced by the policies or endorsements to the policies:
a. Additional insureds: “The City Gardena and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant.”
b. Notice: “Said policy shall not terminate, be suspended, or voided, nor shall it be cancelled, nor the coverage or limits reduced, until thirty (30) days after written notice is given to City.” c. Other insurance: “The Consultant’s insurance coverage shall be primary insurance as respects the City of Gardena, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of Gardena shall be excess and not contributing with the insurance provided by this policy.” d. Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of Gardena, its officers, officials, agents, employees, and volunteers. e. The Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

D. Additional Requirements. The procuring of such required policies of insurance shall not be construed to limit Consultant’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement.

There shall be no recourse against City for payment of premiums or other amounts with respect thereto. City shall notify Consultant in writing of changes in the insurance requirements. If Consultant does not deposit copies of acceptable insurance policies or endorsements with City incorporating such changes within sixty (60) days of receipt of such notice, Consultant shall be deemed in default hereunder.

E. Deductibles. Any deductible or self-insured retentions over $25,000 per occurrence must be declared to and approved by City. Any deductible exceeding an amount acceptable to City shall be subject to the following changes: either the insurer shall eliminate or reduce such deductibles or selfinsured retentions with respect to City, its officers, employees, agents and volunteers (with additional premium, if any, to be paid by Consultant); or Consultant shall provide satisfactory financial guarantee for payment of Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 6
losses and related investigations, claim administration and defense expenses.

F. Verification of Compliance. Consultant shall furnish City with original policies or certificates and endorsements effecting coverage required by this Agreement. The endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before work commences. Not less than fifteen (15) days prior to the expiration date of any policy of insurance required by this Agreement, Consultant shall deliver to City a binder or certificate of insurance with respect to each renewal policy, bearing a notation evidencing payment of the premium therefor, or accompanied by other proof of payment satisfactory to City. Consultant shall provide full copies of any requested policies to City within three (3) days of any such request by City.

G. Termination for Lack of Required Coverage. If Consultant, for any reason, fails to have in place, at all times during the term of this Agreement, including any extension hereto, all required insurance and coverage, City may immediately obtain such coverage at Consultant’s expense and/or terminate this Agreement.

H. Non-Limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property.

12.INDEMNIFICATION. Consultant agrees to defend, indemnify, hold free and harmless the City, its elected officials, officers, agents, employees and volunteers, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings brought against the City, its elected officials, officers, agents, employees and volunteers arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subconsultants, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subconsultants, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected officials, officers, agents, employees and volunteers based upon the work performed by the Consultant, its employees, and/or authorized subconsultants under this Agreement, whether or not the Consultant, its employees, and/or authorized subconsultants are specifically named or otherwise asserted to be liable.

Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole negligence or willful misconduct of the City. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity and defense shall be limited to the extend required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 7
recklessness, or misconduct of Consultant. This provision shall supersede and replace all other indemnity provisions contained either in the City’s specifications or Consultant’s Proposal, which shall be of no force and effect.

13.COOPERATION. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require.

14.INDEPENDENT CONTRACTOR. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City.

Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker’s compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification arising under this paragraph.

15.PERS ELIGIBILITY INDEMNIFICATION. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 8

16.NON-LIABILITY OF CITY. No official, employee, agent or volunteer of City shall be personally liable for any default or liability under this Agreement.

17.OWNERSHIP OF WORK PRODUCT. All documents or other information created, developed, or received by Consultant shall, for purposes of copyright law, be deemed works made for hire for City by Consultant as City employee(s) for hire and shall be the sole property of City. Consultant shall provide City with copies of these items upon demand, and in any event, upon termination or expiration of this Agreement.

18.CONFIDENTIALITY CLAUSE. Consultant acknowledges that some of the material and information that may come into its possession or knowledge in connection with this Agreement or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either state or federal (“Confidential Information”). Confidential Information includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver's license numbers, medical data, law enforcement records, agency source code or object code, agency security data, or information identifiable to an individual that relates to any of these types of information. Consultant agrees to hold Confidential Information in strictest confidence and not to make use of Confidential Information for any purpose other than the performance of this Agreement, to release it only to authorized employees or Sub-consultants requiring such information for the purposes of carrying out this Agreement, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make the information known to any other party without City's express written consent or as provided by law. Consultant agrees to release such information or material only to employees or Sub-consultants who have signed a nondisclosure agreement, the terms of which have been previously approved by City. Consultant agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to Confidential Information.
"Personal information" including, but not limited to, "Protected Health Information" (PHI) under Health Insurance Portability And Accountability Act (HIPAA), individuals' names, addresses, phone numbers, birth dates, and social security numbers collected, used, or acquired in connection with this Agreement shall be protected against unauthorized use, disclosure, modification or loss.

HIPAA establishes national minimum standards for the use and disclosure of certain health information. The Consultant must comply with all HIPAA requirements and rules when determined applicable by the City. If City determines that (1) City is a "covered entity" under HIPAA, and that (2) Consultant will perform "business associate" services and activities covered under HIPAA, then at City's request, Consultant agrees to execute City's Agreement in compliance with HIPAA.

Consultant shall ensure its directors, officers, employees, Sub-consultants or agents use personal information solely for the purposes of accomplishing the services set forth herein. Consultant and its Sub-consultants agree not to release, divulge, Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 9
publish, transfer, sell or otherwise make known to unauthorized persons personal information without the express written consent of the City or as otherwise required by law.

Any breach of this provision may result in termination of the Agreement and demand for return of all personal information. Moreover, Consultant will indemnify and hold the City harmless from and against all losses and damages resulting from any unauthorized or improper disclosure, dissemination or use of the information as a result, in whole or in part, of Consultant’s action or inaction.

19.NONUSE OF INTELLECTUAL PROPERTY OF THIRD PARTIES. Contractor shall not use, disclose or copy any intellectual property of any third parties in connection with work carried out under this Agreement, except for intellectual property for which Contractor has a license. Contractor shall indemnify and hold City harmless against all claims raised against City based upon allegations that Contractor has wrongfully used intellectual property of others in performing work for City, or that City has wrongfully used intellectual property developed by Contractor pursuant to this Agreement.

20.WAIVER OR BREACH. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding, unless executed in writing by the party making the waiver.

21.COMPLIANCE WITH LAWS. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers’ compensation insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys’ fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant’s performance under this Agreement.

22.CONFLICT OF INTEREST AND REPORTING. Consultant shall at all times avoid conflicts of interest or the appearance of a conflict of interest in the performance of this Agreement. If required, Consultant shall comply with the City’s Conflict of Interest reporting requirements. Consultant understands that pursuant to Gardena Municipal Code sections 2.24.020H and 2.24.025G, it is forbidden to make any contribution to a candidate or committee of a candidate for a municipal office of the City, or to an officeholder, until the completion of services to be performed under this Agreement.

23.NON-DISCRIMINATION. Consultant covenants there shall be no discrimination Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 10
based upon race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in activity pursuant to this Agreement.

24.FORCE MAJEURE. Consultant shall not be in default for failing to perform in accordance with the terms of this Agreement if such failure arises out of causes beyond the control and without the fault or negligence of Consultant.

25. ASSIGNMENT. Consultant shall not assign or subcontract any of its obligations pursuant to this Agreement, nor any part thereof, except for any monies due the Consultant, without the prior written consent of City. Such consent by City shall not be unreasonably withheld. Consultant shall be fully responsible to City for all work performed by assignees or subcontractors.

26. NOTICES. Whenever it shall be necessary for either party to serve notice on the other respecting this Agreement, such notice shall be in writing and shall be given by personal service upon the party to be notified, or by deposit of the same in the custody of the United States Postal Service, postage prepaid, addressed to the party to be notified as follows:

To City: City of Gardena
1700 West 162nd Street
Gardena, California 90247
Attn: Allan Rigg
Director of Public Works/City Engineer
To Consultant: JMDiaz, Inc
18645 East Gale, Suite 212
City of Industry, CA 91748
Attn: Juan Diaz
President/CEO
Notices shall be deemed to have been served upon the date of personal service or three (3) working days after the same has been deposited in the United States Postal Service.

27.LICENSED STATUS. Consultant shall, at all times during the term of this Agreement, have in full force and effect, all licenses required of it by law, including, but not limited to, a City Business License.

28.FAMILIARITY WITH WORK. By executing this Agreement, Consultant warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the difficulties and restrictions of the work under this Agreement. Should Consultant discover any conditions materially differing from those inherent in the work or as represented by City, it shall immediately inform City and shall not proceed, except at Consultant’s own risk, until written instructions are received from City.

29.PUBLIC RECORD ACT DISCLOSURE. Consultant has been advised and is aware Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 11
that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code section 7920.000 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code section 7924.510, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court.

30.MAINTENANCE OF RECORDS. Consultant shall maintain for a minimum of three (3) years from the completion date of the Services under this Agreement, the following records:

A. All accounts and records, including personnel, property and financial, adequate to identify and account for all costs pertaining to this Agreement and assume proper accounting for all funds;
B. Records which establish that Consultant and all subcontractors who render Services under this Agreement are in full compliance with the requirements of this Agreement and all federal, state and local laws and regulations; C. Any additional records deemed necessary by City to assume verification of full compliance with this Agreement.

D. The aforementioned records shall be made available to City or any authorized representative thereof upon request for audit.

31.BINDING EFFECT. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties hereto.

32.GOVERNING LAW. This Agreement shall be interpreted and construed according to the laws of the State of California. Any action commenced about this Agreement shall be filed in the appropriate branch of the Los Angeles County Municipal or Superior Court.

33.SECTION HEADINGS. The Section headings used in this Agreement are for reference purposes only and shall have no binding effect.

34.AUTHORITY TO EXECUTE. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement.

35.ATTORNEY’S FEES. In the event that legal action is necessary to enforce the provisions of this Agreement, or to declare the rights of the parties hereunder, the parties agree that the prevailing party in the legal action shall be entitled to recover Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 12
attorney’s fees and court costs from the opposing party.

36.PREPARATION OF AGREEMENT. Each party acknowledges that it has had an adequate opportunity to review each and every provision in this Agreement and to submit the same to counsel and other consultants for review and comment and that the parties jointly drafted this Agreement. No provision of this Agreement or any Assignment shall be construed more strictly against one party than the other party by reason that one or the other party proposed, drafted or modified such provision or any other existing or proposed provision.

37.SEVERABILITY. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.

38.ENTIRE AGREEMENT. This Agreement contains the entire understanding between City and Consultant. Any prior agreement, promises, negotiations or representations not expressly set forth herein are of no force or effect. Subsequent modifications to this Agreement shall be effective only if in writing and signed by both parties. This Agreement may be signed by the parties hereto in separate counterparts, including both counterparts that are executed on paper and counterparts that are in the form of electronic signatures. Electronic signatures include facsimile or email electronic signatures. Each executed counterpart shall be deemed an original. All counterparts, taken together, constitute the executed Agreement. If any term, condition or covenant of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall be valid and binding.

39.ELECTRONIC SIGNATURE. The parties hereby acknowledge and agree that electronic records and electronic signatures, as well as facsimile signatures, used in connection with the execution of this Agreement and electronic signatures, facsimile signatures or signatures transmitted by electronic mail in so-called pdf format shall be legal and binding and shall have the same full force and effect as if a paper original of this Agreement had been delivered and had been signed using a handwritten signature. City and Consultant (i) agree that an electronic signature, whether digital or encrypted, of a party to this Agreement is intended to authenticate this writing and to have the same force and effect as a manual signature, (ii) intend to be bound by the signatures (whether original, faxed or electronic) on any document sent or delivered by facsimile or, electronic mail, or other electronic means, (iii) are aware that the other party will reply on such signatures, and (iv) hereby waive any defenses to the enforcement of the terms of this Agreement based on the foregoing forms of signature. If this Agreement has been executed by electronic signature, all parties executing this document are expressly consenting under the United States Federal Electronic Signatures in Global and National Commerce Act of 2000 ("E-SIGN") and California Uniform Electronic Transactions Act ("UETA")(Cal. Civ. Code § 1633.1, et seq.), that a signature by fax, email or other electronic means shall constitute an Electronic Signature to an Electronic Record under both E-SIGN and UETA with respect to this specific transaction.

Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Consultant Agreement with JMDiaz, Inc Page 13
IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first hereinabove set forth.

CITY OF GARDENA CONSULTANT – JMDiaz, Inc
________________________________ _________________________________ Tasha Cerda, Mayor Name
ATTEST:

Sign:_____________________________
Title:
________________________________
Mina Semenza, City Clerk _________________________________ Name
APPROVED AS TO FORM:

Sign:_____________________________
Title:

Carmen Vasquez, City Attorney
Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA Chief Financial Officer
Juan Diaz
Chief Executive Officer
Juan Diaz
Exhibit A
Request for Qualifications (RFQ)
Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA

CITY OF GARDENA

PUBLIC WORKS DEPARTMENT

REQUEST FOR QUALIFICATIONS (RFQ)
FOR

GENERAL CIVIL ENGINEERING DESIGN, CONSTRUCTION

MANAGEMENT & INSPCTION, TRAFFIC ENGINEERING,

ARCHITECTURE AND LANDSCAPE ARCHITECTURE,

GEOTECHNICAL ENGINEERING/GEOLOGY AND MATERIAL

TESTING, AND STAFF AUGMENTATION
ON‐CALL PROFESSIONAL SERVICES:

MAY 2024
Memoranda:

Qualifications Due: Thursday, June 13, 2024, 2:00 p.m. PST.

City of Gardena Public Works Department: (310) 217‐9568 Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA

TABLE OF CONTENTS
SECTION I NOTICE OF REQUEST FOR QUALIFICATIONS…………………….…………………….. 1 SECTION II SCOPE OF SERVICES/SCOPE OF WORK………………………………….………………… 3 SECTION III SUBMITTAL REQUIREMENTS…………………………………………………….……………. 7 SECTION IV FEE SCHEDULE………………………………………………………………………..…..…………. 8 SECTION V SELECTION/EVALUATION CRITERIA…………………………………………….………….. 8 SECTION VI GENERAL CONDITIONS……………………………………………………………..……….….. 9 SECTION VII AGREEMENT AND INSURANCE……………………………………………………......….... 9 SECTION VIII APPENDIX “A” Gardena Standard Professional Services Agreement…………….……………… 10 Docusign Envelope ID: 72A03CA3-6F7A-4CA5-A0F3-F1DE871F06DA 1 | Page

SECTION I

NOTICE OF REQUEST FOR QUALIFICATIONS
On-Call Professional Engineering, Architecture, and/or Landscape Architecture Services NOTICE IS HEREBY GIVEN that the City of Gardena is requesting Statements of Qualifications (SOQ) from professional engineering, architecture, and/or landscape architecture consulting firms to provide on-call services related to our Public Works Capital Improvement Program and General Engineering. The work will be assigned on an as-needed basis for various projects in the City.

The Request for Qualifications (RFQ) provides information on the City of Gardena, the required scope of services, the consultant selection process, and the minimum information that must be included in the RFQ response. Proposals will be evaluated based on the overall best value to the City, considering factors such as quality, service, price, and any other criteria outlined herein, including but not limited to, the proposer's ability to meet the requirements, qualifications, and competencies set forth in the RFQ.

The Request for Qualifications (RFQ) can be obtained at http://www.cityofgardena.org/rfps/ Questions regarding this RFQ shall be directed to Kevin Kwak at (310) 217-9643 or [email protected].

BACKGROUND
The City of Gardena is located in the South Bay region of Los Angeles County, California, and was incorporated on September 11, 1930, as a general law city. It operates under the Council-Manager form of government. The population is approximately 62,000, occupying approximately six (6) square miles. It is primarily built-out, with a few remaining undeveloped parcels and a 9.4-acre wetland preserve, Gardena Willows Wetland Preserve. Gardena is bordered by the cities of Torrance, Hawthorne, Carson, Los Angeles (L.A.), and the County of Los Angeles, including their unincorporated areas.

The Gardena roadways are divided into three (3) major street classifications: Arterial (26.8 Centerline miles), Collector (28.7 centerline miles), and Local (57.5 centerline miles). Combined, the entire network consists of 113 centerline miles of streets with a weighted average PCI of 81.

The existing city-owned wastewater collection system comprises approximately 89 miles of gravity collection system pipes ranging from 6 to 12 inches, approximately 2,080 manholes, and one lift station and its associated force main. The collection system pipes within the City discharge to the LACSD interceptor at over 100 locations.

The existing stormwater collection system consists of approximately 29 miles of gravity pipe system (City SD = 12 miles & LA County SD = 17 miles) and 795 total catch basins (City CB = 216 & LA County CB = 579).

The collection system pipes within the City primarily discharge to the Dominguez Channel.

Lastly, note that Gardena’s water system is operated and maintained by Golden State Water.

← All documents from this meeting