Cities Index.
Agenda packet

Rancho Cordova City Council
March 21, 2022

Document
Agenda packet
Meeting
March 21, 2022
Body
Rancho Cordova City Council
Pages
1,447
Original file
335.7 MB
Text extracted from the city's file for reading and search. Open the original on ranchocordovaca.api.civicclerk.com. That file is the official record.

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 88 of 98 10455 Investment Circle FEL 1 4yd Garbage 1x per week
1 4yd Recyclables 1x per week
64-Gallon Organics 1x per week
2862
2863
ITEM 9.3. ATTACHMENT 2

Page 108 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 89 of 98 2864 Exhibit 4
2865 City of Rancho Cordova, CA
2866 Cart Specifications
2867 Specifications and Performance Criteria for 32-, 64-, and 96-gal Gray, Blue and Green Carts Volumetric
Capacity
• 32-gal, 64-gal, and 96-gal, excluding volume resulting from a crowned lid in the closed position
Minimum
Load Rating
• 32-gal: 100 lbs.
• 64-gal: 175 lbs.
• 96-gal: 250 lbs.

Compatibility
• Compatible with commercially available fully automated lifting mechanisms that are or will be used in Rancho Cordova
Standards of
Design
• Designed such that wastes flow freely out of the cart when dumped by a fully automated lifting mechanism
Dimensions
& Design
• Body of cart -- nestable for economic bulk transportation and to facilitate distribution to users
• Maximum width of 31” including lid and wheels
• Leak proof
Finish
Surfaces
• Interior surface must be smooth with a semi- or high-gloss finish • Exterior surface must be suitable for hot stamping on lid and body • Exterior must be free of sharp edges and corners, protrusions, or other structures that could pose a nuisance or hazard to humans Identification
& Markings
• The lid must have a suitable area to affix an appropriate label for recycling education or other information
• The following must be hot-stamped on the lid:

1. facing street arrow
• The following must be hot-stamped on the cart body:

1. City’s logo

2. serial number (sequentially numbered)

3. production batch number and date

4. maximum load weight rating

5. cart type, per clause 4.2.1f of ANSI Z245.30-99
Color
• Garbage: Gray
• Recycling: Blue
• Green Waste: Green
Warranty
• Minimum 10 years for all parts of cart; not prorated; any failure under warranty shall be replaced with a newly manufactured whole cart, which is defined to be the body of the cart, wheel, lid, handles, other ancillary features and fasteners
* CONTRACTOR is not required to replace functional Containers, including Containers purchased prior to January 1, 2022, that do not comply with the color requirements of this Exhibit prior to the end of the useful life of those Containers, or prior to the end of the Contract Term, whichever comes first. 2868
ITEM 9.3. ATTACHMENT 2

Page 109 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 90 of 98 2869 Exhibit 5
2870 PERFORMANCE BOND
2871 COLLECTION SERVICES
2872 FOR THE
2873 CITY OF RANCHO CORDOVA, CALIFORNIA
2874
2875 KNOW ALL MEN BY THESE PRESENTS: that
2876
2877 (here insert full name and address or legal title of contractor) 2878 as Principal, hereinafter called Contractor, and, 2879 (Name of insurer) 2880 as Surety, hereinafter called Surety, are held firmly bound unto the CITY OF Rancho 2881 Cordova, CALIFORNIA as Obligee, hereinafter called the City, in the amount of 2882 ____________________________________________________ for the payment 2883 whereof Contractor and Surety bind themselves, their heirs, executors, administrators, 2884 successors and assigns, jointly and severally, firmly by these presents. 2885 WHEREAS, Contractor has by written agreement dated ,201_, entered into 2886 a contract with the City for providing Collection Services and Street Sweeping Services, 2887 which Contract is by reference made a part hereof, and is hereinafter referred to as the 2888 Contract.
2889 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor 2890 shall promptly and faithfully perform said Contract, then this obligation shall be null and 2891 void; otherwise it shall remain in full force and effect. 2892 And the Surety, for value received, hereby stipulates and agrees that no change, 2893 extension of time, alteration or addition to the terms of the Contract or to the work to be 2894 performed thereunder or the specifications accompanying the same shall, in any way, 2895 affect its obligations on this bond and the Surety does hereby waive notice of any such 2896 change, extension of time, alteration, or addition to the terms of the Contract or to the work 2897 or the specifications. The Surety hereby specifically waives the provisions of Sections 2898 2819 and 2845 of the California Civil Code.
2899 In the event suit is brought upon this bond by the City and judgment is recovered, the 2900 Surety shall pay all costs incurred by the City in such suit, including reasonable attorney's 2901 fees to be fixed by the Court.
2902 Whenever Contractor shall be, and declared by the City to be in default under the Contract, 2903 the City having performed the City's obligations thereunder, the Surety may promptly 2904 remedy the default, or shall promptly perform one of the following:
2905 1. Complete the Contract in accordance with its terms and conditions. 2906 2. Obtain a bid or bids for completing the Contract in accordance with the 2907 terms and conditions, and upon determination by the Surety of the lowest 2908 and most responsible bidder, or if the City elects, upon determination by 2909 the City and the Surety jointly of the lowest and most responsible bidder, 2910 arrange for a contract between such bidder and the City, and make 2911 available as work progresses (even though there should be a default or a ITEM 9.3. ATTACHMENT 2

Page 110 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 91 of 98 2912 succession of default under the contract or contracts of completion 2913 arranged under this paragraph) sufficient funds to pay the cost of 2914 completion less the balance of the contract price; but not exceeding, 2915 including costs and damages for which the Surety may be liable hereunder, 2916 the amount set forth in the first paragraph hereof. The term "balance of the 2917 contract price," as used in this paragraph, shall mean the total amount 2918 payable by the City to Contractor under the Contract and any amendments 2919 thereto, less the amount properly paid by the City to Contractor. 2920 Any suit under this bond must be instituted before the expiration date of the Contract or if 2921 extended for an additional term by the City, the expiration of the extended term. 2922 No right of action shall accrue on this bond to or for the use of any person or corporation 2923 other than the City named herein or the executor, administrator or successors of the City 2924 of Rancho Cordova, California.
2925 Signed and sealed this day of , 201_.
2926 .
2927 (Principal) (Seal)
2928 .
2929 (Witness)
2930
2931 (Title)
2932 .
2933 Surety (Seal)
2934 (Name of Insurer)
2935 .
2936 (Witness)
2937 By:
2938
2939 (Attorney-in-Fact)
2940
ITEM 9.3. ATTACHMENT 2

Page 111 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 92 of 98 2941 Exhibit 6
2942 City of Rancho Cordova, CA
2943 Approved Subcontractors
2944
2945
2946 Street Sweeping Subcontractor:
2947
2948 Contract Sweeping
2949 Jesse Alvarado, Region Operations Manager
2950 [email protected]
2951
2952 Customer Support
2953 Office (408) 498-4631
2954 Cell (209) 229-5999
2955
2956
ITEM 9.3. ATTACHMENT 2

Page 112 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 93 of 98 2957 Exhibit 7
2958 City of Rancho Cordova, CA 2959 Vehicle Specifications Vehicle Specifications
Unit
(Assigned ID #) Truck Type Legal Gross Weight(lbs)
Tare Weight
(lbs)
Legal Payload
(lbs)
2008 Rear end
loader 58,000 38,940 19,060
2009 Rear end
loader 58,000 39,000 19,000
2411 Resi-FEL 57,500 39,200 18,300
2420 Resi-FEL 57,500 39,760 17,740
2441 Resi-FEL 57,500 40,380 17,120
2466 Resi-FEL 57,500 39,900 17,600
2467 Resi-FEL 57,500 39,920 17,580
2468 Resi-FEL 57,500 40,060 17,440
2469 Resi-FEL 57,500 39,980 17,520
2470 Resi-FEL 57,500 39,820 17,680
2471 Resi-FEL 57,500 39,820 17,680
2472 Resi-FEL 57,500 39,340 18,160
2473 Resi-FEL 57,500 39,320 18,180
2474 Resi-FEL 57,500 39,680 17,820
2475 Resi-FEL 57,500 39,120 18,380
2477 Resi-FEL 57,500 39,860 17,640
2479 Resi-FEL 57,500 39,300 18,200
2480 Resi-FEL 57,500 39,540 17,960
2481 RESI 57,500 37,920 19,580
2482 RESI 57,500 38,180 19,320
2483 RESI 57,500 38,000 19,500
2484 RESI 57,500 37,760 19,740
2485 RESI 57,500 37,920 19,580
2486 RESI 57,500 38,040 19,460
9003 Loader n/a n/a n/a
9032 Loader n/a n/a n/a
9033 Loader n/a n/a n/a
69 Toter Truck n/a n/a n/a
2960
ITEM 9.3. ATTACHMENT 2

Page 113 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 94 of 98 2961
Vehicle Specifications (Cont.)
Unit
(Assigned ID #) DMV License Plate Chassis Make Chassis Model Mfg Year
(age of chassis and body)
2008 61754M2/jul Peterbilt 520 2018
2009 60778M2/jul Peterbilt 520 2018
2411 86700G2/jun Peterbilt 520 2017
2420 87598G2/aug Peterbilt 520 2017
2441 35487H2/aug Peterbilt 520 2017
2466 87155G2/jul Peterbilt 520 2018
2467 86957G2/jun Peterbilt 520 2017
2468 34999H2/jul Peterbilt 520 2017
2469 06117S2/jul Peterbilt 520 2017
2470 87696G2/aug Peterbilt 520 2017
2471 35486H2/aug Peterbilt 520 2017
2472 41873H1/aug Autocar WX64 2012
2473 41880H1/aug Autocar WX64 2012
2474 53347P1/aug Autocar WX64 2012
2475 02735M1/may Autocar WX64 2013
2477 09909M1/nov Autocar WX64 2013
2479 41855H1/aug Autocar WX64 2012
2480 02734M1/may Autocar WX64 2013
2481 23714T2/aug Peterbilt 520 2020
2482 23509T2/jul Peterbilt 520 2019
2483 23713T2/aug Peterbilt 520 2020
2484 63852S2/apr Peterbilt 520 2019
2485 64079S2/apr Peterbilt 520 2019
2486 12353S2/mar Peterbilt 520 2019
9003 n/a John Deere 244J 2006
9032 n/a Volvo L30B 2012
9033 n/a Volvo L30B 2012
69 70250W1 International 4300 2015
ITEM 9.3. ATTACHMENT 2

Page 114 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 95 of 98 2962
Vehicle Specifications (Cont.)
Unit
(Assigned ID #) Unit Serial Number Fuel Type
Date of
Acquisition
Decibel
Rating
2008 3BPDX20X4JF161699 CNG 7/3/18 82
2009 3BPDX20X7JF161700 CNG 6/18/18 83
2411 3BPDX20X0HF174735 CNG 6/1/17 84
2420 3BPDX20X6HF174738 CNG 5/12/17 83
2441 3BPDX20X8HF174739 CNG 5/12/17 85
2466 3BPDX20X4HF174740 CNG 2/22/17 83
2467 3BPDX20X6HF174741 CNG 2/22/17 83
2468 3BPDX20XXHF174743 CNG 2/22/17 84
2469 3BPDX20X0JF174742 CNG 5/12/17 84
2470 3BPDX20X2HF174736 CNG 5/12/17 83
2471 3BPDX20X4HF174737 CNG 5/12/17 83
2472 5VCACDLE4CH213732 CNG 7/19/12 85
2473 5VCACDLE8CH213734 CNG 6/27/12 84
2474 5VCACDLE3CH213740 CNG 7/18/12 85
2475 5VCACSLE3DH215915 CNG 5/21/13 83
2477 5VCACSLE1DH216125 CNG 9/25/13 84
2479 5VCACDLE7CH213739 CNG 7/3/12 85
2480 5VCACSLE8DH215909 CNG 5/21/13 84
2481 3BPDX20X2KF105908 CNG 6/25/19 83
2482 3BPDX20X4KF105909 CNG 6/25/19 83
2483 3BPDX20X0KF105910 CNG 6/25/19 85
2484 3BPDX20X2KF105911 CNG 3/15/19 84
2485 3BPDX20X4KF105912 CNG 3/8/19 84
2486 3BPDX20X6KF105913 CNG 3/8/19 83
9003 LV244JX714081 Diesel 12/1/09 85
9032 VCEOL30BJ01836334 Diesel 5/24/12 85
9033 VCEOL30BA01836337 Diesel 5/29/12 86
69 3HAMMMML8GL155941 Diesel 2/10/20 85 2963
ITEM 9.3. ATTACHMENT 2

Page 115 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 96 of 98 Vehicle Specifications (Cont.)
Unit
(Assigned ID #) Service Performed Type of Service Notes 2008 Bulky Spare Resi Spare Rear Loader
2009 Bulky Resi Rancho Rear Load
2411 Recycle/Green Waste Resi Spare
2420 Recycle/Green Waste Resi Spare
2441 Recycle/Green Waste Resi Rte 874
2466 Recycle/Green Waste Resi Rte 752
2467 Recycle/Green Waste Resi Relief Driver
2468 Recycle/Green Waste Resi Rte 753
2469 Recycle/Green Waste Resi Rte 751
2470 Recycle/Green Waste Resi Rte 754
2471 Recycle/Green Waste Resi Rte 771
2472 Recycle/Green Waste Resi Spare
2473 Recycle/Green Waste Resi Rte 870 / 770
2474 Recycle/Green Waste Resi Spare
2475 Recycle/Green Waste Resi Commercial Spare
2477 Recycle/Green Waste Resi Rte 774
2479 Recycle/Green Waste Resi Rte 773
2480 Recycle/Green Waste Resi Rte 772
2481 Curbside Trash Resi Rte 871
2482 Curbside Trash Resi Rte 851
2483 Curbside Trash Resi Rte 854
2484 Curbside Trash Resi Rte 873
2485 Curbside Trash Resi Rte 853
2486 Curbside Trash Resi Rte 852
9003 Bulky Loader Resi Primary Rancho Loader
9032 Bulky Loader Resi Spare Loader
9033 Bulky Loader Resi Spare Loader
69 Toter Delivery Resi Toter Delivery
2964
ITEM 9.3. ATTACHMENT 2

Page 116 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 97 of 98 2965 Exhibit 8
2966 Monthly Street Sweeping Reports
2967 CONTRACTOR shall compile data on a daily basis and report the following 2968 information in electronic format to CITY on a monthly basis:
2969 Daily Route Data – CONTRACTOR shall provide the following data for each 2970 portion of the route swept. Data shall include at a minimum, the following 2971 information:
2972
2973 1. Date of sweep
2974 2. Route number
2975 3. Street Sweeper identification number performing each route 2976 4. Name of sweeper operator on each route
2977 5. Total number of miles scheduled on entire route 2978 6. Total number of miles swept on entire route
2979 7. Beginning and ending odometer readings for portion of route completed 2980 8. Location of Sweep Waste transfer site or dumpsite 2981 9. Estimate of tons of debris collected and delivered to transfer site or 2982 dumpsite
2983 10. Estimate of volume (in cubic yards) of debris collected and delivered to 2984 transfer site or dumpsite
2985 11. Listing of streets not swept and reason for not sweeping 2986 12. Approximate number of parked cars using on-street parking on each 2987 sweep route
2988 13 Location of street trees that interfere with sweeping operations 2989 841.1054 2820194.1
2990
ITEM 9.3. ATTACHMENT 2

Page 117 of 1447 ends

Collection Services Contract No. 56-2017-1
Collection Services Contract between March 21, 2022
City of Rancho Cordova and Allied Waste Services of North America Page 98 of 98 2991 Exhibit 9
2992 Contamination Auditor and Reporting Plan for SB 1383 2993 Recyclable Materials and Organic Recyclable Material Contamination 2994 CONTRACTOR must offer the Residential Service Recipients Containers in a size and collection 2995 frequency that matches their unique service needs to reduce Prohibited Container Contaminants. 2996 To support City’s diversion goals, CONTRACTOR is only required to collect Recyclable Materials 2997 if they have been separated by the Service Recipient from Garbage and Organic Recyclable 2998 Materials and is only required to collect Organic Recyclable Materials if it has been separated by 2999 the Service Recipient from Garbage and Recyclable Materials. 3000 As part of CONTRACTOR’s Public Education Services under Section 14.01, CONTRACTOR 3001 agrees to provide outreach and customer service support to Service Recipients. Additionally, 3002 CONTRACTOR’s route collection personnel will report to CONTRACTOR’s supervisors if they 3003 observe potential Prohibited Container Contaminant problems, and/or insufficient collection 3004 capacity. For purposes of determining if Recyclable Materials or Organic Recyclable Materials are 3005 deemed to contain Prohibited Container Contaminants, if, by visual or digital inspection, Recyclable 3006 Materials are commingled with ten percent (10%) by weight or volume of Garbage or Organic 3007 Recyclable Materials, or if, by visual inspection, Organic Recyclable Materials is commingled with 3008 three percent (3%) by volume of Garbage or Recyclable Materials, then Recyclable Materials 3009 and/or Organic Recyclable Materials will be deemed to be contaminated and CONTRACTOR may 3010 take the steps outlined in Article 7.
3011
ITEM 9.3. ATTACHMENT 2

Page 118 of 1447 ends

MEMORANDUM
City Council Staff Report - Page 1 of 2

ITEM 9.4.

DATE: March 21, 2022
TO: Honorable Mayor and Council Members
FROM: Stefan Heisler, Housing Manager
SUBJECT: APPROVAL OF A GRANT APPLICATION AND LOCAL MATCH

REQUIREMENT FOR THE POTENTIAL HEALTH AND WELLNESS

CENTER AT THE MILLS CROSSING CIVIC CENTER

RECOMMENDATION
Provide direction and approve the Resolution authorizing an application for, local match commitment to, and receipt of, Behavior Health Continuum Infrastructure Program (BHCIP) grant funds.

RESULT OF RECOMMENDED ACTION
Action on this item will allow staff to submit an application to the competitive statewide BHCIP $518.5 million Round 3 Launch Ready grant program (with $23,553,889 set aside for the Sacramento region), and approve a local funding match of 10% of the awarded grant amount for grant funding to construct a potential health and wellness center at the Mills Crossing Civic Center.

BACKGROUND
The approved concept plan (on December 6, 2021) for the Mills Crossing Civic Center (MCCC) includes approximately 80,000 to 120,000 square feet of community-commercial facilities including:
 a 30,000 square feet community arts center (including a 300-seat black box theater),  a 30,000 square feet flexible community-commercial building,  a potential +/- 30,000 square feet of sports/recreation space,  a potential +/- 30,000 square feet health and wellness center,  approximately 2.5 acres of public open space/plazas/neighborhood greens,  and an estimated 120 to 125 units of mixed-income housing (where at least 25% of the units will be affordable).

As the Mills Crossing Civic Center project continues to progress, staff are looking for multiple funding opportunities to augment and maximize the leverage of the City’s future investments in each component of this project. The subject of this report is a grant opportunity for the health

Page 119 of 1447 ends

City Council Staff Report - Page 2 of 2
and wellness center. Future grant opportunities will likely be available for the theater, arts, community commercial, public open spaces, and housing components.

One such opportunity to augment and leverage the City’s investment has arisen for the health and wellness component of the MCCC. The Department of Health Care Services (DHCS) was authorized through legislation in 2021 to establish BHCIP and award approximately $2.1 billion to construct, acquire, and expand properties and invest in outpatient healthcare infrastructure that addresses behavioral health needs.

DHCS issued a Request for Applications (RFA) on January 31, 2022 for BHCIP Round 3 Launch Ready grants in the amount of $518,500,000 with $23,553,889 set-aside for the Sacramento Area. The City may only apply for the amount set-aside for the Sacramento region.

BHCIP Launch Ready grants provide funding to construct, acquire, and rehabilitate real estate assets to expand the behavioral health continuum of treatment and service resources .

Proposed projects must demonstrate they have been through a planning process and are ready for implementation. Projects submitted by City applicants are required to make a local match of ten percent (10%) of grant amount.

Eligible projects include community wellness centers very similar to what has been envisioned for the future health and wellness component of the Mills Crossing Civic Center. While this grant would support the construction of the entire health and wellness center, behavioral health is envisioned as being only a portion of the services offered in addition to primary medical, dental, and vision care, specialty health (acupuncture, physical therapy, etc.), community health, and others.

Securing a BHCIP grant will significantly increase the long-term financial feasibility of the wellness center component of the Mills Crossing Civic Center and improve the City’s long-term operational sustainability of the project.

Pending Council direction, staff will finalize the application funding request, and the local match requirement, for the application due date of March 31, 2022.

FISCAL IMPACT AND FUNDING SOURCE
The BHCIP grant award is capped at $23,553,889 within the Sacramento Region at large and requires a local match of 10% of the potential project grant amount eventually awarded by DHCS.

ATTACHMENT(S)

1. Resolution

Page 120 of 1447 ends

ITEM 9.4. ATTACHMENT 1
Resolution No. XX-2022 Page 1 of 2

CITY OF RANCHO CORDOVA
RESOLUTION NO. XX-2022

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CORDOVA, STATE

OF CALIFORNIA, AUTHORIZING APPLICATION AND LOCAL MATCH FOR BEHAVIORAL

HEALTH CONTINUUM INFRASTRUCTURE PROGRAM GRANT FUNDS
WHEREAS, the Department of Health Care Services (Department) has issued a Request for Applications (RFA) as part of the Behavioral Health Continuum Infrastructure Program Round 3 Launch Ready grant (BHCIP); and
WHEREAS, BHCIP provides grant funding for projects that construct, acquire, and rehabilitate real estate assets to expand the behavioral health continuum of treatment and service; and
WHEREAS, the Department issued an RFA and Application on January 31, 2022 in the amount of $518,500,000 for assistance to all California jurisdictions; and WHEREAS, the City Council of the City of Rancho Cordova desires to submit a BHCIP grant application package (“Application”), on the forms provided by the Department, for approval of grant funding to develop a health and wellness center at the Mills Crossing Civic Center site located at 10154-10179 Folsom Blvd as part of the community commercial portion of the Mills Crossing Civic Center Project; and
WHEREAS, the City of Rancho Cordova is eligible to apply for up to $23,553,889 in BHCIP funding; and
WHEREAS, City applicants for BHCIP funding are required to provide matching funds in the amount of ten percent (10%) of the grant amount.

NOW, THEREFORE, BE IT HEREBY RESOLVED THE CITY COUNCIL OF THE CITY OF RANCHO CORDOVA AS FOLLOWS:

SECTION 1. The City Manager, or his designee, is hereby authorized and directed to apply for and submit to the Department the Application in an amount not to exceed $23,553,889.

SECTION 2. The City Council hereby agrees to commit matching funds in the amount of 10% of the grant amount, anticipated not to exceed Two Million Three Hundred Fifty Thousand Dollars ($2,350,000).

SECTION 3. In connection with the BHCIP grant, if the Application is approved by the Department, the City Manager, or his designee, of the City of Rancho Cordova is authorized to enter into, execute, and deliver any and all documents required or deemed necessary or appropriate to evidence and secure the BHCIP grant, including the required local funding match, the City’s obligations related thereto, and all amendments thereto.

SECTION 4. The City Council hereby agrees to use the funds for eligible uses and allowable expenditures in the manner presented and specifically identified in the approved Application.

Page 121 of 1447 ends

ITEM 9.4. ATTACHMENT 1
Resolution No. XX-2022 Page 2 of 2
PASSED AND ADOPTED by the City Council of the City of Rancho Cordova on the 21st day of March 2022 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

ATTEST:

Donald Terry, Mayor
Stacy Leitner, CMC
City Clerk

Page 122 of 1447 ends

MEMORANDUM
City Council Staff Report - Page 1 of 2

ITEM 9.5.

DATE: March 21, 2022
TO: Honorable Mayor and Council Members
FROM: Albert Stricker, Public Works Director
Ben Chan, Assistant Civil Engineer
SUBJECT: A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT NO. 174-2019-1 WITH R.E.Y. ENGINEERS, INC. EXTENDING THE TERM TO DECEMBER 31, 2023, INCREASING THE CONTRACT AMOUNT FROM $739,649 TO AN AMOUNT NOT TO
EXCEED $764,649 AND ADDING SERVICES FOR THE CORDOVA

VINEYARDS/LANE NEIGHBORHOOD STREET REHABILITATION

PROJECT

RECOMMENDATION
Adopt the Resolution.

RESULT OF RECOMMENDED ACTION
Adoption of the Resolution would authorize the City Manager to execute Contract Amendment No. 174-2019-1 with R.E.Y. Engineers, Inc. extending the term to December 31, 2023, increasing the contract amount from $739,649 to an amount not to exceed $764,649 and adding services for the Cordova Vineyards/Lane Neighborhood Street Rehabilitation Project.

BACKGROUND
The City previously entered into a contract with R.E.Y. Engineers, Inc. for engineering services on November 19, 2019. The increase in the contract amount of $25,000 will allow R.E.Y.

Engineers, Inc. to perform engineering support to include Zinfandel Dr generally from Folsom Boulevard to Cordova Lane, and Malbec Court.

The Cordova Vineyards/Lane Neighborhood Street Rehabilitation Project includes an overlay of existing pavement to improve the road surfaces, sidewalk repairs and curb ramp upgrades to achieve compliance with the Americans with Disabilities Act, storm drain upgrades to improve flood protection, and other incidental work as required.

The project will improve the aesthetics and safety in the neighborhood, and also improve traffic conditions for motorists, pedestrians and bicyclists.

The rehabilitation of the neighborhood streets is not only necessary, but also aligns with City goals to promote the positive image of Rancho Cordova; ensure a safe, inviting and livable

Page 123 of 1447 ends

City Council Staff Report - Page 2 of 2
community; and ensure the availability of the best public services in the region while practicing sound financial management.

FISCAL IMPACT AND FUNDING SOURCE
Funding for this project will consist of Community Enhancement Funds, Gas Tax, Road Maintenance and Rehabilitation Fund, Measure A Maintenance Fund, Supplemental Transportation, Stormwater Enterprise Fund and Capital Infrastructure Fund.

This project is included in the City’s current approved Capital Improvement Plan and in the 2021/22 budget.

ATTACHMENT(S)

1. Resolution

2. Contract Amendment No. 174-2019-1

Page 124 of 1447 ends

ITEM 9.5. ATTACHMENT 1
Resolution No. XX-2022 Page 1 of 2

CITY OF RANCHO CORDOVA
RESOLUTION NO. XX-2022

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CORDOVA, STATE

OF CALIFORNIA, AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT NO. 174-2019-1 WITH R.E.Y. ENGINEERS, INC. EXTENDING THE TERM TO DECEMBER 31, 2023, INCREASING THE CONTRACT AMOUNT FROM $739,649 TO AN AMOUNT NOT TO EXCEED $764,649, AND ADDING SERVICES FOR THE CORDOVA

VINEYARDS/LANE NEIGHBORHOOD STREET REHABILITATION PROJECT WHEREAS, the Parties entered into a Professional Services Agreement (“PSA”) dated November 19, 2019 for the purpose of providing on-call civil engineering and surveying services; and
WHEREAS, Contract Amendment No. 174-2019-1 increases the contract amount from $739,649 to $764,649; and
WHEREAS, Contract Amendment No. 174-2019-1 extends the contract expiration date from December 31, 2022 to December 31, 2023; and
WHEREAS, this agreement will provide compensation to allow R.E.Y. Engineers, Inc. to assist the City to perform engineering support for additional scope of work to design Zinfandel Dr generally between Folsom Boulevard and Cordova Lane, and Malbec Court; and WHEREAS, the contract will be paid through the Measure A, Capital Infrastructure, and Community Enhancement funds. The contract does not impact the general fund.

NOW, THEREFORE, BE IT HEREBY RESOLVED THE CITY COUNCIL OF THE CITY OF RANCHO CORDOVA does authorize the City Manager to execute Contract Amendment No. 174-2019-1 with R.E.Y. Engineers, Inc., to increase the contract amount from $739,649 to an amount not to exceed $764,649, extend the contract expiration date from December 31, 2022 to December 31, 2023 and to add services for the Cordova Vineyards/Lane Neighborhood Street Rehabilitation Project, in a form approved by the City Attorney.

PASSED AND ADOPTED by the City Council of the City of Rancho Cordova on the 21st day of March 2022 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Page 125 of 1447 ends

ITEM 9.5. ATTACHMENT 1
Resolution No. XX-2022 Page 2 of 2
ATTEST:

Donald Terry, Mayor
Stacy Leitner, CMC
City Clerk

Page 126 of 1447 ends

CONTRACT NO. 174-2019-1
First Amendment to Professional Services Agreement between Page 1 of 2 City of Rancho Cordova and R.E.Y. Engineers, Inc.

FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF RANCHO CORDOVA AND R.E.Y. ENGINEERS, INC. FOR
THE 2020 RC02 STREET REHABILITATION PROJECT
This First Amendment to the Agreement for Professional Services ("Amendment") is made by and between the City of Rancho Cordova (“City”) and R.E.Y. Engineers, Inc. (“Professional”) as of February 04, 2022. City and Professional are hereinafter collectively referred to as the “Parties.”

RECITALS
WHEREAS, the Parties entered into a Professional Services Agreement (“PSA”) dated November 19, 2019 for the purpose of providing on-call civil engineering and surveying services outlined in PSA Exhibit A; and WHEREAS, this Amendment will add additional tasks for the Professional to provide to the City described in the Augmentation attached as Exhibit “C” and will increase the contract compensation amount from Seven Hundred Thirty-Nine Thousand Six Hundred Forty-Nine Dollars and No Cents ($739,649.00), to Seven Hundred Sixty-Four Thousand Six Hundred Forty-Nine Dollars and No Cents ($764,649.00), a budget increase of Twenty-Five thousand dollars ($25,000); and
WHEREAS, this Amendment will extend the end date from December 31, 2022 to December 31, 2023; and WHEREAS, the Parties agree that changes to the term and services provided for in the PSA are necessary in order for the City to continue receiving services by Professional.

NOW, THEREFORE, the Parties hereto agree as follows:

AGREEMENT

1. The Parties agree to modify the end date of the PSA from December 31, 2031, to December 31, 2023. The first sentence of Section 1.1 of the PSA, “Performance Period,” is amended to read as follows:
“The term of this Agreement shall begin on the date first noted above and shall end on December 31, 2023, the date of completion specified in Exhibit A. Professional shall complete the work described in Exhibit A prior to that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Professional to complete the services required by this Agreement shall not affect the City’s right to terminate the Agreement, as provided for in Section 8.”

2. Section 2 of the PSA, "Compensation," provides for the City to pay Professional a sum not to exceed Seven Hundred Thirty-Nine Thousand Six Hundred Forty-Nine Dollars and No Cents ($739,649.00). The Parties agree to amend Section 2 of the PSA in order to increase the compensation amount to pay Professional for additional services. The first sentence of Section 2 of the PSA is amended to read as follows:
"City hereby agrees to pay Professional a sum not to exceed Seven Hundred Sixty-Four Thousand Six Hundred Forty-Nine Dollars and No Cents ($764,649.00), notwithstanding any contrary indication that may be contained in Professional's proposal, for services to be performed and reimbursable costs incurred under this Agreement."

3. The attached Exhibit “C” is hereby added to the PSA which provides for additional services and compensation as specified therein.

ITEM 9.5. ATTACHMENT 2

Page 127 of 1447 ends

CONTRACT NO. 174-2019-1
First Amendment to Professional Services Agreement between Page 2 of 2 City of Rancho Cordova and R.E.Y. Engineers, Inc.

4. All other terms and conditions in the PSA shall remain in full force and effect to the extent they are not in conflict with this Amendment.

5. The signatures of the Parties to this Amendment may be executed and acknowledged on separate pages or in counterparts which, when attached to this Amendment, shall constitute one complete Amendment.

IN WITNESS WHEREOF, the Parties have executed this Amendment on the day and year first above written.

CITY OF RANCHO CORDOVA PROFESSIONAL
_______________________________
Cyrus Abhar, City Manager
Date: _______________
Attest:
_______________________________
Stacy Leitner, CMC
City Clerk
Date: _______________
Approved as to Form:
_______________________________
Adam Lindgren, City Attorney
Date: _______________
_______________________________
James Fisher, Principal
Date: ________________
Attachments:

Exhibit C
ITEM 9.5. ATTACHMENT 2

Page 128 of 1447 ends

September 1st, 2021
Ben Chan
City of Rancho Cordova
Public Works Department
2729 Prospect Park Drive
Rancho Cordova, CA 95670 sent via email: [email protected] Subject: 2020 Neighborhood Street Rehabilitation Project – RC02: Contract Amendment Request #1
Dear Mr. Chan,
Thank you for the opportunity to work with the City of Rancho Cordova (City) on the 2020 Neighborhood Street Rehabilitation Project – RC02 (Project). As the Project has progressed, we have incurred costs for unanticipated items of work outside of our initial scope of services for which we are now requesting a contract amendment to augment our budgeted amount to account for these additional services. We held off on this amendment request in an effort to minimize the additional costs and attempt to absorb as much of the extra work into our original budget as possible. The additional items of work are described below.

Our initial scope and fee included a utility coordination task that was limited to only the distribution of project A-Letters. In addition to the distribution of A-Letters, we created and sent B-Letter packages to the utility owners with facilities in conflict with this project and performed considerable amounts of coordination with those utility owners. Our original scope and fee included an assumption that stated “no utility relocations will be required other than adjustments to grade of City owned utilities.” We successfully coordinated with PG&E to have four shallow gas services lowered out of conflict with the Full Depth Reclamation with Cement (FDR-C) roadway section ahead of the start of construction for Phase 2.

As a part of the City’s Phase 1 65% PS&E comments, the City performed a detailed site walk and we were provided the locations of damaged curb, gutter and sidewalk that the City wished to have replaced with this project. With the City’s 90% PS&E comments, a portion of Dolecetto Dr., Barbera Way, Lambrusca Dr., Ribier Way, Charbono Way, Chianti Ct., Zaggos Ct., Coloma Frontage (SW), Milazzo Way, and Pedro Way were added to the scope of Phase 1. R.E.Y.

Engineers performed a detailed site walk of the added streets to identify areas of damage and to review the locations of resident comments collected from the MetroQuest survey. After the site walk, we compiled our notes and photos into a report for the City’s review and ultimate acceptance.

As a result of reorganizing the streets between phases, the already completed phase 1 and phase 2 geotechnical Pavement Engineering Reports we consolidated and combined into the RC02 Neighborhood Street Pavement Engineering Report. This report superseded the individual phase 1 and phase 2 reports and included the geotechnical findings for all streets within the project limits.

ITEM 9.5. ATTACHMENT 2

Page 129 of 1447 ends

In developing our initial scope and fee, we made assumptions based on the street PCI data regarding which streets would receive pavement rehabilitation treatments and which streets would receive roadway reconstruction treatments by means of FDR-C. It was planned that streets identified as having a PCI of 26 or less would receive full roadway reconstruction and on these streets our subconsultant marked the depths of the existing utilities to proactively identify shallow utilities that may be in conflict with the FDR-C operations. For the streets initially planned to receive a pavement rehabilitation treatment, we performed pavement analytics and a site walk to identify digout locations. Once we received the results of the geotechnical investigations, we learned that, in addition to the streets previously identified for roadway reconstruction, Beclan Drive and Momolo Court were also good candidates for FDR-C.

Contrarily, we learned that Tannat Way, Saltana Way, Nieretto Court, Malvasia Way, Sarda Way, Vernaccia Circle, Zibibba Way and Negrara Way were all in better shape than initially anticipated and switched from full roadway reconstruction to pavement rehabilitation. To accommodate these changes in scope, a second round of utility investigation and digout identification tasks were performed.

Per the City’s request, improvements to Zinfandel Drive and Malbec Court were added to the Phase 2 plan set as a bid alternate. Additional work to incorporate these improvements included the development of plan sheets, details, quantity take offs, and striping configuration as well as a minimal amount of geotechnical investigation.

The costs accumulated for the additional services rendered, as described above, was $31,834.00.

In an effort to partner with the City, we are only requesting that $25,000 be added to our current total contract amount of $739,649.00, amending it to a new total of $764,649.00.

If you have any questions or comments, please don’t hesitate to contact me.

Sincerely,
Jim Fisher, PE, QSD/P
ITEM 9.5. ATTACHMENT 2

Page 130 of 1447 ends

MEMORANDUM
City Council Staff Report - Page 1 of 2

ITEM 9.6.

DATE: March 21, 2022
TO: Honorable Mayor and Council Members
FROM:

Stacy Delaney, Community Enhancement and Investment Senior Management Analyst
Edgar Medina, Principal Engineer
SUBJECT: A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT NO. 2020-183-1 WITH MARK THOMAS &
COMPANY, INC. TO INCREASE THE CONTRACT AMOUNT FROM
$206,800.00 TO AN AMOUNT NOT TO EXCEED $319,235 AND
EXTEND THE CONTRACT TERM TO JUNE 30, 2023 FOR THE SOIL

BORN FARMS PARKING LOT AND DRIVEWAY IMPROVEMENTS

PROJECT AT THE AMERICAN RIVER RANCH TO INCREASE

SAFETY AND PROMOTE LIVABILITY

RECOMMENDATION
Adopt the Resolution.

RESULT OF RECOMMENDED ACTION
Adoption of the Resolution would authorize the City Manager to execute Contract Amendment No. 2020-183-1 to increase the contract amount from $206,800 to $319,235 and extend the contract term to June 30, 2023 for continued engineering design and construction management services with Mark Thomas & Company, Inc. for Soil Born Farms Parking Lot and Driveway Improvements at the American River Ranch to increase safety and promote livability.

BACKGROUND
The Soil Born Farms Urban Agriculture & Education Project's mission is to create an urban agriculture and education project that empowers youth and adults to discover and participate in a local food system that encourages healthy living, nurtures the environment and grows a sustainable community. The goals that support that mission are: 1) Local Organic Food Production, 2) Community Education, 3) Food Access for All and 4) Reconnect with the Land.

In an effort to support the needs of Soil Born Farms, the Parking Lot Improvement Project begins at the facility's entrance off of Chase Drive and extends to existing unpaved parking lot.

The Soil Born Farms parking lot, which is currently unpaved, will be paved and improved with lighting to provide approximately 60 new paved parking stalls. Site amenities will include a widened driveway, deer fence, an entry gate, post and cable railing, entry signs, drainage facilities and lighting.

Page 131 of 1447 ends

City Council Staff Report - Page 2 of 2
In October 2021, the City Council approved a design and construction contract with Mark Thomas & Company, Inc. for the current phase of improvements and in August, 2021, the City Council approved a construction contract with Western Engineering Contractors, Inc.

The project is nearing construction, but has experienced additional design and construction management scope of work effort to keep the project on track to meet the operational needs of Soil Born Farms. Therefore, this contract amendment is for additional scope of work related to design support, construction management and materials testing.

FISCAL IMPACT AND FUNDING SOURCE
The Community Enhancement & Investment Fund will provide an additional $112,435 for the contract amendment.

ATTACHMENT(S)

1. Resolution

2. Contract No. 2020-183-1

Page 132 of 1447 ends

ITEM 9.6. ATTACHMENT 1
Resolution No. XX-2022 Page 1 of 2

CITY OF RANCHO CORDOVA
RESOLUTION NO. XX-2022

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CORDOVA, STATE

OF CALIFORNIA, AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT 2020-183-1 WITH MARK THOMAS & COMPANY, INC., TO INCREASE THE CONTRACT AMOUNT FROM $206,800 TO AN AMOUNT NOT TO EXCEED $319,325 AND EXTEND THE CONTRACT TERM TO JUNE 30, 2023 FOR CONTINUED ENGINEERING

DESIGN AND CONSTRUCTION MANAGEMENT SERVICES ON THE SOIL BORN FARMS

PARKING LOT AND DRIVEWAY IMPROVEMENTS PROJECT AT THE AMERICAN RIVER

RANCH TO INCREASE SAFETY AND PROMOTE LIVABILITY
WHEREAS, in June of 2019, Mark Thomas & Company, Inc. was selected and placed on the pre-qualified list of consultants in response to the 2019 Request for Qualifications to Establish a Pre-Qualified List of Consultants for Civil Design Services, Professional Land Surveying, Environmental Services and Stormwater Services; and WHEREAS, based upon Mark Thomas & Company, Inc.'s demonstrated competence and professional expertise, the City desired to enter into an agreement for professional services for the Soil Born Farms Parking Lot and Driveway Improvements Project at the American River Ranch; and
WHEREAS, on October 19th, 2020, City Council approved Professional Services Agreement (PSA) No. 2020-183 for an amount not to exceed $206,800 for the purposes of providing engineering services for the Soil Born Farms Parking Lot and Driveway Improvements Project at the American River Ranch; and
WHEREAS, funding for the PSA includes Community Enhancement and Investment infrastructure funds and the State Wildlife Conservation Board grants awarded to the County of Sacramento, and reimbursable to the City of Rancho Cordova, for the American River Ranch parking lot Phase I and II grants; and
WHEREAS, this contract amendment will increase the contract amount from $206,800 to an amount not to exceed $319,235, for additional scope of work related to design support, construction management and materials testing to complete the project; and WHEREAS, this contract amendment will extend the contract term to end on June 30, 2023.

NOW, THEREFORE, BE IT HEREBY RESOLVED THE CITY COUNCIL OF THE CITY OF RANCHO CORDOVA does authorize the City Manager or his designee to execute Contract Amendment No. 2020-183-1 with Mark Thomas & Company, Inc. in a form approved by the City Attorney to increase the contract amount from $206,800 to $319,235 and to extend the contract term to end on June 30, 2023 for continued engineering design and construction management services on the Soil Born Farms Parking Lot and Driveway Improvements Project at the American River Ranch to increase safety and promote livability.

PASSED AND ADOPTED by the City Council of the City of Rancho Cordova on the 21st day of March 2022 by the following vote:

Page 133 of 1447 ends

ITEM 9.6. ATTACHMENT 1
Resolution No. XX-2022 Page 2 of 2
AYES:

NOES:

ABSENT:

ABSTAIN:

ATTEST:

Donald Terry, Mayor
Stacy Leitner, CMC
City Clerk

Page 134 of 1447 ends

CONTRACT NO. 2020-183-1
First Amendment to Professional Services Agreement between Page 1 of 3 City of Rancho Cordova and Mark Thomas & Company

FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF RANCHO CORDOVA AND
MARK THOMAS & COMPANY, INC.

FOR THE

SOIL BORN FARMS PARKING LOT AND DRIVEWAY IMPROVEMENTS PROJECT This First Amendment to the Agreement for Professional Services (“Amendment”) is made by and between the City of Rancho Cordova (“City”) and Mark Thomas & Company, Inc. (“Professional”) as of December 31, 2021. City and Professional are hereinafter collectively referred to as the "Parties."

RECITALS
WHEREAS, in June of 2019, Mark Thomas & Company, Inc. was selected and placed on the prequalifed list of consultants in response to the 2019 Request for Qualifications to Establish a PreQualified List of Consultants for Civil Design Services, Professional Land Surveying, Environmental Services and Stormwater Services; and
WHEREAS, based upon Mark Thomas & Company, Inc's demonstrated competence and professional expertise, the City desired to enter into an agreement for professional services for the Soil Born Farms Parking Lot and Driveway Improvements Project at the American River Ranch; and WHEREAS, on October 19th, 2020, City Council approved Professional Services Agreement (PSA) No. 2020-183 in an amount not to exceed $206,800 for the purposes of providing engineering services for the Soil Born Farms Parking Lot and Driveway Improvements Project at the American River Ranch; and
WHEREAS, funding for the PSA includes Community Enhancement Infrastructure Funds and the State Wildlife Conservation Board grants awarded to the County of Sacramento, and reimbursable to the City of Rancho Cordova, for the American River Ranch parking lot Phase I and II grants; and WHEREAS, this contract amendment will increase the contract amount from $206,800 to an amount not to exceed $319,235, for additional scope of work related to design support, construction management and materials testing to complete the project; and WHEREAS, this contract amendment will extend the contract term to end on June 30, 2023.

WHEREAS, the Parties agree that changes to the term and services provided for in the PSA are necessary in order for the City to continue receiving services by Professional.

NOW, THEREFORE, the Parties hereto agree as follows:

AGREEMENT

1. The Parties agree to modify the end date of the PSA from December 31, 2021, to June 30, 2023.

The first sentence of Section 1.1 of the PSA, “Term of Service,” is amended to read as follows:
"The term of this Agreement shall begin on the date first noted above and shall end on June 30, 2023, and Professional shall complete the work described in Exhibit A ITEM 9.6. ATTACHMENT 2

Page 135 of 1447 ends

CONTRACT NO. 2020-183-1
First Amendment to Professional Services Agreement between Page 2 of 3 City of Rancho Cordova and Mark Thomas & Company
prior to that date; unless the term of the Agreement is otherwise terminated or extended, as provided in Section 8."

2. Section 2 of the PSA, “Compensation,” provides for the City to pay Professional a sum not to exceed $206,800.00. The Parties agree to amend Section 2 of the PSA in order to increase the compensation amount to pay Professional for additional services. The first sentence of Section 2 of the PSA is amended to read as follows:

"City hereby agrees to pay Professional a sum not to exceed Three Hundred Nineteen Thousand Two Hundred Thirty-Five Dollars ($319,235), notwithstanding any contrary indication that may be contained in Professional’s proposal, for services to be performed and reimbursable costs incurred under this Agreement.”

3. The document entitled “Scope of Work,” attached hereto as Exhibit A, shall replace and supersede the PSA's Exhibit A.

4. All other terms and conditions in the PSA shall remain in full force and effect to the extent they are not in conflict with this Amendment.

5. The signatures of the Parties to this Amendment may be executed and acknowledged on separate pages or in counterparts which, when attached to this Amendment, shall constitute one complete Amendment.

6. Contract Administration. This Agreement shall be administered by Stacey Delaney ("Contract Administrator"). All correspondence shall be directed to or through the Contract Administrator or his or her designee.

Notices. Any written notice to Professional shall be sent to:

James Pangburn
Project Manager
Mark Thomas & Company Inc
701 University Avenue
Sacramento, Ca. 95825
Email Address (for Insurance Update Requests):
[email protected]
Any written notice to City shall be sent to:

Stacey Delaney
City of Rancho Cordova
2729 Prospect Park Drive
Rancho Cordova, Ca. 95670
Email: [email protected]
ITEM 9.6. ATTACHMENT 2

Page 136 of 1447 ends

CONTRACT NO. 2020-183-1
First Amendment to Professional Services Agreement between Page 3 of 3 City of Rancho Cordova and Mark Thomas & Company
IN WITNESS WHEREOF, the Parties have executed this Amendment on the day and year first above written.

CITY OF RANCHO CORDOVA PROFESSIONAL
____________________________ ______________________________ Cyrus Abhar, City Manager Matt Brogan, Vice President
Date:__________________ Date:__________________
Attest:
____________________________
Stacy Leitner, CMC, City Clerk
Date:__________________
Approved as to Form:
____________________________
Adam U. Lindgren, City Attorney
Date:__________________
ITEM 9.6. ATTACHMENT 2

Page 137 of 1447 ends

SOIL BORN FARMS PARKING LOT AND DRIVEWAY IMPROVEMENTS
City of Rancho Cordova / Soil Born Farms

1 OF 1

SCOPE OF WORK
TASK 1. ADDITIONAL CONSTRUCTION SUPPORT
Mark Thomas will continue to provide design support services during construction on a time and materials basis.

This scope assumes construction in Spring 2022.

TASK 2. ADDITIONAL FINAL DESIGN
This scope includes additional effort to complete the final design. The original scope of work included two (2) rounds of review and comment. The final effort included six (6) rounds of review and comment. It is noted this effort only applies to the civil plans only. No additional budget for the landscape architects is included with this request.

TASK 3. CONSTRUCTION MANGEMENT AND INSPECTION SERVICES
Task 3.1. ADDITIONAL CONSTRUCTION MANAGEMENT AND INSPECTION Mark Thomas will continue to provide design support services during construction on a time and materials basis.

This scope assumes construction in Spring 2022.

Task 3.2. ADDITIONAL MATERIALS TESTING SERVICES
Geocon will continue to provide design support services during construction on a time and materials basis. This scope assumes construction in Spring 2022.

Deliverables
 Final PS&E
 Additional Design Support During Construction
 Additional Construction Management and Inspection Services ITEM 9.6. ATTACHMENT 2

Page 138 of 1447 ends

Sr. Project Manager
Project Engineer
Design Engineer II
Design EngineerI
RE/Structural
Representative
Sr. Project
Accountant
Sr. Project
Coordinator
Geocon
$270 $173 $147 $121 $263 $165 $154

1.0 CONSTRUCTION SUPPORT

1.1 Design Support During Construction & Bid Suppo 8 66 40 2 4 120 $19,364 ‐ $19,364 Subtotal Phase 1 8 66 0 40 0 2 4 120 $19,364 $0 $19,364

2.0 FINAL PS&E2.1 Additional Final Design 67 27 94 $13,116 ‐ $13,116 Subtotal Phase 2 0 0 67 27 0 0 0 94 $13,116 $0 $13,116

3.0 CONSTRUCTION MANAGEMENT & INSPECTIONSERVICES

3.1 Additional CM & Inspection 285 285 $74,955 ‐ $74,955

3.2 Additional Materials Testing Services 0 $0 5,000 $5,000 Subtotal Phase 3 0 0 0 0 285 0 0 285 $74,955 $5,000 $79,955 TOTAL HOURS 8 66 67 67 285 2 4 499OTHER DIRECT COSTS $0 $0 $0 TOTAL COST $2,160 $11,418 $9,849 $8,107 $74,955 $330 $616 $107,435 $5,000 $112,435 COST PROPOSAL FOR PROJECT SCOPE: Rancho Cordova‐Soil Born Farms Parking (AM #1)

TOTAL COST
Subs
Total
Hours
Total MT
Cost
1/10/2022
ITEM 9.6. ATTACHMENT
2

Page 139 of 1447 ends

City Council Staff Report – Page 1 of 6

MEMORANDUM
ITEM 9.7.

DATE: March 21, 2022
TO: Honorable Mayor and Council Members
FROM: Darcy Goulart, Planning Manager
SUBJECT: 2021 GENERAL PLAN ANNUAL REPORT TO INCLUDE THE HOUSING

ELEMENT AND MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN

ANNUAL REPORT

RECOMMENDATION
Receive the 2021 General Plan and Housing Element Annual Report to include the MultiJurisdictional Hazard Mitigation Plan as required by State law.

RESULT OF RECOMMENDED ACTION
By receiving this report, the City Council is satisfying its obligation under State law. No further action is required on the part of the City Council. The purpose of the report is to provide an annual accounting of implementation of the City’s General Plan.

BACKGROUND
General Plan:

State law requires that the City complete an annual review of the General Plan by April 1st of each year, covering the previous calendar year. The purpose of the review is to:
 Identify compliance with the State General Plan Guidelines;  Identify status of the General Plan and the process towards its implementation; Housing Element:
 Describe the City’s progress in meeting its Regional Housings Needs Allocation (related to areas zoned to allow for affordable housing); and
 Describe progress in addressing/removing governmental constraints to the maintenance, improvement, and development of housing.

Further, State law requires that the City submit the report to the Office of Planning and Research (OPR) and the department of Housing and Community Development (HCD).

Completion of the report may make the City eligible for various State grants and other programs.

Page 140 of 1447 ends

City Council Staff Report – Page 2 of 6
The 2021 annual report covers the calendar year (Planning Year) 2021 (January 1 to December 31).

As in previous reports, staff has included a summary outlining the major accomplishments of the City in 2021 related to General Plan implementation. The Report also includes information on the status of residential construction compared to the City’s obligation under the current Regional Housing Needs Plan/Regional Housing Needs Assessment. The tables are used to collect and report this data are required by HCD.

The annual report can be used as a guide for development of the 2022-2023 fiscal budget for the City, helping departments plan their budgets with General Plan implementation in mind.

Multi-Jurisdictional Hazard Mitigation Plan:

The Multi-Jurisdictional Hazard Mitigation Plan (LHMP) assesses natural hazards of concern to Sacramento County and Cities within; evaluates risk to life safety, public health, property, and the environment; and evaluates mitigation measures to reduce these risks and vulnerabilities, minimize losses, and increase community resilience:
 Annual Review describing the City’s progress on the Hazard Mitigation Plan Action Items.

ANALYSIS
General Plan
As indicated in previous reports, staff identified a concern that the actions of the General Plan may not be accurately programmed as they relate to implementation. In an effort to keep the General Plan current and ensure it remains a useful document that sets the policy direction for the City, staff had previously recommended that a more detailed analysis of the General Plan actions be undertaken. This analysis would re-program, as appropriate, some of the General Plan action items as follows:

1. Departments that are more appropriate for leading the work effort;

2. Realign the timing of the actions in keeping with Council-identified priorities, and;

3. Update the General Plan Map.

This effort could also serve as an opportunity to drop actions that are no longer necessary or appropriate for Rancho Cordova and create new ones that are. Completion of this task would result in General Plan amendments to the Implementation Element and General Plan Map. This effort was not programmed into previous year’s work plans for budget reasons. Following completion of the 2021 review, staff is again recommending that this effort be undertaken.

Housing Element
Staff completed the 6th Cycle update to the Housing Element for the period of 2021-2029 and received HCD certification on September 27, 2021.

Staff will continue implementation of preexisting activities and will begin implementation of new activities identified in the Housing Element and monitor the production of units at the income levels required by the regional housing needs allocation (RHNA). The number of units produced during the 2021 calendar year are listed in Table 1: RHNA Allocation and Production for Housing Element Cycle 2021-2029, below. Affordable housing projects continue to face a

Page 141 of 1447 ends

City Council Staff Report – Page 3 of 6
challenging competitive environment for available affordable housing grant funding. However, additional State funding for affordable housing is anticipated to be available over the next several years and staff expect to proceed with planning for one or more new projects in 2022.

New single-family home sales continue to be affordable to households with moderate incomes (sales prices up to $520,250) and above moderate incomes (sales prices above $525,250). No new single-family homes were sold at an affordable price for households with low incomes (sales prices up to $345,000). The most affordable new single-family home sold for $396,000 in the Veranda at Stone Creek neighborhood.

Table 1: RHNA Allocation and Production for Housing Element Cycle 2013-2021 Income Level RHNA
Allocation by
Income Level
2021
Production
Total Units
Produced to
Date 2021-2029
Total Remaining
RHNA by Income
Level 2021-2029
Very Low 2,115 0 100 2,115
Low 1,274 0 0 1,274
Moderate 1,684 235 235 1,449
Above Moderate 3,994 317 317 3,677
Total Units 9,067 552 552 8,515
The current Housing Element cycle extends from 2021 to 2029.

Multi-Jurisdictional Hazard Mitigation Plan
The annual review of the Action Plan has been updated to show the 2021 status. Attachment 5:

City of Rancho Cordova Hazard Mitigation Action Plan. The Multi-Jurisdictional Hazard Mitigation Plan (HMP, 2021-2026) update process finished in October 2021 with the City adopting the updated HMP on March 7, 2022.

FISCAL IMPACTS
The City anticipates that this annual update will result in a minimal fiscal impact as the accomplishments are a balance of quality of living improvements, internal infrastructure improvements, staff training, and revenue generating projects.

Notable 2021 Projects

Page 142 of 1447 ends

City Council Staff Report – Page 4 of 6
2021 Rancho Cordova Youth Center Under Construction
Cordova Community Pool Completed in June 2021, CRPD staff photo White Rock Road Improvements

Page 143 of 1447 ends

City Council Staff Report – Page 5 of 6
Rio Del Oro Infrastructure Construction started in 2021 Zinfandel Drive/Hwy 50 Interchange Improvements: Completed in Oct 2020. Enjoyed in 2021 Community Art SMUD utility Box Wraps

Page 144 of 1447 ends

City Council Staff Report – Page 6 of 6

ATTACHMENTS

1. 2021 General Plan and Housing Element Annual Report

2. General Plan Implementation Action Table 2021

3. Housing Element Status Action Table 2021

4. Housing Element Annual Progress Report 2021

5. City of Rancho Cordova (HMP) Action Plan 2021 Status

Page 145 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
1 CITY OF RANCHO CORDOVA
2021 GENERAL PLAN ANNUAL REPORT

P R E P A R E D B Y T H E P L A N N I N G D E P A R T M E N T C O M P L E T E D M A R C H 2 0 2 2

C I T Y C O U N C I L
Donald Terry, Mayor
Linda Budge, Vice-Mayor
Garrett Gatewood, Council Member
Sirisha Pulipati, Council Member
David Sander, Council Member

Page 146 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
2 TABLE OF CONTENTS
Introduction......................................................................................................................................3 Purpose of the Annual Report.................................................................................................3 Recommendations .....................................................................................................................3 Administration and Status of the General Plan ..........................................................................4 Departmental Responsibilities .................................................................................................4 Amendments to the General Plan...........................................................................................5 General Plan Elements and Implementation Progress..............................................................6 Element Summary......................................................................................................................6 Status of Implementation Actions of the General Plan.......................................................9 Regional Housing Needs and Removal of Governmental Constraints to Housing ......................................................................................................................................10 2013-2021 Regional Housing Needs Plan............................................................................10 Removal of Governmental Constraints to Housing ..........................................................17

Page 147 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
3 INTRODUCTION

P U R P O S E O F T H E AN N U A L RE P O R T
California law requires each city to adopt a comprehensive, long-term General Plan to guide the physical development of the incorporated city and land outside city boundaries that bears a relationship to its planning activities. The General Plan serves as a blueprint for future growth and development; the blueprint to “Build a City.” As such, the plan contains policies and programs designed to provide decision makers with a solid foundation for land use and development decisions.

State law further requires the City to complete an Annual Report by April of each calendar year and submit the report to the Office of Planning and Research and the Department of Housing and Community Development.

This report must:
 Identify compliance with the State General Plan Guidelines;  Identify status of the General Plan and the process towards its implementation;  Describe the City’s progress in meeting its Regional Housings Needs Allocation; and  Describe progress in addressing/removing governmental constraints to the maintenance, improvement, and development of housing.

State law requires that the General Plan Annual Report be complete and submitted to the State by April 1st of each year. The report covers the previous calendar year for which it is being completed. This Annual Report looks at the City’s progress towards implementing its General Plan during the 2021 planning period.

RE C O M M E N D A T I O N S
It is recommended that the City update the Implementation Matrix in the General Plan by adjusting timing, responsible parties, and establishing new action items, as appropriate, during the 2022 Planning Year. This action will require amendment of the General Plan and will help ensure that the goals and policies of the Plan are being achieved by keeping the Plan current. Funding for this task should be included in the 2022-2023 fiscal year budget for all departments.

Tracking the implementation of the General Plan is paramount in achieving the vision of the City that the General Plan establishes and providing this information in a transparent report holds the City accountable to the public for the goals it has set.

This document will provide a status update for major City accomplishments and housing element action items for the 2021 Calendar year. This document will be reviewed for adoption by the City of Rancho Cordova City Council on March 21, 2022 to adhere to the state required due date of April 1, 2022 (Government Code Section 65400(a)(2)).

Page 148 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
4 A copy of the current Implementation Element has been included with this report to indicate the status of all General Plan policies. This included the Implementation plan for the 2021-2029 Housing Element Update.

ADMINISTRATION AND STATUS OF THE

GENERAL PLAN
Upon incorporation in July 2003, the City adopted the Sacramento County General Plan. Soon thereafter, the City embarked on an intensive process of crafting the first General Plan for the City. The resulting plan was adopted on June 26, 2006. More than 50 workshops, stakeholder meetings, study sessions, and public hearings were held to understand the vision and desires for Rancho Cordova and to develop the blueprint to build the future City.

The General Plan for Rancho Cordova includes not only the seven mandated elements of a General Plan as required by State law (land use, circulation, housing, noise, safety, conservation, and open space) but additional topics of special and unique concern to the community, including urban design, economic development, air quality, historic and cultural resources, and infrastructure, services, and finance. As the basis for local government decision-making, the plan includes goals and policies by which projects are analyzed against and actions to be taken by the City necessary to achieving the overall vision for the community.

DE P A R T M E N T A L RE S P O N S I B I L I T I E S
Implementation of the General Plan is the responsibility of the numerous departments and teams in the City.

Each action item identified in the General Plan has been tasked to one or more City departments. The General Plan includes an Implementation Matrix that lists each of the action items in the plan and identifies the responsible agency, timing, and funding source for each action. City departments responsible for implementation of the General Plan include the:
 City Manager’s Office
 Planning Department
 Building Department
 Public Works Department
 Finance Department
 Economic Development Department
 Redevelopment Agency; (no longer valid)
 Housing Division
 Neighborhood Services Division
 Police Department.
 Public Information Office
 Other Agencies/Committees to be established by the Council

Page 149 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
5 There are several other governmental agencies that provide services within the City’s corporate boundary.

While these agencies are not part of the City’s operational structure and not directly responsible for implementation of the General Plan, the City does coordinate its activities with these other agencies and relies upon their assistance for full implementation of the General Plan. These additional agencies include, but are not limited to, the:

Sacramento Metropolitan Fire District;
Cordova Recreation and Parks District;
Folsom-Cordova Unified School District; and
Elk Grove Unified School District.’
Sacramento City Unified
Sacramento County

A M E N D M E N T S T O T H E GE N E R A L PL A N
State law allows the City to amend any of its mandated elements of General Plan up to four times per calendar year. Amendments may be proposed and acted upon at any time during the year and one action may include multiple amendments. Any changes to the General Plan require public hearings by the City Council and evaluation of the environmental impacts as required by the California Environmental Quality Act.

There was one (1) General Plan Amendment that occurred in the year of 2021. The Amendment included the Housing Element that was updated and adopted by the City of Rancho Cordova City Council in June 2021 (Housing Element 2021-2029). This 2021 update satisfies the legally mandated update to reflect the 2021-2029 Regional Housing Needs Allocation. In addition, the Multi-Jurisdictional Hazard Mitigation Plan (2021-2026) was approved and adopted by the City of Rancho Cordova on March 7, 2022.

This annual report includes the General Plan and Housing Element reports as required by State law.

Page 150 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
6 GENERAL PLAN ELEMENTS AND

IMPLEMENTATION PROGRESS

EL E M E N T S U M M A R Y
The General Plan for Rancho Cordova includes twelve elements that cover a variety of topics as provided for in State law. Table 1 lists these elements and shows how they relate to the State requirements (State General Plan Guidelines). The contents of these elements are summarized below. The contents of the General Plan are consistent with the latest edition of the State General Plan Guidelines for content and scope.

T A B L E 1

EL E M E N T S O F T H E GE N E R A L PL A N A N D RE L A T I O N S H I P T O

ST A T E L A W
Section 1-Introduction
This section contains general history and background into the City, but does not contain action programs that require annual monitoring.

Topics Required by State Law
Land
Use Circulation Housing Conservation Open Space Noise Safety Optional
Topic
Land Use X O O
Urban Design O X
Economic Development O O X
Housing X
Circulation X O
Open Space, Parks, and
Trails O O X
Infrastructure, Services, and
Finance O O X
Natural Resources O X
Cultural and Historic
Resources O X
Safety O X
Air Quality O O X
Elements of the Rancho Cordova General Plan
Noise O O X
Notes:

X - Indicates that this element directly addresses the State required topic O - Indicates that information in this element is related to the State required topic

Page 151 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
7 Section 2-Land Use Element
The Land Use Element provides the central framework for the General Plan and serves as a compass to guide planners, the general public, and decision makers on the desired pattern of development in Rancho Cordova.

It describes both existing and future land use activity, the latter of which was designed to achieve the City’s long-range goals for physical development. This Element also identifies the distribution, location, and intensity of all land uses types throughout the City. Text, maps, and diagrams establish the blueprint for future land uses within the City and describe how these uses are integrated with the other General Plan elements and policies.

Section 3-Urban Design Element
The Urban Design Element provides policies and design concepts relating to the form and character of new private development and public improvements, along with focused plans for areas of the City in need of special design attention. The Element also includes policies and implementation programs aimed at creating Rancho Cordova as a unique place with a strong, memorable character.

Section 4-Economic Development Element
The Economic Development Element attempts to identify the City’s strengths and weaknesses as it seeks to provide a full range of employment, housing, retail/service, and entertainment options to residents. The Element establishes goals, policies, and actions to improve the City’s prosperity, maintain regional competitiveness, ensure accessibility to assets, market the City, and, perhaps most importantly, set fair and equitable rules for development. This Element is also intended to create wealth for the citizens of Rancho Cordova by providing opportunities to increase property values, fully utilize their properties, offer continuing education opportunities, and support entrepreneurship.

Section 5-Housing Element
The purpose of the Housing Element is to identify housing solutions that solve local housing problems and to satisfy the Regional Housing Needs Allocation requirements. The City recognizes that housing is a need that is met through many resources and interest groups. This Element establishes the local goals, policies, and actions (programs) the City will implement and/or facilitate to solve the identified housing issues.

Section 6-Circulation Element
The Circulation Element describes existing and future transportation conditions and systems. The Element establishes goals, policies, and actions that will guide the City’s circulation system, including the roadway network, transit facilities and services, and bicycle and pedestrian facilities. The text, maps, and diagrams are a basis for the development of the City’s transportation network.

Page 152 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
8 Section 7-Open Space, Parks, and Trails Element
The Open Space, Parks, and Trails Element identifies the need to maintain existing open space and natural recreational areas, as well as to create additional areas for the enjoyment of residents and the protection of the environment. The goals, policies, and actions provided are intended to achieve the City’s vision of open spaces that are accessible to all members of the community. This Element establishes a policy framework and action program for the improvement, expansion, and maintenance of the City’s open space.

Section 8-Infrastructure, Services, and Finance Element This Element seeks to identify the ideal level and type of infrastructure and service provision necessary to achieving the goal of becoming a first-rate city. It also explores possible mechanisms to finance infrastructure and service improvements. The goals, polices, and actions contained in the Element set forth methods for ensuring that Rancho Cordova provide the highest service levels possible.

Section 9-Natural Resources Element
The Natural Resources Element identifies the ways in which Rancho Cordova will protect, maintain, and enhance its natural resources for the betterment of current residents and future generations. It also attempts to balance the present needs of resource users with the need for resource conservation for the common good.

The goals, policies, and actions in this Element will foster the preservation of Rancho Cordova’s many valuable natural resources, including wildlife, habitat, water resources, soils, and mineral resources.

Section 10-Cultural and Historic Resources Element
The Cultural and Historic Resources Element seeks to identify and protect locally important sites, buildings, and memorabilia that reflect the history of the community. It also seeks to honor the people of Rancho Cordova by promoting the inclusion of cultural arts into the fabric of the community as a component that contributes to the overall quality of life for residents, workers, and visitors. The Element provides goals, policies, and actions designed recognize and preserve the history of the area and celebrate the diversity of the City’s population.

Section 11-Safety Element
The Safety Element seeks to recognize and remedy both present and anticipated concerns about the on-going well being of City residents, employees, and visitors. The goals, policies, and actions identify viable solutions to minimize the potential risk of death, injuries, property damage, and economic hardship and social displacement resulting from fires, floods, earthquakes, landslides, and other hazards. The Multi-Jurisdictional Hazard Mitigation Plan is included in the Safety Element. Additionally, this Element addresses safety and hazards related to airport land use, groundwater contamination, traffic and pedestrian accidents at interfaces with rail lines, the potential release of hazardous materials into the community, and general issues related to police and fire protection services.

Page 153 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
9 Section 12-Air Quality Element
The Air Quality Element establishes a framework for how the City will improve air quality in the Planning Area and work with other communities in the region and the Sacramento Metropolitan Air Quality Management District (SMAQMD) to improve air quality in the Sacramento Valley Air Basin. This Element also underscores the effects that land use patterns and the resulting transportation behavior have on air quality. The goals, policies, and actions outlined in this Element focus on improving air quality through embracing regional coordination, “smart growth” land use concepts, transportation demand management, energy conservation, cleaner industries and vehicles, and public education.

Section 13-Noise Element
The goal of the Noise Element is to identify the major sources of noise within the City and discuss the City’s role in ensuring comfortable and safe noise levels throughout the community. The goals, policies, and actions provided will, when implemented, improve the noise environment in the Planning Area.

Section 14-Implementation Element
This section contains a complete list of the action programs contained within each element. The implementation element was intending to assist staff in the monitoring the progress of those programs.

ST A T U S O F I M P L E M E N T A T I O N AC T I O N S O F T H E GE N E R A L PL A N Attached with this report is the 2021 Implementation Element progress assessment. While some of the programs have been completed or remain incomplete, a majority of the programs within the General Plan remain active and ongoing.

Page 154 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
10 REGIONAL HOUSING NEEDS AND REMOVAL OF

GOVERNMENTAL CONSTRAINTS TO HOUSING
In an effort to address state-wide housing needs, the State of California requires regions to address housing issues and needs based on future growth projections for the area. The Department of Housing and Community Development (HCD) allocates regional housing needs numbers to regional councils of governments throughout the state. The Regional Housing Needs Plan (RHNP) for the Sacramento area is developed by the Sacramento Area Council of Governments (SACOG), and allocates to cities and the unincorporated counties their “fair share” of the region’s projected housing needs, or the Regional Housing Needs Allocation (RHNA).

The needs plan allocation is broken down into four household income groupings over the planning period.

The intent of the RHNP is to ensure that local jurisdictions address not only the needs of their immediate areas but also fill the housing needs for the entire region. Additionally, a major goal of the RHNP is to ensure that every community provides an opportunity for a mix of housing to all economic segments of its population.

State law requires that the City identify its progress in meeting its share of the regional housing needs allocation and identify local efforts to remove governmental constraints to housing. The City’s General Plan Housing Element identifies solutions to meeting these objectives and reflects the 2021-2029 Regional Needs Plan and Regional Housing Needs Allocation for the Sacramento region. 2 0 2 1 - 2 0 2 9 RE G I O N A L H O U S I N G NE E D S PL A N The Sacramento Area Council of Governments (SACOG), along with the City and the other jurisdictions in the region, has prepared the Regional Housing Needs Plan (RHNP) for the 2021-2029 planning period. The 2021-2029 RHNP for the Sacramento region identified a total number of dwelling units as the City’s “fair share” of the regional needs total. Table 2 identifies the breakdown of this number for each of the four income categories covered by the RNHP for the City.

Page 155 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
11 T A B L E 2

CI T Y O F RA N C H O C O R D O V A

S H A R E O F T H E RE G I O N A L NE E D S AL L O C A T I O N F O R 2 0 2 1 - 2 0 2 9
Income
Group
2021-2029
RHNA
Extremely Low 1,057 units
Very Low 1,057 units
Low 1,274 units
Moderate 1,684 units
Above Moderate 3,994 units
Total 9,067 units
Source: SACOG, Regional Housing Needs Plan for Sacramento County; City of Rancho Cordova.

The RHNP and RHNA only require the City to identify a suitable amount of land needed to build the number of units allocated to the City under the RHNA. The Housing Element was updated and certified by HCD in 2021 to reflect the 2021-2029 RHNA.

Table 3 summarizes the number of units permitted in the City in 2021 by income category and dwelling type.

Table 4 summarizes the cumulative total number of units permitted in the City during the current RHNP planning period. All numbers are based on issuance of building permits from January 1 to December 31 of the given year.

Page 156 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
12 T A B L E 3

A N N U A L B U I L D I N G A C T I V I T Y RE P O R T S U M M A R Y

NE W C O N S T R U C T I O N

VE R Y L O W - , L O W - , A N D M I X E D - I N C O M E M U L T I F A M I L Y

P R O J E C T S
Housing Development Information
Housing with Financial
Assistance and/or
Deed Restrictions
Housing
without
Financial
Assistance
or Deed
Restrictions
Affordability by Household Incomes
Unit
Category
Tenure
R=Renter
O=Owner
Very
LowIncome
LowIncomeModerateIncome
Above
ModerateIncome
Total
Units
Est. #
Infill
Units*
Assistance
Programs
for Each
Development
Deed
Restricted
Units
SF O 235 317 0
Total of Moderate and Above Moderate 235 317 552
Total Extremely Low-Income Units 0
*Building permits issued from January 1, 2021 to December 31, 2021. New permits include 552 single family detached homes.

Page 157 of 1447 ends

ITEM 9.7. ATTACHMENT 1
2 0 2 1 G E N E R A L P L A N A N N U A L R E P O R T
13 T A B L E 4

RE G I O N A L H O U S I N G NE E D S AL L O C A T I O N P R O G R E S S 2021 2022 2023 2024 2025 2026 2027 2028 2029
Income Level
RHNA
Allocation
by Income
Level
Year
1 Year
2 Year
3 Year
4 Year
5 Year
6 Year
7 Year
8 Year
9 Total
Units
to
Date
(All
Years)
Total
Remaining
RHNA by
Income
Level
Deed
Restricted Very Low Non-Deed
Restricted
2,115 2,115
Deed
Restricted Low Non-Deed
Restricted
1,274 1,274
Deed
Restricted Moderate Non-Deed
Restricted
1,684
235 235
1,449
Above Moderate 3,994 317 317 3,677
Total RHNA by COG 9,067
Total Units 552
Remaining Need for RHNA Period 8,515

RE M O V A L O F GO V E R N M E N T A L C O N S T R A I N T S T O H O U S I N G The Housing Needs Assessment of the General Plan states that the development standards for residential development in the City do not constrain the development of new housing or affordable housing. It identifies significant constraints as generally being non-governmental, including high land and construction costs, lack of gap funding for affordable projects, and a variety of other market factors. The Citywide Zoning Code includes land use districts, regulations, and standards that allow for alternative housing products at higher densities and facilitate the provision of live-work units and mixed-use developments.

Page 158 of 1447 ends

ITEM 9.7. ATTACHMENT 2
1 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
I I – L A N D U S E E L E M E N T
LU

1.1.1 Regularly evaluate the mix of land uses as the City grows to analyze build out conditions, market conditions, etc. PL Ongoing GF On-going amendments to the Zoning Ordinance were completed in 2019.

LU.1.1.
2 Utilize the PLACE3S land use model to track General Plan implementation with respect to Land Use and analyze the impact of new development on existing uses and the City roadway network. Update the model on a quarterly basis with newly constructed development projects to maintain accuracy of the model.

PL Ongoing GF
Completed, but other resources are
also under consideration to determine
proper land use and their impacts. The
City launched a new permitting
system in August 2021.

LU.1.1.
3 Regularly update the General Plan Land Use Map and other related maps in the General Plan with the latest parcel information from the County’s Assessor’s Office, regardless of General Plan Amendment activity.

Updates to the parcel lines, when no adjustments have been made with respect to land uses.

PL Ongoing GF
The parcel and zoning maps have been
updated, the maps within the General
Plan have been relatively unchanged.

Recommend the City review the land
use map to look at possible LU
changes in 2022.

LU.1.1.
4 Amend the Zoning Code text to include the appropriate findings required for General Plan land use and text amendment requests. PL 2006 / 2007 GF Completed. ZC 23.155.040 LU

1.2.2 Designate adequate commercial, office, and industrial land uses throughout the City during project review and as part of annual review of the General Plan.

PL Ongoing GF
Ongoing. However, not part of the
annual GP reporting. Zoning
amendments will continue through the
2022 zoning code updates.

LU.1.2.
2 Establish a comprehensive plan for an economically viable mix of land uses in and around Mather Airport. PL / ED 2007 GF
Improvements have been completed to
the Mather area and new projects have
been approved to improve vitality in the
region. A comprehensive plan has not
been established that reviews the
economic viability of the land uses
included in the Mather SPA approved
by Sacramento County. The County is
working on an updated Mather Airport
Land Use Compatibility Plan
LU.1.3.
1 Identify target businesses and industries that diversify the City’s employment base and create incentives to locate in Rancho Cordova. ED Ongoing GF Ongoing, part of the annual plan. Jobs and Talent incentive program.

LU.1.3.
2 Designate new and existing office developments as mixed-use to encourage the compatible integration of residential and commercial retail and service uses in proximity to jobs.

PL 2006 /
2007 AF
Office uses are included within a mixed
use zone with some of these MU zones
allowing residential and/or light
industrial and retail uses.

Page 159 of 1447 ends

ITEM 9.7. ATTACHMENT 2
2 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
LU.1.4.
1 Establish performance and development standards in the Zoning Code and guidelines in the Citywide Design Guidelines to address compatibility between existing and proposed development and within proposed mixeduse development (vertical and horizontal).

PL 2006 /
2007 GF
On-going and completed.

LU.1.4.
2 Create development standards and design guidelines to specifically address the compatibility of high-rise development in the Downtown Planning Area. Give special consideration to those issues unique to highrise development, including the following: visual intrusion, distant viewshed, shadowing of adjacent properties, glare, wind tunnel effects, emergency service, interruption of electronic transmissions, traffic and parking, and noise and vibration. Recognize that urban (higher intensity) developments increase transit opportunities, increase walkability, and efficient land use, which lead to reduced automobile emissions.

PL / FD 2007 /
2008 GF
Not completed. Planning staff will
continue to work with the Fire, Public
Works, and Building departments to
assess existing standards as a
proactive solution.

LU.1.4.
3 Promote the disclosure of potential land use compatibility issues in all parts of the City, such as noise, dust, odors, etc., in order to provide potential purchasers with the information necessary to make informed decisions about the property and its future land uses.

PL 2006 /
2007 GF
Ongoing. The City offers and
encourages pre-application meetings
with developers and business owners
in order to improve communication and
potential disclosure.

LU.1.4.
4 Develop guidelines for the buffering of incompatible land uses in ways that retain community character but do not consume large land area, create pedestrian barriers, or result in unsafe conditions.

PL / PD 2006 /
2007 GF
Completed.

LU.1.4.
5 Minimize impacts between urban and agricultural uses through the use of buffers, increased setbacks, roadways, barriers, landscaping, and/or other appropriate methods to avoid conflicts.

PL 2007 /
2008 GF
Completed and implemented as part of
entitlement review.

LU.1.4.
6 Work with utility providers to coordinate location of transmission lines and substations during development review. PW / PL Ongoing GF On-going. The City coordinates with the utility providers LU.1.5.
1 Update the Zoning Code Text and Map to reflect new land use designations and distributions throughout the City as established in this General Plan.

PL 2006 /
2007 GF
Completed in 2019 and on-going.

LU.1.5.
2 Regularly audit, and update as necessary, any provisions of the Code that may be inconsistent with the General Plan and its subsequent amendments.

PL Annual GF
Ongoing.

LU.1.6.
1 Ensure master planned communities include the provision of public/quasipublic land preserved for civic uses. PL Ongoing AF / GF Completed and ongoing as part of entitlement review.

LU.1.6.
2 Create a site inventory identifying desired locations for a full service hospital. CM / ED / PL
2006 /
2007 /
2008
GF
Not completed. Through a Zoning
Code Amendment, Hospital use is
allowed within the Convention
Overlay District
LU.1.7.
1 When siting new transit-oriented developments: the development must be within one-quarter mile of a major transit stop; emphasize street-level neighborhood commercial services that serve many residents in PL Ongoing GF
Ongoing. The zoning code encourages
higher densities and more intense uses
within these corridors.

Page 160 of 1447 ends

ITEM 9.7. ATTACHMENT 2
3 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
surrounding areas; encourage employment in the urban transit-oriented development created along the transit route; create a pleasant walking environment through good land use design, short distances, amenities, and streetscape features; and provide direct, multiple linkages, especially for bicycles and pedestrians, to surrounding areas.

LU.2.1.
1 Amend the Zoning Code and Citywide Design Guidelines to include the City’s smart growth principles as appropriate. PL 2006 / 2007 GF On-going LU.2.2.
1 Identify the building block components of neighborhoods, villages, and districts in the existing areas of the City and encourage redevelopment using the building blocks principles.

PL Ongoing GF / AF
Not Completed. Requires coordination
with Public Works Street system to
identify these areas.

LU.2.4.
1 Establish, as a part of design review, a system or mechanism that evaluates the effectiveness of a proposed project in meeting these requirements (listed in LU.2.4).

PL 2006 AF
Achieved but not complete. LU 2.4.
involves project designs that ensure
safe pedestrian routes both on and off
site. Reviewed during project
entitlement.

LU.2.5.
1 Require market studies, financing plans, phasing plans, and other associated studies as needed as part of all new major development applications in order to evaluate the need for these projects, their compliance with established City policy, and the impact of the development on the City and service providers.

PL / F Ongoing AF
Phasing plans and financing plans are
required for master plans and specific
plans.. Staff reports include a “Fiscal
Impact” section that indicates the
potential benefit of a project taken
before the City Council.

LU.2.6.
1 As part of neighborhood project review, ensure that village centers are strategically located for accessibility to surrounding neighborhoods and retail viability. Village town center should ensure that neighborhoodserving commercial uses adjacent to residential areas provide quality, convenience, and community-serving retail choices in a manner that does not adversely impact neighborhood character.

PL / F Ongoing AF
Ongoing and completed.

LU.2.7.
1 Develop and adopt energy conservation performance standards that apply to new construction and focus on cost-effective measures that exceed minimum federal and state requirements, in recognition and support of the Sacramento Municipal Utility District’s “Conservation Power” goals.

PL / B 2007 GF
There are some policies for energy
conservation (especially in UBC).

There are no specific RCMC
codes/regulations. Currently, the City
enforces the provisions of the California
Energy Code, and the Building Energy
Efficiency Standards that are
referenced within.

LU.2.7.
2 Create programs that educate developers and property owners about the advantages of “green design” on their property and within the City, and inform them on how they can incorporate such design elements into their projects. Develop incentives, such as grants, financing programs, or other mechanisms that help make “green design” realistic.

PL / B / PIO 2007 GF
Building & Safety website page directs
developers and property owners to the
State Green Code website for the
requirements of the Green Building
Standards (CALGreen). The City of
Rancho Cordova Website was
updated in 2021.

Page 161 of 1447 ends

ITEM 9.7. ATTACHMENT 2
4 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
LU.2.8.
1 Amend the Zoning Code to include flexible parking standards and parking reductions to encourage compact development, shared parking, and higher density projects in specified locations throughout the City.

PL / PW 2006 /
2007 GF
Completed. ZC 23.719.090 includes
reductions. The Zoning Code parking
standards were amended in 2021 to
encourage adequate parking supply
for future uses but also ensure that
the City would not be overparked.

LU.3.1.
1 Identify and map target attractions and establish economic development policies and programs to attract these uses to the City. ED 2007 RAF Completed a business incentive program.

LU.3.2.
1 Establish specific policies, standards, and guidelines for quality design of all public and quasi-public uses. PL 2007 GF Contained with the DG and ZC for Article 5 and 23.722 LU.3.6.
1 All applications for annexations shall include a comprehensive land use plan for the affected territory, including pre-zoning and a plan for infrastructure financing and phasing. In considering applications for annexation, the City shall consider whether the annexation will accomplish all of the following:
- Constitute fiscally sound additions to the existing City; - Be consistent with state law and Local Agency Formation Commission policies, standards, and criteria;
- Preserve neighborhood identities;
- Ensure the provision of adequate municipal services;
- Be consistent with General Plan and Community Plan land use policies; - Incorporate smart growth principles for sustainable economic growth while maintaining environmental integrity and providing for social equity; and
- Promote fiscally sound, efficient service boundaries.

CM / PL Ongoing GF
The City did not receive an annexation
application in 2021.

All proposed annexations will meet LU

3.6.1 LU.4.1.
1 Establish and maintain agreements or working relationships with SACOG, Sacramento County, and the cities of Folsom, Sacramento, and Elk Grove to facilitate a coordinated approach to land use decisions that affect each jurisdiction.

CM Ongoing GF
Ongoing and completed.

LU.4.1.
2 Facilitate agreements (i.e. memorandums of understanding) for critical planning topics and activities with neighboring jurisdictions and SACOG and allow for shared responsibility and an equal voice for all participants CM Ongoing GF
Ongoing and complete.

LU.4.1.
3 Partner with other jurisdictions and agencies to create joint powers authorities that address issues of mutual concern (i.e. the American River Parkway) but still allow the City to maintain its voice and decision making authority throughout the process.

CM Ongoing GF
Ongoing and complete. (ie. Grantline
Road
LU.4.1.
4 Encourage neighboring jurisdictions to adopt and collect infrastructure impact fees (e.g. roadway impact fees) for all new development that will have an impact on the City infrastructure (e.g. roads)
CM Ongoing GF
Ongoing and complete.

Page 162 of 1447 ends

ITEM 9.7. ATTACHMENT 2
5 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
LU.5.1.
1 Encourage the upgrading, beautification, revitalization, infill development, and appropriate reuse of existing commercial areas and shopping centers. ED / PL Ongoing GF Established the sign and façade
program to assist businesses in making
façade and other onsite improvements.

LU.5.1.
2 Study, create, and implement streetscape enhancement plans that become catalyst projects for the revitalization of existing development. PW / PL Ongoing CIP / Grants Completed in 2020, Folsom Boulevard
improvements have improved the
corridor and encourage new
development to the area.

LU.5.1.
3 Seek improvement to existing infrastructure within residential areas of the City developed prior to incorporation that are not consistent with the City’s current standards.

PW
2006 /
2007 /
2008 /
2009
CIP /
Grants
Staff has identified the magnitude of
this extensive need and is making great
progress with complete streets
including bike and pedestrian facilities.

The City continues to address
improvements. 2021 examples
include the following: Pavement
rehab projects; streets, sidewalks,
notably Zinfandel and White Rock
Road; Sunrise Blvd. ADA ramps and
storm drainage improvements.

LU.5.2.
1 Conduct the studies and community input process necessary to determine the location and extent of needed redevelopment districts within the City. ED / PL 2006 GF / RAF RA for the city no longer exists. New
studies are being prepared to address
areas that require revitalization and
rehab.

LU.5.4.
1 Conduct infrastructure surveys and, where necessary, coordinate with utility providers to create infrastructure enhancement plans, which determine shortcomings in infrastructure that could inhibit the development of mixed-use projects in already developed areas of the City.

PW / PL / ED Ongoing GF / CIP
Complete and ongoing. Asset
Management database for streets.

Next phase is storm drainage.

Complete and on-going, Stormwater
Capital Improvement Program
Masterplan is Complete (Assesses
existing storm drainage system and
prioritizes the needed
improvements). Complete and ongoing, Local Road Safety Plan (provides a comprehensive safety
assessment of the City’s roads.

LU.5.5.
1 Conduct a survey of property within the Downtown to determine where potential land assembly issues may occur and work with property owners to actively solve the problem together, with mutual benefit.

ED / PL 2007 GF / RAF
Progress; however not complete as the
surveys have been completed on a
case by case basis, but not of all
properties to define the DTPA vision.

Folsom Blvd area to complete survey.

LU.5.5.
2 Survey property designated as a Transit-Oriented Development to determine where potential land assembly issues may occur and work with property owners to solve the problem. Coordinate access and right-of-way issues with the transit provider early in the process.

ED /PL 2007 GF / RAF
Ongoing.

Page 163 of 1447 ends

ITEM 9.7. ATTACHMENT 2
6 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
LU.6.1.
1 For lands within the Countryside/Lincoln Village, Sunrise Boulevard North, and Sunrise Boulevard South Planning Areas, require consistency between proposed development projects and the corresponding Planning Area descriptions and Land Plans.

PL Ongoing GF / AF
Ongoing.

LU.6.2.
1 Require the development and approval of Specific Plans or Special Planning Areas for the Aerojet, East, Glenborough, Grant Line North, Grant Line South, Grant Line West, Jackson, Mather, Rio del Oro, Suncreek/Preserve, and Westborough Planning Areas to create parcelspecific land use plans for those areas. Subsequent land use plans shall be consistent with relevant General Plan provisions and shall reflect the ideas communicated in the Conceptual Land Plans and associated planning area descriptions.

PL Ongoing GF / AF
Plans have been adopted with new
construction. Current market
demands have increased with the
submittal of new plans.

LU.6.3.
1 Consistent with the Downtown Planning Area, create a Downtown Specific Plan that fosters the creation and success of a Downtown Rancho Cordova.

PL
2006 /
2007 /
2008
GF
Incomplete. The GP adopted a
Downtown Planning Area (DTPA)
Boundary, but a Specific Plan has not
been achieved. The DTPA lacks detail
and contains multiple overlays (transit,
FBSP).

LU.6.4.
1 Develop, adopt, and implement a Folsom Boulevard Specific Plan that refines the vision and creates a detailed land plan with action steps for revitalization of the corridor. The Specific Plan shall include a land plan consistent with the vision and development envelope in the General Plan as well as the Planning Area description.

PL 2006 GF
Completed.

LU.6.4.
2 Analyze development projects proposed for the Folsom Boulevard Planning Area for consistency with the planning area description for the corridor.

PL Ongoing AF
Ongoing and complete.

I I I – U R B A N D E S I G N E L E M E N T
UD.1.1.
1 Amend the Zoning Code and Design Guidelines to be consistent with the urban vision. Select areas where a “form based” approach to zoning is appropriate.

PL 2006 /
2007 GF
Completed per DG and Article 5 of the
ZC.

UD.1.1.
2 Prepare and adopt guidelines and standards for residential dwellings in higher density development. Focus on maintaining livability through sensitive design that maintains privacy and minimizes conflicts between adjacent homes.

PL 2006 /
2007 GF
Completed. The adopted design
guidelines include standards for high
density development
UD.1.2.
1 Develop neighborhood street standards that promote walking and cycling to improve quality of life and transportation choices for residents. PW / PL 2006 GF Completed and ongoing. Includes PW
standards, master plan review, design
guidelines, and the zoning code.

UD.1.2.
2 Establish residential development design standards and guidelines that enhance the character and quality of projects. PL 2006 GF Complete as part of the Citywide Design Guidelines.

Page 164 of 1447 ends

ITEM 9.7. ATTACHMENT 2
7 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
UD.1.3.
1 Require the design of all residential projects with a grid or modified grid street system. PL / PW Ongoing AF
Complete. However, not applicable to
all projects that may have onsite
constraints that prohibit this design.

UD.1.3.
2 Allow for flexibility in the implementation of residential densities in a mixed density project. PL Ongoing GF Complete and ongoing. The GP and zoning includes density range.

UD.1.3.
3 Discourage the use of fences/walls/gates between compatible uses. PL Ongoing AF Complete and ongoing as part of the entitlement review process.

UD.1.5.
1 Continue to use, and update as necessary, the Citywide Design Guidelines as a starting point for encouraging developments that are interconnected and relate to one another.

PL Ongoing GF / AF
Complete and ongoing.

UD.1.5.
2 Revise the Zoning Code provisions to identify appropriate solutions to create compatibility between developments. The use of walls and fences to segregate uses does not inherently create compatibility.

PL 2006 /
2007 GF
Complete as part of our design
guidelines and integrated
developments (shopping centers).

UD.1.6.
1 Create development standards and update the Design Guidelines as necessary to ensure pedestrian-friendly village and local town center designs.

PL 2006 /
2007 GF
Complete and ongoing.

UD.2.2.
1 Amend the Zoning Code text and map to implement the new mixed-use designations in this General Plan. PL 2006 / 2007 GF Completed and ongoing.

UD.2.3.
1 Land uses along the eastern and southern boundaries of the City shall transition down the intensity and density of development from urban to rural at the City edge.

PL Ongoing AF
Completed. Uses consist of low density
housing and open space preserve.

UD.2.3.
2 Establish a gateway program to create a sense of entry at key locations throughout the City and promote wayfinding throughout the community.

Use creative designs that respond to the character and history of the City to establish a sense of place, including gateway signage, streetscape design, site landscaping, and other features. Users should feel a sense of arrival and be welcomed to the City.

PL / ED / PW 2007 GF / RAF /
CIP
Processing Gateway program;
Wayfinding signs. Finished Phase 1.

Phase 2 is complete.

UD.2.3.
3 Prepare and adopt design standards for pedestrian overcrossings of major roads that contribute to district character and defined gateways and promote wayfinding.

PL / PW 2006 /
2007 GF
Standards for at grade, above grade,
and under- crossing exist.

UD.2.4.
1 As part of the Design Review process, encourage the development of unified district themes with integrated streetscapes (including streetscape furniture), district-wide signage programs, unified architectural styles, and / or themes for a concentration of uses or open space programs.

PL / PW Ongoing AF
Part of the Entitlement Process.

UD.2.5.
1 Prepare and adopt a Downtown Specific Plan that addresses the future uses, design standards, street design, and other characteristics of the built form.

PL
2006 /
2007 /
2008

GF / RAF
Not Completed. The GP adopted a
Downtown Planning Area (DTPA)
Boundary, but a Specific Plan has
not been completed.

Page 165 of 1447 ends

ITEM 9.7. ATTACHMENT 2
8 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
UD.2.5.
2 Work with businesses, property owners, and other stakeholders to create a vital Downtown with pedestrian- and cyclist-oriented activities and design features.

ED / PL Ongoing RAF
Not Completed. The ZC includes
standards, but nothing specifically for
the DTPA.

UD.2.6.
1 Develop streetscape standards that define the character of the street and promote pedestrian mobility between individual uses. PW / PL 2006 / 2007 GF Complete.

UD.2.6.
2 Create standards for the type, spacing, etc. of trees along the street.

Require development to include street trees along all frontages of the project.

PW / PL 2006 /
2007 GF
Specific Plan…Complete. Landscaping
is located under 23.716 with plant and
irrigation standards under 22.180.

UD.2.6.
3 Establish standards for the use of street furniture, such as benches, light fixtures, and planters, as inviting and usable accent pieces along the street.

PW / PL 2006 /
2007 GF
Complete per DG and 23.722. Lighting
is within 23.725.

UD.2.6.
4 Define standards for the use and dimensions of separated sidewalks. PW 2006 / 2007 GF Complete.

UD.2.6.
5 Create enhanced medians with landscaping and lighting along corridors to promote district identity and unify individual developments. PW Ongoing CIP / Grants Ongoing
UD.2.6.
7 Promote the use of on street parking as an alternative to large parking lots.

Establish standards for size, location, and frequency of on-street parking spaces.

PW Ongoing AF
Ongoing
UD.2.6.
8 Develop and implement streetscape enhancement plans for Folsom Boulevard, Coloma Road, Sunrise Boulevard, Mather Field Road, and other roadways of community importance.

PW
2006 /
2007 /
2008
CIP /
Grants
Folsom Boulevard Streetscape
Enhancements Phases I to V are
completed. Sunrise Blvd Folsom
Blvd to White Rock Road is
complete. The Mather Field Road
Improvement is under design, with
construction anticipated to be
complete in 2022.

UD.3.1.
1 Develop provisions in the Citywide Design Guidelines that illustrate how projects with architectural styles and / or themes can be designed successfully.

PL 2006 GF
Completed and Ongoing.

UD.3.1.
2 Require projects to include features and attributes that positively contribute to the image of the City. PL Ongoing AF Completed and Ongoing.

UD.3.1.
3 Require development projects to use quality materials that are long lasting to ensure a sense of permanence for each project. PL Ongoing GF Completed and Ongoing.

UD.3.2.
1 Prepare and adopt standards and guidelines for the development of interconnected walkways, pedestrian amenities (e.g. seating, lighting, signage, landscaping), plaza areas, outdoor spaces, and commuter amenities (e.g. covered bus stops) oriented toward the pedestrian user.

PL / PW 2006 /
2007 GF
Completed and Ongoing. Design
guidelines and zoning code outlines
examples.

UD.3.2.
2 Amend the City’s Street Design Standards to include design elements that establish priority for pedestrians at road and drive aisle crossings through PW / PL 2006 GF Complete per the Design Guidelines,
zoning code, and public works
standards.

Page 166 of 1447 ends

ITEM 9.7. ATTACHMENT 2
9 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
pavement markings, differentiation in the pavement surface, and/or signage.

UD.3.2.
3 Prepare and adopt standards and guidelines for the orientation of commercial and mixed-use buildings, which should be close to the street with parking behind or on the side of the development and easily connected to the pedestrian- and cyclist-oriented public streetscape.

Consider incorporating such provisions within a “form based” code in appropriate locations around the City.

PL 2006 GF
Completed and ongoing. Per the
pedestrian master plan and pedestrian
gathering space standards in zoning
code 23.722
UD.3.2.
4 Prepare and adopt standards for cyclist-triggered lights that allow cyclists to move about the community efficiently. PW 2006 GF / CIP The City continues to receive grants for
bicycle detection systems at traffic
signals city-wide.

UD.3.3.
1 Prepare and adopt guidelines for the design and integration of meaningful public spaces within commercial and mixed-use projects. PL 2006 / 2007 GF Included within the specific plan and
zoning code, with examples in the
Design Guidelines.

UD.3.3.
2 Require landscaping to be meaningful in nature, relating to the style and scale of the development and contributing to the look and feel of the City and district. Give consideration to how landscaping will mature over time.

PL Ongoing AF
Completed and ongoing as part of the
entitlement and building review
process.

UD.3.3.
3 Require site furniture that is uniform across the development and encourage furniture that is consistent across entire districts. PL / PW Ongoing AF Not complete. However, design
examples exist within the specific plan
and design/open space guidelines.

UD.3.3.
4 Prepare and adopt standards for project signage that promote the creation of a unique character for the project while respecting the impact of signage on neighboring properties and uses.

PL 2006 /
2007 AF
Not complete. However, standards
exist for sign design review.

UD.3.4.
1 Develop a Citywide public art program that directs the inclusion of art in private projects and coordinates the use of art in public projects. ED/PL 2007 GF The document is an action-oriented
strategic plan describing programs
and projects to assist in achieving
the vision. Since the plan’s
adoption, staff and the arts
community have worked to
implement the Arts Strategic Plan.
 Provided local art display
opportunities
 Art, events, and cultural
experiences in neighborhood
greens
 Creation of murals and
decorative signs
 Created artistic community
gateways
 Promotion and visibility of the
arts

Page 167 of 1447 ends

ITEM 9.7. ATTACHMENT 2
10 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
 City Hall improvements include
sconce wall lighting and an
improved sound system
 Completed the pilot Utility Box
Art Wrap program with local
artists and vendors
 Supported community art
events, festivals, concerts, and
activities
 Expanded events at the MACC
 Installed art along the Art Block
 Sponsored pop-up concert
venues
 Funded mobile art classes for
youth
 Provided grants to artists,
schools, and nonprofits to
expand the arts experiences in
Rancho Cordova
 Provided grants to create or
enhance black box theatres,
additional rehearsal space, more
functional gallery space, and
other facility improvements to
build upon the art venues in
Rancho Cordova
UD.4.2.
1 Develop standards and guidelines that require and illustrate compatibility between new and existing development. PL 2006 GF
Completed and ongoing. Per the
pedestrian master plan and pedestrian
gathering space standards in zoning
code 23.722
UD.4.3.
1 Remove barriers to infill projects by improving existing infrastructure to accommodate new development and increases in service demands. PL / PW/ B Ongoing CIP / Grants Complete and ongoing.

UD.4.3.
2 Provide incentives that allow for higher density and intensity of development, including how to streamline the permitting process. PL / PW / B Ongoing GF Complete and ongoing.

UD.4.3.
3 Require infill projects to comply with the City’s smart growth principles and building blocks concept. PL Ongoing AF Complete and ongoing.

UD.4.3.
4 Review how proposed projects interface with existing development and ensure that the interface is positive and meaningful. PL Ongoing AF Complete and ongoing. Part of the entitlement process.

Page 168 of 1447 ends

ITEM 9.7. ATTACHMENT 2
11 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
UD.4.3.
5 Work with property owners of existing development on potential remodel/reuse of their sites so that they may become catalysts projects for development and redevelopment in the City.

ED / PL Ongoing GF
Complete and ongoing. Working on
Folsom Blvd area. Purchased 10599
Folsom Blvd parcel.

UD.4.3.
6 Consider the development and adoption of pattern books/building prototypes of desired development and design solutions. These patterns/prototypes would be pre-approved for expedited permit review and building permit issuance.

PL 2006 /
2007 GF
Not complete.

UD.4.4.
1 Promote streetscape enhancement projects, as described in UD.2.4.6, as catalysts for change. PW / ED Ongoing CIP / Grants
Complete and ongoing. Folsom
Boulevard Streetscape Enhancements
Phase I to V were completed in 2020.

UD.4.4.
2 Work with property owners to coordinate development activities over multiple sites to help create integrated projects with common design features.

ED / PL Ongoing AF
Ongoing.

UD.4.5.
1 Encourage the development of major streets, trails, and significantly sized public spaces that preserve and take advantage of vistas. PW / PL Ongoing GF / CIP Ongoing. The Ranch SPA includes a
major east west street, trails and a
large preserve area. The Preserve
Project- a 277-acre site proposed for
single-family development sets
aside 66% of the property as an
open space preserve. The
community also includes a trail
system connecting the
neighborhood to the park system
which borders Morrison Creek.

UD.4.5.
2 Update the Citywide Design Guidelines to address viewsheds and vistas. PL 2006 GF References are included in the DG. .

I V – E D E L E M E N T
ED.1.1.
1 Identify key locations for transformation of existing office and retail uses to mixed-use projects that incorporate other supportive uses within large employment areas, at pulse points along Folsom Boulevard and within one-quarter mile of a major transit stop.

ED / PL 2006 GF
Completed and ongoing.

ED.1.1.
2 Target underutilized and vacant sites throughout the City that may be more adequately suited for other uses or a combination of uses that would be vibrant and successful
ED / PL Ongoing GF
Completed and ongoing.

ED.1.1.
3 Continue annexing land within the Planning Area to secure an adequate supply of land for future development, consistent with LAFCo proceedings. CM / PL Ongoing GF Completed with new land along Folsom
Boulevard. Nothing has been annexed
since 2012.

Page 169 of 1447 ends

ITEM 9.7. ATTACHMENT 2
12 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ED.1.2.
1 Offer incentives to business owners and property owners for improving the appearance of aging shopping centers and retail space. ED / PL Ongoing

GF / RDA /
private /
CDBG
Completed and ongoing as the sign
and façade program was approved in
2017
ED.1.2.
2 Work with the owners of Class B and large floor-plate office buildings to update their office space to attract new businesses. ED Ongoing RDA / private Ongoing and included in 2016 Strategic
Plan Update.

ED.1.2.
3 Actively promote new Class A office development that serves high-end office users and provides signature building office users. ED Ongoing GF / RDA funds Ongoing and included in 2016 Strategic
Plan Update. UCD Health C-Suite
office located within 2 Office Bldgs,
totaling 260,000 sqft.

ED.1.2.
4 Actively promote new office development with smaller individual and cooperative spaces to provide new opportunities for an expanding demand currently unmet in the City.

ED Ongoing
RDA /
CDBG /
private
Ongoing and included in 2016 Strategic
Plan Update.

ED.1.2.
5 Offer incentives for new office development or redevelopment that provides on-site amenities to employees. ED / PL Ongoing / PR RDA /
CDBG /
private
Completed and ongoing.

ED.1.3.
1 Work with local brokers, developers, and the Chamber of Commerce to establish clusters and districts of similar uses for home improvement centers, specialty building materials show rooms, furniture retail, manufacturing and high-tech industries to further diversify the economy.

ED Ongoing GF / RDA
Ongoing and included in 2016 Strategic
Plan Update.

ED.1.3.
2 Develop an attraction and retention program for companies that provide business-to-business (B2B) sales tax revenue to the City (e.g., business services, electronic equipment, light industrial, etc.). These companies are best suited to business parks and areas of the City with heavy industrial and light industrial designations.

ED 2007 /
2008

GF / RDA /
Chamber
Ongoing and included in 2016 Strategic
Plan Update. Included on economic
annual plan
ED.1.6.
1 Collaborate with local business, merchant associations, and the Chamber of Commerce to promote and advertise local events. ED Ongoing GF / RDA / Chamber Ongoing and included in 2016 Strategic
Plan Update.

ED.1.6.
2 Establish permanent information kiosks and event sign structures in strategic locations throughout the community to promote and advertise local events.

ED / CM
2006 /
2007 /
Ongoing

GF / RDA /
Grants
Waiting on final locations
ED.1.6.
3 Work with the Rancho Cordova Chamber of Commerce to identify potential tourism-oriented market opportunities and to develop stronger links to regional and national tourist markets.

ED / CM Ongoing GF / RDA /
BIDs
Complete and ongoing.

ED.1.7.
1 Create and maintain an economic development web page on the City’s Web Site with pertinent economic and demographic information, as well as profiles of key development sites and vacant buildings available for new businesses.

ED / PIO Ongoing GF / RDA
Complete and ongoing. The City of
Rancho Cordova Website was
updated in 2021.

ED.1.7.
2 Create a Community Data Book with up-to-date information on available sites to attract businesses to Rancho Cordova. ED / PIO 2006 /
2007 /
Ongoing

GF / RDA
Information on ED Website and RCTT
website. The City of Rancho Cordova
Website was updated in 2021.

Page 170 of 1447 ends

ITEM 9.7. ATTACHMENT 2
13 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ED.1.7.
3 Institute a zoning incentive program that may include flexible development standards, fast track processing, etc. for target uses and infill development.

PL 2006 /
2007 GF
Completed and ongoing for flexibility in
code. Planning will work with ED for
more incentives.

ED.1.7.
4 Establish a Development Review Committee or Technical Advisory Committee to provide expedited review of development applications for targeted projects.

PL / PW / ED 2006 GF / AF
Completed
ED.1.7.
5 Continually monitor the redevelopment and economic development strategies to determine their effectiveness in encouraging economic diversity, and adjust policies and incentives when necessary.

ED / PL Ongoing GF / RDA
Ongoing and included in 2016 Strategic
Plan Update.

ED.1.7.
6 Offer incentives as part of the Rancho Cordova ED Strategy and Action Plan (e.g., fee waivers and deferrals, low interest loans, façade improvements, assembling properties, etc.) that can be used to attract businesses.

ED Ongoing GF
Included in 2016 Strategic Plan
Update, programs developed
ED.1.9.
1 Work with the Sacramento Sports Commission and Cordova Recreation and Parks District to identify opportunities for new sports facilities in Rancho Cordova that will be capable of hosting major sports events.

ED / CM
2007 /
2008 /
Ongoing
GF
Partner with RCTT and CRPD
ED.1.9.
2 Evaluate the economic return and investment by the City for a major sports center or arena. ED
2007 /
2008 /
Ongoing
GF
Will conduct when project arises.

ED.1.9.
3 Collaborate with the Sacramento Sports Commission and Cordova Recreation and Parks District to program existing and new parks and recreational facilities to their maximum potential (e.g., Mather Field Park, Sacramento Sports complex on Folsom Boulevard, etc.).

ED / CM
2006 /
2007 /
Ongoing
GF
Ongoing
ED.1.9.
4 Work with the Chamber of Commerce’s Visitor and Tourist Bureau to develop a strategy for attracting sports events to Rancho Cordova. ED / CM 2007 /
2008 /
Ongoing
GF
Responsibility of RCTT
ED.2.1.
1 Work with project proponents to locate retail uses within residential projects in appropriate locations and at the appropriate scale to serve local and community retail needs.

PL / ED Ongoing /
PR AF
Complete and ongoing.

ED.2.1.
2 Work with the Chamber of Commerce, Rancho Cordova Regional Economic Development Corporation, the City’s Economic Development Committee, local brokers and developers to attract companies that will serve Rancho Cordova’s specialty retail, regional and super regional needs (e.g., electronics, home décor, crafts and art, fashion-oriented department stores, children’s stores, beauty and spa, auto dealers, shopping and entertainment centers, and specialty building materials, bigbox home improvement), and other amenities to serve the community (e.g., restaurants, coffee shops, specialty businesses, ethnically diverse enterprises, and services).

PL / CM Ongoing GF / RDA
Complete and ongoing.

ED.2.1.
3 Promote and support specialty businesses and ethnically diverse enterprises throughout the City. ED Ongoing GF / RDA Complete and ongoing. KP international plaza and approved in

Page 171 of 1447 ends

ITEM 9.7. ATTACHMENT 2
14 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
2020, SF Supermarket Plaza is under
construction in 2021.

ED.2.2.
1 Amend the Zoning Code to include flexible zoning standards for the redevelopment of office and industrial sites with supportive services (e.g., allowed uses, setbacks, parking).

PL 2006 /
2007 GF
Completed per MU zoning standards.

These standards contain setbacks,
FAR, and by right allowance for most
office uses.

ED.2.3.
1 Review development proposals to determine if the proposed uses are consistent with the Rancho Cordova Retail Strategy in terms of type of retail, access, visibility and benefit to Rancho Cordova.

PL / ED Ongoing AF
On-going
ED.2.3.
2 Work with businesses, Regional Transit and other transit providers to locate appropriate uses near transit. PL / PW Ongoing GF Ongoing.

ED.2.5.
1 Improve and expand the shopping opportunities in Rancho Cordova by taking the following steps:
- Conduct a survey of existing shopping centers to identify problem stores and centers.
- Work with storeowners to clean up the existing stores and shopping centers.
- Attract new retail to Rancho Cordova through marketing and economic development efforts.
- Provide assistance to smaller merchants through merchandizing training.
- Encourage cooperative marketing of Rancho Cordova shops (e.g., Secret Shopper).

ED
2006 /
2007 /
Ongoing

GF / RDA
Sunridge Plaza center nearly complete.

Improvements continue to be made to
the Rivergate and Zinfandel Village
shopping centers. Stone Creek
Village approved in 2021. Anatolia
Plaza/Marketplace is under
construction
ED.3.1.
1 Locate government offices, compatible public services, and public gathering places in Downtown Rancho Cordova. PL / CM Ongoing GF / RDA / taxes The new City Hall is within the
downtown planning area and
improvements, such as Zinfandel
Drive interchange, have been made to
both sides of Hwy 50 within the
planning area.

ED.3.1.
2 Prepare a Downtown Marketing Plan that targets potential new businesses, including restaurants, upscale retail, high quality commercial, and entertainment venues.

ED / F 2006 /
2007 GF / RDA
Not Completed.

ED.3.1.
3 Work with local businesses and property owners to create a Business Improvement District (BID) in Downtown Rancho Cordova. ED / F 2008 / 2009 GF Not completed due to lack of property owner interest.

ED.3.1.
4 Adopt a Rancho Cordova Downtown Implementation Plan or Downtown Specific Plan that identifies appropriate land uses, incentives, development standards, and design provisions.

ED / PL 2007 /
2008 GF
Not Completed. The GP adopted a
Downtown Planning Area (DTPA)
Boundary, but a Specific Plan has
not been completed.

ED.3.1.
5 Identify specific factors for measuring Downtown’s economic diversity and financial success (e.g., tax increment growth, new square footage, number of new businesses, new infrastructure projects, etc.).

ED Ongoing GF
On hold until downtown location is
determined

Page 172 of 1447 ends

ITEM 9.7. ATTACHMENT 2
15 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ED.3.1.
6 Offer incentives that attract targeted uses and high quality buildings and architecture in Downtown Rancho Cordova. ED / PL / PW Ongoing

GF / RDA /
sewer credit
program /
CDBG /
loans
Included in 2016 Strategic Plan Update
ED.3.1.
7 Support the development of specialty food stores and restaurants in the Downtown to serve Rancho Cordova employees and to meet the needs of the region’s diverse population, as well as the needs of the growing number of visitors to the area.

ED / PL Ongoing GF
Included in 2016 Strategic Plan Update
ED.3.1.
8 Encourage the development of new retail services in Downtown Rancho Cordova for which an unmet demand clearly exists. ED / PL Ongoing GF Included in 2016 Strategic Plan Update ED.3.1.
9 Foster mixed-use development with multi-family residential and commercial uses in Downtown to provide alternative housing opportunities for the community.

ED / PL / H Ongoing GF
Working with developers on potential
projects
ED.3.1.
10 Enhance Rancho Cordova’s image and quality of life through investment in the Downtown, neighborhoods, commercial districts, parks, open spaces, community facilities, and services, and creating a high level of perceived safety and a business-friendly government.

ED / PL Ongoing GF
Included in 2016 Strategic Plan Update
ED.3.1.
11 Create economic development strategies to support the Downtown vision including, but not limited to:
- Evaluating infill opportunities for underutilized parking lots. - Encouraging increased lot coverage, density and intensity. - Encouraging structured parking and increased lot coverage.

ED / PL 2007 /
2008 GF
On hold until project location is
determined
ED.3.2.
1 Work with business and property owners in the Downtown to redevelop and improve their properties, update their architecture and facades, landscaping, parking and pedestrian amenities.

ED Ongoing RDA / grant
/ CDBG
Ongoing for entitlement and building
permit review. Façade grants will assist
owners in making improvements.

ED.3.2.
2 Create incentives for new development and redevelopment in the Downtown with increased density and intensity of development. ED / PL Ongoing GF / RDA Incentives have been created city wide ED.3.2.
3 Pursue the development of shared parking structures within the Downtown. ED / PL Ongoing GF Ongoing
ED.3.2.
4 Coordinate with the Public Works Department to complete an assessment of infrastructure deficiencies in the Downtown and along Folsom Boulevard and ensure that infrastructure is adequate to support planned intensity and density of land uses.

ED / PW Ongoing GF / CIP
Ongoing. There is no DTSPA; however
Public Works has completed
improvements to Folsom Blvd.

Completed Zinfandel Drive and
overpass in October 2020.

ED.4.1.
1 Determine the appropriate type and scale for a Rancho Cordova Convention Center, based on a sound market analysis and appropriate public and private investment.

ED 2006 /
2007 GF
Ongoing
ED.4.1.
2 Work with the high-tech businesses in Rancho Cordova and the region, as well as convention center designers, to make sure the Rancho Cordova CM / ED 2007 / 2008 GF Will be completed once a project is imminent

Page 173 of 1447 ends

ITEM 9.7. ATTACHMENT 2
16 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
Convention Center has state-of-the-art technology and high-tech connectivity to serve the needs of future users.

ED.4.1.
3 Attract new hotel development to Rancho Cordova that will support conferences and entertainment venues. ED / CM Ongoing GF On-going.

ED.4.1.
4 Review development proposals for land within the Convention Overlay for consistency with the City’s desires for a convention center with conference and meeting spaces, hotels, and restaurants.

PL Ongoing AF
On-going.

ED.4.1.
5 Promote a common architectural theme and other unifying elements within the Convention Overlay. PL Ongoing GF
Defined within the Folsom Boulevard
Specific Plan design standards for the
area.

ED.4.1.
6 Attract fine arts, cultural and performance venues to Rancho Cordova. CAC / ED / PL Ongoing GF / Grants
In December 2019, the City Council
adopted the City of Rancho Cordova
Arts Strategic Plan that was developed
based on direction from the City
Council and input from stakeholder
organizations and individuals, including
students. The document is an actionoriented strategic plan describing programs and projects to assist in
achieving the vision. Since the plan’s
adoption, staff and the arts community
have worked to implement the Arts
Strategic Plan.

ED.4.1.
7 Review development proposals for land within the western portion of the Convention Overlay designation to permit transitional uses from the Downtown Planning Area, such as research and development, retail, restaurant and professional office, as well as higher density residential to support primary uses in the Convention Overlay and Downtown areas and in keeping with the vision and subsequent planning efforts for those areas.

PL / ED Ongoing AF
Ongoing, work to be completed as
proposals submitted
ED.4.1.
8 Encourage residential development in appropriate locations in the Convention Overlay area to support convention, hotel, restaurant and other convention-related uses, including housing for all economic levels.

PL / ED Ongoing GF / AF
A new hotel opened within the
Convention Overlay area. PW has
completed numerous improvements to
Folsom Boulevard.

ED.5.1.
1 Adopt the Rancho Cordova Redevelopment Plan and realize the Agency’s Five-Year Implementation Plan. ED / RA 2006 / 2011
RDA /
private /
CDBG /
Grants /
EPA
The RC Redevelopment agency has
been dissolved.

ED.5.1.
2 Work with developers to attract private investment to redevelopment sites. ED Ongoing GF / RDA Included in 2016 Strategic Plan Update

Page 174 of 1447 ends

ITEM 9.7. ATTACHMENT 2
17 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ED.5.1.
3 Supplement private and public funds through use of Community Development Block Grants and other outside funding mechanisms whenever possible to stimulate economic development in the City.

ED Ongoing
Private /
CDBG /
Grants /

PW / EPA
To be utilized as needed
ED.5.1.
4 Survey physical, social, and economic conditions on a regular basis to identify other potential redevelopment areas. ED Ongoing

GF / RDA /
private /
RDA /
CDBG /
Grants /

PW / EPA
Included in 2016 Strategic Plan
Update. However, Redevelopment
Agency has been dissolved.

ED.5.1.
5 Use the Redevelopment Plan to upgrade infrastructure and the streetscape. ED / RA Ongoing GF / RDA / CDBG
The RC Redevelopment Agency has
been dissolved.

ED.6.1.
1 Review development and redevelopment proposals for consistency with the Folsom Boulevard Specific Plan. PL Ongoing / PR AF Complete and ongoing.

ED.6.1.
2 Work with property owners and business associations to improve commercial areas along Folsom Boulevard, including their viability, appearance, cleanliness, and accessibility.

ED Ongoing

RDA / GF /
RDA /
private
(BID) /
CDBG /
Grants /
PW
Ongoing. The City Folsom Boulevard
streetscape improvements are
complete.

ED.6.1.
3 Discourage the underutilization of properties along Folsom Boulevard by offering incentives for redevelopment and intensification of uses and densities at key locations along the corridor to create the desired pulse points of activity and intensity.

ED Ongoing
RDA /
Grants / GF
/ RDA /
private
(BID) /
CDBG
Included in 2016 Strategic Plan Update
ED.6.3.
1 Coordinate with the development community and Redevelopment Agency to identify landowners willing to partner, sell, and / or redevelop their property to achieve greater economic and community benefit.

ED / PL / RA Ongoing GF
The RC Redevelopment Agency has
been dissolved.

ED.6.3.
2 Encourage the use of mixed-use zoning categories, land use designations, transit-oriented developments, and districts along Folsom Boulevard consistent with the Folsom Boulevard Specific Plan.

PL / ED
Ongoing /
Specific
Plan

RDA / AF
Complete – Folsom Blvd. Specific Plan
created.

ED.6.3.
3 Through land use planning and zoning, establish nodes of commercial activity with new residential, office, and support services. PL Ongoing RDA GF Outlined within the adopted zoning map.

ED.6.4.
1 Use street corridor improvements as catalysts for economic revitalization along Folsom Boulevard. ED / RA / PW
Ongoing /
Specific
Plan /
RDA Plan
RDA /

CDBG / PW
/ Grants
The City has completed over $25mil of
improvements to Folsom Boulevard.

Page 175 of 1447 ends

ITEM 9.7. ATTACHMENT 2
18 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ED.7.1.
1 Maintain an inventory of vacant and underutilized land designated for commercial, industrial, or residential uses and identify opportunities for infill development.

ED / PL
2006 /
2007 and
Ongoing

GF / EPA
Grants
Completed and ongoing as updates are
required to assess development
potential.

ED.7.1.
2 Target key underutilized or vacant parcels and buildings for rapid development and / or redevelopment, consistent with the other policies in this General Plan.

ED Ongoing EPA Grants
/ GF
Included in 2016 Strategic Plan Update
ED.7.1.
3 Develop guidelines for adaptive reuse of commercial, industrial, and office buildings on infill sites, including using these buildings as “live / work” studios.

PL / ED 2007 /
2008 GF
On-going
ED.7.1.
4 Adopt an infill policy. PL / ED Ongoing GF Some progress has been made, but will continue as new opportunities arise.

ED.7.2.
1 Establish focused public investment areas, where the City will take a more proactive role in providing basic infrastructure and shaping growth for infill sites.

ED / F / RA Ongoing

GF / CIP /

CDBG / PW
/ Grants
On-going. Continue working with
Public Works as projects arise
ED.7.2.
2 Create a fiscal analysis to determine “Return On Investment” (ROI) for each project. F
2006 /
2007 /
Ongoing

GF / AF
Completed on new Specific Plans 2012
forward
ED.7.3.
1 Prioritize and expedite the development review process for infill and redevelopment projects by streamlining the project evaluation and permitting to avoid unnecessary delays.

PL / PW / ED
2006 /
2007 and
ongoing
GF and AF
Not completed, currently working on a
case-by-case basis.

In 2021, the City adopted the
Multifamily Housing Streamlined
Design Review Permit process to
streamline review of multifamily
developments that are determined to
substantially comply with the
multifamily design guidelines.

ED.7.3.
2 Within the Zoning Code establish provisions that provide flexibility for infill site development. PL 2006 / 2007 GF Complete as part of the zoning code and Folsom boulevard SPA updates.

ED.7.3.
3 Use density bonuses and other incentives to stimulate infill development in target areas. ED Ongoing
GF /
waivers /
credits /
loans /
Grants /
private
(BID) /

CDBG / PW
Utilized as needed
ED.8.1.
1 Provide labor market information to local educational institutions and youth and adult training agencies for planning and curricula purposes on an annual basis.

ED Ongoing /
Annually
GF /
education
funds /
Grants
Ongoing, as needed

Page 176 of 1447 ends

ITEM 9.7. ATTACHMENT 2
19 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ED.8.1.
2 Work with local educational agencies to promote the value of education, especially among youth with limited family history of higher education, in support of vocational training programs.

ED Ongoing
GF /
education
funds /
Grants
Ongoing, with Folsom Cordova
Community Partnership
ED.8.1.
3 Facilitate catalyst projects by bringing together key organizations to expand vocational and technical programs in secondary schools. ED Ongoing GF /
education
Grants /
funds
Ongoing, as needed. Measure H
Promise Program.

ED.8.1.
4 Promote and expand business activities that support schools, such as school partnerships, City student internships, faculty internships, and job shadowing.

ED Ongoing
GF /
education
Grants,
funds
Ongoing, as needed
ED.8.1.
5 Foster an on-going connection with existing industries to retain businesses by effectively responding to concerns. ED Ongoing GF Included in 2016 Strategic Plan Update ED.8.2.
1 Work with the Chamber of Commerce, Rancho Cordova Regional ED Corporation and local businesses to support “jobs first” and “first hire” programs to optimize hiring Rancho Cordova residents.

ED / RA Ongoing GF
Ongoing
ED.8.2.
2 Attract higher educational facilities, post high school training, and medical facilities to Rancho Cordova. CM / ED Ongoing
GF /
education
Grants /
funds
On-going. Folsom Lake College,
Rancho Cordova Phase 2 will be
under construction.

V – H O U S I N G E L E M E N T
On
December 16th, 2013, City Council adopted the 2013-2021 Housing Element Update of the City's General Plan. The policies and action items contained in that update supersede those of the original General Plan adopted in 2006. The summary of 2013-2021 Housing Element is discussed in the supplemental Housing Element Status Update 2015. The update for the 2021-2029 Housing Element is currently in the process.

V I – C I R C U L A T I O N E L E M E N T
C.1.1.1 Review and update the City’s roadway cross-sections and design standards that implement the roadway types shown in the Circulation Plan. PW 2006 GF Complete Streets standards were completed in 2006 C.1.1.2
Require the dedication of right-of-way and the installation of roadway improvements as part of the review and approval of development projects.

Require the dedication of major road rights-of-way (generally, for major roads and thoroughfares) at the earliest opportunity in the development process.

PW / PL Ongoing AF / GF
Complete and on-going.

Page 177 of 1447 ends

ITEM 9.7. ATTACHMENT 2
20 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
C.1.1.3
Require the dedication of additional right-of-way for intersection improvements where features such as grade separations are planned, unless otherwise approved by the City Engineer.

PW / PL Ongoin
g
AF /
GF
Complete and on-going.

C.1.1.4
Require all development projects that must perform new roadway construction or road widening to complete the entire roadway to its planned width from curb-to-curb prior to the operation of the project for which the improvements were constructed, unless otherwise approved by the City Engineer. Such roadway construction must also provide facilities adequate to ensure pedestrian safety as determined by the City Engineer.

PW / PL Ongoin
g
AF /
GF
Roadway phasing will be
required in the newly developing
area. PW is requiring that any
phased street is a complete
street.

C.1.1.5
Require development projects to provide funding or to construct roadway / intersection improvements to implement the City’s Circulation Plan. At the City’s discretion, consider the payment of established traffic impact or similar fees to provide compliance with the requirements of this policy with regard to those facilities included in the fee program, provided that the City finds that the fee adequately funds all required roadway and intersection improvements. If payment of established fees is used to provide compliance with this policy, the City may also require the payment of additional fees if necessary to cover the fair share cost of facilities not included in or fully funded by the fee program.

PW / PL Ongoin
g
AF /
GF
The Transportation
Development Impact Fee is
established and projects are
monitored for additional fair
share cost requirements.

C.1.1.6
Space major roadways approximately one mile apart and connector roads one-half mile apart to increase route choice and improve vehicular circulation.

PW Ongoin
g
AF /
GF
The city-wide Arterial Master
Plan is completed.

C.1.2.1
Adopt, and update as necessary, guidelines for the preparation of traffic impact analysis for proposed development projects. Items to be addressed may include the following:
- Guidelines for determining when traffic analysis is required; - Guidelines for the preparation of traffic analysis; and - Significance criteria for use in CEQA analysis of proposed projects.

PW 2006 /
2007 GF
Traffic Impact Guidelines are in place
along with CEQA significance criteria.

C.1.2.2
Adopt, and update as necessary, a list of circulation improvements, including roadway improvements, pedestrian and bicycle facilities, and transit-related improvements, which the City will accept as offsets for congestion in accordance with this policy.

PW Annual CIP
The roadway circulation plan is in place
and Transit, Bicycle and Pedestrian
Master Plans are completed. The City
is preparing a Local Road Safety Plan
that will provide a comprehensive
safety assessment of the City’s roads.

C.1.3.1 On a regular basis, monitor existing traffic on roadways within and adjacent to the City. PW Ongoing
GF
The City has a traffic count monitoring
program. The Traffic Management
Center was completed in 2017.

C.1.3.2
Continue to update and refine the Citywide traffic model and use the model to project future traffic conditions based on existing and planned land uses within the City and in the region.

PW Ongoing GF
Several city-wide modeling efforts have
been completed.

Page 178 of 1447 ends

ITEM 9.7. ATTACHMENT 2
21 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
C.1.3.3
Adopt, and update as necessary, a list of roadways on which the City will not seek to achieve Level of Service D. This list may designate the Level of Service, which will be accepted on each roadway.

PW 2006 /
Ongoing CIP
The current list of roads that will not
meet LOS standards includes Sunrise
Boulevard and Folsom Boulevard. The
list may be expanded with the GP
update.

C.1.8.1
Implement, and update as necessary, the Neighborhood Traffic Management Plan and the tools for implementing traffic calming in neighborhoods.

PW 2006 GF
The NTMP is in place and produces
ongoing traffic calming projects. Phase
5 project is complete. Phase 6 is in
the Design stage.

C.1.9.1
Consider the preparation and adoption of a Trip Reduction Program that identifies ways in which automobile traffic and congestion can be reduces as a way to improve mobility within the City.

PW 2006 /
2007 GF
The City partners with the 50 Corridor
TMA to provide these services and the
City has initiated the CordoVan.

C.1.9.2 Encourage development projects, major employers, and schools to incorporate/participate in trip reduction programs. PW Ongoing GF Participation with the 50 TMA is a standard condition of approval.

C.1.10.
1 Incorporate maximum block length standards into the City’s street design and/or improvement standards. PW 2006 GF Complete
C.1.10.
2 When blocks are designed at lengths greater than 800 feet, design shall include mid-block pedestrian and emergency vehicle connections. PW Ongoing AF / GF Enforced during the small lot tentative map improvement plan process.

C.1.11.
1 Include funding in the City’s Capital Improvement Plan (CIP) to construct the pedestrian and bicycle components of the roadway improvement. PW 2006 /2007 GF / CIP Bike, Ped and Transit elements are
included in the Transportation Fee
Program.

C.2.3.1
Require pedestrian circulation routes to be designed into all land plans and subdivisions to ensure that access for the pedestrian is provided.

Pedestrian routes shall be interconnected and may include open spaces, parks, and trails as otherwise required by the City.

PW / PL Ongoing AF
Completed and ongoing as part of the
entitlement review process. The City
completed a Mobility Master Plan in
2019.

C.2.3.2
Require and site pedestrian crossings of major roads at key intersections and at locations that provide priority and efficiency to the pedestrian, even at the expense of improved vehicular circulation.

PW / PL 2006 /
Ongoing

AF / CIP/
GF
Completed when project must adhere
to a designated crossing per the Bike
and Pedestrian Master Plan.

C.2.3.3
Ensure safe, efficient pedestrian connections are made between the sidewalk, parking areas, and entrances to stores, offices, and other uses as part of development design review.

PW / PL Ongoing AF / GF
Completed and ongoing as part of the
entitlement review process.

C.2.4.1
Prepare and adopt a Pedestrian Master Plan that sets forth a comprehensive pedestrian system and support facilities, as well as plans education, marketing, and enforcement programs. Identify detailed and ranked improvements in the Master Plan, and update the plan every three to five years. Include minimum sidewalk widths based on development type.

PW / PL 2006 /
2007 GF
Completed March 2011. Update
completed in 2019.

C.2.4.2 Coordinate the Pedestrian Master Plan and the circulation-related components of the City Open Space Standards.

PW / PL /
CRPD
2006 /
2007 GF Completed November 2013.

Page 179 of 1447 ends

ITEM 9.7. ATTACHMENT 2
22 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
C.2.5.1
Prepare and adopt a Bikeway Master Plan that sets forth a comprehensive bicycle system and support facilities over the next 20 years, as well as plans education, marketing, and enforcement programs. Identify detailed and ranked circulation improvements in the Master Plan, and update the plan every three to five years.

PW /
PL
2006 /
2007 GF
Completed March 2011.

C.2.5.2 Coordinate the Bikeway Master Plan with the circulation-related components of the City Open Space Standards.

PW /
PL
2006 /
2007 GF Completed November 2013
C.2.5.3
Pursue all available sources of funding for the development and improvement of bicycle facilities. Develop projects and secure funding to improve pedestrian and bicycle safety and access around schools and transit stations.

PW Ongoing CIP /
Grants
On-going. Obtained grants for
alternate modes.

C.2.5.4
Establish a Bicycle Advisory Committee to oversee creation and implementation of the Bicycle Master Plan and ensure consistency with existing policy documents, such as the General Plan.

PW 2006 GF
The Bicycling Advocates for Rancho
Cordova has been established. Staff
attends meetings
C.2.5.5
Coordinate City departments with stakeholders such as the County of Sacramento, Sacramento Area Council of Governments, Bureau of Reclamation, American River Parkway Committee, Cordova Recreation and Park District, Sacramento City / County Bicycle Advisory Committee, air quality agencies, Sacramento Regional Transit District, 50 Corridor Transportation Management Association, employers, residents, and cyclists in order to design, implement, and maintain the proposed bikeway system.

PW Ongoing GF
Staff is working with all agencies to
build an integrated trail system. In
2021 SACOG to include the City of
Rancho Cordova and other cities
worked on the Draft Regional Trails
Network Plan.

C.2.5.6 Provide staff resources focused on review of proposed bicycle and related facilities and their implementation and operation. PW / PL 2006 / 2007 GF Completed.

C.2.7.1 Include grade-separated crossings in the City’s Capital Improvement Plan, and collect fees to assist in the construction of these facilities. PW 2006 CIP / GF Grade Separations for Bikes and Peds are included in the Fee Program.

C.2.7.2
Develop standards for grade separated pedestrian and bicycle crossings that take the pedestrian / bicycle crossing either above or below the road.

When the crossing goes under the road, development standards should specify that a change is elevation is required of both the crossing and roadway, thereby splitting the necessary vertical clearance. Doing so will make the crossing safer and more attractive to users by allowing them to see the horizon as they make the crossing.

PW 2006 /
2007 CIP
Developed a standard for bicycle
under-crossings and continue to
expand standard options. Zinfandel
Drive Bicycle Crossing is under
design.

C.2.7.3
Identify grade separated crossings and enhanced intersection improvements for bikeways and trails as part of the Bicycle Master Plan, Trails Master Plan, Pedestrian Master Plan, and in conjunction with development review.

PW / PL 2006 /
2007 GF
Completed as part of the Bike and
Pedestrian Master Plan in 2011 and
2013.

C.2.8.1
Develop programs to encourage bicycle use in communities where significant segments of the population do not drive and where short trips are most common (e.g., through Safe Routes to Schools programs).

PW Ongoing GF / Grants
Working with 50 Corridor TMA and
advocacy groups to expand City
programs.

Page 180 of 1447 ends

ITEM 9.7. ATTACHMENT 2
23 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
C.2.8.2
Maintain roadways and bicycle-related facilities so they provide safe and comfortable conditions for the bike rider, including establishing a routine street sweeping program and maintaining lane striping for bike lanes and routes.

PW Ongoing CIP
Street sweeping maintenance
programs in place.

C.2.8.3 Minimize road construction impacts by coordinating bike, and pedestrian facilities with roadway construction whenever feasible. PW Ongoing CIP Included in project delivery requirements.

C.2.8.4
Ensure traffic-calming projects are appropriate for bicycle and pedestrian users (e.g., address bulb-out or roundabout designs that push cyclists into traffic).

PW Ongoing GF / Grants
Bike Ped access is a key element in
the NTMP
C.2.8.5 Provide signage, alternative routes, etc. during construction activities affecting bikeways to ensure the safety of cyclists. PW Ongoing CIP Included in Construction Standards C.2.8.6
Enforce traffic laws to improve the safety and comfort of all road users, with a particular focus on behaviors and attitudes that cause motor vehicle / bicycle crashes.

PD Ongoing GF
Ongoing.

C.2.8.7
Use available accident data to monitor bicycle-related accident levels annually and focus on a reduction of fifty percent on a per capita basis over the next 20 years.

PD Annual GF
Ongoing.

C.2.8.8 Improve pedestrian crossings in areas of high pedestrian activity where safety is an issue. PW Ongoing CIP Addressed in the Bicycle and Pedestrian Master Plans.

C.2.8.9
Adopt a target level of bicycle use (e.g. percent of trips) and safety to be achieved within a specific timeframe, and improve data collection necessary to monitor progress.

PW / PD Ongoing GF
Mode split goals are established in the
Bicycle Master Plan
C.2.8.1
0 Identify a funding source that will provide at least one crossing guard for each elementary and middle school in the City. Work with school districts to identify joint funding solutions and other partnership opportunities that facilitate pedestrian safety around schools
PD / PW Ongoing GF / Grants
Not Completed
C.2.10.
1 As part of the Pedestrian Master Plan, Bicycle Master Plan, and/or City Street Standards, develop improvement standards for at-grade pedestrian crossings (e.g., pedestrian bulb outs, markings, special paving, lighting, signage) with performance standards for location and frequency.

PW 2006 /
2007 GF
These standards are included in the
NTMP and the BMP and PMP.

C.3.1.1
Create, implement, and update regularly a Transit Master Plan for Rancho Cordova that identifies the type of system desired for the City. Transit routes should coincide with major destinations for employment and shopping, the location of major institutions, concentrations of multi-family housing, and other land uses likely to attract public transit ridership. Bus routes should follow major roads with service to residential neighborhoods from connector streets. Figure C-3 identifies the City’s preferred transit system.

PW / PL 2006 GF
The Mobility Master Plan was updated
in 2019.

C.3.1.2 Work with transit providers to develop and implement the Transit Master Plan and any additional transit services within the City that are timely, PW Ongoing GF / IF / UF / Grants
Initiated with the Rancho CordoVan
and is continuing. Olie program
complete.

Page 181 of 1447 ends

ITEM 9.7. ATTACHMENT 2
24 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
cost-effective, and responsive to growth patterns and existing and future transit demand.

C.3.1.3 Pursue all available sources of funding for transit services. PW Ongoing GF Obtained a demonstration grant C.3.1.4
Ensure that transit service is provided in accordance with regional plans and policies, including identified transit improvements developed as part of the Sacramento County Mobility Study.

PW Ongoing GF / Grants
Transit planning is integrated with other
transit agencies.

C.3.1.5
Review the need for additional transit lines / service in new development and require installation of needed stops through the project review process.

PW Ongoing AF / GF
Performed as part of the City’s transit
implementation efforts.

C.3.2.1
Encourage paratransit service within the City by working with service providers to better identify service gaps and resources, and to improve response times.

PW Ongoing GF
The Paratransit service area was
expanded and will continue to look for
expansion opportunities.

C.3.3.1
Require new development and redevelopment to include public transit stations, especially light rail stations, and to promote pedestrian activity and connection between public transit and retail, office, and residential uses.

PW / PL Ongoing AF
The City currently has 4 light rail
stations. New development is required
to provide their fair share of transit
improvements (i.e. additional ROW,
funding) as part of the entitlement
review process.

C.3.3.2
Consistent with the Transit section of the Circulation Plan and the Transit Master Plan, require development to dedicate the necessary right-of-way needed to accommodate planned transit services.

PW Ongoing AF
Right-of-way needs are verified in the
improvement plan process.

C.3.4.1
Encourage and accept employee shuttles as a viable mitigation measure for trip reduction when proposed development cannot otherwise mitigate potential impacts to City streets.

PW / PL Ongoing AF / GF / IF
Efforts are being addressed by the 50
TMA.

C.4.1.1
Work with the Sacramento County Airport System and the Airport Land Use Commission to improve operations at Mather Airport, consistent with the City’s vision.

ED / PL Ongoing GF
The Airport Land Use Plan is in the
draft stage.

C.5.3.1
Periodically undertake a detailed analysis of the improvements needed as growth occurs and the costs associated with those improvements. Update fees as necessary to ensure full funding of all required improvements.

PW Ongoing GF
The Transportation Impact Fee
program was reviewed in 2019.

C.5.3.2
Establish a road maintenance assessment district to provide a funding source to maintain road improvements and new roads as a result of new development.

PW 2006 GF
Maintenance Districts have been
established.

C.6.1.1
Develop and implement a comprehensive system to monitor and evaluate the conditions and maintenance needs of the existing transportation network. Inventory and categorize the City-maintained roads by road type and condition using a pavement management system.

PW Ongoing GF / CIP
The City has established a Pavement
Management System using a
pavement condition index. Updated in
2021.

C.6.1.2
Work with SACOG to ensure that the Metropolitan Transportation Plan is coordinated with the City’s Capital Improvement Plan to facilitate access to federal and state funds for circulation maintenance and improvements.

PW Ongoing GF
City staff has an in-depth coordination
process for SACOG MTP updates.

Page 182 of 1447 ends

ITEM 9.7. ATTACHMENT 2
25 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
V I I – O P E N S P A C E , P A R K S , A N D T R A I L S E L E M E N T OSPT.

1.1.1 Require developers of all new residential development to dedicate parkland at a rate of five acres of land per 1,000 population. When necessary, provide an in-lieu payment option, which allows the developer to fund the acquisition of acceptable land equal to the dedication requirement. Calculate required parkland dedication exclusive of required open space.

PL / CRPD Ongoing AF
Completed and ongoing as the City
now has open space requirements.

OSPT.

1.1.2 Consult with the Cordova Recreation and Park District prior to determining the acceptability of lands proposed for dedication as public parkland. PL Ongoing GF /AF Completed and ongoing.

OSPT.

1.1.3 Establish a procedure for determining an appropriate in lieu fee amount that ensures CRPD will have adequate funds to purchase required parkland for which in lieu fees are paid.

PL / F /
CRPD 2006 GF
Completed. Outlined within
Development Agreements and required
in lieu fees prior to Final Map Approval
OSPT.

1.4.1 Ensure that sufficient funding for maintenance of parks is assured prior to approval of any Final Subdivision Map that includes public parks and / or related facilities.

PL / F /
CRPD Ongoing GF
Completed and ongoing. This is
enforced through the existing and
proposed Development Agreements.

OSPT.

1.4.2 Consider creating a fee and assessment program to provide increased funding for existing parks, in collaboration with the Cordova Recreation and Park District. This could include local or regional bond measures or assessment districts, public or private grants or partnerships, homeowners associations, or other methods deemed appropriate by the City.

PL / F /
CRPD Ongoing GF
Ongoing.

OSPT.

1.5.1 Continue to work with the Cordova Recreation and Park District on this issue, and implement funding mechanisms as part of the City’s review and approval of new development projects.

PL / CRPD Ongoing GF
Ongoing.

OSPT.

1.5.2 Explore the possibility of the Cordova Recreation and Park District constructing a community pool that is usable year-round. PL / CRPD 2007 GP / PF The Cordova Community pool was completed and opened in June 2021.

OSPT.

1.5.3 Expand the Cordova Senior Center at the Lincoln Village Community Park, and the construction of new senior community facilities as demand for such facilities increases.

PL / CRPD 2007 /
2008 GP / PF
Improvements have been made.

OSPT.

1.6.1 Continue to work with the Cordova Recreation and Park District in the planning and execution of park and recreation facilities to accommodate a variety of regional sports venues.

PL Ongoing GF
Complete and ongoing.

OSPT.

1.6.2 Work cooperatively with the Sacramento Sports Commission and Chamber of Commerce Visitor and Tourist Bureau to attract and host regional sporting activities.

PL / CRPD Ongoing GF
Complete and ongoing.

OSPT.

2.1.1 Adopt City Open Space Standards as an action program to implement the open space policy framework in this Element. The standards will clearly define the City’s requirements for the improvement, expansion, and maintenance of open space. Such standards shall include provisions for PL 2006 GF
Complete.

Page 183 of 1447 ends

ITEM 9.7. ATTACHMENT 2
26 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
two types of open space: 1) Mandatory Open Space, and 2) Performance Based Open Space.

OSPT.

2.1.2 -Require developers of all new residential development to dedicate parkland at a rate of 1.75 acres of land per 1,000 population, generally comprised of:
- Open Turf, Tree Canopy and Dog Parks;
- Neighborhood Greens; and
- Communitywide Open Space.

PL Ongoing AF
Complete; CRPD regulates the Quimby
parkland requirement while the City
regulates the open space requirement
per the open space standards.

OSPT.

2.1.3 Consider partial credit for mandatory open space within drainage facilities when certain criteria are met. PL Ongoing AF Ongoing.

OSPT.

2.1.4 Exempt from the minimum open space requirements residential subdivisions of ten acres or less which are not part of a master-planned development meeting the minimum open space requirement, at the City’s discretion.

PL Ongoing GF
Under consideration for smaller
projects.

OSPT.

2.1.5 Require all new development projects to provide a system of connected open space that includes greenway, trails, nodes, and green infrastructure (see City Open Space Standards), in proximity to all new residents.

PL Ongoing AF
Complete and ongoing per entitlement
review.

OSPT.

2.1.6 Ensure that funding for maintenance of open space is sufficient prior to approval of any Final Subdivision Map of development that includes open space facilities or amenities.

PL / F Ongoing AF
Ongoing.

OSPT.

2.1.7 Consider including encumbered land (such as a power line easement) that meets all other requirements for open space for inclusion in the open space system on a case-by-case basis.

PL Ongoing AF
In 2021, The Ranch project is under
construction that includes power
line easements, trails, and open
space. The trail system will link with
existing trails.

The Preserve Project- a 277-acre site
proposed for single-family
development sets aside 66% of the
property as an open space preserve.

The community also includes a trail
system connecting the
neighborhood to the park system
which borders Morrison Creek.

OSPT.

2.2.1 Adopt a comprehensive Open Space Preservation Plan as the action program that clearly implements the City’s open space policy framework and provides clear direction for the maintenance of open space lands.

PL / CRPD 2006 /
2007 GF
Completed. Open Space Design
Guidelines.

OSPT.

2.3.1 Encourage projects to accomplish the following:
- Align roads and public spaces to take advantage of vistas over mitigation lands;

PL / PW /
CRPD Ongoing AF
Complete and ongoing. The Ranch
project incorporates preserve area with
trails along the preserve.

The Preserve Project- a 277-acre site
proposed for single-family

Page 184 of 1447 ends

ITEM 9.7. ATTACHMENT 2
27 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
- Site publicly accessible trails adjacent to the boundaries of mitigation lands to take advantage of the open character and uninterrupted edge of the mitigation lands; and
- Consider locating public parks adjacent to mitigation lands to create a greater sense of open space and to take advantage of opportunities for vistas and trail connections.
development sets aside 66% of the
property as an open space preserve.

The community also includes a trail
system connecting the
neighborhood to the park system
which borders Morrison Creek.

OSPT.

2.3.2 Through the development review process, incorporate design features that increase visual access to natural resource mitigation lands. PL Ongoing AF Complete and ongoing.

OSPT.

3.1.1 Create and adopt a comprehensive Trails Master Plan that includes information on current resources and plans for future development, including designating locations and types of trails.

PL / PW 2006 /
2007 GF
Completed in 2016.

Bicycle Trails Master Plan. 2021:

Zinfandel overpass crossing is in
Design.

OSPT.

3.1.2 Review all new development projects and public works projects and require compliance with the Trails Master Plan prior to approval. PL / PW Ongoing GF Completed during entitlement review.

OSPT.

3.1.3 Provide appropriate pedestrian and bicycle linkages to existing facilities, particularly to those facilities within the American River Parkway and the Folsom South Canal.

PL / PW Ongoing GF / AF
On-going.

OSPT.

31.4 Develop and implement a capital improvement plan to construct new bridges, grade-separated crossings, and ramps at key intersections of major trails and roadways.

PW Ongoing GF
Grade separated crossings are
included in the BMP and in the Fee
Program.

OSPT.

3.2.1 Work cooperatively with Sacramento County to fund enhancements within the American River Parkway, consistent with the American River Parkway Plan.

PL / PW /
CRPD Ongoing GF / Grants
On-going. 2021: Trail Enhancement
is in Design
OSPT.

3.3.1 Include funding for grade-separated and enhanced at-grade pedestrian crossings through the development review and entitlement process and pursue grants and other funding for trails.

PL / PW Ongoing AF
Infrastructure needs are included in
development efforts.

OSPT.

4.1.1 Provide staff support and / or funding to facilitate updates to the American River Parkway Plan.

PL / PW /
CRPD Ongoing GF Ongoing.

OSPT.

4.1.2 Identify and support programs, which serve the special recreational and open space needs of seniors, youth, and other special needs groups that may be underserved within the community.

PL / CRPD Ongoing GF / Grants
Ongoing.

OSPT

4.1.3 Identify and support programs which serve the special recreational and open space needs of seniors, youth, and other special needs groups that may be underserved within the community.

PL / CRPD Ongoing GF / Grants
Ongoing; Multiple departments have
been included to facilitate this outreach.

OSPT

4.1.4 Determine the need for special facilities for seniors (e.g., more benches and flat paved walking areas near the river). PL / CRPD Ongoing GF / Grants Ongoing and part of the building permit and improvement plan review.

OSPT

4.1.5 Determine the need for special facilities for youths consistent with natural resource protection. PL / CRPD Ongoing GF / Grants Ongoing.

Page 185 of 1447 ends

ITEM 9.7. ATTACHMENT 2
28 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
OSPT.

4.2.1 Encourage the use of volunteers and community groups to provide maintenance and safety patrols on trails through the provision of funding and staff assistance to leverage volunteer efforts.

PL / PW /
CRPD / PD Ongoing GF / Grants
Ongoing. City engages in events such
as Creek Week and Community Clean
Up events to help maintain Open
Space areas.

OSPT.

4.2.2 Promote the City’s world-class system of parks, trails, and open space to all users through education, marketing, and community activities.

PL / PW /
CRPD / PIO Ongoing GF / Grants
Working to improve prominence of the
American River Parkway. The City of
Rancho Cordova Website was
updated in 2021.

OSPT.

4.2.3 Support trails events and trail use through publicity, proclamations, participation, and funding, community events (e.g., Fourth of July Celebration, Kid’s Day, Soil Born Farms, Anatolia-Kavala Rancho Trail) that cross community and neighborhood boundaries, and help bring together various segments of the population.

PL / PW /
CRPD / PIO Ongoing GF / Grants
These events are promoted and
supported in our city bicycle program.

The City of Rancho Cordova Website
was updated in 2021.

V I I I – I N F R A S T R U C T U R E A N D F I N A N C E E L E M E N T ISF.1.1
.1
Utilize the City’s Fiscal Impact of New Development (FIND) Model within the review of proposed development projects to ensure revenues associated with the project will fully fund City expenses associated with the project.

PL / F Ongoing AF
Not Completed.

ISF.1.1
.2
Annually review the Fiscal Impact of New Development (FIND) Model and update as needed to reflect actual costs of City Services. PL / F Annual GF Not Completed.

ISF.1.1
.3
Periodically evaluate the City’s office and retail demand based on changing demographics and market conditions to ensure an adequate supply of land for non-residential use.

PL / ED / RA Ongoing GF / RDA
Included in 2016 Strategic Plan Update
and Economic Development Strategic
Plan
ISF.2.1
.1
Except when prohibited by state law, require sufficient capacity in all public facilities to maintain desired service levels and avoid capacity shortages, traffic congestion, or other negative effects on safety and quality of life.

PL / PW Ongoing AF
Ongoing.

ISF.2.1
.2
Adopt a phasing plan for the development of public facilities in a logical manner that encourages the orderly development of roadways, water and sewer, and other public facilities.

PW 2007 GF / AF
Ongoing
ISF.2.1
.3
Withhold public financing or assistance from projects that do not comply with the planned phasing of public facilities, and approve interim facilities only in special circumstances.

PW / ED / RA Ongoing AF
Ongoing
ISF.2.1
.4
Work with utility providers to coordinate the installation or upgrading or relocation of utilities to minimize multiple trenching of city streets. PW Ongoing AF Ongoing.

ISF.2.2
.1
Establish a Technical Review Committee for continued coordination with outside service agencies, including water and sewer providers, the Cordova Recreation and Park District, and the school districts, during the review of plans and development projects.

PL / PW / B 2006 /
Ongoing GF / AF
Ongoing as the Development Service
Team (DST) fills this role in preapplication and application review.

Page 186 of 1447 ends

ITEM 9.7. ATTACHMENT 2
29 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
Meetings take place weekly on
Thursdays at 10am.

ISF.2.3
.1
Require secure financing for all components of the transportation system through the use of special taxes, assessment districts, developer dedications, or other appropriate mechanisms. Financing should be sufficient to complete required major public facilities at their full planned capacities in a single phase. Major facilities include roadways of collector size or larger; all wells, water transmission lines, treatment facilities, and storage tanks needed to serve the project; and all sewer trunk and interceptor lines and treatment plants or treatment plant capacity. - Design, engineering, environmental compliance, and construction of roadway lanes, traffic signals, and bridges.
- Right of way acquisition, design, engineering, environmental compliance, and construction costs.
- Drainage and other facilities related to new roadway construction. - Installation of landscaped medians, sidewalks, and streetscaping where appropriate.

PW / F Ongoing GF / AF / IF
Ongoing for new development
projects.

ISF.2.3
.2
Require new development to fund its fair share portion of its impacts to all public infrastructure and facilities.

PL / PW / B /
F
Ongoing AF Ongoing.

ISF.2.3
.3
Include sufficient funding in fee programs and / or other finance mechanisms to cover the costs of each of the following roadway items: PW / F Ongoing GF / AF Ongoing ISF.2.4
.1
The following shall be required for all legislative-level development projects, including community plans, general plan amendments, specific plans, rezonings, and other plan-level discretionary entitlements, but excluding tentative subdivisions maps, parcel maps, use permits, and other project-specific discretionary land-use entitlements or approvals:
- Proposed water supplies and delivery systems shall be identified at the time of development project approval to the satisfaction of the City.

The water agency or company proposing to provide service (collectively referred to as “water provider”) to the project may provide several alternative methods of supply and/or delivery, provided that each is capable individually of providing water to the project. The project applicant or water provider shall make a factual showing prior to project approval that the water provider or providers proposing to serve the development project has or have legal entitlements to the identified water supplies or that such entitlements are reasonably foreseeable by the time of subsequent, project-specific discretionary land-use entitlements or approvals. This factual showing shall also demonstrate that the water provider’s identified water supply is reasonably reliable over the long term (at least 20 years) under normal, single-dry and multiple-dry years.
- All required water treatment and delivery infrastructure for the project shall be in place at the time of subsequent, project-specific PW / PL Ongoing AF
Ongoing per the entitlement review
process through Conditions of
Approval, Water Agency Review, and
Improvement Plan Review.

Page 187 of 1447 ends

ITEM 9.7. ATTACHMENT 2
30 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
discretionary land-use entitlements or approvals. Or shall be assured prior to occupancy through the use of bonds or other sureties to the City’s satisfaction. Water infrastructure may be phased to coincide with the phased development of large-scale projects.
· Action service area, and other projects, which have received commitments for, water service.
- Offsite and onsite water infrastructure sufficient to provide adequate water to the subdivision shall be in place prior to the approval of the Final Map or their financing shall be assured to the satisfaction of the City, consistent with the requirements of the Subdivision Map Act. - Offsite and onsite water distribution systems required to serve the subdivision shall be in place and contain water at sufficient quantity and pressure prior to the issuance of any building permits. Model homes may be exempted from this policy as determined appropriate by the City, and subject to approval by the City.

ISF.2.4
.2
The following shall be required for project-specific discretionary land-use entitlements and approvals, including but not limited to, all tentative subdivision maps, parcel maps, or use permits:
- An assured water supply and delivery system shall be available or reasonably foreseeable at the time of project approval. The water agency providing service to the project may provide several alternative methods of supply and/or delivery, provided that each is capable individually of providing water to the project.
- The project applicant, water agency (or agencies), or water company (or companies) providing water service to the project site shall make a factual showing consistent with, or the City shall impose conditions similar to, those required by Government Code section 66473.7 in order to ensure an adequate water supply for development authorized by the project. Prior to recordation of any final subdivision map, or prior to City approval of any similar project-specific discretionary land use approval or entitlement required for nonresidential uses, the project applicant or water provider shall demonstrate the availability of a longterm, reliable water supply for the amount of development that would be authorized by the final subdivision map or project-specific discretionary non-residential approval or entitlement. This assurance of water supply shall identify that the water provider has legal entitlement to the water source and that the water source is reasonably reliable (at least 20 years) under normal, dry and multiple dry years. Such demonstration shall consist of a written certification from the water provider that either existing sources are available or that needed improvements will be in place prior to occupancy.
- Offsite and onsite water infrastructure sufficient to provide adequate water to the subdivision shall be in place prior to the issuance of building permits or their financing shall be assured to the satisfaction of PW / PL Ongoing AF
Complete and ongoing per the
entitlement review process,
Conditions of Approval, Water
Agency Review and
Improvement Plans,

Page 188 of 1447 ends

ITEM 9.7. ATTACHMENT 2
31 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
the City prior to the approval of the Final Map, consistent with the requirements of the Subdivision Map Act, or prior to the issuance of a similar, project-level entitlement for non-residential land uses. - Offsite and onsite water distribution systems required to serve the subdivision shall be in place and contain water at sufficient quantity and pressure prior to the issuance of any building permits. Model homes may be exempted from this policy as determined appropriate by the City, and subject to approval by the City.

ISF.2.6
.1
Require all subdivision developments to adhere to the following provisions, to the extent permitted by state law:
- Sewage / wastewater treatment capacity shall be available at the time of tentative map approval.
- The agency providing sewer service to the subdivision shall demonstrate prior to the approval of the Final Map by the City that sufficient capacity shall be available to accommodate the subdivision plus existing development, and other proposed or approved projects which have received sewage treatment capacity commitment. - Onsite and offsite sewage conveyance systems required to serve the subdivision shall be in place prior to the approval of the Final Map, or their financing shall be assured to the satisfaction of the City, consistent with the requirements of the Subdivision Map Act.
- Sewage conveyance systems within the subdivision shall be in place and connected to the sewage disposal system prior to the issuance of any building permits. Model homes may be exempted from this policy as determined appropriate by the City, and subject to approval by the City.

PW / PL Ongoing AF
Complete and ongoing per the
entitlement review process, Conditions
of Approval, Improvement Plans, and
Sacramento Area Sewer District
Review.

ISF.2.6
.2
Generally, the City shall not allow construction of independent community sewer systems to serve new development. PL / PW Ongoing AF Ongoing per the entitlement review process.

ISF.2.6
.3
Require all commercial or industrial development, as well as all residential development with lots smaller than two acres, to connect to a public sewer system.

PL / PW Ongoing AF
Ongoing per the entitlement review
process.

ISF.2.7
.1
Coordinate with utility agencies to underground, strategically place, and screen equipment to the maximum extent feasible. PL / PW Ongoing AF Ongoing per the entitlement review process.

ISF

2.7.2 Require complete visual screening of all utility sites, facilities, and equipment, with special emphasis on screening in proximity to residential property or in view shed.

PL Ongoing AF
Ongoing as a zoning code requirement
section 23.731.080.

ISF.2.8
.1
Develop an Information Technology Strategic Plan with input from community stakeholders and experts. F
2006 /
2007 GF Completed and Ongoing.

ISF.2.8
.2 Explore ways to improve the City’s website to provide service in new ways. CM 2006 and ongoing GF Ongoing development

Page 189 of 1447 ends

ITEM 9.7. ATTACHMENT 2
32 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
ISF.3.1
.1
City Staff shall actively work with other agencies and jurisdictions in the development / expansion and funding of a wide range of public services including, but not limited to neighborhood services, social and cultural services, special needs services, housing services, educational and community services, and recreational services.

PL / ED / H /
CRPD Ongoing GF / Grants
Ongoing – as needed
ISF.3.1
.2
Regularly survey or otherwise identify the service needs and priorities of Rancho Cordova residents. CM / H Ongoing GF Ongoing.

ISF.3.1
.3
Pursue grants and other funding opportunities to create new services or expand existing services targeted to meet the needs of Rancho Cordova residents and employees.

CM / PL / PW
/ B / ED / H Ongoing GF
Ongoing.

ISF.3.1
.4
Encourage the co-location of public service providers into commercial, office, and mixed-use sites that are accessible to persons in need of services.

PL / ED / RA Ongoing GF
Ongoing – as needed
ISF.3.2
.1
Provide financial support to the existing library system to improve services for local residents and employees (e.g., extended hours). CM / F Ongoing GF / Grants Not Completed. CF fees are currently collected for new facilities.

ISF.3.2
.2
Encourage the County to locate new libraries within Rancho Cordova accessible to pedestrians, bicycles, and public transit riders, in a highly visible location that is accessible to unaccompanied children.

CM / PL / PW
/ ED Ongoing GF / Grants
Ongoing
ISF.3.2
.3
Consider the establishment of a fee for public library financing based on projected employment for new non-residential development. CM / F 2006 / 2007 GF Not Completed.

ISF.3.2
.1
Market the City’s strengths and desires for development of a full-service hospital to national hospitals and medical service providers. CM / ED / PL 2006 / Ongoing GF Ongoing.

ISF.3.2
.2
Consider the creation of economic development or redevelopment incentives to encourage the development of a full service hospital in Rancho Cordova (e.g., assembly and / or dedication of land, reduction of fees).

ED 2006 /
2007 GF
Ongoing discussion
ISF.3.4
.1
Create an organization of community volunteers at City hall by contacting local volunteer groups, coordinating activities, and facilitating the sharing of information and resources.

NS / H / PIO 2006 /
Ongoing GF
Complete and ongoing. The City of
Rancho Cordova Website was
updated in 2021.

ISF.3.4
.2
Create local neighborhood advisory committees and empower leaders to enhance their community. NS / H / PL 2006 / Ongoing GF
Complete and ongoing for events in
2021 (e.g. ITLV). Although revised to
meet CDC guidelines
ISF.3.4
.3
Create a neighborhood services education program to increase awareness about City standards and property maintenance. NS 2007 / Ongoing GF Complete and Ongoing (e.g. Blight
Busters, Mayor’s Walk). However, the
year 2021 did not allow several in
person events.

ISF.4.1
.1
Convene a focused design effort with the School Districts to establish design guidelines for schools. Key issues include:
- Proper sizing of school campuses and consideration of urban school design.

PL / School
Districts /
CRPD
2006 /
2007 GF
Ongoing.

Page 190 of 1447 ends

ITEM 9.7. ATTACHMENT 2
33 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
- Design solutions that enhance; rather than impact neighborhoods. - Address shared use of school facilities, including continued park/school combined facilities and community use of school campus libraries.

ISF.4.1
.2
Support the Folsom Cordova and Elk Grove Unified School Districts in siting new school facilities according to the following criteria:
- Schools should be within walking distance of most residences, and should connect with trails, bikeways, and pedestrian paths. - Schools should serve as a focal point of neighborhood activity and be interconnected with churches, parks, greenways, and off-street paths whenever possible.
- New schools should be placed adjacent to neighborhood and community parks whenever possible and be designed to promote joint use of appropriate facilities.

PL / School
Districts Ongoing AF / GF
Ongoing as part of the entitlement
review process.

ISF.4.1
.3
Conduct focused discussion with local school districts to discuss design of pedestrian and bicycle facilities adjacent to and within the school sites CM 2006 /
2007 /
Ongoing
GF
Completed and ongoing.

ISF.4.2
.1
Continue to pursue a single unified school district for the City’s K-12 children. CM
2006 /
2007 /
Ongoing
GF
Not complete.

ISF.4.3
.1
Create economic development and / or redevelopment incentives for the location and development of educational institutions in proximity to light rail and / or visible from Highway 50.

PL / ED / RA 2006 /
2007 GF
New educational facilities have been
located in proximity to light and
highway 50 (e.g. Folsom Lake
College). Phase 2 will begin.

ISF.4.3
.2
Require Community Plans, Specific Plans, and Special Planning Areas to consider the needs of community colleges and address the feasibility and appropriateness of off-campus facilities, particularly in town centers and transit-oriented developments.

PL / ED / RA Ongoing AF
All aspects of a project are taken into
consideration during entitlement
review.

I X – N A T U R A L R E S O U R C E S E L E M E N T
NR.1.1.
1 Incorporate large habitat preserves and interconnected wildlife corridors in new development areas to provide ample space for animal movement. PL Ongoing AF / GF Ongoing as part of the entitlement
review process and CEQA Analysis.

The Ranch project includes a large
habitat preserve area.

NR.1.1.
2 Review projects through the entitlement process and CEQA analysis to ensure that they comply with this policy if the site contains unique habitat, creeks and / or wooded corridors.

PL Ongoing AF
Ongoing.

NR.1.1.
3 As part of the consideration of development applications for individual Planning Areas containing habitats that support special-status plant and animal species that are planned to be preserved, the City shall require that these preserved habitats have interconnections with other habitat areas in PL Ongoing AF
Ongoing. The Habitat Conservation
Plan was approved in 2019. The City
coordinates with the South Sacramento
Habitat Conservation Plan Technical

Page 191 of 1447 ends

ITEM 9.7. ATTACHMENT 2
34 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
order to maintain the viability of the preserved habitat to support the special-status species identified. The determination of the design and size of the “interconnections” shall be made by the City, as recommended by a qualified professional, and will include consultation with the California Department of Fish and Game and U.S. Fish and Wildlife Service.

Advisory Committee on projects within
the SSHCP area.

NR.1.1.
4 Prior to the approval of any public or private development project in areas containing trees, the City shall require that a determinate survey be conducted during the nesting season (March 1 and August 31) to identify if active nesting by birds protected under the Migratory Bird Treaty Act (MBTA) is taking place. If all site disturbance is to occur outside this time, the actions described in this mitigation measure are not required. If nesting activity is observed, consultation with the City of Rancho Cordova Planning Department shall be conducted in order to determine the appropriate mitigation, if any, required to minimize impacts to nesting birds. No activity may occur within 100 feet of any nesting activity or as otherwise required following consultation with the California Department of Fish and Game.

PL Ongoing AF
Ongoing.

NR.1.2.
1 Establish a Swainson’s Hawk Ordinance in coordination with the California Department of Fish and Wildlife to establish the process of mitigating for the loss of Swainson’s hawk foraging habitat based on habitat value lost to development. The ordinance will set forth a process where habitat lost to development will be mitigated through the permanent protection of equivalent or better existing habitat conditions (referred to hereafter as “mitigation lands”). The specific required mitigation ratios (habitat acreage lost versus mitigation lands) and any other provisions to mitigation process shall be established through technical studies as part of the development of the ordinance and will take into account value of habitat to be converted in relation to habitat value of the mitigation lands (e.g., relation to nesting sites), proximity of the mitigation lands to adjacent conditions affecting habitat (e.g., nearby land uses and already permanently protected lands), and other relevant factors. The ordinance will also establish standards ensuring that mitigation land will be adequately protected and managed in perpetuity (e.g., via conservation easement, deed restriction or other appropriate method), and setting forth the timing of the required provision of mitigation lands in relation with the timing of the loss of habitat in the City (as its boundaries may be changed through subsequent annexations), such that mitigation lands shall be provided no later than prior to ground disturbance.

PL 2006 /
2007 GF
Completed.

NR.1.3.
1 Coordinate with non-profit groups, educational institutions, and other agencies to provide environmental education programs that inform the public about the City’s natural resources, existing preserve sites, and cohabitation with common urban wildlife populations.

PIO / PL Ongoing GF
Completed and ongoing. This included
information on stormwater and impacts
to sensitive habitats/species (e.g.

Creek Week) The City of Rancho
Cordova Website was updated in
2021.

Page 192 of 1447 ends

ITEM 9.7. ATTACHMENT 2
35 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
NR.1.4.
1 Create an educational leaflet that identifies common invasive species and recommends the planting of non-invasive species. PIO 2006 / 2007 GF Not Complete.

NR.1.4.
2 The City shall adopt and maintain a Noxious Weed Ordinance. The Noxious Weed Ordinance shall include regulatory standards for construction activities that occur adjacent to natural areas to inhibit the establishment of noxious weeds through accidental seed import.

NS 2006 /
2007 GF
Complete per 17.12.

NR.1.7.
1 For those areas in which special status species are found or likely to occur or where the presence of species can be reasonably inferred, the City shall require mitigation of impacts to those species that ensure that the project does not contribute to the decline of the affected species populations in the region to the extent that their decline would impact the viability of the regional population. Mitigation shall be designed by the City in coordination with the U.S. Fish and Wildlife Service (USFWS) and the California Department of Fish and Game (CDFG), and shall emphasize a multi-species approach to the maximum extent feasible. This may include development or participation in a habitat conservation plan.

PL Ongoing AF
Ongoing.

NR.2.1.
1 During the environmental review process, evaluate feasible on-site alternatives that will reduce impacts to wetland resources and effectively preserve these resources.

PL Ongoing AF
Ongoing.

NR.2.4.
1 Develop trails and associated educational facilities (e.g., information kiosks, signage) around wetland and vernal pool preserves where possible while maintaining the integrity of sensitive natural resources.

PL / PIO Ongoing GF / AF
Ongoing with new development. The
City of Rancho Cordova Website
was updated in 2021.

NR.2.4.
2 Consider constructing elevated board walkways and other low impact trails interior to preserves, in coordination with the U.S. Fish and Wildlife Service and U.S. Army Corps of Engineers.

PL Ongoing GF / AF
Ongoing (e.g. Anatolia-Kavala Ranch
Trail)
NR.3.2.
1 Develop guidelines for channel creation or modification that will ensure channel meander, naturalized side slope, and varied channel bottom elevation are considered in design.

PW / PL 2006 /
2007 GF
The Open Space Guidelines provide
guidance for development along the
perimeter of the open space. In
addition, review for water quality
requirements is part of the entitlement
review process..

NR.3.2.
2 Adopt and implement improvement standards for soft bottom channels. PW / PL 2006 / 2007 GF Completed
NR.3.3.
1 Work with affected local, state and federal agencies, including SACOG, the California Department of Water Resources, Delta Keepers and the U.S. Army Corps of Engineers, to determine when natural creek corridors can and should accommodate storm flows or if separate storm water conveyance structures are necessary.

PL / PW
2006 /
2007 /
Ongoing

GF / CF
Part of the Environmental permitting
and Entitlement process.

NR.3.4.
1 Establish performance standards for natural resource preserves that accomplish the following: PL
2006 /
2007 /
Ongoing

GF / CF
The Open Space Guidelines provide
guidance for development along the
perimeter of the open space. In
addition, review for water quality

Page 193 of 1447 ends

ITEM 9.7. ATTACHMENT 2
36 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
- Provide sufficient width for a mowed firebreak (where necessary), adjacent passive recreation uses, and access for channel maintenance and flood control.
- Offer sufficient width in and / or adjacent to preserves to allow for existing and created wildlife habitat, species sensitive to human disturbance, vegetative filtration for water quality, corridor for wildlife habitat linkage, protection from runoff, and other impacts of urban uses adjacent to the corridor.
- Allow for sufficient width adjacent to natural resource preserves to allow for trails and greenbelts.
- Prohibit the placement of water quality treatment structures designed to meet pollutant discharge requirements within mitigation preserves. requirement is part of the entitlement
review process.

NR.3.4.
2 Establish standards that allow public access in the floodplain and buffers along creek corridors and preserves. Mitigation measures shall be incorporated into environmental documents and conditions of approval that require open-view fencing adjacent to preserves.

PL 2006 /
2007 GF / CF
Ongoing. The Ranch project includes
trails adjacent to the preserve area.

The Preserve Project- a 277-acre site
proposed for single-family
development sets aside 66% of the
property as an open space preserve.

NR.3.4.
3 Establish standards and/or guidelines for development adjoining wetland preserves or creeks to maximize visibility by designing the land plan with public streets on at least one side of the corridor or preserve with vertical curbs, gutters, footpath(s), street lighting, and post and cable barriers to prevent unauthorized vehicular entry into creek corridors and preserves.

PL 2006 /
2007 GF
Specific guidelines have not been
created; however this is part of the
entitlement review process (e.g. Open
Space Design Guidelines and
screening requirements) and part of the
SSHCP permits for projects within the
SSHCP area.

NR.4.1.
1 Implement the City’s Tree Preservation and Protection Ordinance (and update as necessary) to establish minimum requirements for preserving native trees and landmark trees in the City, including a definition of the size, species, and age requirements of landmark, oak, and other trees to be protected and/or replaced.

PW/PL Ongoing GF
A revised Tree Preservation Ordinance
was adopted in 2017. The revised
ordinance increased the number of
protected trees and includes
restrictions on trimming trees.

NR.4.1.
2 Where feasible, require underground utility lines that are in close proximity to oaks and other landmark trees to be designed and installed to minimize impacts to trees. Work with the utility provider(s) to coordinate transmission line location and other potential impacts associated with the undergrounding of the utilities.

PW / PL Ongoing CF
Ongoing.

NR.4.1.
3 Establish development guidelines that require all oak habitat to be avoided to the maximum extent feasible. When avoidance is not possible, require mitigation efforts that result in preservation of in-kind habitat in the Planning Area.

PL
20067/
2008 /
Ongoing
GF
Ongoing. A City arborist is on staff.

NR.4.2.
1 Create development guidelines to establish minimum planting standards and require appropriate tree species and planting densities within newly landscaped areas that are visible to or shared by the public. An adopted PL 2007 /
2008 GF
Ongoing. Working on standards. Tree
List has been updated and adopted.

Page 194 of 1447 ends

ITEM 9.7. ATTACHMENT 2
37 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
Tree List should be used as a guideline for all tree plantings within the City.

NR.4.2.
2 Create development guidelines that address landscaping standards and that require appropriate tree species and densities in buffer areas. The guidelines should also ensure that medians will include native plantings and trees, and will be wide enough to support the long-term viability of the plantings.

PL 2007 /
2008 GF
Ongoing. A City arborist has been
hired. Working on standards
NR.4.2.
3 Provide leaflets and planting guides that promote the use of droughttolerant native vegetation in home landscaping. PIO / PL 2006 / 2007 GF Not completed.

NR.4.2.
4 Discourage the use of invasive non-native species. PL Ongoing GF Ongoing as part of the entitlement
review process (e.g. required
landscape plans for new
developments).

NR.4.2.
5 Establish a mistletoe abatement and remediation program. NS 2006 / 2007 GF Not Completed.

NR.4.2.
6 Establish guidelines to require planting of trees to reduce “heat island” effects, in order to reduce the need for air conditioning and thus conserve energy.

PL 2007 /
2008 GF
Ongoing. Working on standards.

Tree List has been updated and
adopted.

NR.4.3.
1 Achieve “Tree City USA” status. This will require the City to continue to implement the City’s Tree Preservation and Protection Ordinance (and update as necessary), appoint a board, department or commission to advise the city on tree issues, spend two dollars per capita on community forestry activities, and hold an Arbor Day celebration.

PL/ PW 2007 /
2008 GF
Completed in 2016-2017, City of
Rancho Cordova listed Tree City USA.

NR.4.3.
2 Designate local funds to educate the public on tree planting and preservation. F / PIO Ongoing GF Ongoing. (e.g. program to plan 1 tree a day, City Arbor Day Celebration) NR.4.3.
3 Coordinate with SMUD to offer programs or other resources to provide property owners with information on proper tree selection, proper location to reduce heat transfer effects, planting and maintenance.

PIO / PL Ongoing GF
Ongoing. The City’s Urban Forest
Program in partnership with the
Sacramento Tree Foundation and
SMUD, offers free trees for
residents, businesses and
organizations; free stump removal
for residents; community treeplanting events; and tree advice from the City Arborist.

NR.4.3.
4 Actively participate in the Sacramento County Greenprint Program. PL / PW Ongoing GF On-going NR.5.1.
1 Install water-conserving landscaping and irrigation on City-owned and operated facilities. CM Ongoing GF On-going.

NR.5.1.
2 Require development project approvals to include a finding that all feasible and cost-effective options for conservation and water reuse are incorporated into project design.

PW / PL Ongoing AF
Not Complete. However, new
entitlements are required to comply
with the City’s water conservation

Page 195 of 1447 ends

ITEM 9.7. ATTACHMENT 2
38 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
requirements and the State’s Model
Water Efficient Landscape Ordinances.

NR.5.1.
3 Establish a program that requires per capita water consumption to be reduced by at least 20 percent by 2030 from 2006 baseline conditions consistent with State law. The program shall include the following measures:
- Restrict water usage through metering or establishing designated watering days for the City’s residences and businesses. - Promote water conservation efforts through education. - Implement standards that require low-flow appliances and fixtures in all new development.
- Work with water providers and water conservation agencies to create an incentive program that encourages retrofitting existing development with low-flow water fixtures.
- Require new development and landscaped public areas to utilize stateof-the-art irrigation systems that reduce water consumption (e.g., graywater systems, etc). - Encourage drought-tolerant and native vegetation.

PW / PL 2008 /
2009 GF
Ongoing.

NR.5.1.
4 Require water purveyors to include a provision for water supply monitoring and reporting in the franchise agreements. PW Ongoing GF Ongoing.

NR.5.2.
1 Establish a Large-Scale Recycled Water Program and Citywide Recycled Water Distribution System Ordinance. PW 2006 / 2007 GF Determined not feasible NR.5.2.
2 Coordinate with the City’s water purveyors to establish a connected “purple pipe” system throughout the City’s new development areas that uses recycled water.

PW
2007 /
2008 /
Ongoing
GF
Not Complete. Not feasible.

NR.5.3.
1 Restrict hazardous materials storage in the 100-year floodplain to prevent surface water contamination. PW / PL Ongoing GF
Ongoing Is required by law, addressed
during the project review and
Conditions of Approval phase.

NR.5.3.
2 Educate the community on laws governing the proper handling of hazardous materials, especially those laws which pertain to discharging materials into creeks.

PW / PIO Ongoing GF
Ongoing. Part of the City’s compliance
with the NPDES permit. The City of
Rancho Cordova Website was
updated in 2021.

NR.5.3.
3 Install appropriate signage to deter the discharge of hazardous materials into storm drains. PW Ongoing GF / AF Complete and Ongoing NR.5.3.
4 Future land uses that are anticipated to utilize hazardous materials or waste shall be required to provide adequate containment facilities to ensure that surface water and groundwater resources are protected from accidental releases. This shall include double-containment, levees to contain spills, and monitoring wells for underground storage tanks, as required by local, state and federal standards. Future land uses that include on-site storage of hazardous materials and waste comply with all PW / B Ongoing GF / AF
Public Works has expanded
enforcement and education for the
City’s Storm Water Quality Program.

Building & Safety and Code
Enforcement are assisting with
enforcement.

Page 196 of 1447 ends

ITEM 9.7. ATTACHMENT 2
39 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
applicable local, state and federal regulations, including those regulating the use, storage, handling and disposal of hazardous materials.

NR.5.4.
1 Provide information on pollution prevention, disposal of hazardous waste and chemicals, liability and clean-up on the City’s website and in educational materials and brochures.

PIO / PW Ongoing GF
Ongoing and included on the City’s
website The City of Rancho Cordova
Website was updated in 2021..

NR.5.4.
2 Require clean-up of contaminated ground and surface water by current and / or past owners or polluters. PW / PL Ongoing AF Ongoing.

NR.5.4.
3 Encourage pollutant cleansing companies to use the latest technologies available in order to expedite the cleansing process and do the least harm to the environment.

PW / PL Ongoing AF
Ongoing and included on the City’s
website.

NR.5.5.
1 Require development projects to contain urban runoff control strategies and requirements that are consistent with Master Drainage Plans and the City’s urban runoff management program.

PL / PW Ongoing GF
Ongoing, part of the entitlement review.

Adopted Drainage requirements
NR.5.5.
2 Require development within newly urbanizing areas to incorporate runoff control measures into their site design or to participate in an area-wide runoff control management effort consistent with standards developed by the Public Works Department.

PW / PL Ongoing AF
Ongoing per entitlement review.

Adopted Drainage requirements
NR.5.5.
3 Encourage new development to incorporate features such as grassy swales, multi-use retention or detention basins, and integrated drainage systems to enhance water quality. Work with the Cordova Recreation and Park District to establish standards for integrating retention/detention basins into park sites and create examples of desirable and innovative natural drainage features.

PW / PL Ongoing AF
Ongoing per entitlement review.

NR.5.5.
4 Require the use of best management practices to protect receiving waters from the adverse effects of construction activities, sediment and urban runoff consistent with current state law.

PL / PW Ongoing AF
Ongoing per entitlement review.

NR.6.1.
1 Regulate surface mining operations as required by California's Surface Mining and Reclamation Act of 1975 ("SMARA"), Public Resources Code Section 2207 (relating to annual reporting requirements), and State Mining and Geology Board regulations for surface mining and reclamation practice.

PL Ongoing GF / AF
Ongoing per entitlement review.

NR.6.1.
2 Coordinate mining operations and urban development to minimize conflicts between residents and mining, particularly where mining is required before urbanization.

PL Ongoing AF
Ongoing as part of the specific plan
and master plan review.

NR.6.1.
3 Require inactive mined lands to be reclaimed to a usable condition that is readily adaptable to the future, anticipated land uses. PL Ongoing GF / AF Ongoing.

NR.6.2.
1 Establish and require minimum setbacks of future and reauthorized surface mining from adjoining residential land uses. PL Ongoing GF Ongoing with entitlement and development permit process.

NR.6.2.
2 Prohibit the use of cyanide-leaching systems for gold extraction. B / PW Ongoing GF / AF Ongoing.

Page 197 of 1447 ends

ITEM 9.7. ATTACHMENT 2
40 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
NR.7.1.
1 Develop educational programs to increase energy conservation at the household and business levels. PIO / B / PL 2008 / 2009 GF Building & Safety website directs
developers and property owners to the
State website regarding Energy Code
requirements, and incentive programs
that may help defer costs.

NR.7.1.
2 Develop a comprehensive program to conserve energy resources at Cityoperated facilities. B / PL 2006 / 2007 GF
Ongoing with the Facilities Department.

The City of Rancho Cordova Website
was updated in 2021.

NR.7.3.
1 Offer incentives (e.g., reduced fees, expedited entitlement processing, density bonus) for plans/projects that exceed Title 24 energy efficiency requirements by ten percent.

PW / PL Ongoing GF / AF
Some financial incentives are given for
energy efficiency. However, they not
incentives that would allow the project
to differ cost or deviate from
development standards.

NR.7.4.
1 Consider the following items as ways to implement this policy:
- Fund a program that offers incentives for adding energy efficient systems into existing developments;
- Work with local utility providers to make the public aware of energy rebate programs; and
- Work with community organizations, such as SMUD, to encourage the inclusion of energy efficient systems in remodels and retrofits of existing development.

B / PL / PIO
2008 /
2009 /
Ongoing
GF
Building & Safety website directs
developers and property owners to the
State website regarding Energy Code
requirements, and incentive programs
that may help defer costs.

The City of Rancho Cordova Website
was updated in 2021.

NR.8.1.
1 Continue providing curbside recycling and green waste service to all single-family and duplex residences in Rancho Cordova. CM / PW Ongoing GF / UF Ongoing. Private companies provide
the service with different size
containers. Information is on the City
website
NR.8.1.
2 Create and facilitate a series of educational workshops for the public and businesses on composting and recycling. Provide at least one program to increase recycling by occupants of multi-family housing.

PIO / B / PL /
PW
2007 /
2008 /
Ongoing
GF
Ongoing. The City of Rancho
Cordova Website was updated in
2021..

NR.8.1.
3 Encourage all office, commercial, and multi-family complexes to provide recycling bins and collection service for paper, plastic, glass, and metal. B / PL /PW Ongoing GF Ongoing per the entitlement review. With coordination by Public Works.

NR.8.1.
4 Provide recycling centers at City facilities (e.g., City Hall, libraries) that are available to the public free-of-charge. CM / PW 2006 / 2007 GF Ongoing and included on the City’s website.

NR.8.1.
5 Provide locations for household hazardous wastes to be recycled. B / PW 2006 /
2007 /
Ongoing
GF
Ongoing. Information provided ono the
City’s website.

NR.8.1.
6 Remove impediments to successful recycling. CM / PW 2006 / 2007 GF Ongoing.

NR.8.2.
1 Encourage the school districts within the Planning Area to support recycling at school sites by placing easily accessible recycling bins, providing educational programs on recycling, and using recycled products.

B / PL Ongoing GF
Ongoing.

Page 198 of 1447 ends

ITEM 9.7. ATTACHMENT 2
41 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
NR.8.4.
1 Ensure that at least 50 percent of the City’s office supply purchases are comprised of recycled or reusable products. CM Ongoing GF Ongoing.

NR.8.5.
1 Implement the State’s source reduction and recycling element (required by the California Integrated Waste Management Act) and the household hazardous waste element (required by PRC 41500-41510).

CM / PW Ongoing GF
Ongoing per current legislation.

X – C U L T U R A L A N D H I S T O R I C R E S O U R C E S E L E M E N T CHR.1.

1.1 Establish a permanent museum or cultural center to be used to display artifacts, documents, and public art relevant to the City’s history and cultural diversity.

CM / HRC 2010 GF
There is an unofficial historical society
for Rancho Cordova that meets at City
Hall and keeps some of the historical
items at City Hall.

CHR.1.

1.2 Establish a Historic Resources Commission that is responsible for facilitating the collection, preservation, and display of the City’s history. CM 2007 GF Not Complete CHR.1.

1.3 Commence and continue collection of the artifacts, photographs, memorabilia, and oral history of the community. HRC Ongoing GF Ongoing with different departments working with outside agencies.

CHR.1.

1.4 Locate an interim facility to show and/or exhibit items of historic or cultural value. Establish exhibits for historic and cultural items at City Hall CM / HRC 2007 GF This has been established at the City Hall office.

CHR.1.

1.5 Compile a thorough record of the City’s incorporation, including records, documents, photos, and artifacts. HRC 2008 GF Progress has been made and is still ongoing.

CHR.1.

2.1 Develop and regularly update a comprehensive historic resources inventory, coordinating with other agencies as necessary. The inventory will contain a list of all locally historically significant properties, as well as historic archaeological and paleontological resources in the Planning Area and a map depicting their locations.

PL / HRC 2007 /
Ongoing GF
Not complete.

CHR.1.

2.2 Pursue recognition of all eligible historic properties by the National Register of Historic Places and California Register of Historical Resources. HRC Ongoing GF Not complete.

CHR.1.

2.3 Improve and interpret Kilgore Cemetery. Interpreting the cemetery will include determining who is buried in the older portion of the site and increasing public awareness of the cemetery’s significance.

CM / HRC 2008 GF
Ongoing.

CHR.1.

2.4 Consider establishing review procedures for remodeling and reconstruction of buildings and other structures. B / PL 2007 / 2008 GF Complete per the entitlement and
building permit review process. DST is
also used to expedite reviews.

CHR.1.

3.1 Require historic resources and paleontological studies (i.e., archaeological and historical investigations) for all applicable discretionary projects, in accordance with CEQA regulations. The studies should identify paleontological, historic, or cultural resources in the project area, determine their eligibility for inclusion in the California Register of Historical Resources, and provide mitigation measures for any resources in the project area that cannot be avoided.

PL PR AF
Ongoing per the entitlement review
process and CEQA requirements.

Page 199 of 1447 ends

ITEM 9.7. ATTACHMENT 2
42 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
CHR.1.

3.2 Incorporate the following two conditions in applicable permits for all discretionary projects.
- The Planning Department shall be notified immediately if any cultural resources (e.g., prehistoric or historic artifacts) or paleontological resources (e.g., fossils) are uncovered during construction. All construction must stop in vicinity of the find and an archaeologist that meets the Secretary of the Interior’s Professional Qualifications Standards in prehistoric or historical archaeology or a paleontologist shall be retained to evaluate the finds and recommend appropriate action.
- The Planning Department shall be notified immediately if any human remains are uncovered and all construction must stop in vicinity of the find. The Planning Division shall notify the County Coroner according to Section 7050.5 of California’s Health and Safety Code. If the remains are determined to be Native American, the procedures outlined in CEQA Section 15064.5 (d) and (e) shall be followed.

PL PR AF
Completed per the standard conditions
of approval and mitigation measures.

CHR.2.

1.1 Establish a Cultural Arts Commission that will be responsible for coordinating cultural events, parades, festivals, coordinate and communicate with cultural and ethnic communities (with the City’s Public Information Officer), and other activities as determined by the City Council..

CM / PIO 2007 GF
A Cultural Arts Commission has not
been created, however, this is achieved
by other means through partnership
with the Cordova Community Council
and community artists. City Council
adopted an Arts Strategic Plan in
December of 2019 and it provides a
roadmap for continuing to build art
programs in the community. The Arts
Strategic Plan identifies guiding
principles, desired outcomes, a
cornerstone project, types of facilities
needed, the need for staff to guide
current and future efforts, cultivation of
artists, partnerships for the arts, city
funding for art and artists, as well as
near-term, mid-term, and long-term
actions. Through these efforts and
partnerships the desired action is
achieved.

CHR.2.

1.2 Encourage development projects to include design features that identify and celebrate the different cultures that make up Rancho Cordova by updating, as necessary, the Design Guidelines to include provisions for cultural identity in development projects.

PL / CAC PR GF
Completed, but could provide more
specifics in the design guidelines.

CHR.2.

1.3 Encourage and invite cultural groups and organizations to participate/plan/operate citywide events and to showcase the City’s cultural diversity at these events
CAC / PIO Ongoing GF
Ongoing.

Page 200 of 1447 ends

ITEM 9.7. ATTACHMENT 2
43 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
CHR.2.

2.1 Provide City information (news, bulletins, application forms, etc) pursuant to programs designed to best capture the ethnic diversity of the community (i.e. in the four major languages used in the community and other languages on demand).

PIO / CM /

CAC / PL/ B/
PW
Ongoing GF
Complete and ongoing as part of our
development service counter.

The City of Rancho Cordova Website
was updated in 2021.

CHR.2.

2.2 Reach out to all ethnic groups in the City and invite and encourage their participation in City government.

PIO / CAC/
CM/ PL/ PW Ongoing GF Complete and ongoing.

CHR.3.

1.1 Work with community groups to establish a performing arts center in Rancho Cordova, ideally within the Downtown or Convention Overlay. CAC 2010 GF A performing arts center is located at
the High School. The proposed Civic
Center may include a performing arts
center
CHR.3.

1.2 Work with local schools and other educational and youth outlets to promote artistic performances by children and artistic education programs for children. Work with school districts to establish performing arts facilities in high school and junior high school campuses.

CAC Ongoing GF
Not complete under CAC, but work is
done under the City’s outreach
programs under different departments.

The Mills Station Art and Cultural
Center (MACC) provides Student Art
Shows every year.

CHR.3.

1.3 Showcase youth artwork in public venues such as City Hall, public libraries, and other places throughout the community. CAC Ongoing GF Not complete under CAC, but work is
done under the City’s outreach
programs under different departments.

CHR.3.

1.4 As necessary, revise City ordinances to allow and promote on street visual art, dance, and theatrical performances in the Downtown. Include such provisions in the Downtown Specific Plan.

CAC / PL 2008 GF
Encouraged within the Folsom
Boulevard SPA, open space and
design guidelines, and the zoning code,
but not required.

CHR.3.

1.5 Work with existing theatre, music, arts, and other performing arts groups to help them find locations in Rancho Cordova. CM / ED Ongoing GF Ongoing as work is done under the
City’s outreach programs under
different departments.

CHR.3.

2.1 Establish a Cultural Arts Commission that is responsible for establishing a public art program, directing the use of public funds for art in public places, encouraging the use of art in private development projects, and administering other cultural and artistic programs for the City as deemed appropriate by the City Council.

CM / PL 2007 GF
City Council adopted an Arts Strategic
Plan in December of 2019 and it
provides a roadmap for continuing to
build art programs in the
community. The Arts Strategic Plan
identifies guiding principles, desired
outcomes, a cornerstone project, types
of facilities needed, the need for staff to
guide current and future efforts,
cultivation of artists, partnerships for
the arts, city funding for art and artists,
as well as near-term, mid-term, and
long-term actions. Through these
efforts and partnerships the desired
action is achieved.

Page 201 of 1447 ends

ITEM 9.7. ATTACHMENT 2
44 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
CHR.3.

2.2 Promote the incorporation of monuments, plaques, signs, or artwork identifying Rancho Cordova’s diverse history into development projects and on pedestrian and bicycle trails. Possible highlights include the area’s agricultural, mining, Pony Express, and aerospace and aviation activities.

CAC / PL Ongoing GF
Not complete under CAC, but is
discussed as part of the entitlement
review and internal city projects. Rio
Del Oro Sign program includes sign
designs with cobbles from the mine
tailings as a highlight to the mining
in the area.

X I – S A F E T Y E L E M E N T
S.1.1.1
Conduct an evaluation, as part of the CEQA process, of the potential safety hazards of proposed development within the City and mitigate impacts as appropriate and practical to ensure a reasonable level of safety for residents, workers, and property owners.

PL Ongoing AF
Ongoing as new regulations and
processes evolve as part of CEQA
updates and case law. In addition, the
City includes a Hazard Mitigation Plan
S.1.2.1
Participate in State mutual aid agreements with neighboring cities and counties; State and federal emergency relief agencies; and private enterprises such as Red Cross, Salvation Army, and local medical institutions to assist in shelter, relief, and first aid operations. Encourage cooperation among adjacent communities to provide backup fire suppression and law enforcement assistance in emergency situations.

PD 2006 /
2007 GF
Complete and ongoing.

S.1.2.2
Collaborate with Folsom Cordova and Elk Grove Unified School Districts, Cordova Park and Recreation District, the faith based community, and other public entities to continue to offer public safety education classes, including but not limited to personal safety, fire safety, traffic safety, and bicycle safety.

PD / F / PIO Ongoing GF
Ongoing.

S.1.3.1
Create, adopt, and update, as needed a local Emergency Management Plan identifying leadership, representatives, coordination, and action for responding to emergencies in a timely and efficient manner.

CM / PD / F Ongoing GF
Updated, completed in 2019
S.1.3.2
Participate in the Standardized Emergency Management System (SEMS) and the National Incident management System (NIMS), and comply with the State of California Emergency Services Act.

PD / F Ongoing GF
Ongoing.

S.1.3.3
Develop and adopt a pre-disaster ordinance for post-disaster recovery and reconstruction that includes provisions for debris clearance, damage assessment, demolitions, re-occupancy and building moratorium criteria, fee waivers and deferrals, and expedited permitting procedures for repair and reconstruction.

CM / PD / F Ongoing GF
Ongoing per the emergency
preparedness plan coordinated with the
Facilities department. The MultiJurisdiction Hazard Mitigation Plan (HMP) update was competed in 2021
and adopted in March 2022
S.1.4.1
Develop and update as necessary risk assessments and emergency management provisions to maintain or improve the safety rating of Rancho Cordova as a community with low risk of disruption.

CM / PD / F Ongoing GF
Ongoing. The Multi-Jurisdiction
Hazard Mitigation Plan Update was
completed in 2021 and was adopted
in March 2022.

Page 202 of 1447 ends

ITEM 9.7. ATTACHMENT 2
45 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
S.2.1.1 Support the construction of flood control projects when clear dangers to life and property exist. PW Ongoing GF / AF Ongoing.

S.2.1.2
Participate in the National Flood Insurance Program by updating the floodplain management ordinance as necessary to help reduce future flood damage. Participation in the National Flood Insurance Program makes federally backed flood insurance available to homeowners, renters, and businesses owners in Rancho Cordova.

PW Ongoing GF / AF
Ongoing. The Multi-Jurisdiction
Hazard Mitigation Plan was adopted
in 2022. This is a 5 year Plan for the
region.

S.2.1.3
Participate with the City of Sacramento, the Army Corps of Engineers, and other Federal, State, and local governments and agencies to develop policies to finance, construct, and plan flood improvements to eliminate flooding in the City.

PW Ongoing GF
Ongoing.

S.2.2.1
Disapprove new projects that would result in new or increased flooding impacts on adjoining parcels or upstream and downstream areas, unless it can be shown that the existing drainage facilities are being improved to mitigate such impacts.

PL Ongoing AF
Complete and ongoing per the
entitlement review.

S.2.2.2
Preclude development within the 100-year floodplain, as determined by the most recent floodplain mapping available from the Federal Emergency Management Agency (FEMA) or other acceptable source, unless otherwise approved by the City floodplain administrator based on sitespecific mitigation.

PL Ongoing AF
Complete and ongoing per the
entitlement review. Include within the
zoning code overlay for development
restrictions.

S.2.2.3
On flood-prone parcels, locate development on portions of the site that are not subject to flooding, consistent with other policies of this General Plan or provide an approved grading plan showing no-net-loss of floodplain storage.

PW / PL Ongoing AF
Ongoing per the entitlement and
development permit review process.

S.2.2.4
Require every residential lot to have buildable area sufficient to accommodate a residence and associated structures outside the 100-year floodplain. Discourage the use of fill to create buildable area within the 100-year floodplain, except in extreme circumstances consistent with all other applicable policies and regulations, and after review to determine potential impacts on wildlife, habitat, and flooding on other parcels.

PW / PL Ongoing AF
Ongoing per the entitlement and
development permit review process.

S.2.2.5 Require vehicular access to the buildable area of all parcels to be at or above the ten-year floodplain elevation. PW / PL Ongoing AF Ongoing per the entitlement and development permit review process.

S.2.2.6
Preclude the creation of lots whose access will be inundated by flows resulting from a ten-year or greater storm event. Bridges or similar structures may be used to provide access over creeks or inundated areas, subject to applicable local, state, and federal regulations.

PW / PL Ongoing AF
Ongoing.

S.2.2.7
Discourage additional crossings of natural creeks in order to reduce potential flooding and access problems, except as needed to provide roadway and trail connections and preserve natural resource areas.

PL / PW Ongoing AF
Ongoing per the entitlement and
development permit review process.

S.2.2.8 Prohibit new and modified bridge structures that will cause an increase in water surface elevations of the 100-year floodplain, unless analysis clearly PL / PW Ongoing AF Ongoing per the entitlement and development permit review process.

Page 203 of 1447 ends

ITEM 9.7. ATTACHMENT 2
46 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
indicates that the physical and/or economic use of upstream property will not be adversely affected.

S.2.3.1
Require all new urban development projects to either incorporate runoff control measures to minimize peak flows of runoff or otherwise implement Comprehensive Drainage Plans.

PW Ongoing AF
Ongoing per the entitlement and
development permit review process.

S.2.3.2 Maintain drainage facilities in order to ensure their proper operation during storms. PW Ongoing AF Ongoing.

S.2.3.3 Prepare a Comprehensive Drainage Plan for all streams and their tributaries prior to any development within the 100-year floodplain. PW Ongoing GF Ongoing.

S.3.1.1 Continue to implement the Uniform Building Code to ensure that structures meet all applicable seismic standards. B Ongoing AF Complete and ongoing per the building permit review process.

S.3.2.1
Continue to require that all new construction projects complete a geotechnical report or conduct other appropriate analysis to determine the soils characteristics and associated development constraints and impose appropriate measures for geologically sensitive areas. This would include necessary measures to address expansive soil conditions.

B Ongoing BPF
Complete and ongoing per the building
permit review process.

S.3.2.2 Impose the appropriate mitigation measures for new development located in seismic and geologically sensitive areas. B Ongoing BPF Complete and ongoing per the building permit review process.

S.4.2.1 Coordinate with Regional Transit and companies with railways in the City to ensure that they implement all appropriate safety measures. PW / PL Ongoing AF Ongoing per the entitlement and development permit review process.

S.4.2.2 Investigate improvements in crossing gates and warning devices on a regular basis. PW 2007 / Ongoing GF Ongoing.

S.4.2.3
Make information on railroad crossing safety available at City Hall and on the City’s website to encourage safe practices by City residents and businesses.

PW 2007 /
Ongoing GF
Created a link to the RT site on the City
website
S.4.3.1
Evaluate the potential for grade separations at Mayhew Road, Bradshaw Road, Routier Road, Mather Field Road, and Zinfandel Drive roadway crossings.

PW 2007 /
Ongoing GF
Ongoing. Mather Field Road Heritage
Trail Complete. Zinfandel
overcrossing is Under Review.

S.4.3.2 Work with RT to design grade separations appropriate for each location. PW 2006 / 2007 BPF Completed and Ongoing.

S.4.3.3 Include the grade separations specified in Action S.3.3.1 in the Capital Improvement Plan, and collect fees to help fund their construction. PW 2007 / Ongoing GF Ongoing.

S.5.2.1
Adopt, and update as necessary, local standards for maximum acceptable exposure for the evaluation of hazardous facilities for potential to create hazardous physical effects at offsite locations that could result in death, significant injury, or significant property damage.

PW 2007 GF
Ongoing. Part of the entitlement
process

Page 204 of 1447 ends

ITEM 9.7. ATTACHMENT 2
47 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
S.5.3.1
Regularly review the City’s codes to ensure that City regulations reflect the most up-to-date standards for the storage, handling, and use of hazardous and toxic materials.

B / F Annually GF
Building & Safety continues to work
closely with Metro Fire and the
Sacramento County Environmental
Management Department to educate
the public on hazardous material
handling and storage. This is also
accomplished through enforcement of
the California Building Code, and other
provisions of the Health and Safety
Code.

S.5.3.2
During the review and approval process for development plans and building permits, ensure that secondary containment is provided for hazardous and toxic materials.

PL / PW / B /
F
Ongoing AF
Complete and ongoing per the
entitlement review. Building & Safety
continues to work closely with Metro
Fire and the Sacramento County
Environmental Management
Department to ensure hazardous
material handling and storage policies
are current with state and federal
regulations. This is also accomplished
through enforcement of the California
Building Code, and other provisions of
the Health and Safety Code
S.5.3.3
Require all sites that are suspected or known to contain hazardous materials and / or are identified in a hazardous material / waste search to be reviewed, tested, and remediate for potential hazardous materials in accordance with all local, state, and federal regulations.

B / F Ongoing GF
Building & Safety continues to work
closely with Metro Fire and the
Sacramento County Environmental
Management Department to ensure
hazardous material issues are dealt
with expediently and are current with
state and federal regulations. This is
also accomplished through
enforcement of the California Building
Code, and other provisions of the
Health and Safety Code.

S.5.4.1 Support the continued enforcement of permitting requirements for radioactive materials. Fire Ongoing GF Ongoing.

S.5.4.2 Enforce public safety standards for the use of radioactive materials, including the placarding of transport vehicles. Fire Ongoing GF Ongoing.

S.5.5.1
Require industries which store and process hazardous or toxic materials to provide a buffer zone between the materials and the property boundaries; the buffer zone must be sufficient to protect public safety, as determined by the Planning Department..

Fire / PD Ongoing GF
Ongoing.

S.5.5.2 Consider the impact of proposed industrial development projects with respect to transport of hazardous materials within the city. Locate uses PL / F / PW Ongoing AF Ongoing

Page 205 of 1447 ends

ITEM 9.7. ATTACHMENT 2
48 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
requiring substantial transport of hazardous materials to direct such traffic away from the city’s residential and commercial areas.

S.5.6.1
Continue to coordinate with the State Office of Emergency Services, the State Department of Toxic Substances Control, the State Highway Patrol, County of Sacramento, the Sacramento Metropolitan Fire District, the Rancho Cordova Police Department, and other appropriate agencies in hazardous materials route planning and incident response.

CM / F / PD Ongoing GF
Ongoing.

S.5.6.2
Request that state and federal agencies that regulate the transportation of hazardous materials review regulations and procedures, in cooperation with the City, to determine means of mitigating the public safety hazard in urbanized areas.

PD / F Ongoing GF
Ongoing.

S.6.1.1 Limit the height of structures consistent with Federal Aviation Regulation (FAR) Part 77 regulations. PL / B Ongoing GF / AF Complete and ongoing per the entitlement review.

S.6.1.2 Site new land uses consistent with the CLUP for noise impacts and safety restrictions. PL / B Ongoing AF / GF Complete and ongoing per the entitlement review.

S.7.1.1
Adopt and periodically update development standards and design guidelines consistent with current Crime Prevention through Environmental Design (CPTED). Specifically, incorporate provisions to address the following:
- Natural Surveillance. Intended to keep intruders easily observable, natural surveillance provisions maximize visibility of people, parking areas, and building entrances (e.g., doors and windows that look out on to streets and parking areas, pedestrian-friendly sidewalks and streets, front porches, adequate nighttime lighting).
- Territorial Reinforcement. Physical design can create or extend a sphere of influence. Users then develop a sense of territorial control while potential offenders, perceiving this control, are discouraged. This design concept is implemented by features that define property lines and distinguish private spaces from public spaces using landscape plantings, pavement designs, gateway treatments, and fences. - Natural Access Control. A design concept directed primarily at decreasing crime opportunity by denying access to crime targets and creating a perception of risk for offenders. This design concept is achieved by designing streets, sidewalks, building entrances, and neighborhood gateways to clearly indicate public routes, and also by discouraging access to private areas with structural elements. - Target Hardening. This is accomplished by adding features that prohibit entry or access, including window locks, dead bolts for doors, and interior door hinges.

PD / PL 2007 /
Ongoing GF
Mentioned in the City’s standards. The
Police Dept reviews and comments on
new development
S.7.1.2 Adopt and implement a City of Rancho Cordova Uniform Security Code to ensure all structures meet applicable security standards. PD / PL 2006 /
2007 /
Ongoing
GF
Not Completed.

Page 206 of 1447 ends

ITEM 9.7. ATTACHMENT 2
49 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
S.7.1.3 Adapt transit-oriented development guidelines to the needs of crime prevention to the extent possible. PD / PL 2007 / Ongoing GP / AF Not Completed. However, the Police
Dept reviews and comments on new
development
S.8.1.1
Complete a review of police services in the City on an annual basis and provide funding for additional services as needed and in conjunction with increased development.

PD 2006 /
2007 GF
Ongoing.

S.9.1.1
Continue to review new development for adequate water supply and pressure, fire hydrants, and access to structures by fire fighting equipment and personnel.

FD Ongoing GF
Ongoing per the entitlement and
development permit review process.

S.9.1.2 Continue to review projects for compliance with the Fire Code as part of the building permit process. FD Ongoing AF Ongoing.

S.9.1.3
Work with SMFD to develop high visibility fire prevention programs, including those that provide voluntary home inspections and increase awareness of home fire prevention measures.

B Ongoing BPF
Building & Safety continues to work
closely with Metro Fire to educate the
public on fire safety issues. This is also
accomplished through enforcement of
the California Fire Code.

S.9.1.4
Require on-site fire suppression systems for new commercial and industrial development, as well as multi-family residential development with five or more units, to reduce the dependence on fire department equipment and personnel.

FD Ongoing GF
Ongoing.

S.9.1.5 Continue to maintain, periodically update, and test the effectiveness of the City’s Emergency Management Plan. FD Ongoing GF Ongoing.

S.9.1.6
Require the installation of earthquake-triggered automatic gas shut-off sensors in high-occupancy facilities and in industrial and commercial structures.

PD Ongoing GF
Ongoing.

S.9.1.7 Continue to enforce all existing codes and ordinances regarding fire protection, including building inspection and vegetation management. B FD / NS Ongoing BPF / GF Complete and ongoing per the building
inspection and code enforcement
process.

XII – Air Quality Element
Complete and ongoing. All city facilities
are held to the standards required for
energy conservation and sustainable
design, in accordance with state and
federal guidelines and requirements.

S.9.1.8 Coordinate the design and installation of traffic control and calming measures to minimize impacts on emergency vehicle responses. PW / FD Ongoing GF Ongoing per the entitlement and development permit review process.

S.9.1.9
The City shall require that future projects are not initiated without assurance from the Sacramento Metropolitan Fire District that sufficient service capacity exists for fire protection and emergency medical services.

Service capacity considers the proximity of fire stations, availability of PW / PL / FD Ongoing GF
Ongoing.

Page 207 of 1447 ends

ITEM 9.7. ATTACHMENT 2
50 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
personnel and equipment, water flow and pressure to the site, and adherence to Fire District construction and design requirements.

X I I – A I R Q U A L I T Y E L E M E N T
AQ.1.1.
1 Use the emissions guidelines produced by the California Air Resources Board, SMAQMD, and SACOG to ensure that City facilities and operations comply with mandated measures.

PL Ongoing GF
Ongoing per the entitlement and
development permit review process.

AQ.1.1.
2 Support SMAQMD in the development of improved ambient air quality monitoring capabilities, as well as the establishment of standards that more adequately address the air quality impacts of proposed project plans and proposals.

PL Ongoing GF
Ongoing per the entitlement and
development permit review process.

AQ.1.1.
3 Support intergovernmental efforts directed at adopting stricter standards related to lowest emission technology vehicles, and more efficient burning engines and fuels (e.g., HVAC, generators, construction equipment, stricter tailpipe emissions standards, etc.).

CM Ongoing GF
Ongoing.

AQ.1.1.
4 Update the General Plan as necessary if updates to the Sacramento Area Regional Ozone Attainment Plan would create inconsistencies between future buildout of the General Plan Planning Area and the Attainment Plan.

PL Ongoing GF
Ongoing.

AQ.1.2.
1 Coordinate with SMAQMD through the environmental review process to ensure that proposed projects would not significantly affect the region’s ability to meet State and federal air quality standards.

PL Ongoing GF
Ongoing per the entitlement and
development permit review process.

AQ.1.2.
2 Require project proponents to coordinate with SMAQMD on appropriate methodologies for evaluating project emissions and air quality impacts (e.g., emissions modeling software, SMAQMD’s thresholds of significance, etc.).

PL Ongoing AF
Ongoing per the entitlement and
development permit review process.

AQ.1.2.
3 Require all new development projects that exceed SMAQMD’s thresholds of significance to incorporate design, construction material, and/or other operational features that will result in a 15 percent reduction in emissions when compared to an “unmitigated baseline” project.

PL Ongoing AF
Ongoing per the entitlement and
development permit review process.

AQ.2.1.
1 Support the location of ancillary employee services, including childcare, restaurants, banking facilities, and convenience markets, at major employment centers for the purpose of reducing mid-day vehicle trips.

PL / ED Ongoing GF
Ongoing per the entitlement and
development permit review process.

AQ.2.2.
1 Promote compact development within one-quarter to one-half mile of rail transit stations and transit stations along enhanced transit corridors. PL Ongoing GF Ongoing per the entitlement and
development permit review process.

Page 208 of 1447 ends

ITEM 9.7. ATTACHMENT 2
51 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
AQ.2.2.
2 Require greenfield areas of the City to be developed in keeping with the City’s Building Block Concept of livable, walk able neighborhoods with services and employment opportunities integrated within every Village of the community.

PL Ongoing GF
Ongoing per the entitlement and
development permit review process;
however specific “blocks” have not
been defined.

AQ.2.3.
1 Identify and adopt incentives for planning and implementing infill development projects within urbanized areas and near job centers and transportation nodes.

PL
2007 /
2008 /
Ongoing
GF
Not completed.

AQ.2.4.
1 Provide buffers and setbacks between sensitive land uses and sources of air pollution. PL Ongoing AF Completed and ongoing.

AQ.2.4.
2 Continue to implement criteria for all new parking lots to include tree plantings that will result in 50 percent shading of parking lot surface areas within 15 years.

PL / PW Ongoing GF
Ongoing per the entitlement and
development permit review process.

AQ.3.1.
1 Facilitate street design that encourages biking and walking in both new and established areas. PW / PL Ongoing GF / CIP
Ongoing per the entitlement and
development permit review process.

AQ.3.1.
2 Require all new development to be designed to enable easy pedestrian and bicycle access and circulation. PW / PL Ongoing AF
Ongoing per the entitlement and
development permit review process.

AQ.2.1.
1 Develop and distribute user-friendly maps of the City’s existing and planned pedestrian and bicycle facilities to businesses and post on the City’s website.

PIO Ongoing GF
Ongoing per the entitlement and
development permit review process.

Maps are provided online and at City
Hall. The City of Rancho Cordova
Website was updated in 2021.

AQ.3.2.
1 Provide and / or adequately advertise shuttles from local transit stations to special event and civic centers. PW / PIO Ongoing GF
Maps are provided online and at City
Hall. The City of Rancho Cordova
Website was updated in 2021.

AQ.3.2.
2 Encourage employers to provide: direct shuttle service to light rail; transit subsidies; bicycle facilities; ridesharing; flex schedules and alternative work schedules, including telecommuting and work-at-home programs; and preferential parking for carpools.

PW / PL Ongoing GF
Part of TMA
AQ.3.2.
3 Support the development of Transportation Demand Management services through the City’s Transit-Related Services Tax Area that result in active marketing of transit services, ride sharing programs, bike and pedestrian facilities, transit facilities, and provision of transit subsidies that provide air quality benefits.

PW Ongoing Transit tax
Ongoing.

AQ3.2.
4 Require that new development pay its fair share of the cost of transit facilities and the operations and maintenance of transit services. PW Ongoing AF Ongoing.

AQ3.3.
1 Encourage commercial, retail, and residential developments to participate in or create Transportation Management Associations. PW Ongoing AF Ongoing.

AQ.3.3.
2 Recommend that business owners schedule deliveries at off-peak traffic periods. PW Ongoing GF Ongoing.

Page 209 of 1447 ends

ITEM 9.7. ATTACHMENT 2
52 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
AQ.3.4.
1 Require designated carpool and vanpool parking in all new office developments. PW / PL Ongoing GF Encouraged during entitlement review AQ.3.4.
2 Consider developing a model trip reduction and air quality improvement program for City employees. The program could include flexible or compressed work schedules, commuter matching services, telecommuting options, and preferential carpool / vanpool parking, transit subsidies.

PL / PW / PIO 2007 /
2008
GF / transit
tax
City Hall location includes EV Stations.

Flexible work schedules for employees
are available
AQ.4.1.
1 Require energy-conserving features in the design and construction of new development. Many options exist for reducing pollution from energyproducing systems, including the following:
- Requiring the use of the best available technologies to reduce air pollution standards.
- Using building materials and methods that reduce emissions and improve indoor air quality (e.g., LEED certification, LEED Green Buildings, EPA Green Building, etc.).
- Requiring that development projects be located and designed in a way that minimizes direct and indirect emission of air contaminants. - Installing efficient heating equipment and other appliances, such as water heaters, swimming pool heaters, cooking equipment, refrigerators, furnaces, and boiler units.
- Utilizing automated time clocks or occupant sensors to control heating systems.

B / PW Ongoing GF
Complete and ongoing. Currently the
City enforces the provisions of the
California Energy Code, the Green
Building Standards and the Building
Energy Efficiency Standards that are
referenced within.

AQ.4.1.
2 Encourage the use of cost-effective and innovative emission-reduction technologies in building components and design. PW / PL Ongoing AF Ongoing, future plans may involve work
with economic development and
SACOG for funding opportunities and
projects.

AQ.4.1.
3 Support the use of building materials and methods that increase efficiency beyond State Title 24 standards. B / PL Ongoing AF
Complete and ongoing per the
entitlement and building permit process
review.

AQ.4.1.
4 Encourage the use of “EPA Energy Star”-certified appliances. B / PIO Ongoing GF Ongoing.

AQ.4.1.
5 Promote the implementation of sustainable design strategies for “cool communities,” such as installing reflective roofing or light-colored pavement and planting urban shade trees.

B / PIO Ongoing GF
Complete and ongoing per the building
permit process review.

AQ.4.1.
6 Consider incorporating energy-conserving design and construction techniques in all City facilities. B Ongoing GF
Complete and ongoing per the building
inspection and code enforcement
process.

XII – Air Quality Element
Complete and ongoing. All city facilities
are held to the standards required for
energy conservation and sustainable

Page 210 of 1447 ends

ITEM 9.7. ATTACHMENT 2
53 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
design, in accordance with state and
federal guidelines and requirements.

AQ.4.2.
1 Replace the City’s fleet vehicles with new vehicles that utilize the lowest emission technology available, whenever economically feasible. CM Ongoing GF / Grants Completed and on-going AQ.4.2.
2 Consider adopting a policy that provides a preferential treatment to contractors using reduced emission equipment for City construction projects and for City contracts for services (e.g., garbage collection).

CM / B 2006 /
2007 GF
Not complete. The City can expedite
the review for priority projects, but does
not have a process for preferential
treatment.

AQ.4.2.
3 Encourage lowest emission technology buses in public transit fleets. CM Ongoing GF Complete and ongoing.

AQ.4.2.
4 Promote developments and street systems that support the use of neighborhood electric vehicles. PW / PL Ongoing / PR AF Not Complete AQ.4.2.
5 Adopt an ordinance that limits the amount of time diesel-powered trucks, buses, and other heavy vehicles may idle in accordance with California Air Resources Control Board rules for mobile TAC sources, and that restricts placing new sensitive receptors within the proximity of known toxic air contaminant (TAC) producing facilities and land uses. Sensitive receptors shall be located a safe distance from TAC sources as described in California Air Resources Board guidelines and Sacramento Air Quality Management District requirements.

PW 2007 /
2008 GF
Ongoing. Included in the Air Quality
District provisions and CEQA review.

AQ.4.4.
1 Enforce construction-related air quality mitigation measures adopted through the CEQA process. PL Ongoing AF Complete and ongoing.

AQ.5.1.
1 Provide air quality information on the City’s website, including links to public information provided by SMAQMD and the California Air Resources Board.

PIO Ongoing AF
Ongoing. The City of Rancho
Cordova Website was updated in
2021.

AQ.5.1.
2 Encourage employers to post flyers about carpools, vanpools, and other modes of transportation that contribute to improved air quality in locations that are easily visible to employees.

PIO Ongoing GF
Ongoing.

X I I I – N O I S E E L E M E N T
N.1.1.1
Adopt a Noise Ordinance with noise level performance standards, including maximum allowable noise exposure, ambient vs. nuisance noise, method of measuring noise, and enforcement procedures.

PL / CM 2007 GF
Sound regulated per RCMC 6.68 (noise
control). This standard is outdated and
taken from the County. Needs revision
and guidelines for mitigation.

N.1.2.1 Require new development of noise-creating uses to conform to the City’s maximum noise levels. PL Ongoing AF Completed and ongoing as part of the entitlement process.

Page 211 of 1447 ends

ITEM 9.7. ATTACHMENT 2
54 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
N.1.2.2
Require an acoustical analysis as part of the environmental review process when noise-sensitive land uses are proposed in areas where current or projected exterior noise levels exceed the City’s standards.

PL Ongoing AF
Completed and ongoing as part of the
entitlement process.

N.1.2.3
Require any potential noise impacts identified during the acoustical analysis to be mitigated in the project design to the maximum extent feasible.

PL Ongoing AF
Completed and ongoing as part of the
entitlement and building permit
process. Is also required per CEQA
analysis.

N.1.3.1
Require an acoustical analysis as part of the environmental review process when proposed non-residential land uses are likely to produce noise levels that exceed the City’s noise standards. The acoustical analysis must be prepared by a qualified person experienced in environmental noise assessment and architectural acoustics, and must estimate existing and projected cumulative noise levels and compare those levels to the policies within this Element.

PL Ongoing AF
Completed and ongoing as part of the
entitlement process.

N.1.3.2 Require any noise impacts identified in the acoustical analysis to be mitigated in conjunction with the project design. PL Ongoing AF Completed and ongoing as part of the entitlement and CEQA review process.

N.1.4.1
Limit construction activity to the hours of 7 a.m. to 7 p.m. weekdays and 8 a.m. to 6 p.m. weekends when construction is conducted in proximity to residential uses.

PL / PW / B Ongoing AF / BPF
Complete and ongoing per the noise
element and municipal requirements.

N.1.4.2
Consider restricting the hours of operation of loading docks, trash compactors, and other noise-producing uses in commercial areas that are adjacent to residential uses.

PL Ongoing AF
Completed and ongoing as part of the
entitlement and building permit
process.

N.1.4.3 Require stationary construction equipment and construction staging areas to be set back from existing noise-sensitive land uses. PL Ongoing AF Completed and ongoing as part of the
entitlement and building permit
process.

N.1.6.1
Develop guidelines, strategies, and standards specifically related to maintaining acceptable noise levels in higher density development.

Consider design and construction standards that minimize noise conflicts between residents with shared walls or floors / ceilings.

PL / B 2007 GF
There are indirect regulations and
guidelines (i.e. sound wall,
landscaping, UBC requirements), but
nothing within the zoning code.

N.2.1.1 Encourage placement of light rail lines below the grade of the roadway in order to reduce noise impacts. PW / PL Ongoing GF This has not been achieved.

N.2.2.1
Assess the significance of the noise increase of all roadway improvement projects in existing areas according the following criteria:
- Where existing traffic noise levels are less than 60 dB Ldn at the outdoor activity areas of noise-sensitive uses, a +5 dB Ldn increase in noise levels due to roadway improvement projects will be considered significant; and
- Where existing traffic noise levels range between 60 and 65 dB Ldn at the outdoor activity areas of noise-sensitive uses, a +3 dB Ldn increase in noise levels due to roadway improvement projects will be considered significant; and
PL / B Ongoing AF / BPF
Complete and ongoing per the
entitlement review.

Page 212 of 1447 ends

ITEM 9.7. ATTACHMENT 2
55 | P a g e
Rancho Cordova 2021 General Plan Annual Report
Action Responsible
Party
Time
Frame
Funding
Source
Status 2021
- Where existing traffic noise levels are greater than 65 dB Ldn at the outdoor activity areas of noise-sensitive uses, a +1.5 dB Ldn increase in noise levels due to roadway improvement projects will be considered significant.

N.2.3.1 Adopt a Citywide noise reduction program to reduce traffic noise and other noise levels. PL / PW 2007 / 2008 GF
This has not been achieved. However,
the City is implementing rubberize
asphalt in certain sections on
thoroughfares. The rubber asphalt
reduces vehicle tire noise.

Page 213 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
1 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Goal
H.1 Seek a balance of housing opportunities appropriate for the range of jobs available and planned in the city.

Policy
H.1.1
Improve the City’s jobs-housing balance through ensuring that housing development in Rancho Cordova provides opportunities for all income levels in order to serve the full range of available and projected jobs in the City.

Action
H.1.1.1
The City will work with the Economic
Development Department to inquire with larger
employers in the community to determine salary
information and employee preference regarding
housing type.

General Fund
Economic
Development
Department
Inquire with employers once every
two years.

The City Economic
Development
Department receives
California Employment
Development
Department (EDD)
data with salary
information in relation
to industries.

Policy
H.1.2
Maintain adequate sites that support a range of housing types appropriate for the City’s housing needs, taking into account employment projections, household growth, and the City’s share of regional housing needs.

Page 214 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
2 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Residential development projects of 100 gross
acres or more shall include a minimum of 5
percent of the total project residential
developable acreage (net) for residential uses of
30 units per acre or higher. This minimum high
density acreage requirement is calculated to
satisfy projected RHNA to the City. Additionally
the City will require a minimum of 5 percent for
residential uses of 10 units per acre or higher.

Development projects with a requirement of less
than 5 acres in either or both categories may opt
to designate land off-site, if deemed appropriate
for the project. If projects propose densities
higher than the identified density, the required
acreage shall be decreased accordingly.

For example, if a project is required to provide 15
acres at 30 units per acre, that project could
alternatively provide 11.25 acres at 40 units per
acre. Similarly, if the project’s requirement for
land with density of 10 units per acre was 6
acres, the project could alternatively provide 4
acres at 15 units per acre.

For the purpose of satisfying the 5 percent for
land uses at or above 30 units per acre, sites
must meet the following requirements:

Sites must be zoned exclusively residential.

Acres used to satisfy RHNA requirements will be
required to maintain set minimum densities.

Sites must be of sufficient size to accommodate a
minimum of 16 units per site.

Action
H.1.2.1
Sites must be proximate to public transportation
routes which provide ready access to fixed rail.

General Fund, Local Housing
Trust Fund
Planning
Department,
Housing Division
Ongoing, as residential applications
are received.

The City has met the
high-density set-asides
in all of the new
Development
Entitlements that have
been recently
approved or are
currently under review.

As part of the
development review
process, all new
housing projects are
reviewed for their
compliance to these
housing standards.

Page 215 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
3 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Policy
H.1.3 Promote a broader range of housing options for executives.

Action
H.1.3.1
The City’s Zoning Code accommodates and
facilitates the development of executive housing
options in Specific Plans and large subdivisions
(500+ units) in the Rural Residential (RR) and the
Estate Residential (ER) zones.

General Fund Planning
Department
Ongoing, as projects are possessed
though the Planning Department.

The Suncreek and Rio
Del Oro Specific Plans
were approved in 2013
and 2016,
respectively. These
plans include a variety
of housing types and
densities, ranging from

6.1 dwelling units per
acre (du./acre) to 40
du./acre. As
addressed in the
2021-2029 Housing
Element land use and
sites inventory, the
City’s current zoning
standards,
accompanied with
vacant land, has the
capacity to meet the
City’s fair share of the
housing needs within
the current planning
cycle.

Policy
H.1.4 Promote higher density housing in close proximity to transit, employment, and appropriate services, such as transit-oriented development As part of an ongoing effort to promote transitoriented development the City will coordinate with regional partners to incentivize the production of
housing for persons living and working in same
Action community.

H.1.4.1
o Density Bonus - The TOD overlay provides
substantial density bonus up to 80
units per acre for projects that are within onequarter of a mile of transit stations.

General Fund
Public Works,
Housing Division,
Planning, and
Economic
Development
departments
The City will coordinate efforts to
apply for funding for transit-oriented
developments as Notices of Funding
Available (NOFAs) are released and
will create project requirements and
incentives to encourage reduced
auto use in transit nodes.

The City is maintaining
a commitment to TOD
high-density
residential in review of
all projects to be
located adjacent to
Regional Transit
access points. The
Crossings at New
Rancho, an affordable
multifamily project
near the Zinfandel light
rail station, was

Page 216 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
4 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
o SACOG – The City will continue to work with
SACOG to identify and apply for grant
opportunities aimed at planning and promoting
TOD development along the Regional Transit
Light Rail lines.
o Regional Transit – The City will continue to
cooperate with Regional Transit in identifying
transit needs in the community and working to
provide viable solutions. These may include
negotiating new bus routes, partnering to provide
special or commuter routes, creating and
maintaining a discount RT pass program for lowand very low-income residents living in the City’s affordable housing, and leveraging new infill
development projects around existing mass
transit infrastructure (Transit Oriented
Development).
o Local and Regional Complete Streets Advocate
groups – The City will continue to work with local
and regional Complete Streets Advocate groups
to improve transportations options in the City,
including bicycle lanes, improved pedestrian
access, and better connectivity between existing
alternative transportation options and local mass
transit (such as dedicated pedestrian pathways),
particularly in development projects located
immediately adjacent to transit services.
completed and is
currently occupied.

The City purchased a
10- acre TOD property
in 2018 and has plans
to provide housing and
community uses at this
site. The Sunrise
Crossings Apartments,
an 82-unit affordable
housing development
will be under
construction in 2022
adjacent to the
Sunrise light rail
station. In addition, all
new master plans and
specific plans currently
under review contain a
variety of multimodal
transportation options
that focus on linkages
(i.e., bike to bus, bus
to light rail) to improve
connectivity and usage
of existing transit
systems.

Policy
H.1.5
Developers of new residential projects within the newly developing areas of the City (generally in the large, vacant areas south of Highway 50) shall prepare an Affordable Housing Plan (Plan) for the project for City review and approval that identifies the project’s plan for providing affordable housing.

Action
H.1.5.1
The City has established the following guidelines
to provide direction for the review of Affordable
Housing Plans associated with individual
development projects and to provide direction for
the preparation of an Affordable Housing
Ordinance if one is to be developed.

General Fund
Housing Division,
Planning and
Economic
Development
Departments
The Affordable Housing Plan
obligations will be implemented as
projects are received by the Planning
Department.

The City has
negotiated Affordable
Housing Plans (AHPs)
with the developers of
the Suncreek Specific
Planning Area, Rio del
Oro, and The Ranch

Page 217 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
5 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
The Affordable Housing Plan shall be approved
in conjunction with the earliest stage of project
entitlement, typically with the City Council
approval of the Specific Plan, Development
Agreement, or other primary land use
entitlement.

The Affordable Housing Plan shall specify and
include the following:
1) A projection of the number of dwelling units
that will be developed as affordable to extremely
low-, very low-, low , moderate-, and above
moderate-income households
2) The number of affordable ownership and rental
units to be produced. Such split shall be
approved by the City Council based on housing
needs, market conditions, and other relevant
factors. The split of ownership and rental units
shall be addressed within the Plan of each
individual project.
3) Program options within project-specific
Affordable Housing Plans may include but are not
limited to the following:

The timing for completion of affordable housing
obligations includes the following considerations:
‐ Actual production (on-site or off-site) of
affordable units (including
ownership and rental opportunities in the form of
corner units, halfplexes, duplexes, cottages,
creative alternative housing products, etc.),
prioritizing production in areas of high
opportunity.
‐ Land dedication (on-site and off-site).
‐ Rehabilitation of existing residential structures
located within existing City neighborhoods.
‐ Payment of in-lieu fees.

Special Planning Area,
as per Housing
Element standards.

Future Specific Plans
will also include AHPs.

The total of these
three areas with AHPs
is 5,080 affordable
units at build out.

Page 218 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
6 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
For projects proposing to construct affordable
housing units or to renovate existing dwellings,
the City generally supports
construction/renovation of affordable dwellings
concurrent with the construction of market-rate
housing when feasible.
- For projects providing alternative contributions
(land dedication, funds, etc.), timing of such
contributions shall be identified in the project
specific Affordable Housing Plan, with the
expectation that the City will pursue construction
of affordable units generally concurrent with
construction of project market-rate housing.
4) At the City Council’s discretion, land or other
contributions provided by developers as specified
within project-specific Affordable Housing Plans
may be utilized to augment City efforts and the
efforts of its nonprofit partners to provide
affordable housing opportunities to all income
levels throughout the community. The City will
pursue supplemental funding to allow affordability
to households earning less than 50 percent of
area median income.
5) In order to ensure the production and
preservation of housing affordable to the City’s
workforce, no productive, reasonable program or
incentive option will be excluded from
consideration within project-specific Affordable
Housing Plans. Possible incentives may include,
but are not limited to:

Page 219 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
7 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Density bonuses
Fee waivers or deferrals (as reasonably
available) Expedited processing/priority
processing Reduced parking standards Technical
assistance with accessing funding Modifications
to development standards (on a case-by-case
basis) Other incentives
Action
H.1.5.2
The City will annually monitor and revise as
necessary, the Affordable Housing Plan
negotiation and development process to ensure
that the planning process does not pose a
constraint on the development of housing.

General Fund Housing Division Annually monitor the Affordable Housing Plan.

Staff has monitored
the current processes
and applications
annually and has not
identified any
constraints to the
development of
housing.

Action
H.1.5.3
Together with the developer and nonprofit
partners, including but not limited to, Mercy
Housing, Nations Finest, Bridge Housing,
Sacramento Self Help Housing, Urban Housing
Communities (UHC), and Related California, the
City will use maximum efforts to seek available
resources to support the construction of
affordable housing production for feasible
projects, including, but not limited to, state and
federal housing programs and the City programs
such as the City’s non-residential linkage fee
(Local Housing Trust Fund). The City will also
commit to convening an annual meeting with
affordable housing developers to solicit
information on what is needed from the City to
support affordable housing production in the City
and will collaborate, help, and support
applications for funding to complete projects and
will assist in identifying sites for development in
high resource areas.

State and federal housing
programs and the City programs
such as the City’s non-residential
linkage fee (Local Housing Trust
Fund)
Housing Division
Apply for funding as programs are
available, annually meet
with housing developers, collaborate
on application
support as projects come forward.

The City is currently
working on two
affordable
development projects
with two developers
totalling 110 units. 82
of those units will be
under construction in
2022. The City is
levering local funds by
using its Local
Housing Trust Fund,
City fee incentives,
and the HOME
Consortium to secure
state tax credits.

Page 220 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
8 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Action
H.1.5.4
Amend the Zoning Ordinance to allow and
promote the use of density bonuses to provide
affordable housing consistent with current state
law. The City will encourage developers in high
resource areas to take advantage of the density
bonus and promote affordable housing in these
areas.

General Fund Housing Division
Ongoing, as projects are processed
through the Community Development
Department. Comply with State Law
by July 2022.

The Zoning Ordinance
was amended in 2021.

This Action is
complete.

Policy
H.1.6
Allow housing developments with at least 20 percent affordable housing by right on lower-income housing sites that have been counted in previous housing element cycles, consistent with AB 1397.

Action
H.1.6.1
The City will monitor sites previously counted in
the past two housing elements, specifically sites
A-1, C-1, D-1, and D-2.

General Fund Housing Division
Ongoing, as projects are processed
through the
Community Development
Department.

The sites are being
monitored for housing
development project
applications. No
applications
requesting by-right
approvals were
submitted in 2021.

GOAL
H.2 ENCOURAGE THE IMPROVEMENT, REHABILITATION, AND REVITALIZATION/REINVESTMENT OF THE CITY’S EXISTING RESIDENTIAL NEIGHBORHOODS Policy
H.2.1 Provide neighborhood revitalization in existing areas through housing rehabilitation (owner- and renter-occupied units).

Action
H.2.1.1
The City shall continue to apply for federal and
state funds to fund the City’s housing
rehabilitation program to assist in the
improvement of owner- and renter-occupied
housing units in the City. The City will market the
program in the R/ECAP north of Folsom
Boulevard and areas of concentrated poverty to
assist residents with the cost of repairs and thus
reduce risk of displacement due to costs or
housing condition.

Community Development Block
Grant (CDBG), or other funds (as
funding becomes available to the
City)
Housing Division,
Neighborhood
Services Division
and Economic
Development
Department
Apply for funding as Notices of
Funding Available (NOFAs) are
released. Publicize available funding
on the City’s website as it becomes
available.

During the previous
Housing Element
Cycle, the City made a
total of 12 loans
through its CalHOMEfunded home
rehabilitation program.

These loans provided
funds to low-income
homeowners in need
of health and safety

Page 221 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
9 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
repairs. The City will
reinvest program
income from this
program during the
current Housing
Element Cycle and
look into applying for
additional CalHOME
funding in future
funding cycles. About
30 single-family homes
are rehabilitated each
year through the City’s
CDBG and other grant
programs.

In addition, the City
has strongly
encouraged rental
housing owners and
managers to re-invest
and upgrade rental
housing stock through
the Rental Housing
Inspection Program.

Action
H.2.1.2
Continue the use of the City’s Emergency Repair
Program to provide health and safety repairs for
households falling in the extremely low- , very
low-, and low-income ranges. This is a grant for
mobile home owners and single family
homeowners to address immediate health and
safety problems.

Community Development Block
Grant (CDBG), or other funds (as
funding becomes available to the
City)
Housing Division,
Neighborhood
Services Division
and Economic
Development
Department
The City will provide loans as funding
becomes available each year.

The Emergency
Repair Program,
funded in part by the
City’s CDBG
allocation, funded 12
home repairs during
2021. These grants
funded roof repairs
and other emergency
health and safety
repairs for extremely
low-, very low-, and
low-income owners of
single-family and
mobile homes.

Page 222 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
10 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Action
H.2.1.3
Support churches and service clubs who
organize semi-annual community improvement
days by providing information about the event at
City Hall and on the City’s website. Continue to
make information available to the community
about other revitalization programs including but
not limited to Blight Busters, the Neighborhood
Improvement Program, SMUD, and the
Sacramento Tree Foundation with targeted
marketing in areas of concentrated rehabilitation
need and poverty to assist residents with the
costs of repairs and reduce displacement risk.

Community Development Block
Grant (CDBG), or other funds (as
funding becomes available to the
City)
Housing Division,
Neighborhood
Services Division
and Economic
Development
Department
Ongoing, as community improvement
days occur and new programs
become available.

Many of the activities
planned in 2021 were
cancelled due to the
pandemic. Below are
the 2019 events:

The City’s Volunteer
Program worked with
local businesses and
residents to provide
residential
improvement and
revitalization programs
to impacted
neighborhoods. The
City’s neighborhood
volunteer program
repaired the exterior of
10 homes during the
last planning cycle.

The City’s Volunteer
Program organized
residential
improvement and
revitalization, such as
Re-build Day, Blight
Busters, and other
clean-up and
beautification projects.

These projects
engaged volunteers
from local businesses,
residents, and church
organizations. Over
2,500 trees have been
planted in the City
since 2016 in
partnership with the
Sacramento Tree
Foundation, of which
80 percent have been

Page 223 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
11 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
in disadvantaged
communities.

Action
H.2.1.4
Continue to implement the Crime Prevention
Through Environmental Design (CPTED)
standards through the design review process.

General Fund
Planning and
Building
Departments
Implemented as part of the project
processing and review of individual
development applications.

The Planning
Department has
continuously used
CPTED standards as
part of the design
review process for new
entitlements and has
applied these safety
design standards to
numerous use permits
and design review
applications at both
staff-level review and
projects that went
before the City Council
for approval.

Additionally, the City
continues to consult
with the City’s police
department for further
CPTED and other
safety standards.

Policy
H.2.2 Continue to implement the Folsom Boulevard Specific Plan.

Page 224 of 1447 ends

ITEM 9.7. ATTACHMENT 3
2021 Housing Element Annual Report
12 | P a g e
Housing Element 2021 Annual Report
Description Funding Source: Responsible
Agency: Time Frame: Status/Steps Taken
Action
H.2.2.1
Continue to identify and implement opportunities
on Folsom Boulevard for revitalization that will
improve the Folsom Boulevard corridor,
especially targeting the following:
- Underutilized, blighted, and/or vacant shopping
centers on Folsom Boulevard to increase mixeduse and reuse in that corridor - Land banking where and when opportunities
arise
- Continue to reach out to private property
owners to encourage a sale or development of
their properties
- Communicate with special districts on barriers
they add to development in Rancho Cordova,
through design guidelines or impact fees charged
- Pursue grant funding where available to
address environmental issues
General Fund
Housing Division,
Neighborhood
Services Division,
and Economic
Development
Department
Scanning for opportunities and
communicating with
private property owners is ongoing.

Discussions with
special districts and agencies to be
completed by the end
of 2023.

The City continuously
worked with both
property owners and
developers along
Folsom Blvd. to
identify development
opportunities. The City
has encouraged
private owners to
make frontage and
landscape
improvements along
the boulevard.

Additionally, one
multifamily affordable
housing project was
approved on Folsom
Blvd in 2021.

However, the builder
did not receive grant
funding, but applies
every year.

Other actions the city
is taking or has taken
are as follows: •
 invested $35
million to
repave, add
sidewalks,
and beautify
Folsom Blvd.
•
 acquired
substandard
buildings and
properties
and
demolished
blight on at
least five
sites. •

Page 225 of 1447 ends
← All documents from this meeting