F. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS - HATCHES
A. Hatches:

1. General
a. Hatches shall be as indicated and required in the drawings. 1) Full welded corner joints; insulated hatch lids and integral support curbs; complete with integral counterflashings to roof flashing system and flanges on support curbs for anchorage to roof deck.
b. Hatch Opening hardware: Manufacturer's standard manually operating type capable of ensuring effortless control and smooth operation without causing damage to hatch and roofing system; capable of being opened from inside and outside; complete with holdopen mechanism and padlock hasp(s).

2. Hatches:
a. ROOF HATCH AT FIXED WALL MOUNTED LADDERS.
1) Manufacturer: Bilco
2) Type: Roof Access Hatch & Curb
3) Size: 2'-6" x 3'-0"
4) Model:
a) Type S-20
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ROOF HATCHES AND SAFETY RAILINGS 07 72 33 - 5
i. Frame & Cap Flashing:
a. 14 gauge G-90 paint bond galvanized Steel
b. Fully welded corners
ii. Cover:
a. 14 gauge G-90 paint bond galvanized Steel
b. 3” beaded, overlapping flange
c. Fully welded corners
d. Internally reinforced for 40 psf live load
iii. Cover Liner: 14 gauge P.B. Steel
iv. Cover insulation: 1” Fiberglass
v. Finish: Custom color as selected by the Architect
5) Curb:
a) 6” min. high with integral capflashing
b) 1” fiberboard insulation
c) Fully welded corners
d) 3-1/2” mounting flange with 7/16” holes provided for securing frame to the roof deck
6) Gasket:
a) Extruded EPDM rubber gasket permanently adhered to cover 7) Hinges:
a) Heavy duty pintle hinges with 3/8” Type 316 stainless steel hinge pins 8) Latch:
a) Slam Latch with interior and exterior turn handles and padlock hasps 9) Lift Assistance:
a) Compression spring operators enclosed in telescopic tubes. Automatic hold-open arm with grip handle release.
10) Finish:
a) Steel: Galvanized
11) Hardware:
a) Steel: All hardware is zinc plated/chromate sealed
12) Safety post: None
a) See safety railing system as herein specified

2.3 MATERIALS - SAFETY RAILINGS
A. Roof Hatch Safety Railing:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ROOF HATCHES AND SAFETY RAILINGS 07 72 33 - 6

1. RAILING.
a. Manufacturer: KeeHatch, Kee Industrial Products, Inc. b. Size: Size to fit hatch
c. Model:
1) Exit Forward:
a) Hatch hinges at back of railing system directly behind railing gate opening d. Compliance: OSHA Standard CFR 29 1910.23 and CFR 29 1910.27(c)(7) or most current 1) Loading: 200lbs
e. Materials:
1) Flat Bar: A36 mild steel
2) Pipe: 1-1/4” ID A53 Grade B seamed steel
3) Weld Filler: Metal NR211 e70XX (AWS)
4) Gate: Self Closing
5) Pipe Caps: Weather and light resistant vinyl 1-1/2” deep and to fit snugly over pipe ends
6) Finish: Galvanized – hot dipped
7) Bolts and Washers: Hex head bolts 3/8” x 2 ½” grade Z, zinc plated. Fender washers for inside of hatch curb and standard flat washers outside 8) Railing: KeeKlamp fittings for pipe
f. Installation: Install per manufacturers instructions.

2.4 FABRICATION
A. Fabricated roof hatches and curbs watertight, and free of visual distortions and defects.

B. Safety railing secured to curb.

PART 3 - EXECUTION

3.1 INSPECTION/EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ROOF HATCHES AND SAFETY RAILINGS 07 72 33 - 7

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 INSTALLATION
A. Install roof hatches, Safety Railings and curbs in accordance with manufacturer's recommendations.

1. Coordinate with installation of roofing system and related flashings.

2. Provide weather-tight installation.

3. Adjust opening hardware for proper operation.

4. Coordinate with Access Ladder work.

B. Apply paint on primed steel surface of roof hatch; refer to Section 09 90 00.

1. Paint Color as selected by Architect.

3.5 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.6 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ROOF HATCHES AND SAFETY RAILINGS 07 72 33 - 8

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 07 72 33
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 1
SECTION 07 84 00 - FIRESTOPPING
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Verify applicable dimensions at the jobsite.

C. Furnish materials and perform labor required per this specification to execute this work as indicated on the drawings, as specified, as required by local and state codes and regulations and as necessary to complete the work and fireproofing including the following but not limited to:

1. Through penetration, edge treatment and other firestop and smoke stop treatment for all firerated walls, floors and roofs, including, but not limited to:
a. HVAC duct penetrations
b. Pipe penetrations
c. Conduit penetrations
d. Structural member penetrations
e. Slab edge
f. Roof edge

2. Edge bonding and core material for fire-resistant/fire rated door and window assemblies.

3. Bottom of wall fire stopping and top of wall firestopping a. Fire stopping at fire rated walls
b. Construction joint firestops within walls, or the intersection of top of walls to structure

4. Duct wrap assembly

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC), www.bsc.ca.gov current edition at time of permit issuance.

1. Including, but not limited to;
a. CBC Chapter 7 including but not limited to;
1) Wall penetrations Section 712 and its sub sections
2) Fire resistive Joint Systems Section 713 and its sub sections 3) Opening Protectives Section 715 and its sub sections 4) Ducts and Air Transfer Openings Section 716 and its sub sections 5) Concealed spaces Section 717 and its sub sections
6) Thermal and Sound-insulating Materials Section 719 and its sub sections 7) Prescriptive Fire Resistance Section 720 and its sub sections 8) Calculated Fire Resistance Section 721 and its sub sections City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 2
B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Society For Testing and Materials (ASTM), www.astm.org

1. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Bldg Materials

2. ASTM E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops

3. ASTM E119 - Standard Test Method for Fire Tests of Building Construction Materials

4. ASTM E1399 - Standard Test Method for Cyclic Movement and Measuring of Joint Systems

5. ASTM E1725 - Standard Test Methods for Fire Tests of Fire-Resistive Barrier Systems Electrical Systems Components

6. ASTM E1966 - Standard Test Methods for Fire Tests of Joints

7. ASTM E2307 - Standard Test Method for Determining Fire Resistance of Perimeter Fire Barrier Systems Using Intermediate-Scale Multi-Story Test Apparatus E. International Fire Council guidelines for evaluating Firestop Systems Engineering judgments.

F. National Fire Protection Agency (NFPA), www.nfpa.org

1. NFPA 80 Standard Fire Door and Window Assembly Tolerances

2. NFPA 252 Standard Fire Test for Fire Rated Doors (not specified for positive or Negative furnace test pressure)

3. NFPA 257 Standard Fire Test for Fire Rated Windows (not specified for positive or negative furnace test pressure)

4. NFPA 101 Life Safety Code

5. NEC 70 National Electrical Code
G. Underwriters Laboratory (UL), www.ul.com

1. UL 723 - Surface Burning Characteristics of Building Materials

2. UL 1479 - Fire Tests of Through-Penetration Firestops, including optional air leak test

3. UL 2079 - Fire Tests of Building Joint Firestop Systems

4. UL Fire Resistance Directory (Component Listing Test Criteria) a. HW designs: Volume 2A

5. F – Ratings, UL designs: ASTM E 814 & UL 1479

6. T – Ratings, UL designs: ASTM E 814 & UL 1479

7. L - Ratings, UL designs: ASTM E 814 & UL 1479

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 3
Item Name of Test Performance Testing Std.

F-Rated
Systems: (fire)
Provide firestop systems with F-ratings
indicated, but not less than that equaling or
exceeding fire-resistance ratings of the
construction assemblies listed.

ASTM E814
T-Rated
Systems:
(temperature)
Provide firestop systems with T-ratings
indicated, where systems protected
penetrating items exposed to potential
contact with adjacent materials in
occupiable floor areas.

ASTM E814 and
ASTM E119,
L-Rated Systems Provide firestop systems with L-ratings indicated, where systems maintain a barrier
to cold smoke at all: penetrations,
connections with other surfaces,
separations required to permit building
movement, sound or vibration absorption,
and other construction gaps
UL2079,ASTM
EB99 and ASTM
E814,
Flame Spread 25 or less
Firestopping
design
A.

Smoke
developed
450 or less
ASTM E84
Construction
joint/gap
systems
cyclic movement meet or exceed 500 cycles at 10 cycles per minute.

UL 2079 and
ASTM E1399
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

D. Construction Testing / Inspection by others:

Item Name of Test Performance Results By Whom
Firestopping
systems and
assemblies
Design
compliance
Comply Special Inspector
Inspection service as approved by
agency having jurisdiction
Cost for independent inspections shall be borne by General Contractor E. Construction Monitoring/Observations by others:

Item Name of Test Performance Results By Whom
Firestopping systems and
assemblies
Const. Waste
Management
Comply Refer to Division
1 for construction
waste
management and
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 4
disposal/recycling
requirements

1.4 SUBMITTALS AND MOCK-UPS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified
C. Refer to Division 1 for sustainability requirements Submit Manufacturer’s data and shop drawings.

1. Manufacturer’s product literature for each type of firestop material as follows:
a. Product characteristics, typical uses, installation procedures, performance and limitation criteria
b. Material Safety Data Sheets (MSDS)
c. Firestop system products bear classification marking of qualified testing and inspecting agency
d. Firestop systems correspond to those indicated by reference to firestop system designations listed in these specifications and/or in the drawings by the following:
1) Assembly type
2) UL in “Fire Resistance Directory”
3) ITS (Warnock Hersey) in “Directory of Listed Products” 4) Omega Point Laboratories
5) Factory Mutual
e. Local and State regulatory requirements: Submit forms of acceptance for proposed assemblies not conforming to specific UL Firestop System numbers or UL classified devices.

2. Submit manufacturer's installation procedure for each type of product. a. For each firestop system show construction conditions, relationships to adjoining construction, dimensions, description of materials and finishes, component connections, anchorage methods, hardware and installation procedures, plus the following:
1) Firestop design designation of testing and inspecting agency acceptable to authorities having jurisdiction that confirms compliance with requirements for each condition indicated.
b. Documentation, including illustrations, from a qualified testing and inspection agency that is applicable to each firestop system configuration for construction and penetrating items.

Factory 2nd/ or manufacturer furnished installation details are not acceptable in lieu of published documents by approved testing agencies (UL, OPL, Warnok Hersey, etc). c. Where Project conditions require modification of a qualified testing and inspecting agency’s illustration to suit a particular firestop condition, submit illustration, with modifications marked, approved by firestop system manufacturer’s fire-protection engineer.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 5
d. Submit manufacturer's drawings for all non - standard applications where no UL tested system exists. All drawings must indicate the “Tested" UL system upon which the judgment is based so as to asess the relevance of the judgment to some known performance. e. Engineering judgment drawings must follow requirements set forth by the International Firestop Council.

3. List of 3M supplied assembly Identification labels
D. Submit samples.

1. Coordinate with Inspector
E. Site mock-up, refer to “Mock-Up” heading.

F. Certification:

1. For firms and persons specified in “Quality Assurance” Section to demonstrate their capabilities and experience, include a list of names and addresses of completed projects, Architects and Owners and other information specified.

2. Product Certificates: Signed by manufacturers of firestop system products certifying that products furnished, comply with requirements.

3. Product Test Reports: From a qualified testing agency indicating that firestop system complies with requirements, based on comprehensive testing of current products.

4. Engineering Judgments: Submit manufacturer’s drawings for all non-standard applications where no UL tested system exists. All drawings must indicate the “Tested” UL system upon which the judgment is based so as to assess the relevance of the judgment to some known performance.

5. Approved Applicator: Submit document from manufacturer wherein manufacturer recognizes the installer as qualified or submit a list of past projects to demonstrate capability to perform intended work.

6. Certification upon completion, installer shall provide written certification that materials were installed in accordance with the manufacture's installation instructions and details.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing / installing / finishing projects of similar size and complexity.

C. Manufacturer shall have been in business for five (5) years providing/installing/finishing projects of similar size and complexity.

D. Stipulations:

1. Firestopping systems (materials & design):
a. Shall conform to both Flame (F) and Temperature (T) ratings as required by local building codes and as tested by nationally accepted test agencies per ASTM E814 or UL 1479 fire tests in a configuration that is representative of field conditions. The (F) rating must be a minimum of one (1) hour but not less than the fire rating of the assembly being penetrated.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 6
b. Shall conform to assembly rating per UL2079
c. Firestopping materials shall be asbestos and lead free and shall not incorporate nor require the use of hazardous solvents.
d. Firestopping materials shall not shrink upon drying as evidenced by cracking or pulling back from contact surfaces.
e. Firestopping materials shall be moisture resistant, and shall not dissolve in water after curing.
f. Provide firestop systems that are produced and installed to resist the spread of fire according to requirements indicated, resist passage of water, smoke and other gasses, and maintain original fire-resistance rating of constructed assembly.

2. Fire Protection Installer’s Qualifications: Engage an experienced installer, (including individual traded people such as: electrical, mechanical, insulators, etc.) who is qualified by having the necessary experience, staff, and training to install manufacturer’s products per specified requirements, plus the following:
a. Acceptable to or licensed by manufacturer, state or local authority b. Established a record of successful in-service experience with firestop systems or completion of manufacturer’s certified product installation training. c. Installation of firestopping systems shall be performed by a contractor (or contractors) trained or approved by the firestop manufacturer.
d. Submit document from manufacturer wherein manufacturer recognizes the installer as qualified or submit a list of past projects to demonstrate capability to perform intended work.

3. Source Limitations:
a. Obtain firestop systems for each kind of penetration and construction condition indicated, from a single manufacturer.

4. Fire-Test-Response Characteristics: Provide firestop systems that comply with the following requirements and those specified in “Performance Requirements”. a. Firestopping tests and follow-up inspection services for firestop systems are performed by qualified testing and inspection agency acceptable to authorities having jurisdiction. b. Firestop systems are identical to those tested as herein listed and comply with the appropriate requirements:
c. Firestop system products shall bear classification marking of a qualified testing and inspecting agency
1) Firestop systems correspond to those indicated by reference to firestop system designations listed by the following:
a) UL in “Fire Resistance Directory”
b) ITS (Warnock Hersey) in “Directory of Listed Products” c) Omega Point Laboratories
d) Factory Mutual
d. Local and State regulatory requirements: Submit forms of acceptance for proposed assemblies not conforming to specific UL Firestop System numbers or UL classified devices.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 7
E. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work. Agenda for meeting shall include, but not be limited to;

1. All locations to receive protection assemblies and/or treatment

2. Assemblies that have been altered from design

3. Inspection schedule General Contractor shall request meeting 5 days in advance of construction.

F. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures.

1. Manufacturer’s representative shall review and certify in writing all phases of construction to verify the complete work meets specification requirements.

2. Written certification of all phases of construction shall be sent to the Architect by the manufacturer’s representative.

G. Miscellaneous criteria:

1. For firestop systems exposed to view, traffic, moisture, sunlight and physical damage, provide products that after curing do not deteriorate when exposed to these conditions both during and after construction. Firestopping materials shall not shrink upon drying as evidenced by cracking or pulling back from contact surfaces.

2. Firestopping materials shall be asbestos and lead free and shall not incorporate nor require the use of hazardous solvents.

3. Firestopping materials shall not shrink upon drying as evidenced by cracking or pulling back from contact surfaces.

4. Firestopping materials shall be moisture resistant, and shall not dissolve in water after curing.

5. Installation of firestopping systems shall be performed by a contractor (or contractors) trained or approved by the firestop manufacturer.

6. All top of wall conditions, penetrations, etc. will need to be installed to withstand vertical and lateral movement.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver firestop system products to project site in original, unopened containers or packages with intact and legible manufacturer’s labels identifying product and manufacturer, date of manufacture, lot number, shelf life, qualified testing and inspection agency’s classification marking, curing time, and mixing instructions.

C. Store and handle materials for firestop systems to prevent their deterioration or damage according to manufacturer’s instructions.

D. All firestop materials shall be installed prior to expiration of shelf life.

E. Comply with recommended procedures, precautions or remedies described in material safety data sheets as applicable.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 8

1.7 JOB CONDITIONS
A. Existing Conditions:

1. Verify the condition of the substrates and correct unsatisfactory conditions before installing firestop system products; follow manufacturer’s instructions.

B. Environmental Limitations:

1. Comply with manufacturer’s recommendations for temperature and humidity conditions before, during and after installation of firestop systems.

C. Ventilation:

1. Ventilate firestop systems during installation per manufacturer’s written instructions by natural means or, where this is inadequate, forced-air circulation.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

1. Provide masking and drop clothes to prevent contamination of surfaces by firestop system materials.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

D. Provide masking and drop clothes to prevent contamination of surfaces by firestop system materials.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to the following:

1. Wall construction

2. Roof construction
B. Related sections include, but are not limited to the following:

1. Division 1

2. Section 03 30 00 - Cast-in-Place Concrete

3. Section 04 22 00 – Concrete Unit Masonry
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 9

4. Section 05 40 00 – Cold Formed Metal Framing

5. Section 06 10 00 – Rough Carpentry

6. Section 07 21 00 – Building Insulation

7. Section 07 92 00 – Sealants and Caulking

8. Section 08 11 13 – Steel Doors & Frames

9. Section 08 11 16 – Interior Aluminum Doors and Frames

10. Section 08 41 00 – Entrances, Window Walls, Storefront System and Curtain Walls

11. Section 09 22 16 – Non-Structural Metal Framing

12. Section 09 29 00 - Gypsum Board and Sheathing Substrates

13. Divisions 21 through 28

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

1.13 GENERAL SYSTEM DESCRIPTION
A. This Section Includes, but not limited to these as typical conditions and installations;

1. Firestop systems for through-penetrations of the following fire-resistance-rated assemblies, including both empty openings and openings containing penetration items:
a. Walls and partitions
b. Smoke barriers
c. Construction enclosed compartmentalized areas.

2. Firestop systems for construction joints/gaps occurring between the following fire-resistance rated assemblies:
a. Walls and the intersection of the top of walls to structure b. Smoke barriers

3. Firestop systems for containment of fire, heat and smoke for pipes and conduits passing through the following fire-resistance-rated areas:
a. Occupied rooms and storage spaces
b. Mechanical/electrical rooms, shafts and closets
c. Construction enclosed compartmentalized areas:

4. Firestop systems for composition edge banding and care materials for fire-resistance-rated door/window styles and rails to seal joints and gaps, helping to retain fire-resistant components within their frames and retard the spread of flames, smoke and hot gases.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 10
a. Fire-resistance-rated door and window assemblies to comply with UBC7-2-1997 (“positive pressure” requirements).
b. Special limitations apply to the entire fire-resistance-rated door/window assembly being specified for “positive pressure” (assembly includes the door/window, frame and hardware).

1.14 DEFINITIONS
A. Including the following, but not limited to:

1. Assembly: Particular arrangement of materials specific to a given type of construction defined in referenced documents.

2. Barrier: Any bearing or non-bearing floor, wall, or ceiling assembly that has an hourly fire or smoke rating.

3. Construction Gap: Any joint or opening, whether static or dynamic, within or between adjacent sections of interior or exterior walls, floors, ceilings or roof decks.

4. Engineering judgment: Evaluations that are developed by a manufacturer for a new firestop system that complies with similar UL approved designs or tests that are acceptable to the code enforcing authorities.

5. Drawings: Must follow requirements set forth by the International Firestop Council, most current edition.

6. Firestopping: Methods and materials applied in penetrations and unprotected openings to limit the spread of heat, fire, gasses, water and smoke.

7. Firestop Systems: The use of a specific firestop material or combination of materials in conjunction with a specific wall, floor, or ceiling construction type and a specific penetrating material(s) to achieve a rated fire barrier.

8. Intumescent: Materials that expand with heat to seal around objects threatened by fire.

9. Penetration: Opening or foreign material(s) is breached either in total or in part. Any item passing completely through a wall or floor.

10. Sleeve: Metal fabrication or pipe section that is part of a system that extends through a barrier.

11. Annular Space: The distance between a penetrating item and the surrounding opening.

12. Percent Fill: The cross-sectional area of an opening that is occupied by a penetrating item.

1.15 TESTING AGENT
A. Refer to Division 1 for Testing Laboratory service requirements.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer.

B. Acceptable manufacturer’s fabricator shall be one of the following and as herein listed and in Drawings:

1. 3M Fire Protection Products/Dow Corning, St. Paul, MN www.3m.com

2. Hilti, Inc., Tulsa, OK (800) 879-8000 www.us.hilti.com City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 11

3. Specified Technologies Inc. / GE Pensil (STI), Somerville, NJ 08876, (800) 992–1180 www.stifierstop.com

4. Passive Fire Protection Partners (PFPP), www.firestop.com

5. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIAL
A. General

1. Firestopping materials and systems shall meet the requirements specified herein.

2. Conditions are typical for all project conditions regardless if specifically noted or not.

3. All firestop products and systems shall be designed and installed so that the basic sealing system will allow the full restoration of the thermal and fire resistance properties of the barrier being penetrated with minimal repair if penetrations are subsequently removed.

4. Owner must approve in writing any alternates to the firestop systems and materials specified herein.

5. Compatibility: Provide firestop systems that are compatible with one another, with the substrates forming openings, and with the items, if any, penetrating through the firestop system, under conditions of service and application, as demonstrated by the firestop system manufacturer based on testing and field experience.

6. Accessories: Provide components for each firestop system that is needed to install fill materials and to comply with “Performance Requirements”. Use only components specified by firestop systems manufacturer and approved by the qualified testing and inspecting agency for firestop systems indicated. Accessories include, but are not limited to, the following items:
a. Permanent forming/damming/backing materials, including the following:
1) Slag/rock-wool-fiber insulation
2) Sealant used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state
3) Fire-rated form board
4) Fillers for sealant
b. Temporary forming materials
c. Substrate primers
d. Collars and steel sleeves
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 12

2.3 MATERIAL - THROUGH-PENETRATION FIRESTOP SYSTEMS
A. Systems or devices listed in the UL Fire Resistance Directory under categories XHCR (firestop devices) and XHEZ (firestop systems) may be used, providing that they conform to the separate instance, and that the system symmetrical for wall applications.

B. Additional requirements: Withstand the passage of cold smoke either as an inherent property of the system, or by the use of a separate product included as a part of the UL system or devise, and designed to perform this function.

C. All through-penetration firestop system products must be from a single manufacturer.

1. All trades will use products from the same manufacturer.

D. Acceptable products: Those listed in the UL Fire Resistance Directory for the UL System involved and defined in the attached Systems and Applications Schedule or approved equal.

E. Design Schedule:

1. 1 & 2 Hour walls:
a. Pipe penetrations - metallic
1) Size: 12” dia or smaller
2) Material:
a) Schedule 10 or heavier
b) Service weight or heavier cast iron soil pipe
c) Class 50 or heavier ductile iron pressure pipe
3) Design Number: W-L-1001
4) Mfgr: 3M
5) Product: CP 25WB+
b. Conduit penetrations – metallic
1) Size: 6” dia. or smaller
2) Material:
a) Steel conduit
b) Type L or heavier copper tubing
3) Design Number: W-L-1001
4) Mfgr: 3M
5) Product: CP 25WB+
c. Conduit penetrations – metallic
1) Size: 4” dia. or smaller
2) Material:
a) Steel electrical metallic tubing
3) Design Number: W-L-1001
4) Mfgr: 3M
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 13
5) Product: CP 25WB+
d. Conduit penetrations – metallic
1) Size: 1” dia. or smaller
2) Material:
a) Flexible steel conduit
3) Design Number: W-L-1001
4) Mfgr: 3M
5) Product: CP 25WB+
e. Pipe penetrations – non metallic
1) Size: 6” dia. or smaller
2) Material:
a) Schedule 40 PVC pipe
b) solid- core polyvinyl chloride
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
f. Pipe penetrations – non metallic
1) Size: 4” dia. or smaller
2) Material:
a) Schedule 40 PVC pipe
b) Cellular core polyvinyl chloride
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
g. Pipe penetrations – non metallic
1) Size: 4” dia. or smaller
2) Material:
a) Schedule 40 ABS pipe
b) Solid core acrytonitrile-butadiene-styrene (ABS)
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
h. Pipe penetrations – non metallic
1) Size: 4” dia. or smaller
2) Material:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 14
a) Schedule 40 ABS pipe
b) Fire retardant polypropylene (FRPP)
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
i. Conduit penetrations – non metallic
1) Size: 4” dia. or smaller
2) Material:
a) Rigid non-metallic conduit formed of PVC
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
j. Tubing penetrations – non metallic
1) Size: 1” dia. or smaller
2) Material:
a) Electrical non-metallic tubing formed of PVC
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
k. Pipe penetrations – non metallic
1) Size: 6” dia. or smaller
2) Material:
a) Schedule 40 CPVC
b) Chlorinated polyvinyl chloride pipe (CPVC)
3) Design Number: W-L-2002
4) Mfgr: 3M
5) Product: FS – 195+, PPDs
l. Duct penetrations –metallic
1) Refer to mechanical documents and details for Fire/Smoke damper at this location. m. Cable Tray penetrations –metallic
1) General:
a) Refer to pipe penetrations and electrical drawings.
b) Cable trays stop short of wall below access floor and continue thru wall via pipes. 2) Design No.:
3) Mfgr: 3M
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 15
4) Product:
n. Top of wall
1) Design Number:
a) Wall design: Gypsum Association, GA File No. ASW 1100 b) Top of Wall: As herein specified
o. Bottom of wall
1) Design Number:
a) Wall design: Gypsum Association, GA File No. ASW 1100 b) Bottom of Wall: Fire caulk between floor deck and gypsum board edge, refer to documents and details.
p. Wall Box protection
1) Size: 4” x4” max.
2) Material: Steel box
3) Design Number: CLIV
4) Mfgr: 3M
5) Product: Fire Putty

2.4 MATERIAL - CONSTRUCTION JOINT/GAP FIRESTOP SYSTEMS FOR FIRE-RATED ASSEMBLIES A. General:

1. Fill, void or cavity materials listed in the UL Fire Resistance Directory under category XHHW may be used, providing it conforms to the construction type and fire rating involved in each separate instance.

2. Forming materials listed in the UL Fire Resistance Directory under category XHKU may be used, providing it conforms to the construction type and fire rating involved in each separate instance and meets UL 2079, ASTM E1966 and ASTM E2307.

3. Additional requirements: Withstand the passage of cold smoke either as an inherent property of the system, or by the use of a separate product included as a part of the UL system or devise, and designed to perform this function.

4. All construction joint/gap firestop system products must be from a single manufacturer. All trades will use products from the same manufacturer.

5. Acceptable products: Those listed in the UL Fire Resistance Directory for the UL System involved and defined in the attached Systems and Applications Schedule or approved equal.

B. Schedule of Top of Wall and Bottom of Wall, refer to heading 2.3.

2.5 MATERIAL - COMPOSITION EDGE BANDING AND CORE MATERIAL FIRESTOP SYSTEMS FOR FIRERESISTANT- FIRE-RATED DOORS/WINDOWS A. General:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 16

1. Fire-resistive rated door and window fire seal material listed and tested in compliance with UBC 7-2 (positive pressure), and UL 10C standards.

2. Additional requirements: withstand the passage of cold smoke either as an inherent property of the system, or by the use of a separate product included as a part of the UL system or devise, and designed to perform this function.

3. All composition edge banding and core material firestop system products must be from a single manufacturer. All trades will use products from the same manufacturer.

4. Acceptable products: Those listed in the UL Fire Resistance Directory for the UL system involved and defined in the material schedule below:

B. Schedule:

1. Fire resistive seal
a. 3M Graphite Intumescent Seal (GIS), 1/16” thick by ½” wide, flexible, adhesive backed, fiber/latex mat, containing highly expandable graphite. 1) Form: Supplied in roll form with adhesive backing and release liner

2. Color: Gray, black, dark brown as selected by Architect

3. Mfgr: 3M

2.6 MATERIAL - FIRESTOP SYSTEMS FOR ELECTRICAL POWER/LOW VOLTAGE PASSING THOUGH FIRERESISTANT-RATED WALLS.

A. General:

1. Electrical systems protection material listed in UL-classified systems UL-classified systems UL 1709, ASTM E119, ASTM E1529 and ASTM E1725.

2. All electrical firestop system products must be from a single manufacturer. a. All trades will use products from the same manufacturer.

3. Acceptable products: Those listed in the UL Fire Resistance Directory for the UL System involved and defined in the material schedule below:
1) Fire resistive mats: 3M Interam Endothermic Mats, .3” or .4” thick, 24.5” or 49” wide x 16’. 20’, or 25; long rolls, foil encapsulated with 3M logo 2) Smoke and Flame Sealant: 3M FireDam 150 Caulk or Hilti FS-One Firestop sealant 3) Foil tape: 3M Interam T-49 Aluminum Foil Tape – used as a vapor barrier, radiant heat reflector, and installation aid
4) General Purpose Tape: Scotch 898 Filament Tape – used as installation aid 5) Composite Sheet: 3M Fire Barrier CS-195+ Composite Sheet – used to cover openings and as a collar at the termination of the fire protection envelopes 6) Firestoppoing Caulk: 3M Fire Barrier CP 25WB+ Caulk – used as a smoke and flame sealant
7) Firestopping Blocks: Hilti FS675 Fire Blocks
B. Schedule of Wall Penetrations, refer to heading 2.3

2.7 MATERIAL - WALLS SYSTEMS FOR FIRE-RATED ASSEMBLIES
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 17
A. General:

1. Assemblies:
a. Top of Walls
b. Bottom of Walls
c. Construction Joints
d. Construction Gaps
e. Firestopping

2. Forming Material – Mineral Wool Fire Safing materials listed in the UL Fire Resistance Directory which conform to the construction type and fire rating involved in each separate instance. a. Density of material as dictated by UL Design requirements.

3. Forming materials listed in the UL Fire Resistance Directory under category XHKU may be used, providing it conforms to the construction type and fire rating involved in each separate instance and meets UL 2079 and ASTM E1966.

4. Fill, void or cavity Material – Spray applied “Fire Spray” material listed in the UL Fire Resistance Directory which conform to the construction type and fire rating involved in each separate instance and in accordance with listed product and manufacturer.

5. Additional requirements: Withstand the passage of cold smoke either as an inherent property of the system, or by the use of a separate product included as a part of the UL system or devise, and designed to perform this function.

6. Acceptable products: Those listed in the UL Fire Resistance Directory for the UL “HW-D” System involved and defined in the attached Systems and Applications Schedule or approved equal.

B. Schedule:

1. Top of wall
a. Wall design:
1) 1 Hour: Gypsum Association, GA File No. WP 1072
b. Schedule:
1) UL Design: Sealant Mineral Wool: Firespray:
a) HW-D-0024 PFPP, 4100NS, 4800DW, 3600EX None None
b) HW-D-0077 Hilti CP606 None None
c) HW-D-0103 SpecSeal ES None None
d) WH-D-0111 3M FD-150+ None None
e) HW-D-0144 WR Grace FS 900+ None None
f) HW-D-0144 WR Grace FS 1900 None None
g) HW-D-0256 TREMCO TREMstop None None

2. Bottom of Wall
a. Design Number:
b. Wall design:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 18
1) 1 Hour: Gypsum Association, GA File No. WP 1072
2) 2 Hour: Gypsum Association, GA File No. WP 1522
c. Schedule:
1) UL Design:
a) BW-S-0004 – PFPP sealant
b) BW-S-0007 – 3M sealant
2) Sealant/Caulking:
a) Passive Fire Protection Partners (PFPP)
i. 4100NS
ii. 4800DW
iii. 3600EX
b) 3M
i. FB 1000 NS
ii. FB-2000
iii. FB-2000+
iv. FB-3000 WT sealant
v. FireDam 150+
vi. IC 15WB+
vii. CP 25WB+
d. Bottom of Wall: Fire caulk between floor deck and gypsum board edge, refer to documents and details.

2.8 MATERIAL – AIR DUCT WRAP SYSTEM
A. General:

1. Rating: 2-hour fire-resistive rated air duct enclosure materials listed in the UL Fire Resistance Directory under.

2. Product:
a. Mfgr: 3M
1) Hilti is optional mfgr.
b. Materials:
1) Wrap: 615+
2) Tape:
a) Model: 5A
i. High performance filament tape.
ii. Aluminum foil tape: Minimum 3” wide to seal cut blanket edges 3) Banding Material:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 19
a) Carbon steel banding for < 1 – hour ratings; ½” to ¾” wide x 0.015” thick minimum b) 304 Stainless Steel banding for 2-hour ratings; ½” to ¾” wide x 0.015” thick minimum
4) Insulation pins/washers:
a) Pins: 10 gauge, 4” to 5” long, copper coated steel; washers: 1.5” x 1/5” or 1.5” diameter galvanized steel speed clip
5) Through-penetration fire stop materials:
a) Packing material: Scrap pieces, 3M FireMaster Duct Wrap, 1.5” thick or 3 pcf mineral wool
b) 3M FB-2000+ Silicone Sealant
6) Grease duct access door:
a) Single angle opening frame
b) Access cover, minimum 16 gauge
c) Insulation pins
d) Speed clips, minimum 1.5” x 1.5” or 1.5” diameter galvanized steel 7) Hardware:
a) Threaded rods: 4” to 5” long, ¼” diameter galvanized steel with 1/4” wing nuts and 1/4” metal washers
b) 4” long steel hollow tubing to fit threaded rods
c. UPC #: As listed for each product and size
d. Compliance:
1) Testing:
a) ASTM:
i. ASTM C 518
ii. ASTM C 1338
iii. ASTM E 84
iv. ASTM E 119
v. ASTM E 136
vi. ASTM E 814
vii. ASTM E2336 grease duct standards
b) NFPA:
i. NFPA 92A
ii. NFPA 92B
iii. NFPA 96
iv. NFPA 101
v. NFPA 252 (UL 910)
c) ISO: ISO 6944 air duct test standard
d) ICC:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 20
i. ICC ES AC101
ii. ICC-ES, ESR-1255
e) California State Fire Marshall
f) Third party:
i. Air Duct:
a. Intertek:
i). 3MU/FRD 120-15: Rectangular, 24” x85”
ii). 3MU/FRD 120-04: Round, 40” diameter
ii. UL: HNLJ.V-27
2) Surface burning and smoke compliance:
a) Flame Spread: <25 ASTM E 84
b) Smoke developed: <50 ASTM E 84

3. Design:
a. Air Duct:
1) Duct system:
a) Duct type: Testing organization: Design #: Rating:
i. Rect. or round UL V-27 1 or 2 hour
2) Details:
a) General: UL Testing
b) Schedule:
i. Condition: Type Design #: Rating:
a. 2hr.Metal stud wall 85” x 24” max W-L-7180 2hr. – F & T b. Conc./U wall 85” x 24” max W-J-7104 2hr. – F & T
c. 1hr.Floor/Clg. – wd. 48” x 20” max F-C-7054 1hr. – F & T d. 2hr.Metal stud wall 10”dia. stl,sched 10 min W-L-132340 2hr. – F & T e. 2hr.Metal stud wall 10”dia. cast/ductile iron W-L-132340 2hr. – F & T f. 2hr.Metal stud wall 4”nom.dia. max. W-L-132340 2hr. – F &

1.25 hr. T

1. Type L or heavier copper
g. 2hr.Metal stud wall 4”nom.dia. max. LW-L-132340 2hr.F &

1.25 hr. T

1. Regular type or heavier copper

2.9 MATERIALS- SCHEDULE GENERAL
A. General:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 21

1. Comply with design criteria.

B. Schedule:

1. Materials including these and as indicated in specific designs including, but not limited to; a. Intumescent Firestop Sealants and Caulks:
1) 3M Fire Barrier Caulk CP25WB+
2) Hilti FS-One Firestop Sealant
3) STI SpecSeal S100 and S500 Sealant
b. Latex/Acrylic Firestop Sealant: (CP606 is an acrylic based firestop sealant) 1) STI SpecSeal LC150 Sealant
2) Hilti CP606 Flexible Firestop Sealant
c. Silicone Firestop Sealants and Caulks:
1) 3M Fire Barrier Silicone Sealant
2) Hilti CP601S Elastomeric Firestop Sealant
3) STI SpecSeal Pensil 100 and 300
d. Firestop Putty:
1) 3M Fire Barrier Moldable Putty
2) Hilti CP617/CP618 Putty Pads & Putty Stick
3) STI SpecSeal Firestop Putty Bars and Pads
e. Firestop Spray (head of wall joint):
1) Hilti CP 672 Firestop Joint Spray
a) Color: White
b) Paintable: yes
2) STI SpecSeal Elastomeric Acrylic Firestop Spray
f. Firestop Collars:
1) 3M Fire Barrier PPD’s
2) Hilti CP642/643 Firestop Collars
3) STI SpecSeal Firestop Collars
g. Wrap Strips:
1) 3M Fire Barrier FS195 Wrap Strip
2) Hilti CP 645 Firestop Wrap Strip
3) STI SpecSeal Pensil 200
h. 2- Part Silicone Firestop Foam:
1) 3M Fire Barrier 2001 Silicone Foam
2) STI SpecSeal Pensil 200
3) CP 620
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 22
i. 2-Part Polyurethane Firestop Foam
1) Hilti CP 620 Fire Foam
j. Firestop Mortar:
1) STI SpecSeal Mortar
2) Hilti CP 637 Firestop Mortar
k. Composite Board:
1) 3M Barrier Sheet Material
l. Accessories:
1) Forming / Damming Materials: Mineral fiberboard or other type as per manufacturer recommendations.
m. Fire Safing and clip fasteners (Use Weight “pcf” as required by fire rated design) 1) Owens Corning, Safing Insulation, Mineral Wool
n. Hilti, Speed Plugs, CP 772 x 2” and/or CP 777 x 3” (Fire Safing at metal deck flutes)Firestop Blocks/Bags/Pillows
1) Hilti FS657 Fireblock
o. Cast-in-Place Firestop Devices
1) Hilti CP 680 Cast-in-Place Firestop Devices
PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

C. Examine areas and conditions under which firestop system is to be installed and notify the Architect of conditions detrimental to proper or timely completion of the work.

D. Examine substrates to determine they are satisfactory to receive firestop system materials.

1. Conduct tests according to firestop systems manufacturer’s written recommendations to verify that substrates are free of oil, grease, rolling compounds, incompatible primers, loose mill scale, dirt or other foreign substances capable of impairing bond of fire-resistive materials.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 23

2. Verify objects penetrating firestop materials, including clips, hangers, support sleeves, and similar items, are securely attached to substrates.

3. Verify substrates are not obstructed by ducts, piping, equipment, and other suspended construction that will interfere with applying fire-resistive materials.

E. Do not proceed with installation of firestop system until unsatisfactory conditions have been corrected by the General Contractor in a manner acceptable to the Architect.

F. Where necessary, cleaning of surfaces to receive firestopping shall be the responsibility of the General Contractor.

1. Remove incompatible materials, which affect bond.

G. Insure that all clips, hanger supports, and other attachments for items that affect the firestopping material have been placed in their final position.

H. Verify that environmental conditions are safe and suitable for installation of firestop products.

I. Verify that all pipe, conduit, cable, and other items, which penetrate fire - rated construction, have been permanently installed prior to installation of firestops.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

C. Coordinate construction and sizing of sleeves, openings, core-drilled holes, cut openings and penetrating items to ensure that firestop systems are installed according to specified requirements.

D. Notify Owner, inspecting agency, General Contractor, and subcontractor at least seven days in advance of firestop system installations; confirm dates and times on days preceding each series of installations.

E. Do not cover-up or conceal firestop system installations behind other construction until Owner, inspecting agency and building inspector, if required by authorities having jurisdiction, have examined each installation.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

B. Clean and repair substrates that could impair the adhesion or proper fitting of firestop materials, including oil, grease, rolling compounds, incompatible primers, and loose mill scale.

C. Secure all pipes, conduit, cable and other items, which penetrate firestop materials.

D. Provide masking and temporary covering, as required, to prevent contamination of adjacent surfaces by firestop materials.

3.4 CONDITIONS REQUIRING FIRESTOPPING - GENERAL
A. General:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 24

1. Provide and install firestopping for conditions specified whether or not firestopping is indicated, and if indicated, whether such material is designed as insulation, safing, or otherwise.

B. Through - Penetrations:

1. Firestopping shall be installed in all open penetrations and in the annular space in all penetrations in any bearing or non-bearing fire - rated barrier.

C. Construction Joints / Gaps:

1. Firestopping shall be provided and installed:
a. Between the head of walls and the underside of structure above. b. At intersection of rated wall partitions and walls.

D. Smoke - Stopping:

1. As required per ASTM E-814 testing and in accordance with building and fire codes:
a. As required by the other Sections, Smoke - Stops shall be provided for Through - Penetrations, Membrane - Penetrations, Construction Gaps and edge of floor to wall conditions with a material/system approved.

3.5 INSTALLATION
A. General:

1. Installation of firestops shall be performed by an applicator/installer qualified and trained by the manufacturer.

2. Installation shall be performed in strict accordance with manufacturer's detailed instruction procedures.

3. Apply firestops in accordance with fire test reports, fire resistance requirements, acceptable sample installations, and manufacturer's recommendations.

4. Unless specified and approved and retested, all insulation used in conjunction with through - penetrations shall remain intact and undamaged and may not be removed.

5. In high traffic, protect firestopping materials from damage. a. If the opening is large, install firestopping materials capable of supporting the weight of a human.

6. All combustible penetrates (e.g. non - metallic pipes) shall be firestopped using products and systems tested in a configuration representative of the field conditions.

B. Dam Construction:

1. When required to properly contain firestopping materials within openings, damming or packing materials may be utilized.
a. U.L. approved combustible backer rod material may be used when part of tested assembly. b. Noncombustible damming materials may be left as permanent component of the firestop system.

C. Extend firestop material in full thickness over entire area of each substrate or opening to be protected.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 25
D. Protect firestop material from damage on surfaces subject to traffic/construction.

E. Consult with mechanical engineer, project manager and damper manufacturer prior to installation of UL Firestop systems that might hamper the performance of fire dampers as it pertains to duct work.

3.6 INSTALLATION -THROUGH-PENETRATION FIRESTOP SYSTEMS
A. General:

1. Install through-penetration firestop systems to comply with “Performance Requirements” and firestop systems manufacturer’s written installation instructions and published drawings for products and applications indicated. (See “Through-penetration Firestop Systems Schedule”)

2. Install forming/damming/backing materials and other accessories or types required to support fill material during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated. a. After installing fill materials, remove combustible forming materials and other accessories not indicated as permanent components of firestop system.

3. Install fill materials for firestop systems by proven techniques to produce the following results:
a. Fill voids and cavities formed by openings, forming materials, accessories and penetrating items as required to achieve fire-resistance ratings indicated. b. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.
c. For fill materials that will remain exposed after completing work, finish to produce smooth, uniform surfaces that are flush with adjoining surfaces.

B. Field Quality Control

1. Proceed with inclosing through-penetration firestop systems with other construction only after inspection and approval by code authorities.

2. Where deficiencies are found, repair or replace through-penetration firestop systems so they comply with requirements.

3. Inspection Agency: If required, Owner will engage a qualified independent inspecting agency to inspect through-penetration firestop systems comply with or deviate from requirements.

C. Identification

1. Typical:
a. Type: Identify through-penetration firestop systems with pressure-sensitive, selfadhesive, preprinted vinyl labels. b. Installation: Attach labels permanently to surfaces of penetrated construction on both sides of each firestop system installation where labels will be visible to anyone seeking to remove penetrating items or firestop systems.
c. Supplied by: Label shall be as supplied by 3M
d. Exposed conditions shall be coordinated with Architect and Owner for application.

D. Cleaning and Protection
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 26

1. Clean off excess fill materials adjacent to openings as work progresses by methods and with cleaning materials that are approved in writing by through-penetration firestop systems manufacturer and that do not damage materials in which openings occur.

2. Provide final protection and maintain conditions during and after installation that ensure through-penetration firestop systems are without damage or deterioration at time of Substantial Completion. If damage or deterioration occurs, cut out and remove damaged or deteriorated through-penetration firestop systems immediately and install new materials to produce through-penetration firestop systems complying with specified requirements.

3.7 INSTALLATION OF CONSTRUCTION JOINT FIRESTOP SYSTEM
A. General:

1. Install construction joint firestop systems to comply with “Performance Requirements” and firestop systems manufacturer’s written installation instruction and published drawings for products and applications.

2. Install forming/damming/backing materials and other accessories of types required to support fill material during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings indicated. a. After installing fill materials, remove combustible forming materials and other accessories not indicated as permanent components of firestop system.

3. Install fill “Forming Materials” for firestop systems by proven techniques to produce the following results:
a. Fill voids and cavities formed by openings, forming materials, and accessories as required achieving fire-resistance ratings indicated.
b. Apply materials so they contact and adhere to substrates formed by openings. c. For fill materials that will remain exposed after completing work, finish to produce smooth, uniform surfaces that are flush with adjoining surfaces.

B. Field Quality Control

1. Proceed with enclosing construction joint firestop systems with other construction only after inspection and approval code authorities.

2. Where deficiencies are found, repair or replace construction joint firestop systems so they comply with requirements.

3. Inspection Agency: If required, Owner will engage a qualified independent inspecting agency to inspect construction joint firestop systems comply with or deviate from requirements.

C. Cleaning and Protection

1. Clean off excess fill materials adjacent to openings as work progresses by methods and with cleaning materials that are approved in writing by construction joint firestop systems manufacturer and that do not damage materials in which openings occur.

2. Provide final protection and maintain conditions during and after installation that ensure constriction joint firestop systems are without damage or deterioration at time of substantial completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated construction joint firestop systems immediately and install new City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 27
materials to produce construction joint firestop systems complying with specified requirements.

3.8 INSTALLATION OF DUCT WRAP FIRESTOP SYSTEMS – AIR AND GREASE A. General:

1. Install Grease Duct and Air Duct wrap firestop system to comply with firestop system manufacturer’s written installation instructions and published drawings for products and applications indicated.

2. Install in accordance with listed and approved testing designs.

3. Install duct wrap firestop system in direct contact with the duct type and size that is enclosed. a. Protect every portion of duct with no less than listed layers of wrap. b. Overlap both perimeter and longitudinal joints with listed dimensional requirements.

4. Locate grease duct access doors at horizontal cleanouts are required by local codes. a. Protect with layers of duct wrap firestop system material as listed and overlapping previous layers on all sides and in accordance with manufacturer’s instructions.

5. Protect floor and wall penetrations with an approved through-penetration firestop system having an F and T hourly rating not less than that of the assembly penetrated and installed in accordance with manufacturer’s instructions as follows:
a. Grease Ducts (1 or 2-hour enclosure):
1) Option A: 2 layers of duct wrap firestop system material per manufacturer’s installation instructions, maintaining 3” transverse and longitudinal overlaps continuous through the penetration.
2) Option B: Tightly butt duct wrap firestop system material to the floor or wall on both sided of the assembly. Fill remaining annular space (3” minimum) between the wrapped duct (Option A) or bare steel duct (Option B) and periphery of the opening with 4 ¼“ thickness of scrap duct wrap firestop opening. Apply ¼” minimum 2000+ Silicone over packing material, within the annulus, flush with top surface of floor or both surfaces of wall.
b. Air Ducts (1-hour enclosure):
1) Option A: 1 layer duct wrap firestop system material per manufacturer’s installation instructions, maintaining 3” transverse and longitudinal overlaps or optional 3” perimeter overlap with longitudinal butt joints plus duct wrap firestop system collar over exterior layer joints.
2) Option B: Tightly butt duct wrap firestop system material to the floor or wall on both sides of the assembly. Fill remaining annular space between the wrapped duct (Option A) or bare steel duct (Option B) and periphery of the opening with 4 ¼” thickness of scrap duct wrap firestop material or 4 1’4” pcf material wool batt firmly packed into opening. Apply ¼” minimum 2000+ Silicone over packing material within the annulus, flush with top surface of floor or both surfaces of wall. c. Air Ducts (2-hour enclosure):

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 28
1) Same as 1-hour air duct enclosure system except apply 2 layers of duct wrap firestop system material per manufacturer’s installation instructions.

B. Repair Procedure

1. Repair damaged duct wrap firestop system material in accordance with manufacturer’s instructions.

2. Remove damaged section. Apply a new section of the same dimension. Place and fit ensuring same overlap that existed previously. Place banding around new duct wrap firestop system material and tension to sufficiently hold in place.

3. If damage has penetrated to interior layer, remove affected sections and reinstall inb accordance with manufacturers written specifications.

3.9 INSTALLATION OF COMPOSITION EDGE BANDING AND CORE MATERIAL FIRESTOP SYSTEMS A. Preparation

1. Clean surfaces to be in contact with adhesive face of intumescent seal material of dirt, grease, oil, loose materials, rust or other substances that may affect proper fitting and adhesion.

B. Installation

1. Peel off release liner and press graphite intumescent seal (GIS) into place around door/window frame (head and jamb) at point of contact between door and frame

2. Trim off excess and paint to match the frame

3.10 FILL AND FORMING MATERIALS
A. Installation

1. Forming Material:
a. Install and repair endothermic mats in accordance with manufacturer’s published installation guidelines and drawing packages
b. Compression fit in accordance with UL Design and product manufacturer’s recommendations.
c. Fit between flutes for tight fit prior to application of Fill Material – Fire Spray.

2. Fill Material:
a. Install in accordance with product manufacturer’s recommendations. b. Spray applied products shall be install in accordance with UL Design and product manufacturer’s recommendations.
c. Install with proper overlap onto gypsum wallboard and metal deck and/or concrete deck in accordance with UL Design and manufacturer’s recommendations.

3. General:
a. See Through Penetration Firestop System Schedule for penetrating items for UL approved systems

3.11 FIELD QUALITY CONTROL
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 29
A. Prepare and install firestopping systems in accordance with manufacturer's printed instructions and recommendations.

B. Follow safety procedures recommended in the Material Safety Data Sheets.

C. Finish surfaces of firestopping, which are to remain exposed in the completed work to a uniform and level condition.

D. All areas of work must be accessible until inspection by the applicable Code Authorities.

E. Correct unacceptable firestops and provide additional inspection to verify compliance with this section.

3.12 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor's NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 07 84 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
FIRESTOPPING 07 84 00 - 30
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 1
SECTION 07 92 00 – SEALANTS AND CAULKING
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Furnish and install primers, sealant, caulking and back-up material where required, as indicated and as herein specified to provide a weather-tight building, including, but not limited to:
a. Sealant joints
b. Lap joints
c. Troweled sealant bed below thresholds, sill flashings, etc. d. Sealant bed under door thresholds
e. Sealant at wall to floor and wall to deck / structure, acoustical and non-acoustical assemblies
1) Rated conditions; refer to Section 07 84 00 – Firestopping f. Sealant around all wall penetrations, acoustical and non-acoustical assemblies 1) Rated conditions; refer to Section 07 84 00 – Firestopping

2. Furnish and install two side adhesive tapes and primers.

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Architectural Manufacturers Association (AAMA)

1. AAMA 850 - Voluntary Specifications and Test Methods for Sealants E. American Concrete Institute (ACI)

1. ACI 302.1R - Guide for Concrete Floor and Slab Construction.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 2
F. American Society for Testing and MATERIALS (ASTM):

1. ASTM C412 - Standard Specification for Concrete Drain Tile

2. ASTM C510 - Multi Component Joint Sealants

3. ASTM C603 - Standard Test Method for Extrusion Rate and Application Life of Elastomeric Sealants

4. ASTM C639 - Standard Test Method for Rheological (Flow) Properties of Elastomeric Sealants

5. ASTM C661 - Standard Test Method for Indentation Hardness of Elastomeric-Type Sealants by Means of a Durometer

6. ASTM C719 - Adhesion & Cohesion of Elastomeric Joint Sealants under Cycle Movement

7. ASTM C790 - Guide for Use of Latex Sealants.

8. ASTM C792 - Effects of Heat Aging on Weight Loss, Cracking & Chalking of Elastomeric Sealants

9. ASTM C794 - Adhesion and Peel of Elastomeric Sealants

10. ASTM C804 - Practices for Use of Solvent - Release Type Sealants.

11. ASTM C834 - Specifications for Latex Sealing Compounds.

12. ASTM C881 - Specifications for Epoxy - Resin Bonding Systems for Concrete.

13. ASTM C919 - Practices for Use of Sealants in Acoustical Applications.

14. ASTM C920 - Specification for Elastomeric Joint Sealants.

15. ASTM C1135 - Standard Test Method for Determining Tensile Adhesion Properties of Structural Sealants

16. ASTM C1184 - Specification for Structural Sealants.

17. ASTM C1193 - Standard Guide for Use of Joint Sealants.

18. ASTM C1247 - Standard Test Method for Durability of Sealants Exposed to Continuous Immersion in Liquids

19. ASTM C1248 - Staining of Porous Substrates by Joint Sealants

20. ASTM D412 - Standard Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers-Tension

21. ASTM D614 - Tear strength

22. ASTM D624 - Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers

23. ASTM D1149 - Standard Test Method for Rubber Deterioration-Surface Ozone Cracking in a Chamber

24. ASTM D1850 - Specification for Concrete Joint Sealer Cold-Application Type

25. ASTM D2240 - Standard Test Method for Rubber Property - Durometer Hardness

26. ASTM D3960 - Standard Practice for Determining Volatile Organic Compound (VOC) Content of Paints and Related Coatings

27. ASTM E119 - Standard Test Methods for Fire Tests of Building Construction and Materials
G. Federal Specifications (FS):

1. SS-S-200E Sealants, joint, Two - Component, Jet - Blast - Resistant, Cold - Applied, for Portland Cement Paving
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 3

2. TT-S-001657 Sealing Compound: Single Component, Butyl Rubber Based, Solvent ReleaseType (For Buildings and Other Types of Construction)

3. TT-S-00227E All multi-component, cold applied formulations for sealing, glazing, etc. in buildings

4. TT-S-1543A One-part silicone based cold applied non-sag formulations for sealing, glazing, etc. in buildings
H. Sealant, Waterproofing and Restoration Institute (SWRI) - Sealant and Caulking Guide Specification. www.swrionline.org
I. Underwriters Laboratories (UL):

1. UL 263
J. Dow Corning:

1. Technical Manual

2. Accelerated Weathering and Heat Stability of Various Perimeter Sealants

3. Application and Maintenance Guide, ALLGuard Silicone Elastomeric Coating

4. Waterproofing Sealant Guide
K. Laticrete installation instructions and literature for System Warranty assemblies and sealant applications.

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Sealant Refer to Materials Heading(s) Refer to Materials Heading(s) Refer to Materials Heading(s) Primers Refer to Materials Heading(s) Refer to Materials Heading(s) Refer to Materials Heading(s) Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

D. Construction Monitoring/Observations by others:

Item Name of Test Performance Results By Whom
Sealant and
backer rod
Const. Waste
Management
Comply Refer to Division 1 for construction waste
management and disposal/recycling
requirements
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 4

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
D. Submit the following items for Architect’s review; refer to Section 01 33 00 – Submittal Procedures for definitions, specific requirements for each type of submittal, and minimum quantities.

1. Manufacturer’s Product & Technical Data

2. Manufacturer MSDS Sheets

3. Manufacturer Installation Instructions

4. Samples:
a. Digital samples will not be accepted for any product requiring color selection by Architect. b. When indicate by these specifications, drawings or associated specifications, provide sample of required Custom color for Architect’s review.

1.5 MOCK-UPS:

A. Erect an Assembly Mockup at Project site at location acceptable to Owner and Architect.

1. Refer to individual specification sections for coordination with other Assembly components.

2. Refer to Section 01 33 00 – Submittal Procedures for additional information relating to MockUps.

1.6 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer shall have been in business for five (5) years providing/installing/finishing similar size projects and complexity.

C. Manufacturer shall have been in business for ten (10) years providing/installing/finishing similar size projects and complexity.

D. Sealants, which come in contact with each other, shall be of same manufacturer and sealant type to ensure that materials, which come in contact with one another, will be compatible. Installer shall supply a letter from the manufacturer certifying the compatibility of all sealants with one another, and with all construction materials with which they will come in contact on the project.

E. Lead Times:

1. General Contractor shall coordinate with supplier to verify product lead times during bids and at award of contract, and account for such lead times in their costs and schedules.

2. General Contractor shall provide an itemized list of materials which might have or are confirmed to have a lead time problem and what the anticipated lead time is.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 5

3. General Contractor shall certify in writing that all materials have acceptable lead times as they relate to availability for sub-contractor and General Contractor to meet construction schedule and sequence of construction.

F. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid G. Stipulations:

1. All work must be installed in accordance with SWRI Guide Specifications and ASTM C1193.

2. Perform acoustical sealant application work in accordance with ASTM C919.

H. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

Agenda for meeting shall include, but not be limited to;

1. Substrate preparation

2. Colors and where applied

3. Sequence of sealant installation and other paints, sealers, etc.

4. General Contractor shall request meeting 5 days in advance of construction.

I. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures.

Manufacturer’s representative shall review and certify in writing all phases of construction to verify the complete work meets specification requirements.

Written certification of all phases of construction shall be sent to the Architect by the manufacturer’s representative.

J. Miscellaneous criteria:

1. Manufacturer to instruct applicator in procedure for intersecting sealants.

2. Workmanship shall be of the highest quality in accordance with the best practice, an in strict

1.7 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver materials in factory sealed containers with manufacturer’s original labels attached.

1.8 JOB CONDITIONS
A. Field verify that all components, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

B. Do not apply sealants at temperatures below 40ºF (4ºC) unless additional steps are taken to prevent freezing and frost buildup.

C. Apply waterproofing, water repellents, and preservatives after application of sealants unless manufacturer's approval is obtained prior to applying sealant.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 6

1.9 PROTECTION
A. Protect finish surfaces at all times from concrete adjacent to them.

B. Inspect forming against such work and establish tight leak proof seal before concrete is placed within or against the forming.

C. Finish work defaced with concrete on surface shall be replaced.

D. Concrete to be left exposed: Do not place materials such as Visqueen or Burlap, etc. on concrete, which might leave a pattern and/or imprint.

1.10 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish manufacturer’s additional twenty (20) year “Weather Seal” warranty/warrant agreeing to replace sealant material work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.11 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Water tight wall penetrations

2. Air tight wall penetrations

3. Wall construction

4. Floor construction

5. Ceiling construction

6. Roof construction

7. Windows, doors, etc.

8. Site work / flatwork and paving

9. Flashing

10. Door thresholds
B. Related sections include, but are not limited to the following:

1. Division 1

2. Section 07 84 00– Firestopping

1.12 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 7

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.13 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

1.14 EXTRA MATERIAL
A. Submit as part of project closeout:

1. Provide extra material for each product type, color, finish, etc. in same lot as installed product. a. Furnish written certification that extra materials supplied have been inspected and Re-confirmed to be the same as those used in the work.

2. Provide extra material in unopened fully labeled containers. a. Do not supply anything less the full carton containers. b. Furnish in factory packaged and labeled cartons and identify cartons with Project name. c. Deliver materials to project premises just prior to substantial completion, and store in the location directed by the Owner.

3. Provide the following:
a. 6 tubes/ sausages of each type and color of sealant used.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer for each product type.

B. Acceptable manufacturer shall be one of the following and as herein listed and in Drawings:

1. Exterior: Dow Corning, www.dowcorning.com

2. Interior at specific locations: Pecora Corporation, www.pecora.com

3. Interior typical unless indicated otherwise: Dow Corning, www.dowcorning.com

4. Interior Tile installation, Typical Laticrete, www.laticrete.com or Merkrete a. Refer to Section 09 30 00 – Tile and Stone for warranty criteria for assembly

5. Two sided adhesive tapes: 3M, http://solutions.3m.com

6. Mastic / Sealant to set door thresholds in: Tremco, www.trimcosealants.com

7. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 8
c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.
d. No acceptable substitutions for exterior 100% silicone sealants, unless herein otherwise indicated.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS – SEALANT JOINT SCHEDULE
A. Sealant- Exterior Joints:

1. General:
a. Intent is that buildings be rendered weathertight in every respect. b. Intent is that wall and roof assemblies be rendered watertight at sealant joints. c. Render wall penetrations airtight.
d. Render bottom of wall conditions airtight.
e. Workmanship shall be of the highest quality in accordance with the best practice, an in strict compliance with the recommendations of the manufacturer of the material being used.

2. Horizontal and Vertical joints, typ. u.o.n., including but not limited to:
a. Concrete, Masonry, Natural Stone, Simulated Stone, Terra Cotta and Wood:
1) Dow Corning: 795 Type 3
b. Painted Metals, Anodized Aluminum, Mill Finish Aluminum, PVC, Glass, Ceramic and/or Porcelain Tile, Glazed Terra Cotta, Glazed Ceramic and/or Porcelain tile:
1) Dow Corning: 795 Type 3
c. Concrete Flatwork:
1) Dow Corning SL (Self Leveling) Type 6 – Level Conditions 2) Dow Corning NS (Non Sag) Type 6 – Sloped conditions

3. Metal Coping: (Cross joints)
a. Dow Corning: 795 Type 3

4. Vertical concealed joints in:
a. Metal curtain wall, lapped joints, and metal building panels:
1) Dow Corning: 795 Type 3
b. Exterior Gypsum Sheathing:
1) Dow Corning: 795 Type 3
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 9
c. Vehicular drives: Dow Corning FC (Fast Cure) Type 5 – Extreme movement conditions
d. Dow Corning SL (Self Leveling) Type 5 – Level conditions e. Dow Corning NS (Non Sag) Type 6 – Sloped conditions
B. Sealant - Interior Joints – Horizontal and Vertical:

1. Expansion and control joints, typ. u.o.n.:
a. Non – Sanitary conditions:
1) Pecora Dynatred 40+ Type 10
b. Horizontal traffic surfaces
1) Pecora Dynatred 40+ Type 10
c. Subject to heavy traffic loads or point loading such as high heel traffic:
1) Pecora Dynatred 40+ Type 10
d. Warehouse Floors
1) Sonneborn EPOLITH - P Type 12 Horizontal applications 2) Sonneborn EPOLITH - G Type 12 Vertical applications

2. Trim or finish joints subject to minimal movement:
a. Pecora AC-20 + Silicone Type 9

3. Concealed applications:
a. Requiring acoustical seal:
1) Pecora AC-20 + Silicone Type 9
2) Pecora AC-20 FTR Type 9 (Rated conditions)
b. Base of wall between gypsum board and concrete floor:
1) Pecora AC-20 + Silicone Type 9
2) Pecora AC-20 FTR Type 9 (Rated conditions)
c. Wall penetrations seal:
1) Pecora AC-20 + Silicone Type 9
2) Rated conditions: refer to Section 07 84 00 – Firestopping

4. Horizontal and vertical joints exposed to harsh chemicals:
a. Pecora GC-2 Synthacalk Type 13

2.3 MATERIALS – SEALANT SPECIALTY SCHEDULE
A. Below Door Thresholds:

1. Application: Set threshold in full bed of sealant also indicated as mastic City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 10

2. Product options:
a. Mfgr: Tremco
b. Type: One part polyurethane
c. Model: Vulkem 116
d. Color: Black
e. Application: 1/2” thick maximum bed prior to compressing down with threshold B. Below Storefront and/or Curtainwall Sill Mullions:

1. Application: Set sill in full bed of sealant also indicated as mastic

2. Product options:
a. Mfgr: Tremco
b. Type: One part polyurethane
c. Model: Vulkem 116
d. Color: Black
e. Application: 1/2” thick maximum with bed prior to compressing down with threshold

2.4 MATERIALS - SEALANTS / CAULKING TYPES
A. Schedule and Data:

1. Sealant Type 1:
a. Type: Single component, ultra low modulus, silicone rubber sealant; b. Standards
1) ASTM: C661, C679, C719, C794, C1135, C1248, D412, D624, D2240, D3960 2) VOC: 43g / liter max.
c. Movement capability: 100% extension, 50% compression. d. Mfgr: Dow Corning
e. Product: 790 Silicone Building Sealant – H.P.
f. Features: USDA approved
g. Primer: Refer to Table I of Spec-Data sheet for sealant, to include:
1) 1200 Prime Coat
2) 1593 Cleaner/Primer
h. Backer rod / Tape:
1) Closed-cell polyethylene, non-gasing polyolefin, polyethylene tape 2) Open-cell polyurethane required at nonporous substrates 3) Open-cell polyurethane required at double joint conditions i. Colors:
1) Architect to pick color(s) from mfgr’s full line of colors.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 11

2. Sealant Type 2:
a. Type: Single component, medium modulus, elastomeric silicone sealant; b. Standards
1) ASTM: C603, C639, C679, C794, C1135, C1248, D624, D2240, D3960 2) VOC: 46g / liter max.
c. Movement capability: 50% extension, 50% compression. d. Manufacturer: Dow Corning
e. Product: 791 Silicone Perimeter Sealant
f. Features: Appropriate for End-dams and Internal seals g. Primer: Confirm with sealant manufacturer and test surface for adhesion h. Backer rod / tape:
1) Closed-cell polyethylene foam
2) Open-cell Polyurethane
3) Polyethylene tape
4) Open-cell polyurethane required at nonporous substrates 5) Open-cell polyurethane required at double joint conditions i. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

3. Sealant Type 3:
a. Type: Single component, silicone rubber sealant;
b. Standards
1) ASTM: C510, D412, D624, D1149, D2240, D3960, E119
2) UL: 263
3) VOC: 28g / liter max.
c. Movement capability: 50% extension, 50% compression. d. Manufacturer: Dow Corning
e. Product: 795 Silicone Building Sealant
f. Features: Structural, non-structural and weatherproofing g. Primer:
1) Confirm with sealant manufacturer and test surface for adhesion 2) Use recommended primer
h. Backer rod / tape types:
1) Closed-cell polyethylene foam
2) Open-cell Polyurethane
3) Polyethylene tape
4) Mineral Wool – Fire rated assemblies
5) Compression Gasket
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 12
6) Open-cell polyurethane required at nonporous substrates 7) Open-cell polyurethane required at double joint conditions 8) Color:
a) Architect to pick color(s) from mfgr’s full line of colors.

4. Sealant Type 4:
a. Type: Two part, ultra-low modulus, cold applied, self-leveling, fast-cure silicone rubber; b. Condition: Extreme movement
c. Standards
1) ASTM: C719, C1135, D412, D2240, D3960
2) VOC: 30g / liter
d. Movement capability: 100% extension, 50% compression. e. Slope: Up to 6%
f. Manufacturer: Dow Corning
g. Product: FC
h. Features: Fast cure, parking structure sealant
i. Primer: 950 PDX, 1205 Prime Coat
j. Backer Rod: Open-cell
k. Color:
1) Dark Grey

5. Sealant Type 5:
a. Type: One-part, ultra-low modulus, cold applied, self-leveling silicone rubber; b. Condition: Level Conditions
c. Standards
1) ASTM: C719, C1135, D412, D2240, D3960
2) VOC: 30g / liter max.
d. Movement capability: 100% extension, 50% compression. e. Slope: Up to 6%
f. Manufacturer: Dow Corning
g. Product: SL
h. Features: Fast cure, parking structure sealant – cures with air moisture i. Primer: Confirm with sealant manufacturer
j. Backer Rod: Closed-cell polyethylene foam
k. Color: Grey

6. Sealant Type 6:
a. Type: One-part, low modulus, cold applied, silicone rubber; b. Condition: Sloped or vertical Condition
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 13
c. Standards
1) ASTM: C661, C719, C794, C1135, D412, D3960
2) VOC: 37g / liter max.
d. Movement capability: 100% extension, 50% compression. e. Slope: Horizontal and Vertical
f. Manufacturer: Dow Corning
g. Product: NS
h. Features: Non-sagging, cures with air moisture
i. Primer: Confirm with sealant manufacturer
j. Backer Rod: Closed-cell polyethylene foam
k. Color: Grey

7. Sealant Type 7:
a. Type: Single component, ultra-low modulus, elastomeric silicone sealant; b. Standards
1) FED TT-S-001543A & TT-S-00230C Class A
2) ASTM: D3960
3) VOC: [fill in]
c. Movement capability: 100% extension, 50% compression. d. Manufacturer: Dow Corning
e. Product: 890 SL Silicone Building Sealant
f. Features: Self leveling & tooling not required
g. Primer: Not required
h. Backer Rod: Closed cell
i. Color: Dark Grey

8. Sealant Type 8:
a. Type: Single component sealant;
b. Standards
1) ASTM: D412, D624, D2240, D3960
2) VOC: 40g / liter max.
c. Movement capability: 25% extension, 25% compression. d. Manufacturer: Dow Corning
e. Product: 999-A Silicone Building & Glazing Sealant
f. Features: FDA & USDA approved
g. Primer: Refer to “Surface Preparation Guide, No. 61-182” h. Backer rod / tape:
1) Closed-cell polyethylene foam
2) Polyurethane
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 14
3) Polyethylene tape
i. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

9. Sealant Type 9:
a. Type: (Type II) Single component, acrylic latex sealant; b. Standards
1) ASTM: C834, D3960
2) VOC: 31g / liter
c. Movement capability: 7.5% extension and 7.5% compression. d. Manufacturer: Pecora
e. Product: AC-20 + Silicone (AC-20 FTR rated conditions) f. Features: Non-sag (FTR designation at fire rated conditions) g. Backer Rod: Soft Polyethylene or Denver Foam (Ultra block at fire rated conditions)
h. Primer: Refer to manufacturer’s product data
i. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

10. Sealant Type 10:
a. Type: (Type II) Two component, non-sag polyurethane rubber; b. Paintability: Yes
c. Standards
1) ASTM: C920, C1247, D1850, D3960
2) VOC:
a) Activator: 104g / liter
b) Base: 14g / liter
d. Movement capability: 25% extension and 25% compression. e. Manufacturer: Pecora
f. Product: Dynatread 40+
g. Features: Traffic sealant
h. Backer Rod: Closed-cell Polyethylene
i. Primer: Refer to manufacturer’s product data
j. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

11. Sealant Type 11:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 15
a. Type: (Type I) Two component urethane
b. Standards
1) ASTM: C920, D1850, D3960
2) VOC: 0g / liter
c. Movement capability: 25% extension and 25% compression d. Manufacturer: Pecora
e. Product: NR-200 Urexpan
1) Activator
2) Base
f. Features: Traffic grade sealant
g. Backer Rod: Closed-cell Polyethylene
h. Primer: Refer to manufacturer’s product data
i. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

12. Sealant Type 12:
a. Type: (Type II) Two component, 100% solids epoxy
b. Standards
1) ASTM: D638, D3960
2) VOC:
a) Epolith P: < 3g / liter
b) Epolith G: 0g / liter
c. Movement capability: 75% elongation.
d. Manufacturer: Sonneborn
e. Product
1) Horizontal: Epolith-P
2) Vertical: Epolith-G
f. Backer rod / tape: Refer to manufacturer’s product data g. Primer: Refer to manufacturer’s product data
h. Color: Grey

13. Sealant Type 13:
a. Type: Two component, polysulfide rubber sealant;
b. Standards
1) ASTM: C920, C510, D3960
2) VOC: 20g / liter
c. Movement capability: 12.5% extension and 12.5% compression.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 16
d. Manufacturer: Pecora
e. Product: Synthacalk GC-2+
f. Features: Not self leveling
g. Backer Rod: Closed-cell Polyethylene
h. Primer: Refer to manufacturer’s product data
i. Color: Dark Grey

14. Sealant No. 14:
a. Type: One part Butyl Rubber compound
b. Standards
1) ASTM: C1085, D3960
2) VOC: < 250g / liter
c. Movement capability: 5% extension and 5% compression d. Manufacturer: Pecora
e. Product: BC-158
f. Features: USDA Approved
g. Backer rod / tape:
1) Pecora #92 Green rod
2) #91 Denver Foam
3) Bond break or tape
h. Primer: Not required
i. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

15. Sealant No. 15:
a. Type: Two part, non-sag, security grade polyurethane sealant; b. Paintability: Yes
c. Standards
1) ASTM: C920, D3960
2) VOC: 15 g / liter
d. Movement capability: 12.5% extension and 12.5% compression e. Manufacturer: Pecora
f. Product: Dynaflex
g. Features: Physical abuse tolerant
h. Backer Rod: Closed cell Polyethylene
i. Primer: P-75, P-120
j. Temp. range: -20º – 180º
k. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

16. Sealant No. 16:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 17
a. Type: (Type II) Single component, acrylic latex sealant; b. Standards
1) ASTM: C834, D3960
2) VOC: 31g / liter
c. Movement capability: 7.5% extension and 7.5% compression. d. Manufacturer: Pecora
e. Product: AC-20 + Silicone (AC-20 FTR rated conditions) f. Features: Non-sag (FTR designation at fire rated conditions) g. Backer Rod: Soft Polyethylene or Denver Foam (Ultra block at fire rated conditions)
h. Primer: Refer to manufacturer’s product data
i. Color:
1) Architect to pick color(s) from mfgr’s full line of colors.

2.5 MATERIALS – TAPES
A. Schedule and Data:

1. Tape:
a. General:
1) Mfgr: 3M
2) Series: VHB and as noted
3) Reference: 3M Design Guide for Metal Fabrication
4) Coordinate with Section 10 14 00 - Signage
b. Schedule:
1) Painted metal to painted metal:
a) Material: Closed cell acrylic foam
i. Product: 4979F
a. Width: 1”
b. Thickness: 1.6 mm (± 1/16”)
c. Adhesive: Acrylic
d. Liner Type: B (5 mil clear polyethylene film)
e. Color: Black
2) Painted metal to bare painted metal:
a) Material: Closed cell acrylic foam
i. Product: 5962
a. Width: 1”
b. Thickness: 1.6 mm (± 1/16”)
c. Adhesive: Synthetic
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 18
d. Liner Type: D (5 mil red polyethylene film)
e. Color: Dark Grey
3) Powder coated metal to powder coated painted metal:
a) Material: Closed cell acrylic foam
i. Product: 4645
a. Width: 1”
b. Thickness: 1.6 mm (± 1/16”)
c. Adhesive: Acrylic
d. Liner Type: D (5 mil red polyethylene film)
e. Color: Dark Grey
4) Bare metal to bare metal:
a) Material: Closed cell acrylic foam
i. Product: 4955
a. Width: 1”
b. Thickness: 2.0 mm (± 5/64”)
c. Adhesive: Synthetic
d. Color: White
5) Plastics and powder coated metals:
a) Material: Closed cell acrylic foam
i. Product: 5962
a. Width: 1”
b. Thickness: 62 mil
c. Adhesive: Adhesive 300 Acrylic & polyester carrier
d. Liner Type: Densified Kraft
e. Colors:
i). White
ii). Black
iii). Red

2.6 OTHER MATERIALS
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the General Contractor subject to the approval of the Architect.

1. Primers, Solvents and Backing Material
a. General:
1) Use acceptable type as recommended by each specific sealant used and the respective manufacturer.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 19
2) Material shall be manufactured by manufacturer of sealant being used, unless approved otherwise by sealant manufacturer.
3) Materials shall be delivered to the job in sealed containers with manufacturer's original labels attached and associated installation instructions. 4) Materials shall be used according to manufacturer's printed instructions.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify. Prior to all work of this Section, carefully inspect and verify that the installed work of all other trades is complete to the point where this work may properly commence.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. General:

1. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

B. Joint Preparation:

1. Preparation, cleaning, priming and installation shall be performed in strict accordance with sealant manufacturer’s recommendations.

2. Refer to REFERENCE STANDARDS heading for sealant manufacturers guidelines.

C. Surface Preparation

1. Sealants
a. General:
1) Typically seal joints before painting, coordinate with wall finish type, material and manufacturer’s written recommendations for all exceptions.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 20
2) Joints and surfaces, which are to be caulked or sealed, shall be clean, dry, frost free, free of dust, loose mortar, and other foreign materials. 3) Temperature Installation Requirements: 40ºF minimum application temperature for joint sealant installations because of the possibility of moisture and/or frost contamination on sealing surfaces: (Comply with sealant manufacturer’s written recommendations)
a) However, it is recognized that applications may have to be made at lower temperatures. When this is necessary, steps must be taken to assure dry, frost-free surfaces and is the responsibility of the caulking subcontractor. Additionally these procedures must be in compliance with sealant manufacturer’s written recommendations.
4) Clean ferrous metals of all rust, mill scale and temporary coatings by wire brushing, grinding, or sandblasting.
5) Remove oil and grease with high performance cleaners as approved by sealant manufacturer.
6) On joints adjacent to porous substrates install appropriate primer prior to application of sealant.
7) Joint dimensions for sealant should be reviewed and installed in accordance with sealant manufacturer's printed instructions. In no case should the sealant application be less than 1/4" wide and 1/2" deep, except in specific metal-to-metal curtainwall applications and then as recommended by the sealant manufacturer. 8) Precast concrete, cast-in-place concrete, or masonry joint surfaces shall be wire brushed, then brushed clean or blown clean with dry, oil free compressed air. a) The joint interface must be free of form release agents, curing and sealing compounds or chemical retarders which may interfere with sealant cure, adhesion and performance.
9) Sealants shall not be applied to masonry joints where a water repellent or masonry preservative has been applied prior to caulking.
a) Waterproofing treatments shall be applied after caulking. 10) Do not caulk joints until they are in compliance with requirements of the approved manufacturers of the materials, the details as shown on the drawings, and the specific requirements of other sections of this Specification.
b. Silicone Sealants:
1) Basic steps for proper joint preparation:
a) Clean – Joint surfaces must be clean, dry, dust free, and frost free. b) Prime – If required, primer is applied to the surface(s). (Refer to Sealant Manufacturer’s written recommendations.
c) Pack – Backer rod or bond breaker as required for sealant joint and in accordance with manufacturer’s written instructions.
d) Shoot – Sealant is applied by “pushing the bead” into the joint cavity.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 21
e) Tool – Dry tooling techniques are used to strike a flush joint and make certain the sealant has the proper configuration and fully contacts the joint walls. 2) Clean – Substrate Cleaning Procedures
a) General procedures for porous and non-porous substrates key to good sealant adhesion is a clean surface. Always check with the supplier of the substrate to ensure that the cleaning procedures and solvents are compatible with the substrate.
i. Organic Solvent Usage
a. Not every contamination is effectively removed by every solvent, and some substrates can be seriously damaged by certain solvents. Please follow the solvent manufacturer’s safe handling recommendations and local, state and federal regulations regarding solvent usage. ii. Non-Porous Substrates
a. Non-porous surfaces must be cleaned with a solvent before the sealant is applied.
b. Use the “two-cloth” cleaning method explained later in this section. iii. Porous Substrates
a. Building materials such as EIFS, cement board panels, concrete, granite, limestone and other stones or cementitious materials that absorb liquid are considered porous substrates.
b. Dusting alone may be sufficient cleaning for new porous substrates.

Depending on the condition of the surface, porous substrates may require abrasion cleaning, solvent cleaning or both. Laitance and surface dirt must be completely removed. Concrete form-release agents, water repellents and other types of surface treatments, protective coatings, and old sealant all affect sealant adhesion. Removal of these treatments, coatings or sealants by abrasion cleaning may be required to obtain acceptable adhesion.
c. Abrasion cleaning involves grinding, saw cutting, sand or water blasting, mechanical abrading or a combination of these methods. Remaining dust and loose particles should be removed by dusting the surface with a stiff brush, vacuuming, or blowing the joints with oil-free compressed air.

Once the abraded surface is clean and dry, the sealant can be applied. If the surface is dirty, it must be solvent cleaned with the “two-cloth” method explained later in this section. Some porous materials will trap solvents after cleaning or priming. Allow this solvent to evaporate before sealant is applied.
d. Please note sealant recommendations for removal of existing sealants, substrate cleaning, joint preparation and installation of sealants are not intended and may not be appropriate for remedial work involving City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 22
existing sealants and/or joints containing PCB’s, asbestos, or other potentially hazardous substances. If you know or suspect that the existing sealants and/or joints contain PCB’s or other hazardous substances, contact project Owner General Contractor and a knowledgeable authority on appropriate removal, handling and disposal procedures.
iv. Masking
a. Silicone primers and sealants cannot be removed with organic solvents.

It is imperative that uncured silicone primers and sealants do not contact non-abradable surfaces where the silicone is not intended. Mask these surfaces or use extreme care to prevent any silicone contact with the surface during priming and sealant application.
v. “Two Cloth” Cleaning/Priming Method
a. (Using DOW CORNING P5200 Cleaner/Primer)
i). Clean, soft, absorbent, lint-free cloths must be used. The two-cloth cleaning method consists of a solvent wipe followed by a dry cloth wipe.
ii). Thoroughly clean all surfaces of loose debris. Mask or tape joints before applying Cleaner/Primer. If a bond breaker tape will be used instead of backer rod, the tape should be applied before the cleaner/primer.
iii). Clean and apply Cleaner/Primer product in accordance with manufacturer’s written recommendations.

2. Tapes
a. Prepare per manufacturer’s recommendations.
b. Prime as required by manufacturer for each specific tape.

3.4 INSTALLATION
A. Sealant

1. General:
a. Clean, prime and apply materials in accordance with printed recommendations of manufacturer of material used.
b. Insure that if two sealant-curing types are used which have different curing times, that the first installed sealant is fully cured prior to the application of the second sealant. 1) Confirm application with sealant manufacturer.
c. Insure that if two different sealant composition types are used, that the proper sealant is installed first to insure adhesion between the two different sealants. 1) Confirm application with both sealant manufacturers.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 23
d. Install joint backing with a blunt instrument so as not to puncture the surface skin. 1) Size of closed cell joint backing should be determined by adding 25% to the joint width to assure proper compression of the rod.
2) With other types of joint backing, consult manufacturer's printed instructions for proper use.
e. Apply sealant with a caulking gun, using proper nozzles. Use sufficient pressure to properly fill the joints with sealant to the backup material.
1) After joints have been completely filled, they shall be neatly tooled to eliminate air pockets or voids and to provide a smooth, neat finish in intimate contact with interfaces. Dry tooling is preferred.
2) After tooling, surface of sealant shall be free from ridges, wrinkles, sags, air pockets and embedded impurities.
f. Immediately clean adjacent materials, which have been soiled. Leave work in a neat, clean condition.
g. Joint Dimensions
1) Size and shape as shown on Drawings but not to exceed joint size recommended by sealant manufacturer.
a) Typically install backer rod at all joints unless specified to be bond breaker tape, other material as specified and /or detailed or no backer material in accordance with sealant manufacturer's printed directions.
i. Sealant depth to width ratio shall be installed in accordance with sealant manufacturer’s written instructions.

2. Silicone:
a. General:
1) Apply materials in accordance with printed recommendations of manufacturer of material used.
b. Schedule:
1) Prime – Primer Application Procedure
a) DOW CORNING P5200 Cleaner/Primer Coat should be applied as follows:
i. Joint surfaces should be clean and dry.
ii. Apply masking tape to the surfaces next to the joint to keep excess primer and sealant off areas where they are not intended.
iii. Apply Cleaner/Primer in accordance with manufacturer’s written recommendations.
2) Pack – Packing with Backer rod / tape
a) Moving Joint Considerations
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 24
i. When designing moving joints, the following points also need consideration:
a. A minimum ¼” joint width is recommended. Wider joints accommodate more movement than narrow joints. (Refer to Drawings for design intent joint widths)
b. Three-sided adhesion limits the amount of movement that a joint accept without inducing a tear. Three-sided adhesion can be eliminated by the addition of a bond breaker tape or backer rod. With three-sided adhesion, no more than +15% movement can be accommodated. c. A thin sealant joint (1/4” + 1/8” depth) will absorb more movement than a thick joint. Sealants are designed to deliver optimum performance when the joints are shaped like an hourglass
d. As a practical matter, as the sealant joint width becomes larger than 1”, the depth should be held at approximately 3/8”. There is no need to increase the depth beyond 3/8”.
b) Movement During Cure
i. One-part sealants cure by taking moisture out of ambient air. Joint movement during cure can cause unsightly aesthetics due to joint wrinkling. Premature adhesion loss can also occur because the adhesive characteristics of the sealant are obtained after the sealant has cured. Adhesion loss due to movement during cure can be minimized by the use of a primer. Primers can decrease the adhesion cure time lag. Minimize wrinkling by following these suggestions:
a. Use open-cell polyurethane backer rod / tape in non-EIFS or vertical applications.
b. Seal when the joint surface is cool and will experience minimum temperature changes, typically in the late afternoon or early evening. c. Place no more than 1/4” of sealant over the backer rod / tape at the center.
3) Shoot – Sealant Application Procedure
a) It is critical that the sealant fills the entire joint or cavity and firmly contact all surfaces intended to receive sealant.
b) To obtain full adhesion, sealants require a clean, dry, frost-free surface. c) Sealant shall be applied as follows:
i. As previously indicated, masking tape should be used to keep excess sealant from contacting adjacent areas where it is not intended to ensure an aesthetically-pleasing job.
ii. Apply the sealant in a continuous operation using a caulking gun or pump. A positive pressure, adequate to fill the entire joint width, should be used. This can be accomplished by “pushing” the sealant ahead of the application nozzle.

Care must be taken to ensure complete fill of the sealant cavity. 4) Tool
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 25
a) Tool the sealant with light pressure before a skin begins to form (typically 10 to 20 minutes). Tooling forces the sealant against the back-up material and the joint surfaces. Do not use liquid tooling aids such as water, soap or alcohols; i.e. These materials may interface with sealant cure and adhesion and create aesthetic issues. b) Remove the masking tape before the sealant skins over (within about 15 minutes of tooling).

B. Polyurethane and Butyl Rubber:

1. Storefront and/or Curtainwall Sills & Door Thresholds a. Clean substrate and underside of threshold
b. Installation:
1) 1st. Prime substrate with mfgr’s approved primer
2) 2nd. Install full bed of sealant to substrate x ½” maximum thickness 3) 3rd. Install full bed of sealant to underside of threshold x 3/8” and set together. 4) 4th. Trim sealant that pushes out from under threshold. 5) 5th. Install mechanical fasteners.

C. Tape

1. Clean surfaces as herein listed.

2. Prime substrates per manufacturer’s recommendations.

3. Install per manufacturer’s written instructions.

3.5 COMMISSIONING
A. Provide factory-certified field service engineer to a site visit to ensure proper system installation of exterior sealant.

3.6 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator.

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

C. The sealant applicator shall certify in writing that the sealant application is in accordance with the sealant manufacturer's recommendations

3.7 PROTECTION AND CLEAN UP
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
SEALANTS AND CAULKING 07 92 00 - 26
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 07 92 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 1
SECTION 08 11 13 – STEEL DOORS AND FRAMES
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. STEEL DOORS: (fully welded assembly)
a. Interior:
1) Non-rated
b. Exterior:
1) Non-rated
2) Door vision panel frames
a. Rated proprietary design and manufacturers

2. STEEL DOOR FRAMES: (fully welded assembly)
a. Interior:
1) Non-rated
b. Exterior:
1) Non-rated

3. GLASS:
a. Door lites: As herein specified
b. Framed windows: Refer to Section 08 80 00 – Glass and Glazing

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American National Standards Institute (ANSI), www.ansi.org City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 2

1. ANSI/SDI A250.3 Test Procedure & Acceptance Criteria for Factory Applied Finish Coatings for Steel Doors & Frames

2. ANSI/SDI A250.4 Test Procedure & Acceptance Criteria for Physical Endurance for Steel Doors, Frames, Frame Anchors & Hardware Reinforcing

3. ANSI/SDI A250.6 Recommended Practice for Hardware Reinforcing on Standard Steel Doors & Frames

4. ANSI/SDI A250.7 Nomenclature for Standard Steel Doors & Steel Frames

5. ASNI/SDI A250.8 SDI 100 Recommended Specifications for Standard Steel Doors & Frames

6. ANSI/SDI A250.11 Recommended Erection Instruction for Steel Frames E. American Society for Testing and Materials (ASTM), www.astm.org F. Factory Mutual (FM), www.fmglobal.com
G. Hollow Metal Manufacturers Association (HMMA), www.naamm.org/hmma

1. Hollow Metal Technical and Design Manual, latest edition of the following:
a. Manufacturing: HMMA 802 Manufacturing of Hollow Metal Doors and Frames b. Doors: HMMA 810 Hollow Metal Doors
c. Frames: HMMA 820 Hollow Metal Frames
d. Hardware: HMMA 830 Hardware Preparation and Locations for Hollow Metal Doors and Frames
e. Installation: HMMA 841 Reserved for Tolerances and Standard Practices for Hollow Metal Doors and Frames
f. Continuous Fully Welded Frames: HMMA 820-TN02-03
g. Defining Door Undercuts: HMMA-810 TN01-03
h. Grouting Hollow Metal Frames: HMMA-820 TN01-03
i. Guidelines for Glazing, Windows & Sidelights: HMMA-820 TN03-07 j. Painting Hollow Metal Frames: HMMA-840 TN01-07
k. Maintenance of Installed Hollow Metal Frames: HMMA-840 TN02-10 l. Grouting Door Frames: HMMA-862
H. National Association of Architectural Metal Manufacturers (NAAMM) www.naam.org I. National Fire Protection Association (NFPA), www.nfpa.org

1. NFPA 80 Labeled Protective assemblies

2. NFPA 105 Installation of Smoke and Draft Control of 20 minute labeled door assemblies

3. NFPA 252 Smoke and Draft Control of 20 minute labeled door assemblies

4. NFPA 257 Glazing in Fire Rated Door Assemblies

5. NFPA 288 Floor Fire Door Assemblies
J. Steel Door Institute (SDI), www.steeldoor.org

1. Steel Door Institute Technical Data Series Guidelines

2. Steel Door Institute 110-09
K. Underwriters Laboratory (UL), www.ul.com

1. UL 10A

2. UL 14B

3. UL 14C
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 3

4. UL 1784 – Smoke and Draft control

5. Provide door assembly with “S” label

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Jambs:

Anchors shall be located on each jamb
starting from 4” from top and 24” on
center maximum on down with floor
anchor at base
Anchorage
Head:

Provide anchors at head not more than 24
inches on center and not less than two
per door head.

NAAMM Standards
HMMA 840, 861 & 830
Jamb and Head:

Anchors shall be 14 gauge galvanized
steel of size and length or shape required
by construction.

Floor: 12 gauge galvanized angles
welded to bottom of each door jamb and
vertical mullions with two holes in bottom
leg for ¼ inch wedge anchor each.

Anchors
Concrete Block Wall:

UL approved wedge anchor at dimpled
holes centered on stop face of frame
jambs and/or head.

HMMA 830 & 863
Hardware
Reinforcing
Comply HMMA 830 Hardware
Preparation Standard
HMMA 861 Guide
Specification
Grout Slump 4” max. slump
Pump into frame jambs and head
HMMA 820 TH01-03
HMMA 862
Door Frames
Grout type Mortar, not plaster HMMA 862
Assembly Non Rated HMMA 820 & 861
Rated, UL or FM Labeled HMMA 850 & 861
Security HMMA 862
Detention HMMA 863
Types
Acoustical (STC 44 min, u.n.o.) HMMA 865
Typical: 0.053” / 16 gauge
Door Frames
Gauge/thickness
4’-0” or greater opening:

0.067” / 14GA
NAAMM Standards
Door Glazing Type Safety & fire protected CBC, Section 715.4.7.4 City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 4
Door Frame
Plinths (Splats)
Assembly Shall be same thickness as frame and
flush with all jamb surfaces. (not a wraparound surface applied component) NAAMM Standards
HMMA 820
Core 22 gauge steel stiffeners with insulation
core
NAMM Standards
Assembly Non Rated: HMMA 810
Rated, UL or FM Labeled HMMA 850
Security HMMA 862
Detention HMMA 863
Types
Acoustical (STC 44 min, u.n.o. HMMA 865
Face Interior: 0.042” / 18 gauge HMMA 861
Exterior: 0.053” / 16 gauge HMMA 861
Edges HMMA 861
Doors
U-Value 0.18 max SDI-113-79
HMMA 861
Guide
Specification
HMMA 861 Guide
Specification
HMMA 861 Guide Specification HMMA 861 Guide
Specification
Typical Install 16 gauge channel within door body
at all sides of opening
B. Vision panel
frames
C. 0.032” / 20gauge
Door
Openings
Louver frames 0.0432” / 18 gauge SDI-100-91
Steel Frames
& Doors
Painting Comply HMMA-840 TN01-07 &
Section 09 90 00
Steel Sheets Hot Dipped
Galvanized
Comply ASTM A653-96 coating
designation A60 mill
phosphatized
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements.

D. Submit Manufacturer’s data and shop drawings.

1. Indicate construction, configuration, jointing methods, reinforcements, and locations of cut-outs of steel doors and frames.

2. Submit catalog cuts or other data indicating details of construction, gauges of metals, dimensions, hardware preparation, core, label compliance, profiles and specifications for shop priming.

3. Label Construction Certification:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 5
a. For door assemblies required to be fire-rated and exceeding sizes of tested assemblies, submit manufacturer's certification for that each door and frame assembly has been constructed to conform to design, materials and construction equivalent to requirements for labeled construction.

4. Identify each door and frame with Metal labels indicating similar applicable fire-rating.

5. Schedule:
a. Submit a schedule of doors and frames using the same reference numbers for details and openings as indicated on the Contract Drawings.
b. Indicate coordination of glazing frames and stops with glass and glazing requirements.

6. Secure templates from finish hardware supplier for specified hardware and mounting locations.

E. Submit samples.

1. One 6” x 6” of each glass type

2. Glazing tape
F. Certification:

1. Fire rating of glass, doors, frames and glass lite frames

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing / installing / finishing projects of similar size and complexity.

C. Manufacturer shall have been in business for five (5) years providing/installing/finishing projects of similar size and complexity.

D. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid E. Stipulations:

1. Manufacture all labeled frames in strict accordance with the specifications and procedures of Underwriters Laboratories, Inc. (UL).

F. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

1. Agenda for meeting shall include, but not be limited to;

2. Preparation for hardware

3. Electrified hardware, power supply, conduit and wiring G. Miscellaneous criteria:

1. Templates shall be furnished by hardware supplier for preparing shop drawings and for preparing and reinforcing hollow metal work to receive hardware.

2. Where fire-resistance classification is shown or scheduled, provide fire-rated assemblies. a. Identify each door, frame and vision lite with UL labels, indicating applicable fire-rating.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 6
b. Provide approved fill material within door frame at acoustically labeled door/frame assemblies.

3. Fire Rated Door Assemblies: Meet the requirements of CCR Title 24 Part 2, CBC Chapter 7 – Fire Resistant Materials and Construction for the fire resistive ratings indicated, and which are labeled by Warnock Hershey International. Fire doors and frames to comply with UBC 7-2-1997 (UL 10C) positive pressure part 1 and/or part 2 where applicable. a. Temperature Rise Rating: At stairwell enclosures, provide doors which are labeled for a maximum transmitted temperature end point not to exceed 250° above the ambient at the end of 30 minutes of fire exposure.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Store doors and frames at building site under cover. Place units upright on at least 4 inch high wood sills in a manner that will prevent rust and damage.

1. Avoid the use of non-vented plastic or canvas shelters which could create a humidity chamber.

2. If cardboard wrapper on door or frames becomes wet, remove the carton immediately.

3. Provide a space between stacked doors to promote air circulation.

1.7 JOB CONDITIONS
A. Field-verify that all components, substrates, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Wall Construction and finish

2. Hardware supplied by others

3. Hardware preparation and installation

4. Electrified hardware
B. Related Sections include, but are not limited to the following:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 7

1. Division 1

2. Section 08 71 00 – Door Hardware

3. Section 08 80 00 – Glazing
C. Related Documents include, but are not limited to the following:

1. Division 1 Supplementary Conditions

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

C. Preparation and painting of frames and doors
PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer for each product type.

B. Acceptable manufacturers shall be one of the following and as herein listed and in Drawings:

1. Doors, Door frames and Window frames
a. Metal Manufacturing Company, Sacramento, CA, [email protected] 916-922-3484 b. Stiles Custom Metal, Inc., www.hollowmetal.com 209-538-3667 c. Forderer Cornice Works, San Francisco, CA, (415) 431-4100 d. Titan Metal Products, Inc., Sacramento, CA., www.titanmetalproducts.com 916-920-2555 e. Door Components Inc., Fontana, CA, www.doorcomponents.com, 866-989-3667, 909-770-5700 f. Security Metal Products Corp, www.seet.com 310-641-6601

2. Door Lite Assembly Frame & Glazing Compound
a. Anemostat, www.anemostat.com 213-775-7441

3. Door Lite Assembly Frame Glazing
a. TGP, Technical Glass Products, www.tgpamerica.com www.fireglass.com

4. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 8

1. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

C. Refer to drawings, details, and other related specification section whether listed or not.

D. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. General

1. Hot Dip Galvanized Steel Sheets

2. Honeycomb Core Material

3. Polystyrene Core Material

4. Mineral Fiberboard Core Material

5. Shop Applied Primer: Rust-inhibitative enamel or paint, either air drying or baking, suitable as a base for specified finish paints.

B. Doors

1. General:
a. Comply with NAAMM Standards, most current published edition as herein specified. 1) Unless otherwise indicated, provide fire ratings as indicated on the drawings, and as required by building code.
2) Glazing shall be as approved for rated assemblies and in accordance with glazing specifications.
3) Glazing shall be as approved for safety assemblies and in accordance with glazing specifications.

C. Door Frames

1. General:
a. Comply with NAAMM Standards, most current published edition as herein specified. b. Shop assembled where possible, size as scheduled or indicated, gauges as herein specified. c. Except at fire assemblies, furnish and install three rubber silencers for strike jambs of single frames and two for heads of double frames, U.N.O., in hardware groups. d. All glazing stops shall have miter corners as standard requirement. e. Fabricate as "fully & continuously" welded assembly. f. Fabricate with continuous watertight 2” wide nailing flange at jamb and head – exterior side of frame.

2. Comply with NAAMM Standards, most current published edition; a. Hollow metal frames: Refer to standards as herein specified b. Hardware prep for hollow metal frames: Refer to standards as herein specified c. Guide Specifications – Commercial: Refer to standards as herein specified

3. Anchors:
a. Comply with HMMA 861, including, but not limited to Article 2.05 A, B, C. b. Three at jambs, min. and one floor anchor per jamb, typical unless required differently per frame type application.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 9
D. Hardware reinforcement

1. Comply with NAAMM Standards, most current published edition; a. HMMA 830 Hardware Preparation Standard
b. HMMA 861 Guide Specification
E. Glass lites in doors

1. Glazing:
a. Mfgr: TGP, Technical Glass Products, www.tgpamerica.com www.fireglass.com b. Size: Maximum size, refer to frame maximum lite size criteria c. Color: Clear
d. Tempered: Yes
e. Testing: ANSI Z97.1 – 2004
f. Schedule:

Rating: Product: Thk: Description:
1) None Fireglass20 1/4” Impact/safety rated

2. Frame:
a. Mfgr: Anemostat
b. Material: 20ga. cold rolled steel
c. Color: Factory grey primer for field painting – as selected by Architect d. Attachment: Self attaching
e. Profile: Low profile
f. Door thickness:
1) Typical: 1-3/4”
2) LoPro-IS-G: Refer to door schedule for door thickness g. Ratings Schedule: Rating as required, refer to drawings and door schedule.

Rating: Maximum visible lite size
1) 20 min. 3204 sq.in
2) 45/60 min. 2772 sq.in
3) 90 min. 1296 sq.in.
4) 180 min. 100 sq.in.
h. Schedule:

Profile: Product: Size: Glass thickness
1) Rectangular LoPro Refer to drawings 1/4”, 3/16” & 5/16” 2) Custom LoPro-CS Refer to drawings 1/4”, 3/16” & 5/16”

3. Tape:
a. Glazing tape:
1) Mfgr: Anemostat
2) Product: Fire Rated Glazing Tape
3) Series: GT
4) Rating: 20/45/60/90/180 minute
5) Listing: UL, WHI, BS-476.22 & EN-1634
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 10
6) Material:
a) Use thickness as required for frame opening and glass thickness b) Schedule:
i. GT-132: 1/32” thick x 3/8” wide
ii. GT-116: 1/16” thick x 3/8” wide
iii. GT-18: 1/8” thick x 3/8” wide

2.3 OTHER MATERIALS
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the General Contractor subject to the approval of the Architect.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION (comply with HMMA 820, 830) A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

C. Hardware supplier / contractor shall supply hardware templates for preparing shop drawings and for preparing and reinforcing hollow metal work to receive hardware to hollow metal frame and door contractor.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 FABRICATION
A. Fabricate doors, frames, concealed stiffeners, anchors, hardware reinforcement, edge channels, louvers, moldings, stops and vision panel frames from the following commercial qualify carbon steel. (maintain minimum standards per each tested assembly)

1. Hot-rolled steel sheets and strips, pickled and oiled, complying with ASTM A569.

2. Cold-rolled steel sheets, complying with ASTM A366.

3. Galvanized steel sheets, complying with ASTM A526, G90 zinc coating.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 11

4. Inserts, bolts and fasteners shall be standard manufacturer's units, except hot-dip galvanized items to be built into walls, complying with ASTM A153, Class C or D as applicable.

5. Comply with NAAMM Standard, current published edition; a. Guide Specifications – Commercial:
1) Hollow metal frames, Typical: HMMA 861
2) Hollow metal frames, Security: HMMA 862
3) Hollow metal frames, Detention: HMMA 863
4) Hollow metal doors, Acoustical: HMMA 865
b. Manufacturing Standard: MMMA 802
B. Steel doors, door frames and window frames shall be "Machine-Mitered and Full-Welded" joint construction, rigid, neat in appearance and free from defects, warp or buckle.

1. Full welded mitered joints, continuously, grind, dress, and make smooth, flush and invisible.

2. Install Knock-Down Window frames at locations that prohibit built-in place conditions where fully welded window assembly is feasible.

C. Accurately form metal to required size and profiles.

1. Shop-fit and assemble wherever practical

2. Site assembled units shall be of welded construction meeting all requirements of factory assembled units.

3. Construction joints shall be reinforced and machine-mitered at corners.

4. Exposed fasteners shall be provided countersunk pre-fitted holes at through bolting on doors.

5. Concealed fasteners at face of frame and glazing molding stops shall be pre-drilled countersunk or dimpled holes.
a. Supply flat head Phillips machine or Teks screws pre-fitted for field applied glazing putty.

6. Reinforce doors and frames to receive surface-applied hardware, and shall be as follows. a. Drilling and tapping for surface-applied hardware may be done at project site. Door shall have internal reinforcing at all surface-applied hardware. b. Provide drilled holes for door silencers when required by Section 08 71 00 - Door Hardware. c. Hinges; 10 gauge x 1 1/2 inches wide x 6 inches longer than hinge; full perimeter fillet weld at bearing each end.
d. Strike plate clips; 10 ga. x 1 1/2 inches wide x 3 inches long; full perimeter fillet weld at bearing.
e. For Surface-applied closers; 10 gauge x required width and length, secured in both doors and frames whether or not closers are indicated. Spot welded in place. For future and/or required closer.

D. Paint all steel frames:

1. General:
a. Clean steel surfaces of mill scale, rust, oil, grease, dirt and other foreign materials before applying shop primer.
b. Apply pretreatment to clean metal surfaces, using cold phosphate solution (SSPC-PT 2), hot phosphate solution (SSPC-PT 4) or basic zinc chromate-vinyl butyl solution (SSPC-PT3).

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 12
c. Install barrier coating at inside of all frames including the ones to be fully grouted with mortar.

2. Primer:
a. Apply shop primer within time limits recommended by pretreatment manufacturer. b. Apply a smooth primer coat of even consistency to provide a uniform dry film thickness of not less than 2 mils, on all hollow metal surfaces.
1) Door primer surface shall be completely smooth to the touch and visual.

3. Painting:
a. Shop paint 1st. coat when possible
b. Finish painting shall be in accordance with Paint Specification Section 09 90 00. c. Paint frame and doors custom color as directed by Architect.

3.5 INSTALLATION
A. General:

1. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.
a. Installed metal doors, door frames and window lite frames and accessories in accordance with drawings, reviewed Shop Drawings, manufacturer's data, and as specified here. b. Hang with clearance indicated in Section 08 71 00 - Door Hardware. Install in accordance with HMMA 840 and 861.

2. All interior metal frames shall be;
a. Filled with insulating foam at non rated conditions

1. Brace frames to eliminate any potential bowing of frame. b. Filled with mineral wool at rated conditions

3. All exterior metal frames shall be;
a. Painted inside frame with barrier coating.
b. Holes in frame filled, bondo filled, sanded smooth and finished after grouting.

4. Prime coat touch-up;
a. Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touch-up of compatible air-drying primer in accordance with Section 09 90 00.

5. Finish paint frames after installation, refer to Painting Section 09 90 00.

6. Except for frames located at in-place concrete or concrete block which can be installed after wall is placed, place frames prior to construction of enclosing walls and ceilings. a. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set.
1) After wall construction is completed, frames are grouted or filled with appropriate material, remove temporary braces and spreaders leaving surfaces smooth and undamaged.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 13
B. Anchorage:

1. Frame anchors shall be located on each jamb starting 4" from top and 24" on center maximum on down with floor anchor at base. Provide anchors at head not more than 24 inches on center and not less than two per door head.

2. Anchors shall be 14 ga. galvanized steel of size and length or shape required by construction.

3. Anchor to floors:
a. 12 gauge galvanized angles welded to bottom of each door jamb and vertical mullions with two holes in bottom leg for 1/4 inch wedge anchor each.

4. Comply with NAAMM Standard, HMMA 840, current published edition.

C. Install Metal Doors

1. Inspection:
a. Examine door frames and verify that they are of the correct type and have been installed as required for proper hanging of corresponding doors.
1) Correct conditions detrimental to the proper and timely installation of plastic faced wood doors; do not proceed with installation until unsatisfactory conditions have been corrected.

2. Installation:
a. Install doors and fit hardware to doors in accordance with manufacturer's instructions. b. Fit doors to frames and machine for hardware to whatever extent not previously worked at factory as required for proper fit and uniform clearance at each edge. c. Replace doors which have been improperly prepared at factory and which cannot be adjusted without damage to surfaces.
d. Clearances: (Unless otherwise required by testing labeling of rated doors and mfgr. to be different)
1) For non-fire-rated doors provided clearances of;
a) 1/8" at jambs and head
b) 1/8" at meeting stiles for pairs of door
c) 1/2" from bottom of door to top of decorative floor finish or covering. i. Except where threshold is shown or scheduled provided 1/4" clearance from bottom of door to top of threshold.
e. Operation:

1. Re-hang or replace doors which do not swing or operate freely.

2. Replace doors damaged during installation.
f. Folding, Bi-parting, sliding and other specialty door shall be installed in accord with indicated details, reviewed shop drawings and manufacturer’s recommendations. g. Location of finishes and hardware as listed and detailed shall be used as a guide and shall be field verified to achieve a smooth and effortless operation.

3.6 ADJUSTING
A. Hardware adjustment shall be done by others under hardware specifications section.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
STEEL DOORS AND FRAMES 08 11 13 - 14

3.7 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.8 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END SECTION 08 11 13
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 1
SECTION 08 11 16 – INTERIOR ALUMINUM DOORS AND FRAMES
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY
A. Section Includes:

1. Pre-finished aluminum door frames for interior use.

2. Pre-finished aluminum framing systems for interior use.

3. Pre-finished aluminum doors for interior use.

B. Related Sections:

1. Division 01 Section “Sustainable Design Requirements” for additional LEED documentation and requirements.

2. Division 08 Section "Glazing" for glass view panels in interior aluminum doors.

3. Division 08 Section "Aluminum Entrances and Storefront" for glazed aluminum doors and framing used in exterior walls and vestibule enclosures.

4. Division 08 Sections "Flush Wood Doors", "Clad Wood Doors”, and "Stile and Rail Wood Doors" for wood doors used in interior aluminum frames.

5. Division 08 Sections "Door Hardware" and "Access Control Hardware" for door hardware used on interior aluminum doors and frames.

6. Division 26 "Electrical" Sections for electrical connections including conduit and wiring for door controls and operators installed on interior aluminum frames.

7. Division 28 Section "Access Control" for access control devices installed at interior aluminum frame openings and provided as part of a security access system.

C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

1. AAMA 603.8 Performance Requirements and Test Procedures for Pigmented Organic Coatings on Extruded Aluminum.

2. AAMA 607.1 Guide Specification and Inspection Methods for Clear Anodize Finishes for Architectural Aluminum.

3. AAMA 608.1 Guide Specification and Inspections Methods for Electrolytically Deposited Color Anodic Finished for Architectural Aluminum.

4. AAMA 609 & 610-02 Cleaning and Maintenance Guide for Architecturally Finished Aluminum.

5. ASTM B221 Standard Specification for Aluminum and Aluminum-alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.

6. ASTM E90 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 2

7. ASTM E413 Classification of Sound Rating Insulation.

8. NAAMM "Metal Finishes Manual for Architectural and Metal Products”.

9. ANSI/NFPA 80 Standard for Fire Doors and Fire Windows; National Fire Protection Association.

10. NFPA 252 Standard Method of Fire Tests of Door Assemblies.

11. ANSI A117.1 Accessible and Usable Buildings and Facilities.

12. ICC/IBC International Building Code.

1.3 SUBMITTALS
A. Submit under the provisions of Section 01 33 00-Submittal Procedures.

B. Product Data: For each type of product indicated. Include construction details, material descriptions, hardware reinforcements, profiles, anchors, fire-resistance rating, and finishes.

C. Templates: Door hardware supplier is to furnish templates, template reference number and/or physical hardware to the interior aluminum door and frame supplier in order to prepare the doors and frames to receive the finish hardware items.

D. Shop Drawings: Include the following:

1. Frame details for each frame type, including dimensioned profiles and metal thicknesses.

2. Locations of reinforcement and preparations for hardware.

3. Details of each different wall opening condition. Include requirements for steel framing at partitions for fit and securing of frames, partition widths and tolerances, direction of framing members, clips and attachments.

4. Details of anchorages, joints, field splices, and connections.

5. Details of accessories.

6. Details of moldings, removable stops, and glazing.

7. Elevations of each door design.

8. Details of doors, including vertical and horizontal edge details and metal thicknesses.

9. Details of preparations for power, signal, and control systems.

E. Samples for Verification: Provide at the request of architect, prepared Samples as indicated below:

1. Framing Member: 12 inches long.

2. Corner Fabrication: 12-by-12-inch-long, full-size window corner, including full-size sections of extrusions with factory-applied color finish.

3. Aluminum chips in full range manufacturer’s standard finishes for architect’s color selection.

F. Interior Aluminum Door and Frame Schedule: Use same designations indicated on Drawings.

Coordinate with Door Hardware schedule and glazing.

G. Informational Submittals

1. Certificates of Compliance: Submit any product test report or information necessary to indicate compliance with this specification section.

1.4 QUALITY ASSURANCE
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 3
A. Source Limitations: Obtain interior aluminum frames and doors through one source from a single qualified manufacturer.

B. Manufacturer Qualifications: A firm experienced in the manufacturing of interior aluminum framing systems and doors with a minimum five (5) years successful in-service performance providing product similar to those indicated for this project, including pre-engineering and pre- fabricating all components of aluminum framing systems and doors.

C. Installer Qualifications: An experienced installer with a minimum five years (5) experience who has completed aluminum framing systems and door installations similar in material, design, and extent to those indicated for this project and whose work has resulted in construction with a record of successful in-service performance.

D. Aesthetic Effects: Do not modify intended aesthetic effects, as judged solely by Architect, except with Architect’s approval. If modifications are proposed, submit comprehensive explanatory data to Architect for review.

E. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 (neutral pressure at 40" above sill) or UL 10C.

1. Provide labels permanently fastened on each frame or door within size limits established by NFPA and the testing authority.

F. Fire-Rated, Borrowed-Light Frame Assemblies: Assemblies complying with NFPA 80 that are listed and labeled, by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire-protection ratings indicated, based on testing according to NFPA 257. Label each individual glazed lite.

G. Smoke-Control Door Assemblies: Comply with NFPA 105.

H. Pre-Installation Conference: Conduct conference in compliance with requirements in Division 01 Section "Project Meetings" with attendance by representatives of Supplier, Installer, and Contractor to review proper methods and procedures for installing interior aluminum frames and doors and to verify installation of electrical knockout boxes and conduit at frames with electrified or access control hardware.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver interior aluminum frames and doors individually protective wrapped within cartons and marked for the corresponding scheduled opening. Do not bulk pack frames.

B. Inspect frames upon delivery for damage.

1. Repair minor damage to pre-finished products as recommended by manufacturer.

2. Replace frames that cannot be satisfactorily repaired.

C. Store interior aluminum frames and doors at Project site under cover and as near as possible to final installation location. Do not use covering material that will cause discoloration of aluminum finish.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 4

1.6 PROJECT CONDITIONS
A. Field Measurements: Verify actual dimensions of interior aluminum frame openings by field measurements before fabrication and indicate measurements on Shop Drawings submittals.

B. Do not install aluminum frames and doors until area of work has been completely enclosed and interior is protected from the elements.

C. Maintain temperature and humidity in areas of installation within reasonable limits, as close as possible to final occupancy standards. If necessary, provide artificial heating, cooling and ventilation to maintain required environmental conditions.

1.7 WARRANTY
A. Provide manufacturer's written warranty against defects in materials and workmanship upon final completion and acceptance of Work in this section.

1. Warrant framing and door finishes against defects and excessive fading and non- uniformity in color for a period of 5 years.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Frameworks Manufacturing.

2. Raco.

3. Versatrac Frames, a Division of American Door Products Inc.

4. Western Integrated Materials, Inc.

B. Substitutions: Material from alternate interior aluminum framing system and door fabricators will not be accepted on jobsite without prior written and sample approval in accordance with requirements specified in Section 01 25 00 - Substitution and Deviation Procedures and at the discretion of Architect and their designated openings consultant.

2.2 MATERIALS
A. Extruded Aluminum: ASTM B 221 alloy 6063-T5 or alloy and temper required to suit structural and finish requirements.

B. Recycled Content of Aluminum Products: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 50 percent.

C. INTERIOR ALUMINUM FRAMES

1. Provide interior aluminum framing components complying with dimensions, profiles, and relationships to adjoining work of components as indicated on Drawings. Provide frames that are adjustable for partition types and throat openings, or that are fitted to each partition type, City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 5
meeting the throat opening and required clearances per frame manufacturer's recommendations. Reinforce for specified hinges, strikes, and closers.

2. Type I Framing System: Provide frames with the following characteristics:
a. Rectilinear design.
b. 1-1/2 inch face profile, 9/32 inch return.
c. .062 inch rabbet wall thickness.
d. Throat sizes (drywall partition thickness): 3-3/4", 4-7/8".

3. Type II Framing System: Provide frames with the following characteristics:
a. Rectilinear design.
b. 1-1/2 inch face profile.
c. Snap on trim:
1) 1-1/4 inch.
2) 1-1/2 inch.
3) 2 inch.
d. .062 inch rabbet wall thickness.
e. Standard throat sizes (drywall partition thickness): 3-1/2", 3-3/4", 4-5/8", 4-7/8", 5- 1/4", 5- 1/2", 6-1/8" and 7-1/4".
f. Adjustable throat frames expandable from 2-7/8" up to 8-3/8".

4. Glass Trim: Extruded aluminum, not less than 0.062 inch thick, designed for glass thickness indicated with removable snap-in casing trim, glazing stops, and door stops without exposed fasteners.

5. Fire Rated Frames: Fabricate frames in accordance with NFPA80, listed and labeled by a qualified testing agency. Maximum fire rating required is 20 minutes (without hosestream test).

D. INTERIOR ALUMINUM DOORS

1. General: Provide 1-3/4 inch doors of type and design indicated, not less than 0.062 inch thick material.

2. Aluminum Stile & Rail Type Swinging Doors: Door stiles and rails to have tubular design with the following characteristics:
a. Stiles:
1) Wide Stile (6").
b. Rails:
1) 6" Top Rail.
2) 12" Bottom Rail.

3. Snap-in stops with factory applied glazing gaskets for 1/4", 3/8", or 1/2" thick glass.

2.3 ACCESSORIES
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 6
A. Fasteners: Aluminum, nonmagnetic, stainless-steel or other noncorrosive metal fasteners compatible with frames, stops, panels, reinforcement plates, hardware, anchors, and other items being fastened.

B. Door Silencers: Manufacturer's standard continuous mohair, wool pile, or vinyl seals.

C. Glazing Gaskets: Manufacturer's standard extruded or molded plastic, to accommodate glazing thickness indicated.

D. Glazing: Comply with requirements in Section 08 80 00 - Glazing.

E. Hardware: As specified in Section 08 71 00 - Door Hardware.

2.4 FABRICATION
A. FRAME CONSTRUCTION

1. Factory pre-engineer and pre-cut interior aluminum frame components to the greatest extent practical. Linear glazing components fabricated in the field are not allowed. Allow for 2 inches excess vertical length for scribing to suit floor conditions. Face trim to be pre-cut to match jamb lengths. Machine jambs and prepare for hardware, with concealed plates, drilled and tapped as required, fastened in frame with concealed screws.

2. Provide concealed corner reinforcements and alignment clips for precise joints at butt or mitered connections.

3. Hardware Preparation: Factory interior aluminum frames to receive template mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to the Door Hardware Schedule and templates as specified in Division 08 Section, "Door Hardware." a. Reinforce frames to receive surface mounted door hardware. Machine jambs and prepare for hardware, with concealed reinforcement plates, drilled and tapped as required and fastened within frame with concealed screws.
b. Locate hardware as indicated.

4. Fabricate frames for glazing with removable stops to allow glazing replacement without dismantling frame.

5. Fabricate all components to allow secure installation without exposed fasteners.

B. DOOR CONSTRUCTION

1. Factory pre-engineer aluminum doors and components to the greatest extent practical.

2. Hardware Preparation: Factory interior aluminum doors to receive template mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to the Door Hardware Schedule and templates as specified in Section 08 71 00 - Door Hardware. a. Reinforce doors to receive surface mounted door hardware. Machine and prepare for hardware, with concealed reinforcement plates, drilled and tapped as required and fastened within door with concealed screws.
b. Locate hardware as indicated.

3. Clearances for Non-Fire-Rated Door Frames: Not more than 1/8 inch at jambs and heads, not more than 1/4 inch between pairs of doors. Not more than 3/4 inch at bottom.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 7

4. Fabricate kits for glazing with removable stops to allow glazing replacement without dismantling.

2.5 ALUMINUM FINISHES
A. General: Comply with NAAMM’s "Metal Finishes Manual for Architectural and Metal Products' for recommendations for apply and designated finishes. Exposed surfaces to be free of scratches and other serious blemishes.

B. Factory finish extruded frame components so that any part exposed to view upon completion of installation will be uniform in finish and color.

C. Polyester Finish: Comply with AAMA 603.8; multiple-stage electrostatically applied thermoset polyester finish, baked to assure hardness.

1. Color: Custom paint color to match architect sample.

2. Color: Manufacturer’s standard bronze.

3. Color: Manufacturer’s standard gray.

4. Color: Manufacturer’s standard black.

5. Color: Manufacturer’s standard white.

D. Clear anodic coating: Comply with AAMA 607.1.

1. Class 2, AAM12C22A31 clear anodized coating, 0.4-.07 mill thickness minimum.

E. Color anodic coating: Comply with AAMA 608.1.

1. Class 2, AAM12C22A34 color coating electrolytically deposited, 0.4-0.7 mill thickness minimum. a. Color: Bronze anodized.
b. Color: Black anodized.

2. Class 2, AAM12C22A44 color coating electrolytically deposited, 0.4-0.7 mill thickness minimum. a. Color: Bronze anodized.
b. Color: Black anodized.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Verify wall thickness does not exceed standard tolerances allowed by specified frame throat sizes.

C. General Contractor to verify the accuracy of dimensions given to frame and door manufacturer for pre-cut openings.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
INTERIOR ALUMINUM DOORS AND FRAMES 08 11 16 - 8
A. General: Install and set interior aluminum frames plumb, rigid, properly aligned, and securely fastened in place; comply with Drawings and manufacturer's written instructions.

B. Install frame components in the longest possible lengths with no component less than 48 inches.

1. Fasten to suspended ceiling grid at 48 inches on center maximum, using #6 sheet metal screws or other fasteners approved by frame manufacturer.

2. Use concealed installation clips to produce tightly fitted and aligned splices and connections.

3. Secure clips to extruded main-frame components and not to snap-in or trim members.

4. Do not use screws or other fasteners exposed to view when installation is complete.

3.3 ADJUSTING AND CLEANING
A. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave work in complete and proper operating condition.

B. Clean exposed frame surfaces promptly after installation, using cleaning methods recommended by frame manufacturer and according to AMMA 609 & 610.

C. Touch up marred areas so that touch up is not visible from a distance of 48 inches. Remove and replace frames that cannot be satisfactorily repaired.

3.4 PROTECTION
A. Provide protection as required to assure that frames will be without damage or deterioration upon substantial completion of the project.

END OF SECTION 08 11 16
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
WOOD DOORS 08 14 00 - 1
SECTION 08 14 00 – WOOD DOORS
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Door schedule:
a. Interior
b. Door vision panel frames

2. Glass:
a. Door lites:
1) As herein specified
2) As provided by door manufacturer

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American National Standards Institute (ANSI), www.ansi.org

1. ANSI/WDMA I.S.1-A SERIES (Latest edition) Industry Standard for flush wood doors E. American Society For Testing and Materials (ASTM), www.astm.org

1. ASTM E152 - Methods of fire tests for wood doors

2. ASTM F476 - Standard Test Methods for Security of Swinging Door Assemblies (to Standard Grade 30)
F. Forest Stewardship Council (FSC) www.fsc.org
G. International Code Council Evaluation Service (ICC-ES), www.icc-es.org City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
WOOD DOORS 08 14 00 - 2
H. National Fire Protection Agency (NFPA), www.nfpa.org

1. NFPA 80 – Labeled Protective assemblies

2. NFPA 105 – Installation of Smoke and Draft Control of 20 minute labeled door assemblies

3. NFPA 252 – Smoke and Draft Control of 20 minute labeled door assemblies

4. NFPA 257 – Glazing in Fire Rated Door Assemblies

5. NFPA 288 - Floor Fire Door Assemblies
I. Warnock-Hersey International (WH)
J. Window and Door Manufacturers Association, (WDMA), www.wdma.org

1. WDMA Quality Standard: I.S.1A "Architectural Wood Flush Doors", of Window and Door Manufacturers Association (WDMA).

2. WDMA Quality Standard: I.S.1A "Architectural Wood Flush Doors", of Window and Door Manufacturers Association (WDMA).

K. Woodwork Institute, (WI), www.woodworkinstitute.com.

1. WI Manual of Millwork, Section 12, Architectural Flush Wood Doors L. Underwriters Laboratory (UL), www.ul.com

1.3 PERFORMANCE
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Door / Frame
Assembly:

Rated
Assembly
General Comply UL 10A, 10C, 14B, 14C
& WDMA I.S.1A, Item
C-8
Positive Pressure “S” Label compliance – (After 5 minutes into test, the neutral pressure plane should be at
40” Temperature rise at 250 degrees)

UL, CBC
Smoke & Draft Control Comply UL 1784 & WDMA
I.S.1A, Item P-3
Fire Rated Assembly Comply CBC 711.8, 715.4 &
table 715.4 & WDMA
I.S.1A, Item P-3
Fire Rated Corridors and
Smoke Barriers / Smoke
Control
Comply CBC 715.4.3 &
715.4.3.1
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
WOOD DOORS 08 14 00 - 3
Fire Rated Assemblies,
Exit Enclosures & Exit
Passageways
Comply CBC 715.4.4 &
715.4.4.1
Glazing in Doors Comply CBC 715.4.4.1
Labeling of Protective
Openings
Comply CBC 715.4.5 &
715.4.5.1 & 715.4.5.3
Door
Construction
Construction
Performance Testing
Comply WDMA IS 1A
Construction type Heavy Duty construction
Dimensional Tolerances Width:
+/-1/16” not prefit
+/-1/32” factory prefit
Height:: +/-1/16”
Thickness: +/-1/16”
WDMA I.S.1A, Item P3
Hardware matching
tolerances
Comply
Vertical & Horizontal
Edge material
Wood veneer to match face of door WDMA I.S.1A, Item C4 & P-1 Vertical & Horizontal
Edge bonding
Bonded assembly WDMA I.S.1A, Item C5
Adhesive Type II, minimum WDMA I.S.1A, Item C6
Core and Wood Blocking Wood veneer Particleboard Core: PC-5 & HB-3 & HB-8
Wood veneer Fire Resistant Core: FD45/60/90-5 & HB-3 & HB-8 WDMA I.S.1A, Item C10
Wood veneer HPDL Particleboard Core: PC5 & HB-3 & HB-8 Wood veneer HPDL Fire Resistant
Composite Core: FD-45/60/90-5 & HB-3 &
HB-8
WDMA I.S.1A, Item C11
Face Veneer: Grade: Transparent Finish Premium Grade Door: Veneer for Transparent finish
• Veneer is required to be of sufficient
thickness (minimum 1/50” at 12% MC)
to preclude sand-through, showthrough of core, and glue bleed. • UV set sealers applied twice and sanded
in between
• Finish coat applied last
• Protective peel off film applied for
protection
WDMA I.S.1A, Item A8 & C-1
WI – Woodwork
Institute
Grade: Designation Grade A: (All species except as herein listed) • The Veneer shall be smooth, tight-cut
and full-length.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
WOOD DOORS 08 14 00 - 4
• When the face consists of more than
one Veneer component or piece, the
edge shall appear parallel and be edge
matched.
• Species specified for natural color will
allow color contrasts, but must be book
matched, unless otherwise specified.
• The components of plain-sliced (flatcut) will be book matched, unless otherwise specified with a running,
balanced, or center matched
arrangement.
• Unless otherwise specified, components
in plain-sliced faces will have a matching
arrangement selected by the
manufacturer.
• Plain-sliced faces will consist of two or
more components with no component
less than 152mm (6 inches) wide except
for outside components which may be
less than 152mm (6 inches) to allow for
certain types of matching or panel edge
trim loss.
• No plain-sliced components will have a
split heart.
• Not full quarter-cut is allowed in plainsliced faces. • The width of any single component in
quarter-cut, rift-cut or comb grain faces
shall not be less than 76mm (3 inches)
except for outside components which
may be less than 76mm (3 inches) to
allow for certain types of matching or
door edge trim loss.

Grade B: White Maple
Matching
Spliced veneers
Running & Continuous WDMA I.S.1A, Item A5
Matching
• Plain Sliced (flat cut): Book match
• Quarter Cut Sliced: Slip match
• Rift Cut: Center match
WDMA
Appearance of doors in
pairs - single
Pair Match WDMA I.S.1A, Item A6
Appearance of pairs of
doors in sets
Set Match
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 1
SECTION 08 31 00 – ACCESS DOORS AND PANELS
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Providing and installing rated and/or non-rated access doors at all ceiling and wall locations for access to, but not limited to;
a. Plumbing and fire sprinkler valves and such.
b. Mechanical fire damper controls, dampers, etc.

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. Underwriters Laboratories (UL), www.ul.com

1. UL 10A, UL 14B and UL 14C

2. UL 1784 – Smoke and Draft control
E. National Fire Protection Agency (NFPA), www.nfpa.org a. NFPA 80 Labeled Protective assemblies
b. NFPA 105 Installation of Smoke and Draft Control of 20 minute labeled door assemblies
c. NFPA 252 Smoke and Draft Control of 20 minute labeled door assemblies d. NFPA 257 Glazing in Fire Rated Door Assemblies
e. NFPA 288 Floor Fire Door Assemblies
F. Provide door assembly with “S” label
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 2

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Access
Panels
Fire Ratings Where fire-resistance classification is
shown or scheduled, provide firerated metal door and frames.

Identify each door and frame with UL
Labels, indicating applicable firerating.

UL
Floor Fire Door
Assemblies
CBC, Section 715.4.1, 715.4.2,
715.4.3, 715.4.4, 715.4.5,
715.4.6.2, 715.4.8, 715.4.8.1,
715.4.8.2 & 715.4.8.3
Fire Door and
Shutter Assemblies
CBC, Section 715.4
Fire Door and Fire
Shutter Fire
Protection Ratings
CBC, Table 715.4
Door Assemblies in
Corridors and Smoke
Barriers
CBC, Section 715.4.3
Smoke and Draft
Control
CBC, Section 715.4.3.1 &
715.4.6.3
Doors in Exit
Enclosures and Exit
Passage ways
CBC, section 715.4.4
Labeled Protective
Assemblies
CBC, Section 715.4.6,
715.4.6.1 & 715.4.6.4
Fire Door Labeling
Requirements
CBC, Section 715.4.6.1
Labeled
doors
and
glazing:

Fire Door Labeling
Requirements
Comply
CBC, Section 715.4.6.1
Refer to drawings and as herein specified

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 3
B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
D. Submit Manufacturer’s data and shop drawings.

1. Indicate construction, configuration

2. Confirm and list all sizes and locations

3. Submit manufacturer's literature

4. Submit schedule of doors and frames using the same reference numbers for details and openings as indicated on the Contract Drawings.

E. Submit samples.

1. Finishes
F. Site mock-up, refer to “Mock-Up” heading.

G. Certification:

1. Label Construction Certification:
a. For door assemblies required to be fire-rated and exceeding sizes of tested assemblies, submit manufacturer's certification that each door and frame assembly has been constructed to conform to design, materials and construction equivalent to requirements for labeled construction.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing / installing / finishing projects of similar size and complexity.

C. Manufacturer shall have been in business for five (5) years providing/installing/finishing projects of similar size and complexity.

D. Stipulations:

1. Manufacture all labeled frames in strict accordance with the specifications and procedures of Underwriters Laboratories, Inc. (UL).

E. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

Agenda for meeting shall include, but not be limited to;

1. Locations of access doors

2. Size of doors

3. Items being accessed

4. Rated conditions

5. General Contractor shall request meeting 5 days in advance of construction.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 4
F. Miscellaneous criteria:

1. Access doors at rated conditions shall be UL Labeled.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Store access doors at building site under cover.

1.7 JOB CONDITIONS
A. Field-verify that all components, backing, etc. by others are installed correctly to proceed with installation of products as herein specified.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Wall and Ceiling Framing

2. Wall and Ceiling Sheathing

3. Wall and Ceiling Finishing

4. Mechanical, Plumbing and Electrical Equipment and components requiring access.

B. Related Sections include, but are not limited to the following:

1. Division 1

2. Section 05 40 00 – Cold-Formed Steel Framing

3. Section 06 10 00 – Rough Carpentry

4. Section 09 22 16 – Non-Structural Metal Framing

5. Section 09 29 00 – Gypsum Board & Sheathing Substrates

6. Section 09 30 00 – Tile and Stone

7. Section 09 90 00 – Paintings and Coatings
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 5

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding operation of the equipment.

2. Complete instructions regarding maintenance of the equipment, materials, finishes, etc.

3. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer for each product type.

B. Acceptable manufacturers shall be one of the following and as herein listed and in Drawings:

1. Acudor Access Doors, (201) 857 – 1800 www.acudor.com

2. Babcock-Davis, www.babcock-davis.com

3. Elmdor, www.elmdor.com

4. JL Industries, www.buyjlindustriesonline.com

5. KARP Associates, Inc. 800.888-4212, www.karpinc.com

6. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. Schedule

1. General
a. Manufacturer: Acudor
b. Construction: (unless noted otherwise on specific door) City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 6
1) Door and Trim: 14 ga. steel or aluminum, see specific model 2) Return Frame: 16 ga. steel or aluminum, see specific model 3) Insulation
a) If applicable: 1-7/8" thick mineral wool between 22 ga. steel 4) Hinges: Continuous concealed piano with 90 deg. min. opening. 5) Latches/Locks: Mortise cylinder typ. & Self-latching at rated doors. 6) Automatic Panel Closer: At all doors
7) Inside Panel Release: At all doors
8) Finish:
a) Steel: Baked prime coat final color as selected by Architect. b) Aluminum: Mill finish

2. Applications:
a. WALLS:
1) Schedule:
a) Tile:
i. Schedule:
a. Flush recessed with taping flange and cement board insert for tile finish
i). Application: Typical, uno.
ii). Model: Bauco Plus II, Tile access door
iii). Finish: Factory primed
iv). Options: Cement board insert for tile finish.
v). Size: General
a. 12” x 12”
b. Required size per code, agency having jurisdiction and as required to provide full access to valves, equipment, dampers, etc.
vi). Criteria:
a. 12” x 12” for access to valves
b) Security: (flush,exposed trim)
i. Model: SD-6000
a. Size:
i). General:
a. Required size per code, agency having jurisdiction and as required to provide full access to valves, equipment, dampers, etc.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 7
b. Submit available sizes for selection by Architect.
ii). Criteria:
a. 12” x 12” for access to valves
b. CEILINGS AND SOFFITS:
1) Schedule:
a) Flush recessed with taping flange and gypsum board insert i. Application: Typical, uno.
ii. Model: Bauco Plus, Drywall access door
iii. Finish: Factory primed
iv. Options: Drywall insert for tile finish.
a. Match wall gypsum board type
v. Size: General
a. 24” x 24”
b. Required size per code, agency having jurisdiction and as required to provide full access to valves, equipment, dampers, etc. vi. Criteria:
a. 24 x 36 where physical access by a person is required thru door c. SECURITY: (flush,exposed trim)
1) Model: SD-6000
d. VALVE BOXES:
1) Model:
a) Non Rated: ARVE
b) Rated: N/A
2) Finish: Stainless Steel

2.3 ANCHORAGE
A. Frame anchors shall be located & installed per by manufacturer’s recommendations.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 8

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 INSTALLATION
A. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

B. Installed Access Doors and frames and accessories in accordance with reviewed Shop Drawings and manufacturer's data, and as specified here.

C. Prime coat touch-up; Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touch-up of compatible air-drying primer.

3.5 ADJUSTING
A. Test operation of equipment, components, etc. and adjust as needed to produce fully functioning units that comply with requirements.

3.6 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.7 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 9
C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the District.

F. After completion of work in this, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 08 31 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACCESS DOORS AND PANELS 08 31 00 - 10

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 1
SECTION 08 41 13 – ENTRANCES, WINDOW WALLS, STOREFRONTS AND CURTAIN WALLS PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Window wall systems:
a. Storefront:

2. Doors:
a. Aluminum Storefront Doors

3. Flashing/Accessories:
a. Coordinate with Section 07 62 00 – Sheet Metal Flashing and Trim. b. Sill Extension/Stool:
1) Aluminum with watertight end dams
a) Extruded when an accessory to specified system.
2) Fastening clip

4. Glazing:
a. Provide for and install glass and glazing supplied under Section 08 80 00

5. Hardware:
a. Provide and prepare for Finish Hardware supplied under Section 08 71 00, unless noted otherwise to be supplied under this specification.

6. Accessories/Specialty Items:
a. Provide and install fasteners, weather-stripping, sealant and other necessary components. b. Brake shape transition component to be installed between glass and end of interior walls. c. Integral steel reinforcing at window mullions.
d. Sealants

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 2
B. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

C. Title 24, Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
D. Aluminum Association (AA) www.aluminum.org

1. Aluminum Standards and Data.

2. Specifications for Aluminum Structures.

3. Designation System for Aluminum Finishes.

4. Standards for Anodized Architectural Aluminum.

E. American Architectural Manufacturers Association (AAMA) www.aamanet.org

1. AAMA 101 Aluminum, Poly(Vinyl Chloride) (PVC) and Wood Windows and Glass Doors

2. AAMA 502 Specification for Field Testing of Windows and Sliding Glass Doors

3. AAMA 503 Voluntary Specification for Field Testing of Newly Installed Storefronts, Curtain Walls and Sloped Glazing Systems

4. AAMA 605.2 High Performance Organic Coatings on Architectural Extrusions and Panels

5. AAMA 1302.5 Forced Entry Resistance

6. AAMA 1502.7 Condensation Resistance Factor

7. AAMA 1503.1 Thermal Transmittance and Condensation Resistance of Windows, Doors and Glazed Wall Sections
F. American Institute of Steel Construction (AISC) www.aisc.org

1. Manual for Steel Construction
G. American Iron and Steel Institute (AISI) www.steel.org

1. Cold Formed Steel Design Manual
H. American National Standards Institute (ANSI) www.ansi.org

1. ANSI Z97.1 Performance Specifications and Methods of Test for Safety Glazing Materials Used in Buildings.

I. American Society For Testing and Materials (ASTM), www.astm.org

1. ASTM A36 Standard Specification for Structural Steel

2. ASTM A123 Zinc Coating on Fabricated Products.

3. ASTM A165 Standard Specification for Electrodeposited coatings of Cadmium on Steel.

4. ASTM B633 Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel (replaced A164)

5. ASTM C509 Standard Specification for Cellular Elastomeric Preformed Gasket and Sealing Material

6. ASTM C864 Standard Specification for Dense Elastomeric Compression Seal Caskets, Setting Blocks and Spacers

7. ASTM C920 Standard Specification for Elastomeric Joint Sealants

8. ASTM C1036 Standard Specification for Flat Glass
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 3

9. ASTM C1048 Standard Specification for Heat Treated Flat Glass

10. ASTM C1193 Standard Guide for use of Elastomeric Joint Sealants

11. ASTM D659 Evaluating Degree Of Chalking Of Exterior Paints

12. ASTM D773 Seal Durability of Sealed Insulating Glass Units

13. ASTM D774 Sealed Insulating Glass Units

14. ASTM E28 Softening Point Of Resins Derived From Naval Stores By Ring And Ball Apparatus

15. ASTM E283 Rate Of Air Leakage Through Exterior Windows, Curtain Walls, And Doors Under Specified Pressure Differences Across The Specimen

16. ASTM E283 Static Air

17. ASTM E330 Structural Performance Of Exterior Windows, Doors, Skylights And Curtain Walls By Uniform Static Air Pressure Difference

18. ASTM E331 Static Water

19. ASTM E546 Frost Point of Sealed Insulating Glass Units

20. ASTM E1105 Standard Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors and Curtain Walls by Uniform or Cyclic Static Air Pressure Differential.

J. American Welding Society (AWS), www.aws.org

1. AWS 01.0 Structural Welding Code
K. Consumer Product Safety Commission (CPSC) www.cpsc.gov L. Flat Glass Marketing Association (FGMA), www.glasswebsite.com

1. Glazing Manual.

2. Sealant Manual.

M. Glass Association of North America (GANA) www.glasswebsite.com N. International Code Council (ICC), www.iccsafe.org

1. ICC – Evaluation Service

2. ICC ES: ER-4780 Metal Fasteners

3. ICC ES: ESR-2427 Concrete Anchors
O. II Evaluation Service National Fenestration Rating Council, NFRC, www.nfrc.com P. National Glass Association (NGA), www.glass.org
Q. Storefront manufacturer’s written instruction manuals

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 4
Item Name of Test Performance Testing Std.

Aluminum Recycled
Content
45% minimum Third party
confirmation
Air infiltration Not to exceed 0.06 CFM. Per sq. ft. of fixed area at

6.24 PSF
ASTM E-283
Water
infiltrationCurtain Wall
No water at 12psf AAMA-501 /
ASTM E331
Aluminum
Window System
Water
infiltrationStorefront
No water at 8 psf AAMA-501 /
ASTM E331
Design Criteria Wind Loading Comply CBC Section 1609
Glazing Refer to Section 08 80 00
Doors - Single Air infiltration Not to exceed 0.50 CFM per linear foot of perimeter crack at 6.24 PSF pressure differential
ASTM E283 for
single doors
Doors - Double Air infiltration Not to exceed 1.00 CFM per linear foot of perimeter crack at 1.567 PSF pressure differential
ASTM E283
Wind exposure Refer to Structural drawings for Exposure Category
Building Code,
ASCE 7-16
Design Wind
Pressure
Per storefront window manufacturer and
structural engineer stamping the shop drawings
Building Code,
ASCE 7-16
ASTM E330
System Design
Criteria
Min. basic wind
speed
Refer to Structural drawings for Wind Speed (“V”) Building Code, ASCE 7-16
ASTM E330
Fasteners Types and
design
Self drilling structural fasteners ICC Evaluation
Service, ER-4780
Concrete expansion anchors ICC Evaluation
Service, ESR-2427
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 5
Normal to the plane of the wall vertical deflection
of framing members at design pressure shall
• not exceed L/175 of span length or ¾”
per individual pane of glass
AAMA TIR-A11-
1996 or most
current adopted
edition
Normal to the plane of the wall horizontal
deflection of framing members at design pressure
shall not exceed L/360 of span length or 1/8”
maximum, whichever is less. Door head shall not
exceed L/360 at 1/16” maximum
In the plane of the wall deflection of framing
members when carrying their full design deadload
shall not reduce the glass or panel bite below 75%
of the design dimension, and shall not reduce the
glass or panel edge clearance below 25% of the
design dimension or 1/8”, whichever is greater.

Restrict deflection further if required for proper
assembly and fit of components.

At connection points of framing members to
anchors: Anchor deflection in any direction shall
not exceed 1/16”.

Stresses must take into account interaction and
shall not exceed the allowable values established
by the specifications listed under References. In
no case shall allowable values exceed the yield
stress.

Deflection and
stress design
At one and one-half times design pressure,
permanent deflections of framing members must
not exceed 1/1000 of span length, and
components must not experience failure or gross
permanent distortion. At connection points of
framing members to anchors, anchor deflection in
any direction shall not exceed 1/8” and permanent
set shall not exceed 1/16”.

Thermal Design Provide for free and noiseless vertical and horizontal thermal movement of component
parts, for an ambient temperature range of 20ºF
to 180ºF. Buckling, opening of joints, glass
brakeage, undue stress on fasteners, vibration
harmonics, wind whistles, failure of sealants or any
other detrimental effects due to the thermal
movement of component parts will not be
permitted. Fabrication and erection procedures
shall take into account the ambient temperature
range at the time of the respective operations
Window / Door
System
Seismic Design • The system and its attachments to the
structure shall comply with the seismic
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 6
lateral force requirements established by
the applicable building code and the
limitations described below and herein.
• No failure or deterioration of any kind
may occur when the system is displaced
in the amount corresponding to the
maximum allowable story drift as
indicated on drawings.
• At twice the above displacement, wedge
gaskets may disengage and perimeter
weather seals may experience adhesive
or cohesive failure, but no other failure or
deterioration of any kind may occur.
• Glass contact with the system framing
members may not occur during either
displacement.
• Story drift, refer to also to structural
drawings
Aluminum Finish,
U.N.O.

Type Kynar 500 Finish:

Color: Custom Standard color as selected by
Architect
Class: Class 1
Product: Fluropon 70% Kynar 500 or Hylar 5000
AAMA 605.2
Hardware- Hand
Activated
Operation Comply CBC 1133B,
1133B.2 &
1133B.2.5.2
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

D. Construction Testing:

Item Name of Test Performance Testing Std.

Storefront assembly Water infiltration;
Perform testing as
herein specified in Part 3
– Execution
No water at 8psf ASTM E1105
Procedure B
Sill can assembly Water infiltration;
Perform testing as
herein specified in Part 3
– Execution
No water leakage AAMA 511
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 7
Threshold assembly Water infiltration;
Perform testing as
herein specified in Part 3
– Execution
No water leakage ASTM E1105
Procedure B
E. Construction Testing / Inspection by others:

Item Name of Test Performance Results By Whom
System
installation
General compliance with
manufacturers written installation
instructions and warranty criteria
Comply Authorized window
manufacturer representative
F. Construction Monitoring/Observations by others:

Item Name of Test Performance Results By Whom
Aluminum Const. Waste
Management
Comply Refer to Division 1 for construction waste
management and disposal/recycling
requirements

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements.

D. Submit Manufacturer’s data and shop drawings.

1. Data:
a. Submit manufacturer’s data for all components.
b. Schedule of all materials including fasteners, anchors, sealants, primers, back-up materials, tapes, gaskets, separators, and related items including the location where each material is to be used, methods of application, special instructions, cross-references to the shop drawings, and explanatory details as required to insure and appraise the complete application of all sealants. c. Detailed instruction for the installation and reglazing of glass units including explanatory details indicating the sequence of installation, method of installation for all materials, location of specific items and any special instructions as may be required.
d. In addition to complying with pertinent regulations of governmental agencies having jurisdiction.

Submit ICC report certifying the following compliance with ASTM standards herein listed. e. Precautionary instructions which will prevent damage to and prolong the life of the system components.
f. Detailed instructions for cleaning the various materials, including methods and acceptable cleaning products, as well as those which should not be used. g. Instructions for the removal and replacement of glazing materials.

2. Design calculations:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 8
a. Prepare and submit (with shop drawings) structural calculations for all work of this Section, including mock-up. Comply with current design rules of the Aluminum Association, AISC, AISI, and ACI. Include analysis for wind, dead load and seismic load on framing members and anchors.

Show section property computations for framing members and submit full-size die drawings. 1) Existing test reports shall not be an acceptable substitute for calculations. 2) In no case shall glass be considered as a lateral brace for framing members. 3) Anchor clips with slotted holes shall be calculated in the most extended conditions. 4) Calculations shall dimensionally limit the stacking of shims in regard to bending stresses in bolts, clips, etc.
5) Calculations shall be signed and sealed by a registered licensed structural engineer in the State of California.
6) In addition, provide the following:
a) Cross-references to the shop drawings.
b) Certification that the responsible engineer has reviewed the shop drawings and that the structural performance requirements of this specification have been met and properly interpreted on the shop drawings.
i. Certification shall be by letter to the Owner and by engineer’s signature on shop drawings.
7) Each specific manufacturer's Storefront, Window Wall and Curtain Wall Systems may require additional internal steel reinforcing which is integral to their specific system and provided as a component of their specific system.
a) This reinforcing shall be furnished under this section of Work and completely detailed and included in shop drawings.
a. Submittal to be signed & stamped by a California Licensed Structural Engineer. b. Indicate all steel reinforcing to be replaced in mullions by storefront manufacturer per storefront manufacturer’s design requirements.
c. Submit wind loads and deflection calculations that prove frame systems shall support and resist listed loads required by this specification.
d. Wind resistance loads and deflection maximums.
e. Water resistance test standards listed.
f. Provide test reports from AAMA accredited laboratories certifying the performance.

3. Shop drawings:
a. Submit a detailed diagram to the glass manufacturer indicating how his product will be used in the system, as well as written information describing application and/or installation techniques, wind load, wall and building movement, magnitude of thermal expansion, blocking and sealing and any other procedures, operations or exposures which may affect the performance of his product.
1) Glass manufacturer shall review and approve in writing, this submittal for responsible use of his product relative to the specific application based on the information supplied City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 9
therein, and shall note on the submittal any procedures he believes will not allow his product to perform.
2) Review of this submittal by the manufacturer shall not relieve the General Contractor from responsibility for the performance of the system.
3) Submit elevation drawings and sections for all windows and incorporate architectural reference for window types and details in shop drawings.
4) Coordinate with Section 08 80 00 - Glazing.
b. Provide and incorporate in the shop drawings data indicating pertinent dimensioning, general construction, steel reinforcing, anchorage methods and locations, slab edge attachment, hardware locations and job specific details (manufacturer’s standard details not acceptable). c. Details showing journey techniques, provision for horizontal and vertical expansion, glass and metal thicknesses, framing and anchor member profiles.
d. Identify all materials, including adjacent materials and substrates. e. Show relative layout of all adjacent walls, beams, columns and slabs, all correctly dimensioned to each other and grid lines.
f. Dimension position of glass edge relative to face of frame, channel and face of stud. g. Include provisions for containing and draining to the exterior any water which accesses window internal cavities.
h. Indicate and specifically note any deviations from contract drawings and specifications. i. Hardware mounting heights and indication of coordination with hardware specified in Section 08 71 00 – Door Hardware.
j. All related flashing, bituminous membrane and vapor / moisture barrier membrane. k. Include all steel reinforcing to be installed integral to mullions. l. Submit shop drawings and any other pertinent data to the manufacturer of the proposed sealant for his use in preparing a written recommendation for the proper, specific material for each application. The written recommendations shall be provided with the shop drawings when submitted.

E. Submit samples

1. The following samples shall be submitted for review, sized to provide a true representation of color, flatness, texture and workmanship, properly identified with labels and in quantities to be determined by the Owner:
a. Aluminum, extruded and / or sheet, with specified finish. b. Cured sealants for color selection and manufacturer’s data sheets. c. All door and frame metal, with specified finish.
d. All flashing metal, with finish to match frame finish.

F. Submit Warranty

1. Submit in a form acceptable to the Owner, a warranty to be executed by an authorized officer of the subcontractor, subject to the conditions herein set forth.

G. Certification:

1. Provide written certification that the following materials conform to the specifications, including the responsibility for ensuring that all items required for the complete and proper City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 10
functioning installation are included, even though not specifically indicated herein, and at no additional cost to the Owner:
a. Aluminum alloys and finishes (including test reports for anodic finish). b. Steel alloys and finishes.
c. Sealants.
d. Glass.
e. Glazing Materials.
f. Fasteners.
g. Window and door hardware.
h. Recycled content of aluminum

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer shall have been in business for five (5) years providing / finishing similar size projects and complexity.

C. Manufacturer shall have been in business for ten (10) years providing/installing/finishing similar size projects and complexity.

D. Test reports shall be accompanied by the window manufacturer’s letter of certification stating that the tested window meets or exceeds the referenced criteria for the appropriate ANSI/AAMA 101 window type.

E. Perform water testing as herein specified and witnessed by Owner or Architect.

F. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid.

G. Stipulations:

1. General Contractor’s Responsibilities:
a. The responsibility for the system is totally that all designs and resolutions proposed in the shop drawings, calculations and related documentation and certification must be demonstrated, not only in the test procedure but also throughout the warranty periods herein specified. No compensation for omission and errors on the part of the Subcontractor in the execution of this contract will be awarded.
b. Perform any actions required to fulfill the intent of this specification even though not specifically called for in this document. Included in this responsibility are instances of overlapping (or shared) duties with other sections of the project specification, in which case the General Contractor must coordinate and insure that all materials, labor, etc., are furnished to the extent required for completing the installed system.
c. Design and Engineering of entire window and door system, and related flashings. d. Submit written notification of any deficiencies or discrepancies that would affect the proper or timely installation of the work in this section. Obtain written authorization for any modification to the system caused by deficiencies, discrepancies, or other conflicts with approved documents.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 11
e. Advise Owner where supplemental bracing of beams may be required if system requires bracing to bottom flange of beams, etc. This notification must occur prior to the fabrication of the entrance, storefront and window system and the structural steel framing members. f. Coordinate and verify, by measurement at the jobsite, lines, location, details and dimensions affecting his work.
g. Compliance with the codes and regulations of all governing agencies having jurisdiction. h. Coordinate hardware with requirements and products specified in Section 08 71 00 - Door Hardware.

H. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

1. Agenda for meeting shall include, but not be limited to; a. Review areas of potential interference and conflicts, and coordinate layout, sequencing, and support provisions for interfacing work.
b. At meeting, the attendees shall review the installation procedures and assemble & install an actual sample window installation, including moisture barrier, kraft paper, bituminous waterproof sheet flashing, metal flashing, and cementitious backer board. 1) General Contractor shall provide all materials, pieces, parts, tools and labor to install sample.
a) The purpose of the sample is to insure understanding of the system, the related parts and the sequencing.
b) The sample shall not be part of the finished complete installation, and shall be removed as directed by the Owner.
c. Coordinate sealants used in window system with those specified and used at window system perimeter at cementitious backer board, stone veneer, plaster, concrete tilt-up and steel door frames, to insure complete compliance with and compatibility of the sealants and all the systems and products.

2. Attendees recommended for meeting are;
a. General Contractor, Owner, Architect, Window Consultant, System installer, installers of other work including door, metal support systems, wall substrates and finishes, flashing, moisture barrier, sealants and electrical work.

I. Manufacturer’s Representative: Make arrangements necessary to have a representative of the window manufacturer on-site periodically during installation of window wall systems to review installation procedures and installed windows.

1. Sheet membrane:
a. Make arrangements necessary to have a representative of the sheet membrane manufacturer onsite periodically during installation of waterproof membrane at window openings to review installation procedures prior to installing windows.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 12
b. Manufacturer’s representative shall review and advise in writing if they find anything in their general observation that appears to not meet manufacturer’s written instructions and/or not in accordance with warranty criteria.
1) Written Observation review shall be sent to the Architect by the manufacturer’s representative.
2) Observation by window manufacturer does not constitute an inspection and/or supervision of installation which is the responsibility of installer and General Contractor.

J. Miscellaneous criteria:

1. System
a. The system shall be provided in accordance with the drawings, approved shop drawings, test reports, product data and submittals.
b. System proposed by the General Contractor must be equal to or better in design, performance and material standards than as described on the drawings and specified in this specification. c. In addition to meeting the required design, performance and material criteria, the system must also:
1) Incorporate the “pressure equalization” concept, and provide details on drawings. 2) Have a positive method of preventing rotation of horizontal members without restricting thermal movement.
3) Allow for drainage to the exterior through the systems and to weeps and weep tubes. 4) Provide for the replacement of glazed materials from the exterior without modification of the system or adjacent materials and without projecting exterior stops 5) Accommodate acceptable construction tolerances.
6) Not utilize snap-engaged components as structural members. 7) Include butt joint mullions and glazing where indicated on the drawings and per the requirements of Section 08 80 00 - Glass and Glazing.
d. Deviations from the drawings and specifications must be specifically documented on the submittals for review by the Owner, who will be the sole judge as the acceptance or rejection of any or all deviations.
e. Any steel members and connections required to support or connect the system are to be designed, furnished and installed by the General Contractor, unless specifically indicated on the structural drawings as being the responsibility of others. f. System shall be installed correctly so all water intrusion drains to the exterior of the building.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver all parts ready for erection; store in close proximity to final locations.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 13
C. Package and store materials in a manner that will prevent surface damage, contamination, distortion, brakeage or structural weakening. Adhesive papers or sprayed-on coatings which bond when exposed to sunlight or weather are not permissible.

D. Replace any materials damaged during manufacture, shipping, storage or installation.

E. Protect stored and /or in place materials from contamination and damage.

F. Follow glass manufacturer’s instructions for receiving, storing, handling and cleaning glass, as well as treatment of insulated (dual glazed) units which have air space pressure compensation provision for shipping.

1.7 JOB CONDITIONS
A. Field-verify that all components, backing, etc. by others are installed correctly to proceed with installation of products as herein specified.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish manufacturer’s additional five (5) year warranty agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

D. Under the terms of these warranties, the General Contractor agrees to repair or replace defective materials, workmanship or failures, in a timely, satisfactory manner, at no cost to the Owner. Defective materials /workmanship include (but are not necessarily limited to) the following:

1. Any abnormal deterioration, aging or weathering.

2. Water or air leakage exceeding the limits herein specified, including that caused by shifted glass lites.

3. Structural failure resulting from wind loads or forces not exceeding design criteria.

4. Adhesive failure, cohesive failure, cracking or discoloration of sealants.

5. Disengagement of gaskets or weatherstrips under conditions not exceeding specified design criteria.

6. Glass lites which:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 14
a. Experience brakeage due to nickel sulfide inclusions, shifting of glass, or wind pressures and forces not exceeding design criteria.
b. When heat-treated, have a surface compression stress greater than 6000 psi. c. Experience cracking, peeling or discoloration of reflective coating or contain coating flaws in excess of those outlined in PPG Coating Quality Criteria. d. Experience deterioration of insulating glass edge seal due to causes other than brakeage which results in intrusion of dirt or moisture, internal condensation or fogging, deterioration of protected internal glass coating, and any other visual evidence of seal failure or performance.

7. Damage to other materials caused by falling glass which has broken due to defects.

8. Hi-Performance organic coating and anodic coating not in compliance with:
a. Coating thickness requirements
b. Coating weight requirements
c. Performance requirements for stain resistance

9. Malfunctioning of entrance doors.

10. Material, Craftmanship, etc. warranty periods as herein listed: (not for finish) a. Storefront: 5 year
b. Entrances: Limited Lifetime
c. Thermal barrier: 10 year
d. Operable Windows: 2 year
E. Finish Warranties:

1. Kynar 500
a. Film integrity 20 years,( No change)
b. Chalk Resistance 20 years. @ value 6 (ASTM D659)
c. Color change 20 years @ 7NBS max.
d. Salt spray, air pollution & smog without any adverse affect = 5yrs. e. Adhesion to aluminum: 20 years

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Floor Slab

2. Wall Framing and Finish

3. Finish Caulking

4. Support head frame at building storefront glazing, manufacturer & installer per this section shall coordinate their work with others to insure that proper support and framing is provided for window wall system.

5. Structural framing.

6. Intermediate floor slab edges.

B. Related Sections include, but are not limited to the following:

1. Division 1

2. Section 05 50 00 – Miscellaneous Metal Fabrications
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 15

3. Section 07 92 00 – Sealants and Caulking

4. Section 08 71 00 – Door Hardware

5. Section 08 80 00 – Glass and Glazing
C. Related Documents include, but are not limited to the following:

1. Division 1 Supplementary Conditions

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

1.13 GENERAL SYSTEM DESCRIPTION
A. System Design Criteria

1. The system shall be weather-tight, structurally sound, self-draining and will allow no water infiltration (infiltration is defined as the appearance of uncontrolled water other than condensation on the indoor face of any portion of the system).

2. The details shown indicate the preferred profiles and dimensions to achieve the design concept.

Dimension and profile adjustments to those shown may be made, provided that the visual design concept and intent of the specifications are maintained.

3. All components, assemblies and completed work shall conform to the following performance criteria and comply with the applicable codes of governing agencies. Except when applicable codes make other provisions, or as noted herein, loads shall act in combinations that provide the most unfavorable conditions. Wind loading need not be considered as additive to seismic loading. a. System shall be designed for flexural, shear and torsional stresses resulting from positive and negative wind pressures of a magnitude established. Refer to “General Manufacturing Requirements” heading.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer for each product type.

B. Acceptable manufacturers shall be one of the following and as listed herein and in Drawings:

1. Storefront / Window Wall system & Entrances
a. Arcadia, www.arcadiainc.com, Vernon, CA
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 16
b. Oldcastle Glass (Vistawall Products), www.oldcastleglassbe.com ,Terrell, TX c. Kawneer Company, Inc., www.alcoa.com Phone No. (916) 638-5744. Kawneer Company, Inc., www.alcoa.com Phone No. (916) 638-5744.
d. Efco, www.efco.com

2. Sealant (concealed)
a. CR Laurence CO., Inc., www.CRLaurence.com

3. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform. b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of aluminum extrusion thickness, load capabilities, chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related sections whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. General

1. Aluminum:
a. Alloy for aluminum extrusions shall satisfy requirements for 6063-T5. Provide a minimum nominal well thickness as required for structural members; 1/16” for nonstructural.

1. Manufacturer shall provide notarized certification letter that substantiates how much recycled billet is used and submit to Architect during submittal phase. b. Alloy for clear anodized formed aluminum shall be equal to 5005 or 5052 and 3003 for nonexposed material. Provide a minimum nominal thickness which best suits application. c. Provide alloy and temper recommended by the manufacturer for strength, corrosion resistance, and application of required finish; comply with ASTM B221 for extrusion, bars, wires and rods and ASTM B209 for sheet or plate.
d. Aluminum Sheets and Brakeshapes: Minimum 0.032” thickness. Provide alloy and temper as recommended by the producer or finisher for type of use and finish indicated, and with not less than the strength and durability properties specified in ASTM B209 for 5005-H15. e. Standard commercial tolerances as listed in “Aluminum Standards and Data” shall apply to finished, fabricated and assembled materials except where stricter ones are required for proper function of system.
f. Recycled Content: As herein specified.

2. Steel:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 17
a. Hot-rolled shapes and plate shall comply with ASTM A36. b. Cold-formed steel shall conform to one of the material specifications listed in the AISI “Specification for the Design of Cold-Formed Steel Structural Members” and ASTM A611. c. All steel plates and shapes shall be prime painted, hot dipped galvanized or electro-galvanized.

Any damage to protective coatings shall be touched up in the field with an appropriate coating. d. Hot-rolled sheet and strip shall comply with ASTM A570. e. Integral steel reinforcing at mullions

3. Glass:
a. Shall conform with requirements specified in Section 08 80 00 - Glass and Glazing. 1) Glass for doors is specified in sub sections below.

4. Glazing Materials:
a. Shall conform to requirements specified in Section 08 80 00 - Glass and Glazing. b. Provide glazing sealants, gaskets, splines, and other glazing materials which are recommended and guaranteed by the manufacturer to remain permanently elastic, non-shrinking, nonmigrating and weatherproof for the life of the building. Comply with recommendations of sealant, gasket and glass manufacturers for selection of glazing materials which have performance characteristics suitable for the applications indicated and for conditions at the time of installation. Select materials which are compatible with surfaces contacted in the installation, as demonstrated by testing and field experience.
c. Gaskets and weather seals: (weatherseals)
1) It is the responsibility of the Subcontractor to provide gaskets of a hardness and design such that they will be in contact at all times with adjacent elements during dynamic loading, building and thermal movements and provide a watertight seal as required to meet the performance criteria. They shall be sized in length to prevent pull-back at corners. a) Sponge gaskets shall be extruded black neoprene with a hardness of 50+ /-5 durometer shore A and conforming to ASTM C509-70.
i. Design sponge gaskets to provide 20%-30% compression. 2) Dense gaskets shall be extruded black neoprene with a shore A hardness of 75+ / -5 for hollow profiles and 60+ /-5 for solid profiles, and conforming to ASTM C864. a) Dense gaskets of EPDM are also acceptable, provided the material conforms to all requirements, of ASTM C864 except for flame propagation. 3) Mold all corners of all gaskets, where compatible with installation procedure.

5. Sealants:
a. General Sealant requirements:
1) Locate and identify all sealants by product name on shop drawings. 2) Sealants and joint fillers, both for joints within the entrance storefront and window system construction and for joints at the interface of entrance, storefront and window City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 18
system construction and other work, shall comply with requirements specified in Section 07 92 00 – Sealants and Caulking and Section 08 80 00– Glass and Glazing. 3) Structural glazing sealant shall be Silicone Glazing Sealant specifically designed and tested for structural glazing, as specified in Section 07 92 00 – Sealants and Caulking and approved by glazing manufacturer.
4) Perimeter and flashing sealant shall be Silicone Sealant as specified in Section 07 92 00 – Sealants and Caulking.

6. Entry Doors
a. Storefront Doors:
1) Profile as herein specified
2) Constructed of tubular extruded aluminum sections.
3) Structurally joined at corners with heavy concealed reinforcement brackets secured with fasteners and deep penetration welds.
4) Accurately prepared and reinforced for hardware, specified in this section and for hardware specified in Section 08 71 00 - Door Hardware.
5) Glass for aluminum framed entry doors shall be fully tempered. a) Glass color to match window vision glass, except where note on drawings to be clear. 6) Weatherstripped to meet specified performance criteria. 7) Fabricated to facilitate replacement of glass or panels, without disassembly of stiles and rails.

Furnished with snap-on extruded aluminum stops also mechanically attached requiring special tool for removal.
8) Without exposed screws.
9) Adjustable after installation for frame/door clearance. 10) Welded corner construction.

7. Miscellaneous Materials:
a. Fasteners:
1) Type, size, alloy, quantity and spacing of all fasteners and anchorage devices shall be as required for performance.
2) All screws, bolts, nuts, washers and rivets in wetting locations, window and door assembly and hardware fasteners in non-wetting locations can be stainless steel or an approved equal.

Identify wetting and non-wetting areas on drawings.
3) Exposed fasteners will be permitted only where approved by the Owner and shall be stainless steel with countersunk oval head, Phillips drive, finished to match adjacent finish. 4) All anchor bolts and nuts shall have self-locking devices incorporating nylon insets or patches similar to those manufactured by USM Corporation, Nylock Fastener Division. 5) “TEK” screws / fasteners are not allowed for any use or at any location. b. Inserts for anchorage in concrete shall be steel with integral or welded projections for embedment, and be prime painted, hot dip galvanized rolled steel, or hot dip galvanized formed steel complying with ASTM A386.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 19
c. Weep hole baffles shall be 45 pore per inch open cell plastic coated clear urethane foam, compressed 30%-50%.
d. Slip pads:
1) Provide eel slip, nylatron, high impact polystyrene or approved equal slip pads between moving parts at all dynamic connections.
2) Provide minimum thickness of 1/16” for nylatron and polystyrene, and 1/8” for eel slip. 3) Do not use nylatron or polystyrene in close proximity to a field weld. e. Flashings in direct relationship with the aluminum framing system shall be of 24 gauge galvanized steel or aluminum meeting the requirements of Section 07 62 00 - Flashing and Sheet Metal.
1) Exposed flashings shall have hemmed edges where exposed to view to provide stiffness and a retainer for splice sleeves.
2) Flashings shall be finished to match finishes for aluminum framing system in this specification.
f. Brake-shapes glazed into the System shall be of 1/8” plate aluminum. 1) Provide stiffeners as required and pocket reducer / retainers as required to install brakeshape. 2) Brake-shape shall be finished in accordance with the aluminum framing system in this specification.
g. Shims, blocking and spacers:
1) Unless otherwise noted on the drawings, metals used for shims, blocking and spacers shall be zinc chromate painted steel, incorporating separators for dissimilar materials and at dynamic connections.
2) Do not use aluminum or plastic shims at structural connections or horseshoe (U) shaped shims at dynamic or other connections where they may work free. 3) Shims of wood or other organic materials are not acceptable. h. Prime Paint:
1) All steel and unpainted aluminum in contact with steel, masonry or concrete shall be painted with zinc chromate.
2) All unpainted aluminum flashing installed at sills shall be painted with zinc chromate. 3) Prime paint steel part of anchors, reinforcement and supports with zinc chromate. After field welding, remove weld slag and touch up primed surface.
4) Provide minimum dry film thickness of one mil for zinc chromate, and 30 mils for bituminous paint.
a) Zinc chromate primer shall conform to Fed. Spec. TT-P-645. i. Kraft Paper: Kraft paper with reinforcing mesh.

8. Bituminous Waterproof Membrane Flashing: Provide a cold-applied, self-adhering membrane composed of high-strength polyethylene film coated on one side with a layer of adhesive-consistency rubberized asphalt.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 20
a. Refer to Section 07 13 26 – Cold Applied Self-Adhering Membrane (CASAM).

9. Coordinate all requirements, including type of switch, wire leads and location on door with control system and security General Contractor prior to submittals, fabrication and installation.

B. General Manufacturing Requirements

1. Submit ICC certified report of the following:
a. Component parts and accessories shall be double-plated steel, aluminum, polycarbonate, or other corrosion resistant materials.
b. Provide bolts or screws min. as required by manufacturer. 1) Fasteners shall be sized and spaced to resist the tensile & shear loads imposed, with no exposed screws and/or bolts beads; no aluminum fasteners. 2) Exterior aluminum flashing system shall comply with the shape as shown on drawings and may be either extrusion or bent shaped.

2. Metal alloy and coating shall be verified by manufacturer with required submittal of an ANSI/AAMA Report.

3. Provide aluminum window systems and aluminum doors as dimensioned and shown on the Drawings, complete with anchors of the type needed for installation and complying with the following standard as defined in ANSI A134.1.

2.3 MATERIALS - PRODUCTS SCHEDULE
A. STOREFRONT SYSTEM

1. Shall be:
a. System: Series 3000 Thermal Multiplane
1) Type: SF Type 01
2) Mfgr: Oldcastle Glass (Vistawall Products)
3) Glazing:
a) Installation: Outside Glazed
b) Glass joints: Captured
c) Glass Location at Mullion- Options:
i. Center
d) Glass Type:
i. Vision: 1” Insulated
ii. Refer to Section 08 80 00 – Glass and Glazing
4) Profiles: 2" x 4-1/2"
5) Construction:
a) Integral steel reinforcing to accommodate spans & wind loads b) Thermally broken frame
c) Sill: As indicated on drawings
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 21
6) Accessories: (as required & filler extrusions as required for complete installation, including, but not limited to;)
a) Head Receptor: M0-678/M0-224 with seals
B. SEALANT

1. Exposed Conditions:
a. Refer to Section 07 92 00 – Sealants and Caulking

2. Mastic bed below sills:
a. Manufacturer: Tremco
b. Product: Vulkem 116
c. Type: One part polyurethane
d. Color: Black or approved alternate

3. Concealed fasteners:
a. Manufacturer: CR Laurence Co., Inc.
b. Product Type: Silicone

1. Model: No. 33 S

4. Miscellaneous conditions:
a. Manufacturer: CR Laurence Co., Inc. (confirm with window wall mfgr.) b. Product Type: Silicone
c. Model: No. 33 S (confirm with window wall mfgr.)
d. Applications: Pressure Plates, Shear Blocks, locations as directed by Mfgr.

5. Door thresholds:
a. Refer to Sealants, Caulking & Adhesive Tape Specification Section

2.4 ENTRANCES – (Aluminum Storefront Entrance doors)
A. Options:

1. Mfgr: Oldcastle Glass (Vistawall Products)

2. #500 Wide style doors
a. Vertical Stiles:

1. Meeting Stile: 5 3/4” overall D-70 and D-25

2. Jamb Stiles: 5 3/4” overall D-13
b. Top Rails: 8 3/4” overall D-71
c. Bottom Rails: 10 3/4” overall D-61

1. Construction:
a. Provide square glazing receptor & seals for glass.

2. Provide Muntins at glass for true divided lites. Refer to Storefront Window Types as indicated on Drawings.

3. Hardware:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 22
a. Provided under Section 08 71 00 Door Hardware (unless noted otherwise)

1. Doors shall be prepared for all specified hardware and all other necessary associated hardware for a complete assembly.

2. Automatic door bottoms:
a. Preparation of door bottom for Automatic Door Bottom;(Refer to Hardware Specifications)
b. Prepare door for Automatic Door Bottom (supplied under hardware specification) - remove portion of hinge side vertical stile web to accommodate height of automatic door bottom such that mechanism extends to extent of door edge at hinge side. c. Prepare door Vertical stile at strike side same as above if door is not supplied w/ concealed vertical rods, if door is to have Concealed Vertical Rods, then Strike Side vertical stile shall remain its standard integrity.
d. Provide written manufacturers warrantee for doors after factory modifications.

2.5 GLAZING
A. Refer to Section 08 80 00 - Glass and Glazing.

2.6 OTHER MATERIALS
A. Provide aluminum entrance and fixed window wall and storefront system as dimensioned and shown on the Drawings, complete with anchors of the type needed for installation.

1. Provide anchor bolts or screws minimum as required by manufacturer. Fasteners shall be sized and spaced to resist the tensile and shear loads imposed, with no exposed screws and/or bolts beads, no aluminum fasteners.

2. Exterior flashing system shall comply with the shape as shown on drawings and may be either extrusion or bent shaped aluminum.

3. All members shall be extruded aluminum alloy 6063-T5. Component parts and accessories shall be double-plated steel, aluminum, and polycarbonate.

4. Provide flashing components as detailed and as required to provide a weathertight assembly.

B. Integral & concealed steel reinforcing within mullions.

1. Supplied and installed under scope of work of this section.

C. Brake shape transition components to be installed between glass and end of interior walls:

1. Material: Aluminum

2. Finish: Match window mullions

3. Size: Full height between horizontal mullions x finish wall width.

4. Attachment: Two sided neoprene tape
a. Color: Black
b. Size: Full width and length of brake shape where it butts against glass D. Copings, flashings, etc.

1. Material: Aluminum

2. Finish: Match window mullions
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 23

3. Size: Refer to documents.

4. Attachment: Refer to documents

5. Construction:
a. Provided as part of this section.
b. Installed under this section scope of work.
c. Design to be in compliance with this section and Section 07 62 00 – Sheet Metal Flashing and Trim
PART 3 - EXECUTION

3.1 INSPECTION/EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 MOCK-UP
A. Erect at location approved by Architect.

1. Mock-up shall be part of final construction once approved by Architect and Owner Representative.

2. Mock-up shall comprise of all components and finishes as specified and indicated in Drawings.

B. Mock-up

1. Size: One window with mullions

3.5 INSTALLATION
A. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 24
B. Install framing, glazing and adjust the work of this Section in strict accordance with the manufacturer's recommendations as reviewed by the Architect, anchoring all units firmly into position square, plumb, straight and true.

C. Dissimilar materials:

1. Where aluminum surfaces come in contact with metals other than stainless steel, zinc, or white bronze, then isolate the aluminum by one of the following methods:
a. Paint the dissimilar metal with a prime coat of zinc-chromate primer, followed by two coats of aluminum metal-and-masonry paint.
b. Apply a good quality sealant material between the aluminum and the dissimilar metal complies with "Sealants & Caulking" specifications.

D. Sills

1. Install full bed of sealant below sill in conjunction with shims, press down firmly and remove sealant that presses out past sill mullion.

2. Install finish backer rod & sealant at outer edge of sill.

3. Isolate the dissimilar metals with non-absorptive tape or gaskets.

E. Face caps when applied to mullions shall be installed such that no deformations are evident on face of cap face - all locations with imperfections shall be replaced by General Contractor at no additional cost.

F. Test all window installations at jambs & sills for water penetration with hose spray test after installation.

G. Copings, flashings and other brake shapes associated with the windows shall be installed and provided under this section and coordinated with Section 07 62 00 – Sheet Metal Flashing and Trim.

H. Sealant:

1. Exterior:
a. Sealant exposed face shall be set flush with face of mullion, unless noted or detailed otherwise. b. Sealant shall be tooled with smooth concave face in compliance with sealant manufacturer’s recommendations.
c. Install at all locations as indicated on manufacturers details and as directed by manufacturer and their specifications.

2. Interior:
a. Sealant at sill mullions at floor shall be set back ½” from face of mullion to allow floor covering material to fit below mullion.
b. Jamb and head sealant shall be flush with face of mullion, unless noted or detailed otherwise. 1) Sill sealant at floor mounted mullions shall typically be inset ¼” minimum to allow floor finish to pass under mullion.
c. Sealant shall be tooled with smooth concave face in compliance with sealant manufacturer’s recommendations.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 25

3.6 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.7 TESTING
A. Storefront Windows:

1. General:
a. Perform tests witnessed by Owner and Architect.
b. Failing opening assemblies shall be removed and replaced / repaired to meet test requirements at no additional cost to Owner.

2. Type: Spray Rack test

3. Scope: General Contractor shall spray test the openings with water to ensure that the assembly is watertight.
a. General Contractor shall provide required lifts, apparatus and such to perform tests. b. Coordinate with sill can assembly testing.

4. Description:
a. General Contractor shall spray test with water to ensure that the assembly is watertight and protects against water intrusion.
b. Involves a rectangular, calibrated piping system with spray nozzles every 12 inches to cover the building component with a uniform spray pattern.
1) The unit is placed 12 inches away from the building component and is pressurized with pumps to provide adequate pressure according to listed standards.

5. Quantity: 3 locations per building
a. Owner, Architect, and General Contractor shall select locations which represent the combination of storefront types, storefront conditions/details, and surrounding building materials, and weather exposures found in the project.

6. Duration: 15 minutes

7. Failure: Should testing result in leakage, eliminate the causes of such leakage at no additional cost to the Owner.
a. Remedial measures must maintain standards of quality and durability and are subject to approval. 1) Leakage, in this specification, is defined as being any appearance of uncontrolled water other than condensation on the indoor face of any part of the wall.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 26
a. Provide sill can assembly testing as specified herein. b. Provide threshold assembly testing as specified herein.

B. Thresholds:

1. General:
a. Perform threshold assembly testing at no additional cost to the Owner when initial storefront water infiltration testing results in leakage.
b. Perform tests witnessed by Owner and Architect.
c. Failing windows shall be replaced and repaired to meet test requirements at no additional cost to Owner.

2. Type: Spray Rack test

3. Scope: General Contractor shall spray test the openings with water to ensure that the assembly is watertight.
a. General Contractor shall provide required lifts, apparatus and such to perform tests. b. Coordinate with sill can assembly testing.

4. Description: General Contractor shall spray test with water to ensure that the assembly is watertight and protects against water intrusion.
a. Involves a rectangular, calibrated piping system with spray nozzles every 12 inches to cover the building component with a uniform spray pattern.
1) The unit is placed 12 inches away from the building component and is performed at a specified air pressure differential while simultaneously spraying water onto the exterior face of the assembly at 5gph/ft2 according to listed standards.

5. Quantity: Test one single door opening and one double door opening.

6. Duration: 15 minutes

7. Failure: Should testing result in leakage, eliminate the causes of such leakage at no additional cost to the Owner.
a. Remedial measures must maintain standards of quality and durability and are subject to approval. 1) Leakage, in this specification, is defined as being any appearance of uncontrolled water other than condensation on the indoor face of any part of the wall.

C. Sealant:

1. General:
a. Perform tests witnessed by Sealant mfgr’s representative. b. Failing sealant assemblies shall be removed and replaced.

2. Type: Pick and adhesion test

3. Scope: General Contractor shall periodically test sealants in place for adhesion, using methods recommended by sealant manufacturer.
a. General Contractor shall provide required lifts, apparatus and such to perform tests.

4. Description:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 27
a. Comply with sealant mfgr’s recommendations.

5. Quantity: Test one 36” long section at one location for each exterior building elevation and floor level, min.

6. Failure: Should testing result in adhesion failure, remove, clean, prime and reinstall sealant at no additional cost to the Owner.
a. Remedial measures must maintain standards of quality and durability and are subject to approval.

3.8 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this section prior to and during installation, and protect the installed work and materials of other trades.

D. Labels:

1. Leave all labels in place, intact and legible, until reviewed and approved by the Architect.

2. Do not at any time remove required AAMA labels.

E. Prior to completion of the work, thoroughly clean all exposed surfaces and glazing.

1. Use only the cleaning materials and techniques recommended by the manufacturer of the material being cleaned.

2. Do not scratch or otherwise damage the glass, screen, or aluminum finish.

F. Institute protective measures and other precautions required to assure that aluminum entrances and storefronts will be without damage or deterioration, other than normal weathering, at time of acceptance.

G. All damaged fabrications, including but not limited to damaged mullions, muntins and face caps caused by fastener read through shall be replaced at no cost to Owner.

H. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

I. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

J. Provide record drawings in accordance with Division 1 closeout submittal procedures t.

K. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 08 41 13
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications

ENTRANCES, WINDOW WALLS,
STOREFRONTS AND CURTAIN WALLS 08 41 00 - 28

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 1
SECTION 08 51 13 – ALUMINUM WINDOWS
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified and as necessary to complete the work including but not limited to:

1. Aluminum full lite nail flange windows:
a. Custom sizes
b. Standard or specified anchorages, trim and attachments to substrates. c. Including the following types:
1) Single Hung Window Units

2. Provide insulated glazing units

3. Provide accessories, weather stripping, latching & locking mechanisms, etc.

4. Provide dual concealed flashing at all window and door openings.

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

C. Title 24, Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
D. American Society for Testing and Materials (ASTM):

1. ASTM E283 - Standard Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls and Doors

2. ASTM E330 - Standard Test Method for Structural Performance of Exterior Windows, Curtain Walls and Doors by Uniform Static Air Pressure Difference

3. ASTM E547 - Standard Test Method for Water Penetration of Exterior Windows, Curtain Walls, and Doors by Cyclic Static Air Pressure Differential

4. ASTM E774 - Specification for Sealed Insulating Glass Units

5. ASTM C 1036 - Standard Specification for Flat Glass
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 2
E. Test samples shall comply with requirements in AAMA 101V -86 for test samples size and methods.

F. ANSI/AAMA 101-88 F-R25

1. Wind loading = 95 m.p.h. Basic Wind Speed

2. Exposure = C
G. National Glass Association (NGA), www.glass.org

1.3 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements.

D. Submit Manufacturers data and shop drawings.

E. Shop Drawings: Submit shop drawings with specified finish for each type of window specified and detailing for building substrate.

F. Samples:

1. Submit corner section with specified finish.

2. Include 12” x 12” samples of all glazing types along with literature of quality of construction, and specified finish.

G. Product Data:

1. Submit manufacturer’s product specifications, technical support data, installation and maintenance recommendations and standard details for each type of window unit required.

Include finishing methods, hardware and accessories.

2. Window flashing components and design.

H. Quality Control Submittals:

1. Certificates: Submit manufacturer's certifications indicating compliance with specified performance and design requirements, certification shall be by recognized, independent testing laboratory certifying that each required type of window complies with performance requirements indicated.

1.4 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Air Infiltration: Not more than 0.15 cfm per square foot of overall frame area at an inward test pressure of 1.57 psf.

C. Water Penetration: No water penetration as defined in the test method at an inward test pressure of 3.0 psf.

D. Structural Performance: No glass breakage, damage to hardware, permanent deformation that City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 3
would impair operation of the unit, or residual deflection at a positive (inward) and negative (outward) test pressure of 37.5 psf.

E. Material:

1. Frame & Sash – extruded aluminum alloy 6063-T5

2. Components & Accessories – stainless steel

1.5 DELIVERY, STORAGE, AND PRODUCT HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver in original packaging, store off the ground, and protect from weather.

C. Store units in an upright position in a clean and dry storage area.

D. Prime or seal wood surfaces, including surfaces to be concealed by wall construction, if more than 30 days will expire between delivery and installation.

1.6 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures. Submit a written warranty, executed by the window manufacturer, agreeing to repair or replace units that fail in materials or workmanship for a period of 3 years after substantial completion. Materials and labor are to be covered in full by the manufacturer. Insulated glass units are 10-year pro-rated warranty.OPERATION AND

MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding operation of the equipment.

2. Complete instructions regarding maintenance of the equipment, materials, finishes, etc.

3. Refer to Division 1 for closeout submittal procedures.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Manufacturer shall be subject for compliance with all requirements, provide products from the following list:

1. Windows:
a. Milgard Windows

2. Window Flashing:
a. Fortifiber www.fortifiber.com
b. WR Grace www.grace.com

3. Reviewed Equivalent by Architect.
a. Substitutions shall require Architect's approval and shall be given in letterform.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 4
b. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. All specified materials indicated are as manufactured by: Milgard and shall be installed according to current listed specification requirements.

C. Refer to drawings, details, and other related specification section whether listed or not. Details shall set requirements for size and configuration of systems.

2.2 MATERIALS
A. General: Comply with requirements of ANSI/AAMA 101 - 88 B. Aluminum Structural Components:

1. Extruded aluminum alloy shall be 6063-T5 for strength, corrosion resistance and application of required finish.

2. Extrusion members are to be 0.060” in thickness for structural walls.

C. Fasteners:

1. Provide aluminum, non-magnetic steel, epoxy adhesive, or other materials warranted by the manufacturer to be non-corrosive and compatible with window members, trim, hardware, anchors and other components of the window units.

2. Where fasteners screw-anchor into aluminum frame members less than 0.125” thick, reinforce the interior with aluminum to receive screw threads, or provide standard, non-corrosive, pressed-in, splined grommet nuts.

D. Anchors, Clips and Window Accessories:

1. Fabricate anchors, clips and window accessories of aluminum or non-magnetic stainless steel.

2. Anchor clips and window accessories fabricated of hot-dip zinc coated steel or iron may be used for concealed work.

E. Hardware:

1. Provide the mfgr’s standard hardware fabricated from a corrosive-resistant material and of sufficient strength to perform its intended function.

2. For application of exposed hardware, use fasteners that match the finish of the hardware being fastened.

3. Rollers shall have stainless steel wheels with ball bearings encased within a polycarbonate housing.

4. Lock shall be injection-molded polycarbonate with a spring-activated latch mounted in the meeting stile.

5. Secondary lock shall be a two position concealed friction secured deadbolt mounted in the vent lock stile. The primary position locks the window vent fully closed. The secondary position locks the window vent open 2 inches for ventilation.

F. Weather-stripping:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 5

1. Provide the mfgr’s compressible weatherstripping at each edge of each operating sash.

2. Weatherstripping shall be concealed when sash is closed.

G. Glazing Stops:

1. Provide glazing stops (beads) coordinated with glass section indicated. (beveled snap on stop not acceptable)

2. Finish glazing stops to be same finish and color as exterior window frame finish.

H. Insect Screens:

1. Provide removable insect screen panel for each operable sash, with 18” x 16” replaceable mesh and vinyl retainer spline.

I. Glass & Glazing:

1. Provide the mfgr’s standard:
a. Sealed insulated dual pane unit: (provide design to accommodate wind loading) 1) Thickness: 3/4” overall
a) 3/16” low - E exterior
b) 3/16” clear interior
2) Standards:
a) Complies with ASTM E774 Level A and is at least 3/4” in overall thickness.

2. Glass types / Glazing specifications:
a. Select from mfgr’s standard options:

Type: Gas Fill U-Value SHGC VLT

1. SunCoat /clear air 0.41 0.32 0.58

2. SunCoat /clear Argon 0.37 0.31 0.58

3. SunCoat Max/clear air 0.40 0.24 0.54

4. SunCoat Max/clear air 0. Argon 0.36 0.23 0.54
b. Safety glass at locations indicated and in compliance with applicable local codes & CBC.

J. Mullion types: (submit with shop drawings for Architects review and approval)

1. Full lite design:
a. Single hung – Series 1520
1) Frame: 2-5/8”
K. Finishes:

1. Select from one of the following standard mfgr’s finishes:
a. Clear Anodized
1) 0.4 mills thick, typ. & min.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 6
L. Window flashing

1. Three Component assembly:
a. Schedule:
1) 1st:
a) Mechanically attached first layer at jambs and sill of window opening; i. Mfgr: Fortifiber
ii. Product: Moistop Flashing
iii. Width: 9”
iv. Fasteners: As approved by product manufacturer.
2) 2nd:
a) Sealant
i. Mfgr: Fortifiber
ii. Product: Moistop Sealant
iii. Width: 12”
iv. Fasteners: As approved by product manufacturer.
3) 3rd:
a) Self adhering waterproof membrane flashing installed over nail flange at jambs and head in shiplap fashion.
i. Mfgr: Fortifiber
ii. Product: E-Z Seal Flashing
iii. Width: 12”
iv. Fasteners: As approved by product manufacturer.
4) 4th:
a) Wall membrane installed over entire wall and butted to window. i. Refer to wall material specification.

2.3 CONSTRUCTION
A. All window frames shall be a minimum of 2 1/8” deep, with corners mortised and securely joined with double plated steel screws engaging integral extruded screw races. All frame joints shall be sealed.

B. Window vents and fixed panels shall be assembled around the glass utilizing full channel vinyl gaskets. The frame corners are to be rigidly held with double plated steel screws engaging integral extruded screw races in the horizontal members. Vent weather-stripping shall be a single plane, and shall be polypropylene pile.

C. Locking device of window shall be able to withstand a force of 300 pounds in any direction.

2.4 ACCESSORIES AND TRIM
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 7
A. Installation Accessories:

1. Nailing Fin: Typical at jambs, sill and head.

B. Weep System:

1. Provide rectangular weep holes located in the frame sill for effective drainage and moisture control.

C. Screen:

1. Provide bug screens at all operable vent locations, typ.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions: Before installation, verify that openings are plumb and square and of proper dimension. Report frame defects or unsuitable conditions to the General Contractor before proceeding.

B. Acceptance: Beginning of installation means acceptance of existing conditions.

3.2 FABRICATION
A. General: Fabricate window units to comply with indicated standards.

B. Preglaze: Fabricate units at the factory for applications indicated.

3.3 INSTALLATION
A. Comply with manufacturer's specifications and recommendations for installation of window units, hardware, operators, accessories and other window components.

B. Comply with reviewed shop drawings.

C. Install sealant and related backing materials at perimeter of assembly in accordance with Section 07 92 00 – Sealants and Caulking. Do not use expansive foam sealant.

D. Windows shall be factory sized to fit in framed opening.

E. Windows shall be fabricated to rough opening size with ½” deductions automatically made, so that no calculations will be required.

F. Opening panels must be closed and locked during installation. Windows must be installed level, plumb and square with ¼” clearance on all sides with weep holes at bottom.

G. All windows shall be installed by skilled workmen, trained for this type of work.

H. All openings shall be fully prepared to receive windows. Any shoring or debris must be removed and any corrective work completely finished prior to the start of window installation.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 8
I. Windows shall be installed level, square and plumb without bind. The vents shall be aligned and adjusted for optimum weathering contact to the frame and ease of operation. After installation the primary and secondary locks shall be checked and adjusted for proper function.

J. Nail fin windows shall be securely attached t the framing with #6d or larger galvanized nails or other corrosion resistant fasteners.

K. Headers:

1. Must not be nailed.

L. Fastening:

1. Nail through fin into framing along sides and base.

2. At the head, nails may be placed ½” above fin and bent down over fin to allow for header deflection, but shall not interfere with siding, sheathing, trim, etc.

3. Install fastener screws such that operable panel cannot be lifted from window assembly.

M. Adjust operating sash and hardware to provide tight fit at contact points and weatherstripping.

N. Lubricate hardware and moving parts.

O. Install flashing and building paper and building wrap at window opening in shiplap fashion.

P. Install window opening multiple flashing assembly in accordance with manufacturer’s recommendations with components as herein specified.

3.4 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Cover windows during spray painting or other construction operations that might cause damage.

C. Protection of all installed window shall be the responsibility of the General Contractor.

D. Labels:

1. Leave all labels in place, intact and legible, until reviewed and approved by the Architect.

2. Do not at any time remove required AAMA labels.

E. Promptly after, thoroughly clean all exposed surfaces and glazing interior and exterior.

1. Use only the cleaning materials and techniques recommended by the manufacturer of the material being cleaned.

2. Do not scratch or otherwise damage the glass, screen, or aluminum finish.

F. Institute protective measures and other precautions required to assure that aluminum entrances and storefronts will be without damage or deterioration, other than normal weathering, at time of acceptance.

G. Repair all minor damage to finishes as approved by Architect, replace all other.

H. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 9
I. Provide record drawings in accordance with Division 1 closeout submittal procedures.

END OF SECTION 08 51 13
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ALUMINUM WINDOWS 08 51 13 - 10

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 1
SECTION 08 62 00 – UNIT SKYLIGHTS
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with roof construction and related trades.

C. Verify applicable dimensions at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified and as necessary to complete the work including, but not limited to:

1. Aluminum metal framed skylight design, engineering and fabrication of the extruded aluminum framing, integral closures, trim and perimeter flashing as shown on the contract drawings and as herein specified.

2. Fasteners, anchors and related reinforcement.

3. Glass and glazing materials including gaskets, sealants, spacers, blocking and related materials.

4. Installation of entire Skylight System.

E. Coordinate work and materials with Division 16 and Electrical Drawings for required power, switching and wiring connection to lighting controls.

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Architectural Manufacturers Association (AAMA), www.aamanet.org

1. AAMA/WDMA/CSA 101I.S.2/A440-05 – Series/Model 800MD Double Hip Sunoptics skylight E. Aluminum Association (AA), www.aluminum.orgUnderwriters Laboratory (UL) F. American Society For Testing and Materials (ASTM), www.astm.org

1. ASTM D 1003 – Transmission Haze Measurements (Procedure A) G. Architectural Testing, INC, (ATI), www.archtest.com

1. ATI - Code Compliance Research Report CCRR-0113, 07.24.07, 717.764.7700 H. International Code Council (ICC)
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 2
I. National Fenestration Rating Council, NFRC, www.nfrc.com

1. Report: Sim. Report #: A2457.01-301-45
J. Occupational Safety and Health Administration (OSHA), United States Department of Labor, www.osha.gov

1. OSHA – Regulations Standards – 29 (CFR) as approved by State of California

2. OSHA – Regulations Standards – 29 (CFR), Section 1926 Occupational Safety and Health Standards for Construction as approved by State of California

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

B. Standards:

Item Name of Test Performance Testing Std.

Acrylic lens plastic ATI – CCRR-0113
Skylight assembly –
Structural
Performance,
Durability & Burning
Construction Pass
ATI – Report No: 89255.01-
301-18, test date 02.03.09 &

ATI, AAMA/WDMA/CSA
101/I.S.2/A440-05, Test date

12.22.09 Shading coefficient Pass Tait Solar Co., Inc test No. 93074-A
Transmission Haze Comply ASTM D1003 and tested per
ASTM E167
A. Glazing:

Heat Transfer Coefficient –
3/16” Clear prismatic lens
Pass Tait Solar Co., Inc test No.
93074-A
Withstand 200lb. weight
dropped from 2’-0” above
glazing
Glazing integrity Pass Mfgr.

Withstand 500lb. concentrated
load placed on glazing
Pass Mfgr.

Refer to drawings and as herein specified

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 3
B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
D. Submit Manufacturer’s data and shop drawings.

1. Schedule of all skylights including, but not limited to:
a. Designation to match drawings
b. Glazing types and layers
c. Sizes

2. Installation instructions for skylights
E. Submit samples.

1. N/A
F. Certification:

1. Testing agency report(s)

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing / installing / finishing similar size projects and complexity.

C. Manufacturer shall have been in business for ten (10) years providing / installing / finishing similar size projects and complexity.

D. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid E. Stipulations:

1. One lens as part of glazing assembly shall be diffuse type F. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work. Agenda for meeting shall include, but not be limited to:

1. Curbs and roofing

2. Framed openings at roof

3. General Contractor shall request meeting 5 days in advance of construction.

G. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures and operation at project closeout.

1. Provide complete calibration of all motorized operations, photo cells and interconnect wiring with controls, line and low voltage control and monitoring system.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 4
H. Miscellaneous criteria:

1. Separate dissimilar metals from each other by painting each metal surface at area of contact with a bituminous coating.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver all components ready for erection; store above grade, blocked and under cover to prevent warping.

C. Keep protective covering on skylight until installation is complete and in accordance with manufacturer’s recommendations.

1.7 JOB CONDITIONS
A. Field verify that all roof openings, roofing, components, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish manufacturer’s additional ten (10) year warranty agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to the following:

1. Roof construction

2. Roof curbs

3. Finish work inside skylight well
B. Related Sections include, but are not limited to the following:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 5

1. Division 1
C. Related Documents include, but are not limited to the following:

1. Division 1 Supplementary Conditions

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding operation of the equipment.

2. Complete instructions regarding maintenance of the equipment, materials, finishes, etc.

3. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer.

B. Acceptable manufacturer shall be one of the following and as herein listed and in Drawings:

1. SUNOPTICS, www.sunoptics.com (800) 289 – 4700, An Acuity Brands Company, www.acuitybrands.com

2. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 6
A. General: All skylights shall be factory fabricated extruded aluminum framed units, in locations as shown and as detailed on the Contract documents. All skylights shall be designed to carry all tributary roof loads as specified in Building Code (20 psf min.) B. Sizes: As indicated on the Contract documents and herein specified.

C. Assembly Construction:

1. Skylights shall be factory assembled with glazing ready for installation.

2. Skylight frame shall have integral condensate and weepage gutter which drain interior moisture to outside.

3. Corners shall be mitred and welded.

4. Skylight frames shall be insulated and thermally broken.

5. The acrylic glazing shall be separated from the skylight frame with an EPDM rubber aire seal gasket.

D. Materials:

1. Skylight frame:
a. Framework: Extruded aluminum, 6063T5
b. Aluminum finish: Mill finish - AA-C22-A41
c. Gaskets: Extruded neoprene strips as recommended by skylight manufacturer.
d. Fasteners: As recommended by skylight manufacturer.

2. Skylight Glazing:
a. Skylights – typical, u.n.o.
1) Double Hip and/or Pyramid skylights shall be triple-glazed a) Schedule: Prismatic Acrylic Lenses
i. Outer: SR 60 Clear Acrylic
ii. Middle: SR 25 UVA White Acrylic
iii. Inner: SR 20 Clear Acrylic
b) Properties
i. Visible light transmittance: 0.63
ii. SHGC: 0.42
iii. Winter U-value shall be: 0.62
iv. Light Diffusion: 100%

3. Sealants: In accordance with Section 07920.

2.3 MATERIALS – SKYLIGHTS SCHEDULE
A. Fixed skylights

1. Model No. 800 MB
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 7
a. Profile:
1) Pyramid profile: square size
b. Curb: Fixed curb mounted type
c. Glazing:
1) Refer to Materials heading
2) Structurally Domed by: "Sunoptics"
3) Triple glazed
d. Frame: Insulated Thermal Break
e. Accessories:
1) Safety / Security grill

2. Sizes: (as herein scheduled and indicated on Drawings) a. Nominal: Outside curb: Inside Curb: Designation:
1) 4’-0” x 4’-0” 49-1/2” x 49-1/2” 46-1/2” x 46-1/2” 4040

2.4 OTHER MATERIALS
A. Provide all miscellaneous fasteners, brackets, supports, connectors and accessory items as indicated on the Contract documents and as required by the product manufacturer for a complete & proper installation of the materials, products, systems specified herein.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 8

3.4 INSTALLATION
A. General:

1. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

B. Inspect curb framing & roof flashing to assure that installation can proceed in accordance with reviewed shop drawings & Contract documents.

C. Installation to be by the skylight manufacturer or approved authorized representative of the skylight mfg. in strict accordance with reviewed shop drawings & Contract documents.

D. Install perimeter frames on pre-installed walls/curbs using 6" x 3/16" foam rubber gaskets.

1. Cut foam rubber gasket to match width of curb/wall

2. Securely fasten frames to curb by approved mechanical fasteners.

E. Install glazing, gaskets and retaining rings for a complete watertight assembly.

F. After other trades have completed work on adjacent materials, carefully inspect skylight installation and make adjustments necessary to ensure proper installation and weather-tight conditions.

G. Clean all exposed surfaces and materials of adhesives, smear, and stain at completion of installation.

3.5 ADJUSTING
A. Adjust all louvers and other moving parts to operate smoothly, quietly & without binding or jamming.

3.6 COMMISSIONING
A. Provide factory-certified field service engineer to a site visit to ensure proper system installation and operation under following parameters:

1. Skylight louver and photocell operation and integration with building controls.

3.7 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.8 DEMONSTRATING
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 9
A. Provide factory-certified field service engineer to a site visit to instruct user in proper system operation.

3.9 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 08 62 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 10

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
UNIT SKYLIGHTS 08 62 00 - 11
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 1
SECTION 08 62 23 – TUBULAR DATLIGHT DEVICES
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein, and as necessary to complete the work required by project conditions including, but not limited to:

1. Tubular daylight devices and accessories.

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Society For Testing and Materials (ASTM), www.astm.org

1. ASTM A463/A463M Standard Specification for Steel Sheet, Aluminum Coated, by the Hot Dip Process.

2. ASTM A653/A653M Standard Specification for Steel Sheet, Zinc Coated (Galvanized), by the Hot Dip Process.

3. ASTM A792/A792M Standard Specification for Steel Sheet, Zinc Coated (Galvanized), by the Hot Dip Process

4. ASTM B209 Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate.

5. ASTM D635 Test Method for Rate of Burning and/or Extent of Time of Burning of Self-Supporting Plastics in a Horizontal Position.

6. ASTM D1929 Test Method for Ignition Properties of Plastics.

7. ASTM D2843 Standard Test Method for Density of Smoke from the Burning or Decomposition of Plastics.

8. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

9. ASTM E108 Standard Test Methods for Fire Tests of Roof Coverings.

Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 2

10. ASTM E283 Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

11. ASTM E308 Standard Practice for Computing the Colors of Objects by Using the CIE System.

12. ASTM E330 Structural Performance of Exterior Windows, Curtain Walls and Doors.

13. ASTM E547 Test Method for Water Penetration of Exterior Windows, Skylights, Doors and Curtain walls by Cyclic Air Pressure Difference.

14. ASTM E1886 Standard Test Method for Performance of Exterior Windows, Curtain Walls, Doors, and Impact Protective Systems Impacted by Missile(s) and Exposed to Cyclic Pressure Differentials.

15. ASTM E1996 Standard Specification for Performance of Exterior Windows, Curtain Walls, Doors, and Impact Protective Systems Impacted by Windborne Debris in Hurricane.

16. ASTM F1642 Standard Test Method for Glazing and Glazing Systems Subject to Airblast Loading.

17. ASTM F2912 Standard Specification for Glazing and Glazing Systems Subject to Airblast Loading.

18. American Architectural Manufacturers Association (AAMA), www.aamanet.org a. AAMA/WDMA/CSA 101/I.S.2/A440 - Standard/Specification for Windows, Doors, and Unit Skylights

19. FM Standard 4431 - The Approval Standard for Skylights

20. FEMA P-361 - Safe Rooms for Tornadoes and Hurricanes

21. International Code Council (ICC)
a. ICC 500 - Standard for the Design and Construction of Storm Shelters

22. UL 2108 - Low Voltage Lighting Systems

23. GSA-TS01-2003: Standard Test Method for Glazing and Window Systems Subject to Dynamic Overpressure Loadings

24. Unified Facilities Criteria (UFC) 4-010-01, Change October 2013, DoD Minimum Antiterrorism Standards for Buildings

25. CSA C22.2 No. 250.0 – Luminaires

26. ICC-ES AC-16 - Acceptance Criteria for Plastic Skylights

27. IBC Section 1710 - Load Test Procedure for Wind Load Testing on Rooftop Daylight Collecting System - Structural Performance Testing - Devised by ATI PE)

28. IBC Section 2606.7.2 - Installation - Diffuser Fall Out Test (Devised by PE

29. Occupational Safety and Health Administration (OSHA), United States Department of Labor, www.osha.gov
a. OSHA 29 CFR - 1910.23 (e)(8) (Guarding Requirements for Skylights); 1926 Subpart M (Fall Protection); 1926.501(b)(4)(i); 1926.501(i)(2); 1926.501(b)(4)(ii)

30. California State OSHA Fall Protection Code of Regulations, Title 8, Section 3212 (e)(1) Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 3

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

1. Daylight Reflective Tubes:
a. Spectralight Infinity with INFRAREDuction Technology combines ultra-high Visible Light reflectance with Ultra-low Infrared (IR) reflectance.
b. Patented spectrally-selective optical surface yields an average total- and specularreflectance greater than 99.5 percent for the Visible Light spectrum (400 nm to 700 nm) providing maximized visible light transmission and less than 25 percent reflectance for Infrared (IR) heat wavelengths (750 nm to 2500 nm) for minimized heat transmission, resulting in a spectrally-selective Total Solar Spectrum (250 nm to 2500 nm) reflectance less than 37 percent, as measured using a Perkin Elmer Lambda 1050 spectrophotometer with a Universal Reflectance Accessory.
c. Color: a* and b* (defined by CIE L*a*b* color model) shall not exceed plus 2 or be less than minus 2 as determined in accordance to ASTM E 308.

2. Performance Requirements:

Item Name of Test Performance Testing Std.
- Class CW-PG70, 21” dia.:

Type TTDDCC
Type TDDOC

AAMA/WDMA/CSA
101/IS2/A440
Air Infiltration Test: Air infiltration will not exceed

0.30 cfm/sf aperture with a
pressure delta of 1.57 psf
across the tube when tested
in accordance with ASTM E
283.

ASTM E 283
SolaMaster
750 DS-C
(Closed
Ceiling)
and
SolaMaster
750 DS-O
(Open
Ceiling) Water Resistance Test: Passes water resistance; no uncontrolled water leakage
with a pressure differential of

10.7 psf (512 Pa) or 15
percent of the design load
(whichever is greater) and a
water spray rate of 5
gallons/hour/sf for 24
minutes.

ASTM E 547
ASTM E331
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 4
All units tested with a safety
factor of (3) for positive
pressure and (2) for negative
pressure, acting normal to
plane of roof.

Uniform Load Test
No breakage, permanent
damage to fasteners,
hardware parts, or damage to
make daylighting system
inoperable or cause excessive
permanent deflection of any
section when tested at a
Positive Load of 150 psf (7.18
kPa) or Negative Load of 70
psf (3.35 kPa).

ASTM E 330
Passes fall protection test: No
penetration of dome or curb
cap when subject to 400 lb
(160 Kg)/42 inch (1066 mm)
impact drop test
OSHA 29 CFR 1926.506(c)
Safety Net Systems
Fall Protection
Performance
Passes fall protection test California State OSHA Fall
Protection Code of
Regulations, Title 8, Section
3212 (e)(1) Skylight Screens
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements.

D. Submit:

1. Manufacturer Product & Technical Data

2. Manufacturer Installation Instructions

3. Shop Drawings:
a. Schedule of all skylights with designations to match the Drawings b. Solatube layout: Reflected Ceiling Plan, Roof Plan, and Sections including rough opening and framing dimensions
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 5
c. Details showing product components, anchorage, flashing, and accessories.

E. Certifications:

1. Manufacturer Approved/Trained/Certified Installer/Applicator F. Test Reports:

1. Independent testing agency or evaluation service reports verifying compliance with specified performance requirements.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor /Installer/Fabricator shall have been in business for fifteen (15) years providing/installing/finishing similar size projects and complexity.

C. Manufacturer shall have been in business for twenty (20) years manufacturing tubular daylighting devices.

D. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid.

E. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

1. Agenda for meeting shall include, but not be limited to:
a. Roof Framing
b. Roof Curbs
c. Roofing
d. Ceiling

2. General Contractor shall request meeting 5 days in advance of construction.

F. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures and operation at project closeout.

1. Provide complete calibration of all motorized operations including but not limited to photo cells, wiring, line and/or low voltage control and monitoring system.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver products in manufacturer's original containers, dry, undamaged, seals and labels intact.

C. Store products in manufacturer's unopened packaging until ready for installation.

1.7 JOB CONDITIONS
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 6
A. Field verify that all roof openings, roofing, components, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

B. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish manufacturer’s additional ten (10) year warranty agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to the following:

1. Roof construction / framing / substrate

2. Roof curbs

3. Suspended acoustical ceilings
B. Related Sections include, but are not limited to the following:

1. Division 1

2. Section 05 12 00 – Structural Steel Framing

3. Section 06 10 00 – Rough Carpentry

4. Section 07 41 13 – Metal Roof Panels

5. Section 07 54 00tpo – Thermoplastic Polyolefin (TPO) Membrane Roofing

6. Section 07 62 00 – Sheet Metal Flashing and Trim

7. Section 07 9 2 00 – Sealants and Caulking

8. Section 09 51 00 – Acoustical Ceiling Suspension System and Tile

1.11 OPERATION AND MAINTENANCE DATA
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 7
A. Refer to Division 1 for closeout submittal procedures.

B. Submit as part of project closeout:

1. Complete instructions regarding operation of the equipment.

2. Complete instructions regarding maintenance of the equipment, materials, finishes, etc.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer.

B. Acceptable manufacturer shall be one of the following and as herein listed and in Drawings:

1. Solatube, www.solatube.com

2. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. General: Transparent roof-mounted skylight dome and self-flashing curb, reflective tube, and ceiling level diffuser assembly, transferring sunlight to interior spaces; complying with ICC AC-16.

B. Tubular Daylight Device Assembly:

1. Manufacturer: Solatube

2. Series: SolaMaster

3. Model:
a. 750 DS-O Open Ceiling
1) AAMA Type TDDOC
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 8
2) 21” diameter

4. Capture Zone:
a. Roof Dome Assembly: Transparent, UV and impact resistant dome with flashing base supporting dome and top of tube.
1) Outer Dome Glazing
a) Type DA, 0.125 inch (3.2 mm) minimum thickness injection molded acrylic classified as CC2 material; UV inhibiting (100 percent UV C, 100 percent UV B and 98.5 percent UV A), impact modified acrylic blend.
i. Raybender 3000: Variable prism optic molded into outer dome to capture low angle sunlight and limit high angle sunlight.
2) Tube Ring: 0.090 inch (2.3 mm) nominal thickness injection molded high impact PVC.

Prevents thermal bridging between base flashing and tubing and channel condensed moisture. Attached to base of dome ring with butyl glazing rope 0.24 inch (6 mm) diameter; to minimize air infiltration.
3) Dome Seal: Adhesive backed weatherstrip, 0.63 inch (16 mm) tall by 0.28 inch (7 mm) wide.

5. Dome Options:
a. Dome Edge Protection Band for Curb Cap: Type PBC, for fire rated Class A, B or C roof applications with 750 DS Domes on Curb Cap Flashing installations. Galvanized steel.

Nominal thickness of 0.039 inch (1 mm). For use with Curb Cap Flashing (Type FC), only.

6. Flashings:
a. Roof Flashing Base:
1) Two Piece: Two-piece, inverted flange Metal Roof Flashing for Standing Seam Rib roof profile with greater than 14-3/8 inch (365 mm) minimum distance between ribs permitting a required greater than 2 inch (51 mm) clearance between flashing and rib:

Type FSM. Aluminum 1060 Alloy, corrosion resistant conforming to ASTM B 209, 0.059 inch (1.5 mm) thick.
b. Flashing Options: [Specifier: following flashing components are optional. Select those required and delete those not required. Flashing insulator is intended to seal the roof opening and prevent condensation forming on the flashing interior from exposure to humid air in unventilated spaces. Note Curb Cap Insulation (CCI) is required for applications requiring FEMA P-361 and ICC 500 Compliance.] 1) Flashing Insulator: Type FI, Thermal isolation material for use under flashing. 2) Curb Insulator: Curb Insulator, Type CI, Thermal isolation. [Specifier: For use with Flashing Type FC.]
3) Curb Cap Insulation: Type CCI, Nominal 1-inch thick thermal insulation pad to reduce thermal conduction between curb-cap and tubing and thermal convection between Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 9
room air and curb-cap. Rated R-6 (OFxft2xhr/Btu) Insulation is Polyisocyanurate foam utilizing CFC, HCFC, and HFC free blowing agent. Type-1 Class-1 per ASTM C 1289; Passes UL 1715 (15-minute thermal barrier per IBC 2603.4); Attic ventilation may be required per IBC 1203.2(OFxft2xhr/Btu). [Specifier: For use with Flashing Type FC.] 4) Roof Flashing Turret Extensions: Provide manufacturer's standard extension tubes for applications as required: [Specifier: The following turret extension components are optional. Select those required and delete those not required. If more than one size is required indicate locations on the Drawings. Roof Flashing Turret Extension are used to raise the height of the dome above roof level. This extends the height of the turret found on the curb cap or self-flashing. Must order additional tubing to include the added height of turret.] a) Type T12: Additional lengths of 12 inches (305 mm) extension b) Type T24: Additional lengths of 24 inches (610 mm) extension c) Type T36: Additional lengths of 36 inches (914 mm) extension d) Type T48: Additional lengths of 48 inches (1219 mm) extension 5) Membrane Counter Flashing: Type MCF, one piece, seamless, spun Aluminum Alloy 1100, functioning as a counter flashing for use with F8 or F11 Flashings, only, when applied to membrane roofs. Corrosion resistant conforming to ASTM B 209, 0.059 inch (1.5 mm) thick. [Specifier: Select for use with Self Mounted flashing Types F8 or F11; delete if not applicable.]

7. Transfer Zone:
a. Extension Tubes: Aluminum sheet, thickness 0.018 inch (0.5 mm) conforming to ASTM B 209.
1) Reflective Tubes.
a) Reflective extension tube, Type EXX and Type EL with total length of run as indicated on the Drawings.
b) Interior Finish: Spectralight Infinity with INFRAREDuction Technology combining ultra-high Visible Light reflectance with Ultra-low Infrared (IR) reflectance. 2) Tube Options: [Specifier: Select the following optional Extension Tube and Angle Adapters as required. Delete options not required. Note that at least one 24 inch extension tube is required for diffuser.]
a) Extension Tube Angle Adapter: Provide manufacturer's standard adapters for applications requiring:
i. Type A1 one 0 to 90 degree extension tube angle adapter. ii. Type A2 two 0 to 90 degree extension tube angle adapters. b) Top Tube Angle Adapter, Type TA: Reflective 45 degree adjustable Top Tube Angle Adapter, 16 inches (406 mm) long.

Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 10
c) Thermal Insulation Panel: Type TIP, high-performance dual-glazed, thermallybroken tube insulation system. d) Open ceiling trim ring: Type R, ABS Plastic, White; nominal thickness of 0.04 inch (1 mm).

8. Delivery Zone:
a. Diffuser Assemblies for Tubes Not Penetrating Ceilings (Open Ceiling): Solatube Model 750 DS-O. 21 inch (530 mm) diameter diffuser attached directly to bottom of tube. 1) Lens: Type L1, OptiView Fresnel lens design to maximize light output and diffusion.

Visible Light Transmission shall be greater than 90 percent at 0.022 inch (0.5 mm) thick.

Classified as CC2.
2) Diffuser Seal: Open cell foam, acrylic adhesive backed, 0.75 in (19 mm) wide by 0.125 in (3.2 mm) thick to minimize condensation and bug, dirt and air infiltration per ASTM E 283.
3) Diffuser Trim Ring: Injection molded acrylic. Nominal wall thickness 0.172 inches (4.4 mm).

2.3 ACCESSORIES
A. Fasteners: Same material as metals being fastened, non-magnetic steel, non-corrosive metal of type recommended by manufacturer, or injection molded nylon.

B. Suspension Wire: Steel, annealed, galvanized finish, size and type for application and ceiling system requirement.

C. Sealant: Polyurethane or copolymer based elastomeric sealant as provided or recommended by manufacturer.

2.4 OTHER MATERIALS
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the General Contractor subject to the approval of the Architect.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Verify that substrate conditions have no defects or errors which would result in poor or potentially defective application or cause latent defects in workmanship.

3. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

4. Do not proceed with work until unsatisfactory conditions are corrected.

Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 11

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

B. Clean surfaces thoroughly prior to installation.

C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.4 INSTALLATION
A. General:

1. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

2. Coordinate installation with substrates, air and vapor retarders, roof insulation, roofing membrane, and flashing to ensure that each element of the Work performs properly and that finished installation is weather tight.

3. Install flashing to produce weatherproof seal with curb and overlap with roofing system termination at top of curb.

4. Provide thermal isolation when components penetrate or disrupt building insulation. Pack fibrous insulation in rough opening to maintain continuity of thermal barriers.

5. Coordinate attachment and seal of perimeter air and vapor barrier material.

6. Install required tubular shaft transition components to engage skylight at roof down to lens at ceiling.

7. Where metal surfaces of tubular unit skylights will contact incompatible metal or corrosive substrates, including preservative-treated wood, provide permanent separation as recommended by manufacturer

8. Align device free of warp or twist, maintain dimensional tolerances

9. After installation of first unit, field test to determine adequacy of installation. Conduct water test in presence of Owner, Architect, or Contractor, or their designated representative. Correct if needed before proceeding with installation of subsequent units.

10. Inspect installation to verify secure and proper mounting. Test each fixture to verify operation, control functions, and performance. Correct deficiencies.

11. After other trades have completed work on adjacent materials, carefully inspect solotube installation and make adjustments necessary to ensure proper installation and weather-tight conditions.

12. Clean exposed surfaces according to manufacturer's written instructions. Touch up damaged metal coatings and finishes. Remove excess sealants, glazing materials, dirt, and other substances.

Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 12

3.5 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Installer shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.6 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

D. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

E. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

F. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

G. After completion of work in this section, remove all erection equipment and implements of service, and debris; leave entire area in a neat, clean, acceptable condition.

H. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

I. Provide record drawings in accordance with Division 1 closeout submittal procedures.

J. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 08 62 23
Client Name 19six Architects Project No. XXXXX.XX
Project Title HCAi Project #: SXXXXXX-XX-XX
Project Specifications
TUBULAR DATLIGHT DEVICES 08 62 23 - 13
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 1
SECTION 08 71 00 – DOOR HARDWARE
PART 1 - GENERAL

1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions of Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY
A. This Section includes items known commercially as finish or door hardware that are required for swing, sliding, and folding doors, except special types of unique hardware specified in the same sections as the doors and door frames on which they are installed.

B. This Section includes the following, but is not necessarily limited to:

1. Door Hardware, including electric hardware.

2. Storefront and Entrance door hardware.

3. Gate Hardware.

4. Digital keypad access control devices.

5. Power supplies for electric hardware.

6. Thresholds, gasketing and weather-stripping.

7. Door silencers or mutes.

C. Related Sections: The following sections are noted as containing requirements that relate to this Section, but may not be limited to this listing.

1. Division 8: Section - Steel Doors and Frames.

2. Division 8: Section - Wood Doors.

3. Division 8: Section - Aluminum Storefront

4. Division 28: Section - Fire/Life-Safety Systems & Security Access Systems.

1.3 REFERENCES (USE DATE OF STANDARD IN EFFECT AS OF BID DATE.) A. 2022 California Building Code, CCR, Title 24.

B. BHMA – Builders’ Hardware Manufacturers Association
C. CCR – California Code of Regulations, Title 24, Part 2, California State Accessibility Standards.

D. DHI – Door and Hardware Institute
D. NFPA - National Fire Protection Association.

1. NFPA 80 - Fire Doors and Other Opening Protectives

2. NFPA 105 - Smoke and Draft Control Door Assemblies
E. UL - Underwriters Laboratories.

1. UL 10C - Fire Tests of Door Assemblies
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 2

2. UL 305 - Panic Hardware
F. WHI - Warnock Hersey Incorporated
G. SDI - Steel Door Institute

1.4 SUBMITTALS & SUBSTITUTIONS
A. General: Submit in accordance with Conditions of the Contract and Division 1 Specification sections.

B. Submit product data (catalog cuts) including manufacturers' technical product information for each item of door hardware, installation instructions, maintenance of operating parts and finish, and other information necessary to show compliance with requirements.

C. Submit six (6) copies of schedule organized vertically into “Hardware Sets” with index of doors and headings, indicating complete designations of every item required for each door or opening.

Include following information:

1. Include a Cover Sheet with;
a. Job Name, location, telephone number.
b. Architects name, location and telephone number.
c. Contractors name, location, telephone number and job number. d. Suppliers name, location, telephone number and job number. e. Hardware consultant's name, location and telephone number.

2. Job Index information included;
a. Numerical door number index including; door number, hardware heading number and page number.
b. Complete keying information (referred to DHI hand-book "Keying Systems and Nomenclature"). Provision should be made in the schedule to provide keying information when available; if it is not available at the time the preliminary schedule is submitted. c. Manufacturers' names and abbreviations for all materials. d. Explanation of abbreviations, symbols, and codes used in the schedule. e. Mounting locations for hardware.
f. Clarification statements or questions.
g. Catalog cuts and manufacturer’s technical data and instructions.

3. Vertical schedule format sample:

Heading Number 1 (Hardware group or set number – HW
-1)
(a) 1 Single Door #1 -
Exterior from Corridor 101
(b)
90
(c)
RH
(d) 3' 0"x7' 0" x 1-3/4" x
(e) 20 Minute (f) WD x
HM
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 3
(g)
1 (h) (i) ea
(j) Hinges - (k) 5BB1HW

4.5 x 4.5 NRP (l) ½ TMS
(m)
626
(n)
IVE
2 6AA 1
ea
Lockset - ND50PD x
RHO x RH x 10-025 x
JTMS
626 SCH
(a) - Single or pair with opening number and location. (b) - Degree of opening (c) - Hand of door(s) (d) - Door and frame dimensions and door thickness. (e) - Label requirements if any. (f) - Door by frame material. (g) - (Optional) Hardware item line #. (h) - Keyset Symbol. (i) - Quantity. (j) - Product description. (k) - Product Number. (l) - Fastenings and other pertinent information. (m) - Hardware finish codes per ANSI A156.18. (n) - Manufacture abbreviation.

D. Make substitution requests in accordance with Division 1. Substitution requests must be made prior to bid date. Include product data and indicate benefit to the project. Furnish samples of any proposed substitution.

E. Wiring Diagrams: Provide product data and wiring and riser diagrams for all electrical products listed in the Hardware Schedule portion of this section.

F. Keying Schedule: Submit separate detailed schedule indicating clearly how the Owner's final instructions on keying of locks has been fulfilled.

G. Templates for doors, frames, and other work specified to be factory prepared for the installation of door hardware. Check shop drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements.

H. Furnish as-built/as-installed schedule with close-out documents, including keying schedule and transcript, wiring/riser diagrams, manufacturers’ installation and adjustment and maintenance information.

I. Fire Door Assembly Testing: Submit a written record of each fire door assembly to the Owner to be made available to the Authority Having Jurisdiction (AHJ) for future building inspections.

1.5 QUALITY ASSURANCE
A. Obtain each type of hardware (latch and lock sets, hinges, closers, exit devices, etc.) from a single manufacturer.

B. Supplier Qualifications: A recognized architectural door hardware supplier, with warehousing facilities in the project's vicinity, that has a record of successful in-service performance for supplying door hardware similar in quantity, type, and quality to that indicated for this project and that employs an experienced architectural hardware consultant (AHC) who is available to Owner, Architect, and Contractor, at reasonable times during the course of the Work, for consultation.

1. Responsible for detailing, scheduling and ordering of finish hardware.

2. Meet with Owner to finalize keying requirements and to obtain final instructions in writing. To maintain the integrity of patented key systems provide a letter of authorization from the City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 4
specified manufacturer indicating that supplier has authorization to purchase the key system directly from the manufacturer.

3. Stock parts for products supplied and are capable of repairing and replacing hardware items found defective within warranty periods.

C. Hardware Installer: Company specializing in the installation of commercial door hardware with five years documented experience.

D. Fire-Rated Openings: Provide door hardware for fire-rated openings that complies with NFPA Standard No. 80 and requirements of authorities having jurisdiction. Provide only items of door hardware that are listed and tested by UL or Warnock Hersey for given type/size opening and degree of label. Provide proper latching hardware, door closers, approved-bearing hinges and seals whether listed in the Hardware Schedule or not.

1. Where emergency exit devices are required on fire-rated doors, (with supplementary marking on doors' UL labels indicating "Fire Door to be Equipped with Fire Exit Hardware") provide UL label on exit devices indicating "Fire Exit Hardware".

E. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort.

1.6 DELIVERY, STORAGE AND HANDLING
A. Coordinate delivery of packaged hardware items to the appropriate locations (shop or field) for installation.

B. Hardware items shall be individually packaged in manufacturers’ original containers, complete with proper fasteners. Clearly mark packages on outside to indicate contents and locations in hardware schedule and in work.

C. Provide locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, etc.

D. Contractor to inventory door hardware jointly with representatives of hardware supplier and hardware installer until each all are satisfied that count is correct.

1.7 WARRANTY
A. Provide warranties of respective manufacturers’ regular terms of sale from day of final acceptance as follows:

1. Locksets: “ND” Ten (10) years.

2. Electronic: One (1) year.

3. Closers: Thirty (30) years

4. Auto Operators: Two (2 years)

4. All other hardware: Two (2) years.

1.8 MAINTENANCE
A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 5

1.9 PRE-INSTALLATION CONFERENCE
A. Convene a pre-installation conference at least one week prior to beginning work of this section.

B. Attendance: Architect, Construction Manager, Contractor, Security Contractor, Hardware Supplier, Installer, Key Owner Personnel, and Project Inspector.

C. Agenda: Review hardware schedule, products, installation procedures and coordination required with related work. Review Owner’s keying standards.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
Item Manufacturer Acceptable Substitutes
Hinges Ives Hager, Stanley, McKinney
Locks, Latches
& Cylinders Schlage Or Approved Equal
Exit Devices Von Duprin Or Approved Equal
Closers LCN Or Approved Equal
Push, Pulls
& Protection Plates Ives Trimco, BBW, DCI
Flush Bolts Ives Trimco, BBW, DCI
Dust Proof Strikes Ives Trimco, BBW, DCI
Coordinators Ives Trimco, BBW, DCI
Stops Ives Trimco, BBW, DCI
Overhead Stops Glynn-Johnson Or Approved Equal
Thresholds Zero Pemko, National Guard
Seals & Bottoms Zero Pemko, National Guard

2.2 MATERIALS
A. Hinges: Exterior out-swinging door butts shall be non-ferrous material and shall have stainless steel hinge pins. All doors to have non-rising pins.

1. Hinges shall be sized in accordance with the following:
a. Height:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 6
1) Doors up to 42" wide: 4-1/2" inches.
2) Doors 43" to 48" wide: 5 inches.
b. Width: Sufficient to clear frame and trim when door swings 180 degrees. c. Number of Hinges: Furnish 3 hinges per leaf to 7'-5" in height. Add one for each additional 2 feet in height.

2. Furnish non-removable pins (NRP) at all exterior out-swing doors and interior key lock doors with reverse bevels.

B. Continuous Hinges: As manufactured by Ives, an Allegion Company. UL rated as required.

C. Schlage “L” Series as scheduled with “06” Style Lever and “A” Style Rose.

1. Locksets to comply with ANSI A156.13, Series 1000, Operational Grade 1 and Security Grade 1 with all standard trims. Locksets shall also comply with UL10C Positive Pressure requirements

2. Lock case shall be manufactured with heavy 12 gauge steel with fully wrapped design. Lock cases with exposed edges are not acceptable. Lock case shall be multi-functional allowing transformation to a different function without opening lock case.

3. Latchbolt shall have ¾” throw and be non-handed, field reversible without opening the lock case. Solid latchbolts and / or plastic anti-friction devices are not acceptable.

4. The deadbolt, when used, shall be 1” throw stainless steel with a ¾” internal engagement when fully extended.

5. All trim shall be through-bolted with the spring cages supporting the trim attached to the lock cases to prevent torqueing.

6. Levers to have independent rotation in both directions. Exterior lever assembly to be onepiece design attached by threaded bushing. Interior lever assembly shall be attached by screwless shank

7. Thru-bolt lever assemblies through the door for positive interlock. Locks using a through the door spindle for attachment are not acceptable. Spindles shall be independent, designed to “break-away” at a maximum of 75psi torque.

8. Hand of lock chassis to be changeable by simply moving one screw from one side to the case to the other and pulling and reversing the latchbolt.

9. Cylinders to be secured by a cast stainless steel, dual retainer. Locks utilizing screws and / or stamped retainers are not acceptable.

D. Exit devices: Von Duprin as scheduled.

1. Provide certificate by independent testing laboratory that device has completed over 1,000,000 cycles and can still meet ANSI/BHMA A156.3 - 2001 standards.

2. All internal parts shall be of cold-rolled steel with zinc dichromate coating.

3. Mechanism case shall have an average thickness of .140".

4. Compression spring engineering.

5. Non-handed basic device design with center case interchangeable with all functions.

6. All devices shall have quiet return fluid dampeners.

7. All latchbolts shall be deadlocking with ¾” throw and have a self-lubricating coating to reduce friction and wear.

8. Device shall bear UL label for fire and or panic as may be required.

9. All surface strikes shall be roller type and utilize a plate underneath to prevent movement.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 7

10. Lever Trim: “Breakaway” design, forged brass or bronze escutcheon with a minimum of .130” thickness, match lockset lever design.

11. Removable Mullions: Removable with single turn of building key. Securely reinstalled without need for key.

12. Furnish glass bead kits for vision lites where required.

13. All Exit Devices to be sex-bolted to the doors.

14. Panic Hardware shall comply with CBC Section 11B.404.2.7 and shall be mounted between 34" and 44" above the finished floor surface.
a. The unlatching force shall not exceed 5 lbs. applied in the direction of travel.

E. Closers: LCN as scheduled. Place closers inside building, stairs, room, etc.

1. Door closer cylinders shall be of high strength cast iron construction with double heat treated pinion shaft to provide low wear operating capabilities of internal parts throughout the life of the installation. All door closers shall be tested to ANSI/BHMA A156.4 test requirements by a BHMA certified testing laboratory. A written certification showing successful completion of a minimum of 10,000,000 cycles must be provided.

2. All door closers shall be fully hydraulic and have full rack and pinion action with a shaft diameter of a minimum of 11/16 inch and piston diameter of 1 inch to ensure longevity and durability under all closer applications.

3. All parallel arm closers shall incorporate one piece solid forged steel arms with bronze bushings. 1-9/16” steel stud shoulder bolts, shall be incorporated in regular arms, hold-open arms, arms with hold open and stop built in. All other closers to have forged steel main arms for strength, durability, and aesthetics for versatility of trim accommodation, high strength and long life.

4. All parallel arm closers so detailed shall provide advanced backcheck for doors subject to severe abuse or extreme wind conditions. This advanced backcheck shall be located to begin cushioning the opening swing of the door at approximately 45 degrees. The intensity of the backcheck shall be fully adjustable by tamper resistant non-critical screw valve.

5. Closers shall be installed to permit doors to swing 180 degrees.

6. All closers shall utilize a stable fluid withstanding temperature range of 120 degrees F. to -30 degrees F. without requiring seasonal adjustment of closer speed to properly close the door.

7. Provide the manufactures drop plates, brackets and spacers as required at narrow head rails and special frame conditions. NO wood plates or spacers will be allowed.

8. Maximum effort to operate closers shall not exceed 5 lbs., such pull or push effort being applied at right angles to hinged doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the closer may be increased but shall not exceed 15 lbs. when specifically approved by fire marshal. All closers shall be adjusted to operate with the minimum amount of opening force and still close and latch the door. These forces do not apply to the force required to retract latch bolts or disengage other devices that hold the door in a closed position. Per 11B-404.2.8.1, door shall take at least 5 seconds to move from an open position of 90 degrees to a position of 12 degrees from the latch jamb.

F. Flush Bolts & Dust Proof Strikes: Automatic Flush Bolts shall be of the low operating force design.

Utilize the top bolt only model for interior doors where applicable and as permitted by testing procedures.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 8

1. Manual flush bolts only permitted on storage or mechanical openings as scheduled.

2. Provide dust proof strikes at openings using bottom bolts.

G. Door Stops:

1. Unless otherwise noted in Hardware Sets, provide floor type with appropriate fasteners.

Where wall type cannot be used, provide floor type. If neither can be used, provide overhead type.

2. Do not install floor stops more than four (4) inches from the face of the wall or partition (CBC Section 11B-307).

3. Overhead stops shall be made of stainless steel and non-plastic mechanisms and finished metal end caps. Field-changeable hold-open, friction and stop-only functions.

H. Protection Plates: Fabricate either kick, armor, or mop plates with four beveled edges. Provide kick plates 10" high and 2" LDW. Sizes of armor and mop plates shall be listed in the Hardware Schedule. Furnish with machine or wood screws of bronze or stainless to match other hardware.

I. Thresholds: As Scheduled and per details.

1. Thresholds shall not exceed 1/2" in height, with a beveled surface of 1:2 maximum slope.

2. Set thresholds in a full bed of butyl-rubber or polyisobutylene mastic sealant complying with requirements in Division 7 “Thermal and Moisture Protection”.

3. Use ¼” fasteners, red-head flat-head sleeve anchors (SS/FHSL).

4. Thresholds shall comply with CBC Section 11B-404.2.5.

J. Seals: Provide silicone gasket at all rated and exterior doors.

1. Fire-rated Doors, Resilient Seals: UL10C Classified complies with NFPA 80 & NFPA 252.

Coordinate with selected door manufacturers' and selected frame manufacturers' requirements.

2. Fire-rated Doors, Intumescent Seals: Furnished by selected door manufacturer. Furnish firelabeled opening assembly complete and in full compliance with UL10C Classified complies with NFPA 80 & NFPA 252. Where required, intumescent seals vary in requirement by door type and door manufacture -- careful coordination required.

3. Smoke & Draft Control Doors, Provide UL10C Classified complies with NFPA 80 & NFPA 252 for use on “S” labeled Positive Pressure door assemblies.

K. Door Shoes & Door Top Caps: Provide door shoes at all exterior wood doors and top caps at all exterior out-swing doors.

L. Silencers: Furnish silencers for interior hollow metal frames, 3 for single doors, 2 for pairs of doors. Omit where sound or light seals occurs, or for fire-resistive-rated door assemblies.

2.3 KEYING
A. Furnish a Proprietary Schlage masterkey system as directed by the owner or architect. Key system to be designated and combinated by the Schlage Master Key Department even if pinned by the Authorized Key Center, Authorized Security Center or a local authorized commercial dealer.

B. A detailed keying schedule is to be prepared by the owner and/or architect in consultation with a representative of Allegion or an Authorized Key Center or Authorized Security Center. Each keyed City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 9
cylinder on every keyed lock is to be listed separately showing the door #, key group (in BHMA terminology), cylinder type, finish and location on the door.

C. Extend the original Schlage masterkey system established for the project D. Furnish all cylinders in the Full Size Interchangeable Core (FSIC). Pack change keys independently (PKI).

E. Furnish construction keying for doors requiring locking during construction.

F. Furnish all keys with visual key control.

1. Stamp key “Do Not Duplicate”.

2. Stamp (BHMA) key symbol on key.

G. Furnish all cylinders with visual key control.

1. Stamp (BHMA) key symbol on face of cylinder plug (VKC).

H. Furnish mechanical keys as follows:

1. Furnish 2 cut change keys for each different change key code.

2. Furnish 1 uncut key blank for each change key code.

3. Furnish 6 cut masterkeys for each different masterkey set.

3. Furnish 3 uncut key blanks for each masterkey set.

4. Furnish 2 cut control keys cut to the top masterkey for permanent I/C cylinders.

5. Furnish 1 cut control key cut to each SKD combination.

I. Furnish Schlage Padlocks and the cylinders to tie them into the masterkey system for gates, storage boxes, utility valve security, roof hatches and roll-up doors keyed as directed in the keying schedule.

1. Furnish KS43D2200 padlock for use with non-I/C Schlage cylinders. Furnish 47-413 (conventional) or 47-743-XP (PrimusXP) with above.

2. Furnish KS43G3200 padlock for use with FSIC Schlage cylinders. Furnish 23-030 (Classic / Everest) or 20-740 (PrimusXP) with above.

3. Furnish KS41D1200 padlock for use with SFIC Schlage cylinders. Furnish 80-037 (Everest-B) with above.

J. Furnish one Schlage cabinet lock for each cabinet door or drawer so designated on the drawings or keying schedule to match the masterkey system.

1. Furnish CL100PB for use with non-I/C Schlage cylinders.

2. Furnish CL77R for use with FSIC Schlage cylinders.

3. Furnish CL721G for use with SFIC Schlage cylinders.

2.4 FINISHES
A. Generally to be satin chrome US26D (626 on bronze and 652 on steel) unless otherwise noted.

B. Furnish push plates, pull plates and kick or armor plates in satin stainless steel US32D (630) unless otherwise noted.

C. Door closers shall be powder-coated to match other hardware, unless otherwise noted.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 10
D. Aluminum items to be finished anodized aluminum except thresholds which can be furnished as standard mill finish.

2.5 FASTENERS
A. Screws for strikes, face plates and similar items shall be flat head, countersunk type, provide machine screws for metal and standard wood screws for wood.

B. Screws for butt hinges shall be flathead, countersunk, full-thread type.

C. Fastening of closer bases or closer shoes to doors shall be by means of sex bolts and spray painted to match closer finish.

D. Provide expansion anchors for attaching hardware items to concrete or masonry.

E. All exposed fasteners shall have a phillips head.

F. Finish of exposed screws to match surface finish of hardware or other adjacent work.

G. All Exit Devices and Lock Protectors shall be fastened to the door by the means of sex bolts or through bolts.

PART 3 - EXECUTION

3.1 INSPECTION
A. Verify that doors and frames are square and plumb and ready to receive work and dimensions are as instructed by the manufacturer.

B. Beginning of installation means acceptance of existing conditions.

C. Fire-Rated Door Assembly Inspection: Upon completion of the installation, all fire door assemblies shall be inspected to confirm proper operation of the closing device and latching device and that only the manufacturer’s furnished fasteners are used for installation and that it meets all criteria of a fire door assembly per NFPA 80 (Standard for Fire Doors and Other Opening Protectives) 2013 Edition. A written record shall be maintained and transmitted to the Owner to be made available to the Authority Having Jurisdiction (AHJ). The inspection of the swinging fire doors shall be performed by a certified FDAI (Fire Door Assembly Inspector) with knowledge and understanding of the operating components of the type of door being subjected to the inspection. The record shall list each fire door assembly throughout the project and include each door number, an itemized list of hardware set components at each door opening, and each door location in the facility.

3.2 INSTALLATION
A. Install hardware in accordance with manufacturer's instructions and requirements of DHI.

B. Use the templates provided by hardware item manufacturer.

C. Mounting heights for hardware shall be as recommended by the Door and Hardware Institute.

Operating hardware will to be located between 34" and 44" AFF.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 11
D. Set units level, plumb and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper installation and operation.

E. Drill and countersink units that are not factory-prepared for anchorage fasteners. Space fasteners and anchors in accordance with industry standards.

F. Set thresholds for exterior doors in full bed of butyl-rubber sealant.

G. If hand of door is changed during construction, make necessary changes in hardware at no additional cost.

H. Hardware Installer shall coordinate with security contractor to route cable to connect electrified locks, panic hardware and fire exit hardware to power transfers or electric hinges at the time these items are installed so as to avoid disassembly and reinstallation of hardware.

I. Hardware Installer shall also be present with the security contractor when the power is turned on for the testing of the electronic hardware applications. Installer shall make adjustments to solenoids, latches, vertical rods and closers to insure proper and secure operation.

J. All wiring for electro-mechanical hardware mounted on the door shall be connected through the power transfer and terminated in the interface junction box specified for in the Electrical Section.

K. Conductors shall be minimum 18 gage stranded, multicolored. A minimum 12 in. loop of conductors shall be coiled in the interface junction box. Each conductor shall be permanently marked with its function.

L. If a power supply is specified in the hardware sets, all conductors shall be terminated in the power supply. Make all connections required for proper operation between the power supply and the electro-mechanical hardware. Provide the proper size conductors as specified in the manufacturer’s technical documentation.

3.3 ADJUST AND CLEAN
A. Adjust and check each operating item of hardware and each door, to ensure proper operation or function of every unit. Replace units which cannot be adjusted to operate freely and smoothly as intended for the application made.

B. Clean adjacent surface soiled by hardware installation.

C. Final Adjustment: Wherever hardware installation is made more than one month prior to acceptance or occupancy, return to that work area and make final check and adjustment of all hardware items in such space or area. Clean operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment.

D. Instruct Owner's Personnel in proper adjustment and maintenance of hardware finishes, during the final adjustment of hardware.

E. Continued Maintenance Service: Approximately six months after the completion of the project, the Contractor accompanied by the Architectural Hardware Consultant, shall return to the project and re-adjust every item of hardware to restore proper functions of doors and hardware. Consult with and instruct Owner's personnel in recommended additions to the maintenance procedures.

Replace hardware items which have deteriorated or failed due to faulty design, materials or City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 12
installation of hardware units. Prepare a written report of current and predictable problems (of substantial nature) in the performance of the hardware.

3.4 HARDWARE LOCATIONS
A. Conform to CCR, Title 24, Part 2; and ADAAG; and the drawings for access-compliant positioning requirements for the disabled.

3.5 FIELD QUALITY CONTROL
A. Contractor is responsible for providing the services of an Architectural Hardware Consultant (AHC) or a proprietary product technician to inspect installation and certify that hardware and its installation have been furnished and installed in accordance with manufacturers’ instructions and as specified herein.

3.6 SCHEDULE
A. The items listed in the following schedule shall conform to the requirements of the foregoing specifications.

B. While the hardware schedule is intended to cover all doors, and other movable parts of the building, and establish type and standard of quality, the contractor is responsible for examining the Plans and Specifications and furnishing proper hardware for all openings whether listed or not. If there are any omissions in hardware groups in regard to regular doors they shall be called to the attention of the Architect prior to bid opening for instruction; otherwise, list will be considered Complete. No extras will be allowed for omissions.

C. The Door Schedule on the Drawings indicates which hardware set is used with each door.

Abbreviation Name
GLY Glynn-Johnson Corp
IVE H.B. Ives
LCN LCN Commercial Division
SCH Schlage Lock Company
VON Von Duprin
ZER Zero International Inc
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 13
GROUP NO. 01
1 EA CONT. HINGE 112XY TWP 628 IVE
1 EA ELEC PANIC HARDWARE RX-QELX-PA-AX-98-NL-OP-110MD 626 VON 1 EA LONG DOOR PULL 9264F 36" 20" O 630 IVE
1 EA OH STOP 100S 630 GLY
1 EA SURFACE CLOSER 4040XP EDA 689 LCN
1 SET SEAL SET WEATHERSTRIP BY DOOR/FRAME

MANUFACTURER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
GROUP NO. 02
1 EA CONT. HINGE 700 TW8 630 IVE
1 EA ELEC FIRE EXIT HARDWARE RX-PA-AX-98-L-F-M996-06-FSE 626 VON 1 EA RIM CYLINDER 20-057 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA GASKETING 188SBK PSA BK ZER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 14
GROUP NO. 03
1 EA CONT. HINGE 700 TW8 630 IVE
1 EA ELEC PANIC HARDWARE RX-PA-AX-98-L-M996-06-FSE 626 VON 1 EA RIM CYLINDER 20-057 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA GASKETING 188SBK PSA BK ZER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
GROUP NO. 04
1 EA CONT. HINGE 112XY 628 IVE
1 EA PANIC HARDWARE PA-AX-98-EO 626 VON
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 SET SEAL SET WEATHERSTRIP BY DOOR/FRAME

MANUFACTURER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER
GROUP NO. 05
4 EA HINGE 5BB1 4.5 X 4.5 NRP 630 IVE
1 EA PANIC HARDWARE PA-AX-98-L-NL-06 626 VON
1 EA RIM CYLINDER 20-057 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA GASKETING 188SBK PSA BK ZER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 15
GROUP NO. 06
1 EA CONT. HINGE 700 TW8 630 IVE
1 EA EU MORTISE LOCK L9092REU 06A RX CON 12/24 VDC 626 SCH 1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA GASKETING 188SBK PSA BK ZER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
GROUP NO. 07
4 EA HINGE 5BB1 4.5 X 4.5 NRP 630 IVE
1 EA STOREROOM LOCK L9080R 06A 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA GASKETING 188SBK PSA BK ZER
1 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 16
GROUP NO. 08
2 EA CONT. HINGE 112XY EPT 628 IVE
2 EA POWER TRANSFER EPT10 689 VON
1 EA ELEC PANIC HARDWARE RX-QELX-PA-AX-9849-EO-LBL 626 VON 1 EA ELEC PANIC HARDWARE RX-QELX-PA-AX-9849-NL-OP110MD-LBL626 VON 1 EA RIM CYLINDER 20-057 626 SCH
2 EA LONG DOOR PULL 9264F 36" 20" O 630 IVE
2 EA OH STOP 100S 630 GLY
2 EA SURFACE CLOSER 4040XP EDA 689 LCN
1 SET SEAL SET WEATHERSTRIP BY DOOR/FRAME

MANUFACTURER
2 EA DOOR SWEEP 39A A ZER
1 EA THRESHOLD PER DETAIL A ZER

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
GROUP NO. 09
1 EA CONT. HINGE 112XY TWP 628 IVE
1 EA EU STOREROOM LOCK ND80RDEU RHO RX CON 12V/24V
DC
626 SCH
1 EA SURFACE CLOSER 4040XP 689 LCN
1 EA FLOOR STOP FS439 682 IVE

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 17
GROUP NO. 10
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA EU STOREROOM LOCK ND80RDEU RHO RX CON 12V/24V
DC
626 SCH
1 EA SURFACE CLOSER 4040XP 689 LCN
1 EA FLOOR STOP FS439 682 IVE
1 EA GASKETING 188SBK OR BY AL FRAME MFR BK ZER

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
GROUP NO. 11
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA EU STOREROOM LOCK ND80RDEU RHO RX CON 12V/24V
DC
626 SCH
1 EA SURFACE CLOSER 4040XP EDA 689 LCN
1 EA FLOOR STOP FS439 682 IVE

CARD READER - WORK OF DIVISION
28 POWER SUPPLY - WORK OF
DIVISION 28
GROUP NO. 12
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA ENTRANCE/OFFICE LOCK ND50RD RHO 626 SCH
1 EA SURFACE CLOSER 4040XP 689 LCN
1 EA FLOOR STOP FS439 682 IVE
1 EA GASKETING 188SBK OR BY AL FRAME MFR BK ZER
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 18
GROUP NO. 13
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA ENTRANCE/OFFICE LOCK ND50RD RHO 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA GASKETING 188SBK OR BY AL FRAME MFR BK ZER
GROUP NO. 14
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA ENTRANCE/OFFICE LOCK ND50RD RHO 626 SCH
1 EA FLOOR STOP FS439 682 IVE
GROUP NO. 15
4 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA PASSAGE SET ND10S RHO 626 SCH
1 EA FLOOR STOP FS439 682 IVE
GROUP NO. 16
4 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA PASSAGE SET ND10S RHO 626 SCH
1 EA SURFACE CLOSER 4040XP 689 LCN
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
1 EA WALL STOP WS401/402CVX 626 IVE
GROUP NO. 17
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA STOREROOM LOCK ND80RD RHO 626 SCH
1 EA SURFACE CLOSER 4040XP SCUSH 689 LCN
1 EA KICK PLATE 8400 10" X 2" LDW B-CS 630 IVE
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 19
GROUP NO. 18
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA STOREROOM LOCK ND80RD RHO 626 SCH
1 EA FLOOR STOP FS439 682 IVE
GROUP NO. 19
3 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA PRIVACY LOCK W/ OUTSIDE

INDICATOR
ND40S RHO OS-OCC 626 SCH
1 EA SURFACE CLOSER 4040XP 689 LCN
1 EA WALL STOP WS401/402CVX 626 IVE
GROUP NO. 20
6 EA HINGE 5BB1 4.5 X 4.5 652 IVE
1 EA MANUAL FLUSH BOLT FB358 626 IVE
1 EA STOREROOM LOCK ND80RD RHO 626 SCH
2 EA OH STOP 450S 630 GLY
END OF SECTION 08 71 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
DOOR HARDWARE 08 71 00 - 20

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 1
SECTION 08 81 00 – GLASS AND GLAZING
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Glass and glazing.
a. Vision

2. Mirrors

3. Glazing Accessories

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction:
a. All occupancy types.

C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Architectural Manufacturers Association (AAMA), www.aamanet.org

1. AAMA – “Metal Curtain Wall, Window Storefront and Entrance Guide Specifications Manual” E. American National Standards Institute (ANSI), www.ansi.org F. American Society For Testing and Materials (ASTM), www.astm.org

1. ASTM C1036 Flat Glass

2. ASTM C1048 Heat-Treated Flat Glass – Kind HS, Kind FT Coated and Uncoated Glass

3. ASTM E119 Fire Tests of Building Construction and Materials a. Fire barriers over 25% of wall area

4. ASTM E283 Rate of Airflow Through Exterior Windows, Curtain Walls and Doors Under Specified Pressure Differences Across the Specimen

5. ASTM E330 Structural Performance of Exterior Windows, Curtain Walls and Doors by Uniform Static Air Pressure Difference

6. ASTM E331 Water Penetration of Exterior Windows, Curtain Walls and Doors by Uniform Static Air Pressure Difference
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 2

7. ASTM E774 Sealed Insulating Glass Units

8. ASTM E2010 Positive Pressure Fire Tests of Window Assemblies.

9. ASTM E2074 Fire Tests of Door Assemblies, including Positive Pressure Testing of Side-Hinged and Pivoted Swinging Door Assemblies
G. Glass Association of North America (GANA), www.glasswebsite.com H. Flat Glass Marketing Association, "Glazing Manual", most current adopted edition.

I. National Fenestration Rating Council, NFRC, www.nfrc.com J. National Glass Association (NGA), www.glass.org
K. Window and Door Manufacturers Association, (WDMA), www.wdma.org

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Human Impact Loads CBC 2406
Identification CBC Section 2406.3
Safety Glazing
Hazardous Locations
Comply
E.

CBC Section 2406.4
General CBC Section 2401
Definitions CBC Section 2402
General Requirements CBC Section 2403
Glazing
Wind, Snow, Seismic and Dead
Loads on glass
F. Comply
G.

CBC Section 2404
Human Impact Loads CBC Section 2406
Identification CBC Section 2406.3
Mirrors
Hazardous Locations
Comply
CBC Section 2406.4
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

D. Construction Testing:

Item Name of Test Performance Results Testing Std.

Framed glazing system Hose stream test Comply Refer to specific window section
E. Construction Monitoring/Observations by others:

Item Name of Test Performance Results By Whom
Window system
installation
Periodic observation
by window mfgr.

Comply Refer specific window system
section
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 3

1.4 SUBMITTALS AND MOCK-UPS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
D. Submit Manufacturer’s data and shop drawings.

1. Schedule of all glass types with all listed performance criteria a. Technical data substantiating compliance with these specifications.

2. Submit technical data for all sealants and other materials use in completing the work in this section.

E. Submit samples:

1. Five (5) 6" square samples for each required glass and construction type.

F. Certification:

1. Safety rating of glass

2. Fire ratings of glass

3. Technical values of glass

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing/installing/finishing projects of similar size and complexity.

C. Manufacturer shall have been in business for five (5) years providing/installing/finishing projects of similar size and complexity.

D. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid.

E. Stipulations:

1. Glazing in fired rated assemblies shall be labeled for the required fire protection rating and installed in accordance with their listing.

2. Glazing at tempered required locations and designated locations shall bear appropriate designation on glass
F. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

1. Agenda for meeting shall include, but not be limited to:; a. Frames to receive glazing
b. Glazing types

2. General Contractor shall request meeting 5 days in advance of construction.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 4
G. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures.

1. Manufacturer’s representative shall review and certify in writing all phases of construction to verify the complete work meets specification requirements.

2. Written certification of all phases of construction shall be sent to the Architect by the manufacturer’s representative.

H. Miscellaneous criteria:

1. Protect glass from edge damage at all times during handling, and installation.

2. Comply with combined recommendations of glass manufacturer and manufacturer of sealants and other materials used in glazing, except where more stringent requirements are shown or specified.

3. Comply with "Reference Standards" specified above except as shown and specifically recommended otherwise by the manufacturers of the glass and glazing materials.

4. Inspect each piece of glass immediately before installation, and eliminate any, which have observable edge damage or face imperfections.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver glass crated to the jobsite to protect it against scratches, discoloration, breakage, or other damage. Deliver glazing compounds to jobsite in manufacturers factory sealed containers, bearing the brand name. Store materials under cover until their installation.

1.7 JOB CONDITIONS
A. Field-verify that all components, substrates, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

B. Do not proceed with installation of liquid sealants under adverse weather conditions, or when temperatures are below or above manufacturer's recommended limitations for installation.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish manufacturer’s additional five (5) year warranty agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 5
replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to the following:

1. Door lites

2. Window Frames
B. Related Sections include, but are not limited to the following:

1. Division 1

2. Section 08 11 13 – Steel Doors and Frames

3. Section 08 12 16 – Knock Down Aluminum Frames

4. Section 08 14 00 – Wood Doors

5. Section 08 41 00 – Entrances, Window Walls, Storefronts and Curtain Walls

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

1.13 TESTING AGENT
A. Refer to Division 1 for Testing Laboratory service requirements.

B. Refer to specific window frame system specifications.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer.

B. Acceptable manufacturer shall be one of the following and as listed herein and in Drawings:

1. Glazing:
a. PPG, www.ppg.com,
b. Cardinal Glass Corporation, www.cardinalcorp.com
c. Viracon, www.viracon.com
d. As herein specified

2. Window Films:
a. 3M, 800.480-1704, www.glassscapes.com/3m

3. Fire glazing tapes:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 6
a. Pemko, www.pemko.com

4. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS – GLAZING: INTERIOR VISION GLASS TYPES
A. Monolithic:

1. Application:
a. Metal Framed Windows
1) Schedule:
a) Mfgr: PPG www.ppg.com, PPG Glass Configurator
b) Type: Clear Glass (un- coated)
c) Product:
d) Color: Clear
e) Assembly: Single glazing
f) Thickness: 1/4”
g) Performance Data Requirements:
i. Rating: None
ii. Shading Coefficient: Not applicable
iii. U-value: Not applicable
h) Coordinate: Refer to Section(s)
2) Fully tempered safety glass at all locations.
b. Framed Door Vision Lites
1) Schedule:
a. Mfgr: PPG
b. Type: Clear laminated Glass (un- coated)
c. Product:
d. Color: Clear
e. Assembly: Laminated glazing
f. Thickness:
g. Performance Data Requirements:

1. Rating: None

2. Shading Coefficient: Not applicable
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 7

3. U-value: Not applicable
h. Coordinate: Refer to Section 08 14 00 – Wood Doors

2. Fully tempered safety glass at all locations.
c. Storefront locations:
1) Schedule:
a) Manufacturer: PPG , PPG Glass Configurator
b) Type: Clear Glass (un- coated)
c) Product:
d) Color: Clear
e) Performance Data Requirements:
i. Rating: None
ii. Shading Coefficient: Not applicable
iii. U-value: Not applicable
f) Coordinate: Refer to Section 08 41 00

2.3 MATERIALS – GLAZING: EXTERIOR VISION GLASS TYPES
A. Insulated

1. Application:
a. Storefront Windows
1) Type: Insulated units
2) Schedule:
a) Thickness:
i. Insulated: 1” overall with 1/2” airspace
b) IG spacer
i. Spacer® from Edgetech unless unit is not available with this spacer 3) Specifications: Refer also to 1.3 PERFORMANCE, TESTING AND INSPECTION a) Insulated Glazing: (Values for glass unit, not overall window i. Product:
a. Mfgr: Cardinal, www.cardinalcorp.com
b. Product: LoE3 366, LoE² - 272
c. Color: Clear
d. Coating: Low E
e. Type:
i). Tempered at doors
ii). Fully tempered safety glass at all locations indicated and as required by CBC.
f. Fill: Insulated with Argon Fill
g. Performance:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 8
Product Visible Light Fading Transmission
(One lite)
U
Factorwinter
Solar
Blockage Tran
s
Refl.

Ext
Refl
Int
Solar Heat
Gain
Coeff.

Shadin
g Coeff. UV TDW-K TDW
Insulating Glass
LoE³ - 366
#2

0.24 Argon
filled
73% 65% 11% 12% 0.27 0.31 0.05 N/A 0.43
Refer to drawings and as herein specified.
b. Storefront Doors
1) Type: Insulated units
2) Schedule:
a) Thickness:
i. Insulated: 1” overall with ½” airspace
b) IG spacer
i. Spacer® from Edgetech unless unit is not available with this spacer 1) Specifications: Refer also to Performance heading 1.03. a) Insulated Glazing: (Values for glass unit, not overall window) i. Product: Match Storefront Windows
ii. Product:
a. Mfgr: Cardinal
b. Product: LoE3 366, LoE² - 272
c. Color: Clear
d. Coating: Low E
e. Type:
i). Tempered at doors
ii). Fully tempered safety glass at all locations indicated and as required by CBC.
iii). Tempered at all windows and doors
f. Fill: Insulated with Argon Fill
g. Performance:

Product Visible Light Fading Transmission
(One lite)
U FactorwinterSolar
Blockag
e
Trans Refl.

Ext
Refl
Int
Solar Heat
Gain
Coeff.

Shading
Coeff. UV TDW-K TDW
Insulating Glass
LoE³ - 366
#2

0.24 Argon
filled
73% 66% 11% 12% 0.27 0.31 0.05 N/A 0.43
LoE² - 272
#2

0.25 59% 72% 11% 12% 0.41 0.470 0.16 0.33 0.55
c. Metal Framed Windows
1) Type: Insulated units
2) Schedule:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 9
a) Thickness:
i. Insulated: 1” overall with ½” airspace
b) IG spacer
i. Spacer® from Edgetech unless unit is not available with this spacer 3) Specifications: Refer also to Performance heading 1.03. a) Insulated Glazing: (Values for glass unit, not overall window) i. Product:
a. Mfgr: Cardinal
b. Product: LoE3 366, LoE² - 272
c. Color: Clear
d. Coating: Low E
e. Type:
i). Tempered at doors
ii). Fully tempered safety glass at all locations indicated and as required by CBC.
f. Fill: Insulated with Argon Fill
g. Performance:

Product Visible Light Fading Transmission
(One lite)
U FactorwinterSolar
Blockag
e
Trans Refl.

Ext
Refl
Int
Solar Heat
Gain
Coeff.

Shading
Coeff. UV TDW-K TDW
Insulating Glass
LoE³ - 366
#2

0.24 Argon
filled
73% 66% 11% 12% 0.27 0.31 0.05 N/A 0.43
LoE² - 272
#2

0.25 59% 72% 11% 12% 0.41 0.470 0.16 0.33 0.55
Refer to drawings and as herein specified.

2.4 MATERIALS – MIRRORS
A. Schedule:

1. Mfgr: Arch Armour, www.archarmour.net 800.432-8132

2. Type: Clear Glass coated

3. Product: Mirror

4. Color: Mirror reflective

5. Performance Data Requirements:
a. Color: Clear
b. Finish: High luster, highly reflective mirror finish

6. Type: Clear float glass

7. Standards: ASTM C1503-01 Std. Spec. for Silvered Flat Glass Mirror

8. Size: Fabricate from mfgr’s standard sheet sizes.

9. Assembly:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 10
a. Edges: Square unless noted otherwise on drawings.
b. Butt joints: Square
c. Construction: Install all indicated and required drilled holes, face patterns, 1) beveling, edge grinding, etc.
d. Accessories: Provide appropriate devices to mount/hang mirror to 1) substrate with hidden fasteners.

10. Construction:
a. Assembly: (from exposed side)
1) 1st. Glass
2) 2nd. Tin
3) 3rd. Silver
4) 4th. Copper
5) 5th. Roll Coat
6) 6th. Curtain coat

2.5 MATERIALS - ACCESSORIES
A. Sealant: Refer to Section 07 92 00 – Joint Sealants
B. Compounds:

1. Provide hardness of materials recommended by the manufacturer for the required application and condition of installation in each case.

2. Provide only compounds which are known (proven) to be fully compatible with contact surfaces.
a. Extra care shall be used in the selection and use of structural rated sealant.

C. Setting blocks: Neoprene, 70-90 durometer hardness, with proven compatibility with sealants used.

D. Spacers: Neoprene 40-50 durometer hardness, with proven compatibility with sealants used.

E. Compressible filler rod: Closed-cell or waterproof-jacketed rod stock of synthetic rubber or plastic foam, proven to be compatible with sealants used, flexible and resilient, with 5-10 psi compressive strength for 25% deflection. Confirm compatibility with sealants, refer to Section 07 92 00.

F. Cleaners, primers, and sealers: Type recommended by sealant and gasket manufacturer.

G. Glazing gaskets:

1. Use for interior glazing only.

2. Extruded, flexible DuPont Neoprene gaskets of the profile shown.

3. Confirm compatibility with sealant manufacturer.

H. Glazing - Fire tape:

1. Mfgr: Pemko

2. Schedule:
a. FG3000S45 20minute openings 7/16” x 3/64” thick
b. FG3000S90 90minute openings 7/16” x 5/64” thick
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 11

2.6 OTHER MATERIALS
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the General Contractor subject to the approval of the Architect or Owner.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 INSTALLATION
A. General:

1. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

B. Preparation for Glazing

1. Clean the glazing channel, or other framing members to receive glass, immediately before glazing. Remove coatings, which are not firmly bonded to the substrate.

2. Apply primer or sealer to joint surfaces wherever recommended by sealant manufacturer.

C. Glazing

1. Install setting blocks or setting bed of proper size quarter points of sill rabbet. Set blocks or bed material in thin course of the heel-bead compound, if used.

2. Provide spacers inside and out, and of proper size and spacing, for all glass sizes larger than 50 united inches, except where gaskets and pre-shimmed tape are used for glazing. Provide 1/8" minimum bite of spacers on glass and use thickness equal to sealant width, except with sealant tape use thickness slightly less than final compressed thickness of tape. Glass to be 3/16" clear of frame, frame lap to be 5/16" minimum.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 12

3. Voids and filler rods: Prevent exudation of sealant or compound by forming voids or installing filler rods in the channel at the heel of jambs and head (do not leave voids in the sill channels) depending on light size, thickness and type of glass, and complying with manufacturer's recommendations.

4. Do not attempt to cut, seam, or abrade glass, which is tempered, heat strengthened, or coated. Do not nip glass.

5. Force sealants into channel to eliminate voids and to ensure complete "wetting" or bond of sealant to glass and channel surfaces.

6. Glazing of interior window frames:
a. Use pressure or foamed tape and sealant as noted to eliminate rattle and reduce sound transmission. b. Coordinate with window frame manufacturer.

7. Tool exposed surfaces of glazing liquids and compounds to provide a substantial "wash" away from the glass. Install pressurized tapes and gaskets to protrude slightly out of the channel, so as to eliminate innate dirt and moisture pockets.

8. Clean and trim excess glazing materials from the glass and stops or frames promptly after installation, and eliminate stains and discolorations.

9. Where wedge-shaped gaskets are driven into one side of the channel to pressurize the sealant or gasket on the opposite side, provide adequate anchorage to ensure that gaskets will not "walk" out when subjected to dynamic movement. Anchor gasket to stop with matching ribs, or by proven adhesives, including embedment of gasket tail in cured heel head.

D. Cure

1. Cure glazing sealants and compounds in compliance with manufacturer's instructions and recommendations, to obtain high early bond strength, internal cohesive strength and surface durability.

3.6 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.7 TESTING
A. Testing shall be done under each specific window frame specification.

3.8 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Remove and replace glass which is broken, chipped, cracked, and abraded or damaged in other ways during the construction period, including natural causes, accidents and vandalism.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 13
C. Maintain glass in a reasonably clean condition during construction, so that it will not be damaged by corrosive action and will not contribute (by wash-off) to the deterioration of glazing materials and other work.

D. Wash and polish glass on both faces not more than 4 days prior to Owner's Beneficial Occupancy Date.

E. Keep areas of work and building free from accumulated debris, rubbish and waste materials as work progresses.

F. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

2. Remove masking tape immediately after tooling joints, leaving finished work in neat and clean condition.

3. Clean up and leave premise broom clean. Clean adjoining work spotted or otherwise defaced by work of this Section.

G. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

H. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

I. After completion of work in this section, remove all erection equipment and implements of service, and debris. Leave entire area in a neat, clean, acceptable condition.

J. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

K. Provide record drawings in accordance with Division 1 closeout submittal procedures.

L. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END SECTION 08 80 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GLASS AND GLAZING 08 81 00 - 14

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 1
SECTION 09 22 16 – NON-STRUCTURAL METAL FRAMING
PART 1 – GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Metal wall framing – when not included as part of Section 05410 a. Non-load bearing steel wall framing
b. Non-load bearing steel soffit framing
c. Non-load bearing steel ceiling framing
d. Non-load bearing exterior metal soffit framing
e. Miscellaneous metal backing, bridging and metal backing for wall hung items f. Non-load bearing custom fabricated sheet metal assemblies g. Non-load bearing prefabricated headers as applicable h. Non-load bearing metal framing at door frames
i. Non-load bearing metal framing at window frames
j. Insulate inside all built-up headers
k. Painting of all welds
l. Non-load bearing prefabricated metal headers

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

C. Title 24, Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
D. American Institute of Steel Construction (AISC):

1. Manual of Steel Construction, 9th edition
E. American Iron and Steel Institute (AISI)

1. Specifications for the “Design of Cold Formed Steel Structural Members,” most current edition.

F. American Society for Testing and Materials (ASTM):

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 2

1. ASTM 446 Standard Specification for Nickel Chromium

2. ASTM A525 General Requirements for Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process

3. ASTM A553 Standard Specification for Pressure Vessel Plates, Alloy Steel, Quenched and Tempered 8 and 9 Percent Nickel

4. ASTM A570 Standard Specification for Structural Steel, Sheet and Strip, Carbon, HotRolled

5. ASTM A591 Steel sheet, cold-rolled, electrolytic Zinc-Coated.

6. ASTM A653 Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

7. ASTM C754 Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products

8. ASTM C840 Specification for Application and Finishing of Gypsum Board

9. ASTM C1396 Specification for Gypsum Board
G. American Welding Society (AWS):

1. D.1.3, 1981 Structural Welding Code – Sheet Steel

2. Electrodes for Welding
H. Gypsum Association (GA), except where conflicts with drawing requirements, whereas drawings shall govern.

1. Including, but not limited to:
a. GA-600 Fire Resistive Design Manual
I. International Code Council (ICC)

1. ICC Report No. ESR-1663 Hilti Powder Actuated Fasteners

2. ICC Report No. 4943P Bearing and Non-Bearing Steel Studs, Joists And Tracks J. Materials and Methods Standards Association (MMSA), www.mmsa.ws

1. MMSA Bulletins 1 – 16
K. Steel Stud Manufacturers Association (SSMA)

1. Standardization brochures, except where conflicts with drawing requirements, whereas drawings shall govern.
a. ICC # ER-4943P
b. Industry Technical Note, Cold formed Steel Construction, Document 3, April 2000 – Track within a Track Deflection Assembly.
c. Industry Technical Note, Cold formed Steel Construction, Document 1, January 2000 – Steel Deflection Track Selection.
d. Industry Technical Note, Cold formed Steel Construction, Document 2, March 2000 – Unsheathed Flange Bracing.
e. Industry Technical Notes, Cold Formed Steel Construction:
1) No.1, January, 2000 – Single Deflection Track Selection. 2) No.2, March 2000 – Unsheathed Flange Bracing
3) No.3, April 2000 – Track Within A Track Deflection Assembly City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 3

2. Specifications for the “Design of Cold Formed Steel Structural Members”, most current edition.

L. Underwriters Laboratory (UL)

1. Listed UL Design Numbers
M. United States Gypsum Co. (USG Building Systems)

1. Steel framing systems
a. AS-510 Systems folder, except where conflicts with drawing requirements, whereas drawings shall govern.

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Deflection Interior: L/240 CBSC
Wall Loading Interior: 5 psf Design
Interior:
• Typical: Flexible
• Stone or tile veneer: Brittle
Walls (Design unless
noted in drawings
to be more
restrictive)
Wall Type Design
Framing Tolerance 1/8” in 10’-0” non-accumulative Design Ceiling framing – Construction Comply ICC #ER 4943P
damp – wet &
damp areas
Spacing 12” o.c. maximum CBSC/ Design
Lengths Full height of wall extent w/o splices Design
Gauge
Studs
Spacing
As indicated in contract documents,
but never less than required by stud
mfgr. for application requirements
Design and Mfgr.

Refer also to
listed wall
designs
Framing and
accessories
Gauge 20 gauge minimum if not listed
otherwise.

Design
Metal Recycled content 35% minimum
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 4

2. Refer to product criteria identified herein.

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
D. Submit Manufacturer’s data and shop drawings.

1. Submit typed list of all material and products proposed for use, which shall include manufacturer's published technical literature.

2. Framing components:
a. Gauges, widths, flange dimensions, etc.
b. Tracks, runners, backing, etc.

3. Wedge anchor and shot-in anchor capacity to resist lateral and tension loads.

4. Fasteners

5. Welded assemblies

6. Accessories

7. Detailed drawings that explicitly show, indicate and demonstrate all general connection types, profiles and fastening for review and acceptance.
a. Supplemental strapping, bracing, splices, bridging, accessories, and details required for proper installation.

E. Submit samples.

1. N/A
F. Site mock-up, refer to “Mock-Up” heading.

G. Certification:

1. Stud manufacturers written tables for framing heights, loads, spans, etc

2. Provide Certification for percentage of total and post-consumer recycled content.

3. ICC and other applicable reports.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing / installing / finishing projects of similar size and complexity.

C. Manufacturer shall have been in business for five (5) years providing / installing / finishing projects of similar size and complexity.

D. Stipulations:

1. At proprietary assemblies use specified and tested manufacturer and specific products, including but not limited to the gypsum board, fastening, etc.

2. Framing shall be installed and finished by persons regularly engaged in this type of work.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 5
a. Supervision:
1) Provide the services of a qualified and experienced superintendent who shall constantly be in charge of the work of this section and who shall remain at the site at all times that work is in progress.
2) He shall direct all work performed under this Section. b. Qualifications for workmen:
1) Provide persons at all times during execution of this portion of the work who are thoroughly familiar with the type of materials being installed and the best methods for their installation.
c. Damp and wet locations:
1) Framing shall not exceed 12” o.c.
d. Assemblies:
1) Wall system shall provide for movement of components without damage, failure of joint seals, undue stress on fasteners, or other detrimental effects when subject to seasonal or cyclic day/night temperatures.
2) Wall system shall accommodate construction tolerances, deflection of building structural members, and clearances of intended openings.

3. Welders: Qualified for welding in horizontal, vertical, and overhead positions in accordance with AWS D1.3.

4. Perform work in accordance with, but not limited to:
a. Gypsum Association GA-203
b. ASTM C754.
c. SSMA, Steel Stud Manufacturer’s Association, ICC ER-4943P Technical Manual or most current edition
d. Contract Documents and Details
e. ANSI/ASTM A591 - Steel sheet, cold-rolled, electrolytic Zinc-Coated.

E. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work. Agenda for meeting shall include, but not be limited to:

1. Building expansion joints

2. Skin system

3. Wall openings

4. Specialty framing

5. Damp area ceiling framing
F. Miscellaneous Criteria:

1. Inspections
a. As directed Owner’s testing agency may inspect the maintenance of a quality control program including spot checking welds and welding procedures in accordance with AWS.

Standards.
b. Full responsibility for quality control shall remain with the General Contractor.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 6

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Protect metal framing units, components, etc., from rusting, deformation, and other damage.

1. Deliver to project site in manufacturer's unopened containers or bundles, fully identified with name, brand, type and grade.
a. Store off ground in a dry ventilated space or protect with breathable waterproof tarpaulins.

1.7 JOB CONDITIONS
A. Field verify that all components, backing, etc provided by others are installed correctly before proceeding with installation of products as herein specified

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades. ``

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to the following,

1. Wall sheathing and finish

2. Seismic Control

3. Wall assemblies

4. Wall sheathing

5. Attachment to floors and structure

6. Acoustical and fire stopping

7. Ceiling construction

8. Insulation

9. Electrical & low voltage wiring, devices, etc.

10. Electrical work, conduit, etc.

11. Mechanical work, ducts, devices, etc.

12. Recessed components in walls, soffits and ceilings

13. Surface mounted components to walls

14. Wall Backing
B. Related sections include, but are not limited to, the following:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 7

1. Division 1

2. Section 02 41 19 – Selective Building Demolition & Protection

3. Section 05 12 00 – Structural Steel Framing

4. Section 05 50 00 – Metal Fabrications

5. Section 06 10 00 – Rough Carpentry

6. Section 06 17 23 – Parallel Strand Lumber

7. Section 06 17 33 – Wood I-Joist

8. Section 06 18 13 – Glue Laminated Construction

9. Section 08 11 13 – Steel Doors and Frames

10. Section 08 11 16 – Interior Aluminum Doors and Frames

11. Section 09 29 00 – Gypsum Board and Sheathing Substrates

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

PART 2 - PRODUCTS

2.1 MANUFACTURERS
A. Manufacturers shall be subject for compliance with all requirements, provide products from the following list:

1. Stud Manufacturers:
a. Clark Dietrich Metal Framing, www.clarkdietrich.com
b. SCAFCO Steel Stud Manufacturer www.scafco.com
c. Studco Systems, www.studcosystems.com
d. Steeler Construction Supply, www.steeler.com
e. Cemco Steel, www.cemcosteel.com

2. Custom Fabrications:
a. B&R Metal Specialties, www.br-metal.com

3. Fasteners
a. Hilti, www.hilti.com
b. Steeler Inc., www.steeler.com

4. Prefabricated Headers
a. ProX Header by Cemco Steel, www.cemcosteel.com

5. Reviewed Equivalent by Architect.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 8
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. b. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

B. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

C. Refer to drawings, details, and other related specification section whether listed or not.

D. Details shall set basic requirements for size and configuration of systems

2.2 MATERIALS
A. System Components:

1. With each type of metal framing required, provide and install per manufacturer's standard details and specifications, including but not limited to:
a. Standard steel studs, joists, angles, straps, steel runners (tracks), blocking, lintels, clip angles, shoes, reinforcements, fasteners, and accessories as recommended by manufacturer for applications indicated, as needed to provide a complete metal framing system.
b. Custom fabricated channels, angles, etc.
c. Fasteners
1) Mechanical Fasteners: Corrosion-resistant coated, self-drilling, self-threading steel drill screws.
a) Head Type: Low-profile head beneath sheathing, manufacturer’s standard elsewhere.
2) Welded Electrodes: Comply with AWS standards.

B. System Design:

1. Comply with size, gauge and spacing as indicated on the Drawings, conforming with manufacturer’s design tables and in accordance with ICC and or other approved tested systems design as indicated.

C. Materials and Finishes:

1. General:
a. For 20-gauge and lighter units, fabricate metal framing components of commercial quality steel sheet with a minimum yield point of 33,000 psi; ASTM A446, A570, or A611. b. Provide galvanized finish to metal framing components complying with ASTM A525 for minimum G60 coating.

D. Framing Components:

1. Studs:
a. Manufacturer's standard load-bearing steel Studs of size, shape, and gauge indicated on drawings & in conformance with manufacturer’s Structural Property tables.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 9
b. Designator section as required to comply with manufacturer’s Structural Property tables.

2. Joists:
a. Manufacturer's standard Joist sections of size shape, and gauge indicated on drawings & in conformance with manufacturer’s Structural Property tables. b. Designator section as required to comply with manufacturer’s Structural Property tables. c. Damp and wet locations:
1) Framing shall not exceed 12” o.c.

3. Tracks:
a. Straight conditions:
1) General:
a) Manufacturer's standard load-bearing steel tracks of size, shape, and gauge indicated on drawings and in accordance with rated wall design requirements b) Sizes as indicated in contract drawings
c) Custom leg lengths as indicated in drawings and/or details 2) Size:
a) Typical Tracks:
i. Width: To accommodate wall framing
ii. Flange: 1.5” min. length unless indicated otherwise iii. Gauge: 20, min. unless noted to be heavier
b) Deflection Tracks:
i. Width: To accommodate wall framing
ii. Flange: 2” length, unless indicated otherwise
iii. Gauge: 18 min., unless noted to be heavier
c) Slotted Track:
i. Width: To accommodate wall framing
ii. Flange: 2.5”
iii. Gauge: 18 min. unless noted to be heavier

4. Channel Stud: (Coordinate with structural documents for alternate material, profiles, gauges, etc., structural documents shall govern.)
a. Manufacturer's standard load-bearing steel Channel studs of size, shape, and gauge indicated on drawings.

5. Furring Channel: (Hat channel)
a. “FC” Channel: (sizes – unless noted otherwise on drawings)

1. Width: 2.5”

2. Depth: 7/8”

3. Flange: 1/2”
b. Manufacturer's standard load-bearing Furring Channels of size, shape, and gauge indicated on drawings & in conformance with manufacturer's Structural Property tables.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 10
c. Designator section as required to comply with manufacturer’s Structural Property tables.

6. Resilient Channel:
a. “RC” Channel: (sizes – unless noted otherwise on drawings) 1) 2.5” overall width
2) 1/2” deep
3) 1.5” face width
b. Manufacturer's standard load-bearing Resilient Channels of size, shape, and gauge indicated on drawings & in conformance with manufacturer's Structural Property tables.

7. Cold-Rolled Channel:
a. “CR” Channel: (sizes – unless noted otherwise on drawings) 1) Typical application, uno in specifications and/or drawings:
a) 1.5” wide x 1/2” flange x 16 ga.
2) Wall bracing @ 1-5/8” Studs
a) 3/4” web x 1/2” flange x 16 ga.
3) Window opening blocking:
a) 2-1/2” x 1/2” flange x 16GA
b) 3-5/8” x 1” flange x 20GA
c) As indicated in details
b. Manufacturer's standard load-bearing Cold-Rolled Channels of size, shape, and as indicated on drawings.

8. Z-Furring Channel:
a. “ZF” Channel: (sizes – unless noted otherwise on drawings) 1) 7/8” flange for securing to wall
2) 1”, 1.5”, 2” or 3” depth
3) 1.25” face width
b. Manufacturer's standard Z-Furring Channels of size, shape, and gauge indicated on drawings.

9. Angle:
a. Straight conditions:
1) “AN” Angle: (sizes – unless noted otherwise on drawings) a) Standard sizes:
i. 2’ x 2”
ii. 2.5” x 2.5”
2) Custom sizes and gauges as indicated in drawings.
3) Manufacturer's standard Angle of size, shape, and gauge indicated on drawings.

10. Flat stock:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 11
a. “FS” Flat Stock:
1) Size as indicated and required.
b. Manufacturer's Flat Stock of size, shape, and gauge indicated on drawings.

11. Adjustable Wall Furring Bracket:
a. “AWFB” Bracket:
1) 20 ga. galvanized steel material with corrugated edges. 2) 1” wide x 3” long adjustable section x 2” fastening flange. b. Manufacturer's standard load-bearing Adjustable Wall Furring Bracket of size, shape, and gauge indicated on drawings.

12. Header Assembly:
a. Straight conditions:
1) Assembly:
a) Built-up assembly, refer to Drawings and details
b) Prefabricated:
i. Mfgr: Brandy
ii. Series: Pro X Header
iii. Assembly:
a. Single component assembly for desired length and loads. b. Multiple component assembly for desired length and loads c. Clips for securing to jamb framing
iv. Performance:
a. Spans up to 14’-0”
E. Material Thickness: All sections are to be roll formed in various depths with the following minimum bare metal thicknesses: (Refer also to Structural Drawings) Minimum
Thickness (inch)
Minimum Design
Thickness (inch)
Gauge
Mils

0.0179

0.0329

0.0428

0.0538

0.0677

0.0966

0.1180

0.0188

0.0346

0.0451

0.0566

0.0713

0.1017

0.1240
25 20
18 16
14 12
10 18
33 43
54 68
97 118
F. See Drawings for section properties and details.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 12
G. Studs, tracks and joists shall be of the size, shape, and gauge indicated, with a flange and flange return lip as shown on the Structural Drawings. If gauge, flange size, etc. are more restrictive than manufacturer’s guidelines, then Structural Drawings shall govern.

2.3 OTHER MATERIALS
A. Galvanized Repair Paint:

1. Mfgr: ZRC Worldwide, www.zrcworldwide.com, 800.831-3275

2. Product: ZRC ZERO VOC Water-Based Galvanizing Compound

3. Type: Two-pack Water-Based Galvanizing Compound

4. Standards: (Meets or exceeds)
a. ISO 9001 registered
b. MIL-P-26915A (USAF Zinc dust Primer)
c. SSPC-Paint 20 (Specification for Zinc Rich Primer)
d. ASTM Des. A239 Preece Test for hot dipping galvanizing e. ASTM Des B117 10,000 salt spray without failure

5. Material:
a. 93% Zinc in the dry film using Type III “ultra pure” ASTM-D-520 zinc

6. Preparation:
a. Grease & Oils: Solvent clean to SSPC-SP1
b. Rust Scale: Power tool clean to SSPC-SP3 or SSPC-SP11 (SIS St. 2 or 3) 1) Sand blast (SSPC-SP6) at exterior exposed conditions. c. Mill Scale: Sandblast to SSPC-SP6
d. Water Immersion: (100 degree F max.) Sandblast to SSPC-SP10 (near-white) B. Welding Electrodes: E60XX
C. Metal Backing Plates

1. Horizontal 'C'- Studs 6" x 18 gauge x distance between vertical supporting studs 3 studs minimum). Refer to indicated details (for surface mounted items furnished by others).

2. Alternate when approved is 6” x 16 gauge steel plate continuous and spanning minimum two (2) studs past mounting location to each side.

2.4 METAL FRAMING AT DOOR & WINDOW JAMBS & HEADS
A. Comply with all requirements of 2.02 in addition to those listed here.

1. Jambs:
a. Provide double stud framing at all jambs, 20-gauge min. metal studs unless wall type requires a heavier stud and shall be spot-welded together at 6" O.C. (stud gauge shall not be less than wall stud framing gauge)
b. Jamb framing shall frame full height of wall such that jamb framing incorporates and attaches to built-up header.
c. Where cutouts are required at door jambs for hardware, etc., then install a third jamb stud to reinforce jamb framing.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 13

2. Header:
a. Provide built-up double joist header at all heads conditions.

1. 20 gage min. metal studs and shall be fastened together (stud gauge shall not be less than wall stud framing gauge.
a) Heavier gauge where noted in drawings.
b) Heavier gauge when required by manufacturer for specific condition.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

3. Do not proceed until unsatisfactory conditions are corrected.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 FABRICATION
A. General:

1. Fabricate panels plumb, square, true to line and braced against racking with joints welded.

2. Perform lifting of prefabricated panels in a manner to prevent damage or distortion B. Fastenings:

1. Attach similar components by welding or screw fasteners as indicated on structural drawings.

C. Fabrication Tolerances:

1. Fabricate framing not to exceed a maximum allowable tolerance variation from plumb, level and true to line of 1/8” in 10’-0”.

D. Install as detailed, herein specified and in accordance with manufacturers recommendations.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 14

3.5 INSTALLATION
A. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

B. Accurately layout partition and wall lines from the dimensions shown on Contract Drawings.

C. Install metal studs (NOT TO EXCEED 24 INCHES O.C. SPACING.) and accessories in strict accordance with manufacturer's recommendations, unless otherwise shown or specified; anchoring all components firmly into position.

D. Furring and bracing members: Same material and finish as studs, thickness to suit purpose.

E. Extend partition through suspended ceiling line to structural deck above, unless specifically noted otherwise.

F. Isolation of partitions: Provide slip or cushion-type joint between metal framing and structure to prevent transfer of structural loads or movements to partitions, except as otherwise indicated.

G. Studs: Use full-length studs between runner tracks. Friction fits studs to runner tracks by positioning and rotating into place. Provide positive attachment to runner tracks for studs; using #10x20x3/8" min. Pan Head self-tapping screws in both flanges of studs top and bottom.

1. Size and spacing: Use studs of the sizes and spacing indicated.

2. Provide additional studs to support inside corners at partition intersections and corners, and to support outside corners, termination of partitions and both sides of control joints.

3. Provide rough framing at openings, except doors, consisting of full-length studs adjacent to jambs, and horizontal header and sill tracks. Cut horizontal tracks to length and split flanges and bend webs at ends for flange overlap and screw to jamb studs. Install cut-to-length, intermediate studs above and below openings, at same spacing as full-length studs.

4. At door frames, provide two 18 gauge structural studs continuous at each side of openings and provide one additional stud located not more than 6" from jamb stud. Fasten jamb studs to metal frames with anchor clips using 2 self-tapping screws or bolts one each side. (3 clips minimum per jamb each side; 2 clips minimum at head). Clips not to exceed 24 inches on center.

5. At electrical cabinets and panel boards, provide one 18 gauge H.D.S. structural stud continuous at end side of opening for mounting fixture.

6. Where partitions will support ceramic tile, fixtures and wall cabinets, use 18 gauge "C"-studs, unless otherwise noted.

7. Shaft walls, install per listed design and in accordance with manufacturers system.

H. Provide rigid metal furring channels where gypsum board is to be applied over concrete substrates, except where full size studs are indicated.

1. Install channels at 16" O.C. maximum and provide additional framing at openings, cutouts, and corners. Fasten to concrete with concrete nails or power-driven fasteners not more than 24" O.C. and stagger on opposite flanges of hat-shaped channels.

I. Where connections of metal framing are indicated to be welded, all such welding shall be performed by certified welders and then tested in accordance with Code requirements.

J. Metal Backing Plates: Shall be applied as detailed and in locations as indicated on Drawing floor plans and interior room elevations.

K. Prepare and paint all welds with galvanized paint as herein specified.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 15

3.6 TOLERANCES
A. Install members to provide surface plane with maximum variations of 1/8 inch in 10 feet in any direction.

3.7 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

1. Galvanizing Repairs:
a. Prepare and repair damaged galvanized coatings on fabricated and installed metal framing with galvanizing repair paint according to ASTM A780 and the manufacturer’s instructions.
b. Prepare and repair galvanized coatings on welds as part of fabricated and installed metal framing with galvanizing repair paint according to ASTM A780 and the manufacturer’s instructions.

2. Touch-up painting:
a. Wire brush, clean, and paint scarred areas, welds, and rust spots on fabricated and installed prime-painted metal framing.

1. Touch-up painted surfaces with same type of shop paint used on adjacent surfaces.

F. Provide final protection and maintain conditions in a manner acceptable to manufacturer and installer to ensure that metal framing is without damage or deterioration at the time of Substantial Completion.

G. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

H. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

I. Provide record drawings in accordance with Division 1 closeout submittal procedures.

J. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
NON-STRUCTURAL METAL FRAMING 09 22 16 - 16
END SECTION 09 22 16
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 1
SECTION 09 29 00 – GYPSUM BOARD AND SHEATHING SUBSTRATES PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions at the job site.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Gypsum wallboard and sheathing

2. Joint treatment

3. Surface treatment

4. Sealants and Backer rod

5. Drywall Primer / Sealer

6. Related accessories

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Society for Testing and Materials (ASTM) www.astm.org

1. ASTM C 36 Specification for Gypsum Wallboard

2. ASTM C 79 Specification for Gypsum Sheathing - Paper faced (Glass mat faced, see ASTM C1177)

3. ASTM C 473 Standard Test Methods for Physical Testing of Gypsum Panel Products

4. ASTM C 475 Standard Spec for Joint Compound & Joint Tape for Finishing Gypsum Board

5. ASTM C 518 Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus

6. ASTM C 840 Standard Spec for Application and Finishing of Gypsum Board a. Comply with applicable requirements including recommendations of manufacturer, and comply with more restringent specifications as herein specified.

7. ASTM C 931 Specification for Exterior Gypsum Soffit Board

8. ASTM C 1177 Standard Spec for Glass Mat Gypsum Substrate for Use as Sheathing City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 2

9. ASTM C 1178 Standard Spec for Glass Mat Water-Resistant Gypsum Backing Panel

10. ASTM C1396 Specification for Gypsum Board

11. ASTM D 3273 Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber

12. ASTM E 72 Standard Test Methods of Conducting Strength Tests of Panels for Building Construction

13. ASTM E 96 Standard Test Methods for Water Vapor Transmission of Materials E. Gypsum Association (GA) www.gypsum.org

1. GA-214 Recommended Levels of Gypsum Board Finish

2. GA-216 Specifications for the application and Finishing of Gypsum Board

3. GA-220 Gypsum Board Winter Related Installation Recommendations

4. GA-221 Repair of Gypsum Board Joint Ridging

5. GA-223 Gypsum Panel Products Types, Uses, Sizes, And Standards

6. GA-224 Installation of Predecorated Gypsum Board

7. GA-225 Repair of Fire-Rated Gypsum Board Systems

8. GA-226 Application of Gypsum Board To Form Curved Surfaces

9. GA-229 Shear Values for Screw Application OF Gypsum Board On Walls

10. GA-231 Assessing Water Damage to Gypsum Board

11. GA-232 Painting New Gypsum Board

12. GA-234 Control Joints For Fire-Resistant Rated Systems

13. GA-235 Gypsum Board Typical Mechanical and Physical Properties

14. GA-238 Guidelines for Prevention Of Mold Growth On Gypsum Board

15. GA 253 Application Of Gypsum Sheathing

16. GA-254 Fire-Resistant Gypsum Sheathing

17. GA-276 Gypsum Board Roof Underlayment Systems

18. GA-290 Gypsum Board Area Separation Walls

19. GA-530 Design Data - Gypsum Board

20. GA-600 Fire resistant Design Manual

21. GA-605 Proprietary Gypsum Panels Products For Use In UL Classified Systems

22. GA-610 Fire resistance Provided By Gypsum Board Membrane Protection

23. GA-618 Building and Inspecting Smoke Barriers

24. GA-620 Gypsum Area Separation Firewalls

25. GA-801 Handling and Storage of Gypsum Panel Products F. International Code Council (ICC), www.iccsafe.org
G. United States Gypsum (USG) www.usg.com

1. SA927 Application And Finishing Of Gypsum Panel Products

2. SA923 Drywall/Steel Framed Systems

3. SA924 Drywall/Wood Framed Systems

4. SA925 USG Area Separation Fire Wall/Party Wall Systems

5. SA926 USG Cavity Shaft Wall Systems

6. SA933 “Sheetrock” Brand Textures and Finish Products H. Federation of Societies for Coating Technology (FSCT) www.coatingssocietiesinternational.org

1. Coatings Encyclopedic Dictionary
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 3
I. Painting and Decorating Contractors of America (PDCA) www.pdca.org

1. Standard P1-92 Touch Up Painting and Damage Repair

2. Standard P4-94 Responsibility for Inspection and Acceptance of Surface Prior to Painting and Decorating

3. Standard P5-94 Benchmark Sample Procedures for Paint and Other Coating System

4. Glossary of Terms, Painting and Decorating Contractors of America, Fairfax, VA.

J. Drywall Finishing Council Incorporated (DWFC) www.dwfc.org

1. Recommended Specification for Preparation of Gypsum Board Surfaces Prior to Texture Application.

2. Interior Job Condition Specifications for the Application of Drywall Joint Compounds, Drywall Textures, and Paint/Coatings.

K. National Evaluation Report (NER)

1. NER 458 Code Compliance for Exterior Ceiling Sheathing (Soffit sheathing)

1.3 PERFORMANCE
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Gypsum Board /
Sheathing &
Sound Board
Flatness Tolerance 1/8” offsets between
planes of board faces
and 1/8” in 10 feet or
plumb, level, warp and
bow. Tolerance
variation shall not be
collective.

Gypsum
Association
Recommended Levels of Gypsum
Board Finish
GA-214-07
ANSI A98-7.1
Application and Finishing of Gypsum
Panel Products
GA-216-07
Gypsum Board Winter Related
Installation Recommendations
GA-220-06
Repair of Gypsum Board Joint Ridging GA-221-00
Repairing Screw or nail Pops GA-222-08
Gypsum Panel Products Types, Uses,
Sizes and Standards
GA-223-04
Installation of Pre-decorated Gypsum
Board
GA-224-08
Gypsum Board /
Sheathing
Repair of Fire-Rated Gypsum Board
Systems
Comply or as herein
specified, whichever is
more restrictive
GA-225-08
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 4
Application of Gypsum Board to Form
Curved Surfaces
GA-226-08
Shear Values for Screw Application of
Gypsum Board on Walls
GA-229-08
Assessing Water Damage to Gypsum
Board
GA-231-06
Painting New Gypsum Board GA-232-04
Control Joints for Fire-Resistance Rated
Systems
GA-234-08
Gypsum Board Typical Mechanical and
Physical Properties
GA-235-05
Joint Treatment Under Extreme
Weather Conditions
GA-236-00
Guidelines for Prevention of Mold
Growth on Gypsum Board
GA-238-03
Water-Resistant Gypsum Backing
Board For Ceramic Tile in Wet Areas
GA-239-04
Application of Gypsum Sheathing GA-253-07
Fire-Resistant Gypsum Sheathing GA-254-07
Gypsum Board Roof Underlayment
Systems
GA-276-05
Gypsum Board – Area Separation Walls GA-290-02
Fire Resistance Design Manual GA-600-06
Proprietary Gypsum Panel Products For
Use in UL Classified Systems
GA-605-08
Fire Resistance Provided by Gypsum
Board Membrane Protection
GA-610-02
Building and Inspecting Smoke Barriers GA-618-04
Handling and Storage of Gypsum Panel
Products: A Guide for Distributors,
Retailers, and Contractors
GA-801-07
Exposed interior
Gypsum
Sheathing
Smooth Wall
Smooth Wall /
Level 5
Smooth Wall with Darby full surface
float
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

D. Definitions:

1. Levels of gypsum board finish: (Typical)
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 5
a. Scope. The required level of finish of gypsum board wall and the ceiling surfaces is described with typical applications and is listed as a minimum allowable standard. All proposed deviations from these herein specifications shall be in written form of a request and approved by the Architect prior to installation.
b. Terminology. The following definitions are applicable to this document.

1. Accessories: Metal or plastic beads, trim or molding used to protect or conceal corners, edges or abutments of the gypsum board construction.

2. Back Roll: Rolling a spray painted surface with a paint roller immediately following spray application.

3. Coat: Paint, Varnish, or lacquer applied to a surface in a single application (one Layer) to form a properly distributed film when dry –ASTM
Note: Shall be applied as installed per Painting specification.

4. Critical (Severe) Lighting: A condition whereby interior surfaces are flooded by natural or artificial lighting at an oblique angle; such as lighting from large expanses of windows, glass curtain walls, skylights, or surface mounted light fixtures. Strong side lighting from windows or surface-mounted light fixtures. - ASTM
Note: See “comments” section of this document.

5. Drywall Primer: A paint material specifically formulated to fill the pores and minimize suction differences between gypsum board surfaces paper and the compound used on finished joints, angles, fastener heads, accessories, and over skim coating.

Note: this shall be applied as part of gypsum board specification

6. Gloss: A subjective term used to describe the relative amount and nature of mirror like (specular) reflection.

Note: FSCT

7. Joint Photographing (Telegraphing): The shadowing of the finished joint areas through the surface decoration and/or Smooth Wall
Note: Syn telegraphing. – GA-214-96

8. Paint: Any pigmented liquid, liquefiable, or mastic composition designed for application to a substrate as a thin layer which is converted to an opaque solid film after application.

Used for protection, decoration or identification or to serve some functional purpose, such as filling or concealing surface irregularities.

Note: FSCT, shall be applied as part of painting specification

9. Properly Painted Surfaces: A surfaces that is uniform in appearance, color and sheen. It is one that is free of foreign material, lumps skins, runs, sags, holidays, misses, strikethrough, or insufficient coverage. It is a surface, which is free of drips, spatters, spills, or overspray, which were caused by the General Contractor’s work force. Compliance to meeting the criteria of a “Properly painted surface” shall be determined when viewed without magnification at a distance of five feet or more under normal lighting conditions and form a normal viewing position.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 6
Note: A surface uniform in appearance, color and sheen may not be achieved with a coat of primer or a single coat of topcoat. Shall be applied as part of Painting specification. – PDCA

10. Prime/Sealer: A gypsum board prime/sealer manufactured by company explicitly for priming gypsum board and formulated to fill the pores and equalize the suction difference between gypsum board surface paper and the compound used on finished joints, angles, fastener heads, and accessories, and over skim coatings. See “comments” section of this document.

Note: Primer shall be provided by Gypsum board mfgr. and installed by gypsum board finisher in addition to “primer and finish paint as installed under separate specification Section 09 90 00.”

11. Skim Coat: A thin coat of herein listed joint compound installed over the entire surface of the gypsum board to fill imperfections in the joint work, smooth the paper texture, and provide a uniform surface for a Smooth Wall appearance. Compound will be installed with Steel Trowel or Knife blade.

Note: Spray application is not allowed

12. Spotting: To cover fastener head with joint compound.

13. Texture: A decorative treatment of gypsum board surfaces.

14. Texturing: Regular or irregular patterns typically produced by applying a mixture of joint compound and water, or proprietary texture materials including latex base texture paint, to a gypsum board surface previously coated with primer/sealer.

Note: Refer to Heading 2.05

15. Top Coat: The finish coat(s) of a coating system, formulated for appearance and or environmental resistance.

Note: shall be applied as part of painting specification – PDCA

16. Wall covering: Any type of paper, vinyl, fabric, or specialty material that is pasted onto a wall or ceiling in a wide array of colors, patterns, textures, and performance characteristics, such as washability and abrasion resistance.

Note: shall be applied as part of wall covering specification - FSCT

17. Wall covering Primer: Coatings formulated to seal the porosity of new drywall, joint compounds, and most surfaces. Also formulated to promote adhesion and serviceability under wall covering products.

Note: Shall be applied as part of wall covering specification.

1.4 SUBMITTALS AND MOCK-UPS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 7
D. Submit Manufacturer’s data and shop drawings.

1. Drywall products

2. Joint tapes for Interior and Exterior applications

3. Joint topping material

4. Skim coat joint compound material – Smooth wall Level 5

5. Fasteners

6. Tools for product application

7. Texturing products
E. Submit samples.

1. Three (3) each 20” square portable mockups on gypsum board that include:
a. Finish taping, mud and primer
b. Butt joint treatment
c. Edge treatment
d. Specific required finishes
F. Site mock up, refer to “Field Samples / Mock Up” heading.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing/installing/finishing similar size projects and complexity.

C. Manufacturer shall have been in business for five (5) years providing/installing/finishing similar size projects and complexity.

D. Lead Times:

1. General Contractor shall coordinate with supplier to verify product lead times during bids and at award of contract, and account for such lead times in their costs and schedules.

2. General Contractor shall provide an itemized list of materials which might have or are confirmed to have a lead time problem and what the anticipated lead time is.

3. General Contractor shall certify in writing that all materials have acceptable lead times as they relate to availability for sub-contractor and General Contractor to meet construction schedule and sequence of construction.

4. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must me documented at time of bid.

E. Stipulations:

1. At proprietary assemblies use specified and tested manufacturer and specific products, including but not limited to the gypsum board, fastening, etc.

F. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

1. Agenda for meeting shall include, but not be limited to; review of Smooth wall, taping for various wall coverings and texture of wall.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 8

2. General Contractor shall request meeting 5 days in advance of construction.

G. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation membrane waterproofing work to review installation procedures.

1. Manufacturer’s representative shall review and certify all phases of construction to verify the complete work meets specification requirements.

2. Written certification of all phases of construction shall be sent to the Architect by the manufacturer’s representative.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Comply with manufacturers recommendations

1.7 JOB CONDITIONS
A. Field-verify that all components, substrates, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

B. Environmental:

1. Interior: Do not install gypsum board, joint compounds, skim coats and textures if building temperature is below 55ºF or if proper ventilation is not provided to eliminate excessive moisture from building.
a. Temperature shall be maintained after installation.

2. Exterior: Do not install gypsum board, joint compounds, skim coats and textures if the exterior temperature is below 45ºF.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Wall Framing
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 9

2. Electrical/Low Voltage Wiring & Devices

3. Wall Finish for Mechanical Work

4. Wall coverings

5. Rated wall penetrations

6. Acoustical wall assemblies and penetrations
B. Related Sections include, but are not limited to, the following:

1. Division 1

2. Section 05 40 00 – Cold-Formed Metal Framing

3. Section 05 50 00 – Miscellaneous Metal Fabrications

4. Section 09 22 16 – Non-Structural Metal Framing

5. Section 09 90 00 – Paints and Coatings

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

PART 2 – PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer for each product type.

B. Acceptable manufacturers shall be one of the following and as herein listed and in Drawings:

1. Gypsum sheathing (Interior):
a. Typical and as indicated:
1) Georgia Pacific (GP), www.gp.com
2) U.S Gypsum (USG), www.usg.com
3) National Gypsum, Gold Bond www.national-gypsum.com
b. Where indicated:
1) U.S Gypsum (USG), www.usg.com
c. Alternates where allowed:
1) National Gypsum, Gold Bond & GridMarx, www.national-gypsum.com 2) Pabco Gypsum, www.pabcogypsum.com

2. Joint treatment & finishing
a. U.S Gypsum (USG), www.usg.com
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 10
b. National Gypsum, Gold Bond www.national-gypsum.com
c. Georgia Pacific (GP), www.gp.com
d. Bead-Ex www.usg.com
e. Hamilton www.hamiltonnw.com

3. Accessories:
a. U.S Gypsum (USG), www.usg.com
b. National Gypsum, Gold Bond & GridMarx, www.national-gypsum.com c. Superior Metal Trim www.superiormetaltrim.com
d. Flannery, Inc., 818 837-7585, www.flannerytrim.com
e. Fry Reglet www.fryreglet.com
f. MILGO/BUFKIN, www.milgo-bufkin.com

4. Sealants:
a. Pecora, www.precora.com
b. Refer also to Sealant Specification Section 07 92 00.

5. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. General

1. Conform to American National Standards Institute Specifications and Gypsum Association for Gypsum Wallboard finishes.

2. Sheathing type as herein specified and in accordance with manufacturer’s recommendations.

3. Wall board shall be fire-rated typical, Type ”X” typical, U.N.O. and comply with specified and detailed wall construction types.

B. Wallboard & Ceiling Board Sheathing

1. INTERIOR SCHEDULE:
a. General:
1) Type X Core, Fire Code C and/or Type XXX regarding if application is a rated assembly b. Interior walls, U.N.O.:
1) Mfgr:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 11
a) Typical: Georgia Pacific
b) Alternate 1: US Gypsum
c) Alternate 2: Pabco
d) Alternate 3: Nation Gypsum, Gold Bond
2) Brand:
a) Typical: ToughRock®Fireguard Type X
b) Alternate 1: Sheetrock
c) Alternate 2: Pabco
d) Alternate 3: Fire Shield
3) Product:
a) Typical: Type “X” Core
b) Alternate 1: Firecode “C” Core (if specific to approved design) c) Alternate 2: Flame Curb
4) Size:
a) Thickness:
i. 5/8” typical
ii. 1/2” as indicated per plan details
b) Width x Length: 4’-0” wide x 8’, 9’, 10’, 12’ or 14’ (size to minimize quantity of joints) 5) Material: Paper faced gypsum core board
6) Edge: Tapered
7) Standard: ASTM C36
8) Finish: As herein specified and indicated in drawings 9) Limitations:
a) See body of this specification for specific product types for specific conditions. b) At interior face of Exterior walls use Dens Armour Plus Fireguard, High Performance Interior Panel as herein specified unless herein in indicated otherwise or an herein approved alternate.
c. Interior Face of Exterior Walls:
1) Application: Wall Sheathing
a) Full height from floor to underside of roof decking. b) Exposed and concealed conditions
2) Schedule: Full Height
a) Material:
i. Schedule:
a. Mfgr: Georgia Pacific
b. Product: DensArmor Plus® Fireguard® Type X, High Performance Interior Panel
c. Size: 5/8”x 4’-0”x 8’ & 10’ (size to minimize quantity of joints) City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 12
d. Material: Gypsum sheathing with inorganic coated glass fiber mats on each face
e. Edge: Tapered
f. Rating: Type “X”
ii. Alternate product:
a. Mfgr: National Gypsum
b. Product: Gold Bond Fire-Shield
c. Size: 5/8” x 4’-0” x 8’ & 10’ (size to minimize quantity of joints) d. Material: Gypsum sheathing with inorganic coated glass fiber mats on each face
e. Edge: Tapered
f. Rating: Type “X”
b) Limitations:
i. Do not use at the following locations requiring other sheathing as herein specified under the ‘Wallboard & Ceiling Board for Interior conditions. a. Curved walls – Specialty board - Non rated:
b. Curved walls – Non rated:
c. Shaft wall sheathing:
d. Abuse-resistant Impact locations – Moderate Duty:
e. Abuse-resistant Impact locations – Heavy Duty:
f. Wet locations – Showers:
g. Shaft wall sheathing:
h. Veneer wall and ceiling – non shower locations
i. Cement Plaster substrate:
j. Fully adhered Natural Stone substrate
k. Sound Damping Wall board:
l. Sound Damping Ceiling board:
m. Modular Brick Substrate
3) Finish: As herein specified and indicated in drawings including skim coat over entire surface prior to finishing.
d. Damp locations: (Non tile veneer conditions)
1) Application:
a) Toilet room walls & ceilings
b) Janitor room walls & ceilings
c) Locker rooms
d) Lounges and other rooms within the extents of Shower/Locker rooms 2) Schedule: Full Height
a) Material:
i. Mfgr: Georgia Pacific
ii. Product: DensArmor Plus® Fireguard® Type X, High Performance Interior Panel
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 13
iii. Size: 5/8”x 4’-0”x 8’ & 10’(size to minimize quantity of joints) iv. Material: Gypsum sheathing with inorganic coated glass fiber mats on each face
v. Edge: Tapered
vi. Rating: Type “X”
vii. Joints: Self adhering fiberglass mesh tape and approved tapping compound 3) Limitations:
a) Maximum ceiling framing not to exceed 12” o.c.
b) Do not use at shower ceilings, use Dens Shield Tile Guard (Backer Board) c) Do not use at shower walls, use Dens Shield Tile Guard (Backer Board) 4) Standards: ASTM C630
5) Finish: As herein specified and indicated in drawings e. Wet locations – Showers and water walls:
1) Applications:
a) Shower room walls and ceilings with Tile veneer
i. Schedule:
a. Mfgr: Georgia Pacific
b. Product: DensShield® Fireguard® Type X Tile Backer
c. Size: 5/8” x 4’-0” wide x 4’’, 5’, & 8’ (size to minimize quantity of joints)
d. Material: Surface coated fiberglass and silicone-treated core e. Edge: Square
f. Joints: Self adhering fiberglass mesh tape and approved tapping compound
g. Rating: Type X, UL approved for 1-hour wall construction h. Joints: Self adhering fiberglass mesh tape and approved tapping compound
ii. Note: Waterproof liquid applied membrane, joint mesh and accessories; refer to Tile specifications.
b) Shower ceilings without Tile veneer
i. Schedule:
a. Mfgr: Georgia Pacific
b. Product: DensShield Tile Guard (Backer Board)
c. Size: 5/8” x 4’-0” wide x 4’’, 5’, & 8’ (size to minimize quantity of joints)
d. Material: Surface coated fiberglass and silicone-treated core e. Edge: Square
f. Joints: Self adhering fiberglass mesh tape and approved tapping compound
g. Rating: UL approved for 1-hour wall construction
h. Finish: Skim Coat for Level 5 finish
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 14
i. Note: Water proof liquid applied membrane, joint mesh and accessories; refer to Tile specifications.
f. Thin Veneer Wall and Ceiling Sheathing – non shower locations 1) Application:
a) Ceramic Tile veneer
2) Schedule Options:
a) Option 1:
i. Mfgr: Georgia Pacific
ii. Product: DensShield® Fireguard® Type X Tile Backer
iii. Size: 5/8” x 4’-0” wide x 4’’, 5’, & 8’ (size to minimize quantity of joints) iv. Material: Surface coated and silicone-treated core
v. Edge: Square
vi. Rating: Type X, approved for 1-hour wall construction vii. Limitations: Maximum 16” o.c. framing spacing at Restroom ceilings viii. Finish: Level 4
ix. Joints: Self adhering fiberglass mesh tape and approved tapping compound b) Option 2:
i. Mfgr: USG
ii. Product: Fiberock Aqua Tough Interior Panel
iii. Size: 5/8” x 4’-0” wide x 4’’, 8’, & 12’ (size to minimize quantity of joints) iv. Material: High density paperless gypsum and cellulose wall panel v. Edge: Tapered
vi. Tape: Sheetrock® brand joint tape – heavy use type
vii. Rating: UL approved for 1-hour wall construction
viii. Finish: Level 4 finish
ix. Joints: Self adhering fiberglass mesh tape and approved tapping compound

2.3 OTHER MATERIALS
A. Accessories: Trim accessories, including, but not limited to:

1. Joint treatment: Refer to Heading 2.04

2. Outside edge:
a. Mfgr: USG
b. Product: DUR-A-BEAD Corner Bead
c. Material: Standard galvanized steel units
d. Model: No.103 1-¼” x 1-¼”

3. Inside corner:
a. Mfgr: USG
b. Product: Sheetrock Brand
c. Material: Paper Faced Metal Trim x 90-degree angle
d. Model: Tape on Trim No. B2
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 15

4. Offset Inside corner:
a. Mfgr: USG
b. Product: Sheetrock Brand
c. Material: Paper Faced Metal Trim x greater than 90 degree angle d. Model: B2 OS

5. “Z” shape trim for edge of board at step back reveal:
a. Mfgr: USG
b. Product: Sheetrock Brand
c. Material: Paper Faced Metal Trim Tape on trim x “Z” profile d. Model: B4 NB

6. “L” shape trim for edge of board at Acoustical tile ceiling:
a. Mfgr: USG
b. Product: Sheetrock Brand
c. Material: Galvanized Metal Trim x “L” shape 90-degree angle d. Model: No. 200 – B x ½” and/or ⅝”

7. “J” shape trim for edge of board, typical:
a. Mfgr: USG
b. Product: Sheetrock Brand
c. Material: Galvanized Metal Trim
d. Model: No. 200 – A x ½” and/or ⅝”

8. Control Joint:
a. Mfgr: USG
b. Product: Sheetrock Brand
c. Material: Zinc
d. Model: No. 093
e. Profile: ¼” opening x 7/16” depth x 10’-0” length

9. Drywall “L” trim:
a. Mfgr: Flannery,
b. Product: Drywall “L”
c. Model: DWL
d. Material: Mil Finish Aluminum
e. Size:
1) Width: ¼” thru 4-3/’4”
a) Size to fit field condition
2) Length: 10’-0”
3) Tape flange: 7/8” wide
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 16
B. Substrate Fasteners

1. Nails: (Wood framing)
a. Size (1-1/2”) (1-3/4”)
1) 11-gauge, hot-dipped galvanized roofing nails with nominal 7/16” diameter head for wood framing.

2. Screws: (Metal stud framing)
a. 1” Type S-12 Bugle Head Corrosion-Resistant Screws for application of sheathing to steel studs.
b. 1-1/4” Type S-12 Pancake Head Corrosion-Resistant Screws for application of self-furring metal lath or brick ties through sheathing to steel studs.

C. Joint Treatment and Skim Coat Treatment - Interior

1. Schedule:
a. Applications:
1) Typical, interior dry conditions, U.N.O
a) Type:
i. Drying: water evaporation type unless application is; a. In cold weather
a. Required to be Setting Compound by type of tape such as mesh fiberglass b. Required by application
c. Required by sheathing mfgr.
b) Mfgr: USG
c) Brand: Sheetrock
d) Tape Product: Joint Tape – Heavy
e) Treatment Compound:
i. Product:
a. Initial installation of tape:
i). Product: Taping Compound
b. Secondary and final finishing compound:
i). Product: Toping Compound or Plus Three Compound
c. Skim Coat:
i). Product: Plus Three Compound
2) Interior Face of All Exterior Walls:
a) Substrate: DensArmor Plus
i. Mfgr: Georgia Pacific
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 17
b) Tape Product: Self adhering 10x10 x 2” wide woven glass mesh tape over all joints, inside corners and outside corners
i. Mfgr: Georgia Pacific
ii. Model: ToughRock, Fiberglass mesh tape
c) Treatment Compound:
i. Mfgr: USG
ii. Type: Setting Compound (chemical hardening)
iii. Product:
iv. Installation: Per manufacturers recommendations
v. Finish: Level 5
a. Includes as herein specified with the entire surface of sheathing skim coated. 3) Wet conditions - Interior: Tile veneer finish
a) Substrate: DensShield Tile Backer Board
i. Mfgr: Georgia Pacific
b) Tape Product: Self adhering 10x10 x 2” wide woven glass mesh tape over all joints, inside corners and outside corners
i. Mfgr: Georgia Pacific
ii. Model: ToughRock, Fiberglass mesh tape
c) Treatment Compound:
i. Mfgr: USG
ii. Type: Setting Compound (chemical hardening)
iii. Product:
iv. Installation: Per manufacturers recommendations
4) Wet conditions - Interior: Non tile veneer finish
a) Substrate: DensShield Tile Guard
i. Mfgr: Georgia Pacific
b) Tape Product: Self adhering 10x10 x 2” wide woven glass mesh tape over all joints, inside corners and outside corners
i. Mfgr: Georgia Pacific
ii. Model: ToughRock, Fiberglass mesh tape
c) Treatment Compound:
i. Mfgr: USG
ii. Type: Setting Compound (chemical hardening)
iii. Product:
iv. Installation: Per manufacturers recommendations
v. Finish: Darby float Skim coat for level 5 finish and paint 5) Damp conditions – Interior: Non-shower areas
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 18
a) Substrate: Aqua Tough
i. Mfgr: USG
b) Tape Product: Self adhering 10x10 x 2” wide woven glass mesh tape over all joints, inside corners and outside corners
i. Mfgr: Georgia Pacific
ii. Model: ToughRock, Fiberglass mesh tape
c) Treatment Compound:
i. Mfgr: USG
ii. Type: Setting Compound (chemical hardening)
iii. Product:
iv. Installation: Per manufacturers recommendations
v. Finish: Darby float Skim coat for level 5 finish and paint D. Wall finish, Texture Products and Schedule - Interior

1. General: Comply with USG Design Guidelines SA923

2. Finish Schedule:
a. Finish Texture:
1) Standard Texture:
a) Mfgr: USG
b) Texture designation:
i. Textured walls: Fine Orange Peel
ii. Smooth Wall Level Five: No texture
c) Schedule: At all walls and ceilings, U.N.O
d) Product Schedule:
i. Sealer / Primer:
a. Material: Gypsum board sealer/primer
b. Product: First Coat, Sheetrock brand
c. Application: Spray applied over entire surface Material ii. Texture:
a. Material: Red Bag Wall Texture
b. Application: Spray applied
c. Coverage: Apply at rate of 20-40 pounds per square foot 2) Smooth Wall / Level 5 – Skim Coat
a) Mfgr: USG
b) Texture Designation: Smooth Wall, Level 5 - Darby
c) Schedule:
i. Locations indicated on Drawings, including , as herein listed:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 19
a. Showers without tile veneer
b. Public spaces – walls and ceilings
ii. As herein specified
a. Public spaces – walls and ceilings
i). Lobbies
ii). Corridors
iii). All conditions
d) Product Schedule:
i. Skim Coat – Smooth Wall Level 5
a. Material: Plus Three
b. Application: Steel Trowel applied over entire surface of board. ii. Sealer /Primer Coat: Level 4 and 5 finish
a. Material: Gypsum board sealer/primer
b. Product: First Coat, Sheetrock brand
c. Application: Spray applied over entire surface
d. Note: This is in addition to painters primer to be installed per Section 09 90 00 – Painting and Coatings.

PART 3 - EXECUTION

3.1 INSPECTION/EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

3.4 MOCK-UP
A. Erect at location approved by Architect.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 20

1. Mock-up shall be part of final construction once approved by Architect.

2. Mock-up shall comprise of all components and finishes as specified and indicated in Drawings. a. Texture
b. Level 5 finish
B. Mock-up

1. Size: 6’ x 6’

2. Qty: One (1) each for each wall surface condition and finish

3.5 INSTALLATION
A. General:

1. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

2. Perform work in accordance with herein listed standards.

3. Install with fiberglass tape at gypsum board requiring it as herein specified and required by mfgr.

B. Sheet arrangement layout: Conform to layouts and requirements indicated; use long sheets to restrict joints to minimum.

1. Edges of sheathing shall not align with the vertical and/or horizontal edges of window and/or door openings.

C. Interior Joints:

1. Perform work in accordance with gypsum board mfgr’s requirements and to meet smooth wall and/or textured wall surface

2. Perform work in accordance with gypsum board mfgr’s requirements and in accordance with wall veneer including, but not limited to;
a. Tile
D. Typical:

1. Fasteners:
a. Place fasteners 3/8 inch from edges of boards, except when using washers or clips with fasteners in joint.
b. Install fasteners with heads dimpled slightly below surface; do not cut through skin. c. Space fasteners in accordance with ASTM C840 and manufacturer's recommendations, except as otherwise required by CBC.
d. Install type of fastener and length in accordance with sheathing manufacturer. e. All ends and edges of all gypsum wallboard shall occur over framing members, except when joints are at right angles to framing members.

2. Ceilings:
a. General:

1. Place boards with long dimension at right angles to supports and end joints occurring over supports.

2. Place perimeters of ceilings and edges of openings over solid bearing members.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 21
b. Maximum joist spacing shall not exceed 12” O.C.

3. Partitions: Place boards with long dimension either vertical or horizontal (but not combination of both) on studs. Stagger joints on opposite sides of partitions. Locate joints at least 12 inches from jambs of openings. Keep end joints to minimum. Fasten double layer gypsum board as required by code, stagger joints in second layer.

4. Caulking: Using double bead of specified material, install at floors, wall intersections, where walls abut other materials and at all electrical boxes. Install wherever caulking materials is indicated in connection with gypsum board. Apply in accordance with manufacturer's printed directions.

5. Cutting and scribing: Cut neatly to fit around outlets, switch boxes and other protrusions, using keyhole saw or specially designed cutting tool for opening of exact shape and size needed.

6. Trim: Edge exterior corners with bead set to true, plumb line. Where gypsum board joins or abuts any material other than gypsum board, cover end of board with metal casing, leaving joint sufficient for installation of caulking (refer to Article 3.03 F above).

E. Finishing

1. Matrix: Joint treatment and Skim coat treatment:
a. USG matrix of materials and level of finish
1) For other products indicated, match that manufacturer’s installation recommendations.

Ready-Mixed Joint Compounds Drying-Type Joint Compounds Setting-Type Joint Compounds
First
Coat
Taping Topping AllPurposePlus 3 Taping Toppin
g
AllPurposeAP
Lite
Durabond

Easy
Sand
Level 0
Not Used
Level 1
Embedding        
Level 2
Embedding        
Fill        
Level 3
Embedding        
Fill        
Primer 
Level 4
Embedding        
Fill        
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 22
Finish        
Primer 
Level 5
Embedding        
Fill        
Finish        
Skim/Darby  
Primer 

2. Levels Schedule
a. Levels of Finish. The following levels of finish are established as a guide for specific final decoration and/or Smooth Wall finish and are a minimum standard for each condition. 1) Level 0:
a) Not Used
2) Level 1:
a) Schedule:
i. Plenum areas above ceilings, in attics, in areas where the assembly including, but not limited to;
a. Joints
b. Fastener heads
c. Around all wall penetrations
ii. All joints, exterior angles, reveals and interior angles shall have tape embedded in joint compound.
a. Surface shall be free of excess joint compound.
b. Tool marks and ridges are acceptable.
3) Level 2:
a) Schedule:
i. Use where water resistant tile backing board is used as a substrate for tile. ii. All joints, fasteners, exterior angles, reveals and interior angles shall have fiberglass mesh tape embedded in joint compound and one additional separate coat of joint compound applied over all joints, angles, fastener heads, and accessories. Surface shall be free of excess joint compound. Tool marks and ridges are acceptable.
iii. Primer/Sealer: yes, entire gypsum board surface including treated joints, exterior angles, interior angles, reveals, fasteners, etc. shall be coated with a primer/sealer prior to the application of final finishes.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 23
iv. Gypsum board primer/sealer must be applied as a requirement of this specification section in addition to any and all requirements of primer and paint specified and installed under Section 09 90 00 – Painting and Coatings. 4) Level 3:
a) Schedule:
i. Use at conditions where a material will be adhesively applied to gypsum board. a. Not for use at tile applications.
ii. Texture: None
iii. Applications:
a. Where indicated in drawings
b. FRP panel substrate
b) Application:
i. All joints and angles shall have tape embedded in joint compound and wiped with a joint knife leaving a thin coating of joint compound over all joints and angles.
a. Joint compound applied over the body of the tape at the time of tape embedment shall be considered a separate coat of joint compound and shall satisfy the conditions of this level.
ii. All fasteners heads and accessories shall be covered with a coat of joint compound and wiped with a joint knife leaving a thin coating of joint compound. iii. Surface shall be free of excess compound.
iv. Tool marks and ridges are acceptable.
v. Primer/Sealer: yes, entire gypsum board surface including treated joints, exterior angles, interior angles, reveals, fasteners, etc. shall be coated with a primer/sealer prior to the application of final finishes. a. Gypsum board primer/sealer must be applied as a requirement of this specification section in addition to any and all requirements of primer and paint specified and installed under Section 09 90 00 – Painting and coatings. 5) Level 4:
a) Schedule:
i. Use at all conditions unless noted and/or specified to be Smooth Wall, Level 5 as specified herein, refer to “Level 5 (Smooth Wall) heading and Drawings. ii. Texture; refer to Heading 2.05 for required texture. b) Application:
i. All joints, fasteners, exterior angles, reveals and interior angles shall have tape embedded in joint compound and three separate coats of joint compound applied over all joints, fasteners, angles, fastener heads, and accessories. All joint compounds shall be smooth and free of tool marks and ridges. Refer to Heading

2.04 for schedule of specific products.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 24
a. Taping Compound width schedule:
i). First coat: 8” wide
ii). Second coat: 10” wide
iii). Third coat: 12” wide
b. Primer/Sealer: yes, entire gypsum board surface including treated joints, exterior angles, interior angles, reveals, fasteners, etc. shall be coated with a primer/sealer prior to the application of final finishes. i). Gypsum board primer/sealer must be applied as a requirement of this specification section in addition to any and all requirements of primer and paint specified and installed under Section 09 90 00 – Painting and Coatings.
c) Limitations:
i. At un-backed vinyl wall covering apply a Level 5 finish to wall substrate 6) Level 5: (Smooth Wall / Skim Coat)
a) Schedule:
i. Use this level of finish at:
a. All locations herein listed (walls, ceilings and soffits) b. All locations with G.P. DensArmor Plus sheathing
c. All locations herein listed as indicated in drawings, including but not limited to;
i). Shower Ceilings without tile veneer
ii). Conference rooms
iii). Lobbies
iv). Corridors.
v). Other locations indicated on Drawings
vii). Locations herein specified
d. All High gloss painted surfaces
b) Application:
i. All joints, fasteners, exterior angles, reveals and interior angles shall be embedded in joint compound and three separate coats of specified compound applied over these conditions and one final “Skim Coat” of specified compound trowel applied over entire surface of gypsum board.
a. Taping Compound width schedule:
i). First coat: 8” wide
ii). Second coat: 10” wide
iii). Third coat: 12” wide
iv). Fourth: 12” wide to both sides of “Third coat”
v). Skim coat: Entire surface of board.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 25
b. The thin “Skim Coat” of specified compound shall be applied to the entire gypsum board surface after the three separate applications of tapping compound have been installed at all joints, fasteners, exterior angles, reveals and interior angles.
i). Sand only taped joints prior to application of thin skim coat. ii). Skim coat shall be applied prior to any sanding of non-taped board surface
c. Skim coat must be applied with a “Darby” steel trowel or knife blade. i). Install mud to thickness as required to fill imperfections in surface using “Darby” method to fill surface up to ¼” in thickness.
ii). Use a minimum 4’-0” wide blade.
d. The surface shall be smooth and free of tool marks and ridges. ii. Primer/Sealer: yes, entire gypsum board surface including treated joints, exterior angles, interior angles, reveals, fasteners, etc. shall be coated with a primer/sealer prior to the application of final finishes. a. Gypsum board primer/sealer must be applied as a requirement of this specification section in addition to any and all requirements of primer and paint specified and installed under Section 09 90 00 – Painting and Coatings.

3.6 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
GYPSUM BOARD AND SHEATHING SUBSTRATES 09 29 00 - 26
I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END SECTION 09 29 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 1
SECTION 09 30 00 – TILE AND STONE
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Interior floor and wall applications with the following requirements as herein specified and as indicated on Documents, including but not limited to:
a. Liquid applied Waterproof and Crack protection floor and base assembly b. Shower room waterproof floor, base, wall and ceiling assembly

2. Grouts

3. Tile and Grout Sealers

4. Adhesives and Sealants

5. Transitions and Accessories

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Iron and Steel Institute (AISI) www.steel.org

1. Specification for the Design of Cold Formed Steel Structural Members E. American Society for Testing and Materials (ASTM) www.astm.org

1. ASTM A82 Standard Specification for Steel Wire, Plain, for Concrete Reinforcement

2. ASTM A185 Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement

3. ASTM C144 Standard Specification for Aggregate for Masonry Mortar

4. ASTM C150 Standard Specification for Portland Cement City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 2

5. ASTM C157 Standard Test Method for Length Change of Hardened Cement Mortar and
Concrete

6. ASTM C270 Standard Specification for Mortar for Unit Masonry

7. ASTM C482 Standard Test Method for Bond Strength of Ceramic Tile to Portland Cement Paste

8. ASTM C627 Standard Test Method for Evaluating Ceramic Floor Tile Installation Systems Using the Robinson-Type Floor Tester

9. ASTM C794 Standard Test Method for Adhesion-in-Peel of Elastomeric Joint Sealants

10. ASTM C847 Standard Specification for Metal Lath

11. ASTM C920 Standard Specification for Elastomeric Joint Sealants

12. ASTM C1028 Evaluating the Static Coefficient of Friction of Ceramic Time and Other Like Surfaces by the Horizontal Dynamometer Pull Method.

13. ASTM D751 Standard Test Method for Coated Fabrics

14. ASTM D4068 Standard Specification for Chlorinated Polyethylene (CPE) Sheeting for Concealed Water-Containment Membrane

15. ASTM D4263 Standard Test Method for Determining Moisture in Concrete by the Plastic Sheet Method

16. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

17. ASTM E96 Standard Test Methods for Water Vapor Transmission of Materials F. American Society of Mechanical Engineers (ASME) www.asme.org

1. ASME A112.6.3 Floor and Trench Drains
G. American National Standards Institute (ANSI) www.ansi.org

1. ANSI A108/A118/A136.1 American National Specifications for the Installation of Ceramic Tile
H. Tile Council of North America (TCNA), www.tcnatile.com

1. Handbook for Ceramic, Glass and Stone Tile Installation I. Materials and Methods Standards Association (MMSA), www.mmsa.usa

1. MMSA Bulletins 1 – 16
J. International Organization for Standardization (ISO), www.iso.org

1. ISO 13007 Ceramic Tiles Grouts and Adhesives

2. ISO/TS 11665 Measurement of Radioactivity within the Environment (Radon)

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Job site inspections shall be done as herein specified and as listed in drawings.

3. Testing shall be done as herein specified and as listed in drawings.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 3
B. Standards:

1. General:

Item Name of Test Performance Testing Std.

Subsurface level 1/8” in 10’-0” non-cumulative
tolerance, typical 1/16” in 1’-0” non-cumulative
Subsurface level
tolerance between
adjoining edges of
same or dissimilar
materials
1/32” max
ANSI
standards
Subsurface
Moisture level Dry ASTM D4263
and Section
07260
Slip Resistance
Coefficient of Friction
Flooring 0.6 min level to 5%
Installation
Slip Resistance
Coefficient of Friction

0.8 min greater than 5%
ASTM C 1028
Movement
Joints
Locations Interior: not to exceed 24’-0” to 36’-0” in
each direction over floor.

TCNA EJ171-
07 Floor and
Wall
Finishes
Interior Surface Finishes Materials shall be smooth, hard, nonabsorptive material within boundaries indicated in building code and as
revised to be more inclusive as indicated
in contract documents.

CBC 1210.2
Wall to floor
transition
Type 3/8” min. radius cover of smooth, hard,
non-absorptive material.

Health dept.
having
jurisdiction
Refer to drawings and as herein specified

2. Wall and Ceiling Sheathing
a. Refer to Section 09 29 00 - Gypsum Board & Sheathing Substrates.

C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

D. Construction Testing:

Item Name of Test Performance Results Testing Std.

Sealers Appearance of
substrate not
altered
Mockup on samples of tile
shall be provided with
submittal for visual approval
by Architect prior to
installation of tile.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 4
Shower Pan, Sauna and
Steam room floor
Assemblies
Flood Test No leaks visible after 36
hours
CPC, Section 411.8.1
Laticrete TDS 169 Flood
Testing Procedures

1.4 SUBMITTALS AND MOCK-UPS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements.

D. Submit product information, samples, and shop drawings in one complete submittal package:

1. Manufacturer Product & Technical Data for all assembly components.

2. Manufacturer MSDS Sheets

3. Manufacturer Installation Instructions

4. Manufacturer and Contractor Warranties

5. Manufacturer Certifications

6. Product Samples:
a. Provide three (3) of each type, color, size, and finish included in the work, noted with designation herein, and noted in the drawings, including:
1) Full size tile and trim shapes (without sealer)
a) Where tile has color or pattern variation, provide samples which represent the full potential range of variation.
2) Grout color samples
3) Sealant color samples
4) Prefabricated joints / transitions
b. Provide one (1) additional tile sample of each type, color, size, and finish included in the work, noted with designation herein, and noted in the drawings with sealer applied to the tile sample.

7. Shop drawings:
a. Submit drawings (plans, elevations) showing location for each type of tile and clearly indicating pattern, color, expansion joints, soft joints (sealant), and tile start points. 1) Contractor shall use as a guide the TCNA Manual, drawings and specifications, most current editions for expansion and sealant joint locations.

8. Mock-Ups:
a. Erect at locations approved by Architect.
1) Size: 4’-0” x 4’-0” minimum or as required to show color, texture, and pattern variations. 2) Mock-up shall be part of final construction once approved by Architect and Owner.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 5
b. Mock-up shall comprise of all components and finishes as specified and indicated in Drawings.
1) Install a fully finished mock-up for each tile type and installation type for review and approval, including all components for the complete assembly, including but not limited to:
a) Floor tile
b) Base tile or transition
c) Wall tile
d) Outside corners
e) Inside corners
f) Trim pieces including at top edge of wall tile
g) Grout
h) Sealant
i) Sealer on grout mock-up shall be done in field in a non-conspicuous location for review by Architect.
j) Tile sealer mock-up shall be provided on tile as part of samples submittal. c. Tile and grout mock-up will be reviewed for layout, color range, pattern, lippage, joint quality and consistency, and workmanship.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer shall have been in business for five (5) years providing/finishing similar size projects and complexity.

C. Installation System Manufacturer specializing in adhesive, mortar, grout and other tile assembly installation materials shall have minimum ten (10) years’ experience and ISO 9001 certification.

1. Obtain installation materials from single source manufacturer to ensure consistent quality, full compatibility, and compliance with specified warranty requirements.

D. Lead Times:

1. Bidders and General Contractor shall coordinate with supplier to verify product lead times during bid and at award of contract, and account for such lead times in their costs and schedules.
a. Bidders shall certify in writing that all materials have acceptable lead times as they relate to availability for sub-contractor and General Contractor to meet construction schedule and sequence of construction.
1) Bidders shall provide an itemized list of materials which might have or are confirmed to have a lead time problem and what the anticipated lead time is. 2) Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 6

2. General Contractor and Subcontractor shall be responsible for preparing submittals and obtaining Architects review and acceptance of submittal, and for ordering materials in time to meet the construction schedule.
a. Additional time required of Architect to reselect materials or review alternate proposed materials due to the failure of the General Contractor and Subcontractor to accommodate sufficient time for these activities, including the potential for submittal revision and resubmittals, may be back charged to the General Contractor by the Owner.

E. Stipulations

1. Installation materials including adhesive, thin set, grout and sealant shall be used from a single manufacturer in order to provide specified extended system warranty.

2. All finish floor surface material shall meet or exceed the minimum “ADA” Minimum Coefficient of Friction.

3. Tile contractor, by commencing the work of this section, assumes overall responsibility to assure that all assemblies, components and parts shown or required within the work of this section comply with contract documents and are compatible with each other and with the conditions and expected use.

4. Floors to receive tile finish shall not be leveled with gypsum- or asphalt-based compounds.

F. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work.

1. Agenda for meeting shall include, but not be limited to:
a. Substrate preparation
b. Substrate vapor emission & alkalinity testing and compliance c. Adhesion testing
d. Flooring transitions
e. Crack and waterproofing application to substrates
f. Wall penetrations
g. Caulking and sealing
h. Joints – expansion and control
i. Grout types
j. Mock up

2. General Contractor shall request meeting at least three weeks prior to commencing work.

G. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures.

1. Manufacturer’s representative shall review and certify in writing all phases of construction to verify the complete work meets specification requirements.

2. Written certification of all phases of construction shall be sent to the Architect by the manufacturer’s representative.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 7
H. Installation of tile shall be done under finished (not temporary) lighting conditions to ensure tile is properly spaced, flush, and true.

I. Comply with ANSI Standard for Tile Installation Material and current Tile Council of America Handbook for products and materials indicated for setting and grouting.

J. Refer to drawings and to these specifications for criteria related to control joints at walls and floors.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. Deliver materials to building site in manufacturer's labeled, unbroken containers.

C. Store tile and installation system materials in a dry location; handle in a manner to prevent chipping, breakage, and contamination.

D. Protect latex additives, organic adhesives, epoxy adhesives and sealants from freezing or overheating in accordance with manufacturer’s instructions; store at room temperature when possible.

1.7 JOB CONDITIONS
A. Field-verify that all components, backing, etc. by others are installed correctly to proceed with installation of products as herein specified.

B. Comply with requirements of referenced standards and recommendations of material manufacturers for environmental conditions before, during and after installation.

C. Maintain environmental conditions and protect work during and after installation to comply with referenced standards and manufacturer’s printed recommendations.

D. Maintain minimum and maximum temperature limits as recommended by manufacturers.

E. Illuminate the work area during installation providing the same level and angle of illumination as will be available for final inspection.

F. Do not apply materials on wet or damp surfaces.

G. Defer laying tile until other work that might cause damage to flooring has been completed.

H. Concrete surfaces shall be:

1. Cured a minimum of 28 days at 70° F, including an initial seven (7) day period of wet curing.

2. Wood float finished, or better, if the installation is to be done by the think bed method.

3. All curing compounds or topical vapor emissions treatments shall be removed and/or concrete floor scarified for proper adhesion of adhesives, mortars, membranes, etc.

I. Advise General Contractor of any surface or substrate conditions requiring correction before tile work commences.

1. Beginning of work constitutes acceptance of substrate or surface conditions.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 8
J. Maintain ambient temperature not less than 50°F or more than 100°F during installation and for a minimum of seven (7) days after completion.

1. There should be no ice in/on slab.
a. Freezing after installation will not damage latex Portland cement mortars.

2. Protect Portland Cement based mortars and grouts from direct sunlight, radiant heat, forced ventilation (heat & cold) and drafts until cured to prevent premature evaporation of moisture.

3. Epoxy mortars and grouts require surface temperatures between 60°F and 90°f at time of installation.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish additional 25-year System Warranty which is in addition to initial manufacturer and Contractor product and installation warranty.

1. Warranty shall cover the replacement of Finish tile material, all installed materials, sealants, adhesives, mortar bed, grout, etc. for a period as herein listed:
a. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner by product manufacturer.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Concrete slab substrate

2. Concrete deck substrate

3. Wood deck substrate

4. Wall and ceiling framing

5. Wall sheathing and substrates

6. Wall, floor & ceiling penetrations

7. Plumbing

8. Electrical
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 9
B. Related Sections include, but are not limited to:

1. Division 1

2. Section 03 30 00 – Cast-in-Place Concrete

3. Section 05 40 00 – Cold-Formed Metal Framing

4. Section 06 10 00 – Rough Carpentry

5. Section 07 26 00 – Concrete Slab Vapor Emission Control Treatment

6. Section 07 92 00 – Sealants and Caulking

7. Section 09 22 16 – Non-Structural Metal Framing

8. Section 09 29 00 – Gypsum Board & Sheathing Substrates

9. Section 10 28 00 – Toilet Accessories

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

C. Proceed with tile work only after curbs, vents, drains, piping, and other projections through substrate have been installed and when substrate construction and framing of openings have been completed.

D. General Contractor shall coordinate slab vapor emission and PH testing of concrete floor treatments, or removal thereof, prior to the installation of finish flooring as herein specified.

Coordinate with Section 07 28 00 Concrete Slab Vapor Emission and Alkalinity Control Treatment.

1.13 EXTRA MATERIAL
A. Submit as part of project closeout:

1. Provide extra material for each product type, color, finish, etc. in same lot as installed product. a. Furnish written certification that extra materials supplied have been inspected and confirmed to be the same as those used in the Work.

2. Provide extra material in unopened fully labeled containers a. Do not supply anything less the full cartons / containers. b. Furnish in factory packaged and labeled cartons and identify cartons with Project name, location(s) within building (room names/numbers).
c. Deliver extra materials to location directed by the Owner just prior to substantial completion.

3. Provide the following:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 10
a. 10% minimum of installed quantity of each full-size floor, wall, or coved base tile for each product, color, texture, etc. installed.
1) Provide material in sealed boxes and clearly labeled with:
a) Tile designation per drawings
b) Material manufacturer, product, color, finish, and texture b. 10% minimum of each grout used labeled with:
1) Grout designation per drawings
2) Grout manufacturer, product type, product name, and color c. 2 gallons of each cleaner and sealer used labeled with:
1) Sealer manufacturer and product names
d. 2 tubes of each sealant color labeled with:
1) Sealant manufacturer, product name, and color names

1.14 GENERAL SYSTEM DESCRIPTION
A. Tile and stone installation integral with membranes, adhesives, grouts, sealants, etc.

B. Installation of products from single manufacturer as required to meet extended system warranty specified herein.

1. Use of products from multiple manufacturers is not acceptable.

C. Tile Assemblies, typical U.N.O.:

1. TCNA F122 - Thin Set Tile Floor Assembly
a. Tile and Grout o/
b. Latex Portland Cement Mortar Bond Coat o/
c. (Bonded) Waterproofing / Anti-Fracture Membrane o/
d. Concrete or cured mortar bed

2. TCNA W245 – Thin-set Tile Interior Wall Assembly
a. Tile and Grout o/
b. Latex Portland Cement Mortar Bond Coat o/
c. Coated Glass Mat Water Resistant Gypsum Backer Board (per Section 09 29 00) o/ d. Wood or Metal Studs
D. Shower Tile Assembly

1. TCNA F121 – Cement Mortar Bed Tile Floor Assembly, typical @ showers in conjunction with TCNA B420 Shower Receptor [requires a depressed slab]
a. Tile and Grout o/
b. Latex Portland Cement Mortar Bond Coat o/
c. Reinforced Mortar Bed (1-1/4” min. to 2” max.) o/
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 11
d. Shower Pan o/
e. Sloped Concrete slab on grade or Sloped Concrete fill

2. TCNA W245 – Thin-set Tile Interior Wall Assembly
a. Tile and Grout o/
b. Latex Portland Cement Mortar Bond Coat o/
c. Bonded Waterproof Membrane o/
d. Coated Glass Mat Water Resistant Gypsum Backer Board (per Section 09 29 00) with Flexible Sealant joint between b.o. Backer Board and Mortar Bed o/ e. Wood or Metal Studs
PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single-source responsibility specified items shall be from one manufacturer for each product type.

B. Acceptable manufacturers and installers shall be one of the following, and as listed herein and in Drawings:

1. Tile:
a. Refer to Drawings for specifications and manufacturer name(s).

2. Tile installation assembly products (all products from one manufacturer as required to meet specified warranties):
a. Laticrete, www.laticrete.com
b. MerKrete, www.merkrete.com
c. Custom Building Products, www.custombuildingproducts.com

3. Transition Trims
a. Schluter www.schluter.com
b. Blanke Corp., www.blankecorp.com

4. Sealers and Cleaners:
a. Laticrete, www.laticrete.com
b. MerKrete, www.merkrete.com
c. Custom Building Products, www.custombuildingproducts.com d. Miracle Sealants, www.rustoleum.com/pages/miracle-sealants

5. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 12
C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. Wall and Ceiling Sheathing

1. Refer to Section 09 29 00 – Gypsum Board and Sheathing Substrates B. Grout:

1. Application: Typical, U.N.O.
a. Mfgr: Laticrete
b. Product: PermaColor
c. Material: High performance, fast setting polymer fortified grout featuring built-in Microban Anti-Microbial Protection
d. Standards:
1) ANSI A118.6
2) ANSI A118.7
3) EN 13888
4) ISO 13007
e. Properties:
1) Tensile Strength: 510 psi (3.5 MPa)
2) Compressive Strength: 4750 psi (32.8 MPa)
3) Flexural Strength: 1400 psi (9,65 MPa)
4) Linear Shrinkage: 0.065%
5) Water Absorption: 3.25%
f. Testing:

Test Test Method ISO 13007-3 CG2WA
Specification
Results
28 Day Cure Abrasion Resistance ISO 13007-4 4.4 Less than or equal to 1,000 mm3 (0.061 in3 )
121–132 mm3
(0.0074– 0.0081 in3 )
28 Day Cure Flexural Strength ISO 13007-4 4.1.3 Greater than 2.5 MPa (362 psi)

8.5–9.2 MPa (1226–
1340 psi)
6 Day 21 Day Water Soak 25
Freeze/Thaw Cycle Flexural Strength
ISO 13007-4 4.1.3 Greater than 2.5 MPa
(362 psi)

3.31–3.79 MPa (480–
550 psi)
28 Day Cure Compressive Strength ISO 13007-4 4.1.4 Greater than 15 MPa (2175 psi)

35.7–36.8 MPa
(5,176– 5,339 psi)
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 13
6 Day 21 Day Water Soak 25
Freeze/Thaw Cycle Compressive
Strength
ISO 13007-4 4.1.4 Greater than 15 MPa
(2175 psi)

30.4–31.2 MPa
(4,408– 4,518 psi)
28 Day Cure Shrinkage ISO 13007-4 4.3 Less than 3 mm/m (0.12 in./3.28 ft)

0.51–0.62 mm/m
(0.02–0.024 in/3.28 ft)
28 Day Water Absorption Soaked 30
Minutes
ISO 13007-4 4.2 Less than 2 g (0.0044
lb)

0.09–0.14 g (0.0002–

0.0003 lb)
28 Day Water Absorption Soaked 240
Minute
ISO 13007-4 4.2 Less than 5 g (0.011 lb) 0.54–0.7 g (0.0012–

0.0015 lb)
C. Latex Portland Cement Mortar Bond Coat, Mortar Bond Coat and/or Bond Coat:

1. Mfgr: Laticrete

2. Product: 254 Platinum

3. Material: One-step, polymer fortified, thin-set mortar

4. Standards:
a. ANSI A118.4
b. ANSI A118.11
c. ANSI A118.15
d. EN 12004
e. ISO 13007-1

5. Properties:

Test Test Method Results Specification
28 day Cure Porcelain Tile Shear Strength ANSI A118.15

7.2.5 475-575 psi
(3.3-4.0 MPa)
>400 psi (2.76 MPa)
Shear Bond Porcelain Tile Water Immersion ANSI A118.15

7.2.4 250-300 psi (1.7-

2.4 MPa)
>200 psi (1.38 MPa)
28 day Heat Aging Tile Shear Strength ANSI A118.15

7.2.7 600-700 psi (4.1-

4.8 MPa)
>400 psi (2.76 MPa)
28 day Cure Quarry Tile to Plywood Shear Bond ANSI A118.11

4.1.2 250-300 psi (1.7-

2.1 MPa)
>150 psi (1.0 MPa)
28 Day Cure Tensile Adhesive Strength ISO 13007-2

4.4.2 1 MPa (145 psi) 1.8 – 2.6 MPa (261-
377 psi)
7 Day Cure
21 Day Water Immersion Tensile Adhesive
Strength
ISO 13007-2

4.4.3 1 MPa (145 psi) 1.3-1.5 MPa (174-
221 psi)
14 Day Cure
14 Day Heat Age Tensile Adhesive Strength
ISO 13007-2

4.4.4 1 MPa (145 psi) 2.4-3.0 MPa (345-
438 psi)
7 Day Cure
21 Day Water Immersion 25 Freeze/Thaw Cycle
Tensile Adhesive Strength
ISO 13007-2

4.4.5 1 MPa 145 psi) 2-1.7 MPa (171-
247 psi)
Open Time After 30 Minutes ISO 13007-2

4.1 0.5 MPa (73 psi) 1.3-1.9 MPa (190-
283 psi)
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 14
Slip ISO 13007-2

4.2 Less than or
equal to 0.5 mm
(0.02 inches)

0.5 mm (0.02
inches)
Transverse Deformation ISO 13007-2

4.5 Greater than or
equal to 2.5 mm
(0.1 in.) and less
than 5 mm (0.2
in.)

3.2-3.6 mm (0.13-

0.14 in.)
D. Bonded Membrane and/or Bonded Anti-Fracture Waterproofing Membrane:

1. Application: Typical, U.N.O.
a. Mfgr: Laticrete
b. Product: HydroBan
c. Properties:

Physical Property Test Method Results
7-day Hydrostatic Tes ANSI A118.10 Pass
7-day Breaking Strength ANSI A118.10 265–300 psi (1.8– 2.1 MPa) 7-day Water Immersion ANSI A118.10 95–120 psi (0.7–0.8 MPa) 7-day Shear Bond ANSI A118.10 200–275 psi (1.4– 1.9 MPa) 28-day Shear Strength ANSI A118.10 214–343 psi (1.5– 2.3 MPa) System Crack Resistance Test ANSI A118.12.5.4 Pass (High) Water Vapor Transmission ASTM E 96– 00E1 Procedure B 0.515 grains/h • ft2 (0.3602 g/h • m2 ) Water Vapor Permeance ASTM E 96– 00E1 Procedure B 1.247 perms 71.21 (ng/Pa • s • m2 ) System Performance ANSI A118.10; ASTM C627; TCA
Rating
cycles 1–14 "Extra Heavy"
Potability of Water Applicable to
Waterproofing Systems
NBR 12170:2009 (Technical
Norm from Brazil)
Pass
Tensile Strength for Elongation 250%
Thickness (Dried) 20–30 mils (0.5–0.8 mm)

2. Application: Showers
a. Mfgr: Laticrete
b. Product: HydroBan
c. Properties:

Physical Property Test Method Results
7-day Hydrostatic Test ANSI A118.10 Pass
7-day Breaking Strength ANSI A118.10 265–300 psi (1.8– 2.1 MPa) 7-day Water Immersion ANSI A118.10 95–120 psi (0.7–0.8 MPa) 7-day Shear Bond ANSI A118.10 200–275 psi (1.4– 1.9 MPa) 28-day Shear Strength ANSI A118.10 214–343 psi (1.5– 2.3 MPa) System Crack Resistance Test ANSI A118.12.5.4 Pass (High) Water Vapor Transmission ASTM E 96– 00E1 Procedure B 0.515 grains/h • ft2 (0.3602 g/h • m2 ) City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 15
Water Vapor Permeance ASTM E 96– 00E1 Procedure B 1.247 perms 71.21 (ng/Pa • s • m2 ) System Performance ANSI A118.10; ASTM C627; TCA
Rating
cycles 1–14 "Extra Heavy”
Potability of Water Applicable to
Waterproofing Systems
NBR 12170:2009 (Technical
Norm from Brazil)
Pass
Tensile Strength for Elongation 250%
Thickness (Dried) 20–30 mils (0.5–0.8 mm)
E. Shower Pan:

1. Application: Typical Shower Pan, u.o.n.
a. Mfgr: Laticrete
b. Product: HydroBan Sheet Membrane
c. Material: Single component, self-curing liquid rubber polymer that forms a flexible, seamless waterproofing / crack isolation membrane that does not require the use of a fabric in the field.
d. Standards:
1) ANSI 118.10
2) ANSI A118.12
3) IAPMO PS106 approved
e. Properties:

Physical Property Test Method Results
Seam Strength ASTM D751 32.7 lbs/in. (0.6kg/mm)
Breaking Strength
Transverse
ASTM D751
Procedure B
1298 psi (9.0 MPa)
Breaking Strength
Longitudinal
ASTM D751
Procedure B
1867 psi (12.9 MPa)
Waterproofness ASTM D4068 Pass
7-Day Dry Shear Strength ASTM C482 175 psi (1.2 MPa)
7-Day Water Immersion
Shear Strength
ASTM C482 107 psi (0.7 MPa)
4-Week Shear Strength ASTM C482 103 psi (0.7 MPa)
12-Week Shear Strength ASTM C482 105 psi (0.7 MPa)
100-Day Water Immersion
Shear Strength
ASTM C482 113 psi (0.8 MPa)
Permeance ASTM E96
Procedure E

0.06 Perm ( inch-lb )
Water Vapor Transmission ASTM E96
Procedure E

0.104 grain/hrft 2
Service Requirement ASTM C627 Rated Extra Heavy (TCNA)
Resistance to Temperature: min./max. -22°F / +194°F (- 30°C / + 90°C) City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 16
Total Thickness
(approximate)
Physical
measurement
20-30 mils (0.5-0.7 mm)
F. Shower Accessories:

1. Sealant and backer rod and/or bond breaker tape:
a. Application: Expansion & Control Joints, typical
b. Manufacture: Laticrete
c. Product: Latasil
d. Standards:
1) ASTM C794
2) ASTM C920
3) Backer rod: As approved by sealant mfgr. and in accordance with details and TCNA 4) Bond Breaker Tape: As approved by sealant mfgr. and in accordance with details and TCNA
e. Properties:

Service Temperature Range -40°F (-40°C) to +350°F (177°C) Sag or Slump None
Tack Free Time at 77° F (25° C), 50% RH 17 minutes
Tooling Time 7 – 10 minutes
Durometer Hardness -Shore A 27
Tensile Strength 280 psi (1.9 Mpa)
Dynamic Joint Movement +/- 25%
Weatherability, 10,000 hours QUV
Weatherometer
No change
f. Joint Size: Match Grout Width, U.N.O.
g. Color: As Selected by Architect for each Grout Color Condition h. Primer: Latasil 9118 Primer

2. Sealer - Floor Sealer & Slip Protection & Grout Sealer:
a. Application: Typical, U.N.O.
b. Manufacturer: Miracle Sealants & Abrasive Co.
c. Product: 511 Impregnator – Natural look penetrating sealer d. Material: Polymerized Silicone
e. Standard: Static coefficient of friction as herein specified

3. Sealer - Wall and Ceiling Grout Sealer:
a. Application: Typical, U.N.O
b. Manufacturer: Miracle Sealants & Abrasives Co.
c. Products:
1) Typical, u.o.n.: 511 Impregnator – Natural look penetrating sealer City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 17
2) Porous surfaces: 511 Porous Plus – Natural look penetrating sealer a) Use for Sanded Grout
d. Material: Polymerized Silicone
e. Standard: 0.6 max “Static Coefficient of Friction”

4. Cleaner - Surface:
a. Application: Typical
b. Manufacturer: Miracle Sealants & Abrasives Co.
c. Product: Mira Clean #1
G. Accessories: [Specifier, select from the following]

1. Floors - Same Height Transitions:
a. Application: Tile to Carpet and Tile to Tile
1) Manufacturer: Schluter
2) Model: Schiene
a) Provide Schluter Schiene-R at radius conditions
3) Finish:
a) AE Satin Aluminum Anodized
b) A Aluminum
c) E Stainless Steel 304
d) EB Brushed Stainless Steel 304
e) M Solid Brass
[Specifier, additional finishes available in select heights; refer to website for available options and coordinate with tile height]
4) Height: To match finish height of tile when installed b. Application: Tile to Carpet and Tile to Tile – with Edge Capture [Specifier, this is a “T” shaped which can be used at retrofit applications where a transition flange cannot be placed under the tile]
1) Manufacturer: Schluter
2) Model: Reno-T
3) Finish:
a) AE Satin Aluminum Anodized
b) AT Satin Nickel Anodized Aluminum
c) AK Satin Copper Anodized Aluminum
d) AM Satin Brass Anodized Aluminum
e) E Stainless Steel 304
f) EB Brushed Stainless Steel 304
g) M Solid Brass
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 18
4) Height: 11/32” (9 mm)

2. Floors - Different Height Transitions:
a. Application: Tile to lower flooring materials (adjustable slope):
1) Manufacturer: Schluter
2) Model: Reno-V
3) Finish: AE Anodized Aluminum
4) Height: To match finish height of tile when installed 5) Slope Leg:
a) 3/4”
b) 1-3/16”
c) 1-9/16”
b. Application: Tile to lower flooring materials (fixed height) 1) Manufacturer: Schluter
2) Model: Reno-TK
a) Provide Schluter Reno-TK-R at radius conditions [Specifier, not available in stainless steel]
3) Finish:
a) AE Satin Aluminum Anodized
b) E Stainless Steel 304
c) EB Brushed Stainless Steel 304
d) M Solid Brass
e) ACB Bright Chrome Anodized Aluminum
f) AT Satin Nickel Anodized Aluminum
g) ATGB Brushed Nickel Anodized Aluminum
h) ABGB Brushed Antique Bronze Anodized Aluminum
4) Height: To match finish height of tile when installed

3. Cove Shaped Profile - Wall Tile to Floor tile:
a. Application: Aluminum Tile Wall to Tile Floor coved transition 1) Manufacturer: Schluter
2) Model: DILEX-AHK
3) Finish:
a) AE Satin Anodized Aluminum
4) Height: To match finish height of floor tile when installed 5) Accessories:
a) Outside Corner
b) Inside Corner
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 19
c) Connector
d) End Cap
b. Application: Stainless Steel Tile Wall to Tile Floor coved transition 1) Manufacturer: Schluter
2) Model: DILEX-EHK
3) Finish:
a) E Stainless Steel 304
b) EB Brushed Stainless Steel 304
c) EV4A Stainless Steel 316 L
4) Height: To match finish height of floor tile when installed 5) Accessories:
a) Outside Corner
b) Inside Corner
c) Connector
d) End Cap

4. Cove Shaped Profile - Wall Tile to Concrete or Top of Existing Floor:
a. Application: Tiled Wall to Concrete or Top of Existing Floor coved transition 1) Manufacturer: Schluter
2) Model: DILEX-AHKA
3) Finish:
a) AE Satin Anodized Aluminum
b) AT Satin Nickel Anodized Aluminum
c) ATGB Brushed Nickel Anodized Aluminum
[Specifier, additional finishes available; refer to website] 4) Height: To match finish height of floor tile when installed 5) Accessories:
a) Outside Corner
b) Inside Corner
c) Connector
d) End Cap

5. Wall Trim:
a. Application: Vertical Outside Corners, End Cap, and T.O. Tile Trim 1) Manufacturer: Schluter
2) Model: Jolly
a) Provide Schluter Jolly-R at radius wall t.o. tile trim conditions 3) Finish:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 20
a) AE Satin Anodized Aluminum
b. Application: Vertical Mitered Outside Corners, End Cap, and T.O. Tile Trim 1) Manufacturer: Schluter
2) Model: Finec
3) Finish:
a) AE Satin Anodized Aluminum
H. Portland Cement Mortar Floor Bed: Consisting of uniform mortar thickness 1-1/4” min. to 2” max, conforming to ASTM C150, Type 1 and ASTM C144
I. Portland Cement: ASTM C150 Type 1
J. Sand: ASTM C144
K. Water: Potable

2.3 OTHER MATERIALS
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the General Contractor subject to the approval of the Architect.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Examine substrates where tiles will be installed for compliance with requirements for installation tolerances and other conditions affecting performance of installed tile. a. Verify that substrates for setting tile are well cured; structurally sound dry, clean, and free from oil or waxy films, and curing compounds.
b. Verify that substrate is clean and free of dust, dirt, oil, grease, sealers, curing compounds, laitance, efflorescence, form oil, loose plaster, paint, and scale. c. Verify that substrate is level and true to within ¼” in 10’ from the required plane and no more than 1/16” in 12” when measured from the high points in the surface for applications by the thin bed method or for installation of veneer work over thin waterproofing membrane.
d. Verify that substrate is not leveled with gypsum or asphalt-based compounds. e. Very substrate is dry per ASTM D4263 – Standard Test for Determining Moisture in Concrete by the Plastic Sheet Method.

3. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.
a. Do not proceed with installation until unsatisfactory conditions have been corrected.

Commencement of work signifies acceptance of substrate and installation conditions.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 21
B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

2. Confirm all surface treatments, including but not limited to waterproofing and crack isolation membranes, are installed properly before proceeding.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations B. Prepare as follows, but not limited to:

1. Remove protrusions, bumps, and ridges by grinding or chipping.

2. Repair, fill, and level cracks, holes, depressions and rough or chipped areas in substrate using patching material recommended by setting materials manufacturer.

3. Concrete slab to have steel trowel or light broom finish when tile is installed by the thin-set method.
a. Level floors in accordance with Section 03 00 61 - Concrete Floor Leveling, Patching and Grouting – Cementitious.
1) Gypsum material is not allowed.
b. Surfaces shall be clean and well cured.

4. Ensure substrate is within level tolerances:

3.4 INSTALLATION
A. General:

1. Perform work in accordance with ANSI standards, TCNA methods, manufacturer’s installation instructions, and in accordance with the drawings; where in conflict, the most stringent shall apply.

2. Provide threshold trim strips or other edging material where tile terminates at dissimilar finishes, U.N.O.

B. Pre-Treatment

1. Cracks & Joints
a. Fill all substrate cracks, cold joints and control joints to a smooth finish using a Laticrete latex-fortified thin-set.

2. Coves and Floor/Wall Intersections
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 22
a. Fill all substrate coves, floor/wall transitions and changes in plane to a smooth finish using a Laticrete latex-fortified thin-set.

3. Drains
a. Drains must be of the clamping ring type, with weepers as per ASME A112.6.3. b. Waterproof membranes shall connect at the clamping ring (or the integrated bonding flange where specified by TCNA design) to manage water from floor into drain.

4. Penetrations
a. Allow for a minimum 1/8” space between drains, pipes, lights, or other penetrations and surrounding ceramic tile, stone or brick. Pack any gaps around pipes, lights or other penetrations with a Laticrete latex-fortified thin-set.

5. Main Application:
a. Allow any pre-treated areas to dry to the touch prior to proceeding.

C. Placement

1. Place tile material in accordance with patterns indicated or as directed by Architect; carefully plan tile layouts, ensure pattern is uninterrupted from one surface to the next and through doorways.

2. Neatly cut tile around fixtures and drains; accurately from corners, base, intersections and returns.
a. Use tile cutting saw to cut tile, typ.
b. Hone edges of all cut tiles to eliminate rough-cut edges. c. At wall tile penetrations install hole cutout, do not notch. d. Use inside and outside tile trim units as herein specified and/or indicated in Drawings.

3. Ensure tile joints are uniform in width, subject to normal variance in tolerance allowed in tile size. Ensure joints are tight, without voids, cracks, excess mortar or grout; spacers shall be used to set joints between tiles, typical.

4. Install metal edge trim at transitions to door frames.

5. Back butter all tile during installation

6. Sound tile after setting, remove and replace hollow sounding units.

7. Allow tile to set for a minimum 48 hours prior to grouting. a. Provide and install required sealants and caulking at areas around through wall pipes, plumbing, and other wall penetrations.
b. Provide sealant joint where tile butts against other wall finishes.

D. Accessories

1. Install metal inside corner transition trim at floor to wall tile condition.

2. Internal wall angles, external angles and exposed edges shall be made with pre-formed trim shapes as herein specified and/or indicated in Drawings.

E. The word “tile” is used as general name for all floor, wall and counter top materials.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 23
F. Floor area & wall base – Typical, u.n.o.

1. Slab shall be well cured, level and free of cracks

2. Sheet and Liquid Membranes:
a. Install thin set mortar as slurry bond coat over substrate prior to installation of thick bed mortar.
b. Install Crack Protection / Thin-set Sheet Waterproofing membrane over entire floor substrate and up face of wall 8” at tile base, typ.
c. Install Shower Pan Sheet membranes at all shower floors and shower bases in accordance with TCNA and manufacturer's recommendations.
d. Install waterproof membrane and backerboard at all shower walls and ceilings in accordance with TCNA design identified herein and manufacturer's recommendations. e. Test Waterproofing system/assembly with EFVM method or other measure as approved by Architect. Replace / repair all defective conditions discovered by testing. f. Install per manufacturer’s recommendations.

3. Bond coat mortar:
a. Install per manufacturer’s recommendations, TCNA standards and as herein specified and modified.

4. Grout with color as selected by Architect.

5. Joints: Expansion, construction, isolation, contraction and perimeter joints a. Refer to most current TCNA Handbook, Method EJ171-07 for recommendations on locating, treating and detailing various types of construction joints. 1) Joints not to exceed in spacing beyond 25’-0” for interior wall tile 2) Install sealant with bond breaker tape at transitions to dissimilar material 3) Install sealant with bond breaker tape at changes in plane of tile. 4) Install using primer as recommended by sealant manufacturer. 5) Install sealant with backer rod at expansion joints.

6. Tile installation
a. General
1) Custom cutting required to provide curved and miscellaneous special shapes use “Water Jet” cutting method exclusively.
2) Jobsite Blending: blend tiles before installing in accordance with reference standards to produce an even range and distribution of color and finish. b. Installing Tile:
1) Install tile in pattern indicated. Align joints when adjoining tiles on floor, base, walls, and trim are same size.
a) Adjust to minimize tile cutting and to avoid tile less than half size. 2) Smooth cut edges of tile and/or use appropriate cutter or wet saw to produce smooth cuts.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 24
a) Provide straight cuts which align with adjacent materials. 3) Extend tile into recesses and under equipment and fixtures to form a complete covering without interruption.
4) Terminate tile neatly at obstructions, edges, and corners, without disruption of pattern or joint alignment.
5) Provide tile joints uniform in width, subject to variance in tolerance allowed in tile size. a) Make joints smooth and even, without voids, cracks, or excess mortar or grout. 6) Mix mortar in strict accordance with manufacturer’s recommendations. 7) Apply setting material in accordance with manufacturer’s directions and install tile before bonding mortar has started initial cure.
a) For thin set mortar application, use a notch trowel that will achieve the recommended coverage of mortar after tiles have been installed. b) Reference standard coverage information and follow manufacturer’s recommendations for trowel size when using mortars.
8) Do not spread more material than can be covered within 10 to 15 minutes. If “skinning” occurs, remove bonding mortar and spread fresh material. Spread bonding mortar with notches running in one direction, which shall be perpendicular to the pressing, pushing and pulling of tile during placement.
9) Place tile in fresh bonding mortar, press, push and pull the tile slightly to achieve as near 100% coverage and contact of tile with setting material and substrate as possible. a) The coverage shall be no less than 85% and be sufficiently distributed to give full support of the tile.
b) Make sure that all corners and edges are well supported with mortar. Leave no hollow corners or edges.
i. NOTE: 95-100% coverage is mandatory for wet or exterior areas. c) A small amount of bonding mortar can be placed onto the entire back of the tile using a trowel in order to assist in optimum adhesion and coverage of the bonding mortar being used.
10) Ensure there is a minimum 1/8” of bonding mortar between tile and substrate after proper bedding.
a) Installer must periodically remove sheets or individual tiles to assure proper bond coverage consistent with industry specifications.
b) If coverage is found to be insufficient, use a larger size notch trowel. 11) Use a beating block and hammer or rubber mallet so that faces and edges of individual tiles are flush and level with faces and edges of adjacent tiles, and to reduce slippage.

7. Thin Set Method:
a. Install thin set mortar in compliance with herein specified standards and manufacturers recommendations.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 25
b. Use the appropriate trowel notch size to ensure proper bedding of the tile, brick or stone selected.
1) Work the thinset mortar into good contact with the substrate and comb with notched side of trowel.
2) Spread only as much thinset mortar as can be covered while the mortar surface is still wet and tacky.
3) When installing tile/stone, rib/button, lug back tiles, pavers or sheet mounted ceramics/mosaics, spread thin set mortar onto the back of (back-butter) each piece/sheet in addition to troweling thinset mortar over the substrate. a) Beat each piece/sheet into the thinset mortar with a beating block or rubber mallet to insure full bedding and flatness.
b) Allow installation to set until firm.
c) Clean excess thinset mortar from tile or stone face and joints between pieces.

3.5 INSTALLATION – GROUT AND SEALANT JOINTS
A. Grouting:

1. Install grout in accordance with manufacturer’s written instructions.

2. Follow manufacturer’s recommendations for minimum cure time prior to grouting.

3. Remove spacers and debris in grout joints; remove dust/dirt off tile faces using a wet sponge.

Do not leave water standing in joints.

4. Spread using a sharp edged, firm rubber grout float; work grout diagonally across joints, packing them full.

5. Cut excess grout of the tile surface using the edge of the float held at a 90degree like a squeegee stroking diagonally to avoid pulling grout out of filled joints.

6. Initial cleaning of the remaining film/haze can begin approximately at the manufacturer’s specified time after grouting (wait slightly longer at colder temperatures). a. Dip a clean sponge into the bucket and then wring out cleaning solution until sponge is damp.
b. Wipe grout joints and tile surface in a light circular motion, loosening grout residue while keeping the joints smooth and full.
c. Drag a clean sponge diagonally over the scrubbed surfaces to remove any remaining grout residue.
d. Rinse sponge frequently and change wash water at least every 50 s.f. e. Discard sponges as they become "gummy" with residue. f. Check work as you clean. If necessary, repair any low spots with additional grout.

7. Final Cleaning
a. Allow cleaned areas to dry as with initial cleaning and inspect tile/stone surface. b. Begin final cleaning when grout joints are hard to the touch, depending upon the size of the grout joint and the ambient temperature.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 26
c. Use only clean water and simply dunk the white nylon scrub or scouring pad in the water and let all the water pour out – it should be nearly dry and then start to break up the grout haze left from the initial wash on the surface of the tiles. d. Rinse scrub pad frequently, letting all water escape before continuing to clean. e. Then, use a clean cloth to the scrubbed surfaces to remove any residue. f. Allow cleaned areas to dry and inspect tile/stone surface. 1) Make certain to check tile surface with adequate lighting after the tile surface is dry. 2) Continue cleaning until all film/haze has been removed. g. Inspect grout joint for pinholes/voids and repair them with freshly mixed grout.

8. Cautions:
a. Do not use undiluted white vinegar on polished marble or limestone unless a test spot in an inconspicuous area indicates no change in finish appearance; b. Do not use acid cleaners on epoxy grout less than 7 days old.

B. Expansion and Control Joints:

1. Provide control joints (CJ), expansion joints (EJ) and transition joints as located in contract drawings and in full conformity, especially in width and depth, with architectural details and to include the following locations, but not limited to:
a. Wall penetrations
b. Edges of tile abutting dissimilar materials.
c. Floor penetrations.
d. Inside horizontal and vertical corners

2. Installation shall incorporate the following:
a. Substrate joints must carry through, full width, through the tile & stone material. b. Install expansion joints in tile or stone over construction/cold joints or control joints in substrates.
c. Install expansion joints where tile or stone abut restraining surfaces (such as perimeter walls, curbs, columns), changes in plane and corners.
d. Joint width and spacing depends on application - follow TCNA “Handbook for Ceramic Tile Installation” Detail "EJ-171 Expansion Joints" and refer to grout assembly schedule. 1) Joint width: ≥ ⅛” and ≤ 1”.
2) Joint width: depth ~2:1 but joint depth must be ≥ ⅛” (3mm) and ≤ ½”. e. Layout (field defined by joints):
1) 1:1 length: width is optimum but must be ≤ 2:1.
2) Remove all contaminants and foreign material from joint spaces/surfaces, such as dirt, dust, oil, water, frost, setting/grouting materials, sealers and old sealant/backer. 3) Use Laticrete Latasil™ 9118 Primer for underwater and permanent wet area applications, or for porous stone (e.g. limestone, sandstone etc…) installations. 4) Install appropriate Backing Material (e.g. closed cell backer rod) based on expansion joint design and as specified in Section 07 92 00.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 27
5) Apply masking tape to face of tile, brick or stone veneer. 6) Use caulking gun, or other applicator, to completely fill joints with sealant. a) Within 5-10 minutes of filling joint, ‘tool’ sealant surface to a smooth finish. b) Remove masking tape immediately after tooling joint. c) Wipe smears or excess sealant off the face of non-glazed tile, stone or other absorptive surfaces immediately.
7) Floor and wall grout joints shall align from floor to wall when same sizes are used. 8) Use spacers of width specified to set tile and maintain proper grout width. 9) Tool joints to be uniform and within tile edges, remove all grout from face of tile and at inside and outside corners.
10) Tool grout so surface of grout is even with tapered edge of tile.

3.6 INSTALLATION – SEALERS AND SLIP PROTECTION
A. Seal all grout with product as herein specified.

B. Install sealer in accordance with manufacturers.

1. After tile has been grouted, ensure that all grout residues is removed from the surface of the tile with a clean sponge and approved cleaner as herein specified and approved by tile manufacturer.

2. Clean surface to ensure that tile is free of lime and water spots in addition to oil, grease, etc.

3. Allow grout to dry for a minimum of 24 hours.

4. Once tile area has been cleaned and dried, proceed with the sealing of the grout and tile with a sealer as herein specified and approved by tile manufacturer and with manufacturer’s approved applicators.

5. Install sealer per manufacturer’s coverage chart.

6. Install sealer at minimum room temperature of 65ºF.

7. Wipe off excess sealer with a clean towel prior to drying.

8. Allow sealer to dry 60 minutes prior to foot traffic being allowed on the treated surface.

3.7 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.8 FLOOD TESTING
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 28
A. Refer to Division 1 for testing requirements.

B. Shower Pan, Sauna Floor and Steam room floor assemblies:

1. Description:
a. Consists of damming the shower drain followed by independent introduction of water into the shower to test the shower pan assembly for water leakage according to such Plumbing Code standards.

2. Duration: 24 hour

3.9 CLEANING AND PROTECTION OF INSTALLATION
A. If one has been used, remove grout release and clean tile surfaces so they are free of grout residue and foreign matter, in accordance with manufacturer’s instructions. If a grout haze or residue remains, use a suitable grout haze remover or cleaner and contact grout manufacturer for recommendations. Flush surface with clean water before and after cleaning. Do not use harsh hydrochloric, muriatic or sulfuric acid or acid-based cleaners to clean glazed tiles or tiles grouted with latex modified grout.

B. When necessary, acceptable tile cleaning acids or heavy cleaning of grouted with Portland cement grout shall not be done sooner than 10 days after grouting. Tile and grout shall be soaked with water before cleaning. In the absence of a recommendation from the grout manufacturer, acid cleaning may be done with a saturated solution of phosphoric or sulfuric acid, mixed in accordance with manufacturer’s recommendations.

C. After cleaning, provide protective covering and maintain conditions to protect tile work from damage or deterioration. Where tiled surfaces will be subject to equipment or wheel traffic or heavy construction traffic, and during move-in of furniture and equipment, cover protective covering with ¼” hardboard, plywood, or similar material.

D. Leave finished installation clean and free of cracked, chipped, broken, unbonded, and otherwise defective tile work.

E. Consult most current manufacturers “Care & Maintenance” for information on post installation cleanup and routine maintenance.

F. Keep floors installed with epoxy adhesive closed to foot traffic for 24 hours @ 70ºF, and to heavy traffic for 48 hours @ 70ºF unless instructed differently by manufacturer. Use kneeling boards, or equivalent, to walk/work on newly tiled floors. Cure tile work in swimming pools, fountains and other continuous immersion applications for 10 days @ 70ºF for epoxy grout and 14 days @ 70ºF for latex Portland Cement based grout before flood testing or filling installation with water. Extend period of protection of tile work at lower temperatures, below 60ºF, and at high relative humidity (>70% RH) due to retarded set times of mortar/adhesives. Replace or restore work of other trades damaged or soiled by work under this section.

G. Protect Crack Protection / Thin-set Waterproofing Membrane Assembly during construction prior to installation of tile.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 29

3.10 MAINTENANCE
A. Product shall be installed, cleaned, and sealed as herein specified and in accordance with each specific flooring manufacturers recommendations to maintain the following of their installed product, but not limited to:

1. Slip Resistance

2. Published (ADA approved) Slip Resistance Coefficient of Friction

3. Warrantee requirements
B. Product shall be maintained by Owner after occupancy to maintain the Slip Resistance and coefficient of friction rating.

C. Refer also to PROTECTION AND CLEAN UP heading.

3.11 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition, so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor's NOTICE of “Certificate of Substantial Completion”.

END OF SECTION 09 30 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
TILE AND STONE 09 30 00 - 30

THIS PAGE IS INTENTIONALLY BLANK
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 1 SECTION 09 51 00 – ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Suspended metal tee-bar grid system complete with wall trim, hanger wire, fasteners, seismic clips, compression posts, etc. and as specified and detailed.

2. Acoustical ceiling tile panels.

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction:
a. All occupancy types.

C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. American Society for Testing and Materials (ASTM)

1. ASTM C423 Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method.

2. ASTM C635 Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings

3. ASTM C636 Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels

4. ASTM E84 Surface Burning Characteristics Classification.

5. ASTM E119 Fire Tests of Building Construction and Materials.

E. Ceilings & Interior Systems Construction Association, www.CISCA.org F. International Code Council, ICC

1. ICC-ES Evaluation Reports
G. Underwriters Laboratory (UL)

1. Fire Resistance Directory, Acoustical Materials (BYIT) H. Ceilings & Interior Systems Construction Association (CISCA) City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 2

1. Ceiling Systems Installation Handbook, most current edition I. Abbreviations:

1. AC: Articulation Class.

2. CAC: Ceiling Attenuation Class.

3. LR: Light Reflectance Coefficient.

4. NRC: Noise Reduction Coefficient.

5. HRC: Recycled Content

6. Recycled Content: Average percentage based on weight of component materials. Material recovered or diverted from the solid waste stream, either during the manufacturing process (pre-consumer) or after consumer use (postconsumer).

1.3 PERFORMANCE, TESTING AND INSPECTION
A. General:

1. Comply with manufacturer’s standards.

2. Comply with Building Code.

3. Job site inspections shall be done as herein specified and as listed in drawings.

4. Testing shall be done as herein specified and as listed in drawings.

B. Standards:

Item Name of Test Performance Testing Std.

Evaluation Report
for construction
Comply • ICC Evaluation Service,
ICC-ES Evaluation Report,
ESR-1308
• ASCE7 -05 to ASCE7-10
Seismic Technical Guide
Grid Flame Spread Class I, 25 or less UL
Main TEE load
capacity
ASTM C635, CBC, ASCE/SEI 7
and CISCA Guidelines
Cross TEE load
capacity
16 lbs./lf.

TEE Bar grid mfgr.

Tee Bar Grid
Assembly
System Installation Comply CISCA Handbook and ASTM
C636
Building code, Section 808
Spacing 12’-0” x 12’-0” spacing
Out of Plumb 1 horizontal x 6 vertical max
Slenderness Ratio (kl/R) 200 or less
Attachment to main
runner
Attach within 2” of cross
member
CBC Sect. 803.9, ASTM C-635
& 636
ESR-1222 DONN/USG
Approved EMT Suspension mfgr’s assembly
Compression
Posts
Framing
Stud framed posts Refer to drawings
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 3 Design category Heavy Duty Design Category D Building Code chapter 16, ASCE7-05, CISCA, ASTM C635, Structural drawings
Assembly
Seismic Rating
Earthquake Loads Comply Building Code, ASCE7-05,
CISCA, ASTM C-635
Splayed wires angle 45 degrees max and taut
Gauge 12 Ga.

ASTM C-635 & 636
Diagonal wire -
Attachment turns
4 tight turns over a distance of

1.5” max
Wires
Vertical wire -
Attachment turns
3 tight turns over a distance of

1.5” max
CBC Sect. 803.9, ASTM C-635
& 636
Seismic Clips Seismic assembly
and compliance
Comply CBC and mfgr’s design and
product requirements
Attachment lag
screws
Type I type Lag Screws ICC ER-5397 & Building code
Section 808
Light fixtures Hanging
requirements
Min. 12ga. hanger wires must
be attached to the supporting
Cross Tee within 3” of the each
corner of the fixture
CBC, ASCE/SEI 7 and CISCA
Guidelines
Sag Resistant Comply for 30 years
Mold Growth No growth for 30 years
ASTM C367
Fire Rating 25 or less
Lay-In Panels
Smoke Developed Index 50
ASTM E84
Refer to drawings and as herein specified
C. Sustainability:

1. Refer to Division 1 sustainability requirements.

2. Refer to product criteria identified herein.

1.4 SUBMITTALS
A. Refer to Division 1 for substitution, deviation and/or submittal procedures.

B. Submit O&M (Operation and Maintenance) manuals in accordance with Division 1 requirements and as herein specified.

C. Refer to Division 1 for sustainability requirements
D. Submit Manufacturer’s data and shop drawings.

1. Catalog cuts or standard drawings showing details of system with project conditions clearly identified and manufacturer’s recommended installation instructions.

2. Reflected ceiling plans:
a. Contractors shall submit a layout arrangement of ceiling design, dimensions and locations of related integrated lighting and air distribution components.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 4

3. Installation drawings:
a. Detail complete installation including suspension system, installation of related lighting and air distribution components, access requirements, sound absorption requirements, and fire rating requirements when applicable.

4. Compression posts assembly, compliance guidelines and details for assembly and attachment.

E. Submit samples.

1. (6) 6”x6” sample of each color and finish of all exposed materials.

2. (6) pieces of each type of Grid x 12” long

3. (6) Angle moldings pieces x 12” long

4. (6) Seismic clips
F. Certification and Test Reports:

1. UL Acoustical Compliance:
a. For acoustical performance, each carton of material must carry Underwriters Laboratories certification for AC (if applicable), CAC and NRC.

2. UL Suspension System Load Compliance:
a. Manufacturer must certify that the metal suspension system is UL Classified to be load compliant per ASTM C635. For load compliance, each carton of main tees must carry Underwriters Laboratories certification for load compliance.

3. Test reports: Manufacturer will provide test certification for minimum requirements as tested in accordance with applicable industry standards and/or to meet performance standards specified by various agencies.

1.5 QUALITY ASSURANCE
A. Refer to Division 1 for quality control requirements.

B. Contractor / Installer / Fabricator shall have been in business for five (5) years providing / installing / finishing similar size projects and complexity.

C. Manufacturer shall have been in business for five (5) years providing / installing / finishing similar size projects and complexity.

D. Material with lead times in question or confirmed to be in conflict with meeting the schedule and sequence of construction must be documented at time of bid.

E. Stipulations:

1. Standard for terminology and performance: Applicable publications by Acoustical and Insulating Materials Association (AIMA), including "Performance Data, Architectural Acoustical Materials".

F. Pre-Installation Conference: A pre-installation conference shall be held prior to commencement of field operations to establish procedures to maintain optimum working conditions and to coordinate this work with related and adjacent work. General Contractor shall request meeting 5 days in advance of construction. Agenda for meeting shall include, but not limited to:

1. Ceiling mounted fixtures, etc.

2. Ceiling penetrations
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 5

3. Sprinkler heads

4. HVAC ducting and grills

5. Compression posts – assembly/construction
G. Manufacturer’s Representative: Make arrangements necessary to have a trained employee of the manufacturer on-site periodically during installation work to review installation procedures.

1. Manufacturer’s representative shall review and certify in writing all phases of construction to verify the complete work meets specification requirements.

2. Written certification of all phases of construction shall be sent to the Architect by the manufacturer’s representative.

H. Miscellaneous criteria:

1. Changes from system: System performance following any substitution of materials change in assembly design must be certified by the manufacturer.

2. Seismic Bracing: Provide as required by Code and specific herein.

1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Refer to Division 1 for product delivery, storage and handling requirements.

B. All materials shall be delivered in their original unopened packages and stored in an enclosed shelter providing protection from damage and exposure to the elements.

C. Storage time of materials at the jobsite should be as short as possible, and environmental conditions should be as near as possible to those specified for occupancy, refer to “Environmental Conditions” heading.

1. Excess humidity during storage can cause expansion of materials and possible warp, sag, or poor fit after installation.

2. Chemical changes in the mat and/or coatings can be aggravated by excess humidity and cause discoloration during storage, even in unopened cartons.

3. Cartons should be removed from pallets and stringers to prevent distortion of material.

4. Long-term (6-12 months) storage under uncontrolled environmental conditions should be avoided.

D. Damaged or deteriorated materials should be removed from the premises.

1. Immediately before installation, to stabilize tile and panels, store them at a location where temperature and humidity conditions duplicate those ambient during installation and anticipated for occupancy.

1.7 JOB CONDITIONS
A. Field-verify that all components, substrates, backing, etc. provided by others are installed correctly before proceeding with installation of products as herein specified.

B. Installation of acoustical panels shall not begin until building is enclosed, permanent heating and cooling equipment is in operation, and residual moisture from plaster, concrete, or other work as dissipated.

C. Do not use ceiling panels in extreme or continuous high humidity, or areas exposed directly to weather or water.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 6

1. Ceiling panels are sized and designed for use within the standard occupancy range of temperature and humidity, 65-85°F (18-29°C), no more than 70% RH (relative humidity).

2. Humidity can greatly affect product dimensional stability and sag resistance.

3. Sag can become noticeable during periods of high humidity lasting only a few hours.

D. Allow time for dimensional changes in ceiling panels stored at temperature/humidity conditions well outside of those recommended for service.

1. With increases in temperature/humidity, these products expand (up to 1/64 in./ft. (4.3 mm/m) at 85°F (29°C)/90% RH) and may not fit into a fixed grid.

2. Conversely, with decreases, these products will be undersize, but expand to normal when standard ambient conditions return.

E. For some pattern edge details, if perimeter panels must be cut smaller, the cut edge must be fieldrabbetted, or the wall angle must be lowered by (1/4") (3/8”) (Reveal Depth).

F. Environmental requirements for interior installation:

1. Building shall be enclosed with windows and exterior doors in place and glazed, and roof watertight before installation of ceiling system and related ceiling components.

2. Climatic condition range of 60-85°F (16-29°C) with a max 75% RH.

G. Coordination with other work:

1. Mechanical work: Ductwork above ceiling shall be complete and permanent heating and cooling systems operating to climate conditions prior to installation of ceiling components.

2. Electrical work: Installation of conduit above ceiling shall be complete before installation of ceiling components.

3. Fire protection work: Fire protection lines and/or equipment occurring above ceiling shall be completed and tested before ceiling components are installed.

H. Protection: Protect completed work above ceiling system from damage during installation of ceiling components.

1.8 PROTECTION
A. Protect finish surfaces at all times from surfaces and material adjacent to them.

B. Finish work defaced with other materials on surface shall be replaced.

C. Protect work under this section from damage by other trades.

1.9 GUARANTEE / WARRANTY
A. Refer to Division 1 for closeout submittal procedures.

B. Furnish initial one (1) year written warranty signed by manufacturer and installer agreeing to repair and/or replace work which has failed as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

C. Furnish manufacturer’s additional thirty (30) year warranty agreeing to repair and/or replace Suspension material that has had an occurrence of 50% or more of Red Rust as defined by ASTM test procedure work and has failed as a result of defects in materials or workmanship.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 7

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

D. Furnish manufacturer’s additional thirty (30) year warranty agreeing to repair and/or replace lay in panels which show visible sag as a result of defects in materials or workmanship.

1. Upon notification of Owner within the warranty period, such defects shall be repaired and replaced at no cost to the Owner.

1.10 RELATED WORK/SECTIONS
A. Related work includes, but is not limited to, the following:

1. Overhead Construction

2. Wall Construction

3. All Recessed/Attached Components, including, but not limited to:
a. Sprinkler Heads
b. Lighting – recessed and suspended
c. Low Voltage Devices
d. HVAC grills/diffusers
e. Speakers
f. Security camera’s
g. Floor or roof structure above
h. Wall framing and finish
i. Wall backing
j. Ceiling framing
B. Related Sections include, but are not limited to the following:

1. Division 1

2. Section 09 22 16 – Non-Structural Metal Framing

3. Section 09 29 00 – Gypsum Board & Sheathing Substrates

1.11 OPERATION AND MAINTENANCE DATA
A. Submit as part of project closeout:

1. Complete instructions regarding maintenance of the materials, finishes, etc.

2. Refer to Division 1 for closeout submittal procedures.

1.12 SEQUENCING AND SCHEDULING
A. Schedule work and sequence with General Contractor.

B. Schedule required testing, prior to the installation of materials, components, etc.

1.13 EXTRA MATERIALS
A. Submit as part of project closeout:

1. Provide extra material for each product type, color, finish, etc. in same lot as installed product. a. Furnish written certification that extra materials supplied have been inspected and reconfirmed to be the same as those used in the Work.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 8

2. Provide extra material in unopened fully labeled containers. a. Do not supply anything less the full carton containers. b. Furnish in factory packaged and labeled cartons and identify cartons with Project name. c. Deliver materials to project premises just prior to substantial completion, and store at location directed by the Owner.

3. Provide the following
a. 5% of total panels installed for each type
PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS
A. Single source responsibility, specified items shall be from one manufacturer.

B. Acceptable manufacturer shall be one of the following and as herein listed and in Drawings:

1. Acoustical Tile & Standard Grid:
a. DONN/USG Interiors, Inc. www.usg.com
b. Armstrong www.armstrong.com
c. Linder, www.linderusa.com

2. Accessories:
a. Flannery, Inc., www.flannerytrim.com

3. Fasteners:
a. I-LAG Brand Screws
b. Approved equivalent that meets ESR report herein listed

4. Reviewed Equivalent by Architect.
a. Substitutions and deviations shall require Architect’s approval and shall be given in letterform.
b. Refer to Division 1 for substitution, deviation and/or submittal procedures. c. Proposed alternate products must be equal in terms of chemical composition, color, finish, configuration, performance standards, etc.

C. All products and materials indicated shall be installed according to current listed specification requirements and manufacturers specifications/recommendations.

D. Refer to drawings, details, and other related specification section whether listed or not.

E. Details shall set basic requirements for size and configuration of systems.

2.2 MATERIALS
A. Acoustical Tiles:

1. Schedule:
a. Type: CL3 (Refer to Drawings)

1. Mfgr: Armstrong
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 9

2. Type: Layin

3. Material: Wet-formed mineral fiber

4. Edges: Square

5. Model: Calla

6. Color: White

7. Standards:

1. Fire Rating: No

2. NRC: 0.85

3. Light Reflect: 0.84

4. CAC: 35

5. R Factor:

1. 2.9 (BTU units)

2. 0.445 (WATTS units)

6. Classifications:

1. Type IV, Form 2, Pattern E (ASTM E 1264)

8. Item No. 2820

9. Size: 24” x 24” x 1”

10. Features:

1. Recycled Content: 51% min.

2. Sag Resistant: HumiGuard®

3. VOC: Meets CA Dept. of Health Services Standard Practice

4. Anti-Mold/Mildew: BioBlock® Plus

5. Scrubs: 10,000 (withstand up to)

11. Warranty: 30 year system

12. Grid Options: 15/16”
B. Suspended Grid Systems:

1. General:
a. Type:

1. Restrained system

2. Direct suspension, supported and braced by connections to overhead structures.

3. Heavy-duty, meeting requirements Building Code Standards, and as specified. b. Components:

1. Factory fabricated, punched, and otherwise prepared to facilitate rapid installation with minimum Field Work for typical conditions.

2. Items of like type and size shall be readily interchangeable without modifications. c. Grid Runners:

1. Type: Double-web section type, formed from steel strip in thickness required to meet heavy-duty classification.
d. Exposed-grid Accessories:

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 10

1. Perimeter angles molding, reveals, and other items detailed; roll formed from electro galvanized steel strip to sizes indicated or required for Project conditions, and as accepted.

2. For fixed connection of runner ends to wall angels, 1/8-inch-diameter steel pop rivets, color matched to grid system.

3. Finish exposed components to meet requirements specified for grid system with which used.
e. Panel Hold-Down Clips:

1. Provide for panels less than typical field size, and panels within 20-feet radius of an exterior door.
f. Seismic Clips.

1. Mfgr’s building code compliant clips.

2. Schedule:
a. Standards:

1. Fire Rating: None

2. Type: Heavy Duty

3. Recycled Content: Yes (HRC)
b. Finishes:

1. Flat White Standard Painted Metal - Manufacturer's factory finish c. System:

1. Main TEE:
a. Manufacturer: Armstrong World Industries
b. Model No: 7301WH
c. Size: 15/16" face x 12’-0” long
d. Duty: Heavy
e. Recycled Content: Up to 63%

2. Cross TEE:
a. Manufacturer: Armstrong World Industries
b. Model No: Length: Height: Recycled Content:

1. XL7328WH 2’-0” 1-11/16”” up to 63% total

2. XL7330WH 3’-0” 1-11/16” up to 63% total

3. XL7340WH 4’-0” 1-11/16” up to 63% total

4. Face Size: Match Main Tee
d. Accessories:

1. Including, but not limited to;
a. Perimeter wall angles & accessories:

1. Wall angle:
a. Mfgr: Armstrong World Industries
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 11 b. Type: Hemmed Angle Wall Moldings
c. Horizontal leg: 2”
d. Model: 7808WH

2. Seismic Clip – Main beam
a. Mfgr: Armstrong
b. Model: SJMR15

3. Seismic Clip – 4 way
a. Mfgr: Armstrong
b. Model: SJCG

4. Light Fixture Clip
a. Mfgr: Armstrong
b. Model: LFC
C. Suspension Materials & Fastenings:

1. General:
a. Comply with requirements of building code
b. Comply with standards as herein specified
c. Comply with mfgr’s standards

2. Wire:
a. General: ASTM A641, galvanized steel, regular coating soft temper; factory pre-straightened units.
b. Hanger and Safety Wires: 12 gauge.
c. Ceiling and Partition Bracing Wires: 10 gauge

3. Turnbuckles: As required for leveling grid assemblies, of adequate size, electroplated.

4. Fastenings for Accessories:
a. General:

1. Bolts or screws or adequate size, in type appropriate for conditions and materials involved, and made corrosion-resistant materials or coated as accepted.

2. Concealed only, unless otherwise indicated or accepted. b. I Lag Screws:

1. Mfgr: I-LAG Brand Screws or approved equivalent

2. Model:

1. Wood framing: 150 SD

3. Type: Self Tapping

4. Length: 2-3/4”

5. Material: Galvanized 1018 steel

6. Heat treated: Yes

7. Wire attachment hole: Round

8. Approvals: ICC ESR-5367
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 12 D. Miscellaneous Products

1. Perimeter Trim:
a. Steel channel type trim, color keyed to grid system. b. White color closely keyed to tile color.
c. Required for each installation area, unless otherwise indicated.

2.3 OTHER MATERIALS
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the General Contractor subject to the approval of the Architect.

PART 3 - EXECUTION

3.1 INSPECTION / EXAMINATION
A. Verification of Conditions:

1. Examine areas and conditions under which work is to be performed.

2. Identify conditions detrimental to proper or timely completion of work and coordinate with General Contractor to rectify.

B. Surface:

1. Examine and verify that receiving conditions of substrate have no defects or errors, which would result in poor or potentially defective application or cause latent defects in workmanship.

3.2 COORDINATION
A. Refer to Division 1 for project coordination requirements.

B. General Contractor shall coordinate work as herein specified, in accordance with drawings and as required to complete scope of work with all related trades.

3.3 PREPARATION
A. Prepare work, substrates, etc. in accordance with manufacturer’s recommendations.

B. Field dimensions must be verified prior to installation.

3.4 INSTALLATION
A. General:

1. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

2. Except as modified by this Section, install suspension system and acoustical tiles in accordance with manufacturer's instruction.

3. Layout acoustical ceilings to provide symmetrical borders not less than half the size of the tile or panel specified.

4. Install suspension systems and tile so that tile joints are aligned, perpendicular and parallel to room or space in which they are installed as indicated in the drawings. Install tiles with pattern runner in one direction.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 13

5. Install the work of this Section so that completed ceilings will be level within 1/8" in 12 ft. of the ceiling line. Printed instructions; comply with governing regulations, requirements as indicated, and industry standards applicable work.

B. Standard reference:

1. Install ceiling panels and suspension system, including necessary hangers, grillage, splines, and other supporting hardware, in accordance with ASTM C636, CISCA Installation Stds., (UL Design) and any applicable code requirements.

C. Manufacturer’s reference:

1. Install ceiling panels in exposed grid systems, supported on all edges, in accordance with manufacturer’s current printed recommendations and in compliance with code and agency criteria.

D. Drawing reference:

1. Install ceiling panels in accordance with approved shop drawings and manufacturer’s requirements.

E. Installation of Suspension System:

1. 12 ga. (min.) Hanger wires may be used for up to and including 4'-0" x 4'-0" grid spacing. Splices will not be permitted in any hanger wires.

2. Provide hanger wires within 8" of the ends of all main and cross runners or at 1/4 of the length of the end tee, whichever is least at the perimeter of the ceiling area.

3. Provide trapeze or other supplementary support members at obstructions to maintain hanger spacing. Provide addition hangers, struts or braces as required at all ceiling breaks, soffits of discontinuous areas. Hanger wires that are more than 1 in 6 out of plumb are to have counterbraced wires.

4. Ceiling grid members may be attached to not more than 2 adjacent walls. a. Ceiling grid members should be at least 1/2 inch free of other walls. b. If walls run diagonally to ceiling grid system runners, one end of main and cross runners should be free and a minimum of 1/2 inch clear of wall.

5. At the perimeter of the ceiling area where main or cross runners are not connected to the adjacent wall, provide interconnection between the runners at the free end to prevent lateral spreading. Where the perpendicular distance from the wall to the first parallel runner is 12" or less, this interlock is not required.

6. Provide sets of 4-#12 ga. splayed bracing wires oriented 90 degrees from each other and compression strut at the following spacing, and scope:
a. Place sets of splay wires with compression strut at a spacing not more than 12 feet by 12 feet on center, and not more than 6 feet from all perimeter walls. b. Provide splay wires at the edge of vertical ceiling offsets. c. The slope of splayed wires should not exceed 45 degrees from the plane of ceiling and should be taut without causing the ceiling to lift. Splices in bracing wires are not permitted.

7. Fasten hanger wires with not less than 3 tight turns. a. Fasten splay wires with 4 tight turns.
b. Make all tight turns within a distance of 1-1/2 inches.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 14 c. Hanger or bracing wire anchors to the structure should be installed in such a manner that the direction of the work aligns as closely as possible with the direction of the forces acting on the wire.

8. Separate all ceiling hanging and bracing wires at least 6 inches from all unbraced ducts, pipes, conduits, etc.
a. It is acceptable to attach lightweight items, such as single electrical conduit not exceeding 3/4-inch nominal diameter, to hanger wires using connector acceptable to manufacturer.

9. Attach all light fixtures to the ceiling grid runners (Or to the floor or roof structure above, in the case of pendent fixtures) to resist a horizontal force equal to the weight of the fixtures.

10. Flush or recessed light fixtures and air terminals or services weighing less than 56 pounds may be supported directly on the runners of a heavy duty grid system but, in addition, they must have a minimum of 2 - #12 ga. slack safety wires attached for diagonal corners and anchored to the structure above.
a. All 4 ft. x 4 ft. light fixtures must have slack safety wires at each corner.

11. All flush or recessed light fixtures and air terminals or services weighing more than 56 pounds must be independently supported by not less than 4 #12 ga. taut wires attached to the structure above regardless of the type of ceiling grid system used. a. The 4 taut #12 ga. wires including their attachment to the structure above must be capable of supporting 4 times the weight of the unit.

12. Support surface mounted light fixtures by at least two positive devices which surround the ceiling runner and which are supported from the structure above by a #12 ga. wire. a. Spring clips or clamps that connect only to the runner are not acceptable.

13. Support pendant mounted light fixtures directly from the structure above with hanger wires or cables passing through each pendant hanger and capable of supporting 4 times the weight of the fixtures.

F. Installation of Acoustical Tile:

1. All cut edges of tile shall meet the following criteria; a. Cut new Tegular edge to match existing at Tegular tile. b. Paint edges of exposed cut tile with factory paint to match tile color.

G. Radius Components

1. General
a. Attach the wall angle to the wall through metal hanger strap to insure a snug fit.

2. Outside Radius Installation
a. A heat gun is required for outside radius installations. b. Attach one end of wall angle to wall with any standard fastener system, including industrial adhesives.

1. However, if adhesives are used, a mechanical fastener must also be used.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 15 c. Continue to ‘walk’ down the wall with any standard fastener, every 1 – 3” (depending on the radius) until entire wall angle section is installed.
d. To size length of wall angle, install as instructed above until the radius ends. Take a utility knife and SCORE the wall angle where you want the radius to run. Break the wall angle at the scored lines.

3.5 MAINTENANCE
A. Cleaning: Panels can be cleaned easily with a soft brush, vacuum, or dry chemical sponge.

B. Repainting:

1. Spray a thinned, non-bridging vinyl-acrylic flat wall paint. a. The type of paint selected and the method of application can alter the acoustical performance and fire ratings of any acoustical product.

2. Clean exposed surface of acoustical ceilings, including trim, edge moldings and suspension member; comply with manufacturer's instructions for cleaning and touch-up of minor finish damage.
a. Remove and replace work, which cannot be successfully cleaned and repaired to permanently eliminate evidence of damage.

3.6 ADJUSTING
A. Adjust any sags or twists, which develop in ceiling systems, and replace any part, which is damaged or faulty.

3.7 FIELD QUALITY CONTROL
A. Product manufacturer shall provide field service support as requested by the Installer/Applicator

1. General Contractor and the product manufacturer shall make periodic on-site inspections to ensure that the materials are being installed in strict accordance with manufacturer’s specifications.

2. The Applicator shall be responsible for the proper application of the materials.

B. The Applicator shall certify in writing the quality of work performed relative to the substrate system, details, installation procedures and workmanship is in accordance with project specifications and manufacturer's instructions.

3.8 PROTECTION AND CLEAN UP
A. Refer to Division 1 for protection and cleaning requirements.

B. Subcontractor will keep the work areas in a clean and safe condition so his rubbish, waste, and debris do not interfere with the work of others.

C. Protect work and materials of this Section prior to and during installation, and protect the installed work and materials of other trades.

1. Clean adjacent surfaces free of caulking or sealant with mechanical action or solvent as necessary, avoiding damage to other materials.

City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
ACOUSTICAL CEILING SUSPENSION SYSTEM AND TILE 09 51 00 - 16 D. Perform work in accordance with manufacturer’s recommendations, as herein specified and in accordance with drawings.

E. In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no cost to the Owner.

F. After completion of work in this section, remove all erection equipment and implements of service, and debris.

1. Leave entire area in a neat, clean, acceptable condition.

G. Provide Guarantee/Warranties and Bonds as required in this specification section and as listed in Division 1 closeout submittal procedures.

H. Provide record drawings in accordance with Division 1 closeout submittal procedures.

I. Close out, on-site inspection will be at the discretion of the Architect after he receives the General Contractor’s NOTICE of “Certificate of Substantial Completion”.

END SECTION 09 51 00
City of Roseville 19six Architects Project No. 210015.01 Dry Creek Wastewater Treatment Plant AHJ Project #: XX-XXXXXX Operations and Lab Building
Project Specifications
RESILIENT BASE AND ACCESSORIES 09 65 13 - 1
SECTION 06 65 13 – RESILIENT BASE AND ACCESSORIES
PART 1 - GENERAL

1.1 PRINCIPAL WORK IN THIS SECTION
A. The requirements of the Owner’s General and Supplementary Conditions, and Division 0 and Division 1 general requirements apply to the work of this Section.

B. Coordinate the work of this Section with related trades.

C. Verify applicable dimensions, clearances and heights at the jobsite.

D. Furnish materials and perform labor required to execute this work as indicated on the drawings, as specified herein and as necessary to complete the work required by project conditions, including but not limited to:

1. Moldings

1.2 REFERENCE STANDARDS
A. 2022 California Code of Regulations (CCR), Title 24, California Building Standards Commission (CBSC) www.bsc.ca.gov current edition at time of permit issuance.

B. (CCR) Title 24, (CBSC) Chapter 11 – California Green Building Standards Code

1. Non-residential new construction
a. All occupancy types
C. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines, current version.

D. Aluminum Association (AA), www.aluminum.org
E. American Society for Testing and Materials (ASTM), www.astm.org

1. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials

2. ASTM E648 - Standard Test Method for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source

3. ASTM E662 - Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials