Record Keeping Requirements (SSMP 7.4)
• Level of Effectiveness: As discussed in the previous section, FOG control program responsibilities transitioned from IWS to WWC in 2016, but during the audit period, IWS operated the program. The City requires in RMC Section 14.14.260 that permitted FSEs retain logbooks on grease control device maintenance cycles, FOG hauling records, sampling data and sludge height monitoring in FOG control devices, BMPs, and records of private lateral SSOs and subsequent mitigation. The recordkeeping requirements and time frames identified in the RMC have enough information necessary for the City to enforce permit requirements of FSEs.
• Recommendations: No modifications recommended at this time.

Legal Authority to Prohibit SSOs and Blockages Caused by FOG Discharges (SSMP 7.5) • Level of Effectiveness: The RMC Section 14.12.050 provides the City with a FOG ordinance and legal authority to require FOG interceptors when deemed necessary by the director. The ordinance prohibits FOG-related blockages and SSOs and limits the maximum allowable concentration of FOG in FSE discharges at the current level of 100 mg/L of wastewater. This ordinance is effective in providing the City with the tools necessary to minimize FOG discharges into the sewer system. • Recommendations: No modifications recommended at this time.

BMP, Grease Removal Devices, Recordkeeping, and Reporting Requirements (SSMP 7.6) • Level of Effectiveness: The City requires all FSEs that discharge FOG to acquire a FOG WDP permit which includes provisions for FSEs to maintain BMPs and grease interceptors, cleaning records, and to report private FOG-related SSOs or blockages. The FOG WDP requirements are effective in providing the City with the tools to limit FOG discharges into the sewer system.

• Recommendations: No modifications recommended at this time.

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 29
Inspection and Enforcement Authority – FOG Producers (SSMP 7.7) • Level of Effectiveness: All FSEs that discharge FOG are required to obtain and comply with a City FOG WDP. Under the permit, the FSE must comply with the FOG ordinance as detailed under the RMC, and the City maintains the legal authority to physically inspect the FSE and determine if it is in compliance.

The City possesses effective tools to regulate FOG discharges via a robust FOG ordinance which also requires an effective FSE inspection program. Under oversight from WWC, the City plans on inspecting at least 294 FSEs each fiscal year During this audit, the city documented 0 FSE inspections for FY 18/19, 0 inspections for FY 19/20, and 221 inspections for FY 20/21. The lack of inspections could be due to equipment or due to Covid Pandemic however since only one SSO was caused by FOG, the FOG inspection and enforcement authority element of the SSMP has been effective. • Recommendations: No modifications recommended at this time.

FOG Characterization Assessment and Hot Spot Cleaning Schedule (SSMP 7.8) • Level of Effectiveness: The City has been effective in limiting FOG-related SSOs to one during the threeyear audit period by identifying and placing assets impacted by FOG as a last resort on the hot-spot, high frequency 3-month cleaning list. If the City encounters abnormal FOG levels in a pipe it will first reach out to FSEs and residents that it thinks may be contributing to it and distribute pamphlets to them to minimize FOG discharges. If that does not solve the problem, then the asset is put on the hot-spot list.

Approximately 60% of the 90 hot-spot assets have FOG-related issues that require significant City resources to clean every 3 months.
• Recommendations:
o Modify the EU Engineering GIS database to include hotspot assets and FSEs and add them as layers to the maps that WWC receives.

FOG Control Program Measures (SSMP 7.9)
• Level of Effectiveness: The City has established that all FOG-producing FSEs acquire a FOG WDP which limits discharge of FOG, requires proper O&M records, hauling record, BMPs, and other conditions. The FOG Control Program measure provides the City’s with an effective tool to limit FOG discharges from FSEs.
• Recommendations: No modifications recommended at this time.

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 30

5.8 System Evaluation and Capacity Assurance Plan

5.8.1 Compliance
Table 16 – Compliance with SSS WDR D.13.viii - SECAP
SSMP Requirement Compliance Deficiencies
viii(a) Evaluate hydraulic deficiencies Yes -
viii(b) Establish design criteria Yes -
viii(c) Establish short- and long-term CIP Yes -
viii(d) Develop schedule of completion dates
for CIP
Yes -

5.8.2 Effectiveness of SSMP Elements and Recommended Modifications Evaluation Process – Capacity Enhancement Projects (SSMP 8.2) • Level of Effectiveness: The City has developed two hydraulic simulation models to identify peak flows in the collection system in 2006. In addition, the City developed a new hydraulic model and System Evaluation and Capacity Assurance Plan (SECAP) in 2017, which was done by Woodard and Curran. The modeling efforts conducted in 2006 and 2017 have been effective in evaluating the system and planning for future growth, which is evident from no capacity-deficiency-related SSOs during this audit period. In 2018, Water Works Engineers (WWE) conducted a follow up I/I study upon the existing 2017 model to further analyze results and identify basins and assets with high I/I response. The results of the 2018 I/I study is being actively used by the City as their I/I reduction program base. • Recommendations: Modify Appendix I-1 of the SSMP to indicate that the system evaluation and capacity assurance plan will be reviewed and updated every 10 years. This was also recommended during the previous two audit but has not been implemented.

Design Criteria (SSMP 8.3)
• Level of Effectiveness: The City established a 10-year, 24-hour peak design storm for the hydraulic wet weather loading of the existing collection system along with flow generation factors based on water use records and flow monitoring data. Based on the lack of capacity-related SSOs during the audit period, it appears the City’s capacity design criteria are effective. • Recommendations: No recommended modifications at this time.

Capacity Enhancement Measures (SSMP 8.4)
• Level of Effectiveness: The SPWA Wastewater Systems Evaluation includes the identification of short and long-term Capital Improvement Project (CIP) to meet current and future wastewater flows. The new hydraulic model introduced in 2017 provides new capacity enhancement measures.

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 31
• Recommendations: No modifications recommended at this time.

Capital Improvement Program Schedule (SSMP 8.5)
• Level of Effectiveness: The City lists the goal of the CIP is to develop annual project bundles of approximately $1.5 to $2.0 million based on WWC condition assessment data and the hydraulic model CIP results and subsequent flow monitoring or studies. The CIP schedule is effective in identifying the tasks required to assure hydraulic capacity within the collection system. • Recommendations: No modifications recommended at this time.

5.9 Monitoring, Measurement, and Program Modifications

5.9.1 Compliance
Table 17 – Compliance with SSS WDR D.13.ix – MMM
SSMP Requirement Compliance Deficiencies
ix(a) Maintain metrics to prioritize SSMP activities Yes - ix(b) Measure effectiveness of SSMP elements Yes
The City does have performance indicators
linked with SSMP elements, but additional
improvements should be implemented (see
below)
ix(c) Assess preventative maintenance program Yes -
ix(d) Update elements based on evaluations Yes -
ix(e) Identify and illustrate SSO trends Yes -

5.9.2 Effectiveness of SSMP Elements and Recommended Modifications Utility Metrics to Prioritize SSMP Activities (SSMP 9.2) • Level of Effectiveness: The WWC tracks four categories of utility metrics to monitor and measure the effectiveness of the various elements of this SSMP, which include system information, financial information, sewer maintenance, and performance measures. The city also tracks various performance measures related to various SSMP elements and they are summarized in Appendix 7.4. Appendix I has effectively been used to identify and track the specific metrics each of the City’s four categories. • Recommendations: No modifications recommended at this time.

Metrics to Monitor Effectiveness of SSMP (SSMP 9.3)
• Level of Effectiveness: The utility metrics listed in Appendix I-4 pertain to different overseeing departments within the City, and the coordination between these different Departments in measuring/monitoring various metrics and sharing results has been effective in ensuring the SSMP goals have been met.
• Recommendations:

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 32
o Incorporate system and financial measures recommended in Table 18, from Appendix I-2 into Appendix I-4 and discard Appendix I-2 from the SSMP.
o Update Appendix I-4 and modify it to include document location and review frequency. o Modify I-4 – Key Performance Indicators (KPI) FOG section, to reflect the change in responsibilities from IWS to WWC.

Metrics to Assess Preventative Maintenance Program (SSMP 9.4) • Level of Effectiveness: The City’s current utility metrics Appendix I defines the frequency and type of utility metric that is being tracked to measure SSMP effectiveness. This is effective because it allows the city to monitor performance of particular activities and compare against SSO trends to determined data correlations. These metrics do not all have associated goals or targets, however, which makes it hard to track whether the activity is meeting the intended result. • Recommendations: Consider addition of recommended PM measures in Table 18, from Appendix I-2 into Appendix I-4 and discard Appendix I-2 from the SSMP. The goal is to produce a single living KPI document that can be used to evaluate the effectiveness of SSMP elements.

SSMP Performance Monitoring and Update Process (SSMP 9.5) • Level of Effectiveness: Individual staff oversee various SSMP element performance indicators. The City tracks all revisions/updates with the SSMP using a revision log that is maintained by the LRO. The log is effective documenting changes to the SSMP and encourages the use of the SSMP as a living document. • Recommendations: No modifications recommended at this time.

SSO Trends – Frequency, Location and Volume (SSMP 9.6)
• Level of Effectiveness: The City tracks a comprehensive list of performance metrics that are included in Appendix I-4 of the SSMP and summarized in Table 19. This allows the City to quickly identify and respond to changing trends in SSOs over time. These metrics are monitored on a monthly, quarterly, semi-annual, and annual basis.
• Recommendations:
o Update Appendix I-3 – SSO History (last update 2013). o Update SSO trends data in Appendix I-4 – KPI Benchmarking. o Consider addition of recommended SSO measures in Table 18, from Appendix I-2 into Appendix I-4 and discard Appendix I-2 from the SSMP. The goal is to produce a single living KPI document that can be used to evaluate the effectiveness of SSMP elements.

Table 18 –Recommended Additional Performance Indicators Description Performance Indicator Unit
System Information Total System Length miles
Service Area sq. miles
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 33
Population people
# maintenance Holes MHs
# Pump Stations PS/ Lift Station number
Sewer < 8 inch miles
8 inches < sewer < 15 inches miles
15 inches < sewer < 21 inches miles
21 inches < sewer < 42 inches miles
Average age of system years
New sewer main installation miles
New sewer lateral installation miles
WWC Staff number
Financial Information
Total annual division budget $
Total annual O&M budget $
O&M budget of annual %
Lift station O&M cost $
Lift station O&M cost of annual %
Annual capital for sewer rehab $
Sewer monthly rate for residents $
O&M
Certified operators number
O&M field staff number
Average high velocity cleaning per crew per day LF
Total visually inspected per year (not CCTV) miles
SSO Number of SSO calls received number
FOG
Public education outreach budget per year $
Public education outreach budget of annual %
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 34
Table 19 – Current Performance Measures to Monitor SSO Trends Performance Measure Unit Target Source
SSOs - Total number, mains and laterals Number - A, B
SSOs - Total volume, mains and laterals Gal - A, B
SSOs - Total volume recovered Gal - B
SSOs - Total number of wet weather Number - A, B
SSOs - Total volume of wet weather Gal - A, B
SSOs - % of spills caused by FOG (main) % - A, B
SSOs - % of spills caused by roots (main) % - A, B
SSOs - % of spills caused by Vandalism (main) % - A, B
SSOs - caused by LS failures Number - A, B
SSOs - caused by pipe failures Number - A, B
SSOs - % of spill volume caused by FOG (lateral) % - A, B SSOs - % of spill volume caused by roots (lateral) % - A, B SSOs - % of spill volume caused by Vandalism (lateral) % - A, B Customer service requests per year Number - A, B
Sewer odor complaints Number - A, B
Flooding claims per year Number - A, B
Cost of flooding claims per year $ - A, B
SSO – Repeats within two years Number 0 B, C
SSOs - Category 1 Number 0 C, D
SSOs / 100 mi pipe / year - Category 2 Number 2.0 C
SSOs / 100 mi pipe / year - Mainline Number 0.6 C
SSOs / 100 mi pipe / year - Lateral Number 8.0 C
A = SSMP section 9.6
B = SSMP Appendix I
C = WW Collections KPIs
D = Program / Performance Reports
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 35

5.10 SSMP Program Audits

5.10.1 Compliance
Table 20 – Compliance with SSS WDR D.13.x – SSMP Program Audits SSMP Requirement Compliance Deficiencies
x Conduct periodic audits Yes -

5.10.2 Effectiveness of SSMP Elements and Recommended Modifications Audit Procedures, Roles, and Responsibilities (SSMP 10.2) • Level of Effectiveness: The City conducts an internal audit biennially to continually measure the effectiveness of the SSMP primarily through evaluating system metrics, performance measures, and reduce SSOs by improving SSMP procedures to better respond to new SSO trends. In addition, the audit evaluates the City’s compliance with SSMP requirements, particularly the amended MRP requirements that were formalized in September 2013. The City developed an audit form as a template to record information produced during the internal SSMP audits. This form is included in SSMP Appendix J-2. The previous audit identified many areas of improvement which the City responded and acted on. Some of these recommended improvements were excluded from this audit based on discussions with the City that eliminated the need for them. Others are considered standing and should still be implemented by the City. Generally, the internal audits implemented by the City have been effective in improving the SSMP and turning it into a living document that that is current, practical, and useful for the City. • Recommendations:
o The SSMP must be recertified by the City Council. Last Certification was completed 4/7/2014.

Per SSS WDR D.14, the City must have the SSMP updated and re-certified by the governing board (i.e. City Council) every five years.
o Post this SSMP internal audit to the City website.
o Schedule the next internal SSMP audit for July-August of 2023. o Develop a description manual to replace Appendix J-1 and J-2 of the SSMP, to support each KPI element. This manual describes required information for KPI monitoring, including but not limited to:
 Elements definition
 How to fill each KPI items
 Personnel responsible
 Review frequency
SSMP Program Modification/Update Process (SSMP 10.3)
• Level of Effectiveness: The City developed a program for monitoring, reviewing sewer performance metrics and the effectiveness of SSMP elements on a biennial basis. Based on the results of the SSMP audits, the Wastewater Utility Manager is assigned to initiate/direct corrective actions to respond to City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 36
deficiencies and enhancements identified in the audit. As determined in the City’s SSMP revision log, the City has been prompt in responding to audit and continually strives to implement improvements. • Recommendations:
o Update the SSMP change log and add it as an appendix to the SSMP, documenting all changes made to the SSMP since its last certification, indicating when an element was changed/updated and who authorized the change. An example of a change log is shown at Appendix 7.5. This was also recommended during the previous audit but has not been implemented. o Document the submittal process for proposed changes to the SSMP. The process may include the following; identify the individual who maintains the most current version of the SSMP, the steps in which suggested modifications are received (by internal staff or the public), how suggestions are routed to the individual/position responsible for the SSMP element associated with suggested modification, the process for review, and the process for updating the SSMP on the City website and documenting changes. This was also recommended during the previous audit but has not been implemented.

5.11 Communication Program

5.11.1 Compliance
Table 21 – Compliance with SSS WDR D.13.xi – Communications Program SSMP Requirement Compliance Deficiencies
xi(a) Communicate on a regular basis with the public and tributary/satellite systems regarding SSMP Yes -

5.11.2 Effectiveness of SSMP Elements and Recommended Modifications Internal Communication – Staff, Utility Commission, and City Council (SSMP 11.2) • Level of Effectiveness: The WWC has used PowerPoint presentations as a resource to describe the purpose of the SSMP and summarize SSS WDR requirements to the City council and City staff. These presentations are attached to the SSMP website.
• Recommendations:
o As of September 2013, the State Water board amended the MRP of the SSS WDR and the City produced a training PowerPoint to City staff, council, and stakeholders regarding the update.

Attach the PowerPoint to the SSMP website. This was also recommended during the previous audit but has not been implemented.
o Post Appendices K-1 – WWC WDR awareness Program and K-2 – Sanitary sewer regulations/WDR PowerPoint presentations on the website. o Post Appendix K-3 – Two “EU Today” Newsletters Preventing Fog in Pipes and Not Flushing Medication down the Sewer.
o Update Appendix K-3 – Two EU newsletters FOG/medications links.

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 37
Stakeholder Communication – Residential, Commercial and Industrial (SSMP 11.3) • Level of Effectiveness: The City communicates regularly with the public and stakeholders via monthly newsletters entitled “EU Today” that includes items regarding sewer utilities. This newsletter is presented online and through bill inserts. A sample newsletter is included in Appendix K of the SSMP. In addition, the City specifically communicates FOG related items to the community via FOG outreach program over TV ads, flyers, direct mail, and site visits to FSEs. • Recommendations:
o Update and Post SSMP Appendix K-4 – FOG Outreach Program with marketing Plan budget & spending and post it on the website. Consider an additional metric to be used in the KPI that reflects the City’s performance in terms of FOG outreach program. Few additional metrics are recommended in Table 18. This was also recommended during the previous audit but has not been implemented.

Tributary/Satellite Communication (11.4)
• Level of Effectiveness: The City routinely communicates with their satellite partners and has three formal agreements in place that include:
o The joint exercise of power agreement for the SPWA
o The agreement regarding the operation of and use of South Placer Regional Wastewater Facilities
o The funding agreement relating to the South Placer Regional Wastewater Facilities o Agreement Regarding the Operation and Use of Wastewater Services between the Sacramento Area Sewer District (SASD) and the Sacramento Regional County Sanitation District (SRCSD). • Recommendations:
o Add the Agreement Regarding the Operation and Use of Wastewater Services between the Sacramento Area Sewer District (SASD) and the Sacramento Regional County Sanitation District (SRCSD) as an appendix. This was also recommended during the previous audit but has not been implemented.
o Modify SSMP 11.4 to include the Agreement Regarding the Operation and Use of Wastewater Services between the Sacramento Area Sewer District (SASD) and the Sacramento Regional County Sanitation District (SRCSD). This was also recommended during the previous audit but has not been implemented.
o Post Appendix K-5 – Funding agreement related to south placer regional wastewater facilities on the website.

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 38
SECTION 6 Audit Summary
This section summarizes the level of compliance of the SSMP with the SSMP requirements identified in subsection D.13 and he identified deficiencies as described in Section 4.1. Table 22 summarizes the result of this evaluation.

Table 22 – Summary of SSMP Compliance Deficiencies
SSMP Requirement Compliance Deficiencies
vi(f) Program to ensure containment of
SSO to prevent discharge and
minimize adverse impacts on the
environment
No
SSOERP does not meet certain water quality monitoring
requirements of the amended MRP document.

In addition, Table 23 lists a summary of all recommendations for this audit.

Table 23 – Summary of Audit Recommendations
SSMP
Section Recommendation
Suggested
Timeline for
Completion

1.2 Post Appendix A-1 – Roseville’s SSMP Development Plan and Implementation Schedule on the website. Jan 2022

2.1 Modify Appendix B-1: Update City Mayor, Vice Mayor, City Attorney, and City Council positions and add phone numbers (Mayor Krista Berrnasconi, Vice Mayor Bruce Houdesheldt, City Attorney Michelle Sheidenberger, Councilmember Tracy Mendonsa). Update Commissioners and phone numbers: Chair Elaine Webb, Vice Chair James knox, Commissioners: Edward Belski, John Delancy, Richard Demarchi, Einar Maisch. Update Liaisons and phone numbers for EU Director Richard Plecker, and Secretary Pam Walsh.

Update Assistant EU Director Ken Glotzbach, Wastewater Collection Superintendent Dan Prudent, Waste Water Collection Supervisor positions, Principal EU engineer and phone number for Jason Shykowski. Update Administrative Analyst and phone number for Maurice Chaney.

Jan 2022

2.1 Post the following Appendices on the website:
o Appendix B-1 – Personnel Responsible for SSMP Elements o Appendix B-2 – Personnel Responsible for SSO Reporting o Appendix B-3 – Personnel Responsible for Responding to SSOs Weekly Standby Jan 2022

2.3 Modify Figure 2-2 Flowchart: Update the WWC Divisions overflow emergency response plan chain of communication to match existing operations, whereby WWTP and LS staff and SCADA alerts should always call the 24-hour call center instead of WWC service staff.

Jan 2022

2.3 Include Figure 2-2 flowchart as Appendix F to the SSOERP (Appendix F-1) and mention in the text.

Jan 2022

3.2 Post Appendix C-1 – Pretreatment Program Enforcement Response Plan on the website. Jan 2022

3.3 Update the related links for Appendices C-2, C-3, and C-4 for sanitary sewer design and construction. Jan 2022

3.7 Post the following Appendices on the website:
o Appendix C-5 – Joint Exercise of Powers Agreement for the South Placer Wastewater Authority
Jan 2022
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 39
o Appendix C-6 – Agreement Regarding the Operation and Use of the South Placer Regional Wastewater Facilities
o Appendix C-7 – Wastewater Service Agreement by Contract and Operating Agreement between SASD, SRCSD and City of Roseville

4.2 Post the following Appendices on the website:
o Post Appendix D-1 – City of Roseville Sewer Map Grid System on the website. o Post Appendix D-9 – Mapping Update Policy on the website.

Jan 2022

4.3 Update SSMP Section 4.3 Overview with updated statistics about the City’s service area, number of customers, miles of main, number of services, and number of lift stations. Also update the number of WWC employees.

Jan 2022

4.3 Update the following Appendices and post on the website:
o Appendix D-2 – Maintenance Cleaning Schedule: Update with Maximo CCMS example
o Appendix D-3 – CCTV Video Report
o Appendix D-4 – SOP
Jan 2022

4.4 Describe the process/procedure for evaluating available data (i.e., CCTV, CMMS, GIS, capacity assessment, visual inspections, etc.), conducting a risk assessment to determine the assets to be renewed, and developing the R&R plan with its associated data. This was also included during the previous audit but has not been completed.

Jan 2022

4.4 Document the upcoming transition in responsibilities between WWC and EU Engineering in developing and operating the R&R plan by describing it in the SSMP. Confirm that field observations from WWC field crew are accounted for by EU Engineering when conducting risk assessment. This was also included during the previous audit but has not been completed.

Jan 2022

4.4 Post Appendix D-8 – Technical Memorandum O&M Program SSMP Audit-Rehabilitation and Replacement Plan (Element IVC) on the website. Jan 2022

4.5 Update the following links:
o The CWEA website link.
o Appendix D-5 – CWEA Certification Handbook link.

Jan 2022

4.6 Update and post the following Appendices on the website:
o Appendix D-6 – Equipment Inventory List
o Appendix D-7 – Critical Replace Parts List
Jan 2022

5.2 Update Appendix E-1 – Sanitary Sewer Design link. Jan 2022

5.3 Update Appendix E-2 – Sanitary Sewer System Construction link. Jan 2022

5.3 Post Appendix E-3 – Technical Memo, SSMP Preparedness Audit Design and Performance Provisions Element V on the website. Jan 2022

6.3 The WWC has developed a table of information specific to lift station response which includes all of the lift stations in the City and lists for each station; the average flow from the station, the wet well depth, the volume of the wet well, the available storage/downtime if the lift station goes down, the point at which a SSO will first occur if the lift station goes down, the assigned manhole for decanting if vacuum trucks are used to draw down the wet well, and the street location of the decant manhole. This information should be included as an Appendix in the OERP and the information for each lift station should be posted onsite at each respective lift station. This list should also be updated to incorporate new lift stations at Washington Blvd and 7600 Sierra College. This was also recommended during the previous audit but has not been implemented.

Jan 2022

6.3 Modify Figure 6-2 – SSO Procedure Flow Chat, to report SSO category 1 larger than 1,000 gallons to Cal OES within 2 hours per WDR requirements (currently if > 50,000 gal). Jan 2022

6.3 Post Appendix F-1 – SSOERP on the website along with corresponding attachments Jan 2022

6.7 Modify SSOERP Appendix C – Water Quality Sampling Procedures to the meet the requirements of the amended MRP. Jan 2022
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 40
o Account for spill travel time in the surface water and scenarios where monitoring may not be possible to safety concerns or access restrictions once an SSO has stopped. This may be estimated by dropping floatable debris, for instance, and measuring the time required to travel a certain distance. This was also recommended during the previous audit but has not been implemented. o Expand minimum sampling parameters to include appropriate bacterial indicators that have been specifically listed in the beneficial uses of the City’s waterways or more broadly listed by the regional Basin Plan. This was also recommended during the previous audit but has not been implemented.

6.7 Modify SSOERP Appendix C – Water Quality Sampling Procedures to include a list of all of the required equipment that the employee would need to conduct proper sampling. This was also recommended during the previous audit but has not been implemented.

Jan 2022

7.8 Modify the EU Engineering GIS database to include hotspot assets and FSEs and add them as layers to the maps that WWC receives. Jan 2022

8.2 Modify Appendix I-1 of the SSMP to indicate that the system evaluation and capacity assurance plan will be reviewed and updated every 10 years. This was also recommended during the previous audit but has not been implemented.

Jan 2022

9.3 Incorporate system and financial measures recommended in Table 18, from Appendix I-2 into Appendix I-4 and discard Appendix I-2 from the SSMP. Jan 2022

9.3 Update Appendix I-4 and modify it to include document location and review frequency. Jan 2022

9.3 Modify I-4 – Key Performance Indicators (KPI) FOG section, to reflect the change in responsibilities from IWS to WWC. Jan 2022

9.4 Consider addition of recommended PM measures in Table 18, from Appendix I-2 into Appendix I-4 and discard Appendix I-2 from the SSMP. The goal is to produce a single living KPI document that can be used to evaluate the effectiveness of SSMP elements.

Jan 2022

9.6 Update Appendix I-3 – SSO History (last update 2013). Jan 2022

9.6 Update SSO trends data in Appendix I-4 – KPI Benchmarking. Jan 2022

9.6 Consider addition of recommended SSO measures in Table 18, from Appendix I-2 into Appendix I-4 and discard Appendix I-2 from the SSMP. The goal is to produce a single living KPI document that can be used to evaluate the effectiveness of SSMP elements.

Jan 2022

10.2 The SSMP must be recertified by the City Council. Last Certification was completed 4/7/2014.

Per SSS WDR D.14, the City must have the SSMP updated and re-certified by the governing board (i.e. City Council) every five years.

Jan 2022

10.2 Post this SSMP internal audit to the City website. Jan 2022

10.2 Schedule the next internal SSMP audit for July-August of 2023. Jan 2022

10.2 Develop a description manual to replace Appendix J-1 and J-2 of the SSMP, to support each KPI element. This manual describes required information for KPI monitoring, including but not limited to:
o Elements definition
o How to fill each KPI items
o Personnel responsible
o Review frequency
Jan 2022

10.3 Update the SSMP change log and add it as an appendix to the SSMP, documenting all changes made to the SSMP since its last certification, indicating when an element was changed/updated and who authorized the change. An example of a change log is shown at Appendix 7.5. This was also recommended during the previous audit but has not been implemented.

Jan 2022

10.3 Document the submittal process for proposed changes to the SSMP. The process may include the following; identify the individual who maintains the most current version of the SSMP, the steps in which suggested modifications are received (by internal staff or the public), how Jan 2022
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 41
suggestions are routed to the individual/position responsible for the SSMP element associated with suggested modification, the process for review, and the process for updating the SSMP on the City website and documenting changes. This was also recommended during the previous audit but has not been implemented.

11.2 As of September 2013, the State Water board amended the MRP of the SSS WDR and the City produced a training PowerPoint to City staff, council, and stakeholders regarding the update.

Attach the PowerPoint to the SSMP website. This was also recommended during the previous audit but has not been implemented.

Jan 2022

11.2 Post Appendices K-1 – WWC WDR awareness Program and K-2 – Sanitary sewer regulations/WDR PowerPoint presentations on the website. Jan 2022

11.2 Update Appendix K-3 – Two EU newsletters FOG/medications links. Jan 2022

11.3 Update SSMP Appendix K-4 – FOG Outreach Program with marketing Plan budget & spending and post it on the website. Consider an additional metric to be used in the KPI that reflects the City’s performance in terms of FOG outreach program. Few additional metrics are recommended in Table 18. This was also recommended during the previous audit but has not been implemented.

Jan 2022

11.4 Add the Agreement Regarding the Operation and Use of Wastewater Services between the Sacramento Area Sewer District (SASD) and the Sacramento Regional County Sanitation District (SRCSD) as an appendix. This was also recommended during the previous audit but has not been implemented.

Jan 2022

11.4 Modify SSMP 11.4 to include the Agreement Regarding the Operation and Use of Wastewater Services between the Sacramento Area Sewer District (SASD) and the Sacramento Regional County Sanitation District (SRCSD). This was also recommended during the previous audit but has not been implemented.

Jan 2022

11.4 Post Appendix K-5 – Funding agreement related to south placer regional wastewater facilities on the website. Jan 2022
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
October 21 Page 42
SECTION 7 Appendices

7.1 Appendix – Historical SSO Data

7.2 Appendix – SSO Data Comparison Charts

7.3 Appendix – Structural SSO GIS Mapping

7.4 Appendix – Key Performance Indicators

7.5 Appendix – Change Log Example
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
A

7.1 Appendix – Historical SSO Data
Dated: FY 18/19, FY 19/20, and FY 20/21
Appendix 7.1 – Historical SSO Data for FY 18/19 to FY 20/21 # Event ID Date of SSO Address Spill Type Spill Volume [gal] Spill Recovered [gal] Spill Recovery [%] Spill Cause Location 1 850146 7/30/2018 276 Spyglass Hill Category 3 105 105 100% Debris-Rags LL 2 850517 8/8/2018 196 South Lincoln Category 3 1 1 100% Roots LL 3 850609 8/9/2018 117 Meadowgate Drive Category 3 26 0 0% Roots LL 4 850709 8/12/2018 117 Ash St Category 3 13 3 23% Roots LL 5 851063 8/28/2018 300 Yosemite Category 3 409 0 0% Roots LL 6 850868 8/28/2018 601 Douglas Blvd Category 3 28 25 89% Roots LL 7 851163 9/9/2018 1201 Meadow Ln Category 3 16 1 6% Roots LL 8 851297 9/19/2018 312 Folsom Category 3 2 2 100% Roots Main 9 852004 10/4/2018 400 Elefa St Category 3 17 15 88% Roots LL 10 852225 10/25/2018 9117 Moondancer Cir Category 3 19 13 68% Roots LL 11 855199 12/21/2018 1331 Champagne Cir Category 3 33 0 0% Roots LL 12 855472 12/23/2018 100 Alta Vista Category 3 10 10 100% Grease Main 13 855930 1/12/2019 240 Duranta Category 3 1 1 100% Roots LL 14 855675 1/15/2019 1211 Ross CT Category 3 29 25 86% Debris-Rags LL 15 855986 1/20/2019 1018 Melrose Ave Category 3 2 2 100% Pipe/Structure Failure LL 16 856355 1/28/2019 1040 Shenencock Way Category 3 15 14 93% Roots LL 17 856617 2/4/2019 314 Folsom Category 3 15 14 93% Debris-Rags LL 18 856801 2/6/2019 312 Folsom Category 3 3 2 67% Debris-Rags Main 19 856820 2/19/2019 236 Elm St Category 3 3 1 33% Pipe/Structure Failure LL 20 856798 2/24/2019 712 Hillcrest Category 3 9 7 78% Roots LL 21 857431 3/18/2019 1044 Magnolia Way Category 3 20 19 95% Roots LL 22 857531 3/30/2019 301 Coronado Category 3 5 5 100% Roots LL 23 858014 4/12/2019 311 Circuit Category 3 3 0 0% Roots LL 24 858150 4/19/2019 801 Vernon St Category 3 15 12 80% Debris-Rags LL 25 858533 5/2/2019 2551 La Croix Dr Category 3 6 4 67% Debris-Rags LL 26 858177 5/4/2019 276 SpyGlass Hill Category 3 5 3 60% Debris-Rags LL 27 859382 5/12/2019 1121 Champion Oaks Category 3 20 15 75% Roots LL 28 858540 5/14/2019 801 Vernon St Category 3 4 3 75% Debris-Rags LL 29 858670 5/20/2019 146 Elm St Category 3 22 13 59% Roots LL 30 858673 5/24/2019 130 Donner Ave Category 3 11 10 91% Roots LL 31 860089 6/23/2019 348 B St Category 3 2 2 100% Roots LL 32 861344 8/6/2019 312 Evelyn Ct Category 3 3 0 0% Roots LL 33 861387 8/19/2019 233 D St Category 3 18 8 44% Roots LL 34 861459 8/22/2019 1012 Audrey Way Category 3 5 2 40% Roots LL 35 861492 9/2/2019 110 Zola Ave Category 3 3 2 67% Roots LL 36 861672 9/14/2019 1420 Spring Valley Dr Category 3 2 2 100% Roots LL 37 862432 9/15/2019 73 Bernice Ave Category 3 9 8 89% Roots LL 38 862480 9/26/2019 300 Main St Category 3 3 2 67% Debris-Rags LL 39 863062 10/8/2019 421 Pleasant St Category 3 5 0 0% Pipe/Structure Failure LL 40 863198 10/16/2019 1008 Shearer st Category 3 1 1 100% Roots LL 41 863091 10/21/2019 100 Atkinson St Category 3 16 12 75% Debris-Rags LL 42 863728 11/9/2019 137 Cedar St Category 3 8 6 75% Roots LL 43 863690 11/11/2019 921 Herbert St Category 3 11 6 55% Roots LL 44 863729 11/20/2019 131 Elm St Category 3 9 3 33% Pipe/Structure Failure LL 45 863634 11/23/2019 520 B St Category 3 77 74 96% Debris-Rags LL 46 863785 12/3/2019 1005 Circuit Dr Category 3 11 10 91% Roots LL 47 863909 12/13/2019 276 Spyglass Hill Category 3 5 3 60% Debris-Rags LL 48 863802 12/15/2019 301 Bitner St Category 3 33 31 94% Roots LL 49 863888 12/16/2019 501 Brookwood Dr Category 3 20 19 95% Roots LL 50 864408 12/17/2019 1033 Portside Cir. Category 3 9 8 89% Debris-Rags LL 51 864470 12/17/2019 1896 Ambridge Dr Category 3 4 3 75% Pipe/Structure Failure LL 52 863893 12/27/2019 1940 Inglis Wy. Category 3 13 12 92% Roots LL 53 864668 1/16/2020 910 Carol Ann Ct. Category 3 20 19 95% Roots Main 54 864878 1/18/2020 2012 Cirby Way Category 3 3 3 100% Roots LL 55 865188 1/20/2020 197 Donner Category 3 2 1 50% Debris-Other LL 56 864796 1/28/2020 603 Rigby Ct Category 3 40 38 95% Debris-Rags LL 57 865414 2/11/2020 1080 Douglas Blvd Category 3 2 1 50% Roots LL 58 865218 2/23/2020 530 Loretto Dr Category 3 1 0 0% Roots LL 59 865833 2/25/2020 640 Elefa St Category 3 3 1 33% Debris-Rags LL 60 866387 3/22/2020 276 Spyglass Hill Category 3 5 5 100% Debris-Rags LL 61 867100 4/14/2020 311 Manzanita Category 3 16 14 88% Debris-Rags Main 62 866491 4/19/2020 1335 Chignahuapan Way Category 3 9 9 100% Debris-Rags LL 63 866906 5/9/2020 400 Automall Dr Category 3 154 139 90% Contractor Cause Main 64* 867987 6/21/2020 401 Coronado Category 3 60 35 58% Debris-Rags Main 65 868910 9/5/2020 1600 Russel Way Category 3 10 9 90% Roots LL 66 868986 9/13/2020 625 Windsor Category 3 10 9 90% Roots LL 67 869306 9/15/2020 4100 Shorthorn Way Category 3 89.2 32 36% Debris-Rags LL 68 869422 9/22/2020 1600 Kit Carson Way Category 3 17 16 94% Roots LL 69 869983 10/11/2020 710 Vine Ave Category 3 10 9 90% Pipe/Structure Failure LL 70 869767 10/11/2020 2006 Poliey Dr Category 3 5 4 80% Roots LL 71 870006 10/22/2020 305 Union St Category 3 1.5 0.28 19% Roots LL 72 870345 10/28/2020 2207 Lee Way Category 3 6 4 67% Roots LL 73 870728 11/4/2020 420 Winfield Ct Category 3 30 29 97% Roots LL 74 870959 11/11/2020 101 Sharon Way Category 3 2 2 100% Roots LL 75 871000 11/24/2020 1559 Mistywood Dr Category 3 55 0 0% Roots LL 76 871051 11/27/2020 1011 Oakland Ave Category 3 64 44 69% Pipe/Structure Failure LL 77 871442 12/9/2020 609 Windsor Dr Category 3 44 43 98% Pipe/Structure Failure Main 78 871608 12/14/2020 105 Half D St Category 3 48 44 92% Roots LL 79 872084 12/22/2020 333 Atkinson St Category 3 17 1 6% Roots LL 80 871663 12/26/2020 406 Berkeley Category 3 2 0 0% Roots LL 81 871531 1/3/2021 538 Loretto Ave Category 3 5 1 20% Roots LL 82 872200 1/5/2021 330 Circuit Dr Category 3 5 1 20% Pipe/Structure Failure LL 83 872110 1/9/2021 1729 Tanglewood Category 3 33 30 91% Roots Main 84 871602 1/10/2021 628 Main St Category 3 49 46 94% Roots LL 85 872277 1/25/2021 420 Circuit Dr Category 3 5 2 40% Roots LL 86 872331 2/4/2021 213.5 Irene Category 3 2 1 50% Pipe/Structure Failure LL 87 872405 2/4/2021 221 Church St Category 3 2 1 50% Roots LL 88 872635 2/8/2021 1326 Chignahuapan Way Category 3 2 2 100% Debris-Rags LL 89 872485 2/9/2021 805 Clina Way Category 3 17 15 88% Debris-Rags LL 90 873130 2/14/2021 1011 Circuit Dr Category 3 46 41 89% Roots LL 91 873014 2/16/2021 209 Elm St Category 3 19 0 0% Pipe/Structure Failure LL 92 872794 2/16/2021 224 Diamond Oaks Rd Category 3 15 15 100% Pipe/Structure Failure LL 93 872482 2/18/2021 510 Highland Ave Category 3 2 0 0% Roots LL 94 872632 2/26/2021 1467 West Colonial Pkwy Category 3 2 1 50% Pipe/Structure Failure LL 95 872728 3/1/2021 329 Berkeley Ave Category 3 9 8 89% Pipe/Structure Failure LL 96 872928 3/4/2021 115 Alta Vista Ave Category 3 2 1 50% Pipe/Structure Failure LL 97 872853 3/9/20121 701 Lincoln St Category 3 23 22 96% Roots LL 98 873302 3/11/2021 543 Alta Vista Ave Category 3 31 25 81% Roots LL 99 873405 3/16/2021 406 Earl Category 3 11 9 82% Pipe/Structure Failure LL 100 873615 3/24/2021 824 Atlantic St Category 3 18 14 78% Pipe/Structure Failure LL 101 873317 3/27/2021 69 Bernice Ave Category 3 1 0 0% Roots LL 102 873318 3/28/2021 206 Irene Ave Category 3 3 3 100% Roots LL 103 873529 3/31/2021 100 Atkinson St Category 3 20 2 10% Pipe/Structure Failure LL 104 873738 4/5/2021 243 Irene Ave Category 3 1 0 0% Contractor Cause LL 105 873705 4/6/2021 2029 Polley Dr Category 3 19 0 0% Roots LL 106 874120 4/12/2021 521 Main St Category 3 2 1 50% Roots LL 107 873979 4/19/2021 1105 Muir Ct Category 3 6 5 83% Roots LL 108 874115 4/21/2021 252 Elm St Category 3 4 0 0% Roots LL 109 874206 4/28/2021 702 Vinewood Category 3 12 3 25% Roots LL 110 873975 5/1/2021 1215 Sheffield Way Category 3 2 1 50% Roots LL 111 873970 5/4/2021 1610 Old Hart Ranch Rd Category 3 28 25 89% Roots LL 112 874471 5/17/2021 213 Half Irene Ave Category 3 5 1 20% Roots LL 113 874814 5/30/2021 312 Earl Ave Category 3 7 1 14% Roots LL 114 875444 6/28/2021 307 Brentwood Rd Category 3 5 1 20% Roots LL NOTES:
*Spill Report was entered in California Integrated Water Quality System Project (CIWQS). However City Spill Report was lost during Transition.

City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
B

7.2 Appendix – SSO Data Comparison Charts
Duration Response
EVENT ID CIWQS City CIWQS City CIWQS City CIWQS City >3 hr >40 min CIWQS City Notes 1 850146 105 105 105 105 0.156944 0.156944 0.006944 0.006944 1 0 Pipe Structural Problem/Failure Debris-Rags 2 850517 1 1 1 1 0.033333 0.033333 0.017361 0.017361 0 0 Root Intrusion Roots 3 850609 26 26 0 0 0.189583 0.189583 0.013889 0.013889 1 0 Root Intrusion Roots 4 850709 13 13 3 3 0.004167 0.004167 0.029167 0.029167 0 1 Pipe Structural Problem/Failure Roots 5 850868 28 28 25 25 0.765972 0.765972 0.006944 0.006944 1 0 Root Intrusion Roots 6 851063 409 409 0 0 2.180556 2.180556 0.011111 0.011111 1 0 Root Intrusion Roots 7 851163 16 16 1 1 0.046528 0.046528 0.03125 0.03125 0 1 Pipe Structural Problem/Failure - Installation Roots 8 851297 2 2 2 2 0.001389 0.001389 0 0.019444 0 0 Pipe Structural Problem/Failure Roots Incorrect Agency Notification time in CIWQS 9 852004 17 17 15 15 0.024306 0.024306 0.009028 0.009028 0 0 Root Intrusion Roots 10 852225 19 19 13 13 0.051389 0.051389 0.009028 0.009028 0 0 Root Intrusion Roots 11 855199 33 33 0 0 0.083333 0.083333 0.013889 0.013889 0 0 Root Intrusion Roots 12 855472 10 10 10 10 0.0625 0.0625 0.009722 0.009722 0 0 Grease Deposition (FOG) Grease 13 855675 29 29 25 25 0.072917 0.072917 0.006944 0.006944 0 0 Debris-Wipes/Non-Dispersables Debris-Rags 14 855930 1 1 1 1 0.007639 0.007639 0.006944 0.006944 0 0 Root Intrusion Roots 15 855986 2 2 2 2 0.030556 0.030556 0.013194 0.013194 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 16 856355 15 15 14 14 0.115278 0.115278 0.009722 0.009722 0 0 Root Intrusion Roots 17 856617 15 15 14 14 0.035417 0.035417 0.021528 0.021528 0 0 Debris-Wipes/Non-Dispersables Debris-Rags 18 856798 9 9 7 7 0.047222 0.047222 0.027778 0.027778 0 0 Root Intrusion Roots 19 856801 3 3 2 2 0.027083 0.027083 0.00625 0.00625 0 0 Pipe Structural Problem/Failure Debris-Rags 20 856820 3 3 1 1 0.045833 0.058333 0 0.0125 0 0 Pipe Structural Problem/Failure - Installation Pipe/Structure Failure Incorrect Operator Arrival time and SSO End time in CIWQS 21 857431 20 20 19 19 0.549306 0.549306 0.01875 0.01875 1 0 Root Intrusion Roots 22 857531 5 5 5 5 0.038889 0.049306 0.013889 0.013889 0 0 Root Intrusion Roots Incorrect SSO Start time in CIWQS 23 858014 3 3 0 0 0.217361 0.217361 0.018056 0.018056 1 0 Root Intrusion Roots 24 858150 15 15 12 12 0.0375 0.0375 0.009722 0.009722 0 0 Debris from Construction Debris-Rags 25 858177 5 5 3 3 0.050694 0.050694 0.020833 0.020833 0 0 Debris-Rags Debris-Rags 26 858533 6 6 4 4 0.044444 0.044444 0.023611 0.023611 0 0 Debris-Wipes/Non-Dispersables Debris-Rags 27 858540 4 4 3 3 0.036111 0.036111 0.011806 0.011806 0 0 Debris-Wipes/Non-Dispersables Debris-Rags 28 858670 22 22 13 13 0.05625 0.05625 0.004861 0.004861 0 0 Root Intrusion Roots 29 858673 11 11 10 10 0.041667 0.041667 0.0125 0.0125 0 0 Root Intrusion Roots 30 859382 20 20 15 15 0.054167 0.054167 0.019444 0.019444 0 0 Root Intrusion Roots 31 860089 2 2 2 2 0.0375 0.0375 0.017361 0.015972 0 0 Root Intrusion Roots Incorrect Agency Notification time in CIWQS Total 869 869 327 327 5.145833 5.16875 0.421528 0.452083 6 2 38% 38%
31 Avg 3:59:02 4:00:06 0:19:35 0:21:00
Cause
2018/2019 SSO Data Comparison
Spill Volume Rec Volume SSO Duration Response Time
Duration Response
EVENT ID CIWQS City CIWQS City CIWQS City CIWQS City >3 hr >40 min CIWQS City Notes 1 861344 3 3 0 0 0.68125 0.68125 0.021528 0.011111 1 0 Root Intrusion Roots Incorrect Agency notification time in CIWQS 2 861387 18 18 8 8 0.041667 0.041667 0.013889 0.013889 0 0 Root Intrusion Roots 3 861459 5 5 2 2 0.021528 0.021528 0.014583 0.014583 0 0 Root Intrusion Roots 4 861492 3 3 2 2 0.109028 0.109028 0.031944 0.031944 0 1 Pipe Structural Problem/Failure Roots 5 861672 2 2 2 2 0.000694 0.000694 0 0.011111 0 0 CS Mainentance Caused Spill/Damage Roots Incorrect Agency notification time in CIWQS 6 862432 9 9 8 8 0.034028 0.034028 0.023611 0.023611 0 0 Root Intrusion Roots 7 862480 3 3 2 2 0.036111 0.036111 0.025694 0.025694 0 0 Debris-Rags Debris-Rags 8 863062 5 5 0 0 0.533333 0.533333 0.016667 0.016667 1 0 Pipe Structural Problem/Failure Pipe/Structure Failure 9 863091 16 16 12 12 0.038194 0.038194 0.027778 0.027778 0 0 Debris-Rags Debris-Rags 10 863198 1 1 1 1 0.022222 0.022222 0.011806 0.011806 0 0 Root Intrusion Roots 11 863634 77 77 74 74 0.043056 0.043056 0.011806 0.011806 0 0 Debris-Rags Debris-Rags 12 863690 13 11 6 6 0.027778 0.027778 0.017361 0.017361 0 0 Root Intrusion Roots 13 863728 8 8 6 6 0.040278 0.04375 0.028472 0.028472 0 1 Root Intrusion Roots Incorrect SSO Start time in CIWQS- off by 5 mins 14 863729 9 9 3 3 0.601389 0.601389 0.007639 0.007639 1 0 Pipe Structural Problem/Failure Pipe/Structure Failure 15 863785 11 11 10 10 0.029167 0.029167 0.009722 0.009722 0 0 Root Intrusion Roots 16 863802 33 33 31 31 0.039583 0.039583 0.008333 0.008333 0 0 Root Intrusion Roots 17 863888 20 20 19 19 0.032639 0.032639 0.011806 0.011806 0 0 Root Intrusion Roots 18 863893 13 13 12 12 0.015972 0.015972 0.005556 0.005556 0 0 Root Intrusion Roots 19 863909 3 5 1 3 0.020139 0.020139 0.009722 0.009722 0 0 Debris-Rags Debris-Rags 20 864408 9 9 8 8 0.011806 0.011806 0.013889 0.013889 0 0 Debris-Rags Debris-Rags 21 864470 4 4 3 3 0.0375 0.0375 0.022222 0.022222 0 0 Root Intrusion Pipe/Structure Failure 22 864668 20 20 19 19 0.006944 0.006944 0.008333 0.008333 0 0 Root Intrusion Roots 23 864796 40 40 38 38 1.020833 0.020833 0.008333 0.008333 0 0 Debris-Wipes/Non-Dispersables Debris-Rags 24 864878 3 3 3 3 0.010417 0.010417 0.01875 0.01875 0 0 Root Intrusion Roots 25 865188 2 2 1 1 0.006944 0.006944 0.017361 0.017361 0 0 Pipe Structural Problem/Failure Debris-Other 26 865218 1 1 0 0 0.020833 -0.01181 0.016667 0.016667 0 0 Root Intrusion Roots SSO End Time on City Spill Report does not make sense. 27 865414 2 2 1 1 0.034722 0.034722 0.013889 0.013889 0 0 Root Intrusion Roots 28 865833 3 3 1 1 0.073611 0.073611 0 0 0 0 Debris-Wipes/Non-Dispersables Debris-Rags Notification time and Arrival time occurred at the same time.

This a a operator noticed spill.
29 866387 5 5 5 5 0.040278 0.040278 0.029861 0.029861 0 1 Debris-Wipes/Non-Dispersables Debris-Rags 30 866491 9 9 9 9 0.832639 0.832639 0.005556 0.005556 1 0 Debris-Rags Debris-Rags 31 866906 154 154 149 139 0.106944 0.106944 0.015972 0.015972 0 0 Damage by Others Not Related to CS
Construction/Maintenance (Specify Below) Contractor Cause 32 867100 16 16 14 14 0.039583 0.039583 0.015972 0.015972 0 0 Debris-Rags Debris-Rags 33 867987 60 0 35 0 1.704861 0 0.034722 0 0 0 Debris-Rags Debris-Rags CIty spill report is missing no way to compare info Total 580 520 485 442 6.315972 2.465972 0.519444 0.485417 4 3 84% 85%
33 Avg 4:35:36 1:47:36 0:22:40 0:21:11
Cause
2019/2020 SSO Data Comparison
Spill Volume Rec Volume SSO Duration Response Time
Duration Response
EVENT ID CIWQS City CIWQS City CIWQS City CIWQS City >3 hr >40 min CIWQS City Notes 1 868910 10 10 9 9 0.020833 0.020833 0.010417 0.010417 0 0 Root Intrusion Roots 2 868986 10 10 9 9 0 0.025694 0.015278 0.015278 0 0 Root Intrusion Roots Incorrect Spill End Date was entered in CIWQS. Should be 9/13, but 9/3 was entered. Time was correct.
3 869306 90 89.2 32 32 0.600694 0.600694 0.015278 0.015278 1 0 Debris-Wipes/Non-Dispersables Debris-Rags Incorrect Spill Volume Reported to CIWQS. 4 869422 17 17 16 16 0.029167 0.029167 0.01875 0.01875 0 0 Root Intrusion Roots 5 869767 5 5 4 4 0.025 0.025 0.014583 0.014583 0 0 Root Intrusion Roots 6 869983 10 10 9 9 0.021528 0.021528 0.011111 0.011111 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 7 870006 2 1.5 0 0.28 3.945833 3.945833 0.009028 0.009028 1 0 Root Intrusion Roots Incorrect Spill Volume and Recovered Volume Reported to CIWQS 8 870345 6 6 4 4 0.028472 0.028472 0.018056 0.018056 0 0 Root Intrusion Roots 9 870728 30 30 29 29 0.015278 0.015278 0.013194 0.013194 0 0 Root Intrusion Roots 10 870959 2 2 2 2 0.020139 0.020139 0.008333 0.008333 0 0 Root Intrusion Roots 11 871000 55 55 0 0 0.664583 0.664583 0.00625 0.00625 1 0 Root Intrusion Roots 12 871051 64 64 44 44 1.996528 1.996528 0.001389 0.001389 1 0 Pipe Structural Problem/Failure Pipe/Structure Failure 13 871442 44 44 43 43 0.03125 0.03125 0.007639 0.007639 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 14 871531 5 5 1 1 0.032639 0 0.022222 0.022222 0 0 Root Intrusion Roots Incorrect End Spill time entered in CIWQS. Spill was not active upon arrival. 15 871602 49 49 46 46 0.329861 0.329861 0.009028 0.009028 1 0 Root Intrusion Roots 16 871608 48 48 44 44 0.041667 0.041667 0.00625 0.00625 0 0 Root Intrusion Roots 17 871663 2 2 0 0 0.020833 0 0.016667 0.017361 0 0 Root Intrusion Roots Incorrect Agency Notification time in CIWQS. No SSO end time in City report or Narrative. Unknown when Spill ended.
18 872084 17 17 1 1 0.041667 0.041667 0.007639 0.004861 0 0 Root Intrusion Roots Incorrect Agency Notification time in CIWQS 19 872110 33 33 30 30 0.15625 0.15625 0.006944 0.006944 1 0 Root Intrusion Roots 20 872200 5 5 1 1 0.0375 0.0375 0.004167 0.004167 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 21 872277 5 5 2 2 0.052778 0.020833 0.010417 0.010417 0 0 Root Intrusion Roots Incorrect End Spill time entered in CIWQS. Spill was not active upon arrival. 22 872331 2 2 1 1 0.056944 0.056944 0.014583 0.014583 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 23 872405 2 2 1 1 0.010417 0.010417 0.011806 0.011806 0 0 Root Intrusion Roots 24 872482 2 2 0 0 0.529861 0.529861 0.013889 0.013889 1 0 Root Intrusion Roots 25 872485 17 17 15 15 0.003472 0.003472 0 0.01875 0 0 Debris from Lateral Debris-Rags Incorrect Agency Notification time in CIWQS 26 872632 2 2 1 1 0.010417 0.010417 0.008333 0.008333 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 27 872635 2 2 2 2 0.071528 0.071528 0.026389 0.026389 0 0 Root Intrusion Debris-Rags 28 872728 9 9 8 8 0.001389 0.001389 0 0.009722 0 0 Debris from Lateral Pipe/Structure Failure Incorrect Agency Notification time in CIWQS 29 872794 15 15 15 15 0.052083 0.054167 0.009722 0.008333 0 0 Root Intrusion Pipe/Structure Failure Incorrect End spill time and Agency notification time in CIWQS 30 872853 23 23 22 22 0.048611 0.048611 0.007639 0.007639 0 0 Root Intrusion Roots 31 872928 2 2 1 1 0.010417 0.010417 0.00625 0.00625 0 0 Root Intrusion Pipe/Structure Failure 32 873014 19 19 0 0 0.0625 0.0625 0.009722 0.009722 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 33 873130 46 46 41 41 0.111806 0.111806 0.025694 0.025694 0 0 Root Intrusion Roots 34 873302 31 31 25 25 2.027083 2.027778 0.004861 0.004861 1 0 Root Intrusion Roots 35 873317 1 1 0 0 0.034028 0.034028 0.023611 0.023611 0 0 Root Intrusion Roots 36 873318 3 3 3 3 0.011806 0.011806 0.020833 0.020833 0 0 Root Intrusion Roots 37 873405 11 11 9 9 0.024306 0.024306 0.013889 0.013889 0 0 Pipe Structural Problem/Failure Pipe/Structure Failure 38 873529 20 20 2 2 0.604167 0.604167 0.009028 0.009028 1 0 Grease Deposition (FOG) Pipe/Structure Failure Cause
2020/2021 SSO Data Comparison
Spill Volume Rec Volume SSO Duration Response Time
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
C

7.3 Appendix – Structural SSO GIS Mapping
22 26
Springview/DC
SMD2
8 24
Sierra College/StrapRav

PG WWTP
North Roseville/PG
2 15
6 19
20 25
1 Highlands
14 21
18 23
16 15A
3 4
5 7
9 5A
10 7A
16A
11 12
17 DC WWTP
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Legend
Age
1 - 10
11 - 20
21 - 30
31 - 50
51 - 80
81 - 110
AVG_RDII
1 - 200
201 - 600
601 - 1000
1001 - 2000
2001 - 2500
2501 - 3000
3001 - 3500
3501 - 4000
4001 - 5000
5001 - 9629
City of Roseville I&I Study - 2018
Existing Conditions
Average RDII [gpd/idm] and Conduit Age [year]
Date: 3/21/2018
1:50,000 ¯
Project#: 17-067
A-10 Age [year]
Ave. RDII [gpd/idm]
DCWWTP
PGWWTP
A 7.3
SStructural Caused SSOs
Structural SSO GIS MAPPING
Overlaid on City of Roseville I&I Study - 2018
Existing Conditions Average RDII[gpd/idm and Conduit Age [year] City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
D

7.4 Appendix – Key Performance Indicators

SSS WDR
Ref. Description Performance Indicator Unit
Target
KPI Data FY 14/15KPI Data FY 15/16KPI Data FY 16/17KPI Data FY 17/18KPI Data FY 18/19KPI Data FY 19/20KPI Data FY 20/21Audit FrequencyResponsible Party Average response to customer inquiry Minute 40 19.58 23 20 21 20 21 21 Quarterly WW Superintendent Total customer service requests Number 0 915 1549 533 302 288 523 325 Quarterly WW Superintendent Total sewer odor complaints Number 0 9 43 50 39 45 10 24 Quarterly WW Superintendent Average rating in customer service card Number 5 5 5 5 5 5 5 5 Quarterly WW Superintendent D.iv.a Maps Average response time to map update requests Days 90 90 90 90 90 90 90 90 Quarterly WW Superintendent Manholes Inspection performed Number 0 2493 3575 1547 1511 149 293 88 Quarterly WW Superintendent Sewer main flushed per year Miles 250 284 248 295 283.12 226.1 235.9 296.14 Quarterly WW Superintendent Sewer laterals mechanically cleaned (eeled) per year Miles 8 14.32 14.77 7.41 1.07 268 235 74 Quarterly WW Superintendent Working staff time to PM program % 80% 85% 82% 82% 84% 84% 83% 84% Quarterly WW Superintendent Number of customer accounts per WW employee Number 561 1517 1554 1772 1757 1943 1873 1873 Quarterly WW Superintendent Average cost of hydro cleaning $/lf $0.36 $0.32 $0.33 $0.29 $0.32 $0.34 $0.34 $0.34 Annually WW Superintendent Average cost of sewer mechanical cleaning $/lf $1.60 $1.20 $0.77 $0.94 $1.66 $0.30 $0.30 $0.30 Annually WW Superintendent Manholes rehabilitated Number 50 0 0 0 0 0 0 0 Quarterly WW Superintendent Sewer main CCTV inspected per year Miles 30 75 84.32 59.71 64.1 119.9 94.65 38.57 Quarterly WW Superintendent Sewer laterals CCTV inspected per year Miles 16 26 35.71 32.51 36.14 29.74 22.46 27.88 Quarterly WW Superintendent Sewer cleanouts installed per year Number 75 76 83 144 141 67 118 58 Quarterly WW Superintendent Sewer Laterals Rehabilitated Number 50 48 60 85 89 74 82 110 Quarterly WW Superintendent Total miles rehabed or replaced per year (main) Miles 5 6 0 0 1.07 0.05 0.09 3.4 Annually EU Engineering Total miles rehabed or replaced per year (lateral) Miles 0.25 0.16 0.27 0.66 0.42 0.45 0.46 0.62 Annually EU Engineering Annual capitol budget sewer rehab/replacement $/M $1.80 $1.05 $1.36 $2.61 $2.25 $2.70 $2.70 $2.10 Annually WW Superintendent Average cost of CCTV main $/lf $0.53 $0.41 $0.41 $0.36 $0.40 $0.60 $0.75 $1.85 Annually WW Superintendent Average cost of CCTV lateral S/lf $1.34 $1.11 $1.15 $1.04 $1.00 $1.24 $1.29 $1.28 Annually WW Superintendent D.iv.d Training On the job accidents Number 0 5 3 3 4 Quarterly EU Safety Coordinator D.iv.e Critical Parts % of required numberof identified critical parts are stocked % 100 100 100 100 100 100 100 100 Annually Materials Technician % of new sewer main accepted vs. inspected % 100 100 100 100 100 100 100 100 Annually WW Supervisor % of new sewer lateral accepted vs. inspected % 100 100 100 100 100 100 100 100 Annually WW Supervisor D.vi.a Notification Average response time to SSO Minutes 40 20 23 20 17 21 22 17 Quarterly WW Superintendent Average SSO duration (main) Minutes 40 n/a 70 0 0 0 154 146 Quarterly WW Superintendent Average SSO duration (lateral) Minutes 40 n/a 37 48 36 171 245 285 Quarterly WW Superintendent D.vii.a Public Education FOG public education outreach program events per year Number 4 3 4 3 3 2 1 1 Annually Environmental Utilities PIO D.vii.b FOG Disposal Gallons of FOG curbside pickup per year Gallons 25 179.75 293.1 373.25 296 506 323 595 Quarterly Refuse Division % of total FSE's with grease removal devices % 90 90 97 98 98 98 98 98 Annually Ind Waste Technician % of total FSE's with a variance % 5 4 4 4 4 4 4 4 Annually Ind Waste Technician FSE FOG inspections per year Number 294 n/a n/a 181 231 N/A N/A 221 Quarterly Ind Waste Technician Number of new FSE permits issued per year Number 5 n/a n/a 40 46 N/A N/A 36 Quarterly Ind Waste Technician % of hotspot pipes CCTV inspected each year % 100% 100% 100% 100% 100% 100% 100% 100% Annually WW Supervisor Number of SSO's caused by hot spots Number 0 0 0 0 0 0 0 0 Quarterly WW Superintendent SSO volume casued by hot spots Gallons 0 0 0 0 0 0 0 0 Quarterly WW Superintendent Total number of SSO's mains and laterals Number 76 42 39 24 25 31 32 51 Quarterly WW Superintendent Total volume SSO's mains and laterals Gallons 2000 1202 2523 1086 1565 869 517 772 Quarterly WW Superintendent % of total SSO volume recovered % 100 94.5 95.42 91.25 53.86 37.63 86.8 63 Quarterly WW Superintendent Total number of wet weather SSO's Number 0 0 0 0 0 0 0 0 Quarterly WW Superintendent Total volume of wet weather SSO's Gallons 0 0 0 0 0 0 0 0 Quarterly WW Superintendent D.ii.c
Chain of
Communication
D.iv.b PM Activities
D.v.a&b Construction
D.iv.c R&R Plan
D.vi.b SSO Response
D.vii.d
D.vii.e
D.vii.f Hot Spots
BMPs &Devices
FOG Inspections
% of SSO's caused by FOG (main) % 1 50 50 0 0 100% 0 0 Quarterly WW Superintendent % of SSO's caused by roots (main) % 70 0 0 0 0 0 0 50% Quarterly WW Superintendent % of SSO's caused by debris/rags (main) % 0 0 0 0 0 0 100% 50% Quarterly WW Superintendent Number of SSO's caused by LS failure Number 0 0 0 0 0 0 0 0 Quarterly WW Superintendent Number of SSO's caused by pipe/structural failures Number 0 0 1 1 3 1 3 14 Quarterly WW Superintendent % of SSO's caused by FOG (laterals) % 10 0 0 0 0 0 0 0 Quarterly WW Superintendent % of SSO's casued by roots (laterals) % 75 77.5 84 87 48 20 16 35 Quarterly WW Superintendent % of SSO's casued by debris/rags (laterals) % 0 12.5 10.8 9 28 9 11 2 Quarterly WW Superintendent Repeats SSO's within two years Number 0
2 0 0 0 4 1 1 Quarterly WW Superintendent
Number of Category 1 SSO's Number 0 0 0 0 1 0 0 0 Quarterly WW Superintendent SSO's/100 miles of pipe/year- Category 2 Number 2 0 1 0 0 0 0 0 Quarterly WW Superintendent SSO's/100 miles of pipe/year - lateral Number 15 16.26 15.04 9.35 8.81 9.56 10.24 16.38 Quarterly WW Superintendent SSO's/100 miles of pipe/year -mains Number 0.6 0.4 0.4 0 0.19 0.52 0.52 0.35 Quarterly WW Superintendent Flooding claims per year Number 0 1 0 0 Quarterly WW Superintendent Total Cost of claims per year $ 0 0 0 Quarterly Risk Management D.ix.e SSO Trends
City of Roseville
Sewer System Management Plan (SSMP)
Biennual Audit of FY 18/19 – FY 20/21
E

7.5 Appendix – Change Log Example
79 3.5 References

3.5.1 SSMP Sample Change Log
{Insert Enrollee Name}
Sewer System Management Plan
Change Log
Date SSMP
Element/
Section
Description of Change/Revision Made Change
Authorized By:

Appendix 10-6
SSPM Audit Fiscal Years 22/23 and 23/24
Sewer System Management Plan (SSMP) Audit
(May 2022 to May 2024)

TABLE OF CONTENTS
1 TABLE OF CONTENTS
............................................................................................................................ 4 ........................................................................................... 16 Element 1 – ................................................................................................................. 16

1.1 Regulatory Context ..................................................................................................................................... 16

1.2 SSMP Update Schedule ............................................................................................................................... 16

1.3 Sewer System Asset Overview....................................................................................................................16 Element 2 – ............................................................................................................................... 19 Element 3 – Legal Authority ............................................................................................................................ 22 Element 4 – ......................................................................................... 25

4.1 Updated Map of Sewer System .................................................................................................................. 25

4.2 ..................................................................................... 25

4.3 Training ....................................................................................................................................................... 25

4.4 Equipment Inventory .................................................................................................................................. 26 Element 5 – ............................................................................................. 29

5.1 Updated ................................................................................ 29

5.2 Procedures and Standards .......................................................................................................................... 29 Element 6 – Spill Emergency Response Plan .................................................................................................... 31 Element 7 – Sewer Pipe Blockage Control Program .........................................................................................35 Element 8 – ....................................................38

8.1. ............................................................................................... 38 Element 9 – ...................................................................... 42 Element 10 – Internal Audits .......................................................................................................................... 44 Element 11 – ........................................................................................................... 47 2 LIST OF APPENDICIES ...................................................................................................................................... 49 APPENDIX 1 –
APPENDIX 2 – City Performance Metrics and Key Performance Indicators (KPIs) APPENDIX 3 – City Spill Performance Benchmark Report
APPENDIX 4 – (2024-2025)
May 2022-May 2024 2 City of Roseville
May 2022-May 2024
May 2022-May 2024 3 City of Roseville
May 2022-May 2024 4 City of Roseville
PART 1 ( )
The City of Roseville (City) is charged with complying the State Water Resources Control Board (SWRCB) Reissued WDR”,
Order No. 2022-0103-DWQ). The Reissued WDR replaced the original 2006 WDR (Order No. 2006-003- -0058-
on June 5, 2023.

The Reissued WDR requirements
to reduce
or eliminate sewer spills. -10 of the Reissued WDR requires periodic SSMP Audits to be completed by the City at least every three years.

To comply with the SSMP Audit requirements, Fischer Compliance LLC management completed a Sewer System Management Plan (SSMP) Audit covering May 2021 through May 2024.
- ), scaled to the size/complexity of the City’s sewer
system.

Regulatory Background
develop a Sewer System Management Plan (Sewer System Management Plan). Sewer System 2006 WDR: To provide a consistent, statewide regulatory approach to address sewage spills, the State Requirements for Sanitary Sewer Systems, Order No. 2006-0003 (SSS WDRs), on May 2, 2006. All public agencies that own or operate a sanitary sewer system that is comprised of more than one mile of pipes or sewer lines that convey wastewater to a publicly owned treatment facility were required to apply for coverage under the Order.
2022 WDR: Reissued WDR” (Order No. 2022-0103-
DWQ The Reissued WDR updates
many aspects of the 16-year-old Order and includes a number of new requirements for Sewer System Management Plans.

SSMP Audit Procedures
A comprehensive SSMP Audit procedures developed by Fischer Compliance LLC was completed in June 2024. To complete of the SSMP Audit, the following key elements were incorporated for the SSMP assessments:
o Evaluation of pre-Inspection questionnaires
o Interviews with City collection management and field including both online and onsite conferences May 2022-May 2024 5 City of Roseville
o Completion of a Compliance Evaluation Inspection (CEI) incorporating standards and procedures utilized by U.S. EPA and the Water Boards to evaluate sanitary sewer system compliance (see Appendix 1)
o Review of the City’s 2022 Sewer System Management Plan (SSMP) o Review of City spill reports, system data, and other documentation o Incorporation of guidelines and recommendations for SSMPs published by the Bay Area Clean Water Agencies (BACWA)1.

C
approximately 151,901 and includes a total of 53,720
consists of approximately 590 miles of gravity sewer mains, 8 miles and 17 /pump
Figure 1 below provides an overview of the City’s current sanitary sewer system service area. 1 Available for download at: https://bacwa.app.box.com/s/cucxst3w2c4fl53jopuyayt6b3u4xjs5/file/1489440015726 May 2022-May 2024 6 City of Roseville
Figure 1: City sanitary sewer system service area
Figure 2, below provides current City regulatory measures data published in the State Water Board Database (CIWQS)2.
2California Integrated Water Quality System (CIWQS), availably publicly at the following link:
https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/CiwqsReportServlet?inCommand=drilldown&reportName=facilityAtAGlance&placeID=630701&reportID=7029229 May 2022-May 2024 7 City of Roseville
Figure 2: CIWQS regulatory measures information (City of Roseville, WDID # 5SPILL10935)

May 2022-May 2024 8 City of Roseville
City SSMP/Audit Due Dates
provides an overview of upcoming due dates for the City to update its SSMP and complete its next SSMP Audit. Figure 4 below displays a summary of the upcoming due dates for the City (5/2/2025 for its next SSMP Update and 12/2/2024 for its next SSMP Audit) required under the Reissued WDR.

Figure 4: City of Roseville SSMP/Audit Due Dates
May 2022-May 2024 9 City of Roseville
City Spill Performance
an overview to showcase City spill performance including trends and benchmarks to allow a comparison of the City’s performance against agencies within the Central Valley Regional Board area and State. N 5-
8 below and Appendix 3, City Spill Performance Benchmark Report). As displayed in many of the City’s spill rates and volumes discharged during the Audit period were consistently lower than most other sanitary sewer system agencies of comparable size located within the Central Valley Regional Board area.

Figure 5: City of Roseville Spill Rates (# of spill per 100 miles of sewers) compared with other agencies May 2022-May 2024 10 City of Roseville
Figure 6: City of Roseville Spill Recovery Rates (%) compared with other agencies

City of Roseville, Waste Discharge ID
#5SPILL10935)
May 2022-May 2024 11 City of Roseville
Figure 7: City of Roseville spill volumes (gallons/year) compared with other agencies.

May 2022-May 2024 12 City of Roseville
Figure 8: City of Roseville historical spill summary (2011-2022).

May 2022-May 2024 13 City of Roseville
SSMP Audit Findings
Th -level summary of the SSMP Audit Tables 2 and 3 below). No WDR during the Audit. However, several Areas of Concern for the WDR were observed and documented in each SSMP element analysis located in PART 2 (Detailed SSMP Audit Findings). A total of 4/11 (36%) of were noted as Areas of Concern (64% compliance rate). A total of 3/12 (25%) of e noted as Areas of Concern (75% compliance rate).

Table 2: Summary of SSMP 2-2024)
Requirements Areas of Findings
-1 No No Improve
resources
Improve
-2 No Yes Improve LRO training
I /training
procedures
-3 Legal Authority No No None
-4 O/M Program No Yes Improve training, procedures,
known problem areas
Improve SSMP working knowledge
Improve CIWQS training on requirements.

Improve easement maintenance and emergency
response
-5 Design and
Performance
No No None
D-6 SERP No No
-7 Pipe Blockage
Control Program
No Yes Improve source control measures, schedule
-8 SECAP No Yes Improve assessments
procedures
-9 Monitoring,
Measurement
No No None
-10 Audits No No
-11 No No None
May 2022-May 2024 14 City of Roseville
Table 3: Summary of SSMP 2022-2024)
Requirements 3 Areas of
Concern 4 Findings
Spec. 5.1 No Yes Improve LRO training/oversight
Spec. 5.2 SSMP
Development,
No No None
Spec. 5.3 SSMP Updates No No None
Spec. 5.4 SSMP Audits No No
Audits
Spec. 5.6 System Resilience No Yes
each element includi
climate impacts.

Spec. 5.10 Resources No No Improve
resources
Spec. 5.11 Performance
Analysis
No No None
Spec. 5.12 SERP No Yes Improve training, regional partner Spec. 5.13 No No Improve training/
procedures
Spec. 5.14
(private spills)
No No None
Spec. 5.15 Failure to report No No None
Spec. 5.19 Proper O/M No No None
3 V (Violation of REISSUED WDR)
4 AOC (Area of Concern with REISSUED WDR)
May 2022-May 2024 15 City of Roseville
Conclusions
The SSMP Audit shed light on many
spill data/metrics performance with other
Central Valley Regional Water Board area and throughout the State, the City performs near the top.

Detailed review of q s,
and other data were relied on for City’s SSMP compliance and . dule were also
generated to help the City long before its next update is due (5/2/2024).

The Audit further revealed several areas of concern providing an advantage to help prepare the City for future , well ahead of the required
compliance schedule (>5 month ahead of schedule).

ELEMENT 1 –
May 2022-May 2024 16 City of Roseville
PART 2 (SSMP Audit Findings )
detailed SSMP Audit . The
procedures employed included
required in the Reissued WDR. Requirements are presented at the beginning for each element along with an analysis of City compliance and .
and provide resilience are also
included
with its next SSMP, due by August 2, 2025.

Element 1 –

1.1 Regulatory Context

1.2 SSMP Update Schedule

1.3 Sewer System Asset Overview
City Cityowned assets and service area including but not limited to.

Service area boundary.

System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and Data management systems.
lower sewer laterals.

Reference to the Enrollee’s up to-
ELEMENT 1 –
May 2022-May 2024 17 City of Roseville
Analysis)
Areas Assessed SSMP
Ref.

Audit Findings/
COMPLIANCE Pg. 22+ The City SSMP complies with the basic requirements. The City should SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 22+
due by May 2, 2025.
and maintenance to prevent spills.

EFFECTIVENESS Pg. 22+
work programs (see Appendix 2).
element:
-
-
-
-
-
- Has the Sewer System Management Plan been approved by the -
-
- Is asset data kept in the computerized maintenance management -
ELEMENT 1 –
May 2022-May 2024 18 City of Roseville
Areas Assessed SSMP
Ref.

Audit Findings/
RESILIENCE Pg. 22+ For added resilience, the City could incorporate the following:
-
- Implement a formal schedule to ensure all WDR compliance deadlines are logged into management calendars.

Ensure crosslement 1: )
Areas of
City In
No No Yes
Failure to update Sewer System Management Plan subelements No No Yes
Failure to establish process to ensure public has access/input to Sewer System Management Plan
No No Yes
Failure to complete appropriate Sewer System Management Plan audit
No No Yes
No No Yes
Failure to develop and implement
sewer maps
No No Yes
and maintenance to prevent spills.

No No Yes
spills
No No Yes
ELEMENT 1 –
May 2022-May 2024 19 City of Roseville
Element 2 –
REQUIREMENTS1
county environmental health City
ELEMENT 1 –
May 2022-May 2024 20 City of Roseville
Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 24+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 24+ The City should
its next SSMP Update due by May 2, 2025.

City management indicated that to some degree, decisions and input from the City LRO and could be further improved.
those proposed by developers that have historically been overridden ould
be further improved.

The revealed weaknesses in City internal compliant
procedures which could be further improved (see Appendix 1, Table 10, . However, the City adequately addressed this
(see
PostThe
AOC A3
and AOC B4) which should be pursued.
see Appendix 1,
6). However, the City addressed this concern
(see Post-
ELEMENT 1 –
May 2022-May 2024 21 City of Roseville
Areas Assessed SSMP Ref.

EFFECTIVENESS Pg. 24+
and Key Performance Indicators (KPIs) to track, measure, and adjust checks for this element:
- Have there been instances when a service call for a spill was not -
-
-
-
RESILIENCE Pg. 24+ For added resilience, the City could incorporate the following:
- Ensuring more than one person is capable and responsible for -up personnel.
-
-
elements.
- Periodically review contact info. to ensure it is up to date. )
Areas of
City In
with appropriate training and experience.

No No Yes
Failure to establish and update all related necessary No No Yes Failure to establish and update City chain of No No Yes ELEMENT 3 –
May 2022-May 2024 22 City of Roseville
Element 3 – Legal Authority
REQUIREMENTS5
The City Sewer System Management Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority.”
and other debris that may cause blockages.”
infrastructure to storm sewer infrastructure.”
operated by the Enrollee.”
(s) of ordinances, service agreements, or other legally binding procedures.” maintenance, as applicable.”
5 See Attachment D-3 of Reissued WDR (page D-4)
ELEMENT 6 –
May 2022-May 2024 23 City of Roseville
3: Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 28+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 28+ The City should
its next SSMP Update due by May 2, 2025.

EFFECTIVENESS Pg. 28+
and Key Performance Indicators (KPIs) to track, measure, and adjust checks for this element:
-
- Have there been instances when the code or ordinance did not RESILIENCE Pg. 28+ For added resilience, the City could incorporate the following:
- Monitor performance of ordinances, codes, and agreements for - Perform periodic review of ordinances, codes, and service agreements.
- Stay abreast of industry trends and local ordinances that may - Check to ensure codes and ordinances periodically reviewed.

ELEMENT 6 –
May 2022-May 2024 24 City of Roseville
3: )
City In
Failure to establish proper codes,
standards, legal agreements, and
procedures to ensure conformance to
requirements.

No No Yes
Failure to periodically review codes,
standards, legal agreements, and
procedures to ensure conformance to
requirements.

No No Yes
ELEMENT 6 –
May 2022-May 2024 25 City of Roseville
Element 4 –

4.1 Updated Map of Sewer System
REQUIREMENTS6
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and system service area boundaries.”

4.2 REQUIREMENTS1
The scheduling system must include:
, HigherMaintenance of known problem areas including areas with tree root problems Regular visual and closedsystem areas/components prone to root4.3 Training

REQUIREMENTS
-
ng data.”
6 See Attachment D-4.1 of Reissued WDR (page D-4)
ELEMENT 6 –
May 2022-May 2024 26 City of Roseville

4.4 Equipment Inventory
REQUIREMENTS1
parts.”
Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 32+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 32+ The City should
its next SSMP Update due by May 2, 2025.
could be further improved with use of spill /scenarios.

The revealed operator training and procedures could be
(see Appendix 1, Table 10, ,
s AOC A1 and AOC B1).
8 and AOC B3). However, the City addressed this
spare parts inventories to ensure spill response readiness (see PostA8). 1, Table 10, AOC B6). However, the City adequately addressed this - B6).
problem/ 1, Table 10, AOC B7) which
should be further improved.
procedures (see Appendix 1, Table 10, AOC B9) which should be further improved.

ELEMENT 6 –
May 2022-May 2024 27 City of Roseville
Areas Assessed SSMP Ref.

IMPLEMENTATION Pg. 32+
City’s
including easements (see Appendix 1, Table 10, AOC D1) which should be further improved).

City’s spill emergency response training program covering remote areas and open spaces including easements (see Appendix 1, Table 10, AOC D2) which should be further improved).
1, Table 10, AOC D3). However, the City adequately addressed this concern (see Appendix 1, PostEFFECTIVENESS Pg. 32+
and Key Performance Indicators (KPIs) to track, measure, and adjust checks for this element:
-
-
- Are newly installed assets incorporated into
- Are the City
- Does the City
-
-
-
- Does the City
-
- Have consistent training records been
-
- 1)
r
-
-
- Has the City experienced failure any spill responses
ELEMENT 6 –
May 2022-May 2024 28 City of Roseville
Areas Assessed SSMP Ref.

RESILIENCE Pg. 32+ For added resilience, the City could incorporate the following:
-
-
-
-
-
)
Failure to establish process to ensure
sewer maps are up to date.

No No Yes
Failure to establish and review
required maintenance program
No No Yes
Failure to establish adequate
contractors.

No Yes Yes
Failure to establish equipment No No Yes
ELEMENT 6 –
May 2022-May 2024 29 City of Roseville
Element 5 – Design and Performance Provisions

5.1 Updated
REQUIREMENTS7
the necessary component-
procedures must include componentdesign criteria.”

5.2 Procedures and Standards
REQUIREMENTS1
rehabilitated system pipelines, pumps, and other equipment and appurtenances.” Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 45+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 45+ The City should
its next SSMP Update due by May 2, 2025.
the opportunity to further improve design
standards (see Appendix 1, Table 10, AOC 10 the City
addressed this concern (see Post7 See Attachment D-5.1 of Reissued WDR (page D-5) ELEMENT 6 –
May 2022-May 2024 30 City of Roseville
EFFECTIVENESS Pg. 45+
2).
checks for this element:
- Does the City
- Does the City annually
conformance to requirements
- Does the City have a review process for its standards and procedures
-
-
- Does the City
RESILIENCE Pg. 45+ For added resilience, the City could incorporate the following:
- Staying abreast of industry trends and standards.
- Performing
- -built changes for trends and areas for design and
performance improvements.
)
Areas of
Concern
City In
Failure to establish, implement, and maintain
appropriate sewer standards and procedures for
No No Yes
Failure to enforce instances of noncompliance. No No Yes ELEMENT 6 –
May 2022-May 2024 31 City of Roseville
Element 6 – Spill Emergency Response Plan
REQUIREMENTS8
The Plan must include an up-to-date
Plan must include procedures to meet all the following. public health or reach waters of the State.
and applicable Regional Water Board Orders.
trained.

Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system.

Remove sewage from the drainage conveyance system.
the receiving waters.

City
Implement preConduct post-spill Guidance
Document and report spill events as required in this General Order.

Plan as needed.”
8 See Attachment D-6 of Reissued WDR (page D-6)
ELEMENT 7 –
May 2022-May 2024 32 City of Roseville
Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 50+ The City SSMP complies with the basic requirements. The City should complete a gap analysis and incorporate all SSMP Audit IMPLEMENTATION Pg. 50+ The City should
complete a gap analysis and incorporate all SSMP Audit
City management indicated the City does not perform any -planned dills or training with its stormwater.

City management commented during the
could
AOC A9 and AOC B5) which should be pursued to augment City resources .
-
OES within 2 hours required for Category 1 Spills in 2021-2022 (see Appendix 1, Table 10, AOC A11. The City is encouraged to contractor emergency response training (see Appendix 1, Table 10, AOC A12) which could be further improved. The concerns with spill emergency
response trainings including post-spill assessments (see Appendix 1, Table 10, AOC B2). However, the City adequate 1, PostFindings, AOC B2).

ELEMENT 7 –
May 2022-May 2024 33 City of Roseville
Areas Assessed SSMP Ref.

EFFECTIVENESS Pg. 50+
2).
checks for this element:
-
for spill emergency response plans incorporated in SSMP 37-28)
-
-
RESILIENCE Pg. 50+ For added resilience, the City could incorporate the following:
- Provide training on a regular basis for all spill response - Determining Spill Start Time
- Determining spill volume and volume recovered.
-
- Containment and clean up.
-
- Develop a training plan for contracted services.
- Periodically review post-spill assessments for trends and areas for improvement.

ELEMENT 7 –
May 2022-May 2024 34 City of Roseville
)
Areas of
Concern
City In
Failure to develop and implement a Spill
Emergency Response Plan that meets all
requirements.

No No Yes
Failure to test/evaluate emergency
procedures during including deploying
contracted services where necessary.

No No Yes
Failure to ensure supply of adequate
prior to spills.

No No Yes
No No Yes
ELEMENT 7 –
May 2022-May 2024 35 City of Roseville
Element 7 – Sewer Pipe Blockage Control Program
REQUIREMENTS9
determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags, and debris. a program is not needed. The procedures must include, at minimum:
pipe-blocking substances.

A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service substances generated within a sanitary sewer system service area.

The legal authority prohibits discharges to the system and measures to prevent spills and blockages.

Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal ,
requirements.
inspect and enforce the fats, oils, and grease ordinance. ”
9 See Attachment D-7 of Reissued WDR (page D-7)
ELEMENT 8 – SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS May 2022-May 2024 36 City of Roseville
Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 76+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 76+ The City should
its next SSMP Update due by May 2, 2025.

City management indicated the City could further improve an plan and schedule for a public and
outreach program that promotes proper disposal of pipe-blocking substances.

City Management commented during the that the City
grease producing
and AOC B8). The City is encouraged to pursue
EFFECTIVENESS Pg. 76+
2).
checks for this element:
-
- Is the agency receiving feedback on public outreach
- Is the debris and other sewage solids collected during -
- Have there been spills due to excessive fats, oil, or -
ELEMENT 8 – SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS May 2022-May 2024 37 City of Roseville
Areas Assessed SSMP Ref.

RESILIENCE Pg. 76+ For added resilience, the City could incorporate the following:
- Inspect assets directly downstream of grease producing businesses to-
-
- Perform regular assessments of system assets to monitor performance.
-
)
Areas of
Concern
City In
blockage program.

No No Yes
Failure to ensure adequate pipe blockage
control enforcement authority.

No No Yes
Failure to enforce requirements for instances of
noncompliance.

No No Yes
ELEMENT 8 – SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS May 2022-May 2024 38 City of Roseville
Element 8 –

REQUIREMENTS
Capacity and design criteria.

Capital improvement plan.”

8.1. REQUIREMENTS10
of system areas that:
- Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, - Are in
areas.
- Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean List.
methods.
from the system which can reasonably be expected to discharge into a water of the State. to sea level
10 See Attachment D-8.1 of Reissued WDR (pages D-7 and D-8) ELEMENT 11 –COMMUNICATION
May 2022-May 2024 39 City of Roseville
8: Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 82+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

The City has
exists which is being addressed in its current capital improvement plan (CIP).

City Management commented during the that it could
assessment to be inspected each year throughout the system.

City Management commented during the that the City
high environmental consequences, are located within the vicinity of surface waters, steep terrain, high groundwater, etc., and are within the vicinity of bacterial-related impairments
City Management commented during the that the City
does not currently assess climate change impacts other than power /
Management also commented that the City currently does not have However,
severe
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 40 City of Roseville
Areas Assessed SSMP Ref.

IMPLEMENTATION Pg. 82+ The City should complete a
Update due by May 2, 2025.

City Management commented during that it is
assessments, audits, ETC. which
should be improved.

Management commented during the
areas vulnerable to increases in erosive forces which should be further improved.

The
AOC A4) which should be further improved.

The
assessments for City force main sewers
AOC A5) which should be further improved.

EFFECTIVENESS Pg. 82+
this element:
- Number of capacity-
- Has the system responded to rain events as indicated by the -
- Rain event trends: Has there been changes in rain event -
- Is there an annual review of the Capital Improvement Plan by - Has the City
- Has the City
procedures.

ELEMENT 11 –COMMUNICATION
May 2022-May 2024 41 City of Roseville
8: )
Areas of
Concern
City In
Failure to develop and implement system
capital
improvement programs.

No No Yes
degree of environmental consequences if
vulnerable to collapse, failure, blockage,
capacity issues, or other system
No No Yes
within the vicinity of surface waters, steep
No No Yes
of receiving water with a bacterial-related
impairment on the most current Clean
No No Yes
Failure to develop and implement capital
improvement plan (CIP) for necessary
sewer system repairs and improvements
(short term and long-term).

No No Yes
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 42 City of Roseville
Element 9 –
REQUIREMENTS11
-
the steps for necessary Plan improvement, including:

Element.
and
Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 86+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 86+
its next SSMP Update due by May 2, 2025.

EFFECTIVENESS Pg. 86+
2).
checks for this element:
-
- Have Key Performance Indicators been developed to
- Has a plan and schedule been established to address
- Have changes been made to work programs and
11 See Attachment D-9 of Reissued WDR (page D-9)
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 43 City of Roseville
Areas Assessed SSMP Ref.

RESILIENCE Pg. 86+ For added resilience, the City could incorporate the following:
-
of the Sewer System Management Plan.
- Perform periodic reviews of the Sewer System Management Plan to help ensure the plan is being properly implemented. -
during the audit process.
- Periodically evaluate work programs to help ensure
)
Areas of
Concern
Failure to collect/maintain and evaluate
relevant data for monitoring, measuring, and
No No Yes
Failure to update/modify agency Sewer
System Management Plan based on results
from
for this element.

No No Yes
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 44 City of Roseville
Element 10 – Internal Audits
REQUIREMENTS12
Enrollee to comply
end of the Enrollee’s last required au -year audit
e
audit. At minimum, the audit must:
spills.

Order.
and
The Enrollee shall submit a complete audit report that includes:
-
-
-
12 See Attachment D-10 of Reissued WDR (page D-10)
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 45 City of Roseville
Analysis)
Areas Assessed SSMP Ref.

COMPLIANCE Pg. 92+ The City SSMP complies with the basic requirements. The City should its next SSMP Update due by May 2, 2025.

The City complies with this requirement SSMP internal
audits every 2 years since 2010 as required.
ncorporated into the
at the
management level).

IMPLEMENTATION Pg. 92+ The City should
its next SSMP Update due by May 2, 2025.

EFFECTIVENESS Pg. 92+
2).
checks for this element:
-
-
-
-
RESILIENCE Pg. 92+ For added resilience, the City could incorporate the following:
- Periodically evaluate key performance indicators to
Plan element.
-
- Calendar the audit due dates and complete the audit on - Prepare for announced/unannounced compliance
Board Pre-
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 46 City of Roseville
10: )
Areas of
Concern
City in
Management Plan audits.

No No Yes
Failure to measure Sewer System No No Yes
new enhancements via a plan/schedule (short
and long-term).

No No Yes
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 47 City of Roseville
Element 11 –
REQUIREMENTS13
updates.
maintenance, and capital improvement11: Analysis)
Areas Assessed SSMP Ref. Audit
COMPLIANCE Pg. 95+ The City SSMP complies with the basic requirements. The City should next SSMP Update due by May 2, 2025.

IMPLEMENTATION Pg. 95+ The City should complete
Update due by May 2, 2025.

EFFECTIVENESS Pg. 95+
nt (see Appendix 2).
for this element:
- Does the agency place all Sewer System Management Plan - Does the agency have signage, or other means, readily - Does the agency regularly communicate with other systems -
-
Areas Assessed SSMP Ref.
13 See Attachment D-11 of Reissued WDR (page D-10)
ELEMENT 11 –COMMUNICATION
May 2022-May 2024 48 City of Roseville
Areas Assessed SSMP Ref.

RESILIENCE Pg. 95+ - Use the Sewer System Management Plan as a tool to communicate to the public how the agency is managing the system.
- Maintain a consistent presence in the service area by - Make it clear and easy for the public to contact the agency. 11: )
Areas of Concern
especially during emergencies.

No No
Failure to solicit input on Sewer System Management Plan content. No No Failure to communicate with owners/operators of sewer system(s) connected to the agency’s sewer system.

No No
May 2022-May 2024 49 City of Roseville

LIST OF APPENDICIES
APPENDIX 1 –
APPENDIX 2 – City Performance Metrics and Key Performance Indicators (KPIs) APPENDIX 3 – City Spill Performance Benchmark Report
APPENDIX 4 – (2024-2025)
Sanitary Sewer
Collection System
WDID=5SSO10935

COMPLIANCE EVALUATION

INSPECTION REPORT
Prepared by:

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 2/24 Table of Contents

1. Introduction .................................................................................................................................................................. 3

2. Inspection Summary.................................................................................................................................................... 4

3. Inspection Procedures ................................................................................................................................................. 4

4. Inspection Tasks ........................................................................................................................................................... 5

5. TASK A (Pre-Inspection Conf – Superintendent) ................................................................................................... 6

6. TASK B (Pre-Inspection Conf – Supervisors) ........................................................................................................... 7

7. TASK C (Field Inspection #1/2 – Brady Pump Station) .......................................................................................... 9

8. TASK D (Field Inspection #2/2 – 8800 Sierra College Blvd) ................................................................................. 12

9. Findings and Recommendations ............................................................................................................................. 16

10. Post-Inspection Findings........................................................................................................................................... 19 List of Tables
Table 1 – Inspection Summary ........................................................................................................................................... 4 Table 2 – Summary of inspection Tasks during Inspection ........................................................................................... 5 Table 3 – TASK A (Best practices identified during inspection) ................................................................................... 6 Table 4 – TASK A (Areas of Concern) ............................................................................................................................... 7 Table 5 – Task B (Areas of Concern identified during inspection) ............................................................................... 8 Table 6 – Task C (Areas of Concern identified during inspection) ............................................................................. 12 Table 7 – Task D (Areas of Concern identified during inspection) ............................................................................. 15 Table 10 – Findings and Recommendations ................................................................................................................... 16 Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 3/24

1. Introduction
On January 30 ,2024, James Fischer and Chris Bracco (Fischer Compliance LLC) conducted a Compliance Evaluation Inspection (CEI) for the City of Roseville (City) to evaluate compliance with the Statewide Sanitary Sewer Systems General Order (Order No. 2022-0103-DWQ), hereafter “Reissued WDR1.

FACILTY INSPECTED: INSPECTED BY:

James Fischer, P.E.

NPDES Compliance Inspector2
Principal, FISCHER COMPLIANCE, LLC
________________ Date: 1/30/2024

SANITARY SEWER COLLECTION SYSTEM
(WASTEWATER)
Waste Discharge ID (WDID): 5SSO10935 (“Dry Creek CS”)
Water Quality Order(s) 2022-0103-DWQ (Reissued WDR)
Regional Water Boards 5S
County Sacramento
Population/Area 151,901 (2023 Questionnaire)
Miles of Sewers (gravity) 589.55 (2023 Questionnaire)
Miles of Sewers (force mains) 7.55 (2023 Questionnaire) Sewer Connections (#) 53,720 (2023 Questionnaire)
Lift/Pump Stations (#) 17 (2023 Questionnaire)
Above pipelines (#) 22 (2023 Questionnaire)
Air release valves (force mains, #) 3 (2023 Questionnaire) Sewer siphons (#) 22 (2023 Questionnaire)
Flows (dry/wet, million gallons per day) 17.5/43 (2023 Questionnaire) CWEA Maintenance Certifications (#) 32 (2023 Questionnaire) Sewer lower later responsibility (Y/N) Y (2023 Questionnaire) Final wastewater disposal Dry Creek and Pleasant Grove WWTPs

FACILITY REPRESENTATIVE TITLE CONTACT
Dan Pruden Superintendent (916) 746-1891
Shane Rodgers Supervisor (916) 746-1894
Cody Wilbanks Supervisor (916) 746-1889
1 See https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/wqo_2022-0103-dwq.pdf 2 Credentialed, U.S EPA summary(2017)
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 4/24

2. Inspection Summary
The inspection incorporated both pre-inspection meetings for comprehensively assessing the City’s SSMP compliance, implementation, and effectiveness with the Reissued WDR (see Tables 1-2 below). This information provides a key advantage for helping City managers proactively reflect on ways for further improving its and implementing necessary adjustments to existing programs for preparing for its required SSMP Audit due by November 2024.

A summary of the overall inspection areas assessed and scores for the City are provided in Table 1 below.

Table 1 – Inspection Summary

3. Inspection Procedures
The inspection incorporated the following procedures:

1. Desktop Review (review of City SSMP, previous regional board enforcement, benchmarks)

2. Pre-Inspection Meetings

3. Data Review (City answers to completed SWRCB/FCL Questionnaires, spill reports, work programs, other info.)

4. Compliance Evaluation Inspection

5. Post-Inspection Review
Item Tasks Areas Assessed WDR Reqs.

Compliance
(0-5)
Implementation
(0-5)
City
Points City Score
A Pre-Inspection
(Superintendent)
1800 Booth Rd
Field staff training program/competency, maintenance program, SCADA monitoring/improvements, SERP implementation, capital improvement program (CIP) collaboration between engineering and collections operations, lift station operator inspection logging/data and alarms, FOG enforcement, critical spare parts, mutual assistance practices, design/construction standards, customer complaint system/tracking, Key Performance
Indicators (KPIs), root controls, staff certifications, new enhancements necessary for complying with Reissued WDR
Order 2022-0103-DWQ
(Spec. 5.19, Att. D-4)
4 4 8 80%
B Pre-Inspection
(Supervisors)
1800 Booth Rd
Field staff training program/competency, pump station training, identification/tracking of critical spare parts, SERP training and implementation, post-spill assessments, Supervisor SSMP familiarity/training/inter-coordination, SSMP responsibilities, outside agency coordination, condition assessment process and data, FOG enforcement, new enhancements necessary for
complying with Reissued WDR
Order 222-0103-DWQ
(Spec. 5.19, Att. D-4)
4 3 7 70%
C Field Inspection
(Operator Interviews)
Brady Pump Station
8190 Brady Ln
Operator interviews (reviewed spill City emergency response readiness and procedures, operator training/competency, O/M activities, alarms, standard operating procedures (SOPs), and logbook; reviewed asset conditions)
Order 222-0103-DWQ
(Spec. 5.19, Att. D-4)
4 3 7 70%
D Field Inspection
(Operator Interviews)
8800 Sierra College Blvd
Operator interviews (reviewed spill City emergency response procedures; reviewed spill response/mitigation details and future planned activities for further minimizing future spills Order 222-0103-DWQ
(Spec. 5.19, Att. D-4)
4 4 8 80%
Avg. Compliance Score 75%
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 5/24

4. Inspection Tasks
The inspection incorporated several key tasks for evaluating the City’s SSMP compliance, implementation, and effectiveness with the Reissued WDR (see Table 2 below).

Table 2 – Summary of inspection Tasks during Inspection Task Description Areas Assessed WDR Citations
A Pre-Inspection Conf.
(Collection System
Superintendent)
1800 Booth Rd
Field staff training program/competency,
maintenance program, SCADA
monitoring/improvements, SERP
implementation, capital improvement
program (CIP) collaboration between
engineering and collections operations, lift
station operator inspection logging/data and
alarms, FOG enforcement, critical spare parts,
mutual assistance practices,
design/construction standards, customer
complaint system/tracking, Key Performance
Indicators (KPIs), root controls, staff
certifications, new enhancements necessary
for complying with Reissued WDR
Spec. 5.19
Att. D-4
Att. D-6
Att. D-8
Att. E1
Att. D-11
Att. D-5
Att. D-2
Att. D-8
Att. D-9
B Pre-Inspection Conf.
(Collection System
Supervisors)
1800 Booth Rd
Field staff training program/competency,
pump station training, identification/tracking
of critical spare parts, SERP training and
implementation, post-spill assessments,
Supervisor SSMP familiarity/training/intercoordination, SSMP responsibilities, outside agency coordination, condition assessment
process and data, FOG enforcement, new
enhancements necessary for complying with
Reissued WDR
Spec. 5.19
Att. D-4
Att. D-6
Att. D-2
Att. D-11
Att. D-8
Att. D-7
C Field Inspection #1/2
(Operator Interviews)
Brady Pump Station
8190 Brady Ln
Operator interviews (reviewed spill City
emergency response readiness and
procedures, operator training/competency,
O/M activities, alarms, standard operating
procedures (SOPs), and logbook; reviewed
asset conditions)
Spec. 5.19
Att. D-4
D Field Inspection #2/2
(Operator Interviews)
8800 Sierra College Blvd
Operator interviews (reviewed spill City
emergency response procedures; reviewed
spill response/mitigation records, details and
discussed future planned activities to
minimizing any future spills at location
Spec. 5.19
Att. D-4
Att. D-6
Att. E1
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 6/24

5. TASK A (Pre-Inspection Conf – Superintendent)
This task included a detailed interview with the City’s Collection System Superintendent, Mr. Dan Prudent who was very knowledgeable and instrumental in providing clear answers to all questions asked during the inspection. Mr. Pruden also provided a comprehensive set of documents requested previous Pre-Inspection conferences for supplementing data necessary for completing the SSMP Audit package.

TASK A (Photo A1): Pre-inspection conference with Superintendent (Mr. Dan Pruden).

A list of Best Practices (BPs) identified during the interview with the Superintendent is presented in Table 3 below.

Table 3 – TASK A (Best practices identified during inspection) TASK B Best Practices (BPs) WDR Citations
Pre-Inspection
(Collection
System
Supervisors)
BP A1: Tenured Superintendent and Supervisors with >50 years of combined experience
Spec. 5.7
Spec. 5.1
BP A2: High quality SSMP, Audits, SERP, spill reports, maintenance equipment
Spec. 5.2
Spec 5.12
Att. E1
BP A3: Extensive routine cleaning/inspection programs in place with demonstrated successful outcomes
Att. D-4
BP A4: Extensive pump station/backup power, and spill readiness efforts securely in place
Spec. 5.19
Att. D
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 7/24 The following Areas of Concern (AOC) were identified for Task A during the inspection (see Table 6 below).

Table 4 – TASK A (Areas of Concern)
Task A Areas of Concern (AOC) WDR Citations
Pre-Inspection Conf.
(Collection System
Superintendent)
AOC A1: Field staff training/SERP competency with pump
stations
Spec. 5.19
Att. D-4
AOC A2: Communication and coordination between City
dispatch operators and Collections management for ensuring all complaints are promptly assessed and addressed
Att. D-2
Att. E1
AOC A3: Legally Responsible Official (LRO) training/Data Submitter training
Spec. 5.1
AOC A4: Coordination (engineering/operations) Att. D-8
AOC A5: Force mains (condition assessments/monitoring) Att. D-8 AOC A6: Pump station coordination (electricians/line staff) Att. D-2 AOC A7: FOG program (implementation/enforcement) Att. D-7 AOC A8: Maintenance of critical spare parts, inventory Att. D-4 AOC A9: Improvements (regional partners, coordination) Att. D-6 AOC A10: Improvements (design, construction standards) Att. D-5 AOC A11: Improvements (Cal-OES notifications, Cat. 1 spills) Att E1 AOC A12: Improvements (SERP training for staff, contractors) Att. D-6

6. TASK B (Pre-Inspection Conf – Supervisors)
This task included interviews with both collection system Supervisors for further assessing the City’s SSMP compliance, implementation, and effectiveness against several key Reissued WDR requirements. This included reviewing training program, O/M programs, staffing, and other information. Mr. Rodgers and Mr. Wilbanks were very knowledgeable and provided clear answers to the majority of the questions asked during the inspection.

The Supervisors were asked questions jointly about things going well, best practices in place, and recommendations for what could further be improved. They both agreed with Mr. Pruden regarding the need to further improve the City’s existing training program and are concerned about having many inexperienced staff with less than 5 years of actual practical collection system maintenance experience. The Supervisors had some uncertainty with a number of the answers to questions about the City’s SSMP documentation, implementation practices of key SSMP elements, and explanation of existing work programs which could be further improved. A list of Areas of Concern (AOC) identified for Task B during the inspection are presented in Table 5 below.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 8/24 Location B (Photo B1): Pre-inspection conference with Supervisors (Mr. Shane Rodgers and Mr. Cody Wilbanks).

A list of Areas of Concern (AOC) identified for Task B during the inspection are presented in Table 5 below.

Table 5 – Task B (Areas of Concern identified during inspection) TASK B Areas of Concern (AOC) WDR Citations
Pre-Inspection
(Collection
System
Supervisors)
AOC B1: Inexperienced line staff/SSMP training/competency; pump station training
Spec. 5.19
Att. D-4
AOC B2: SERP implementation/trainings/post-spill assessments Att. D-6 AOC B3: Improvements to critical spare parts/inventory/controls Att. D-4 AOC B4: Supplemental Data Submitter CIWQS training Att. E1 AOC B5: Improvements (regional partners/ coordination) Att. D-6 AOC B6: Improvements (reducing “hot spots”) Att. D-4
AOC B7: Improvements (procedures for addressing system deficiencies) Att D-8 AOC B8: Improvements (FOG implementation/enforcement) Att. D-7 AOC B9: Training/familiarity with Reissued WDR requirements, the City’s SSMP, and CIWQS reporting procedures
Spec. 5.19
Att. D-4
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 9/24

7. TASK C (Field Inspection #1/2 – Brady Pump Station)
This task included interviewing collection system line staff to assess adequacy of the City’s existing program for training line staff for operations of the City’s pump stations to comply with Attachment D-6, Spill Emergency Response Plan, and Attachment D-4.3, Training (see photos C1-C6 below). This included interviews with field operations staff at the Brady station. Detailed questions about the station’s equipment, inspection/maintenance procedures, emergency troubleshooting procedures, and logbook were asked. Although operators were very experienced and knowledgeable, no specific references to standard procedures were cited and many answers asked during the assessment were either incomplete or inconsistent.

Alarms/Emergency Troubleshooting: To assess emergency response and troubleshooting, operators were asked questions about the station’s equipment, operations, and troubleshooting procedures for responding to alarm calls or possible emergencies at the station. No references to SSMP/standard procedures for pump stations were cited by operators.

Logbook: Inspection of the station logbook revealed only very basic entries being logged by operators without detailed information for maintenance activities or resolution of any problems encountered. Operators stated that pumps are serviced on 90-day intervals. However, inspection of the logbook entries revealed the last pump servicing was completed in July 2023.

Alarm Simulation: A high float alarm check was completed. No references to SSMP/standard procedures for pump stations for handling alarms were cited by operators (procedures for pulling float, checking motor control center (MCC) panel, calling wastewater treatment plant to inform them of the test, logging the test in logbook and into CMMS, etc.).

Allowable Downtime: The City completed comprehensive downtime calculations without power for all of its pump stations including the Brady station. The maximum allowable holding time specified for the Brady station is 11 hours (see Photo C3).

Bypassing: The inspection revealed the Brady station does not have a force main bypass valve installed and traditional bypassing would prove difficult due to challenges accessing the force main which flows under the adjacent creek immediately south/southwest of the station. No references to SSMP/standard procedures for pump stations for bypassing were cited by operators.

Spill Appearance Point: Operations staff were unable to quickly reference the lowest upstream spill appearance point for the station.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 10/24 Task C (Photo C1): Inspection of Brady Pump
Station; emergency notification signage mounted on
the station fence including City contact information.

Task C (Photo C2): Interviews with City field operations staff at station.

Task C (Photo C3): Inspection of station motor
control center (MCC) panel and controls. Task C (Photo C4): Inspection of station Wetwell.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 11/24 Task C (Photo C5): Inspection of station MCC panel; the City has written critical information for all of its pump stations including the Brady station for reference during routine/emergency operations; written specifications
include “allowable downtime without power=11 hours,
“overflow point= Wetwell”, decant manhole (MH C03-
216 located at 1311 Brady Lane; “high alarm” set
point=96”, “lag start” set point=70”, “lead start set
point=59”, “lead/lag” stop point=27”, “low alarm” set
point=12”, and “low float” set point at 4”).

Task C (Photo C6): Inspection of 2008 original
construction documentation stored in the MCC inside
panel at station.

Task C (Photo C7): Inspection of station logbook; only
basic entries are logged by operators.

Task C (Photo C8): Inspection of “Standard Operating
Procedure/Job Hazard Analysis” form stored in the MCC
inside panel; operations staff were unaware of the form; station operators were also initially unsure of lowest
upstream spill appearance point for station.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 12/24 A list of Areas of Concern (AOC) identified for Task C during the inspection are presented in Table 6 below.

Table 6 – Task C (Areas of Concern identified during inspection) TASK C Areas of Concern (AOC) WDR Citations
Field Inspection #1/2
(Operator Interviews)
Brady Pump Station
8190 Brady Ln
AOC C1: Insufficient answers to questions related to Standard Operating Procedures (SOP) for pump stations
Spec. 5.19
Att. D-4
AOC C2: Insufficient answers to inspection questions related to Spill Emergency Response Plan (SERP) implementation procedures, station equipment, and alarm response/procedures
Spec 5.12
Att. D-6

8. TASK D (Field Inspection #2/2 – 8800 Sierra College Blvd) This task included assessing the City’s response to addressing a spill originating from an odor complaint submitted to the City for this location (see Spill CIWQS Spill ID #891462 (Attachment X) and photos D1-D8 below). This call originated from a public odor complaint submitted to the City for field assessment and response. The problem was ultimately discovered to be caused by tree root problems within the City’s mainline sewer in this location.

Spill Summary Narrative (from Spill Technical Report submitted in CIWQS): “On Monday, December 4, 2023, the City Wastewater Collection Division received an odor complaint from a resident at 8800 Sierra College Blvd (Slate Creek Apartment Complex). The resident indicated that despite reporting a sulfur-like odor to the property manager, the resident hadn’t seen any action being taken. During the investigation of the odor complaint, the City Wastewater Collection Service Worker followed City standard operating procedures (SOPs) and discovered a sewer manhole (Asset SMH B08-032) located on a 8 inch City sewer main line discharging into a wetlands area located behind the apartment complex. The next downstream manhole (Asset ID) was discovered by the Service Worker to be fully obstructed by tree roots which the City determined after a lengthy investigation the cause of the sewer spill. Upon discovering the spill, the Service worker promptly notified a supervisor, and wastewater crews promptly implemented the City’s Sewer System Management Plan (SSMP) procedures outlined in the Spill Emergency Response Plan (SERP) for containment, control and mitigation of the spill. Due to its entry into the wetlands area which flows into Strap Ravine, the spill was treated as a Category 1. Prompt notification was made to Cal-OES and a control number issued. Following containment of the spill and initiating cleanup, it became apparent that the volume of the spill exceeded 50,000 gallons, which required the need for Water Quality Monitoring and submission of a Technical Report within 45 days as required by Attachment E1 of the Reissued WDR. The City followed all required procedures outlined in its SERP for effective spill investigation, response, and cleanup, including extensive deployment of City staff and resources including Hydro-Vac units, excavators, trash pumps, and washdown water to mitigate the effects of the spill.” Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 13/24 Task D (Photo D1): Inspection of former spill site (looking south/southwest); City improved former access and fully restored area immediately following the spill
Task D (Photo D2): Inspection of former spill site (looking west)
Task D (Photo D3): Inspection of manhole structure at
spill appearance point (manhole asset ID #B08-028; the
failure location was at manhole asset ID #B08-032.

Task D (Photo D4): Inspection of manhole structure; no
significant solids or debris observed in the channel,
barrel, or the bench area.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 14/24 Task D (Photo D5): Inspection of Strap Creek (looking
south/southeast); no evidence of spill/impacts observed Task D (Photo D6): Inspection of Strap Creek (looking
west/northwest); no evidence of spill/impacts observed
Task D (Photo D7): Close view of Strap Creek; no
evidence of spill impacts observed
Task D (Photo D8): Inspection of stormwater best
management practices (silt fence) installed for mitigating impacts to creek during spill cleanup/restoration; no
evidence of spill/impacts observed
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 15/24 The following Areas of Concern (AOC) were identified for Task D of the inspection (see Table 7 below).

Table 7 – Task D (Areas of Concern identified during inspection) TASK D Areas of Concern (AOC) Related WDR
Citations
Field Inspection #2/2
(Operator Interviews)
8800 Sierra College
Blvd
AOC D1: Risks/threats for future spills at this location Prohibitions AOC D2: SERP training/drills at this location Att. D-6
AOC D3: Lack of easement area access and maintenance Att. D-3 Spec. 5.19
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 16/24

9. Findings and Recommendations
To meet/exceed the requirements of the Reissued WDR, the Agency should address all findings including potential violations and areas of concerns identified in Table 10 below prior to completion of its next required SSMP Audit.

Table 10 – Findings and Recommendations
Areas of Concern (AOC) WDR Citations Recommendations
AOC A1: Field staff
training/competency with SERP
competency for pump stations
Spec. 5.19
Att. D-4
Improve operator training program for SERP/pump
stations; ensure adherence to established procedures;
update SSMP and change log when implemented
AOC A2: Communication and
coordination between City dispatch
operators and Collections
management for ensuring all
complaints are promptly assessed
and addressed
Att. D-2
Att. E1
Develop/improve internal compliant procedures to
ensure all incoming complaints are addressed between
departments in timely manner, recorded, and staff
adhere to expectations/procedures established; update
SSMP and change log when implemented
AOC A3: LRO training/Data
Submitter training
Spec. 5.1 Improve LRO/data submitter training to achieve desired results; update SSMP and change log when
implemented
AOC A4: Coordination
(engineering/operations)
Att. D-8 Improve coordination between engineering and
operations to achieve desired results; ensure
adherence to established procedures; update SSMP
and change log when implemented
AOC A5: Force mains (condition
assessments, monitoring)
Att. D-8 Initiate condition assessment program for force mains to achieve desired results; update SSMP and change log
when implemented
AOC A6: Pump station
coordination (electricians/line
staff)
Att. D-2 Improve training and coordination to achieve desired results; ensure adherence to established procedures;
update SSMP and change log when implemented
AOC A7: FOG program
(implementation/enforcement)
Att. D-7 Improve FOG program implementation to achieve
desired results; ensure adherence to established
procedures; update SSMP and change log when
implemented
AOC A8: Maintenance of critical
spare parts, inventory
Att. D-4 Improve existing inventory to achieve desired results; ensure adherence to established procedures; update
SSMP and change log when implemented
AOC A9: Improvements (regional
partners, coordination)
Att. D-6 Improve coordination to achieve desired results; update SSMP and change log when implemented
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 17/24 Areas of Concern (AOC) WDR Citations Recommendations
AOC A10: Improvements (design,
construction standards)
Att. D-5 Conduct routine period reviews of standards
to address any instances where insufficient
or ineffective; update SSMP and change log
when implemented
AOC A11: Improvements (Cal-OES
notifications, Cat. 1 spills)
Att E1 Improve SERP training/drills/implementation
to avoid future violations; ensure adherence
to established procedures; update SSMP and
change log when implemented
AOC A12: Improvements (SERP training for
staff/contractors)
Att. D-6 Improve SERP training/drills/implementation
with contractors; ensure adherence to
established procedures; update SSMP and
change log when implemented
AOC B1: Inexperienced line staff/SSMP
training/competency; pump station training
Spec. 5.19
Att. D-4
Refer to AOC A1
AOC B2: SERP implementation, trainings,
post-spill assessments
Att. D-6 Refer to AOC A1
AOC B3: Improvements to critical spare
parts/inventory, controls
Att. D-4 Refer to AOC A8
AOC B4: Supplemental Data Submitter CIWQS
training
Att. E1 Improve training; ensure adherence to
established procedures; update SSMP and
change log when implemented
AOC B5: Improvements (regional partners,
coordination)
Att. D-6 Refer to AOC A9
AOC B6: Improvements (reducing “hot spots”) Att. D-4 Implement “hot spot” elimination program; ensure adherence to established
procedures; update SSMP and change log
when implemented
AOC B7: Improvements (procedures for
addressing system deficiencies)
Att D-8 Improve narration detail for procedures in
place to inspect/identify and rectify
operations deficiencies discovered; update
SSMP and change log when implemented
AOC B8: Improvements (FOG implementation,
enforcement)
Att. D-7 Refer to AOC A7
AOC B9: Training/familiarity with the City’s
SSMP and CIWQS reporting procedures
Att. D-4
Att. E1
Improve Supervisor training on WDR
requirements, City SSMP details, and CIWQS
reporting requirements for Data Submitters
to ensure competency with entering all
appropriate data prior to certification of spill
reports by LRO (Legally Responsible Official).

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 18/24 Areas of Concern (AOC) WDR Citations Recommendations
AOC C1: Insufficient answers to questions
related to Standard Operating Procedures
(SOP) for pump stations
Spec. 5.19
Att. D-4
Improve SERP training/drills/implementation
to avoid future violations; ensure adherence
to established procedures; update SSMP and
change log when implemented
AOC C2: Insufficient answers to inspection
questions related to Spill Emergency Response
Plan (SERP) implementation procedures,
station equipment, and alarm
response/procedures
Spec 5.12
Att. D-6
Improve SERP training/drills/implementation
to avoid future violations; ensure adherence
to established procedures; update SSMP and
change log when implemented
Areas of Concern (AOC) WDR Citations Recommendations
AOC D1: Risks/threats for future spills in
remote areas
Prohibitions To help further reduce risks/threats/impacts from future spills at this location and at
other similar assets, the City should audit
and improve its existing maintenance
practices for remote locations; the City
should also consider utilization of monitoring
technology to help further improve oversight
of identified critical remote areas
AOC D2: SERP training/drills in remote areas Att. D-6 To help reduce risks/impacts with future spills, the City should consider conducting
customized drills for its SERP specific for
remote locations
AOC D3: Lack of easement area access and
maintenance
Att. D-3
Spec. 5.19
The City should further assess
access/maintenance practices for assets in
this location and others throughout the
system to ensure compliance with Att. D-3
requiring adequate accessibility for
operations and maintenance
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 19/24

10. Post-Inspection Findings
The Compliance Evaluation Inspection Report (CEI) was submitted to the City on March 7, 2024. In response, the following information was received from the City providing detailed responses to all Areas of Concern (AOCs) identified during the inspection report.

Areas of Concern (AOC) City Responses
AOC A1: Field staff
training/competency with SERP
competency for pump stations
“All staff receive training once a year on our SOP # 003 “Lift Station Inspection specifically”. They also receive additional training on lift stations once a year when we train of our SERP and SSMP (element 4). Lastly, they receive a separate training on SOP # 042 “Lift Station Overflow Structure”.

Our crews are taught that they have the support of management, and we can be called in any situation to help or advise.”
AOC A2: Communication and
coordination between City dispatch
operators and Collections
management for ensuring all
complaints are promptly assessed
and addressed
“The City of Roseville has a person that answers phones from 0630-1600 five days a week. If they are unavailable, after hours and on weekends we have an answering service that the call rolls over to. Calls received by the answering service are relayed to the Service Worker / On Call personnel.

The city also customer relationship management system that the public can use to contact us as well. We are also notified of odor complaints that are submitted online that the City can quickly respond too. Are communication with regulatory agencies is handled by reporting on CIWQS, spills that are category 1 or over 1000 gallons are reported to OES as required.” AOC A3: LRO training/Data
Submitter training
“LRO and data submitting training is learned on the job and by attending CWEA and Tri State training classes. Additional training is received through consultant training classes as well. All LRO’s and data submitted hold at a minimum a CWEA Collection System maintenance Grade 4 or is a registered PE in California.“
AOC A4: Coordination
(engineering/operations)
“The City of Roseville plans capital improvements through system evaluation and condition assessment. Areas of concern are identified with CCTV, visual observations, modeling and impacts on environmental areas of concern. Projects are scheduled and planned through our Tech Services group and on projects that we bring to them we are highly involved. We are currently working with Tech Services on two areas where we have capacity issues. The projects will upsize the existing mains to allow for more capacity and relieve choke points. Projects that effect the collection system on the development side are handled by our Development Services group and Wastewater Collections is involved in these activities. The actual design we do have input on, but we are not involved so much with the day to day building of the infrastructure. If changes are made in the field, we may not know about them until much later. More oversite is needed by the wastewater Collection staff.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 20/24 Areas of Concern (AOC) City Responses
AOC A5: Force mains (condition
assessments, monitoring)
A5: The City of Roseville is currently working on a project to complete a full condition assessment of its force mains. As of today, we have not started a full condition assessment of our force mains do to the lack of technology out there. Tech Service is working to find a technology that will work for our small diameter mains. It may come down to excavating and removing a coupon to do our evaluation.

AOC A6: Pump station
coordination (electricians/line
staff)
A6: Wastewater Collection staff are only authorized to operate lift stations with the Hand Off Auto switch. All other electrical work is performed by our Electrical Technicians. These staff members are available 24/7, 365 and have full access to spare / stocked parts that may be required. They can perform electrical work, signal and control wiring, PLC and SCDA programming and troubleshooting.

AOC A7: FOG program
(implementation/enforcement)
A7: The City of Roseville has two full time FOG inspectors that perform public outreach and enforces the City’s municipal code section 14.14. The city relies on two components to control FOG, 1. Cleaning and inspection 2.

Enforcement and education working with our FSE’s. You may also refer to element #7 of our SSMP. We are working with Code Enforcement to apply monetary penalties on an as needed basis. We have developed a program that is currently at the City Attorney’s Office for review where we do the inspection, notification of violation (three times) and then hand of to Code enforce the monetary aspect of the enforcement or the closing of the business. We also have language in the code that we can sever or temporarily stop flow from an establishment.

AOC A8: Maintenance of critical
spare parts, inventory
A8: The City of Roseville has identified critical parts that are required to be on hand for the preventive maintenance and emergency maintenance that may be required. These parts are called out in our SSMP element #4 Operation and Maintenance. All electrical components are maintained in our mechanical maintenance warehouse that is controlled by the electrical technicians at the Dry Creek WWTP. All repair fittings and pipe are warehoused at the Collections building and controlled by the wastewater collections team. As material / components are used they are replaced to maintain a reasonable inventory of required parts. All warehoused material is controlled by a material technician that works in wastewater collections to allow better control of what we need to have on hand.

AOC A9: Improvements (regional
partners, coordination)
A9: More work can be performed here. There is a JPA in place but nothing specific to mutual aid and how that would work in an emergency. We do meet three times a year with our satellite agencies, and we do from time to time reach out to work on and or discuss issues of the day.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 21/24 Areas of Concern (AOC) City Responses
AOC A10: Improvements (design,
construction standards)
“As stated in element #5 of our SSMP, the City of Roseville maintains design and construction standards with minimum requirements for developers and contractors for installing a complete and operable wastewater collection system. The standard has language that calls out for air and vacuum testing along with CCTV for acceptance. The City of Roseville also has a punch list procedure to communicate unacceptable work to developers and contractors. According to the National Clay Pipe Institute the City of Roseville has the most stringent standard for installation and acceptance in the country.”
AOC A11: Improvements (Cal-OES
notifications, Cat. 1 spills)
“All category 1 and 2 spills are reported to Cal OES with in the required two hours. All information that is required to be reported is given to the Cal OES operator based on the questions that they ask, and a control number is obtained. Should information change there is an option for updating information. Water samples are taken for spills that are greater than 50,000 gallons. See element #6 of our SSMP.”
AOC A12: Improvements (SERP
training for staff/contractors)
“We train on the SERP annually and impromptu classes and testing are conducted through the year. We use an onsite spill simulator to train on spills from a lower lateral clean out and a sewer manhole. Spill volume and start and stop times estimation are trained on as well.” “We respond to calls for service within 20 minutes during business hours and within 40 minutes after hours and on weekend and holidays. We train on containing the spill, eliminating the cause, and mitigating the impacts of the spill. Notifications for category 1 and 2 spills are made as required and all spills are photographed and documented. Spills that require reporting to CIWQS are done so within the required time.”
Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 22/24 Areas of Concern (AOC) City Responses
AOC B1: Inexperienced line
staff/SSMP training/competency;
pump station training
B1: While the personnel question may not have answered all the question to the satisfaction of the interviewer it does not mean that they do not know that their job is to protect from dischargers to the environment. The personal questioned were from other crews and do not typically work on lift stations. They have been trained and if they had arrived at a true spill, they would have followed their training to mitigate the issue.

AOC B2: SERP implementation,
trainings, post-spill assessments
B2: All COR WWC staff have been trained on the SERP twice in the last year.

The first training was conducted by the LRO, and a second training was conducted with a consultant. One Source Utility Consulting was used for a half day training along with a spill simulator test for volume estimation, duration and volume recovered. Post spill assessments are completed by the LRO or his supervisors this is not a requirement of the operation staff.

AOC B3: Improvements to critical
spare parts/inventory, controls
B3: The warehousing of critical spare parts is sufficient to handle any issues that we may encounter. To date we have not had a spill due to lack of spare parts. In extreme cases bypass pumping of the lift stations could be performed as well as any mains that we have in our system.

AOC B4: Supplemental Data
Submitter CIWQS training
B4: More training may be warranted here and adding another LRO in Collections should be implemented. Seek out third party training for additional compliance training.

AOC B5: Improvements (regional
partners, coordination)
B5: More work can be performed here. There is a JPA in place but nothing specific to mutual aid and how that would work in an emergency. We do meet three times a year with our satellite agencies.

AOC B6: Improvements (reducing
“hot spots”)
B6: Hot Spots are removed, when possible, by way of CIPP or replacing with new pipe. We also use FOG Inspection and compliance measure to try and reduce Hot Spots. Time has taught us the FOG does stick to CIP so removal of a main does not mean in perpetuity, it can end up back on the list! AOC B7: Improvements
(procedures for addressing system
deficiencies)
B7: Improvements are based on our Vactor operator’s observations and CCTV crews condition assessment. We also contract with outside contractors to perform condition assessment of our larger trunk mains. We recently bypassed pumped and inspected our 63” and 66” in two locations to determine the cause and possible extent of damage after blistering was seen in the 2019 Condition assessment of the same mains. As issues are found through condition assessments of collector’s work orders are created and prioritized for repair. COR has its own in house construction crew and work is performed to make all repairs.

AOC B8: Improvements (FOG
implementation, enforcement)
B8: The City of Roseville has two full time FOG inspectors that perform public outreach and enforces the City’s municipal code section 14.14. The city relies on two components to control FOG, 1. Cleaning and inspection 2.

Enforcement and education working with our FSE’s. You may also refer to element #7 of our SSMP. We work with Code enforcement to apply monetary penalties on an as needed basis.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 23/24 Areas of Concern (AOC) City Responses
AOC B9: Training/familiarity with
the City’s SSMP and CIWQS
reporting procedures
B9: More hands on training is required for probationary employees and a few of our Journeymen. Personnel can sometimes get placed on a crew for years on end and the day to day knowledge may be lost when asked to fill in on another discipline. We train annually on lift station operations the SERP, WDR and SSMP as well as SOP training for mission essential equipment used for preventive and reactive maintenance.

Areas of Concern (AOC) City Responses
AOC C1: Insufficient answers to
questions related to Standard
Operating Procedures (SOP) for
pump stations
C1: While the answers may have been insufficient at the time the fact is that all employees know that if they arrive at any call for service that if they have any questions or issue, they can always call a supervisor. We can improve in this area; we have created an atmosphere where the crews rely on direction from leads and supervisors. More will be done in this space to make the crews feel they can do this all on their own.

AOC C2: Insufficient answers to
inspection questions related to
Spill Emergency Response Plan
(SERP) implementation procedures,
station equipment, and alarm
response/procedures
C2: There has been training and testing on the SERP and on lift station operations, but this audit shows more work is needed. New testing requirements will be implemented for both the SERP and Lift Station training along with impromptu testing on all our disciplines in wastewater collections.

Areas of Concern (AOC) City Responses
AOC D1: Risks/threats for future
spills in remote areas
D1: The first lesson learned from this spill was the need for a more aggressive and consistent hydro cleaning schedule for easements and open spaces. We have embarked on a new program that has identified all easements and open spaces and prioritized mains that if water were to spill would have the greatest impact on the environment. Second, we have procured an easement machine to better access some of the harder to reach SMH in easements. This machine adds an additional 500’ of reach to the 800’ we have on our Vactor trucks.

AOC D2: SERP training/drills in
remote areas
D2: With our annual training we will be adding an element to cover easements and how to access hard to reach manholes. We will also cover deployment of the easement machine and best practices for working in off site locations. Included in this training we will touch on spill containment and recovery of spilled water as open spaces and easement offer their own unique challenges.

AOC D3: Lack of easement area
access and maintenance
D3: We have identified areas of concern with regards to access. We are working on removing brush and overgrowth in some areas along with installing base rock and building solid access roads in others. The City’s Public Works Department has under construction right now a bike path project that Wastewater Collection worked with them on to gain access to more SMH’s along creeks. There is a second project that is kicking off that Collections is involved that will give us even more access to SMH’s.

Compliance Evaluation Inspection (City of Roseville – 1/30/2024) Page 24/24

END OF REPORT
Appendix 2 - City Performance Metrics and KPIs
f4ppendix 3 - City Spill Performance Report
The purpose of this Appendix is to provide visual data tools to showcase the City's historic spill performance compared with other collection system agencies within the Central Valley Regional Water Board area and state from the required City Audit period 512/2021 to 512/2024).

List of Figures
Figure 1 -City Spill Dashboard during SSMP Audit Period (May 2021-May 2024) ...................................................................... 2 Figure 2 - City Spill Dashboard (volume of spills by year during SSMP Audit Period (May 2021-May 2024) .................................. 3 Figure 3 - City Spill Net Volume compared to agencies by year during SSMP Audit Period (May 2021-May 2024) ........................ 4 Figure 4 - City Spill Volumes Recovered compared to agencies by year during SSMP Audit Period (May 2021-May 2024) ............ 5 Figure 5 - City Spill Causes (by# of spill) during SSMP Audit Period (May 2021-May 2024) ......................................................... 6 Figure 6 -City Spill Causes (by volume of spill) during SSMP Audit Period (May 2021-May 2024) ............................................... 7 Figure 3 - Spill Causes (by Where Failure Occurred, May 2021-May 2024) ................................................................................ 8 Figure 7 - City Spill Counts of Where Failures Occurred during SSMP Audit Period (May 2021-May 2024) .................................. 8 Figure 8-City Spill Benchmarks during SSMP Audit period (May 2021-May 2024) .................................................................... 9 Figure 1 – City Spill Dashboard during SSMP Audit Period (May 2021-May 2024) Observation: The City’s rolling average spill rate per year during the SSMP Audit period decreased from 0.49 spills/100 miles of sewer per year to 0.04 spills/100 miles of sewer per year.

Figure 2 - City Spill Dashboard (volume of spills by year during SSMP Audit Period (May 2021-May 2024) Observations: The City’s volume of spills per capita (population) decreased during the SSMP Audit period from 0.139 gallons per capita to 0.002 gallons per capita). The City’s average recovery (%) for Category 1 spills averaged 38% and 88% for Category 3 spills during the SSMP Audit period.

Figure 3 - City Spill Net Volume compared to agencies by year during SSMP Audit Period (May 2021-May 2024) Observations: The City’s net spill volume decreased during the SSMP Audit period from 12,960 gallons in 2022 to 28 gallons. The City’s average recovery (%) for Category 1 spills averaged 38% and 88% for Category 3 spills during the SSMP Audit period.

Figure 4 - City Spill Volumes Recovered compared to agencies by year during SSMP Audit Period (May 2021-May 2024) Observations: The City’s spill % of spill volume recovered for Category 1 spills (38%) and for Category 3 spills (88%) was higher than most other agencies within the region during the SSMP Audit period.

Figure 5 - City Spill Causes (by # of spill) during SSMP Audit Period (May 2021-May 2024) Observation: The City’s spill main causes (by number of spills) were root intrusion and grease during the SSMP Audit period.

Figure 6 - City Spill Causes (by volume of spill) during SSMP Audit Period (May 2021-May 2024) Observation: The City’s spill main cause (by volume of spills) was rainfall (wet weather) during the SSMP Audit period.

Figure 7 – City Spill Counts of Where Failures Occurred during SSMP Audit Period (May 2021-May 2024)

Figure 3 - Spill Causes (by Where Failure Occurred, May 2021-May 2024) Observation: The City’s main asset location were failures occurred was from lower sewer laterals during the SSMP Audit period.

Figure 8 – City Spill Benchmarks during SSMP Audit period (May 2021-May 2024) Observations: The City averaged approximately 24 minutes between the agency spill notification time and operator arrival times (removing erroneous data logged for spill ID #885184 occurring on 12/31/2022). The City failed to notify Cal-OES within two hours (32 minutes late) for one spill occurring on 12/31/2022 (spill ID #885184. Erroneous data was also observed for two spills (ID #884376 and #881796). The City was fully compliant with providing draft and certified reports within the required timeframes for all Category 1 spills during the SSMP Audit.

Appendix 4 — City SSMP Audit Implementation Plan and Schedule The purpose of this Appendix is to provide a plan/schedule to address SSMP Audit , recommendations, and corrective actions the City’s next required SSMP update (due on or before May 2, 2024).

FINDINGS (ATTACHMENTS)
Requirements Start Date End Date
-1 Goal & Intro Aug-Sept 2024 Aug-Sept 2024
system resources
Improve
repairs
-2 Aug-Sept 2024 Aug-Sept 2024
training
Improve internal
-3 Legal Authority N/A N/A None
-4 O/M Program Oct-Dec 2024 Oct-Dec 2024 Improve training, procedures, areas
Improve CIWQS training on
Improve easement maintenance and
-5 Design and N/A N/A None
-6 SERP Oct-Dec 2024 Oct-Dec 2024 Improve training, regional partner -7
Control Program
Jan-March 2025 Jan-March 2025 Improve source control measures, schedule
-8 SECAP Jan-March 2025 Jan-March 2025
procedures
-9 Monitoring,
Measurement
N/A N/A None
-10 Audits Jan-March 2025 Jan-March 2025
Audits
-11 N/A N/A None

FINDINGS (SPECIFICATIONS)
Requirements Start Date End Date
Spec. 5.1 Designation of
LRO
Aug-Sept 2024 Aug-Sept 2024 Improve LRO
training/oversight
Spec. 5.2 SSMP
Development,
Implementation
N/A N/A None
Spec. 5.3 SSMP Updates N/A N/A None
Spec. 5.4 SSMP Audits Oct-Dec 2024 Oct-Dec 2024
for future Audits
Spec. 5.6 System
Resilience
Oct-Dec 2024 Oct-Dec 2024 Consider recommendations
outlined in each element
Spec. 5.10 Resources Oct-Dec 2024 Oct-Dec 2024 Improve evaluating allocation of collection system
resources
Spec. 5.11 Performance
Analysis
N/A N/A None
Spec. 5.12 SERP Jan-March 2025 Jan-March 2025 Improve training, regional partner collaboration
Spec. 5.13 Notif, Monitoring,
Reporting,
Records
Jan-March 2025 Jan-March 2025
collection procedures
Spec. 5.14
(private spills)
N/A N/A None
Spec. 5.15 Failure to report N/A N/A None
RESOLUTION NO. 25-097

RECERTIFICATION OF THE CITY OF ROSEVILLE

SEWER SYSTEM MANAGEMENT PLAN
WHEREAS, in May 2006 the State Water Resources Control Board issued a state-wide General Waste Discharge Requirement (WDR) Order requiring all public entities that own or operate sanitary sewer systems greater than one mile in length that collect or convey wastewater to prepare a certified Sewer System Management Plan (SSMP); and WHEREAS, the City Council adopted and certified the original SSMP in 2007 and recertified the City’s SSMP in October 2022, which incorporated recommended changes proposed during an audit by an outside consultant; and
WHEREAS, provisions in the WDR require recertification of the SSMP every five years or if significant changes to the SSMP have been made; and WHEREAS, the City Council has reviewed the revised Sewer System Management Plan.

NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Roseville that it hereby recertifies the City of Roseville Sewer System Management Plan.

PASSED AND ADOPTED by the Council of the City of Roseville this ___ day of ______________, 20__, by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:
______________________________
MAYOR
ATTEST:
________________________
City Clerk
1 STATE WATER RESOURCES CONTROL BOARD
1001 I Street, Sacramento, California 95814
ORDER WQ 2022-0103-DWQ

STATEWIDE WASTE DISCHARGE REQUIREMENTS

GENERAL ORDER FOR SANITARY SEWER SYSTEMS
This Order was adopted by the State Water Resources Control Board on December 6, 2022.

This Order shall become effective 180 days after the Adoption Date of this General Order, on June 5, 2023.

The Enrollee shall comply with the requirements of this Order upon the Effective Date of this General Order.

This General Order does not convey any property rights of any sort or any exclusive privileges.

The requirements prescribed herein do not authorize the commission of any act causing injury to persons or property, protect the Enrollee from liability under federal, state, or local laws, nor create a vested right for the Enrollee to continue the discharge of waste.

CERTIFICATION
I, Jeanine Townsend, Clerk to the Board, do hereby certify that this Order with all attachments is a full, true, and correct copy of the Order adopted by the State Water Board on December 6, 2022.

AYE: Chair E. Joaquin Esquivel
Vice Chair Dorene D’Adamo
Board Member Sean Maguire
Board Member Laurel Firestone
Board Member Nichole Morgan
NAY: None
ABSENT: None
ABSTAIN: None
for
Jeanine Townsend
Clerk to the Board

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
2 Table of Contents

1. Introduction .................................................................................................................... 4

2. Regulatory Coverage and Application Requirements .................................................... 5

2.1. Requirements for Continuation of Existing Regulatory Coverage ....................... 5

2.2. Requirements for New Regulatory Coverage...................................................... 5

2.3. Regulatory Coverage Transfer............................................................................ 7

3. Findings ......................................................................................................................... 7

3.1. Legal Authorities ................................................................................................. 7

3.2. General ............................................................................................................. 11

3.3. Water Quality Control Plans, Policies and Resolutions ..................................... 14

3.4. California Environmental Quality Act................................................................. 16

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders ................................................................................................... 16

3.6. Notification to Interested Parties ....................................................................... 17

4. Prohibitions .................................................................................................................. 17

4.1 Discharge of Sewage from a Sanitary Sewer System....................................... 17

4.2. Discharge of Sewage to Waters of the State..................................................... 17

4.3. Discharge of Sewage Creating a Nuisance....................................................... 18

5. Specifications............................................................................................................... 18

5.1. Designation of a Legally Responsible Official ................................................... 18

5.2. Sewer System Management Plan Development and Implementation............... 18

5.3. Certification of Sewer System Management Plan and Plan Updates................ 19

5.4. Sewer System Management Plan Audits .......................................................... 19

5.5. Six-Year Sewer System Management Plan Update.......................................... 21

5.6. System Resilience............................................................................................. 22

5.7. Allocation of Resources .................................................................................... 22

5.8. Designation of Data Submitters......................................................................... 22

5.9. Reporting Certification....................................................................................... 22

5.10. System Capacity ............................................................................................... 23

5.11. System Performance Analysis .......................................................................... 23

5.12. Spill Emergency Response Plan and Remedial Actions ................................... 23

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements ............. 24

5.14. Electronic Sanitary Sewer System Service Area Boundary Map....................... 26

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems ................................................................................... 26

5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services ..................................................... 27

5.17. Unintended Failure to Report ............................................................................ 27

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
3 5.18. Duty to Report to Water Boards ........................................................................ 27

5.19. Operation and Maintenance............................................................................... 27

6. Provisions .................................................................................................................... 27

6.1. Enforcement Provisions .................................................................................... 27

6.2. Other Regional Water Board Orders ................................................................. 30

6.3. Sewer System Management Plan Availability ................................................... 31

6.4. Entry and Inspection ......................................................................................... 31 Table of Attachments
Attachment A – Definitions .....................................................................................................A-1 Attachment B – Application for Enrollment .............................................................................B-1 Attachment C - Notice of Termination.....................................................................................C-1 Attachment D – Sewer System Management Plan – Required Elements ..............................D-1 Attachment E1 – Notification, Monitoring, Reporting and Recordkeeping Requirements .....E1-1 Attachment E2 – Summary of Notification, Monitoring and Reporting Requirements...........E2-1 Attachment F – Regional Water Quality Control Board Contact Information ..........................F-1

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
4 1. INTRODUCTION
This General Order regulates sanitary sewer systems designed to convey sewage. For the purpose of this Order, a sanitary sewer system includes, but is not limited to, pipes, valves, pump stations, manholes, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks. A sanitary sewer system includes:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

Sewage is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Sewage contains high levels of suspended solids, non-digested organic waste, pathogenic bacteria, viruses, toxic pollutants, nutrients, oxygen-demanding organic compounds, oils, grease, pharmaceuticals, and other harmful pollutants.

For the purpose of this General Order, a spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Sewage and its associated wastewater spilled from a sanitary sewer system may threaten public health, beneficial uses of waters of the State, and the environment.

This General Order serves as statewide waste discharge requirements and supersedes the previous State Water Resources Control Board (State Water Board) Order 2006-0003-DWQ and amendments thereafter. All sections and attachments of this General Order are enforceable by the State Water Board and Regional Water Quality Control Boards (Regional Water Boards). Through this General Order, the State Water Board requires an Enrollee to:
• Comply with federal and state prohibitions of discharge of sewage to waters of the State, including federal waters of the United States;
• Comply with specifications, and notification, monitoring, reporting and recordkeeping requirements in this General Order that implement the federal Clean Water Act, the California Water Code (Water Code), water quality control plans (including Regional Water Board Basin Plans) and policies;
• Proactively operate and maintain resilient sanitary sewer systems to prevent spills; • Eliminate discharges of sewage to waters of the State through effective implementation of a Sewer System Management Plan;
• Monitor, track, and analyze spills for ongoing system-specific performance improvements; and
• Report noncompliance with this General Order per reporting requirements.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
5 An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one (1) mile or less in length where the State Water Board or a Regional Water Board requires regulatory coverage under this Order; or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Board or a Regional Water Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

For the purpose of this Order, a sanitary sewer system includes only systems owned and/or operated by the Enrollee.

2. REGULATORY COVERAGE AND APPLICATION REQUIREMENTS

2.1. Requirements for Continuation of Existing Regulatory Coverage To continue regulatory coverage from previous Order 2006-0003-DWQ under this General Order, within the 60-days-prior-to the Effective Date of this General Order, the Legally Responsible Official of an existing Enrollee shall electronically certify the Continuation of Existing Regulatory Coverage form in the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. The Legally Responsible Official will receive an automated CIWQS-issued Notice of Applicability email, confirming continuation of regulatory coverage under this General Order. All regulatory coverage under previous Order 2006-0003-DWQ will cease on the Effective Date of this Order.

An Enrollee continuing existing regulatory coverage is not required to submit a new application package or pay an application fee for enrollment under this General Order.

The annual fee due date for continued regulatory coverage from previous Order 2006-0003-DWQ to this General Order remains unchanged.

A previous Enrollee of Order 2006-0003-DWQ that fails to certify the Continuation of Existing Regulatory Coverage form in the online CIWQS database by the Effective Date of this Order is considered a New Applicant, and will not have regulatory coverage for its sanitary sewer system(s) until:
• A new application package for system(s) enrollment is submitted per section 2.2 (Requirements for New Regulatory Coverage) below; and
• The new application package is approved per section 2.2.2 (Approval of Application Package (For New Applicants Only)).

2.2. Requirements for New Regulatory Coverage
No later than 60 days prior to commencing and/or assuming operation and maintenance responsibilities of a sanitary sewer system, a duly authorized representative that

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
6 maintains legal authority over the public or private sanitary sewer system is required to enroll under this General Order by submitting a complete application package as specified below and as provided in Attachment B (Application for Enrollment Form) of this General Order.

Unless required by a Regional Water Board, a public agency that owns a combined sewer system subject to the Combined Sewer Overflow Control Policy (33 U.S. Code § 1342(q)), is not required to enroll, under this Order, the portions of its sanitary sewer system(s) that collects combined sanitary wastewater and stormwater.

2.2.1. Application Package Requirements
The Application for Enrollment package for new applicants must include the following items:
• Application for Enrollment Form. The form in Attachment B of this General Order must be completed, signed, and certified by a Legally Responsible Official, in accordance with section 5.1 (Designation of a Legally Responsible Official) of this General Order. If an electronic Application for Enrollment form is available at the time of application, a new applicant shall submit its application form electronically; and
• Application Fee. A fee payable to the “State Water Resources Control Board” in accordance with the Fee Schedule in the California Code of Regulations, Title 23, section 2200, or subsequent fee regulations updates.

The application fee for this General Order is based on the sanitary sewer system’s threat to water quality and complexity designations of category 2C or 3C, which is assigned based on the population served by the system. The current Fee Schedule for sanitary sewer systems is listed under subdivision (a)(2) at the following website:

Fee Schedule (https://www.waterboards.ca.gov/resources/fees/water_quality/).

2.2.2. Approval of Application Package (For New Applicants Only) The Deputy Director of the State Water Board, Division of Water Quality (Deputy Director) will consider approval of each complete Application for Enrollment package.

The Deputy Director will issue a Notice of Applicability letter which serves as approved regulatory coverage for the new Enrollee.

If the submitted application package is not complete in accordance with section 2.2.1 (Application Package Requirements) of this General Order, the Deputy Director will send a response letter to the applicant outlining the application deficiencies. The applicant will have 60 days from the date of the response letter to correct the application deficiencies and submit the identified items necessary to complete the application package to the State Water Board.

2.2.3. Electronic Reporting Account for New Enrollee
Within 30 days after the date of the Approval of Complete Application Package for System Enrollment, a duly authorized representative for the Enrollee shall obtain a CIWQS Sanitary Sewer System Database user account by clicking the “User Registration” button and following the directions on the CIWQS Login Page

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
7 (https://ciwqs.waterboards.ca.gov). If additional assistance is needed to establish an online CIWQS user account, contact State Water Board staff by email at [email protected]. The online user account will provide the Enrollee secure access to the online CIWQS database for electronic reporting.

2.3. Regulatory Coverage Transfer
Regulatory coverage under this General Order is not transferable to any person or party except after an existing Enrollee submits a written request for a regulatory coverage transfer to the Deputy Director, at least 60 days in advance of any proposed system ownership transfer. The written request must include a written agreement between the existing Enrollee and the new Enrollee containing:
• Acknowledgement that the transfer of ownership is solely of an existing system with an existing waste discharge identification (WDID) number; • The specific ownership transfer date in which the responsibility and regulatory coverage transfer between the existing Enrollee and the new Enrollee becomes effective; and
• Acknowledgement that the existing Enrollee is liable for violations occurring up to the ownership transfer date and that the new Enrollee is liable for violations occurring on and after the ownership transfer date.

The Deputy Director will consider approval of the written request. If approved, the Deputy Director will issue a Notice of Applicability letter which serves as an approved transfer of regulatory coverage to the new Enrollee.

3. FINDINGS

3.1. Legal Authorities

3.1.1. Federal and State Regulatory Authority
The objective of the Clean Water Act is to restore and maintain the chemical, physical, and biological integrity of the waters of the United States (33 U.S.C. 1251). The Water Code authorizes the State Water Board to implement the Clean Water Act in the State and to protect the quality of all waters of the State (Water Code sections 13000 and 13160).

3.1.2. Discharge of Sewage
A discharge of untreated or partially treated sewage is a discharge of waste as defined in Water Code section 13050(d) that could affect the quality of waters of the State and is subject to regulation by waste discharge requirements issued pursuant to Water Code section 13263 and Chapter 9, Division 3, Title 23 of the California Code of Regulations.

A discharge of sewage may pollute and alter the quality of the waters of the State to a degree that unreasonably affects the beneficial uses of the receiving water body or facilities that serve those beneficial uses (Water Code section 13050(l)(1)).

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
8 3.1.3 Water Boards Authority to Require Technical Reports, Monitoring, and Reporting Water Code sections 13267 and 13383 authorize the Regional Water Boards and the State Water Board to establish monitoring, inspection, entry, reporting, and recordkeeping requirements. Water Code section 13267(b), authorizes the Regional Water Boards to “require any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region… or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of water within its region shall furnish, under penalty of perjury, technical or monitoring reports which the regional board requires…In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports and shall identify the evidence that supports requiring that person to provide the reports.” Water Code section 13267(f) authorizes the State Water Board to require this information if it consults with the Regional Water Boards and determines that it will not duplicate the efforts of the Regional Water Boards. The State Water Board has consulted with the Regional Water Boards and made this determination.

The technical and monitoring reports required by this General Order and Attachment E (Notification, Monitoring, Reporting and Recordkeeping Requirements) are necessary to evaluate and ensure compliance with this General Order. The effort to develop required technical reports will vary depending on the system size and complexity and the needs of the specific technical report. The burden and cost of these reports are reasonable and consistent with the interest of the state in protecting water quality, which is the primary purpose of requiring the reports.

Water Code section 13383(a) authorizes the Water Boards to “establish monitoring, inspection, entry, reporting, and recordkeeping requirements… for any person who discharges, or proposes to discharge, to navigable waters, any person who introduces pollutants into a publicly owned treatment works, any person who owns or operates, or proposes to own or operate, a publicly owned treatment works or other treatment works treating domestic sewage, or any person who uses or disposes, or proposes to use or dispose, of sewage sludge.” Section 13383(b) continues, “the state board or the regional boards may require any person subject to this section to establish and maintain monitoring equipment or methods, including, where appropriate, biological monitoring methods, sample effluent as prescribed, and provide other information as may be reasonably required.”
Reporting of spills from privately owned sewer laterals and systems pursuant to section

5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) of this General Order is authorized by Water Code section 13225(c) and encouraged by the State Water Board, wherein a local agency may investigate and report on any technical factors involved in water quality control provided the burden including costs of such reports bears a reasonable relationship to the need for the report and the benefits to be obtained therefrom. The burden of reporting private spills under section 5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) is minimal and is outweighed by the benefit of providing Regional Water Boards an opportunity to respond to these spills

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
9 when an Enrollee, which in many cases has a contractual relationship with the owner of the private system, has knowledge of the spills.

3.1.4. Water Board Authority to Prescribe General Waste Discharge Requirements Water Code section 13263(i) provides that the State Water Board may prescribe general waste discharge requirements for a category of discharges if the State Water Board finds or determines that:
• The discharges are produced by the same or similar operations; • The discharges involve the same or similar types of waste; • The discharges require the same or similar treatment standards; and • The discharges are more appropriately regulated under general waste discharge requirements than individual waste discharge requirements.

Since 2006, the State Water Board has been regulating over 1,100 publicly owned sanitary sewer systems (See section 3.1.5 (Previous Statewide General Waste Discharge Requirements) of this General Order). California also has a large unknown number of unregulated privately owned sanitary sewer systems. All waste conveyed in publicly owned and privately owned sanitary sewer systems (as defined in this General Order) is comprised of untreated or partially treated domestic waste and/or industrial waste. Generally, sanitary sewer systems are designed and operated to convey waste by gravity or under pressure; system-specific design elements and system-specific operations do not change the common nature of the waste, the common threat to public health, or the common impacts on water quality. Spills of waste from a sanitary sewer system prior to reaching the ultimate downstream treatment facility are unauthorized and enforceable by the State Water Board and/or a Regional Water Board. Therefore, spills from sanitary sewer systems are more appropriately regulated under general waste discharge requirements.

As specified in Water Code sections 13263(a) and 13241, the implementation of requirements set forth in this Order is for the reasonable protection of past, present, and probable future beneficial uses of water and the prevention of nuisance. The requirements implement the water quality control plans (Basin Plans) for each Regional Water Board and take into account the environmental characteristics of sewer service areas and hydrographic units within the state. Additionally, the State Water Board has considered water quality conditions that could reasonably be achieved through the coordinated control of all factors that affect water quality, costs associated with compliance with these requirements, the need for developing housing within California, and the need to protect sources of drinking water and other water supplies.

3.1.5. Previous Statewide General Waste Discharge Requirements On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ serving as Waste Discharge Requirements pursuant to Article 4, Chapter 4, Division 7 of the Water Code (commencing with section 13260) for inadvertent discharges to waters of the State. Order 2006-0003-DWQ prohibited discharges of untreated or partially treated sewage. Order 2006-0003-DWQ also required system-specific management, operation, and maintenance of publicly owned sewer systems greater than one mile in length.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
10 To decrease the impacts on human health and the environment caused by sewage spills, the previous Order required enrollees to develop a rehabilitation and replacement plan that identifies system deficiencies and prioritizes short-term and long-term rehabilitation actions. The previous Order also required enrollees to:

1. Maintain information that can be used to establish and prioritize appropriate Sewer System Management Plan activities; and

2. Implement a proactive approach to reduce spills.

The previous Order required Sewer System Management Plan elements for “the proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management.”
On July 30, 2013, the State Water Board amended General Order 2006-0003-DWQ with Order WQ 2013-0058-EXEC, Amending Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

Many enrollees of Order 2006-0003-DWQ have already implemented proactive measures to reduce sewage spills. Other enrollees, however, still need technical assistance and funding to improve sanitary sewer system operation and maintenance for the reduction of sewage spills.

3.1.6. Existing Memorandum of Agreement with California Water Environment Association
The California Water Environment Association is a nonprofit organization dedicated to providing water industry certifications, training, and networking opportunities. The Association’s Technical Certification Program provides accredited sanitary sewer system operator certification for collection system operators and maintenance workers.

On February 10, 2016, the State Water Board entered into a collaborative agreement with the Association titled Memorandum of Agreement Between the California State Water Resources Control Board and the California Water Environment Association - Training Regarding Requirements Set Forth in Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. The Memorandum sets forth collaborative training necessary for regulated sanitary sewer system personnel to operate and maintain a well operating system and ensure full compliance with statewide sewer system regulations.

On March 15, 2018, the State Water Board and the California Water Environment Association amended the existing Memorandum of Agreement to include collaborative outreach and expand training needs associated with further updates to Water Board regulations for sanitary sewer systems. The State Water Board encourages further Agreement updates as necessary to support improved sewer system operations and the professionalism of collection system operators.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
11 3.2. General

3.2.1. Waters of the State
Waters of the State include any surface water or groundwater, including saline waters, within the boundaries of the state as defined in Water Code section 13050(e), and are inclusive of waters of the United States.

3.2.2. Sanitary Sewer System Spill Threats to Public Health and Beneficial Uses Sewage contains high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil and grease and other pollutants. Sewage spills may cause a public nuisance, particularly when sewage is discharged to areas with high public exposure such as streets and surface waters used for drinking, irrigation, fishing, recreation, or other public consumption or contact uses.

More specifically, sanitary sewer spills may:
• Adversely affect aquatic life and/or threaten water quality when reaching receiving waters;
• Inadvertently release trash, including plastics;
• Impair the recreational use and aesthetic enjoyment of surface waters by polluting surface water or groundwater;
• Threaten public health through direct public exposure to bacteria, viruses, intestinal parasites, and other microorganisms that can cause serious illness such as gastroenteritis, hepatitis, cryptosporidiosis, and giardiasis; • Negatively impact ecological receptors and biota within surface waters; and • Cause nuisance including odors, closure of beaches and recreational areas, and property damage.

Sanitary sewer system spills may pollute receiving waters and threaten beneficial uses of surface water and groundwater. Potentially threatened beneficial uses include, but are not limited to the following (with associated acronym representations as included in statewide water quality control plans and Regional Water Boards’ Basin Plans):
• Municipal and Domestic Supply (MUN)
• Water Contact Recreation (REC-1) and Non-Contact Water Recreation (REC-2) • Cold Freshwater Habitat (COLD)
• Warm Freshwater Habitat (WARM)
• Native American Culture (CUL)
• Wildlife Habitat (WILD)
• Rare, Threatened, or Endangered Species (RARE)
• Spawning, Reproduction, and/or Early Development (SPWN) • Wetland Habitat (WET)
• Agricultural Supply (AGR)
• Estuarine Habitat (EST)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
12 • Commercial and Sport Fishing (COMM)
• Subsistence Fishing (SUB)
• Tribal Tradition and Culture (CUL)
• Tribal Subsistence Fishing (T-SUB)
• Aquaculture (AQUA)
• Marine Habitat (MAR)
• Preservation of Biological Habitats of Special Significance (BIOL) • Migration of Aquatic Organisms (MIGR)
• Shellfish Harvesting (SHELL)
• Industrial Process Supply (PROC)
• Industrial Service Supply (IND)
• Hydropower Generation (POW)
• Navigation (NAV)
• Flood Peak Attenuation/Flood Water Storage (FLD)
• Water Quality Enhancement (WQE)
• Fresh Water Replenishment (FRSH)
• Groundwater Recharge (GWR)
• Inland Saline Water Habitat (SAL)

3.2.3. Proactive Sanitary Sewer System Management to Eliminate Spill Causes Finding 3 of the previous Order, 2006-0003-DWQ, states: “Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.

There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), which affect the likelihood of an SSO [sanitary sewer overflow].

A proactive approach that requires Enrollees to ensure a system-wide operation, maintenance, and management plan is in place will reduce the number and frequency of SSOs within the state. This approach will in turn decrease the risk to human health and the environment caused by SSOs.”
Many spills are preventable through proactive attention on sanitary sewer system management using the best practices and technologies available to address major causes of spills, including but not limited to:
• Blockages from sources including but not limited to:
o Fats, oils and grease;
o Tree roots;
o Rags, wipes and other paper, cloth and plastic products; and o Sediment and debris.
• Sewer system damage and exceedance of sewer system hydraulic capacity from identified system-specific environmental, and climate-change impacts, including but not limited to:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
13 o Sea level rise impacts including flooding, coastal erosion, seawater intrusion, tidal inundation and submerged lands;
o Increased surface water flows due to higher intensity rain events; o Flooding;
o Wildfires and wildfire induced impacts;
o Earthquake induced damage;
o Landslides; and
o Subsidence.
• Infrastructure deficiencies and failures, including but not limited to:
o Pump station mechanical failures;
o System age;
o Construction material failures;
o Manhole cover failures;
o Structural failures; and
o Lack of proper operation and maintenance.
• Insufficient system capacity (temporary or sustained), due to factors including but not limited to:
o Excessive and/or increased storm or groundwater inflow/infiltration; o Insufficient capacity due to population increase and/or new connections from industrial, commercial and other system users; and
o Stormwater capture projects utilizing a sanitary sewer system to convey stormwater to treatment facilities for reuse.
• Community impacts, including but not limited to:
o Power outages;
o Vandalism; and
o Contractor-caused or other third party-caused damages.

3.2.4. Underground Sanitary Sewer System Leakage
Portions of some sanitary sewer systems may leak, causing underground exfiltration (exiting) of sewage from the system. Exfiltrated sewage that remains in the underground infrastructure trench and/or the soil matrix, and that does not discharge into waters of the State (surface water or groundwater) may not threaten beneficial uses.

Underground exfiltrated sewage may threaten beneficial uses if discharged to waters of the State. Exfiltrated sewage that discharges to groundwater may impact beneficial uses of groundwater and pollute groundwater supply. Additionally, if in close proximity, exfiltrated sewage may enter into a compromised underground drainage conveyance system that discharges into a water of the United States, or into groundwater that is hydrologically connected to (feeds into) a water of the United States, thus potentially causing: (1) a Clean Water Act violation, (2) threat and impact to beneficial uses, and/or (3) surface water pollution.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
14 3.2.5. Proactive Sanitary Sewer System Management to Reduce Inflow and Infiltration Excessive inflow (stormwater entering) and infiltration (groundwater seepage entering) to sanitary sewer systems is preventable through proactive sewer system management using the best practices and technologies available. The efficiency of the downstream wastewater treatment processes is dependent on the performance of the sanitary sewer system. When the structural integrity of a sanitary sewer system deteriorates, high volumes of inflow and infiltration can enter the sewer system. High levels of inflow and infiltration increase the hydraulic load on the downstream treatment plant, which can reduce treatment efficiency, lead to bypassing a portion of the treatment process, cause illegal discharge of partially treated effluent, or in extreme situations make biological treatment facilities inoperable (e.g., wash out the biological organisms that treat the waste).

3.3. Water Quality Control Plans, Policies and Resolutions The nine Regional Water Boards have adopted region-specific water quality control plans (commonly referred to as Basin Plans) that designate beneficial uses, establish water quality objectives, and contain implementation programs and policies to achieve those objectives. The State Water Board has adopted statewide water quality control plans, policies and resolutions establishing statewide water quality objectives, implementation programs and initiatives.

3.3.1. State Water Board Antidegradation Policy
On October 28, 1968, the State Water Board adopted Resolution 68-16, titled Statement of Policy with Respect to Maintaining High Quality of Waters in California, which incorporates the federal antidegradation policy. Resolution 68-16 requires that existing water quality be maintained unless degradation is justified based on specific findings.

The continued prohibition of sewage discharges from sanitary sewer systems into waters of the State aligns with Resolution 68-16. A sewage discharge from sanitary sewers to waters of the State is prohibited by this Order. Therefore, this Order does not allow degradation of waters of the State. In addition, this Order: (1) further expands the existing prohibition of sewage discharges to include waters of the State, in addition to waters of the United States as provided in previous Order 2006-0003-DWQ, and (2) enhances the ability for Water Board enforcement of violations of the established prohibitions.

3.3.2. State Water Board Sources of Drinking Water Policy On May 19,1988, the State Water Board adopted Resolution 88-63 (amended on February 1, 2006), titled Sources of Drinking Water, establishing state policy that all waters of the State, with certain exceptions, are suitable or potentially suitable for municipal or domestic supply.

3.3.3. State Water Board Cost of Compliance Resolution
On September 24, 2013, the State Water Board adopted Resolution 2013-0029, titled Directing Actions in Response to Efforts by Stakeholders on Reducing Costs of

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
15 Compliance While Maintaining Water Quality Protection. Through this resolution, the State Water Board committed to continued stakeholder engagement in identifying and implementing measures to reduce costs of compliance with regulatory orders while maintaining water quality protection and improving regulatory program outcomes.

3.3.4. State Water Board Human Right to Water Resolution On February 16, 2016, the State Water Board adopted Resolution 2016-0010, titled Adopting the Human Right to Water as a Core Value and Directing its Implementation in Water Board Programs and Activities, addressing the human right to water as a core value and directing Water Board programs to implement requirements to support safe drinking water for all Californians.

On November 16, 2021, the State Water Board adopted Resolution 2021-0050 titled Condemning Racism, Xenophobia, Bigotry, and Racial Injustice, and Strengthening Commitment to Racial Equity, Diversity, Inclusion, Access, and Anti-racism. Among other actions, through Resolution 2021-0050, the State Water Board, in summary as corresponding to this General Order, reaffirms its commitment to its Human Right to Water resolution, upholding that every human being in California deserves safe, clean, affordable, and accessible water for human consumption, cooking, and sanitation purposes. Resolution 2021-0050 provides the State Water Board commitment to:
• Protect public health and beneficial uses of waterbodies in all communities, including communities disproportionately burdened by wastes discharge of waste to land and surface water;
• Restore impaired surface waterbodies and degraded aquifers; and • Promote multi-benefit water quality projects.

Through Resolution 2021-0050, the State Water Board also commits to expanding implementation of its Climate Change Resolution to address the disproportionate effects of extreme hydrologic conditions and sea-level rise on Black, Indigenous, and people of color communities, prioritizing:
• The right to safe, clean, affordable, and accessible drinking water and sanitation; • Sustainable management and protection of local groundwater resources; • Healthy watersheds; and
• Access to surface waterbodies that support subsistence fishing.

On June 7, 2022, the State Water Board adopted a Resolution, titled Authorizing the Executive Director or Designee to Enter into One or More Multi-Year Contracts Up to a Combined Sum of $4,000,000 for a Statewide Wastewater Needs Assessment, supporting the equitable access to sanitation for all Californians and implementation of Resolutions 2016-0010 and 2021-0050.

This General Order supports the State Water Board priority in collecting a comprehensive set of data for California’s wastewater systems, including sanitary sewer systems. Data reported per the requirements of this Order will be used with data from other Water Boards’ programs, to further develop criteria and create a statewide risk

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
16 framework to prioritize critical funding and infrastructure investments for California’s most vulnerable populations, including disadvantaged or severely disadvantaged communities with inadequate or failing sanitation systems and threatened access to healthy drinking water supplies.

3.3.5. State Water Board Open Data Resolution
On July 10, 2018, the State Water Board adopted Resolution 2018-0032, titled Adopting Principles of Open Data as a Core Value and Directing Programs and Activities to Implement Strategic Actions to Improve Data Accessibility and Associated Innovation, directing regulatory programs to assure all monitoring and reporting requirements support the State Water Boards’ Open Data Initiative.

3.3.6. State Water Board Response to Climate Change
On March 7, 2017, the State Water Board adopted Resolution 2017-0012, titled Comprehensive Response to Climate Change, requiring a proactive response to climate change in all California Water Board actions, with the intent to embed climate change consideration into all programs and activities.

3.4. California Environmental Quality Act
The adoption of this Order is an action to reissue general waste discharge requirements that is exempt from the California Environmental Quality Act (Public Resources Code section 21000 et seq.) because it is an action taken by a regulatory agency to assure the protection of the environment and the regulatory process involves procedures for protection of the environment (Cal. Code Regs., Title 14, section 15308). In addition, the action to adopt this Order is exempt from CEQA pursuant to Cal. Code Regs., Title 14, section 15301, to the extent that it applies to existing sanitary sewer collection systems that constitute “existing facilities” as that term is used in sections 15301 and 15302, to the extent that it results in the repair or replacement of existing systems involving negligible or no expansion of capacity.

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders
The State Water Board, Division of Financial Assistance administers the implementation of the State Water Board financial assistance programs, per Board-adopted funding policies. Among other funding areas, the Division administers loan and grant funding for the planning and construction of wastewater and water recycling facilities per funding program-specific policies and guidelines. Applicants may apply for Clean Water State Revolving Fund low-interest loan, Small Community Wastewater grant funding assistance, and other funding available at the time of application, for some of the costs associated with complying with this General Order.

Funding applicants may obtain further information regarding current funding opportunities, and Division of Financial Assistance staff contact information at the following website: Financial Assistance Funding - Grants and Loans | California State Water Resources Control Board.
(https://www.waterboards.ca.gov/water_issues/programs/grants_loans/)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
17 Section 13477.6 of the Water Code authorizes the Small Community Grant Fund.

The Small Community Grant Fund allows the State Water Board to provide grant funding assistance to small, disadvantaged communities and small severely disadvantaged communities that may not otherwise be able to afford a loan or similar financing for projects to comply with requirements of this General Order. The State Water Board also considers loan forgiveness on a disadvantaged community-specific basis.

For disadvantaged communities’ wastewater needs, the State Water Board places priority on the funding of projects that address:
• Public health;
• Violations of waste discharge requirements and National Pollutant Discharge Elimination System (NPDES) permits;
• Providing sewer system service to existing septic tank owners; and • High priority public health and water quality concerns identified by a Regional Water Board.

3.6. Notification to Interested Parties
On January 31, 2022, the State Water Board notified interested parties and persons of its intent to reissue Sanitary Sewer Systems General Order 2006-0003-DWQ by issuing a draft General Order for a 60-day public comment period. State Water Board staff conducted extensive stakeholder outreach and encouraged public participation in the adoption process for this General Order. On March 15, 2022, the State Water Board held a public meeting to hear and consider oral public comments. The State Water Board considered all public comments prior to adopting this General Order.

THEREFORE, IT IS HEREBY ORDERED, that pursuant to Water Code sections 13263, 13267, and 13383 this General Order supersedes Order 2006-0003-DWQ, Order WQ 2013-0058-EXEC, and any amendments made to these Orders thereafter, except for enforcement purposes and to meet the provisions contained in Division 7 of the Water Code (commencing with section 13000) and regulations adopted thereunder, and the provisions of the Clean Water Act and regulations and guidelines adopted thereunder, the Enrollee shall comply with the requirements in this Order.

4. PROHIBITIONS

4.1 Discharge of Sewage from a Sanitary Sewer System
Any discharge from a sanitary sewer system that has the potential to discharge to surface waters of the State is prohibited unless it is promptly cleaned up and reported as required in this General Order.

4.2. Discharge of Sewage to Waters of the State
Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
18 4.3. Discharge of Sewage Creating a Nuisance
Any discharge from a sanitary sewer system that creates a nuisance or condition of pollution as defined in Water Code section 13050(m) is prohibited.

5. SPECIFICATIONS

5.1. Designation of a Legally Responsible Official
The Enrollee shall designate a Legally Responsible Official that has authority to ensure the enrolled sanitary sewer system(s) complies with this Order, and is authorized to serve as a duly authorized representative. The Legally Responsible Official must have responsibility over management of the Enrollee’s entire sanitary sewer system, and must be authorized to make managerial decisions that govern the operation of the sanitary sewer system, including having the explicit or implicit duty of making major capital improvement recommendations to ensure long-term environmental compliance.

The Legally Responsible Official must have or have direct authority over individuals that:
• Possess a recognized degree or certificate related to operations and maintenance of sanitary sewer systems, and/or
• Have professional training and experience related to the management of sanitary sewer systems, demonstrated through extensive knowledge, training and experience.

For example, a sewer system superintendent or manager, an operations manager, a public utilities manager or director, or a district engineer may be designated as a Legally Responsible Official.

The Legally Responsible Official shall complete the electronic CIWQS “User Registration” form (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp). A Legally Responsible Official that represents multiple enrolled systems shall complete the electronic CIWQS “User Registration” form for each system.

The Enrollee shall submit any change to its Legally Responsible Official, and/or change in contact information, to the State Water Board within 30 calendar days of the change by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.2. Sewer System Management Plan Development and Implementation To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan.

The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effective, the Sewer System Management Plan must include procedures for the management, operation, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
19 prioritization of system repairs and maintenance to proactively prevent spills, and (2) address the implementation of current standard industry practices through available equipment, technologies, and strategies.

For an existing Enrollee under Order 2006-0003-DWQ that has certified its Continuation of Existing Regulatory Coverage, per section 2.1 (Requirements for Continuation of Existing Regulatory Coverage) of this General Order:

Within six (6) months of the Adoption Date of this General Order:
• The Legally Responsible Official shall upload the Enrollee’s existing Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

For a new Enrollee:

Within twelve (12) months of the Application for Enrollment approval date:
• The governing entity of the new Enrollee shall approve its Sewer System Management Plan; and
• The Legally Responsible Official shall certify and upload its Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

5.3. Certification of Sewer System Management Plan and Plan Updates The Legally Responsible Official shall certify and upload its Sewer System Management Plan and all subsequent updates to the online CIWQS Sanitary Sewer System Database.

5.4. Sewer System Management Plan Audits
The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.

Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.

The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills;
• Evaluate the Enrollee’s compliance with this General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
20 • Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.

The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions;
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule for the Enrollee to address the identified deficiencies.

A new Enrollee of this General Order (that did not have a sanitary sewer system enrolled in the previous State Water Board Order 2006-0003-DWQ) shall conduct its first internal Sewer System Management Plan audit for the time period between the date of submittal of its certified Sewer System Management Plan and the third subsequent December 31st date. The audit report must be submitted into the online CIWQS Sanitary Sewer System Database by July 1 of the following calendar year.

See the following tables for clarification:

Initial Audit Period and Audit Due Date for New Enrollees Audit Period Audit Due Date
New Enrollee
Certified Sewer System Management
Plan Submittal Date
through
the third subsequent December 31
st date
July 1
st date after
audit period
Example
Certified Sewer System Management
Plan Submittal Date of August 2, 2025
Audit Period of August 2, 2025 through
December 31, 2027
July 1, 2028

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
21 Initial Audit Period for Transition from 2-Year Audit Required in Previous Order 2006-0003-DWQ to 3-Year Audit Required in this General Order Audit Period Audit Due Date
An Enrollee
previously
regulated by Order
2006-003-DWQ
A 3-year period starting from the end of
last required 2-year Audit Period
Within six months
after end of 3-year
Audit Period
Example
Last required Audit Period start date of
August 2, 2021;
Audit Period of August 2, 2021 through
August 1, 2024
February 1, 2025
Three-Year Ongoing Audit Period
Audit Period Audit Due Date
Each Enrollee A 3-year period starting from the end of
last required Audit Period
Within six months
after end of 3-year
Audit Period

5.5. Six-Year Sewer System Management Plan Update
At a minimum, the Enrollee shall update its Sewer System Management Plan every six (6) years after the date of its last Plan Update due date. (For an Enrollee previously regulated by Order 2006-0003-DWQ, the six-year period shall commence on the due date identified in section 3.11 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this Order. The Updated Sewer System Management Plan must include:
• Elements required in Attachment D (Sewer System Management Plan – Required Elements) of this Order;
• Summary of revisions included in the Plan update based on internal audit findings; and
• Other sewer system management-related changes.

The Enrollee’s governing entity shall approve the updated Plan. The Legally Responsible Official shall upload and certify the approved updated Plan in the online CIWQS Sanitary Sewer System Database in accordance with section 3.11 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order. During the time period in between Plan updates, the Enrollee shall continuously document changes to its Sewer System Management Plan in a change log attached to the Plan.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
22 5.6. System Resilience
The Enrollee shall include and implement system-specific procedures in its Sewer System Management Plan to proactively prioritize: (1) operation and maintenance, (2) condition assessments, and (3) repair and rehabilitation, to address ongoing system resilience, as specified in Attachment D (Sewer System Management Plan – Required Elements) of this General Order.

5.7. Allocation of Resources
The Enrollee shall:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementation of its updated Sewer System Management Plan, o System operation, maintenance, and repair, and
o Spill responses.

5.8. Designation of Data Submitters
The Legally Responsible Official may designate one or more individuals as a Data Submitter for reporting of spill data. The Legally Responsible Official shall authorize the designation of Data Submitter(s) through the online CIWQS database (https://ciwqs.waterboards.ca.gov) prior to the individuals establishing a CIWQS user account (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp) and entering spill data into the online CIWQS Sanitary Sewer System Database.

The Legally Responsible Official shall submit any change to its Data Submitter(s), and/or change in Data Submitter contact information, to the State Water Board within 30 calendar days of the change, by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.9. Reporting Certification
The Legally Responsible Official shall electronically certify, on the Enrollee’s behalf, all applications, reports, the Sewer System Management Plan(s) and corresponding updates, and other information submitted electronically into the online CIWQS Sanitary Sewer System Database, as follows:
“I certify under penalty of perjury under the laws of the State of California that the electronically submitted information was prepared under my direction or supervision.

Based on my inquiry of the person(s) directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete, and complies with the Statewide Sanitary Sewer Systems General Order.

I am aware that there are significant penalties for submitting false information.”

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
23 Hardcopy submittals to the State Water Board must be accompanied by the above certification statement.

5.10. System Capacity
The Enrollee shall maintain the system capacity necessary to convey: (1) base flows during dry weather conditions, and (2) wet weather peak flows consistent with designated local historic storms. Design storms must take into account system-specific stormwater contributions via inflow and infiltration, and location-specific depth of groundwater and storm frequencies. The Enrollee shall implement capital improvements to provide adequate hydraulic capacity to:
• Meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance element of its Sewer System Management Plan; and • Prevent system capacity-related spills, and adverse impacts to the treatment efficiency of downstream wastewater treatment facilities.

5.11. System Performance Analysis
The Enrollee shall include a running 10-year system performance analysis in its Annual Report. The analysis must include two CIWQS-generated graphs presenting the following information:

Graph 1 – Total Spill Volume per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total spill volume, per Spill Category, for each calendar year.

Graph 2 – Total Number of Spills per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total number of spills, per Spill Category, for each calendar year.

The current calendar year is the calendar year covered in the Annual Report.

The Enrollee shall generate the graphs in CIWQS, using the existing data in the online CIWQS Sanitary Sewer System Database at the following graph generation link:
(https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?reportActio n=criteria&reportId=sso_operation_report).

5.12. Spill Emergency Response Plan and Remedial Actions For Existing Enrollees (with regulatory coverage under Order 2006-0003-DWQ):

Within six (6) months of the Adoption Date of this General Order, the Enrollee shall update and implement its Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
24 For New Enrollees:

Within six (6) months of the Application for Enrollment approval date, the Enrollee shall develop and implement a Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

The Enrollee shall certify, in its Annual Report, that its Spill Emergency Response Plan is up to date.

The Spill Emergency Response Plan shall include measures to protect public health and the environment. The Enrollee shall respond to spills from its system(s) in a timely manner that minimizes water quality impacts and nuisance by:
• Immediately stopping the spill and preventing/minimizing a discharge to waters of the State;
• Intercepting sewage flows to prevent/minimize spill volume discharged into waters of the State;
• Thoroughly recovering, cleaning up and disposing of sewage and wash down water; and
• Cleaning publicly accessible areas while preventing toxic discharges to waters of the State.

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements The Enrollee shall comply with notification, monitoring, reporting, and recordkeeping requirements in Attachment E1 of this General Order.

5.13.1. Spill Categories
Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:
• Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or
o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
25 A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section

3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. • Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.
• Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

5.13.2. Annual Report
The Enrollee shall submit an Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

For new Enrollees: Within 30 days of obtaining a CIWQS account, a new Enrollee shall submit its initial Annual Report, as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
26 5.14. Electronic Sanitary Sewer System Service Area Boundary Map For continuing enrollees, starting on July 1, 2025, and no later than December 31, 2025:

For new enrollees – no earlier than July 1, 2025, or within 12 months of the Application for Enrollment approval date, whichever date is later:

The Legally Responsible Official shall submit, to the State Water Board, geospatial data detailing the locations of the Enrollee’s sanitary sewer system service area boundary, per the required content and specifications in section 3.8 (Electronic Sanitary Sewer System Service Area Boundary Map) of Attachment E1 of this General Order, for each system identified by a WDID number.

An Enrollee of a disadvantaged community that may need assistance developing an electronic map to comply with this requirement, may contact State Water Board staff for assistance at [email protected].

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems
Within 24 hours of becoming aware of a spill (as described below) from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to report the following observations to the online CIWQS Sanitary Sewer System Database at the following link:
https://ciwqs.waterboards.ca.gov:
• A spill equal or greater than 1,000 gallons that discharges (or has a potential to discharge) to a water of the State, or a drainage conveyance system that discharges to waters of the State; or
• Any volume of sewage that discharges (or has a potential to discharge) to surface waters.

In the CIWQS module, the Enrollee is encouraged to identify:
• Time of observation;
• Description of general spill location (for example, street name and cross street names);
• Estimated volume of spill;
• If known, general description of spill destination (for example, flowing into drainage channel, flowing directly into a creek, etc.); and
• If known, name of private system owner/operator.

The CIWQS database will make the name and contact information of the entity voluntarily reporting a private spill, accessible to State and Regional Water Board staff only. The CIWQS database will only make information regarding the actual spill, accessible to the public.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
27 5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services
Upon observing or acquiring knowledge of any of the following from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to notify the California Office of Emergency Services (as provided by Health and Safety Code section 5410 et. seq. and Water Code section 13271), or inform the responsible party that State law requires such notification to the Office of Emergency Services by any person that causes or allows a sewage discharge to waters of the State:
• A spill equal to 1,000 gallons or more that discharges (or has a potential to discharge) to waters of the State, or a drainage conveyance system that discharges to waters of the State; or
• A spill of any volume to surface waters.

5.17. Unintended Failure to Report
If an Enrollee becomes aware that they unintentionally failed to submit relevant facts in any report required in this General Order, the Enrollee shall promptly notify Regional Water Board and State Water Board staff. Regional Water Board contact information is included in Attachment F of this Order. State Water Board staff shall be contacted by email at [email protected] for assistance in formally amending the corresponding report(s) in the online CIWQS Sanitary Sewer System Database.

5.18. Duty to Report to Water Boards
In accordance with Water Code section 13267 and/or section 13383, upon request by the State Water Board Executive Director (or designee) or a Regional Water Board Executive Officer (or designee), the Enrollee shall provide the requested information which the State or Regional Water Board deems necessary to determine compliance with this General Order.

5.19. Operation and Maintenance
To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.

6. PROVISIONS

6.1. Enforcement Provisions
The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.

6.1.1. Enforceability of Clean Water Act and Water Code Violations Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order constitutes a violation of the Water Code and a potential

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
28 violation of the Clean Water Act and is grounds for an enforcement action by the State Water Board or the applicable Regional Water Board. Failure to comply with the notification, monitoring, inspection, entry, reporting, and recordkeeping requirements may subject the Enrollee to administrative civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the Enrollee to administrative civil liabilities up to $10,000 a day per violation and additional liability up to $10 per gallon of discharge not cleaned up after the first 1,000 gallons of discharge; up to $5,000 a day per violation pursuant to Water Code section 13350 or up to $20 per gallon of waste discharged; or referral to the Attorney General for judicial civil enforcement.

6.1.2. Monetary Penalties
The Water Code provides the State and Regional Water Boards the authority to pursue formal enforcement actions, including imposing administrative liability and civil monetary penalties, for non-compliance with the requirements of this General Order and violations of the Clean Water Act.

6.1.3. Falsifying or Failure to Report
The Water Code provides that any person failing or refusing to furnish technical or monitoring program reports, as required under this General Order, or falsifying any information provided in the technical or monitoring reports is subject to administrative liability and civil monetary penalties. Any person who knowingly fails or refuses to furnish technical or monitoring program reports or falsifies any information provided in reports required by this General Order is subject to criminal penalties.

6.1.4. Severability of General Order
The provisions of this General Order are severable; if any provision of this Order, or the application of any provision of this Order to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Order shall not be affected thereby.

6.1.5. Indirect Discharges
In the event that a spill enters into a drainage conveyance system, the Enrollee shall take all feasible steps to prevent discharge of sewage into waters of the State by blocking or redirecting the flow in the drainage conveyance system, removing the sewage from the drainage conveyance system, and cleaning the system in a manner that does not inadvertently impact beneficial uses of the receiving water body.

6.1.6. Water Boards’ Considerations for Discretionary Enforcement Consistent with the State Water Board Enforcement Policy, when considering Water Code section 13327 factors, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to contain, control, clean up, and mitigate spills. In assessing the factors, the State Water Board or the applicable Regional Water Board will consider:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
29 • The Enrollee’s compliance with this General Order with a focus on compliance with reporting requirements;
• The Enrollee’s provision of adequate funding to implement the requirements of this General Order;
• The Enrollee’s compliance with providing a complete and updated Sewer System Management Plan;
• The Enrollee’s compliance with implementing its Sewer System Management Plan; • The overall effectiveness of the Enrollee’s Sewer System Management Plan with respect to:
o System management, operation, and maintenance,
o Adequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent spills (e.g. adequately enlarging treatment or collection facilities to accommodate growth, infiltration and inflow, etc.),
o Preventive maintenance (including cleaning, root grinding, and fats, oils, and grease control) and source control measures,
o Implementation of backup equipment,
o Inflow and infiltration prevention and control,
o Appropriate sanitary sewer system capacity to prevent spills, and o The Enrollee’s responsiveness to stop and mitigate the impact of the discharge; • The Enrollee’s compliance with identifying the cause of the spill; • The Enrollee’s use of available information and observations to accurately estimate the spill volume and identify the affected or potentially affected receiving waters; • The Enrollee’s thoroughness of cleaning up sewage in drainage conveyance systems after the spill(s);
• The Enrollee’s use of water quality and biological monitoring and assessment to determine the short-term and long-term impacts to beneficial uses and the environment;
• The Enrollee’s follow up actions to improve system performance; • The Enrollee’s implementation of feasible alternatives to prevent spills, such as:
o Use of temporary storage or waste retention,
o Reduction of system inflow and infiltration,
o Collection and hauling of waste to a treatment facility, o Prevention of and/ or containment of spills due to a design storm event identified in the Enrollee’s Sewer System Management Plan,

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
30 o Implementation of available equipment, technologies, strategies, and recommended industry practices for maintaining and managing sewer systems to prevent spills, and contain and eliminate discharges to waters of the State; and • The spill duration and factors beyond the reasonable control of the Enrollee causing the event.

6.1.7. Enforcement Discretion Based on Reporting Compliance Consistent with the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to comply with spill reporting requirements when determining compliance with Water Code section 13267 and section 13383. When assessing Water Code section 13227 factors, the State Water Board or the applicable Regional Water Board will consider:
• The Enrollee’s diligence to comply with all reporting requirements in this General Order;
• The use of best available information for the Enrollee’s reporting of spill start date and start time in which the release of sewage from the sanitary sewer system initiated;
• The Enrollee’s reporting of spill end date, and end time to be the date and time in which the release of sewage from the sanitary sewer system was stopped; • The Enrollee’s diligence to accurately estimate and report spill volumes; • The Enrollee’s subsequent verification and/or updates to initial Draft Spill Reports in accordance with this General Order; and
• The Enrollee’s timely certification of required spill reports.

Consistent with Water Code section 13267 and section 13383, the State Water Board or a Regional Water Board may require an Enrollee to report the results of a condition assessment of a specified portion of the Enrollee’s sanitary sewer system.

6.2. Other Regional Water Board Orders
It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with federal and state regulations. This Order will not be interpreted or applied:
• In a manner inconsistent with the federal Clean Water Act; • To authorize a spill or discharge that is illegal under either the Clean Water Act, the Water Code, and/or an applicable Basin Plan prohibition or water quality standard; • To prohibit a Regional Water Board from issuing an individual National Pollutant Discharge Elimination System (NPDES) permit or individual waste discharge requirements superseding an Enrollee’s regulatory coverage under this General Order for a sanitary sewer system authorized under the Clean Water Act or Water Code;

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
31 • To supersede any more specific or more stringent waste discharge requirements or enforcement orders issued by a Regional Water Board; or • To supersede any more specific or more stringent state or federal requirements in existing regulation, an administrative/judicial order, or Consent Decree.

6.3. Sewer System Management Plan Availability
The Enrollee’s updated Sewer System Management Plan must be maintained for public inspection at the Enrollee’s offices and facilities and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with section 3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

6.4. Entry and Inspection

6.4.1. Entry and Availability of Information
The Enrollee shall allow State and Regional Water Board staff, upon presentation of credentials and other documents as may be required by law, to:
• Enter upon the Enrollee’s premises where a regulated facility or activity is located or conducted, or where records are kept under the requirements of this General Order; • Have access to and reproduce any records required to be maintained by this General Order;
• Inspect any facility and/or equipment (including monitoring and control equipment), practices, or operations required in this General Order; and • Sample or monitor substances or parameters for assuring compliance with this General Order, or as otherwise authorized by the Water Code.

6.4.2. Pre-Inspection Questionnaire
The Enrollee shall provide pre-inspection information to State and Regional Water Board staff through the completion of a Pre-Inspection Questionnaire provided by Water Board staff.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 1

ATTACHMENT A - DEFINITIONS
Annual Report
An Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) is a mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

Basin Plan
A Basin Plan is a water quality control plan specific to a Regional Water Quality Control Board (Regional Water Board), that serves as regulations to: (1) define and designate beneficial uses of surface and groundwaters, (2) establish water quality objectives for protection of beneficial uses, and (3) provide implementation measures.

Beneficial Uses
The term “Beneficial Uses” is a Water Code term, defined as the uses of the waters of the State that may be protected against water quality degradation. Examples of beneficial uses include but are not limited to, municipal, domestic, agricultural and industrial supply; power generation; recreation; aesthetic enjoyment; navigation; and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.

California Integrated Water Quality System (CIWQS)
CIWQS is the statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter
A Data Submitter is an individual designated and authorized by the Enrollee’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database.

Disadvantaged Community
A disadvantaged community is a community with a median household income of less than eighty percent (80%) of the statewide annual median household income.

For the purpose of this General Order, there is no differentiation between a small and large disadvantaged community.

Drainage Conveyance System
A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 2
Enrollee
An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
• greater than one (1) mile in length (each individual sanitary sewer system); • one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Environmentally Sensitive Area
An environmentally sensitive area is a designated agricultural and/or wildlife area identified to need special natural landscape protection due to its wildlife or historical value.

Exfiltration
Exfiltration is the underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Flood Control Channel
A flood control channel is a channel used to convey stormwater and non-stormwater flows through and from areas for flood management purposes.

Governing Entity
A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board;
• A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.

Hydrologically Connected
Two waterbodies are hydrologically connected when one waterbody flows, or has the potential to flow, into the other waterbody. For the purpose of this General Order, groundwater is hydrologically connected to a surface water when the
groundwater feeds into the surface water. (The surface
waterbody in this example is termed a gaining stream as it gains flow from surrounding groundwater.)
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 3
Lateral (including Lower and Upper Lateral)
A lateral is an underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership.

A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations.

An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

Legally Responsible Official
A Legally Responsible Official is an official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by this General Order.

Nuisance
For the purpose of this General Order, a nuisance, as defined in Water Code section 13050(m), is anything that meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property; • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; and
• Occurs during, or as a result of, the treatment or disposal of wastes.

Private Sewer Lateral
A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.

Private Sanitary Sewer System
A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.

Potential to Discharge, Potential Discharge
Potential to Discharge, or Potential Discharge, means any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 4
Receiving Water
A receiving water is a water of the State that receives a discharge of waste.

Resilience
Resilience is the ability to recover from or adjust to adversity or change, and grow from disruptions. Resilience can be built through planning, preparing for, mitigating, and adapting to changing conditions.

Sanitary Sewer System
A sanitary sewer system is a system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of this Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System
A satellite sewer system is a portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan
A sewer system management plan is a living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with this General Order.

Sewage
Sewage, and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill
A spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under this General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Training
Training is in-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with this General Order.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT A – DEFINITIONS December 6, 2022
A - 5
Wash Down Water
Wash down water is water used to clean a spill area.

Waste
Waste, as defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID)
A waste discharge identification number (WDID) identifies each individual sanitary sewer system enrolled under this General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State
Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions.

Waters of the State include waters of the United States.

Waters of the United States
Waters of the United States are surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective
A water quality objective is the limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 1
ATTACHMENT B – APPLICATION FOR ENROLLMENT

1. Enrollment Status: (Mark only one item)
☐ New Enrollee
☐ New Enrollee with previous regulatory coverage under Order 2006-0003-DWQ (that failed to certify continuation of coverage in CIWQS per Order 2022-XXXX-DWQ) Existing WDID Number: __________________________________________________

2. Applicant Information:

Legally Responsible Official Submitting Application
First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ System Owner/Operator Name: ______________________________________________ Mailing Address:________________________________________________________ City, State, Zip:_________________________________________________________ County: _______________________________________________________________ Sanitary Sewer System Name: ____________________________________________ Regional Water Quality Control Board(s): ____________________________________ Signature and Date: _____________________________________________________

3. Applicant Type (Check one):
☐ City ☐ County ☐ State ☐ Federal ☐ Special District
☐ Government Combination ☐ Private ☐ Other Non-governmental Entity

4. Wastewater Treatment Plant Receiving Sanitary Sewer System Waste:

Wastewater Treatment Plant Permittee:________________________________________ WDID No.: ______________________________________________________________ STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 2

5. Billing Information
Billing Address: ___________________________________________________________ City, State, Zip: ___________________________________________________________ Billing Contact Person and Title: ______________________________________________ Phone and Email Address: __________________________________________________

6. Application Fee:

The application fee, as required by Water Code section 13260, is based on the daily population served by the sanitary sewer system. See updated Fee Schedule. (https://www.waterboards.ca.gov/resources/fees/water_quality/) Check one of the following and enter fee amount:
☐ Population Served < 50,000 – Total Fee submitted: $ ___________ ☐ Population Served ≥ 50,000 – Total Fee submitted: $ ___________ Make the fee payment payable to the State Water Resources Control Board and mail the complete application package to:

State Water Resources Control Board, Accounting Office
P. O. Box 1888
Sacramento, CA 95812-1888
Attention: Statewide Sanitary Sewer System Program

7. Application Submittal Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge and belief, the information in the submitted application package is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 1

ATTACHMENT C - NOTICE OF TERMINATION

1. Enrollee Information
Enrollee Name: ___________________________________________________________ WDID No:________________________________________________________________ Legally Responsible Official Requesting Termination of Coverage: ___________________ First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ Mailing Address: __________________________________________________________ City, State, Zip: ___________________________________________________________ County: _________________________________________________________________ Sanitary Sewer System Name(s) or Unique Identifier(s): ___________________________ Regional Water Quality Control Board(s): _______________________________________ Signature and Date:________________________________________________________

2. Basis of Termination
Explanation of termination, including subsequent regulatory coverage and subsequent owner/operator of enrolled sanitary sewer system, as applicable:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 2

3. Regulatory Coverage Termination Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge: 1) the sanitary sewer system I officially represent is not required to be regulated under the Statewide Waste Discharge Requirements for Sanitary Sewer Systems Order 2022-XXXX-DWQ, and 2) the information submitted in this Notice of Termination is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. Additionally, I understand that the submittal of this Notice of Termination does not release sanitary sewer system agencies from liability for any violations of the Clean Water Act.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________Date: ________________ For State Water Board Use Only
☐ Approved for Termination ☐ Denied and Returned to Enrollee Deputy Director of Water Quality Signature: _____________________________________ Date: ____________________Notice of Termination Effective Date: __________________ STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 1
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS Table of Contents

1. Sewer System Management Plan Goal And Introduction ............................................D-2

1.1. Regulatory Context ...........................................................................................D-2

1.2. Sewer System Management Plan Update Schedule.........................................D-3

1.3. Sewer System Asset Overview .........................................................................D-3

2. Organization ................................................................................................................D-3

3. Legal Authority.............................................................................................................D-4

4. Operation And Maintenance Program..........................................................................D-4

4.1. Updated Map of Sanitary Sewer System ..........................................................D-4

4.2. Preventive Operation and Maintenance Activities .............................................D-4

4.3. Training .............................................................................................................D-5

4.4. Equipment Inventory .........................................................................................D-5

5. Design And Performance Provisions ...........................................................................D-5

5.1. Updated Design Criteria and Construction Standards and Specifications.........D-5

5.2. Procedures and Standards................................................................................D-5

6. Spill Emergency Response Plan..................................................................................D-6

7. Sewer Pipe Blockage Control Program........................................................................D-7

8. System Evaluation, Capacity Assurance and Capital Improvements...........................D-7

8.1 System Evaluation and Condition Assessment.................................................D-7

8.2. Capacity Assessment and Design Criteria ........................................................D-8

8.3. Prioritization of Corrective Action ......................................................................D-9

8.4. Capital Improvement Plan.................................................................................D-9

9. Monitoring, Measurement and Program Modifications.................................................D-9

10. Internal Audits............................................................................................................D-10

11. Communication Program ...........................................................................................D-10 STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 2
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS A Sewer System Management Plan (Plan) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This Plan may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.

The Enrollee’s development, update, and implementation of a Sewer System Management Plan addressing the requirements of this Attachment is an enforceable component of this General Order. As specified in Provision 6.1 (Enforcement Provisions) of this General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective Sewer System Management Plan to prevent, contain, control, and mitigate spills when considering Water Code section 13327 factors to determine necessary enforcement of this General Order.

This Attachment includes the following required elements that the Enrollee shall address in its Plan and subsequent updates. The Enrollee shall identify any requirement in this Attachment that is not applicable to the Enrollee’s sewer system and shall explain in its Plan why the requirement is not applicable.

1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.

The Plan must include a narrative Introduction section that discusses the following items:

1.1. Regulatory Context
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 3

1.2. Sewer System Management Plan Update Schedule
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.

1.3. Sewer System Asset Overview
The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons; • Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and
• Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s upto-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.

2. ORGANIZATION
The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order; • The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 4
health officer, county environmental health agency, and State Office of Emergency Services.)

3. LEGAL AUTHORITY
The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; • Require that sewer system components and connections be properly designed and constructed;
• Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

4. OPERATION AND MAINTENANCE PROGRAM
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.

4.1. Updated Map of Sanitary Sewer System
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.

4.2. Preventive Operation and Maintenance Activities
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 5
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.

The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.

4.3. Training
In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.

4.4. Equipment Inventory
An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

5. DESIGN AND PERFORMANCE PROVISIONS
The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

5.1. Updated Design Criteria and Construction Standards and Specifications Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.

5.2. Procedures and Standards
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 6

6. SPILL EMERGENCY RESPONSE PLAN
The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State;
• Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities;
• Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 7

7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.

The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances; • A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; • Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance;
• An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.

8.1 System Evaluation and Condition Assessment
The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 8
• Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
• Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; o Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State;
• Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.

8.2. Capacity Assessment and Design Criteria
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events;
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information; • Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 9
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and • Necessary redundancy in pumping and storage capacities.

8.3. Prioritization of Corrective Action
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.

8.4. Capital Improvement Plan
The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program;
• Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS
The Plan must include an Adaptive Management section that addresses Planimplementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element;
• Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 10

10. INTERNAL AUDITS
The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.

11. COMMUNICATION PROGRAM
The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND

RECORDKEEPING REQUIREMENTS
Table of Contents

1. Notification Requirements......................................................................................... E1-3

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3

1.2. Spill Notification Information........................................................................... E1-4

1.3. Notification of Spill Report Updates................................................................ E1-4

2. Spill-Specific Monitoring Requirements .................................................................... E1-5

2.1 Spill Location and Spread .............................................................................. E1-5

2.2 Spill Volume Estimation.................................................................................. E1-5

2.3. Receiving Water Monitoring ............................................................................E1-5

2.4. Safety and Access Exceptions ........................................................................E1-8

3. Reporting Requirements ............................................................................................E1-8

3.1. Reporting Requirements for Individual Category 1 Spill Reporting .................E1-8

3.2. Reporting Requirements for Individual Category 2 Spill Reporting ...............E1-12

3.3. Monthly Certified Spill Reporting for Category 3 Spills..................................E1-14

3.4. Monthly Certified Spill Reporting for Category 4 Spills..................................E1-16

3.5. Amended Certified Spill Reports for Category 3 Spills ..................................E1-16

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills .............E1-16

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................E1-16

3.8. Electronic Sanitary Sewer System Service Area Boundary Map...................E1-17

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)..................................................................E1-17

3.10. Sewer System Management Plan Audit Reporting Requirements ................E1-19

3.11. Sewer System Management Plan Reporting Requirements .........................E1-19

4. Recordkeeping Requirements .................................................................................E1-20

4.1. Recordkeeping Time Period..........................................................................E1-20

4.2. Availability of Documents ..............................................................................E1-20

4.3. Spill Reports..................................................................................................E1-20

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills .......E1-21

4.5. Sewer System Telemetry Records................................................................E1-22

4.6. Sewer System Management Plan Implementation Records .........................E1-22

4.7. Audit Records................................................................................................E1-23 STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2

4.8. Equipment Records.......................................................................................E1-23

4.9. Work Orders..................................................................................................E1-23 STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING

REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board (State Water Board) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.

1. NOTIFICATION REQUIREMENTS

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4

1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5

2. SPILL-SPECIFIC MONITORING REQUIREMENTS

2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.

For multiple appearance points of a single spill event, the points closest to the spill origin.
• Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

2.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the Enrollee shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The Enrollee shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

2.3. Receiving Water Monitoring

2.3.1. Receiving Water Visual Observations
Through visual observations and use of best available spill volume-estimating techniques and field calculation techniques, the Enrollee shall gather and document the following information for spills discharging to surface waters:
• Estimated spill travel time to the receiving water;
• For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water;
• Estimated spill volume entering the receiving water; and • Photography of:
o Waterbody bank erosion,
o Floating matter,
o Water surface sheen (potentially from oil and grease), STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 6
o Discoloration of receiving water, and
o Impact to the receiving water.

2.3.2. Receiving Water – Water Quality Sampling and Analysis For sewage spills in which an estimated 50,000 gallons or greater are discharged into a surface water, the Enrollee shall conduct the following water quality sampling no later than 18 hours after the Enrollee’s knowledge of a potential discharge to a surface water:
• Collect one water sample, each day of the duration of the spill, at:
o The DCS-001 location as described in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment, if sewage discharges to a surface water via a drainage conveyance system; and/or
o Each of the three receiving water sampling locations in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment;
If the receiving water has no flow during the duration of the spill, the Enrollee must report “No Sampling Due To No Flow” for its receiving water sampling locations.

The Enrollee shall analyze the collected receiving water samples for the following constituents per section 2.3.3 (Water Quality Analysis Specifications) of this Attachment:
• Ammonia, and
• Appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives, including one or more of the following, unless directed otherwise by the Regional Water Board:
o Total Coliform Bacteria
o Fecal Coliform Bacteria
o E-coli
o Enterococcus
Dependent on the receiving water(s), sampling of bacterial indicators shall be sufficient to determine post-spill (after the spill) compliance with the water quality objectives and bacterial standards of the California Ocean Plan or the California Inland Surface Water Enclosed Bays, and Estuaries Plan, including the frequency and/or number of post-spill receiving water samples as may be specified in the applicable plans.

The Enrollee shall collect and analyze additional samples as required by the applicable Regional Water Board Executive Officer or designee.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 7

2.3.3. Water Quality Analysis Specifications
Spill monitoring must be representative of the monitored activity (40 Code of Federal Regulations section 122.41(j)(1)).

Sufficiently Sensitive Methods
Sample analysis must be conducted according to sufficiently sensitive test methods approved under 40 Code of Federal Regulations Part 136 for the sample analysis of pollutants. For the purposes of this General Order, a method is sufficiently sensitive when the minimum level of the analytical method approved under 40 Code of Federal Regulations Part 136 is at or below the receiving water pollutant criteria.

Environmental Laboratory Accreditation Program-Accredited Laboratories The analysis of water quality samples required per this General Order must be performed by a laboratory that has accreditation pursuant to Article 3 (commencing with section 100825) of Chapter 4 of Part 1 of Division 101 of the Health and Safety Code. (Water Code section 13176(a).) The State Water Board accredits laboratories through its Environmental Laboratory Accreditation Program (ELAP).

2.3.4. Receiving Water Sampling Locations
The Enrollee shall collect receiving water samples at the following locations.

Sampling of Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling
Location Sampling Location Description
DCS-001 A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Receiving Surface Water Sampling (RSW)1
Sampling
Location Sampling Location Description
RSW-001
Point of Discharge
A point in the receiving water where sewage initially enters the receiving water.

RSW-001U:

Upstream of Point
of Discharge
A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 8
Sampling
Location Sampling Location Description
RSW-001D:

Downstream of
Point of Discharge
A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water.
1 The Enrollee must use its best professional judgment to determine the upstream and downstream distances based on receiving water flow, accessibility to upstream/downstream waterbody banks, and size of visible sewage plume.

2.4. Safety and Access Exceptions
If the Enrollee encounters access restrictions or unsafe conditions that prevents its compliance with spill response requirements or monitoring requirements in this General Order, the Enrollee shall provide documentation of access restrictions and/or safety hazards in the corresponding required report.

3. REPORTING REQUIREMENTS
All reporting required in this General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in this General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of this General Order.

The Enrollee shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

3.1. Reporting Requirements for Individual Category 1 Spill Reporting

3.1.1. Draft Spill Report for Category 1 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 1 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 9

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system;

11. Description and photographs of all discharge point(s) into the surface water;

12. Estimated spill volume that discharged to surface waters; and

13. Estimated total spill volume recovered.

3.1.2. Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.1.1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 10

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15.Description of the water body(s), including but not limited to:
o Observed impacts on aquatic life,
o Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
o Responsible entity for closing/restricting use of water body, and o Number of days closed/restricted as a result of the spill.

16.Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

3.1.3. Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the Enrollee shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
o Complete and detailed explanation of how and when the spill was discovered; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 11
o Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions;
o Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
o Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; o Detailed description of the spill cause(s);
o Description of the pipe material, and estimated age of the pipe material, at the failure location;
o Description of the impact of the spill;
o Copy of original field crew records used to document the spill; and o Historical maintenance records for the failure location.

2. Enrollee’s response to the spill:
o Chronological narrative description of all actions taken by the Enrollee to terminate the spill;
o Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and o Final corrective action(s) completed and a schedule for planned corrective actions, including:
▪ Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
▪ Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and ▪ Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
o Description of all water quality sampling activities conducted; o List of pollutant and parameters monitored, sampled and analyzed; as required in section 2.3 (Receiving Water Monitoring) of this Attachment; o Laboratory results, including laboratory reports;
o Detailed location map illustrating all water quality sampling points; and o Other regulatory agencies receiving sample results (if applicable).

4. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 12

3.1.4. Amended Certified Spill Reports for Individual Category 1 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.2. Reporting Requirements for Individual Category 2 Spill Reporting

3.2.1. Draft Spill Report for Category 2 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 2 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 13
o Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

11. Estimated total spill volume recovered.

3.2.2. Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.2.1 (Draft Spill Report for Category 2 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 14

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

3.2.3. Amended Certified Spill Reports for Individual Category 2 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.3. Monthly Certified Spill Reporting for Category 3 Spills The Enrollee shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry locations(s); o Estimated spill volume fully recovered from the drainage conveyance system; and STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 15
o Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
o Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
o Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
▪ Adjusted schedule/method of preventive maintenance,
▪ Planned rehabilitation or replacement of sanitary sewer asset, ▪ Inspected, repaired asset(s), or replaced defective asset(s), ▪ Capital improvements,
▪ Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
▪ Description of spill response activities,
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 16
▪ Spill response completion date, and
▪ Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

3.4. Monthly Certified Spill Reporting for Category 4 Spills The Enrollee shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

3.5. Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the Enrollee may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The Enrollee shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the Enrollee shall:
• Maintain records per section 4.4. of this Attachment; The Enrollee shall provide records upon request by State Water Board or Regional Water Board staff.
• Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or Enrollee-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the Enrollee shall certify, within 30 calendar days after STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 17
the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per section 3.6 of this Attachment) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the Enrollee has no further spills of any category, in the subsequent calendar month, the Enrollee shall certify “no-spills” for the subsequent calendar month.

If the Enrollee has no spills from its systems during a calendar month, but the Enrollee voluntarily reported a spill from a private lateral or a private system, the Enrollee shall certify “no-spills” for that calendar month.

If the Enrollees has spills from its owned and/or operated laterals during a calendar month, the Enrollee shall not certify “no spills” for that calendar month.

3.8. Electronic Sanitary Sewer System Service Area Boundary Map The Legally Responsible Official shall submit, to the State Water Board, an up-to-date electronic spatial map of its sewer system service area boundaries. The map must be in accordance with section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order and the specification provided on the statewide Sanitary Sewer Systems program website. The map must include the location of wastewater treatment facility(ies) that treats the sewer system waste, if in the same sewer service boundary.

By the Effective Date of this General Order, specifications for the electronic sanitary sewer service area boundary map format will be provided on the statewide Sanitary Sewer Systems Order program website.

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)
A new Enrollee shall complete and submit its first certified Annual Report into the online CIWQS Sanitary Sewer System Database, within 30 days of obtaining a CIWQS account; Subsequent Annual Reports are due by April 1 of each year.

All enrollees shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of this General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The Enrollee’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS;
The Annual Report must address, and update as applicable, the following items:
• Population served;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 18
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order; • Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V);
• System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the Enrollee,
o Portion of laterals that is Enrollee’s responsibility, o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste;
• Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system;
• Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system;
• Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of this General Order;
• Major spill causes (for example, root intrusion, grease deposition); STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 19
• System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

3.10. Sewer System Management Plan Audit Reporting Requirements The Enrollee shall submit its Sewer System Management Plan Audit and other pertinent audit information, in accordance with section 5.4 (Sewer System Management Plan Audits) of this General Order, to the online CIWQS Sanitary Sewer System Database by six (6) months after the end of the 3-year audit period.

If a Sewer System Management Plan Audit is not conducted as required: the Enrollee shall:
• Update the online CIWQS Sanitary Sewer System Database and select the justification for not conducting the Audit; and
• Notify its corresponding Regional Water Board (see Attachment F (Regional Water Quality Control Board Contact Information)) of the justification for the lapsed requirements.

The Enrollee’s reporting of a justification for not conducting a timely Audit does not justify non-compliance with this General Order. The Enrollee shall:
• Submit the late Audit as required in this General Order; and • Comply with subsequent Audit requirements and due dates corresponding with the original audit cycle.

3.11. Sewer System Management Plan Reporting Requirements For an Existing Enrollee previously regulated by Order 2006-0003-DWQ: Within every six (6) years after the required due date of its last Plan Update, the Legally Responsible Official shall upload and certify a local governing entity-approved Sewer System Management Plan Update to the online CIWQS Sanitary Sewer System Database. If the electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its updated Sewer System Management Plan posted on its own website.

Order 2006-0003-DWQ required each enrollee to develop its initial Sewer System Management Plan per the following schedule, with required Plan updates at a frequency of 5-years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2009 Between 100,000 and 10,000: August 2, 2009
Between 10,000 and 2,500: May 2, 2010
Less than 2,500: August 2, 2010
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 20
This Order carries forth the previously-required Plan Update schedule per Order 2006-0003-DWQ. Per the six-year Plan Update frequency required in this Order, the Enrollee shall upload and certify its first Plan Update, to the online CIWQS Sanitary Sewer System Database by the following due dates, with subsequent Plan Updates at the frequency of six years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2025 Between 100,000 and 10,000: August 2, 2025
Between 10,000 and 2,500: May 2, 2026
Less than 2,500: August 2, 2026
For a New Enrollee: Within twelve (12) months of its Application for Enrollment Approval date, the Legally Responsible Official of a new Enrollee shall upload and certify a local governing entity-approved Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database. If electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its Sewer System Management Plan posted on its own website. The due date for subsequent 6-year Plan updates, is six (6) years from the submittal due date of the new Enrollee’s first Sewer System Management Plan.

4. RECORDKEEPING REQUIREMENTS
The Enrollee shall maintain records to document compliance with the provisions of this General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by an Enrollee’s contractor(s).

4.1. Recordkeeping Time Period
The Enrollee shall maintain records of documents required in this Attachment, including records collected for compliance with this General Order, and records collected in accordance with previous General Order 2006-0003-DWQ, for five (5) years.

4.2. Availability of Documents
The Enrollee shall make the records required in this General Order readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

4.3. Spill Reports
The Enrollee shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the Enrollee responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
o Date, time, and method of notification,
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 21
o Date and time the complainant first noticed the spill, if available, o Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available,
o Complainant’s contact information, if available, and
o Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the Enrollee, using all available information, to comply with this General Order, and previous General Order 2006-0003-DWQ as applicable;
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and • Records, in accordance with the Monitoring Requirements in this Attachment.

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills An Enrollee must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 Enrollee-owned and/or operated lateral spill, and report in accordance to section 3.6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills) of this Attachment.

Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
o Description of drainage conveyance system location,
o Estimated spill volume fully recovered within the drainage conveyance system, and
o Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 22
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, ongoing spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

Recordkeeping of Individual Lateral Spill Information:

1. Date and time the Enrollee was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
o Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
o System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

4.5. Sewer System Telemetry Records
The Enrollee shall maintain the following sewer system telemetry records if used to document compliance with this General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s); • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes;
• Computerized maintenance management system records; and • Asset management-related records.

4.6. Sewer System Management Plan Implementation Records The Enrollee shall maintain records documenting the Enrollee’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 23

4.7. Audit Records
The Enrollee shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and
• Follow-up actions based on audit findings.

4.8. Equipment Records
The Enrollee shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

4.9. Work Orders
The Enrollee shall maintain record of work orders for operations and maintenance projects.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 1
ATTACHMENT E2 – SUMMARY OF NOTIFICATION, MONITORING AND REPORTING

REQUIREMENTS
This Attachment provides a summary of notification, monitoring and reporting requirements, by spill category, and for Enrollee-owned and/or operated laterals as required in Attachment E1 of this General Order, for quick reference purposes only.

Table E2-1
Spill Category 1: Spills to Surface Waters
Spill
Requirement Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 1 spill of 1,000 gallons or greater,
discharging or threatening to discharge to surface
waters:

Notify the California Office of Emergency Services
and obtain a notification control number.

California Office
of Emergency
Services at:
(800) 852-7550
(Section 1 of
Attachment E1)
Monitoring
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the receiving
water within 18 hours of initial knowledge of spill of
50,000 gallons or greater to surface waters.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date;
• Submit Technical Report within 45 calendar days
after the spill end date for a Category 1 spill in
which 50,000 gallons or greater discharged to
surface waters; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.1 of
Attachment E1)
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 2
Table E2-2
Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 2 spill of 1,000 gallons or greater,
discharging or threatening to discharge to waters of
the State:

Notify California Office of Emergency Services and
obtain a notification control number.

California Office of
Emergency
Services at: (800)
852-7550
(Section 1 of
Attachment E1)
Monitoring Conduct spill-specific monitoring.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.2 of
Attachment E1)
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 3
Table E2-3
Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1)
Reporting
• Submit monthly Certified Spill Report to the online
CIWQS Sanitary Sewer System Database within
30 calendars days after the end of the month in
which the spills occur; and
• Submit Amended Spill Reports within 90 calendar
days after the Certified Spill Report due date.
(Section 3.3 and 3.5 of
Attachment E1)
Table E2-4
Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring.
(Section 2 of Attachment
E1)
Reporting
• If, during any calendar month, Category 4 spills
occur, certify monthly, the estimated total spill
volume exiting the sanitary sewer system, and the
total number of all Category 4 spills into the online
CIWQS Sanitary Sewer System Database, within
30 days after the end of the calendar month in
which the spills occurred.
• Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS
Sanitary Sewer System Database, by February 1st
after the end of the calendar year in which the
spills occur.
(Section 3.4, 3.6, 3.7
and 4.4 of Attachment
E1)
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 4
Table E2-5
Enrollee Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of a
spill of 1,000 gallons or greater, from an enrolleeowned and/or operated lateral, discharging or threatening to discharge to waters of the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Not applicable to a spill of less than 1,000 gallons.

California Office of
Emergency Services
at: (800) 852-7550
(Section 1 of Attachment
E1)
Monitoring Conduct visual monitoring. (Section 2 of Attachment E1)
Reporting
• Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary
Sewer System Database, by February 1st after the
end of the calendar year in which the spills occur.
• Report a lateral spill of any volume that discharges
to a surface water as a Category 1 spill.
(Sections 3.6, 3.7 and

4.4 of Attachment E1)
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 1
ATTACHMENT F – REGIONAL WATER QUALITY CONTROL BOARD CONTACT

INFORMATION
This Attachment provides a map, list of counties, and contact information to assist the Enrollee in identifying the corresponding Regional Water Quality Control Board office, for all Regional Water Board notification requirements in this General Order.

Region 1 -- North Coast Regional Water Quality Control Board:

Del Norte, Glenn, Humboldt, Lake, Marin, Mendocino, Modoc, Siskiyou, Sonoma, and Trinity counties.

[email protected] or (707) 576-2220
Region 2 -- San Francisco Bay Regional Water Quality Control Board:

Alameda, Contra Costa, San Francisco, Santa Clara (Northern most part of Morgan Hill), San Mateo, Marin, Sonoma, Napa, Solano counties.

[email protected] or (510) 622-2369
Region 3 -- Central Coast Regional Water Quality Control Board:

Santa Clara (most of Morgan Hill), San Mateo (Southern portion), Santa Cruz, San Benito, Monterey, Kern (small portions), San Luis Obispo, Santa Barbara, Ventura (Northern portion) counties.

[email protected] or (805) 549-3147
Region 4 -- Los Angeles Regional Water Quality Control Board:

Los Angeles, Ventura counties (small portions of Kern and Santa Barbara counties). [email protected] or (213) 576-6600
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 2
Region 5 -- Central Valley Regional Water Quality Control Board:

Rancho Cordova (Sacramento) Office: Colusa, Lake, Sutter, Yuba, Sierra, Nevada, Placer, Yolo, Napa, (North East), Solano (West), Sacramento, El Dorado, Amador, Calaveras, San Joaquin, Contra Costa (East), Stanislaus, Tuolumne counties.

[email protected] or (916) 464-3291 Fresno Office: Fresno, Kern, Kings, Madera, Mariposa, Merced, and Tulare counties, and small portions of San Benito and San Luis Obispo counties.

[email protected] or (559) 445-5116 Redding Office: Butte, Glen, Lassen, Modoc, Plumas, Shasta, Siskiyou, and Tehama counties.

[email protected] or (530) 224-4845 Region 6 -- Lahontan Regional Water Quality Control Board:

Lake Tahoe Office: Alpine, Modoc (East), Lassen (East side and Eagle Lake), Sierra, Nevada, Placer, El Dorado counties.

[email protected] or (530) 542-5400 Victorville Office: Mono, Inyo, Kern (East), San Bernardino, Los Angeles (North East corner) counties.

[email protected] or (760) 241-6583 Region 7 -- Colorado River Basin Regional Water Quality Control Board:

Imperial county and portions of San Bernardino, Riverside, San Diego counties.

[email protected] or (760) 346-7491
Region 8 -- Santa Ana Regional Water Quality Control Board:

Orange, Riverside, San Bernardino counties.

[email protected] or (951) 782-4130
Region 9 -- San Diego Regional Water Quality Control Board:

San Diego county and portions of Orange and Riverside counties.

[email protected] or (619) 516-1990
End of Order 2022-0103-DWQ
Sewer System Management Plan
For
City of Roseville
WDID SSO10935
Revised 20 FEB 22
2 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP Change Log ...............................................................................................................................5 List of Acronyms...............................................................................................................................10 List of Terms.....................................................................................................................................12 Executive Summary ..........................................................................................................................17 Service Area and Relevant Statistics..................................................................................................18 0 SSMP Overview..................................................................................................................20 1 Goals.................................................................................................................................22

1.1 Roseville’s Goals.............................................................................................................22

1.2 Element Objectives.........................................................................................................22 2 Organization......................................................................................................................24

2.1 Legally Responsible Official (LRO) ...................................................................................24

2.2 SSMP Responsibility Chart ..............................................................................................24

2.3 Chain of Communication Reporting Chart .......................................................................26 3 Legal Authority ..................................................................................................................28

3.1 Industrial Pretreatment Program....................................................................................29

3.2 Design and Construction Standards.................................................................................29

3.3 Sewer Access Authority...................................................................................................29

3.4 Fats Oils and Grease .......................................................................................................29

3.5 Regulation of Sewer Use-Enforcement............................................................................30

3.6 Inter-Agency and Satellite Agreements...................................................................................30

3.6.1 Joint Exercise of Powers Agreement South Placer Wastewater Authority ................................................ 30

3.6.2 South Placer Wastewater Facilities Operation and Use Agreement .......................................................... 30

3.6.3 Contract and Operating Agreement between SRCSD and SASD ................................................................ 30

3.7 Appendix 3- Legal Authority Documents.................................................................................30 4 Operation and Maintenance ..............................................................................................32

4.1 Collection System Maps and Information ...............................................................................32

4.1.1 Map Update Policy ..................................................................................................................................... 33

4.2 Operation and Maintenance ..................................................................................................34

4.2.1 Preventative Maintenance Program........................................................................................................... 34

4.2.2 Corrective Maintenance Program .............................................................................................................. 37

4.2.3 Infrastructure Repair .................................................................................................................................. 37

4.3 Rehabilitation and Replacement ............................................................................................38

4.4 Training and Certification.......................................................................................................39

4.4.1 New Hires ................................................................................................................................................... 39 3 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.4.2 Training and Tracking ................................................................................................................................. 40

4.4.3 Certification ................................................................................................................................................ 41

4.5 Equipment and Critical Spare Parts Inventory......................................................................... 41

4.6 Critical Spare Parts.................................................................................................................42

4.7 Appendix 4- Operation and Maintenance Program Documents............................................... 43 5 Design and Performance Provisions....................................................................................45

5.1 Sanitary Sewer Design Standards...........................................................................................45

5.2 Sanitary Sewer Construction Standards..................................................................................45

5.3 Sewer System Construction and Performance Testing............................................................. 46

5.3.1 Testing Of Installed Improvements ............................................................................................................ 46

5.3.2 Punchlist Process........................................................................................................................................ 48

5.3.3 Repairing Installed Improvements.............................................................................................................. 48 6 Overflow Emergency Response...........................................................................................50

6.1 Notification Procedures.........................................................................................................50

6.2 Emergency Response Procedures...........................................................................................52

6.2.1 Goals of SSOERP.......................................................................................................................................... 52

6.2.2 Investigate and Assess Problem (WWC Personnel).................................................................................... 52

6.2.3 Contain SSO (WWC Personnel)................................................................................................................... 54

6.2.4 Traffic Control (WWC Personnel) ............................................................................................................... 55

6.2.5 Correct Cause (WWC Personnel)................................................................................................................ 56

6.2.6 Final Volume Estimate (WWC Personnel) .................................................................................................. 58

6.2.7 Initiate Cleanup (WWC Personnel)............................................................................................................. 63

6.2.8 Receiving Water Sampling (Industrial Waste Section) ............................................................................... 63

6.2.9 Notification Requirements (Superintendent/Supervisor) .......................................................................... 64

6.3 Staff and Contractor Training .................................................................................................64

6.4 Spill Mitigation and Containment...........................................................................................65 SSOERP- Appendix A- SSO Start Time Policy...............................................................................67 SSOERP Appendix B- Flooded Structure Procedures ...................................................................68 SSOERP Appendix C- Water Quality Sampling............................................................................69 SSOERP -Appendix D- Sewer Call For Service..............................................................................72 SSOERP Appendix E- Sewer Lift Station Failure Response ...........................................................73 SSOERP Appendix F- SSO Chain of Communication ....................................................................74 7 FOG Control Program.........................................................................................................76

7.1 Public Education Outreach.....................................................................................................76

7.2 FOG Disposal Plan..................................................................................................................76

7.3 Legal Authority......................................................................................................................77

7.4 GRD, Design Standards, BMPs, Recordkeeping and Reporting ................................................. 77

7.4.1 Requirement to Install GRD........................................................................................................................ 77 4 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

7.4.2 Design Standards........................................................................................................................................ 78

7.4.3 Best Management Practices....................................................................................................................... 78

7.4.4 Records and Reporting Requirements........................................................................................................ 78

7.5 Authority to Inspect...............................................................................................................78

7.6 Hot Spot Identification and PM Schedule ...............................................................................79

7.7 FOG Source Control Measures................................................................................................79

7.7.1 FOG Characterization Data Form................................................................................................................ 80 8 System Evaluation and Capacity Assurance Plan.................................................................82

8.1 Capacity Evaluation Process...................................................................................................82

8.2 Design Criteria.......................................................................................................................82

8.3 Capacity Enhancement Measures...........................................................................................83

8.4 Capital Improvement Plan Schedule.......................................................................................84

8.5 Appendix 8 – System Evaluation and Capacity Assurance Documents...................................... 84 9 Monitoring, Measurement and Program Modification .......................................................86

9.1 Metrics to Prioritize SSMP Activities.......................................................................................86

9.2 Monitor and Measure Element Effectiveness.......................................................................... 88

9.3 SSMP Performance Monitoring and Update Process............................................................... 89

9.4 SSO Trends............................................................................................................................89

9.5 Appendix 9- Monitoring, Measurement & Modification.......................................................... 90 10 Program Audit and Annual Report..................................................................................92

10.1 Audit Process Summary .........................................................................................................92

10.2 SSMP Program Modifications.................................................................................................92

10.3 Appendix 10 - SSMP Audit Documents ...................................................................................93 11 Communication Program................................................................................................95

11.1 Purpose of the Communication Program................................................................................95

11.2 SSMP Development and Implementation ...............................................................................95

11.3 Public Outreach.....................................................................................................................95

11.3.1 Live Sewer Smart.................................................................................................................................... 96

11.4 Tributary/Satellite Communication ........................................................................................96 5 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

SSMP CHANGE LOG
Monitoring and Reporting Program (MRP) Order No. WQ 2013-0058-EXEC E.(3):

All records documenting changes to the SSMP since its last certification shall be attached to the SSMP. These records should show when a subsection(s) was changed or updated and who authorized the change.

City of Roseville-SSMP Change Log
Date Section Comments Approval
12/11/13
A complete update of SSMP, both
intranet version, and city website
version
Chris Bracco
1/9/14 Supporting Documents for SSMP
Audit\SSMP Resoultion_14.pdf Council resolution for SSMP adoption Chris Bracco 4/7/14
Supporting Documents for SSMP
Audit\Roseville SSMP Audit FY13 -
FINAL.pdf
Final SSMP Audit- Waterworks
Engineering Chris Bracco
4/7/14 Supporting Documents for SSMP
Audit\SSMP Resoultion_14.pdf SSMP Resolution 2014 Chris Bracco 3/24/15 Appendix B\APPENDIX B1_Contact List.doc
Updated Rich Plecker as Utility
Director Chris Bracco
3/24/15 Appendix B\APPENDIX B2_Contact List.doc
Updated Dave Rawe as claims
administrator Chris Bracco
4/30/15 Master_Roseville_SSMP.doc Added Goal re: design and construction standards Chris Bracco
9/8/16 Appendix B\APPENDIX B1_Contact List.doc
Updated City Council/PUC members
per 14/15 Audit Rec. Chris Bracco
10/31/16 Appendix B\APPENDIX B2_Contact List.doc
Updated RWQCB Contact
Information Chris Bracco
10/31/16
Appendix C\Appendix C-7 Contract
and Operations Agreement
SASD_SRCSD.pdf
Contract with SASD & Sac Regional Chris Bracco
10/31/16 Appendix G\Appendix G-4 FOG
Inspection Form.pdf Addition of FOG Inspection Form Chris Bracco 9/22/16
Appendix I\Appendix I-4 - Key
Performance Indicators
Benchmarking.xlsx
Addition of Key Performance
Indicator Sheet Chris Bracco
10/31/16 Appendix J\Appendix J-1_Rsvl
WWC SSMP Audit Procedure.doc SSMP Audit procedures Chris Bracco 6 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
9/25/19 Appendix B\APPENDIX B1_Contact List.doc Updated council and PUC Chris Bracco 9/25/19 Appendix B\APPENDIX B2_Contact List.doc Update contact information Chris Bracco 9/25/19 Appendix C\APPENDIX C-3
Sanitary Sewer Design.doc Update Link Chris Bracco
9/25/19 Appendix D\Appendix D-5 CWEA
Certification.docx Chris Bracco
9/25/19 Appendix F\Appendix F-1\4_SSO
Field Report.pdf
Updated SSO overflow charts in field
report
Chris Bracco
9/25/19
Appendix F\Appendix F-1\2_SSO
Emergency Response
Procedures.pdf
Added updated field report Chris Bracco
9/25/19 Appendix F\Appendix F-1\1_SSO
Flowchart.pdf Chris Bracco
9/25/19
Appendix I\APPENDIX I-4 Key
Performance Indicators
Benchmarking.pdf
Chris Bracco
9/25/19
SSMP Audit_ Update Data\SSMP
Audit Update FY
15_18\Roseville_SSMP_Audit_FY15-
18 - FINAL-stamped.pdf
Chris Bracco
10/14/19 Completed Update of SSMP both
intranet and City Website version Chris Bracco
5/13/20 Appendix B\APPENDIX B1_Contact List.pdf
Added Kevin Ryan Supervisor to
contact list Chris Bracco
5/13/20 Appendix B\APPENDIX B2_Contact List.pdf
Added Kevin Ryan Supervisor to
contact list Chris Bracco
5/13/20 Appendix F\Appendix F-1\3_SSO
Notification Guide .doc
Added Kevin Ryan Supervisor to
contact list Chris Bracco
5/13/20
Appendix I\Appendix I-4 Key
Performance Indicators
Benchmarking.pdf
KPI sheet with updated numbers Chris Bracco
2/05/22 Update and re-write the entire SSMP
SSMP was re-formatted and
subsequent changes to operation and
maintenance have been included.

Daniel Pruden
7 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
8 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
City Council Resolution
9 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONA LLY BLANK
10 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

LIST OF ACRONYMS
BMP Best Management Practice
CASA California Association of Sanitation Agencies
CCTV Closed-Circuit Television
CFR Code of Federal Regulations
CDFW California Department of Fish and Wildlife
CIP Capital Improvement Plan or Capital Improvement Project City City of Roseville
CIWQS California Integrated Water Quality System
CM Corrective Maintenance
CMMS Computerized Maintenance Management System
CBT Computer Based Training
CWEA California Water Environment Association
CVCWA Central Valley Clean Water Association
EDU Equivalent Dwelling Unit
EPA Environmental Protection Agency
ERP Emergency Response Plan
EUD Environmental Utilities Department
FOG Fats, Oils, and Grease
FSE Food Service Establishments
GIS Geographical Information System
GPS Global Positioning System
GRD Grease Removal Device
GWDR General Waste Discharge Requirements or Waste Discharge Requirements (WDR) I/I Inflow / Infiltration
ICS Incident Command System
IERP Integrated Emergency Response Plan
IWD Industrial Waste Division
LRO Legally Responsible Official
MGD million gallons per day
MRP Monitoring and Reporting Program
MSDS Material Safety Data Sheets
NASSCO National Association of Sewer System Companies
NPDES National Pollution Discharge Elimination System
O&M Operation and Maintenance
OERP Overflow Emergency Response Plan
OES Office of Emergency Services
Order SWRCB Order No. 2006-0003-DWQ adopted May 2, 2006 PACP Pipeline Assessment and Certification Program
PdM Predictive Maintenance
PM Preventative Maintenance
PMP Preventative Maintenance Program
POTWs Publicly Owned Treatment Works
R&R Rehabilitation and Replacement
RWQCB Regional Water Quality Control Board
SPW Safety Plus Web
SIUs Significant Industrial Users
11 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SOP Standard Operating Procedure
SPWA South Placer Wastewater Authority
SSMP Sewer System Management Plan
SSO Sanitary Sewer Overflow
SWRCB State Water Resources Control Board
UPC Uniform Plumbing Code
USA Underground Service Alert
WDP Waste Discharge Permit
WW Wastewater
WWC Wastewater Collection
WWTP Wastewater Treatment Plant
12 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

LIST OF TERMS
Authorized Representative – The person designated, for a municipality, state, federal, or other public agency, as either a principal executive officer or ranking elected official or a duly authorized representative of that person.

Blockage – Something that partially or fully blocks the wastewater from flowing through a sewer pipeline. The blockage can be caused by debris in the sewer, grease buildup, root intrusion, or a partial or complete pipeline collapse. If not caught in time, the blockage may cause an overflow.

California Association of Sanitation Agencies (CASA) - CASA is a non-profit, statewide trade association representing public agencies that provide wastewater collection, treatment, disposal, and/or water reclamation services to about 90 percent of the sewered population in California.

Website: http://www.casaweb.org/
California Water Environment Association (CWEA) – CWEA is an association of 8,000-plus professionals in the wastewater industry. CWEA is committed to keeping California's water clean.

CWEA trains and certifies wastewater professionals, disseminates technical information, and promotes sound policies to benefit society by protecting and enhancing the water environment. CWEA offers services at the state level and locally through 17 local geographical sections. In addition, through their on-line bookstore, CWEA offers technical references for sewer system operation and maintenance.

Website: http://www.cwea.org/ .

Central Valley Clean Water Association (CVCWA) – CVCWA is an association comprised of over 50 wastewater treatment and collection system agencies. CVCWA’s mission is to effectively represent the interests of public wastewater agencies in the Central Valley in regulatory matters and to support the exchange of information so members can best meet their business challenges.

Website: http://www.cvcwa.org/ .

Central Valley Regional Water Quality Control Board – Also known as Regional Water Board or RWQCB. The mission of this state regulatory agency is to: preserve, enhance, and restore the quality of California's water resources, and ensure their proper allocation and efficient use for the benefit of present and future generations. Website: http://www.waterboards.ca.gov/centralvalley/ .

Dynamic Model – Computer hydraulic model simulation which solves the complete dynamic flow routing equations (St. Venant’s equations) for accurate simulation of backwater, looped connections, surcharging, and pressure flow in a collection system.

Enrollee – The legal public entity that owns a sanitary sewer system, as defined by the GWDR, which has submitted a complete and approved application for coverage under the GWDR. This is also called a sewer system agency or wastewater collection system agency.

Fats, Oils and Grease (FOG) - Fats, oils, and grease that are discharged into the sanitary sewer collection system by Food Service Establishments (FSE), homes, apartments, and other sources. FOG is a major cause of blockages leading to increased maintenance and sometimes SSOs. 13 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
FOG Control Program – To be implemented at the Enrollee’s discretion. May include public education program; plan and schedule for the disposal of FOG; legal authority to prohibit FOG related discharges; requirement to install grease removal devices; authority to inspect grease producing facilities; identification of sanitary sewer system sections subject to FOG blockages and the establishment of a cleaning schedule for each section; development and implementation of source control measures for all sources of FOG.

Geographical Information System (GIS) – A database linked with mapping, which includes various layers of information used by government officials. Examples of information found on a GIS can include a sewer map; sewer features such as pipe location, diameter, material, condition, last date cleaned or repaired. The GIS also typically contains base information such as streets and parcels.

Governing Board – This is the governing board of the sewer entity developing the SSMP. Examples would be the Board of Directors, the City Council, or the County Board of Supervisors.

GWDR – General Waste Discharge Requirements – A GWDR is an authorization to discharge waste with certain conditions, which can be issued on an individual basis or to a group of dischargers. The Statewide General WDR for Sanitary Sewer Systems was adopted by the SWCRB and will be implemented by the Regional Water Boards and SWRCB.

Infiltration – The seepage of groundwater into a sewer system, including service connections. Seepage frequently occurs through defective or cracked pipes, pipe joints, connections or manhole walls and joints.

Inflow – Water discharged into a sewer system and service connections from such sources as, but not limited to, roof leaders, cellars, yard and area drains, foundation drains, cooling water discharges, drains from springs and swampy areas, around manhole covers or through holes in the covers, cross connections from storm and combined sewer system, catch basins, storm waters, surface runoff, street wash waters or drainage. Inflow differs from infiltration in that it is a direct discharge into the sewer rather than a leak into the sewer itself.

Lateral – The portion of sewer that connects a home or business with the main line in the street.

Sometimes sewer system agencies own or maintain a portion of the lateral.

Upper Lateral: Portion of lateral from building to property line (or easement line), usually privately owned and maintained.

Lower Lateral: Portion of lateral from property line (or easement line) to sewer mainline in the street or easement. This portion of the lateral is sometimes privately owned and maintained and sometimes publicly owned and maintained.

Monitoring and Reporting Program - The Monitoring and Reporting Program established in the WDR that establishes monitoring, record keeping, reporting and public notification requirements for the GWDR.
14 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Overflow Emergency Response Plan – Identifies measures to protect public health and the environment. A plan must include the following: notification procedure, appropriate response plan, regulatory notification procedures, employee training plan, procedures to address emergency operations, a program that ensures all reasonable steps are taken to contain and prevent discharges.

Private Lateral: That portion of the Lateral that is owned and maintained by the private property owner that it serves. Based on an individual agency’s ordinance, this may just be the Upper Lateral or can include the Lower Lateral.

Preventative Maintenance (PM) – Regularly scheduled servicing of machinery, infrastructure or other equipment using appropriate tools, tests, and lubricants. This type of maintenance can prolong the useful life of equipment, infrastructure, and machinery and increase its efficiency by detecting and correcting problems before they cause a breakdown of the equipment, or failure of the infrastructure.

R-Value – Is the amount of rainfall that reaches the collection system via infiltration and inflow. This value is typically expressed as a percentage of total rainfall volume that reaches the collection system.

Regional Water Board – Is a short name for any of the nine regional boards including the San Francisco Bay Area Regional Water Quality Control Board and the Central Valley Regional Water Quality Control Board.

Rehabilitation and Replacement Plan (also referred to as a Capital Improvement Plan) – Identifies and prioritizes system deficiencies and implements short-term and long-term rehabilitation actions to address each deficiency.

Sanitary Sewer Overflow (SSO) – The Statewide GWDR defines an SSO as any overflow, spill, release, discharge, or diversion of untreated or partially treated wastewater from a sanitary sewer system, including overflows or releases that reach waters of the United States, overflows or releases that do not reach water of the United States, and backups into buildings and/or private property caused by conditions within the publicly owned portion of the sewer system.

Sanitary Sewer Overflow Categories
Category 1 – Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that:
• Reach surface water and/or reach a drainage channel tributary to surface water • Reach a Municipal Separate Storm Sewer System (MS4) and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin. 15 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Category 2 – Discharges of untreated or partially treated wastewater of 1,000 gallons or greater resulting from an enrollee’s sanitary sewer system failure or flow condition that do not reach surface water, a drainage channel, or a MS4 unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly.

Category 3- All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition Private Lateral Sewage Discharges – Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sewer assets. PLSDs that the enrollee becomes aware of may be voluntarily reported to the CIWQS Online SSO Database.

Sanitary Sewer Systems – Any system of pipes, pump stations, sewer lines, or other conveyances, upstream of a wastewater treatment plant head works used to collect and convey wastewater to the publicly owned treatment facility. Temporary storage and conveyance facilities are part of the sanitary sewer system and discharges into these temporary storage facilities are not to be considered SSOs.

Satellite Collection System – The portion, if any, of a sanitary sewer system owned or operated by a different public agency than the agency that owns and operates the wastewater treatment facility to which the sanitary sewer system is tributary.

Sewer System Management Plan-SSMP – A series of written site-specific programs that address how a collection system owner/operator conducts their daily business as is outlined in the WDR. Each SSMP is unique for an individual discharger. The plan includes provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management and cost benefit analysis. Also, must contain a spill response plan. Certification is offered by technically qualified and experienced persons and provides a useful cost-effective means for ensuring that SSMPs are developed and implemented appropriately.

Stakeholder - A person or organization that has a vested interest in the development and outcome of the SWRCB Order No. 2006-0003 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

State Water Resources Control Board: Also called the State Board. This is the State agency that developed and passed the GWDR for collection systems and the agency that maintains the SSO reporting web site.

Static Model – A computer hydraulic model that uses the Manning’s Equation to determine hydraulic capacity of the gravity pipelines and either the Manning’s or Hazen-Williams Equations to determine the hydraulic capacity of the pressure pipeline system. The capacity is compared to the peak hydraulic flow in the system to determine potential deficiencies. The static model assumes the peak hydraulic flow occurs at all locations within the collection system at the same time. 16 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Stoppage – Something that partially or fully blocks the wastewater from flowing through a sewer pipeline. A stoppage can be caused by debris in the sewer, grease buildup, root intrusion, or a partial or full collapse of the pipeline. If not caught in time, a stoppage may cause an overflow. This is also called a blockage.

System Evaluation and Capacity Assurance Plan – A required component of an agency’s SSMP and is an important part of any agency’s overall Capital Improvement Plan that provides hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event.

Wastewater Collection System: See Sanitary Sewer System. 17 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

EXECUTIVE SUMMARY
The City of Roseville (City) is a Council-Manager form of government in which responsibilities are vested in the City Council and City Manager. In this form of government, the City Council’s role is that of a legislative policy-making body which determines not only local laws that regulate community life, but also determines public policy and gives direction to the City Manager. The City Manager administers the affairs of the city government in a business-like prudent manner.

The City’s Public Utilities Commission studies and advises the City Council on all utility issues related to city-owned utilities (electric, water, sewer, and solid waste).

The City’s Wastewater Utility is one of five utilities operated in the Environmental Utilities Department (EUD). The Wastewater Utility is responsible for operation and maintenance of all wastewater facilities owned by the City including the Publicly Owned Treatment Works (POTWs), the wastewater collection system, the water quality lab and the recycled water utility.

The City’s Wastewater Collection (WWC) Division is a division of Environmental Utilities Department (EUD). The WWC Division is responsible for management, operation, maintenance, and capacity assurance of the City’s sanitary sewer collection system, including inspecting, cleaning, repairing, and monitoring the gravity sewer lines, force mains, and lift station.

The City initiated a Sewer System Management Plan (SSMP) assessment in 2005 to evaluate how well the Wastewater Collection (WWC) Division would comply with the anticipated State Water Resources Control Board (SWRCB) Statewide General Waste Discharge Requirements (WDR) order No. 2006-0003 for Sanitary Sewer Systems. That SSMP assessment indicated that the City was positioned fairly well to comply with the SWRCB’s SSMP requirements.

In March of 2007, the WWC division along with consultant assistance, began writing the SSMP and reviewing all remaining policies, procedures, and programs to comply with the SWRCB’s WDR.

The plan described how the City would address each element of the SSMP contained in the SWRCB’s WDR to eliminate preventable Sanitary Sewer Overflows (SSOs). The WWC staff completed the development of the SSMP, which the City Council approved on 21 JAN 09.

The city continues to monitor, measure, and modify the existing SSMP as changes and program improvements are identified. The city has developed a Key Performance Indicator worksheet, which is used to monitor and measure the effectiveness of the various elements of the SSMP.

Roseville’s SSMP has been audited five times since being certified by the SWRCB. 18 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

SERVICE AREA AND RELEVANT STATISTICS
Figure-1 illustrates the boundary of Roseville’s geographical service area. Statistics provided in this SSMP are from August 2021 and are gathered from the City’s Economic Development website, https://www.roseville.ca.us/government/departments/economic_development/demographics.

The City service area is approximately 44.20 square miles, has approximately 48,734 residential, 1,932 commercial and 600 industrial sewer connections and 2 Regional Wastewater Treatment Plants.

The WWC Division provides service to approximately 146,875 sewer customers. The wastewater collection and conveyance system consist of 871 miles sewer pipe ranging from 4”to 84” in diameter, 12,538 manholes, and 17 neighborhood lift stations that convey an average dry weather flow of approximately 18.5 MGD. Sanitary sewerage is conveyed from the City’s East boundaries Figure 1 Roseville Service Area
19 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
to the Dry Creek Wastewater Treatment Plant and from its North and West boundaries to the Pleasant Grove Wastewater treatment plant.

WWC Division statistical records indicate that prior to the creation of this SSMP it has had a moderate Sanitary Sewer Overflow (SSO) rate in comparison to other communities in California of similar size and complexity. In the years prior to adoption of the SSMP, the WWC Division had experienced approximately 168 SSOs releasing approximately 15,203 gallons of sewage from the sanitary sewer collection and conveyance system. Since adoption of the SSMP in 2007, the city has experienced a combined 431 SSOs releasing approximately 15,435 gallons of sewage from the sanitary sewer system. Of that total, 11,219 gallons or 82%, have been captured and returned to the sanitary sewer system. The majority of these SSO have occurred from blockages in service laterals.

Since the adoption of the SSMP, the average volume spilled per SSO has been less than 36 gallons/event. All SSOs have been mitigated in a timely manner and have not negatively affected public health or the environment.

The purpose of this SSMP is to describe the activities the WWC Division uses to manage the City’s’ wastewater collection system to further eliminate preventable SSOs, minimize those SSOs that do occur and protect both public health and the environment. 20 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
0 SSMP Overview
The City of Roseville is required to comply with the State Water Resources Control Board Order No. 2006-0003-DWQ adopted May 2, 2006, entitled Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

The purpose of the Order is to prevent Sanitary Sewer Overflows (SSO) or sewer spills by establishing a statewide Monitoring and Reporting Program (MRP) and requiring each local or regional sewer agency to create and implement their own Sewer System Management Plan (SSMP) based on the mandatory requirements of the Order. The MRP requires each local or regional sewer agency to appoint a legally responsible official and establish a monitoring and reporting organization to monitor and report all SSOs in accordance with the requirements of the MRP and to have the LRO certify the SSO report using the California Integrated Water Quality System (CIWQS) website in the timeframe required by the Order.

The City of Roseville developed a Sewer System Management Plan specific to the wastewater collection system operated and maintained by wastewater collection personnel in the City of Roseville. This SSMP documents the activities the city will utilize to manage, operate, and maintain its wastewater collection system. The city shall take all steps feasible to eliminate SSOs, but in the event an SSO does occur, will take all steps necessary to contain and mitigate the negative impacts of an SSO.

The city’s SSMP is organized comparable to paragraph D. 13 of the general order. The SSMP includes eleven elements, and each of these elements forms a corresponding chapter in the SSMP.

The eleven elements are listed below.

1. Goals- The goal is to prevent and/or reduce SSOs and mitigate the effect of any SSOs that do occur.

The goal requires a plan and schedule to properly manage, operate, and maintain all parts of the sanitary sewer collection system.

2. Organization- The SSMP must identify the Legally Responsible Official or authorized representative as described in the Order. It must list and identify the organization positions responsible for operating and maintaining the sanitary sewer collection system including names and telephone numbers for management, administrative and maintenance positions, and the chain of communication for reporting SSOs

3. Legal Authority- Each enrollee must demonstrate through ordinances, agreements, or other legally binding procedures that they possess the legal authority to meet the requirements of the general order.

4. Operation and Maintenance Program- The SSMP must include those items that are appropriate and applicable to the enrollee’s system, including an up to date mapping system, ability to describe the O&M activities performed on the system, have a plan to develop a rehabilitation and replacement plan, and to provide training on a regular basis for collection system personnel. 21 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

5. Design and Performance Provisions- The SSMP must demonstrate that the sewer agency has and appropriately uses design and construction standards and specifications for the installation of new sewer systems, rehabilitation and repair of existing sewer systems and has procedures and standards for inspecting and testing the installation of new sewers, pumps, etc. and for rehabilitation and repair projects.

6. Overflow Emergency Response Plan- Each Enrollee shall develop and implement an overflow emergency response plan that identifies measures to protect public health and the environment.

7. Fog Control Program- Each Enrollee shall evaluate its sewer system and determine if a Fats, Oils and Grease control program is needed. The FOG control plan, if needed, must meet all the requirements of the Order.

8. System Evaluation and Capacity Assurance Plan- The Enrollee shall prepare and implement a capital improvement plan (CIP) that provides hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design for storm or wet weather events

9. Monitoring, Measurement and Program Modifications- The enrollee shall maintain relevant information to establish and prioritize SSMP activities, monitor the implementation and measure the effectiveness of the SSMP activities, and provide assessment of the performance and/or modification of the SSMP activities as required by the Order.

10. SSMP Program Audits - The Enrollee shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. This audit shall focus on evaluating the effectiveness of the SSMP

11. Communication Program- The Enrollee shall communicate on a regular basis with the public on the development, implementation, and performance of its SSMP. The communication system shall provide the public the opportunity to provide input to the Enrollee as the program is developed and implemented. The program shall also include a communication plan with tributary and satellite systems to the enrollee’s sanitary sewer system
22 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 1
1 Goals
D.13. (i) The goal of the SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the sanitary sewer system. This will help reduce and prevent SSOs, as well as mitigate any SSOs that do occur.

1.1 Roseville’s Goals
The City’s WWC Division has established eight goals to guide the implementation, and success of Roseville’s SSMP. These goals are designed to facilitate and target the management, operation, and maintenance of the sanitary sewer collection system in a manner that will sustain the infrastructure, protect public health and the environment, and achieve compliance with State Water Resources Control Board’s General Waste Discharge Requirement (GWDR) for Sanitary Sewer Systems. These goals include:

1. Properly manage, operate, and maintain all portions of the City’s wastewater collection system.

2. Provide adequate capacity to convey peak wastewater flows.

3. No repeat overflows from the same location.

4. Maintain a rate of SSO/100 miles of pipe, that is lower than the state and regional average.

5. Maintain a recovery rate for SSO/100 miles of pipe, that is higher than the state and regional average.

6. Mitigate the impacts that are associated with all SSOs that may occur.

7. Comply with all applicable regulatory notification and reporting requirements.

8. Maintain high design and construction standards for new and rehabilitated infrastructure.

1.2 Element Objectives
The WWC Division provides a safe, effective, and efficient wastewater collection and conveyance system through preventative maintenance, engineering, and customer services. The Division also provides twenty-four-hour emergency services to respond to system failures, minimize sanitary sewer overflows, comply with regulatory mandates, and ensure public health and safety.

The City allocates adequate resources for the operation, maintenance, and repair of its sanitary sewer system, by establishing a proper rate structure, accounting mechanisms, and auditing procedures to ensure an adequate measure of revenues and expenditures.

In addition, the City has stringent design and construction standards for new or rehabilitated infrastructure, with an inspection program that ensures city standards are adhered to. 23 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
24 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 2
2 Organization
D.13. (ii) The SSMP must identify the Legally Responsible Official or authorized representative as described in the Order. It must list and identify the organization positions responsible for operating and maintaining the sanitary sewer collection system including names and telephone numbers for management, administrative and maintenance positions, and the chain of communication for reporting SSOs.

2.1 Legally Responsible Official (LRO)
The City of Roseville has identified the Wastewater Collection Superintendent, and the Wastewater Process Engineer as the LRO or authorized representatives for the wastewater collection division. Historically, the Wastewater Collection Superintendent is responsible for the certification of SSO reports involving Roseville’s wastewater collection system.

2.2 SSMP Responsibility Chart
The City of Roseville is a Council-Manager form of government in which responsibilities are vested in the City Council and City Manager. In this form of government, the City Council’s role is that of a legislative policy-making body, which determines local laws that regulate community life and determines public policy and gives direction to the City Manager. The City Manager administers the affairs of the city government in a business-like and prudent manner. In addition, the position descriptions for SSMP responsibility are included in the following chart:

SSMP Element Responsible Position
I. Goals
Responsibility for the divisions goals resides with the WWC Superintendent. However, goals for the wastewater collection division are developed through collaboration between the WWC Superintendent, the WWC Supervisor and field crews.

II. Organization
The Environmental Utilities (EU) Director recommends any updates to the City Manager for organizational structure within the Wastewater Collection Division
III. Legal Authority
The City Manager, City Attorney and Roseville City Council ultimately uphold city ordinances within the Roseville
Municipal Code.

IV. Operations &
Maintenance
The Wastewater Collection Superintendent has overall
responsibility for the operation and maintenance of the collection system. The Asst. EU Director oversees, recommends, 25 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
and administers the O&M budget. EU Engineering provides support through the GIS Division for up-to-date mapping of the system
V. Design and
Construction
Standards
The Development Services Division and EU Engineering
collaborate to identify and maintain the design and construction standards. Development Services Division manages the
inspection of all new development, CIP and infill projects to ensure all standards are met. All projects receive EU Director approval related to Utility work.

VI. Overflow
Emergency
Response Plan
The Wastewater Collection Superintendent and Supervisors maintain the SSO emergency response plan. The plan is
implemented as an annual training, where revisions to the plan may be made based on field crew feedback.

VII. FOG Control
Program
The Wastewater Collection Superintendent and Supervisor identify hot spots from Food Service Establishments (FSE) and maintain an effective cleaning PM schedule to eliminate SSOs.

The FOG Control Program including permitting of FSEs,
inspection of facilities and monitoring pump out records is administered by the Wastewater Collection Superintendent.

VIII. System
Evaluation and
Capacity
Assurance Plan
EU Engineering Principal Engineer administers the SECAP program to ensure the hydraulic model is up to date, and to assure capacity for current and future development
IX. Monitoring,
Measurement
and Program
Modifications
The Wastewater Collection Superintendent with assistance from the Wastewater Collection Supervisors monitors the
implementation and assesses the success of the overall SSMP elements. The superintendent tracks Key Performance
Indicators and adjusts programs as needed.

X. SSMP Audits
The Asst EU Director is responsible for SSMP program audits, with assistance from the Wastewater Collection Superintendent and Principal Engineer for Wastewater Division
XI. Communication
Plan
The EU Public Information Officer communicates with the EU Director, City Manager, City Council, nearby agencies, and the public on the City’s SSMP monitoring and modifications
26 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

2.3 Chain of Communication Reporting Chart
Office hours for the WWC Division are Monday through Friday from 0630 to 1600, except for holidays. Either the Administration Technician or service call worker receives all service calls during regular business hours. If received in the office, a service request is created with the caller information, the problem, and contact information. This information is transferred to the service call worker, in which they respond, access the problem, and provide a solution. An answering service, contracted by WWC Division, receives all after-hours calls to gather information and dispatch to the on-call service worker via an assigned mobile phone. The on-call service worker is available 24 hours per day and is furnished with a service van and equipment to facilitate a timely response. A response time goal is 20 minutes during business hours and 40 minutes for after-hour service calls. The van is equipped with containment devices to manage lower lateral blockages and spills, and to prevent SSOs from entering a storm drain inlet or channel. Should the situation require additional resources, the on-call worker would contact crew members from the call-out sheet for assistance. Table 2-1, included in the division’s SSOERP, summarizes the chain of communication when receiving calls for service.

Table 2-1 SSO Chain of Communication
27 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
28 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 3
3 Legal Authority
D.13(iii) Each Enrollee must demonstrate, through sanitary sewer system use ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to(1) prevent illicit discharges into its sanitary sewer system, (2)require that all sewers and connections are properly designed and constructed, (3)to ensure proper access to portions of the lateral owned by the agency,(4) to limit the discharge of FOG, and(5) to enforce any violation of its sewer ordinances.

The Roseville Municipal Code (RMC), https://qcode.us/codes/roseville/. provides specific legal authority for the WWC division to operate and manage the wastewater collection system. The City’s current legal authority is established through existing codes, regulations, ordinances, and permitting procedures that allows the City to require and enforce various measures for ensuring the proper and efficient operation, management, and maintenance of the City’s wastewater collection system. Table 3-1 indicates the code section for the legal authority required.

Table 3-1 RMC Codes for Legal Authority
Legal Authority RMC Number Description
Ability to prevent illicit discharges into the
wastewater system

14.20.040 Definition of illicit discharge

14.26.010 Purpose and policy of industrial
wastewater
Ability to require all sewers and
connections are properly designed and
constructed

14.12.040 Building and sewer connection
requirements

14.14.030 FOG discharge permit required

14.14.070 Prohibitions for FSE construction
Ensure proper access to portions of the
lateral owned by the city
Charter Article X
Sec 10.01 General powers respecting utilities

14.14.290 Right of entry
Ability to limit the discharge of FOG 14.12.050 Use of public sewers

14.14.010 Purpose

14.14.030 FOG discharge permit required

14.14.040 Fog discharge limitation

14.14.070 Prohibitions

14.14.120 Interceptor maintenance requirements
Ability to enforce all sewer ordinances 14.12.060 Sewer use- enforcement authority

14.14.330 FOG – determination of non-compliance

14.14.350 FOG- Permit suspension or revocation

14.14.360 FOG- penalties and violations
29 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

3.1 Industrial Pretreatment Program
In addition to the RMC, the City of Roseville Industrial Waste Division (IWD) oversees and administers the Pretreatment Program Enforcement Response Plan (ERP). This plan outlines operational procedures intended to ensure that the Significant Industrial Users (SIUs), and the small Commercial/Industrial dischargers to the sanitary sewer system are appropriately permitted and monitored. To assure compliance by these dischargers, the IWD implements enforcement procedures specified by the U.S. Environmental Protection Agency (EPA) in accordance with 40CFR 403.5 (f) (5). The ERP specifies criteria by which IWD personnel determine the enforcement action most appropriate to the nature of the violation. The Pretreatment Enforcement Response Plan is attached to the SSMP as Appendix 3-1.

3.2 Design and Construction Standards
The City of Roseville’s design and construction standards regulate and guide the design and preparation of plans and construction of the City of Roseville’s sanitary sewer systems and related public improvements, and set guidelines for all private works, which involve related improvements. Design and construction standards are located at https://www.roseville.ca.us/cms/One.aspx?portalId+7964922&pageId=8754129

3.3 Sewer Access Authority
The RMC section 10.01 states the City shall possess all powers granted to cities by state law to construct, condemn, purchase, acquire, add to, maintain, and operate, either within or outside its corporate limits, including, but not by way of limitation, public utilities for supplying water, light, heat, power, gas, transportation, sewage and refuse collections, treatment and disposal services, or any of them, to the municipality and the inhabitants thereof; Each city-owned utility shall be financially self-sufficient, and shall fully compensate the city general fund for all goods, services, real property and rights to use or operate on or in city-owned real property.

3.4 Fats Oils and Grease
The City of Roseville limits the discharge of Fats, Oils and Grease from Food Service Establishments through Section 14.14 of the RMC. Section 14.14 was adopted to facilitate the maximum beneficial use of the city’s sewer services and facilities while preventing blockages of the sewer lines resulting from discharges of fats, oils, and grease (FOG) into the public sewer, and to specify appropriate FOG discharge requirements for food service establishments (FSEs). Section

14.14 establishes conditions for permitting, inspection, pumping and recordkeeping, and right of entry for inspection.
30 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

3.5 Regulation of Sewer Use -Enforcement
Sections 14.12.060 and 14.14.360 (FOG Ordinance) of the RMC prescribes the enforcement actions available to the city when violations of the code are discovered. Violation of the RMC may be charged as either an infraction or misdemeanor upon discretion of the City Attorney.

3.6 Inter-Agency and Satellite Agreements
The City of Roseville operates two Regional Wastewater Treatment Facilities where sewer from satellite systems flow into City wastewater mains. As such, the Environmental Utilities Department maintains the following agreements to address regional and satellite systems.

3.6.1 Joint Exercise of Powers Agreement South Placer Wastewater Authority The purpose for this agreement is to provide for planning, acquisition, financing, ownership, construction, and operation of Regional Wastewater Facilities. The participants in the SPWA create a public entity which is separate from the City, the District, and the County. The SPWA services the areas the City of Roseville, Placer County and South Placer Municipal Utility District. The agreement is attached to the SSMP as Appendix 3-2.

3.6.2 South Placer Wastewater Facilities Operation and Use Agreement The agreement known as the Joint Powers Agreement, supersedes all other previous agreements.

The new agreement indicates the City of Roseville shall operate and maintain Regional Wastewater Facilities for the mutual benefit of and provide wastewater treatment services to the areas depicted on Exhibit A, areas which are within the jurisdictional boundaries of the City, District and County, so long as the District and County pay the City their proportionate shares.

This agreement is attached to the SSMP as Appendix 3-3

3.6.3 Contract and Operating Agreement between SRCSD and SASD This agreement between the City of Roseville, Sacramento Area Sewer District and Sacramento Regional County Sanitation District defines points where flows enter and exit each other’s area of service and points of demarcation for City and County assets. In addition the agreement is to meet regulatory requirements and provide a basis for SASD, SRCSD and the City of Roseville to work together to provide service to users, establish operation and maintenance responsibilities and outline rates and fees. This agreement is attached to the SSMP as Appendix 3-4

3.7 Appendix 3- Legal Authority Documents
3-1 Pretreatment Program Enforcement Response Plan – TOC 3-2 Joint Exercise of Powers Agreement for the South Placer Wastewater Authority 3-3 Agreement Regarding the Operation and Use of the South Placer Regional WW Facilities 3-4 Wastewater Service Agreement by Contract & Operating Agreement Between SASD, SRCSD and City of Roseville.
31 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
32 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 4
4 Operation and Maintenance
D.13.(iv) The SSMP must include those elements listed below that are appropriate and applicable to the enrollee’s system. This chapter describes the city’s activities regarding mapping systems of the sanitary sewer system, operation and preventative maintenance activities, rehabilitation and replacement program, training program, and equipment and critical part inventories.

The Operation and Maintenance (O&M) Program is essential to fulfill the city’s duty to serve the residents and businesses of the City of Roseville. It is also the most significant part of the city’s effort to eliminate the occurrence of SSOs and stay compliant with the general order.

The city’s O&M program is comprised of these elements:

1. Collection System Mapping

2. Preventive Maintenance

3. Rehabilitation and Replacement

4. Staff Training and Certification

5. Equipment And Replacement Parts Inventories, Including Critical Replacement Parts

4.1 Collection System Maps and Information
The WWC Division maintains an up-to-date electronic map of the wastewater collection system as required by Section D.13(iv)(a) of the Order. The City uses ESRI GIS software to map all utilityrelated data. The GIS map platform, referred to as Roseville GeoViewer, shows all gravity main segments with the direction of flow, manhole information, pumping facilities, pressure pipes, and valves. In addition, the GeoViewer allows users to turn on/off different layers and base maps to display the information they need. Additional map layers available in GeoViewer include:
• Hot Spot Locations
• CIPP Lined Mainline Segments
• Food Service Establishments and Grease Removal Devices • Waterways
• Roadways
• City Boundaries
• Stormwater System
Table 4-1 shows the GIS map system, and how it incorporates each of the sewer shed basins within the City of Roseville’s jurisdictional boundaries.
33 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.1.1 Map Update Policy
This policy aims to provide uniformity in identifying, verifying, documenting, and tracking the changes to the sewer mapping system. In addition, this document will describe the process in which the mapping system shall be updated.

A significant effort is placed upon maintaining a very complete, accurate, and up-to-date wastewater collection map which is an essential component for the proper operation and maintenance of a wastewater collection system. Maps are updated as new sub-divisions are accepted or when field crews repair, rehabilitate or replace components of the system that require updating the maps. A mapping update policy has been developed to address procedures that ensure mapping updates or revisions are correct and completed in GIS.

CCTV crews identify discrepancies between existing system maps and real time field data. The operator shall note the discrepancies and submit changes to the WWC Supervisor when differences are identified.

Construction and Maintenance crews identify any new infrastructure added to the system.

Information required for CMMS Map Change will be directed to the WWC Supervisor. The information required for Mains, Laterals, and SMH’s are:
• Mains - Grid map area, the distance between SMH’s and pipe size, pipe material • Laterals –Grid map area, C/O location, length, depth, pipe size, material, and depth.

Table 4-1 Wastewater Grid Map
34 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
• SMH – Grid map area, depth, barrel diameter, access cover size and material, number of and pipe size of inlets and outlets, barrel lining/coating, drops Y/N.

The Supervisor will create a work order in Maximo listing the Classification as “Map Change.” Then select “Log” and “Add Row” to add a description of the asset that needs to be added/changed. In the Log section of the work order, the Supervisor will list all the details gathered from the field and attach a map if required. Do not change the status of the work order in Maximo CMMS.

The GIS group automatically receives all map change requests. Once all map changes are updated, the Supervisor will receive an email informing them of the completed work order, at which time the GIS group closes the work order.

4.2 Operation and Maintenance
The WWC Division’s O&M program focuses on eliminating sewer backups and overflows, increasing the lifespan of the infrastructure, and bringing uninterrupted service to the residents of Roseville. WWC division provides service to 146,875 customers. Within the 43.05 square miles of Roseville, the City inspects and maintains 17 lift stations, approximately 578 miles of sewer mains ranging from 6- to 84- inch diameter, and 293 miles of lower laterals. Table 4-2 below represents a few performance indicators the WWC division tracks and measures their performance against.

Table 4-2. Operation and Maintenance Activities
FY 17-18 FY 18-19 FY 19-20 FY 20-21 FY 21-22
Total Miles of Pipe Cleaned 283.12 226.1 235.9 296.14
Total Miles of Pipe CCTV Inspected 100.24 149.64 117.11 66.45 Number of SSOs Caused by Hot Spots 0 0 0 0
Miles of Pipe Rehabilitated or Replaced 1.49 .5 .54 3.4 Total Number of SSOs Main and Lateral 25 31 32 51

4.2.1 Preventative Maintenance Program
The WWC Division of the Environmental Utilities Department is responsible for the City's sewer system and implements preventative and corrective maintenance approaches to operate and maintain the system efficiently. The division's PM program involves cleaning sewers on a recurring schedule, including regular CCTV inspection to determine the efficiency of those PM activities. The GIS system divides the city into grids, enabling targeted PM scheduling for an individual grid based on history, CCTV inspection, and infrastructure's age. The WWC division schedules cleaning as often as every three months or up to ten years, with the age and condition of the pipe being key factors. The scheduled maintenance projects that are identified in Maximo are attached as Appendix 4-1.
35 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Corrective maintenance projects and work orders are a concerted effort utilizing the PM and CCTV inspection programs. Information gathered during routine cleaning, repair work and inspection, generates the development of repair and replacement work orders. The following paragraphs describe the City's current operation and maintenance procedures for maintaining the wastewater collection system.

4.2.1.1 PM Cleaning Program
The WWC Division is equipped with three combination sewer cleaners to keep the sewer system operating efficiently and minimize line stoppages and calls for service. Sewer cleaning using hydraulic or mechanical methods performed on a routine basis helps remove accumulated debris in the pipe such as sand, silt, grease, roots, and rocks. Scheduled maintenance projects have been developed for each map grid based on historical data and field crew input.

4.2.1.2 Hot Spot Cleaning
In addition to scheduled maintenance, the WWC division aggressively cleans identified problem areas, known as hot spots. This list of hot spots has been compiled based on historical data, field crew observations, and CCTV condition assessments. These mainline segments tend to have more frequent backups due to sluggish flows, poor grade, and sags, The frequency of Hot Spot cleaning ranges from 1-6 months, depending on history and CCTV inspection data. The WWC division strives to reduce and eliminate these hot spot areas during CIP projects or rehabilitation projects performed by City crews. Currently, the WWC division has 276 segments identified as Hot Spots.

4.2.1.3 Electroscan Inspection
To identify and quantify locations of I&I entering the sewer system, the WWC division invested in Electroscan Technology, adding the equipment to a newer CCTV inspection truck. Using Electroscan, a probe is pulled through the mainline, and electricity is measured and used to identify any defect where the pipe may leak. This enables crews to pinpoint CCTV inspection of the pipe section before scheduling repair work to correct the deficiency. Electroscan has also proved valuable as a QA/QC tool for accepting Cured-In Place-Pipe rehabilitation projects. The city performed pre-post Electroscan inspections on sewer mains rehabilitated with CIPP technology. This pilot study proved the effectiveness of the Electroscan Technology in locating defects CCTV inspection didn’t identify.

4.2.1.4 CCTV Inspection Program
The WWC Division operates three CCTV vans to inspect the wastewater collection system. CCTV operators utilize NASSCO’s PACP coding format when inspecting sewer mains and laterals. All observations are coded and captured in the Granite Net Software system and are archived in a database for access. CCTV inspection crews also perform continual condition assessment inspections on existing infrastructure. For example, CCTV crews inspect mainline segments and lower laterals, looking for deficiencies to minimize problems within the collection system. In addition, sewer inspections identify unwanted connections and sources of I&I into the wastewater system. Finally, CCTV crews inspect new subdivisions or commercial projects before being accepted into the city and the time of warranty acceptance. These inspections are crucial to receiving infrastructure installed to City design and construction standards. Table 4-3 includes a sample CCTV report from GraniteNet inspection software. .
36 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Table 4-3 CCTV Inspection Report
37 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.2.1.5 Root Control Program
The WWC Division has an effective chemical root control program, using Vaporooter products to limit or eliminate root growth in the City-owned portion of the lower lateral. In addition, the WWC division has two qualified applicators licenses (QAL) that allow the division to chemically treat laterals for a more effective root control program rather than contracting out for this service.

This program has dramatically reduced the division's exposure to back injuries resulting from loading and unloading a gas-powered eel from the truck each time. It also lessens the element of crush injuries and trip and fall hazards from eel rods across the ground. In addition, chemical root control has successfully reduced the maintenance time per lateral, which is evident in the reduction of lower lateral backups and overflows.

4.2.1.6 Lift Station Inspection and Maintenance
The city currently has 17 neighborhood lift stations throughout its service area. All 17 stations are equipped with a duplex or triplex pumping system, with the lead/lag pump cycled based on pumping hours. Power outages happen very infrequently. However, all new lift stations and four of the currently active seventeen lift stations are equipped with a 4-hour emergency overflow storage basin. WWC crews inspect the stations monthly, cycle pumps through a pull-down sequence, test floats for operation, and record the condition and any deficiencies at the station. In addition, all Lift Stations are equipped with a SCADA system, which the WWTP operators monitor 24 hours per day. Besides inspections, City crews perform wet-well cleaning and de-ragging of pumps every six months to eliminate pump failures and potential odor complaints.

4.2.2 Corrective Maintenance Program
WWC construction crews perform all repair work to the existing infrastructure. Work orders and projects are developed from information found during maintenance activities, inspections based on calls for service and condition assessment inspection findings. The Corrective Maintenance programs are defined below.

4.2.3 Infrastructure Repair
The WWC Division performs routine, emergency, and complex repairs, and replacements to its existing infrastructure. This work includes sewer main installation and repair, sewer manhole installation, and lateral repair and replacements. As a result, city crews have undertaken large projects, installing new mainline segments that have eliminated hot spots, replaced aging infrastructure, and upsized mains to provide additional system capacity. In addition, the WWC Construction crew has performed contractor caliber work at the City’s Regional Wastewater Treatment Plant at significant cost savings for the city. 38 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.2.3.1 Infill Projects
Depending on their schedule and workload, the WWC division construction crew holds the first choice for any proposed connection to existing infrastructure. If city crews are busy, contractors will be allowed to perform the work under the direction of a city inspector. However, if city crews complete the work, the contractor will schedule the work through the WWC Supervisor. City crews will complete the work on a time and material basis for the contractor.

4.2.3.2 CIPP Lateral Lining
The vast majority of the city’s SSOs have occurred in the lower lateral, caused by breaks in the VCP and root intrusion. As a result, the city invested in the trenchless technology Cured in Place Pipe (CIPP), purchasing an LMK lateral lining trailer. Lateral lining through an existing cleanout makes it possible to repair and reinstate the pipe integrity without disturbing landscape, sidewalks, roadways and with minimal disruption of service to the resident. CIPP essentially creates a pipe within a pipe and eliminates further root intrusion and sewer overflows. During condition assessment, lower laterals are CCTV inspected, and work orders are created for those identified as viable for CIPP lining. These work orders are then prioritized based on history and the number of calls for service.

4.2.3.3 Cleanout Installation Program
The WWC Division invests many resources in preventing backups that potentially become SSOs.

Since the City owns the lower portion of the lateral, access to the lateral through a cleanout is imperative in assessing its condition. The WWC division has identified the homes and businesses throughout the city with no cleanouts and created projects to install one at every service location.

One installed, the lower lateral is inspected and if necessary, additional work orders for maintenance or repair are created. Currently, the city installs over 100 cleanouts per year on this project.

4.3 Rehabilitation and Replacement
The City began its condition assessment of the collection system in 2006. At that time, the collection system was divided into 24 groups based on the age of the sewer main installation. The first group of pipes and manholes were inspected and included in the Rehabilitation and Replacement plan developed shortly after. To date, City crews have completed inspections in 14 of those 24 groups, which has led to the development of numerous CIPP and replacement projects.

Over the past fifteen years, experience has shown that identifying and prioritizing areas and sewer segments for assessment and rehabilitation is complex. It requires the availability of tremendous amounts of data, expertise in applying PACP coding, and professional judgment. During this time, the WWC Division has significantly advanced its knowledge of the collection system and its sewer assessment and rehabilitation approach. The City has recognized that CCTV inspection is the best method for identifying and prioritizing problematic areas. As such, the City continuously inspects pipelines and utilizes NASSCO’s PACP coding standard to develop a list of assets that need rehabilitation. When defects are identified, the City evaluates the risk of failure and assigns a priority ranking to each asset.
39 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Prioritizing those assets relies on several factors, including:
• Severity and extent of the defects (PACP Score).
• Maintenance records and SSO occurrences
• Hydraulic capacity needs and projection.
• The estimated remaining useful life of the infrastructure This detail-oriented condition assessment approach enables the division to plan and design CIP projects to rehabilitate sewer infrastructure in a planned and organized manner. The supervisor will review the maintenance history of the main, any SSO history and determine if the segment should be rehabilitated or continue established preventative maintenance. The main will be added an asset group already created in Maximo CMMS if conditions warrant rehabilitation. Based on current condition, history of calls, and field crew observations, the assets are then prioritized for rehabilitation.

Once the asset group is established, the WWC Superintendent will meet with EU Engineering to review the data and create a CIP project for the upcoming fiscal year, based on priorities and estimated cost. This process ensures the projects will be completed timely, reducing the potential occurrence of an SSO.

In addition to condition assessment, the WWC division schedules with Public Works to inspect wastewater infrastructure ahead of residential and arterial street paving projects. This process enables the WWC division to perform necessary system improvements before completing the overlay project. The City maintains a 5-year list of planned R&R CIP projects

4.4 Training and Certification
One challenge when defining a training program is an influx of new employees. Entry-level employees with no training are a potential safety liability in the wastewater field. Training for new hires is predominantly on-the-job training, with classroom and online training finishing the remaining required training. As soon as available, new employees are scheduled for Confined Space Entry, Traffic Control &Flagging, and Excavation and Trench Shoring training, the division’s most significant safety liabilities.

4.4.1 New Hires
On their first day, a new employee will be issued a task booklet, which defines the necessary skills and training for their position. The new hire and Supervisor will go through the book, discuss how the employee will receive training, and receive sign-off on the tasks. The booklet covers all areas involving the wastewater collection system and is an aid in developing qualified, knowledgeable, and capable employees. When the employee becomes proficient in a task, the SR Utility Maintenance Worker or the crew leader signs and dates the book, verifying they have observed the employee satisfactorily complete the task. The training defined in the task booklet is provided through various methods, mainly on-the-job training, and begins the first day on the job. Finally, at the end of the probationary period, new hires are put through a series of activities to demonstrate their proficiency in all skills learned.
40 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.4.2 Training and Tracking
Safety training constitutes a significant portion of the training received each year and tracking individual completion of training can be insurmountable. The WWC Division utilizes a computerbased software program, Safety Plus Web (SPW), to monitor and track each employee’s level of completion. Supervisors can query individual employee training records, or the entire division, to see which courses need completion. In addition, SPW provides Competency-Based Training (CBT), requiring the employee to take and pass a test at the end of the presentation, demonstrating their understanding of the training material. In addition, Standard Operating Procedures (SOPs) have been developed for all equipment and procedures within the division to train new employees and provide a refresher for veteran employees. These SOPs are reviewed annually during a safety meeting and revised should there be a process change. Therefore, SOP development and training is an ongoing process.

The WWC division holds weekly safety meetings where supervisors or subject matter experts present safety topics specific to the wastewater collection field. These meetings are interactive with the crews and presenters and are great learning opportunities. In addition, the training course is added to SPW, so employees can fulfill the training online if they are absent. Finally, as new training requirements are developed, they are implemented into SPW to ensure all employees receive the required training throughout the year. Table 4-4 lists the required training specific for the WWC division.

Table 4-4 Wastewater Collection Required Training
Training Title Frequency Delivery
Asbestos Cement Pipe Training Initial and Refresher Initial- 1X Refresher-Annual Outside Trainer
Back Safety Annual CBT or Tailgate
Backhoe Operator Certification Refresher-3 Yrs. CBT, Classroom, Hands-On
Bloodborne Pathogens Training Annual CBT, Classroom
Confined Space Entry-Permit Required Annual
Outside Trainer
CBT, Classroom,
Hands-On
Crystalline Silica Standard Annual CBT, Classroom
Defensive Driving Annual CBT, Classroom
Dry Creek Emergency Action Plan Annual CBT, Classroom
Excavation, Trenching and Shoring Initial
Refresher- Annual
Outside TrainerInitial, CBT,
Classroom
Fall Protection Plan Initial and Refresher Initial-1X
Refresher-3 Yrs. CBT, Classroom
Fire Extinguisher Training Initial -1X
Refresher- Annual CBT, Classroom
First Aid, AED and CPR Training Initial
Renewal -Annual
Outside Trainer,
Classroom
41 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Gas Detector Training Annual Outside Trainer,
CBT, Classroom
Hazard Communication Initial
Annual Refresher CBT, Classroom
Hearing Conservation Annual CBT, Classroom
Heat Illness Prevention Annual CBT, Classroom
Injury and Illness Prevention Plan Annual CBT, Classroom Lock Out Tag Out Initial CBT, Classroom
Personal Protective Equipment Initial CBT, Classroom
Respiratory Protection Plan Annual CBT, Classroom
Sanitary Sewer Overflow Emergency Response (SSOERP) Annual CBT, Classroom Sewer System Management Plan Annual CBT, Classroom
Traffic Control and Flagging 1X
Refresher- 3 Yrs. Outside Trainer
Underground Utility Locating Annual CBT, Classroom,
Outside Trainer
Violence in the Workplace Annual CBT, Classroom

4.4.3 Certification
The CWEA Technical Certification Program provides certification in various wastewater disciplines to promote the knowledge and skills of wastewater professionals. The City requires employees to take and pass the Collection System Operator Grade I test to be eligible for promotion to the Journey Level. The test for the required CWEA certification ensures that employees who hold this certification possess the knowledge, skills, and abilities to perform the collection system operator duties skillfully. In addition, to renew the certificate, the employee must complete 12 hours of continuing education training every two years.

Information on CWEA certification can be found at http://www.cwea.org/

4.5 Equipment and Critical Spare Parts Inventory
The WWC division owns an assortment of maintenance equipment and vehicles equipped both for routine maintenance and emergency response. This equipment is maintained by the Vehicle Maintenance Division of Central Services. Table 4-5 lists the maintenance equipment the WWC division currently owns.

Table 4-5 WWC Equipment List
Qty Equipment Purpose
3 Mainline and Lateral CCTV Inspection Vans Inspection
3 Combination Hydro-Jetters PM, Emergency Response
1 Chain Flail Cutter 8”-20” diameter cleaning PM, Emergency Response 1 LMK Lateral Lining Trailer Repair
2 3 Axle Dump Truck Emergency Response, Repair
2 Caterpillar 430 Backhoe Loader Emergency Response, Repair 1 John Deere 210 Skip Loader PM, Emergency Response, Repair 42 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.6 Critical Spare Parts
Wastewater Collection is a division of the Environmental Utilities Department, which encompasses Regional Wastewater Treatment Plants, Mechanical Maintenance, Water Distribution, Technical Services Engineering, and Solid Waste Division. The WWC Division operates, inspects, and maintains the lift stations within the boundaries of the City of Roseville, however, all electrical and mechanical maintenance tasks are performed by the PM Technicians from Mechanical Maintenance Division. The Materials Technician maintains the WWC Division’s inventory list and re-order levels at Dry Creek WWTP. The list of critical spare parts is in Table 4-6.

Table 4-6 WWC Critical Spare Parts
1 Caterpillar 304 Excavator Emergency Response, Repair
6 Ford F-550 Crew Truck w/ Service Body; Fully equipped Emergency Response, PM, Repair 1 6-inch Trailer mounted trash pump, cam lock fittings Emergency Response, Repair 1 4-inch Trailer mounted trash pump, cam lock fittings Emergency Response, Repair 165’ 6-inch suction hose, cam lock fittings Emergency Response, Repair 400’ 6-inch discharge hose, cam lock fittings Emergency Response, Repair 40’ 4-inch suction hose, cam lock fittings Emergency Response, Repair 3 6’-10” pass through air plug, cam lock fitting Emergency Response, Repair 3 10”-16” pass through air plug, cam lock fitting Emergency Response, Repair 3 15”-21” pas through air plug, cam lock fitting Emergency Response, Repair 2 10” pass through plug, threaded end Emergency Response, Repair 1 10’ x 9’ aluminum shore box Emergency Response, Repair 2 10’ x 4’ aluminum shore box Emergency Response, Repair 2 End Shores 24” to 42” Emergency Response, Repair
5 22”-36” Speed Shore 5’ length Emergency Response, Repair 4 28”-45” Speed Shore 7’ length Emergency Response, Repair 6 22”-36” Speed Shore 7’ length Emergency Response, Repair 6 48” x 96” Fin-form Plywood Emergency Response, Repair EU
Name PLC Model Pumps Fuses Level Control
Comm
Connection HMI Heater/Overloads
WC06 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
Fiber PA-200 Optimate
OP-620 Installed/Warehouse
WC07 Koyo D2-250 2-Installed On Site
Transducer/
Floats -
Warehouse
GE MDS SD4 Optimate
OP-620 Installed/Warehouse
WC08 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC09 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC11 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
43 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4.7 Appendix 4- Operation and Maintenance Program Documents Appendix 4 includes the following documents:
4-1 Maximo PM Scheduled Maintenance
4-2 Tech Memo O&M Program SSMP Audit- Rehabilitation and Replacement Plan WC13 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC14 Modicon
M340 N/A On Site
Transducer/
Floats -
Warehouse
GE MDS SD4 SE Maguells
HMISTU855 N/A
WC15 Modicon
M340 N/A On Site
Transducer/
Floats -
Warehouse
GE MDS SD4 SE Maguells
HMISTU855 N/A
WC16 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC17 Koyo D2-250-1 2-Installed/
1-warehouse On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC19 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC22 Koyo D2-250-1 2-Installed/
1-warehouse On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC23 Modicon
M340
2-Installed/
1-warehouse On Site
Transducer/
Floats -
Warehouse
Proxim Radio to
PG. Future Fiber
PA-220r
SE Maguells
HMISTU855 Installed/Warehouse
WC24 Koyo D2-250 2 +
1-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC25 Koyo D2-250 2-Installed On Site
Transducer/
Floats -
Warehouse
GE MDS SD4 Optimate
OP-620 Installed/Warehouse
WC26 Koyo D2-250 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
WC28 Koyo D2-250-1 2-Installed On Site
Transducer/
Floats -
Warehouse
MDS 4710A Optimate
OP-620 Installed/Warehouse
44 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
45 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 5
5 Design and Performance Provisions
D.13.(v) Design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations and other appurtenances; and for the rehabilitation and repair of existing sanitary sewer systems; and (b) Procedures and standards for inspecting and testing the installation of new sewers, pumps, and other appurtenances and for rehabilitation and repair projects.

5.1 Sanitary Sewer Design Standards
The purpose of the City Design Standards is to provide direction in the application of improvements that are to be dedicated to the public and accepted by the City for maintenance or operation and to provide for joint development of those facilities to be used by and for the protection of the public. This includes certain private works and improvements to be installed within existing City rights-of-way and easements. Whereas these Standards intend to govern all new construction, City staff shall interpret and apply the Standards in a manner that achieves their intent while encouraging and enabling the redevelopment of infill and vacant parcels, especially within the City’s Redevelopment Project Area. These Standards shall apply to, regulate, and guide the preparation of traffic impact studies and the design and preparation of plans for construction of streets, highways, alleys, drainage, sewerage, traffic signals, site access, water supply facilities and related public improvements, and shall set guidelines for all private works which involve drainage, grading, trees, and related improvements. The City’s sewer Design Standards are located on the City’s website at
https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_7964838/File/Government/Departments/Develop ment Services/Engineering/Design and Construction Standards/2020 DS Sections/DS - SECTION 9 - Jan.2020.pdf.

5.2 Sanitary Sewer Construction Standards
The purpose of the City Construction Standards is to provide minimum standards to be applied to improvements which are to be dedicated to the public and accepted by the city for maintenance or operation and certain private works, as well as improvements to be installed within existing rightsof-way and easements. This is necessary to provide for coordinated development of required facilities to be used by and for the protection of the public. These Construction Standards shall apply to, regulate, and guide construction of streets, highways, alleys, drainage, sewerage, traffic signals, site access, water supply facilities and related public improvements, and shall set guidelines for all private works which involve drainage, grading, trees and related improvements.

The City’s sewer Construction Standards are located on the City’s website at https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_7964838/File/Government/Departments/Develop ment Services/Engineering/Design and Construction Standards/2020 CS Sections/CS - SECTION 91 - Jan.2020.pdf
46 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
All improvements within the City rights-of-way shall be installed in accordance with the approved improvement plans and specifications, the City of Roseville Design Standards, the City of Roseville Construction Standards, and the State of California Department of Transportation Standard Specifications.

5.3 Sewer System Construction and Performance Testing
Section 91-12 of the City’s Sanitary Sewer Construction standards defines the criteria for testing of installed sewer improvements. Sewer mains, services, manholes and appurtenances shall be tested by the following procedures.

5.3.1 Testing Of Installed Improvements
A. Sewer Mains and Services – Public and private sewer mains and services shall be air-tested per ASTM C828 by the Contractor and the Environmental Utilities Department shall provide closed circuit TV inspection, after installation of the joint trench utility crossings and subgrade elevations have been met. Additionally, pipeline segments beneath road bases to be lime- treated shall be tested before and after the lime treatment process.

B. Air Pressure Test – Sewer mains and laterals shall be pressure tested in accordance with the National Clay Pipe Institute recommended guidelines with the following amendment:

1. The minimum test time shall be 60 seconds. The section of a sewer being tested must be pressurized to 3.5 psi, and during the test time must hold 2.5 psi or greater, or the section has failed.

2. For mains installed in an area where the water table is higher than the pipe, the test pressure shall be increased 0.5 PSI per foot of water over the pipe.

3. The test gauge shall be liquid-filled, capable of testing up to 15 PSI, and graduated to 1/10 PSI.

C. TV Inspection – TV inspection of sewer mains and services shall be performed by the Environmental Utilities Department, Wastewater Division. Costs for said inspection shall be borne by the Contractor. Preliminary inspections may be performed by outside contractors but shall not be accepted by the Environmental Utilities Department as an official record.

1. The sewer system shall be completely cleaned by an approved method prior to TV inspection. The sewer system shall be rejected if any of the following conditions exist:
a. For main lines 12 inches and smaller - standing water or sags greater than 1⁄2 inch in depth at acceptance or greater than 1 inch at warranty. b. For main lines exceeding 12 inches - standing water or sags greater than 3⁄4 of an inch in depth at acceptance and greater than 1 1⁄2 inches at warranty. c. Standing water in services.
d. Offset joints.
e. Joint separations greater than 1⁄2 inch wide.
f. Damaged pipe.

D. Inspection Criteria for Coated Ductile Iron Pipe – All ductile iron sewer will have the following additional inspection requirements:
47 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

1. The condition of the barrel section of pipe as well as 360◦ at each joint shall be recorded to a DVD or portable drive. Once completed, and the inspection demonstrates the pipe meets the City’s construction standards, the contractor may proceed with the backfill of the trench. The Contractor shall provide the DVD and a map of the section inspected, to the Wastewater Collection Division for review prior to the City’s acceptance inspection.

2. Upon finding any deficiency in the pipe which does not meet the design and construction standards of the City of Roseville, it is strongly encouraged that the contractor makes the necessary corrections at that time. If deficiencies aren’t corrected City forces at time of acceptance CCTV will identify these deficiencies and require the contractor to dig and replace the pipe sections; there will be no exceptions.

3. The observation data on the DVD provided to the City shall include the following:
a. City wide job number.
b. Encroachment permit number.
c. Project name.
d. Location (street name)
e. Manhole numbers (based on approved plan set or city asset numbers if applicable). f. Direction of inspection (upstream or downstream).
g. Date of inspection.

4. The speed of travel shall be slow enough to inspect each pipe joint, wye connection, coating integrity, and potential sags. Camera speed should travel at a rate of no more than 30 feet per minute. The camera speed shall be steady and slow enough to record features and defects.

E. Manholes – Sewer manholes shall pass a vacuum test consisting of the following criteria and procedures:

1. The test shall be performed after assembly of the manhole and installation of the pipe entering or exiting the manhole, but prior to backfilling. The Contractor shall perform the test and supply all test equipment. The Development Services Inspector shall witness the test results.

2. Lift holes shall be filled with non-shrink grout prior to testing.

3. Pipe entering and exiting the manhole shall be plugged. The plug shall be places on the flex joint outside of the manhole base. Securely brace the plugs to prevent them from being drawn into the manhole. Unused channels shall be permanently plugged with a plastic or clay stopper.

4. A vacuum of 10 inches of mercury shall be drawn to start the test. The amount of time required for the vacuum to drop to 9 inches shall be measured. The manhole will pass the test if the amount of elapsed time is greater than 60 seconds for a 48-inch manhole, 75 seconds for a 60-inch manhole, 90 seconds for a 72-inch manhole and 120 seconds for an 84- inch manhole. A liquid-filled vacuum gauge shall be used for testing. All detectable leaks shall be repaired with non- shrink grout while the vacuum is drawn. No mortar shall be applied to the inside of the manhole until the vacuum test has passed.

5. If the manhole fails the initial test, necessary repairs shall be made with a non-shrink grout while the vacuum is still being drawn. Retesting shall proceed until elapsed times are satisfactory.
48 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

6. After passing the vacuum test, all joints shall then be mortared, inside and out. Outside mortared joints shall be allowed to dry 24 hours or as approved by the Development Services Inspector before backfilling.

7. If damage to the manhole is evident any time during the construction, the Development Services Inspector may require repairs to be made on the manhole which will require a new vacuum test prior to acceptance.

8. Topside Improvements – When all water, recycled water and sewer infrastructures have passed air, vacuum, pressure, and continuity test as well as CCTV inspection the Development Services Inspector will email a notification to internal departments indicating that the project is ready for road bases and top side improvements only. This does not constitute approval for use of the infrastructure.

9. Tying Into the City System – A tie-in procedure shall be submitted and approved by the Environmental Utilities Department prior to the proposed work. The contractor shall allow for up to 7 days for review of the procedures by the Environmental Utilities Department.

The sewer system shall be tied into the City system within 10 working days upon completing and passing all the testing procedures. Tie-ins shall be conducted as specified in Section 91- 2 of the Construction Standards.

5.3.2 Punchlist Process
After the sewer manholes have been raised and finished to grade, the sewer system shall have a final ball and flush in the presence of the Development Services Inspector. The system shall then have a final TV inspection to ensure the entire sewer system is intact for warranty. Final ball and flush can be done by city forces on a time and material basis at the request of the contractor.

When all improvements are complete, the contractor shall provide a written request for a punch list inspection of the improvements. With the assistance and presence of the Contractor, the wastewater facilities punch list shall be generated by the Development Services Inspector and Wastewater Collection Division.

5.3.3 Repairing Installed Improvements
Sewer mains, services, manholes and appurtenances shall be repaired per these Construction Standards and by the following procedures.

A. Repairing Vitrified Clay Pipe

1. Damaged pipe shall be exposed and replaced in-kind by “bridging” the new pipe into place. Coupling devices shall not be used.

2. Sagging or misaligned pipe shall be exposed and corrected in place if possible. If the pipe is defective, then a new pipe shall be bridged in place.

3. After the correction has been completed, the excavation shall be backfilled and compacted to grade as specified. The repairs shall then be retested per section 91-12 of these Construction Standards.
49 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
50 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 6
6 Overflow Emergency Response
D.13. (viii) The enrollee shall develop and implement an overflow emergency response plan that identifies measures to protect public health and the environment. The plan must include (a) proper notification procedures so primary responders and regulatory agencies are informed in a timely manner, (b) a program that ensures an appropriate response to all overflows, (c)procedures to ensure prompt notification to regulatory agencies or other potentially affected entities of all SSOs that potentially affect waters of the State. All SSOs shall be reported in accordance with the MRP and WDR requirements, (d)procedures to ensure appropriate staff and contractor training on the ERP,(e)procedures to address emergency operations, such as traffic and crowd control,(f) a program to ensure all reasonable steps were taken to contain and prevent discharge of sewer to waters of the United States, and to minimize and correct any adverse impact on the environment from the SSO.

6.1 Notification Procedures
The WWC division maintains an Overflow Emergency Response Plan that covers the wastewater system and Lift Station response and procedures. Table 6-1 summarizes the response procedures.

Table 6-1 SSOERP Flowchart
51 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
The WWC division strives to operate, manage, and maintain all parts of the sanitary sewer system to prevent SSOs and mitigate the impacts quickly and efficiently should an SSO occur. The On-Call emergency vehicle contains a three-ring binder that includes the division’s SSO emergency response manual, the response plan, chain of communication, and notification procedures. In addition, the truck is equipped with the necessary tools and equipment to control and contain overflows and clear lower lateral blockages. The truck is outfitted with pneumatic plugs, rubber berms, and dry sweep, all of which are effective means of containment. Table 6-2 summarizes the division’s notification procedures.

Table 6-2 Notification Guide
If SSO And Affects Notify
Discharges 1,000
gallons or greater to
surface water or
spilled in a location
where it will
probably be
discharged to a
surface water, shall,
as soon as possible,
but no later than two
(2) hours after
becoming aware of
the discharge
Sacramento River
Enters structure,
requires cleanup
• WWC Supervisor- Shane Rodgers
Office -916-746-1894 Cell -916-223-7711
• WWC Supervisor – Kevin Ryan
Office – 916-746-1895 Cell- 916-223-7537
• WWC Superintendent – Dan Pruden
Office – 916-746-1891 Cell- 916-580-5600
The individuals above are responsible for notifying:
• OES 1-800-852-7550
Obtain control number, complete field spill report
form
Additional Numbers for Reference
• Placer County Environmental Health
1-530-745-2300 Main Line
1-530-745-2306 After Hours Supervisor
• California Department of Fish and Wildlife
916-445-0045 Option #2
• Sacramento River Water Treatment Plant
916-808-4961
916-264-5011
• City of Roseville- Risk Management
916-774-5420 or 916-774-5202
After hours- Dave Rawe 209-613-9448
If no answer, authority is for cleanup only
from Restoration Companies listed in SSOERP
52 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

6.2 Emergency Response Procedures
City of Roseville Wastewater Collection has developed the following procedures for responding to Sanitary Sewer Overflows (SSOs). The purpose of these procedures is to ensure that all SSO responses are conducted efficiently and effectively, meeting all regulatory requirements of the general order.

6.2.1 Goals of SSOERP
The purpose of this SSOERP is to ensure that the City of Roseville Wastewater Collection personnel follow established guidelines in cleaning up and decontaminating SSO’s which have occurred within the City’s collection system service area. The goals with respect to responding to SSO’s are:

A. Respond quickly to minimize the extent of the SSO;
B. Eliminate the cause of the SSO;
C. Contain the spilled wastewater to the extent feasible.

D. Eliminate public contact with the SSO;
E. Mitigate the impact of the SSO; and
F. Meet the RWQCB Monitoring and Reporting requirements

6.2.2 Investigate and Assess Problem (WWC Personnel)
Assessment starts with the phone call from the customer. Advise customer to stop all use of water in the home or business. Obtain as much information from customer as possible. Relevant information includes:
• Description of problem
• Specific location (e.g. manhole in street, front or back of property, cleanout box)
• Time the possible SSO was noticed
• Any other observations from the caller (e.g. odor, duration of spill, currently spilling)
o If you believe an active spill is occurring, mobilize a hydro-vac prior to arriving to access the call.

The City staff person that arrives first to the scene, is considered the First Responder. Upon responding, city staff member performs a quick assessment of the overflow to determine the extent of the overflow.

The First Responder is responsible for the following:
• Requesting additional wastewater crews or other personnel as needed • Notification of Superintendent/Supervisor in the event of Category 1 or 2 SSOs
53 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
• All field documentation including pictures of the SSO and final field spill report.
• Protection of the health and safety of the public by preventing contact with the SSO
The first responder shall:

A. Locate SSO by address, cross street and point of overflow (i.e. manhole, cleanout, pump station, broken pipe). Note time call was received, as well as time of arrival. See Appendix A for documenting start time of SSO.

B. Determine the current magnitude of the SSO

1. Flooded Structure? - See Appendix B

2. Storm water inlet or drainage way

3. Potential for public exposure

4. Related problems
i. Is overflow related to a street collapse?
ii. Is overflow related to construction work?
iii. Is overflow causing a traffic hazard such as displaced manhole cover or street flooding?

5. Provide initial estimate of overflow rate using pictures and tables (see tab 6 for spill estimation)

6. If SSO is a category 1 or 2 spill, notify WWC Supervisor or Superintendent as soon as possible, then refer to Sec. II and start containment

7. If SSO is category 3 spill, refer to Sec II, and start containment

8. Spill categories are defined below:
i. Category 1 – spill is defined as any amount of wastewater resulting from a failure or flow condition that reaches surface water or a drainage tributary to surface water.
ii. Category 2 –defined as discharges of wastewater of 1,000 gallons or greater, resulting from a failure or flow condition that do not reach surface water or a drainage channel or storm system unless the entire SSO discharged has been fully captured and disposed of properly iii. Category 3 – spill is defined as all other discharges of wastewater resulting from a failure or flow condition in the enrollee’s system. 54 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
NOTE: Superintendent or his designee will handle all notification to regulatory agencies regarding the reportable SSO.

C. If SSO reaches surface water or drainage channel tributary to surface water, and is 50,000 gallons or greater, sample receiving water to obtain baseline data. Refer to Appendix C for sampling information.

6.2.3 Contain SSO (WWC Personnel)
The overflow must be contained. Containment becomes more difficult if the overflow reaches the storm drain system or drainage way, since the overflow can rapidly contaminate receiving waters, such as creeks, streams, rivers, and other water bodies. During dry weather, the storm drain system can be used to store the overflow, if it can be plugged downstream of the overflow point.

A. Options for containing overflow

1. Containment berm at catch basin or drain inlet

2. Rubber mats and sandbags at catch basin or drain inlet

3. Sandbags in gutter

4. Dig trench in ground

5. Dry sweep

6. Vactor
B. Overflow in building

1. If necessary, evacuate affected people

2. Advise customer to keep family members and pets out of contaminated areas, and not to track contamination throughout non-affected areas.

3. Notify Risk Management at 774-5420 or 774-5202 during business hours. After hours, of if no answer, contact Dave Rawe at 209-613-9448.

4. If adjuster or Risk Management can’t be reached, contact one of the approved restoration companies starting with:
i. Restoration Management Co. 800-400-5058
ii. Serv-Pro 916-632-2250

5. If Restoration Company arrives before the adjuster, authorize only emergency cleaning services only. Hand resident our camera and request them take pictures of affected area. Do not enter house.
55 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

6. If property owner declines cleaning services, request they sign and date the Declination of Clean Up Services Form.

C. Overflow into storm drain/drainage ditch

1. Trace overflow in storm drainage system to downstream end point.

2. Plug all affected storm drain outfalls or block the creek and channels to contain spill.

3. Turn off storm water pump station if available

4. Hydro mains and vacuum all water from storm drain basin and system.

D.If SSO is a Category 1 spill, post warning signs around containment area and follow directions from RWQCB Staff (Region 5) or Fish and Wildlife Staff.

E. Example equipment for containing overflows.

1. Overflow onto ground or into building structure.
i. Containment berm
ii. Sand bags
iii. Plastic sheets
iv. Dry sweep
v. Vactor

2. Overflow into a storm drain/drainage way
i. Pneumatic plugs
ii. Bypass pump
iii. Vactor
iv. Sandbags

3. Overflow at lift station
i. Vactor
ii. Bypass pump
iii. Emergency generator

4. Warning signs to post around contaminated area.

5. Begin preliminary notifications – Refer to SSO notification guide

6.2.4 Traffic Control (WWC Personnel)
Traffic control may be needed immediately to protect the health and safety of the public and/or maintenance staff. Typically, immediate traffic control is needed if 56 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
there is a street collapse or significant depression in the pavement that is related to the sewer, if the manhole cover is ajar, or if the overflow causes flooding of the street. Traffic control may be needed to prevent wastewater from being further dispersed and to protect the maintenance crew while containing the overflow and removing the blockage.

A. Provide traffic control per Cal Trans Work Area Traffic Control Handbook (WATCH)
B. If necessary, use other departments (i.e. Police/Fire, Public Works) to ensure proper traffic control.

C. Control public contact with the SSO by isolating the area with barricades, signs or traffic cones.

6.2.5 Correct Cause (WWC Personnel)
The cause of the overflow may be located a considerable distance downstream of the SSO in areas with flat terrain. During large storms, overflows can be caused by excessive I&I in the collection system. I&I can greatly increase the flow in a collection system and cause overflows from pipes that are only partially blocked.

I&I can also directly affect the hydraulic capacity of mainlines and lift stations.

Under these conditions, it may not be possible to stop the overflow, until the flows recede.

A. Locate cause of overflow

1. Sewer main
i. Check flow in manholes
ii. Blockage should be between a manhole with sluggish flow or surcharging and a manhole with very little flow or is dry.

2. Sewer service
i. Check flow in city cleanout. If cleanout is dry, and resident is still plugged, stoppage is located on private property, and is not the city’s responsibility.
ii. If no city cleanout exists, but the resident has a 4” private cleanout, run this private cleanout to clear the blockage. Once cleared, CCTV to determine the location of problem (Refer to Appendix D, Sec 6)
iii. If no city or private cleanout can be located, check mains, both upstream and downstream. If the main is running clear, notify 57 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
the resident the problem is on their side, and explain city cleanout policy
iv. If service line is on a dead end run, regardless if the cleanout is clear, clean the mainline segment with Vactor.

3. Lift Station
i. Check alarm status inside control panel for indication of problem.
ii. If power is present, but pumps aren’t operating, switch control to hand.
iii. If pumps operate in hand, refer to Lift Station Failure Procedure (Tab 10).
iv. If no power is present, contact Roseville Electric, determine remaining level in station, and contact Collection Personnel for assistance. Refer to Lift Station Failure Procedure (Tab 10) B. Clear Blockage

1. Sewer Main
i. Clear mainline blockage using Vactor from dry manhole. ii. Determine possible cause of blockage and note on Field Spill Report Form.
iii. Refer to SOP WWC-002 For Vactor

2. Service Line
i. Clear blockage using Gas powered EEL or Model C Electric Eel.

Refer to SOPs WWC-007 and 020
ii. Call additional personnel is assistance is needed.

3. If blockage cannot be cleared
i. Increase containment and initiate bypass pumping
ii. Perform CCTV inspection to determine potential problem iii. Dig and repair sewer line at blockage location
C. Lift Station

1. If no power is present :
i. Contact Roseville Electric to verify outage and time estimation of power being restored.
ii. Determine the wet well level and remaining downtime left at the station.
58 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
iii. If downtime exceeds the max allowable retention, contact collection system personnel, and request Vactor support. iv. If power outage is extensive, contact additional personnel for 2nd Vactor support.
v. Continue vacuuming wet well until power is restored, and lift station is running in auto.

2. If power is present, but pumps aren’t operating:
i. Attempt to operate pumps in “hand” position. If pumps do operate in “hand”, contact on call electrician, and continue to operate and monitor levels in the wet well.

3. If SSO is caused from force main failure, all power to lift station panel will be controlled using identified energy control procedures (ECP).

Wet well levels will continue to be monitored using Vactors or bypass pumping, until repairs can be made to force main.

4. If portable generation is needed at lift station, on call electrician needs to be present for the connection. All panels have external plugs and disconnects for portable generation connection. Each lift station location has a specific pre-made cable for generator connection.

6.2.6 Final Volume Estimate (WWC Personnel)
The final overflow volume is estimated to determine if additional reporting to regulatory agencies is required and for the City of Roseville’s records when reporting to CIWQS. A minimum of five (5) pictures are required for every spill response, and locations are noted on the field spill report. Place an object in the photo for contrast. The following methods are approved for determining the gallons spilled during an overflow event.

Eyeball Estimation- Estimate the overflow rate out of a clean out by estimating the time needed to fill up a known volume, such as a five-gallon bucket. Imagine the amount of water that would spill from this bucket. This method is useful on spills that occur on hard surfaces such as concrete or asphalt Measured Volume- The volume of most small spills that have been contained can be estimated using this method. The shape, dimensions and depth of the contained wastewater are needed. This information is used to calculate area and volume of the spills.

59 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

1. Determine the shape of the spill

2. Measure or pace off the dimensions. Measure the depth at several locations and calculate the average. Convert all dimensions to feet.

3. To calculate the area square footage, use the following:
a. Rectangle: Length (ft.) x Width (ft.)
b. Triangle: Height (ft.) x Base (ft.) x .5
c. Circle: Diameter (ft.) x Diameter (ft.) x .785
d. Multiply the area (sq. ft.) by the depth (feet), to get the volume in cubic feet. Multiply your volume by 7.48 to convert to gallons.

Not all SSO’s will conform to the shapes above. If this occurs, break the area up as much as possible into known shapes and calculate the volume in each.

Calculating large volume spills is challenging because the area and depth are difficult to measure, and chances are these spills are not fully contained. Several methods are available to determine the volume.

Flow Estimation Chart- The table below (Section 5 of the SSOERP binder) presents pictures with varying flowrates of sewage overflowing from a manhole. Estimate the overflow rate by comparing the overflowing manhole with the pictures shown below.

W
I
D
T
H

LENGTH BASE
H
E
I
G
H
T

DIAMETER
Original Spill Original spill
broken out into
three known
shapes
60 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Flow Rate and Duration- Overflow volume can be estimated by multiplying the overflow duration by the overflow rate. The overflow rate can be determined by pick hole or vent hole spill height (section 5, SSOERP binder), flow meter data, SCADA information and pump data from lift stations.

The overflow volume can be estimated with the following formula:

Volume (gal)= estimated flow rate (gpm) x duration of overflow (minutes) 61 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
The charts below represent measurement point and flow rates based off height of water column measured
Estimated Flow EDU Chart- This method can be used for overflows from residential properties when enough information has been gathered through interviewing the resident.

Be clear with your questions and explanation for the interview. Only interview residents from the household contributing to the SSO. The table below is based off our design criteria of 190 gpd. and is included on the Field Spill report. It is a quick way to estimate volume from small overflows.

Figure 3- Flow Rate Exiting MH Pick Hole
62 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Figure 4- EDU Flow Chart
Time Period
Estimated City Flow Rate Per EDU (190 gpd) Spill

A B C D E F
Gallons
Per
Period
Hours Per
Period
A÷B =
Gallons
Per Hour
C÷60 =
Gallons
Per Minute
Minutes
Spill Was
Active
D x E=
Gallons
Spilled Per
Period
6am -Noon 75 6 12.5 .21
Noon – 6pm 55 6 9.16 .15
6pm -
Midnight 50 6 8.33 .14
Midnight -
6am 10 6 1.67 .03
Total Estimated Spill Volume
However, if a large spill occurs with multiple homes, commercial or mixed-use involved, and there isn’t sufficient information to calculate an estimate, use the City of Roseville Design Standard 9-2, Average Dry Weather Unit Flow Factors chart below. Count the units that are affecting the overflow and multiply by the flow factors on the chart below based on the land use designation
63 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

6.2.7 Initiate Cleanup (WWC Personnel)
Disinfection of contaminated soil or drainage ways is only performed when directed by appropriate agencies such as Placer County Environmental Health and CA Dept of Fish and Wildlife
A. Flooded building or structure

1. If building or structure is flooded due to a failure in the city’s collection system, contact Risk Management or Dave Rawe after hours. Risk Management will respond and assess and notify restoration companies on contract with the city.

2. Storm Drain or Drainage Way
i. Pump out or vacuum any ponded water present
ii. Remove debris
iii. Wash concrete and contain all wash water and remove iv. Remove contaminated soil and plants
v. High pressure clean affected storm drains and vacuum all water vi. Remove all containment and finish flushing and vacuuming area

3. Street, Curb or Gutter
i. Remove debris with Vactor
ii. Wash pavement, curb and gutter area , and vacuum all water with Vactor
iii. If Vactor decant pump is used, utilize decant apparatus to alleviate possibility of secondary spill and provide fall protection at open manhole.

6.2.8 Receiving Water Sampling (Industrial Waste Section) To comply with subsection D.7(v) of the SSS WDRs, the enrollee shall develop and implement an SSO Water Quality Monitoring Program to assess impacts from SSOs to surface waters in which 50,000 gallons or greater are spilled to surface waters. The SSO Water Quality Monitoring Program, shall, at a minimum:

I. Contain protocols for water quality monitoring
II. Account for spill travel time in the surface water and scenarios where monitoring may not be possible (e.g. safety, access restrictions)
III. Require water quality analyses for ammonia and bacterial indicators to be performed by an accredited or certified laboratory.

IV. Require instruments and devices used to implement the SSO Water Quality Monitoring Program to be properly maintained and calibrated, including any records to document maintenance and calibration to ensure their continued accuracy.

V. Within 48 hours of the enrollee becoming aware of the SSO, require water quality sampling for, at a minimum, the following constituents
a. Ammonia
b. Appropriate Bacterial indicator(s) per the applicable Basin Plan water quality objective or Regional Board direction which may include total and fecal coliform, enterococcus, and e- coli.
64 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

6.2.9 Notification Requirements (Superintendent/Supervisor) All overflows are required by law, to be promptly reported to regulatory agencies. The Legal Responsible Official (s) or their designee will make all notifications to regulatory agencies regarding reportable SSOs. All SSOs are tracked in the City of Roseville’s CMMS.

A. Prompt notification to regulatory agencies will be achieved by using the SSO Notification Guide (Tab 4)
B. All information regarding the spill will be documented on the SSO Field Report Form
C. Documentation and Data Tracking

1. All SSOs are tracked with a service request module in the City of Roseville’s CMMS. Completed service requests, work order requests and any overtime tags are turned into Superintendent/Supervisor for QA/QC. These are all resolved in the CMMS. Service requests for after-hours call will be generated the following business day.

2. Follow up PM work orders are generated to CCTV inspect affected lines and recommendations from CCTV crew are reviewed by Superintendent or Supervisor. Further recommendations regarding repair, replacement, or preventative maintenance schedule adjustment are made on the System Failure Analysis Form.

3. Field report forms are turned into Supervisor or Superintendent, who enters data into the CIWQS website. A minimum of 5 pictures is required for every SSO
D. Ensure that all appropriate documentation has been completed in the CMMS.

1. Private commercial spills, crew will provide a work order request to Supervisor documenting hours worked, equipment used and actions taken for billing purposes.

2. Private residential spills, crew will provide a work order request to Supervisor documenting hours worked, equipment used and actions taken.

6.3 Staff and Contractor Training
To train WWC Employees on the importance of the SSOERP, Supervisors created a Powerpoint Presentation as a training resource. The interactive presentation covers the written SSOERP in a classroom setting. This setting allows employees to clarify any elements within the procedure. The annual training is followed by a competency test and classroom spill simulation. In addition, WWC employees built a spill simulator in the training yard at the DCWWTP to test employees’ skills in estimating spills. If desired, supervisors can create spills from either a manhole, cleanout, or both. The water is metered and creates an accurate simulation within the confines of the WWTP.

Contractors are provided with the City’s wastewater collection system policies and procedures.

Per the contract, they are required to train all their employees on the City’s wastewater collection system policies and procedures before performing work on the City’s wastewater collection and conveyance system.
65 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

6.4 Spill Mitigation and Containment
The WWC Division has written the attached SOP for spill mitigation and containment. The plan is described throughout the SSOERP and in the Table 6-1 flowchart. Whenever a Sanitary Sewer Overflow (SSO) occurs, the highest priority is to contain the overflow and minimize the exposure to the public or the environment. This procedure will address the specific processes available to contain an SSO. Containment of an SSO becomes more difficult once the overflow reaches storm drain systems or a waterway. The quicker the source and the extent of the overflow can be identified, contained, or controlled, reduces the SSO's impact exponentially. Following the Sewer System Management Plan (SSMP) goals, quick response and containment will protect public health and safety while minimizing the environment's negative impacts.

The assessed hazards that may exist when responding to an SSO are:
• Traffic control
• Bloodborne pathogens
• Slips, trips, and falls
• Atmospheric conditions
• Pneumatic plugs
• Sprains and back injuries
Upon arrival to the location, survey the scene to determine the potential overflow location and source. There are times when called for a sewer overflow, and the source is potable water or storm drainage. Once determined, the water source is the sewer, mobilize the necessary wastewater collection personnel and equipment needed for assistance. Determine the category of the overflow, discharge points, and whether the SSO can reach Water of the State. Immediate notification to the Office of Emergency Services is required, should the overflow reach waters of the state. If the spill cannot be eliminated by controlling water flow from a residential or commercial building, more than likely, this spill is either a plugged main, structural deficiency, or an inoperable lift station.

The area impacted by the spill and the potential work area shall be secured to divert vehicle traffic and pedestrians away from the area by using any combination of signs, cones, delineators, barricades, arrow boards, or caution tape. Multiple techniques are identified to contain the spill depending on the circumstances, spill category, and material available. In no order, the list below is possible containment options.

Containment
Situation Options for Containment
Curb and
Gutter
• Create berm with rubber berm, dry sweep, dirt, or
sandbags; Utilize natural low spots or grade deviations • Use hydro-vac to control overflow
66 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Lift Station
Failure
• Use hydro-vac to contain
• Backup generator
• Bypass pumping
Open Space
• Dig a trench for containment
• Sandbag berm
• Dirt berm
Creek • Plug all affected storm drain inlets
Storm Drain
System (Dry)
• Plug all affected storm drain inlets; plug outfall if necessary
• Contain using the hydro-vac
• Request additional hydro-vac support if necessary
Storm Drain
System
(Storm Event)
• Plug all affected storm drain inlets
• Emergency bypass pumping
• Turn off stormwater pump station if applicable
Building
 Evacuate residents if needed
 Pop cleanout cap off; If no city cleanout, attempt to locate  Pop private cleanout if available
 Contain outside if overflow is relieved by
locating/removing cleanout cap
Containment with Hydro-Vac
Determine a location downstream of the spill appearance point where the hydro-vac unit can be set up and capture all water, including wash down water. Ensure no storm drain inlets are between the containment point you choose and the overflow point. Continue vacuuming overflow until the blockage has been cleared. Once cleared, wash remaining spill water to the vac tube to be vacuumed up.

Containment Using Berms and Mats
Utilize dirt, rubber berm, dry sweep, or other obstructing material to block drain inlets and pond the spill to a low natural area to contain and minimize the spill's effects. If possible, divert the spill to a downstream manhole that is not affected by the blockage.

Attempt containment by covering the affected storm drain inlet with rubber mats. Secure the mat in place with sandbags, dirt, or other heavy objects to keep in place.

Containment Using Pneumatic Plugs
Plugging the affected drain inlet or multiple drain inlets with a pneumatic plug can be effective. A pneumatic plug in the storm drain outfall would prevent the overflow from reaching the waterway. However, depending on the location within the City, drain inlets will vary in size, so utilizing plugs may not be the best option.
67 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSOERP- Appendix A- SSO Start Time Policy
Upon receiving call, note exact time that call received from answering service or administrative staff. This time will be used as a base for when the SSO started. Notify resident or business to stop using all water if possible.

A. Upon arrival, note if spill location point is or is not actively spilling. If not spilling from spill location point, but there is clear evidence of spill that requires a Vactor for cleanup effort, then document occurrence as a spill.

B. Initiate SSOERP to ensure that the SSO is contained, and the cause is corrected.

C. Photograph all affected areas, during the SSO, demonstrating containment and after cleanup. Use something in picture to gauge size of area features (i.e. tape measure, 5 gal bucket, etc) Email pictures to the Superintendent after completing necessary paperwork.

D. Provide detailed description of the SSO event, including exact times of arrival, SSO stop time, containment procedures, and names of collection personnel assisting you in the overflow.

E. The following questions should be asked of the resident or the individual reporting the potential SSO:

1. Did you notice water coming from the cleanout at the property line or manhole in the street? If so, what was the approximate time?

2. Were your drains running slowly at any time prior to you calling? If so, what was the approximate time?

3. If there were neighbors outside, close to the area of the SSO, did they notice water spilling? If so, what was the approximate time?

4. Be prepared to provide a brief summary of how you determined the start time, describing the steps you took while coming to your decision.

F. If the above questions do not produce an accurate account for the SSO start time, use the time the call was received by either the office personnel or the after-hours answering service, and subtract 15 minutes. Record this time as actual start time on the SSO Field Report Form.

G. If the evidence of the spill travels a farther distance than the logic of the 15 minutes, the field crew/responders shall try to recreate the spill the following day, using clean water.

H. In the event of an SSO from a sewer lift station, the start time will be determined using information gathered from the SCADA system.

I. SSO Stop time will be determined by either:

1. The arrival time of the service worker if the overflow had stopped prior to their arrival.

2. Clearing the blockage.

3. Interview of resident or witnesses
68 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSOERP Appendix B- Flooded Structure Pro cedures
In the event a failure in the City’s wastewater collection system causes a Sanitary Sewer Overflow in a resident’s home or business, instruct them to:

1. Keep people and pets away from the affected area(s), and do not track contamination throughout non-affected areas.

2. Don’t attempt to clean up the overflow. Instruct them the city has restoration companies available and will respond.

3. Turn off all central heat and air-conditioning systems and prevent flow from reaching any floor vents with towels or blankets.

4. Leave these items in the affected areas for restoration companies to cleanup.

Contact Risk Management at 774-5420 or 774-5202 during normal business hours. After hours, of if no answer, contact Dave Rawe, Risk Manager at 209-613-9448. They will assess and notify restoration companies on contract with the city to respond. If the resident refuses the offered clean-up services, ask them to sign the declination letter, refusing the service.

If the resident chooses to file a claim for damages, instruct them they must fill out a Government Claim Form.

A claim form can be obtained in the following ways:
• In person at the Roseville Civic Center, City Clerks Department and Risk Management Division, 311 Vernon St., Roseville, CA .
• By mail, by contacting the Risk Management Division at (916) 774-5202 or emailing the request to [email protected] • Electronically by following this link:
http://www.roseville.ca.us/hr/risk_management/how_to_file_a_claim.asp • Completed forms must be returned by mail or in person to the City Clerk's office at the Roseville Civic Center.
69 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSOERP Appendix C- Water Quality Sampling
This water quality sampling procedure describes the process and the sampling methodology to be used in the event of a sanitary sewer overflow exceeding 50,000 gallons. The water quality sampling results will enable the division to prioritize areas of concern regarding water quality impacts. Surface water samples will be collected using a grab sample technique. Employees are required to wear new sterile powder free surgical gloves when collecting all samples.

Trigger for Sampling -Water quality sampling is required within 48 hours of initial SSO notification for Category 1 SSOs in which 50,000 gallons or greater are spilled to surface waters.

Safety and Access- Water quality sampling should only be performed if it is safe to do so, and access is not restricted or unsafe. Unsafe conditions include traffic, heavy rains, slippery or steep creek banks, visibility issues, high flowing creeks and limited access due to soil conditions or poor terrain.

Where to Sample1. Source of SSO - Determine the entry point (source) of the SSO into the creek, and move downstream approximately 10 feet downstream.

2. Upstream Sample – Sample at a point 100 feet upstream from the source.

3. Downstream Sample – Sample at a point 100 feet downstream from the source. Determine the water velocity present in the creek or body of water during the SSO. Dropping debris in the creek, and timing how long the debris takes to travel a known distance is a good indicator of the water velocity present. Use this information to determine the next downstream sampling point. Multiply the water velocity by the spill duration to figure the furthest point downstream to sample.

Sampling Procedure1. Put on required PPE (safety glasses and latex gloves)

2. Collect Upstream Sample - Move approximately 100 feet upstream of the source.
a. Label the bottle accordingly and take a picture of the location you are sampling.
b. Sample away from the bank and avoid any debris or scum layer from the surface.
c. Fill the bottle against the direction of flow, replace the cap and secure the sample to avoid contamination.
70 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
d. Use a thermometer to measure the temperature of the upstream sample location and record the results.

3. Collect Source Sample- Move approximately 10 feet downstream of the source location.
a. Label the bottle accordingly and take a picture of the location you are sampling.
b. Sample away from the bank and avoid any debris or scum layer from the surface.
c. Fill the bottle against the direction of flow, replace the cap and secure the sample to avoid contamination.
d. Use a thermometer to measure the temperature of the source sample location and record the results.

4. Collect Downstream Sample – Move approximately 100 feet downstream of the source.
a. Label this sample “Downstream 1” and take a picture of the location you are sampling.
b. Sample away from the bank and avoid any debris or scum layer from the surface.
c. Fill the bottle against the direction of flow, replace the cap and secure the sample to avoid contamination.
d. Use a thermometer to measure the temperature of the downstream sample 1, and record the results

5. Collect Downstream Final Sample - After using the velocity and distance to determine the furthest downstream sample point, move to that location. a. Label this sample “Downstream Final” and take a picture of the location you are sampling.
b. Sample away from the bank and avoid any debris or scum layer from the surface.
c. Fill the bottle against the direction of flow, replace the cap and secure the sample to avoid contamination.
d. Use a thermometer to measure the temperature of the sample, and record the results
Required Water Quality Analyses – As detailed in section C-5 of Monitoring and Reporting Program (MRP), Order WQ- 2013-0058, a Technical Report shall be submitted in CIWQS online database with 45 calendar days. All samples will be immediately transported to the nearest certified water quality laboratory for analysis (DCWWTP or PGWWTP labs). The sample analysis, at a minimum will include the following:

1. Ammonia

2. pH

3. Electrical Conductivity
71 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

4. Bacterial indicators, such as total and fecal coliform enterococcus and e-coli, per the regional Basin Plan or as directed by SWRCB

5. Temperature
Equipment and Supplies – The following items and PPE are required for sampling:

1. Cooler with Blue Ice

2. Sterile sampling bottles

3. Powder free latex gloves

4. Safety glasses

5. Marking pen

6. Field log forms
72 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSOERP -Appendix D- Sewer Call For Service
When dispatched to a home experiencing sewer problem, the following procedures should be adhered to provide the resident with the best possible customer service and quickly correct the problem causing the SSO.

Residential

1. Contact the homeowner or resident upon arrival. Explain the process you will use to determine the problem. Resident should have already been instructed to stop all water use, so if water is still spilling from cleanout, check the nearest upstream manhole on the mainline for a blockage.

2. If no cleanout is visible, look in CMMS for cleanout location, look for an “S” marked in the curb, or other information that might indicate a cleanout.

3. If a city cleanout is found, clear the lateral blockage using the eel and a root cutting head, do not use a hand tape. CCTV to ensure line is clear, and all blockages have been removed. Record all time and pertinent information you have found on a work order, service request, or for after-hours calls, your overtime tag.

4. If no cleanout is found, locate the closest downstream manhole, and call for Vactor assistance, and run the main.

5. If the residence does not have a city cleanout, and the above procedures did not alleviate the blockage, we will use our equipment to run a “Viable” cleanout that belongs to the resident. This “viable” cleanout should be a factory fitting 4” cleanout, either a wye or combo wye, that we can easily get our equipment into and service the line. Once the line has been cleared, we will CCTV through this same cleanout, and determine where the blockage was located.

6. If the blockage was located below the location a city cleanout should be installed, we will schedule a cleanout installation during normal business hours.

7. If the blockage is located within the customer’s service line, notify them that the problem is in their portion of the lateral, the location and severity of the problem.

Advise the resident of the City’s policy for cleanout installation, and let them know this is a one-time service, and the city will not clear future blockages from the homeowner’s cleanout.

Document all information in the CMMS under activity code- SPHCC, (Sewer Plug Homeowner City Cleared) on a service request.

Private Commercial
When dispatched to a commercial property experiencing an SSO, start containment of the spill immediately. Notify the manager to stop using water and to call a plumber. Make sure the manager understands City staff will be containing the spill until their plumber responds, and they will be billed for staff and equipment. If after 60 minutes, the plumber doesn’t show, notify Placer County Health Department. Notify your supervisor that the health department has been called and to discuss possibly clearing the main or service.
73 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSOERP Appendix E- Sewer Lift Station Failure Response
The purpose of this procedure is to define strategies necessary to prevent an SSO from a lift station, in the event of a power or component failure within a lift station. The City of Roseville operates and maintains 17 neighborhood lift stations. Each station is equipped with SCADA, monitored 24 hours per day by wastewater treatment plant personnel. Each station has the maximum allowable downtime posted inside the door of each control panel. This identifies the retention time and the storage capacity in the collection system assets, before an SSO will occur. The lowest identified manhole is also identified to assist on call personnel in determining the remaining downtime. In the event of a lift station failure, the plant operator will notify the answering service that an alarm has been activated at a station, and the on-call service worker will respond and assess the alarm.

If no power is present in the panel, the service worker will:

1. Contact Roseville Electric at 774-5620, to verify they are aware of the outage.

2. Determine the level, and remaining downtime left in the station.

3. If downtime will be more than the maximum allowable retention, the on call service worker will call collection system personnel off the standby list, to get a Vactor in route. The Vactor will decant water at an identified point in the system, which won’t affect the left station levels. If it appears that one Vactor won’t keep up with flows, the on call service worker will call in additional personnel with Vactor to maintain levels in the station.

4. If outage appears to be a lengthy process, contact supervisor. Portable generator may be needed. In this event, an electrician will be needed.

5. Once flows are maintained, contact Supervisor to make them aware of the situation.

If Power is present in station, but pumps are not operating, the service worker will:

1. Attempt to operate the pumps in “hand” mode to eliminate the possibility of an SSO

2. If the pump operates in “hand”, continue operating and monitor the levels in the wet well. Contact the On Call Electrician @916-532-0612 and continue to monitor.

3. If station will not operate in hand mode, call additional personnel in with Vactor to monitor wetwell levels. Vacuum and decant accordingly, until the problem is rectified.

4. If it appears that one Vactor won’t keep up with the amount of flow into the wet well, the service worker will call in a second Vactor to maintain the levels in the station.

5. Standby and assist on call electrician, until the station is operational. 74 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSOERP Appendix F- SSO Chain of Communication
75 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
76 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 7
7 FOG Control Program
D.13 (vii) Each enrollee shall evaluate its service area to determine whether a FOG control program is needed. If FOG is found to be a problem, the enrollee must prepare and implement a FOG source control program to reduce the amount of FOG discharged into the sanitary sewer system. The plan shall include (a) public education outreach that promotes disposal of FOG, (b) a plan for disposal of FOG generated within the sanitary sewer system, (c) the legal authority to prohibit discharges to the system and measures to prevent SSOs and blockages from FOG, (d) requirements to install GRD, design standards, maintenance and BMP requirements, and records and reporting requirements, (e) authority to inspect grease producing facilities, enforcement authorities and sufficient staff to inspect and enforce FOG ordinance,(f) identification of sewer sections subject to FOG blockages and pm schedules for each section,(g) develop and implement source control measures for all sources of FOG for each section identified in (f) above.

This chapter describes the City of Roseville's Fats Oils and Grease program, developed as Roseville Municipal Code Section 14.14, in 2008. The ordinance's purpose is to provide the maximum beneficial use of the City's sewer services and facilities while preventing blockages of caused by discharges of FOG into the sewer, specifically from food service establishments (FSEs).

The City relies on two major components to control or eliminate the amount of FOG entering the wastewater system, 1) cleaning and inspection of the collection system on a prescribed maintenance schedule and 2) inspection, enforcement, and education for FSEs. FOG ordinance can be found at: http://qcode.us/codes/roseville/view.php?topic=14-14_14&frames=on

7.1 Public Education Outreach
WWC and Industrial Waste Division personnel developed public outreach materials and handouts that are distributed to all food service facilities managers during the facility inspection. In addition, all FSEs are required by RMC Section 14.14 to apply for a FOG Discharge Permit. The permit application includes references to RMC 14.14, which provides Frequently Asked Questions, Maintenance and Pumping Requirements, and Best Management Practices (BMPs) for the managers to follow. Finally, the City’s website below offers links for available public outreach:
https://roseville.ca.us/government/departments/environmental_utilities/at_your_service/sewer/se wer_business_customers

7.2 FOG Disposal Plan
Food Service Establishments and FOG generators are responsible for hiring private service providers to pump and haul FOG from their grease removal device at scheduled intervals. The requirement of the permittee is to keep all records, manifests, receipts and invoices for the cleaning 77 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
and maintenance of the device, which includes final disposal location. These records shall be provided to any City of Roseville inspector or enforcement officer upon request. Although City does not endorse or recommend services provided by any one service provider, the City will provide a list of service providers that are commonly used by businesses in the area.

7.3 Legal Authority
The WWC Division of Environmental Utilities manages the FOG control program, issuance of permits and performs inspection of all FSEs within its service area. In addition, RMC Chapter 14.14 includes all legal authority necessary to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by FOG. All FSEs are required to provide wastewater that is acceptable to the city, before discharging to the public sewer. A summary of the legal authority is included in Table 7-1.

Table 7-1 FOG Legal Authority
RMC Chapter Number RMC Chapter Title

14.14.010 (A) General Provisions- Purpose

14.14.030 FOG-Waste Discharge Permit Required

14.14.040 FOG-Discharge Limitation

14.14.050 Public Sewer Overflow; Nuisance abatement

14.14.070(F) Prohibitions

14.14.190 FOG Discharge Permit Conditions

14.14.320 Harmful Discharge

14.14.360 Violation-Penalty

7.4 GRD, Design Standards, BMPs, Recordkeeping and Reporting

7.4.1 Requirement to Install GRD
Every FSE at the time of construction, remodel or change in operation is required to install and maintain an approved and adequately sized grease removal device. In addition, at the EU Directors' discretion, may require an FSE that has caused or contributed to a greaserelated blockage, install a grease removal device. Depending on the type of facility, certain FSEs may require a grease interceptor, grease trap(s), or may not require a grease removal device (GRD). If during the plan review process, an FSE enrollee does not believe that their operation needs the designated GRD, they can request a variance from the ordinance. The final determination of the variance request is at the sole discretion of the EU Director. 78 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

7.4.2 Design Standards
The City Design Standard section 9-10. (G) indicates grease removal device sizing and installation shall conform to the current edition of the California Uniform Plumbing Code.

Grease interceptors shall be constructed following the design approved by the director and shall have a minimum of two compartments with fittings designed for grease retention. A 24” access manhole shall be installed over each interceptor chamber. The frame and cover shall be watertight and set to finish grade, making inspection, sampling, and grease removal activities available. In addition, the grease interceptor shall be installed at a location where it shall always be easily accessible for inspection, cleaning, and removal of accumulated grease. The minimum size of a grease interceptor for a new FSE is 1,000 gallons.

7.4.3 Best Management Practices
Every FSE shall implement BMPs in its operations to minimize the discharge of FOG to the grease control device and/or the public sewer. Detailed requirements for BMPs shall be specified in the FOG WDP and all FSEs are required, at a minimum, to comply with the permit BMPs as well as any additional BMPs established by the director. BMPs may include, but are not limited to, kitchen practices and employee training procedures that are essential in minimizing FOG discharge to the public sewer. Additional BMP practices are available on the City’s website.
https://roseville.ca.us/government/departments/environmental_utilities/at_your_service/se wer/sewer_business_customers

7.4.4 Records and Reporting Requirements
The permittee shall be required to keep all manifests, receipts, and invoices of all cleaning, maintenance, grease removal of/from the grease control device, disposal carrier, and disposal site location for no less than three years. In addition, the permittee shall, upon request, make the manifests, receipts, and invoices available to the director, any inspector, or an enforcement officer. These records may include an on-site logbook of grease interceptor, grease trap or grease control device cleaning and maintenance practices, a description of BMPs being implemented, including employee training, and copies of records and manifest of waste hauling interceptor contents.

7.5 Authority to Inspect
RMC section 14.14.290 grants the Director, an inspector, or an enforcement officer access to all parts of a wastewater generating and disposal facilities for purposes of inspection and sampling during all times the FSE is open and operating. No person shall interfere, resist or refuse entrance to the Director, an inspector, or enforcement officer attempting to inspect the facility. Any violation of this chapter, or the orders, rules, regulations, and permits issued under this chapter, is unlawful and shall be an infraction or misdemeanor as determined by the city attorney 79 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

7.6 Hot Spot Identification and PM Schedule
The WWC Division’s CMMS maintains all records for maintenance, inspection, and construction work orders for the collection system. Sewer mains subject to blockages from FOG or mains that require higher cleaning frequency are added to the division’s Hot Spot List. These mainline segments tend to have more frequent backups due to sluggish flows, poor grades, and sags, which allow solids to settle and FOG to form. The hot spot list has been compiled based on historical data, field crew observations, and CCTV condition assessments. These mainlines are also identified in a GIS layer in the Roseville GeoViewer, so field crews can access them while performing maintenance in the field. The frequency of Hot Spot cleaning ranges from 1-6 months, depending on history and CCTV inspection data. The WWC division strives to reduce and eliminate these hot spot areas during CIP projects or rehabilitation projects performed by City crews. Mainline segments get added to the Hot Spot list based on conditions noted during CCTV inspection and the current frequency of cleaning. Currently, the WWC division has scheduled maintenance projects with 276 mainline segments identified as Hot Spots.

7.7 FOG Source Control Measures
One of the more significant additions to the WWC FOG program was the requirement of a FOG Waste Discharge Permit (WDP). Ordinances in the RMC require that before discharging any wastewater from an FSE into the wastewater system, the enrollee must obtain a WDP. The WWC division performs facility inspections before the FSE can discharge. The terms and condition of the WDP are as follows.
 Grease interceptors/traps are required for food handling facilities unless the Environmental Utilities Director has issued a waiver or variance (RMC 14.14.130).  An FSE with a waiver or variance that has caused or contributed to a grease-related Sanitary Sewer Overflow (SSO) will be required to install a grease removal device. In the event it is not practical or feasible to install a grease removal device, the FSE will be subjected to an Annual Grease Mitigation Fee
 Grease removal devices shall be designed, constructed, and installed following California Plumbing Code Title 24, Part 5 and the City of Roseville Design and Construction Standards.
 Grease removal devices shall be maintained by pumping the entire contents when grease and sludge have exceeded 25% of the capacity of the interceptor, including removal of entire contents each time the interceptor is pumped. The interceptor shall be pumped out at a minimum of 6-month intervals or more frequently, depending on grease load from FSE.

The grease hauler shall be licensed with the California Department of Food and Agriculture.
 The permittee shall retain pumping and maintenance records for a minimum of 3 years.

These records shall be submitted quarterly to the City of Roseville and shall be readily available to City personnel inspecting the facility. At a minimum, the following information is required for the reporting records:
o Date of Service
o Volume removed
80 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
o Grease Hauler Permit number
o FOG disposal destination records
Repeated failure to submit reports on time could result in revocation of the FOG discharge permit.
 The permittee shall implement Best Management Practices (BMPs) in its operation to minimize the discharge of FOG to the sewer system under RMC 14.14.060  The permittee shall notify the City of Roseville Wastewater Collection Division at 916-746- 1890 of any of the following:
o Sale, lease, or transfer of the operation for which the permit was issued. o Change of facility name
o Changes to grease removal device or remodels, additions, or alterations to FSE greater than $20,000
o Any SSO or blockage that would contribute to an SSO

7.7.1 FOG Characterization Data Form
The WWC Division identified all the commercial and industrial FOG dischargers within their jurisdictional boundaries during the SSMP preparedness review/audit and listed them in the data collection form. The breakdown of FSEs is summarized in Table 7-1.

Table 7-1 FOG Characterization Data
Group Description Total
Bakeries Bakery – Bread/Other 17
Catering Catering 1
Grocery Grocery 21
Hotels Hotels 8
Meat Market Meat Market 1
Restaurants Eating – Fast Food 136
Eating – Sit Down Dining 122
Restaurants Total 258
Elder Care Facilities 12
Schools 27
Hospitals 3
Churches 2
Bars 13
Café 33
Deli 38
Ice Cream 15
Juice Bars 7
Movie Theaters 3
Grand Total 465
81 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
82 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 8
8 System Evaluation and Capacity Assurance Plan
D.13 (viii). The enrollee shall prepare and implement a capital improvement plan (CIP) that provides hydraulic capacity of key sanitary sewer system elements for dry weather peak flows, as well as the appropriate design for storm or wet weather events. The plan must include (a) evaluation of those portions of the sewer system that are experiencing or contributing to SSO discharge caused by hydraulic deficiency, (b) establish appropriate design criteria to undertake the evaluation, (c) The steps needed to establish a short‐ and long‐term CIP to address identified hydraulic deficiencies, including prioritization, alternatives analysis, and schedules. The CIP may include increases in pipe size, inflow, and infiltration (I/I) reduction programs, increases and redundancy in pumping capacity, and storage facilities. The CIP shall include an implementation schedule and funding source, (d) The Enrollee shall develop a schedule of completion dates for all portions of the capital improvement program developed in (a) ‐ (c) above. This schedule shall be reviewed and updated consistent with the SSMP review and update requirements as described in Section D. 14.

8.1 Capacity Evaluation Process
Two hydraulic models were developed and used by the WWC Division (Roseville Model Project and South Placer Wastewater Authority (SPWA) Wastewater Systems Evaluation Project) to identify peak flows in each collection system component (pipe and pump station). In 2007, a hydraulic model of the City’s sewer collection system was developed using the H2OMap Sewer modeling platform (2007 Model Development Project), parallel with a trunk sewer model for the combined Roseville, SPMUD, and Placer County systems. However, the City’s sewer model was updated in 2017 to reflect existing and future demands within the City and upgrade the modeling platform to the fully dynamic InfoWorks ICM software. In addition, for the current Systems Evaluation Update, the City’s model was updated in December 2020 to reflect existing, and future projected flows from Placer County and SPMUD. The report is located at:
https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_7964838/File/Government/Department s/Environmental Utilities/SPWA/Systems Evaluation Report Dec2020 Final_web.pdf While EU Engineering staff will periodically run the hydraulic model for development, the Principal Engineer and Process Engineer will review and update the system evaluation and capacity assurance plan every ten years, looking for deficiencies and opportunities for improvement.

8.2 Design Criteria
The WWC Division established 10-year 24-hour peak wet weather storm design criteria for the evaluation of existing collection system components and sizing of new collection system in the Roseville Model Project and the SPWA Wastewater Systems Evaluation Project. This included the development of wastewater flow generation factors based on water use records and flow monitoring data in the City of Roseville.
83 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

8.3 Capacity Enhancement Measures
The SPWA Wastewater Systems Evaluation included the identification of short and long-term Capital Improvement Projects (CIP) to meet current and future build-out flow projections for trunk sewers larger than 15 inches. Several deficiencies were identified in non-regional facilities which resulted in model-predicted overflows for one or more of the scenarios. Within the regional system, seven areas have been identified that either have deficiencies or could be impacted when upstream deficiencies are relieved.

Proposed improvement projects have been developed, and verified using the hydraulic model, to alleviate surcharging. The projects are summarized in Table 8-1. Each proposed project was reviewed on aerial mapping to identify potential design and constructability issues. These improvement projects were developed to sequentially decrease surcharging in downstream sewers.

Table 8-1 Proposed Capacity Improvement Projects
Project Location Existing Sizes Improved Sizes Description Estimated
Capital
Improvement
Cost
1 PS 26 .043 mgd firm
capacity 1.6 mgd PWWF at Buildout
Increased capacity of
PS26 and sewers on
Sierra College Blvd.
directly downstream
of PS26 to relieve Old
Auburn Trunk Sewer
$1,606,000
Sierra College
Blvd (Area G)
500 ft of 8-inch
1,900 ft of 10-inch
500 ft of 10-inch (upsize from 8-
inch)
900 ft of 12-inch (upsize from 10-
inch)
1,000ft of 15-inch (upsize from 10-
inch)
2 Eureka Rd
and E. Rsvl.

Pkwy
800 ft of 8-inch
1,400 ft of 10-inch
2,200 ft of 15-inch (upsize from 8 or
10-inch)
1,200 ft of new 15-inch
Redirect flows from
PS 26 and Sierra
College Blvd. down
Eureka Rd to relieve
Area E
$1,831,000
3 PS 25
(pumps)

2.02 mgd firm
capacity 2.6 mgd PWWF at Buildout
Increased Firm
capacity of PS 25 to
meet Buildout PWWF
New weir structure or
adjustments to
existing structure at
PS25
$758,000
PS 25
diversion
structure
N/A New diversion structure and
related piping
84 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

8.4 Capital Improvement Plan Schedule
The WWC Division Condition Assessment CIP divided the collection system manholes and pipes into 24 groups. The first group of pipes and manholes was inspected starting in 2006 and was included in the Rehabilitation and Replacement plan developed shortly after. The city continuously inspects pipelines using NASSCO’s PACP coding standard to develop a list of assets that need rehabilitation. When defects are identified, the city evaluates the risk of failure and assigns a priority ranking to each asset. Prioritizing those assets relies on several factors, including:
 Severity and extent of the defects (PACP Score).
 Maintenance records and SSO occurrences
 Hydraulic capacity needs and projection.
 The estimated remaining useful life of the infrastructure The goal of the CIP is to develop annual project bundles of approximately $1.5 million. Using the priority rank of the pipe segment, the CIP prioritization includes one additional factor, street repairs. To minimize disruption to newly paved streets, those streets that the City anticipates repairing in the upcoming fiscal year are highest priority.

Condition assessments will be continually performed, and the CIP will be adjusted after each evaluation as follows:
• Emergency repairs will be done immediately and not be included in the CIP. • Priority will be given to those assets which lie in the street to be paved such that the repair is done before street repaving
• Pipe segments will continue to be rated on the 1 to 5 scale, with 5 being the highest priority and 1s being the lowest. So, a 5 from the previous year's assessment would be prioritized over a 4 from the current assessment.

8.5 Appendix 8 – System Evaluation and Capacity Assurance Documents
Appendix 8 includes the following documents:
8-1 SPWA Regional Wastewater Systems Evaluation Report
85 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
86 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 9
9 Monitoring, Measurement and Program Modification
D.13. (ix) The Enrollee shall (a) Maintain relevant information that can be used to establish and prioritize appropriate SSMP activities, (b) Monitor the implementation and, where appropriate, measure the effectiveness of each element of the SSMP, (c) Assess the success of the preventative maintenance program, (d) Update program elements, as appropriate, based on monitoring or performance evaluations, (e) Identify and illustrate SSO trends, including frequency, location, and volume.

9.1 Metrics to Prioritize SSMP Activities
The WWC Division has developed Key Performance Indicators to assess their progress in maintenance, operations, and sanitary sewer collection system management. The entire KPI worksheet is attached as Appendix 9-1. The metrics were developed to identify successes and challenges in reducing SSO frequency and impacts, improving collection system reliability, and providing capacity in the system to convey peak flows. Establishing specific KPIs for each element allows the WWC Management team to determine the degree of success of each component.

Measurable performance indicators, e.g., number of SSO occurrences, length of lines cleaned, spill response times, number of capital projects completed, etc., are used. Additionally, the KPI benchmarking metrics worksheet includes the following categories of metric information:
• System Information
• Financial Information
• Sewer Maintenance
• Performance Measures
The City tracks detailed information about SSOs. While the number of SSOs has fluctuated up and down over the past four years, the average volume per SSO has decreased. This metric demonstrates the City’s proactive efforts to contain and control SSOs and mitigate them efficiently.

In addition, the City consistently shows a significantly lower SSO rate per 100 miles of pipe versus the State and Regional averages. These measurements indicate a successful sewer management program, employee training, emergency response, and a dedication to mitigating the effects of SSOs. Table 9-1 summarizes a few datapoints of the City's SSO data and benchmarking. Table 9-2 is a 10-year comparison of SSO rates for the City of Roseville, State of California and Region 5. 87 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
Table 9-1 Historical Summary of Sanitary Sewer Overflows *Net Volume = Volume Spilled minus Volume Recovered
** Through 20 FEB 22
Table 9-2, 10 Year SSO Comparison
0 10
20 30
40 50
60 70
80 90
100
2011/2012 2012/2013 2013/20104 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Comparison of SSOs/ 100 Miles
10 Year Span
Roseville SSO/100 Miles State SSOs/100 Miles Region 5 SSOs/100 Miles Year
Roseville
Total
SSOs
Roseville
SSOs
Rate/100
Miles
State
SSOs
Rate/100
Miles
Region
5 SSOs
Rate/100
Miles
Roseville
Total Spill
Volume,
Gallons
Roseville Net
Volume *
Spill/1000
Capita
State Net
Volume*
Spill/1000
Capita
Region 5
Net
Volume*
Spill/1000
Capita
2011/12 35 11.25 21.46 20.87 948 .03 1.89 4.53
2012/13 42 12.65 24.44 23.71 1105 .05 13.17 16.14
2013/14 47 13.34 53.55 90.77 1136 .37 12.26 12.46
2014/15 42 13.34 28.5 39.42 1205 .60 10.55 18.5
2015/16 39 12.62 23.49 34.8 2525 .28 2.61 25.54
2016/17 23 7.87 17.24 15.83 1081 .65 6.39 .43
2017/18 25 7.52 15.64 15.5 1531 1.11 3.57 1.73
2018/19 31 9.23 23.07 37.05 869 .05 3.67 1.88
2019/20 33 9.55 25.7 42.52 580 .4 2.88 .75
2020/21 50 16.07 13.39 18.7 825 1.97 .64 .64
2021/22** 17 5.13 38.06 67.93 1570 .49 .55 .25
88 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

9.2 Monitor and Measure Element Effectiveness
The WWC Division implements all elements of this SSMP and has been effective in minimizing SSOs and controlling the volume of those SSOs when they occur. The WWC Division evaluates the performance of its wastewater collection system at least annually using the developed KPIs. The City will then initiate changes to this SSMP and the related programs based on the results of the KPI evaluation. In addition, the Review of the SSMP and its elements is an assigned annual training for all WWC employees. A summary of the tracked KPIs and the relation to the SSMP elements are in Table 9-3.

Table 9-3 KPI Summarization
SSMP Element Purpose Performance Indicator
Goals Sets Priorities for Division Goals are listed in Chapter 1 of SSMP Organization Documentation of Chain of
Command
Continually update Chain of Command Org. chart
as changes occur
Legal Authority Ensures Ordinances Are Upheld
Protecting Integrity of the System Roseville Municipal Code Operations and
Maintenance
Reduce & Eliminate SSOs through
PM, CM and Emergency Response
 Manhole inspections performed
 Miles of sewer mains flushed per year
 Average cost of hydro cleaning
 Miles of sewer main and laterals CCTV per year
 Sewer cleanouts installed
 Sewer laterals rehabilitated
 Total miles rehabbed or replaced- mains and
laterals
Design and
Construction
Standards
Ensures Infrastructure Is Designed,
Installed and Tested Properly
 %Of new sewer main inspected vs. accepted
 % of new lateral inspected vs. accepted
Overflow Emergency
Response
Provide Swift Response, Minimize
Effects of an SSO, And to Meet
Regulatory Requirements
 Average response time to SSO
 Average SSO duration mains and laterals
Fats, Oils and Grease
Ensure Illicit Discharges of FOG
Aren’t Entering the Wastewater
System, Reduces FOG Blockages And
Overflows
 Public outreach events per year
 Gallons of FOG curbside pickup
 % of FSEs with grease removal device
 FSE FOG inspections per year
 Number of SSOs & volume spilled from hot
spots
System Evaluation &
Capacity Assurance
Evaluate and Ensure System Capacity
is Sufficient.

Hydraulic Model developed and run for new
development and special projects,
Monitoring,
Measurement &
Program Modifications
Evaluate The Effectiveness of The
SSMP and the Maintenance Activities
Necessary to be Compliant
 Total SSOs and volume spilled (mains and
laterals)
 % Of total volume recovered
 Total number of wet-weather SSOs
 Repeat SSOs within two years
 SSOs per 100 miles of pipe/year
 Number of Category 1 SSOs
89 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

9.3 SSMP Performance Monitoring and Update Process
The field crews and supervisors regularly communicate regarding issues found in the field.

Management uses this information to evaluate the success of the preventative maintenance program and the frequency it is performed. This strategy ensures field crews have buy-in. They continually check their effectiveness and identify potential areas for improvement in their performance. Their suggestions are essential for the City’s success and meeting the SSMP goals.

9.4 SSO Trends
The KPI Benchmarking worksheet includes sixty-three data points to track preventative maintenance activities, enabling management staff to develop SSO trends. Based on these trends, Supervisors will adjust the preventative maintenance programs to address trends that aren’t in alignment with the SSMP goals. The KPI worksheet is populated using data from completed work orders stored in the City’s CMMS, Maximo. Assigned personnel complete data entry on a semiannual basis minimum to keep the KPI sheet updated. Table 9-4 summarizes a few points of SSO benchmarking data for the last five years.

Table 9-4 SSO Statistics 2016-2021
Lower Lateral 155
Contractor Caused 1
CS Maintenance Caused Spill/Damage 2
Debris from Construction 3
Debris from Lower Lateral 2
Debris-Rags 10
Debris-Wipes/Non-Dispersables 12
Grease Deposition (FOG) 1
Non-Dispersables 2
Pipe Structural Problem/Failure 18
Pipe Structural Problem/Failure - Installation 3
Root Intrusion 101
Main 6
Damage by Others 1
Debris from Construction 1
Debris-Rags 1
Grease Deposition (FOG) 1
Pipe Structural Problem/Failure 2
Other Sewer System Structure 1
Other (Vactor Rear Door Seal Failure) 1
Grand Total 162
 % of SSOs caused by rags, roots, debris and
FOG
 # of Lift station failures
Program Audits Measures SSMP Effectiveness and
Necessary Changes
Audits are performed on schedule, by an
outside independent Engineering Firm
Communication Plan
Communication With the Public and
Satellite Agencies on SSMP
Performance
Regional partner meetings, City Website.
90 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

9.5 Appendix 9- Monitoring, Measurement & Modification
Appendix 9 includes the following documents:
9-1 KPI Benchmarking Metrics Sheet
9-2 SSO Historical Summary
91 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
92 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 10
10 Program Audit and Annual Report
D.13. (x) As part of the SSMP, the Enrollee shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. This audit shall focus on evaluating the effectiveness of the SSMP and the Enrollee’s compliance with the SSMP requirements identified in this subsection (D.13.), including identification of any deficiencies in the SSMP and steps to correct them.

10.1 Audit Process Summary
The City audits and updates its SSMP on a biennial basis. Updates may occur more frequently if the Superintendent discovers modifications or regulations changes between audits. The purpose of the audit is to evaluate the effectiveness of the SSMP, primarily through evaluating system metrics and performance measures. In addition, the audit evaluates the City’s compliance with the SSMP requirements, particularly the amended MRP requirements that were formalized in September 2013.

The City has invested in the resources of a local engineering firm to perform the biennial audit for the last three audit cycles. WaterWorks Engineers administers the audit much like an RWQCB audit would be. The process starts with gathering information utilizing the Water Boards PreInspection Questionnaire. This Audit Process has proven successful for the City, as significant changes have been made based on audit findings. The City will continue with this process for future audits.

10.2 SSMP Program Modifications
The WWC Division will monitor and review sewer performance metrics monthly and the status of each element of the SSMP on an annual basis. Formal SSMP audits will be performed every two years following the adoption of this SSMP. The SSMP is considered a “Living Document,” therefore the Wastewater Superintendent or Process Engineer (LROs) will initiate or direct corrective actions when SSMP deficiencies are identified between audits.

The primary responsibility for proposing and initiating modifications to the SSMP will be that of the WWC Supervisors or from input from WWC field crews. Review and approval of any amendment to the SSMP, including whether it is a major or minor change, will be the responsibility of the WWC Superintendent.
93 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

10.3 Appendix 10 - SSMP Audit Documents
Appendix 10 includes the following audit forms and reports for the previous five audits. 10-1 SSMP Internal Audit FY 10-11
10-2 SSMP Audit FY 11/12-FY 12/13
10-3 SSMP Audit FY 13/14-FY 14/15
10-4 SSMP Audit FY 15/16-FY 17/18
10-5 SSMP Audit FY 18/19-FY 20/21
94 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22

THIS PAGE LEFT INTENTIONALLY BLANK
95 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
SSMP ELEMENT 11
11 Communication Program
D.13. (xi) The Enrollee shall communicate on a regular basis with the public on the development, implementation, and performance of its SSMP. The communication system shall provide the public the opportunity to provide input to the Enrollee as the program is developed and implemented. The Enrollee shall also create a plan of communication with systems that are tributary and/or satellite to the Enrollee’s sanitary sewer system.

11.1 Purpose of the Communication Program
The purpose of the Communication Program is to describe how the City will inform, educate and engage with its stakeholders, regional partners, and the public on the development, implementation, and performance of the SSMP. Another aspect of this program is to increase public awareness of services provided by the City. Raising awareness of the significance of the sewer system and the impacts businesses and residents can make on the system is of utmost importance.

11.2 SSMP Development and Implementation
There were several opportunities for public comment during the development and implementation process at City Council meetings. In addition, the SSMP has been certified by the City Council on three occasions, 2009, 2014, and again in 2019. Since certification by the City Council, the division’s SSMP has been audited on five occasions. This effort on re-writing the SSMP in its entirety will be on the City Council agenda for approval. Once approved, the document is available for download and review on the City’s website at: https://www.roseville.ca.us/sewer

11.3 Public Outreach
The City’s website is the central hub of communication for the businesses and residents of Roseville. The division’s website offers many links to assist the public with any sewer issues, explain the importance of the City’s wastewater collection system and summarize all the provided services. The division’s motto is to “Call us First” with all sewer problems. Our emergency response service van is wrapped with the Call Us First motto. Since the City owns and maintains the lower lateral from the property line to the City main, calling us first to investigate a potential blockage may save residents from an unnecessary plumbing bill. Environmental Utilities in partnership with Roseville electric publishes a monthly print newsletter, Utility News, which goes out monthly to all customers who receive a printed bill. This newsletter includes information about all aspects of utilities and how customers can reduce impacts to infrastructure. Additionally, customers get an electronic version of similar stories sent to their emails, adding to the number of messaging opportunities the city provides. The WWC Division is expanding the use of the website 96 SEWER SYSTEM MANAGEMENT PLAN | Updated 20 FEB 22
and social media to deliver proactive and deliberate messaging on WDR/SSMP requirements and program status to residential, commercial, industrial, and public stakeholders.

11.3.1Live Sewer Smart
The City belongs to a multi-jurisdictional group named Live Sewer Smart. The Live Sewer Smart website contains information for residents of Roseville and the surrounding communities to educate and encourage proper ways to reduce impacts on the sewer system. For example, the website provides residents with timely information regarding wipes in the pipes, how to properly dispose of FOG, and contact information for all agencies belonging to the program, should they have questions. In addition, there are several links to videos presenting more details that affect residential and commercial sewer systems. Live Sewer Smart can be located at:
https://livesewersmart.com/

11.4Tributary/Satellite Communication
The WWC Division routinely communicates with their satellite partners and often supports them with mutual aid sharing in terms of equipment and resources. The City has three formal agreements with tributary and satellite systems in place and currently working on a mutual aide agreement with the County of Placer Wastewater Division. The listed agreements below are included as appendices in Chapter 3:
• The Joint Exercise of Powers Agreement for the SPWA – Appendix 3-2 • The agreement regarding the operation of and use of the South Placer Regional Wastewater Facilities – Appendix 3-3.
• The Contract and Operating Agreement with Sacramento Area Sewer District and Sacramento Regional County Sanitation District – Appendix 3-4 Notice of Exemption
To: Placer County Clerk From: City of Roseville
Recorder’s Office Development Services Dept.
2954 Richardson Drive 311 Vernon Street
Auburn, CA 95603 Roseville, CA 95678
Project Title: Sewer System Management Plan Recertification Project Location(s): City of Roseville, CA (Citywide)
Project Description: The California State Water Resources Control Board (SWRCB) issued a Statewide General Waste Discharge Requirement (WDR), Order No. 2006-0003-DWQ in May 2006.

Under the WDR, all public entities that own or operate sanitary sewer systems greater than one mile in length that collect or convey wastewater must prepare a certified SSMP. The intent of the SSMP is to facilitate proper funding, operation and management of the sanitary sewer system in order to reduce sanitary sewer overflows, their impacts to the State's water bodies, and to protect public health.

Provisions in the WDR require periodic audits. Recertification of the SSMP must occur every five years or if significant changes have been made to the SSMP. The Roseville City Council adopted and certified the original SSMP in 2007, and the last recertification occurred in October 2022.

On June 6, 2023, the SWRCB issued an updated WDR, Order No. 2022-0103-DWQ. This order replaced the old order and provided updated guidance and regulations related to owning and operating a sanitary sewer system designed to convey sewage. This updated guidance and regulation impacted the City’s SSMP. The City underwent a required periodic audit of the current SSMP by an outside consultant, which resulted in recommendations for changes that have been incorporated into the updated SSMP. The changes included terminology changes, changes to the City’s sewer emergency response plan, naming and classification of spills for reporting purposes, as well as other minor edits and clean up items.

Public Agency Approving Project: Roseville City Council Agency/Individual Carrying Out Project: City of Roseville Environmental Utilities Department Reason why this Project is Exempt: The recertification of the SSMP qualifies for a Class 8 Categorical Exemptions as described in Section 15308 of the California Environmental Quality Act (CEQA) guidelines which states:
“Class 8 consists of….actions taken by agencies to assure the maintenance, restoration, enhancement, or protection of the environment where the regulatory process involves procedures for protection of the environment.

The project involves the recertification of the SSMP based on a periodic audit of existing sewer facilities and updating the plan based on the new Statewide General WDR issued by SWRCB. No expansion of treatment capacity is proposed; and no environmental resources will be disturbed. Consequently, the Class 8 Categorical Exemption applies.

Lead Agency Contact Person: Tracie Mueller, Roseville Environmental Utilities Department (746-1812).

Signature: Date: 2/6/2025
Jessica Lynch, Environmental Coordinator
City of Roseville

COUNCIL COMMUNICATION
CC #: 3842
File #: 1002-04
Title: Solid Waste Recycling Site Lot 15 - Grant Deed
Contact: David Samuelson 916-746-1708 [email protected] Meeting Date: 4/16/2025
Item #: 7.14.

RECOMMENDATION TO COUNCIL
It is recommended that the City Council take the following action:

1. Adopt the attached resolution accepting the Grant Deed of Lot 15 for the purpose of a Solid Waste Recycling Site as shown on the Final Map of Sierra Vista - Federico Large Lot Subdivision, Subdivision No. PL 15-0192, recorded on February 16, 2018, in Book EE of Maps,