Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Equipment
131106 - 4
personnel shall be fully trained and capable of assuming Spray Ground maintenance tasks; training may begin prior to Owner taking occupancy.
3.04 CLEAN-UP
A. Upon completion of Spray Ground equipment, remove all debris, materials and equipment occasioned by this Work to the approval of the Architect/Owner.
END OF SECTION
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 1
SECTION 13 11 07
SPRAY GROUND MECHANICAL
PART 1 GENERAL
1.01 WORK INCLUDED
A. Spray Ground mechanical piping as indicated on the Drawings for circulation and filtration systems, chemical control systems, booster pump systems and appurtenances.
B. Domestic water system from points of connection within Spray Ground mechanical equipment room to make-up water system.
C. Filter backwash piping to point of connection with backwash receptor as required.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work for this Section shall have been successfully engaged with a C-53 license as an RME or RMO for at least the past four (4) years immediately prior to the commencement of the work. The Qualified contractor Shall submit documentation of a minimum of three (3) interactive spray ground play equipment and climb-on structure installations completed in the last four (4) years.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years’ experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years’ experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Standards:
1. All equipment supplied or work performed shall comply with regulations governing public Spray Ground areas.
2. Work shall be performed in accordance with the applicable editions of all National, State and local codes, laws, regulations and ordinances, including the following:
a. American National Standards Institute (ANSI).
b. American Society for Testing Materials (ASTM).
c. American Waterworks Association (AWWA).
d. American Welding Society (AWS).
3. Do not construe anything in the Drawings or Specifications to permit Work not conforming to these requirements.
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Provide submittals in conformance with the requirements of Section 13 11 00.
B. Required submittals include:
1. Pipe and Fittings as specified in Article 2.02 of this Section.
2. Valves as specified in Article 2.03 of this Section.
3. Pressure / Vacuum Gauges as specified in Article 2.04 of this Section.
4. Pipe Hangers and Supports as specified in Article 2.05 of this Section.
5. Sleeves and Waterstops as specified in Article 2.06 of this Section.
C. Submit proof of qualifications as specified in Article 1.02.A of this Section.
1.04 PRODUCT HANDLING
A. Delivery: Deliver all materials to the Project Site in the manufacturer’s original unopened containers with all labels intact and legible.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 2
B. Storage: Store all materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project site.
C. Protection: Use all means necessary to protect Spray Ground mechanical items before, during and after installation and to protect the installed Work specified in other Sections.
D. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect/Owner and at no additional cost to the Owner.
1.05 JOB CONDITIONS
A. Cooperate with entities performing Work specified in other Sections to so that no conflict of new construction or occupied space may occur. Should any installation Work be done without such craft coordination, that Work so installed shall be removed and re-installed.
PART 2 PRODUCTS
2.01 PRODUCT QUALITY
A. Materials and equipment shall be new, of the best quality for the purpose intended, and shall be clearly marked with the manufacturer's name and nameplate data or stamp and rating. As far as practicable, materials and equipment shall be of one manufacturer.
2.02 PIPE AND FITTINGS
A. PVC Schedule 40: Type 1, normal impact, NSF approved for solvent welding applications, ASTM Specification D-1785, color shall be white. Dura, Lasco, or equal.
B. PVC Schedule 80: Type 1, normal impact, NSF approved for solvent welding applications, ASTM Specification D-1785, color shall be gray. Dura, Lasco, or equal.
C. PVC SDR35: Conforming to ATSM D-1784, use with epoxy coated bell and spigot-type fittings or epoxy coated mechanical joint by flange adapters with epoxy coated cast iron fittings as specified in Article 2.02 (F), below. Johns-Manville "Big Blue", Diamond Plastics, or equal.
D. Copper Tubing: ASTM Specification B-88, hard drawn, with ANSI Standard B16.22 wrot copper fittings.
E. Steel: ASTM Specification A-120, Schedule 40 black or galvanized pipe with ASTM A-47 150 lb. banded malleable iron threaded fittings.
F. Cast Iron: ASTM Specification B16.1, cast iron flanged fittings, provide epoxy coating as required for use with chlorinated water.
G. CPVC Schedule 80: Type I normal impact, NSF approved for solvent welding applications, ASTM specification D-1785, color shall be 'Gray'.
2.03 VALVES
A. Ball Valves:
1. For pool system: True-Union design, PTFE seat material with FPM or FKM Double O-ring stem seals, locking handle, NSF certified. PVC schedule 80 body for below grade installation. CPVC Schedule 80 body for above grade installation. Furnish ball valves on all pip diameters 2 ½” or less with a rating of at least 200psi at 73° F, Asahi Pool-Pro, Nibco, or Georg Fischer.
2. For copper pipe system: 3-piece full-port bronze body valve with Teflon seat, ‘Apollo’, ‘Nibco’ or equal.
B. Butterfly Valves:
1. Epoxy coated cast or ductile iron body, 316 stainless steel disc and stem, viton seat material, furnish hand wheel/gear operators on all valves 8" and larger. DeZurick, Keystone, or Asahi Pool Pro, or Ipex.
2. PVC body, PVC disc and EPDM construction suitable for chlorinated water applications.
Stem shall be of 316 stainless steel and non-wetted. Valves shall be self-gasketed design For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 3
with a convex sealing arrangement. Valves 1-1/2” – 10” shall be rated to 150 psi and 12” valves shall be rated to 100 psi at 70°F. Asahi Pool-Pro, no known equal.
C. Check Valves: Wafer-type, epoxy coated cast or ductile iron body, 316 stainless steel plates and shaft, viton seat material. Centerline, Metraflex, or equal.
D. Existing RP Backflow Preventer: Shall be test and found in compliance prior to completion of job.
E. Make-up Water Control: Provide 1” ‘Cla-val’ fill system including ‘Cla-val’ solenoid control valve #136-01BY, 1” ductile iron epoxy coated body with cast iron disc retainer and diaphragm washer with bronze trim, flanged globe pattern, 120V at 60 HZ. Solenoid wiring shall be wired to water chemistry controller. Provide 2” air gap at fill point. One (1) system total.
2.04 PRESSURE / VACUUM GAUGES
A. Furnish and install pressure and vacuum gauges on the discharge and suction sides of all pumps. 2” or 2-1/2" dial, bottom connection, chrome ring and shut-off cock and snubber.
Ranges shall be selected to indicate between mid-point and two-thirds of maximum range under design conditions. Marsh, Trerice, or equal.
2.05 PIPE HANGERS AND SUPPORTS
A. General:
1. The requirements of this Section relates to various requirements of the Agreement, General and Supplementary Conditions, Specifications, Drawings, and modifying documents which are part of the Construction Contract. Responsibility for coordination of all such applicable requirements will be that of the Contractor.
B. Description:
1. This section provides guidelines and limitations for the support of all mechanical, electrical, plumbing or architectural items from the building structure, and for the seismic bracing of such items.
2. Design and install all support and bracing systems as required for the swimming pool systems. Provide for attachment to portions of the building structure capable of bearing the loads imposed. Design these systems to not overstress the building structure.
C. Quality Assurance:
1. Design and install all support systems to comply with the requirements of the 2022 California Building Code, Chapter 16A.
2. Seismic bracing is to be designed by a professional engineer licensed in the State of California.
3. For the seismic bracing of mechanical, electrical and plumbing system, refer to “Guidelines for Seismic Restraints of Mechanical Systems and Plumbing Piping Systems” by Sheet Metal and Air conditioning Contractors National Association, Inc., (SMACNA) for guidelines.
D. Submittals:
1. Submit shop drawings for all substructures and attachment methods.
2. Submit proposed alternative methods of attachment for review and approval by the Architect/Owner, prior to deviating from the requirements given below.
3. For all pipe hangers and support systems, submit structural calculations and details which include all resultant forces applied to the building structure and are prepared and signed by the Contractor’s licensed California professional engineer. Calculations will be reviewed for compliance with design criteria, not for arithmetic.
E. Materials:
1. Use Kin-Line, Grinnel, or approved equal.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 4
2. Support all pipelines individually with hangers, each branch having at least one hanger.
Lateral brace as noted and required.
3. Support piping near floor with steel stanchions welded to end plates secured to pipe and floor.
4. Support vertical piping at each floor level. Install coupling in piping at each support.
Coupling shall rest on and transmit load to support. Isolate copper from steel supports with vinyl electrician's tape around pipe and coupling.
5. Use Stoneman "Trisolator," Unistrut, or approved equal, isolators at each hanger and other support points on bare copper tubing system.
6. For PVC pipe, space hangers four (4) feet apart for pipe sizes 1" and under, five (5) feet apart for pipe sizes 1-1/4" to 2", and six (6) feet apart for pipe sizes over 2". Space hangers for horizontal pipes at a maximum of six (6) feet for copper 2" and smaller and for steel 1-1/4" and smaller; ten (10) feet for copper 2-1/2" and larger and for steel 1-1/2" and larger.
7. Size hanger rods, screws, bolts, nuts, etc., according to manufacturer's sizing charts.
8. Trapeze hangers may be used for parallel lines.
9. Use galvanized or stainless steel hangers, attachments, rods, nuts, bolts, and other accessories in pool mechanical room, high humidity areas, or where exposed to weather.
Hot dip galvanize all items which are not factory furnished. Plating for hinged movements must be done at the factory.
10. Lateral Bracing: To prevent swaying of the piping systems, provide angle iron bracing and anchor into wall or overhead framing. Piping shall be braced or anchored in such a way as to resist a horizontal force of 50% of its operating weight in any direction.
11. Do not use wire or other makeshift devices for hangers.
12. Furnish all substructures and fasteners required to comply with the limitations given below. Use material as specified in the various sections and as appropriate to their use.
F. Guidelines & Limitations:
1. Each Contractor will coordinate the load requirements from all subcontractors so that no combination of loads overstresses the building structure or exceed the limitations given below.
2. Concrete Structure:
a. Support all loads hung from concrete structure with cast-in-place inserts, unless drilled-in anchors are specifically approved in writing prior to placing the concrete. b. Concrete anchors must not penetrate into reinforcing bars. Where the anchors boring indicates the presence of reinforcing bar, patch hole with an epoxy type grout and relocate anchor 12 diameters away.
c. Individual expansion anchors cannot support any loads greater than 300 pounds or manufacturer’s specified load capacity without approval.
3. Steel Structure:
a. Hang no more than 20 pounds per metal deck rib in any span. b. At beams, hang all beam loads greater than 40 pounds concentric to beam, not off the flanges.
c. Attached no loads to the beams or girders greater than the following without specific approval from the architect;
i. Roof beams and girders: 300 pound point load or 600 pound total load for a single span.
G. Seismic Bracing:
1. Design and install seismic bracing to not ground out vibration and sound isolation systems.
2. All items of mechanical and electrical equipment 60” or more in height are to be seismically braced whether such bracing is shown or not.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 5
2.06 SLEEVES AND WATERSTOPS
A. Provide sleeves where work of this Section passes through fire rated partitions, floors and ceilings, concrete slabs or exterior of structure. Caulk clearance space using sealant appropriate for application in conformance with manufacturer's recommendations and Title 24 of California Code of Regulations. 3m, Dow Corning, or equal. In lieu of sleeves and caulking, "Link Seal" products may be used.
B. Provide prefabricated waterstops as indicated on the Drawings at all pipe penetrations through structures containing stored water (i.e., Spray Ground, balance tanks, etc.) to insure leak-proof seals.
PART 3 EXECUTION
3.01 SURFACE CONDITIONS
A. Inspection:
1. Prior to Work of this Section, carefully inspect the installed Work of other trades and verify that such work is complete to the point where this installation may properly commence.
2. Verify that items of this Section may be installed in accordance with the original design and referenced standards.
B. Discrepancies:
1. In the event of discrepancy, immediately notify the Architect/Owner.
2. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.
3. Failure to notify the Architect/Owner and give written notice of discrepancies shall constitute acceptance by the Contractor of existing conditions as fit and proper to receive his work.
3.02 ABBREVIATIONS AND SYMBOLS
A. Abbreviations and symbols on the Drawings are those most commonly used. Obtain clarification from the Architect/Owner on any questionable items before bid.
3.03 GENERAL PIPING REQUIREMENTS
A. Size any section of pipe for which size is not indicated or any intermediate section erroneously shown undersized the same size as the largest pipe connecting to it. Sizes listed are nominal.
B. Cut pipe accurately to job measurements and install without springing or forcing, true to line and grade, generally square with building and/or structures and adequately supported to prevent undue stress on pipe, fittings and accessories.
C. Make changes of direction with manufactured fittings. Street ells, bushings, reducing flanges, close nipples or bending of pipe is not allowed.
D. Use great care to install piping in accordance with best practice. Plastic pipe shall be “snaked” in trenches to allow for thermal expansion.
E. All above grade, below grade and buried or imbedded PVC shall be installed using solvent weld fittings. Also, each and every fitting and pipe end shall be prepared with solvent primer.
Fittings shall be joined individually and with enough time between assembly of adjacent joints to allow them to seal solidly. After joining, an even ring of primer must be visible around the entire fitting. If any fittings are installed without visible primer, the fitting shall be removed and discarded and piping recut, rechamfered, and joint made up again using a new fitting. All procedures, methods and techniques used to make up solvent weld joints shall be in strict accordance with manufacturer's recommendations.
F. Arrange pipe and hangers to allow for expansion, contraction and structural settlement. No pipe shall contact structure except penetrations as shown on the Drawings.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 6
G. Provide dielectric connections between copper and dissimilar metals. In copper systems, threaded piping including connections to equipment shall be brass pipe and fittings. Install dielectric connections in vertical sections of piping only.
H. Run pipe full size through shut-off valves, balancing valves, etc. Change pipe size within three (3) pipe diameters of final connection to control valves, fixtures and other equipment.
I. Provide unions or flanges at connections to equipment, on service side of valves and elsewhere as required to facilitate ease of maintenance.
J. Locate equipment shut-off valves as close to equipment as possible maintaining easy valve access.
K. Make all connections between domestic water systems and equipment or face piping with approved backflow prevention devices as required.
L. All PVC pipe exposed to direct sunlight shall be painted with two coats of Exterior Acrylic SemiGloss Paint, Sherwin Williams or equal. Color to be selected by the Architect. Prior to painting the PVC pipes, the exterior of all PVC pipes shall be wiped with Methyl Ethyl Ketone, or an approved equal, to remove the glaze from the pipes.
3.04 TRENCH EXCAVATION AND BACKFILL
A. Excavation:
1. Excavate and backfill trenches as required for the Work of this Section. Conform with all applicable codes.
2. The Contractor shall perform all excavation of every description and of whatever materials encountered, to the depths indicated on the Drawings or as necessary. The Contractor shall dispose of the excavated materials not required or suitable for backfill as directed and shall perform such grading as may be necessary to prevent surface water from flowing into the trenches. The Contractor shall provide adequate equipment for the removal of storm or subsurface waters which may accumulate in the excavated areas.
B. Trenching:
1. Excavate trenches to lines and grades as indicated on the Drawings and with banks as nearly vertical as practicable.
2. Bottoms of trenches shall be accurately graded to provide uniform bearing on undisturbed soil for the entire length of each section of pipe.
3. The width of the trench at and below the top of the pipe shall be such that the clear space between the barrel of the pipe and the trench wall shall not exceed 8” on either side of the pipe. The width of trench above the top of pipe may be wider if necessary.
4. Over-depth excavations shall be filled with tamped sand to required grades.
5. Excavations of five (5) feet or more in depth shall be shored or supported in conformance with rules, and regulations of State and Federal Governments. Shoring shall be constructed, maintained and removed in a manner to prevent caving of the excavation walls or other load on the pipe.
C. Backfilling:
1. Material for backfilling of pipes shall be approved granular material less than two (2) inches in diameter obtained from the excavation, sand or an approved import fill. No material of a perishable, spongy or otherwise unsuitable nature shall be used as backfill.
2. Backfilling of pipe trenches shall commence immediately after installation and testing to preclude damage to the installed pipe. Backfill around pipe shall be carefully placed so as not to displace or damage the pipe, and shall be carried up symmetrically on each side of the pipe to one foot above the top of the pipe. The material shall be carefully compacted or consolidated before additional backfill is placed.
3. Backfill above an elevation of one foot above the top of pipe in conformance with requirements of Section 13 11 01, “Spray Ground Excavation”. Material for balance of For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 7
backfill shall be approved granular material less than six (6) inches in diameter taken from the excavation.
4. Unless otherwise indicated on the Drawings, all pipe shall have a minimum of eighteen (18) inches of cover.
3.05 GENERAL EQUIPMENT REQUIREMENTS
A. Position equipment to result in good appearance and easy access to all components for maintenance and repairs.
B. Install piping, flues, breeching and ducts so that they do not interfere with equipment access.
C. Install level, secure and out of moisture. Provide shims, anchors, support straps, angles, grouted bases, or other items as required to accomplish proper installation.
D. All screws, nuts, bolts and washers shall be galvanized or stainless steel. After fabrication, hotdip galvanize unfinished ferrous items for outdoor, below grade or other use subject to moisture.
E. Extend 1/2” Schedule 40 black steel pipe lubrication tubes from all hard-to-reach locations to front of equipment or to access points. Terminate with proper type of lubrication fitting.
3.06 VALVES AND STRAINERS
A. If no shut-off is indicated, provide ball valves at inlet connections and balance valves at outlet connections to fixtures and equipment. Provide proper valve trim for service intended.
B. Use no solder end valves unless noted otherwise; provide adapters in copper tubing systems.
C. Locate valves with stems above horizontal plane of pipe. In general, locate valves within six (6) feet of floor, out from under equipment, in accessible locations with adequate clearance around hand wheels or levers for easy operation.
D. Provide all valves, cocks and strainers, full pipe size unless indicated otherwise.
E. Provide hand wheel operators on all valves 6” and larger, under 6” lever operators may be used.
F. Provide tool operated valve with stainless steel shaft extension and 'on deck' tool operation for surge chamber butterfly isolation valve.
3.07 IDENTIFICATION OF PIPING
A. Identify each valve by a numbered brass tag with hole and brass chain mounted on valve stem or handle. Tag to be a minimum of 1” in diameter and numbers at least 1/4” high stamped into tag. Valves and plumbing lines shall be labeled clearly with the source or destination descriptions.
B. Install an identification chart in a plastic or glass framed enclosure which schematically illustrates the proper operation of all piping systems and indicates number and location of all valves and control devices within the system.
C. All piping within the mechanical and chemical rooms shall be clearly labeled indicating flow direction, piping identification in coordination with 3.07 A.
3.08 TESTS
A. Perform tests in presence of Architect/Owner with no pressure loss or noticeable leaks.
B. Do not include valves and equipment in tests. Include connection to previously tested sections if systems are tested in sections.
C. Perform tests as follows:
System Test Pressure Test Medium Duration
Spray Ground Piping 50 psig Water* 4 hours
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Mechanical
131107 - 8
Pool Main Drains 30 psig Water* 4 hours
Domestic Water 150 psig Water* 4 hours
*Never test PVC pipe or fittings with air or other gases, always use water.
3.09 PIPE MATERIAL APPLICATION
A. PVC Schedule 40: Below grade Spray Ground piping and domestic water piping up to 12” line size; use standard solvent weld fittings.
B. PVC Schedule 80: Above grade Spray Ground piping up to 12” line size; use solvent weld Schedule 80 or epoxy coated cast iron fittings.
C. Type L Hard Copper: Above grade domestic water piping.
3.10 CUTTING AND DRILLING
A. Cutting or drilling necessary for installation of Work of this Section shall be done only with approval of the Architect/Owner.
3.11 CLOSING-IN OF UNINSPECTED WORK
A. Do not cover or enclose Work before testing and inspection. Re-open Work prematurely closed and restore all Work damaged.
3.12 QUIETNESS
A. Quietness is a requirement. Eliminate noise, other than that caused by specified equipment operating at optimum conditions, as directed by the Architect/Owner.
3.13 FLUSHING OF LINES
A. Flush or blow out pipes free from foreign substances before installing valves, stops or making final connections. Clean piping systems of dirt and dust prior to initial start-up.
B. Just prior to plastering the pool, under the observations of the IOR, the pool mechanical system shall be flushed using the pool circulation pump. Circulate water through the mechanical system until the effluent water from the pool return heads runs clean.
3.14 CLEAN-UP
A. After all Work has been tested and approved, the Spray Ground Contractor shall thoroughly clean all parts of the equipment installations, including all pool pipe and fittings in the pool mechanical room. Exposed parts shall be cleaned of cement, plaster and other materials and all grease and oil spots removed with solvent.
B. The Spray Ground Contractor shall remove debris from the Project site. Cartons, boxes, packing crates and excess materials not used, occasioned by this work shall be disposed of to the satisfaction of the Architect/Owner.
C. If the above requirements of clean-up are not performed to the satisfaction of the Architect/Owner, the Architect/Owner reserves the right to order the work done, the cost of which shall be borne by the Spray Ground Contractor.
END OF SECTION 131107
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 1
SECTION 13 11 08
SPRAY GROUND ELECTRICAL
PART 1 GENERAL
1.01 WORK INCLUDED
A. Provide labor, materials and equipment as required to install the Spray Ground electrical system including but not limited to:
1. A complete and operable system of service equipment, switchboards, panelboards, conduits, switches, time clocks and wiring for power and lighting, motor control centers.
2. Junction and/or pull boxes, conduits, disconnects, starters, contactors, wiring and connection of all motors and mechanical equipment, including connection and wiring of line voltage controls associated with the mechanical systems.
3. Complete grounding system as required and shown on the Drawings.
4. Complete equipotential bonding system as required and shown on the Drawings and in accordance with the National Electrical Code Article 680
5. Adjusting and preliminary operation of the completed electrical system as described in Article 3.06, A of this Section.
6. Cleaning of all completed Work and installation adjustment of all trim and decorative items.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work for this Section shall have been successfully engaged with a C-53 license as an RME or RMO for at least the past four (4) years immediately prior to the commencement of the work. The Qualified contractor Shall submit documentation of a minimum of three (3) interactive spray ground play equipment and climb-on structure installations completed in the last four (4) years.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Ordinances and Codes: Materials and construction shall conform with all applicable code requirements, including:
1. National Electrical Code, latest edition; Electrical Safety Orders of the State of California; Department of Industrial Relations; regulations of the State Fire Marshal; rules and regulations of the Board of Underwriters of the Pacific, UL 50, 50E and NEMA 250 rating.
2. Chapter 31 of California Building Code, 2022 edition.
C. Verification of Conditions:
1. The locations shown on the Drawings are diagrammatic only and the exact finish location of equipment and materials cannot be indicated. Therefore, locations of all Work and equipment shall be verified to avoid interferences, preserve head room and keep openings and passageways clear. Changes shall be made in locations of equipment and materials which may be necessary to accomplish these purposes.
D. Preliminary Operations and Testing:
1. Motor driven equipment shall be tested for correct rotation and completion of all connections.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 2
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Provide submittals in conformance with the requirements of Section 13 11 00. Requests for substitutions shall conform with requirements of Article 1.10.A of Section 13 11 00.
B. Required submittals include:
1. Conduit and Fittings as specified in Article 2.02 of this Section.
2. Panelboards as specified in Article 2.08 of this Section.
3. Circuit Breakers as specified in Article 2.09 of this Section.
4. Motor Starters as specified in Article 2.12 and 2.13 of this Section.
5. Fuses as specified in Article 2.15 of this Section.
6. Time Clocks as specified in Article 2.16 of this Section.
7. Ground Fault Circuit Interrupters as specified in Article 2.17 of this Section.
8. NEMA Type 4x corrosion resistant UL 50, 50E & NEMA 250 rating for enclosures, cabinets and boxes as specified in Article 2.11 & 2.18 of this Section.
C. Submit proof of qualifications as specified in Article 1.02.A of this Section.
1.04 PRODUCT HANDLING
A. Delivery: Deliver all materials to the Project Site in the manufacturer’s original unopened containers with all labels intact and legible.
B. Storage: Store all materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project site.
C. Protection: Use all means necessary to protect Spray Ground electrical materials before, during, and after installation and to protect the installed Work specified in other Sections.
PART 2 PRODUCTS
2.01 MATERIALS, GENERAL
A. Materials shall be new, in unbroken packages and bear the U.L. label of approval.
B. Equipment of one type shall be by same manufacturer. One type of equipment for classifications such as:
1. Switchboards, panels, buss duct, disconnect switches and allied items.
2. Conduit.
3. Wire.
4. Conduit fittings.
5. Fixtures of the same general type.
6. Wiring devices.
2.02 CONDUIT AND FITTINGS
A. Conduit within or under buildings or where exposed outdoors shall be rigid metal threaded, hot dipped galvanized, or U.L. approved plastic except where noted otherwise on the Drawings.
Metallic conduit shall be of the same metal between outlets or terminals.
B. Use flexible metallic conduit only for short connections of motors and where specifically called for on Drawings. Maximum length shall be 40". Use only liquid tight flexible metal conduit.
Install an unbroken #12 AWG insulated copper grounding conductor in each liquid tight flexible conduit with permanent connection at motor junction box and service panel ground.
C. Protect, before installation, metallic conduit runs in all slabs laid on grade or in contact with the earth or exposed in damp locations, with two (2) heavy coats of asphaltum rust-resisting compound.
D. Encase conduits 2-1/2" or larger run underground, outside, or under buildings, in concrete envelopes a minimum of 3" thick, except as indicated otherwise on Drawings or stubouts.
Conduits 2 and smaller laid 18" below finish surface in soil.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 3
E. Low voltage runs underground outside buildings, 1-1/4" or smaller, may be G.I. or sherardized steel conduit, with machine applied wrapping equal to double wrap or Scotch-Wrap #50 tape, half lapped and quadrupled at joints in lieu of concrete encasement.
F. Service conduits through foundations or concrete members shall run through metal sleeves with adequate clearances for full movement of the conduit. Do not run conduits through footings.
G. Secure conduits run exposed on surfaces with one-hole heavy-duty straps or fasten with matching fittings to inserts or trapezes, parallel to building walls and ceilings.
H. Cap all conduit or duct stub-outs with standard factory caps; except cap threaded steel conduit with B.I. water pipe caps in outdoor locations.
I. Use conduit fittings as manufactured by Crouse-Hinds Company, Appleton Electric Co., or approved equal.
J. Employ U.L. liquid tight fittings for use with liquid tight flexible metal conduit.
K. Use unions as manufactured by Appleton, O-Z/Gedney, or approved equal. The use of running threads will not be permitted.
L. Exposed conduit and fittings in chemical rooms shall be nonmetallic rigid polyvinyl chloride, corrosion resistant rated suitable for installation in corrosive environments and in accordance with the latest NEC requirements.
2.03 EQUIPOTENTIAL BONDING/GROUNDING
A. Bond together and ground to a common ground at a single point all metallic conduit, piping systems, pool reinforcing steel, metal parts of ladders, lifeguard stands, handrails and their supports and the like. The solid copper bonding conductor shall not be smaller than #8 copper.
Provide equipotential bonding per Article 680 of the National Electrical Code. In instances where no deck reinforcement is present, Contractor shall provide a minimum of three feet of equipotential bonding material in conformance with Code. All bonding items shall be inspected prior to concrete pour
2.04 WIRING CONNECTIONS
A. Make connections without strain on conductors, allowing the conductors to take a natural position after connections or taps are made. Include all strand of wire in making the connection.
B. Make connections for wiring by one of the following means:
1. Make all taps or connections to conductors with compression type connectors except those smaller than #8 B&S gauge may have soldered connections. Solderless connections for #10 AWG or smaller may be used and shall be "Scotchlok", Buchanan, or approved equal. For #8 AWG or larger, they shall be T&B "LockTite", Burndy "Versitaps", or approved equal.
2. All cable or conductor terminal lugs shall be Burndy "Quicklug", Ilsco, or approved equal.
Two piece stamped lugs and solder lugs will not be approved.
3. Paint taped splices in damp or outdoor locations with two (2) coats of insulating paint.
4. Tag all branch circuit wires with circuit number at the panelboard and at each point of use with linen or plastic tags.
2.05 CONDUCTORS
A. Copper RHW or THW. Do not make splices between boxes.
2.06 COLOR CODING
A. Neutrals (identified conductors shall be white).
B. Phase conductors shall be red for phase B; blue for phase C.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 4
C. Green shall be used for mechanical equipment and receptacle grounds only.
2.07 MOTOR WIRING
A. Make final connections to motors with the required AWG (Minimum #12), Flamenol machine tool wire, 19 strand. Control wiring for equipment shall be Flamenol machine tool wire, 19 strand of required AWG. Provide corrosion resistant junction boxes at each item of equipment to change from standard building wiring to machine tool wire.
B. Phase motors as proper in direction of rotation.
2.08 PANELBOARDS
A. Panelboards shall be flush or surface mounting as indicated with circuit breakers as shown on panel schedule, hinged lockable doors, index card holders and proper bussing.
B. Where indicated on the drawings, panelboards shall be furnished with subfeed breakers and/or lugs, split bussing, contractors, time switches, relays, etc., as required.
C. All panelboards shall be keyed alike.
D. All panelboard enclosures shall be corrosion resistant rated NEMA 4X in accordance with the latest NEC requirements.
E. Furnish corrosion resistant panelboard enclosures and terminal cabinets with Yale 46515 flush locks and LL806 keys except where indicated otherwise herein. Fasten the trim to panel boards and terminal cabinet by means of concealed, bolted or screwed fasteners accessible only when the door is open.
F. Panelboards 208/120 volt, three phase, 4 wire, S/N or 120/240 volt, single phase, 3 wire, S/N.
Panelboard types as manufactured by:
Westinghouse Type B10B
General Electric Type NLAB
Square D Type NQOB
G. Panelboards for 480/277 volt, three panes, 4 wire, S/N.
Panelboard types as manufactured by:
Westinghouse Type Pow-R-Line 2
General Electric Type AE
Square D Type NEHB
Sylvania Type NH1B
I.T.E. Type Approved Equal
H. Panelboard for bussing sizes thru 400 amp shall be 20" wide surface mounted type. Recess mounted type shall have a 20" wide (maximum) recess metal enclosure with trim plate cover extending 1" on all sides of enclosure. Depth shall be 5-3/4" nominal. Height of panel as required for devices.
I. Provide 6" additional gutter space in all panels where double lugs are required, or where cable size exceeds bus size. Minimum bottom gutter space shall be 6" high. 12" additional gutter space may be required for aluminum feeders where used.
J. Panelboards shown on the drawings with relays, time clocks or other control devices shall have a separate metal barriered compartment mounted above panel with separate hinged locking door to match panelboard. Provide mounting sub-base in cabinet for control devices and wiring terminal strips.
K. Panelboard shall have a circuit index card holder removable type, with clear plastic cover.
Index card shall have numbers imprinted to match circuit breaker numbers.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 5
2.09 CIRCUIT BREAKERS
A. Breakers shall have a minimum short circuit interrupting rating of 10,000A symmetrical for panelboard voltage thru 240 volt and 14000A for panelboards thru 600 volts or as specified on the drawings. In no case shall the interrupting rating be less than the bus withstand rating unless noted otherwise on the drawings.
B. Circuit breakers as manufactured by the following companies only are acceptable:
1. General Electric Company
2. Square D Company
3. Westinghouse Company
4. I.T.E. Company
C. Circuit breakers shall be arranged in the panels so that the breakers of the proper trip settings and numbers correspond to the numbering in the panel schedules on the drawings. Circuit numbers of breakers shall be black-on-white micarta tabs or other previously approved method.
Circuit number tabs which can readily be changed from front of panel will not be accepted.
Circuit number tabs shall not be attached to or be a part of the breaker.
D. Where two or three pole breakers occur in the panels, they shall be common trip units. Single pole breakers with tie-bar between handles will not be accepted.
E. All circuit breakers shall be padlockable in the "off" position. Locking facilities shall be riveted or mechanically attached to the circuit breaker (submit sample for approval). Other means of attachment shall not be accepted without prior written approval of Architect/Owner.
F. Where branch circuit breakers supply the power to motors and signal systems, the breakers shall be furnished with lockout clips, mounted in the "on" position. The breakers shall be able to trip automatically with lockout clips in place.
G. Panelboard circuit breakers shall be bolt-on type.
2.10 BUSSING
A. Bussing shall be rectangular cross section copper, or full length silver or tin-plated aluminum.
B. Bussing shall be braces to withstand symmetrical short circuit ratings as follows or as noted on drawings. In no case shall bus short circuit bracing be less than specified circuit breakers.
C. Each panelboard shall be equipped with a ground bus secured to the interior of the enclosure.
The bus shall have a separate lug for each ground conductor. No more than one conductor shall be installed per lug.
2.11 MECHANICAL EQUIPMENT ENCLOSURES, TERMINAL CABINETS & MISC CABINETS A. All Spray Ground mechanical equipment enclosures, terminal cabinets and miscellaneous cabinets in the Spray Ground mechanical room or chemical storage rooms shall be corrosion resistant rated in accordance with the latest NEC requirements. Enclosures and all cabinets shall be flush mounted (except where noted a surface) of the size indicated on the drawings, and complete with hinged lockable doors and the number of 2-way screw terminals required for termination of all conductors. Terminal cabinet locks to operated form same key used for panelboards. The trim to terminal cabinets shall be fastened by means of concealed bolted or screwed fasteners accessible behind door to terminal cabinets. Terminal cabinets shall have 5/8" plywood backing.
B. Provide engraved nameplate on each enclosure and cabinet indicating its designation and system (i.e., Spray Ground - Panel ‘WP’).
2.12 MOTOR CONTROL INDIVIDUAL STARTERS
A. Manual Motor Starters:
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 6
1. Provide flush or surface mounting manual motor starters with number of poles and size of thermal overload heaters as required for the motor being controlled (equipped with overload heaters, one for each motor lead). Back boxes shall be supplied with all flush mounting starters whether they are toggle type requiring only a 4" square outlet box or the larger type requiring a special box and cover designed to accept the particular unit. All box types shall be corrosion resistant rated in accordance with the latest NEC requirements.
2. Unless otherwise noted on the drawings, all manual starters for single phase motors, smaller than 1 h.p., shall be the compact toggle type. Manual starters for all single phase motors, 1 to 5 h.p., and all three phase motors up to 5 h.p. shall be the heavy duty type.
3. Where manual motor starter is shown with pilot light, the pilot light shall be installed in a separate outlet box adjacent to the starter outlet, and engraved nameplate in indicate function of pilot light.
4. The following motor starters as manufactured by:
Manufacturer Single Phase
1HP and Below
Others
Arrow Hart Type RL Type LL
General Electric CR 101 Class CR 1062
I.T.E. Class C10, C11 or C12 Class C20
Square D Company Class 2510, Type A Class 2510, Type B & C Westinghouse Type MS Type A100
Allen Bradley Approved Equal Approved Equal.
B. Individual Magnetic Motor Starters:
1. Magnetic motor starters shall be A.C. line voltage, across-the-line units in a corrosion resistant rated enclosure in accordance with the latest NEC requirements.
2. All starters located outside of a building whether or not indicated shall be W.P. (weatherproof), and all starters noted W.P. shall be furnished in a corrosion resistant rated stainless steel enclosure in accordance with the latest NEC requirements.
3. Starter shall be horsepower rated for the motor controlled, and shall be equipped with properly sized overload elements. Every pole shall be with overload element.
4. Verify the exact motor current and voltage characteristics with the Contractor supplying the motor before installation of a starter.
5. Each starter shall be equipped with "Hand-Off-Auto" switch or stop-start pushbutton as required.
6. Coils shall be designed to operate on voltage indicated on control diagrams and have built-in-under the voltage release for coil circuit to drop motor starter off the line when the line voltage drops below normal operating voltage.
7. The coil control circuit shall be independently fused, sized to protect coil.
8. Starters to be equipped with running pilot light indication with a "Push-to-Test" feature.
9. Magnetic starters shall have a minimum of two auxiliary contacts. Additional auxiliary contacts shall be provided as required to comply with the requirements of the wiring diagrams on the electrical and mechanical drawings and the description of the function in the Mechanical Section of the Specifications.
10. Starters shall comply with NEMA standards, size and horsepower ratings as indicated on drawings.
11. The following types of magnetic motor starters as manufactured by:
Manufacturer Type
General Electric Class CR 106
I.T.E. Class A20
Square D Company Class 8536
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 7
Westinghouse Type A200 (Size 4 Max.) or
Class II-200 (Sizes 5-8)
2.13 INDIVIDUAL COMBINATION MOTOR STARTERS
A. Combination starter shall incorporate fused disconnect switch and individual magnetic motor starter. Combination starters shall be mounted in a corrosion resistant rated enclosure in accordance with the latest NEC requirements.
B. Starters shall comply with NEMA standards, size and horsepower ratings as indicated on drawings General Electric, Square D, Westinghouse or I.T.E.
C. The disconnect handle used on combination starters shall control the disconnect device with the door opened or closed. The disconnect handle shall be clearly marked as to whether the disconnect device is "ON" or "OFF", and shall include a two-color handle grip, the black side visible in the "OFF" position indicating a safe condition, and the red side visible in the "ON" position indicating an unsafe or danger condition.
D. All starters used in combination starters shall be manufactured in accordance with the latest published NEMA standards, sizes, and horsepower ratings. These starters shall be furnished with three melting alloy type thermal overload relays.
E. Thermal units shall be of one-piece construction and interchangeable. The starter shall be inoperative if a thermal unit is removed.
2.14 MOTOR CONTROL CENTER, INTERLOCKS AND CONTROL DEVICES A. Refer to mechanical and plumbing drawings and specifications and provide all control devices including timeswitches, relays and interconnection of starters as required.
B. Mount all relays and timeswitches in a separate compartment in motor control center unless otherwise indicated.
C. Whether shown on mechanical and plumbing drawings or control center schedules or not, where motors are controlled by external devices (i.e., thermostats, relays, float or pressure switches, etc.) or interlocked with other motors, each motor starter to be equipped with a "Hand-Off-Auto" selector switch in starter cover. Other starters equipped with a "Start' Stop" pushbutton station in starter cover. The Contractor shall be responsible to submit a complete and detailed set of shop drawings, electrical schematic design along with electrical component cut sheets from the MCC panel or the interlock control device manufacturer. RSD Total Control:
Allan Pearson 949-380-7878, South Coast Controls: Anthony Ellis 714-998-5656, H2O Integration Controls, Mike Macri, 253-244-1576 or approved equal.
2.15 FUSES
A. Fuses shall be dual element, current limiting type, U.L. Class RK5 unless otherwise indicated on the drawings. Provide one spare set of fuses of each size and type in each motor control center.
2.16 TIME CLOCKS
A. Time clocks shall be provided for all underwater lighting systems and Spray Ground circulation pumps not controlled by filter microprocessors.
B. Contacts shall have a minimum rating of 40 amperes at 277V.
C. Timing motor shall be heavy duty synchronous, self starting, high torque type, and shall be rated at 120, 208, 240, 277 volt 60 Hz.
D. Motor shall operate normally at temperature range of -60 degrees Fahrenheit to +120 degrees Fahrenheit.
E. Dial shall be 3" diameter, clearly calibrated with day/night zones and 24 hour rotation, with gear to provide one revolution yearly which automatically varies the on/off settings each day For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 8
according to seasonal changes. Day and month of the year shall show clearly through calendar window on the dial.
F. Time clocks shall be equipped with 7-spoke omitting wheel marked with days of the week.
G. Time clocks shall be housed in a corrosion resistant rated enclosure in accordance with the latest NEC requirements.
H. Acceptable manufacturers are Intermatic, Tork, Paragon, or approved equal.
2.17 GROUND FAULT CIRCUIT INTERRUPTERS
A. Minimum rating shall be 20 amperes, 125V, 5 milliampere trip setting, Class A per UL943.
B. Manufacturer to be Crouse-Hinds, Leviton, or approved equal.
2.18 BOXES
A. Boxes shall be of the size required by ordinances or larger, must be corrosion resistant in accordance with the latest NEC requirements where concealed or exposed on ceilings or walls.
B. Outlets to be surface where wiring is exposed and flush in areas where conduit is concealed.
C. Provide surface outlets with proper corrosion resistant surface covers. Box and cover shall be deep enough to provide at least 1/4" clearance between back of device and back of box.
Where box contains more than one device, use a corrosion resistant rated gang box with proper cover in accordance with the latest NEC requirements. Surface outlet boxes shall be of the threaded hub type wherever below 8'0".
D. If necessary for cable installation, additional pull boxes or junction boxes may be installed in accessible locations. Exposed pull boxes and junction boxes shall be corrosion resistant rated in accordance with the latest NEC requirements.
E. Where exposed to weather pull boxes larger than outlet boxes are required, galvanized code gauge sheet steel boxes may be used with covers attached by brass machine screws may be used. Boxes exposed to the weather shall be approved for the purpose, and conduit entrances shall be on the bottom made by means of an interchangeable hub with gasket and adapter nut.
Pull boxes not shown on Drawings may be added only after approval of size and location is obtained.
F. For outlets exposed to weather or where noted, cast outlet boxes shall be Crouse-Hinds, Appleton, or approved equal. Boxes shall have proper number and size hubs. Device plates, covers, adapters and boxes shall be as manufactured by Crouse-Hinds, Appleton, or approved equal.
G. Exposed junction boxes, outlet boxes and pull boxes for chemical rooms shall be non -metallic suitable for a corrosive environment and in accordance with the latest NEC requirements.
2.19 IDENTIFICATION MARKINGS
A. Plainly mark all motor and electrical appliance control equipment indicating the equipment controlled with engraved metal tags.
B. Provide laminated plastic nameplates on panelboards on the outside of the door at the top indicating panel designation and feeder source.
C. Provide laminated plastic nameplates on distribution switchboards and motor control centers at the top center indicating panel designation and feeder source.
D. Identify each distribution switchboard and motor control center circuit breaker with a laminated plastic nameplate indicating its' use.
E. Type panelboard directories on the forms provided with the equipment, indicating the use of each branch circuit breaker.
F. Fasten all laminated plastic nameplates to surfaces with two (2) or more screws.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 9
PART 3 EXECUTION
3.01 INSPECTION
A. Verify conditions at the Project site before submitting bid. Be responsible for providing all necessary wiring for the new electrical systems. Wherever wiring is being disrupted due to remodeling or changes, reconnect existing and provide new wiring circuits to accomplish a fully operable system at no additional cost to the Owner.
3.02 COORDINATION
A. The Drawings are essentially diagrammatic and indicate the desired location, size, routes, connection points, etc., and are to be followed as closely as possible. Proper judgment must be exercised in executing the Work so as to provide the best possible installation in the available space and to overcome difficulties, limitations or interference wherever encountered.
Be responsible for the correct placement of this Work, the proper location and connection in relation to Work of other trades, for determining the exact location of all conduits, outlets and equipment, and for installing the conduits in such a manner as to conform to the structure, avoid obstruction, preserve headroom and keep openings and passageways clear. Particular attention is directed to the close coordination required on exposed Work. Locations shown on Architectural or Mechanical Drawings if different than those shown on Electrical Drawings should be communicated to the Architect/Owner in writing for clarification.
3.03 INSTALLATION
A. Trenching and Backfill: Conform with requirements of Section 13 11 01. Provide minimum cover as required by Code.
B. Conduit Installation:
1. Conduit and metallic raceway systems shall be mechanically and electrically continuous from sources of current to all outlets in a manner to provide a continuous grounding path.
Close ends of conduit during construction to prevent entrance of dirt or moisture.
2. Securely fasten conduit to the building construction within three feet of each outlet and within every ten feet thereafter. Secure it to boxes, cabinets, pull boxes, terminals with two locknuts and ends equipped with bushings or a terminal fitting. Cut square with ends carefully reamed.
3. Make bends or elbows so that the conduit will not be injured or flattened.
4. Use insulated metallic bushings in all places where bushings are required.
5. Run exposed conduits level or plumb and parallel to the construction members of the building. No cutting across or diagonal runs will be permitted. Neatly surmount structural obstructions encountered on conduit runs by the use of fittings or pull boxes.
6. Identify feeder conduits by stamped metal tags secured to exposed section of conduit in main or sub-panels.
7. Make up all threaded conduit joints gas and watertight with conductive sealer except conduit above ground in dry indoor locations.
8. Rigidly support all boxes independently of the conduit system.
C. Connections to Equipment:
1. Fully connect, in an approved manner, all electrical outlets, apparatus, motors, equipment, fixtures, wiring devices and appliances whether they are installed under the Electrical Contract or not, which require electrical connections, to the corresponding electrical system outlet.
2. Where the Work of this Section requires connections to be made to equipment that is furnished and set-in-place under other Sections, obtain such roughing-in dimensions from the manufacturer or supplier of each item as required and assume full responsibility for the installation of the connections thereto.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Spray Ground Electrical
131108 - 10
3.04 ADJUSTMENT AND CLEAN-UP
A. Preliminary Operation: Should the Architect/Owner deem it necessary to operate the electrical installation or any part thereof prior to Substantial Completion of the Work, consent to such preliminary operation and supervise conduction of same. Subcontractor shall pay all costs occasioned by such operation. Preliminary operation shall not be construed as an acceptance of any Work installed under this Contract.
B. Clean-up: Upon completion of the Work of this Section, immediately remove all Spray Ground electrical materials, debris and rubbish occasioned by this Work to the approval of the Architect/Owner.
END OF SECTION
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 1
SECTION 220000
PLUMBING
PART 1 - GENERAL
1.01 The General Conditions apply to all work of this Section.
1.02 DESCRIPTION
A. Work Included: All labor, equipment, material, services, transportation, etc. required for and reasonably incidental to the complete and satisfactory installation of all of the Plumbing Systems as indicated on the Drawings or specified herein.
B. Work under this Section includes:
1. All plumbing systems, materials, fixtures, and equipment and the complete installation thereof including all piping, final connections to all mechanical equipment, and rough-in where indicated.
2. All utilities including water, liquid propane, and sewer lines and all necessary permits for utility service.
3. Excavation and backfilling for all underground lines.
4. Rough-in and final connections of equipment furnished by others.
5. All access panels and other accessories furnished complete and installed.
6. All required backflow prevention and pressure reducing devices. (The contractor shall verify site water pressures prior to bid and provide reducing valves for all pressures over 80 p.s.i.).
C. Related Sections
1. 13 11 00 Spray Ground General Requirements
2. 13 11 06 Spray Ground Equipment
3. 13 11 07 Spray Ground Mechanical
1.03 SUBMITTALS AND SHOP DRAWINGS
A. Contractor agrees that shop drawings submittals processed by the Architect do not become Contract Documents and are not Change Orders; that the purpose of the shop drawings review is to establish a reporting procedure and is intended for the Contractor's convenience in organizing his work and to permit the Architect to monitor the Contractor's progress and understanding of the design. The process of review of the Contractor's submittals is not of testing the Architect's perception. If deviations, discrepancies or conflicts between shop drawings submittals and the Contract Documents are discovered either prior to or after the shop drawing submittals are processed by the Architect, the Contractor agrees that the Contract Documents shall control and shall be followed.
B. Materials and equipment: As soon as possible and within 21 days after award of the contract, and before their purchase, the Contractor shall submit to the Architect seven (7) bound booklets for approval containing a complete list of materials, specialties and equipment he is to furnish for the installation. All submittals shall be made at one time.
C. Each item shall be identified by manufacturer, brand and trade name, number, size, rating and whatever other data are necessary to properly identify and check the materials and equipment. The words, "as specified" will not be considered sufficient identification.
D. Accessories, controls, finish, etc., not submitted or identified with the submitted equipment shall be furnished and installed as specified.
E. Shop drawings will be approved only to extent of information indicated. Approval of an item of equipment shall not be construed to mean approval for components for that item for which Contractor has provided no information.
F. Approval of shop drawings shall not relieve Contractor of responsibility for providing all For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 2
controls, wiring, components, etc. which are shown or specified, or all additional controls, wiring, components, etc. required to provide complete and correctly operating mechanical systems.
1.04 SUBSTITUTIONS
A. Should the Contractor desire to substitute any material, equipment or other items for those specified, he shall submit a compete list, including detailed equipment layouts and performance characteristics within 21 calendar days after the schedules Start of Construction. Said data shall be submitted in 7 copies, assembled in individual brochures.
B. The entire cost of all changes of any type due to substitution for materials specified shall be born by the Contractor at no extra cost to the Owner.
C. Unsolicited and voluntary deducts, on the part of the Contractor for substituting unapproved systems and/or equipment, shall not be considered for the purpose of awarding the Contract.
D. The Contractor shall submit the amount of cost credit to the Contract in the event the proposed substitution is accepted.
E. In all cases where substitutions are proposed after bids are received, the Contractor shall bear the cost of evaluation on the basis of 2-1/2 times technical salaries of engineering personnel involved.
1.05 AVAILABILITY OF SPECIFIED EQUIPMENT
A. Verify prior to bidding that all specified equipment is available and can be obtained in time for installation during orderly and timely progress of the work.
B. In the event that specified items will not be so available, notify the Architect prior to receipt of bids.
C. Costs of delays because of non-availability of specified items, when such delays could have been avoided by proper investigation on the part of the Contractor, will be back-charges as necessary and shall not be borne by the Owner.
1.06 AS-INSTALLED DRAWINGS
A. The Contractor shall arrange and pay for one set of white prints of the plumbing drawings which he shall alter in read to show all changes made to the original layout. These drawings shall be kept current.
B. The Contractor shall deliver these completed to the Owner when the job is finished and accepted prior to final payment.
1.07 GUARANTEES
A. The Contractor, in accepting this contract, binds himself to replace or repair at his own expense any defect in workmanship or material which may appear within a period of one year from the date of the final acceptance of the building, and to pay for all resulting damage which shall appear within the said period; provided always that the Contractor shall not be liable for anything attributable to acts of the servants and agents of the Owner, or for ordinary wear. Also, given date of work performed by the Contractor be accepted as complete, he shall agree to correct any deficiencies or omissions in respect of the plans or specifications which may appear in the afore-mentioned twelve-month period.
B. The Contractor guarantees that all piping as provided in this specification will be free from all obstructions, and that all piping will be tight and drip free.
C. The Contractor guarantees that, in the entire domestic water system, a continuous and noiseless circulation of water will be established to all fixtures; and that water may be drawn from any fixture without hammering.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 3
1.08 LOCAL CONDITIONS
A. The Contractor and trade submitting tenders on this work shall visit and will be deemed to have visited the site to ensure that they are familiar with all conditions relating to the work.
Failure to visit the site will in no way relieve the successful Contractor of the necessity of furnishing any material or performing nay work that may be required to complete the work in accordance with the drawings and specifications without additional cost to the Owner.
B. Existing conditions, including inverts of drains, sizes and locations of existing sewers, water mains, gas mains, grades, etc., shall be examined by the Contractor prior to any installation or fabrication, and it shall be understood that the price quoted shall include al work necessary to provide a complete workable system within the requirements of appropriate codes and fully adapted to the existing conditions. The Contractor shall disconnect, seal off and remove any existing services where no longer required, and reroute services where necessary.
C. Before bidding the job, investigate, determine and verify locations and invert elevations of sanitary and storm sewers, city water mains and any of the buried or overhead utilities on or near site. Determine such locations in conjunction with all public and private utilities on or near site. Determine such locations in conjunction with all public and private utility companies and with all authorities having jurisdiction.
1.09 RULES, REGULATIONS AND CODES
A. All work and materials shall be in full accordance with the latest Uniform Plumbing Code, Uniform Building Code and local rules and regulations, State Fire Marshal regulations, the safety orders of the Division of Industrial Safety; the National Electric Code; the standards of the National Fire Protection Association; American Gas Association; Occupation and Safety Act; American National Standards Institute; American Society of Mechanical Engineers; American Society for Testing and Materials; Installation Standards published by the International Association of Plumbing and Mechanical officials (IAPMO) and other applicable laws, codes, or regulations. Nothing in these performance specifications shall be construed to permit work not conforming to these codes.
B. Electrical Work: Motors, electrical apparatus and wiring specified in this Section shall conform to the National Electrical Manufacturer's Standards and the National Electric Code and bear the Underwriter's label or approval.
C. The Contractor shall furnish, without extra charge, any additional material and labor when and where required to comply with these rules and regulations, though the work be no mentioned in these specifications or shown on the Drawings. When these Specifications or drawings call for or describe materials or construction of a better quality or larger sizes than required by the above-mentioned rules and regulations, the provisions of these specifications and accompanying drawings shall take precedence.
1.10 FEES AND PERMITS
A. The Contractor must obtain and pay all fees for permits, licenses, inspections, etc., which are required by any legally constituted authority. Co-ordinate exact requirements with the Owner and/or General Contractor prior to bid.
1.11 COORIDNATION
A. Following the general arrangement indicated on the Drawings as closely as possible, the Contractor shall coordinate with the Architect, structural, mechanical, plumbing, electrical and all other trades prior to installation of the materials and equipment to verify adequate space available for installation of the work shown. The Architect and Engineer shall be immediately notified if an area of conflict occurs between trades.
B. The Contractor shall bear all costs incurred for work that must be relocated due to conflicts For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 4
between trades.
C. The Plumbing Contractor shall coordinate all requirements for all points of connection with the General Contractor and other trades prior to bid.
1.12 DRAWINGS
A. The work shall be installed as indicated on Drawings, however, changes to accommodate installation of this work with other work, or in order to meet architectural or structural conditions, shall be made without additional cost to the Owner.
B. For the purpose of clarity and legibility, the Drawings are essentially diagrammatic to the extent that many off-sets, bonds, unions, special fittings and exact locations are not indicated. The Contractor shall make use of all data in all of the Contract Documents and shall verify this information at the site.
1.13 INSPECTION
A. The Contractor shall not allow or cause any of his work to be covered up or closed in until it has been inspected, tested, approved by all authorities having jurisdiction, and until Project Record drawings have been properly annotated.
B. Should any of his work be covered up or closed in before such inspection, he shall, at his own expense, uncover the work to the satisfaction of the inspection party. All related repair work cost shall be borne by the Contractor.
1.14 DELIVERY, STORAGE AND PROTECTION OF PROPERTY
A. Place orders for all equipment in time to prevent any delay in construction schedule or completion of project. If any materials or equipment are not ordered in time, additional charges made by equipment manufacturers to complete their equipment in time to meet construction schedule, together with any special handling charges, shall be borne by the Contractor.
B. Materials shall be delivered in ample quantities from time to time as may be necessary for the uninterrupted progress of the work. They shall be stored so as to cause the least obstruction to the premises and distributed so as to prevent overloading to any portion of the structure.
C. The Contractor shall provide temporary storage and shop areas that are required at the site for the safe and proper storage of materials, tools, and other items used int he performance of this work. These areas shall be constructed only in approved locations and shall not interfere with the work of any other Contractor.
D. All work, equipment and materials shall be protected at all times. The Contractor shall make good all damage caused either directly or indirectly by his own workmen. The Contractor shall also protect his own work from damage. He shall close all pipe openings with caps or plugs during installation. He shall protect all of his equipment and materials against dirt, water, chemical and mechanical injury. Upon completion, all work shall be thoroughly cleaned and delivered in a new condition.
1.15 DEFINITION OF “PIPING”
A. The term "piping" as used in these Specifications or on the Drawings shall mean all pipe, fittings, nipples, valves, unions, etc., as may be required for a complete and functional system.
1.16 DAMAGE BY LEAKS, ETC.
A. The Contractor shall be responsible for all damage to any part of the premises or work of other Contractors, caused by leaks or breaks in the piping or equipment furnished and/or installed under this Section, during the construction and guarantee period.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 5
1.17 ACCESS TO EQUIPMENT FOR MAINTENANCE
A. Install all equipment, piping, etc. to permit access for normal maintenance. Install all such equipment and accessories to facilitate maintenance. Perform any relocation of pipes, etc. required to permit access at request of Architect at no additional cost to Owner.
PART 2 - PRODUCTS
2.01 GENERAL
A. All materials and equipment shall be new and of the best of their respective grades, free from all defects and of the make, brand or quality herein specified or as accepted by the Architect.
B. All materials and equipment shall be identified by manufacturer's name or name plate data.
Unidentified material or equipment shall be removed from the site.
C. Equipment specified by manufacturer's number shall include all accessories, controls, etc., listed in the catalog as standard with the equipment. Optional or additional accessories shall be furnished as specified.
D. Where no specific make of material or equipment is mentioned, any first class product of a reputable manufacturer may be used, provided it conforms to the requirements of the system and meets with the approval of the Architect.
E. Equipment and materials damaged during transportation, installation and operation shall be considered as "totally damaged" and shall be replaced with new. Any variance from this clause shall be made only with written approval of the Architect.
F. Exact locations and mounting heights of all fixtures shall be obtained from the architectural drawings.
G. Water closets, urinals, lavatories, etc., shall be as manufactured by American Standard, Kohler, or Eljer. (Refer to fixture specifications for exact details).
H. Furnish all fixtures complete with necessary trim and stops, chrome plated brass, including tailpieces, traps and escutcheons.
I. Water closet carriers shall be of commercial quality and shall be as manufactured by J.R.
Smith, Zurn or Josam.
J. For specific fixtures and equipment to be furnished and installed, see the fixture schedule on the Drawings and co-ordinate with the Owner prior to bid.
2.02 PIPE AND FITTINGS
A. Water Piping:
1. Inside Building and Exposed: Type "L" copper pipe, hard drawn, 95/5 solder with cast wrought copper solder fittings and adapters for screw pipe connections (Type "K" with silver brazed fittings below slabs).
2. Outside Building Below Grade: Shall be Type "L" copper pipe and fittings as specified for inside water piping.
B. Waste Piping (Sanitary Sewer System):
1. Inside Building and Within 5'-0" of Building Line:
No-hub, cast iron Soil Piping and Fittings, asphaltum coated and shall meet Commercial Standard CS188-66. Joints below grade shall be made with M.G. or A.B. & I "Best" couplings. Joints above ground shall be made with Ideal stainless steel bands, M.G. or A.B. & I "Best" couplings.
C. Vent Piping:
1. Underground or Concealed in Walls or Above Ceiling Spaces: Cast iron pipe and For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 6
fittings as specified for waste pipe.
2. Exposed: galvanized steel pipe, Schedule 40, ASTM A-120, with 125 pound galvanized cast iron screwed fittings, ASA B 16.4-1949.
D. Natural Gas:
1. Inside Building, Above Floor: Schedule 40 black steel pipe, ASTM A-120, with 150 pound banded malleable iron screwed fittings. (Option: Piping 3" and larger may be welded using butt or socket type welding fittings. Mitered bends will not be permitted.)
2. Outside Building, Above Ground and on Roof: Schedule 40 galvanized steel, ASTM A-120, with 150 pound banded malleable iron screwed fittings.
2.03 VALVES AND UNIONS
A. General:
1. Piping systems shall be supplied with valves arranged so as to give compete and regulating control of piping systems throughout the building. Each group or battery of fixtures shall have shut off valves.
2. Valves shall be installed with the best of workmanship, with neat appearance and grouping, and so that all parts are easily accessible and serviceable.
3. Valves shall be of commercial quality, and shall be manufactured by Nibco, Appollo, Stockham, Jenkins, or Walworth.
B. Water Piping Valves:
1. 2" and Smaller: Nibco No. T-595-Y (threaded) or No. S-595-Y (soldered) ball valve with three piece body, full port, T.F.E. seats and bronze trim, 150 psi Class.
2. Check Valves: 4" and Smaller: Nibco No. T-433 (threaded) or No. S-433 (soldered), horizontal swing, renewable discs, and bronze body, 150 psi Class.
C. Gas Cocks:
1. 1/2" to 1-1/4": Crane No. 252, Walworth No. 591.
2. 1-1/2" and Larger: Nordstrom No. 142 and 143, or Walworth No. 1796 or 1797F.
D. Unions: Furnish and install at each threaded connection to all equipment or valves. The unions shall be located so that the piping can be easily disconnected for removal of the equipment, tank, or valve, and shall be as follows:
1. For steel pipe: Grinnell, Stockham, or equal, 250 pound class, galvanized or black steel to match piping in which union is installed.
2. For copper pipe: Nibco No. 733, or equal by Mueller or Jenkins.
2.04 MISCELLANEOUS PLUMBING ACCESSORIES
A. Hose Bibbs, Outside Building: Acorn or Chicago loose key, 3/4" hose end, 1/2" I.P.S.
Female inlet, vacuum breaker, rough brass finish.
B. Hose Bibbs, Inside Building: Same as for outside except with polished chrome finish.
C. Vent Pipe Flashing: 4 pound lead with steel boot, cast iron counter flashing sleeve, Semco 1100-5 with vandal proof hood.
D. Cleanouts: J.R. Smith or equal by Zurn or Josam.
1. Wall Cleanouts: J.R. Smith No. 4553, stainless steel, for ceramic tiled walls, and J.R. Smith No. 4422 with chrome plated cover for other types of walls.
2. Floor Cleanouts: J.R. Smith No. 4043 with bronze plug and non-skid top for finished floors; and J.R. Smith No. 4223 with bronze plug and X-X-H secured non-skid cast iron top for unfinished floors.
3. Cleanouts to Grade: J.R. Smith No. 4258 or 4253 with X-H bronze plug and X-X-H non-skid cast iron cover with lifting device set flush with surface for concrete areas.
Asphalt or non-surfaced ares shall be installed with a ring of concrete poured For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 7
around the bottom flange 6" below the surface. Use cast iron soil pipe on all cleanout risers. For Cleanouts in non-traffic areas, terminate cleanout plug in concrete yard box.
E. Access Panels: J.R. Smith, Zurn, or Josam, and shall be 12" x 12" minimum for concealed valves and other equipment in walls unless specified otherwise or required otherwise by field conditions. Ceiling access panels shall be 12" x 18" minimum.
1. Wall Access Panels: J. R. Smith No. 4762 with AKL, stainless steel finish.
2. Ceiling Access Panels: J. R. Smith No. 4760 with AKL, prime coated for plaster and dry wall ceilings; and J.R. Smith No. 4790 with AKL for acoustical tile ceilings.
F. Escutcheons unless otherwise specified shall be steel flange with locking device and chrome plated finish, Beaton Cadwell No. 10 or equal by Grinnell.
G. Insulation:
1. Hot Water Piping: Insulate all hot water piping with Manville "Micro-Lock" 850-AP-T with pressure sensitive tape. 1" thick for sizes up 10 2", 1-1/2" thick for sizes 1-1/2" and above. All fittings and valves shall be insulated with premolded "Zeston" PVC covers with factory supplied fiberglass inserts. Insulation shall conform to the Manufacturers recommendations. Hot water piping below floor or grade shall be insulated with "Protexulate" per Manufacturers recommendations.
2. Hot Water Heater and/or Storage Tank: Insulate with calcium silicate equal to Manville Thermo-12 or Ownes-Corning Kaylo 10, 2" thick. Install per manufacturers recommendations. Provide 8 ounce canvas over insulation and size with lagging adhesive. Factory fabricated jacket may be submitted for engineers approval.
3. All exposed insulation shall be covered with a .016" thick aluminum jacket.
H. Water Hammer Arresters: P.P.P. model P-2 or equal, with engraved model number. Install at all quick closing valves, commercial clothes washers and dishwashers behind access panel.
I. Temperature and Pressure Relief Valves: Watts Series 40 or equal.
J. Pipe supports, unless specified otherwise, shall be as follows:
1. Seismic bracing shall be per the State of California Requirements. a. Single pipe supports shall be "Super Strut" approval R.003 or equal. b. Trapeze supports shall be "Super strut" approval R.020 or equal.
2. Pipe Hangers shall be as follows:
a. Horizontal waste, vent and storm drain piping shall be:
1. 10" and smaller: Super Strut No. C-711 or equal.
b. Horizontal Gas Piping: Super Strut No. C-711 or equal. c. Horizontal Cold Water Piping: Super Strut No. C-711F or equal. d. Horizontal Hot Water Piping: Super Strut No. C-710 with C-790 or equal. e. Vertical Piping: Super Strut No. C-720 or equal.
f. Parallel Multiple Pipe Runs: Super Strut No. A-1202 channels with No. 702 pipe clamps for steel pipe and No. 701 pipe clamps for copper pipe.
3. Isolators: Stoneman Series 100 "Trisolator", or Super Strut No. C-715.
4. Connectors:
a. Bolt on locations and structure shall be Super Strut No. C-755-L or U-563 or equal.
b. Cast in place inserts shall be Super Strut No. 452 or No. C-302 or equal. c. Steel Deck Inserts shall be Super Strut No. C-4745 or equal.
5. Hanger Rods: Shall be Carbon steel Cold Drawn, continuous threads, Super Strut H-104 or equal.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 8
K. Traps, Strainers and Tailpieces: Every sanitary fixture, unless otherwise specified, shall be provided with a 17 gauge chromium tailpiece, a Los Angeles pattern cast brass trap, and wall flanges. Provide chromium plated brass casing between the trap and wall flanges with each fixture.
L. Fixture Supplies:
1. Supplies to lavatories, sinks and flush tank water closets shall be rigid and shall be equipped with chromium plated and polished screwed type angle compression stops with loose key square shank stems and lock shields extending beyond the stem as manufactured by "T & S Brass" or "Chicago" or approved equal.
2. Each supply or pipe which passes through or into wall, floor, ceiling, or furred space shall be equipped with a chromium plated and polished cast brass flange with a set screw.
PART 3 - EXECUTION
3.01 EXCAVATION AND BACKFILLING
A. Before laying of any pipe or digging of any trenches, the Contractor shall determine by actual excavation and measurement the exact locations and depth of existing utility and service lines to which he is to connect. In event depth of existing soil and waste lines is not sufficient to permit installation of piping as detailed on drawings or to make connection in manner indicated, the Contractor shall confer with the Architect and Owner’s representative before proceeding with this work.
B. The Contractor shall brace or crib all excavation and pump all water where required to prevent caving. Prior to bid the contractor shall inspect the ground where excavation is required to ascertain the structure of the soil. Additional consideration will not be allowed for unfavorable excavating conditions or for the encountering of stone, shale, or other substances.
C. The Contractor shall do all necessary trenching, excavation, shoring, backfilling, and compaction required for the proper laying of the pipe lines. The Contractor shall cooperate with the work to be done under separate sections in providing information as to openings required in rough walls, slabs and footings.
1. Backfill shall be clean soil free from rocks and debris. Compact to 90% of surrounding soil.
2. All pipes shall have not less than 18" of cover unless otherwise indicated ont he drawings.
D. Ascertain that all chases, shafts and openings are properly located; otherwise the Contractor shall cut all new openings required at his own expense and shall be held responsible for any damage done to other work unnecessary and/or careless cutting and drilling. No cutting, notching, or boring will be allowed that may impair strength of building construction; no holes, except for small screws, shall be drilled in beams or other structural members, without obtaining prior consent of the Architect. Execute all work with competent workman skilled in material involved. Patching materials and workmanship shall accurately match original work.
E. Trenches:
1. Dig straight to line and grade, bottom smoothed of any rock points. Where rock is encountered, excavate 3" below grade of the pipe and lay entire length on undisturbed original earth or placed sand. The bottom of trenches shall be shaped or packed for the pipe and duct fittings, hubs and couplings, using templates to fit the outside periphery of the lower third of the piping or ductwork.
F. Shoring:
1. All necessary shoring, sheeting and pumping shall be part of the work of this For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 9
Section.
G. Holes in concrete: Sleeves shall be furnished, accurately located and installed in forms before pouring of concrete. The Contractor shall pay all additional costs of cutting of holes as a result of the incorrect location of sleeves.
3.02 PIPING, FIXTURES AND EQUIPMENT
A. Pipe joints and connections:
1. Approved elastomeric ring joints, flexible compression joints, and no-hub couplings are acceptable and shall be by M.G., Ideal, or approved equal.
2. provide sufficient swing joints, ball joints, expansion loops, and devices necessary for seismic joints or flexible piping system drainage.
3. Copper tubing with solder joints shall be made up with 95/5 solder in accordance with manufacturer's recommendations for the service intended. Threaded adapters shall be used where required.
B. All piping passing through finished floors, ceilings, partitions or walls exposed to view shall be provided with chromium plated escutcheons. Escutcheons for insulated pipes shall fit over the insulation.
C. Isolate all water piping from clamps and pipe hangers with "Stoneman" Series 100 or by "Super Strut" No. C-715 isolators.
D. Where pipes pierce roof, extend pipe 7" above finished roof, except where specifically required to exceed this dimension by the applicable plumbing code, and provide roof flashing.
E. Support each pipe independently from other pipes. Do not use wire or plumbers tape for hanging or strapping pipes.
F. Pipe Sleeves:
1. All piping through any concrete floors, walls and roof shall have pipe sleeves installed before the concrete is poured. Space between piping and sleeve shall be packed with non-combustible material. Sleeves through floors shall be made watertight with mastic, non-staining compound which leaves a finished smooth appearance, or pack with noncombustible rope, or fiberglass to within 1/2" of both wall faces, and provide plastic water-proof compound.
2. All piping through any partition shall have 1/4" minimum clearance all around.
Install sleeves to protect piping from being anchored by the partition material. Pack space between sleeve and pipe with incombustible material.
3. Piping through any sound partition shall have 1/2" clearance between pipe and wall construction, this space shall be solidly caulked both sides of the wall.
4. Pipe penetrations through any existing concrete shall be core drilled. The opening through concrete shall be approximately 3/4" larger than pipe O.D. Space between pipe and concrete shall be caulked to full concrete thickness with a fire rated material. For vertical penetrations, caulk so that as little damage as possible shall be done to existing and remaining walls, floors, ceilings, and structural members.
5. Electrical Equipment Spaces: Do not run piping through transformer vaults and other electrical or electronic equipment spaces and enclosures.
G. Screwed steel piping shall be properly reamed. Pipe joint compound shall be "rectorseal" and shall be applied to male threads only.
H. Copper tubing shall be cut with copper tube cutters sized with a sizing tool and thoroughly cleaned before application of flux or solder.
I. Welded pipe shall be plain end and with beveled end fittings complying with ASA B16-9.
J. Copper tubing systems shall have IPS read brass pipe or nipples at all connections requiring For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 10
rigidity (at equipment, through roof, at anchors, etc.) K. Unions and Flanges:
1. Provide union and flanges at each connection to equipment and downstream of each valve. Install unions at both ends of valves, strainers, etc., when the valves, etc., could not be turned due to an obstruction.
L. Piping in any partitions, through plates, studs, etc., shall have sufficient clearance from the structure to allow for expansion and contraction of the piping. No bare piping shall touch wood, concrete, etc., at any time.
M. All closet bends, trap arms below floor, etc., shall be adequately blocked and secured. All piping installed above grade within buildings shall be secured to structural framing with Unistrut or pipe clamps to provide a rigid installation.
N. Isolate all Water Piping from structure with minimum 3/8" thick felt pads.
O. Pipe Hangers and Supports:
1. Securely fasten piping and equipment to building construction with hangers, supports, guides anchors or sway braces to maintain pipe alignment, maintain rigidity and to prevent noise or excessive strain on piping due to uncontrolled movement under operating conditions. Supports shall be designed for safety factor of 5 to 1 for gross weight of piping system including fluid and insulation.
2. Fasten rods to structural steel members with suitable beam clamps or to concrete inserts set flush with the surface. Install a reinforcing rod through opening in the concrete insert. Do not burn, weld or drill structural member unless prior approval is obtained from the Architect.
3. Where hanger rods are longer than 18 inches, provide a lateral brace every fourth hanger. Do not support any piping by wire, rope, wood or other makeshift devices.
Provide adequate additional steel support. Where building construction does not permit the hanger spacing as scheduled, coordinate with the Architect and structural engineer prior to bid and submit location details for review.
4. Each hanger shall be adjusted to carry its proper share of the load.
5. Provide sway bracing at every fifth hanger. Additional supports and/or braces shall be installed if, during test or normal operation, the piping should sway, crawl of vibrate.
6. Piping below any ductwork shall be supported from wall or on a trapeze with hanger rods outside of ductwork.
7. All piping, including valves, etc., shall be supported independently of equipment; no piping weight or stress due to expansion and contraction shall be transmitted to the equipment.
8. All insulated piping shall be provided with Super Strut No. C-790 steel protection shields between insulation and pipe hangers.
9. Pipe Hanger Spacing:
a. Vertical risers shall be supported at their bases and at each floor minimum. b. Horizontal piping spacing shall be as follows unless otherwise noted:
Material Size Center to Center
Steel 1/2" 6 feet
Steel 3/4" to 1" 8 feet
Steel 1-1/4" and larger 10 feet
Copper 1/2" to 1-1/2" 6 feet
Copper 2" and larger 10 feet
Cast Iron 1-1/2" and larger 5 feet and
at each fitting.
c. Hanger Rods, threaded:
Pipe Sizes Rod Sizes
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 11
(inches) (inch diameter)
2" and smaller 3/8"
2-1/2" and 3" 1/2"
4" 5/8"
d. Install a hanger within 12" of each change or direction and for each branch 5'-0" and longer.
10. All suspended no-hub cast iron piping shall be provided with cross bracing at a minimum 20 foot intervals and as recommended by the manufacturer.
11. All piping shall be laterally and longitudinally braced per S.M.A.C.N. and P.P.I.C. standards.
P. Installation of plumbing fixtures:
1. Install each fixture at the exact height and location shown on the architectural drawings.
2. Set fixtures, supplies, traps and trap outlets square with the wall, in line with fixture outlets without offsets, angles, or bends.
3. Grout joint between fixture and wall or floor with silicone sealant to provide a smooth, even, and watertight seal.
4. Watertight joints for drainage connections to all fixtures shall be made in accordance with the Uniform Plumbing Code.
5. Furnish all fixture complete with necessary trim and stops, chrome plated brass, including tailpieces, traps and escutcheons.
6. Connections to fixtures shall be in accordance with code requirements except as exceeded herein or on the Drawings, and in no case smaller than the supply stop size. Minimum waste sizes shall be 4" for water closets and 2" for lavatories.
7. Steel plate supports for wall hung fixtures shall be 3/8" thick by 6" wide steel plate recessed and lag screwed into wood studs or welded to steel studs and tapped for fixture bolts. Length and number of plates shall be as required to satisfactorily support the fixture to be installed. Plate shall be anchored to not less than three studs.
Q. All equipment, fixtures, etc... shall be installed in strict accordance with the manufacturers recommendations.
R. Flexible gas piping will not be permitted.
S. All piping penetrating the roof shall be separated from other piping and any roof equipment by a minimum of 18" to insure a proper pipe flashing installation.
T. For corrosive soil conditions, all cast iron floor sinks, floor drains, etc., shall be completely surrounded by 12" of sand on all sides.
3.03 INTERRUPTION OF SERVICES
A. Interruption of any existing services shall be kept to a minimum. Shutdowns shall be made only with approval of and at times designated by the Owner.
3.04 TEMPORARY SERVICES
A. Provide temporary services that will meet exiting demand when any existing services are interrupted in connection with work of this section beyond the period of time acceptable and approved by the Owner.
3.05 CANNING OPENINGS AND HANGER INSERTS
A. The Contractor is to make out, subject to the approval of the Engineer, the exact dimensions and positions of cannings which may be required in floors, roofs, ceilings or walls for the passage of piping, tubes, etc. The area of any opening is not to be larger than absolutely necessary for the proper fitting of the piping, tubes, etc. The Contractor shall furnish plans For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Plumbing
220000 - 12
and elevations, where necessary, showing the sizes and locations of all cans and required fittings through the building structure, and the locations and sizes of all inserts of hanger rods, anchors and other suspension points.
3.06 TESTING
A. The Contractor shall furnish all labor, materials, and equipment necessary and perform all required testing of all piping, fixtures, equipment, and accessories installed under this Section of the specification. All such plumbing installations shall be tested, repaired, and adjusted to the satisfaction of the Owner’s Representative and all governing authorities.
B. The Contractor shall perform all pressure tests required by codes, utility companies, and local governing authorities.
C. Leaks shall be repaired by remaking with new material. No makeshift leak stopping methods are acceptable.
D. Should any piece of equipment or material fail in any of the tests, it shall be immediately removed and replaced with new; the system shall again be tested by the Contractor.
Damaged equipment and materials shall be considered as "totally damaged" and any variance from this clause shall be made only with written approval of the Architect.
3.07 STERILIZATION OF DOMESTIC WATER LINES
A. Sterilize all domestic water lines from the meter to all outlets. This work shall be performed by an independent company specializing in this work.
B. Submit sterilization report to Architect for approval and indicate that the Coliform-Aerogenes organisms are negative, that the total plate count is less than 100 bacteria per cc, that the water is safe for consumption, and the job location.
3.08 COMPLETION OF INSTALLATION
A. Clean all equipment and materials thoroughly.
B. Show no tool marks or threads on exposed plated, polished, or enameled connections from fixtures. Tape finished surfaces to prevent damage during plastering.
C. Flush each unit of water supply and distribution system thoroughly with clean water at the highest velocities attainable.
D. Clean all piping, valves, traps, strainers, water heaters, tanks, etc., thoroughly and flush or blow out until free of scale, oil, silt, sediment, pipe dope, and all foreign matter of any kind.
END OF SECTION
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 1
SECTION 260000
GENERAL ELECTRICAL SPECIFICATIONS
PART 1 - GENERAL
1.01 WORK INCLUDED
A. This specification shall apply to all phases of Work hereinafter specified, shown on Drawings, or as required to provide a complete installation of electrical systems for this Project. The intent of the Drawings and Specifications is to provide a complete and operable electrical system that includes all documents that are a part of the Contract.
1. Work Included: Furnish labor, material, services and skilled supervision necessary for the construction, erection, installation, connections, testing, and adjustment of all circuits and electrical equipment specified herein, or shown or noted on Drawings, and its delivery to the Owner complete in all respects ready for use.
2. The Electrical Work includes installation or connection of certain materials and equipment furnished by others. Verify installation details, installation and rough-in locations from the actual equipment or from the equipment shop drawings.
B. Electrical Drawings: Electrical Drawings are diagrammatic, and are intended to convey the scope of work, indicating intended general arrangement of equipment, conduit and outlets.
Follow Drawings in laying out Work and verify spaces for installation of materials and equipment based on actual dimensions of equipment furnished.
C. Related Sections:
1. 13 11 00 Spray Ground General Requirements
2. 13 11 06 Spray Ground Equipment
3. 13 11 07 Spray Ground Mechanical
4. 13 11 08 Spray Ground Electrical
1.02 QUALITY ASSURANCE
A. Design, manufacture, testing and method of installation of all apparatus and materials furnished under requirements of these specifications shall conform to latest publications or standard rules of the following:
1. Institute of Electrical and Electronic Engineers – IEEE
2. National Electrical Manufacturers' Association – NEMA
3. Underwriters' Laboratories, Inc. – UL
4. National Fire Protection Association – NFPA
5. Federal Specifications - Fed. Spec.
6. American Society for Testing and Materials – ASTM
7. American National Standards Institute – ANSI
8. National Electrical Code – NEC
9. National Electrical Safety Code – NESC
10. Insulated Cable Engineers Association – ICEA
11. American Institute of Steel Construction – AISC
12. State and Municipal Codes In Force In The Specific Project Area
13. Occupational Safety and Health Administration (OSHA)
14. Electronics Industries Association/Telecommunications Industry Association (EIA/TIA)
15. California Electrical Code (where adopted)
16. Local Authority Having Jurisdiction (AHJ) Published Electrical Standards and Codes B. Perform Work in accordance with the National Electrical Code, applicable building ordinances, and other applicable codes, hereinafter referred to as the "Code." The Contractor shall comply with the Code including local amendments and interpretations without added cost to the Owner. Where Contract Documents exceed minimum For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 2
requirements, the Contract Documents take precedence. Where code conflicts occur, the most stringent shall apply unless variance is approved.
1. Comply with all requirements for permits, licenses, fees and codes. The Contractor, at Contractor’s expense, shall obtain all permits, licenses, fees, special service costs, inspections and arrangements required for Work under this contract, unless otherwise specified.
2. Comply with requirements of the applicable utility companies serving this Project.
Make all arrangements with utility companies for proper coordination of Work.
1.03 GENERAL REQUIREMENTS
A. Guarantee: Furnish a written guarantee for a period of (1) one-year from date of acceptance.
B. Wherever a discrepancy in quantity or size of conduit, wire, equipment, devices, circuit breakers, etc., (all materials), arises on the Drawing and/or Specifications, the Contractor shall be responsible for providing and installing all material and services required by the strictest condition noted on Drawings and/or in Specifications to ensure complete and operable systems as required by the Owner and Engineer.
C. All Core Cutting, Drilling, and Patching:
1. For the installation of work under this Section, the aforementioned shall be performed under this Section of the Specifications and the Concrete section of the Specifications.
2. No holes will be allowed in any structural members without the written approval of the Project’s Structural Engineer.
3. For penetrations of concrete slabs or concrete footings, the work shall be as directed in the Concrete Section of Specifications.
4. The Contractor shall be responsible for patching and repairing surfaces where he is required to penetrate for work under this contract.
5. Penetrations shall be sealed to meet the rated integrity of the surface required to be patched and repaired. The patched surface shall be painted or finished to match the existing surface.
D. Verifying Drawings and Job Conditions:
1. The Contractor shall examine all Drawings and Specifications in a manner to be fully cognizant of all work required under this Section.
2. The Contractor shall visit the site and verify existing conditions. Where existing conditions differ from Drawings, adjustment(s) shall be made and allowances included for all necessary equipment to complete all parts of the Drawings and Specifications.
1.04 WORK IN COOPERATION WITH OTHER TRADES
A. Examine the Drawings and Specifications and determine the work to be performed by the electrical, mechanical and other trades. Provide the type and amount of electrical materials and equipment necessary to place this work in proper operation, completely wired, tested and ready for use. This shall include all conduit, wire, disconnects, relays, and other devices for the required operation sequence of all electrical, mechanical and other systems or equipment.
B. Provide a conduit-only system for low voltage wiring required for control of mechanical and plumbing equipment described in this or other parts of the Contract Documents. Install all control housings, conduits, and backboxes required for installing conductors to the controls.
C. Install separate conduits between each heating, ventilating and air conditioning sensing device and its control panel and/or control motor. Before installing any conduit for heating, ventilating and air conditioning control wiring, verify the exact requirements from the control diagrams provided with the equipment manufacturer's shop drawings.
1.05 TESTING AND ADJUSTMENT
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 3
A. Upon completion of all electrical work, the Contractor shall test all circuits, switches, light fixtures, lighting control and dimming systems including distributed systems, UPSs, generators, SPDs, lighting inverters, transfer switches, motors, circuit breakers, motor starters and their auxiliary circuits and any other electrical items to ensure perfect operation of all electrical equipment.
B. Equipment and parts in need of correction and discovered during such testing, shall be immediately repaired or replaced with all new equipment and that part of the system shall then be retested. All such replacement or repair shall be done at no additional cost to the Owner.
C. All circuit(s) shall be tested for continuity and circuit integrity. Adjustments shall be made for circuits not complying with testing criteria.
D. All test reports, including copies of any required Energy Code Acceptance Forms (e.g. CA Title 24 Acceptance for Code Compliance Forms) should be submitted to the Engineer at completion of project.
1.06 IDENTIFICATION
A. Nameplates shall be provided for unit substations, switchgear, switchboards, distribution boards, distribution panels, panel boards, motor control centers, transformers, transfer switches, contactors, starters, disconnect switches, enclosed circuit breakers/switches, inverters, UPSs, PDUs, RDCs, SPDs, lighting control panels, dimming panels, door releasing system panels, fire alarm/central monitoring terminal cabinets/power supplies/control panels, and all low voltage system terminal and control cabinets.
1. Nameplate inscriptions shall be identical to the equipment designations indicated in plans and specifications. Nameplates shall be engraved with the device designation/identification on the top line, source identification for the device on the 2nd line per NEC, or CEC where adopted, Art 408.4 and load designation for the device on the bottom line. Where load designation consists of a branch circuit, omit bottom line. Where device designation is not indicated on plans/specifications, Contractor shall submit a written clarification request to the Engineer.
Example: Transformer 1TA
Source Disconnecting Location: Switchboard MSA located in Rm 110 Load: Panels 1LA and 1 LB
2. All circuit breakers/fuses in switchgear, switchboards, distribution boards, distribution panels, UPS output circuit breakers, PDU sub-feed circuit breakers and motor control centers shall have individual nameplates located immediately adjacent to the respective device. Nameplate inscription shall identify the downstream equipment or device served by the circuit breaker or fuse.
B. Identification nameplates, UON, shall be laminated/extruded modified acrylic that is 3/32 inches thick, UV-stabilized, matte finish, suitable for use in 180 deg. F ambient, with beveled edges and engraved white letters 3/8-inch-high, minimum, on 1-1/2-inch-high black background (utility/normal and optional standby power systems) for single line of text.
Where two lines of text are required, provide minimum 2-inch-high nameplate. Where three lines of text are required, provide minimum 2.5-inch-high nameplate. Provide white letters on red background for all NEC, or CEC where adopted, Article 517 essential power systems, Article 700 Emergency Systems, Article 701 Legally required standby systems and Article 708 COPS.
C. Identification nameplates for new switchgear, switchboards, distribution boards, distribution panels, panel boards and motor control centers shall be attached with switchgear manufacturer-provided screws via switchgear manufacturer factory pre-drilled holes. A factory option to rivet identification nameplates to the equipment is only acceptable if screwfastened nameplates are not an available option from the switchgear manufacturer. Field drilling or other mechanical attachment methods that change/void the NEMA or NTRL rating of the enclosure are strictly forbidden.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 4
D. Identification nameplates for transformers, transfer switches, disconnect switches, enclosed circuit breakers/switches, inverters, UPSs, PDUs, RDCs, SPDs, lighting control panels, dimming panels, door releasing system panels, terminal cabinets and all circuit breakers/fuses in switchgear, switchboards, distribution boards, distribution panels, UPS output circuit breakers, PDUs, PDU sub-feed circuit breakers, and motor control centers shall be attached to the equipment by self-adhesive backing integral to the nameplates.
When equipment is located outdoors, provide nameplates without self-adhesive backing and attach to equipment using weather-rated, UV-resistant epoxy. In all cases, clean surfaces before applying identification nameplates parallel to equipment lines.
E. Warning Placards, as required by General Single Line Diagram Notes for multiple power sources, or instruction placards, as required for all kirk-key interlock schemes, all UPS bypass procedures or as required elsewhere in the plans/specifications shall be engraved 1/2-inch-high white lettering on a red background using the same material specified for identification nameplates with a self-adhesive backing. Warning/instruction placards shall be attached to the face of the equipment directly related to the placards. Provide a formal placard submittal for review by the Engineer prior to ordering any warning/instruction placards. In all cases, clean surfaces before applying warning/instruction placards parallel to equipment lines.
F. Receptacles that are part of a UL-listed under floor computer room whip assembly, ceiling and/or cable/ladder tray-mounted receptacles used in lab, manufacturing, commercial kitchen environments or that are serving telecom/data/AV racks and cabinets shall have identification nameplates located on the wiring device plate cover. Nameplates shall be selfadhesive, 3/32-inch-thick Micarta with beveled edges, engraved 1/4-inch-high white lettering on black background with serving power source, circuit identification and NEMA/IEC receptacle type. Use of two (2) separate nameplates per device plate cover is acceptable.
Affix nameplates to be visible when plugs are occupying receptacles.
G. See wiring device section of this specification for wiring device plate cover labeling requirements.
H. See drawings for panel board schedule directory installation requirements.
I. See conduit installation section of this specification for conduit labeling requirements.
1.07 FINAL INSPECTION AND ACCEPTANCE
A. After all requirements of the Specifications and/or the Drawings have been fully completed; representatives of the Owner will inspect the work. Contractor shall provide competent personnel to demonstrate the operation of any item or system to the full satisfaction of each representative.
B. Final acceptance of the work will be made by the Owner after receipt of approval and recommendation of acceptance from each representative.
1.08 RECORD DRAWINGS
A. Drawings of Record: The Contractor shall provide and keep up-to-date, a complete record set of drawings. These shall be corrected daily and show every change from the original Drawings. This set of prints shall be kept on the job site and shall be used only as a record set. This shall not be construed as authorization for the Contractor to make changes in the layout without definite instruction in each case. Upon completion of the work, a set of reproducible Contract Drawings shall be obtained from the General Contractor and all changes as noted on the record set of prints shall be incorporated thereon with black ink in a neat, legible, understandable and professional manner. Refer to the Supplementary General Conditions for complete requirements.
1.09 MAINTENANCE, SERVICING, INSTRUCTION MANUALS AND WIRING DIAGRAMS For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 5
A. Prior to final acceptance of the job, the Electrical Contractor shall furnish to the Owner at least four (4) copies of operating, maintenance, and servicing instructions, as well as four (4) complete wiring diagrams.
B. All wiring diagrams shall specifically cover the system supplied. Typical drawings will not be accepted. Four (4) copies shall be presented to the Owner.
1.10 INTERRUPTION OF SERVICE/SERVICE SHUTDOWN
A. Any interruption of electrical services, electrical circuits, electrical feeders, signal systems, communication systems, fire alarm systems, etc. required to perform work, shall meet the specific prior-approval requirements of the Owner. Such work shall be scheduled with the Owner to be performed at the Owner's convenience.
B. Interruptions/outages of any of the Owner’s systems and services mentioned above shall be scheduled to occur during other than the Owner’s normal business hours. Any overtime costs shall be borne by the Contractor.
C. See drawings for any additional requirements regarding outages, interruption and any temporary services required.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Materials and Equipment: All electrical materials and equipment, including custom-made equipment, shall be new and shall be listed by Underwriter's Laboratories (UL) and bear their label or be listed and certified by a Nationally Recognized Testing Lab (NRTL) that is also recognized by the local Authority-Having-Jurisdiction (AHJ) B. Switchgear/Switchboards/Distribution Boards/Motor Control Centers:
1. See general single line notes on single line drawing for more information.
C. Panel boards – Branch Circuit:
1. See drawings for panel board schedules and specifications.
D. Transformers:
1. See drawings for transformer schedules and specifications.
E. Lighting Fixtures:
1. See drawings for lighting fixture and lamp schedules and additional specifications.
Furnish, install and connect a lighting fixture at each outlet where a lighting fixture type symbol (designated on plans) is shown as being installed. Each fixture shall be complete with all required accessories including sockets, glassware, boxes, spacers, mounting devices, fire rating enclosure and lamps.
2. Ballasts: See lighting fixture schedule notes. All noisy ballasts shall be replaced at no cost to the Owner.
3. Lamps: See lamp/fixture schedule and lamp/lighting fixture schedule notes.
F. Wiring Devices:
1. Provide wiring devices indicated per plan. Devices shall be specification grade.
Acceptable manufacturers are Leviton, Pass and Seymour and Hubbell. Provide all similar devices of same manufacturer, unless indicated otherwise. All device colors shall be from the full range of manufacturer standard color options as selected by the Architect. This selection will be made during the shop drawing review process a. Use of dedicated receptacles is required where plans depict a branch circuit supplying only a single simplex or duplex receptacle. Use of controlled receptacles is required where depicted on plans - see controlled receptacle specifications for additional information.
2. I.G. (isolated ground) receptacle bodies shall be of a basic color specified above with an orange triangle to symbolize isolated ground.
3. H.G. (hospital grade) receptacle bodies shall be of a basic color specified above with a green circle to symbolize hospital grade.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 6
4. When shown circuited with an I.G. conductor, receptacles shall be of an I.G. type.
As an example, a NEMA L6-30R denoted on the plans and shown circuited with an I.G. conductor shall be an I.G. version of that receptacle.
5. Wiring devices located in wood finished areas shall generally be black unless otherwise indicated by the Architect.
6. Wiring devices located in mirrors shall generally be white with stainless steel cover plates unless otherwise indicated by the Architect.
7. In addition to other device requirements listed elsewhere in this specification, 125V (Volt), 15A (Amp) and 20A Tamper-Resistant wiring devices shall be provided as follows:
a. In wet and/or exterior locations.
8. Wiring device cover plates located on recessed boxes shall be commercial grade nylon. Plate color shall match wiring device color UON on plans. Cover plates utilized on surface mounted boxes shall be metal. Plastic cover plates are unacceptable.
9. Except as otherwise noted, all wiring device plates on the project shall be labeled with panel and circuit number(s) utilizing a Brother P-Touch labeling system with 1/2-inch tape (yellow on black) or equal by Herman-Tellerman or Panduit. Locate label on the concealed side of the wiring device plate. Handwritten labels are unacceptable.
10. The Contractor shall provide duplex receptacle outlets in the appropriate configurations necessary to comply with applicable energy code requirements for controlled receptacles and as shown on plans. All wiring devices indicated to be controlled receptacles shall be NEMA-approved, electrical code-compliant with factory markings on the face of the receptacle(s) with the word "Controlled" or utilize further markings and symbols to indicate which receptacles on each outlet is/are controlled. Stickers, field-applied markings or other non-permanent markings are not acceptable. Where a GFCI receptacle outlet is required to be controlled, provide an adjacent controlled duplex receptacle outlet connected on the load side of the GFCI outlet. Generally, one receptacle in a duplex receptacle outlet is required to be controlled. It may be the lower receptacle or upper receptacle based on manufacturer offering. However, the controlled receptacle location within a controlled receptacle outlet shall remain consistent throughout the project. Where an existing duplex receptacle outlet is required to be controlled, provide a new wiring device with the appropriate control configuration necessary to comply with plans. All controlled receptacles shall be connected to a branch circuit controlled by an occupancy sensor-based or relay panel lighting control system. Acceptable manufacturers are Leviton, Pass and Seymour and Hubbell.
11. The following wiring device plates shall have custom engraving:
a. Key operated switches, switches with pilot lights, and switches for the control of motors, heaters and ventilators. Engraving shall be black and occur on the exposed side of the plate indicating the motor, heater, or ventilator controlled.
b. Receptacles on optional standby generator and/or UPS power shall have custom engraved plates with the words "Generator" or "UPS" in black letters. In addition, where located in telecommunications closets, IDFs, server rooms, data centers, labs (wet, dry or electronic) indicate panel board and circuit number.
c. For Health Care Facilities, provide custom engraved device cover plates, for all devices, indicating panel board and circuit number. Devices served by normal/utility power circuits shall have black lettering. Devices served by essential electrical system power circuits shall have red lettering.
d. All stainless steel and nylon device plates shall be engraved using a rotary engraving process except for black lettering on stainless steel For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 7
device plates which may be accomplished via laser etching process. All lettering shall be 3/16 inch high. Provide a dimensioned submittal drawing detailing a typical device faceplate with engraving.
G. Weatherproof Outlet Covers/Assemblies: All Receptacles identified as weatherproof on the drawings shall be weather-resistant, tamper-resistant, GFCI type and equipped as follows:
H. Circuit Breakers:
1. Service entrance circuit breakers smaller than 400A (Amp) frame shall be thermalmagnetic trip with inverse time current characteristics unless otherwise indicated below. Service entrance main circuit breakers and main circuit breakers. 400A frame and larger shall be 100 percent rated, solid-state type as outlined in this specification. All other service entrance circuit breakers, 400A frame and larger, shall be 100 percent rated, solid-state type as outlined in this specification.
2. All non-service entrance circuit breakers 225A and larger shall be thermal magnetic type and have continuously adjustable instantaneous pick-ups of approximately 5 to 10 times trip rating. Breakers shall have either tamper-resistant rating dials or easily changed trip rating plugs with trip ratings as indicated on the Drawings. Rating plugs shall be interlocked so they are not interchangeable between frames.
Additionally, all non-service entrance circuit breakers, 600A frame and larger, located in 480V, 3-phase, 3-wire or 277/480V, 3-phase, 4-wire switchgear, distribution boards, panel boards or busway plugs shall be solid state, 100 percent rated. Breaker shall have built-in test points for testing long delay, short delay and instantaneous, and ground fault (where shown) functions of the breaker by means of a 120V operated test kit. Contractor shall utilize a test kit capable of testing all breakers 400A and above - at the Engineer’s request.
3. All non-service entrance circuit breakers less than 225A shall be molded plastic case, air circuit breakers conforming to UL 489. Provide breakers with thermal magnetic trip units, and a common trip bar for two- or three-pole breakers, connected internally to each pole so tripping of one pole will automatically trip all poles of each breaker. Provide breakers of trip-free and trip-indicating bolt-on type, with quick-make, quick-break contacts. Provide single two- or three-pole breaker interchangeability. Provide padlocking device for circuit breakers as shown on the Drawings.
4. Where a Current Limiting Circuit Breaker (CLCB) is indicated on drawings or as required elsewhere in this specification, provide a UL listed current limiting thermal magnetic circuit breaker(s) UON. An independently operating limiter section within a molded case is not allowed. Coordinate CLCB ratings as required to protect electrical system components on the load side of the CLCB to include, but not limited to, protecting automatic transfer switches, panel boards and lighting control panels.
5. Where a solid-state circuit breaker is indicated on drawings or as required elsewhere in this specification, provide a solid-state circuit breaker with minimum five function complete with built-in current transformers. The five functions shall be independently adjustable and consist of Overload/Long Time Amp Rating, Long Time Delay, Short Time Delay, Short Circuit/Instantaneous Pickup, but may also include Shunt Trip and/or Ground Fault if so indicated on the Drawings. Rating plugs shall be interlocked so they are not interchangeable between frames. Breaker shall have built-in test points for testing long delay and instantaneous, and ground fault (where shown) functions of the breaker by means of a 120V operated test kit.
Contractor shall utilize a test kit capable of testing all breakers 400A and above, at the Engineer’s request.
6. Circuit breakers, 1200A Frame or larger, or circuit breakers with sensors or adjustable trip settings, 1200A or larger, shall be equipped with an Energy Reducing Maintenance Switch that complies with NEC, or CEC where adopted, 240.87 (B) (3) For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 8
unless specified elsewhere with an alternate arc energy reduction method allowed by this same code section.
7. Ground Fault Interrupting Breakers: Provide with molded plastic case, air circuit breakers, similar to above with ground fault circuit interrupt capability, conforming to UL Class A, Group 1.
8. Arc Fault Interrupting Breakers: Provide with molded plastic case, air circuit breakers, similar to above with arc fault circuit interrupt capability, conforming to UL 1699. Provide on all dwelling-unit circuits supplying bedrooms, sleeping quarters etc. as required to comply with NEC, or CEC where adopted, Article 210.12.
9. Tandem or half-sized circuit breakers are not permitted.
10. Series-Rated Breakers: UL listed series-rated combinations of breakers can be used to obtain panelboard-interrupting ratings shown on Drawings. If series-rated breakers are used, switchboards, distribution boards, and panel boards shall be appropriately labeled to indicate the use of series-rated breakers. Shop drawing submittal shall include chart of UL listed devices, which coordinate to provide series rating.
11. Circuit breakers shall be standard interrupting construction. Panelboard shall accept standard circuit breakers up to 100A.
12. Circuit breaker handle accessories shall provide provisions for locking handle in the on or off position.
13. Shunt-trip equipped circuit breakers shall be provided on all elevator feeders.
14. Temperature compensating circuit breaker(s) shall be provided when located in outdoor enclosure(s) or when located in an enclosure subject to high ambient heat due to due nearby industrial processes, etc.
15. Provide 75 degree Celsius-rated conductor lugs/lug kits as required on all circuit breakers to accept conductor quantities and sizes shown on drawings.
16. All circuit breaker terminations shall be suitable for use with 75-degree Celsius ampacity conductors. Listed, dual-rated pin terminals, straight or offset, are acceptable for use to in accommodating oversized or parallel conductor installations.
17. Circuit breakers serving Fire Alarm or Central Monitoring panels and power supplies shall be red in color and lockable in the “ON” position.
I. Disconnect Switches:
1. Non-fusible or fusible, heavy-duty, externally-operated horsepower-rated, 600V A.C:
Provide NEMA 3R, lockable enclosures for all switches located on rooftops, in wet or damp areas and in any area exposed to the elements.
2. Fusible switches shall be Class “R” when 600A or less or Class “L” when greater than 600A.
3. Amperage, Horsepower, Voltage and number of poles per drawings: All shall be clearly marked on the switch nameplate.
4. Provide the Owner’s project manager with one (1) spare set of fuses and two (2) sets of fuse clips/fuses for every set of fuses on the project.
J. Fuses:
1. Provide fuses at all locations shown on the Drawings and as required for supplemental protection:
a. Fuses shall be manufactured by Bussman, Shawmut, or equal. b. All fuses shall be the product of a single manufacturer.
2. Main and Feeder Protection:
a. Protective devices rated greater than 600A: Provide Bussman Hi-Cap fuses, Class L, current limiting, having an interrupting rating of 200,000A RMS.
b. Protective devices rated 600A or less: Provide Bussman Class R fuses, Class RK series current limiting fuses, having an interrupting rating of 200,000A RMS.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 9
3. Motor Protection:
a. Where rating of protective device is greater than 600A, provide Bussman Hi-Cap fuses, Class L, current limiting, having an interrupting rating of 200,000A RMS.
b. Where rating of protective device is 600A or less, provide Bussman Class RK series current limiting fuses, having an interrupting rating of 200,000A RMS.
c. Where fuses feeding motors are indicated, but not sized, it shall be the responsibility of the Contractor to coordinate the fuse size with the motor to provide proper motor running protection.
d. When rejection type fuses are specified (Class RK series) the fuse holder of all switches (specified in other Sections) shall be suitable for the fuses provided.
K. Uninterruptible Power Systems (UPS):
1. See drawings for UPS schedules and specifications.
L. Power Distribution Units (PDU):
1. See drawings for PDU schedules and specifications.
M. Generator Systems:
1. See drawings for Generator schedules and specifications.
N. Transfer Switches:
1. See drawings for Transfer Switch schedules and specifications.
O. Conduit:
1. Galvanized Rigid Conduit (GRC) shall be full weight threaded type steel. Steel conduit shall be protected by overall zinc coating to inside and outside surfaces, applied by the hot dip, metalizing, or sherardizing process.
2. Intermediate Metal Conduit (IMC), shall be hot-dipped galvanized in accordance with UL 1242, and meet Federal Specification WWC-581 (latest revision).
3. Electrical Metallic Tubing (EMT) shall be zinc-coated steel with baked enamel or plastic finish on inside surfaces. EMT shall be dipped in a chromic acid bath to chemically form a corrosion-resistant protective coating of zinc chromate over galvanized surface.
4. Flexible metal conduit shall be constructed of aluminum or hot-dipped galvanized steel strips wound spirally with interlocking edges to provide greatest flexibility with maximum strength. Interior surfaces shall be smooth and offer minimum drag to pulling in conductors. Use only as directed in writing by the Engineer with the exception of 400 Hz feeders and 400 Hz branch circuits which shall be run in flexible aluminum conduit.
5. Liquid-tight conduit (Seal-Tite) shall be galvanized steel flexible conduit as above except with moisture and oil-proof jacket, pre-cut lengths and factory-installed fittings. For outdoor installations and motor connections only unless otherwise noted on drawings.
6. Factory assembled, or off-site assembled wiring systems (such as Metal Clad (MC) Cable, Type AC Cable, Type NM Cable, Type BX Cable, etc.) shall not be used unless otherwise indicated in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section generally located on the symbols list drawing.
7. When approved for use in the Allowed Specification Deviations Section, generally located on the symbols list drawing, MC cables shall be allowed for lighting branch circuits (homeruns shall be EMT), receptacle branch circuits (homeruns shall be EMT) and poke-thru fed systems furniture homeruns. MC shall not be used where exposed, except for a maximum 6-foot length for final connections to light fixtures, or terminate in electrical panelboards or distribution boards. Equipment ground conductor shall be green. Isolated ground conductor shall be green with yellow For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 10
stripe. Provide 600V rated aluminum or lightweight steel interlocking armor Metal Clad (MC) cable with copper conductors, THHN (90-degree C) insulation, and integral equipment grounding conductor and isolated grounding conductor as required. Type AC cable listed for use in patient care areas for non-essential electrical system branch circuits per NEC or CEC where adopted, Article 517.13 shall be required in such areas in lieu of MC cable. Type AC and MC cable shall not be used for essential electrical system branch circuits. MC cable shall be manufactured to Underwriter Laboratory Standard 1569. See PART 3 - EXECUTION section of this specification for additional installation requirements.
8. Nonmetallic Flexible Tubing (ENT) shall not be used unless otherwise indicated in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section generally located on the symbols list drawing. Use of ENT, if allowed, is strictly limited to use in CMU walls and parking structures decks or as directed in writing by the Engineer. See PART 3 - EXECUTION section in this specification for additional installation requirements.
9. Non-Metallic Conduit:
a. Polyvinyl chloride (PVC) rigid conduit, Schedule 40, Type II for underground installation only with solvent welded joints, conforming to Underwriters Laboratories, Inc. (UL) requirements, listed for exposed and direct burial application.
b. Conduit and fittings shall be produced by the same manufacturer.
10. Fire-rated MC Cable:
a. 2-hour fire-rated, polymer insulated 600V MC cable listed and conforming to Underwriters Laboratories, Inc. (UL) 2196 and UL 1569 requirements for installation as an Electrical Circuit Protective System for use in complying with NEC, or CEC where adopted, Articles 695 and 700. Where adopted, cable sheath shall be suitable for use as a NEC or CEC equipment grounding conductor, and shall be listed for use in wet locations to 90 degrees C (Raychem or equal).
b. Cable connectors shall be brass MC connectors.
P. Fittings:
1. Condulet type fittings shall be smooth inside and out, taper threaded with integral insulating bushing and of the shapes, sizes and types required to facilitate installation or removal of wires and cables from the conduit and tubing system.
These fittings shall be of metal, smooth inside and out, thoroughly galvanized, and sherardized cadmium plated.
2. Metallic condulet covers shall have the same finish as the fitting and shall be provided for the opening of each fitting where conductors do not pass through the cover.
3. Connector, coupling, locknut, bushings and caps used with rigid conduit shall be steel, threaded and thoroughly galvanized. Bushings shall be insulated.
4. UON all EMT fittings, connectors and couplings installed in concealed locations, areas not considered to be wet or damp locations by the AHJ, or areas not subject to physical damage, shall be steel, zinc or cadmium plated, threadless, compression, steel locking ring type with insulated throat. Where suitable for use, steel set screw fittings are allowed for trades sizes of 2 inches and smaller.
Insulated throat is not required for fittings, connectors and couplings 1 inch and smaller.
5. All interior and exterior EMT fittings, connectors and couplings, 2 inches and smaller, installed in exposed or concealed locations that are considered by the AHJ to be wet or damp locations, shall be Raintite-listed, steel, zinc or cadmium plated, threadless, compression, steel locking ring type with insulated throat. If Raintitelisted, EMT fittings, connectors and couplings are unavailable for a given trade size For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 11
or if conduit is installed in an area subject to damage – provide rigid metallic or intermediate metallic conduits, fittings, connectors and couplings as required.
6. Flexible steel conduit connectors shall be a malleable iron clamp or squeeze type or steel twist-in type with insulated throat. The finish shall be zinc or cadmium plating.
7. Conduit unions shall be "Erickson" couplings, or approved equal. The use of running threads will not be permitted.
Q. 600 Volt Conductors - Wire and Cable:
1. All conductors shall be copper. Provide stranded conductor for #10 AWG and larger or when making flexible connections to vibrating machinery. Use compression "fork" type connectors or transition to solid conductors when connecting to switches, receptacles, etc.
2. Type THHN/THWN-2 thermoplastic, 600 volts, UL approved, dry and wet locations rated at 90 degrees Celsius, for conductors of all sizes from #12 AWG up to and including 1000 kcmil. RHH/RHW insulation is allowed only to provide an Electrical Circuit Protective System to comply with NEC, or CEC where adopted, Articles 695 and 700.
3. Wire and cable shall be new, manufactured not more than six (6) months prior to installation, shall have size, type of insulation, voltage rating and manufacturer's name permanently marked on outer covering at regular intervals.
4. Wire and cable shall be factory color-coded by integral pigmentation with a separate color for each phase and neutral. Each system shall be color-coded and it shall be maintained throughout.
5. Systems Conductor Color Coding:
a. Power 208/120V, 3PH, 4W:
1) Phase A = Black
2) Phase B = Red
3) Phase C = Blue
4) Neutral = White or White with Phase Color Tracer
5) Switch legs = Purple (Switch legs shall also be identified separately by numerical tags).
6) Travelers = Purple with Black stripe or Pink.
b. Power 480/277V, 3PH, 4W:
1) Phase A = Orange
2) Phase C = Yellow
3) Neutral = Grey or Grey with Phase Color Tracer
4) Switch legs = Purple (Switch legs shall also be identified separately by numerical tags).
5) Travelers = Purple with black stripe or Pink.
c. Ground Conductors: Green
d. Isolated Ground Conductors: Green with continuous yellow stripe. e. Fire Alarm System: As recommended by the manufacturer.
6. All color-coding for #12 through #6 AWG conductor shall be as identified above.
Conductors #4 AWG and larger shall be identified with utilizing phase tape at each termination.
7. No conductors carrying 120V or more shall be smaller than #12 AWG.
8. Aluminum conductors shall not be used.
9. Wire-pulling compounds used as lubricants in installing conductors in raceways shall only be "Polywater J". No oil, grease, graphite, or similar substances may be used. Pulling of #1/0 or larger conductors shall be done with an approved cable pull machine. Other methods; e.g. using vehicles and block and tackle to install conductors are not acceptable.
R. Medium Voltage Conductors (greater than 600V):
1. See drawings for Medium Voltage Cable Schedule and Specifications.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 12
S. Junction and Pullboxes:
1. For interior dry locations, boxes shall be NEMA 1 galvanized one-piece drawn steel, knockout type, with removable, machine screw secured covers.
2. For outside, damp or surface locations, boxes shall be NEMA 3R heavy cast aluminum or cast iron with removable, gasketed, non-ferrous machine screw secured covers.
3. For in-grade applications, junction and pull boxes shall be pre-cast concrete or molded fiberglass manufactured by Christy, Brooks-Jensen, or Utility Vault Co.
Fiberglass boxes shall:
a. Be used only in landscape planter areas that are not subject to damage from lawnmowers, tractors and other machinery.
b. Not be used in lawn or turf areas.
c. Not exceed 11 inches W x 17 inches L in size unless required to be larger to meet code requirements.
4. All boxes shall be sized for the number and sizes of conductors and conduits entering the box and equipped with plaster rings where required.
5. All boxes located in traffic areas shall be traffic rated.
T. Outlet Boxes:
1. For fixtures, boxes shall be galvanized, one-piece drawn steel, knockout type equipped with 3/8-inch fixture studs and plaster rings where required.
2. For convenience outlets, wall switches, or other devices, outlet boxes shall be galvanized one-piece drawn steel, knockout type 4-inch x 4-inch x 2-1/8-inch minimum size with plaster rings as required.
3. For locations where standard boxes are not suitable due to number and size of conduit to be terminated, special boxes shall be designed to fit space or meet other requirements, and submitted for approval.
4. For exposure to weather, damp locations, or surface mounting, outlet boxes shall be heavy cast aluminum or cast iron with threaded hubs; covers shall be watertight with gaskets and non-ferrous screws.
5. Outlet boxes used for support of ceiling fans shall be galvanized, one-piece drawn steel, knockout type equipped with bracing bars and plaster rings where required and listed for ceiling fan support use. Such boxes shall be labeled and capable of supporting ceiling fan weights up to 70 pounds.
6. See drawings for floor box installation notes and specifications.
U. Plywood Backboards: Where indicated for telephone or communications system terminals or other equipment assemblies, provide backboards of size indicated. Use 3/4-inch-thick x 8 foot all (length per plans), Douglas Fir, void-free, kiln-dried, fire-rated plywood finished on one side and prime coat painted on all surfaces with finish coat of enamel paint, color by Architect. Leave one (1) fire-rating stamp/sheet exposed for inspection.
V. Terminal Cabinets:
1. Terminal cabinets shall be fabricated of hot dipped galvanized code gauge sheet metal for flush or surface mounting, complete with barriered sections, a door for each vertically barriered section and sizes as indicated on plan. Doors shall be hinged and lockable. Locks shall be keyed to match the branch circuit panelboards.
Terminal cabinet trims shall match the branch circuit panels.
2. Provide each terminal cabinet with a full size mounting backplate.
3. Terminal cabinets shall be installed complete with full-length skirts of the same construction and finish as the terminal cabinet.
4. Where mounted outdoors, terminal cabinets shall be NEMA 3R, weatherproof complete with gaskets and required sealant to prevent moisture from entering the terminal cabinet.
5. All terminal cabinets and terminal cabinet barriered sections shall be labeled by the cabinet or cabinet section use (i.e. CATV, Security, etc.). Labels shall be Micarta For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 13
type as specified elsewhere in these specifications. Unless otherwise noted, all termination blocks and cables shall be labeled per ANSI/EIA 606 standard.
W. Painting: Terminal cabinets, panels, junction boxes, pull boxes, etc., and conduit installed in public view shall be painted with colors selected by the Architect to match the subject surfaces. Refer to painting section of the specifications for additional requirements.
X. Seismic Design, Certification and Anchoring of Electrical Equipment:
1. Contractor shall include all costs in the base bid for labor, materials, all special inspections and structural engineering design necessary to meet the Seismic Design Requirements for Non-structural Components (Chapter 13, ACE SEI 7-05 Minimum Design loads for Buildings and Other Structures) as required by IBC, or CBC where adopted, Section 1708 and as related to the installation all electrical equipment furnished under this contract. See Specific Project Site Seismic Criteria on architectural and/or structural plans which include Building Occupancy Category, Seismic Design Category, Design Spectral Response Acceleration (SDS), Height factor ratio (z/h) and Site Class. Non-structural Component Importance Factor (IP) for a particular component shall be determined based on the following criteria:
a. IP = 1.0: Non-life safety, Non-structural Components in an Occupancy Category IV Facility not required for continued operations of the facility or in any other Occupancy Category Facility where component failure will not impair continued operation of the facility.
b. IP=1.5: Designated Seismic Systems are those non-structural components in any Occupancy Category IV facility (except as noted above) or that are a part of any code-defined Critical, Life Safety, Emergency and Legally Required Standby Electrical System.
Additionally, those non-structural components containing hazardous materials shall be classified as Designated Seismic Systems. While Designated Seismic Systems are generally identified on the plans, they may include items such as generators, automatic transfer switches, UPS units and all associated electrical distribution equipment and components necessary for the designated seismic system to form a complete and operable system. The Contractor shall ultimately be responsible for identifying Designated Seismic Systems. For any electrical component either identified on the plans or determined by the contractor to be a Designated Seismic System, all line and load side electrical distribution systems supporting that Designated Seismic System (including, but not limited to, feeders, panel boards switchboards, transformers, all related component supports and attachments etc.) shall be considered a part of the designated seismic system for the purposes of code-compliance and seismic certification.
c. z/h - Height factor ratio: See plans for respective equipment locations.
2. Provide a delegated-design submittal for each of the following seismic-restraint systems to be used as required:
a. Restraint Channel Bracings consisting of MFMA-4, shop-or fieldfabricated bracing assembly made of slotted steel channels with accessories for attachment to braced component at one end and to building structure at the other end, with other matching components, and with corrosion-resistant coating; rated in tension, compression, and torsion forces.
b. Restraint Cables consisting of ASTM A 603 galvanized-steel cables.
End connections made of steel assemblies with thimbles, brackets, swivel, and bolts designed for restraining cable service, with a minimum of two clamping bolts for cable engagement.
c. Seismic-Restraint Accessories consisting of hanger rod/hanger rod stiffener assemblies, multifunctional steel connectors for attaching For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 14
hangers to rigid channel bracings and/or restraint cables, bushings for floor and wall-mounted equipment anchor bolts and resilient isolation washers and bushings.
d. Mechanical Anchor Bolts consisting of drilled-in and stud-wedge or female-wedge type in zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E 488. e. Adhesive Anchor Bolts consisting of drilled-in and capsule anchor system containing resin and accelerator, or injected polymer or hybrid mortar adhesive. Provide specific LEED-compatible environmentallyfriendly resins and adhesives on all LEED projects. Provide anchor bolts and hardware with zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E 488.
3. Submittal shall include design calculations and details for selecting seismic restraints complying with performance requirements, design criteria, and analysis data signed and sealed by the contractor's structural engineer responsible for their preparation. Calculations shall include, but not be limited to, static and dynamic loading caused by equipment weight, operation, and seismic and, if applicable, wind forces required to select seismic and, if applicable, wind restraints and for designing vibration isolation bases. Provide seismic and wind-restraint detailing to support system selection, arrangement of restraints, attachment locations, methods, and spacings with all components identified to include their strengths, directions and values of forces transmitted to the structure during seismic events and association with vibration isolation devices. Sizes of components shall be selected so strength will be adequate to carry present static and seismic loads to accommodate 25 percent spare future capacity within specified loading limits.
4. Any pre-approval and evaluation documentation shall have a California Office of Statewide Health Planning and Development (OSHPD) Special Seismic Certification Preapproval (OSP) demonstrating horizontal and vertical load testing and analysis showing maximum seismic-restraint ratings, by ICC-ES or another agency acceptable to authorities having jurisdiction. Ratings based on independent testing are preferred to ratings based on calculations. If preapproved ratings are not available, submittals based on independent testing are preferred. Calculations (including combining shear and tensile loads) that support seismic-restraint designs must be signed and sealed by a qualified professional engineer.
5. Coordinate the location of embedded connection hardware with supported equipment attachment and mounting points and with requirements for concrete reinforcement and formwork specified elsewhere in the project specifications.
6. Install flexible connections in runs of raceways, cables, wireways, cable trays, and busways where they cross seismic joints, where adjacent sections or branches are supported by different structural elements, and where connection is terminated to equipment that is anchored to a different structural element from the one supporting them as they approach equipment. Flexible connection limitations of the NEC, or CEC where adopted, shall apply.
7. Install seismic-restraint devices using methods approved by OSHPD or an agency acceptable to authorities having jurisdiction providing required submittals for component.
8. Multiple Raceways or Cables: Secure raceways and cables to trapeze member with clamps approved for application by OSHPD or an agency acceptable to authorities having jurisdiction.
9. The contractor shall engage a qualified testing agency to perform tests and inspections as listed in other Project Specifications, but as a minimum shall include at least four of each type and size of installed anchors and fasteners selected by Architect. Schedule tests with Owner, through Architect, before connecting For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 15
anchorage device to restrained component (unless post connection testing has been approved), and with at least seven days' advance notice. Obtain Architect's approval before transmitting test loads to structure. Provide temporary loadspreading members as required. Test to 90 percent of rated proof load of device.
Prepare and submit test and inspections reports.
Y. Trenching and Backfilling: Contractor shall be responsible for trenching and backfilling. Refer to Trenching and Backfilling section of the specifications for complete requirements.
PART 3 - EXECUTION
3.01 PREPARATION AND INSTALLATION
A. Installation of Conduit and Outlet Boxes:
1. All conduit installed in the dry walls or ceilings of a building shall be steel tube (EMT), aluminum tube (EMT), or Intermediate Metal Conduit (IMC). Flexible conduit shall not be used in lieu of EMT, IMC or rigid conduit except as noted herein.
2. Galvanized rigid conduit (GRC) or intermediate metal conduit (IMC) shall be used as follows:
a. When noted on the drawings.
b. When considered exposed to damage by the local AHJ.
c. When installed in wet or damp locations and of a trade size where listedRaintite fittings, connectors, couplings etc. are unavailable. d. When required by NEC or CEC Article 517.13.
e. When installed in concrete and masonry. The use of ENT in CMU walls and parking structures may be allowed only as directed in writing by the Engineer. Request for ENT substitution must be made prior to bid and in accordance with pre-bid substitution requests requirements of these specifications.
3. Intermediate metal conduit (IMC), is approved for use in all locations as approved for GRC or steel-tube EMT and in accordance with NEC, or CEC where adopted, Article 342.
4. Flexible steel conduit shall only be permitted to be used at light fixture outlets and connections to vibrating electrical equipment. Except when concealed in walls or other structural elements, all flexible steel conduit runs shall be less than 6'-0". All outdoor installation shall be made using liquid-tight flex with approved fittings.
Include a separate insulated green ground conductor sized per NEC in each conduit. Other uses of flexible conduit shall be allowed only as approved in writing by the Engineer.
5. Flexible liquidtight conduit shall be installed in lieu of the flexible steel; where required by the NEC, or CEC where adopted, in damp and wet location, where exposed to weather, in refrigerated area (65°F or less), and/or between seismic joints. All rotating electrical equipment shall be supplied with flexible, liquid-tight conduit with appropriate slack and shall not exceed thirty-six (36) inches. Include a separate insulated green ground conductor sized per NEC in each conduit. Other uses of liquidtight flexible conduit shall be allowed as approved in writing by the Engineer on a case by case basis.
6. Rigid metallic conduit installed underground or embedded in concrete shall be 1- inch trade size minimum and shall be wrapped with 20 mil. Polyvinylchloride plastic tape, PVC conduit installed underground or embedded in concrete shall be 3/4-inch minimum trade size.
7. Where required for providing an electrical circuit protective system to comply with NEC, or CEC where adopted, Articles 695 and 700 utilize UL Listed 2-hour firerated, MC cable or UL Listed 2-hour fire-rated RHH/RHW conductors in conduit.
8. Conduit shall be run so as not to interfere with other piping fixtures or equipment.
9. The ends of all conduit shall be cut square, carefully reamed out to full size and shall be shouldered in fitting.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 16
10. No running threads will be permitted in locations exposed to the weather, in concrete or underground. Special union fittings shall be used in these locations.
11. Where conduit is underground, under slabs or grade, exposed to the weather, or in wet locations, make joints liquid tight and gas tight.
12. All metal conduit in masonry and concrete and where concealed under floor slabs shall have joints painted with thread compound prior to makeup.
13. PVC conduit shall not be run in walls except where approved by the Engineer prior to bid in limited instances that may include concrete or CMU walls used in site retaining, parking structures, or exterior equipment yard or enclosure walls, etc.
14. Where conductors enter a raceway or a raceway in a cabinet, pull box, junction box, or auxiliary gutter, the conductors shall be protected by a plastic bushing type fitting providing a smoothly rounded insulating surface.
15. Where conduit extends through roof to equipment on roof area, the Contractor shall provide flashing material compatible with the roofing system as required by the roofing specifications or as required by the Owner’s roof warranty. This flashing shall be delivered to the roofing Contractor for installation. The actual location of all such roof penetrations and outlets shall be verified by the Architect/Owner.
Contractor to verify type of flashing prior to bid and include all costs.
16. All conduit shall be supported at intervals not less than 6'-0" and within 12 inches from any outlet and at each side of bends and elbows. Conduit supports shall be galvanized, heavy stamped, two-hole conduit clamp properly secured.
17. Where conduit racks are used the rack shall consist of two-piece conduit clamps attached to galvanized steel slotted channels, properly secured via threaded rods attached directly to the building structure.
18. Nail-in conduit supports, one-piece set screw type conduit clamps or perforated iron for supporting conduit shall not be used.
19. Seismic Conduit Support:
a. All conduit shall be supported in such a manner that it is securely attached to the structure of the building. Attachment is to be capable of supporting the tributary weight of conduit and contents in any direction.
Maximum spacing of support and braces are to be as follows:
CONDUIT SIZE MAXIMUM SPACING
1/2" to 3" 6'-0"
3-1/2" to 4" 8'-0"
20. All conduit runs shall be installed parallel or perpendicular to walls, structural members, or intersection of vertical planes and ceilings. Field made bends and offset shall be avoided where possible. Crushed or deformed raceway shall not be installed.
21. Open knockouts in outlet boxes only where required for inserting conduit.
22. Locate wall outlet of the same type at same level in all rooms, except where otherwise noted.
23. Outlet boxes on metal studs shall be attached to metal hangers, tack welded or screwed to studs; on wood studs attachment shall be with wood screws, nails are not acceptable.
24. Recessed boxes shall not be mounted back-to-back in any wall; minimum offset shall be 24 inches.
25. Junction Boxes that do not contain any device(s) shall be located in storage rooms, electrical closets, or above accessible ceilings, not in hard lid ceilings or other forms of inaccessible ceilings. Place boxes which must be exposed to public view in a location approved by the Owner’s Project Manager. Provide covers or plates to match adjacent surfaces as approved by the Owner’s Project manager.
26. Surface mounted pull boxes, terminal cabinets, junction boxes, panel boards etc., shall be attached to walls using appropriate screws, fasteners, backing plates, stud blocking etc., as detailed on architectural and/or structural drawings. If architectural and/or structural drawings are not provided on the project, Contractor shall provide For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 17
all necessary mounting hardware and backing support to comply with local building code requirements and any additional requirements imposed by the local AuthorityHaving-Jurisdiction
27. Sleeves shall be installed where conduit passes through masonry or concrete walls and shall be 24-gauge galvanized steel no more than 1/2 inch greater in diameter than the outside diameter of the conduit. When located in non-rated structures, caulk conduit sleeve with stone wool and waterproof below grade. When located in fire rated structures, provide UL listed fire stopping system. See fire stopping section of this specification for additional requirements.
28. All boxes shall be covered with outlet box protector, Appleton SB-CK, or similar device/method to keep dirt/debris from entering box, conduit or panels. If dirt/debris does get in, it shall be removed prior to pulling wires.
29. All boxes installed outdoors shall be suitable for outdoor installations, gasketed, screw cover, and painted as directed by the Architect with weatherproof paint to match building.
30. All conduit entries to outdoor mounted panels, cabinets, boxes, etc., shall be made using Myers "SCRU-TITE" hubs Series ST.
31. Provide nylon or a 1/8-inch O.D. polyethylene rope, rated at 250 pounds tensile strength, in all conduits more than 5 feet in length left empty for future use. Not less than 5 feet of rope shall be left at each end of the conduit. Tag all lines with a plastic tag at each end indicating the termination/stub location of the opposite end of the conduit.
32. All multiple conduit runs within suspended ceilings shall be suspended from building structure by means of unistrut hangers/racks, Conduit shall not be allowed to lay on ceiling or be supported from ceiling suspension wires or other suspension system.
Support conduit to structure above suspended ceilings 8 inches minimum above ceiling to allow removal of ceiling tile. Maintain 2-inch clearance above recessed light fixtures
33. All exposed conduits and support hardware shall be painted to match the finish of the wall or ceiling to which it is supported.
34. Where conduits or wireways cross seismic joints, provide approved flexible conduit connection or approved expansion/deflection fitting to allow for displacement of conduit in all three axes. Connection shall allow for movement in accordance with design of seismic joint. Non-flexible raceways crossing expansion joints or other areas of possible structural movement shall make provision for 3-way movement at such points by means of expansion/deflection fittings. Fittings shall be installed in the center of their axes of movement and shall not be deflected to make part of a conduit bend, or compressed or extended to compensate for incorrect conduit expansion/deflection fittings(s) complete with ground jumpers. Where necessary, provide approved expansion joints to allow for thermal expansion and contraction of conduit(s). Install expansion joints complete with ground jumpers.
35. Seal all conduits where termination is subject to moisture or where conduit penetrates exterior wall, floor or roof, in refrigerated areas, classified (hazardous areas) and as indicated on the drawings.
36. Except as otherwise indicated on the Drawings or elsewhere in these specifications, bends in feeder and branch circuit conduit 2 inches or larger shall have a radius or curvature of the inner edge, equal to not less than ten (10) times the internal diameter of the conduit. Except where sweeping vertically into a building, and where sweep radius equals ten (10) times conduit diameter, underground communications and building interconnect conduits 3 inches or larger shall have a minimum 12’-6” radius or curvature of the inner edge. For the serving utilities, radius bends shall be made per their respective specifications.
37. Tag all empty conduits at each accessible end with a permanent tag identifying the purpose of the conduit, footage end-to-end, and the location of the other end. In wet, corrosive outdoor or underground locations, use brass, bronze, or copper 16- For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 18
gauge tags secured to conduit ends with #16 or larger galvanized wire. Inscribe on the tags, with steel punch dies, clear and complete identifying information.
38. The following additional requirements shall apply to underground conduits:
a. Underground conduit shall be Schedule 40 PVC (polyvinyl chloride) unless otherwise indicated elsewhere in these specifications or as required per NEC, or CEC where adopted Article 517.13.
b. For all communications conduits 2 inches and larger and feeders 100A or greater, provide with a minimum 3-inch, (2,000 LB) concrete envelope, 2-inch minimum separation between conduits, installed at depth of not less than 24 inches below grade. (Provide concrete encasement and/or greater minimum conduit depth as required by the Utility Companies.) Conduit separation within a duct bank shall be maintained using plastic spacers located at 5'-0" intervals. Where power and communication conduits are run in a common trench, a 12-inch minimum separation shall be maintained between power and communication conduits or as required by Utility Companies. Where concrete encasement is not required by serving utilities for a utility-only duct bank, provide free draining sand bedding suitable to achieve 95 percent relative compaction based on ASTM D1557 using 6-inch lifts or directed by Utility Company Standards.
c. In all cases, where any conduit(s) pass under a building slab or footing, the electrical Contractor will provide a Bentonite clay or concrete barrier that conforms to the height and width of the trench excavation extending a minimum of 24 inches on either side of the foundation. In all cases, where conduit(s) pass through a sleeve in a footing or other foundation element, the electrical Contractor will provide a Bentonite clay or concrete barrier between the sleeve and the conduit(s) surrounding the conduit(s) for the entire depth of the sleeve. The barrier is required to prevent passage of moisture under or through the slab or footing via the trench or sleeve.
d. Where underground conduit passes under a building slab, concrete encasement may not be required, except as required above, contact the Engineer for written direction prior to omitting any encasement. e. Underground conduits, which terminate inside building(s) below grade, such as in a basement level, or which slope so that water might flow into interior building spaces, shall be sealed at the point of penetration with a modular conduit seal (Link-Seal or equal by Rox Systems).
Conduit/conduit sealing system penetrations of waterproofing membranes/systems on existing structures shall be completely restored as required to maintain membrane/system manufacturer and installer warranty for the installation. All conduits shall be provided with a 4 percent slope away from buildings. All conduits shall be installed such that the water cannot accumulate in the conduit and such that water drains into the nearest manhole, pull box or vault – not into the facility. In instances where grade changes or elevation differences prevent sloping of conduit away from a building into the nearest manhole, pull box or vault or where accumulation of water in a manhole, pull box or vault may result in water traveling into the facility, conduits shall be sealed internally at each end of each conduit using conduit sealing bushing, sized as required for the conductors contained within the conduit (O-Z Gedney #CSBG 100psig withstand or equal). In all cases, install plugs or caps in spare (empty) conduits at both ends of each conduit (Jackmoon or equal) preventing both water and gas from entering the facility via the conduits.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 19
f. Include a separate insulated green ground conductor sized per NEC, or CEC where adopted, in each underground electrical feeder/branch circuit.
g. All underground conduits with circuits rated at 40As or greater and all underground communications conduits shall be provided with a metallic marker tape located 12 inches below the finished grade. h. Where underground conduits sweep into/through slabs, utilize PVC 90 degree sweeps that transition, via female PVC adapter to GRC coupling mounted flush in slab. GRC couplings shall be 1/2 lap taped with 20-mil tape. If the distance of the conduit run between a sweep and the next connecting sweep, pullbox, vault or manhole exceeds 150 ft then the sweep shall be concrete encased. Exceptions:
1) Communications conduits shown terminating at a finished floor shall have an additional 4-inch-high GRC nipple equipped with a bushing, removable conduit plug, labeling tag and pull rope. Tie off pull rope to conduit plug.
2) Utility conduit sweeps shall be installed per the requirements of the respective utility company.
i. All PVC conduit shall be glued for a water and gas tight installation. The Contractor shall use appropriate solvent on all joints prior to gluing conduit and fittings together.
j. All underground conduit work shall conform to the Federal, State and Local Safety Orders or Rules regarding excavations, trenches and related earthwork. For projects in California, refer to the California Code of Regulations, Title 8, Construction Code Sections 1540 and 1541 for additional requirements.
39. Installation of Metal Clad (MC) Cable (when use is permitted in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section, generally located on the symbols list drawing).
a. Provide J-box above accessible ceiling prior to running MC cable within partitions or walls. J-box shall be permanently labeled with panel identification and circuit numbers contained within.
b. Overhead MC cable runs shall generally follow building lines to provide a neat and workmanlike installation.
c. Provide code-sized J-boxes to accommodate MC cable splicing in general. For systems furniture poke-through feeds utilizing MC cable, transition from MC cables to conduit and wire near the panelboard in the TI accessible ceiling space on the floor below the panel board via codesized gutter(s). Utilize UL listed, insulated barrier strips with recessed screw heads (Ideal #89-6?? Series or equal) fastened within the gutter(s), terminate MC conductors on one side of the strips(s) and individual conductors in conduit from the panelboard(s) on the other side of the strip(s). Label each terminal strip(s) with panel designation. Label each phase conductor with circuit number using wire markers (Ideal or equal). Wire nuts are not an acceptable alternative to the terminal strips in these underfloor transition locations. Provide (1) spare 3/4-inch conduit from each gutter to its respective panelboard.
d. MC cable shall not run directly into panelboards, distribution boards or electrical rooms.
e. MC cabling shall be provided with its own code-approved ceiling support wires, cable hangers, individual spring steel support clips, steel trapeze hangers, threaded roads or dedicated #10 AWG drop wire. Cable supports shall be fastened to concrete slabs, beams, joists or other structural members of the building. In no case shall MC cable rest on ceilings, suspended ceilings or structures. Do not support MC cable For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 20
using ceiling support wires. The use of nylon cable ties to support MC cable is not allowed.
f. Use lock or spring nut MC cable fittings.
g. Cable runs shall be continuous from wiring device to wiring device – no intermediate splicing J-boxes allowed.
h. When terminating or splicing at a junction, outlet, or switch box, cut the cable with an armored cable rotary cutter such that 6-inches of free conductors remain for connections or splices. Use screw-in or spring lock connector and ensure a proper bonding by firmly tightening the connector to both the box and cable. Insert an anti-short bushing at cable ends to protect conductors from abrasion and use insulated connectors.
i. MC cable bend radius shall not be less than seven (7) times the external diameter of the cable.
j. MC cables passing through fire-rated walls or floors shall be firestopped as required with a UL listed system. See firestopping requirements outlined elsewhere in this specification for additional requirements. k. Installation shall not exceed code requirements for total current carrying conductors in multiple MC Cable runs bundled together into a single MC cable hanger or strap, unless support device is specifically listed for such purpose. Neutrals shall be counted as current carrying conductors. l. Maintain MC Cable clearance of at least 6 inches from hot water and any other high temperature pipes. Maintain at least 12-inches clearance between MC cable(s) and telecommunication conduits and cables. MC cable shall cross telecommunication cables and conduits at right angles. m. MC cabling shall not be run through exposed ceilings, where open grid conditions exist, exposed on walls, or exposed to view. See Power Plan and Lighting Plan General Notes for additional requirements.
40. Installation of Electrical Nonmetallic Tubing (ENT) Cable (when use is permitted in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section generally located on the symbols list drawing). a. When approved for use in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section, generally located on the symbols list drawing, 1/2-inch and 3/4-inch trade size ENT shall be allowed for concealed lighting branch circuits, receptacle branch circuits and miscellaneous signal system circuits within concrete floors, walls and columns within parking structures.
b. ENT conduit shall meet the requirements of Underwriters Laboratories Standards 1479 and 1655, NEMA TC-13, and be UL-listed.
c. All ENT conduit, ENT fittings, ENT boxes and ENT accessories shall be UL listed and manufactured by the same manufacturer so as to form a complete ENT system. ENT systems shall only be used if they are listed for use in fire resistance rated concrete floors and ceilings with resistance ratings as indicated elsewhere in the project plans. ENT system shall comply with NEC, or CEC where adopted, Article 362. d. All ENT fittings and ENT boxes shall be concrete-tight listed without the use of tape. Additionally, ENT fittings shall be constructed of high impact PVC and able to resist ENT conduit pull out forces of a minimum of 175 lbs. ENT fittings with fewer than 6 locking tabs for ENT connection shall utilize manufacturer approved glue as additional protection from fitting/conduit separation. ENT conduit to rigid conduit transition fittings shall be equipped with set screw fittings on the rigid conduit side of the fitting. ENT to metal box fittings shall be equipped with a threaded end and lock washer.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 21
e. Where tubing enters a box, fitting, or other enclosure provide a bushing or adapter to protect conductors from abrasion unless the box, fitting, or enclosure design provides equivalent protection.
f. ENT junction boxes shall have brass screw inserts and shall be rated to support lighting fixtures weighing less than 50 lbs.
g. Concrete tight metal boxes shall be used to support pendant hung fixtures or fixtures over 50 lbs.
h. ENT shall be provided in continuous lengths between junction boxes without use of in-line splices or connectors and shall be clearly marked/labeled at least every 10 feet.
i. All ENT conduit containing electrical branch circuits shall contain a codesized equipment ground conductor. j. ENT shall transition to EMT, IMC, RMC, or rigid PVC, as appropriate or as called out elsewhere in this specification, for all exposed conduits within/on/under a parking structure.
k. ENT shall transition to appropriately sized PVC expansion joint(s) at all structure expansion or seismic joints.
l. ENT shall be securely fastened and supported every 2 – 3 feet and within 1 foot of every junction box and fitting to prevent movement and sag.
m. ENT shall be routed straight without sags, or excessive bending. Where bends are required, comply with Table 362.24 of the NEC for minimum radius of bends. Number of bends shall not exceed quantity allowed by code where used for power and lighting branch circuit and/or feeder conductors. Where utilized for communications system conductors (phones, data cabling, etc.) number of bends shall not exceed the equivalent of (2) 90-degree bends with conduit length no more than 100 feet without installation of a TIA 569-compliant pull box. n. Separation of ENT from fittings, excessive sags, or deflections in ENT runs that prevent pulling of wire and other ENT system product or system installation failures/errors shall be corrected by saw cutting and patching as necessary at no additional cost to the Owner. Use of surface mounted conduits and junction boxes as a repair method is unacceptable.
o. Empty ENT runs shall be provided with a nylon pull string. p. Coordinate installation of raceway with structural steel and other structural members. Do not cut, notch or otherwise alter structural members without obtaining approval in writing from the Structural Engineer of record.
q. No more than (2) 3/4-inch ENT conduits may cross each other within a horizontal concrete slab without obtaining approval in writing from the Structural Engineer of record.
B. Installation of 600-Volt Conductors:
1. All electrical wire, including signal circuits, shall be installed in conduit.
2. All circuits and feeder wires for all systems shall be continuous from over current protective device or switch to terminal or farthest outlet. No joints shall be made except in pull, junction or outlet boxes, or in panel or switchboard gutters. a. Utilize preinsulated "winged" spring type connectors, 3M Company "Performance Plus" #O/B or #R/Y or equal as required for splices and taps in conductors #6 AWG and smaller. When a spring connector is used in an underground environment or when subject to moisture, utilize a 3M Company Scotchcast 3507G epoxy resin connector sealing pack to seal the spring connector. THE USE OF PUSH-WIRE CONNECTORS (e.g. “WAGO” OR EQUIVALENT) IS STRICTLY PROHIBITED.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 22
b. Wires #4 AWG and larger AWG shall be joined together as follows:
1) When located in an underground environment or when subject to moisture, the splice shall be made with compression connector and sealed by a 3M, or equal, PST cold shrink connector insulator. 2) When located in an interior environment, the splice shall be made with an Ilsco or equal dual rated, insulated splice-reducer connector or multi-tap connector-listed for use with 75/90-degree Celsius rated conductors.
c. Connections to busbar shall be made with dual-rated copper/aluminum one-piece compression lugs. Paralleled conductor connections shall be by mechanical lugs.
3. Thoroughly clean all conduit and wire-ways and see that all parts are perfectly dry before pulling any wires.
4. Install UL approved fixture wire from all lighting fixture lamp sockets into fixture outlet or junction box.
5. For 20A branch circuit wiring, increase #12 conductors to #10 for 120-volt circuits longer than 100 feet and for 277V circuits longer than 150 feet.
6. Conductor Support: Provide conductor supports as required by codes and recommended by cable manufacturer. Where required, provide cable supports in vertical conduits and provide lower end of conduit with a ventilator.
C. Grounding/Bonding:
1. Provide grounding and bonding for entire electric installation as shown on plans, as listed herein, and as required by applicable codes. Included, but not limited to, are items that require grounding/bonding:
a. Conduit, Raceways and Cable Trays.
b. Neutral or identified conductors of interior wiring system. c. Panel boards, Distribution Boards, Switchgear and Switchboards. d. Non-current carrying metal parts of fixed equipment. e. Telephone distribution equipment.
f. Transformers, Inverters, UPS, PDU, RDC, Transfer Switch and Generator Systems.
g. Raised Flooring.
h. Exposed metal in maintenance holes, hand holes.
i. Lightning Protection Systems and Antennas.
j. Metal piping installed in or attached to a building/structure. k. Metallically isolated structural steel.
l. Metallically isolated underground metal water piping. m. Elevator hydraulic piston/lift case.
2. In multi-occupancy buildings, Contractor shall bond metal water piping systems instated in, under or attached to a building and/or structure serving individual occupancies where the piping system(s) are metallically isolated from each other.
Per NEC, or CEC where adopted ART. 250.104(A)(2) and (4), the bonding conductor shall be sized per Table 250.122 and connected to the switchboard/panel board serving that suite/occupancy.
3. Use of Ground Rods: Furnish and install required number of 3/4-inch x 10-foot copper clad ground rods to meet specified resistance, all required grounding wires, conduit and clamps. The size of the grounding conductors shall be not less than that set forth in the latest edition of the California Code of Regulations, Title 24, State of California and NEC (CEC, where adopted), unless otherwise indicated.
Rods shall be installed such that at least 10 feet of length is in contact with the soil.
Where rock bottom is encountered, the electrode shall be driven at an oblique angle not to exceed 45 degrees from vertical or shall be buried in a trench that is at least 30 inches deep. The upper end of the electrode shall be flush with or below ground level unless the above ground end and the grounding electrode conductor For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 23
attachments are protected against physical damage. Unless otherwise noted, connection to the grounding electrode conductor may be by compression type or exothermic process connector. Mechanical connectors shall not be used.
4. Grounding System Connection:
a. Compression connectors shall be unplated copper, manufactured by Burndy, or approved equal, designed specifically for the intended connection.
b. Exothermic weld-type connectors shall be ‘Cadweld’ manufactured by Erico Products, or approved equal, designed specifically for the intended connection.
c. Mechanical connectors shall not be used.
5. Isolated Ground Receptacles shall have an insulated ground wire connected between the receptacle and the panelboard isolated ground bus. Unless otherwise noted, this ground wire shall not be grounded at any other point, and shall be distinguished from other ground wires by a continuous yellow stripe.
6. Provide separate green equipment ground conductor in all electrical raceways to effectively ground all fixtures, panels, controls, motors, disconnect switches, exterior lighting standards, and noncurrent carrying metallic enclosures. Use bonding jumpers, grounding bushings, lugs, busses, etc., for this purpose. Connect the equipment ground to the building system ground. Use the same size equipment ground conductors as phase conductors, up through #10 AWG. Use NEC (or CEC where adopted) Table 250.122 for conductor size with phase conductors #8 and larger, if not shown on the Drawings.
7. Clean the contact surfaces of all ground connections prior to making connections.
8. Ductwork: Provide a flexible ground strap, No. 6 AWG equivalent, at each flexible duct connection at each air handler, exhaust fan, and supply fan, and install to preclude vibration.
9. Motors: Connect the ground conductor to the conduit with an approved grounding bushing, and to the metal frame with a bolted solderless lug. Bolts, screws and washers shall be bronze or cadmium plated steel.
10. Building grounding system resistance to ground shall not exceed 25 ohms unless otherwise noted and should be confirmed by testing.
D. Line Voltage and Low Voltage Power Supplies to all Mechanical Equipment Including Plumbing, Heating and Air Conditioning Units:
1. An electric power supply, including conduit, any necessary junction and/or outlet boxes and conductors and connection shall be furnished and installed by the Contractor for each item or mechanical equipment.
2. Power supplies to individual items of equipment shall be terminated in a suitable outlet or junction box adjacent to the respective item of equipment, or a junction box provided by the manufacturer or the equipment and directed by the Mechanical Contractor. Allow sufficient lengths of conductor at each location to permit connection to the individual equipment without breaking the wire run.
3. The location of all conduit terminations to the equipment is approximate. The exact location of these conduit terminations shall be located and installed as directed by the Mechanical and Plumbing Contractor.
4. Provide power supplies to all plumbing and mechanical equipment, including but not limited to, equipment furnished and installed by Owner or Contractor such as heating and air conditioning equipment, pumps, boilers, auto valves, water coolers, trap primers etc. The installation shall produce a complete and operable system.
5. Unless otherwise noted, the Contractor shall furnish and install all conduit, boxes, wires, etc., for line voltage wiring and low voltage wiring.
6. It is the Contractor's responsibility to verify with the drawings of other trades regarding the extent of his responsibility for mechanical equipment. The bid must include a sum sufficient to cover the cost of the installation.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 24
7. The location of all power supply connection and/or terminations to the mechanical equipment is approximate. The exact locations of these terminations shall be verified with other trades during construction.
E. Prefabricated Equipment: Installation of all prefabricated items and equipment shall conform to the requirements of the manufacturer's specifications and installation instruction pamphlets. Where code requirements affect installation of materials and equipment, the more stringent requirements, code or manufacturer's instructions and/or specifications, shall govern the work.
F. Firestopping:
1. The Contractor shall be responsible for furnishing all material, labor, equipment, and services in conjunction with the selection and installation of a complete, fully functioning, code compliant, UL-listed, fire stop assembly/system(s) as required by project conditions.
2. Each fire stop assembly/system shall have an "F" and/or "T" rating as required by each condition requiring fire stopping. Each fire stop assembly/system shall have a current UL listing, as indicated in the latest edition of the UL Fire Resistance Directory. Contractor shall verify acceptability of all fire stopping methods and system selections with the authority having jurisdiction prior to installation. The Contractor shall install each fire stop assembly/system in accordance with the manufacturer's printed instructions.
3. Each fire stop assembly/system shall be labeled with fire stop manufacturerfurnished label on each side of the fire stopping systems depicting UL # etc.
G. Housekeeping Pads
1. Provide a minimum 3-inch-high housekeeping pad above finished floor/finished grade for all floor-mounted switchgear, switchboards, distribution boards, transformers, motor control centers, etc., flush with the face of the equipment.
Located in mechanical central plant(s), other mechanical spaces, and located outdoors, pads shall be flush with the face of the equipment. Confirm pad dimensions with local inspector prior to forming pad to ensure any local code interpretations/conditions are met regarding housekeeping pads.
2. Unless otherwise noted above, provide a minimum 1-1/2-inch-high housekeeping pad above finished floor/finished grade for all interior floor-mounted switchgear, switchboards, distribution boards, transformers, motor control centers, transfer switches etc., flush with the face of the equipment. All housekeeping pad heights are as measured from finished floor or grade. Confirm pad dimensions with local inspector prior to forming pad to ensure any local code interpretations/conditions are met regarding housekeeping pads.
3. Provide a 1-1/2-inch-high housekeeping pad above finished floor/finished for service equipment. Prior to pad rough-in, Contractor shall verify serving utility company's maximum meter height requirements and, if necessary, adjust height of housekeeping pad to comply with those requirements. In indoor applications, the pad shall be flush with the face of the switchgear. In outdoor applications, the housekeeping pad shall extend a minimum of 4 feet from the front of switchgear/switchboard’s weatherproof enclosure. Confirm pad dimensions with local inspector prior to forming pad to ensure any local code interpretations/conditions are met regarding housekeeping pads.
4. All housekeeping pads located in, on or attached to a building shall be seismically braced/connected to the building structure.
END OF SECTION
For Council Approval
Not For Bidding
DRAW
[\\rosenet.loc\rosenetdfs\Desktops\CITYATTORNEY\lippmelissa\Desktop\buildings grounds.docx; 4/21/2026]
DRAWINGS
Project: Vernon Street Town Square Fountain Renovations For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 1
SECTION 260000
GENERAL ELECTRICAL SPECIFICATIONS
PART 1 - GENERAL
1.01 WORK INCLUDED
A. This specification shall apply to all phases of Work hereinafter specified, shown on Drawings, or as required to provide a complete installation of electrical systems for this Project. The intent of the Drawings and Specifications is to provide a complete and operable electrical system that includes all documents that are a part of the Contract.
1. Work Included: Furnish labor, material, services and skilled supervision necessary for the construction, erection, installation, connections, testing, and adjustment of all circuits and electrical equipment specified herein, or shown or noted on Drawings, and its delivery to the Owner complete in all respects ready for use.
2. The Electrical Work includes installation or connection of certain materials and equipment furnished by others. Verify installation details, installation and rough-in locations from the actual equipment or from the equipment shop drawings.
B. Electrical Drawings: Electrical Drawings are diagrammatic, and are intended to convey the scope of work, indicating intended general arrangement of equipment, conduit and outlets.
Follow Drawings in laying out Work and verify spaces for installation of materials and equipment based on actual dimensions of equipment furnished.
C. Related Sections:
1. 13 11 00 Spray Ground General Requirements
2. 13 11 06 Spray Ground Equipment
3. 13 11 07 Spray Ground Mechanical
4. 13 11 08 Spray Ground Electrical
1.02 QUALITY ASSURANCE
A. Design, manufacture, testing and method of installation of all apparatus and materials furnished under requirements of these specifications shall conform to latest publications or standard rules of the following:
1. Institute of Electrical and Electronic Engineers – IEEE
2. National Electrical Manufacturers' Association – NEMA
3. Underwriters' Laboratories, Inc. – UL
4. National Fire Protection Association – NFPA
5. Federal Specifications - Fed. Spec.
6. American Society for Testing and Materials – ASTM
7. American National Standards Institute – ANSI
8. National Electrical Code – NEC
9. National Electrical Safety Code – NESC
10. Insulated Cable Engineers Association – ICEA
11. American Institute of Steel Construction – AISC
12. State and Municipal Codes In Force In The Specific Project Area
13. Occupational Safety and Health Administration (OSHA)
14. Electronics Industries Association/Telecommunications Industry Association (EIA/TIA)
15. California Electrical Code (where adopted)
16. Local Authority Having Jurisdiction (AHJ) Published Electrical Standards and Codes B. Perform Work in accordance with the National Electrical Code, applicable building ordinances, and other applicable codes, hereinafter referred to as the "Code." The Contractor shall comply with the Code including local amendments and interpretations without added cost to the Owner. Where Contract Documents exceed minimum For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 2
requirements, the Contract Documents take precedence. Where code conflicts occur, the most stringent shall apply unless variance is approved.
1. Comply with all requirements for permits, licenses, fees and codes. The Contractor, at Contractor’s expense, shall obtain all permits, licenses, fees, special service costs, inspections and arrangements required for Work under this contract, unless otherwise specified.
2. Comply with requirements of the applicable utility companies serving this Project.
Make all arrangements with utility companies for proper coordination of Work.
1.03 GENERAL REQUIREMENTS
A. Guarantee: Furnish a written guarantee for a period of (1) one-year from date of acceptance.
B. Wherever a discrepancy in quantity or size of conduit, wire, equipment, devices, circuit breakers, etc., (all materials), arises on the Drawing and/or Specifications, the Contractor shall be responsible for providing and installing all material and services required by the strictest condition noted on Drawings and/or in Specifications to ensure complete and operable systems as required by the Owner and Engineer.
C. All Core Cutting, Drilling, and Patching:
1. For the installation of work under this Section, the aforementioned shall be performed under this Section of the Specifications and the Concrete section of the Specifications.
2. No holes will be allowed in any structural members without the written approval of the Project’s Structural Engineer.
3. For penetrations of concrete slabs or concrete footings, the work shall be as directed in the Concrete Section of Specifications.
4. The Contractor shall be responsible for patching and repairing surfaces where he is required to penetrate for work under this contract.
5. Penetrations shall be sealed to meet the rated integrity of the surface required to be patched and repaired. The patched surface shall be painted or finished to match the existing surface.
D. Verifying Drawings and Job Conditions:
1. The Contractor shall examine all Drawings and Specifications in a manner to be fully cognizant of all work required under this Section.
2. The Contractor shall visit the site and verify existing conditions. Where existing conditions differ from Drawings, adjustment(s) shall be made and allowances included for all necessary equipment to complete all parts of the Drawings and Specifications.
1.04 WORK IN COOPERATION WITH OTHER TRADES
A. Examine the Drawings and Specifications and determine the work to be performed by the electrical, mechanical and other trades. Provide the type and amount of electrical materials and equipment necessary to place this work in proper operation, completely wired, tested and ready for use. This shall include all conduit, wire, disconnects, relays, and other devices for the required operation sequence of all electrical, mechanical and other systems or equipment.
B. Provide a conduit-only system for low voltage wiring required for control of mechanical and plumbing equipment described in this or other parts of the Contract Documents. Install all control housings, conduits, and backboxes required for installing conductors to the controls.
C. Install separate conduits between each heating, ventilating and air conditioning sensing device and its control panel and/or control motor. Before installing any conduit for heating, ventilating and air conditioning control wiring, verify the exact requirements from the control diagrams provided with the equipment manufacturer's shop drawings.
1.05 TESTING AND ADJUSTMENT
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 3
A. Upon completion of all electrical work, the Contractor shall test all circuits, switches, light fixtures, lighting control and dimming systems including distributed systems, UPSs, generators, SPDs, lighting inverters, transfer switches, motors, circuit breakers, motor starters and their auxiliary circuits and any other electrical items to ensure perfect operation of all electrical equipment.
B. Equipment and parts in need of correction and discovered during such testing, shall be immediately repaired or replaced with all new equipment and that part of the system shall then be retested. All such replacement or repair shall be done at no additional cost to the Owner.
C. All circuit(s) shall be tested for continuity and circuit integrity. Adjustments shall be made for circuits not complying with testing criteria.
D. All test reports, including copies of any required Energy Code Acceptance Forms (e.g. CA Title 24 Acceptance for Code Compliance Forms) should be submitted to the Engineer at completion of project.
1.06 IDENTIFICATION
A. Nameplates shall be provided for unit substations, switchgear, switchboards, distribution boards, distribution panels, panel boards, motor control centers, transformers, transfer switches, contactors, starters, disconnect switches, enclosed circuit breakers/switches, inverters, UPSs, PDUs, RDCs, SPDs, lighting control panels, dimming panels, door releasing system panels, fire alarm/central monitoring terminal cabinets/power supplies/control panels, and all low voltage system terminal and control cabinets.
1. Nameplate inscriptions shall be identical to the equipment designations indicated in plans and specifications. Nameplates shall be engraved with the device designation/identification on the top line, source identification for the device on the 2nd line per NEC, or CEC where adopted, Art 408.4 and load designation for the device on the bottom line. Where load designation consists of a branch circuit, omit bottom line. Where device designation is not indicated on plans/specifications, Contractor shall submit a written clarification request to the Engineer.
Example: Transformer 1TA
Source Disconnecting Location: Switchboard MSA located in Rm 110 Load: Panels 1LA and 1 LB
2. All circuit breakers/fuses in switchgear, switchboards, distribution boards, distribution panels, UPS output circuit breakers, PDU sub-feed circuit breakers and motor control centers shall have individual nameplates located immediately adjacent to the respective device. Nameplate inscription shall identify the downstream equipment or device served by the circuit breaker or fuse.
B. Identification nameplates, UON, shall be laminated/extruded modified acrylic that is 3/32 inches thick, UV-stabilized, matte finish, suitable for use in 180 deg. F ambient, with beveled edges and engraved white letters 3/8-inch-high, minimum, on 1-1/2-inch-high black background (utility/normal and optional standby power systems) for single line of text.
Where two lines of text are required, provide minimum 2-inch-high nameplate. Where three lines of text are required, provide minimum 2.5-inch-high nameplate. Provide white letters on red background for all NEC, or CEC where adopted, Article 517 essential power systems, Article 700 Emergency Systems, Article 701 Legally required standby systems and Article 708 COPS.
C. Identification nameplates for new switchgear, switchboards, distribution boards, distribution panels, panel boards and motor control centers shall be attached with switchgear manufacturer-provided screws via switchgear manufacturer factory pre-drilled holes. A factory option to rivet identification nameplates to the equipment is only acceptable if screwfastened nameplates are not an available option from the switchgear manufacturer. Field drilling or other mechanical attachment methods that change/void the NEMA or NTRL rating of the enclosure are strictly forbidden.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 4
D. Identification nameplates for transformers, transfer switches, disconnect switches, enclosed circuit breakers/switches, inverters, UPSs, PDUs, RDCs, SPDs, lighting control panels, dimming panels, door releasing system panels, terminal cabinets and all circuit breakers/fuses in switchgear, switchboards, distribution boards, distribution panels, UPS output circuit breakers, PDUs, PDU sub-feed circuit breakers, and motor control centers shall be attached to the equipment by self-adhesive backing integral to the nameplates.
When equipment is located outdoors, provide nameplates without self-adhesive backing and attach to equipment using weather-rated, UV-resistant epoxy. In all cases, clean surfaces before applying identification nameplates parallel to equipment lines.
E. Warning Placards, as required by General Single Line Diagram Notes for multiple power sources, or instruction placards, as required for all kirk-key interlock schemes, all UPS bypass procedures or as required elsewhere in the plans/specifications shall be engraved 1/2-inch-high white lettering on a red background using the same material specified for identification nameplates with a self-adhesive backing. Warning/instruction placards shall be attached to the face of the equipment directly related to the placards. Provide a formal placard submittal for review by the Engineer prior to ordering any warning/instruction placards. In all cases, clean surfaces before applying warning/instruction placards parallel to equipment lines.
F. Receptacles that are part of a UL-listed under floor computer room whip assembly, ceiling and/or cable/ladder tray-mounted receptacles used in lab, manufacturing, commercial kitchen environments or that are serving telecom/data/AV racks and cabinets shall have identification nameplates located on the wiring device plate cover. Nameplates shall be selfadhesive, 3/32-inch-thick Micarta with beveled edges, engraved 1/4-inch-high white lettering on black background with serving power source, circuit identification and NEMA/IEC receptacle type. Use of two (2) separate nameplates per device plate cover is acceptable.
Affix nameplates to be visible when plugs are occupying receptacles.
G. See wiring device section of this specification for wiring device plate cover labeling requirements.
H. See drawings for panel board schedule directory installation requirements.
I. See conduit installation section of this specification for conduit labeling requirements.
1.07 FINAL INSPECTION AND ACCEPTANCE
A. After all requirements of the Specifications and/or the Drawings have been fully completed; representatives of the Owner will inspect the work. Contractor shall provide competent personnel to demonstrate the operation of any item or system to the full satisfaction of each representative.
B. Final acceptance of the work will be made by the Owner after receipt of approval and recommendation of acceptance from each representative.
1.08 RECORD DRAWINGS
A. Drawings of Record: The Contractor shall provide and keep up-to-date, a complete record set of drawings. These shall be corrected daily and show every change from the original Drawings. This set of prints shall be kept on the job site and shall be used only as a record set. This shall not be construed as authorization for the Contractor to make changes in the layout without definite instruction in each case. Upon completion of the work, a set of reproducible Contract Drawings shall be obtained from the General Contractor and all changes as noted on the record set of prints shall be incorporated thereon with black ink in a neat, legible, understandable and professional manner. Refer to the Supplementary General Conditions for complete requirements.
1.09 MAINTENANCE, SERVICING, INSTRUCTION MANUALS AND WIRING DIAGRAMS For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 5
A. Prior to final acceptance of the job, the Electrical Contractor shall furnish to the Owner at least four (4) copies of operating, maintenance, and servicing instructions, as well as four (4) complete wiring diagrams.
B. All wiring diagrams shall specifically cover the system supplied. Typical drawings will not be accepted. Four (4) copies shall be presented to the Owner.
1.10 INTERRUPTION OF SERVICE/SERVICE SHUTDOWN
A. Any interruption of electrical services, electrical circuits, electrical feeders, signal systems, communication systems, fire alarm systems, etc. required to perform work, shall meet the specific prior-approval requirements of the Owner. Such work shall be scheduled with the Owner to be performed at the Owner's convenience.
B. Interruptions/outages of any of the Owner’s systems and services mentioned above shall be scheduled to occur during other than the Owner’s normal business hours. Any overtime costs shall be borne by the Contractor.
C. See drawings for any additional requirements regarding outages, interruption and any temporary services required.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Materials and Equipment: All electrical materials and equipment, including custom-made equipment, shall be new and shall be listed by Underwriter's Laboratories (UL) and bear their label or be listed and certified by a Nationally Recognized Testing Lab (NRTL) that is also recognized by the local Authority-Having-Jurisdiction (AHJ) B. Switchgear/Switchboards/Distribution Boards/Motor Control Centers:
1. See general single line notes on single line drawing for more information.
C. Panel boards – Branch Circuit:
1. See drawings for panel board schedules and specifications.
D. Transformers:
1. See drawings for transformer schedules and specifications.
E. Lighting Fixtures:
1. See drawings for lighting fixture and lamp schedules and additional specifications.
Furnish, install and connect a lighting fixture at each outlet where a lighting fixture type symbol (designated on plans) is shown as being installed. Each fixture shall be complete with all required accessories including sockets, glassware, boxes, spacers, mounting devices, fire rating enclosure and lamps.
2. Ballasts: See lighting fixture schedule notes. All noisy ballasts shall be replaced at no cost to the Owner.
3. Lamps: See lamp/fixture schedule and lamp/lighting fixture schedule notes.
F. Wiring Devices:
1. Provide wiring devices indicated per plan. Devices shall be specification grade.
Acceptable manufacturers are Leviton, Pass and Seymour and Hubbell. Provide all similar devices of same manufacturer, unless indicated otherwise. All device colors shall be from the full range of manufacturer standard color options as selected by the Architect. This selection will be made during the shop drawing review process a. Use of dedicated receptacles is required where plans depict a branch circuit supplying only a single simplex or duplex receptacle. Use of controlled receptacles is required where depicted on plans - see controlled receptacle specifications for additional information.
2. I.G. (isolated ground) receptacle bodies shall be of a basic color specified above with an orange triangle to symbolize isolated ground.
3. H.G. (hospital grade) receptacle bodies shall be of a basic color specified above with a green circle to symbolize hospital grade.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 6
4. When shown circuited with an I.G. conductor, receptacles shall be of an I.G. type.
As an example, a NEMA L6-30R denoted on the plans and shown circuited with an I.G. conductor shall be an I.G. version of that receptacle.
5. Wiring devices located in wood finished areas shall generally be black unless otherwise indicated by the Architect.
6. Wiring devices located in mirrors shall generally be white with stainless steel cover plates unless otherwise indicated by the Architect.
7. In addition to other device requirements listed elsewhere in this specification, 125V (Volt), 15A (Amp) and 20A Tamper-Resistant wiring devices shall be provided as follows:
a. In wet and/or exterior locations.
8. Wiring device cover plates located on recessed boxes shall be commercial grade nylon. Plate color shall match wiring device color UON on plans. Cover plates utilized on surface mounted boxes shall be metal. Plastic cover plates are unacceptable.
9. Except as otherwise noted, all wiring device plates on the project shall be labeled with panel and circuit number(s) utilizing a Brother P-Touch labeling system with 1/2-inch tape (yellow on black) or equal by Herman-Tellerman or Panduit. Locate label on the concealed side of the wiring device plate. Handwritten labels are unacceptable.
10. The Contractor shall provide duplex receptacle outlets in the appropriate configurations necessary to comply with applicable energy code requirements for controlled receptacles and as shown on plans. All wiring devices indicated to be controlled receptacles shall be NEMA-approved, electrical code-compliant with factory markings on the face of the receptacle(s) with the word "Controlled" or utilize further markings and symbols to indicate which receptacles on each outlet is/are controlled. Stickers, field-applied markings or other non-permanent markings are not acceptable. Where a GFCI receptacle outlet is required to be controlled, provide an adjacent controlled duplex receptacle outlet connected on the load side of the GFCI outlet. Generally, one receptacle in a duplex receptacle outlet is required to be controlled. It may be the lower receptacle or upper receptacle based on manufacturer offering. However, the controlled receptacle location within a controlled receptacle outlet shall remain consistent throughout the project. Where an existing duplex receptacle outlet is required to be controlled, provide a new wiring device with the appropriate control configuration necessary to comply with plans. All controlled receptacles shall be connected to a branch circuit controlled by an occupancy sensor-based or relay panel lighting control system. Acceptable manufacturers are Leviton, Pass and Seymour and Hubbell.
11. The following wiring device plates shall have custom engraving:
a. Key operated switches, switches with pilot lights, and switches for the control of motors, heaters and ventilators. Engraving shall be black and occur on the exposed side of the plate indicating the motor, heater, or ventilator controlled.
b. Receptacles on optional standby generator and/or UPS power shall have custom engraved plates with the words "Generator" or "UPS" in black letters. In addition, where located in telecommunications closets, IDFs, server rooms, data centers, labs (wet, dry or electronic) indicate panel board and circuit number.
c. For Health Care Facilities, provide custom engraved device cover plates, for all devices, indicating panel board and circuit number. Devices served by normal/utility power circuits shall have black lettering. Devices served by essential electrical system power circuits shall have red lettering.
d. All stainless steel and nylon device plates shall be engraved using a rotary engraving process except for black lettering on stainless steel For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 7
device plates which may be accomplished via laser etching process. All lettering shall be 3/16 inch high. Provide a dimensioned submittal drawing detailing a typical device faceplate with engraving.
G. Weatherproof Outlet Covers/Assemblies: All Receptacles identified as weatherproof on the drawings shall be weather-resistant, tamper-resistant, GFCI type and equipped as follows:
H. Circuit Breakers:
1. Service entrance circuit breakers smaller than 400A (Amp) frame shall be thermalmagnetic trip with inverse time current characteristics unless otherwise indicated below. Service entrance main circuit breakers and main circuit breakers. 400A frame and larger shall be 100 percent rated, solid-state type as outlined in this specification. All other service entrance circuit breakers, 400A frame and larger, shall be 100 percent rated, solid-state type as outlined in this specification.
2. All non-service entrance circuit breakers 225A and larger shall be thermal magnetic type and have continuously adjustable instantaneous pick-ups of approximately 5 to 10 times trip rating. Breakers shall have either tamper-resistant rating dials or easily changed trip rating plugs with trip ratings as indicated on the Drawings. Rating plugs shall be interlocked so they are not interchangeable between frames.
Additionally, all non-service entrance circuit breakers, 600A frame and larger, located in 480V, 3-phase, 3-wire or 277/480V, 3-phase, 4-wire switchgear, distribution boards, panel boards or busway plugs shall be solid state, 100 percent rated. Breaker shall have built-in test points for testing long delay, short delay and instantaneous, and ground fault (where shown) functions of the breaker by means of a 120V operated test kit. Contractor shall utilize a test kit capable of testing all breakers 400A and above - at the Engineer’s request.
3. All non-service entrance circuit breakers less than 225A shall be molded plastic case, air circuit breakers conforming to UL 489. Provide breakers with thermal magnetic trip units, and a common trip bar for two- or three-pole breakers, connected internally to each pole so tripping of one pole will automatically trip all poles of each breaker. Provide breakers of trip-free and trip-indicating bolt-on type, with quick-make, quick-break contacts. Provide single two- or three-pole breaker interchangeability. Provide padlocking device for circuit breakers as shown on the Drawings.
4. Where a Current Limiting Circuit Breaker (CLCB) is indicated on drawings or as required elsewhere in this specification, provide a UL listed current limiting thermal magnetic circuit breaker(s) UON. An independently operating limiter section within a molded case is not allowed. Coordinate CLCB ratings as required to protect electrical system components on the load side of the CLCB to include, but not limited to, protecting automatic transfer switches, panel boards and lighting control panels.
5. Where a solid-state circuit breaker is indicated on drawings or as required elsewhere in this specification, provide a solid-state circuit breaker with minimum five function complete with built-in current transformers. The five functions shall be independently adjustable and consist of Overload/Long Time Amp Rating, Long Time Delay, Short Time Delay, Short Circuit/Instantaneous Pickup, but may also include Shunt Trip and/or Ground Fault if so indicated on the Drawings. Rating plugs shall be interlocked so they are not interchangeable between frames. Breaker shall have built-in test points for testing long delay and instantaneous, and ground fault (where shown) functions of the breaker by means of a 120V operated test kit.
Contractor shall utilize a test kit capable of testing all breakers 400A and above, at the Engineer’s request.
6. Circuit breakers, 1200A Frame or larger, or circuit breakers with sensors or adjustable trip settings, 1200A or larger, shall be equipped with an Energy Reducing Maintenance Switch that complies with NEC, or CEC where adopted, 240.87 (B) (3) For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 8
unless specified elsewhere with an alternate arc energy reduction method allowed by this same code section.
7. Ground Fault Interrupting Breakers: Provide with molded plastic case, air circuit breakers, similar to above with ground fault circuit interrupt capability, conforming to UL Class A, Group 1.
8. Arc Fault Interrupting Breakers: Provide with molded plastic case, air circuit breakers, similar to above with arc fault circuit interrupt capability, conforming to UL 1699. Provide on all dwelling-unit circuits supplying bedrooms, sleeping quarters etc. as required to comply with NEC, or CEC where adopted, Article 210.12.
9. Tandem or half-sized circuit breakers are not permitted.
10. Series-Rated Breakers: UL listed series-rated combinations of breakers can be used to obtain panelboard-interrupting ratings shown on Drawings. If series-rated breakers are used, switchboards, distribution boards, and panel boards shall be appropriately labeled to indicate the use of series-rated breakers. Shop drawing submittal shall include chart of UL listed devices, which coordinate to provide series rating.
11. Circuit breakers shall be standard interrupting construction. Panelboard shall accept standard circuit breakers up to 100A.
12. Circuit breaker handle accessories shall provide provisions for locking handle in the on or off position.
13. Shunt-trip equipped circuit breakers shall be provided on all elevator feeders.
14. Temperature compensating circuit breaker(s) shall be provided when located in outdoor enclosure(s) or when located in an enclosure subject to high ambient heat due to due nearby industrial processes, etc.
15. Provide 75 degree Celsius-rated conductor lugs/lug kits as required on all circuit breakers to accept conductor quantities and sizes shown on drawings.
16. All circuit breaker terminations shall be suitable for use with 75-degree Celsius ampacity conductors. Listed, dual-rated pin terminals, straight or offset, are acceptable for use to in accommodating oversized or parallel conductor installations.
17. Circuit breakers serving Fire Alarm or Central Monitoring panels and power supplies shall be red in color and lockable in the “ON” position.
I. Disconnect Switches:
1. Non-fusible or fusible, heavy-duty, externally-operated horsepower-rated, 600V A.C:
Provide NEMA 3R, lockable enclosures for all switches located on rooftops, in wet or damp areas and in any area exposed to the elements.
2. Fusible switches shall be Class “R” when 600A or less or Class “L” when greater than 600A.
3. Amperage, Horsepower, Voltage and number of poles per drawings: All shall be clearly marked on the switch nameplate.
4. Provide the Owner’s project manager with one (1) spare set of fuses and two (2) sets of fuse clips/fuses for every set of fuses on the project.
J. Fuses:
1. Provide fuses at all locations shown on the Drawings and as required for supplemental protection:
a. Fuses shall be manufactured by Bussman, Shawmut, or equal. b. All fuses shall be the product of a single manufacturer.
2. Main and Feeder Protection:
a. Protective devices rated greater than 600A: Provide Bussman Hi-Cap fuses, Class L, current limiting, having an interrupting rating of 200,000A RMS.
b. Protective devices rated 600A or less: Provide Bussman Class R fuses, Class RK series current limiting fuses, having an interrupting rating of 200,000A RMS.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 9
3. Motor Protection:
a. Where rating of protective device is greater than 600A, provide Bussman Hi-Cap fuses, Class L, current limiting, having an interrupting rating of 200,000A RMS.
b. Where rating of protective device is 600A or less, provide Bussman Class RK series current limiting fuses, having an interrupting rating of 200,000A RMS.
c. Where fuses feeding motors are indicated, but not sized, it shall be the responsibility of the Contractor to coordinate the fuse size with the motor to provide proper motor running protection.
d. When rejection type fuses are specified (Class RK series) the fuse holder of all switches (specified in other Sections) shall be suitable for the fuses provided.
K. Uninterruptible Power Systems (UPS):
1. See drawings for UPS schedules and specifications.
L. Power Distribution Units (PDU):
1. See drawings for PDU schedules and specifications.
M. Generator Systems:
1. See drawings for Generator schedules and specifications.
N. Transfer Switches:
1. See drawings for Transfer Switch schedules and specifications.
O. Conduit:
1. Galvanized Rigid Conduit (GRC) shall be full weight threaded type steel. Steel conduit shall be protected by overall zinc coating to inside and outside surfaces, applied by the hot dip, metalizing, or sherardizing process.
2. Intermediate Metal Conduit (IMC), shall be hot-dipped galvanized in accordance with UL 1242, and meet Federal Specification WWC-581 (latest revision).
3. Electrical Metallic Tubing (EMT) shall be zinc-coated steel with baked enamel or plastic finish on inside surfaces. EMT shall be dipped in a chromic acid bath to chemically form a corrosion-resistant protective coating of zinc chromate over galvanized surface.
4. Flexible metal conduit shall be constructed of aluminum or hot-dipped galvanized steel strips wound spirally with interlocking edges to provide greatest flexibility with maximum strength. Interior surfaces shall be smooth and offer minimum drag to pulling in conductors. Use only as directed in writing by the Engineer with the exception of 400 Hz feeders and 400 Hz branch circuits which shall be run in flexible aluminum conduit.
5. Liquid-tight conduit (Seal-Tite) shall be galvanized steel flexible conduit as above except with moisture and oil-proof jacket, pre-cut lengths and factory-installed fittings. For outdoor installations and motor connections only unless otherwise noted on drawings.
6. Factory assembled, or off-site assembled wiring systems (such as Metal Clad (MC) Cable, Type AC Cable, Type NM Cable, Type BX Cable, etc.) shall not be used unless otherwise indicated in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section generally located on the symbols list drawing.
7. When approved for use in the Allowed Specification Deviations Section, generally located on the symbols list drawing, MC cables shall be allowed for lighting branch circuits (homeruns shall be EMT), receptacle branch circuits (homeruns shall be EMT) and poke-thru fed systems furniture homeruns. MC shall not be used where exposed, except for a maximum 6-foot length for final connections to light fixtures, or terminate in electrical panelboards or distribution boards. Equipment ground conductor shall be green. Isolated ground conductor shall be green with yellow For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 10
stripe. Provide 600V rated aluminum or lightweight steel interlocking armor Metal Clad (MC) cable with copper conductors, THHN (90-degree C) insulation, and integral equipment grounding conductor and isolated grounding conductor as required. Type AC cable listed for use in patient care areas for non-essential electrical system branch circuits per NEC or CEC where adopted, Article 517.13 shall be required in such areas in lieu of MC cable. Type AC and MC cable shall not be used for essential electrical system branch circuits. MC cable shall be manufactured to Underwriter Laboratory Standard 1569. See PART 3 - EXECUTION section of this specification for additional installation requirements.
8. Nonmetallic Flexible Tubing (ENT) shall not be used unless otherwise indicated in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section generally located on the symbols list drawing. Use of ENT, if allowed, is strictly limited to use in CMU walls and parking structures decks or as directed in writing by the Engineer. See PART 3 - EXECUTION section in this specification for additional installation requirements.
9. Non-Metallic Conduit:
a. Polyvinyl chloride (PVC) rigid conduit, Schedule 40, Type II for underground installation only with solvent welded joints, conforming to Underwriters Laboratories, Inc. (UL) requirements, listed for exposed and direct burial application.
b. Conduit and fittings shall be produced by the same manufacturer.
10. Fire-rated MC Cable:
a. 2-hour fire-rated, polymer insulated 600V MC cable listed and conforming to Underwriters Laboratories, Inc. (UL) 2196 and UL 1569 requirements for installation as an Electrical Circuit Protective System for use in complying with NEC, or CEC where adopted, Articles 695 and 700. Where adopted, cable sheath shall be suitable for use as a NEC or CEC equipment grounding conductor, and shall be listed for use in wet locations to 90 degrees C (Raychem or equal).
b. Cable connectors shall be brass MC connectors.
P. Fittings:
1. Condulet type fittings shall be smooth inside and out, taper threaded with integral insulating bushing and of the shapes, sizes and types required to facilitate installation or removal of wires and cables from the conduit and tubing system.
These fittings shall be of metal, smooth inside and out, thoroughly galvanized, and sherardized cadmium plated.
2. Metallic condulet covers shall have the same finish as the fitting and shall be provided for the opening of each fitting where conductors do not pass through the cover.
3. Connector, coupling, locknut, bushings and caps used with rigid conduit shall be steel, threaded and thoroughly galvanized. Bushings shall be insulated.
4. UON all EMT fittings, connectors and couplings installed in concealed locations, areas not considered to be wet or damp locations by the AHJ, or areas not subject to physical damage, shall be steel, zinc or cadmium plated, threadless, compression, steel locking ring type with insulated throat. Where suitable for use, steel set screw fittings are allowed for trades sizes of 2 inches and smaller.
Insulated throat is not required for fittings, connectors and couplings 1 inch and smaller.
5. All interior and exterior EMT fittings, connectors and couplings, 2 inches and smaller, installed in exposed or concealed locations that are considered by the AHJ to be wet or damp locations, shall be Raintite-listed, steel, zinc or cadmium plated, threadless, compression, steel locking ring type with insulated throat. If Raintitelisted, EMT fittings, connectors and couplings are unavailable for a given trade size For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 11
or if conduit is installed in an area subject to damage – provide rigid metallic or intermediate metallic conduits, fittings, connectors and couplings as required.
6. Flexible steel conduit connectors shall be a malleable iron clamp or squeeze type or steel twist-in type with insulated throat. The finish shall be zinc or cadmium plating.
7. Conduit unions shall be "Erickson" couplings, or approved equal. The use of running threads will not be permitted.
Q. 600 Volt Conductors - Wire and Cable:
1. All conductors shall be copper. Provide stranded conductor for #10 AWG and larger or when making flexible connections to vibrating machinery. Use compression "fork" type connectors or transition to solid conductors when connecting to switches, receptacles, etc.
2. Type THHN/THWN-2 thermoplastic, 600 volts, UL approved, dry and wet locations rated at 90 degrees Celsius, for conductors of all sizes from #12 AWG up to and including 1000 kcmil. RHH/RHW insulation is allowed only to provide an Electrical Circuit Protective System to comply with NEC, or CEC where adopted, Articles 695 and 700.
3. Wire and cable shall be new, manufactured not more than six (6) months prior to installation, shall have size, type of insulation, voltage rating and manufacturer's name permanently marked on outer covering at regular intervals.
4. Wire and cable shall be factory color-coded by integral pigmentation with a separate color for each phase and neutral. Each system shall be color-coded and it shall be maintained throughout.
5. Systems Conductor Color Coding:
a. Power 208/120V, 3PH, 4W:
1) Phase A = Black
2) Phase B = Red
3) Phase C = Blue
4) Neutral = White or White with Phase Color Tracer
5) Switch legs = Purple (Switch legs shall also be identified separately by numerical tags).
6) Travelers = Purple with Black stripe or Pink.
b. Power 480/277V, 3PH, 4W:
1) Phase A = Orange
2) Phase C = Yellow
3) Neutral = Grey or Grey with Phase Color Tracer
4) Switch legs = Purple (Switch legs shall also be identified separately by numerical tags).
5) Travelers = Purple with black stripe or Pink.
c. Ground Conductors: Green
d. Isolated Ground Conductors: Green with continuous yellow stripe. e. Fire Alarm System: As recommended by the manufacturer.
6. All color-coding for #12 through #6 AWG conductor shall be as identified above.
Conductors #4 AWG and larger shall be identified with utilizing phase tape at each termination.
7. No conductors carrying 120V or more shall be smaller than #12 AWG.
8. Aluminum conductors shall not be used.
9. Wire-pulling compounds used as lubricants in installing conductors in raceways shall only be "Polywater J". No oil, grease, graphite, or similar substances may be used. Pulling of #1/0 or larger conductors shall be done with an approved cable pull machine. Other methods; e.g. using vehicles and block and tackle to install conductors are not acceptable.
R. Medium Voltage Conductors (greater than 600V):
1. See drawings for Medium Voltage Cable Schedule and Specifications.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 12
S. Junction and Pullboxes:
1. For interior dry locations, boxes shall be NEMA 1 galvanized one-piece drawn steel, knockout type, with removable, machine screw secured covers.
2. For outside, damp or surface locations, boxes shall be NEMA 3R heavy cast aluminum or cast iron with removable, gasketed, non-ferrous machine screw secured covers.
3. For in-grade applications, junction and pull boxes shall be pre-cast concrete or molded fiberglass manufactured by Christy, Brooks-Jensen, or Utility Vault Co.
Fiberglass boxes shall:
a. Be used only in landscape planter areas that are not subject to damage from lawnmowers, tractors and other machinery.
b. Not be used in lawn or turf areas.
c. Not exceed 11 inches W x 17 inches L in size unless required to be larger to meet code requirements.
4. All boxes shall be sized for the number and sizes of conductors and conduits entering the box and equipped with plaster rings where required.
5. All boxes located in traffic areas shall be traffic rated.
T. Outlet Boxes:
1. For fixtures, boxes shall be galvanized, one-piece drawn steel, knockout type equipped with 3/8-inch fixture studs and plaster rings where required.
2. For convenience outlets, wall switches, or other devices, outlet boxes shall be galvanized one-piece drawn steel, knockout type 4-inch x 4-inch x 2-1/8-inch minimum size with plaster rings as required.
3. For locations where standard boxes are not suitable due to number and size of conduit to be terminated, special boxes shall be designed to fit space or meet other requirements, and submitted for approval.
4. For exposure to weather, damp locations, or surface mounting, outlet boxes shall be heavy cast aluminum or cast iron with threaded hubs; covers shall be watertight with gaskets and non-ferrous screws.
5. Outlet boxes used for support of ceiling fans shall be galvanized, one-piece drawn steel, knockout type equipped with bracing bars and plaster rings where required and listed for ceiling fan support use. Such boxes shall be labeled and capable of supporting ceiling fan weights up to 70 pounds.
6. See drawings for floor box installation notes and specifications.
U. Plywood Backboards: Where indicated for telephone or communications system terminals or other equipment assemblies, provide backboards of size indicated. Use 3/4-inch-thick x 8 foot all (length per plans), Douglas Fir, void-free, kiln-dried, fire-rated plywood finished on one side and prime coat painted on all surfaces with finish coat of enamel paint, color by Architect. Leave one (1) fire-rating stamp/sheet exposed for inspection.
V. Terminal Cabinets:
1. Terminal cabinets shall be fabricated of hot dipped galvanized code gauge sheet metal for flush or surface mounting, complete with barriered sections, a door for each vertically barriered section and sizes as indicated on plan. Doors shall be hinged and lockable. Locks shall be keyed to match the branch circuit panelboards.
Terminal cabinet trims shall match the branch circuit panels.
2. Provide each terminal cabinet with a full size mounting backplate.
3. Terminal cabinets shall be installed complete with full-length skirts of the same construction and finish as the terminal cabinet.
4. Where mounted outdoors, terminal cabinets shall be NEMA 3R, weatherproof complete with gaskets and required sealant to prevent moisture from entering the terminal cabinet.
5. All terminal cabinets and terminal cabinet barriered sections shall be labeled by the cabinet or cabinet section use (i.e. CATV, Security, etc.). Labels shall be Micarta For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 13
type as specified elsewhere in these specifications. Unless otherwise noted, all termination blocks and cables shall be labeled per ANSI/EIA 606 standard.
W. Painting: Terminal cabinets, panels, junction boxes, pull boxes, etc., and conduit installed in public view shall be painted with colors selected by the Architect to match the subject surfaces. Refer to painting section of the specifications for additional requirements.
X. Seismic Design, Certification and Anchoring of Electrical Equipment:
1. Contractor shall include all costs in the base bid for labor, materials, all special inspections and structural engineering design necessary to meet the Seismic Design Requirements for Non-structural Components (Chapter 13, ACE SEI 7-05 Minimum Design loads for Buildings and Other Structures) as required by IBC, or CBC where adopted, Section 1708 and as related to the installation all electrical equipment furnished under this contract. See Specific Project Site Seismic Criteria on architectural and/or structural plans which include Building Occupancy Category, Seismic Design Category, Design Spectral Response Acceleration (SDS), Height factor ratio (z/h) and Site Class. Non-structural Component Importance Factor (IP) for a particular component shall be determined based on the following criteria:
a. IP = 1.0: Non-life safety, Non-structural Components in an Occupancy Category IV Facility not required for continued operations of the facility or in any other Occupancy Category Facility where component failure will not impair continued operation of the facility.
b. IP=1.5: Designated Seismic Systems are those non-structural components in any Occupancy Category IV facility (except as noted above) or that are a part of any code-defined Critical, Life Safety, Emergency and Legally Required Standby Electrical System.
Additionally, those non-structural components containing hazardous materials shall be classified as Designated Seismic Systems. While Designated Seismic Systems are generally identified on the plans, they may include items such as generators, automatic transfer switches, UPS units and all associated electrical distribution equipment and components necessary for the designated seismic system to form a complete and operable system. The Contractor shall ultimately be responsible for identifying Designated Seismic Systems. For any electrical component either identified on the plans or determined by the contractor to be a Designated Seismic System, all line and load side electrical distribution systems supporting that Designated Seismic System (including, but not limited to, feeders, panel boards switchboards, transformers, all related component supports and attachments etc.) shall be considered a part of the designated seismic system for the purposes of code-compliance and seismic certification.
c. z/h - Height factor ratio: See plans for respective equipment locations.
2. Provide a delegated-design submittal for each of the following seismic-restraint systems to be used as required:
a. Restraint Channel Bracings consisting of MFMA-4, shop-or fieldfabricated bracing assembly made of slotted steel channels with accessories for attachment to braced component at one end and to building structure at the other end, with other matching components, and with corrosion-resistant coating; rated in tension, compression, and torsion forces.
b. Restraint Cables consisting of ASTM A 603 galvanized-steel cables.
End connections made of steel assemblies with thimbles, brackets, swivel, and bolts designed for restraining cable service, with a minimum of two clamping bolts for cable engagement.
c. Seismic-Restraint Accessories consisting of hanger rod/hanger rod stiffener assemblies, multifunctional steel connectors for attaching For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 14
hangers to rigid channel bracings and/or restraint cables, bushings for floor and wall-mounted equipment anchor bolts and resilient isolation washers and bushings.
d. Mechanical Anchor Bolts consisting of drilled-in and stud-wedge or female-wedge type in zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E 488. e. Adhesive Anchor Bolts consisting of drilled-in and capsule anchor system containing resin and accelerator, or injected polymer or hybrid mortar adhesive. Provide specific LEED-compatible environmentallyfriendly resins and adhesives on all LEED projects. Provide anchor bolts and hardware with zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E 488.
3. Submittal shall include design calculations and details for selecting seismic restraints complying with performance requirements, design criteria, and analysis data signed and sealed by the contractor's structural engineer responsible for their preparation. Calculations shall include, but not be limited to, static and dynamic loading caused by equipment weight, operation, and seismic and, if applicable, wind forces required to select seismic and, if applicable, wind restraints and for designing vibration isolation bases. Provide seismic and wind-restraint detailing to support system selection, arrangement of restraints, attachment locations, methods, and spacings with all components identified to include their strengths, directions and values of forces transmitted to the structure during seismic events and association with vibration isolation devices. Sizes of components shall be selected so strength will be adequate to carry present static and seismic loads to accommodate 25 percent spare future capacity within specified loading limits.
4. Any pre-approval and evaluation documentation shall have a California Office of Statewide Health Planning and Development (OSHPD) Special Seismic Certification Preapproval (OSP) demonstrating horizontal and vertical load testing and analysis showing maximum seismic-restraint ratings, by ICC-ES or another agency acceptable to authorities having jurisdiction. Ratings based on independent testing are preferred to ratings based on calculations. If preapproved ratings are not available, submittals based on independent testing are preferred. Calculations (including combining shear and tensile loads) that support seismic-restraint designs must be signed and sealed by a qualified professional engineer.
5. Coordinate the location of embedded connection hardware with supported equipment attachment and mounting points and with requirements for concrete reinforcement and formwork specified elsewhere in the project specifications.
6. Install flexible connections in runs of raceways, cables, wireways, cable trays, and busways where they cross seismic joints, where adjacent sections or branches are supported by different structural elements, and where connection is terminated to equipment that is anchored to a different structural element from the one supporting them as they approach equipment. Flexible connection limitations of the NEC, or CEC where adopted, shall apply.
7. Install seismic-restraint devices using methods approved by OSHPD or an agency acceptable to authorities having jurisdiction providing required submittals for component.
8. Multiple Raceways or Cables: Secure raceways and cables to trapeze member with clamps approved for application by OSHPD or an agency acceptable to authorities having jurisdiction.
9. The contractor shall engage a qualified testing agency to perform tests and inspections as listed in other Project Specifications, but as a minimum shall include at least four of each type and size of installed anchors and fasteners selected by Architect. Schedule tests with Owner, through Architect, before connecting For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 15
anchorage device to restrained component (unless post connection testing has been approved), and with at least seven days' advance notice. Obtain Architect's approval before transmitting test loads to structure. Provide temporary loadspreading members as required. Test to 90 percent of rated proof load of device.
Prepare and submit test and inspections reports.
Y. Trenching and Backfilling: Contractor shall be responsible for trenching and backfilling. Refer to Trenching and Backfilling section of the specifications for complete requirements.
PART 3 - EXECUTION
3.01 PREPARATION AND INSTALLATION
A. Installation of Conduit and Outlet Boxes:
1. All conduit installed in the dry walls or ceilings of a building shall be steel tube (EMT), aluminum tube (EMT), or Intermediate Metal Conduit (IMC). Flexible conduit shall not be used in lieu of EMT, IMC or rigid conduit except as noted herein.
2. Galvanized rigid conduit (GRC) or intermediate metal conduit (IMC) shall be used as follows:
a. When noted on the drawings.
b. When considered exposed to damage by the local AHJ.
c. When installed in wet or damp locations and of a trade size where listedRaintite fittings, connectors, couplings etc. are unavailable. d. When required by NEC or CEC Article 517.13.
e. When installed in concrete and masonry. The use of ENT in CMU walls and parking structures may be allowed only as directed in writing by the Engineer. Request for ENT substitution must be made prior to bid and in accordance with pre-bid substitution requests requirements of these specifications.
3. Intermediate metal conduit (IMC), is approved for use in all locations as approved for GRC or steel-tube EMT and in accordance with NEC, or CEC where adopted, Article 342.
4. Flexible steel conduit shall only be permitted to be used at light fixture outlets and connections to vibrating electrical equipment. Except when concealed in walls or other structural elements, all flexible steel conduit runs shall be less than 6'-0". All outdoor installation shall be made using liquid-tight flex with approved fittings.
Include a separate insulated green ground conductor sized per NEC in each conduit. Other uses of flexible conduit shall be allowed only as approved in writing by the Engineer.
5. Flexible liquidtight conduit shall be installed in lieu of the flexible steel; where required by the NEC, or CEC where adopted, in damp and wet location, where exposed to weather, in refrigerated area (65°F or less), and/or between seismic joints. All rotating electrical equipment shall be supplied with flexible, liquid-tight conduit with appropriate slack and shall not exceed thirty-six (36) inches. Include a separate insulated green ground conductor sized per NEC in each conduit. Other uses of liquidtight flexible conduit shall be allowed as approved in writing by the Engineer on a case by case basis.
6. Rigid metallic conduit installed underground or embedded in concrete shall be 1- inch trade size minimum and shall be wrapped with 20 mil. Polyvinylchloride plastic tape, PVC conduit installed underground or embedded in concrete shall be 3/4-inch minimum trade size.
7. Where required for providing an electrical circuit protective system to comply with NEC, or CEC where adopted, Articles 695 and 700 utilize UL Listed 2-hour firerated, MC cable or UL Listed 2-hour fire-rated RHH/RHW conductors in conduit.
8. Conduit shall be run so as not to interfere with other piping fixtures or equipment.
9. The ends of all conduit shall be cut square, carefully reamed out to full size and shall be shouldered in fitting.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 16
10. No running threads will be permitted in locations exposed to the weather, in concrete or underground. Special union fittings shall be used in these locations.
11. Where conduit is underground, under slabs or grade, exposed to the weather, or in wet locations, make joints liquid tight and gas tight.
12. All metal conduit in masonry and concrete and where concealed under floor slabs shall have joints painted with thread compound prior to makeup.
13. PVC conduit shall not be run in walls except where approved by the Engineer prior to bid in limited instances that may include concrete or CMU walls used in site retaining, parking structures, or exterior equipment yard or enclosure walls, etc.
14. Where conductors enter a raceway or a raceway in a cabinet, pull box, junction box, or auxiliary gutter, the conductors shall be protected by a plastic bushing type fitting providing a smoothly rounded insulating surface.
15. Where conduit extends through roof to equipment on roof area, the Contractor shall provide flashing material compatible with the roofing system as required by the roofing specifications or as required by the Owner’s roof warranty. This flashing shall be delivered to the roofing Contractor for installation. The actual location of all such roof penetrations and outlets shall be verified by the Architect/Owner.
Contractor to verify type of flashing prior to bid and include all costs.
16. All conduit shall be supported at intervals not less than 6'-0" and within 12 inches from any outlet and at each side of bends and elbows. Conduit supports shall be galvanized, heavy stamped, two-hole conduit clamp properly secured.
17. Where conduit racks are used the rack shall consist of two-piece conduit clamps attached to galvanized steel slotted channels, properly secured via threaded rods attached directly to the building structure.
18. Nail-in conduit supports, one-piece set screw type conduit clamps or perforated iron for supporting conduit shall not be used.
19. Seismic Conduit Support:
a. All conduit shall be supported in such a manner that it is securely attached to the structure of the building. Attachment is to be capable of supporting the tributary weight of conduit and contents in any direction.
Maximum spacing of support and braces are to be as follows:
CONDUIT SIZE MAXIMUM SPACING
1/2" to 3" 6'-0"
3-1/2" to 4" 8'-0"
20. All conduit runs shall be installed parallel or perpendicular to walls, structural members, or intersection of vertical planes and ceilings. Field made bends and offset shall be avoided where possible. Crushed or deformed raceway shall not be installed.
21. Open knockouts in outlet boxes only where required for inserting conduit.
22. Locate wall outlet of the same type at same level in all rooms, except where otherwise noted.
23. Outlet boxes on metal studs shall be attached to metal hangers, tack welded or screwed to studs; on wood studs attachment shall be with wood screws, nails are not acceptable.
24. Recessed boxes shall not be mounted back-to-back in any wall; minimum offset shall be 24 inches.
25. Junction Boxes that do not contain any device(s) shall be located in storage rooms, electrical closets, or above accessible ceilings, not in hard lid ceilings or other forms of inaccessible ceilings. Place boxes which must be exposed to public view in a location approved by the Owner’s Project Manager. Provide covers or plates to match adjacent surfaces as approved by the Owner’s Project manager.
26. Surface mounted pull boxes, terminal cabinets, junction boxes, panel boards etc., shall be attached to walls using appropriate screws, fasteners, backing plates, stud blocking etc., as detailed on architectural and/or structural drawings. If architectural and/or structural drawings are not provided on the project, Contractor shall provide For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 17
all necessary mounting hardware and backing support to comply with local building code requirements and any additional requirements imposed by the local AuthorityHaving-Jurisdiction
27. Sleeves shall be installed where conduit passes through masonry or concrete walls and shall be 24-gauge galvanized steel no more than 1/2 inch greater in diameter than the outside diameter of the conduit. When located in non-rated structures, caulk conduit sleeve with stone wool and waterproof below grade. When located in fire rated structures, provide UL listed fire stopping system. See fire stopping section of this specification for additional requirements.
28. All boxes shall be covered with outlet box protector, Appleton SB-CK, or similar device/method to keep dirt/debris from entering box, conduit or panels. If dirt/debris does get in, it shall be removed prior to pulling wires.
29. All boxes installed outdoors shall be suitable for outdoor installations, gasketed, screw cover, and painted as directed by the Architect with weatherproof paint to match building.
30. All conduit entries to outdoor mounted panels, cabinets, boxes, etc., shall be made using Myers "SCRU-TITE" hubs Series ST.
31. Provide nylon or a 1/8-inch O.D. polyethylene rope, rated at 250 pounds tensile strength, in all conduits more than 5 feet in length left empty for future use. Not less than 5 feet of rope shall be left at each end of the conduit. Tag all lines with a plastic tag at each end indicating the termination/stub location of the opposite end of the conduit.
32. All multiple conduit runs within suspended ceilings shall be suspended from building structure by means of unistrut hangers/racks, Conduit shall not be allowed to lay on ceiling or be supported from ceiling suspension wires or other suspension system.
Support conduit to structure above suspended ceilings 8 inches minimum above ceiling to allow removal of ceiling tile. Maintain 2-inch clearance above recessed light fixtures
33. All exposed conduits and support hardware shall be painted to match the finish of the wall or ceiling to which it is supported.
34. Where conduits or wireways cross seismic joints, provide approved flexible conduit connection or approved expansion/deflection fitting to allow for displacement of conduit in all three axes. Connection shall allow for movement in accordance with design of seismic joint. Non-flexible raceways crossing expansion joints or other areas of possible structural movement shall make provision for 3-way movement at such points by means of expansion/deflection fittings. Fittings shall be installed in the center of their axes of movement and shall not be deflected to make part of a conduit bend, or compressed or extended to compensate for incorrect conduit expansion/deflection fittings(s) complete with ground jumpers. Where necessary, provide approved expansion joints to allow for thermal expansion and contraction of conduit(s). Install expansion joints complete with ground jumpers.
35. Seal all conduits where termination is subject to moisture or where conduit penetrates exterior wall, floor or roof, in refrigerated areas, classified (hazardous areas) and as indicated on the drawings.
36. Except as otherwise indicated on the Drawings or elsewhere in these specifications, bends in feeder and branch circuit conduit 2 inches or larger shall have a radius or curvature of the inner edge, equal to not less than ten (10) times the internal diameter of the conduit. Except where sweeping vertically into a building, and where sweep radius equals ten (10) times conduit diameter, underground communications and building interconnect conduits 3 inches or larger shall have a minimum 12’-6” radius or curvature of the inner edge. For the serving utilities, radius bends shall be made per their respective specifications.
37. Tag all empty conduits at each accessible end with a permanent tag identifying the purpose of the conduit, footage end-to-end, and the location of the other end. In wet, corrosive outdoor or underground locations, use brass, bronze, or copper 16- For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 18
gauge tags secured to conduit ends with #16 or larger galvanized wire. Inscribe on the tags, with steel punch dies, clear and complete identifying information.
38. The following additional requirements shall apply to underground conduits:
a. Underground conduit shall be Schedule 40 PVC (polyvinyl chloride) unless otherwise indicated elsewhere in these specifications or as required per NEC, or CEC where adopted Article 517.13.
b. For all communications conduits 2 inches and larger and feeders 100A or greater, provide with a minimum 3-inch, (2,000 LB) concrete envelope, 2-inch minimum separation between conduits, installed at depth of not less than 24 inches below grade. (Provide concrete encasement and/or greater minimum conduit depth as required by the Utility Companies.) Conduit separation within a duct bank shall be maintained using plastic spacers located at 5'-0" intervals. Where power and communication conduits are run in a common trench, a 12-inch minimum separation shall be maintained between power and communication conduits or as required by Utility Companies. Where concrete encasement is not required by serving utilities for a utility-only duct bank, provide free draining sand bedding suitable to achieve 95 percent relative compaction based on ASTM D1557 using 6-inch lifts or directed by Utility Company Standards.
c. In all cases, where any conduit(s) pass under a building slab or footing, the electrical Contractor will provide a Bentonite clay or concrete barrier that conforms to the height and width of the trench excavation extending a minimum of 24 inches on either side of the foundation. In all cases, where conduit(s) pass through a sleeve in a footing or other foundation element, the electrical Contractor will provide a Bentonite clay or concrete barrier between the sleeve and the conduit(s) surrounding the conduit(s) for the entire depth of the sleeve. The barrier is required to prevent passage of moisture under or through the slab or footing via the trench or sleeve.
d. Where underground conduit passes under a building slab, concrete encasement may not be required, except as required above, contact the Engineer for written direction prior to omitting any encasement. e. Underground conduits, which terminate inside building(s) below grade, such as in a basement level, or which slope so that water might flow into interior building spaces, shall be sealed at the point of penetration with a modular conduit seal (Link-Seal or equal by Rox Systems).
Conduit/conduit sealing system penetrations of waterproofing membranes/systems on existing structures shall be completely restored as required to maintain membrane/system manufacturer and installer warranty for the installation. All conduits shall be provided with a 4 percent slope away from buildings. All conduits shall be installed such that the water cannot accumulate in the conduit and such that water drains into the nearest manhole, pull box or vault – not into the facility. In instances where grade changes or elevation differences prevent sloping of conduit away from a building into the nearest manhole, pull box or vault or where accumulation of water in a manhole, pull box or vault may result in water traveling into the facility, conduits shall be sealed internally at each end of each conduit using conduit sealing bushing, sized as required for the conductors contained within the conduit (O-Z Gedney #CSBG 100psig withstand or equal). In all cases, install plugs or caps in spare (empty) conduits at both ends of each conduit (Jackmoon or equal) preventing both water and gas from entering the facility via the conduits.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 19
f. Include a separate insulated green ground conductor sized per NEC, or CEC where adopted, in each underground electrical feeder/branch circuit.
g. All underground conduits with circuits rated at 40As or greater and all underground communications conduits shall be provided with a metallic marker tape located 12 inches below the finished grade. h. Where underground conduits sweep into/through slabs, utilize PVC 90 degree sweeps that transition, via female PVC adapter to GRC coupling mounted flush in slab. GRC couplings shall be 1/2 lap taped with 20-mil tape. If the distance of the conduit run between a sweep and the next connecting sweep, pullbox, vault or manhole exceeds 150 ft then the sweep shall be concrete encased. Exceptions:
1) Communications conduits shown terminating at a finished floor shall have an additional 4-inch-high GRC nipple equipped with a bushing, removable conduit plug, labeling tag and pull rope. Tie off pull rope to conduit plug.
2) Utility conduit sweeps shall be installed per the requirements of the respective utility company.
i. All PVC conduit shall be glued for a water and gas tight installation. The Contractor shall use appropriate solvent on all joints prior to gluing conduit and fittings together.
j. All underground conduit work shall conform to the Federal, State and Local Safety Orders or Rules regarding excavations, trenches and related earthwork. For projects in California, refer to the California Code of Regulations, Title 8, Construction Code Sections 1540 and 1541 for additional requirements.
39. Installation of Metal Clad (MC) Cable (when use is permitted in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section, generally located on the symbols list drawing).
a. Provide J-box above accessible ceiling prior to running MC cable within partitions or walls. J-box shall be permanently labeled with panel identification and circuit numbers contained within.
b. Overhead MC cable runs shall generally follow building lines to provide a neat and workmanlike installation.
c. Provide code-sized J-boxes to accommodate MC cable splicing in general. For systems furniture poke-through feeds utilizing MC cable, transition from MC cables to conduit and wire near the panelboard in the TI accessible ceiling space on the floor below the panel board via codesized gutter(s). Utilize UL listed, insulated barrier strips with recessed screw heads (Ideal #89-6?? Series or equal) fastened within the gutter(s), terminate MC conductors on one side of the strips(s) and individual conductors in conduit from the panelboard(s) on the other side of the strip(s). Label each terminal strip(s) with panel designation. Label each phase conductor with circuit number using wire markers (Ideal or equal). Wire nuts are not an acceptable alternative to the terminal strips in these underfloor transition locations. Provide (1) spare 3/4-inch conduit from each gutter to its respective panelboard.
d. MC cable shall not run directly into panelboards, distribution boards or electrical rooms.
e. MC cabling shall be provided with its own code-approved ceiling support wires, cable hangers, individual spring steel support clips, steel trapeze hangers, threaded roads or dedicated #10 AWG drop wire. Cable supports shall be fastened to concrete slabs, beams, joists or other structural members of the building. In no case shall MC cable rest on ceilings, suspended ceilings or structures. Do not support MC cable For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 20
using ceiling support wires. The use of nylon cable ties to support MC cable is not allowed.
f. Use lock or spring nut MC cable fittings.
g. Cable runs shall be continuous from wiring device to wiring device – no intermediate splicing J-boxes allowed.
h. When terminating or splicing at a junction, outlet, or switch box, cut the cable with an armored cable rotary cutter such that 6-inches of free conductors remain for connections or splices. Use screw-in or spring lock connector and ensure a proper bonding by firmly tightening the connector to both the box and cable. Insert an anti-short bushing at cable ends to protect conductors from abrasion and use insulated connectors.
i. MC cable bend radius shall not be less than seven (7) times the external diameter of the cable.
j. MC cables passing through fire-rated walls or floors shall be firestopped as required with a UL listed system. See firestopping requirements outlined elsewhere in this specification for additional requirements. k. Installation shall not exceed code requirements for total current carrying conductors in multiple MC Cable runs bundled together into a single MC cable hanger or strap, unless support device is specifically listed for such purpose. Neutrals shall be counted as current carrying conductors. l. Maintain MC Cable clearance of at least 6 inches from hot water and any other high temperature pipes. Maintain at least 12-inches clearance between MC cable(s) and telecommunication conduits and cables. MC cable shall cross telecommunication cables and conduits at right angles. m. MC cabling shall not be run through exposed ceilings, where open grid conditions exist, exposed on walls, or exposed to view. See Power Plan and Lighting Plan General Notes for additional requirements.
40. Installation of Electrical Nonmetallic Tubing (ENT) Cable (when use is permitted in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section generally located on the symbols list drawing). a. When approved for use in the Allowed Specification Deviations Section or Deductive/Additive Alternate Pricing Section, generally located on the symbols list drawing, 1/2-inch and 3/4-inch trade size ENT shall be allowed for concealed lighting branch circuits, receptacle branch circuits and miscellaneous signal system circuits within concrete floors, walls and columns within parking structures.
b. ENT conduit shall meet the requirements of Underwriters Laboratories Standards 1479 and 1655, NEMA TC-13, and be UL-listed.
c. All ENT conduit, ENT fittings, ENT boxes and ENT accessories shall be UL listed and manufactured by the same manufacturer so as to form a complete ENT system. ENT systems shall only be used if they are listed for use in fire resistance rated concrete floors and ceilings with resistance ratings as indicated elsewhere in the project plans. ENT system shall comply with NEC, or CEC where adopted, Article 362. d. All ENT fittings and ENT boxes shall be concrete-tight listed without the use of tape. Additionally, ENT fittings shall be constructed of high impact PVC and able to resist ENT conduit pull out forces of a minimum of 175 lbs. ENT fittings with fewer than 6 locking tabs for ENT connection shall utilize manufacturer approved glue as additional protection from fitting/conduit separation. ENT conduit to rigid conduit transition fittings shall be equipped with set screw fittings on the rigid conduit side of the fitting. ENT to metal box fittings shall be equipped with a threaded end and lock washer.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 21
e. Where tubing enters a box, fitting, or other enclosure provide a bushing or adapter to protect conductors from abrasion unless the box, fitting, or enclosure design provides equivalent protection.
f. ENT junction boxes shall have brass screw inserts and shall be rated to support lighting fixtures weighing less than 50 lbs.
g. Concrete tight metal boxes shall be used to support pendant hung fixtures or fixtures over 50 lbs.
h. ENT shall be provided in continuous lengths between junction boxes without use of in-line splices or connectors and shall be clearly marked/labeled at least every 10 feet.
i. All ENT conduit containing electrical branch circuits shall contain a codesized equipment ground conductor. j. ENT shall transition to EMT, IMC, RMC, or rigid PVC, as appropriate or as called out elsewhere in this specification, for all exposed conduits within/on/under a parking structure.
k. ENT shall transition to appropriately sized PVC expansion joint(s) at all structure expansion or seismic joints.
l. ENT shall be securely fastened and supported every 2 – 3 feet and within 1 foot of every junction box and fitting to prevent movement and sag.
m. ENT shall be routed straight without sags, or excessive bending. Where bends are required, comply with Table 362.24 of the NEC for minimum radius of bends. Number of bends shall not exceed quantity allowed by code where used for power and lighting branch circuit and/or feeder conductors. Where utilized for communications system conductors (phones, data cabling, etc.) number of bends shall not exceed the equivalent of (2) 90-degree bends with conduit length no more than 100 feet without installation of a TIA 569-compliant pull box. n. Separation of ENT from fittings, excessive sags, or deflections in ENT runs that prevent pulling of wire and other ENT system product or system installation failures/errors shall be corrected by saw cutting and patching as necessary at no additional cost to the Owner. Use of surface mounted conduits and junction boxes as a repair method is unacceptable.
o. Empty ENT runs shall be provided with a nylon pull string. p. Coordinate installation of raceway with structural steel and other structural members. Do not cut, notch or otherwise alter structural members without obtaining approval in writing from the Structural Engineer of record.
q. No more than (2) 3/4-inch ENT conduits may cross each other within a horizontal concrete slab without obtaining approval in writing from the Structural Engineer of record.
B. Installation of 600-Volt Conductors:
1. All electrical wire, including signal circuits, shall be installed in conduit.
2. All circuits and feeder wires for all systems shall be continuous from over current protective device or switch to terminal or farthest outlet. No joints shall be made except in pull, junction or outlet boxes, or in panel or switchboard gutters. a. Utilize preinsulated "winged" spring type connectors, 3M Company "Performance Plus" #O/B or #R/Y or equal as required for splices and taps in conductors #6 AWG and smaller. When a spring connector is used in an underground environment or when subject to moisture, utilize a 3M Company Scotchcast 3507G epoxy resin connector sealing pack to seal the spring connector. THE USE OF PUSH-WIRE CONNECTORS (e.g. “WAGO” OR EQUIVALENT) IS STRICTLY PROHIBITED.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 22
b. Wires #4 AWG and larger AWG shall be joined together as follows:
1) When located in an underground environment or when subject to moisture, the splice shall be made with compression connector and sealed by a 3M, or equal, PST cold shrink connector insulator. 2) When located in an interior environment, the splice shall be made with an Ilsco or equal dual rated, insulated splice-reducer connector or multi-tap connector-listed for use with 75/90-degree Celsius rated conductors.
c. Connections to busbar shall be made with dual-rated copper/aluminum one-piece compression lugs. Paralleled conductor connections shall be by mechanical lugs.
3. Thoroughly clean all conduit and wire-ways and see that all parts are perfectly dry before pulling any wires.
4. Install UL approved fixture wire from all lighting fixture lamp sockets into fixture outlet or junction box.
5. For 20A branch circuit wiring, increase #12 conductors to #10 for 120-volt circuits longer than 100 feet and for 277V circuits longer than 150 feet.
6. Conductor Support: Provide conductor supports as required by codes and recommended by cable manufacturer. Where required, provide cable supports in vertical conduits and provide lower end of conduit with a ventilator.
C. Grounding/Bonding:
1. Provide grounding and bonding for entire electric installation as shown on plans, as listed herein, and as required by applicable codes. Included, but not limited to, are items that require grounding/bonding:
a. Conduit, Raceways and Cable Trays.
b. Neutral or identified conductors of interior wiring system. c. Panel boards, Distribution Boards, Switchgear and Switchboards. d. Non-current carrying metal parts of fixed equipment. e. Telephone distribution equipment.
f. Transformers, Inverters, UPS, PDU, RDC, Transfer Switch and Generator Systems.
g. Raised Flooring.
h. Exposed metal in maintenance holes, hand holes.
i. Lightning Protection Systems and Antennas.
j. Metal piping installed in or attached to a building/structure. k. Metallically isolated structural steel.
l. Metallically isolated underground metal water piping. m. Elevator hydraulic piston/lift case.
2. In multi-occupancy buildings, Contractor shall bond metal water piping systems instated in, under or attached to a building and/or structure serving individual occupancies where the piping system(s) are metallically isolated from each other.
Per NEC, or CEC where adopted ART. 250.104(A)(2) and (4), the bonding conductor shall be sized per Table 250.122 and connected to the switchboard/panel board serving that suite/occupancy.
3. Use of Ground Rods: Furnish and install required number of 3/4-inch x 10-foot copper clad ground rods to meet specified resistance, all required grounding wires, conduit and clamps. The size of the grounding conductors shall be not less than that set forth in the latest edition of the California Code of Regulations, Title 24, State of California and NEC (CEC, where adopted), unless otherwise indicated.
Rods shall be installed such that at least 10 feet of length is in contact with the soil.
Where rock bottom is encountered, the electrode shall be driven at an oblique angle not to exceed 45 degrees from vertical or shall be buried in a trench that is at least 30 inches deep. The upper end of the electrode shall be flush with or below ground level unless the above ground end and the grounding electrode conductor For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 23
attachments are protected against physical damage. Unless otherwise noted, connection to the grounding electrode conductor may be by compression type or exothermic process connector. Mechanical connectors shall not be used.
4. Grounding System Connection:
a. Compression connectors shall be unplated copper, manufactured by Burndy, or approved equal, designed specifically for the intended connection.
b. Exothermic weld-type connectors shall be ‘Cadweld’ manufactured by Erico Products, or approved equal, designed specifically for the intended connection.
c. Mechanical connectors shall not be used.
5. Isolated Ground Receptacles shall have an insulated ground wire connected between the receptacle and the panelboard isolated ground bus. Unless otherwise noted, this ground wire shall not be grounded at any other point, and shall be distinguished from other ground wires by a continuous yellow stripe.
6. Provide separate green equipment ground conductor in all electrical raceways to effectively ground all fixtures, panels, controls, motors, disconnect switches, exterior lighting standards, and noncurrent carrying metallic enclosures. Use bonding jumpers, grounding bushings, lugs, busses, etc., for this purpose. Connect the equipment ground to the building system ground. Use the same size equipment ground conductors as phase conductors, up through #10 AWG. Use NEC (or CEC where adopted) Table 250.122 for conductor size with phase conductors #8 and larger, if not shown on the Drawings.
7. Clean the contact surfaces of all ground connections prior to making connections.
8. Ductwork: Provide a flexible ground strap, No. 6 AWG equivalent, at each flexible duct connection at each air handler, exhaust fan, and supply fan, and install to preclude vibration.
9. Motors: Connect the ground conductor to the conduit with an approved grounding bushing, and to the metal frame with a bolted solderless lug. Bolts, screws and washers shall be bronze or cadmium plated steel.
10. Building grounding system resistance to ground shall not exceed 25 ohms unless otherwise noted and should be confirmed by testing.
D. Line Voltage and Low Voltage Power Supplies to all Mechanical Equipment Including Plumbing, Heating and Air Conditioning Units:
1. An electric power supply, including conduit, any necessary junction and/or outlet boxes and conductors and connection shall be furnished and installed by the Contractor for each item or mechanical equipment.
2. Power supplies to individual items of equipment shall be terminated in a suitable outlet or junction box adjacent to the respective item of equipment, or a junction box provided by the manufacturer or the equipment and directed by the Mechanical Contractor. Allow sufficient lengths of conductor at each location to permit connection to the individual equipment without breaking the wire run.
3. The location of all conduit terminations to the equipment is approximate. The exact location of these conduit terminations shall be located and installed as directed by the Mechanical and Plumbing Contractor.
4. Provide power supplies to all plumbing and mechanical equipment, including but not limited to, equipment furnished and installed by Owner or Contractor such as heating and air conditioning equipment, pumps, boilers, auto valves, water coolers, trap primers etc. The installation shall produce a complete and operable system.
5. Unless otherwise noted, the Contractor shall furnish and install all conduit, boxes, wires, etc., for line voltage wiring and low voltage wiring.
6. It is the Contractor's responsibility to verify with the drawings of other trades regarding the extent of his responsibility for mechanical equipment. The bid must include a sum sufficient to cover the cost of the installation.
For Council Approval
Not For Bidding
Vernon Street Town Square Spray Ground 100% Construction Documents February 24, 2026
Electrical
26 00 00 - 24
7. The location of all power supply connection and/or terminations to the mechanical equipment is approximate. The exact locations of these terminations shall be verified with other trades during construction.
E. Prefabricated Equipment: Installation of all prefabricated items and equipment shall conform to the requirements of the manufacturer's specifications and installation instruction pamphlets. Where code requirements affect installation of materials and equipment, the more stringent requirements, code or manufacturer's instructions and/or specifications, shall govern the work.
F. Firestopping:
1. The Contractor shall be responsible for furnishing all material, labor, equipment, and services in conjunction with the selection and installation of a complete, fully functioning, code compliant, UL-listed, fire stop assembly/system(s) as required by project conditions.
2. Each fire stop assembly/system shall have an "F" and/or "T" rating as required by each condition requiring fire stopping. Each fire stop assembly/system shall have a current UL listing, as indicated in the latest edition of the UL Fire Resistance Directory. Contractor shall verify acceptability of all fire stopping methods and system selections with the authority having jurisdiction prior to installation. The Contractor shall install each fire stop assembly/system in accordance with the manufacturer's printed instructions.
3. Each fire stop assembly/system shall be labeled with fire stop manufacturerfurnished label on each side of the fire stopping systems depicting UL # etc.
G. Housekeeping Pads
1. Provide a minimum 3-inch-high housekeeping pad above finished floor/finished grade for all floor-mounted switchgear, switchboards, distribution boards, transformers, motor control centers, etc., flush with the face of the equipment.
Located in mechanical central plant(s), other mechanical spaces, and located outdoors, pads shall be flush with the face of the equipment. Confirm pad dimensions with local inspector prior to forming pad to ensure any local code interpretations/conditions are met regarding housekeeping pads.
2. Unless otherwise noted above, provide a minimum 1-1/2-inch-high housekeeping pad above finished floor/finished grade for all interior floor-mounted switchgear, switchboards, distribution boards, transformers, motor control centers, transfer switches etc., flush with the face of the equipment. All housekeeping pad heights are as measured from finished floor or grade. Confirm pad dimensions with local inspector prior to forming pad to ensure any local code interpretations/conditions are met regarding housekeeping pads.
3. Provide a 1-1/2-inch-high housekeeping pad above finished floor/finished for service equipment. Prior to pad rough-in, Contractor shall verify serving utility company's maximum meter height requirements and, if necessary, adjust height of housekeeping pad to comply with those requirements. In indoor applications, the pad shall be flush with the face of the switchgear. In outdoor applications, the housekeeping pad shall extend a minimum of 4 feet from the front of switchgear/switchboard’s weatherproof enclosure. Confirm pad dimensions with local inspector prior to forming pad to ensure any local code interpretations/conditions are met regarding housekeeping pads.
4. All housekeeping pads located in, on or attached to a building shall be seismically braced/connected to the building structure.
END OF SECTION
For Council Approval
Not For Bidding
AB 626 - 1
[\\rosenet.loc\rosenetdfs\Desktops\CITYATTORNEY\lippmelissa\Desktop\buildings grounds.docx; 4/21/2026] TEXT OF AB 626
Assembly Bill No. 626
CHAPTER 810
An act to add and repeal Section 9204 of the Public Contract Code, relating to public contracts.
[Approved by Governor September 29, 2016. Filed with Secretary of State September 29, 2016.]
LEGISLATIVE COUNSEL’S DIGEST
AB 626, Chiu. Public contracts: claim resolution.
Existing law prescribes various requirements regarding the formation, content, and enforcement of state and local public contracts. Existing law applicable to state public contracts generally requires that the resolution of claims related to those contracts be subject to arbitration.
Existing law applicable to local agency contracts prescribes a process for the resolution of claims related to those contracts of $375,000 or less.
This bill would establish, for contracts entered into on or after January 1, 2017, a claim resolution process applicable to any claim by a contractor in connection with a public works project. The bill would define a claim as a separate demand by the contractor for one or more of the following: a time extension for relief from damages or penalties for delay, payment of money or damages arising from work done pursuant to the contract for a public work, or payment of an amount disputed by the public entity, as specified.
This bill would require a public entity, defined to exclude certain state entities, upon receipt of a claim sent by registered or certified mail, to review it and, within 45 days, provide a written statement identifying the disputed and undisputed portions of the claim. The bill would authorize the 45-day period to be extended by mutual agreement. The bill would require any payment due on an undisputed portion of the claim to be processed within 60 days, as specified. The bill would require that the claim be deemed rejected in its entirety if the public entity fails to issue the written statement.
This bill would authorize, if the claimant disputes the public entity’s written response or if the public entity fails to respond to a claim within the time prescribed, the claimant to demand to meet and confer for settlement of the issues in dispute. The bill would require any disputed portion of the claim that remains in dispute after the meet and confer conference to be subject to nonbinding mediation, as specified. The bill would provide that unpaid claim amounts accrue interest at 7% per annum. The bill would prescribe a procedure by which a subcontractor or lower tier contractor may make a claim through the contractor.
This bill would require the text of these provisions, or a summary, to be set forth in the plans or specifications for any public work which may give rise to a claim. The bill would specify that a waiver of these rights is void and contrary to public policy, except as specified. The bill would also specify that it does not impose liability on a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
For Council Approval
Not For Bidding
AB 626 - 2
[\\rosenet.loc\rosenetdfs\Desktops\CITYATTORNEY\lippmelissa\Desktop\buildings grounds.docx; 4/21/2026] By increasing the duties of local agencies and officials, this bill would impose a statemandated local program.
This bill would, on January 1, 2020, repeal the provision establishing the claim resolution process.
This bill would specify that these provisions constitute a matter of statewide concern.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to these statutory provisions.
The people of the State of California do enact as follows:
SECTION 1. Section 9204 is added to the Public Contract Code, to read:
9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) ”Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) ”Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) ”Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) ”Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.
For Council Approval
Not For Bidding
AB 626 - 3
[\\rosenet.loc\rosenetdfs\Desktops\CITYATTORNEY\lippmelissa\Desktop\buildings grounds.docx; 4/21/2026] (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) ”Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) ”Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each For Council Approval
Not For Bidding