City Council 19 – 48 5/16/2023
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, e ither on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower tier, for Work oflmprovement performed on or off the project site; and (v) Any personal injury, property damage or economic loss to third persons related to and arising from the performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier, of the Work oflmprovement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of CONTRACTOR against CITY or any other Indemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written.
ATTEST:
JENNIFER L. HALL
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: m~ JOSE MONTOYA
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
Onyx Paving Company, Inc.
NAME: Core-/ k:r-scl.1"\PrTITLE: fre~,'d€rl-t--
Page3of3
City Council 19 – 49 5/16/2023
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6907
EXHIBIT A
ADDENDUM NO. ONE
LOCAL STREET PREVENTATIVE MAINTENANCE FY 22-23
.BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: ONYX PAVING COMPANY, INC.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:
Item Description Qty Unit Unit Price Amount
I Unclassified Excavation* CY 700 $1:27 $
~f, ~00
2 Cold Mill (2")* SF 360,000 $ (}. 7 ;l. $;> 5'1, :100
3 Asphalt Rubber Hot Mix (ARHM)* TN 4,600 $ 137 $
IJ30, 200
4 Crack Sealing LS I $ 7:2, oco $
1~, 000
5 Rubberized Emulsion Aggregate Slurry ELT 1.400
$ 777 $
(REAS) Type JI* J, {) 87, 8'00
6 PCC Sidewalk (4")* SF 6,000 $ 13 $
18,000
7 PCC Curb and Gutter (Type A-2-6)* LF 500 $ 7 :;_ $
3<11000
8 PCC Cross Gutter (W=6')* SF 4~800 $ 27 $
I :l ✓ ~PO
9 PCC Wide Gutter (W=6')* SF 250 $ :2 7 $ &, 760
JO Removal of PCC Pavement* CY 75 $:)1~ $ :20, '100
II PCC Pavement with (3-day) Cure with SF 5,000 $ I 3 $ Dowels* v5, ooo
12 PCC Curb Ramp* SF 1.200 $20 $
;)If" OCJO
13 PCC Driveway Approach (T=6")* SF 200 $ ~o $ Lf, tJ~O 14 Root Shave* EA 58 $550 $ 31., '/tJO
P-1 of P-17
City Council 19 – 50 5/16/2023
Item
15 16
17 18
19 20
21 22
23 24
25 CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6907
ADDENDUM NO. ONE
LOCAL STREET PREVENTATIVE MAINTENANCE FY 22-23
Description Qt}' Unit Unit Price Amount
Adjust Sewer and Drainage Manhole EA 57 $ /,JOO $
Frame & Cover to Finished Grade* IJ,f/100
Furnish and Water Valve Frame and EA 50 $ / 600 $
Cover to Finished Grade* I 1'3, 000
Adjust Survey Monument Frame and EA I $ I, 500 $ 11500 Cover to Finished Grade* Furnish and InstaJJ Traffic Loops* EA 53 $ 3Lf5 $ I '6,;]. 88 Protection of Surface Utility LS I $ 9,3C/5 $ 't315 Frames and Cover Catch Basin Type B (W=7') including EA I $ $
Local Depression per City STD. 302 a:;, ooo ~;}., ooo
and 305
24" RCP Storm Drain (2500-D) per LF 30 $ 117 $ :J. 3, 3 /0 City STD. 1150 Aggregate Base (CMB)* CY 100 $ 150 $
/~ 000
Project Advertisement Sign EA 2 $ ~,000 $ ij 000
,
Signing and Striping LS I $
l'l/1 3<10
$
l'l/1 3vO
Construction Permit LS I $15,000 $15,000
P-2ofP-17
City Council 19 – 51 5/16/2023
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6907
ADDENDUM NO. ONE
LOCAL STREET PREVENTATIVE MAINTENANCE FY 22-23
TOTALHASEBID(ltcm 1-25) $ J1 9J.ZOOO. 00
ADD AL TERNA TE BID
Item Description Qty Unit Unit Price Amount
26 Junction Structure Type C per City I EA $ :;J,1, 000 $).7,000 STD. 308* The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. "!' This bid item is considered a Specialty Item per Section 3-2 of the Standard Specitications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work fix the total base bid amount shown above, within (70) working days after the commencement date stated in the Notice to Proceed.
Slurry seal must be completed by September 29th, 2023. All slurry seal work must meet slurry seal weather condition requirements. If slurry seal is not completed by September 29th , liquidated damages wi II be placed on the contractor.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $5,400 per calendar day.
Name of Firm ONYX PAVING COMPANY, INC.
Signature of BIDDER ---1tr-r--1/_·. ___________________ _ Title COREY R. KIRSCHNER - CEO, PRES, VP, SEC, TREA
(Ifan individual, so state. lfa firm or co-partnership, state the firm nameandgive-1h~1rnn~csof all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-3 of P-17
City Council 19 – 52 5/16/2023
EXHIBIT 5
Construction Contract $ 2,954,000.00
Contract Administration, Inspection and Testing $ 443,100.00 Contingencies $ 443,100.00
TOTAL ESTIMATED CONSTRUCTION COSTS $ 3,840,200.00
CONSTRUCTION OF PROJECT NO. 23-6907: Local Street Preventative Maintenance FY22-23
COST ANALYSIS
City Council 19 – 53 5/16/2023
Exhibit 6
City Council 19 – 54 24 5/16/2023
Public Works Agency
www.santa-ana.org/public-works
Item # 20
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
May 16, 2023
TOPIC: Agreements for Capital Improvement Projects On-Call Engineering Services
AGENDA TITLE
Approve Agreements with Kimley-Horn, Tetra Tech, Huitt-Zollars, Inc., RICK Engineering Company, Mark Thomas & Company, Inc., Psomas, Ardurra Group, Inc., CWE, Willdan Engineering, X Engineering & Consulting, Inc., Kleinfelder, Inc., IDS Group, Inc., TAIT & Associates, Inc., Alta Planning + Design, Inc., and KPFF Consulting Engineers for On-Call Engineering Services in an Aggregate Amount Not to Exceed $5,000,000, for up to a Five-Year Term (Non-General Fund).
RECOMMENDED ACTION
Authorize the City Manager to execute agreements with Kimley-Horn, Tetra Tech, HuittZollars, Inc., RICK Engineering Company, Mark Thomas & Company, Inc., Psomas, Ardurra Group, Inc., CWE, Willdan Engineering, X Engineering & Consulting, Inc., Kleinfelder, Inc., IDS Group, Inc., TAIT & Associates, Inc., Alta Planning + Design, Inc., and KPFF Consulting Engineers to provide on-call engineering services for a shared aggregate amount not to exceed $5,000,000, for a three-year term beginning May 16, 2023 and expiring on May 16, 2026, with the provision for one, two-year extension, subject to non-substantive changes approved by the City Manager and City Attorney.
DISCUSSION
On February 21, 2023, the Public Works Agency (PWA) released Request for Proposal (RFP) No. 23-030 to select professional engineering firms to provide on-call engineering services on an as-needed or on-call basis. These services are required to augment City staff efforts to complete delivery of capital improvement projects, which includes professional services related to the design, construction management, and operation of public works infrastructure and City facilities.
The RFP was advertised on the City’s online procurement management and publication system, PlanetBids, with electronic proposals due on March 14, 2023. Twenty-eight responsive proposals were received and evaluated by a selection committee composed of PWA staff. Based on criteria outlined in the RFP, the top 15 professional engineering firms were selected. The following table summarizes the responding firms and their rankings:
City Council 20 – 1 5/16/2023
Agreements for Capital Improvement Projects On-Call Engineering Services May 16, 2023
Firm City Rank
Kimley-Horn Orange, CA 1
Tetra Tech Irvine, CA 2
Huitt-Zollars, Inc. Irvine, CA 3
RICK Engineering Company Irvine, CA 4
Mark Thomas & Company, Inc. Irvine, CA 5
Psomas Santa Ana, CA 6
Ardurra Group, Inc. Newport Beach, CA 7
CWE Fullerton, CA 8
Willdan Engineering Anaheim, CA 9
X Engineering & Consulting, Inc. Santa Ana, CA 10
Kleinfelder, Inc. Laguna Hills, CA 11
IDS Group, Inc. Irvine, CA 12
TAIT & Associates, Inc. Santa Ana, CA 13
Alta Planning + Design, Inc. Los Angeles, CA 14
KPFF Consulting Engineers Newport Beach, CA 15
Based upon the scope of work and selection criteria outlined in RFP 23-030, staff recommends awarding on-call agreements with the top 15 responding professional engineering firms, which will allow the firms to bid on future engineering task orders (Exhibits 1-15). The selected proposals demonstrate that these firms have the necessary capacity and expertise to complete the required services. The consultant’s rates are reasonable and within industry standard, the teams’ qualifications are appropriate, and the selected proposals were determined to provide the best value for the City.
FISCAL IMPACT
There is no fiscal impact at this time. The Public Works Agency will follow the established on-call services process during the FY 2022-2026 contractual term for requesting necessary fiscal review and authorization. Prior to utilizing the on-call services for any of these future task orders, PWA staff must receive Finance and Management Services Agency approval of funding and project activities to be used to ensure funds are available under the authorization limit of $5,000,000. Upon successful completion of the fiscal review, a corresponding Notice to Proceed containing the specific scope and maximum expenditure for the task order will be issued.
Funds will be budgeted and available for expenditure for the remaining fiscal year, and carried forward for consideration in future fiscal years within the Agreement terms in the following, and various other, Public Works Contract Services-Professional Accounts:
Division Account
City Facilities License Agreement 01117605-62300
Traffic and Transportation Engineering 01117620-62300
Traffic Signal Maintenance 02917620-62300
City Council 20 – 2 5/16/2023
Agreements for Capital Improvement Projects On-Call Engineering Services May 16, 2023
Sanitary Sewer Enterprise 05417617-62300
Sanitary Sewer Enterprise 05517660-62300
Sanitary Sewer Enterprise 05617640-62300
Fed Clean Water Protection 05717640-62300
Residential Street Improvement 05817660-62300
Water Enterprise 06017645-62300
Water Enterprise 06617647-62300
Construction Engineering 08617611-62300
Design Engineering 08617612-62300
Traffic Engineering 08617620-62300
Administrative Services 10117601-62300
Development Engineering 10117605-62300
CIP Project Funding Various
Street Lights Maintenance 01117630-62300
Roadway Marking/Signs 01117625-62300
Graffiti Abatement Program 01117642-62300
Street Trees 01117643-62300
Sidewalks 01117626-62300
Environment/Sanitation 06817640-62300
Roadway Cleaning 06817641-62300
Median Landscaping 02917635-62300
Roadway Maintenance 02917660-62300
PWA Right of Way 01117622-62300
EXHIBIT(S)
1. Agreement with Kimley-Horn
2. Agreement with Tetra Tech
3. Agreement with Huitt-Zollars, Inc
4. Agreement with RICK Engineering Company
5. Agreement with Mark Thomas & Company, Inc.
6. Agreement with Psomas
7. Agreement with Ardurra Group, Inc.
8. Agreement with CWE
9. Agreement with Willdan Engineering
10.Agreement with X Engineering & Consulting, Inc.
11.Agreement with Kleinfelder, Inc.
12.Agreement with IDS Group, Inc.
13.Agreement with TAIT & Associates, Inc.
14.Agreement with Alta Planning + Design, Inc.
15.Agreement with KPFF Consulting Engineers
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Kristine Ridge, City Manager
City Council 20 – 3 5/16/2023
CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND
KIMLEY-HORN FOR ON-CALL ENGINEERING SERVICES
THIS AGREEMENT is made and entered into on this 16th day of May, 2023 by and between Kimley-Horn (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A. On February 21, 2023 the City issued a Request for Proposal No. 23-030, by which it desired to retain a Consultant having special skill and knowledge in the field of:
Professional Engineering Services on an on-call basis for the City’s Public Works Agency.
B. Consultant submitted a responsive proposal that was among those selected by the city.
Consultant represents that it is able and willing to provide such services described in the scope of work that was included in the RFP No. 23-030.
C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform the services that were described in the scope of work included in the RFP No. 23-030, during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in “Scope of Services - Exhibit A”, attached hereto and incorporated by reference, and as further described in Consultant’s Proposal, attached hereto an incorporated herein by this reference as “Consultant’s Proposal - Exhibit B”.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for actual services performed under this Agreement at the rates and charges identified in Consultant’s Fee Proposal, which is attached hereto and fully incorporated herein by this reference as “Compensation - Exhibit C”. Consultant is one of fifteen (15) separate consultants selected to provide services on an on-call basis under RFP 23-030. The total compensation for services provided by all consultants selected under RFP 23-030 shall not exceed the shared aggregate amount of $5,000,000.00 during the term of this Agreement, including any extension periods, as set forth in Section 3, below. b. Payment by City shall be made within forty-five (45) days following receipt of proper EXHIBIT 1
City Council 20 – 4 5/16/2023
invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. c. Notwithstanding any contrary terms contained within Consultant’s Fee Proposal, Consultant’s fees shall not exceed 3% annually over the term of this Agreement, including any extension periods, unless directly affected by Prevailing Wage laws.
3. TERM
This Agreement shall commence on May 16, 2023 and end on May 15, 2026, with the option for the City to grant up to a one, two-year extension, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
6. INSURANCE
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with City Council 20 – 5 5/16/2023
the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors.
a. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has secured all insurance required under this Section. b. Insurance coverage shall be at least as broad as:
(i) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
(ii) Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non-owned), with limit no less than $1,000,000 per accident for bodily injury and property damage.
(iii) Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
(iv) Professional Liability (Errors and Omissions) Insurance appropriates to the Consultant’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (v) If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. d. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
(i) Additional Insured Status. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations.
City Council 20 – 6 5/16/2023
General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
(ii) Primary Coverage. For any claims related to this contract, the Consultant’s insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or selfinsurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it.
(iii)Notice of Cancellation. Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. (iv)Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
(v) Self-Insured Retentions. Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.
(vi)Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City. (vii) Claims Made Policies. If any of the required policies provide coverage on a claims-made basis:
• The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
• Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
City Council 20 – 7 5/16/2023
• If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
(viii) Verification of Coverage. Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. (ix)Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.
(x) Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity City Council 20 – 8 5/16/2023
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.
9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.
10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.
City Council 20 – 9 5/16/2023
12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultant and/or contractors retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
City Council 20 – 10 5/16/2023
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
Jennifer L. Hall
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
City Council 20 – 11 5/16/2023
With courtesy copies to:
Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-xx)
P.O. Box 1988
Santa Ana, California 92702
Fax:
To Consultant:
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
[signatures on following page]
Darren Adrian
Contract Manager & Senior Vice President
Kimley-Horn
1100 Town and Country Road, Suite 700
Orange, CA 92868
City Council 20 – 12 5/16/2023
City Council 20 – 13 5/16/2023
EXHIBIT A
SCOPE OF SERVICES
City Council 20 – 14 5/16/2023
City Council 20 – 15 5/16/2023
City Council 20 – 16 5/16/2023
City Council 20 – 17 5/16/2023
City Council 20 – 18 5/16/2023
City Council 20 – 19 5/16/2023
City Council 20 – 20 5/16/2023
City Council 20 – 21 5/16/2023
EXHIBIT B
CONSULTANT’S PROPOSAL
City Council 20 – 22 5/16/2023
Proposal for
On-Call
Engineering Services
RFP No. 23-030
City Council 20 – 23 5/16/2023
i
GMOC77011.2023
Table of Contents
Table of Contents......................................................................................................................................... i
1. Statement of Qualifications ..................................................................................................................... 1 a. Cover Letter......................................................................................................................................... 1 b. Contract Agreement Statement........................................................................................................... 2 c. Firm and Team Experience ................................................................................................................. 2 d. Understanding of Need ....................................................................................................................... 7 e. Willingness to Comply with Agreement Terms ..................................................................................17 f. References .........................................................................................................................................18
2. Scope of Services and Schedule ............................................................................................................ ii
3. Fee Proposal.........................................................................................................................................viii
4. Certifications .......................................................................................................................................... ix City Council 20 – 24 5/16/2023
1 GMOC77011.2023
1. Statement of Qualifications
a. Cover Letter
March 14, 2023
Sean Thomas, Project Manager
City of Santa Ana
Public Works Agency; M-36
20 Civic Center Plaza, Ross Annex
Santa Ana, CA 92701
RE: Proposal for On-Call Engineering Services (RFP No. 23-030) Dear Mr. Thomas and Members of the Selection Committee:
The City of Santa Ana (City) is seeking qualified consultants to join their list of on-call firms for capital improvement projects. Kimley-Horn is very excited for the opportunity to continue our partnership with the City. We have assembled a team that possesses the technical experience and local knowledge that can meet the needs and expectations of the City’s residents and stakeholders. We are confident our team can meet the City’s expectations for the following reasons:
Exceptional Experience and Resources. Kimley-Horn has provided similar services for many on-call contracts for municipalities and agencies across California, and we have developed an approach to making every project a success. Project manager Othman Elmezain, P.E. brings 11 years of experience in civil engineering, managing both small and large projects for clients throughout California as part of on-call contracts or as standalone projects. He will be supported by a skilled team of multidisciplinary engineers, planners, and analysts with experience in a range of fields, from traffic engineering and transportation planning to environmental planning and grant writing. We have supplemented our inhouse team with On Point Land Surveying, Inc., Bess Testlab, Inc., Twining, Inc., and Avant-Garde, Inc. to provide surveying, potholing, geotechnical and grant writing services, respectively. Our team works regularly with each other on a wide range of projects, allowing us to collaborate with the City efficiently and effectively on task orders without having to establish new lines of communication.
Strong Local Presence and Past Experience. Our team of professionals primarily work and live in Orange County and have completed recent work for the City, giving us the local knowledge and experience needed to complete your engineering assignments while coordinating with local stakeholders and regulatory agencies. Our team has worked on the 5th Street and Santa Ana Boulevard Bike Lane PS&E and the South Main Street Corridor Improvements PS&E projects. We will continue to bring the experience and knowledge gained from these projects to this on-call contract to ensure that our work will meet the needs and standards of the City’s residents and local stakeholders.
Communication and Responsiveness. We understand that the basis of a successful project is founded on responsiveness and adequate staffing. Kimley-Horn takes pride in having the responsiveness of a small firm coupled with the staffing and resources of a national-level firm. Our one profit center model allows us to shift personnel to various projects to ensure that we have the adequate number of staff with the skills and experience to successfully deliver on any project. In addition, our Orange office is less than five miles away from the Santa Ana City Hall, allowing us to attend project meetings on short notice.
1100 Town and Country Road
Suite 700
Orange, CA 92868
TEL: 714.939.1030
City Council 20 – 25 5/16/2023
2 GMOC77011.2023
Thank you for considering our proposal. By selecting Kimley-Horn, you capitalize on our team’s extensive experience and well-established, consistent ability to think of and consider your needs first. Should you have any further questions related to this proposal, project manager Othman Elmezain, P.E. will serve as your point of contact for this contract and can be reached at 714.705.1387, othman.elmezain@kimleyhorn.com, or at the address listed above.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Othman Elmezain, P.E. Darren Adrian, P.E.*
Project Manager Contract Manager/Senior Vice President
*As Senior Vice President, Darren Adrian is authorized to make legally binding commitments for KimleyHorn.
Kimley-Horn acknowledges the receipt of Q&A Sets 1-8 and Addendum No. 1, released on February 27, 2023
b. Contract Agreement Statement
Kimley-Horn has reviewed the City’s Standard Agreement that was attached to the RFP and confirms the terms of the Agreement are acceptable. Kimley-Horn has no exceptions to make. c. Firm and Team Experience
Firm Profile
Founded in 1967, Kimley-Horn is a
privately-held corporation that has
grown into a leading engineering
consulting firm offering
comprehensive and innovative
traffic, civil, structural, and
environmental engineering,
landscape design, and
development review services to
public and private agencies
throughout the United States. We
employ more than 6,800 personnel
in 114 offices nationwide, with 12
offices in California—including our
Orange office less than five miles
away from Santa Ana City Hall—which staff over 700 engineers, planners, analysts, and administrative staff. This depth of resources gives us a deep bench to staff and execute virtually any assignment in response to the City’s needs for this on-call contract. From our 56 years of providing on-call services to our clients, we have learned how to deliver tasks efficiently and successfully. We provide our clients with the local knowledge and responsiveness of a small organization, backed by the depth of resources only a national firm could offer.
City Council 20 – 26 5/16/2023
3 GMOC77011.2023
We Know What It Means to be “On-Call”
Kimley-Horn understands what it means to provide services on an as-needed basis for a local government. Our professionals specifically understand the complexities of on-call assignments and know how to develop solutions unique to each community we serve. Since our founding, on-call clients have been a top priority, and our goal is to serve as an extension of the City’s staff. The map below illustrates a number of our current on-call contracts throughout Southern California, proving that we have the comprehensive on-call experience needed to successfully work with you on this important on-call contract.
Project Team and Experience
When you select a consultant, you are really choosing the people who will provide the right combination of relevant experience, technical competence, local knowledge, passion, and superior skill in successful project delivery with an eye for quality and detail with whom you will enjoy working. To provide the level of support the City requires, we have assembled a team that has the depth of experience and expertise needed to complete task orders on-time and within budget. Othman Elmezain, P.E. will serve as the project manager and will be the City’s primary point of contact. Othman will be supported by contract manager/principal-in-charge Darren Adrian, P.E. (who will be in charge should Othman be unavailable); QC/QA managers Frank Hoffmann, P.E., Jean Fares, P.E., and Kevin Thomas, CEP, ENV SP; and a core team of experienced engineers and planners with recent, relevant experience who are ready to support the City when called upon. The organizational chart on the following page identifies the key personnel and support staff to be assigned to the contract and its subsequent task orders.
City Council 20 – 27 5/16/2023
4 GMOC77011.2023
Organization Chart
Subconsultants
On Point Land Surveying, Inc. (Survey)
On Point Land Surveying, Inc. offers highly experienced staff that specialize in boundary surveys, design surveys, construction staking, GPS surveys, topographic surveys, parcel maps, tract maps, and records of survey. They utilize both Static and RTK GPS combined with the latest software for processing geospatial data. Robotic total stations ensure that their survey crew supervisors are not tied to one location and can stay mobile to oversee your project.
City Council 20 – 28 5/16/2023
5 GMOC77011.2023
Twining, Inc. (Geotechnical Engineering)
Twining, Inc. (Twining), a full-service engineering and quality control company established in 1898, has laboratories throughout California and more than 150 inspectors. One of California’s largest service providers of geotechnical, materials testing, and construction inspection services, Twining has been a central part of some of California’s most regionally significant construction projects. Twining is highly regarded by state and local agencies, developers, contractors, consultants, and industry for providing high-quality services that are reliable, timely, and compliant.
Avant-Garde, Inc. (Grant Writing Services)
AVANT-GARDE, Inc. has successfully provided grant research, grant writing, fund administration, compliance management, and community outreach for twenty years and has secured over $498 million in competitive grant funds for local communities. Their understanding of federal and state requirements, funding administration, and the complex diversity of Southern California make AVANT-GARDE uniquely qualified to perform extensive research to identify and secure grants as an “on-call” consultant. The professional staff of AVANT-GARDE well understands the many ways that a single project may affect the entire organization as well as its desired growth and development. They believe in working as a team and bringing their collective strengths to the table to complement each other’s efforts, ultimately resulting in options and services that best serve the client’s goals and objectives.
Bess Testlab, Inc. (Potholing)
Bess Testlab, Inc. (BESS) is a certified MBE & UNION Underground Utility Service Company that provides a complete range of underground utility designation and utility mapping services to both private and public companies throughout California, Nevada, and Arizona. BESS utilizes State-of-the-Art Electromagnetic and Acoustic Pipe Locators, Ground Penetrating Radar (GPR), Vacuum excavation (potholing) equipment, CCTV pipe inspection robotic crawlers, and survey equipment to designate and map all underground utilities. They employ combination of these tools to provide the best approach to solving the most challenging subsurface utility engineering projects, specializing in “hard to find” facilities and blind searches utility investigations.
Availability Table
In the interest of brevity, availability percentages have been provided only for our identified key personnel. Availability of our other support staff can be provided upon request.
Key Personnel Availability Key Personnel Availability
Darren Adrian, P.E. 60% Joseph Bradshaw, P.E. 40%
Othman Elmezain, P.E. 80% Sam McWhorter, P.E. 50%
Frank Hoffmann, P.E. 30% Kevin Aguigui, P.E., T.E., E.E., CSEP 40% Jean Fares, P.E. 30% Tammie Moreno, P.E., QSD/P 40%
Kevin Thomas, CEP, ENV SP 30% Jason Marechal, P.E., LEED AP 50% Timothy Miller, P.E. 50% Dave Barquist, AICP 40%
Rich Lucera, P.E., QSD/P, CFM 50% Mike Colombo, P.E. 40% Michael Madsen, PLA, CLIA, ASLA 50% Anthony Smith, P.E., PLS (On Point) 50% Kirk Ammerman, P.E. 50% Amir Ghavibazoo, PhD (Twining) 50% Jason Melchor, P.E. 60% Megan LeNoue (Avant-Garde) 50%
Andrew Sanford, P.E. 50% Donald Whitman (Bess Testlab) 50% Gyan Sinha, P.E. 50%
City Council 20 – 29 5/16/2023
6 GMOC77011.2023
Team Experience
To highlight our key staff members’ experience, we have included a Staff Experience Matrix below.
Kimley-Horn
Multidisciplinary
Experience
Darren AdrianOthman ElmezainFrank HoffmannJean FaresKevin Thomas Timothy MillerRich LuceraMichael MadsenKirk AmmermanJason MelchorAndrew SanfordGyan SinhaJoseph Bradshaw Sam McWhorterKevin Aguigui Tammie MorenoJason MarechalDave Barquist Civil Engineering ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Environmental Services ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Planning Services ✔ ✔ ✔ ✔ ✔ ✔
Traffic Engineering ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Structural Engineering ✔ ✔ ✔ ✔ ✔
Water and Sewer ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
At-Grade
Crossing/Grade
Separation
✔ ✔ ✔ ✔ ✔ ✔
Erosion Control ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
SWPPP ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Utilities ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Pavement Rehabilitation ✔ ✔ ✔ ✔ ✔ ✔
Drainage and Water
Quality ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Landscape Architecture ✔ ✔ ✔ ✔ ✔ ✔
Irrigation ✔ ✔ ✔ ✔ ✔ ✔
Construction Support ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Grant Writing ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Key Personnel Resumes
We have provided resumes of our project manager, key personnel and subconsultants that will be providing services for this contract starting on the following page. These resumes outline our team’s technical and design experience as it relates to this on-call contract.
City Council 20 – 30 5/16/2023
7 GMOC77011.2023
d. Understanding of Need
Relevant Project Experience
Kimley-Horn has experience providing on-call work for public agencies throughout Southern California.
Below is a matrix that summarizes our team’s extensive experience. Following the table, we have included a list of similar on-call contracts within the last five years and the respective client contact information. Additional project references have been provided in Section 1.f. References.
Project
PS&ETraffic StudiesSignal TimingSignal Coordination PlansConceptual Design Plans/ExhibitsCost Estimating and Value Engineering ServicesTransportation Impact StudiesBid SupportGrant Support On-Call Transportation and
Traffic Engineering Services,
Santa Ana
✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
On-Call Water Resources
Engineering Services, Santa
Ana
✔ ✔ ✔ ✔
On-Call Planning and Traffic
Engineering, Anaheim ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
On-Call Road, Bridge and
Traffic Engineering, Orange
County
✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
On-Call Transportation and
Structural Engineering, San
Bernardino County
✔ ✔ ✔ ✔
On-Call Civil Engineering and
Plan Check, Irvine ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
On-Call Civil Engineering
Design, Santa Monica ✔ ✔ ✔
South Main Street Corridor,
Santa Ana ✔ ✔ ✔ ✔ ✔ ✔
Santa Ana Boulevard and 5th
Street Protected Bike Lanes,
Santa Ana
✔ ✔ ✔ ✔ ✔ ✔ ✔
Ramona Boulevard
Intersection Improvements, El
Monte
✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Ramona Boulevard
Resurfacing, El Monte ✔ ✔ ✔ ✔
Pedley Road and Jurupa Road
Intersection, Jurupa Valley ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
Lincoln Neighborhood
Corridor Project, Santa
Monica
✔ ✔ ✔ ✔ ✔ ✔ ✔
City Council 20 – 31 5/16/2023
8 GMOC77011.2023
Project Experience and References
City of Santa Ana, On-Call Transportation and Traffic Engineering Services, Santa Ana, CA Kimley-Horn has been assisting the City of Santa Ana with its on-call program since 2014. The scope of services for the City’s program includes general engineering design services for a variety of projects such as arterial and local streets improvements, bike paths, storm drain, sewer and water improvements, traffic studies, traffic signal, landscape and irrigation systems, grant application writing, surveying, geotechnical investigation, environmental and planning support services, and public parks design. Our team has successfully assisted the City for this program on several task orders.
Key Staff: Othman Elmezain, Jason Melchor and Darren Adrian Client: Jason Gabriel, City of Santa Ana | 714.647.5664 | [email protected] Dates: 2014 – Ongoing
City of Santa Ana, On-Call Water Resources Engineering Services, Santa Ana, CA Kimley-Horn has been assisting the City of Santa Ana with its on-call program since 2018. The scope of services for the City’s program includes engineering design services for a variety of projects with sewer and water improvements. Our team has successfully assisted the City for this program on several task orders.
Key Staff: Othman Elmezain, Darren Adrian and Kameron Qureshi Client: Brian Ige, City of Santa Ana | 714.647.3385 | [email protected] Dates: 2018 – Ongoing
City of Anaheim, On-Call Planning and Engineering, Anaheim, CA Kimley-Horn has executed several task orders under two multi-year contracts with the City of Anaheim’s Planning and Engineering and Public Works departments. Civil engineering services provided include the preparation of parking studies and traffic studies for private development projects as well as the review of third-party conducted parking and traffic studies. Traffic engineering tasks entail conducting traffic analysis for capacity enhancements or reductions, traffic study support, signal timing and coordination, curb ramp studies, and ITS design. Traffic plan check services include reviewing traffic design plans, reviewing traffic studies for developments, and assisting City staff with traffic circulation and access reviews for developments in the CUP, General Plan Amendment, or reclassification process.
Key Staff: Jason Melchor and Tim Chan
Client: Rafael Cobian, City of Anaheim | 714.765.5176 | [email protected] Dates: 2017 – Ongoing
County of Orange, On-Call Road, Bridge and Traffic Engineering Services, Orange County, CA For more than a decade, Kimley-Horn has been providing the County of Orange Public Works Department with civil and traffic engineering design services. From roadway improvements and highway design to bicycle/pedestrian facilities and complete streets projects, Kimley-Horn has provided the county with project management, design, and planning services. Kimley-Horn team has worked directly with the County’s in-house staff to provide outstanding as-needed civil engineering support for these projects.
Our team recently was selected for another term of the County’s on-call program.
Key Staff: Darren Adrian and Jason Melchor
Client: Austin Morgan, County of Orange | 855.866.5400 | [email protected] Dates: 2008 – Ongoing
City Council 20 – 32 5/16/2023
9 GMOC77011.2023
San Bernardino County, On-Call Transportation and Structural Engineering Services, San Bernardino County, CA
Kimley-Horn has been providing on-call transportation and structural engineering services to San Bernardino County since 2018. Our team is currently providing roadway design services for several task orders consisting of installing and upgrading over 270 curb ramps, sidewalks, spandrels and cross gutters to meet current ADA guidelines. Projects also entail replacement of damaged sidewalk, curb, gutter, driveways, cross-gutter, and pavement rehabilitation (full depth replacement, pulverization, and overlays) for various roads throughout the County.
Key Staff: Othman Elmezain and Darren Adrian
Client: Thomas Bustamonte, San Bernardino County | 909-387-7922 | [email protected]
Dates: 2018 – Ongoing
City of Irvine, On-Call Civil Engineering Design and Street Improvement Plan Check, Irvine, CA Kimley-Horn is part of the City of Irvine’s on-call consultant list for Civil Engineering Design and Street Improvement Plan Check programs. The civil engineering design on-call includes design engineering services for streets, bike trails, storm drains, storm drain channels, land survey, and all related services.
We are providing design and specifications for traffic signals, signing, striping, signal modifications, detour plans, and traffic control. The Street Improvement Plan Check On-Call scope of services includes street improvement plan checking for commercial, industrial, and residential projects. The program requires complete familiarity with the City of Irvine Standards and Design Manual, Caltrans Highway Design Manual, Caltrans Traffic Manual, Caltrans Standard Plans and Specifications, Orange County Hydrology Manual, Orange County Local Drainage Manual, Americans Disability Act, and California Title 24 requirements on accessibility.
Key Staff: Darren Adrian, Sri Chakravarthy and Jason Melchor Client: Eduardo Lopez, City of Irvine | 940.724.6378 | [email protected] Dates: 2018 – Ongoing
City of Santa Monica, On-Call Civil Engineering Design, Santa Monica, CA Kimley-Horn has been providing the City of Santa Monica with on-call civil engineering design and street services for complete PS&E packages. The civil engineering design on-call includes design engineering services for streets, bike lanes, storm drains, ADA improvements, street beautification, plan check reviews, and all related services.
Key Staff: Darren Adrian, Othman Elmezain and Jason Melchor Client: Curtis Castle, City of Santa Monica | 310.458.8721 | [email protected] Dates: 2018 – Ongoing
City Council 20 – 33 5/16/2023
10 GMOC77011.2023
City of Santa Ana, South Main Street Corridor Improvements, Santa Ana, CA Kimley-Horn was selected by the City of Santa Ana to help transform the existing South Main Street into a revitalized corridor. The project involved creating solutions for the following issues: street beautification, traffic safety, walkability, bike circulation, environmental sustainability, security, and neighborhood amenities. Specific goals for the project were:
re-branding the South Main Street Business District with a consistent theme to promote the neighborhood for future developments; enhancing streetscape aesthetics with
landscape and hardscape features to create a more inviting and pleasant urban area; improving street walkable paths with pedestrian safety, curb ramps, crosswalks, and other ADA features; encouraging the use of alternative transportation such as walking, biking, and public transit; improving accessibility to local businesses by providing on street parking; creating a low impact and sustainable design for improvements while considering environmental issues; and enhancing corridor safety and security by adding high visibility crosswalks and pedestrian level street lights.
Key Staff: Darren Adrian, Othman Elmezain and Jason Melchor Client: Sean Thomas, City of Santa Ana | 714.647.5655 | [email protected] Dates: 2017 – 2021
City of Santa Ana, Santa Ana Boulevard & 5th Street Protected Bike Lane PS&E, Santa Ana, CA Kimley-Horn provided engineering design services for Santa Ana Boulevard and 5th Street protected bike project in the City of Santa Ana. The project included two and half miles of protected bike lane facilities along various streets in the City’s downtown area. This project is one of first protected bike lane projects of this magnitude in Orange County. The project consisted of bike signals, pedestrian walkway
improvements, traffic calming features, ADA improvements, signing and striping, and landscape and irrigation design.
The project has involved extensive coordination during the design phase with all stakeholders including the Orange County Transportation Authority for the OC Streetcar project within the same area. The Kimley-Horn team provided the City with alternatives for the design of the bike lanes to provide more protection for all modes of transportation including vehicular, pedestrian, and public transit.
Key Staff: Gyan Sinha, Jason Melchor, Darren Adrian and Michael Madsen Client: Sean Thomas, City of Santa Ana | 714.571.4241 | [email protected] Dates: 2017 – 2022
City Council 20 – 34 5/16/2023
11 GMOC77011.2023
City of El Monte, Ramona Boulevard at Valley Boulevard Intersection Improvements, El Monte, CA The City of El Monte intended to improve the arterial level of service and increase vehicular capacity at the Ramona Boulevard/Valley Boulevard intersection by widening and reconfiguring the existing fivepoint intersection to four-point intersection. The proposed improvements required Right- of-Way acquisitions; geometrical design modifications at Valley Mall to allow for right-in and right-out traffic movement; various utility adjustments/
relocations; traffic signal improvements; bus stop
and bus shelter relocations; and parkway and
sidewalk modifications. The project resulted in a
complete plan, specification, and cost estimate
package for bidding and construction purposes.
Project’s scope of work included Right-of-Way
acquisition, intersection widening, traffic study
and evaluation, traffic safety enhancement, traffic
circulation, CEQA, Phase I and II site
assessments, active transportation, community
engagement and public outreach, drainage
analysis, Water Quality Management Plan,
landscape, and street amenities.
Key Staff: Darren Adrian, Othman Elmezain, Jason Melchor and Randall Kopff Client: Leticia Ortiz, City of El Monte | 626.580.2058 | [email protected] Dates: 2017 – 2022
City of El Monte, Ramona Boulevard Resurfacing Project, El Monte, CA Kimley-Horn provided the City of El Monte with design services to improve pavement conditions for its street network. Our design services included pavement replacement and overlays according to geotechnical recommendations; enhancement of pedestrian and ADA accessibility; a proposed median; restriping to entail Class III bike routes in both directions; repairs to existing damaged curb, gutters, cross-gutters, sidewalks, driveways, and bus pads; traffic signal modifications; and implementation of low-impact development goals, all while meeting state and federal requirements for funding.
Key Staff: Darren Adrian and Othman Elmezain
Client: Kevin Ko, City of El Monte | 808.589.6135 | [email protected] Dates: 2018 – 2021
City of Jurupa Valley, Pedley Road and Jurupa Road Intersection Analysis and Design, Jurupa Valley, CA
Kimley-Horn prepared a traffic analysis study to evaluate the operation at the intersection of Pedley Road and Jurupa Road which is currently controlled by an all-way stop. The study provided recommended measures for any potential deficiencies associated with the intersection. Kimley-Horn analyzed the Existing and General Plan Buildout Conditions and provided recommendations for future improvements.
As a result of the traffic analysis and studies, Kimley-Horn provided design services to widen Jurupa Road and Pedley Road and install new Traffic Signal. Project included right-of-way acquisitions, geometric design modifications, various utility adjustments and relocation, traffic signal installation and railroad grade crossing improvements. Coordination of the at-grade rail crossing improvements with the California Public Utilities Commission (CPUC) and Union Pacific Railroad (UP) was also a part the project tasks.
Key Staff: Jason Melchor, Darren Adrian and Othman Elmezain Client: Mike Meyers, City of Jurupa Valley | 951.332.6464 | [email protected] City Council 20 – 35 5/16/2023
12 GMOC77011.2023
Dates: 2016 – 2022
City of Santa Monica, Lincoln Neighborhood Corridor Streetscape Project (LiNC), Santa Monica, CA Kimley-Horn provided plans, specifications, and cost estimates (PS&E) to the Lincoln Neighborhood Corridor (LiNC), which transformed an aging commuter corridor into an attractive, pedestrian-oriented environment with enhanced multi-modal function. Our team provided roadway design for over 70 curb ramps with each ramp presenting constraints such as building entrances, narrow sidewalks, driveways, steep side streets ,new medians, replacement of damaged sidewalk, curb, gutter, and cross-gutter.
Project included streetscape design and services to enhance the quality of the pedestrian environment, improve mobility for users through right-of-way enhancements, and increase safety for roadway users.
Deliverables included a preliminary design concept, low impact development (LID) technical memorandum; 60%, 100%, and final plans for street improvement, traffic controls, striping and signing, landscape and irrigation, gateway elements, pedestrian safety lighting, and technical specifications.
Key Staff: Darren Adrian, Othman Elmezain and Jason Melchor Client: Curtis Castle, City of Santa Monica | 310.458.8721 | [email protected] Dates: 2018 – 2020
San Bernardino County, Valley Boulevard and Other Roads Project, San Bernardino County, CA Kimley-Horn provided San Bernardino County with engineering design services to improve pavement conditions and upgrade several ADA Curb ramps along Valley Boulevard, Cedar Avenue and Slover Avenue within the Bloomington Area. Our services included the design of pavement replacement, pulverization and overlays according to geotechnical recommendations, and miscellaneous concrete improvements where adjacent improvements were affected. The project included enhancing pedestrian and ADA accessibility, repairs to existing damaged curb, gutters, cross gutters, sidewalk, driveways and traffic signal modifications.
Key Staff: Othman Elmezain and Darren Adrian
Client: Thomas Bustamonte, Count of San Bernardino | 825 E. Third Street, San Bernardino, CA 92415 | 909-387-7922 | [email protected]
Dates: 2018 – 2022
Understanding and Approach to On-Call Services
Our approach to on-call contracts is based on developing a team-oriented approach to the project review process. Key characteristics that distinguish Kimley-Horn include:
• Rapid mobilization of staff for each task order request, including immediate identification of the key personnel and subconsultants needed for each project. The availability of in-house staff provides efficiency and consistent quality of the technical analyses • Ongoing communication and consultation to address issues that arise during the project review process. The collaborative process maintains project progress and results in user-friendly planning documents and legally defensible environmental documents • Commitment of senior level management to the project to provide close coordination with the City, to help confirm technical accuracy, and to carefully monitor budget and schedule compliance • Responsiveness to any significant issues of concern raised by responsible and regulatory agencies and the public
• Flexibility to tailor our approach to meet the specific needs of each project and client We tailor each on-call task assignment’s scope of services specifically to the needs of the individual project and the City. Our familiarity with local standards will help us determine what will be necessary to assist the City with each task order. We will approach each project in the same diligent and comprehensive manner including:
• Scope of work review and understanding
• Data collection and review
• Kick-off meeting
• Site visit with City staff
City Council 20 – 36 5/16/2023
13 GMOC77011.2023
• Evaluation of existing conditions
• Project evaluation and innovation
• Concept layouts and reports
• Interim site walk and review concept
layout of study findings
• Response to comments
Upon notice to proceed, the
appropriate staff will be
assigned by project manager
Othman Elmezain, P.E. to
accomplish the task within
the agreed upon timeframe.
One of the advantages that
our team provides is the
ability to assign the right staff
to each task. Our team can
draw from a multitude of
disciplines and resources to
complete each assignment—
whether the task is relatively
minor, requiring only a few
people in a single discipline, or a complicated task requiring numerous people and multiple disciplines. A task manager will be assigned to each task, and he/she will work closely with the project manager to get the project completed on time and on schedule.
A sample scope of services—including anticipated tasks necessary for successful completion, deliverables, and suggestions for the City—has been provided in Section 2. Scope of Services and Schedule.
Schedule and Cost Control
As our client references will confirm, Kimley-Horn has an excellent record of completing projects on schedule and within budget. We have a sophisticated Management Information System (MIS)—including software such as the CostPoint Engineering Accounting system and Microsoft Power BI—that allows our project managers to monitor budgets closely. Using the Project Effort Reports generated twice monthly by our MIS, project managers gain a clear understanding of the project scope early in the process to develop a realistic, well thought-out work plan. Once the work plan is developed with the stakeholders, the project manager communicates to the project team the key milestones and submittal dates— including time for QC reviews—as well as the importance of maintaining the established schedule and budget. This communication, along with teamwork and organization, results in successful projects and satisfied clients.
The best approach to keeping a project on schedule is to create a risk register whereby we:
1. Track each potential issue
2. Define the criticality of each potential issue
3. Identify the steps and dates for resolution of each potential issue This approach holds the team accountable and forms the basis for the sequence of steps each team member needs to take to reach resolution and keep the project moving forward.
Document Control
We utilize a redundant document control system in which both hard and electronic copies of project deliverables and significant project communications are filed and tracked by project number and key words. Our streamlined electronic filing system includes records of meetings and data shared; City Council 20 – 37 5/16/2023
14 GMOC77011.2023
documentation of design decisions; and data collected and/or provided by others, allowing us to quickly locate project records and respond to your requests in a timely fashion.
Quality Control/Quality Assurance
(QC/QA)
Since our founding, Kimley-Horn has aggressively
pursued a commitment to quality for every task,
deliverable, and service provided by the firm. We
see ourselves as an extension of client staff and
place tremendous emphasis on maintaining high
standards of quality from the inception of a task
through completion. That’s why we’ve developed a
QC/QA manual that every project manager and task
manager is required to know and use. In addition, for
every project, we assign a QC/QA manager to
oversee the quality control process. For this
contract, QC/QA managers Frank Hoffmann, P.E.,
Jean Fares, P.E., and Kevin Thomas, CEP, ENV
SP will provide quality control and assurance by
working with the project team programmatically for adherence to the City’s preferred design, reporting, and communication standards.
Services Offered:
Civil Engineering
Civil/roadway planning and design is a pillar of Kimley-Horn. Our team of planners and engineers can address every aspect of roadway design including intersection geometrics, utility relocations, traffic control, traffic calming, green and complete streets, signing and striping, paving design, drainage, stormwater management, retaining walls, signals and lighting, and hydraulic/hydrologic modeling. Our engineers have developed PS&E for thousands of miles of roadways and sidewalks, including neighborhood streets, rural roads, interstate highways, state highways, highway interchange structures, and urban arterials. These projects—performed for state departments of transportation (DOTs), cities, tribes, private entities, and counties—have included route corridor studies, environmental assessments, and construction sequencing. Our team consists of specialists in the latest best practices and guidelines for multimodal and active transportation networks, first and last-mile solutions, urban bikeways, transit corridors, and pedestrian accessibility.
Traffic Engineering
Kimley-Horn offers complete traffic engineering and design services in-house. We have completed thousands of traffic engineering and operations projects both locally and across the U.S., ranging from major area wide signal systems involving hundreds of intersections to single intersection safety audits, designs, and analyses. Traffic operations, traffic safety, and levels of service are key components in evaluating roadway networks and identifying areas for improvement as well as those warranting further study. We utilize the latest analytical tools including the Highway Capacity Manual (HCM), Synchro, SimTraffic, CORSIM©, and VISSIM, to perform technical operations analyses. We have found these tools to be useful for public involvement and education. In addition, our staff can translate these analyses into easy-to-understand language for public officials as well as project stakeholders.
Structural Engineering
Kimley-Horn has been responsible for the design of over 700 bridges and inspection of more than 4,000 structures (bridges, grade separations, overhead crossings, etc.) across the United States. We have designed bridge structures that cross canals, rivers, railroad, highways, and local streets, and City Council 20 – 38 5/16/2023
15 GMOC77011.2023
understand the differences that make each of these crossings unique. We have designed walls including soil-nail and ground anchor that use top-down construction techniques, mechanically stabilized earth (MSE), and conventional cantilever walls systems. Our professionals have planned and designed hundreds of structures in California and understand how they need to be designed and built for California conditions, and follow the latest codes and manuals. Our engineers utilize the latest AASHTO 8th Edition Bridge Design Specifications, as well as Caltrans Memos to Designer, Seismic Design Criteria, Standard Plans and Specifications in our designs. Kimley-Horn’s bridge design clients include state DOTs, cities, counties, airport authorities, and private developers. Our experience with a variety of structural systems enables us to accurately address a project’s needs regarding scope, schedule, and budget.
Environmental & Planning Services
Kimley-Horn provides a full range of environmental services and permitting for capital improvement projects. This includes CEQA and NEPA review, obtaining regulatory permits, assessing hazardous materials, and completing technical analyses required for environmental documents and permits. In addition, each of these services are supported by our GIS analysts who can complete spatial analysis and maps that are essential for reports and permit applications. Our overall experience means the City has access to a team that can provide comprehensive environmental service.
Pavement Rehabilitation
Kimley-Horn has a successful track record of designing new and innovative pavement rehabilitation projects nationwide. We offer the City significant experience in newer methods, such as Full Depth Asphalt Recycling (FDAR), pulverization techniques, and Asphalt Rubber and Aggregate Membrane (ARAM) as well as additional in-place pavement recycling techniques. Our team is skilled at pavement rehabilitation projects and other factors associated with pavement design, such as: roadway improvements; construction support; federal funding support; utility coordination; and the reduction of traffic impacts during construction.
Drainage and Water Quality
Kimley-Horn staff includes watershed planners and modelers, water quality scientists, natural resource specialists, stormwater (hydraulics/ hydrology/floodplain modeling) engineers, GIS technicians, and stream and wetland design specialists. This team of experts has prepared a long list of documents to comply with the various hydrology/water quality regulations over the years. These range from, but are not limited to, Storm Water Pollution Prevention Plans (SWPPP), Water Quality Technical Reports (WQTR), Water Pollution Control Plans (WPCP), Water Quality Management Plans (WQMP), and Hydromodification Reports/Plans. To provide the best value to our clients, we stay as current as possible with changes in the regulations throughout California.
Landscape and Irrigation
From the revitalization of a popular community park to the design and implementation of a downtown streetscape, Kimley-Horn has successfully planned and implemented scores of landscape architecture projects. We have completed dozens of parks and master-plan projects for federal, state, regional, and local governments. As metropolitan urban areas continue to grow, urban design, streetscape design, and landscape architecture have become integral components of roadway and transportation systems that promote inviting environments for users—including pedestrians and bicyclists—to live, work, and play.
Revitalizing commercial districts, controlling traffic flows, and providing recreational areas and pedestrian and bicycle facilities in increasingly congested areas are some of the solutions designed by our landscape architects and planners. For our public works projects, we consider drought-resistant landscape features and low water usage irrigation systems to help our clients become more successful in meeting their water conservation goals.
City Council 20 – 39 5/16/2023
16 GMOC77011.2023
Water and Sewer Services
Kimley-Horn has experience in all phases of project planning, design, and construction management of sewer and wastewater projects. We have a growing list of collection system condition assessment projects including flow monitoring, infiltration and inflow assessments, smoke and dye testing, hydraulic modeling, rehabilitation and replacement recommendation, capital improvement planning, master planning, rate studies, pipe lining, pipe bursting, bypass pumping, trenchless construction, lift station improvements, and odor and corrosion inspection and control.
At-Grade Crossing/Grade Separation
Our staff is experienced in the preparation and processing of all types of environmental documents under CEQA and NEPA and has extensive knowledge of environmental document requirements. Our environmental professionals not only have years of experience in developing CEQA and NEPA documents for private development, public works and transportation projects, but they also receive regular training on changes in CEQA and NEPA as well as applicable case law affecting the interpretation of current statutes. Kimley-Horn staff has been responsible for preparing all types of documents from Initial Studies and Mitigated Negative Declarations to complete Environmental Impact Reports, Environmental Assessments, and Environmental Impact Statements. Our team has also prepared Mitigation Monitoring Implementation Schedules (MMIS) and Mitigation Monitoring and Reporting Programs (MMRP).
Erosion Control/Stormwater Pollution Prevention Plan (SWPPP) Our water resources experience includes hydrologic and hydraulic analyses, permitting, sedimentation and scour analysis, stormwater quantity and quality issues, and the design of hydraulic structures ranging from pipes, culverts, canals, detention basins, and outlet structures to major water control and pump structures. We have design culvert crossings, levees, small dams, outlet structures, and bridges.
Representative project areas range in size from one to more than 130,000 acres, and our engineers have been called upon by numerous public agencies and major agricultural, industrial, and residential developers as well. Our staff has the knowledge and experience to conduct preliminary studies, prepare stormwater management plans, and coordinate permit applications.
Utilities
Every project is unique and presents its own special design challenges; however, the most frequent challenge we face in local municipal projects is related to existing utilities. Most of the projects anticipated to be part of this on-call are in developed areas where utility facilities are currently within the proposed project area and any improvement will generally affect or be affected by the location of the utility facilities. Kimley-Horn believes in drawing the utility lines and features to their true size in our plans to aid in identifying conflicts early in the design phase; potholing potential conflict locations when budgets allow, which gives a better understanding of the locations of the existing utilities; and extensive coordination with the various utility companies. We also use three-dimensional (3D) modeling of utilities to identify potential conflicts in early stages of design. This method has helped us to avoid discrepancies between construction documents and actual field conditions that resulted in cost effective and timely execution of projects.
Electrical, Instrumentation, and Control Services
Kimley-Horn is a leading consultant in the electrical planning and design of power, motor control centers, motor starters, electrical panels, instrumentation and control systems, lighting design, and communication systems. Our team is thoroughly experienced in all the electrical engineering considerations that may be included in your project(s). Our vast experience allows our team to tackle projects efficiently and precisely in all capacities, ranging from leading large electrical-only projects to small support roles for multidiscipline projects. Kimley-Horn understands that electrical engineering is often a critical component of designing a project. Electrical issues such as utility company coordination, power source access, conduit routing, and existing system integration must be coordinated with all other City Council 20 – 40 5/16/2023
17 GMOC77011.2023
design disciplines prior to the construction phase so that the project schedule is on-track. We base all our designs on the current edition of the National Electrical Code (NEC) and other local standards in order for the requirements to be met and incorporated. Our staff is thoroughly experienced in all aspects of electrical engineering, including light-emitting diode (LED) conversations, developing standards and specifications, and SCADA. The electrical engineering practice utilizes computer-aided design (CAD) and building information modeling (BIM) designs and implementation for seamless coordination between disciplines. Our team can provide the following services: Power Distribution, Coordination Studies, Generator Design, Feasibility Studies, Instrumentation Controls and Life Cycle Evaluations.
Grant Writing and Management
Our team understands that grant administration is a key element in financial management and ensuring your agency follows through on procurements. It is important that agencies understand and follow the regulations established by the administering agency to ensure compliance as well as eligibility for future funding. We have been providing grant application services to many municipalities in Orange County and other areas in Southern California. This has made us familiar with the latest grant requirements for public works projects such as Safe Routes to School (SRTS), High Safety Improvement Program (HSIP), Active Transportation Program (ATP) and other transportation, water resources, and environmental grants.
Bidding and Construction Support
As an extension of our design projects by Kimley-Horn, our team is equipped with the latest construction management systems and applications available in the industry including responding to RFI’s, reviewing shop drawings, and reviewing progress reports. These tools are scalable and customized to best fit the City’s project needs and budget, and to integrate with the City’s way of doing business. From simple, time-tested forms and procedures to the state-of-the-art in construction management and web-based systems, our team will deliver small and large projects on-time and under budget while keeping the City up to date on a “real-time” basis. In addition to receiving the benefit of our design team’s experience, our construction phase personnel can attend pre-construction conferences and regular project meetings, provide review and approval of submittals, and participate in all other activities required to achieve wellcoordinated construction of proposed improvements.
Plan Check Services
Our team has provided plan checking, peer review, and consultant services for various public agencies to assist them with their plan check needs. Kimley-Horn will utilize the City’s in-house plan checklist and plan check documents if available. We will also supplement the City’s checklist with our checklist as each project requires. Kimley-Horn has developed a step-by-step plan review criterion so that every improvement plan is reviewed with a consistent checking process. Each development application is thoroughly reviewed, and the required engineering conditions of approval are prepared to comply with generally sound engineering and construction practice, and applicable city, county, state, and federal standards, building codes, municipal code, ordinances, grading, and drainage requirements. e. Willingness to Comply with Agreement Terms
As stated in Section 1.b. Contract Agreement Statement, Kimley-Horn has reviewed the City’s Standard Agreement that was attached to the RFP and confirms the terms of the Agreement are acceptable. Kimley-Horn has no exceptions to make.
City Council 20 – 41 5/16/2023
18 GMOC77011.2023
f. References
Per the City’s RFP, we have included four client references for whom we have completed work of a similar nature in the past five years below.
On-Call Civil Engineering Design Services, Santa Ana, CA Client: City of Santa Monica
Contact Information: Curtis Castle, Principal City Engineer | 310.458.8721 | [email protected]
On-Call Planning and Engineering, Anaheim, CA
Client: City of Anaheim
Contact Information: Rafael Cobian, Principal Traffic Engineer | 714.765.5176 | [email protected]
On-Call Transportation and Structural Engineering Services, San Bernardino County, CA
Client: San Bernardino County
Contact Information: Thomas Bustamonte, Supervising Engineer | 909.387.7922 | [email protected]
City of Santa Ana, South Main Street Corridor Improvements, Santa Ana, CA
Client: City of Santa Ana
Contact Information: Sean Thomas, Senior Civil Engineer | 714.647.5655 | [email protected]
City Council 20 – 42 5/16/2023
ii GMOC77011.2023
2. Scope of Services and Schedule
Tasks and deliverables shown in this sample scope of services are provided for proposal purposes only.
The nature of tasks and deliverables are project-dependent and will vary for each individual task order as requested by the City.
Task 1 – Project Management, Meetings and Coordination
This task includes project management related tasks such as budget oversight, adherence to project scheduling, and general project coordination. We will communicate with designated City staff (via phone, e-mail, etc.) to provide coordination between the City and Kimley-Horn staff. We will meet with City staff during the course of the project, including one “kick-off” meeting and monthly project progress meetings as requested by the City. The meetings may include discussion on project status and design submittals or to present issues and/or findings.
Deliverables: Meeting agendas, meeting minutes, action items, progress reports, invoicing, draft target schedule and quarterly progress schedule
Task 2 – Field Work and Base Map Preparation
Kimley-Horn will perform a field review of observable conditions. We will collect field notes for the preparation of street improvement plans including existing street geometrics, lane configurations and widths, digital photographs, and inventory and location of existing facilities that may impact placement of proposed improvements. We will conduct an as-built record research at the City of Santa Ana and County of Orange offices to supplement project base mapping.
Deliverable: Field Notes and Photos
Task 3 – Survey
The Kimley-Horn team will provide a design level Topographic Survey at the project intersections. The rights-of-way will be shown for reference based upon available record maps. The team will walk the project intersections with the City’s project manager prior to beginning work. The topographic survey will include:
• The vertical control will be based on a local municipal vertical elevation datum, if available • The horizontal control will be based on the California State Plane Coordinate System of 1983 (NAD 83) by using County of Orange GPS horizontal control points and vertical datum shall be NAVD 88. Survey observations will be taken on 50-foot street cross sections to create 1’ contour intervals
• Spot elevations of grade breaks of curbs, gutters, flow lines, and catch basins • Location, elevation, size, and type of existing visible utilities and improvements • Flow line invert elevations and sizes of existing sanitary sewer and storm drain manholes • Existing driveways and intersections
• Location of existing signing, striping, and traffic control signals • Location of trees over six feet in height, regardless of caliper • Topo will be prepared at 20-scale to include areas ten feet beyond the street right-of-way • Notes will be on 8 ½”x11” bond paper, 3-ring binder
Deliverable: MicroStation V8I Files of Topographic Survey and Field Notes City Council 20 – 43 5/16/2023
iii GMOC77011.2023
Task 4 – Right-of-Way (Preparation of Legal Plats/Descriptions for TCE and PECs)
The Kimley-Horn team will perform relevant research of survey records held within the County Surveyor’s office. Our team will prepare legal descriptions and plat maps for property acquisitions and TCEs. Right of Way cost analysis is not included in this scope of services. Filing any records with the County Surveyor’s office or setting monuments are not included as part of this scope.
Deliverable: PDF copy of research documents and maps. Original stamped and signed legal descriptions and plats
.
Task 5 – Record Research and Utility Coordination
Kimley-Horn will coordinate with affected utility agencies during the design phase. This entails sending utility notification letters to utility agencies identified from readily available City information and the field observation. These letters will notify the utility agency of the project, describe anticipated impacts and identify action required. We will provide follow-up calls to non-responsive agencies and generate a utility disposition matrix to serve as documentation and aid in tracking this task. We will prepare utility notification letters consisting of the following:
• Utility Information Request
• Prepare to Relocate Notice/Final Utility Notice Form
• Notice to Relocate
Deliverables: Utility agency tracking List and utility notification letters Task 6 – Geotechnical and Material Testing
The Kimley-Horn team will conduct a geotechnical field review for Infiltration Test, Soil Stability, and Pavement Evaluation along the project limits. We will compile data and geotechnical analysis of the field and laboratory tests consisting of analyses to evaluate and provide recommendations. We will prepare a report presenting the results of field exploration, geotechnical laboratory testing, engineering analyses, as well as conclusions and recommendations relative to the project. Reports will include analysis and design of new pavement construction and pavement rehabilitation alternatives. The analysis will be performed in general accordance with the Caltrans Highway Design Manual design method.
We assume the design traffic indices (TI) for the project will be provided to us by the City for our analyses. We assume traffic control for pavement borings and percolation tests will be based on Work Area Traffic Control Handbook (WATCH) manual. Preparation of traffic control plans; hot-mix asphalt patching and Full-Depth Reclamation Recommendations are excluded for this task.
Deliverables: Pavement Report and Soil Material Report
Task 7 – Removal Plans
We will provide demolition plans to identify removals of known facilities/improvements within the limits of work. This entails showing removal of primary features such as pavement, curb/gutter, concrete ditch, sidewalk, fencing, signs, guard rail, and large trees. Removal plans will be prepared at a scale of 1” = 20’ horizontal.
Deliverables: Plans, electronic files in Microstation V8I and PDF (final plans will be sealed and signed), and responses to previous review comments from the City Task 8 – Street Improvement Plans
Kimley-Horn will prepare Street Improvement Plans for the roadway improvements. The street improvement plans will be prepared with current City of Santa Ana and Caltrans standards, and will be City Council 20 – 44 5/16/2023
iv GMOC77011.2023
prepared at scale of 1” = 20’ horizontal and 1” = 4’ vertical for roadway profiles using MicroStation V8i version drafting software on a 24” x 36”, full-size sheet. Street improvement plans will entail horizontal features of proposed curb returns, curb ramps, curb and gutter, sidewalk, cross gutter, spandrels and other surface improvements within the limits of the project. Necessary adjustments to surface utility features will be identified and addressed with call outs and construction notes.
Improvements will be designed using City of Santa Ana Standard Plans, Caltrans Standard Plans, Standard Plans for Public Works Construction (SPPWC), and Public Right-of-Way Accessibility Guidelines (PROWAG). Deviations from applicable standards will be indicated on plans. Exceptions will require approval by the City.
Deliverables: Plans, electronic files in MicroStation V8I and PDF (final plans will be sealed and signed), and responses to previous review comments from the City Task 9 – Hydraulic/Hydrology Analysis
Our team will prepare a drainage report to address hydrology and hydraulics for the project site per Orange County Hydrology Manual and Orange County Local Drainage Manual requirements and will provide design recommendations. Modifications are intended to maintain existing drainage patterns and flows. Calculations will consist of comparing the pre- and post-project conditions at the site. Evaluation and recommendations are limited to the impacted portion of the storm drain within the project site. Catch basins will be incorporated into design, where necessary (i.e., to limit flooded width) and at low points.
Evaluation of the downstream or upstream existing storm drain system is not anticipated for this task.
Deliverables: Hydrology and Hydraulic Analysis and Drainage Report Task 10 – Water Quality
Kimley-Horn will develop a Water Quality Management Plan (WQMP) for the project in compliance with, and meeting the requirements of Order No. R8-2009-0030/NPDES No. CAS618030, of the Santa Ana Regional Water Quality Control Board (RWQCB). The WQMP will incorporate Low Impact Development (LID) Best Management Practices (BMP) to the Maximum Extent Practical (MEP). For example, the use of bioretention facilities within landscaped parkway areas will be in accordance with the United States Environmental Protection Agency (USEPA) Green Street standards. If traditional LID BMPs cannot be incorporated, appropriate proprietary BMPs will be selected to improve water quality. If proprietary items are needed, these will be indicated in compliance with the City’s adopted public contracting code.
Deliverables: WQMP
Task 11 – Storm Drain Plans
We will prepare storm drain plans showing proposed catch basins and lateral connections to the existing main lines. Catch basin sizing, inlet dimensions, and laterals pipe sizes will be determined as part of our analysis. Potential conflicts with existing utilities will be shown on profiles with approximate location of utilities, per the utility agencies readily available record drawings. Storm drain plans will be prepared at a scale of 1” = 20’ horizontal and 1” = 2’ vertical for profiles.
Deliverables: Plans, electronic files in Microstation V8I and PDF, and responses to previous review comments from the City
Task 12 – Traffic Evaluation
Kimley-Horn will evaluate appropriateness of signal phasing at project intersections. We will collect intersection peak hour traffic counts at the project intersection. If traffic counts cannot be collected due to the traffic conditions impacted by COVID-19, we will review/utilize available historical counts at the intersection. We will conduct a queueing analysis to determine left-turn pocket storage requirements City Council 20 – 45 5/16/2023
v GMOC77011.2023
along the design street approaches. We will provide a Queueing Summary Memorandum to document the results.
Deliverables: Traffic Report
Task 13 – Signing and Striping Plans
Kimley-Horn will prepare signing and striping plans within project limits. The signing and striping plan will be prepared with current City of Santa Ana and Caltrans standards, and will be prepared at scale of 1” = 40’ using MicroStation V8i version drafting software on a 24” x 36”, full-size sheet.
Deliverables: Plans, electronic files in MicroStation V8I and PDF (final plans will be sealed and signed), and responses to previous review comments from the City Task 14 – Traffic Signal Modification Plans
Kimley-Horn will prepare a traffic signal modification plan at the project intersection. Plans at a minimum will show pole schedule, conductor schedule, phase diagram, pole location detail, general notes, and construction notes. The traffic signal modification plan will be prepared in accordance with current City of Santa Ana and Caltrans standards and will be prepared at a scale of 1” = 20’ on a 24” x 36”, full- size sheet using MicroStation V8i version drafting software.
Deliverables: Plans, electronic files in MicroStation V8I and PDF (final plans will be sealed and signed), and responses to previous review comments from the City Task 15 – Street Light and Electrical Plans
Kimley-Horn will prepare street light plans within project limits. We will conduct voltage drop calculations to determine the wiring sizes. We anticipate we will need to connect to existing service locations along the corridor. New service point locations may be necessary. Coordination with Southern California Edison to determine new and existing service points to be used will be a part of this task. We will provide a photometric analysis to determine required illumination for the corridor. The street light plans will be prepared on at a scale of 1” = 20’ horizontal on 24” x 36” full-size sheets. Decorative street lighting fixtures are excluded from this scope of services.
Deliverables: Plans, electronic files in Microstation V8I and PDF (final Plans will be sealed and signed), responses to previous review comments from the City
Task 16 – Landscape and Irrigation Plans
The Kimley-Horn team will prepare landscape and irrigation plans for the proposed medians, parkways, and open spaces within the project limits. These plans will be consistent with the City’s Standards and General Plan; the City’s Scenic Corridor Elements; the City’s Urban Design Elements; and California’s Water Efficient Landscape Ordinance. The plans will consider City maintenance when developing the design. We also will provide landscape design for private property landscaped areas impacted by street improvements. Landscape and irrigation plans will be prepared at a scale of 1” = 20’ horizontal.
Deliverables: Plans, electronic files in Microstation V8I and PDF (final plans will be sealed and signed), and responses to previous review comments from the City Task 17 – Opinion of Probable Construction Cost
Kimley-Horn will prepare an opinion of probable construction cost, using Microsoft Excel, for verification of project budget and assistance during the contractor’s bidding process. Measurement of units will be contained in the specifications with additional detail for lump sum items as necessary. Unit prices will be derived from current bid information on similar work within the area. Backup information will be submitted along with the estimate if requested for City record and concurrence.
City Council 20 – 46 5/16/2023
vi GMOC77011.2023
The City is specifically cautioned that unit prices for construction have been and remain unpredictable and escalating and we advise that the City consider contingencies and engage in independent contractor pricing exercises. Consultant will exercise reasonable efforts to overcome the challenges presented by current circumstances.
Deliverables: Opinion of Probable Construction Costs, electronic files in PDF Task 18 – Specifications
Kimley-Horn will prepare technical specifications based upon the latest Special Provisions boilerplate supplied by the City. Bid items required by the plans or otherwise needed to accomplish project construction will be thoroughly described in the General Provisions and included in the contractor’s bid list. Technical provisions will contain adequate detail in coordination with the plans and will reference the Caltrans or other appropriate specifications.
Deliverables: Specifications, electronic files in PDF (final Specifications will be sealed and signed) Task 19 – Potholing
The Kimley-Horn team will provide vacuum excavation potholes to assist in identifying utilities where conflicts may exist with existing utilities. Potholing information will be used to identify potential conflicts with proposed roadway improvements. Additional potholes, if needed, will be an optional item per each pothole. Once the utility data has been collected, the pothole will be restored to its previous condition using native backfill and the appropriate surface restoration materials. We assume traffic control for potholing will be based on the WATCH manual. Preparation of traffic control plans is excluded from this task.
Deliverables: Potholing Report
Task 20 – Bid Support
Kimley-Horn will provide services during the bid stage by attending a pre-bid meeting and responding in writing to requests for clarifications. We will assist the City in the issuance of Addenda to the bid package. Other design changes, such as those for the contractor’s preference, are not included in this scope. Changes in the overall design concept are not accounted for in this scope.
Deliverables: Responses to RFIs
Task 21 – Construction Support
Kimley-Horn will assist the City during the construction period by attending meetings, answering contractor’s RFIs, reviewing submittals, reviewing shop drawings, conducting field observations and preparing addendums and clarifications. This also includes assisting in interpretation of bid documents, review of change orders and review of changed conditions in the field. We will prepare record drawings by updating the approved design drawings based on one set of redline markups provided by the contractor, project inspector or City staff. Independent verification of as-built drawings is not included in this scope. Significant deviations from the original design documents are not accounted for in this scope.
The purpose of the record drawings is to create a deliverable that will represent the built condition for the City’s records as recorded by the contractor.
The Kimley-Horn team has no control over the contractor’s or construction manager’s means, methods, techniques, sequence, schedule, and other activities. Kimley-Horn will provide its services during construction on a time and materials basis, and will notify the client prior to exceeding the budgets stated herein.
Deliverables: Responses to RFIs, contractor submittals, design revisions for Addenda and Record Drawings - One hardcopy and one electronic file (PDF format and MicroStation V8I) City Council 20 – 47 5/16/2023
vii GMOC77011.2023
Schedule
Tasks and durations shown on the Sample Schedule are provided for proposal purposes only. Nature of tasks and duration will vary for each individual task order and its corresponding schedule or as requested by the City.
City Council 20 – 48 5/16/2023
ix GMOC77011.2023
4. Certifications
City Council 20 – 49 5/16/2023
x GMOC77011.2023
City Council 20 – 50 5/16/2023
xi GMOC77011.2023
City Council 20 – 51 5/16/2023
xii GMOC77011.2023
City Council 20 – 52 5/16/2023
Contact
Othman Elmezain, P.E.
[email protected]
714.705.1387
1100 W Town & Country Road
Suite 700, Orange, CA
92868
www.kimley-horn.com
City Council 20 – 53 5/16/2023
EXHIBIT C
COMPENSATION
Consultant’s Fee Proposal including hourly rates if applicable City Council 20 – 54 5/16/2023
1 GMOC77011.2023
Fee Proposal Cover Letter
March 14, 2023
Sean Thomas, Project Manager
City of Santa Ana
Public Works Agency; M-36
20 Civic Center Plaza, Ross Annex
Santa Ana, CA 92701
RE: Fee Proposal for On-Call Engineering Services (RFP No. 23-030) Dear Mr. Thomas and Members of the Selection Committee:
Per the City’s RFP, we have provided our fee proposal under this separate cover. Our enclosed fee proposal includes Kimley-Horn’s hourly rates and our subconsultants’ costs and hourly rates. We welcome the opportunity to discuss our fees with the City and are flexible to adjustments and refinements as necessary to better accommodate your needs.
Thank you for your consideration. Should you have any questions regarding our fee proposal, please reach out to our project manager, Othman Elmezain, P.E., at 714.705.1387 or by email at [email protected].
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
Othman Elmezain, P.E. Darren Adrian, P.E.*
Project Manager Contract Manager/Senior Vice President
*As Senior Vice President, Darren Adrian is authorized to make legally binding commitments for KimleyHorn. 1100 Town and Country Road
Suite 700
Orange, CA 92868
TEL: 714.939.1030
City Council 20 – 55 5/16/2023
kimley-horn.com 1100 W Town & Country Road, Suite 700, Orange, CA 92868 714-939-1030 BR00PUSTD.A.6302024
Kimley-Horn and Associates, Inc.
____________________________________
Hourly Labor Rate Schedule
Classification Rate
Analyst I $120 - $160
Analyst II $160 - $195
Professional $195 - $235
Senior Professional I $235 - $310
Senior Professional II $310 - $395
Senior Technical Support $155 - $285
Technical Support $95 - $155
Support Staff $85 - $135
Effective through June 30, 2024
Subject to annual adjustment thereafter, not to exceed 3% annually.
External Reimbursable Expenses will be charged at 10% mark-up, or per the Contract Sub-Consultants will be billed per the Contract
City Council 20 – 56 5/16/2023
EXHIBIT 2
CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND
TETRA TECH FOR ON-CALL ENGINEERING SERVICES
THIS AGREEMENT is made and entered into on this 16th day of May, 2023 by and between Tetra Tech (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A.
B.
C.
On February 21, 2023 the City issued a Request for Proposal No. 23-030, by which it desired to retain a Consultant having special skill and knowledge in the field of:
Professional Engineering Services on an on-call basis for the City’s Public Works Agency.
Consultant submitted a responsive proposal that was among those selected by the city.
Consultant represents that it is able and willing to provide such services described in the scope of work that was included in the RFP No. 23-030.
In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform the services that were described in the scope of work included in the RFP No. 23-030, during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in “Scope of Services - Exhibit A”, attached hereto and incorporated by reference, and as further described in Consultant’s Proposal, attached hereto an incorporated herein by this reference as “Consultant’s Proposal - Exhibit B”.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for actual services performed under this Agreement at the rates and charges identified in Consultant’s Fee Proposal, which is attached hereto and fully incorporated herein by this reference as “Compensation - Exhibit C”. Consultant is one of fifteen (15) separate consultants selected to provide services on an on-call basis under RFP 23-030. The total compensation for services provided by all consultants selected under RFP 23-030 shall not exceed the shared aggregate amount of $5,000,000.00 during the term of this Agreement, including any extension periods, as set forth in Section 3, below. b. Payment by City shall be made within forty-five (45) days following receipt of proper
invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. c. Notwithstanding any contrary terms contained within Consultant’s Fee Proposal, Consultant’s fees shall not exceed 3% annually over the term of this Agreement, including any extension periods, unless directly affected by Prevailing Wage laws.
3. TERM
This Agreement shall commence on May 16, 2023 and end on May 15, 2026, with the option for the City to grant up to a one, two-year extension, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
6. INSURANCE
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with
the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors.
a. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has secured all insurance required under this Section. b. Insurance coverage shall be at least as broad as:
(i) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
(ii) Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non-owned), with limit no less than $1,000,000 per accident for bodily injury and property damage.
(iii) Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
(iv) Professional Liability (Errors and Omissions) Insurance appropriates to the Consultant’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (v) If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. d. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
(i) Additional Insured Status. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations.
General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
(ii) Primary Coverage. For any claims related to this contract, the Consultant’s insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or selfinsurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it.
(iii)Notice of Cancellation. Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. (iv)Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
(v) Self-Insured Retentions. Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.
(vi)Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City. (vii) Claims Made Policies. If any of the required policies provide coverage on a claims-made basis:
• The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
• Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
• If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
(viii) Verification of Coverage. Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. (ix)Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.
(x) Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity
shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.
9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.
10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.
12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultant and/or contractors retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a.
b.
As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
Jennifer L. Hall
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-xx)
P.O. Box 1988
Santa Ana, California 92702
Fax:
To Consultant:
Tom Epperson
Vice President
Tetra Tech
17885 Von Karman Ave., Suite 500
Irvine, CA 92614
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
[signatures on following page]
SIGNATURE PAGE FOR CONSULTANT AGREEMENT BETWEEN CITY OF SANTA
ANA AND TETRA TECH FOR ON-CALL ENGINEERING SERVICES
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.
ATTEST: CITY OF SANTA ANA
JENNIFER L. HALL
City Clerk
KRISTINE RIDGE
City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
CONSULTANT:
TOM EPPERSON
Assistant City Attorney Vice President
RECOMMENDED FOR APPROVAL:
NABIL SABA
Executive Director
Public Works Agency
EXHIBIT A
SCOPE OF SERVICES
City Council 20 – 67 5/16/2023
City Council 20 – 68 5/16/2023
City Council 20 – 69 5/16/2023
City Council 20 – 70 5/16/2023
City Council 20 – 71 5/16/2023
City Council 20 – 72 5/16/2023
City Council 20 – 73 5/16/2023
City Council 20 – 74 5/16/2023
EXHIBIT B
CONSULTANT’S PROPOSAL
City Council 20 – 75 5/16/2023
PROPOSAL FOR
On-Call
Engineering
Services
RFP NO. 23-030
City Council 20 – 76 5/16/2023 MARCH 2023
TABLE OF
CONTENTS
1. STATEMENT OF QUALIFICATIONS
a. Cover Letter 1
b. Contract Agreement Statement 2
c. Firm and Team Experience
d. Understanding of Need
2 10
12 13
21 30
31 e. Willingness to Comply with Agreement Terms
f. References
2. SCOPE OF SERVICES AND SCHEDULE
3. FEE PROPOSAL
4. CERTIFICATIONS
APPENDIX: RESUMES
On-Call
Engineering
Services
City Council 20 – 77 5/16/2023
On-Call
Engineering
Services
1. Statement of
Qualifications
City Council 20 – 78 5/16/2023
1. STATEMENT OF QUALIFICATIONS
SECTION A Cover Letter
March 14, 2023
Sean Thomas
City of Santa Ana
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Reference: RFP No.: 23-030, On-Call Engineering Services Mr. Thomas,
Thank you for the opportunity to submit our Statement of Qualifications to provide On-Call Engineering Services. We value the relationship we have built with the City of Santa Ana through our past and currently ongoing projects. We are committed to providing the City with the same consistent, diligent, high-quality service that you expect and deserve, and have seen from Tetra Tech. Our project team is the right team to provide these On-Call Services for the following reasons:
Proven Expertise: Tetra Tech has been providing similar on-call engineering services for more than 35 clients in Southern California. Many of these clients are repeat clients as Tetra Tech has provided service and innovative solutions on-time and within budget. Our reputation as a leader in consulting engineering is validated by Top 10 ratings annually by Engineering News-Record. Tetra Tech consistently ranks among the top engineering firms. In 2022, Tetra Tech was rated No. 4 among the top 500 Design Firms nationwide.
Extensive City Water/Wastewater Design Experience: Members of our project team have completed more than 47 water/wastewater projects for the City since 1999. Our project team knows the City’s design requirements and standards, preferred materials, and operational preferences which will allow us to complete designs in the most cost-effective manner.
Local Staffing and In-house Capabilities: We are proud to be embedded with the local fabric of a community in which we live, work, and play. Although we can draw from a large pool of nationwide resources, our Irvine office has experienced staff ready to mobilize at a moment’s notice to meet the City’s needs. Tetra Tech can best serve the City on this on-call due to our ability to provide most of the key disciplines and services in-house, leading to an efficient and well-coordinated set of construction documents. We can self-perform the project planning, feasibility studies, surveying, environmental documentation, permitting, project design, bid support, construction support, and post-construction support tasks with top-notch professionals that have built expertise in civil works projects, City facilities, parks, and other related projects. This brings consistency and the ability to execute with no learning curve.
Dedication to the City: We believe our past 23-year relationship with the City shows our commitment to providing the City with high-quality service. We have been awarded repeat work with the City due to our quality and responsiveness as well as the trust formed with the City staff.
We assure you that the expertise, responsiveness, attention to detail, and commitment demonstrated on our previous work will be fully applied to this work. I certify that I have the authority to negotiate contracts on behalf of Tetra Tech, and I am authorized to make representations for our organization. Please feel free to contact me at (949) 809-5156, or [email protected], if you have further questions or requests for additional information.
Sincerely,
Tom Epperson, PE
Vice President
17885 Von Karman Ave., Suite 500, Irvine, CA 92614 | 949.809.5000 | tetratech.com City Council 20 – 79 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
SECTION B Contract Agreement Statement
Tetra Tech has reviewed the StandardAgreement provided as Attachment 2 in the Appendix of the City’s Request for Proposals, and has the ability to meet the contracting requirements and conditions.
SECTION C Firm and Team Experience
Since 1966, Tetra Tech has been addressing our clients’ most complex needs. Our mission is to be the premier worldwide consulting and engineering firm. At Tetra Tech, we seek clear sustainable solutions that improve the quality of life. We embrace safety and sustainability in our business and operations.
HISTORY OF THE COMPANY TETRA TECH BY THE
Tetra Tech has more than 27,000 employees worldwide. Established in NUMBE RS 1966 and incorporated in Delaware in 1988, Tetra Tech is a multi-national Corporation and a leading provider of specialized consulting engineering and management services that are complemented by our technical capabilities. The breadth of the Tetra Tech knowledge base encompasses research and development, security, information technology, technical planning, applied science, engineering and architectural design, surveying, construction management, operations, and maintenance.
54 550
offices
years in business worldwide
27,000 global NATIONAL RECOGNITION personnel
Tetra Tech consistently ranks among the top engineering firms annually according to Engineering News-Record. In the 2022, Tetra Tech was ranked: 300 local personnel
within local area
- No. 1 in Water for 19 consecutive years
- No. 1 in Treatment & Desalination
- No. 2 in Sewer & Waste
Services to the City of Santa Ana
- No. 4 in the Top 500 Design Firms $4.8M
CITY EXPERIENCE in contracts over 5 years
8 Tetra Tech
We believe our best relevant experience is the more than 71 projects that we have completed for the City of Santa Ana since 1999. We are confident that these past projects with the City will attest to our technical excellence, responsive staff and our complete understanding of the City’s facilities and processes. Our previous work for the City includes a wide range of Southern California Offices
engineering services, including storm drain retrofits, sidewalk improvements, active transportation design, pipelines, pump stations, reservoirs, wells, lift stations, flow control facilities, upgrading of the City’s water and wastewater facilities, mechanical, structural, electrical and instrumentation design, studies and miscellaneous support. During these projects, we have developed a working relationship with the City’s Public Works staff, Parks and Building Departments and Construction Management groups. Because of Tetra Tech’s large pool of talented engineers and scientists, we will be able to respond to the full spectrum of issues dealing with the City’s facilities. We believe that the City is our best reference for our performance and execution of our past contracts.
City of Santa Ana 2
City Council 20 – 80 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
ON-CALL ENGINEERING EXPERIENCE
Tetra Tech’s portfolio includes hundreds of projects
involving water and sewer infrastructure design and
rehabilitation, storm drain improvements, curb and
gutter replacements, sidewalks, transportation and
complete streets, bike paths, land surveying, and
mapping and legal descriptions. Through efficient
management and leadership, our professional staff are
currently providing similar engineering services on an
as-needed basis for more than 35 clients in Southern
California. Many of these clients are repeat clients
as Tetra Tech has provided responsive service and
innovative solutions on time and within budget. We
understand the privilege of on-call contracts and the
necessity to provide timely responses while maintaining schedules and budgets.
We believe our best relevant experience is the projects that we have completed as part of our past and ongoing
as-needed contracts with southern California clients.
We are confident these past projects will attest to
our technical excellence, responsible staff, and our
complete understanding of every aspect of an on-call
engineering services contract. As part of these on-call contracts, our projects have included a wide range
of engineering services including feasibility studies,
detailed design, plan review, design support during
construction, and construction management services.
Years
of
Service
Cumulative
Contract
Capacity
On-Call Engineering
Service Clients
West Bas in MWD 26
6 $13,800,000
$200,000
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Central Basin MWD
Moulton Niguel WD
City of Anaheim
21 8
$2,000,000
$500,000
■
■
■
Upper San Gabriel Valley MWD
City of Paramount
9 $800,000 ■
15 ■
9 $2,000,000
$2,300,000
$1,500,000
$1,000,000
$745,000
■ ■
San Diego County WA ■
City of Oceanside 5 ■
■
■ ■
■
■
■
■
■
■
■
■
■
■ City of Tustin 18
8 ■
Long Beach WD ■
■
■
City of Huntington Beach
Lo s Angeles County
City of Los Angeles BOS
City of Los Angeles DWP
City of Los Angeles BOE
City of Pasadena
8 $1,300,000
$3,125,000
Unlimited
$60,000,000
Unlimited
$1,500,000
Unlimited
$2,000,000
$150,000
■
■
■
■
■
11 8
■
■
■
■
■
■
■
■
■
■
■
■
15 25
3 ■ ■ ■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Pacific Gas & Electric
City of Buellton
9 ■
■
■
■
■
■
■
■
■
■
6 ■ ■ ■ ■ ■ ■ ■
■
■
■
City of San Luis Obis po
NAVFAC Southwes t
California Military Department
City of Santa Clarita
3 9 $15,000,000
$30,000,000
$50,000
10 3
■
■
■
■
■ ■
■ ■
City of Santa Ana 3
City Council 20 – 81 5/16/2023
On-Call Engineering Services
CIVIL ENGINEERING EXPERIENCE Lift Station Projects
For more than 15 years, members of our project team
have been involved in the design and/or construction
support services of more than 8 lift stations.
Tetra Tech’s experience in civil engineering design for public works stems from vast project experience in
Southern California over the past 54 years completing
projects for municipalities. We are familiar with design and construction constraints that are specific to the City of Santa Ana having completed nearly 50 task orders for the City in the past 5 years alone.
Flow Control Facility Projects
During the last 15 years, members of our project team
have been involved in the design and/or construction
support of more than 12 flow control facilities.
Our experience in civil design is relevant to the services requested in this contract in that the projects we have successfully delivered for public agencies include street design and widenings, intersection improvements,
signalization, drainage improvements, passive and
active parks, storm water quality and stormwater capture projects, utility improvement projects, and structural
design of bridges and facilities. This experience allows our staff to more effectively implement solutions that
are compatible with the goals of the City, including
budgeting, procurement, performance, and operation
and maintenance.
Reservoir Projects
Within the last 15 years, our team has been involved in the design and/or construction support of more than 60
water/recycled water reservoirs (steel and concrete).
The reservoir design projects utilize a combination
of our in-house structural and electrical teams along
with a geotechnical firm to present the best design
improvement to the client.
Water Quality and Disinfection Projects
During the last 15 years, our project team has
completed design of over 11 treatment (process/
membrane) facilities within Southern California, including design of disinfection facilities at over 10 well and/or reservoir facilities. With new PFAS regulation becoming increasingly required within the State of California, our engineers have become proficient in the design of the
latest treatment options available completing over 14
local design projects of PFOS, PFOA, TCE, TOC and
Perchlorate.
WATER/WASTEWATER EXPERIENCE
Pipeline Projects
During the last 15 years, members of our project team
have been involved in the design and/or construction
support of more than 300 miles of water and recycled
water pipelines. Tetra Tech deems pipeline projects
to be just as important as facility projects because
comprehensive research and design can mitigate field
issues. We believe we have a very proficient team that
executes these projects efficiently and successfully.
Structural Seismic Retrofits
Our in-house structural group has been responsible
for the structural analysis and design of water projects completed by Tetra Tech. This work has also included
numerous seismic retrofits throughout Southern
California. The seismic analysis includes a threedimensional finite element analysis, member stress analysis, and foundation stability assessment.
Sewer Relining or Rehabilitation Projects
For more than 15 years, members of our project team
have been involved in the design and/or construction
support services of more than 100,000 feet of relining
or rehabilitation of existing sewer mains. Tetra Tech
has extensive understanding of the temporary handling
of the sewage flow during the work as well as the
importance of detailing the bypass facilities within the construction plans and specifications.
Electrical and Controls
Our in-house electrical group has also supported the
projects done within the Irvine office, including utility, industrial, residential, commercial, governmental, and
military projects. Our teams work efficiently together to provide our clients with the most comprehensive design.
Pump Station/Well Projects
Within the last 15 years, our team has been involved in the design and/or construction support of more than 40
water/recycled water pump stations and 15 water wells.
We have developed a team, including a hydrogeological
engineer, that works efficiently and effectively together to provide our clients with the maximum capacity required.
Planning/Engineering Studies
For more than 15 years, members of our Project
Team have completed over 15 master plans and/or
hydraulic modeling, engineering studies within Southern California.
4 TETRA TECH
City Council 20 – 82 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
PIPELINE PROJECTS BY PROJECT TEAM
LENGTH
(FT)
DESIGN
COMPLETE CLIENT PROJECT NAME SIZE (IN)
POTABLE AND RECYCLED WATER (OVER 300 MILES IN LAST 15 YEARS) Moulton Niguel Water District
City of Downey
Crown Valley Main Replacement 9,600
7,000
12” ~Oct 2022
2021-Current
Current
Cole St, 5th St, Florence Ave, Samoline & Melva St
1951 Cohort Pipeline Replacement
8”-12”
Mesa Water District 22,100 6”-16”
La Palma Ave and Tustin Ave Water Main
Replacement at Railway Crossing City of Anaheim 600 12”-36” 2021 Golden State Water Company
City of Lakewood
Water Main Replacement (3 projects)
Water Main Replacement (Annual)
La Mirada Recycled Water Pipeline
Katella Ave. Water Main Replacement
Water Main Replacement (5 projects)
Phase IIB Package 3 RW
24,700
150,000
28,700
7,000
8”-12”
8”
2020 - 2021
2002 - 2019
Central Basin MWD 4”-20” 2018
12”-16”
8”-12’
4”-12”
4”-24”
8”-24”
10”-16”
City of Anaheim 2017
City of Santa Ana 50,000
20,000
127,700
5,300
2007 - 2017
2007 - 2017
2016
Upper San Gabriel Valley MWD
El Toro Water District
City of Newport Beach
Irvine Ranch Water District
Recycled Water Expansion
Newport Blvd. Water Main Replacement
Peters Canyon Channel Reuse Pipeline
2016
17,000 2016
SEWER RELINING, REHABILITATION AND REPLACEMENT
Moulton Niguel Water District
Moulton Niguel Water District
Crown Valley Force Main Replacement 9,400
16,000
3,600
25,500
5,200
3,700
4,900
3,000
3,000
12” Oct 2022
2020
2015
2013
2013
2013
2013
2009
2009
Regional Lift Station Force Main Replacement 24”
Orange County Sanitation District Gisler-Redhill 21”-33” 15” & 54”
8”-15”
Orange County Sanitation District SARI and Yorba Linda Spur Long Beach Water Department
City of Hawthorne
Orange/Del Amo/15th Street
Sewer Improvement Project 10” & 12”
12”-15”
14” & 18”
8” & 15”
City of Santa Ana Westminster Avenue & McFadden Sewer
Long Beach Water Department Broadway Phase 3 Relining
City of Buena Park Westminster Ave. and Beach Blvd. Siphon FLOW CONTROL FACILITIES (15 IN THE LAST 15 YEARS)
City of Santa Ana SA-7 Relocation 2021
2016
2016
2012
2012
2009
KSD Joint Venture
City of Santa Ana
Carlsbad Conveyance FCF
SA-4 and SA-5
Irvine Ranch Water District
Orange County WD
City of Anaheim
Relocation of Zone 1 FCF
Kraemer Basin Valve Vault
Sand Canyon PRS
PUMP STATION/WELLS/LIFT STATION/FACILITIES BY PROJECT TEAM
CLIENT PROJECT NAME DESIGN COMPLETE
PUMP STATIONS (OVER 27 IN THE LAST 15 YEARS)
Orange County Water District
Yorba Linda Water District
Irvine Ranch Water District
City of South Gate
Santiago Pump Station Modification 2022
2021
2021
2016
2016
Timber Ridge Booster Pump Station Replacement
Zone 8 to 9 Booster Pump Station
Elizabeth Booster Pump Station
Irvine Ranch Water District Peters Canyon Channel Revise Pump Facilities City of Santa Ana 5
City Council 20 – 83 5/16/2023
On-Call Engineering Services
PUMP STATION/WELLS/LIFT STATION/FACILITIES BY PROJECT TEAM DESIGN
COMPLETE CLIENT PROJECT NAME
Orange County Water District
Orange County Water District
City of Orange
Mid-Basin Injection Wells (4 Wells)
Burris Pump Station
2016
2015
New Santiago Booster Pump Station 2010
RESERVOIRS (OVER 60 IN THE LAST 15 YEARS)
Golden State Water Company
Montecito Water District
City of Tustin
Huntington Horn Reservoir 2022
2021
2019
2010
2008
Park Lane Reservoir
Simon Ranch Reservoir
Rawlings Reservoir
Nohl Canyon Rank
City of Tustin
City of Anaheim
WATER WELLS (OVER 23 IN THE LAST 15 YEARS)
City of Orange Well 29 and Well 28 2021
2019
2017
2016
2016
2013
2012
2011
City of Paramount Well 16
Orange County Water District
City of Orange
Mid Basin Injection Centennial Park
Well 27
City of South Gate Well 29
Irvine Ranch Water District
Irvine Ranch Water District
City of Paramount
Well 115 and 107 Replacement
Well 78 Replacement
Well 15
LIFT STATIONS (8 IN THE LAST 15 YEARS)
City of Santa Ana
City of Santa Ana
San Lorenzo Lift Station
Maxine Lift Station Bypass
2019
2014
WATER QUALITY/DISINFECTION AND SEISMIC RETROFITS BY PROJECT TEAM DESIGN
COMPLETE CLIENT PROJECT NAME
WATER QUALITY/DISINFECTION
Moulton Niguel Water District
City of Paramount
2018/19 Reservoir Management System
Well 16 Treatment Plant
2019 - 2020
2019
City of Lakewood Well 22 Treatment Facility 2015
Irvine Ranch Water District
City of Paramount
PDF Ammonia and Chlorine Mods
Chlorine Replacement at Wells 13 and 14
Nohl Tank Disinfection Modifications
2013
2012
City of Anaheim 2011
MEMBRANE TREATMENT
City of Oceanside Pure Water Oceanside Advanced Water Purification Facility Albert Robles Center for Water Recycling
Huntington Beach Seawater Desalination Plant
Well 21 and 22 Desalter
Current
WRD of Southern California 2019
Poseidon Resources 2013
Irvine Ranch Water District
SEISMIC RETROFIT/REHABILITATION
City of Santa Ana
2010
Walnut Reservoir Assessment and Evaluation
Reservoir Vulnerability Retrofits (6 Reservoirs)
Santa Ana Gap Reservoir Assessment
Hunting Horn Reservoir Assessment
2022
2022
2022
2021
2021
Montecito Water District
Orange County Water District
Golden State Water Company
City of Riverside Condition Assessment of 3 Reservoirs
6 TETRA TECH
City Council 20 – 84 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
RELEVANT CIVIL DESIGN / SURVEY EXPERIENCE
Lincoln Avenue Pedestrian Pathway, City of Santa
■ ■
■
■ ■ ■ ■ ■ An a
Firs t Street Pedestrian Improvements, City of Santa
An a ■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Bolivar Park Stormwater Capture, City of Lakewood ■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Culver Boulevard Realignment, Stormwater
Filtration and Retention, City of Culver City ■ ■
Albion Riverside Park, City of Los Ange le s ■
■
■
■
■
■
■
■
■
■
■
Garfield Avenue Complete Street Improvements,
City of South Gate
DTLA Arts District Pedestrian & Cyclist Safety
Ac tive Trans portation Project (ATP) 3, City of Los
Ange le s
■
■
■
■ ■ ■ ■ ■
Skid Row Neighborhood Topographic Surveys and
■
■
■
■
■
■
■
■
Construction Staking, City of Los Ange le s
Merced Avenue Greenway, City of South El Monte ■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Sixth Street Park, Arts, River, and Connectivity
(PARC), City of Los Ange le s ■
■
■
■
■
■
PG&E ADA Ramps, Pacific Gas and Electric ■
■
■
■
■
■
■
■
Vermont Avenue Stormwater Capture and Green
Streets, City of Los Ange le s ■
■
■
■
■
■
■
■
■
■
■
■
■
Shell Beach Streetscape, City of Pismo Beach
Boyle Heights Pedestrian Linkages Ac tive
Trans portation Project ( ATP 2), City of Los Ange le s Stormwater Parks Program (4 Parks), City of Los
Ange le s
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■ ■
■
■ ■
■
Bannock Avenue Green Street Des ign for
Waters hed Protection, City of San Diego
NAVFAC Southwes t Surveying and Mapping IDIQ,
US Na vy
Redondo Beach Upper Wa lkwa y, County of Los
Ange le s
■ ■
■
Pacoima Wash Mountain Bikeway, Mounta ins
Recreation Conservation Authority ■
■
■
■
■
■
■
■
Templeton to Atas cadero Multi-Us e Pathway,
County of San Luis Obispo ■
■
■ ■
■
Bonita School Road Bridge Replacement Survey,
TYLin International
City of Santa Ana 7
City Council 20 – 85 5/16/2023
On-Call Engineering Services
OUR TEAM
Tetra Tech has assembled our personnel based on individual strengths, technical skills, and experience working together. We tailored our team composition to fit specific scopes of work and provide the City with a team that is local, experienced, and seamlessly transitions into the roles required under each on-call task order. Below is our organization chart and a table summarizing our Project Team’s years of experience and percentage of time devoted to this contract may be found following this page. We have included resumes for the noted personnel in the Appendix.
8 TETRA TECH
City Council 20 – 86 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
S U M M A R Y O F E X P E R I E N C E A N D AVA I L A B I L I T Y NO. YEARS
EXPERIENCE
PERCENT OF
COMMITMENT TEAM MEMBER ROLE PROFESSIONAL REGISTRATION
Tom Epperson
Neha Gajjar
Justin Smith
Mark Bush
Project Director/Manager
Deputy Project Manager
Deputy Project Manager
QA/QC
42 31
10 28
RCE # 36399
RCE # 55574
RCE # 85736
RCE # 60477
30%
60%
60%
20%
Jason Fussel QA/QC 20 RCE # 70879, PLS # 9006, QSD/P # 20231, LEED AP, ENV SP 20% Erica Jenkins
Jaden Miller
Laurence Esguerra
Matt Vera
Task Manager
Design Engineer
Task Manager
Design Engineer
Task Manager
Design Engineer
Task Engineer
Design Engineer
Design Engineer
Design Engineer
Task Manager
Design Engineer
Task Manager
Design Engineer
Task Manager
Design Engineer
Task Manager
Design Engineer
Task Manager
Design Engineer
Task Manager
Task Manager
Design Engineer
Design Engineer
Design Engineer
Task Manager
Design Engineer
Task Manager
Task Manager
Task Manager
Task Manager
Task Manager
30 6
EIT # EX102020
RCE # 94354
30%
30%
30%
40%
40%
40%
30%
30%
30%
25%
30%
30%
25%
30%
30%
30%
75%
50%
50%
50%
50%
25%
30%
30%
50%
30%
30%
50%
30%
50%
30%
25%
20 9
RCE # 73803
RCE # 86663
Mike Tsoi 33
14 14
16 16
14 30
22 30
11 37
15 15
9 RCE # 53715
Erin Cabaňero
Amanda Taylor
Peter Yu
RCE # 89704
PE Chemical # 6700
RCE # 88056
Eric Yuen RCE # 75983 RSE # 6177
Mike Olsen RCE # 81944
Molly Mell RCE # 59104, ENV SP
Cory Heggtveit N/A
Mazen Kassar
Douglas Seaman
Ken Berard
REE # 15809
N/A
RCE # 45499
Adrian Lee RCE # 79032
Elva Pangilinan
Tyler Parra
RCE # 81113, ENV SP, CDT
RCE # 89535
Devin Newton
Bridget Elliott
Craig Ziel
22 19
17 20
11 8
RCE # 72952, QSD/P # 01054
RCE # 84723, LEED AP
RCE # 74743, QSD/P # 23344
RCE # C69347, PLS # 8925
RCE # 84829, PLS # 9718
RCE # 92018
Dan Helt
Eric Martin
Megan Hanrahan
Philip Nordhus
Peter Skopek
Fernando Cuenca
Jeff Atijera
5 EIT # 165170
35 15
23 38
27 29
46 RCE # 59242, RGE # 2635
RCE # 50097, RGE # 3128
RCE # 72039
Marcel Bodsky
Heath Pray
RA # 35520
N/A
Paula Fell N/A
Ken Kulonis RME # M27379
K E Y P E R S O N N E L
Mr. Epperson will be the primary point of contact for the City and will manage each on-call task order on behalf of Tetra Tech.
Tom has been working with the City for more than a decade and brings 41 years of professional experience in water, wastewater, and reclaimed water engineering. He has been responsible for the preparation of water, wastewater, and reclaimed water master plans, project design reports for various water, wastewater, and reclaimed water facilities, and the planning and design of water, wastewater, and reclaimed water
TOM EPPERSON, PE
Project Director/Manager
pipelines, along with pump stations and reservoirs. To m has completed the design, bidding, and construction management of more than 300 miles of water/reclaimed water/sewer mains, 40 water/reclaimed water pump stations, 15 well-head facilities, 12 sewer lift stations and 25 water/reclaimed water storage reservoirs throughout Southern California.
City of Santa Ana 9
City Council 20 – 87 5/16/2023
On-Call Engineering Services
K E Y P E R S O N N E L
Ms. Gajjar has more than
30 years of professional
experience providing project
management, planning, and
design of water transmission,
distribution, and storage
facilities projects. Neha
Mr. Smith brings extensive
knowledge in civil engineering
from his involvement in
a variety of municipal
projects of varying size NEHA GAJJAR, PE JUSTIN SMITH, PE and funding. His design experience includes parking
lot and roadway geometrics,
Deputy Project Deputy Project Manager Manager
has significant experience
preparing plans and specifications for water/sewer
mains, storm drains, pipelines, and has an intimate
understanding of these requirements for many
municipalities. Her responsibilities as engineering
lead include establishing design parameters,
planning activities to meet client needs and project
schedules, and managing required appropriate
technical resources required for each project.
pedestrian accessibility improvements, bike
trails, parks, construction and post-construction
stormwater BMPs, storm drain improvements
including hydrologic and hydraulic design, overall
utility plans, structural design, and grading activities varying from mass grading to final precise grading
plans.
Justin's relevant project experience includes his
role as project manager for the City of Santa Ana's
Lincoln Avenue Pedestrian Pathway, Downtown
Santa Ana Flood Reduction and Stormwater
Infiltration, First Street Pedestrian Improvements,
and First Street Slope Stabilization Projects.
Neha provides the added value of working with the
City of Santa Ana on the Washington Well Drilling
Phase 2, SA-1 Hydro-Generator Replacement, and
Crooke Reservoir and Pump Station Improvements
projects.
Mr. Bush has more than
27 years of professional
experience in water,
wastewater, and recycled water
engineering. He has been
Mr. Fussel has more than
20 years of engineering
experience that includes
work on both public and
private sector jobs. His
MARK BUSH, PE responsible for the completion main strength is leading complex multi-disciplinary
projects consisting of
JASON FUSSEL, PE
QA/QC of more than 100 miles of QA/QC
potable water, recycled water,
and sewer mains, 20 potable water and recycled
water pump station and well projects, and 14
potable and recycled water reservoirs. Mark brings
leadership, a strong work ethic, technical knowledge,
and dedication to client satisfaction to each and
every project.
teams of engineers and scientists. His relevant
project experience includes hydrology and
hydraulic studies in support of transportation
projects and bridge designs, street and storm
drain improvements and grading activities varying
from mass grading to final precise grading plans.
Jason is also experienced in stormwater analysis,
studies, design, preparation of specifications,
bid documents, cost estimates, and construction
support services, as well as conducting topographic
surveys, utility surveys, Record of Surveys, ALTA
surveys, and coordination of aerial topography.
Mark brings relevant program management
experience with the City on more than 26 water
services projects under Tetra Tech's current AsNeeded Engineering Services Contract.
Jason is currently overseeing Tetra Tech's oncall contract with the City to provide On-Call Stormwater Project Design Services.
10 TETRA TECH
City Council 20 – 88 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
SECTION D Understanding of Need
Our proposed team brings a record of distinguished, successful implementation and completion of engineering services for large- and small-scale public works projects. We pride ourselves in our ability to deliver high-caliber, award winning work. In 2016, our team was selected as the City of Lakewood External Service Provider of the Year for our work on the Bolivar Park Regional Stormwater Capture Project – a project that won the 2016 Environmental Business Journal Project Merit Award for Innovative Technology, the American Public Works Association (APWA) Southern California Chapter 2018 B.E.S.T. Award for Storm Water Quality, the California Stormwater Quality Association’s 2019 Outstanding Regional Stormwater BMP Implementation Project of the Year, and was featured in the February 2017 edition of Civil Engineering Magazine. Additionally, the Culver Boulevard Stormwater Infiltration and Realignment was awarded the 2021 American Public Works Association Southern California Chapter B.E.S.T. Award for Storm Water Quality Projects. These relevant projects included pump stations, conveyance pipelines, roadway work, civil design, and land surveying services that were all performed in-house by the Tetra Tech team.
Tetra Tech understands that
the City is seeking to retain civil
engineering consulting firms on an
as-needed basis, to provide the
necessary engineering services
and to meet City standards. For
specialized work that requires
a subconsultant, the prime
Tech is committing our top
project manager and most
experienced project engineers
to this contract to ensure that
this is accomplished. Our
team will be able to recognize
and anticipate problems and
be able to come to the City
with options and solutions in
a timely manner. Our core
principles establish how we
plan to partner with the City
to successfully complete your
projects:
consultant shall serve as an
administrative liaison between the
City and the subconsultant.
APPROACH
Tetra Tech has a strong history
of providing on-call engineering
services to the City of Santa Ana,
and our goal is to strengthen
this relationship through a
“teamworking and partnering”
approach. Our approach focuses
on open communication and
responsiveness while providing
Service: Tetra Tech puts its
clients first. We listen to and
better understand our clients’
needs and deliver costeffective solutions that meet
those needs. Our philosophy is
to “Do it Right.”
Value: Tetra Tech takes on
our clients’ problems as if they were our own. We
develop and implement real-world solutions that are
cost-effective, efficient, and practical.
fiscally responsible engineering services and
solutions to the City and community members of
Santa Ana. Tetra Tech has assembled a specialized
team of dedicated professionals and local experts to
best serve the City’s complete engineering needs,
while providing comprehensive coverage, support,
and management of the City’s various department
programs and tasks.
Excellence: Tetra Tech brings superior technical
capability, disciplined project management, and
excellence in safety and quality to all of our work.
Opportunity: Our people are our number one
asset. Our workforce is diverse and includes leading
experts in our fields. Our entrepreneurial nature and
commitment to success provides challenges and
opportunities.
Our basic approach to engineering support services
will be to provide the City with an experienced,
knowledgeable and enthusiastic staff dedicated to
providing the level of service the City desires. Tetra
City of Santa Ana 11
City Council 20 – 89 5/16/2023
On-Call Engineering Services
Our extensive experience with
similar projects will ensure
that the City will receive a
high level of service delivered
by qualified, knowledgeable
engineering professionals.
Highly meticulous and
coherent plans and
specifications greatly benefit
the project scope and project
implementation stages so that
each issue can receive proper
attention at the appropriate
point in the process. The intent
is to resolve each issue while
quantifying its impact on project
costs, schedule, and risks. A
detailed outline of our standard
task order approach is included
in Section 2 Scope of Services
and Schedule.
all project stakeholders, with
the largest benefit realized by
the Owner. Quality contract
documents clearly lead to
a larger number of bidders,
lower competitive bid prices
(due to increased competition,
the contractor has less to
assume and take the risk for, and a greater overall
comfort level in our design based on a long history
of successful projects), and lowest overall cost while
achieving a very high-quality end product (quality
contract documents mitigates the potential, and
impact of change orders, and sets forth a standard of
quality the contract must achieve).
PROJECT
MANAGEMENT
PROCEDURES
Successful on-call service contracts require a diverse
and highly talented team, made up of specific
engineering and design disciplines, as well as
responsible project management. No matter the task
that is being requested, each project requires:
• Delivering a project within budget and on schedule
• Coordinating with appropriate agency representatives
• Implementing a Quality Assurance/Quality Control
No two projects are the same, although many are
similar. The key is to utilize elements of work that
have been successful and can be appropriately
applied to your projects, continue to improve
construction efficiencies without lowering quality
based on contractor feedback, and maximize the
overall operational flexibility.
Plan to increase the excellence of the end product
• Teamwork development and meeting participation
PROJECT/COST CONTROL
For project development, Tetra Tech will use a
Project Management/Control System which we
have used successfully on numerous municipal
projects. The core of this system is a monthly Project
Management Report.
We feel the previous work that Tetra Tech has
completed on previous projects for the City are
examples of our quality product which has resulted
in a low overall cost for the City. We want to utilize
the experience gained from working on the previous
projects, and to continue providing the City with
exceptional services to assure that another project
is successfully completed to the satisfaction of the
City. It is this experience where Tetra Tech has truly
garnered the understanding and needs of the City
to support on the design and engineering services
below.
CRITICAL PATH METHOD (CPM)
SCHEDULES
Tetra Tech will approach the development of a
detailed work plan very seriously. The project team
will meet at project initiation to collectively determine the smaller work tasks required to complete the
major work activities as established in the Scope of
Services. A sequencing plan of these smaller work
tasks, using precedence format, will be developed
which in turn will determine the overall schedule.
The series of work tasks and resulting schedule
will be diagrammatically exhibited as a Critical Path
Method (CPM) flow chart. This flow chart, which
highlights the critical path, will be used to base our
determination of the intermediate project milestones.
TASK ORDER APPROACH
Every project has unique challenges and concerns
regardless of how similar it may be to previous
projects. To ensure the timely and efficient
completion of work, it is imperative to identify all
project specific issues during the development of
12 TETRA TECH
City Council 20 – 90 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
QUALITY ASSURANCE/QUALITY
CONTROL
Having an adequate amount and necessary type
of resources are critical to the success of a project.
Inadequate resources can result in project delays
and/or poor execution of required tasks. Tetra
Tech is ready to provide support to the City with
our experience and knowledge to quickly resolve
technical issues and challenges. The Tetra Tech team
can provide the specialized expertise and the depth
of resources necessary to meet or exceed the City’s
variable project requirements including providing the
following services:
At Tetra Tech, our methods and techniques for
Quality Control (QC) are employed in all phases
of work to ensure that the quality requirements are
fulfilled for our clients. Quality Assurance (QA) is
integral to our culture and processes and is ingrained
in each task to be properly implemented. Our Quality
Assurance has been responsible for driving down
the lead time for Project Delivery and reduces the
overall cost of the project by minimizing quality
checks, rework and agency delays. The Quality
Check process is a formalized step in the delivery
• Civil - Design
• Transportation/Traffic
process that requires all documents and deliverables • Structural to go through an independent review prior to release.
The goal is simple: ensure that the product meets
the expectations of the client and does not require
the City to review the deliverables. This goal keeps
rework down and achieves two primary goals:
reducing cost and time.
• Geotechnical
• Land Surveying
• Architectural
• Landscape Architectural and Irrigation
• Environmental/Planning Support
• Mechanical
• First, the QC Manager will conduct a formal review
of the deliverable highlighting all reviewed work and
redlining the set.
• Once the review is finished and verified that all redlines have been addressed, the Project Manager will review
the set to look for constructability and interdisciplinary issues.
• The final phase is a peer review to produce an
independent quality check prior to submittal. This
process fixes mistakes, verifies compliance with
design criteria and codes, and provides feedback to
the design team.
• Instrumentation and Control Systems
• Hydraulic modeling of the water distribution, storm
water, and sewer collection systems
• Evaluations, studies and recommendations related
to water wells, reservoirs, water treatment systems,
disinfection systems, pressure control systems, and
sewage lift stations,
• Electrical and industrial control systems evaluations, studies, drawings, documentation and recommendations
• Mapping Services
• Legal Description Preparations
• Construction Management Support • Furthermore, the process is audited to keep the managers accountable for following the quality check • Pavement Management process. • Special Engineering Studies/Reports/Compliance and Investigations
• Sustainable Infrastructure Services STAFFING WITH LOCAL
KNOWLEDGE AND DEPTH OF
TECHNICAL EXPERTISE • Right of Way Studies
Members of our project team are locally based and
are deeply invested in projects that will improve the
local community and provide beneficial public space.
SECTION E Willingness to Comply with
Agreement Terms
Tetra Tech has reviewed the StandardAgreement provided as Attachment 2 in the Appendix of the City’s Request for Proposals, and has the ability to meet the contracting requirements and conditions.
City of Santa Ana 13
City Council 20 – 91 5/16/2023
On-Call Engineering Services
SECTION F References
Tetra Tech is especially proud of our high level of repeat customers, which we attribute to our dedication and commitment to providing quality engineering services, as well as client satisfaction. In addition to our successfully completed projects for the City, we offer the references provided below. Each are familiar with the wide range of services we provide, and the key personnel on our team.
CLIENT REFERENCE SERVICES PROVIDED
Irvine Ranch Water District
15600 Sand Canyon Avenue Irvine, CA 949/453-5571
92618
Richard Mori, PE 8 Pipelines; 6 Pump Stations; 12
Well Equipping; 1 Reservoir; and 4
[email protected] Membrane Treatment Projects
Orange County Water District
18700 Ward Street, Fountain Valley,
CA 92708
6 Pipelines; 1 Vault Modification;
1 Pump Station; and 1 Well Injection
Project
Mike Markus, PE
714/378-3305
Moulton Niguel Water District
27500 La Paz Road
Laguna Niguel, CA 92677
Matt Collings, PE
949/425-3552
[email protected]
On-Call Services; 8 pipelines; 4 Meter
Projects; 6 Pump Station/1 Lift Station
Upgrades; 4 Studies; and 2 Reports
As-Needed Engineering; On-Call
Customer Development; 6 Pipelines;
6 Studies; 1 Pump Station; and 4
Pressure Reducing Valves/Chemicals
West Basin Municipal Water District Wendell Johnson, PE 17140 S. Avalon Blvd., Suite 210 310/217-2411
Carson, CA 90746 [email protected]
Dennis Cafferty, PE
949/837-7050
[email protected]
El Toro Water District
24251 Los Alisos Blvd.
Lake Forest, CA 92630
Recycled Water Distribution System
Expansion; and Oso Lift Station
Improvements
On-Call Services; 2 Well Projects; 4
Pipeline Projects; Valve Replacements;
Standard Upgrades; and 4 Water/
Wastewater Projects
Mesa Water District
1965 Placentia Avenue
Costa Mesa, CA 92627
Andrew Wiesner, PE
949/207-5458
[email protected]
City of Los Angeles, Bureau of
Engineering
1149 S. Broadway, Suite 630
Los Angeles, CA 90015
Bryan Powell, PE
213/485-5908
[email protected]
On-Call Engineering Design Services
Pacific Gas & Electric Company
77 Beale Street
San Francisco, CA 94177
Christopher Chu, PLS
415/265-4273
[email protected]
On-Call Civil Engineering and Land
Surveying Services
“The project team from Tetra Tech has been a delight to work with.
They have been on time, delivered on their promises, they have done everything we have asked them to do. I’d have to say that Tetra Tech is one of the best consultants that I’ve worked with in recent memory.” - Lisa Rapp, City of Lakewood, CA
14 TETRA TECH
City Council 20 – 92 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
SANTIAGO PUMP S TATION MODIFICATIONS , Santiago Creek, CA The original Santiago Pump Station was constructed
at the bottom of Bond Basin in 2002. Four submersible
pumps, each with their own MCC, were installed with
varying power and head capacities to accommodate
large fluctuations in water elevation. Soon after
commissioning the station, three of the four pumps
failed. In 2011, Orange County Water District (OCWD)
installed the floating pump station that is currently in use.
In 2019, the last functional submersible pump failed,
leaving OCWD without the ability to pump water from Client: Orange County Water District, Chris Olsen, 714.378.3232, [email protected]
Completed: 2022
Santiago Basin when the water elevation is above 240-
feet.
The OCWD identified two potential solutions to regain
pumping capacity when water elevations are above 240-feet: (1) Add two small pumps to the floating station and construct any necessary modifications to accommodate the additional pumps; or (2) Replace the existing larger pump drives with Variable Frequency Drives (VFD) and construct any additional necessary modifications that will allow the pumps to function within the configuration of the existing facilities.
The goal of this project was to provide a recommendation and prepare 65% plans on the optimal option to restore the ability to pump water from Santiago Basin. Preliminary evaluations of the options, included identifying the appropriate VFD and their potential costs; coordinating with the barge manufacturer for additional barge sections to accommodate the two smaller pumps; and working with the pump manufacturer to obtain potential costs for the purchase of two smaller pumps.
FLEMING ZONE 8 TANK AND ZONE 8 TO9 BOOSTER P UMP S TATION IMP ROVEMENTS , Orange County, CA
Irvine Ranch Water District (IRWD) provides potable
water supply service to the Santiago Area located in an unincorporated region of Orange County. This service
area includes four distinct sub-areas containing a
system of reservoirs and pump stations that solely rely on the existing 150,000-gallon steel Zone 8 Fleming
storage reservoir and the existing Zone 8 to 9 booster
pump station as the main source of water supply.
In 2017, IRWD completed an analysis and
Client: Irvine Ranch Water District, Richard
Mori, 949.453.5571, [email protected]
Completed: 2022
recommended improvements for the undersized
infrastructure and requirements for additional storage.
This project included several primary components,
including:
• Demolition of the existing reservoir and pump station • A new above ground 1.3 MG prestressed concrete reservoir • Replacement of the Zone 8 to 9 pump station with three 600 GPM pumps • A replacement storage building
• An RMS building with sodium hypochlorite/aqueous ammonia treatment • A 2,000-gallon diesel fuel storage tank
• Siting for electrical service, controls, and telemetry improvements City of Santa Ana 15
City Council 20 – 93 5/16/2023
On-Call Engineering Services
WELL NO. 29 WITH PFOS AND PFOA TREATMENT SYSTEMS, Orange, CA Tetra Tech provided engineering design services for the well drilling and well equipping of a potable water well in the City of Orange. The City’s Water Division operates a water distribution system including water mains, wells, pump stations, and reservoirs. The City pumps water from the groundwater basin through an existing well network
that includes 12 active wells and imports water from the Colorado River and Northern California as a secondary
source. Well No. 29 is proposed to enhance the reliability, efficiency, and redundancy of the City’s water system.
Currently, Well No. 8 and its supporting facilities were located within the existing site. The property was mostly Client: City of Orange, Sonny Tran,
714.288.2475, [email protected]
Completed: 2022
unpaved and small areas of asphalt around the well facilities. The Well No. 8 is to be destroyed and the new Well No. 29 and PFOS/PFOA treatment system constructed.
Well No. 29 will pump water to the 370 Zone and is expected to produce approximately 3,000 GPM. The PFOS/ PFOA treatment system shall be designed to treat approximately 3,500 to 4,500 GPM, which includes the total production of proposed Well No. 29 and existing Well No. 9, located 300 feet to the north. The well facilities include a wellhead enclosure, chlorination, and electrical building, with an external roll-up generator connection for backup power. The on-site piping includes piping from Well Nos. 9 and 29 to the treatment system and post treatment piping to the distribution system. The Water Division is to bid the well drilling phase and well equipping phase separately. The site includes building and landscaping design, paving, and fencing. Well drilling construction began in February 2021 and well equipping began after drilling was complete.
ROSETON PLANT IMPROVEMENTS, Artesia, CA
Golden State Water Company wants to add a 0.75 MG
welded steel reservoir, booster station, and backup power generator to the existing plant. Included with the work is the relocation of the Fe/Mn backwash tank and skid
mounted recycle pump, and relocation of the MCC for
Well No. 2. The existing facilities to remain include Well No. 1 and No. 2, the three bay chemical building, Fe/Mn treatment system, and SCE transformer if it is determined it is adequately sized for the proposed and existing
facilities. The booster pump station is to be comprised of four vertical turbine pumps each with a capacity of 1,000 GPM against system pressure (with assumed 75 hp
Client: Golden State Water Co., Joe Farah,
562.907.9200 x423, [email protected]
Completed: Current
motors). The new Welded Steel Reservoir (WSR) shall have a usable capacity of 0.75 MG, with a separate inlet and outlet. The WSR inlet will incorporate an altitude valve to control tank filling with system water. Desired WSR dimensions shall have a maximum external height of 30 feet, an overflow level equal to 26 feet, and a diameter of approximately 70 feet. The groundwater wells will discharge into the WSR following wellhead treatment.
Included in the design, will be improvements to fill the WSR from the distribution system via an altitude valve.
A backup power supply shall be included which shall comprise of a Cummins diesel powered generator with Tier 4 emissions, sound attenuation suitable for a residential neighborhood, a fuel capacity capable of allowing the generator to operate 72 hours at full load, and an automatic transfer switch (ATS). The generator shall be capable of operating: one groundwater well pump; four booster pumps; Fe/Mn treatment system; SCADA and plant controls; and ancillary power needs. The sizing of the generator, fuel capacity and ATS will be coordinated with Cummins. Electrical services include evaluation of the proposed loads and determination if the existing SCE service will be sufficient to accommodate improvements. 16 TETRA TECH
City Council 20 – 94 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
LINCOLN AVENUE P EDES TRIAN PATHWAY, Santa Ana, CA
Tetra Tech provided engineering, geotechnical,
environmental, permitting, landscaping, surveying
and construction support services for this active
transportation project. The project was funded in part
by ATP state grant funds. The pedestrian pathway
runs parallel with Lincoln Avenue west of the existing
railroad tracks. The improvements commence at the
intersection of Lincoln Avenue and Park Lane, continue
north between the back of the residential properties and the railroad tracks, and end at the existing Santiago Client: City of Santa Ana, Gilbert Castillo, Trail, under the railroad bridge that crosses Santiago
Creek. The improvements included a 12-foot pathway
and railroad-approved safety fencing, drought tolerant
landscaping, pedestrian lighting, and a trailhead to
identify the pathway.
714.647.5647, [email protected]
Completed: 2022
When the Lincoln and Fairhaven Avenue railroad crossing was closed permanently several years ago, pedestrian and bicyclist access was also removed. The closure now requires motorized and non-motorized users to travel an additional mile out of the way, causing a substantial impact for non-motorized users. The construction of the project provides active transportation continuity to the Santiago Trail, connects to the existing pedestrian pathway located along the east side of the railroad tracks, and enhances the aesthetics of the area. The connection to the eastern pedestrian pathway provides the ability to traverse to the south back to Fairhaven Avenue.
FIRST STREET PEDESTRIAN IMPROVEMENTS, Santa Ana, CA
Tetra Tech provided engineering, surveying and
construction support services for this sidewalk widening project funded by ATP state and federal grant funds. The project involved the widening of the existing sidewalks along a 1.2-mile portion of First Street between Flower Street and Standard Avenue in the City of Santa Ana.
In addition to the sidewalk improvements, the project
included retrofitting reconstructing drainage structures including catch basins and parkway drains and installing Green Streets Best Management Practices (BMPs)
to improve stormwater quality. Per the Water Quality
Management Plan (WQMP) that was prepared for the
project, proprietary flow-through filtration systems were Client: City of Santa Ana, Sean Thomas,
714.647-5655, [email protected]
Completed: 2022 (Design)
installed at select locations throughout the corridor. Due to the limited storm drain systems along the corridor, a BMP could not be installed for each drainage management area. Instead, BMPs were installed at locations throughout the corridor that had opportunities to connect the BMP outlet pipe to a nearby existing storm drain catch basin. These BMPs were oversized to treat the impacted project area runoff as well as additional offsite runoff, which is consistent with Section 2.7.2 of the Technical Guidance Document (TGD) that states “treatment of comingled off-site runoff may be used to off-set the inability to treat areas within the project for which significant constraints prevent the ability to provide treatment.
City of Santa Ana 17
City Council 20 – 95 5/16/2023
On-Call Engineering Services
BOLIVAR PARK STORMWATER CAP TURE, Lakewood, CA
Tetra Tech was contracted by the City of Lakewood to
evaluate two potential site locations for the development of the Lakewood Stormwater and Runoff Capture Project:
Mayfair Park site and the Bolivar Park site. Tetra Tech provided a Project Engineering Study Report (PESR) that represented 10% design completion level and described
the evaluation of the two sites with all site investigation, Client: City of Lakewood, Lisa Rapp,
562.866.9771, [email protected]
Completed: 2018
hydrology and hydraulic, and water quality data and
analyses to provide a recommendation for site selection.
The Bolivar Park project consisted of an air-inflated
rubber dam diversion system to redirect all urban runoff and stormwater runoff from the Del Amo channel through a pre-treatment system to remove trash, debris, and sediment. A pump station and drainage pipeline will then convey the water into a large, buried multi-chambered storage/infiltration facility. The stormwater collected in the underground reservoir will be treated and used to irrigate the park’s landscaped areas. The system will monitor the weather conditions and the facility through a secured cloud-based system. The goal of the project was to not only help the City comply with the metals Total Maximum Daily Loads (TMDLs), as presented in the Los Cerritos Channel Watershed Management Program, but also provide additional benefits such as revitalized park infrastructure and augmentation of local water supplies. As one of the first cities to receive stormwater funding to support Caltrans with stormwater compliance units, the success of this project serves as a model for other agencies to follow.
CULVE R BOULEVARD CORRIDOR REALIGNMENT PROJ ECT AND STORMWATER FILTRATION AND RETENTION PROJ ECT, Culver City, CA
Tetra Tech performed survey and civil engineering design services for two separate projects along Culver Boulevard, a median realignment project and a regional stormwater
capture project. At the heart of the realignment project is a newly constructed 58-foot wide raised landscape median, complete with buffered bicycle and pedestrian paths to
improve pedestrian and vehicular safety and mobility while mitigating traffic noise and nuisance impacts to nearby residents. Street improvements included the reconfiguration of existing traffic lanes, new and reconstructed landscape medians, traffic signal additions and modifications, newly designed bus stops, signal interconnects, new lighting, utility adjustments, relocation of existing catch basins, and the design of a parking lane with innovative buffer treatment to Client: City of Culver City, Hong Wang,
310.253.5604, [email protected]
Completed: 2019
separate it from the eastbound high-speed travel lanes on Culver Boulevard.
The regional stormwater capture project will maximize pollutant and stormwater capture by diverting dry and wetweather stormwater flows at a rate of up to 50 cubic-feet-per-second from two stormwater facility locations. Diverted stormwater flows are first sent to one of two pretreatment units to remove trash and sediments and then to a concrete underground storage facility capable of providing up to 8-acre-feet of storage. Stored water is pumped to the post-storage filtration system where it is polished for final pollutant removal before being returned to downstream storm drain channels and receiving waters. As an added benefit of this project, treated stormwater will be used to offset potable water irrigation demands on the newly constructed 58-foot-wide raised landscape median and at nearby Veterans Park.
18 TETRA TECH
City Council 20 – 96 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
ALBION RIVERS IDE PARK, Los Angeles, CA
Tetra Tech provided pre-design, design, and construction support services for the Albion Riverside Park Project, located adjacent to the Los Angeles River. The project
involved transforming a six-acre site, previously
used for dairy warehousing and distribution, into a
riverfront park and recreational facility that benefits nearby disadvantaged low-income neighborhoods.
This important water quality project is part of the City’s overall efforts through the Proposition O Bond Program
to improve water quality and reduce pollutant loads that are currently being conveyed to the rivers, lakes, and
oceans within the greater Los Angeles area.
Client: City of Los Angeles, John Saldin, 213-
485-5875, [email protected]
Completed: 2019
The overall project objective was to develop the project site and implement Low Impact Development (LID), Green Infrastructure, and Best Management Practice (BMP) measures to improve the water quality of stormwater prior to discharging into the Los Angeles River and ultimately into the Pacific Ocean. In addition to collecting, treating and infiltrating on-site runoff, the project diverts stormwater and dry weather flows from an existing storm drain. The diverted flows are then treated and infiltrated, or used within the park. The BMPs installed included bioretention facilities, bioswales, and pervious pavement subsurface infiltration areas. The remainder of the park was developed for recreational uses, educational purposes, and improved access along the river. Recreational amenities at the site included multi purpose athletic fields, walking paths, adult fitness zones, children’s play area, picnic area, a new parking lot with permeable paving, site landscaping and a plaza.
GARFIELD AVENUE COMP LETE STREET IMPROVEMENTS, South Gate, CA Tetra Tech is providing professional engineering design and construction support services for this complete
streets project for the City of South Gate. The scope of this project includes providing multi-modal pedestrian
and bicycle design treatments to this 2.5 mile stretch of heavily congested corridor. The project will provide ADA improvements to approximately 42 existing curb ramps
and an additional 10 newly constructed curb ramps.
Existing gaps will be closed within sidewalks to improve pedestrian mobility. Three new pedestrian activated Client: City of South Gate, Elias Saikaly, 323.563.9581, [email protected]
Completed: Current
push button signals with enhanced crosswalks will be
designed and constructed to further improve mobility.
Medians will be installed at strategic locations as a
safety counter measure, preventing dangerous vehicular
left-turn movements at congested locations. Class II and Class III bike lanes and routes will be designed throughout the corridor and a Class I bike path will be designed within an adjacent park, providing access from the corridor to the Los Angeles Bicycle Path located adjacent to the Los Angeles River. Medians will be landscaped, and roadway rehabilitation assessment will be performed to identify the most economical way to utilize City funds to improve roadway conditions within the corridor. The project has multiple funding sources, including Federal Active Transportation and State Highway Safety Improvement Project funds which must be administered separately.
City of Santa Ana 19
City Council 20 – 97 5/16/2023
On-Call Engineering Services
DOWNTOWN LOS ANGELES (DTLA) ARTS DISTRICT PEDESTRIAN & CYCLIST SAFETY AC TIVE TRANSPORTATION PROJ ECT (ATP) 3, Los Angeles, CA Tetra Tech provided survey and civil engineering design services for the DTLA Arts District Pedestrian and Cyclist Safety Active Transportation Project (ATP) 3. The project area was characterized by a complex street system of very long blocks with few safe crossing locations, complicated intersections, and very limited bike facilities that create mobility challenges for residents, workers and visitors to the district. Many of the streets lack sidewalks, or have very narrow sidewalks, since most streets were built to handle Client: City of Los Angeles, Gary Lam,
213.694.4329, [email protected]
Completed: Current
large freight trucks making deliveries and pick-ups at area factories and warehouses where long loading docks and
wide driveways take the place of sidewalks for pedestrians.
The project design provides pedestrian and cyclist
improvements including new cycle tracks, bike lanes, bike routes, new and widened sidewalks with curb extensions, new traffic-controlled intersections, a new shared street connecting to the new Sixth Street Viaduct Arts Plaza, as well as green street elements.
In order to accommodate the project's short design timeline, Tetra Tech surveyors deployed immediately and performed an UAV/UAS survey of the entire project area. This allowed a preliminary base file drawing to be created to facilitate the pre-design report phase. As the design of the project evolved Tetra Tech’s surveyors and designers worked on a plan to only survey the necessary areas of the project, and only to the detail needed. Many portions of the project needed only striping improvements for which the aerial acquired data was sufficient. Others required striping and lighting. For those surveyors used GPS to locate and ID surface evidence of utilities. For areas of ADA access and critical drainage, survey crews utilize robotic total station and terrestrial LiDAR to capture design accurate grades. Data from the various forms of acquisition was combined into a seamless looking base file drawing to support the final engineering design.
SKID ROW NEIGHBORHOOD TOPOGRAPHIC S URVEYS AND CONSTRUCTION STAKING, Los Angeles, CA
Tetra Tech provided surveying and construction staking
services for mobility improvements in the Skid Row
Neighborhood, Los Angeles. Tetra Tech surveyed
13 intersections in coordination with the Bureaus of
Engineering and Sanitation, as well as the Los Angeles
Police Department and subcontractors. Survey logistics
were complex while as many as three Tetra Tech crews
followed Bureau of Sanitation personnel and police
officers as they facilitated the temporary closure of
locations used by homeless residents. Crews focused
on conducting accurate and complete surveys with
special attention to crew and public safety and sensitivity Client: City of Los Angeles, Kenneth Tang,
213.847.6028, [email protected]
Completed: 2019
to homeless residents in the vicinity. Deliverables were created to meet the City’s standards and guidelines and for direct use and import by the City’s design staff. 20 TETRA TECH
City Council 20 – 98 5/16/2023
On-Call
Engineering
Services
2. Scope of Services
and Schedule
City Council 20 – 99 5/16/2023
2. SCOPE OF SERVICES AND SCHEDULE
A detailed scope of services and schedule will be provided when requested for specific projects or tasks issued under the on-call contract. The following section describes a typical scope of services that Tetra Tech has utilized with municipal agencies to successfully implement civil works projects.
TASK ORDER APPROACH person and a total cost for the entire Task Order.
Large Task Orders may require a comprehensive
project schedule, prepared using MS Project; smaller
task orders may require less formal schedules, which
may be conveyed to the City in writing via email.
Upon receipt of a Task Order Request from the City,
our proposed Project Manager, Tom Epperson will:
• Review the available information for the Task Order.
• Meet with the City of Santa Ana’s Project Manager and The draft proposal will be reviewed by our Quality the City of Santa Ana staff members (via teleconference Assurance Manager, Task Manager, and select team or in person) to discuss the intent of the project and members. clarify the nature of the work. Final Proposal and Work Plan: Tetra Tech will discuss the draft proposal internally, make the
necessary adjustments and submit our final
proposal. After the fully executed agreement
between the City of Santa Ana and Tetra Tech is in
place, the Project Manager will prepare a Work Plan.
• Meet with the Tetra Tech project team for selection
of the appropriate Task Manager and technical staff
resources for the particular assignment.
• Follow up meeting with the City of Santa Ana’s Project Manager to ensure expectations are well defined.
• The selected Task Order Team will assist in the The Work Plan is an internal Tetra Tech document preparation of the Task Order budget, goals and which will contain the scope of work, project team, schedule. schedule and budget for the project. The format of Data Research: Tetra Tech will determine the
availability of design drawings, calculations, reports, photographs, studies, etc., which are pertinent to the
completion of the Task Order. These documents will
be reviewed to determine their impact on the project
prior to a visit to the project site.
City of Santa Ana Coordination: A Manager will
meet with key personnel from the City of Santa Ana
in person to discuss the proposed work. A site visit
will be conducted at this time to determine actual site conditions, record pertinent measurements, and take
photographic records of the project site.
Draft Proposal: The Project Manager will prepare
a draft proposal which will define our understanding
of the proposed work, our approach to completing
the required work, the project team, the scope of the
proposed work, schedule, and fee. Fee estimates
for each Task Order will be prepared using a cost/
price modeling tool (CPM) which was developed by
Tetra Tech. The CPM is a spreadsheet that itemizes
each of the tasks required to complete the project,
the personnel required to complete each task and
the number of hours required by each person for
each task. In addition to providing a tabulation of the hours required to complete each task, the CPM also
reports the total number of hours required by each
21 TETRA TECH
City Council 20 – 100 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
the Work Plan will vary with the type and size of the
given task order. For small projects the Work Plan
may be a short memorandum which is distributed
by email to the members of the project team. No
internal kick-off meeting will be required for smaller
projects. For larger projects, the Work Plan will be
a comprehensive document which is distributed
and discussed at an internal kick-off meeting. The
kick-off meeting will include all key project team
members. The input of engineers and specialists of
other disciplines may be required in order to provide
comprehensive solutions to some of the tasks. Tetra
Tech has experienced staff in all required disciplines
who will address any situation that comes up.
However, to provide the City of Santa Ana with a
sense of our knowledge of project requirements for
the general types of projects expected under this
contract, we discuss our project understanding in the
next section.
DESIGN APPROACH AND
COORDINATION WITH THE CITY
The approach that Tetra Tech typically uses for
engineering design includes a preliminary design
phase and a final design phase. Prior to commencing
the preliminary design phase, Tetra Tech will lead
with support from the City a project kickoff meeting
to review the project in detail, discuss the project
approach, identify critical success factors, schedule,
budget and obtain project specific goals from the
City. During the preliminary design phase, the
Tetra Tech team will work toward understanding
the project and site location. The team will analyze
project design issues and base their design
recommendations to the City of Santa Ana on this
analysis. Lastly, the team will work with the City to
set a design course that will result in a 30% design
review package.
Task Order Authorization: Upon receipt of the notice
to proceed from the City of Santa Ana for a given
Task Order, Tetra Tech will schedule a project kickoff meeting or teleconference, update the Quality Control Plan (as necessary), and prepare a Health
and Safety Plan (if required).
Project Execution: The last and most important
component of the management process is to perform
the work. This component is not easily summarized
here because it is dependent on the type of work
required and the scope of work for each Task Order.
City of Santa Ana 22
City Council 20 – 101 5/16/2023
On-Call Engineering Services
After the City of Santa Ana completes their review of
the 30% design package, Tetra Tech will initiate the
final design phase. Tetra Tech will produce a 60%
design package, final Independent Design Review
(IDR) package, and then a Final design package.
The City will review each of these design packages,
and the Tetra Tech team will work closely with the
City to address comments, make adjustments,
and ultimately produce the final, approved, design
package.
design review meeting will focus on confirming the
project’s design meeting the goals and intent that
the City has for the project. The 60% review meeting
focuses on the constructability of the submitted
plans, specifications, estimate (PS&Es), geotechnical
report and other supporting reports and calculations.
The Final IDR design review meeting will ensure
that all City comments and concerns are addressed
prior to the design team finalizing the Final PS&E bid
package.
Design review meetings will be held after the 30%, Meetings will be attended at a location selected by the 60% and final IDR design level completion. The 30% City. Tetra Tech will prepare meeting minutes for each.
TECHNICAL APPROACH AND METHODOLOGY
Having an adequate amount and necessary type
of resources are critical to the success of a project.
Inadequate resources can result in project delays
and/or poor execution of required tasks. Tetra
Tech is ready to provide support to the City with
our experience and knowledge to quickly resolve
technical issues and challenges. The Tetra Tech
team can provide the specialized expertise and the
depth of resources necessary to meet or exceed the
City’s variable project requirements. The depth and
breadth of our team’s technical expertise is described
in the following sections.
DETAILED DESIGN
Field Investigations: Conducting thorough field
reviews on projects is another critical component
of cost-effective project management. Tetra Tech
believes very strongly in walking our projects in
the field throughout the base mapping and design
stages of a project to insure all design issues are
considered. This task can be particularly important
on the City’s future projects due to the variety
of conditions that exist within potential project
footprints. Therefore, we will conduct thorough field
23 TETRA TECH
City Council 20 – 102 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
reviews of all projects, whenever possible, in order to Each project will dictate the survey necessary and obtain relevant site information. the level of accuracy. For example at a minimum for a project that affects the design and construction of a roadway, such as a Green Street or Complete Street
Project, survey data will be collected with very high
levels of accuracy. This may include, on a project
specific basis, the survey of each intersection,
including curb returns (BCRs/ECRs) and 25-feet to
50-feet beyond, traffic signalization (controllers and
signal detector loops), utility information, detailed
information of existing curb ramps to verify ADA
compliance and all other visual features. Along
roadway corridors, 50-foot cross sections will be
collected with additional cross sections included as
directed by the engineering team, the City or at the
surveying team’s discretion. The corridor survey will
include locations where sags, uplifts, depressions,
deficiencies and other irregularities are present. Site features including pathways, sidewalks, roof and site
drainage features, red curbs, house numbers will
be noted, driveways, parking locations, and utility
features (valve covers, manholes, fire hydrants, utility poles, guy wires, etc.) will be collected. As needed
damaged pavements, sidewalks, curbs vaults or
other feature will be noted at the time of the survey.
Surveying Approach: Our cutting-edge surveyors
utilize the latest in ground survey equipment to
perform topographic, boundary, right-of-way, ALTA,
GIS data collection and control network surveys. All
survey work is performed under the supervision of a
Professional Land Surveyor, licensed in California.
Tetra Tech surveyors utilize a combination of
GPS and Robotic Total stations to perform most
traditional surveys. Additionally, technologies such as Unmanned Aerial Systems (UAS), Vehicle mounted
mobile LiDAR mapping, aerial photogrammetry and
LiDAR, and terrestrial LiDAR scanning are available
to supplement the City’s survey needs. These
technologies, combined with traditional techniques
can increase efficiency and accuracy, while reducing
staff exposure to dangerous situations.
Our licensed surveyors can assist the City with
all surveying and mapping needs, including the
following:
ꢀ Topographic surveying
ꢀ Boundary surveying
ꢀ GPS/LiDAR surveys
ꢀ GIS base mapping
ꢀ Right-of-way mapping
ꢀ A LTA surveying
Prior to the detailed design, the field survey will be
visually verified by the engineering team.
Utility Research and Coordination: The locations
of existing utilities on a project site are critically
important for facility design, any subsurface
investigations, or any earthwork during construction.
Tetra Tech will obtain and research all plans
ꢀ Construction staking
ꢀ As-built surveying
ꢀ Legal Description
showing the locations and sizes of all aboveground
and underground utility lines and appurtenances
within the proposed project area. Research will
include researching Prior Rights to clearly identify
parties responsible for any relocation of conflicting
utilities. Additionally, our coordination efforts will
include researching whether any future utilities
are proposed in the project area that may require
accommodation through the improved area. When
appropriate (particularly before any ground-disturbing
activities on site), we will employ geophysical survey
techniques, or Dig-Alert type services to physically
locate any subsurface utility lines. Tetra Tech will
perform a field review of all utility line locations and verify that the plotted or surveyed locations for all
existing lines shown on drawings are correct.
ꢀ Easement Preparation
ꢀ Lot Line Adjustments
ꢀ Tract Map and Final Map Review
ꢀ Control Survey
ꢀ Corner Records
ꢀ Aerial Survey
ꢀ Mobile mapping
ꢀ High Precision Scanning
City of Santa Ana 24
City Council 20 – 103 5/16/2023
On-Call Engineering Services
Tetra Tech will coordinate with the utility purveyors
to obtain concurrence on the relocation and/ or
protection strategies. In this way, we can avoid
piecemeal work or moving a utility twice. If the
relocation design is to be prepared by the utility
owner (e.g., SCE), we will monitor and track their
design progress with the schedule. We will employ
our proven methodology to notice, catalogue, plot,
track, and coordinate utility impacts. Tetra Tech will
develop accurate substructure and utility maps to be
used by the design team to avoid utility impacts or
surprises.
available information that could be used in the design
of the project.
Geotechnical Investigation and Potholing: Tetra
Tech proposes that a geotechnical field exploration
be conducted at the proposed site to characterize
the site conditions and support analysis and design
of the proposed pipelines, lift/pump stations,
facilities, wells, pavement improvements, bike paths,
medians, landscaping improvements, and vegetated
bioswale improvements as necessary to ensure
proper design of the proposed project. During the
field investigations, the team will coordinate with
Utilizing USA Dig Alert’s website, a comprehensive Underground Service Alert and a private utility locator utility matrix and contact log will be developed, which may be utilized prior to performing soil borings.
Tetra Tech will use to request utility atlas information and document correspondence with each purveyor
The team wil provide traffic control in accordance
with the WATCH manual. Monitoring of all samples
with regards to responses received and as necessary with a photoinization detector (PID) may be utilized when a utility company requests to review the design to determine samples selected for environmental plans. sampling. The team will backfill borings with cementbentonite upon completion and patched to match existing surfaces, as needed and collect all cuttings
in drums.
Research: Tetra Tech will seek to obtain and review
all available documents for a current or proposed
project, unless directed otherwise by the City of
Santa Ana that the City has information readily
available. Information of interest will include existing reports, studies, design plans, as-built plans and
documents, benchmarks, centerline ties, aerial
surveys and mapping, and any other pertinent and
Potholing will be performed in the immediate area of
any pavement repair and reconstruction and spaced
evenly throughout the project. The spacing of the
potholing will also be based on visual changes of
site conditions, as-built data and other research data
to ensure that the existing pavement and subgrade
sections are properly characterized. The collected
data from the potholes will be used to determine
design and recommend pavement section and repair
methods to meet a 20-year life expectancy.
Design and Drafting Services: Tetra Tech can
provide staffing to assist the City of Santa Ana with
a variety of services and design disciplines as needs
arise. Our staff can assist the City of Santa Ana with
plan review, engineering analysis and research,
drawing preparation, construction observation, and
special inspection. Tetra Tech has highly qualified
engineers who will supplement City of Santa Ana
staff under the direct supervision of the City of Santa Ana. There would be little or no learning curve since
Tetra Tech can provide the City with experienced
and credentialed personnel to meet their needs;
individuals who can “hit the ground running” on a
moment’s notice. Tetra Tech’s staff can become an
extension and integral part of the City of Santa Ana’s
design staff.
25 TETRA TECH
City Council 20 – 104 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
Conceptual Green Street with Subsurface Infiltration Gallery Our team of qualified engineers provide expertise in
a variety of disciplines and can support the City in
a range of capacities. These personnel are skilled
and experienced in the preparation of engineering
designs and analyses, and the provision of plans,
specifications, as-built drawings and records. We can
also provide personnel experienced with construction
monitoring as well as the preparation of construction
documents.
implementing the recommendations provided in
these types of reports, even when prepared by other
agencies or design professionals.
Tetra Tech has also participated in the preparation
of numerous technical reports and studies on pilot
testing, alternative analysis, and water master plans
(including some with recycled water components).
Plans: Our construction drawings production
includes extensive internal quality control for all
design elements, including adherence to the City
of Santa Ana standards. We always ensure that
proper coordination of plans and specifications are
completed before each submittal. The project team is
experienced and knowledgeable with the codes and
design criteria that will govern both the conceptual
and final design plans for a project. We are well
versed in the design manuals and requirements
established by the City of Santa Ana, Orange County,
the Regional Water Quality Control Board (RWQCB),
AASHTO, Manual on Uniform Traffic Control Devices
(MUTCD), California Building Code (CBC), Caltrans,
and the Standard Specifications for Public Works
Construction (SSPWC).
Project Engineering Design and Analysis:
When analyzing and performing designs for capital
improvement projects it is our goal to find the
greatest possible public benefit. This includes finding multipurpose solutions that incorporate effective
water resource management, improved water quality,
and enhanced operational flexibility. Our experience
supports our ability to find creative, non-traditional
solutions, if necessary, to meet project requirements.
Our team will focus our design on meeting all project
code, permit and regulatory requirements. We fully
understand that the City has its own set of design
standards. As an extension of the City of Santa Ana
staff, our team will fully comply with and follow these standards.
Specifications: Technical specifications include
the City’s boilerplate general conditions and
requirements of the construction, detailed
requirements for the work to be performed, and
requirements for the materials to be used in
construction.
Reports: Tetra Tech has a broad range of
experience preparing feasibility, evaluation and
analysis, and conceptual studies for various Public
Water Agencies.
Tetra Tech’s reports will be prepared in accordance
with the City standards and submitted with adequate
time for review and approval by the City of Santa
Ana staff. Almost every project we complete begins
with a detailed preliminary design and/or conceptual
design report. Our team is well versed in preparing
all manner of reports, and is experienced with
Tetra Tech will make certain that specifications
conform to the requirements set forth by the City,
the Standard Specifications for Public Works
Construction (Green Book), Caltrans and any other
applicable general conditions.
City of Santa Ana 26
City Council 20 – 105 5/16/2023
On-Call Engineering Services
Cost Estimates: Accurate and well-defined cost
estimates are critical to the success of every project
to ensure that each element of the project is well
defined, properly funded throughout the construction
phase, and that proper contingencies have been
applied to account for unanticipated changes in
design and scope during the construction phase.
Our design staff and construction cost estimators
specialize in providing accurate construction cost
estimates from the initial programming phase
through the detailed design and construction phases.
We understand the importance of preparing accurate
life-cycle cost estimates for various alternatives.
In preparing the cost estimates, we consider the
local market conditions, prevailing wage rates,
construction equipment rates, site accessibility, and
any associated risk factors that might impact the
project budget.
not applicable to the nature of the work. When
necessary, additional deliverables may include:
• Detailed Response to Comment Matrix
• Utility Matrix
• Enlarged ADA Curb Ramp Details
• Corner Records
• Easement Documents
• Hydrology and Hydraulics Report
• Earthwork Calculations
Permitting and Agency Approval: Tetra Tech
has significant permitting and agency approval
experience that will benefit the City. Where
applicable, Tetra Tech will coordinate with Authorities having jurisdiction (AHJ) to assist the City in
procuring job-specific permits and authorizations.
Tetra Tech will prepare Water
Quality Management Plans
(WQMP), Storm Water Pollution
Prevention Plans (SWPPP) and
Erosion Control Plans, prepare
Our team will prepare quantities
and estimates per City
standards, utilizing RS Means
cost estimating data base and
The project team
is experienced and and submit encroachment
software, recent City bid data,
and our own current pricing
data base to validate unit costs.
A Class “O”, or parametric
cost estimate, will be prepared
knowledgeable with
the codes and design
criteria that will govern
both the conceptual and permit fees.
final design plans for a
permit applications to Caltrans,
and coordinate permit approval
with applicable agencies. It is
assumed the City will pay all
at the pre-design phase to
validate project programming. Water Quality Management
Plans and Stormwater Pollution
Prevention Plans (SWPPP):
Tetra Tech’s Qualified SWPPP
Developer (QSD) can prepare
During the detailed design
phase, we will prepare a Class project.
“C” cost estimate (design
level submissions) which will
a Water Quality Management Plan (WQMP), and
a SWPPP for all construction activities. WQMPs/
SWPPPs will be prepared to meet the requirements
of the State’s General Permit for Stormwater
Discharges Associated with Construction Activities;
2012-0006-DWQ and will follow the California
Stormwater Quality Association’s template. We are
also available to provide support from our Qualified
SWPPP Practitioners (QSPs) to implement the
SWPPP during the construction phase of the project.
It is assumed the City will be responsible for the filing of the Notice of Intent (NOI), Notice of Termination
(NOT), and data input into the Stormwater Multi
Application Reporting & Tracking System (SMARTS).
It is assumed that all registration fees will be paid by the City.
include much greater detail, take offs, and pay
item descriptions, which will then be updated to a
Class B estimate at 60% design, and updated to a
Class A estimate at Final IDR design completion.
Contingencies will be applied at industry standard
levels for each of the various cost classes.
Construction Documents and Reports: Our
engineers and managers fully understand the
importance of coordinating engineering activities.
Our team will work closely throughout the project with
the City of Santa Ana staff and stakeholders. We will
also provide coordination with various governmental
agencies and private individuals, as requested.
Deliverables will be dependent on the specific project
and will clearly identified in the approved Work Plan
for each Task Order. At a minimum the deliverables
listed in the RFP, unless they are specifically
27 TETRA TECH
City Council 20 – 106 5/16/2023
PROPOSAL FOR
RFP NO.: 23-030
Caltrans Local Assistance: For state and federally
funded projects, Tetra Tech will assist the City
with the completion of the necessary reporting
forms as required by Caltrans Local Assistance
Procedure Manual. Tetra Tech understands the
regulatory framework and relationships from similar
assignments which have required coordination with
Federal, State, and Local Agencies representatives,
as well as a thorough knowledge of associate
regulations and guidelines related to legal
proposed contract language exceptions during the
construction contractor selection process. At the
conclusion of the process, Tetra Tech will provide
the City of Santa Ana with our recommendation for
award.
Pre-Bid Meeting Attendance: Members of our team
will attend City-led pre-bid meetings at the City’s
designated location and, as applicable, attend/lead
a job walk of the project site to assist the City in
providing general and detailed project background
and answer questions raised by potential bidders
that are in attendance.
requirements, environmental compliance, permitting
and local codes and ordinances.
Regulatory Agencies: Tetra Tech is familiar and
has successfully completed projects within areas
under jurisdiction of the US Army Corps of Engineers
(ACOE) Regional Water Quality Control Board
(RWQCB) and California Department of Fish and
Game (CDFG) 1602. Projects that would involve
work within these areas may require a 404 permit
from the ACOE or a 401 Water Quality Certification.
Assist with RFIs Addendum and Technical
Related Issues: Bidder related questions and RFIs
that arise during the bid phase will be submitted to
the City and forwarded to the Tetra Tech team. Our
team will prepare answers to these questions and
other RFIs for distribution by the City. As necessary,
Tetra Tech will prepare addendum to modify the
existing bid documents, construction drawings and
specifications for distribution to bidders by the City. BID AND AWARD PHASE Bid Evaluation: Bid evaluation is of key importance
to avoid a bid protest by the unsuccessful bidder.
Upon receipt of bids at the City’s designated
location, Tetra Tech will carefully evaluate each bid
received to ensure that the lowest bidder is also the
responsive and responsible bidder. The review will
Bid Phase Support: If needed during the bid
phase, Tetra Tech will provide bid support services
to the City. Tetra Tech will attend pre-bid meetings,
respond to requests for information (RFI’s), prepare
addendum as required to modify bid documents,
assist in the review of bids, bid qualifications, and
City of Santa Ana 28
City Council 20 – 107 5/16/2023
On-Call Engineering Services
be done to a level to verify that the bids satisfy the Our team of construction management personnel are bid requirements. Following this review, our team will qualified professionals who can effectively manage make an award recommendation to the City. the technical complexities of today’s construction projects. Our construction management philosophy
is to keep the project on schedule and on budget
through communication and project controls.
Review of Construction Contracts: Clearly the
review of construction contracts and the evaluation of
construction project bids is of key importance for the
management of construction project costs. Tetra Tech As-Built Records: Upon completion of a will assist in the review of bids, bid qualifications,
and proposed contract language exceptions during
the construction contractor selection process. At the
construction contract, Tetra Tech will prepare record
drawings by updating the original project plan sheets
showing changes that occurred during bidding and
conclusion of the process, Tetra Tech will provide the construction. Record drawings will be prepared by City with our recommendation for award. transferring the updates from red marked plans received from the City. The record drawings will be
completed in the project AutoCAD files. “Record
Drawing” cells will be included on each plan sheet
and updates will be clouded to provide distinction
from the original design.
CONSTRUCTION ENGINEERING
SUPPORT SERVICES
If needed, during construction, Tetra Tech will
provide engineering services including review
of RFIs (Request for Information), shop drawing
review, material certifications, review of contractor
substitutions, schedule reviews and assistance with
change orders.
PROJECT MANAGEMENT TEAM’S
QUALIFICATION & EXPERIENCE
NARRATIVE
For this contract, we are proposing our water,
wastewater and civil design team with recent
experience working with municipalities under on-call
contracts on a variety of water, wastewater and civil
design task orders. Our proposed Project Manager,
Tom Epperson, will be supported by a deep and
strong team of civil engineers and designers, all of
whom are available and capable to successfully
deliver task orders.
Tetra Tech’s team of engineers understand the
importance of services during construction and is
committed to providing timely and accurate review
of all submittals. We pride ourselves in being able
to solve complex field issues quickly and find costeffective solutions to keep the project moving ahead without delays and cost overruns.
Submittals for Project Design by Contractor
Personnel: Our team will review project design
submittals provided by the contractor. They will
be reviewed for conformance with the contract
documents. Substitutions will be carefully reviewed
to determine if they are equal to the specified
materials. We will also review any substitution to see
if it changes any other part of the existing design.
Our analysis will include our opinion of the benefit to the City of Santa Ana of the proposed substitution
and validity of any proposed cost savings. We will
keep in mind the overall desires of the City of Santa
Ana operating staff in our analysis.
Tom and the leadership team’s experience providing
oversight and management of multiple ongoing
projects under on-call contracts along with the Tetra
Tech team, virtually eliminates learning curves
associated with team’s that have multiple firm
subconsultants. It provides the City of Santa Ana with
a team that will be proactive, understands the issues
and challenges associated with contracts of this
nature and who can hit the ground running on any
task order needs.
Our proximity to the City further solidifies our
investment in the City and this contract. We are in
local and have been for more than 54 years.
Review of Technical Submittals: Our project
team will review contractor technical submittals
including, but not limited to, shop drawings, material
certifications, material samples and schedules,
as requested by the City. Shop drawings will be
In our Statement of Qualifications Section C. Firm
and Team Experience, detailed project examples
illustrate our firm’s ability to successfully provide
reviewed for general conformance with the plans and services that may be needed under this City of Santa specifications. Each submittal or shop drawing will be Ana contract. reviewed and returned to the City, stamped with our
shop drawing stamp and marked accordingly.
29 TETRA TECH
City Council 20 – 108 5/16/2023
On-Call
Engineering
Services
3. Fee Proposal
City Council 20 – 109 5/16/2023
3. FEE PROPOSAL
As requested in the RFP, our fee proposal is provided separately. We confirm that our proposed billing rates will remain in effect throughout the first fiscal year of the contract, from June 19, 2023 through June 30, 2024. Rates are subject to change annually. 30 TETRA TECH
City Council 20 – 110 5/16/2023
On-Call
Engineering
Services
4. Certifications
City Council 20 – 111 5/16/2023
4. CERTIFICATIONS
Included in this section are the required Form 3-1 Non-Collusion Affidavit, Form 3-2 Non-Lobbying Certifications, and Form 3-3 Non-Discrimination Certification 31 TETRA TECH
City Council 20 – 112 5/16/2023
City Council 20 – 113 5/16/2023
Tetra Tech, Inc.
Tom Epperson, PE
Vice President
March 14, 2023
City Council 20 – 114 5/16/2023
City Council 20 – 115 5/16/2023
Vice President
Tetra Tech, Inc.
March 14, 2023
City Council 20 – 116 5/16/2023
On-Call
Engineering
Services
City Council 20 – 117 5/16/2023
EXHIBIT C
COMPENSATION
Consultant’s Fee Proposal including hourly rates if applicable City Council 20 – 118 5/16/2023
F E E P R O P O S A L
On-Call
Engineering
Services
RFP NO. 23-030
City Council 20 – 119 5/16/2023 MARCH 2023
FEE PROPOSAL
As requested in the RFP, our fee proposal is provided separately. We confirm that our proposed billing rates will remain in effect throughout the first fiscal year of the contract, from June 19, 2023 through June 30, 2024. Rates are subject to change annually, but shall not exceed 3%. 2023
HOURLY CHARGE RATE AND EXPENSE REIMBURSEMENT SCHEDULE
Project Management
Project Manager 1
Project Manager 2
Sr Project Manager
Program Manager
Principal in Charge
Aerial Survey
Principal Photogrammetrist
Staff Photogrammetrist
$210.00
$260.00
$300.00
$350.00
$350.00
$165.00
$115.00
Health & Safety
H&S Administrator
Sr H&S Administrator
H&S Manager
$95.00
$115.00
Engineers $145.00
Engineering Technician
Engineer 1
$80.00
$110.00
$125.00
$140.00
Construction
Engineer 2 Construction Project Rep 1
Construction Project Rep 2
$78.00
Engineer 3 $85.00
Project Engineer 1
Project Engineer 2
Sr Engineer 1
Sr Engineer 2
Sr Engineer 3
$160.00
$180.00
$190.00
$200.00
$220.00
$300.00
Sr Constr Project Rep 1
Sr Constr Project Rep 2
Construction Manager 1
Construction Manager 2
Construction Director
$100.00
$115.00
$165.00
$185.00
$233.00
Principal Engineer
General & Administrative
Planners Project Assistant 1
Project Assistant 2
Project Administrator
Sr Project Administrator
Sr. Graphic Artist
Technical Writer 1
Technical Writer 2
Sr Technical Writer
$70.00
$75.00
$95.00
$130.00
$150.00
$97.00
$124.00
$155.00
Planner 1
Planner 2
Sr Planner 1
Sr Planner 2
Sr Planner 3
$105.00
$115.00
$125.00
$150.00
$175.00
Designers & Technicians
CAD Technician 1
CAD Technician 2
CAD Technician 3
CAD Designer
$65.00
$75.00
$90.00
$100.00
$135.00
$145.00
$150.00
$50.00
Information Technology
Systems Analyst / Programmer 1
Systems Analyst / Programmer 2
Sr Sys Analyst / Programmer 1
Sr Systems Analyst / Programmer 2
$77.00
$115.00
$130.00
$196.00
Sr CAD Designer 1
Sr CAD Designer 2
CAD Director
Survey Tech 1 Project Accounting
Project Analyst 1
Project Analyst 2
Sr Project Analyst
$90.00
$114.00
$155.00
Office Survey
Survey Technician 1
Survey Technician 2
Survey Crew Chief
Project Surveyor 1
Project Surveyor 2
Senior Land Surveyor
$105.00
$120.00
$130.00
$150.00
$165.00
$210.00
Reimbursable In-House Costs:
Photo Copies (B&W 8.5”x11”)
Photo Copies (B&W 11”x17”)
Color Copies (up to 8.5"x11")
Color Copies (to 11"x17")
Compact Discs
$ 0.15/Each
$ 0.40/Each
$ 2.00/Each
$ 3.00/Each
Field Survey $10/each
One-Man Crew (Non-Prevailing)
Two-Man Crew (Non-Prevailing)
Three-Man Crew (Non-Prevailing)
One-Man Crew (Prevailing)
Two-Man Crew (Prevailing)
Three-Man Crew (Prevailing)
$175.00
$255.00
$335.00
$205.00
$340.00
$465.00
Large format copies $0.40 S.F.
Mileage-Company Vehicle
Mileage-POV
*current GSA POV mileage rate subject to change
$0.80/mile
$0.55/mile*
All other direct costs, such as production, special photography, postage, delivery services, overnight mail, and printing will be billed at cost plus 15%. All services performed by subconsultant will be billed at cost (no markup). 1 TETRA TECH
City Council 20 – 120 5/16/2023
CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND
HUITT-ZOLLARS, INC. FOR ON-CALL ENGINEERING SERVICES
THIS AGREEMENT is made and entered into on this 16th day of May, 2023 by and between Huitt-Zollars, Inc. (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A. On February 21, 2023 the City issued a Request for Proposal No. 23-030, by which it desired to retain a Consultant having special skill and knowledge in the field of:
Professional Engineering Services on an on-call basis for the City’s Public Works Agency.
B. Consultant submitted a responsive proposal that was among those selected by the city.
Consultant represents that it is able and willing to provide such services described in the scope of work that was included in the RFP No. 23-030.
C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform the services that were described in the scope of work included in the RFP No. 23-030, during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in “Scope of Services - Exhibit A”, attached hereto and incorporated by reference, and as further described in Consultant’s Proposal, attached hereto an incorporated herein by this reference as “Consultant’s Proposal - Exhibit B”.
2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for actual services performed under this Agreement at the rates and charges identified in Consultant’s Fee Proposal, which is attached hereto and fully incorporated herein by this reference as “Compensation - Exhibit C”. Consultant is one of fifteen (15) separate consultants selected to provide services on an on-call basis under RFP 23-030. The total compensation for services provided by all consultants selected under RFP 23-030 shall not exceed the shared aggregate amount of $5,000,000.00 during the term of this Agreement, including any extension periods, as set forth in Section 3, below.
EXHIBIT 3
City Council 20 – 121 5/16/2023
b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. c. Notwithstanding any contrary terms contained within Consultant’s Fee Proposal, Consultant’s fees shall not exceed 3% annually over the term of this Agreement, including any extension periods, unless directly affected by Prevailing Wage laws.
3. TERM
This Agreement shall commence on May 16, 2023 and end on May 15, 2026, with the option for the City to grant up to a one, two-year extension, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below.
4. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
5. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
City Council 20 – 122 5/16/2023
6. INSURANCE
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors.
a. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has secured all insurance required under this Section. b. Insurance coverage shall be at least as broad as:
(i) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
(ii) Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non-owned), with limit no less than $1,000,000 per accident for bodily injury and property damage.
(iii) Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
(iv) Professional Liability (Errors and Omissions) Insurance appropriates to the Consultant’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (v) If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. d. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
City Council 20 – 123 5/16/2023
(i) Additional Insured Status. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations.
General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
(ii) Primary Coverage. For any claims related to this contract, the Consultant’s insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or selfinsurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it.
(iii)Notice of Cancellation. Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. (iv)Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
(v) Self-Insured Retentions. Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.
(vi)Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City. (vii) Claims Made Policies. If any of the required policies provide coverage on a claims-made basis:
• The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
City Council 20 – 124 5/16/2023
• Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
• If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
(viii) Verification of Coverage. Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. (ix)Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.
(x) Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
7. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by City Council 20 – 125 5/16/2023
reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
8. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.
9. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.
10. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.
11. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct City Council 20 – 126 5/16/2023
or indirect, which would conflict in any manner with performance of services specified under this Agreement.
12. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
13. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
14. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultant and/or contractors retained by City.
15. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
City Council 20 – 127 5/16/2023
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
16. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
17. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
18. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
19. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
Jennifer L. Hall
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
City Council 20 – 128 5/16/2023
With courtesy copies to:
Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-xx)
P.O. Box 1988
Santa Ana, California 92702
Fax:
To Consultant:
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
[signatures on following page]
Miguel Hernandez
Project Manager
Huitt-Zollars, Inc.
2603 Main Street, Suite 400
Irvine, CA 92614
City Council 20 – 129 5/16/2023
City Council 20 – 130 5/16/2023
EXHIBIT A
SCOPE OF SERVICES
City Council 20 – 131 5/16/2023
City Council 20 – 132 5/16/2023
City Council 20 – 133 5/16/2023
City Council 20 – 134 5/16/2023
City Council 20 – 135 5/16/2023
City Council 20 – 136 5/16/2023
City Council 20 – 137 5/16/2023
City Council 20 – 138 5/16/2023
EXHIBIT B
CONSULTANT’S PROPOSAL
City Council 20 – 139 5/16/2023
ON-CALL ENGINEERING
SERVICES
PREPARED BY:
2603 Main Street, Suite 400
Irvine, CA 92614
(949) 988-5815
RFP NO. 23-030
March 14, 2023
CITY OF
SANTA ANA
ORIGINAL
City Council 20 – 140 5/16/2023
City Council 20 – 141 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030 TOC
A. COVER LETTER
B. CONTRACT AGREEMENT
1 2
C. FIRM & TEAM EXPERIENCE
Huitt-Zollars Profile
Subconsultants
Organizational Chart
Key Personnel Resumes
2 D. UNDERSTANDING OF NEED 5
F. REFERENCES
DESIGN SCHEDULE
9 10
ATTACHMENTS
Attachment 3-1: Non-Collusion Affidavit
Attachment 3-2: Non-Lobbying Certification
Attachment 3-3: Non-Discrimination Certification
15 E. WILLINGNESS TO COMPLY WITH AGREEMENT TERMS
TOCTABLE OF CONTENTS
15 Separate Sealed Envelope
1. STATEMENT OF QUALIFICATIONS
2. SCOPE OF SERVICES & SCHEDULE
3. FEE PROPOSAL
SCOPE OF SERVICES 12
4. CERTIFICATIONS
City Council 20 – 142 5/16/2023
1 City of Santa Ana Civil Engineering Services: RFP 23-030
A COVER LETTER
March 14, 2023
Mr. Sean Thomas, Project Manager
City of Santa Ana, Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
RE: Request for Proposals (RFP) No. 23-030
City of Santa Ana On-Call Engineering Services
Mr. Thomas,
Huitt-Zollars, Inc. (HZ) has been serving in Orange County for more than 30 years and looks forward to continuing this relationship by supporting the City of Santa Ana with On-Call Engineering Services. HZ is a full-service Architecture-Engineering firm with qualified staff capable of completing the assignments described in the RFP.
Our recent project completions and ongoing projects highlighted in this proposal demonstrate our team’s direct experience and well planned cost-effective approach with Public Works assignments. Our team has served Orange, Anaheim, Fullerton, Huntington Beach, Laguna Hills, Laguna Niguel, Mission Viejo, Santa Ana, San Clemente, San Juan Capistrano, Yorba Linda, Long Beach, Chino, Fontana, Ontario, Calabasas, and Thousand Oaks.
Our Project Manager Miguel A. Hernandez, PE, PLS, QSD brings a proven record in multi-disciplinary engineering assignments with Public Works entities. He served as Resident Engineer in the Mojave Solar Project that built two power plants. The power plants required sewer and water improvements including rehabilitation of several existing water wells. He also worked on the award-winning La Pata Avenue Gap Closure for Orange County Public Works. Miguel understands the importance of proactive communication and quality control in the timely delivery of a project. He will be assisted by other in-house professionals showcased in the team experience section of this proposal.
Our team is dedicated to providing high-quality products to the City of Santa Ana. This proposal is signed by an officer with authority to bind the company. Should you have any questions, please feel free to contact Miguel Hernandez at [email protected] or at (949) 988-5815 Extension 11169.
Sincerely,
HUITT-ZOLLARS, INC.
Miguel Hernandez, PE, PLS, QSD
Project Manager
CA PE No. 61378
1. STATEMENT OF QUALIFICATIONS
City Council 20 – 143 5/16/2023
2 City of Santa Ana Civil Engineering Services: RFP 23-030
B CONTRACT AGREEMENT
Huitt-Zollars has read and can execute the standard professional services contract included with the REQUEST FOR PROPOSALS (RFP) FOR ON-CALL ENGINEERING SERVICES RFP NO.: 23-030 issued on February 21, 2023. Upon request Huitt-Zollars will provided documents to comply with:
• EVIDENCE OF FINANCIAL CAPACITY • LICENSES & PERMITS • INSURANCE All City of Santa Ana projects will be implemented in compliance with the City’s policies and regulations. Huitt-Zollars is encouraged by the City’s affirmative action program and will identify teaming opportunities with Minority Business Enterprises (MBE) that are approvable by the City.
C FIRM & TEAM EXPERIENCE
For more than 45 years, Huitt-Zollars, Inc. has provided professional services to support all types of right of
way, design, hydrographic, and construction projects
including work successfully completed for agencies such as City of Santa Ana, Orange County Transportation Authority, City of Santa Fe Springs, and the City of Downey.
Huitt-Zollars, Inc. is a full-service engineering and
architectural firm with 22 regional offices. Established in 1975, the firm has a staff of more than 500 professional, technical, and support personnel with diversified skills, capable of handling highly complex multidiscipline and
concurrent assignments. The firm is ranked as a top
design firm by Engineering News-Record and Architectural Record.
Our full-service approach gives us a strong advantage in coordinating work on complex assignments. Our hands
on management by the principals of the firm results in
a client-directed sense of urgency and commitment to
quality, schedule, and budget. It also affords coordination beyond the prime/consultant organization because in
house lines of communication are firmly established and easy to maintain. This arrangement also provides a single focus for the project, resulting in smoother progression; efficient designs that balance function, economics and
aesthetics; and construction documents that incorporate our client’s objectives. Huitt-Zollars can take a project from start to finish, from initial study through design process, to construction management. With the Huitt-Zollars’
engineering department’s base of operations located in
Irvine, our firm will be able to respond efficiently to meet Santa Ana's needs.
» Walnut Grove Park
» Anaheim Cove Recreation
Trail
» West San Gabriel River Trail
» Eastside Community Park
Phase 2
» La Quinta Park
» Liberty Park Improvements
» Adelana, Byerrum & Valencia
Park Renovations
PARKS & TRAILS
» City of Santa
Ana
» City of Huntington
Beach Water
Quality
» Riverside County
FCD
» City of Mission
Viejo
» City of Yorba
Linda
» City of Santa Fe
» City of Downey
» City of Long
Beach
» Santa Margarita
Water District GIS
» OC Public Works
» Los Angeles
County
Department of
Public Works
ON-CALL CONTRACTS
ORTEGA HIGHWAY (SR 74) ROAD
WIDENING
- Partnership Award by the Orange
County Business Council
LADERA RANCH STORM WATER
SYSTEM
- Project of The Year Award
SAN JOAQUIN HILLS
TRANSPORTATION CORRIDOR
- Project of the Year Award
LAGUNA BEACH STAIRWAY AND
STORM DRAIN IMPROVEMENTS
- Engineering Public Works Award
AWARD WINNING PROJECTS
» Lost Hills/US 101 Interchange
» Montalvo Canyon Drainage
Study
» El Camino Real/Paseo Peregino
Wall
» Street of the Golden Lantern
Median Reductions
» Maintenance Service Center
Solar Canopies
IMPROVEMENT PLANS
City Council 20 – 144 5/16/2023
3 City of Santa Ana Civil Engineering Services: RFP 23-030 Through teaming strategies, HZ has added many services including geotechnical engineering, and sub-surface investigations. Our proposal includes local MBE Firms we have worked with in the past.
C BELOW SUBSURFACE IMAGING
C Below Subsurface Imaging (C Below) offers professional locating and mapping services throughout Southern California. They locate horizontal and vertical locations of underground utilities including water, gas power, waste, communications, and cable/TV. Many different methods are used to locate these utilities including GPR, CCTV, utility locators, electromagnetic locators, and potholing.
Services:
» Subsurface Investigation
» Locating
» Mapping
» Utility Trenching
ECORP CONSULTING, INC
ECORP is experienced in the preparation of Preliminary Environmental Study (PES) forms for projects per Caltrans' Local Assistance Procedures (LAPM). ECORP has used the PES form to consult with Caltrans/FHWA to determine the appropriate NEPA amd CEQA document for a project. ECORP staff have prepared Categorical Exclusions/Exemptions (CE/CEs), Environmental Assessments (IS/EAs) and Mitigated Negative Declaration/Finding of No Significant Impacts (MND/FONS|s) for a series of projects with Caltrans involvement. ECORP has experience wokring on CEQA/NEPA,biological, and cultural projects for several districts, including the City of Santa Ana.
Services:
» Environmental Services
CONVERSE CONSULTANTS
Since 1946 they have provided professional services in the fields of geotechnical engineering, engineering geology, groundwater sciences, environmental sciences and soils and materials testing and inspection. Their mission is to work together with our clients to provide them with responsive and quality services, resulting in the development of long-term relationships. Their clients include public agencies and private sector clients in the transportation, water/wastewater, educational, residential, commercial and other market segments. Converse Consultants, an employee-owned corporation, has been a consistent presence on the annual ENR Top 500 Design Engineering Firms list.
Services:
» Geothecnical Services
FEHR & PEERS
Fehr & Peers is passionate about transforming transportation consulting through innovation and creativity. The firm derives inspiration by partnering with communities to understand and shape local transportation futures objectively tailored to diverse needs. Clients trust Fehr & Peers to help them overcome barriers and uncertainty by combining advanced expertise with curiosity, humility, and initiative to deliver implementable, data-driven solutions that reinforce community values. From the most straightforward to the most complex, team members actively listen to client and community needs and handle every project with diligence and focus.
Services:
» Traffic
SUBCONSULTANTS
City Council 20 – 145 5/16/2023
4 City of Santa Ana Civil Engineering Services: RFP 23-030
ORGANIZATION CHART
The principals and professionals you see in the organization chart will be the same professionals you will see throughout the life of the project. Keeping the continuity of information and decision-making funneled through our professionals, is critical to project success. The Huitt-Zollars’ design team will be further supported by the current staff of over 500 professionals, committing our depth of resources to respond to your project. Our Project Manager will act as the single point of contact.
TEAM
Jeffrey Okamoto, PE (HZ)
+/- 5% Potential Involvement
Principal-in-Charge
Marc Haslinger, PE
Quality Control
Miguel Hernandez, PE, PLS, QSD (HZ)
20% Potential Involvement
Carl Taylor, PE, LEED AP (HZ)
+/- 5% Potential Involvement
Johnny Murad, PE (HZ)
10% Potential Involvement
CIVIL
Hla Htun, PE, PhD (HZ)
5% Potential Involvement
WATER QUALITY/SUSTAINABILITY/
LID/H&H
William Wallace, PE (HZ)
10% Potential Involvement
STRUCTURAL
PROJECT MANAGER
David Mackey, PLS (HZ)
5% Potential Involvement
LAND SURVEYING AND MAPPING
Roxanna Rivera, PE, PTOE (HZ)
+/- 5% Potential Involvement
Jason Pack, TE (FP)
+/- 5% Potential Involvement
TRAFFIC
Chris Scott, RLA, ASLA, LEED AP
10% Potential Involvement
LANDSCAPE ARCHITECTURE
Freddie Olmos (EC)
+/- 5% Potential Involvement
ENVIRONMENTAL
Hashmi Quazi, PhD, PE, GE (CC)
5% Potential Involvement
GEOTECHNICAL
Chris Loera (CB)
5% Potential Involvement
POTHOLES
Scott Parma, PE, LEED AP (HZ)
5% Potential Involvement
ELECTRICAL
John Kluber, PE, LEED AP, CEM
5% Potential Involvement
MECHANICAL
Huitt-Zollars, Inc (HZ)
Fehr and Peers (FP)
Ecorp (EC)
C-Below (CB)
Converse Consultants (CC)
LEGEND
City Council 20 – 146 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030
KEY PERSONNEL
Miguel Hernandez has more than 25 years of experience in Public Works and is proficient with the design of streets, highways, sewer, water, storm drain, grading, hydrology and hydraulics. His experience combined with his ability to communicate will make him a valuable asset to a project. As a Project Manager he will be helpful in coordinating all design inclinations and finding the appropriate balance. When critical deadlines need to be met his proven ability to work under pressure will be invaluable.
RELEVANT PROJECT EXPERIENCE
Mojave Solar Project - Hinkley, CA
Ensure all construction work conformed to applicable LORS, coordinated traffic detour plans, reviewed QSP activities, prepared documents to initiate revisions to approved drawings, responsible for work load reports and monitored progress of construction schedule. The project moved over 750,000 CY of soil during the grading activities that required coordination with survey crews and grading contractor.
To protect the site from large storm events and balance dirt moving activity 18,000 LF of channel were cut. The solar plant included rehabilitation of six existing water wells and drilling of four new water wells. Six existing water wells were used for construction water. After construction, two large existing wells were retrofitted and connected to four new water wells to provide water for domestic and power plant use. The two power plants included four water tanks total.
Farragut Avenue Improvements - Moreno Valley, CA
Hernandez was the Project Manager for improvements that included sidewalk, curb, gutters, driveways, drainage, access ramps, utility adjustments, short property walls, missing street lights, pavement repairs, and accommodation of upgraded water line (built in advance by BSMWC) in order to enhance safety and accessibility for commuters and pedestrians on Farragut Avenue from Sherman Avenue to Ellsworth Street.
Jeffrey Road/Portola Parkway Street Improvements - Irvine, CA Hernandez was the Project Manager for the civil design and survey of a new alignment of 1.5 miles of Jeffrey Road and 1.0 mile of Portola Parkway. Work included roadway rehabilitation, electrical conduits, cable/telephone improvements, right-of-way engineering, potholing, and grading. Work also included preparation of infrastructure plans, including storm drain design, 72-inches to 10-inches in diameter over 10,000 feet of pipe, hydrology and hydraulic calculations, sewer plans, dry utilities, specifications, and construction cost estimates. Jeffrey Road and Portola Parkway were designed for a six-lane highway with raised medians, new curb and gutter to replace open ditch channels, pedestrian undercrossing.
Cerritos Avenue Gap Closure - Anaheim, CA
Hernandez was the Project Manager for this project located on Cerritos Avenue from Euclid Street to approximately 600 feet east of Euclid Street. The project constructed a five foot wide ADA compliant sidewalk and new storm drain laterals with catch basins. The work also included the construction of block walls and fences. The new sidewalk eliminates the need for pedestrians to walk along the side of the road. Cerritos is designated as a four lane secondary arterial by the County’s Master Plan of Arterial Highways (MPAH) with average daily traffic of 9,400 vehicles per day. The project will provide a safer and better access for the school children and pedestrians in general. The services included right of way acquisition.
MIGUEL HERNANDEZ,PE, PLS, QSD
Project Manager – Huitt-Zollars
EXPERIENCE
27 Years
EDUCATION
BS, Civil Engineering
- Cal Poly San Luis
Obispo
REGISTRATION
Professional Civil
Engineer:
California #61378
Professional Land
Surveyor: California
#8735
City Council 20 – 147 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030
EXPERIENCE
38 years
EDUCATION
Bachelor of Science/
Civil Engineering,
California Polytechnic
State University, San
Luis Obispo
REGISTRATION
Professional Civil
Engineer:
California #46049
JEFFREY OKAMOTO, PE
Principal-In-Charge - Huitt-Zollars
Jeffrey Okamoto has more than 35 years of diverse civil engineering experience and is involved in all aspects of urban development from project management to construction support. His hands-on approach and understanding of grading, hydrology and hydraulics, storm drain, roadway, sewer, and water design for public works/private facilities is result of overseeing the overall civil engineering design during production and resolving problems encountered during construction. He is an expert at coordinating multidiscipline infrastructure projects involving the landowner, various homebuilders, various governmental agencies, a sub-consultants team and coordination of in-house staff and specialists.
RELEVANT PROJECT EXPERIENCE
La Colina, William Lyon Homes – Glendora, CA
Shea Homes - PA-14/16 at Baker Ranch, Shea Homes – Lake Forest, CA Adjacent to PA-2, RMV, Santa Margarita Water District – Unincorporated, CA Talega Master Planned Community – San Clemente, CA
City of Santa Fe Springs - On-Call Survey – City of Santa Fe Springs, CA Orange County Water District-Survey On-Call – Orange County, CA Orange County On-Call Surveying – Orange County, CA
EXPERIENCE
30+ Years
EDUCATION
BS, Civil Engineering
- California State
University at Long
Beach
REGISTRATION
Professional Civil
Engineer:
California #49158
M A R C H A S L I N G E R , P E
Quality Control - Huitt-Zollars
Having experience in both the public and private engineering sectors, Marc Haslinger brings a broad wealth of experience to his jobs. He has managed and designed numerous municipal, residential, and commercial projects throughout Southern California from initial planning and feasibility studies through final design, construction, and construction management. His experience has included residential, commercial, and industrial developments; potable and reclaimed water transmission mains and flood control facilities; roadway improvements; and construction management. Haslinger is well-versed in the tools of construction management, contract administration, planning, design, and processing.
Complementing Haslinger’s project management capabilities is a hands-on approach and technical knowledge of computer programs in the area of coordinate geometry, hydraulics, hydrology, structures, spreadsheets, critical path networking, management, and other tools necessary for a successful project.
RELEVANT PROJECT EXPERIENCE
Western Avenue Rehabilitation – Buena Park, CA
Irvine Center Drive, Sand Canyon to Barranca Parkway – Irvine, CA Irvine Center Drive, I-405 Freeway to Lake Forest Drive – Irvine, CA Bake Parkway, I-405 to Irvine Center Drive – Irvine, CA City of Dallas Facilities Capital Planning, Design and Construction - Dallas, TX* Willow Avenue Drain – West Covina, CA
City Council 20 – 148 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030
EXPERIENCE
47 Years
EDUCATION
BS, Civil Engineering -
University of California
at Berkeley
REGISTRATION
Professional Civil
Engineer:
California #30924
LEED AP, 2008
CARL TAYLOR, PE, LEED AP
Civil Engineer - Huitt-Zollars
Carl Taylor has a strong background in public infrastructure projects. He has worked on arterial highways and intersections, local and neighborhood streets, master plan and local storm drains, city and community parks, trails, streetscapes, vehicular and pedestrian bridges, city halls, libraries, community centers, memorials and plazas, parking lots, sewer and water facilities, and pedestrian and bicycle/ pedestrian trails. During his professional career, Taylor has provided plans, specifications, estimates, and construction administration and support for numerous city, county, redevelopment agency, federal, and community facilities district projects.
RELEVANT PROJECT EXPERIENCE
OC Parks On-Call Projects – Orange County, CA
» Mathis Trail Repair, Aliso & Wood Canyons
» Creek Restoration, Wagon Wheel Regional Park
» General Development Plan, OC Zoo
» Santiago Creekbank Repair at Arden Modjeska
» Historic Site, Modjeska Canyon Nature Preserve
» Tijeras Creek Trail Repair, O’Neill Regional Park
» Trail Crossing Replacement, Santiago Oaks Regional
Park
» Wagon Wheel Creek Restorations, Thomas F. Riley
Wilderness Park
Oso Parkway & Antonio Parkway Intersection Improvements – Orange County, CA La Pata Ave Gap Closure & Del Rio Extension – Orange County, CA Sulphur Creek (Drainage Facility J03) – Laguna Niguel, CA Design-Build of Riverside National Cemetery Phase V – Riverside, CA Horno Detention/Water Quality Basin – Orange County, CA » FEMA Repairs, Carbon Canyon
Regional Park
» FEMA Repairs, Limestone / Whiting
Ranch Wilderness Park
» FEMA Repairs, Upper Newport Bay
Nature Preserve
» FEMA Repairs, Laguna Coast
Wilderness Park
» Bakersfield National Cemetery
EXPERIENCE
26 Years
EDUCATION
BS, Civil Engineering
- California State
Polytechnic University,
Pomona
REGISTRATION
Professional Civil
Engineer:
California #67512
JOHNNY MURAD, PE, MS, QSD
Utility Design - Huitt-Zollars
Johnny Murad brings 26 years of experience in civil engineering consulting. He has assisted numerous clients in site selections, feasibility studies, preliminary construction cost estimates, earthwork estimates, plan check and permit fee estimates, conceptual site planning, final design, and construction administration.
His experience gives him a good understanding of project costing techniques and calculations, which can help keep the project cost at a minimum without losing efficiency and, thereby, help his clients stay within their planned project budget and maintain their strength in the market.
RELEVANT PROJECT EXPERIENCE
Alder Avenue, Casa Grande Drive, Summit Avenue, and Mango Avenue Sewer Improvements – Rialto, CA
Redlands Boulevard Sewer Improvements – Moreno Valley, CA Brodiaea Avenue, Cactus Avenue, Joy Street, Gilbert Street, Rebecca Street, Frederick Street, and Heacock Street Sewer Improvements – Moreno Valley, CA San Bernardino Avenue Sewer Improvements – San Bernardino, CA City of Rialto, Tract No. 16304 Sewer Improvements – Rialto, CA City Council 20 – 149 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030
EXPERIENCE
44 Years
EDUCATION
MS, Civil Engineering
- University of Texas at
Arlington
BS, Civil Engineering -
University of Texas at
Arlington
REGISTRATION
Professional Structural
Engineer:
Texas: 59641
WILLIAM WALLACE, PE
Structural Engineer - Huitt-Zollars
William Wallace has more than 44 years of experience as a Structural Engineer. He has been involved in the design of many highly complex structures for flood control and soil and water conservation construction programs for the Corps of Engineers (COE) and the Natural Resources Conservation Service (NRCS).
Projects have included reinforced concrete hydraulic structures such as trapezoidal channel paving, rectangular channels, impact basins, drop structures, retaining walls, and reinforced concrete for principal and auxiliary spillways of lakes and dams. Wallace provided the structural design or provided peer reviews of projects where the objectives of the project was to design modifications to dams and their appurtenant structures to mitigate risks related to dam safety concerns; and to meet current regulations and standards as provided by Conservation Districts, NRCS, COE, and various Departments of Water Resources.
RELEVANT PROJECT EXPERIENCE
Oxnard Village Flood Control Facilities – Oxnard, CA
Cottonwood Creek Trail and Bank Stabilization – Allen, TX Rush Creek Channel Erosion Control – Arlington, TX
Channel Improvement Project – Fort Worth, TX
Brazos River Study – TX
Lake Ray Roberts Outletworks Conduit and Power Penstock – Lake Ray Roberts, TX
EXPERIENCE
24 Years
EDUCATION
BS, Civil Engineering,
Surveying
Engineering Option -
California State
Polytechnic University
Pomona
REGISTRATION
Professional Land
Surveyor: California
#8912
David Mackey has 21 years of experience in the preparation of Tract Maps, Parcel Maps, Records of Survey, Right-of-Way maps, Legal Descriptions, ALTA Surveys and Lot Line Adjustments. He has been involved in numerous rehabilitation projects for parks, streets and intersections using conventional survey, GPS survey and scanning. David coordinates field crews, processing field work and delivers final CAD product and has extensive survey experience in Southern California.
RELEVANT PROJECT EXPERIENCE
Topographic Surveys, City of Costa Mesa – Costa Mesa, CA University of California, Irvine – Irvine, CA
Topographic Survey, Bristol Street – Santa Ana, CA
Topographic Surveys, City of Santa Fe Springs – Santa Fe Springs, CA Wishing Tree Park – Torrance, CA
Pacific Electric Bike Trail – Upland, CA
DAVID MACKEY, PLS
Land Survey - Huitt-Zollars
City Council 20 – 150 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030
EXPERIENCE
10 Years
EDUCATION
PhD Natural
Resources &
Environmental
Management,
University of Hawaii at
Manoa
MS, Civil Engineering,
California
State Univeristy, Long
Beach
REGISTRATION
Professional Civil
Engineer:
California #80108
HLA HTUN, PE, PHD
Hydrology & Hydraulics Engineer - Huitt-Zollars
Dr. Htun is a Professional Engineer with more than 10 years of experience specializing in surface water modeling, hydraulic design, and water resource management. Currently, he conducts hydrological and hydraulic studies for urban development. He designs and analyzes energy dissipators for a major arterial highway improvement against downstream erosion. He designs Low Impact Developments for flood control and hydrologic condition of concern while preparing the Water Quality Monitoring Report, Drainage Report, and Stormwater Pollution Prevention Plan
RELEVANT PROJECT EXPERIENCE
East Los Angeles College East and Corporate Stormwater – Monterey Park, CA Cypress Ave & Foothill Blvd Storm Drain and Street Improvements – Fontana, CA Pine Avenue Extension – City of Chino, CA
“F” Street PS&E – Rancho Mission Viejo, CA
EXPERIENCE
31 Years
EDUCATION
MBA, University of
Michigan, Ann
Arbor
BS, Mechanical
Engineering,
Georgia Institute of
Technology
REGISTRATION
Professional Structural
Engineering: Texas
#122644
LEED AP
John Kluber is Vice President for Huitt-Zollars. Kluber has over 30 years of industry experience in numerous educational, industrial, healthcare, and government projects. He has been involved in all phases of design from programming through preparation of construction documents. He has been EOR and project manager for numerous renovation projects for healthcare, mission-critical facilities, and institutions that are fully occupied and operate 24/7/365. He understands the complexities of maintaining and operating building systems for fully occupied buildings while making modifications and incorporates them into his design approach.
RELEVANT PROJECT EXPERIENCE
Water Tank Replacement at LA Co. Fire Camp No. 9 – Los Angeles, CA Public Safety Building Facility Assessment – Lancaster, CA UT Southwestern Medical Center Zale Lipshy Pavilion Chilled Water Study – Dallas, TX UT Southwestern Medical Center NE Building – Fort Worth, TX UT Southwestern Medical Center NE2.416B Replacement PET CT – Dallas, TX UNT Discovery Park MEP Upgrades – Denton, TX
Children’s Health Sleep Center – Dallas, TX
CapMetro Bus Elect. Ph. 2 - North Ops – Austin, TX
City of Denison Facility Condition Assessment – Denison, TX LVWD - Feasibility Study for New Field – Clint, TX
Admin Bldg Air Handling Unit Replacement – Fort Worth, TX
JOHN KLUBER, PE, LEED AP, CEM
Mechanical Engineer - Huitt-Zollars
City Council 20 – 151 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030 Roxanna Medina has more than 25 years of experience in design and project management for municipal public works, infrastructure, environmental, hydrology, and hydraulics projects. She has managed several design and construction projects that were funded with federally funded. She has also worked extensively with reporting requirements with FHWA so that municipalities are reimbursed under the terms of the Local Project Advanced Funding Agreements (LPAFA).
RELEVANT PROJECT EXPERIENCE
Oxnard Blvd / Wagon Wheel Road Traffic Signal – Oxnard, CA Oxnard Blvd / Orchard Place Traffic Signal – Oxnard, CA Oxnard Blvd / Vineyard Ave Traffic Signal – Oxnard, CA
Vineyard Avenue at Town Center Drive Traffic Signal – Oxnard, CA Lantana Traffic Circulation Study, Lantana Community – Denton County, TX
ROXANNA MEDINA,PE,PTOE,LEED AP
Traffic Engineer - Huitt-Zollars
Jason D. Pack, P.E., is a Principal with Fehr & Peers located in Southern California. He is actively involved in a wide variety of project work but also finds time to lead the firm’s research and development efforts in Emergency Evacuation assessment. Jason has an extensive background in travel demand forecasting, traffic operations assessment (including micro-simulation assessment), VMT analysis, big data analysis, transit ridership forecasting, and transportation impact studies involving NEPA and CEQA. His focus is to utilize his experience and the technical resources of the company to help clients answer their toughest questions related to mobility. His recent work has included forecasting and operations assessment for large infrastructure improvements, developing recommendations for SB 743 implementation (California's new requirements to consider VMT as an impact metric under CEQA), assisting agencies with establishing VMT banks/exchanges, emergency evacuation assessment to respond to new legislative requirements (SB 99 and AB 747) and development of innovative transportation policies to assist City's advancing transportation into the future.
RELEVANT PROJECT EXPERIENCE
The Academy Charter High School Transportation Impact Analysis – Santa Ana, CA Bat Nha Meditation Center Transportation Impact Analysis – Santa Ana, CA Parking Assessment - numerous parking assessments
CEQA/NEPA Assessment – Jason has completed transportation assessments for over 150 projects in support of CEQA or NEPA documentation.
General Plans – Jason has worked on a wide variety of General Plans throughout the state of California Specific Plans/Master Plans/Corridor Plans – Jason has completed assessment for more than 20 specific plans, master plans, and corridor plans.
Interchange and Corridor Studies - Jason has completed the Traffic Report for numerous transportation infrastructure studies throughout California
JASON PACK, TE
Traffic Engineer - Huitt-Zollars
EXPERIENCE
25 Years
EDUCATION
MS, Environmental
Engineering -
University of Texas at
El Paso
BS, Chemical
Engineering - Texas
A&M Univesity
REGISTRATION
Professional Civil
Engineer: Texas
#100696
EXPERIENCE
23 Years
EDUCATION
Bachelor of Science
in Civil Engineering,
University of
California, Davis
REGISTRATION
Licensed Traffic
Engineer: California
(TR2402)
City Council 20 – 152 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030 Chris Scott is the Team Leader for Planning and Landscape Architecture for the Huitt-Zollars Dallas office.
His past project experience ranges from master planning and visioning of urban land developments, community amenity design and aesthetics, hike and bike trail development, multi-family, town home, and student housing developments, commercial and retail developments, multi-use urban developments, streetscapes, manufacturing and industrial development, private and public park development, corporate campus design, restaurant and hotel development, tree preservation and identification, and federal and military housing and urban development.
RELEVANT PROJECT EXPERIENCE
Prima Desecha Landfill Viewshed Study- OC Waste & Recycling – Orange County, CA Coyote Canyon Viewshed Planting PS&E - OC Waste & Recycling – Orance County, CA Irvine Regional Park & Drainage Runoff Control – Orange County, CA Electric Bus Charging & Storage Lot - UCI – Irvine, CA
The Landing at Riverpark – Oxnard, CA
CHRIS SCOTT, RLA, ASLA, LEED AP
Landscape Architect - Huitt-Zollars
JESUS "FREDDIE" OLMOS
Environmental - ECORP
Freddie Olmos has more than 23 years of experience in Environmental Engineering and is proficient with environmental undertaking of the design of streets, basins, sewer, water, storm drain, grading, and public works projects.
RELEVANT PROJECT EXPERIENCE
West Street and Citron Street Sidewalk Gap Closure Project – Anaheim, CA Lincoln Avenue Widening Project – Anaheim, CA
La Palma Avenue at East Street Sidewalk Gap Closure Project – Anaheim, CA State College Boulevard and La Palma Avenue Intersection Improvement Project – Anaheim, CA
EXPERIENCE
32 Years
EDUCATION
BLA - Texas Tech
University
REGISTRATION
Registered Landscape
Architect: Texas #1976
California #5316
CNU Accredited: 2013
EXPERIENCE
23 Years
EDUCATION
BA, Environmental
Analysis & Design -
University of California
at Irvine
City Council 20 – 153 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030 Dr. Quazi has 35 years of experience providing geotechnical engineering services and has earned a reputation for providing quality work in an honest and ethical manner, on time and within budget. Dr.
Quazi provides quality control, budget oversight, and technical assistance on various types of projects, including storm drains, pipelines, and wastewater treatment plants. He has supervised site investigations and prepared technical reports for facilities located in areas of high liquefaction potential and difficult subsurface conditions.
RELEVANT PROJECT EXPERIENCE
County Line Channel Storm Drain Connection Project - Ontario, CA Chino Storm Drain Installation - Chino, CA
Ramona Ave. Storm Drain & Pavement Rehabilitation - Rancho Cucamonga, CA Sultana-Cypress Storm Drain - Ontario, CA
Three System Storm Drain - Chino, CA
EXPERIENCE
35 Years
EDUCATION
Ph.D, Civil
Engineering, University
of Arizona
REGISTRATION
Professional Civil
Engineer
California #46651
Professional
Geotechnical Engineer
California #2517
HASHMI QUAZI, PHD, PE, GE
Geotechnical Engineer - Converse Consultants
Chris Loera has over 16 years of experience in the construction industry. He maintains a hands-on approach by researching and attending industry workshops. He meets with the equipment manufactures to stay up to speed on the new technologies available. He plans, organizes, directs and controls the activities of the Operations function of the division. Responsible for the performance of all Departments including Research and Development, Material Management, Order Services, Engineering and Surveying.
RELEVANT PROJECT EXPERIENCE
SR-55 Widening Project – Irvine, CA
Port of Long Beach On-Call – Port of Long Beach, CA
LAX Delta T2/T3 Utility Investigation and Mapping – Los Angeles, CA
EXPERIENCE
16 Years
REGISTRATION
Ground Penetrating
Radar Technician
Level III
Technician Locator
Level III
CHRIS LOERA
Subsurface Imaging - C Below
City Council 20 – 154 5/16/2023
City of Santa Ana Civil Engineering Services: RFP 23-030
EXPERIENCE
42 Years
EDUCATION
BS, Electrical
Engineering - Texas
A&M University
REGISTRATION
Professional Electrical
Engineer:
Texas #75690
SCOTT PARMA, PE, LEED AP
Electrical Engineer - Huitt-Zollars
Scott Parma’s engineering experience includes power distribution, electrical systems analysis, system planning, electrical system design, and construction administration. He has completed a wide array of facilities projects in the utility, transportation, municipal, infrastructure, and commercial sectors of construction. His main expertise is in medium-and low-voltage power systems design and analysis. He also has experience in lighting, telecommunications, and fire alarm system design.
RELEVANT PROJECT EXPERIENCE
Bakersfield National Cemetery - Phase 1 – Arvin, CA
Riverside National Cemetery - Phase 5 – Riverside, CA
Coyote Canyon Repower Electrical PS&E – Fontana, CA
LA Metro Division 13 Bus Maintenance and Operations Facility – Los Angeles, CA UCI Lot 36 Electric Bus Yard – Irvine, CA
Maintenance Service Center Solar Canopies – Thousand Oaks, CA City Council 20 – 155 5/16/2023
5 City of Santa Ana Civil Engineering Services: RFP 23-030
DUNDERSTANDING OF NEED
The City intends to retain civil engineering consultants from a pre-qualified list to provide services for a variety of projects on an asneeded basis. Projects may include:
TASK HUITT-ZOLLARS CONSULTANT
Civil Engineering X
Construction Documents (PS&E) X
Construction Administration X
Hydraulics Modeling (Storm, Water, & Sewer) X
Street Improvements and Rehabilitation X
Utility Design X
Right-of-Way Studies X
Sustainable Infrastructure Services X
Water Well Design X
Dry Well Design X
Storm Water Treatment X
Sewage Lift Station X
Pressure Control Systems X
Financial and Economic Consulting Engineering X X
Grant Writing Services X X
Pavement Management X
Fire Protection X
Special Engineering Studies X X
Regulatory Compliance X
Transportation/Traffic X
Signal Modifications X X
Traffic Studies X X
Signing and Striping X
Bike Path Design X
Structural Engineering X
Land Surveying X
Mapping X
Construction Staking X
Landscape Architecture X
Construction Management X
Mechanical Engineering X
Electrical Engineering X
Geotechnical Engineering X
Environmental/Planning Support X
Instrumentation and Control Systems X
City Council 20 – 156 5/16/2023
6 City of Santa Ana Civil Engineering Services: RFP 23-030 Our QA/QC program sets a procedure that ensures all deliverables. As an ISO 9001:2015 compliant firm, the Quality Management Program serves as the foundation for continuous improvement in all aspects of our work. For our staff Quality Assurance is more than just a program that ensures proper internal review and documentation. It is a frame of mind with which we approach our work. The procedure will help us deliver high quality plans at 30%, 60%, and final submittal.
Our quality assurance program comprises all activities necessary to ensure that projects perform according to expectations.
The QA program places emphasis on planning control, design control, computer software control and records. We institute our QA program through early involvement of experienced members. This process begins with our proposal, is formalized by project kick off, and continues through project close out via our coordination. The program will ensure that an acceptable level of quality is achieved and maintained in each design.
We are proposing a highly-specialized team of registered professionals with a history of delivering on similar projects. A team with a bench strength unmatched in the industry. Our project manager will be assisted by the principal-in-charge and supported by key personnel. The staff we are committing is organized so that redundant leadership is available in critical aspects of design. Our team offers additional value because it will rigorously analyze a design to provide sustainable cost effective solutions.
ADVANCEDESIGN – To effectively incorporate advance innovative designs into projects, it is imperative to select a team that has been properly prepared. Our team approach will explore design from all sides, meet challenges from new angles, and help uncover perspectives that are often overlooked. Our design process is interactive and responsive. It engages all stakeholders relevant to the success of the project. We have assembled the right team!
At the proposal stage overall project direction is determined, the strategy for project is specified, and general methodology is developed.
Milestones are set with measurable timelines for checking progress on budget and scope completion. After award, our project manager prepares a project specific Work Plan. The Project Work Plan adds detail to the proposal scope of work, identifies the project team assignments and responsibilities, the project budget and schedule, and information regarding design criteria, inputs and constraints for the project. The Plan also specifies the governing design codes, guidelines and CAD standards.
Work Breakdown Structure - Huitt-Zollars will develop a Work Breakdown Structure (WBS) that identifies specific tasks needed to accomplish the proposed scope of services. We will determine the level of effort required for each discipline to complete each task under the WBS. This effort is used to establish the proposed compensation for the project and helps overcome potential budget challenges.
Detailed Project Schedule – Several characteristics comprise our approach to developing and maintaining a realistic schedule. This starts with participation of the entire project team. It is imperative that the schedule be sensitive to the demands of every discipline and client review periods. A schedule must account for stakeholder considerations and include time contingencies for resolving unforeseen variables. Our PM is assigned the responsibility of developing and tracking the project schedule. Our WBS format allows our PM to review budgets against associated milestones. We require that the PM update the Principal with project progress weekly. This results in a sense of urgency that will benefit each project.
Quality project delivery can be impacted by many things. However, there are five areas that will demand our focus.
We will design both projects A and B as the City intended to design them. This will be accomplished by listening and clearly understanding your expectations. We will confirm our understanding in our negotiated scope and verify that we are on track by conducting design review meetings on a regular basis from planning through final design. » We will design projects as the City intends to design them. This will be accomplished by listening and clearly understanding your The Project Work Plan includes a Project Quality Management Plan (QMP) that is specific for each project. The QMP
identifies the QC Manager and constructability reviewer. It includes project deliverables, design tasks, and schedules in-house reviews. The QMP verifies that the all requirements are met. It is based on a 4-step process of Plan – Do – Check – Act. By working on continuous improvement we ensure
that our services provide added value.
City Council 20 – 157 5/16/2023
7 City of Santa Ana Civil Engineering Services: RFP 23-030 expectations. We will confirm our understanding in our negotiated scope and verify that we are on track by conducting design review meetings on a regular basis from planning through final design. » We will meet with sub-consultants to ensure their scope is complete. » We will design the project in accordance with your schedule. This begins with development of a detailed schedule that includes critical path, agency review times, and milestones. Progress will be reviewed during our design meetings. » We will design a project that is within your budget. We will develop a project budget that includes contingency, probable construction cost, and consultant fees. The probable construction cost will be prepared using current unit prices and submitted for review. » We strive to minimize non-client initiated change orders during construction. Our QA/QC procedure implements a constructability reviewer. It helps us foresee and resolve potential issues before the bidding phase.
Our PM will establish the framework and ensure that we capture your expectations for quality prior to publishing our plan.
Existing Utility Inventory - Every project presents its own special design challenges. The most frequent challenge related to existing utilities we would expect in the City of Santa Ana. Is that improvement to utilities located in developed areas will generally affect or be affected by other utilities. Through experience we have learned that existing records may be non-existent, inaccurate, or lack information. This is why all projects require an effective existing utility locating approach. A precise utility inventory will:
» Equal a high quality design
» Avoid conflicts during construction
» Prevent utility interruptions
With HZ, utilities will be located, verified, and compiled into a V8i CADD file using a “Four Tier Approach." Environmental Assessment – Verify that the work limits are within areas with existing infrastructure. Small improvements of this nature typically qualify for environmental exclusions but if the work requires a negative declaration. Our first step would be to research existing environmental filing(s). There after our consultant and civil team would assist the City of Santa Ana with supporting studies and documentation to comply with CEQA and/or NEPA.
Topography - HZ is leading the industry with fixed wing aerial drone surveying. The new technology has a perfect platform in topography.
With on board RTK the data will generate an accuracy that matches conventional aerial photography but a picture quality that is unmatched.
It allows for quicker delivery and data control at a competitive fee. The data would be supplemented with a field survey(s) and tied to the most appropriate datum. HZ will acquire necessary permits to perform aerial surveys via drones. Our survey department would also provide legal descriptions, if required. Providing plans, specifications, and estimates (PS&E) for engineering projects is the backbone of our Irvine branch. We are familiar with local, state, and federal codes and regulations. This ensures that the design is in conformance with established guidelines. We are also experience with preparation of special provisions. We have been serving Southern California for over 30 years this includes projects with the City of Santa Ana. We are familiar with the City’s criteria for acceptance of plans. » Promote public safety
» Avoid construction change orders
» Prevent construction delays
TIER I: SITE INVESTIGATION - Huitt-Zollars conducts a cursory site investigation that includes pictures used to formulate the scope of services. The information gather identifies utility purveyors in the project vicinity and assesses probable challenges.
TIER II: GATHER RECORD DATA - Huitt-Zollars request records from utility purveyors in the project vicinity. The City of Santa Ana will provide information in its possession relevant to the preparation of the project plans. Record information will be reviewed and compiled into a V8i CADD file. The information is further verified during the topographic survey.
TIER III: TOPOGRAPHY SURVEY – One week prior to surveying, HZ will contact Dig-Alert USA with a project exhibit to request that existing utilities be marked within the project limits. Our survey department will capture utility markings, visible surface utility features, and dip manholes as necessary. The survey shots will be compiled with the record data and used to verify utility locations, inverts, size, and flow direction. The information will help our civil team foresee potential challenges during design.
TIER IV: SUB-SURFACE INVESTIGATION - The data collected in previous tiers is used to arrive at possible utility conflicts during preliminary design. Our goal is to resolve each conflict via good research and design. But we must also prepare with a set aside budget for further sub-surface investigation shall it be necessary. A task sets aside a budget for potholing cost and incidentals. The investigation is kicked off after preliminary design so that the findings help improve the level of quality of future submittals.
City Council 20 – 158 5/16/2023
8 City of Santa Ana Civil Engineering Services: RFP 23-030 Encroachment – Potential encroachments would be identified in the proposal stage. The work to coordinate, design, provide temporary easements, etc. would be included in the fee proposal. Our goal during design is to make every attempt possible to avoid impact to adjacent properties but it is not always possible. Confirm that all work will fall within City controlled property and that encroachment is not necessary.
Water Well Expertise – Our proposed project team has a history of successfully delivering water well design services. Our Bakersfield National Cemetery Project constructed a water well for domestic and irrigation use. Our proposed PM, Mr. Hernandez, rehabilitated several water wells that were used for construction water. The same water wells were later used to feed a cooling system for the Mojave Solar Project.
Utility Services – Our project experience offers many projects with sewer, water, and storm drain design. We have also provided dry utilities coordination. We are currently working on projects that install and/or retrofit utilities.
Roadway Design Specialists – Our project team has provided roadway design services for urban, rural, primary, secondary, and major roadways. We are equipped to address all aspects including:
• Conceptual Design Alternatives
• Utility relocations/adjustments
• Parkway Landscaping
• Sound Wall and Retaining Walls
• Drainage
Traffic Engineering – We offer complete traffic engineering services. HZ has completed hundreds of traffic engineering projects. Our traffic engineering staff are experts in all aspects of traffic engineering and operations. This includes:
• Signing and Striping
• Temporary Traffic Control
• School zones
• Pedestrian Safety
Traffic Control – The signing and striping would consider the proposed bike path. Both project will require temporary traffic control during construction. Temporary traffic control could be deferred to construction phase or it could be included with construction documents.
Hydrology and Hydraulics Analysis – Include a hydrology and hydraulics analysis that assess drainage improvements.
Water Quality Compliance
WQMP – In accordance with MS4 Permit Guidelines
SWPPP - Prepares PRDs in accordance with the requirements set forth in the NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities. The SWPPP may also be deferred to the construction phase.
Geotechnical Recommendations – Our consultant will provide the required analysis to determine the street section thickness, subsurface soils classification and condition, evaluate soil properties, provide geotechnical parameters, trench stability requirements, and backfill recommendations. We will coordinate with the City to make sure quality and durability are not compromised.
Estimates – HZ will generate quantity takeoffs and an opinion of probable construction cost for proposed project improvements. Cost estimates shall include construction, engineering, inspection, administration, right-of-way, and contingency. The estimate shall tie the unit price to a cost index and provide a format that is easily updated or revised. Bid prices from recent city project shall be reviewed to verify unit prices.
Specifications – HZ will utilize the City of Santa Ana standard bid specifications and edit them to fit both project requirements. This will include a bid sheet showing the anticipated project quantities.
Construction Administration Services
1. Bid Support – Assist City with bid documents, attend bid meeting, and provide bid support.
2. Construction Support – Attend pre-construction meeting, provide ongoing support, and attend construction meetings as required.
3. Project Close Out – Utilize contractor redlines for as-built plans to prepare record plans in Micro-Station V8i CADD and pdf format.
• Storm Water Management
• Rehabilitation
• Final Design PS&E packages
• Bike Path
• Bicycle Safety
• Parking, access, and circulation
• Traffic Calming Plans
City Council 20 – 159 5/16/2023
9 City of Santa Ana Civil Engineering Services: RFP 23-030 Client Satisfaction – Huitt-Zollars achieves client satisfaction by dedicating a concise and experience team that will deliver on schedule and within budget. A key component is effective communication that begins with listening to the City’s ideas, concerns, and goals. Our status reports summarize discussions, provide follow up action items, and set dates for follow up items. We will create a project work plan that includes that includes all critical tasks to deliver a design that meets expectations. We will integrate ourselves via meetings, emails, and conversations so that we become an extension of the City’s vision for the project. We will attend community meeting to help gain acceptance.
E AGREEMENT TERMS
Huitt-Zollars has no exceptions to the proposed contract.
City Council 20 – 160 5/16/2023
10 City of Santa Ana Civil Engineering Services: RFP 23-030
F REFERENCES
CITYWIDE SANITARY SEWER AND DOMESTIC IMPROVEMENTS
Santa Ana, California (ONGOING) Huitt-Zollars
RELEVANT DESIGN
COMPONENTS:
• PS&E
• Paving
• Domestic Water Improvements
• Sewer Improvements
• Environmental
As part of a five year On-Call Services with the City of Santa Ana Water Resource Department. Huitt-Zollars is providing Plans, Specifications and Estimates (PS&E) for several projects in the City of Santa Ana.
1. The Sanitary Sewer Septic to Gravity Conversion Project proposes to construct 8" sewer in a neighborhood near 17th Avenue and Tustin Avenue. Huitt-Zollars in providing CEQA documentation and PS&E for over 2500 linear feet of proposed 8" sewer, service laterals, and manholes.
2. Lacy Neighborhood Water Replacement Project proposes to replace over 15,000 linear feet of water line and services. The project is part of a citywide program that proposes to replace and increase capacity of over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E that include topography and temporary high water lines.
3. French Park Water Replacement Project proposes to replace over 15,000 linear feet of water line and services. The project is part of a citywide program that proposes to replace and increase capacity of over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E that include topography and temporary high water lines.
CLIENT CONTACT:
City of Santa Ana
Armando Fernandez
Senior Civil Engineer
Public Works I Water Resources
[email protected]
20 Civic Center Plaza, M-35
Santa Ana, CA 92802
714.647.3316
SANTA MARGARITA WATER DISTRICT
Rancho Santa Margarita, California (ONGOING) Huitt-Zollars Huitt-Zollars prepared the design of approximately 6,000 of 12” HDPE highline for recycled water to assist the Water district in the transportation of recycled water through the Santa Margarita Water District. Huiit-Zollars also assisted the Santa Margarita Water district in the design and construction of a booster pump station to boost the pressure of the recycled water line through multiple pressure zones.
Additionally, Huitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe materials and underground the highline into a casing and create a crossing of a secondary arterial highway. The design was completed to allow for the maintenance of the pipe without disrupting traffic on the highway.
RELEVANT DESIGN COMPONENTS:
• Survey
• Engineering Estimates
• Water Improvements
CLIENT CONTACT:
Santa Margarita Water District
Jamie Aguilar
[email protected]
26111 Antonio Parkway
Rancho Santa Margarita, CA 92688
949.459.6400
City Council 20 – 161 5/16/2023
11 City of Santa Ana Civil Engineering Services: RFP 23-030
OXNARD VILLAGE WAGON WHEEL
Oxnard, California (ONGOING) Huitt-Zollars
Oxnard Village is an approximately 60-acre privately funded re development project located at the westerly gateway to the City of Oxnard, along the 101 Freeway. The under-utilized site contained 1950’s era motel, mobile home park, retail/commercial and light manufacturing uses. This mixed use project will ultimately include 1,500 residential units with row-houses, podium stacked flats, live-work units and luxury high rise condominiums and luxury hotels. Four parking lots have already been designed which included aesthetic, decorative lighting, water quality, space, enhanced paving, vehicular, pedestrian and disabled access, as well as drainage challenges.
In each case, both a functional and aesthetically pleasing built environment resulted. The project is ongoing and will continue development while serving the City of Oxnard for many decades into the future.
RELEVANT DESIGN COMPONENTS:
• Street Improvements
• Sewer, Domestic Water
• Reclaimed Water
• Storm Drain
• Flood Control
• Mulitple Parking Lots
• Landscaping
• Water Quality
• Vehicular & Disabled Access
CLIENT CONTACT:
Oxnard CRFL Partners
Carl Renezeder
[email protected]
64 Maxwell
Irvine, CA 92618
949.719.9040
SB 743 IMPLEMENTATION
Santa Ana, California (2019-2020) Fehr & Peers
Fehr & Peers guided the City of Santa Ana through the process of updating and adopting the City's traffic impact study guidelines consistent with requirements of SB 743. Fehr & Peers made VMT estimates for the entire Orange County region in support of the recommended thresholds of significance, including screening maps to facilitate City processing of projects. Fehr & Peers also provided a guidance document with sample projects to assist the City with implementation. This effort included education of staff and collaborative meetings to meet City goals. The City VMT thresholds and TIA Guidelines have been adopted by the Santa Ana City Council. This project was delivered on budget and on schedule, within the July 2020 adoption deadline.
RELEVANT DESIGN COMPONENTS:
CLIENT CONTACT:
City of Santa Ana
Zdeněk “Zed” Kekula
Senior Civil Engineer
[email protected]
20 Civic Center Plaza, Santa Ana, CA 92701
714.647.5606
City Council 20 – 162 5/16/2023
12 City of Santa Ana Civil Engineering Services: RFP 23-030 2 SCOPE OF SERVICES & SCHEDULE
Huitt-Zollars reviewed the RFP and provides the following as a supplemental sample scope of services. Design plans and reports would follow the City’s standard format.
TASK A: Project Management and Coordination - After contract award HZ will prepare a Project Work Plan (PWP) and schedule a kick-off meeting. The PWP will be provided to the City for review and comment prior to the kick-off meeting date. Said PWP will expand on:
» Design Team (City of Santa Ana/HZ/Consultants)
» CADD Standards
» Scope of Work/Deliverables
» Drawing List
» Applicable Criteria/Standards/Codes
» Specification Requirements
» Schedule/Milestones
» Design Budget(s)
» Quality Control/Quality Assurance
» Value Engineering (Construction Budgets)
During the kick-off meeting the development team will review the PWP, identify key staff, and establish lines of communication. The PWP will be updated per comments provided during the kick-off meeting and publish with the City’s approval. The published PWP will be used by the project manager to monitor the project during design.
Starting from the date of kick-off meeting, Huitt-Zollars will be responsible for project management and coordination of the project. This includes:
» Development team meetings between the City of Santa Ana and consulting team » Meetings with affected community members, stakeholders, and utility companies Sample List:
City of Santa Ana (Water, Sewer, & Storm)
Orange County Sanitation District
Union Pacific Railroad
Southern California Edison
Southern California Gas
AT & T
TASK B: Records Research – The utility list will be compared to findings from Underground Service Alert. All Utility agencies will be contacted to gather and review available record data. Record information will be evaluated against the survey and compiled into a master Vi8 CADD file. HZ will evaluate “record” information against proposed facilities to pinpoint potential conflicts. All potential conflicts will be tagged for further investigation during the pothole investigation.
TASK C: Survey – The overall topography includes a design survey that captures surface information within the right-of-way and an aerial that extends the topography beyond the right-of-way to capture private property features. It is assumed that the topography limits will be sufficient for design. The City will also provide the record boundary that will be necessary to evaluate right-of-way and property encroachments.
Prior to commencing design the project manager and key personnel will walk the site to evaluate the topography and record information against the existing condition. HZ will review the topography against visible utility features, notate SCE power pole number tags, control panel types, traffic signal types, and mast arm lengths. The information will be compile into the master Micro-Station CAD file for discussion prior to the design phase.
Time Warner Cable
Santa Ana Unified School District
Preparation of progress reports to the City of Santa Ana Monitoring the design elements and schedule per published PWP Securing permits – HZ will coordinate with agencies involved in the project, prepare, and file to acquire required permits on behalf of the City of Santa Ana.
City Council 20 – 163 5/16/2023
13 City of Santa Ana Civil Engineering Services: RFP 23-030 TASK D: Geotechnical Studies/Reports/Boring – Review existing geotechnical report and prepare a comprehensive geotechnical investigation including adequate borings for proper design of proposed work. Obtain required permits to conduct geotechnical investigations and perform applicable lab test to provide information necessary for a comprehensive design. A draft copy of the geotechnical report will be provided for review and comment. Traffic control in accordance with W.A.T.C.H. Manual.
TASK E: Traffic Study/Report – As necessary.
TASK F: Environmental (CEQA) – As necessary,
TASK G: Right-of-Way Acquisition and Temporary Construction Easements (TCEs) – Right-of Way acquisition as necessary.
HZ will incorporate the preferred precise alignment into the Vi8 CADD Files. Plans will be evaluated and TCE’s would be provided, if necessary.
TASK H: Drainage - Huitt-Zollars proposes to implement the recommendations from the draft Citywide FLO-2D model that accounts for backwater effects on the storm drain infrastructure. Sizing of the infrastructure will be based on both hydrology and hydraulic computations to be prepared as part of the drainage report. A preliminary drainage report will be created along with the 30% submittal.
A final drainage report will be provided with the final submittal.
TASK I: Water Quality Management Plan (WQMP)
Sub-Task I.1 – The design will account for the 50% rule in the 2009 MS4 Permit, which requires treatment for 50% of added or replaced impervious areas. It will implement green street principles to the maximum extent practicable. If the underlying soil does not infiltrate we anticipate using the parkway to provide bio-filtration. HZ will prepare a Preliminary WQMP at the 30% stage that identify potential locations for LID BMPs and their interactions with the onsite storm drain network. HZ will develop the Preliminary WQMP into a Final WQMP consistent with the County’s Technical Guidance Manual to accompany the final submittal. This will include an engineer’s estimate of probable costs inclusive of material, freight, and maintenance for the selected BMPs.
Sub-Task I.2 SWPPP – Deferred: Construction Bid Task
TASK J: Plans, Specifications, and Estimates (PS&E) - HZ will adhere to city criteria, policies, procedure, and standards. PS&E includes three milestone deliverables – 30%, 60%, and Final. Each milestone will commence after HZ has received review comments from the previous milestone submittal. HZ will meet with the City after comments have been reviewed to resolve questions. All plan sheets will be prepared at 20 scale unless otherwise approved and noted.
Sub-Task J.1 Street Improvements – HZ will match the precise alignment of the constructed street. Plans will include record information regarding utilities, obstructions, and appurtenant data.
Sub-Task J.2 Traffic Design
Street Signals
Channelization Plan & Details – Plans will be completed to meet California MUTCD standard, signage will be evaluated and updated for proposed lane configuration.
Temporary Traffic Control Plans – Deferred: Construction Bid Task Sub-Task J.3 Storm Drain Design - Drainage improvement plans will be prepared at the different milestones. Backbone storm drain profiles will be provided along with the 30% submittal. Profiles for lateral storm drains and storm drain detail sheets will be provided at the 60% and final submittals.
Sub-Task J.4 Wall Design – Design of masonry wall height as specified by sound report or City but not to exceed 12 feet Sound Report – Provided by City
Sub-Task J.5 Street Lighting & Electrical Design – Typically existing street lights are owned by SCE. If the proposed improvements relocate more than three street lights the proposed lights will be owned by the City of Santa Ana. Street lighting design standards will be coordinated with the City of Santa Ana prior to commencing the design. The design will be per City of Santa Ana lighting standards and consideration will be given to salvaging the existing light fixtures.
Sub-Task J.6 Landscaping and Irrigation Design – Conceptual landscape and irrigation plans will be prepared in conformance with City of Santa Ana standards. Our landscape designers will work closely with our engineers to plan, design, and coordinate gateway features, public art, traffic, and pedestrian lighting, signage, and site amenities. Our team will coordinate with the City to responsibly design landscape and irrigation systems. Planting and irrigation will be mindful of water conservation standards.
Sub-Task J.7 Dry Utilities – Undergrounding existing powerlines is possible if SCE accepts proposed switch locations. As described in the approach coordination with SCE would occur in two phases. Our current scope is limited to street design. HZ will coordinate City Council 20 – 164 5/16/2023 14 City of Santa Ana Civil Engineering Services: RFP 23-030 with third party purveyors to find feasible alignments for dry utility. The proposed alignment would be incorporated into a conflict exhibit for evaluation. The coordination is limited to the street improvement design period.
Sub-Task J.8 Specifications – HZ will utilize City of Santa Ana standard bid specifications and/or the latest edition of the Standard Specifications for Public Works Construction and edit them to fit the project requirements.
Sub-Task J.9 Estimates of Probable Cost – HZ will prepare estimates of probable cost for the proposed improvements.
Sub-Task J.10 Utility Plans – HZ will prepare utility plans this includes an option for potholes to investigate existing utility size and depth. Further investigation will be necessary where record information is unreliable and thought to cause a conflict with proposed improvements. Existing manholes will be dipped where possible to verify inverts and pipe size. Notices will be sent to impacted utility companies and every effort will be made to resolve conflicts prior to 60% submittal.
Sub-Task J.11 Disposition Plans – Removals are limited to infrastructure within project limits Sub-Task J.12 Water Well Rehabilitation Plan
Sub-Task J.13 Offsite Improvement Plans - Excluded
TASK K: Construction Administration Services (Optional) Sub-Task K.1 Bid Support – HZ will be available to attend the pre-bid meeting. Our team will review contractor’s RFIs if requested by the City during the bidding phase.
Sub-Task K.2 Construction Support – HZ will participate in construction meetings if necessary. HZ will review submittals and shop drawings required to support the construction contract. Reviews will be completed within 10 working days of receipt. Contractor change orders will be completed within two working days of receipt. HZ will be available as requested by the City to resolve discrepancies in contract documents. HZ will furnish necessary revisions to documents due to errors and/or omission at no cost.
Sub-Task K.3 Record Drawings – The contractor shall provide as-built redlines, HZ will revise approved plans per contractor comments to produce record drawings.
Sub-Task K.4 Project Close-Out - HZ will assist in the development of the project punch list as related to the construction package prepared by our team.
1. Title Sheet
2. Index Sheet
3. Disposition Plan
4. Street Improvement Plans (5 sheets)
5. Details & Typical Cross
Sections
6. Storm Drain Improvements (2 sheets)
7. Drainage Details
8. Signing & Striping Plans (3 sheets-double stacked)
9. Signing & Striping Details
10. Sound Wall Plan - (3 sheets)
11. Sound Wall Details
12. Streetlight Plan (3 sheets double stacked)
13. Streetlight Details
14. Landscape & Irrigation Plan (3 sheets-double stacked)
15. Landscape & Irrigation Details
Typical Street Improvement set will include:
City Council 20 – 165 5/16/2023
15 City of Santa Ana Civil Engineering Services: RFP 23-030
MILESTONE DUE DATE
Kick-Off Meeting May 4
Records Research June 1
Base CADD File June 29
Geotechnical Report July 27
Drainage Report July 27
Plans, Reports, Specifications, and Estimates 30% September 14 Plans, Reports, Specifications, and Estimates 60% December 7 Plans, Reports, Specifications, and Estimates 100% March 1 Bidding Period April-May
Kick-off Construction June
DESIGN SCHEDULE
3 FEE PROPOSAL
Please find our Fee Proposal in the separate sealed envelope labeled "Fee Proposal."
APPENDIX
Attachment 3-1 Non Collusion Affidavit
Attachment 3-2 Non-Lobbying Certification
Attachment 3-3 Non-Discrimination Certification
4 CERTIFICATIONS
City Council 20 – 166 5/16/2023
City Council 20 – 167 5/16/2023
City Council 20 – 168 5/16/2023
City Council 20 – 169 5/16/2023
City Council 20 – 170 5/16/2023
City Council 20 – 171 5/16/2023
HZ
MISSION STATEMENT
HUITT-ZOLLARS
2603 Main Street, Suite 400
Irvine, CA 92614
(949) 988-5815
www.huitt-zollars.com
Our commitment is to understand the needs of our
clients and to meet those needs by delivering professional services with the highest level of quality & integrity.
City Council 20 – 172 5/16/2023
EXHIBIT C
COMPENSATION
Consultant’s Fee Proposal including hourly rates if applicable City Council 20 – 173 5/16/2023
FEE PROPOSAL
Engineering/Architecture Survey
Principal $ 325.00 Survey Manager $ 280.00
Sr. Project Manager $ 300.00 Sr. Project Surveyor $ 220.00 Design Principal $ 260.00 Project Surveyor $ 155.00
QA Manager $ 250.00 Survey Technician $ 125.00
Project Manager $ 250.00
Sr. Civil Engineer $ 240.00
Sr. Structural Engineer $ 270.00 Survey Crews
Sr. Mechanical Engineer $ 250.00
Sr. Electrical Engineer $ 225.00 1-Person Survey Crew $ 200.00 Civil Engineer $ 185.00 2-Person Survey Crew $ 305.00
Structural Engineer $ 195.00 3-Person Survey Crew $ 395.00 Mechanical Engineer $ 180.00
Electrical Engineer $ 180.00
Plumbing Engineer $ 180.00 Construction
EIT $ 160.00
Sr. Architect $ 215.00 Construction Manager $ 180.00
Sr. NL Architectural Staff $ 200.00 Resident Engineer $ 165.00 Architect $ 200.00 Inspector/Owner's Representative $ 130.00 Architect Intern 3 $ 175.00 Sr. Project Representative $ 125.00 Architect Intern 2 $ 135.00 Resident Project Representative $ 100.00 Architect Intern 1 $ 120.00
Sr. Landscape Architect $ 225.00
Landscape Architect $ 160.00
Landscape Architect Intern $ 120.00 Administrative
Sr. Designer $ 195.00 Sr. Project Support $ 120.00
Designer $ 160.00 Project Support $ 110.00
Sr. CADD Technician $ 145.00
CADD Technician $ 120.00
Southern California
2023
HOURLY RATE SHEET
City Council 20 – 174 5/16/2023