The Keetch-Byram Drought Index (KBDI) represents a simplified proxy for favorability of occurrence and spread of wildfire. The KBDI incorporates climate data from global circulation models (GCMs) like changing temperature and precipitation patterns to describe soil moisture deficit, as research and history consistently demonstrate that hot and dry conditions are conductive to wildfires. The KBDI scale captures heat and moisture conditions, ranging from 0 to 800, with lower scores indicating higher levels of soil saturation and low wildfire risk and higher scores indicating soil moisture deficits and high wildfire risk.
Table 2 summarizes the wildfire risk for KBDI values.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 17
Table 2 KBDI Values and Corresponding Wildfire Risk Levels KBDI
Value
Description Wildfire Risk
0-200 Soil moisture and fuel
moistures are high
Low wildfire risk.
200-400 Soil and fuels start to dry Average wildfire risk. 400-600 Onset of drought Moderate to serious wildfire risk. 600-800 Severe drought Extreme wildfire risk and increased wildfire occurrence.
KBDI values greater than 600 can help to provide a high-level evaluation of whether wildfire activity is likely to increase. Figure 17 shows Cal-Adapt projections for the number of days with KBDI values greater than 600 for present, mid-century, and end-of-century for the City of Santa Maria.
Figure 17 Number of Days with KBDI > 600 (RCP 8.5)
Although the City's wastewater service area is in a low-risk fire hazard area, the City and the surrounding area can expect to see an increase in the number of days with KDBI values greater than 600, representing the number of days with extreme wildfire risk and increased wildfire occurrence, through end-of-century.
2.1.5 Increased Power Outages
Power outages from extreme weather are increasing across the United States. The average number of major power outages (exceeding 50,000 customers) increased by roughly 64 percent during 2011-2021.
Extreme heat events are increasing in frequency and duration, and high temperatures increase powerline sagging and reduce the efficiency of transmission and distribution, stressing the grid during periods of increased demand.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 18
The City receives all commercial power from Pacific Gas and Electric and is near the end of its distribution system, making it more susceptible to power disruptions (as any failure is more likely to occur between the end and the origin(s) of the system). The Santa Maria WWTP facility operations are dependent on power generation and distribution networks and are vulnerable to operation failures, extreme storm events, and high demand periods that may cause brownouts or blackouts. The City currently has full capability to provide generator power to operate the Santa Maria WWTP during a prolonged power outage. Additional measures to provide backup power may be needed in the future due to the predicted increase in power outages.
2.1.6 Summary of Climate Change Hazards
Table 3 summarizes the range of climate change hazards in the City's service area that were evaluated in the preceding sections.
Table 3 Summary of Climate Change Hazards in Santa Maria Hazards Projected Trends
Sea Level Rise +1.1 feet by 2050
+6.3 feet by 2100
Precipitation
Average annual precipitation:
» +0.9 inch mid-century
» +2.4 inch end-century
Increase in intensity of extreme precipitation events Drought
Maximum length of dry spell:
» +7 days mid-century
» +12 days end-century
Increasing intensity of drought conditions
Increasing frequency and duration of dry weather conditions Flooding 100-year flood increase near rivers
Increase in intensity of extreme precipitation events Extreme Temperatures
Increase in maximum temperatures
Increase in minimum temperatures
Increase in extreme heat days
Increase in number of warm nights
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 19
Hazards Projected Trends
Wildfires
City of Santa Maria:
» 14 days with extreme wildfire risk by mid century
» 42 days with extreme wildfire risk by end century
Power Outages More frequent power outages.
2.2 Vulnerability Assessment
The vulnerability assessment evaluated the degree to which each of the City's wastewater systems is susceptible to, and unable to handle, each of the identified climate change hazards. The vulnerability assessment was performed for current and historical conditions to establish the current vulnerabilities as well as for future conditions, incorporating climate change, to estimate future vulnerabilities. The City's Local Hazard Mitigation Plan and the Santa Barbara County Multi-Jurisdictional Hazard Mitigation Plan provided additional information on assessing the vulnerability of the City's service area.
2.2.1 Methodology for Assessing Vulnerability
The methodology for assessing the vulnerability of the City's wastewater systems follows the process recommended by the California Governor's Office of Emergency Services, as documented in the 2020 California Adaptation Planning Guide and the Climate Adaptation Guide by the California Department of Water and Resources. The process of assessing vulnerability has four steps: exposure, sensitivity, adaptive capacity, and vulnerability scoring. These steps are described below.
2.2.1.1 Exposure
The first step of the vulnerability assessment involves identifying the specific climate hazards that could impact the City's wastewater systems. This is accomplished by describing historical hazards and describing how these hazards are expected to change. This step is described in Section 2.1 of this CCAP and summarized in Table 2.
2.2.1.2 Sensitivity
The goal of the second step of the vulnerability assessment is to characterize past and potential future climate impacts to the City's wastewater treatment processes and/or critical structures at the WWTP. Key considerations include the aging infrastructure of facilities at the WWTP, operational capacity, and energy dependence. The sensitivity of the system to current climate and climate changes is assessed through a three-point rating scale ranging from low to high. The sensitivity rating is based on the responsiveness of the system to changes in climate without consideration of the ability to adapt. Table 4 defines the rating scale for sensitivity.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 20
Table 4 Sensitivity Rating Scale
Level Descriptor Description
1 Low Climate and climate changes have little to no influence on asset or operations. 2 Moderate Climate and climate changes have influence on asset or operations. 3 High Climate and climate changes have high influence on asset or operations.
2.2.1.3 Adaptive Capacity
The adaptive capacity is assessed based on the ability of the current wastewater system, operations, or management to adapt with little or no changes in the current system function or operational/management structure. Factors influencing adaptive capacity include infrastructure upgrades, resources availability, and institutional support. As with the sensitivity rating, a three-point rating scale is also used for adaptive capacity. Table 5 defines the rating scale for adaptive capacity.
Table 5 Adaptive Capacity Rating Scale
Level Descriptor Description
1 Low System component has little inherent capacity to adapt to climate induced changes. 2 Medium System component has some inherent capacity to adapt to climate induced changes. 3 High System component has substantial inherent capacity to adapt to climate induced changes.
2.2.1.4 Vulnerability Scoring
The combined rating of sensitivity and adaptive capacity results in an assessment of vulnerability.
A system component that is highly sensitive (High) to climate changes and has little adaptive capacity (Low) represents a high vulnerability. However, not all system components that show high sensitivity to climate are considered highly vulnerable. If substantial operational flexibility exists to adapt to such changes, then the component may be considered to have only low to moderate vulnerability. Table 6 illustrates how the sensitivity and adaptive capacity scores lead to a vulnerability score, and Table 7 defines the scale that was used to score vulnerability.
Table 6 Vulnerability Scoring
Sensitivity
Adaptive Capacity
Low = 1
Low = 1 Moderate = 2 High = 3
M H H
Moderate = 2 L M H
High = 3 L L M
Table 7 Vulnerability Rating Scale
Descriptor Description
Low Minimal risk, existing systems can manage the impact of climate change.
Moderate Noticeable risk, infrastructure upgrades, or operations may need improvements.
High Immediate or severe risk, current systems cannot manage the impact without major adaptation.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 21
2.2.2 Vulnerability Assessment Results
The following sections summarize the results of the vulnerability assessment performed on each of the identified climate change hazards for the City's service area.
2.2.2.1 Sea Level Rise
Climate change projections for sea level rise in Santa Barbara County estimate an increase of 6.3 feet by 2100. However, the Santa Maria WWTP is located 10 miles inland from the coastline and sits at an elevation of 150 feet above mean sea level. Therefore, future sea level rise is not anticipated to impact the WWTP directly. Projected indirect impacts to the WWTP include increased groundwater levels that could slow infiltration rates of the percolation ponds and the potential for saltwater intrusion affecting local groundwater quality. In areas within the City's service area with high groundwater, infiltration could increase into sewer lines. Table 8 details the results of the vulnerability assessment performed for sea level rise.
Table 8 Vulnerability Assessment - Sea Level Rise
Assessment Score Justification
Sensitivity 1
Low
The plant is 10 miles inland and 150 feet above mean sea level, reducing direct risks.
Adaptive Capacity 2
Moderate
Groundwater monitoring wells are in place to monitor groundwater levels, and adjustments to effluent discharge methods can be developed in the future, if needed.
Vulnerability Score Low
Minimal risk, existing groundwater monitoring wells can monitor groundwater and adjustments to existing disposal methods (if needed) can manage the indirect impact of sea level rise.
2.2.2.2 Precipitation
Climate change projections for annual precipitation in the City's service area indicate an increase of
2.4 inches of rain annually by end of the century and an increase in the intensity of rain events. This increase could lead to increased inflow and infiltration (I&I) during heavy rainfall events, potentially overwhelming the primary and secondary treatment capacity of the WWTP and impacting the existing percolation ponds. Additionally, the increased I&I can lead to sanitary sewer overflows in the City's service area. Table 9 details the results of the vulnerability assessment performed for precipitation pattern changes.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 22
Table 9 Vulnerability Assessment - Precipitation Pattern Changes Assessment Score Description
Sensitivity 2
Moderate
An increase in precipitation will cause an increase in I&I during heavy rainfall events. The collection system is potentially susceptible to sanitary sewer overflows, and peak flows could overwhelm screening capacity at the headworks, lower solids settling efficiency in primary clarifiers, and disrupt biological treatment. Low evaporation and higher flows during rainfall events may require additional disposal capacity than currently available.
Adaptive Capacity 2
Moderate
The existing WWTP infrastructure has capacity to deal with excess raw sewage inflows, however the existing percolation ponds have limited capacity to provide long term additional storage after extreme precipitation events. As part of the plant expansion, plant treatment processes and hydraulics will be designed for increased projected wet weather flows, and additional percolation ponds will be constructed at the WWTP for additional disposal capacity.
Vulnerability Score Moderate
On the treated effluent side, additional percolation ponds will provide additional volume that can be used during extreme precipitation events. The City's collection system is potentially susceptible to sanitary sewer overflows during heavy rainfall due to the increase in intensity of rainfall events. The collection system may require improvements to convey higher flows.
2.2.2.3 Drought
Climate change projections indicate that California will continue to experience more frequent and intense droughts through the end of the century. Additionally, the intensity, frequency, and duration of dry weather conditions are expected to increase. In the City's service area, the maximum length of a dry spell is expected to increase by 12 days by the end of the century. Extended periods of drought have the potential to reduce influent flow rates to the WWTP, concentrating sewage and challenging treatment efficacy, and may cause potential regulatory shifts toward reuse and conservation mandates. Table 10 details the results of the vulnerability assessment performed for drought.
Table 10 Vulnerability Assessment - Drought
Assessment Score Description
Sensitivity 3
High
During drought conditions, the population uses less water, leading to higher sewer concentrations entering the Santa Maria WWTP. High sewage concentration can stress the treatment capacity of the secondary treatment system.
Adaptive Capacity 3
High
California has experienced drought many times in the last century. Thus, the Santa Maria WWTP is sized to adapt to drought conditions. Additionally, the City is only expected to see an increase of 12 days in the length of dry spells.
Vulnerability Score Moderate
Existing infrastructure has been sized to adapt to drought conditions, and the projected increase in the length of dry spells is not anticipated to increase greatly. As part of the plant expansion, plant treatment processes will be designed for organic and nutrient loads based on a range of anticipated influent flow and concentration, including drought conditions.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 23
2.2.2.4 Flooding
Climate change projections indicate that the intensity of precipitation events is expected to increase by the end of the century, which can lead to coastal and river flooding. Historically, the Santa Maria WWTP has never experienced flooding because the WWTP sits above flood-prone areas. However, the WWTP may experience localized flooding due to an increase in the intensity of precipitation events, which can damage infrastructure and disrupt treatment operations. Table 11 details the results of the vulnerability assessment performed for flooding.
Table 11 Vulnerability Assessment - Flooding
Assessment Score Description
Sensitivity 1
Low
The WWTP is located at a higher elevation than flood-prone areas and is not located in a flood zone.
Adaptive Capacity 2
Moderate
The City has a stormwater management plan and an emergency response plan for severe weather and flooding.
Vulnerability Score Low
As part of the plant expansion, existing and new electrical equipment at the WWTP will be evaluated to confirm that it is elevated sufficiently to prevent localized flooding of equipment.
2.2.2.5 Extreme Temperatures
Climate change projections indicate that the City's service area is expected to see an increase in maximum temperatures and an increase in minimum temperatures as the century progresses. An increase in the number of extreme heat days and number of warm nights is also expected to increase. However, as shown in Table 1, the projected temperatures are not very high and do not pose a threat to the WWTP facilities or operations. Table 12 details the results of the vulnerability assessment performed for extreme temperatures.
Table 12 Vulnerability Assessment - Extreme Temperatures Assessment Score Description
Sensitivity 1
Low
The projected maximum temperatures in the City's service area are not very high and are not anticipated to affect the WWTP.
Adaptive Capacity 2
Moderate
The WWTP process is not significantly impacted by increases in ambient temperature and has limited ability to control temperature. The rise in temperatures will not necessitate any additional actions.
Vulnerability Score Low Although an increase in temperature is anticipated, the projected maximum temperatures will not necessitate any additional actions.
2.2.2.6 Increased Wildfire
Climate change projections indicate that the City will have more days with high wildfire risk (KBDI > 600) annually as the century progresses. However, because the City's service area is located within a low fire risk hazard zone, an increase in wildfire occurrence does not pose a threat to the wastewater system.
Table 13 details the results of the vulnerability assessment performed for increased wildfires.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 24
Table 13 Vulnerability Assessment - Increased Wildfires Assessment Score Description
Sensitivity 1
Low The City's service area is located in an area of low wildfire risk.
Adaptive Capacity
2 Moderate
Wildfires can lead to increased power outages; however, existing backup generators and new renewable energy projects (solar panels) can reduce risks.
Vulnerability Score Low
The City already has full backup power available for the existing WWTP. Full backup power will be commissioned as part of the new WWTP upgrade, along with additional energy management systems. No additional actions will be needed.
2.2.2.7 Increased Power Outages
As temperatures become warmer, drought conditions intensify, wildfires become more frequent, and the number of power outages is expected to increase. This has the potential to lead to WWTP plant shutdowns causing permit violations, loss of aeration, pumping and chemical dosing systems, and potential effluent quality deterioration. Table 14 details the results of the vulnerability assessment performed for increased power outages.
Table 14 Vulnerability Assessment - Increased Power Outages Assessment Score Description
Sensitivity 3
High
The WWTP relies on consistent power. Higher temperatures and other conditions associated with climate change could increase the frequency of power outages.
Adaptive Capacity 3
High
The existing backup generator is sufficient to power the entire WWTP facility during a power outage, and there is onsite fuel to refuel the generator. The upgraded WTP facility will be designed and constructed to have sufficient backup power resources to mitigate risks associated with power outages.
Vulnerability Score Moderate
The City has a standby generator for backup power for the entire WWTP facility and emergency response procedures for power outages. This backup power source will not be sufficient to meet the power needs of the WWTP upgrade, but the City is planning to include sufficiently sized standby generator(s) as part of the Phase 1 plant expansion.
2.2.3 Vulnerability Assessment Summary
Table 15 summarizes the results of the vulnerability assessment and organizes the City's wastewater system's vulnerability to the identified climate change hazards from high to low vulnerability.
Table 15 Vulnerability Assessment - Summary
Hazard Vulnerability
Rating Rational
Increased Power
Outages
Moderate The City has a planned project to add solar power and, as part of the master planning effort, is considering other renewable energy options and backup generators sufficient for providing backup power for the new facilities.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 25
Hazard Vulnerability
Rating Rational
Increased
Precipitation
Moderate The City has a robust sewer line cleaning and inspection program outlined in the adopted Sewer System Management Plan. As part of the cleaning and inspection program, the City routinely finds and reports issues, some of which can be attributed to increasing I&I. Once the issue has been identified and confirmed, repairs are performed. If the issue is a greater item of concern than a spot repair, then that issue is developed into a capital replacement project. Additionally, the City utilizes a third-party consultant to assist with sewer modeling and utility capacity. An element of the modeling and capacity evaluation is monitoring flows both during dry and rainy seasons to help inform the City of the impacts of I&I. As part of the continued evaluation, the City can monitor and address I&I. If monitoring and modeling demonstrate significant I&I issues, then the City can evaluate the need for developing a future I&I program. Additional percolation ponds planned as part of the Master Plan will increase disposal capacity for treated effluent.
New facilities will be designed to handle projected peak influent flows.
Drought Moderate Forecasted drought conditions are not anticipated to be significantly different from the present, in terms of number of dry days per year. Forecasted drought conditions are not expected to have a significant impact on the existing or future WWTP infrastructure needs. New facilities will be designed to handle projected organic and nutrient loads.
Floods Low The Santa Maria WWTP has never experienced flooding due to its elevation.
Existing and new electrical equipment at the WWTP will be evaluated to confirm that it is elevated sufficiently to prevent localized flooding of equipment.
Extreme
Temperatures
Low Extreme temperatures are unlikely to have a significant impact to the existing WWTP infrastructure.
Increased Wildfire Low The City's service area is located in a low fire hazard area.
Sea Level Rise Low The City's service area is located far from the coast at an elevation of more than 160 feet above mean sea level, so there is no direct risk.
SECTION 3 RESILIENCY ACTIONS
The Santa Maria WWTP faces increasing climate hazards, including precipitation pattern changes, flooding, drought, extreme temperatures, wildfires, and power outages. For each of the climate change hazards that the City's wastewater service area is moderately vulnerable to, resiliency actions have been identified. The resiliency actions described in Table 16 have been identified to enhance system resilience while minimizing resource impacts to provide continued operation, protect water quality, and comply with regulatory requirements.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 26
Table 16 Resiliency Actions for the Santa Maria Wastewater System Resiliency Action Hazards
Addressed Description of Action
Update Collection
System Model and
CIP with projects to
reduce I&I as needed
Increased
Precipitation
The City has an ongoing project to update the collection system hydraulic model. This new model will identify any sections of the collection system that are under capacity for dealing with projected high flows. A CIP will be developed for improvements required in the collection system to address capacity limitations and to address Inflow and Infiltration (I&I) that may contribute to capacity limitations.
Backup Power
Upgrades
Power Outages, The Santa Maria WWTP currently has a backup generator that can provide power to the whole plant during power outages. Additionally, the WWTP and the City have fueling capabilities to provide fuel to the generator for extended power outages.
As part of the Phase 1 plant expansion Master Plan, the City is conducting an Energy Management evaluation that will consider future resiliency, backup generator(s) to provide power for the entire facility, and alternatives for renewable energy to address increasing and extended power outages.
WWTP Upgrades Increased
Precipitation,
Drought
Currently, the WWTP has an hydraulic capacity of 13.5 million gallons per day.
As part of the Phase 1 plant expansion, the existing infrastructure will be updated or replaced to provide additional capacity for projected wet weather flows and additional concentrations of sewage during drought. Additional percolation ponds are planned as part of the Phase 1 plant expansion for increased disposal capacity.
Drainage improvements to increase capacity of onsite storm drains will also be completed as part of this project.
Emergency
Response Plan
Power Outages, Emergency plans and procedures can assist in increasing the resilience of the WWTP.
The existing WWTP's 2024 Operations and Maintenance Manual incorporates an Emergency Response Program, which includes responses and procedures for power outages.
The WWTP upgrade project would include an updated Operations and Maintenance Manual with an Emergency Response Plan that would include responses and procedures for power outages.
Notes:
CIP - capital improvement program
SECTION 4 ADAPTATION STRATEGY
Adaptation is the process of making changes in response to current or future conditions. Based on the results of the vulnerability assessment and the resiliency actions described in Section 3, an adaptation strategy was developed.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 27
4.1 Prioritization of Resiliency Actions
The prioritization of the identified resiliency actions was based on the following:
Risk to Water Quality - The risk to water quality assessed how urgently the identified resiliency action needs to be implemented to prevent regulatory non-compliance or system failures associated with climate change hazards. The higher the risk to water quality, the higher the potential for system failure, service disruption, permit violations, or contamination risks if the resiliency action is not implemented, and the greater the urgency of resiliency action. Cost-Benefit Analysis - The cost-benefit analysis evaluates the economic, environmental, and operational impacts of implementing climate resiliency actions. The analysis compares implementation and sustaining costs against anticipated benefits including: avoiding damages, improved water quality, regulatory compliance, and improved operational efficiency over a 25-year time frame.
Table 17 lists the prioritization of resiliency actions.
Table 17 Prioritization of Resiliency Actions
Priority Resiliency Action Risk to Water Quality Cost-Benefit Analysis 1 WWTP Upgrades Very High
Aging infrastructure reduces
treatment efficiency, increasing
effluent quality risks.
Cost: Current Estimate for Phase 1 is $485
million.
» Includes upgrading and replacing structures
as part of the Phase 1 expansion project.
Estimated Benefit: Significant due to improved
treatment efficiency lending to improved water
quality and a lower possibility of water quality
violations and reduced failures.
Cost-Effectiveness = High
2 Backup Power
Upgrades
High
Ensures plant operation during
power outages, reducing risk of
bypass.
Cost: Included in Phase 1 Project lists above.
» Cost for backup power and emergency
generators.
Estimated Benefit: Significant due to avoided
operational disruptions, emergency repairs and
regulatory violations.
Cost-Effectiveness = High
3 Update Collection
System Model and CIP,
which incorporates
monitoring and
evaluation of I&I and
development of CIP for
I&I issues as needed
High
More intense storm events can
cause high I&I rates, which can
lead to sanitary sewer
overflows. Model will identify
risk areas. If identified, CIP will
lay out projects to address
capacity deficiencies and I&I
reduction.
Cost: $450,000
» Cost for recalibration of water and sewer
models, surveying of manholes, and an
updated utilities capacity study.
Estimated Benefit: Significant due to identifying
areas within the collection system where
improvements could be made to avoid possible
sanitary system overflows.
Cost-Effectiveness = High
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 28
Priority Resiliency Action Risk to Water Quality Cost-Benefit Analysis 4 Emergency
Preparedness and
Response Plan
Moderate
Enhances staff readiness,
minimizing disruptions.
Cost: To develop a new Emergency Response
Program chapter of the O&M Manual for the new
Phase 1 project would be included in the overall
cost of the Phase 1 project. An annual cost of
$5,000 to train staff would be on-going and
incorporated as part of the normal operating
budget.
» Includes creating and updating emergency
response program in the WWTP O&M
Manual for the Phase 1 project.
» Annual staff training on the Emergency
Response Program.
Estimate Benefit: Significant because it will
prepare plant staff to better deal with crisis
response situations.
Cost-Effectiveness = High
4.2 Schedule and Milestones for Selected Actions
The implementation schedule outlines the timeline for implementing each prioritized resiliency action, considering climate change hazards, critical milestones, and potential triggers for climate related events that may necessitate acceleration or re-prioritization of certain actions and is summarized in Table 18.
Table 18 Schedules and Milestones of Resiliency Actions Resiliency Action Milestone Target Completion
Date Description
Emergency
Preparedness and
Response Plan
Develop emergency response
procedures
At commissioning of
WWTP Phase 1
Upgrades
Update emergency procedures to
handle power outages, flooding,
wildfire, etc. to be current with the
WWTP Upgrades project.
Backup Power
Upgrades
Install emergency generator(s) at
WWTP for Phase 1 Project
At commissioning of
WWTP Phase 1
Upgrades
As part of WWTP Upgrades
project
Update Collection
System Model and CIP
with projects to reduce
I&I as needed
Complete identification and
assessment of collection system
Approximately
2 years from
completion of City's
General Plan
Update
Evaluate which sections of the
collection system are under
capacity to deal with future
projected flows.
Develop CIP Approximately
2 years from
evaluation of
system.
CIP for improvements to the
collection system will be
completed.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 29
Resiliency Action Milestone Target Completion
Date Description
WWTP Upgrades Complete Master Plan 2026 Develop planning documents necessary for upgrades. Include
climate resilience considerations
in plan.
Design 2029 Preparation of Construction
Documents. Include climate
resilience considerations in
design.
Construction 2033 Complete installations, validate
operations, and conduct
functional testing of the upgraded
system.
4.3 Financial Planning
To minimize financial burden, the City should pursue a multi-source funding approach, combining federal, state and local sources. Table 18 outlines the identified resiliency actions, projected costs (both for implementation and sustaining), potential funding sources, and the funding strategy to secure necessary resources.
Table 19 Resiliency Actions and Funding Strategy
Resiliency Action
Estimated
Implementation
Cost
Estimated
Annual
Sustaining Cost
Potential Funding
Sources Funding Strategy
WWTP Upgrades
(Including Backup
Power Upgrades and
Emergency
Preparedness and
Response Plan)
$485 million
Backup Power
Upgrades -
$20,000
FEMA BRIC
program
Utility PPA
Public-Private
Partnerships (PPP)
Work on applying for grants
or consider PPP or PPAs.
Annual costs would be part of
the operating budget.
Emergency
Preparedness
and Response
Plan - $5,000
City Biannual
Budget
Integrate costs into annual
operations and maintenance
budget.
Annual O&M
Costs for
Phase 1 Project -
$5 million
User Rate
Adjustments
Conduct a Cost-of-Service
Study to identify rate
adjustment needs.
CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 30
Resiliency Action
Estimated
Implementation
Cost
Estimated
Annual
Sustaining Cost
Potential Funding
Sources Funding Strategy
Update Collection
System Model and CIP $450,000
Cost to
implement CIP
per year is
unknown and
variable.
SRF
Local Bonds
Growth Mitigation
City Biannual
Budget
Apply for low-interest SRF
loans.
Integrate upgrades into city
budget.
Notes:
BRIC - Building Resilient Infrastructure and Communities; CWSRF - Clean Water State Revolving Fund; FEMA - Federal Emergency Management Agency; PPA - Power Purchase Agreement; PPP - Public-Private Partnerships; SRF - State Revolving Fund
SECTION 5 RECYCLED WATER FEASIBILITY PLAN
The recycled water feasibility plan required as part of this report was prepared and is included in the Master Plan, Volume 7 - Water Reuse and Liquid Disposal.
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX N POTENTIAL FUTURE REGULATIONS FOR
PERCOLATION POND OPERATION
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN N-1
Constituent Beneficial Uses That
Apply to Each
Constituent
Current Water Quality Objectives Future Water Quality Objectives
MUN AGR
(irrigation)
AGR
(livestock)
Units MUN AGR Units
Phenol MUN 0.6 (NL-archive)
2.0 (HA)
-- -- mg/L -- -- --
Formaldehyde MUN 0.1 (NL) -- -- mg/L -- -- --
Zinc MUN, AGR 5.0 (Secondary MCL) 2 25 mg/L -- -- --
Chromium VI MUN -- -- -- -- 0.01 (Primary MCL) -- mg/L
Mercury MUN, AGR 0.002 (Primary MCL) -- 0.01 mg/L Under Development
-- --
Selenium MUN, AGR 0.05 (Primary MCL) 0.02 0.05 mg/L -- -- -- TTHMs (bromoform, chloroform, DBCM,
DCBM)
MUN 0.08 (Primary MCL) -- -- mg/L Under
Development
-- --
HAA5 (monochloroacetic acid,
dichloroacetic acid, trichloroacetic acid,
monobromoacetic acid, dibromoacetic acid)
MUN 0.060 (Primary MCL) -- -- mg/L Under
Development
-- --
Bromate MUN 0.01 (Primary MCL) -- -- mg/L Under
Development
-- --
Chlorite MUN 1.0 (Primary MCL) -- -- mg/L Under
Development
-- --
Aluminum MUN, AGR 1.0 (Primary MCL) 5.0 5.0 mg/L -- -- -- Manganese MUN, AGR 0.05 (Secondary MCL)
0.5 (NL)
0.2 -- mg/L 0.02 (NL)
0.20 (RL)
-- mg/L
Perchlorate MUN 0.001 (PHG) -- -- mg/L Under
Development
-- --
MTBE MUN 0.013 (Primary MCL) -- -- mg/L -- -- --
Arsenic MUN, AGR 0.010 (Primary MCL) 0.1 0.2 mg/L Under Development
-- --
Cadmium MUN, AGR 0.005 (Primary MCL) 0.01 0.05 mg/L Under Development
-- --
NDMA MUN 0.00001 (NL) -- -- mg/L Under
Development
-- --
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN N-2
Constituent Beneficial Uses That
Apply to Each
Constituent
Current Water Quality Objectives Future Water Quality Objectives
MUN AGR
(irrigation)
AGR
(livestock)
Units MUN AGR Units
Styrene MUN 0.1 (Primary MCL) -- -- mg/L Under
Development
-- --
1,4-Dioxane MUN 0.001 (Primary MCL) -- -- mg/L Under
Development
-- --
PFOA MUN 5.1 (NL)
10 (RL)
0.004 (HA)
-- -- ng/L Under
Development
(CA MCL)
4 (EPA MCL)
-- ng/L
PFOS MUN 6.5 (NL)
40 (RL)
0.02 (HA)
-- -- ng/L -- ng/L
PFBS MUN 500 (NL)
5000 (RL)
2000 (HA)
-- -- ng/L 1.0 (Hazard Index -
EPA MCL)
-- unitless
PFHxS 3 (NL)
20 (RL)
Gen X (HFPO-DA) 10 (HA)
PFNA --
Anatoxin-a MUN -- -- -- -- 4 (NL) -- µg/L
Saxitoxins MUN -- -- -- -- 0.6 (Interim NL) -- µg/L
Microcystins MUN -- -- -- -- 0.03 (Interim NL) -- µg/L
Cylindrospermopsin MUN -- -- -- -- 0.3 (Interim NL) -- µg/L Notes:
-- - none/not applicable; µg/L - micrograms per liter; DBCM - chlorodibromomethane; DCBM - bromodichloromethane; EPA - United States Environmental Protection Agency; HA - health advisory; HAA5 - haloacetic acids; HFPO-DA- hexafluoropropylene oxide dimer acid; MCL - maximum contaminant level; mg/L - milligrams per liter; MTBE - methyl tert-butyl ether; NDMA - N-Nitrosodimethylamine; ng/L - nanograms per liter; NL - notification level; PFBS - perfluorobutanesulfonic acid; PFHxS - perfluorohexane sulfonate; PFNA - perfluorononanoic acid; PFOA - perfluorooctanoic acid; PFOS - perfluorooctane sulfonate; PHG - Public Health Goal; RL - reporting limit; TTHM - total trihalomethane
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX O CITY OF SANTA MARIA RESIDENTIAL
ORGANIC RECYCLING PROGRAM
BROCHURE
WHAT IS EDIBLE FOOD
RECOVERY?
Edible food recovery is the act of rescuing
leftover edible food that would have otherwise
been disposed of to feed people in need. The
City of Santa Maria (City) Edible Food Recovery
Program connects local food-generating
businesses with local food recovery organizations
to distribute leftover edible food to people in
need. A list of the local organizations operating in
the City is available on our website:
https://bit.ly/FoodRecOrgSvcs.
To learn more about how to donate leftover edible food, visit our website: https://bit.ly/EdibleFoodRecovery.
WANT TO LEARN MORE ABOUT
ORGANIC WASTE RECYCLING?
Businesses in California are required to recycle
organic waste generated onsite instead of putting it in the trash. There
are three main
ways to recycle
organic waste.
One way is to
place organic
waste in the
curbside
organics
container
provided by the
City. This method
allows for all
organic waste,
including unlined
food-soiled paper, to be collected and recycled into
compost. However, plastic bags and compostable bags
cannot be put in the organics container. In 2023, the
City recycled over 1,450,000 pounds of organic waste
through the Commercial Organics Recycling Program.
Another option is to self-haul organic waste by
backhauling or contracting with a hauler authorized
Annual Organic Waste Prevention Newsletter
CITY OF SANTA MARIA Fall 2024
According to the United
States Department of
Agriculture, 30-40% of food
produced in the United States is
wasted. Using source reduction to
prevent organic waste (food waste)
from being disposed of in the
landfill is vital. Source reduction
is the method of reducing the
generation of excess edible
food by only purchasing what is
needed, eating more parts of the
food item, and safely storing food.
How do you determine what is wasted? Conduct
a waste audit to measure the types of foods
your business wastes and why. During the audit,
monitor your waste containers and record the
types of foods that you throw out, how much is
being discarded, and the reason the food is being
disposed of. The results can better inform your
purchasing practices.
Here are other methods your business can use to
reduce food waste:
• Reduce batch sizes.
• Train staff in knife skills to make more efficient
cuts and prevent waste.
• Freeze surplus fruits and vegetables near the
end of peak freshness for later use.
• Marinate meats to extend their shelf life.
• Use see-through storage containers to allow
staff to see what is available and keep an eye
on freshness.
• Provide samples to allow customers to taste
before they buy.
• Clarify “best by” and “sell by” date labeling to
reduce customer confusion.
• Take accurate inventories before ordering more
food and base orders on what you currently
have in stock.
• Incorporate leftovers in future meals.
to haul organic waste. The City requires all self-haulers to separate organic waste from other recyclables and trash prior to hauling it to a facility that can properly recycle organic waste, as per
Santa Maria Municipal Code 8-21.
Below is a list of haulers that are authorized to
haul organic waste:
• Atlas Performance Industries, Inc.
• B&B Construction Cleanup
• Bedford Enterprises
• Coastal Rolloff Services
• Engel & Gray Inc.
• Health Sanitation Service
• MarBorg Industries
• R&R Roll-off Service
Another way to recycle organic waste is by
composting or recycling it on-site. If you are
interested in recycling organic waste on-site, there
are several different methods. Visit the City’s
Commercial Organics Recycling page for more
information: https://bit.ly/CommOrganicsRecycling.
No matter how you recycle your organic waste,
you must separate all organic waste from other
recyclables and trash. For more information on
separation and disposal techniques, watch this video:
https://bit.ly/CSMCommOrganicsSepDispVideo.
HOW IS MY ORGANIC WASTE
RECYCLED?
After the City collects organic waste from your
organics container, it is taken to the local composting facility to be turned into compost. Compost is a
nutrient rich soil amendment used to increase the
health of soil and plants.
When organic waste is disposed of in the trash it
decomposes in the landfill, producing methane, a
harmful greenhouse gas. Methane emissions negatively
affect air quality, and also contribute to the overall
warming of the climate, causing more fires, more
extreme droughts, and rising sea levels. To learn more, visit this website: https://calrecycle.ca.gov/organics/ slcp/. Diverting organic waste from the landfill also
saves valuable landfill space, prolonging the life of the landfill.
Organic Waste
Prevention
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX P CITY OF SANTA MARIA 2018 ANNUAL EPA
SLUDGE REPORT
EPA Sludge Report for 2018
City of Santa Maria
ANNUAL EPA SEWAGE SLUDGE REPORT
2018
***** GENERAL INFORMATION *****
1. Name of Generator: City of Santa Maria Wastewater Treatment Plant
2. Location: 601 Black Rd., Santa Maria, CA 93458
3. Contact Person: Todd Suter
4. Telephone: 805-925-0951 ext. 7417 (FAX) 805-928-2600 Email: [email protected]
5. Sewage Flow (Average MGD in 2018): 7.40
6. Sludge collection and treatment process:
Sludge and scum are collected in typical wastewater treatment plant primary, intermediate, and secondary clarifiers. They are pumped continuously to two sludge thickening units similar to clarifiers but much smaller in diameter. The thickened sludge is pumped on the hour for about 10 min from each thickener into two or three anaerobic digesters depending on current operations. Methane gas produced by the digesters is used as a fuel to keep the digester contents at 35-37 degrees centigrade. Gas mixing also aids the digestion process. In addition to supernatant, at regular intervals sludge is withdrawn from the digesters to earthen and asphalt drying beds where it is de-watered to a moisture content of 15% to 30%. During the process described the volatile reduction of the sludge is approximately 50%.
YEAR 2018 SLUDGE SPECIFICS
Raw sludge pumped from the thickener to the digesters averaged 4.30% solids which were 84.1% volatile. In 2018, digester #2 was out of service for the entire year. Digester #4 was in service at the start of 2018 and was taken out of service in April when Digester #3 was brought online. Digester #1 contents averaged 2.1% solids, 68.9% volatile solids, with 58% volatile solids removed. It averaged 35.4 degrees centigrade with a minimum temperature of 30.3 degrees centigrade and a maximum of 37.9 degrees centigrade with an average sludge residency time of 21 days with a minimum of 17 days and a maximum of 25 days. Digester #3 contents averaged 2.4% solids, 63.9% volatile solids, with 55.9% volatile solids removed. It averaged 34.6 degrees centigrade with a minimum temperature of 32.0 degrees centigrade and a maximum of 37.5 degrees centigrade with an average sludge residency time of 18 days with a minimum of 16 days and a maximum of 24 days. Digester #4 contents averaged 2.0% solids, 70.2% volatile solids, with 58.7% volatile solids removed. It averaged 35.0 degrees centigrade with a minimum temperature of 33.7 degrees centigrade and a maximum of 35.0 degrees centigrade with a sludge residency time of 28 days with a minimum of 24 days and a maximum of 36 days. All sludge data is an average of weekly analyses. ***** SLUDGE DISPOSAL, ANALYSIS, CLASSIFICATION, & CERTIFICATION ****
1. In 2018 digested sludge was removed from the City of Santa Maria Wastewater Treatment Plant (“SMWWTP”) site. The City of Santa Maria Regional Landfill received 2014.15 “as-is” tons for use as final cover. This equates to approximately 1409.91 dry tons or 1279.04 dry metric tonnes. A commercial composting company (Engel & Gray, Inc., 745 W. Betteravia Rd., Santa Maria, CA 93455) on site at the SMWWTP received 2142.13 “as-is” tons of digested sludge. This equates to approximately 1499.49 dry tons or 1360.32 dry metric tonnes.
EPA Sludge Report for 2018
2. At the close of 2018, there was no digested sludge stockpiled on site at the wastewater treatment plant at 601 Black Rd.
3. Pollutant Analysis: Treatment plant sludge was tested for ten metal pollutants on a quarterly basis during 2018 per the requirements of Waste Discharge Requirement (“WDR”) R3-2010-0001.
4. Results are from composited samples of individual sludge beds.
ANALYSIS OF POLLUTANTS
(Results are in mg/kg on a dry weight basis.)
City of Santa Maria Wastewater Treatment Plant Biosolids Removal Annual Monitoring Summary 2018 MASS SAMPLE Engel and Gray Composing Santa Maria Regional Landfill (tons) TYPE (wet tons*) (dry tons) (dry tonnes) (wet tons*) (dry tons) (dry tonnes) Jan 1702.22 Quanity Removed Measured Tons 728.99 510.29 462.93 0.00 0.00 0.00 Feb 315.65 Quanity Removed Measured Tons 135.18 94.63 85.84 0.00 0.00 0.00 Mar 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Apr 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 May 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Jun 2322.48 Quanity Removed Measured Tons 757.43 530.20 480.99 553.86 387.70 351.72 Jul 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Aug 2210.69 Quanity Removed Measured Tons 382.71 267.90 243.03 1317.05 921.94 836.37 Sep 465.05 Quanity Removed Measured Tons 137.82 96.47 87.52 143.24 100.27 90.96 Oct 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Nov 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Dec 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL Tons: 7016.09 Itomized Tons: 2142.13 1499.49 1360.32 2014.15 1409.91 1279.04 * Wet tons is estimated to posses a 30% moisture content by weight
MONTH PARAMETER UNITS
WWTP Biosolid Analytical Analysis : 2018
Pollutant Unit Sample Type JAN APR JUL OCT
Arsenic (mg/kg) Grab <4.9 4.8 4.7 6.4
Cadmium (mg/kg) Grab 3.3 2.1 1.4 <0.35
Chromium (mg/kg) Grab 55 48 33 39
Copper (mg/kg) Grab 560 360 430 450
Lead (mg/kg) Grab 21 14 15 16
Mercury (mg/kg) Grab 0.96 1.3 1.6 1.1
Molybdenum (mg/kg) Grab 21 16 17 23
Nickel (mg/kg) Grab 35 29 22 27
Selenium (mg/kg) Grab <4.9 <1.6 7.8 11
Zinc (mg/kg) Grab 1,800 1,200 1,400 1,500
* Pathogens: As per 503.32 (b)(3) Class B – Alternative 2, Processes to Significantly Reduce Pathogens, appendix B, number 3, anaerobic digestion with "mean cell residence and temperature between 15 days at 35 to 55 degrees Celsius and 60 days at 20 degrees Celsius". * Vector Attraction Reduction: As per 503.33 (b)(1), i.e. greater than 38% volatile reduction * This table summarizes all sludge data mandated by State and Federal authorities.
Values reported in mg/kg are on a dry weight basis.
EPA Sludge Report for 2018
5. Certification Statement: I certify, under penalty of law, that the pathogen requirements in 503.32 (b)(3) and the vector attraction reduction requirements in 503.33 (b)(1) have been met. This determination has been made under my direction and supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen requirements and vector reduction requirements have been met. I am aware that there are significant penalties for false certification including the possibility of fine and imprisonment.
______________________________
SHAD S. SPRINGER, P.E., MPA
Director of Utilities
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX Q STATEWIDE GENERAL COMPOSTING
PERMIT (ORDER WQ201-0121-DWQ)
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS
FOR COMPOSTING OPERATIONS
AUGUST 4, 2015
THIS PAGE INTENTIONALLY LEFT BLANK
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS
FOR COMPOSTING OPERATIONS
Table of Contents
ACRONYMS AND ABBREVIATIONS .........................................................................................ii BACKGROUND INFORMATION................................................................................................ 1 SCOPE OF THIS GENERAL ORDER........................................................................................ 5 APPLICATION PROCESS......................................................................................................... 8 ANTIDEGRADATION ANALYSIS .............................................................................................. 9 TITLE 27 APPLICABILITY ........................................................................................................11 CALIFORNIA ENVIRONMENTAL QUALITY ACT.....................................................................12 OTHER REGULATORY CONSIDERATIONS ...........................................................................15 IT IS HEREBY ORDERED........................................................................................................16 PROHIBITIONS.....................................................................................................................16 SPECIFICATIONS.................................................................................................................18 DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – ALL TIERS.................19 DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – TIER II ONLY.............20 MONITORING REQUIREMENTS..........................................................................................21 MAINTENANCE REQUIREMENTS.......................................................................................22 SITE CLOSURE REQUIREMENTS.......................................................................................22 REPORT REQUIREMENTS..................................................................................................22 NOTIFICATION REQUIREMENTS........................................................................................24 ADDITIONAL REQUIREMENTS ...........................................................................................25 CERTIFICATION ......................................................................................................................28 ATTACHMENT A - DEFINITIONS...........................................................................................A-1 ATTACHMENT B – MONITORING AND REPORTING PROGRAM........................................B-1 ATTACHMENT C – NOTICE OF INTENT ...............................................................................C-1 ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS...............................................D-1 i
August 4, 2015
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS
FOR COMPOSTING OPERATIONS
ACRONYMS AND ABBREVIATIONS
Antidegradation Policy State Water Board Resolution 68-16, Statement of Policy with Respect to Maintaining High Quality of Waters of California Basin Plan Water Quality Control Plan
BMP Best Management Practices
BPTC Best Practicable Treatment or Control
CalOES California Governor’s Office of Emergency Services CalRecycle California Department of Resources Recycling and Recovery CEQA California Environmental Quality Act
cm/s Centimeters per second
CPLX Complexity of the Discharge Rating
cy Cubic Yards
EDF Electronic Deliverable Format
EIR Environmental Impact Report
EQ Exceptional Quality
FEMA Federal Emergency Management Agency
FDS Fixed Dissolved Solids
Industrial General Permit Waste Discharge Requirements for Discharge of Storm Water Associated with Industrial Activities Excluding Construction Activities
LEA Local Enforcement Agency
MDL Method Detection Limit
mg/L Milligrams per Liter
mg/kg Milligrams per kilogram
µmhos/cm Micromhos per centimeter
MPI Minutes per Inch
MRP Monitoring and Reporting Program
NOA Notice of Applicability
NOI Notice of Intent to Comply with the Terms of General Waste Discharge Requirements for Composting Operations
NPDES National Pollutant Discharge Elimination System
ii
August 4, 2015
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS
FOR COMPOSTING OPERATIONS
PDF Portable Document Format
POTW Publicly Owned Treatment Works
PQL Practical Quantitation Limit
QA/QC Quality Assurance/Quality Control
Regional Water Board Regional Water Quality Control Board State Water Board State Water Resources Control Board
TDS Total Dissolved Solids
TTWQ Threat to Water Quality Rating
U.S. EPA United States Environmental Protection Agency
WDRs Waste Discharge Requirements
iii
August 4, 2015
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
BACKGROUND INFORMATION
FINDINGS:
The State Water Resources Control Board (State Water Board) finds that:
1. The State of California currently disposes an estimated 35 million tons of waste annually in landfills, of which 32 percent is compostable organic material, 29 percent is construction debris, and 17 percent is paper.
2. Composting is the biological decomposition of organic materials by microorganisms under controlled aerobic conditions to create a product (e.g., soil amendment or soil blend).
Compostable materials comprise a wide range of material types: grass, leaves, branches, prunings, stumps, wood waste, agricultural materials, manure, food, and biosolids.
3. Composting organic material yields environmental benefits by recycling nutrients and diverting materials from landfills. Diversion of compostable materials from landfills reduces the amount of material landfilled and extends landfill capacity and service life.
4. Compost can be a valuable soil amendment that improves soil tilth and plant health, increases soil water holding capacity, reduces runoff, adds beneficial micro-organisms, adds organic matter, and sequesters carbon.
5. Composting activities typically occur on open and uncovered land, exposed to precipitation. However, some composting activities are performed within structures, protected from precipitation.
6. Compostable materials may contain nutrients, metals, salts, pathogens, and oxygen-reducing compounds that can degrade water quality if allowed to migrate into groundwater or surface water. The process of composting can allow contaminants to migrate with leachate or wastewater from these materials. Additionally, composting nutrient-rich feedstocks on more permeable soil has the potential to create elevated nitrate concentrations in groundwater.
7. Composting facilities may contain areas where composting operations occur as well as ancillary buildings (e.g., office space, equipment storage, etc.). For the purposes of these General Waste Discharge Requirements for Composting Operations (General Order), the term “Composting Operation” shall mean the area at which operations are conducted, including the receiving area, pre-processing, processing, curing, storage areas, detention ponds, and other areas associated with production of compost, including storage areas for feedstocks, additives, or amendments. Attachment A, attached hereto and made part of this order, provides definitions of terms and phrases used in this General Order.
8. For the purposes of this General Order, all references to compost include compost piles actively being composted, cured, and stored on site to mature prior to sale or use (final product).
9. Water Code section 13260, subdivision (a) requires that any person discharging waste or proposing to discharge waste, other than to a community sewer system, that could affect August 4, 2015
1 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS the quality of the waters of the state, shall file a report of waste discharge. Water Code section 13263 provides that a Regional Water Quality Control Board (Regional Water Board) or the State Water Board shall prescribe waste discharge requirements (WDRs) that implement the Regional Water Boards’ water quality control plans (Basin Plans) and take into consideration the beneficial uses to be protected and the water quality objectives reasonably required for that purpose and the need to prevent nuisance. “Waste” is defined in Water Code section 13050, subdivision (d).
10. Assembly Bill No. 341 enacted in 2011 (2011–2012 Reg. Sess.; Stats. 2011, ch. 476) established a policy goal that not less than 75 percent of the solid waste generated in the state be source-reduced, recycled, or composted by 2020. The California Department of Resources Recycling and Recovery (CalRecycle) developed a plan to increase the diversion of compostable materials.
11. CalRecycle has adopted regulations governing compostable material handling facilities. (Cal. Code Regs., tit. 14, div. 7, ch. 3.1.) The regulations address composting operations including facility siting, design standards, operating standards, environmental health standards, such as sampling and pathogen reduction requirements for the compost products derived from compostable materials prior to being sold or given away, recordkeeping, monitoring, reporting, and site restoration. CalRecycle’s authority does not include regulating water quality. The State Water Board and each Regional Water Board have primary responsibility for coordination and control of water quality (Wat. Code, § 13001).
12. Historic regulation of composting operations by the Regional Water Boards has included individual WDRs or conditional waivers of WDRs. This General Order provides a streamlined method to allow the Regional Water Boards to permit composting operations and address potential impacts to water quality.
13. Dischargers covered by individual WDRs or a conditional waiver of WDRs may continue discharging under that authority until those orders expire or come up for renewal. At that time, or earlier at the discretion of the Regional Water Boards, it is the intent of the State Water Board that Regional Water Boards will enroll all eligible composting operations under this General Order. If a Regional Water Board determines that, due to site-specific conditions, coverage under this General Order will not be protective of water quality, the Regional Water Board may issue individual WDRs for a composting operation. If a composting operation is co-located at a landfill or other facility that has individual or general WDRs, the composting operation does not need to be covered under this General Order if the landfill or other facility’s WDRs include requirements for the composting operation as determined by the Regional Water Board.
14. Water Code section 13263, subdivision (i) states that the State Water Board or a Regional Water Board may prescribe general WDRs for a category of discharges if the State Water Board or Regional Water Board finds or determines that all of the following criteria apply to the discharges in that category:
a. The discharges are produced by the same or similar operations; b. The discharges involve the same or similar types of waste; August 4, 2015
2 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. The discharges require the same or similar treatment standards; and d. The discharges are more appropriately regulated under general WDRs than individual WDRs.
Composting operations that will be regulated under this General Order are consistent with the criteria listed above, and therefore a general order is appropriate. All discharges regulated under this order will be from similar operations and will be consistent with the description of composting operations as defined in this General Order. The discharges will use similar containment methods (e.g. pads and ponds). Individual WDRs are not necessary because the discharges are similar and discharge requirements would be similar if individual WDRs were issued.
15. This General Order does not preempt or supersede the authority of federal, state, or local governmental agencies to prohibit, restrict, or control discharges of waste subject to their jurisdiction.
16. A composting operation typically consists of a receiving and storage area for feedstocks, additives and amendments; a pre-processing area where materials are prepared for composting (screening, size adjustment, etc.); an active composting area; a curing area where the material matures before sale (moisture content and temperature is reduced); and a final screening and storage area where the final compost product is prepared for sale. Additives and amendments are often added to compost to adjust moisture content, product bulk, or pH.
17. Composting can be done on a small or large scale. This General Order only addresses composting operations that receive, process, and store at least 500 cubic yards (cy) of materials at any given time.
18. Composting typically results in release of water from the feedstock material as biological decomposition occurs. The released water becomes leachate and if sufficient in volume will drain from the compost pile. Precipitation that falls on, or water that is applied to the compost piles may also result in liquid draining from the compost piles. The liquids may contain nutrients, metals, salts, pathogens, and/or oxygen reducing compounds.
19. Water is evaporated from the compost piles, in part due to the heat generated in biological decomposition. Water is added to maintain appropriate moisture content. The water may include wastewater collected in the detention pond, or water from another water supply source.
20. Composting operations have the potential to degrade water quality with nutrients (e.g., nitrate), salinity (e.g., sodium chloride), pathogens, oxygen-reducing materials, sediment, and other waste constituents. Implementation of best practicable treatment or control (BPTC) can prevent or limit the degradation.
21. Composting operation setbacks from water supply wells and surface water bodies are provided in this General Order. Setbacks are included as a means of reducing pathogenic risks by coupling pathogen inactivation rates with groundwater travel time to a well or other potential exposure route (e.g. water contact activities). In general, a substantial unsaturated zone reduces pathogen survival compared to saturated soil conditions. Fine August 4, 2015
3 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS grained (silt or clay) soil particles reduce the rate of groundwater transport and therefore are generally less likely to transport pathogens; coarse grained soil particles or fracture flow groundwater conditions may be more likely to transport pathogens. Setbacks also provide attenuation of other wastewater constituents through physical, chemical, and biological processes.
22. Strategies to control infiltration of wastewater into groundwater include reducing the permeability of areas where compostable materials are stored or composted, constructing sloped pads to facilitate drainage to a detention pond or tank, and reducing the permeability of detention ponds.
23. Wastewater refers to leachate or any other liquid flowing from, or on the working surface.
That wastewater from the working surface may be conveyed to a detention pond.
Wastewater may be reapplied to the compost piles as needed.
24. Total dissolved solids (TDS) consists of both volatile (organic) and fixed (inorganic) fractions. Varying concentrations of volatile dissolved solids will exist in wastewater that is collected in the detention pond. Volatile dissolved solids in the wastewater reapplied to compost piles may be reduced to negligible concentrations by filtration and biological degradation. However, fixed dissolved solids (FDS) do not degrade biologically.
25. The 40 Code of Federal Regulations part 503 biosolids regulations establish ceiling concentration limits for metals; pollutant concentration limits; Class A pathogen requirements; Class B pathogen requirements; site restrictions; and vector attraction reduction requirements.
26. This General Order requires biosolids that are used as a feedstock at the composting facility to comply, at a minimum, with the ceiling concentrations listed in Table 1 of 40 Code of Federal Regulations part 503.13 listed in Table 1 below, and Class B pathogen requirements. The United States Environmental Protection Agency (U.S. EPA) regularly reviews, and may revise, the limitations and requirements of 40 Code of Federal Regulations, part 503. Consult 40 Code of Federal Regulations part 503 for updates.
Table 1. Biosolids Feedstock Ceiling Concentrations
Constituent Units Ceiling Concentration
Arsenic mg/kg 75
Cadmium mg/kg 85
Copper mg/kg 4,300
Lead mg/kg 840
Mercury mg/kg 57
Molybdenum mg/kg 75
Nickel mg/kg 420
Selenium mg/kg 100
Zinc mg/kg 7,500
August 4, 2015
4 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
SCOPE OF THIS GENERAL ORDER
27. The amount and type of feedstocks composted, as well as site conditions such as depth to groundwater, percolation rate, and proximity to surface water and wells inherently affects the threat to water quality. This General Order employs a tiered approach to regulating composting operations.
28. Only composting operations that comply with the allowable feedstock and setback requirements are eligible for coverage under this General Order. a. Tier I and Tier II allowable feedstocks (as defined in Attachment A) are limited to the materials listed in Table 2 below:
Table 2. Allowable Feedstocks
Tier I Feedstocks Tier II Feedstocks
Agricultural materials Food materials (non-vegetative)
Green materials Biosolids (Class A, B, and/or Exceptional Quality (EQ)): as defined in Attachment A
Paper materials Manure
Vegetative food materials Anaerobic digestate derived from allowable Tier II feedstocks
Anaerobic digestate derived from allowable
Tier I feedstocks
A combination of allowable Tier I and Tier
II feedstocks
Residentially co-collected or self-hauled
food and green materials
b. Composting operations shall be setback at least 100 feet from the nearest surface water body and/or the nearest water supply well. A lesser setback distance may be allowed by the Regional Water Board if the Discharger can demonstrate that the groundwater, geologic, topographic, and well construction conditions at the site are adequate to protect water quality.
29. Composting operations (Tier I or Tier II) are classified based on the types of feedstocks; total volume of materials received, processed, and stored at any given time; and hydrogeologic siting considerations. The tiers are defined as follows:
a. Tier I includes a composting operation that meets all of the following conditions:
1) The feedstocks are limited to Tier I feedstocks listed in Table 2 and defined in Attachment A;
2) The facility receives, processes, and stores less than 25,000 cy of a combination of allowable Tier I feedstocks, compost, (active, curing, and final product) additives and amendments on site at any given time; and 3) The percolation rate and depth to the highest anticipated groundwater level underlying the composting operation is consistent with Table 3 below:
August 4, 2015
5 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Table 3. Tier I Percolation Rate and Depth to Groundwater Standards Soil Percolation Rate
(MPI – minutes per inch)
Depth to Groundwater
(minimum)
< 1 MPI 50 feet
1 MPI – 5 MPI 20 feet
> 5 MPI – 30 MPI 8 feet
> 30 MPI 5 feet
b. Tier II includes a composting operation that meets one or more of the following conditions:
1) The feedstocks include any of the Tier II feedstocks listed in Table 2, and defined in Attachment A;
2) The facility receives, processes and stores 25,000 cy or more of a combination of allowable Tier I or Tier II feedstocks, compost, additives and amendments on site at any given time; and/or
3) The site-specific hydrogeologic conditions do not meet the Tier I percolation rate and depth to groundwater standards listed in Table 3.
30. The following composting-related activities are unlikely to degrade water quality and are therefore exempt from this General Order. However, the Regional Water Board may determine individual WDRs are appropriate under site-specific conditions. Composting operations may be subject to other federal, state, or local regulations. a. Agricultural composting;
b. Chipping and grinding facilities and operations. This includes chipping and grinding facilities and operations at a composting facility if located outside of the composting operation area;
c. Lot clearing by local government agencies (e.g., grubbing, tree trimming, etc.) for fire protection;
d. Composting activities that are within a fully enclosed vessel; e. Composting operations that receive, process, and store less than 500 cy of allowable materials at any given time; and
f. Composting operations that receive, process and store less than 5,000 cy per year of allowable Tier I and Tier II feedstocks, additives and amendments that implement the following management practices:
1) Completely cover materials during storm events as needed to reduce the generation of wastewater; and
2) Manage the application of water to reduce the generation of wastewater.
August 4, 2015
6 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
31. Discharges of the following wastes may pose a significant threat to water quality, and are therefore prohibited from being discharged under this General Order. The discharge of these wastes may be more appropriately regulated by individual WDRs or other orders issued by the Regional Water Board.
a. Animal carcasses;
b. Liquid wastes other than those of food origin;
c. Medical wastes as defined in Health and Safety Code section 117690; d. Radioactive wastes;
e. Septage;
f. Sludge, including but not limited to sewage sludge, water treatment sludge, and industrial sludge;
g. Wastes classified as “designated”, as defined in Water Code section 13173; h. Wastes classified as “hazardous” as defined in California Code of Regulations, title 22, section 66261.3;
i. Wood containing lead-based paint or wood preservatives, or ash from such wood; or j. Any feedstock, additive, or amendment other than those specifically described in this General Order, unless approved by the Regional Water Board as described in the Specifications.
32. The use of additives and amendments, as defined and limited by this General Order, is not expected to pose a significant threat to water quality as long as the Discharger maintains compliance with the requirements and prohibitions of this General Order. A Regional Water Board may limit or prohibit the use of an additive or amendment if the use of the additive or amendment could result in pollution or nuisance.
33. Compliance with design specifications and associated performance requirements included in this General Order is determined to be protective of water quality.
34. The requirements in this General Order do not apply to the application or use of the final compost product.
35. Technical and monitoring reports specified in this General Order are required. Failing to furnish the reports by the due date or falsifying information in the reports, are misdemeanors that may result in assessment of civil liabilities against the Discharger.
Water Code section 13267 states, in part:
“In conducting an investigation specified in subdivision (a), the regional board may require that any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region, or any citizen or domiciliary, or political agency or entity of this state who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of waters August 4, 2015
7 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS within its region shall furnish, under penalty of perjury, technical or monitoring program reports which the regional board requires. The burden, including costs, of these reports shall bear a reasonable relationship to the need for the report and the benefits to be obtained from the reports. In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports, and shall identify the evidence that supports requiring that person to provide the reports.” The technical reports required by this General Order and the Monitoring and Reporting Program (MRP) in Attachment B are necessary to assure compliance with this General Order.
36. In accordance with Water Code section 13000 et seq., this General Order implements regulations and policies adopted by the State Water Board, including the agency’s regulations under California Code of Regulations, title 23, and implements applicable provisions of the Health and Safety Code.
APPLICATION PROCESS
37. Existing composting operations, except those with individual WDRs, general WDRs, or conditional waivers of WDRs that address the composting operation as determined by the Regional Water Board, are required to seek coverage under this General Order by submitting a complete Notice of Intent (NOI) (Attachment C), including the appropriate filing fee (Cal. Code Regs., tit. 23, § 2200), and a technical report including, but not limited to, information requested in Attachment D to the Regional Water Board. The NOI, filing fee and technical report must be submitted within one year of adoption of the General Order. The technical report shall include a proposed schedule for full compliance and must be as short as practicable but may not exceed 6 years from the date of the NOI.
38. New composting operations that propose to begin operating after adoption of this General Order, are required to seek coverage by submitting a complete NOI (Attachment C), including the appropriate filing fee (Cal. Code Regs., tit. 23, § 2200) and a technical report including, but not limited to, information requested in Attachment D, to the Regional Water Board not less than 90 days prior to commencement of the composting operation.
39. For the purposes of this General Order, an NOI and accompanying technical report (as described in Attachments C and D, respectively) is equivalent to a Report of Waste Discharge. After the Regional Water Board determines that the NOI and accompanying technical report are complete, the initial fee has been received, and the composting operation can be appropriately regulated under this General Order, a Notice of Applicability (NOA) will be issued by the Regional Water Board. Within the NOA, the Regional Water Board will at a minimum, confirm a Discharger's tier, timeline for compliance, and method of monitoring to comply with applicable monitoring requirements.
40. Upon issuance of an NOA for coverage under this General Order, the Discharger’s NOI and technical report will become incorporated by reference into this General Order. The August 4, 2015
8 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Discharger is responsible for implementing all operations in a manner that complies with this General Order.
41. The Discharger is required to pay an annual fee (e.g., waste discharge permit fee) (Wat.
Code, § 13260 et seq.). The filing fee accompanying the NOI is the first year's annual fee.
The annual fee is based on the threat to water quality (TTWQ) and complexity (CPLX) rating of the discharge (Cal. Code Regs., tit. 23, § 2200.). The ratings are available at:
http://www.waterboards.ca.gov/resources/fees/.
ANTIDEGRADATION ANALYSIS
42. State Water Board Resolution No. 68-16, Statement of Policy with Respect to Maintaining High Quality of Waters of California (hereafter the Antidegradation Policy) requires that disposal of waste into the waters of the state be regulated to achieve the highest water quality consistent with maximum benefit to the people of the state. The quality of some waters of the state is higher than that established by adopted policies, and that higher quality water shall be maintained to the maximum extent possible consistent with the Antidegradation Policy. The Antidegradation Policy requires the following:
a. Maintenance of existing high quality waters of the state unless limited degradation is consistent with maximum benefit to the people of the state, will not unreasonably affect present and anticipated beneficial use of the water, and will not result in water quality less than that prescribed in state policies.
b. Any activity that produces or may produce a waste and discharges or proposes to discharge to existing high quality waters will be required to meet WDRs that will result in BPTC of the discharge necessary to assure pollution or nuisance will not occur, and the highest water quality consistent with maximum benefit to the people of the state will be maintained.
43. When issuing NOAs under this General Order, the Regional Water Board must assure that Dischargers implement BPTC as necessary to maintain the highest water quality consistent with maximum benefit to the people of the state.
44. This General Order may allow limited discharges to groundwater. There are not sufficient data to determine which receiving waters are high quality waters. To the extent a discharge covered under this General Order may be to high quality waters, this General Order authorizes limited degradation consistent with the Antidegradation Policy as described in the findings below.
45. Limited degradation of groundwater by some waste constituents associated with composting operations, after effective source control, treatment, and control measures are implemented, is consistent with the maximum benefit to the people of the state. The economic prosperity of communities and associated industry, and the diversion of wastes from landfills and associated conservation of landfill space are of maximum benefit to the people of the state and provide sufficient justification for allowing limited groundwater degradation that may occur pursuant to this General Order provided the terms of the August 4, 2015
9 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS applicable Basin Plan and other applicable State Water Board and Regional Water Board policies are consistently met.
46. This General Order places restrictions on the discharge of waste from composting operations. The terms and conditions of this General Order are designed to minimize groundwater quality degradation and protect beneficial uses of waters of the state.
Implementation of water and wastewater management plans, groundwater protection plans, and construction of waste containment features at composting operations will minimize groundwater quality degradation.
47. The General Order establishes limits on the volume, types, and quality of the feedstocks, additives and amendments used at the facility. Some waste types are explicitly prohibited from use due to their threat to water quality. All feedstocks, additives and amendments must be contained in areas to control wastewater. In addition, hydrogeologic site conditions are considered when classifying a compost facility as Tier I or Tier II. a. Facilities that receive, process, and store less than 25,000 cy of allowable Tier I feedstocks, compost, additives and amendments on site at any given time are inherently less likely to degrade water quality because the amount and types of waste constituents present at the facility is lower than at Tier II facilities. The limits apply both to the feedstocks and the types and amounts of additives and amendments. Tier I facilities must also comply with the hydrogeologic site conditions (depth to groundwater and percolation rate) specified in the General Order. b. Tier II facilities impose additional BPTC measures such as limits on feedstock quality; and hydraulic conductivity requirements for working surfaces, detention ponds, and drainage ditches. Biosolids used as a feedstock must comply with the ceiling concentrations contained in Code of Federal Regulations, section 503.13 (Table 1), at a minimum. In addition, detention ponds must be constructed with a pan lysimeter to allow early detection of pond liner leakage.
48. To mitigate potential impacts to water quality, siting restrictions specified in this General Order prohibit composting operations within 100 feet of the nearest surface water body or water supply well. A lesser setback distance may be allowed by the Regional Water Board if the Discharger can demonstrate that the groundwater, geologic, topographic, and well construction conditions at the site are adequate to protect water quality. In addition, feedstocks used (Table 2), volume of materials (received, processed and stored) on site at any given time, soil percolation rate, and depth to groundwater standards (Table 3) of this General Order are used to classify composting operations into two tiers. Composting operations not meeting minimum standards for percolation rate and depth to groundwater are classified into the more protective Tier II category.
49. This General Order establishes requirements and standards for BPTC measures to limit or prevent degradation. Identified BPTC measures include:
a. Minimize Infiltration of Waste Constituents on Working Surfaces - The most effective way to reduce or eliminate water quality impacts is to restrict infiltration of wastes on working surfaces (including receiving, processing, and storage areas). The General August 4, 2015
10 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Order requires working surfaces to be designed and constructed to be sloped to prevent ponding, and convey wastewater to an approved wastewater management system. Tier II facilities must also comply with a hydraulic conductivity standard to limit infiltration of liquids to the subsurface at working surfaces, drainage ditches and detention ponds.
b. Design and Operate Detention Ponds to Contain and Reuse Wastewater - All detention ponds must comply with design, construction, and maintenance requirements in this General Order. The General Order includes requirements that ponds must be designed and certified by a registered professional engineer to have adequate capacity and structural integrity to hold wastewater and precipitation. All ponds must be managed to prevent breeding of mosquitos and generation of odors.
Detention ponds constructed at Tier II facilities must also comply with a hydraulic conductivity standard to limit infiltration of liquids to the subsurface. c. Perform Monitoring to Ensure BPTC Measures are Effective - To detect potential threats to water quality, detention ponds constructed at Tier II facilities must be constructed with a pan lysimeter monitoring device under the lowest point of the pond or equivalent engineered alternative approved by the Regional Water Board.
The engineered alternative must provide equivalent assurance of the earliest possible detection of a release from the pond.
50. The State Water Board recognizes that composting operations play an important role in meeting California's recycling goals to divert more wastes from landfills into reusable products. In addition, composting is a strategy for reducing greenhouse gas emissions throughout the state. Benefits of using compost include increasing soil water holding capacity, adding beneficial micro-organisms to improve soil health, improving soil tilth, and carbon sequestration. Considering these benefits, the State Water Board finds that composting in compliance with this General Order is consistent with the maximum benefit to the people of the state.
TITLE 27 APPLICABILITY
51. California Code of Regulations, title 27, sections 20200 through 20230 establish a waste classification system. Wastes covered under California Code of Regulations, title 27 are classified as either inert, nonhazardous solid, or designated. Inert wastes pose minimal risk to water quality, nonhazardous solid wastes present a greater risk than inert wastes, and designated wastes pose the greatest risk to water quality. Allowable compostable materials per this General Order meet the definition of nonhazardous solid waste under California Code of Regulations, title 27, section 20220, subdivision (a).
52. California Code of Regulations, title 27, section 20200, subdivision (a)(1) allows a finding to be made that, "…a particular waste constituent or combination of constituents presents a lower risk of water quality degradation than indicated by classification according to this article." Therefore, to the extent that a particular compostable material could be characterized as designated waste, such material shall be regulated as a nonhazardous August 4, 2015
11 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS solid waste pursuant to California Code of Regulations, title 27, section 20200, subdivision (a)(1) because the compostable material presents a lower risk to water quality than typical designated wastes when managed as required by this General Order.
53. The California Code of Regulations, title 27 regulations that apply to nonhazardous solid waste only apply to such waste that is disposed of in a landfill. Diverting compostable organic materials from landfills is one of the goals of this General Order. Therefore, compost operations eligible for coverage under this General Order, California Code of Regulations, title 27 regulations shall not apply so long as the Discharger continues to meet the requirements of this General Order.
CALIFORNIA ENVIRONMENTAL QUALITY ACT
54. On August 7, 2015, in accordance with the California Environmental Quality Act (CEQA) (Pub. Resources Code, § 21000 et seq.), the State Water Board certified Environmental Impact Report (EIR) No. 2015012021 for this General Order. Several significant impacts related to water quality were identified in the EIR. The General Order contains mitigation measures designed to reduce the impact when possible. A summary of the water quality related significant impacts and the mitigation measures is presented below:
EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 6.5 Composting operations
have the potential to
create objectionable
odors affecting a
substantial number of
people.
The General Order requires control of objectionable
odors. Mitigation measures are contained in the
Specifications and Design Construction and
Operation Requirements – all tiers.
Impact 9.2 Composting operations
have the potential to
result in substantial soil
erosion or loss of topsoil.
The General Order requires control of wastewater
generated by the compost process. Mitigation
measures are contained in the Design Construction
and Operation Requirements – all tiers.
August 4, 2015
12 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 11.1 Composting operations
have the potential to
result in violations of
water quality standards
or waste discharge
requirements.
The General Order requires surface and
groundwater quality to be maintained to protect
beneficial uses. The following mitigation measures
related to water quality standards are included in the
General Order:
For mitigation related to surface water
objectives, see mitigation measures in response
to Impact 9.2 (listed above).
For mitigation related to groundwater objectives
mitigation measures are contained in
Prohibitions, Specifications, Design Construction
and Operation Requirements – all tiers, and tier
II, and maintenance requirements. The General
Order limits the types of feedstocks used, and
requires certain containment requirements to
minimize infiltration.
Impact 11.3 Composting operations
have the potential to
substantially alter
existing drainage
resulting in substantial
erosion or siltation on- or
off-site.
Composting operations will be designed to contain
wastewater on-site. See the mitigation measures
described for Impact 9.2 and 11.1.
Requirements of the General Order to contain
wastewater on-site include the following:
Design, construct, and maintain areas used for
receiving, processing, or storing feedstocks,
additives, amendments, or compost to control
and manage run-on and run-off from a 25-year,
24-hour peak storm event;
Protect areas used for receiving, processing, or
storing feedstocks, additives, amendments, or
compost from surface flows associated with a
25-year, 24-hour peak storm event from
inundation by surface flow;
Design and operate the detention pond,
containment berm, and drainage conveyance
systems to contain a 25-year,
24-hour peak storm event;
Require low permeability drainage ditches for Tier II
operations.
August 4, 2015
13 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 11.4 Composting operations
may have the potential to
substantially alter the
existing drainage pattern
of the site or area,
including through the
alteration of the course of
a stream or river, or
substantially increase the
rate or amount of surface
runoff in a manner which
would result in flooding
on- or off-site.
The General Order requires management of
drainage and wastewater run-off. See Mitigation
Measures 9.2, 11.1, and 11.3.
Impact 11.5 Composting operations
may create or contribute
runoff water which could
exceed the capacity of
existing or planned storm
water drainage systems
or provide substantial
additional sources of
polluted runoff.
Composting operations will be designed to contain
wastewater on-site. See the mitigation measures
described for Impact 9.2.
Impact 11.6 Composting operations
may have the potential to
substantially degrade
water quality.
Composting operations will be designed to contain
wastewater on-site and prevent wastewater from
changing groundwater quality to the extent beneficial
uses are impacted. See the responses to Impacts
9.2 and 11.1.
Impact 15.2 Composting operations
have the potential to
exceed wastewater
treatment requirements
of the applicable
Regional Water Board.
The General Order requires containment of
wastewater that is generated. Active treatment
systems at composting facilities are possible (most
likely a mechanical aerator in a detention pond). If
off-site disposal of wastewater is necessary, delivery
to a treatment system is possible via a collection
system or tank truck hauling. See the responses to
Impacts 9.2 and 11.1.
August 4, 2015
14 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 15.6 Composting operations
have the potential to
result in a determination
by the wastewater
treatment provider that it
does not have adequate
capacity to serve the
project’s projected
demand in addition to the
provider’s existing
commitments.
The General Order requires containment of
wastewater that is generated; therefore a discharge
at a wastewater treatment facility is unlikely. See
the responses to Impacts 9.2 and 11.1.
55. The State Water Board has notified composting operators and owners, and governmental agencies and interested persons of its intent to certify an EIR and adopt a General Order and provided them the opportunity to attend a public meeting and submit their written views and recommendations.
56. The State Water Board, in a public meeting, heard and considered all comments pertaining to this matter.
OTHER REGULATORY CONSIDERATIONS
57. All WDRs must implement the applicable Regional Water Board’s Basin Plan for the region in which the discharge occurs; therefore this General Order requires dischargers to comply with all applicable Basin Plan requirements and water quality objectives governing the discharge. In the event of a conflict between the requirements of this General Order and the Basin Plan, the more stringent requirement prevails.
58. The Discharger, as a condition of this General Order, may be required to conduct regular maintenance and monitoring to demonstrate protection of water quality and beneficial uses. Dischargers are financially responsible for costs associated with these activities as long as the operation is covered under this General Order.
59. This General Order is not a National Pollutant Discharge Elimination System (NPDES) permit issued pursuant to the Federal Clean Water Act. For composting operations where storm water discharges off-site, the Discharger may be required to enroll under the State Water Board’s General Order No. 97-03-DWQ (new Industrial General Permit 2014-0057- DWQ will be effective July 1, 2015), NPDES General Permit No. CAS000001, Waste Discharge Requirements for Discharges of Storm Water Associated with Industrial Activities Excluding Construction Activities (Industrial General Permit), and/or future promulgations. If wastewater is discharged to surface water, the Discharger may be required to obtain an individual NPDES permit. Coverage under this General Order does August 4, 2015
15 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS not exempt a facility from the federal Clean Water Act. Any facility required to obtain such permits must notify the Regional Water Board.
60. The issuance of this General Order is consistent with the goal to provide water resources protection, while considering economic and environmental impacts as stated in the Strategic Plan of the Water Boards and section 13263, subdivision (a) of the Water Code.
Economic considerations are discussed in Appendix D of the EIR.
61. This General Order does not supersede the authority of local governmental agencies to prohibit, restrict, or control the use of biosolids subject to their control, as allowed under current law. It is the responsibility of the Discharger to obtain any local governmental agency permits or authorizations prior to the composting or use of biosolids at each site.
62. This General Order does not supersede any federal, state, or local law or regulation.
63. Pursuant to Water Code section 13263, subdivision (g), the discharge of waste into waters of the state is a privilege, not a right, and adoption of this General Order does not create a vested right to discharge wastes into the waters of the state. Failure to prevent conditions that create or threaten to create pollution or nuisance or that may unreasonably degrade waters of the state will be sufficient reason to modify, revoke, or enforce this General Order.
64. Pursuant to Water Code section 13241 and 13263, the State Water Board, in establishing the requirements contained herein, considered factors including, but not limited to, the following:
a. Past, present, and probable future beneficial uses of water; b. Environmental characteristics of the hydrographic unit under consideration, including the quality of water available thereto;
c. Water quality conditions that could reasonably be achieved through the coordinated control of all factors which affect water quality in the area; d. Economic considerations;
e. The need for developing housing within the region(s); and f. The need to develop and use recycled water.
IT IS HEREBY ORDERED
IT IS HEREBY ORDERED pursuant to Water Code sections 13263 and 13267, the Discharger, its agents, successors, and assigns, in order to meet the provisions contained in division 7 of the Water Code and regulations adopted hereunder, shall comply with the following:
PROHIBITIONS
1. Any feedstock, additive, amendment, or compost (active, curing, or final product) stored, processed, or composted outside of the designated composting operation areas, as those boundaries are specified in an NOI and/or a technical report, and approved by the Regional Water Board, is prohibited.
August 4, 2015
16 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
2. Any volume of any feedstock, additive, amendment, or compost (active, curing, or final product) exceeding those specified in this General Order is prohibited.
3. Use of any feedstock, additive, amendment, or material, other than those described in this General Order is prohibited.
4. Discharge of any of the following wastes, including storage thereof, at a composting operation under this General Order is prohibited:
a. Animal carcasses;
b. Liquid wastes other than those of food origin;
c. Medical wastes as defined in the Health and Safety Code section 117690; d. Radioactive wastes;
e. Septage;
f. Sludge, including but not limited to sewage sludge, water treatment sludge, and industrial sludge;
g. Wastes classified as “designated” as defined in Water Code section 13173; h. Wastes classified as “hazardous” as defined in California Code of Regulations, title 22, section 66261.3;
i. Wood containing lead-based paint or wood preservatives, or ash from such wood; or j. Any feedstock, additive, or amendment other than those specifically described in this General Order, unless approved by the Regional Water Board.
5. Discharges of feedstocks, additives, amendments, or wastes to lands not owned, leased, or otherwise controlled by the Discharger for the purposes of composting is prohibited.
6. Discharge of wastes to surface waters is prohibited, except as authorized by an NPDES permit.
7. Discharge of wastes including overflow, wastewater, or bypass from transport, treatment, storage, or disposal systems to adjacent drainages or adjacent properties is prohibited.
8. Use of biosolids as a feedstock with concentrations of a metal that exceeds the ceiling concentration presented in 40 Code of Federal Regulations section 503.13 (Table 1), is prohibited.
9. Use of biosolids as an additive or amendment is prohibited.
10. Use of anaerobic digestate derived from sewage sludge as an additive or amendment is prohibited.
11. Evapo-concentration of constituents in any detention pond that results in hazardous constituent concentration levels, as defined in California Code of Regulations, title 22, section 66261.3 is prohibited.
August 4, 2015
17 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
SPECIFICATIONS
1. The use of additives defined in this General Order, and Attachment A, is allowed provided that the additives meet the following specifications.
a. For Tier I facilities, the following approved additives may comprise no more than 10 percent combined, on a total volume basis, of the total feedstocks for any given batch of compost:
1) Fertilizing material applied at rates that will be consumed or fixed/immobilized during active composting;
2) Manure;
3) Anaerobic digestate (solid) derived from any material other than allowable Tier I feedstocks ; and/or
4) Other material specified in an NOI and/or a technical report, and approved by the Regional Water Board.
b. For Tier II facilities, the following approved additives may comprise no more than 30 percent combined (other than liquid food material), on a total volume basis, of the total feedstocks for any given batch of compost:
1) Fertilizing material applied at rates that will be consumed or fixed/immobilized during active composting;
2) Liquid food material specified in an NOI and/or a technical report, and approved by the Regional Water Board, and applied at a rate that prevents conditions leading to pollution or nuisance, as defined in Water Code section 13050; 3) Anaerobic digestate (solid) derived from any material other than allowable Tier I and Tier II feedstocks; and/or
4) Other material specified in an NOI and/or a technical report, and approved by the Regional Water Board.
2. Additives and amendments must be handled, stored, and processed in the manner specified in the NOI and/or technical report and approved by the Regional Water Board.
3. All feedstocks, additives, amendments, and compost (active, curing, or final product) must not cause, threaten to cause, or contribute to conditions of pollution, contamination, or nuisance. These discharges must comply with the applicable Basin Plan requirements.
4. All feedstocks, additives, amendments, and compost (active, curing, or final product) must be located on containment structures designed and constructed as required by this General Order.
5. Dischargers must submit with the NOI and technical report, a Water and Wastewater Management Plan that describes how wastewater will be managed to prevent discharge.
The plan must describe the design, operations, and maintenance of the systems, including water balance calculations and assumptions, if required.
6. Wastewater shall be handled and managed in accordance with an approved Water and Wastewater Management Plan in the technical report described in Attachment D.
August 4, 2015
18 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
7. Feedstocks for composting shall be limited to the allowable Tier I and Tier II feedstocks listed in Table 2 and defined in Attachment A.
8. Composting operations shall be setback at least 100 feet from the nearest surface water body and/or the nearest water supply well. A lesser setback distance may be allowed by the Regional Water Board if the Discharger can demonstrate that the groundwater, geologic, topographic, and well construction conditions at the site are adequate to protect water quality.
9. For Tier I and Tier II facilities, the type of amendments must be specified in a NOI and/or a technical report.
DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – ALL TIERS
1. Areas used for receiving, processing, or storing feedstocks, additives, amendments, or compost (active, curing, or final product) must be designed to limit water quality degradation. Working surfaces and containment structures must be designed, constructed, operated and maintained to:
a. Facilitate drainage and minimize ponding by sloping or crowning pads to reduce infiltration of liquids;
b. Reliably transmit free liquid present during storage, treatment, and processing of materials to a containment structure to minimize the potential for waste constituents to enter groundwater or surface water; and
c. Prevent conditions that could contribute to, cause, or threaten to cause a condition of contamination, pollution, or nuisance.
2. Working surfaces must be constructed to allow year round equipment access to feedstocks, additives, amendments, and compost (active, curing, or final product) without damage to the working surfaces and containment structures.
3. To prevent potential impacts to waters of the state, the Discharger must minimize the potential for piles of feedstocks, additives, amendments, or compost (active, curing, or final product) to become over-saturated and generate wastewater.
4. Areas used for receiving, processing, or storing feedstocks, additives, amendments, or compost (active, curing, or final product) must be designed, constructed, and maintained to control and manage all run-on, runoff, and precipitation which falls onto or within the boundaries of these areas, from a 25-year, 24-hour peak storm event at a minimum.
5. Areas used for receiving, processing, or storing feedstocks, additives, amendments, or compost (active, curing, or final product) must be protected from inundation by surface flows associated with a 25-year, 24-hour peak storm event at a minimum.
6. Detention ponds, if used, must be designed, constructed, and maintained to prevent conditions contributing to, causing, or threatening to cause contamination, pollution, or nuisance, and must be capable of containing, without overflow or overtopping (taking into consideration the crest of wind-driven waves and water reused in the composting August 4, 2015
19 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS operation), all runoff from the working surfaces in addition to precipitation that falls into the detention pond from a 25-year, 24-hour peak storm event at a minimum, or equivalent alternative approved by the Regional Water Board.
7. Detention ponds, if used, shall be managed as described in the facility’s Water and Wastewater Management Plan.
8. Detention ponds, if used, must be managed to maintain a dissolved oxygen concentration in the upper zone (one foot) of at least 1.0 milligrams per liter (mg/L).
9. Detention ponds, if used, shall be managed to mitigate breeding of mosquitoes including, but not limited to the following:
a. An erosion control program shall be implemented to ensure that small coves and irregularities are not created around the perimeter of the water surface. b. Weeds shall be minimized through control of water depth, a shoreline synthetic liner, harvesting, or herbicides.
c. Dead algae, vegetation, and debris shall be removed from the water surface. d. Coordination with the local mosquito abatement or vector control district to supplement the measures described above in cases where other methods are infeasible.
10. Berms must be designed, constructed, and maintained to prevent run-on and run-off from a 25-year, 24-hour peak storm event at a minimum. Berms must be adequately protected from erosion, and must not cause, threaten to cause, or contribute to conditions resulting in contamination, pollution, or nuisance.
11. Drainage conveyance systems must be designed, constructed, and maintained for conveyance of wastewater from the working surface in addition to direct precipitation from a 25-year, 24-hour peak storm event at a minimum. Ditches must be properly sloped to minimize ponding and kept free and clear of debris to allow for continuous flow of liquid.
Ditches must be adequately protected from erosion, and must not cause, threaten to cause, or contribute to conditions resulting in contamination, pollution, or nuisance.
Ditches must be inspected and cleaned out prior to the wet season every year.
DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – TIER II ONLY
1. Working surfaces must be capable of resisting damage from the movement of equipment and weight of piles, and have a hydraulic conductivity of 1.0 x 10-5 centimeters per second (cm/s) or less. Working surfaces must consist of one of the following:
a. Compacted soils, with a minimum thickness of one foot; b. Asphaltic concrete or Portland cement concrete; or
c. An equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board.
August 4, 2015
20 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
2. Detention ponds must be designed, constructed, operated, and maintained to meet a hydraulic conductivity of 1.0 x 10-6 cm/s or less. These ponds must include one of the following:
a. A liner system consisting of a 40 thousandths of an inch (mil) synthetic geomembrane (60-mil if high-density polyethylene), underlain by either one foot of compacted clay or a geosynthetic clay liner installed over a prepared base; b. A liner system that includes Portland cement concrete – designed to minimize cracking and infiltration – underlain by a 40-mil synthetic geomembrane (60-mil if high-density polyethylene); or
c. An equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board.
3. Detention ponds must be designed and constructed with a pan lysimeter monitoring device under the lowest point of the pond, or an equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board. The engineered alternative must provide equivalent assurance of the earliest possible detection or prevention of a release from the pond.
4. Tanks, if used, must be designed, operated, maintained and monitored in accordance with applicable laws and regulations.
5. Drainage ditches must be designed, constructed, and maintained to convey all precipitation and runoff from a 25-year, 24-hour peak storm event at a minimum and have a hydraulic conductivity of 1.0 x 10-5 cm/s or less, and be lined with one of the following:
a. Compacted soils, with a minimum thickness of one foot; b. Asphaltic concrete or Portland cement concrete; or
c. An equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board.
MONITORING REQUIREMENTS
1. Dischargers subject to this General Order must implement the applicable requirements specified in Attachment B, the MRP, which are hereby incorporated by reference as part of this General Order.
2. Pursuant to Water Code section 13267, the Discharger must comply with the applicable requirements specified in the MRP (Attachment B). If a site-specific MRP becomes necessary, the Discharger must comply with requirements specified in an individual MRP issued to the Discharger by the Regional Water Board. Failure to comply with the applicable requirements specified in Attachment B or a site-specific MRP issued by the Regional Water Board may subject the Discharger to civil liability. (Wat. Code, § 13268.)
3. In lieu of meeting hydraulic conductivity specifications for Tier II working surfaces and drainage ditches, the Discharger may implement a groundwater protection monitoring program. The Discharger shall confirm this intention by submitting a complete August 4, 2015
21 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Groundwater Protection Monitoring Plan in the technical report with the NOI, as described in Attachment D.
4. Within 90 days of issuance of an NOA, the Discharger shall implement the approved Groundwater Protection Monitoring Plan, if applicable.
MAINTENANCE REQUIREMENTS
1. The Discharger shall maintain containment structures (e.g. berms, pads, detention ponds, tanks, run-on/run-off control structures, etc.) and monitoring systems (e.g. groundwater monitoring devices) in good working order.
2. The Discharger must regularly inspect and maintain all containment structures and monitoring systems pursuant to this General Order, MRP, and NOA. The frequency of inspections must be sufficient to prevent feedstocks, additives, amendments, compost (active, curing, or final product), or wastewater from creating, threatening to create, or contributing to conditions of contamination, pollution, or nuisance.
SITE CLOSURE REQUIREMENTS
1. Release of wastes or waste-derived constituents at an unmanaged, inactive, or abandoned composting operation may cause, threaten to cause, or contribute to degradation of the waters of the state. At least 90 days prior to ceasing composting operations, the discharger shall submit a Site Closure Plan to the Regional Water Board for approval.
2. The Discharger must jointly notify the appropriate Regional Water Board and Local Enforcement Agency in writing at the conclusion of the site closure activities that describes closure in accordance with the Site Closure Plan and Regional Water Board requirements.
REPORT REQUIREMENTS
1. General Reporting Requirements – The Discharger must furnish the following information within a timeframe specified by the Regional Water Board:
a. Any information which the Regional Water Board may request to determine compliance with this General Order; and
b. Copies of records required to be kept by this General Order.
2. NOI and Technical Report – The Discharger must submit an NOI and technical report as specified in Attachments C and D of this General Order. The Discharger must submit general information, site conditions, design, operations and monitoring information and a compliance schedule for existing facilities. The Discharger must submit a technical report with design information at least 90 days prior to any new construction of any working surfaces, detention ponds, berms, ditches, or any other water quality protection containment structure for approval by the appropriate Regional Water Board. The design information must include water balance calculations for detention ponds, design of August 4, 2015
22 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS wastewater conveyance features, liner materials and thicknesses, and rationale for liner system design. The technical report must ensure testing and quality assurance of liner materials and compacted soils in accordance with commonly accepted engineering practices, American Society for Testing and Materials test methods, and/or other appropriate material standards.
3. Final Post-Construction Report – The Discharger must submit a post-construction report to the Regional Water Board within 60 days of completing all construction activities associated with all applicable containment and monitoring structures, as required for compliance with this General Order and the MRP. The post-construction report must contain as-built plans and specifications to document that containment and monitoring structures were properly constructed and tested.
4. Annual Monitoring and Maintenance Report - The Discharger must submit an Annual Monitoring and Maintenance Report to the appropriate Regional Water Board no later than April 1st of each year (or next subsequent business day, if falling on a weekend or state-observed holiday), as described in the MRP. The Annual Monitoring and Maintenance Report must summarize all monitoring and maintenance activities performed and adverse conditions noted since the prior reporting period with respect to all berms, ditches, working surfaces, detention ponds, and monitoring systems. As part of the Annual Monitoring and Maintenance Report, the Discharger must certify that the composting operation complies with the requirements of this General Order and applicable portions of the MRP.
5. Reporting Declaration - All applications, reports, or information submitted to the Regional Water Boards must be signed and certified as follows:
a. The NOI must be signed as follows:
1) For a corporation - by a principal executive officer of at least the level of vice president;
2) For a partnership or sole proprietorship - by a general partner or the proprietor, respectively;
3) For a municipality, state, federal, or other public agency - by either a principal executive officer or ranking elected official; or
4) For a military facility - by the base commander or person with authority and responsibility for environmental matters at the facility. b. All other reports required by this General Order and other information required by the Regional Water Board must be signed by a person designated in paragraph (a) above, or by a duly authorized representative of that person. An individual is a duly authorized representative only if:
1) The authorization is made in writing by a person described in paragraph (a) above;
2) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity; and 3) The written authorization is submitted to the Regional Water Board.
August 4, 2015
23 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. Any person signing a document under this section must make the following certification:
"I certify under penalty of law that this document, including all attachments and supplemental information, were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment."
6. Report Submittals –The State Water Board and Regional Water Boards are transitioning to the paperless office system. Dischargers must submit reports (both technical and monitoring reports) to the State Water Board’s GeoTracker database over the Internet in portable document format (PDF) as specified in California Code of Regulations, title 23, section 3892, subdivision (d) and section 3893. In addition, analytical data must be uploaded to the GeoTracker database under a site-specific global identification number.
Information on the GeoTracker database is provided at:
http://www.swrcb.ca.gov/ust/electronic_submittal/index.shtml;
7. Use of Licensed Professionals – The Business and Professions Code sections 6735, 7835, and 7835.1 require that engineering and geologic evaluations and judgments be performed by or under the direction of licensed professionals. Any plan or report submitted in compliance with the requirements of this General Order, which requires technical interpretation, or proposes either a design, or a design change that might affect the composting operation’s containment features, detention ponds, or monitoring systems must be prepared by, or under the direction of, appropriately licensed professionals (e.g., registered civil engineer, professional geologist, or other registered certified specialty geologist) by the State of California. In addition, the licensee must sign and provide his or her registration number, or stamp the submitted plan or report.
NOTIFICATION REQUIREMENTS
1. Revised Notice of Intent – The Discharger must submit a revised NOI to the Regional Water Board, CalRecycle, and the Local Enforcement Agency at least 90 days prior to:
(1) adding a new feedstock, additive, or amendment; (2) changing material or construction specifications; (3) changing a monitoring program; or (4) changing an operation or activity that was not described in the approved NOI and technical report. The Regional Water Board may require submittal of a revised technical report.
2. Change in Ownership Notification Requirements – The Discharger must notify the Regional Water Board, CalRecycle, and the Local Enforcement Agency, in writing, at least August 4, 2015
24 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS 30 days in advance of any transfer of the General Order’s responsibility and coverage from the current owner to a new owner. This notification shall include:
a. A statement of acknowledgment that the current owner is liable for violations occurring up to the transfer date and that the new owner is liable for violations occurring after the date that ownership of the property transfers; and b. The new owner’s NOI and technical report (if applicable).
3. Termination of Enrollment – Enrollment under this General Order may be terminated if any of the following occur:
a. The Regional Water Board, based on site-specific conditions or management practices, may require the Discharger to apply for individual WDRs. The applicability of this General Order to such dischargers will be rescinded upon adoption of individual WDRs;
b. At least 90 days prior to terminating all waste discharge activates, the Discharger must submit a Site Closure Plan to the Regional Water Board for approval. Filing a request by the Discharger for termination of this General Order does not stay any requirements of this General Order; or
c. If the operation is eligible for an exemption due to changes in process or procedures, the Discharger may propose termination. Filing a request by the Discharger for an exemption modification, revocation, reissuance, or termination of this General Order does not stay any requirement of this General Order.
4. Notification of Violations – If a violation of requirements of this General Order or MRP occurs, the Discharger must notify the Regional Water Board by telephone or email, within 48hours, once the Discharger has knowledge of the violation. This notification must include a description of the noncompliance and its cause, the period of noncompliance (dates and times); and if the noncompliance has not been corrected, the anticipated time the noncompliance is expected to continue. The notification must also include steps taken or planned to reduce, eliminate, or prevent recurrence of the noncompliance. Depending on the severity of the violation, the Regional Water Board may require the Discharger to submit a separate technical report regarding the violation within 10 working days of the initial notification.
5. Monitoring Wells – The Discharger must comply with all notice and reporting requirements of the Department of Water Resources, and with any local agency well permitting requirements regarding construction, alteration, destruction, or abandonment of any monitoring wells used for compliance with this General Order and MRP, as required under Water Code sections 13750.5 through 13755, and local agency requirements
ADDITIONAL REQUIREMENTS
1. Duty to Comply – Any noncompliance with this General Order constitutes a violation of the Water Code, and is grounds for enforcement action, and/or termination of enrollment under this General Order.
August 4, 2015
25 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
2. Corrective Action – The Discharger must take all reasonable steps to minimize or correct any adverse impact to the environment resulting from noncompliance with this General Order, including accelerated or additional monitoring necessary to determine the nature and impact of the noncompliance.
3. Responsibility for Monitoring and Maintenance – Dischargers must be responsible for covering the costs associated with the activities necessary to maintain compliance with this General Order.
4. Maintenance Period – The maintenance period must continue until the Regional Water Board finds that all feedstocks, additives, amendments, compost (active, curing, or final product), wastewater, or other waste constituents or degradation products will not threaten waters of the state.
5. Revision of Waste Discharge Requirements – Enrollment under this General Order may be modified, revoked, reissued, or terminated for causes including, but not limited to, the following:
a. Violation of any terms or conditions of this General Order, b. Obtaining this General Order by misrepresentation or failure to disclose relevant facts, or
c. A change in any condition that requires a reduction or elimination of the authorized discharge.
Filing a request by the Discharger for modification, revocation, re-issuance, or termination of this General Order or notification of planned changes or anticipated noncompliance does not stay any condition of this General Order.
6. Change in Ownership – This General Order is not transferable to any person except after notice to the Regional Water Board, CalRecycle, and the Local Enforcement Agency. The Discharger must submit a Change in Ownership Notification, pursuant to the Notification Requirements section of this General Order.
7. Property Rights – This General Order does not convey any property rights of any sort or any exclusive privileges. Requirements prescribed herein do not authorize commission of any act causing injury to persons or property, nor protect the Discharger from liability under federal, state, or local laws or regulations, nor create a vested right for the owner and operator to continue the regulated activity.
8. Entry and Inspection – Under authority of Water Code section 13267, the Discharger must allow the State Water Board and/or Regional Water Board, or an authorized representative, upon presentation of credentials and other documents as may be required by law to:
a. Enter premises where a regulated facility or activity is located or conducted, or where records must be kept under specification of this General Order; b. Have access to copy, at reasonable times, any records that must be kept under specification of this General Order;
August 4, 2015
26 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. Inspect any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or specified under this General Order; d. Sample or monitor for the purposes of determining compliance with this General Order, any substances or parameters at any location; and e. Photograph or video-record any structures, facilities, activities, or other conditions to determine compliance with this General Order.
9. Repository for Waste Discharge Requirements – A complete and correct copy of this General Order, the NOA, and any pertinent technical documents must be maintained at the local offices of the Discharger, and must be available to facility personnel at all times.
10. Severability – Provisions of this General Order are severable, and if any provision of this General Order or application of any provision of this General Order to any circumstance is held invalid, application of such provisions to other circumstances and the remainder of this General Order must not be affected thereby.
11. Effective Date – This General Order becomes effective upon its adoption by the State Water Board.
12. Penalties for Investigations, Monitoring, or Inspection Violations – The State Water Board and Regional Water Boards reserve the right to take any enforcement action authorized by law for violations of any terms and conditions of this General Order. 13 Civil Monetary Remedies – Water Code section 13350 et seq. provides that any person who intentionally or negligently violates any conditions issued or amended by the Regional Water Board or State Water Board, is subject to administrative civil liability of up to $10 per gallon of waste discharged, or up to $5,000 per day of violation. The Superior Court may impose civil liability of up to $10,000 per day of violation or, if a cleanup and abatement order has been issued, up to $15,000 per day of violation.
14. Other Regulations – Dischargers enrolled under this General Order may be subject to additional federal, state, or local regulations.
15. Requesting Judicial Review – Any person aggrieved by this General Order may, not later than 30 days from the date of adoption, file a petition for a writ of mandate for judicial review. Petitions that are not received within 30 days of the State Water Board’s adoption of the General Order will not be eligible for review by any court. (Wat. Code, § 13330 et seq.)
16. Delegation of Authority – By adoption of this General Order, the State Water Board delegates to the nine Regional Water Board Executive Officers, all powers and authority that may be delegated pursuant to Water Code section 13223. The State Water Board intends for the Executive Officers to make modifications or revisions in appropriate cases, to the maintenance and monitoring requirements contained within the MRP for Dischargers enrolled under this General Order; and to grant Dischargers enrollment or termination under this General Order and MRP pursuant to eligibility and termination criteria established in this General Order.
August 4, 2015
27 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
CERTIFICATION
The undersigned, Clerk to the Board, does hereby certify that the foregoing is a full, true, and correct copy of an order duly and regularly adopted at a meeting of the State Water Resources Control Board held on August 4, 2015.
AYE: Chair Felicia Marcus
Vice Chair Frances Spivy-Weber
Board Member Tam M. Doduc
Board Member Steven Moore
Board Member Dorene D’Adamo
NAY: None
ABSENT: None
ABSTAIN: None
Jeanine Townsend
Clerk to the Board
August 4, 2015
28 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
THIS PAGE INTENTIONALLY LEFT BLANK
August 4, 2015
29 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
ATTACHMENT A - DEFINITIONS
For the purposes of this General Order, the following terms, phrases, or abbreviations have a narrow scope of meaning, and are as follows:
Active Compost - Compost feedstock that is in the process of being rapidly decomposed and is unstable. Active compost is generating temperatures of at least 50 degrees Celsius (122 degrees Fahrenheit) during decomposition, or is releasing carbon dioxide at a rate of at least 15 milligrams per gram of active compost per day, or the equivalent of oxygen uptake.
This high temperature on thermophilic phase may last from several days to several weeks.
Additives - Material mixed with feedstocks or active compost in order to adjust the moisture level, carbon to nitrogen ratio, or porosity to create a favorable condition. Additives include, but are not limited to, fertilizers and urea. Additives do not include septage, biosolids, or compost feedstock.
Agricultural Composting - The operation of composting conducted in agricultural settings where: (1) feedstocks consist of materials generated onsite by production of farm, ranch, agricultural, horticultural, silvicultural, floricultural, vermicultural, or viticultural products, for example, orchard and vineyard prunings, culls and crop residues, and spoiled or unsalvageable food commodities (but not including animal carcasses), and; (2) the resulting compost product is returned to that same agricultural site, or an agricultural site owned by the owner of the composting activity and applied at an agronomic rate. No more than an incidental amount of up to 1,000 cubic yards of compost product may be given away or sold annually.
Agricultural Material - Consists of pre-consumer plant materials coming directly from lands used in the production of farm, agricultural, horticultural, aquacultures, silvicultural, floricultural, vermicultural, or viticultural products, including orchard and vineyard prunings, and crop residues. Agricultural material does not include manure.
Amendments - Materials added to stabilized compost or cured compost to provide attributes for certain compost products, such as product bulk, product nutrient value, product pH, and soils blend. Amendments do not include septage, biosolids, or compost feedstock.
Anaerobic Digestate - The solid portion of the material remaining after the anaerobic digestion of any combination of agricultural materials, biosolids, sewage sludge, food materials, green materials, manure, paper materials, or vegetative food materials. Dewatered digestate contains organic matter that may need to be further treated to stabilize it, usually through aerated composting.
Animal Carcasses - Refers to any whole or part (including, but may not be limited to the flesh, organs, blood, bones, and marrow) of a carcass of a bird, fish, or mammal, which cannot meet the definition of “food material.”
A-1
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Background Water Quality - The concentrations or measures of constituents or indicator parameters in water or soil that have not been affected by waste constituents from the area being monitored.
Beneficial Uses - Pursuant to division 7, section 13050, subdivision (f) of the Water Code. “Beneficial uses” of waters of the state that may be protected against degradation include, but are not limited to, domestic, municipal, agricultural and industrial supply, power generation, recreation, aesthetic enjoyment, navigation, and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.
Best Management Practice - A practice, or combination of practices, that is the most effective and feasible means of controlling degradation or pollution generated by nonpoint sources for the attainment of water quality objectives.
Biosolids - Sewage sludge that has been treated, tested, and meets:
1. The Ceiling Concentration Limits in Table 1 of 40 Code of Federal Regulations section 503.13;
2. The Class A or Class B pathogen control requirements in 40 Code of Federal Regulations part 503.32(a) or (b); and
3. One of the Vector Attraction Reduction requirements in 40 Code of Federal Regulations part 503.33(b)(1—8).
Exceptional Quality (EQ) biosolids – Biosolids meeting metals standards, Class A pathogen reduction standards, and one of the vector attraction reduction standards contained in 40 Code of Federal Regulations sections 503.13 (Table 3), section 503.32(a), and section 503.33(b) (1—8), respectively
Brine - Water saturated with or containing large amounts of common salt (sodium chloride), or a strong saline solution (e.g., calcium chloride).
California Environmental Quality Act (CEQA) - Refers to the statute promulgated in Public Resources Code, beginning with section 21000, and regulations promulgated in California Code of Regulations, title 14, chapter 3, beginning with section 15000, requiring state and local agencies to identify the significant environmental impacts of their actions and to avoid or mitigate those impacts, if feasible.
CalRecycle - The Department of Resources Recycling and Recovery (formerly the California Integrated Waste Management Board), which is the lead agency for implementing the state’s municipal solid waste permit program that is deemed to be adequate by U.S. EPA under regulations published pursuant to sections 2002 and 4005 of the Resource Conservation and Recovery Act of 1976.
Chipping and Grinding Facilities and Operations - Facilities or operational areas that do not produce compost, but mechanically reduce the size or otherwise engage in the handling of “green material.” Each load of “green material” must be removed from the site within 48-hours A-2
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS from receipt, unless the Discharger has received written permission from the Local Enforcement Agency allowing the “green material” to remain onsite for up to 7 days.
Composting - A controlled microbial degradation of organic wastes yielding a safe and nuisance-free product.
Composting Conducted at a Publicly Owned Treatment Works - Refers to the composting of treated biosolids at a publicly owned treatment works, currently operating pursuant to permit or waste discharge requirements issued by a Regional Water Board or the State Water Board.
Composting Operation - shall mean the areas at which operations are conducted, including the receiving area, pre-processing, processing, curing, storage areas, detention ponds, and other areas associated with production of compost, including storage areas for feedstocks, additives, and/or amendments.
Constituent - An element or compound which occurs in or is likely to be derived from waste handled by a composting operation.
Constituent(s) of Concern - Any waste constituent(s), reaction product(s), and hazardous constituent(s) that is reasonably expected to be in or derived from waste handled by the composting operation.
Construction Quality Assurance - A planned system of activities that provides assurance that the facility or component thereof, is constructed as specified in the approved design. As used in this General Order, the term includes “Construction Quality Control,” a planned system of inspections that is used to directly monitor and control the quality of a construction project.
Containment Structures - Refers to any berm, ditch, working surface, detention pond, or other mechanism approved by the Regional Water Board at a Composting Operation designed, constructed, and maintained to limit feedstocks, additives, amendments, and/or compost (active, curing, or final product) from threatening to cause, causing, or contributing to conditions of contamination, pollution, or nuisance.
Contamination - Defined in section 13050, subdivision (k) of the Water Code.
Curing Compost - The final stage of the composting process that occurs after compost has undergone pathogen reduction, as defined in California Code of Regulations title 14, section 17868.3, and after most of the readily metabolized material has been decomposed and stabilized. This curing phase begins after an active compost pile endures a sustained drop in temperature as remaining materials continue to decompose, but at a much slower rate. This helps to further decompose and stabilize potentially toxic organic acids and resistant compounds. The curing process helps bring compost to full-maturity, and can last several months.
Day - A calendar day unless otherwise specified.
A-3
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Depth to Groundwater - The vertical distance measured, in feet, from the ground surface to the highest anticipated groundwater level.
Detention Pond - An excavated or diked area designed to capture and hold any wastewater.
Discharge - The accidental or intentional spilling, leaking, pumping, pouring, emitting, emptying or dumping of wastes into or on any land or water.
Discharger - Any person who discharges waste which could affect the quality of waters of the state, and includes any person who owns a Composting Operation or who is responsible for the operation.
Distance to Nearest Water Supply Well - The horizontal distance measured, in feet, from the nearest edge of the composting operation to the center of the water supply well head.
Distance to Nearest Surface Water - Horizontal distance measured, in feet, from the nearest edge of the composting operation to the edge of the high water mark for lakes and reservoirs, mean high tide line for tidally influenced water bodies, or the natural or levied bank for creeks and rivers.
Electronic Deliverable Format - Defined in California Code of Regulations, title 23, division 3, chapter 30, article 1, section 3891.
Evapo-concentration - The process by which the ratio of solute to water solvent is increased by the removal of the solvent and retention of the solute.
Feedstocks - Materials used in the production of compost. Feedstocks shall not be considered as either additives or amendments.
Fertilizing Material - Defined in division 7, section 14533 of the Food and Agriculture Code.
Final Product - The compost material that has completed the curing phase. Residual substances originally present in the compost pile are consumed after proper curing. The compost has been brought to maturity, and organic acids and resistant compounds have been substantially decomposed.
Food Material - Solid, and/or semi-solid materials resulting from the production or processing of food for animal or human consumption, but is no longer intended for such consumption, that is separated from the municipal solid waste stream. Food material includes, without limitation, food waste from food facilities (as defined in Health and Safety Code, section 113789), food processing establishments (as defined in Health and Safety Code, section 111955), grocery stores, institutional cafeterias (such as prisons, schools, and hospitals), restaurants, and residential food scrap collection. Food material may include meat and materials incidental to a food scrap collection program. Food material shall not contain any substance included in the Prohibitions section of this General Order.
Geocomposite Liner - A manufactured material using geotextiles, geogrids, geonets, and/or geomembranes in laminated or composite form.
A-4
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Geomembrane - Flexible materials in planar form manufactured to meet specific engineering purposes. Commonly, they are used as a barrier to waste solids and fluids. The term “geomembrane” is synonymous with “synthetic liner” and “flexible membrane liner”.
GeoTracker - The State Water Board database as defined in California Code of Regulations, title 23, section 3891.
Green Composting Waiver - Refers to the “Conditional Waiver of Waste Discharge Requirements for Composting Operations.” Adopted by most Regional Water Boards in 1996, this waiver covered the composting of green waste, some food processing waste, agricultural waste, and paper waste discharged to land with a volume in excess of 500 cubic yards.
Green Material - Any plant material that is separated at the point of generation and consists of, or contains, materials from plants, including leaves, clippings, cuttings, trimmings of grass, weeds, shrubbery, bushes, or trees, residential or community garden waste, and untreated wood waste. Green material does not include food material, biosolids, material processed from commingled collection, wood containing lead-based paint or wood preservative, mixed construction or mixed demolition debris.
Groundwater - Water below the ground surface that is at or above atmospheric pressure (i.e., perched, unconfined, or confined water).
Groundwater Elevation - The vertical distance measured, in feet, from mean sea level to the water table of the first encountered groundwater below the ground surface.
Hydraulic conductivity - The ability of natural and artificial materials to transmit fluid. For water, including aqueous solutions, the term is expressed as a measure of the rate of flow (e.g., cubic centimeters per second) one can expect through a unit-area (e.g., one square centimeter) cross section of the material under a unit hydraulic gradient (e.g., one centimeter of head loss per centimeter of travel through the material). The resulting numerical value is expressed in velocity units (e.g., centimeters per second).
Leachate - Any liquid formed by the drainage of liquids from, or percolation/flow of liquids through any feedstock, additive, amendment, or compost (active, curing, or final product) pile.
Liquid Food Material - Liquid materials resulting from the production or processing of food for animal or human consumption - but is no longer intended for such consumption - that is separated at the point of generation from the waste stream (e.g., cheese whey, brewery waste, etc.). Liquid food material shall not contain either: brines or any waste included in the Prohibitions section of this General Order.
Liquid Wastes - Waste materials which are not spadeable or in a physical state where the waste materials behave sufficiently like a solid to be moved by a spade at normal outdoor temperatures.
A-5
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Liner - A material or combination of materials designed, constructed, and maintained to contain any wastewater feedstock, additive, amendment, or compost (active, curing, or final product) discharged to land.
Local Enforcement Agencies (LEA) - Agencies that are designated by the governing body of a county or city and, upon certification by CalRecycle, are empowered to implement delegated CalRecycle programs and locally designated activities.
Lot Clearing for Fire Protection - Refers to the storage of yard trimmings at a publicly designated site for the collection of lot clearing necessary for fire protection provided that the public agency designating the site has notified the fire protection agency.
Manure - Accumulated excrement (e.g., cattle manure, chicken manure, pig manure), which includes feces and urine, and any bedding material, spilled feed, or soil that is mixed with feces or urine that does not exceed its moisture holding capacity.
Major Storm Event - Is defined as a minimum of one inch of precipitation within 24 hours.
Moisture Holding Capacity - The amount of liquid which can be held against gravity by waste materials without generating free liquid.
National Pollutant Discharge Elimination System (NPDES) - Refers to the national program under Clean Water Act section 402 (33 U.S.C. § 1342), for regulation of discharges of pollutants from point sources to waters of the United States. Discharges are illegal unless authorized by a National Pollutant Discharge Elimination System permit.
Nonhazardous Solid Waste - Means all putrescible and nonputrescible solid, semi-solid, and liquid wastes, including garbage, trash, refuse, paper, rubbish, ashes, industrial wastes, demolition and construction wastes, abandoned vehicles and parts thereof, discarded home and industrial appliances, manure, vegetable or animal solid and semi-solid wastes and other discarded waste (whether of solid or semi-solid consistency); provided that such wastes do not contain wastes which must be managed as hazardous wastes, or wastes which contain soluble pollutants in concentrations which exceed applicable water quality objectives, or could cause degradation of waters of the state (i.e., designated waste).
Nuisance - Defined in section 13050, subdivision (m) of the Water Code.
Pad - See definition for “working surface.”
Paper Material - Nonhazardous paper and paper by-products (including paper, cardboard, tissue, and other products manufactured from vegetative fibers).
Percolation test - A method of testing water absorption of soil. The percolation test shall be conducted as follows or an approved alternative: a minimum of six percolation tests shall be required as follows:
1. Four holes shall be spaced uniformly throughout the operations pad area to a minimum of 24 inches deep; and
A-6
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
2. Two holes outside the perimeter of the detention pond nearest the deepest corner. The holes shall be dug a minimum of 24 inches below the deepest part of the pond.
3. Percolation testing shall be conducted in accordance with local codes and ordinances and performed under the direction of a Professional Geologist, Civil Engineer, or Registered Environmental Health Specialist.
Pollution - Defined in section 13050, subdivision (l) of the Water Code.
Portable Document Format (PDF) - Defined in California Code of Regulations, title 23, division 3, chapter 30, article 2, section 3891.
Precipitation - Is any condensate of atmospheric water vapor and includes hail, mist, rain, sleet, or snow.
Publicly Owned Treatment Works (POTW) - Is as defined in part 403, section 403.3(q) of 40 Code of Federal Regulations.
Radioactive Material - Defined in California Code of Regulations, title 17, section 30100, subdivision (q).
Residentially co-collected or self-hauled food and green materials - Food scraps, food soiled paper, and related items that are produced in a residential setting and are set out to be co-collected with green materials (i.e. yard trimmings) as part of a municipal co-collection, or self-hauled program. No more than 10 percent of residential food material may be comingled with green materials.
Regional Water Quality Control Board (Regional Water Board) - All references to a Regional Water Board, include the Executive Officer, who may act for the Regional Water Board in carrying out this General Order. (Wat. Code, § 13050, subd. (b) & § 13223.) Residual - The waste destined for disposal or recycling, and removed from the site.
Runoff - Any precipitation, wastewater, or other liquids that drain from any part of a Composting Operation.
Run-on - Any precipitation, wastewater, or other liquids that drain onto any part of the Composting Operation.
Separated at the Point of Generation - Includes material separated from the waste stream by the generator of that material. It may also include material from a centralized facility as long as that material was kept separate from the waste stream prior to receipt by that facility and the material was not commingled with other waste during handling.
Septage - Any waste removed from a septic tank, cesspool, portable toilet, Type III marine sanitation device, or similar wastewater handling device that has not passed through a municipal wastewater treatment facility.
A-7
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Sewage Sludge - Any solid, semi-solid, or liquid residue generated during the treatment of domestic sewage in a municipal wastewater treatment facility. It includes solids removed or used during primary, secondary, or advanced wastewater treatment processes. It does not include grit or screening material generated during preliminary treatment of domestic sewage at a municipal wastewater treatment facility. Sewage sludge does not include biosolids that meet the criteria in Table 1 of 40 Code of Federal Regulations section 503.13.
Significant Maintenance Activities - Refers to, but may not be limited to, those activities which could alter existing surface drainage patterns, change the existing slope configuration, occur as a result of repairing surfaces or conveyances that were damaged, or result in the installation or destruction of any monitoring system at the composting operation (e.g., groundwater monitoring well, lysimeter, etc.).
Sludge - Refers to the solid, semi-solid, or liquid residue produced by water, wastewater, or sewage treatment processes.
Source Separated - Materials that have been separated or kept separate from the waste stream, at the point of generation, for the purpose of composting.
Tier I Feedstocks - The following are allowable Tier I feedstocks: agricultural materials, green materials, paper materials, vegetative food materials, residentially co-collected food and green materials, anaerobic digestate derived from allowable Tier I feedstocks, and a combination of allowable Tier I feedstocks.
Tier II Feedstock - The following are allowable Tier II feedstocks: food materials (non-vegetative); biosolids (Class A, B, and/or EQ) as defined by 40 Code of Federal Regulations part 503; manure; anaerobic digestate derived from allowable Tier II feedstocks; and a combination of allowable Tier I and Tier II feedstocks.
Vegetative Food Material - Food material resulting from the production or processing of food for animal or human consumption, but is no longer intended for such consumption, that is derived solely from plants and is separated from the municipal solid waste stream. Vegetative food material may be processed or cooked but must otherwise remain in its essentially natural state and no salts, preservatives, fats, oils, or other adulterants have been added.
Water Quality Control Plan (Basin Plan) - Defined in division 7, section 13050, subdivision (j) of the Water Code.
Wastewater - Refers to leachate or any other liquid flowing from, or on the working surface.
Water Boards - Refers collectively to the State Water Resources Control Board and the nine Regional Water Quality Control Boards.
Waste - Defined in Water Code section 13050, subdivision (d).
Water Quality Objectives - Defined in Water Code section 13050, subdivision (h).
Waters of the State - Defined in Water Code section 13050, subdivision (e).
A-8
August 4, 2015
ATTACHMENT A - DEFINITIONS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Wet Season - Defined as October 1 through April 30.
Working Surface - Any area at a Composting Operation used for the storage and/or treatment of feedstocks, additives, amendments, or compost (active, curing, or final product). The final product area may be excluded from the working surface hydraulic conductivity requirements under the following conditions:
The area is isolated in a dedicated area away from the active and curing compost; The area is clearly marked as “final product” and
The area is identified in the NOI and technical report and approved by the Regional Water Board.
Within Vessel and Fully enclosed - Refers to the action of receiving, composting, curing or storing any feedstock within a fully enclosed vessel or container (e.g., drum, silo, bin, bunker, tunnel, reactor, fabric-covered aerated static piles) where the organic material is covered on all sides and rests on a stable surface with environmental controls for managing all wastewaters.
A-9
August 4, 2015
THIS PAGE INTENTIONALLY LEFT BLANK
August 4, 2015
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS ATTACHMENT B – MONITORING AND REPORTING PROGRAM
This Monitoring and Reporting Program (MRP) is issued pursuant to Water Code section 13267.
The Discharger shall not implement any changes to this MRP unless and until a revised MRP is issued by the Regional Water Board.
This MRP includes monitoring, reporting and record keeping requirements for composting operations. Monitoring requirements include facility inspections, detention basin water quality, groundwater protection monitoring, and general sampling, as appropriate. Reporting includes requirements for the Annual Monitoring and Maintenance Report, notification of violations, and reporting of significant events. Record keeping describes the types of information and length of time that the Discharger must keep and maintain reports.
The Discharger owns and/or operates the composting operation subject to the NOA and this General Order. The reports are necessary to ensure that the Discharger complies with the NOA and the General Order. Pursuant to Water Code section 13267, the Discharger shall implement this MRP and shall submit monitoring reports described herein.
A. ROUTINE MONITORING REQUIREMENTS
1. FACILITY INSPECTIONS
Any discharger enrolled under this General Order must inspect the composting operation in accordance with the following schedule and record, at a minimum, the observations described below:
a. Operations Areas – Perform quarterly inspections of the working surfaces, berms, ditches, facility perimeter, erosion control best management practices (BMPs), and any other operational surfaces (as specified in the NOI and/or a technical report, and approved by the Regional Water Board). The Discharger shall include the following observations in the Annual Monitoring and Maintenance Report:
1) Date and time of inspections, along with the name of the inspector; 2) Evidence of areas of deficiency such as cracking or subsidence in the working surfaces;
3) Evidence of ponding over the working surfaces and within ditches (show affected area on a map);
4) Effectiveness of erosion control BMPs;
5) Maintenance activities associated with, but not limited to, the working surfaces, berms, ditches, and erosion control BMPs;
6) Evidence of any water or wastewater leaving or entering the facility, estimated size of affected area, and estimated flow rate (show affected area on a map); 7) Integrity of drainage systems during the wet season; and 8) Photographs of observed and corrected deficiencies.
B-1
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS b. Wastewater Management System - Perform quarterly inspections of the wastewater management system and submit the following observations and records in the Annual Monitoring and Maintenance Report:
1) Date and time of inspections along with name of inspector; 2) The overall condition of the wastewater management system (i.e. pond liner, storage tank construction, municipal wastewater connection points); 3) The available capacity within storage systems and the current volume of wastewater (gallons) or solids (cubic yards) contained; 4) Presence of odors from the wastewater management system – characterization, source, and distance from source;
5) Volume of wastewater treated and discharged, if applicable; and 6) Volume of wastewater disposed at an off-site treatment system and name and location of the wastewater treatment facility, if applicable. c. Annual Survey – Perform annual survey of the facility to confirm that all containment structures are prepared for the pending wet season. Dischargers shall conduct an annual survey prior to the anticipated wet season, but no later than August 31 and complete any necessary construction, maintenance, or repairs by October 31. The Discharger shall include the following in the Annual Monitoring and Maintenance Report:
1) The observation date and time of the survey, along with the name of the inspector
2) The type of deficiency/non-compliance observed;
3) The cause for the deficiency/noncompliance;
4) Map showing the area of deficiency/noncompliance;
5) The corrective actions undertaken, or planned to resolve the deficiency/non-compliance, including the date and time of repairs; 6) The measures undertaken by the Discharger to prevent the recurrence of the observed deficiency/noncompliance; and
7) Photographs of the observed deficiencies/noncompliance with corresponding location on the map.
d. Major Storm Events - The Discharger shall inspect all precipitation, diversion, and drainage facilities for damage within 7 days following major storm events.
Necessary repairs shall be completed within 30 days of the inspection. The Discharger shall report any damage and subsequent repairs including photographs of the problem and repairs in the Annual Monitoring and Maintenance Report.
B-2
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
2. DETENTION POND MONITORING (IF APPLICABLE)
a. Any Discharger enrolled under this General Order that has a detention pond to manage wastewater onsite must conduct monitoring of the wastewater within the detention pond quarterly when there is sufficient water and analyze the sample for the parameters listed Table B-1. Water sample analyses shall be conducted by a laboratory certified for such analyses by the State Water Board’s Environmental Laboratory Accreditation Program. These laboratory analyses shall be conducted in accordance with 40 Code of Federal Regulations part 136 (Guidelines Establishing Test Procedures for the Analysis of Pollutants) or other test methods approved by the Regional Water Board.
Table B-1
Detention Pond Monitoring
Constituent Units Sample Frequency Reporting Frequency
pH std. units Quarterly Annually
Dissolved Oxygen mg/L Quarterly Annually
Total Dissolved Solids mg/L Quarterly Annually
Fixed Dissolved Solids mg/L Quarterly Annually
Total Nitrogen mg/L Quarterly Annually
Specific Conductance µmhos/cm Quarterly Annually
Note: These field parameters are measured during each sampling event.
Detention Pond Leak Detection Monitoring (Tier II only) – The leak detection monitoring device (i.e. pan lysimeter) shall be checked monthly during the wet season for liquid. Upon detection of liquid in a previously dry monitoring device Discharger shall notify the Regional Water Board within 48 hours; collect a sample and analyze the liquid for the constituents listed in Table B-1; remove the liquid from the device; and continue to monitor weekly. If liquid reappears, another sample must be collected and analyzed for the constituents in Table B-1. If the liquid is confirmed to be wastewater, the Discharger must submit a Response Action Plan within 30 days for review and approval by the Regional Water Board. b. The results of any monitoring conducted more frequently than required at the locations specified in this General Order shall be reported to the Regional Water Board.
3. BIOSOLIDS MONITORING (IF APPLICABLE)
a. Any Discharger enrolled under this General Order that uses biosolids as a feedstock, shall present analytical results from a certified laboratory to show proof that the biosolids meet, at a minimum, with the ceiling concentrations listed in Table 1 of 40 Code of Federal Regulations part 503. Biosolids may be characterized by the entity that generates or otherwise processes the material. Use of analytical data prepared by such an entity may be accepted in lieu of the sampling listed below. The characterization shall contain a description of the sample procedures, the analytical B-3
August 4, 2015
Table B-2
Biosolids Monitoring
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS report, and a statement by a responsible person that the characterization was performed in a way that accurately characterizes the quality of the biosolids. The statement shall be signed by, and shall contain the certification language contained in the General Order under Reporting Requirements. U.S. EPA regularly reviews, and may revise, the limitations and requirements of 40 Code of Federal Regulations part 503 and should be reviewed for updates.
b. Any discharger enrolled under this General Order that uses biosolids as a feedstock and does not show results from a certified laboratory shall perform monitoring to characterize the material for the parameters listed in Table B-2. The characterization shall contain a description of the sample procedures, the analytical report, and a statement by a responsible person that the characterization was performed in a way that accurately characterizes the quality of the biosolids. The statement shall be signed by, and shall contain the certification language contained in the General Order under Reporting Requirements.
Constituent Units Sample Frequency Reporting Frequency
Arsenic mg/kg Sample each delivery Annually
Cadmium mg/kg Sample each delivery Annually
Copper mg/kg Sample each delivery Annually
Lead mg/kg Sample each delivery Annually
Mercury mg/kg Sample each delivery Annually
Molybdenum mg/kg Sample each delivery Annually
Nickel mg/kg Sample each delivery Annually
Selenium mg/kg Sample each delivery Annually
Zinc mg/kg Sample each delivery Annually
4. GROUNDWATER PROTECTION MONITORING (IF APPLICABLE)
a. A Discharger that is required to perform groundwater monitoring due to site conditions shall perform the monitoring shown in Table B-3. Sample analysis shall be conducted by a laboratory certified by the State Water Board’s Environmental Laboratory Accreditation Program. These laboratory analyses shall be conducted in accordance with 40 Code of Federal Regulations part 136 (Guidelines Establishing Test Procedures for the Analysis of Pollutants) or other test methods approved by the Regional Water Board.
b. Discharger is required to implement the sampling and analysis program detailed in the approved Groundwater Protection Monitoring Plan submitted with the NOI as part of the accompanying technical report described in Attachment D, which is hereby incorporated by reference as part of this MRP.
B-4
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. The results of any monitoring conducted more frequently than required at the locations specified in this General Order shall be reported to the Regional Water Board.
Table B-3
Groundwater Monitoring
Constituent Units Sample Frequency Reporting Frequency
Groundwater Elevation a 0.01 Feet Quarterly Annually
Depth to Groundwater 0.01 Feet Quarterly Annually
Gradient Feet/Feet Quarterly Annually
Gradient Direction Degrees Quarterly Annually
pH Std. Units Quarterly Annually
Total Dissolved Solids mg/L Quarterly Annually
Nitrate as Nitrogen mg/L Quarterly Annually
Sodium mg/L Quarterly Annually
Chloride mg/L Quarterly Annually
Total Coliform Organisms b MPN/100 mL Quarterly Annually a. Groundwater elevation shall be based on depth to water using a surveyed measuring point elevation on the well and a surveyed reference elevation. b. Using a minimum of 15 tubes, or three dilutions.
5. GENERAL SAMPLING REQUIREMENTS
a. The Discharger shall use clean sample containers and sample handling, storage, and preservation methods that are accepted or recommended by the selected analytical laboratory or, as appropriate, in accordance with approved U.S. EPA analytical methods.
b. All samples collected shall be representative of the volume and nature of the material being sampled.
c. All sample containers shall be labeled and records maintained to show the time and date of collection as well as the person collecting the sample and the sample location.
d. All samples collected for laboratory analyses shall be preserved and submitted to the laboratory within the required holding time appropriate for the analytical method used and the constituents analyzed.
e. All samples submitted to a laboratory for analyses shall be identified in a properly completed and signed Chain of Custody form.
f. Field instruments may be used provided:
1) The operator is trained in the proper use and maintenance of the instruments; 2) The instruments are field calibrated prior to each monitoring event; and 3) Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency.
B-5
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS g. Analytical results falling between the method detection limit (MDL) and the practical quantitation limit (PQL) shall be reported as “estimated,” be accompanied by documents reporting both the MDL and PQL values for that analytical run, and be flagged appropriately (i.e., “J-flagged”).
h. MDLs and PQLs shall be derived by the laboratory for each analytical procedure in accordance with the State Water Board’s Environmental Laboratory Accreditation Program. In a relatively interference-free laboratory, derived MDLs and PQLs are expected to agree closely with published U.S. EPA MDLs and PQLs. i. If the laboratory suspects that, due to a change in matrix or other effects, the MDL or PQL for a particular analytical run differs significantly from historic MDL or PQL values, results shall be flagged and reported in the quality assurance/quality control (QA/QC) report.
j. The MDL shall always be calculated such that it represents the lowest achievable concentration associated with a 99 percent reliability of non-zero results. k. The PQL shall represent the lowest concentration at which a numerical value can be assigned with reasonable certainty.
l. All quality assurance/quality control data shall be reported, along with sample results to which it applies. This information shall include method, equipment, analytical detection, quantitation limits, recovery rates, an explanation for any recovery rate that is outside method specifications, results of equipment and method blanks, results of matrix spikes and surrogate samples, and the frequency of quality control analysis. Sample results shall be reported unadjusted for blank results or spike recovery. In cases where contaminants are detected in the quality assurance/quality control samples (i.e., field, trip, or laboratory blanks), the accompanying sample results shall be appropriately flagged.
B. REPORTING REQUIREMENTS
1. ANNUAL MONITORING AND MAINTENANCE REPORT
The Annual Monitoring and Maintenance Report shall be submitted to the Regional Water Board by April 1st each year. The Discharger must submit this report in a searchable, electronic format (i.e., Portable Document Format (PDF) and Electronic Deliverable Format (EDF) via the State Water Board’s Internet GeoTracker system at <http://geotracker.waterboards.ca.gov/> as required by this General Order. The report must include the following:
a. A transmittal letter explaining the essential points shall accompany each report. At a minimum, the transmittal letter shall identify any violations found since the last report was submitted and a description of the actions taken or planned for correcting those violations, including any references to previously submitted time schedules. If no violations have occurred since the last submittal, this shall be stated in the transmittal letter;
b. A map or aerial photograph showing the locations of observation stations and monitoring points;
B-6
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. Tabular and graphical summaries of all water quality data collected during the year, including wastewater monitoring if applicable; and
d. All historical monitoring data collected during the previous 5 years, and for which there are detectable results, including data for the previous year, shall be submitted in tabular form and in a digital file format.
e. Monitoring information must include at a minimum:
1) The date, identity of sample, monitoring point from which the sample was collected, and time of sampling or measurement;
2) The name of the individual(s) who performed the sampling or measurements; 3) Date and time that analyses were started and completed; 4) The analytical techniques or method used, including method of preserving the sample and the identity and volume of reagents used; and 5) Field instrument calibration logs.
f. Copy of the complete laboratory analytical report(s), signed by the laboratory director or project manager, and at a minimum contain:
1) Complete sample analytical reports;
2) Complete laboratory QA/QC reports;
3) A discussion of the sample and QA/QC data;
4) A properly completed “chain of custody” from the analyzed samples; and 5) A transmittal letter stating whether or not all of the analytical work was supervised by the director of the laboratory, and contain the following statement:
“All analyses were conducted at a laboratory certified for such analyses by the State Water Board’s Environmental Laboratory Accreditation Program in accordance with current U.S. EPA procedures.”
g. Results and discussion from the annual survey;
h. Results and discussion of the groundwater protection monitoring, if applicable, including statistical analysis as submitted in the NOI and accompanying technical report, and approved by the Regional Water Board;
i. A summary of completion of inspections and maintenance of the working surfaces, berms, ditches, erosion control BMPs or other containment structures; j. An evaluation of completion of inspections and maintenance on the effectiveness of the wastewater handling facilities including results of the annual testing of wastewater, capacity issues, nuisance conditions, and system problems; k. A comprehensive discussion of the compliance record, and the result of any corrective actions taken or planned which may be needed to bring the Discharger into full compliance with this General Order; and
l. A discussion of any data gaps and potential deficiencies/redundancies in the monitoring system or reporting program.
B-7
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
2. NOTIFICATION OF VIOLATIONS
If the Discharger determines there has been a violation of the requirements specified in either the General Order or this MRP, the Discharger must notify the Regional Water Board office by telephone or email, within 48 hours, once the Discharger has knowledge of the violation. The notification must include a description of the noncompliance and its cause, the period of noncompliance (dates and times); and if the noncompliance has not been corrected, the anticipated time the noncompliance is expected to continue. The notification must also include steps taken or planned to reduce, eliminate, or prevent recurrence of the noncompliance.
The Regional Water Board may, depending on the severity of the violation, require the Discharger to submit a separate technical report regarding the violation within 10 working days of the initial notification.
3. PRIORITY REPORTING OF SIGNIFICANT EVENTS
The Discharger shall report any noncompliance that endangers human health or the environment within 24 hours of becoming aware of its occurrence. The incident shall be reported to the Regional Water Board, the local environmental health department, and to the California Governor’s Office of Emergency Services (CalOES). During non-business hours, the Discharger shall leave a message on the Regional Water Board’s voice mail.
The message shall include the time, date, place, and nature of the noncompliance, name, and number of the reporting person, and shall be recorded in writing by the Discharger.
CalOES is operational 24 hours a day. A written report shall be submitted to the Regional Water Board office within 10 working days of the Discharger becoming aware of the incident. The report shall contain a description of the noncompliance, causes, duration, and the actual or anticipated time for achieving compliance. The report shall include complete details of steps that the Discharger has taken or intends to take to prevent recurrence. All intentional or accidental spills shall be reported as required by this provision. The written submission shall contain:
a. The approximate date, time, and location of the noncompliance including a description of the ultimate destination of any unauthorized discharge and the flow path of such discharge to a receiving water body;
b. A description of the noncompliance and its cause;
c. The flow rate, volume, and duration of any discharge involved in the noncompliance; d. The amount of precipitation (in inches) the day of any discharge and for each of the seven days preceding the discharge;
e. A description (location, date and time collected, field measurements of pH, temperature, dissolved oxygen and electrical conductivity, sample identification, date submitted to laboratory, and analyses requested) of noncompliance discharge samples and/or surface water samples taken;
f. The period of noncompliance, including dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; B-8
August 4, 2015
ATTACHMENT B – MONITORING AND REPORTING PROGRAM
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS g. A time schedule and a plan to implement corrective actions necessary to prevent the recurrence of such noncompliance; and
h. The laboratory analyses of the noncompliance discharge sample and/or upstream and downstream surface water samples shall be submitted to the Regional Water Board office within 45 days of the discharge.
C. RECORD-KEEPING REQUIREMENTS
The Discharger must retain records of all monitoring information, including all calibration and maintenance records, and copies of all reports required by this MRP, for a minimum of 5 years from the date of sample, measurement, report, or application. This period may be extended during the course of any unresolved litigation regarding the discharge or when requested by the Regional Water Board. Records of monitoring information must include at a minimum:
a. The date, identity of sample, monitoring point from which the sample was collected, and time of sampling or measurement;
b. The name of the individual(s) who performed the sampling or measurements; c. Training logs and records;
d. Date and time that analyses were started and completed; e. The analytical techniques or method used, including method of preserving the sample and the identity and volume of reagents used;
f. Calculation of results;
g. Results of analyses performed and method used (as proposed in an NOI and accompanying technical report, and approved by the Regional Water Board) for calculating the concentration limits for each naturally occurring constituents, based on background water quality monitoring data;
h. Results of analyses and the MDL for each non-naturally occurring constituent; i. Laboratory quality assurance results (e.g., percent recovery, response factor, etc.); and
j. Chain of Custody forms.
Ordered by:________________________
Regional Water Board
Executive Officer
B-9
August 4, 2015
THIS PAGE INTENTIONALLY LEFT BLANK
August 4, 2015
_______________
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS ATTACHMENT C – NOTICE OF INTENT
DISCHARGER INFORMATION
Owner Name:
Street Address:
City/Locale: County: State: Zip: Telephone Number:
Facsimile Number: Email Address:
Owner Type (check one): □ Individual □ Corporation □ Partnership □ Other:
Operator Name (if different than above):
Mailing Address:
City/Locale: County: State: Zip: Telephone Number:
Facsimile Number: Email Address:
1. COMPOSTING OPERATION INFORMATION
Compost Facility Name:
Street Address:
City/Locale: County: State: Zip: Telephone Number:
Type (check one):
□ Existing Composting Operation
□ New Composting Operation
Facility Acreage (acres):
Total Facility Capacity (cubic yards):
Average Weekly Throughput (cubic yards per week):
Assessor Parcel Number(s): Regional Water Board Office:
Latitude __ ___’ ___” Longitude __ ___’ ___” Regional Water Board Address:
2. REASONS FOR FILING
□ New Discharge □ Existing Discharge □ Expansion or Change in Operations □ Changes in Ownership/Operator □ Other:
3. STORM WATER PERMIT
Is there an Industrial Storm Water Permit for this facility? □ Yes □ No If yes, WDID Number:
Related to storm water, have you received a “No Exposure Certification”, “Notice of Termination”, or “Notice of Exemption” for this facility? □ Yes □ No If yes, please provide a copy.
The Notice of Intent for coverage under the Industrial Storm Water Permit may be obtained over the internet at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/industrial.shtml August 4, 2015 C-1
ATTACHMENT C - NOTICE OF INTENT
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
4. OTHER PERMITS
Has another agency issued permits or other entitlements (e.g., solid waste facility permit, notification permit, conditional use permit, building permits, air permits) for the unit? □ Yes □ No For each permit or entitlement, list the type, issuing agency, and date of issuance:
5. CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
Has a CEQA determination been made by an agency? □ Yes □ No Name of Agency:
Type and Date of Determination: State Clearinghouse Number:
6. PROCESS
Allowable Materials (check all that apply, and specify the quantity onsite at any time):
□ agricultural material cu. yds.: □ anaerobic digestate cu. yds.:
□ biosolids (Class A, B, or cu. yds.: EQ) □ food material (non-vegetative) cu. yds.:
□ green material cu. yds.: □ manure cu. yds.:
□ paper material cu. yds.: □ vegetative food material cu. yds.:
□ residentially co-collected cu. yds.:
food and green material
Current Processing Capacity (cubic yards):
Months during which compostable materials will be on-site:
Additives/Amendments and maximum dry weight percentage used (list):
7. SITE CONDITIONS
Anticipated highest groundwater elevation (feet mean sea level):
Average ground surface material percolation rate (minutes per inch) or attach results of percolation testing:
Annual average precipitation (inches per year):
Distance to nearest water supply well (feet):
Closest surface water and distance (name, feet):
8. DESIGN SPECIFICATION TIERS (check one)
□ Tier I □ Tier II □ Tier II (monitoring)
If the box for Tier II (monitoring) has been marked, provide the proposed Groundwater Protection Monitoring Plan with Technical Report.
August 4, 2015 C-2
ATTACHMENT C - NOTICE OF INTENT
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
9. TECHNICAL REPORT
Provide a complete technical report with all the information required in Attachment D of this General Order.
10. FILING FEE
Pursuant to California Water Code section 13260 et seq., Dischargers enrolled under this General Order are required to pay an annual fee, as determined by the State Water Resources Control Board. The filing fee accompanying this NOI is the first year’s annual fee. The annual fee is based on the threat to water quality and complexity of the discharge in accordance with California Code of Regulations, title 23, section 2200. Dischargers enrolled under this General Order will be assigned a threat to water quality and complexity rating as described in the General Order and will be assessed the corresponding fee, plus any applicable surcharges. The NOI is to be accompanied by a check, made out to the State Water Resources Control Board for the payment of the filing fee.
11. CERTIFICATION
“I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.” Signature (Owner or Authorized Representative) Date
Print Name Title
Telephone Number Email
August 4, 2015 C-3
THIS PAGE INTENTIONALLY LEFT BLANK
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
The technical report required as part of the Notice of Intent (NOI) to comply with the terms of this General Order must be organized such that each item listed below is addressed in the same format, including the numbering scheme. The entire General Order should be thoroughly reviewed for its requirements prior to preparation of this technical report. The minimum information needed to provide a complete review of your application by the appropriate Regional Water Board is listed below. This list may not reference all information needed for every composting operation.
The Business and Professions Code sections 6735, 7835, and 7835.1 require that engineering and geologic evaluations and judgments be performed by or under the direction of licensed professionals. Any plan or report submitted in compliance with the requirements of this General Order, which requires technical interpretation, or proposes either a design, or a design change that might affect the composting operation’s containment features, detention ponds, or monitoring systems must be prepared by, or under the direction of, appropriately licensed professionals (e.g., registered civil engineer, professional geologist, or other registered certified specialty geologist) by the State of California. In addition, the licensee must sign and provide his or her registration number, and/or stamp the submitted plan or report.
A. GENERAL INFORMATION
1. Property owner’s contact information including business name, main point of contact, address, telephone number, facsimile number, email address, and type of ownership (e.g., individual, corporation, etc.).
2. Operator’s contact information including business name, main point of contact, address, telephone number, facsimile number, and email address.
3. Information including name, address, telephone number, facsimile number, and email address where legal notices may be served (if different than above).
4. Legal business name and location of composting operation. Use the most accurate location, which may include: address; nearest town; cross streets; and latitude and longitude1
.
5. Description of the Facility including:
a. Assessor’s Parcel Number(s);
b. Legal description including Section, Township, and Range; c. Total Operational Footprint (acres) including ancillary activities; d. Permitted Operational Capacity expressed in cubic yards of all materials received, processed, and stored on site at any given time;
1 In accordance with GeoTracker’s Survey XYZ, Well Data, and Site Map Guidelines & Restrictions available at:
http://www.waterboards.ca.gov/ust/electronic_submittal/docs/geotrackersurvey_xyz_4_14_05.pdf D-1
August 4, 2015
ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS e. Land uses within one mile from the perimeter of the operation; and f. Description of water supply.
6. Provide a detailed site map showing the following:
a. Location and size (in acres) of the working surface used for the storage of incoming feedstocks, additives, and amendments (receiving area); b. Location and size (in acres) of the working surface used for active and curing composting;
c. Location and size (in acres) of the working surface used for the storage of final product;
d. Drainage pattern;
e. Berms and ditches for the conveyance of wastewaters; f. Location, size (in acres), and capacity (in acre feet) of all detention ponds, if applicable;
g. Location of all sampling points for the monitoring of wastewater contained within ponds pursuant to the requirements of the General Order, if applicable; h. Location of all sampling points for the monitoring of storm water runoff under the Industrial General Storm Water Permit, if applicable; and i. Location of any groundwater monitoring wells and water supply wells within and/or near the property boundary.
7. Provide background information on the composting operation including history and a description of methods and operation used including the following:
a. Describe the feedstock types, volumes, sources, and suppliers. b. Describe the additives used, sources, suppliers, and the maximum dry weight percentage used in the active composting process.
c. Describe the amendments used, sources and suppliers in the final product. d. Describe the method of composting (e.g., windrow, static, forced air, mechanical). e. Provide process flow diagram showing movement of the material from received to final product. Include average amount of time the material remains in each part of the process.
f. Describe how residuals are removed from the feedstocks managed and/or disposed.
B. SITE CONDITION INFORMATION
1. Climatology — Calculate required climatologic values from measurements made at a nearby climatologically similar station and provide the source data from which such values were calculated, together with the name, location, and period of record of the measuring station.
a. Maximum, minimum, and average annual precipitation in inches/year; b. Mean evaporation in inches/year;
D-2
August 4, 2015
ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. 25-year, 24-hour design storm event.
2. Geology:
a. Map and Cross Sections — A comprehensive geologic map and geologic cross sections showing lithology and structural features.
b. Materials — A description of natural geologic materials in and underlying the location of the operations, including identification of lithology, distribution and dimension features, physical characteristics, special physical or chemical features (i.e., alteration other than weathering), susceptibility to natural surface/near-surface processes, and all other pertinent lithologic data, all in accordance with current industry practices.
3. Hydrogeology, including:
a. General – An evaluation of water bearing characteristics of natural geologic materials identified under Geology above, including hydraulic conductivity and delineation of groundwater zones.
b. Hydraulic Conductivity – An evaluation of the in-place hydraulic conductivity of soils immediately under the operation. For Tier I facilities, this would be substituted by the soil percolation test. This evaluation includes:
1) Hydraulic conductivity in tabular form, for selected locations within the boundary of the operations;
2) A map of the operations showing test locations; and
3) An evaluation of the test procedures and rationale used to obtain the data. c. Groundwater Flow Direction and Depth – an evaluation of the groundwater flow velocity and direction(s) within the uppermost groundwater zone and the following conditions:
1) Maximum and average depth to first encountered groundwater below the native ground surface (in feet) and identify the source of the information; and 2) Maximum and average groundwater elevation of first encountered groundwater (in feet) relative to mean sea level.
4. Discuss the location and distance (in feet) to the nearest water supply wells (e.g., municipal supply, domestic supply, agricultural wells) from the nearest property boundary of the operation.
5. Discuss whether the operation is located within a 100-year flood plain based on the Federal Emergency Management Agency’s (FEMA) designation and any design features to prevent inundation of the feedstocks, additives, amendments, compost (active, curing, or final product), or detention ponds. Include a reference to the appropriate FEMA Flood Hazard Map. Operations located within a 100-year floodplain may be subject to state and/or local land use restrictions and permits.
D-3
August 4, 2015
ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
6. Identify all nearby surface water bodies, including streams, ditches, canals, and other drainage courses. Provide distances from the nearest property boundary of the operation to these areas on a map.
C. DESIGN INFORMATION
1. Provide the current and/or proposed design of all working surfaces, berms, and conveyance ditches for the storage and/or treatment of feedstocks, additives, amendments, and compost (active, curing, or final product), along with information demonstrating that these containment structures comply with appropriate design specifications of this General Order. Submit for each operational area detailed preliminary and/or (if existing, or later upon completion) as-built plans, specifications, and descriptions for all working surfaces or other containment structures and drainage/conveyance systems. In addition, the report shall contain a description of, and location data for, ancillary facilities including roads, waste handling areas, detention ponds, buildings, and equipment cleaning facilities.
2. Provide a Water and Wastewater Management Plan describing how water and wastewaters will be managed in accordance with this General Order. Information must include a description of and/or plan illustrating all precipitation controls, containment structures, (i.e., conveyance systems for wastewater and detention ponds), best management practices, and contingency plan including:
a. A wastewater conveyance system for controlling run-on and runoff from the working surface.
b. A description of how water and wastewater is obtained and used in the compost process.
c. A description of how the operation collects and manages wastewater. Information may include, but is not limited to, quantity that is reused back into the process, description of wastewater treatment systems, other water quality permits, and best management practices (i.e. covering materials) that reduce the production of wastewater.
d. If using a detention pond, provide a water balance demonstrating compliance with the Design, Construction and Operation Requirements section of this General Order.
D. OPERATIONS AND MONITORING INFORMATION
1. Include a proposal for an annual survey of the operation prior to the rainy season to assure that the site has been graded and prepared for the rainy season to eliminate and minimize erosion and ponding, in compliance with the requirements of this General Order.
2. Describe the inspection and maintenance program that will be undertaken regularly during composting operations, such as inspection of the containment structures for evidence of leachate, ponding, or surface failures such as cracking, spilling, or subsidence, in compliance with the specifications of this General Order.
D-4
August 4, 2015
ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS
3. Describe the means by which the composting operation will be conducted in a manner that does not cause, threaten to cause, or contribute to conditions of contamination, pollution, or nuisance.
4. Provide a description of the operations during periods of wet weather to ensure integrity of the containment systems.
5. For Dischargers proposing groundwater protection monitoring in lieu of the design specifications, include a Groundwater Protection Monitoring Plan for establishing, operating, and monitoring to verify groundwater has not been impacted by the composting operation. Include rationale for the type of monitoring, monitoring frequency, spatial distribution of monitoring points, selection of monitoring equipment, construction specifications, procedures for sampling, analysis of the data, and data evaluation. This plan must include the following:
a. Map – a map showing the locations of the proposed monitoring system; b. Plans and Specifications – drawings and data showing construction details of the proposed monitoring system.
c. Inspection Procedures – construction quality assurance plan to ensure the system will be constructed per approved plans.
d. Sampling and Analysis – the plan shall include consistent sampling and analytical procedures that are designed to ensure that monitoring results provide a reliable indication of water quality at all monitoring points. At a minimum, the plan shall include a detailed description of the procedures and techniques for:
1) Sample collection (i.e. container types), sampling equipment (i.e. field instruments, pumps, bailers, etc.), equipment calibration, and decontamination of sampling equipment;
2) Sample preservation and shipment;
3) Analytical procedures;
4) Chain of custody control; and
5) QA/QC procedures.
e. Proposed Data Analysis Method – describe the methods that will be used in evaluating protection of water quality. The specifications for each data analysis method shall include a list of constituents of concern that will be monitored and a detailed description of the criteria to be used for determining “measurably significant” evidence of any release from the operation and for determining compliance.
E. SITE CLOSURE INFORMATION
The technical report must include a plan for site closure activities upon completion of operations under this General Order to protect public health, safety, and the environment. The plan must describe how the site will be restored in compliance with the Site Closure Requirements section of this General Order.
D-5
August 4, 2015
ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ
GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS F. COMPLIANCE SCHEDULE (EXISTING FACILITIES)
The technical report shall include a proposed schedule for achieving compliance with this General Order. Proposed schedules for implementation of the identified collection, control, and monitoring practices must be as soon as practicable, supported with appropriate technical or economic justification and in no case may the schedule exceed six years from the date of the NOI. The Regional Water Board may modify the schedules based on evidence that meeting the compliance date is technically or economically infeasible.
D-6
August 4, 2015
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX R SIGNIFICANT INDUSTRIAL USERS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN R-1
The following data and worksheet was compiled to corroborate the 0.6 sewer to factor ratio shown in Table 5.7 - Sewer to Water Usage Factors With 2020 Water Consumption Data. This corroboration occurs by comparing sewer to water flows from the metered pipelines to and from each significant industrial user (SIU), and developing a ratio between the two.
There are eight SIUs that the City of Santa Maria (City) tracks for water and sewer flows. However, there are some issues with meters. For example, Mission Linen Company, an SIU, produces a higher sewer flow than what is metered. Further, there are two SIUs that are "zero dischargers" and produce cooling water with zero loading to the sewer. As a result, the three SIUs that do not produce water flows are excluded from the following data.
To account for gaps in data, 2021 through 2023 data has been compiled and averaged.
Table R.1 SIUs Tracked by the City
SIU Average Wastewater Discharge
(gallons)
Average Water Consumption
(gallons)
Sewer to Water Factor
Fess Parker Winery 83,000 331,800 0.25
Fresh Venture Foods 3,280,000 3,620,000 0.91
Titan Frozen Fruits 4,460,000 5,360,000 0.81
Miller Family Wine Company 133,000 308,000 0.44
Okonite 940,000 1,530,000 0.61
Mission Linen Supply(1) 1,880,000 1,485,000 1.28(1)
PictSweet(2) - 265,000 -
SureFresh Produce(3) 4,220,000 - -
Average - - 0.60
Notes:
(1) Provided SIU data indicates that Mission Linen Supply produces more wastewater than it consumes. This may indicate a metering issue. For analysis, the sewer to water factor was not included in the final average. (2) PictSweet does not discharge wastewater.
(3) SureFresh Produce has two processing plants. The values provided are the sum of both.
The value of 0.60 has been used to maintain the proportion of industrial flows in the City's wastewater.
The effect of this is that it serves as a projection of an increased industrial flows as a proportion of the net flow into the plant.
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX S PERCOLATION PONDS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN S-1
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX T AACE INTERNATIONAL RECOMMENDED
PRACTICE NO. 18R-97
18R-97
COST ESTIMATE CLASSIFICATION
SYSTEM - AS APPLIED IN
ENGINEERING, PROCUREMENT,
AND CONSTRUCTION FOR THE
PROCESS INDUSTRIES
SAMPLE
Copyright © AACE®
International AACE®International Recommended Practices
Single user license only. Copying and networking prohibited.
This document is copyrighted by AACE International and may not be reproduced without permission. Organizations may obtain permission to reproduce a limited number of copies by entering into a license agreement. For information please contact [email protected] AACE International Recommended Practice No. 18R-97
COST ESTIMATE CLASSIFICATION SYSTEM –
AS APPLIED IN ENGINEERING, PROCUREMENT, AND
CONSTRUCTION FOR THE PROCESS INDUSTRIES
TCM Framework: 7.3 – Cost Estimating and Budgeting
Rev. March 6, 2019
Note: As AACE International Recommended Practices evolve over time, please refer to web.aacei.org for the latest revisions.
Any terms found in AACE Recommended Practice 10S-90, Cost Engineering Terminology, supersede terms defined in other AACE work products, including but not limited to, other recommended practices, the Total Cost Management Framework, and Skills & Knowledge of Cost Engineering.
Contributors:
Disclaimer: The content provided by the contributors to this recommended practice is their own and does not necessarily reflect that of their employers, unless otherwise stated.
March 6, 2019 Revision:
Peter R. Bredehoeft, Jr. CEP FAACE (Primary Contributor) Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life
(Primary Contributor)
John K. Hollmann, CCP CEP DRMP FAACE Hon. Life
(Primary Contributor)
March 1, 2016 Revision:
Larry R. Dysert, CCP CEP DRMP
(Primary Contributor)
Laurie S. Bowman, CCP DRMP EVP PSP
Peter R. Bredehoeft, Jr. CEP
Dan Melamed, CCP EVP
Todd W. Pickett, CCP CEP
Richard C. Plumery, EVP
November 29, 2011 Revision:
Peter Christensen, CCE (Primary Contributor)
Larry R. Dysert, CCC CEP (Primary Contributor)
Jennifer Bates, CCE
Jeffery J. Borowicz, CCE CEP PSP
Peter R. Bredehoeft, Jr. CEP
Robert B. Brown, PE
Dorothy J. Burton
Robert C. Creese, PE CCE
John K. Hollmann, PE CCE CEP
Kenneth K. Humphreys, PE CCE
Donald F. McDonald, Jr. PE CCE PSP
C. Arthur Miller
Todd W. Pickett, CCC CEP
Bernard A. Pietlock, CCC CEP
Wesley R. Querns, CCE
Don L. Short, II CEP
H. Lance Stephenson, CCC
James D. Whiteside, II PE
SAMPLE
AACE®
International Recommended Practice No. 18R-97
COST ESTIMATE CLASSIFICATION SYSTEM – AS
APPLIED IN ENGINEERING, PROCUREMENT, AND
CONSTRUCTION FOR THE PROCESS INDUSTRIES
TCM Framework: 7.3 – Cost Estimating and Budgeting
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited.
TABLE OF CONTENTS
Table of Contents ..........................................................................................................................................................1 Purpose..........................................................................................................................................................................1 Introduction...................................................................................................................................................................2 Cost Estimate Classification Matrix for the Process Industries .....................................................................................2 Determination of the Cost Estimate Class.....................................................................................................................5 Characteristics of the Estimate Classes .........................................................................................................................6 Estimate Input Checklist and Maturity Matrix.............................................................................................................12 Basis of Estimate Documentation................................................................................................................................14 Project Definition Rating System.................................................................................................................................14 References...................................................................................................................................................................14 Contributors.................................................................................................................................................................15
PURPOSE
As a recommended practice (RP) of AACE International, the Cost Estimate Classification System provides guidelines for applying the general principles of estimate classification to project cost estimates (i.e., cost estimates that are used to evaluate, approve, and/or fund projects). The Cost Estimate Classification System maps the phases and stages of project cost estimating together with a generic project scope definition maturity and quality matrix, which can be applied across a wide variety of industries and scope content.
This recommended practice provides guidelines for applying the principles of estimate classification specifically to project estimates for engineering, procurement, and construction (EPC) work for the process industries. It supplements the generic cost estimate classification RP 17R-97[1] by providing:
• A section that further defines classification concepts as they apply to the process industries. • A chart that maps the extent and maturity of estimate input information (project definition deliverables) against the class of estimate.
As with the generic RP, the intent of this document is to improve communications among all the stakeholders involved with preparing, evaluating, and using project cost estimates specifically for the process industries.
The overall purpose of this recommended practice is to provide the process industry with a project definition deliverable maturity matrix that is not provided in 17R-97. It also provides an approximate representation of the relationship of specific design input data and design deliverable maturity to the estimate accuracy and methodology used to produce the cost estimate. The estimate accuracy range is driven by many other variables and risks, so the maturity and quality of the scope definition available at the time of the estimate is not the sole determinate of accuracy; risk analysis is required for that purpose.
This document is intended to provide a guideline, not a standard. It is understood that each enterprise may have its own project and estimating processes, terminology, and may classify estimates in other ways. This guideline SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
2 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited. provides a generic and generally acceptable classification system for the process industries that can be used as a basis to compare against. This recommended practice should allow each user to better assess, define, and communicate their own processes and standards in the light of generally-accepted cost engineering practice.
INTRODUCTION
For the purposes of this document, the term process industries is assumed to include firms involved with the manufacturing and production of chemicals, petrochemicals, and hydrocarbon processing. The common thread among these industries (for the purpose of estimate classification) is their reliance on process flow diagrams (PFDs), piping and instrument diagrams (P&IDs), and electrical one-line drawings as primary scope defining documents. These documents are key deliverables in determining the degree of project definition, and thus the extent and maturity of estimate input information. This RP applies to a variety of project delivery methods such as traditional design-bid-build (DBB), design-build (DB), construction management for fee (CM-fee), construction management at risk (CM-at risk), and private-public partnerships (PPP) contracting methods.
Estimates for process facilities center on mechanical and chemical process equipment, and they have significant amounts of piping, instrumentation, and process controls involved. As such, this recommended practice may apply to portions of other industries, such as pharmaceutical, utility, water treatment, metallurgical, converting, and similar industries.
Most plants also have significant electrical power equipment (e.g., transformers, switchgear, etc.) associated with them. As such, this RP also applies to electrical substation projects, either associated with the process plant, as part of power transmission or distribution infrastructure, or supporting the power needs of other facilities. This RP excludes power generating facilities and high-voltage transmission.
This RP specifically does not address cost estimate classification in non-process industries such as commercial building construction, environmental remediation, transportation infrastructure, hydropower, “dry” processes such as assembly and manufacturing, “soft asset” production such as software development, and similar industries. It also does not specifically address estimates for the exploration, production, or transportation of mining or hydrocarbon materials, although it may apply to some of the intermediate processing steps in these systems.
The cost estimates covered by this RP are for engineering, procurement, and construction (EPC) work only. It does not cover estimates for the products manufactured by the process facilities, or for research and development work in support of the process industries. This guideline does not cover the significant building construction that may be a part of process plants.
This guideline reflects generally-accepted cost engineering practices. This recommended practice was based upon the practices of a wide range of companies in the process industries from around the world, as well as published references and standards. Company and public standards were solicited and reviewed, and the practices were found to have significant commonalities. [4,5,6,7] These classifications are also supported by empirical process industry research of systemic risks and their correlation with cost growth and schedule slip [8].
COST ESTIMATE CLASSIFICATION MATRIX FOR THE PROCESS INDUSTRIES A purpose of cost estimate classification is to align the estimating process with project stage-gate scope development and decision-making processes.
SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
3 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited.
Table 1 provides a summary of the characteristics of the five estimate classes. The maturity level of project definition is the sole determining (i.e., primary) characteristic of class. In Table 1, the maturity is roughly indicated by a percentage of complete definition; however, it is the maturity of the defining deliverables that is the determinant, not the percent. The specific deliverables, and their maturity or status are provided in Table 3. The other characteristics are secondary and are generally correlated with the maturity level of project definition deliverables, as discussed in the generic RP [1]. The post sanction classes (Class 1 and 2) are only indirectly covered where new funding is indicated. Again, the characteristics are typical but may vary depending on the circumstances.
Primary Characteristic Secondary Characteristic
ESTIMATE
CLASS
MATURITY LEVEL OF
PROJECT DEFINITION
DELIVERABLES
Expressed as % of complete
definition
END USAGE
Typical purpose of
estimate
METHODOLOGY
Typical estimating method
EXPECTED ACCURACY
RANGE
Typical variation in low and high
ranges at an 80% confidence
interval
Class 5 0% to 2% Concept
screening
Capacity factored,
parametric models,
judgment, or analogy
L: -20% to -50%
H: +30% to +100%
Class 4 1% to 15% Study or
feasibility
Equipment factored or
parametric models
L: -15% to -30%
H: +20% to +50%
Class 3 10% to 40%
Budget
authorization or
control
Semi-detailed unit costs
with assembly level line
items
L: -10% to -20%
H: +10% to +30%
Class 2 30% to 75% Control or
bid/tender
Detailed unit cost with
forced detailed take-off
L: -5% to -15%
H: +5% to +20%
Class 1 65% to 100% Check estimate
or bid/tender
Detailed unit cost with
detailed take-off
L: -3% to -10%
H: +3% to +15%
Table 1 – Cost Estimate Classification Matrix for Process Industries This matrix and guideline outline an estimate classification system that is specific to the process industries. Refer to Recommended Practice 17R-97 [1] for a general matrix that is non-industry specific, or to other cost estimate classification RPs for guidelines that will provide more detailed information for application in other specific industries. These will provide additional information, particularly the Estimate Input Checklist and Maturity Matrix which determines the class in those industries. See Professional Guidance Document 01, Guide to Cost Estimate Classification. [16]
Table 1 illustrates typical ranges of accuracy ranges that are associated with the process industries. The +/- value represents typical percentage variation at an 80% confidence interval of actual costs from the cost estimate after application of appropriate contingency (typically to achieve a 50% probability of project cost overrun versus underrun) for given scope. Depending on the technical and project deliverables (and other variables) and risks associated with each estimate, the accuracy range for any particular estimate is expected to fall into the ranges identified. However, this does not preclude a specific actual project result from falling outside of the indicated range of ranges identified in Table 1. In fact, research indicates that for weak project systems and complex or otherwise risky projects, the high ranges may be two to three times the high range indicated in Table 1. [17] In addition to the degree of project definition, estimate accuracy is also driven by other systemic risks such as:
• Level of familiarity with technology.
• Unique/remote nature of project locations and conditions and the availability of reference data for those.
SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
4 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited. • Complexity of the project and its execution.
• Quality of reference cost estimating data.
• Quality of assumptions used in preparing the estimate. • Experience and skill level of the estimator.
• Estimating techniques employed.
• Time and level of effort budgeted to prepare the estimate. • Market and pricing conditions.
• Currency exchange.
• The accuracy of the composition of the input and output process streams.
Systemic risks such as these are often the primary driver of accuracy, especially during the early stages of project definition. As project definition progresses, project‐specific risks (e.g. risk events and conditions) become more prevalent and also drive the accuracy range. Another concern in estimates is potential organizational pressure for a predetermined value that may result in a biased estimate. The goal should be to have an unbiased and objective estimate both for the base cost and for contingency. The stated estimate ranges are dependent on this premise and a realistic view of the project. Failure to appropriately address systemic risks (e.g. technical complexity) during the risk analysis process, impacts the resulting probability distribution of the estimated costs, and therefore the interpretation of estimate accuracy.
Figure 1 illustrates the general relationship trend between estimate accuracy and the estimate classes (corresponding with the maturity level of project definition). Depending upon the technical complexity of the project, the availability of appropriate cost reference information, the degree of project definition, and the inclusion of appropriate contingency determination, a typical Class 5 estimate for a process industry project may have an accuracy range as broad as -50% to +100%, or as narrow as -20% to +30%. However, note that this is dependent upon the contingency included in the estimate appropriately quantifying the uncertainty and risks associated with the cost estimate. Refer to Table 1 for the accuracy ranges conceptually illustrated in Figure 1. [18] Figure 1 also illustrates that the estimating accuracy ranges overlap the estimate classes. There are cases where a Class 5 estimate for a particular project may be as accurate as a Class 3 estimate for a different project. For example, similar accuracy ranges may occur if the Class 5 estimate of one project that is based on a repeat project with good cost history and data and, whereas the Class 3 estimate for another is for a project involving new technology. It is for this reason that Table 1 provides ranges of accuracy values. This allows consideration of the specific circumstances inherent in a project and an industry sector to provide realistic estimate class accuracy range percentages. While a target range may be expected for a particular estimate, the accuracy range should always be determined through risk analysis of the specific project and should never be pre-determined. AACE has recommended practices that address contingency determination and risk analysis methods. [19] If contingency has been addressed appropriately approximately 80% of projects should fall within the ranges shown in Figure 1. However, this does not preclude a specific actual project result from falling inside or outside of the indicated range of ranges identified in Table 1. As previously mentioned, research indicates that for weak project systems, and/or complex or otherwise risky projects, the high ranges may be two to three times the high range indicated in Table 1.
SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
5 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited.
Figure 1 – Illustration of the Variability in Accuracy Ranges for Process Industry Estimates
DETERMINATION OF THE COST ESTIMATE CLASS
For a given project, the determination of the estimate class is based upon the maturity level of project definition based on the status of specific key planning and design deliverables. The percent design completion may be correlated with the status, but the percentage should not be used as the class determinate. While the determination of the status (and hence the estimate class) is somewhat subjective, having standards for the design input data, completeness and quality of the design deliverables will serve to make the determination more objective.
SAMPLE
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 3: Wastewater Characterization
and Process Modeling
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 3: Wastewater Characterization
and Process Modeling
FINAL / October 2026
Digitally signed by Andre Gharagozian
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.27 10:09:04-07'00'
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 3/Ch01 Contents
CHAPTER 1 WASTEWATER CHARACTERIZATION AND PROCESS
MODELING
1.1 Purpose and Key Findings 1-1
1.2 Flow and Load Summary 1-2
1.3 Existing Facilities Description 1-9
1.4 Performance and Capacity Evaluation 1-11
1.4.1 Permit Limits 1-11
1.4.2 Historical Performance 1-13
1.4.3 Effluent Nitrogen 1-14
1.4.4 Wastewater Sampling and Characterization 1-15
1.4.5 Unit Process Evaluation 1-18
1.5 Process Modeling - Existing Facilities 1-32
1.6 Capacity Evaluation 1-37
Appendices
APPENDIX A TM 1: EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR
NEAR-TERM EFFLUENT QUALITY IMPROVEMENT
APPENDIX B SUPPLEMENTAL SAMPLING PLAN
Tables
Table 1.1 Historical Influent Flow and Peaking Factor Data 1-2 Table 1.2 Historical Influent Concentrations(1) 1-4
Table 1.3 Historical Influent Loadings 1-4
Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) 1-11 Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 1-12
Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 1-12
Table 1.7 Summary of Historical Performance Through December 2024 1-13 Table 1.8 Summary of Wastewater Sampling Plan Data 1-17 Table 1.9 Unit Process Performance 1-19
Table 1.10 Process Model Calibration Parameters 1-34
Table 1.11 Process Model Calibration Summary 1-35
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Figures
Figure 1.1 Historical Influent Flow 1-3
Figure 1.2 Historical Influent CBOD and BOD5 Concentrations 1-5 Figure 1.3 Historical Influent TSS Concentrations 1-6
Figure 1.4 Historical Influent CBOD and BOD5 Loadings 1-7 Figure 1.5 Historical Influent TSS Loadings 1-8
Figure 1.6 Historical Influent TKN and NH3-N Concentrations 1-8 Figure 1.7 Process Flow Diagram 1-10
Figure 1.8 Effluent TSS and CBOD 1-14
Figure 1.9 Effluent Ammonia, Nitrate, and Nitrite 1-15
Figure 1.10 SORs for Primary Clarifiers 1-23
Figure 1.11 Thickened Sludge Flow Rate 1-26
Figure 1.12 Thickened Sludge TS Concentration 1-26
Figure 1.13 Anaerobic Digester Hydraulic Retention Time 1-27 Figure 1.14 Anaerobic Digester VS Loading Rate 1-28
Figure 1.15 Anaerobic Digester pH 1-29
Figure 1.16 Anaerobic Digester Volatile Acids 1-29
Figure 1.17 Anaerobic Digester Alkalinity 1-30
Figure 1.18 Anaerobic Digester Gas Production 1-30
Figure 1.19 Anaerobic Digester Temperature 1-31
Figure 1.20 Anaerobic Digester VS Reduction 1-31
Figure 1.21 Anaerobic Digester Volatile Acids/Alkalinity Ratio 1-32 Figure 1.22 Process Model for City's WWTP 1-33
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AA annual average
BOD5 5-day biochemical oxygen demand test
CaCO3 calcium carbonate
Carollo Carollo Engineers
CBOD carbonaceous biochemical oxygen demand
City City of Santa Maria
COD chemical oxygen demand
ft2 square feet
ft3 cubic feet
gpd gallons per day
gpm gallons per minute
HRT hydraulic residence time
klb thousand pounds
lb pound
mg/L milligrams per liter
mgd million gallons per day
mL/L milliliters per liter
MM maximum month
mm millimeter
NH3-N ammonia
NO2-N nitrite
NO3-N nitrate
NOA Notice of Applicability
O&M operations and maintenance
PH peak hour
PTFPS primary trickling filter pump station
PTF primary trickling filter
RWQCB Regional Water Quality Control Board
SK Spulkraft
SOR surface overflow rate
STFPS secondary trickling filter pump station
STFs secondary trickling filters
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TM technical memorandum
TN total nitrogen
TS total solids
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
TSCP Time Schedule Compliance Plan
TSS total suspended solids
VS volatile solids
VSS volatile suspended solids
WDR waste discharge requirements
WWTP wastewater treatment plant
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 WASTEWATER CHARACTERIZATION AND
PROCESS MODELING
1.1 Purpose and Key Findings
The purpose of this chapter is to summarize the wastewater characterization sampling event performed at the City of Santa Maria's (City's) Wastewater Treatment Plant (WWTP) and process modeling for the existing facilities. The wastewater characterization sampling event was recommended by Carollo Engineers to supplement the routinely collected operating data and help calibrate the process model, which was leveraged to evaluate current WWTP's performance, establish unit process capacity, and develop near term recommendations for improving plant performance. These recommendations were summarized in draft Technical Memorandum (TM) 1, which is included in Appendix A for reference. This chapter builds on the contents of TM 1 and also provides a review of historical wastewater influent and performance data. Findings from this chapter will also be used to help evaluate alternatives for future facilities to meet the new General Permit and anticipated future effluent quality discharge limits.
Key findings from wastewater characterization, historical performance, and capacity evaluation include:
The influent carbonaceous biochemical oxygen demand (CBOD), total suspended solids (TSS), total Kjeldahl nitrogen (TKN), and ammonia (NH3-N) concentrations during the sampling event were lower than the average historical data. This could likely be due to two possible reasons:
» The WWTP experienced lower incoming loads during the sampling event. » The influent samples were collected as flow-based composites during the sampling event; however, historically, the influent samples have been collected as time-based composites. The TSS concentrations in solids streams such as thickener underflow, digested sludge, and solids off hauled were also lower than the average historical data. This could again possibly be due to the lower incoming loads into the WWTP during the sampling event. The average influent chemical oxygen demand (COD) to 5-day biochemical oxygen demand test (BOD5) ratio is about 2.6, which is higher than the typical range of 1.8 to 2.2 for municipal wastewater.
The average particulate COD to volatile suspended solids (VSS) is about 2.0 which is high end of the typical range of 1.4 to 2.0. These higher than typical ratios suggest the presence of industrial waste streams or other non-municipal components in the influent. The primary treatment performance including primary clarifiers and primary trickling filters (PTFs) is well within the typical range for the current loading.
The secondary trickling filters (STFs) are performing below the typical range based on the current organic loading.
The solids handling treatment system including digesters, gravity thickeners, and sludge drying beds are performing well within the typical range.
The CBOD and TSS loadings are close to the design average conditions, implying that the secondary treatment process is at capacity.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
1.2 Flow and Load Summary
Table 1.1 summarizes the historical influent flow data for the City's WWTP including annual average (AA), maximum month (MM), and peak hour (PH) flows from January 2018 through December 2024. The "design" values in the right-hand column show the design criteria taken from the most recent 2008 plant expansion project. Although the plant AA flow over the past seven years is 7.1 million gallons per day (mgd) compared with the design flow of 12.5 mgd, the organic loading rates (discussed later) are relatively high. Note that the influent flowmeter was recalibrated in September 2023, which accounts for the change in the AA and MM flow values between 2023 and 2024 shown in Table 1.1. More details are provided in Volume 7, Chapter 2.
Table 1.1 Historical Influent Flow and Peaking Factor Data Flow 2018 2019 2020 2021 2022 2023 2024 Average Design
AA, mgd 7.4 6.8 7.3 7.0 7.3 7.7(1) 6.6 7.1 12.5
MM, mgd 8.5 7.3 7.9 7.5 8.0 8.6(1) 6.9 7.8 13.5
MM Peaking Factor (i.e., MM/AA Flow) 1.15 1.07 1.08 1.07 1.10 1.08 1.05 1.10 1.08 PH, mgd -- 12.9 18.2 12.6 13.3 17.1 -- 14.8(2) 24
PH Peaking Factor (i.e., PH/AA Flow) -- 1.90 2.49 1.80 1.82 2.23 -- 2.05(2) 1.9 Notes:
(1) Influent flowmeter recalibrated in September 2023.
(2) Average data from 2019 through 2023 only.
Figure 1.1 shows the average influent flow to the WWTP for the evaluation period. The solid black line represents the 30-day running average, which can be compared to the design MM flow. As seen in Figure 1.1, the average influent flow since 2018 has been fluctuating between 6 to 8.5 mgd and showed a slight increasing trend between 2020 and 2023, and then a decreasing trend over the last couple of years.
In general, influent flows are less than the design capacity, and MM and PH peaking factors are close to the original design basis.
The City regularly collects and analyzes 24-hour time-based (sampled every 20 minutes) composite samples of their influent just downstream of the bar screens. The CBOD and TSS were sampled biweekly, while influent nitrogen species are measured quarterly. Table 1.2 presents the historical concentration data, and Table 1.3 summarizes the average and MM historical loads of key constituents such as CBOD, TSS, TKN, and NH3-N. The MM concentrations are calculated using MM loads and AA flow.
As shown in Table 1.2, the average annual CBOD over the last six years was 405 milligrams per liter (mg/L).
The CBOD test includes the use of a nitrifier inhibitor, which is known to also inhibit heterotrophic organisms that exert carbonaceous demands. The sampling event showed the average CBOD/BOD5 ratio was 0.83, which means the average annual CBOD corresponds to a BOD5 concentration of around 498 mg/L. The calculated AA BOD5 concentration is 57 percent higher than the design value of 317 mg/L.
Historically, the City has tested for CBOD; however, starting October 2023, City switched to testing and reporting BOD5. The average BOD5 concentration from October 2023 to December 2024 was about 491 mg/L which is 55 percent higher than the design value of 317 mg/L. So, although the current average influent flows are only about 64 percent of the design value, the influent BOD5 load is about 83 percent of the design value. Similarly, for TSS, the influent loads are currently more than 70 percent of the design value.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
The NH3-N and TKN values are close to the higher end of the typical range for domestic wastewater. The typical range for TKN is 40 to 80 mg/L.
Figure 1.1 Historical Influent Flow
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Table 1.2 Historical Influent Concentrations(1)
Constituent 2018 2019 2020 2021 2022 2023 2024 Average Design CBOD
AA, mg/L 410 411 413 380 407 412(2) -- 405 263(4)
MM(3), mg/L 469 453 527 450 496 521(2) -- 486 287(4)
BOD
AA, mg/L -- -- -- -- -- 504(5) 478 491 317
MM(3), mg/L -- -- -- -- -- --(6) 670 670 346
TSS
AA, mg/L 395 417 377 401 374 391 414 396 323
MM(3), mg/L 474 464 501 457 425 513 507 472 382
TKN
AA, mg/L 72 75 75 67 71 66 80 73 --
NH3-N
AA, mg/L 47 51 50 52 45 46 51 49 --
Notes:
(1) Samples analyzed once per week for CBOD and TSS, and quarterly for TKN and NH3-N. (2) Includes data through September only, City switched to testing for BOD5 starting October 2023. (3) Back calculated using MM loading and average flows. (4) Calculated using the BOD5 design values and an assumed CBOD to BOD5 ratio of 0.83. (5) Includes data from October through December only.
(6) Not enough data to calculate MM concentration.
Table 1.3 Historical Influent Loadings
Constituent 2018 2019 2020 2021 2022 2023 2024 Average Design CBOD
AA, klb/day 25.6 23.0 25.4 22.2 24.9 27.1(1) -- 24.7 27.4(2) MM, klb/day 28.9 25.7 32.1 26.1 30.2 33.4(1) -- 30.1 32.4(2) MM Peaking Factor (MM/AA) 1.13 1.15 1.26 1.18 1.21 1.36 -- 1.22 1.18(3) BOD
AA, klb/day -- -- -- -- -- 28.0(4) 27.0 27.5 33.0
MM, klb/day -- -- -- -- -- --(5) 37.0 37.0 39.0
MM Peaking Factor (MM/AA) -- -- -- -- -- --(5) 1.37 1.37 1.18 TSS
AA, klb/day 24.7 23.4 23.1 23.4 22.8 24.9 23.1 23.6 33.6 MM, klb/day 29.2 26.3 30.5 26.5 25.9 32.9 27.9 28.5 42.8 MM Peaking Factor (MM/AA) 1.33 1.12 1.32 1.13 1.16 1.30 1.21 1.22 1.27 Notes:
klb - thousand pounds
(1) Includes data through September only, City switched to sampling BOD5 starting October 2023. (2) Calculated using the BOD5 design values and an assumed CBOD to BOD5 ratio of 0.83. (3) Assumed same design MM peaking factor as of BOD5.
(4) Included data from October through December only.
(5) Not enough data to calculate MM loadings and peaking factor.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Figure 1.2 shows the historical average CBOD and BOD5 concentrations, and Figure 1.3 shows the TSS concentrations for the evaluation period. As seen in Figures 1.2 and 1.3, average CBOD and TSS concentrations have remained consistently in the range of 380 to 410 mg/L during the review period, which is significantly higher than the original design values. As mentioned earlier, City switched from testing for CBOD to BOD5 starting October 2023, which can be seen in Figure 1.2.
Figure 1.2 Historical Influent CBOD and BOD5 Concentrations VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Figure 1.3 Historical Influent TSS Concentrations
Figure 1.4 shows the historical average CBOD and BOD5 loadings, and Figure 1.5 shows the historical average TSS loadings at the WWTP. Although the TSS and CBOD concentrations are higher than the original design values, influent loads are still less than the design since the average influent flows are only 60 percent of the original design rating of 12.5 mgd AA flow. Both TSS and CBOD loadings have varied slightly during the review period, but the average over the period has generally been fairly constant.
Figure 1.6 shows the historical average TKN and NH3-N concentrations for the evaluation period. Average TKN and NH3-N concentrations have remained fairly consistent for the evaluation period.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
Figure 1.4 Historical Influent CBOD and BOD5 Loadings
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Figure 1.5 Historical Influent TSS Loadings
Figure 1.6 Historical Influent TKN and NH3-N Concentrations VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
1.3 Existing Facilities Description
The City's WWTP is located at 601 Black Road, Santa Maria, California 93458. The WWTP is a two-stage trickling filter plant and is designed to treat 12.5 mgd of AA flow. The existing facilities description is primarily generated from the WWTP's operations and maintenance (O&M) manual.
The influent wastewater flow is measured with a Parshall flume. The wastewater is then screened through a 0.5-inch bar screen to remove rags, sticks, and large objects that can clog pumps or damage equipment.
The screened wastewater then flows to two parallel aerated grit chambers to remove sand and grit, followed by primary clarification. At the influent end of the grit chambers, plant recycle streams (digested solids decant from the drying beds, and underflow from the secondary clarifiers and the intermediate clarifier) blend with the raw influent flow before entering the grit chambers. Immediately downstream of the grit chambers, recycle from the two PTFs mixes with the flow leaving the grit chambers. This combined stream then splits and flows to the two primary clarifiers.
The primary effluent further flows through the two-stage trickling filters including PTFs and STFs. The PTF stage includes two trickling filters with plastic media that operate in parallel. One PTF is followed by an intermediate clarifier that separates some of the solids to reduce the load on the STF system. A portion of the effluent from the PTFs is recirculated back through the primary clarifiers, as mentioned. The secondary stage includes two cross-flow, plastic media STFs that operate in parallel. The trickling filter effluent flows through the secondary clarifiers and a portion of the effluent is recirculated back to the secondary trickling filter pump station (STFPS) and the remainder is discharged to the percolation ponds.
There are a total of 15 percolation ponds of various sizes, with a total pond area of approximately 82 acres. The ponds have various percolation rates and receive flow based on which are in operation at any given time. Flow cycles between operating ponds. There are typically three or four ponds in drying mode preparing for discing and or regrading.
Settled sludge and scum from the primary clarifiers are pumped to the gravity thickeners and the thickened sludge is then pumped to the digesters. Sludge removed from the intermediate clarifier and secondary clarifiers is pumped back to the grit chambers, and ultimately removed in the primary clarifiers.
The digesters provide an anaerobic environment for the digestion of organic material. Digested sludge is dewatered in sludge drying beds where it can take several weeks or months to dry. Clear liquid, or supernatant from the beds is decanted back to the supernatant pit pump and then to the grit chambers.
Once the sludge is dried, it is removed from the sludge drying beds and trucked to a local composting facility operated by Engel and Gray. Figure 1.7 shows the process flow diagram for the City's WWTP as well as the estimated flow rates for the major process streams. Flow rates were developed based on the reported flows for the influent and thickened sludge and the design flows for the major pump stations.
This information was incorporated into a preliminary process model of the WWTP, which was used to perform a flow balance of the WWTP and estimate recycle streams. The model was developed using EnviroSim's commercially available software package, BioWin version 6.2.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
Figure 1.7 Process Flow Diagram
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
1.4 Performance and Capacity Evaluation
Data from January 2018 to September 2023 was collected and analyzed to evaluate the WWTP's performance. In addition to monitoring influent data, the routine sampling includes the following constituents at the noted frequencies below:
Effluent:
» CBOD and TSS are sampled weekly.
» NH3-N, nitrate (NO3-N), nitrite (NO2-N), TKN, and total nitrogen (TN) are sampled quarterly. » Boron, chloride, sodium, total dissolved solids (TDS), sulfate, pH, and settleable solids are sampled quarterly.
Raw sludge:
» TSS and VSS are sampled weekly.
Digested sludge:
» TSS, VSS, alkalinity, volatile acids, methane production, hydrogen sulfide, temperature, and pH are sampled weekly.
Solids hauled from the drying beds for disposal at the composting operation (wet tons).
1.4.1 Permit Limits
Please refer to Volume 2 of the Master Plan for a more detailed discussion of permitting for the City's WWTP. Until June 2023, the City was operating the treatment plant under Waste Discharge Requirement (WDR) Order No. R3-2010-000 issued by the Central Coast Regional Water Quality Control Board (RWQCB/Water Board). The 2011 treatment plant expansion allowed the City to comply with WDR Order No. R3-2010-000, the limits of which are shown in Table 1.4.
Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) Constituent Monthly Average Daily Maximum
BOD5, mg/L(1) 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
TDS(2), mg/L 1,000 --
Sodium(2), mg/L 180 --
Chloride(2), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
mL/L - milliliters per liter
(1) Although the permit states BOD5, the City had reported CBOD through September 2023. (2) Compliance shall be based on a 3-year running mean.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
In June 2023, the City received a Notice of Applicability (NOA) from the RWQCB for enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements, for discharges from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd). The NOA terminated Order No. R3-2010-000. The City has been granted Interim Effluent Limits for two years, which are shown in Table 1.5. These are the same as those shown in Table 1.3. Since September 2023, the City has been monitoring BOD5 and will no longer monitor for CBOD.
After June 16, 2025, the limits in Table 1.6 will apply. The City submitted a Time Schedule Compliance Plan (TSCP) in June 2024, which requested that the interim limits be extended until such time as the City is able to implement an upgraded treatment facility to address the TN limit. The TSCP also sets certain project milestones that the City needs to comply with, including working towards a solution to meet the Interim BOD5 limit of 60 mg/L. A copy of the TSCP is included in Volume 2 Appendix J of this Master Plan.
Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 Constituent Monthly Average Daily Maximum
BOD5, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
TDS(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
(1) Compliance shall be based on a 3-year running mean.
Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 Constituent 30-day Average 7-day Average Sample Maximum 25-month Rolling Median(1)
BOD5, mg/L 30 45 Not Applicable -
TSS, mg/L 30 45 Not Applicable -
Settleable Solids, mL/L 0.1 0.3 0.5 -
pH between 6.5 to 8.4 Not Applicable Not Applicable -
TDS, mg/L - - - 1,000
Chloride, mg/L - - - 165
Sodium, mg/L - - - 105
Sulfate, mg/L - - - 500
Boron, mg/L - - - 0.5
TN, mg/L - - - 10
Notes:
(1) Based on the Upper Guadalupe Groundwater Basin. Rolling Median is the median from all data collected over the most recent 25 months.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
1.4.2 Historical Performance
Table 1.7 provides a summary of the historical WWTP performance relative to the previous Order No. R3-2010-000 for TSS and the reported CBOD concentrations. As can be seen, the WWTP was able to treat the influent flow and remain within the CBOD and TSS monthly average limit; however, there was one exceedance for TSS in 2019 based on the daily maximum limit. The monthly average concentrations for CBOD have increased over the last few years and the City has come close to exceeding the monthly limit in 2023. The cause for the increase is not known. The monthly average concentrations for TSS have remained consistent since 2020. The data for 2024 includes BOD5 and TSS values. As shown, the plant exceeded the BOD5 limit in 2024. Figure 1.8 presents the same information compared with monthly average and daily maximum limits for both CBOD and TSS concentrations.
Table 1.7 Summary of Historical Performance Through December 2024 Constituent Effluent Limit 2018 2019 2020 2021 2022 2023 2024 CBOD, mg/L Monthly Maximum 60(2) 48.1 54.4 53.8 58.8 51.9 59.6(1) -- Daily Maximum 100(2) 63.3 72.6 57.7 88.0 59.0 79.0(1) -- BOD, mg/L(3) Monthly Maximum 60 -- -- -- -- -- -- 90.3
Daily Maximum 100 -- -- -- -- -- -- 111.0
TSS, mg/L(3) Monthly Maximum 60 49.5 59.0 45.2 48.8 44.4 57.6 42.8 Daily Maximum 100 73.0 118.0 60.4 70.2 49.2 84.8 55.0
Notes:
(1) Includes data through September only.
(2) Permit was for BOD5 limit.
(3) Interim limits for the new order.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Figure 1.8 Effluent TSS and CBOD
1.4.3 Effluent Nitrogen
The City's WWTP is a non-nitrifying two-stage trickling filter plant, therefore, nitrogen removal was not the original design intent, however it is required as part of the new General Order - see earlier discussion on TSCP. Nevertheless, removal of nitrogen to achieve the new limit of 10 milligrams TN per liter as TN will be required within the next 10 years. Therefore, it is important to assess the nitrogen constituents in the effluent.
Figure 1.9 shows the effluent NH3-N, NO3-N, and NO2-N concentrations. The average NH3-N is about 30 mg/L, NO3-N is about 4.0 mg/L, and NO2-N is about 2.0 mg/L. As seen in Figure 1.9 the higher NO3-N concentrations suggest some incidental nitrification may be occurring in the process.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
Figure 1.9 Effluent Ammonia, Nitrate, and Nitrite
1.4.4 Wastewater Sampling and Characterization
A wastewater sampling plan was developed to supplement the routinely collected data and gather additional data to for better characterization of the influent stream and the various process streams. The results from this effort were also used to calibrate a plant process model, which was leveraged to better evaluate near-term recommendations, establish unit process capacity, and further evaluate future nitrogen removal alternatives. The wastewater sampling plan was recommended for a period of one week.
City staff performed wastewater sampling from December 13 through December 19, 2023. Composite samples were collected for all liquid streams and grab samples were collected for solid streams. Since the composite samplers were not flow paced, the samples were blended manually to simulate the approximate flow characteristics. All samples were analyzed by FGL, Inc., located in San Luis Obispo.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
Table 1.8 summarizes the results from the recommended sampling plan. The wastewater sampling data collected was generally found to be consistent during the sampling period except for a few data points.
Some of the anomalies were resolved by following up with FGL, Inc. The key findings from the wastewater sampling data analysis include:
The influent CBOD and TSS concentrations during the sampling period were lower than the average historical data. This could likely be due to two possible reasons:
» The WWTP experienced lower incoming loads during the sampling period. » The influent samples were collected as flow-based composites during the sampling period, however, historically the influent samples have been collected as time-based composites. The average influent COD to BOD5 ratio is about 2.6, which is high compared to the typical range of
1.8 to 2.2 for municipal wastewater. The higher ratio suggests the presence of industrial waste streams or other non-municipal components in the influent.
The average particulate COD to VSS is about 2.0, which is the high end of the typical range of 1.4 to
2.0. The higher particulate COD to VSS also suggests the presence of industrial or other non-municipal components in the influent.
The influent TKN and NH3-N averages around 64 and 51 mg/L, respectively. This results in a NH3-N to TKN ratio of 0.81, which is a little bit higher than the typical range of 0.5 to 0.75. Additionally, the presence of NO3-N and NO2-N at STFPS and effluent suggests that some incidental nitrification is occurring in the process.
The soluble fraction for COD, BOD5, and CBOD is in the range of 55 to 60 percent which is higher than the typical range of 35 to 45 percent for municipal wastewater. The primary clarifiers seem to be performing well within the typical range. The TSS and BOD5 removal is approximately 64 and 36 percent, respectively, compared to the typical TSS and BOD5 removals of 55 to 65 percent and 25 to 35 percent, respectively.
The PTFs seem to be performing well based on the current organic loading, excluding recycle flows. » The CBOD removal is approximately 51 percent for PTF No. 1 based on the organic loading of 248 lbs BOD5/1,000 cubic feet (ft3)/day, which is higher than the typical removal of 30 percent at the same organic loading.
» The CBOD removal is approximately 55 percent for PTF No. 2 based on the organic loading of 151 lbs BOD5/1,000 ft3/day, which is higher than the typical removal of 40 percent. The intermediate clarifier provides about 13 percent TSS removal. This may just be a reflection of the relatively poor settleability of the PTF solids.
The STFs seem to be performing below typical values based on the current organic loading. The CBOD removal is approximately 60 percent for the current organic loading of 43 lbs BOD/1,000 ft3/day, which is lower than the typical removal of 70 percent at the same organic loading.
The VSS to TSS ratio was consistent for primary sludge and was approximately 90 percent. However, there was a lot of variation in the TSS and VSS data for the sampling period.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17
Table 1.8 Summary of Wastewater Sampling Plan Data
Sample Unit
Composite Samples(1)(2) Grab Samples(1)
Influent GC
Influent
Grit
Chamber
Effluent
Primary
Clarifier
Effluent
PTFPS PTF No. 1
Effluent
PTF No. 2
Effluent
Intermediate
Clarifier
Effluent
STFPS STF No. 1
Effluent
STF No. 2
Effluent Effluent Primary Sludge
Intermediate
Clarifier
Underflow
Secondary
Clarifier
Underflow
Thickener
Underflow
Thickener
Overflow Digester Drying Bed Supernatant
Solids Off-Hauled(3)
Field Measurements
Flow mgd 6.6(3)
Temperature deg C 21 18.7 34.6
pH 7.6 7.8 7.0
Gas Flow scfm 14(3)
Unfiltered
COD mg/L 915 1,001 610 390 418 382 392 326 280 201 209 165 703 1,339 BOD5 mg/L 358 146 101 66
CBOD mg/L 329 326 200 141 132 115 104 70 49 49 29 235 180 TSS mg/L 232 296 168 61 71 91 87 79 55 62 56 28 2,857 746 2,126 35,714 323 15,714 51 -- VSS mg/L 210 61 70 86 87 55 59 55 2,536 693 1,926 31,629 12,414 -- TKN mg/L 64
TP mg/L 10.8 8.7
Alkalinity mg/L
CaCO3
354 386 346 310 18,833
Filtered(3)
sCOD mg/L 491 476 323 270 287 236 222 182 113
sBOD5 mg/L 209 90 39 18
sCBOD mg/L 195 93 54 53 36 17
sTKN mg/L 53 37
Ortho-P mg/L 5.1
Filtered(4)
NH3-N mg/L 51 55 45 40
NO3-N mg/L 0.2 0.1 1.3 3.3
NO2-N mg/L 0.0 0.03 1.3 2.4
TN mg/L 54 48 43
Flocculated/Filtered(5)
ffCOD mg/L 262
Notes:
(1) Average of one-week sample period (December 13 through 19, 2023). (2) Composite samples were time-based on 13 and 14 December and flow-based from 15 to 19 December. (3) Based on routine sampling.
(4) Filtered through 1.2 - 1.5 micron glass fiber filter (the same as those typically used to measure plant TSS/VSS). Filtration should occur immediately after collection before samples are shipped. (5) Filtered through 0.45 micron Millipore filter. Filtration should occur immediately after collection before samples are shipped. Prior to filtration, filters should be triple rinsed with DI water. (6) Sample preparation per Mamais et al., 1993.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-18
The VSS to TSS ratio was also consistent for thickened sludge and was approximately 90 percent. The TSS and VSS data were mostly consistent for the sampling period except for one day (December 13, 2023).
The VSS to TSS ratio was also consistent for digested sludge and was approximately 75 percent. The TSS and VSS data were fairly consistent throughout the sampling period.
The results from the wastewater sampling exercise were used to evaluate performance and develop unit process ratings discussed in Section 1.4.5 and calibrate a process model discussed in Section 1.5.
1.4.5 Unit Process Evaluation
An understanding of the WWTP's unit process performance is critical to evaluating WWTP's capacity. The historical load and performance of each unit process was compared to the original design criteria and typical anticipated performance. The performance of each unit process provides a benchmark for the planning of new facilities and assessing capacity. Table 1.9 summarizes the results of the performance evaluation for City's WWTP based on the historical as well as additional data collected during the wastewater sampling event. The rest of this section provides a focused discussion of the operating conditions and performance for the primary, secondary, and solids handling processes.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19
Table 1.9 Unit Process Performance
Process/Parameter Original Design
Capacity or Rating Source Average Performance From 2018 - 2024 MOP 8(1) or Typical Values Recommended Operation for Performance Assessment Influent Flow
AA, mgd 12.5 O&M Manual 7.1 Variable Projections to be developed MM, mgd 13.5 O&M Manual 8.2 Variable Projections to be developed PH, mgd 24.0 O&M Manual To be developed after
receiving hourly data
Variable Projections to be developed
Primary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 379 O&M Manual 216 800 - 1,200 379 Overflow Rate at AA Flow with Recirculation, gpd/ft2 925 O&M Manual 687 800 - 1,200 925 CBOD Percent Removal 36 O&M Manual 30(2) 30 - 35 30
TSS Percent Removal 54 O&M Manual 64(2) 60 - 65 64
PTFPS
Flow Rate, mgd 19.5 O&M Manual 19.5 Variable 19.5
PTF No. 1
Flow Rate, mgd 11.7 O&M Manual 11.7 Variable 11.7
Hydraulic Loading, gpm/ft2 2.9 O&M Manual 2.9(2) 1 - 3 (Roughing)
0.3 - 1.5 (CBOD and Nitrifying)
2.9 Recirculation Ratio at AA Flow 0.67 O&M Manual 0.67 Variable, hydraulic and organic loading more critical 0.67 BOD5 Loading, lbs/1,000 ft3/day 385 w/ recycle
365 w/o recycle
O&M Manual 380(2) w/ recycle
248(2) w/o recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
248
Distributor Rotational Speed, secs/rotation 30 to 60 O&M Manual 45 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 30 to 60 Calculated based on Distributor Rotation and Flow Rate
45 Depends on BOD5 Loading, 200 to 600 mm/rotation recommended for BOD5 loading 200 lbs/1,000 ft3/day
200
Performance for BOD5 Removal, % 35 w/ recycle
55 w/o recycle
O&M Manual 13(2) w/ recycle
51(2) w/o recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
51 VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20
Process/Parameter Original Design
Capacity or Rating Source Average Performance From 2018 - 2024 MOP 8(1) or Typical Values Recommended Operation for Performance Assessment PTF No. 2
Flow Rate, mgd 7.8 O&M Manual 7.8 Variable 7.8
Hydraulic Loading, gpm/ft2 1.9 O&M Manual 1.9(2) 1 - 3 (Roughing)
0.3 - 1.5 (CBOD and Nitrifying)
1.9 Recirculation Ratio at AA Flow 1.0 O&M Manual 1.0 Variable, hydraulic and organic loading more critical 1.0 BOD5 Loading, lbs/1,000 ft3/day 255 w/ recycle
250 w/o recycle
O&M Manual 253(2) w/ recycle
151(2) w/o recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
151
Distributor Rotational Speed, secs/rotation 60 O&M Manual 150 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 40 Calculated based on Distributor
Rotation and Flow Rate
100 Depends on BOD5 Loading, 200 to 600 mm/rotation recommended for BOD5 loading 200 lbs/1,000 ft3/day
150
Performance for BOD5 Removal, % 35 w/ recycle
74 w/o recycle
O&M Manual 21(2) w/ recycle
55(2) w/o recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
55 Intermediate Clarifier
Flow Rate, mgd 3.6 O&M Manual 3.5 Variable 3.5
Nominal Overflow Rate at AA Flow, gpd/ft2 935 O&M Manual 909 800 - 1,200 909 STFPS
Flow Rate, mgd 23 O&M Manual 23 Variable 23
STFs
Hydraulic Loading, gpm/ft2 0.31 O&M Manual 0.31() 1 - 3 (Roughing)
0.3 - 1.5 (CBOD and Nitrifying)
0.31 Recirculation Ratio at AA Flow 0.46 O&M Manual 0.68 Variable, hydraulic, and organic loading more critical 0.46 BOD5 Loading, lbs/1,000 ft3/day 111 w/ recycle
75 w/o recycle
O&M Manual 73(2) w/ recycle
43(2) w/o recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
43 Distributor Rotational Speed, secs/rotation 150 to 180 O&M Manual 150 (July 19-20, 2023, visit) Variable 480 SK, mm/rotation -- -- 15 to 20 Depends on BOD5 Loading, 100 to 300 mm/rotation recommended for BOD5 loading 100 lbs/1,000 ft3/day
50 Performance for CBOD Removal, % 56 w/o recycle -- 60(2) w/o recycle 40 - 70% BOD5 Removal (Roughing) < 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
60 Secondary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 400 O&M Manual 232 400 - 800 400 Overflow Rate at AA Flow with Recirculation, gpd/ft2 750 O&M Manual 747 800 - 1,200 750 VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21
Process/Parameter Original Design
Capacity or Rating Source Average Performance From 2018 - 2024 MOP 8(1) or Typical Values Recommended Operation for Performance Assessment Gravity Thickeners
Hydraulic Loading, gpd/ft2 462 O&M Manual 338(2) 500 to 750 462 Solids Loading, lbs BOD5/ft2/day 24 O&M Manual -- 12 to 20 12 to 20 Solids Loading, lbs TSS/ft2/day 14.2 -- 9.3(2) <22 <22
Thickened Sludge TSS, % 6.5 O&M Manual 4.5(2) 5 to 9 4.5 Digesters
HRT, days 20 O&M Manual 15.9 15 day minimum for single-stage mesophilic digesters (Class B) 20 Percent TS -- -- 2.3 1.5 to 2.5 Developed for Capacity Evaluation Percent VS -- -- 1.6 1.0 to 1.7 Developed for Capacity Evaluation VSS Loading, lbs/ft3/day 0.10 - 0.15 O&M Manual 0.146 0.15 - 0.20 0.15 - 0.20 VS Reduction, % 55 O&M Manual 61 Minimum 38 percent for Class B Minimum 38 percent for Class B Volatile Acids, mg/L 50 to 500 O&M Manual 166 500 Max 500 Max Alkalinity, mg/L as CaCO3 1,500 to 3,000 O&M Manual 3,300 1,500 to 5,000 1,500 to 5,000 Volatile Acids/Alkalinity Ratio -- -- 0.05 0.10 to 0.35 0.10 to 0.35 pH 6.8 to 7.4 O&M Manual 7.0 6.8 to 7.2 6.8 to 7.2
Gas Production, ft3/day -- -- 151,000 Variable Variable Gas Production, ft3/lb VS removed 12 to 17 O&M Manual 17.4 12 to 18 12 to 18 Sludge Drying Beds
Solids Loading, lbs/day 15,700 O&M Manual 11,000 Variable 15,700 Solids Loading, lbs/ft2/year 10.9 O&M Manual 7.6 15 to 25 (typical) 11 Solids Off Hauled From Beds (Wet Tons/year) -- -- 19,660 Variable -- Percent TS Off Hauled 60% O&M Manual 70% reported 50 to 90% 70 Notes:
CaCO₃ - calcium carbonate; ft2 - square feet; gpm - gallons per minute; HRT - hydraulic residence time; mm - millimeter; PTFPS - primary trickling filter pump station; TS - total solids; VS - volatile solids; SK - Spulkraft. (1) Design of Water Resource Recovery Facilities, MOP8. (2) Determined from a special 1-week sampling event conducted in December 2023.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22
1.4.5.1 Primary Treatment
The primary treatment system includes both clarification and biological treatment. Primary clarifiers remove settleable solids and floatable from wastewater through quiescent conditions that allow sedimentation of heavier particles (sludge) and flotation of lighter solids (scum). Effluent from both primary clarifiers is pumped to both PTFs through the PTFPS. When influent flows to the plant are above
3.9 mgd, the total primary clarifier effluent will exceed 19.5 mgd. The excess flow to the PTFPS falls over a weir, mixes with intermediate clarifier effluent, and then flows to the secondary treatment process. The settled primary sludge is pumped to the gravity thickeners.
Primary Clarifiers
Following preliminary treatment, the primary influent flow is combined with recycle flow from the PTFs in the mixing box at the outlet end of the grit chamber. The primary influent also includes sludge from the intermediate and secondary clarifiers, which are returned to Junction Box C upstream of the grit chamber.
The settled primary sludge is moved inward toward the sludge pocket in the clarifier bottom by two rows of angled scrapers, one row mounted on each arm of the continuously rotating clarifier sweep mechanism. The primary sludge is withdrawn continuously by the primary sludge pumps which transfer it to the gravity thickeners.
Surface overflow rate (SOR) is a key parameter used for design and assessment of primary clarifiers.
Figure 1.10 shows the SOR for the primary clarifier at WWTP for the evaluation period. SOR for primary clarifiers was calculated using the average daily flow for the evaluation period and a constant recycle flow of 16 mgd. As seen in Figure 1.8, the SOR for primary clarifiers is below the average design value and well within the typical SORs for primary clarifiers. The average CBOD and TSS removal during the sampling period was 30 and 64 percent, respectively. The performance of the primary clarifier is also well within the typical range of 30 to 35 percent CBOD and 60 to 65 percent TSS removal. The removal rate is expressed in terms of CBOD since CBOD data was collected for all streams instead of BOD5.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23
Figure 1.10 SORs for Primary Clarifiers
Primary Trickling Filters
Both primary clarifiers discharge effluent through a common pipe to the PTFPS wet well. The pumping rate for PTF No. 1 is 11.7 mgd and for PTF No. 2 is 7.8 mgd. A portion of the flow from PTF No. 1 goes to an Intermediate Clarifier, discussed below, and the remainder is recycled, together with all flow from PTF No. 2.
The distributed wastewater trickles slowly down through the 12-foot depth of plastic media. The type of plastic media is not indicated in the O&M manual, although most plastic media for this type of filter would be a vertical configuration.
The trickling filters are typically characterized based on three parameters: BOD5 removal efficiency, hydraulic loading, and organic loading. Both PTF No. 1 and PTF No. 2 have very high hydraulic and organic loadings (2.9 and 1.9 gpm/ft2; and 385 and 285 lbs BOD5/1,000 ft3/day respectively) based on the design criteria and are therefore classified as "roughing" filters. Note that the organic loadings in the design criteria are calculated including recycle. The rotational speed for the distributor arm results in an SK value ranging from 45 to 100 mm/rotation. This is a measure of the amount of water applied per 1 revolution of the distributor arm. For trickling filters operating at such a high loading rate, a minimum SK value of 200 to 600 mm/rotation is recommended to maintain healthy biology. With too low of an SK value, the trickling filter may be more susceptible to experiencing poor hydraulic distribution and VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24
flushing, which could result in septic conditions within the unit. Increasing the SK value can be achieved by reducing the rotational speed of the distributor.
The filters are designed to achieve 35 percent BOD5 removal and no nitrogen removal. Based on the wastewater sampling, the organic loading excluding recycle for PTF No. 1 and No. 2 is 248 and 151 lbs BOD5/1,000 ft3
/day, respectively. The organic loading with recycle for PTF No. 1 and No. 2 is 380 and 253 lbs BOD5/1,000 ft3
/day. The average CBOD removal for PTF No. 1 and No. 2 from the sampling plan is 51 and 55 percent, respectively. The removal rates and loadings are calculated in terms of CBOD since CBOD data was collected for all streams instead of BOD5.
Intermediate Clarifier
The Intermediate Clarifier is unique in that it only receives flow from PTF No. 1 and is the only clarifier at this treatment plant which does not have scum collection or removal equipment. All floatable material, which may be present in the intermediate clarifier, will pass over the effluent weir and ultimately be removed in the secondary clarifiers.
Up to 3.9 mgd of the effluent from PTF No. 1 is sent to the intermediate clarifier to remove settleable solids. The clarified effluent from the intermediate clarifier flows through a 24-inch pipe to a small box at the outlet side of the PTFPS, where it is combined with the portion of the primary clarifier effluent which has not been pumped to either PTF.
The intermediate clarifier provides only 13 percent TSS removal and therefore, it is not performing well. As mentioned, this is probably as a result of the poor settling characteristic of the PTF solids.
1.4.5.2 Secondary Treatment
The secondary treatment system consists of two STFs, two secondary clarifiers, a STFPS, secondary pump station, and percolation ponds. Secondary treatment is a biological process that removes BOD5 and TSS from the wastewater to meet regulatory requirements. The plant effluent is then discharged to percolation ponds, where the water is returned to the groundwater basin.
Secondary Trickling Filters
The STFs receive flow from the STFPS. The feed is a mixture of bypass flow from the PTFPS and overflow from the Intermediate Clarifier. The flow is distributed evenly over both STFs through rotary distributor arms. The filters are filled with modular plastic cross-flow media to a depth of 3.33 feet. As water flows through the filter media, biological organisms growing on the media draw remaining organic material from the wastewater and convert it to settleable solids.
To maintain the required wetting rate on the STFs, a portion of the secondary clarifier effluent is recycled to the pump station. The amount of recycled secondary effluent decreases as primary effluent flow increases.
With a design hydraulic loading rate of 0.31 gpm/ft2 and an organic loading rate (including recycle) of 111 lbs BOD5/1,000 ft3/day, the STFs (like the PTFs) are classified in the high-rate range. The current hydraulic loading for the STFs is estimated to be 0.33 gpm/ft2, which is close to the design value but on the low range of typically recommended hydraulic loading rates. Insufficient wetting rates could result in poor hydraulic distribution within the media, and reduced performance. The secondary distributors rotate VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-25
at 2.5 to 3 minutes per revolution, which results in a SK value of 15 to 20 mm/rotation. At the design organic loading rate, the recommended SK value is 100 to 300 mm/rotation. Like the PTFs, the secondary filters may benefit from reducing the distributor rotational speed.
The average organic loading (excluding recycle) for STFs is 43 lbs BOD5/1,000 ft3 /day, and the average
CBOD removal (excluding recycle) is 60 percent. The removal rates and loadings are calculated in terms of CBOD since CBOD data was collected for all streams instead of BOD5.
Secondary Clarifiers
The secondary clarifiers provide quiescent conditions for the sludge to settle and scum to float to the surface. Secondary clarifier effluent flow that is not recirculated back to the STFs is discharged to the percolation ponds. Settled secondary sludge or scum collected in the secondary clarifiers is pumped back to upstream of the grit chambers. The secondary clarifiers are operating at their design SOR rate of 750 gpd/ft2 (including recirculation), which is well within typical rates for clarifiers.
The secondary clarifiers are shallow with a depth of 10 ft. Typical depth for secondary clarifiers ranges from 14 to 16 ft. The shallow secondary clarifiers are suitable for a two-stage trickling filter process since the solids loading is typically lower than an activated sludge process.
1.4.5.3 Solids Handling
The solids handling system includes sludge and scum pumping, sludge thickening, sludge digestion, digested sludge settling, drying, and disposal. The purpose of the gravity thickeners is to receive all sludge pumped from the primary clarifiers and provide quiescent conditions during which the sludge and scum will thicken until a concentration of solids is reached which is suitable for addition to the digesters, typically in the 3 to 5 percent range.
The purpose of the digesters is to retain the digesting sludge under anaerobic conditions for a minimum period in order to stabilize the biosolids sufficiently for disposal.
Gravity Thickeners
The gravity thickeners receive all the sludge pumped from the primary clarifiers. Gravity thickeners are evaluated based on hydraulic loading and solids loading. The current hydraulic loading rate for the gravity thickeners is approximately 338 gpd/ft2 compared to the design hydraulic loading rate of 462 gpd/ft2. The design organic loading rate is 24 lbs BOD5/ft3/day. The thickened sludge is pumped to the digesters, and the clarified thickener overflow is returned to the PTFPS.
Figure 1.11 shows the thickened sludge flow which is pumped to the digesters and Figure 1.12 shows the percent TS for thickened sludge during the evaluation period. The target percent TS for thickened sludge is 6.5 percent. However, for the evaluation period, the average percent TS for thickened sludge is about
4.5 percent as shown in Figure 1.12. The overflow rate is below the design value and within typical rates for the thickeners. The solids loading rate is approximately 9.3 lbs TSS/ft2/day, which is below the design rate of 14.2 lbs TSS/ft2/day and well below the typical maximum loading rate of 22 lbs TSS/ft2/day.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
Figure 1.11 Thickened Sludge Flow Rates
Figure 1.12 Thickened Sludge TS Concentration
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
Digesters
The anaerobic digestion of sludge by bacteria is a sequential process. The first stage is acid fermentation, and the second stage is methane fermentation. The organic acids produced during acid fermentation are subsequently utilized by bacteria, resulting in the release of methane and carbon dioxide gas. Both stages occur in the single-stage mesophilic digesters operated by the City.
Stabilization of the sludge is accomplished during the methane fermentation stage. In this stage, the organic acids produced during acid fermentation are converted to methane and carbon dioxide resulting in a reduction of the organic material in the system.
VS loading and the HRT are key parameters used for assessing performance. The design HRT for the digesters at the WWTP is about 20 days. For the evaluation period, only two out of four digesters were in operation (No. 1 and No. 3). The digesters operate in parallel, and the average HRT for Digesters No. 1 and No. 3 is approximately 16 days. Figure 1.13 shows the daily average HRTs for Digesters No. 1 and No. 3. While the average is above the regulatory required minimum HRT of 15 days to achieve a Class B biosolids, there are periods where the HRT approaches 15 days. This is likely due to the lower percent solids of the thickened feed from the gravity thickeners (4.5 percent versus 6.0 percent).
Figure 1.13 Anaerobic Digester Hydraulic Retention Time VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28
VS loading rate for the evaluation period was about 0.15 lbs/ft3/day as shown in Figure 1.14. Typical values for VSS loading ranges from 0.12 to 0.16 lbs/ft3/day. The VSS loading is at the lower end of the recommended maximum range of 0.15 to 0.20 lbs/ft3/day.
Figure 1.14 Anaerobic Digester VS Loading Rate
Apart from the HRT and VSS loading, other operational parameters used to assess their health are illustrated in Figure 1.15 through Figure 1.21 below. In general, all of the parameters evaluated indicate the digesters are performing well and within their design and typical values. The typical maximum operating range for all the parameters is shown in the grey shaded zone.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29
Figure 1.15 Anaerobic Digester pH
Figure 1.16 Anaerobic Digester Volatile Acids
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-30
Figure 1.17 Anaerobic Digester Alkalinity
Figure 1.18 Anaerobic Digester Gas Production
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31
Figure 1.19 Anaerobic Digester Temperature
Figure 1.20 Anaerobic Digester VS Reduction
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
Figure 1.21 Anaerobic Digester Volatile Acids/Alkalinity Ratio Sludge Drying Beds
Digested sludge is transferred from the digesters to drying beds. Each of the sludge beds is equipped with overflow rings that are used to decant clear liquid from the beds back to the decant pump at Supernatant Pit No. 1. By decanting clear liquid, the drying time in the bed can be reduced. The City's WWTP has about 18 drying beds that cover 12 acres of land. The design solids loading rate is
10.9 lbs/ft2/year. Based on the reported digested sludge quantity and characteristics, the average solids loading during the review period is calculated to be 7.6 lbs/ft2/year and should have capacity to accommodate more sludge. Note that during wet years, the available capacity may be less. Reported TS concentration off hauled from the drying beds is 70 percent.
1.5 Process Modeling - Existing Facilities
A steady state plant wide model was developed using BioWin version 6.2 (EnviroSim) to help evaluate the current performance, near-term recommendations, and evaluate future nitrogen removal alternatives.
Figure 1.22 shows a process flow schematic developed in BioWin for the WWTP.
The model was developed using custom-configured unit process modules that reflect the existing configuration and operation at the City's WWTP. Physical dimensions (volume, area, and depth) of each unit process and flow rates for all process streams were used as inputs for the model. Historical operational data and data collected from the wastewater sampling plan were used to calibrate the model.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
Figure 1.22 Process Model for City's WWTP
The BioWin model utilizes COD modeling which uses influent COD data as an input as well as various COD fractions such as readily biodegradable, acetate, non-colloidal slowly biodegradable, unbiodegradable soluble, and unbiodegradable particulate. Constituents such as CBOD, BOD5 and TSS are calculated based on the influent COD and specified wastewater fractions.
Based on the sampling plan data, the COD to BOD5 and COD to CBOD ratio in the influent was higher than the typical range for municipal wastewater. Therefore, three different process modeling approaches were used to match the influent wastewater characteristics and current plant performance.
The first approach focused on matching the influent COD concentrations while modifying wastewater fractions calculated from the sampling plan only. Since the COD to CBOD ratio during the sampling period was higher than the typical range, it was difficult to match the influent CBOD for this approach without calibrating additional parameters.
The second approach focused on matching influent COD, BOD, and TSS concentrations while modifying wastewater fractions calculated from the sampling plan as well as additional parameters to help calibrate the influent wastewater characteristics and current plant performance. This approach provided a good match on the influent and secondary trickling filter performance; however, it didn't provide a good match for the PTF performance. This approach provided an insight into the overall performance of the City's WWTP. Based on the sampling plan results and model prediction results from the second approach, it was concluded that the PTFs are performing better than their design values while the STFs are performing worse than their design values.
The third approach focused on matching the primary and secondary trickling filter performance by modifying the specific area for both primary and STFs which directly affects the performance of the trickling filters.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34
The calibrated parameters for each of the three modeling approaches are listed in Table 1.10.
Table 1.10 Process Model Calibration Parameters
Parameter Default/Design Approach 1 Approach 2 Approach 3 Fbs - readily biodegradable COD (including acetate) 0.16 0.35 0.35 0.35 Fus - unbiodegradable soluble 0.05 0.1 0.1 0.1
Fna - ammonia 0.66 0.81 0.81 0.81
Fpo4 - phosphate 0.50 0.48 0.48 0.48
Particulate COD:VSS 1.63 2.00 2.00 2.00
BOD calculate rate constant for Xsc degradation 0.5 0.5 0.1 0.1 BOD calc rate constant for Xsp degradation 0.5 0.5 0.1 0.1 PTF No. 1 Specific Area, ft2/ft3 27 27 27 105
PTF No. 2 Specific Area, ft2/ft3 42 42 42 85
STF No. 1 & No. 2 Specific Area, ft2/ft3 42 42 42 18
Table 1.11 provides the model outputs for each of the three approaches. As described earlier, approach 1 and 2 do not match the PTF performance and approach 3 matches the overall plant performance. A few observations worth noting from model calibration are:
For approach 2, the BOD rate constants had to be modified significantly. The BOD rate constant accounts for BOD inhibition due to additional non-municipal influent load. Approach 2 matches the sampling period data for most of the key process streams and parameters except for PTF No. 1 and No. 2 effluent.
For approach 3, the specific areas for PTFs and STFs had to be modified significantly to match the performance.
Approach 3 matches the sampling period data the best (<10 percent difference) for key process streams and parameters.
For each of the approaches the model predicted higher TS (lbs/day) loading for sludge thickeners and anaerobic digesters compared to the data collected from the sampling event. However, when compared to the historical data, the thickened sludge and digested sludge data better match the model outputs. Since the primary, thickened, and digested sludge samples were analyzed as grab samples, it is possible that the data collected from the sampling period is not representative of the actual TS loading. Furthermore, both primary, thickened, and digested sludge data showed a lot of variation during the sampling period. Additionally, the WWTP experienced lower incoming loads during the sampling event.
The process model was used to evaluate various near term process improvement recommendations and the findings from the evaluation are described in the draft of TM 1, included in Appendix A.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-35
Table 1.11 Process Model Calibration Summary
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Influent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 915 915 915 915
CBOD, mg/L(1) 317 447 320 320
TSS, mg/L 232 249 243 243
TKN, mg/L 64 64 64 64
Grit Chamber Influent
Flow, mgd 7.23 7.23 7.23 7.23
COD, mg/L 1,001 1,004 1,026 993
CBOD, mg/L 326 500 367 349
TSS, mg/L 296 369 349 323
Grit Chamber Effluent
Flow, mgd 23 23 23 23
COD, mg/L 610 642 626 538
CBOD, mg/L 200 305 239 180
TSS, mg/L 168 184 170 174
Primary Effluent
Flow, mgd 23 23 23 23
COD, mg/L 390 465 459 368
CBOD, mg/L 141 228 194 133
TSS, mg/L 61 68 63 64
CBOD Removal, % 30 27 21 28
TSS Removal, % 64 64 64 64
PTFPS
Flow, mgd 23 23 23 23
COD, mg/L 418 481 465 374
CBOD, mg/L 132 236 361 268
TSS, mg/L 71 78 67 68
PTF No. 1 Effluent
Flow, mgd 11.7 11.7 11.7 11.7
COD, mg/L 382 472 457 350
CBOD, mg/L 115 225 188 110
TSS, mg/L 91 91 80 100
CBOD Removal, % 51 55 35 56
Organic Loading, lbs BOD5/1,000 ft3/day 248 244 309 267 VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 PTF No. 2 Effluent
Flow, mgd 7.8 7.8 7.8 7.8
COD, mg/L 392 448 432 314
CBOD, mg/L 104 209 174 96
TSS, mg/L 87 109 98 113
CBOD Removal, % 55 43 40 62
Organic Loading, lbs BOD5/1,000 ft3/day 151 148 126 86
Intermediate Clarifier Effluent
Flow, mgd 3.4 3.4 3.4 3.4
COD, mg/L 326 465 449 341
TSS, mg/L 79 87 75 94
TSS Removal, % 13 9 10 10
STFPS
Flow, mgd 21 21 21 21
COD, mg/L 280 262 255 222
CBOD, mg/L 70 98 82 59
TSS, mg/L 55 52 47 45
STF No. 1 & No. 2 Effluent
Flow, mgd 21 21 21 21
COD, mg/L 205 216 208 198
CBOD, mg/L 49 60 50 45
TSS, mg/L 59 81 75 58
CBOD Removal, % 60 74 74 63
Organic Loading, lbs BOD5/1,000 ft3/day 43 80 35 42
Effluent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 165 156 153 154
CBOD, mg/L 29 32 27 28
TSS, mg/L 28 37 34 27
NH3-N, mg/L 37 48 48 49
NO3-N, mg/L 2.4 0 0 0
NO2-N, mg/L 3.3 0 0 0
TIN, mg/L 42.7 48 48 49
Primary Sludge
Flow, mgd 0.65 0.65 0.65 0.65
TSS, mg/L 2,857 4,198 3,880 3,977
TSS, lbs/day 15,489 22,760 21,032 21,560
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-37
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Thickener Underflow
Flow, mgd 0.06 0.06 0.06 0.06
% TS 3.6 4.5 4.4 4.5
TS, lbs/day 17,871 22,346 21,797 22,344
Digested Sludge
Flow, mgd 0.055 0.055 0.055 0.055
% TS 1.6 2.2 2.1 2.2
% VS 0.69 0.76 0.79 0.79
HRT, days 19 19 19 19
VS Removed, % 58 58 58 58
VS Removed, lbs/day 10,406 10,540 10,575 10,861
Gas, scfm 107 131 133 133
Gas, scf/lbs VS Removed 14 18 18 18
Solids to Beds
TS, lbs/day 7,166 10,204 9,669 9,883
Solids Off-Hauled from Beds
TS, lbs/day -- 9,694 9,476 9,685
Notes:
(1) BioWin uses CBOD for its calculations.
1.6 Capacity Evaluation
The City is at a cross-roads in deciding whether to continue to invest in the trickling filter facilities or pivot to the planning and design of new activated sludge facilities. While the development of the existing trickling filter plant model was useful for characterizing the City's influent and evaluating unit process performance and optimization opportunities, there is little value in developing unit process capacity ratings for the existing facility due to the following reasons:
The influent loads to the WWTP are nearing the original design capacity, and the WWTP is having issues complying with the previous discharge Requirements (Order No. R3-2010-000) for BOD5 and TSS. Furthermore, the future discharge limits (Order No. R3-2020-0020) are more stringent with respect to both BOD5 and TSS, and include a TN limit too. As a result, with future limits and WWTP capacity in mind, major modifications would be necessary. While interim optimization improvements will improve effluent quality, they are unlikely to be the most cost-effective solution for meeting future limits long term.
Developing unit process capacity criteria for the existing plant will not be useful to the City unless the City is committed to staying with trickling filter technology. Assuming the City is likely to move away from trickling filter technology, unit process capacities should be established for any facilities that will be retained once an alternative is selected. This is because the unit processes are designed to work in tandem, and the biological sludge production and capacity will be different depending on the secondary process technology in use. Ultimately this will impact the rated capacity for all biological and solids handling processes. It is recommended that unit process capacities be developed once an alternative selection is made. Discussion of treatment alternatives for meeting the future effluent discharge limits is presented in Volume 6 - Liquid Treatment.
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A TM 1: EXISTING WWTP PROCESS,
HISTORICAL PERFORMANCE, AND
CONCEPTS FOR NEAR-TERM EFFLUENT
QUALITY IMPROVEMENT
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TECHNICAL MEMORANDUM 1
Existing WWTP Process, Historical Performance,
and Concepts for Near-Term Effluent Quality
Improvements
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TECHNICAL MEMORANDUM 1
Existing WWTP Process, Historical
Performance, and Concepts for
Near-Term Effluent Quality
Improvements
FINAL / October 2026
Digitally signed by Andre Gharagozian
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.22 14:54:18-07'00'
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/TM01/TM01 Contents
TM 1 EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND
CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY
IMPROVEMENTS
1.1 Purpose and Recommendations 1-1
1.2 Flow and Load Summary 1-2
1.3 Existing Facilities Description 1-7
1.4 Performance Evaluation 1-9
1.4.1 Permit Limits 1-9
1.4.2 Historical Performance 1-11
1.4.3 Effluent Nitrogen 1-12
1.4.4 Wastewater Sampling and Characterization 1-12
1.4.5 Unit Process Evaluation 1-15
1.5 Process Modeling 1-29
1.6 Optimization Elements 1-34
1.6.1 Influent Loading 1-34
1.6.2 Primary Clarifiers 1-35
1.6.3 PTFs 1-35
1.6.4 STFs 1-36
1.6.5 Secondary Clarifiers 1-36
1.6.6 Gravity Thickeners 1-37
1.7 Recommendations and Next Steps 1-37
Appendices
APPENDIX 1A DESIGN CRITERIA
APPENDIX 1B RECOMMENDED SAMPLING PLAN
APPENDIX 1C SK VALUE CALCULATIONS
Tables
Table 1.1 Historical Influent Flow and Peaking Factor Data 1-2 Table 1.2 Historical Influent Concentrations 1-3
Table 1.3 Historical Influent Loadings 1-4
Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) 1-9 Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 1-10
Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 1-10
Table 1.7 Summary of Historical Performance Through September 2023 1-11 Table 1.8 Summary of Wastewater Sampling Plan Data 1-14 TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 1.9 Unit Process Performance 1-16
Table 1.10 Process Model Calibration Parameters 1-31
Table 1.11 Process Model Calibration Summary 1-32
Figures
Figure 1.1 Historical Influent Flow 1-3
Figure 1.2 Historical Influent CBOD, BOD₅ and TSS Concentrations 1-5 Figure 1.3 Historical Influent CBOD, BOD₅ and TSS Loadings 1-6 Figure 1.4 Historical Influent TKN and NH3-N Concentrations 1-6 Figure 1.5 Process Flow Diagram 1-8
Figure 1.6 Effluent TSS and CBOD 1-11
Figure 1.7 Effluent Ammonia, Nitrate, and Nitrite 1-12
Figure 1.8 Surface Overflow Rates for Primary Clarifiers 1-20 Figure 1.9 Thickened Sludge Flow Rate 1-23
Figure 1.10 Thickened Sludge Total Solids Concentration 1-23 Figure 1.11 Anaerobic Digester Hydraulic Retention Time 1-24 Figure 1.12 Anaerobic Digester Volatile Solids Loading Rate 1-25 Figure 1.13 Anaerobic Digester pH 1-26
Figure 1.14 Anaerobic Digester Volatile Acids 1-26
Figure 1.15 Anaerobic Digester Alkalinity 1-27
Figure 1.16 Anaerobic Digester Gas Production 1-27
Figure 1.17 Anaerobic Digester Temperature 1-28
Figure 1.18 Anaerobic Digester Volatile Solids Reduction 1-28 Figure 1.19 Anaerobic Digester Volatile Acids/Alkalinity Ratio 1-29 Figure 1.20 Process Model for City’s WWTP 1-30
Figure 1.21 Primary Clarifier Performance Improvement 1-35 Figure 1.22 Secondary Clarifier Performance Improvement 1-37 TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AA annual average
BOD₅ 5-day biochemical oxygen demand test
CaCO3 calcium carbonate
CBOD carbonaceous biochemical oxygen demand
City City of Santa Maria
ft2 square feet
ft3 cubic feet
gpd gallons per day
gpm gallons per minute
HRT hydraulic residence time
klb thousand pounds
lb pound
mg/L milligrams per liter
mgd million gallons per day
mL/L milliliters per liter
MM maximum month
mm millimeter
NH3-N ammonia
NO2-N nitrite
NO3-N nitrate
NOA Notice of Applicability
O&M operations and maintenance
PH peak hour
PTF primary trickling filter
PTFPS primary trickling filter pump station
RWQCB Regional Water Quality Control Board
SK Spulkraft
SOR surface overflow rate
STF secondary trickling filter
STFPS secondary trickling filter pump station
TKN total Kjeldahl nitrogen
TM technical memorandum
TN total nitrogen
TS total solids
TSS total suspended solids
VS volatile solids
VSS volatile suspended solids
WDR waste discharge requirements
WWTP wastewater treatment plant
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
TM 1 EXISTING WWTP PROCESS, HISTORICAL
PERFORMANCE, AND CONCEPTS FOR
NEAR-TERM EFFLUENT QUALITY
IMPROVEMENTS
1.1 Purpose and Recommendations
The purpose of this Technical Memorandum (TM) is to summarize the existing facilities at the City of Santa Maria (City) Wastewater Treatment Plant (WWTP), the facilities’ intended design basis, and to review historical wastewater influent and performance data. This TM also provides a basis for developing near-term recommendations to improve the WWTP’s performance and reliability for meeting the Waste Discharge Requirements (WDR).
As part of this assessment, Carollo Engineers has also developed a Wastewater Characterization Sampling Plan to supplement the routinely collected operating data. Once the results from that effort are complete, this TM will be updated. In addition, the results will be used to calibrate a plant process model, which will be leveraged to better evaluate near-term recommendations, establish unit process capacity, and evaluate future nitrogen removal alternatives.
The City should consider the following as opportunities to improve and optimize performance:
Septage and Leachate Characterization - Characterize the loading impact of septage and leachate to determine if this is a contributing factor to recent performance changes. If so, the City may want to consider reducing or eliminating septage or leachate.
Ferric Addition at Primary Clarifiers - Ferric chloride addition upstream of the primary clarifiers should improve liquid stream performance by removing biochemical oxygen demand. This was shown to be the case in the recently performed jar testing. But the cost to implement ferric chloride addition and the benefits should be considered once the wastewater characterization sampling results are available.
Reduce Distributor Speed with Primary Trickling Filters (PTFs) and Secondary Trickling Filters (STFs) - A preliminary review of the Spulkraft (SK) values indicates the distributors on the PTFs are rotating much faster than typical recommended rates. To optimize performance, the rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units.
STFs Feed Pumping - The wetting rate for the STFs is 0.3 gallons per minute (gpm)/square feet (ft2), which is on the low end of what is typically recommended for this type of filter (0.3 to 1.5 gpm/ft2).
Increasing the feed pumping rate and the wetting rate may improve flushing, oxygen transfer, and overall performance.
Secondary Clarifier Performance - The City should consider the addition of a polymer at the secondary clarifiers to help reduce effluent total suspended solids (TSS) and 5-day carbonaceous TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
biochemical oxygen demand (CBOD) concentrations. Most polymer suppliers can offer support to perform jar testing and recommend a suitable polymer.
1.2 Flow and Load Summary
Table 1.1 summarizes the historical influent flow data for the City’s WWTP including annual average (AA), maximum month (MM), and peak hour (PH) flows from January 2018 through September 2023. The “design” values in the right-hand column show the design criteria taken from the most recent plant expansion project. Although the plant AA flow over the past six years is 7.3 million gallons per day (mgd) compared with the design flow of 12.5 mgd, the organic loading rates (discussed later) are relatively high.
Table 1.1 Historical Influent Flow and Peaking Factor Data Flow 2018 2019 2020 2021 2022 2023 Average Design
AA, mgd 7.4 6.8 7.3 7.0 7.3 7.7 7.3 12.5
MM, mgd 8.5 7.3 7.9 7.5 8.0 8.6 8.0 13.5
MM Peaking Factor
(i.e., MM/AA Flow)
1.15 1.07 1.08 1.07 1.10 1.08 1.10 1.08
PH, mgd -- 12.9 18.2 12.6 13.3 17.1 14.8 24
PH Peaking Factor
(i.e., PH/AA Flow)
-- 1.90 2.49 1.80 1.82 2.23 2.05 1.9
Figure 1.1 shows the average influent flow to the WWTP for the evaluation period. The solid black line represents the 30-day running average, which can be compared to the design MM flow. As seen in Figure 1.1, the average influent flow since 2018 has been fluctuating between 6 to 8 mgd and has slightly increased over the last couple of years. In general, influent flows are less than the design capacity, and MM and PH peaking factors are close to the original design basis.
The City regularly collects and analyzes 24-hour time-based (sampled every 20 minutes) composite samples of their influent just downstream of the bar screens. The CBOD and TSS are sampled biweekly, while influent nitrogen species are measured quarterly. Table 1.2 presents the historical concentration data, and Table 1.3 summarizes the average and maximum month historical loads of key constituents such as CBOD, TSS, total Kjeldahl nitrogen (TKN), and ammonia (NH3-N). The MM concentrations are calculated using MM loads and AA flow.
As shown in Table 1.2, the average annual CBOD over the last six years was 414 milligrams per liter (mg/L), roughly equal to a 5-day biochemical oxygen demand test (BOD₅) concentration of around 496 mg/L, assuming a ratio of 1.2. This ratio will be confirmed following the on-site sampling exercise referred to above. The average CBOD concentration so far for 2023 is 41 percent higher than the design value of 317 mg/L. So, although the current average influent flows are only about 64 percent of the design value, the influent CBOD load is more than 80 percent of the design value. Similarly, for TSS, the influent loads are currently more than 80 percent of the design value.
The NH3-N and TKN values are consistent with typical characteristics for domestic wastewater.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Figure 1.1 Historical Influent Flow
Table 1.2 Historical Influent Concentrations
Constituent 2018 2019 2020 2021 2022 2023 Average Design CBOD
AA, mg/L 410 411 413 380 407 412(2) 405 263(4)
MM(3), mg/L 469 453 527 450 496 521(2) 486 287(4)
BOD
AA, mg/L -- -- -- -- -- 504(5) 504 317
MM(3), mg/L -- -- -- -- -- --(6) -- 346
TSS
AA, mg/L 395 417 377 401 374 391 393 323
MM(3), mg/L 474 464 501 457 425 513 472 382
TKN
AA, mg/L 72 75 75 67 71 66 71 --
NH3-N
AA, mg/L 47 51 50 52 45 46 48 --
Notes:
(1) Samples analyzed once per week for CBOD and TSS, and quarterly for TKN and Ammonia-N. (2) Includes data through September only, City switched to sampling BOD₅ starting October 2023. (3) Back calculated using MM loading and average flows. (4) Calculated using the BOD₅ design values and an assumed CBOD to BOD₅ ratio of 0.83. (5) Includes data from October through December only.
(6) Not enough data to calculate MM concentration.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Table 1.3 Historical Influent Loadings
Constituent 2018 2019 2020 2021 2022 2023 Average Design CBOD
AA, klb/day 25.6 23.0 25.4 22.2 24.9 27.1(1) 24.7 27.4(2) MM, klb/day 28.9 25.7 32.1 26.1 30.2 33.4(1) 30.1 32.4(2) MM Peaking Factor
(MM/AA)
1.13 1.15 1.26 1.18 1.21 1.36 1.22 1.18(3)
BOD
AA, klb/day -- -- -- -- -- 28.0(4) 28.0 33.0
MM, klb/day -- -- -- -- -- --(5) -- 39.0
MM Peaking Factor
(MM/AA)
-- -- -- -- -- --(5) -- 1.18
TSS
AA, klb/day 24.7 23.4 23.1 23.4 22.8 24.9 23.7 33.6
MM, klb/day 29.2 26.3 30.5 26.5 25.9 32.9 28.5 42.8
MM Peaking Factor
(MM/AA)
1.33 1.12 1.32 1.13 1.16 1.30 1.23 1.27
Notes:
klb - thousand pounds
(1) Includes data through September only, City switched to sampling BOD₅ starting October 2023. (2) Calculated using the BOD₅ design values and an assumed CBOD to BOD₅ ratio of 0.83. (3) Assumed same design MM peaking factor as of BOD₅.
(4) Included data from October through December only.
(5) Not enough data to calculate MM loadings and peaking factor.
Figure 1.2 shows the historical average TSS and CBOD concentrations for the evaluation period. As seen in Figure 1.2, average TSS and CBOD concentrations have remained consistently in the range of 380 to 410 mg/L during the review period. However, TSS and CBOD concentrations are significantly higher than the original design values.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Figure 1.2 Historical Influent CBOD, BOD₅ and TSS Concentrations Figure 1.3 shows the historical average TSS and CBOD loadings at the WWTP. Although the TSS and CBOD concentrations are higher than the original design values, influent loads are still less than the design since the average influent flows are only 60 percent of the original design rating of 12.5 mgd AA flow. Both TSS and CBOD loadings have increased slightly in the last two years. Figure 1.4 shows the historical average TKN and NH3-N concentrations for the evaluation period. Average TKN and NH3-N concentrations have remained fairly consistent for the evaluation period.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Figure 1.3 Historical Influent CBOD, BOD₅ and TSS Loadings Figure 1.4 Historical Influent TKN and NH3-N Concentrations TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
1.3 Existing Facilities Description
The City’s WWTP is located at 601 Black Road, Santa Maria, California 93458. The WWTP is a two-stage trickling filter plant and is designed to treat 12.5 mgd of AA flow. The existing facilities description is primarily generated from the WWTP’s operations and maintenance (O&M) manual.
The influent wastewater flow is measured with a Parshall flume. The wastewater is then screened through a 0.5-inch bar screen to remove rags, sticks, and large objects that can clog pumps or damage equipment.
The screened wastewater then flows to two parallel aerated grit chambers to remove sand and grit followed by primary clarification. At the influent end of the grit chambers, plant recycle streams (digested solids decant from the drying beds, and underflow from the secondary clarifiers and the intermediate clarifier) blend with the raw influent flow before entering the grit chambers. Immediately downstream of the grit chambers, recycle from the two PTFs mixes with the flow leaving the grit chambers. This combined stream then flows to the two primary clarifiers.
The primary effluent further flows through the two-stage trickling filters including PTFs and STFs. The PTF stage includes two trickling filters with plastic media that operate in parallel. One PTF is followed by an intermediate clarifier that separates some of the solids to reduce the load on the STF system. A portion of the effluent from the PTFs is recirculated back through the primary clarifiers, as mentioned. The secondary stage includes two cross-flow, plastic media STFs that operate in parallel. The trickling filter effluent flows through the secondary clarifiers and a portion of the effluent is recirculated back to the secondary trickling filter pump station (STFPS) and the remainder is discharged to the percolation ponds.
There are a total of 17 percolation ponds of various sizes, with a total area of approximately 124 acres.
The ponds have various percolation rates and receive flow based on which are in operation at any given time. Flow is cycled between operating ponds. There are typically three or four ponds in drying mode preparing for discing and or re-grading.
Settled sludge and scum from the primary clarifiers is pumped to the gravity thickeners and the thickened sludge is then pumped to the digesters. Sludge removed from the intermediate clarifier and secondary clarifiers is pumped back to the grit chambers, and ultimately removed in the primary clarifiers. The digesters provide an anaerobic environment for the digestion of organic material. Digested sludge is dewatered in sludge drying beds where it can take several weeks or months to dry. Clear liquid, or supernatant from the beds is decanted back to the supernatant pit pump. Once the sludge is dried, it is removed from the sludge drying beds for disposal. Figure 1.5 shows the process flow diagram for the City’s WWTP as well as the estimated flow rates for the major process streams. Flow rates were developed based on the reported flows for the influent and thickened sludge and the design flows for the major pump stations. This information was incorporated into a preliminary process model of the WWTP, which was used to perform a flow balance of the WWTP and estimate recycle streams. The model was developed using EnviroSim’s commercially available software package, BioWin version 6.2. Appendix 1A includes a detailed summary of the WWTP’s original design criteria.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Figure 1.5 Process Flow Diagram
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
1.4 Performance Evaluation
Data from January 2018 to September 2023 was collected and analyzed to evaluate the WWTP's performance. In addition to monitoring influent data, the routine sampling includes the following constituents at the noted frequencies below:
Effluent:
» CBOD and TSS are sampled weekly.
» NH3-N, nitrate (NO3-N), nitrite (NO2-N), TKN, and total nitrogen (TN) are sampled quarterly. » Boron, chloride, sodium, total dissolved solids, sulfate, pH, and settleable solids are sampled quarterly.
Raw sludge:
» TSS and volatile suspended solids (VSS) are sampled weekly. Digested sludge:
» TSS, VSS, alkalinity, volatile acids, methane production, hydrogen sulfide, temperature, and pH are sampled weekly.
Solids hauled from the drying beds for disposal at landfill or composting operation (wet tons).
1.4.1 Permit Limits
The purpose of the City’s WWTP is to treat wastewater to a degree so that its disposal will not endanger public health or degrade groundwater quality. The degree of treatment is set by discharge requirements established by the Central Coast Regional Water Quality Control Board (RWQCB) Region 3. The 2011 treatment plant expansion allowed the City to comply with the WDR Order No. R3-2010-000, the limits of which are shown in Table 1.4.
Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) Constituent Monthly Average Daily Maximum
CBOD, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
Total Dissolved Solids(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
mL/L - milliliters per liter
(1) Compliance shall be based on a 3-year running mean.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
In June 2023, the City received a Notice of Applicability (NOA) from the RWQCB for enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements, for discharges from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd). The NOA terminated Order No. R3-2010-000. The City has been granted Interim Effluent Limits for two years, which are shown in Table 1.5. These are the same as those shown in Table 1.3, except that the effluent parameter has changed from CBOD to BOD₅. The City has requested that the RWQCB replace the BOD₅ limit for the interim period with CBOD.
After June 16, 2025, the limits in Table 1.6 will apply.
Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 Constituent Monthly Average Daily Maximum
BOD₅, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
Total Dissolved Solids(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
(1) Compliance shall be based on a three-year running mean.
Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 Constituent 30-day Average 7-day Average Sample Maximum 25-month Rolling Median(1) BOD₅, mg/L 30 45 Not Applicable -
TSS, mg/L 30 45 Not Applicable -
Settleable Solids, mL/L 0.1 0.3 0.5 -
pH between 6.5 to 8.4 Not Applicable Not Applicable -
Total Dissolved Solids, mg/L - - - 1,000
Chloride, mg/L - - - 165
Sodium, mg/L - - - 105
Sulfate, mg/L - - - 500
Boron, mg/L - - - 0.5
TN, mg/L - - - 10
Notes:
(1) Based on the Upper Guadalupe Groundwater Basin. Rolling Median is the median from all data collected over the most recent 25 months.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
1.4.2 Historical Performance
Table 1.7 provides a summary of the historical WWTP performance relative to the previous Order No. R3-2010-000 for TSS and CBOD concentrations. As can be seen, the WWTP was able to treat the influent flow and remain within the CBOD and TSS monthly average limit, however, there was one exceedance for TSS in 2019 based on the daily maximum limit. The monthly average concentrations for CBOD have increased over the last few years and the City has come close to exceeding the monthly limit in 2023. The cause for the increase is not known. The monthly average concentrations for TSS have remained consistent since 2020. Figure 1.6 presents the same information compared with monthly average and daily maximum limits for both CBOD and TSS concentrations.
Table 1.7 Summary of Historical Performance Through September 2023 Constituent Effluent Limit 2018 2019 2020 2021 2022 2023(1) CBOD, mg/L Monthly Maximum 60 42.5 42.6 41.9 45.4 45.1 50.4 Daily Maximum 100 63.3 72.6 57.7 88.0 59.0 79.0
TSS, mg/L Monthly Maximum 60 37.8 41.6 36.3 39.5 36.9 39.8 Daily Maximum 100 73.0 118.0 60.4 70.2 49.2 84.8
Notes:
(1) Includes data through September only.
Figure 1.6 Effluent TSS and CBOD
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
1.4.3 Effluent Nitrogen
The City’s WWTP is a non-nitrifying two-stage trickling filter plant, therefore, nitrogen removal is not the main aim in terms of treatment, but will be by June 2025, unless this date can be extended for a period of time. Nevertheless, removal of nitrogen to achieve the new limit of 10 milligrams nitrogen per liter as TN will be required within the next 5 to 10 years. Therefore, it is important to assess the nitrogen constituents in the effluent.
Figure 1.7 shows the effluent NH3-N, NO3-N, and NO2-N concentrations. The average NH3-N is about 30 mg/L, NO3-N is about 4.0 mg/L, and NO2-N is about 2.0 mg/L. As seen in Figure 1.6 the higher NO3-N concentrations suggest some incidental nitrification may be occurring in the process.
Figure 1.7 Effluent Ammonia, Nitrate, and Nitrite
1.4.4 Wastewater Sampling and Characterization
A wastewater sampling plan was developed as part of this effort to supplement the routinely collected data. The additional data collected is utilized to assess the current performance of the WWTP and help in better characterizing the various process streams. The results from this effort are also used to calibrate a plant process model, which is leveraged to better evaluate near-term recommendations, establish unit process capacity, and further evaluate future nitrogen removal alternatives. The wastewater sampling plan was recommended for a period of one week. City staff performed wastewater sampling from December 13 through December 19, 2023. Composite samples were collected for all liquid streams and grab samples were collected for solid streams as shown in Table 1 in Appendix 1B. Since the composite samplers were not flow paced, they were programmed with a non-uniform time-weighted frequency to simulate the approximate flow characteristics. All samples were analyzed by FGL, Inc., located in San Luis Obispo.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
Table 1.8 summarizes the results from the recommended sampling plan. The wastewater sampling data collected was generally found to be consistent during the sampling period except for a few data points.
Some of the anomalies were resolved by following up with FGL, Inc. The key findings from the wastewater sampling data analysis include:
The influent CBOD and TSS concentrations during the sampling period were lower than the average historical data. This could likely be due to two possible reasons:
» The WWTP experienced lower incoming loads during the sampling period. » The influent samples were collected as flow-based composites during the sampling period, however, historically the influent samples have been collected as time-based composites. The TSS concentrations in solids streams such as thickener underflow, digested sludge, and solids off hauled were also lower than the average historical data. This could again possibly be due to the lower incoming loads into the WWTP during the sampling period. The average influent COD to BOD₅ ratio is about 2.6, which is high compared to the typical range of
1.8 to 2.2 for municipal wastewater. The higher ratio suggests the presence of industrial waste streams or other non-municipal components in the influent.
The average particulate COD to VSS is about 2.0 which is high end of the typical range of 1.4 to 2.0.
The higher particulate COD to VSS also suggests the presence of industrial or other non-municipal components in the influent.
The influent TKN and NH3-N averages around 64 and 51 mg/L, respectively. This results in a NH3-N to TKN ratio of 0.81 which is a little bit higher than the typical range of 0.5 to 0.75. Additionally, the presence of NO3-N and NO2-N at secondary trickling filter pump station and effluent suggests that some incidental nitrification is occurring in the process. The soluble fraction for COD, BOD₅, and CBOD is in the range of 55 to 60 percent, which is higher than the typical range of 35 to 45 percent for municipal wastewater. The primary clarifiers seem to be performing well within the typical range. The TSS and BOD₅ removal is approximately 64 and 36 percent, respectively compared to the typical TSS and BOD₅ removals of 55 to 65 percent and 25 to 35 percent, respectively.
The primary trickling filters seem to be performing well based on the current organic loading excluding recycle flows.
» The CBOD removal is approximately 51 percent for PTF No. 1 based on the organic loading of 248 pounds (lbs) BOD/1,000 cubic feet (ft3)/day which is higher than the typical removal of 30 percent at the same organic loading.
» The CBOD removal is approximately 55 percent for PTF No. 2 based on the organic loading of 151 lbs BOD/1,000 ft3/day which is higher than the typical removal of 40 percent. The intermediate clarifier provides about 13 percent TSS removal. The secondary trickling filters seem to be performing below the typical based on the current organic loading. The CBOD removal is approximately 60 percent for the current organic loading of 43 lbs BOD/1,000 ft3/day which is a little bit lower than the typical removal of 70 percent at the same organic loading.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Table 1.8 Summary of Wastewater Sampling Plan Data
Sample Unit
Composite Samples(1)(2) Grab Samples(1)
Influent
Grit
Chamber
Influent
Grit
Chamber
Effluent
Primary
Clarifier
Effluent
Primary
Trickling
Filter
Pump
Station
Primary
Trickling
Filter No. 1
Effluent
Primary
Trickling
Filter No. 2
Effluent
Intermediate
Clarifier
Effluent
Secondary
Trickling
Filter Pump
Station
Secondary
Trickling
Filter No. 1
Effluent
Secondary
Trickling
Filter No. 2
Effluent
Effluent Primary
Sludge
Intermediate
Clarifier
Underflow
Secondary
Clarifier
Underflow
Thickener
Underflow
Thickener
Overflow Digester Drying Bed Supernatant
Solids
Off-Hauled(3)
Field Measurements
Flow mgd 6.6(3)
Temperature degrees Celsius 21 18.7 34.6
pH 7.6 7.8 7.0
Gas Flow scfm -- 14(3)
Unfiltered
COD mg/L 915 1,001 610 390 418 382 392 326 280 201 209 165 703 1,339 BOD mg/L 358 146 101 66
CBOD mg/L 329 326 200 141 132 115 104 70 49 49 29 235 180 TSS mg/L 232 296 168 61 71 91 87 79 55 62 56 28 2,857 746 2,126 35,714 323 15,714 51 -- VSS mg/L 210 61 70 86 87 55 59 55 2,536 693 1,926 31,629 12,414 -- TKN mg/L 64
TP mg/L 10.8 8.7
Alkalinity mg/L CaCO3 354 386 346 310 18,833
Filtered(3)
sCOD mg/L 491 476 323 270 287 236 222 182 113
sBOD mg/L 209 90 39 18
sCBOD mg/L 195 93 54 53 36 17
sTKN mg/L 53 --
Ortho-P mg/L 5.1
Filtered(4)
NH3-N mg/L 51 55 45 40
NO3-N mg/L 0.2 0.1 1.3 3.3
NO2-N mg/L 0.0 0.03 1.3 2.4
TN mg/L 54 48 43
Flocculated/Filtered(5)
ffCOD mg/L 262
Notes:
(1) Average of one-week sample period (December 13 through 19, 2023). (2) Composite samples were time-based on December 13 and 14, and flow-based from December 15 to 19. (3) Based on routine sampling.
(4) Filtered through 1.2 to 1.5 micron glass fiber filter (the same as those typically used to measure plant TSS/VSS). Filtration should occur immediately after collection before samples are shipped. (5) Filtered through 0.45 micron Millipore filter. Filtration should occur immediately after collection before samples are shipped. Prior to filtration, filters should be triple rinsed with deionized water. (6) Sample preparation per Mamais et al., 1993.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
The VSS to TSS ratio was consistent for primary sludge and was approximately 90 percent. However, there was a lot of variation in the TSS and VSS data for the sampling period. The VSS to TSS ratio was also consistent for thickened sludge and was approximately 90 percent. The TSS and VSS data were mostly consistent for the sampling period except for one day (December 13, 2023).
The VSS to TSS ratio was also consistent for digested sludge and was approximately 75 percent. The TSS and VSS data were fairly consistent throughout the sampling period.
The results from the wastewater sampling were used to evaluate performance and develop unit process ratings discussed in Section 1.4.5 and calibrate a process model discussed in Section 1.5.
1.4.5 Unit Process Evaluation
An understanding of the WWTP's unit process performance is critical to evaluating WWTP's performance.
The historical load and performance of each unit process was compared to the original design criteria and typical anticipated performance. The performance of each unit process provides a benchmark for the planning of new facilities and assessing capacity. Table 1.9 summarizes the results of the performance evaluation for City’s WWTP based on the historical as well as additional data collected during the wastewater sampling event. The rest of this section provides a focused discussion of the operating conditions and performance for the primary, secondary, and solids handling processes.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
Table 1.9 Unit Process Performance
Process/Parameter Original Design Capacity or Rating Source Average Performance From 2018 - Present(1) MOP 8(2) or Typical Values Recommended Operation for Performance Assessment
Influent Flow
AA, mgd 12.5 O&M Manual 7.3 Variable Projections to be developed MM, mgd 13.5 O&M Manual 8.1 Variable Projections to be developed PH, mgd 24.0 O&M Manual To be developed after receiving hourly data Variable Projections to be developed Primary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 379 O&M Manual 224 800 - 1,200 379 Overflow Rate at AA Flow With Recirculation,
gpd/ft2
925 O&M Manual 694 800 - 1,200 925
BOD5 Percent Removal 36 O&M Manual 30 30 - 35 30
TSS Percent Removal 54 O&M Manual 64 60 - 65 64
PTFPS
Flow Rate, mgd 19.5 O&M Manual 19.5 Variable 19.5
PTF No. 1
Flow Rate, mgd 11.7 O&M Manual 11.7 Variable 11.7
Hydraulic Loading, gpm/ft2 2.9 O&M Manual 2.9 1 - 3 (Roughing)
0.3 - 1.5 (CBOD and Nitrifying)
2.9 Recirculation Ratio at AA Flow 0.67 O&M Manual 0.67 Variable, hydraulic and organic loading more critical
0.67 BOD5 Loading, lbs/1,000 ft3/day 385 with recycle
365 without recycle
O&M Manual 380 with recycle
248 without recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
248
Distributor Rotational Speed, secs/rotation 30 - 60 O&M Manual 45 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 30 - 60 Calculated based on Distributor Rotation and Flow Rate
45 Depends on BOD5 Loading, 200 -
600 mm/rotation recommended for BOD5
loading 200 lbs/1,000 ft3/day
200
Performance for BOD5 Removal, % 35 with recycle
55 without recycle
O&M Manual 13 with recycle
51 without recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
51 PTF No. 2
Flow Rate, mgd 7.8 O&M Manual 7.8 Variable 7.8
Hydraulic Loading, gpm/ft2 1.9 O&M Manual 1.9 1 - 3 (Roughing)
0.3 - 1.5 (CBOD and Nitrifying)
1.9 Recirculation Ratio at AA Flow 1.0 O&M Manual 1.0 Variable, hydraulic and organic loading more critical
1.0 BOD5 Loading, lbs/1,000 ft3/day 255 with recycle
250 without recycle
O&M Manual 253 with recycle
151 without recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
151
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17
Process/Parameter Original Design Capacity or Rating Source Average Performance From 2018 - Present(1) MOP 8(2) or Typical Values Recommended Operation for Performance Assessment
Distributor Rotational Speed, secs/rotation 60 O&M Manual 150 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 40 Calculated based on Distributor Rotation and Flow Rate
100 Depends on BOD5 Loading, 200 -
600 mm/rotation recommended for BOD5
loading 200 lbs/1,000 ft3/day
150
Performance for BOD5 Removal, % 35 with recycle
74 without recycle
O&M Manual 21 with recycle
55 without recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
55 Intermediate Clarifier
Flow Rate, mgd 3.6 O&M Manual 3.5 Variable 3.5
Nominal Overflow Rate at AA Flow, gpd/ft2 935 O&M Manual 909 800 - 1,200 909 STFPS
Flow Rate, mgd 23 O&M Manual 23 Variable 23
STFs
Hydraulic Loading, gpm/ft2 0.31 O&M Manual 0.31 1 - 3 (Roughing)
0.3 - 1.5 (CBOD and Nitrifying)
0.31 Recirculation Ratio at AA Flow 0.46 O&M Manual 0.68 Variable, hydraulic, and organic loading more critical
0.46 BOD5 Loading, lbs/1,000 ft3/day 111 with recycle
75 without recycle
O&M Manual 73 with recycle
43 without recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
43 Distributor Rotational Speed, secs/rotation 150 - 180 O&M Manual 150 (July 19-20, 2023, visit) Variable 480 SK, mm/rotation -- -- 15 - 20 Depends on BOD5 Loading, 100 - 300 mm/rotation recommended for BOD5
loading 100 lbs/1,000 ft3/day
50 Performance for BOD5 Removal, % 56 without recycle -- 60 without recycle 40 - 70% BOD5 Removal (Roughing) < 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
60 Secondary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 400 O&M Manual 240 400 - 800 400 Overflow Rate at AA Flow with Recirculation,
gpd/ft2
750 O&M Manual 750 800 - 1,200 750
Gravity Thickeners
Hydraulic Loading, gpd/ft2 462 O&M Manual 338 500 - 750 462 Solids Loading, lbs BOD5/1,000 ft2/day 24 O&M Manual -- 12 - 20 12 - 20 Solids Loading, lbs TSS/ft2/day 14.2 -- 9.3 <22 9.3
Thickened Sludge TSS, % 6.5 O&M Manual 4.5 5 - 9 4.5
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-18
Process/Parameter Original Design Capacity or Rating Source Average Performance From 2018 - Present(1) MOP 8(2) or Typical Values Recommended Operation for Performance Assessment
Digesters
HRT, days 20 O&M Manual 20.5 15 day minimum for single-stage mesophilic digesters (Class B)
20 Percent TS -- -- 2.3 1.5 - 2.5 Developed for Capacity Evaluation Percent VS -- -- 1.6 1.0 - 1.7 Developed for Capacity Evaluation VSS Loading, lbs/ft3/day 0.10 - 0.15 O&M Manual 0.12 0.15 - 0.20 0.15 - 0.20 VS Reduction, % 55% O&M Manual 58 Minimum 38 percent for Class B Minimum 38 percent for Class B Volatile Acids, mg/L 50 - 500 O&M Manual 147 500 Maximum 500 Maximum Alkalinity, mg/L as CaCO3 1,500 - 3,000 O&M Manual 3,404 1,500 - 5,000 1,500 - 5,000 Volatile Acids/Alkalinity Ratio -- -- 0.043 0.10 - 0.35 0.10 - 0.35 pH 6.8 - 7.4 O&M Manual 7.0 6.8 - 7.2 6.8 - 7.2
Gas Production, ft3/day -- -- 151,000 Variable Variable Gas Production, ft3/lb VS removed 12 - 17 O&M Manual 16.3 12 - 18 12 - 18 Sludge Drying Beds
Solids Loading, lbs/day 15,700 O&M Manual 11,000 Variable 15,700 Solids Loading, lbs/ft2/year 10.9 O&M Manual 7.6 15 to 25 (typical) 11 Solids Off Hauled From Beds (Wet
Tons/year)
-- -- 19,660 Variable --
Percent TS Off Hauled 60% O&M Manual 70% reported 50 to 90% 70 Notes:
CaCO₃ - calcium carbonate; HRT - hydraulic residence time; mm - millimeter; PTFPS - primary trickling filter pump station; TS - total solids; VS - volatile solids (1) Includes data through September only.
(2) Design of Water Resource Recovery Facilities, MOP8.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19
1.4.5.1 Primary Treatment
The primary treatment system includes both clarification and biological treatment. Primary clarifiers remove settleable solids and floatable from wastewater through quiescent conditions that allow sedimentation of heavier particles (sludge) and flotation of lighter solids (scum). Effluent from both primary clarifiers is pumped to both PTFs through the PTFPS. When influent flows to the plant are above
3.9 mgd, the total primary clarifier effluent will exceed 19.5 mgd. The excess flow to the PTFPS falls over a weir, mixes with intermediate clarifier effluent, and then flows to the secondary treatment process. The settled primary sludge is pumped to the gravity thickeners.
Primary Clarifiers
Following preliminary treatment, the primary influent flow is combined with recycle flow from the PTFs in the mixing box at the outlet end of the grit chamber. The primary influent also includes sludge from the intermediate and secondary clarifiers, which are returned to Junction Box C upstream of the grit chamber.
The settled primary sludge is moved inward toward the sludge pocket in the clarifier bottom by two rows of angled scrapers, one row mounted on each arm of the continuously rotating clarifier sweep mechanism. The primary sludge is withdrawn continuously by the primary sludge pumps which transfer it to the gravity thickeners.
Surface overflow rate (SOR) is a key parameter used for design and assessment of primary clarifiers.
Figure 1.8 shows the SOR for the primary clarifier at WWTP for the evaluation period. SOR for primary clarifiers was calculated using the average daily flow for the evaluation period and a constant recycle flow of 16 mgd. As seen in Figure 1.8, the SOR for primary clarifiers is below the average design value and well within the typical SORs for primary clarifiers. The average CBOD and TSS removal during the sampling period was 30 and 64 percent, respectively. The performance of the primary clarifier is also well within the typical range of 30 to 35 percent CBOD and 60 to 65 percent TSS removal.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20
Figure 1.8 Surface Overflow Rates for Primary Clarifiers Primary Trickling Filters
Both primary clarifiers discharge effluent through a common pipe to the PTFPS wet well. The pumping rate for PTF No. 1 is 11.7 mgd and for PTF No. 2 is 7.8 mgd. A portion of the flow from PTF No. 1 goes to an Intermediate Clarifier, discussed below, and the remainder is recycled, together with all flow from PTF No. 2.
The distributed wastewater trickles slowly down through the 12-foot depth of plastic media. The type of plastic media is not indicated in the O&M manual, although most plastic media for this type of filter would be a vertical configuration.
The trickling filters are typically characterized based on three parameters: BOD₅ removal efficiency, hydraulic loading, and organic loading. Both PTF No. 1 and PTF No. 2 have very high hydraulic and organic loadings (2.9 and 1.9 gpm/ft2; and 385 and 285 lbs BOD₅/1,000 ft3/day respectively) based on the design criteria and are therefore classified as “roughing” filters. Note that the organic loadings in the design criteria are calculated including recycle. The rotational speed for the distributor arm results in a SK value ranging from 45 to 100 mm/rotation. This is a measure of the amount of water applied per 1 revolution of the distributor arm. For trickling filters operating at such a high loading rate, a minimum SK value of 200 to 600 mm/rotation is recommended to maintain healthy biology. With too low of a SK alue, the trickling filter may be more susceptible to experiencing poor hydraulic distribution and flushing, which could result in septic conditions within the unit. Increasing the SK value can be achieved by reducing the rotational speed of the distributor.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21
The filters are designed to achieve 35 percent BOD₅ removal and no nitrogen removal. Based on the wastewater sampling, the organic loading excluding recycle for PTF No. 1 and No. 2 is 248 and 151 lbs BOD₅/1,000 ft3/day, respectively. The organic loading with recycle for PTF No. 1 and No. 2 is 380 and 253 lbs BOD₅/1,000 ft3/day. The average CBOD removal for PTF No. 1 and No. 2 from the sampling plan is 51 and 55 percent, respectively.
Intermediate Clarifier
The Intermediate Clarifier is unique in that it only receives flow from PTF No. 1 and is the only clarifier at this treatment plant which does not have scum collection or removal equipment. All floatable material, which may be present in the intermediate clarifier will pass over the effluent weir and ultimately be removed in the secondary clarifiers.
Up to 3.9 mgd of the effluent from PTF No. 1 is sent to the intermediate clarifier to remove settleable solids. The clarified effluent from the intermediate clarifier flows through a 24-inch pipe to a small box at the outlet side of the PTFPS, where it is combined with the portion of the primary clarifier effluent which has not been pumped to either PTF.
The intermediate clarifier provides only 13% TSS removal and therefore, it is not performing well. As mentioned, this is probably as a result of the poor settling characteristic of the primary trickling filter solids.
1.4.5.2 Secondary Treatment
The secondary treatment system consists of two STFs, two secondary clarifiers, a STFPS, secondary pump station, and percolation ponds. Secondary treatment is a biological process that removes CBOD and TSS from the wastewater to meet regulatory requirements. Based on the O&M manual, at the end of the secondary process, more than 80 percent of the CBOD and TSS in the raw wastewater have been removed. The plant effluent is then discharged to percolation ponds, where the water is returned to the groundwater basin.
Secondary Trickling Filters
The STFs receive flow from the STFPS. The feed is a mixture of bypass flow from the PTFPS and overflow from the Intermediate Clarifier. The flow is distributed evenly over both STFs through rotary distributor arms. The filters are filled with modular plastic cross-flow media at a depth of 3.33 feet. As water flows through the filter media, biological organisms growing on the media draw remaining organic material from the wastewater and convert it to settleable solids.
To maintain the required wetting rate on the STFs, a portion of the secondary clarifier effluent is recycled to the pump station. The amount of recycled secondary effluent decreases as primary effluent flow increases.
With a design hydraulic loading rate of 0.31 gpm/ft2 and an organic loading rate (including recycle) of 111 lbs BOD₅/1,000 ft3/day, the STFs (like the PTFs) are classified in the high-rate range. The current hydraulic loading for the STFs is estimated to be 0.33 gpm/ft2, which is on the low range of the recommended hydraulic loading rate. Insufficient wetting rates could result in poor hydraulic distribution within the media, and reduced performance. The secondary distributors rotate at 2.5 to 3 minutes per revolution, which results in a SK value of 15 to 20 mm/rotation. At the design organic loading rate, the TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22
recommended SK value is 100 to 300 mm/rotation. Like the PTFs, the secondary filters may benefit from reducing the distributor rotational speed.
The average organic loading (excluding recycle) for STFs is 43 lbs BOD₅/1,000 ft3/day and the average CBOD removal (excluding recycle) is 60 percent.
Secondary Clarifiers
The secondary clarifiers provide quiescent conditions for the sludge to settle and scum to float to the surface. Secondary clarifier effluent flow that is not recirculated back to the STFs is discharged to the percolation ponds. Settled secondary sludge or scum collected in the secondary clarifiers is pumped back to upstream of the grit chambers. The secondary clarifiers are operating at their design SOR rate of 750 gpd/ft2 (including recirculation), which is well within typical rates for clarifiers.
The secondary clarifiers are shallow with a depth of 10 ft. Typical depth for secondary clarifiers range from 14 to 16 ft. The shallow secondary clarifiers are suitable for a two-stage trickling filter process since the solids loading is typically lower than an activated sludge process.
1.4.5.3 Solids Handling
The solids handling system includes sludge and scum pumping, sludge thickening, sludge digestion, digested sludge settling, drying, and disposal. The purpose of the gravity thickeners is to receive all sludge pumped from the primary clarifier and provide quiescent conditions during which the sludge and scum will thicken until a concentration of solids is reached which is suitable for addition to the digesters, typically in the 3 to 5 percent range.
The purpose of the digesters is to retain the digesting sludge under anaerobic conditions for a minimum period in order to stabilize the biosolids sufficiently for disposal.
Gravity Thickeners
The gravity thickeners receive all the sludge pumped from the primary clarifiers. Gravity thickeners are evaluated based on hydraulic loading and solids loading. The current hydraulic loading rate for the gravity thickeners is approximately 338 gpd/ft2 compared to the design hydraulic loading rate of 462 gpd/ft2. The design organic loading rate is 24 lbs BOD₅/ft3/day. The thickened sludge is pumped to the digesters and the clarified thickener overflow is returned to the PTFPS.
Figure 1.9 shows the thickened sludge flow which is pumped to the digesters and Figure 1.10 shows the percent TS for thickened sludge during the evaluation period. The target percent TS for thickened sludge is 6.5 percent. However, for the evaluation period, the average percent TS for thickened sludge is about
4.5 percent as shown in Figure 1.10. While the overflow rate is below the design value and within typical rates for a thickener. The solids loading rate is approximately 9.3 lbs TSS/ft2 /day, which is below the
design rate of 14.2 lbs/ft2/day and well below the maximum loading rate of 22 lbs TSS/ft2/day.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23
Figure 1.9 Thickened Sludge Flow Rate
Figure 1.10 Thickened Sludge Total Solids Concentration TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24
Digesters
The anaerobic digestion of sludge by bacteria is a sequential process. The first stage is acid fermentation, and the second stage is methane fermentation. The organic acids produced during acid fermentation are subsequently utilized by bacteria resulting in release of methane and carbon dioxide gas. Both stages occur in the single stage mesophilic digesters operated by the City.
Stabilization of the sludge is accomplished during the methane fermentation stage. In this stage, the organic acids produced during acid fermentation are converted to methane and carbon dioxide resulting in a reduction of the organic material in the system.
VS loading and the HRT are key parameters used for assessing performance. The design HRT for the digesters at the WWTP is about 20 days. For the evaluation period, only two out of four digesters were in operation (No. 1 and No. 3). The average HRT for Digesters No. 1 and No. 3 is similar and approximately 20 days. Figure 1.11 shows the daily average HRTs for Digesters No. 1 and No. 3. While the average is above the regulatory required minimum HRT of 15 days to achieve a Class B biosolids, there are periods where the HRT approaches 15 days. This likely due to the lower percent solids of the thickened feed from the gravity thickeners (4.5 percent versus 6.0 percent).
Figure 1.11 Anaerobic Digester Hydraulic Retention Time VS loading rate for the evaluation period was about 0.12 lbs/ft3/day as shown in Figure 1.12. Typical values for VSS loading ranges from 0.12 to 0.16 lbs/ft3/day. The VSS loading is below the recommended maximum range of 0.15 to 0.20 lbs/ft3/day.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-25
Figure 1.12 Anaerobic Digester Volatile Solids Loading Rate Apart from the HRT and VSS loading, other operational parameters used to assess their health are illustrated in Figure 1.13 through Figure 1.19 below. In general, all of the parameters evaluated indicate the digesters are performing well and within their design and typical values. The typical maximum operating range for all the parameters is shown in the grey shaded zone.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
Figure 1.13 Anaerobic Digester pH
Figure 1.14 Anaerobic Digester Volatile Acids
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
Figure 1.15 Anaerobic Digester Alkalinity
Figure 1.16 Anaerobic Digester Gas Production
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28
Figure 1.17 Anaerobic Digester Temperature
Figure 1.18 Anaerobic Digester Volatile Solids Reduction TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29
Figure 1.19 Anaerobic Digester Volatile Acids/Alkalinity Ratio Sludge Drying Beds
Digested sludge is transferred from the digesters to drying beds. Each of the sludge beds is equipped with overflow rings that are used to decant clear liquid from the beds back to the decant pump at Supernatant Pit No. 1. By decanting clear liquid, the drying time in the bed can be reduced. The City’s WWTP has about 18 drying beds that cover 12 acres of land. The design solids loading rate is
10.9 lbs/ft2/year. Based on the reported digested sludge quantity and characteristics, the average solids loading during the review period is calculated to be 7.6 lbs/ft2/year and should have capacity to accommodate more sludge. Note that during wet years, the available capacity may be less. Reported TS concentration off hauled from the drying beds is 70 percent.
1.5 Process Modeling
A steady state plant wide model was developed using BioWin version 6.2 (Envirosim) to help evaluate the current performance, near-term recommendations, establish unit process capacity, and evaluate future nitrogen removal alternatives. Figure 1.20 shows a process flow schematic developed in BioWin for the WWTP.
The model was developed using custom-configured unit process modules that reflect the existing configuration and operation at the City’s WWTP. Physical dimensions (volume, area, and depth) of each unit process and flow rates for all process streams were used as inputs for the model. Historical operational data and data collected from the wastewater sampling plan were used to calibrate the model.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-30
Figure 1.20 Process Model for City’s WWTP
The BioWin model utilizes COD modeling which uses influent COD data as an input as well as various COD fractions such as readily biodegradable, acetate, non-colloidal slowly biodegradable, unbiodegradable soluble, and unbiodegradable particulate. Constituents such as CBOD and TSS are calculated based on the influent COD and specified wastewater fractions.
Based on the sampling plan data, the COD to BOD₅ and COD to CBOD ratio in the influent was higher than the typical range for municipal wastewater. Therefore, three different process modeling approaches were used to match the influent wastewater characteristics and current plant performance.
The first approach focused on matching the influent COD concentrations while modifying wastewater fractions calculated from the sampling plan only. Since the COD to CBOD ratio during the sampling period was higher than the typical range, it was difficult to match the influent CBOD for this approach without calibrating additional parameters.
The second approach focused on matching influent COD, CBOD, and TSS concentrations while modifying wastewater fractions calculated from the sampling plan as well as additional parameters to help calibrate the influent wastewater characteristics and current plant performance. This approach provided a good match on the influent and secondary trickling filter performance; however, it didn’t provide a good match for the primary trickling filter performance. This approach provided an insight into the overall performance of the City’s WWTP. Based on the sampling plan results and model prediction results from approach 2 it was concluded that the primary trickling filters are performing better than their design values while the secondary trickling filters are performing worse than their design values.
To mimic the above conclusion, the third approach focused on matching the primary and secondary trickling filter performance by modifying the specific area for both primary and secondary trickling filters which directly affects the performance of the trickling filters.
The calibrated parameters for each of the approaches are listed in Table 1.10.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31
Table 1.10 Process Model Calibration Parameters
Parameter Default / Design Approach 1 Approach 2 Approach 3 Fbs - readily biodegradable COD (including
acetate)
0.16 0.35 0.35 0.35
Fus - unbiodegradable soluble 0.05 0.1 0.1 0.1
Fna - ammonia 0.66 0.81 0.81 0.81
Fpo4 - phosphate 0.50 0.48 0.48 0.48
Particulate COD:VSS 1.63 2.00 2.00 2.00
BOD calculate rate constant for Xsc degradation 0.5 0.5 0.1 0.1 BOD calc rate constant for Xsp degradation 0.5 0.5 0.1 0.1 PTF No. 1 Specific Area, ft2/ft3 27 27 27 105
PTF No. 2 Specific Area, ft2/ft3 42 42 42 85
STF No. 1 and No. 2 Specific Area, ft2/ft3 42 42 42 18
Table 1.11 provides the model outputs for each of the three approaches. As described earlier, approaches 1 and 2 do not match the primary trickling filter performance and approach 3 matches the overall plant performance. A few observations worth noting from model calibration are:
For approach 2, the BOD rate constants had to be modified significantly. The BOD rate constant account for BOD inhibition due to additional non-municipal influent load? Approach 2 matches the sampling period data for most of the key process streams and parameters except for PTF No. 1 and No. 2 effluent.
For Approach 3, the specific areas for PTFs and STFs had to be modified significantly to match the performance.
Approach 3 matches the sampling period data the best (<10% difference) for key process streams and parameters.
For each of the approaches the model predicted higher total solids (lbs/day) loading for sludge thickeners and anaerobic digesters compared to the data collected from the sampling plan. However, when compared to the historical data, the thickened sludge and digested sludge data better matches the model outputs. Since the primary, thickened, and digested sludge samples were analyzed as grab samples, it is possible that the data collected from the sampling period is not representative of the actual total solids loading. Furthermore, both primary, thickened, and digested sludge data showed a lot of variation during the sampling period.
The process model was used to evaluate the benefit of improving primary and secondary clarifier performance. For the purposes of this evaluation, either Approach 2 or 3 could be used to determine the benefits of different optimization elements as they predict the same relative improvements. The results from various recommended optimization elements are described in Section 1.6.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
Table 1.11 Process Model Calibration Summary
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Influent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 915 915 915 915
CBOD, mg/L 317 447 320 320
TSS, mg/L 232 249 243 243
TKN, mg/L 64 64 64 64
Grit Chamber Influent
Flow, mgd 7.23 7.23 7.23 7.23
COD, mg/L 1,001 1,004 1,026 993
CBOD, mg/L 326 500 367 349
TSS, mg/L 296 369 349 323
Grit Chamber Effluent
Flow, mgd 23 23 23 23
COD, mg/L 610 642 626 538
CBOD, mg/L 200 305 239 180
TSS, mg/L 168 184 170 174
Primary Effluent
Flow, mgd 23 23 23 23
COD, mg/L 390 465 459 368
CBOD, mg/L 141 228 194 133
TSS, mg/L 61 68 63 64
CBOD Removal, % 30 27 21 28
TSS Removal, % 64 64
PTFPS
Flow, mgd 23 23 23 23
COD, mg/L 418 481 465 374
CBOD, mg/L 132 236 361 268
TSS, mg/L 71 78 67 68
PTF No. 1 Effluent
Flow, mgd 11.7 11.7 11.7 11.7
COD, mg/L 382 472 457 350
CBOD, mg/L 115 225 188 110
TSS, mg/L 91 91 80 100
CBOD Removal, % 51 55 35 56
Organic Loading, lbs BOD₅/1,000 ft3/day 248 244 309 267 TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 PTF No. 2 Effluent
Flow, mgd 7.8 7.8 7.8 7.8
COD, mg/L 392 448 432 314
CBOD, mg/L 104 209 174 96
TSS, mg/L 87 109 98 113
CBOD Removal, % 55 43 40 62
Organic Loading, lbs BOD₅/1,000 ft3/day 151 148 126 86
Intermediate Clarifier Effluent
Flow, mgd 3.4 3.4 3.4 3.4
COD, mg/L 326 465 449 341
TSS, mg/L 79 87 75 94
TSS Removal, % 13 9 10 10
STFPS
Flow, mgd 21 21 21 21
COD, mg/L 280 262 255 222
CBOD, mg/L 70 98 82 59
TSS, mg/L 55 52 47 45
STF No. 1 and No. 2 Effluent
Flow, mgd 21 21 21 21
COD, mg/L 205 216 208 198
CBOD, mg/L 49 60 50 45
TSS, mg/L 59 81 75 58
CBOD Removal, % 60 74 74 63
Organic Loading, lbs BOD₅/1,000 ft3/day 43 80 35 42
Effluent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 165 156 153 154
CBOD, mg/L 29 32 27 28
TSS, mg/L 28 37 34 27
NH3-N, mg/L 37 48 48 49
NO3-N, mg/L 2.4 0 0 0
NO2-N, mg/L 3.3 0 0 0
TIN, mg/L
Primary Sludge
Flow, mgd 0.65 0.65 0.65 0.65
TSS, mg/L 2,857 4,198 3,880 3,977
TSS, lbs/day 15,489 22,760 21,032 21,560
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Thickener Underflow
Flow, mgd 0.06 0.06 0.06 0.06
% TS 3.6 4.5 4.4 4.5
TS, lbs/day 17,871 22,346 21,797 22,344
Digested Sludge
Flow, mgd
% TS 1.6 2.2 2.1 2.2
TS, lbs/day
% VS 0.69 0.76 0.79 0.79
HRT, days 19 19 19 19
VS Removed, % 58 58 58 58
VS Removed, lbs/day 10,406 10,540 10,575 10,861
Gas, scfm 79 131 133 133
Gas, scf/lbs VS Removed 17 18 18 18
Solids to Beds
TS, lbs/day 10,204 9,669 9,883
Solids Off-Hauled from Beds
TS, lbs/day 9,694 9,476 9,685
1.6 Optimization Elements
Based on the performance assessment and several conversations with the City, effluent CBOD has increased in 2023 and brought the City very close to exceeding the monthly CBOD limit. This section summarizes preliminary results of the performance assessment and various optimization elements for improving the performance of the existing system.
1.6.1 Influent Loading
While the influent loading is still within the plant’s original design basis, concentrations are significantly higher than the original design. In addition, higher flows the last two years have resulted in a significant increase in influent loads. While the source of the loading increase is not known (i.e., growth, increased septage, or increased landfill leachate), increased loadings on a fixed film process generally result in lower BOD₅ removal rates. The team should better characterize the loading impact of septage and leachate to determine if this is a contributing factor in recent performance changes. If so, the City may want to consider reducing or eliminating septage or leachate.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-35
1.6.2 Primary Clarifiers
Reduced performance increases the solids loading on the PTFs, which can reduce their BOD₅ removal efficiency. Although, as mentioned in previous sections, primary clarifier performance is well within the typical range for both CBOD and TSS removals. However, improving the primary clarifier performance would reduce organic loading on both PTFs and STFs and therefore, reduce CBOD and TSS concentrations in the effluent. The process model was used to analyze the benefit of improving primary clarifier performance. Figure 1.21 shows the reduction in effluent CBOD and TSS concentrations with improved primary clarifier performance. However, the modeling results should be confirmed with jar testing.
Recently conducted jar testing indicates that ferric chloride addition can reduce the BOD₅ and TSS loading on the PTFs.
Figure 1.21 Primary Clarifier Performance Improvement
1.6.3 PTFs
The PTFs are very highly loaded and have a design organic loading of 255 to 385 lbs BOD₅/1,000 ft3/day.
This is higher than the typical range of 100 to 300 lbs BOD₅/1,000 ft3/day for roughing filters. A potential area of optimization would be to modify the distributor arm operation. If the trickling filter distributor arm is rotating too quickly, hydraulic short-circuiting can occur and biomass growth may not be adequately flushed, which can contribute to septicity and reduced performance. A preliminary review of the SK values based on the design organic loading indicates the distributors on the PTFs are rotating much faster than typical recommended rates.
Based on the wastewater sampling event, the organic loading for PTF No. 1 and No. 2 is 248 and 151 lbs BOD₅/1,000 ft3/day. The recommended SK values for PTF No. 1 is 200 to 600 mm/pass and for TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36
PTF No. 2 is 150 to 450 mm/pass. Based on the recommended values, the distributor rotation time for PTF No. 1 and No. 2 is approximately 4 minutes. Additionally, for proper flushing, the recommended distributor rotation time for PTF No. 1 and No. 2 is approximately 11 minutes and the recommended daily flushing time is an hour. Detailed calculations for recommended distributor rotation times are shown in Appendix 1C. To optimize performance, the rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units.
1.6.4 STFs
The STFs are designed with an organic loading of 111 lbs BOD₅/1,000 ft3/day, which is more lightly loaded than the PTFs. Similar to the PTFs, the distributors on the STFs are rotating much faster than typical recommended rates.
Based on the wastewater sampling event, the organic loading for STF No. 1 and No. 2 is 40 lbs BOD₅/1,000 ft3/day. The recommended SK values for STF No. 1 and No. 2 is 50 to 150 mm/pass.
Based on the recommended values, the distributor rotation time for STF No. 1 and No. 2 is approximately 8 minutes. Additionally, for proper flushing, the recommended distributor rotation time for STFs No. 1 and No. 2 is approximately 23 minutes and the recommended daily flushing time is an hour. Detailed calculations for recommended distributor rotation times are shown in Appendix 1C. To optimize performance, the rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units.
The wetting rate for the STFs is 0.3 gpm/ft2, which is on the low end of what is typically recommended for this type of filter (0.3 to 1.5 gpm/ft2). Increasing the feed pumping rate and the wetting rate may improve flushing, oxygen transfer, and overall performance.
1.6.5 Secondary Clarifiers
Since a portion of the effluent BOD5 is particulate, improving clarifier performance should reduce effluent BOD5 too. Based on the wastewater sampling results, the average CBOD and TSS removal is 40 and 55 percent. The secondary clarifier performance can be improved which will help reduce the effluent BOD₅ concentration. The process model was utilized to analyze the benefits of improving secondary clarifier.
Figure 1.22 shows the reduction in effluent CBOD and TSS concentrations with improved secondary clarifier performance.
The City should consider the addition of a suitable polymer ahead of the secondary clarifiers to help reduce effluent TSS and CBOD concentrations. However, the modeling results should be confirmed with jar testing. Preliminary jar testing results showed floc formation and improved settleability. Additional pilot testing might help confirm the benefits.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-37
Figure 1.22 Secondary Clarifier Performance Improvement
1.6.6 Gravity Thickeners
Reduced thickener performance (i.e., poor solids capture) may result in a large amount of solids in the supernatant, which could adversely affect liquid stream performance. The thickened sludge concentration is lower than the design target and typical ranges. Optimizing performance and increasing the thickened sludge concentration can translate to additional digester capacity, if needed.
1.7 Recommendations and Next Steps
If the proposed optimizations in this section do not result in improved effluent quality, the City will need to consider other more capital-intensive alternatives. Potential improvements could include:
Replace trickling filter media.
Construct another trickling filter.
Modify process with the addition of aerated solids contact tanks to improve settleability and clarifier performance and reduce effluent suspended solids, including particulate BOD5. Add tertiary effluent filters.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX 1A DESIGN CRITERIA
1A-1
Table 1A.1 Design Criteria
Item Values
Flows, mgd AA 12.5 MM 13.5 PH 24.0
Septage Contribution
Flow, gpd 65,000
BOD₅, mg/L 8,000
TSS, mg/L 13,500
Influent Loading
BOD₅
AA, mg/L 317
AA, lbs/day 33,050
MM, mg/L 346
MM, lbs/day 39,000
TSS
AA, mg/L 322
AA, lbs/day 33,600
MM, mg/L 380
MM, lbs/day 42,800
Primary Clarifiers
Number2
Diameter, feet 145
Depth, feet 10
Area, each, ft
2 16,505
Total Area, ft
2 33,009
Nominal SOR at AA Flow, gpd/ft
2 379
SOR with recycle, gpd/ft
2 925
Primary Effluent BOD
5 at AA Flow, lb
s/day 21,704
BOD
5 Removal, % 34.33%
Primary Sludge Pumping, gpm 300 PTFs
Number 2
Diameter, feet 60
Depth, feet 12
Media ft
2 /ft
3 25
Media type plastic
Area, each, ft
2 2,826
Area, total, ft
2 5,652
Media Volume, each, ft
3 33,912
Media Volume, total, ft
3 67,824
1A-2
Item Values
PTF No. 1
Pumped Flow, mgd 11.7
Hydraulic Loading, gpm/ft
2 2.9
lbs BOD₅/1,000 ft
3 /day 385.0
Influent BOD
5, lb
s/day 13,056
Influent BOD
5, mg/L 133.8
PTF No. 2
Pumped Flow, mgd 7.8
Hydraulic Loading, gpm/ ft
2 1.9
lbs BOD₅/1,000 ft
3 /day 255
Influent BOD
5, lb
s/day 8,648
Influent BOD
5, mg/L 133
Intermediate Clarifier
Number1
Flow, mgd 3.6
Overflow Rate, gpd/ft
2 935
Area, ft
2 3,850
Diameter, feet 70
Detention Time, hours2
Depth, feet 10
Sludge Pumping Rate, gpm 100
STFs
Number2
Diameter, feet 180
Depth, feet3
Media, ft
2 /ft
3 31
Media Type cross-flow
Area, each, ft
2 25,434
Area, total, ft
2 50,868
Media Volume, each, ft
3 84,695
Media Volume, total, ft
3 169,390
Pumped Flow, each, mgd 12
Hydraulic Loading, gpm/ft
2 0.31
Organic Loading, lbs BOD₅/1,000 ft
3 /day 111
Influent BOD
5, lb
s/day 5,646
Influent BOD
5, mg/L 29
Secondary Clarifiers
Number2
Diameter, feet 140
Area, each, ft
2 15,386
Area, total, ft
2 30,772
SOR, gpd/ ft
2 747
Depth, feet 10
1A-3
Item Values
Secondary Sludge Pumping, gpm 300
Design Percent TSS 0.50%
Sludge Thickeners
Number 2
Diameter, feet 35
Depth, feet 13
Area, each, ft2 962
Detention Time, hours 5
Hydraulic Loading, gpd/ft2 462
Solids Loading, lbs BOD₅/ ft3/day 24
Target Thickened Sludge, Percent TS 6.50%
Digesters
Number 1
Diameter, feet 65
Depth, feet 26
Volume, ft3 92,876
Number 2
Diameter, feet 50
Depth, feet 24
Volume, ft3 47,112
Number 1
Diameter, feet 65
Depth, feet 23
Volume, ft3 82,300
Total Volume 1-4, ft3 269,400
Total Volume Largest Out of Service, ft3 176,524
VSS Loading 0.15 to 0.20
Hydraulic Detention Time (days) 20
Sludge Drying Beds
Number 18
Area, each, acres 1
Total Area, acres 12
Solids Loading, lbs/ft2/year 11
Solids Loading, lbs/day 15,688
Notes:
AA - annual average; BOD₅ - 5-day biochemical oxygen demand test; ft2 - square feet; ft3 - cubic feet; gpd - gallons per day; gpm - gallons per minute; lbs - pounds; mg/L - milligrams per liter; mgd - million gallons per day; PH - peak hour; PTFs - primary trickling filters; MM - maximum month; SOR - surface overflow rate; STFs - secondary trickling filters; TSS - total suspended solids; VSS - volatile suspended solids TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX 1B RECOMMENDED SAMPLING PLAN
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS JUNE 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1B-1
Table 1B.1 Summary of Sampling Plan
Sample Analytical Method(3)
Composite Samples(1) Grab Samples(2)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Influent
Grit
Chamber
Influent
Grit
Chamber
Effluent
Primary
Clarifier
Effluent
Primary
Trickling
Filter Pump
Station
Primary
Trickling Filter
No. 1 Effluent
Primary
Trickling Filter
No. 2 Effluent
Intermediate
Clarifier
Effluent
Secondary
Trickling
Filter Pump
Station
Secondary
Trickling
Filter No. 1
Effluent
Secondary
Trickling
Filter No. 2
Effluent
Effluent Primary
Sludge
Intermediate
Clarifier
Underflow
Secondary
Clarifier
Underflow
Thickener
Underflow
Thickener
Overflow
Digested
Sludge
Drying Bed
Supernatant
Sample Volume Required (liters) 5.5 2.5 2.5 3 5 3.5 3.5 2 5 2.5 2.5 5 1.5 2 2 Field Measurements
Flow ●(7)
Temperature SM 2550 B ●(7) ●(7) ●(7)
pH ●(7) ●(7) ●(7)
Gas Flow ●(7)
Unfiltered
COD SM 5220 B, C, or D ● ● ● ● ● ● ● ● ● ● ● ● ● ●
BOD SM 5210 B ● ● ● ●
CBOD SM 5210 B ●(7) ● ● ● ● ● ● ● ● ● ● ●(7) ● ●
TSS SM 2540 D ●(7) ● ● ● ● ● ● ● ● ● ● ●(7) ● ● ● ●(7) ● ●(7) ● VSS SM 2540 D,E ● ● ● ● ● ● ● ● ● ● ● ●(7) ●(7)
TKN EPA 351.1 ●
TP EPA 200.7/200.8 ● ●
Alkalinity SM 2320 B ● ● ● ● ●(7)
Filtered(4)
sCOD SM 5220 B, C, or D ● ● ● ● ● ● ● ● ●
sBOD SM 5210 B ● ● ● ●
sCBOD SM 5210 B ● ● ● ● ● ●
sTKN EPA 351.1 ● ●
Ortho-P SM 4500 PE ●
Filtered(5)
NH3-N SM 4500-NH3 H ● ● ● ●
NO3-N SM 4500/EPA 300.0 ● ● ●
NO2-N SM 4500/EPA 300.0 ● ● ●
TN SM 4500 N, E ● ● ●
Flocculated/Filtered(6)
ffCOD SM 5220 B, C, or D ●
Notes:
BOD - biochemical oxygen demand; EPA - Environmental Protection Agency; ffCOD - flocculated/filtered chemical oxygen demand; sBOD - soluble biochemical oxygen demand; sCBOD - soluble carbonaceous biochemical oxygen demand; sCOD - soluble chemical oxygen demand; SM - Standard Method; sTKN - soluble total Kjeldahl nitrogen
(1) Composite sampling will be flow-paced where possible. (2) Daily sample recommended.
(3) Listed references are Standard Methods for the Examination of Water and Wastewater, 21st edition (https://www.standardmethods.org/). (4) Filtered through 1.2-to-1.5-micron glass fiber filter (the same as those typically used to measure plant TSS/VSS). Filtration should occur immediately after collection before samples are shipped. (5) Filtered through 0.45-micron Millipore filter. Filtration should occur immediately after collection before samples are shipped. Prior to filtration, filters should be triple rinsed with deionized water. (6) Sample preparation per Mamais et al., 1993 (https://www.sciencedirect.com/science/article/abs/pii/004313549390211Y). (7) Red dots designate data that is currently collected by the City.
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX 1C SK VALUE CALCULATIONS
SK Value Calculations
Parameter PTF #1 PTF #2 STF #1 STF #2
Q + Qr, mgd 11.4 7.8 11.5 11.5
Diameter, ft 60 60 180 180
Media Depth, ft 12 12 3.33 3.33
Specific Area , ft2 27 42 42 42
# of arms 2 2 2 2
Area, ft2 2,826 2,826 25,434 25,434
Volume, ft3 33,912 33,912 84,695 84,695
Media Area, ft2 915,624 1,424,304 3,557,199 3,557,199
Hydraulic Loading, gpm/ft2 2.80 1.92 0.31 0.31
Hydraulic Loading, m3/m2/hr 7.00 4.79 0.79 0.79
Current Organic Loading, lb BOD/kcf/d 222 150 40 40
July 2023 Site Visit
Distributor Rotational Speed, rpm 1.33 0.40 0.40 0.40
Distributor Rotation Time, secs 45 150 150 150
Distributor Rotation Time, minutes 0.75 2.50 2.50 2.50
SK, mm/pass 42.8 97.6 16.0 16.0
February 2024 Meeting
Distributor Rotational Speed, rpm 0.15 0.26
Distributor Rotation Time, secs 390 230
Distributor Rotation Time, minutes 6.50 3.83
SK, mm/pass 41.6 24.5
Recommendations for Normal Operation
Recommended SK (mm/pass) for Operation in MOP-35 200 - 600 150 - 450 50 - 150 50 - 150 Recommended SK (mm/pass) target 200 150 50 50
Distributor Rotational Speed, rpm 0.29 0.26 0.13 0.13
Distributor Rotation Time, secs 211 231 469 469
Distributor Rotation Time, minutes 3.51 3.85 7.81 7.81
Recommendations for Daily Flushing (1 hr)
Recommended SK (mm/pass) for Operation in MOP-35 600 450 150 150 Recommended SK (mm/pass) target 600 450 150 150
Distributor Rotational Speed, rpm 0.10 0.09 0.04 0.04
Distributor Rotation Time, secs 630 691 1,408 1,408
Distributor Rotation Time, minutes 10.50 11.52 23.47 23.47 SK Value Calcs.xlsxSummary 8/9/2024
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B SUPPLEMENTAL SAMPLING PLAN
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/WWTPSupplementalSamplingPlan/ProjMemo-SuppSamplingPlan FINAL / 1
PROJECT MEMORANDUM
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Project No.: 202301-00
Date: October 21, 2026
Prepared By: Graham Juby, PhD, PE
Reviewed By: Toby Pizot/Komal Rathore
Subject: Supplemental Sampling Effort
1.0 INTRODUCTION AND BACKGROUND
This project memorandum outlines the recommended sampling plan for certain specific constituents at the City of Santa Maria (City) Wastewater Treatment Plant (WWTP). This wastewater Supplemental Sampling Effort is focused on two specific purposes. The first is to collect preliminary/baseline data for constituents not required under the current discharge permit but which may be regulated in the future.
The second is to gather additional information on the impact of septage discharges on the influent nitrogen concentrations. The data will be incorporated into Volumes 2 and 3 of the Master Plan.
The supplemental sampling plan is recommended for three weeks, with samples collected once per week. It is intended that all the samples will be collected by the WWTP staff on the same day, and during similar approximate times over the three week period. For example, the samples may all be collected on Wednesdays near 10 a.m. over three weeks.
2.0 SAMPLING PLAN
It is recommended that samples be taken during a one-to-two-hour time period on the same day of the week. This sampling event shall recur at this same period and day for three weeks. Samples will be collected at three locations: Junction Box A, the influent to Junction Box B, and the secondary effluent box.
A comparison of the concentrations between Junction Box A and B will provide information about the impact of septage on the wastewater quality.
Table 1 summarizes the volumes that will be collected from each sample location.
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.21 18:20:57-07'00'
PROJECT MEMORANDUM
FINAL / 2
Table 1 Sampling Plan Locations
Location Grab Sample Volume (Liter) Constituents to be Sampled Junction Box A 2 TKN, NH3
Junction Box B 2 TKN, NH3
Secondary Effluent Box 8 See Table 2
Notes:
NH3 - ammonia; TKN - total Kjeldahl nitrogen
Each sample will be transferred into the sample bottles furnished by the external laboratory, FGL, Inc. (FGL). It is anticipated that City staff will collect all samples and transfer the grab samples into the sample bottles. It is also anticipated that the City staff will prepare the sample bottle labels and prepare the Chain of Custody form from the laboratory.
Note that actual sample volumes may differ depending on the number of bottles requested by the laboratory for the specific analysis to be performed. Bottles will be provided by the contract laboratory, and pickup of the samples will be coordinated by the City.
Table 2 summarizes the constituents that will be analyzed from samples collected at the Secondary Effluent Box.
Table 2 Constituents for Analysis in the Secondary Effluent Constituent Sampling Method(1)
Metals
Aluminum EPA 200.7/200.8
Arsenic EPA 200.7/200.8
Cadmium EPA 200.7/200.8
Chromium EPA 200.7/200.8
Manganese EPA 200.7/200.8
Selenium EPA 200.7/200.8
Zinc EPA 200.7/200.8
Haloacetic Acids
Monochloroacetic Acid EPA 552.2
Dichloroacetic Acid EPA 552.2
Trichloroacetic Acid EPA 552.2
Monobromoacetic Acid EPA 552.2
Dibromoacetic Acid EPA 552.2
Total Trihalomethanes
Bromoform EPA 624.1
Chloroform EPA 624.1
Dichlorobromomethane EPA 624.1
Dibromochloromethane EPA 624.1
PROJECT MEMORANDUM
FINAL / 3
Constituent Sampling Method(1)
PFAS
Perfluorooctanoic Acid EPA 537.1
Perfluorooctane Sulfonate EPA 537.1
Perfluorobutanesulfonic Acid EPA 537.1
Perfluorohexane Sulfonate EPA 537.1
Perfluorononanoic Acid EPA 537.1
Miscellaneous
Sytrene EPA 524.2
MTBE EPA 524.2
Phenols EPA 420.1
Mercury EPA 245.1
Perchlorate EPA 331.0
Chlorate/Chlorite/Bromate EPA 300.1
1.4 Dioxane EPA 8270
N-Nitrosodimethylamine Not Applicable
Formaldehyde – Water EPA 8315A
Notes:
EPA - United States Environmental Protection Agency; PFAS - per- and polyfluoroalkyl substances (1) FGL will prepare sample bottles with the appropriate volume needed for each specific analysis. The 8 liters of sample indicated in Table 1 will be distributed among various sample bottles provided by FGL.
The sampling methods are standard for each constituent and mandated by state and federal law. Note that there are specific sampling instructions for collecting samples for PFAS analysis. See Attachment A for information provided by FGL.
FGL will provide all the specific sample bottles and labels required for all of the constituents, including the volatile organic compounds (VOCs), so that the City can do all of the sample segregation.
3.0 SAMPLING COSTS
An estimate of the external laboratory sampling cost was based on a recent quote received from FGL, located in San Luis Obispo. The weekly cost is estimated to be $2,781, resulting in a total analytical cost of $8,950 for the three sampling events. Samples will be collected from the WWTP, and the cost of pickup is included in the total price.
A pricing summary from FGL is included in Attachment B.
3.1 Benefits of the Sampling Exercise
The primary goal of this sampling plan is to develop a baseline for constituents that may be regulated in the future. The state and local Regional Water Quality Control Boards have indicated that most of the constituents listed in Table 2 may be of regulatory concern in the future. As such, a record of the current levels of each constituent will be useful during future discussions about regulatory standards and the type of treatment that may be needed to remove them. Further, the baseline will help with the selection of
PROJECT MEMORANDUM
FINAL / 4
process alternatives for the Phase 1 expansion and provide an understanding of the flexibility which may need to be included in the treatment plant layouts to accommodate additional processes in the future.
The supplemental goal of this exercise is to ascertain the extent to which nitrogen and ammonia is being added to the facility’s influent streams by the septage station. The December 2023 sampling exercise indicated that the influent wastewater has a relatively high concentrations of both TKN and ammonia; higher than is typical of domestic wastewater. The source of the higher nitrogen is not known, but does impact the treatment process sizing and selection. If the septage is identified as the source then this would explain the higher values and may also lead to considering different ways to address this nitrogen load, and/or policies regarding septage receiving.
4.0 NEXT STEPS
Assuming that the City is in agreement with the proposed approach, the next step will be to schedule FGL for the first round of sampling so that they can prepare the bottles and the labels.
FGL will need about 5 business days to get the prolog set up and the sample kits put together.
As mentioned above, FGL will send all of the specific bottles and labels required for all of the constituents, including the VOCs, to the WWTP laboratory so that the City can collect the samples as needed for the specific analyses.
Again, please note the special sampling protocol for PFAS (Attachment A). This should be followed closely to avoid any external contamination of the sample.
PROJECT MEMORANDUM
FINAL
ATTACHMENT A SAMPLING INSTRUCTIONS FOR
PERFLUOROALKYL SUBSTANCES (PFAS)
Sampling Instructions for Perfluoroalkyl Substances (PFAS) SI-1 Rev#4.0 SFRY 09/2020
Methods and Matrices:
Drinking Water:
• EPA 537.1
• EPA 537.1-DoD ELAP-ISO 17025 (DoD-Department of
Defense)
Non-Potable Water & Solid/Soil:
• PFAS by LCMSMS- ESB SOP T-758
• PFAS By LCMSMS (QSM 5.3 Table B-15 Compliant)
Sample Containers and Volume Requirements Guidelines:
Sample
Matrix
Method Sample
Container++
Preservative Field Blank
Container/Preservative
(if required)
Drinking
Water
EPA 537.1
or
EPA 537.1-
DoD
One 250mL
Polypropylene bottle 1.25g Trizma
Preserved Reagent Water Bottle-250mL Polypropylene bottle w/reagent water and 1.25g Trizma
and
Field Blank bottle -250mL
Polypropylene bottle, empty
Non-Potable
Water √√
PFAS by
LCMSMS-ESB SOP
T-758
or
PFAS By
LCMSMS
(QSM 5.3
Table B-15
Compliant)
One 250mL
Polypropylene
bottle
and
One 50mL
Polypropylene
conical tube**
(Required for
sample dilution, if
needed, and
difficult matrices.)
None-Unpreserved
(Effluents do
not require
preservation
for
dechlorination)
Reagent Water Bottle- 250mL
Polypropylene bottle
w/reagent water
and
Field Blank bottle -250mL
Polypropylene bottle, empty
Note: FB are recommended
but not required except for
DOD method
Solid/Soil ◊
PFAS by
LCMSMS-ESB SOP
T-758
or
PFAS By
LCMSMS
(QSM 5.3
Table B-15
Compliant)
50mL Polypropylene
conical tube**
or
8 oz. jars w/
Polypropylene/HDPE
lids
None-Unpreserved
Container N/A
Please note: Laboratories submitting samples on behalf on their client will be responsible for providing client with appropriate sample containers and preservatives.
++ Required Quality Control: Collect two additional containers for at least one site per sample set in order to provide the laboratory with the required volume to perform Matrix Spike/Matrix Spike Duplicate batch QC.
**50mL conical tubes must be filled to the line noting 3 triangles- Headspace OK (Part# for 50mL tubes B0193234 used by Babcock)** Handling Instructions:
The sample handler must wash their hands with Alconox® or Liqui-Nox® soap, rinsing with deionized water before sampling and wear nitrile gloves while filling and sealing the sample bottles. A fresh pair of gloves must be used with each sampling site. Never eat, drink or smoke during sampling activity. Fill gasoline in the vehicle the day before sampling and avoid sampling during rain if possible.
PFAA contamination during sampling can occur from a number of common sources, such as: fast food packaging, aluminum foil, zip-loc® plastic bags, glass, Teflon®, cosmetics, moisturizers, sun block, fragrances, fabric softeners, Post-it® notes, Scotch® tape, waterproof markers or notebooks and new clothing or water resistant clothing such as Gore-tex®. It is recommended that these items be avoided at least 24 hours prior to sampling. It is a good idea to fill out bottle labels and chain of custodies ahead of time.
Sample Collection:
Collect sample directly from a tap on the well discharge line, at a location prior to any treatment. Flush to waste at full flow for a minimum of 15 minutes before sample collection. Avoid taps with Teflon® tape.
Fill sample bottles nearly full, taking care not to flush out the preservative. Do not touch the inside of the bottle or lid during sampling. Invert the bottle several times to mix the sample with the preservative. Keep the sample sealed from time of collection until delivery to laboratory.
For solid or soil samples follow handling instructions above. Carefully fill conical tube with sample. Sub-samples collected should be representative of the original sample in which the sub-sample was taken.
Field Reagent Blank Instructions:
The following MUST occur at the sampling site and at the time of sampling:
1) Pour the contents of the “Preserved Reagent Water” bottle into the empty “Field Blank” bottle.
2) Keep the Field Blank bottles sealed and on ice along with the sample bottles until they are delivered to the laboratory.
3) Please return the empty Reagent Water bottle along with the samples. 4) Samples must be extracted within 14 days of the sampling date.
Storage and Transportation Instructions:
Pack samples in clean cooler inside ultra-clean polypropylene or HDPE material bags supplied by the laboratory. Tie the top of the bag to close. Surround samples with wet ice. Do not use blue ice or ice packs. Deliver to the laboratory as soon as possible.
Samples must arrive at the laboratory within 48 hours of sampling, at ≤ 10°C (50°F) but not frozen.
If samples are received more than 48 hours after sampling, they must be ≤ 6ーC (42.8°F) but not frozen. Samples received on the day of sampling need only be submitted on ice to meet the temperature requirement.
√√ For treatment facilities where equipment utilized is composed of or comes in contact with any Perfluoroalkyl Substances an Equipment Blank (Rinsate) is recommended: A sample of analyte free water poured over or through field sampling equipment prior to the collection of samples.
Upon request, a one gallon container of DI water will be provided by the laboratory in your bottle order for Equipment Blank sampling.
◊ Solid/Soil matrix please submit at least 20 grams of sample.
PROJECT MEMORANDUM
FINAL
ATTACHMENT B FGL PRICING SUMMARY