EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
8.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-07
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 D158 of 179
GB-1
GB-2
-200 (7% G, 89% S, 4% F)
M (14%)
PA (1% G, 95% S, 4% F)
M (11%)
Poorly graded SAND (SP); dark brown, moist.
Brown, trace fines.
Bottom of test pit at 12.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-08
TIME COMPLETED
1155
LOCATION DESCRIPTION
Southeast corner of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
12.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
130
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-08
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 11
12 D159 of 179
GB-1
GB-2
GB-3
-200 (2% G, 89% S, 9% F)
M (14%)
PA (0% G, 97% S, 3% F)
M (14%)
Poorly graded SAND with SILT (SP-SM); brown, moist.
Poorly graded SAND (SP); light brown, moist, trace gravel.
Lean CLAY (CL); brown with traces of white and grey lines, moist, stiff.
Poorly graded SAND (SP); brown, moist.
Bottom of test pit at 12.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-09
TIME COMPLETED
1215
LOCATION DESCRIPTION
East-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
12.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
130
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-09
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 11
12 D160 of 179
GB-1
GB-2
-200 (0% G, 90% S, 10% F)
M (14%)
-200 (1% G, 97% S, 2% F)
M (6%)
Poorly graded SAND with SILT (SP-SM); dark brown, moist.
Poorly graded SAND (SP); light brown, moist.
Lean CLAY (CL).
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-10
TIME COMPLETED
1230
LOCATION DESCRIPTION
East-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-10
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D161 of 179
GB-1
GB-2
-200 (0% G, 97% S, 3% F)
M (10%)
PA (0% G, 93% S, 7% F)
M (9%)
Poorly graded SAND (SP); dark brown, moist.
Poorly graded SAND with SILT (SP-SM); light brown, moist.
Lean CLAY (CL); brown, moist, medium stiff.
Bottom of test pit at 10.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-11
TIME COMPLETED
1245
LOCATION DESCRIPTION
Norththeast corner of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
10.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-11
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 D162 of 179
GB-1
GB-2
GB-3
-200 (0% G, 91% S, 9% F)
M (16%)
-200 (0% G, 93% S, 7% F)
M (13%)
PI (LL = 36, PL = 19, PI = 17)
M (24%)
Poorly graded SAND with CLAY (SP-SC); dark brown, moist.
Poorly graded SAND (SP); light brown, moist, trace gravel.
Seepage at 3 feet.
Lean CLAY (CL); brown, moist, soft.
Poorly graded SAND (SP); light brown, moist.
Bottom of test pit at 8.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-12
TIME COMPLETED
1310
LOCATION DESCRIPTION
North-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
8.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-12
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 D163 of 179
GB-1
GB-2
PA (1% G, 95% S, 4% F)
M (9%)
-200 (3% G, 96% S, 1% F)
M (6%)
Poorly graded SAND (SP); grey-black, moist.
Lean CLAY (CL); brown, moist, medium-stiff.
Poorly graded SAND (SP); brown with grey patches, moist.
Encountered CLAY at 8 feet bgs but test pit collapsed and was terminated at 8 feet bgs.
Bottom of test pit at 8.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-13
TIME COMPLETED
1330
LOCATION DESCRIPTION
North-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
8.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-13
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 D164 of 179
GB-1
GB-2
-200 (2% G, 93% S, 6% F)
M (14%)
-200 (0% G, 97% S, 3% F)
M (7%)
Poorly graded SAND with SILT (SP-SM); brown with black patches, moist, trace gravel.
Lean CLAY (CL); brown, moist, medium-stiff.
Poorly graded SAND (SP); brown, moist.
Bottom of test pit at 10.5 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-14
TIME COMPLETED
1345
LOCATION DESCRIPTION
West-center of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
10.5 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-14
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 D165 of 179
GB-1
GB-2
-200 (0% G, 95% S, 5% F)
M (13%)
PA (1% G, 88% S, 11% F)
M (11%)
Poorly graded SAND with SILT (SP-SM); dark brown, moist.
Grey with black.
Lean CLAY (CL); brown, moist, medium-stiff.
Poorly graded SAND (SP); brown, moist.
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-15
TIME COMPLETED
1350
LOCATION DESCRIPTION
West-center of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-15
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D166 of 179
GB-1
GB-2
-200 (1% G, 92% S, 7% F)
M (15%)
-200 (2% G, 86% S, 12% F)
M (7%)
Poorly graded SAND with SILT (SP-SM); grey with black, moist.
Brown with grey.
Lean CLAY (CL); brown, moist.
Poorly graded SAND (SP); brown, moist.
Lean CLAY (CL); brown, moist.
Poorly graded SAND (SP).
Bottom of test pit at 11.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-16
TIME COMPLETED
1405
LOCATION DESCRIPTION
East-center of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
11.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-16
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 11
D167 of 179
Project No. Date Checked By N. Simon
Boring No. Sample No. Depth (ft) Sample Type Gravel > #4 (%) Sand (%) Fines < #200 (%) LL PI pH R (ohm- cm) SO42- (mg/kg) Cl- (mg/kg) Max. Unit Weight (pcf) Optimum Water Content (%) 18T-01 1 1 GB 14.8 -- 4 88 8 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-02 1 1 GB 13.4 -- 1 89 10 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-03 1 1 GB 15.2 -- 0 96 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-03 2 6.5 GB 25.4 -- -- -- -- 45 22 -- -- -- -- -- -- -- Lean CLAY (CL) 18T-04 1 1 GB 16.8 -- 0 95 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM) 18T-05 1 3.5 GB 10.3 -- 2 95 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-06 1 1 GB 14.4 -- 0 97 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-06 2 6 GB 9.5 -- 2 95 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-06 3 7.5 GB 11.1 -- 8 82 10 -- -- -- -- -- -- -- -- -- Well-graded SAND with clay (SW-SC)18T-07 1 1 GB 14.2 -- 0 94 6 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-07 2 5 GB 13.1 -- 1 94 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-08 1 1 GB 13.6 -- 7 89 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-08 2 9 GB 11.4 -- 1 95 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-09 1 1 GB 13.7 -- 2 89 9 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-09 2 5 GB 10.0 -- 4 91 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-10 1 2 GB 13.5 -- 0 90 10 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-10 2 5 GB 5.9 -- 1 97 2 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-11 1 1 GB 9.8 -- 0 97 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-11 2 5 GB 9.2 -- 0 93 7 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC) 218-244 6/22/2018
Summary of Laboratory Test Results
R-Value
Project Name Santa Maria WWTP - Pond 12 Rehabilitation Project Manager J. Blanchard Atterberg Corrosion
USCS Classification
Sample Location
Moisture
Content
(%)
Dry Unit
Weight
(pcf)
Gradation Compaction
D169 of 179
Project No. Date Checked By N. Simon
Boring No. Sample No. Depth (ft) Sample Type Gravel > #4 (%) Sand (%) Fines < #200 (%) LL PI pH R (ohm- cm) SO42- (mg/kg) Cl- (mg/kg) Max. Unit Weight (pcf) Optimum Water Content (%) 18T-12 1 1 GB 16.1 -- 0 91 9 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC)18T-12 2 3.5 GB 12.9 -- 0 93 7 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC)18T-12 3 5 GB 24.3 -- -- -- -- 36 17 -- -- -- -- -- -- -- Lean CLAY (CL) 18T-13 1 5 GB 8.5 -- 1 95 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP) 18T-13 2 7 GB 5.9 -- 3 96 1 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-14 1 1 GB 14.4 -- 2 93 6 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-14 2 8 GB 7.2 -- 0 97 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-15 1 1 GB 13.2 -- 0 95 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-15 2 4 GB 11.4 -- 1 88 11 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-16 1 2 GB 14.8 -- 1 92 7 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC)18T-16 2 5 GB 6.9 -- 2 86 12 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC) Summary of Laboratory Test Results
Project Name Santa Maria WWTP - Pond 12 Rehabilitation 218-244 6/22/2018 Project Manager J. Blanchard Corrosion Compaction
R-Value USCS Classification
Sample Location
Moisture
Content
(%)
Dry Unit
Weight
(pcf)
Gradation Atterberg
D170 of 179
Boring Sample No. Depth (ft) AASHTO Classification Tin ID Tin Mass (g) Tin + Soil (g) Tin + Dry Soil (g) No. 4 Dish ID No. 4 Dish Mass (g) No. 4 Dish + Dry no. 4 (g) Tin + Dry Soil Minus No. 4 Passing No. 4 Passing No. 200 % Gravel % Sand % Fines Water Content (%) 18T-01 1 1 -- 106B 134.7 198.9 190.6 2X 21.0 23.5 183.8 96% 7.7% 4% 88% 8% 14.8%18T-03 1 1 -- 107C 135.0 172.9 167.9 -- 0.0 0.0 166.5 100% 4.3% 0% 96% 4% 15.2%18T-04 1 1 -- 109C 134.7 193.2 184.8 -- 0.0 0.0 182.2 100% 5.2% 0% 95% 5% 16.8%18T-06 1 1 -- 108A 134.7 205.2 196.3 -- 0.0 0.0 194.2 100% 3.4% 0% 97% 3% 14.4%18T-06 2 6 -- 203A 134.9 198.5 193.0 1U 24.1 25.1 190.3 98% 2.9% 2% 95% 3% 9.5%18T-07 1 1 -- 301A 122.9 194.5 185.6 -- 0.0 0.0 181.9 100% 5.9% 0% 94% 6% 14.2%18T-08 1 1 -- 302A 122.8 174.6 168.4 2N 21.2 24.3 163.3 93% 4.4% 7% 89% 4% 13.6%18T-09 1 1 -- 303A 122.5 174.9 168.6 1L 24.3 25.1 163.5 98% 9.3% 2% 89% 9% 13.7%18T-10 1 2 -- 306A 122.9 175.9 169.6 -- 0.0 0.0 164.7 100% 10.5% 0% 90% 10% 13.5%18T-10 2 5 -- 307A 123.0 173.2 170.4 1H 23.9 24.3 168.9 99% 2.3% 1% 97% 2% 5.9%18T-11 1 1 -- 107A 134.8 178.6 174.7 -- 0.0 0.0 173.4 100% 3.3% 0% 97% 3% 9.8%18T-12 1 1 -- 101A 134.8 197.7 189.0 2J 20.8 21.0 183.9 100% 9.0% 0% 91% 9% 16.1%18T-12 2 4 -- 101R 135.3 193.8 187.1 -- 0.0 0.0 183.5 100% 6.9% 0% 93% 7% 12.9% Percent Passing No. 200 Sieve
Test Methods: ASTM D1140, D2487
Poorly-graded SAND (SP),yellow
brown, moist
USCS Classification
& Soil Description
Poorly-graded SAND with silt (SP-SM), dark grey, moist
Poorly-graded SAND (SP), dark grey,
moist
Poorly-graded SAND with silt (SP-SM), dark grey, moist
Poorly-graded SAND (SP), dark
grey, moist
6/15/2018
Project Manager Jon Blanchard
SPECIMEN ID AND MEASUREMENTS
Testing Date
City of Santa Maria WWTP - Pond 12 Rehabilitation
N. Simon
Project Name
Poorly-graded SAND with silt (SP-SM), dark grey, moist
Poorly-graded SAND (SP),
brown, moist, few gravel
Poorly-graded SAND with silt (SP-SM), brown, moist
Poorly-graded SAND with clay
(SP-SC), dark brown, moist
Poorly-graded SAND with clay
(SP-SC), dark brown, moist
Poorly-graded SAND with silt (SP-SM), dark brown, moist Poorly-graded SAND (SP),
brown, moist
Poorly-graded SAND (SP),
brown, moist
Prewash Washed
Tested By R. Atiliano/A. Limpert Checked By
Project No. 218-244
D171 of 179
Boring Sample No. Depth (ft) AASHTO Classification Tin ID Tin Mass (g) Tin + Soil (g) Tin + Dry Soil (g) No. 4 Dish ID No. 4 Dish Mass (g) No. 4 Dish + Dry no. 4 (g) Tin + Dry Soil Minus No. 4 Passing No. 4 Passing No. 200 % Gravel % Sand % Fines Water Content (%) 18T-13 2 7 -- 102R 135.1 204.7 200.8 2H 20.8 23.0 198.1 97% 0.8% 3% 96% 1% 5.9%18T-14 1 1 -- 101B 134.5 220.2 209.4 2R 20.8 22.0 204.0 98% 5.6% 2% 93% 6% 14.4%18T-14 2 8 -- 4A 135.0 203.7 199.1 -- 0.0 0.0 197.0 100% 3.3% 0% 97% 3% 7.2%18T-15 1 1 -- 102A 134.9 223.2 212.9 -- 0.0 0.0 209.1 100% 4.9% 0% 95% 5% 13.2%18T-16 1 2 -- 9B 135.5 188.9 182.0 2I 20.9 21.2 178.5 99% 6.9% 1% 92% 7% 14.8%18T-16 2 5 -- 101B 130.8 180.5 177.3 1Y 24.4 25.5 170.7 98% 11.8% 2% 86% 12% 6.9% Poorly-graded SAND with silt (SP-SM), dark brown, moist, trace gravel
Poorly-graded SAND (SP),
brown, moist
Poorly-graded SAND (SP), dark
brown, moist
Poorly-graded SAND with clay
(SP-SC), dark brown , moist
Poorly-graded SAND with clay
(SP-SC), brown , moist
Poorly-graded SAND (SP),
brown, moist
Tested By R. Atiliano/A. Limpert Checked By N. Simon Testing Date 6/15/2018
SPECIMEN ID AND MEASUREMENTS
Prewash Washed
USCS Classification
& Soil Description
Percent Passing No. 200 Sieve
Test Methods: ASTM D1140, D2487
Project Name City of Santa Maria WWTP - Pond 12 Rehabilitation Project No. 218-244 Project Manager Jon Blanchard D172 of 179
Project Manager
Boring No. Sample
No.
Depth
(ft)
Water
Content
(%)
Gravel
(%)
Sand
(%)
Fines
(%)
D10 (mm) D30 (mm) D50 (mm) D60 (mm) Cu Cc
USCS
Classification
& Soil
Description
AASHTO
Classification
18T-02 1 1 13.4% 1% 89% 10.0% 0.08 0.21 0.32 0.38 5.10 1.60 Poorly-graded
SAND with SILT (SP-SM), brown, moist
--
18T-05 1 3.5 10.3% 3% 95% 2.9% 0.17 0.31 0.42 0.55 3.30 1.00 Poorly graded
SAND (SP), brown,
moist
--
18T-06 3 8 11.1% 8% 82% 10.4% 0.07 0.26 0.38 0.47 6.70 2.10 Well-graded SAND
with CLAY (SW-SC), brown, moist,
trace GRAVEL
--
18T-07 2 5 13.1% 1% 94% 4.6% 0.14 0.27 0.38 0.45 3.20 1.20 Poorly-graded
SAND (SP), brown,
moist, trace clay
fines
--
18T-08 2 9 11.4% 2% 95% 3.7% 0.15 0.29 0.41 0.52 3.50 1.10 Poorly-graded
SAND (SP), brown,
moist, trace fines
--
Mechnical Sieve Analysis
Test Methods: ASTM D6913, D2487, D4718
Project Name
Checked By
218-244
SUMMARY OF RESULTS
Testing Date
City of Santa Maria WWTP-Pond 12 Rehabilitation Project No.
Jon Blanchard Tested By R. Atilano/A. Limpert
N. Simon 6/15/2018
D173 of 179
Boring No. Sample
No.
Depth
(ft)
Water
Content
(%)
Gravel
(%)
Sand
(%)
Fines
(%)
D10 (mm) D30 (mm) D50 (mm) D60 (mm) Cu Cc
USCS
Classification
& Soil
Description
AASHTO
Classification
18T-09 2 5 10.0% 4% 91% 4.9% 0.11 0.22 0.32 0.37 3.30 1.10 Poorly-graded
SAND (SP), brown,
moist, trace fines
and gravel
--
18T-11 2 5 9.2% 1% 93% 6.6% 0.11 0.26 0.36 0.41 3.70 1.40 Poorly-graded
SAND with CLAY
(SP-SC), brown,
moist, clod of
CLAY
--
18T-13 1 5 8.5% 1% 95% 3.9% 0.17 0.33 0.47 0.58 3.40 1.10 Poorly-graded
SAND (SP), brown,
moist, trace SILT
--
18T-15 2 4 11.4% 1% 88% 11.1% 0.08 0.22 0.33 0.38 5.10 1.70 Poorly-graded
SAND with SILT (SP-SM), , dark grey,
moist
--
#DIV/0! ##### ###### ##### ###### ##### ##### ##### ##### #DIV/0! Well-Graded
GRAVEL with Sand
(GW) brown,
moist, subrounded
gravel
0 #DIV/0! ##### ###### ##### ###### ##### ##### ##### ##### #DIV/0! Well-Graded
GRAVEL with Sand
(GW) brown,
moist, subrounded
gravel
0 #DIV/0! ##### ###### ##### ###### ##### ##### ##### ##### #DIV/0! Well-Graded
GRAVEL with Sand
(GW) brown,
moist, subrounded
gravel
0 SUMMARY OF RESULTS
D174 of 179
18T-02
1 Poorly-graded SAND with SILT (SP-SM)
18T-05
1 Poorly graded SAND (SP)
Boring No.:
Sample No.:
Boring No.:
Sample No.:
USCS
Classification:
USCS
Classification:
GRADATION CHARTS
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand ---------------------->| <--------- Fines --------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel ---------->| <------------------------- Sand -------------------->| <--------- Fines --------->| D175 of 179
18T-06
3 Well-graded SAND with CLAY (SW-SC)
18T-07
2 Poorly-graded SAND (SP)
Boring No.:
GRADATION CHARTS
USCS
Classification:
USCS
Classification:
Boring No.:
Sample No.:
Sample No.:
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand -------------------->| <--------- Fines ------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand --------------------->| <--------- Fines ------->| D176 of 179
18T-08
2 Poorly-graded SAND (SP)
18T-09
2 Poorly-graded SAND (SP)
GRADATION CHARTS
Boring No.:
Sample No.:
USCS
Classification:
Boring No.:
Sample No.:
USCS
Classification:
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------ Sand ---------------------->| <--------- Fines --------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand ---------------------->| <--------- Fines ------->| D177 of 179
18T-11
2 Poorly-graded SAND with CLAY (SP-SC)
18T-13
1 Poorly-graded SAND (SP)
GRADATION CHARTS
Boring No.:
Sample No.:
USCS
Classification:
USCS
Classification:
Sample No.:
Boring No.:
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <---------------------- Sand ------------------------>| <--------- Fines-------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand ---------------------->| <--------- Fines --------->| D178 of 179
18T-15
2 Poorly-graded SAND with SILT (SP-SM)
Boring No.:
Sample No.:
USCS
Classification:
GRADATION CHARTS
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <---------------------- Sand ------------------------>| <--------- Fines -------->| D179 of 179
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX D GSI WATER SOLUTIONS
PERCOLATION POND PERFORMANCE
EVALUATION
City of Santa Maria
Wastewater Treatment Facility
Percolation Pond Performance Evaluation
April 16, 2024 (Revised June 4, 2024)
Prepared by:
GSI Water Solutions, Inc.
418 Chapala Street, Suite H, Santa Barbara, CA 93101
This page intentionally left blank.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. iii
Contents
Introduction ............................................................................................................................................................... 1 Facility Operation ...................................................................................................................................................... 3 Percolation Capacity ................................................................................................................................................. 6 Empirical Flow Testing .......................................................................................................................................... 6 Results7
Water Balance Results ..................................................................................................................................... 7 Discussion ......................................................................................................................................................... 8 Closure and Operational Considerations .............................................................................................................. 12 Tables
Table 1. Santa Maria Wastewater System Percolation Pond Details.................................................................... 3 Table 2. Summary of Flow Testing Results ............................................................................................................. 8 Table 3. Santa Maria Wastewater System Percolation Capacity .......................................................................... 9 Figures
Figure 1. Location Map ............................................................................................................................................ 4 Figure 2. Site Map .................................................................................................................................................... 5 Figure 3. Qualitative Pond Performance ............................................................................................................... 10 Figure 4. Quantitative Pond Performance............................................................................................................. 11 Attachments
Attachment A Percolation Pond Hydrographs
Attachment B Daily Effluent Flow Volumes
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. iv
This page intentionally left blank.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 1
Introduction
This report presents the results of a hydrogeologic assessment conducted by GSI Water Solutions, Inc. (GSI) to evaluate the current percolation capacity of ponds at the City of Santa Maria’s (City) Wastewater Treatment Facility (Wastewater System). GSI is collaborating with Yeh & Associates (Yeh) and Carollo Engineers to present a long-term percolation test to quantify the inflow, outflow, evaporation, and percolation of water that is directed into the City’s percolation ponds.
The City has faced ongoing challenges with relatively poor performance of their percolation ponds at the Wastewater System. A series of investigations over the past couple of decades have documented challenges with the percolation capacity of these ponds and identified several problems that have caused reduced infiltration capacity including clay layers at shallow depths beneath the ponds and with a minimal downward hydraulic gradient, as the main reasons for hampered infiltration and percolation.
The City’s Wastewater System is located within the Santa Maria Valley Management Area of the Santa Maria Groundwater Basin1. The site is underlain by
alluvial deposits of gravel, sand, silt and clay.
Percolation of treated wastewater from the site
can be impeded by shallow groundwater
beneath the site and by layers of clay present in
the area. The uppermost material at the site
becomes progressively finer to the west
(towards the coast). Sand and silt from the City
of Santa Maria extends towards the west to a
point approximately halfway to Guadalupe. Clay
and silt are present from this area westward.
Groundwater elevations near the site have
been as high as 30 feet below ground around
the year 2000, which have since declined to
about 110 feet below ground. Relative to the
site location, the percolation capacity is
expected to be relatively better to the east
towards Santa Maria and relatively worse
towards the west.
To document the current percolation capacity of the ponds, GSI developed and conducted flow monitoring within the City’s current percolation ponds. The objective of this flow monitoring was to understand the current wastewater percolation capacity, which involved recording inflow volumes of the treated wastewater directed into the percolation ponds, along with evaporation and rainfall, and from these data, estimating rates of wastewater percolation into the underlying groundwater basin and evaporation rates from pond water surface. The elements quantified in this overall water balance into each of the facility’s 15 percolation ponds are presented in the graphic below. Together, the documentation of these inflow components (effluent and precipitation) and outflow components (percolation and evaporation) provide the overall water budget for these ponds for this assessment.
1 Luhdorff & Scalmanini. 2025. 2024 Annual Report of Hydrogeologic Conditions, Water Requirements, Supplies and Disposition Santa Maria Valley Management Area. April 2025.
Geologic Cross Section (Luhdorff & Scalmanini, 2004)
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 2
A forthcoming report will document whether the ponds' performance has changed significantly relative to this assessment and several prior studies that focused on the existing percolation ponds. The forthcoming report will also present results of field exploration of the materials below the percolation ponds that is currently underway. GSI will conduct this further assessment to identify the geotechnical and hydrogeological factors affecting percolation capacity and identify any possible operational modifications that could be implemented to address reduced percolation pond capacity.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 3
Facility Operation
The City Utilities Department operates the Wastewater System and associated percolation ponds on an approximate 211-acre property in Santa Maria, California on Black Road between W Main Street and W Stowell Road approximately 1.5 miles west of the City. The location of the site is presented on Figure 1 and the respective locations of all percolation ponds within the facility are shown in Figure 2.
The Wastewater System is designed to treat 13.5 million gallons per day (MGD) on a maximum month basis to a secondary treatment level but is limited in disposal capacity to 8 MGD2. The percolation ponds are not currently performing adequately as indicated by percolation pond level measurements and effluent flow as presented in this report. The treatment system does not produce any recycled water, and therefore percolation and evaporation are the only means of disposal of the produced effluent.
Operationally, the treated effluent is directed to one or more ponds at a time by City staff to ponds that are available (not full) at a filling rate that greatly exceeds the percolation rate of an individual pond. Typically, a couple of ponds have been emptied and dried out and are available to receive the effluent. The maximum water depth within the 15 percolation ponds varies between completely dry and a maximum depth of 8 and 16 feet when filled. Water levels are required to be maintained with at least two feet of freeboard.
A summary of the area of the available percolation ponds to accommodate the produced effluent is presented in Table 1. Notably, the area covered by each pond varies with water depth such that water within each pond covers more area when full than when partially filled. The total volume of the ponds is approximately 300 million gallons, as shown, which is equal to 934 acre-feet.
Table 1. Santa Maria Wastewater System Percolation Pond Details Pond Area Empty
(Acres)
Area Full
(Acres) 1
Maximum Pond
Depth (Feet)2
Approximate Volume
(Million gallons)
1 6.3 8 11 26
2 7.2 8 11 27
3 3 4 16 19
4 4.4 4.6 10 11
5 6.2 7 16 36
6 6.6 7 11 25
7 1.5 2 12 4
8 2.9 3.5 9 9
11 6.2 6.3 8 16
12 5.9 7 12 25
13 6.7 8 12 28
14 6.3 7 12 26
15 5.3 7 12 24
DKC 6 7 9 19
Wash Pond 1 1.5 15 6
Total 75.5 87.9 -- 304
1: Acreage shown represent water level when full with approximately 2 feet of freeboard. 2: Maximum pond depth determined based on observed depths measured by City staff. 2 The Central Coast Regional Water Quality Control Board reduced the rated treatment capacity of the wastewater system based on the reduced percolation capacity of the ponds.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 4
Figure 1. Location Map
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 5
Figure 2. Site Map
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 6
Percolation Capacity
The current percolation capacity of the Wastewater System percolation ponds is described in the following section. A comparison of the historic percolation capacity of the ponds, along with a history of proposed and implemented improvements to the percolation ponds, will be presented in a forthcoming report.
Empirical Flow Testing
To estimate the current
percolation capacity of
the ponds, a water
balance was conducted
by GSI to estimate the
proportions of the
treated wastewater
directed into the
Wastewater System’s
ponds that ultimately
either percolate into the
underlying groundwater
or evaporate. The
analysis took place over
an approximately five-month period between
November 2023 and April 2024. This water balance conducted by GSI consisted of documenting pond level conditions on a daily basis in the course of the normal operation of the facility during this period. The ponds are operated serially through a series of fill, dry, and rest cycles. City staff do not allow percolation to continue until each pond is dry, but instead, when several feet of water remain, the City staff pumps water into another dry pond. The testing period began and ended when a similar number of ponds were completely dry. No diversions of this effluent are directed to any location other than the percolation ponds.
The water level in each pond is
measured and recorded daily
relative to staff gauges (shown
on this photo) by City staff,
which was compiled for this
water balance study. Daily
records of effluent volumes
directed to the 15 percolation
ponds were compiled from City
records. Hydrographs of the
pond water levels during the
testing period are presented as
Attachment A.
Particular attention was
focused on the rates at which effluent was directed to each of the 15 ponds, which all drained from a relatively full state until the wastewater had receded significantly. The daily volumes of effluent directed to the ponds are presented as Attachment B.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 7
To estimate evaporation rates from the percolation
ponds, GSI installed a Class A evaporation pan
equipped with a data logger (shown in this photo). The
evaporation pan meets National Weather Service Class
A specifications. It is constructed of low carbon type
304 stainless steel and is fitted with an external
NovaLynx 255-100 Analog Output Evaporation Gauge
automated system. The Analog Output Evaporation
Gauge is designed to accurately measure water level
in the evaporation pan. As water evaporates from the
pan or precipitation fills the pan, a float mechanism
turns a precision potentiometer which was monitored
by a data logger to record the change. Evaporation
data are shown on the hydrographs in Attachment A.
Precipitation data was compiled from records from
nearest rain gauge operated by the California Irrigation Management Information System (CIMIS) station
number 232 near the Santa Maria Airport to the
southwest. Precipitation records for another rainfall
gauge located farther away to the north on the Nipomo
Mesa were evaluated, but not used for this analysis
because of the much greater distance from the site
and relatively higher elevation of the gauge.
Results
During the 5-month duration of the flow testing during the winter of 2023 and spring of 2024, the ponds were partially or entirely full for a majority of the period. On average, the ponds were wetted for 72 percent of the period, which varied from 63 to 79 percent of the days during this period, respectively for ponds 15 and
5. Based on this water balance, the average percolation capacity for the Wastewater Facility was 0.27 feet per day during this period, which is equal to 3.3 inches per day or 9.6x10-5 cm/sec. This percolation rate is representative of sandy silt to clayey sand.
Water Balance Results
The total volume of effluent flow directed to the percolation ponds averaged 6.63 MGD and ranged between
5.20 and 8.42 MGD.
In addition to contributions to the ponds from the effluent, significant precipitation fell during the period between mid-November 2023 and mid-April 2024. During this period, a total of 15.0 inches of precipitation fell on the percolation ponds during a series of winter storms. Rainfall during this period added an additional 33 million gallons of water to the percolation ponds, which was equal to 0.22 MGD on average. This volume added an additional 3% of water relative to the effluent flow. Notably, this 15 inches of rainfall that fell during this period is roughly similar to the 12 inches of evaporation that occurred. During the other warmer and drier times of the year, rainfall will be limited or non-existent and evaporation will be higher.
The total inflow to the percolation ponds totaled 6.85 MGD from these two sources:
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 8
• 6.63 MGD from effluent flow (97% of total inflow), and • 0.22 MG from precipitation (3% of total inflow).
The percolation ponds accommodated the entire inflow volume due principally to percolation and, to a lesser degree, to evaporation, although some accumulation of pond volume did occur. Of the total volume of inflow to the ponds by effluent and precipitation of 6.85 MGD:
• 6.68 MGD percolated (97% of total), which ranged from 5.4 to 6.7 MGD, and • 0.18 MGD evaporated (3% of total), which ranged from zero during rainy days in the winter to 0.4 MGD during the later spring months.
The results of the testing are summarized on Table 2.
Table 2. Summary of Flow Testing Results
Flow Component Average Volume
MGD
Proportion of
Total Inflow
Inflow
Wastewater
System
Effluent
6.63 97%
Precipitation 0.22 3%
Outflow
Percolation 6.68 97%
Evaporation 0.18 3%
Note: MGD Millions of Gallons per Day
During the other warmer and drier times of the year, rainfall will be much lower, and the proportion of evaporation compared to effluent flow will be higher. Specifically, evaporation during the summer months will be as much as 80 percent higher than evaporation during the study period for an average of 0.32 MGD.
Likewise, during the entire year evaporation should average 30 to 35 percent higher compared to the study period (average of 0.23 to 0.24 MGD, or 85 to 88 million gallons).
Discussion
The City provided estimates of percolation capacity based on data provided by Mr. Russ Newman with the City based on the City’s long-term familiarity with the operation and performance of the ponds. The City’s estimates of the percolation capacity provided a range of percolation rates for each pond, which was based on a longer period than was included in this water balance analysis.
The results of this water balance suggest that the measured percolation capacity during this period closely matched the City’s estimates; the City estimated percolation capacity of 7 to 11 MGD for the Wastewater Facility, while this water balance measured the percolation capacity to be an average of 6.85 MGD, which is near the lower end of the City’s estimate. The water balance did not support the middle and higher end of the City’s range of estimated percolation capacity during the testing period.
The observed water level variation shown on the hydrographs presented as Attachment A show that the required fill, drain, and rest cycles for each pond include several periods when no water is percolating (ponds are dry) while the ponds “rest” to accommodate nitrogen removal. The A summary of the approximate percolation capacity of each of the percolation ponds, along with the relative performance of each, is presented on Table 3.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 9
Table 3. Santa Maria Wastewater System Percolation Capacity Pond Name Percolation Capacity
(MGD) Performance
1 0.8 to 1.0 Decent
2 0.6 to 0.7 Medium
3 0.6 to 0.7 Medium
4 0.1 Poor
5 0.8 to 1.0 Medium
6 0.2 Poor
7 0.1 to 0.2 Poor
8 0.1 to 0.2 Poor
11 0.3 Mediocre
12 0.3 to 0.4 Mediocre
13 0.4 to 0.5 Mediocre
14 0.2 to 0.3 Poor
15 0.4 to 0.5 Medium
DKC 0.5 to 0.6 Medium
Wash Pond 0.1 Poor
Total 5.6 to 6.8
The City’s estimate of the percolation pond performance is provided on Figure 3. As shown, the best percolating ponds are estimated to have “decent” performance (ponds 1, 2, and 3) while some ponds are estimated to have “poor” performance (ponds 4, 6, and 7). Notably, no ponds were categorized as having “great” performance.
For comparison, a similar map of the pond performance based on the same criteria, but based on the current testing is provided on Figure 4, along with a comparison of the City’s estimate and the results of this water balance. As shown, the ponds are categorized somewhat similarly, but several ponds perform relatively worse including ponds 8, 14, and the Wash Pond that all perform poorly. Likewise, ponds 3 and 12 do not perform as well as previously presented. Pond 15 appears to be performing better, at “medium” performance than previously presented. As previously, no ponds were categorized as having “great” performance.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 10
Figure 3. Qualitative Pond Performance
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 11
Figure 4. Quantitative Pond Performance
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 12
Closure and Operational Considerations
The operation of the City’s Wastewater System, as currently configured, is limited by poor percolation capacity due to factors.. The data presented in this water balance suggest that the current performance of the ponds is limited by the current percolation capacity of approximately 6 to 7 MGD.
As presented in all of the hydrographs presented in Attachment A, there are periods where the ponds are empty and not percolating effluent. While the operation of the ponds requires frequent drying, as described, these periods when the ponds are dry decreases the overall percolation capacity proportionally. The ponds were dry for 28 percent of the period of this testing during a wet winter when increased percolation capacity is typically most needed.
A geotechnical data report was prepared by Yeh and Associates for the facility3 which present the operational alternatives that may be effective to regain percolation capacity at the Wastewater System. The preliminary recommendations presented by Yeh were discussed during the project and adequately identify operational improvements that are highly likely to improve percolation capacity including the following tasks.
1. Remove the upper 2 to 4 inches of accumulated organic layer that forms following drying of beds, when possible.
2. Following removal of the shallow organic layer, perform deep ripping of the bottom of each pond when dry.
3. When possible, plan and budget for removal of clayey and silty soil within the upper 5 to 10 feet of the ponds. Yeh suggested that the phased implementation of this task would provide the city to evaluate the effectiveness of this deep soil removal program, which would include soil sampling and testing before and after the removal process.
4. Operationally, Yeh recommends reducing the total suspended solids of the effluent being introduced to the ponds.
5. Yeh mentioned focus on the elevations of the groundwater within the aquifer below the percolation ponds, which may hinder percolation at greater depths. While monitoring of these conditions is important and may affect percolation, we understand that the greatest limitations to percolation within this system are due to the shallow organic layer (2 to 4 inches), deeper (ripping depth), and 5 to 10 feet (remedied by deep removal).
6. Lastly, installation of stilling wells within the ponds would provide improved data upon which to evaluate the effectiveness of the above operational improvements. We understand that the City is installing these stilling wells within many of the percolation ponds along with automated and remote monitoring devices, which will aid in the effective operation of the Wastewater Facility. 3 Yeh and Associates. 2024. Draft Geotechnical Data Report City of Santa Maria Wastewater Treatment Plant Percolation Pond Study. Prepared for Carollo Engineers. October 3, 2024.
ATTACHMENT A
Percolation Pond Hydrographs
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 1
FIGURE A-1
Percolation Pond 1 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.40 feet
per day
0.25 feet
per day
Average:
0.32 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 2
FIGURE A-2
Percolation Pond 2 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.30 feet
per day
0.15 feet
per day
Average:
0.22 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 3
FIGURE A-3
Percolation Pond 3 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.48 feet
per day
0.38 feet
per day
Average:
0.43 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 4
FIGURE A-4
Percolation Pond 4 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.14 feet
per day
Average:
0.14 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 5
FIGURE A-5
Percolation Pond 5 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.29 feet
per day
0.36 feet
per day
Average:
0.33 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 6
FIGURE A-6
Percolation Pond 6 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.08 feet
per day
Average:
0.08 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 7
FIGURE A-7
Percolation Pond 7 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.19 feet
per day
0.19 feet
per day
Average:
0.19 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 8
FIGURE A-8
Percolation Pond 8 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.22 feet
per day
0.18 feet
per day
Average:
0.20 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 11
FIGURE A-11
Percolation Pond 11 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.14 feet
per day
0.15 feet
per day
Average:
0.15 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 12
FIGURE A-12
Percolation Pond 12 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.08 feet
per day
0.23 feet
per day
Average:
0.15 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 13
FIGURE A-13
Percolation Pond 13 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.15 feet
per day
Average:
0.15 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 14
FIGURE A-14
Percolation Pond 14 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.13 feet
per day
0.09 feet
per day
Average:
0.10 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 15
FIGURE A-15
Percolation Pond 15 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.17 feet
per day
0.21 feet
per day
Average:
0.19 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond DKC
FIGURE A-DKC
Percolation Pond DKC Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.23 feet
per day
0.17 feet
per day
Average:
0.20 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond Wash
FIGURE A-Wash
Percolation Pond Wash Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.22 feet
per day
0.17 feet
per day
Average:
0.19 feet per day
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Nov 2023
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 0 23 23 78 136 90 62 88 46 0 43 0 86 26 92
2 0 14 0 73 130 94 70 90 40 0 38 0 96 42 89
3 0 5 0 71 123 98 82 93 36 0 35 0 108 54 89
4 10 0 0 66 118 97 82 88 35 65 22 0 106 54 88
5 23 0 0 65 110 94 78 86 27 76 0 0 98 53 86
6 55 0 0 63 105 90 72 81 18 81 0 0 86 48 85
7 62 0 0 54 106 88 85 78 8 92 0 0 86 60 84
8 76 0 0 10 93 84 103 72 0 96 0 0 81 76 50
9 84 0 0 0 88 81 114 69 0 96 0 0 75 88 0
10 92 0 47 0 83 76 108 66 0 100 0 0 70 80 0
11 97 0 71 0 82 76 97 61 0 108 0 0 64 72 0
12 100 0 89 0 76 72 96 60 0 114 0 0 60 72 0
13 107 0 112 0 70 71 95 58 0 115 0 0 66 68 0
14 105 10 120 0 64 68 90 53 0 108 0 12 60 72 0
15 100 18 131 0 60 60 90 51 0 104 0 26 58 64 0
16 95 30 126 48 57 54 91 48 0 99 0 45 46 66 0
17 84 40 117 59 57 45 93 46 0 94 0 57 34 65 0
18 82 50 110 83 51 37 95 46 0 90 0 71 23 69 0
19 73 60 100 90 47 18 95 46 0 86 0 84 0 69 0
20 68 71 93 96 43 0 92 40 0 84 0 95 0 54 0
21 59 80 103 91 35 0 88 21 0 79 0 108 0 60 40
22 55 89 108 86 24 0 83 10 0 75 0 121 0 56 61
23 47 95 117 83 22 0 78 4 14 71 22 118 0 50 90
24 42 102 121 82 18 0 76 4 22 68 27 116 0 49 112
25 34 106 122 73 0 0 68 4 24 66 30 108 0 46 118
26 29 108 126 72 0 0 69 0 28 59 34 107 0 46 118
27 23 112 128 71 0 0 67 0 30 59 40 104 0 39 117
28 30 113 131 65 0 0 60 0 32 36 48 98 0 35 112
29 36 106 124 66 0 40 56 0 36 12 57 94 0 32 100
30 48 98 115 51 0 57 56 0 39 0 60 93 0 30 117
31 City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Dec 2023
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 60 93 106 0 0 57 31 0 46 0 65 91 0 23 114
2 68 86 100 0 0 76 0 0 49 0 68 86 0 23 113
3 71 78 92 0 0 85 0 0 52 0 70 83 0 18 100
4 74 72 84 0 0 93 0 0 57 0 72 80 0 14 107
5 79 66 84 0 0 86 0 44 57 0 72 76 0 5 108
6 83 60 90 0 0 87 0 72 60 0 75 72 0 2 106
7 89 55 96 0 0 84 0 90 66 0 80 71 0 0 68
8 89 48 100 0 6 80 0 84 60 0 83 65 24 0 38
9 94 42 99 0 45 80 0 82 55 0 87 66 32 0 0
10 96 36 93 0 44 78 0 80 53 0 90 62 35 0 0
11 97 32 84 0 64 78 0 75 50 0 93 59 40 0 0
12 99 18 78 0 72 78 0 72 48 0 96 53 48 0 0
13 100 6 72 0 80 84 0 70 40 0 90 52 52 0 0
14 96 4 65 0 87 88 60 68 40 0 92 49 60 3 0
15 90 0 60 0 91 84 60 65 36 12 102 37 62 34 0
16 84 0 40 0 102 84 72 64 35 38 96 33 67 42 0
17 75 0 6 0 112 80 86 60 32 48 84 22 70 60 0
18 67 0 0 0 115 79 99 59 32 56 86 0 74 72 0
19 62 0 0 39 120 78 108 43 22 67 86 0 86 80 0
20 56 0 0 48 126 77 114 23 0 73 84 0 99 84 0
21 48 10 0 72 138 76 109 10 0 78 83 0 103 84 0
22 46 33 0 79 126 73 106 0 0 82 76 0 103 79 0
23 41 50 0 83 131 72 102 0 0 85 75 0 106 75 0
24 33 65 0 84 128 70 100 0 0 89 72 6 108 72 0
25 28 80 0 86 124 70 96 0 0 91 68 22 104 69 0
26 21 90 0 85 117 67 92 0 0 92 67 25 96 64 10
27 12 101 31 85 113 66 87 0 0 93 63 36 94 60 10
28 6 102 101 87 108 68 86 0 0 100 50 39 90 55 15
29 0 105 131 86 106 63 83 0 0 111 45 47 90 56 13
30 0 98 142 86 102 62 81 34 19 107 30 61 85 56 17
31 0 94 152 86 96 60 80 55 24 106 0 77 85 40 15
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Jan 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 101 86 146 86 90 59 78 58 30 101 0 82 81 50 0
2 18 84 140 89 94 60 87 77 35 96 0 84 80 48 18
3 35 77 132 89 88 57 88 72 38 94 0 88 74 48 20
4 46 74 124 90 90 55 80 92 44 89 0 84 72 48 20
5 60 72 118 88 82 53 60 92 48 87 0 99 72 36 65
6 70 70 112 98 94 56 55 88 52 85 6 96 70 26 96
7 75 66 104 92 106 52 50 86 54 82 24 96 68 12 126
8 83 60 100 91 114 50 49 82 56 80 28 95 64 4 143
9 88 59 96 91 124 48 48 78 59 79 36 92 64 0 160
10 96 52 90 91 133 44 47 76 63 69 46 91 61 0 156
11 104 52 84 91 140 28 47 74 68 52 60 89 61 0 153
12 108 48 82 93 144 31 46 72 71 41 70 90 58 0 150
13 106 46 76 87 146 28 60 70 67 30 76 86 59 10 147
14 100 54 71 86 144 0 64 66 63 0 80 86 60 35 144
15 94 63 66 85 137 0 77 67 65 0 78 85 60 51 143
16 92 72 48 82 132 0 90 54 60 0 82 90 48 62 140
17 83 80 23 79 131 0 100 40 60 0 95 98 37 75 161
18 77 89 8 76 126 0 111 16 60 0 104 106 16 84 163
86 73 97 0 75 122 0 118 12 58 0 109 107 16 86 161
20 71 104 0 73 119 39 115 0 58 34 110 107 0 88 159
21 66 110 0 72 116 50 112 0 56 57 107 106 0 85 156
22 60 102 52 70 112 60 110 0 55 85 105 104 0 83 152
23 60 100 80 70 108 65 107 0 53 95 100 101 0 80 149
24 54 95 104 67 105 73 104 0 53 109 100 101 0 77 146
25 48 91 124 65 100 80 104 0 48 123 97 100 0 77 143
26 44 88 126 64 99 81 102 0 40 123 95 100 38 78 140
27 50 82 130 60 94 80 106 37 33 117 92 97 48 81 134
28 59 80 126 60 91 81 108 61 26 111 91 96 60 81 132
29 70 75 120 58 90 77 108 78 20 108 88 96 79 82 129
30 83 74 117 58 86 76 110 88 0 107 88 96 93 83 127
31 93 71 109 53 83 77 108 94 0 104 87 95 107 77 114
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Feb 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 99 68 107 56 108 76 106 94 12 100 86 95 109 27 123
2 105 65 104 54 138 74 105 91 0 99 85 95 110 76 120
3 107 63 98 56 154 72 96 87 12 96 84 93 107 73 116
4 101 72 108 52 149 72 94 84 36 92 83 90 103 71 113
5 96 83 124 52 142 72 94 83 58 90 83 93 102 69 116
6 94 93 126 52 140 71 94 82 79 88 83 94 100 68 114
7 90 102 141 34 134 70 96 80 76 112 68 92 98 69 114
8 85 108 148 0 131 70 96 78 74 131 67 93 96 70 124
9 89 110 152 0 127 68 98 76 72 130 66 100 102 71 123
10 92 110 148 0 136 68 100 74 70 124 63 104 106 72 120
11 94 106 140 0 148 66 100 71 68 120 56 107 108 74 118
12 96 106 136 0 156 64 102 69 66 116 50 112 112 74 117
13 99 104 138 0 159 64 102 67 66 112 46 117 116 75 131
14 104 101 143 0 162 55 104 66 65 109 33 120 118 75 132 15 106 100 148 0 168 43 104 64 64 107 28 122 122 77 168 16 109 100 153 0 170 35 105 75 62 107 24 127 124 78 168 17 106 98 153 40 170 20 108 85 60 106 12 126 120 78 165 18 110 96 154 58 172 8 104 84 58 106 6 130 122 74 162
19 114 96 156 73 174 6 102 84 59 110 6 132 126 72 162
20 116 95 160 81 176 0 98 83 59 114 0 137 131 72 161
21 118 92 162 95 178 0 100 69 55 117 0 136 132 72 158
22 119 89 166 104 183 0 101 52 48 115 0 140 132 73 158
23 121 91 165 109 180 0 101 36 40 115 0 142 132 76 154
24 121 94 168 112 183 0 103 23 34 116 0 142 132 76 153
25 121 96 172 113 184 0 105 10 26 116 0 143 132 76 150
26 120 108 170 108 184 0 106 0 16 112 0 142 131 77 146
27 120 119 168 104 184 0 104 0 0 109 0 136 127 76 144
28 122 124 171 101 186 0 106 0 0 109 0 138 122 77 126
29 124 132 168 103 187 0 108 0 0 105 0 136 112 80 112
30 31
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Mar 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 126 130 170 100 188 16 109 0 0 107 16 136 102 82 82
2 128 130 171 104 188 34 108 0 0 108 24 138 96 82 60
3 130 128 173 102 194 44 114 0 0 114 32 134 92 84 30
4 131 117 172 100 192 47 114 0 0 118 36 132 82 88 12
5 131 114 173 100 192 52 116 0 0 120 42 131 72 88 0
6 130 111 174 100 192 56 118 0 0 122 46 131 66 90 0
7 131 102 176 102 193 60 119 0 0 126 53 129 59 92 38
8 130 95 174 104 193 64 119 0 0 129 56 126 50 93 24
9 131 83 174 104 193 70 120 0 0 132 60 130 40 92 0
10 131 76 172 103 193 76 121 0 0 134 64 124 36 92 0
11 131 62 172 105 192 82 122 0 0 137 71 124 29 95 0
12 132 60 175 104 191 84 124 0 0 141 76 122 22 95 0
13 131 48 175 104 192 86 121 0 12 138 79 121 0 92 0
14 131 36 175 104 192 88 116 0 24 134 87 114 0 88 0
15 131 28 168 105 191 94 113 12 31 127 96 108 0 88 0
16 131 20 166 106 192 95 113 25 43 126 104 100 0 86 0
17 131 12 156 106 192 96 111 36 50 120 107 95 0 83 0
18 130 6 152 105 192 96 107 47 58 116 111 88 0 80 0
19 130 0 140 106 192 97 107 52 68 112 115 83 0 78 0
20 130 0 124 106 189 98 104 58 78 108 120 76 0 76 0
21 130 0 120 105 188 98 102 66 78 107 130 68 0 73 0
22 130 0 105 105 189 99 96 74 76 102 133 60 34 74 0
23 130 0 90 106 189 99 98 80 75 99 136 52 50 70 0
24 129 0 72 105 188 99 96 87 70 95 138 42 68 70 0
25 129 0 53 105 188 99 93 90 66 93 140 32 83 64 0
26 128 0 40 105 188 99 95 95 64 88 144 19 98 64 0
27 128 0 21 104 187 99 90 98 61 88 144 8 107 63 0
28 127 0 0 105 188 100 88 95 59 88 145 0 114 61 0
29 124 8 0 104 184 96 85 89 65 73 144 0 113 55 60
30 124 13 0 104 184 93 76 84 69 64 145 0 119 47 94
31 123 25 0 102 183 91 66 82 73 48 145 0 122 40 124
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Apr 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 122 42 0 100 180 38 58 76 71 24 141 0 128 32 150
2 120 52 0 100 180 84 52 72 67 0 136 0 130 24 170
3 119 66 0 100 180 81 15 81 66 0 134 0 129 18 170
4 119 76 0 99 180 78 0 86 64 0 132 0 128 12 168
5 119 90 0 102 180 78 0 93 64 0 131 0 128 8 166
6 118 96 0 102 180 75 0 96 60 0 129 0 127 0 163
7 118 106 0 101 180 65 0 91 59 0 127 0 129 0 160
8 118 112 0 100 178 50 0 84 56 0 124 0 130 0 156
9 118 118 0 100 177 46 0 78 44 0 124 0 132 0 157
10 118 122 0 100 177 38 0 75 52 0 124 0 134 0 154
11 119 126 0 100 176 20 0 72 52 0 124 0 136 0 152
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
ATTACHMENT B
Daily Effluent Flow Volumes
City of Santa Maria Wastewater Treatment Plant Daily Log 2023 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 2 (ft3) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare Time
1 6.87 5,440 91,445 71,804 1 1 34700 0 0 300 54,235 300 809 2 6.99 5,600 95,615 77,439 1 1 36400 0 0 300 57,212 400 801 3 6.39 4,640 88,220 69,472 1 1 31000 0 0 200 49,502 250 900 4 7.26 5,920 101,513 84,949 1 1 34800 0 0 400 58,432 250 552 5 7.29 5,600 91,881 75,867 1 1 35600 0 0 300 49,549 300 656 6 6.99 5,760 81,476 67,457 1 1 32400 0 0 300 45,631 250 821 7 6.90 5,760 82,411 67,662 1 1 32900 0 0 300 49,919 200 756 8 6.87 5,760 78,461 67,898 1 1 32400 0 0 300 52,432 250 805 9 6.75 5,920 89,145 77,077 1 1 34300 0 0 300 52,785 200 740 10 6.42 5,280 79,252 70,888 1 1 31300 0 0 200 46,537 200 800 11 6.51 5,760 87,236 76,306 1 1 35200 0 0 300 52,393 175 540 12 6.85 6,080 87,669 77,449 1 1 37800 0 0 400 53,930 175 600 13 6.54 5,120 71,244 62,821 1 1 33000 0 0 300 43,870 150 755 14 7.10 6,240 84,095 73,960 1 1 38200 0 0 300 50,361 150 605 15 6.61 5,440 81,631 67,665 1 1 35700 0 0 300 49,492 200 750 16 6.90 5,600 93,042 78,955 1 1 36300 0 0 300 53,857 150 755 17 6.57 4,960 84,259 68,806 1 1 32900 0 0 300 45,556 180 800 18 6.91 5,760 95,196 74,577 1 1 40100 0 0 300 53,200 100 648 19 6.80 5,760 87,413 71,730 1 1 37000 0 0 300 49,631 150 835 20 6.88 5,920 86,607 69,767 1 1 35000 0 0 300 51,628 170 830 21 6.91 5,760 89,244 68,678 1 1 35600 0 0 300 51,003 100 814 22 6.49 5,120 81,241 58,524 1 1 30100 0 0 200 46,296 175 759 23 6.43 5,600 95,302 71,456 1 1 34700 0 0 300 50,767 100 609 24 6.39 6,720 101,733 82,719 1 1 40700 0 0 400 58,930 100 507 25 6.32 5,600 89,684 67,716 1 1 35400 0 0 300 51,521 170 745 26 6.68 6,080 91,753 72,418 1 1 38400 0 0 300 50,136 150 800 27 6.70 5,760 77,621 73,637 1 1 35900 0 0 300 46,821 130 800 28 6.97 6,240 74,691 52,169 1 1 36700 0 0 300 30,618 160 815 29 6.53 5,760 68,231 53,708 1 1 35400 0 0 300 44,902 200 840 30 6.70 5,920 83,463 79,008 1 1 37400 0 0 300 50,678 100 815 AVE. 6.75 5696 86359 71086 35243 50061 186
H2S Readings
NOV WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2023 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 2 (ft3) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare Time
1 6.35 5440 79220 66,476 1 1 32700 0 0 300 47,278 150 810 2 6.49 6240 96219 83,326 1 1 42700 0 0 300 55,053 125 559 3 6.66 6080 96256 81,087 1 1 40700 0 0 300 54,156 200 751 4 6.75 5920 88475 72,182 1 1 37100 0 0 300 51,231 200 839 5 6.88 6080 92759 78,493 1 1 39400 0 0 300 54,540 200 730 6 6.53 5600 87578 71,042 1 1 37200 0 100 300 53,495 200 801 7 6.60 5920 95320 74,351 1 1 38900 0 0 300 55,960 200 755 8 6.34 5600 89026 70,799 1 1 38000 0 0 300 52,648 175 801 9 6.23 5920 96540 72,143 1 1 36900 0 0 300 57,078 200 734 10 6.58 6080 90160 76,975 1 1 40300 0 0 300 54,199 200 800 11 6.60 5600 77708 65,910 1 1 39300 0 0 300 48,854 150 823 12 6.74 6080 81800 68,094 1 1 39200 0 0 300 55,955 100 819 13 6.43 5280 83586 71,025 1 1 39900 0 0 300 55,282 200 802 14 6.59 5600 88668 70,876 1 1 39600 0 0 300 52,106 150 811 15 6.11 4960 78549 66,643 1 1 34600 0 0 200 44,882 125 820 16 6.21 5600 90728 77,356 1 1 40700 0 0 400 52,266 100 530 17 7.69 5920 89109 76,340 1 1 42100 0 0 300 55,706 125 632 18 6.71 5440 79680 65,641 1 1 35100 0 0 300 46,287 120 820 19 6.67 5440 86860 66,442 1 1 31700 0 0 300 52,178 150 805 20 8.16 5600 53123 64,524 1 1 38500 0 0 300 52,950 150 800 21 8.07 5760 89700 76,600 1 1 33100 0 0 300 53,558 200 744 22 6.63 5280 85021 70,333 1 1 36600 0 0 200 48,597 150 813 23 6.32 5440 87441 68,117 1 1 37400 0 0 300 49,367 150 646 24 6.14 5600 82281 72,158 1 1 37600 0 0 300 51,021 150 626 25 5.70 5920 86564 76,788 1 1 41200 0 0 300 56,110 150 640 26 6.20 5600 84821 65,316 1 1 35600 0 0 300 50,351 140 800 27 6.20 5920 77443 65,046 1 1 38000 0 0 300 49,776 200 815 28 5.60 6080 93370 80,599 1 1 38700 0 0 300 54,001 160 840 29 7.40 5760 88503 75,399 1 1 31800 600 0 200 54,844 170 810 30 6.70 8640 85220 74,837 1 1 0 7500 0 300 51,430 150 745 31 6.40 3360 84753 73,893 1 1 0 7800 0 300 50,758 150 755 AVE. 6.60 5734 86016 72220 35310 52320 161
H2S Readings
DEC WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 5.40 35 76,667 65,443 1 1 0 7200 0 300 47,278 150 745 101 2 6.50 34 80,426 65,770 1 1 0 6800 0 300 50,062 180 800 101 3 6.30 36 79,214 61,574 1 1 0 6400 0 300 49,523 215 815 109 4 6.12 33 86,260 69,653 1 1 0 7000 0 200 52,155 175 800 109 5 5.88 30 76,468 65,000 1 1 24,900 1600 0 300 68,683 175 821 124 6 5.20 37 92,062 76,249 1 1 38,200 0 0 300 29,299 200 532 101 7 6.94 38 91,618 76,247 1 1 40,100 0 0 300 56,441 180 635 109 8 6.33 38 81,909 68,138 1 1 36,400 0 0 300 46,111 150 850 117 9 6.21 38 83,470 67,966 1 1 38,100 0 0 300 49,323 180 811 94 10 6.23 37 79,218 67,711 1 1 39,800 0 0 300 52,785 200 813 104 11 6.08 38 82,586 76,238 1 1 35,500 0 0 200 49,576 200 854 109 12 5.99 38 84,315 72,155 1 1 35,300 0 0 300 48,935 200 820 109 13 6.10 36 76,010 62,637 1 1 35,400 0 0 300 43,015 200 810 101 14 5.98 37 72,704 62,712 1 1 37,000 0 0 300 52,953 140 810 109 15 6.55 35 83,110 67,344 1 1 39,100 0 0 300 54,625 150 820 109 16 6.32 36 81,921 63,921 1 1 37,800 0 0 200 37,858 200 820 125 17 6.04 36 76,531 61,723 1 1 38,000 0 0 300 52,720 200 755 72 18 6.06 36 89,864 76,480 1 1 41,100 0 0 300 56,417 100 735 109 19 5.96 33 87,026 73,669 1 1 38,500 0 0 300 54,765 150 805 121 20 6.31 34 92,985 76,024 1 1 40,200 0 0 300 58,932 175 722 115 21 6.76 36 90,465 75,262 1 1 40,900 0 0 200 61,646 125 743 125 22 6.48 33 77,271 65,482 1 1 37,600 0 0 300 51,924 175 831 127 23 6.53 37 66,329 52,622 1 1 39,400 0 0 300 51,474 150 608 109 24 6.89 44 82,261 64,305 1 1 43,500 0 0 300 60,812 150 613 101 25 6.17 36 63,675 56,881 1 1 37,800 0 0 300 55,421 125 850 125 26 6.21 36 88,028 68,836 1 1 38,900 0 0 300 56,073 100 812 117 27 6.17 37 95,932 75,059 1 1 38,500 0 0 300 56,399 125 813 121 28 6.53 37 85,129 68,813 1 1 11,100 500 0 300 56,416 150 825 121 29 6.48 35 90,349 68,403 1 1 34,400 1400 0 200 57,360 175 825 119 30 6.08 39 88,568 78,729 1 1 45,300 0 0 300 60,306 200 844 121 31 7.28 38 79,656 72,285 1 1 31,600 400 0 300 47,126 150 834 125 AVE. 6.26 36 82646 68495 32077 52465 112
Ferrous
Chloride
Gal
Digester Gas Production H2S Readings JAN WWTP
(MGD)
Elec. Usage
(kwh)
Gas Flares Propane to Boiler Flare
Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 6.26 31 77,360 53,017 1 1 39300 300 0 300 45,121 175 830 94 2 6.45 41 91,213 68,239 1 1 11200 5300 0 300 50,013 150 745 94 3 6.51 28 94,347 75,702 1 1 0 8500 0 300 53,384 125 700 109 4 7.11 37 102,227 79,069 1 1 0 9500 0 300 56,252 100 720 113 5 7.63 37 82,136 66,425 1 1 34800 1400 0 200 51,372 150 845 117 6 6.78 34 84,032 64,027 1 1 36800 0 0 300 46,713 125 827 101 7 7.74 42 106,184 75,311 1 1 45800 0 0 300 57,862 175 543 101 8 6.96 39 94,016 73,403 1 1 38000 0 0 300 53,611 150 800 125 9 6.30 39 84,217 60,732 1 1 32500 0 0 300 46,303 125 801 113 10 6.95 38 87,230 68,430 1 1 36200 0 0 300 52,476 125 543 101 11 7.15 42 97,308 74,139 1 1 38300 0 0 300 54,616 100 629 109 12 6.35 32 78,866 62,888 1 1 32500 0 0 300 48,430 125 800 109 13 7.10 41 97,164 73,438 1 1 37900 0 0 300 55,031 200 624 98 14 6.39 35 81,373 70,704 1 1 36800 100 0 300 47,912 175 839 105 15 6.62 36 81,926 70,584 1 1 38500 0 0 300 48,620 150 820 98 16 6.32 31 71,619 62,298 1 1 32900 0 0 200 41,865 150 802 99 17 6.84 35 82,229 67,133 1 1 36300 0 0 300 47,856 175 508 86 18 8.42 40 95,449 77,874 1 1 38300 0 0 400 60,362 200 953 96 19 7.74 37 79,769 68,812 1 1 36400 0 0 300 51,567 175 826 121 20 7.02 38 91,859 69,021 1 1 38900 0 0 300 49,780 200 756 101 21 7.02 38 88,947 75,705 1 1 38800 0 0 300 53,228 200 801 101 22 6.64 37 93,245 70,909 1 1 37400 0 0 300 56,362 200 759 109 23 6.53 38 89,989 79,544 1 1 37400 0 0 300 60,934 225 809 117 24 6.64 35 93,548 78,967 1 1 37600 0 0 300 60,893 225 739 121 25 6.79 39 97,901 81,304 1 1 42700 0 0 300 67,660 225 702 125 26 6.89 36 88,813 78,702 1 1 40300 0 0 300 62,730 250 802 137 27 6.85 37 93,629 75,002 1 1 45000 0 0 300 60,437 250 802 125 28 6.71 35 85,107 72,530 1 1 43800 0 0 300 58,062 300 811 119 29 6.63 35 88,761 74,067 1 1 34600 0 0 300 54,769 250 811 113 AVE. 6.87 37 88982 71310 34448 53594 109
Ferrous
Chloride
Gal
H2S Readings
FEB WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 7.00 32 77,406 59,390 1 1 30400 0 0 300 47,469 225 746 113.1 2 7.12 36 92,389 70,938 1 1 37800 0 0 300 53,059 175 445 101.4 3 7.11 38 108,466 86,091 1 1 42300 0 0 300 62,385 225 500 109.2 4 6.92 39 87,441 72,806 1 1 35700 0 0 300 44,623 225 844 124.8 5 6.71 37 82,911 70,089 1 1 35500 0 0 300 47,190 200 820 97.5 6 7.28 39 81,464 69,546 1 1 36900 0 0 300 55,573 300 751 101.4 7 6.71 38 95,353 78,706 1 1 36100 0 0 300 56,433 250 828 117 8 6.58 37 86,607 72,250 1 1 34000 0 0 300 50,780 225 815 120.9 9 6.55 36 90,095 70,583 1 1 34900 0 0 300 50,629 250 700 109.2 10 6.57 39 92,762 78,175 1 1 37000 0 0 300 54,213 200 730 109.2 11 6.53 32 84,528 66,157 1 1 32100 0 0 200 46,524 300 820 117 12 6.77 37 88,079 74,371 1 1 37800 0 0 400 55,552 300 517 101.4 13 7.05 39 86,963 77,523 1 1 40800 0 0 300 59,770 300 558 124.8 14 6.49 34 83,363 71,758 1 1 33100 0 0 200 50,128 225 825 127.5 15 6.59 34 90,529 73,203 1 1 35400 0 0 300 54,133 200 550 113.1 16 6.57 36 94,953 80,193 1 1 37700 0 0 300 56,934 225 549 124.8 17 7.18 38 93,850 80,017 1 1 38900 0 0 300 56,172 225 639 128.7 18 6.20 34 75,392 65,863 1 1 31600 0 0 200 45,030 225 833 120.9 19 6.85 38 86,470 71,224 1 1 35800 0 0 300 53,830 200 554 101.4 20 7.07 41 94,277 74,653 1 1 36800 0 0 400 65,192 300 609 120.9 21 6.77 37 100,184 82,824 1 1 33300 0 0 200 58,277 200 809 144.3 22 6.49 34 91,467 71,140 1 1 28800 0 0 300 53,495 300 759 132.6 23 6.83 37 100,710 80,652 1 1 34700 0 0 300 62,355 225 555 117 24 6.67 37 86,452 73,169 1 1 34500 0 0 300 58,128 300 620 132.6 25 6.63 38 82,204 70,329 1 1 36900 0 0 300 55,892 300 620 128.7 26 6.63 40 81,427 67,580 1 1 36600 0 0 300 51,804 250 610 117 27 6.53 36 79,464 63,000 1 1 36900 0 0 300 51,593 320 543 117 28 6.73 41 93,866 81,485 1 1 37600 0 0 300 52,333 275 600 113.1 29 6.75 35 76,184 61,746 1 1 30900 0 100 300 46,896 250 753 117 30 6.94 37 82,976 66,959 1 1 32800 100 0 300 49,898 290 646 105.3 31 6.94 39 84,060 71,076 1 1 35900 0 0 300 50,222 290 714 111.15 AVE. 6.77 37 88138 72693 35468 53436 117
Ferrous
Chloride
Gal
H2S Readings
MAR WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 6.65 36 87,914 71,051 1 1 34,400 0 0 300 51,128 310 756 111.15 2 6.52 34 81,040 67,798 1 1 31,500 0 0 300 43,735 300 752 120.9 3 6.46 33 87,646 68,117 1 1 35,500 0 0 300 52,557 350 551 105.3 4 6.19 39 100,998 81,657 1 1 36,900 0 0 300 60,025 275 619 117 5 7.70 34 81,025 70,467 1 1 31,900 0 0 300 54,636 275 812 140.4 6 6.71 42 89,100 77,400 1 1 34,300 0 0 200 57,972 225 620 121 7 6.73 31 93,345 76,937 1 1 35,100 0 0 400 53,860 225 615 132.6 8 6.61 38 83,228 69,145 1 1 32,000 0 0 200 51,718 200 745 124.8 9 6.42 36 84,075 66,648 1 1 30,800 0 0 300 50,614 225 735 109.2 10 6.50 36 90,898 69,340 1 1 35,300 0 0 300 55,484 300 554 113.1 11 6.90 42 98,733 80,272 1 1 38,500 0 0 300 60,534 300 530 124.8 12 6.37 37 78,603 63,119 1 1 34,300 0 0 300 56,319 225 805 132.6 13 7.68 35 85,308 64,956 1 1 33,900 0 0 300 54,273 200 740 124.8 14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 AVE. 6.73 36 87839 71301 34185 54066 121
Ferrous
Chloride
Gal
H2S Readings
APR WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX E PROJECT MEMORANDUM - PERCOLATION
POND EVALUATION
PROJECT MEMORANDUM
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Percolation Pond Evaluation Memo/ProjMemo_PercPondEval.docx REVISED FINAL / 1
CITY OF SANTA MARIA
Wastewater System Master Plan - Percolation Pond Evaluation Project No.: 202301
Date: February 5, 2026
Prepared By: Graham Juby, PhD, PE
Reviewed By: Rajesh Doppalapudi, PE / Lydia Holmes, PE
Subject: Percolation Pond Evaluation
1.0 PERCOLATION POND INVESTIGATION
1.1 Introduction
The City of Santa Maria (City), California, treats domestic, commercial, and industrial wastewater from its service area at its wastewater treatment plant (WWTP) and discharges treated wastewater to land via percolation ponds. This discharge is permitted under the City's General Waste Discharge Requirements Order (No. R3-2020-0020). As required by the new Order, the City developed a Time Schedule Compliance Plan (TSCP), which was submitted to the Central Coast Regional Water Quality Control Board (RWQCB) in June 2024.
There were several tasks and milestones identified in the TSCP. The purpose of this Project Memorandum is to provide an update on Milestone No. 5 related to the percolation pond capacity. For Milestone No. 5, the City was to conduct a study to determine the percolation pond capacity through a water balance, evaluate the geology/hydrogeology, and provide recommendations for any pond improvements. The City submitted a letter to the RWQCB on December 31, 2024, providing the required update for Milestone No. 5, and in response, the RWQCB requested a technical engineering report certified by a professional licensed civil engineer. This Project Memorandum serves as the requested technical engineering report.
Since submission of the December 31, 2024, letter to the RWQCB, the City and Carollo Engineers (Carollo) have reviewed recent survey information on the percolation ponds and updated the analysis. The updated findings and recommendations are presented in this Project Memorandum.
1.2 Percolation Pond Investigation
The investigations discussed below were identified as Task 3 - Percolation Pond Investigation, in the June 2024 TSCP.
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.02.05 12:57:56-08'00'
PROJECT MEMORANDUM
REVISED FINAL / 2
1.2.1 Background
Table 1 of Attachment 1 to the Notice of Applicability (NOA), (attached in Attachment A), issued by the RWQCB on June 16, 2023, shows the "Permitted Design Flow, Average Monthly (Million gallons per day, mgd) of 8.0." In Section 2 above Table 2 of Attachment 1, the second paragraph states: "The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd." Table 2 lists the Wastewater Disposal Method as Percolation Ponds, 123 acres, and lists "Disposal Capacity (mgd)" as "8.0." These limits imply that the WWTP has a permitted average daily capacity of 8.0 mgd based on the listed disposal capacity of the percolation ponds. The stipulations noted above were based on information the City provided to the RWQCB during development of the NOA. As part of Task 3 of the TSCP, the City committed to investigate the pond capacity further and identify ways to improve performance, including developing a water balance, performing geological and hydrogeological sampling and testing, and developing recommendations for improved percolation. The TSCP laid out a schedule for completing this study by December 2024 as Milestone No. 5. The evaluation work was largely completed by December 2024, and the findings are presented in the sections below.
1.2.2 Study Findings
1.2.2.1 Soils Investigations
The Carollo team (including GSI Water Solutions [GSI] and Yeh and Associates, Inc. [Yeh]) reviewed historical data collected at the pond sites since 1995 and implemented a new sampling and testing program to assess pond performance using hydrogeological and geotechnical investigations and analysis.
Soils reports dating back to 2003 were reviewed, and based on the findings, additional soils investigations were identified. Generally, the quality of the soils in the borings and test pits was characterized as "Alluvium consisting of poorly graded sand with varying amounts of silt with layers of clay and silt." The layers of clay and silt vary across the ponds, but are typically in the range of 0.5 to 4.0 feet thick at different depths.
Yeh undertook additional field soil testing conducted in 2024, which included cone penetration tests, digging test pits, and laboratory testing of collected soil samples. The results confirmed dispersed layers of clay at shallow depths in some ponds and intermittently at deeper levels. An example of a subsurface profile developed by Yeh based on historical and recent soils investigations is shown in Figure 1. Yeh's 2025 geotechnical report is included as an appendix to Volume 7, Chapter 2 - Effluent Disposal of the Master Plan, a draft final version of which is included in Attachment B.
PROJECT MEMORANDUM
REVISED FINAL / 3
Figure 1 Subsurface Profile Example from Yeh's 2025 Report Based on Historical and Recent Data The outcome of the soils investigations and actions to be taken on the existing ponds to maintain and/or improve performance can be summarized as follows:
1. Short-term activities - focus on removal of the top 2 to 4 inches of soil which has accumulated fines and an organic layer which is restricting percolation.
2. Medium-term activities - develop an approach for systematic screening of soil in the ponds to a depth of 5 to 10 feet to remove clayey and silty soil. This approach was successful when carried out in some ponds several years ago and would begin with the poorest performing ponds first. It is anticipated that one or two ponds per year would receive soil screening.
3. Long-term activities - move to a wastewater treatment approach that limits the amount of suspended solids in the effluent sent to the ponds. In addition, develop a plan for ongoing planned maintenance of the ponds to address fines build-up in the surface layer and soil screening to address clayey and silty soil build-up in the 5 to 10 feet deep layer, to maintain percolation performance.
Based on these findings, Carollo developed budget cost estimates to carry out the short-, medium- and long-term activities associated with the existing ponds. Short-term activities are expected to cost around $100,000 over a 3-year period, while medium-term activities are expected to cost about $23 million and take about 5 years to complete. Long-term activities to reduce the mass of solids entering the ponds in the final effluent will be addressed through treatment plant upgrades as part of the Phase 1 Upgrade Project to address the new General Permit requirements, which is still in the planning phase. And ongoing maintenance needs will be addressed as needed based on the success/outcome of the short- and medium-term activities.
PROJECT MEMORANDUM
REVISED FINAL / 4
1.2.2.2 Water Balance
To assess the ability of the ponds to handle the WWTP's daily flows, information was gathered to establish a water balance across the pond system. An evaporation pan was set up near the ponds to measure rainfall and daily evaporation. Flow into the ponds was assessed based on daily influent flows to the WWTP, plus rainfall. The City rotates ponds based on influent flows and individual pond percolation rates, allowing time for drying and ripping before ponds are placed back in service. Figure 2 presents a hydrograph for Pond 1 developed by GSI as an example to show how the pond level varied between November 2023 and April 2024 and the corresponding evaporation rate. Over the 6-month period, measured evaporation rates roughly corresponded to rainfall.
Figure 2 Hydrograph for Percolation Pond 1
The City provided daily logs of the depth of water in each pond for the 18-month period from July 2023 to December 2024. In addition, the City carried out a series of aerial surveys of the existing ponds to capture topographical information of each pond when it was completely dry. These surveys were used to create a digital terrain model of the percolation pond area, from which accurate measurements of the current pond areas could be made. Figure 3 shows a topographical image of the percolation pond area obtained from the City's aerial survey data, and includes Ponds A-1, A-2, and A-3. The updated survey data shows that the average area of the active ponds is 80.4 acres.
PROJECT MEMORANDUM
REVISED FINAL / 5
The updated survey information was used to establish an average surface area of each pond, based on empty and full conditions. Then, using the daily water depth information, the daily volume of water held in each pond was calculated. The total volume of water that the ponds can hold was calculated using maximum pond water level, that is to the point at which the 2 feet of freeboard begins. Using this information, a daily water balance across the ponds was developed to assess the ability of the ponds to handle the daily influent flows, accounting for rainfall events and evaporation. More details are presented in Attachment B.
Figure 3 Topographical Survey Data for Percolation Ponds (2025) The ponds have a calculated total volume of about 870 acre-feet (AF) (284 million gallons), based on the updated survey data for each empty pond and the maximum water depth to the point of the required 2 feet of freeboard.
Figure 4 shows the daily influent flow to the WWTP for the 18-month period of July 2023 to December 2024. The yellow continuous line in Figure 4 is the 30-day moving average. The influent flow to the plant is a good measure of the treated effluent flow to the percolation ponds. Unaccounted for flow includes the water that is lost from the system with treated solids, and water that is added to the system through the use of City water for washing down and pump seal water, which is only about 26,000 gallons per day. Both of these flows are small compared to the influent flow and were assumed to offset each other.
Initially, for the first 60 days (July and August 2023), the recorded daily influent flow was around 8.5 mgd, and there were several days when the flow was above 9 mgd, both greater than the permitted flow.
However, after recalibration of the influent flowmeter early in September 2023, the influent flow dropped to around 7 mgd, and remained more or less stable since then, with the 30-day rolling average between about 6 and 7 mgd. However, as the data shows, even after the flowmeter recalibration, there are
PROJECT MEMORANDUM
REVISED FINAL / 6
individual days when the influent flow is well above 8.0 mgd, implying that more than the permitted flow of 8.0 mgd was flowing to the ponds.
Over the entire time period, the average flow to the ponds was 6.88 mgd. When including the net precipitation and evaporation, the average flow is equal to 6.92 mgd.
Figure 4 Daily Influent Flow to WWTP and 30-Day Rolling Average Figure 5 shows the variation of the daily volume of water in the percolation ponds for the 18-month period between July 2023 and December 2024. As shown, the total volume of water in the ponds varied between about 413 AF in July 2023 to a peak of about 680 AF in January/February 2024, during one of the wettest winters on record. As noted on Figure 5, the total pond capacity, excluding the 2 feet of freeboard, is about 870 AF.
PROJECT MEMORANDUM
REVISED FINAL / 7
Figure 5 Variation of Water Volume in Ponds (July 2023 to December 2024) The daily variation in total pond volume results from either an accumulation of water (through rainfall, poor percolation, increased effluent flow) or a loss of water (through evaporation, percolation, decreased effluent flow), as shown in Figure 6.
Figure 6 Schematic of Pond Water Balance Calculation
By accounting for the rainfall, evaporation, effluent flow, and daily change in total pond volume, the average volume of water lost through percolation can be determined. The average percolation on a monthly basis is illustrated in Figure 7. As indicated, the percolation rate varies throughout the period, with high values of 8.8 mgd and 8.4 mgd achieved in July/August 2023 and August 2024, respectively.
This is understandable because not all ponds are in service continuously. As mentioned earlier, ponds are rotated into and out of service to allow time for resting, followed by ripping and grading. In addition, as presented earlier, not all ponds have the same individual percolation rates, so a combination of ponds that includes the majority of "poor performers" will result in a lower overall percolation rate. Overall, over the 18-month period under review, the percolation ponds percolated an average of 6.84 mgd.
PROJECT MEMORANDUM
REVISED FINAL / 8
(blue column in Figure 7), roughly in line with the influent flow. This confirms that over the entire period, there was no net increase in the volume of water held in the ponds.
Figure 7 Calculated Monthly Average Volume Percolated
1.2.2.3 Pond Capacity
As mentioned, the maximum pond holding capacity was determined to be 870 AF, excluding the 2 feet of freeboard, and as shown in Figure 5, from the daily volume variation data the maximum observed volume reached was 677 AF, or about 78 percent of the maximum capacity. This means that 22 percent of the pond capacity was still available, implying that the ponds have capacity to dispose of additional flow.
As listed in the permit, the percolation disposal capacity is noted as a daily capacity and limited to
8.0 mgd. Clearly, from the daily plant influent data presented in Figure 4, the pond system has been receiving flow that exceeds 8.0 mgd at times, even after the calibration of the influent flowmeter. The City has had to report such violations based on the daily permitted flow, although the above analysis has shown that the pond capacity easily exceeds a daily average of 8.0 mgd. Therefore, to avoid such permit violations, it seems appropriate that the Water Board should adjust the permit language to state a monthly capacity.
The maximum volume that the ponds have held over the 18-month period under review, which included one of the wettest winter seasons on record, was 78 percent of the available volume, excluding the 2-foot freeboard volume which would add an additional roughly 18 percent to the volume. This suggests that the ponds could take on more flow and not be at risk of reaching their maximum capacity. This is supported by the calculated average volume of water percolated by the ponds on a monthly basis.
Figure 7 shows that the ponds can percolate well over 8 mgd on an average monthly basis, as well as a daily basis (Figure 4).
Using the monthly average percolated volumes, average percolation rates per acre were calculated. These are presented in Table 1 by month for 2024. As indicated, there is variability in the average monthly percolation rates, with high values (over 150,000 gallons/acre) achieved in July and August. The average
PROJECT MEMORANDUM
REVISED FINAL / 9
for the year was 114,254 gallons/acre. Applying this average rate to the total pond area available (80.4 acres) results in a maximum monthly percolated volume of 9.2 mgd for all ponds in service.
Table 1 Calculated Percolation Rates for 2024
Month Year Pond Acres in Service
(acres)
Monthly Percolation Rate
(gallons/acre)
July 2023 55.4 158,981
August 2023 56.5 154,150
September 2023 52.2 149,473
October 2023 55.6 131,530
November 2023 56.6 115,570
December 2023 60.7 93,242
January 2024 72.8 67,807
February 2024 71.8 87,324
March 2024 69.1 106,253
April 2024 61.6 126,777
May 2024 65.5 98,661
June 2024 57.7 129,090
July(1) 2024 55.2 95,436
August(1) 2024 61.2 135,214
September(1) 2024 55.7 115,137
October(1) 2024 56.3 104,694
November(1) 2024 54.7 97,405
December(1) 2024 69.6 89,830
Average 60.5(2) 114,254
Notes:
(1) Values from July through December include Ponds A-1, A-2, and A-3. (2) Represents 75.1% of total pond area of 80.4 acres.
Based on the data set available, we conclude that the pond capacity is greater than the listed value in the permit. The data shows that with all ponds in service, the maximum monthly percolation volume is
9.2 mgd. Being conservative and allowing for the largest pond out-of-service (7.7 acres) to accommodate pond rotation/maintenance, gives a monthly average working capacity of 8.3 mgd. Accordingly, using the approach of the largest unit out-of-service, a more reasonable permitted capacity for the ponds should be a monthly average capacity of 8.3 mgd. Using a monthly average value rather than a daily average value will prevent unnecessary flow violations associated with daily peak flows that occur periodically.
1.3 Summary Conclusions and Recommendations
This Project Memorandum has presented a summary of the recent investigations conducted by the City on their percolation ponds at the WWTP. More details can be found in the draft final version of Volume 7, Chapter 2 - Effluent Disposal, of the Master Plan, included in Attachment B. Volume 7, Chapter 2 summarized the historical and most recent soils information based on test pits and CPT measurements across a number of existing ponds.
PROJECT MEMORANDUM
REVISED FINAL / 10
The ponds are underlain by alluvium consisting of poorly graded sand with varying amounts of silt with layers of clay and silt. These layers of clay and silt vary across the ponds, but are typically in the range of
0.5 to 4.0 feet thick at different depths. Using the soils data, the City is developing a comprehensive operations and maintenance plan for long-term maintenance and rehabilitation of the ponds to firstly improve and then maintain consistent long-term performance. As part of this effort, the City is planning some short-term maintenance of the most poorly performing ponds, over the next 3 to 4 years, including removal of the top 2- to 4-inch biolayer, modifying the pond drying operation, and conducting a soil cleaning operation to remove a portion of the clay/silt layers present in the upper 5 to 10 feet of the ponds. This will be an ongoing process that will address a few ponds each year.
In addition, as part of the ongoing Master Planning process, new ponds will be required to support additional flow anticipated at the WWTP. The additional ponds are to be constructed on City-owned land to the east of Black Road, southeast of the existing WWTP. The approximately 40 acres of new percolation ponds are planned to be an early project to provide additional disposal capacity so the City will have more flexibility to take existing ponds out of service for the rehabilitation work mentioned above. Also, the planned WWTP improvements to meet the NOA effluent limits will significantly improve solids removal, thereby reducing organics and solids loading in the treated effluent to the ponds once the new facilities are in operation. The additional new ponds to the east of Black Road will require a modification to the permit to include the required land area in the plant description.
As part of the pond evaluation, the City completed a water balance to determine the volume of the ponds utilized on a daily basis. Of the total 870 AF of storage volume available, no more than 78 percent of the storage was used during the 18-month period of July 2023 to December 2024. That maximum storage level was reached in February/March 2024, an unusually wet year for Santa Maria. The average storage volume used for the period was 462 AF, about 53 percent of the total available. Based on the water balance assessment and the updated survey information, the following conclusions and recommendations can be made:
1. The listed pond area in the new General Permit is 123 acres. The most recent aerial survey data has shown that the actual pond percolation area is 80.4 acres.
2. The findings from the water balance exercise showed that, despite the noted decrease in percolation rates, the ponds are able to dispose of all flow that they receive. In fact, based on a detailed assessment over 18 months of operation, the ponds never accumulated more than 78 percent of their total holding capacity, indicating that the ponds can dispose of more flow than they currently receive.
3. Even during the unusually high rainfall season, February/March 2024, when the pond volume peaked, there was at least 22 percent of the total pond volume available for additional storage, excluding the freeboard volume (which represents an additional 18 percent), should it have been needed.
4. As listed in the new General Permit, the percolation disposal capacity is noted as a daily capacity and limited to 8.0 mgd. Daily plant influent data shows that the ponds have received flows that exceed
8.0 mgd at times, even after the recalibration of the influent flowmeter in September 2023. As a result of these periodically "high" daily average flows, the City is having to report these events as violations based on the daily permitted flow. The water balance analysis clearly shows that the pond capacity easily exceeds a daily average of 8.0 mgd. Based on the data available, and assuming that the pond system always has an equivalent of the largest pond out-of-service, it is recommended that the permitted capacity for the ponds be modified to a monthly average capacity of 8.3 mgd. Such a modification to the permit will prevent unnecessary permit flow violations. In addition, the
PROJECT MEMORANDUM
REVISED FINAL / 11
recommended change to the permit language should also see the City through to the point where additional pond capacity has been constructed, after which the monthly average flow capacity can be adjusted again.
PROJECT MEMORANDUM
REVISED FINAL
ATTACHMENT A NOTICE OF APPLICABILITY
Central Coast Regional Water Quality Control Board
June 16, 2023 Sent Via Electronic Mail
Shad Springer, Director of Utilities
City of Santa Maria – Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:
• NOTICE OF APPLICABILITY FOR ENROLLMENT IN ORDER NO. R3-2020- 0020, GENERAL WASTE DISCHARGE REQUIREMENTS FOR DISCHARGES
FROM DOMESTIC WASTEWATER SYSTEMS WITH FLOWS GREATER
THAN 100,000 GALLONS PER DAY;
• TRANSMITTAL OF MONITORING AND REPORTING PROGRAM NO. R3- 2023-0032; AND
• TERMINATION OF INDIVIDUAL PERMIT, WASTE DISCHARGE
REQUIREMENTS ORDER NO. R3-2010-0001 FOR THE CITY OF SANTA MARIA WASTEWATER FACILITY, SANTA BARBARA COUNTY.
The Central Coast Regional Water Quality Control Board (Central Coast Water Board) reviewed the August 5, 2022, notice of intent and available documents associated with City of Santa Maria’s domestic wastewater treatment facility (Wastewater System) located at 601 Black Road in Santa Maria, California. The Wastewater System, owned by the City of Santa Maria is currently regulated pursuant to Waste Discharge Requirements Order No. R3-2010-0001 for the City of Santa Maria Wastewater Facility, Santa Barbara County (Order No. R3-2010-0001).
On September 25, 2020, the Central Coast Water Board adopted General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).
This letter serves as a notice of applicability for enrollment in the General Permit. This letter includes: wastewater system operation summary, specific requirements, and City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
limitations (Attachment 1); figures (Attachment 2); and City of Santa Maria’s monitoring and reporting program requirements (Attachment 3).
This letter also serves as a notice of termination of City of Santa Maria’s coverage in existing individual permit, Order No. R3-2010-0001.
City of Santa Maria must comply with the following:
1. General Permit – City of Santa Maria must comply with all conditions and requirements of the General Permit. As described in the General Permit, ongoing operation, maintenance, monitoring, and reporting are required. A copy of the General Permit can be found electronically at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/r32020_0020.pdf
2. Monitoring and Reporting Program – City of Santa Maria must comply with the requirements of the monitoring and reporting program enclosed with this letter (monitoring and reporting program no. R3-2023-0032, Attachment 3). City of Santa Maria must start implementing the monitoring on October 1, 2023. The first quarterly monitoring report is due February 1, 2024 and the first annual report is due March 1, 2024. City of Santa Maria is also required to submit an annual pretreatment program report1 due on March 1st and the annual volumetric reporting requirements2 established by the State Water Resources Control Board (State Water Board), due April 30th. Annual reports must be submitted to the GeoTracker database.
Quarterly monitoring reports and annual reports must be provided electronically in searchable PDF with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed. https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater _permitting/docs/transmittal_sheet.pdf
All annual reports must be formatted and completed as specified in the annual report template found at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf
City of Santa Maria must submit all reports/documents and laboratory data (using the transmittal sheet as the cover page) to the publicly accessible State Water 1 California Code of Regulations title 23 section 2233 View Document - California Code of Regulations (westlaw.com)
2 See: Volumetric Annual Reporting | California State Water Resources Control Board City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Board’s GeoTracker3,4 database with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System – specific global identification number WDR100029526 over the internet at:
https://geotracker.waterboards.ca.gov/esi/login.asp
The attached monitoring and reporting program outlines the GeoTracker electronic reporting requirements. The Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.
3. Fees – City of Santa Maria paid an annual fee of $123,934.00 on January 24, 2023 for coverage in existing individual permit, Order No. R3-2010-0001. This payment covers City of Santa Maria‘s enrollment in the General Permit for the 2022-2023 fiscal year.
City of Santa Maria must pay an annual fee to maintain coverage in the General Permit. Annual fees are determined by the State Water Board’s fee program and cover the state fiscal year of July 1 through June 30. The Central Coast Water Board has lowered your assigned threat and complexity rating to 2A which will result in a reduced annual fee (currently $41,063) starting with the 2023-2024 fiscal year. A copy of the current state fee schedule is available electronically at the following link:
https://www.waterboards.ca.gov/resources/fees/water_quality/#wdr
4. Notification – The Central Coast Water Board will be notified of City of Santa Maria’s enrollment at a regularly scheduled public meeting on August 24-25, 2023. Details about that meeting are available on our website at:
https://www.waterboards.ca.gov/centralcoast/board_info/agendas/
5. Future Discharge Modifications – Pursuant to California Water Code section 13260, City of Santa Maria must inform the Central Coast Water Board at least 120 days prior to modifying your discharge. If there are any significant changes in either treatment or disposal methodologies, or the volume or character of the treated wastewater, City of Santa Maria must notify the Central Coast Water Board immediately of such changes.
3 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/ 4 Additional information available at: http://geotracker.waterboards.ca.gov/ City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Attachment 1 contains the Central Coast Water Board’s understanding of the Wastewater System located at 601 Black Road, Santa Maria, CA 93458. Please review Attachment 1 to determine if the description is representative of your current system. Pursuant to California Water Code section 13267, City of Santa Maria must notify the Central Coast Water Board if this information is out of date or incorrect. You are required to provide staff with your updated information within 30 days of issuance of this letter.
6. Responsible Party – City of Santa Maria is responsible for the management and disposal of the domestic wastewater in compliance with the conditions of the General Permit. Any noncompliance with this General Permit constitutes a violation of the California Water Code, and subjects City of Santa Maria to enforcement action, and termination of enrollment under this General Permit.
7. Change in Ownership - In the event of any change in control or ownership of the property, City of Santa Maria must notify the succeeding owner or operator of the existence of this General Permit by letter, a copy of which shall be immediately forwarded to the Central Coast Water Board so that the new owner or operator can be enrolled in the General Permit and City of Santa Maria’s enrollment in the General Permit can be terminated.
8. Certified Operator – City of Santa Maria is required to comply with the operator certification requirements5 administered by the State Water Board’s Office of Operator Certification, which currently requires a Grade IV certified operator onsite to maintain and operate the Wastewater System. The City of Santa Maria must:
a. Keep a current Wastewater Treatment Plant Classification Form on file with the Office of Operator Certification and update the form when modifications to the Wastewater System treatment processes occur. b. Provide the Office of Operator Certification with a Chief Plant Operator Acknowledgement Form and update this information within 30 days of a change of Chief Plant Operator.
c. If a contractor operator is used, the contract operator must register with the Office of Operator Certification and obtain a contract operator certificate for the Wastewater System.
Forms are available at the following link:
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/for m.html
5 Title 23 Division 3. Chapter 26 Wastewater Treatment Plant Classification, Operator Certification and Contract Operator Registration.
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/docs/ocr_clean.pdf City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
9. Termination of Permit – The existing individual permit, Order No. R3-2010-0001 is terminated, except for enforcement purposes.6 City of Santa Maria is responsible for compliance with Order No. R3-2010-0001 prior to the date of this letter.
10.Compliance Plan – As required in the attached monitoring and reporting program, City of Santa Maria must, by June 16, 2024, prepare and submit for Central Coast Water Board review and approval a time schedule compliance plan.
If you have any questions, please contact Cecile Blancarte at (805) 542-4782 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].
Sincerely,
for Matthew T. Keeling
Executive Officer
Attachments:
Attachment 1: Wastewater System Operation Summary, Specific Requirements, and Limitations
Attachment 2: Figures
Attachment 3: Monitoring and Reporting Program Order No. R3-2023-0032
cc:
Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Office of Operator Certification, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Jesse Woodard, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
6 The General Permit states “… where a Wastewater System discharge is currently regulated by an individual permit, that permit is terminated upon the enrollment of the Wastewater System into this General Permit.”
Jennifer Epp Digitally signed by Jennifer Epp
Date: 2023.06.15 16:19:26
-07'00'
City of Santa Maria - 6 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ECM/CIWQS = CW-255678
GeoTracker No. = GT- WDR100029526
Rev 12/21/2022
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant NOA for R3- 2020-0020
\\ca.epa.local\rb\rb3\shared\wdr\wdr facilities\santa barbara co\santa maria wwtp\order 2020- 0020\final\santa maria r3-2020-0020 noa_final.docx
ATTACHMENT 1
WASTEWATER SYSTEM OPERATION SUMMARY, SPECIFIC REQUIREMENTS,
AND LIMITATIONS
1. OWNERSHIP AND WASTEWATER SYSTEM INFORMATION
Ownership and wastewater system information submitted by City of Santa Maria to the Central Coast Water Board is shown in Table 1.
Table 1. Ownership and Wastewater System Information
Name City of Santa Maria Wastewater
Treatment Plant
Physical Address 601 Black Road Santa Maria, CA 93458
Lattitude 34°56'54.93"N
Longitude 120°29'49.59"W
Mailing Address 2065 E. Main Street, Santa Maria, CA
93454
Owner City of Santa Maria
Operator
Russ P. Newman
phone: (805) 925-0951 x721
e-mail: [email protected]
Legally Responsible Official
Shad Springer
phone: (805) 925-0951 x7211
e-mail: [email protected]
Raw Wastewater
Characteristics
Sewer Connections: 22,020
Population Served: 107,407
Domestic (%): 91%
Industrial (%): 9%
Permitted Design Flow,
Average Monthly (Million
gallons per day, mgd)
8.0 Baseline Flow (average
annual flow) in mgd
7.2 Threat to Water Quality 2
Complexity B
For Internal Use
Fee Code 58
Primary Place Type Wastewater Treatment Facility
Facility Type Municipal/Domestic
Facility Waste Type Domestic Wastewater
Regulatory measure Type Enrollee - WDR
Reclamation Included No
EPA Approved Pretreatment
Program
Yes
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
2. WASTEWATER SYSTEM OPERATION SUMMARY
The City of Santa Maria wastewater treatment facility (Wastewater System) is a Class IV wastewater system. City of Santa Maria must staff a Grade IV chief plant operator for proper operation of the Wastewater System. The current chief plant operator is Russ P.
Newman, Grade IV, Operator No. 29543, Certificate No. 28863 (expires 1/18/2026).
The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd. The Wastewater System consists of the treatment technologies and treatment capabilities shown in Table 2.
Table 2. Treatment Technology and Capacity
Headworks/Preliminary
Treatment
The headworks consists of a Parshall flume flow meter,
three automatic bar screens followed by two aerated grit chambers.
Headworks capacity (mgd): 13.5
Primary Treatment
Clarifiers: Primary treatment consists of two primary
clarifiers that operate in parallel. The volume of each clarifying tank is 1.32 million gallons.
Primary treatment capacity (mgd): 27.92
Secondary Treatment
Trickling Filters: Secondary treatment is performed using two primary and two secondary aerobic trickling filters.
Each of the primary trickling filters has a volume of
543,000 gallons. Each of the secondary trickling filters has a volume of 170,000 gallons.
Secondary treatment capacity (mgd): 17.7
Tertiary Treatment Not Applicable
Tertiary treatment capacity (gpd): 0
Disinfection Not Applicable
Disinfection Capacity (gpd): 0
Wastewater Disposal
Method
Percolation Ponds, 123 acres
Disposal capacity (mgd): 8.0
Biosolids/Sludge
Production and
Handling
Gravity Thickeners (2), Anaerobic Digestors (4), and
Sludge Drying Beds, Offsite Composting, and Landfilling Annual production of biosolids: 1,811 tons
The final destination of biosolids produced is hauled off to Engel and Gray Composting, Inc. located at 468-594 Ray
Road, Santa Maria, California, and the City of Santa Maria Landfill, 2065 E. Main Street, Santa Maria, California
Non-Potable Recycled
Water
Non-potable recycled
water produced onsite: Not Applicable
Recycled water usage
areas: Not Applicable
City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Enrolled in WQ 2016-
0068-DDW: Not Applicable
Recycled water production
volume (gpd): Not Applicable
A summary of historic and recent average effluent concentrations is included in Table 3, which were reported in City of Santa Maria quarterly monitoring reports. The Central Coast Water Board used reported effluent water quality data to establish the effluent and groundwater limitations in section 3.
Table 3. Effluent Water Quality for Select Constituents Constituents Unit [1][2] Historical
Average[3]
Annual Average
for 2022[4]
Carbonaceous Biochemical
Oxygen Demand, 5-Day[5] mg/L 43 45
Total Suspended Solids mg/L 39 37
Total Dissolved Solids mg/L 844 1,055
Chloride mg/L 156 143
Sodium mg/L 145 140
Sulfate mg/L 196 320
Boron mg/L 0.35 0.41
Total Nitrogen mg/L 43 42
Settleable Solids ml/L[4] <0.1 <0.1
pH Standard
Units 8 7.8
[1] mg/L denotes milligrams per liter.
[2] ml/L denotes milliliters per liter.
[3] Based on water quality data reported by City of Santa Maria in their 2018 to 2022 monitoring reports. [4] Based on water quality data reported by City of Santa Maria in the 2022 Annual Monitoring Report. [5] The City of Santa Maria has been reporting carbonaceous biochemical oxygen demand (CBOD) instead of biochemical oxygen demand (BOD). Monitoring and reporting program no. R3-2023-0032 requires the City of Santa Maria to report BOD.
3. WASTEWATER SYSTEM SPECIFIC REQUIREMENTS AND LIMITATIONS City of Santa Maria must operate the Wastewater System in accordance with the General Permit and this notice of applicability. City of Santa Maria must comply with the wastewater specific limitations specified in Table 4 through Table 8.
Flow limitations are shown in Table 4. Interim effluent limitations shown in Table 5 apply until June 16, 2025. After June 16, 2025, effluent limitations shown in Table 6 and Table 7 apply.
A. Flow Limitations:
Table 4. Flow Limitations
Flow Units Limit Point of
Compliance
Maximum Daily Flow to Disposal Ponds mgd 8.0 Influent IS-1 City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
B. Effluent Limitations:
Based on reported water quality data, effluent water quality for Carbonaceous Biochemical Oxygen Demand and Total Suspended Solids (TSS) (see Table 3) exceed the General Permit effluent limits for a trickling filter treatment system. Therefore, pursuant to the General Permit, City of Santa Maria can comply with their individual permit No. R3-2010-0001 5-day Biochemical Oxygen Demand (BOD5) and TSS limits for two years. After June 16, 2025, trickling filter effluent limitations shown in Table 6 apply.
Table 5. Interim Effluent Limitations: Trickling Filters (Until June 16, 2025) Constituent Units 30-Day
Average
Daily
Maximum
Biochemical Oxygen Demand, 5-Day mg/L 60 100
Total Suspended Solids mg/L 60 100
Settleable Solids mL/L 0.1 0.4
Total Dissolved Solids1 mg/L 1,000 Not Applicable
Sodium1 mg/L 180 Not Applicable
Chloride1 mg/L 180 Not Applicable
pH Standard
Units
Between 6.5
and 8.4
Between 6.5
and 8.4
[1] Compliance shall be based on a three-year running mean.
Table 6. Effluent Limitations[1] (After June 16, 2025)
Constituent Units 30-Day
Average
7-Day
Average
Sample
Maximum
Biochemical Oxygen
Demand, 5-Day mg/L 30 45 Not Applicable
Total Suspended Solids mg/L 30 45 Not Applicable
Settleable Solids mL/L 0.1 0.3 0.5
pH Standard
Units
Between 6.5
and 8.4
Not
Applicable Not Applicable
[1] The Central Coast Water Board understands that the City of Santa Maria will be upgrading the Wastewater System to comply with the new effluent limitations. Pursuant to General Permit Tables 3 through 5, the values in this table will vary depending on the treatment technology chosen. By June 16, 2024, the City of Santa Maria must report to the Central Coast Water Board the treatment technology chosen for the upgrades such that this notice of applicability can be updated as needed.
Table 7. Effluent Limitations (After June 16, 2025)
Based on - Upper Guadalupe Groundwater Basin
Constituents Units 25-Month Rolling Median[1]
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 105
Sulfate mg/L 500
Boron mg/L 0.5
City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Constituents Units 25-Month Rolling Median[1]
Total Nitrogen mg/L 10
[1] Rolling Median is the median from all data collected over the most recent 25 months.
C. Groundwater Limitations:
Based on review of historical effluent water quality (see Table 3), City of Santa Maria is currently unable to consistently comply with the General Permit effluent limitations for total nitrogen. The Central Coast Water Board understands that the City of Santa Maria will be designing upgrades to the Wastewater System to comply with the General Permit and will be providing a time schedule compliance plan as described in monitoring and reporting program no. R3-2023-0032. In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent. Option 1 is to comply with the effluent limits in Table 7.
Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan including the limitations listed in Table 8.
Table 8. Groundwater Limitations
for Designated Groundwater Basin – Upper Guadalupe Groundwater Basin Constituents Units 25-Month Rolling Median
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 230
Sulfate mg/L 500
Boron mg/L 0.5
Total Nitrogen mg/L 1.4
City of Santa Maria - 1 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ATTACHMENT 2
FIGURES
Figure 1 - Vicinity Map
City of Santa Maria
Wastewater
Treatment Plant
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 2- City of Santa Maria Wastewater Treatment Plant Site Map City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 3 - Process Flow Schematic
CENTRAL COAST REGIONAL WATER QUALITY CONTROL BOARD
MONITORING AND REPORTING PROGRAM NO. R3-2023-0032
June 16, 2023
MODIFICATION OF MONITORING AND REPORTING PROGRAM NO. R3-2020-0020 FOR
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT
SANTA MARIA, SANTA BARBARA COUNTY
This Monitoring and Reporting Program applies to the monitoring and reporting requirements for the City of Santa Maria Wastewater Treatment Plant (Wastewater System) enrolled in General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).
The City of Santa Maria owns and operates the Wastewater System that is subject to the General Permit and notice of applicability. The City of Santa Maria must not implement any changes to this monitoring and reporting program unless and until a revised monitoring and reporting program is issued by the Central Coast Regional Water Quality Control Board (Central Coast Water Board).
The State Water Resources Control Board (State Water Board) and Regional Water Quality Control Boards are transitioning to the use of the publicly accessible State Water Board’s GeoTracker database for the tracking of environmental and regulatory data for sites that operate under waste discharge requirements. The monitoring and reporting program directs the City of Santa Maria to submit reports (both technical and monitoring reports) and analytical data electronically to the State Water Board’s GeoTracker database (see monitoring and reporting program section VI.C).
I. SAMPLING AND ANALYSIS
The City of Santa Maria must collect representative samples in accordance with the most recently approved sampling and analysis plan contained in the Operations and Maintenance Manual and validate analytical results prior to submittal to the Central Coast Water Board. All samples (e.g., wastewater, groundwater, soil, sludge) must be representative of the volume and nature of the discharge or matrix of materials sampled.
All samples must be collected by a qualified person, trained in proper procedures for collecting the samples. The name of the sampler, sample type (grab or composite), time, date, location, bottle/container type, and any preservative used for each sample must be recorded on the sample chain of custody form. The chain of custody form must also contain all custody information including date, time, and to whom samples were relinquished. If composite samples are collected, the basis for sampling (time or flow weighted) must be included in the sampling and analysis plan contained in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
2 Operations and Maintenance Manual for Central Coast Water Board review and approval.
A. Sampling Schedule – Unless otherwise specified below, sampling must be performed in accordance with Table 1.
Table 1. Sampling Schedule
Monitoring Period Sample Collection Time
Quarterly January, April, July, and October
Semiannual April and October
Annual October
Field test instruments (such as those used to evaluate pH, dissolved oxygen, and electrical conductivity) may be used if they are used by a State Water Board Environmental Laboratory Accreditation Program accredited laboratory, or:
1. The user is trained in proper use and maintenance of the instruments;
2. The instruments are field calibrated prior to monitoring events at the frequency recommended by the manufacturer;
3. Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency; and
4. Field calibration reports are maintained and available for at least three years.
B. Monitoring Location Descriptions – All samples including influent samples (IS), effluent samples (ES), and groundwater monitoring wells (MW) must be collected at the locations described in Table 2. These locations must be consistent with the Central Coast Water Board approved sampling and analysis plan. The City of Santa Maria must upload the GeoTracker field point information for each sampling location in the GeoTracker database once, prior to uploading laboratory data (see Table 10).
Table 2. Sample Identification Details
GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Influent Sample IS-1 Raw wastewater sample collected
at the headworks
Effluent Sample ES-1
Treated wastewater sample
collected downstream of the
secondary clarifiers
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
3 GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Effluent Sample
ES-A, ES-1a, ES-2 through
ES-8, ES-11 through ES-15,
and ES-DKC
Treated wastewater sample
collected from the percolation
ponds
Monitoring Well MW-5H
Background Groundwater
Monitoring Well
Top of casing elevation unknown
Perforations 160 to 602 ft bgs
Monitoring Well MW-UMW1
Groundwater Monitoring Well
Top of Casing Elevation 175.6 ft
amsl
Screened elevations unknown
Monitoring Well MW-DMW1
Groundwater Monitoring Well
Top of Casing Elevation 158.16 ft
amsl Screened 87 to 135 ft bgs
Monitoring Well MW-DMW2
Groundwater Monitoring Well
Top of Casing Elevation 157.2 ft
amsl
Screened 82 to 155 ft bgs
Water Supply
Well
WSW-1[3] Representative sample from
potable well serving the city
[1] ft amsl denotes feet above mean sea level.
[2] ft bgs denotes feet below grade surface.
[3] Water supply sample data should be included in the annual report but does not need to be uploaded to GeoTracker if the Central Coast Water Board approves submittal of a Well Identification Number pursuant to the Water Supply Monitoring section below.
II. WATER SUPPLY MONITORING
Representative samples of the City of Santa Maria’s raw water supply (sampled before use or treatment) must be collected and analyzed, at a minimum, for constituents specified in Table 3.
In lieu of the required water supply sampling, the City of Santa Maria may request Central Coast Water Board approval to submit a Well Identification Number and the reporting year’s consumer confidence report (annual water quality report or drinking water quality report), as required by the State Water Board Division of Drinking Water and/or county, provided, at a minimum, all of the required constituents are sampled at the frequency specified in Table 3. The City of Santa Maria must report the results of any constituent monitored more frequently than is required by the monitoring program shown in Table 3. The City of Santa Maria must also report detectable concentrations (above the reporting limit) for any other constituent that has a published maximum contaminant level (MCL).
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
4 The City of Santa Maria must evaluate and provide a tabular summary of the water supply data with the annual monitoring report.
Table 3. Water Supply Monitoring
Constituent Units[1] Sample Type Sampling Frequency
Nitrate (as N) mg/L Grab Annually
Total Dissolved Solids mg/L Grab Annually
Chloride mg/L Grab Annually
Sodium mg/L Grab Annually
Sulfate mg/L Grab Annually
Boron mg/L Grab Annually
Carbonate mg/L Grab Annually
Bicarbonate mg/L Grab Annually
Calcium mg/L Grab Annually
Potassium mg/L Grab Annually
Magnesium mg/L Grab Annually
[1] mg/L denotes milligrams per liter.
III. INFLUENT AND EFFLUENT MONITORING
A. Influent Flow Monitoring – The City of Santa Maria must monitor and report flow in million gallons per day, as described in Table 4, with each monitoring report. See monitoring and reporting program section VI.A.4 for supplemental volumetric annual reporting requirements established by the State Water Board.
Table 4. Influent Flow Monitoring
Parameter Sample Type Sampling Frequency Sample Location Daily Flow Metered Daily IS-1
Maximum
Daily Flow Metered Monthly IS-1
Mean Daily
Flow Calculated Monthly IS-1
Percent of
Permitted
Flow [1]
Calculated Quarterly IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
5 [1] The General Permit notice of applicability specifies the Wastewater System’s maximum permitted flow. In the monitoring reports, the City of Santa Maria must evaluate and provide a comparison of monitored flow to the permitted flow.
B. Wastewater System Monitoring – Representative samples of The City of Santa Maria’s influent (raw wastewater) into the Wastewater System and effluent (treated wastewater) discharged to percolation ponds must be collected and analyzed in accordance with the treatment technology-based monitoring requirements (including sample type and frequency) summarized in the tables below. See Figure 1 for the location of samples and GeoTracker field points.
Figure 1. Process Flow Diagram and Sample Locations Referenced in Table 2
IS-1
ES-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
6 Figure 2. Percolation Pond and Groundwater Monitoring Well Sample Locations Referenced in Table 2
ES-2
ES-3
ES-4
ES-1a
ES-5
ES-6
ES-7
ES-8
ES-DKC
ES-12
ES-11
ES-14
ES-13
ES-15
MW-DMW1
MW-DMW2
MW-UMW1
ES-1
IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
7 Figure 3. Water Supply and Groundwater Monitoring Well Sample Locations Referenced in Table 2
1. Pond System Monitoring
i. Required Pond Monitoring – All wastewater treatment and treated wastewater storage/disposal ponds (lined and unlined) must be monitored as specified in Table 5. Sampling for dissolved oxygen must be a grab sample taken from 1 foot below pond surface1.
Observations do not need to be reported in the monitoring reports unless a violation, significant change, or treatment issue is observed. Photos of the pond(s) verifying the observations must be collected annually and included in the annual report, with the date and location of the photo clearly marked. Observations must be noted in a logbook or database and made available to the Central Coast Water Board upon request. Any problems must be promptly corrected and recorded.
1 Pond dissolved oxygen sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.
MW-5H
MW-DMW2
MW-DMW1
MW-UMW1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
8 Table 5. Wastewater Treatment/Storage/Disposal Pond Monitoring Parameter/
Constituent Units Sample Type Sampling/Monitoring
Frequency
Freeboard 0.1 feet Measured Weekly
Dissolved Oxygen
(in pond)
[4] mg/L Grab Monthly
Sludge Depth[1] 0.1 feet Measured Annually
Color Not
applicable Observation Monthly
Vegetation in and
surrounding ponds
Not
Applicable Observation Monthly
Berm condition Not
Applicable Observation Monthly
Precipitation inches/day
and date Measured [2] Each precipitation event [3]
[1] Sludge depth will not be required at disposal ponds if the disposal pond was dried and scarified within the reporting year. The annual report must provide dates of when the disposal ponds have been dried and scarified.
[2] The City of Santa Maria may use a rain gauge or use a National Oceanic and Atmospheric Administration, United States Geological Survey, or California Irrigation Management Information System weather station, such as http://scacis.rcc-acis.org/. [3] A precipitation event is one producing precipitation of ½ inch or more. [4] Pond sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.
2. Trickling Filter System Monitoring
i. Influent and Effluent Monitoring – At a minimum, influent and effluent constituent monitoring for the trickling filter system must be monitored as specified in Table 6.
Table 6. Influent and Effluent Monitoring for Trickling Filter Systems
INFLUENT
(IS-1)
INFLUENT
(IS-1)
EFFLUENT
(ES-1)
EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
pH units Grab Weekly Grab Weekly
Biochemical
Oxygen Demand,
5-Day
mg/L 24-hour
composite Quarterly 24-hr composite Monthly
Total Suspended
Solids mg/L 24-hour composite Quarterly 24-hr composite Monthly Settleable Solids ml/L Not
Required Not Required Grab Weekly
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
9 INFLUENT
(IS-1)
INFLUENT
(IS-1)
EFFLUENT
(ES-1)
EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
Total Nitrogen[2] mg/L Calculated Quarterly Calculated Monthly Nitrate (as N) +
Nitrite (as N) mg/L 24-hour composite Quarterly Grab Monthly Total Kjeldahl
Nitrogen (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Ammonia (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Total Dissolved
Solids mg/L 24-hour
composite Quarterly Grab Monthly
Chloride mg/L 24-hour
composite Quarterly Grab Monthly
Sodium mg/L 24-hour
composite Quarterly Grab Monthly
Sulfate mg/L 24-hour
composite Quarterly Grab Monthly
Boron mg/L Not
Required Not Required Grab Monthly
Carbonate mg/L Not
Required Not Required Grab Semiannually
Bicarbonate mg/L Not
Required Not Required Grab Semiannually
Calcium mg/L Not
Required Not Required Grab Semiannually
Potassium mg/L Not
Required Not Required Grab Semiannually
Magnesium mg/L Not
Required Not Required Grab Semiannually
[1] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.
IV. SLUDGE/BIOSOLIDS DISPOSAL MONITORING
The City of Santa Maria must report the handling and disposal of all sludge/biosolids generated at the Wastewater System. Records must include the date removed from the Wastewater System, name/contact information for the hauling company, the type and volume of waste transported, the disposal facility name and address, and copies of analytical data required by the entity accepting the waste. These records must be submitted as part of the annual monitoring report.
The City of Santa Maria must also monitor sludge/biosolids consistent with a Central Coast Water Board approved sludge management plan and in accordance with the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
10 requirements specified by the receiving party, including a regulated landfill and/or regulated composting facility.
If sludge/biosolids are not removed during the year, the City of Santa Maria must explain the absence of this monitoring in the annual report.
V. GROUNDWATER MONITORING
A. General Permit section V.A.2 provides two choices for compliance, effluent limitations, or groundwater monitoring.
In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent.
Option 1 is to comply with the effluent limits (refer to notice of applicability Table 7).
Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan (refer to notice of applicability Table 8).
Existing upgradient and downgradient groundwater monitoring wells are located within the percolated effluent mound at the Wastewater System. The current monitoring well network is not adequate for the assessment of upgradient background water quality and/or downgradient water quality trend for the City of Santa Maria Wastewater System (Fugro 2007)2.
By June 16, 2024, (with the time schedule compliance plan) the City of Santa Maria must notify the Central Coast Water Board of the city’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).
If the City of Santa Maria chooses Option 2 for any constituent, by October 16, 2024, the City of Santa Maria must:
1. Submit a groundwater monitoring workplan and preliminary hydrogeologic conceptual site model for Central Coast Water Board approval. At a minimum, the workplan must propose the installation of three shallow groundwater monitoring wells to establish groundwater gradient, groundwater flow velocity and direction, and evaluate downgradient groundwater quality influenced by the wastewater disposal. The number and location of the proposed groundwater monitoring well network must be on a scale sufficient to determine potential impacts and be sufficiently representative of groundwater conditions upgradient and downgradient of the permitted disposal/dispersal area. The groundwater 2 Hydrogeologic and Water Quality Review of Groundwater Conditions for the Wastewater Treatment Plant, Santa Maria, California. Fugro West, Inc. September 2007 MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
11 monitoring wells should not be installed prior to Central Coast Water Board approval of the groundwater monitoring workplan and preliminary hydrogeologic conceptual site model.
The groundwater monitoring wells must be installed within first encountered groundwater and in accordance with California Department of Water Resources Bulletin No. 74-81 and Supplement No. 74-90, California Water Code sections 13710 through 13755, and any local permitting requirements. The locations and top-of-casing elevations for the newly installed monitoring wells must be surveyed by a licensed land surveyor. The City of Santa Maria must install3 the Central Coast Water Board approved groundwater monitoring well network within 90 days of receiving Central Coast Water Board approval.
2. Once installed, all monitoring wells designated as part of the monitoring well network must be, at a minimum, sampled and analyzed as specified in Table 7 and the Central Coast Water Board approved sampling and analysis plan (see section VI.A.2.i of the General Permit).
Prior to sampling, depth to groundwater must be measured and groundwater elevations4 must be calculated. The monitoring wells must be purged of at least three well volumes and until measurements of the following parameters have stabilized (i.e., are reproducible within 10 percent): pH, temperature, dissolved oxygen, electrical conductivity, and turbidity. No-purge, low-flow, or other sampling techniques are acceptable only if they are approved in advance by the Central Coast Water Board and described in an approved sampling and analysis plan. Once the groundwater level in each of the wells has recovered sufficiently to ensure the collection of representative groundwater samples, a qualified individual (e.g., consultant, technician) trained in using proper sampling methods must recover samples using approved USEPA methods. Laboratories analyzing groundwater samples must be accredited by the State Water Board Environmental Laboratory Accreditation Program, in accordance with California Water Code section 13176, and must include quality assurance/quality control data with their reports.
The City of Santa Maria must provide monitoring well field sheets and report monitoring data, as described in Table 7, with each monitoring report.
3. Groundwater monitoring must include and must be consistent with Table 7 if Option 2 is chosen. Some constituents in Table 7 may be removed by the Central 3 Well installation must be supervised by a California licensed Civil Engineer or Professional Geologist. 4 The locations and top-of-casing elevations for the existing groundwater monitoring wells must be surveyed by a licensed land surveyor if not already completed at the time of installation.
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
12 Coast Water Board if compliance for that constituent is chosen by the City of Santa Maria to be an effluent limitation.
Table 7. Groundwater Monitoring if Option 2 is Chosen
Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation [1] 0.01 ft amsl Calculated Quarterly Depth to Groundwater [1] 0.01 ft bgs Measurement Quarterly Gradient feet/feet Calculated Quarterly
Groundwater Flow Direction [2] degrees Calculated Quarterly Total Nitrogen[3] mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Total Dissolved Solids mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
Carbonate mg/L Grab Semiannually
Bicarbonate mg/L Grab Semiannually
Calcium mg/L Grab Semiannually
Potassium mg/L Grab Semiannually
Magnesium mg/L Grab Semiannually
pH pH Units Metered Quarterly
Dissolved Oxygen mg/L Metered Quarterly
Phenol [4] mg/L Grab Annual
Formaldehyde [4] mg/L Grab Annual
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
13 Constituent Units Sample
Type
Sampling
Frequency
Zinc [4] mg/L Grab Annual
[1] ft amsl denotes feet above mean sea level and ft bgs denotes feet below ground surface. [2] Calculations must be prepared by, or under the responsible charge of, a California licensed professional.
[3] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.
[4] Sampling required once every five years if not detected in initial sample.
4. Groundwater monitoring reports, workplans, and other technical reports that interpret groundwater data must be prepared and stamped by a California licensed civil engineer or professional geologist.
B. GROUNDWATER MONITORING PRIOR TO OCTOBER 16, 2024
Table 8. Groundwater Monitoring Prior to October 16, 2024 Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation 0.01 ft amsl Calculated Quarterly Depth to Groundwater 0.01 ft bgs Measurement Quarterly
Total Nitrogen mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
VI. REPORTING REQUIREMENTS
A. QUARTERLY AND ANNUAL MONITORING REPORTS
Quarterly and annual monitoring reports are due as described in Table 9.
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
14 Table 9. Quarterly and Annual Monitoring Reporting
Report Monitoring Period Report Due Date
First Quarter Monitoring
Report January 1 to March 31 May 1
Second Quarter Monitoring
Report April 1 to June 30 August 1
Third Quarter Monitoring
Report July 1 to September 30 November 1
Fourth Quarter Monitoring
Report October 1 to December 31 February 1
Annual Monitoring Report January 1 to December 31 March 1 Annual Pretreatment
Program Report January 1 to December 31 March 1
State Water Board
Volumetric Annual
Reporting
January 1 to December 31 April 30
1. Quarterly Monitoring Reporting – At a minimum, the quarterly reports must include:
i. Results of all required monitoring in tabular format. ii. The results of any pollutant or parameter monitored more frequently than is required by this monitoring program. Values obtained through additional monitoring must be used in calculations as appropriate. iii. A comparison of monitoring data to the discharge specifications, applicable effluent limitations, disclosure of any violations of the notice of applicability and/or General Permit, and an explanation of any violation of those requirements. The City of Santa Maria must calculate 7-day averages, 30- day averages and 25-month rolling medians for select analytes when comparing monitoring data to applicable effluent limitations specified in the General Permit. Data must be presented in tabular format. iv. Copies of laboratory analytical report(s) and chain of custody form(s). v. An updated hydrogeologic conceptual site model with the groundwater monitoring reporting requirements based on new information generated from the monitoring well boring logs, groundwater elevation data, and water quality data.
vi. Copies of groundwater monitoring well field sheets with purge methods and data.
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
15 2. Annual Monitoring Reporting – The City of Santa Maria must submit annual reports in compliance with Standard Provisions 20135, (and any updates to the Standard Provisions) Section C, General Reporting Requirements, Item 16 using the most recent annual report template provided by Central Coast Water Board.
The current annual report template can be found here:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf
3. Annual Pretreatment Program Report – Pursuant to California Code of Regulations, title 23, section 2233, subdivision (a), because the City of Santa Maria’s Wastewater System is designed to treat over five million gallons a day, the city must have and enforce an adequate pretreatment program approved by the Central Coast Water Board. The City of Santa Maria’s Pretreatment Program was approved by the Environmental Protection Agency (EPA) in 1982. The Pretreatment Program monitors compliance of permitted facilities and attempts to identify and reduce pollutants to both sanitary and stormwater collection systems.
On occasion, there may be a need to modify an existing pretreatment program, as identified by either the City of Santa Maria or the Central Coast Water Board.
These modifications may be driven by a variety of factors such as, but not limited to, a change in conditions at the Wastewater System, a recalculation of local limits (or reallocation of the maximum allowable industrial loading), changes to federal pretreatment regulations, or a change in the industrial user base discharging to the Wastewater System. Substantial modification is defined in title 40 Code of Federal Regulations (CFR) 403.18(b).
For substantial modifications, the City of Santa Maria must submit in writing to the Central Coast Water Board the rationale for the substantial modification, a detailed description of the proposed modification, and other documents considered necessary by Central Coast Water Board staff.
The City of Santa Maria must submit an annual Pretreatment Program report in accordance with title 40 CFR 403.12(i) that describes the City of Santa Maria’s pretreatment program activities, including activities of all participating agencies, if more than one jurisdiction is involved in the program. The report must include, at a minimum, the applicable required data in appendix A to 40 CFR part 127 which requires the following data to be added or updated annually:
i. Pretreatment program approval or modification date
5 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/docs/wdr_standard_provi sions_2013.pdf
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
16 ii. Pretreatment program modification type
iii. Industrial user type
iv. Significant industrial user subject to local limits v. Significant industrial user subject to local limits more stringent than categorical standards
vi. Significant industrial user wastewater flow rate
vii. Industrial user causing problems at the Wastewater System viii. Receiving resource conservation and recovery act (RCRA) waste ix. Receiving remediation waste
The report must also include a summary of changes to the City of Santa Maria’s pretreatment program that have not been previously reported to the Central Coast Water Board and any other relevant information requested by the Central Coast Water Board.
4. State Water Board Volumetric Annual Reporting – The City of Santa Maria must electronically certify and submit a summary of the monthly influent and effluent flow volume by April 30th of each calendar year via the State Water Board’s Internet GeoTracker database.6
The following information is required:
i. Monthly volume of wastewater collected and treated by the wastewater treatment plant (i.e., total monthly influent volume).
ii. Monthly volume of wastewater treated, specifying level of treatment, including treated wastewater discharged.
iii. If applicable, monthly volume of recycled water distributed, and annual volume of treated wastewater distributed for beneficial use in compliance with California Code of Regulations, title 22 use categories.
Additional information about volumetric annual reporting of wastewater and recycled water and the Recycled Water Policy is available at the Recycled Water Policy Volumetric Annual Reporting Website7.
6 See: https://geotracker.waterboards.ca.gov/
7 See: Volumetric Annual Reporting | California State Water Resources Control Board MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
17 B. NON-COMPLIANCE REPORTING:
The City of Santa Maria must notify and report to Central Coast Water Board noncompliance of limits related to pond freeboard, flow rate, bypass or overflow, and wastewater containment failure, pursuant to General Permit section VI.C.2.
C. ELECTRONIC GEOTRACKER SUBMITTAL
All monitoring reports must be provided electronically in a searchable PDF format, with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed.
https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater_permi tting/docs/transmittal_sheet.pdf
The City of Santa Maria must submit all reports/documents and laboratory analytical data to the State Water Board’s GeoTracker8,9 database consistent with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System-specific global identification number WDR100029526 at:
https://geotracker.waterboards.ca.gov/esi/login
For general questions, please contact the GeoTracker Help Desk at:
Table 10 summarizes all the GeoTracker electronic reporting requirements. Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.
Table 10. GeoTracker Electronic Submittal Information Data Requirements Electronic
Submittal Description of Action Action Frequency
8 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/docs/beginnerguide2.pdf 9 Additional information available at:
https://geotracker.waterboards.ca.gov/
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
18 Electronic
Submittal Description of Action Action Frequency
Reports and
Documents
Complete copy of all
documents including
monitoring reports (in
searchable PDF format) and
any other associated
documents related to the
Wastewater System.
Upload directly to
GeoTracker all
monitoring reports (in
searchable PDF
format) and any
other associated
documents.
On or before the due
dates required by this
General Permit and for
other documents when
required by the Central
Coast Water Board.
Laboratory
Data
All analytical data (including
geochemical data) in
electronic deliverable format
(EDF). This includes all
water, soil, and vapor
samples collected when
monitoring a discharge.
Upload, or direct
your California
ELAP-accredited
laboratory staff to
upload, all EDF
laboratory data
directly to
GeoTracker.
On or before the due
date of the required
monitoring report.
Depth to
Groundwater
Monitoring wells must have
the depth-to-water
information reported. Report
data only for wells defined as
permanent sampling points.
Upload depth-to-water information to
the GeoTracker
GEO_WELL file.
On or before the due
date of the required
monitoring report.
Boring Logs
and Well
Screen
Intervals
Boring logs must be prepared
by a registered professional
and submitted in PDF format
separately (not only as
attachments to reports).
Upload boring logs
(in searchable PDF
format) to
GeoTracker
GEO_BORE file
whenever a new
boring is drilled.
Every time a new
boring is drilled.
Field Points,
Location Data
(Geo XY)[1]
Name, classify, and identify
the location (latitude and
longitude) of all sampling
points. Monitoring wells must
be surveyed, influent and
effluent sample locations
must be identified on the
GeoTracker mapping tool
under “non-surveyed data.”
These data points are
required prior to laboratory
data uploads.
Upload the location
data (surveyed and
non-surveyed) to the
GeoTracker Geo_XY
file.
Every time a
permanent monitoring
point is established.
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
19 Electronic
Submittal Description of Action Action Frequency
Elevation
Data
(Geo Z)[2]
Survey and mark the
elevation at the top of
groundwater well casings for
all permanent groundwater
wells. These points are
required prior to depth-to-water data uploads.
Upload the survey
data to the
GeoTracker GEO_Z
file.
One-time, for all
groundwater
monitoring wells.
Geo Map
Site layout, map of facilities,
Wastewater System including
treatment and disposal
area(s).
Upload the Site
layout PDF to the
GeoTracker site plan
file.
Year one and every
five years thereafter
and when the facilities
are modified.
[1] Geo XY required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data. The City of Santa Maria must also upload sample locations (e.g., influent and effluent samples) that are not defined as a permanent monitoring well and have not been surveyed by a licensed professional.
[2] Geo Z required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data.
VII. TECHNICAL REPORTS
The technical reports are due as described in Table 11.
Table 11. Technical Report Submittal Due Dates
Report Report Due Date
Operations and Maintenance Manual June 16, 2024
Climate Change Adaptation Plan June 16, 2025
Salt and Nutrient Management Plan Not Applicable
Time Schedule Compliance Plan June 16, 2024
Groundwater Monitoring Plan[1] October 16, 2024
[1] Required if the City of Santa Maria chooses Option 2 described in section V.A.
1. Operations and Maintenance Manual – In addition to the required components specified in Standard Provisions10 A.12 and A.28 (and any updates to the 10 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/do-cs/wdr_standard_provisions_2013.pdf MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
20 Standard Provisions) and General Permit section VI.A.2, the Operations and Maintenance Manual must contain the following components. Each component must contain an implementation schedule and identification of adequate funding to implement the component.
i. Sampling and Analysis Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sampling and analysis plan that meets the requirements specified herein. Anyone performing sampling on behalf of the City of Santa Maria must be familiar with the sampling and analysis plan. At a minimum, the sampling and analysis plan must contain the following:
a. A wastewater treatment process flow schematic with the monitoring locations labeled and scaled Wastewater System maps with treatment components, discharge locations (both treated wastewater and non-potable recycled water), monitoring locations, groundwater wells, storage locations (e.g., chemical, sludge, emergency overflow ponds), and buildings. If the City of Santa Maria needs to update Figure 1 to comply with this requirement, a copy of the updated process flow schematic will also be included with the annual report. b. Sample identification details in tabular format. The table must include the sample titles, GeoTracker field point information, sample description(s), and sampling frequencies.
c. Sample chain-of-custody procedures and documentation. d. Sample handling/preservation procedures.
e. A description of the analytical methods.
f. A description of sample containers, preservatives, and holding times. g. For water supply monitoring, a description of the location and method of data collection (e.g., onsite well sampling, use of consumer confidence report).
h. For groundwater monitoring, a description of the well purging and field methods.
ii. Sludge Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sludge management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the plan must describe the following:
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
21 a. An estimated volume/amount and quality of sludge and scum that will be generated.
b. How sludge, scum, and supernatant will be stored and disposed of to protect groundwater quality.
c. If sludge will be subject to further treatment, describe the treatment and storage requirements.
d. Procedures for cleaning of digesters or storage vessels and the treatment and disposal of the residuals. If drying of residuals is planned, describe how that will be performed to prevent nuisance odors, prevent vectors, and protect groundwater quality. iii. Wastewater Disposal Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a wastewater disposal management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the wastewater disposal management plan must include:
a. A description of the wastewater disposal area and a map denoting acreage.
b. Loading calculations based on flow volumes, applied acreage, and biochemical oxygen demand, salts (total dissolved solids, sodium, chloride, sulfate, boron), and nitrogen analytical results. c. A description of wastewater disposal and water quality protection practices.
iv. Spill Prevention and Emergency Response Plan –The City of Santa Maria’s Operation and Maintenance Manual must contain a spill prevention and emergency response plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. The spill prevention and emergency response plan must describe operation and maintenance activities to prevent accidental releases of wastewater and to effectively respond to such releases and minimize the environmental impact. At a minimum, the spill prevention and emergency response plan must address the following:
a. Operation and Control of Wastewater System - A description of the wastewater treatment equipment, operational controls, flow measurement and calibration procedures, and treatment system schematic including valve/gate locations.
b. Sludge Handling - A description of the sludge handling equipment, operational controls, and disposal procedures.
c. Collection System Maintenance - A description of collection system cleaning and maintenance, equipment tests, and alarm functionality tests to minimize the potential for wastewater spills originating in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
22 collection system or headworks. For collection systems subject to State Water Board Order WQ 2022-0103-DWQ, Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (or its replacement), reports prepared to comply with State Water Board Order WQ 2022-0103-DWQ satisfy this requirement.
d. Emergency Response - A description of emergency response procedures including for emergencies such as power outage, severe weather, flooding, or inadequate freeboard (for systems with wastewater treatment, storage, or disposal ponds or treated non-potable recycled water storage ponds). An equipment and telephone list for contractors/consultants, emergency personnel, and equipment vendors.
e. Finance - At a minimum, discuss current fees, projected fees, current budget for spill prevention and emergency response, projected budget for spill prevention and emergency response.
f. Notification Procedures - Coordination procedures with fire, police, Governor’s Office of Emergency Services (CalOES), Central Coast Water Board, and local county health department personnel. v. Training Records Log – The City of Santa Maria’s Operation and Maintenance Manual must contain updated training records logs that demonstrate the City of Santa Maria is complying with General Permit section VI.B.3.
2. Climate Change Adaptation –The Climate Change Adaptation Plan must, at a minimum, include the following components:
i. Hazards and Vulnerabilities – Identify climate change hazards, at a minimum accounting for the hazards listed below, applicable to the Wastewater System. Using up-to-date tools, data, and guidance from the State of California (e.g., Cal-Adapt11, Sea-Level Rise Guidance from Ocean Protection Council, reports from the Climate-Safe Infrastructure 11 Cal-Adapt is an online resource with downscaled climate project data. It provides users with projections and more detailed downloadable data supporting a range of needs and array of climate models and emissions scenarios. Cal-Adapt offers climate projections for the major stressors facing California, including the following: temperature averages and extremes, precipitation averages and extremes, sea-level rise, wildfires, and drought. The Governor’s Office of Planning and Research (OPR) recommends agencies use Representative Concentration Pathway (RCP) 8.5 for analyses considering impacts through 2050, because there are minimal differences between emissions scenarios during the first half of the 21st century.
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
23 Working Group, the Climate Adaptation Planning Guide, and California Climate Assessment Regional Reports), assess the Wastewater System’s vulnerability to identified hazards that could cause reduction, loss, or failure of treatment processes and/or critical structures at the Wastewater System. Identify and justify the resources (e.g., models and tools, design parameters) used to inform identification of these hazards and vulnerabilities.
a. Sea Level Rise – Saltwater intrusion, flooding and inundation, and increased coastal erosion.
b. Precipitation Pattern Changes.
I. Drought – Decreased influent quantity and quality.
II. Peak Events – Flooding and increased influent quantity. c. Temperature fluctuations and extremes.
d. Increased wildfires.
e. Increased power outages.
ii. Resiliency Actions – Identify actions to build Wastewater System and operational resilience to identified vulnerabilities, accounting for options that minimize resource impacts.
iii. Adaptation Strategy – For Wastewater Systems with design flows over 1,000,000 gallons per day, develop and implement a strategy to complete resiliency actions, at a minimum encompassing the following:
a. Prioritization – Prioritized resiliency actions based on risks to water quality, but also accounting for costs and benefits.
b. Schedule and Milestones – Timeframes to complete prioritized resiliency actions and/or climate change hazard triggers to inform when the City of Santa Maria must implement actions. Milestones to complete critical steps for prioritized resiliency actions, designed to demonstrate measurable progress at a steady, or accelerated, completion pace over the established timeframes.
c. Financial Planning – Projected costs necessary to implement and sustain resiliency actions and strategy to procure funds. iv. Recycled Water Feasibility Plan – Dischargers with Wastewater System design flows over 1,000,000 gallons per day must include a recycled water feasibility plan.
The recycled water feasibility plan will assess the viability of using the Wastewater System’s treated wastewater effluent for beneficial reuse including, but not limited to the following:
a. Beneficial Reuse Options – Identification of reuse opportunities for the City of Santa Maria’s treated effluent that would achieve the highest beneficial impact and best uses possible of non-potable recycled MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
24 water. Include assessment of the following non-potable recycled water benefits identified in the State Water Board Recycled Water Policy:
providing safe alternatives to fresh water or potable water for approved uses; supporting sustainable groundwater and surface water uses with the intent of substituting use of treated effluent for use of fresh water or potable water; and diversifying community water supplies and mitigating for the impacts of climate change.12
b. Viable Users – Identification and viability evaluation of all potential users of the Wastewater System’s treated effluent associated with identified beneficial reuse options. The City of Santa Maria must demonstrate it engaged potential water purveyors and customers about the viability of reusing the Wastewater System’s treated effluent. c. Infrastructure Upgrades – Assessment of infrastructure needs to produce non-potable recycled water for identified beneficial reuses and convey non-potable recycled water to beneficial reuse locations. d. Fiscal Analysis – Cost estimates for identified reuse options, at a minimum including project development, construction, and long-term maintenance and lifecycle costs. This analysis shall also include identification and evaluation of the following: 1) funding options, including at a minimum, revenues from recycled water sales, grant and loan funding opportunities, and financing from other benefitting parties and 2) funding limitations.
e. Schedule and Milestones for Next Steps – Timeframes to assess the feasibility of identified beneficial reuse options and to identify proposed beneficial reuse options based on prioritized water recycling and reuse opportunities, feasibility assessments, and other factors identified by the City of Santa Maria.
f. Identification of implementation schedule and adequate funding to implement the plan.
3. Salt and Nutrient Management Plan – The City of Santa Maria is an active cooperating partner of the Santa Barbara County Integrated Regional Water Management (IRWM) Plan’s regional water management group. The regional water management group prepared and submitted an assessment of the Santa Maria Valley Groundwater basin to the Central Coast Water Board. The assessment concluded that the dischargers participating in the workgroup were in balance for salts and nutrients in 2013. A salt and nutrient management plan is 12 Water Quality Control Policy for Recycled Water, State Water Board, adopted December 11, 2018, page 1.
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
25 currently not required while the City of Santa Maria participates in the Santa Barbara County IRWM regional water management group.
4. Time Schedule Compliance Plan - As set forth in General Permit sections V.A and VI.A.5, if the City of Santa Maria anticipates that additional time is needed to achieve compliance with the effluent limitations, the City of Santa Maria must prepare and submit for Central Coast Water Board review and approval, a time schedule compliance plan. At a minimum, the time schedule compliance plan must address the following:
i. Comparison of the current effluent quality to the effluent and groundwater limitations in General Permit Tables 3-6.
ii. Identification of the City of Santa Maria’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).
iii. A detailed description and chronology of efforts, since issuance of the notice of applicability, to reduce wastes.
iv. Justification of the need for additional time to achieve the effluent limitations in General Permit Tables 3-6.
v. A detailed time schedule of specific actions the City of Santa Maria will take to achieve the effluent limitations.
vi. A demonstration that the time schedule requested is as short as possible, considering the technological, operation, and economic factors that affect the design, development, and implementation of the measures that are necessary to comply with the effluent limitation(s).
vii. If the requested time schedule exceeds one year, the proposed schedule shall include interim requirements and the date(s) for their achievement. The interim requirements shall include both of the following:
a. Effluent limitation(s) for the pollutant(s) of concern. b. Actions, measurable milestones, and tangible products leading to compliance with the effluent limitation(s).
VIII. LEGAL REQUIREMENTS
The Central Coast Water Board’s requirements that the City of Santa Maria submit the technical and monitoring reports described in this monitoring and reporting program are made pursuant to section 13267 of the California Water Code. Failure to submit reports in accordance with schedules established by this General Permit and notice of applicability with attachments or failure to submit a report of sufficient technical quality to be acceptable to the Central Coast Water Board may subject the City of Santa Maria to enforcement action pursuant to section 13268 of the California Water Code. Pursuant to section 13268 of the Water Code, a violation of a request made pursuant to section MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
26 13267 may subject the City of Santa Maria to civil liability assessment of up to $1,000 per day in which the violation occurs.
The Central Coast Water Board needs the required information to ensure compliance with the notice of applicability and the General Permit. The City of Santa Maria is required to submit this information because it is subject to the General Permit and is responsible for the discharge.
The burden, including costs, of the reports bears a reasonable relationship to their need and the benefits to be obtained. The requirement for the reports is necessary to ensure compliance with the General Permit, notice of applicability, and monitoring and reporting program to protect water quality.
The City of Santa Maria must implement the above monitoring program on October 1, 2023. The Central Coast Water Board may rescind or modify this monitoring and reporting program at any time.
Ordered By:
for Matthew T. Keeling
Executive Officer
\\ca.epa.local\RB\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\Order 2020-0020\final\Santa Maria_MRP_ R3-2023-0032_final.docx Jennifer Epp Digitally signed by Jennifer Epp
Date: 2023.06.15 16:19:04
-07'00'
PROJECT MEMORANDUM
REVISED FINAL
ATTACHMENT B DRAFT FINAL OF VOLUME 7, CHAPTER 2
OF MASTER PLAN - EFFLUENT DISPOSAL
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 7/Ch02.docx Contents
CHAPTER 2 EFFLUENT DISPOSAL 2-1
2.1 Introduction 2-1
2.1.1 Overview 2-1
2.1.2 Evaluation of Percolation Pond Performance 2-2
2.1.3 Pond Operations 2-4
2.2 Pond Area Estimates 2-5
2.2.1 Historical Percolation Pond Area 2-5
2.2.2 Updated Pond Area Survey 2-6
2.3 Pond Soils Assessment 2-7
2.3.1 Soils and Hydrogeological Investigation 2-7
2.4 Water Balance and Pond Capacity 2-8
2.4.1 Methodology 2-8
2.4.2 Pond Area Assessment 2-9
2.4.3 Water Balance Analysis 2-12
2.4.4 Maximum Pond Capacity Analysis 2-12
2.4.5 Results 2-15
2.4.6 Pond Percolation Capacity 2-18
2.5 Pond Rehabilitation and Cost 2-19
2.5.1 Need for Additional Percolation Pond Capacity 2-19
2.6 Conclusions/Recommendations 2-20
Appendices
APPENDIX B CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
APPENDIX C YEH AND ASSOCIATES GEOTECHNICAL DATA REPORT
APPENDIX D GSI WATER SOLUTIONS PERCOLATION POND PERFORMANCE EVALUATION
APPENDIX E SUMMARY OF PRIOR POND REHABILITATION WORK AND COST ESTIMATES FOR SOIL
CLEANING
Tables
Table 2.1 Average Effluent Discharge - July 2023 to December 2024 2-1 Table 2.2 Percolation Pond Construction and Performance 2-3 Table 2.3 Percolation Pond Areas 2-5
Table 2.4 Summary of Parameters Used to Obtain a Water Balance 2-8 Table 2.5 Percolation Pond Estimation Descriptions 2-9
Table 2.6 Pond 15 Topographic Survey Results - Area Estimation 2-10 Table 2.7 Calculated Percolation Pond Average Surface Areas 2-11 Table 2.8 Summary of Method Used to Determine the Water Balance 2-12 Table 2.9 Percolation Pond Maximum Depths 2-12
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES ii
Table 2.10 Correction Factors For Calibrating New and Old Pond Depth Measurements 2-13 Table 2.11 Percolation Pond Rehabilitation and Estimated Cost 2-19 Figures
Figure 2.1 Aerial View of Existing WWTP and Percolation Ponds (2023) 2-2 Figure 2.2 Visual Comparison of Percolation Pond Performance in 2023 2-4 Figure 2.3 Topographic Survey Data for Percolation Ponds (2025) 2-6 Figure 2.4 Schematic of Pond Water Balance Calculation 2-9 Figure 2.5 Topographic Analysis of Pond 15 - Total Pond Overview 2-10 Figure 2.6 Topographic Analysis of Pond 15 - Zoomed-in View of Contours 2-11 Figure 2.7 Topographic and Aerial of Pond 4 2-14
Figure 2.8 Daily Influent Flow to the WWTP and 30-Day Rolling Average 2-15 Figure 2.9 Total Working Volume in All Ponds 2-17
Figure 2.10 Calculated Monthly Average Volume Percolated 2-18 Figure 2.11 Preliminary Layout for the Proposed New Percolation Ponds 2-20 VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-1
CHAPTER 2 EFFLUENT DISPOSAL
2.1 Introduction
This chapter describes the effluent disposal approach using percolation ponds at the Santa Maria Wastewater Treatment Plant (WWTP), including geotechnical considerations, the current operational challenges, a summary of the regulatory requirements for future effluent disposal, and the method used to develop a water balance for the WWTP effluent. As part of the long-term master planning effort, understanding the present condition and capacities of the existing ponds will be valuable for decisions regarding future pond capacity needs.
The City of Santa Maria (City) is permitted under the City's General Waste Discharge Requirements Order (No. R3-2020-0020). The order states under Table 2 of Attachment 1 of the original Notice of Applicability (NOA) that: "The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd. Table 2 lists the Wastewater Disposal Method as Percolation Ponds, 123 acres, and lists Disposal Capacity (mgd) as 8.0" As a result of that Order, a Time Schedule Compliance Plan (TSCP) was developed to bring the WWTP into compliance to meet stated effluent discharge quality limits. See Volume 2, Chapter 4 for details. The TSCP identifies several milestones and tasks to be completed by the City. One such task, Task 3, relates to the ponds. Task 3 states, "The City will conduct a study to investigate percolation pond water balance, geology/hydrogeology, and capacity. Recommendations for improvements will be developed." This chapter summarizes the development of the water balance, the operational challenges with the existing percolation ponds, and proposed recommendations for improvements.
2.1.1 Overview
As mentioned in Chapter 1 of this volume, Santa Maria percolates all of its secondary effluent into 15 separate percolation ponds. In April 2024, the City submitted plans to the Central Coast Water Board (see Appendix B) to construct three additional small ponds (called A-1, A-2, and A-3), totaling about one acre in area, to provide some additional seasonal retention. These ponds came into service in July 2024.
Average effluent flow, total suspended solids (TSS), and 5-day biochemical oxygen demand test (BOD5) concentrations from July 2023 to December 2024 are summarized in Table 2.1. Note that regular monitoring of BOD5 began in October 2023.
Table 2.1 Average Effluent Discharge - July 2023 to December 2024 Parameter Unit Value
Flow mgd 6.88
TSS mg/L 37.7
CBOD(1) mg/L 51
BOD5
(2) mg/L 76.0
Notes:
CBOD - carbonaceous biochemical oxygen demand; mg/l - milligrams per liter (1) City historically measured CBOD rather than BOD5 for compliance, through September 2023.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-2
(2) BOD5 data measured weekly since October 2023.
The effluent is conveyed via gravity flow to 15 large percolation ponds located to the west of the WWTP, and also to the three new small ponds located to the east of the WWTP adjacent to Black Road. The percolation ponds located west of the WWTP are illustrated in Figure 2.1.
Figure 2.1 Aerial View of Existing WWTP and Percolation Ponds (2023)
2.1.2 Evaluation of Percolation Pond Performance
Various assessments of the percolation pond performance have been conducted over the years. The most recent assessment was completed in 2023, and estimates of the percolation rates were made based on level monitoring data provided by the City. A comparison of individual pond percolation rates provides an initial assessment of relative pond performance. Note that this evaluation was completed prior to the addition of the three small ponds, A-1, A-2 and A-3, mentioned earlier. Table 2.2 summarizes the construction dates of the ponds and their estimated percolation rates in inches per day. As shown from the 2023 data, the best-performing ponds have percolation rates in the 5 to 8 inches per day range, while the poorest-performing ponds only percolate 2 to 3 inches per day. Comparing the 2023 data to the 2006 design percolation rates shows some significant differences. With one exception, the design percolation rates are all significantly greater than the measured rates. Information compiled in Table 2.2 may be found in the report by Yeh and Associates (Yeh) in Appendix C.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-3
Table 2.2 Percolation Pond Construction and Performance Pond
Number
Estimated Construction Range 2023 Estimated Percolation Rates(1) (inches/day)
2006 Estimated Design
Percolation Rates(2)
1 1960 - 1967 5-8 12
2 1978 - 1981 5-7 4
3 1960 - 1967 5-7 12
4 1978 - 1981 2-4 12
5 1960 - 1967 5-6 12
6 1978 - 1981 2-4 12
7 1960 - 1967 2-4 8.4
8 1978 - 1981 2-4 8.4
9(3) Not used
10(3) Not used
11 1994 - 2002 3-5 15
12 1994 - 2002 4-5 15
13 1994 - 2002 3-4 15
14 1994 - 2002 2-4 15
15 1994 - 2002 3-5 15
16(4) Not used
17(4) Not used
DKC 1994 - 2002 4-6 N/A
Wash 2009 - 2012 2-3 N/A
Notes:
N/A - not applicable
(1) Percolation rates provided in 2023 update discussed in Appendix C. (2) Design percolation rates from Task 4 of the 2006 City of Santa Maria Phase II WWTP Expansion. (3) Ponds 9 and 10 were decommissioned, and the land was transferred to Engel and Grey for composting operation. (4) Ponds 16 and 17 were not built or constructed onsite.
As indicated by the values in the table, there is a wide variation in percolation rates between the ponds, and the current estimated rates (2023 values) have declined significantly from the estimated percolation rates developed in 2006. The declining rates were confirmed in a 2024 assessment by GSI Water Solutions (GSI), which compared the percolation pond capacity visually, shown in Figure 2.2. A copy of GSI's report is included in Appendix D.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-4
Figure 2.2 Visual Comparison of Percolation Pond Performance in 2023
2.1.3 Pond Operations
The City cycles the percolation ponds in a series of fill, dry, and rest cycles. During a fill cycle, the effluent is directed to the active ponds. Once the desired pond water level has been achieved, the influent gate is closed, and the pond level is allowed to drop as percolation occurs. After a 10 to 14-day period of percolation, the remaining water in the pond is pumped to an adjacent operating pond, and the first pond is allowed to dry out. Once the pond is dry, there is a rest period of 7 to 10 days, and then the pond is either put back into service or equipment is brought in to rip the soil in the bottom of the pond, followed by re-grading to prepare it for the next cycle. Winter operations necessitate that ponds will undergo four or five operational cycles before they are fully dried out for ripping.
Treated secondary effluent gravity flows to the percolation ponds through a series of distribution boxes.
Each pond includes a small earthen sump area at a low point in the pond, from where the Operations staff can pump down the ponds completely, ahead of a dry or rest cycle. Each pond is fitted with a level sensor that transmits the operating water level. These level sensors were installed in 2024 adjacent to level measuring staffs that were historically used to estimate the pond water depth.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-5
2.2 Pond Area Estimates
2.2.1 Historical Percolation Pond Area
The overall pond area estimate noted in the initial NOA provided by the Central Coast Regional Water Quality Board is 123 acres. This information appears to be based on an analysis completed in 2006 for the expansion of WWTP completed in 2008, in which the percolation ponds were estimated to have the areas shown in Table 2.3, which totals 123.6 acres.
Table 2.3 Percolation Pond Areas
Pond Number Estimated Pond Area - 2006 Design(1)
(acres)
1 9.9
2 11.6
3 5.7
4 6.4
5 9.3
6 8.8
7 12.2
8 5.2
9(2) 8.4
10(2) 8.4
11 4.1
12 4.1
13 2.0
14 2.0
15 5.9
16(3) 8.6
17(3) 11.0
DKC(4) N/A
Wash(4) N/A
Total 123.6
Notes:
(1) Percolation areas provided in Task 4 of the 2006 City of Santa Maria Phase II WWTP Expansion. (2) Ponds 9 and 10 transferred to adjacent property owner (Engel and Grey) and decommissioned. (3) Ponds 16 and 17 were not constructed.
(4) No estimated pond areas for the DKC and Wash pond provided in the 2006 estimate.
However, since the 2006 study, two ponds (Ponds 9 and 10) were taken out of service and their land was used for other purposes, and two ponds (Ponds 16 and 17) were never constructed. The combined area of these four ponds is about 36 acres, which reduces the usable pond area to about 87.6 acres. This area excludes the areas of the DKC and Wash ponds, the areas of which were not noted in the 2006 analysis.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-6
2.2.2 Updated Pond Area Survey
Recently, the City carried out a series of aerial surveys of the existing ponds so that they could capture the topographical information of each pond when it was completely dry. These surveys were used to create a digital terrain model of the percolation pond area. From the digital terrain model, accurate measurements of the current pond areas could be made. Figure 2.3 shows a topographical image of the percolation pond area obtained from the City's aerial survey data, which includes the three new smaller ponds mentioned earlier.
2.2.2.1 Area Estimation
In order to quantify the daily water volume capacity and pond accumulation, an average surface area for each pond was estimated. Each pond was built with compacted earthen berms and constructed with 3:1 side slopes (horizontal to vertical). Outlet boxes are installed within the pond to manage water levels, provide controlled overflow during storm events, and prevent overtopping. The ponds were designed with a minimum of 2 feet (ft) of freeboard.
The surface areas were estimated based on a topographic survey, which displays elevation contours within and around each individual percolation pond. The computer-aided design (CAD) software then provides estimates of the area encompassed by that elevation contour. An overview of the topographical survey information used for the analysis is shown in Figure 2.3. The three new ponds A-1, A-2, and A-3 are indicated on the eastern side of the facility in Figure 2.3.
Figure 2.3 Topographic Survey Data for Percolation Ponds (2025) VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-7
2.3 Pond Soils Assessment
Percolation rates are governed by the type of soils in the ponds. An assessment of current soil types within the ponds was carried out as part of the Master Planning effort by Yeh, assisted by GSI and the City.
2.3.1 Soils and Hydrogeological Investigation
There have been numerous hydrogeological investigations on the soil surrounding the WWTP to assess percolation pond performance. In general, City plant staff have reported that the existing percolation ponds perform at varying rates, and some improvements would be beneficial to the plant operations.
Yeh completed an evaluation of the soil and hydrogeological characteristics of the percolation ponds in 2024. They excavated 46 test pits, completed 30 cone penetration test (CPT) soundings, and completed thirteen 8-inch hollow stem auger exploratory borings to depths of 31 to 34.5 ft in order to evaluate the soils. The field work was focused on comparing the soils in ponds that have low percolation rates, such as Ponds 4, 6, and 14, and those that have higher percolation rates, such as Ponds 1, 2, and 3. The following summarizes the findings from the investigations; more details can be found in the report included in Appendix C:
Sieve analysis and hydrometer testing on 29 samples collected from the test pits and boring showed that ponds with the lowest observed percolation rates (Ponds 4, 6, and 14) had the lowest hydraulic conductivity values. On the other hand, ponds with the highest observed percolation rates (Ponds 1, 2, and 3) had soils with hydraulic conductivity values that were significantly higher. In the upper levels of each pond, there is an organic scum layer (about 0.25 inches thick) that accumulates after the fill-dry cycle. This scum layer alters the composition of the soil into a finer consistency (typically poorly graded sand to silty clay) and may impact percolation pond performance. Discontinuous silt and clay layers exist at lower depths across the percolation ponds, which may impact percolation pond performance.
The sand layers in the percolation ponds were observed to be of a dark black color. This is likely a result of TSS and organic accumulation, nitrogen consumption, and chemical interactions with the soil and effluent.
Desiccation of the soil layers has been observed in the soil, which suggests a higher concentration of clay and silt layers.
Based on these observations and the details presented in Appendix C, Yeh provided the following preliminary recommendations:
Update the operational procedures to include removal of the upper 2 to 4 inches of soil during the drying and rest periods.
Perform deep ripping of the bottom of the ponds each time a pond has dried. Plan for the phased removal of clayey and silty soil present within the upper 5 to 10 ft of the ponds over time. In 2012, the upper 5 ft of soil within Ponds 1, 2, 3, and 5 was processed by a sand/clay separator, referred to as "The Beast". After processing, the clay soil was removed, and the cleaned sandy soil was placed back into the ponds. This had a significant impact on the percolation rates, and as shown earlier in Table 2.2, Ponds 1, 2, 3, and 5 are still the best-performing ponds. A similar VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-8
operation is recommended for all ponds, starting with the ponds that have the lowest percolation rates.
If possible, reduce the TSS of effluent discharged to the ponds to avoid continued accumulation of fine material on the bottom of the ponds.
Transfer remaining pooled water left in ponds at the end of a cycle to a separate settling pond or to the plant headworks instead of to an adjacent percolation pond. In other words, avoid transferring fine material from pond to pond.
Consider evaluating dry wells, air blasting, or injection wells as supplemental measures.
The proposed rehabilitation measures and associated costs are discussed in Section 2.5.
2.4 Water Balance and Pond Capacity
In order to establish an accurate overall capacity of the percolation pond system, a water balance was performed. Simply adding up the observed percolation rates of each pond does not provide the true capacity of the system because not all ponds are operational all the time. As indicated earlier, ponds are rotated in and out of service on a regular basis. However, a water balance can show the overall storage capacity of the system on a daily basis, which provides an indication of how much additional water the system can handle.
2.4.1 Methodology
To achieve the water balance, it was important to quantify the inflow, outflow, evaporation, and percolation of water from the percolation ponds. The methodologies utilized to estimate these parameters are summarized in Table 2.4.
Table 2.4 Summary of Parameters Used to Obtain a Water Balance Parameter Methodology
Pond Inflow Plant influent flow data obtained from the City. Monitored and reported in mgd.
Daily plant influent flow is a good measure of the daily plant effluent flows to the percolation ponds.
Evaporation A Class A evaporation pan equipped with a data logger was installed in the pond area to capture evaporation data.
Precipitation Rainfall measurements were made on site. These were found to match the California Irrigation Management Information System Data Station 232 - Santa Maria Airport fairly closely. So, for the purpose of the water balance, the Station 232 data was used.
Other Water Losses A certain amount of water is retained in the biosolids hauled from the plant each day for disposal. For the purposes of this water balance, these water losses were assumed to be approximately equal to the City water that is used as process water in the plant.
Pond Water Depth The depth of water in each pond was measured using the measuring staff, and later the level sensors installed in each percolation pond sump.
Pond Areas The average working area of each pond was calculated from topographic survey data obtained by the City (discussed in more detail below).
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-9
For more information regarding the development of these input parameters, refer to the report by GSI in Appendix D.
A water balance was generated over the 18-month period of July 2023 to December 2024. The balance was developed using basic mass balance principles, where the mass entering a system must equal the mass leaving a system, assuming no accumulation, as illustrated in Figure 2.4.
Figure 2.4 Schematic of Pond Water Balance Calculation
2.4.2 Pond Area Assessment
In order to establish the daily volume of water in each pond, the average pond area was multiplied by the pond water depth on that day. To determine the average pond area, the topographical data was used to first determine the Top of Berm elevation for each pond. The Civil 3D software allows the surface area at this elevation to be calculated. Based on this elevation, the Top of Water elevation was then established, two ft below the Top of Berm elevation. The Bottom of Berm elevation was established based on the elevation at which the 3:1 slope of the pond berm ends. Finally, the bottom elevation of the pond was estimated from the shape of the bottom of the pond and the number of contour lines available. Each of the different elevations obtained from the topographic data is described in Table 2.5.
Table 2.5 Percolation Pond Estimation Descriptions
Designation Method
Top of Berm Elevation and contour area associated with the top of the compacted earthen berms surrounding each pond.
Top Water Level Elevations and contour area associated with the top design water level of each pond to provide two ft of freeboard to the Top of Berm elevation.
Bottom of Berm Elevation and contour area associated with the hinge point at the bottom of the 3:1 sloped berm.
Bottom of Pond Average elevation and contour area of the bottom of the pond, accounting for the downward slopes of the pond bottom towards the outlet box.
The surface area estimation for each pond was calculated by taking the average area associated with the "Top Water Level" elevation contour and the "Bottom of Berm" elevation contour. The difference in VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-10
elevation between the Bottom of Berm elevation and the Bottom of Pond elevation was used to adjust the working depth of each pond.
Using Pond 15 as an example, the elevation at the top of the berm is 147 ft. The area contour associated with that elevation is 7.11 acres. The Top Water Level contour would be 145 ft with an associated area of
6.63 acres. Similarly, the other elevations and areas for Pond 15 were obtained from the topographic survey data and are summarized in Table 2.6. The table shows that there is an elevation difference between the Bottom of Pond and the Bottom of Berm. In an ideal world with a perfectly flat bottom on the pond, the Bottom of Pond and Bottom of Berm would be the same. However, operationally, it is difficult to obtain a perfectly flat pond bottom, and a totally flat bottom would not be desired as it is important to have some slope remaining on the bottom of the pond to allow for drainage when the pond is taken out of service. As shown in Table 2.6, for Pond 15, the elevation of the bottom of the pond was estimated to be one foot below the Bottom of Berm level, which adds an extra foot of capacity. This is an estimate based on the actual shape of the contours, unique to each pond.
Table 2.6 Pond 15 Topographic Survey Results - Area Estimation Designation Elevation Area (acres) Working Depth (ft)
Top of Berm 147 ft 7.11
Top Water Level 145 ft 6.63 11(1)
Bottom of Berm 134 ft 4.95
Bottom of Pond 133 ft 3.14 1
Average 139.5 ft(3) (6.63 - 4.95) = 5.79(2) 12(4)
Notes:
(1) The difference between the Top Water Level and the Bottom of Berm provides the "ideal" operating depth. (2) Average Surface area taken to be the average of the "Top Water Level" and "Bottom of Berm" areas. For mass balance, this assumes that the bottom of the pond is flat.
(3) Elevation corresponding to the average pond area (134 + (145-134)/2). (4) Working depth based on "ideal" depth plus correction amount based on actual contours of the pond bottom.
This approach is depicted in Figures 2.5 and 2.6. The red lines on the exterior of the pond represent "Top Water Level", that is 2 ft below the Top of Berm, and the "Bottom of Berm" elevation. The green line represents the average of the two. The green line is taken to be the "average area" used to calculate the daily pond depth.
The purple line is representative of the "bottom of pond" elevation, which in this case adds an additional one foot of water depth, used for calculating the maximum capacity of the pond, bringing the total depth to 12 ft.
Figure 2.5 Topographic Analysis of Pond 15 - Total Pond Overview VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-11
Figure 2.6 Topographic Analysis of Pond 15 - Zoomed-in View of Contours Using this method, the average surface areas for each pond were developed from the latest topographical data. These areas are shown in Table 2.7. Note that the average surface areas are based on the average of the "Top Water Level" and the "Bottom of the Berm" topographic contours. This approach assumes an idealized flat surface for the bottom of the pond, which is not always the case. As shown in the table, this method results in an average total pond area, based on top and bottom areas, of 80.4 acres.
Table 2.7 Calculated Percolation Pond Average Surface Areas Pond Number Area (Acres)
1 6.6
2 7.7
3 3.1
4 4.6
5 6.4
6 6.9
7 1.6
8 3.0
11 6.1
12 6.3
13 6.7
14 7.1
15 5.8
DKC 6.2
WASH 1.3
A-1(1) 0.5
A-2(1) 0.1
A-3(1) 0.34
Total 80.4
Notes:
(1) Average areas of ponds A-1, A-2, and A-3 were provided by the City. These areas ended up being slightly less than anticipated by the City (see Appendix B for initial area estimates).
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-12
2.4.3 Water Balance Analysis
Over the July 2023 to December 2024 period, the City provided daily logs of the depth of water in each pond. An example of the provided pond water depths can be found in Appendix D.
Using the previously calculated average surface areas from Table 2.7 and the recorded daily pond water depths, the active volume of each pond can be calculated on a daily basis. Using the daily record of individual pond volumes, the daily total volume of water in the percolation pond system could also be determined, and by taking the pond volume observed over one day and subtracting it from the previous day the change in total pond volume, or the percolated volume plus evaporative loss minus rainfall accumulation, could be calculated. Table 2.8 shows the approach used to determine the water balance.
Table 2.8 Summary of Method Used to Determine the Water Balance Term Equation Used
Pond Volume = 𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅 𝑝𝑝 𝑝𝑝 𝑤𝑤𝑤𝑤𝑤𝑤 ℎ (𝑓𝑓 ) ∗ 𝐸𝐸𝐸𝐸 𝐸𝐸𝐸𝐸 𝑝𝑝 𝑝𝑝 (𝑓𝑓 2) Daily Accumulation = (𝑃𝑃 𝑉𝑉 𝑉𝑉𝑉𝑉 , ) − (𝑃𝑃 𝑉𝑉 𝑉𝑉𝑉𝑉 , − 1) Percolation = 𝐹𝐹 𝑃𝑃 ,𝑄𝑄 + 𝑃𝑃 − 𝐸𝐸𝐸𝐸 𝐸𝐸 − 𝐴𝐴
Based on the GSI report in Appendix D, the average precipitation observed over the time period was
0.22 mgd, and the average evaporation was 0.18 mgd. Accordingly, the average addition to the pond system was set at +0.04 mgd to account for this effect.
2.4.4 Maximum Pond Capacity Analysis
To determine the maximum working volume of the percolation ponds, the maximum working depth is needed. This depth is the difference in elevation between the "Bottom of the Pond" and the "Top Water Level." As mentioned above, the "Bottom of the Pond" elevation is below the "Bottom of Berm" elevation and accounts for the ground sloping towards the discharge sump, and was typically taken as the midpoint of the slope along the bottom of the pond. For some ponds, however, (Ponds 1, 2, 3, 5, 7, 8, and DKC), the elevation change was not significant, and therefore the "Bottom of the Pond" elevation was taken as being equal to the "Bottom of the Berm" elevation.
Accordingly, the maximum water depths utilized for calculating the maximum volume of the pond system are shown in Table 2.9. The depths of new ponds A-1, A-2 and A-3 were typically around 4.5 feet.
Table 2.9 Percolation Pond Maximum Depths
Pond Number Top Water Level Elevation Bottom of Pond Elevation Maximum Depth (ft)(1) 1(2) 154 140 14
2(2) 153 139 14
3(2) 153 138 15
4(3) 153 144 9
5(2) 153 137 16
6(3) 152 144.5 7.5
7(2) 153 140 13
8(2) 152 145 7
11(3) 146 140 6
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-13
Pond Number Top Water Level Elevation Bottom of Pond Elevation Maximum Depth (ft)(1) 12(3) 146 136 10
13(3) 144 135 9
14(3) 145 134.5 10.5
15(3) 145 133 12
DKC(2) 152 142 10
WASH(3) 153 140.5 12.5
Notes:
(1) Maximum depth is the value utilized for calculating the maximum volume of the pond, using the average surface areas developed in Table 2.7.
(2) Ponds with a relatively flat ground surface, where the "Bottom of the Berm" elevation is taken as the low point. (3) Ponds with a sloping ground surface, where the "Bottom of the Pond" elevation is taken as the low point.
Subsequently, using the maximum depths found in Table 2.9 and the average areas found in Table 2.7, the maximum volume of all the ponds can be determined.
2.4.4.1 Probe Calibrations
In 2024, the City replaced the manual staff gauges in the 15 large ponds and added pressure sensors.
As part of the replacement, it was observed that there was a discrepancy between the readings of the new and the old gauges. As such, the City recorded the discrepancies and the date of the replacement.
Because the new electronic level sensors are considered to be more accurate, a series of correction factors was used to update all previous gauge readings to the new electronic sensors. The correction factors were retroactively applied to all the pond height readings utilized in this analysis.
A list of the correction factors and the date of replacement is shown in Table 2.10. The correction factors were applied to all data prior to the date on which the gauge was replaced, so that all readings are consistent.
Table 2.10 Correction Factors For Calibrating New and Old Pond Depth Measurements Pond Number Date Calibrated Difference to be Applied to New Measuring Sensor (inches)
1 October 29, 2024 27
2 November 6, 2024 18
3 December 5, 2024 8
4 October 4, 2024 15
5 November 27, 2024 -5
6 October 17, 2024 -6
7 October 24, 2024 20
8 October 19, 2024 18
11 October 15, 2024 9
12 October 4, 2024 3
13 October 22, 2024 0
14 November 8, 2024 7
15 November 21, 2024 3
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-14
Pond Number Date Calibrated Difference to be Applied to New Measuring Sensor (inches)
DKC October 19, 2024 23
WASH October 29, 2024 3
2.4.4.2 Maximum Volume Capacity Analysis
As mentioned above, the assumption to use "Bottom of the Pond" contours more accurately captures the usable volume of the pond, rather than using the "Bottom of Berm" elevation to represent the lowest pond level. As shown in Figure 2.7, the topographic contours illustrate a declining ground slope towards the outlet box in Pond 4. This ground slope is significant in several of the ponds. Therefore, when estimating the total volume of the ponds, the increased depths need to be captured in the estimate.
If the "Bottom of the Berm" elevation was utilized in Pond 4 instead of the "Bottom of the Pond" elevation, approximately 4 ft of depth would not be included in the maximum volume. That has a significant impact on overall capacity of the pond. As a result, the maximum volume capacity for Ponds 4, 6, 11, 12, 13, 14, 15, and wash pond was based on "Bottom of Pond" elevations. The maximum volume capacity for the other ponds was based on "Bottom of Berm" elevations due to the minimal observed ground slope. This provides a more reasonable estimate of actual pond capacity.
Figure 2.7 Topographic and Aerial of Pond 4
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-15
2.4.5 Results
2.4.5.1 Mass Balance Analysis
The daily influent flow to the plant is plotted in Figure 2.8 for the period of July 2023 to December 2024.
The yellow continuous line in Figure 2.8 is the 30-day moving average. As noted earlier, the influent flow to the plant is a good measure of the treated effluent flow to the percolation ponds. Unaccounted for flow includes the water that is lost from the system with treated solids, and water that is added to the system through the use of City water for washing down and pump seal water. Both of these flows are small compared to the influent flow and, as noted, are assumed to offset each other.
Figure 2.8 Daily Influent Flow to the WWTP and 30-Day Rolling Average Initially, for the first 60 days (July and August 2023), the recorded daily influent flow was around 8.5 mgd, and there were several days when the flow was above 9 mgd, both greater than the permitted flow.
However, after recalibration of the influent flow meter early in September 2023, the influent flow dropped to around 7 mgd. And the flow has remained more or less stable since then, with the 30-day rolling average between about 6 and 7 mgd. However, as the data shows, even after the flowmeter recalibration, there are individual days when the influent flow is well above 8.0 mgd.
Over the entire time period, the average flow to the ponds was 6.88 mgd. When including the net precipitation and evaporation, the average flow is equal to 6.92 mgd.
Using the observed pond water depth and the average pond area, the working volume of each individual pond was calculated. The individual pond volumes were summed to provide a daily variation of the total volume of water within the ponds. This is shown in Figure 2.9 for the entire 18-month period.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-16
As shown, the total volume of water in the ponds varied between about 413 acre feet (AF) in July 2023 to a peak of about 680 AF in January/February 2024, during one of the wettest winters on record. As noted on Figure 2.9, the total pond capacity, excluding the 2 ft of freeboard, is about 870 AF.
The daily variation in total pond volume results from either an accumulation of water (through rainfall, poor percolation, increased effluent flow) or a loss of water (through evaporation, percolation, decreased effluent flow), as presented earlier in Figure 2.4. By accounting for the rainfall, evaporation, effluent flow, and daily change in total pond volume, the average volume of water lost through percolation can be determined. The average percolation on a monthly basis is illustrated in Figure 2.10. As indicated, the percolation rate varies throughout the period, with high values of 8.8 mgd and 8.4 mgd achieved in July/August 2023 and August 2024, respectively. This is understandable because not all ponds are in service continuously. As mentioned earlier, ponds are rotated into and out of service to allow time for resting, followed by ripping and grading. In addition, as presented earlier, not all ponds have the same individual percolation rates, so a combination of ponds that includes the majority of "poor performers" will result in a lower overall percolation rate. Overall, over the 18-month period under review, the percolation ponds percolated an average of 6.84 mgd (blue column in Figure 2.10), roughly in line with the influent flow. This confirms that over the entire period, there was no net increase in the volume of water held in the ponds.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-17
Figure 2.9 Total Working Volume in All Ponds
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-18
Figure 2.10 Calculated Monthly Average Volume Percolated
2.4.5.2 Remaining Pond Capacity
The maximum pond capacity was determined to be 870 AF, excluding the 2 ft of freeboard, as noted.
From the daily volume variation data presented in Figure 2.9, the maximum observed volume reached was 677 AF, or about 78 percent of the maximum capacity. This means that 22 percent of the pond capacity was still available, indicating that the ponds have capacity to dispose of additional flow.
2.4.6 Pond Percolation Capacity
As listed in the permit, the percolation disposal capacity is noted as a daily capacity and limited to
8.0 mgd. Clearly, from the daily plant influent data presented in Figure 2.8, the pond system has been receiving flow that exceeds 8.0 mgd at times, even after the calibration of the influent flow meter. The City has had to report such violations based on the daily permitted flow, although the above analysis has shown that the pond capacity easily exceeds a daily average of 8.0 mgd. Therefore, to avoid such permit violations, a request should be made to the Water Board to adjust the permit.
The maximum volume that the ponds have held over the 18-month period under review, which included one of the wettest winter seasons on record, was 78 percent. This suggests that the ponds could take on more flow and not be at risk of reaching their maximum capacity. This is supported by the calculated average volume of water percolated by the ponds on a monthly basis. Figure 2.10 shows that the ponds can percolate well over 8 mgd on an average monthly basis, as well as a daily basis.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-19
Based on the data set available, we conclude that the pond capacity is greater than the listed value in the permit. The data shows that, with all ponds in service, the maximum monthly percolation volume is
9.2 mgd. Being conservative and allowing for the largest pond out-of-service (7.7 acres) to accommodate pond rotation/maintenance, gives a monthly average working capacity of 8.3 mgd. Accordingly, using the approach of the largest unit out-of-service, a more reasonable permitted capacity for the ponds should be a monthly average capacity of 8.3 mgd. Using a monthly average value rather than a daily average value will prevent unnecessary flow violations associated with daily peak flows that occur periodically.
2.5 Pond Rehabilitation and Cost
As discussed in Section 2.3, the 2024 soils investigations resulted in a number of recommendations for rehabilitation of the ponds to improve and sustain performance. Table 2.11 summarizes the recommended rehabilitation actions, the anticipated costs per pond, the number of ponds to be addressed each year, and the total amount to be included in the City's Operations and Maintenance (O&M) budget. Rather than capital projects, this rehabilitation work would be carried out as part of ongoing pond O&M to improve pond percolation rates in the short term and maintain such rates in the longer term. See Appendix E for details of the estimated cost per pond for removal, cleaning, and replacement of 5 ft of soil. It is anticipated that this work would be repeated every 10 to 15 years as pond percolation rates begin to decline.
Table 2.11 Percolation Pond Rehabilitation and Estimated Cost Rehabilitation Action Impacted Ponds Estimated Cost
per Pond
Ponds per
Year
O&M
Budget
Remove upper 2 to 4 inches of soil All $6,500 5 $100,000 Perform deep ripping after drying All Included(1) 5 -
Removal of upper 5 ft of soil, clean and
replace(2)
All - Start with Ponds 4,
6, 7, 8, and 14
Varies based on
soil volume(3)
3 to 4 per year
in summer
$23,000,000
(4)
Reduce TSS of effluent discharged to ponds All Part of separate project(5)
N/A N/A
Transfer fines to separate settling pond(6) All Not yet established
N/A $150,000
Notes:
(1) Assumed to be included as part of the ongoing operations. (2) Repeat every 10 to 15 years or when percolation rates drop to 2 to 4 inches per day range. (3) See Appendix E for details.
(4) Amount is for cleaning all ponds once, and cleaning would take about 5 years to complete ($4.6 million per year). Budget amount would be required roughly every 10 to 15 years depending on rate of solids build-up. (5) The City may or may not implement an interim tertiary filter project. (6) Placeholder for implementing transfer of final pond drainage water to separate settling pond.
2.5.1 Need for Additional Percolation Pond Capacity
As noted in Section 2.4, the City continuously rotates the ponds into and out of service, but the out-of-service ponds only remain unused for a period of a few days. As a result, there is not sufficient excess capacity to allow the City to take one or more ponds out of service during the summer months for extended rehabilitation/maintenance work. As noted in Table 2.11 for the soil removal/cleaning/replacement operation, only about 3 to 4 ponds could be rehabilitated each year.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-20
This work would be done during the summer months when the ponds could be allowed to dry out completely, but this is also the time of year that the WWTP receives its highest flow rates.
In order to create flexibility to take one or more ponds out of service for an extended period for rehabilitation, the City has decided to construct additional percolation ponds. These ponds will be located on City-owned property on the east side of Black Road in an area that is currently used for agriculture.
Figure 2.11 shows a preliminary layout for the six new proposed ponds, each with an area of approximately 7 acres. The new percolation pond project is expected to get underway in the first half of 2026 and be completed by the end of 2029. Once the new ponds are in service, the most poorly performing existing ponds (Ponds 4, 6, 7, 8, and 14) can be scheduled for rehabilitation, and then the regularly scheduled rehabilitation of the remaining ponds can follow.
Figure 2.11 Preliminary Layout for the Proposed New Percolation Ponds
2.6 Conclusions/Recommendations
Based on pond investigations conducted recently and reported above, the following concluding comments can be made:
1. The most recent pond investigations have confirmed that, from a hydrogeological perspective, the pond percolation rates have decreased over time, and at least 5 of the 15 ponds are now performing poorly. The City cycles the operation of all ponds continuously and does not have flexibility to take ponds out of service for an extended period for required rehabilitation to improve percolation VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES 2-21
performance. Accordingly, the City is in the early stage of implementing the design and construction of an additional approximately 40 acres of new ponds to provide operational flexibility for required routine pond maintenance to sustain the long-term performance.
2. The current effluent TSS concentration contributes to an accumulation of an organic scum layer on the bottom of the ponds, resulting in conversion of graded sandy soils to clay and silty soils. This reduces the performance of the percolation ponds and results in longer drying periods. As effluent flow rates increase, the ponds may no longer be able to dry as quickly, and may cause the available capacity to decrease rapidly. When the treatment process is upgraded to meet the new General Permit requirements, the effluent TSS concentrations are expected to be significantly lower. In the interim period, the City is considering the benefits/costs of installing a temporary filtration system to improve the effluent quality and reduce the TSS load to the ponds.
3. In order to sustain the performance of the existing ponds over the long term, the following actions were recommended:
» Update the operational procedures to include removal of the upper 2 to 4 inches of soil during the drying and rest periods. This action will require the ponds to dry out sufficiently to allow machines to enter the ponds.
» Perform deep ripping of the bottom of the ponds each time a pond has dried. » Plan for the phased removal of clayey and silty soil present within the upper 5 to 10 ft of the ponds over time. This more extensive work would require a pond to fully dry out and be out of service for more than a month while soil cleaning is taking place. This work would be scheduled once the planned new ponds are in service.
» Reduce the TSS of effluent discharge.
» Transfer remaining pooled water left in ponds at the end of a dry cycle to a settling pond or to the plant headworks instead of to an adjacent percolation pond.
The City should budget about $23 million over the next 5 to 8 years as part of an O&M budget to perform rehabilitation on all 15 existing ponds.
4. The findings from the water balance exercise showed that despite the noted decrease in percolation rates, the ponds are able to dispose of all flow that they receive. In fact, based on a detailed assessment over 18 months of operation, the ponds never accumulated more than 78 percent of their total holding capacity, indicating that the ponds can dispose of more flow than they currently receive.
5. As listed in the new General Permit, the percolation disposal capacity is noted as a daily capacity and limited to 8.0 mgd. Daily plant influent data shows that the ponds have been receiving flows that exceed 8.0 mgd at times, even after the recalibration of the influent flow meter in September 2023.
The City has had to report such violations based on the daily permitted flow. The water balance analysis has shown that the pond capacity easily exceeds a daily average of 8.0 mgd. Therefore, assuming that the pond system has the equivalent of the largest pond out-of-service, it is recommended that the permitted capacity of the ponds be modified to a monthly average of
8.3 mgd. This request will be submitted to the Water Board and should see the City through to the point where additional pond capacity has been constructed, after which the monthly average flow can be adjusted again.
6. The listed pond area in the new General Permit is 123 acres. The most recent aerial survey data has shown that the actual pond percolation area is 80.4 acres.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES
APPENDIX B CITY OF SANTA MARIA WWTP -
PERMIT MODIFICATION REQUEST
CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
ATTACHMENT A 1
Technical Memorandum
City of Santa Maria - Wastewater Treatment Plant
Subject:
Prepared for:
Prepared by:
Date:
Minor Modification Request – Additional Pond Locations
Central Coast Regional Water Quality Control Board
Christos A. Stoyos, P.E., City of Santa Maria
April 10, 2024
This technical memorandum (TM) presents the City of Santa Maria’s plans to construct three additional ponds to increase seasonal effluent retention and to assist current efforts to evaluate the WWTP’s percolation pond capacity and performance.
The area where the City proposes to expand this additional retention capacity is at the southeast corner of the WWTP property. This area had accommodated two larger ponds in the past, and prior to the 2008 WWTP upgrade which added a new primary clarifier and a new primary trickling filter. The photo included below shows the approximate size and location of these two ponds in the 2002 aerial photo.
CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
ATTACHMENT A 2
Three new ponds with the following characteristics will be constructed on the available land:
POND
ID
POND
AREA
(acres)
POND
RETENTION
CAPACITY
(acre-feet)
A-1 0.63 2.05
A-2 0.14 0.43
A-3 0.40 1.67
TOTALS 1.17 4.13
The proposed ponds do not necessarily increase disposal capacity but do provide for additional effluent retention and additional “rest period” to assist with routine maintenance and specifically with the evaluation of the existing pond percolation performance where additional time is needed to accommodate geotechnical investigations.
The drawings accompanying this TM illustrate the location and the geometry of the new ponds, the effluent circulation piping, and the proposed sample points. Standard freeboard equals or exceeds 2 feet in all three ponds.
The City will increase sample monitoring and incorporate these three new ponds in the Monitoring and Reporting Program No. R3-2023-0032 and upload all necessary effluent sample information to GeoTracker.
The City values that this minor improvement will alleviate immediate concerns due to the wet weather, will benefit the WWTP operations and routine pond maintenance schedule, and will assist our efforts to evaluate percolation pond capacity and performance. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ABCDEFGHJKLMNP DATE: CHECKED BY: DESIGNED BY: SHEET LETTER DATE DATE 0F SHEETS REFERENCESFILE NUMBER CITY OF SANTA MARIA DEPARTMENT OF UTILITIES SCALE: DATE: APPROVED REVISION WWTP SITE PLAN PERMIT MODIFICATION REQUEST CITY OF SANTA MARIA - WWTP POND 14 POND 15 POND 12 POND 13 POND 11 DKC WASH POND 7 POND 5 POND 1 POND 3 POND 8 POND 6 POND 4 POND 2 SLUDGE DRYING BEDS SLUDGE DRYING BEDS SLUDGE DRYING BEDS WWTP OPERATIONS A-1 A-2 A-3 IS-1 ES-1 P/L P/L P/L P/L P/L P/L P/L P/L RAY RD ENGEL & GRAY COMPOST FACILITY 1"=200' 3/29/2024 1 2 POND EXPANSION AREA SEE SHEET 2 OF 2 0 200 400 Feet 1:2400 200 WWTP SITE PLAN SCALE: 1" = 200' NEW POND INFORMATION POND ID POND AREA (ACRES) POND RETENTION CAPACITY (ACRE-FEET) A-1 0.63 2.03 A-2 0.14 0.43 A-3 1.17 4.13 TOTALS 1.17 4.13
BLACK RD WWTP ENTRANCE CAS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ABCDEFGHJKLMNP DATE: CHECKED BY: DESIGNED BY: SHEET LETTER DATE DATE 0F SHEETS REFERENCESFILE NUMBER CITY OF SANTA MARIA DEPARTMENT OF UTILITIES SCALE: DATE: APPROVED REVISION POND EXPANSION LAYOUT & TYPICAL POND CONSTRUCTION PERMIT MODIFICATION REQUEST CITY OF SANTA MARIA - WWTP 1"=50' 3/29/2024 2 2 A-1 A-2 A-3 BLACK RD P/L P/L P/L P/L ES-1 EFFLUENT SAMPLING POINT IS-1 INFLUENT SAMPLING POINT NTS NOT TO SCALE P/L WWTP PROPERTY LINE MAXIMUM EFFLUENT LEVEL INDICATES DIRECTION OF FLOW 159.56 SPOT ELEVATIONS SAMPLING LOCATION WWTP ENTRANCE Feet 0 50 100 IS-1 ES-1 2A PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC POND EXPANSION LAYOUT SCALE: 1" = 50' A/2 NTS 10' - 15' VARIES 2:1 2' TYP. 3:1 TYP. VARIES TYPICAL POND CONSTRUCTION LEGEND & ABBREVIATIONS PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC WWTP OPERATIONS FREE BOARD CAS VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES
APPENDIX C YEH AND ASSOCIATES
GEOTECHNICAL DATA REPORT
GEOTECHNICAL DATA REPORT
City of Santa Maria Wastewater Treatment Plant
Percolation Pond Study
601 Black Road, Santa Maria, California
Yeh Project No.: 223-184
March 20, 2025
Prepared for:
Carollo Engineers
3150 Bristol Street, Suite 500
Costa Mesa, CA 92626
Attn: Graham Juby, PE
Prepared by:
Yeh and Associates, Inc.
391 Front Street, Suite D
Grover Beach, California 93433
Phone: 805-481-9590
391 Front Street, Suite D
Grover Beach, CA 93433
(805) 481-9590
www.yeh-eng.com
Colorado California
Denver | Colorado Springs | Durango | Glenwood Springs | Grand Junction | Greeley Grover Beach | Ventura March 20, 2025 Project No. 223-184
Carollo Engineers
3150 Bristol Street, Suite 500
Costa Mesa, CA 92626
Attn: Mr. Graham Juby, PE
Subject: Geotechnical Data Report, City of Santa Maria Wastewater Treatment Plant, Percolation Pond Study, 601 Black Road, Santa Maria, California Mr. Juby:
Yeh and Associates, Inc. is pleased to submit this geotechnical data report for the Santa Maria Wastewater Treatment Plant Pond Percolation Study in Santa Maria, California. This data report was prepared as requested by Carollo and summarizes the field and laboratory test results collected for the project. Yeh has also coordinated with GSI Water on their hydrogeologic evaluation of the percolation of the ponds and their recommendations for improving the percolation of the ponds. This report was prepared in accordance with the Professional Services Agreement with Carollo, dated October 3, 2023.
We appreciate the opportunity to be of service. Please contact Judd King at 805-801-6416 or [email protected] if you have questions or require additional information.
Sincerely,
YEH AND ASSOCIATES, INC.
Reed Hooke, EIT Judd J. King, P.E., G.E.
Senior Staff Engineer Senior Geotechnical Engineer
Reviewed by:
Jonathan D. Blanchard, P.E., G.E.
Principal Geotechnical Engineer
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 ii
Table of Contents
1. PROJECT DESCRIPTION AND UNDERSTANDING ........................................................................ 1
1.1 PROJECT DESCRIPTION .................................................................................................................... 1
1.2 EXISTING SITE DESCRIPTION ............................................................................................................. 2
1.3 AERIAL PHOTOGRAPH REVIEW.......................................................................................................... 2
1.4 PREVIOUS STUDIES ......................................................................................................................... 3
1.5 REHABILITATION EFFORTS ................................................................................................................ 4
1.6 POND PERFORMANCE ..................................................................................................................... 6
2. FIELD EXPLORATION AND LABORATORY TESTING .................................................................... 7
2.1 CONE PENETRATION TESTING........................................................................................................... 8
2.2 TEST PITS ..................................................................................................................................... 8
2.3 DRILLING...................................................................................................................................... 8
2.4 LABORATORY TESTING .................................................................................................................... 9
3. SUBSURFACE CONDITIONS....................................................................................................... 9
3.1 REGIONAL AND SITE GEOLOGY.......................................................................................................... 9
3.2 SUBSURFACE CONDITIONS ............................................................................................................. 10
3.2.1 GEOLOGIC UNITS ................................................................................................................. 10
3.2.2 GROUNDWATER CONDITIONS ................................................................................................. 11
3.3 SUMMARY OF LABORATORY TESTS................................................................................................... 11
4. OBSERVATIONS AND CONCLUSIONS ......................................................................................13
4.1 TEST PITS ................................................................................................................................... 13
4.2 EXPLORATORY DRILLING AND CPT SOUNDINGS.................................................................................. 15
4.3 OPERATIONAL ACTIVITIES .............................................................................................................. 15
5. GEOTECHNICAL CONSIDERATIONS AND PRELIMINARY RECOMMENDATIONS .........................17
6. RECOMMENDATIONS FOR FURTHER STUDY...........................................................................19
7. LIMITATIONS.........................................................................................................................20
8. REFERENCES ..........................................................................................................................20 List of Figures
FIGURE 1: VICINITY MAP .............................................................................................................................................. 1 FIGURE 3: POWERSCREEN FOR SAND/CLAY SEPARATION (MAY 2012)................................................................................. 5 FIGURE 2: POND 12 REHABILITATION (OCTOBER 9, 2018) ................................................................................................ 5 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 iii
FIGURE 4: DRY WELL INSTALLATION - POND 6 - 2019 (RUSS NEWMAN, CITY OF SANTA MARIA) ............................................. 6 FIGURE 5: GEOLOGIC MAP (TENNYSON 1992)............................................................................................................... 10 FIGURE 6: HYDRAULIC CONDUCTIVITIES AND DRAINAGE CHARACTERISTICS (CASAGRANDE AND FADUM 1940)......................... 12 FIGURE 7: ORGANIC SCUM LAYER ................................................................................................................................ 13 FIGURE 8: POND 14, TEST PIT 10 ................................................................................................................................ 14 FIGURE 9: POND 14 – CLAY LAYERS 30-35 FEET BGS ..................................................................................................... 15 FIGURE 10: TOTAL INFILTRATION (S) IN RELATION TO SUSPENDED SOLIDS CONCENTRATION (CS) – RICE 1974.......................... 16 FIGURE 11: PROPOSED POND LOCATIONS – EAST OF BLACK ROAD .................................................................................... 19 List of Tables
TABLE 1: PREVIOUS STUDIES.......................................................................................................................................... 3 TABLE 2: POND INVENTORY........................................................................................................................................... 7 TABLE 3: SUMMARY OF SIEVE ANALYSES AND HYDRAULIC CONDUCTIVITIES......................................................................... 12 TABLE 4: COST ESTIMATES .......................................................................................................................................... 18 List of Plates
Subsurface Exploration Map (General)................................................................................................................... 1 Subsurface Exploration Map (East of Black Road) .................................................................................................. 2 Subsurface Exploration Map (SE)............................................................................................................................ 3 Subsurface Exploration Map (NE) ........................................................................................................................... 4 Subsurface Exploration Map (NW).......................................................................................................................... 5 Plant Timeline.......................................................................................................................................................... 6 Qualitative Pond Performance Map ....................................................................................................................... 7 Subsurface Profile A-A’............................................................................................................................................8 Subsurface Profile B-B’ ............................................................................................................................................ 9 Subsurface Profile C-C’..........................................................................................................................................10 Subsurface Profile D-D’ .........................................................................................................................................11 Subsurface Profile E-E’ .......................................................................................................................................... 12 Subsurface Profile F-F’...........................................................................................................................................13 Subsurface Profile G-G’ .........................................................................................................................................14 List of Appendices
Appendix A – Boring Logs, Test Pit Logs, and CPT Plots
Legend for Soil Classification.................................................................................................................. A-1 Boring Logs for Pond 4 (24E4-01 through 24E4-04).................................................................... A-2 to A-9 Boring Logs for Pond 6 (24E6-01 through 24E6-05)................................................................ A-10 to A-19 Boring Logs for Pond 14 (24E14-01 through 24E14-04) ......................................................... A-20 to A-27 Test Pit Logs for Pond 2 (24TP2-01 through 24TP2-08).......................................................... A-28 to A-35 Test Pit Logs for Pond 4 (24TP4-01 through 24TP4-07).......................................................... A-36 to A-42 Test Pit Logs for Pond 6 (24TP6-01 through 24TP6-09).......................................................... A-43 to A-51 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 iv
Test Pit Logs for Pond 8 (24TP8-01 through 24TP8-03).......................................................... A-52 to A-54 Test Pit Logs for Pond 11 (24TP11-01 through 24TP11-05).................................................... A-55 to A-59 Test Pit Logs for Pond 14 (24TP14-01 through 24TP14-14).................................................... A-60 to A-73 CPT Plot 24CPT-01 through 24CPT-30................................................................................... A-74 to A-103 Appendix B – Results of Laboratory Testing
Summary of Laboratory Test Results........................................................................................... B-1 to B-3 Sieve Analyses............................................................................................................................ B-4 to B-14 Hydrometer Analyses.................................................................................................................. B-15 to 30 Atterberg Limits ................................................................................................................................... B-31 Organic Content.......................................................................................................................... B-32 to 33 Hydraulic Conductivity ................................................................................................................ B-34 to 49 Appendix C – Historical Aerial Photos
EDR Decade Package.................................................................................................................. C-1 to C-18 Appendix D – Previous Studies and Pertinent Data
Data from 2003 ESP Pond Expansion Report............................................................................ D-1 to D-44 Data from 2006 Fugro Phase II Plant Upgrade Report including previous studies................. D-45 to D-96 Data from 2008 Fugro Pond Lithology .................................................................................. D-97 to D-100 Data from 2008 Fugro Pond Rehabilitation Report............................................................ D-101 to D-120 Data from 2011 Fugro Ponds 3 and 4 Report ..................................................................... D-121 to D-146 Data from 2018 Yeh Pond 12 Report.................................................................................. D-147 to D-175 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 1 1. PROJECT DESCRIPTION AND
UNDERSTANDING
Carollo retained Yeh and Associates to
provide geotechnical services as input to
GSI’s hydrogeologic study of the existing
percolation ponds at the City of Santa
Maria’s (City) wastewater treatment plant at
601 Black Road in Santa Maria, California.
The project location is shown in Figure 1.
The geotechnical evaluation consisted of a
program of project coordination, site
reconnaissance, field exploration, laboratory
testing, and preliminary analyses of the
subsurface conditions and operation of the
ponds from a geotechnical perspective. Yeh
prepared a Geotechnical Memorandum (Yeh
2024) that summarized previous studies, site
reconnaissance observations and presented
a plan for subsurface exploration of the
site. Selected data from that
memorandum is included in this report.
1.1 PROJECT DESCRIPTION
The project consists of a hydrogeologic study of the capacity and performance of fifteen existing percolation ponds at the Santa Maria Wastewater Treatment Plant (WWTP). Plant staff have reported that the existing approximate 85 acres of percolation ponds are currently not adequately percolating treated effluent based on pond level measurements and influent flow. The City periodically allows the ponds to dry and then aerates them with a disk to a depth of about two feet and then refills them. A contractor initially removed an organic scum layer that forms on the bottom of the ponds, but that is no longer being performed. The percolation performance of the ponds could impact the amount of wastewater the plant can process. The goal of the project is to evaluate subsurface conditions and operational characteristics of the existing disposal ponds to develop options for improving percolation potential. A proposed expansion area on the east side of Black Road was also explored but not evaluated as part of the scope for this phase of the project. This area is planned to be addressed in a future phase of work.
Figure 1: Vicinity Map
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 2 1.2 EXISTING SITE DESCRIPTION
The City of Santa Maria’s Wastewater Treatment Plant (Plant) is located west of Black Road in Santa Maria, California as shown on Figure 1. The existing facility has a design operating capacity of 13.5 MGD with average 2023 flows of 7.68 MGD (City 2024a). The plant was originally constructed in the 1930s with upgrades to the plant in the 1960’s, 1990’s and a recent upgrade in 2007. A potential expansion area for new ponds and or an entire new plant facility is located on the east side of Black Road east and southeast of the existing plant. The site is bordered by Stowell Road to the south, Ray Road to the west, and agricultural land to the north and east. Land use in the site vicinity is primarily agricultural. A composting facility occupies the southwestern portion of the plant site.
Topography in the project vicinity is defined by relatively flat with natural grades generally sloping north toward the Santa Maria River at grades of approximately five percent. The ground surface elevation at the project site ranges from approximately elevation 132 feet to 168 feet (City 2024b).
Gravel roads are located throughout the site to provide access to the ponds and the WWTP.
1.3 AERIAL PHOTOGRAPH REVIEW
Historic aerial photographs taken between 1938 and 2020 (about one to two per decade) were obtained from Environmental Data Resources, Inc. (EDR 2024) and reviewed for this project. Those photos were reviewed to evaluate changes in land use, topography, geomorphic features, and other characteristics pertinent to the site geology and geotechnical considerations discussed in this report.
The aerial photos from EDR are provided in Appendix C with the project area shown on each photo.
The following observations were made during the review:
• The 1938 and 1943 photos show a structure in the east area of the site and horizontal lines west of the existing plant facility that are likely disposal trenches for effluent. The primary land use surrounding the site appears to have been agricultural. • Two new clarifiers or filters and an earthen rectangular basin are present in the 1949 photo and roads are present around the new plant. The effluent disposal area west of the new plant continues to be disposal trenches and possibly spray fields. • A pond is present immediately west of the plant in the 1954 photo and no other changes are observed in the remaining portion of the site.
• Three ponds are present in the 1960 photo. Two ponds, possibly used for irrigation, are about 2,000 feet west of the plant and one pond is about 2,500 feet southwest. The spray fields have been developed with diagonal lines that are likely irrigation pipes used in the distribution of effluent.
• The 1967 photo shows two additional clarifiers and two trickling filters have been added to the plant. The sludge drying beds have also been constructed immediately west of the expanded plant. Ten ponds have been constructed immediately west of the plant site. The three ponds observed in the 1960 photo are no longer present. Spray fields remain along the southern boundary.
• No significant changes are observed in the 1975 and 1978 photos.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 3 • In the 1981 photo, additional sludge drying beds and four ponds have been added to the eastern half of the plant area. Ponds 1 through 8 are now visible. Sixteen square ponds have been constructed west of the main portion of the plant. • No significant changes are visible in the 1994 photo. • In the 2002 photo, eight of the smaller ponds in the southwestern portion of the site have been transformed to a composting facility and four ponds remain in that area. Five additional ponds have been constructed in the northwest area of the site. Water is present in 15 of the 18 ponds that are visible in the photo.
• No significant changes are visible in the 2006 photo. • Two small ponds that were located immediately east of the compost facility are no longer present in the 2009 photo. Additional structures are also visible within the main portion of the plant which were a part of a 2007 upgrade at the plant. A berm has been constructed on the north end of Pond 7 separating it from the DKC pond. • No significant changes are visible in the 2012 photo. • The compost facility has expanded eastward, and two ponds have been removed in the 2016 photo leaving 15 ponds visible. Water is in all but two ponds. • No significant changes are visible in the 2020 photo.
1.4 PREVIOUS STUDIES
Yeh reviewed previous studies and geotechnical data prepared for the existing ponds and the WWTP facility as input to this study. Maps showing the locations of previous explorations and explorations performed by Yeh for this study are shown on Plates 1 through 5. A plant timeline including previous studies, plant improvements, pond construction, and significant rain events is shown on Plate 6.
Previous studies reviewed are summarized in Table 1 and selected boring logs, trench logs and laboratory data from these studies are included in Appendix D.
Table 1: Previous Studies
Report Area of Study Exploration
Performed Summary of Findings
Soils Engineering
Report for Percolation
Pond Expansion, Earth
Systems Pacific (2003)
Area of proposed
pond expansion
east of Black Road
7 borings to depths
of 51.5 to 60 feet
below the ground
surface.
Alluvium encountered in borings consisted of
poorly-graded Sand (SP) and Clayey Sand (SC)
with layers of Silt (ML) approximately 1 to 10 feet
thick at various elevations of approximately 112
to 165 feet. Hydraulic conductivity ranged from
approximately 2.6E-08 to 1.2E-03 cm/s in silty
materials and from approximately 1.2E-05 to
1.0E-02 cm/s in sandy materials.
Geotechnical Report
for Santa Maria WWTP
Upgrades – Phase II,
Fugro (2006)
Treatment Plant
Area
13 borings to
depths of 20.5 to 51
feet below the
ground surface
Alluvium encountered in borings consisted of
poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SC, SP-SM) and layers of Silt
and Clay (CL, ML, and CL-ML) approximately 1 to
18.5 feet thick at various elevations of
approximately 124.3 to 164.7 feet. Hydraulic
conductivity of samples of Silty Sand (SM) and
poorly-graded Sand with Silt (SP-SM) ranged
from approximately 2.0E-05 to 4.0E-03 cm/s.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 4 Report Area of Study Exploration
Performed Summary of Findings
Geotechnical Report
for Percolation Pond
No. 1 Rehabilitation,
Fugro (2008)
Pond No. 1
16 test pits to
depths of 3 to 15
feet below the
ground surface
Alluvium encountered in test pits consisted of
poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SC, SP-SM) with layers of Clay
(CL and CH) approximately 1 to 4.5 feet thick at
various elevations of approximately 142.5 to 149
feet. Hydraulic conductivity ranged from
approximately 7.6E-03 to 8.1E-02 cm/s.
Percolation Pond
Lithology and
Materials Assessment,
Fugro (2008)
Treatment Plant
Area and Ponds
No. 1, 2, 5, and 7
11 borings to
depths of 8.3 to
30.5 feet below the
ground surface
Alluvium encountered in borings consisted of
Poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SC, SP-SM) with layers of Clay
and Silt (CL, ML, and MH) approximately 0.5 to 4
feet thick at various elevations of approximately
131 to 163 feet. Hydraulic conductivity ranged
from approximately 1.6E-06 to 1.2E-02 cm/s.
Geotechnical Report
for Percolation Ponds
No. 3 and 4, Fugro
(2011)
Ponds No. 3 and 4
16 test pits to
depths of 5 to 15
feet below the
ground surface
Alluvium encountered in test pits consisted of
Poorly-graded Sand with varying amounts of Silt
(SP, SM, SP-SM) with layers of Clay and Silt (CL
and ML) approximately 1 to 9.5 feet thick at
various elevations of approximately 145 to 165
feet. Hydraulic conductivity ranged from
approximately 7.1E-06 to 6.1E-03 cm/s.
Geotechnical Report
for Percolation Pond
No. 12 Rehabilitation,
(Yeh 2018)
Pond No. 12
16 test pits to
depths of 7 to 12
feet below the
ground surface
Alluvium encountered in test pits consisted of
poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SP-SM, SP-SC) with layers of
lean Clay (CL) approximately 0.5 to 3.5 feet thick
at various elevations of approximately 131.5 to
139 feet.
The findings from these studies show that drainage, capacity, and pond performance have continually been issues at the plant and need to be addressed in order for the ponds to dispose of treated water from the plant.
1.5 REHABILITATION EFFORTS
The City has performed various efforts to rehabilitate or improve the percolation of the ponds over the past 20 years. A summary of projects and estimated percolation rates are provided in Section 1.6 and Table 2. Efforts have included the following:
• Removing approximately 5 feet of soil from the bottom of ponds and replacing the excavated soil with imported sandy soil. Plant staff stated that the removal and replacement was performed in the early 2000’s for Ponds 1 through 3 (Wallace 2011) and in 2018 for the western half of Pond 12. A photo of Pond 12 that was rehabilitated in 2018 is shown in Figure 2. These efforts have improved the percolation of the ponds relative to the ponds that did not receive any rehabilitation efforts.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 5 • Removing the scum layer from the
bottom of the ponds following
percolation. The City had retained a
contractor to scrape and remove the
upper 2 to 6 inches of soil from the
ponds about 1 to 2 weeks after use and
once the bottom of the pond had dried.
The intent of this process was to remove
an organic scum layer that typically
forms and remains on the surface soil at
the bottom of the pond following
percolation. The City no longer has a
contractor for these services and the City has resumed discing the organic layer back into the upper 1 to 2 feet of the soil in the pond bottoms after each drying cycle. The previously rehabilitated ponds initially performed better than other ponds, but percolation rates have slowed according to the City. Not removing the scum layer has likely contributed to the reduced percolation potential.
Figure 3: Pond 12 Rehabilitation (October 9, 2018)
Figure 2: Powerscreen for Sand/Clay Separation (May 2012) Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 6 • Processing a portion of soil within the ponds using a sand/clay separator. This was performed in Ponds 1, 2, 3, and 5 in 2012 in an effort to remove fines from the pond subgrade. The soil within the upper 5 feet of the pond bottom was processed using a Cheiftan 17001 and then through a Powerscreen Trident 1 to separate clay and sand particles in a water bath. The City has referred to this equipment at “The Beast”. The clay soil was segregated and disposed of within the berms around various ponds while sandy soil from the berms was placed back into the bottom of the ponds to supplement the processed subgrade material. A photo of the machine is included in Figure 3. This effort did improve the percolation potential of the ponds that were rehabilitated.
• Installing dry wells to depths of about 20 feet in Pond 6 in 2019. According to an email from Mr. Russ Newman, the Plant Manager, four, 30-inch diameter dry wells were constructed in the northern bottom of Pond 6 in 2019. The wells were constructed by drilling holes and backfilling them with imported sand. A photo of the drill rig and one of the open holes prior to sand placement is shown in Figure 4. We understand that there wasn’t a discernable percolation rate improvement after this method was used according to plant staff.
1.6 POND PERFORMANCE
Yeh requested information about the performance of each pond from plant staff. Mr. Newman provided qualitative information as well as quantitative data about the performance of the ponds.
Details about each pond’s construction date, rehabilitation, and percolation performance reported by Mr. Newman to Yeh in 2023 are presented in Table 2. “N/A” indicates that no information was reported for those ponds or items. A map summarizing pond performance is shown on Plate 7. 1 https://www.powerscreen.com/en/equipment/screening/inclined-screens Figure 4: Dry Well Installation - Pond 6 - 2019 (Russ Newman, City of Santa Maria) Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 7 Table 2: Pond Inventory
Pond ID
Approximate Pond
Construction Timeframe
(according to aerial imagery –
See Appendix C)
Reference Reports Rehabilitation
Performed
Estimated
Percolation rate
in 2023 (City of
Santa Maria)
In/day
1 1960 - 1967
Pond 1 Rehab, Fugro (2008)
Lithology and Materials
Report, Fugro (2008)
Sand/Clay Separator:
2012
Unknown method:
2001 and 2018
5-8 in/day
2 1978 - 1981 Lithology and Materials
Report, Fugro (2008)
Sand/Clay Separator:
2012
Unknown method:
2001 and 2018
5-7 in/day
3 1960 - 1967 Fugro (2011)
Sand/Clay Separator:
2012
Unknown method:
2001 and 2018
5-7 in/day
4 1978 - 1981 Fugro (2011) N/A 2-4 in/day
5 1960 - 1967 N/A
Sand/Clay Separator:
2012
Unknown method:
2018
5-6 in/day
6 1978 - 1981 N/A Dry wells installed in
2019 2-4 in/day
7 1960 - 1967 Lithology and Materials
Report, Fugro (2008) N/A 2-4 in/day
8 1978 - 1981 N/A N/A 2-4 in/day
9 1994 - 2002, Decommissioned
2012 - 2016 N/A N/A N/A
10 1994 - 2002, Decommissioned
2012 - 2016 N/A N/A N/A
11 1994 - 2002 N/A N/A 3-5 in/day
12 1994 - 2002 Yeh (2018) Clay lens removed from
eastern half in 2018 4-5 in/day
13 1994 - 2002 N/A N/A 3-4 in/day
14 1994 - 2002 N/A N/A 2-4 in/day
15 1994 - 2002 N/A N/A 3-5 in/day
DKC 1994 - 2002 N/A N/A 4-6 in/day
Wash
Pond A 2009-2012 N/A N/A 2-3 in/day
2. FIELD EXPLORATION AND LABORATORY TESTING
Yeh performed a field exploration program that included drilling, Cone Penetration Test (CPT) soundings, and test pits as well as laboratory testing of selected samples recovered from the test pits and borings. Exploration locations for this project and the previous studies mentioned above are shown on Plates 1 to 5. Boring, CPT, and Test Pit logs, and laboratory test results are included in appendices A and B. Yeh’s field exploration within the pond bottoms focused on poor performing Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 8 ponds (Ponds 4, 6, 8, 11, and 14) and better performing ponds (Ponds 2 and 11) to evaluate the boundary conditions.
2.1 CONE PENETRATION TESTING
CPT services for the project were provided by Gregg Drilling of Signal Hill, California. Gregg advanced 30 CPT soundings during the period of March 18 to 21, 2024. The soundings were advanced to depths of approximately 30 to 65 feet below the ground surface using a hydraulic ram mounted inside a 20- ton truck.
The CPT soundings were performed in general accordance with ASTM D 5778-12 using an electric piezocone penetrometer. The piezocone had a diameter of approximately 1.8 inches (4.5 centimeters), a tip area of 15 square centimeters, and a sleeve area of approximately 225 square centimeters. Cone tip resistance (qc), sleeve friction (fs), and penetration pore water pressure (u) measured from a transducer placed behind the tip (in the u2 location) were recorded continuously during penetration using an on-board computer. The friction ratio (FR, the ratio of the sleeve friction to the tip resistance in percent) was computed for each value of qc and fs recorded. These data and soil behavior type classifications were used in subsequent geotechnical analyses and to evaluate soil types and boundaries for analyses. Approximate locations of the CPT soundings are presented on Plates 1 to 5. A report and logs of the CPT soundings are presented in Appendix A.
2.2 TEST PITS
Backhoe services for the test pits for this project were provided by Joseph Engineering of Santa Maria, California. Joseph excavated 46 test pits throughout the project site. Test pits were excavated for Pond 2 on March 27, Pond 14 on April 3, and Ponds 4, 6, 8, and 11 on April 25 to 26. Test pits were excavated to depths of approximately 4.5 to 12 feet below the ground surface with a John Deere 310 Backhoe. The test pits are labeled with the year of exploration, the pond number and the test pit number. For example, 24TP2-01 is test pit number one, dug in pond 2, in 2024. Approximate locations of the test pits are presented on Plates 1 to 5. Logs of the test pits are presented in Appendix A.
2.3 DRILLING
Drilling services were provided by Britton Exploration of Los Gatos, California. Britton used a track mounted CME 55 drill rig equipped with 8-inch hollow stem augers to advance 13 exploratory borings to depths of 31 to 34.5 below the ground surface between June 24 and 26, 2024 in Ponds 4, 6, and
14. Yeh personnel logged the subsurface conditions encountered during the drilling and collected samples for subsequent laboratory testing. Sampling within the borings (with the exception of 24E6- 05) was performed by using a CME continuous coring system in conjunction with taking drive samples. Boring 24E6-05 was sampled with continuous drive samples beginning at a depth of 1 foot.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 9 The CME core is a fixed sampler that is pushed into the ground as the augers remove the soil and rock from around the barrel during drilling. The sampler is 5 feet long with a 4-inch outside diameter and a
2.75-inch core diameter. The split barrel was oriented to provide reference to north. Samples from the recovered core are disturbed and mainly used for classification, although intact specimens were sometimes taken from the core for testing. Approximately 6-inch-long samples were trimmed from the core in the field, placed wrapped in plastic, and labeled. The length of the core and recovery were noted and are shown on the logs in Appendix A.
Drive samples were collected using either a modified California or standard penetration test (SPT) split spoon sampler at intervals of 5 feet. The SPT sampler has a 2-inch outside diameter, a 1-3/8 inch inside diameter and is equipped for but was used without liners. The modified California sampler has a 3-inch outside diameter, a 2-3/8 inch inside diameter and was used with 1-inch-high brass liners.
Drive samples were collected using a 140-lb automatic trip hammer in accordance with ASTM D-1586 (the Standard Penetration Test) procedures. Upon completion, the borings were backfilled with native material.
The borings are labeled with the year drilled, the pond number, and the boring number. For example, 24E6-05 is boring 5, drilled in Pond 6, in 2024. Maps showing the approximate locations of the borings are presented on Plates 1 to 5. The logs of the borings are presented in Appendix A.
2.4 LABORATORY TESTING
Laboratory testing was performed on selected samples recovered from the test pits and borings. Test results are presented in Appendix B. Selected tests for unit weight, moisture content, gradation, and pH and resistivity were performed at the Yeh office and laboratory in Grover Beach, California. Tests for organic content were performed at Cooper Testing Labs in Palo Alto, California. Tests for hydraulic conductivity and gradation were performed on soil samples at the California Polytechnic State University Geotechnical Engineering Lab in San Luis Obispo, California. All testing was performed in accordance with applicable ASTM standards.
3. SUBSURFACE CONDITIONS
3.1 REGIONAL AND SITE GEOLOGY
The regional geology in the site vicinity as mapped by Tennyson (Tennyson 1992) is shown on Figure 5. The project site is located within the Coast Ranges geologic and geomorphic province, which extends from the Transverse Ranges in southern California to the Klamath Mountains in northern California and into Oregon. The province is characterized by north-northwest trending mountain ranges composed of sedimentary, volcanic, and metamorphic formations comprised predominately of Jurassic and Cretaceous age rocks with Tertiary to Quaternary age rocks commonly overlying the Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 10 older formations along the flanks and foothills of those ranges. Recent sediments of alluvium and colluvium are found above the rock within intervening drainages, valleys, and coastal areas.
Regional-scale geologic structure is characterized by a series of northwest trending faults that are mostly associated with compression occurring between the Pacific Ocean and the Transverse Range.
Locally mapped faults include the Santa Maria Fault, the Bradley Canyon Fault, and the Garey Fault (USGS 2024). The Santa Maria Fault is mapped as trending northeast approximately 3 miles east of the project site, the Bradley Fault is mapped as trending north approximately 6 miles east of the project site, and the Garey Fault is mapped as trending north approximately 7.5 miles southwest of the project site. The site is mapped by Tennyson (1992) as Quaternary aged alluvium (Qal). The site is also mapped by Dibblee (Dibblee 1994), but the project site is obscured on that map by an information text block, hence why the Tennyson (1992) map is used in Figure 5, but it is presumed to also be mapped as Quaternary aged valley floodplain alluvium (Qa).
3.2 SUBSURFACE CONDITIONS
3.2.1 GEOLOGIC UNITS
Yeh’s subsurface characterization is based on the subsurface conditions logged in the test pits, borings, and CPTs performed by Yeh and previous studies. The approximate locations of the borings Figure 5: Geologic Map (Tennyson 1992)
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 11 and subsurface profiles are presented on Plates 1 to 10. Artificial fill (Af) and Alluvium (Qal) were encountered within the explorations and are described below. Interpreted subsurface profiles A-A’ to E-E’ showing the units encountered are presented on Plates 6 to 10.
Artificial Fill (Af). The berms surrounding the ponds consist of artificial fill. The unit was not encountered in the test pits and borings but was encountered in the CPTs. The unit consisted mainly of sand with varying amounts of silt and clay. The alluvium was encountered below the fill to the maximum depths explored. Artificial fill is also present within the bottom of ponds as a result of original pond construction and rehabilitation efforts.
Alluvium (Qal). Alluvium was encountered in all the test pits and borings from the ground surface to the maximum depth explored of 34.5 feet below the ground surface. The unit was also encountered in the CPT soundings from near the elevation of the pond bottoms to the maximum depths explored of 65 feet below the ground surface. The alluvium consisted of very loose to dense poorly to well graded sand with varying amounts of clay and silt (SP, SW, SC, SC-SM, SP-SM SP-SC, SW-SC), soft sandy silt (ML), and intermittent discontinuous layers of very soft to stiff lean to fat clay and silty clay (CH, CL, CL-ML).
3.2.2 GROUNDWATER CONDITIONS
Groundwater was encountered in borings 24E4-02 to -04, and 24E6-01, -02, and -05 at depths of 20 to 30 feet below the ground surface (approximately elevation 116 to 125 feet). Depth to groundwater in monitoring wells DWM-1 and DWM-2 located at the plant varied (see Plate 1) from 87 to 125 feet below the ground surface (approximate elevation 35 to 73 feet). However, we understand that the screened intervals of these wells are within a lower aquifer. Perched water was also observed immediately above clay layers within the test pits. Seepage from inundated ponds into dry ponds was also noted. The perched water is likely remnant from the percolation of effluent from the ponds.
Overall, soil moisture and groundwater conditions will vary seasonally and due to variations in storm runoff, irrigation, groundwater pumping, and pond disposal in the site vicinity.
3.3 SUMMARY OF LABORATORY TESTS
Mechanical sieve analysis and hydrometers were performed on 29 samples collected from the test pits and borings. Hydraulic conductivity testing was performed on sixteen of the samples tested for sieve analyses. Test results are summarized in Table 3. Values highlighted in red are considered low permeability: essentially impervious relative to pond percolation rates. Well-drained materials are typically those soils having hydraulic conductivity of 10-3 centimeters per second or faster. The table includes values from the current study and Fugro’s 2008 and 2011 studies (Fugro 2008a, Fugro 2011).
Figure 6 provides typical hydraulic conductivity values based on soil type (Casagrande and Fadum 1940). The range of hydraulic conductivity for the well-draining ponds at this site are highlighted in Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 12 green and the range for the poorly draining ponds are highlighted in red. Based on the comparison of the calculated and typical values, it appears that the test results correlate to the typical value ranges.
Table 3: Summary of Sieve Analyses and Hydraulic Conductivities Pond No. Test
Pit/Boring
No.
Depth
(ft)
Soil Type Gravel
(%)
Sand (%) Fines
(%)
Hydraulic
Conductivity
(cm/sec)
4 24E4-01 20 4” Poorly Graded SAND with
1” layer of lean CLAY
0 73 27 1.3 x 10-6
4 24E4-01 30 Poorly Graded SAND with Silt 0 95 5 9.1 x 10-3 6 24E6-02 30 Sandy lean clay 0 45 55 2.3 x 10-7
6 24E6-03 30 Silty SAND 0 59 40 1.1 x 10-5
14 24E14-01 30 Sandy lean clay 0 39 61 2.5 x 10-6
14 24E14-02 25 Poorly graded sand 0 97 3 9.6 x 10-3
2 24TP2-02 2 Poorly graded sand -- -- -- 1.9 x 10-3
2 24TP2-04 2 Poorly graded sand -- -- -- 6.4 x 10-4
6 24TP6-01 4 SILT -- -- -- 1.2 x 10-6
6 24TP6-06 3.5 Poorly graded sand -- -- -- 1.3 x 10-2
6 24TP6-07 3 Silty CLAY -- -- -- 5.4 x 10-7
6 24TP6-09 3 Sandy SILT -- -- -- 6.8 x 10-4
11 24TP11-05 5 Sandy SILT -- -- -- 6.8 x 10-4
14 24TP14-04 4 Sandy Fat CLAY -- -- -- 5.0 x 10-7
14 24TP14-07 3.5 Silty CLAY with Sand -- -- -- 1.9 x 10-7 14 24TP14-11 2.5 Sandy Fat CLAY -- -- -- 1.8 x 10-7
1 Fugro T4 7.5 Poorly graded SAND with silt -- -- 10 7.6 x 10-3 1 Fugro T5 2 Poorly graded sand -- -- 1 2.7 x 10-2
1 Fugro T9 2 Poorly graded sand -- -- 1 8.1 x 10-2
1 Fugro T16 8.5 Poorly graded sand -- -- 2 4.2 x 10-2
3 Fugro T3-5 5 Poorly graded sand -- -- 2 3.1 x 10-3
3 Fugro T3-
L2 4 Silty sand -- -- 14 6.9 x 10-4
4 Fugro T4-6 5 Lean clay -- -- -- 7.1 x 10-6
4 Fugro T4-7 8 Poorly graded sand with silt -- -- 9 6.1 x 10-3 a.a x 10-z Material considered to have poor to practically impervious drainage capabilities (see Figure 6) Figure 6: Hydraulic Conductivities and Drainage Characteristics (Casagrande and Fadum 1940) Green zone is good permeability; light red is poor permeability.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 13 4. OBSERVATIONS AND CONCLUSIONS
Below is a summary of Yeh’s observations from our analysis of the previous and current studies’ explorations.
4.1 TEST PITS
Test pits were excavated in various ponds in coordination with the City. Once the ponds were allowed to dry a total of 46 test pits were excavated within Ponds 2, 4, 6, 8, 11, and 14 to depths up to 10 feet. The following was noted in the test pit excavations:
• An organic scum layer was present across the bottom of the ponds. Once the ponds dry the organic material desiccates and cracks similar to fine grained soil. Testing of selected samples of the material had organic contents that ranged from near zero to over 56 percent. The organic layer is estimated to have a thickness of about 0.25 inches. Photos of the material at the bottom of a pond is shown in Figure 7 in both the wet and dry condition. Organic material is not solely the controlling factor regarding how well a pond will percolate. However, as the silt and clay from the organic matter is mixed into the underlying sand resulting in increased fines that reduce the percolation rate of the soil at pond bottom. For instance, if the upper 1- Figure 7: Organic Scum Layer
(left: wet condition, right: dry condition)
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 14 foot of the pond is poorly graded or well graded sand, it is estimated that after about five drying and mixing cycles the soil will transition to silty or clayey sand. The surface soil will eventually become clay or silt after additional cycles of drying and mixing which were observed in the test pits. The percolation performance is being impacted by not removing the organic layer that forms from effluent disposal.
• Material exposed in the test pits varied from poorly graded sand (dark brown to black soil in Figure 8) to sandy lean clay (light gray to brown). The predominant material was generally sandy; however, layers of clay and silt were found within the test pits which even extended across some of the ponds. However, these layers were generally discontinuous across the approximate 85 acres of ponds based on subsurface data. Perched water or saturated soil conditions were observed immediately above some of the layers of clay and silt. The clay and silt layers are impacting the ability of the ponds to dispose of effluent by acting as aquitards to the vertical movement of water.
• Sandy soil in the test pits was black in many
areas. This is due to the amount of organic
material or Total Suspended Solids (TSS) from
the effluent, nitrogen consumption and
chemical interactions of the constituents of the
effluent with the soil. Studies have shown that
increased TSS from effluent increases bacterial
growth and reduces soil percolation. The soil
and water chemistry of the disposal process is
complex (Vandevivere and Baveye 1992).
• Ponds are dried by pumping the remaining
effluent to a different pond and allowing the
pond to sit for a period of one to two weeks
while it dries. Desiccation cracks form in the
bottom of the ponds once the ponds are dried. Desiccation cracking indicates an increase in the clay and silt (fines). The increase in fines content is attributed to the organic scum layer that was observed in ponds following percolation and has then been disked into the soil at the bottom of the pond as part of routine operations.
Figure 8: Pond 14, Test Pit 10
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 15 4.2 EXPLORATORY DRILLING AND CPT SOUNDINGS
Thirty CPT Soundings and thirteen exploratory borings were advanced below the ground surface at the site. CPT soundings were constrained to the berms surrounding the ponds while borings were drilled within the bottom of Ponds 4, 6, and 14. The depths of the CPT soundings varied from approximately 30 to 65 feet below the ground surface and the depths of the borings ranged from approximately 31 to 34.5 feet below the ground surface.
Similar subsurface conditions were encountered as within the test pits. Clay and silt layers were commonly encountered to depths of approximately 10 feet below the bottoms of the ponds but were also encountered within borings and CPTs at depths greater than 10 feet below the pond bottoms.
Subsurface profiles including the estimated extents of the predominant clay and silt layers encountered are shown on Plates 9 through 12. A photo of a sample from a clay layer encountered from 30 to 35 feet in a boring in Pond 14 is shown in Figure 9, indicated by the purple arrows.
4.3 OPERATIONAL ACTIVITIES
Yeh met with City staff to inquire about plant operations and methods used to move water between ponds, maintenance of ponds, and pond performance. The following summarizes some of the key points from those discussions and Yeh’s observations.
• Plant staff use surface pumps and sumps to transfer water between ponds as part of the cycling of the percolation process. Sumps are low spots excavated into the bottom at the low end of each pond. Water is pumped from these sumps and transferred to other ponds. As the water level drops in the ponds the Total Suspended Solids (TSS) content becomes higher than the initial TSS of the effluent being pumped into the ponds due to disturbance in the bottom of the pond where the organic scum layer has collected. Transferring the water (as shown in Figure 9: Pond 14 – Clay Layers 30-35 feet BGS
Purple arrows identify clay layers.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 16 the left photo of Figure 7) towards the end of the pond cycle moves water with a higher TSS than the plant effluent to other ponds. High TSS water is being transferred from one pond to another without reducing the TSS which is likely contributing to the poor percolation performance of the ponds.
• Once the ponds are in a dry condition, the ponds are disced using a tractor to pull a harrow across the ponds and break up the organic layer within the upper 2 to 3 feet of the bottom of the ponds. The bottom of the ponds is then graded to slope to the transfer sump and the pond is then placed back in service. We understand that this process takes about two to three weeks to complete depending on the time of year, with a shorter amount of time needed to complete the operation in the summer and fall.
• The 2023 average TSS of effluent from the plant entering the percolation ponds was 41 milligrams per liter (City 2024a). The bottom of the ponds act as a filter where a portion of the suspended solids are retained which leads to the formation of the organic layer across the bottom of the ponds that ranges up to 0.25 inches thick. Research on the impact of TSS on percolation capabilities has shown that there is a decrease in the ability for effluent to move through soil as the TSS increases above 5 milligrams per liter (Rice 1974). A plot from Rice (1974) comparing the decrease in infiltration rate (S) to an increase in TSS (Cs) is shown in Figure 10: Total Infiltration (S) in relation to suspended solids concentration (Cs) – Rice 1974 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 17 Figure 10. The purple arrow points to the average TSS of Santa Maria’s WWTP effluent entering the ponds for disposal in 2023. Additional discussion of impact of effluent quality on percolation potential is provided in the EPA Process Design Manual for Land Treatment of Municipal Wastewater Effluents (EPA 2006).
5. GEOTECHNICAL CONSIDERATIONS AND PRELIMINARY RECOMMENDATIONS Yeh met with the City, Carollo and GSI Water on March 20, 2024, to discuss findings of our preliminary data review and research. Improving the percolation performance of the ponds to meet new plant demands for the City will need to address several factors including effluent quality, operational activities, and capital investment. The following considerations and recommendations should be included in continued plant operations and budgets by the City to improve and maintain percolation pond performance. The City is working with Carollo and GSI Water to estimate the overall percolation capacity and future expansion for the plant and disposal quantities. • Update the operations and maintenance manual (City 2024c) for the plant to include removal of the upper 2 to 4 inches of soil including the organic layer that forms after they are dried. • Perform deep ripping of the bottom of the ponds after the organic scum layer has been removed each time the ponds are dried.
• Plan and budget for phased removal of clayey and silty soil present within the upper 5 to 10 feet of ponds. Prior removal and replacement of clayey and silty soil from the upper 5 feet of Ponds 1, 2, 3, and 5 with well drained sand in 2012 did improve the percolation performance according to Plant staff. A phased approach would allow for the City to obtain data and evaluate the performance of the clay and silt removal program. Documentation, sampling, and testing of the soil from the pre- and post-removal process should be performed to allow the operative percolation rates being achieved to be estimated and whether percolation goals are being met. Cost estimates for the budget are displayed in Table 4 below. The following assumptions should be considered for this table:
a. Water will be provided to the contractor for the plant. b. Laydown and decanting/sludge pond area will be required c. Sludge/fines can be disposed of on-site and no offsite hauling is anticipated d. Prevailing wager
e. Estimated costs are for budgeting purposes only
f. Plant staff will have pond(s) dries out so that equipment can traverse bottom of ponds Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 18 g. Mobilization/Demobilization/Set up of plant estimated at $200,000 Table 4: Cost Estimates
Pond ID
Approximate
Pond
Construction
Timeframe
(according to
aerial
imagery –
See Appendix
C)
Estimated
Percolatio
n rate in
2023 (City
of Santa
Maria)
In/day
Pond
Area,
Empty
(acres)
Pond
Area,
Empty
(ft2)
Excavation
Removal
of 5 feet,
Volume
(yds3)
Days for
Processing
(1,200
yds/day)
Processing/
transport
Estimate,
not including
Mob
Cost per
Yard (not
including
Mob)
Total
Estimate Per
Pond
including
Mob for 1
pond
1 1960 - 1967 5-8 in/day 6.3 274428 50820 43 $1,626,240 $32 $1,826,240 2 1978 - 1981 5-7 in/day 7.2 313632 58080 49 $1,858,560 $32 $2,058,560 3 1960 - 1967 5-7 in/day 3 130680 24200 21 $774,400 $32 $974,400 4 1978 - 1981 2-4 in/day 4.4 191664 35493 30 $1,135,787 $32 $1,335,787 5 1960 - 1967 5-6 in/day 6.2 270072 50013 42 $1,600,427 $32 $1,800,427 6 1978 - 1981 2-4 in/day 6.6 287496 53240 45 $1,703,680 $32 $1,903,680 7 1960 - 1967 2-4 in/day 1.5 65340 12100 11 $387,200 $32 $587,200 8 1978 - 1981 2-4 in/day 2.9 126324 23393 20 $748,587 $32 $948,587 11 1994 - 2002 3-5 in/day 6.2 270072 50013 42 $1,600,427 $32 $1,800,427 12 1994 - 2002 4-5 in/day 5.9 257004 47593 40 $1,522,987 $32 $1,722,987 13 1994 - 2002 3-4 in/day 6.7 291852 54047 46 $1,729,493 $32 $1,929,493 14 1994 - 2002 2-4 in/day 6.3 274428 50820 43 $1,626,240 $32 $1,826,240 15 1994 - 2002 3-5 in/day 5.3 230868 42753 36 $1,368,107 $32 $1,568,107 DKC 1994 - 2002 4-6 in/day 6 261360 48400 41 $1,548,800 $32 $1,748,800 Wash
Pond A 2009-2012 2-3 in/day 1 43560 8067 7 $258,133 $32 $458,133 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 19 • Reduce the TSS of effluent. The level of TSS within the effluent has impacted the percolation performance of the ponds. Research by Rice (1974) suggests that reducing the TSS to less than about 5 milligram per liter improved the infiltration capability of ponds. TSS and percolation rates should be monitored so that site-specific correlations between TSS and percolation can be assessed and a goal for selecting a threshold for TSS that will allow for average percolation rates to be achieved.
• Transfer remaining water left in ponds at end of percolation period to a settling pond or back to the plant to lower the TSS instead of transferring to an adjacent percolation pond. • Improving percolation of deeper layers may or may not be warranted. Dry wells, air blasting to increase permeability, injection wells or other measures can be evaluated further after shallow rehabilitation methods have been completed and quantified. The number of dry wells would likely need to cover approximately 25 to 50 percent of the bottom of the ponds for there to be improvement to percolation. Drywells also make maintenance more difficult because they need to remain exposed to the effluent water and should not be covered with soil.
6. RECOMMENDATIONS FOR FURTHER STUDY
In planning the expansion of the percolation capacity of the treatment plant, the City is considering construction of additional ponds on City owned land located east of Black Road. Two cross sections have been developed for this
area based on the available
geotechnical data. These
sections are shown on Plates 13
and 14. A plan view of the area
with the preliminary locations of
the proposed ponds is shown on
Figure 11. These areas have
been preliminarily selected
because they are assumed to
have the most favorable
percolation rates. If the city
decides to move forward with
the construction of these
additional ponds, it is
recommended that additional
Figure 11: Proposed Pond Locations – East of Black Road
BLACK ROAD
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 20 exploratory borings and CPTs be performed to confirm the current conditions of the soil and to allow design criteria for the new ponds to be developed.
7. LIMITATIONS
This study has been conducted in general accordance with currently accepted geotechnical practices in this area for use by the client for preliminary design and conceptual planning purposes. The data in this report is based upon the data obtained from subsurface exploration and our understanding of the proposed project. If there are any changes in the project or site conditions, Yeh should review those changes and provide additional recommendations if needed. Any modifications to the recommendations of this report or approval of changes made to the project should not be considered valid unless they are made in writing. The report and drawings contained in this report are intended for preliminary design for input and evaluation of the percolation characteristics of the ponds by others and are not intended to act as a design-level geotechnical report, construction drawings, or specifications.
Site conditions will vary between points of observation or sampling, seasonally, and with time. The nature and extent of subsurface variations across the site may not become evident until excavation is performed. If during construction fill, soil, or water conditions appear to be different from those described herein, Yeh should be advised and provided the opportunity to evaluate those conditions and provide additional recommendations, if necessary. The geotechnical professional should observe portions of the construction and site conditions, such as excavations, exposed subgrades, and earthwork, to evaluate whether the conditions encountered are consistent with those assumed for design, and to provide additional recommendations during construction if needed.
8. REFERENCES
Casagrande, A., and Fadum, R. E. (1940). ‘‘Notes on soil testing for engineering purposes.’’ Publication 268, Graduate School of Engineering, Harvard University, Cambridge, Mass.
City of Santa Maria (City 2024a), Santa Maria WWTP – 2023 Annual Report, WDR 100029526, February 28, 2024.
City of Santa Maria (City 2024b), Perc Ponds Topographic Survey Master v2_, Civil3D.
City of Santa Maria (City 2024c), Operations and Maintenance Manual, WDR 100029526, June 2024.
Dibblee, Thomas W. (Dibblee 1994), Geologic Map of the Santa Maria and Twitchell Dam Quadrangles, California.
Earth Systems Pacific (ESP 2003), Soils Engineering Report – Santa Maria Wastewater Treatment Plant Percolation Pond Expansion East of Stowell and Black Roads, Santa Maria, California, SL-13805-SA dated September 19, 2003.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 21 Environmental Data Resources (EDR 2024), The EDR Aerial Photo Decade Package, Inquiry Number:
7536673.1, dated January 9, 2024
Environmental Protection Agency (EPA 2006), Process Design Manual for Land Treatment of Municipal Wastewater Effluents, EPA/625/R-06/016, September 2006 Fugro West, Inc. (Fugro 2006), Geotechnical Report, Santa Maria Wastewater Treatment Plant Upgrades – Phase II, Project No. 3045.053, dated 2006.
Fugro West, Inc. (Fugro 2008a), Geotechnical Report – Santa Maria Wastewater Treatment Plant Percolation Pond No. 1 Rehabilitation, Santa Maria, California, Project No. 3019.008, Dated September 18, 2008.
Fugro West, Inc. (Fugro 2008b), Percolation Pond Lithology and Materials Assessment, dated February 2008.
Fugro Consultants, Inc. (Fugro 2011), Geotechnical Report – Santa Maria Wastewater Treatment Plant Percolation Ponds Nos. 3 and 4 Characterization, Santa Maria, California, dated August 2, 2011.
Rice, R.C., (Rice 1974) “Soil Clogging during Infiltration of Secondary Effluent” Journal of Water Pollution Control Federation, Vol. 46, No. 4.
Tennyson, M.E. (Tennyson 1992), Preliminary Geologic Map of Santa Maria 30’ x 60’ Quadrangle, California.
Vandevivere, P., and Baveye, P. (Vandevivere and Baveye 1992). “Saturated hydraulic conductivity reduction caused by aerobic bacteria in sand columns.” Soil Science Society of America Journal, 56(1), pp. 1–13.
Wallace Group (2011), Technical Memorandum on Percolation Pond Performance and Sustainable Operations, City of Santa Maria WWTP, dated December 9, 2011.
Yeh and Associates, Inc. (Yeh 2024), Geotechnical Memorandum – City of Santa Maria – Wastewater Treatment Plant – Percolation Pond Study, Black Road, Santa Maria, California, dated March 12, 2024.
Yeh and Associates, Inc. (Yeh 2018), Geotechnical Report – Santa Maria Wastewater Treatment Plant, 601 S. Black Road, Santa Maria, California, dated August 10, 2018.
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
1 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 02/28/2025
0 400
feet
North
LEGEND:
Base Map: Google Earth (2022)
1 inch = 400 feet
Subsurface Profile (See plates 8 to 12)
Yeh and Associates, 2018: Sixteen Test Pits to depths of 7 to 12 feet. Encountered clay layer at depths of 3.5 to 9.5 feet.
Fugro, 2008: Three Studies: February 2008: Lithology Study: Hand Augers in Ponds 1, 2, and 7. Two in Pond 1, and one in ponds 2 and 7 to 10.25 Ō. June 2008: Hydrogeologicy Study for WWTP: Study of exisƟng groundwater monitoring of region. Not pond specific September 2008: Rehab Study: 16 test pits in Pond 1 up to 15 feet deep. Clay found from 5 to 7.5 feet below the ground surface.
Monitoring Well (exisƟng)
Agricultural Well (exisƟng)
RehabilitaƟon Dates/Notes 1. Ponds 1 through 3 Rehabilitated in 2001 per Wallace Memo (2011)2. Upper 4 to 5 feet of Pond 1, 2, 3, and 4 screened in 2012.3. Ponds 1, 2, 3, and 5 Rehabilitated in 2011-2013.3. Western half of Pond 12 Rehabilitated in 2018.4. Pond labels per Geosyntec Report (August 5, 2022)5. See Plates 2 to 5 for Historical ExploraƟon LocaƟons and Labels per this study KC Geotechnical Boring (1995) Fugro Boring (1995)
Fugro Boring (2006)Fugro Test Pit (2008)
Yeh Test Pit (2018)Earth Systems Pacific Boring (2003)Fugro Test Pit (2011) Yeh Test Pit locaƟon (current study)Yeh CPT LocaƟon (current study) Notes: LocaƟons of Test pits, CPT, and Borings are approximateSee Plates 2 to 5 for exploraƟon locaƟon labels for the current study Yeh Boring LocaƟon (current study)
RAY ROAD
Pond 1
Pond 2
Pond Expansion Study
ESP, 2003
Prelim Design Plans
Dudek, 2015
Pond 3
Pond 4
Pond 6
Pond 8
Pond 7
Pond 11
Pond 15
Pond 14
Pond 13
Pond 12
Plate 3
Plate 4
Plate 2
Plate 5
Wash Pond A
DKC Pond
Pond 5
BLACK ROAD E’ E
D’
D
C’
C
B’
B
A’
A
Old Label: Pond 7
(prior to spliƫng)
Now DKC and Wash Pond A
DMW-1
DMW-2
UMW-1
KC 1
KC 2
KC 6
KC 5
KC 4
KC3
ESP 5
ESP 6
F1
F2F3F16
F15
F14F13F12F4
F5
F6F7
F8
F9
F10F11
T1T2T3T4
T13
T14T15
T5
T12
T16
T7
T6
F4
F8
F5
F2
F1
F6
F7
F3
F5
F1
F2
F4
F3
T8
T11T10
T9
F3L2 F3-2
F3-4
F3-3
F3-5
F3L1
F3-1
F3-6
F4-1 F4-7
F4-6 F4L1
F4-5
F4-3
F4-2
A A’
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
0 500
feet
North
LEGEND:
Base Map: Google Earth (2022)
Pond 6
Pond 4
Pond 2
2 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 11/14/2024
Earth Systems Pacific Boring (2003)Yeh CPT LocaƟon (current study)Pond Expansion Study (ESP, 2003)Preliminary Design Plans (Dudek, 2015)
BLACK ROAD
STOWELL ROAD
SANTA MARIA WWTP
Subsurface Profiles (See Plates 13 and 14)
24CPT-28
ESP 1
ESP 5
ESP 6 24CPT-26
24CPT-27
24CPT-29 24CPT-30
ESP 7
ESP 4
ESP 3
ESP 2
Note: LocaƟons of test pits, CPT, and Borings are approximate F
F’
G’
G
PLATE PROJECT NAME:
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
POND 5
POND 7
POND 3
POND 8
POND 6
POND 4
POND 1
POND 2
3 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 08/27/2024
0 200
feet
North
LEGEND:
Monitoring Well (exisƟng)
Fugro Boring (1995) KC Geotechnical Boring (1995)Fugro Boring (2006)Fugro Test Pit (2008) Base Map: Google Earth (2022)
Fugro Test Pit (2011) Yeh CPT LocaƟon (current study)
Yeh Test Pit LocaƟon (current study)
Subsurface Profile Yeh Boring LocaƟon (current study)
A A’
F3 F6
F7
F1
F2
F4
F8
F5
F5
F1
F3
F4
F2
KC1
KC2
F1
F2
F3
F16
F12
F13F14F15
F4
F5F6F7F8F9F10F11
DMW-2
DMW-1
UMW-1
F4-2
F4-1
F4-7
F4-6
F4L1
F4-5
F4-3
F3-6
F3-1
F3L1 F3-5
F3-3
F3-4
F3-2
F3L2
24TP6-1 24TP6-6
24TP6-7 24TP4-1
24TP4-3
24TP4-4
24TP4-5
24TP4-7
24TP4-6
24TP4-2
24TP6-8
24TP6-9
24TP6-5
24TP6-4
24TP6-2
24TP6-3
24TP8-224TP8-3
24TP8-1
24TP2-2
24TP2-3
24TP2-8 24TP2-1
24TP2-7
24TP2-4
24TP2-6
24TP2-5
24CPT-12
24CPT-15
24CPT-16
24CPT-17
24CPT-18
24CPT-19
24CPT-20
24CPT-21
24CPT-22
24CPT-23
24CPT-24
24CPT-25
Note: LocaƟons of test pits, CPT, and borings are appproximate 24E6-1
24E6-2
24E6-3
24E6-5 24E6-4
24E4-1
24E4-2
24E4-3
24E4-4
C
E’ E
B’
D
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
POND 5 POND 7
POND 3
DKC POND
POND 1
WASH POND A
4 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 08/27/2024
0 160
feet
North
LEGEND:
Monitoring Well (exisƟng)
KC Geotechnical Boring (1995)
Fugro Test Pit (2008)
Base Map: Google Earth (2022)
Fugro Test Pit (2011)
Yeh CPT LocaƟon (current study)
A A’
Subsurface Profile
Note: LocaƟons of test pits, CPT, and borings are approximate KC2
F1
F2
F3
F16
F12
F13F14F15
F4
F5F6F7F8F9F10
F11
KC1
KC4
KC5
KC6
DMW-1
KC3
F3L2
F3-2
F3-4
F3-3
F3-5
F3L1
F3-1
F3-6
24CPT-16
24CPT-15
24CPT-12
B’
D’
C’
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
POND 15
POND 13
POND 12
POND 11
POND 14
5 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
0 160
feet
North
LEGEND:
Monitoring Well (exisƟng)KC Geotechnical Boring (1995)
Yeh Test Pit (2018)
Base Map: Google Earth (2022)
RAY ROAD
Yeh Test Pit LocaƟon (current study)Yeh CPT LocaƟon (current study)Yeh Boring LocaƟon (current study) A A’
Subsurface Profile
24E14-01
KC4
KC3
DMW-1
T1
T2
T3
T4
T13T14
T15
T5
T12
T16T7
T6
T11T10
T9
T8
24CPT-12
24CPT-01
24CPT-02
24CPT-03
24CPT-04
24CPT-05 24CPT-06 24CPT-07
24CPT-08
24CPT-09
24CPT-10
24CPT-13
24CPT-11
24CPT-14
Note: LocaƟons of test pits, CPT, and borings are approximate 24TP14-12
24TP11-3
24TP11-5
24TP11-5
24TP11-2
24TP11-1
24TP14-04
24TP14-14
24TP14-02
24TP14-08
24TP14-05 24TP14-09 24TP14-13
24TP14-07
24TP14-10
24TP14-03
24TP14-01
24TP14-06
24TP14-11
24E14-02
24E14-03
24E14-04
B
A’
A
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
PLANT TIMELINE
Geotechnical • Geological • Construction Services
6 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 02/28/2025
First set of 10 ponds
constructed for
plant expansion
ESP Report
(Pond expansion)
Fugro Report
(Pond 1 Rehab)
Fugro Report
(Pond 3/4 Expansion)
Yeh Report
(Pond 12)
Fugro Report
(Plant Expansion)
Plant Expansion
to 8 MGD
(Pond 7) added
PercolaƟon Pond
Study IniƟated
5 new ponds
constructed for
effluent disposal
1961-1967
Treatment plant first constructed.Spray fields used for effluent disposal 1938-1949
1996
2001-2006 2011
2008
2006
2003
2018
El nino
1983
El nino
1995
El nino
1998
Rehab of Western
half of Pond 12
2012 2018
Wet Winter
2017
Geotechnical
Studies
(Fugro)
1995
DWR Report
(Plant)
1961
Drought
2012-2016
Wet Winter
2023
June
2023
Rehab of Ponds 1, 2, 3
using Sand/Clay separator
2001
Rehab of
Ponds
1, 2, and 3
Plant
Expansion
2007-2009
1981
Pond consolidaƟon and
addiƟon of 4 ponds.
Ponds 1 to 8. 16 ponds
constructed in west
porƟon of site
2002
8 of 16 ponds
constructed in
west porƟon of
site repurposed for
compost facility
2019
Rehab: 4 30-inch
diameter holes
drilled in north
area of Pond 6 and
backfilled with sand
Two ponds removed
to expand compost
facility. 15 ponds
total remain
2016
Note: Plant and pond construcƟon dates are esƟmated from historical aerial photos PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
POND PERFORMANCE
Geotechnical • Geological • Construction Services
7 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
0 400
feet
North
LEGEND:
Base Map: Google Earth (2022)
1 inch = 400 feet
Poor performance, pond is only reliable for wet weather storage and generally does not percolate wellMediocre performance, pond does percolate, but takes a whileMedium performance, pond can take more water than others and is generally reliable Decent performance, pond percolates and is more reliable than other less performing ponds InformaƟon from: Pond Performance ClassificaƟons are based on a quesƟonarre provided to plant staff. Russ Newman, City of Santa Maria WWTP Plant Manager, November 2023
BLACK ROAD
RAY ROAD
Pond 13
Pond 11
Pond 14 Pond 12
Pond 15
Pond 8
Pond 6
Pond 4
Pond 2
Pond 1
Wash Pond A
DKC Pond
Pond 5
Pond 7 Pond 3
5-7 in/day
5-8 in/day
5-7 in/day
2-4 in/day
2-4 in/day 2-4 in/day5-6 in/day
2-4 in/day
4-6 in/day
2-3 in/day
3-5 in/day
2-4 in/day 4-5 in/day
3-4 in/day
3-5 in/day
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
8 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE A-A’
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
LEGEND:
Af ArƟficial Fill:
SAND and silty SANDPerched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy)Geologic contact, queried where uncertain ?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Qa
Ground Surface
Qa Qa
Qa
Qa
Pond 13 Pond 14 Pond 15
?
?
?
?
Af
IntersecƟon with
B-B’
?
?
?
?
? ? ? ? ? ? ?
?
?
?
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 100 Ō. horizontal
170150
130
110
0 200 400 600 800 1000
170150130
110
9070
ELEVATION (FEET)
ELEVATION (FEET)
A
South
A’
North
90 70
1200 1400
OFFSET (FEET)
Af
24TP14-08
Rt. 0’
TD = 10’
SC
SP-SC
SW-SM
SW
24TP14-07
Lt. 12’
TD = 10’
SP
CL-ML
SW
24TP14-06
Lt. 32’
TD = 10’
SC
SW
CL
SP
24CPT-13 148'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 102.7'
100 200 300 400 500
30' LT.
24CPT-08 148.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 102.9'
100 200 300 400
15' RT.
24CPT-04 148.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 88.0'
100 200 300 400
15' RT.
Af
24CPT-01 150.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 114.2'
100 200 300
30' LT.
24E14-01
Rt. 0’
TD = 34.5’
SP
CLSC
SM
CL
SC
TD = 10’
SP
CH
SP
24TP14-05
Lt. 48’
Af
24E14-02
Rt. 80’
TD = 31.5’
SP
SC
CL
24E14-03
Lt. 434’
TD = 31.5’
SC-SM
CLCLSPCLSP
SPSP
SP-SC
SP-SC
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
9 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE B-B’
LEGEND:
Af ArƟficial Fill:
SAND and silty SAND
Geologic contact, queried where uncertain
?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvium:SAND with disconƟnuous interbedded layers of silt and clay
HOLE I.D. LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Perched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Ground Surface
?
?? ? ?
Qa
Af
Af
Af Af Af
Af
?
? ? ? ?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
Qa
Qa
Qa Qa
1 in. = 25 Ō. verƟcal
PROFILE
1 in. = 250 Ō. horizontal
Pond 14 Pond 12 Pond 5 Pond 3 Pond 1
IntersecƟon with
A-A’
IntersecƟon with
D-D’ IntersecƟon with C-C’
200175
150
125
0 500 1000 1500 2000 2500
20017515012510075
ELEVATION (FEET)
ELEVATION (FEET)
B
West
B’
East
100
75 3000 3500
OFFSET (FEET)
Fugro 2011
TP-3L2
Rt. 5.5’
TD = 14’
SP-SM
Fugro 2008
T-11
Lt. 20’
TD = 6’
ML
CH
SP-SM
Fugro 2011
TP-3-2
Rt. 72’
TD = 14’
SP
CL
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
24CPT-02 148'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 102.9'
100 200 300 400
115' LT.
24CPT-04
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 88.0'
100 200 300 400
148'
20' LT.
24CPT-06 150'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 119.8'
100 200 300 400
35' RT.
24CPT-09 148.5'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 103.2'
100 200 300 400
135' RT.
24CPT-12 151'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 109.7'
100 200 300 400
75' RT.
24CPT-15 155'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 94.8'
100 200 300 400
35' RT.
6 24CPT-16 156.0'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 100.2'
100 200 300 400
90' RT.
6 24E14-01
Lt. 80’
TD = 34.5’
SP
CL
SC
CL
SM
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
10 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE C-C’
LEGEND:
Af
ArƟficial Fill: Medium dense Clayey SAND (SM) with GRAVEL Geologic contact, queried where uncertain
? See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Perched Water or seepage encounteredduring drilling/exploraƟon ALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Af
Ground Surface
Qa
?
?
?
?
?
? ?
?
? ?
? ?
?
?
?
?
?
?
?
Qa
Qa
Qa
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 200 Ō. horizontal
IntersecƟon with
B-B’
IntersecƟon with
E-E’ 180
160
140
120
0 400 800 1200 1600 2000
18016014012010070
ELEVATION (FEET)
ELEVATION (FEET)
C
South
C’
North
100
80 2400
OFFSET (FEET)
60 80
2500
24CPT-07 151.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 115.9'
100 200 300
35' LT.
24CPT-12 151.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 109.7'
100 200 300 400
30' RT.
24CPT-17 156.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 110.9'
100 200 300 400 500
30' RT.
24CPT-20 157.5'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 127.3'
100 200 300 400 500
30' RT.
24CPT-23 157.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 92.2'
100 200 300 400 500
0' RT.
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
11 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE D-D’
BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACEFIELD N-VALUE IN BLOWS PER FOOTLITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLORED2” OD SPT SAMPLER
BORING DIAGRAM
2.5” OD MODIFED CALIFORNIA SAMPLER
24X-01
RT. 20’
TD = 30.5’
24 61
GCCLMH
MHMHMHMHMH
72 50/6
82 SHELBY TUBE SAMPLER
LEGEND:
Af
ArƟficial Fill: Medium dense Clayey SAND (SM) with GRAVEL Geologic contact, queried where uncertain
?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay Perched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Af
Qa
Ground Surface
Qa
Qa
IntersecƟon with
E-E’
IntersecƟon with
B-B’
?
?
?
?
?
?
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 200 Ō. horizontal
170150
130
110
0 400 800 1200 1600 2000
1701501301109070
ELEVATION (FEET)
ELEVATION (FEET)
D
South
D’
North
90 70
2400
OFFSET (FEET)
155.0'
0' RT.
24CPT-18
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 124'
100 200 300 400
24CPT-15 155.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 94.8'
100 200 300 400
0' RT.
24CPT-24 154.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 114.0'
100 200 300 400
20' LT.
24E6-03
Lt. 80’
TD = 31.5’
SW
CL
SW
24CPT-21 155.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 124.8'
100 200 300 400
0' RT.
? ?
?
?
?
? ?
?
?
? ?
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
12 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE E-E’
LEGEND:
Af
ArƟficial Fill: SAND and silty SAND`
Geologic contact, queried where uncertain
?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvium:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE Perched Water or seepage encountered
during drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Ground Surface
Qa?
?
?
?
Af Af
Af
Af
1 in. = 10 Ō. verƟcal
PROFILE
1 in. = 125 Ō. horizontal
Pond 8 Pond 6 Pond 4 Pond 2
IntersecƟon with
C-C’ 170
160
150
140
0 250 500 750 1000 1250
170160150140130120
ELEVATION (FEET)
ELEVATION (FEET)
E
West
E’
East
130
120
1500 1750
OFFSET (FEET)
110 110
105 105
IntersecƟon with
D-D’
24TP2-02
TD = 12’
SP-SM
SP
SW
24CPT-20 157.5'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 127.3'
100 200 300 400 500
24CPT-22 156.0'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-21-24
Terminated at Elev 125.8'
100 200 300 400
24TP2-07
TD = 10’
SP
24TP2-06
TD = 10’
SPSP
SW
Fugro 2011
TP 4-6
TD = 13’
SM
ML
CL
SP-SM
24E6-01
Rt. 40’
TD = 31.5’
SP-SC
SP
ML/CL
SP
SP-SM
24E6-03
Rt. 80’
TD = 31.5’
SW
CL
SW
24TP6-02
TD = 4.5’
SP-SM
CL-ML
SP
24TP6-05
TD = 10’
SP
CL-ML
SW
24TP6-08
TD = 11’
SP-SMSP-SM
CL-ML
24CPT-21 155.0'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 124.9'
100 200 300 400
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
13 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 03/21/2025
SUBSURFACE PROFILE F-F’
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
LEGEND:
Af ArƟficial Fill:
SAND and silty SANDPerched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy)Geologic contact, queried where uncertain ?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Ground Surface
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 200 Ō. horizontal
IntersecƟon with
G-G’
180160
140
120
0 400 800 1200 1600 2000
180160140
120
10080
ELEVATION (FEET)
ELEVATION (FEET)
F
West
F’
East
100
90 2400 2800
OFFSET (FEET)
Black Rd
161.0'
24CPT-27
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-21-24
Terminated at Elev 133.8'
100 200 300
RT 0'
174.0'
24CPT-28
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 143.7'
100 200 300
RT 20' ESP-5 Lt. 60’
TD = 51.5’
SP
ML
SP
ML
SP
ML
Water Disposal Area
(Off Site Source)
171.0'
24CPT-26
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 140.8'
100 200 300
ESP-6 LT 735'
Lt. 710’
TD = 51.5’
SP
ESP-1
Lt. 625’
TD = 51.5’
SCSP
SW
SP
ML
SP-SM
Proposed Future Ponds
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
14 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 03/21/2025
SUBSURFACE PROFILE G-G’
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
LEGEND:
Af ArƟficial Fill:
SAND and silty SANDPerched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy)Geologic contact, queried where uncertain ?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Ground Surface
IntersecƟon with
F-F’
1 in. = 25 Ō. verƟcal
PROFILE
1 in. = 250 Ō. horizontal
Proposed Future Ponds
175150
125
100
0 500 1000 1500 2000 2500
175150125
100
7550
ELEVATION (FEET)
ELEVATION (FEET)
G
South
G’
North
75 50
3000 3500
OFFSET (FEET)
164.0' LT 1030'
24CPT-29
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 134.0'
100 200 300 400
171.0'
24CPT-26
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 140.8'
100 200 300
171.0'
24CPT-30
8 6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 109.0'
100 200 300 400
RT 1050'
ESP-4
Lt. 60’
TD = 51.5’
MLML
SP
ML
SP
SP
ESP-5
Lt. 95’
TD = 51.5’
SP
ML
SP
ML
SP
ML
ESP-7
Lt. 50’
TD = 60’
SP
ML
SP
SC
SP
SW
SP
SW
SP
ML
SP
APPENDIX A - BORING LOGS, TEST PIT LOGS, AND CPT PLOTS
DATE
7/16/2024
PROJECT NAME
Santa Maria WWTP
SILTY, CLAYEY SAND
Group Names
SC-SM
Graphic / Symbol Graphic / Symbol Group Names
Standard California Sampler (2.5" O.D.)
C
GRAVELLY ORGANIC SILT GRAVELLY ORGANIC SILT with SAND
ORGANIC SILT
SANDY ORGANIC fat CLAY
Elastic SILT with SAND
Well-graded GRAVEL Compaction Curve (ASTM D1557)
Corrosion, Sulfates, Chlorides (CTM 643; ASTM D4972,
ASTM G187, ASTM D4327)
-200 200 Wash (ASTM D1140)
VS Vane Shear (AASHTO T 223-96 [2004])
UW Unit Weight (ASTM D4767, ASTM D7263)
UU Unconsolidated Undrained Triaxial
(ASTM D2850)
UC Unconfined Compression - Soil (ASTM D2166)
Unconfined Compression - Rock (ASTM D7012)
TV
Poorly graded GRAVEL with SILT
GRAVELLY lean CLAY with SAND
SP-SC
SW
SP
Piston Sampler
SW-SM
SILTY, CLAYEY GRAVEL with SAND
CLAYEY GRAVEL with SAND
SILTY GRAVEL with SAND
Modified California Sampler (3" O.D.)
GRAVELLY SILT with SAND
SILT
ORGANIC SILT with SAND ORGANIC SILT with GRAVEL
Consolidation (ASTM D2435)
Standard Penetration Test (SPT) (2" O.D.)
OL
SC
GW
Well-graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
CR
Pocket Torvane
SW Swell Potential (ASTM D4546)
SILTY, CLAYEY SAND with GRAVEL
CLAYEY SAND with GRAVEL
SILTY SAND with GRAVEL
GROUP SYMBOLS AND NAMES
DRILLING METHOD SYMBOLS
OL
GC
GP
GC-GM
SANDY ORGANIC SILT
Lean CLAY with SAND
Lean CLAY with GRAVEL
SANDY lean CLAY with GRAVEL
ORGANIC lean CLAY
GRAVELLY ORGANIC lean CLAY GRAVELLY ORGANIC lean CLAY with SAND Fat CLAY
Elastic SILT with GRAVEL SANDY elastic SILT SANDY elastic SILT with GRAVEL GRAVELLY elastic SILT GRAVELLY elastic SILT with SAND ORGANIC elastic SILT
SANDY ORGANIC SILT with GRAVEL
CH
SE
MH
OH
OL/OH
Rock Core Grab Sample
Poorly graded SAND with SILT and GRAVEL
SANDY lean CLAY
GRAVELLY lean CLAY
ORGANIC lean CLAY with SAND ORGANIC lean CLAY with GRAVEL SANDY ORGANIC lean CLAY SANDY ORGANIC lean CLAY with GRAVEL
Fat CLAY with SAND
Fat CLAY with GRAVEL SANDY fat CLAY
Sand Equivalent (CTM 217)
SANDY fat CLAY with GRAVEL GRAVELLY fat CLAY GRAVELLY fat CLAY with SAND ORGANIC fat CLAY ORGANIC fat CLAY with SAND ORGANIC fat CLAY with GRAVEL GW-GM
CL
CL-ML
ML
COBBLES and BOULDERS
BOULDERS
PT
SILTY GRAVEL
CLAYEY GRAVEL
SILTY, CLAYEY GRAVEL
SILTY SAND
CLAYEY SAND
SILTY CLAY
SILTY CLAY with SAND
SILTY CLAY with GRAVEL SANDY SILTY CLAY
SANDY SILTY CLAY with GRAVEL GRAVELLY SILTY CLAY GRAVELLY SILTY CLAY with SAND SILT with SAND
SILT with GRAVEL SANDY SILT SANDY SILT with GRAVEL
SANDY ORGANIC fat CLAY with GRAVEL GRAVELLY ORGANIC fat CLAY GRAVELLY ORGANIC fat CLAY with SAND Elastic SILT
ORGANIC elastic SILT with GRAVEL SANDY elastic ELASTIC SILT
COBBLES
Well-graded GRAVEL with SAND
Well-graded GRAVEL with SILT
Well-graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Well-graded SAND with CLAY (or SILTY CLAY)
Poorly graded GRAVEL
Poorly graded GRAVEL with CLAY
(or SILTY CLAY)
Poorly graded SAND with SILT
Poorly graded SAND with CLAY (or SILTY CLAY)
Poorly graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
Lean CLAY
ORGANIC elastic SILT with SAND
SANDY ORGANIC elastic SILT with GRAVEL GRAVELLY ORGANIC elastic SILT GRAVELLY ORGANIC elastic SILT with SAND GW-GC
GP-GM
GP-GC
GM
Well-graded SAND with SILT
SW-SC
SP-SM
GRAVELLY SILT
ORGANIC SOIL ORGANIC SOIL with SAND ORGANIC SOIL with GRAVEL SANDY ORGANIC SOIL SANDY ORGANIC SOIL with GRAVEL GRAVELLY ORGANIC SOIL GRAVELLY ORGANIC SOIL with SAND OH
SM
Auger Drilling
FIELD AND LABORATORY TESTS
WATER LEVEL SYMBOLS
Dynamic Cone
or Hand Driven Rotary Drilling Diamond Core
Static Water Level Reading (long-term)
Bulk Sample Other (see remarks)
Static Water Level Reading (short-term)
First Water Level Reading (during drilling)
SHEET
1 of 1
SAMPLER GRAPHIC SYMBOLS
PEAT
Well-graded GRAVEL with SILT and SAND
Well-graded GRAVEL with CLAY (or SILTY CLAY)
Well-graded SAND
Well-graded SAND with GRAVEL
Well-graded SAND with SILT and GRAVEL
Poorly graded GRAVEL with SAND
Poorly graded GRAVEL with SILT and SAND
Poorly graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Poorly graded SAND
Poorly graded SAND with GRAVEL
RS Torsional Ring Shear (ASTM D6467)
R R-Value (CTM 301)
REPORT TITLE
LEGEND FOR SOIL CLASSIFICATION
Thin-Walled Tube
CP
PP Pocket Penetrometer
PL Point Load Index (ASTM D5731)
Liquid Limit, Plastic Limit, Plasticity Index
(ASTM D4318)
PI
PA Particle Size Analysis (ASTM D422-63 [2007])
P Permeability (ASTM 5084)
M Moisture Content (ASTM D2216)
EI Expansion Index (ASTM D4829)
DS Direct Shear (ASTM D3080)
CU Consolidated Undrained Triaxial (ASTM D4767)
A1 of 103
-200 (0% G, 73% S, 27% F)
P
19 87 0.8PP
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; (ALLUVIUM).
Poorly graded SAND (SP); loose; black; moist.
Medium dense.
Medium to coarse GRAVEL.
Few subrounded GRAVEL.
CLAYEY SAND (SC); medium dense; brown; wet.
Lean CLAY (CL); medium stiff; brown; moist.
SILT (ML); medium stiff; brown; moist.
R1
R2
55 R3
56 R4
57 R5
58 60
50 32
89 23
89 23
83 80
94 2
5 5
5 8
11 9
18 20
7 8
10 BORING NUMBER
24E4-01
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, clear
SURFACE ELEVATION
145.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
NW Corner of Pond 4
ELEVATION (ft)
143
141
139
137
135
133
131
129
127
125
123
121
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 19
38 18
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A2 of 103
PA (0% G, 93% S, 7% F)
-200 (0% G, 95% S, 5% F)
P
11 101
Poorly graded SAND with SILT (SP-SM); medium
dense; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
59 61
30 89
83 11
18 22
9 17
23 ELEVATION (ft)
119
117
115
113
111
109
107
105
103
101
99 97
95 93
91 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 40 40
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A3 of 103
PA (1% G, 94% S, 5% F)
Poorly graded SAND with GRAVEL (SP); loose; brown;
moist; (ALLUVIUM).
Poorly graded SAND with SILT (SP-SM); loose; olive
brown; moist; medium to coarse SAND.
Medium dense; fine to medium SAND; 2" layer of SILT
(ML).
4" layer of SILT (ML).
Fine to medium SAND.
Medium to coarse SAND.
R1
R2
62 R3
63 R4
64 R5
65 33
35 89
33 100
40 100
37 89
3 7
7 3
6 7
4 6
7 5
9 13
BORING NUMBER
24E4-02
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
27.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Overcast
SURFACE ELEVATION
145.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Center of east edge of Pond 4
ELEVATION (ft)
143
141
139
137
135
133
131
129
127
125
123
121
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 14 13
13 22
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A4 of 103
Loose; wet; 6" layer of silty CLAY (CL-ML).
Poorly graded SAND with SILT (SP-SM) (continued). Medium dense.
Medium to coarse SAND.
Fine to medium SAND.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
66 67
40 83
100
6 6
2 10
15 13
ELEVATION (ft)
119
117
115
113
111
109
107
105
103
101
99 97
95 93
91 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 8 28
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A5 of 103
PA (1% G, 95% S, 4% F)
1.0PP
Poorly graded SAND (SP); loose; light brown to brown;
moist; medium to coarse SAND; (ALLUVIUM).
SILTY CLAY (CL-ML); medium stiff; brown and gray;
moist.
Poorly graded SAND (SP); loose; brown to gray; moist;
fine ro coarse SAND.
Medium dense; fine to medium SAND.
Medium to coarse SAND.
R1
R2
68 70
R3
69 R4
71 R5
72 28
43 100
23 100
33 94
33 100
1 2
2 3
5 5
3 7
8 6
9 12
BORING NUMBER
24E4-03
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
30.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Cloudy
SURFACE ELEVATION
146.0 ft
LOGGED BY
L. Salemme/ K. Ocampo
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Midle of south edge of Pond 4
ELEVATION (ft)
144
142
140
138
136
134
132
130
128
126
124
122
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 4 10
15 21
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A6 of 103
1.0PP
Poorly graded SAND (SP) (continued).
1/8" seam of lean CLAY (CL).
SANDY lean CLAY (CL); medium stiff; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
73 74
25 78
39 3
10 10
5 5
3 ELEVATION (ft)
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 20 8
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A7 of 103
0.25 - 1.0PP
Poorly graded SAND (SP); loose; brown; moist; trace
subangular to subrounded GRAVEL; medium to coarse
SAND; (ALLUVIUM).
SILTY CLAY (CL-ML); soft; gray to brown; moist.
2" layer of well-graded SAND (SW).
Poorly graded SAND (SP); medium dense; light brown;
moist; fine to medium SAND.
Light brown to gray; medium to coarse SAND.
R1
R2
75 76
R3
77 R4
78 R5
79 20
100
30 78
23 100
27 84
1 2
2 6
12 17
11 13
15 5
11 13
BORING NUMBER
24E4-04
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
22.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, warm
SURFACE ELEVATION
144.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Middle of east edge of Pond 4
ELEVATION (ft)
142
140
138
136
134
132
130
128
126
124
122
120
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 4 29
28 24
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A8 of 103
Dense; wet; trace subangular ro subrouned GRAVEL.
Poorly graded SAND (SP) (continued).
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
80 81
30 100
100
12 25
28 10
14 18
ELEVATION (ft)
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 53 32
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A9 of 103
PA (0% G, 93% S, 6% F)
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; fine to medium SAND; (ALLUVIUM).
Poorly graded SAND (SP); loose; gray; wet; medium to
coarse SAND.
3" layer of lean CLAY (CL).
Medium dense; light brown; moist.
6" layer of Silty SAND (ML).
Gray; fine to medium SAND.
Brown.
Poorly graded SAND with SILT (SP-SM); dense; brown;
moist.
R1
R2
30 R3
31 R4
32 R5
33 13
27 72
30 94
33 100
40 100
3 2
2 2
8 11
4 6
10 12
22 28
BORING NUMBER
24E6-01
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
20.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, cool
SURFACE ELEVATION
145.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Middle of west edge of Pond 6
ELEVATION (ft)
143
141
139
137
135
133
131
129
127
125
123
121
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 4 19
16 50
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A10 of 103
Very loose.
Poorly graded SAND with SILT (SP-SM) (continued). CLAYEY SILT (ML/CL).
Well-graded SAND (SW); medium dense; brown;
moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
34 35
30 100
100
7 2
3 16
20 19
ELEVATION (ft)
119
117
115
113
111
109
107
105
103
101
99 97
95 93
91 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 5 39
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A11 of 103
Poorly graded SAND (SP); medium dense; light brown;
moist; fine to medium SAND; (ALLUVIUM).
2" lean CLAY (CL).
1" layer of clayey SILT (ML/CL).
Loose.
Trace GRAVEL from 12 to 14 feet.
Medium dense.
R1
R2
36 R3
37 R4
38 R5
39 28
25 89
27 89
27 100
27 100
3 8
11 3
5 5
7 10
11 10
18 22
BORING NUMBER
24E6-02
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
29.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny, clear
SURFACE ELEVATION
146.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Southwest corner of Pond 6
ELEVATION (ft)
144
142
140
138
136
134
132
130
128
126
124
122
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 19 10
21 40
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A12 of 103
PA (18% G, 76% S, 6% F)
-200 (0% G, 45% S, 55% F)
P
<
0.25PP
13 103
Poorly graded SAND with CLAY and GRAVEL
(SP-SC); dense; light brown; moist; trace fine to
coarse, subrounded GRAVEL; fine to coarse SAND.
1" of lean CLAY.
Some subrounded to subangular GRAVEL.
SANDY lean CLAY (CL); very soft; brown; wet.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
40 41
25 100
100
11 24
23 3
4 3 ELEVATION (ft)
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 47 7
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A13 of 103
<0.5PP
Well-graded SAND (SW); loose; brown; moist; fine to
coarse SAND; (ALLUVIUM).
Lean CLAY (CL); very soft; brown; moist.
Poorly graded SAND (SP); medium dense; light brown
to gray brown; moist; fine ro coarse SAND.
1" layer of lean CLAY (CL).
With intermittent seams of lean CLAY (CL) to 1/4"
thick.
R1
R2
42 44
R3
43 R4
45 R5
--
27 70
100
100
30 100
33 89
33 0
1 1
1 6
11 14
9 14
20 7
11 14
BORING NUMBER
24E6-03
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, breezy
SURFACE ELEVATION
144.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Middle of east edge of Pond 6
ELEVATION (ft)
142
140
138
136
134
132
130
128
126
124
122
120
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 2 25
34 25
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A14 of 103
-200 (0% G, 59% S, 40% F)
P
19 100
3" layer of lean CLAY (CL).
Poorly graded SAND (SP) (continued).
SILTY SAND (SM); medium dense; light brown to gray
brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
46 47
47 83
83 10
14 23
9 13
20 ELEVATION (ft)
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 37 43
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A15 of 103
PA (0% G, 94% S, 6% F)
1.0PP
0.5PP
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; (ALLUVIUM).
Black to gray.
Lean CLAY (CL); medium stiff; brown; moist.
Poorly graded SAND (SP); loose; black; moist.
SILT (ML); soft; gray to brown; moist.
Poorly graded SAND (SP); loose; gray; moist; medium
to coarse SAND.
Medium dense; fine to medium SAND.
Medium to coarse SAND.
Poorly graded SAND with SILT (SP-SM); light brown.
R1
R2
48 50
R3
49 R4
51 R5
52 55
42 100
38 100
33 100
30 100
1 5
5 3
9 12
7 11
16 10
16 18
BORING NUMBER
24E6-04
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, warm
SURFACE ELEVATION
142.5 ft
LOGGED BY
L. Salemme/ K. Ocampo
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Northeast area of Pond 6
ELEVATION (ft)
141
139
137
135
133
131
129
127
125
123
121
119
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 21
27 34
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A16 of 103
Poorly graded SAND with SILT (SP-SM) (continued).
1" layer of SILT.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
53 54
35 89
78 9
14 21
5 7
10 ELEVATION (ft)
117
115
113
111
109
107
105
103
101
99 97
95 93
91 89
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 35 17
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A17 of 103
0.5PP
Poorly graded SAND (SP); loose; light brown; moist;
fine to medium SAND; (ALLUVIUM).
Gray brown; medium to coarse SAND.
SILTY CLAY (CL-ML); soft; brown/gray; moist.
Poorly graded SAND (SP); loose; gray brown; moist;
fine to coarse SAND.
Light brown.
Medium dense.
82 83
84 85
86 87
88 89
90 91
92 93
94 95
--
96 100
100
100
100
83 100
89 100
89 89
100
100
100
89 11
100
2 5
7 4
5 4
3 6
7 2
1 2
2 2
5 3
5 7
7 8
13 4
5 5
5 6
8 2
4 7
10 17
20 7
8 11
8 14
19 7
8 12
5 6
8 8
12 15
BORING NUMBER
24E6-05
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
24.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, breezy
SURFACE ELEVATION
142.5 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.0 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Northwest corner of Pond 6
ELEVATION (ft)
141
139
137
135
133
131
129
127
125
123
121
119
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-05
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 12 9
13 3
7 12
21 10
14 11
37 19
33 20
14 27
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A18 of 103
1" layer of gray SILT (ML).
Poorly graded SAND (SP) (continued).
4" layer of gray SILT (ML).
Bottom of borehole at 31.0 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
97 98
99 83
83 5
12 18
10 10
8 1
2 2 ELEVATION (ft)
117
115
113
111
109
107
105
103
101
99 97
95 93
91 89
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-05
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 30 18
4 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
A19 of 103
Rig chatter, material stuck in auger,
sampler twisted
PA (2% G, 81% S, 17% F)
Poorly graded SAND (SP); light brown; moist; trace
subangular GRAVEL; medium to coarse SAND;
(ALLUVIUM).
Medium dense.
Yellowish brown.
Some fine to coarse, subangular to subrounded
GRAVEL.
Some seepage.
CLAYEY SAND (SC); medium dense; light brown;
moist.
No GRAVEL.
R1
R2
1 R3
2 R4
3 R5
4 50
33 100
27 106
27 100
30 100
5 8
11 11
13 11
6 9
14 8
9 15
BORING NUMBER
24E14-01
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Partly cloudy, warm
SURFACE ELEVATION
133.5 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
34.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
North side center of Pond 14
ELEVATION (ft)
132
130
128
126
124
122
120
118
116
114
112
110
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 19 24
23 24
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A20 of 103
-200 (0% G, 39% S, 61% F)
P
24 98 0.5PP
CLAYEY SAND (SC) (continued). Lean CLAY (CL); medium stiff; brown; moist.
CLAYEY SAND (SC); loose; brown; moist.
SANDY lean CLAY (CL); soft; brown; moist.
SILTY SAND (SM); loose; brown; moist.
Bottom of borehole at 34.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
5 R7
6 7
8 9
23 89
63 100
4 6
4 4
4 8 ELEVATION (ft)
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 12
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A21 of 103
Poorly graded SAND (SP); loose; brown; moist; trace
GRAVEL; (ALLUVIUM).
2" layer of lean CLAY with SAND (CL).
Loose.
4" layer of lean CLAY with SAND (CL).
Medium dense.
Intermittent seams of well-graded SAND with CLAY
(SW-SC).
R1
R2
10 R3
11 R4
12 R5
13 53
37 100
30 100
27 100
30 100
2 3
8 6
13 18
7 8
14 5
9 10
BORING NUMBER
24E14-02
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny
SURFACE ELEVATION
134.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
South side center of Pond 14
ELEVATION (ft)
132
130
128
126
124
122
120
118
116
114
112
110
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 11 31
22 19
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A22 of 103
-200 (0% G, 97% S, 3% F)
P
Dense. 7 101
Poorly graded SAND (SP) (continued).
CLAYEY SAND (SC); medium dense; light brown to
gray; moist.
Lean CLAY (CL); medium stiff; light brown to gray;
moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
14 15
27 100
100
9 22
23 3
8 12
ELEVATION (ft)
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 46 20
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A23 of 103
PA (0% G, 94% S, 6% F)
2PP
SILTY, CLAYEY SAND (SC-SM); loose; brown; moist;
(ALLUVIUM).
Poorly graded SAND (SP); loose; brown; moist; fine to
medium GRAVEL.
Lean CLAY (CL); stiff; brown; moist.
Poorly graded SAND (SP); loose; black; moist.
Lean CLAY (CL); medium stiff; brown; moist.
Poorly graded SAND (SP); loose; brown; moist.
Poorly graded SAND with SILTY CLAY (SP-SC); loose;
brown; moist.
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; medium to coarse SAND.
R1
R2
16 R3
17A
17B
R4
18 20
R5
19 18
20 100
23 100
32 100
30 100
6 9
9 6
12 16
3 4
7 10
12 20
BORING NUMBER
24E14-03
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny
SURFACE ELEVATION
136.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Southwest corner of Pond 14
ELEVATION (ft)
134
132
130
128
126
124
122
120
118
116
114
112
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 18 28
11 32
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A24 of 103
Poorly graded SAND with CLAY (SP-SC) (continued).
3" layer of lean CLAY (CL).
Lean CLAY (CL).
Poorly graded SAND (SP); loose; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
21 22
25 100
100
7 14
18 3
6 16
ELEVATION (ft)
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 32 22
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A25 of 103
PA (0% G, 95% S, 5% F)
1.5PP
Poorly graded SAND with CLAY (SP-SC); medium
dense; brown; moist; (ALLUVIUM).
Black/gray.
Medium dense; black/gray; moist; trace fine to medium,
subangular to subrounded GRAVEL.
Gray.
Lean CLAY (CL); stiff; brown; moist; few seams of
SILT.
R1
R2
23 R3
24 R4
25 R5
26 28
43 32
100
30 100
30 100
75 100
6 13
13 4
8 10
5 11
15 10
16 22
BORING NUMBER
24E14-04
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny
SURFACE ELEVATION
133.0 ft
LOGGED BY
L. Salemme/ K. Ocampo
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
30' N of Southeast corner of Pond 14
ELEVATION (ft)
131
129
127
125
123
121
119
117
115
113
111
109
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 26 18
26 38
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A26 of 103
<
0.5PP
Lean CLAY (CL) (continued). SILTY SAND (SM); loose; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
27 29
--
60 100
0 0
4 6
6 9
11 ELEVATION (ft)
107
105
103
101
99 97
95 93
91 89
87 85
83 81
79 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 20
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A27 of 103
6,/7<6$1'
60 PHGLXPGHQVHEURZQPRLVWLURQVWDLQLQJ
$//89,80
'HQVHOD\HUHGOLJKWJUD\LVKEURZQDQGJUD\
:HOOJUDGHG6$1'
6:
GHQVHJUD\PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SM
SM
SW
0 4
8 Depth (feet)
10 A28 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEURZQPRWWOHGZLWK
EODFNPRLVWWUDFH*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 GHQVHEODFNPRLVW
:HOOJUDGHG6$1'
6:
GHQVHJUD\LVKEODFNPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI:(GJHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SW
SP-SM
SP
0 4
8 Depth (feet)
12 A29 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEURZQDQGJUD\PRLVW
ZLWK&/$<SRFNHWVXSWR
$//89,80
6,/7<&/$<(<6$1'
6&60
GHQVHEODFNPRLVW
VHDPRIOHDQ&/$<
&/
VWLIIJUD\EURZQ
*UD\PRLVW
*UD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
Seam of CL
SP-SM
SC-SM
SC-SM
SC-SM
0 4
8 Depth (feet)
11 A30 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEURZQPRWWOHGZLWK
JUHHQPRLVWUXVWVWDLQV
$//89,80
3RRUO\JUDGHG6$1'
63 GHQVHEODFNDQGJUD\PRLVW
/LJKWJUD\LVKEURZQWUDFHFRDUVH*5$9(/
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI6(GJHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
0 4
8 Depth (feet)
10 Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP
SP
SP-SM
A31 of 103
3RRUO\JUDGHG6$1'
63 ORRVH\HOORZLVKEURZQPRLVW
$//89,80
/HDQ&/$<
&/
VWLIIEURZQPRLVWWUDFH*5$9(/LQWHUEHGGHGZLWKFRDUVH
6$1'DQG*5$9(/
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEODFNDQGJUD\LVKEURZQ
*UD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
SP
CL
A32 of 103
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEURZQZLWKJUD\PRWWOLQJ
$//89,80
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\ZHWFRDUVH6$1'ZLWK
*5$9(/
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
GHQVHEURZQILQH6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21 '(6&5,37,21
&HQWHURI((GJHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP-SM
SW
A33 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPVWLIIEURZQPRLVW
$//89,80
%ODFN
%ODFNDQGJUD\OD\HUILQHU6$1'*5$9(/
'HQVHJUD\LVKEURZQ
%URZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP-SM
SP-SM
SP-SM
SP-SM
A34 of 103
6,/7<6$1'
60 PHGLXPGHQVHEURZQPRLVWWUDFH*5$9(/
$//89,80
'HQVHGDUNEURZQWROLJKWJUD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SM
SM
A35 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
GDUNJUD\PRLVWVRPH*5$9(/
$//89,80
%ODFNWRGDUNJUD\PRLVWPHGLXP6$1'
/LJKWJUD\PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
2&
3$
*6)
2&
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP-SM
SP-SM
SP-SM
0 4
8 Depth (feet)
10 A36 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHOLJKWEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEODFNWRGDUNJUD\PRLVWPHGLXP
6$1'
/LJKWJUD\
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
2&
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP-SM
SP
SP
0 4
8 Depth (feet)
10 A37 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQWRJUD\PRLVWIHZFRDUVH
*5$9(/
$//89,80
%ODFNSRFNHWVRI3RRUO\*UDGHG6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\WREODFNPRLVWPHGLXP6$1'
/LJKWJUD\WROLJKWEURZQ
6,/7<&/$<
&/0/
OLJKWJUD\WREODFNPRLVW
3RRUO\JUDGHG6$1'
63 OLJKWJUD\WREODFNPRLVWPHGLXP6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
\DUGV6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP-SM
SP
SP
CL-ML
0 4
8 Depth (feet)
10 A38 of 103
6,/7<6$1'
60 OLJKWJUD\LVKEURZQPRLVW
$//89,80
:HOOJUDGHG6$1'
6:
OLJKWJUD\LVKEURZQPRLVWPHGLXPWRFRDUVH
*5$9(/PHGLXPWRFRDUVH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVWILQHWRPHGLXP6$1'
6HHSDJH
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 OLJKWJUD\PRLVWPHGLXP6$1'
5HGGLVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
\DUGV6(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
0 4
8 Depth (feet)
10 Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SM
SW
SP
CL-ML
SP
SP
A39 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQIHZURXQGHG*5$9(/
$//89,80
&/$<(<6$1'ZLWK*5$9(/
6&
PHGLXPGHQVHURXQGHG*5$9(/
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPHGLXPWRFRDUVH6$1'
6,/7<&/$<
&/0/
UHGGLVKEURZQZLWKOHQVHVRISRRUO\JUDGHG6$1'
63 OLJKWJUD\PHGLXPJUDLQHG6$1'VHHSDJH
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
CL-ML
SC
A40 of 103
!"!#
$%"& '
#
'
$%"&#
( )( )
#
*
#
* +
,
-
#
.*
+
/#/ *
. %
'
0 +
''
'
)
1 %'2
, )
*'
,
-
3/33
4'
+
%'2
#
$%5!6&%
%&$
5$$& .(
7 .(
!%$ &8)"5
7&% &8)"5 &
&
!.&%
5%&5
.!)9& 6:
!%7)& &&"5
!
)5%)5%
"#$%&'(&(&'
&;!&
"&)*
&
%&
& )5&&
5 &: 57 %&):
&
5)5
= =&
-
.)97& 6:
(+
5)5 &
)%5
6(&RUQHURI3RQG
! 6
+'*
-
)
>
+
-
+
'
%5?&) !.&%
,
:&&
2 *
%5?&) &
&-(..
$
+'
&&"5 *
<<
<3
</
@A
@B
&: *
&
!.&%
&
)%5
%&"
5 &
,
%
2 &
5$ 33@A< 5$
.#$?)75%(&: .%%( (&:"<?!%( 3/3<#$.A=3@=3<
/
3 @
<
B
C
A
D
/
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP
CL-ML
SP-SM
SP-SM
A41 of 103
*
-
$%"& !"!#
$%"&
+'2
#
-
$%"&#
.*
+
A#/ *
. %
'
0 +
''
'
)
1 %'2
, )
*'
,
-
3/33
4'
+
%'2
#
$%5!6&%
%&$
5$$& .(
7 .(
!%$ &8)"5
7&% &8)"5 &
&
!.&%
/
5%&5
.!)9& 6:
!%7)& &&"5
)5%)5%
"#$%&'(&(&'
&;!&
"&)*
&
%&
& )5&&
5 &: 57 %&):
,
&
5)5
= =&
-
.)97& 6:
(+
5)5 &
)%5
6:&RUQHURI3RQG
! 6
+'*
-
)
>
+
-
+
'
%5?&) !.&%
,
:&&
2 *
%5?&) &
&-(..
$
+'
&&"5 *
<<
<3
</
@A
&: *
&
!.&%
/
&
)%5
%&"
5 &
,
%
2 &
5$ 33@A< 5$
.#$?)75%(&: .%%( (&:"<?!%( 3/3<#$.A=3@=3<
/
3 @
<
B
C
A
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SP-SM
SP
A42 of 103
@/ D@
-
-
$%"& !"!#
2 #
#
#
(
#
#
( )( ) #
'
#
.*
+
/#/ *
. %
'
0 +
''
'
)
1 %'2
, )
*'
,
-
3/33
4'
+
%'2
#
@, 3@,A
$%5!6&%
%&$
5$$& .(
7 .(
!%$ &8)"5
7&% &8)"5 &
&
!.&%
5%&5
.!)9& 6:
!%7)& &&"5
)5%)5%
"#$%&'(&(&'
&;!&
"&)*
&
%&
& )5&&
5 &: 57 %&):
&
5)5
= =&
-
.)97& 6:
(+
5)5 &
)%5
1:&RUQHURI3RQG
! 6
+'*
-
)
>
+
-
+
'
%5?&) !.&%
,
:&&
2 *
%5?&) &
&-(..
$
+'
&&"5 *
<3
</
@A
@B
@<
&: *
&
!.&%
&
)%5
%&"
5 &
,
%
2 &
5$ 33@A< 5$
.#$?)75%(&: .%%( (&:"<?!%( 3/3<#$.A=3@=3<
/
3 @
<
B
C
A
D
/
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP-SM
SP-SM
ML
SP-SM
CL-ML
SP
A43 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
EURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 EURZQPRLVW
6,/7<&/$<
&/0/
EURZQSHUFKHGZDWHU
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
IWRQ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21 '(6&5,37,21
&HQWHURI:VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
Depth (feet)
SP-SM
SP
CL-ML
A44 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVWPHGLXP6$1'
$//89,80
/LJKWJUD\
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVWILQH6$1'
VHHSDJH
6,/7<&/$<
&/0/
JUD\LVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP-SM
SP
CL-ML
SP
A45 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
$//89,80
/LJKWJUD\
6,/7<&/$<
&/0/
OLJKWJUD\PRLVWZLWKOHQVHVRISRRUO\JUDGHG6$1'
63 %RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI6VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP
CL-ML
A46 of 103
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'ZLWK*5$9(/
63 OLJKWEURZQPRLVW
*UD\
6HHSDJH
6,/7<&/$<
&/0/
JUD\PRLVWZLWKOHQVHVRI3RRUO\JUDGHG6$1'
63 %RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
CL-ML
A47 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
$//89,80
'HQVHEODFN
&/$<SRFNHWV
/HDQ&/$<
&/
VWLIIEODFNPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHEODFNPRLVW
/HDQ&/$<
&/
VWLIIEODFNPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHJUD\PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
2&
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI1VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
SP
CL
SP
CL
A48 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVW
$//89,80
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVWJUDYHOO\OD\HU
6$1'<6,/7
0/
JUHHQLVK\HOORZDQGJUD\PRLVW
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 UHGGLVKEURZQPRLVW
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVW
6,/7<6$1'
60 UHGGLVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3,
//3/3,
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 ML
SP-SM
CL-ML
SP
CL-ML
CL-ML
SM
A49 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQPRLVW
$//89,80
6,/7<&/$<
&/0/
UHGGLVKEURZQZLWKJUD\PRWWOLQJPRLVWSRFNHWRI
ZHOOJUDGHG6$1'ZLWK*5$9(/
6:
6HHSDJH
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
\HOORZLVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
IWRQ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI(VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 CL-ML
SP-SM
SP-SM
A50 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQPRLVW
$//89,80
:HOOJUDGHG6$1'ZLWK*5$9(/
6:
UHGGLVKEURZQPRLVW
6$1'<6,/7
0/
UHGGLVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 JUD\PRLVW
6$1'<6,/7
0/
UHGGLVKEURZQPRLVWZLWK6$1'OHQVHV
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3,
//3/3,
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SW
ML
SP
ML
SP
A51 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\PRLVWIHZFRDUVHURXQGHG
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 GDUNJUD\ZLWKEODFNVSRWVPRLVW
%ODFNJUDYHOO\OD\HU
/HDQ&/$<
&/
UHGGLVKEURZQPRLVWVHHSDJH
6$1'<6,/7
0/
EURZQPRLVW
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
2&
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP-SM
SP
SP
CL
ML
A52 of 103
6,/7
0/
JUD\LVKEURZQZLWKEODFNPRWWOLQJPRLVWIHZPHGLXPURXQGHG
*5$9(/
$//89,80
)LQH6$1'VHHSDJHLURQVWDLQLQJ
:HOOJUDGHG*5$9(/ZLWK6$1'
*:
EURZQDQGJUD\PRWWOHGPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQPRLVWILQH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21 '(6&5,37,21
&HQWHURI:VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 ML
GW
SP-SM
SP
A53 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVWPHGLXP
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVWLURQVWDLQLQJSRFNHWRI6,/7
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
UHGGLVKEURZQWRJUD\LVKEURZQPRLVW
OD\HUHGZLWKFOHDQSRRUO\JUDGHG6$1'
63 3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP
SP-SM
SP
A54 of 103
3RRUO\JUDGHG6$1'
63 GDUNEURZQPRLVWWUDFHURXQGHG*5$9(/PHGLXP
6$1'
$//89,80
/LJKWJUD\LVKEURZQPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWJUD\LVKEURZQPRLVWILQH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVWPHGLXP6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP
SP-SM
SP
A55 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVWWUDFHURXQGHG
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWJUD\LVKEURZQPRLVWILQH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVWPHGLXP6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
SP-SM
SP
A56 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVW
$//89,80
3UHGRPLQDQWHO\%,2),//
3RRUO\JUDGHG6$1'
63 JUD\PRLVW
'DUNJUD\
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
GDUNJUD\PRLVWILQH6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
SP
SP-SM
A57 of 103
!
"!
#
"$% &
#
!
%
!
" '
& ((!) '
" *
+
,
&
++ +
-
. *+/
0 -'+0
# 1)11
2+
&
*+/
!
3*$
4 5*
*5
3 $335 "6
%
"6
*
3 57-
$
%5* 57-
$
5 5
"5*
$*5
$
5 *5
5 -$55
"-85 49
*%
-5 55
$
!
-$
*
-$*
"#$ %&'%'%&
5:5
"$% ()$
5 *5
*
5 -$55
*
5 -
' ((
$
59 $% *5
-9
5 $-
$
;
;5 #
"
-8%5 49
'+
$-
$
5 -*$
4 #
-
&+'
<
&
#
&
+
*$=5-
"5*
955
/'
*$=5-
5 %,'
55 $
3&+
'
(>?
(>@
(>>
(>(
(1A
59 '
5 "5*
5 -*$
*5
$
5 *
/
@ 5
$3 11>(BC $3
"!3= -
%$*
659 "*
*6 659 C =
*6 1)1C!3" B;1>;1C
)
(
1 >
C
@
D
?
B
A
()
((
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
A58 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 EURZQPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
EURZQPRLVWILQH6$1'
/HQVHRIOLJKWJUD\SRRUO\JUDGHG6$1'
63 %RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3,
//3/3,
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
SP-SM
A59 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPHURXQGHG
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 GHQVHOLJKW\HOORZLVKEURZQPRLVWWUDFH*5$9(/
:HOOJUDGHG6$1'
6:
GHQVHOLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1HDU1:FRUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP
SW
A60 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPH*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\LVKEURZQEODFNPRWWOHGPRLVW
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHOLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SC
SW
A61 of 103
:HOOJUDGHG6$1'
6:
ORRVHJUD\LVKEURZQPRLVWVRPH*5$9(/VRPH
ILQHV
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHOLJKWEURZQDQGJUD\PRLVWVRPH
*5$9(/
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHOLJKWJUD\LVKEURZQPRLVW
&/$<SRFNHWVIURPWRIHHW
6$1'<IDW&/$<
&+
PHGLXPVWLIIOLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SW
SP
SW
CH
A62 of 103
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPH *5$9(/VRPHILQHV
$//89,80
<HOORZLVKEURZQ
6$1'<IDW&/$<
&+
VWLII\HOORZLVKEURZQZLWKJUD\DQGZKLWHPRWWOLQJPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHOLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 CH
SP
SP
A63 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\PRLVW
%ODFN&/$<SRFNHWV
6,/7<&/$<
&/0/
VWLIIEURZQZHW
:HOOJUDGHG6$1'
6:
JUD\DQGEODFN
/LJKWJUD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP
SW
CL-ML
SW
A64 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQZLWKEODFNVSRWVPRLVW
$//89,80
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\PRLVWZLWKEURZQIDW&/$<
&+
SRFNHWV
'HQVHFOHDQ
/HDQ&/$<
&/
VWLIIEURZQWROLJKWEURZQPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHOLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 CL
SC
SW
SP
A65 of 103
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPH *5$9(/VRPHILQHV
$//89,80
6,/7<&/$<ZLWK6$1'
&/0/
VWLIIOLJKWEURZQZLWKJUD\VWUHDNLQJ
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 CL-ML
SP
SW
A66 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVWWUDFH*5$9(/
$//89,80
3RRUO\JUDGHG6$1'ZLWK&/$<
636&
GHQVHJUD\LVKEURZQWROLJKWEURZQ
PRLVW
6,/7<&/$<(<6$1'
6&60
PHGLXPGHQVHJUD\LVKEURZQPRLVW
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\LVKEURZQPRLVWFOHDQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP-SC
SC-SM
SW
A67 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQZLWKEODFNVSRWVPRLVW
$//89,80
:HOOJUDGHG6$1'ZLWK&/$<
6:6&
JUD\LVKEURZQZLWKEODFNVSRWVPRLVW
5HGGLVKEURZQOD\HURIVLOW\&/$<
&/0/
:HOOJUDGHG6$1'
6:
JUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SC
SW-SC
SW
A68 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\DQGEODFNPRLVW
&/$</D\HU
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SC
SP
A69 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQZLWKEODFNVSRWVPRLVW
$//89,80
/LJKWEURZQ
6$1'<IDW&/$<
&+
VWLIIOLJKWEURZQPRLVWWUDFH*5$9(/
3RRUO\JUDGHG6$1'ZLWK&/$<
636&
PHGLXPGHQVHOLJKW\HOORZLVKEURZQ
PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SC
CH
SP-SC
A70 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\DQGEODFNPRLVW
WRLQFK&/$<DQG*5$9(/SRFNHWV
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP
A71 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQWREODFNPRLVW
$//89,80
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEODFNPRLVW&/$<
SRFNHWV
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
5 Depth (feet)
SC
SP-SM
A72 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQWREODFNPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEODFNPRLVW&/$<SRFNHWV
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
5 Depth (feet)
SC
SP
A73 of 103
3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO &OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\ 6LOW\VDQGWRVDQG\VLOW &OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG 9HU\VWLIIVDQGWRFOD\H\VDQG 9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A74 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A75 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A76 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A77 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A78 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A79 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A80 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A81 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A82 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A83 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A84 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A85 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A86 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A87 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A88 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A89 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A90 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A91 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A92 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A93 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A94 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A95 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A96 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A97 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A98 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A99 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A100 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A101 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A102 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A103 of 103
APPENDIX B - LABORATORY TEST RESULTS
24E04-01 58a 20.0 MCAL 103 87 19 0 73 27 -- -- -- -- -- -- -- -- -- -- P CLAYEY SAND (SC) 24E04-01 59 25.0 MCAL -- -- -- 0 93 7 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E04-01 61 30.0 MCAL 111 101 11 0 95 5 -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND with SILT (SP-SM) 24E04-02 65 20.0 SPT -- -- -- 1 94 5 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E04-03 72 20.0 SPT -- -- -- 1 95 4 -- -- -- -- -- -- -- -- -- -- -- POORLY GRADED SAND (SP) 24E06-01 33 20.0 MCAL -- -- -- 0 93 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E06-02 40 25.0 MCAL -- -- -- 18 76 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY and GRAVEL (SP-SC)
24E06-02 41a 30.0 MCAL 117 103 13 0 45 55 -- -- -- -- -- -- -- -- -- -- P SANDY lean CLAY (CL) 24E06-03 47 30.0 MCAL 119 100 19 0 59 40 -- -- -- -- -- -- -- -- -- -- P SILTY SAND (SM) 24E06-04 52 20.0 MCAL -- -- -- 0 94 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E14-01 4 20.0 MCAL -- -- -- 2 81 17 -- -- -- -- -- -- -- -- -- -- -- CLAYEY SAND (SC) 24E14-01 6 30.0 MCAL 121 98 24 0 39 61 -- -- -- -- -- -- -- -- -- -- P SANDY lean CLAY (CL) 24E14-02 14 25.0 MCAL 108 101 7 0 97 3 -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24E14-03 19 20.0 MCAL -- -- -- 0 94 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY (SP-SC) 24E14-04 26 20.0 MCAL -- -- -- 0 95 5 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY (SP-SC) 24TP02-01 CRUST 0.0 GRAB -- -- -- 0 76 24 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP02-01 5 2.3 MCAL 109 91 20 0 84 16 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP02-02 6 2.0 OTHER -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24TP02-02 8 3.0 GRAB 116 96 20 -- -- -- -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND (SP) 24TP02-03 9 1.0 MCAL 119 102 17 0 61 39 -- -- -- -- -- -- -- -- -- -- -- SILTY, CLAYEY SAND (SC-SM) Total Unit Weight, t, (pcf)
Dry Unit Weight, d
, (pcf)
MoistureContent (%)
Gravel (%)Sand (%)Fines (%)
Plasticity Index (PI)
Liquid Limit (LL)
pH
Resistivity( - cm)
Optimum MoistureContent (%)R-Value
Compaction
Additional Testing
2- (mg/kg)
(mg/kg) Cl
- SO4
Expansion Index
Gradation Corrosion
Sample
Type
Soil/Rock Classification
Sample Information
SUMMARY OF LABORATORY TEST RESULTS
Boring
No.
Sample
No.
Depth
(ft)
Atterberg
Max. Dry UnitWeight, d, MAX, (pcf)
YEH SUMMARY OF TEST RESULTS 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24
PROJECT MANAGER
J. King
CHECKED BY
J. King
SHEET
1 of 3
PREPARED BY
R. Hooke
PROJECT NO.
223-184
PROJECT NAME
Santa Maria WWTP
REVISION DATE
10-1-24
B1 of 49
24TP02-04 1 2.0 OTHER 124 103 21 -- -- -- -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24TP02-06 11 4.0 MCAL 115 95 21 0 91 9 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24TP02-07 10 2.5 MCAL 115 92 24 1 90 9 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24TP02-08 12 2.0 MCAL 108 88 24 0 87 13 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP04-01 10 0.0 GRAB -- -- 12 -- -- -- -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND with SILT (SP-SM) 24TP04-01 11 3.0 GRAB -- -- 17 2 91 7 -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND with SILT (SP-SM) 24TP04-02 12 3.0 GRAB -- -- 17 1 95 4 -- -- -- -- -- -- -- -- -- -- OC POORLY GRADED SAND (SP) 24TP04-04 13 0.0 GRAB -- -- -- 1 86 13 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP06-01 1 4.0 GRAB 121 93 30 -- -- -- 8 31 -- -- -- -- -- -- -- -- P SILT (ML) 24TP06-05 2 4.0 GRAB -- -- -- 31 67 2 -- -- -- -- -- -- -- -- -- -- -- POORLY GRADED SAND with GRAVEL (SP) 24TP06-06 7 0.0 GRAB -- -- 4 -- -- -- -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND (SP) 24TP06-06 3 3.5 GRAB 111 104 7 -- -- -- -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24TP06-07 5 3.0 GRAB 121 100 22 -- -- -- 8 26 -- -- -- -- -- -- -- -- P SILTY CLAY (CL-ML) 24TP06-09 6 3.0 GRAB 119 92 29 -- -- -- 2 24 -- -- -- -- -- -- -- -- P SANDY SILT (ML) 24TP08-01 16 4.0 GRAB -- -- 9 -- -- -- -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND (SP) 24TP08-02 17 2.0 GRAB -- -- -- 1 4 95 -- -- -- -- -- -- -- -- -- -- -- SILT (ML) 24TP11-05 9 5.0 GRAB 115 89 28 -- -- -- 3 21 -- -- -- -- -- -- -- -- P SANDY SILT (ML) 24TP14-04 3 4.0 MCAL 124 102 22 -- -- -- -- -- -- -- -- -- -- -- -- -- P SANDY fat CLAY (CH) 24TP14-07 5 3.5 MCAL 121 91 32 -- -- -- -- -- -- -- -- -- -- -- -- -- P SILTY CLAY with SAND (CL-ML) 24TP14-08 4 3.5 GRAB -- -- -- 0 71 28 -- -- -- -- -- -- -- -- -- -- -- SILTY, CLAYEY SAND (SC-SM) Total Unit Weight, t, (pcf)
Dry Unit Weight, d
, (pcf)
MoistureContent (%)
Gravel (%)Sand (%)Fines (%)
Plasticity Index (PI)
Liquid Limit (LL)
pH
Resistivity( - cm)
Optimum MoistureContent (%)R-Value
Compaction
Additional Testing
2- (mg/kg)
(mg/kg) Cl
- SO4
Expansion Index
Gradation Corrosion
Sample
Type
Soil/Rock Classification
Sample Information
SUMMARY OF LABORATORY TEST RESULTS
Boring
No.
Sample
No.
Depth
(ft)
Atterberg
Max. Dry UnitWeight, d, MAX, (pcf)
YEH SUMMARY OF TEST RESULTS 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24
PROJECT MANAGER
J. King
CHECKED BY
J. King
SHEET
2 of 3
PREPARED BY
R. Hooke
PROJECT NO.
223-184
PROJECT NAME
Santa Maria WWTP
REVISION DATE
10-1-24
B2 of 49
24TP14-11 8 2.5 MCAL 117 91 29 -- -- -- -- -- -- -- -- -- -- -- -- -- P SANDY fat CLAY (CH) 24TP14-11 9 3.5 GRAB -- -- -- 0 94 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY (SP-SC) 24TP14-13 10 3.0 GRAB -- -- -- 0 93 7 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) Total Unit Weight, t, (pcf)
Dry Unit Weight, d
, (pcf)
MoistureContent (%)
Gravel (%)Sand (%)Fines (%)
Plasticity Index (PI)
Liquid Limit (LL)
pH
Resistivity( - cm)
Optimum MoistureContent (%)R-Value
Compaction
Additional Testing
2- (mg/kg)
(mg/kg) Cl
- SO4
Expansion Index
Gradation Corrosion
Sample
Type
Soil/Rock Classification
Sample Information
SUMMARY OF LABORATORY TEST RESULTS
Boring
No.
Sample
No.
Depth
(ft)
Atterberg
Max. Dry UnitWeight, d, MAX, (pcf)
YEH SUMMARY OF TEST RESULTS 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24
PROJECT MANAGER
J. King
CHECKED BY
J. King
SHEET
3 of 3
PREPARED BY
R. Hooke
PROJECT NO.
223-184
PROJECT NAME
Santa Maria WWTP
REVISION DATE
10-1-24
B3 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24E04-01
24E04-02
24E04-03
24E06-01
24E06-02
25.0 ft
20.0 ft
20.0 ft
20.0 ft
25.0 ft
25.0 ft
20.0 ft
20.0 ft
20.0 ft
25.0 ft
24E04-01
24E04-02
24E04-03
24E06-01
24E06-02
Classification LL PL PI Cc
D30 D10
0.135
0.127
0.173
0.12 0.207
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810
7.1 5.5
4.2 6.4
5.5 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
Poorly graded SAND with SILT (SP-SM)
Poorly graded SAND with SILT (SP-SM)
POORLY GRADED SAND (SP)
Poorly graded SAND with SILT (SP-SM)
Poorly graded SAND with CLAY and GRAVEL (SP-SC)
%Sand %Clay
92.9 93.6
94.8 93.5
76.3 %Gravel %Silt
0.0 1.0
1.1 0.1
18.2 D100 D50
9.5 19
9.5 9.5
19 0.38
0.268
0.341
0.259
0.529
0.606
0.372
0.509
0.33 0.944
0.752
0.446
0.611
0.373
1.352
5.58 3.50
3.53 3.10
6.55 Cu
1.43 1.26
1.10 1.50
1.00 YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
1 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B4 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24E06-04
24E14-01
24E14-03
24E14-04
24TP02-01
20.0 ft
20.0 ft
20.0 ft
20.0 ft
0.0 ft
20.0 ft
20.0 ft
20.0 ft
20.0 ft
0.0 ft
24E06-04
24E14-01
24E14-03
24E14-04
24TP02-01
Classification LL PL PI Cc
18.5 D30 D10
0.161
-- 0.105
0.174
0.012
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810
6.3 16.8
6.1 5.4
14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
Poorly graded SAND with SILT (SP-SM)
CLAYEY SAND (SC)
Poorly graded SAND with CLAY (SP-SC)
Poorly graded SAND with CLAY (SP-SC)
SILTY SAND (SM)
%Clay
5.6 %Sand
93.7 81.4
93.9 94.6
75.8 %Gravel %Silt
0.0 1.8
0.0 0.0
0.0 D100 D50
4.75 19
9.5 9.5
2 0.376
0.279
0.255
0.357
0.145
0.531
0.485
0.342
0.518
0.298
0.612
0.581
0.395
0.607
0.374
3.80 -- 3.76
3.49 32.03
Cu
1.44 -- 1.57
1.21 4.83
YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
2 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B5 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24TP02-01
24TP02-03
24TP02-04
24TP02-06
24TP02-07
2.3 ft
1.0 ft
2.0 ft
4.0 ft
2.5 ft
2.3 ft
1.0 ft
2.0 ft
4.0 ft
2.5 ft
24TP02-01
24TP02-03
24TP02-04
24TP02-06
24TP02-07
Classification LL PL PI Cc
12.5 24.4
7.7 7.9
D30 D10
0.046
0.002
0.033
0.077
0.079
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
SILTY SAND (SM)
SILTY, CLAYEY SAND (SC-SM)
Poorly graded SAND (SP)
Poorly graded SAND with SILT (SP-SM)
Poorly graded SAND with SILT (SP-SM)
%Clay
3.8 14.5
4.6 1.7
1.4 %Sand
83.7 60.6
90.6 90.0
%Gravel %Silt
0.0 0.4
0.0 0.6
D100 D50
1.18 9.5
4.75 9.5
0.102
0.037
-- 0.153
0.194
0.157
0.154
-- 0.191
0.301
0.18 0.198
-- 0.214
0.361
3.90 93.02
-- 2.80
4.59 Cu
1.26 3.27
-- 1.42
1.32 YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
3 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B6 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24TP02-08
24TP04-01
24TP04-02
24TP04-04
24TP06-05
2.0 ft
3.0 ft
3.0 ft
0.0 ft
4.0 ft
2.0 ft
3.0 ft
3.0 ft
0.0 ft
4.0 ft
24TP02-08
24TP04-01
24TP04-02
24TP04-04
24TP06-05
Classification LL PL PI Cc
10.3 5.5
4.0 11.1
D30 D10
0.059
0.159
0.114
0.053
0.339
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810
2.3 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
SILTY SAND (SM)
Poorly graded SAND with SILT (SP-SM)
POORLY GRADED SAND (SP)
SILTY SAND (SM)
POORLY GRADED SAND with GRAVEL (SP)
%Clay
2.5 1.3
0.3 2.0
%Sand
87.2 91.5
95.1 85.6
66.9 %Gravel %Silt
0.0 1.7
0.5 1.3
30.8 D100 D50
4.75 12.5
9.5 12.5
76.2 0.109
0.382
0.212
0.308
0.727
0.161
0.566
0.323
0.452
1.363
0.186
0.689
0.402
0.548
1.866
3.15 4.33
3.51 10.41
5.50 Cu
1.08 1.33
0.98 3.29
0.83 YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
4 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B7 of 49
>>
0 >>
5 10
15 20
25 30
35 40
45 50
55 60
65 70
75 80
85 90
95 100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24TP08-02
24TP14-08
24TP14-11
24TP14-13
2.0 ft
3.5 ft
3.5 ft
3.0 ft
2.0 ft
3.5 ft
3.5 ft
3.0 ft
24TP08-02
24TP14-08
24TP14-11
24TP14-13
Classification LL PL PI Cc
83.9 15.7
3.9 6.2
D30 D10
0.005
0.003
0.153
0.125
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
SILT (ML)
SILTY, CLAYEY SAND (SC-SM)
Poorly graded SAND with CLAY (SP-SC)
Poorly graded SAND with SILT (SP-SM)
%Clay
11.2 12.5
2.5 0.5
%Sand
3.7 71.5
93.6 93.3
%Gravel %Silt
1.2 0.3
0.0 0.0
D100 D50
9.5 9.5
9.5 4.75
0.013
0.087
0.285
0.245
0.029
0.226
0.386
0.351
0.036
0.304
0.442
0.4 7.63
117.87
2.90 3.19
Cu
1.01 9.72
1.21 1.20
YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
5 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B8 of 49
Project No.
Testing Date
24E4‐01 Sample No. 58A Depth (ft) 20.0
Soil Description
Dish ID 106 288.36 Water Content 0.0%
Dish Mass (g) 128.47 288.36 Dry Post‐Wash (g) 118.25
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
No. 10 2.00 0.06 0.0% 100.0%
No. 20 0.84 0.30 0.2% 99.8%
No. 40 0.425 0.35 0.4% 99.6%
No. 60 0.250 1.69 1.5% 98.5%
No. 100 0.150 49.31 32.3% 67.7%
No. 200 0.075 64.94 73.0% 27.0%
Pan ‐‐ 1.76 Sieve Continuity 99.9%
116.65
118.41
0.00 0.06
0.36 0.71
2.40 51.71
0.00 0.00
0.00 0.00
0.00 0.00
4" of poorly‐graded SAND (SP) with 1" of lean CLAY (CL): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B9 of 49
Project No.
Testing Date
24E4‐01 Sample No. 61 Depth (ft) 30.0
Soil Description
Dish ID 121 288.54 Water Content 0.0%
Dish Mass (g) 128.56 288.54 Dry Post‐Wash (g) 151.97
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.00 0.0% 100.0%
No. 4 * 4.75 0.15 0.1% 99.9%
No. 10 2.00 2.93 1.9% 98.1%
No. 20 0.84 27.75 19.3% 80.7%
No. 40 0.425 66.21 60.7% 39.3%
No. 60 0.250 31.86 80.6% 19.4%
No. 100 0.150 16.96 91.2% 8.8%
No. 200 0.075 6.28 95.1% 4.9%
Pan ‐‐ 0.21 Sieve Continuity 99.8%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND (SP): gray brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
152.14
152.35
0.15 3.08
30.83 97.04
128.90
145.86
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
Cu=3.9
Cc=1.2
B10 of 49
Project No.
Testing Date
24E6‐02 Sample No. 41A Depth (ft) 30.0
Soil Description
Dish ID 122 245.68 Water Content 0.0%
Dish Mass (g) 128.56 245.68 Dry Post‐Wash (g) 53.03
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.0% 100.0%
No. 10 2.00 0.00 0.0% 100.0%
No. 20 0.84 0.18 0.2% 99.8%
No. 40 0.425 2.32 2.1% 97.9%
No. 60 0.250 10.92 11.5% 88.5%
No. 100 0.150 21.72 30.0% 70.0%
No. 200 0.075 17.20 44.7% 55.3%
Pan ‐‐ 0.81 Sieve Continuity 99.8%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY (CL): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
52.34 53.15
0.00 0.00
0.18 2.50
13.42 35.14
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B11 of 49
Project No.
Testing Date
24E6‐03 Sample No. 47 Depth (ft) 30.0
Soil Description
Dish ID 115 333.15 Water Content 0.0%
Dish Mass (g) 128.21 333.15 Dry Post‐Wash (g) 122.76
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.00 0.0% 100.0%
No. 4 * 4.75 0.76 0.4% 99.6%
No. 10 2.00 0.57 0.6% 99.4%
No. 20 0.84 2.39 1.8% 98.2%
No. 40 0.425 29.32 16.1% 83.9%
No. 60 0.250 40.01 35.6% 64.4%
No. 100 0.150 31.19 50.9% 49.1%
No. 200 0.075 18.25 59.8% 40.2%
Pan ‐‐ 1.12 Sieve Continuity 99.3%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND with silt (SP‐SM) with lean CLAY (CL) seams: light brown, mois
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
122.49
123.61
0.76 1.33
3.72 33.04
73.05 104.24
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B12 of 49
Project No.
Testing Date
24E14‐01 Sample No. 6 Depth (ft) 30.0
Soil Description
Dish ID 107 224.20 Water Content 0.0%
Dish Mass (g) 128.09 224.20 Dry Post‐Wash (g) 38.52
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
No. 10 2.00 0.01 0.0% 100.0%
No. 20 0.84 0.09 0.1% 99.9%
No. 40 0.425 0.57 0.7% 99.3%
No. 60 0.250 3.47 4.3% 95.7%
No. 100 0.150 14.54 19.4% 80.6%
No. 200 0.075 18.81 39.0% 61.0%
Pan ‐‐ 1.26 Sieve Continuity 99.4%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY CL): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
37.49 38.75
0.00 0.01
0.10 0.67
4.14 18.68
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B13 of 49
Project No.
Testing Date
24E14‐02 Sample No. 14 Depth (ft) 25.0
Soil Description
Dish ID 102 387.28 Water Content 0.0%
Dish Mass (g) 128.55 387.28 Dry Post‐Wash (g) 250.29
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.00 0.0% 100.0%
No. 4 * 4.75 0.35 0.1% 99.9%
No. 10 2.00 5.98 2.4% 97.6%
No. 20 0.84 28.56 13.5% 86.5%
No. 40 0.425 75.67 42.7% 57.3%
No. 60 0.250 86.40 76.1% 23.9%
No. 100 0.150 42.24 92.5% 7.5%
No. 200 0.075 11.08 96.7% 3.3%
Pan ‐‐ 0.34 Sieve Continuity 99.9%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND (SP): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
250.28
250.62
0.35 6.33
34.89 110.56
196.96
239.20
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
Cu=2.8
Cc=1
B14 of 49
Project No.
Testing Date
24TP2‐2 Sample No. 6 Depth (ft) 2.0
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 102.68 102.68
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
102.68 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 102.68
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 102.68 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
102.68
Post Wash ID 108
Dry Mass Post Wash
(g) 95.06
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
5.27 5.27 5.1% 94.9% 94.9%
21.72 26.99 26.3% 73.7% 73.7%
25.67 52.66 51.3% 48.7% 48.7%
27.41 80.07 78.0% 22.0% 22.0%
13.87 93.94 91.5% 8.5% 8.5%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND with silt (SP‐SM): red yelllow with black staining, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 102.68
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B15 of 49
Project No.
Testing Date
24TP2‐2 Sample No. 6 Depth (ft) 2.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND with silt (SP‐SM): red yelllow with black staining, moist
0.00 93.94 101.2%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 102.68 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 102.68
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 11.0 21.0 14.5 0.0358 6.7% 6.7%
5 10.0 21.0 14.7 0.0227 5.8% 5.8%
15 9.0 21.0 14.8 0.0132 4.8% 4.8%
30 9.0 21.0 14.8 0.0093 4.8% 4.8%
60 8.5 21.0 14.9 0.0066 4.3% 4.3%
90 8.0 21.0 15.0 0.0054 3.9% 3.9%
120 8.0 21.0 15.0 0.0047 3.9% 3.9%
240 7.0 21.0 15.2 0.0033 2.9% 2.9%
480 7.0 21.0 15.2 0.0024 2.9% 2.9%
1440 6.5 20.0 15.2 0.0014 2.4% 2.4%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B16 of 49
Project No.
Testing Date
24TP2‐4 Sample No. 1 Depth (ft) 2.0
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 104.28 104.28
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
104.28 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 104.28
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 104.28 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
104.28
Post Wash ID 110
Dry Mass Post Wash
(g) 88.52
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
1.86 1.86 1.8% 98.2% 98.2%
7.07 8.93 8.5% 91.5% 91.5%
21.99 30.92 29.5% 70.5% 70.5%
37.58 68.50 65.5% 34.5% 34.5%
18.31 86.81 83.0% 17.0% 17.0%
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan 104.28
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Silty SAND (SM): red yelllow with black staining, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
B17 of 49
Project No.
Testing Date
24TP2‐4 Sample No. 1 Depth (ft) 2.0
Soil Description
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Silty SAND (SM): red yelllow with black staining, moist
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
1.05 87.86 100.8%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 104.64 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 104.64
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 16.0 21.0 13.7 0.0347 11.4% 11.4%
5 14.0 21.0 14.0 0.0222 9.5% 9.5%
15 12.0 21.0 14.3 0.0130 7.6% 7.6%
30 11.0 21.0 14.5 0.0092 6.6% 6.6%
60 11.0 21.0 14.5 0.0065 6.6% 6.6%
90 10.0 21.0 14.7 0.0054 5.7% 5.7%
120 10.0 21.0 14.7 0.0046 5.7% 5.7%
240 9.5 21.0 14.7 0.0033 5.2% 5.2%
480 9.5 21.0 14.7 0.0023 5.2% 5.2%
1440 9.0 20.0 14.8 0.0014 4.7% 4.7%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B18 of 49
Project No.
Testing Date
24TP6-1 Sample No. 1 Depth (ft) 4.0
Soil Description
Tray ID -- Air-Dry Soil Mass (g) 51.10 51.10
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
51.10 Sieve Continuity 100.0%
0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 51.10
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 51.10 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
51.10 Post Wash ID 110
Dry Mass Post Wash
(g) 4.70
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
No. 20 0.850 0.00 0.00 0.0% 100.0% 100.0%
No. 40 0.425 0.13 0.13 0.3% 99.7% 99.7%
No. 60 0.250 0.12 0.25 0.5% 99.5% 99.5%
No. 100 0.150 0.45 0.70 1.4% 98.6% 98.6%
No. 200 0.075 3.61 4.31 8.4% 91.6% 91.6%
0.51 4.82 97.5%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
0.00 Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): olive brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air-Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 51.10
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan Sieve Continuity
B19 of 49
Project No.
Testing Date
24TP6-1 Sample No. 1 Depth (ft) 4.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): olive brown, moist
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 Mass of Air-Dried Soil (g) 51.10 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 51.10
Composite Correction 6
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 35.5 22.5 10.5 0.0300 57.2% 57.2%
5 28.0 22.5 11.7 0.0201 42.6% 42.6%
15 22.0 22.5 12.7 0.0121 31.0% 31.0%
30 20.0 22.5 13.0 0.0086 27.1% 27.1%
60 17.5 22.5 13.4 0.0062 22.3% 22.3%
90 16.0 22.5 13.7 0.0051 19.4% 19.4%
120 15.5 22.5 13.8 0.0044 18.4% 18.4%
240 15.0 23.0 13.8 0.0031 17.4% 17.4%
480 13.5 23.0 14.1 0.0022 14.5% 14.5%
1440 13.0 21.0 14.2 0.0013 13.6% 13.6%
HYDROMETER
Corrected Dry Mass (g)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001 % Passing
Particle Diameter (mm)
Gradation Curve
B20 of 49
Project No.
Testing Date
24TP6-6 Sample No. 3 Depth (ft) 3.5
Soil Description
Tray ID -- Air-Dry Soil Mass (g) 682.47 682.47
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.00 0.0% 100.0%
1/2 in * 12.7 7.77 1.1% 98.9%
3/8 in * 9.50 13.79 3.2% 96.8%
No. 4 * 4.75 18.39 5.9% 94.1%
642.46 Sieve Continuity 100.0%
0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 121.50
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 121.50 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 7.40 93.9% 88.4%
114.10
Post Wash ID 121
Dry Mass Post
Wash (g) 108.88
Sieve No. Size, mm Mass Retained (g)
Cum. Ret.
(g) % Retained % Passing
Combined %
Passing
No. 20 0.850 37.21 37.21 32.6% 67.4% 59.6%
No. 40 0.425 46.27 83.48 73.2% 26.8% 23.7%
No. 60 0.250 16.55 100.03 87.7% 12.3% 10.9%
No. 100 0.150 6.03 106.06 93.0% 7.0% 6.2%
No. 200 0.075 2.65 108.71 95.3% 4.7% 4.2%
0.15 108.86 100.0%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
0.00 Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly-graded SAND (SP): red yellow, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air-Dried Soil (g)
0.00 0.00
0.00 7.77
21.56 39.95
Pan 682.41
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
6.1%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan Sieve Continuity
B21 of 49
Project No.
Testing Date
24TP6-6 Sample No. 3 Depth (ft) 3.5
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly-graded SAND (SP): red yellow, moist
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 Mass of Air-Dried Soil (g) 114.10 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 114.10
Composite Correction 6
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 11.0 22.5 14.5 0.0353 4.3% 3.8%
5 10.0 22.5 14.7 0.0225 3.5% 3.1%
15 9.0 22.5 14.8 0.0130 2.6% 2.3%
30 9.0 22.5 14.8 0.0092 2.6% 2.3%
60 8.5 22.5 14.9 0.0065 2.2% 1.9%
90 8.0 22.5 15.0 0.0054 1.7% 1.5%
120 7.5 22.5 15.1 0.0046 1.3% 1.2%
240 7.0 23.0 15.2 0.0033 0.9% 0.8%
480 6.0 23.0 15.3 0.0023 0.0% 0.0%
1440 6.0 21.0 15.3 0.0014 0.0% 0.0%
HYDROMETER
Corrected Dry Mass (g)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001 % Passing
Particle Diameter (mm)
Gradation Curve
B22 of 49
Project No.
Testing Date
24TP11-5 Sample No. 9 Depth (ft) 5.0
Soil Description
Tray ID -- Air-Dry Soil Mass (g) 100.30 100.30
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
100.30 Sieve Continuity 100.0%
0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 100.30
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 100.30 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
100.30
Post Wash ID 112
Dry Mass Post
Wash (g) 57.44
Sieve No. Size, mm Mass Retained (g)
Cum. Ret.
(g) % Retained % Passing
Combined %
Passing
No. 20 0.850 0.01 0.01 0.0% 100.0% 100.0%
No. 40 0.425 0.02 0.03 0.0% 100.0% 100.0%
No. 60 0.250 0.23 0.26 0.2% 99.8% 99.8%
No. 100 0.150 13.47 13.73 12.0% 88.0% 88.0%
No. 200 0.075 40.27 54.00 47.3% 52.7% 52.7%
3.51 57.51 99.9%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
0.00 Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy SILT (ML) brown, wet
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air-Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 100.30
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan Sieve Continuity
B23 of 49
Project No.
Testing Date
24TP11-5 Sample No. 9 Depth (ft) 5.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy SILT (ML) brown, wet
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 Mass of Air-Dried Soil (g) 114.10 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 114.10
Composite Correction 6
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 24.5 22.5 12.3 0.0325 16.1% 16.1%
5 20.0 22.5 13.0 0.0212 12.1% 12.1%
15 16.0 22.5 13.7 0.0125 8.7% 8.7%
30 14.5 22.5 13.9 0.0089 7.4% 7.4%
60 13.5 22.5 14.1 0.0064 6.5% 6.5%
90 13.0 22.5 14.2 0.0052 6.1% 6.1%
120 12.5 22.5 14.3 0.0045 5.6% 5.6%
240 12.0 23.0 14.3 0.0032 5.2% 5.2%
480 11.5 23.0 14.4 0.0022 4.8% 4.8%
1440 11.0 21.0 14.5 0.0013 4.3% 4.3%
HYDROMETER
Corrected Dry Mass (g)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001 % Passing
Particle Diameter (mm)
Gradation Curve
B24 of 49
Project No.
Testing Date
24TP14‐4 Sample No. 3 Depth (ft) 4.0
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 52.95 52.95
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
52.95 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 52.95
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 52.95 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
52.95 Post Wash ID 118
Dry Mass Post Wash
(g) 21.35
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
1.79 1.79 3.4% 96.6% 96.6%
3.31 5.10 9.6% 90.4% 90.4%
6.02 11.12 21.0% 79.0% 79.0%
5.33 16.45 31.1% 68.9% 68.9%
3.97 20.42 38.6% 61.4% 61.4%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY (CL): yelllow brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 52.95
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B25 of 49
Project No.
Testing Date
24TP14‐4 Sample No. 3 Depth (ft) 4.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY (CL): yelllow brown, moist
0.19 20.61 103.6%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 52.95 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 52.95
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 33.0 21.0 10.9 0.0310 54.2% 54.2%
5 31.0 21.0 11.2 0.0199 50.5% 50.5%
15 28.0 21.0 11.7 0.0117 44.9% 44.9%
30 26.0 21.0 12.0 0.0084 41.1% 41.1%
60 24.0 21.0 12.4 0.0060 37.4% 37.4%
90 22.0 21.0 12.7 0.0050 33.7% 33.7%
120 21.5 21.0 12.8 0.0043 32.7% 32.7%
240 20.0 21.0 13.0 0.0031 29.9% 29.9%
480 19.0 21.0 13.2 0.0022 28.0% 28.0%
1440 15.5 20.0 13.8 0.0013 21.5% 21.5%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B26 of 49
Project No.
Testing Date
24TP14‐7 Sample No. 5 Depth (ft) 3.5
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 51.24 51.24
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
51.24 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 51.24
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 51.24 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
51.24 Post Wash ID 116
Dry Mass Post Wash
(g) 1.27
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
0.12 0.12 0.2% 99.8% 99.8%
0.11 0.23 0.4% 99.6% 99.6%
0.13 0.36 0.7% 99.3% 99.3%
0.30 0.66 1.3% 98.7% 98.7%
0.58 1.24 2.4% 97.6% 97.6%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): yelllow brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 51.24
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B27 of 49
Project No.
Testing Date
24TP14‐7 Sample No. 5 Depth (ft) 3.5
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): yelllow brown, moist
0.03 1.27 100.0%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 51.24 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 51.24
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 52.0 21.0 7.8 0.0262 92.7% 92.7%
5 47.0 21.0 8.6 0.0174 83.1% 83.1%
15 40.0 21.0 9.7 0.0107 69.6% 69.6%
30 36.0 21.0 10.4 0.0078 61.8% 61.8%
60 32.0 21.0 11.1 0.0057 54.1% 54.1%
90 30.0 21.0 11.4 0.0047 50.2% 50.2%
120 29.0 21.0 11.5 0.0041 48.3% 48.3%
240 26.0 21.0 12.0 0.0030 42.5% 42.5%
480 25.0 21.0 12.2 0.0021 40.6% 40.6%
1440 20.0 20.0 13.0 0.0013 30.9% 30.9%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B28 of 49
Project No.
Testing Date
24TP14‐11 Sample No. 8 Depth (ft) 2.5
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 53.32 53.32
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
53.32 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 53.32
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 53.32 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
51.24 Post Wash ID 103
Dry Mass Post Wash
(g) 10.00
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
1.06 1.06 2.1% 97.9% 97.9%
2.44 3.50 6.8% 93.2% 93.2%
3.42 6.92 13.5% 86.5% 86.5%
1.87 8.79 17.2% 82.8% 82.8%
1.10 9.89 19.3% 80.7% 80.7%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY with sand (CL): yelllow brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 53.32
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B29 of 49
Project No.
Testing Date
24TP14‐11 Sample No. 8 Depth (ft) 2.5
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY with sand (CL): yelllow brown, moist
0.04 9.93 100.7%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 51.24 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 51.24
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 47.0 21.0 8.6 0.0275 83.1% 83.1%
5 44.0 21.0 9.1 0.0179 77.3% 77.3%
15 42.0 21.0 9.4 0.0105 73.4% 73.4%
30 40.0 21.0 9.7 0.0076 69.6% 69.6%
60 37.0 21.0 10.2 0.0055 63.8% 63.8%
90 36.0 21.0 10.4 0.0045 61.8% 61.8%
120 34.0 21.0 10.7 0.0040 58.0% 58.0%
240 31.0 21.0 11.2 0.0029 52.2% 52.2%
480 28.0 21.0 11.7 0.0021 46.4% 46.4%
1440 22.0 20.0 12.7 0.0013 34.8% 34.8%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B30 of 49
0 10
20 30
40 50
60 70
80 0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT, LL
ML or OL
MH or OH
CL or OL
CH or OH
ATTERBERG LIMITS
PLASTICITY INDEX, PI
CL-ML
"A" LINE
31 26
24 21
24TP06-01
24TP06-07
24TP06-09
24TP11-05
Boring
Number
MC
(%)
8 8
2 3
23 18
22 18
4.0 3.0
3.0 5.0
1 5
6 9
Sample ID Depth
(ft) PL
30 22
29 28
Test
Symbol
Fines
(%) LL PI Classification
SILT (ML)
SILTY CLAY (CL-ML)
SANDY SILT (ML)
SANDY SILT (ML)
--
--
--
--
YEH ATTERBERG 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
1 of 1
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B31 of 49
CTL Number: Date: 4/19/2024
Client Name: By: RU
24TP2-04
20 Gray Organic
SILT w/ Sand
& Gravel
75.17 131.42128.71114.74
5.1 73.926.1
Note:
Moisture Content (%)
Organic Material (%)
ASTM provides no guidelines for including information about the organic content of a sample in the description when the wet/dry liquid limit data is not available. CTL developed the following guidelines to fill this gap:
Ash Content (%)
0-5%: The organics are either not mentioned or mentioned as being "trace". 5-15%: The soil is considered as inorganic and is classified, as per ASTM 2487, with "with organics" included in the description. 15-50%: The soil is considered as organic and is described, per ASTM 2487. > 50%: The soil is described as "Peat".
SMWWTP Ponds
Project Number: 223-184
687-219
Yeh and Associates
Furnace Dry wt. (440oC) (g)
Dish Number
Dish weight (g)
Soil, Org, Dish & H2O (g)
Project Name:
Visual Description
Boring
Sample
Depth (ft)
Oven Dry wt (110oC) (g)
Organic Content Test
ASTM D 2974-20 (Method A - 440 oC)
B32 of 49
CTL Number: Date: 6/3/2024
Client Name: By: RU
24TP4-01 24TP4-01 24TP4-02 24TP6-06 24TP8-01
10 11 12 7 16
03304
Gray Peat Yellowish
Brown Silty
SAND w/
Gravel
Yellowish
Brown Silty
SAND w/
Gravel
Gray Organic
Clay
Yellowish
Brown Silty
SAND w/
Gravel
77.02 75.77 74.33 80.20 74.90
110.73 266.23 260.71 99.06 270.23107.00 238.47 233.31 98.30 254.65
90.06 236.99 232.64 92.75 253.62
12.4 17.1 17.2 4.2 8.7
43.5 99.1 99.6 69.3 99.456.5 0.9 0.4 30.7 0.6
Note:
Moisture Content (%)
Organic Material (%)
ASTM provides no guidelines for including information about the organic content of a sample in the description when the wet/dry liquid limit data is not available. CTL developed the following guidelines to fill this gap:
Ash Content (%)
0-5%: The organics are either not mentioned or mentioned as being "trace". 5-15%: The soil is considered as inorganic and is classified, as per ASTM 2487, with "with organics" included in the description. 15-50%: The soil is considered as organic and is described, per ASTM 2487. > 50%: The soil is described as "Peat".
SMWWTP-Ponds 4,6,8,11
Project Number: 223-184
687-224
Yeh & Associates
Furnace Dry wt. (440oC) (g)
Dish Number
Dish weight (g)
Soil, Org, Dish & H2O (g)
Project Name:
Visual Description
Boring
Sample
Depth (ft)
Oven Dry wt (110oC) (g)
Organic Content Test
ASTM D 2974-20 (Method A - 440 oC)
B33 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 8.2 6.7 1.4E-06
SAMPLE IMAGES
1.4 11.5 8.2 6.7 1.4E-06
6 7/11/24 151 23.2 1.4
1.4E-06
4 7/11/24 152 23.2 1.4 11.5 8.2 6.7 1.4E-06
6.7 1.4E-06
3 7/11/24 151 23.2 1.4 11.5 8.2 6.7
8.2 6.7 1.4E-06
2 7/11/24 152 23.2 1.4 11.5 8.2
μ, ksf io if kt, cm/s
1 7/11/24 151 23.2 1.4 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 151 23.2
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.87 0.87 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.3E-06
Deaired Tap-Water
Saturation, % 57% 85% Pipette Area, cm2 0.0314
Water Content, % 19.1% 28.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 86.6 86.6 Permeant
Mass, g 622.45 672.88
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
4" of poorly-graded SAND (SP with
1" of lean CLAY (CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
20 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E4-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
58A 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B34 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 18.5 17.5 2.5E-07
SAMPLE IMAGES
1.4 10.1 18.5 17.5 2.4E-07
6 7/11/24 240 22.8 1.4
2.5E-07
4 7/11/24 240 22.8 1.4 10.1 18.5 17.5 2.5E-07
17.5 2.5E-07
3 7/11/24 241 22.8 1.4 10.1 18.5 17.5
18.5 17.5 2.5E-07
2 7/11/24 238 22.8 1.4 10.1 18.5
μ, ksf io if kt, cm/s
1 7/11/24 237 22.8 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 242 22.8
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.57 0.57 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 2.3E-07
Deaired Tap-Water
Saturation, % 52% 85% Pipette Area, cm2 0.0314
Water Content, % 11.6% 18.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 103.1 103.1 Permeant
Mass, g 694.67 739.23
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Sandy lean CLAY (CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E6-02
CLASSIFICATION
Sieve Size % Passing Other Parameters
41A 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B35 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.5 1.2 1.2E-05
SAMPLE IMAGES
1.4 10.1 1.5 1.2 1.2E-05
6 7/9/24 2100 22.4 1.4
1.2E-05
4 7/9/24 1200 22.4 1.4 10.1 1.5 1.3 1.2E-05
1.3 1.2E-05
3 7/9/24 1200 22.4 1.4 10.1 1.5 1.3
1.5 1.3 1.2E-05
2 7/9/24 1200 22.4 1.4 10.1 1.5
μ, ksf io if kt, cm/s
1 7/9/24 1200 22.4 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/9/24 2100 22.4
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.63 0.63 kavg 20ºC, cm/s 1.1E-05
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 81% 99% Pipette Area, cm2 0.263
Water Content, % 19.4% 23.9%
TEST SUMMARYSample Type MCA
Dry Density, pcf 99.7 99.7 Permeant
Mass, g 719.19 746.00
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND with silt (SP-SM) with lean CLAY (CL) seams:
light brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E6-03
CLASSIFICATION
Sieve Size % Passing Other Parameters
47 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B36 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 8.2 6.2 2.7E-06
SAMPLE IMAGES
1.4 10.1 8.2 6.2 2.7E-06
6 7/11/24 111 22.8 1.4
2.7E-06
4 7/11/24 111 22.8 1.4 10.1 8.2 6.2 2.7E-06
6.2 2.7E-06
3 7/11/24 112 22.8 1.4 10.1 8.2 6.2
8.2 6.2 2.7E-06
2 7/11/24 111 22.8 1.4 10.1 8.2
μ, ksf io if kt, cm/s
1 7/11/24 112 22.8 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 111 22.8
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.64 0.64 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 2.5E-06
Deaired Tap-Water
Saturation, % 97% 88% Pipette Area, cm2 0.0314
Water Content, % 23.7% 21.8%
TEST SUMMARYSample Type MCA
Dry Density, pcf 98.9 98.9 Permeant
Mass, g 739.15 727.37
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Sandy lean CLAY CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E14-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B37 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.5 0.6 1.0E-02
SAMPLE IMAGES
1.4 10.1 1.5 0.6 1.0E-02
6 7/9/24 10 22.4 1.4
1.0E-02
4 7/9/24 20 22.4 1.4 10.1 1.8 0.3 1.0E-02
0.3 1.0E-02
3 7/9/24 20 22.4 1.4 10.1 1.8 0.3
1.8 0.3 1.0E-02
2 7/9/24 20 22.4 1.4 10.1 1.8
μ, ksf io if kt, cm/s
1 7/9/24 20 22.4 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/9/24 10 22.4
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.60 0.60 kavg 20ºC, cm/s 9.6E-03
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 30% 96% Pipette Area, cm2 0.263
Water Content, % 7.1% 22.2%
TEST SUMMARYSample Type MCA
Dry Density, pcf 101.1 101.1 Permeant
Mass, g 653.72 746.42
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): light
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
25.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E14-02
CLASSIFICATION
Sieve Size % Passing Other Parameters
14 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B38 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP2-2
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit ---
2.00 #
4 (4.75mm) --- Plastic Limit ---
Poorly-graded SAND with silt (SP-SM): red yelllow with black staining, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.67
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 793.25 829.81
Water Content, % 20.4% 25.9%
TEST SUMMARYSample Type MCA
Dry Density, pcf 96.2 96.2 Permeant Deaired Tap-Water
Saturation, % 74% 95% Pipette Area, cm2 0.263
Void Ratio 0.73 0.73 kavg 20ºC, cm/s 1.9E-03
Diameter, in 2.42 2.42 Tested By ND
Height, in 5.67 5.67
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Volume, in3 26.09 26.09
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/16/24 60 19.5
μ, ksf io if kt, cm/s
1 4/16/24 60 19.5 0.6 11.5 1.1 0.5 1.7E-03
2 4/16/24 60 19.5 0.6 11.5 1.1
3 4/16/24 60 19.5 0.6 11.5
0.6 11.5 1.1 0.4 1.9E-03
0.4 1.9E-03
1.1 0.4
6 4/16/24 60 19.5 0.6
1.9E-03
4 4/16/24 60 19.5
11.5 1.1 0.4 1.9E-03
SAMPLE IMAGES
0.6 11.5 1.1 0.4 1.9E-03
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B39 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
TempAvg, ºC σ', ksf μ, ksf io REMARKS
Test Method: ASTM D5084 (Method C)
kt, cm/s
0.6 1.0 0.6
0.6 11.5 1.0 0.6
1.0 0.6
1.0 120
4/16/24
1.0 0.6 6.3E-04
6.3E-04
6.3E-04
if
SAMPLE IMAGES
5 4/16/24
0.6 19.3 0.6 11.5
19.3 0.6 11.5
6.3E-04
19.3 MCA
ND
120 0.6 11.5
6.3E-04
0.6 11.5 6.3E-04
120 0.6 11.5 1.0
4 120
19.3 2 4/16/24 120 19.3
4/16/24 19.3
PERMEATION DATA
Trial Date Time, sec
3 6 4/16/24 120
1 4/16/24
Volume, in3 25.99 25.99
kavg 20ºC, cm/s 6.4E-04
Area, in2 4.52 4.52
Diameter, in 2.40 2.40 Tested By TEST SUMMARY
Void Ratio 0.63
5.75 5.75
Dry Density, pcf 102.5 102.5 Deaired Tap-Water
Saturation, % 89% 100% 0.263
Water Content, % 20.8% 23.3% Sample Type
844.67 862.60
#
200 (0.075mm)
Mass, g
---
Silty SAND (SM): red yelllow with
black staining, moist
SAMPLE PROPERTIES
Intial Final
#
100 (0.150mm) ---
0.63 Permeant
Pipette Area, cm2
Height, in
---
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.67
--- Plastic Limit
% Passing Other Parameters
1 3/8-in. (9.5mm) --- Liquid Limit ---
24TP2-4
CLASSIFICATION
Sieve Size
2.00 #
4 (4.75mm)
SAMPLE ID
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B40 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.8 0.3 9.7E-03
SAMPLE IMAGES
1.4 10.1 1.8 0.3 9.6E-03
6 7/10/24 20 22.5 1.4
9.7E-03
4 7/10/24 15 22.5 1.4 10.1 1.5 0.4 9.7E-03
0.4 9.7E-03
3 7/10/24 15 22.5 1.4 10.1 1.5 0.4
1.5 0.4 9.6E-03
2 7/10/24 15 22.5 1.4 10.1 1.5
μ, ksf io if kt, cm/s
1 7/10/24 15 22.5 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/10/24 20 22.5
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.61 0.61 kavg 20ºC, cm/s 9.1E-03
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 45% 90% Pipette Area, cm2 0.263
Water Content, % 10.6% 21.2%
TEST SUMMARYSample Type MCA
Dry Density, pcf 100.6 100.6 Permeant
Mass, g 671.69 736.09
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): gray
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E4-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
61 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B41 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 9.5 7.7 1.2E-06
SAMPLE IMAGES
0.6 11.5 9.5 7.7 1.2E-06
6 5/29/24 156 21.2 0.6
1.2E-06
4 5/29/24 156 21.2 0.6 11.5 9.5 7.7 1.2E-06
7.7 1.2E-06
3 5/29/24 156 21.2 0.6 11.5 9.5 7.7
9.5 7.7 1.2E-06
2 5/29/24 156 21.2 0.6 11.5 9.5
μ, ksf io if kt, cm/s
1 5/29/24 158 21.2 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/29/24 156 21.2
Volume, in3 20.04 20.04
Height, in 4.36 4.36 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.88 0.88 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.2E-06
Deaired Tap-Water
Saturation, % 96% 100% Pipette Area, cm2 0.0314
Water Content, % 30.3% 31.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 92.5 92.5 Permeant
Mass, g 633.97 640.95
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Lean CLAY (CL): olive brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.79
---
4 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-1
CLASSIFICATION
Sieve Size % Passing Other Parameters
1 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B42 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 1.4 0.3 1.3E-02
SAMPLE IMAGES
0.6 11.5 1.4 0.3 1.3E-02
6 5/31/24 15 21.8 0.6
1.3E-02
4 5/31/24 15 21.8 0.6 11.5 1.4 0.3 1.3E-02
0.3 1.4E-02
3 5/31/24 15 21.8 0.6 11.5 1.4 0.3
1.4 0.3 1.3E-02
2 5/31/24 15 21.8 0.6 11.5 1.4
μ, ksf io if kt, cm/s
1 5/31/24 15 21.8 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 15 21.8
Volume, in3 25.04 25.02
Height, in 5.44 5.44
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.56 0.56 kavg 20ºC, cm/s 1.3E-02
Diameter, in 2.42 2.42 Tested By ND
Deaired Tap-Water
Saturation, % 34% 95% Pipette Area, cm2 0.263
Water Content, % 7.4% 20.5%
TEST SUMMARYSample Type MCA
Dry Density, pcf 103.8 103.8 Permeant
Mass, g 732.71 821.82
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): red
yellow, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
3.50 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-6
CLASSIFICATION
Sieve Size % Passing Other Parameters
3 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B43 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 15.5 14.2 5.5E-07
SAMPLE IMAGES
0.6 11.5 15.5 14.2 5.5E-07
6 5/31/24 200 21.8 0.6
5.6E-07
4 5/31/24 199 21.8 0.6 11.5 15.5 14.2 5.5E-07
14.2 5.7E-07
3 5/31/24 197 21.8 0.6 11.5 15.5 14.2
15.5 14.2 5.8E-07
2 5/31/24 194 21.8 0.6 11.5 15.5
μ, ksf io if kt, cm/s
1 5/31/24 188 21.8 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 199 21.8
Volume, in3 27.14 27.14
Height, in 6.00 6.00 Tested By GF
Area, in2 4.52 4.52
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.69 0.69 Annulus Area, cm2 0.7671
Diameter, in 2.40 2.40 kavg 20ºC, cm/s 5.4E-07
Deaired Tap-Water
Saturation, % 84% 96% Pipette Area, cm2 0.0314
Water Content, % 21.4% 24.6%
TEST SUMMARYSample Type MCA
Dry Density, pcf 99.8 99.8 Permeant
Mass, g 863.09 885.38
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Lean CLAY (CL): yellowish brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.7
---
3 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-7
CLASSIFICATION
Sieve Size % Passing Other Parameters
5 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B44 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 1.8 1.0 7.1E-04
SAMPLE IMAGES
0.6 11.5 1.8 1.0 7.1E-04
6 5/31/24 90 21.9 0.6
7.1E-04
4 5/31/24 90 21.9 0.6 11.5 1.8 1.0 7.1E-04
1.0 7.0E-04
3 5/31/24 90 21.9 0.6 11.5 1.8 1.0
1.8 1.0 7.1E-04
2 5/31/24 90 21.9 0.6 11.5 1.8
μ, ksf io if kt, cm/s
1 5/31/24 90 21.9 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 90 21.9
Volume, in3 23.02 23.02
Height, in 5.01 5.01
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.78 0.78 kavg 20ºC, cm/s 6.8E-04
Diameter, in 2.42 2.42 Tested By ND
Deaired Tap-Water
Saturation, % 98% 100% Pipette Area, cm2 0.263
Water Content, % 29.1% 29.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 92.4 92.4 Permeant
Mass, g 720.97 724.54
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
SILT (ML): yewwlow brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.64
---
3.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-9
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B45 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP11-5
CLASSIFICATION
Sieve Size % Passing Other Parameters
9 3/8-in. (9.5mm) --- Liquid Limit ---
5.00 #
4 (4.75mm) --- Plastic Limit ---
Sandy SILT (ML): brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 652.05 659.68
Water Content, % 28.4% 30.0%
TEST SUMMARYSample Type MCA
Dry Density, pcf 89.4 89.4 Permeant Deaired Tap-Water
Saturation, % 91% 96% Pipette Area, cm2 0.263
Void Ratio 0.82 0.82 kavg 20ºC, cm/s 6.8E-04
Diameter, in 2.42 2.42 Tested By ND
Height, in 4.70 4.70
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Volume, in3 21.64 21.64
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/29/24 180 21.2
μ, ksf io if kt, cm/s
1 5/29/24 180 21.2 0.6 11.5 1.3 0.4 6.9E-04
2 5/29/24 180 21.2 0.6 11.5 1.3
3 5/29/24 180 21.2 0.6 11.5
0.6 11.5 1.3 0.4 7.0E-04
0.4 7.0E-04
1.3 0.4
6 5/29/24 180 21.2 0.6
7.0E-04
4 5/29/24 180 21.2
11.5 1.3 0.4 7.0E-04
SAMPLE IMAGES
0.6 11.5 1.3 0.4 7.0E-04
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B46 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-4
3 4
TempAvg, ºC
Sandy lean CLAY (CL): yelllow
brown, moist
5.26 4.52
23.80 24.2%
101.8
100%
0.66 kt σ', ksf μ, ksf , cm/s
Permeant
Pipette Area, cm2
kavg 20ºC, cm/s
Annulus Area, cm2
REMARKS
16.2 5.0E-07
5.1E-07
5.1E-07
16.2 16.2
5.1E-07
5.0E-07
0.6 if
16.2 16.2
16.2 0.6 11.5 17.6
17.6 17.6
11.5 11.5
11.5 17.6
17.6 Void Ratio
Diameter, in
Tested By ND
4.52 Test Method: ASTM D5084 (Method F)
2.40 5.26
23.80 772.64
0.6 0.6
0.6 11.5 5.1E-07
Date Time, sec
SAMPLE PROPERTIES
Intial Final
Mass, g
Water Content, %
Dry Density, pcf
Saturation, %
Height, in
Area, in2
Volume, in3
21.5%
101.8
5 4/16/24
188
4/16/24 191
Trial
4/16/24 190
189
6 20.3
4/16/24
3 20.3
20.3 20.3
4/16/24 190 20.3
SAMPLE IMAGES
2 1 4/16/24 192 17.6
PERMEATION DATA
io
4 20.3
0.6 11.5
#
100 (0.150mm)
Sample Type
#
200 (0.075mm)
---
---
TEST SUMMARY
MCA
Deaired Tap-Water
0.0314
5.0E-07
0.7671
89%
0.66 2.40
789.34
CLASSIFICATION
Sieve Size % Passing Other Parameters
3/8-in. (9.5mm) Liquid Limit ---
---
---
2.7 Plastic Limit
Plasticity Index #
16 (1.18mm)
#
30 (0.6mm)
---
--- #
4 (4.75mm)
---
---
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B47 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-7
CLASSIFICATION
Sieve Size % Passing Other Parameters
5 3/8-in. (9.5mm) --- Liquid Limit ---
3.5 #
4 (4.75mm) --- Plastic Limit ---
Lean CLAY (CL): yelllow brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.84
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 823.70 830.62
Water Content, % 32.2% 33.3%
TEST SUMMARYSample Type MCA
Dry Density, pcf 91.2 91.2 Permeant Deaired Tap-Water
Saturation, % 97% 100% Pipette Area, cm2 0.0314
Void Ratio 0.94 0.94 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.9E-07
Height, in 5.66 5.66 Tested By ND
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Volume, in3 26.03 26.03
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/17/24 190 21.8
μ, ksf io if kt, cm/s
1 4/17/24 152 21.8 0.6 11.5 16.4 15.9 2.2E-07
2 4/17/24 162 21.8 0.6 11.5 16.4
3 4/17/24 188 21.8 0.6 11.5
0.6 11.5 16.4 15.9 1.8E-07
15.9 2.0E-07
16.4 15.9
6 4/17/24 189 21.8 0.6
1.8E-07
4 4/17/24 181 21.8
11.5 16.4 15.9 1.7E-07
SAMPLE IMAGES
0.6 11.5 16.4 15.9 1.7E-07
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B48 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-11
CLASSIFICATION
Sieve Size % Passing Other Parameters
8 3/8-in. (9.5mm) --- Liquid Limit ---
2.5 #
4 (4.75mm) --- Plastic Limit ---
Lean CLAY with sand (CL): yelllow
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.73
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 682.12 696.59
Water Content, % 29.2% 32.0%
TEST SUMMARYSample Type MCA
Dry Density, pcf 90.8 90.8 Permeant Deaired Tap-Water
Saturation, % 91% 100% Pipette Area, cm2 0.0314
Void Ratio 0.88 0.88 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.8E-07
Height, in 4.82 4.82 Tested By ND
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Volume, in3 22.15 22.15
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/16/24 141 19.9
μ, ksf io if kt, cm/s
1 4/16/24 195 19.9 0.6 11.5 19.3 18.7 1.4E-07
2 4/16/24 162 19.9 0.6 11.5 19.3
3 4/16/24 140 19.9 0.6 11.5
0.6 11.5 19.3 18.7 2.1E-07
18.7 1.7E-07
19.3 18.7
6 4/16/24 148 19.9 0.6
2.0E-07
4 4/16/24 132 19.9
11.5 19.3 18.7 1.9E-07
SAMPLE IMAGES
0.6 11.5 19.3 18.7 2.0E-07
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B49 of 49
APPENDIX C – HISTORICAL AERIAL PHOTOS
The EDR Aerial Photo Decade Package
Santa Maria Waste Water Treatment Plant 601 Black Road Santa Maria, CA 93458 Inquiry Number: January 09, 2024 7536673.1 6 Armstrong Road, 4th floor
Shelton, CT 06484
Toll Free: 800.352.0050
www.edrnet.com
C1 of 18
2020 1"=875' Flight Year: 2020 USDA/NAIP
2016 1"=875' Flight Year: 2016 USDA/NAIP
2012 1"=875' Flight Year: 2012 USDA/NAIP
2009 1"=875' Flight Year: 2009 USDA/NAIP
2006 1"=875' Flight Year: 2006 USDA/NAIP
2002 1"=875' Flight Date: June 04, 2002 USGS
1994 1"=875' Acquisition Date: January 01, 1994 USGS/DOQQ 1981 1"=875' Flight Date: October 18, 1981 USDA
1978 1"=875' Flight Date: September 22, 1978 USGS
1975 1"=875' Flight Date: December 01, 1975 USGS
1967 1"=875' Flight Date: June 27, 1967 USGS
1960 1"=875' Flight Date: April 01, 1960 USGS
1954 1"=875' Flight Date: February 21, 1954 USDA
1949 1"=875' Flight Date: March 28, 1949 USDA
1943 1"=875' Flight Date: September 21, 1943 USDA
1938 1"=875' Flight Date: January 22, 1938 FAIR
EDR Aerial Photo Decade Package 01/09/24 Santa Maria Waste Water Treatment Plant Site Name: Client Name: Yeh and Associates 601 Black Road 391 Front Street,Suite D Santa Maria, CA 93458 Grover Beach, CA 93433 EDR Inquiry # 7536673.1 Contact: Luke Salemme Environmental Data Resources, Inc. (EDR) Aerial Photo Decade Package is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities. EDR’s professional researchers provide digitally reproduced historical aerial photographs, and when available, provide one photo per decade. Search Results: Year Scale Details Source
When delivered electronically by EDR, the aerial photo images included with this report are for ONE TIME USE ONLY. Further reproduction of these aerial photo images is prohibited without permission from EDR. For more information contact your EDR Account Executive. Disclaimer - Copyright and Trademark Notice Copyright 2024 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission.
EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, LLC or its affiliates. All other trademarks used herein are the property of their respective owners. 7536673 - 1 page 2 This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, LLC. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. This Report is provided on an “AS IS”, “AS AVAILABLE” basis. NO WARRANTY EXPRESS OR IMPLIED IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT.
ENVIRONMENTAL DATA RESOURCES, LLC AND ITS SUBSIDIARIES, AFFILIATES AND THIRD PARTY SUPPLIERS DISCLAIM ALL WARRANTIES, OF ANY
KIND OR NATURE, EXPRESS OR IMPLIED, ARISING OUT OF OR RELATED TO THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN
THIS REPORT, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES REGARDING ACCURACY, QUALITY, CORRECTNESS, COMPLETENESS,
COMPREHENSIVENESS, SUITABILITY, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE, NON-INFRINGEMENT, MISAPPROPRIATION, OR OTHERWISE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, LLC OR ITS
SUBSIDIARIES, AFFILIATES OR THIRD PARTY SUPPLIERS BE LIABLE TO ANYONE FOR ANY DIRECT, INCIDENTAL, INDIRECT, SPECIAL,
CONSEQUENTIAL OR OTHER DAMAGES OF ANY TYPE OR KIND (INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS, LOSS OF USE, OR LOSS OF DATA), ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN THIS REPORT.
Any analyses, estimates, ratings, environmental risk levels, or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only an assessment performed by a qualified environmental professional can provide findings, opinions or conclusions regarding the environmental risk or conditions in, on or at any property.
C2 of 18
7536673.1 2020 = 875'
C3 of 18
7536673.1 2016 = 875'
C4 of 18
7536673.1 2012 = 875'
C5 of 18
7536673.1 2009 = 875'
C6 of 18
7536673.1 2006 = 875'
C7 of 18
7536673.1 2002 = 875'
C8 of 18
7536673.1 1994 = 875'
C9 of 18
7536673.1 1981 = 875'
C10 of 18
7536673.1 1978 = 875'
C11 of 18
7536673.1 1975 = 875'
C12 of 18
7536673.1 1967 = 875'
C13 of 18
7536673.1 1960 = 875'
C14 of 18
7536673.1 1954 = 875'
C15 of 18
7536673.1 1949 = 875'
C16 of 18
7536673.1 1943 = 875'
C17 of 18
7536673.1 1938 = 875'
C18 of 18
APPENDIX D – PREVIOUS STUDIES AND PERTINENT DATA
D1 of 179
D2 of 179
D3 of 179
D4 of 179
D5 of 179
D6 of 179
D7 of 179
D8 of 179
D9 of 179
D10 of 179
D11 of 179
D12 of 179
D13 of 179
D14 of 179
D15 of 179
D16 of 179
D17 of 179
D18 of 179
D19 of 179
D20 of 179
D21 of 179
D22 of 179
D23 of 179
D24 of 179
D25 of 179
D26 of 179
D27 of 179
D28 of 179
D29 of 179
D30 of 179
D31 of 179
D32 of 179
D33 of 179
D34 of 179
D35 of 179
D36 of 179
D37 of 179
D38 of 179
D39 of 179
D40 of 179
D41 of 179
D42 of 179
D43 of 179
D44 of 179
D45 of 179
`
D46 of 179
`
D47 of 179
`
D48 of 179
SANDSTONE
Paving and/or Base Materials
Silty SAND (SM)
Silty CLAY (CL-ML)
MATERIAL DESCRIPTION
C
O
A
R
S
E
G
R
A
I
N
E
D
Poorly graded SAND (SP)
4 11
SYMBOL
PLATE A-1
Thin-walled Tube, pushed
R
O
C
K
F
I
N
E
G
R
A
I
N
E
D
3 CONGLOMERATE
Poorly graded GRAVEL (GP)
MUDSTONE
5 9
7 ANDESITE BRECCIA
Hand Auger Sample
SAMPLE NO.
MATERIAL
Fat CLAY (CH)
Well graded SAND (SW)
SILTSTONE
10 Project No. 3045.053
Carollo Engineers
Sonic Soil Core Sample
6 (25)
13 Symbol for:
No Sample Recovered
BASALT
Lexan Sample
Pitcher Sample
Vibracore Sample
CA Liner Sampler, driven
25 CA Liner Sampler, Bagged
KEY TO TERMS & SYMBOLS USED ON LOGS
1 SPT Sampler, driven
11 3 CA Liner Sampler, disturbed
(unless otherwise noted in report text) are as follows:
Sloped line in symbol column indicates
transitional boundary
General Notes
Soil Texture Symbol
Samplers and sampler dimensions
m = Miniature Vane
12 -12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 SURFACE EL: Using local, MSL, MLLW or other datum
Water Level Symbols
Length of sample symbol approximates
recovery length
Strength Legend
Classification of Soils per ASTM D2487
or D2488
Geologic Formation noted in bold font at
the top of interpreted interval
Blow counts for California Liner Sampler
shown in ( )
25 Blows/ft Description
REC"/DRIVE"
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
1-3/8" ID, 2" OD
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
25 blows drove sampler 12" after
initial 6" of seating
86/11"
50/6"
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50 blows drove sampler 6" after
initial 6" of seating
Ref/3" 50 blows drove sampler 3" during
initial 6" seating interval
ELEVATION, ft
6 18"/
30"
8 DEPTH, ft
20"/
24"
30"/
30"
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:00 p 10 12
CME Core Sample
4 t = Torvane
20"/
24"
Lean CLAY (CL)
Bulk Bag Sample (from cuttings)
Final ground water level
Seepages encountered
Initial or perched water level
u = Unconsolidated Undrained Triaxial
Q = Unconfined Compression
p = Pocket Penetrometer
Sampler Driving Resistance
CLAYSTONE
LOCATION:
(25)
(25)
Elastic SILT (MH)
(25)
Silty, Clayey SAND (SC-SM)
2-7/8" ID, 3" OD
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 BLOW COUNT /
Well graded GRAVEL (GW)
The drill hole location referencing local
landmarks or coordinates
Clayey SAND (SC)
SAMPLES
7 8
1 9
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
13 5
2 SILT (ML)
D49 of 179
5 Poorly-graded SAND (SP): dense, brown, moist
Silty SAND (SM): medium dense, brown, moist
SILT (ML): medium stiff, brown, moist
Poorly-graded SAND (SP): medium dense, brown,
moist
Poorly-graded SAND with gravel (SP): loose, brown,
moist, approximate 10" thick layer of well graded
sand with gravel (SW) in bottom of sampler
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
3 3
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 11 3
4 6
4 3
1 2
8 ALLUVIUM (Qal)
Silty SAND (SM): loose, light brown, moist, organics,
roots
93 (15)
20 (41)
7 (19)
35 97
106
110
103
(15)
94 4
94 9
100
106
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 50.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
A
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-1
Approximately 30' east of access road in
field west of Black Rd. Proposed primary
clarifier.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf B
5 6
7 8
9 p 2.0
SAMPLERS
MATERIAL DESCRIPTION
BACKFILLED WITH: Cuttings
UNIT WET
WEIGHT, pcf
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
LIQUID
LIMIT, %
PLASTICITY
UNIT DRY
INDEX, %
WEIGHT, pcf
PLATE A-2a
DEPTH TO WATER: Not Encountered DEPTH, ft 2
4 6
8 10
12 14
16 18
20 22
24 26
28 30
32 34
36 38
40 D50 of 179
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
PLATE A-2b
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
5 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a DEPTH TO WATER: Not Encountered
- medium dense, light brown, increase in grain size
- dense, decrease in grain size
(44) 103
39 10
11 SAMPLERS
LIQUID
LIMIT, %
108
SAMPLER
BLOW COUNT
UNIT WET
WEIGHT, pcf
44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-1
SAMPLE NO.
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Approximately 30' east of access road in
field west of Black Rd. Proposed primary
clarifier.
ELEVATION, ft
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
MATERIAL
SYMBOL
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 50.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
D51 of 179
108
108
37 1 3
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a A
3 4
5 6
SAMPLERS
3 18
7 8
ALLUVIUM (Qal)
Silty SAND (SM): medium dense, brown, dry to moist
- moist
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
SILT (ML): medium stiff, brown, moist, orange
staining, gray mottling
- soft, with 4-inch layer of sandy silt (ML), wet
Poorly-graded SAND (SP): medium dense, brown,
moist
114
2 111
92 102
(29)
10 (9)
3 (38)
- dense
BACKFILLED WITH: Cuttings
% PASSING
#200 SIEVE
LIQUID
LIMIT, %
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
UNIT WET
WEIGHT, pcf
MATERIAL DESCRIPTION
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
LOG OF BORING NO. B-2
DRILLING DATE: August 31, 2006
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 25.5 ft
Carollo Engineers
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
DEPTH TO WATER: Wet soil noted
PLATE A-3
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
UNIT DRY
WEIGHT, pcf
Project No. 3045.053
SAMPLER
BLOW COUNT
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
SAMPLE NO.
Approximately 25' east of access road in
field west of Black Rd. Proposed primary
trickling filter.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
D52 of 179
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a - medium dense
Poorly-graded SAND (SP): very dense, light brown,
moist
- firmer drilling starting at approximately 32'
- SILT (ML) layer 2' thick
- brown
Poorly-graded SAND with silt (SP-SM): medium
dense, light brown, moist
Clayey SILT (ML): soft, brown, moist
- wet zone of soil between 15' and 17'
3 1
5 8
35 30
4 Clayey SAND (SC): loose, brown, moist
4 25
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
SILT (ML): medium stiff, brown, moist
29 107
6 (13)
(10)
101
103
29 (82)
18 (19)
116
79 3
97 112
5 95
ELEVATION, ft
% PASSING
#200 SIEVE
COMPLETION DEPTH: 51.0 ft
LOCATION:
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
WATER
CONTENT, %
MATERIAL
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
BACKFILLED WITH: Cuttings
2SAMPLE NO.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
DRILLING DATE: August 31, 2006 SAMPLER BLOW COUNT
UNIT WET
WEIGHT, pcf
Approximately 400' west of main entrance to
plant. Proposed septage receiving station.
LOG OF BORING NO. B-3
SURFACE EL: 172.2 ft +/- (rel. MSL datum)
7 MATERIAL DESCRIPTION
SAMPLERS
9 D
6 C
5 4
B
8 172
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
LIQUID
LIMIT, %
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
UNIT DRY
WEIGHT, pcf
A
PLATE A-4a
DEPTH TO WATER: Wet soil noted DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
D53 of 179
DEPTH TO WATER: Wet soil noted
MATERIAL DESCRIPTION
PLASTICITY
DEPTH, ft
INDEX, %
11 PLATE A-4b
6 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
UNDRAINED SHEAR
STRENGTH, Su, ksf
98 Silty SAND (SM): medium dense, light brown, moist
Poorly-graded SAND (SP): medium dense, brown,
moist
93 22
SAMPLERS
10 (30)
LIQUID
LIMIT, %
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
UNIT DRY
WEIGHT, pcf
Carollo Engineers
Project No. 3045.053
SAMPLER
BLOW COUNT
% PASSING
#200 SIEVE
SURFACE EL: 172.2 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-3
Approximately 400' west of main entrance to
plant. Proposed septage receiving station.
SAMPLE NO.
130
128
126
124
122
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 UNIT WET
WEIGHT, pcf
BACKFILLED WITH: Cuttings
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
DRILLING DATE: August 31, 2006 ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 51.0 ft MATERIAL SYMBOL
D54 of 179
6 Poorly-graded SAND (SP) medium dense, brown,
moist
Silty SAND (SM): medium dense, brown, moist, fine
Poorly-graded SAND (SP): medium dense, brown,
moist
- brown, moist occasional orange staining, sandy
SILT (ML) layer approximately 3" thick in top of
sampler
- medium dense, light brown
- very loose
ALLUVIUM (Qal)
Poorly-graded SAND with silt (SP-SM): medium
dense, brown, moist
ARTIFICIAL FILL (af)
3" asphalt concrete over 3" aggregate base
2 5
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 5 6
9 6
8 5
1 A
2 104
(1)
13 (41)
26 (16)
28 (69)
117
103
108
113
- dense
100
98 111
4 (26)
3 MATERIAL
SYMBOL
ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 40.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
SURFACE EL: 156.8 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-4
Southwest corner of Plant. Proposed
percolation pond pump station.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf 5 6
7 8
9 SAMPLERS
MATERIAL DESCRIPTION
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. PLASTICITY INDEX, % B
DEPTH, ft
DEPTH TO WATER: Not Encountered
PLATE A-5
UNIT DRY
WEIGHT, pcf
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
LIQUID
LIMIT, %
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
UNIT WET
WEIGHT, pcf
D55 of 179
ALLUVIUM (Qal)
Poorly-graded SAND (SP): medium dense, brown,
moist, occasional gravel rounded (1/8" max)
(26)
- medium dense, light brown
Poorly graded SAND (SP): dense, brown, moist
Poorly-graded SAND with silt (SP-SM) medium dense,
brown, moist
- 10" thick well graded SAND (SW) layer
Poorly-graded SAND with silt (SP-SM) medium dense,
light brown, moist
SILT with sand (ML): soft, brown, moist, approximately
2" of lean clay in bottom of sampler, wet zone in
middle approximately 4" of sampler
8 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a ARTIFICIAL FILL (af)
gravel and filter fabric
12 5
7 6
6 1
A
2 - loose to medium dense
19 (52)
22 116
108
108
120
22 (36)
4 4
(15)
27 115
101
102
108
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 51.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
3 SURFACE EL: 157.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-5
Approximately 75' west of structure , 30 '
east of plant access rd. Proposed digester.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf 5 6
C
7 8
9 SAMPLERS
MATERIAL DESCRIPTION
BACKFILLED WITH: Cuttings
B
UNIT WET
WEIGHT, pcf
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
LIQUID
LIMIT, %
PLASTICITY
UNIT DRY
INDEX, %
WEIGHT, pcf
PLATE A-6a
DEPTH TO WATER: Not Encountered DEPTH, ft 2
4 6
8 10
12 14
16 18
20 22
24 26
28 30
32 34
36 38
40 D56 of 179
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
114
112
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
78 76
74 PLATE A-6b
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
10 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a DEPTH TO WATER: Not Encountered
- 2" thick interbed of Silty SAND (SM) in middle of
sampler
- dense, occasional gravel subrounded (1/4" max)
(34) 96
36 10
11 SAMPLERS
LIQUID
LIMIT, %
105
SAMPLER
BLOW COUNT
UNIT WET
WEIGHT, pcf
44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
SURFACE EL: 157.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-5
SAMPLE NO.
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Approximately 75' west of structure , 30 '
east of plant access rd. Proposed digester.
ELEVATION, ft
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
MATERIAL
SYMBOL
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 51.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
D57 of 179
112
1 5
3 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 5 6
p 1.5
SAMPLERS
MATERIAL DESCRIPTION
22 21
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
SILT with sand (ML): soft to medium stiff, brown,
moist
SILT (ML): medium stiff to stiff, brown, moist, orange
staining, gray mottling
- very soft to soft, wet
Poorly-graded SAND with silt (SP-SM): medium
dense, brown, moist
108
100 95
89 92
5 (11)
6 (12)
2 (16)
4 ELEVATION, ft
% PASSING
#200 SIEVE
COMPLETION DEPTH: 26.0 ft
LOCATION:
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
WATER
CONTENT, %
MATERIAL
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. 2 BACKFILLED WITH: Cuttings SAMPLE NO.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
DRILLING DATE: October 20, 2006 SAMPLER BLOW COUNT
Approximately 350' west of main entrance to
plant. Proposed septage receiving station.
LOG OF BORING NO. B-6
SURFACE EL: 172.5 ft +/- (rel. MSL datum)
172
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
UNIT DRY
WEIGHT, pcf
LIQUID
LIMIT, %
DEPTH TO WATER: Wet soil noted
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
UNIT WET
WEIGHT, pcf
PLATE A-7
D58 of 179
7 - dense
Poorly-graded SAND (SP): medium dense, light
brown, moist
- 5-inch thick layer of poorly-graded sand (SP) in
middle of sampler
- silt with sand (ML) in bottom of sampler, wet zone at
19.5'
SILT (ML): soft, brown, moist, orange staining, gray
mottling
SILT with sand (ML): medium stiff, brown, moist
- very loose
p 0.7
38 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 1 2
3 4
A
5 6
7 8
(51)
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
(12)
116
105
31 (17)
5 (5)
4 4
(7)
98 84
SAMPLERS
ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 41.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: October 20, 2006
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
9 MATERIAL
SYMBOL
SURFACE EL: 172 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-7
Approximately 400' west of main entrance to
plant. Proposed clarifier at Septage
Receiving Station.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
MATERIAL DESCRIPTION
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
DEPTH TO WATER: Wet soil noted
PLATE A-8
UNIT DRY
WEIGHT, pcf
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
LIQUID
LIMIT, %
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
UNIT WET
WEIGHT, pcf
BACKFILLED WITH: Cuttings
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
D59 of 179
100
92 81
2 Poorly-graded SAND (SP): medium dense, brown,
moist
Well-graded SAND (SW): medium dense, brown,
moist
SILT (ML): soft, brown, moist, wet in middle 8 inches
of sampler
- increase in grain size
- medium dense
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
3 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 106
107
87 6
(42)
(9)
(27)
18 (41)
14 (13)
7 (12)
ALLUVIUM (Qal)
Silty SAND (SM): loose, dark brown, moist
19 5
Sandy SILT (ML): medium stiff, brown, moist
13 12
11 10
9 8
SAMPLERS
6 4
3 2
1 7
7 DEPTH TO WATER: Wet soil noted
ARTIFICIAL FILL (af)
gravel and filter fabric
11 6
12 16
Silty CLAY (CL-ML): very soft to soft, brown, moist, 29 p 0.5 orange staining
DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
MATERIAL DESCRIPTION
7 PLATE A-9
WATER
ELEVATION, ft
CONTENT, %
MATERIAL
SYMBOL
COMPLETION DEPTH: 41.0 ft
BACKFILLED WITH: Cuttings
UNIT WET
WEIGHT, pcf
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
UNIT DRY
LIQUID
LIMIT, %
WEIGHT, pcf
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
LOG OF BORING NO. B-8
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
SAMPLER
BLOW COUNT
LOCATION: Approximately 600' west of Black Road.
Proposed Primary Trickling Filter.
SURFACE EL: 156.8 ft +/- (rel. MSL datum)
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
DRILLING DATE: October 20, 2006
% PASSING
#200 SIEVE
SAMPLE NO.
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
D60 of 179
100 10 1 0.1 0.01 0.001
50 100
90 80
60 40
30 20
10 0
70 4
4.1 2.7
1.5 1.5
Cc Cu
(depth,ft)
1.53 3/4 3/8 40 100
CLASSIFICATION
US STD SIEVE SIZE
19.0 4.0
4.0 NUMBERS
US STD SIEVE SIZE
INCHES
(location)
B-5
B-3
B-2
Poorly-graded SAND with silt (SP-SM)
Silty SAND (SM)
Poorly-graded SAND with silt (SP-SM)
200
SILT or CLAY
SAND
GRAIN SIZE CURVES
10 LEGEND
20 HYDROMETER ANALYSIS
GRAIN SIZE CURVES VENTURA (F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ) 10/11/06 01:03 p-sz Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
PLATE B-1
GRAVEL
GRAIN SIZE IN MILLIMETERS
Coarse Medium Fine
PERCENT FINER BY WEIGHT
Fine Coarse
Project No. 3045.053
D61 of 179
010 20 30 40 50 60 70 80 90 100
20 10
30 40
50 60
70 80
90 100
0 LIMIT(LL)
PLASTIC
LIMIT(PL)
Clayey SILT (ML)
Silty CLAY (CL-ML)
depth, ft
ATTERBERG LIMITS TEST RESULTS
PLASTICITY INDEX (PI)
INDEX (PI)
CL-ML
LIQUID LIMIT (LL)
PLASTICITY CHART
PLATE B-2
25 22
5 7
PLASTICITY CHART VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:04 a Project No. 3045.053
Carollo Engineers
CLASSIFICATION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
19.0 4.5
B-3
LIQUID
PLASTICITY
30 29
CH or OH
CL or OL
ML or OL
MH or OH
LEGEND
location
B-8
D62 of 179
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
2.0 0.0
0.5 1.5
2.5 3.0
3.5 4.0
1.0 LOCATION
6.0 SHEAR STRESS, ksf
NORMAL STRESS, ksf
0.0 35
UNIT DRY WEIGHT, pcf
Poorly-graded SAND with silt (SP-SM)
SAMPLE CONDITION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DEPTH, ft
MOISTURE CONTENT, %
COHESION, ksf
ANGLE OF INTERNAL FRICTION, deg
3 94
Remold
MATERIAL DESCRIPTION
B-1
6 DIRECT SHEAR TEST RESULTS
PLATE B-3a
DIRECT SHEAR PLOT VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:04 p Project No. 3045.053
Carollo Engineers
D63 of 179
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
2.0 0.0
0.5 1.5
2.5 3.0
3.5 4.0
1.0 LOCATION
6.0 SHEAR STRESS, ksf
NORMAL STRESS, ksf
0.0 33
UNIT DRY WEIGHT, pcf
Poorly-graded SAND with silt (SP-SM)
SAMPLE CONDITION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DEPTH, ft
MOISTURE CONTENT, %
COHESION, ksf
ANGLE OF INTERNAL FRICTION, deg
8 100
Ring Sample
MATERIAL DESCRIPTION
B-4
19 DIRECT SHEAR TEST RESULTS
PLATE B-3b
DIRECT SHEAR PLOT VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:04 p Project No. 3045.053
Carollo Engineers
D64 of 179
OPTIMUM WATER
CONTENT, %
MOISTURE CONTENT, %
UNIT DRY WEIGHT, pcf
LEGEND MAXIMUM UNIT
DRY WEIGHT, pcf
Test Method: ASTM D1557
25 COMPACTION TEST RESULTS
(location)
Poorly-graded SAND with silt (SP-SM)
135
100
105
110
115
120
5 10 15 20
125
130
0 CLASSIFICATION
116.0
PLATE B-4
depth, ft
B-1
COMPACTION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 09:42 a Project No. 3045.053
Carollo Engineers
6.0 ZERO AIR VOIDS CURVES
11.0 Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
(Gs = 2.65 to 2.75)
D65 of 179
SAMPLE CONDITION
DEPTH, ft
LOCATION
INITIAL MOISTURE CONTENT, %
MATERIAL DESCRIPTION
Project No. 3045.053
B-2
92 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
9 PLATE B-5a
CONSOLIDATION TEST RESULTS
Poorly-graded SAND with silt (SP-SM)
18 Carollo Engineers
8 10
12 14
16 18
20 CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p 2 0.1 1 10
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
6 4
0 100
D66 of 179
16 18
20 10
14 12
0 2
4 6
8 0.1
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
PLATE B-5b
1 10 100
MATERIAL DESCRIPTION
DEPTH, ft
Clayey SAND (SC)
INITIAL MOISTURE CONTENT, %
CONSOLIDATION TEST RESULTS
35 B-3
SAMPLE CONDITION
79 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
14 LOCATION
D67 of 179
16 18
20 MATERIAL DESCRIPTION
10 0.1 1 10 100
14 12
0 2
4 6
8 38
DEPTH, ft
LOCATION
Project No. 3045.053
B-7
SAMPLE CONDITION
84 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
19.5 PLATE B-5c
CONSOLIDATION TEST RESULTS
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
INITIAL MOISTURE CONTENT, %
SILT (ML)
D68 of 179
14 16
18 20
8 0.1 1 10 100
12 10
0 2
4 6
UNIT DRY WEIGHT, pcf
DEPTH, ft
LOCATION
INITIAL MOISTURE CONTENT, %
MATERIAL DESCRIPTION
16 B-8
SAMPLE CONDITION
92 STRAIN, %
7 PLATE B-5d
CONSOLIDATION TEST RESULTS
Sandy SILT (ML)
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
VERTICAL EFFECTIVE PRESSURE, ksf
WATER ADDED
D69 of 179
Carollo Engineers
Project No. 3045.053
SAND EQUIVALENT TEST RESULTS
Santa Maria Wastewater Treatment Plant Upgrades-Phase II Santa Maria, California
PLATE B-6
SAND EQUIVALENT TEST RESULTS
Sample
Number
Depth
(ft)
Clay Readings
(inches)
Sand Readings
(inches)
Sand
Equivalent
(SE)
Soil Type
B-1 9 5.5 3.4 62 Poorly-graded SAND
with silt (SP-SM)
B-5 4 9.0 2.7 30 Poorly-graded SAND
(SP)
B-6 4 5.3 2.9 55 Poorly-graded SAND
with silt (SP-SM)
Test Method: ASTM D2419
D70 of 179
D71 of 179
D72 of 179
D73 of 179
D74 of 179
D75 of 179
D76 of 179
D77 of 179
D78 of 179
D79 of 179
D80 of 179
D81 of 179
D82 of 179
D83 of 179
D84 of 179
D85 of 179
D86 of 179
D87 of 179
D88 of 179
D89 of 179
D90 of 179
D91 of 179
D92 of 179
D93 of 179
D94 of 179
D95 of 179
D96 of 179
D97 of 179
D98 of 179
D99 of 179
D100 of 179
!
"
# $ %
! " # $
% " %" & ' ( %
+ , -
. , -
-
+
/
0 .
1 2
2 3
1 .
3 3 , 1
, -
0 , -
0 , 1
. , 1
0 , -
. , -
+ , -
0 , -
+ , -
0 , -
. , -
1 , -
. , -
1 , -
/ , -
. , 1
/ , -
. , -
1 , -
0 , 1
/ , -
0 , -
/ , -
0 , -
+ , -
0 , 1
( 4
A #
3 3
4 5 :
3 3
4 )
3 9
>
?
3 3
4 )
3 9 ,
: @ >
?
+ , -
.
. , -
: @
5 )
3 9 ,
@ =
D101 of 179
SANDSTONE
Paving and/or Base Materials
Silty SAND (SM)
Silty CLAY (CL-ML)
MATERIAL DESCRIPTION
C
O
A
R
S
E
G
R
A
I
N
E
D
Poorly graded SAND (SP)
4 11
SYMBOL
PLATE A-1
Thin-walled Tube, pushed
R
O
C
K
F
I
N
E
G
R
A
I
N
E
D
3 CONGLOMERATE
Poorly graded GRAVEL (GP)
MUDSTONE
5 9
7 ANDESITE BRECCIA
Hand Auger Sample
SAMPLE NO.
MATERIAL
Fat CLAY (CH)
Well graded SAND (SW)
SILTSTONE
10 Project No. 3019.008
City of Santa Maria
Sonic Soil Core Sample
6 (25)
13 Symbol for:
No Sample Recovered
BASALT
Lexan Sample
Pitcher Sample
Vibracore Sample
CA Liner Sampler, driven
25 CA Liner Sampler, Bagged
KEY TO TERMS & SYMBOLS USED ON LOGS
1 SPT Sampler, driven
11 3 CA Liner Sampler, disturbed
(unless otherwise noted in report text) are as follows:
Sloped line in symbol column indicates
transitional boundary
General Notes
Soil Texture Symbol
Samplers and sampler dimensions
m = Miniature Vane
12 -12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 SURFACE EL: Using local, MSL, MLLW or other datum
Water Level Symbols
Length of sample symbol approximates
recovery length
Strength Legend
Classification of Soils per ASTM D2487
or D2488
Geologic Formation noted in bold font at
the top of interpreted interval
Blow counts for California Liner Sampler
shown in ( )
25 Blows/ft Description
REC"/DRIVE"
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
1-3/8" ID, 2" OD
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
25 blows drove sampler 12" after
initial 6" of seating
86/11"
50/6"
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50 blows drove sampler 6" after
initial 6" of seating
Ref/3" 50 blows drove sampler 3" during
initial 6" seating interval
ELEVATION, ft
6 18"/
30"
8 DEPTH, ft
20"/
24"
30"/
30"
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/27/08 02:56 p 10 12
CME Core Sample
4 t = Torvane
20"/
24"
Lean CLAY (CL)
Bulk Bag Sample (from cuttings)
Final ground water level
Seepages encountered
Initial or perched water level
u = Unconsolidated Undrained Triaxial
Q = Unconfined Compression
p = Pocket Penetrometer
Sampler Driving Resistance
CLAYSTONE
LOCATION:
(25)
(25)
Elastic SILT (MH)
(25)
Silty, Clayey SAND (SC-SM)
2-7/8" ID, 3" OD
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 BLOW COUNT /
Well graded GRAVEL (GW)
The drill hole location referencing local
landmarks or coordinates
Clayey SAND (SC)
SAMPLES
7 8
1 9
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
13 5
2 SILT (ML)
D102 of 179
10 LIMIT, %
CONTENT, %
DEPTH, ft
8 % PASSING
PLATE A-2
UNIT DRY
WEIGHT, pcf
ALLUVIUM (Qa2)
Lean CLAY (CL): stiff to very stiff, reddish brown to
greenish brown, moist
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, trace fine rounded gravel
UNIT WET
WEIGHT, pcf
LIQUID
INDEX, %
SAMPLE NO.
WATER
COMPLETION DEPTH: 7.0 ft ELEVATION, +/- MSL ELEVATION, ft
MATERIAL DESCRIPTION
2 4
6 8
10 12
14 DEPTH TO WATER: 5.5 ft
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Qa2
Project No. 3019.008
2 143
6 4
Disturbed Soils
141SYMBOL
145
147
149
151
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
PLASTICITY
0 Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, moist to wet, water perched at base of unit, strong organic odor
TD = 7.0 ft
MATERIAL
#200 SIEVE
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: East Side of Perc Pond No. 1
EXCAVATION METHOD: Backhoe
DEPTH, ft
SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
Black Sand
CONTRACTOR: City of Santa Maria
LOG OF TEST HOLE NO. T-1
CHECKED BY: J Blanchard
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
150
148
146
144
142
140
138
BLOWCOUNT
D103 of 179
EXCAVATION DATE: June 2, 2008
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST HOLE NO. T-2
150
148
146
144
142
140
138
Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, strong organic odor
LOGGED BY: GD Eckrich
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: City of Santa Maria
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
0 Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, occasional fine rounded gravel
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
2 PLATE A-3
UNIT WET
WEIGHT, pcf
ELEVATION, +/- MSL
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 2.5 ft
LIQUID
DEPTH TO WATER: Not Encountered
Black Sand
DEPTH, ft
LOCATION: East Side of Perc Pond No. 1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-2
TEST PIT GRAPHICAL REPRESENTATION
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time. 145 6
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Project No. 3019.008
City of Santa Maria
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 151
147
149
8 4
TD = 2.0 ft
Disturbed Soils
141
143
10 D104 of 179
0 EXCAVATION DATE: June 2, 2008
LOGGED BY: GD Eckrich
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: City of Santa Maria
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SAMPLES
SAMPLER
2 4
6 8
10 Black Sand
SYMBOL
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, occasional fine rounded gravel
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
150
148
146
144
142
140
138
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p ELEVATION, +/- MSL SAMPLE NO. 2 4
6 8
10 12
14 COMPLETION DEPTH: 3.0 ft
TD = 3.0 ft
151
149
147
145
143
141
INDEX, %
LIQUID
PLATE A-4
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST HOLE NO. T-3
UNIT WET
WEIGHT, pcf
DEPTH TO WATER: Not Encountered
LOCATION: East Side of Perc Pond No. 1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-3
TEST PIT GRAPHICAL REPRESENTATION
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
Disturbed Soils
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
DEPTH, ft
Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, strong organic odor
D105 of 179
MATERIAL DESCRIPTION
2 4
6 8
10 12
14 COMPLETION DEPTH: 9.0 ft ELEVATION, ft
UNIT DRY
INDEX, %
WEIGHT, pcf
WATER
PLASTICITY
ELEVATION, +/- MSL
LIMIT, %
% PASSING
ALLUVIUM (Qa2)
Lean CLAY (CL): stiff to very stiff, greenish brown, moist, fissured
SAMPLE NO.
PLATE A-5
UNIT WET
WEIGHT, pcf
LIQUID
2 10
1 ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): light gray to dark gray, wet
Disturbed Soils
Poorly-graded SAND with silt (SP-SM): loose to medium
dense, greenish brown, moist, trace fine rounded gravel 149
ALLUVIUM (Qa1)
Poorly-graded SAND with silt (SP-SM): medium dense,
reddish brown to greenish brown, moist to wet, water
perched at base of unit, oxidation mottling, lenses of Oil SAND
TD = 9.0 ft
Qa3
Qa2
Qa1
8 151
141
143
145
147
CONTENT, %
Disturbed Soils
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-4
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: 4.0 ft
#200 SIEVE
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
EXCAVATION DATE: June 2, 2008 SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe
DEPTH, ft
LOGGED BY: GD Eckrich
SAMPLES
150
148
146
144
142
140
138
LOG OF TEST HOLE NO. T-4
CHECKED BY: J Blanchard DEPTH, ft
BLOWCOUNT
MATERIAL
10 8
6 4
2 0
SYMBOL
D106 of 179
PLATE A-6
SAMPLES
UNIT WET
WEIGHT, pcf
CONTENT, %
% PASSING
LIQUID
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 8.0 ft
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
122
EXCAVATION METHOD: Backhoe
LOGGED BY: GD Eckrich
150
148
146
144
142
140
138
LOG OF TEST HOLE NO. T-5
#200 SIEVE
PLASTICITY
LIMIT, %
EXCAVATION DATE: June 2, 2008
ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): medium dense,
dark gray, wet
Lean CLAY (CL): soft, grayish brown, wet
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown to strong brown, wet
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, trace fine rounded gravel
1 ALLUVIUM (Qa1)
Poorly-graded SAND with gravel (SP): moist to wet, water perched at base of unit, occasional rounded to
subrounded gravel
CONTRACTOR: City of Santa Maria
ELEVATION, +/- MSL
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
14107 1
2 WATER
City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 149
CHECKED BY: J Blanchard
SAMPLER
TD = 8.0 ft
Qa3
Qa2
Qa2
Qa1
Disturbed Soils
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 151
141
143
145
147
6 DEPTH, ft
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time. 8 4
2 0
SYMBOL
DEPTH, ft
MATERIAL
10 TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-5
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: 3.5 ft
D107 of 179
LIQUID
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
LOG OF TEST HOLE NO. T-6
150
148
146
144
142
140
138
PLATE A-7
SYMBOL
CHECKED BY: J Blanchard
DEPTH, ft
SAMPLES
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
#200 SIEVE
EXCAVATION METHOD: Backhoe INDEX, %
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
CONTRACTOR: City of Santa Maria
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown, moist, fissured, abundant black mottling
UNIT WET
WEIGHT, pcf
Fat CLAY (CH): soft, greenish brown, moist
ALLUVIUM (Qa1)
Poorly-graded SAND with silt (SP-SM): light to dark reddish brown, moist
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist
ALLUVIUM (Qa3)
Silty Fine SAND (SM): dark gray, moist
ELEVATION, +/- MSL
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 8.0 ft MATERIAL ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
WATER
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 149
147
SAMPLER
Disturbed Soils
TD = 8.0 ft
Qa3
Qa2
Qa2
151
141
143
145
Qa1
DEPTH, ft
10 8
6 4
2 0
LOCATION: West Side of Perc Pond No. 1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
SURFACE EL: 151.0 ft +/- (rel. datum)
DEPTH TO WATER: Not Encountered
LOG OF TEST PIT NO. T-6
D108 of 179
CONTENT, %
% PASSING
DEPTH, ft
UNIT WET
WEIGHT, pcf
#200 SIEVE
LIQUID
INDEX, %
SAMPLE NO.
EXCAVATION DATE: June 2, 2008 SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe LIMIT, %
LOGGED BY: GD Eckrich PLASTICITY
148
146
144
142
140
138
136
LOG OF TEST HOLE NO. T-7
CHECKED BY: J Blanchard
ALLUVIUM (Qa1)
Silty SAND (SM): black, moist
2 4
6 8
10 12
14 ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): dark gray to black, moist, organic odor
1 ALLUVIUM (Qa2)
Fat CLAY (CH): stiff, reddish brown, moist, fissured, black mottling, occasional white chert clasts
2 Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist
Lean CLAY (CL): soft, greenish brown, moist
UNIT DRY
WEIGHT, pcf
SAMPLES
ELEVATION, +/- MSL
ELEVATION, ft
COMPLETION DEPTH: 15.0 ft
WATER
7 8
MATERIAL DESCRIPTION
PLATE A-8
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 4 BLOWCOUNT
MATERIAL
Disturbed Soils
TD = 15.0 ft
Qa3
Qa2
City of Santa Maria
Qa1
150
130
134
138
142
Qa2
DEPTH, ft
0 SYMBOL
LOCATION: West Side of Perc Pond No. 1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-7
SURFACE EL: 150.0 ft +/- (rel. datum)
DEPTH TO WATER: Not Encountered
146
8 12
16 20
D109 of 179
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 140
142
144
146
Disturbed Soils
Clayey SAND (SC): reddish brown, wet, occasional
rounded gravels, pockets of gray SAND with Silt (SP-SM) at base of unit
150
ALLUVIUM (Qa2)
Fat CLAY (CH): reddish brown, moist, fissured, oxidation mottling, occasional white chert clasts
City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 148
UNIT DRY
WEIGHT, pcf
Qa2
Qa2
ALLUVIUM (Qa3)
Silty Fine SAND (SM): gray to black, moist to wet
Fat CLAY (CH): stiff to very stiff, reddish brown, moist Lean CLAY (CL): soft, greenish brown, moist
1 Qa3
TD = 8.0 ft
Qa2
Disturbed Soils
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
WATER
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-8
SURFACE EL: 150.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: Not Encountered SAMPLER
6 4
2 0
SYMBOL
LOGGED BY: GD Eckrich
DEPTH, ft
SAMPLES
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
EXCAVATION METHOD: Backhoe
MATERIAL DESCRIPTION
MATERIAL
8 10
DEPTH, ft
CHECKED BY: J Blanchard LIQUID
EXCAVATION DATE: June 2, 2008 ELEVATION, +/- MSL
CONTRACTOR: City of Santa Maria
PLATE A-9
COMPLETION DEPTH: 8.0 ft ELEVATION, ft
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 UNIT WET
WEIGHT, pcf
LIMIT, %
148
146
144
142
140
138
136
LOG OF TEST HOLE NO. T-8
CONTENT, %
% PASSING
#200 SIEVE