CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 1: Executive Summary
FINAL / October 2026
Attachment F

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 1: Executive Summary
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.28 09:43:43-07'00'
VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 1/ES.docx Master Plan Table of Contents
Volume 1 Executive Summary
Volume 2 Basis of Planning
Volume 3 Wastewater Characterization and Process Modeling Volume 4 Existing Facilities Condition Assessment
Volume 5 Wastewater Collection System
Volume 6 Liquid Treatment Approach for Addressing General Order Volume 7 Water Reuse and Liquid Disposal
Volume 8 Biosolids Handling and Disposal
Volume 9 Energy Management
Volume 10 Air Quality and Emissions Odor Control
Volume 11 Capital Improvement Program and Implementation Volume 12 Funding Opportunities
Volume 13 Support Facilities
VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Contents

EXECUTIVE SUMMARY
ES.1 What Was Learned ES-1
ES.2 Outcomes & Impacts ES-2
ES.3 Recommendations & Next Steps ES-2
ES.4 Preliminary Timeline and Budget ES-3
ES.5 Summary of the Master Plan ES-4
ES.6 Guide to the Wastewater Master Plan Volumes ES-5
ES.6.1 Volume 1 – Executive Summary ES-5
ES.6.2 Volume 2 – Basis of Planning ES-5
ES.6.3 Volume 3 – Wastewater Characterization and Process Modeling ES-5 ES.6.4 Volume 4 – Existing Facilities Condition Assessment ES-5 ES.6.5 Volume 5 – Wastewater Collection System ES-6
ES.6.6 Volume 6 – Liquid Treatment Approach for Addressing General Order ES-6 ES.6.7 Volume 7 – Water Reuse and Liquid Disposal ES-6
ES.6.8 Volume 8 – Biosolids Handling and Disposal ES-6
ES.6.9 Volume 9 – Energy Management ES-7
ES.6.10 Volume 10 – Air Quality, Emissions, and Odor Control ES-7 ES.6.11 Volume 11 – Capital Improvement Program and Implementation ES-7 ES.6.12 Volume 12 – Funding Opportunities ES-8
ES.6.13 Volume 13 – Support Facilities ES-8
Tables
Table ES.1 Budget Summary for Short-Term CIP Implementation Through 2036 ES-4 Figures
Figure ES.1 Planning Level Schedule for Short-Term Projects ES-3 VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
City City of Santa Maria
CIP Capital Improvement Program
CWSRF California Clean Water State Revolving Fund
O&M operations and maintenance
WIFIA Water Infrastructure Finance and Innovation Act
WWTP wastewater treatment plant
VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-1

EXECUTIVE SUMMARY
The City of Santa Maria (City) must ensure its wastewater treatment system continues to protect public health, the environment, and groundwater while supporting a growing community. The last major plan was completed decades ago, and since then:
 New State regulatory requirements have been issued, including far stricter water quality limits. The City has secured a time extension until 2034 to implement improvements to the wastewater treatment plant (WWTP) which are required to meet the stricter water quality limits.  Wastewater strength has increased, leading to higher organic and nutrient (nitrogen) loading, because water conservation has resulted in lower water use per person.  Critical infrastructure is aging, with structures built as far back as the 1960s now approaching the end of their useful life.
 Population and economic growth will increase the quantity and strength of wastewater the City must treat through 2060.
 Receiving septage is critical to the region since the City is one of the last remaining WWTPs to receive and treat septage from residential, commercial, and industrial users.

This Master Plan provides a clear, long-term roadmap—spanning almost 35 years—to ensure the WWTP remains reliable, compliant, and capable of serving the community into the future.

ES.1 What Was Learned

1. The regulatory bar is rising significantly:

The City is now operating under a new statewide permit that sets much stricter limits on what can be released to groundwater, including a new limit on the total nitrogen content. Meeting these standards requires new treatment technology that the existing plant cannot provide.

2. Current facilities cannot meet future needs:

Several major treatment components are at or near their capacity due to increased organic loading caused by higher-strength wastewater. Even without population growth, the existing plant cannot meet regulatory requirements. Many critical structures are 40 to 60 years old and require rehabilitation or replacement to continue functioning safely.

3. Capacity increases are needed to keep pace with growth:

Projections show that Santa Maria’s flows and loads will exceed the plant’s design capacity by the early 2030s. Two future upgrades (Phase 1 and Phase 2) will be required to provide reliable treatment through 2060.

4. The best long-term solution is to stay at the existing site:

After evaluating multiple options—including a full relocation to a new site—the City determined that building the required new treatment facilities at the current WWTP is the most cost-effective, least disruptive, and operationally efficient path.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-2

5. A modern treatment process is needed:

Many alternatives were considered, and several options were tested in both the field and laboratory to verify treatment performance with the City’s wastewater. An organics-and-nitrogen-removal treatment system (the "Bardenpho" process) was identified as the alternative that reliably meets upcoming regulations while providing long-term operational flexibility and the lowest lifecycle cost.

ES.2 Outcomes & Impacts
Protecting Public Health and the Environment
 Ensures compliance with strict groundwater protection requirements.  Reduces nutrients (like nitrogen) and other constituents that can impact aquifers.

Maintaining a Reliable Essential Service
 Replaces aging infrastructure before failure occurs.
 Delivers a modern, efficient system that can reliably serve the community for decades.

Supporting Economic Growth
 Provides treatment capacity so homes, businesses, and industries can continue to grow without service constraints.

Improving Energy Efficiency and Resilience
 Includes on-site renewable energy generation and biogas recovery to reduce long-term operating costs.

Responsible Use of Ratepayer Funds
 Selects the most cost-effective solution after evaluating multiple options.  Aligns project phasing with financial capacity and available state/federal low-interest loans.

Limitations & Considerations
 Project cost is substantial and will require phased investments through 2060.  Construction must occur while the current plant stays in service, which adds complexity.  Future regulations may evolve, requiring flexibility in design and space for future treatment upgrades.
 Decisions on continued acceptance of septage have operational and financial implications for local haulers and the City.

ES.3 Recommendations & Next Steps
The Master Plan has identified Short-, Medium-, and Long-Term projects to satisfy the infrastructure needs through 2060. The following Short-Term projects are recommended for completion over the next 10 years:

1. Construct new percolation ponds:

These are needed to enhance disposal capacity and support future treatment changes.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-3

2. Move forward with Phase 1 WWTP upgrades:

Phase 1 provides new treatment facilities sized to meet regulatory deadlines and support the community through approximately 2052. This is the most urgent component of the plan and is a critical requirement to meet the new permit and timeline.

3. Rehabilitate existing aging infrastructure:

Address priority repairs that must occur before Phase 1 comes online.

In parallel with completing of the Short-term projects, the City should also do the following:
 Pursue state and federal low-interest financing.

The City should continue advancing Water Infrastructure Finance and Innovation Act (WIFIA) and State Revolving Fund loan applications to reduce the financial burden on ratepayers.  Engage the community.

Because wastewater projects are large, long-term investments, transparent communication with residents and elected officials is essential—particularly around timing, costs, and benefits.

ES.4 Preliminary Timeline and Budget
A planning-level schedule outlining the implementation of Short-Term projects to address immediate WWTP performance needs, the design and construction of new percolation ponds, and the Phase 1 upgrade is shown in Figure ES.1. The schedule is preliminary, and the City will strive to accelerate portions of the work to meet regulatory deadlines or seek regulatory time extensions as appropriate.

Figure ES.1 Planning Level Schedule for Short-Term Projects VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-4
The budget for the Short-Term capital improvements work developed through the master planning process is shown in Table ES.1.

Table ES.1 Budget Summary for Short-Term CIP Implementation Through 2036 Short-Term Project Description Budget Cost
Percolation Pond Expansion Build 46 acres of new percolation ponds on City-owned property east of Black Road
$76 million
Plant Rehabilitation Replace aging infrastructure at the existing plant $3 million Phase 1 WWTP Upgrade Build a new WWTP System at the existing WWTP Site to comply with the new State regulatory requirements
$536 million
ES.5 Summary of the Master Plan
This Master Plan lays out a clear path to modernize Santa Maria’s WWTP so that it remains safe, reliable, environmentally responsible, and financially sustainable through 2060. The recommendations in this plan strengthen the City’s ability to protect public health and local groundwater, meet new state regulatory requirements, and replace aging infrastructure before problems occur.

By investing in these improvements now, the City positions the community for long-term success— ensuring that future homes, businesses, and industries can continue to grow without service limitations.

The plan also reflects the City’s commitment to using ratepayer dollars responsibly by selecting cost-effective solutions and aligning major projects with available state and federal funding opportunities.

Overall, this Master Plan provides a forward-looking strategy to maintain a critical public service, safeguard environmental resources, and support the community’s needs for decades to come.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-5
ES.6 Guide to the Wastewater Master Plan Volumes
Each Volume of the Master Plan is summarized at a high level in this section. The purpose is to provide the reader with a reference guide to help find specific details.

ES.6.1 Volume 1 – Executive Summary
Purpose: Provides a high-level summary of the work performed, outcomes, and next steps.

What it covers: Focused Executive Summary of the 13 Volume WWTP Master Plan.

Use this volume if you want: A quick understanding of the work performed and the anticipated next steps.

ES.6.2 Volume 2 – Basis of Planning
Purpose: Establishes the planning framework, foundational assumptions, and approach used for the entire Master Plan.

What it covers: Planning horizon to 2060, service area, environmental setting and land uses, regulatory requirements, population, and assumptions for development of wastewater flows and loads, climate change adaptation, and the basis used to develop cost estimates used across subsequent volumes.

Use this volume if you want: An understanding of the foundational assumptions and framework that guide the analysis throughout the Master Plan.

ES.6.3 Volume 3 – Wastewater Characterization and Process Modeling Purpose: Defines the quality and strength of wastewater entering the system and evaluates how treatment processes perform under current and future conditions.

What it covers: Flow and loading characteristics, wastewater sampling data, modeling of treatment processes, projected changes in influent flow and load, and performance expectations for alternative treatment systems.

Use this volume if you want: Detailed information about the constituents of the wastewater, historical performance data, and the basis for developing the initial process models.

ES.6.4 Volume 4 – Existing Facilities Condition Assessment Purpose: Documents the physical and operational condition of existing infrastructure and remaining useful life.

What it covers: Structural evaluations, equipment age and reliability, capacity constraints, maintenance issues, and identification of critical assets needing repair or replacement, as well as which of the existing facilities/structures have potential for use in the next 20 to 40 years.

Use this volume if you want: A comprehensive look at current wastewater treatment facilities, their condition and remaining useful life, and a list of interim projects required to maintain plant performance until the new plant is operational.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-6
ES.6.5 Volume 5 – Wastewater Collection System
Purpose: Provides a high-level overview of the City’s sewer collection system that transports wastewater to the treatment plant.

What it covers: System layout, description of the existing septage receiving station, and major trunk lines entering the treatment plant.

Use this volume if you want: Information on sewer collection system layout, location of major trunk sewers, the existing septage receiving station, and the City’s Sewer System Management plan (in the Appendix). This volume does not include a detailed analysis of the collection system condition, its hydraulic capacity, or any limitations that will need to be addressed. The City is undertaking a separate, more detailed assessment of the sewer collection system to make such determinations.

ES.6.6 Volume 6 – Liquid Treatment Approach for Addressing General Order Purpose: Presents the detailed evaluation of treatment technologies and approaches to meet the requirements of the State's General Order for groundwater protection, for the flows and loads established in Volume 2.

What it covers: Regulatory requirements, development of process alternatives, technology screening and evaluation, technical evaluation of short-listed alternatives, preliminary siting and layout configurations, development and comparison of capital, operations, and maintenance (O&M) costs, and selection and preliminary layout of the preferred treatment strategy.

Use this volume if you want: A clear explanation of the methodology used to develop and evaluate alternative treatment configurations and sites for the new treatment plant to meet future regulatory standards, and why the chosen technology was selected.

ES.6.7 Volume 7 – Water Reuse and Liquid Disposal
Purpose: Identifies strategies for managing treated wastewater, including water reuse and the current approach of disposal via percolation ponds.

What it covers: Detailed evaluation of water reuse and development of alternatives for local agriculture and urban irrigation use, existing percolation pond percolation rates and history of performance, soils investigations, percolation pond water balance, percolation pond capacity, and long-term maintenance needs and costs to sustain percolation rates.

Use this volume if you want: Insight into where the treated water goes and why the disposal method will remain percolation ponds for the foreseeable future.

ES.6.8 Volume 8 – Biosolids Handling and Disposal
Purpose: Examine in detail alternatives for treating and disposing of solids produced during the wastewater treatment process.

What it covers: Existing and future biosolids disposal regulations, anticipated biosolids production from the alternative liquid stream treatment approaches, hauling and disposal alternatives and costs, and the recommended level of biosolids treatment.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-7
Use this volume if you want: Information about the current and future biosolids production, biosolids treatment and disposal strategies for the short-listed liquid treatment configurations, annual cost estimates, and the decision to maintain production of Class B biosolids for disposal for long-term sustainability.

ES.6.9 Volume 9 – Energy Management
Purpose: Analyze current and future energy needs, evaluate the potential for renewable energy use at the treatment plant, including beneficial use of biogas (digester gas), and recommend a suitable approach for the new treatment plant configuration.

What it covers: Current energy consumption, anticipated biogas production, life-cycle cost analyses, evaluation of multiple energy management approaches, including on-site power generation options, biogas utilization, and strategies for reducing long-term energy costs, including evaluation of a micro-grid.

Use this volume if you want: Details on how the plant can become more energy-efficient and reduce its reliance on PG&E power.

ES.6.10 Volume 10 – Air Quality, Emissions, and Odor Control Purpose: Assesses the plant’s air emissions profile and identifies strategies to manage odors and meet air permitting requirements, and presents a preliminary permitting plan for the new plant.

What it covers: Sources of odors and emissions, federal, state, and local air quality regulations, mitigation technologies, and recommended odor and emission control upgrades for the short and long-term to minimize community and regulatory impacts; in addition to a permitting plan which identifies anticipated permitting needs and timing for the new treatment plant.

Use this volume if you want: Information about air permitting, odor concerns, strategies to protect community air quality, which permit requirements have been identified, and the anticipated timeframe for obtaining such permits.

ES.6.11 Volume 11 – Capital Improvement Program and Implementation Purpose: Outlines the recommended projects, sequencing, and schedules to implement the Master Plan through 2060, and discusses alternatives for project delivery.

What it covers: Short-, medium-, and long-term project implementation periods, capital project descriptions, a preliminary implementation schedule through 2038, a tabular summary of the overall Capital Improvements Program through 2060, and the projected annual capital outlay by fiscal year through completion of the Phase 1 Project. Project delivery methods are analyzed in detail, and recommendations are given for the preferred approach to delivering the Phase 1 Project.

Use this volume if you want: A roadmap for what will be built and when, including cost and annual outlay expectations, and the proposed project delivery method for the Phase 1 Project.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-8
ES.6.12 Volume 12 – Funding Opportunities
Purpose: Provides details of current funding mechanisms that the City could pursue to assist with funding for the CIP.

What it covers: Federal and state funding opportunities, descriptions of each, typical loan or grant amounts, deadlines and constraints, recommended preferred funding approaches and timelines, general loan application timelines, and typical reporting requirements.

Use this volume if you want: Information about the funding programs (such as California Clean Water State Revolving Fund [CWSRF] and WIFIA) that the City is considering and how their timing works relative to the Phase 1 Project.

ES.6.13 Volume 13 – Support Facilities
Purpose: Addresses improvements needed for buildings, site infrastructure, and non-process systems that support the WWTP operations both now and in the future.

What it covers: Plant water systems and a proposed new Utility Water system, plant drainage and stormwater management, instrument air and propane facilities, the Utility building, Maintenance facilities, Administrative building and laboratory needs, and an evaluation of alternatives for upgrading the septage receiving area and treatment facilities.

Use this volume if you want: Information about the supporting systems and facilities that keep the plant operational beyond the treatment processes, and the proposed modifications to improve the septage handling and its impact on the treatment plant.

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 2: Basis of Planning
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 2: Basis of Planning
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.24 11:11:05-07'00'
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 3/Ch01 Contents
CHAPTER 1 INTRODUCTION/PLANT HISTORY

1.1 Purpose 1-1

1.2 Plant History 1-1

1.3 Master Plan Drivers 1-4

1.4 Goals and Objectives 1-5

1.5 Master Plan Organizational Structure 1-5
CHAPTER 2 PARTNERS, STAKEHOLDERS, AND SERVICE AREA

2.1 Location and Service Area 2-1

2.1.1 Climate/Geography 2-1

2.1.2 Service Area 2-2

2.2 Relevant Stakeholders 2-4

2.3 Consolidation 2-4

2.4 Laguna County Sanitation District Agreement 2-6

2.5 Land Acquisition, Leases, and Property 2-7

2.6 Conclusion 2-11
CHAPTER 3 ENVIRONMENTAL SETTING AND LAND USES

3.1 Introduction 3-1

3.1.1 Environmental Impact Reports 3-1

3.2 Land Use 3-3

3.2.1 City Land Use 3-3

3.2.2 WWTP Property Land Use 3-6

3.3 Preliminary Resource Analyses 3-7

3.3.1 Biological Resources 3-7

3.3.2 Cultural Resources 3-8
CHAPTER 4 REGULATORY REQUIREMENTS

4.1 Introduction 4-1

4.2 Water Quality 4-1

4.2.1 Regulatory Setting and Overview 4-1

4.2.2 Current Regulations and Practices 4-3

4.2.3 Future Regulations 4-7

4.2.4 Treatment Implications 4-11

4.3 Biosolids and Solids Handling 4-11

4.3.1 Regulatory Setting and Overview - Solids Handling 4-11

4.3.2 Current Regulations and Practices 4-16

4.3.3 Future Biosolids Regulations 4-22

4.3.4 Treatment Implications 4-24
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii

4.4 Air Quality 4-24

4.4.1 Regulatory Setting and Overview - Air Quality 4-24

4.4.2 Current Criteria Pollutant Regulations 4-27

4.4.3 Current Hazardous Pollutant Regulations 4-28

4.4.4 Current Climate Change Regulations 4-30

4.4.5 Current Practices 4-31

4.4.6 Future Air Quality Regulations 4-33

4.4.7 Treatment Implications 4-33

4.5 Water Reuse 4-34

4.5.1 Regulatory Setting and Overview - Water Reuse 4-34

4.5.2 Current Water Reuse Regulations 4-34

4.5.3 Current Practices 4-37

4.5.4 Treatment Implications 4-37

4.6 Key Takeaways 4-38
CHAPTER 5 POPULATION, LOADING, AND FLOW REQUIREMENTS

5.1 Purpose 5-1

5.2 Background 5-1

5.2.1 Master Plan Basis 5-2

5.2.2 Assumptions 5-2

5.3 Population 5-2

5.3.1 Historic Population 5-3

5.3.2 Projected Population 5-3

5.4 Service Area Land Use 5-4

5.5 Wastewater Flows 5-4

5.5.1 Wastewater Flow Components 5-4

5.5.2 Historic Flows 5-5

5.5.3 Peak Flows 5-6

5.5.4 Modeled Flow Scenarios 5-9

5.5.5 Wastewater Flow Factors 5-10

5.5.6 Buildout Determination 5-10

5.5.7 Wastewater Flow Projections 5-11

5.5.8 Contributing Agency Flows 5-11

5.5.9 Total Flows 5-12

5.6 Wastewater Loads 5-13

5.6.1 Carbonaceous Biochemical Oxygen Demand/Biochemical Oxygen Demand Ratio 5-13

5.6.2 Historic Loading Characteristics 5-13

5.6.3 Contributing Agency Loads and Septage 5-15

5.7 Water Reuse/Disposal 5-16

5.8 Loading Projections 5-17

5.8.2 Projected Concentrations 5-19

5.9 Basis of Design/Summary 5-21

5.9.1 Timing for Plant Expansions to 2060 5-22
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
CHAPTER 6 BASIS OF COST ESTIMATES AND FINANCIAL PLANNING

CONSIDERATIONS

6.1 Purpose 6-1

6.2 Background 6-1

6.3 Level of Accuracy 6-1

6.4 Operations and Maintenance Costs 6-1

6.5 Capital Costs 6-2

6.6 Life-Cycle Costs 6-3
Appendices
APPENDIX A 1948 HISTORICAL AERIALS
APPENDIX B 1967 HISTORICAL AERIALS
APPENDIX C 1981 HISTORICAL AERIALS
APPENDIX D 2006 HISTORICAL AERIALS
APPENDIX E 2016 HISTORICAL AERIALS

APPENDIX F BIOLOGICAL RESOURCES MEMO

APPENDIX G BASIN PLAN OBJECTIVES

APPENDIX H SANTA MARIA UPDATED NOTICE OF APPLICABILITY AND MONITORING AND

REPORTING PROGRAM

APPENDIX I TIME SCHEDULE COMPLIANCE PLAN

APPENDIX J GROUNDWATER MONITORING

APPENDIX K TDS SOURCE WATER IMPROVEMENT STUDY

APPENDIX L TIME SCHEDULE ORDER

APPENDIX M CLIMATE CHANGE ADAPTATION PLAN

APPENDIX N POTENTIAL FUTURE REGULATIONS FOR PERCOLATION POND OPERATION

APPENDIX O CITY OF SANTA MARIA RESIDENTIAL ORGANIC RECYCLING PROGRAM BROCHURE APPENDIX P CITY OF SANTA MARIA 2018 ANNUAL EPA SLUDGE REPORT APPENDIX Q STATEWIDE GENERAL COMPOSTING PERMIT (ORDER WQ201-0121-DWQ)

APPENDIX R SIGNIFICANT INDUSTRIAL USERS

APPENDIX S PERCOLATION PONDS
APPENDIX T AACE INTERNATIONAL RECOMMENDED PRACTICE NO. 18R-97 Tables
Table 1.1 Update to the Master Plan Volumes 1-5
Table 2.1 Relevant Stakeholders 2-4
Table 3.1 Land Use Percentages - 2020 3-3
Table 3.2 Current Land Uses in WWTP Area 3-7
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Table 4.1 City WWTP Interim Effluent Limitations (until June 16, 2025) and Historical Water Quality 4-4
Table 4.2 City WWTP Final Effluent Limitations (After June 16, 2025) 4-4 Table 4.3 Upper Guadalupe Groundwater Basin Options for Final Compliance (After June 16, 2025) 4-6
Table 4.4 Interim and Final Compliance Limits for BOD, TSS, and Total Nitrogen - Time Schedule Order (February 2026) 4-6
Table 4.5 Constituents of Interest for Future Regulations 4-7 Table 4.6 Summary of Solids and Biosolids Regulatory Agencies and Regulations 4-13 Table 4.7 State Permit (2004-0012-DWQ) - Biosolids Limits (Metals) 4-19 Table 4.8 State Permit (2004-0012-DWQ) - Biosolids Limits (Pathogens) 4-19 Table 4.9 Summary of Air Quality Regulatory Agencies and Requirements 4-26 Table 4.10 GHG Emissions Threshold for Reporting Years 2011 and Beyond 4-31 Table 4.11 Santa Maria Permit Potential to Emit Limits - Tons Per Year 4-32 Table 4.12 Flares and Boiler No. 1 Permitted Flows 4-32 Table 4.13 Summary of Water Reuse Regulatory Agencies, Legislation, and Requirements 4-34
Table 4.14 Title 22 Groundwater Recharge via Subsurface Injection Requirements for Potable Reuse 4-36
Table 4.15 Summary of Regulatory Requirements 4-38
Table 5.1 Historical and Projected Population Growth 5-3 Table 5.2 2020 Santa Maria Land Use 5-4
Table 5.3 Wastewater Collection System Commonly Used Terminology 5-5 Table 5.4 2020 Historical Flows Per Capita 5-5
Table 5.5 Daily Average Monthly Maximum Flows From 2018-2023 5-6 Table 5.6 Peak Hourly Monthly Maximum Flows From 2018-2023 5-8 Table 5.7 Sewer to Water Usage Factors With 2020 Water Consumption Data 5-9 Table 5.8 Flow Reduction Scenarios for Projection Modeling 5-10 Table 5.9 30-Day Maximum Peaking Factors for Wastewater Characteristics 5-14 Table 5.10 Septage Loading Characteristics 5-15
Table 5.11 Per Capita Loading Characteristics From 2018-2020 5-17 Table 5.12 2060 Peak Loading Estimates 5-19
Table 5.13 2060 Concentrations Across Flow Scenarios 5-19 Table 5.14 Basis of Design for Average Loading and Flows to 2060 5-21 Table 5.15 Basis of Design for Peak Loading and Flows to 2060 5-22 Figures
Figure 1.1 Aerial View of the WWTP in 1949 1-1
Figure 1.2 Aerial View of WWTP in 1967 1-2
Figure 1.3 Aerial View of WWTP Taken in 1981 1-3
Figure 1.4 Aerial View of the WWTP Taken in 2006 1-3
Figure 1.5 Aerial View of the WWTP Taken in 2016 1-4
Figure 2.1 Location of Santa Maria Within the State of California 2-2 Figure 2.2 City Limits and Service Area 2-3
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN v
Figure 2.3 City of Guadalupe City Limits and WWTP Locations 2-5 Figure 2.4 Land Areas Adjudicated Between LCSD and Santa Maria WWTP 2-7 Figure 2.5 Existing Property Owned by the Santa Maria WWTP for Potential Use in Facility Expansion 2-8
Figure 2.6 Existing Easements and ROW Present Alongside Santa Maria Property Line 2-9 Figure 2.7 Existing Property Leased to Agro-Jal Enterprises 2-10 Figure 3.1 Land Areas Evaluated for Use as Part of the 2006 EIR 3-2 Figure 3.2 Land Use Planning Alternatives (2020 General Plan Update) 3-4 Figure 3.3 Zoning Map in Santa Maria 3-5
Figure 3.4 Santa Maria Property Line for WWTP Expansions 3-6 Figure 4.1 Map of County Ordinances 4-21
Figure 5.1 Existing Sewer Lines in the City of Santa Maria 5-1 Figure 5.2 Expected Population Growth to 2060 5-3
Figure 5.3 Average Monthly Flows to Santa Maria WWTP (2018-2022) 5-6 Figure 5.4 Maximum Observed Daily Average Flow per Month Into Santa Maria WWTP (2018-2023) 5-7
Figure 5.5 Maximum Observed Hourly Flow per Month Into Santa Maria WWTP (2019- 2023) 5-8
Figure 5.6 Flow Projections With Selected Scenarios 5-11 Figure 5.7 Flow Projections of Contributing Agency Flows 5-12 Figure 5.8 Total Flow Projections at Selected Scenarios (Including Contributing Agency Flows) 5-13
Figure 5.9 Historical Monthly Loading Characteristics 5-14 Figure 5.10 Net Percolation Into the Percolation Ponds 5-16 Figure 5.11 Projected Annual Loading Characteristics 5-18 Figure 5.12 Projected Annual TSS Concentrations Over Different Flow Scenarios 5-20 Figure 5.13 Projected Annual BOD5 Concentrations Over Different Flow Scenarios 5-20 Figure 5.14 Projected Annual BOD5 Concentrations Over Different Flow Scenarios 5-21 Figure 5.15 Trigger Curve for Phased Plant Expansions to 2060 Based on Flow 5-22 Figure 5.16 Trigger Curve for Phased Plant Expansions to 2060 Based on Load 5-23 VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
Abbreviations
AAF annual average flow
AAL annual average load
AB Assembly Bill
ADC alternative daily cover
ADMMF average daily maximum month flow
ADMML average daily maximum month load
ADU accessory dwelling unit
ATC Authority to Construct
BOD biochemical oxygen demand
BOD5 5-day biochemical oxygen demand
BWF base wastewater flow
CAA Clean Air Act
CAAQS California Ambient Air Quality Standards
CalRecycle California Department of Resources Recycling and Recovery CAP Climate Action Plan
CARB California Air Resources Board
Carollo Carollo Engineers
CBOD carbonaceous biochemical oxygen demand
CCL Contaminant Candidate List
CCR California Code of Regulations
CDWF California Department of Wildlife
CEC constituents of emerging concern
Central Coast Basin Plan Water Quality Control Plan for the Central Coast Basin CEQA California Environmental Quality Act
CFR Code of Federal Regulations
CFU colony forming unit
CH4 methane
City City of Santa Maria
CO carbon monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
CPI Consumer Price Index
CTR Regulation for the Reporting of Criteria Air Pollutants and Toxic Air Contaminants CWA Clean Water Act
CWEA California Water Environment Association
CWSRF Clean Water State Revolving Fund
DAC disadvantaged community
DBCM chlorodibromomethane
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
DCBM bromodichloromethane
DDW Division of Drinking Water
degrees C degrees Celsius
degrees F degrees Fahrenheit
DLR Detection Limit for Purposes of Reporting
DPR direct potable reuse
DPS Distinct Population Segment
EIR Environmental Impact Reports
Engel & Gray Engel & Gray, Inc.

EPA United States Environmental Protection Agency
FEMA Federal Emergency Management Agency
GHG greenhouse gas
gpcd gallons per capita per day
gpd gallons per day
H2S hydrogen sulfide
HAA5 haloacetic acids
HFPO-DA hexafluoropropylene oxide dimer acid
HI Hazard Index
IPR indirect potable reuse
lb/day pounds per day
LCSD Laguna County Sanitation District
MCL maximum contaminant level
mg/kg milligrams per kilogram
mg/L milligrams per liter
mgd million gallons per day
mL milliliter
µg/L micrograms per liter
mL/L milliliters per liter
MLE Modified Ludzak-Ettinger
mmBTU metric million British thermal units
MND Mitigated 3Negative Declaration
MPN most probable number
MRP Monitoring and Reporting Program
mt metric tons
MTBE methyl tert butyl ether
N2O nitrous oxide
N/A not applicable
NAAQS National Ambient Air Quality Standards
ND non detect
ND Negative Declaration
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3
NDMA N-Nitrosodimethylamine
NESHAP National Emission Standards for Hazardous Air Pollutants NH3-N ammonia nitrogen
NL notification level
NOA Notice of Applicability
NOx nitrogen oxides
NPDES National Pollutant Discharge Elimination System
O&M operations and maintenance
OEHHA Office of Environmental Health Hazard Assessment
PCB polychlorinated biphenyls
PDWWF peak average daily wet weather flow
PF Public Facilities
PFAS per- and polyfluoroalkyl substances
PFBS perfluorobutanesulfonic acid
PFHxS perfluorohexane sulfonate
PFNA perfluorononanoic acid
PFOA perfluorooctanoic acid
PFOS perfluorooctane sulfonate
PFU plaque forming unit
PHWWF peak hourly wet weather flow
PM particulate matter
Porter-Cologne Act Porter-Cologne Water Quality Control Act POTW publicly owned treatment works
ppmv parts per million as volume
PTO Permit to Operate
RL reporting limit
RO reverse osmosis
ROW right-of-way
RWQCB Regional Water Quality Control Board
SB Senate Bill
SBCAG Santa Barbara County Association of Governments
SBCAPCD Santa Barbara County Air Pollution Control District scf standard cubic feet
SIU significant industrial user
SMR self-monitoring report
SOx sulfur oxides
SRF State Revolving Fund
State State of California
SWRCB State Water Resources Control Board
TAC toxic air contaminant
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
TCLP Toxicity Characterization Leaching Procedure
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TOC total organic carbon
TSCP Time Schedule Compliance Plan
TSO Time Schedule Order Time Schedule Order
TSS total suspended solids
TTHM total trihalomethane
USACE United States Army Corps of Engineers
VS volatile solids
Water Board Central Coast Regional Water Quality Control Board WDR waste discharge requirement
WIFIA Water Infrastructure Finance and Innovation Act
WQO water quality objective
WWTP wastewater treatment plant
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 INTRODUCTION/PLANT HISTORY

1.1 Purpose
The purpose of this Volume is to present the basis for development of the Wastewater Treatment Plant (WWTP) Master Plan for the City of Santa Maria (City). This Master Plan has a planning horizon to 2060 (35 years) and will discuss the parameters that will define the upgrades to the City's WWTP.

Chapter 1 of the Basis of Planning Volume outlines the goals and objectives for the update of the Master Plan and presents the organizational structure of the update to the Master Plan Volumes.

1.2 Plant History
The City is responsible for the collection and treatment of wastewater flows generated within the City. It also accepts septage from customers and community members, and treats flows through swap agreements with the neighboring Laguna County Sanitation District.

The City has historically seen expansions of its wastewater plant to accommodate a growing population.

Originally constructed in 1932, the plant has undergone multiple expansions, including in 1948, 1961, 1982, 1996, and 2008. The appendices include historical aerial photographs from each time period.

Prior to 1961, the plant operated with a three-stage treatment train process. The liquid process consisted of primary sedimentation followed by a biofilter, and then a secondary clarifier (this structure later became known as the intermediate clarifier). The removed sludge was stabilized in two anaerobic sludge digesters, before being deposited on sludge drying beds. Figure 1.1 shows an aerial view of the WWTP taken in 1949, and Figure 1.2 shows the plant in 1967.

Figure 1.1 Aerial View of the WWTP in 1949
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
In 1961, in response to a growing population, multiple additions were made to expand the plant's capacity. Two sets of biofilters (trickling filters) were constructed, along with two additional clarifiers, one primary and one secondary. In addition, a new sludge digester and thickener was installed as shown in Figure 1.2, which is an aerial view from 1967, which also shows additional sludge drying beds and ten percolation ponds to the west of the treatment facilities.

Figure 1.2 Aerial View of WWTP in 1967
In 1980, additional percolation ponds were developed behind the plant to allow for discharge of the treated effluent, and the earlier ponds were reconfigured. Eight larger ponds were constructed to accommodate annual average design flows of 6.5 million gallons per day (mgd). The ponds provided a discharge point for the liquid stream, and an additional level of treatment prior to reentry back into the groundwater system. Further, a new primary clarifier, grit chamber, and primary trickling filter were installed, as well as additional sludge drying beds. The plant began to recirculate its flow here, with the installation of primary and secondary trickling filter pump stations. In addition, site buildings such as the administration building, the primary sludge building, and the digester control building were constructed in this expansion.

Figure 1.3 shows an aerial view of the plant from 1981.

VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Figure 1.3 Aerial View of WWTP Taken in 1981
In 1996, the plant was expanded once again to accommodate an average daily flow of 9.5 mgd. The expansion included the addition of a new headworks screening system, a new thickener, and upgrades to the pump stations, thickeners, and other piping. Further, additional percolation ponds and sludge beds were constructed. Figure 1.4 shows an aerial photograph taken in 2006.

Figure 1.4 Aerial View of the WWTP Taken in 2006
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Most recently, in 2008, the plant expanded again to its current configuration, with a design capacity to treat an average annual flow of 12.5 mgd. This 3 mgd expansion consisted of an additional primary clarifier, an additional primary tricking filter, an additional sludge digester, and a pump station for future percolation ponds. Upgrades to the headworks also proceeded here, with one additional bar screen and a grit screw added to the process. Figure 1.5 presents an aerial view of the plant taken in 2016.

Figure 1.5 Aerial View of the WWTP Taken in 2016
The appendices include additional historical aerial views of the WWTP and historical property boundary lines.

1.3 Master Plan Drivers
In June 2023, the City received a Notice of Applicability (NOA) from the Central Coast Regional Water Quality Control Board (Water Board) informing the City of their enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements (WDR) for dischargers from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd).

The NOA terminated the individual WDR that the City had previously been operating under; Order No. R3-2010-0001, and set out new, significantly more stringent effluent discharge requirements that will require major changes to the wastewater treatment process to reach compliance. More details are provided in Volume 2, Chapter 4.

In addition to the significant discharge permit requirements in the new General Order, the WWTP has seen an increase in organic load to the plant. So, while influent wastewater flow rates have not reached levels anticipated in the last plant expansion, likely due to water conservation measures, the solids and organic loads to the plant have increased.

VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Overall, there are two major drivers for the Master Plan update. Firstly, the new General Permit effluent limits driving the need for new treatment technologies, and secondly a need to increase the plant capacity to cope with future organic and solids loads.

1.4 Goals and Objectives
The purpose of the update to the Master Plan is to evaluate the City's existing wastewater treatment system, and to provide a comprehensive update to meet the updated General Permit which the City is now operating under. The Master Plan will assess alternatives for the City regarding the expansion or new construction of the WWTP. The Plan will also make recommendations for near-term improvements, rehabilitation of the facilities, and develop financial rate structures and funding to finance the upgrades. It will provide the basis for eventual design of a new facility and assess regulatory requirements.

This Master Plan is based on a 35 year planning period to the year 2060. The update of the Master Plan will incorporate the findings and recommendations of previous and ongoing plans and studies. More specific goals for the update to the Master Plan include:
 Analyzing the Santa Maria WWTP and developing a Master Plan that:
» Complies with regulatory requirements, both in the near-term and into the future. » Does not overburden rate payers.
» Is equitable to the development community.
» Accommodates current and future growth demands of the City. » Addresses anticipated future regulatory and climatic changes.

1.5 Master Plan Organizational Structure
This Master Plan Update is organized into 12 separate volumes. Each volume title and chapter contents are listed in Table 1.1.

Table 1.1 Update to the Master Plan Volumes
Volumes and Chapter Titles
Volume 1: Executive Summary
Volume 2: Basis of Planning
Chapter 1: Introduction/Plant History
Chapter 2: Partners, Stakeholders, and Service Area
Chapter 3: Environmental Setting and Land Uses
Chapter 4: Regulatory Requirements
Chapter 5: Population, Loading, and Flow Requirements
Chapter 6: Basis of Cost Estimates and Financial Planning Considerations Volume 3: Wastewater Characterization and Process Modeling Chapter 1: Wastewater Characterization and Process Modeling Volume 4: Existing Facilities Condition Assessment
Chapter 1: Condition Assessment
Volume 5: Wastewater Collection System
Chapter 1: Wastewater Collection System
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Volumes and Chapter Titles
Volume 6: Liquid Treatment Approach for Addressing General Order Chapter 1: Screening and Evaluation of Liquid Treatment Process Alternatives Chapter 2: Screening and Evaluation of Solids Treatment Alternatives Chapter 3: Preliminary Layout Considerations and Evaluation Chapter 4: Capital and O&M Cost Development
Chapter 5: Treatment Alternative Selection
Chapter 6: Project Description
Volume 7: Water Reuse and Liquid Disposal
Chapter 1: Recycled Water Feasibility Plan
Chapter 2: Effluent Disposal
Volume 8: Biosolids Handling and Disposal
Chapter 1: Biosolids Handling and Disposal
Volume 9: Energy Management
Chapter 1: Energy Management
Volume 10: Air Quality and Emissions Odor Control
Chapter 1: Air Quality Emissions
Chapter 2: Permitting Plan
Volume 11: Capital Improvement Program and Implementation Chapter 1: Capital Improvement Program and Implementation Chapter 2: Project Delivery
Volume 12: Funding Opportunities
Chapter 1: Funding
Volume 13: Support Facilities
Chapter 1: Plant Water Systems
Chapter 2: Plant Drainage and Stormwater
Chapter 3: Instrument Air and Propane
Chapter 4: Utility Building, Maintenance, and Laboratory Chapter 5: Septage Handling
VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-1
CHAPTER 2 PARTNERS, STAKEHOLDERS, AND SERVICE
AREA

2.1 Location and Service Area

2.1.1 Climate/Geography
The Santa Maria Valley is a large coastal basin in northwestern Santa Barbara County, California, nestled between the Solomon Hills to the south, the San Rafael Mountains to the southeast, the Sierra Madre Mountains to the east, and the Pacific Ocean to the west. Figure 2.1 depicts the location of the City within Santa Barbara County and the state of California.

The area's topography is generally flat with foothills of coastal ranges to the east and a projection of transverse foothills to the north. The geology of the area consists of Paso Robles and Careaga Sand at depths typically greater than 300 feet below mean sea level, Quaternary Alluvium at depths from approximately 50 feet below mean sea level, and dune sand at the surface.

Santa Maria is located in a temperate climate, with close proximity to the Pacific Ocean. The average annual rainfall is about 12 to 13 inches with a range of low annual temperatures of near 40 degrees Fahrenheit (degrees F) to annual average highs around 80 degrees F. The WWTP is located outside of the Federal Emergency Management Agency (FEMA) 100-year flood plain, and groundwater is often found at depths of 70 feet or more below the surface, which provides low likelihood of liquefaction. The area does contain a region of perched aquifers near the airport; however, to date, perched aquifers have not been recorded near the WWTP, although geotechnical investigations in and around the percolation ponds show the presence of clay lenses of various sizes and thicknesses. The Santa Maria River drains the valley and is formed at the confluence of the Cuyama and Sisquoc Rivers.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-2
Figure 2.1 Location of Santa Maria Within the State of California

2.1.2 Service Area
The City has a service area of roughly 23 square miles with an approximate population of 110,000 people.

The City's service area is generally characterized by residential, commercial, and industrial land uses with a wastewater quality reflecting these sources. The City owns and operates both a wastewater collection system and a wastewater facility to collect and treat wastewater within their service area. The collection system is almost exclusively gravitational and flows from the east to the WWTP on the west of the City (see Figure 2.2). A portion of the wastewater generated by the Orcutt community in the south is served by Laguna County Sanitation District (LCSD), under the County. The location of the Santa Maria WWTP and the Laguna County WWTP, along with the Santa Maria city limits, are depicted in Figure 2.2.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-3
Figure 2.2 City Limits and Service Area
VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-4

2.2 Relevant Stakeholders
Relevant stakeholders can vary greatly and represent numerous groups including, but not limited to, the City and their ratepayers, regulatory agencies, private businesses, neighboring communities, and jurisdictional authorities. These various groups are often represented through municipal departments and regional agencies that have a vested interest and role in the planning and expansion of the existing WWTP. The stakeholders anticipated to play a role in the master planning and capital improvement process are as shown in Table 2.1.

Table 2.1 Relevant Stakeholders
Partners and Stakeholders
City of Santa Maria Department of Utilities
City of Santa Maria Department of Public Works
Central Coast Regional Water Quality Control Board
Laguna County Sanitation District
State of California Department of Water Resources
Santa Maria City Council
Engel and Gray Composting, Inc.

Agricultural Community
Private Landowners and Businesses
Grease, Septic, and Septage Liquid Waste Handlers
Significant Industrial Users (SIUs)
City of Santa Maria Community Development Department
City of Guadalupe
Notes:

SIU - significant industrial user
It is important that the perspectives of these stakeholders are included in the planning process.

Accordingly, the City will host stakeholder meetings to keep stakeholders informed and obtain their input and feedback as the planning process develops.

2.3 Consolidation
The implications of consolidation are numerous with potential to significantly impact future capital projects for the City's wastewater collection and treatment facilities. In-depth analysis of plausible consolidation alternatives is currently beyond the scope of this Master Plan, however some discussion of this topic is merited given recent communications with the neighboring City of Guadalupe. The City of Guadalupe has received a suggestion from the Water Board that they consider pumping their roughly

0.5 mgd of wastewater to the Santa Maria WWTP for treatment, rather than treat it themselves. This has been communicated to the City and a data request was subsequently submitted to the City of Guadalupe to obtain flow and wastewater quality information to enable an analysis to be performed. To date, the requested data has not been received.

The challenges of consolidation are clear: it will increase operation and maintenance (O&M) costs and complexity, change wastewater characteristics, and would require legal proceedings associated with the VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-5
consolidation. Further, the City's capital improvement plan would need to be revised to include the design and construction of all necessary collection and treatment improvements needed for the consolidation.

However, the positives of such a consolidation cannot be overlooked. The customer base would increase, drawing more revenue into the system and expanding the staffing pool for operations. The City of Guadalupe may improve funding prospects from federal and state sources due to their status as a disadvantaged community (DAC). Further, geographical proximity is a significant boon; the location of the current Guadalupe WWTP is only 6 miles east of the City (Figure 2.3). This proximity would reduce piping and land acquisition costs, while allowing for community coordination.

Figure 2.3 City of Guadalupe City Limits and WWTP Locations VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-6
In addition, the benefits of consolidation are important from a regulatory perspective. If both cities can maintain a single plant that has sufficient capacity to serve both communities, the regulatory burden will be centralized on one facility, reducing overall efforts to maintain regulatory compliance through the continual upkeep at the Guadalupe WWTP.

As mentioned in the beginning of this section, the possibilities for consolidation are numerous, and may not be limited to the City of Guadalupe. The LCSD, who already have flow agreements with the City (discussed in the next section), may also offer some type of consolidation potential. LCSD has recently expanded their WWTP in 2023/2024, and thus may have additional capacity to accept flows from Santa Maria, although a limitation that LCSD has is the capacity to discharge effluent. Current effluent discharge is limited by the number of reuse customers.

The interim consolidation potential for LCSD may best be considered from the City's perspective. If the City proceeds with expansion, some of their current flows in this interim period of construction could be sent to the LCSD plant to address potential issues with biochemical oxygen demand (BOD) loading in the interim phase until construction. Treated effluent would need to be returned to the City's percolation ponds for disposal, making this a less attractive option.

Further investigation and an expanded master plan into the potential benefits of consolidation for the City would be needed if future agreements with neighboring wastewater entities are to be pursued.

2.4 Laguna County Sanitation District Agreement
It is important for the context of this Master Plan to discuss the current agreement LCSD has with the City.

LCSD currently operates a WWTP about 4 miles south of the Santa Maria WWTP, adjacent to Black Road.

The current agreement, signed in 2017, will proceed in effect until 2057, barring any changes by either party. The agreement is meant to use sewer lines owned by either entity to optimize the effect of gravity flows to either site. In Figure 2.4, the areas highlighted as Exhibit A1 and Exhibit A2, both located in the Santa Maria city limits, send flow to LCSD. The area labeled as Exhibit B, which is within the LCSD service area, has its flow diverted to Santa Maria WWTP. It is anticipated in the future that the area shown in Exhibit A1 will eventually be incorporated into the Laguna County Service Area.

The locations of the Exhibits and the destination of their respective flows are subject to change pursuant to piping upgrades and developments. The existing agreement provides a legal basis to make changes. It is expected that some of the Exhibits and the flows from each will be changed based on future plant capacities and locations.

As a result of the agreement, the City receives about 0.2 mgd of net flow from Laguna County unincorporated areas at a cost of about $1.85 per 1,000 gallons in Fiscal Year 2021-2022.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-7
Figure 2.4 Land Areas Adjudicated Between LCSD and Santa Maria WWTP The importance of this agreement and this coordination between the two districts provides a future basis for cooperation between the two agencies. Considering the existing network of sewer lines and the proximity of the two treatment plants, future increases of net flows may be an option as an interim or permanent approach for achieving effluent permit limits.

2.5 Land Acquisition, Leases, and Property
The City intends to minimize the annexation and purchase of additional property for the development of any wastewater plant expansion. As a result, it must maximize the current property it owns. Figure 2.5 below illustrates the current property owned by the Santa Maria WWTP for use in expansion of facilities.

It is important to highlight the right-of-way (ROW) established on Black Road. There exist multiple state facilities allocated to that corridor, including a fiber optic cable, and a 42-inch diameter State Water Project pipeline. The total ROW currently allotted to accommodate the projected future uses along this easement spans 110 feet. Currently, the California Department of Water Resources easement is slated at 30 feet, the fiber optic cable easement is at 20 feet, and the future Black Road ROW is set at 60 feet.

Figure 2.6 illustrates the easement area. Further, the City has discussed potential plans for a road-widening project at Black Road, and a potential expansion into a full arterial of the street. As such, future expansions must consider this development, along with access points into a potential new facility east of the existing plant, north of Stowell Road.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-8
Figure 2.5 Existing Property Owned by the Santa Maria WWTP for Potential Use in Facility Expansion VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-9
Figure 2.6 Existing Easements and ROW Present Alongside Santa Maria Property Line VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-10
Currently, the land area east of Black Road and north and south of Stowell Road, is leased by the City to Agro-Jal Farming Enterprises, as shown in Figure 2.7. The current lease extends to December 31, 2028, and considering potential construction and permitting activities, may be cancelled by the City with nine months' written notice. Additional time allotted to notification of the lease termination may be necessary to reduce the negative impacts on Agro-Jal. It will be critical to consider the existing lease agreements when beginning any construction scheduling.

Figure 2.7 Existing Property Leased to Agro-Jal Enterprises VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-11
The roughly 233 acres east of Black Road owned by the City should be adequate for any plant expansion, including additional percolation pond area, through the planning horizon of 2060. However, the concerns posed to any individual and corporate landowners surrounding the site are important to consider during the planning and design phases of the project, both now and into the future. Community engagement will be a core feature of this planning process to educate ratepayers on the need for any proposed improvements, and to minimize any impacts the construction will have on the surrounding community.

To assist with this the Master Planning process includes preparation of review documentation pursuant to the California Environmental Quality Act (CEQA), as well as the necessary environmental documentation to satisfy the requirements of the Clean Water State Revolving Fund (CWSRF) Program Operating Agreement between the United States Environmental Protection Agency (EPA) and the State Water Resources Control Board (SWRCB); called CEQA plus. Further details are presented in Volume 2, Chapter 3.

2.6 Conclusion
The success of this project moving forward is dependent on productive coordination across all relevant stakeholders. Spearheaded by the City, the consultation of multiple agencies and individuals across all stages of the planning and construction phase will allow for a solution that is satisfactory to all and achieves the objectives of the project well into the future.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-1
CHAPTER 3 ENVIRONMENTAL SETTING AND LAND USES

3.1 Introduction
The environmental setting and existing land use of Santa Maria is important to evaluate. Land use availability, future growth, and potential historical or archaeological sites may affect expansion and construction of the Santa Maria WWTP.

The available and existing land use of the Santa Maria WWTP property play a large factor in the constructability and the permitting process for any proposed plant expansion. Further, any archaeological, biological, and historical resources that may be identified within the designated land area of the plant may affect the construction activities on the site.

As noted in Volume 2, Chapter 2, this Master Planning process includes preparation of review documentation pursuant to the CEQA, as well as the necessary environmental documentation to satisfy the requirements of the CWSRF Program Operating Agreement between the EPA and the SWRCB; called CEQA Plus. Details are provided in Volume 13 – CEQA/Environmental Process. The following sections summarize previous Environmental Impact Reports (EIRs) and their impacts, summarize the existing biological resources in the project area, and give a general overview of land use in the City and in the property currently slated to accommodate the plant expansion.

3.1.1 Environmental Impact Reports
Under California state law, if a project may cause a significant and unavoidable environmental impact, an EIR is required. Within the EIR, alternatives to the development are analyzed, and possible mitigation efforts provided. If no impacts exist, a Negative Declaration (ND) or a Mitigated Negative Declaration (MND) may proceed, and the project will not require an EIR. In 2006, an EIR was developed for the 2008 plant expansion due to the unavoidable and unmitigable effect on land currently used for agriculture.

Figure 3.1 indicates the areas that were evaluated as part of the 2006 EIR.

As of 2025, most of the proposed facilities east of Black Road (percolation ponds, a corporate yard, and an impound yard) were not built. The sole proposed facility that was constructed was the Santa Maria campus of the Santa Barbara Humane Society, an animal shelter. The remainder of the unused land is used for agriculture. The Humane Society building was constructed in the area of the Impound Yard designation in Figure 3.1.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-2
Figure 3.1 Land Areas Evaluated for Use as Part of the 2006 EIR The following list indicates the adverse environmental impacts identified in the 2006 EIR:
 Agricultural Resources (Significant and Unavoidable):
» Loss of prime agricultural farmland with construction of wastewater facilities and structures.  Aesthetics (Significant but Mitigable):
» New structures obstructed views and introduced glare and light to a trafficked area.  Biological Resources (Significant but Mitigable):
» Potential disturbance and loss of habitat for the California red-legged frog.  Geology and Soils (Significant but Mitigable):
» High susceptibility to "ground shaking" in the area could destabilize slopes. » Erosive soils in the area are susceptible to increased erosion from construction.  Air Quality (Significant but Mitigable):
» Construction related particulate emissions would increase during construction.

The 2006 EIR presented feasible mitigation measures to counteract the environmental effect on each category. These mitigation proposals were to be implemented during plant construction, but as noted above, none of the facilities east of Black Road were constructed.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-3
The 2006 EIR provides a good platform for the current CEQA work that will again look at constructing new facilities east of Black Road.

3.2 Land Use

3.2.1 City Land Use
As described in Chapter 2 of this Volume, the City is located in northwestern Santa Barbara County in southern California. Per the 2020 Census, the City has a population of 107,000, and is known for its agricultural uses. As part of a comprehensive General Plan update sponsored by the City, the City outlines existing land use as a benchmark for future development. In this memorandum, updated in 2022, the following land use designations are presented. Note that the acreages and proportions are as of 2022 and are subject to change. Table 3.1 highlights the existing land-use percentages in the City allocated to each desired use. Figure 3.2 highlights the associated land-use categories overlaid on the City limits.

Table 3.1 Land Use Percentages - 2020
Land Use Type Existing Acreage(2) Percentage of City Total Residential 3,486 27.3
Commercial 948 7.4
Industrial 1,082 8.5
Airport 1,411 11.1
Public 1,408 11
Conservation and Agricultural 1,828 14.3
Other/Special(1) 2,589 20.3
Notes:
(1) Other indicates vacant or private right of way land. (2) Source is from the 2022 General Plan update.

In addition to the land uses presented above, Santa Maria had provided projections for possible development scenarios for the City. The three development scenarios are defined below:

1. Alternative A - Annexation:

City growth will proceed through annexation of neighboring land, and be illustrated through the continuation of existing outward growth patterns. Employment will proceed along existing employment centers near the US-101.

2. Alternative B - Infill:

City growth will proceed with an overhaul of existing zoning regulations and patterns, where higher density buildings and plots will proceed on existing City land. Employment growth will occur along existing centers, with higher-density units and plazas. No annexation or growth in land would occur in this alternative.

3. Alternative C - Hybrid:

City growth will proceed with a mix of zoning changes and annexation, where some land is annexed for employment and commercial centers, and where existing residential usage is densified with more permits and accessory dwelling unit (ADU) developments.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-4
Projections of the growth of each land use category were identified in the memorandum in the Santa Maria General Plan. Based on the alternatives defined above, Figure 3.2 indicates the total number of acres dedicated to each form of land use compared with the 2020 land use figures presented in Table 3.1.

As can be seen in Figure 3.2, across each alternative, an increase in residential acreage is expected. This means that more sewer connections and more land use will be designated for homes and domestic uses.

Note too, the increase in the allocation of industrial space for any future growth of employment centers across each projection. More agricultural/conservation space is also expected to accommodate any growth in the agricultural sector.

The data in Figure 3.2 also shows that commercial and public space will remain stagnant or decrease in land acreage due to density increases.

Figure 3.2 Land Use Planning Alternatives (2020 General Plan Update) Figure 3.3 shows the zoning map for the City, indicating where the various zones are located. Currently, the property owned by the City around the WWTP and the area to the east of Black Road is zoned as Public Facilities. As noted in Chapter 2, the area to the east of Black Road is currently leased to a local farming operation.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-5
Figure 3.3 Zoning Map in Santa Maria
VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-6

3.2.2 WWTP Property Land Use
The existing WWTP occupies most of the area within the City's property line to the west of Black Road, as indicated in Figure 3.4. Moving forward the City will, at a minimum, need to expand the percolation pond area and potentially other treatment facilities to the east of Black Road, which is currently used for agriculture.

Figure 3.4 Santa Maria Property Line for WWTP Expansions VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-7
The WWTP expansion will likely take place primarily in the area north of West Stowell Road. The total property area on both sides of Black Road is 461.12 acres, encompassed by the yellow solid lines in Figure 3.4. Note that the property boundary extends a little further south of Stowell Road than is shown in Figure 3.4.

Table 3.2 indicates the areal use and land cover types for the property site.

Table 3.2 Current Land Uses in WWTP Area
Vegetation / Land Cover Type(1) Acreage(2)
Irrigation Ditch 0.91
Disturbed 18.7
Agricultural Row Crop 220
Developed 222
Total 461
Notes:
(1) Adapted from LSA Consultant Memorandum (Table A, Appendix F). (2) Acreages are approximate and based on geographic information system measurements.

In addition, the WWTP property is characterized by flat, cultivated agricultural lands. The Santa Maria Valley is underlain by a groundwater basin that experiences groundwater flow from a west to southwest direction. There exists a seismic fault called the Casmalia fault approximately 4.5 miles south of the site.

As noted, the site is currently zoned as Public Facilities (PF). However, due to the leasing agreements, the area to the east of Black Road is currently utilized as Agriculture, and is leased by Agro-Jal Farming Enterprises. Note that the area directly surrounding the City property to the east and west is outside city limits.

The soils in the area, as represented by the memorandum in Appendix F, are classified primarily by sandy loam to loamy sand. Table B in Appendix F provides more information on soil areas.

3.3 Preliminary Resource Analyses

3.3.1 Biological Resources
As part of the master planning effort, a preliminary analysis of biological resources within the existing property line of the WWTP was completed by LSA Associates, Inc. An important objective of the survey was to provide a baseline understanding of the resources in the project area, and to identify any "special-status" species under existing laws that may affect construction of new facilities.

The memorandum provides a biological survey of the site location to document the potential presence of sensitive biological resources. Biological resources include soils, plant and animal species, along with habitat for potentially endangered species. It also includes an analysis of areas within the project site that may be subject to regulatory actions.

The memorandum is included in Appendix F and summarized below.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-8

3.3.1.1 Memorandum Summary
LSA completed a literature review and a field survey of the designated WWTP project area.

The survey indicated the following:
 The project site may support nine special-status animal species and nesting birds within the project site due to the presence of suitable habitat for those species.  The project site does not support special-status plant species or sensitive natural communities.  The project site does not support critical habitat or wildlife movement corridors, and construction activities will not impede any corridors.
 WWTP treatment ponds are not considered to be jurisdictional aquatic resources. As a result, they are exempt from existing United States Army Corps of Engineers (USACE) and California Department of Wildlife (CDFW) regulations. However, they may be included in the regulations highlighted in the Porter-Cologne Act.
 There are no protected trees located within the project site, in accordance with City of Santa Maria General Plan Policy 3.

Completed mitigation and impact analyses for biological resources will proceed later to support the CEQA review process once the details of design and construction are finalized.

A list of the special status species is shown here:

1. California tiger salamander (Ambystoma californiense) - Santa Barbara County Distinct Population Segment (DPS) 2 – federally endangered and state listed as threatened.

2. California red-legged frog (Rana draytonii) - federally threatened and CDFW Species of Special Concern.

3. Western spadefoot (Spea hammondii) - proposed as federally threatened and CDFW Species of Special Concern.

4. Southwestern pond turtle (Actinmys pallida) - proposed as federally threatened and CDFW Species of Special Concern.

5. Tricolored blackbird (Agelaius tricolor) - State listed as threatened.

6. Northern California legless lizard (Anniella pulchra) - CDFW Species of Special Concern.

7. Coast horned lizard (Phrynosoma blainvillii) - CDFW Species of Special Concern.

8. Western burrowing owl (Athene cunicularia) - CDFW Species of Special Concern.

9. Yellow warbler (Setophaga petechia) - CDFW Species of Special Concern.

A full list of all the species identified in the project area are shown in the full memorandum in Appendix F.

3.3.2 Cultural Resources
An updated cultural resources analysis was not completed at this preliminary stage. This section summarizes the archaeological and cultural issues highlighted in the 2006 EIR. In that EIR, a literature review and field analysis of any excavated areas was conducted to assess any potential items of cultural significance in the area.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-9
Cultural resources, as defined by California law, are buildings, sites, structures, or objects that may have historical, prehistoric, archaeological, or cultural importance. Site disturbances such as those seen in construction have the potential to cause adverse effects to these sites.

In the 2006 EIR, there were no historical resources designated within the project area of the WWTP expansion. In any updated analyses and EIR's for plant expansions, it will be important to assess any newly developed structures that may have developed cultural significance on the property.

Further, considering the age of some of the structures currently in operation at the WWTP, an assessment of the cultural impact of those existing structures may be completed in the context of CEQA.

Other potential resources on the property include:
 Paleontological Resources - no human remains or Native American tribal remains/artifacts have been found on the property.
 Geological Resources - No unique geological features are located on the property.  Archaeological Resources - no culturally significant resources have yet been found in the area.

Understanding the existing cultural resources around the site will allow for context during construction and permitting of any expansions.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-1
CHAPTER 4 REGULATORY REQUIREMENTS

4.1 Introduction
The City's update of the Master Plan will be used to guide the City's decisions regarding expansion and modernization of the wastewater collection and treatment facilities. In addition to estimating the additional treatment capacity required to service the needs of a growing population, the update to the Master Plan attempts to anticipate the level of treatment required by the expansion to comply with state and federal regulations both now and in the future.

The purpose of this chapter is to assess how the current and future regulations could affect planning, design, construction, operations, and maintenance decisions at the City's WWTP. The focus of this assessment is on regulations relating to updates to the General Permit, emerging contaminant regulations, future water reuse requirements, air quality permits, and biosolids disposal restrictions and regulations.

For a quick summary of the key takeaways for this chapter, please refer to Table 4.15 in Section 4.6.

4.2 Water Quality
The following sections summarizes both current and potential future federal, state, and local regulations related to liquid streams, and describes the potential impact on the City's WWTP. It also summarizes the City's new WDR permit and its effects on treatment requirements.

4.2.1 Regulatory Setting and Overview
The water quality regulations that govern operation of the City's WWTP are described in the following sections.

4.2.1.1 Porter-Cologne Water Quality Control Act
The Porter-Cologne Water Quality Control Act (Porter-Cologne Act, California Water Code Division 7) implements a comprehensive program to protect water quality and beneficial uses of surface waters, wetlands, and groundwaters of California. The Porter-Cologne Act prohibits the disposal of waste in a manner that causes or threatens to cause pollution, contamination, or nuisance, including the discharge of waste into groundwater or in areas where it may enter surface water or groundwater (California Water Code Section 13050(l)).

The Porter-Cologne Act established the nine Regional Water Quality Control Boards (RWQCBs) with oversight provided by the SWRCB. The SWRCB and the RWQCBs have enforcement authority, adopt water quality policies, and issue permits to regulate the discharge of pollutants into state waters. National Pollutant Discharge Elimination System (NPDES) permits are issued by the state but are part of the federal Clean Water Act (CWA) program and regulate discharges to waters of the United States. WDRs, on the other hand, are state-level regulations that cover discharges to land or groundwater. The SWRCB adopts statewide plans, policies, and permits. The RWQCBs designate beneficial uses for all water bodies within VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-2
their regions, assign water quality objectives (WQOs) to protect those beneficial uses, and adopt plans and policies specific to their hydrologic regions. The beneficial uses and WQOs are identified in the Water Quality Control Plans (or Basin Plans) that are adopted and periodically revised for each region. Each Basin Plan also includes the applicable policies adopted by the SWRCB.

4.2.1.2 Antidegradation Policy (SWRCB Resolution No. 68-16) New or changed waste discharges to California waters that may potentially degrade high quality water are only allowed if the change in water quality "(1) will be consistent with maximum benefit to the people of the State of California (State), (2) will not unreasonably affect present and anticipated beneficial use of such water, and (3) will not result in water quality less than that prescribed in state policies (e.g., WQOs in Water Quality Control Plans)". Such discharges are required to meet WDRs through application of best practicable treatment or control necessary to ensure that pollution or nuisance is avoided and that the discharge will not “unreasonably impact present and anticipated beneficial uses of the water."

4.2.1.3 Sources of Drinking Water Policy (SWRCB Resolution No. 88-63) Per the Sources of Drinking Water Policy, all surface waters and ground waters in California are designated with the beneficial use of municipal or domestic water supply (MUN) except for:

1. Surface and ground waters where:
a. The total dissolved solids (TDS) exceed 3,000 mg/L (milligrams per liter) (5,000 microsiemens per centimeter, electrical conductivity) and it is not reasonably expected by Regional Boards to supply a public water system, or
b. There is contamination, either by natural processes or by human activity (unrelated to the specific pollution incident), that cannot reasonably be treated for domestic use using either Best Management Practices or best economically achievable treatment practices, or c. The water source does not provide sufficient water to supply a single well capable of producing an average, sustained yield of 200 gpd.

2. Surface waters where:
a. The water is in systems designed or modified to collect or treat municipal or industrial wastewaters, process waters, mining wastewaters, or storm water runoff, provided that the discharge from such systems is monitored to assure compliance with all relevant WQOs as required by the Regional Boards, or
b. The water is in systems designed or modified for the primary purpose of conveying or holding agricultural drainage waters, provided that the discharge from such systems is monitored to assure compliance with all relevant WQOs as required by the Regional Boards.

3. Ground water where:
a. The aquifer is regulated as a geothermal energy producing source or has been exempted administratively pursuant to 40 Code of Federal Regulations (CFR) Section 146.4 for the purpose of underground injection of fluids associated with the production of hydrocarbon or geothermal energy, provided that these fluids do not constitute a hazardous waste under 40 CFR Section 261.3.

These stipulations govern the designation of MUN beneficial use for waterbodies and determine the regulatory restrictions that are triggered for discharges to these waterbodies.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-3

4.2.1.4 Water Quality Enforcement Policy (SWRCB Resolution No. 2023-0043) The SWRCB Water Quality Enforcement Policy outlines a transparent, fair, and consistent statewide program for enforcing requirements specified in the Porter-Cologne Act. The Water Quality Enforcement Policy establishes a process for ranking enforcement priorities, reaffirms progressive enforcement, provides a methodology for assessing administrative civil liabilities, recognizes the value of using alternatives to financial penalties (e.g., supplemental environmental projects), addresses the eligibility of small communities to implement compliance projects (rather than paying mandatory penalties), and establishes annual enforcement and planning requirements. The Enforcement Policy underwent a review in 2023 and was adopted on November 7, 2024.

4.2.1.5 Water Quality Control Plan for the Central Coast Basin The Water Quality Control Plan for the Central Coast Basin (Central Coast Basin Plan) is reviewed by the Regional Board at least every three years and updated as needed to incorporate water quality issues of concern and incorporate regulatory changes implemented by the SWRCB and EPA. The current version of the Central Coast Basin Plan is dated June 2019 and amendments are underway that will add pesticide water quality criteria and incorporate total maximum daily loads for various water bodies. The Santa Maria WWTP discharges to groundwater, specifically the Upper Guadalupe Sub-Area of the Santa Maria River Valley Groundwater Basin. The Central Coast Basin Plan designates the following beneficial uses for all groundwater within the Central Coast Basin: MUN, Agricultural Supply (AGR), and Industrial Service Supply (IND). The WQOs assigned for the MUN beneficial use include narrative objectives for taste and odor, as well as numeric WQOs for bacteria, primary maximum contaminant levels (MCLs), and radioactivity.

The WQOs assigned for the AGR beneficial use include irrigation guidelines from the University of California Agricultural Extension Service (Basin Plan Table 3-1) and specific objectives for irrigation and livestock watering (Basin Plan Table 3-2). In addition, WQOs are assigned to specific groundwater basins (Basin Plan Table 3-6). The median groundwater objectives for the Upper Guadalupe Sub-Area of the Santa Maria River Valley Groundwater Basin apply to discharges from the WWTP. See Appendix G for the numerical values associated with the WQOs.

4.2.2 Current Regulations and Practices
The Santa Maria WWTP receives wastewater from the City, the Santa Maria Airport District, and a part of the Laguna County Sanitation District. Secondary treatment is accomplished using trickling filters and the effluent is transported to percolation ponds for disposal.

4.2.2.1 General Order Waste Discharge Requirements (Order No. R3-2020-0020) Operation of the WWTP is currently regulated by General WDR Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 gpd. On June 16, 2023, the City received a NOA to enroll in the General Order WDR, replacing the previous individual WDR (Order No. R3- 2010-0001). The NOA implements applicable provisions of the General Order WDRs (i.e., discharge prohibitions, effluent limits for trickling filter systems, percolation pond disposal, pretreatment program, sludge handling/biosolids disposal).

In addition, Monitoring and Reporting Program (MRP) Order No. R3-2023-0032 was transmitted with the NOA that specifies monitoring locations, constituents, and sampling frequencies to demonstrate VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-4
compliance with the General Order WDRs. The NOA and the MRP prescribe requirements consistent with the Central Coast Basin Plan, Porter-Cologne Act, and SWRCB plans and policies. The City's NOA and MRP are included in Appendix H. Under the previous individual WDRs, the City was reporting carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) results for effluent limit compliance.

After the NOA was received by the City, ongoing communications and discussions have taken place between the City and the Water Board. The following timeline highlights the major developments with regard to finalization of the City’s new General Order discharge permit requirements:

1. June 16, 2023 - The City received the NOA to enroll in General Order No. R3-2020-0020, updating the permit from the previous R3-2010-0001 that had governed the WWTP operation. a. The NOA provided the City two years to reach the targets stated in the new General Order. The interim limits are shown in Table 4.1.
b. After the two-year target, on June 16, 2025, the City was required to comply with the final limits shown in Table 4.2.

Table 4.1 City WWTP Interim Effluent Limitations (until June 16, 2025) and Historical Water Quality Parameter Unit Limit -
30-Day Average
Limit -
Daily Maximum
Historical Average
(2018-2023)
Annual Average
for 2022
BOD5 mg/L 60 100 44.4 CBOD(1)

70.1 BOD5
45 (CBOD)
TSS mg/L 60 100 38.6 37
Settleable Solids mL/L 0.1 0.4 <0.1 <0.1
TDS(2) mg/L 1,000 N/A 844 1,055
Sodium(2) mg/L 180 N/A 145 140
Chloride(2) mg/L 180 N/A 156 143
pH N/A 6.5 to 8.4 6.5 to 8.4 8 7.8
Notes:

BOD5 - 5-day biochemical oxygen demand; mL/L - milliliters per liter; N/A - not applicable (1) The City historically measured CBOD rather than BOD₅ for compliance. CBOD value shown is an average of 2018 to 2023. (2) Compliance is based on a three-year running mean.

Table 4.2 City WWTP Final Effluent Limitations (After June 16, 2025)(1)(2) Parameter Unit 30-Day Average 7-Day Average Sample Maximum BOD5 mg/L 30 45 N/A
TSS mg/L 30 45 N/A
Settleable Solids mL/L 0.1 0.3 0.5
pH N/A Between 6.5 and 8.4 N/A N/A
Notes:
(1) Timeline modified per the TSCP submitted to the Regional Water Board in June 2024. (2) Additional limits apply. See Table 4.3.

Since the City would not be able to comply with a number of the final effluent limits, the City has begun planning to design upgrades to the WWTP to address the effluent BOD5, TSS, and total nitrogen requirements, which is the driver for development of this Master Plan.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-5
Accordingly, because the City would require more than the two-year timeframe to achieve compliance with the effluent limitations, the City developed a Time Schedule Compliance Plan (TSCP), a requirement of the MRP.

1. January 2024 - The City had a meeting with the Water Board to discuss concerns about meeting the deadlines presented in the NOA and the presented progress that had already been made with respect to the Master Plan and development of the TSCP.

2. June 2024 - The City submitted a TSCP to the Water Board, highlighting actionable steps the City would take to reach the effluent targets stated in Table 4.2. A copy of the TSCP is included in Appendix I.
a. The TSCP indicated that the WWTP will be unable to meet BOD, TSS, and total nitrogen limits by June 2025, as specified in the General Order, and requested a time extension to achieve this. b. Actionable steps included the development of a TDS Source Water Improvement Study, a pilot tertiary filtration project to evaluate interim BOD removal, evaluation of percolation pond performance, and ongoing development of a Master Plan to modify and expand the WWTP to meet the new more stringent effluent discharge limits.

The General Order WDRs provide two options for compliance with the groundwater basin-specific limits.

Option 1 is to comply with effluent limits assigned for the designated groundwater basin. These effluent limits would be in effect after June 16, 2025. Option 2 is to implement a groundwater monitoring program and demonstrate the discharge does not cause underlying groundwater to exceed the groundwater basin-specific WQOs. The City was required to select either Option 1 or Option 2 by June 16, 2024, in the TSCP.

The Water Board also stated in the NOA that the current monitoring well network is not adequate for the assessment of upgradient background water quality and/or downgradient water quality trends for the City's wastewater disposal operations. Therefore, if Option 2 was selected, the City would need to submit a groundwater monitoring workplan and a hydrogeologic conceptual site model for RWQCB approval.

The new monitoring wells would need to be installed in shallow groundwater with at least three wells proposed in locations to represent upgradient, underlying, and downgradient groundwater quality.

In addition to not being able to comply with the final effluent limits for BOD5 and TSS, there was concern that the WWTP may not be able to comply with all the groundwater limitations in Option 2. A review of historical groundwater monitoring is presented in Appendix J. In the analysis, the three constituents that consistently measured over the groundwater objective for the Upper Guadalupe Sub-Area Basin were nitrogen, chloride, and TDS. For nitrogen, all well groundwater concentrations were above the median groundwater objective of 1.4 mg/L. Over the time period between 2018 and 2023, total nitrogen concentrations in the monitoring wells were measured over the observed background concentration 18 separate times. The average effluent nitrogen concentration was 43 mg/L. The groundwater data also showed issues with chloride and TDS, where the groundwater concentrations sampled were near or slightly above the groundwater basin objective.

Based on the analysis, Option 1, compliance with the effluent discharge limits, was selected for final compliance.

Table 4.3 shows the groundwater basin limits for the Upper Guadalupe Basin applicable for Options 1 and 2, the only difference being the total nitrogen limit of 10 mg/L for Option 1 and 1.4 mg/L for Option 2.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-6
Table 4.3 Upper Guadalupe Groundwater Basin Options for Final Compliance (After June 16, 2025) Constituent Unit Effluent Limitation (Option 1)(1) Groundwater Limitation (Option 2)(1) Boron mg/L 0.5 0.5
Chloride mg/L 165 165
Nitrogen, Total (as N) mg/L 10 1.4
Sodium, Total mg/L 230 230
Sulfate mg/L 500 500
TDS mg/L 1,000 1,000
Notes:
(1) Limitations are a 25-Month Rolling Median (mg/L).
(2) Option 1 was selected in the TSCP for compliance.

1. June 16, 2025 - The new effluent discharge limits (Table 4.2) became effective. But, as noted above, the WWTP is not able to achieve these limits, and the City began reporting violations of the limits in their quarterly Self-Monitoring Reports (SMRs).

2. September 2025 - The City submitted the TDS Source Water Improvement Study to the RWQCB.

A copy is included in Appendix K.

3. October 2025 - The Water Board accepted the results of the percolation pond investigation, updating the WWTP disposal limit to a monthly limit of 8.3 mgd to replace the daily average limit of 8.0 mgd.

4. November 2025 - The Water Board issued a Draft Time Schedule Order (TSO) for the City’s review.

This would take the place of the TSCP, once approved. The City responded to the Water Board with comments, and the revised TSO was issued for public comment in December 2025.

5. February 5, 2026 - The Water Board issued the final TSO, extending the interim effluent limits for BOD, TSS, and total nitrogen to a new final compliance date of September 30, 2034. The new Interim Effluent Limits are shown in Table 4.4. A copy of the Final TSO is included in Appendix L.

Table 4.4 Interim and Final Compliance Limits for BOD, TSS, and Total Nitrogen - Time Schedule Order (February 2026)
Constituent Unit New Interim Limits
(extended until September 30, 2034)
Final Limits
(after September 30, 2034)
BOD5
(1) mg/L 119 30
TSS(1) mg/L 43 30
Nitrogen, Total (as N)(2) mg/L 55 10
Notes:
(1) Limitations are a 30-day average (mg/L).
(2) Limitations are a 25-Month Rolling Median (mg/L).

The TSO does not exempt the WWTP from the limits of other constituents specified in the General Order, shown in Tables 4.2 and 4.3. It only applies to the constituents shown in Table 4.4. Limits for all other constituents are currently in effect.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-7

4.2.2.2 Monitoring and Reporting Program (Order No. R3-2023-0032) A project-specific MRP was included with the NOA that includes requirements to evaluate performance of the Santa Maria WWTP and demonstrate compliance with effluent and receiving water limitations. The City is required to conduct influent and effluent monitoring for technology-based effluent limits, nitrogen compounds, and minerals and water supply monitoring for nitrate and minerals (see Appendix H).

Percolation pond monitoring is required weekly to measure freeboard and monthly to evaluate dissolved oxygen, color, vegetation in the ponds, and berm condition.

As part of the MRP requirements, the City was required to prepare a Climate Change Adaptation Plan, which was prepared and submitted as a draft report to the Regional Water Board in July 2025. A final copy of this report is included as Appendix M.

4.2.3 Future Regulations
Future regulations applicable for operation of the Santa Maria WWTP include possible new effluent limits, prohibitions, and receiving water limits. Obtaining a credit for groundwater recharge within the adjudicated Santa Maria River Valley Groundwater Basin may require compliance with Title 22 indirect potable reuse (IPR) regulations (Article 5.1 Groundwater Replenishment - Surface Application).

Compliance with IPR regulations would include effluent limits for total organic carbon (TOC), requirements for pathogen removal, groundwater modeling to determine underground travel time to the nearest potable well, and monitoring for constituents of emerging concern (CECs).

As the groundwater basin is a drinking water source, all MCLs are applicable to the groundwater. The City may periodically monitor effluent and groundwater quality to evaluate if the effluent is contributing to any exceedances of MCLs in the groundwater basin. As more CECs, such as per- and polyfluoroalkyl substances (PFAS) compounds, are regulated as MCLs, it is possible the City's effluent could be a source of contamination to the groundwater basin. Compliance with any MCL will be in the groundwater, down gradient of the percolation ponds, and incorporating groundwater mixing. However, source control and/or treatment to remove emerging contaminants in the final effluent waste stream may be required.

Constituents of interest for future regulations are described in Table 4.5. Possible WQOs (current and future) applicable for the City's WWTP percolation pond operations are provided in Appendix N.

Table 4.5 Constituents of Interest for Future Regulations Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Phenol Phenol is a chemical component that exists in the environment from natural and anthropogenic
sources (e.g., manufacturing and industrial
wastes, combustion emissions, and tobacco
smoke) and is toxic to neurological development
and reproductive systems in humans.

Under Option 2, the NOA specifies
groundwater monitoring annually for
these three constituents with a
reduction to once in five years if not
detected in the initial sample.

Effluent monitoring may be required
if detected in groundwater. Formaldehyde Formaldehyde is a chemical compound found in some man-made products and, when released
into the air, can pose a carcinogenic risk to
humans.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-8
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Zinc The predominant anthropogenic sources of zinc
are from paints, galvanized materials, and tires.

Concentrations of zinc above WQOs can be toxic
to aquatic organisms and negatively impact
beneficial uses of California waters.

Chromium VI Hexavalent chromium, or Chromium VI, is a heavy metal that has been used in industrial applications
and can occur naturally in the environment. It is
known to be carcinogenic and toxic to the liver.

New MCL and DLR adopted on
April 19, 2024.

Mercury Concentrations of mercury can exceed naturally
existing background concentrations from human
activity (e.g., metal processing, coal incineration,
medical and other waste, and mining), and
negatively impact the beneficial uses of waters of
the state by making fish unsafe for human and
wildlife consumption. Mercury has been observed
to cause renal failure and negatively affect the
nervous system.

SWRCB identified priority to
develop a new MCL for mercury.

Selenium Anthropogenic sources of selenium are primarily from agricultural irrigation practices. Elevated
selenium levels can be toxic to fish and
aquatic-dependent birds.

No regulatory changes proposed,
but a typical groundwater concern.

TTHMs (bromoform,
chloroform, DBCM, DCBM)
TTHMs are a group of chemicals released into the
environment as disinfection byproducts and are
associated with increased cancer risk.

Drinking water MCLs for TTHMs,
HAA5s, bromate and chlorite exist.

SWRCB identified priority to
develop new MCLs for disinfection
byproducts. HAA5 (monochloroacetic acid,
dichloroacetic acid,
trichloroacetic acid,
monobromoacetic acid,
dibromoacetic acid)
HAA5 are a group of chemicals released into the
environment as disinfection byproducts. These
compounds can be toxic to DNA and increase
cancer risk.

Bromate Bromate is released into the environment as a
disinfection byproduct, when source waters
containing bromide are treated with ozone or
sodium hypochlorite. It can be toxic to DNA and
increase cancer risk.

Chlorite Chlorite is released into the environment as a disinfection byproduct, when source waters are
treated with chlorine dioxide. Chlorite toxicity can
cause red blood cell damage, hormone
dysfunction, and potentially delay
neurodevelopment.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-9
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Aluminum Anthropogenic sources of aluminum include
coagulation water treatment processes (e.g., via
aluminum sulfate), as well as leaching of
aluminum-containing waste streams (e.g.,
consumer goods, and waste incineration).

Aluminum is a non-essential metal and poses a
potential risk to human health. High
concentrations of aluminum above health
guidelines have been linked to certain
neurogenerative disorders.

No regulatory changes proposed,
but a typical groundwater concern.

Manganese Manganese is a naturally occurring element in the environment but is also released into the
environment from human activities such as mining
and industrial discharges. High manganese
concentrations can pose a neurotoxic risk,
particularly in children (e.g., cognitive disabilities
in children, and Parkinson's-like symptoms in
adults).

Manganese has a Secondary MCL
in California of 0.05 mg/L. SWRCB
proposed lower NL and RL on
February 16, 2023.

Perchlorate Anthropogenic sources of perchlorate
predominate from fuels used for rockets and
missiles. This contaminant can disrupt thyroid
function and has the greatest impact on pregnant
women and children.

Perchlorate has an MCL in
California of 0.006 mg/L. SWRCB
proposed lower DLR on April 23,
2020, and is a typical groundwater
concern.

MTBE MTBE is predominately used as a gasoline
additive. At low concentrations, MTBE present in
drinking water can cause unpleasant odor and
taste; in high concentrations studies suggest
ingestion of MTBE can cause impacts to the liver,
kidney, and the gastrointestinal and nervous
systems.

MTBE has an MCL in California of

0.013 mg/L. No regulatory changes
proposed, but a groundwater
concern.

Arsenic Arsenic is ubiquitous, commonly found in
California drinking water sources. Chronic arsenic
exposure is linked with increased risk for internal
cancers and other adverse health effects.

Arsenic has an MCL in California of

0.010 mg/L. SWRCB identified
priority to develop new MCL for
arsenic.

Cadmium Cadmium is a metal frequently used in batteries.

Chronic cadmium exposure may increase risk of
lung, prostate, and kidney cancer.

Arsenic has an MCL in California of

0.005 mg/L. SWRCB identified
priority to develop new MCL for
cadmium.

NDMA Though no longer produced or commercially used
in the United States, NDMA concentrations have
been found in drinking water sources. NDMA was
formerly used in the production of rocket fuel and
other consumer products and is also a disinfection
byproduct from water treatment. Exposure to
NDMA is linked with increased cancer risk and
liver damage.

There is no drinking water MCL for
NDMA in California, but the
SWRCB identified priority to
develop MCL for NDMA; NDMA is
also a CEC surrogate for IPR
projects.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-10
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Styrene Styrene is used primarily to make rubbers and
plastics. Exposure to styrene is known to increase
cancer risk.

Styrene has an MCL in California of

0.10 mg/L. SWRCB identified
priority to develop new MCL for
styrene.

Microplastics Microplastics are becoming more prevalent in the environment. Although numerous studies are
ongoing, initial studies suggest that microplastics
have an impact on human and animal health.

Microplastics also contain chemical additives
which when ingested may cause health concerns.

The Federal EPA formally added
microplastics to the draft
Contaminant Candidate List 6
(CCL 6), initiating a process for
integrating microplastics into future
regulations under the Safe Drinking
Water Act.

The California State Water Board
has adopted a standard
methodology for the testing and
reporting of microplastics for
potential future limits.
1,4-Dioxane 1,4-Dioxane is a synthetic compound used as a stabilizer in industrial applications (e.g., solvents,
greases, and waxes) and has been used in
personal care products like detergents, cosmetics,
and shampoos. It is a likely human carcinogen
and does not readily degrade in the environment.

California has a NL limit of

0.001 mg/L for 1,4 Dioxane but no
MCL yet. No regulatory changes
proposed, but could be a
groundwater concern. 1,4-Dioxane
is also a CEC surrogate for IPR
projects.

PFOA
PFOS
PFBS
PFHxS
Gen X (HFPO-DA)
PFNA
These are synthetic fluorinated chemicals that
belong to a group referred to as PFAS. These
chemicals are used in consumer products to make
materials stain-resistant, waterproof, and
non-stick. Many are no longer produced in the
United States, however because they do not
readily degrade in the environment,
concentrations have been found in surface waters
and drinking water sources. Chronic exposure to
low concentrations of PFASs may result in
adverse human health effects. Exposure to
PFASs can also negatively impact developmental
and reproductive systems.

EPA approved MCLs for PFOA and
PFOS on April 26, 2024. The
SWRCB is developing Primary
MCLs with expected adoption in
2025. The MCLs for PFOA and
PFOS have a compliance date of
April 26,2029, but this can be
extended by two years for approved
system.(1) PFOS and PFOA are
also CEC surrogates for IPR
projects.

EPA approved a HI MCL for the
mixture of PFBS, PFHxS, HFPO-DA, and PFNA on April 26, 2024.

As of May 18, 2026, the EPA has
proposed rescinding the MCL for
these compounds.(1)
VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-11
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Anatoxin-a
Saxitoxins
Microcystins
Cylindrospermopsin
These include persistently detected cyanotoxins
found in California surface waters. Under the right
conditions, proliferation can cause harmful
cyanobacterial blooms, and potentially contribute
to nutrient pollution, increased temperatures, and
drought.

OEHHA submitted NL
recommendations to SWRCB on
May 6, 2021.

Notes:

DBCM - chlorodibromomethane; DCBM - bromodichloromethane; DLR - Detection Limit for Purposes of Reporting; HAA5 - haloacetic acids; HFPO-DA - hexafluoropropylene oxide dimer acid; HI - Hazard Index; MTBE - methyl tert-butyl ether; ND - non detect; NDMA - N-Nitrosodimethylamine; NL - notification level; OEHHA - Office of Environmental Health Hazard Assessment; PFBS - perfluorobutanesulfonic acid; PFHxS - perfluorohexane sulfonate; PFNA - perfluorononanoic acid; PFOA - perfluorooctanoic acid; PFOS - perfluorooctane sulfonate; RL - reporting limit; TTHM - total trihalomethane (1) On May 18, 2026, the EPA announced a proposed rule to allow public water systems to seek a federal extension for two additional years to comply with the MCLs for PFOA and PFOS; and the extension would shift the compliance date to April 26,2031, for approved systems. In the same announcement, the EPA also proposed rescinding the MCLs for PFHxS, PFNA, and GenX, the HI for mixtures of these three, plus PFBS. At the time of writing, this was the most recent announcement from the EPA.

4.2.4 Treatment Implications
Improvements to the WWTP must adequately treat the effluent wastewater constituents shown in Tables 4.2 and 4.4. Currently, the system is not able to remove nitrogen. The new liquid stream treatment system will likely include:
 Activated sludge technologies that provide BOD₅ and nitrogen removal such as oxidation ditches, Bardenpho or Modified Ludzack-Ettinger (MLE) configurations.  Improvements to the water supply or the pretreatment system to reduce the influent levels of TDS.  Continued maintenance and operation of the percolation ponds.

A detailed discussion of the treatment alternatives evaluated and the selected treatment train to be implemented to meet the requirements of the new General Order and the anticipated growth in the City can be found in Volume 6 - Liquid Treatment Approach to Addressing General Order.

4.3 Biosolids and Solids Handling
The solids handling regulations that govern the operation of the Santa Maria WWTP are summarized in the following sections.

4.3.1 Regulatory Setting and Overview - Solids Handling

4.3.1.1 Federal Regulatory Agencies
At the federal level, the EPA establishes and enforces the federal regulations that govern biosolids generated at the Santa Maria WWTP. These rules and regulations are codified in CFR Title 40: Protection of the Environment. Most of the regulations impacting wastewater biosolids are based on the implementation of the CWA. The major sections of the CFR that apply to the biosolids generated at the Santa Maria WWTP are referenced throughout this report. The EPA's Pacific Southwest region (Region 9) is responsible for implementing and enforcing these federal regulations in California.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-12

4.3.1.2 State Regulatory Agencies
At the state level, the SWRCB and the Division of Water Quality establish statewide policy and additional rules, guidelines, criteria, and regulations for biosolids beneficial end use/disposal. The California Department of Resources Recycling and Recovery (CalRecycle) also has jurisdiction over biosolids disposal as it oversees and regulates California's solid waste disposal including co-disposal issues and use of biosolids as alternative daily cover (ADC) in landfills.

4.3.1.3 Local Regulatory Agencies
At the local level, the Central Coast RWQCB (Region 3) is responsible for rulemaking, permitting, and enforcement of federal and state requirements at the Santa Maria WWTP. The Central Coast RWQCB has jurisdiction over San Luis Obispo, Santa Barbara, and Monterey counties. Additionally, Santa Barbara County has jurisdiction to institute land application ordinances at the county level.

4.3.1.4 Regulatory Overview
Similar to the treated water effluent limits, the WWTP must comply with biosolids and solids handling regulations. Table 4.6 provides an overview of the current and future biosolids regulations, codes, policies, and agreements (requirements) that apply to the biosolids generated at the Santa Maria WWTP. The following sections expand on these requirements.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-13
Table 4.6 Summary of Solids and Biosolids Regulatory Agencies and Regulations Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/Future
Impact
Impact on City's Wastewater Facilities
Federal EPA  Federal Water Pollution Control Act Amendments of 1972 (CWA).
 CFR Title 40: Chapter I Protection of Environment:
» Subchapter O: Sewage Sludge.
 40 CFR 501, State Sludge Management Program.
 Part 503, Standards for the Use or Disposal of Sewage Sludge:
» Subchapter I: Solid Wastes.
 Part 257, Criteria for Classification of Solid Waste
Disposal Facilities and Practices.
 Part 258, Solid Waste Disposal Facility Criteria:
» Subchapter R: Toxic Substances Control Act.
 Part 761, PCBs Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions.

Current  Establishes general requirements for the National Pollutant Discharge Elimination System Program.
 Establishes standards for biosolids disposal and
end use.
 Biannual Reviews of 40 CFR Part 503:
» Dioxins Risk Assessment.

Current/ Future  May result in biosolids limits for nine pollutants of potential concern.

EPA PFAS Strategic Roadmap Current/Future  Research of PFAS proliferation.  Restriction of PFAS from sources.
 PFAS Risk assessments.

EPA POTW Influent PFAS Study Data Collection Current/Future  Would require the 400 largest WWTPs to fill out a questionnaire about potential industrial sources of
PFAS.
 200 to 300 WWTPs will be selected to sample
influent, effluent, biosolids, and up to 10 industries
for 40 target PFAS and adsorbable organic
fluorine.
 One-time grab samples.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-14
Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/Future
Impact
Impact on City's Wastewater Facilities
State California
SWRCB
General Order (1) Current  Establishes standards for biosolids disposal and end use.
 Water Codes Sections 13267 and 13383 Order for the
Determination of the Presence of PFAS at POTWs
(Order WQ 2020-0015-DWQ).

Current/Future  Currently requires quarterly sampling of WWTP biosolids for PFAS analytes over a one-year
period.
 May result in PFAS limits for biosolids.

CalRecycle  CCR title 27, Division 2.
 Title 22, Division 4.5, Chapter 11: CWEA Manual of Good Practice.

Current  Establishes standards for solid waste disposal in the State of California.

California State
Legislature
 AB 876, Compostable Organics.
 AB 1826, Compostable Organics.
 AB 1594, Waste Management.
 AB 341, Solid Waste Diversion.
 AB 901, Solid Waste Reporting Requirements and
Enforcement.
 SB 1383, Short-Lived Climate Pollutants: Methane
Emissions, Dairy and Livestock, Organic Waste,
Landfills.
 SB 970, Greenhouse Gas Reduction Fund and Grant
Program.
 Healthy Soils Initiative.
 Executive Order N-82-20 (Protects 30 percent of
California's lands and waters by 2030, outlining initial actions to achieve this goal).

Current/Future  Expected to impact the biosolids disposal and end use market. For example:
» Availability of biosolids land application sites.
» Increased competition to convert biosolids to
compost.
» Increased incentive for land application.
 Increased incentive for co-digestion of organic
waste).
 SB 1422, California Safe Drinking Water Act.
 SB 1263, Ocean Protection Council: Statewide
Microplastics Strategy.

Future  May result in required testing of microplastics in biosolids.
 PFAS limits for land applications.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-15
Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/Future
Impact
Impact on City's Wastewater Facilities
Local RWQCB WDRs for the City's Water Reclamation Facility (Order R3-2020-0020)
Current  References federal regulations contained in
40 CFR part 503 that apply to the WWTP's
solids/biosolids.
 References SWRCB Water Quality Order
No. 2004-0015-DWQ which applies to the WWTP's
solids/biosolids.

Notes:

AB - Assembly Bill; CCR - California Code of Regulations; CWEA - California Water Environment Association; PCB - polychlorinated biphenyls; POTW - publicly owned treatment works; SB - Senate Bill
(1) General Order - SWRCB's Order No. 2004-0012-DWQ, General WDRs for the Discharge of Biosolids to Land for Use as a Soil Amendment in Agriculture, Silviculture, Horticulture, and Land Reclamation Activities.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-16

4.3.2 Current Regulations and Practices
The following sections summarize the current federal, state and local regulations that impact treatment and disposal of biosolids generated at Santa Maria WWTP as well as the current practices used.

4.3.2.1 Federal Requirements
40 Code of Federal Regulations Part 503 Regulations
To implement a long-term biosolids program required by the Water Quality Act of 1987, the EPA expanded the WDR programs to include biosolids management. As part of this effort, the EPA initiated two rulemakings resulting in the promulgation of 40 CFR Part 503, Standards for the Use or Disposal of Sewage Sludge. The regulation establishes requirements, procedures, operational standards, and management practices for:
 Biosolids management in WDR permits.
 Implementing federal biosolids permit programs if a state so chooses.  Granting state biosolids management programs primacy over federal programs.  Land application of sewage sludge (which is biosolids in this context) for beneficial use.  Surface disposal in a monofill, surface impoundment, or another dedicated site.  Incineration of sewage sludge with or without auxiliary fuel.

The regulation applies to non-hazardous wastewater solids that are applied to land, fired in a sewage sludge incinerator, or placed on a surface disposal site. Approximately 25 percent of the City's biosolids are disposed of via the City's landfill and the remainder is composted. Some landfills require that biosolids meet some of the classifications established in 40 CFR Part 503 (such as Class B). The regulation establishes biosolids quality standards based on three parameters:
 Pathogen reduction: Pathogen reduction in biosolids is the removal of disease-causing organisms (i.e., harmful bacteria or viruses) through treatment practices.  Vector attraction reduction: Vector attraction reduction is the minimization of transport of pathogens to humans or other animals via vectors such as flies, mosquitos, rodents, or birds.  Pollutant (metals) concentration: Pollutant concentration refers primarily to metal concentration limits that must be met for applying biosolids to land.

Based on these parameters, the EPA classifies biosolids into Class B, Class A, and Exceptional Quality biosolids.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-17
Class B biosolids are treated with processes that significantly reduce, but do not fully eliminate, pathogens. As such, Class B biosolids may be land applied with restrictions. Land appliers must follow Class B biosolids land application and pollutant load requirements for concern of public contact, animal forages, and production of crops for human consumption. For example:
 Class B biosolids may only be applied to sites where there is no possibility of contact with the general public. These sites include areas with specific types of agriculture, land reclamation, landfills, etc.  Crop harvesting, animal grazing, and public access are restricted after biosolids land application for a defined period until environmental conditions have further reduced pathogens.

Class A biosolids are treated with processes designed to reduce pathogens to nearly undetectable levels.

Therefore, they may be beneficially used, such as fertilizer or compost, at public sites, such as in nurseries, gardens, and golf courses. Class A biosolids are treated by processes such as thermophilic anaerobic digestion, heat drying, and pasteurization.

Exceptional quality biosolids are the highest quality treated biosolids. Exceptional quality biosolids must meet or exceed Class A requirements for pathogen and vector attraction reduction as well as meet more stringent metal pollutant concentrations. Exceptional quality biosolids can be distributed in bulk or bag form and are not subject to general requirements and management practices with the exception of monitoring, recordkeeping, and reporting to substantiate the quality criteria have been met. 40 Code of Federal Regulations Part 501 Regulations
40 CFR Part 501, State Sludge Management Program, includes procedures for approving, revising, and withdrawing State sludge management programs. All State sludge management programs are required to include the following components:
 Authority to require compliance by any person who uses/disposes of sewage sludge.  Authority to issue permits to POTWs that apply and ensure compliance with Section 405 of the CWA, as well as procedures for issuing permits.
 Provisions for regulating use/disposal of sludge by non-permittees.  Authority to take action to protect public health and the environment from adverse effects from toxic pollutants in sewage sludge.
 Authority to enforce permits, including issuance of civil or criminal penalties. 40 Code of Federal Regulations Part 258 Regulations
In addition to the regulations set forth to govern sewage sludge use and disposal, 40 CFR Part 258, Solid Waste Disposal Facility Criteria, was promulgated in October 1991 to control the disposal of sewage sludge classified as solid waste. Sewage sludge is exempt from the definition of solid waste unless the sludge is co-disposed of with household solid waste. 40 CFR Part 258 sets forth criteria for landfills with respect to location, design, operation, groundwater monitoring, and closure with the intent of protection of ground and surface water from contamination. The main requirement for landfilling of sludge is that it must meet the Paint Filter Liquids Test (EPA Method 9095A) and the Toxicity Characterization Leaching Procedure (TCLP) test. The paint filter test method determines the presence of free liquids in a sample.

Well dewatered, stabilized wastewater solids and biosolids typically pass this test. The TCLP test determines whether the sewage sludge is hazardous.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-18
40 Code of Federal Regulations Part 257 Regulations
40 CFR Part 257, Criteria for Classification of Solid Waste Disposal Facilities and Practices, includes regulations for biosolids disposal practices not covered under 40 CFR Part 258 or 503. 40 Code of Federal Regulations Part 261 Regulations
Biosolids must be tested at a frequency dependent on the solids loading to determine if they are non-hazardous. Biosolids that are determined to be hazardous—as defined by 40 CFR Part 261, Identification and Listing of Hazardous Waste—must be disposed of in accordance with the Resource Conservation and Recovery Act and are subject to regulation as hazardous wastes under 40 CFR Parts 124, 262-265, 268, 270, and 271.
40 Code of Federal Regulations Part 761 Regulations
40 CFR Part 761, PCBs Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions, establishes prohibitions and requirements for the manufacturing, processing, distribution in commerce, use, disposal, storage, and marking of PCBs and PCB items. This regulation includes specific disposal requirements for sewage sludge containing more than 50 milligrams per kilogram (mg/kg) of PCBs. The presence of PCBs is detected when conducting the regular testing as required by 40 CFR Part 761 to verify that the sewage sludge is non-hazardous.

4.3.2.2 State Regulations
The following sections summarize the primary state regulations that impact treatment and disposal of biosolids.

State Water Resources Control Board General Waste Discharge Requirements for the Discharge of Biosolids - Order No. 2004-0012-DWQ
The treatment and disposal of Santa Maria WWTP biosolids must comply with the SWRCB Order No. 2004-0012-DWQ, General WDRs for the Discharge of Biosolids to Land for Use as a Soil Amendment in Agriculture, Silviculture, Horticulture, and Land Reclamation Activities (2004 General Order). Currently the City does not land apply biosolids, but if this were to change in the future then the City would need to comply. The 2004 General Order applies to Class B land application sites of all sizes and Class A Exceptional Quality sites where biosolids will be applied at rates greater than 10 dry tons per acre per year to a field that is larger than 20 acres in size.

The 2004 General Order goes beyond the requirements of 40 CFR Part 503 by requiring additional biosolids testing, soil testing, and groundwater sampling. For such a discharge to be allowed, the biosolids must meet these treatment and testing requirements, and must demonstrate capability to be beneficially used as a soil amendment as specified under 40 CFR Part 503. The General Order requires the same pathogen reduction and vector attraction reduction requirements as in 40 CFR Part 503. The 2004 General Order is intended to help streamline the regulatory process for discharges but may not be appropriate for all sites using biosolids due to site specific conditions or locations. Such sites are not precluded from being issued individual WDRs.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-19
Per the general order for biosolids SWRCB No. 2004-0012-DWQ, any biosolids product, including the composted product shall be measured regularly. If the biosolids comply with these limits, it may be permitted for land application. The limits for metals are shown in Table 4.7.

Table 4.7 State Permit (2004-0012-DWQ) - Biosolids Limits (Metals) Pollutant Monthly Average Concentration
(mg/kg)
Ceiling Concentration
(mg/kg)
Arsenic 41 75
Cadmium 39 85
Copper 1,500 4,300
Lead 300 840
Mercury 17 57
Molybenum - 75
Nickel 420 420
Selenium 100 100
Zinc 2,800 7,500
The composted biosolids shall also meet the pathogen and vector reduction standards in Table 4.8.

Table 4.8 State Permit (2004-0012-DWQ) - Biosolids Limits (Pathogens) Pollutant Class A Class B
Fecal coliform <1,000 MPN per gram total solids <2 million CFUs or MPN per gram total solids (dry weight)
Salmonella <3 MPN per 4 grams total solids (dry weight) Concentrations reduced by a factor of 10 Enetric viruses <1 PFUs per 4 grams total solids (dry weight) Concentrations reduced by a factor of 10 Viable helminth ova <1 viable ova per 4 grams total solids (dry weight) - Notes:

CFU - colony forming unit; MPN - most probable number; PFU - plaque forming unit To reach these pathogen reduction limits, time and temperature requirements for anaerobic digesters are provided. For Class B biosolids, anaerobic digesters must run with a minimum solids retention time of 15 days at 35 to 55 degrees Celsius (degrees C) - 95 to 131 degrees F; or 60 days at 20 degrees C (68 degrees F). In addition, 38 percent of volatile solids (VS) must be removed during the anaerobic digestion process.

The selected provisions detailed in the list represent a portion of the requirements detailed for land application. More provisions may be found by consulting the 2004-0012-DWQ permit and WQ 2015-0121-DWQ, the statewide composting permit mentioned above.

Biosolids Disposal Regulations
CalRecycle oversees and regulates California's solid waste disposal, including the disposal of biosolids with municipal solid waste and the use of biosolids as ADC material at landfills. Per the existing permits, Santa Maria WWTP is exempt from the requirements of Consolidated Regulations for Treatment, Storage, Processing, or Disposal of Solid Waste in CCR, Title 27, Division 2, Subdivision 1, Section 20005, et seq.

The Title 27 exemption is in effect so long as Santa Maria WWTP meets the preconditions for Sewage, VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-20
Wastewater, Underground Injection, Soil Amendments, and Fully Enclosed Units categories. Biosolids that are land discharged (disposed), including incineration ash, must also comply with the following regulations:
 CCR Title 23, Division 3, Chapter 15.
 Title 22, Division 4.5, Chapter 11; CWEA Manual of Good Practice for Agricultural Land Application of Biosolids.

PFAS Sampling
The state issued Order WQ 2020-0015-DWQ in July 2020, which requires WWTPs across the state to conduct PFAS sampling of their effluent and biosolids. Per this order, WWTPs must conduct a one year-long sampling of 31 PFAS analytes in the influent and effluent. Further, biosolids must be sampled for PFAS and moisture content once during the same year-long sampling period. As of now, Santa Maria has completed a yearlong sampling baseline for PFAS constituents.

Senate Bill 1383
CalRecycle SB 1383, which became effective on January 1, 2022, requires 50 percent diversion of organics (including wastewater solids and biosolids) from landfills by 2020 relative to 2014 levels and 75 percent diversion by 2025. Historically, both use of wastewater solids as ADC in landfills and land application were considered landfill diversion. However, with the enactment of SB 1383, use of wastewater solids as ADC no longer qualifies as diversion and is considered disposal. This could drive wastewater agencies that currently landfill their biosolids to investigate land application options, development of more anaerobic digestion and composting facilities (both in the public and private sector), increased co-digestion of organics at WWTP having excess anaerobic digestion capacity, and an increase in compost and biosolids products in the market. Furthermore, SB 1383 is expected to overturn county ordinances that overly restrict land application and expand the number of land application sites.

The City has responded to SB 1383 by developing an organic waste management program. This program includes an Edible Food Recovery Program which connects local food-generating businesses with local food recovery organizations to distribute leftover edible food to people in need. In addition, businesses and households have ways to dispose of organics though separate organics containers collected by the City and transported to the local composting facility. In 2023 the City recycled over 1.45 million pounds of organics through their Commercial Organics Recycling Program. An example of the City's annual organic waste newsletter is included in Appendix O.

4.3.2.3 Local Regulations
At a local level, counties across California have developed (or are developing/amending) ordinances governing biosolids land application. The stringency of these county regulations ranges from requiring high minimum insurance to banning biosolids land application altogether. Figure 4.1 summarizes the status of county ordinances affecting the use (specifically, land application) of biosolids. Currently, no regulations exist for land application of biosolids in Santa Barbara County. This is only one of two Southern California counties with no regulations. Just to the north, in San Luis Obispo county, and northeast in Kern county, there is a ban on Class B biosolids application. To the east in Ventura county a Conditional Use Permit would be required, and there are currently no counties south of San Francisco that VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-21
accept Class B solids for land application. Given this trend it can be anticipated that in future it will become more difficult to land apply sub-Class B and Class B solids in and around the Santa Maria area.

Figure 4.1 Map of County Ordinances
Further, Santa Barbara County’s 2030 Climate Action Plan (CAP) sets to reduce organic waste by 35 percent by 2030, and 90 percent by 2045. Although the Santa Barbara CAP does not directly apply to the City of Santa Maria, the goals stated under the target have an effect on land use within the county.

The County CAP aims to be complaint with the requirements of SB 1383, described above. These measures incentivize organic waste recycling and promote composting and land application initiatives that can be incorporated by the Santa Maria WWTP.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-22

4.3.2.4 Current Practices
The City currently operates a series of Gravity Thickeners, Anaerobic Digestors, and Sludge Drying Beds to treat solids. Approximately 75 percent of the dried solids are then sent to an offsite composting facility (operated by Engel & Gray, Inc. [Engel & Gray]) and the remainder to the Santa Maria landfill. The City reports on its solids production and disposal in an annual EPA Sludge Report. An example from 2018 is included in Appendix P. The Engel & Gray composting facility is regulated under a separate Statewide General Composting Permit, Order WQ 2015-0121-DWQ, that stipulates Class A, B and/or Exceptional quality biosolids as a Tier II allowable feedstock - see Appendix Q. Also, as noted above, the City transports organic food waste to the composting facility too. Vegetative and non-vegetative food materials are listed as Tier I and Tier II composting feedstocks, respectively.

The City reports the values of the constituents in Table 4.7 on a quarterly basis, along with total nitrogen and moisture content. In addition, the tonnages of biosolids sent to Engel & Gray Composting, Inc. and Santa Maria Regional Landfill are analyzed monthly.

In 2023, the Santa Maria WWTP anaerobic digesters reached an average VS reduction of 58 percent. The average detention time exceeded the regulatory limit of 15 days with average temperatures of about 35 degrees C. This means Santa Maria WWTP complies with time, temperature, and VS reduction requirements for Class B biosolids treated in anaerobic digesters.

4.3.3 Future Biosolids Regulations
Potential future wastewater solids regulations that may impact Santa Maria's biosolids management are discussed in this section.

4.3.3.1 Biannual Reviews of 40 Code of Federal Regulations Part 503 The CWA requires biannual review of 40 CFR Part 503. Since promulgation of the regulation in 1993, there have been no major changes or new pollutants added. However, as part of the 2009 Targeted National Sewage Sludge Survey, the EPA found nine pollutants of potential concern. These nine chemicals are barium, beryllium, manganese, silver, 4-chloroaniline, fluoranthene, pyrene, nitrate, and nitrite. Limits for these compounds could be included in Part 503 in the future. In addition, molybdenum limits could be introduced for exceptional quality biosolids and cumulative pollutant loading rate conditions.

4.3.3.2 United States Environmental Protection Agency Office of Inspector General Review of Biosolids Program
In November of 2018, the EPA's Office of Inspector General released a report based on their audit of the EPA's biosolids program. The goal of this audit was to assess whether the EPA's biosolids land application program adequately protected human health and the environment. The Office of Inspector General made 13 recommendations to improve the EPA's biosolids land application program, eight of which were accepted by the EPA. Of the five contested recommendations, most were not accepted due to language used on the EPA's website regarding the safety of biosolids. The Office of Inspector General found that chemical risk assessments have not been conducted for 352 pollutants detected in biosolids and stated more research is needed to determine the safety of biosolids.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-23

4.3.3.3 United States Environmental Protection Agency PFAS Biosolids Risk Assessment and PFAS Strategic Roadmap
The EPA developed a PFAS Strategic Roadmap to research, restrict, and remediate the extent of PFAS contamination throughout the United States. It directs local, tribal, and state agencies to identify the scale and the sources of PFAS contamination and identify actionable steps to reduce the harm on the environment and on public health. This has resulted in multiple actions: including banning of some PFAS manufacturing, national drinking water standards for six PFAS compounds, and the designation of two PFAS chemicals as Hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act rules. These new rules, passed recently, illustrate the importance of PFAS regulation in the eyes of governing bodies.

In addition, the EPA has provided a finalized laboratory method for quantifying PFAS compounds in biosolids, wastewater, and environmental samples. Methods 1633 and 1621 provide a standardized federal method to track and report PFAS levels. Other analytical methods may be available/required in the future.

The EPA has further directed a Risk Assessment to be conducted for PFOA and PFOS, two significant PFAS compounds, in biosolids. The risk assessment is currently underway and will be published by the end of 2024. The risk assessment will define the scope and scale of PFAS contamination, develop conceptual models for possible exposure routes through land application, surface disposal, and incineration, and develop data-driven tools for analyzing risk in communities. The outcome of this risk assessment will likely lead to regulations aimed to limit human exposure. Overall, PFAS regulations are expected to develop in the short term and may need to be implemented within the planning horizon of this Master Plan.

4.3.3.4 Recently Adopted State Legislation Impacting Biosolids At the federal level, biosolids regulations are well established. In contrast, several recently implemented and anticipated state regulations may impact the future of biosolids land application in California, with some regulatory drivers potentially promoting land application and others potentially limiting land application.

The following recently implemented state-level regulations may promote biosolids land application:
 SB 1383 (2016, effective 2022):
» Is expected to incentivize co-digestion of organics at water resource recovery facilities (wastewater treatment plants) and beneficial use of biosolids and biogas. » Is expected to increase competition for anaerobic digestion and composting capacity. » May overturn overly restrictive county ordinances.
 Several climate initiatives may promote land application for its fertilizer offset and carbon sequestration benefits:
» Healthy Soils Initiative (2016).
» Executive Order N-82-20 (2020).
» AB 284 (2021).
» SB 27 (2021).

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-24

4.3.4 Treatment Implications
From a treatment perspective, the legislative trends described above may have a significant impact on the current biosolids regime. Once the implementation of the laws proceed (in particular SB 1383 that requires 75 percent diversion of organics from landfills by 2025 relative to 2014, and the Santa Barbara County CAP that targets 85 percent reduction of organic waste by 2035), the City may face a situation where the Santa Maria landfill that receives some WWTP biosolids may no longer accept them for disposal. Further, increased demand for organics diversion by other businesses and individuals may cause strain on the capacity of the existing composting facilities in Santa Maria (such as Engel & Gray, the existing composting facility). This may further reduce the ability of Santa Maria to send their biosolids to the local composting operation.

This means that the City should explore different alternatives for the long-term disposal of their WWTP biosolids. This may mean producing a higher grade of biosolids, moving from Class B to Class A for example, and/or participating in a consolidated regional biosolids treatment/disposal system.

Participation in a regional treatment/disposal operation may be particularly relevant given the recent concerns over PFAS and microplastics, where consideration of incineration or other thermal processing that could destroy these compounds may be prudent or required as part of the future regulations. If stringent PFAS limits are implemented on biosolids in the future, processes to treat and destroy PFAS may be required. There are ongoing efforts by other WWTPs on the Central Coast to form a regional biosolids group to keep abreast of regulatory developments and technology advances with sludge drying and thermal processing. The City is participating in these regional discussions and efforts.

Further discussion of biosolids treatment processes and disposal alternatives for different biosolids Classes in presented in Volume 8 - Solids Treatment and Handling.

4.4 Air Quality
Air Quality regulations play an increasingly important role in the regulatory landscape in California, as the state attempts to reach its climate targets. WWTPs contribute significantly to meeting the statewide targets. Air quality and emissions are discussed in more detail in Volume 10 - Air Quality and Emissions.

4.4.1 Regulatory Setting and Overview - Air Quality

4.4.1.1 Federal Regulatory Agencies
At the federal level, the EPA establishes and enforces the federal regulations that govern air emissions generated by the Santa Maria WWTP facilities. These rules and regulations are codified in CFR Title 40:

Protection of the Environment. Most of the regulations impacting WWTP air emissions are based on the Clean Air Act (CAA). The major sections of the CFR that apply to air emissions generated at WWTPs are referenced in this chapter. As was the case for biosolids, the EPA's Pacific Southwest region (Region 9) is responsible for implementing and enforcing these federal regulations in California.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-25

4.4.1.2 State Regulatory Agencies
At the state level, the California Air Resources Board (CARB) develops statewide policy and regulations for the protection of public health from the effects of air pollution and enforces federal regulations to meet minimum air quality standards. Additionally, CARB sets state-level air quality standards, identifies pollutants that pose the greatest health risks, measures progress in reducing air pollutants researches the cause and effect of air pollution problems and potential solutions, studies the cost benefit of pollution controls, and leads California's efforts in reducing climate-changing emissions.

4.4.1.3 Local Regulatory Agencies
At the local level, 35 local air pollution control districts share responsibility with CARB to ensure that federal and state air quality requirements are met. The local air districts regulate emissions from factories, industrial facilities, and other stationary sources, such as combustion engines, boilers, and flares at WWTPs. Additionally, the local air districts provide permitting, air quality attainment planning, rulemaking, air quality monitoring, and incentive programs. The Santa Barbara County Air Pollution Control District (SBCAPCD) has jurisdiction over Santa Barbara County, including the City.

4.4.1.4 Regulatory Overview
Table 4.9 provides an overview of the current and anticipated air regulations, codes, policies, and agreements (requirements) that apply to the air emissions generated from the WWTP facilities. These requirements are described in further detail in the following sections:

1. Criteria Pollutant Regulations.

2. Hazardous Pollutant Regulations.

3. Stationary Emergency Standby Diesel-Fueled Combustion Engine Regulations.

4. Greenhouse Gas (GHG) Emissions.

5. Statewide Carbon Neutrality Requirements.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-26
Table 4.9 Summary of Air Quality Regulatory Agencies and Requirements Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/
Future
Impact
Impact on City's
Wastewater Facilities
Federal EPA  Federal CAA of 1970.
 CFR Title 40: Chapter I Protection of
Environment.
 Subchapter C: Air Programs:
» 40 CFR Part 50, National Primary and
Secondary Ambient Air Quality Standards.
» 40 CFR Part 51, Requirements for
Preparation, Adoption, and Submittal of
Implementation Plans.
» 40 CFR Part 52.21, Prevention of Significant
Deterioration of Air Quality.
» 40 CFR Part 53, Ambient Air Monitoring
Reference and Equivalent Methods.
» 40 CFR Part 58, Ambient Air Quality
Surveillance.
» 40 CFR Part 60, Standards of Performance
for New Stationary Sources.
» 40 CFR Part 61, National Emission
Standards for Hazardous Air Pollutants.
» 40 CFR Part 63, NESHAP for Source
Categories.
» 40 CFR Part 70, State Operating Permit
Programs.
» 40 CFR Part 98, Mandatory Greenhouse
Gas Reporting.
 NESHAP for POTW.

Current  Establishes standards
for implementation
plans to meet air quality
requirements.
 Establishes standards
for criteria and
hazardous air
pollutants.
 Establishes
requirements for GHG
emissions reporting and
reduction.
 Establishes standards
for primary hazardous
air pollutants.

State CARB  CAAQS. Current  Establishes standards
for criteria air pollutants.

California
State
Legislature
 AB 1807, Toxics Air Contaminant Identification
and Control (1983).
 AB 2588, Air Toxics "Hot Spots" Information and
Assessment Act (1988).
 SB 1731, Risk Reduction Audits and Plans (an
amendment to the "Hot Spots" Act) (1992).
 AB 617, Non-Vehicular Air Pollution: Criteria Air
Pollutants and Toxic Air Contaminants (2017).

Current/
Future
 Establishes standards
for hazardous air
pollutants.
 As part of
implementation, CARB
may establish new
emissions monitoring
and more restrictive
limits for TACs.
 AB 32, California Global Warming Solutions Act
of 2006.
 SB 32, California Global Warming Solutions Act
of 2006, Emissions Limit.
 Executive Order B-55-18 to Achieve Carbon
Neutrality.

Current  Establishes
requirements for GHG
emissions reporting and
reduction.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-27
Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/
Future
Impact
Impact on City's
Wastewater Facilities
Local SBCAPCD  SBCAPCD Rules and Regulations:
» Regulation II, Permits - Operating and
Construction, New Source Review.
» Regulation IV, Prohibitions - General and
Source Specific Regulations.
 PTO No. 08390-R11 (for Santa Maria WWTP).

Current  Establishes standards
for air pollutant
emissions for Santa
Barbara County, that
the City's wastewater
facilities must comply
with.
 Establishes specific air
pollution emission
requirements for
equipment at the
WWTP.
 Santa Barbara CAP. Current/
Future
 Improve building
efficiencies and expand
usage of renewable
energy sources.

Notes:

CAAQS - California Ambient Air Quality Standards; NESHAP - National Emission Standards for Hazardous Air Pollutants; TAC - toxic air contaminant

4.4.2 Current Criteria Pollutant Regulations

4.4.2.1 Federal
The Federal CAA was put into law in 1970 to regulate and improve air quality in the United States. The CAA creates a comprehensive national framework designed to protect ambient air quality by limiting air emissions for both stationary and mobile sources. The CAA primarily regulates six common air pollutants which are referred to as "criteria air pollutants." Per the CAA, the EPA establishes National Ambient Air Quality Standards (NAAQS) for the six criteria pollutants to protect human health and welfare. These standards are codified in 40 CFR Part 50, National Primary and Secondary Ambient Air Quality Standards.

The six criteria pollutants are:
 Ozone.
 Particulate matter (PM) (PM10 and PM2.5).
 Lead.
 Carbon monoxide (CO).
 Sulfur oxides (SOx).
 Nitrogen oxides (NOx).

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-28

4.4.2.2 State
The EPA requires states to adopt and enforce plans to achieve the NAAQS. As such, CARB has set CAAQS to enforce the NAAQS for the six criteria pollutants as well as four additional pollutants. The four additional pollutants include:
 Hydrogen sulfide (H2S).
 Sulfate.
 Vinyl chloride.
 Visibility-reducing particles (i.e., particles that reduce visibility for airport safety, scenic enjoyment, road safety, etc.).

4.4.2.3 Local
Air regulations are implemented locally by the SBCAPCD, which ensures compliance to safeguard air quality in the region.

There are two primary types of permits applicable to WWTPs: the Permit to Operate (PTO) and the Authority to Construct (ATC). The PTO authorizes the operation of equipment that emits pollutants and requires renewal every three years. For instance, the PTO for the City's WWTP, identified as PTO No. 08390-R11, is reevaluated triennially, with the most recent review conducted in September 2024.

The ATC permits the construction of new equipment or the modification of existing equipment that will emit pollutants and is renewed as needed based on the project's timeline.

The PTO comes with stringent requirements to ensure ongoing compliance with emission standards. This includes specific limits on pollutants such as NOx, CO, SOx, PM10, and PM2.5. There are also operational restrictions, including the volume of digester gas and propane that can be burned daily. The permit mandates proper maintenance and operation of equipment, and strictly prohibits the venting of digester gas except under breakdown conditions.

Monitoring and recordkeeping are essential components of compliance. Daily monitoring of digester gas and propane volumes combusted must be conducted using calibrated flow meters. Detailed records must be maintained, including daily volumes of fuel used, maintenance logs, and instances of leaks or H2S alarms. Additionally, annual reports documenting compliance with permit conditions must be submitted by March 1 of each year. These reports include data on emission levels, fuel usage, and any corrective actions taken. Compliance and enforcement mechanisms are in place to ensure adherence to the permit conditions. This includes the implementation of an SBC APCD-approved Inspection and Maintenance Plan, which details procedures for detecting and repairing leaks, maintaining equipment, and ensuring compliance with emission thresholds. Biennial source testing of emissions and process parameters is also required to verify compliance with emission standards.

4.4.3 Current Hazardous Pollutant Regulations

4.4.3.1 Federal
In addition to criteria air pollutants, the CAA requires the EPA to regulate emissions of 188 toxic materials defined as "hazardous air pollutants." Hazardous air pollutants are those suspected to cause serious health effects (such as cancer or birth defects) or adversely impact the environment. Hazardous air VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-29
pollutants are also referred to as "toxic air contaminants," TACs, or "air toxics." The EPA regulates emissions from air toxics by developing rules targeting specific industrial "source categories" under the NESHAP program. This program is codified under:
 40 CFR Part 61, NESHAP.
 40 CFR Part 63, NESHAP for Source Categories.

4.4.3.2 State
To reduce the emission of air toxics from stationary and mobile sources, CARB initiated the California Air Toxics Program in 1983 with the passage of AB 1807, TAC Identification and Control. Through the program, CARB has identified 200 toxic air pollutants and implemented 26 control measures for airborne toxics. The California Air Toxics Program was further developed with the passage of AB 2588 in 1987 and SB 1731 in 1992. The goals of AB 2588 include:
 Collecting toxic air emissions data.
 Identifying facilities with localized emission impacts.  Determining adverse health risks per methods developed by the California OEHHA.  Notifying impacted communities of significant risks.
 Reducing significant risks to acceptable levels.

In March 2015, OEHHA updated its health risk assessment procedure to better characterize exposure risks to children. Using the new procedures, the estimated risks increased up to six times those estimated with the former procedure, even when assuming no changes in air toxics exposure.

In 2017, AB 617, Non-Vehicular Air Pollution: Criteria Air Pollutants and TACs, was signed into law. The law established the Community Air Protection Program with the primary goal of reducing air pollution exposure in communities that experience high cumulative exposure to air pollutants, including air toxics.

In 2020, AB 617 was amended to update annual reporting of criteria air pollutant and TAC emissions data from facilities. In addition, the update established policies to improve emissions inventory data for better understanding of pollution sources and impacts. At the same time as the AB 617 updates, the AB 2588 "hot spots" program, which established a statewide program for inventorying air toxic emissions data from individual facilities, as well as requirements for risk assessments and public notification for those risks, was updated. As part of improving air toxic emissions reporting, the public's access to the data, and reduction strategies for priority communities, the updates to the CARB Emission Inventory Criteria and Guidelines and the Regulation for the Reporting of Criteria Air Pollutants and Toxic Air Contaminants (CTR) included:
 Expansion of the number of compounds to be validated for monitoring and reporting from a total of approximately 500 to over 1,700 for permitted waste facilities, including WWTPs.  Establishment of criteria for air monitoring and an approach for the waste sector (i.e., the "two-step" process) to identify a short list of toxics relevant to WWTPs.  Identification of strategies/timelines for emissions reductions (prioritizing overburdened communities).

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-30
Since most of the 1,700+ compounds do not have approved sampling or laboratory methods and have not been assessed by the OEHHA, health risks associated with these compounds cannot be quantified.

Thus, since the potential impacts are difficult to assess, they will not be included in this planning process.

4.4.4 Current Climate Change Regulations

4.4.4.1 Federal
The EPA's Mandatory GHG Reporting Rule (40 CFR Part 98) was adopted on October 30, 2009. The Reporting Rule explicitly states that centralized domestic wastewater treatment systems are not required to report emissions. However, any stationary combustion of fossil fuels taking place at a wastewater treatment facility may be considered a "large" source of GHGs if they emit a total of 25,000 metric tons (mt) or more of carbon dioxide equivalent (CO2e) emissions per year. Therefore, it is prudent for wastewater agencies to estimate their emissions relative to the reporting threshold.

4.4.4.2 State
Assembly Bill 32, Senate Bill 32, and Executive Order B-55-18 In September 2006, AB 32 Global Warming Solutions Act of 2006 was signed into law. AB 32 required CARB to act as the lead agency for implementing regulations requiring public and private agencies to reduce GHG emissions to 1990 levels by 2020. California met the AB 32 target of reducing GHG emissions to 1990 levels ahead of the goal.

Building on this success, SB 32 California Global Warming Solutions Act of 2006 was adopted in 2016 requiring the state to implement a target of reducing emissions by 40 percent below 1990 levels by 2030.

The intent of SB 32 was to set the state on track for achieving a reduction goal of 80 percent below 1990 levels by 2050. In addition to this, Governor Brown, at the time, issued Executive Order B-55-18 in 2018 to establish statewide carbon neutrality by 2045.

The GHGs regulated under both AB 32 and SB 32 that are most relevant to WWTPs are:
 Carbon dioxide (CO2).
 Methane (CH4).
 Nitrous oxide (N2O).

The legislation does not target wastewater treatment process emissions specifically, but it does cover electricity generating units and on-site general stationary combustion sources (e.g., engines, boilers, and flares). The City's WWTP currently operates flares and boilers.

Pursuant to AB 32, GHG estimates are based on CARB's Regulation for the Mandatory Reporting of GHG Emissions (Title 17, CCR, Sections 95100-95157). To align itself with the EPA's GHG Reporting Rule, CARB's regulation incorporated references from certain requirements of the EPA's Final Rule on Mandatory Reporting of GHGs (Title 40, CFR, Part 98). Specifically, Section 95100(c) of CARB's regulation incorporated those requirements promulgated by EPA as published in the Federal Register.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-31
CARB lists two thresholds that indicate whether WWTPs must report their GHG emissions. The reporting thresholds shown in Table 4.10 include emissions from both fossil fuel (i.e., natural gas and diesel) and non-fossil fuel or biogenic (e.g., biogas) sources. Note, the thresholds do not include emissions from emergency standby diesel engines.

Table 4.10 GHG Emissions Threshold for Reporting Years 2011 and Beyond Equipment Threshold
Electricity Generating Unit ≥10,000 mt CO2e per year
General Stationary Combustion ≥10,000 mt CO2e per year
The City's WWTP currently produces less than 10,000 mt CO2e per year and is, thus, not required to report.

Greenhouse Gas Cap-and-Trade Program
In addition to mandatory reporting of GHGs, CARB adopted a GHG cap-and-trade program that became effective in January 2012. This program states that agencies emitting 25,000 mt or more of fossil fuel-based (i.e., natural gas and diesel) CO2e emissions per year beginning in 2011 or any subsequent year will be capped and required to pay for allowances and eventually reduce their emissions over time. The City's WWTP does not exceed the GHG reporting threshold; therefore, the cap-and-trade threshold does not currently apply.

Statewide Carbon Neutrality Requirements
In 2021, at the Governor of California's request and in time for the next climate change scoping plan update, CARB began evaluating pathways for the state to achieve carbon neutrality by 2035, in advance of the 2045 target. This included strategies to reduce fossil fuel demand and supply and transition to 100 percent clean and renewable resources for all electricity retail.

4.4.4.3 Local
Under the published draft of the Santa Maria General Plan Update for 2045, there is language that seeks to align City of Santa Maria policy with statewide GHG reduction targets. There are no additional GHG ordinances from the local level.

4.4.5 Current Practices

4.4.5.1 Criteria Pollutants
The City operates anaerobic digesters to treat its biosolids. CH4 and CO2 are generated during the digestion process. The City primarily burns the biogas using a boiler (Boiler 1), or in one of two waste flares. The waste flares burn excess biogas not required by the boiler. Each flare is equipped with a pilot flare; and each are fueled by propane gas as a back-up. A second boiler has been exempt from the regulations. An iron sponge scrubber serves as a standby H2S treatment system. The iron sponge scrubber is not operated under standard conditions.

The local regulations, enforced by the SBCAPCD, take into account the state and federal rules on criteria and hazardous pollutants. The existing permit to operate the flares, digesters, and boilers onsite is VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-32
PTO No. 08390-R11. The permit regulates the amount of criteria pollutants and the quantity of fuel that may be burned.

Table 4.11 lists the permit potential to emit for recognized air quality pollutants under PTO No. 08390-R11.

Table 4.11 Santa Maria Permit Potential to Emit Limits - Tons Per Year Equipment NOx ROC CO SOx PM PM10 PM2.5 Maximum Fuel Input (mmBTU/hour)
Flare 1 1.38 1.75 7.5 4.55 0.41 0.41 0.41 4.63
Flare 2 3.56 4.52 19.37 11.74 1.05 1.05 1.05 12.0
Flare 1 (pilot) 0.03 0.04 0.15 0.05 0.01 0.01 0.01 0.095 Flare 2 (pilot) 0.03 0.04 0.15 0.05 0.01 0.01 0.01 0.095 Boiler (digester gas) 0.4 0.06 3.26 2.46 0.08 0.08 0.08 2.51 Boiler (propane) 0.4 0.06 3.26 0.18 0.08 0.08 0.08 Exempt Iron Sponge Scrubber - 0.01 - - - - - -
Total 4.02 4.66 22.94 14.30 1.15 1.15 1.15 N/A
Notes:
mmBTU - million British Thermal Units
In addition to the limits, H2S is monitored once daily using an ambient monitoring system. The current limit for H2S at atmospheric conditions is 796 parts per million as volume (ppmv). The typical daily average concentration of H2S in the treated biogas in 2023 is 197 ppmv. H2S concentrations are reduced due to the injection of ferrous chloride into the digesters. In the case of failure or downtime of the ferrous chloride injection system, the iron sponge scrubber is brought online to keep H2S concentrations below permitted limits.

In addition to the maximum fuel input shown, there are maximum volume limits for monthly digester gas production and for propane gas for boilers and flares.

The permit stipulates the maximum biogas flow to each of the flares and Boiler No. 1. See Table 4.12 for details. The total average biogas production in 2023 was 161,335 standard cubic feet (scf) per day. Typical biogas usage in Boiler No. 1 in 2023 was 35,400 scf per day. The combined energy that the flares can burn each day is 291.5 mmBTU/day.

Table 4.12 Flares and Boiler No. 1 Permitted Flows
Equipment SCF per Day SCF per Minute
Flare 1 185,200 128.6
Flare 2 293,000 203.5
Flare 1+2 Pilots (propane) 1800 1.25
Boiler 1 Maximum Flow (digester gas) 100,000 69.4
Boiler 1 Maximum Flow (propane) 24,000 16.6
Stringent monitoring is required for the system; annual reports are due to the SBCAPCD with information regarding waste gas production, flaring, and H2S concentrations.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-33

4.4.5.2 Greenhouse Gas Emissions
As discussed above, under California AB 32, an emission threshold of 10,000 mt of CO2-equivalents per year is in place. As a stationary source, the Santa Maria WWTP currently does not exceed that threshold and does not produce inventories for the state.

4.4.6 Future Air Quality Regulations
In the future it is expected that there will be more restrictive limits for TACs, NOx, CO2, fluorinated gases, and CH4. This may limit future on-site biogas management options (e.g., cogeneration). Increasing biogas production (such as through increased co-digestion) may trigger new source review and potential limits on production to limit criteria and TAC emissions, including odors. Because N2O is about 300 times more potent than CO2 as a greenhouse gas and is released by activated sludge treatment, there may be future regulations associated with off-gassing from this treatment technology. However, for the current planning horizon it is not anticipated that such regulations would be implemented.

This Master Plan assumes increasingly stringent emissions requirements and the need for emissions control equipment for stationary combustion units and other applicable process units, as thresholds are met.

4.4.7 Treatment Implications
As discussed in the previous sections, there is an ongoing push to reduce GHG emissions and improve air quality in the state of California. With regards to future treatment trains, there are multiple avenues to consider.

The emphasis by Santa Barbara County and SB 1383 to reduce landfill diversion will likely result in a treatment train that keeps anaerobic digestion. In this case, this would mean that biogas flaring and utilization of biogas as a boiler fuel would continue, and the beneficial use of biogas to generate renewable energy could be considered. As such, the criteria pollutants regulated under the existing permit would remain in effect. Currently, the City complies with the permit, and can expect to do so with standard maintenance and monitoring of its existing gas flaring system. The potential for stricter criteria pollutant laws may result in more scrubbers or the inclusion of more efficient flares and boilers.

Upgrading equipment also means that potentially stricter GHG emission limits may be reached in the future.

However, if anaerobic digestion is not incorporated as part of the future treatment train, then biogas will not be produced and beneficial use of the gas and flaring will not be implemented. Accordingly, the compliance burden of current and future air quality regulations will be reduced with respect to biogas, but may be increased depending on the method used to condition the plant biosolids prior to trucking and disposal.

Other design considerations include providing best management practices for the reduction of N2O and other non-regulated process emissions will be incorporated during the preliminary and final design of the selected treatment technologies.

In order to align the WWTP with state targets for decarbonization and clean energy, the City is currently constructing a solar power installation on the east side of Black Road as part of the WWTP upgrades.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-34

4.5 Water Reuse
Water reuse is being broadly implemented in California and other states as a strategy to utilize wastewater plant effluent for beneficial use. The potential regulatory requirements are key to consider during the planning horizon. This section presents an overview of the regulatory setting and current reuse regulations. A more detailed evaluation is presented in Volume 7 - Water Reuse and Disposal.

4.5.1 Regulatory Setting and Overview - Water Reuse
Table 4.13 summarizes the current regulations for water reuse.

Table 4.13 Summary of Water Reuse Regulatory Agencies, Legislation, and Requirements Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or
Agreement)
Current/Future
Impact
Impact on City's Wastewater
Facilities
Federal EPA  Safe Drinking Water Act
 CWA (1970)
 2012 Guidelines for Water Reuse
 Water Reuse Action Plan
Current/
Future
 Provides guidelines and
frameworks for reuse
networks on a
state-by-state basis.
 No actual regulatory
framework for reuse.

State DDW and
SWRCB
 California Code of Regulations, CCR
Title 22
 California DPR Regulations (2023)
 CCR Title 24
 California Water Code
 California Safe Drinking Water Act
Current  Establishes a framework
and standards for
multiple varieties of
recycled water.
 Sets quality benchmarks
and technologically
based targets for water
reuse.

California
State
Legislature
 AB 574, Potable Reuse (2017)
 SB 322, Amendment to SB 918- Water
Recycling (2013)
 SB 918, Water Recycling (2010)
Current/
Future
 Requires the State to
adopt and develop
uniform IPR and DPR
criteria.
 Develop technical and
science-based
recommendation for
potable reuse
implementation.

Notes:

DDW - Division of Drinking Water; DPR - direct potable reuse

4.5.2 Current Water Reuse Regulations

4.5.2.1 Federal
There are currently no federal standards regarding water reuse and water reclamation. The responsibility for regulation of water reuse has been delegated to individual states. Multiple states have begun to incorporate guidelines for water reuse.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-35

4.5.2.2 State
California has become one of the leaders of water reuse regulation. The SWRCB adopted multiple standards for water recycling under Title 22 and Title 27 in the CCR. These clauses are regulated by the SWRCB.

Title 22 - Recycled Water Standards
California state regulations have been some of the primary drivers in the water reuse domain nationwide.

The RWQCB provides permitting and implementation of statewide regulations.

There are different classes of recycled water that could be utilized in Santa Maria. For example, recycled water uses under Title 22 for non-potable reuse include:

1. Undisinfected Secondary:
a. Recycled water that has been oxidized but not disinfected:
i. Used in some agricultural irrigation where recycled water does not contact edible portions of the crops.

2. Disinfected Secondary-23:
a. Recycled water that has been oxidized and disinfected to achieve a median concentration of total coliform bacteria of less than 23 MPN per 100 milliliter (mL) utilizing the bacteriological results of the last seven days for which analyses have been completed, and the number of total coliform bacteria does not exceed an MPN of 240 per 100 mL in more than one sample in any 30-day period:
i. Used in agricultural and urban irrigation where recycled water does not contact edible portions.

3. Disinfected Secondary-2.2:
a. Recycled water that has been oxidized and disinfected to achieve a median concentration of total coliform bacteria of less than 2.2 MPN per 100 mL utilizing the bacteriological results of the last seven days for which analyses have been completed, and the number of total coliform bacteria does not exceed an MPN of 23 per 100 mL in more than one sample in any 30-day period:
i. Used in agricultural and urban irrigation where recycled water does not contact edible portions.

4. Disinfected Tertiary:
a. Recycled water that has been oxidized, filtered, and disinfected. The filtration and disinfection processes need to meet certain criteria, and the median concentration of total coliform bacteria measured in the disinfected effluent must not exceed an MPN of 2.2 per 100 mL utilizing the bacteriological results of the last seven days for which analyses have been completed and the number of total coliform bacteria does not exceed an MPN of 23 per 100 mL in more than one sample in any 30-day period. No sample shall exceed an MPN of 240 total coliform bacteria per 100 milliliters:
i. Can generally be used for the widest variety of applications, including landscape irrigation of publicly accessible areas, food crops, non-restricted recreational impoundments, dual VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-36
plumbed facilities, and various industrial and commercial processes where the water may come in contact with workers.

Beyond the non-potable uses are the potable uses, which include both IPR and direct potable reuse (DPR).

Standards for IPR, groundwater recharge to a potable water aquifer via surface spreading or injection, require at least tertiary treatment and disinfection (for surface spreading) and advanced treatment for groundwater injection. The standards for DPR are significantly greater. Potable reuse regulations establish extensive monitoring, treatment, and performance requirements. Table 4.14 notes examples of treatment standards for groundwater recharge (IPR).

Table 4.14 Title 22 Groundwater Recharge via Subsurface Injection Requirements for Potable Reuse Parameter Criteria
Enteric Virus 12-log Reduction(1)
Giardia Cyst 10-log Reduction(1)
Cryptosporidium oocysts 10-log Reduction(1)
TOC Maximum 0.25 mg/L in 95 percent of samples within first 20 weeks Maximum 0.5 mg/L in 20-week running average
Full Advanced Treatment RO and an advanced oxidation process that achieves 0.5 log reduction of 1,4-dioxane
Total Nitrogen 10 mg/L as N
Inorganic Chemicals in Table 64431-A(1) ≤MCLs
Radionuclide Chemicals in Tables 64442 and 64443 ≤MCLs
Organic Chemicals in 64444-A ≤MCLs
Disinfection Byproducts in Table 64533-A ≤MCLs
Lead and Copper ≤Action Levels
Constituents with NLs ≤NLs (2)
CEC Refer to Recycled Water Policy(3)
DDW-Specified Chemicals Case-by-Case Basis
Minimum Subsurface Relative Retention Time 2 Months
Notes:

RO - reverse osmosis
(1) Log reductions are from the point of raw wastewater to the point of finished water for public consumption. (2) Notable among which is the NDMA goal of 10 nanograms per liter or less. (3) Monitoring requirements for CECs are updated every five years following review by a science advisory panel. Requirements are published within an updated Recycled Water Policy.

The State has also established requirements for other types of potable reuse. These will be discussed in more detail in later sections of this master plan, specifically Volume 7- Reuse and Reclamation, where options for reuse will be considered.

Under Title 27 of the CCR, the combined code of regulations contains references to wastewater discharge in percolation ponds. The exemptions that permit the WWTPs to operate their percolation ponds are:
 If the applicable RWQCB has issued a WDR for the site.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-37
 If the discharge is in compliance with the applicable water quality control plan.  If the wastewater is not a hazardous waste as defined by clauses in Title 22, Chapter 11, Division 4.5 of the CCR.

Legislative Trends
Concerns about groundwater and surface water supplies persist in Santa Maria, and the Central Coast. The agricultural economy, the Mediterranean climate, and changing water supply conditions as part of a changing climate all suggest that recycling water may be an effective tool to reduce water demand in the City.

There are a number of state legislative and county-wide initiatives to reduce water consumption:
 Santa Barbara CAP Measure - Reduce per capita potable water consumption by 1.05 percent by 2030 and 1.58 percent by 2035.
 State SB 1157 - Reduce indoor residential water use to 42 gallons per capita per day.  California Sustainable Groundwater Management Act - Protect groundwater resources and reduce overdraft.
 Executive Water Supply Strategy - 1.8 million acre-feet of recycled water to be produced by 2040.

The existing legislative initiatives shown above indicate that recycled water and water reduction is a core component of California water policy.

4.5.3 Current Practices
Currently, Santa Maria treats the wastewater to Title 22 "Undisinfected secondary" treatment standards.

All water entering the WWTP is treated and then disposed of to the percolation ponds. No recycling is performed.

4.5.4 Treatment Implications
The regulations and legislation discussed above indicate that water reuse will continue to be important in the state. Due to the groundwater basin adjudication, it is unclear if there is a benefit for the City to pursue water reuse. As for now, the current percolation pond operation is acceptable and continued percolation should be incorporated into future planning.

However, in case of stricter mandates in the future, it is important to consider space and flexibility for tertiary water treatment trains such as filtration or disinfection in the planning process.

The opportunities for consideration of reuse may include:
 Identification of non-restricted crops that can be irrigated with current water quality (undisinfected, secondary).
 A disinfection/filtration tertiary process to expand irrigation beneficial uses for agricultural and/or urban customers.
 Alternative uses if some level of TDS removal via advanced treatment, such as reverse osmosis, becomes necessary in the future.

As noted, recycled water opportunities are further investigated in Volumes 7 and 13 of this Master Plan.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-38

4.6 Key Takeaways
The updated General WDR permit issued in June 2023 has prompted the City to improve their treatment operations to attain stricter water quality standards. The planned improvements will not only need to comply with the updated permit, but also consider a shifting regulatory landscape in the state of California.

In addition, changing biosolids, air quality, and water reuse regulations play an important role regarding what should be included in future plant expansions.

Table 4.15 summarizes the category of concern and the potential implications for future treatment at the WWTP facility.

Table 4.15 Summary of Regulatory Requirements
Category Treatment Implications
Water Quality  More stringent limits for effluent constituents such as TDS, Nitrogen, TSS, and BOD will require changes to treatment.
 Nitrogen removal technologies such as Activated Sludge in its various configurations should be considered.
 Stringent monitoring will be needed for future and current constituents at the effluent discharge point.

Biosolids  Digestion or other ancillary treatment technologies that treat to higher quality levels should be considered.
 Alternatives for existing landfill diversion should be considered.  PFAS monitoring is already required, and microplastics monitoring may be required in the future, along with possible regulations for both.
 Participation in regional efforts for thermal processing of biosolids would be beneficial to provide flexibility to position for possible future regional treatment systems required for addressing PFAS or other disposal factors.

Air Quality  Consider phasing-out/replacement of the existing gas flaring system and potential offsets for pollutants or the addition of additional gas treatment systems.  Beneficial use of excess biogas.
 Renewable energy power sources should be considered.

Water Reuse  Include space for tertiary disinfection/filtration treatment trains for improved quality to percolation ponds and for potential future reuse.
 Include space for advanced treatment trains for disposal to groundwater with IPR standards if required in future for TDS reduction.
 Continue use of percolation ponds for as long as possible.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-1
CHAPTER 5 POPULATION, LOADING, AND FLOW

REQUIREMENTS

5.1 Purpose
The purpose of this chapter is to present population projections and to use these projections to develop projected influent wastewater flow quantities and characteristics through the year 2060 for the WWTP.

This chapter assesses historical loading/flows, peaking factors, and wastewater characteristics. The flow quantities and characteristics projections are used as a basis for the design criteria in this update of the Master Plan.

5.2 Background
The City Service area is about 20 square miles. Within this area the sewer collection system conveys wastewater from the east almost entirely by gravity to the west, where the WWTP is located. There is one small lift station located in the southern area of the service area. The existing conveyance and sewer connection lines are depicted in Figure 5.1. Note that the location of the WWTP in the figure terminates on the western side of the service area, where the two 30-inch lines converge at the entrance to the WWTP on Black Road. Also note that the three large (>18 inch) trunk mains are located on county land outside the City's service area.

Source: City of Santa Maria Department of Utilities.

Figure 5.1 Existing Sewer Lines in the City of Santa Maria VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-2
The City has existing agreements with a neighboring county collection and treatment system, LCSD. In this partnership, the City receives about 0.2 mgd of net flow from LCSD (Santa Maria sends a small volume but receives 0.2 mgd more than what it receives). This agreement has a termination date of 2057. More details are included in Volume 2, Chapter 3.

The Santa Maria WWTP, has a septage receiving station. Permitted septic and septage haulers can discharge during operating hours and are charged a per gallon fee for each discharge. Existing permitted septage haulers service customers and areas within Santa Barbara and San Luis Obispo Counties. The City of Santa Maria WWTP is one of the only septage receiving stations within the two counties. The current volume of septage received is around 20,000 gpd on average, but can reach peaks of 35,000 gpd.

A major effort in the planning and development of facility expansions is the estimation of flow and loading projections. The City has furnished data and information relating to existing flows, land use, and population. Population projections will consider the existing service area and future development alternatives to determine per capita and base flow data.

5.2.1 Master Plan Basis
To set the basis for the treatment plant capacity, loading projections for BOD5, TSS, and ammonia nitrogen (NH3-N) were considered, in addition to flow for multiple scenarios that assess the effects of reduced flow patterns. The flow projections were developed based on population growth and existing per capita loading rates for each constituent.

5.2.2 Assumptions
For the purposes of this update to the Master Plan, the following assumptions were made to account for unknown information:

1. The historical and projected population of the Santa Maria community were assumed to be equivalent to the estimates found in the 2020 General Plan Update and the Santa Barbara County Association of Governments (SBCAG) 2050 Regional Growth forecast. Individual annual projections were developed using 10-year percentage growth rates from 2010 to 2060.

2. The agreement with LCSD will remain in effect, and the net flow projections to Santa Maria would scale at the same population growth rates as those developed for the remainder of the Santa Maria service area.

3. Septage receiving will increase by 100 gallons a day per year. In other words, every year, the total amount of septage received will be 100 gallons a day larger than the previous year.

4. Where BOD5 data is lacking and CBOD data is available, BOD5 was calculated based on historical CBOD to BOD5 ratios. Supplementing missing CBOD data through the use of a COD/BOD5 ratio is the only application of this ratio in this update to the Master Plan. The ratio utilized was 0.85.

5. Flow and loading projections were based on the 2018 through 2020 average loading per capita.

5.3 Population
This section summarizes the City's historic and projected collection system service area population.

Additionally, as mentioned, the City provides sewer services to the LCSD. The population projections in this section include areas within the City limits only.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-3

5.3.1 Historic Population
Historic population estimates for the City service area (and the area served to the LCSD plant) were developed based on the Santa Maria General Plan Update and the SBCAG Regional Growth forecast, which drew data from United States Census data, California population and land surveys, and Santa Barbara County data. The population estimates summarized in Table 5.1 were developed using 2000 to 2020 data as a basis. As shown in Table 5.1 the estimated total City population for the year 2020 was 107,407.

5.3.2 Projected Population
Also shown in Table 5.1 is the projected and historical population for Santa Maria.

The Santa Maria General Plan Update and the SBCAG forecast developed population, jobs, and housing projections until 2050. These values were used to project the population out to 2060, and provide an intermediate value for 2040. It is important to note that this projection accounts for reduced growth rates over time, meaning the population will grow more quickly initially before tapering off in later years. A population deviation of 10 percent is included to account for any potential changes in real-world conditions.

Table 5.1 Historical and Projected Population Growth
Year 2010(1) 2020(1) 2030(1) 2040(2) 2050(1) 2060(2)
Population 99,553 107,407 127,600 ± 12,000 135,350 ± 13,600 143,100 ± 14,500 152,200 ± 15,200 Notes:
(1) Sourced from Santa Maria General Plan Update (2020). (2) Estimated based on the Santa Maria General Plan Update (2020).

Figure 5.2 shows the envelope within which the Santa Maria population is expected to fall between 2020 and 2060.

Figure 5.2 Expected Population Growth to 2060
VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-4

5.4 Service Area Land Use
The City provides wastewater collection service to residents, businesses, and other institutions within its service area. Table 5.2 provides the current acreage totals by land use classification within the City limits.

This table is based on data from the 2020 General Plan Update. The City currently provides sewer service to the majority of the existing acreage within the City limits.

Table 5.2 2020 Santa Maria Land Use
Land Use Type Existing Acreage(2) Percentage of City Total Residential 3,486 27.3
Commercial 948 7.4
Industrial 1,082 8.5
Airport 1,411 11.1
Public/Institutional 1,408 11
Conservation and Agricultural 1,828 14.3
Other(1) 2,589 20.3
Total 12,752 100
Notes:
(1) Other indicates vacant or private right-of-way land. (2) Source is from the 2020 General Plan Update.

The largest land-use category is residential, occupying the most significant portion of the city land use.

However, the remainder of land-uses are evenly distributed. As discussed elsewhere in these chapters, Santa Maria is a significant agricultural community, and thus the wastewater flows associated with agricultural growth, or conversion of agricultural land to residential, should be considered.

Future alternatives discussed in the 2022 General Plan Update Technical Memorandum indicated increases in agricultural and commercial land. Volume 2, Chapter 3 provides a more extensive look at land use.

5.5 Wastewater Flows
This section summarizes the existing and projected wastewater flows for the City wastewater collection system. Historical wastewater flows, as well as data obtained as part of recent sampling programs, are presented. Finally, future wastewater flow projections are presented.

5.5.1 Wastewater Flow Components
Table 5.3 presents definitions of commonly used terminology in the wastewater collection system analysis and evaluations conducted as part of this project. Wastewater flows vary according to the season.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-5
Table 5.3 Wastewater Collection System Commonly Used Terminology Term Definition Purpose
BWF The average base wastewater flow occurring during the dry season, between the months of May and October.

Used for permitting and to understand base
flows into the system without addition from wet
weather patterns.

AAF The average flow that occurs on a daily basis averaged for one year, including periods of dry and wet weather
conditions.

Sizing of unit processes or for performing
economic analysis of alternatives.

PDWWF The peak wet weather inflow over a 24-hour time period resulting from a rainfall event.

Sizing of hydraulic facilities, some liquid stream
facilities, and flow equalization facilities.

PHWWF The hourly peak of wet weather inflow over a one-hour time period.

Sizing of hydraulic facilities, some liquid stream
facilities, and flow equalization facilities.

AAL The average load occurring during the dry season,
typically between the months of May and October.

Used for permitting and to understand base
loads into the system without addition from wet
weather patterns.

ADMML The average daily organic, nitrogen or suspended solids load occurring during the maximum load month of the
year. This is calculated as the maximum 30-day average
for the year. The maximum monthly load does not
necessarily occur during the same period as the maximum monthly flow.

Sizing of secondary treatment facilities, sludge
thickening facilities, and anaerobic digesters.

Notes:

AAF - average annual flow; AAL - average annual load; ADMMF - average daily maximum month flow; ADMML - average daily maximum month load; BWF - base wastewater flow; PDWWF - peak average daily wet weather flow; PHWWF - peak hourly wet weather flow

5.5.2 Historic Flows

5.5.2.1 Annual Flows
Before discussing existing and future flows that were developed for this update to the Master Plan, it is important to first take a look at historical flows and trends over the last several years. The City provided historical influent flow data at the WWTP for period of 2018 through October 2023, with more data available through their existing reporting programs.

The WWTP monthly annual average flows for the five full-year data sets between 2018 and 2022 of 6.8 to

7.4 at the WWTP are summarized in Table 5.4.

Table 5.4 2020 Historical Flows Per Capita
Year(1) AAF at WWTP(2) (mgd) Annual Flow Per Capita (gpcd) 2018 7.39 69.9
2019 6.80 64.2
2020 7.30 66.6
2021 6.95 63.3
2022 7.31 66.4
Average 7.15 66.1
Notes:
gpcd - gallons per capita per day
(1) Population sourced from https://www.census.gov/ data. (2) Data supplied by City. Includes net flow from LCSD, septage flow, and tracks all other flows into the plant.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-6
Monthly average flows provide a glimpse of how the seasons and changing weather patterns affect the influent flow into the WWTP. Figure 5.3 provides the average flow per month over the last five years. In Santa Maria, contrary to other communities, monthly average flow increases in the summer months, and decreases in the winter months. This is an inverse correlation to precipitation, which is shown by the orange line in Figure 5.3. The anomaly is mainly due to the harvest season, during which there is significantly more crop processing and more seasonal workers employed by the agricultural community to help with the crop harvesting. The harvest season also correlates with higher wastewater flows from significant industrial users who discharge more wastewater from agricultural processing.

Figure 5.3 Average Monthly Flows to Santa Maria WWTP (2018-2022)

5.5.3 Peak Flows

5.5.3.1 Peak Daily Flows
The peak daily flows are important for sizing hydraulic facilities. Similar to the annual average, understanding the peak daily flows entering the plant on a monthly basis helps to size individual processes and treatment units. From this information, the peaking factor for each month of the year can be calculated. This section summarizes the peak 24-hour average flows (the days where the daily flow average sustained a maximum). Table 5.5 and Figure 5.4 illustrate the single maximum 24-hour flow observed in each month spanning from 2018 through 2023, and the associated peaking factor.

As shown, the peaking factors are lowest in the summer time (around 1.1) and highest in the winter time, corresponding to the rainy season. The largest peaking factor of 1.5 occurred in the month of January.

Table 5.5 Daily Average Monthly Maximum Flows From 2018-2023 Month Monthly Average Flow (mgd) Maximum Daily Average Flow (mgd) Peaking Factor January 6.9 9.3 1.4
February 7.2 10.2 1.3
March 7.4 9.9 1.3
April 7.1 8.5 1.2
May 7.0 9.1 1.5
June 7.5 9.3 1.1
July 7.6 9.0 1.1
VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-7
Month Monthly Average Flow (mgd) Maximum Daily Average Flow (mgd) Peaking Factor August 7.6 9.5 1.1
September 7.4 10.2 1.3
October 7.4 9.6 1.2
November 7.1 9.7 1.4
December 6.8 8.9 1.2
Figure 5.4 Maximum Observed Daily Average Flow per Month Into Santa Maria WWTP (2018-2023)

5.5.3.2 Peak Hourly Flows
In contrast with the section above, the following peaking factors compare the highest hourly peak flow observed in a given month with the average flow for the respective month for the period of 2018 through 2023. The difference between peak hourly and peak daily average flows (presented in the previous section) is that this section finds the highest peak flow observed in a peak hourly loading event, while the previous section finds the highest daily average in a monthly period. Peak hour flows are used for confirming the hydraulic capacity of facilities.

Table 5.6 and Figure 5.5 summarizes the peaking factors relative to the annual average and the maximum peak hourly flows observed per month between 2019 through 2023. As shown, peak hour peaking factors ranged from 1.7 to 2.6. The highest hourly flow that the WWTP experienced over the 5-year period was

17.1 mgd, which occurred in the month of December. This peak flow mark corresponded with the maximum peaking factor of 2.6 observed over the time period.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-8
Table 5.6 Peak Hourly Monthly Maximum Flows From 2018-2023 Month Average Flow (mgd) Peak Hourly Flow (mgd) Peaking Factor January 6.9 15.0 2.0
February 7.2 12.9 1.7
March 7.4 14.9 2.0
April 7.1 12.7 1.8
May 7.0 12.9 1.7
June 7.5 11.5 1.5
July 7.6 11.9 1.6
August 7.6 12.5 1.7
September 7.4 13.3 1.7
October 7.5 12.6 1.8
November 7.2 12.8 1.7
December 6.8 17.1 2.6
Figure 5.5 Maximum Observed Hourly Flow per Month Into Santa Maria WWTP (2019-2023) VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-9

5.5.4 Modeled Flow Scenarios
Table 5.4, presented earlier, summarized the historical per capita wastewater generation within the City service area and the annual average flows to the WWTP. The annual average wastewater flow was variable over the five-year period, with an average of 7.15 mgd, and the per capita flow varied between 63 and 69 gpcd over the same period, with an average of 66.1. The observed fluctuations in the per capita flow and overall annual average flows are likely due to a number of factors including continued efforts towards water conservation, variable rainfall (inflow and infiltration), etc. For the purposes of this Master Plan update a per capita wastewater generation flow rate of 67 gpcd was assumed to represent status quo conditions; baseline, or no-change conditions.

5.5.4.1 Regulatory Considerations
The Regulatory Reduction flow projection scenario in Table 5.7 was developed using multiple sources, including the Santa Maria 2020 Urban Water Management Plan and the 2012 Utility Capacity Update, developed by Water Systems Consulting.

The impetus for this scenario was to find the water usage per capita of residential, commercial, and industrial sources, and then utilize known sewer flow data and water to sewer factors to develop a sewer projection considering mandatory reductions in per capita usage. In 2022, the California state Legislature passed an update to a 2018 water conservation law, mandating that residential water consumption must decrease to 42 gpcd by 2030. California Water Code §10609.4 states that until January 2025, the standard for indoor residential water use shall be 55 gpcd. Thereafter, until January 2030, the standard shall be 47 gpcd. After January 1, 2030, the standard shall be 42 gpcd. It is important that the State of California, in conjunction with this mandate, provides stipulations that give the City time to complete studies regarding communities and actual water usages. As a result, the Regulatory Reduction scenario is a low-end rate that may not ever be reached. However, it is important to consider with respect to future conservation and efficiency efforts.

5.5.4.2 Flow Projections
The projected sewer rates can be found by assuming only residential water usage declines, and industrial and commercial sources will remain at their existing levels of water consumption. The current 2020 water usage per capita, along with developed sewer to water usage factors are shown in Table 5.7.

Table 5.7 Sewer to Water Usage Factors With 2020 Water Consumption Data Source 2020 Water Usage Per
Capita (gpcd)
Sewer to Water Factor(1) 2020 Sewer Flow Per Capita
(gpcd)
Residential 60.5 0.825 50.0
Commercial 16.2 0.8 13.0
Industrial 6.8 0.6 4.0
Total - - 67
Notes:
(1) Appendix R illustrates how the Sewer to Water Factor Flow for industrial users was determined.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-10
The current 2020 sewer flow per capita, using the factors shown in Table 5.8, corresponds to the observed flow of 66.6 gpcd. By reducing the residential water usages linearly to 2060, we can project a per capita sewer flow considering the mandatory cuts that will be enforced in the time frame of this Master Plan.

When applying the sewer factors and the mandatory cuts shown for residential only, we obtain a total sewer flow rate of 51 gpcd. For conservative estimates, we assume 50 gpcd for the following flow projections.

Appendix R illustrates how the industrial sewer to water factor was determined.

In order to project future flows to the WWTP and to account for climate change, continued water conservation, and other potential reductions in wastewater flows, three per-capita wastewater flow scenarios were considered in addition to the "no-change" alternative discussed above. These are presented in Table 5.8 and result in a per-capita flow ranging from 50 gpcd to 67 gpcd.

Table 5.8 Flow Reduction Scenarios for Projection Modeling Scenario Description Per Capita Flow
(gpcd)
No-Change Wastewater flows will on-average remain the same until 2060. The 2018-2020 average per-capita rate will be projected as the baseline. 67 Mild Reduction Wastewater flows, due to mild droughts, and continued water conservation compliance, will reduce by 7 percent on average by 2060. 60 Moderate Reduction Wastewater flows, due to moderate droughts, along with stringent water conservation compliance, will reduce by 14 percent on average by 2060. 55 Regulatory Reduction Residential usage is mandated to reduce to 42 gpcd, corresponding to a 50-gpcd flow.
50 Therefore, for the purposes of this Master Plan, it was decided to estimate future wastewater flows based on the four per capita flow scenarios presented in Table 5.8. The lowest flow condition, corresponding to the Regulatory Reduction scenario shows a per capita flow value of 50, as noted, it takes into account the 2030 goal of 42 gpcd and assumes some increase based on contributions from industrial and commercial customers that brings up the value to 50 gpcd. All three scenarios below the "no-change" scenario are more conservative than the historical per capita rates and would include potential higher flow from non-residential users. Each of these scenarios was modeled to determine the projected future flowrates, presented below.

5.5.5 Wastewater Flow Factors
In order to develop the wastewater flow projections, the aforementioned per capita flow was utilized along with the previously developed population projections. The population projections take into account the expected growth in the City and assign individual wastewater flow factors on a per person basis.

5.5.6 Buildout Determination
On account of the Santa Maria General Plan Update, the provided horizon for buildout is 2045, wherein the General Plan shall allocate and permit sufficient space and buildings for the City's expected growth. As such, the plan allocates a minimum of 16,000 housing units, and a minimum of 8,500 jobs to be acquired by that timeframe. The WWTP must be able to accommodate the additional flow expected from such a buildout.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-11
Since this chapter assesses the growth to 2060, the projected total populations found in the General Plan have been extrapolated for 15 additional years, at modest growth rates. This will allow for a conservative estimate of what will be required for the City's WWTP, using per capita flows.

5.5.7 Wastewater Flow Projections
Figure 5.6 illustrates the AAF projections to 2060 considering the four conservation scenarios. The following figure depicts the increase in flow purely as a result of population growth and excluding any LCSD or septage flows.

Figure 5.6 Flow Projections With Selected Scenarios

5.5.8 Contributing Agency Flows
The two primary contributing entities to Santa Maria WWTP influent are LCSD, currently under agreement, and septage contributors. Per the assumptions, this projection assumes that septage and LCSD will remain largely the same, but with modest increases. The modest increases will be 100 gpd per year for septage, and increased flows of 0.001 mgd per year from LCSD. It was assumed that these contributors would not be subject to the water conservation restrictions and were therefore increased linearly in this modeling effort, as shown in Figure 5.7. Both of these contributing flows are minor compared to the City service area flows and not expected to impact the overall flow projections.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-12
Figure 5.7 Flow Projections of Contributing Agency Flows

5.5.9 Total Flows
This projection accounts for both the assumed growth in LCSD flows, and the projected increase in septage. The total projected flows estimated with population and considering the conservation scenarios are shown in Figure 5.8.

Note that the total flow is expected to reach 10.3 mgd in 2060 assuming current trends continue; baseline or no-change scenario. For the mild reduction to 60 gpcd, the flow will reach about 9.4 mgd. For the most aggressive flow reduction scenario (Regulatory Reduction), the average annual influent plant flow is not expected to exceed 8.0 mgd. However, the organic, solids and nitrogen concentrations will continue to increase as flows decrease and the population increases. This is discussed in the next section.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-13
Figure 5.8 Total Flow Projections at Selected Scenarios (Including Contributing Agency Flows)

5.6 Wastewater Loads
This section summarizes the existing and projected wastewater loads for the Santa Maria WWTP.

Historical wastewater loads were analyzed for the City service area only. Wastewater loading will provide the basis of design for the planned expansion.

5.6.1 Carbonaceous Biochemical Oxygen Demand/Biochemical Oxygen Demand Ratio
As noted in Volume 2, Chapter 4, the City is now under a new General Permit, which has set more stringent treated effluent limits.

Considering that CBOD was the previous reporting metric, a ratio comparing the two must be developed to assess the effect of future loads and permit requirements. The CBOD/BOD5 ratio has been tracked in both textbooks and projects of similar size to Santa Maria. A sampling event in December 2023 at the WWTP also tracked CBOD and BOD5. By comparing the ratio from the seven-day sampling event to historical values, and those reported in textbooks and research papers, the calculated value for use here is considered to be reasonably accurate.

Based on the sampling data and literature values, a 0.85 ratio between BOD5 and CBOD was used for this planning effort.

5.6.2 Historic Loading Characteristics

5.6.2.1 Average Annual Loading
The following indicates the loading characteristics into the WWTP from 2018 through 2022. Historical loading is separated on a monthly basis in order to track the seasonal variability of flow and loads to the WWTP.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-14
Figure 5.9 illustrates the loading of TSS, BOD5, CBOD, total Kjeldahl nitrogen (TKN), and NH3-N. The annual average design loading criteria for BOD5 and TSS upon which the WWTP was designed are also shown; both are approximately 33,000 pounds per day (lb/day). TKN and NH3-N are reported on a quarterly basis historically and thus are reflected as such in Figure 5.9.

Figure 5.9 Historical Monthly Loading Characteristics
Note that in the higher flow months from August to October, the design limit for BOD5 is approached.

This is a current metric and illustrates some of the existing challenges faced by the WWTP.

5.6.2.2 Maximum Monthly Loading
Maximum monthly loads are determined using historical data and peaking factors. Using average and maximum loads seen from 2018 through 2022, peaking factors can be developed for TSS, BOD5, TKN, and ammonia. TKN and ammonia have been reported quarterly on a historical basis, and thus only quarterly values were used to develop the peaking factors shown in Table 5.9.

Table 5.9 30-Day Maximum Peaking Factors for Wastewater Characteristics Month TSS BOD5 TKN Ammonia
January 1.88 1.56 1.47 1.17
February 1.33 1.28
March 1.23 1.31
April 1.19 1.42 1.66 1.14
May 1.27 1.21
June 1.46 1.40
July 1.23 1.43 1.55 1.09
August 1.34 1.42
September 1.26 1.15
VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-15
Month TSS BOD5 TKN Ammonia
October 1.40 1.43 1.37 1.17
November 1.51 1.23
December 1.18 1.17
Average 1.36 1.34 1.51 1.14

5.6.3 Contributing Agency Loads and Septage
The loads from LCSD and from septage are included in the per capita loading. Historical values reported for the WWTP include both sources, and as such are wholistically included in the per capita values.

5.6.3.1 Septage
It is important to track the septage loading, as septage varies over time, and can produce slug loads for the plant to treat. Table 5.10 shows the average and daily maximum BOD5 load entering the plant, and the impact of such loads as a percentage of the average incoming load. Note that the plant recorded BOD5 data for the septage concentrations between 2010 and 2015, but was not able to continue such monitoring thereafter. For the purposes of this Master Plan, it was assumed that the 2010-2015 BOD5 concentrations are representative of the period from 2018 through 2023. The plant continued recording septage flows to 2023. As indicated, on average, septage contributes about 2.2 percent of the incoming BOD5 load to the plant. During the 2008 plant expansion project, it was assumed that septage haulers would dump an average of 65,000 gpd with an average BOD5 concentration of 8,000 mg/L, resulting in a BOD5 load of 4,336 lb/day; significantly more than is shown in Table 5.10.

Further evaluation of the contributions of septage to the incoming BOD5 and nitrogen loads is underway.

Volume 13 Chapter 5 of this Master Plan provides an update on the additional analysis performed on the loading contributions from septage.

Table 5.10 Septage Loading Characteristics
Year Average Daily Septage
BOD5 (lb/day)(1)
Max Daily Septage BOD5
(lb/day)
Percentage of Average Daily
Loading(2)
2018 747 1,671 2.4%
2019 828 1,853 2.7%
2020 681 1,523 2.2%
2021 580 1,297 1.9%
2022 685 1,532 2.2%
2023 639 1,429 2.1%
Average 693 1,551 2.2%
Notes:
(1) Calculation based on the average BOD5 concentration for the years 2010-2015. (2) As compared to 2018-2023 average influent loads.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-16

5.6.3.2 Consolidation Loads
It was noted in Volume 2, Chapter 2 that the City of Guadalupe has received a suggestion from the Water Board that they consider pumping their roughly 0.5 mgd of wastewater to the Santa Maria WWTP for treatment, rather than treat it themselves. As of that date of writing this Chapter, flow and quality information from the City of Guadalupe has not been received, and therefore the impact of future loads from this source on the Santa Maria WWTP has not yet been accounted for.

5.7 Water Reuse/Disposal
Currently, the City sends all of their effluent to 15 percolation ponds for disposal and there is no off-site water reuse. All ponds are located within the property, and ponds in operational use are drained and refilled on a weekly to monthly basis to allow time for off-line ponds to dry out sufficiently for routine maintenance. As such, pond volumes vary throughout the year to account for seasonal and diurnal flow, along with offline periods. Appendix S includes an aerial view of the site that shows the current percolation ponds and their location relative to the treatment facilities.

In the most recent year, 2023 through 2024, the seasonal variation can be observed with net percolation rates. Net percolation accounts for average percolation and evaporation at the site, which was derived from an evaporation pan study conducted by GSI Water Solutions. Figure 5.10 illustrates the net percolation on a monthly basis in mgd for one full year from July 2023 through to June 2024.

Figure 5.10 Net Percolation Into the Percolation Ponds
The average net percolation into the ground for the one-year period was 7.1 mgd, with a seasonal high of 9 mgd in July. Overall, there was no net accumulation of volume in the percolation ponds, indicating that all incoming flow is able to percolate.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-17
However, moving forward and considering that the percolation ponds are aging, and their percolation rates have declined as solids accumulate within the soil, an additional pond area will be needed to address future flows. Further discussion of the existing pond condition and performance is presented in Volume 7 - Water Reuse and Disposal, together with a discussion regarding the additional pond area to be provided in the future and its location.

Volume 7 also includes a discussion on potential alternatives to provide recycled water as an option for treated effluent disposal.

5.8 Loading Projections

5.8.1.1 Projected Annual Loading
Historically, Master Planning focused on incoming flow as the metric for determining the need for WWTP expansions. That was a good metric when BOD5 and TSS concentrations were relatively stable. However, since increase of water conservation initiatives, WWTPs have seen declining flows and associated increases in organic, solids and nutrient concentrations. Accordingly, using the organics, solids and nutrient loads (expressed in lb/day) entering a WWTP has become a more accurate approach to assessing the need for treatment plant expansions, rather than considering flow alone. Consideration of flow is still required for assessing the hydraulic capacity of treatment facilities. Organic and nutrient loads (lb/day) produced by households should be relatively consistent and would be largely independent of the flow entering the sewer system from in-house uses such as bathing, cooking, washing, etc. As such, the per capita loading provides a reasonable measure of how the WWTP load will be expected to increase as the population increases. Using the values presented in Section 5.6, Table 5.11 presents the calculated historic loading per capita for TSS, CBOD, TKN, and NH3-N for the period of 2018 to 2020.

Table 5.11 Per Capita Loading Characteristics From 2018-2020 lb/day Per Capita 2018 2019 2020 Average
TSS 0.237 0.223 0.209 0.223
CBOD 0.239 0.223 0.229 0.230
TKN 0.042 0.040 0.041 0.041
NH3-N 0.027 0.030 0.029 0.029
Using the 2018 to 2020 averages from Table 5.11, the projected loading of TSS, BOD5, TKN, and ammonia was developed based on the population projects and is presented in Figure 5.11. A conversion factor of

0.85 (CBOD is 0.85 times smaller than BOD5) was used to estimate the BOD5 values based on the measured CBOD. The design averages from the 2008 expansion for the plant are also depicted to illustrate when the loading is expected to exceed the design values for the existing WWTP.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-18
Figure 5.11 Projected Annual Loading Characteristics
Based on the projected values, the BOD5 average design loading is expected to exceed the current plant capacity by 2031. This is important to note as any expansions will need to be operational by then, or other interim measures will need to be in place to maintain performance that meets the permit limits.

As discussed earlier, the existing plant already experiences BOD5 loads that are close to or at the design value (33,050 lb/day) during the peak agricultural season (August to October). This trend is expected to continue into the future, so there will be times between now and when the new plant is constructed that the plant will be overloaded and the effluent quality is expected to reflect this.

5.8.1.2 Projected Peak Loading
Using the peaking factors described in Section 5.6.2, we can determine the future peak flows using the projected annual loading values. The historical peak loading factors projected to 2060 are shown in Table 5.12, which will be used for planning purposes.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-19
Table 5.12 2060 Peak Loading Estimates
Constituent Historical Average Loading Factors 2060 Peak (lb/day) TSS 1.36 46,067
BOD5 1.34 55,083
TKN 1.51 9,508
NH3-N 1.14 5,012

5.8.2 Projected Concentrations
The anticipated concentrations of TSS, BOD5, and total nitrogen were estimated based on the calculated loads and the previously discussed per capita flow scenarios. Given the variability in the future flow projections (Figure 5.8), the concentrations will aid in determining removal efficiencies of individual treatment processes. As such, Table 5.13 indicates the projected concentration range for each parameter, and Figures 5.12 to 5.14 show how the concentrations are expected to vary for each flow scenario with time out to 2060.

Table 5.13 indicates, based on different flow projections, that TSS concentrations, for example, will range from 390 to 550 mg/L through to 2060. This means that removal efficiencies of plant process units shall be upwards of 95 percent for TSS by the target date of this Master Plan. Table 5.13 includes the required removal efficiencies of the three parameters to meet the permit limits.

Table 5.13 2060 Concentrations Across Flow Scenarios
Constituent Influent Concentration Range
(mg/L)
Regulatory Limit (2020 General Order)
(mg/L)
Required Removal Efficiency
to Achieve Limit (%)
TSS 390-550 30 94.5
BOD5 475-675 30 95.5
Total Nitrogen(1) 70-105 10 90.5
Notes:
(1) Total nitrogen includes TKN, nitrite, and nitrate.

This ultimately means that the future plant will need to achieve high removal efficiencies at different flow ranges, with up to 96 percent removal of BOD5 during the peak concentrations.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-20
Figure 5.12 Projected Annual TSS Concentrations Over Different Flow Scenarios Figure 5.13 Projected Annual BOD5 Concentrations Over Different Flow Scenarios VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-21
Figure 5.14 Projected Annual BOD5 Concentrations Over Different Flow Scenarios

5.9 Basis of Design/Summary
The flow and loading projections developed in this chapter will be used in subsequent chapters as the basis for the collection system and unit process capacity determinations. Table 5.14 summarizes the annual average flow projections and treatment capacity required for each constituent. The "mild reduction" flow scenario (60 gpcd) will be used as the basis and a conservative estimate. As shown in the table, the "mild reduction" flow scenario still results in a gradual increase in flow to the plant around

9.3 mgd (annual average) in 2060.

Table 5.14 Basis of Design for Average Loading and Flows to 2060 Year Flow (mgd) TSS (lb/day) BOD5 (lb/day) TKN (lb/day) NH3-N (lb/day) 2020 7.3 24,000 29,100 4,300 3,100
2030 8.0 27,000 32,800 5,000 3,500
2040 8.7 30,400 37,000 5,600 3,900
2050 9.1 32,300 39,200 6,000 4,200
2060 9.3 34,000 41,300 6,300 4,400
Table 5.15 lists the Basis of Design for Peak Loading and Flows to 2060. The "mild reduction" scenario (60 gpcd) was used as the starting point. The peak hourly flows were calculated based on a peaking factor of 2.0, which is the average of the maximums shown earlier. Peak loadings were based on the same peak loading factors shown above.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-22
Table 5.15 Basis of Design for Peak Loading and Flows to 2060 Year Flow (mgd) TSS (lb/day) BOD5 (lb/day) TKN (lb/day) NH3-N (lb/day) 2020 14.6 34,000 39,000 6,700 3,500
2030 16.0 38,000 44,000 7,600 4,000
2040 17.4 43,000 49,000 8,500 4,500
2050 18.2 45,000 52,000 9,000 4,800
2060 18.6 48,000 55,000 9,500 5,000

5.9.1 Timing for Plant Expansions to 2060
Based on the design basis information presented above, and understanding the timeline required for design, construction, and start-up of a new treatment facility, preliminary phasing trigger curves for annual average influent flow and loading were developed out to 2060. These are shown in Figures 5.15 and 5.16, respectively.

Figure 5.15 shows the flow-based trigger curve and indicates that two plant expansions are anticipated to address growth through 2060. A Phase 1 expansion coming online around 2033, followed by a Phase 2 expansion coming online about 20 years later. For each expansion, the anticipated duration for planning, design, and construction are shown. The Phase 1 expansion is currently in the planning phase and when constructed would take the plant capacity to a nominal 10 mgd. Under the "no change" per capita flow scenario, planning for the Phase 2 expansion to increase the hydraulic capacity to 11.5 mgd would need to begin in 2042.

Figure 5.15 Trigger Curve for Phased Plant Expansions to 2060 Based on Flow VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-23
Corresponding constituent loads to the plant with time are shown in Figure 5.16. The dominant constituents are BOD5 and TKN. Completion of the Phase 1 expansion around 2033 corresponds to approximately when the current plant capacity will be exceeded. The Phase 1 expansion will increase BOD5 capacity to about 43,000 lb/day, which should carry the plant through to 2052 with about 10 percent remaining capacity when the Phase 2 expansion comes on line. Phase 2 will increase the BOD5 capacity further. The TSS loads will be addressed as part of the BOD5 load increases. For nitrogen removal, the Phase 1 plant will be designed with a TKN capacity of 6,600 lb/day. This should be sufficient to treat all loads to the plant through 2052, with about 10 percent excess capacity remaining when the Phase 2 expansion comes online.

Figure 5.16 Trigger Curve for Phased Plant Expansions to 2060 Based on Load VOLUME 2 / CHAPTER 6: BASIS OF COST ESTIMATES AND FINANCIAL PLANNING CONSIDERATIONS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-1
CHAPTER 6 BASIS OF COST ESTIMATES AND FINANCIAL

PLANNING CONSIDERATIONS

6.1 Purpose
The purpose of this chapter is to summarize the factors, assumptions, and methodology used for estimating O&M and capital costs for the update of the Master Plan. In addition, the methodology used for producing a life-cycle cost analysis to compare alternatives is summarized.

6.2 Background
This Master Plan, when completed, presents an updated plan that meets the expansion and replacement needs of the City's water treatment systems until 2060. Consistent assumptions and criteria for development of O&M and capital costs and life-cycle cost analyses are necessary to facilitate fiscal planning.

6.3 Level of Accuracy
The costs shown herein are estimates and are prepared as guidance for project evaluation and planning purposes using limited information available at the time of the estimate. More accurate and detailed cost estimates should be prepared during the preliminary design phase of each project in which alternative analyses would be conducted to determine the best alternative for the City using the most up-to-date information at that time. The criteria presented in this chapter were used to develop total costs for each project as a planning level estimate. For this reason, based on AACE International's definitions of the five "class estimates" in AACE International Recommended Practice No. 18R-97 (see Appendix T), the classification of costs presented in this update of the Master Plan are Class 4 estimates. The expected accuracy of any estimates included herein is 50 percent over the estimate to 30 percent under the estimate.

6.4 Operations and Maintenance Costs
O&M costs include the labor, supplies, and utility costs for operations, preventive and corrective maintenance, inspections, and repair and replacement of parts. O&M costs are based on the information provided by the following:
 Historical costs from recent Carollo Engineers (Carollo) projects.  Vendor-supplied costs.
 Costs supplied by City staff (i.e., power, labor, chemicals, and propane gas).  Calculations as necessary to supplement other sources.

VOLUME 2 / CHAPTER 6: BASIS OF COST ESTIMATES AND FINANCIAL PLANNING CONSIDERATIONS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-2
The cost estimates are generally based on applying the above information to flow diagrams for main process systems, plant schematic layouts, and equipment lists that will be developed for the integrated update of the Master Plan. O&M costs are escalated for inflation as described in the capital cost section that follows.

6.5 Capital Costs
Capital costs consist of all the items that will be constructed/purchased for the projects that are being evaluated for the update of the Master Plan. The direct cost of each equipment item or process area will be based on the following:
 Vendor-quoted information.
 Cost curves based on historical costs from other Carollo projects or scale up or scale down of similar sized projects.
 Scale-up of prior construction costs to account for inflation, using existing and historical Engineering News-Record factors to scale up costs to 2024 dollars.
 Quantity take-off and unit prices when applicable information is necessary and available.

For most projects, depending on applicability, general factors will be added to the direct costs derived from the information listed above. These factors include the following:
 The costs of site work and yard piping, and electrical and instrumentation are estimated as percentages of the subtotal direct cost. Typical percentages are 15 percent for site work and yard piping and 20 percent for electrical and instrumentation, respectively.  The contingency is an amount added to the construction cost estimate to provide for undefined project elements and to reduce the risk for underestimation. The contingency usually ranges from 0 to 30 percent. For planning level estimates, which is the case here, the contingency used is 30 percent of the total direct cost.
 The added amount for general conditions includes the costs of mobilization/demobilization, bonds and insurance, contractor temporary project facilities and supervisory personnel, testing, start-up, and other constraints. A general conditions allowance of 12.5 percent of the total direct cost plus contingency is added.
 General contractor overhead and profit refers to the general contractor's home office overhead and profit. It is estimated to be 15 percent of the subtotal of the above costs.  The cost of the project at approximate mid-point of construction is predicted by escalating current costs. Over the last 50 years, the average inflation rate determined by the Consumer Price Index (CPI) has been 3.7 percent. For the 12-month period ending May 2026, the annual inflation rate as determined by the CPI was 4.2 percent, higher than where the Federal Reserve would like it to be.

Given that the Federal Reserve is maintaining a restrictive monetary policy to reduce inflation, it seems reasonable for planning purposes to use the historical rates to estimate escalation to the mid-point of construction. Accordingly, for this Master Plan, a value of 3.7 percent will be used.  Based on the sales tax rate for Santa Barbara County, sales tax is estimated at 8.75 percent on materials. The materials cost is assumed to equal 50 percent of the total direct cost and contingency.

VOLUME 2 / CHAPTER 6: BASIS OF COST ESTIMATES AND FINANCIAL PLANNING CONSIDERATIONS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-3
 Bid market allowance is an escalation factor intended to account for unfavorable bidding conditions due to the current construction market. Because this project will not bid for another four years, it is not possible to predict the bidding environment at that time. Therefore, no bid market allowance will be included.
 Engineering, management, and legal are also included to determine the total project cost. This covers engineering, design and construction oversight costs, regulatory compliance, legal fees, as well as City administration expenses to oversee the project from design through construction. For this project, a factor of 32 percent of the total construction cost is used, including all above items.

6.6 Life-Cycle Costs
In order to evaluate different alternatives for upgrading the existing Santa Maria facilities, life-cycle cost analyses will be performed to determine which alternative is the best from an economic standpoint.

Life-cycle cost analyses determine the present worth of both capital costs and annual O&M costs for each alternative over a 30-year period. Factors considered in the life-cycle costs include the escalation rate, cost of capital (discount rate), capital loan period, and the life-cycle period. These values are as discussed and defined below:
 Escalation rate – equal to the inflation rate of 3.7 percent and used to estimate the capital cost at the mid-point of construction, and the annual increase in O&M costs.  Interest rate – the rate at which the loan for the capital amount will be funded. The City is considering loans from the federal Water Infrastructure Finance and Innovation Act (WIFIA) and the California Clean Water State Revolving Fund (SRF). WIFIA loan interest rates are determined by the United States Treasury yield curve on the day the loan is closed. For 2026, the 30-year US Treasury yield curve varied between 4.7 and 5.2 percent. Recent rates for SRF loans have been between 1.7 and 2.3 percent.

Because the WIFIA program loans substantially greater sums than the SRF program (limited to $50 million), and because of the magnitude of the anticipated cost to upgrade the WWTP, the interest rate for repaying a potential loan has been based on repaying a WIFIA loan; at an assumed interest rate of 5 percent.
 Discount rate – the difference between the rate of inflation and the interest rate for repayment of the loan to fund the project. Based on the above, the Discount Rate was set at 1.3 percent.  Loan period – equal to 30-years for a WIFIA loan.
 Life-cycle period – 30-years.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A 1948 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-1
The 1949 aerial shows the wastewater treatment plant after its 1948 expansion. The below image indicates the whole area with the current City of Santa Maria property line included.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B 1967 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-1
1967 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX C 1981 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN C-1
1981 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX D 2006 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN D-1
2006 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX E 2016 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN E-1
2016 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX F BIOLOGICAL RESOURCES MEMO

CARLSBAD
CLOVIS
IRVINE

LOS ANGELES

PALM SPRINGS

POINT RICHMOND

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
285 South Street, Suite P, San Luis Obispo, CA 93401 805.782.0745 www.lsa.net

MEMORANDUM
DATE: July 8, 2024
TO: Graham J.G. Juby, Carollo Engineers
FROM: Kelly McDonald, LSA Biologist
SUBJECT: Biological Resources Technical Memorandum for the Santa Maria Wastewater Treatment Project located at 601 South Black Road, Santa Maria, incorporated Santa Barbara County, California
The Biological Resources Technical Memorandum describes and documents potential biological resources—including special-status species, sensitive habitats, and other regulated resources of concern—within the Santa Maria Wastewater Treatment Project (project) located at 601 South Black Road, Santa Maria, Santa Barbara County, California (see Figure 1, all figures are provided in Attachment B). This document provides a summary of existing survey information, identifies potentially sensitive areas within the project site, and discusses the suitability of the site to support habitat for special-status plant or animal species. Currently, no site plans are available; therefore, an impact analysis and recommended mitigation measures regarding biological resources cannot be determined at this time. Once project plans are finalized, a detailed impact analysis will be prepared in order to support the California Environmental Quality Act (CEQA) process.

PROJECT SETTING
The project site is located in Sections 17, 18, and 20 of Township 10 North, Range 34 West on the United States Geological Survey (USGS) Guadalupe and Santa Maria, California, 7.5-minute topographic quadrangles map (see Figure 1). The project site is located within the city limits of Santa Maria and consists of four legal parcels (Assessor’s Parcel Numbers [APNs] 113-120-034, 117-191-010, 117-820-002, and 117-191-013) including APN 113-120-034, which is the Santa Maria Wastewater Treatment Plant (WWTP). The project site discussed in this document refers to all areas within the approximately 461-acre property where future permanent and temporary construction-related ground disturbance could occur.

Approximately one half of the project site is developed consisting of treatment ponds, pumps, tanks, clarifiers, and associated buildings with the WWTP. The remainder of the site consists mainly of agricultural row crops with sparse cover of ruderal vegetation along the margins of the fields (see Figure 2). Several irrigation ditches are also present along the road shoulders and in the WWTP.

According to historic aerial imagery, vegetation within the project site is subject to regular anthropogenic disturbance associated with the operations of the existing facilities (i.e., vegetation clearing, facility maintenance, and agriculture), and the site has remained in its current condition for more than 20 years. Adjacent parcels consist of agricultural fields to the north, south, east, and 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 2 west; Ray Road to the west; an irrigated pasture and Atlas Performance Industries (API) Trailers to the east; Santa Maria Railroad right-of-way to the south; and an auto wrecking yard is located to the west. There are no undisturbed open spaces in the vicinity of the project site.

The project site is located within the Central Coast Sub-region of the California Floristic Province (Baldwin, et al. 2012) and within the Corralitos Canyon watershed (Hydrologic Unit Code 180600080503). The project site is relatively flat with almost no topographic variation and is at approximately 168 feet above mean sea level. There are several irrigation ditches present within the project site; however, these features are maintained and have no downstream connection to other waters.

METHODS
Literature Review and Records Search
LSA Biologist Kelly McDonald conducted a literature review and records search on May 6, 2024, to identify the existence and potential for occurrence of sensitive or special-status1 plant and animal species in the vicinity of the project site. Federal and State lists of sensitive species were also examined. Current electronic database records reviewed included the following:
• California Natural Diversity Database (CNDDB – RareFind 5), which is administered by the California Department of Fish and Wildlife (CDFW). This database covers sensitive plant and animal species as well as sensitive natural communities that occur in California. Records from nine USGS quadrangles including and surrounding the project site (Oceano, Nipomo, Huasna Peak, Guadalupe, Santa Maria, Twitchell Dam, Casmalia, Orcutt, and Sisquoc) were obtained from this database to inform the field survey (CDFW 2024a). • California Native Plant Society’s (CNPS) Electronic Inventory of Rare and Endangered Vascular Plants, which utilizes four specific categories or “lists” of sensitive plant species to assist with the conservation of rare or endangered botanical resources. All of the plants constituting California Rare Plant Ranks 1A, 1B, 2A, and 2B are intended to meet the status definitions of “threatened” or “endangered” in the California Endangered Species Act (CESA) and the California Fish and Game Code and are considered by CNPS to be eligible for State listing. At the discretion of the CEQA Lead Agency, impacts to these species may be analyzed as such, pursuant to the State CEQA Guidelines Sections 15125(c) and 15380. Plants in Rank 3 (limited information, review list), Rank 4 (limited distribution, watch list), or that are considered Locally Unusual and Significant may be analyzed under CEQA if there is sufficient information to assess potential significant impacts. Records from the nine USGS quadrangles surrounding the project site were obtained from this database to inform the field survey (CNPS 2024). 1 For the purposes of this report, the term “special-status species” refers to those species that are listed or proposed for listing under the CESA and/or the Federal Endangered Species Act (FESA), California Fully Protected Species, and California Species of Special Concern. It should be noted that “Species of Special Concern” is an administrative designation made by the CDFW and carries no formal legal protection status. However, Section 15380 of the CEQA Guidelines indicates that these species should be included in an analysis of project impacts if they can be shown to meet the criteria of sensitivity outlined therein. 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 3 • United States Fish and Wildlife Service’s (USFWS) Information for Planning and Conservation (IPaC) Online System, which lists all proposed, candidate, threatened, and endangered species managed by the Endangered Species Program of the USFWS that have the potential to occur on or near a particular site. This database also lists all known critical habitats, national wildlife refuges, and migratory birds that could potentially be impacted by activities from a proposed project. An IPaC Trust Resource Report (USFWS 2024a) was generated for the project site. ○ Designated and Proposed USFWS Critical Habitat Polygons were reviewed to determine whether critical habitat has been designated or proposed within or in the vicinity of the project site (USFWS 2024b).
○ The USFWS National Wetlands Inventory was reviewed to determine whether any wetlands or surface waters of the United States have been previously-identified in the project site (USFWS 2024c).
○ eBird: eBird is a real-time, online checklist program launched in 2002 by the Cornell Lab of Ornithology and National Audubon Society. It provides rich data sources for basic information on bird abundance and distribution at a variety of spatial and temporal scales. eBird occurrence records within the project site and within a 5-mile radius around the project site were reviewed in May 2024 (eBird 2024).

In addition to the databases listed above, historic and current aerial imagery, existing environmental reports for developments in the project vicinity, and local land use policies related to biological resources were reviewed.

Field Survey
LSA Biologist Kelly McDonald conducted a general biological survey of the project site on May 9, 2024, to document existing site conditions and the potential presence of sensitive biological resources. The project site was surveyed on foot, and all plant and animal species observed were recorded. Suitable habitat for any species of interest or concern was noted, and general site conditions were photographed (see Attachment C, Site Photographs). The field survey took place on a clear sunny morning with weather conditions conducive to the detection of plant and animal species.

RESULTS
Vegetation
Dominant vegetation within the project site consists of developed areas and agricultural row crops.

Other vegetation and land cover types include irrigation ditch, disturbed/ruderal, and disturbed/ barren. The identification and characterizations of vegetation communities generally follow the plant community descriptions in the Manual of California Vegetation (Sawyer et al. 2009).

Anthropogenic areas are those areas that have been converted from their natural habitat to ones that are subject to ongoing human maintenance and disturbance; these areas include roads, road shoulders, and areas that are disturbed or maintained. The acreages of each vegetation community 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 4 and land cover type occurring in the project site are provided in Table A, below, and are shown on Figure 3.

Table A: Vegetation and Land Cover Types Within the
Project Site
Vegetation / Land Cover Type Acreage1
Irrigation Ditch 0.91
Disturbed/Ruderal 2.51
Disturbed/Barren 16.17
Agricultural Row Crop 219.98
Developed 221.55
Total 461.12
Source: Compiled by LSA (2024).
1 All presented acreages are approximate and based on geographic information system measurements.

A total of 52 vascular plant species were identified within the project site during the 2024 field survey. See Attachment D for a complete list of plant species identified within the project site. The following describes the vegetation and land cover types occurring within the project site:
• Irrigation Ditch: Areas classified as irrigation ditch are features constructed in the uplands that carry stormwater and agricultural runoff the project site and adjacent agricultural properties.

Ruderal vegetation lines portions of the bottom and banks of these features. Commonly observed species include short pod mustard (Hirschfeldia incana), lamb’s quarter (Chenopodium album), Canadian horseweed (Erigeron canadensis), and other annual grasses. • Disturbed/Ruderal: The area classified as disturbed/ruderal is a storage area for agricultural equipment and contains non-native ruderal vegetation such sweet yellow clover (Melilotus officinalis), cheeseweed mallow (Malva parviflora), and short pod mustard. Because the area stores equipment and has worn equipment tracks, this area is considered disturbed. • Disturbed/Barren: Areas classified as disturbed/barren lack vegetation or support a very sparse cover of ruderal vegetation, with non-native plant species such as annual grasses being the most frequently encountered plant species. Several other invasive, pioneering plant species were also observed in these areas. These areas that surround the agricultural row crop and irrigation ditches are subject to regular vehicle use and disturbance associated with agricultural activities; therefore, this area is considered disturbed.
• Agricultural Row Crop: Areas classified as agricultural row crops consist of active food crops such as strawberries.
• Developed: Areas classified as developed consist of paved areas, buildings, and other areas that are cleared or graded for anthropogenic purposes. The WWTP is considered developed and is surrounded by paved roads, ornamental landscaping, or crushed gravel. 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 5 Soils
According to the Natural Resources Conservation Service (NRCS) online soil survey of northern Santa Barbara County, 11 soil types are mapped within the project site, as shown in Figure 4 and detailed in Table B, below. Based on the NRCS soil survey, Camarillo sandy loam is the only soil type considered hydric and is a Major Land Resource Area (MLRA). MLRAs are geographically associated land resource units that contain information regarding the physiography, geology, climate, water, soils, biological resources, and land use of each MLRA. Information described in each MLRA is used in statewide agricultural planning (NRCS 2024).

Table B: Soil Type Information
Map Unit
Symbol Map Unit Name Parent Material Drainage Class Hydric Soil Ca Camarillo sandy loam, 0 to 2 percent
slopes, MLRA 14
Alluvium derived from
sandstone and shale
Somewhat poorly
drained
Yes
CuA Corralitos loamy sand, 0 to 2 percent
slopes
Sandy alluvium Somewhat excessively
drained
No
CuC Corralitos loamy sand, 2 to 9 percent
slopes
Sandy alluvium Somewhat excessively
drained
No
CuD Corralitos loamy sand, 9 to 15 percent
slopes
Sandy alluvium Somewhat excessively
drained
No
MnA Metz loamy sand, 0 to 2 percent
slopes
Alluvium Somewhat excessively
drained
No
SeD Salinas and Sorrento loams, 9 to 15
percent slopes
Alluvium Well drained No
StA Sorrento sandy loam, 0 to 2 percent
slopes, MLRA 14
Alluvium derived from
sedimentary rock
Well drained No
StC Sorrento sandy loam, 2 to 9 percent
slopes
Alluvium Well drained No
SvA Sorrento loam, 0 to 2 percent slopes,
MLRA 14
Alluvium derived from
sedimentary rock
Well drained No
SvC Sorrento loam, 2 to 9 percent slopes,
MLRA 14
Alluvium derived from
sedimentary rock
Well drained No
TdF Terrace escarpments, loamy Loamy alluvium N/A No
Source: Source: Web Soil Survey (NRCS 2024).

MLRA = Major Land Resource Area
N/A = not applicable
NRCS = Natural Resource Conservation Service
Wildlife
A total of 27 wildlife species were observed on or near the project site during the 2024 survey.

Observed species included California scrub jay (Aphelocoma californica), white-crowned sparrow (Zonotrichia leucophrys), and California towhee (Melozone crissalis). Each of the 27 species observed commonly occur in and around Santa Barbara County. A list of wildlife species observed can be found in Attachment D.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 6 Resident and migratory bird species likely use the project site for foraging and nesting. However, the project site does not possess any characteristics that would indicate locally significant stopover points for migratory species, including raptors or waterfowl. Several common and special-status species are known to move throughout lands in the general vicinity.

Special-Status Biological Resources
The Santa Barbara region supports various special-status natural communities, plants, and animals.

Attachment E provides tables that identify those special-status plant and animal species known to occur or that potentially occur in the vicinity of the project (based on the literature review and experience in the region) and includes detailed information about each species’ habitat and distribution, State and federal status designations, and probability of occurrence within the project site. As stated in the methodology section above, the background research included occurrence records from nine USGS topographic quadrangles surrounding the project site. A USGS nine-quadrangle search covers a large, variable geographic and topographic area containing numerous habitat types not found within or around the project site. Special-status species that were observed or determined to potentially occur in the project site based on availability of suitable habitat or other factors such as plucking posts, scat, nests, dens, etc., are discussed below. Species determined unlikely to occur in the project site based on these same factors are documented accordingly in Attachment E and not discussed further in this report.

The following subsections provide specific discussions for special-status natural communities, plant and animal species, and habitats of concern (including critical habitat, jurisdictional aquatic resources, wildlife movement corridors, and regional and local habitat conservation plans).

Special-Status Natural Communities
The CNDDB search identified occurrences of five special-status natural communities within the nine-quad search area: central dune scrub, central foredune, coastal and valley freshwater, southern California threespine stickleback stream, and southern vernal pool. 2 None of these special-status
natural communities occur within the project site. The closest documented natural community, southern vernal pool is located west of the Santa Maria Airport approximately 3 miles south of the project site.

No special-status natural communities or conservation areas exist within the project site or in adjacent parcels. The project site is completely isolated and distant from all special-status natural communities that occur in the region.

Special-Status Plants
Based on the analysis and rationale provided in Attachment E, the project site is not expected to support any special-status plant species. The project site is extensively disturbed, developed, and 2 The CNDDB uses sensitive vegetation community names described in the Preliminary Descriptions of the Terrestrial Natural Communities of California (Holland 1986). No new sensitive natural community records have been added to the CNDDB since the 1990s. Therefore, natural communities mapped by the CNDDB are limited.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 7 routinely maintained due to WWTP operations and longstanding agricultural practices. Such anthropogenic disturbances have greatly altered the natural hydrologic regimes and have either eliminated or greatly impacted the pre-settlement habitats needed to support the special-status plant species identified in the CNDDB and CNPS queries. As such, the specific habitats, soil substrates, or “micro-climates” necessary for special-status plant species to occur are absent within the boundaries of the project site. Based on site observations coupled with the habitat suitability analysis, no special-status plant species are expected to occur within the project site. It is also unlikely that any source populations exist in adjacent or nearby parcels.

Special-Status Animals
Based on the analysis and rationale provided in Attachment E, nine special-status animal species have a potential to occur within the project site. These special-status animal species are discussed in further detail below:
• California tiger salamander (Ambystoma californiense) – Santa Barbara County Distinct Population Segment (DPS) pop. 2 – federally endangered and State listed as threatened • California red-legged frog (Rana draytonii) – federally threatened and CDFW Species of Special Concern
• Western spadefoot (Spea hammondii) – proposed as federally threatened and CDFW Species of Special Concern
• Southwestern pond turtle (Actinmys pallida) – proposed as federally threatened and CDFW Species of Special Concern
• Tricolored blackbird (Agelaius tricolor) – State listed as threatened • Northern California legless lizard (Anniella pulchra) – CDFW Species of Special Concern • Coast horned lizard (Phrynosoma blainvillii) – CDFW Species of Special Concern • Western burrowing owl (Athene cunicularia) – CDFW Species of Special Concern • Yellow warbler (Setophaga petechia) – CDFW Species of Special Concern Nesting birds are also afforded special protections under the California Fish and Game Code and Migratory Bird Treaty Act, and a discussion of nesting birds is included in this section.

Federally Listed Species
Of the species listed above, two are listed under the Federal Endangered Species Act (FESA), and two are proposed for listing as threatened. The species and components of critical/suitable habitat are discussed below.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 8 California tiger salamander. California tiger salamander (CTS) is listed as an endangered species under FESA and stated listed as threatened under CESA. The species is endemic to California and inhabits the Central Valley with small populations around Santa Barbara and Sonoma counties. CTS is found in low-elevation grassland-oak woodland communities of the valleys and foothills from near sea level up to 3,940 feet in elevation. Females lay eggs in vernal pools and other ephemeral aquatic features during November and February on submerged and emergent vegetation. Larvae transform during late spring or early summer, usually by the first week of July. Once a metamorph leaves its natal pond and enters a burrow, it will then spend the vast majority of its life underground in burrows made by other species. Adult CTS engage in mass migrations during a few rainy nights per year, typically from November through April, although migrating adults have been observed as early as October and as late as May. During these rain events, adults leave their underground burrows and return to breeding ponds to mate and will then return to their underground burrows. Several studies have shown that CTS can migrate up to 2 miles between breeding ponds and upland habitat.

There are nine CNDDB occurrences of CTS within 5 miles of the project site with the most recent record from 2014. The closest record is approximately 2.75 miles south of the project site from 2014 located at the Laguna Sewer District Wastewater Reclamation Plant at a known breeding pond. The other records occur around the Santa Maria Airport between 3 and 4 miles south of the project site.

While there are no known breeding ponds within 2 miles of the project site, there is the potential CTS could use the WWTP for aquatic habitat as adult CTS have been documented to use sewage treatment plants to breed (USFWS 2016). Additionally, Botta’s pocket gopher (Thomomys bottae) and California ground squirrel (Otospermophilus beecheyi) burrows were observed within the WWTP. The potential for CTS to occur within the project site, specifically the WWTP, is low due to the project site being outside of the dispersal range for CTS, regular disturbance, and the agricultural field would impede CTS migration. The irrigation ditches do not hold water long enough for CTS to breed and are routinely maintained, limiting suitable upland habitat. Other portions of the project site support agricultural row crops and do not contain aquatic or upland habitat to support CTS.

Nonetheless, occurrence cannot be ruled out and the project site, specifically the WWTP, could support breeding and upland habitat for CTS.

California Red-legged Frog. California red-legged frog (CRLF) is listed as a threatened species under FESA and is CDFW Species of Special Concern. This amphibian has declined in, or disappeared from, large portions of its former range in California (Stebbins 2003) but is still relatively common along the central coast of California, including portions of northern Santa Barbara County (USFWS 2002).

CRLF occurs in aquatic habitats such as creeks, ponds, and marshes. Suitable breeding habitat usually includes a minimum water depth of 10 to 20 inches and must contain water during the entire development period for eggs and tadpoles. Summer habitat may include upland areas and small mammal burrows close to a pond or a deep pool in a creek with emergent vegetation, undercut banks, or semi-submerged rootballs (USFWS 2005). CRLF enter a dormant state during summer or dry weather (estivate) in small mammal burrows and moist leaf litter. They have been found estivating up to 100 feet from water in adjacent dense riparian vegetation (USFWS 2017).

CRLF will disperse from their breeding habitat to forage and seek suitable upland and riparian habitat if aquatic habitat is not available (USFWS 2010). In one study referenced by the USFWS in the Final Rule for Designation of Critical Habitat for the California Red-Legged Frog, the majority of CRLF dispersed less than 1,640 feet away from breeding habitat, and the maximum dispersal 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 9 distance recorded was 1.7 miles (Fellers and Kleeman 2007, pp. 279–280). The study concluded that most CRLF move away from breeding sites, but only a few disperse farther than the nearest non-breeding habitat and that the distance moved is highly dependent on site conditions and local landscapes (Fellers and Kleeman 2007, p. 284). Movements of greater than 98 feet occurred mostly during winter rain events (Fellers and Kleeman 2007, p. 279). Other studies also suggest that CRLF dispersal distances from suitable breeding habitat are greatest during or following rain events.

During wet weather, CRLF often occurs in upland habitats near aquatic sites and can disperse widely over upland habitats during wet weather. For example, in Santa Cruz County, CRLF were documented to move through upland habitats for distances of over 2 miles, and these movements appear to be without regard to topographic features, vegetation communities, or riparian corridors (USFWS 2002).

There are 28 CNDDB occurrences of CRLF within 5 miles of the project site with most recent record from 2007. The closest record is located 0.24 mile northwest of the WWTP, and several other records are located between 0.4 and 1 mile from the project site within agricultural ponds. There are several agricultural ponds within the project site vicinity, and there are four agricultural ponds and an irrigated pasture located immediately east of the project site.

The WWTP ponds within the project site could provide marginal aquatic breeding, non-breeding, and dispersal habitat for CRLF. Small mammal burrows, those of Botta’s pocket gopher and California ground squirrel, were also observed within the portions of the WWTP that could potentially provide suitable upland sheltering habitat for CRLF.

At the time of the survey, the irrigation ditches did not contain water; however, there is potential for CRLF to use these ditches for dispersal and non-breeding aquatic habitat. These features lack the depth and hydroperiod required for breeding. The regular disturbance also reduces suitability within the irrigation ditches, but occurrence cannot be ruled out. Additionally, unknown small mammal burrows were observed along the margins of the eastern side of the project site adjacent to the agricultural ponds located outside of the project site boundary. This area could also provide upland sheltering habitat for CRLF. Due to the presence of suitable aquatic habitat and potentially suitable aquatic breeding habitats within the project vicinity, CRLF has a probability of occurring within the project site.

Western spadefoot. Western spadefoot is proposed for federal listing as threatened and listed as a CDFW Species of Special Concern. Western spadefoot ranges throughout the Central Valley and adjacent foothills. Western spadefoot inhabit areas ranging from near sea level to about 4,460 feet above mean sea level. This species occurs primarily in grasslands, but occasional populations also occur in valley-foothill hardwood woodlands. Some populations persist for a few years in orchard or vineyard habitats. Its prey base is comprised of insects, worms, algae, and other invertebrates.

Western spadefoots spend most of the year in underground burrows that either they construct themselves or are constructed by other mammal species. For breeding, the species uses temporary rain pools (vernal pools) that persist for more than three weeks. Tadpoles transform during late spring and disperse after spending a few hours or days near the pond margins.

There are 17 CNDDB occurrences of western spadefoot within 5 miles of the project site with the most recent record from 2010. There is one historic CNDDB occurrence of western spadefoot from 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 10 1923 that overlaps the project site, but the breeding habitat that the record refers to likely no longer exists. The closest record is approximately 2.3 miles north of the WWTP from 2007.

The WWTP may provide some breeding and upland dispersal habitat. The regular disturbance also reduces suitability within WWTP, but occurrence cannot be ruled out. The irrigation ditches could provide marginal breeding and dispersal habitat as western spadefoot have been documented to use irrigation ditches for breeding (Stebbins 2003). The upland habitat is highly disturbed from agriculture practices and reduces suitability, but occurrence cannot be ruled out. Overall, there is some potential for western spadefoot to use the irrigation ditches for breeding and/or dispersal.

Southwestern pond turtle. Southwestern pond turtle (SWPT) is proposed for federal listing as threatened and is listed as a CDFW Species of Special of Concern. SWPT is generalized in its habitat requirements, occurring in a broad range of aquatic water bodies including flowing rivers and streams, permanent lakes, ponds, reservoirs, settling ponds, marshes, and other wetlands. This species will also temporarily use semipermanent or ephemeral waterbodies, including stock ponds, vernal pools, and seasonal wetlands (Stebbins 2003, Germano and Bury 2009). This species is primarily aquatic; however, they typically leave aquatic habitats in the fall to reproduce and to overwinter (Jennings and Hayes 1994). Deep, still water with abundant emergent woody debris, overhanging vegetation, and rock outcrops is optimal for basking and thermoregulation. Although adults are habitat generalists, hatchlings and juveniles require shallow edgewater with relatively dense submergent or short emergent vegetation in which to forage. Eggs are deposited within excavated nests in upland areas, with substrates that typically have high clay or silt fractions (Jennings and Hayes 1994). When suitable nesting conditions are present, pond turtles typically lay approximately three to 11 eggs between March and August. The majority of nesting sites are located within 650 feet (200 meters) of aquatic sites; however, nests have been documented as far as 1,640 feet (500 meters) from aquatic habitat. Localized soil conditions and the frequency and degree of disturbance in the upland habitat limit their distribution. Soils need to be loose enough to allow nest excavation, while disturbance needs to be infrequent enough or of sufficiently low intensity that nests are not disturbed (Ernst and Lovich 2009). Furthermore, a study in the State of Washington found that urban, residential, and agricultural development of upland habitats within 325 feet (100 meters) of waterbodies effectively eliminated historical nesting areas (Holland and Bury 2004).

There is one CNDDB occurrence of SWPT located approximately 1.40 miles south of the project site from 1995. SWPTs are known to inhabit and thrive in sewage treatment facilities (Bury et al. 2012) and feed on human food waste (Germano and Riedle 2015, Germano 2016, Germano 2010).

Furthermore, a study conducted in the San Joaquin Valley documented 319 pond turtles breeding at two sewage-treatment facilities (Germano 2010). The WWTP ponds contain suitable breeding and upland habitat for SWPT. It is unlikely the irrigation ditches support SWPT due to the regular disturbance and lack of undisturbed upland habitat and aquatic habitat.

State Listed Species
Tricolored blackbird. Tricolored blackbird is State listed as threatened and colonial nesting sites are protected. This species is a resident of California and is found predominantly in the Central Valley and in coastal areas south of Sonoma County. Tricolored blackbirds primarily eat insects, seeds and cultivated grains in croplands, grassy fields, flooded land, and along edges of ponds. Tricolored 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 11 blackbird nests in dense cattails (Typha spp.) or tules (Schoenoplectus spp.), willows (Salix spp.), blackberry (Rubus spp.), wild rose (Rosa spp.), or tall herbs. Nests are located a few feet over or near fresh water. Breeding season occurs between mid-April through late July with a clutch size of three to four eggs. Tricolored blackbirds may raise two broods per year.

There are no CNDDB occurrences of tricolored blackbird in the project site or the vicinity. However, several eBird records have documented tricolored blackbird within the WWTP as recently as 2022 and as far back as 1991. Emergent vegetation is present along the perimeter of the some of the ponds within the WWTP and could provide suitable nesting and foraging habitat. The remainder of the project site does not contain suitable nesting habitat. However, the species may forage in and around these areas.

Non-Listed Special-Status Species
The following special-status species are not listed under the FESA or CESA, but have special-status designations, and impacts to these species warrant consideration under CEQA:

Northern California legless lizard. Northern California legless lizard is a CDFW Species of Special Concern. The range of this species is through the Coast Ranges in the vicinity of Antioch, Contra Costa County, south to the Mexican border. Northern California legless lizard usually forages at the base of shrubs or other vegetation either on the surface or just below it in leaf litter or sandy soil.

This species will also seek cover under surface objects such as flat boards and rocks where they lie barely covered in loose soil. They are often encountered buried in leaf litter and commonly burrow near the surface through loose soil. The reproductive season begins with mating activities in late spring or early summer. Live young are born in September, October, or even November. Legless lizard population densities have been reported associated with certain plant species that provide leaf litter and strong root structures attracting preferred prey and offering cover (Gallegos 2019).

Invasive ice plants (Carpobrotus edulis and Mesembryanthemum crystallinum) reduce soil moisture and the number of insects that inhabit the sand. They have no leaf litter and poor root structure, making the sand unsuitable for many herps, while outcompeting native plants that provide good microhabitats (Kuhnz et al. 2005, Jennings and Hayes 1994).

There are 15 CNDDB occurrences of northern California legless lizard within 5 miles of the project site with the most recent record from 2016. The closest record is approximately 0.27 mile south of the project site from 2010, and the remaining records are between 1.63 and 4 miles from the project site. CNDDB records of this species are associated with grassland habitats that contain native plants and sandy soils. The project site lacks native plants, contains ice plants, and has been heavily compacted due to agricultural practices and maintenance activities associated with WWTP. The site conditions reduce the suitability for northern California legless lizard. However, its presence cannot be completely ruled out.

Coast horned lizard. Coast horned lizard is a CDFW Species of Special Concern. It occurs in valley foothill hardwood, conifer and riparian habitats, as well as in pine-cypress, juniper, and annual grassland habitats. Its range extends through the Sierra Nevada foothills from Butte County to Kern County and throughout the central and southern California coast. Its elevational range extends up to 4,000 feet in the Sierra Nevada foothills and up to 6,000 feet in the mountains of southern 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 12 California. However, it is mainly found below 2,000 feet in the north and below 3,000 feet in the south. Coast horned lizards primarily eat ants and other insects like wasps, grasshoppers, and flies.

There are three CNDDB occurrences of coast horned lizard within 5 miles of the project site from 2008 and 2015. The closet record is approximately 3.98 miles northeast of the project site from 2008. The other two records are 4.5 miles east of the project site. Similar to the northern California legless lizard, the soils within the project site have been heavily compacted due to agricultural practices and maintenance activities associated with WWTP and lack native habitat, making it unlikely for this species to occur within the project site. However, its presence cannot be completely ruled out.

Western Burrowing Owl. Western burrowing owl is a CDFW Species of Special Concern. It is found in open, dry grasslands, agricultural and range lands, and desert habitats often associated with burrowing animals. Western burrowing owls nest in old ground squirrel, badger, or kit fox dens (i.e., burrows that are excavated by other species). These owls can be found at elevations ranging from 200 feet below sea level to 9,000 feet above mean sea level. Prey is primarily large arthropods as well as small mammals such as mice, rats, and gophers. The owls tend to perch on fence posts or on top of mounds outside their burrows. Western burrowing owls can migrate seasonally; the nesting season is typically between March and April. Burrowing owls have recently been documented within 5 miles of the project site.

There are two CNNDB occurrences of western burrowing owl within 5 miles of the project site from 2003 and 2009 located approximately 0.18 mile and 0.89 mile south of the project site, respectively.

Additionally, one eBird record has documented burrowing owl within the WWTP in 2010, and several other eBird records have been recorded in close proximity to project site. However, no sign that would indicate occupation or use by this species (e.g., scat, tracks, whitewash, prey remains, or any other sign) was identified during the field survey. Several small mammal burrows, including active California ground squirrel burrows, were observed within the WWTP. None of the small mammal burrows observed exhibited features typical of occupied burrowing owl burrows (e.g., whitewash and/or prey remains), although the species is highly mobile and there is some potential for future use of the project site by western burrowing owl. Western burrowing owl also may forage in and around the agricultural areas of the project site; however, the agricultural areas lack burrows and nesting habitat.

Yellow warbler. Yellow warbler is a CDFW Species of Special Concern. This species is found in riparian deciduous habitats such as cottonwoods, willows, alders, and other small trees and shrubs typical of low, open-canopy riparian woodland. It usually arrives in California in April and is mostly gone by October.

There are no CNDDB occurrences of yellow warbler within 5 miles of the project site. However, there are several eBird records documenting yellow warbler within the WWTP from 2020 and there are other records in the project vicinity. Emergent vegetation is present along the perimeter of some of the ponds within the WWTP and could provide suitable nesting and foraging habitat. The remainder of the project site does not contain suitable nesting habitat; however, the species may forage and in around the project site.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 13 Other Nesting Birds. Nesting birds are protected under the California Fish and Game Code and most native/migratory species are covered under the federal Migratory Bird Treaty Act. Construction activities that occur during the nesting bird season (typically February 1 through September 30) have the potential to result in the direct or indirect take of nesting birds. Several active nests were observed in the WWTP during the May 2024 survey and include barn swallow (Hirundo rustica), house finch (Haemorhous mexicanus), and American avocet (Recurvirostra americana).

Critical Habitat
The project site is not located within or adjacent to designated or proposed critical habitat for any species.

Aquatic Resources
There are several ponds associated with the WWTP as well as irrigation ditches within the project site as shown on Figure 3.

The WWTP ponds are artificially constructed and are regularly maintained and treated for wastewater management purposes. A majority of the ponds contained surface water at the time of the survey and do not contain any connection to other aquatic features. Under the current regulatory definition of Waters of the United States (WOTUS) and implementation guidance, the United States Army Corps of Engineers (USACE) does not assert Clean Water Act Section 404 jurisdiction over active wastewater treatment facilities, or features that lack a significant nexus with traditional navigable waters. In addition, the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material of Waters of the State (State Water Resources Control Board [SWRCB] 2019) states that industrial or municipal wastewater treatment or disposal features are not considered jurisdictional waters of the State. Isolated wastewater treatment ponds are also not considered “streams, lakes, or rivers” subject to regulation under Section 1602 of the California Fish and Game Code. As such, the active wastewater treatment ponds within the WWTP are not considered to be jurisdictional aquatic resources under the aforementioned regulations.

Several of the irrigation ditches are located along the roadsides of both Stowell Road and Black Road, and one is located within the WWTP. These ditches carry stormwater and agricultural runoff within the project site and adjacent agricultural properties. Based on analysis of aerial imagery, the ditches do not have any connection to other aquatic features. Most of the ditches were either barren with a sandy bottom or contained ruderal vegetation lining the bottom/banks. Commonly observed species include short pod mustard, lamb’s quarter, Canadian horseweed, and other annual grasses. Ditches (including roadside ditches) excavated wholly in uplands and draining only uplands are not typically considered WOTUS by the USACE. The existing drainage ditches do not have a defined bed and bank, are regularly disturbed by agricultural practices, and provide little to no habitat value to wildlife. These ditches would not be considered jurisdictional by the CDFW as they are isolated features; do not likely meet the California Fish and Game Code definitions of a “stream,” “river,” or “lake;” and lack a defined bed/bank. However, the irrigation ditches could potentially be subject to the jurisdiction of the Regional Water Quality Control Board (RWQCB) as waters of the State under the Porter-Cologne Water Quality Control Act (Porter-Cologne Act) because these features convey ephemeral surface flows. Potential RWQCB jurisdiction under the Porter-Cologne 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 14 Act is broad, including “any surface water or groundwater, including saline waters, within the boundaries of the state” (Water Code section 13050(e)).

Wildlife Movement and Habitat Connectivity
Movement corridors may provide favorable locations for wildlife to travel between different habitat areas such as foraging sites, breeding sites, cover areas, and preferred summer and winter range locations. They may also function as dispersal corridors allowing animals to move between various locations within their range.

The project site is primarily developed and subjected to longstanding anthropogenic disturbances that would limit wildlife movement within the project site. Additionally, the project site is surrounded by converted lands used for residential uses, roads, recreation, and commercial uses and the project site has no connection to natural habitats, further limiting wildlife movement through the project site. However, migratory bird species may utilize the project site for transient migration or foraging and would be limited to species that forage over developed areas. The project site does not possess any characteristics that would indicate a locally significant stopover point for migratory species including raptors or waterfowl. However, several common and special-status species are known to move throughout lands in the general vicinity.

Regional Habitat Conservation Plans and Local Policies
The City of Santa Maria and the County of Santa Barbara currently do not have an adopted regional Natural Community Conservation Plan or Habitat Conservation Plan. The 2010 General Plan for the City of Santa Maria outlines local relevant policies related to biological resources applicable to the project.

CITY OF SANTA MARIA GENERAL PLAN
POLICY 3. Protect and preserve biological resources and expand the urban forest within the Planning Area in order to enhance the quality of life in the Santa Maria Valley.

Furthermore, no protected trees are located within the project site (City of Santa Maria 2016).

CONCLUSION
The proposed project does not have a site plan depicting ground disturbance activities within the project site. At this time, the impact analysis and recommended mitigation measures will be completed once a site plan is finalized and would then be used to support the CEQA review process.

Based on field observations coupled with the habitat suitability analysis conducted for this memorandum, the project site has potential to support nine special-status animal species and nesting birds within the project site due to the presence of suitable habitat. No special-status plants are expected to occur due to the extensive disturbances, developments, and maintenance associated with the WWTP and agricultural practices. Additionally, the project site does not support any sensitive natural communities. Furthermore, the active wastewater treatment ponds within the 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 15 WWTP are not considered to be jurisdictional aquatic resources under the current regulations. The irrigation ditches would also not be regulated by CDFW and USACE as jurisdictional features because they do not meet the current regulatory definitions. However, the irrigation ditches could potentially be subject to the jurisdiction of the RWQCB as waters of the State under the Porter-Cologne Act because these features convey ephemeral surface flows. The project site does not contain any critical habitat or wildlife movement corridors.

If you have any questions regarding this memorandum, please contact Kelly McDonald at (805) 324-6836.

Attachments: A: References
B: Figures
C: Representative Site Photographs
D: Vascular Plant and Animal Species Observed
E: Summary of Special-Status Species
A-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT A

REFERENCES
Baldwin, B.G., D.H. Goldman, D.J. Keil, R. Patterson, T.J. Rosatti, and D.H. Wilken, editors. 2012. The Jepson Manual: Vascular Plants of California, Second Edition. University of California Press, Berkeley.

Bury, R,B, H.H. Welsh, Jr., D.J. Germano, and D.T. Ashton. 2012. Western pond turtle: Biology, sampling techniques, inventory and monitoring, conservation, and management. Northwest Fauna 7. The Society for Northwestern Vertebrate Biology.

California Department of Fish and Wildlife (CDFW). 2024a. California Natural Diversity Data Base (CNDDB). Special Animals List. January 2024. Periodic publication. 67 pp. ______. 2024b. State of California, Department of Fish and Wildlife Biogeographic Data Branch.

California Natural Diversity Database (CNDDB). Rarefind Version 5. July 2021. Rarefind query of the USGS 7.5-minute quads seven-quad review area – Oceano, Nipomo, Huasna Peak, Guadalupe, Santa Maria, Twitchell Dam, Casmalia, Orcutt, and Sisquoc and GIS query of occurrences within a 5-mile buffer (project vicinity).

California Native Plant Society (CNPS). 2024. Inventory of Rare and Endangered Plants (online edition v8). Website: http://cnps.org/cnps/rareplants/inventory/ (accessed May 2024).

City of Santa Maria. 2011. City of Santa Maria General Plan. Website: https://www.cityofsantamaria. org/citygovernment/ departments/community-development/planning-division/planning-policies-andregulations/ general-plan (accessed May 2024). ______. 2016. Santa Maria Municipal Code. Website: http://www.qcode.us/codes/santamaria/ (accessed May 2024).

Crother, B.I., ed. 2012. Scientific and Standard English Names of Amphibians and Reptiles of North America North of Mexico. Society for the Study of Amphibians and Reptiles (SSAR) Herpetological Circular 39. Website: http://ssarherps.org/wp-content/uploads/2014/07/ HC_39_7thEd.pdf (accessed June 2024).
eBird. 2024. eBird: An online database of bird distribution and abundance. eBird, Cornell Lab of Ornithology, Ithaca, New York. Website: http://www.ebird.org (accessed May 2024).

Ernst, C.H., Lovich, J.E. 2009. Turtles of the United States and Canada. 2nd Edition. Baltimore: Johns Hopkins University Press.

Fellers, G.M. and P.M. Kleeman. 2007. California Red-Legged Frog (Rana draytonii) Movement and Habitat Use: Implications for Conservation. Journal of Herpetology, Vol. 41, No. 2, pp. 276286, 2007.

A-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Gallegos, M.A. 2019. Habitat Preference and Distribution of the Northern California Legless Lizard (Anniella pulchra) in Eastern Contra Costa County. U.C. Berkeley.

Germano, D.J. 2010. Ecology of Western Pond Turtles (Actinemys marmorata) at Sewage Treatment Facilities in the San Joaquin Valley, California. The Southwestern Naturalist 55(1): 89–97. (accessed June 2024).
______. 2016. The Ecology of a Robust Population of Actinemys marmorata in the San Joaquin Desert of California. Copeia 104(3): 663–676. (accessed June 2024).

Germano, D.J., and J.D. Riedle. 2015. Population Structure, Growth, Survivorship, and Reproduction of Actinemys marmorata from a High Elevation Site in the Tehachapi Mountains, California.

Herpetologica 71(2): 102–109.

Germano, D.J., and R.B. Bury. 2009. Variation in body size, growth, and population structure of Actinemys marmorata from lentic and lotic habitats in southern Oregon. Journal of Herpetology 43:510–520.

Google LLC. 2024. Google Earth Pro.

Holland. 1986. California Department of Fish and Game: Preliminary Descriptions of the Terrestrial Natural Communities of California.

Holland, D.C., and R.B. Bury. 2004. Clemmys marmorata (Baird and Girard 1852) western pond turtle. In P.C. H. Pritchard and A. G. J Rhodin (eds.), The conservation biology of freshwater turtles. Chelonian Research Monographs 2(2).

Jennings, M.R., and M.P. Hayes. 1994. Amphibian and reptile species of special concern in California.

Final Report to the California Department of Fish and Game, Inland Fisheries Division, Rancho Cordova, California.

Kuhnz, L.A., R.K. Burton, P.N. Slattery, and J.M. Oakden. 2005. Microhabitats and population densities of California legless lizards, with comments on effectiveness of various techniques for estimating numbers of fossorial reptiles. Journal of Herpetology 39(3):395-402 Natural Resource Conservation Service (NRCS). 2024. Web Soil Survey. Website http://websoil survey.nrcs.usda.gov/app/WebSoilSurvey.aspx (accessed June 2024).

Rincon Consultants, Inc. 2006. Santa Maria Wastewater Treatment Plant Expansion Final Environmental Impact Report.

Sawyer, J., T. Keeler-Wolf, and J. Evans. 2009. A Manual of California Vegetation. 2nd edition.

California Native Plant Society. Sacramento, California: California Native Plant Society. 1,300 pp.

SWCA Environmental Consultants. 2023. Stowell/Black Road Waterline Extension Initial Study Report. April.

A-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) State Water Resources Control Board (SWRCB). 2019. State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State [For Inclusion in the Water Quality Control Plans for Inland Surface Waters and Enclosed Bays and Estuaries and Ocean Waters of California]. Adopted April 2, 2019. Effective May 28, 2020. Website: https://www. waterboards.ca.gov/water_issues/programs/cwa401/docs/2021/procedures.pdf (accessed June 2024).

Stebbins, R.C. 2003. A Field Guide to Western Reptiles and Amphibians. Third Edition. Boston:

Houghton Mifflin Company.

United States Environmental Protection Agency (USEPA) and Department of the Army (DOA). 2020.

The Navigable Waters Protection Rule: Definition of “Waters of the United States.” 85 Federal Register 22250. Website: https://www.federalregister.gov/documents/2020/04/21/ 2020-02500/the-navigable-waters-protection-rule-definition-of-waters-of-the-united-states (accessed June 2024).

United States Fish and Wildlife Service (USFWS). 2002. Recovery Plan for the California Red-legged Frog (Rana aurora draytonii). Portland, Oregon.
______. 2005. USFWS Revised Guidance on Site Assessments and Field Surveys for the California Red-legged Frog. Sacramento, CA.
______. 2010. Revised Designation of Critical Habitat for the California Red-legged Frog Final Rule.

Federal Register 7 (1): 12816-12959.
______. 2015. Draft recovery plan for the Santa Barbara County Distinct Population Segment of the California tiger salamander (Ambystoma californiense). U.S. Fish and Wildlife Service, Pacific Southwest Region, Ventura, California. vi + 76 pp
______. 2015. USFWS Critical Habitat Mapper. Website: http://ecos.fws.gov/crithab/ (accessed June 2023).
______. 2016. Recovery Plan for the Central California Distinct Population Segment of the California Tiger Salamander (Ambystoma californiense). U.S. Fish and Wildlife Service, Pacific Southwest Region, Sacramento, California. v + 69pp.
______. 2017. Species Information. California Red-Legged Frog (Rana draytonii). Sacramento Fish & Wildlife Office. Updated December 20, 2017. Website: https://www.fws.gov/species/ california-red-legged-frog-rana-draytonii (accessed June 2024). ______. 2024a. Environmental Conservation Online System (ECOS). Information for Planning and Conservation (IPaC) Trust Resources Report. Website: http://ecos.fws.gov/ecp/ (accessed June 2024).
______. 2024b. USFWS Critical Habitat Polygons. Website: http://ecos.fws.gov/crithab/ (accessed May 2024).
______. 2024c. USFWS National Wetlands Inventory (NWI), Online Mapper Tool. Website:
https://www.fws.gov/wetlands/data/mapper.html (accessed June 2024).

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT B

FIGURES
Figure 1: Regional Location Map
Figure 2: Project Site
Figure 3: Vegetation
Figure 4: Soils
SOURCE: USGS The National Map (2018)
I:\20241463\GIS\Pro\Santa Maria WWTP Project\Santa Maria WWTP Project.aprx (4/30/2024) FIGURE 1
Santa Maria Wastewater Treatment
Plant Improvements Project

S A N L U I S

O B I S P O

C O U N T Y

S A N T A

B A R B A R A

C O U N T Y
£¤101
Ã1
Ã227
Ã135 Ã166
Project Vicinity
0 1000 2000
FEET
Project Location
Regional Location Map
Black Rd
Ray Rd
W Stowell Rd
Main St
E St
Prandini Way
Unnam
e
d Farm Rd
Bonita School Rd
SOURCE: Nearmap (6/2023)
I:\20241463\GIS\Pro\Santa Maria WWTP Project\Santa Maria WWTP Project.aprx (4/30/2024) FIGURE 2
Santa Maria Wastewater Treatment
Plant Improvements Project 0 750 1500
FEET
Project Site
Project Site

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT C

REPRESENTATIVE SITE PHOTOS
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Attachment C
Representative Site Photos
Santa Maria Wastewater Treatment Project

1. View of the developed area facing northwest. May 9, 2024. 2. View of the disturbed/ruderal area facing east. May 9, 2024.

3. View of agricultural- row crop area facing southwest. May 9, 2024.

4. View of irrigation ditch facing east. May 9, 2024.

Page 1 of 4 ends

I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

5. View of irrigation ditch facing east. May 9, 2024. 6. View of irrigation ditch facing east. May 9, 2024.

7. View of agricultural- row crop area facing west. May 9, 2024.

8. View of irrigation ditch facing west. May 9, 2024.

Page 2 of 4 ends

Attachment C
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

9. View of irrigation facing north. May 9, 2024. 10. View of developed area within WWTP, facing northeast.

May 9, 2024.

11. View of ponds within WWTP facing west. May 9, 2024. 12. View of active barn swallow nest on WWTP structures.

May 9, 2024.

Page 3 of 4 ends

Attachment C
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

13. View of developed area within WWTP facing north. May 9, 2024.

14. View of active California ground squirrel burrow. May 9, 2024.

Page 4 of 4 ends

Attachment C
D-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT D

VASCULAR PLANT AND ANIMAL SPECIES OBSERVED
The following plant species were observed in the specified survey area by LSA biologist Kelly McDonald during the survey conducted on May 9, 2024.
* introduced species not native to California
Vascular Plant Species Observed

EUDICOTS
Apiaceae Carrot Family
* Conium maculatum Poison hemlock
Amaranthaceae Amaranth Family
* Chenopodium album Lamb’s quarter
* Chenopodiastrum murale Nettle-leaved goosefoot
Asteraceae Sunflower Family
Baccharis pilularis Coyote bush
* Carduus pycnocephalus Italian thistle
Erigeron canadensis Common horseweed
* Helminthotheca echioides Bristly oxtongue
Heterotheca grandiflora Telegraphweed
Matricaria discoidea Pineapple weed
* Senecio vulgaris Common groundsel
* Sonchus arvensis Sow thistle
Aizoaceae Iceplant Family
* Carpobrotus edulis Iceplant
Boraginaceae Borage Family
Amsinckia intermedia Common fiddleneck
Brassicaceae Mustard Family
* Brassica nigra Black mustard
* Capsella bursa-pastoris Shepherd’s purse
* Coronopus didymus Lesser swine-cress
* Hirschfeldia incana Short pod mustard
* Raphanus raphanistrum Wild radish
* Sisymbrium irio London rocket
Caryophyllaceae Pink Family
* Stellaria media Common chickweed
Fabaceae Legume Family
* Medicago polymorpha Burr clover
* Melilotus indicus Yellow sweetclover
* Trifolium hirtum Rose clover
Fagaceae Oak Family
Quercus agrifolia Coast live oak
D-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Vascular Plant Species Observed
Frankeniaceae Frankenia Family
Frankenia salina Alkali heath
Geraniaceae Geranium Family
* Erodium botrys Big heron bill
Malvaceae Mallow Family
* Malva parviflora Cheesweed mallow
Myrsinaceae Myrsine Family
* Lysimachia arvensis Scarlet pimpernel
Onagraceae Evening Primrose Family
Camissonia strigulosa Sandysoil suncup
Enothera biennis Common evening primrose
Papaveraceae Poppy Family
Eschscholzia californica California poppy
Plantaginaceae Plantain Family
* Plantago lanceolata English plantain
Polygonaceae Buckwheat Family
* Rumex crispus Curly dock
Salicaceae Willow Family
Salix laevigata Red willow
Salix exigua Narrowleaf willow
Solanaceae Nightshade Family
* Nicotiana glauca Tree tobacco
Urticaceae Nettle Family
* Urtica urens Dwarf nettle

MONOCOTS
Cyperaceae Sedge Family
Schoenoplectus californicus California bulrush
Poaceae Grass Family
* Avena fauta Wild oats
Bromus madritensis Red brome
* Cynodon dactylon Bermuda grass
* Bromus diandrus Ripgut brome
* Ehrharta calycina Perennial veldt grass
* Hordeum murinum Mouse barley
* Festuca myuros Rattail sixweeks grass
* Festuca perennis Italian rye grass
* Lamarckia aurea Goldentop grass
* Polypogon monspeliensis Rabbitsfoot grass
* Schismus arabicus Mediterranean grass
Sorghum halepense Johnson grass
* Triticum aestivum Common wheat
D-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) The following animal species were observed in the specified survey area by LSA biologist Kelly McDonald during the survey conducted on May 9, 2024.
* introduced species not native to California
Animal Species Observed

REPTILIA REPTILES
Phrynosomatidae Phrynosomatid Lizards
Sceloporus occidentalis Western fence lizard
Colubridae Colubrid Snakes
Pituophis catenifer Gophersnake

AVES BIRDS
Anatidae Ducks, Geese, and Swans
Anas platyrhynchos Mallard
Oxyura jamaicensis Ruddy duck
Rallidae Rails, Gallinules, and Coots
Fulica americana American coot
Recurvirostridae Stilts and Avocets
Himantopus mexicanus Black-necked stilt
Recurvirostra americana American avocet
Charadriidae Plovers and Lapwings
Charadrius vociferus Killdeer
Scolopacidae Sandpipers
Tringa flavipes Lesser yellowlegs
Columbidae Pigeons and Doves
Zenaida macroura Mourning dove
Trochilidae Hummingbirds
Calypte anna Anna’s hummingbird
Tyrannidae Tyrant Flycatchers
Sayornis nigricans Black phoebe
Cathartidae New World Vultures
Cathartes aura Turkey vulture
Accipitridae Hawks, Kites, Eagles, and Allies
Buteo jamaicensis Red-tailed hawk
Falconidae Caracaras and Falcons
Falco sparverius American kestrel
Corvidae Crows and Jays
Corvus brachyrhynchos American crow
Alaudidae Larks
Eremophila alpestris Horned lark
Hirundinidae Swallows
Hirundo rustica Barn swallow
Petrochelidon pyrrhonota Cliff swallow
D-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Animal Species Observed
Mimidae Mockingbirds and Thrashers
Mimus polyglottos Northern mockingbird
Sturnidae Starlings
* Sturnus vulgaris European starling
Passeridae Old World Sparrows
* Passer domesticus House sparrow
Fringillidae Fringilline and Cardueline Finches and Allies Haemorhous mexicanus House finch
Passerellidae New World Sparrows
Melospiza melodia Song sparrow
Icteridae Blackbirds
Agelaius phoeniceus Red-winged blackbird
Euphagus cyanocephalus Brewer’s blackbird
Quiscalus mexicanus Great-tailed grackle
Parulidae Wood Warblers
Leiothlypis celata Orange-crowned warbler
Geothlypis trichas Common yellowthroat

MAMMALIA MAMMALS
Geomyidae Pocket Gophers
Thomomys bottae Botta’s pocket gopher
Sciuridae Squirrels, Chipmunks, and Marmots
Otospermophilus beecheyi California ground squirrel

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT E

SUMMARY OF SPECIAL-STATUS SPECIES
E-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Hoover’s
bentgrass
Agrostis hooveri US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in mostly sandy
soil within chaparral, closed-cone coniferous
forest, cismontane woodland and
valley/foothill grassland between 6 and 610
m in elevation. Found in San Luis Obispo and
Santa Barbara counties.

April–July Not expected. There is one known record of
occurrence in the project vicinity 1 (CNDDB
2013). The project site does not contain
chaparral, closed-cone coniferous forest,
cismontane woodland and valley/foothill
grassland habitats.

Aphanisma Aphanisma blitoides US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal bluff scrub,
coastal dunes and coastal scrub in
sometimes gravelly and sandy soils between
1 and 305 m in elevation. Found in Los
Angeles, Orange, San Diego, Santa Barbara
and Ventura counties.

February–June Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, coastal dunes and coastal scrub are
absent.

Santa
Margarita
manzanita
Arctostaphylos
pilosula
US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub occurring in
Broadleafed upland forest, Chaparral,
Cismontane woodland, and Closed-cone
coniferous forest between 75 and 1,100 m
in elevation. San Luis Obispo County.

December-May Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, coastal dunes and coastal scrub are
absent. This perennial species was not
observed within the project site.

La Purisima
manzanita
Arctostaphylos
purissima
US: –
CA: –
CNPS: 1B.1
Perennial evergreen shrub found in coastal
scrub and sandy chaparral between 60 and
390 m in elevation. Santa Barbara County.

November–May Not expected. There are no known records of occurrence in project vicinity and coastal
scrub and sandy chaparral are absent. This
perennial species was not observed within
the project site.

Refugio
manzanita
Arctostaphylos
refugioensis
US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub found in
chaparral (sandstone) between 274 and 820
m in elevation. Santa Barbara County.
(May)December–
March
Not expected. There are no known records of
occurrence in project vicinity and chaparral
(sandstone) is absent. This perennial species
was not observed within the project site.

Sand mesa
manzanita
Arctostaphylos rudis US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub occurring in
maritime, sandy chaparral between 25 and
322 m. Santa Barbara County.

November–
February
Not expected. There are no known records of
occurrence in project vicinity and maritime,
sandy chaparral is absent. This perennial
species was not observed within the project
site.

Marsh
sandword
Arenaria paludicola US: FE
CA: CE
CNPS: 1B.1
Perennial stoloniferous herb occurring in
marshes and swamps (brackish freshwater)
between 3 and 170 m in elevation. Found in
Los Angeles, Marin, Riverside and San Luis
Obispo counties.

May–August Not expected. There are no known records of
occurrence in project vicinity and marshes
and swamps (brackish freshwater) habitat is
absent.

E-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Mile’s milk-vetchAstragalus
didymocarpus var.
milesianus
US: –
CA: –
CNPS: 1B.2
Annual herb found in coastal scrub on clay
soils between 20 and 90 m in elevation.

Found in San Luis Obispo, Santa Barbara and
Ventura County.

March–June Not expected. There are no known records of
occurrence in project vicinity and coastal
scrub habitat is absent.

San Luis Obispo
owl's-clover
Castilleja densiflora
var. obispoensis
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in meadows/seeps
and valley/foothill grassland between 10
and 430 m in elevation. San Luis Obispo
County.

March-May Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

Santa Barbara
ceanothus
Ceanothus
impressus
var. impressus
US: –
CA: –
CNPS: 1B.2
Perennial shrub occurring in chaparral,
sandy soils between 40 and 470 m in
elevation. Santa Barbara County.

February- April Not expected. There are no known records of occurrence in project vicinity and suitable
habitat is absent.

Nipomo Mesa
ceanothus
Ceanothus
impressus var.
nipomensis
US: –
CA: –
CNPS: 1B.2
Perennial shrub occurring in chaparral,
sandy soils between 30 and 245 m in
elevation. Santa Barbara and San Luis
Obispo counties.

February- April Not expected. There is one known record of occurrence in the project vicinity (CNDDB
1974) and chaparral habitat is absent.

Coastal
goosefoot
Chenopodium
littoreum
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes
between 10 and 30 m in elevation. Found in
Los Angeles, San Luis Obispo and Santa
Barbara counties.

April-August Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

Bolander's
water-hemlock
Cicuta maculata
var. bolanderi
US: –
CA: –
CNPS: 2B.2
Perennial herb occurring in marshes and
swamps (brackish, coastal, freshwater)
between 0 and 200 m in elevation. Found in
Contra Costa, Marin, Sacramento, Santa
Barbara and Solano counties.

July-September Not expected. There are no known records of occurrence in project vicinity and marsh
habitat is absent.

Surf thistle Cirsium
rhothophilum
US: –
CA: CT
CNPS: 1B.2
Perennial herb occurring in coastal bluff
scrub and coastal dunes between 3 and 60
m in elevation. Santa Barbara and San Luis
Obispo counties.

April-June Not expected. There are no known records of
occurrence in project vicinity and coastal bluff
scrub and coastal dunes habitat is absent.

La Graciosa
thistle
Cirsium scariosum
var.
loncholepis
US: FE
CA: CT
CNPS: 1B.1
Perennial herb occurring in mesic, sandy
cismontane woodland, coastal dunes,
coastal scrub, marshes, swamps (brackish),
and valley/foothill grassland between 4 and
220 m in elevation. Santa Barbara and San
Luis Obispo counties.

May–August Not expected. There are three known records
of occurrence in the project vicinity (CNDDB
1983, 1990, 1991) and cismontane woodland,
coastal dunes, coastal scrub, marshes,
swamps (brackish), and valley/foothill
grassland habitats are absent.

E-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
California saw-grassCladium
californicum
US: –
CA: –
CNPS: 2B.2
Perennial rhizomatous herb occurring in
meadows, seeps, marshes and swamps
(alkaline, freshwater) between 60 and 1,600
m in elevation. Found in Southern California
counties.

June–September Not expected. There are no known records of occurrence in project vicinity and meadows,
seeps, marshes and swamps habitat is absent.

Pismo clarkia Clarkia speciosa ssp.
immaculata
US: FE
CA: CR
CNPS: 1B.1
Annual herb occurring in chaparral (margins,
openings), cismontane woodland, and
valley/foothill grassland between 25 and
185 in elevation. San Luis Obispo County.

May-July Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

Seaside bird's-beakCordylanthus
rigidus
ssp.
littoralis
US: –
CA: CE
CNPS: 1B.1
Annual herb (hemiparasitic) occurring in
closed-cone coniferous forest, maritime
chaparral, cismontane woodland, coastal
dunes, and coastal scrub between 0 and 515
m in elevation. Monterey and Santa Barbara
County.

April–October Not expected. There are no known records of occurrence in project vicinity and closed-cone
coniferous forest, maritime chaparral,
cismontane woodland, coastal dunes, and
coastal scrub habitat is absent.

Gaviota
tarplant
Deinandra
increscens
ssp.
villosa
US: FE
CA: CE
CNPS: 1B.2
Annual herb occurring in coastal bluff scrub,
coastal scrub and valley/foothill grassland
between 20 and 430 m in elevation. Santa
Barbara County.

May–October Not expected. There are no known records of occurrence in project vicinity and suitable
habitat is absent.

Dune larkspur Delphinium parryi
ssp.
blochmaniae
US: –
CA: –
CNPS: 1B.2
Perennial herb occurring maritime chaparral
and coastal dunes between 0 and 200 m in
elevation. Found in Santa Barbara, San Luis
Obispo and Ventura counties.

April–June Not expected. There is one historical record of occurrence in the project vicinity (CNDDB
1943) and maritime chaparral and coastal
dunes habitat is absent.

Beach
spectaclepod
Dithyrea maritima US: –
CA: CT
CNPS: 1B.1
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrubs (sandy)
between 3 and 50 m in elevation. Found in
San Luis Obispo, Santa Barbara and Ventura
counties.

March–May Not expected. There are no known records of
occurrence in project vicinity and coastal
dunes and coastal scrubs habitat is absent.

Blochman’s
dudleya
Dudleya
blochmaniae ssp.
blochmaniae
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in coastal bluff
scrub, chaparral, coastal scrub and
valley/foothill grassland in often clay, rocky
and serpentinite soil between 5 and 450 m
in elevation. Found in Santa Barbara, San
Luis Obispo, Ventura, Orange, Los Angeles,
and San Diego counties.

April–June Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent. The project site does not
contain suitable soil types for this species.

E-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Blochman's
leafy daisy
Erigeron
blochmaniae
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 3
and 45 m in elevation. Found in San Luis
Obispo and Santa Barbara counties.

June–August Not expected. There is one known record of
occurrence in project vicinity (CNDDB 1991)
and coastal dunes and coastal scrub habitat is
absent.

Lompoc yerba
santa
Eriodictyon
capitatum
US: FE
CA: CR
CNPS: 1B.2
Perennial evergreen shrub occurring in
coastal bluff scrub, closed-cone coniferous
forest, and maritime chaparral between 40
and 900 m in elevation. Santa Barbara
County.

May–September Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, closed-cone coniferous forest, and
maritime chaparral habitat is absent.

Mesa horkelia Horkelia cuneata
var. puberula
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in chaparral,
cismontane woodland, and coastal scrub on
sandy or gravelly soils between 70 and 810
m in elevation. Found in Central Coast and
Southern California counties.

February–July Not expected. There are no known records of occurrence in project vicinity and chaparral,
cismontane woodland, and coastal scrub
habitat is absent.

Kellogg's
horkelia
Horkelia cuneata
var. sericea
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in closed-cone
coniferous forest, maritime chaparral,
coastal dunes, and coastal scrub between
10 and 200 m in elevation. Found in Central
Coast and Bay Area counties.

April–September Not expected. There are no known records of occurrence in project vicinity and closed-cone
coniferous forest, maritime chaparral, coastal
dunes, and coastal scrub habitat is absent.

Beach layia Layia carnosa US: FE
CA: CE
CNPS: 1B.1
Annual herb occurring in coastal dunes and
coastal scrub (sandy) between 0 and 60 m in
elevation. Found in Santa Barbara, San
Francisco, Monterey, Marin, and Humboldt
counties.

March–July Not expected. There are no known records of
occurrence in project vicinity and coastal
dunes and coastal scrub habitat is absent.

Blushing layia Layia erubescens US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes and
coastal scrub between 10 and 245 m in
elevation. Santa Barbara and San Luis
Obispo County.

March-May Not expected. There is one historical record
of occurrence in project vicinity (CNDDB
1937) and coastal dunes and coastal scrub
habitat is absent.

Pale-yellow
layia
Layia heterotricha US: –
CA: –
CNPS: 1B.1
Annual herb occurring in cismontane
woodland, coastal scrub, pinyon/juniper
woodland, and valley/foothill grassland
between 300 and 1,705 m in elevation.

Found in Fresno, Monterey, San Benito,
Santa Barbara and Ventura counties.

March–June Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

San Luis Obispo
County lupine
Lupinus
ludovicianus
US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in chapparal and
cismontane woodland between 50 and 525
m in elevation. San Luis Obispo County.

April-July Not expected. There are no known records of
occurrence in project vicinity and chapparal
and cismontane woodland habitat is absent.

E-5

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Nipomo Mesa
lupine
Lupinus nipomensis US: FE
CA: CE
CNPS: 1B.1
Annual herb occurring in coastal dunes
between 10 and 50 m in elevation. San Luis
Obispo County.

December-May Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

Slender
bushmallow
Malacothamnus
jonesii var. gracilis
US: –
CA: –
CNPS: 1B.1
Perennial deciduous shrub occurring in
chaparral between 190 and 575 m in
elevation. San Luis Obispo and Santa
Barbara County.

May-October Not expected. There are no known records of occurrence in project vicinity and chaparral
habitat is absent.

Southern curly-leaved
monardella
Monardella sinuata
ssp.
sinuata
US: –
CA: –
CNPS: 1B.1
Annual herb occurring in chaparral, coastal
dunes, coastal scrub openings, and
cismontane woodland between 0 and 300 m
in elevation. San Luis Obispo and Santa
Barbara counites.

April–September Not expected. There are no known records of occurrence in project vicinity and chaparral,
coastal dunes, coastal scrub openings, and
cismontane woodland habitat is absent.

Crisp
monardella
Monardella
undulata ssp. crispa
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 10
and 120 m in elevation. Found in San Luis
Obispo and Santa Barbara counites.

April–August Not expected. There are no known records of occurrence in project vicinity and coastal
dunes and coastal scrub habitat is absent.

San Luis Obispo
monardella
Monardella
undulata ssp.
undulata
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 10
and 200 m in elevation. Found in San Luis
Obispo and Santa Barbara counites.

May–September Not expected. There are two known records of occurrence in the project vicinity (CNDDB
1979) and coastal dunes and coastal scrub
habitat is absent.

Aparejo grass Muhlenbergia utilis US: –
CA: –
CNPS: 2B.2
Perennial rhizomatous herb occurring in
chaparral, coastal scrub, meadows, seeps,
marches/swamps, and cismontane
woodland between 25 and 2,325 m in
elevation. Found in Central Coast and
Central Valley counties.

March–October Not expected. There are no known records of occurrence in project vicinity and chaparral,
coastal scrub, meadows, seeps,
marches/swamps, and cismontane woodland
habitat is absent.

Gambel's water
cress
Nasturtium
gambelii
US: FE
CA: CT
CNPS: 1B.1
Perennial rhizomatous herb occurring in
marshes and swamps (brackish, freshwater)
between 5 and 330 m in elevation. Found in
Santa Barbara, San Luis Obispo, Los Angeles
and Orange counties.

April–October Not expected. There are no known records of occurrence in project vicinity and marshes
and swamps habitat is absent.

Coast woolly-headsNemacaulis
denudata var.
denudate
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes
between 0 and 100 m in elevation. Found in
Los Angeles, Orange, San Diego, and San
Luis Obispo counties.

April-September Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

E-6

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Black-flowered
figwort
Scrophularia atrata US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in chaparral,
closed-cone coniferous forest, coastal scrub,
coastal dunes, and riparian scrub between
10 and 500 m in elevation. San Luis Obispo
and Santa Barbara counites.

March–July Not expected. There are no known records of
occurrence in project vicinity and chaparral,
closed-cone coniferous forest, coastal scrub,
coastal dunes, and riparian scrub habitat is
absent.

San Bernardino
aster
Symphyotrichum
defoliatum
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
cismontane woodland, coastal scrub, lower
montane coniferous forest, meadows,
seeps, marshes and swamps and
valley/foothill grassland (vernally mesic)
between 2 and 2,040 m in elevation. Found
in Southern California counties.

July–November Not expected. There are no known records of occurrence in project vicinity and cismontane
woodland, coastal scrub, lower montane
coniferous forest, meadows, seeps, marshes
and swamps and valley/foothill grassland
(vernally mesic) is absent.
1 Project vicinity = Project plus a 5-mile buffer
Status: Federal Endangered (FE), Federal Threatened (FT), Federal Candidate (FC), Federal Proposed (FP, FPE, FPT), Federal Delisted (FD), California Endangered (CE), California Threatened (CT), California Species of Special Concern (SSC), California Fully Protected Species (CFP), California Special Plant (CSP), California Special Animal (CSA) California Native Plant Society Designations:
1B = Rare, threatened, or endangered in California and elsewhere 2B = Rare, threatened, or endangered in California, but not elsewhere

0.1 = seriously endangered

0.2 = fairly endangered
CA = California
CNPS = California Native Plant Society
ft = foot/feet
m = meter/meters
mi = mile/miles
US = United States
E-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale

CRUSTACEANS
Vernal pool fairy
shrimp
Branchinecta lynchi US: FT
CA: –
Endemic to the grasslands of the Central Valley, Central Coast mountains, and South Coast mountains, in astatic
rain-filled pools. Inhabit small, clear-water sandstone-depression pools and grassed swale, earth slump, or basalt-flow depression pools.

Not expected. There is one known record
of occurrence in the project vicinity 1
(CNDDB 2006) and vernal pool habitat is
absent from the project site.

INSECTS
Monarch - California
overwintering
population
Danaus plexippus
pop. 1
US: FC
CA: SA
Winter roost sites extend along the coast from northern Mendocino to Baja California, Mexico. Roosts in wind-protected tree groves (eucalyptus, Monterey pine, cypress), with nectar and water sources nearby.

Not expected. There are six known
records of occurrence in the project
vicinity (CNDDB 1998, 2012, 2017,2022)
and suitable roosting trees and milkweed
are absent.

FISH
Tidewater goby Eucyclogobius
newberryi
US: FE
CA: –
Brackish water habitats along the California coast from Agua Hedionda Lagoon, San Diego County to the mouth of
the Smith River. Found in shallow lagoons and lower
stream reaches, they need fairly still but not stagnant water and high oxygen levels.

Not expected. There are no known
records of occurrence in the project
vicinity. No brackish water or lagoons are
present in the project site.

Unarmored
threespine
stickleback
Gasterosteus
aculeatus
williamsoni
US: FE
CA: CE
Weedy pools, backwaters, and among emergent
vegetation at the stream edge in small Southern California streams. Cool (<24 C), clear water with abundant
vegetation.

Not expected. There are no known
records of occurrence in the project
vicinity. No streams with emergent
vegetation is present within the project
site.

Arroyo chub Gila orcuttii US: –
CA: SSC
Native to streams from Malibu Creek to San Luis Rey River basin. Introduced into streams in Santa Clara, Ventura, Santa Ynez, Mojave and San Diego river basins. Slow
water stream sections with mud or sand bottoms. Feeds
heavily on aquatic vegetation and associated
invertebrates.

Not expected. There are no known
records of occurrence in the project
vicinity. No streams with emergent
vegetation is present within the project
site.

Steelhead - Southern
California DPS
Oncorhynchus
mykiss irideus pop.
10 US: FE
CA: –
Federal listing refers to populations from Santa Maria
River south to southern extent of range (San Mateo Creek in San Diego County). Southern steelhead likely have
greater physiological tolerances to warmer water and
more variable conditions.

Not expected. There are no records of
occurrence in the project vicinity and
suitable aquatic/stream habitat is absent
from the project.

E-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
steelhead - south-central California
coast DPS
Oncorhynchus
mykiss irideus pop.
9 US: FT
CA: –
Federal listing refers to runs in coastal basins from the Pajaro River south to, but not including, the Santa Maria River.

Not expected. There are no known
historical records of occurrence in the
project vicinity. No aquatic habitat is
present in the project.

AMPHIBIANS
California tiger
salamander - Santa
Barbara County DPS
Ambystoma
californiense pop. 2
US: FE
CA: CT
Lives in vacant or mammal-occupied burrows throughout
most of the year; in grassland, savanna, or open woodland habitats. Needs underground refuges, especially ground
squirrel burrows, and vernal pools or other seasonal water sources for breeding.

Low probability of occurrence. There are
10 known records of occurrence in the
project vicinity with the most recent from
2014 (CNDDB 2024). While there are no
vernal pools present within the project
site, CTS have been documented to breed
in sewage treatment plants. Furthermore,
active California ground squirrel burrows
were observed within the WWTP that
could provide upland sheltering habitat.

The project site is just outside the 2-mile
dispersal range of known breeding ponds,
there is some potential that CTS could use
the WWTP for breeding and upland
habitat.

Arroyo toad Anaxyrus californicus US: FE
CA: SSC
Semi-arid regions near washes or intermittent streams,
including valley-foothill and desert riparian, desert wash, etc. Rivers with sandy banks, willows, cottonwoods, and sycamores; loose, gravelly areas of streams in drier parts of range.

Not expected. There are no records of
occurrence in the project vicinity and
suitable aquatic/stream habitat is absent
from the project site.

Foothill yellow-legged frogRana boylii US: –
CA: CE, SSC
Partly-shaded, shallow streams and riffles with a rocky substrate in a variety of habitats. Needs at least some cobble-sized substrate for egg-laying. Needs at least 15 weeks to attain metamorphosis.

Not expected. There are no known
historical records of occurrence in the
project vicinity. No aquatic habitat is
present in the project site.

California red-legged
frog
Rana draytonii US: FT
CA: SSC
Lowlands and foothills in or near permanent sources of
deep water with dense, shrubby or emergent riparian
vegetation. Prefers aquatic habitat with deep (2 feet or deeper) areas
with undercut banks, emergent aquatic vegetation, and
bank cover. Does not occur in salt marshes or wetland with brackish water.

Low to moderate probability of
occurrence. There are 28 records of
occurrence in the project vicinity with the
most recent from 2007 (CNDDB 2024).

CLRF have potential to use the WWTP as
breeding, non-breeding, and dispersal
habitat. Several active California ground
squirrel burrows were observed in the
E-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
WWTP that could provide upland habitat.

Furthermore, several burrows were
observed along the eastern margin of the
project site adjacent to the agricultural
row crops that could provide upland
dispersal/sheltering habitat. These
burrows are in close proximity to several
irrigation basins located immediately
outside the project site boundary that
could provide habitat for CRLF.

Western spadefoot Spea hammondii US: –
CA: SSC
Occurs primarily in grassland and other relatively open habitats. Found in elevations ranging from sea level to 4,500 ft. Requires temporary pools for breeding.

Low to moderate probability of
occurrence. There are 17 records of
occurrence in the project vicinity with the
most recent from 2010 (CNDDB 2024).

The project site does not contain aquatic
habitat suitable for breeding. However,
several burrows were observed along the
eastern margin of the project site that
could provide upland dispersal/sheltering
habitat. These burrows are in close
proximity to several irrigation basins
located immediately outside the project
site boundary.

REPTILES
Northern California
legless lizard
Anniella pulchra US: –
CA: SSC
Sandy or loose loamy soils under sparse vegetation. Soil moisture is essential. They prefer soils with a high moisture content.

Low probability of occurrence. There are
15 records of occurrence in the project
vicinity with the most recent from 2016
(CNDDB 2024). Portions of the WWTP site
could provide suitable habitat. Although,
the routine maintenance and
longstanding agricultural activities reduce
suitability.

E-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
Western pond turtle Emys marmorata US: –
CA: SSC
A thoroughly aquatic turtle of ponds, marshes, rivers,
streams and irrigation ditches, usually with aquatic
vegetation, below 6000 ft elevation. Needs basking sites and suitable (sandy banks or grassy open fields) upland habitat up to 0.5 km from water for egg-laying.

Low to moderate probability of
occurrence. There is one record of
occurrence in the project vicinity (CNDDB
1995). Pond turtles have been
documented to breed and thrive in
sewage plants. Therefore, the WWTP has
potential to support aquatic and breeding
habitat. The agricultural portions of the
site do not contain aquatic or upland
habitat.

Coast horned lizard Phrynosoma
blainvillii
US: –
CA: SSC
Frequents a wide variety of habitats, most common in
lowlands along sandy washes with scattered low bushes.

Open areas for sunning, bushes for cover, patches of loose soil for burial, and abundant supply of ants and other
insects.

Low probability of occurrence. There are
three records of occurrence in the project
vicinity (CNDDB 2008, 2015). Portions of
the WWTP site could provide suitable
habitat. Although, the routine
maintenance and longstanding
agricultural activities reduce suitability.

Two-striped garter
snake
Thamnophis
hammondii
US: –
CA: SSC
Coastal California from Salinas to northwest Baja,
California; sea level to 7,000-foot elevation. Found in and near permanent freshwater streams with rocky beds and
riparian growth.

Not expected. There are no known
records of occurrence in the project
vicinity. The project site does not contain
suitable aquatic habitat.

BIRDS
Tricolored blackbird
(breeding colony)
Agelalus tricolor US: –
CA: CT, SSC
Occurs in open country or marshes in large colonies
mainly in California’s Central Valley. Breeds in freshwater marshes with tall emergent vegetation, feeds on insects.

Low to Moderate probability of nesting
and foraging. There are no known records
of occurrence in the project vicinity.

Several eBird records have documented
tricolored within the WWTP as recently as
2022. Emergent vegetation is present
along the perimeter of the ponds within
the WWTP and could provide suitable
nesting and foraging habitat.

Burrowing owl Athene cunicularia US: –
CA: SSC
Open, dry annual or perennial grasslands, deserts, and
scrublands characterized by low-growing vegetation.

Subterranean nester, dependent upon burrowing
mammals, most notably, the California ground squirrel.

Low to Moderate probability of
occurrence. There are two known records
of occurrence in the project vicinity
(CNDDB 2003, 2009). Several eBird
records have documented tricolored
E-5

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
within the WWTP as recently as 2010.

California ground squirrel burrows were
observed within the WWTP and could
provide nesting habitat.

Swainson's hawk Buteo swainsoni US: –
CA: CT
Breeds in grasslands with scattered trees, juniper-sage flats, riparian areas, savannahs, and agricultural or ranch lands with groves or lines of trees. Requires adjacent
suitable foraging areas such as grasslands, or alfalfa or grain fields supporting rodent populations.

Low to moderate probability of foraging,
nesting not expected. There is one
historical of occurrence in the project
vicinity (CNDDB 1896). There are several
eBird records within the vicinity of the
project with the most recent from 2018.

Suitable foraging habitat is present within
the project site.

Western snowy
plover
Charadrius
alexandrines
nivosus
US: FT
CA: SSC
Sandy beaches, salt pond levees and shores of large alkali lakes. Requires barren areas with sandy, gravelly or friable soils for nesting.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

American peregrine
falcon
Falco peregrinus
anatum
US: FD
CA: CD, FP
Near wetlands, lakes, rivers, or other water; on cliffs, banks, dunes, mounds; also, human-made structures.

Nest consists of a scrape or a depression or ledge in an open site.

Moderate probability of foraging, nesting
not expected. There are no known
records of occurrence in the project
vicinity. Several eBird records have
documented the species as recently as
2022 and one eBird record documented
the species within the WWTP in 2013.

Suitable nesting habitat is absent from the
project site, marginal foraging habitat is
present.

California black rail Laterallus
jamaicensis
coturniculus
US: –
CA: CT, FP
Inhabits freshwater marshes, wet meadows and shallow
margins of saltwater marshes bordering larger bays.

Needs water depths of about 1 inch that do not fluctuate during the year and dense vegetation for nesting habitat.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

There are no eBird records for this species
in the project vicinity.

Yellow warbler Setophaga petechia US: –
CA: SSC
Riparian plant associations in close proximity to water.

Also nests in montane shrubbery in open conifer forests in Cascades and Sierra Nevada. Frequently found nesting
and foraging in willow shrubs and thickets, and in other riparian plants including cottonwoods, sycamores, ash,
and alders.

Low to moderate probability of nesting
and foraging. There are no records of
occurrence in the project vicinity. There
are two eBird records of yellow warbler
within the WWTP as recently as 2020 and
several other eBird records from 2024
E-6

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
within the vicinity. The WWTP contains
suitable foraging and nesting habitat.

California least tern Sternula antillarum
browni
US: FE
CA: CE, FP
Nests along the coast from San Francisco Bay south to
northern Baja California. Colonial breeder on bare or
sparsely vegetated, flat substrates: sand beaches, alkali flats, land fills, or paved areas.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

There are no eBird records for this species
in the project vicinity.

Least Bell's vireo Vireo bellii pusillus US: FE
CA: CE
Summer resident of Southern California in low riparian in vicinity of water or in dry river bottoms; below 2000 ft.

Nests placed along margins of bushes or on twigs
projecting into pathways, usually willow, Baccharis,
mesquite.

Not Expected. There are no known
historical records of occurrence in the
project vicinity or documented eBird
records. Marginal nesting Suitable nesting
habitat is present in the WWTP.

MAMMALS
Pallid bat Antrozous pallidus US: –
CA: SSC
Deserts, grasslands, shrublands, woodlands and forests.

Most common in open, dry habitats with rocky areas for
roosting.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

Townsend's big-eared batCorynorhinus
townsendii
US: –
CA: SSC
Throughout California in a wide variety of habitats. Most common in mesic sites. Roosts in the open, hanging from walls and ceilings. Roosting sites limiting. Extremely
sensitive to human disturbance.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

Western red bat Lasiurus blossevillii US: –
CA: SSC
Roosts primarily in trees, 2–40 ft above ground, from sea level up through mixed conifer forests. Prefers habitat edges and mosaics with trees that are protected from
above and open below, with open areas for foraging.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

American badger Taxidea taxus US: –
CA: SSC
Most abundant in drier open stages of most shrub, forest, and herbaceous habitats, with friable soils. Needs
sufficient food, friable soils and open, uncultivated
ground. Preys on burrowing rodents. Digs burrows.

Not Expected. There are four records of
occurrence in the project vicinity (CNDDB
1984, 1988, 1989, 1991) and suitable
habitat is absent.
1 Project vicinity = Project site plus a 5-mile buffer
Status: Federal Endangered (FE), Federal Threatened (FT), Federal Candidate (FC), Federal Proposed (FP, FPE, FPT), Federal Delisted (FD), California Endangered (CE), California Threatened (CT), California Species of Special Concern (SSC), California Fully Protected Species (FP), California Special Animal (CSA) CA = California
DPS= Distinct Population Segment
ft = foot/feet
m = meter/meters
mi = mile/miles
US = United States
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX G BASIN PLAN OBJECTIVES
Central Coastal Basin Plan -36- June 2019 Edition
Table 3-1. Guidelines for Interpretation of Quality of Water for Irrigationa Water Quality Guidelines
Problem and Related Constituent No Problem Increasing
Problems
Severe
Salinityb
EC of irrigation water, mmho/cm <0.75 0.75 - 3.0 >3.0
Permeability
EC of irrigation water, mmho/cm >0.5 <0.5 <0.2
SAR, adjustedc <6.0 6.0 - 9.0 >9.0
Specific ion toxicityd from root absorption
Sodium (evaluate by adjusted SAR) <3 3.0 - 9.0 >9.0
Chloride
me/L <4 4.0 - 10 >10
mg/L <142 142 - 355 >355
Boron, mg/L <0.5 0.5 - 2.0 2.0 - 10.0
Specific ion toxicityd from foliar absorptione (sprinklers) Sodium
me/L <3.0 >3.0 --
mg/L <69 >69 --
Chloride
me/L <3.0 >3.0 --
mg/L <106 >106 --
Miscellaneousf
NH4 - N, mg/L for sensitive crops <5 5 - 30 >30
NO3 - N, mg/L for sensitive crops <5 5 - 30 >30
HCO3 (only with overhead sprinklers)
me/L <1.5 1.5 - 8.5 >8.5
mg/L <90 90 - 520 >520
pH Normal range 6.5 - 8.4 --
a. Interpretations are based on possible effects of constituents on crops and/or soils. Guidelines are flexible and should be modified when warranted by local experience or special conditions of crop, soil, and method of irrigation. b. Assumes water for crop plus needed water for leaching requirement (LR) will be applied. Crops vary in tolerance to salinity. Refer to tables for crop tolerance and LR. The mmho/cm x 640 = approximate total dissolved solids (TDS) in mg/L or ppm; mmho x 1,000 = micromhos. c. Adjusted SAR (sodium adsorption ratio) is calculated from a modified equation developed by U.S. Salinity Laboratory to include added effects of precipitation and dissolution of calcium in soils and related to CO3 + HCO3 concentrations.

To evaluate sodium (permeability) hazard: Adjusted SAR = Na/[1/2 (Ca + Mg)] 1/2[1+ (8.4 - pHc)].

Refer to Appendix A-26 for calculation assistance.

SAR can be reduced if necessary by adding gypsum. Amount of gypsum required (GR) to reduce a hazardous SAR to any desired SAR (SAR desired) can be calculated as follows:

Note: Na and Ca + Mg should be in me/L. GR will be in lbs. of 100 percent gypsum per acre foot of applied water. d. Most tree crops and woody ornamentals are sensitive to sodium and chloride (use values shown). Most annual crops are not sensitive (use salinity tolerance tables). For boron sensitivity, refer to boron tolerance tables. A source of tolerance tables is “Agricultural Salinity and Drainage,” University of California Water Management Series publication 3375, revised 2006. e. Leaf areas wet by sprinklers (rotating heads) may show a leaf burn due to sodium or chloride absorption under low humidity/high evaporation conditions. (Evaporation increases ion concentration in water films on leaves between rotations of sprinkler heads.) f. Excess N may affect production or quality of certain crops; e.g., sugar beets, citrus, avocados, apricots, etc. (1 mg/L NO3 - N = 2.72 lbs. N/acre foot of applied water.) HCO3 with overhead sprinkler irrigation may cause a white carbonate deposit to form on fruit and leaves. 234Mg)+(Ca SAR desired
2(Na ) GR = 2
2 

 

 −
Central Coastal Basin Plan -37- June 2019 Edition
Table 3-2. Water Quality Objectives for Agricultural Water Use _____________________________________________________________________________________ Maximum Concentration (mg/L)
a
Element Irrigation Livestock
supplyb watering
_____________________________________________________________________________________ Aluminum 5.0 5.0
Arsenic 0.1 0.2
Beryllium 0.1 --
Boron 0.75 5.0
Cadmium 0.01 0.05
Chromium 0.10 1.0
Cobalt 0.05 1.0
Copper 0.2 0.5
Fluoride 1.0 2.0
Iron 5.0 --
Lead 5.0 0.1c
Lithium 2.5d --
Manganese 0.2 --
Mercury -- 0.01
Molybdenum 0.01 0.5
Nickel 0.2 --
Nitrate + Nitrite -- 100
Nitrite -- 10
Selenium 0.02 0.05
Vanadium 0.1 0.10
Zinc 2.0 25
_____________________________________________________________________________________ a. Values based primarily on "Water Quality Criteria 1972" National Academy of Sciences-National Academy of Engineers, Environmental Study Board, ad hoc Committee on Water Quality Criteria furnished as recommended guidelines by University of California Agriculture Extension Service, January 7, 1974; maximum values are to be considered as 90 percentile values not to be exceeded.
b. Values provided will normally not adversely affect plants or soils; no data available for mercury, silver, tin, titanium, and tungsten.
c. Lead is accumulative and problems may begin at threshold value (0.05 mg/L). d. Recommended maximum concentration for irrigating citrus is 0.075 mg/L.

Central Coastal Basin Plan -41- June 2019 Edition
Table 3-6. Median Groundwater Objectives, mg/La
Basin/Sub-Area TDS Cl SO4 B Na Nb
Big Basin
Near Felton 100 20 10 0.2 10 1
Near Boulder Creek 250 30 50 0.2 20 5
Pajaro Valley
Hollister 1200 150 250 1.0 200 5
Tres Pinos 1000 150 250 1.0 150 5
Llagas 300 20 50 0.2 20 5
Salinas Valley
Upper Valleyf 600 150 150 0.5 70 5
Upper Forebayf 800 100 250 0.5 100 5
Lower Forebayf 1500 250 850 0.5 150 8
180 foot Aquiferf 1500 250 600 0.5 250 1
400 foot Aquiferf 400 50 100 0.2 50 1
Paso Robles Areag
Central Basinf 400 60 45 0.3 80 3.4
San Miguelf 750 100 175 0.5 105 4.5
Paso Roblesf 1050 270 200 2.0 225 2.3
Templetonf 730 100 120 0.3 75 2.7
Atascaderof 550 70 85 0.3 65 2.3
Estrellaf 925 130 240 0.75 170 3.2
Shandon 1390 430 1025h 2.8 730 2.3
Estero Bay
Santa Rosa 700 100 80 0.2 50 5
Chorro 1000 250 100 0.2 50 5
San Luis Obispo 900 200 100 0.2 50 5
Arroyo Grande 800 100 200 0.2 50 10
Carrizo Plain e e e e e e
Santa Maria River Valleyc
Upper Guadalupef 1000d 165 500d 0.5 230 1.4e
Lower Guadalupef 1000d 85 500d 0.2 90 2.0e
Lower Nipomo Mesaf 710 95 250 0.15 90 5.7e
Orcuttf 740 65 300 0.1 65 2.3e
Santa Mariaf 1000d 90 510 0.2 105 8.0e
Cuyama Valley 1500 80 -- 0.4 -- 5
San Antonio Creek Valley 600 150 150 0.2 100 5
Santa Ynez River Valley
Santa Ynez 600 50 10 0.5 20 1
Santa Rita 1500 150 700 0.5 100 1
Lompoc Plainf 1250 250 500 0.5 250 2
Lompoc Uplandf 600 150 100 0.5 100 2
Lompoc Terracef 750 210 100 0.3 130 1
South Coast
Goleta 1000 150 250 0.2 150 5
Santa Barbara 700 50 150 0.2 100 5
Carpinteria 700 100 150 0.2 100 7
a. Objectives shown are median values based on data averages; objectives are based on preservation of existing quality or water quality enhancement believed attainable following control of point sources. b. Measured as Nitrogen
c. Basis for objectives is in the "Water Quality Objectives for the Santa Maria Ground Water Basin Revised Staff Report, May 1985" and February 1986, Staff Report.
d. These are maximum objectives in accordance with Title 22 of the Code of Regulations. e. Groundwater basin currently exceeds usable mineral quality. f. Groundwater basin boundary maps available in the Appendix: Salinas (Appendix A-32), Paso Robles (Appendix A-33), Santa Maria (Appendix A-34), and Lompoc (Appendix A-35).
g. Basis for objectives is in the report "A Study of the Paso Robles Ground Water Basin to Establish Best Management Practices and Establish Salt Objectives", Coastal Resources Institute, June 1993. h. Standard exceeds California Secondary Drinking Water Standards contained in Title 22 of the Code of Regulations. Water quality standard is based upon existing water quality. If water quality degradation occurs, the Regional Board may consider salt limits on appropriate discharges.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX H SANTA MARIA UPDATED NOTICE OF

APPLICABILITY AND MONITORING AND

REPORTING PROGRAM
Central Coast Regional Water Quality Control Board
June 16, 2023 Sent Via Electronic Mail
Shad Springer, Director of Utilities
City of Santa Maria – Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:
• NOTICE OF APPLICABILITY FOR ENROLLMENT IN ORDER NO. R3-2020- 0020, GENERAL WASTE DISCHARGE REQUIREMENTS FOR DISCHARGES

FROM DOMESTIC WASTEWATER SYSTEMS WITH FLOWS GREATER
THAN 100,000 GALLONS PER DAY;
• TRANSMITTAL OF MONITORING AND REPORTING PROGRAM NO. R3- 2023-0032; AND
• TERMINATION OF INDIVIDUAL PERMIT, WASTE DISCHARGE
REQUIREMENTS ORDER NO. R3-2010-0001 FOR THE CITY OF SANTA MARIA WASTEWATER FACILITY, SANTA BARBARA COUNTY.

The Central Coast Regional Water Quality Control Board (Central Coast Water Board) reviewed the August 5, 2022, notice of intent and available documents associated with City of Santa Maria’s domestic wastewater treatment facility (Wastewater System) located at 601 Black Road in Santa Maria, California. The Wastewater System, owned by the City of Santa Maria is currently regulated pursuant to Waste Discharge Requirements Order No. R3-2010-0001 for the City of Santa Maria Wastewater Facility, Santa Barbara County (Order No. R3-2010-0001).

On September 25, 2020, the Central Coast Water Board adopted General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).

This letter serves as a notice of applicability for enrollment in the General Permit. This letter includes: wastewater system operation summary, specific requirements, and City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
limitations (Attachment 1); figures (Attachment 2); and City of Santa Maria’s monitoring and reporting program requirements (Attachment 3).

This letter also serves as a notice of termination of City of Santa Maria’s coverage in existing individual permit, Order No. R3-2010-0001.

City of Santa Maria must comply with the following:

1. General Permit – City of Santa Maria must comply with all conditions and requirements of the General Permit. As described in the General Permit, ongoing operation, maintenance, monitoring, and reporting are required. A copy of the General Permit can be found electronically at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/r32020_0020.pdf

2. Monitoring and Reporting Program – City of Santa Maria must comply with the requirements of the monitoring and reporting program enclosed with this letter (monitoring and reporting program no. R3-2023-0032, Attachment 3). City of Santa Maria must start implementing the monitoring on October 1, 2023. The first quarterly monitoring report is due February 1, 2024 and the first annual report is due March 1, 2024. City of Santa Maria is also required to submit an annual pretreatment program report1 due on March 1st and the annual volumetric reporting requirements2 established by the State Water Resources Control Board (State Water Board), due April 30th. Annual reports must be submitted to the GeoTracker database.

Quarterly monitoring reports and annual reports must be provided electronically in searchable PDF with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed. https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater _permitting/docs/transmittal_sheet.pdf
All annual reports must be formatted and completed as specified in the annual report template found at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf
City of Santa Maria must submit all reports/documents and laboratory data (using the transmittal sheet as the cover page) to the publicly accessible State Water 1 California Code of Regulations title 23 section 2233 View Document - California Code of Regulations (westlaw.com)
2 See: Volumetric Annual Reporting | California State Water Resources Control Board City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Board’s GeoTracker3,4 database with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System – specific global identification number WDR100029526 over the internet at:
https://geotracker.waterboards.ca.gov/esi/login.asp
The attached monitoring and reporting program outlines the GeoTracker electronic reporting requirements. The Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.

3. Fees – City of Santa Maria paid an annual fee of $123,934.00 on January 24, 2023 for coverage in existing individual permit, Order No. R3-2010-0001. This payment covers City of Santa Maria‘s enrollment in the General Permit for the 2022-2023 fiscal year.

City of Santa Maria must pay an annual fee to maintain coverage in the General Permit. Annual fees are determined by the State Water Board’s fee program and cover the state fiscal year of July 1 through June 30. The Central Coast Water Board has lowered your assigned threat and complexity rating to 2A which will result in a reduced annual fee (currently $41,063) starting with the 2023-2024 fiscal year. A copy of the current state fee schedule is available electronically at the following link:
https://www.waterboards.ca.gov/resources/fees/water_quality/#wdr

4. Notification – The Central Coast Water Board will be notified of City of Santa Maria’s enrollment at a regularly scheduled public meeting on August 24-25, 2023. Details about that meeting are available on our website at:
https://www.waterboards.ca.gov/centralcoast/board_info/agendas/

5. Future Discharge Modifications – Pursuant to California Water Code section 13260, City of Santa Maria must inform the Central Coast Water Board at least 120 days prior to modifying your discharge. If there are any significant changes in either treatment or disposal methodologies, or the volume or character of the treated wastewater, City of Santa Maria must notify the Central Coast Water Board immediately of such changes.
3 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/ 4 Additional information available at: http://geotracker.waterboards.ca.gov/ City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Attachment 1 contains the Central Coast Water Board’s understanding of the Wastewater System located at 601 Black Road, Santa Maria, CA 93458. Please review Attachment 1 to determine if the description is representative of your current system. Pursuant to California Water Code section 13267, City of Santa Maria must notify the Central Coast Water Board if this information is out of date or incorrect. You are required to provide staff with your updated information within 30 days of issuance of this letter.

6. Responsible Party – City of Santa Maria is responsible for the management and disposal of the domestic wastewater in compliance with the conditions of the General Permit. Any noncompliance with this General Permit constitutes a violation of the California Water Code, and subjects City of Santa Maria to enforcement action, and termination of enrollment under this General Permit.

7. Change in Ownership - In the event of any change in control or ownership of the property, City of Santa Maria must notify the succeeding owner or operator of the existence of this General Permit by letter, a copy of which shall be immediately forwarded to the Central Coast Water Board so that the new owner or operator can be enrolled in the General Permit and City of Santa Maria’s enrollment in the General Permit can be terminated.

8. Certified Operator – City of Santa Maria is required to comply with the operator certification requirements5 administered by the State Water Board’s Office of Operator Certification, which currently requires a Grade IV certified operator onsite to maintain and operate the Wastewater System. The City of Santa Maria must:
a. Keep a current Wastewater Treatment Plant Classification Form on file with the Office of Operator Certification and update the form when modifications to the Wastewater System treatment processes occur. b. Provide the Office of Operator Certification with a Chief Plant Operator Acknowledgement Form and update this information within 30 days of a change of Chief Plant Operator.
c. If a contractor operator is used, the contract operator must register with the Office of Operator Certification and obtain a contract operator certificate for the Wastewater System.

Forms are available at the following link:
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/for m.html
5 Title 23 Division 3. Chapter 26 Wastewater Treatment Plant Classification, Operator Certification and Contract Operator Registration.
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/docs/ocr_clean.pdf City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant

9. Termination of Permit – The existing individual permit, Order No. R3-2010-0001 is terminated, except for enforcement purposes.6 City of Santa Maria is responsible for compliance with Order No. R3-2010-0001 prior to the date of this letter.

10.Compliance Plan – As required in the attached monitoring and reporting program, City of Santa Maria must, by June 16, 2024, prepare and submit for Central Coast Water Board review and approval a time schedule compliance plan.

If you have any questions, please contact Cecile Blancarte at (805) 542-4782 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].

Sincerely,
for Matthew T. Keeling
Executive Officer
Attachments:

Attachment 1: Wastewater System Operation Summary, Specific Requirements, and Limitations
Attachment 2: Figures
Attachment 3: Monitoring and Reporting Program Order No. R3-2023-0032

cc:

Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Office of Operator Certification, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Jesse Woodard, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
6 The General Permit states “… where a Wastewater System discharge is currently regulated by an individual permit, that permit is terminated upon the enrollment of the Wastewater System into this General Permit.”
Jennifer Epp Digitally signed by Jennifer Epp
Date: 2023.06.15 16:19:26
-07'00'
City of Santa Maria - 6 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ECM/CIWQS = CW-255678
GeoTracker No. = GT- WDR100029526
Rev 12/21/2022
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant NOA for R3- 2020-0020
\\ca.epa.local\rb\rb3\shared\wdr\wdr facilities\santa barbara co\santa maria wwtp\order 2020- 0020\final\santa maria r3-2020-0020 noa_final.docx
ATTACHMENT 1

WASTEWATER SYSTEM OPERATION SUMMARY, SPECIFIC REQUIREMENTS,

AND LIMITATIONS

1. OWNERSHIP AND WASTEWATER SYSTEM INFORMATION
Ownership and wastewater system information submitted by City of Santa Maria to the Central Coast Water Board is shown in Table 1.

Table 1. Ownership and Wastewater System Information
Name City of Santa Maria Wastewater
Treatment Plant
Physical Address 601 Black Road Santa Maria, CA 93458
Lattitude 34°56'54.93"N
Longitude 120°29'49.59"W
Mailing Address 2065 E. Main Street, Santa Maria, CA
93454
Owner City of Santa Maria
Operator
Russ P. Newman
phone: (805) 925-0951 x721
e-mail: [email protected]
Legally Responsible Official
Shad Springer
phone: (805) 925-0951 x7211
e-mail: [email protected]
Raw Wastewater
Characteristics
Sewer Connections: 22,020
Population Served: 107,407
Domestic (%): 91%
Industrial (%): 9%
Permitted Design Flow,
Average Monthly (Million
gallons per day, mgd)

8.0 Baseline Flow (average
annual flow) in mgd

7.2 Threat to Water Quality 2
Complexity B
For Internal Use
Fee Code 58
Primary Place Type Wastewater Treatment Facility
Facility Type Municipal/Domestic
Facility Waste Type Domestic Wastewater
Regulatory measure Type Enrollee - WDR
Reclamation Included No
EPA Approved Pretreatment
Program
Yes
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant

2. WASTEWATER SYSTEM OPERATION SUMMARY
The City of Santa Maria wastewater treatment facility (Wastewater System) is a Class IV wastewater system. City of Santa Maria must staff a Grade IV chief plant operator for proper operation of the Wastewater System. The current chief plant operator is Russ P.

Newman, Grade IV, Operator No. 29543, Certificate No. 28863 (expires 1/18/2026).

The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd. The Wastewater System consists of the treatment technologies and treatment capabilities shown in Table 2.

Table 2. Treatment Technology and Capacity
Headworks/Preliminary
Treatment
The headworks consists of a Parshall flume flow meter,
three automatic bar screens followed by two aerated grit chambers.

Headworks capacity (mgd): 13.5
Primary Treatment
Clarifiers: Primary treatment consists of two primary
clarifiers that operate in parallel. The volume of each clarifying tank is 1.32 million gallons.

Primary treatment capacity (mgd): 27.92
Secondary Treatment
Trickling Filters: Secondary treatment is performed using two primary and two secondary aerobic trickling filters.

Each of the primary trickling filters has a volume of
543,000 gallons. Each of the secondary trickling filters has a volume of 170,000 gallons.

Secondary treatment capacity (mgd): 17.7
Tertiary Treatment Not Applicable
Tertiary treatment capacity (gpd): 0
Disinfection Not Applicable
Disinfection Capacity (gpd): 0
Wastewater Disposal
Method
Percolation Ponds, 123 acres
Disposal capacity (mgd): 8.0
Biosolids/Sludge
Production and
Handling
Gravity Thickeners (2), Anaerobic Digestors (4), and
Sludge Drying Beds, Offsite Composting, and Landfilling Annual production of biosolids: 1,811 tons
The final destination of biosolids produced is hauled off to Engel and Gray Composting, Inc. located at 468-594 Ray
Road, Santa Maria, California, and the City of Santa Maria Landfill, 2065 E. Main Street, Santa Maria, California
Non-Potable Recycled
Water
Non-potable recycled
water produced onsite: Not Applicable
Recycled water usage
areas: Not Applicable
City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Enrolled in WQ 2016-
0068-DDW: Not Applicable
Recycled water production
volume (gpd): Not Applicable
A summary of historic and recent average effluent concentrations is included in Table 3, which were reported in City of Santa Maria quarterly monitoring reports. The Central Coast Water Board used reported effluent water quality data to establish the effluent and groundwater limitations in section 3.

Table 3. Effluent Water Quality for Select Constituents Constituents Unit [1][2] Historical
Average[3]
Annual Average
for 2022[4]
Carbonaceous Biochemical
Oxygen Demand, 5-Day[5] mg/L 43 45
Total Suspended Solids mg/L 39 37
Total Dissolved Solids mg/L 844 1,055
Chloride mg/L 156 143
Sodium mg/L 145 140
Sulfate mg/L 196 320
Boron mg/L 0.35 0.41
Total Nitrogen mg/L 43 42
Settleable Solids ml/L[4] <0.1 <0.1
pH Standard
Units 8 7.8
[1] mg/L denotes milligrams per liter.
[2] ml/L denotes milliliters per liter.
[3] Based on water quality data reported by City of Santa Maria in their 2018 to 2022 monitoring reports. [4] Based on water quality data reported by City of Santa Maria in the 2022 Annual Monitoring Report. [5] The City of Santa Maria has been reporting carbonaceous biochemical oxygen demand (CBOD) instead of biochemical oxygen demand (BOD). Monitoring and reporting program no. R3-2023-0032 requires the City of Santa Maria to report BOD.

3. WASTEWATER SYSTEM SPECIFIC REQUIREMENTS AND LIMITATIONS City of Santa Maria must operate the Wastewater System in accordance with the General Permit and this notice of applicability. City of Santa Maria must comply with the wastewater specific limitations specified in Table 4 through Table 8.

Flow limitations are shown in Table 4. Interim effluent limitations shown in Table 5 apply until June 16, 2025. After June 16, 2025, effluent limitations shown in Table 6 and Table 7 apply.

A. Flow Limitations:

Table 4. Flow Limitations
Flow Units Limit Point of
Compliance
Maximum Daily Flow to Disposal Ponds mgd 8.0 Influent IS-1 City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
B. Effluent Limitations:

Based on reported water quality data, effluent water quality for Carbonaceous Biochemical Oxygen Demand and Total Suspended Solids (TSS) (see Table 3) exceed the General Permit effluent limits for a trickling filter treatment system. Therefore, pursuant to the General Permit, City of Santa Maria can comply with their individual permit No. R3-2010-0001 5-day Biochemical Oxygen Demand (BOD5) and TSS limits for two years. After June 16, 2025, trickling filter effluent limitations shown in Table 6 apply.

Table 5. Interim Effluent Limitations: Trickling Filters (Until June 16, 2025) Constituent Units 30-Day
Average
Daily
Maximum
Biochemical Oxygen Demand, 5-Day mg/L 60 100
Total Suspended Solids mg/L 60 100
Settleable Solids mL/L 0.1 0.4
Total Dissolved Solids1 mg/L 1,000 Not Applicable
Sodium1 mg/L 180 Not Applicable
Chloride1 mg/L 180 Not Applicable
pH Standard
Units
Between 6.5
and 8.4
Between 6.5
and 8.4
[1] Compliance shall be based on a three-year running mean.

Table 6. Effluent Limitations[1] (After June 16, 2025)
Constituent Units 30-Day
Average
7-Day
Average
Sample
Maximum
Biochemical Oxygen
Demand, 5-Day mg/L 30 45 Not Applicable
Total Suspended Solids mg/L 30 45 Not Applicable
Settleable Solids mL/L 0.1 0.3 0.5
pH Standard
Units
Between 6.5
and 8.4
Not
Applicable Not Applicable
[1] The Central Coast Water Board understands that the City of Santa Maria will be upgrading the Wastewater System to comply with the new effluent limitations. Pursuant to General Permit Tables 3 through 5, the values in this table will vary depending on the treatment technology chosen. By June 16, 2024, the City of Santa Maria must report to the Central Coast Water Board the treatment technology chosen for the upgrades such that this notice of applicability can be updated as needed.

Table 7. Effluent Limitations (After June 16, 2025)
Based on - Upper Guadalupe Groundwater Basin
Constituents Units 25-Month Rolling Median[1]
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 105
Sulfate mg/L 500
Boron mg/L 0.5
City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Constituents Units 25-Month Rolling Median[1]
Total Nitrogen mg/L 10
[1] Rolling Median is the median from all data collected over the most recent 25 months.

C. Groundwater Limitations:

Based on review of historical effluent water quality (see Table 3), City of Santa Maria is currently unable to consistently comply with the General Permit effluent limitations for total nitrogen. The Central Coast Water Board understands that the City of Santa Maria will be designing upgrades to the Wastewater System to comply with the General Permit and will be providing a time schedule compliance plan as described in monitoring and reporting program no. R3-2023-0032. In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent. Option 1 is to comply with the effluent limits in Table 7.

Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan including the limitations listed in Table 8.

Table 8. Groundwater Limitations
for Designated Groundwater Basin – Upper Guadalupe Groundwater Basin Constituents Units 25-Month Rolling Median
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 230
Sulfate mg/L 500
Boron mg/L 0.5
Total Nitrogen mg/L 1.4
City of Santa Maria - 1 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ATTACHMENT 2

FIGURES
Figure 1 - Vicinity Map
City of Santa Maria
Wastewater
Treatment Plant
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 2- City of Santa Maria Wastewater Treatment Plant Site Map City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 3 - Process Flow Schematic

CENTRAL COAST REGIONAL WATER QUALITY CONTROL BOARD
MONITORING AND REPORTING PROGRAM NO. R3-2023-0032
June 16, 2023
MODIFICATION OF MONITORING AND REPORTING PROGRAM NO. R3-2020-0020 FOR

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT

SANTA MARIA, SANTA BARBARA COUNTY
This Monitoring and Reporting Program applies to the monitoring and reporting requirements for the City of Santa Maria Wastewater Treatment Plant (Wastewater System) enrolled in General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).

The City of Santa Maria owns and operates the Wastewater System that is subject to the General Permit and notice of applicability. The City of Santa Maria must not implement any changes to this monitoring and reporting program unless and until a revised monitoring and reporting program is issued by the Central Coast Regional Water Quality Control Board (Central Coast Water Board).

The State Water Resources Control Board (State Water Board) and Regional Water Quality Control Boards are transitioning to the use of the publicly accessible State Water Board’s GeoTracker database for the tracking of environmental and regulatory data for sites that operate under waste discharge requirements. The monitoring and reporting program directs the City of Santa Maria to submit reports (both technical and monitoring reports) and analytical data electronically to the State Water Board’s GeoTracker database (see monitoring and reporting program section VI.C).

I. SAMPLING AND ANALYSIS
The City of Santa Maria must collect representative samples in accordance with the most recently approved sampling and analysis plan contained in the Operations and Maintenance Manual and validate analytical results prior to submittal to the Central Coast Water Board. All samples (e.g., wastewater, groundwater, soil, sludge) must be representative of the volume and nature of the discharge or matrix of materials sampled.

All samples must be collected by a qualified person, trained in proper procedures for collecting the samples. The name of the sampler, sample type (grab or composite), time, date, location, bottle/container type, and any preservative used for each sample must be recorded on the sample chain of custody form. The chain of custody form must also contain all custody information including date, time, and to whom samples were relinquished. If composite samples are collected, the basis for sampling (time or flow weighted) must be included in the sampling and analysis plan contained in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
2 Operations and Maintenance Manual for Central Coast Water Board review and approval.

A. Sampling Schedule – Unless otherwise specified below, sampling must be performed in accordance with Table 1.

Table 1. Sampling Schedule
Monitoring Period Sample Collection Time
Quarterly January, April, July, and October
Semiannual April and October
Annual October
Field test instruments (such as those used to evaluate pH, dissolved oxygen, and electrical conductivity) may be used if they are used by a State Water Board Environmental Laboratory Accreditation Program accredited laboratory, or:

1. The user is trained in proper use and maintenance of the instruments;

2. The instruments are field calibrated prior to monitoring events at the frequency recommended by the manufacturer;

3. Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency; and

4. Field calibration reports are maintained and available for at least three years.

B. Monitoring Location Descriptions – All samples including influent samples (IS), effluent samples (ES), and groundwater monitoring wells (MW) must be collected at the locations described in Table 2. These locations must be consistent with the Central Coast Water Board approved sampling and analysis plan. The City of Santa Maria must upload the GeoTracker field point information for each sampling location in the GeoTracker database once, prior to uploading laboratory data (see Table 10).

Table 2. Sample Identification Details
GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Influent Sample IS-1 Raw wastewater sample collected
at the headworks
Effluent Sample ES-1
Treated wastewater sample
collected downstream of the
secondary clarifiers
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
3 GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Effluent Sample
ES-A, ES-1a, ES-2 through
ES-8, ES-11 through ES-15,
and ES-DKC
Treated wastewater sample
collected from the percolation
ponds
Monitoring Well MW-5H
Background Groundwater
Monitoring Well
Top of casing elevation unknown
Perforations 160 to 602 ft bgs
Monitoring Well MW-UMW1
Groundwater Monitoring Well
Top of Casing Elevation 175.6 ft
amsl
Screened elevations unknown
Monitoring Well MW-DMW1
Groundwater Monitoring Well
Top of Casing Elevation 158.16 ft
amsl Screened 87 to 135 ft bgs
Monitoring Well MW-DMW2
Groundwater Monitoring Well
Top of Casing Elevation 157.2 ft
amsl
Screened 82 to 155 ft bgs
Water Supply
Well
WSW-1[3] Representative sample from
potable well serving the city
[1] ft amsl denotes feet above mean sea level.
[2] ft bgs denotes feet below grade surface.
[3] Water supply sample data should be included in the annual report but does not need to be uploaded to GeoTracker if the Central Coast Water Board approves submittal of a Well Identification Number pursuant to the Water Supply Monitoring section below.

II. WATER SUPPLY MONITORING
Representative samples of the City of Santa Maria’s raw water supply (sampled before use or treatment) must be collected and analyzed, at a minimum, for constituents specified in Table 3.

In lieu of the required water supply sampling, the City of Santa Maria may request Central Coast Water Board approval to submit a Well Identification Number and the reporting year’s consumer confidence report (annual water quality report or drinking water quality report), as required by the State Water Board Division of Drinking Water and/or county, provided, at a minimum, all of the required constituents are sampled at the frequency specified in Table 3. The City of Santa Maria must report the results of any constituent monitored more frequently than is required by the monitoring program shown in Table 3. The City of Santa Maria must also report detectable concentrations (above the reporting limit) for any other constituent that has a published maximum contaminant level (MCL).

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
4 The City of Santa Maria must evaluate and provide a tabular summary of the water supply data with the annual monitoring report.

Table 3. Water Supply Monitoring
Constituent Units[1] Sample Type Sampling Frequency
Nitrate (as N) mg/L Grab Annually
Total Dissolved Solids mg/L Grab Annually
Chloride mg/L Grab Annually
Sodium mg/L Grab Annually
Sulfate mg/L Grab Annually
Boron mg/L Grab Annually
Carbonate mg/L Grab Annually
Bicarbonate mg/L Grab Annually
Calcium mg/L Grab Annually
Potassium mg/L Grab Annually
Magnesium mg/L Grab Annually
[1] mg/L denotes milligrams per liter.

III. INFLUENT AND EFFLUENT MONITORING
A. Influent Flow Monitoring – The City of Santa Maria must monitor and report flow in million gallons per day, as described in Table 4, with each monitoring report. See monitoring and reporting program section VI.A.4 for supplemental volumetric annual reporting requirements established by the State Water Board.

Table 4. Influent Flow Monitoring
Parameter Sample Type Sampling Frequency Sample Location Daily Flow Metered Daily IS-1
Maximum
Daily Flow Metered Monthly IS-1
Mean Daily
Flow Calculated Monthly IS-1
Percent of
Permitted
Flow [1]
Calculated Quarterly IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
5 [1] The General Permit notice of applicability specifies the Wastewater System’s maximum permitted flow. In the monitoring reports, the City of Santa Maria must evaluate and provide a comparison of monitored flow to the permitted flow.

B. Wastewater System Monitoring – Representative samples of The City of Santa Maria’s influent (raw wastewater) into the Wastewater System and effluent (treated wastewater) discharged to percolation ponds must be collected and analyzed in accordance with the treatment technology-based monitoring requirements (including sample type and frequency) summarized in the tables below. See Figure 1 for the location of samples and GeoTracker field points.

Figure 1. Process Flow Diagram and Sample Locations Referenced in Table 2

IS-1
ES-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
6 Figure 2. Percolation Pond and Groundwater Monitoring Well Sample Locations Referenced in Table 2

ES-2
ES-3
ES-4
ES-1a
ES-5
ES-6
ES-7
ES-8
ES-DKC
ES-12
ES-11
ES-14
ES-13
ES-15
MW-DMW1
MW-DMW2
MW-UMW1
ES-1
IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
7 Figure 3. Water Supply and Groundwater Monitoring Well Sample Locations Referenced in Table 2

1. Pond System Monitoring
i. Required Pond Monitoring – All wastewater treatment and treated wastewater storage/disposal ponds (lined and unlined) must be monitored as specified in Table 5. Sampling for dissolved oxygen must be a grab sample taken from 1 foot below pond surface1.

Observations do not need to be reported in the monitoring reports unless a violation, significant change, or treatment issue is observed. Photos of the pond(s) verifying the observations must be collected annually and included in the annual report, with the date and location of the photo clearly marked. Observations must be noted in a logbook or database and made available to the Central Coast Water Board upon request. Any problems must be promptly corrected and recorded.
1 Pond dissolved oxygen sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.

MW-5H
MW-DMW2
MW-DMW1
MW-UMW1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
8 Table 5. Wastewater Treatment/Storage/Disposal Pond Monitoring Parameter/
Constituent Units Sample Type Sampling/Monitoring
Frequency
Freeboard 0.1 feet Measured Weekly
Dissolved Oxygen
(in pond)
[4] mg/L Grab Monthly
Sludge Depth[1] 0.1 feet Measured Annually
Color Not
applicable Observation Monthly
Vegetation in and
surrounding ponds
Not
Applicable Observation Monthly
Berm condition Not
Applicable Observation Monthly
Precipitation inches/day
and date Measured [2] Each precipitation event [3]
[1] Sludge depth will not be required at disposal ponds if the disposal pond was dried and scarified within the reporting year. The annual report must provide dates of when the disposal ponds have been dried and scarified.
[2] The City of Santa Maria may use a rain gauge or use a National Oceanic and Atmospheric Administration, United States Geological Survey, or California Irrigation Management Information System weather station, such as http://scacis.rcc-acis.org/. [3] A precipitation event is one producing precipitation of ½ inch or more. [4] Pond sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.

2. Trickling Filter System Monitoring
i. Influent and Effluent Monitoring – At a minimum, influent and effluent constituent monitoring for the trickling filter system must be monitored as specified in Table 6.

Table 6. Influent and Effluent Monitoring for Trickling Filter Systems

INFLUENT
(IS-1)

INFLUENT
(IS-1)

EFFLUENT
(ES-1)

EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
pH units Grab Weekly Grab Weekly
Biochemical
Oxygen Demand,
5-Day
mg/L 24-hour
composite Quarterly 24-hr composite Monthly
Total Suspended
Solids mg/L 24-hour composite Quarterly 24-hr composite Monthly Settleable Solids ml/L Not
Required Not Required Grab Weekly
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
9 INFLUENT
(IS-1)

INFLUENT
(IS-1)

EFFLUENT
(ES-1)

EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
Total Nitrogen[2] mg/L Calculated Quarterly Calculated Monthly Nitrate (as N) +
Nitrite (as N) mg/L 24-hour composite Quarterly Grab Monthly Total Kjeldahl
Nitrogen (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Ammonia (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Total Dissolved
Solids mg/L 24-hour
composite Quarterly Grab Monthly
Chloride mg/L 24-hour
composite Quarterly Grab Monthly
Sodium mg/L 24-hour
composite Quarterly Grab Monthly
Sulfate mg/L 24-hour
composite Quarterly Grab Monthly
Boron mg/L Not
Required Not Required Grab Monthly
Carbonate mg/L Not
Required Not Required Grab Semiannually
Bicarbonate mg/L Not
Required Not Required Grab Semiannually
Calcium mg/L Not
Required Not Required Grab Semiannually
Potassium mg/L Not
Required Not Required Grab Semiannually
Magnesium mg/L Not
Required Not Required Grab Semiannually
[1] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.

IV. SLUDGE/BIOSOLIDS DISPOSAL MONITORING
The City of Santa Maria must report the handling and disposal of all sludge/biosolids generated at the Wastewater System. Records must include the date removed from the Wastewater System, name/contact information for the hauling company, the type and volume of waste transported, the disposal facility name and address, and copies of analytical data required by the entity accepting the waste. These records must be submitted as part of the annual monitoring report.

The City of Santa Maria must also monitor sludge/biosolids consistent with a Central Coast Water Board approved sludge management plan and in accordance with the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
10 requirements specified by the receiving party, including a regulated landfill and/or regulated composting facility.

If sludge/biosolids are not removed during the year, the City of Santa Maria must explain the absence of this monitoring in the annual report.

V. GROUNDWATER MONITORING
A. General Permit section V.A.2 provides two choices for compliance, effluent limitations, or groundwater monitoring.

In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent.

Option 1 is to comply with the effluent limits (refer to notice of applicability Table 7).

Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan (refer to notice of applicability Table 8).

Existing upgradient and downgradient groundwater monitoring wells are located within the percolated effluent mound at the Wastewater System. The current monitoring well network is not adequate for the assessment of upgradient background water quality and/or downgradient water quality trend for the City of Santa Maria Wastewater System (Fugro 2007)2.

By June 16, 2024, (with the time schedule compliance plan) the City of Santa Maria must notify the Central Coast Water Board of the city’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).

If the City of Santa Maria chooses Option 2 for any constituent, by October 16, 2024, the City of Santa Maria must:

1. Submit a groundwater monitoring workplan and preliminary hydrogeologic conceptual site model for Central Coast Water Board approval. At a minimum, the workplan must propose the installation of three shallow groundwater monitoring wells to establish groundwater gradient, groundwater flow velocity and direction, and evaluate downgradient groundwater quality influenced by the wastewater disposal. The number and location of the proposed groundwater monitoring well network must be on a scale sufficient to determine potential impacts and be sufficiently representative of groundwater conditions upgradient and downgradient of the permitted disposal/dispersal area. The groundwater 2 Hydrogeologic and Water Quality Review of Groundwater Conditions for the Wastewater Treatment Plant, Santa Maria, California. Fugro West, Inc. September 2007 MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
11 monitoring wells should not be installed prior to Central Coast Water Board approval of the groundwater monitoring workplan and preliminary hydrogeologic conceptual site model.

The groundwater monitoring wells must be installed within first encountered groundwater and in accordance with California Department of Water Resources Bulletin No. 74-81 and Supplement No. 74-90, California Water Code sections 13710 through 13755, and any local permitting requirements. The locations and top-of-casing elevations for the newly installed monitoring wells must be surveyed by a licensed land surveyor. The City of Santa Maria must install3 the Central Coast Water Board approved groundwater monitoring well network within 90 days of receiving Central Coast Water Board approval.

2. Once installed, all monitoring wells designated as part of the monitoring well network must be, at a minimum, sampled and analyzed as specified in Table 7 and the Central Coast Water Board approved sampling and analysis plan (see section VI.A.2.i of the General Permit).

Prior to sampling, depth to groundwater must be measured and groundwater elevations4 must be calculated. The monitoring wells must be purged of at least three well volumes and until measurements of the following parameters have stabilized (i.e., are reproducible within 10 percent): pH, temperature, dissolved oxygen, electrical conductivity, and turbidity. No-purge, low-flow, or other sampling techniques are acceptable only if they are approved in advance by the Central Coast Water Board and described in an approved sampling and analysis plan. Once the groundwater level in each of the wells has recovered sufficiently to ensure the collection of representative groundwater samples, a qualified individual (e.g., consultant, technician) trained in using proper sampling methods must recover samples using approved USEPA methods. Laboratories analyzing groundwater samples must be accredited by the State Water Board Environmental Laboratory Accreditation Program, in accordance with California Water Code section 13176, and must include quality assurance/quality control data with their reports.

The City of Santa Maria must provide monitoring well field sheets and report monitoring data, as described in Table 7, with each monitoring report.

3. Groundwater monitoring must include and must be consistent with Table 7 if Option 2 is chosen. Some constituents in Table 7 may be removed by the Central 3 Well installation must be supervised by a California licensed Civil Engineer or Professional Geologist. 4 The locations and top-of-casing elevations for the existing groundwater monitoring wells must be surveyed by a licensed land surveyor if not already completed at the time of installation.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
12 Coast Water Board if compliance for that constituent is chosen by the City of Santa Maria to be an effluent limitation.

Table 7. Groundwater Monitoring if Option 2 is Chosen
Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation [1] 0.01 ft amsl Calculated Quarterly Depth to Groundwater [1] 0.01 ft bgs Measurement Quarterly Gradient feet/feet Calculated Quarterly
Groundwater Flow Direction [2] degrees Calculated Quarterly Total Nitrogen[3] mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Total Dissolved Solids mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
Carbonate mg/L Grab Semiannually
Bicarbonate mg/L Grab Semiannually
Calcium mg/L Grab Semiannually
Potassium mg/L Grab Semiannually
Magnesium mg/L Grab Semiannually
pH pH Units Metered Quarterly
Dissolved Oxygen mg/L Metered Quarterly
Phenol [4] mg/L Grab Annual
Formaldehyde [4] mg/L Grab Annual
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
13 Constituent Units Sample
Type
Sampling
Frequency
Zinc [4] mg/L Grab Annual
[1] ft amsl denotes feet above mean sea level and ft bgs denotes feet below ground surface. [2] Calculations must be prepared by, or under the responsible charge of, a California licensed professional.
[3] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.
[4] Sampling required once every five years if not detected in initial sample.

4. Groundwater monitoring reports, workplans, and other technical reports that interpret groundwater data must be prepared and stamped by a California licensed civil engineer or professional geologist.

B. GROUNDWATER MONITORING PRIOR TO OCTOBER 16, 2024
Table 8. Groundwater Monitoring Prior to October 16, 2024 Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation 0.01 ft amsl Calculated Quarterly Depth to Groundwater 0.01 ft bgs Measurement Quarterly
Total Nitrogen mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
VI. REPORTING REQUIREMENTS
A. QUARTERLY AND ANNUAL MONITORING REPORTS
Quarterly and annual monitoring reports are due as described in Table 9.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
14 Table 9. Quarterly and Annual Monitoring Reporting
Report Monitoring Period Report Due Date
First Quarter Monitoring
Report January 1 to March 31 May 1
Second Quarter Monitoring
Report April 1 to June 30 August 1
Third Quarter Monitoring
Report July 1 to September 30 November 1
Fourth Quarter Monitoring
Report October 1 to December 31 February 1
Annual Monitoring Report January 1 to December 31 March 1 Annual Pretreatment
Program Report January 1 to December 31 March 1
State Water Board
Volumetric Annual
Reporting
January 1 to December 31 April 30

1. Quarterly Monitoring Reporting – At a minimum, the quarterly reports must include:
i. Results of all required monitoring in tabular format. ii. The results of any pollutant or parameter monitored more frequently than is required by this monitoring program. Values obtained through additional monitoring must be used in calculations as appropriate. iii. A comparison of monitoring data to the discharge specifications, applicable effluent limitations, disclosure of any violations of the notice of applicability and/or General Permit, and an explanation of any violation of those requirements. The City of Santa Maria must calculate 7-day averages, 30- day averages and 25-month rolling medians for select analytes when comparing monitoring data to applicable effluent limitations specified in the General Permit. Data must be presented in tabular format. iv. Copies of laboratory analytical report(s) and chain of custody form(s). v. An updated hydrogeologic conceptual site model with the groundwater monitoring reporting requirements based on new information generated from the monitoring well boring logs, groundwater elevation data, and water quality data.
vi. Copies of groundwater monitoring well field sheets with purge methods and data.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
15 2. Annual Monitoring Reporting – The City of Santa Maria must submit annual reports in compliance with Standard Provisions 20135, (and any updates to the Standard Provisions) Section C, General Reporting Requirements, Item 16 using the most recent annual report template provided by Central Coast Water Board.

The current annual report template can be found here:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf

3. Annual Pretreatment Program Report – Pursuant to California Code of Regulations, title 23, section 2233, subdivision (a), because the City of Santa Maria’s Wastewater System is designed to treat over five million gallons a day, the city must have and enforce an adequate pretreatment program approved by the Central Coast Water Board. The City of Santa Maria’s Pretreatment Program was approved by the Environmental Protection Agency (EPA) in 1982. The Pretreatment Program monitors compliance of permitted facilities and attempts to identify and reduce pollutants to both sanitary and stormwater collection systems.

On occasion, there may be a need to modify an existing pretreatment program, as identified by either the City of Santa Maria or the Central Coast Water Board.

These modifications may be driven by a variety of factors such as, but not limited to, a change in conditions at the Wastewater System, a recalculation of local limits (or reallocation of the maximum allowable industrial loading), changes to federal pretreatment regulations, or a change in the industrial user base discharging to the Wastewater System. Substantial modification is defined in title 40 Code of Federal Regulations (CFR) 403.18(b).

For substantial modifications, the City of Santa Maria must submit in writing to the Central Coast Water Board the rationale for the substantial modification, a detailed description of the proposed modification, and other documents considered necessary by Central Coast Water Board staff.

The City of Santa Maria must submit an annual Pretreatment Program report in accordance with title 40 CFR 403.12(i) that describes the City of Santa Maria’s pretreatment program activities, including activities of all participating agencies, if more than one jurisdiction is involved in the program. The report must include, at a minimum, the applicable required data in appendix A to 40 CFR part 127 which requires the following data to be added or updated annually:
i. Pretreatment program approval or modification date
5 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/docs/wdr_standard_provi sions_2013.pdf
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
16 ii. Pretreatment program modification type
iii. Industrial user type
iv. Significant industrial user subject to local limits v. Significant industrial user subject to local limits more stringent than categorical standards
vi. Significant industrial user wastewater flow rate
vii. Industrial user causing problems at the Wastewater System viii. Receiving resource conservation and recovery act (RCRA) waste ix. Receiving remediation waste
The report must also include a summary of changes to the City of Santa Maria’s pretreatment program that have not been previously reported to the Central Coast Water Board and any other relevant information requested by the Central Coast Water Board.

4. State Water Board Volumetric Annual Reporting – The City of Santa Maria must electronically certify and submit a summary of the monthly influent and effluent flow volume by April 30th of each calendar year via the State Water Board’s Internet GeoTracker database.6
The following information is required:
i. Monthly volume of wastewater collected and treated by the wastewater treatment plant (i.e., total monthly influent volume).
ii. Monthly volume of wastewater treated, specifying level of treatment, including treated wastewater discharged.
iii. If applicable, monthly volume of recycled water distributed, and annual volume of treated wastewater distributed for beneficial use in compliance with California Code of Regulations, title 22 use categories.

Additional information about volumetric annual reporting of wastewater and recycled water and the Recycled Water Policy is available at the Recycled Water Policy Volumetric Annual Reporting Website7.
6 See: https://geotracker.waterboards.ca.gov/
7 See: Volumetric Annual Reporting | California State Water Resources Control Board MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
17 B. NON-COMPLIANCE REPORTING:

The City of Santa Maria must notify and report to Central Coast Water Board noncompliance of limits related to pond freeboard, flow rate, bypass or overflow, and wastewater containment failure, pursuant to General Permit section VI.C.2.

C. ELECTRONIC GEOTRACKER SUBMITTAL
All monitoring reports must be provided electronically in a searchable PDF format, with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed.
https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater_permi tting/docs/transmittal_sheet.pdf
The City of Santa Maria must submit all reports/documents and laboratory analytical data to the State Water Board’s GeoTracker8,9 database consistent with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System-specific global identification number WDR100029526 at:
https://geotracker.waterboards.ca.gov/esi/login
For general questions, please contact the GeoTracker Help Desk at:

[email protected].

Table 10 summarizes all the GeoTracker electronic reporting requirements. Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.

Table 10. GeoTracker Electronic Submittal Information Data Requirements Electronic
Submittal Description of Action Action Frequency
8 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/docs/beginnerguide2.pdf 9 Additional information available at:
https://geotracker.waterboards.ca.gov/
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
18 Electronic
Submittal Description of Action Action Frequency
Reports and
Documents
Complete copy of all
documents including
monitoring reports (in
searchable PDF format) and
any other associated
documents related to the
Wastewater System.

Upload directly to
GeoTracker all
monitoring reports (in
searchable PDF
format) and any
other associated
documents.

On or before the due
dates required by this
General Permit and for
other documents when
required by the Central
Coast Water Board.

Laboratory
Data
All analytical data (including
geochemical data) in
electronic deliverable format
(EDF). This includes all
water, soil, and vapor
samples collected when
monitoring a discharge.

Upload, or direct
your California
ELAP-accredited
laboratory staff to
upload, all EDF
laboratory data
directly to
GeoTracker.

On or before the due
date of the required
monitoring report.

Depth to
Groundwater
Monitoring wells must have
the depth-to-water
information reported. Report
data only for wells defined as
permanent sampling points.

Upload depth-to-water information to
the GeoTracker
GEO_WELL file.

On or before the due
date of the required
monitoring report.

Boring Logs
and Well
Screen
Intervals
Boring logs must be prepared
by a registered professional
and submitted in PDF format
separately (not only as
attachments to reports).

Upload boring logs
(in searchable PDF
format) to
GeoTracker
GEO_BORE file
whenever a new
boring is drilled.

Every time a new
boring is drilled.

Field Points,
Location Data
(Geo XY)[1]
Name, classify, and identify
the location (latitude and
longitude) of all sampling
points. Monitoring wells must
be surveyed, influent and
effluent sample locations
must be identified on the
GeoTracker mapping tool
under “non-surveyed data.”
These data points are
required prior to laboratory
data uploads.

Upload the location
data (surveyed and
non-surveyed) to the
GeoTracker Geo_XY
file.

Every time a
permanent monitoring
point is established.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
19 Electronic
Submittal Description of Action Action Frequency
Elevation
Data
(Geo Z)[2]
Survey and mark the
elevation at the top of
groundwater well casings for
all permanent groundwater
wells. These points are
required prior to depth-to-water data uploads.

Upload the survey
data to the
GeoTracker GEO_Z
file.

One-time, for all
groundwater
monitoring wells.

Geo Map
Site layout, map of facilities,
Wastewater System including
treatment and disposal
area(s).

Upload the Site
layout PDF to the
GeoTracker site plan
file.

Year one and every
five years thereafter
and when the facilities
are modified.
[1] Geo XY required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data. The City of Santa Maria must also upload sample locations (e.g., influent and effluent samples) that are not defined as a permanent monitoring well and have not been surveyed by a licensed professional.
[2] Geo Z required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data.

VII. TECHNICAL REPORTS
The technical reports are due as described in Table 11.

Table 11. Technical Report Submittal Due Dates
Report Report Due Date
Operations and Maintenance Manual June 16, 2024
Climate Change Adaptation Plan June 16, 2025
Salt and Nutrient Management Plan Not Applicable
Time Schedule Compliance Plan June 16, 2024
Groundwater Monitoring Plan[1] October 16, 2024
[1] Required if the City of Santa Maria chooses Option 2 described in section V.A.

1. Operations and Maintenance Manual – In addition to the required components specified in Standard Provisions10 A.12 and A.28 (and any updates to the 10 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/do-cs/wdr_standard_provisions_2013.pdf MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
20 Standard Provisions) and General Permit section VI.A.2, the Operations and Maintenance Manual must contain the following components. Each component must contain an implementation schedule and identification of adequate funding to implement the component.
i. Sampling and Analysis Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sampling and analysis plan that meets the requirements specified herein. Anyone performing sampling on behalf of the City of Santa Maria must be familiar with the sampling and analysis plan. At a minimum, the sampling and analysis plan must contain the following:
a. A wastewater treatment process flow schematic with the monitoring locations labeled and scaled Wastewater System maps with treatment components, discharge locations (both treated wastewater and non-potable recycled water), monitoring locations, groundwater wells, storage locations (e.g., chemical, sludge, emergency overflow ponds), and buildings. If the City of Santa Maria needs to update Figure 1 to comply with this requirement, a copy of the updated process flow schematic will also be included with the annual report. b. Sample identification details in tabular format. The table must include the sample titles, GeoTracker field point information, sample description(s), and sampling frequencies.
c. Sample chain-of-custody procedures and documentation. d. Sample handling/preservation procedures.
e. A description of the analytical methods.
f. A description of sample containers, preservatives, and holding times. g. For water supply monitoring, a description of the location and method of data collection (e.g., onsite well sampling, use of consumer confidence report).
h. For groundwater monitoring, a description of the well purging and field methods.
ii. Sludge Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sludge management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the plan must describe the following:

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
21 a. An estimated volume/amount and quality of sludge and scum that will be generated.
b. How sludge, scum, and supernatant will be stored and disposed of to protect groundwater quality.
c. If sludge will be subject to further treatment, describe the treatment and storage requirements.
d. Procedures for cleaning of digesters or storage vessels and the treatment and disposal of the residuals. If drying of residuals is planned, describe how that will be performed to prevent nuisance odors, prevent vectors, and protect groundwater quality. iii. Wastewater Disposal Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a wastewater disposal management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the wastewater disposal management plan must include:
a. A description of the wastewater disposal area and a map denoting acreage.
b. Loading calculations based on flow volumes, applied acreage, and biochemical oxygen demand, salts (total dissolved solids, sodium, chloride, sulfate, boron), and nitrogen analytical results. c. A description of wastewater disposal and water quality protection practices.
iv. Spill Prevention and Emergency Response Plan –The City of Santa Maria’s Operation and Maintenance Manual must contain a spill prevention and emergency response plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. The spill prevention and emergency response plan must describe operation and maintenance activities to prevent accidental releases of wastewater and to effectively respond to such releases and minimize the environmental impact. At a minimum, the spill prevention and emergency response plan must address the following:
a. Operation and Control of Wastewater System - A description of the wastewater treatment equipment, operational controls, flow measurement and calibration procedures, and treatment system schematic including valve/gate locations.
b. Sludge Handling - A description of the sludge handling equipment, operational controls, and disposal procedures.
c. Collection System Maintenance - A description of collection system cleaning and maintenance, equipment tests, and alarm functionality tests to minimize the potential for wastewater spills originating in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
22 collection system or headworks. For collection systems subject to State Water Board Order WQ 2022-0103-DWQ, Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (or its replacement), reports prepared to comply with State Water Board Order WQ 2022-0103-DWQ satisfy this requirement.
d. Emergency Response - A description of emergency response procedures including for emergencies such as power outage, severe weather, flooding, or inadequate freeboard (for systems with wastewater treatment, storage, or disposal ponds or treated non-potable recycled water storage ponds). An equipment and telephone list for contractors/consultants, emergency personnel, and equipment vendors.
e. Finance - At a minimum, discuss current fees, projected fees, current budget for spill prevention and emergency response, projected budget for spill prevention and emergency response.
f. Notification Procedures - Coordination procedures with fire, police, Governor’s Office of Emergency Services (CalOES), Central Coast Water Board, and local county health department personnel. v. Training Records Log – The City of Santa Maria’s Operation and Maintenance Manual must contain updated training records logs that demonstrate the City of Santa Maria is complying with General Permit section VI.B.3.

2. Climate Change Adaptation –The Climate Change Adaptation Plan must, at a minimum, include the following components:
i. Hazards and Vulnerabilities – Identify climate change hazards, at a minimum accounting for the hazards listed below, applicable to the Wastewater System. Using up-to-date tools, data, and guidance from the State of California (e.g., Cal-Adapt11, Sea-Level Rise Guidance from Ocean Protection Council, reports from the Climate-Safe Infrastructure 11 Cal-Adapt is an online resource with downscaled climate project data. It provides users with projections and more detailed downloadable data supporting a range of needs and array of climate models and emissions scenarios. Cal-Adapt offers climate projections for the major stressors facing California, including the following: temperature averages and extremes, precipitation averages and extremes, sea-level rise, wildfires, and drought. The Governor’s Office of Planning and Research (OPR) recommends agencies use Representative Concentration Pathway (RCP) 8.5 for analyses considering impacts through 2050, because there are minimal differences between emissions scenarios during the first half of the 21st century.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
23 Working Group, the Climate Adaptation Planning Guide, and California Climate Assessment Regional Reports), assess the Wastewater System’s vulnerability to identified hazards that could cause reduction, loss, or failure of treatment processes and/or critical structures at the Wastewater System. Identify and justify the resources (e.g., models and tools, design parameters) used to inform identification of these hazards and vulnerabilities.
a. Sea Level Rise – Saltwater intrusion, flooding and inundation, and increased coastal erosion.
b. Precipitation Pattern Changes.

I. Drought – Decreased influent quantity and quality.

II. Peak Events – Flooding and increased influent quantity. c. Temperature fluctuations and extremes.
d. Increased wildfires.
e. Increased power outages.
ii. Resiliency Actions – Identify actions to build Wastewater System and operational resilience to identified vulnerabilities, accounting for options that minimize resource impacts.
iii. Adaptation Strategy – For Wastewater Systems with design flows over 1,000,000 gallons per day, develop and implement a strategy to complete resiliency actions, at a minimum encompassing the following:
a. Prioritization – Prioritized resiliency actions based on risks to water quality, but also accounting for costs and benefits.
b. Schedule and Milestones – Timeframes to complete prioritized resiliency actions and/or climate change hazard triggers to inform when the City of Santa Maria must implement actions. Milestones to complete critical steps for prioritized resiliency actions, designed to demonstrate measurable progress at a steady, or accelerated, completion pace over the established timeframes.
c. Financial Planning – Projected costs necessary to implement and sustain resiliency actions and strategy to procure funds. iv. Recycled Water Feasibility Plan – Dischargers with Wastewater System design flows over 1,000,000 gallons per day must include a recycled water feasibility plan.

The recycled water feasibility plan will assess the viability of using the Wastewater System’s treated wastewater effluent for beneficial reuse including, but not limited to the following:
a. Beneficial Reuse Options – Identification of reuse opportunities for the City of Santa Maria’s treated effluent that would achieve the highest beneficial impact and best uses possible of non-potable recycled MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
24 water. Include assessment of the following non-potable recycled water benefits identified in the State Water Board Recycled Water Policy:
providing safe alternatives to fresh water or potable water for approved uses; supporting sustainable groundwater and surface water uses with the intent of substituting use of treated effluent for use of fresh water or potable water; and diversifying community water supplies and mitigating for the impacts of climate change.12
b. Viable Users – Identification and viability evaluation of all potential users of the Wastewater System’s treated effluent associated with identified beneficial reuse options. The City of Santa Maria must demonstrate it engaged potential water purveyors and customers about the viability of reusing the Wastewater System’s treated effluent. c. Infrastructure Upgrades – Assessment of infrastructure needs to produce non-potable recycled water for identified beneficial reuses and convey non-potable recycled water to beneficial reuse locations. d. Fiscal Analysis – Cost estimates for identified reuse options, at a minimum including project development, construction, and long-term maintenance and lifecycle costs. This analysis shall also include identification and evaluation of the following: 1) funding options, including at a minimum, revenues from recycled water sales, grant and loan funding opportunities, and financing from other benefitting parties and 2) funding limitations.
e. Schedule and Milestones for Next Steps – Timeframes to assess the feasibility of identified beneficial reuse options and to identify proposed beneficial reuse options based on prioritized water recycling and reuse opportunities, feasibility assessments, and other factors identified by the City of Santa Maria.
f. Identification of implementation schedule and adequate funding to implement the plan.

3. Salt and Nutrient Management Plan – The City of Santa Maria is an active cooperating partner of the Santa Barbara County Integrated Regional Water Management (IRWM) Plan’s regional water management group. The regional water management group prepared and submitted an assessment of the Santa Maria Valley Groundwater basin to the Central Coast Water Board. The assessment concluded that the dischargers participating in the workgroup were in balance for salts and nutrients in 2013. A salt and nutrient management plan is 12 Water Quality Control Policy for Recycled Water, State Water Board, adopted December 11, 2018, page 1.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
25 currently not required while the City of Santa Maria participates in the Santa Barbara County IRWM regional water management group.

4. Time Schedule Compliance Plan - As set forth in General Permit sections V.A and VI.A.5, if the City of Santa Maria anticipates that additional time is needed to achieve compliance with the effluent limitations, the City of Santa Maria must prepare and submit for Central Coast Water Board review and approval, a time schedule compliance plan. At a minimum, the time schedule compliance plan must address the following:
i. Comparison of the current effluent quality to the effluent and groundwater limitations in General Permit Tables 3-6.
ii. Identification of the City of Santa Maria’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).
iii. A detailed description and chronology of efforts, since issuance of the notice of applicability, to reduce wastes.
iv. Justification of the need for additional time to achieve the effluent limitations in General Permit Tables 3-6.
v. A detailed time schedule of specific actions the City of Santa Maria will take to achieve the effluent limitations.
vi. A demonstration that the time schedule requested is as short as possible, considering the technological, operation, and economic factors that affect the design, development, and implementation of the measures that are necessary to comply with the effluent limitation(s).
vii. If the requested time schedule exceeds one year, the proposed schedule shall include interim requirements and the date(s) for their achievement. The interim requirements shall include both of the following:
a. Effluent limitation(s) for the pollutant(s) of concern. b. Actions, measurable milestones, and tangible products leading to compliance with the effluent limitation(s).

VIII. LEGAL REQUIREMENTS
The Central Coast Water Board’s requirements that the City of Santa Maria submit the technical and monitoring reports described in this monitoring and reporting program are made pursuant to section 13267 of the California Water Code. Failure to submit reports in accordance with schedules established by this General Permit and notice of applicability with attachments or failure to submit a report of sufficient technical quality to be acceptable to the Central Coast Water Board may subject the City of Santa Maria to enforcement action pursuant to section 13268 of the California Water Code. Pursuant to section 13268 of the Water Code, a violation of a request made pursuant to section MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
26 13267 may subject the City of Santa Maria to civil liability assessment of up to $1,000 per day in which the violation occurs.

The Central Coast Water Board needs the required information to ensure compliance with the notice of applicability and the General Permit. The City of Santa Maria is required to submit this information because it is subject to the General Permit and is responsible for the discharge.

The burden, including costs, of the reports bears a reasonable relationship to their need and the benefits to be obtained. The requirement for the reports is necessary to ensure compliance with the General Permit, notice of applicability, and monitoring and reporting program to protect water quality.

The City of Santa Maria must implement the above monitoring program on October 1, 2023. The Central Coast Water Board may rescind or modify this monitoring and reporting program at any time.

Ordered By:
for Matthew T. Keeling
Executive Officer
\\ca.epa.local\RB\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\Order 2020-0020\final\Santa Maria_MRP_ R3-2023-0032_final.docx Jennifer Epp Digitally signed by Jennifer Epp
Date: 2023.06.15 16:19:04
-07'00'
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX I TIME SCHEDULE COMPLIANCE PLAN

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan

TECHNICAL MEMORANDUM
Time Schedule Compliance Plan
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan

TECHNICAL MEMORANDUM
Time Schedule Compliance Plan
FINAL / October 2026
Digitally signed by Lydia A. Holmes
Contact Info: Carollo Engineers Inc.

Date: 2026.10.21 15:16:19-07'00'
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.21 18:18:03-07'00'

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Time Schedule Compliance Plan/TimeScheduleCompliancePlan.docx Contents
SECTION 1 INTRODUCTION 1

1.1 Background 1

1.1.1 Purpose of This Report 1
SECTION 2 COMPARISON OF EFFLUENT QUALITY TO EFFLUENT AND GROUNDWATER LIMITS 2

2.1 Effluent Quality 2

2.1.1 Carbonaceous Biochemical Oxygen Demand and 5-Day Biochemical Oxygen Demand Test 3

2.1.2 Total Suspended Solids 3

2.1.3 Settleable Solids 4

2.1.4 Total Nitrogen 4

2.1.5 Total Dissolved Solids, Sodium, Chloride, Sulfate, and Boron 5

2.2 Groundwater Quality 7
SECTION 3 IDENTIFICATION OF CHOICE OF COMPLIANCE LOCATION 11 SECTION 4 DESCRIPTION AND CHRONOLOGY OF EFFORTS SINCE NOTICE OF APPLICABILITY 12

4.1 Summary of Investigations 12

4.1.1 Sampling Plan and Data Collection 12

4.1.2 Process Modeling and Optimization Identification 13

4.1.3 Source Control Evaluation 14

4.1.4 Percolation Pond Investigations and Improvements 14

4.2 Further Investigation 15
SECTION 5 JUSTIFICATION OF NEED FOR ADDITIONAL TIME AND DETAILED SCHEDULE OF ACTIONS 15

5.1 Proposed Actions 15

5.2 Justification for Schedule 16

5.3 Detailed Time Schedule of Specific Actions 18
SECTION 6 DEMONSTRATION THAT TIME SCHEDULE IS AS SHORT AS POSSIBLE 18
SECTION 7 PROPOSED INTERIM LIMITS, ACTIONS, AND MEASURABLE MILESTONES 19

7.1 Proposed Interim Limits 19

7.2 Actions and Measurable Milestones 20

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Tables
Table 1 Comparison of Permit Limits and Current Effluent Concentrations 2 Table 2 Groundwater Quality Data (Average From 2018 to 2023) 8 Table 3 City of Santa Maria Proposed Interim WWTP Effluent Limits 19 Table 4 Proposed Time Schedule Tasks and Milestones 20
Figures
Figure 1 Comparison of Effluent CBOD and BOD₅ to NOA Limits 3 Figure 2 Comparison of Effluent TSS to NOA Limits 4
Figure 3 Comparison of Effluent Total Nitrogen to NOA Limit for Total Nitrogen 5 Figure 4 Comparison of Effluent TDS to NOA Limits 6
Figure 5 Comparison of Effluent Sodium, Chloride, and Sulfate to NOA Limits 6 Figure 6 Comparison of Effluent Boron to NOA Limits 7
Figure 7 TDS Values in the Groundwater Compared to NOA Limit 8 Figure 8 Sodium Values in the Groundwater Compared to NOA Limit 9 Figure 9 Chloride Values in the Groundwater Compared to NOA Limit 9 Figure 10 Sulfate Values in the Groundwater Compared to NOA Limit 10 Figure 11 Boron Values in the Groundwater Compared to NOA Limit 10 Figure 12 Total Nitrogen Values in the Groundwater Compared to NOA Limit 11 Figure 13 Timeline for Determining Approach for Interim and Final Limit Compliance 18 Figure 14 Timeline for Implementation of Project for Final Compliance 18

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
BOD₅ 5-day biochemical oxygen demand test
Carollo Carollo Engineers, Inc.

CBOD carbonaceous biochemical oxygen demand
CEPT chemically enhanced primary treatment
CEQA California Environmental Quality Act
City City of Santa Maria
COD chemical oxygen demand
mg/L milligrams per liter
mgd million gallons per day
mL/L milliliters per liter
NOA Notice of Applicability
PTF primary trickling filter
RWQCB Regional Water Quality Control Board
STF secondary trickling filter
TBD to be determined
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TN total nitrogen
TSCP Time Schedule Compliance Plan
TSS total suspended solids
VSS volatile suspended solids
WWTP wastewater treatment plant

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
SECTION 1 INTRODUCTION

1.1 Background
The City of Santa Maria (City), California treats domestic, commercial, and industrial wastewater from its service area which serves a population of more than 107,000. The treatment process includes primary clarifiers, trickling filters, secondary clarifiers, and then discharge of the treated wastewater to land via percolation ponds. This discharge is permitted by the Central Coast Regional Water Quality Control Board (RWQCB). In September 2020, the RWQCB adopted a General Waste Discharge Requirements Order (No. R3-2020-0020). The City enrolled in this General Order through submitting a notice of intent on August 5, 2022. The RWQCB issued a Notice of Applicability (NOA) to the City on June 16, 2023, which lays out specific requirements, effluent limitations, and the Monitoring and Reporting Program requirements. As part of the NOA, the City is required to develop a Time Schedule Compliance Plan (TSCP) if additional time is needed to comply with the new effluent limits. Per the NOA, the TSCP must address the following:

1. Comparison of the current effluent quality to the effluent and groundwater limitations in General Permit Tables 3 to 6.

2. Identification of the City’s choice for compliance for each constituent pursuant to General Permit Section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).

3. A detailed description and chronology of efforts, since issuance of the NOA, to reduce wastes.

4. Justification of the need for additional time to achieve the effluent limitations in General Permit Tables 3 to 6.

5. A detailed time schedule of specific actions the City will take to achieve the effluent limitations.

6. A demonstration that the time schedule requested is as short as possible, considering the technological, operation, and economic factors that affect the design, development, and implementation of the measures that are necessary to comply with the effluent limitation(s).

7. If the requested time schedule exceeds one year, the proposed schedule shall include interim requirements and the date(s) for their achievement. The interim requirements shall include both of the following:
a. Effluent limitation(s) for the pollutant(s) of concern. b. Actions, measurable milestones, and tangible products leading to compliance with the effluent limitation(s).

1.1.1 Purpose of This Report
The City will not be able to implement new treatment processes in time to comply with the final effluent limits by June 2025. Therefore, the purpose of this report is to address each of the items set out above.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
SECTION 2 COMPARISON OF EFFLUENT QUALITY TO

EFFLUENT AND GROUNDWATER LIMITS
This section lays out in more detail how the City’s effluent quality compares to the requirements of the NOA effluent and groundwater limits for each of the major constituents.

2.1 Effluent Quality
A summary of the current permit limits compared to the City’s effluent is shown in Table 1. As indicated in Table 1, the City will have issues complying with the 5-day biochemical oxygen demand test (BOD₅), total suspended solids (TSS), and total nitrogen (TN). Additionally, total dissolved solids (TDS) concentrations have been increasing. Each of these constituents are discussed in more detail below.

Table 1 Comparison of Permit Limits and Current Effluent Concentrations Constituent Units Interim Limits Through
June 16, 2025 Based on
General Order
No. R3-2010-0001
Final Limits as of
June 16, 2025 Based on
New General Order
No. R3-2020-0020
Average Effluent
2018 to 2023(1)
BOD₅(1) mg/L 60 30 44.4 CBOD(2,3)

70.1 BOD₅(2,3)
TSS(1) mg/L 60 30 38.6
Settleable Solids(1) mL/L 0.1 0.3(4) <0.1
TN(5) mg/L – 10 42
TDS(5) mg/L 1,000 1,000 884
Sodium(5) mg/L 180 230(6) 140
Chloride(5) mg/L 180 165 150
Sulfate(5) mg/L – 500 227
Boron(5) mg/L – 0.5 0.37
Notes:

CBOD - carbonaceous biochemical oxygen demand; mg/L - milligrams per liter; mL/L - milliliters per liter (1) Based on a 30-day average.
(2) Values shown in red indicate which constituents cannot comply with either the interim or final effluent limit. (3) The City historically measured CBOD rather than BOD₅ for compliance. CBOD value shown is an average of 2018 to 2023.

BOD₅ value is an average of 24 samples collected in fall of 2023 and early 2024. (4) The settleable solids limit shown in the NOA is not consistent with General Order No. R3-2020-0020. The NOA states effluent limits are 0.1 mL/L as a 30-day average while the General Order establishes limits as 0.3 mL/L as a 30-day average. The General Order value is shown above.
(5) Based on 25-month rolling median.
(6) The sodium limit shown in the NOA is not consistent with General Order No. R3-2020-0020. The NOA states effluent limits are 105 mg/L as a 25-month rolling median while the General Order establishes limits as 230 mg/L as a 25-month rolling median. The General Order value is shown above.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3

2.1.1 Carbonaceous Biochemical Oxygen Demand and 5-Day Biochemical Oxygen Demand Test
The City historically measured effluent using CBOD, as opposed to BOD₅. The NOA requires use of BOD₅.

Figure 1 shows the historical CBOD effluent values collected since 2018 compared to the interim and final NOA effluent limits. Recent data using BOD₅ is also shown for samples collected in fall 2023. Based on sampling conducted at the City’s wastewater treatment plant (WWTP), CBOD values are typically 45 percent of BOD₅ values. For this reason, as seen in Figure 1 that while the historical CBOD values are typically less than 60 mg/L, use of the BOD₅ method means that the effluent discharge cannot comply with the interim limit of 60 mg/L as a 30-day average, nor the final limit of 30 mg/L as a 30-day average.

Reduction of BOD₅ to reliably meet the lower final effluent limits will likely require additional treatment and/or transitioning away from trickling filters to activated sludge.

Figure 1 Comparison of Effluent CBOD and BOD₅ to NOA Limits

2.1.2 Total Suspended Solids
TSS has an interim limit of 60 mg/L and a final limit of 30 mg/L measured as a 30-day average. As shown in Figure 2, the WWTP effluent is normally under 60 mg/L but is not always able to comply with the 30 mg/L limit. The City is evaluating ways to improve TSS removal, but transitioning away from trickling filters to activated sludge would lead to a more stable secondary effluent discharge.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
Figure 2 Comparison of Effluent TSS to NOA Limits

2.1.3 Settleable Solids
The City’s effluent achieves both the interim and final limit of settleable solids of 0.1 mL/L.

2.1.4 Total Nitrogen
The NOA establishes that the effluent shall not exceed a TN limit of 10 mg/L as a 25-month rolling median. As shown in Figure 3, the sum of the nitrogen species (ammonia, nitrate, and nitrite) far exceeds the total limit of 10 mg/L. Reduction of TN will require new treatment processes as the existing facility was not designed for nutrient removal and is not easily modified to meet these nitrogen limits.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5
Figure 3 Comparison of Effluent Total Nitrogen to NOA Limit for Total Nitrogen

2.1.5 Total Dissolved Solids, Sodium, Chloride, Sulfate, and Boron For the protection of the Upper Guadalupe Groundwater Basin, the NOA establishes effluent limits for a number of compounds that are not typically removed by primary and secondary treatment, such as TDS, sodium, chloride, sulfate, and boron. All of these compounds are largely influenced by the source water quality used for the potable water supply. In the case of the City, water supply is a combination of local groundwater sources and imported State Water Project water (surface water from the delta). The compliance for these effluent limits are based on a 25-month rolling median. Because the treatment plant’s influent flow is more than 90 percent domestic in origin, and industrial discharges only account for about 4.2 percent of the influent salinity, the ability to comply with any of these constituents will largely depend on the quality of the drinking water supplies.

The final effluent limit for TDS is 1,000 mg/L, as shown in Figure 4 (solid blue line). Figure 4 also shows the 25-month rolling median of the historical effluent TDS values (dotted blue line) that comply most of the time with the new limit, with a few exceedances in 2022.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6
Figure 4 Comparison of Effluent TDS to NOA Limits
Figure 5 shows the historical effluent values for sodium, chloride, and sulfate, whose final effluent limits are 230 mg/L, 165 mg/L, and 500 mg/L, respectively, shown in solid colored lines. Again, compliance is based on a 25-month rolling median shown as dotted colored lines in Figure 5. As shown in Figure 5, effluent sodium is below the 230 mg/L limit and effluent sulfate is below the 500 mg/L limit, but chloride has had individual values in the past that exceeded the 165 mg/L limit. However, the 25-month rolling median for chloride values since mid-2019 meets the 165 mg/L limit.

Figure 5 Comparison of Effluent Sodium, Chloride, and Sulfate to NOA Limits

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 7
The effluent limit for boron is 0.5 mg/L, shown as the solid purple line. As shown in Figure 6, the 25-month rolling median (shown as a dotted purple line) of historical effluent boron levels is below

0.5 mg/L.

Figure 6 Comparison of Effluent Boron to NOA Limits

2.2 Groundwater Quality
In addition to specifying effluent limits, the NOA also establishes groundwater quality limits that are based on a 25-month rolling median. These limits are based on the Basin Plan water quality objectives for the Upper Guadalupe Groundwater Basin. The City can choose to either comply with limits for TDS, sodium, chloride, sulfate, boron, and TN in the effluent (limits discussed in the previous section) or in the groundwater. If the City chooses to comply with limits in the groundwater, the City would need to develop a detailed groundwater monitoring plan and program.

Table 2 summarizes the limits for groundwater quality as well as the City’s historical groundwater data from 2018 to 2023. As shown in the table, most of the constituents are currently meeting the groundwater quality requirements, with the notable exception of TN. The existing wastewater processes were not designed for nitrogen removal nor are they capable of removing nitrogen. As shown in Table 2, TN is the only constituent in the groundwater where the average of historical data exceeds the groundwater limit.

However, it is important to note that the well that is upgradient of the City’s percolation ponds has significantly higher TN levels than the downgradient wells, likely due to the extensive agricultural use of lands surrounding the wastewater treatment and disposal facilities.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 8
Table 2 Groundwater Quality Data (Average From 2018 to 2023) Constituent Limits Based on
General Order
No. R3-2020-0020(1)
Well 5H
(Upgradient)
UMW-1
(Downgradient)
DMW-1
(Downgradient)
DMW-2
(Downgradient)
TDS, mg/L 1,000 1,047 1,025 978 972
Sodium, mg/L 230 67 154 144 145
Chloride, mg/L 165 54 158 151 152
Sulfate, mg/L 500 386 214 215 235
Boron, mg/L 0.5 0.2 0.4 0.4 0.4
TN, mg/L 1.4 16.1(2) 7.0(2) 12.7(2) 17(2)
Notes:
(1) NOA groundwater limits based on 25-month rolling median. (2) Values shown in red indicate which constituents cannot comply with either the interim or final effluent limit.

Figures 7 to 12 show the groundwater sampling results from 2018 to 2023. While there are a few instances of individual sampling events higher than the limits, when using the 25-month rolling median the City is mostly in compliance with all groundwater limits except for TDS and TN.

Figure 7 TDS Values in the Groundwater Compared to NOA Limit

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 9
Figure 8 Sodium Values in the Groundwater Compared to NOA Limit Figure 9 Chloride Values in the Groundwater Compared to NOA Limit

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 10
Figure 10 Sulfate Values in the Groundwater Compared to NOA Limit Figure 11 Boron Values in the Groundwater Compared to NOA Limit

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 11
Figure 12 Total Nitrogen Values in the Groundwater Compared to NOA Limit SECTION 3 IDENTIFICATION OF CHOICE OF

COMPLIANCE LOCATION
While the City is able to comply for most constituents with either the effluent or groundwater limitations, the requirements for groundwater compliance are extensive. The Monitoring and Reporting Program established in the NOA states that the City’s current groundwater monitoring network is inadequate and requires that if the City chooses compliance in the groundwater they must comply with the following:
 Submit a groundwater monitoring work plan by October 16, 2024.  Submit a preliminary hydrogeologic groundwater model by October 16, 2024.  Propose installation of a minimum of three shallow groundwater monitoring wells and that these wells must be installed within 90 days of RWQCB approval.

Given this relatively short timeline to develop a groundwater monitoring plan and construct the monitoring wells, the City does not believe it can comply within the required timeline. Therefore, the City has elected to move forward with compliance in the effluent (Option 1) for all constituents.

Option 1 can be implemented right away as compared to Option 2 (groundwater compliance) which would require new infrastructure to be constructed, taking more time to implement. As the City continues to develop a plan and implementation process to meet the requirements of the General Order, it would like to reserve the right to utilize groundwater limitations (Option 2) in the future.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 12
SECTION 4 DESCRIPTION AND CHRONOLOGY OF

EFFORTS SINCE NOTICE OF APPLICABILITY
Following the issuance of the NOA in June 2023, the City has invested significant time and effort to improve its treatment performance and comply with the interim effluent limits. As part of this effort, Carollo Engineers, Inc. (Carollo) was engaged to develop a WWTP Master Plan to determine how best to achieve the interim and future limits, to estimate what new facilities will cost, and to lay out how long it will take for implementation. In addition, Carollo has analyzed the existing wastewater treatment performance to evaluate several alternatives for implementation to meet the interim effluent limits.

Detailed descriptions of efforts to comply with the new interim effluent limits are discussed in more detail in the following section. Efforts include the following:
 Sampling plan and data collection.
 Process evaluations and optimization identification.
 Source control evaluation.
 Percolation pond investigations.

4.1 Summary of Investigations

4.1.1 Sampling Plan and Data Collection
Historically, the City has regularly monitored the influent and effluent streams for CBOD, TSS, total Kjeldahl nitrogen (TKN), and ammonia-nitrogen. In addition to the two liquid streams, the City also monitors solids streams including raw sludge, digested sludge, and solids hauled from the drying beds.

However, to evaluate the treatment capabilities of each unit process, additional data was required. A comprehensive sampling plan for a period of seven consecutive days was recommended by Carollo to collect additional process data. In December 2023, the City executed the sampling plan and collected daily composite data for 17 different constituents (chemical oxygen demand [COD], BOD₅, CBOD, TSS, volatile suspended solids [VSS], TKN, etc.) at 20 different process locations. The data collected during the sampling event allowed for detailed evaluation of the processes. The following bullets summarize the key findings from the evaluation:
 The average influent COD to BOD₅ ratio and COD to VSS ratio is higher than the typical range for municipal wastewater. The higher ratio suggests an impact from industrial waste streams or other non-municipal components in the influent.
 The primary clarifiers and primary trickling filters (PTFs) seem to be performing well and within the typical performance range. However, the secondary trickling filter (STF) performance was below the typical range, suggesting there may be ways to improve performance.  Effluent BOD₅ data collected during the sampling event averaged around 66 mg/L. The City has also started sampling BOD₅ regularly since October 2023 and averages around 71 mg/L. Therefore, the

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 13
City will not be able to comply with the interim discharge limit of 60 mg/L and final discharge limit of 30 mg/L without improving the current performance and/or implementing new technologies.  Historically, the City has collected time-based composite samples for regular monitoring. However, flow-based composite samples are considered more representative and were, therefore, collected during the sampling event. These flow-based composite samples had lower BOD₅ results than the time-based composite sampling, indicating that the historical sampling method may be overestimating BOD₅. To get more representative data, the City is making an effort to implement flow-based sampling for regular monitoring.

4.1.2 Process Modeling and Optimization Identification
A steady state plant-wide process model was developed using BioWin version 6.2 (Envirosim) to help evaluate the current performance and develop near-term recommendations for process improvements and to establish unit process capacity. The model was utilized to evaluate recommendations for process improvements. Understanding that the TN limit cannot be met with the current treatment plant technologies, the focus has been on working towards achieving the interim limit for BOD₅ and TSS. The following are some of the potential opportunities recommended by Carollo based on the performance evaluation:
 Although the primary clarifiers’ performance is adequate and well within the typical performance, further improving performance could help reduce organic loading on trickling filters and improve effluent discharge. The process modeling analysis showed that with the improvement of primary clarifier performance, BOD₅ concentration in the final effluent will improve. Jar testing has been conducted to evaluate the impact of addition of ferric chloride at the primary clarifiers.  Secondary clarifier performance is also adequate and well within typical performance. However, adding polymer or coagulant at the secondary clarifiers will help reduce TSS and BOD₅ in the final effluent. The process modeling analysis showed that with the improvement of secondary clarifier performance, BOD₅ concentration in the final effluent will also improve. Jar testing has been conducted for evaluating the addition of various coagulants at the secondary clarifiers.  Distributor speed for PTFs and STFs: Spulkraft values were calculated for both PTFs and STFs which indicated that the distributors on trickling filters are rotating much faster than typical recommended rates. The trickling filter performance can be optimized by reducing the rotation speed of distributor arms. The rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units. The City is currently making progress on this alternative. Additionally, the City is also working on replacing distributor arms for one of the PTFs which has reached the end of its useful life.
 Tertiary filters: The addition of tertiary filtration would remove suspended solids from secondary effluent resulting in reducing both TSS and BOD₅ in the final effluent. Particle removal is achieved by passing wastewater through a filtering media. While the City does not currently have tertiary filtration, they are investigating the costs and feasibility of bringing in temporary filtration to help improve the final effluent quality.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 14

4.1.3 Source Control Evaluation
Due to the City’s inability to comply with the interim and final limits for BOD₅, TSS, and TN, as well as uncertainty about consistently meeting TDS requirements, a review of the City’s pretreatment program records was conducted to evaluate if industrial or septage discharges are contributing to elevated influent concentrations. Findings included the following:
 On average, septage discharges account for 2.3 percent of BOD₅ loading to the WWTP influent.

However, considering that septage deliveries are only accepted during business hours, the septage BOD₅ loading ranges from 2 to 9 percent of the influent loading during those hours. Even at these higher percentages during business hours, the septage loads were not considered a significant contribution to the overall BOD₅ concentration in the treated effluent from the WWTP.  Industrial discharges monitored as part of the City’s pretreatment program are 3.7 percent of the BOD₅ and 1.5 percent of the TSS loading to the WWTP influent. TN discharges from the industries are not currently tracked by the City. Due to the agricultural activity in Santa Maria, the industrial users discharge more in the summer and can reach discharges of 7 percent of BOD₅ and 2.6 percent of TSS loading to the WWTP influent. But, even at these levels, industrial discharges were not considered a significant contribution to the overall loading to the WWTP influent.  From 2019 to 2023, average TDS concentrations from individual significant industrial users remained well below their 1,800 mg/L local limit. Monthly effluent concentrations range from 700 to 1,600 mg/L of TDS. When compared with the effluent limits, this results in a combined contribution of 4.2 percent of the influent load from all the industrial dischargers. Therefore, industrial discharges are not considered a significant contribution to the overall loading of TDS to the WWTP.

4.1.4 Percolation Pond Investigations and Improvements
The NOA limits the disposal of effluent to the percolation ponds at 8 million gallons per day (mgd) based on information the City provided to the RWQCB regarding pond capacity. The City is currently investigating the pond capacity further and looking for ways to improve performance, including developing a water balance, performing geological and hydrogeological sampling and testing, and developing recommendations for improved percolation. The City submitted a letter request to the RWQCB on April 10, 2024, proposing to re-establish pond capacity on the southeast portion of the WWTP to accommodate retention and percolation of additional effluent from the infiltration/inflow generated from the recent back-to-back wet winters on the Central Coast, to provide some redundancy in similar weather conditions in the future, and to complement with additional storage the WWTP’s pond maintenance and performance evaluation currently being performed by the City’s consultant team. The request included details on approximate sizing and location of the three re-established percolation ponds.

The Master Plan (under development) will also identify improvements needed for disposal in the future including pond maintenance/rehabilitation and potentially new percolation pond development to meet the growth demands of the City.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 15

4.2 Further Investigation
Based on the discussion above, the following are the potential alternatives and considerations for interim compliance that need further investigation by temporary trials before finalizing the alternatives for full-scale implementation:
 Tertiary filter piloting.
 Coagulant addition at secondary clarifiers.
 Ferric chloride addition at primary clarifiers.
 TDS source water study.
 Percolation pond capacity and improvements.

Each of these additional investigations are discussed in greater detail in the next section.

SECTION 5 JUSTIFICATION OF NEED FOR ADDITIONAL

TIME AND DETAILED SCHEDULE OF ACTIONS
The approach for both interim and final compliance has many steps and therefore will take time. The City has already hired a consultant (Carollo) recognizing help is needed to investigate alternatives for compliance and that a comprehensive plan needs to be developed.

5.1 Proposed Actions
Based on the discussion above, the following are the proposed actions that need further investigation before finalizing an alternative for full-scale implementation:
 Tertiary filters: The City is evaluating whether temporary tertiary filters could help meet compliance in the near term. Investigations have shown that filtration of the secondary effluent may reduce the BOD₅ to below the interim limits. The City is evaluating logistics and seeking pricing to rent a 1-mgd pilot tertiary filter system that can be installed at the WWTP to confirm the viability of this approach.

The concept will be to operate the pilot for approximately four to five months to establish/determine the following:
» Filter performance criteria and the filterability of the secondary effluent. » The need for chemicals to assist with filtration.
» BOD₅ and TSS removal efficiency.
» Filter backwash frequency and flow.
» Impacts of backwash water on the existing solids handling facilities.

If the testing is successful, then the next step would be to determine the scalability, pricing, and approach for a more permanent facility that would treat all or part of the secondary effluent to meet the interim limits for BOD₅ and TSS.
 Coagulant addition at secondary clarifiers: Several rounds of jar testing have been conducted by Carollo to determine the type and optimum dosage for coagulant addition upstream of the secondary clarifiers. Based on the jar testing results there may be potential for water quality improvement. If the

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 16
tertiary filtration work, described above, is not successful, the City may conduct a trial test by adding coagulant to one of the clarifiers to assess its effectiveness. The addition of coagulant at secondary clarifiers is complicated for the City’s plant as there are significant return flows back into the plant.

This may have potential detrimental impacts to the trickling filter performance and other processes or require additional modifications to the treatment regime. It is anticipated that it will take approximately six months to set up and conduct such tests to determine if it is feasible to implement coagulant addition full scale at the secondary clarifiers.  Ferric chloride addition at primary clarifiers: Several rounds of jar testing have also been conducted by Carollo to determine the optimum dosage for the addition of ferric chloride upstream of primary clarifiers. Jar testing using three different coagulants was performed and ferric chloride performed best. The process model that Carollo developed for the existing plant was used to simulate the impact of implementing chemically enhanced primary treatment (CEPT). The model results show there is potential to reduce the BOD₅ concentration in the effluent stream to below the interim limits.

However, there are uncertainties about the impacts of ferric chloride addition on the other treatment processes. In addition, this approach is expected to have the highest costs for chemicals. Accordingly, since the primary clarifiers are already performing within expected values, the City is focusing on other improvement options described above. However, if the tertiary filtration and coagulant addition at the secondary clarifiers are not successful, a pilot test of CEPT could be developed to add coagulant to the primary clarifiers. It would take at least four to six months to implement such a pilot test.  TDS source water study: With the historical TDS data showing an increasing trend in concentrations and the 25-month rolling historical median showing a few values exceeding the new limit, the City will do an evaluation of the TDS in its source water to determine if the cause of the increases is due to conservation, contributions through use (wastewater), and/or use of water softeners. The City will also explore options for blending of supplies or implementing a self-regenerating softener ban to determine if any of these actions would help reduce TDS in the effluent. The study will identify the increase in TDS from source water to wastewater influent (human additions) and identify if an “intake credit” is an applicable regulatory approach. It is anticipated that this study would take one year to complete.
 Percolation pond capacity and improvements: As part of planning for future expansion and growth within the City, an important aspect is understanding the capacity of the existing percolation ponds.

The ongoing study and water balance calculations (part of the Master Plan) will identify capacity and near-term improvements needed to sustain and/or improve performance. It will also help identify the long-term disposal needs for the Master Plan.
 Master Plan: The City has already committed to completing a Master Plan to lay out the needed improvements for long-term wastewater treatment to meet the final effluent limits. This Master Plan development effort is already underway and includes data collection and review, flow and load projections, condition assessment, regulatory assessment, treatment process performance and capacity assessment, evaluation of liquid and solids alternatives (including reuse and energy management), capital improvement plan development, and financial planning.

5.2 Justification for Schedule
The first step is the evaluation of interim compliance options and the investigations into these options as discussed above. These investigations and pilots will be carried out in a stepwise process so that the

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 17
improvements from each specific action can be assessed before trying another improvement option. The stepwise process also reduces the risk that multiple, significant changes in the wastewater treatment process may have unintended, negative consequence on effluent discharge.

Task 1 includes ongoing optimization of the existing plant performance and all the investigations and piloting for meeting the BOD₅ and TSS interim limit of 60 mg/L. This task includes the current ongoing effort on optimizing plant performance through rehabilitation and reducing the speed of distributor arms for both PTFs and STFs (shown as Task 1a in Figure 13). Following completion of the existing plant optimization, piloting tertiary filtration will be the next step (shown as Task 1b in Figure 13). The tertiary pilot will take time to get into place and needs to run for several months. If successful, a larger scale filter system could be implemented. If tertiary filtration pilot testing is unsuccessful, then the other approaches will be tested for implementation (Tasks 1c and 1d for coagulant addition to the secondary and primary clarifiers) in a sequential order to determine if the new process is working prior to proceeding with the next step. Since the City’s peak flows and loads are during the summer months due to food processing, it is important for any pilot testing to include the summer months. The need for summer testing of any option, paired with the need for several months of operations and the need to only change one parameter at a time to determine impact of the change, means that Task 1 will take approximately a year and a half. Following completion of each of these Task 1 studies, the City will meet with the RWQCB to discuss an appropriate approach for interim compliance, including potential capital improvements and permit modifications, if needed.

In Task 2, the City will also begin a study on TDS in the source water to investigate the increasing concentrations of TDS in the influent. As discussed above, it is expected that this study would take approximately one year to complete. The study would be started after RWQCB approval of this TSCP. It is anticipated that this study will require discussions with the RWQCB regarding implications of findings on the permit and if regulatory solutions are viable.

Task 3 includes the ongoing percolation pond water balance and hydrogeologic/geologic study that will continue to develop near-term improvement recommendations. This work is being conducted as part of the ongoing Master Plan and is expected to be completed by the end of 2024.

In parallel to the additional investigations and pilot studies, the Master Plan is being developed to identify improvements for long-term wastewater treatment to meet the final effluent limits (Task 4). Because the Master Plan effort is a large, comprehensive evaluation of the wastewater system, it is not expected to be completed until the end of 2025. When the Master Plan is near completion, a Program Strategy and Execution Plan for project implementation delivery will be developed (Task 5) which will include a more detailed implementation schedule. Task 5 will also be completed at the end of 2025.

Once the Master Plan and Program Strategy and Execution Plan are completed, the City will begin design (Task 6) on the required wastewater improvement projects to meet the final effluent limits. It is anticipated that a large capital project to improve effluent BOD₅, TSS, and TN will take approximately two and a half years to design and up to four years to construct (Task 7). Therefore, the final effluent compliance project will not be online and operating until the end of 2033.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 18

5.3 Detailed Time Schedule of Specific Actions
Figure 13 shows the time schedule of the specific actions that have been described in the section above.

These tasks are expected to be completed by the end of 2025.

Figure 13 Timeline for Determining Approach for Interim and Final Limit Compliance Figure 14 shows the overall timeline for implementing a WWTP improvement project to meet final effluent limits.

Figure 14 Timeline for Implementation of Project for Final Compliance SECTION 6 DEMONSTRATION THAT TIME SCHEDULE IS

AS SHORT AS POSSIBLE
The schedule presented in Figure 14 is the shortest timeline possible given the need to plan, design, and construct major improvements to meet the final effluent limits, which will require the City to move away

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 19
from a trickling filter only secondary treatment technology and instead move to a treatment process that can both reduce effluent BOD₅/TSS and nitrify/denitrify to meet TN requirements. Likely processes include moving to an activated sludge process or adding additional nitrification/denitrification processes following the existing treatment facilities. The Master Plan will evaluate treatment options, including costs and time to implement, and will develop recommendations for implementation to meet the final effluent limits. This Master Plan and the resulting WWTP improvement project will require a significant investment of City staff time and budget. Therefore, it is prudent to develop a thorough plan before starting an implementation project, hence the two years of master planning shown in Figures 13 and 14. The improvement project costs are likely to be in the hundreds of millions for a facility of this size. Therefore, the design and construction will be lengthy. The timelines shown in Figure 14 are based on designs and construction timelines of similar facilities.

SECTION 7 PROPOSED INTERIM LIMITS, ACTIONS, AND

MEASURABLE MILESTONES
As demonstrated in the discussion above, planning, designing, and constructing a wastewater treatment facility that can meet the final effluent limits will require time. The City will continue its efforts to improve effluent quality with the goal of meeting interim limits. However, because the TN limits cannot be met without major modifications and upgrades to the WWTP, the City requests that the interim limits laid out in the NOA be extended until the end of 2033 when the WWTP improvement project will come online.

7.1 Proposed Interim Limits
The interim limits proposed are shown in Table 3 for the constituents that are likely to need interim limits longer than through June 16, 2025, as provided in the NOA. The proposed interim limits for BOD₅ and TSS are the same as the interim limits provided in the NOA, which were based on the effluent limits in the previous permit Order No. R3-2010-0001. While the NOA did not establish interim limits for TN, since the City cannot achieve the new limits by June 16, 2025, interim limits for TN are needed. The proposed TN interim limit shown in Table 3 is based on the 95th percentile value of effluent data collected on a quarterly basis from 2018 through 2023. Alternatively, the maximum observed value of 50 mg/L could also be used as the interim limit for TN.

Table 3 City of Santa Maria Proposed Interim WWTP Effluent Limits Constituent Units Proposed Interim Interim Dates
BOD₅ mg/L 100 (daily maximum)
60 (30-day average)
Until June 2033
TSS mg/L 100 (daily maximum)
60 (30-day average)
Until June 2033
TN mg/L 49.4 (25-month rolling median) Until June 2033

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 20

7.2 Actions and Measurable Milestones
As presented earlier, the City is proposing a phased approach that includes investigations and determination of the most suitable option for compliance. This measured response recognizes the high costs of implementing treatment options and a commitment to identifying a program that best serves the ratepayers’ needs while achieving the intent of the General Permit.

Table 4 lays out the series of tasks and milestones that the City is proposing to bring the WWTP into compliance with the new permit requirements.

After completion of Tasks 1, 2, 3, 4, and 5, it is recommended that the City meet with the Central Coast RWQCB to discuss the next steps and the refinement of the implementation timeline. Meetings with the RWQCB will also be held at several points during Task 1 to discuss results.

Table 4 Proposed Time Schedule Tasks and Milestones
Task/Milestone Dates Description/Purpose
Central Coast RWQCB accepts
TSCP
TBD Establish interim and final limits, and lay out a plan and timeline for compliance.

Task 1 - Studies for Interim
Compliance for BOD₅ and TSS
5/2024 - 10/2025 The City will study potential solutions for interim limit compliance including modification of trickling filters, addition of temporary tertiary filtration, and coagulant addition to secondary and/or primary clarifiers.

Milestone 1 12/2024 Meet with RWQCB to discuss Tertiary Pilot results.

Milestone 2 8/2025 Meet with RWQCB, if needed, to discuss Secondary Clarifier Coagulation Pilot results.

Milestone 3 12/2025 Meet with RWQCB to discuss summary of Task 1 investigations, results of changes, and plan of action, if needed.

Task 2 - TDS Source Water Study 9/2024 - 9/2025 The City will conduct a study to investigate source water TDS including evaluating different sources, if increases in TDS are due to conservation or water softeners, and if blending supplies can meet objectives. The study will also consider if softener bans (addressing human added TDS) can be used
to meet the effluent limits.

Milestone 4 9/2025 Submit TDS source water study to RWQCB.

Task 3 - Percolation Pond
Investigation
1/2024 - 12/2024 The City will conduct a study to investigate percolation pond water balance, geology/hydrogeology, and capacity.

Recommendations for improvements will be developed.

Milestone 5 12/2024 Submit percolation pond study to RWQCB.

Task 4 - Master Planning for
Long-Term Improvements
1/2024 - 12/2025 Develop Master Plan to identify needed WWTP improvements to comply with NOA final effluent limits.

Milestone 6 12/2025 Notify RWQCB of completion of Master Plan and meet to discuss recommendations.

Task 5 - Program Strategy and
Execution Plan
6/2025 - 12/2025 Develop strategy and execution plan for implementing the recommended project from the Master Plan. Will include
delivery method and revised implementation timeline.

Milestone 7 12/2025 Submit new implementation schedule to RWQCB.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 21
Task/Milestone Dates Description/Purpose
Task 6 - Procure Team, Design and
CEQA of WWTP Improvement
Project
1/2026 - 1/2029 The City will begin design and CEQA environmental review of recommended improvements following completion of Tasks 4 and 5.

Milestone 8 1/2029 Notify RWQCB of design completion and intent to construct.

Task 7 - Bid and Construct WWTP
Improvement Project
2/2029 - 8/2033 Bid and construct WWTP improvement project. Commission and operate upgraded WWTP to meet new effluent limits.

Milestone 9 9/2033 Notify RWQCB of completion of construction and compliance with final effluent limits.

Notes:

CEQA - California Environmental Quality Act; TBD - to be determined VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX J GROUNDWATER MONITORING
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-1
The groundwater monitoring program results from January 2018 through October 2023 are shown in Figures J.1 through J.7. All nitrate concentrations measured at the Background Well (5H) were above the Primary Maximum Contaminant Limit of 10 milligrams per liter (mg/L) while all concentrations measured in the monitoring wells were below background concentrations. The average effluent concentration was <0.2 mg/L. All groundwater concentrations were above the median total nitrogen groundwater objective for the Upper Guadalupe Sub-Area Basin of 1.4 mg/L. Total nitrogen concentrations in the monitoring wells were measured above background concentrations 18 times, and the average effluent concentration was 43 mg/L.

All groundwater concentrations were below the median sulfate groundwater objective of 500 mg/L (with one exception for the background well in 2020), and all concentrations in the monitoring wells were below background concentrations. The average effluent concentration was 196 mg/L. All background concentrations were below the median chloride groundwater objective of 165 mg/L, but concentrations measured in the monitoring wells were greater than 165 mg/L nine times. The average effluent concentration was 156 mg/L.

All groundwater concentrations were below the median boron groundwater objective of 0.5 mg/L, but all concentrations measured in the monitoring wells were greater than background results. The average effluent concentration was 0.35 mg/L. All groundwater concentrations were below the median sodium groundwater objective of 230 mg/L, but all concentrations measured in the monitoring wells were greater than the background concentrations. The average effluent concentration was 145 mg/L.

Most groundwater concentrations were above the median total dissolved solids groundwater objective of 1,000 mg/L, and recent monitoring well concentrations were greater than background results. The average effluent concentration was 844 mg/L.

Figure J.1 Groundwater Monitoring Wells - Nitrate
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-2
Figure J.2 Groundwater Monitoring Wells - Total Nitrogen Figure J.3 Groundwater Monitoring Wells - Sulfate
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-3
Figure J.4 Groundwater Monitoring Wells - Chloride
Figure J.5 Groundwater Monitoring Wells - Boron
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-4
Figure J.6 Groundwater Monitoring Wells - Sodium
Figure J.7 Groundwater Monitoring Wells - Total Dissolved Solids 0 200
400
600
800
1000
1200
1400
10/8/19 4/25/20 11/11/20 5/30/21 12/16/21 7/4/22 1/20/23 8/8/23 Concentration (mg/L)
Total Dissolved Solids
25-Month Rolling Median (1,000 mg/L)
Background Well (5H)
UMW-1
DMW-1
DMW-2
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX K TDS SOURCE WATER IMPROVEMENT
STUDY

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TDS Source Water Improvement Study
September 2025 / FINAL

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TDS Source Water Improvement Study
September 2025 / FINAL
Digitally signed by Lydia A. Holmes
Contact Info: Carollo Engineers Inc.

Date: 2026.10.21 15:19:31-07'00'

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/TDS Source Wtr Imprvmnt Study/TDS Source Water Improvement Study.docx Contents
SECTION 1 INTRODUCTION 1

1.1 Background and Purpose 1

1.2 Approach 3

1.3 Data Collection and Review 3
SECTION 2 WATER SUPPLY 3
SECTION 3 WATER QUALITY ANALYSIS 5

3.1 Groundwater Water Quality Data 5

3.2 State Water Project Quality Data 6

3.3 Blended Water Quality Data 6

3.4 Industrial Discharge Water Quality Data 7

3.5 Wastewater Quality Data 9

3.5.1 Septage Water Quality Data 9
SECTION 4 SALT CONTRIBUTION 11

4.1 Source Salt Contributions 11

4.1.1 Comparison of Conservation on Wastewater Treatment Plant Influent 12

4.1.2 Comparison of Source Water Salt Contributions 13

4.1.3 Water Softener Regulations 13

4.1.4 Industrial Discharge Regulations 15

4.1.5 Septage Total Dissolved Solids 16
SECTION 5 ALTERNATIVES 16

5.1 Overview 16

5.1.1 Source Water Supplies 17

5.2 Option 1: Blending 20

5.2.1 Removal of Well 9 From Stream 20

5.2.2 Removal of all State Water Project Water 20

5.2.3 Installation of Packers 20

5.2.4 Summary 21

5.3 Option 2: Reverse Osmosis at Blending and Disinfection Facility 22

5.3.1 Reverse Osmosis Sizing Assumptions 22

5.3.2 Reverse Osmosis at Blending and Disinfection Facility 23

5.4 Option 3: Reverse Osmosis at Wastewater Treatment Plant Effluent 25 SECTION 6 SUMMARY AND RECOMMENDATIONS 28

6.1 Summary of Findings and Recommendations for Compliance 28

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Appendices

APPENDIX A GROUNDWATER QUALITY

APPENDIX B SWP WATER QUALITY - POLONIO PASS AND BLENDING AND DISINFECTION FACILITY

APPENDIX C WASTEWATER QUALITY DATA

APPENDIX D SUMMARY OF LOADING INTO THE WWTP FOR ALL CONSTITUENTS

APPENDIX E SANTA MARIA MUNICIPAL CODE REGARDING WATER SOFTENERS

APPENDIX F SIGNIFICANT INDUSTRIAL DISCHARGER TDS CONCENTRATIONS OVER TIME Tables
Table 1 Comparison of TDS Permit Limits and Current Effluent Concentrations 1 Table 2 Historical Total Water Rights and Supplies Used 3 Table 3 Groundwater Wells Water Quality Data 5
Table 4 SWP Water Quality Data 6
Table 5 Santa Maria Blended Water Quality Data 7
Table 6 TDS Concentrations at the WWTP Effluent Point 9 Table 7 Santa Maria Septage Flow Contributions From Eight Major Haulers 10 Table 8 Santa Maria Septage TDS Concentrations 10
Table 9 Sources of TDS Loading into WWTP 11
Table 10 Comparison of Source Water Blends for TDS 13
Table 11 Loading Limit Calculation 16
Table 12 Current Groundwater Well Capacities 17
Table 13 Packer Installation Dates 21
Table 14 Effect of Blending Strategies on WWTP Effluent Concentrations 21 Table 15 RO Analysis Assumptions - Blending and Disinfection Facility 23 Table 16 Required RO Sizing for Source Water 24
Table 17 Blending and Disinfection Facility RO Planning Level Cost Estimate (2025 Dollars) 24
Table 18 RO Analysis Assumptions 25
Table 19 Required RO Sizing for WWTP Effluent 26
Table 20 WWTP RO Planning Level Costs (2025 Dollars) 27 Figures
Figure 1 TDS Concentrations in WWTP Effluent - 2018-2024 2 Figure 2 City Drinking Water Source Makeup 4
Figure 3 Total Supplied Water 4
Figure 4 TDS Concentration Trends - Groundwater Wells 6 Figure 5 TDS Concentration Trends - Industrial Dischargers 8 Figure 6 WWTP TDS Loading and Flow 12
Figure 7 Local Limits Development Guidance - Equation 6.1 15 Figure 8 Locations of Existing Water Production Facilities and Pipelines 18 Figure 9 Option 2 Layout - RO at the Drinking Water Facility 23 Figure 10 Option 3 Layout - RO at the WWTP 26

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AFY acre-feet per year
CaCO3 calcium carbonate
Carollo Carollo Engineers
City City of Santa Maria
DWR Department of Water Resources
EPA Environmental Protection Agency
General Permit General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems With Flows Greater Than 100,000 Gallons per Day gpd gallons per day
gpm gallons per minute
MAHL maximum allowable headworks loading
MF microfiltration
mg/L milligrams per liter
mgd million gallons per day
N/A not applicable
NOA Notice of Applicability
ppd pounds per day
RO reverse osmosis
RWQCB Regional Water Quality Control Board
SIU significant industrial user
Study TDS Source Water Improvement Study
SWP State Water Project
TDS total dissolved solids
TSCP Time Schedule Compliance Plan
UF ultrafiltration
WWTP Santa Maria Wastewater Treatment Plant

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
SECTION 1 INTRODUCTION

1.1 Background and Purpose
The City of Santa Maria (City) owns and operates the Santa Maria Wastewater Treatment Plant (WWTP).

The WWTP is a trickling filter plant that is currently treating around 7 million gallons per day (mgd). The WWTP provides secondary treatment and accepts septage from domestic, industrial, and commercial users.

In September 2020, the Central Coast Regional Water Quality Control Board (RWQCB) adopted a General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems With Flows Greater Than 100,000 Gallons per Day (General Permit). The City was enrolled into the General Permit through a Notice of Applicability (NOA) in June 2023, which establishes updated effluent discharge requirements for the City, including limits to protect the Upper Guadalupe Groundwater Basin for total dissolved solids (TDS), sodium, chloride, sulfate, and boron. Since the City was unable to meet the new effluent limits for a number of constituents, they prepared a Time Schedule Compliance Plan (TSCP) outlining the City's plan and timeline to come into effluent permit compliance.

While the limits to protect the groundwater basin are established as 25-month rolling medians, in reviewing historical data, it became clear that the TDS rolling median would have exceeded the new limit at times, as shown on Figure 1. Therefore, as part of the TSCP, the City proposed the creation of this TDS Source Water Improvement Study (Study) in order to analyze the water and wastewater quality within the City's service area and use that data to evaluate options for WWTP permit compliance for TDS.

The updated permitted limits for TDS and TDS constituents compared to the average effluent quality of the WWTP from 2018 to 2024 are shown in Table 1.

Table 1 Comparison of TDS Permit Limits and Current Effluent Concentrations Constituent Units
Final Limits as of June 16, 2025
Based on New General Order
No. R3-2020-0020
Average Effluent
2018 to 2024(1)
Range of Effluent Data
2018 to 2024
(Minimum to Maximum)
TDS mg/L 1,000(1) 890 590 - 1,128
Sodium mg/L 230(2) 139 120 - 160
Chloride mg/L 165 149 110 - 197(3)
Sulfate mg/L 500 224 69 - 340
Boron mg/L 0.5 0.37 0.24 - 0.47
Notes:
mg/L - milligrams per liter
(1) Based on 25-month rolling median.
(2) The Sodium limit indicated here is consistent with General Order No.R3-2020-0020. However, it differs from the NOA issued to the City of Santa Maria. The NOA states the effluent limit for sodium as 105 mg/L on a 25-month rolling median. The City contends that 230 mg/L is the correct value for the sodium limit based on the General Order and requested in the City’s letter to the RWQCB dated July 13, 2023, that the RWQCB correct the City’s NOA. (3) The City’s effluent chloride levels have been below 165 since mid-2019.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
Figure 1 TDS Concentrations in WWTP Effluent - 2018-2024 Table 1 illustrates that the WWTP effluent concentrations for TDS, sodium, chloride, boron, and sulfate remain below the final limits provided under the General Permit. However, there is a discrepancy in the sodium limit between the General Permit and the NOA. The General Permit lists a sodium limit of 230 mg/L for the Upper Guadalupe Groundwater Basin, whereas the NOA lists a sodium limit of 105 mg/L.

The City has requested, in a letter to the RWQCB dated July 13, 2023, that the RWQCB correct this mistake in the NOA. For the purposes of this report, only TDS is evaluated, as the other constituents are not at risk for violating the new effluent limits.

This Study evaluates the currently available water and wastewater data to investigate the possibility and feasibility of source water blending and treatment options to come into compliance with the WWTP effluent permit requirements. The purpose of this Study is to summarize the results of the investigations and evaluations and develop options for compliance.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3

1.2 Approach
Carollo Engineers' (Carollo) approach to conducting the work outlined in this Study began with analyzing existing water and wastewater quality data provided by the City and by publicly available data, going back to 2012. The approach considers the possible sources of TDS into the system, including contributions from septage, industrial dischargers, and existing source waters.

1.3 Data Collection and Review
Carollo utilized data provided by the City as well as publicly available databases summarizing source water quality. The City currently samples its groundwater wells on an annual basis for TDS and hardness. It samples groundwater triennially for chloride, sulfate, sodium, and boron.

The City also provides quarterly sampling of its finished water, distributed by a Blending and Disinfection Facility. This sampling provides data for TDS constituents.

State Water Project (SWP) water quality data is provided in annual consumer confidence reports.

Wastewater sampling for relevant constituents is conducted quarterly and has historically been limited to effluent sampling. The sum of historical data was analyzed by Carollo in the preparation of this Study and used to develop the recommendations herein.

The City has also conducted monthly flow and TDS monitoring of industrial sources; the data for those sources has been provided for inclusion into this Study.

SECTION 2 WATER SUPPLY
The City draws its source water from two sources, SWP water and groundwater from the Santa Maria Valley Groundwater Basin. The average annual water supply used from each source is summarized in Table 2. The actual allocation of SWP to Santa Maria is based on determinations by the California Department of Water Resources (DWR). The average allocation to Santa Maria based on those determinations is indicated in Table 2.

Table 2 Historical Total Water Rights and Supplies Used Source 2018-2024 Average
Production Value (AFY)
Water Rights
(average allocation, AFY(1))
Water Rights
(100% allocation, AFY)
SWP Water(2) 5,587 5,792 17,312
Groundwater(3) 7,269 19,400 19,400
Average Total Supply 12,866 25,192 36,558
Notes:

AFY - acre-feet per year
(1) Average allocation from the California DWR for SWP supplies averaged 33 percent from 2021 to 2024. (2) SWP water rights are the sum of both the purchased SWP water and return flow SWP rights based on 2025 allocations. (3) Groundwater rights are the sum of both the prescriptive Groundwater rights and the Twitchell Yield rights.

As indicated in Table 2, the average water supply of SWP utilized by the City nearly matches the total allocation determined by the California DWR. This indicates that the City is utilizing nearly the full amount of SWP water that is available to them. The SWP water resources are dependent on allocations

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
determined by the state, which vary significantly depending on statewide snowpack and streamflow conditions and other factors. This means that projected future water demand is more likely to be met by groundwater supplies to ensure supply resiliency.

The percentage of the supply sources from 2018 to 2024, based on actual average production, are plotted in Figure 2.

Figure 2 City Drinking Water Source Makeup
Figure 3 represents the total supplied water utilized for consumption from 2018 to 2024. The overall water production increases significantly in the summer months, reaching highs of around 15 mgd then decreasing to around 8 mgd in the winter months. The average water production for the past six years was 11.4 mgd, but has declined slightly over time, likely due to conservation efforts.

Figure 3 Total Supplied Water

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5
SECTION 3 WATER QUALITY ANALYSIS
This section summarizes the water quality of the various water sources for TDS and salt loading at the WWTP. The primary sources are:
 Groundwater.
 SWP Water.
 Blended Water - (SWP and Groundwater).
 Industrial Dischargers.
 Septage.
 Domestic/Commercial Contributions.

3.1 Groundwater Water Quality Data
The City operates six active groundwater wells - wells 9S, 10S, 11S, 12S, 13S, and 14S. The hardness and TDS values are tracked and sampled annually in each individual well. Chloride, sodium, and sulfate are tracked triennially. Table 3 highlights the average concentration over the 12-year period between 2012 and 2024. Appendix A summarizes the compiled annual average concentrations for each constituent.

Table 3 Groundwater Wells Water Quality Data
Source Years 2012 - 2024 TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Well 9S Average 1,045 706 50 73 518
Well 10S Average 842 570 45 64 395
Well 11S Average 745 529 33 58 335
Well 12S Average 718 501 31 52 330
Well 13S Average 732 496 30 50 325
Well 14S Average 635 432 18 47 283
WWTP Limit Average 1,000 N/A 165 230 500
Notes:

CaCO3 - calcium carbonate; N/A - not applicable
Of the six wells, Well 9S is currently above the effluent permit limit of 1,000 mg/L for TDS, with an average concentration of 1,045 mg/L. Of the remaining wells, Well 10S is nearest to the limit, with an average concentration of 842 mg/L. The other wells are below this TDS limit; however, all values for TDS are above 600 mg/L. This means that the aquifer, due to natural sources and agricultural activity, contains elevated levels of TDS compared to other water sources discussed herein. Figure 4 shows the annual average concentration for each well from 2012 through 2024.

All wells have chloride, sodium, and sulfate concentrations that are well below the WWTP effluent limits, with the exception of Well 9S, which has an average sulfate concentration of 518 mg/L, which is above the limit of 500 mg/L.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6
Figure 4 TDS Concentration Trends - Groundwater Wells

3.2 State Water Project Quality Data
SWP water for the City is treated at the Polonio Pass Water Treatment Plant in Northern San Luis Obispo County prior to delivery into the Coastal Branch by the Central Coast Water Authority. At that point, water quality constituents are sampled and recorded. The data from this sampling location is summarized in Table 4 as the average concentration recorded from 2012 to 2024. For a full list of recorded annual values, consult Appendix B.

Table 4 SWP Water Quality Data
Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2012-2024 Average 306 107 86 64 70
WWTP Limit 1,000 N/A 165 230 500
All the constituents for the SWP water remain well below the permitted effluent limits.

3.3 Blended Water Quality Data
The City blends all their water supplies at the Blending and Disinfection Facility. At that facility, groundwater and SWP water are mixed, its quality is sampled, and constituents are tracked. The data

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 7
summarized in Table 5 are the values reported in the annual Consumer Confidence reports developed by the City from 2018 to 2024. The data is presented as a combined average concentration and represents the combined concentrations from SWP and groundwater sources. Appendix B summarizes the annual data for each constituent from the Blending and Disinfection Facility.

Table 5 Santa Maria Blended Water Quality Data
Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2012-2024 Average 543 332 43 54 223
WWTP Limit 1,000 N/A 165 230 500
The values observed in Table 5 reflect the average water quality that is distributed to customers in Santa Maria.

3.4 Industrial Discharge Water Quality Data
The City currently tracks TDS concentrations of eight significant industrial users (SIUs) located in its service area. SIUs are entities that discharge a minimum of 25,000 gallons per day (gpd) of process wastewater or are deemed to have a reasonable potential for adversely affecting WWTP effluent quality. The SIUs tracked by the City from 2018 to 2024 are shown below:
 Culligan.
 Fess Parker Winery.
 Fresh Venture Foods.
 Miller Family Wine Company.
 Titan Frozen Fruit.
 Sure Fresh Berry.
 Sure Fresh Produce.
 Microwave Applications Group (not sampled for TDS).
 CalSoft (Quarterly data reporting beginning in 2024. Formerly known as Rayne Water Conditioning.

TDS data available under Rayne Water Conditioning Permit prior to 2024.).

The data provided by the City tracks TDS concentrations in industrial effluent on a routine basis. Each SIU is permitted and sampled for constituents of concern, and therefore, not all permits have the same sampling frequencies and parameters. Accordingly, tracking TDS, sodium, chloride, and sulfate is permit dependent. The City maintains a discharge TDS limit (local limit) for industrial dischargers at 1,820 mg/L.

This limit has not been updated since 2004. All available TDS concentrations from each industrial discharger from 2019 to 2024 are shown in Figure 5. Individual graphs illustrating TDS concentration over time from each industrial discharger are shown in Appendix F.

The TDS loading from all industrial dischargers over the time period averaged 4,700 pounds per day (ppd), with an average flow contribution of 0.53 mgd to the sewer system.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 8
Figure 5 TDS Concentration Trends - Industrial Dischargers 0 500
1000
1500
2000
2500
January-19
March
May
July
September
November
January-20
March
May
July
September
November
January-21
March
May
July
September
November
January-22
March
May
July
September
November
January-23
March
May
July
September
November
January-24
March
May
July
September
November
Culligan Fess Parker Winery Miller Family Wine
Company
Mission Linen Supply Fresh Venture Foods
Titan Frozen Fruit Sure Fresh Berry Sure Fresh Produce CalSoft / Rayne Local Limit

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 9

3.5 Wastewater Quality Data
The City continually monitors water quality characteristics in the WWTP effluent. However, influent to the WWTP is not monitored for the salt compounds. To evaluate the progress and the trends of TDS constituents over the last five years, the annual average effluent concentrations of each permitted constituent (TDS, sodium, chloride, and sulfate) from 2018 to 2024 were compiled and are shown in Table 6. The remainder of the data can be found in Appendix C.

Table 6 TDS Concentrations at the WWTP Effluent Point
Year TDS
(mg/L)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2018-2024 Average Effluent 878 146 139 224
WWTP Limit 1,000 165 230 500

3.5.1 Septage Water Quality Data
The City accepts septage from commercial and residential sources for treatment at the WWTP. Septage quality for each individual load is not currently tracked by the City. However, the City tracks the volume and flow of septage that is deposited by users. In March 2025, as part of the Master Plan process, the City conducted water quality sampling of the septage from eight of the largest haulers over a four-week period. The following companies with significant septage contributions were sampled during this period:
 Portable Johns.
 Ingram & Greene.
 Al's Septic Service.
 Harvey's Honey Huts.
 MarBorg Industries Inc.
 Pacific Petroleum Company.
 Valley Septic Service.
 United Site Services.

The septage volumes from each contributor, as well as the percentage of each company's septage compared to overall septage flows into the plant from all sources are shown in Table 7. The total septage contribution from all flows averaged approximately 44,000 gpd from 2023 to 2024, which was

0.67 percent of the WWTP influent flow. The eight major haulers listed above contributed 57 percent of the total flow.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 10
Table 7 Santa Maria Septage Flow Contributions From Eight Major Haulers Company Daily Septage Contribution
(gpd)
Percentage of Septage Flow to the WWTP
(%)
Ingram & Greene 1,490 6%
Al's Septic Service 2,620 12%
Harvey's Honey Huts 5,352 5%
MarBorg Industries Inc. 2,202 12%
Portable Johns 5,306 3%
Pacific Petroleum Company 1,730 4%
Valley Septic Service 2,304 5%
United Site Services 4,043 9%
Total 21,004 57%
The average TDS concentrations from each source during the sampling event are summarized in Table 8.

Table 8 Santa Maria Septage TDS Concentrations
Company
Average TDS
Concentration
(mg/L)
Average Sodium
Concentration
(mg/L)
Average Chloride
Concentration
(mg/L)
Portable Johns 5,700 785 1,225
Ingram & Greene 2,100 605 1,010
Al's Septic Service 1,600 345 940
Harvey's Honey Huts 1,500 475 925
MarBorg Industries Inc. 3,900 458 930
Pacific Petroleum Company 2,600 432 520
Valley Septic Service 1,700 245 385
United Site Services 4,005 690 803
As noted in Table 8, the TDS concentrations from the selected sources are elevated and are higher than the stated-permitted levels. However, due to the relatively small flows of septage compared to overall influent to the plant, the impact of the TDS from septage sources may be limited.

The average daily TDS loading from septage is 1,033 ppd when adjusting for flow contributions of untracked sources. This represents a 2 percent contribution to the overall TDS from septage sources.

In June 2025, the City conducted further sampling in the influent sewer upstream and downstream of the septage receiving stations to quantify the effect of septage on water quality. TDS was one of the selected constituents that was monitored. Over the one-month sampling period, the average TDS concentrations of the wastewater before and after septage additions were as follows:
 WWTP pre-septage TDS concentration: 1,084 mg/L.
 WWTP post-septage TDS concentration: 1,096 mg/L.

The 12 mg/L increase in TDS concentration is equivalent to roughly a 2 percent increase in TDS loading, similar to what was observed during the earlier evaluation of the eight major septage haulers, again suggesting that the current septage haulers do not have a significant impact on the WWTP effluent TDS

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 11
concentration. As noted from the June 2025 sampling event, the TDS concentration upstream of septage dumping was already above the 1,000-mg/L limit.

SECTION 4 SALT CONTRIBUTION

4.1 Source Salt Contributions
To assess the impact of each source on the influent salt (TDS) loading to the treatment plant, TDS contributions were calculated in ppd for each source. The primary contributors to TDS loading are residential sources, septage, industrial dischargers, and source water.

The contribution from blended source water to the WWTP influent TDS is adjusted to account for the portion of water that enters the sewer system, excluding losses due to irrigation or industrial use. This sewer-to-water ratio has been estimated at 62.7 percent, based on a comparison between the water produced at the Blending and Disinfection Facility and the observed influent flow at the WWTP.

Table 9 provides a summary of TDS loading from all sources and includes a calculation of the projected TDS contribution from residential and commercial sources. For industrial contributors, any months lacking available data were excluded from the average. It is assumed that no TDS is lost during treatment within the WWTP. Residential contributions were estimated by subtracting the TDS load from known sources from the total observed WWTP loading.

Appendix D presents the projected annual TDS loading into the WWTP influent.

Table 9 Sources of TDS Loading into WWTP
Year
Observed WWTP
Effluent TDS(1)
(ppd)
Blended Source Water
Sewer TDS(2)
(ppd)
Septage
TDS(3)
(ppd)
Industrial
TDS(4)
(ppd)
Calculated Residential/
Commercial
Contribution(5)
(ppd)
2018- 2024 Average 53,000 37,000 1,050 4,700 10,250
Percent of total TDS
Contribution
- 69.7% 2% 8.9% 19.4%
Notes:
(1) WWTP effluent TDS is assumed to be the same as WWTP Influent TDS. (2) Blended sewer TDS contributions are contributions from groundwater/SWP with the applied 62.7 percent water-to-sewer factor.
(3) Septage TDS loads approximated for other years based on four-week sampling study described in section 3.5.1; rounded up to 1,050 from 1,033.
(4) Industrial TDS contributions from observed data.
(5) Taken by subtracting the Residential Loading = WWTP Effluent TDS - (Sewer Contribution + Industrial + Septage).

Table 9 shows that source water and residential contributions are the largest contributors to TDS loading at the plant. Therefore, efforts to reduce TDS concentrations below permitted limits should focus primarily on lowering TDS levels in source water and residential/commercial discharges.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 12

4.1.1 Comparison of Conservation on Wastewater Treatment Plant Influent The City's population and water use is projected to increase in the next 20 years. According to the 2020 Urban Water Management Plan, the City's water use is projected to grow from 13,244 acre-feet to 18,716 acre-feet by 2045. The City will likely see more conservation due to growth that will have to meet building codes that require water saving fixtures along with mandated water restrictions and education programs. As conservation increases, the concentration of TDS will increase.

Figure 6 compares WWTP influent flow and effluent TDS loading from 2018 to 2024.

Figure 6 WWTP TDS Loading and Flow
Figure 6 demonstrates that average influent flow has declined slightly over the last six years. In that same time period, the TDS load has increased.

In the review period, there are spikes in influent flow in the summer months, when Santa Maria sees an increase in population and agricultural activity. The harvest season in Santa Maria typically spans from June to October, which coincides with the increase in influent flow at the WWTP. However, it is expected that average influent flow will not increase at the same rate as population growth, as conservation programs in the City and state-mandated guidelines for conservation come into effect.

The City currently runs the following water conservation programs:
 Smart Landscape Rebate Program:
» Provides cost rebates and incentives to replace lawns and high-water usage plants with native and water-wise plants
» Applies to both single-family and commercial properties

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 13
 Landscape Water Restrictions:
» The City enforces restrictions on use of potable water on driveways, sidewalks, and decorative water features.
» No outdoor irrigation is permitted from 12:00 p.m. to 4:00 p.m. » Potable water is restricted for application on landscapes after periods of measurable rainfall. » Irrigating turf is prohibited at commercial, institutional, and industrial properties.  Water Awareness Month:
» An educational program that provides a focus on water conservation and highlights the importance of conservation in the City.
» The City distributes water conservation kits including low-flow showerheads, hose timers, shut-off nozzles, and moisture meter probes.
 Home Water Visits:
» The City coordinates and provides complimentary home water visits to residents. City staff inspect residential plumbing systems, meters, and irrigation systems and provide water conservation kits to homes, as needed.

The trends and the conservation programs indicate that WWTP TDS concentrations will likely increase.

4.1.2 Comparison of Source Water Salt Contributions
Table 10 summarizes the TDS loading contributions from the groundwater sources and from the SWP sources. Note that the loadings illustrated in Table 10 do not incorporate the sewer-to-water factor and reflect contributions from each source into the drinking water supply.

Table 10 Comparison of Source Water Blends for TDS
2020-2024 Average Groundwater(1) SWP(2)
Concentration (mg/L) 786 306
Flow (mgd) 7.9 3.5
Loading (ppd) 50,100 9,000
Notes:
(1) Loading calculation based on the loading of each well on an individual basis. For simplicity, the nominal averages of all well flows and concentrations are illustrated here.
(2) SWP loading rounded up from 8,970 ppd.

The groundwater TDS contributions impact the blended source water TDS much more than the SWP water TDS contributions. This indicates that reducing TDS loading in groundwater will likely have the greatest impact on final TDS concentrations at the WWTP. In other words, a smaller volume of groundwater will need to be treated to result in the same reduction in blended water TDS concentration.

4.1.3 Water Softener Regulations
The addition of TDS to the wastewater from residential and commercial use of water is not surprising, as TDS can be added through the use of detergents, cooking, washing, human waste, and water softeners.

While most anthropogenic addition of TDS cannot be controlled, the use of water softeners can be regulated.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 14
Per Table 9, residential and commercial use contribute up to 10,450 ppd of TDS or roughly 20 percent of the observed influent loading. Reducing residential and commercial contributions may have an impact on final effluent concentrations. Controlling water softener use is one way to reduce salt contributions to the sewer. The City has already adopted water softener regulations as highlighted below. Appendix E provides the specific regulatory text that regulates water softener use in Santa Maria.

1. Softeners are permitted in non-residential structures if they are:
a. Centrally regenerating canister-type units.
b. Water softeners with demand control systems.
c. Water softeners that do not discharge additional TDS or TDS in excess of the equivalent produced by demand control water softeners. In this case, they must remove 3,350 grains of hardness per pound of salt applied (3,350 grains of hardness per pound of sodium chloride).

2. For new residential construction:
a. On-site regeneration water softeners that connect to a hot-water plumbing system are permitted for new residential construction.
b. Centrally regenerated canister water softeners may be installed in hot and cold water plumbing systems for new residential construction.

Another aspect of the City's regulation states that the Director of Public Works has the authority to prohibit the installation of any new on-site regeneration water softeners. It also grants the Director of Public Works the authority to prohibit the operation or maintenance of on-site regeneration water softeners, provided there is need for it. The City's Director of Public Works has not yet issued such an ordinance.

The City's regulations mean that water softeners are not banned in the City, but their use is regulated with performance criteria. The usage of on-site regeneration water softeners is still permitted but may be rescinded by the Director of Public Works. Further, centrally regenerating canister types are permitted in all homes.

For this TDS analysis, this means that residential contributors may still contribute significantly to sewer TDS loadings at the facility. Their usage should be monitored over time and reported to the Director of Public Works as a means to limit water softeners if TDS concentrations remain persistently high in the future.

It is important to note that water softeners typically exchange calcium and magnesium ions in the feedwater with sodium ions from the resin. To maintain the ion balance, more sodium ions are released than the number of calcium and magnesium ions removed, resulting in a softer water with a slightly higher TDS. During regeneration of the softener, high-strength salt solutions (sodium chloride) are needed to convert the resin back to the sodium form. Discharging the regeneration solution to the sewer will add considerably more TDS, and this is usually the concern with household water softeners. If TDS levels continue to rise and compliance becomes a problem, the City could consider doing a study to determine if TDS is increasing due to water softeners. Given the City’s current policies, it is unlikely that water softeners are the main source of the commercial/residential TDS contributions. Additional outreach and education efforts or permitting of commercial businesses may be considered in the future.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 15

4.1.4 Industrial Discharge Regulations
SIUs in Santa Maria have a permitted local limit of 1,820 mg/L of TDS from their discharge. Figure 5 shows that some dischargers have exceeded that limit at times, but the majority remain below the stated limit.

The local limit for dischargers was previously updated in 2004.

In sum, industrial dischargers contribute roughly 4,700 ppd of TDS to the WWTP, corresponding to roughly 9 percent of the TDS loading, or an addition of about 85 mg/L to the TDS concentration based on a WWTP flow rate of 6.5 mgd.

Since the last local limit study was over 20 years ago, before water conservation began and when the combined WWTP influent TDS concentration was likely significantly lower, an update to the study is probably due. In addition, due to the potential effect of industrial discharge on WWTP TDS concentrations, the existing pretreatment guidelines established by the Environmental Protection Agency (EPA) suggest that an update to the local limits will likely be necessary as a protective measure for the WWTP effluent.

The justification for this comes from the EPA Local Limits Development Guidance document established in July 2004. In this document, the EPA notes that, if average influent loading exceeds 80 percent of the maximum allowable headworks loading (MAHL) for non-toxic pollutants (such as TDS), new local limits should be developed.

Based on the guidelines in the document, Table 11 illustrates how the City exceeds this guideline, and should reconsider their local limits for SIUs. The primary determinant for this decision is from Equation 6.1 in the Local Limits Development Guidance document (shown in Figure 7).

Figure 7 Local Limits Development Guidance - Equation 6.1

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 16
Table 11 Loading Limit Calculation
Parameter Flow
(mgd)
TDS Concentration
(mg/L)(1)
TDS Loading
(ppd)
Current Influent Loading(2) (LINFL) 7.14 894 53,300
MAHL(3) 8 1,000 66,700
Calculated Percentage (L, %) - - 80% (exceeds)
Notes:
(1) TDS concentration is based on effluent data in the absence of influent data. (2) Current influent loading (LINFL) is based on average observed flow and TDS concentrations from 2019 to 2024. (3) MAHL is based on average design flow and WWTP limit requirements.

As a result of the calculated loadings shown, the calculated percentage meets the existing EPA guidelines of 80 percent for an update to local limits. In addition, the previous update to the local limit was made in 2004, prior to water conservation and any upgrades or changes to the WWTP. As a result, it is recommended that the City pursue a sampling plan to accurately quantify influent TDS concentrations and use the updated results to potentially pursue an update in local limits for the City in parallel with the WWTP upgrades. This may mean that the TDS local limit of 1,820 mg/L standard is reduced to a lower value.

4.1.5 Septage Total Dissolved Solids
As noted in the sections above, sampling proceeded both upstream and downstream of the septage receiving points. The sampling indicated that septage contributes about 1,050 ppd or roughly 2 percent of overall TDS loading; adding about 20 mg/L of TDS at a WWTP flow rate of 6.5 mgd.

This contribution may have an impact on future compliance if overall TDS levels continue to rise. If TDS levels do continue to rise over time, the City could consider increasing septage fees or removing the septage service entirely if TDS concentrations continue their rising trends.

SECTION 5 ALTERNATIVES

5.1 Overview
As part of this Study, Carollo considered three potential options for WWTP permit compliance, focused on TDS since the other three parameters are currently within the effluent limits, and reducing TDS will reduce all three parameters, too. Options 1 and 2 are designed to control salts at their source in the City's drinking water supply. Option 3 considers salt treatment at the WWTP.

The first alternative, Option 1, evaluates different blending strategies from the existing source water supplies at the Blending and Disinfection Facility to reduce the influent salt loading into the plant.

Option 1 includes two different options for blending of existing groundwater and SWP supplies, including the installation of packers in one or more of the groundwater wells.

The second alternative, Option 2, considers the construction of a reverse osmosis (RO) treatment train at the Blending and Disinfection Facility, which will remove salts prior to distribution in the City's drinking water system.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 17
The third alternative, Option 3, evaluates the addition of an RO treatment train at the WWTP, which will remove salts prior to effluent discharge.

Centralized water softening was not selected as an alternative to reduce TDS. Although water softening is effective at reducing hardness concentrations in source waters, the softening process typically results in an increase in sodium and a slightly higher overall TDS. In addition, considering that sodium also has a permitted limit at the WWTP, centralized water softening may pose issues for future exceedances for the sodium and chloride at the WWTP.

5.1.1 Source Water Supplies
The source water supply for Santa Maria is important to understand to evaluate potential solutions for decreasing TDS concentrations. Santa Maria benefits from a multi-source water portfolio that includes groundwater extraction, purchases from the SWP, rights to Twitchell Yield, and additional pumping rights on account of return SWP flows to the basin.

Of the groundwater sources, the City operates six active groundwater wells (Wells 9S, 10S, 11S, 12S, 13S, and 14S), with a total nominal well capacity of 13,950 gallons per minute (gpm), translating to 22,503 AFY of potential pumping capacity. The capacity of each groundwater well is summarized in Table 12.

Table 12 Current Groundwater Well Capacities
Well Name Nominal Well Capacity
(AFY)
9S 2,904
10S 4,033
11S 3,468
12S 4,033
13S 4,033
14S 4,033
Total 22,503
Figure 8 illustrates the current locations of the groundwater wells. It also depicts the Blending and Disinfection Facility, which blends both the groundwater and water purchased from the SWP for final delivery to customers. In Figure 8, Wells 2, 5, 7, and 8 are inactive or abandoned.

The data and Table 9 indicate that 70 percent of TDS loading into the plant is due to the loading contributions from source water. As such, finding solutions for blending of source water TDS is likely to have the most significant impact on WWTP effluent TDS concentration. !P
!ã
TUTU
!ã
!ã
!ã
!ã !ã
!ã
!ã
!ã
!ã
!ã
Well 12
Well 13
Well 14
Donovan Pressure
Monitoring Station
Reservoir 4
Reservoir 5
Reservoir 6
Well 5
Well 7
Well 8
Well 11
Well 10 Well 9
Blending and
Disinfection Facility
State Water
Turnout
Well 6 Well 2
Bradley Rd S Bradley Rd
S College Dr
W Donovan Rd
E Donovan Rd
Blosser Rd S Blosser Rd
W Stowell Rd
E Betteravia Rd
W Main St
E Main St
N Blosser Rd
Suey Rd
S Depot St
Rosemary Rd
E Stowell Rd
Prell Rd
Foxenwood Dr
N Broadway
Woodmere Rd
El Camino St
E Alvin Ave
N College Dr
College Dr
N Railroad Ave
W McCoy Ln
Skyway Dr
W Betteravia Rd
S Broadway
Orcutt Rd
State Rte 166
E Clark Ave
Cabrillo Hwy State Rte 1
Santa Maria Way
Orcutt Expy
Black Rd
Miller St S Miller St
US Hwy 101
State Rte 135
Last Revised: August 21, 2025 [ENTER PROJECT WISE PATH NAME TO MXD] For Example:pw://Carollo/Documents/Client/CA/ClientName/10265A00/Data/GIS/Figure_01_01.aprx O
0 0.35 0.7
Miles
Disclaimer: Features shown in this
figure are for planning purposes and
represent approximate locations.

Engineering and/or survey accuracy
is not implied.

Data Sources: City of Santa Maria, ESRI

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO
Figure 8 Locations of Existing Water Production Facilities and Pipelines

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Blending and Disinfection
Facility
Donovan Pressure
Monitoring Station
!P State Water Turnout
TU Reservoir
!ã Well
!ã Inactive Well
!ã Abandoned Well
Reservoir Pipeline
State Water Turnout Line
Transmission Main
Future Well Line
Well Lines
Santa Maria City Limits

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 19

5.1.1.1 Current Operational Approach
The six groundwater wells enter the Blending and Disinfection Facility through two groundwater header lines. The first header line connects Wells 10, 12, 13, and 14 while the second connects Well 11 to the facility. Well 9 is located directly adjacent to the Blending and Disinfection Facility, where its flow is directly piped and combined onsite. There is a pipeline connecting SWP water to the Blending and Disinfection Facility, where it combines with the groundwater flows. Figure 8 highlights the locations of each well relative to the Blending and Disinfection Facility.

At the Blending and Disinfection Facility, ammonia and chlorine are added to the blended water supply, which is then distributed to customers.

There are multiple operational considerations for each water source as the City aims to achieve required water production. For SWP water, there is a fixed annual fee charged to the City by the state. The City is also required to import 10,000 AFY of SWP if it is available. As such, there is both a financial and regulatory incentive for the City to utilize as much allocated SWP water as possible.

For the groundwater wells, nitrate concentrations from each source are observed to increase over time if the well is not utilized. Accordingly, the City aims to draw from each well consistently to reduce overall nitrate concentrations in the finished blend. Utilizing each well also helps stabilize water levels and prevents excessive drawdown in any single well. The City seeks to utilize water from all its available sources consistently to ensure they will continue to operate properly.

The City is investing in ongoing capital projects to install packers that will permit the City to draw from a deeper point in the aquifer and potentially reduce the level of nitrate in the groundwater well production coming from the upper levels of the aquifer. Currently, Wells 10, 13, and 14 have had packers installed.

In addition, there are new wells that are currently in construction that will go online in 2025 and 2026.

Well 15 will connect to the groundwater header line connecting Wells 10, 12, 13, and 14, while Well 6 will connect to the groundwater header line currently connected to Well 11. Well 6 is 1,000 gpm.

In summary:
 All sources are blended at the Blending and Disinfection Facility, including:
» SWP water from the Polonio Pass Water Treatment Plant that blends through a header pipeline. » Groundwater header line 1, which connects Wells 10, 12, 13, and 14 and future Well 15. » Groundwater header line 2, which connects Well 11 and future Well 6. » Well 9, which is connected directly to the facility.
 The City has incentive to utilize all groundwater wells consistently; if left unused, the nitrate concentrations have been observed to increase.
 The City has incentive to utilize SWP water due the flat-fee incentive structure and already maximizes SWP supplies as much as possible.
 Wells 10, 13, and 14 have installed packers to withdraw more water from deeper in the basin.  Wells 6 and 15 are projected to be constructed in 2025 and 2026, respectively.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 20

5.2 Option 1: Blending
One of the primary methods the City may employ to reduce salts concentrations in the WWTP effluent is through blending of their existing source water. As noted in previous sections, source water contributes roughly 70 percent of the influent TDS loading.

This alternative considers several different scenarios that utilize different sources of groundwater and blending strategies in order to reduce TDS, sodium, and chloride concentrations in the blended water supply sent to consumers.

The blending analysis used the following assumptions:
 Average annual flows and concentrations from 2018 to 2024.  Correction factors from observed discrepancies between calculated loading and observed loadings are applied.
 62.7 percent water-to-sewer factor was applied to the finished water. This value was determined by matching the annual production from groundwater and source water sources to the WWTP influent.

5.2.1 Removal of Well 9 From Stream
Of all the groundwater production wells, Well 9S has the highest observed concentrations for TDS.

Per Table 12, it also has the smallest nominal well capacity. This means that removing Well 9 from the groundwater source supply may have the largest benefit in terms of applied loading and the smallest loss of available supply for the City.

This scenario removes Well 9 from the existing water production facilities and applies its production equally to all other wells. To provide a conservative evaluation, this scenario also assumes that future SWP water supply will decrease to a 25 percent allocation.

5.2.2 Removal of all State Water Project Water
To better understand the impact of SWP water on the TDS loading and concentrations at the WWTP, this scenario depicts the removal of all SWP water and assumes all water production is sustained by the wells.

SWP water has historically reported lower TDS concentrations than groundwater.

The replaced water production from SWP was distributed equally across each well.

5.2.3 Installation of Packers
This scenario evaluates the effect of installing packers on existing groundwater wells. As noted above, in an effort to reduce nitrate concentrations in the groundwater, the City has installed packers on Wells 10, 13, and 14. In Wells 10, 13, and 14, the packers are installed such that the wells draw from the aquifer at much lower depths.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 21
The packers, their new depths, and their installation dates are summarized in Table 13.

Table 13 Packer Installation Dates
Well Packer Construction Date New Pump Depth
Well 10S January 2021 Pump extended from 250 feet to 460 feet below the ground Well 13S October 2017 Pump extended from 280 to 430 feet below the ground Well 14S October 2010 (replaced August 2019) Pump extended from 260 feet to 440 feet  As a result of the new packers, the concentrations of all the relevant constituents decreased in Wells 10S, 13S, and 14S.
 Well 14S has consistently had the lowest concentration of TDS, sodium, chloride, sulfate, and boron.

By taking the average improvement of each constituent from the well with packers and applying it to the other wells (9, 11, and 12), the effect of installing packers on TDS loading can be approximated. To be conservative, this scenario also assumes that future SWP water supply will decrease to a 25 percent allocation.

5.2.4 Summary
The effect of each blending alternative on the projected concentrations at the WWTP are illustrated in Table 14. The observed effluent concentrations are utilized as the point of comparison against the three blending strategies.

Table 14 Effect of Blending Strategies on WWTP Effluent Concentrations Constituent Baseline Condition -
Observed Effluent
Strategy 1-
Removal of Well 9
From Stream(1)
Strategy 2 -
Remove all SWP
Water(2)
Strategy 3 -
Install Packers on
Wells 9, 11, and 12(1)
TDS (mg/L) 895 884 1,020 882
Chloride (mg/L) 149 145 136 140
Sodium (mg/L) 139 137 136 133
Notes:
(1) Strategy 1 and 3 assume a 25 percent allocation of SWP water. (2) Strategy 2 assumes 0 percent allocation of SWP water.

Table 14 indicates that the City is dependent on SWP water to remain below permitted TDS limits.

However, since the City has no control over the ultimate allocation of SWP water, the effect of strategies 1 and 3 become more important.

If the packers are installed (Strategy 3), it is projected that the concentration of each constituent will slightly decrease, relative to removing Well 9 from service (Strategy 1). Strategy 3 results in a very modest improvement in the final concentrations while minimizing the effect on total water production.

By removing Well 9, there will be a small decrease in TDS concentrations observed at the WWTP effluent point relative to the baseline condition. However, the effect on chloride, sodium, and sulfate is less pronounced compared with Strategy 3. Also, shutting down Well 9 would decrease the City's overall supply capacity by 2,904 AFY, or 13 percent of supply.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 22
The blending alternatives presented for strategies 1 and 3 assume that SWP allocations remain at 25 percent of the allowable capacity. During drought conditions or situations where the current SWP allocations decrease significantly, meeting the limits will be challenging. However, strategy 3 is currently underway and other efforts, including planned well expansions of wells 6 and 15, may allow the City to mitigate the potential effects of future drought on TDS concentrations.

Ultimately, the installation of packers is recommended as it decreases TDS concentrations while maintaining water supply volumes. However, given that water supply conditions may change, it would be important to monitor the concentrations in well 9 and compensate the flow of well 9 with the water production from newer wells 6 and 15.

5.2.4.1 Costs
The costs for the alternatives are expected to be minimal for each alternative. For strategies 1 and 2, the observed effect can be achieved by changing operational methods and by closing existing pipeline connections. For strategy 3, the installation of packers in all of the groundwater wells is currently included in existing City capital project funding. As such, no additional costs incurred by the City were considered for this alternative.

5.3 Option 2: Reverse Osmosis at Blending and Disinfection Facility This alternative consists of constructing a treatment train at the Blending and Disinfection Facility to remove TDS. The best available treatment technology to remove this constituent is RO.

Microfiltration (MF) or ultrafiltration (UF) is typically used as a pretreatment step for RO. However, in this case, an MF or UF unit may not be required at the Blending and Disinfection Facility, because drinking water contains fewer suspended solids and contaminants than wastewater, reducing the risk of membrane fouling and eliminating the need for additional pretreatment. The pretreatment needs should be evaluated further if this alternative is selected for implementation.

Based on the data, the source water accounts for 70 percent of the TDS loading at the WWTP influent.

As such, treating TDS at this stage would reduce the eventual TDS loading at the WWTP effluent.

In addition, it would reduce water hardness and likely reduce the prevalence of water softeners.

5.3.1 Reverse Osmosis Sizing Assumptions
The analysis criteria for the RO are based on the current average water production flows and TDS concentrations leaving the Blending and Disinfection Facility. The RO treatment will receive a portion of the blended source water flow and reinject low-TDS RO permeate back into the system.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 23
Table 15 summarizes the design criteria and assumed values for the drinking water RO treatment scenario.

Table 15 RO Analysis Assumptions - Blending and Disinfection Facility Criteria Value Unit Remark
RO Permeate TDS
Concentration
100 mg/L For concentration of RO effluent water, 100 mg/L is a standard value utilized in assumptions.

RO Brine Rate 10 % It is assumed that 10% of the total influent flow to the RO unit will be sent to brine disposal.

RO Permeate Recovery 90 % It is assumed that 90% of the influent flow to the RO will be treated and combined with other flows. This assumption will need to be confirmed by a detailed water quality analysis, RO projection modeling, and possibly pilot testing.

Target Effluent Goal of
Combined Flows
800 mg/L The existing WWTP Limit is 1,000 mg/L. To ensure that the treatment process keeps the effluent well below permitted limits, a 20% safety factor is applied.

Average Water
Production

11.4 mgd 11.4 mgd is the average water production from 2018 to 2024 from the Blending and Disinfection Facility.

SWP Allocation 25 % For the Drinking Water RO scenario, it is assumed that future SWP allocations will be set at 25%, and the remainder of the supply will be provided by groundwater.

5.3.2 Reverse Osmosis at Blending and Disinfection Facility The proposed process flow diagram for this alternative is shown in Figure 9.

This preliminary analysis assumes that concentrate from the RO facility will be disposed of to a local abandoned oil well that has been permitted as a Class I non-hazardous injection well for brine disposal.

This is the approach used by Laguna County Sanitation District for their brine stream. Also, it has been assumed that the RO facility will operate at a high recovery level, around 90 percent or more, to reduce the volume of brine for disposal (see Table 15). Detailed water quality analysis and RO projection modeling will be required, and possibly pilot testing, in order to confirm the RO recovery that can be achieved. For this analysis, it was assumed that the RO brine would be pumped 5 miles to the injection well location.

Figure 9 Option 2 Layout - RO at the Drinking Water Facility

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 24
The RO unit was sized based on a future 25 percent SWP allocation from the blended source water. This is a conservative basis because a lower SWP allocation increases the TDS concentrations to be treated.

Table 16 summarizes the results from the mass balance scenario. To reach an average effluent TDS concentration of 800 mg/L at the WWTP, the RO unit would need to be sized at 2.0 mgd. The RO permeate with a concentration of 100 mg/L will be blended with untreated water at the Blending and Disinfection Facility to achieve a reduction of source water TDS that will reduce the amount of TDS entering the WWTP influent.

Table 16 Required RO Sizing for Source Water
Scenario Projected RO Sizing
(mgd)
RO at the Blending and Disinfection Facility 2.0
This 800 mg/L finished water concentration would keep the City below permitted limits and provide a reliable solution for reducing TDS in the effluent. By providing RO as a treatment tool, the reliance on SWP water to remain below TDS limits would be decreased.

5.3.2.1 Costs
The planning level cost for a 2.0-mgd RO unit operating at 90 percent recovery is shown in Table 17. The RO system would include RO treatment elements, pumping and feed tanks, a new RO building, a chemical feed system, and a brine disposal pipeline. Standard markups are applied, consistent with the Master Plan.

Table 17 Blending and Disinfection Facility RO Planning Level Cost Estimate (2025 Dollars) Description Estimated Cost
Blending and Disinfection Facility Pipelines $880,000
RO Treatment Infrastructure $12,700,000
Chemicals and Chemical Storage System $1,100,000
Brine Line Disposal System (and well conversion) $8,500,000 Total Direct Cost $23,180,000
Contingency (30%) $6,954,000
General Conditions (12.5%) $3,767,000
Contractor Overhead, Profit and Markup (15%) $4,520,000 Sales Tax (8.8%) $1,326,000
Total Estimated Construction Cost $39,747,000
Engineering, Legal, Construction Management, Owners Reserve (32%) $12,719,000 Total Estimated Project Cost $52,466,000

5.3.2.2 Implementation/Advantages
The primary advantage of this alternative is its ability to reduce TDS concentrations in the effluent and reduce reliance on the SWP. By treating water at the source, the projected TDS levels at the WWTP will be reduced below permitted limits.

However, this approach has limitations. It results in a loss of 10 percent of the water fed to the RO system, or about 0.2 mgd (244 AFY). However, this is a small amount compared to the City’s groundwater source.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 25
Another consideration is that this option also addresses only the TDS contribution from source water and does not mitigate additional inputs from residential, industrial, or septage sources. Residential TDS levels may remain elevated due to the continued use of water softeners, and further conservation, even with RO treatment in place. But, on the other hand, additional trains of RO could be added in future if needed to remove additional salt. Additionally, this alternative would require the management and disposal of RO brine, which could be a significant cost and effort as indicated in Table 17. For this alternative to be successful, the RO system would need to operate at a high recovery rate. A 90 percent recovery rate was assumed for the cost estimate, and this would need to be confirmed through additional evaluations and possibly pilot testing.

5.4 Option 3: Reverse Osmosis at Wastewater Treatment Plant Effluent
This alternative consists of constructing a treatment train at the WWTP to reduce TDS. Similar to Option 2, the best available treatment technology would be RO.

The analysis criteria for the RO system is based on the projected TDS concentrations at the WWTP effluent if all the SWP contributions are stopped.

Similar to Option 2, this analysis assumes that brine produced by the RO unit would be discharged to a converted oil well for disposal. In this case, the location of the deep well would be closer to the WWTP.

To minimize brine for disposal, it was assumed that the RO process would operate at the highest recovery possible. However, this may not be as high as could be achieved for Option 2 because of other constituents in the feedwater. So, for the purpose of the analysis, a recovery of 85 percent was assumed.

This would have to be confirmed during further evaluations and/or pilot testing.

Table 18 summarizes the design criteria and assumed values for the RO installed at the WWTP.

Table 18 RO Analysis Assumptions
Criteria Value Unit Remark
RO Permeate TDS
Concentration
100 mg/L For concentration of RO effluent water, 100 mg/L is a standard value utilized in assumptions.

RO Brine Rate 15 % It is assumed that 15% of the total influent flow to the RO unit will be sent to brine disposal.

RO Permeate Recovery 85 % It is assumed that 85% of the influent flow to the RO will be treated and combined with other flows.

Target Effluent Goal of
Combined Flows
800 mg/L The existing WWTP Limit is 1,000 mg/L. To ensure that the treatment process keeps the effluent well below permitted limits, a 20% safety factor is applied.

Average Wastewater
Effluent Flow

7.5 mgd The average effluent from 2018 to 2024 was 7.2 mgd. An increase to

7.5 mgd is to provide a safety factor for the sizing of the RO unit.

Average Wastewater
TDS Concentration
1,020 mg/L Expected TDS concentration if all SWP water is removed.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 26
In this case, an MF or UF system will need to be installed as pretreatment ahead of the RO trains. The proposed flow diagram for this scenario is shown in Figure 10.

Figure 10 Option 3 Layout - RO at the WWTP
Table 19 summarizes the required size of the RO system. Treated RO permeate would be blended back into the effluent for proper disposal. Compared to Option 2, the size of the RO unit for Option 3 would be smaller because the TDS concentration in the WWTP effluent would be higher, allowing the same mass of TDS to be removed with a smaller unit.

Table 19 Required RO Sizing for WWTP Effluent
Scenario Projected RO Sizing
(mgd)
RO sizing at the WWTP effluent point 1.8

5.4.1.1 Costs
The planning level cost estimate for a 1.8-mgd RO unit is shown in Table 20. The RO system would include RO treatment elements, pumping and feed tanks, a new RO building, a chemical feed system, and a brine disposal pipeline. This alternative also includes an MF system for pretreatment. Standard markups, consistent with the Master Plan, were applied.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 27
Table 20 WWTP RO Planning Level Costs (2025 Dollars)
Description Estimated Cost
WWTP Pipelines $400,000
MF/RO Treatment Infrastructure $22,000,000
Chemicals and Chemical Storage System $1,100,000
Brine Line Disposal System $5,900,000
Total Direct Cost $29,400,000
Contingency (30%) $8,820,000
General Conditions (12.5%) $4,778,000
Contractor Overhead, Profit, and Markup (15%) $5,733,000 Sales Tax (8.8%) $1,682,000
Total Estimated Construction Cost $50,413,000
Engineering, Legal, Construction Management, Owners Reserve (32%) $16,132,000 Total Estimated Project Cost $66,545,000

5.4.1.2 Implementation
Although Option 3 would have a smaller RO system than Option 2, the overall project cost is expected to be about 20-percent more expensive because of the MF/UF pretreatment system that would be needed.

Right now, TDS reduction in the WWTP effluent is not needed. But if the option for implementation via an RO facility at the WWTP is considered as a viable option, then an area of the plant could be set aside for this purpose as part of the ongoing Master Planning effort for the planned upgrades to the treatment facilities at the WWTP.

Similar to Option 2, RO treatment of the WWTP effluent would also allow the City to reduce their dependence on SWP water and, in the case of limited SWP availability, continue to meet TDS limits.

It would also address the TDS contributions from all sources.

The disadvantages of Option 3 are, firstly, that it comes at a significant cost, which may be prohibitive.

Second, the treated effluent that is percolated back into the groundwater basin would decrease by about

0.35 mgd (360 AFY) (the amount of brine produced). Although relatively small, this reduction in effluent has a direct impact on the City's water rights, as they receive credits for recharging the groundwater basin.

Additional detailed water quality analyses would be required in addition to pilot testing, as well as a brine management study, prior to selecting this as a preferred option.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 28
SECTION 6 SUMMARY AND RECOMMENDATIONS

6.1 Summary of Findings and Recommendations for Compliance The data summarized herein indicate that TDS loading at the WWTP is primarily driven by source water (70 percent) and residential contributions (20 percent). Current concentrations at the WWTP effluent are 895 mg/L –- roughly 100 mg/L below the permitted limit, and the 25-month rolling median is currently showing a downward trend. However, during drought periods with SWP cutbacks, the City has seen TDS levels increase, and, in the future, as WWTP flows are expected to only show moderate increases despite continued population growth, TDS concentrations are likely to increase over time due to water conservation efforts.

The first alternative for compliance considers changing blending and water procurement strategies.

It evaluated removing Well 9 and installing packers on existing wells. The results indicate that removing Well 9 or high TDS wells may have a limited impact on final WWTP quality. It also suggests that installing packers on all of the wells would only have a small impact on TDS loading. The TDS concentrations are vulnerable to future reductions in SWP allocations during drought periods. However, this alternative is the lowest-cost approach and, depending on future SWP allocations and future groundwater quality, may keep the City below the newly permitted TDS limits for some time.

The second alternative for compliance shows that installing an RO unit at the Blending and Disinfection Facility to treat a portion (about 2 mgd) of the groundwater would allow the City to remain below the TDS effluent limits. This option would reduce the dependence on SWP to remain below TDS limits, and it would have the benefit of providing a better quality, lower TDS water to the City’s customers. However, this option is expensive, it would reduce the City’s water supplies slightly due to treatment losses (about

0.2 mgd associated with RO brine disposal), and would require RO brine disposal/management. This alternative additionally would not significantly address industrial or septage contributions.

The third and most expensive alternative for compliance would be providing an RO unit at the WWTP, which would allow the City to comfortably remain below targeted TDS effluent limits. It would also provide treatment and TDS removal on all sources of TDS loading at the facility. It may also provide the City the option to explore additional water reuse alternatives. However, as mentioned, this is the most expensive option, and it would reduce the City's water rights by about 0.35 mgd (about 360 AFY) due to the credit received on percolated effluent and would require expensive RO brine disposal/management.

Of the three compliance alternatives, it would be most feasible for the City to implement Option 1 in the short term. However, over the longer term, this option may not achieve the desired TDS reductions if SWP supplies are reduced and there are further impacts due to water conservation. Accordingly, the City should continue to monitor the water quality of all sources to allow time to implement one of the other options should the 25-month rolling average of WWTP effluent TDS begin to trend upwards.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 29
As a result, the following recommendations are made:

1. Considering the prohibitive cost of both RO alternatives, it is recommended that the City continue with the installation of packers on their wells, as noted above, with the understanding that monitoring of TDS concentration would be tracked closely. It is also recommended that, if TDS conditions worsen, Well 9 be removed and replaced with new Wells 6 and 15.

2. Other TDS reduction mechanisms should be considered. These include conducting public outreach and education for residential and commercial customers regarding sources of TDS discharges and use of softeners, and continuing to monitor TDS from major septage haulers to determine whether loads are increasing. If TDS rises in the future, a ban on regenerative softeners by the Public Works Director should also be considered.

3. The City should consider implementing a sampling plan and updating their industrial local limits. With the implementation of the new limits and the current levels of concentration, based on EPA guidance, the City should reevaluate their local limits. A new local limits study would require a detailed sampling plan be implemented for TDS at the influent along with all the other pollutants of concern. More stringent local limits may reduce industrial TDS contributions to the plant and help to maintain the WWTP effluent TDS below the 1,000 mg/L limit.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX A GROUNDWATER QUALITY

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-1
Table A.1 Historical Groundwater Well Concentrations
Source Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Well 9S 2012 970 670
2013 1,200 720 55 76 530 0.22
2014 1,200 720
2015 1,200 790
2016 1,200 710 56 72 530 0.25
2017 940 740
2018 970 750
2019 1,000 690 52 75 520 0.2
2020 990 750
2021 1,000 710
2022 1,000 690 38 67 490 0.18
2023 1,000 630
2024 920 610
Average 1,045 706 50 73 518 0.21
Well 10S 2012 880 650
2013 910 500 43 61 390 0.15
2014 870 510
2015 860 580
2016 1,000 680 55 71 460 0.22
2017 770 650
2018 760 590
2019 910 610 56 69 430 0.19
2020
2021 740 530
2022 780 530 27 54 300 0.15
2023 830 490
2024 790 520
Average 842 570 45 64 395 0.18
Well 11S 2012 660 530
2013 750 470 34 59 320 0.15
2014 790 510
2015 780 540
2016 790 540 34 60 350 0.2
2017 650 500
2018 640 540
2019 760 510 33 56 350 0.16

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-2
Source Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
2020 560 560
2021 790 530
2022 840 560 29 55 320 0.15
2023 850 530
2024 830 560
Average 745 529 33 58 335 0.17
Well 12S 2012 660 510
2013 700 440 25 51 290 0.12
2014 720 460
2015 780 550
2016
2017 700 560 45 56 390 0.17
2018 630 500
2019 750 520
2020 710 480 28 51 320 0.14
2021 770 550
2022 750 490
2023 720 480 26 48 320 0.15
2024 720 470
Average 718 501 31 52 330 0.15
Well 13S 2012 740 540
2013 880 550 39 55 360 < 0.1
2014 790 490
2015 740 520
2016 780 500 27 51 320 0.14
2017 830 640
2018 780 560
2019 680 470 33 46 330 0.18
2020 660 440
2021 630 420
2022 670 450 20 47 290 0.11
2023 680 440
2024 660 430
Average 732 496 30 50 325 0.14

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-3
Source Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Well 14S 2012 570 480
2013 680 430 18 49 270 0.13
2014 670 430
2015 680 430
2016 700 450 18 48 290 0.18
2017 540 440
2018 530 420
2019 660 420 21 45 290 0.14
2020 640 430
2021 640 430
2022 660 430 16 44 280 0.11
2023 660 420
2024 630 400
Average 635 432 18 47 283 0.14
Wastewater Treatment
Plant Limit
1,000 N/A 165 230 500 0.5
Notes:

CaCO3 - calcium carbonate; mg/L - milligrams per liter; N/A - not applicable; TDS - total dissolved solids

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX B SWP WATER QUALITY - POLONIO PASS

AND BLENDING AND DISINFECTION

FACILITY

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-1
Table B.1 SWP Water Quality Data
Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2012 308 101 86 62 71
2013 336 111 90 42 36
2014 428 138 120 130 120
2015 437 146 122 84 97
2016 346 115 97 87 100
2017 165 67 39 24 30
2018 220 96 81 40 55
2019 260 82 59 58 46
2020 280 97 73 56 63
2021 360 123 116 83 84
2022 380 127 104 76 96
2023 150 78 48 31 42
2024 270 88 62 57 60
Average 306 107 86 64 70
WWTP Limit 1,000 N/A 165 230 500
Notes:

CaCO3 - calcium carbonate; mg/L - milligrams per liter; N/A - not applicable; SWP - State Water Project; TDS - total dissolved solids; WWTP - wastewater treatment plant
Table B.2 Blended and Disinfection Facility Water Quality (Blend of SWP and Groundwater) Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2018 358 146 74 60 79
2019 407 236 37 43 155
2020 528 340 43 59 228
2021 600 390 50 64 265
2022 690 455 31 55 313
2023 593 375 27 48 255
2024 630 388 37 53 265
Average 543 332 43 54 223
WWTP Limit 1,000 N/A 165 230 500

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX C WASTEWATER QUALITY DATA

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN C-1
Table C.1 Annual WWTP Effluent Concentrations
Year Total Dissolved Solids
(mg/L)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2018 839 176 153 167
2019 708 160 133 134
2020 890 145 143 225
2021 987 144 148 275
2022 1055 143 140 320
2023 808 132 128 250
2024 945 125 130 218
Average 890 148 139 223
Wastewater Treatment Plant Limit 1,000 165 230 500
Notes:
mg/L - milligrams per liter

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX D SUMMARY OF LOADING INTO THE WWTP

FOR ALL CONSTITUENTS

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES D-1
Table D.1 Sources of TDS, Sodium, Chloride, and Sulfate Loading into WWTP Constituent Year
Blended Source
Water Sewer TDS(1)
(ppd)
Septage TDS(2,4)
(ppd)
Industrial
TDS(4)
(ppd)
WWTP Effluent
TDS(3)
(ppd)
TDS 2018 22,000 N/A N/A 53,000
2019 26,000 N/A 4,300 40,000
2020 33,000 N/A 4,200 54,000
2021 37,000 N/A 3,700 58,000
2022 41,000 N/A 4,400 65,000
2023 36,000 N/A 2,900 51,000
2024 38,000 1,050 3,600 52,000
Average 33,000 1,050 4,500 53,000
Chloride 2018 5,100 N/A N/A 10,800
2019 2,600 N/A N/A 9,100
2020 3,200 N/A N/A 8,900
2021 3,200 N/A N/A 8,400
2022 1,900 N/A N/A 8,800
2023 1,900 N/A N/A 8,500
2024 2,600 N/A N/A 6,800
Average 2,600 N/A N/A 8,800
Sodium 2018 3,800 N/A N/A 9,700
2019 3,200 N/A N/A 7,400
2020 3,800 N/A N/A 8,600
2021 4,400 N/A N/A 8,600
2022 3,800 N/A N/A 8,600
2023 3,200 N/A N/A 8,200
2024 3,200 N/A N/A 7,100
Average 3,300 N/A N/A 8,314
Sulfate 2018 5,100 N/A N/A 11,000
2019 9,500 N/A N/A 8,000
2020 14,500 N/A N/A 14,000
2021 16,400 N/A N/A 16,000
2022 18,900 N/A N/A 20,000
2023 15,100 N/A N/A 17,000
2024 15,700 N/A N/A 12,000
Average 14,000 N/A N/A 14,000
Notes:
ppd - pounds per day; N/A - not applicable; TDS - total dissolved solids; WWTP - wastewater treatment plant (1) Blended sewer TDS contributions are based on the applied 62.7 percent water-to-sewer factor. (2) Septage TDS loads approximated for other years based on four-week sampling study described in section 3.5.1. (3) Only WWTP effluent data reported for previous years. WWTP effluent assumed to be equivalent to WWTP influent. (4) No sodium, chloride, or sulfate data has been reported for septage or industrial sources.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX E SANTA MARIA MUNICIPAL CODE

REGARDING WATER SOFTENERS

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN E-1
The City of Santa Maria has provided restrictions on water softeners as part of an amendment to Chapter 6 of the California Plumbing Code. In the City's updates to its Municipal Code, the added amendments to the Plumbing Code of the City (Subsections 611.5 and 611.5.1) are listed in Table E.1.

Table E.1 Santa Maria Municipal Code Summary - Water Softeners City of Santa Maria
Municipal Code Regulation Application Regulatory Text
Plumbing Code (Ch 9-32.150,
subsection 611.5)
Non-Residential
Purposes
Only the following water softeners may be installed on structures utilized for non-residential purposes:
(1) Canister-type units which are centrally regenerated; or (2) Water softeners with demand control systems as defined in the City of Santa Maria Municipal Code, Section 8-12.104 (91, water softeners) & (92, demand control); or
(3) Such other water softeners, as determined by the administrative authority, which by objective testing and results will not discharge brine waste with a total dissolved solids concentration or frequency of discharge that exceeds the equivalent produced by the treatment process provided by demand control water
softeners as defined by the City of Santa Maria Municipal Code, Section 8.12.104 (91) & (92).

Plumbing Code (Ch 9-32.150,
subsection 611.5)
All Water
Softeners -
Subject to
Director of Public
Works
Determinations
Upon receipt of determinations and orders issued to the administrative authority by the Director of Public Works pursuant to the City of Santa Maria Municipal Code, Section 8-12.410, the following limitations shall apply:
(1) It shall be unlawful after the effective date of an order issued by the Director of Public Works pursuant to the City of Santa Maria Municipal Code, Section 8-12.410 (c) to install on any structure an on-site regeneration water softener as defined in Santa Maria Municipal Code, Section 8-12.104 (91); and/or
(2 It shall also be unlawful after the effective date of an order issued by the Director of Public Works pursuant to the City of Santa Maria Municipal Code Section 8-12.410 (c) to operate or maintain an on-site regeneration water softener after January 1, 2007.

Plumbing Code (Ch 9-32.150,
subsection 611.5.1)
New Residential
Construction
All users who install a water softener in new residential construction shall install plumbing so that only water feeding the hot water system is softened.

EXCEPT Canister-type units that are centrally regenerated may be connected to both cold and hot water systems in new residential construction

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN E-2
City of Santa Maria
Municipal Code Regulation Application Regulatory Text
Definitions
Plumbing Code -
Section 8-12.410 (91)
Water Softener "Water softener" means a unit using the ion exchange process designed to remove hardness (magnesium and/or calcium ions) from a water supply and requiring sodium chloride or any other salt to regenerate the exchange resin.

Plumbing Code -
Section 8-12.410 (91)
On-Site
Regeneration
Units
[Water softener] units that regenerate on location are referred to as "on-site regeneration units."
For the purpose of this section, "on location" shall mean that the unit need not be disconnected from the fixed plumbing and relocated to accommodate the regeneration process. On-site regeneration water softener shall further be described as a water softener which has been manufactured, or appropriately retrofitted with equipment to enable the unit to operate with a salt efficiency rating in compliance with a minimum rating as established by Section 4045 et seq. of the Health and Safety Code, but in no case less than three thousand, three hundred fifty (3,350) grains of hardness removed per pound of salt applied.

Plumbing Code -
Section 8-12.410 (92)
Demand Control "Demand control" means a system of controlling the periodic automatic regeneration of a water softener appliance, which is either based on a sensor which detects imminent exhaustion of the exchange bed or upon measurement of the total volume of water that has passed through the appliance since the last regeneration cycle.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX F SIGNIFICANT INDUSTRIAL DISCHARGER

TDS CONCENTRATIONS OVER TIME

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-1
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
TDS mg/L
Fess Parker Wine Concentration
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Fresh Venture Foods Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-2
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Miller Family Wine Concentration
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Mission Linen Supply Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-3
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Titan Frozen Fruit Concentration
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
Culligan Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-4
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
SureFresh Produce Concentration
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
Sure Fresh Berry Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-5
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
CalSoft/Rayne Concentration
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX L TIME SCHEDULE ORDER
Central Coast Regional Water Quality Control Board
February 5, 2026
Shad Springer, Director of Utilities
City of Santa Maria — Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:

TIME SCHEDULE ORDER R3-2026-0009
This letter transmits Time Schedule Order R3-2026-0009 for the City of Santa Maria’s (Santa Maria) wastewater treatment plant. The Time Schedule Order is effective on the date it is signed and requires Santa Maria to comply with the interim biochemical oxygen demand, total suspended solids, and total nitrogen effluent limitations presented in Time Schedule Order R3-2026-0009 no later than September 30, 2034. Santa Maria must continue to comply with General Waste Discharge Requirements Order R3- 2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day.

The Central Coast Water Board prepared and posted a Public Notice of the draft Time Schedule Order R3-2026-0009 for public consideration from December 30, 2025 through January 30, 2026. The Central Coast Regional Water Quality Control Board (Central Coast Water Board) did not receive any comments on the draft Time Schedule Order R3-2026-0009.

Please see Time Schedule Order R3-2026-0009 (attached) for detailed requirements, including, but not limited to specific tasks and due dates, and semiannual progress reports due August 1 and February 1 of each year. The first semiannual Time Schedule Order progress report is due August 1, 2026.

If you have any questions, please contact Cecile Blancarte at (805) 542-4789 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].

City of Santa Maria WWTP - 2 - February 5, 2026
Sincerely,
for Ryan E. Lodge
Executive Officer
Attachment: Time Schedule Order R3-2026-0009
cc:

Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Chrisos Stoyos, City of Santa Maria, [email protected] Michelle Yankee, City of Santa Maria, [email protected] Graham Juby, Carollo, [email protected]
Lydia Holmes, Carollo, [email protected]
Rajesh Doppalapudi, Carollo, [email protected]
Rosemary Smud, Carollo, [email protected]
Jason Johnston, Santa Barbara County, [email protected] Angela Schroeter, Central Coast Water Board, [email protected] Sophie Froelich, Central Coast Water Board, [email protected] Kelsey DeLong, Central Coast Water Board, [email protected] Todd Stanley, Central Coast Water Board, [email protected] Tamara Anderson, Central Coast Water Board, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
ECM/CIWQS = CW-255678
GeoTracker = GT-WDR100029526
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant, Time Schedule Order
R:\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\8_TSO\Final\coverletter_TSO.docx

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX M CLIMATE CHANGE ADAPTATION PLAN

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Climate Change Adaptation Plan
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Climate Change Adaptation Plan
FINAL / October 2026
Digitally signed by Lydia A. Holmes
Contact Info: Carollo Engineers Inc.

Date: 2026.10.21 15:20:50-07'00'
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.21 18:19:32-07'00'

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Climate Change Adaptation Plan/ClimateChangeAdaptationPlan.docx Contents
SECTION 1 INTRODUCTION 1

1.1 Purpose and Objectives 1

1.2 Santa Maria Wastewater Facilities 1
SECTION 2 HAZARDS AND VULNERABILITIES 3

2.1 Climate Change Hazards 3

2.1.1 Sea Level Rise 4

2.1.2 Precipitation Pattern Changes 6

2.1.3 Temperature Fluctuations and Extremes 12

2.1.4 Increased Wildfires 15

2.1.5 Increased Power Outages 17

2.1.6 Summary of Climate Change Hazards 18

2.2 Vulnerability Assessment 19

2.2.1 Methodology for Assessing Vulnerability 19

2.2.2 Vulnerability Assessment Results 21

2.2.3 Vulnerability Assessment Summary 24
SECTION 3 RESILIENCY ACTIONS 25
SECTION 4 ADAPTATION STRATEGY 26

4.1 Prioritization of Resiliency Actions 27

4.2 Schedule and Milestones for Selected Actions 28

4.3 Financial Planning 29
SECTION 5 RECYCLED WATER FEASIBILITY PLAN 30
Tables
Table 1 Summary of Temperature Extremes for Santa Maria 15 Table 2 KBDI Values and Corresponding Wildfire Risk Levels 17 Table 3 Summary of Climate Change Hazards in Santa Maria 18 Table 4 Sensitivity Rating Scale 20
Table 5 Adaptive Capacity Rating Scale 20
Table 6 Vulnerability Scoring 20
Table 7 Vulnerability Rating Scale 20
Table 8 Vulnerability Assessment - Sea Level Rise 21
Table 9 Vulnerability Assessment - Precipitation Pattern Changes 22 Table 10 Vulnerability Assessment - Drought 22
Table 11 Vulnerability Assessment - Flooding 23
Table 12 Vulnerability Assessment - Extreme Temperatures 23 Table 13 Vulnerability Assessment - Increased Wildfires 24 Table 14 Vulnerability Assessment - Increased Power Outages 24

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 15 Vulnerability Assessment - Summary 24
Table 16 Resiliency Actions for the Santa Maria Wastewater System 26 Table 17 Prioritization of Resiliency Actions 27
Table 18 Schedules and Milestones of Resiliency Actions 28 Table 19 Resiliency Actions and Funding Strategy 29
Figures
Figure 1 Santa Maria WWTP 2
Figure 2 Santa Maria Collection System and Lift Station 2 Figure 3 Hourly Sea Level Projections for Port San Luis (RCP 8.5) 5 Figure 4 Projected Sea Level Rise Extents for 2100 6
Figure 5 Santa Barbara County Historical Percent-of-Normal Water Year Rainfall 7 Figure 6 Annual Average Precipitation (RCP 8.5) Historical and Projected for Santa Maria, California 8
Figure 7 Estimated Intensity of Extreme Precipitation Events (RCP 8.5) Historical and Projected for Santa Maria, California 9
Figure 8 Historical Drought Conditions in California 10 Figure 9 California Drought Monitor Map (February 2025) 10 Figure 10 Maximum Length of Dry Spells (RCP 8.5) 11
Figure 11 100-Year Flood Zones in the City's Service Area 12 Figure 12 Annual Average Maximum Temperature (RCP 8.5) 13 Figure 13 Annual Average Minimum Temperature (RCP 8.5) 13 Figure 14 Number of Extreme Heat Days (RCP 8.5) 14
Figure 15 Number of Warm Nights (RCP 8.5) 14
Figure 16 City of Santa Maria Fire Hazard Zones 16
Figure 17 Number of Days with KBDI > 600 (RCP 8.5) 17

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AR6 Sixth Assessment Report
BRIC Building Resilient Infrastructure and Communities
CCAP Climate Change Adaptation Plan
CIP Capital Improvement Program
City City of Santa Maria
CWSRF Clean Water State Revolving Fund
degrees F degrees Fahrenheit
FEMA Federal Emergency Management Agency
GCM global circulation models
I&I inflow and infiltration
IPCC Intergovernmental Panel on Climate Change
KBDI Keetch-Byram Drought Index
MRP Monitoring and Reporting Program
PPA Power Purchase Agreement
PPP Public-Private Partnerships
RCP Representative Concentration Pathway
SRF State Revolving Fund
WWTP wastewater treatment plant

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
SECTION 1 INTRODUCTION
Global temperatures have risen over the last century, a trend that is predicted to continue. The increase in temperature creates changes to weather patterns, which can lead to sea level rise, environmental hazards, and extreme hydrological events.

As required by their General Order Waste Discharge Permit and Monitoring and Reporting Program (MRP), the City of Santa Maria (City) has developed a Climate Change Adaptation Plan (CCAP) as a guide in the assessment and identification of climate vulnerabilities and development of an adaptation strategy to complete resiliency actions for its wastewater system.

1.1 Purpose and Objectives
This CCAP is intended to identify climate change hazards, assess the City's wastewater systems' vulnerability to the identified hazard, and provide resiliency actions and adaptation strategies to mitigate consequences associated with climate change hazards.

The key objectives of the CCAP are to:
 Identify climate change hazards to the City's wastewater systems.  Assess the wastewater systems vulnerability to identified hazards that could cause reduction, loss, or failure of treatment processes and/or critical structures at the wastewater system.  Identify actions to build wastewater systems and operational resilience to identified vulnerabilities.  Develop and implement an adaptation strategy to complete resiliency actions.  Develop a Recycled Water Feasibility Plan that will assess the viability of using the wastewater system's treated effluent for beneficial reuse.

This report has been configured to comply with the requirements as set out in the MRP No. R3-2023-0032.

1.2 Santa Maria Wastewater Facilities
The City's wastewater facilities include the Santa Maria Wastewater Treatment Plant (WWTP), which consists of a secondary treatment plant and 123 acres of percolation ponds located at 601 South Black Road in the City of Santa Maria. In addition, there is one lift station located in the southern area of the City's 20-square-mile service area and a sewer collection system that includes 250 miles of pipe that conveys wastewater to the WWTP, mostly by gravity.

The Santa Maria WWTP site currently occupies approximately 211 acres and is generally bounded by Route 166 to the north, Ray Road on the west, and Black Road to the east. The WWTP site elevation is approximately 150 feet above mean sea level. Figure 1 shows a portion of the Santa Maria WWTP site, which includes secondary treatment facilities, process buildings, sludge drying beds, and percolation ponds.

The City's collection system, as well as the one wastewater lift station, is shown in Figure 2.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
Figure 1 Santa Maria WWTP
Figure 2 Santa Maria Collection System and Lift Station

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3
SECTION 2 HAZARDS AND VULNERABILITIES
Globally, the average temperature has increased about 1.7 degrees Fahrenheit (degrees F) since 1970. This warming of our planet has caused a shift in weather patterns, generating climate hazards, which create vulnerabilities for wastewater facilities. In this section, current climate change hazards related to the City's wastewater facilities are identified, and a vulnerability assessment for each of these hazards is performed.

2.1 Climate Change Hazards
The five major climate change hazards or events that are to be evaluated and that may impact the City's wastewater system are as follows:
 Sea Level Rise.
 Precipitation Pattern Changes.
 Temperature Fluctuations and Extremes.
 Wildfires.
 Power Outages.

For each of these climate hazards, impacts were evaluated for mid-century (2035-2064) and end-century (2070-2099) and compared to baseline modeled history (1961-1990). The climate change predictions for each of the identified hazards were compiled from a review of the following recent data, literature, and research:
 Cal-Adapt 2021:
» Climate data on Cal-Adapt includes maximum temperature, minimum temperature, precipitation, sea-level rise, and wildfire. The effects of climate change in the City's service area were projected using conditions defined in the Representative Concentration Pathway (RCP) 8.5 scenarios, as developed by the Intergovernmental Panel on Climate Change (IPCC). IPCC uses RCPs to describe the different degrees of climate change. RCP 8.5 assumes a business-as-usual scenario with no reduction in greenhouse gases and is the chosen basis for City-wide climate change adaptation related analyses.
 Fifth National Climate Assessment:
» This comprehensive federal report assesses climate change impacts, risks, and adaptation responses across the United States. The report provides long-term climate projections relevant to the City and informs risk assessment for extreme temperatures, drought, and flooding based on national trends. The report also supports decision making for infrastructure resilience by highlighting best practices from across the county.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
 California's Fourth Climate Change Assessment - Central Coast Region Report:
» This report focuses on climate change impacts specific to the Central Coast region, including Santa Barbara and San Luis Obispo counties. It includes localized temperature projections, such as rising temperatures, changing precipitation patterns, and increased wildfire risk.  Climate-Safe Infrastructure Working Group Report:
» This report offers engineering and planning guidance for infrastructure resilience to climate change, focusing on designing and upgrading critical infrastructure to withstand future conditions.

In the following section, each of the identified climate change hazards is evaluated as they pertain to the City's service area.

2.1.1 Sea Level Rise
Earth's climate is changing, ice sheets and glaciers are melting, ocean water is warming and expanding, and sea levels are rising in response. As sea level rise continues, risks from other coastal processes are expected to increase. For example, rising sea levels will lead to more episodic flooding and permanent inundation of low-lying areas that are exposed to high tides, and erode important habitats such as beaches, coastal wetlands, cliffs, and dunes. Higher sea levels will also contribute to rising groundwater tables that will bring saltwater intrusion into freshwater aquifers, increase corrosion of underground infrastructure, mobilize subsurface contaminants, and lead to surface pooling of water (Ocean Protection Council).

There are five sea level scenarios for California derived from the sets of probabilistic projections developed in the IPCC Sixth Assessment Report (AR6) and reflect the most up-to-date scientific understanding of the physical drivers of sea level rise. For the purpose of this analysis on the effects of sea level rise in the City's service area, a High sea level scenario was assumed, corresponding to 6.6 feet of global mean sea level rise by 2100. This scenario only arises with high future emissions and high warming, with large potential contributions from rapid ice sheet loss processes, and is the most conservative estimate scenario for global sea level rise.

To gauge the effect of sea level rise on the City's wastewater service area, future sea level rise scenarios for the Port San Luis National Oceanic and Atmospheric Administration tide gauge were evaluated that included local estimates of vertical land motion produced by the IPCC AR6. From this data, it is estimated that sea levels will rise by 1.1 feet by 2050 and 6.3 feet by 2100 using the High sea level scenario. Figure 3 shows the projected fraction of year that sea level would be over 5.2 feet under the 50th percentile, 95th percentile, and 99.9th percentile Sea Level Rise scenarios (California Ocean Protection Council (Rising Seas)) for the tide gauge station at Port San Luis under the RCP 8.5 scenario (Source: Cal-Adapt).

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5
Figure 3 Hourly Sea Level Projections for Port San Luis (RCP 8.5) Although sea levels are predicted to rise at the closest tide gauge station to the City's service area, the projected extent of sea level rise effects, even under the worst-possible scenario, is not predicted to impact the City directly due to the inland location and elevation above sea level of the City's service area.

Figure 4 shows the extent of projected levels of sea water rise for 2100 in relation to the location of Santa Maria, noted with a star.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6
Figure 4 Projected Sea Level Rise Extents for 2100

2.1.2 Precipitation Pattern Changes
California's climate has historically varied between wet and dry years, as shown in the Percent of Normal Rainfall graph (Figure 5), which depicts the current extensive variability of annual rainfall within Santa Barbara County. These patterns that already happen cyclically will become more extreme under climate change.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 7
Figure 5 Santa Barbara County Historical Percent-of-Normal Water Year Rainfall Figure 6 shows Cal-Adapt projections for present, mid-century, and end-century average annual precipitation for the City's service area for the RCP 8.5 scenario. While the average annual precipitation for the City is not expected to change significantly by the end of the century, precipitation will likely be delivered in more intense storms and within a shorter wet season.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 8
Figure 6 Annual Average Precipitation (RCP 8.5) Historical and Projected for Santa Maria, California Projections show that the wettest day of the year will become wetter relative to historical conditions, with research suggesting that wet years will become wetter, and dry years will become drier. Figure 7 shows the estimated intensity (Return Level) of Extreme Precipitation events, which are exceeded on average once every five years (Return Period) and how these conditions are expected to change in a warming climate over historical, mid-century, and late-century time periods from Cal-Adapt. Extreme precipitation events are days during a water year (October-September) with two-day rainfall totals above an extreme threshold of 0.97 inch.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 9
Figure 7 Estimated Intensity of Extreme Precipitation Events (RCP 8.5) Historical and Projected for Santa Maria, California

2.1.2.1 Drought
Droughts are a natural part of the climate cycle; but as earth's atmosphere continues to warm due to climate change, droughts in California are becoming more frequent, severe, and pervasive. Figure 8 illustrates historical drought conditions in California, with the most extreme drought occurring from 2012 to 2016. Currently, most of California, including Santa Barbara County, are experiencing drought conditions as shown in Figure 9, which are expected to persist throughout the next year.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 10
Figure 8 Historical Drought Conditions in California
Figure 9 California Drought Monitor Map (February 2025)

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 11
Droughts are often characterized by prolonged periods of below-average precipitation and above-average temperatures, resulting in prolonged periods of dry spells and water deficits. Historically, the average length of a dry spell in Santa Maria is 147 days. Cal-Adapt climate projections for Santa Maria show a slight increase in the maximum length of dry spells for each year, or the maximum number of consecutive days with precipitation less than 1 millimeter for each year, averaging 159 days by end-century, as shown in Figure 10.

Figure 10 Maximum Length of Dry Spells (RCP 8.5)
The projected increasing frequency and intensity of droughts in California will ultimately lead to water use restrictions, which can result in higher concentrations of sewage entering wastewater systems. However, even though drought frequency and intensity are expected to increase in California, the City is only projected to see an increase of 12 days in the length of a dry spell by end-century compared to the historical average.

2.1.2.2 Flooding
Severe drought, in combination with projected increases in the intensity of the rain events that do occur, can lead to increased runoff when it rains, resulting in more extreme flooding. Climate projections predict that more precipitation will be falling in fewer, more-intense storm events. This means that the stormwater systems will take in larger amounts of water for a single storm event, which increases the potential for flooding to occur. Figure 11 shows the flood zones located within the City's service area, which are subject to inundation by the 1 percent annual chance flood event.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 12
Figure 11 100-Year Flood Zones in the City's Service Area The yellow star on Figure 11 shows the location of the Santa Maria WWTP, which is far from 100-year flood zones. Therefore, the Santa Maria WWTP has a relatively low risk of flooding even with increased intensity of rain events.

2.1.3 Temperature Fluctuations and Extremes
The City is susceptible to the same weather patterns as other parts of Central and Southern California, and, while most of the time the climate is mild, temperature extremes can and do occur. As planetary warming continues, the severity of weather extremes is predicted to increase. According to the Cal-Adapt climate projections, the annual average maximum and minimum temperatures for Santa Maria are expected to increase into the end of the century as climate change progresses. Figures 12 and 13 show annual average maximum and annual average minimum temperatures, respectively, at present, mid-century, and end-century time periods.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 13
Figure 12 Annual Average Maximum Temperature (RCP 8.5)
Figure 13 Annual Average Minimum Temperature (RCP 8.5)
Cal-Adapt also projects an increase in the number of extreme heat days, which are the number of days that exceed the 98th percentile of historical maximum temperatures, 90.9 degrees F, between April 1 and October 31 based on observed daily temperature data from 1961-1990. As shown in Figure 14, the number of extreme heat days per year in Santa Maria is expected to increase throughout the mid- and end-century.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 14
Figure 14 Number of Extreme Heat Days (RCP 8.5)
Additionally, extreme heat days and warm nights have become more frequent since 1950. Cal-Adapt projects an increase in the number of warm nights through the end of the century, which are the number of days in a year when the daily minimum temperature is above a threshold temperature of

58.7 degrees F. As shown in Figure 15, Santa Maria is expected to see an increase in the number of warm nights per year by the end of century.

Figure 15 Number of Warm Nights (RCP 8.5)
Although the City is expected to see an increase in temperatures as global warming continues, even under the worst-possible scenario, the impact on the City's wastewater service area is minimal. Even with the projected increase in temperatures for the City's service area, temperatures will not pose a threat to

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 15
wastewater facilities and their operation. Table 1 summarizes the projected temperature extremes for the City's service area based on the information presented in Figures 12 through 15.

Table 1 Summary of Temperature Extremes for Santa Maria Temperature Extreme Baseline
(1961-1990)(1)
Mid-Century
(2035-2064)(1)
End-Century
(2070-2099)(1)
Average Annual Maximum Temperature 69.4 degrees F 73.5 degrees F 76.5 degrees F Average Annual Minimum Temperature 46.2 degrees F 50.3 degrees F 53.3 degrees F Number of Extreme Heat Days 2 days 5 days 12 days
Number of Warm Nights 8 nights 39 nights 80 nights
Notes:
(1) Represents the average of the most likely outcome over a 30-year period based on RCP 8.5 scenario.

2.1.4 Increased Wildfires
The City of Santa Maria has several areas within mapped Fire Hazard Severity Zones and Wildland-Urban Interface areas. Figure 16 shows the fire hazard map from Cal-Fire for the City, illustrating the level of wildfire threat throughout the City's service area. In general, Figure 16 shows the City's wastewater service area is in a low-risk fire hazard area due to its location in the valley. However, the hills surrounding the valley, shown in red in the Figure, have a higher risk of wildfire. The star in Figure 16 is the location of the WWTP.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 16
Figure 16 City of Santa Maria Fire Hazard Zones
A changing environment means higher temperatures and a drier atmosphere, creating conditions that are prime for wildfires to spread. The frequency, severity, and impacts of wildfire are sensitive to climate change as well as many other factors, including development patterns, temperature increases, wind patterns, and precipitation change. Therefore, it is more difficult to project exactly where and how fires will burn. Instead, climate models estimate an increased risk for wildfires.